THIRTEENTH REPORT
of the
STATE HIGHWAY BOARD OF GEORGIA
to the
GOVERNOR AND GENERAL
ASSEMBLY
,,
of the
STATE OF GEORGIA
130(}--10028
for the
FISCAL YEAR ENDING JUNE 30, 1931
aTEIN PftiNTINQ CO., ATLANTA, .....
THIRTEENTH REPORT
of the
STATE HIGHWAY BOARD OF GEORGIA
to the
GOVERNOR AND GENERAL ASSEMBLY
of the
STATE OF GEORGIA
fnr the
FISCAL YEAR ENDING JUNE 3o, 1931
Headquarters Building, State Highway Board of Ga. , 2 Capitol Square, Atlanta.
CONTENTS
Part One.-Introductory Part Two.-Accounting Part Three.-Construction Part Four.-Maintenance Part Five.-Miscellaneous Activities and
Information
State Route No. 9-11, Union County- Resurfacing
PART ONE INTRODUCTORY
LOOKING BACKWARD
(Copied from the first report of the State Highway Department
of Georgia, dated June 15, 1919.)
"WHO AMI?"
The foot that pattered in primeval slime gave me birth.
Unchanged while the ages pass, I have endured. Time has but served to increase my infinite variety. Earth-born and without a soul, yet I have lived. From the beginning have I been man's enemy.
A dust-colored python am I, stretching my length across hills, awaiting my time to crush endeavor.
I have snared caravans that left bleaching bones in land now desert.
Empires have fallen because of me.
I have turned victories into routs; I have trapped mighty leaders and have crushed enemies.
I am without faith; and those who trust me, I deceive.
Today I am fair to look upon; tomorrow a steaming bog.
I add difficulty to distance.
With isolation do I conspire to unjoint the endeavors of man. I tug at the wheels of the gristing cart, that bread may be dear. I hamper those that would feed the race.
I am an enemy of church and school. I mire the healer on his rounds and delay the coming that little ones may die.
I am a disrupter of the home. I speed the first born to the cities when I am fair to see; and when he would return I face him with my hidden depths. I minister to bitterness and lay a tax on all the world. 'rhere is none who lives who does not pay me tribute.
When man plowed with a crooked stick I was there.
When the ancients covered me with stones I slipped away to other lands. I am the oldest line that lives today. Men count me cheap. I know the price they pay who count me so.
I am the unimproved highway.
My name is Mud.
6
FOREWORD There have been no changes in the personnel of the Board or Officials of the Department during the Fiscal Year 1930-1931. Owing to the increased revenue derived from four cents gas tax, (in effect since September 1929), there has been an appreciable gain in mileage constructed and under construction during the period noted above. The tables following will give the details of the work performed.
Further, more funds have been available for Maintenance and Equipment than in previous years and the result is shown in the improved condition of Maintenance in all branches.
During the period of this report, with the approval of Gov. Hardman, the Board bought a lot and erected a suitable headquarters building, financed from the funds of the Board. This building has been occupied by the General Office since March 1931 and can be enlarged by the addition of two more stories when necessary. The building is located opposite the Capitol grounds and adds much to the convenience and expedition of Departmental activities.
7
A SHORT HISTORY OF HIGHWAY
DEVELOPMENT IN GEORGIA.
TO
Fiscal Year Ending June 30, 1931.
In 1755, while Georgia was yet a British Colony, she passed her first road law. This law divided the Colony into nine road districts. Each district had six surveyors who were required to locate, construct and maintain the highways within their districts. To provide labor for the work the law required each male citizen between the ages of 16 and 60 to give twelve days' labor each year to road work. The surveyors had authority to call the men to work at such time and place as they might require. They could accept money in lieu of labor to be applied to road work by employing substitutes to work in place of those preferring this method rather than do the actual labor required. Some fairly good work was done under this method prior to 1785.
After the Revolutionary War the State Legislatures passed several laws governing the construction and improvement of the State roads. Among these laws was the old Statutory Method used in England prior to the settlement of Georgia in 1733. Under this law the counties were divided into road districts, each district having its supervisors who were authorized to call each male citizen of road age, (16 to 60), to work on the roads of his district from five to fifteen days during each year.
New roads were located by agreement between the supervisors and residents of the district. 1'he location and construction was accomplished by caiJing on all the men of the district to meet at a designated place, with the necessary tools and equipment to locate, clear and grub and grade the road. In most cases the men were told what tools to bring. This designation was usually made after finding out what tools and equipment the man had. Some brought picks, some shovels, some axes, while others brought mules, plows, wagons and carts. These meetings generally resulted in three or four days frolic with very little road work accomplished. This method was continued, however, for nearly fifty years.
In 1829 the people seemed to realize the State was not progressing and it was attributed largely to lack of transportation facilities due principally to lack of adequate highways. The legislature of that year was prevailed upon to appropriate $70,000.00 to be used to purchase labor for road construction. Under this plan there was some improvement. The amount of
8
money, however, was too small to satisfy all the counties, most of it being spent near the well populated centers, and the poorer counties, needing roads badly, were left out. This condition soon brought about a repeal of this law. While the law was inadequate, its repeal was disastrous, as no substitute was offered
Realizing the State could not progress without roads several far sighted business men organized contracting firms, who obtained charters from the State to build turn-pike or toll roads. This method accomplished a great deal in road building, and it has been less than a half century since the method was discontinued. The old Statutory or English method was not discontinued in some of the counties until recent years.
The method of turn-pike or toll road construction by a well organized company, equipped to do the work, was peculiarly fitted to the needs of the North Georgia section of the State, as road construction in that section was expensive. Some of the toll roads constructed over the Blue Ridge Mountains were not abandoned until the State and County, with the aid of the Federal Government, had constructed roads across the mountains to take their places.
After the War Between the States was over, and everything in chaos and confusion in the South, the Georgia Legislature declined to renew the charters of the road building companies and the counties were forced to go back to the old Statutory Method, the first method applied to road building in the State. This resulted in many miles of poorly located, poorly constructed and very poorly maintained roads. This condition continued for twenty-five years.
In 1891 the State Legislature authorized the County Commissioners, with the approval of the grand jury, to levy a road tax of two mills on each dollar of assessed property, real and personal, and to collect a commutation tax of fifty cents from each male inhabitant, subject to road duty. This provided funds with which to buy teams and equipment and to employ labor to be used continuously on road work. The improvement in road conditions in most of the counties was very marked almost immediately. To begin with most of the roads were poorly located, and the means provided from the road tax and commutation tax, above referred to, was not sufficient to rebuild the roads, and the improvement, in most cases, was made along the old roads which had been laid out without the aid of a competent engineer.
In 1908 the system of leasing its convicts to contractors, farmers, mill owners and others was abolished by legislative Act, and all able bodied convicts of the State were turned over to the counties for road construction on a basis of Post road mileage in
9
the county. Practically every county in the State took advantage of this Act and went to work immediately to arrange for housing and caring for these convicts. It gave assurance of good labor forces at all times, the cost of which could be taken care of by the two mill property tax and the fifty cents per head commutation tax. With the exception of the $70,000.00 appropriated in 1829, the Act giving the counties the use of State convicts for road building was the only aid the State had rendered the counties for road construction up to the time this Act was passed in 1908. The State Constitution does not provide funds for the State to spend on internal improvements. This was left to the Counties.
With the use of convict labor to be cared for with the commutation tax and road tax the counties were able to purchase additional equipment for road construction and many of the counties employed competent engineers to relocate and reconstruct the main county highways. A great improvement was made over the old methods.
In 1908 there were a number of automobiles in Georgia. The number began increasing at such a rate the question of taxing the owner for funds to repair the roads he was tearing up was quite freely agitated throughout the State. The question was brought before the legislature of 1910 and an Act was passed authorizing the Secretary of State to furnish a license plate to attach to the car and charge a fee therefor based on the kind and horse power of the car. The fees so collected to be set up as a "State Road Fund" to be apportioned to the counties on a basis of Post road mileage in the county. This gave the counties additional funds for road building, and many of them did some excellent work.
When the Federal Aid Law was passed by Congress, July 11, 1916, for the purpose of "Aiding the States in the construction of rural post roads" it was obligatory on the States to arrange for the acceptance of this aid by creating a Highway Commission to receive and disburse the Federal Aid funds. This fund, of course, to be applied to such road construction as was approved by the duly authorized agencies created by the Act itself. Georgia realizing the importance of this measure took steps immediately to create a State Highway Commission. The Act was passed August 16, 1916. The first Highway Commission was composed of the State Prison Commission of three men, the State Geologist, the Dean of the College of Civil Engineering of the State University, and the Professor of Highway Engineering at the Georgia School of Technology. The Commission employed a State Highway Engineer who was also made Secretary and Treasurer. He was authorized to employ assistant engineers and draughtsmen for the proper conduct of his office.
10
Georgia has about 98,000 miles of roads that come under the head of "rural post roads." The Federal Aid law limited the the Federal Aid System to 7% of the total State mileage and required the States to submit a key map showing the roads to be included in a State System, not to exceed 7% of the total State mileage, on which Federal Aid would be asked. The first, or key map, prepared by the Highway Commission contained 4,800 miles on which the State desired Federal Aid. This map covered a system of county seat to county seat roads, and is pretty well adhered to still by the Federal Government. The State Highway Board, however, has increased the State System to 7, 100 miles or over.
When the Highway Commission was created it was only a medium through which to collect Federal Aid, and having no funds with which to match Federal Aid the Commission was compelled to call on the counties. The counties had to take care of the engineering expense as well. This led to the employment of Project Engineers who were paid by the counties on a percentage of the cost of the project. It goes without saying, the work was done in short projects in the counties best able to match Federal Aid.
As the allotment of Federal Aid was small it was soon taken up by the larger and wealthier counties, this resulted in the State having a great many finished projects in widely separated districts, with very little chance to connect them into a finished through road, as the intermediate counties were not able to put up the money to match Federal Aid, and the State had no funds to apply to this work. Hence the expression "crazy-quilt patchwork road system."
In 1918 the Georgia Legislature appropriated $10,000.00 for the support of the Highway Commission for that year. Most of this fund had to go to pay salaries and expenses then in arrears. The same legislature also appropriated $15,000.00 from the motor vehicle fund for the Commission to apply to salaries and expenses of the employees, including the State Highway Engineer and his Assistants. This sum was small, but made the Commission a little more independent of the counties for its support. It did not, however, relieve them of the necessity of calling on the counties to match Federal Aid and pay project engineers for their services.
The legislature of 1919 passed its first real highway law. This Act completely reorganized the State Highway Department by creating a Commission of three men, one to represent the northern section of the State, above a certain parallel of latitude, another from the southern section of the State below a certain parallel
11
of latitude and the third man to be a resident of that section of the State between these two latitudes. The members of the Board were to serve two, four and six years. The terms thereafter to be for six years, each commissioner to serve as chairman for the last two years of his term.
The Act created a State Aid System of 4,800 miles and set aside the entire fund collected from the sale of motor vehicle tags for the use of the Commission. This gave the Commission some real money with which to organize an efficient engineering force to take care of the work in the twelve congressional districts. Each of the twelve districts had a force of engineers installed in comfortable offices, with all the necessary engineering and office
equipment, besides motor cars and trucks to begin work on Janu-
ary 1, 1920.
The Commission went to work at once to discontinue the use of project engineers by taking over the work being done by them and paying their fees up to the day of transfer to its own engineering forces. Many of the project engineers were taken into the Highway Organization, and the engineering department moved off in good shape at once.
In 1921 the legislature increased the State Aid System to 5,500 miles and limited the expenditures for the support of the department to six per cent of the gross expenditures. This support, of course, came from the motor vehicle fund. The balance of this fund could be used for construction and other purposes.
This same legislature enacted the first gas tax bill. The Act provided for the collection of one cent per gallon on all gasoline purchased in the State for use in automobiles, trucks and tractors. The fund went into the State Treasury to be used for five years in discharging obligations of the State which were past due. None of it went into road construction.
In 1922 an Act was passed compelling the Highway Department to take over the State System, which had been placed at 5,500 miles, for maintenance. This Act took the entire income from license fees for overhead expense and maintenance and left nothing for the State to use for construction.
The legislature of 1923 passed an Act authorizing the collection of three cents per gallon on gasoline sold in the State, one cent of which went to the Treasury to carry out the obligation created by the Act of 1921, one cent to go to the counties to be used on public roads, the other cent to go to the State for State road work. While this was small it gave the State its first construction fund.
In 1925 the legislature authorized the collection of an additional half cent per gallon on gasoline which went to the High-
12
way Department for road building. This legislature added 800 miles to the State System, giving a total of 6,300 miles.
In January 1927 the old obligation created in 1921 had been discharged and the one cent per gallon of gas sold in the State formerly used for this purpose was given to the Highway Department. This gave the Department two and a half cents from each gallon of gasoline and created a fairly nice amount for road building.
The legislature of July 1927 authorized the collection of four cents per gallon on gasoline sold in the State. One cent per gallon to continue to the counties. A half cent per gallon to go to public schools for equalization of that fund. This left the Highway Department with two and a half cents from each gallon of gasoline for construction purposes. From this fund the Highway Department collected $5,151,315.65 for the year ending December 31, 1928.
During the 1929 Session of the Legislature an Act was passed raising the Gasoline Tax from four to six cents per gallon to be distributed as follows: Four cents per gallon to the State Highway Boird for Construction of Roads and Bridges; One cent per gallon to the different counties to be used exclusively on roads and bridges as provided for in the Acts of 1923 and 1925; One cent per gallon to be allotted to the Public Schools as an equalization fund.
This Act (distributing four cents to the Highway Fund) went into effect September 1st, 1929 and it gave immediate impulse
to construction. The receipts from the gasoline tax 1929 (2 72' for
8 months, 4 for 4 months) netted $6,260,000.00. For the calendar year 1930 the Gasoline Tax ran a little over $9,000,000.00.
The present receipts of the Board are derived from the Motor Vehicle License Fees, Gasoline Tax, Federal Aid and a few miscellaneous items. County participation has practically ceased. However, all county participation is an obligation of the Board. The law has been that the Counties are to be repaid after the completion of the State system. The 1931 Legislature changed the law, and instructed the Highway Board to begin to reimburse the Counties in 1936. In addition, the Highway Board was instructed to pay for a State Farm to be selected, also, to advance funds on sale of W. & A. R. R. rentals.
It will be noted from the foregoing that from a beginning that had barely enough funds appropriated to maintain the Commission appointed, the Highway Department has been and is enabled to construct and maintain roads from sources of revenue enacted by the Legislature from time to time.
Some State funds derived from motor vehicle users are diverted by the Legislature to other State operations and activities, as stated above.
13
Chickamauga Creek Bridge between Ft. Oglethorpe and LaFayette
ORGANIZATION CHART OF THE HIGHWAY DEPARTMENT- STATE OF GEORGIA 1930
p,Jrchasmg Agenf
Adopll!>a':
J. W. B,zmell If". C. Vaeen .!. R. Phillips
STATE HIGHWAY BOARD OF GEORGIA
OFFICIALS AND PERSONNEL OF THE BOARD AS OF
JUNE 30, 1931.
============~===========--------------
Name
Title
Location
J. W. Barnett
Chairman, State Highway Board Atlanta
John R. Phillips . Member, State Highway Board Louisville
W. C. Vereen. ________ Member, State Highway Board -Moultrie
F. P. Vanstory . __ Treasurer, State Highway Board.. Atlanta
Sam M. Mathews.. __ Secretary, State Highway Board. _. Atlanta
Ralph Moore_. ___ _ . Purchasing Agent.___
__Atlanta
B. P. McWhorter.
State Highway Engineer.
. Atlanta
E. N. Parker.
. Asst. State Highway Engineer Atlanta
C. W. Wright
Principal Assistant Engineer
Atlanta
B. C. Milner
_Assistant Engineer_
Atlanta
Searcy B. Slack. __ __ Bridge Engineer_. __ _
Atlanta
L. B. Ackerman. -Engineer in Charge of State Forces Atlanta
Geo. C. Blount __ Maintenance Engineer.
Atlanta
E. N. Seymour. J. E. Boyd_ M. E. Cox __ _
__ Office Engineer ___ _
IResearch Engineer __
_ Federal Contact Engineer
Atlanta Atlanta Atlanta
W. F. Montgomery_ First Division Engineer..
. _ Cartersville
E. A. Fish
_ Second Division Engineer. . __ Gainesville
W. S. Dennis_
Third Division Engineer ____ .
Thomaston
Henry E. Newton ____ Fourth Division Engineer_
Louisville
E. A. Stanley.
. _ Fifth Division Engineer
Moultrie
H. J. Friedman
Sixth Division Engineer
. Waycross
16
ANNUAL REPORT. To His Excellency,
May 19, 1932.
Ron. R. B. Russell, Jr.,
Governor of Georgia,
Atlanta, Georgia.
Dear Sir:
In compliance with the law applying to the duties of the State Highway Board of Georgia, we are submitting to your Excellency for consideration, a report of the activities of the Board for the Fiscal year beginning July 1st, 1930, and ending June 30th, 1931.
The additional funds received from the increased gasoline tax (effective since September 1st, 1929), together with the increase in Federal funds apportioned to the State, have enlarged our Construction program so that there were placed under construction two hundred twenty-eight (228) road projects, totaling one thousand two hundred eighty-eight (1,288) miles of which one hundred forty-eight (148) road projects, eight hundred seventeen (817) miles in length, were completed. Also, one hundred nine (109) bridge projects aggregating three and nine-tenths (3.9) miles in length were completed.
The Board received from all sources the sum of $19,713,063.00 and expended for all purposes $17,468,141.00. The accompanying report of the Accounting Department shows in minute detail the receipts and expenditures of the Board. For your convenience, we submit the percentage of receipts from different sources and percentage of expenditures for different purposes, as follows:
RECEIPTS
From Motor Vehicle Fees .................... . 21.1% From Fuel Oil Tax .......................... . 45.1% From Counties, Cities and Railroads .......... . 5.6% From Federal Aid .......................... . 28.0% From Miscellaneous Sources ................. . .2%
EXPENDITURES
For Construction ........................... . 81.3% For Maintenance ........................... . 12.5% For Administration (Overhead) ............... . 2.6% For Land, Buildings and Equipment .......... . 3.6%
As predicted in that part of the letter of transmittal in twelfth report referring to the expenditures for the last half of the Fiscal
17
year 1929-1930, the percentage of Maintenance and Equipment shows a decided reduction for the period ending June 30, 1931 Also, Administration (or Overhead) shows a total of 2.6% for the Fiscal year ending June 30, 1931, compared to a percentage of 3.1% for the last six months of the Fiscal year ending June 30, 1930. A decrease was predicted in the twelfth report because of anticipated increase of funds and economy of operation resulting from changes in organization. We again call attention to the fact that the law allows 6% for overhead.
It is the policy of the Board to close gaps with paved roads as rapidly as possible, especially on the Federal system. In the participation of constructing these roads the Federal Government's share is about one-half. The records of the Bureau of Public Roads at Washington show that Georgia stands at the top of the ten South-Eastern States in completed roads with Federal Aid, also, that our State has availed itself of more Federal Aid apportioned to it than any of these states except two. In closing the gaps referred to, consideration must be given to the Federal System, County seat to County seat System, Congressional Districts, Commissioners Divisions, and all regulations consistent with the laws and rules in force, so that the work will be distributed as nearly as can be to equalize mileage according to the divisions and sub-divisions of the State.
The activities and achievements of the Board and all branches of the Highway Department for the Fiscal year ending June 30, 1931, will be found in narrative and statistical detail on the succeeding pages of this report.
We wish to acknowledge your Excellency's attitude of appreciation of the efforts of the Board toward the betterment of the State Road System.
Respectfully submitted,
J. W. BARNETT, Chairman.
State Highway Board of Georgia.
JOHN. R. PHILLIPS, Member.
W. C. VEREEN, Member.
18
State Highway Board of Georgia,
May 25, 1932.
Atlanta, Georgia,
Gentlemen:
On the succeeding pages of this report, covering the section devoted to Accounting, you will find a full and detailed record of the accountability of your Treasurer for the Fiscal year ending June 30, 1931.
It gives me pleasure to state that many difficulties experienced in the past in meeting our obligations have been overcome by a strict adherence to a revised budget and allotments pertaining thereto. We are able to anticipate with reasonable accuracy all necessary demands on the Board that our income will permit.
Our revised system of accounting is functioning smoothly and I trust to your satisfaction.
Permit me to thank each member of the Board for the cooperation and consideration shown me.
Respectfully submitted,
F. P. VANSTORY,
Treasurer.
State Highway Board of Georgia,
Atlanta, Georgia.
Gentlemen:
I am pleased to submit to you a report of the State Highway Engineering Department for the Fiscal year ending June 30, 1931.
There has been more accomplished than in former years, owing largely to the fact that we have had a full twelve month period of revenue from increased gasoline tax and the further fact that more Federal funds have been apportioned to the State.
We have completed more miles of road and placed under construction more miles than during any similar period. Also, many important bridge structures have been completed and are being constructed. Our survey, drafting and laboratory branches have all shown an increase in work. The general condition of all roads on the State System has been much improved by the Maintenance forces. Equipment is more modern and standardized.
You will find notes and tables of Engineering and other Activities in the following report which needs no further comment.
I wish to thank the members of the Board on behalf of myself and my staff for their assistance and cooperation.
Respectfully submitted,
B. P. McWHORTER,
State Highway Engineer.
19
ro 0
State Route No. 8, Madison County- Bridge over Hudson River
ALPHABETICAL LIST OF GEORGIA COUNTIES SHOWING ENG. DIV., CONG. DIST., COMMISSIONERS DIST.,
AREA, POPULATION, STATE MILEAGE, POP. PER SQ. MI. AT JUNE 30, 1931
County
= ..,+>
.Sl bO~
1=&1~~
bO"t: =O~~
0~
Area
1930 Po pula-
tion
State Pop. Mileage Sq. June 30, Mi. 1931
":'+su>
o.!i
0~
- - - - - - - - - - - - - - - ~- ~~-
-~~ ~- ~--
~-~-
-~
Appling _______ --
6 11 454 13,314 29 62.715 1
Atkinson _______ Bacon _________
-
- 6 11 330 6,894 21 49.343 1 6 11 271 7,055 26 32.940 1
Baker_ _______
---
-
5
2 357 7,818 22 32.770 1
B a l d w i n ____ Banks _________
- - 4 10 307 22,878 74 44.200 2 2 9 222 9,703 44 29.400 3
Barrow ______ -
-2
9 168 12,401 74 35.076 3
Bartow ______ .. _ -
---
1
7 471 25,364 54 59.434 3
Ben HilL _____ B e r r i e n _________ Bibb _________
-
-
-
-
-
-
--
Bleckley______ - ---
B B B B B
rururoaylrlnoakoktneclse__h___y____________________________________-- __-_--__----_.----_----_---
-
5 5
3 4
6
5 6 4 4
3
11 6 12
11 11 1
1 1
256 13,047 51 455 14,646 32 277 77,042 278 205 9,133 44 434 6,895 15 514 21,330 41 431 5,952 14
668 26,509 39
956 29,224 30
13.301 1 56.160 1 49.165 2 32.425 2
27.048 1 73.450 1 62.038 1 70.590 2
81.595 2
Butts _______________
3 6 203 9,345 46 31.058 2
Calhoun_ ______ _______ 5
2 284 10,576 37 40.100 1
Camden ________________ 6 11 711 6,338 9 42.303 1
Campbell_______________ 1
5 211 9,903 47 20.090 3
Candler ________________ 4
1 228 8,991 39 27.050 2
Carroll _________________ 1
4 492 34,272 70 72.890 3
Catoosa ________________ 1
7 169 9,421 56 13,431 3
CChhaarthltaomn _________________-_-_-
----
6 6
11 1
792 4,381 5! 19.238 1 370 105,431 285 58.316 1
Chattahoochee ____ ---- 3
4 218 8,894 40 37.840 2
Chattooga ____ . _ - ----- 1
7 328 15,407 47 32.483 3
CCClhlaaeyrrk_o_ek___e__e__._. ___________-_- __-_--_--_--_--_--_--
1 2 5
9 429 20,003 47 41.799 3 8 114 25,613 224 30.570 3 3 203 6,943 34 37.411 1
Clayton ____ .. ___________ 1 6 142 10,260 72 28.610 3
C l i n c h __________
6 11 747 7,015 9! 67.811 1
Cobb __________________ 1
7 353 35,408 100 52.797 3
Coffee __________________ 6 11 632 19,739 31 33.156 1
Colquitt _________ ------ 5
2 529 30,622 58 77.880 1
CCooolukm__b_i_a____________-_-_-_--_-_-_-__-
4 5
10 11
350 8,793 25 241 11,311 47
34.000 2 44.470 1
Coweta_________________ 3 4 443 25,127 57 74.490 2
Crawford ______________ 3 6 319 7,020 22 45.320 2
Crisp___________________ 5
3 277 17,343 63 41.651 1
Dade ___________________ 1
7 186 4,146 22 24.100 3
DDDaeewKcasatolubnr__________________-_-_-_--_--_--_--_--_--_--_--
2 5 2
9 216 3,502 16 32.384 3
2 583 23,622 41 54.392 1 5 272 70,278 258 33.837 3
Dodge __________________ 4 12 431 21,599 50 48.490 2
Dooly____________________ 3
3 397 18,025 45 45.515 2
21
ALPHABETICAL LIST OF GEORGIA COUNTIES SHOWING ENG. DIV., CONG. DIST., COMMISSIONERS DIST.,
AREA, POPULATION, STATE MILEAGE, POP. PER SQ. MI. AT JUNE 30, 1931
County
=.Sl ~~ b.O""~'
d...
~ ..,
bO"C
do t...l.
State 1930 Pop. Mileage Area Popula- Sq. June 30, tion Mi. 1931
.,..~,
o ....
11o;1j::l Oj::l
Oj::l
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
---
~-----
Dougherty_
5
2 342 22,306 65 24.827 1
Douglas
1
5 208 9,461 45 18.640 3
Early_ Echols _______ --
5
2 524 18,273 35 55.900 1
6 11 362 2,744 7! 26.800 1
E f f i n g h a m ____
4
1 448 10,164 23 35.000 2
Elbert_ --Emanuel ______
2
8 361 18,485 51 74.100 3
4 12 764 24,101 31 107.257 2
Evans __
6
l
287 7,102 25 20.578 1
Fannin ----
1
9 401 12,969 32 45.008 3
Fayette ____
3
6 234 8,665 37 23.610 2
Floyd __ ---.
1
7 502 48,667 97 78.997 3
Forsyth __ -
2
9 247 10,624 43 28.300 3
Franklin __
2
8 279 15,902 57 51.540 3
Fulton ___
1 5 193 318,587 1,650 7.790 3
Gilmer _____
1
9 440 7,344 17 35.372 3
Glascock ___ Glynn ____
4 10 170 4,388 26 14.375 2 6 11 439 19,400 44 53.804 1
Gordon __
1
7 375 16,846 45 56.245 3
Grady ____
5
2 444 19,200 43 56.020 1
Greene_
2
8 416 12,616 30 60.300 3
Gwinnett_
2
9 440 27,853 63 72.470 3
H a b e r s h a m ___
2
9 290 12,748 44 39.570 3
HalL ____
2
9 437 30,313 69 76.454 3
Hancock___
4 10 530 13,070 25 62.800 2
Haralson ___
1
7 284 13,263 47 34.711 3
Harris ----
3
4 501 11' 140 22 43.560 2
Hart_ --Heard ______
2
8 261 15,174 58 48.690 3
3
4 285 9,102 32 39.170 2
Henry ____
3
6 324 15,924 49 44.950 2
Houston _____
3 12 443 11,280 26 63.850 2
Irwin __
5 11 378 12,199 32 42.480 1
Jackson_
2
9 355 21,609 61 58.340 3
Jasper -----
3
6 321 8,594 27 68.250 2
Jeff Davis_
6 11 300 8,118 27 24.836 1
Jefferson____
4 10 646 20,727 32 90.000 2
Jenkins____
- --
4
1 342 12,908 38 40.000 2
Johnson ____
4 12 292 12,681 44 30.716 2
Jones ____ ----
3
6 377 8,992 24 50.109 2
L a m a r _________ Lanier_ _______
-3
6 184 9,745 53 32.380 2
- 6 11 191 5,190 27 40.820 1
Laurens _____ Lee _______
----
-----
4 -5
12 3
806 32,693 40 326 8,328 25
75.823 2 26.900 1
Liberty_ ---Lincoln ____
----
-
----
1 2
1 10
543 291
8,153 15 7,847 27
34.734 1 32.600 3
Long __ - ---
- - - - - -
6
1 393 4,180 11 45.263 1
Lowndes _________ 5 --- 11 483 29,994 62 74.690 1
Lumpkin _________
-2
I
9 I 280 4,927 18 46.200 3
22
ALPHABETICAL LIST OF GEORGIA COUNTIES SHOWING ENG. DIV., CONG. DIST., COMMISSIONERS DIST.,
AREA, POPULATION, STATE MILEAGE, POP. PER SQ. MI. AT JUNE 30, 1931
County
l'l
0
bD:~
l'l.... 10:1~
~
<.>
bO'C lo'l.t...;.
0~
Area
State 1930 Pop. Mileage Popula- Sq. June 30, tion Mi. 1931
So=~.S.~...
0~
- - - - - - - - - - ---~---- - - - - - - - -
McDuffie_
4 10 287 9,014 32
Mcintosh ___ Macon ____
--
6
1 470 5,763 12
3
3 332 16,643 50
Madison ___ Marion _____
--
2
------
3
8 284 14,921 53 4 360 6,968 19
Meriwether_
----
3
Miller_ ____
5
Milton______ ----
-2
MitchelL ___
--
5
4 496 22,437 45 2 253 9,076 36 9 137 6,730 49 2 548 23,620 43
Montgomery_
6 12 190 10,020 53
Monroe _____
----
----
3
6 470 11,606 25
Morgan_ ----
--- . ----
2
Murray _____ . --- ---- - 1
8 390 12,488 32 7 342 9,215 27
MNeuwsctoogne_e_________--Oconee ______
--
.. ------
--
3 2 2
4 235 57,558 245 8 262 17,290 66 8 172 8,082 47
Oglethorpe_ --- -- ---- 2
8 504 12,927 26
Paulding ___ Peach_______
-- . -- -.
-
1 3
7 12
324 12,327 38 179 10,268 57
P i c k e n s _____
1
9 231 9,687 42
Pierce _____
6 11 345 12,522 36
Pike _______ --- --
3
6 237 10,853 46
P o l k ______
-- -----
1
7 317 25,141 79
Pulaski__ __ -Putnam ____
-
---- ---- ---
3 4
12 8
258 361
9,005 35 8,367 23
Quitman_ ---Rabun ______
--- ---
- ------
5 2
3 144 3,820 26 9 377 6,331 17
Randolph .
5 - --- ---
3 412 17' 174 41
Richmond ___ ------- -
4
10
319 72,990 229
Rockdale __ Schley_______
- - - - - - - -
----
----
2 3
5 119 7,247 61 3 154 5,347 35
Screven ______
4
1 794 20,503 26
Seminole _______ --
5
S p a l d i n g __________ ----
3
Stephens ______ -- -- 2
Stewart______ . -- -
5
2 240 7,389 31 6 209 23,495 112
9 166 11,740 71 3 411 11,114 27
Sumter_ _____ Talbot________
--
. -----
-
----
5 3
3 456 26,800 59 4 312 8,458 27
Taliaferro ____
---- -
2
10
212
6,172 29
TattnalL ____ Taylor_ _____
----------
------
6 3
1 466 15,411 33 3 340 10,617 31
Telfair _____ ------- ---- 6
12
373 14,997 40
TerrelL ___ - --- .. ----'"-
5
3 322 18,290 57
T T
hifotm__a_s_________-_-_-_-__-_- _.._-_-_-_-
5 5
2 530 32,612 61 2 243 16,068 66
Toombs ________________ 6 Towns _________________ 2
12 9
393 17' 165 44 181 4,346 24
41.206 2 33.006 1 51.600 2
58.950 3 34.550 2 55.250 2 46.380 1
10.000 3 54.946 1 23.395 1 43.640 2
51.500 3 51.616 3 50.476 2 40.180 3
37.260 3 58.500 3 20.854 3 30.519 2 44.821 3 21.896 1 38.931 2 40.692 3 54.685 2 58.800 2 36.660 1 40.290 3 39.080 1 68.036 2
8.958 3 28.783 2 46.100 2 15.900 1 38.693 2 25,659 3 67.950 1 76.580 1 45.846 2 13,000 3 68.860 1 33.760 2 35.995 1 29.641 1 73.100 1 48.040 1 43.136 1 28.580 3
23
ALPHABETICAL LIST OF GEORGIA COUNTIES SHOWING ENG. DIV., CONG. DIST., COMMISSIONERS DIST.,
AREA, POPULATION, STATE MILEAGE, POP. PER SQ. MI. AT JUNE 30, 1931
County
r:l
.9
...~ ...,.
bD~
r:l ...
bo ..
r:lt;
0...
Area
!Oil~=! Ol=!
----
State 1930 Pop. Mileage Popula- Sq. June 30, tion Mi. 1931
~~
oll
Ol=!
----- -
Treutlen________________ T r o u p __________________ Turner _________________ Tw1ggs _________________ U n i o n __________________ Upson __________________ VValker _________________
\Valton _________________ VVare ___________________
VVarren _________________
4 3
5 4 2
3 1 2 6 4
12 4
3 12 9
6 7 8
11 10
262 7,488 29
435 36,752 84 231 11' 196 48 314 8,372 27 324 6,340 20 317 19,509 61 432 26,206 60 331 21,118 64 771 26,558 35 404 11,181 28
15.800 2 56.460 2 26.218 1 51.398 2 44.160 3 61.830 2
34.303 3 45.166 3 78.716 1 42.853 2
vVvVaaysnhei_n_g__to__n___-_-_-_-_-_-_-_-_-_-_VVebster_ _______________ VVheeler ________________ VVhite __________________
VVhitfield _______________ VVilcox __________________ VVilkes __________________
VVilkinson ______________ VVorth __________________
4 6 5 6 2 1 5 2 4 5 --
10
11 3 12 9 7 12 8 10 2 --
-
669 615 302 264
245 283
403 458 472
651
-
-
25,030 12,647 5,032 9,149
6,056 20,808 13,439
15,944 10,844
21,094
---
37 20
17 35 25 73
33 35 23
32
61.300 2 56.138 1 24.110 1 46.179 1 24.500 3 46.049 3 44.290 1 51.500 3 43.909 2
55.370 1
Totals ______________ - ---- ----- 58,725 2,908,506 ----- 7,138.510 -----
NOTE:-
Additions to and deductions from the State Mileage System at June 30, 1930, make a net addition of 14.092 Miles at June 30, 1931.
The 1930 census shows a net gain over 1920 of only 12,674. A number of counties of small and average population show a considerable loss. This loss was overcome mainly in those counties with large urban gains.
24
PART T\VO ACCOUNTING
State Route No.1, Harris County, Near Pine Mountain Summit
ACCOUNTING DEPARTMENT
FISCAL YBAR 1930-1931
On January 1, 1930 as stated in previous annual report, all accounting was centralized in the General Office. This change clearly brought out the need for improved records in order to maintain complete budgetary control over expenditures and on July 1, 1930 a modern budgetary control system of accounting was installed.
Under the Budget system, the accounts in the Treasurer's office are not limited to the actual assets and liabilities, but include resources in the form of unearned estimated revenue for the fiscal year; likewise, other obligations in the form of appropriations of these revenues, specific allotments of the appropriations and encumbrances of the allotments.
The accounts representing unrealized fund resources and the commitments of these resources are known as "Fund" accounts. These fund or budget accounts are necessary as the activities of the State Highway Board are carried on in accordance with limitations and estimates set up in the Budget.
A Balance Sheet and correlative statements are prepared monthly from the accounts. These financial statements are of great value as they reflect the exact financial condition on their respective dates; also, the budget position for the balance of the fiscal year.
All transactions affecting allotments, accounts payable, and disbursements, are recorded through the use of modern accounting machines. By the use of collating forms on these machines, several records are prepared in one operation and at the same time all account balances are automatically computed and all columns automatically totaled. Notwithstanding the fact that the volume of detail handled is very large, accurate and prompt stat~ments are rendered by the use of these machines.
An additional analysis of all expenditures is obtained through use of an electric tabulating machine in the Statistical Department. Through the use of this machine expenditures and accumulated construction costs are analyzed so as to furnish information regarding source of funds, cost, location, type and mileage of projects; also, object of expenditure, unit and activity classifications.
27
During the last two sessions of the Legislature we were called upon for numerous reports which were compiled promptly and accurately without delay or confusion; however, the preparation of same would have been very difficult without our present system and tabulating equipment.
An audit has been made of this Department by the State Auditor for the period ended December 31, 1930 and the records were found in order, all funds being properly accounted for. The fullest cooperation has been received from the State Auditor's office, and, as stated in the last report, many beneficial suggestions were made by the examiners.
Following is a complete report, consisting of four Exhibits and supporting Schedules, as taken from the records of the Accounting Department for the fiscal year ended June 30, 1931.
28
Proj. G-2-59, Barrow-Jackson- Bridge over Mulberry Creek
Exhibit "A" STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCE
JUNE 30, 1931.
Current Assets
ASSETS
Cash in Banks, Schedule No. 1
Treasurer's Account_ __ _ $ 941,166.17
Sub Treasury Accounts_ -- 1,406,204.28
Payroll Account____ _
28,481.73 $2,375,852.18
State Treasurer_ ______ _
U.S. Government Vouchers in Transit_______ _
Accounts Receivable __ Advances____ _
1, 200,000.00
116,041.92 46,912.99 47,323.93 $ 3, 786,131.02
Deferred Assets
Inventory of Materials and Supplies____________ _
Shop Jobs in Process __ _ Undistributed Charges __ Payrolls for Reimbursement__ _
$ 109,417.38 17,447.84 23,705.62 77,290.63
227' 861.47
Total Proprietary Assets--
------------------ $ 4,013,1192.49
Capital Assets
Land, Buildings and Equipment, Schedule No. 4
Land___
_____ $ 175,900.00
Buildings________
306,458.00
Automobiles__
136,558.00
Trucks_____________
385,010.00
Tractors_________
282,263.00
Other Road Equipment
409,932.00
Engineering Equipment
53,292.00
Office Equipment_______
54,492.00
Shop Equipment_____________ 56,934.00
Laboratory Equipment
21.675.00
Quarry Equipment___________ 82,258.00 $1.964,772.00
Roads andBridges.Exhibit' 'D"
Construction Expenditures to date:
On Completed Projects ______ $72,130,166.22
On Completed Projects. (No
Final Settlement with
Counties)_
____ 10,461,324.27
On Work in Process ________ 12,860,535.07 95,452,025.56
Total Capital Assets
------------------------- $ 97,416,797.56
TotaL_______
________________________________ $101,430,790.05
30
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCE
JUNE 30, 1931.
LIABILITIES Current Liabilities
Accounts Payable,Misc.... Due to Counties, Surveys and
Plans--------------------------
289.30 129,698.03
Exhibit "A'
Total Proprietary Liabilities __ Fund Bal1nces, Schedule No. 7
Construction Contracts and Allotments Unencumbered Balances
(Schedule No. 7-A) ___ _
Less: Contract Participation.
-- $
$12,180. 72? .62 1.199,107.18
Net Cash Liability _________ _
.$10, 981' 615.44 *
Less: Estimated Participation
County Cash Due________ $ 724,531.98
Federal Aid Due___
__ 3,856,019.46
Other Cash Due-
9,935.86 4,590,487.30
129,987.36
Net Cash State Lhbility
_______ $ 6,391,128.14
Other Unencumbered Allotments Survey Projects______________ $ 122,864.36
Convict Farm__ -----------
197,890.20
Maintenance Emergency__
13,366.82
Maintenance General
(Schedule No. 7-B)_
66,929.37 401,050.75
Unallotted Maintenance Ap-
propriation (Schedule No. 7-E)_________________
11,803.51
Unliquidated Purchase Orders. Etc ____________ _
521,304.94
Total Fund Balances Capital Liabilities and Surplus
Capital Liabilities Deferred Liability to Counti9s, for Construction Advances _________ _
Capital Surplus_
7,32),287.34
$25,363,624.98 72,053,172.58
Total Capital Liabilities and Surplus
---$
Current Fund Deficit
Deficit State Funds, Encumbered
against 1931-32 Income___________
$ 4,365.814.19
Less: Unrecorded Reserves:
For Assets of Doubtful Valu3, County Cash Due__________ $ 724,531.98
For Revolving Fund to cover
Inventories, Advances, etc. 2CO,OOO.OO 92l. ,)31. 98
97,416,797.56
Deficit as per books -Exhibit "B" __ _ TotaL ___ _
____ $ 3,441,282.21 Dr. ----- $101,430,790.05
*Construction Liability includes Future Paving Contracts of $476,447,91 and Deferred Payment Contracts of $538,059.76.
31
Exhibit "B"
STATIO HIGHWAY BOARD OF GEORGIA
RECONCILIATION OF FUND DEFICIT, REFLECTING FUND REVENUE,
APPROPRIATIONS AND ALLOTMENTS
JULY 1, 1930 TO JUNE 30, 1931.
FUND DEFICIT, JULY 1, 1930....
$ 4,150,604.00
FUND REVENUE
Revenue Received (Schedule No. 8)
Motor Vehicle __________
_$ 4,156,038.81
Gas Tax._______________
__ 8,885,000.00
Miscellaneous Income_.____________ 47,422.47 $13' 088' 461.28
Estimated Participation Accruals
Federal Aid Allotments. _______ $ 7,040,218.67
County Cash__________________
23,586.27
County Contract..... Other Cash..... _________________
964,419.58 27,780.41
Other Contract_________
l, 701.03
8,057, 705.96
21,146,167.24
Available for Allotments
16,995,563.24
APPROPRIATIONS AND ALLOTMENTS
Continuing Allotments (Schedule No. 7)
Construction Projects._. __ Survey Projects... ________ _
$16, 551, 385.83 286,210.53
Maintenance Emergency Projects. Convict Farm... ___________________ _
7, 793.110r. 2('(), 000.00
Maintenance GeneraL ____________ _
2,174, 912.91
Total Continuing Allotments ____ _
.$ 19,204,716.16
Non-Continuing Allotments (Schedule No. 7)
Administration General Administration. _______ $ Maintenance Administration.... Research and Analysis.. Enforcement of M. V. Law_ Quarry_____ ._. ______ _
395,492.45 32,168.24
621.01Cr. 24,287.28 4,822.30
456,149.26
Equipment Construction Equipment.. .. _$ Administration Equipment... Maintenance Equipment. ____ _
241,595.36 230,176.55 384,639.11
856,411.02
Shop Maintenance.. Total Non-Continuing Allotments..
26,113 .27Cr. .$ 1,286,447.01
Total Allotments. Continuing Appropriation (Schedule No. 7)
Maintenance Appropriation. .$ 3, 000,000.00 Less: Allotments __________________ 3,054,317.72
.$20,491,163.17
Excess Allotments over Appropriation Absorbed in Appro. Balance 7-l-30.... -.-------------
54,317. 72Cr
Total Allotments and Appropriation.
. ..$ 20,436,845.45
Fund Deficit, June 30, 1931~Exhibit "A" __ . . . ___ _
--------------------------$
3, 441,282.21
32
i -:-
:.1,r. ..
....
~ ~ ... . ... ~
State Route No. 38, Grady_County- Widened Bridge
STATE HIGHWAY BOARD OF GEORGIA
Exhibit "C"-Page 1.
STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS
JULY 1, 1930 TO JUNE 30, 1931.
State Treasurer
REVENUE RECEIPTS
Motor Vehicle License Tax....
$
Fuel Oil Tax______________________ _
4,156, 038.81 8,885,000.00 $ 13,041,038.81
Counties
Cash for Construction___________ _ Emergency Contract Credits _____ _ Construction Contract Credits......
338,832.99 320.00
705,621.94
1,044, 774.93
Railroads, Citie. Etc.
Cash for Construction.. Constmction Contract Credits.... __
$
30,137.99
36,730.51 $
66,868.50
U. S. Government
Federal .Aid Vouchers for Construction. _______________________ _
Miscellaneous Income _______________________ _
$ 5,512,958.62 47,422.47
Total Revenue Receipts __________ _
------------------- $ 19' 713, 063 .33
EXPENSE DISBURSEMENTS Adminitration, Schedule No. 11-A
General Administration General Office.. ___________________$ Division Offices.. ________________ __ Warehouse.. __ ---- __ ------------
326,327.02 81,377.35 19,458.25$
Research_______ _
Enforcement of M. V. Laws
Quarry_______
__ ________ _
427,162.62
2,380.87 24,267.28 4, 788.85 $
458,599.62
Construction, Schedule No. 11-B
Surveys Actual Surveys_________ __ _______ $ Plans__________ __ __ -- __ ----
140,655.86 59,110.57
199, 766.43
Construction
Supervision.. ___ -Actual Construction.
--.$ 551,916.54 13,447,180.45$ 13,999,096.99 $ 14,198,863.42
Maintenance, Schedule No. 11-C
General Supervision.. _____ __ __ -----------Actual Maintenance ....
97,502.71 2,026,622.98$
2, 124,125.69
Emergency Supervision. ------------- _________$ Actual Emergency------ __ ----------
1, 441.25 68,229.81
69,671.06 $ 2, 193,796.75
34
STATE HIGHWAY BOARD OF GEORGIA
Exhibit "C"-Page 2.
STATEMEN r OF REVENUE RECEIPTS AND EXPENSE Dl SBURSEMENTS
JULY 1, 1930 TO JUNE 30, 1931.
EXPENSE DISBURSEMENTS-Cont'd.
Land, Buildings and Equipment, Schedule No. 11-D
Administration Land and Buildings _______________ $ Equipment_ ________________________ _
179,115.42 49,788.92
228,904.34
Construction Equipment_ ____________ _
Maintenance Land and Buildings _______________ $ Equipment_________________________ _
Convict Farm __________________________ . ____ _
17,050.02 187,795.01
181,022.46
204,845.03 $
61-l, 771.83 2,109.80
Total Expense Disbursements, Schedule No. ll-------------------- 17,468,141.42
Excess Receipts ove!' Disbursements _______ _
$ 2, 244,921.91
ADD
Excess Proprietary Assets over Labilities, July 1, 1930--------------------
Excess Proprietary Assets over Liabilities, June 30, 1931, Exhibit "A"----------------------
!, 639,083.22 3,884,005.13
RECONCILIATION
Excess Proprietary Assets over Liabilties (Above) Available for LiQuidation of Fund Balances... _________________ _
Fund Balance,;, June 30, 1931. (Contracts, Allotments, Purchase Orders, Etc.l-------------------------------------
Fund Deficit-Exhibit"A" .. ------------
$
3,884,005.13
7,321'.287.34 3, 411.282.21
35
REVENUES&EXPENrnTURES
CHART SHOWING RELATIVE AMOUNTS RECEIVED FROM OlFFERENT SOURCES & RELATIVE AMOUNTS EXPENDED FOR DIFF'ERENT PURPOSES FOR EACH DOLLAR JULY-l-1930 THROUGH JUNE-30-1931.
HIGHWAY
DOLLAR
REVENUES
EXPENDITURES
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF CONSTRUCTION JUNE 30, 1931.
Exhibit "D"
Total Allotments
Net Encumbrances
Payments
Total Charges
Cost to Complete
State
Federal
County
Other
Total Allotment
Open Projects. ________ $ 25,178,975.40 $135,717.71 $12,860,535.07 $12,996,252.78 $12.180,722.62 $13,821, 8CO .35 $ 8, 597,565.60 $ 2, 718,061.38 $ 39,548.07 $ 25, 176,975.40
Closed Projects
Construction Com-
pleted, but final
settlement not
made with County_ 10,461,324.27 _
10,461,324.27 10,461,224.27 --
5,602,841.33 2,155,903.74 2,631,196.25 71.332.95 10,461,324.27
Closed. Settlement
with County ___ _ 72,130,166.22---
72,130,166.22 72,130,166.22-
28,828,522.48 20,961,274.27 21,038,006.51 399,362.96 72,130,166.2.~
------- ---+--------------------------------------------
Total Closed Pro-
jects..
-$ 82,591,490.49-- ----$82,591,490.49$82,591,490.49
-$34,431,363.81$23,120.178.01$24,539,202.76$470,745.91$ 82,591,490.49
Total Projects __ _
107,768,465.89 135,717.71 95,452,025.56 95,587.743.27 12, 180,722.62
~Total Allotment Distribution... Total Construction Funds Received _____ _
48,253,164.16 31,717,743.61 27,287,264.14 510,293.98 107,768,465.89 41,852,036.02 27,861,724.15 25,363,624.98 500,358.12 95,587,743.27
Total Construction Funds Due ________________________________________ _
Deduct Contract Participation-To Reduce Encumbrance to Cash Basis...
-$6,391,128.14$ 3,856,019.46$ l,923,fr39.l6 $ 9,935.86$ 12,180,722.62 - $ 1,199,107.18 -------------- ------------- 1,199,107.18 ----------- 1,199,107,18
Net Cost to Complete....
- $10,981,615.44
Net Construction Funds Due
State___
____________ _
----- $ 6,391.128.14
FederaL-------
------- $ 3,856,019.46
CountY Cash
- $ 724,531.98
Other Cash._
.$9,935.86
Total Funds Due..
- $ 10,981,615.44
Schedule No. 1. STATE HIGHWAY BOARD OF GEORGIA.
BANK BALANCES.
JUNE 30, 1931.
Treasurer's Account Fulton National Bank___________________ _
$ 941,166.17
Sub-Treasury Accounts
First National Bank, Main Office, Atlanta_ 326,302.75
Citizens & Southern Nat. Bk. Main Office, Atlanta ________________________________ _ 332,082.25
Fulton National Bank, Project Acct., Atlanta ________________________________ _ 36,137.53
Fulton National Bank, Federal Emerg., Atlanta ________________________________ _ 169,308.77
Citizens & Southern Nat'l. Bk., Athens __ _ 54,482.69 National Bank of Athens ________________ _ 24,249.87
Georgia Railroad Bank, Augusta ________ _ 29,856.18
National Exchange Bank, Augusta ______ _ 14,295.42
First National Bank, Cartersville ________ _ 25,362.89
Columbus Bank & Trust Co., Columbus__ 14,506.66
First National Bank, Columbus _________ _ 22,817.51
Fourth National Bank, Columbus_______ _ 24,994.03
Merchants & Mechanics Bank, Columbus_ 20,030.30
Hardwick Bank & Trust Co., Dalton_____ _ 48,216.77
Citizens Banking Co., Eastman__________ _
4,971.91
Citizens Bank, Gainesville_______________ _ 16,689.08
First National Bank, Gainesville ________ _ 24,538.41
Pickens County Bank, Jasper_ __________ _ 24,938.13
First National Bank, Lavonia ____________ _ 24,213.87
First National Bank, Louisville__________ _ 23,163.04
First National Bk. & Trust Co., Macon __ _ 12,285.89
Citizens National Bank, Marietta________ _ 19,938.75
Merchants & Farmers Bank, Marietta ____ _ 24,975.94
Moultrie Banking Co., Moultrie__________ _ 24,749.93
National City Bank, Rome _______________ _ 15,542.69
Liberty National Bank & Trust Co., Savannah_____________________________ _
12,980.27
Citizens & Southern Bank, Thomaston__ _ 18,798.27
Citizens & Southern Nat'l. Bk., Valdosta_ 15,774.48
------
Payroll Account
First National Bank, Main Office, Atlanta_
1,406,204.28 28,481.73
Total Cash in Banks-Exhibit "A" ___ _
2,375,852.18
38
DESCRIPTION
STATE HIGHWAY BOARD OF GEORGIA LAND, BUILDINGS AND EQUIPMENT,
JUNE 30, 1931.
Appraisal Value
July 1, 1930
Additions For Fiscal Year 1930--31
Total June 30, 1931
Depreciation For Fiscal Yr.
1930--31
Schedule No. 4
Appraisal Value
June 30, 1931
Land ___________ B u i l d i n g s _______
-- -------------$
--- .. --------- ..
Automobiles ____ .. . ---------- ---
Trucks ____________ ------------
Tractors ______________ -------
Other Road Equipment _______ ---
Engineering Equipment__ ---
Office Equipment______
--
Shop Equipment _____ ---- . ----
Laboratory Equipment__ ----Quarry Equipment ______ --- ----
--
Total-Exhibit "A" ____ ---- $
175,900.00 $ __ --------------$
110,357.00
196,165.44
92,909.00
87,220.06
408,016.00
90,896.47
320,530.00
65,525.43
388,687.00
115,137.47
31,734.00
24,643.21
40,022.00
18,411.19
42,084.00
6,111.33
13,485.00
10,661.23
83,088.00 ---- . -- ----------
1, 706,812.00$
614.771.83 $
175,900.00 $ __ --- ---------- $
306,522.44
64.44
180,129.06
43,571.06
498,912.47
113,902.47
386,055.43
103,792.43
503,824.47
93,892.47
56,377.21
3,085.21
58,433.19
3,941.19
48,195.33
8,738.67Dr
24,146.23
2,471.23
83,088.00
830.00
2,321,583. 83$
356,811.83 $
175,900.00 306,458.00 136,558.00 385,010.00 282,263.00 409,932.00 53,292.00 54,492.00 56,934.00 21,675.00 82,258.00
1,964,772.00
Proj. 405-A, Thomas County, Thomasville to Tallahassee, Concrete 20ft.
Route 3.---Concrete. Between Thomasville and Tallahassee.
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ALLOTMENTS, APPROPRIATIONS, AND FUND BALANCES, ALSO
REFLECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS JULY 1, 1930 TO JUNE 30, 1931.
Schedule No.7
Net
Estimated I
Fund Balances Participation Fund Balances Allotments
Net Encum- Expenditures
Total
Estim1ted
Net
Fund Balances Participation Fund Bal1nces
July 1, 1930 July 1,1930 July 1,1930
brances
Charges June 30, 1931 June 30, 1931 June 30, 1931
- - - - - - - - - - - - - - - - - - - - - ..- . - - - - - - - - - - - - - - - - - - - - - . - - - - 1 - - - - - -
ALLOTM.ENTS
Continuing Allotments
Construction Projects
(Schedule No. 7-A)_._ 1$5,407,980.92 $4,356,170.57 $ 9, 764, 151.49 $16,551,385.83 $135,717.71 $13,999,096.99$14,134,814.70 $12, 180,722 .62>5, 789,594.48 $6,391,128.14
SurveyProiects________ 36,700.58
36,700.58 286,210.53 280.32 199,766.43 200,046.75 122,864.36
122,864.36
EmergencyProjects.-.. 90,510.99
320.00 90,830.99 CR7,793.ll.
69,671.06 69,671.06 13,366.82 .. --------- 13,366.82
ConvictFarm--------. __________ .
____________ 200,000.00.
2,109.80
2,109.80 197,890.20
197,890.20
Maintenance General
Schedule No. 7-B_
153,741.33 .
153,741.33 2,174,912.91 137,599.18 2,124,125.69 2,261,724.87 66,929.37
66.929.37
Total Continuing NAdc;~~~~;;~~:~ts _ $5, 688,933.82 $4,356,490.57 $10,045,424.39 $19,204, 7Hi.~6 $273,597.21 $16,394,769.97$16,668,367.18 $~:!,581,773.37 $(i,'7~9, ~4. 48 $6, 7::~178 .89
(Schedule No. 7-C)__ 1$ 4,883.40 - - . - $ 4,883.40$ 427,660.69$ 5,381.47$ 427,102.62$ 432,544.09
Research and Analysis
(Schedule No. 7-C).
3,627.75 --
3,627.75 CR62l.Ol 625.87
2,380.87
3,006.74
Enforcement of M. V.
Law (Schedule No.
7-Cl------------------ ------------- ----------- -----------Quarry (Schedule No.
24,287.28
20.00 24,267.28 24,287.28
7-Cl------------------. ----------- ---------- _
4, 822.30
33.45
4, 788.85
4,822.30
Equipment (Schedule
s~~-:~~):::::::::::::: 1 -26;i2i:ii:i
..
856,411.02 241,639.19 614,771.83 856,411.02
26, 121.02 CR26, 113.27
7. 75 .
7. 75
----1------ ----- -------- ----- -----------
Total Non-Continu-
1 ing Allotments.. ~,632.1~----_ _- ~ 34,632.17 $1,28(),44~.()1~~:707.73$_1,073,371.45$1,321,079.18 ~--~--..:..::_:___:--~
Total Allotments ... _ $5,723,565 .99l$4, 356,490.57 $10,080,056.56 $20,491, 163.17 $521,304.94 $17,468,141.42$17,989,446.36 $12,581,773.371$5,789,594.48 $6,792,178.89
1
1
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ALLOTMENTS, APPROPRIATIONS, AND FUND BALANCES, ALSO
REFLECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS JU LV 1, 1930 TO JUNE 30, 1931.
Schedule No. 7-Cont'd.
Net
Estimated
Fund Balances Participation Fund Balances
July 1, 1930 July 1, 1930 July 1, 1930
Allotments
Net
Encumbrances
Expenditures
Total Charges
Estimated
Net
Fund Balances Participation Fund Balances
June 30, 1931. June 30, 1931. June 30, 1931.
APPROPRIATION-
Continuing
Maintenance Appro- j priation(Schedule No. 7-E) ... -----------$ 66,121.23------------- $
66,121.23 $ 3, 000,000.00 Appropriation 3,054,317.72 OR Allotments
--------------$ 11,803.51-------------$ 11.803.51 ----------1---------1-----------------
Total Appropriation.!$ 66,121.231------------- $ 66,121.23$ 54,317.72 OR... ____ ---------- --------------$ 11,803.51 ..
--$ 11,803.51
- - - - --~-- - - - - - 1 - - - - 1 - - - - - 1 - - - - - - - - - - - - - - - -
Net Fund Balances.
.July I. 1930........... 1$5,789,687.22
1
Estimated Participation, July l. I
1930.-------------------------------- 1$4,356,490.57
Fund Balances. July 1. 1930... ________________ $10,146,177.79
Allotments for Year-Exhibit "B" ------------
- $20. 436. 845 .45
Net Encumbrances for year-Exhibit "A" _
- $521,304.94
Expenditures for Year-Exhibit "0" ____ _
-------------- $17,468,141.42
Total Charges for Year __ -------------
--- $17,989,446.36
Fund Balances, June 30, 1930................ .
----------- $12,593,576.88
Estimated Participation, June 30. 1930
---------------- $5,789,594.48
Net Fund Balances, June 30. 1930.-ADD
Unliquidated Purchase Orders. etc____________ _
--------------------------- $6,803,982.40 521.304.94
Total Fund Balances, Net, .June 30. 1930-Exhibit "A"
--------------$7,325,287.34
Schedule No. 7-A.
STATE HIGHWAY BOARD OF GEORGIA
DETAIL OF CONSTRUCTION UNENCUMBERED ALLOTMENTS,
BY CLASS OF PROJECT.
JUNE 30, 1931.
Unencumbered Allotments
Regular Contracts___
____ $
Emergency Federal Aid Contracts__ _
County Contracts, Recorded from
Board Resolutions, Detail Esti-
mates not yet Prepared_
State Force Projects, Division Forces
State Force Projects, Asphalt Forces
Total Unencumbered Allotments Less: County Contract Participation
5,839,360.57 3,495,875.25
1,821,677.56 197,215.33 826,593.91
-~~---
$
12,180,722.62 1,199,107.18
Net Cash Liability ________ _
10,981,615.54
Less: Estimated Cash Participation
County Cash Due _____________ _ Federal Aid Due _______________ _ Other Cash Participation Due __
Net Cash State Liability __________ _
724,531.98 3,856,019.46
9,935.86
$
4,590,487.30 6,391,118.24
44
State Route No. 1, Early County, North of Blakely Bridge Raised and Widened
State Route No. 38, Grady County, West of Cairo Bridge Widened 45
STATE HIGHWAY BOARD OF GEORGIA
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS BY UNITS AND CONGRESSIONAL DISTRICTS JUNE 30, 1931.
Schedule No. 7-B
I Unencumbered
I Allotments July 1, 1930
Allotments
Unencumbered
I I I Net
Expenditures Total Charges
Encumbrances
Allotments June 30, 1931
DIVISION NO. 1.
1-4____ ---- ---- $ 1,392.70
21,800.83 $ 1,415.39 $ 17,762.38 $ 19,177.77 $
1-5___ .. -------1-6____ ------ ---
1,483.27 546.65
1$
18,036.01 8,379.12
673.98 446.32
21,289.15 7,434.83
21,963.13 7,881.15
1-7____________ . 10,513.82
198,056.08
11,176.27
195,683.14
206,859.41
1-9 _____________
2,873.67
44,338.99
3,809.97
44,949.02
48,758.99
4,015.76 2,443.850R
1,044.62 1,710.49
1,546.330R
Totals. _____ $ 16,810.11 1$ 290,611.03 $ 17,521.93 $ 287,118.52 $ 304,640.45 $ 2,780.69
DIVISION NO. 2
2-5____ -- ----- $ 1,549.24 $ 12,276.24 $
685.23 $ 12,907.13 $ 13,592.36 $
233,12
2-8____ -- ----
19,989.54
174,997.51
12,268.34
170,332.95
182,601.29
12,385.76
22--190_______-__-_-_-_-___--__
19,943.84 1,546.91
194,740.03 12,231.11
10,686.49 584.34
194,512.07 13,446.06
205,198.56 14,030.40
9,485.31 252.380R
Totals._ --- $ 43,029.53 $ 394,244.89 $ 24,224.40 $ 391,198.21 $ 415,422.61 $ 21,851.81
DIVISION NO. 3.
3-3____________ $ 2,691.25 $ 43,155.41 $
3-4 _____________
7,388.80
126,991.97
3-6 ____________
8,758.59
143,341.99
3-12 ____________
2,458.59
40,731.07
3,039.09 $ 43,298.48 $ 46,337.57 $
8,013.02
121,702.50
129,715.52
7,540.35
143,019.32
150,559.67
3,328.40
39,435.11
42,763.51
490.9lOR 4,665.25 1,540.91
426.15
Totals. _____ $ 21,297.23 $ 354,220.44 $ 21,920.86 $ 347,455.41 $ 369,376.27 $ 6,141.40
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 7-B-Cont'd.
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1931.
Unencumbered
Allotments I July 1, 1930
Allotments
Net
I Expenditures
Encumbrances '
Unencumbered
Total Charges
Allotments
I June 30, 1931
4-l_ __________ $ 4-8 ___________ 4-10 ____________ 4-12 _________ --
Totals __ --- $
1,:!19.6:001{ $ 242.150R
2,017.560R 1,487 .350R
4,966.680R $
90,oou.o7 20,264.69 143,172.56 105,579.76
359.317.68
JJIVISION NO. 4.
$ 5,306.58 $ 875.52
9,454.16 3,794.49
~---------
$ 19,430.75 $
89,885.98 14,909.55 117,909.41 96,655.63
319,360.57
$ 95,192.56 $ 15,785.07 127,363.57 100,450.12
------
$ 338,791.32 $
6,lll.5lOR 4,237.47 13,791.43 3,642.29
15,559.68
DIVISION NO. 6.
5-2___ .. - 1$
I ~ 5-3-- ---~-~~~5-12 ______
17,926.62 11,924.33
1,264.59
1$
192,085.92 120,086.54
11,439.24
$
11,357.98 5,154.28
511.46
$ 186,384.62 124,206.66 12,433.59
'$ 197,742.60 129,360.94 12,945.05
$
12,269.94 2,649.93
241.220R
5-ll______
7,753.14
93,666.74
3,275.54
93,883.36
97,158.90
4,260.98
--------
------- -
---------- - ---- - - - - - - - - - -
Totals. __ $ 38,868.68 1$ 417,278.44 $ 20,299.26 $ 416,908.23 $ 437,207.49 $ 18,939.63
DIVISION NO 6
$ 6-l__ ___ - -----
8,195.89
$ 102,180.72 1$ 11,217.70
6 - l L - ------6-12 ____ ------
16,577.21 3,838.33
209,777.25 47,604.30
10,168.83 3,046.26
-~-----~-- - - - - - - - - - - - - - - ------ - - - - - - ---------------
$ 101,637.99 $ 112,855.69 $ 2,479.080R
212,308.92
222,477.75
3,876.71
48,137.84
51,184.10
258.53
---------------- -------------- ----------
Totals_
- $ 28,611.43
$ 359.562.27
$ 24,432.79
---------
$
362,084.75
$ 386,517.54
G. 0. Signs __ -$ Bridge Paint
5,440.35 $
417.86 $
.. - -- - -- ----- - - ------ - -
5,858.21
- - - - - - -
*5,858.21
--
Crews ______ - $ 4,650.68 $
739.70 $ 3,910.98
---
- $ *3,910.98
$ 1,656.16
--- ------
--
--- ----- ---
Totals ______ $ 153,741.33 $ 2,174,912.91 $ 137,599.18 I$ 2,124,125.69 $ 2,261,724.87 $ 66,929.37
*-Expend1tures for S1gns and Bndge Pamt Crews are pro-rated to the Dlv1s10ns.
STATE HIGHWAY BOARD OF GEORGIA DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS BY
UNITS AND CONGRESSIONAL DISTRICTS JUNE 30, 1931.
Schedule No. 7-B
I Unencumbered I Allotments
July 1, 1930
Allotments I
Net
I Expenditures
Encumbrances
SUMMARIZED BY DIVISION UNITS.
Unencumbered
I I Total Charges
Allotments June 30, 1931
Div. No. L -- $ 16,810.11 $ 290,611.03 $ 17,521.93 $ 287,118.52
2 __
43,029.53
394,244.89
24,224.40
391,198.21
3 ___
21,297.23
354,220.34
21,920.86
347,455.41
4 ___
4,966.680R 359,317.68
19,430.75
319,360.57
5 ___
38,868.68
417,278.44
20,299.26
416,908.23
_______ 6_ ----
28,611.43
359,562.27
24,432.79
- - - - - - - - - - - - - - - - - - ,_
- - - - --~-------
362,084.75
Totals _ --- $ 143,650.30 $ 2,175.234.75 $ 127,829.99 $ 2,124,125.69
$ 304,640.45 415,422.61 369,376.27 338,791.32 437,207.49 386,517.54
$ 2,251,955.68
$ 2,780.69 21,851.81 6,141.40 15,559.68 18,939.63
1' 656.16
-
$ 66,929.37
UNDISTRIBUTED BY DIVISION UNITS.
G. 0. Signs Bridge Paint
Crew_
Totals
Totals_
$ 5,440.35 $
417.86 $ 5,858.21
$ 5,858.21
::; 4,650.68 $
739. 700R $ 3,910.98
----------------
$ 10,091.03
---------- ------ ---
-$ 153,741.33
$
32l.B40R $ 9,769.19
- ~--
- ------
$ 2,174,912.91 $ 137,599.18
$ 3,910.98
$ 9,769.19
--------------- -- -- ---
$ 2, 124,125-69 $ 2,261,724.87
- - -
-
-
$
-----
------------- ----
66,929.:W
Schedule No. 7-B-Cont'd.
DETAIL OF MAINTENANCE UNEMCUMBERED ALLOTMENTS BY UNITS AND CONGRESSIONAL DISTRICTS JUNE 30, 1931.
I Unencumbered
Allotments
Allotments
July 1, 1930
I Net
I Expenditures
Encumbrances
Total Charges
Dist. No. L ____ $ 2___ -3___ -4___ 5 ____
6___ --
87_-_-_---9 _____ 10 ___ 1L ____ 12 ___
SUMMARIZED BY CONGRESSIONAL DISTRICTS
6,976.27 $ 192,481.39 $ 16,524.28 $ 191,523.97 $
17,926.62
192,085.92
11,357.98
186,384.62
14,615.58 8, 781.50 3,032.51
163,241.95 148,792.80 30,312.25
8,193.37 9,428.41 1,359.21
167,505.14 139,464.88 34,196.28
9,305.24 10,513.82 19,747.39 22,817.51
470.65CR 24,330.35
6,074.16
151' 721.11 198,056.08 195,262.20 239,079.02
155,403.67 303,443.99 205,354.37
7,986.67
11' 176.27 13,143.86 14,496.46 10,038.50 13,444.37 10,680.61
150,454.15 195,683.14 185,242.50 239,461.09
131,355.47 306,192.28 196,662.17
208,048.25
197,742.60 175,698.51 148,893.29
35,555.49 158,440.82 206,859.41 198,386.36
253,957.55 141,393.97 319,636.65
207,342.78
Totals ___
---~~- ---~~-----
-------~-~- ---~~-----
$ 143,650.30 $ 2,175,234.75 $ 127,829.99 $ 2,124,125.69 $ 2,251,955.68
UNDISTRIBUTED BY CONGRESSIONAL DISTRICTS.
Unencumbered
I Allotments June 30, 1931
$ 8,590.59CR 12,269.94 2,159.02 8,681.01 2,210.73CR 2,585.53 1, 710.49 16,623.23 7,938.98 13,539.05 8, 137.69 4,085.75
$ 66,929.37
G. 0. Signs _ Bridge Paint
Crew
Totals
Totals _
$ 5,440.35 $
417.86 $ 5,858.21
-----$ 5,858.21
4,650.68
739.70CR
3,910.98
3,910.98
------ - - - - - - - - - - - - - - - - - - - - - - - - - --------~~~-1~--~~---
$ 10,091.03 $
321.84CR $ 9,769.19
--------- $ 9,769.19
- - - - - - - - - - - - - ------~~---- ----~~~~-!-~~~~~- - - - - - - - - 1 - - - - - - - - - -
$ 153' 741.33 $ 2,174,912.91 $ 137,599.18 $ 2,124,125.69 $ 2,261,724.87 $ 66,929.37
Schedule No. 7-C
STATE HIGHWAY BOARD OF GEORGIA
DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS BY UNITS
JUNE 30, 193l..
====c~.~U~n=e=n=c=u=m=;b=e=r=e~d=:l=======l===-==
I
I
I Unencumbered
Allotments
Allotments
Net
Expenditures Total Charges
Allotm~nts
~-----~ Julv 1, 1930 _ _ _ _ _ _ Encumbrances _ _ _ _ _ _ __:__ _ _ _ _~ Jun3 30, 1931
G. 0.
G. 0. Mtnce:
'I
$
983.96
Mtnce. Clauns1
I$ ---
0'~
Total
983.96
Warehouse-- ]$ _ _4_32_.870R $
GENERAL ADMINISTRATION ALLOTMENTS
~97, 926.26
GENERAL OFFICE
$
4, 675.28 --$~-2-9_3_,2~5~0-.9-S-~$c---2~,9~7-,9ccc2cc6-.2=-c6c--_ _ __
22.895.16 9,273.08
76.16
23,802.96 9,273.08
23,879.12 9,273.08
330,094.50 $ __4~,7_5_1_.4_4_ _$__3_2_6,~3_2_7._0_2_ _ $ 331 '078 .46 - - - - - - - - " - - - -
19,922.22
WAREHOUSE $ _ _ _31_.1_0_~$_ _1_9~,_45_8_.2~5-~$_ _19~~4_89_._3o_-_~1_-____
DIVISIONS
No. L 2 3 4 5_ 6
TotaL
TotaL
$
470.49 $
720.42
614.69
596.05
1,139.27
761.39
--
~---
-
-- ---
$ 4,332.31 $
------------
i$ 4,883.40 $
11 '725.25 $ 12,147.64
86.82 65.29
$ 12,108.92 12,802.77
12,195.74 12.868.06
11,128.63 13,757.86
60.36 165.14
11,712 96 14,188.77
11' 773.32 14,353.91
13,050.79 15,833.80
90.34 130.98
14,099.72 16,464.21
14,190.06 16,595.19
- - - -- ---
- ---------
-- ------- ----
- - - - - --------~-
-------- -------
-- -------- --------
77,643.97 $
598.93 1$ 81 '377. 35 $ 81,976.28
---- ------------- ------"' ------------ - -----------------------
----- - - -
427,660.69 ,$ 5,381.47 1$ 427,162.62 $ 432,544.09
Schedule No. 7-C--Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
OTHER ADMINISTRATION ALLOTMENTS-RESEARCH AND ANALYSIS JUNE 30, 1931.
Unencumbered
'
Allotments
Allotments
Net
Expenditures Total Charges
July 1, 1930
Encumbrances
- - - - - - - - - - - - - - -~-----------
---~--------
- - - - - - - - - - - - - - ~-------~-
Tests
$ 2,418.50 $
Research _____
1,209.25
1, 792.630R $
625.87
1,171.62
-----------
-$ 2,380.87
625.87 2,380.87
---------- -- ---- ---------
-----
Total __
$ 3,627.75 $
621.010R $
625.87 $ 2,380.87
$ 3,006.74
Unencumbered Allotments June 30, 1931
-----
--- -
--- --- --
-
- ----- ---
ENFORCEMENT OF MOTOR VEHICLE LAW
~
,_.
--T- =-o=- -t:=a::- ::L::::- _:_:- :__c- __:- :c__- __- _- __- :__- .:__- :__ -_:~ -_:- $:_- ___~ :2_~ :42~,~ 87~ .28--~$----~ 20~ . 0~ 0 -- :$~~~ 24= , 2_= 6_7~ _2._~ 8_~ __~ _:i$~ _ _~_~ 24_,.~ _2_::_~ 8c_7~ _:2_:- _8_- __- __c_- _ _ -_ -__- :_:_:- :_::_- ::..::.- .::.::_- ::__:
QUARRY
Total_ TotaL_
1$ --sj~15----r: -45::~:~-:~~----1:-----6~.0=:=~=-~=~-=--=-=r=:-=-=-=45=:=~:=:=:-=::=~:=-~1:==4=6:==:=::=:=:=:~=======-=~
Schedule No. 7-D.
DETAIL OF EQUIPMENT UNENCUMBERED ALLOTMENTS
Admin. ___
- $ 230,176.55 $ 1,272.21
Oonstr. ____ Maint. ____
- 241,595.36 384,639.11
60,572.90 179,794.08
------ --------- ----------- ----------
Total
--
-- ..
-- -$ 856,411.02 $ 241,639.19
$ 228,904.34 181,022.46 204,845.03
$ 641,771.83
$ 230,176.55 241,595.36 384,639.11
$ 856,411.02
- - - - ---------
- - - - - - - - - - - -
---
-
-------
--- --
--- ----
Schedule No. 7-E
STATE HIGHWAY BOARD OF GEORGIA-MAINTENANCE APPROPRIATION
JUNE 30, 1931
Appropriation Appropriation Balance, July 1, 1930~~~. ~ Appropriation for fiscal year, 193G-3L~~
Total Available ___ ~ ~ ~ ___ ~ ~ ~ ~ ~ ~ _~
DEDUCT: Allotments for year Maintenance General Division No. L~~
2~ ~ ~ ~ 3~~~ 4~~ ~ ~5~-~~~~ 6~~~- ~ ~- ~- ~ ~- ~-
Bridge Paint Crew~~~~~ __ ~_ Less: Prorated to Divisions
General Office Signs_~~~_ ____ ~ Less: Prorated to Divisions~ ~ ~ ~ ~ ~ ~
$
$
10,930.11
11, 669.81
33,140.42 32,722.56
Maintenance Administration General Office~~ ___ ~ ~ ______ ~ _~ ~ ~ ~ _~ _~ __ _~ Claims~ _________ ~ _____ ~~_~_~ ..
Maintenance Equipment~~~ ___ ~~~ Shop _____ ~~_~~~~~~~_~_~~~_~~_~_~ .. ~.
Less: Shop Billings~-~-~~~_~~~_~ .. ~~~
Emergency Projects, Underruns~~
Total Allotments_~~~_~~~~~~~~~
ADD: Construction Projects Re-construction Projects~~~~_~ Construction Projects Route 9-53~ _ ~ ~ _~ ~ ~ ___ _~ ~ _~. ~ ~ _~ ~
Total Allotments and Transfers to Construction Projects~
Appropriation Balance, June 30, 193L ~ ~ .
~ ~ ~ ~ ~ ~ ~ _~ ~ ~ ~ ~ ~ ~
$
66,121.23
3,000,000.00
~$ 3' 066' 121.23
290,611.03 394,244.89 354,220.44 359,317.68 417,278.44 359,562.27
739. 70Cr
417.86
2,174,912.91
22,895.16 9,273.08
159,746.77 185,860.04
284,957.99 211,545.85
32,168.24 384,639.11
26,113.27CR 7, 793.11CR 2,557,813.88
496,503.84
~~~~~~~~~ ~~ ~$ 3,054,317.72
======= ~~~~~ ~~~~~~~ .$
11,803.51
STATE HIGHWAY BOARD OF GEORGIA
ADMINISTRATION APPROPRIATION
JUNE 30, 1931
Appropriation for fiscal year 1930-3L __ _ DEDUCT: Allotments for Year
General Administration Division No. L _____________ _
2__ - - - - - - -- - - -- - - - -- - - -- - -- - - -- -
3_____ ---------- - --------------45____________-_-__-_-_-_-_-_--_--- ---------
6__ - -- - -- - General Office___________ _ Less: Blue Print Billings ___ _
$
ll, 725.25
12,147.64
11,128.63
13,757.86
13,050.79
15,833.80
$ 362,147.21
64,220.95
297,926.26
Warehouse_______________________ _
19,922.22$
Other Administration Allotments Research and Analysis ____ _ Less: Test Billings______ _
25,176.75 25,797.76
Enforcement of M. V. Law __ Quarry________________ _
Total Allotments _______ _
Appropriation Balance __ _ DEDUCT: Balance closed into Surplus__ __
Appropriation Balance, June 30, 193L __ _
Schedule No. 7-F
---- _$ 600,000.00
395,492.45 62l.OlCR
24,287.28 4,822.30
423,981.02 176,018.98 176,018.98
00.00
STATE HIGHWAY BOARD OF GEORGIA
EQUIPMENT APPROPRIATION
Appropriation for fiscal year 1930-31
JUNE 30, 1931
Administration, Construction Equipment, and new Adminis-
tration Building___________
_________ _
DEDUCT: Allotments for Year Administration Equipment_ Administration New Building __
Construction Equipment__ Total Allotments ________ _
Appropriation Balance, June 30, 193L
$
50,831.13
179,345.42 $
Schedule No. 7-G
230,176.55 241,595.36
171 '771. 91
471 '771. 91 00.00
Proj. 253 , Clarke-Oconee-Bridge over Barbers Craek
Proj. 459, Gwinnett-Ba.rrow, between Lawrenceville a.nd Winder 55
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 8.
SUMMARY OF ESTIMATED PARTICIPATION, ALSO REFLECTING RECONCILIATION
WITH REVENUE RECEIPTS
JULY 1, 1930 TO JUNE 30, 1931
Estimated
Participation
Fund Revenue
July 1, 1930
Accrued
--------
State Treasurer
Motor Vehicle_ -------Gas Tax ____________ Counties
-- --------------- ----- $
----
--------- --- ------
4,156,038.81$ 8,885,000.00
Cash for Construction__
-$
1,039,778.70
23,586.27
Contract for Construction_ ------ --- ----Contract for Emergency____ -------- -- --Railroads, Cities, etc. Cash for Construction____________________
940,309.54
964,419.58
320.00 -- ----- --- -- - -----
12,293.44
27,780.41
Contract for Construction _________ -----Federal Aid
35,029.48
1, 701.03
Cash for Construction _________ ----------
2' 328' 759.41
7,040,218.67
Miscellaneous Income _______________________ ------------ -------
47,422.47
---
Estimated Participation, 7-1-30 ______________ $
4,356,490.57
Revenue Receipts
Estimated Participation June 30, 1931
---~
4,156,038.81 -- ---- - .. -- -8,885,000.00 ----------- -- --
338,832.99$
724,531.98
705,621.94
1,199,107.18
320.00 -----------------
30,137.39
9,935.86
36,730.51 -------------------
5,512,958.62
3,856,019.46
47,422.47 -----------
---
Fund Revenue Accrued-Exhibit "B" ______ -- --- ------------- $
21,146,167.24
Revenue Receipts-Exhibit "C" ____________ --------- ----------- . --- --- --- -- --- $
19,713,063.33
Estimated Participation,6-30--31-Exhibit''A'' ------
. ---
---- --
-- ---- -- ---- -- --- ----- $
5,789,594.48
Route 6, Paulding Co, New Bridge overS. A. L. See Old Bridge to left.
Schedule No. 9. STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL CONSTRUCTION, ALLOTMENTS, BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS) BEGINNING OF HIGHWAY DEPARTMENT TO JUNE 30, 1931
Distr. of Total of Allotments on
Mileage Basis
Funds Actually Allotted
Excess Allot. Over Mileage
Basis Distr.
District No. L__ __________ $ 2_________ -.
3 ____________ _
4 _______ _ 5_
CONSTRUCTION
Beginning of Department to June 30, 1931
9,407,251.64
$
8,572,631.18
$
9,595,886.33
8,932,146.78
8,743,447.46
6,274,379.05
7,707,386.22
8,727,111.72
$
1,019,725.50
1,348,367.79
1,990,022.59
641,654.80
6_- ----7 ___________ _
8,281,274.86 8,238,489.70
7,277,732.67 9,697,462.38
1,458,972.68
8_ ------ . ----9 _______ _
10,070,393.04 11,449,136.45
6,813,129.05 16,242,368.58
4,793,232.13
10_ ----- 1L __ 12 ___ - -
8,277,243.24 14,022,094.57 10,627,494.59
6,930,827.84 17,127,123.54 9,183,539.51
3,105,026.97
[-~~~------
Totals __ _
$ 107,768,465.89 $ 107,768,465.89 - - - - ~--
- ~ - - - - - -
- ------------------ --------
-~--------
SUMMARY OF ALLOTMENTS Beginning to January 1, 1930_ January 1, 1930 to June 30, 1930 _ July 1, 1930 to June 30, 193L _
$ 83,716,632.08 7,500,447.98 16,551,385.83
Total_
107,768,465.89
Allot. Under Mileage Basis Distribution
834,620.46 663,739.55 2,469,068.41
1,003,542.19 3,257,263.99 1,346,415.40 1,443,964.08
Schedule No. 9-Cont'd. STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL CONSTRUCTION, ALLOTMENTS, BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS) BEGINNING OF HIGHWAY DEPARTMENT TO JUNE 30, 1931
CONSTRUCTION January 1, 1930 to June 30, 1931
Funds as Actually Alloted
I
Distr. of Total
Jan. 1, 1930
Jan. 1, 1931
Excess Allot.
Allot. Under
District
of Allot. on
to
to
Total
Over Mileage
Mileage Basis
Mileage Basis
Dec. 31, 1930
June 30, 1931
Basis Distr.
Distribution
-- -
----~---
~-
No. L _
$
2 __
3_ -
2' 099' 516.32 $ 2,141,615.93 1,951,368.09
---- - - - - - - - - - -- ----
999,843.16$ 1'359,453. 40$
793,831.26
1,058.357.15
393,915.97
668,331.92
-------- ---
2' 359' 296.20 $ 1' 852,188.41 1,062,247.89
1-
259,779.88 . $
- ------
289,427 .52 889,120 .20
4__
1,720,139.29
621,009.54
513,366.97
1,134,376.51
585,762 .78
5 ___ 6 __
300,929.57 1,848,220.11
101,143.06 361,470.42
450,514.13 454,287.26
551' 657.19 815,757.68
250,727.62
- --
1,032,462 .43
7_-
8 __
-
9__
10 ___
11___
1'838, 671.30 2,247,516.64
2' 555' 225.46 1,847,320.34 3,129,459.85
800,900.71 850,936.27 2,351 ,091. 76
1,550,860.95 1,752,682.76
664,004.79 1,195,224.67
1' 103,241.10 667,034.34
1,265,801.85
1,464,905.50 2,046,160.94 3,454,332.86 2,217,895.29 4,018,484.61
--
----
899,107.40 370,574.95 889,024.76
373,765 .80 201,355 .70
----
--
12-
2,371,850.91
1,845,014.80
1,229,515.93
3,074,530.73
702,679.82
------------
-~-------
-
-- -
- - - - - - - - - - - --- - --~--- - - - - - - - - - - - - - - -- - - - - - - - - - -
Totals - --$ 24' 051 '833. 81 $ 13' 422' 700. 66'$ 10' 629' 133.151$ 24,051,833.81
_::_
--
Schedule No. 10
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS
DISTRIBUTED ON A MILEAGE BASIS) JULY 1, 1930 TO JUNE 30, 1931
Distr. of Total of Allotments
on Mileage Basis
Funds Actually Allotted
Excess Allot. Allot. Under Over Mileage Mileage Basis Basis Distr. Distribution
CONSTRUCTION
July 1, 1930 to June 30, 1931
District
No.
L $ 2_ 3_ 4_
5_ 6_ 7_ 8_
1,444, 792.31 $ 1,473,763.36
1,342,843.40 1,183. 722.18
207,086.14 1,271,861. 61 1,265,290.55 1,546, 639.45
1, 783,550.89$ 338,758.58 -------------1,590,236.47 116,473.11 --------------
768,469.01 --------------$ 574,374.39 562,170.23 -------------- 621,551.95
502,793.54 295,707.40 --------------
558,936.90 -------------- 712,924.71 911,477.26 -------------- 353,813.29 1,659,020.49 112,381.04 --------------
9_ 10_
1,758,390.77 1,271,242.43
1,696,598.83 -------------- 61,791.94 1,752,790.98 481,548.55 --------------
1L 2,153,552.95 2,710,351.23 556,798.28 --------------
12_ 1,632,200.68 2,054,990.00 422,689.32 --------------
Totals ____ $16,551,385.83$16,551,385.83 -------------- --------------
MAINTENANCE
District No. L$ 2_ 3_ 4_ 5_ 6_ 7_ 8_ 9_
10 1L 12_
July 1, 1930 to June 30, 1931
189,879.11$
193,686.58 176,480.67 155,568.46 27,215.91
167,152.02 166,288.43 203,264.18
231,093.20 167,070.64 283,026.65 214,508.90
192,481.39$ 2,602.28 --------------
192,085.92 --------------$ 1,600.66
163,241.95 --------------
13,238.72
148,792.80 --------------
6,775.66
30,312.25
3,096.34 --------------
151,721.11 -- -----------
15,430.91
198,056.08
31,767.65 --------------
195,262.20 -- -----------
8,001.98
239,079.02
7,985.82 --------------
155,403.67 --------------
11,666.97
303,443.99
20,417.34 --------------
205,354.37 -------- -----
9,154.53
Totals ____ $ 2,175,234.75 $ 2,175,234.751- ------ ----- --------------
60
Schedule No. 10-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL
DISTRICTS (ALSO A COMPARISON WITH ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS) JULY 1, 1930 TO JUNE 30, 1931
Distr. of Total of Allotments
on Mileage Basis
Funds Actually Allotted
Excess Allot. Allot. Under over Mileage Mileage Basis Basis Distr. Distribution
SURVEYS July 1, 1930 to June 30, 1931
District No. L $ 2. 3_ 4_ 5_ 6_ 7_ 8 9_ 10_ 1L 12_
Totals ____ $
24,983.69$ 25,484.67 23,220.77 20,469.21
3,580.98 21,993.34 21,879.71 26,744.86 30,406.51 21,982.63 37,239.75 28,224.41
286,210.53$
22,713.31 --------------$
2,270.38
37,120.28$ 11,635.61- ------------
21,217.30 --------------
2,003.47
17,398.76 ---- - - -- - - - - -
3,070.45
3,897.22
316.24 --------------
17,347.80 ------------
4,645.54
22,090.63
210.92 --------------
24,131.65 --------------
2,613.21
28,150.20 --------------
2,256.31
27,295.33
5,312.70 --------------
35,043.20- ------------
2,196.55
29,804.85
1,580.44 --------------
286,210.53 ------------- ------------
EMERGENCY July 1, 1930 to June 30, 1931
District No. L$ 2. 3_ 4_ 5_ 6_ 7_ 8_ 9_ 10_
1L 12.
680.270R$ 1,258.46 $
1,938.73 --------------
693.910R 2,675.63
3,369.54 --------------
632.270R 2,901.940R --------------$
2,269.67
557.350R
393.810R
163.54 --------------
97.510R --------------
97.51 --------------
598.850R 7,334.440R --------------
6,735.59
595.750R 2,239.570R --------------
1,643.82
728.220R 2,237.870R --------------
1,509.65
827.930R 4,513.31
5,341.24 ------ -------
598.560R
572.70
1,171.26 ------ -------
1,013.980R
593.990R
419.99 ------ -------
768.510R 1,111.590R --------------
343.08
Totals ____ $ 7,793.110R$ 7,793.110R -------------- ------ -------
61
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 10-Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON
WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JULY 1, 1930 TO JUNE 30, 1931
Districts
Distribution of Total of Allot-
ments on Mileage Basis
~
Funds As Actually Allotted
Allotment
Allotment
Distribution
Pro-Rated
Total
by Districts I by Districts I Allotments
Excess Allotment Allotment Under Over-Mileage Mileage Basis
Basi.s Distribution Distribution
No. L 23
4_
5 __ 6 __ 7
8~~ 9~~
10 __ 1L 12..
Totals
$ 1, 788,700.68$ 1,824,567.80 1,662,484.54 1,465,487.21 256,879.49 1,574,606.75 1, 566,471.56 1,914,790.80 2,176,945.93 1,573,840.18 2,666,169.79 2,020, 718.44
--
-- $ 20,491,163.171$
TOTAL ALLOTMENTS July 1, 1930 to June 30, 1931
2,000,004.05$ 1,822,118.30
950,026.32 727,967.98 537,003.01 720,671.37 1,129,384.40 1,876,176.47 1,968,341.36 1,936,062.68 3,048,244.43 2,289,037.63
19,005.038.00 $
129,725.83$ 132,327.10 120,571.98 106,284.71 18,593.97 114,198.63 113,608.62 138,870.53 157,883.38 114,143.03 193,364.43 146,552.96
1, 486, 125.17 $
2, 129,729.88$
341,029.20 ------------------
1,954,445.40
129,877.60 ------- .. ----
1,070,598.30
~
~
~
~
~
----------- $
591,886.24
834,252.69 - ~ -------- ----
631,234.52
555,596.98
299,217.49 ~
~
~
------------
834,870.00
~
~
~
--------------
739,736.75
1,242,993.02
~
~
~
------
323,478.54
2,015,047.00
100,256.20
~
~
~
- ~ -----
2,126,224.74 --------- .. ------
50,721.19
2,050,205.71
476,365.53 ---------- ----
3,241,608.86
575,439.07 ------ ---
2,435,590.59
414,872.15
~
20,491,163.17 ---- . - ~
-------
Schedule No. 10-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON
WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
SUMMARY ALLOTMENTS
JULY 1, 1930 TO JUNE 30, 1931
Distribution by Districts
Construction Maintenance __ _ Surveys ___ _
Emergency__ _
$ 16,551,385.83
2' l 75' 234. 75 286,210.53 7, 793.llCR
Total __ _
19,005,038.00
SUMMARY ALLOTMENTS
Pro-Rated by Districts
Undistributed Maintenance ___ Administration ___ _ Enforcement of M. V. Law_ Research and Analysis __ _ Quarry __ Shop ______ _ Equipment_ Convict Farm __
TotaL_____________________________
___ $
321.84CR
427,660.69
24,287.28
62l.OlCR
4,822.30
26,113.27CR
856,411.02
200,000.00
_'S==l==4=86=,=1=25=.=l::::.o~
OBJECT OF EXPENDITURES
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 11
SUMMARY OF EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
I ((SAcnhaelydsuilse)
((SAcnhaelydsuisle)
I No. 11-A)
No. 11-B)
Administration Construction
JULY 1, 1930 TO JUNE 30, 1931.
I I I ((SAcnhaelydsuisl)
((SAcnhaelydsuilse)
I Total
I II
Net Expense
MEMO Gross Expense
No. 11-C)
No. 11-D) Convict Farm Net Expense Disbursements Inter-Depart. Disbursements
Maintenance Equipment
Disbursements
Billings
Personal Services
$ 301,204.94$ 726,157.51$ 1,014,092.11 --
$ 2,041,454.56$ 2,041,454.56$ 141,026.63$ 2,182,481.19
Equipment Expenses-------
21.895.72 135,344.65 785,449.52 -
942,689.89 942,689.89
5,297.23 947,987.12
Equipment Purchase ____ _
- -----------
-$ 614,771.83
614,771.83 614,771.83-----------
614,771.83
Communication Services __
16,874.26
2,686.11
7,029.53
26,589.90 26,589.90
163.06 26,752.96
Heat, Light. Power and Water__ _
3,209.39
338.02
833.02
4,380.43
4,380.43
2,574.94
6,955.37
Rents __
6,056.33
2,153.38 35,331.53 --
43,541.24 43,541.24
101.00 43,642.24
Traveling Expenses ____ _
47,364.56 84,834.80 31,566.93
163,766.29 163,766.29
3,049.39 166,815.68
Supplies and Materials-_
15,639.34 687,647.98 268,033.29
971,320.61 971,320.61 120,692.63 1,092,013.24
Insurance_----
14,804.00
328.66 15,875.90 -
31,008.56 31,008.56
1,595.27 32,603.83
Printing,Binding,Publicity, etc.
2,640.59
58.77 -
2,699.36
2,699.36 -------
2,699.36
5[: Claims_ ----------Payments to Contractors_____ _
18,488.54 12,465,245.50
33,389.31 -
18,488.54
18,488.54 --------------
18,488.54
12,498,634.81 12.498,634.81 --
12,498,634.81
Special and Misc. Expenses_
10,421.95 94,068.04
2,195.61
106,685.60 106,685.60
1.378.60 108,064.20
Transfers __ ----------------
- $ 2,109.80
2,109.80
2,109.80----
2,109.80
-~~~~~
~~--~
-----~
~~~-~-
~~~--~~-
~--------1------ ~--~- -~~~~~
1$17' 468,141.42 $ 275,878.75 $17' 744,020.17
Total Administration~Exhibit
"C" __
____________________ $ 458,599.62
Total Construction~Exhibit "C" -
--- $14,198,863.42
Total Maintenance~Exhibit "C" __
-------------$2,193,796.75
Total Equipment--Exhibit "C" --- --
-- $ 614,771.83
Total Convict Farm~Exhibit "C" __ _
------------ - $~~2;;;,1""'09"'=.8=0
Total Expense Disbursements-- Exhibit "C"
--------------$17,468,141.42
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1930 TO JUNE 30, 1931.
Schedule No. 11-A
GENERAL ADMINISTRATION
RESEARCH AND ANALYSIS
Enforce of
Total
OBJECT OF EXPENDITURE
Inter-Depart.
Inter-Depart.
M. V. Law
Net Expense
General
Mental
Net General Research and Mental
Net
Quarry Disbursements
Administration Billings Administration Analysis
Billings
Research
-- ------------ -------------------1----11----1----- -------------
Personal Services_________________ $ 338,865.86$ 54,712.40$ 284, 153 .46 $ 19,691.43$ 18,282.56 $ 1, 408.87 $ 12,596.56$ 3,046.05$ 301.204.94
Equipment Expenses----
19,647.78 ------
19,647.78
1,883.89
1,444.49
439.40
1,086.32
722.22 21,895.72
Communication Services
16,838.89 --------------
16,838.89
48.16
48.16 --------------
4.90
30.47
16,874.26
Heat. Light. Power and Water__ _
8i Rents __
3,209.39 -------------5,956.33
3,209.39 5,956.33
160.17
160.17 -------------- -------------- -------------100.00
3,209.39 6, 056.33
Traveling Expenses
36,692.15- ------------
36,692.15
2,650.25
2,417.91
232.34
10.414.33
25.74
47,364.56
Supplies and Materials __
24.164.31
9,508.65
14,655.76
3,158.73
2. 906.47
252.26
57.75
673.57
15,639.34
Insurance ___ _
14,579.16 --------------
14,579.16
243.62
243.62
36.92
187.92
14,804.00
Printing,Binding,Publicity, etc.
2,640.59 -----
2,640.59 -------------- -------------- ------------
2. 640.59
Claims__
-------------
18,488.54 ----------
18,488.54
18.488.54
Special and Misc. Expenses_
10.300.57 --
10,300.57
342.38
294.38
48.00
70.50
2.88
10,421.95
----1-----1'------1----- ---------1-----1-----1------
TOTALS__________ ------------$ 491.383.57$ 64,220.95$ 427,162.62$ 28,178.63$ 25,797.76$ 2,380.87$ 24,267.28$ 4. 788.85
Total Administration Expense Disbursements-Exhibit "C"
----------- $ 458,599.62
Schedule No. 11-B.
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF CONSTRUCTION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1930 TO JUNE 30, 1931
-
Object of Expenditure
Surveys
Actual
Plans
------
Total
Construction Supervision Direct
Total
Total Expense Dis-
bursements
Personal Services_
$ 94,471.72
Equipment Expenses
5,609.70
Communication Services_
130.13
Heat, Light, Power and Water__
ll. 75
Rents _____ ------------- --- --Traveling Expenses ___ -----
6.00 36,419.75-
Supplies and Materials ___
3, 928.12
Insurance ________________ - -- -------
Printing, Binding, Publicity, etc. __________________
-----
48.30
Payment to Contractors ____ --
----
Special and Miscellaneous Ex-
p e n s e s _______
-- - --
30.3y
$ 59,110.57
94,471.72 $ 420,741.58$
5,609.70 24,593.14
130.13 1,219.18
ll. 75
68.31
6.00 1,030.26
36,419.75 47,078.83
3, 928.12 21,212.02
---
-----
---
210,944.21$ 105,141.81
1,336.80 257.96
1' 117.12 1,336.22 62,507.84
328.66
631,685.79$ 129,734.95
2,555.98 326.27
2,147.38 48,415.05 683,719.86
328.66
726,157.51 135,344.65
2,686.11 338.02
2,153.38 84,834.80 687,647.98
328.66
48.30
10.47
-- ------
10.47
58.77
4,557.50 12,460,688.00 12,465,245.50 12,465,245.50
59,140.96 31,405.25
3,521.83
34,927.08
94,068.04
Totals ________ ------ --$ 140,655.86$ 59,110.57$ 199,766.43$ 551 '916. 54$13,447' 180.45$13,999,096.99 ------------
Total Construction Expense Disbursements---Exhibit "C" _
--
--
----
-- - --- --- -$14,198,863.42
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF MAINTENANCE EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1,1930 TO JUNE 30, 1931.
Schedule No. 11-C
GENERAL MAINTENANCE
EMERGENCY
SHOP
Supervision
Direct
------1-----:-----------
Total
Total
Supervision Direct
Total
Shop
Inter-Departmental
Net Expense
Net
Disbursements
Billings
Shop
----- ----- - - - - ------ ---1-------
Persona1Services ________________ $ 61,047.10$ 925,072.21$ 986,119.31$ 1,151.51$26,821.29$27,972.80$68,031.67$68,031.67.
Equipment Expenses __
!2l Communication Services_
7,290.01 5,838.73
770,907.43 778,197.44
1,189.401
7,028.13
74.75 7,177.33 1.40 -----------
7,252.08 1.40
3,852.74 114.90
3,852.74 114.90-
Heat, Light, Power and Water
Rents___
______________ _
155.14 2,645.65
677.88 31,759.38
833.02 34,405.03
926.50
926.50
2, 414.77 10l.CO
2, 414.77 101.00
Supplies and Materials.
3,676.91 256,317.65 259,994.56
15.CO 8,023.73 8,038.73 108,277.61 108,277.61
Traveling Expenses_
16,703.55 14,619.59 31,323.14
184.50
59.2911
243.79
631.48
631.48
Insurance. ____ _
----
57.48 15,818.42 15,875.90-
--
1,351.65 ],351.65
Payments to 0 ontractors_ Special and Misc. Expenses
TOTALS_
1 I 88.14 ::~~;:~: ~:~~;:~:
i~:~~ 25 22 67 25 2
14.09 . 1. [
;:()8.1:22 -;:a84:22 ----- ---
1;~;-~; ;~~2~~,$-~~4~~~9 ;--],~4~~; ;-~8~~ ;--;;~0~ $-~;;;,0~~ ~~~ ---
- ---------
$ 1,014,092.11 785,449.52 7,029.53 833.02 35,331.53 268,033.29 31,566.93 15,875.90 33,389.31 2,195.61
Total Maintenance Expense Disbursements-Exhibit "0" ___ _
--$2,193,796.75
Schedule No. 11-D STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EQUIPMENT EXPENSE DISBURSEMENTS BY
OBJECT OF EXPENDITURE JULY 1, 1930 TO JUNE 30, 1931.
Adminis- Construe- Main-
tration
tion
tenance
Total
Land and Buildings ____ Automobiles ____________
$179' 115 .42 9,361.57
-----------$ $ 60,374.21
17,050.02$ 196,165.44 17,484.28 87,220.06
Trucks _________________ 1,470.00 35,059.69 54,366.78 90,896.47
Tractors ________________ ----------- 33,979.09
Road, Office
Machinery, Equipment
Other ______
----------18,033.25
35,604.63 50.00
31,546.34 65,525.43 79,532.84 115,137.47
327.94 18,411.19
Engineering Equipment 8,382.87 15,889.84
370.50 24,643.21
Shop Equipment _______ 1,880.00
65.00 4,166.33 6,111.33
Quarry Equipment _____ Laboratory Equipment_
----------10,661.23
---------------------
-----------------------
-----------10,661.23
Totals ______________ $228,904.34$181,022.46$ 204,845.03
Total Equipment Expense Disbursements-Exhibit "C" ___ $ 614,771.83
68
State Route No. 47, Between Columbia and Lincoln Counties- Bridge over Little River
1
Schedule No. 12 STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENSE DISBURSEMENTS BY CONGRESSIONAL
DISTRICTS JULY 1, 1930 TO JUNE 30, 1931
(Analysis) (Analysis) (Analysis) (Analysis)
Dis- (Schedule (Schedule (Schedule (Schedule
Total
tricts No. 13-B) No. 13-E) No. 13-C) No. 13-D)
Construction Emer- Surveys Maintenance
gency
-
No. 1 $ 850,428.55 $11,611.79 $13,538.95$ 191,523.97 $ 1,067,103 .26
2
931,357.55 695.46 15,423.88 186,384.62 1,133,861 .51
3
669,038.25 9,291.37 16,514.47 167,505.14 862,349 .23
4
522,776.94 1,272.65 14,720.79 139,464.88 678,235 .16
5
298,196.53 ---------- 3,334.14
34,196.28 335,726 .95
6
576,328.94 2,276.91 12,936.21 150,454.15
741,996 .21
7 1,173,669.63 3,763.37 21,256.70 195,683.14 1,394,372 .84
8 1,140,939.62 ---------- 20,336.61 9 2,475,589.08 1,139.77 18,424.84
185,242.50 1,346,518 .73 239,461.09 2,734,614 .78
10 1 '241' 284.46 27,051.09 18,660.25 131,355.47 1,418,351 .27
11 2,449,116.49 7,189.38 24,742.91 306,192.28 2,787,241 .06
12 1,670,370.95 5,379.27 19,876.68 196,662.17 1,892,289 .07
$13,999,096.99$69,671.06$199,766.43 $ 2,124,125.69
Total Expense Disbursements Distributed by Districts____ $16,392,660.17
Undistributed by Districts Administration General Office ____________ $ 326,327 02
Division Offices__________ 81,377.35 Warehouse_______________ 19,458.25
$ 427,162.62
Research ________________ _ Enforcement of M. V. Law Quarry __________________ _
2,380.87 24,267.28
4,788.85
Total Administration __ _ Land, Buildings and Equip-
ment __________________ _
Convict Farm, Transfers___ _
$ 458,599.62
614,771.83 2,109.80
Total Expense Disbursements Undistributed by Districts$ 1, 075,481.25
Total Expense Disbursements-Exhibit "C" ______ - _____ .$17 ,468,141.42
70
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENSE DISBURSEMENTS BY DIVISION UNITS
JULY 1, 1930 TO JUNE 30, 1931
Schedule No. 13
(Analysis)
Divisions
(Schedule
No. 13-B)
Construction
No. L __ - --$
2___ --3 ______ 4 ____
----
1'941' 831.47$ 3,254,690.36 2,124,406.72 2,700,021.15
5__ -----
1,984,294.13
6__ -------
1,993,853.16
Totals __ $ 13,999,096.99$
(Analysis) (Schedule No. 13-E) Emergency
3, 789.20$ 1,099.24 11' 138.65 30,389.11 4,724.57 18,530.29
--
69, 6'71 .06$
(Analysis)
(Analysis)
(Analysis)
(Schedule
(Schedule
(Schedule
No. 13-C) Surveys
No. 13-D)
No. 13-A)
Maintenance I Administration
36,382.09$ 30,142.15
287,118.521$ 391,198.21
12' 108.92$ 12,802.77
34,732.72
347,455.41
11 '712.96
38,596.78
319,360.57
14,188.77
38,866.42
416,908.23
14,099.72
21,046.27
362,084.75
16,464.21
199,766.43$ 2' 124' 125. 69 $
81,377.35
Total
2,281,230.20 3,689,932.73 2,529,446.46 3,102,556.38 2,458,893.07 2,411,978.68
Total Expense Disbursements Distributed by Divisions __
Undistributed by Divisions
Administration
General Office___ _
_$
Warehouse________ .. _________ ..
326,327.02 19,458.25$
$ 16,474,037.5:; 345,785.27
Research ____ .. ______________ _
Enforcement of M. v. Law ___ _
Quarry _____________________ _
2,380.87 24,267.28 4,788.85
Total Administration Land, Buildings and Equipment__ Convict Farm, Transfers _______ _
377,222.27 614,771.83
2,109.80
Total Expense Disbursements Undistributed by Divisions ___ _ Total Expense Disbursements-Exhibit "0" ___ ____________ _
- $
994,103.90
------
$ 17,468,141.42
Schedule No. 13-A
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS BY UNITS
JULY 1, 1930 TO JUNE 30, 1931.
Heat,
Special
Communi- Light,
Supplies
Printing,
and
Personal Equipment cation
Power
Rents Traveling and Insurance Binding, Claims Miscel-
Totll
Services Expenses Services and
Expenses Materials
Publicity,
laneous
GENERAL OFFICE
I
Water
I
Etc.
Expenses
Commissioners_______ --.$ 24,527.19$2,575.71$ 875.99$ 16.00 __________ $ 8,506.60i$ 496.531'$ 7.69
General Engineering_____ __ 34,180.22 3,001.02 ________
_______ __________ 7,358.54.__ ___ __ _ __ __ ______
__________ $ 142.21$ 37,147.92 44,539.78
Plans for Roadways______
65,084.26 339.67
___ __________ 640.911--
1,896.08 67,960.92
Plans for Bridges___
19,265.03 888.19
1,803.08 __
38.50 21.994.80
Asphalt Department______
8,450.16 570.44 __________ __
1,220.431---------- 108.59
___ $ 778.20
ll,127.82
Accounting Department_.__ 64,027.76 757.09 --------- ______ ___ _________ 4,210.05'-_________
__________ ______
68,994.90
Purchasing Department___ 18,230.00 725.69 __________ ____ _ __________ 626.94 __________
19,582.63
Maintenance Department__ 14,875.00 2,790.53
3.50 __
_ __________ 4,504.29
2.70 610.28 ____________ 9,262.08 1.027.66 33,076.04
Undistributed_______________ 23,189.44 3,020.84 9,664.44 2,906.63$ 3,088.61 554.27 16,920.63 9,507.68$ 2,607.64 7,822.66 6,840.82 86,123.16
~- - - - - - - - - - - - - 1
---------
TOTALS-. ----------- ---- $ 271,829.06 $14,668.68 $10,543.93 $2,922.63 $ 3, 088.61 $29,425.11 $17,419.86 $10,234.24 $ 2, 607.64 $17, 862.94 $ 9, 945.27 $ 390,547.97
Less: Blue Print Billings__ 54,112.40---
_____ __________
9,508.55 __________ __
__________ __________ 64,220.95
TOTALS________ -.----- ___ $ 217 ,l16 .66 $14,668.68 $10,543.93 $ 2, 922.63 $ 3,088.61 $29,425 .ll $ 7, 911.31 $10,234.24 $ 2, 607.64 $17,862.94 $ 9, 945.27 $ 326,327.02
1----11---------- -------------------------------
WAREHOUSE_ ___________ ------- $ 15,131.88 $ 1,604.79$ 22.23 $ 90.91
-- $ 621.85 $ 402.78 $ I. 378.34 ------------ $ 55.00 $ 150.47 $ 19,458.25
---- ---- - - - ---- ----- ---- ------ ----- ---- - - - - - - -
DIVISIONS No One ___________________ - $ 8,076.23 $ 546.49 $ 842.83 $ 57.33 $ 415.00$ 892.33 $ 6ll.81 $ 607.55 $
15.89$ 32.00 $ 11.46 $ 12,108.92
No. TWO------ -----------
8, 727.50 595.10 801.65 48.50 418.20 950.68 647.12 552.96
57.10
3.96 12,802.77
No. Three __ ---------------No. Four. ___________________
No. Five ___
-----------
7,500.00 9, 226.44 8, 683.00
550.45 1,105.87 498.83 1,175.93 588.59 1,153.98
9.00 47.52 17.00
300.00 962.11' 866.33 424.52 1,244.211 1' 090.80 560.00 1,135.38 889.40
375.20 477.02 471.47
44.00 ll, 712.96
3.50
14,188.77
5.92 478.00 116.98 14,099.72
No. Six._ ...
------------ 9, 691.75 594.85 1,192.47 16.50 750.00 1, 460.48 2,236.21 482.38
11.14
28.43 16,464.21
TOTALS.-----------------$ 51,904.92$ 3,374.31$ 6,272.73$ 195.85$2,867.72$6,645.19$6,341.671$2,966.58$
32.95 $ 570.60 $ 204.83 $ 81,377.35
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS BY UNITS
JULY 1, 1930 TO JUNE 30, 1931.
Schedule No. 13-A- -Cont'd.
Personal Services
CommuniEquipment cation Expenses Services
Heat, Light, Power and Water
Rents
Supplies Traveling and Insurance Expenses Materials
Printing, Binding, Publicity,
Etc.
Claims
Special and
Miscellaneous Expenses
Total
TOTAL GENERAL Administration ___ _
_ $ 284, 153 .46 $19, 647.78 _$_1=6_._8=38==89 __$_3__,_2=C9==39 $==5_._9=56==33 $=3=6=6,=92==15 $=1=4_._6=55==76 $=1=4_._5=79=._1_6 -=$=2=,=64=0=5.=9l$=1=8=4,=88==54 $10, 300.57 $ 427, 162.62
1
RESEARCH AND ANALYSIS
Division of Tests ___________ $ 18,282.56$ 1,444.49$ 48.16$ 160.17 __________ $2,417.91$2,906.47$ 243.62 __
_$ 294.38$ 25,797.76
Division of Research
1,408_87 439.40 ------- -- ---------- ---------
232.34 252.26 ---
1~--- ----~-- - - - - - - - - - - - - - - - - - - -
48.00 2, 380.87
TOTALS __________________ $ 19,691.43$ 1,883.89$ 48.16 $ 160.17 ------- - $ 2,650.25$ 3,158.73$ 243.62 --
$ 342.38 $ 28,178.63
Less: Test Billings_
18,282.56 1,444.49
48.16 160.17-
2,417.91 2,906.47 243.62-
294.38 25, 797.76
1~---1~-- - - - - - - - - - - - - - - - - - - -----1---~ - - - - - - - - - - - - - - -
TOTALS___________________ $ 1,408.87$ 439.40 __________ ---------- ---------- $ 232.34$ 252.26
---------- $ 48.00$ 2,380.87
1----1~-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
ENFORCEMEI'<T OF M. V. LAW__ $ 12,596.56$ 1,086.32$ 4.90 ---------- --------- $10,414.33$ 57.75$ 36.92-
_$ 70.50$ 24,267.28
QUARRY _________ _
3, 046.05 $ 722.22 $ 30.47 ---------- $ 1GO.OO$ 25.74 $ 673.57 $ 187.92 __
2.88 $ 4,788.85
TOTAL ADMINISTRATION ________ $ 301,204.94$21,895.72$16,874.261$ 3,209.39$ 6,056.33$47,364.56$15,639.34$14,804.00$ 2,640.59 $18,488.54 $10,42l.95 $ 458,599.62
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 13-B
ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS, BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Personal Services
Equipment Expenses
Communica- Heat, !Jght,
tion
Power and
Services
Water
Rents
Supplies Traveling and Expenses Materials
lnsur-
a nee
Printing, Binding, Publicity,
Etc.
CONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS
Payments to Contractors
--
Special and Miscellaneous Expenses
Total
District No.
~
""'
L .. ___ $
2------3 ____ -4 _______
5.-----
6__ ____
25,479.26$ 32,624.15 19,942.06 15,888.51 !l,805.17 14,864.41
1,853.76$ I, 631.04 I, 148.46
973.44 571.22 1.495.95
160.70$
3.60 - -------- $ 3,699.97 $ 1,436.42
60.26 ---- ---- $ 58.00 2, 981.01 1.635.49 ---
69.10 -------------
3,011.66 775.23
25.05 -
1,942.78 879.40
22.13 --------
27.50 994.75 620.30
23.22 -
32.00 2,651.13 493.97
7 ______
8.----9.10.----IL .... 12------
45,828.67 36,097.14 66,468.67 35,970.29 80,163.58 35,609.67
2, 621.96 I, 3ll. 76 3,168.47 2,544.72 5,073.57 2,198.79
27.13 81.26 150.32 123.70 417.08 59.23 -
376.10 4,686.59 1,862.ll18.00 3, 488.86 1,386.19190.25 5, 592.44 2, 367.47 72.38 4, 388.28 2,254.7664.71 103.37 9,913.97 4, 910.63 - -- $ 152.66 3,727.39 2, 590.05
Totals ____________ $ 420,741.58$ 24,593.14$ 1.219.18$
68.31$ 1,030.26$47,078.83$21,212.02 ------ $
--------------- $ 4,532.50
2,269.35$ 3, 437.08 I. 236.43 1,362.16
675.79 1,223.26
34,903.06 42,427.03 26,182.94 21.071.34 14,716.86 25,316.44
10.47
25.00
2,654.42 2, 519.66 4, 471.23 2,769.29 5, 610.42 3,176.16
58,056.98 44,902.87 82,433.85 48, 123.42 106,267.80 47,513.95
4,557.50$ 31,405.25$ 551.916.54
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 13-B Cont'd.
ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS, BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Personal Services
Comnrunica- Heat, Light,
Equipment
tion
Power and
Expenses Servii:es
Water
Rents
Stpplies Traveling and lnsurExpenses Materials anee
Printing, Binding, Publicity,
Etc.
Payments to ContrJctors
Special and Miscellaneous Expenses
CONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS
To!ll
District No. ----- $ ll,037.ll $ 1,920.18--
"'l
178.00
606.70
01
12,342.55 10,421.71 $
2, 696.6G
60.00-
5 ..
3, 949.60 1, 908.70
6
15,343.06 5,882.67
---$
-------------
ll5.61 -
9.78 45.23
243.87 $ 13.0C 2.50
369.01 $ 6,096.45588.51 -
142.36 28,942.74130.09
19.29 17,302.28-34.45 49,686.97-
- - $ 795,858.87 ---
- $ 815,525.49
887,557.31 -
888,930.52
590, 278.14 $ 599.21 642,855.31
498,818.91 -----------
501,705.60
26G, 193.32
91.2C 283.479.67
480,019.22
.90 551, C12.60
8 9 10 .. ----
))__ ____
12.--- -
36,695.98
65, 275.03 3, 728.41 20,582.69 39, ll5 .18
16,020.88 21.78
43,068.07 415.84
10,772.16 14,043.12
~------
TOTALS _________ $ 210,944.21 $ 105,141.81 $
396.96$ 425.64 142.75 200.83 1,336.80$
33.42 224.83 178.96 166,768.94 $ 164.33-
893,827.07 1, 301.28 1,ll5,612.65
98.72
42G.OO
41.43 505.58 224,773.17 ll7 .25
1,095,973.54 ----------- 1,093,036.75
2,058,045.19
426.58 2, 393, 155.23
34.31
1, 188,982.48
1, 193,161.04
61.42 129.50
32.08 70,580.22 47.08
2,239,958.34
542.45 2,342,848.69
64.40
83.42
54.50 97,562.73.
1,471,172.61
560.21 1, 622,857 .GO
- - - - - - - -
----
------- ----- ---------- -------- --------
257.96 $ 1,ll7.12 $ 1, 336.22 662,507.84 $ 328.66 -- --- --- i$12,460,688.00 $ 3, 521.83 $13,447,180.45
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 13-B--Cont"d.
ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS, BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Personal Services
Equipment Expenses
Communica- Heat, LiGht.
tion
Power and
Services
Water
Rents
Supplies Traveling and Expenses Materials
lnsura nee
Printing, Binding, Publicity,
Etc.
CONSTRUCTION SUPERVISION BY DIVISION UNITS
Payments to Contractors
Special and Miscellaneous Expenses
Total
Division No. L .... $ 65,509.22$ 3,714.93$
34.81 ... ...... $ 489.85 $ 6,503.83 $ 2,809.14
.... $ 4,070.03$ 83,131.81
...,
2.
99,324.27 4. 300.82
249.02 ..
3 .
46.755.61 3, 455.91
68.80 ...
122.00 8, 856.23 3. 536.45 98.00 6,495.75 l. 704.87
... $
----- -----------
25.00 4,532.50
6, 508.07 3,932.98
122,921.86 67, 044.42
Cl
73.905.72 5, 204.15
216.76 ...
159.04 9, 552.28 5. 052.88
6,690.44 100,781.27
5..
65,528.17 3,488.85
193.89 ------
107.50 7,565.83 2,854.22
5. 9ll.31
85,649.77
6
69,718.59 4, 428.48
455.90 $
68.31
53.87 8,104.91 5, 254.46
. $
10.47 -----
4,292.42 92.387.41
-1----1-- -----1-----1------- - - - - - -- ----------------------
TOTALS ........ $ 420,7~1.58 $ 24,593.14$ 1,219.18$
68.31$ 1,030.26$47.078.83$21,212.02 ........ $
10.47 $ 4,557.50$ 31,405.25$ 551,916.54
CONSTRUCTION DIFECT BY DIVISION UNITS.
Division No. L .. .. $ 81,376.80 $ 44.394.55 $ 689.15$ 132.14$ 530.33 $ 269.74 327.969.77 $ 281.58 .. --------- $ 1.401. 752.22 $ 1. 303.38 $ 1, 858.699.66
2 3.. .. 4 . 5.. 6
24,543.81 16,623.98
143.23 ------------ 117.00 434.09 80,916.05 -----
3,008,473.76
516.58 3,131, 768.50
52.710.36 18,825.07
246.06
64.40
83.42
88.95 146,695.34 -------- ------------ l. 838. 088 .49
560.21 2,057,362.30
7,025.91 1,295.52 .. ----------- --------- ---------- ---------- 656.43 -------- ----------- 2,590.262.02 ..
2. 599,239.88
21,3ll.79 17,064.88
221.80
61.42 135.50 155.76 75.163.71 47.08 ------------ l. 783.340.76 1,141.66 1, 898,644.36
23.975.54 6, 937.81
36.56 ...
250.87 387.68 31,106.54 -------- ------------ 1,838,770.75 ------------ 1, 901.465.75
----l---------1-----------------------l----+---------
TOTALS ..
$ 210.941.21$ 1(5,141.81 $ 1,336.80$ 257.96$ 1,117.12$ 1,336.22 662,507.84$ 328.66
.. $12,460.688.00$ 3,521.83$13,447,180.45
Proj. 382, Stephens County- Concrete (Note visibility). 77
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS, BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Schedule No. 13-C
Personal Services
Equipment Expenses
Communica- Heat, Light,
tion
Power and
Services
Water
Rents
Supplies Trav<ling and Expenses Materials
lnsur .. a nee
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
SURVEYS ACTUAL BY CONGRESSIONAL DISTRICTS.
Tot I
-1 District No.
00
L. - $ 2 3 L
5,473.851$ 7,455.28 9,203.92 7,948.18
683.83 6,879.22
199.31 $ 267.75 480.54 477.31 22.59 194.97
7-s__ g ___
10 1L 12
12,706.21 6, 505.22 10,265.83 7,120.85 12,894.35 7, 334.98
I
TOTALS ____ ___ 1$ 94,471.72$
936.96 727.64 384.70 405.79 909.09 603.05
5,609.70$
5.27 -7.40 6.10 -10.31 --
6.03 ---
--- -------- - $ 1,336.28$ 2, 819.81 3, 340.24 3,049.04 363.30 1,974.20
250.18 226.16 391.83 456.29 33.51 ---267.16
------------- --------
$
9.90
$ 7,264.89 10,776.40 13,432.53 11, 941.13 1,103.23 9.321.58
24.87 -
4, 876.43 664.47-
-$
25.00
19,233.94
3.45
---- $ 6.00 2, 588.73 156.34
9,987.38
6.35
3,043.78 363.97
.66
14,065.29
11.27 -
3, 820.58 196.05
2.56
11,557.10
30.87 $
11.75
6,029.00 660.53
24.40 -
1.39
20,561.38
18.21 -
3,178.36 261.63
11.00
.78
11,411.01
- - - - - - - - - - - - - - - - - - --~---
- - - - - - - - - - - - - - ~--------
I
130.13 $
11.751$ 6.00 $36,419 '75 $ 3,928.12
48.30 -----
-- $
30.39$ 140,655.86
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 13-C~Cont'd.
ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Personal Services
Communica- Heat, Light,
Equipment
lion
Power and
Expenses Services
Water
Rents
Supplies Traveling and lnsurExpenses Materials anee
Printing, Binding, Publicity,
Etc.
Payments to Contractors
SU.'lVEVS PLANS BY CONG!'lESSIONAL DIST,liCTS
Special and Miscel-
laneous Expenses
Total
District No. 1----2
5. 6------- -
7------8---g __ 10 ---1112 . .
TOTALS _______ _
6,274.06$ 4, 647.48 3,081.94 2,779.66 2,230.91 3,614.63
6,274.06 4, 647.48 3,081.94 2, 779.66 2,230.91 3,614.63
2,022.76 10,349.23 4, 359.55 7,103.15 4,181.53 8,465.67
2,022.76 10,349.23 4,359.55 7.103.15 4,181.53 8, 465.67
- $ 59,110.57$ 59,110.57
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 13-C-Cont"d.
ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Personal Services
Communica- Heat, Light,
Equipment
tion
Power and
Expenses Services
Water
Rents
Supplies
Traveling and
lnsur-
Expenses Materials anee
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total
SURVEYS ACTUAL BY DIVISION UNITS.
Division No. L
2
00 0
3----
L
5
6--
$ 21,160.99$ 10,928.33 18,378.17 13.601.28 21.362.44 9,040.51
--~~:~~1$ 1,382.60$
33.22 ----
-- $ 7,217.03$ 1,068.47
799.77
4.05
- $ 6.00 4,342.48 300.30
880.45
14.34
6,610.35 735.45-
613.14
18.04
5,321.08 451.32 -
1, 363.81
46.28 $
11.75
8, 572.25 931.50
---
569.93
14.20 ----
- ---------- 4,356.56 441.08 -----
- - - - - 1 - - - - 1 -~-- ~--- - - - - ~
$
9.90
38.40
- - - - - - -~
-- $
30,887.97
16,383.11
26,618.76
1.16 20,006.02
32,297.93
1.39 14,462.07
---~. - - - - - - 1 - - - - - -
~--- ~---
TOTALS.- - ---- $ 94,471.72 $ 5,609.70$ 130.13$
11.75 $ 6.00$36,419.75$3,928.12--- --$
48.30 ------- ---- $
30.39 $ 140,655.86
SURVEYS PLANS BY DIVISION UNITS
Division No. L 2
5. 6 TOTALS
--- $ 5,494.12$ 13,759.04 8,113.96 18,590.76 6, 568.49 6, 584.20
5,494.12 13,759.04 8,113.96 18,590.76 6,568.49 6, 584.20
$ 59,110.57 $ 59.110.57
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 13-D
ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Personal Serv'ices
Equipment Expenses
Communica- Heat, Light,
tion
Power and
Services
Water
Rents
Supplies Traveling and Expenses Materials
lnsurance
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous
Expenses
MAINTENANCE SUPERVISION BY CONGRESSIONAL DISTRICTS.
Total
District No. ______ $
i!i
3
4 ---
5 -
6 --
5,229.73$ 5,158.08 4,613.82 4,326.62 1,117.35 4,436.57
678.67 $ 603.10 617.27 707.94 89.92 733.10
592.97 $ 400.47 ----408.22 473.24 77.93 506.10
10.52 $
9.64 6.50 3.81
238.83 $ 1,064.88$ 221.50 1,660.CO 181.82 1, 491.42 142.33 1, 348.74 45.20 314.30 138.41 1,418.23
490.06 $ 4.59195.89 19.06 -----129.30 12.39 207.32 50.57 167.78 ---------
--- $
3.56$ 74.80
8,313.81 8,258.10 7,454.24 7. 215.83 1,701.77 7,478.80
7 8910 __ 1L--12
TOTALS_
6, 560.85
447.71
466.44
72.35 287.20 1,686.17 311.67
------- -----
9.832.39
5, 048.43
489.30
435.52
2.08 263.33 1,576.03 370.62 --------
8,185.31
6,361.55
533.46
521.27
19.91 319.36 1,917.57 360.04 --
------- ----
.94
10,034.10
4,412.61
472.96
422.76
17.51 201.66 1,018.42 574.49 --------
7,120.41
7,992.21 1,161.99
899.53 ------------ 361.33 1,811.80 387.92 17.97
7.19
12,639.94
5,789.28
754.59
634.28
12.82 244.68 1,395.99 431.25 3.47
1.65
9, 268.01
----- ----------------------- ---------------------
$ 61,047.10$ 7,290.01$ 5,838.73$ 155.14$ 2,645.65 $16,7G3.55 $3,676.91$ 57.48 ______ _
88.14$ 97,502.71
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 13-D Conl'd.
ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930. TO JUNE 30. 1931.
Personal Services
Communica- Heat. Light.
Equipment
tion
Power and
Expenses Services
Water
Rents
Supplies Traveling and lnsurExpenses Materials anee
Printing. Binding, Publicity.
Etc.
MII:I!TE'IANCE Dl ECT BY CONG';ESSI::JNAL DISTRICTS.
Payments to Contractors
Special and Miscellaneous Expenses
Total
District No. L
2...
00
""
3.. L
5...
6....
$ 88,977.91 $ 70,534.08 $ 85,488.10 71, C41.15 75,927.79 66,457.73 57,201.86 55,545.93 16,583.73 12,030.01 68,218.76 56,336.41
97.24 $ 78.87 46.63 65.35 14.00 70.83
39.69 $ 363.18 $ 1,093.82 $20,238.90 1,739.53. 63.42 380.01 1,012.29 17,359.43 1,524.58 27.83 497.01 1,132.38 14' 461.13 1,325.24 37.41 2, 715.04 1,479.12 13,936.38 I, 103.74 . 24.83 234.97 280.05 3,117.84 176.73. 44.46 591.84 I, 583.14 14,818.62 I, 189.51 .
. ... $
125.81 $ 148.67 175.16 164.22 32.35 121.78
183,210.16 178,126.52 160,050.90 132,249.05 32.494.51 142,975.35
7. - 76,604.72 61,854.17
79.58
81.11 955.50 1,710.24 42,987.111,129.94.
448.38 185,850.75
8...... 77,796.50 64,078.55
111.44
75.07 16,548.42 1,026.28 13,776.70 1,13J.07.
. ... $ 2,362.29
151.87 177,057.19
9...... 112,004.84 70,719.07
121.92
79.49 5,609.85 1,386.88 35,976.851,292.69.
1,976.90
258.50 229,426.99
10....... 55,302.53 46,967.81 IL ... 132,335.09 106,155.42
87.20 320.80
68.55 2,671.12 974.47 16,722.281,314.00. 65.98 651.35 1,583.82 46,205.142,212.24.
I
3,828.45
127.10 124,235.06 194.05 293,552.34
12.. _ _'7'/,~().~ -~!),~8'/,:0 ___!)!i_:~ ___'70.04 --~~-~ _1,32'7.:0 16,717.27 ~~().~ :_:___:_::_:1_ ------ ---~~~ --~'1.::~~
TOTALS ......... $ 925,072.21 $ 770, 907.43 $ 1,189.40 $ 677.88 $31,759.38 $14,619.59 256,317.65 15,818.42 .. . .. .. . $ 8, 167.64 $ 2, 093.38 $ 2, 026,622.98
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 13-D-Cont'd.
ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Personal Services
Communica- Heat, Light,
Equipment
tion
Power and
Expenses Services
Water
Rents
Supplies
Traveling
and
Expenses Materials
lnsura nee
Printing, Binding, Publicity,
Etc.
MAINTE'lANCE SUPE WI310N BY DIVISION UlloiTS.
Payments to Contractors
Special and Miscellaneous Expenses
Total
Division No. L
2--
0w 0
3
5 __
10,355.00$ 9,820.00 9,952.10 9,955.00 11,200.00 9, 765.00
698.54$ 927.97 1,787.38 1,046.91 1,310.49 1, 518.72
728.33$ 112.21 $
844.24 .
1,194. 76 -
959.76
42.93
869.65 -----------
1,241.99-
446.25 $ 2, 648.32 $ 488.60 518 .4G 3,158.60 605.87 300.00 3,240.68 439.80 450.00 2, 218.02 1,138.70 481.00 3,613.7G 347.74$ 45G.OO l, 824.23 656.20
41.40 16.08
TOTALS. ---$ G1,047.1C 7.290.01$ 5,838.73$ 155.14$ 2,645.65$16,703.55$ 3,676.91$ 57.48
MAINTENANCE DIRECT BY DIVISION UNITS.
- -$
--- --------------
-$ .94 74.80
12.40
15,477.25 15,876.02 16,989.52 15,811.32 17,863.98 15,484.62
88.14$ 97,502.71
Divi>ionNo. L __ $119,381.77$ 90,454.14$
2 _
175,142.8C 124,098.70
3
144,619.39 141,898.09
L
136.183.24 130,359.14
5.. --- 191,870.82 154,535.31
6- --- 157,874.19 129,552.05
133.98$ 221.41 132.80 190.68 13g,33 371.70
135.08 $ 1, 471.81 $ 2, 646.63 $55,068.13 1,755.24150.48 22,052.76 2,050.67 44,820.41 2,ll2.59 --89.89 3, 470.42 3,622.33 33,573.41 2,747.79123.96 2, 236.76 2,155.09 28,000.80 3,034.8796.77 885.13 2.263.34 45,592.31 3, 298.55 81.70 '12.50 1, 881.53 49,262.59 2,869.38 ---
----- ----- $ - - -- $ 4,339.19
------------------------
------ ---------3,828.45
594.49 $ 333.18 3ll. 77 264.71 363.19 226.04
271,641.27 375,322.19 330,465.89 303.549.25 399,044.25 346,600.13
TOTALS---- -- _ ;-~~;;;~;1 ;-;;0~~~~~ $-~~~~ ;---;~;~;31, 7~~ ~~~; ;;~~~~~ ;;,~;~ ~----- ;----~~~~ -$-~ ;-~~~~~;
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EMERGENCY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Schedule No. 13-E
Personal Services
Equipment Expenses
Communica- Heat, Light,
tion
Power and
Services
Water
Rents
Supplies
Traveling
and
Expenses Materials
lnsura nee
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
EMERGENCY SUPERVISION BY CONGRESSIONAL DISTRICTS.
Total
Diotrict No.
-$
2 -
46.6R $
1.40
4 5.. 6_
7 --8.
9 lO 1L 12-.
300.00 103.61
TOTALS.. -- $ l,l51.51 $
27.07 1.00 -
74.75 $
86.43-
55.50 $ 15.0041.57 -
15.00 -
- ---------- - $
882.41
14.09
412.66 146.18
-$
14.09 $ l. 441.25
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 13-E -Cont'd.
ANALYSIS OF EMERGENCY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Personal Services
Communica- Heat, Light,
Equipment
lion
Power and
Expenses Services
Water
Rents
Supplies
Traveling and
lnsur-
Expenses Materials anee
Printing, Binding, Publicity,
Etc.
EMERGEI\oCY DIRECT BY CONGRESSIONAL DISTRICTS.
Payments to Contractors
Special and Miscellaneous Expenses
Total
District No. L
2
00 01
L
L
5_
6
$ I. 940.251$ 364.43 ..
631.46
6,842.45 1. 976.31 .. _
37.25
22.00-
------------
560.13
37.28
... $ 1,027.80 ........ 64.00 .. 472.61 ...... 18.97 -----
7
1,261.74
97.57 ---
2,404.06 ---
8.
73.50
76.58-
- $ 926.50
63.19 ----
10 -
10.526.33 2,672.43 --
----- $ 59.29 3,267.23 ---
1L
2,092.81
22.15 ----------- --------- ---------- ---------
90.55 ----
12.-
2. 855.37 1.908.58 --- ---- ---------
----- ---------- 615.32 ---
TOTALS _______ $ 26,821.29$
- - ---------- $ 926.5C $ 59.29$ 8,023.73 --
----- $
7,396.90 ------------ $ 1,194.43 ------------
10,729.38 695.46
9, 291.37 l. 272.65
1, 679.50
2, 276.91
3,763.37
10,113.15 4. 837.69
1,139.77 26,638.43
7,043.20 5,379.27
25,221.67
68.229.81
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 13-E-Cont'd.
ANALYSIS OF EMERGENCY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1930, TO JUNE 30, 1931.
Personal Services
Comrnunica- Heat, Light,
Equipment
tion
Power and
Expenses Services
Water
Rents
Supplies Traveling and Expenses Materials
lnsura nee
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscel-
laneous Expenses
EMERGENCY SUPERVISION BY DIVISIOIII UNITS.
Total
Division No. L-
2 -
3 --
4--- --- $ 385.00 $
35.62-
117.95$ 15.00 -------- -----------
14.09 $
567.66
5---6_
----~~~~ ~---- 39:~ ~-~~~~~ ~~~~~~ ~~~~~ ~~i6:55 ~~~:::: ~~~~ ~~~~~~~ ~- ~~~~~~~~~~~~ ~~~~~~~
TOTALS
- $ 1.151.51$
74.75$
1.40 --- -- - --- ------ - $ 181.50$ 15.00 --- ---------- -- - --------- $
14.09$ 1,441.25
EMERGEIIoCY DFECr BY DIVISI:JN UNITS.
Division No. L--
1,261.74$ 138.10-
2 -
73.50
36.05
3------
5,771.59 2, 001.55-
4 5 -
;-:-::; :-:-:-: =~
TOTALS_
- ------------
926.50
=c ~ ~~~~;
----$2,389.3663.19491.58 -
-:-~~. ::--: -$
- $ 2, 873.93 11,199.43-
11,148.31 ___ _
- $ 3, 789.20 1, 099.24 11,138.65 29.821.45 4.724.57 17,656.70
------ ---- $ 2.'\.221.67. -------- $ 68.229.81
Route No. 8 between Athena and Royston- Old Coverod Bridge
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1,1930 TO JUNE 30,1931.
Schedule No. 14
OBJECT OF EXPENDITURE
ADMINISTRATION
I I General Research Enforce
I Administra- and o!M. V. Quarry
tion
Analysis Law
CONSTRUCTION
MAINTENANCE
I I General Emergency
Construction! Surveys Maintenance Mainte- Shop nance
Land, Buildings
and Equipment
Total Expendi
tures
PERSONAL SERVICES
G. 0. Administration
Administrative___________ ------ $ 84,714.21 ---------- ---------- ---------- ------------ ---------- -----------Others __________________________ _ 191,006.54 ---------- ---------- ---------- ------------ ---------- ------------
----------------------$ 84,714.21 --------------------- 191,006.54
Field Office Administration
Administrative.. ______ ----------
00 00
Others. ___ -----------------------
Research and Analysis
23,255.00---------- ---------- ---------- ------------ ---------- -----------28,649.92 ---------- ---------- ---------- ------------ ---------- ------------
23,255.00 28,649.92
Administrative __________________ -------------- $ 3,250.00 ---------- ---------- ------------ ---------- ------------
3, 250.00
Others ___________________________ -------------- 14,962.56 ---------- ---------- ------------ ---------- ------------
14,962.56
Crack Survey____________________ -------------- 1,478.87 ---------- ---------- ------------ ---------- ------------
l, 478.87
G. 0. Shop
Administrative__________________ -------------- ---------- ---------- ---------- ------------ ---------- ------------ ---------- $ 2, 750.00 -----------
2, 750.00
Others ___________________________ --------------
---------- ---------- ------------ ------- ------------
6,951.45 ------------ 6, 951.45
Direct Shop _____________________ ----------------------------
---------- 58,330.22 --------
58,330.22
Supervision
Direct Supervision ____________________________ ---------- ____ ----- ---------- $ 420,741.58
_ $ 46,626.77 $ 1,151.51 ---------- ------------ 468,519.86
Others _________________________________________ ---------- __________ ---------- ------------ ---------- 14,420.33
_____________________ _ 14,420.33
Direct Costs
Survey Parties___________________ -------------- ---------- ---------- ---------- ------------ $94,471.72 ------------
94,471.72
Maintenance Patrolmen________ ------------------------------------------------------------------ 207,456.22
207,456.22
Const. and Emerg. Foremen ___ -------------- ----------- -------- ---------- 54,144.11 ---------- ------------ 6,563.66 ---------- ------------ 60,707 0 77
EQuipment Operators __________ -------------------------------------------- 59,311.44---------- 214,120.47 6,421.60 ---------- ------------ 279,853.51
Shop Employees Field---------- ______________ ------------------------------ 5,088.00 ---------- 41,664.21
46,752.21
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1930 TO JUNE 30, 1931.
Schedule 1\o. 14-Cont'd.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF EXPENDITURE
I I General Research Enforce
I Administra- and ofM.V. Quarry
tlon
Analysis Law
I I General Emergency
Construction' Surveys Maintenance Mainte- Shop nance
Land, Buildings
and Equipment
Total Expendi-
tures
Direct Costs-Cont'd. Sign Em:t>loyees__
______ -------------- ---------- _________________________________________ $ 15,431.66 _____________________________ _ $ 15,431.66
Other Skilled Labor____________ -------------- __________ ---------- __________ $ 23,910.62 __________ 14,419.65$ 220.38 __________ ------------ 38,550.65 Common Labor_________________ -------------- __________ ----------__________ 68,490.04 __________ 431,980.00 13,615.65 _____________________ _ 514,085.69
Quarry
A!dministrative __________________ -------------- ---------- ---------- $ 1,835.00 ------------ ---------- ------------ ---------- ---------- ------------ 1, 835.00
Others___________________________ --------------------------------- 370.80 ------------ __________ ------------ ---------- ---------- -----------~ Direct QuarrY------------------- ________________________ ---------- 840.25 ______________________ ------------ ____________________ ------------
370.80 840.25
Enforce. of M. V. Law ____________ -------------- __________ $12,596.56---------- ------------ __________________________________________ ------------ 12,596.56
Professional Fees _________________ $ 11,240.19 ---------- ---------- ---------- ------------ ---------- ------------ __________ ---------- ------------ 11,240.19
-~~~~----~~---1----1---~ ----~ -~~~--~--~ -~---
TOTALS ____ _
--------- $ 338,865.86 $19,691.43 $12,596.56 $ 3,046.05 $ 631,685.79 $94,471.72 $ 986,119.31 $27,972.80 $68,031.67 ------------ $2.182.481.19
EQUIPMENT EXPENSES Automobile Maintenance Tires and Tubes__________ _ $ Accessories. Parts and Repairs_ Greasing, Washing, Storage __ _ Road Equipment Expenses
Gas and Oil--------------------Tires and Tubes _____________ _
Accesories Parts and Repairs__ _ Miscellaneous Charges _______ _ Repairs to Office Equip, ________ _ Re:t>alrs to Engineering Equip. __
3, 619.12 $ 97.64 $ 178.25 ---------- $ 5,320.43$ 1,039.93$ 3, 338.54 $ 9,118.70 518.00 658.69 ---------- 13,357.55 3, 485.73 5, 435.04 2, 635.17 62.85 249.38 ---------- 4,989.06 705.22 1,137.09
41.68 $ 42.44 ---31.42 302.37-----------8.50 27.54
13,678.03 32,907.50 9,814.81
184.14 257.64---------$ 219.09
7.93 23.12
420.62 787.32
101.62
.47 --
1,114.55
2.00 --------- ----------
109.57 ------
56,084.85 12.60 476,597.65 6,388.35 ---------
7,852.94 ---------- 20,928.09 36.64
39,097.00 120.13 261,696.84 729.74 ---
1,088.99 ---------- 1,566.81 --------- --------
5.33 ----------
275.34 -----
----- ------
1,540.45 246.09 ----------- ---------- --------- -----
539,744.32 28,848.72 302,953.27 2.656.26 1,397.22 1,896.11
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY1,1930TOJUNE30,1931.
Schedule No. 14-Cont'd.
OBJECT OF EXPENDITURE
ADMINISTRATION
General I Research I Enforce
Administra- and ofM.V. Quarry
tion
Analysis Law I
CONSTRUCTION
MAINTENANCE
Emergency~ I General
I Construction Surveys Mai ntenlnce Mainte-
Shop
nance 1
Land, Buildings
and Equipment
EQUIPMENT EXPENSES-Cont'd.
Repairs to Machinery Equip..... --------------$
Repairs and Upkeep Land and Buildings________________________ $ 2,437.51
135.32
231.59 $ 169.92
103.44 294.91
I ----- $
77.23 ---- ----- $ 62.50
7,144.81 $ 15.75 1,630.72
Delivery EXPense. G. 0. Shop 1----- -------
1,787.17-
TOTALS------------ ------$ 19,647.78$1,883.89$1,086.32$ 722.22$129,734.95$5,609.70$778,197.44$7,252.08$3,852.74
Total Expend I-
tures
610.08
11,693.62 1,787.17 $ 947,987.12
;g EQUIPMENT PURCHASES
Automobiles........ _
Trucks... -------------Tractors.. -.-- ______ ._ ..... _._ ..... _
-- $ 87,220.06 $ 87,220.06 90,896.47 90,896.47 65,525.43 65,525.43
Road Machinery Misc............. ______
__ ______ ------------.
Office Equipment.. ___________
- ----------- ------- ---------- ----------
Engineering Equipment..________ _____
_ ---------- ______
------------ ______ _
Shop Equipment.. ...... _________ ______________ _________ __________
__ ____________ _
115,137.47 18,411.19 24,643.21 6,lll.33
115,137.47 18,411.19 24,643.21 6,111.33
Quarry Equipment....
__ . . . . -.-....
..... -.-.-....
Laboratory Equipment....
10,661.23 10,661.23
Land and Buildings __ .......... .
196,165.44 196,165.44
-----1------------------1---- ------ ----1----
TOTALS .. ______ .. __
-- $ 614,771.83 $ 614,771.83
----- ------ --- -----
COMMUNICATION SERVICES
Telephone and Telegraph..... -- $ 11,226.34$ 47.16$ 4.90$ 30.47 $ 1,869.49$ 73.57 $ 5,229.631$
.80$ 93.40
$ 18,575.76
Postage .........
--
5,612.55
1.00 ---------- ----------
686.49 56.56 1, 798.50
.60 21.50
8,177.20
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----~ - - - - - - - - -
TOTALS .... _. _.. _.
1$ 16,838.89$ 48.16$ 4.90$ 30.47$ 2,555.98$ 130.13 $ 7,028.13$ 1.40$ 114.90
$ 26,752.96
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1.1930 TO JUNE 30. 1931.
Schedule No. 14-Cont"d.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF EXPENDITURE
I I General
Research Enforce
I Administra- and ofM. V. Quarry
tion
Analysis Law
Construction~ I I General Emergency Surveys Maintenance Malnte- Shop nance
Land. Buildings
and Equipment
HEAT. LIGHTS. POWER. WATER AND
CLEANING SERVICES Furnishing of Heat_ ______________ $ Furnishing of Lights____________ _ Furnishing of Power___________ _ Furnishing of Water____ _
Furnishing of Cleaning __
326.00 $ 41.43 - ----- -------- - $
1,626.84
97.36
873 .40 21.38 383.15 ----
46.86 ------ $ 92.23 --
187.18 $ !1.75
64.60 ---------- $ 44.71 -----------
420.57 ---------- 1,413.96-
2.24 -------
526.42
345.61
429.68 ----
Total Expend I-
tures
523.60 3,650.96
528.66 l. 869.00
383.15
TOTALS------------
- $ 3,209.39$ 160.17-
- ---------- $ 326.27$ !1.75$ 833.02 ---
- $ 2,414.77
6, 955.37
RENTS Rents. Road EQuipment- ____ _
Rents. Buildings and Grounds__ Rents. Office EQuipmenL _____ _
Rents. Engineering EQuipmenL Rents. Miscellaneous_________ _
TOTALS __ _
----- $
INSURANCE Fire Ins. B!dgs. and Fixtures ___ $ LiabilitY. Fire. Etc.. Equiot. __ _ Bond PrBmiums------
TOTALS ______ _
_$
2, 867.72 3,060.61
28.00 ------
5,956.33 -- ----
--- $ 106.42 -- ------ $ 25,108.51 $ 926.50 ---------- --
1,952.09$ 6.00 9,066.78----------$ 101.00------------
228.74 ----------
------------
5.00 ----
- $ 100.00
83.87 ---
1.00 ---------- ---------- ------------
26,141.43 13,993.59 3,289.35
5.00 212.87
$ 100.00$ 2,147.38$ 6.001$ 34,405.03$ 926.50$ 101.00 ------ ------ ----- ------ --"---
$ 43,642.24
10,854.49----------
- $ 187.92$
414.14$ 226.12 -------- - -----------
3,310.53
17.50$ 36.92--------
14.579.16$ 243.62$ 36.92$ 187.92$
94.16 -- ---- $ 763.82-
13,880.08
234.50 -----
1.232.00
- $ 1,246.65 105.00.
328.66 -- ------- $ 15,875.90 ---------- $ 1,351.65 --
13,147.04 14,520.34 4. 936.45
$ 32,603.83
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1,1930 TO JUNE 30,1931.
Schedule No. 14-Cont'd.
OBJECT OF EXPENDITURE
ADMINISTRATION
I I General
Research Enforce
Administra-
and
of M. V. Quarry
tion
Analysis
Law I
CONSTRUCTION
I Construction Surveys
MAINTENANCE
I I Emergency
General Mainte- Shop Maintenance nance
Land, Buildings
and EQuipment
Total Expendi-
tures
TRAVELING EXPENSES
Subsistence_____ _
I
14,598.23 $ 1,158.25 $3,975.00$ 18.001$
Transportation
Gas and OiL ______ _
Mileage Allow or Auto Hire___ _ Other Transportation__
15,973.31 1,796.01 4, 324.60
982.67 1, 739.87 ----
1.10 4,547.72 ---------
508.23 151.74
7.74
- - - - - - ~-- ---~
9. 371.03 $28,193.39 $ 18,816.83 $ 119.75$ 168.65 ------------ $ 76,419.13
38,137.01 280.70 626.31
8,202.69 12,372.40 124.04 378.95 ----------- 77,910.94
5.00
1.53 --
-----------
6, 632.06
18.67
132.38 ----------
83.88 -----------
5,853.55
- - - - - - - - - - - - - - - ~---
--~
TOTALS------
iS SUPPLIES AND MATERIALS
----- $ 36,692.15 $ 2,650.25 $10,414.331$ 25.74$ 48,415.05$36,419.75$ 31,323.14$ 243.79$ 631.48 ------------ $ 166,815.68 - - - - - -~ - - - - - - --~- - - - - - -~-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Office Supplies
Printed Forms and Stationery
6,328.56$ 330.17$ 34.00-
---$ 275.91 $ 9.86 $ 1,300.77 ---------- $ 93.00
--- $ 8,372.27
SundrY--------------Drafting and Engineering Sup-
plies_____ -----_
Photographic Supplies ___ _
7,997.37 120.34 32.75-----
:_ ----- 7,~~~::
--~----
313.80
8.77
20,981.61 3, 906.99 79.40
1,247.26 --
989.53$ 31.50 21.87 -
271.26 --------
9, 982.55
33,065.11 499.16
Cleaning and Toilet Supplies--
429.43-
;--
80.20
509.63
Laboratory Supplies------
2,696.49
2,696.49
Camp Supplies
Forage and Supplies-Anirr.als _ Provisions ________ _ Others____________ _ Tools ___ . __________ __
--- $
30.20
24,589.80 -23,999.2813,439.22 --2,635.37 ----------
1,134.82 --------- ---------- -----9,248.81 18.11 232.72 -----------
24,589.80 23,999.28 14,574.04 12,165.21
FueL--------------Explosives Signs ____ _
Materials __
----1:::_~~;:;~ ___ 1.812.33 :_::::::--[--:___
5,467.00
2.50
831.57 ----------
590.93 ----------
586,853.08 ----------
1,100.03 550.89
26,778.39 204,272.70
22.03 296.252.00 ---------- -----------1.15--------------------7,875.93105,215.64 ------------
8,767.37 1,576.96 27.370.47 904,217.35
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY1,1930TOJUNE30,1931.
Schedule No. 14--Cont'd.
OBJECT OF EXPENDITURE
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
Total Expendi-
tures
General supplies
_ ------ ~---~~ ~- u.75 ==~~~-~~~ ~~~=--~ ~~~~~ ~_!~~:_.~ ~- ~~~~~=--~~~ =~~~~ _1!).~7_-~
TOTALS ---------------------$ 24.164.31$3,158.73$ 57.75$ 673.57$683,719.86$3,928.12$259,994.56$ 8,038.73$108.277.61 ____________ $1.092.013.24 - - - - - - - - - - - - - - - - - - ------ - - - - - - - --~~ ---~- ~--- - - - - - - - - 1 - - - -
PRINTING, BINDING, PUBLICITY, ETC. Printing "Annual Report" _____ _
Printing MaPS---------------------$ Publication-' 'Georgia High-
1.158.66 ---
1.158.66
ways"---------------------------Stenography, Typewriting and
Multigraphing, .Job Work _____ _
1,163.71260.84 -
- -- $ 38.40 ---
1,163.71 299.24
Photo Printing and Developing. .Job Work------------------------
57.38
- $ 10.47
9.90 -----------
77.75
TOTALS------------
2,640.59-
-------- $
10.47$ 48.30 ----
2, 699.36
CLAIMS Compensation Employees Damage, Others ____ _
TOTALS----------
- $ 12,415.536,073.01-
--- $ 18,488.54-
$ 12.415.53
-- - - - - ~-----
6,073.01
$ 18,488.54
12.498.251.81 383.00
12.498,634.81
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1930TO JUNE30,1931.
Schedule No. 14-Cont'd.
OBJECT OF EXPENDITURE
ADMINISTRATION
CONSTC.UCTION
MAINTENANCE
I I General
Research Enforce
Administra-
I and of M. V. Quarry
tion
Analysis Law
I Construction Surveys
I General Emergency[
Maintenance Maintenance
Shop
Land, Buildings
and Equipment
Total Expendi-
tures
SPECIAL AND MISC. EXPENSES
Advertising_ Blue Prints ___ _ Tests ____ _
------- $
Subscriptions and Dues--
Incidentals__
__________ _
Interest__
3, 704.06 67.06 $ 315.35
3, 726.61 2,068.67
418.82 -
90.80 48.00 6.00197.58 $
---------- $ 4, 037 _55 $59,110.57 $
27,090.81
L04
70.50$ 2.88 3, 798.72 29.35
9.30 ---------- ----------
1,678.33$ 14.09$ 1,040.00-
5.00
493.89 -
39_22
3, 704.06 63,315.28 30,187.62 3,737.61 6, 700.81
418.82
TOTALS __
-- $ 10,300.57 $ 342.38$ 70.50$ 2.88$ 34,927.08$59,140.96$ 2,:8L52 $ 14.09$ 1,084_22 __
$ 108,064.20
TOTAL EXPENDITURES--_$ 491,383.57$28,178.63$24,267.28$ 4,788.8513,999,096.99199,766.43$2.124,125.69 $69,67L06185,860.04 $ 6l4,77L83 17.741,910.37
-------
-------------------------1----: ------
LESS: INTER-DEPARTMENTAL
Bl LUNGS
Blue Prints
G. 0. Salaries
_____ $
G. 0. Supplies and Materials__
54,712.40 9,508_55
54,712 .4C 9,508.55
Shop Total Expenditures __
Research and Analysis: Total Test Expenditures_
------------ $25,797.76-
185,860.04
185,860.04 25, 797.76
TOTALS--NET EXPENDITLRES-
64,220.95$25,797.76-
-- 185,860_04-
$ 275,878_75
:$ 427,162.62 $ 2, 380 _87 $24,267.28 $ 4, 788.85 13,999,096.99 199,766.43 $2.124,125.69 $69, 67L06 _
-- $ 614, 77L83 17,466.031.62
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1930 TO JUNE 30, 1931.
~ ---
Schedule No. 14- -Cont'd.
OBJECT OF EXPENDITURE
ADMINISTRATIOIII
I I General Research Enforce
I Administra
and
oiM. V. Quarry
tion
Analysis Law
CONSTRUCTION
I Construction Surveys
MAINTENANCE
General Emergency
I I Mainte nance
Maintenance
Shop
Land, Buildings
and Equipment
Total Expendi
tures
ADD: Transfers (Expenditures for Convict Farm) _________ ---- -----
TOTAir-EXHIBIT "C" -------
--------- -------
------- ---------
--
---
--------- --- $ 2,109.80 -------
-- 17.468.141.42
AdmJnistration General Administration_ Research and Analysis. __ Enforcement of M. V. Law. Quarry __
Construction Construction __ _ Surveys______ _
Maintenance General Maintenance _ Emergency Maintenance.
Land. Buildings and Equipment. Transfers-Convict Farm __ _
TOTAL-EXHIBIT "C" _
SUMMARY
.$ 427,162.62 2, 380.87 24.267.28 4, 788.85 $
458,599.62
.$13,999,096.99 199,766.43 14,198,863.42
.. $ 2,124,125.69 69,671.06 2, 193,796.75
614,771.83 2,109.80
--.$17,468,141.42
l
1
PART THREE CONSTRUCTION
Bibb County- Bridge over Walnut Creek
CONSTRUCTION AND ENGINEERING FISCAL YEAR ENDING JUNE 30, 1931
There has been no change in the Engineering Organization as described in the Twelfth Report. The officials of this branch are shown on the organization chart on a preceding page.
After a survey is made for location or relocation of a project and has been accepted, plans are drawn and specifications and estimates are made, contractors are notified by newspaper advertisement or letter and are invited to bid on the project. Bids are opened on a specified day and at a specified hour by the Board and the contract awarded to the lowest pre-qualified bidder whose bid complies with specification requirements. The Board reserves the right to reject any bids that contain doubtful proposals or irregularities. A certified check of specified amount is required to accompany all bids. After the bid is accepted, the line of survey is laid out and properly staked, to agree with the profile and plan, by the resident engineer under the supervision of the Division Engineer in whose division the project lies and when the work begins a resident engineer and inspectors are put on the job.
As the work progresses, samples of all materials are furnished to the Laboratory on arrival on the job. These samples are tested to see that the material meets fully the requirements of the specifications. In case any of the material fails to meet test requirements, the Resident Engineer is immediately notified to reject the material represented by that sample. In the case of concrete pavements, after the pavement has been laid, the Laboratory sends out a machine for boring cores from the completed pavement. These cores are taken at arbitrary distances and furnish a check on the thickness of the pavement laid and the quality of the concrete in the pavement. In case the core lengths show that the pavement is not so thick as specified the contractor is penalized for the length of pavement found to be thin.
During construction of all projects regular inspections are made of the work by the Resident Engineers and Inspectors in charge. The Division Engineers make frequent visits to the work. A representative from the General Office, also, makes inspections of the construction as it progresses. Before any project is finally accepted a thorough inspection is made by the Division Engineer and a representative from the General Office. All final estimates must be approved by both the Division Engineer and by a representative of the State Highway Engineer from the General Office.
During the progress of the work monthly estimates are prepared by the Resident Engineer, checked by the Division Engineer, and when approved by the State Highway Engineer the
99
contractor is paid 90% of the value of the work which has been done. Ten per cent is retained until the project has been completed and final inspection made.
Bridge work is handled in very much the same way as road work. Designs for all bridges are prepared by the Bridge Engineer and his assistants. During the construction of bridges, regular inspections are made of the work by the Bridge Engineer or his representative. Final inspection of bridges after completion is made by the Bridge Engineer and before the final estimate is paid the Bridge Engineer certifies that he has made final inspection and found the work satisfactory.
During the period of this report the miles of road and the bridges completed were as follows:
Graded, Sand Clay and Top Soil, roads ....... 246.270 miles Gravel and Chert, roads.................... 57.255 miles Macadam Base and Water Bound Macadam,
roads. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27.545 miles Surface Treatment, roads................... 19.815 miles Lime Rock Treatment, roads................ 62.094 miles Bituminous Mixture, roads. . . . . . . . . . . . . . . . . 28.541 miles Bituminous Macadam, roads....... . . . . . . . . . 72.884 miles Bituminous Concrete (non rigid base), roads. . 54.884 miles Bituminous Concrete (rigid base), roads. . . . . . 4.851 miles Portland Cement Concrete, roads ............ 163.772 miles Resurfaced, roads.......................... 79.203 miles Making a total of 148 projects and 817.114 miles of roads. Besides there were completed: Timber and I Beam Bridges ............... . 1.853 miles Concrete Bridges ......................... . 2.005 miles Steel Structure Bridges .................... . .031 miles
A Total of 109 Bridges and 3.889 miles.
A portion of the above projects were brought into this year from former years and completed, the remainder originated and were completed during the current year.
During the Fiscal Year ending June 30, 1931, there were placed under construction the following types and miles of road:
Graded, Sand Clay and Top Soil ............ 578.249 miles Gravel and Chert.......................... 55.414 miles Macadam and Water Bound Macadam....... 21.218 miles Surface Treatment......................... 30.733 miles Lime Rock. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141.305 miles Bituminous Mixture. . . . . . . . . . . . . . . . . . . . . . . 56.512 miles Bituminous Macadam...................... 19.574 miles Sheet Asphalt. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29.844 miles
100
Bituminous Concrete (non rigid base) ....... . 33.700 miles Bituminous Concrete (rigid base) ........... . .074 miles Portland Cement Concrete ................. . 162.739 miles Brick ................................... . 2.500 miles Resurface ................................ . 156.151 miles
A total of 228 projects and 1,288.013 construction miles. A number of above projects were completed and appear on the list of completed projects above, the remainder will be carried into the future period for completion.
Owing to the keen competition between bidders and lower prices and more plentiful supply of material and labor, the contractors bids show an appreciable decrease in cost to the public, also, their work shows more uniformity, due to being more familiar from past experience with the specifications of the Board.
In addition to the projects let to contractors, the Board has a State Construction force, which constructs graded and surfaced roads and bridges. This force consists of free labor on some projects and convict labor on others. The force is divided into groups and operates in different parts of the State, mainly where the work is unattractive to contractors and where the projects can be more economically constructed. The work of the convict force is confined to State projects as the Federal Government does not participate in work performed by convict labor.
'fhe State projects, forces and convict camps are under a Construction Engineer known as the Engineer in charge of State Forces (or the Bituminous Engineer), who reports direct to the State Highway Engineer. A more descriptive narration of the work of this construction unit will be found elsewhere in this report.
Federal Aid is received on such projects on the Federal system that are submitted through the Bureau of Public Roads at Washington and approved. With the consent of the Bureau of Public Roads, surveys, plans and project estimates are made on a portion of the Federal system, which are forwarded by the State Highway Board to the Bureau of Public Roads. Upon the recommendation of its Engineer or representative and the approval of the Bureau, a project agreement is made between the Secretary of Agriculture and the State Highway Board; the amount agreed upon is set aside from funds apportioned to the State as Federal Aid. The Board then proceeds according to the method already described in letting contracts. The Board pays the monthly estimates to the contractors and is reimbursed by the Federal Government for its share.
The Government does not pay any part of rights-of-way, surveys and plans. The Government's part is half the amount of
101
the accepted cost of construction, as agreed upon, up to $15,000.00 per mile. However, the Government does not limit itself in paying half the cost of bridges.
County participation in construction is by special agreement with the Board and is usually a certain sum to be paid either in cash, convict labor, materials, or all three. This source of revenue, which at first (as explained in a preceding section of this report), was the only means of matching Federal Aid, has now practically ceased. The Department receipts from other sources are now sufficient to finance its annual construction program.
Furthermore, the last (1931) Legislature passed an Act that the Board should begin to repay the Counties in 1936 for amounts advanced by them on construction. Heretofore, the law was that the Counties were to be repaid after the completion of the State Road System.
Oostana.ula River Bridge at Rome
102
STATE HIGHWAY BOARD OF GEORGIA GIVING CONGRESSIONAL DISTRICT, AREA, POPULATION AND
STATE MILEAGE AT JUNE 30, 1931.
ENGINEERING DIVISION ONE (22 COUNTIES)
Headquarters: Cartersville.
W. F. Montgomery, Division Engineer.
-I
COUNTIES
Cong. Dist.
Area in Square Miles
1930
!
i
State Mileage
Population I At June 30,
I 1931.
Bartow _____ - ---- ----
7
CampbelL_ ------ ---
5
CarrolL _______
---
4
Catoosa ____ -----
7
Chattooga _____ ----- --
7
Cherokee _____ ----- ---
9
Clayton ___ ----- - ----
6
Cobb _______ -----
7
Dade _______ - ---------
7
Douglas __ ------ -----
5
Fannin ___ --- --- -- ---
9
Floyd ____ -------- ----
7
Fulton _____ --- ------
5
Gilmer_ _____________ --
9
Gordon ________________
7
Harlason _________ } { u r r a y ___________
. -----
-----
7 7
PPPoiaculkkled_n_in_s_g___________________________--_--_--_--_--_--
7 9 7
Walker_ ___________ ----
7
Whitfield _______ -------
7
Totals 22 ----- - ---1----------
471 211 492 169 328 429 142 353 186 208 401 502 193 440 375 284 342 324 231 317 432 283
7,113
25,364 I
9,903
34,272
9,421 I
15,407 20,003 10,260 35,408 4,146
9,461 12,969 48,667 318,587
7,344 16,846 13,263 9,215
12,327 9,687 25,141 26,206 20,808
i
59.434 20.090
72.890 13.431
32.483 41.799 28.610 52.797 24.100 18.640
45.008 78.997
7.790
35.372 56.245 34.711 51.616 20.854 44.821
40.692 34.303 46.049
I 694,705
860 732
I
I
103
STATE HIGHWAY BOARD OF GEORGIA ENGINEERING DIVISION TWO (31 COUNTIES)
Headquarters: Gainesville E. A. Fish, Division Engineer
COUNTIES
Cong. Dist.
Area in Square
Miles
State
1930
Mileage
Population At June30,
1931.
B a n k s __________________
9
Barrow _________________
9
C l a r k e __________________
8
Dawson ________________ DelCalb _________________
9 5
Elbert __________________
8
Franklin _______________
8
Forsyth ________________
9
Greene _________________
8
Gwinnett ______________
9
Habersham _____________
9
HalL ____________ ------Hart ____________________
9 8
Jackson ________________
9
Lincoln ________________ Lumpkin _______________ M a d i s o n ________________
10 9 8
Milton _________________
9
Morgan _________________ Newton ________________ Oconee _________________
8
8 8
O g l e t h o r p e _____________ Rabun _________________
8 9
Rockdale _______________
5
Stephens _______________
9
Taliaferro ______________ Towns _________________
10 9
WUnailotonn________________-_-_-_-_-_-_-_-_-
9 8
White __________________
9
Wilkes __________________
8
Totals ______________ ----------
222 168 114 216 272 361 279 247 416 440 290 437 261 355 291280 284 137 390 262 172
504 377 119 166 212 181 324 331 245 458
8,811
9,703 12,401
25,613 3,502 70,278 18,485
15,902 10,624 12,616 27,853 12,748 30,31315,174 21,609
7,847
4,927 14,921 6,730 12,488
17,290 8,082 12,927 6,331
7,247 11,740 6,172 4,346
6,340 21,118
6,056 15,944
29.400 35.076 30.570 32.384 33.837
74.100 51.540
28.300 60.300 72.470 39.570 76.454 48.690 58.340
32.600 46.200 58.950 10.000 51.500 40.180
37.260 58.500
40.290 8.958
25.659 13.000 28.580 44.160 45.166
24.500 51.500
457,327 1,288.034
104
STATE HIGHWAY BOARD OF GEORGIA ENGINEERING DIVISION THREE (28 COUNTIES)
Headquarters: Thomaston W. S. Dennis, Division Engineer
COUNTIES
Cong. Dist.
Area in Square Miles
State
1930
Mileage
Population At June30,
1931.
Bibb ___________________
6
Butts __________________
6
Chattahoochee _________
4
Coweta _________________
4
Crawford _______________
6
Doo1y __________________
3
Fayette _________________
6
Heard __________________
4
H e n r y __________________
6
Harris __________________
4
Houston _______________ 12
Jasper _________________
6
Jones __________________
6
Lamar_ _________________
6
Macon __________________
3
Marion _________________
4
Meriwether _____________
4
Monroe _________________
6
M u s c o g e e _______________
4
Peach __________________
12
Pike ___________________
6
Pulaski. _______________ 12
Schley _________________
3
Spalding _______________
6
Talbot. ________________
4
Taylor _________________
3
Troup __________________
4
Upson __ . ______________
6
Totals ______________ ----------
277 203 218 443 319 397 234 285 324 501 443 321 377 184 332 360 496 470 235 179 237 258 154 209 312 340 435 317
8,860
77,042 9,345 8,894
25,127 7,020
18,025 8,665 9,102 15,924
11' 140 11,280
8,594 8,992 9,745 16,643 6,968 22,437 11,606 57,558 10,268 10,853 9,005 5,347 23,495 8,458 10,617 36,752 19,509
478,411
49.165 31.058 37.840 74.490 45.320 45.515 23.610 39.170 44.950 43.560 63.850 60.250 50.109 32.380 51.600 34.550 55.250 43.640 50.476 30.519 38.931 54.685 28.783 38.693 45.846 33.760 56.460 61.830
1,266.290
105
STATE HIGHWAY BOARD OF GEORGIA ENGINEERING DIVISION FOUR (24 COUNTIES)
Headquarters: Louisviile
Henry E. Newton, Division Engineer
COUNTIES
Cong. Dist.
Area in Square Miles
-
I
! State 1930 1 Mileage Population I At June 30,
: 1931.
Baldwin _____________ -
10
Bleckley__ --- --- -----
12
Burke ___ .
l
Bulloch _____ ----
l
Candler_
-- ---- --
l
Columbia ___ ------ ----
10
Dodge ____ --------
12
Effingham_ - ----- ----
l
EmanueL -- ------ -----
12
Glascock __ --------
10
Hancock ___ --------
10
Jefferson __ -- --------
10
Jenkins ____ ------------
l
Johnson __ ------------
12
Laurens _____ ----- ----
12
McDuffi Putnam
e_________-_-_-_-_-_-_-_-_-_-_-
10 8
Richmond __ -----------
10
Screven _____ ----------
l
Treutlen ____ . ---- ----
12
Twiggs ______ ------ --
12
Warren _______ ---- ----
10
Washington _______ ---- 10
Wilkinson _____ ----- ---
10
Totals ___ ---------- ------ ---
307 205 956 668 228 350 431 448 764 170 530 646 342 292 806 287 361 319794 262 314 404 669 472
11,025
I
22,878 i
9,133 29,224 26,509
8,991 8,793 21,599 10,164 24,101
I 4,388
13,070 20,727 12,908 12,681 32,693 9,014
8,367 72,990 20,503 7,488 8,372 ll, 181 25,030
I 10,844
44.200
32.425 81.595
70.590 27.050 34.000 48.490
35.000 107.257 14.375 62.800 90.000 40.000 30.716 75.823
41.206 58.800 68.036 46.100 15.800
51.398 42.853 61.300 43.909
431,648 1,223.723 I
106
STATE HIGHWAY BOARD OF GEORGIA ENGINEERING DIVISION FIVE (30 COUNTIES)
Headquarters: Moultrie E. A. Stanley, Division Engineer
I State
COUNTIES
Cong. Area in
1930
Mileage
Dist.
Square Population At June 30,
Miles
1931.
- - - - - - - - - - [ - - - - - [ - - - - - - - - 1 - - - - -1 - - - - - -
Baker_ ________________ .II
2
Ben Hill-______________ _ 3
Berrien________________ _ 11
Brooks_ _____ _________ _ 11
Calhoun _____________ _ 2
Clay _________________ _ 3
Colquitt ______________ _ 2
Cook_ _________ _______ _ 11
Crisp _________________ _ 3
Decatur_ _____________ _ 2
Dougherty ____________ _ 2
Early _______ .. __ ______ _
2
Grady_ _______ ________ _ 2
Irwin______________ ___ _ 11
Lee___________ ___ ___ _ 3
Lowndes ____ . _______ _
11
Miller_ _____ ___ ______ _ 2
Mitchell. ___ ________ _
2
Quitman ____________ _ 3
Randolph __________ _ 3
Seminole ____________ _ 2
Stewart__ __ __________ _ 3
Sumter_ ______________ _ 3
TerrelL _______________ _ 3
Thomas _______________ _ 2
Tift __________________ _ 2
Turner. _______________ _ 3
VVebster _______________ _
3
VVilcox ____________ ____ _ 12
VVorth _______________ _ 2
357
7,818
32.770
256
13,047
13.301
455
14,646
56.160
514
21,330
73.450
284
10,576
40.100
203
6,943
37.411
529
30,622
77.880
241
11,311
44.470
277
17,343
41.651
583
23,622
54.392
342
22,306
24.827
524
18,273
55.900
444
19,200
56.020
378
12,199
42.480
326
8,328
26.900
483
29,994
74.690
253
9,076
46.380
548
23,620
54.946
144
3,820
36.660
412
17' 174
39.080
240
7,389
15.900
411
11,114
67.950
456
26,800
76.580
322
18,290
29.641
530
32,612
73.100
243
16,068
48.040
231
11,196
26.218
302
5,032
24.110
403
13,439
44.290
651
21,094
55.370
Totals __
11,342
484,282 II 1,390.667
107
STATE HIGHWAY BOARD OF GEORGIA ENGINEERING DIVISION SIX (26 COUNTIES)
Headquarters: Waycross H. J. Friedman, Division Engineer
COUNTIES
Cong. Dist.
Area in Square
Miles
State
1930
Mileage
Population At June 30,
1931.
Appling ______________ _ 11
Atkinson ____________ _ 11
Bacon_________________ _ 11
Brantley____________ _ Bryan _________________ _
11
1
Camden___ _____ ______ _ 11
Charlton ______________ _ 11
Chatham______________ _ 1
Clinch _____________ _
11
Coffee ________________ _ 11
Echols_ ______ ________ _ 11
Evans _________________ _ 1
Glynn ________________ _ 11
Jeff Davis _____________ _ 11
Lanier_ _______________ _ 11
Liberty________________ _ 1
Long- _________________ _ 1
Mcintosh _____________ _ 1
Montgomery ___________ _ 12
Pierce _________________ _ 11
TattnalL _____________ _ 1
Telfair_ ______ ______ _
12
Toombs ______________ _ 12
Ware __________________ _ 11
Wayne ______________ _ 11
Wheeler_ _____ ________ _ 12
Totals _______________________ _
454 330 271 434 431 711 792 370 747 632 362 287 439 300 191
543
393 470 190 345 466 373 393 771 615 264
11,574
13,314 6,894 7,055 6,895 5,952 6,338 4,381 105,431 7,015 19,739 2,744 7,102 19,400 8,118 5,190 8,153 4,180 5,763 10,020 12,522 15,411 14,997
17' 165 26,558 12,647 9,149
362,133
62.715 49.343 32.940 27.048 62.038 42.303 19.238 58.316 67.811 33.156 26.800 20.578 53.804 24.836 40.820 34.734 45.263 33.006 23.395 21.896 68.860 35.995 43.136 78.716 56.138 46.179
1,109.064
108
STATE HIGHWAY BOARD OF GEORGIA RECAPITULATION OF ENGINEERING DIVISIONS AREA, POPULATION, STATE MILEAGE, JUNE 30, 1931
Engineering Division Counties
Area in
Square Miles
1930 Population
State Mileage
June 30, 1931
One __________________ Two ___________________
22 31
Three__________________ 28
Four_ __________________ Five ___________________ Six ____________________
24 30 26
Totals ____________ 161
7,113 8,811 8,860 11,025 11,342 11,574
58,725
694,705 457,327478,411 431,648 484,282 362,133
2,908,506
860.732 1,288.034 1,266.290 1.223. 723 1,390.667 1' 109.064
7' 138.510
SUMMARY OF CONGRESSIONAL DISTRICTS AREA, POPULATION, STATE MILEAGE, JUNE 30, 1931
Congressional Districts Counties
Area in
Square Miles
State
1930
Mileage
Population At June 30,
1931
One ___________________ 13
Two ___________ - - - - - - -- 13
Three__________________ 15
Four___________________ 10
Five ___________________ Six ____________________
5 13
Seven _________________ 13
Eight__________ -------- 13
Nine ___________________ 19
Ten ___________________ 12
Eleven _________________ 20
Twelve_________________ 15
Totals ____________ 161
6,396 5,528 4,563 3,777 1,003 3,614 4,366 4,193 5,586 4,657 9,465 5,577
58,725
260,291 242,276 189,719 220,708 415,476 221,050 262,219 198,927 225,226 212,934 248,290 211,390
2,908,506
623.130 635.625 579.160 510.532 89.315 548.546 545.712 667.056 758.383 548.279 928.814 703.958
7' 138.510
109
State Route No. 26, U. S. No. 80, Effingham County Concrete Paving
Proj. 474, Grady County- Bridge over Barnetts Creek Old Bridge on Left 110
SURVEYS
1'here are several survey parties constantly in the field locating and relocating roads and bridges. They operate in every part of the State and keep the surveys well in advance of construction. To illustrate, surveys during the fiscal year approximated twentytwo hundred miles. The accepted routes on these surveys are over a vear ahead of actual construction from the estimated funds a~ticipated from all sources.
PLANS
The drawing room has been busy with a full crew of draftsmen preparing plans for an enlarged road program in consequence of increased State and Federal funds available. There have been 951 miles net of plans prepared, which indicates easily a total of eleven hundred or more miles actually drawn.
BLUE PRINTS
As stated in previous reports, the State Highway Board has operated blue printing machinery for several years, also, during the period of this report photostatic equipment has been installed. The latter equipment has not been in use long enough to give a satisfactory report of its operation. However, it is much needed equipment and has proven its value.
Formerly, blue printing was done by commercial houses at a higher cost and, at times, the prints were not delivered as promptly as expected, due to the stress of other demands.
Our records show that during the fiscal year ending June 30, 1931, there were printed 792,000 square feet at a cost of $11,880.59, covering material, power, labor and upkeep, which was an estimated saving of $7,920.00 as against the invoice cost by commercial houses.
lll
~Fulton County , Stewart Ave.- State and County State Material- County Convict Labor
Jasper to Fairmount-Fine School in Grove 11 2
Graded Project Sand Gravel Number Clay and and
Top Soil Chert
STATE HIGHWAY BOARD OF GEORGIA PROJECTS PLACED UNDER CONSTRUCTION DURING FISCAL YEAR ENDING JUNE 30, 1931
ENGINEERING DIVISION ONE. Types and Miles of Road
Macadam Base and Surface
W. B. TreatMacadam ment
Lime Rock
Bitu- Bitu- Bit. Cone. Bit. Cone.
minous minous NonRigid Rigid Cement
Mixture Macadam Base
Base Concrete
Resurfaced
20 31-0 __ -
36 4L __
41-B_
54 -.... 65 ___ _
c;; 217__
224 248-A 248-A __
248-B 263 __ 289-B_ 37L __
394-B __
394-0_413-B __ 413-0 __ 413-D __
413-E.422-A 422-B 422-0_ 422-D __
9.533
4.987 4.648
.665
--- _I ______ I
I
- ---1
4.780
11.552 6.528 .612
4.987
--
13.290
2.850 10.830 2.228 2.390
8.159
----
--
------ I
4.980 4.832 2.680 2.946 2.199 4.623 1.048 2.326 10.796 4.049
STATE HIGHWAY BOARD OF GEORGIA DIVISION ONE-Continued. Types and Miles of Road
Project Number
Graded
Sand Clay and Top Soil
Gravel and Chert
I Macadam
Base and Surface W.B. Treat-
Macadam ment
- - ---~-
---------
426-A ____ _
426-0--- - 696-A_____ 5.000
696-B ____ 773 ____ --774 __ _
2 . 850
805-0 806-B_
3.255 5.188
900-0- - - -- -
4.300
~ ~~~=~~ ~--- 1. 613
986-0- - - -988-B ______ _ 988-D ___ _
988-E_____ _ 989_______ _
1. 814
--
4.098 3.726
5.800
991-0 _____ -------
.462
996-B_____ _
_ _________ _
997-A_ ____ 1. 960
1023___ ---1037_____ _
2.388
1055____ --
Lime Rock
Bituminous Mixture
----~
Bitu- Bit. Cone. Bit. Cone. Portland
minous NonRigid Rigid Cement
Macadam Base
Base Concrete
-~---- - - - - - - -
-----
----
3.400
.. - - -
.680
7.128
----
---
---
5.914
4.880
.295 5.000
Totals __ 33.070 26.829
2.388
5.914
8.280 11.908
29.654
Resurfaced
4.350 13.390
Number of Projects __ _ Miles of Road ______________ _
47 216.009
Route No. 24, Cherokee County- Grading South of Canton
Proj . 424-C , Paulding County, State Route No. 6 Bridge West of Dallas 115
STATE HIGHWAY BOARD OF GEORGIA PROJECTS UNDER CONSTRUCTION DIVISION TWO Types and Miles of Road
Project
Graded Sand
Grav_el MBaasceadaanmd I Surface
Number Clay and and
W. B. Treat-
I Top Soil Chert I Macadam ment
23 ___ - --68______ -109 ________ 111-A___ _ _ _______ _
126-B_ ____ 9.474 __
215________ 2.830 -231-A _________________ _
247-A_____ ~ 247-B_____
6.048 .548 ______
______ _
"'247-B_____ 5.820 ______ 266_ ___ ____ ___ ______ __
__ ____ _ Slag 3. 630 __
274-A___ _ 283 _______ _ 284 _______ _
2.369 ________ _
2.760
285 _______ _ 296-C ____ _ 308____ ---
--
.857
310___ -312_____ - --------317-B ____ _
321____ ---. 330 ________ -
__ Slag5.851
--
7.578
332________ --
361___--. - ---------372-B _____ 2.941 382-B ____ _
382-E______ . ------- __
Bitu- Bitu- IBit. Conc.IBit. Conc.l Portland
Lime minous minous NonRigid Rigid Cement
Rock I Mixture Macadam Base
Base Concrete
7.290
6.630
2.930
- - - - - ..
3.692 6.858
3.400 2.920
9.050
2.672
.178 2.155 2.106 1.779
Resurfaced
6.850
Project Number
Graded Sand Gravel
Clay and and Top Soil Chert
STATE HIGHWAY BOARD OF GEORGIA
Macadam Base p,nd
W. B. Macadam
J)IVISION TWO-Continued. Types and Miles of Road
Surface Treatment
Lime Rock
Bitu- Bitu- Bit. Cone. Bit. Cone. Portland
minous minous NonRigid Rigid Cement
Mixture Macadam Base
Base Concrete
Resurfaced
402-A _____ __________ _______ _ ____ _
444-A ____ 11.477
________ _
444-B_____ 7.562 _________ _ 448-C ____ __________ __________ _________ _
458-A _____________________________ _
469 ________ -
483-B ____ _ 483-F____ _
::: 613 _______ _
-'l 754____ ---755 _______ _
775 ____ -
2.322 5.000 1.100 3.345 5.800 1.032
798____ --- ---------- --
800-A_
4.950
809 ____ -
11.000
856-A __
10.000
856-B __
9.174
964-D __ 979-A __
4.538 4.145
982 -1056 ___ _
9.349
-
14.200
2.925
.795 4.285 7.802
.277
l. 706
Totals__ 114.332 11.309 18.830 27.463
23.540
9.050 --
33.975
6.850
Number of Projects ________ _ Miles of Road _______________ _
48 245.349
............
00
Route 8.- Barrow County.-Concrete.
Route No. 13. Ball County, near T. B. Sanitarium.
Proj . 17, Harris County Paving Mixer between Chipley and Columbus
State Route No. 22, Muscogee County, North of Columbus Overhead Bridge Maintained by Regular Force
1!:0
STATE HIGHWAY BOARD OF GEORGIA PROJECTS UNDER CONSTRUCTION DIVISION THREE Types and Miles of Road
Graded Project Sand Gravel Number Clay and and
Top Soil Chert
Macadam Base and Surface
W. B. TreatMacadam ment
Lime Rock
Bitu- Bitu- Bit. Cone. Bit. Cone. Portland
minous minous NonRigid Rigid Cement Resur-
Mixture Macadam Base
Base Concrete faced
38_ ------- ---------88-B_____ 12.874
113_____ -- ------- -- ---
~ 183-B _ ____ 4. 803 ___
_____ _______ _
,_. 193-A ________________________________ _
3.250
243________ ---------- ----
259-B_____ 8.696 __ _
260________
.178 ----
345-A ____________________ _
345-B _________________ _
380________ ---------- ---401-B _________________ _
---- - - - ---
401-C _________________ _
409-F______ 13.945 ___ _ 418-A _____ ___________ _
436-B ___________ _
445-E___
2.107
475-A _____________ _
597-----
4.000
.716 .092
.167
.547 8.000 -----
.472 3.000 --
9.963
-----
12.742
3.599 3.348
Project Number
I Graded Sand Gravel Clay and and Top Soil Chert
STATE HIGHWAY BOARD OF GEORGIA
DIVISION THREE-Continued.
Macadam Base and
W.B.
Macadam
Types and Miles of Road
Surface Treat-
ment
Lime Rock
I Bitu-
ruinous
I Mixture
I
I
I I
I
Bitu- Bit. Conc.IBit. Cone. Portland'
ruinous NonRigid Rigid Cement Resur-
Macadam Base
Base Concrete faced
615____ --- 10.700
---
787-A __ -- 7.765
----
813_ ------- 6.000 --- -
932-B __ --
.795
~g:~~~J 938_ ------ --
945-A _____ 945-B_ ---
---
-I
945-B ___ . - --
950-B __ -- ---------- -----
951___ -
2.138 ----- ----
970____ ---
5.280 --------
976 ___ 1030 _____
- ---------- 6.568
6.000 -- -------
..
---
'
I
I
---
--
--
----
-- -------
4.505
...
----------
--
-
-- -
-
--
-
-
' -
--------- ---
3.980
--
.966 --
--,- - --- - -------
----
----
::-1 :I -----
--
'
--
-------
- ---
-- -
--- --- -----
---
----
Totals __ 94.918 6.568
-I
-
3.250
I 32.408 - --
'
1--
'
I
---
I
I
J -
I
I
-
--
12.742 I --
Number of Projects Total Miles .
32 156.833
I --
I
I
-- I,
-----.
6.947 --
1,
State Route No. 1, Chattahoochee County Excavation for Concrete Gutter
State Route No. 1, Chattahoochee County Same Gutter completed with Concrete 123
State Route No. 24, West of Louisville-Bridge over Ogeechee River
Proj. 32, Columbia County-Brick Paving East of Harlem 124
STATE HIGHWAY BOARD OF GEORGIA
PROJECTS UNDER CONSTRUCTION DIVISION FOUR
Types a.nd Miles of Roa.d
Gra.ded Project Sa.nd Gra.vel Number Cla.y a.nd a.nd
Top Soil Chert
Ma.ca.da.m
Ba.se a.nd Surfa.ce W. B. Trea.t-
Ma.ca.da.m ment
25_______ 17.120
25-A_ ____
. 982
25 B_____
.138
29-0- - - -- -- --- - -- - - - - -- 29-E_____ 4.855 _____ _ ~ 32-A _____________________ _
()1 32-A _____________________ _
32-B _____ ---------- _________ _
66 _______ ---------- ---
124_------ -------138-B _____ 1. 707
141-0 _____ --------
150-- ----- ---- ----- --17G-A _________ _
17G-B _____ ---------- __
170-0- - --- - - - - - -- - - - - - 182 _______ 8.110
197-A ___ _ 197-B _____ _
207-B _____ _
229 _______ ---------235-A_____ 3.116 409-A ______________ _
~1--- -- --
Lime Rock
Bitu- Bitu- Bit. Cone. Bit. Cone. Portla.nd
minous minous Non Rigid Rigid Cement Brick Mixture Ma.ca.da.m Ba.se Ba.se Concrete
5. 792 -7.668 ----
- ~~~~~:~1- ----1
8.500
2.455 --- ---------- 2.500
.607 ---.677
.438 -----
4.554 5.811 1 1.450
2.250 1.439 4.850 6.060
1.457
-I
STATE~HIGHWAY BOARD OF GEORGIA
DIVISION FOUR-Continued Types and Miles of Road
Project Number
Graded Sand Gravel
Clay and and Top Soil Chert
Macadam Base and Surface
W.B. TreatMacadam ment
Lime Rock
Bitu- Bitu- Bit. Cone. Bit. Cone. Portland
minous minous Non Rigid Rigid Cement Brick
Mixture Macadam Base
Base Concrete
470-A _____ 17.039 471-A_____ 4.500 _
472-A _____ ---------------
472-B _____ -----------475-B_____ 7.840 t; 477-A _____ ----------
a> 594_-- --- 20.000
629 _______ ----------
640 ______
9.800
793 ___ --- 3.880
796_-- ---803_---- -820-A_ ____
820-B_____ 824 _______
15.972 8.000 6.249
6.000 _ 14.697
927- - - - - -- - - - -- - - - - - - 942-B _____ 1.340
Totals_ ___ 151. 354
--~---_--- __:__:_-_----1.:_:__-_ -----~------ ---_ 1~
I --------1----- _ 13.460
Number of Projects_ Miles of Road ______ _
----------- 40 243.733
16.300 -----9.372 -----
6.725
3.400 ----------
.074 .074 76.345
2.500
Proj . 29-C , Emanuel County
Proj . 472-B , Burke County- Walnut Creek Bridge 127
Proj . 416-C , Brooks County, Quitman to Thomasville- Bridge
Proj. 406-B , Grady County, Thomasville to Tallahassee Concrete 20 ft. 128
STATE HIGHWAY BOARD OF GEORGIA PROJECTS UNDER CONSTRUCTION DIVISION FIVE Types and Miles of Road
Graded Project Sand Gravel Number Clay and and
Top Soil Chert
Macadam
Base and Surface W. B. Treat-
Macadam ment
Lime Rock
Bitu- Bitu- Bit. Cone. Bit. Cone. Portland
minous minous NonRigid Rigid Cement Resur-
Mixture Macadam Base
Base Concrete :faced
282_- 325-A __
~ 325-D ___ _
347 __ 347-0_405-B_ 410-D __ 430-E ___ _ 431-0-
442 ____ _ 456 _____ _
456-B_ 467_ 474-A 474-B __
480_--
-
-- ---- ----- -----------
11.030
6.350
7.569 5.479
------ .. - - - - - - - - -
.117
8.779 5.618 6.563
7.459 4.221
7.220
----------- -------- {s\t.6i5
7.647 -----
2 ________ { Sh. ~-ss1,
Sh. Asp.
{
. 117
{ Sh. Asp.
----- ---------- --------
10.360
STATE HIGHWAY BOARD OF GEORGIA DIVISION FIVE-Continued Types and Miles of Road
Project Number
Graded Sand Gravel
Clay and and Top Soil Chert
Macadam Base and Surface
W.B. TreatMacadam ment
Lime Rock
Bitu- Bitu- Bit. Cone. Bit. Cone. Portland
ruinous ruinous NonRigid Rigid Cement Resur-
Mixture Macadam Base
Base Concrete faced
841 -- ---
841-B -- ---- -
912-B ---- ------- .. -
,__. w
1002-A_ --1002-B_ . --
----
8.276
0 1002-0---- 6.000
1006_- ---
.397
1015-A_ --- 9.627 1015-B __ -- 20.000
10.591
------ ---
-
--
Totals ____ 95.688 10.708 --
.086
---
- - - - - - - - - - - -
11.766
-- --------- ---
11.294
---- ----
------
---
- --
-- ----
- ------
------- -----
---
----- ---- ----
.769
----
---------
--
-----
---
--
------ --
--
--
-- - -
11.294 -------
----
{ Resur. 7.220
( Sh.Asp.
8.416 \ 29.844
Number of Projects __ Miles of Road ______ _
----------- 25 174.936
...... .c...:.>..
Proj. 346-A, Schley County- Bridge No.1 over Buck Creek
Proj . 415-C , Brooks County , Quitman to Thomasville- Bridge
Proj. 405-B, Grady County , Thomasville to Tallahassee Raised Edge and Sodded Shoulders 132
w.w.... State Route No. 30, Wheeler County- Bridge near Glenwood Raised and Widened
Proj. 76, Wheeler County- Ochwalkee Creek Bridge Widened 18 to 24ft'.
STATE HIGHWAY BOARD OF GEORGIA
PROJECTS UNDER CONSTRUCTION DIVISION SIX
Types and Miles of Road
Graded Project Sand Gravel Number Clay and and
Top Soil Chert
Macadam
Base and Surface W. B. Treat-
Macadam ment
8 ------ ----------- -------- ----------
76 _______ ---------- ---------- ----------
77 _______ ---------- ---------- ----------
77 _______ ---------- ---------- ----------
145 _______ ---------- ---------- ----------
149_______ ---------- ---------- ----------
.... 157_______ 7.196 ---------- ----------
?:;; 210-A __________________________________ _
.020
210-B ______________________________ _
210-0----- - -------- ---------212------- -.-.------ ---------- ---------226655--B- -__- _- _--__-_-_-_-_-_-_-_-_- _- _-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_- -. -_
287 _______ -----------------------------322 _______ --322-B ___________ _
355-S __ 369 ____ _
388-0.--388-D __ . 388-E __ ___________ . __ _
388-F_________________ ---- 388-H_____________________ _
410-E_____
.498 ___________________ _
431-D __________________________________ _
Lime Rock
Bitu- Bitu- Bit. Cone. Bit. Cone. Portland
minous minous Non Rigid Rigid Cement Resur
Mixture Macadam Base
Base Concrete faced
10.269 ----
. 153 - - - - - - - - - -
2.214 ------------------- 11.310
4.000 5.035
2.166 -4.052
7.436 -----1.444 ---------- ---------
3. 576 - -- - - - 12. 809 - -- - - - - -
2.626 8.932 5.162 5.072 12.819
6. 360 - -- - - - - - - -
5.330
7.845
9.910 5.720
STATE HIGHWAY BOARD OF GEORGIA
DIVISION SIX-Continued. Types and Miles of Road
Graded Project Sand Gravel Number Clay and and
Top Soil Chert
Macadam Base and Surface
W.B. Treat-
Macadam ment
Lime Rock
Bitu- Bitu- IBit. Cone. Bit. Cone. Portland
minous minous Non Rigid Rigid Cement Resur-
Mixture Macadam Base
Base Concrete faced
476-A_____ 4.977 ___________________ _ 476-B _____ ---------- ___________________ _ 481-A _______________________ .. __________ _
856828-A_-_-_-_-_-_- 175..560000 -_-_-_-_-_-_-_-_-_-__-_-_-_-_-_-_-_-_--_ 896_------ 2. 510 ---------- ---------~ 905-A_____ 6.000 ___________________ _ a> 905-C_____ 29.000 ___________________ _ 908-B_____ 8.010 ___________________ _ 908-B __________________________________ _ 926 .. ------ 7. 596 ---------- ----------
Totals ___ _ 88.887 ---------- ----------
10.630 ---------------------------------------------12. 376 - -- -- - -- - - - -- --- -- - - - - - - - -- -- - -- -- - - - - -- - -- - -
5.000 ---------- ---------- ---------- ---------- ---------- ----------
.020 83.671 27.058 ---------- ---------- -----
7.402 44.115
Number of Projects___________________ 36
Miles of Road _________________________ 251.153 Note:
Miles reported in the foregoing tables represent construction miles as distinguished from actual road miles. Construction miles, in some instances, may be duplicated, or even triplicated, owing to the nature of the project. A grading project may be completed, afterwards, the same mileage is added for an improved surface project. The Federal Bureau of Public Roads designates the latter mileage as "Stage Miles."
Road miles cover actual distances between terminals.
Proj. 145, Montgomery County Approach to Oconee Bridge near Mt. Vernon
Proj. 908-C, Coffee County Bridge over A. B. & C., West of Douglas
137
.. _ -- ...J! j :.. .:
Route 13.- Note Curbing- Hall County.
Route No. 11. Resurfacing.
--
Eng. Div.
1 2 3 4 5 6
No. of Proj.
47 48 32 40 25 36
SUMMARY OF PROJECTS PLACED UNDER
Graded
CONSTRUCTION Mac.
FOR
FISCAL
YEAR
ENDING
JUNEBi3t0. '
1931
Sand Gravel Base Surf.
Bit.
Cone. Bit.
w. Clay or or and Treat- Lime Mix- Bit. Sheet Non Cone.
Top Chert
B. ment Rock ture Mac. Asph. Rigid Rigid
Soil
Mac.
Base Base
---
PortLand Cement Cone.
Brick
Resurface
33.070 26.829 2.388 ---
114.332 11.309 18.830 27.463-
94.918 6.568 -------- 3.250
151.354 -------- -
-------
95.688 10.708
88.887
.020
5.914 8.280
11.908 --
-----
23.540 - .. -.
-------
9.050
32.408 --- --- -----
. ----- 12.742_
13.460 - ----- -------- -
- . ---
11.766 ---
11.294 29.844 --- -- --
83.671 27.058 ------- --------
---
-------
.074
-
29.65433.975 -------6.947 --76.345 2.500
8.416-
7.402-
97.96 6 6.85 0
7.22 0 44.11 5
228 578.249 55.414 21.218 30.733 141.305 56.512 19.574 29.844 33.700 .074 162.7391 2.500 156.151
CONSOLIDATED TABLE OF TYPES AND MILES OF
ROAD PLACED UNDER CONSTRUCTION-EACH DIVISION
~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~--
~
TYPE AND MILES OF ROADS
~~- I
I Division I Division I Division I Division I Division
Project One
Two Three Four
Five
Division Six
Total Each Type
Graded-Sand Clay-Top SoiL_
89
Gravel or Chert_________
11
Macadam Base or W. B. Macadam ___
4
Surface Treatment ___
6
Lime Rock ______ ----- --------
29
Bituminous Mixture_
-----
7
Bituminous Macadam ---- --------
3
Sheet Asphalt ___ ------------
4
Bituminous Concrete (Non Rigid Base) --
4
Bituminous Concrete (Rigid Base)_ - -- 1
Portland Cement Concrete_
43
Brick ____ ---- .. - .. --- ---Resurface _____________
-- - --
1
26
Totals-Each Division_
-- 228
33.070 114.332 94.918 151.354 95.688 88.887
26.829 2.388
--- ----
------
11.309
6.568
18.830 ---
27.463
3.250
32.408
-
---- -
---
13.460
10.708
-------
--
11.766
.020 83.671
5.914 23.540
27.058
8.280 ---
------ -----
11.294 29.844
11.908
9.050
--
-
---------
29.654 33.975
12.742 6.947
---------- -
.074 -------
76.345
8.416
7.402
---------- - -------- ---------
2.500
97.966
6.850 --- . ------ --------
- ---- ---
7.220
44.115
-----
216.009 245.349 156.833 243.733 174.936 251.153
578.249 55.414 21.218 30.733 141.305 56.512 19.574 29.844 33.70o
.074 162.739
2.5o0 156.151
1288.013
............
State Route No.8, Madison County, South of Daniels~ille-New and Old Bridge over South Fork
STATE HIGHWAY BOARD OF GEORGIA DIVISION NUMBER ONE-1930-31
CONSTRUCTION-DIVISION ONE-CARTERSVILLE, GA.
MILES AND TYPES OF ROADS-COMPLETED AND SETTLEMENT CLOSED JULY 1, 1930 THROUGH JUNE 30, 1931
Project Number
GSraadnedd I Clay Gravel
Top Soil Chert
Macadam Base and Surface
W. B. TreatMacadam ment
30-A_
_ -~~~~~~~~~ ~ ~~-~~~~~ ~~~~~~~~~
41-B_~~
~~~~~~~~~ ~~
ll8~--- -- ~~~~~~~~~~ ~~
ll9 --~
~~~~~~~~~~ ~~~~-
~~ ~~~~~~~
~ ~
224187-_A~---~ ~ -
---------4. 987
~--~ -~ --
-- ------
248-B ~ ~
4. 648 ~ ~ ~ _
26L ~ ~ ~ _ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
276~~-~~ -~~~~~~~~~ ~~~
289-B~ ~
.665 ~~~
331_~~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
358-A~~~--
~~~~~~
358-S_~~~~ ~~ --~~~~~ ~
4.851
392-B~~~~
392-H
394-B~ ~~
394-0~ ~--
394-D ~
413-A_
422-A_ ~
422-B~
422-0
2.530
Miles of Road
Lime Rock
Bituminous Mixture
Bit. Cone. Bitu- Bit. Cone. Rigid Portland minous Non Rigid Base Cement Macadam Base (Cone.) Concrete
Resurfaced
3.610 ~~
7.867 . 612 - ~ ~ ~---- ~ ~ I 2.800 7.810 2.228
3.020 ~~~~~
4:85i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~
3.740 ---~~~---
.806 6.259
--!-----------1---
--I-~ -----~~I_
8.159
5.820
16.760 4.980 4.832
6.383 1.048 2.326 10.796
Athens-Macon, North of Madison Bridge over C. of Ga. and Ga. Railroads
Proj . 231, Hart County- Concrete Arch Widened 143
STATE HIGHWAY BOARD OF GEORGIA DIVISION NUMBER ONE-1930--31
CONSTRUCTION-DIVISION ONE-CARTERSVILLE, GA.-Continued.
MILES AND TYPES OF ROADS-COMPLETED AND SETTLEMENT CLOSED JULY 1, 1930 THROUGH JUNE 30, 1931
Miles of Road
Graded Project Sand Number Clay
Top Soil
Gravel Chert
Macadam
Base and Surface W. B. Treat-
Macadam ment
Lime Rock
Bit. Cone. Bitu- Bitu- Bit. Cone. Rigid Portland
minous ruinous Non Rigid Base Cement ResurMixture Macadam Base (Cone.) Concrete faced
- - - ------------------ ------------- ------1----1-------------- - - - - - - -
422-D __
-
4.409
424-0_-
8.721
t.....
462-A_ .. 464-
12.126
8.187
806-B _________ _
5.188
972 ___ _
6.765
986-A..
___________________ _
7.128
986-B __ _ ________ _ __ -.------
10.278
988-B ________ _
4.098
990-A ___ _ 990-B __ _
4.440
! I.---
6.950
991-B _____________ _ 1.311
992-B. _
9.945
9.945
995
3.400
998-B_
1.212
999-0_-
1. 800
1037 Totals_
-37."-91_2___15--o3_7_ --18-.196 --2-.5-301____ -~~~3;181~~~"206 ~:~~--~-~~- --16.~l-79.2os-
Total projects completed. Same Proj. number 39, Actual Proj. 44 Total miles of road completed____________ ______________ 228.226
Project 382, Stephens County- Concrete 145
STATE HIGHWAY BOARD OF GEORGIA DIVISION NUMBER TW0--1930-31
CONSTRUCTION-DIVISION TWO-GAINESVILLE, GA.
MILES AND TYPES OF ROADS-COMPLETED AND SETTLEMENT CLOSED JULY 1, 1930 THROUGH JUNE 30, 19.3_1_ - ~
Graded Project Sand Number Clay
Top Soil
Gravel Chert
Macadam Base and Surface
W.B. Treat-
Macadam ment
56 __
68 __
83 ~- ---111-A __
131__~---
153-B --- -- ---
220-A_
-- -------
222-A
1.136
227-B ~ 245 ____
284~---
285 __ 308 ___
.558
--------
310___ ---
312 ----327 ____
328__ --
372-B 400-0_
----------
-.
--
~
----------
2.941
-----
------
------------- -----
----------------
---
I
Miles of Road
Lime Rock
Bituminous Mixture
6 630
Bit. Cone. Bitu- Bit. Cone. Rigid Portland minous NonRigid Base Cement ResurMacadam Base (Cone.) Concrete faced
----
---r------
11.626
--
7.290
.508
I 6.942
4.777
--------
------
8.686
----
------
3.692
6~858
---------
3.440 2.920
--
.070
2.672
4.485 10.774
' 10.930
I
State Route No. 53, Pickens County-Paving between Jasper and Fairmount
STATE mGHWAY BOARD OF GEORGIA
DIVISION NUMBER TW0-1930--31 CONSTRUCTION-DIVISION TWO-GAINESVILLE, GA.-Continued.
MILES AND TYPES OF ROADS-COMPLETED AND SETTLEMENT CLOSED JULY 1, 1930 THROUGH JUNE 30, 1931
Miles of Road
Graded Project Sand Number Clay
Top Soil
Gravel Chert
Macadam
Base and Surface W. B. Treat-
Macadam ment
Lime Rock
Bit. Cone.
Bitu- Bitu- Bit. Cone. Rigid Portland minous minous Non Rigid Base Cement ResurMixture Macadam Base (Cone.) Concrete faced
----1----1-----1---- ----1----1-----1----1-----1----:-----1---
402-A ___ . ________ _
.795
402-E__- - -
1. 050
411. ______ -------423-A ________ _
~ 423-B ___________ _
423-D. ___ _
448-C ___ _
459 __ .
8.724
-- :: I-
I 15.994
3.762 2.211
.242
-,I 4.285
964-C_.
5.701
967-B 979-B 98L _
982 __
10.768 3.012 12.225
9.349 2.925- ----- -:-i
----------1----1-----l----~----1----
Totals
38.201
9.349
2.925
---1 23.540 20.350
22.936
4.777 56.710
Total Projects completed. Same Proj. Number 32, Actual Proj. 33
Total Miles of Road Completed
_178.888
Between Marietta and Canton- Bridge over Noonday Creek Old Bridge in Foreground
Proj. 41-A, Lithia Springs- Concrete Road 149
STATE HIGHWAY BOARD OF GEORGIA
DIVISION NUMBER THREE-1930-31
CONSTRUCTION-DIVISION THREE-THOMASTON, GA.
MILES AND TYPES OF ROADS-COMPLETED AND SETTLEMENT CLOSED
==c===========~ JU~ LY~1~ , 1~ 930~T~ HR~O~ UG~ H~ JU~ NE=3= 0, = 193= 1 ====--=---- - - - -
I I I I -=--~~--------~--~-------------M~il~es~of__R~o~ad _______________
Project G~:~~d
I~:~:~~~ Surface
Bitu- Bitu- !Bit. Conc. 1 Biii~f~c Portland I
Number Clay Gravel W. B. Treat- Lime minous minous Non Rigid I Base Cement Resur-
Top Soil Chert Macadam Il'.ent
1-A
I
-'----------------
Rock Mhture Macada'l', Base
I . ----
(Cone.) Concrete faced ---~:___ _ _2c-.-c-19""'7~------
17-A_ I
17-E __ _
0""
~6t~- 144-A_
243
~-I'---
s2s5o9_-A_ I
I
-1
I
_547
16.252 .909
4.573 I
6.59o I
401-0_
!~~=~-
!HI
3.::46 _
;:~; 1 I
1
...... 1
.47_2__ ]_
I
__
1
I
966 II
12.742
970-A
5 326
~~t~ :~~- - - 1~ 974-B -
3 324
I
I
I
:_1: Totals_ --
2I5-3S--62676~--:--:---- -
I-
I
--_----l-----r5093 ---
------
_ __
___13.2531_-_ _--- -_--
13.353 I 12."742
Total Projects completed. Same Proj. Number 20, Actual Proj. 21
Total Miles of Road__
____________ 103.461
33.464 I
Proj . 949, Lee County, Leesburg to Albany Surface Treated Limerock
lProj. 949 , Lee County, Leesburg to Albany Surface Treated Limerock 151
STATE HIGHWAY BOARD OF GEORGIA
DIVISION NUMBER FOUR-1930--31 CONSTRUCTION-DIVISION FOUR-LOUISVILLE, GA.
MILES AND TYPES OF ROADS-COMPLETED AND SETTLEMENT CLOSED JULY 1, 1930 THROUGH JUNE 30, 1931
Miles of Road
Project Gs!~~d I
I ~!~!~~d I Surface I
I Bitu- I Bitu- IBit. Conc.IBi}ti~fJc.l Portland I Resur-
Number Clay Gravel W. B. Treat- Lime minous minous NonRigid Base Cement faced
Top Soil Chert Macadam ment Rock Mixture Macadam Base (Cone.) Concrete
29-B _____ __________ __________ __________ __________ __________ __________ __________
_ __ ________ 6 . 841 ________ _
112_______ ----------
172-A ___ __
. 665
-- ---------- ---------- ---------- ---------- ---------- ----------
.287
__________ __________ ___ ______ __________ __________ __________ __________ ____ _____ ___ . _
172-B ____ 9 .128
__ __________ __________ ___ ______ __________ __________ __________ ______________________ . __
34L___ ___ ___ __ ___ __ ___ __ _____ _____ _____
3.410 _________ _ __________ _____ _ _______________ _
409-C- - - -
.289 - - - - - -- -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - -- - - - - - - -
- - - - - - - - - - - -
439-A____ __________ __________ __________ __________
.647 __________ __________ _____
________________ _
~ 446-A_ ___ __________ 13.521 ______________________________________________________________________________ _
465-A_ ___ ____ _____ _ _________ _ ___ _______ _________ _ __________ ___ __ __ __ _ __________ ___
_______ __ 13.017
466-A____ __________ __________ __________ __________ __________ __________ __________
_________ 16.717 _
475-B_ ___ 7.840 _________________________________________________________________________________ _
640_______ 9.800 ---------- ---------- ---------- ---------- ---------- ---------- ------ --- ---------- ---------- -----
925 ____ --- 9. 738 ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ----------
927_______ ---------- ---------- ---------- ---------- ---------- ---------- ---------- ----------
.074 ---------- -------- -
939_______ 2.214 ---------- ---------- ---------- ---------- --------- ---------- ---------- ----------
- ----------
942_______ 1.340 ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ----------
953 _______ ------------------------------ ---------- 2.302 -- ------ ----------------------------------------
954_______ 5.903 -------------------- ----------------------------------------------------------------------
955____ --- ---------- ---------- ---------- ---------- ---------- 5.001 ---------- ---------- ---------- ---------- ----------
958_______ 1.566 -------------------964-B ____ 14.350 __________ __________
--- ----------
------------ ---------- ---------- ---- ------
__________ __________ ____
___________________ _
968-B____ 9.734 __________ __________
____ __________ _
______________________ _
Totals_ _ 72 .567
13.521 -----
6.359
5.001
Total Projects Completed_______ ___ 22 Total Miles of Road Completed ________ 134.384
.074 36.862
Proj. 229, Bulloch County- Route One
Proj. 472-B , Burke County Bridge over Walnut Creek Raised and Widened
153
STATE HIGHWAY BOARD OF GEORGIA DIVISION NUMBER FIVE-1930-31
CONSTRUCTION-DIVISION FIVE-MOULTRIE, GA.
MILES AND TYPES OF ROADS-COMPLETED AND SETTLEMENT CLOSED JULY 1, 1930 THROUGH JUNE 30, 1931
Miles of Road
Project GSraadnedd
MBaasceadaanmd Surface
I Bitu- I Bitu- Bit. Cone. BiRt.iCgiodnc.l Portland I
Number Clay Gravel W. B. Treat- Lime minous , minous Non Rigid Base Cement 1 Resur-
----I Top Soil Chert Macadam ment
Rock Mixture I Macadam Base
(Cone.) 1 , Conc~ete faced
:a~ = := :, ------= : - I i ~; ) ::: ,_. 405-B____ _I7i.6"4"1 __________ __________ _________ !_____5__6_5_5_ ,____________________ ,______ -- ---------~ --------- ----------
~ 405-B____ __________ __________ __________ ___________________ :__________ ______ 1--------- ----------~ 7.647 _________ _
415-0---- ---------- ---------- ---------- --------- ---------- --------- 1---------- --------- ---------
4' 713 ---- -----
429-E_____ 8.179 _______________________________________ ,_________ :-------- _ __________ _________ __________________ _
430-0- - -- 2. 557 ----- ----- - -- --- --- - --- -- --- - -- -- - -- - - - - - -- -- - - - - - - - - - -- - - - - - - - - - -
----- ---- -- ------- -
456_______ ----------
.117 ---------- --------- ---------- --------- --------- --------- --------- --------- ----------
446870_-A__________
_____8_. _7_7_9_
----5--.3-2-6--
-_-__-_-_-_-_-_-_-_-
'---------- ---------- --------! _____________________________
--------- -----------------,---------
--------- ---------___________________________ _
480-B____ __________ 5.963 __________ __________ __________
_________ _______
__________________ _
984111_-B__________ -__-_-_-_-_-_-_-_-_-----1-1-.0-1-5---_-_-_-_-_-_-__-_-_- _-_-_-_-_-_-_-_-_-_--_-_-_------- --__-_-_-_-_-_-_-_- __-_-_-_-_-_-_-_-_--_-_-_-_-_-__-_-_- -_-_-_-_-_-_-_-_-_______.7_6_9___-_-_-_-_-_-_-_-_--_
i~:Bt_a_~:~~
---~:-;~;-
===~~=~~~=~~~-~~~~~=-~
!,~~~--~~-=-~~--
5-
-:~:~~-=~~~~-~~~:~,-------------------1-------------------;I-
=========
---------
-:=~~-~~5=~~~------~~
Total Projects completed. Same Proj. Number 15, Actual Proj. 16 Total Miles of Road Completed______________________________ 88.843
Route No.3 , Thomasville to Talahassee- Concrete
Proj . 406-B, Grady County, Thomasville to Tallahassee Ga.-Fla. State Line Marker 155
STATE HIGHWAY BOARD OF GEORGIA
DIVISION NUMBER SIX-1930--31 CONSTRUCTION-DIVISION SIX-WAYCROSS, GA. MILES AND TYPES OF ROADS-COMPLETED AND SETTLEMENT CLOSED
JULY 1, 1930 THROUGH JUNE 30, 1931
Project Number
Graded Sand Clay
Top Soil
---~- ---~
Gravel Chert
Macadam Base and Surface
W.B. Treat-
Macadam ment
Miles of Road
Lime Rock
Bituminous Mixture
Bit. Cone. Bitu- Bit. Cone. Rigid Portland minous NonRigid Base Cement ResurMacadam Base (Cone.) Concrete faced
- - - - --
388-A 388-D
-------
9.070 -8.932
388-D 388-G 410-0
410-D
7.839
------
6.144 6.902
---------- ----------
4.611
- -------
410-E_
.498
427-B 907-E__
----------
5.875
908-B __
8.010
919_ - - - - - - - - - - - - - -
- -------
----- --
11.071
-------
-----
--.
14.360
-- - --r-
Totals -
35.268 ---------- ----
14.360 33.684 ----
-- - -
I
Total Projects completed. Same Proj. Number 10, Actual Proj. 12
Total Miles of Road ______ _
----- -- 83.312
- - - - - --
I
---
I
I
Proj. 333, Bryan County- Concrete Paving
Proj. 388-A, Brantley County- Lime Rock Paving 157
Eng. Div.
1 2 3 4 5 6
No. of Proj.
27 21 13 18 11 8
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF COMPLETED PROJECTS-JUNE 30, 1931
Types and Miles of Roads Completed from Previous Periods.
- - --
As-
Mac.
phalt Bit.
Graded
Base
Bitu- Bitu- and Cone.
Sand
and Surface
ruinous ruinous Sheet Non Bit. Cone. Portland Resur-
Clay Gravel W. B. Treat- Lime Mix- Mac- As- Rigid Rigid Cement face all
Top Soil Chert Mac. ment Rock ture adam phalt Base Base Concrete Types
-------- ----- -----
27.612 5.751 18.196 2.530
39.181 --
35.360 -------- -------- -------
---
20.350
11.896
6.276 13.941 ------ --------
13.353
53.587 13.521 ----
-- ---- 6.359 5.001
20.880 22.304 -------- ------
5.958
26.760
14.360 24.752
12.078 22 936
4 777
16.054
I 41.668 33.464 36 862
i 11 2591
40.785 -
All ----
98
176.095 47.852 18.196 16.890 51.010 5.001 72.884
1350141--47771-139-407 ---4o-785
-
---~------
Typrs and Miles of Roads Completed from Current Period.
1 2 3 4 5 6
All. __
17
10.300 9.286
7.128
.907 38.418
12
2.941
9. 349 2. 925
23.540
15.042
8
9.637
2.152
12.742
4
18.980
.074
5
19.809 .117
8.416
4
8.508
8.932
- - - - - - - - - - - ----1----1----1----1----1---~
--~
-~--
------
---------
--
50
70.175 9. 403 9.349 2. 925 11.084 23.540
7.128 12.816 24.365 I 38.418
Total Completed During Fiscal Year Ending June 30, 1931
A1L ... I 148
246.270 [57.255127.545[19.815162.094[28.541 [72.884[--------[42.142 I 17.5931 163.7721 79.203
Proj. 4.64,Cobb County, Little Nconday Creek and Church in Distance. June 1931
Proj . G-1-29, Chattooga County, between Summerville and Rome 159
STATE HIGHWAY BOARD OF GEORGIA CONSOLIDATED REPORT OF MILEAGE CONSTRUCTED, SHOWING TYPES-ALL DIVISIONS
JULY 1, 1~3) THROUGH JUNE 30, 1931
Type and Miles
Division Division Division Division Division Division
Total
One
Two
Three
Four
Five
Six
----~-------------~------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Graded, Sand Clay or Top SoiL
37.912
Gravel or Chert __
15.037
Macadam Base or W. B. Macadam _
18.196
Surface Treatment
2.530
Lime Rock __ ~
Bituminous Mixture_
.....
0>
Bituminous Macadam_ Bit. Cone. (Non Rigid Base)_
0 Bit. Cone. (Rigid Base)
39' 181 19.206
---- ---
Portland Cement Concrete__
16.961
Resurfaced ___
79.203
Totals _____
----------
228.226
38.301
9.349 2.925
----------
23.540 20.250 22.936 4.777 56' 710
---- ----
178.888
21.533
72.567
40.689
35.268
246.270
6.276
13.521
22.421
57.255
--------- -------- --- ------- ---
14.360
27.545 19.815
16.093
6.359
5.958
33.684
62.094
5.001
28.541
13.353
72.884
12.742
54.884
.074
4.851
33.464
36.862
19.775
163.772
------------
79.203
- - - - ------
103.461
134.384
88.843
83.312
817.114
Note:
By deducting Graded, Sand Clay, Top Soil roads, we have left 588.888 miles of semi-hard and hard surface roads of which 223.507 miles are different types of concrete.
Mileage completed means project miles completed and closed, in preceding tables, and includes projects brought into this period and closed as well as projects closed which orginated during the fiscal year. Numbers of projects were in the last stages of construction, some needing approval of final estimates and others only awaiting remittance to cover final estimates to close the project: all of these are listed projects under construction.
BRIDGE DEPARTMENT
FISCAL YEAR JULY 1, 1930 TO JUNE 30, 1931.
During this fiscal year steady progress has been made in the construction of bridges of various types, spanning the streams and rivers of Georgia. On account of relocation, a number of old bridges have been replaced, with new structures, and weak structures have been reconstructed, to provide safer crossings for the present day traffic.
The character of motor transportation has changed amazingly during the past few years, and with the advent of the modern buses and heavy freight carrying truck units, the location, design and construction of roads and bridges have been materially affected. Whereas a few years ago a bridge with an eighteen foot roadway was entirely adequate to carry vehicles in use at the time, operating at speeds rarely exceeding thirty-five miles an hour, the present day automobiles and trucks operating at considerably faster speeds have made these bridges of eighteen foot width entirely inadequate and in some instances dangerous. Even though structurally these bridges could serve traffic for many years, it has been necessary for the sake of safety to widen or entirely reconstruct a number of them, particularly those of comparatively short lengths.
A tabulation shown in another section of this report indicates that bridge structures on which final estimates have been passed during this year amount to 109 bridges on 58 projects, aggregating 3.89 miles, built at an approximate cost of $1,250,000.00.
A few of the major projects completed and under construction are described concisely as follows:
COMPLETED
Project G-4-68, Lincoln-Columbia Counties: This bridge is on Route 47, between Appling and Lincolnton, and replaces an old light steel truss bridge over Little River which was washed out by flood. The new bridge is 732' long, consisting of creosoted timber pile substructure, with I-beams and timber floor, 18' roadway. Cost approximately $32,000.00.
Project G-4-84 B, Jefferson County: This project consists of three bridges aggregating 900' long, on Route 24, between Louisville and Sandersville, over the Ogeechee River. Bridges consist of creosoted timber pile substructure, with I-beams and concrete floor, with 22' roadway. Approximate cost $39,300.00.
Project 253, Clarke-Oconee Counties: This bridge is on Route 15, between Athens and Watkinsville, over Barbers Creek.
161
Bridge replaces old covered timber lattice truss, and is 338' long, consisting of high concrete bents with !-beams and concrete floor, with 22' roadway. The main stream spans are 60'-90'-60' cantilever 1-beam with suspended center span. Approximate cost $32,000.00.
Project 41 0-C, Berrien-Atkinson Counties: This project consists of 5 bridges over the Alapaha and Withlacoochee Rivers, aggregating 2185', on Route 50 between Alapaha and Pearson, with roadways of 22'. The bridges are creosoted timber piles with !-beams and concrete floor. Approximate cost $85,000.00.
Project 127, Richmond County: This project was handled entirely by the State Highway Department of South Carolina, and consists of replacing a portion of the western approach of the Sand Bar Ferry Bridge, over the Savannah River on Route 52, damaged by the 1929 flood. The construction consisted of steel deck trusses with concrete floor on concrete piers. Length of replacement 394' with 18' roadway.
Actual cost of all completed bridge projects is included in construction section of Accounting Department.
UNDER CONSTRUCTION
Flood Relief Project No. 4 (322-A), Pierce-Wayne Counties: This project is on Route 38, between Blackshear and Jesup, and consists of replacing four bridges over Satilla River, one of which includes raising a 100' steel truss. Bridges consist of creosoted timber pile substructure with I-beams and concrete floor, with 22' roadway. Total length of four bridges 1440'. Approximate cost $50,000.00.
Project 138-B, Warren-Hancock Counties: This bridge is on Route 16, between Sparta and Warrenton, over the Ogeechee River, and replaces an old light steel truss. Bridge is 460' long and consists of creosoted timber pile bents, with two concrete bents as substructure, and I -beams with concrete floor, affording a 22' roadway. The main river spans are 60'-90'-60' cantilever !-beams with suspended center span. Approximate cost $20,000.00.
Project 220-D, Hall County: This project is on Route 11, between Gainesville and Cleveland, and consists of two bridges over the Chattahoochee River, with one ISO' steel truss, the remainder being concrete girders. Width of roadway 20'. A third concrete bridge is over East Little River and has a 24' roadway. The total length of bridges is 952'. Approximate cost $71,000.00.
162
Project 296-C, Wilkes-McDuffie Counties: 1'his bridge is on Route 10, between Washington and Thomson, over the Little River and replaces an old light steel truss. This bridge is 450' long with a 22' roadway, and consists of high concrete piers and bents, with I-beams and concrete floor. The main river spans are 60'-90'-60' cantilever 1-beams with suspended center span. Approximate cost $32,300.00.
Projects 444-A&B, Oconee-Morgan Counties: 'fhese projects are on Route 24, between Watkinsville and Madison. The bridge at the county line over the Apalachee River is a concrete cantilever 371' long. There are two concrete girder bridges in Morgan County, aggregating 614'. Width of roadway on three bridges 24'. Approximate cost $73,400.00.
DESIGN
The Designing Division of the Bridge Department completed designs on 88 projects, including 124 bridge structures, at an estimated cost of approximately $1 ,500,000.00.
In addition to the above, a number of grade separation structures have been laid out tentatively, and also preliminary layouts have been made for numerous structures. At the present time, work is in progress revising and redrafting standards covering all sizes of culverts.
The following Tabulation indicates bridges completely designed:
Length Concrete Bridges................. 9,220 Lin. Ft. Timber and 1-beam Bridges ....... 14,413 Lin. Ft.
Total. . . . . . . . . . . . . . . . . . . . . 23,633 Lin. Ft. 4.48 miles.
The amount of salaries and General Office expense represents approximately 1.1% of the total estimated cost of structures designed.
At the present time, a general recheck of the census and safe load rating of all bridges on the State System is being done. This census will include the new road mileage added to the system.
PAINT
On June 9, 1930, a bridge paint crew was organized for repainting the steel structures on the State System. This crew operated until January 31, 1931, and covered structures located
163
in the northwest and southwest portions of the State. The bridges were cleaned with sand blast and painted with an air gun. Red lead was used as a prime coat and black graphite as finish coat. Rails were painted aluminum.
Thirteen bridges were painted, aggregating in length 3,429 lineal feet, at an average cost of approximately $3.30 per lineal foot of bridge.
The following amounts of paint were used: 5,650 Lbs. Red Lead Paste. 1,450 Gals. Black Graphite. 3,500 Lbs. Iron Oxide. 1,750 Lbs. Magnesium Silicate. 38 Gals. Turpentine. 61 Gals. Varnish Vehicle for Aluminum. 105 Lbs. Aluminum Powder. 26 Gals. White Lead. 25 Gals. Japan Dryer. 550 Gals. Linseed Oil.
164
Federal Route No . 4, Pierce-Wayne Counties between Waycross and Jesup-Graded aud Ditch
Proj. 452-S , Jenkins County, near Millen Cypress Timber Bridge 165
STATE HIGHWAY BOARD OF GEORGIA
BRIDGE STRUCTURES COMPLETED FISCAL YEAR ENDING JUNE 30, 1931. Type and Length of Bridges
Division No.
1 1 1 1 1 1 1 1
Project No.
394 413 424 462 986 992 992 995
Timber or Timber
Concrete
I Structural Steel
and I Beams
No. of Length No. of I Length No. of I Length
Bridges Miles I Bridges Miles Bridges Miles
Masonry
No. of I Length
Struct. Miles
- ------ ---------- ----------
----------
3
.114
------- --
-----------
2
9
.147
--- ----------
.011
---------
2
.009
1
.033
------ ---
5
.103 ---------- --
1
.014
Total
No. of Length Bridges I in Miles
1
-
3
.114
2
.011
9
.147
2
.009
1
.033
5
.103
1
.014
d;
8
2
.033
20
.387
2
.011
24
.431
~ -~-----l-------l--------~-----l--------l--------l-------l--------l-------l--------l-------l~--------
2
56
1
. 017
----------
1
. 017
2
~
2
.00
2
.00
2
109
---------- -----
1
.020
1
.020
2
308
- --------
1
.013
- --------- ----------
1
.013
2
398
1
.004
1
.004
2
402
2
.092
2
.092
2
411
2
.017
2
.017
2
449
1
.026 ---------
--- --- --
1
.026
2
468
3
.125
----------
3
.125
2
798
1
.027
1
.027
2
964
1
.004
1
.004
2
979
----------
1
.019
----- ---
1
.019
2
982 ---------- ----- ----
5
.099
5
.099
2
983
1
.055 ---------- -----------
---------
1
.055
14
2
.072
20
.471
1
.020
---------
23
.563
STATE mGHWAY BOARD OF GEORGIA BRIDGE STRUCTURES COMPLETED FISCAL YEAR ENDING JUNE 30, 1931.-Cont'd.
Type and Length of Bridges
Division No.
Project No.
Timber or Timber and I Beams
No. of Length Bridges Miles
Concrete No. of Length
Bridges I Miles
Structural Steel
I No. of Length
Bridges Miles
Masonry No. of Length
Struct. I Miles
Total No. of 1 Length Bridges in Miles
3
3
3
3
3
3
3
..,~
00
3
4
4 4 4 4
4 4 4
4 4 4
4
4
1 436 934 936 938 974 976 977
8
127 141 409 446 472 475 925 939 942 954 957 960 968
1
.025
1
.053
1
.033
1
.048
1
.028
- -------
1
.013
---------
1
.031
3
.123
- - - - - - - - - - - -
---------
- ---------
7
.242
3
.112
---------
----------
.097
---------
------- -
---- -----
1
.017
1
.014 ------ --- ---------.
--------- .. . --------
3
.169
2
.022
-- - -- ..
3
.062
2
.181
.027
.008
-- --------
1 3
.005 .045
--------- ------------ -----
---------
---- ----------
----------
---------
13
9
.279
11
.368
-- -----
1
1
.025
1
.053
1
.033
1
.048
1
.028
1
.013
1
.031
3
.123
10
.354
1
.097
1
- - - - - - - - -
1
.017
1
.014
3
.169
2
.022
3
.062
2
.181
1
.027
1
.008
1
1
.005
3
.045
-----
21
.647
Division No.
STATE HIGHWAY BOARD OF GEORGIA
BRIDGE STRUCTURES COMPLETED FISCAL YEAR ENDING JUNE 30, 1931.-Cont'd.
Type and Length of Bridges
-
--
-
Project No.
Timber or Timber and I Beams
No. of Length Bridges Miles
----
Concrete
Structural Steel
Masonry
I
I
I
I
Total
No. of Length No. of Length No. of Length No. of Length
Bridges Miles Bridges Miles Struct. Miles Bridges in Miles
- - - - - - - - - - - - - - - ----~--
- - - - - - - - - --~~-~
5
5
5
5
.....
5
"00'
5
5
5
5
209
-----
1
405
---
1
415 --
-----
1
429
1
429
2
467
480
-------
911
- --
952
4
.049 1 1 2
.082
-----
9
6
.131
8
.014 .006 .051
.006
---- ----
- - - - - - - -
--- -
--
.049 .036 .038
-------------- ----------
----
- -
.200
--.
1
.014
1
.006
1
.051
1
.006
2
.049
1
.049
1
.036
2
.038
4
.082
14
.331
---
--------- ----
----- - -
6
388
6
388
-----
6
410
-------
6
410
6
748
1
6
907
9
6
10
I
.014 1.082
1.096
1
.008
1
.046
1
.079
4
.334
----- - - -
7
.467
-
--
1
.008
1
.046
1
.079
4
.334
1
.014
9
1.082
- - - - ------ ------
17
1.563
Proj. G-4-99, State Route No. 24, Burke County Between Waynesboro and Louisville
Proj. 346-A, Schley County- Bridge No.2 over Buck Creek 169
STATE HIGHWAY BOARD OF GEORGIA BRIDGE STRUCTURES COMPLETED FISCAL YEAR ENDING JUNE 30, 1931.-Cont'd.
RECAPITULATION Type and Length of Bridges
Division No.
Project No.
Timber or Timber and I Beams
I
Concrete
I Structural Steel
I
Masonry
I
Total
No. of Length No. of Length No. of Length No. of Length No. of Length Bridges Miles Bridges Miles Bridges Miles Struct. Miles Bridges in Miles
1
8
2
.033
20
.387
2
.011 ---
2
14
2
.072
20
.471
1
.020 --
3
8
7
.242
3
.112 ---------- ----------- -
4
13
9
.279
11
.368 -- ----
1
5
9
6
.131
8
.200
--
6
6
10
1.096
7
.467 --------
58
36
1.853
69
2.005
3
.031
1
24
.431
23
.563
10
.354
21
.647
14
.331
17
1.563
----
109
3.889
..... .~ ....
Route 2.- Union Co.- Blairsville- Blue Ridge. Culvert:b:v Statell'orces,
Route 32, Coffee Co., Red Pebble Base. State Forces.
STATE FORCES
CONVICT DEPARTMENT.
The State Highway Board of Georgia began the use of some convict labor on small State Aid grading projects during the year 1923. These units were operated under the direct supervision of the Division Engineer in whose division the construction was being done.
On July 1, 1930, the Department consisted of three units, or camps, engaged in grading and drainage on Projects A-947 Stewart, A-984 Union, A-933 and A-997 in Murray County.
On this date the Highway Board determined that, in order to concentrate all activities of these outfits, it would be preferable to merge all State Forces and place them under the supervision of one department head. This consolidation prevents the duplication of reports and other duties, and enables the Department to make purchase of supplies and materials in such quanti~ies that far more reasonable prices are to be had than otherwise.
These units operate and carry on grading, culvert and bridge construction in a like manner as do contractors, and all construction is under the same Engineering supervision as contract projects. Estimates or units of work are established and set up by the Engineering Department at a definite unit price. Records are kept by the Engineer in charge of these forces which show the actual unit cos. as compared to the estimated cost. These costs have compared very favorably with contract prices.
To date this Department has successfully handled various grading, culvert, bridge and rock crushing projects to meet all requirements and to the satisfaction of the Engineers in charge. Some bridge projects have been somewhat large and difficult.
It is believed that when these outfits are properly equipped they will be able to reduce construction cost very materially
ASPHALT DEPARTMENT.
This Department, as was reported in 1930, consists of three units, each under the supervision of a Superintendent with practically the same personnel and equipment. These outfits, by shifting to the southern and middle portion of the State, have been able to operate either in building up base work or in surfacing and resurfacing the entire year. Records show that all work done by this Department has been accomplished at a very reasonable cost.
173
Route 32.- Between Ocilla and Douglas. State Forces.
STATE HIGHWAY BOARD OF GEORGIA PROJECTS COMPLETED FISCAL YEAR ENDING JUNE 30, 1931.
ASPHALT DEPARTMENT
co_u_n_~--- Project No. I ___
----- :_p_e------1-M-i-le_s_
A-118 _________ Fannin._
Retread__
2. 8
A-118 _________ Fannin_ .. _ . ________ 2" Penetration___
3. 6
A-119 __________ Pickens ____________ Retread_________
7.8
A-263 _____ Walker___
ReseaL___________
5.9
A-263_ _ __ -~Walker_
2" Penetration___
2. 9
A-276 _________ Fannin _
Retread_________
3.0
A-33L _______ C?er~kee
Retread____________________ 5.8
A-358-A___ F.mmn__________ 3" Penetration_____________ 2.5
A-358-S _______ Fannin ____________ 3" Penetration__________
4. 8
A-392-ACD&S Pickens ___________ ReseaL_________________
1.6
A-392-ACD&S Pickens ____________ 2" Penetration.______
3.2
A-392-B _______ Pickens ____________ Surface Treatment
3.7
A-394 _________ Whitfield ___________ ReseaL_______ ___
4.4
A-394-B _______ Whitfield ___________ ReseaL__________
4. 7
A-394-C _______ Catoosa____
ReseaL___________
3.9
A-41L ________ DeKalb ____________ Retread__________
7.5
A-41L ________ DeKalb ____________ H" Penetration___
l. 2
A-413-A _______ Bartow____________ 7/8" Cold Mix Top__
6. 4
A-422-B _______ Gordon ___________ ReseaL._________
2.3
A-422-C _______ Gordon_ . __________ ReseaL__ __
10. 8
A-422-D ______ JWhitfield __________ ReseaL________ ______ __
4.0
A-982 _________ Dawson___________ 2" Penetration_
2. 9
A-992-A _______ Pickens_________ 2" Penetration__
8. 9
A-992-B _______ Pickens. ___________ 2" Penetration______
1.0
A-995 _________ Fannin ____________ 2]" Penetration__ _________ 3.4
A-998-A _______ Fannin ____________ 3" Penetration.
1.2
A-998-B _______ Fannin_______
3" Penetration. ___
1.2
A-999-C _____ Bartow _____________ 7/8" Cold Mix Top__
1.8
PROJECTS UNDER CONSTRUCTION JUNE 30, 1931. ASPHALT DEPARTMENT
A-418-A&B_ ___ Monroe___ ________ 6" Limerock and Surf. Tr.__
A-908-A&B_ ___ Coffee ___ .
6" Limerock and Surf. Tr.__
A-912-B _______ Irwin_______
2" Penetration_____________
A-938 _________ Houston ___________ 8" Limerock and Surf. Tr.__
A-945-A _______ Peach______
8" Limerock and Surf. Tr.__
A-945-B _______ Peach _____________ 6" Limerock and Surf. Tr.__
6.87
5.00 11.30
4.50 6.75 3.98
175
Proj. G-2-33, Union County- Finishing Bridge by Convicts
Proj . G-1-18, Whitfield County- Bridge Mill Creek Convict Built 176
Proj. G-1-19, Fannin County- Surfaced by State Forces
STATE HIGHWAY BOARD OF GEORGIA PROJECTS UNDER CONSTRUCTION FISCAL YEAR ENDING
JUNE 30, 1931. CONVICT DEPARTMENT
Project No.
County
Type
Miles
A-947-A ______ Stewart_ __________ _ Grading and Drainage_____ 10.84
A-947-B _______ Stewart_ __________ _ Grading and Drainage_ ____ 5. 61
A-806-A&O__ Whitfield ___ _
Bridges ___________________________ _
A-997-E ______ .,Murray____________ _ Bridge ___ .. ________________________ _
A-993-D _______ Murray ____________ _ Bridge ____________________ _
A-984 _________ Union _____________ _ Grading and Drainage_ ____ 10.20
A-989 _________ Fannin ____________ _ Water Bound Macadam_____ 4.88
A-1023 ________ Fannin _____________ Grading and Water Bound
Macadam_________________ 2. 38
A-984 _________ Union ____________ _ Water Bound Macadam_____ 4.88
Note: ProJects listed in above activities of Convict and Asphalt forces are included in general construction tables on the foregoing pages.
178
Proj. G-2-33, Union County, West of Blairsville Bridge over Nottaly River, Convict Forces
State Route No. 61 , Murray County , between Cartersville and Chatsworth- Graded by Convicts 179
STATE HIGHWAY BOARD OF GEORGIA
PURCHASES.
The Purchasing Department, operating under the direct Supervision of the Highway Engineer, consists of the Purchasing Agent and adequate clerks to handle work in that department.
Competitive bids are received on all commodities, including road building materials, equipment, supplies, and all other items used in the construction and maintenance of Georgia roads. In all cases sealed bids are requested and are opened publicly on the date and at the hour set when the notices are sent out. In view of the fact that much greater discounts are offered by manufacturers and dealers for quantity shipments of commodities, some of which are continually being used by the Board, contracts are made for such items as grader blades, lubricating greases, automobile tires and tubes.
All commodities are required to meet specifications of the State Highway Board, and if at any time it is found that a commodity does not come up to specifications, it is immediately rejected.
Under this system the State enjoys very low prices on all purchases, as competition is keen in all lines.
Requisitions are made on the Purchasing Department by the representatives of the Construction, Maintenance and Accounting Departments for all classes of supplies and equipment needed. After bids have been received the requisitions, accompanied by tabulations of bids, are submitted to the heads of the respective departments for recommendations before they are submitted to the Highway Engineer and Chairman for final approval.
After the final approval, requisitions are returned to the Purchasing Department and formal purchase orders are issued to the successful bidders.
Copies of purchase orders are sent immediately to the Accounting Department and to the consignee in the field.
It is also the duty of the Purchasing Department to see that all shipments reach their destinations promptly and in good condition. In case of any irregularities in making shipments, the consignee immediately reports to this department and adjustments are made with the shippers at once.
When orders are placed it is requested that invoices in duplicate be furnished to the Accounting Department, showing purchase order numbers, as soon as shipments are made.
180
Proj . G-2-33, Union County- Crushing Stone by Convicts
Proj . G-1-18, Whitfield County- Convicts operating Quarry 181
State Route No. 49-Bridge Built by Maintenance Force
State Route No. 22, Muscogee County, North of Columbus Regular Maintenance 182
STATE HIGHWAY BOARD OF GEORGIA
DIVISION OF TESTS AND INVESTIGATIONS
REPORT COVERING ACTIVITIES FROM JULY 1ST, 1930 TO JUNE 30TH, 1931.
After a decade of operation it seems hardly necessary to explain the necessity for a highway laboratory, however, the purpose is briefly restated for the benefit of those who may not have had opportunity to consider this phase of the work.
Pavements, culverts and bridges of a certain definite quality are required. Designs for these structures are based upon the use of materials of a certain definite quality. The materials are minutely described in the general specifications, and it is the purpose of the laboratory to examine all materials proposed for use in any highway project, to see that they conform to the specifications.
The laboratory is equipped to make any test referred to in the specifications, and to make these tests in accordance with standardized methods. Once yearly an inspector from the Bureau of Standards makes an inspection of the laboratory, examining apparatus and operations to see that they conform to requirements. This inspector makes a written report calling attention to any discrepancies noted. The laboratory as situated at East Point in several respects failed to conform to standards. Space at the East Point laboratory was quite inadequate for the volume of work performed this year. When the new highway building was constructed, provision for the laboratory was made on the ground floor, and the laboratory was moved in May 1931, just in time to cope with the daily increasing volume of work.
The mileage of pavement constructed this year has been greater than any previous year, but the work of the laboratory has increased in greater proportion than the increased pavement mileage. Engineers more fully realize the value of the laboratory, and they more frequently turn to the laboratory for help.
Besides the routine tests of all materials used in highway construction, the laboratory has been the proving ground for new materials, new designs and new methods.
New materials and new compositions are frequently offered for pavement construction, often with the endorsement of eminent engineers. They must be tried, the department must keep pace. The laboratory holds the first and often, the final examination.
A certain project is to be paved. What is the most economical type of pavement? A traffic map compiled by the laboratory
183
shows the number of passenger cars, trucks, buses and horse drawn vehicles traveling daily over the project in question, so that the requirements can be easily estimated. A materials survey by the laboratory will show whether or not there exists locally a suitable road building material.
Strange things often happen on paving jobs. Concrete may crack before it is hardened or numerous eruptions may cause an asphaltic surface to appear as though it were placed upon inflated footballs. The engineer realizes his baby is desperately ill, and he calls his doctor, the laboratory.
This year many new paving projects compelled the employment of many new inspectors. Changes in design and composition involved many changes in practice. New men had to be instructed, and old men, set in their beliefs in old methods, had to be converted. The department needed a school. The laboratory was the classroom.
The general specifications were revised this year. The laboratory was instrumental in the writing of the materials section.
Specifications enabling the purchase of grease by competitive bids were developed in the laboratory, and as a consequence, the price of grease to the department was reduced to one-third of the price paid before competitive bidding was invited, effecting a yearly saving sufficient to run the laboratory a year.
Specifications for grader blades and for motor oils have also been developed in the laboratory by virtue of which the department will save thousands of dollars.
By referring to previous reports and the accompanying table number one, it will be seen that a greater variety of samples and a greater number have been tested this year, than in any past year.
"RESEARCH WORK"
In addition to the usual routine of testing materials, the Laboratory has carried on research work.
The work conducted during the fiscal year included the following major projects: Field tests on highway guard rails, earth pressure against buried end bents, determination of the coefficient of friction between a concrete paving slab and the subgrade, measurement of deflection and stress of a steel beam carrying concrete floor slab, as well as several minor projects.
184
The field tests on highway guard fences were handled by the Maintenance Department. The tests were made by releasing passenger cars, truck and a bus on a runway on a steep grade. The vehicles were released in such a way that they would strike a section of the guard rail placed across the lower end of the runway. Measurements, photographs, and other data were taken and a report prepared. These tests have proved of considerable value in comparing various types of highway guard fences. The tests have attracted the attention of highway authorities in a great many other states, and copies of the report have been widely distributed. The Highway Research Board has requested that the moving pictures of this test be shown at the annual meeting in Washington in December.
Measurements on determination of earth pressure around buried end bents were undertaken in connection with the construction of the bridge over Barber's Creek in Clarke County, Georgia. In carrying out this work we had the cooperation of the Commissioners of Clarke County and Mr. H. K. Nicholson, County Engineer. Mr. Nicholson supervised placing of the embankment and made all pressure measurements with apparatus installed by the State Highway Board. The field data was completed too late for publication of report during this year. The report will be completed and published during this fall.
Careful measurements of deflection and stresses in the sixty foot steel beam span were made in connection with the construction of a bridge over the Alapaha River in Berrien County. These measurements indicated a surprisingly large inter-action between the floor slab and the steel beams. The information was of so much interest that further investigation will be made along this line both in the laboratory and on other bridges.
The State Highway Board has cooperated with the Highway Research Board of the National Research Council by reporting work done in this Department and in keeping in touch with research work carried on in other Departments. This contact thru the Highway Research Board gives the State of Georgia the benefit of all Highway Research Work undertaken throughout the country. In this way the Department keeps in touch with development of new materials, improvement in methods, and other important information necessary for keeping construction work in Georgia on a par with the best work throughout the country.
185
Proj. G-2-33, Union County, between Blue Ridge and Blairsville-Convicts Spreading Stone
Proj. 328, Hall County, One Mile East of White Sulphur Springs 186
STATE HIGHWAY BOARD OF GEORGIA
ANNUAL REPORT LABORATORY
JULY 1ST, 1930 TO JULY 1ST, 1931.
TABLE NO. 1.
WORK PERFORMED Samples Tested 4,414 Cement Samples (Representing 1,000,000 bbls.)
640 Sand Samples. 57 Water Samples.
8,304 Concrete Cvlinders. 266 Concrete B~ams.
1,197 Concrete Cores. 496 Top Soil Samples. 206 Concrete Pipe Shipments. 463 Corrugated Metal Samples. 225 Reinforcing Steel Shipments. 103 Creosoted Timber Shipments. 173 Samples of Oil and Grease. 791 Asphalt and Tar Samples (Representing 8,000,000 gals.) 146 Asphalt Sand Samples.
1,057 Limerock Samples (Representing 53,000 tons.) 25 Expansion Joint Samples. 27 Sodium Silicate. 9 Filler. 1 Scraper Blade. 2 Grass Seed.
818 Coarse Aggregate. 33 Paint. 14 Stone Screenings. 1 Calcium Chloride. 1 Babbitt Metal. 1 Creosote Oil. 46 Field Inspections.
19,516
187
Proj. 474-A, Thomas County, Thomasville to Cairo-Graded
Proj. 347, Terrell County, Dawson to Richland Surface Treated Limerock 188
FEDERAL AID APPORTIONED TO GEORGIA FOR FISCAL YEARS 1917 THROUGH 1932 ..
Year
Amount
1917.0 00000000000000000000000 $ 134,329.48
1918 0000000000000000000000000 268,658.96 1919.0 00000000000000000000000 1,749,954.20 1920.0 00000000000000000000000 2,557,485.02 1921 0000000000000000000000000 2,697,150.96 1922.0 00000000000000000000000 1,997,957.58 1~3 ........................ . 1,331,971.72 1924.0 000000000000000000.. 000 I, 729,366.09 1925.0 00000000000000000000000 1,983,022.99 1926.0 00000000000000000000000 2,000,867.00 1927 0000000000000000000000000 1,981,189.00 1928. 0 00000000000000000000000 1,979,209.00 1929 0000000000000000000000000 1,980,015.00 1930. 000000000000000000000000 1,980,443.00 1931 0000000000000000000000000 3,309,387.00 1932.0 00000000000000000000000 3,316,029.00
Total Federal Aid Apportioned to Georgia, 1917 through 1932: $30,997,036.00.
Note: In addition to above regular apportionment there has been an emergency allotment of $2,077,996.00, which is treated as an advance to be deducted in equal annual payments from regular apportionment until cancelled.
189
Union County, between Blairsville, Ga. and Murphy, N. C.- State Line Marker
State Route No. 21, Chatham County, North of Savannah Threading Pipe 190
PART FOUR MAINTENANCE
State Route No. 30, Wheeler County Willet Scrape on Liberty Truck
State Route No. 6, Fannin County, Blue Ridge-Copper Hill Regular Maintenance 192
STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE
COMMENT
The organization of this branch of the State Highway Department remains about as described in the Twelfth report. Briefly, it consists of the Maintenance Engineer, his office assistant and his stenographer, with headquarters at the General Office, Atlanta. One supervisor and two assistants at each of the six division headquarters; mechanics at the Division Shops; section patrolmen, machine operators and laborers on every road section of the State; Superintendent of Equipment in charge of Main Shop at East Point, who is responsible for the maintenance equipment over the entire State.
The Maintenance Department is organized and equipped to assume responsibility in maintaining all the roads on the State system. There are no County or other contractual arrangements for servicing the roads. The department repairs all types of paving, top soil, sand clay and dirt roads. Repairs all bridges and reconstructs wooden bridges.
Maintenance is required to keep the roads open and in a safe condition for travel at all times. At present there are 7,138 miles of road on the State system.
Detours, when and where necessary are selected by the Maintenance department and maintained as part of the road system throughout their use. When possible a detour is selected far enough ahead of its use to allow the maintenance forces to condition it for safe travel; bridges and culverts are repaired for heavy traffic; road surfaces are dragged and shaped; soil or clay is deposited where needed; Highway signs are placed throughout the length of the detour. Detours are given special attention so as to cause as little inconvenience as possible to the traveling public. Most detours will compare favorably with the dirt roads on the State System.
Maintenance patrolmen and foremen are men with practical road experience and a large number of them have worked up in the service of the Georgia Highway Department. The personnel and Equipment of the sectional road subdivision are given in detail elsewhere in this report.
Maintenance includes the East Point shop operations and one shop in each of the six Engineering divisions, also, it includes signs, painting, center-line marking, beautification, upkeep of buildings and grounds, heavy outfits for special and betterment work as well as regular maintenance. These activities will be described in more detail later in this report.
193
With the constantly increasing mileage and the heavier traffic, the cost of maintenance naturally increases because more frequent and intensive service is required.
The first motor equipment in use by the Maintenance Department was received principally from the Federal Government. This equipment was distributed to the different States as "surplus war material" at the close of the world war. It was repaired and rebuilt whenever necessary or economical and put in service. It has gradually worn out so that there is very little of the machinery acquired from the Government that is still in use. Replacements and additions have been made from time to time so that equipment has been built up to requirements for good service.
The purchase of new equipment is made with the approval of the State Highway Board. A list of equipment needed is prepared and recommended to the Board by the Maintenance Engineer. The approved list is advertised asking for bids from the different machinery companies and at a set date and time the bids are opened. A committee is appointed to select the equipment needed and the purchasing agent is then authorized to issue purchase order for same.
During the period reported there have been no destructive storms or floods, in fact, the last half of the fiscal year (Jan. to July) has been unusually dry which has permitted the maintenance forces to concentrate on regular maintenance with the result that all the roads on the State system are in an improved and satisfactory condition.
Maintenance funds, as described in the last and in previous reports, are derived from Motor Vehicle license fees. After the Administration and Maintenance Budget are made the available remainder is used in Matching Federal Aid.
The six Engineering Divisions of the State are sub-divided into patrol sections of different lengths for economy and efficiency. Some sections are so arranged as to require a sub-section. Each section is in charge of a patrolman who is furnished with sufficient equipment, material and labor to maintain all types of road in his section. The sections and subsections are so arranged and equipped that every mile of dirt road on the system can be scraped in 48 hours. Subsection men and equipment are placed under the regular section patrolmen.
A traffic Count for this period was not taken but a thorough count for fiscal year ending June 30, 1932 is being taken and will appear in next report.
194
Pouring Joints in Concrete Pavement on Rt. 13, Stephens Co.
State Route No. 20, Floyd County, West of Rome , near Ga.-Ala. Line- Cherting Road 195
MAINTENANCE SECTIONS
PERSONNEL-MILEAGE
AT JUNE 30, 1931.
DIVISION ONE-HEADQUARTERS-CARTERSVILLE
L. J. Scott, Supervisor, Cartersville, Ga. J. M. Camp, Assistant Supervisor, Cartersville, Ga. G. H. Sconyers, Assistant Supervisor, Cartersville, Ga. H. L. Burton, Division Mechanic, Cartersville, Ga. L. F. Perry, Assistant Mechanic, Cartersville, Ga. G. Y. W. odward, Assistant Mechanic, Cartersville, Ga.
Division Crane Outfit, 0. V. Rudeseal, Foreman, Floating. Division Asphalt Outfit, L. W. Turner, Foreman, Floating. Division Guard Wire Crew, R. C. Shinall, Foreman, Floating. Division Center Line Crew, J. C. Reid, Foreman, Floating. Division Sign Crew, S.D. Moorhead, Foreman, Floating.
Section Counties in Section
Patrolmen
Location
Miles Paved
1 Bartow____________
_Sam Wilson _______ --- __ Cartersville _______ --- --- 33.088
2
CampbelL _____ ----- ---- G. B. Tanner__ __
F a i r b u r n _______
----
------
16.310
3 CarrolL _______
--- L. 0. Baxter_ _______ ------ Carrollton_ ------ -- ----
14.170
4 5
6
... ,.. Chattooga ______
C h e r o k e e ________ Clayton _________
-------
. - - ----
-- . - ---
Lee Eleam____ .
---- Summerville _____ -------
Walter Cox _______
__Holly Springs ___ .. -----
W. C. Elliott_____
__ Jonesboro ______________
------
-----------12.080 20.990
Miles Unpaved
21.436 3.780 58.720 32.483 29.719 7.620
Total Miles Maintained
54.524 20.090 72.890 32.483 41.799 28.610
STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS PERSONNEL-MILEAGE AT JUNE 30, 1931.
DIVISION ONE-Continued.
Section Counties in Section
Patrolmen
Location
Miles Paved
Total
Miles
Miles
Unpaved Maintained
7 Cobb _____________________ W. E. Swanson ____________ Marietta__________________ 48.297
4.500
8 Dade_____________________ Raymond Doyle ___________ Wildwood________________ 9 Douglas __________________ W. F. Horton ______________ Douglasville______________
24.100 8. 640
-----------10.000
10 Fannin __________________ W. E. Wilson ______________ Hemp____________________ 22.660
22.348
11 Floyd ____________________ F. C. Carter_ ______________ Rome_ ___________________ 55. 040
23.957
12
Fulton ___________________ Open_____________________ _____ __ ___ ___ __ ______ __ ___ Gilmer_ __________________ J. A. Ray _________________ Ellijay___________________
7. 790 24.062
-----------11.310
13 Gordon ________________ I. M. Floyd ________________ Calhoun_________________ 15.260
18.155
14 Gordon-Bartow __________ J. D. Elrod ________________ Fairmount_______________
3.427
24.313
15 Haralson _________________ G. L. Loudermilk __________ Bremen __________________ ~ __ -~~ ____ .. __
34.711
16 Murray_______
____ W. J. Gregory _____________ Chatsworth______________
6.680
44.936
17 Paulding___
_____ R. H. HowelL _____________ Dallas _____________________________ _ 20.854
18 Pickens____
___ B. E. McCollum ___________ Jasper___________________
44.821 ------------
19 Polk_____
______ B. A. Burnette ___________ Cedartown_______
.970
39.722
20 Walker_______
_ Gordon Green ____________ LaFayette________
17.881
16.422
21 Whitfield-Catoosa________ D. L. Chitwood ____________ Dalton___________________ 33.462
26.018
52.797 24.100 18.640 45.008 78.997
7.790 35.372 33.415 27.740 34.711 51.616 20.854 44.821 40.692 34.303 59.480
21
Totals__________________ _________________________ __ ___ ________ __________ _____ 409.728
451.004
860.732
------~~----------------------------------------------------------------------~-------------------
Cartersville , Ga.- First Division State Highway Shop
State Route No. 3, Lee County- Building Shoulders 198
State Route No. 86, Harris County, South of Waverly Hall Regular Maintenance
State Route No. 26, Marion County, South of Buena Vista Regular Maintenance 199
STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS
PERSONNEL-MILEAGE
AT JUNE 30, 1931.
DIVISION TWO-HEADQUARTERS-GAINESVILLE
R. D. Osterhout, Supervisor, Gainesville, Ga. C. J. Smith, Assistant Supervisor, Gainesville, Ga. A. C. Stringer, Assistant Supervisor, Gainesville, Ga. B. B. Bowie, Division Mechanic, Gainesville, Ga. Ed F. Sloan, Assistant Mechanic, Gainesville, Ga. C. E. Barrett, Assistant Mechanic, Gainesville, Ga. J. F. Leckie, Assistant Mechanic, Gainesville, Ga.
g
O Section Counties Patrolled
Patrolmen
Location
Miles Paved
Miles Unpaved
1 Union ____________________ R. J. Butt ________________ Blairsville________________ 2 Rabun-Towns ____________ J. E. Barnes ______________ Hiawassee________________ 3 Rabun ___________________ T. G. Nunnally ___________ Clayton ___ ____ __ ____ __ __
33.660 9.840 22.220
10.500 22.740
14.070
4 Banks-Habersham-Hall__ T. L. Brannon ____________ Baldwin__________________ 55.859
4.727
5 Franklin-Stephens_______ W. T. Davis _______________ Toccoa___________________ 11.283
19.776
6 Franklin-Hart____________ B. D. Ayers _______________ Carnesville__________________________ _ 43.060
7 Banks-Jackson __________ E. N. Little _______________ Homer___________________
2.270
25.870
8 Jackson _________________ R. R. Smith______________ Jefferson________________ 19.368
21.306
9 Hall-Jackson ____________ T. E. WarL _______________ Gainesville_______________ 10 Hall-White _______________ 0. Y. Cook ________________ Cleveland________________ 11 Hall-Lumpkin ___________ T. H. Wimpy ______________ Dahlonega_______________
21.401 21.700 30.550
23.867
8.000 14.250
12 Dawson-Forsyth-Lumpkin ____________________ J. H. Hulsey ______________ Dawsonville______________
2.858
40.726
Total Miles Maintained
44.160 32.580 36.290 60.586 31.059 43.060 28.140 40.674 45.268 29.700 44.800
43.584
STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS PERSONNEL-MILEAGE AT JUNE 30, 1931.
DIVISION TWO-Continued.
Section Counties Patrolled
Patrolmen
Location
Miles Paved
Total
Miles
Miles
Unpaved Maintained
13 Forsyth-Milton___________ Carl Smith________________ Cumming ___________________________ _ 26.350
15 Gwinnett ________________ G. D. Tribble _____________ Lawrenceville____________ 15-A Forsyth-Gwinnett-HalL _ M. Cantrell________________ Buford__________________
22.445 21.910
~-----------
12.650
15-B DeKalb-Gwinnett-Walton ____________________ Roy R. Smith _____________ Loganville_______________
10.030
32.061
1\:) 16 DeKalb __________________ T. F. Bowman_____________ Stone Mountain__________ 0,.... 17 Barrow-Clarke-Oconee ___ A. C. Downs ______________ Winder___________________
22.621 36.351
6.070 17.855
18 Walton-Oconee___________ J. E. Johnston ____________ Monroe___________________
2.013
35.933
19 Oconee___________________ D. M. Elder_ ______________ Watkinsville _________________________ _ 28.216
21 Clarke-Oglethorpe _______ W. J. Yarbrough __________ Crawford________________ 19.990
61.400
22 Madison-Jackson _________ E. B. Hubbard ____________ Danielsville __________________________ _ 64.250
23 Hart _____________________ E. T. Ethridge _____________ HartwelL________________ 13.025
17.085
23-A Franklin-Hart ___________ J. M. White _______________ Royston___________________ 11.190
10.470
24 Elbert____________________ 0. B. Dickerson ___________ Elberton_ _______________
5.687
68.413
25 DeKalb-Rockdale-Newton-Walton _____________ S. H. Johnson ____________ Covington_______________
25.858
27.360
26 Morgan __________________ J. H. Shelton _____________ Madison_________________ 18.900
32.600
27 Greene___________________ J. M. Haywood ____________ Greensboro _________________________ _ 56.020
28 Greene-Taliaferro ________ L. A. Cason _______________ Crawfordville _______________________ _ 17.280
29 Wilkes __________________ C. F. Smith _______________ Washington______________ 14.147
37.353
30 Lincoln __________________ J. H. Holder ______________ Lincolnton _________________________ _ 32.600
26.350 22.445 34.560
42.091 28.691 54.206 37.946 28.216 81.390 64.250 30.110 21.660 74.100
53.218 51.500 56.020 17.280 51.500 32.600
31
Total Mileage________________________________________________________ _
455.176
832.858 1,288.034
STATE HIGHWAY BOARD OF GEORGIA MAINTENANCE SECTIONS PERSONNEL-MILEAGE AT JUNE 30, 1931.
DIVISION THREE-HEADQUARTERS-THOMASTON
J. M. Flanagan, Supervisor, Thomaston, Ga. C. A. Phillips, Assistant Supervisor, Thomaston, Ga. J. H. Redmond, Assistant Supervisor, Thomaston, Ga. I. B. Webb, Division Mechanic, Thomaston, Ga. G. F. Saggus, Assistant Mechanic, Thomaston, Ga. Ed Mason, Assistant Mechanic, Thomaston, Ga.
Division Heavey Outfit, A-Vacant, Foreman, Floating. Division Heavy Outfit, B. Emory Cox, Foreman, Floating. Division Shovel Outfit, W. T. Johnston, Foreman, Floating. Division Bridge Outfit, John C. West, Foreman, Floating. Division Center Line Outfit, C. 0. Mahaffey, Foreman, Floating. Division Sign Outfit, Brown Webb, Foreman, Floating.
Section Counties in Section
Patrolmen
1 Heard-Troup _____ --- B. H. Hopson ___
2 Coweta-Troup_
E. C. Adams _____
3 Coweta_
_ J. B. Kitchens __
4 Fayette
--- C. M. Chapman_
5 Spalding-Pike-Henry ___ J. C. Kitchens_ -
6 Henry __
G. W. Owen_
7 Butts-Monroe __
_ A. S. Mills __
8 Jasper_
----
_ J. A. Allen
9 Troup_
_ 0. A. Hopkins~_
10 Meriwether-Coweta-
Harris_ -- --
- - _ G. W. Williford ~~
Location
~_Franklin
_ Grantville __ _ Sharpsburg _ Fayetteville_
Griffin __ ~
~McDonough_
_Jackson_ -Monticello
_Chipley __
_ Greenville
-
~
~-
~
~
I
I
Miles Paved
----- - - ~
62.63
48.87 12.04 5.65 3.25 --
Total
Miles
Miles
Unpaved Maintained
49.50
--- "---.
49.20 23.61
--
26.18 36.03 57.00 13.03
49.50
62.63 49.20
23.61 48.87
38.22 41.68
60.25 13.03
58.33
58.33
STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS PERSONNEL-MILEAGE AT JUNE 30, 1931.
DIVISION THREE-Continued
Section Counties in Section
Patrolmen
Location
Miles Paved
Total
Miles
Miles
Unpaved Maintained
11 Pike-Meriwether-Lamar__ D. B. Rawlins
___ Zebulon_ ~ _
48.76
12 Monroe-Lamar_________ C. A. Cauthen ___ _ 13 Jones____________ ______ W. E. Conley _______ _
_ Forsyth ___ _ _Gray _______ _
43.07 19.05
10.00 31.51
N 0
14 Muscogee-Harris-Chatta-
hoochee_____
_ J. M. Rutledge ___ ~_
C/0 15 Muscogee______
_____ M. H. Gardiner_ ____ ~
16 Harris-Meriwether_ ____ G. W. Heath_______
Columbus ___ _ _Columbus _____ _
_Waverly HalL_
46.62 26.60
----------------27.50
17 Talbot-Marion
__ R. A. McKinnon___
__Talbotton_
52.26
18 Upson________
~- W. M. Buffington _______ Thomaston ___ _
8.30
57.53
19 Crawford________
___ H. C. Davis______
_ _Roberta __ _
~
~~
-----------
~
45.32
20 Bibb__________
~- W. Roquemore ___________ Macon _____ _
49.17
21 Chattahoochee_
__ W. J. Bush______
_Cusseta~
6.69
21.03
22 Marion-Schley_
___ W. W. Argo _______________ Buena Vista_
39.55
23 Taylor-Schley_
___ A. S. Perkins_____
_Butler_ ___ _
15.63
27.35
24 Macon-Schley-Houston___ C. W. Mangham__
___ Oglethorpe
18.69
38.68
25 Peach__________ ______ S.C. Maddox______ ---~Ft. Valley __
10.74
17.50
26 Houston__
_______ N. M. Parker ___ ~- ______ Perry _____ _
27 Pulaski-Houston ________ G. W. Dillard__
_ -~Hawkinsville_
43.71 ------------
17.89
48.60
28 Dooly-Houston _________ C. L. Dukes_
_____ Unadilla _______________ _ 23.98
25.84
48.76 53.07 50.56
46.62 26.60 27.50 52.26 65.83 45.32 49.17 27.72 39.55 42.98 57.37 28.24 43.71 65.89 49.82
28
TotaL _________________ _______________ _
520.31
745.98 1,266.29
State Route No. 3, Upson County Gas Shovel and Hauling Chert South of Thomaston
State Route No. 14, Troup County, LaGrange-West Point Repairing Concrete Paving 204
State Route No. 37, Colquitt County , between Moultrie and Camilla- Center Line Outfit
State Route No. 37, Colquitt County , between Moult rie and Camilla- Finished Center Line
l:05
STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS PERSONNEL-MILEAGE AT JUNE 30, 1931.
DIVISION FOUR-HEADQUARTERS-LOUISVILLE
C. W. Leftwich, Supervisor, Louisville, Ga.
J. B. Johnson, Assistant Supervisor, Louisville, Ga. Otis Stevens, Assistant Supervisor, Louisville, Ga. W. S. Mooneyham, Division Mechanic, Louisville, Ga.
C. W. Wilson, Assistant Mechanic, Louisville, Ga. R. L. Reynolds, Assistant Mechanic, Louisville, Ga. C. F. Kelley, Assistant Mechanic, Louisville, Ga.
Division Heavy Outfit No. 1, Elbert Welcher, Foreman, Floating
Division Heavy Outfit No.2, G. E. Vickery, Foreman, Floating.
Division Soiling Outfit, S. P. Hewlet, Foreman, Floating.
Division Bridge Outfit, W. H. Elliott, Foreman, Floating.
8>
Division Sign Outfit, C. W. Wheeler and Jack Greenslade, Foremen, Floating.
==========================~~~~~~~~~~~~~~~~~~~~~~~~~~~====~~==~========
Section Counties in Section
Patrolmen
Location
Miles Paved
Total
Miles
Miles
Unpaved Maintained
1 Baldwin. __
_ _B. H. Brookins_
__ Milledgeville____ ________ _
2 Bleckley-Twiggs _________ R. B. Wells __
____ Cochran _______ _
3 Bulloch_________
___ H. L. Quattlebaum__ _ __ Statesboro _____ _
4* Bulloch-Bryan-Effing-
ham_________
__ T. A. Dominy ____________ Stilson ________ _
5 Burke_____
__J.P. Jordan__
__Waynesboro __
6 Burke-EmanueL
___ Earl Perkins_____ _____ Midville ____ _
7 Candler-EmanueL. _____ C. H. Haney _____________ Metter_ ____________ _
8 Columbia__
__ W. M. Whitaker_ ________ Harlem ____________ .
9* Dodge____
___ C. A. Gilbert_ ____________ Eastman ___ _
10 Effingham__
___ T. S. Gay____
___ Springfield ______ _
ll EmanueL . _____________ J. F. Keen ______________ Swainsboro _______ ....
31.322
7.389
22.789 8.942 10.560
7.013 7.840
39.137
12.878 50.425 30.072
6.169 43.824 30.269 32.050 26.987 40.650 29.020 11.360
44.200 50.425 37.461
28.958 52.766 40.829 32.050 34.000 48.490 29.020 50.497
STATE HIGHWAY BOARD OF GEORGIA MAINTENANCE SECTIONS PERSONNEL-MILEAGE AT JUNE 30, 1931. DIVISION FOUR-Continued.
~====~==========-~-========~==,=-'~-~-==============~============~~==~~~========~========~=========
Section I Counties in Section
Patrolmen
Location
Miles
Miles
Total Miles
Paved Unpaved Maintained
~~~!-~~~~--~~~~ ~--------~~---~ ~--~~~-----~~-j-~~~~-j-~~~~1-~~~~
12 Emanuel-Bulloch-Jen-
kins___________
J. F. OllifL __
_Graymont __ _
13 Hancock _______________ AlfRoberts __ _
Sparta _____ _
14 Jefferson-WashingtonBurke _________________ W. B. Raines_
_Louisville ____ _
15 J efferson-Warren-Glas-
~
-'!
16
cock______ ____
John Stanley ____________ Stapleton ___ _
Jenkins-Burke _________ Warren-Allgood __________ Millen _______ _
17 Johnson-Washington-
29.911
27.756 8.506
12.000 62.800
39.600
32.366 37.500
41.911 62.800
67.356
40.872 37.500
Laurens______ _
_W. L. Kilpatrick __
_ Wrightsville __ _
42.120
42.120
18 Johnson-Laurens-Treut-
len-Emanuel _ _____ H. A. Davidson_
__Adrian __ _
19 Laurens______
_ John Crawford ___ _ __Dublin ___ _
20 McDuffie_
S. L. Morris_
__ Thomson ___ ..
21 Putnam___
_ _C. C. Crisp _____ _
__Eatonton ___ _
22 Richmond_____
F. C. Posey _____ _
_Augusta ___ _
23 Screven_
_E. W. Lane __
_____ Sylvania _______ _
12.459
11.042 18.184 59.228
29.800
44.460 30.164
40.616 8.808 46.100
42.259 44.460 41.206
58.800
68.036 46.100
24 Laurens-Twiggs-Wilkin-
son_ ___
____ Geo. PercivaL
_ Jeffersonville_
25 Warren-Glascock. _______ C. L. Stanley ___________ Warrenton __ _
26 Washington_
.. _Steve Lawrence____ ___ Sandersville_
27 Wilkinson-Twiggs_
_J. E. Chambers___
__Irwinton __ _
17.627
32.398 46.500
33.673 51.409
32.398 46.500
51.300 51.409
27
TotaL ______ _
319.705
904.018 1,223.723
STATE HIGHWAY BOARD OF GEORGIA MAINTENANCE SECTIONS PERSONNEL-MILEAGE AT JUNE 30, 1931.
DIVISION FIVE-HEADQUARTERS-MOULTRIE
W. B. Williams, Supervisor, Moultrie, Ga. J. M. Holder, Assistant Supervisor, Moultrie, Ga. W. M. Phillips, Assistant Supervisor, Moultrie, Ga. J. B. Coleman, Division Mechanic, Moultrie, Ga. G. A. Long, Assistant Mechanic, Moultrie, Ga. Frank Higgins, Assistant Mechanic, Moultrie, Ga.
Division Heavy Outfit No. 1, J. H. Jordan, Foreman, Floating. Division Heavy Outfit No. 2, R. L. Croxton, Foreman, Floating. Division Bridge Outfit, J. C. Crews, Foreman, Floating. Division Grassing Outfit, H. N. Hall, Foreman, Floating. Division Crane Outfit, Alex Blair, Foreman, Floating. Division Asphalt Outfit, J. H. Selman, Foreman, Floating. Division Detour Outfit, G. E. Noble, Foreman, Floating.
Section Counties in Section
Patrolmen
Location
Miles
Miles
Paved Unpaved
1 Baker_ ___________________ W. B. Bates _______________ Newton _____________________________ _ 32.770
2 Berrien __________________ E. Hatcher_ _______________ Alapaha_____________________________ _ 56.160
3 Brooks____
____ A. E. Morris _____________ Quitman_________________ 34.550
38.900
4 Calhoun_ __
___ Paul Peacock_ ___ ____ Leary_ ________ ___
_ __________ _ 40.100
5 Clay_ ____
________ E. C. GilL _______ _____ Ft. Gaines_ ______________ ________ __ 37.411
6 Colquitt _________________ Chas. Johnson_ __. ______ Moultrie_________ _
28.340
49.540
7 Cook __________________ L.A. Brooks ______________ AdeL____________________ 21.660
22.810
8 Crisp ____________________ C. A. Webb _______________ Cordele__________________ 15.430
26.221
9 Decatur __________________ C. C. Robertson___________ Bainbridge_______________ 11.720
42.672
Total Miles Maintained
32.770 56.160 73.450 40.100 37.411 77.880 44.470 41.651 54.392
STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS PERSONNEL-MILEAGE AT JUNE 30, 1931.
DIVISION FIVE-Continued.
Section Counties in Section
Patrolmen
Location
Miles Paved
Total
Miles
Miles
Unpaved Maintained
10 11 12 13 14
Seminole_
--------- W. H. Bedgood __
-- _ Donalsonville ____ - ----- ..
Dougherty Early ______
G r a d y ____ Irwin _____
--
------
-- -- --- ----
--------
---
-.
-------
A.
J. J. Z.
P.
B. L. T.
B r a n d _______
Barwick _____ McCracken ___ Mathews ____
_ Albany_________ ----
B l a k e l y _______________
-------
-
Cairo __________
----
_Ocilla ________
---
----
---
-
----
-- --------- 15.900
24.827 ------------
2.370
53.530
8.410
47.610
16.810
25.670
15
Lee _____ ----
----- J. L. Ogletree _____ ------- Leesburg ______
- -
21.430
5.470
16 Lowndes_
------ H. M. Ligon ______ ----- __ Valdosta _______
62.490
12.200
17 Miller __
--- - J. B. Webb ________ ---- Colquitt_ ____
-
- -------
46.380
18 Mitchell
- -- 0. W. Hardison ___
_ Camilla _______
---
29.900
25.046
19 Quitman_ ---
------ J. B. Hartley ___
_Georgetown_
-- -
2.240
34.420
20 Randolph
----- B. B. Maples ___ - -------- Cuthbert_ _____
-- ---------
39.080
21-22 Stewart __ -------- --- N. Ballard ____ .
23-24 Sumter _____
- -- V. C. Bunn ____
Lumpkin _____ Americus ______
------- ------------ 30.410
67.950 46.170
25 Terrell
- J. W. Patterson_
Dawson __
--
27.083
2.558
26 Thomas
Authur Knapp.
_ Thomasville._
---
38.530
34.570
27 Tift
H. G. McPhaul
Tifton. ____ -- ---- ---
19.620
28.420
28 Turner __
- --- J. A. Putnam __ Ashburn __ ----------
16.660
9.558
29 Webster_
-- _F. H. Jordan __
Preston ___
. --
24.110
30 Wilcox-Ben Hill
--- J. W. Morehouse
_ Abbeville ______
13.301
44.290
31 Worth
--- G. E. Gissendanner
Sylvester_
35.660
19.710
15.900 24.827 55.900
56.020 42.480 26.900 74.690 46.380 54.946 36.660
39.080 67.950
76.580 29.641 73.100 48.040
26.218 24.110 57.591
55.370
-~~
31
TotaL_
- -- -----
--- -
-- .. -- - - - - -
461.441
929.226 1,390.6~7
STATE mGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS
PERSONNEL-MILEAGE
AT JUNE 30, 1931.
DIVISION SIX-HEADQUARTERS-WAYCROSS
W. P. Phillips, Supervisor, Waycross, Ga. G. M. Flanagan, Assistant Supervisor, Waycross, Ga. H. Branan, Assistant Supervisor, Waycross, Ga. T. E. Lawson, Division Mechanic, Waycross, Ga. G. L. Smith, Assistant Mechanic, Waycross, Ga. Foster Smith, As~istant Mechanic, Waycross, Ga. J. A. Borgeron, Assistant Mechanic, Waycross, Ga.
Division Asphalt Outfit, E. L. Bradley, Foreman, Floating. Division Bridge Crew, R. 0. Smith, Foreman, Floating. Division Shovel Crew, C. A. Webb, Foreman, Floating.
Section Counties in Section
Patrolmen
Location
Miles Paved
Total
Miles
Miles
Unpaved Maintained
1 Ware-Charlton ___________ Willie BelL _______________ Ft. Mudge ______________ _ 42.4
2 Clinch-Ware _____________ E. L. Moody _______________ Homerville ____ _
32.6
-----------41.4
42.4 74.0
3 Clinch-Lanier ___________ J. J. Newham _____________ Lakeland ______________ _ 10.6
42.4
53.0
4
5 6
Echols ___________________
Atkinson-Ware ___________ Bacon-Coffee ____________
B.
E. G.
W.
H. W.
Hadsock ____________
Ellis_______ ___ ___ Davis _______________
HowelL _________________
P e a r s o n _________________ D o u g l a s ________________
_
_ _
-----------------------
24.3
26.8
68.0 17.6
26.8 68.0
41.9
7 Bacon-Ware ______________ Carl Adams _______________ Alma ___________________ _ 34.4 ------------ 34.4
8 Bacon-Appling-Jeff
Davis __________________ J. B. Hughes _____________ Hazlehurst______________ _ 14.7
27.3
42.0
STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS PERSONNEL-MILEAGE AT JUNE 30, 1931.
DIVISION SIX-Continued.
Section Counties in Section
Patrolmen
Location
Miles Paved
Total
Miles
Miles
Unpaved Maintained
9 Appling-Wayne __________ A. E. Bradley____________ Baxley___________________ 19.9
37.7
57.6
10* Telfalr-Jeff Davis ________ H. G. Roberts ____________ McRae___________________ 22.8
15.2
38.0
.N.........
11 12
Wheeler_ _________________ W. B. Lyles_________ Montgomery-Tattnall-
__Glenwood ___________________________ _ 46.2
46.2
Toombs ________________ C. T. Brown ______________ Lyons____________________ 28.1
41.2
69.3
13 Tattnall _________________ C. C. Galbreath ___________ Reidsville ________________________ _ 42.2
42.2
14 Evans-Tattnall___________ N. L. Ham ________________ Claxton_____
2.0
34.8
36.8
15 Bryan____________________ W. I. Kennedy ____________ Pembroke___
___________________ _ 44.3
44.3
16 Chatham ________________ E. M. Beery_______________ Pooler_ ______
42 .2 ------------ 42.2
17 Liberty-Bryan______ _P.M. Hendricks __________ Riceboro____
20.7
19.9
40.6
18 Liberty-Long ____________ G. W. Hendricks __________ Ludowici________
_____________ _ 48.0
48.0
19 Mcintosh-Liberty-Long __ D. E. Oliver______ _
__Darien_______ _____ ______ 28.9
13.1
42.0
20 Wayne_______
_W. A. Bradley _____________ Jesup_______
9.7
25.2
34.9
21 Glynn______ _
_____ M. F. Futch_______
__Brunswick___ __________
40.8 ------------ 40.8
22 Pierce-Wayne-Ware______ R. C. Tillman__
___ Screven______
20.9
16.7
37.6
23 Brantley-Ware-Glynn ____ A. H. Morris ______________ Nahunta_____ _________ 24 Camden __________________ Archie Minchew___________ Woodbine________________
47.7 32.0
-----------10.3
47.7 42.3
25 Chatham ________________ L. C. Outlaw _____________ Thunderbolt_____________ 1---1-6-.1----1--------------------1---1-6-.1----
25
Total_ _________________ ___________________________ __________________________ 490.8
618.3
1,109.1
Charlton County, near Folkston, Ga. Ga.-Fla. State Line Marker
State Route No. 27, Glynn County- Asphalt Outfit- Patching 212
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MAINTENANCE SECTIONS-PERSONNEL-MILEAGE
BY DIVISIONS AT JUNE 30, 1931.
Personnel
Miles Maintained
Sections Supervisors
Division
and
and
Division
Sub-section Assistants Mechanics
Foremen
Patrolmen
1
21
3
2
31
3
3
28
3
4
27
3
5
31
3
6
25
3
3
5
21
4
--------------
31
3
5
28
4
6
27
3
7
29
4
3
25
TotaL __
163
18
21
26
161
*To reconcile with State mileage deduct fractional parts of miles, over in Sixth Division.. ________ ------------- --------------- --------------------- ---------
Net Total._ -I 163
I
18
21 I
I 26
I 161
Miles Paved
409.728 455.176 520.310 319.705 461.441 490.800
2, 657.160
2,657.160
Miles
Total Miles
Unpaved Maintained
451.004 832.858 745.980 904.018 929.226 618.300
4,481.386
860.732 1,288.031 1,266.290 1,223.723 1,390.667 1,109.100*
---
7,138.546
.036 4,481.350
.036 7,138.510
State Route No. 66, near Richland, Ga.- Scrape and Drag
State Route No. 7, Cook County- Resurfacing 214
EQUIPMENT This is a maintenance project and includes all office and regular Maintenance equipment, also buildings and grounds. Construction Equipment of State Forces is handled by that unit except that reconditioning and rebuilding are done by East Point shop. Equipment has grown to such proportions that a Superintendent of Equipment has been appointed. This office formerly was a part of the duties of the Shop Superintendent. The Superintendent of Equipment keeps in touch with the condition of the machinery over the State and makes periodical visits to the different divisions in company of the division mechanic to determine the condition of equipment and the needs of the division. A separate property unit has been inaugurated for several years, in charge of a competent property clerk who records all purchases, sales, distribution and transfers of equipment. He, also, keeps account of cost, appraisal values and depreciation under the supervision of the Treasurer. An annual survey is made of all equipment in the State to verify the record, also, for inventory purpoes. The inventory values are shown on a table in the report of the Accounting Divisions. The inventories of small tools and supplies and other expendable items in use are kept in the Division offices and East Point Shop. As already explained the Inventory of Accessories, parts, repairs and supplies kept in stock is made by the Warehouse Superintendent and is shown elsewhere in this report. Following are some tables showing the principal construction and maintenance equipment.
215
STATE HIGHWAY BOARD OF GEORGIA AUTOMOBILE EQUIPMENT AT JUNE 30, 1931.
General Office and Div. Div. Div. Div. Div. Div. Total
Various No. 1 No. 2 No. 3 No. 4 No. 5 No. 6
----------1-----1-~ - - - - - - - - - - - - -
Buick ______________
12
1 2 1 2 3 2 23
Chevrolet__________
2
6 _____ 3 4 2 4 21
Chrysler____ ________ ____________ 1 _____ _____ _____ _____ _____ 1
Dodge______________
1
_____ _____ _____ 1
2
Ford A_____________
17
25 34 21 35 30 30 192
Fork T _____________ ____________ _____ 1 ______ - ___ 1 3 5
Franklin___________
2
_____ _____ _____ _____ _____ _____ 2
H upmobile_ ________
1
_____ _____ _____ _____ _____ _____ 1
La Salle_ ___________
3
_____ _____ _____ _____ _____ _____ 3
Oldsmobile_________
1
_______________ ----- _____ ----- 1
Studebaker________
2
1 ----- _____ ----- 3
------1--- ------------
Totals___________ _
41
33 37 26 41 37 39 254
216
STATE HIGHWAY BOARD OF GEORGIA TRUCKS OPERATED AND ON HAND-JUNE 1931.
In Service June 30, 1931.
Maintenance
I
Construction
Received June 1931. Not distributed
until later.
Maintenance
I Construction
MAKE
Div. Div. Div. Div. Div. Div.
Pt. Rey- As- Con- To- Div. Div. Div. Div. Div. Div. As- To- Grand
No. No. No. No. No. No. Shop Cr. nolds phalt viet tal No. No. No. No. No. No. phalt tal Total
1 2 3 4 6 6
1 2 3 4 6 6 Dept.
---------------------------------1---
Auto Car________________________________________________________________________________________ 2 2
2
Aviation_________ 2 2 1 ____ 1 ____ ______ ____ ______ ______ ______ 6 ____ ____ ____ ____ ____ ____ ______ ____ 6
Chevrolet________ 1 1 1 2 1 6 ______ ____ ______ ______ 2 14 ____ ____ ____ ____ ____ ____ ______ ____ 14
Corbitt__________ 2 ____ ____ 2 ____ ____ ______ ____ ______ ______ ______ 4 ____ ____ ____ ____ ____ ____ ______
4
FederaL _________ ____ 1 ____ ____ ____ ____ ______ ____ ______ ______ ______ 1 ____ ____ ____ ____ ____ ____ ______ ____ 1
r.:> Ford A__________ 8 1 5 4 1 18 ______ ____ ______ 4
2 43 ____ ____ ____ ____ ____ ____ ______ ____ 43
~ Ford T _______________________________________________________________________________________________-____________ _
F W D ___________ 3 4 18 7 29 10 ______ ____ ______ 2
2 75 ____ ____ ____ ____ ____ ____ ______ ____ 75
Garford _________ ____ ____ ____ ____ ____ ____ ______ 1 ______ ______ ______ 1 ____ ____ ____ ____ ____ ____ ______
1
G. M. C. _____________ ------------________ 1 ____ ______ ______ ______ 1 1 ___ ____ 3 ____ ____ 3 7
8
Graham_ ________ ____ ____ 2 ____ ____ ____ ______ ____ ______ ______ ______ 2 ____ ____ ____ ____ ____ ____ 1 1
3
Hug_____________________________________________________ 3
3
____ ____ ____ ____ 2 2
5
Indiana__________ 19 2 2 27 29 5 1 ____ ______ 14
99 9
1 8 16 5 2 41 140
InternationaL__ 2 29 23 2 1 17 ______ ____ 2 10
1 87 1 8 3 13 ____ 3 1 29 116
Kelly-Springfield ________ ----____ 1 ____ ______ ____ ______ ______ 2 3 ____ ____ ____ ____ __ _ ____ ______ ____ 3
Liberty__________ 2 7 5 8 1 4 ______ ____ ______ ______ ______ 27 ____ ____ ____ ____ ____ ____ ______ ____ 27
Mack____________ 1 ____ ---- ____ 3 ____ ______ ____ ______ 10
1 15 ____ ____ ____ ____ ____ ____ ______
15
Packard_ ______ _ ____ ____ 2 1 1 1 ______ ____ ______ ______ 1 6
__ ____ ____ ____ ____
6
Republic________ 1 ____ 1 1 ____ ____ ____ _ ____ ______ ______ ______ 3 ____ ____ ____ ____ ____ ____
3
Reo _____________________ --- ____ ____ ____ ___ ____ ______ ______ ______ ____ 1 1 1 1 1 1
6
6
Selden _______________ --------____ 4 ____
_ ________________ ------ 4 ________ ---- ________ ---- ______
4
White___ ________ 4 ____ 6 ____ 1 ____ _____ _
4
6
4 25 ____ ____ ____ ____ ____ ____
25
Totals_________ 45 47 66 54 73 61 2 1 6 49 15 419 12 9 5 25 17 9 11 88 507
STATE HIGHWAY BOARD OF GEORGIA TRACTORS IN SERVICE AT JUNE 30, 1931.
Maintenance
Construction
MAKE
I
Total
Div. Div. Div. Div. Div. Div. Rey- Asp- Con-
No. 1 No.2 No. 3 No.4 No.6 No.6 nolds halt viet
--------1----------------------
Best 60_________ _____ _____ _____ _____ _____ _____ _____ _____ 1 1 Caterpillar 15___ _____ _____ 1 _____________________________ _ 1
Caterpillar 30_ __ 15 17 26 22 20 14
1 2 117
Caterpillar 60___ ' _____ 3
1 2 2 1 6 4 19
Caterpillar
1-Ton ______ _
1 ----- ---
1
Caterpillar
2-Ton _______ _
1 ----- ----- ----- ----- ----- 1
Cletrac 30______ 1
Holt 2-Ton _____ i 1
3 1
1 1
1 2
1 1
1 ----- ----1 -----
8 7
Holt 5-Ton _____ .____ _ 3 1 2 2 1 -----
9
Holt 1D-Ton_ ___ 2 1 1 1
5
Mesoe_d_-M__o_r_r_i_s_o_n_________________
1 _________ _
1
Monarch 35_____ 1 1 2 2 _____ _____ _____ 4 8 18
Monarch 50 _____ 1 1 _____ _____ 2 _____ _____ 4 ____ _ 8
1
Totals ________ J 21 31 33 32 28 20 1 15 15 196
218
STATE HIGHWAY BOARD OF GEORGIA
OTHER ROAD EQUIPMENT AT JUNE 30, 1931.
DESCRIPTION
Maintenance
I Div. I Div. I Div. I Div. I Div. I Div. 1Bridge J Rey-
No. 1 No 2 No. 3 No. 4 No. 6 No.6 Pt. Cr. nolds Total
Construction Asph-\ Con-
alt viet
Air Compressors____________________ 1 1 ------ ______ 1 1
1
2
7
2
Asphalt Distributors _______________ ------ ______ ------ ________________________ -------- _______ _ 3
Attachments-Back Sloper_________ ___ ___ 2
1 ______ __ ____ 2 _____ ___ ___ __ ___ 5
1
1
Attachments-Scarifier_____________ 1
2
3 1 ________ ___ ___ 7
3
Barges___ ___________________________ - __ - - _______ - - _.. - - 2 ______ ______ ________ - _______ 2
Blasting Machine ________ -__________ 1 - _---- ------ - _____ -- ____
_______ ---
1
Boats (1 with motor) ________________ ------------------ 2
1
3
Boilers_ ____________________________ ____________ ______ ______ ______ ______ ____ ___________ _
2
Boilers-Engine attached ___________ ------------------------________ ________ ------- _______ _ 1
~ Clam Shell Bucket_______________ -_ ------ --- _-- ---- -
___ - _- _- _
... -- ____ - _ 2
~ Concrete Mixers_ ___________________ 1 ______ ______ 2
_____________ . ________ 3
2
Concrete Buggies ___________________ -- __ - _ -- ____ ------
________ --- ______ - _____ ..
3
Cranes_ ____________________________ - - __ - _ ______ -- __ - - - - ____ 1 1 ________ -- ______ 2
3
Crawler Attachment for Crane______ -- _-- _ _____ -- _- __ -- ____ 1
________ -- ______ 1
Draw Span Motor_ __________________ ------------------------
1 ________ -------
1
Dump Bod. for Fords _______________ -- ____ ______ 4
4
Engines_ ________________ __________ ______ ______ ______ ______ ______ ______ _____ __ _______ _
3
2
Engines Hoist ______________________ ------------------------------------
-------- ---- --- ---- __ _ 1
Graders ____________________________ 51 75 81 92 53 62 ________________ 414
8
8
Hammer-Pile Driver_ ______________ -----.
1 ------ ------
------- -------- 1
Hammer-Jack 111 Head_ ___________ ______ _________________ _
4
Harrow _____________________________ ------ 1
1
2
Harness-Sets ______________________ ----- _ -- __ -- --- _-- -- __ --
89
Heaters-Tar and Asphalt, Various
Sizes_ ____________________________ 13 12 14
5 13 17
74
Hoists ______________________________ ------ _ ------ ------ --- _--
2
2
Hoisting Crab ______________________ ----- _ -- ____ ------ ------ ------
1
Horse-Riding ________________________ --------------------------------------------------- -------- --
1
Total
2 3 2 3
2 1 2 2 3 3
5 1 16
4
89
1 1
STATE mGHWAY BOARD OF GEORGIA
OTHER ROAD EQUIPMENT AT JUNE 30, 1931.
DESCRIPTION
I
Maintenance
Div. I Div. I Div. / Div. 1 Div. I Div. 1 Bridge 1 ReyNo. 1 No.2 No.3 No.4 No.6 No.6 Pt. Cr. nolds
Horse-Saddles ___ _
}{aintainers___________________ _ }rotors ___________________________ _
7
-- ------ ----
1
1
1
}{owing Machines (Var.) _______ _
4
4 11
5 13 13
}rules: Good, Fair and Poor ____ _
Plows-Road _____
--------
Portable-Circular and Band Saw
Outfit__ . ___ .. __ _
14
7 15
9
2
Pumps-Various __
1
1
2
"" Road Finisher __ _
2
5
~ Road}{achine __________ _
1
1
1
Road Planer Hydro 12
1
Road Rippers ___ _
1
2
2
2
Road Rollers ___ _
1
3
2
1
2
6
Road Surfacer Berg. __ . _____ _
1
Rock Crushers_ __________ _____ _
2
1
Scrapers___________
______ _ 5
1
Shovels_ _______ ____________
2
1
1
1
Spreaders-Stone ___________ _
1
1
1
1
Storage Tanks ______________ _
Sweepers-Rotary _________ _
3
3
Trailers-Various __ .. _- ____ _
1
1
5
Turn Tables ______________________ _
4
1
Wagon, Plain and Dump___ _
6
Wheeler, Scrapes-Various ___ _ Winches, Small and Large _____ _
18
4
4
4
2
Total
8 2 50
47
4 7 3 1 7 15 1 3 6 5 4
11 7
6 30 2
Construction Asph-/ Con-
alt viet 4
88 12
1
6
3
1
1
3
8
2 3 2 2 3 1 2
2
31 73
Total 4
88 12
1 9
1
4 8
2 3 2 2 3 1 2 2 31 73
Totals ___________ _
- - ----- ------------ --- ------1----1-----1---1-----
80 155 143 139 112 114
2
3 748
47
341
388
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF TRUCKS, TRACTORS, AND OTHER ROAD EQUIPMENT
FOR MAINTENANCE AND CONSTRUCTION AT JUNE 30, 1931.
Maintenance
Construction
I DESCRIPTION
Div. Div. Div. Div. Div. Div. Bd'ge
Rey- Total As- Con-
No.1 No.2 No.3 No.4 No.5 No.6 Pt.Cr Shop nolds Maint. phalt viet
- - - - - - - - - ----------~
~~
~-
~- ~-
Trucks ___
-. 57 56 7l 79 90 70
1
2
6
432
60
15
Tractors. ______
----
21
31
33
32
28
20 ------ ------
1
166 15
15
Graders _____
--- 51
75
81
92
53
62 ------ ------ ------ - 414
8
8
Other Road Equipment 29 80 62 47 59 52
2 ------
3
334 39 333
- - ~- ~- - - - ~- - - - - - -
Total number Road
Working Equipment 158 242 247 250 230 204
3
2
10
1346 122
371
Total Grand Const. Total
75
507
30
196
16
430
372
706
493
1839
Note: The above table represents the number of road working machines and animals in use and does not include automobile, shop, garage, warehouse, quarry, engineers, office and convict camp equipment, or buildings and grounds.
EAST POINT SHOP-1930-31.
The above named shop is the principal unit for all reconditioning, repairing, rebuilding of departmental machinery and for manufacturing part of the equipment of the Department.
The Shop is equipped with modern machinery and machine tools, (some of which are not foundinregulargarages and machine shops), to meet all demands in connection with the servicing of road and other machinery in use.
Each of the six divisions has a local shop situated at Division Headquarters for minor and emergency repairs.
When a machine is in need of general repairs, it is inspected by the Superintendent of Equipment and an estimate is made in detail of the parts and labor necessary to recondition the piece of equipment. If the estimated cost is not in excess of the probable value and longevity of the machine, it is ordered to the East Point Shop for such work. On the other hand, if it is found that the probable cost of the work would be greater than the value of the machine, the machine is condemned, to be disposed of to best advantage and another rebuilt or new machine is recommended. There are kept at the Shop a number of reconditioned machines so that there will be practically no delay in the road routine by an exchange.
The activities of the Shop are not confined to this service but all other Equipment is repaired; also, a partial list of equipment manufactured would include cabs, dump bodies, rock crushers, center line markers, tanks, signs and other machinery and supplies.
Following is a list of jobs completed and in process for the fiscal year beginning July 1st, 1930 and ending June 30, 1931.
Brought into July 1930for completion........... 42 Received during the year. . . . . . . . . . . . . . . . . . . . . . . 1203
Total jobs .................................... 1245 Carried into succeeding year for completion. . . . . 80
Total completed during the fiscal year. . . . . . . . . . 1165
The shop is operated on a cost basis; all material and labor are charged at cost and a small percentage added to completed cost to cover overhead expense.
As noted in twelfth report, a truck service is operated to and from shop and field for transporting worn machinery to the shop and rebuilt machinery to the field which has been found a
222
great convenience in transportation and handling. The time and other saving have been of real value.
All equipment, in addition to manufacturers numbers, is further identified by our own number system. These numbers are plainly marked or stenciled on the machine in a conspicuous place. Other identifying marks or plates are also affixed.
The maintenance of buildings and grounds is, also, attended to by the Shop under the supervision of the Superintendent of Equipment. Since the General Office has been moved into the new building located near the Capitol Building, the area of the shop and warehouse have been increased to give much added and needed room.
SIGNS. The activities of this department have been related in detail in former reports. Therefore, following a brief comment we will submit a table showing the work performed.
There has been no change in the standards of wood and steel signs, which conform to those of the Bureau of Public Roads and the Association of State Highway Officials.
The colors of the signs are white background with black letters, figures, and border for United States Routes, and yellow background with black letters, figures, and border for State Routes.
The United States Route signs are metal in the shape of a shield. State caution signs are metal set on the post either diamond shape, square, or hexagon, according to the object of warning. Route markers are metal.
Direction signs are usually narrow wood slats.
Centerline marking is done principally by a machine. Colors are in contrast to pavement to be marked.
Formerly signs were placed by a separate unit under a superintendent. At present the division maintenance forces place the signs as designated by the Superintendent of Signs and approved by the Maintenance Engineer.
The work performed in placing signs during the 1930-1931 fiscal year is shown below.
Besides this work the signs placed in former years have to be renewed constantly with fresh paint, or new targets. "Target'' is a good word for frequently the signs are used as targets for gun and pistol marksmanship and rock-throwing practice in the rural sections.
All important streams, rivers, and railroad crossings are identified by the sign crews for the information of the traveling public. This feature is much appreciated.
There are some special signs posted whose description is so various and whose placements are so limited that they need not be described here.
223
1
STATE HIGHWAY BOARD OF GEORGIA
SIGNS SHIPPED TO DIVISIONS FROM EAST POINT SIGN SHOP JULY 1ST, 1930, THRU JUNE 30TH, 1931.
DIVISIONS
KIND OF SIGN
Total
12 3456
- - - - ---~----------1-------------
Church Zone________________ 48 12 24 62 _____ 24
City Limits___________________ 48 24 84 56_____ 72
Cross Road____________
120 108 160 132 96 96
Curve Left_ __________________ 259 279 289 138 168 279
Curve Right___________
259 279 291 138 168 279
Detour_______________________ 6 _____ 2 ______________ _
Junction__________________________ 36 54 30 12 24
NarrowBridge________________ 60 96 88 _____ 24 48
Plain Diamond_______________ 115 48 _____ 108 24 ____ _
Plain Square______________ __ 132 120 _____ 240 24 36
Railroad Crossing_ ___________ 120 12 4 36 60 74
School Zone_ _____________ ___ 144 48 88 30 96 120
S Curve Left_ ________________ 168 168 56 48 48 42
S Curve Right _______________ 180 168 78 48 48 42
Side Road____________________ 192 264 331 168 _____ 132
170 284 712 1,412 1,414
8 156 316 295 552 306 526 530 564 1,087
Slow __ ----------------------- 84 144 216 58 138 86
726
Slow Down, Construction_________ 12 ___________________ _
12
Slow Down, Danger_ ______________________________________ _
Slow Down, Detour_ _______________________________________ _
Slow, Men Working___________
36 2 12 _________ _
50
Stop_ ___________ ____________ 334 208 634 240 264 384 2,064
Turn Left_ ___________________ 36 66 27 _____ 48 24
201
Turn Right_ _________________ 36 66 28 _____ 48 24
202
Underpass___________________ 24 12 6 ______________ _
42
Winding Road________________ 72 72 24 12 48 ____ _
228
Tractors with lugs prohibited 96 _____ 48 ______________ _
144
Cars on rim prohibited___________ _____ _____ 8 _________ _
8
Warning Cattle________________________________________ 108
108
Black and White Stripe_______ 48 _____ 120 ______________ _
168
No
Parking
on
Pavement_________________________ 60 ____ _
-------------
60
----
Sub-totals _________________ 2,5812,278 2,6541,564 1,3741,894 12,345
12x12 Markers ________________ 2, 745 1, 520 2, 379 2, 130 soo 1, 730 11,304
12x24 U.S. Shields___________ 60 976 208 60 35 ____ _ 1,339
U. S. Route Nos._____________ 32 50 43 98 15 50
288
Detour Hands__ ______________ 24 150 20 _____ _____ ____ _
194
10x30 Black and White Boards 620 _____ 300 36 _________ _
956
4x6 Detour Boards____________ 26 300 50 ______________ _
376
4x30Wooden Slats ____________ 860 281,2091,150 8801,640 5,767
------------- ----
Sub-totals__________________ 4,367 3,024 4,209 3,474 1, 730 3,420 20,224
Grand Totals _______________ 6, 948 5,302 6, 863 5,038 3,104 5, 314 32,569
224
HIGHWAY BEAUTIFICATION.
This work is being done in cooperation with various civic organizations of the State. These organizations furnish the plants, either trees or shrubs, with the understanding that they are to be planted and maintained by the highway forces.
At June 30, 1931, there had been planted approximately one hundred and six miles of roads, the ladies' organizations in the following counties contributing the plants and in many cases doing the planting:
Bibb County has planted four miles on the Central Dixie Highway in pecans with shrubbery between. The ladies have furnished marble markers with a bronze tablet to each making the road a Memorial to the World War Soldiers from Bibb County. The work is to continue. In cooperation with other counties the Bibb County ladies hope to get the Dixie Highway marked and planted from the Tennessee State Line to the Florida State Line, and to still further enlarge the scope to make this highway a Memorial from Canada to the end of the Florida Peninsula.
Chatham County has planted more than twenty miles of State and Federal roads. The Tybee road is planted the entire length of seventeen miles with palms and crepe myrtle.
Clarke County has planted four miles with oak and pine trees and will continue planting all paved routes.
Cobb County has planted about twelve miles with plants furnished by Cobb and Fulton County Garden Clubs.
DeKalb County has planted about five miles. Some trees are too close and will have to be thinned and transplanted.
Fulton County has one mile planted with water oaks by Mrs. Albert Thornton, Sr., on the Bankhead Highway.
Gwinnett County has three miles of water oaks, dogwood and poplar. Some trees are too close and will have to be transplanted.
Hall County has two miles in honeysuckles and roses for shoulder and bank protection.
Lamar County is the pioneer in roadside planting. Nut trees were set out by the property owners who maintain them and gather the yield.
Muscogee County has planted about twenty miles of water oak, myrtle, honeysuckle, and roses. Work has been outlined by the Maintenance Supervisor to plant trees, shrubs, and roses throughout this (third) Engineering Division.
Walton and Newton Counties have five miles of the highway east of Covington planted in Loblolly pines from seed furnished by the Forestry Board through the State College of Agriculture.
225
Richmond County has planted over five miles with Darlington oaks, Carolina cherry, and crepe myrtle.
Spalding County has twelve miles planted with crepe myrtle, most of the plants doing nicely, replacements will be made by State forces.
Sumter County has short stretches planted. Most of the trees have memorial markers denoting the object of the planting.
Terrell County has over fourteen miles on the Dawson-Cuthbert road planted with pecans.
Washington County has three miles planted between Sandersville and Tennille with seedling pines furnished through the State College of Agriculture.
In the early days of the Highway Department there were no funds provided for roadside planting, in fact, the counties had to raise funds independent of the State to match Federal Aid for road building. With the gradual increase of funds received through legislature enactment in assessing license tag fees and gasoline tax, the State is in position to enlarge its activities not only in road construction but in all that is allied with such work. Hence, with the cooperation of the Federal Government contained in the amended act of May 21, 1928, the State Highway Board passed a resolution to accept all contributions from civic organizations of water oak trees and other shrubbery of proper size and quality that were delivered free during the planting season at points designated. The State forces are to plant and maintain these trees and shrubs.
With the increased width of highway rights-of-way the new roads constructed (and being constructed) have broad shoulders, cuts and fills, so that there is a splendid opportunity for the landscape work of high class and beauty.
Through lack of space, only a brief summary is given above of the work done and projected by the different civic organizations in cooperation with the Board. The Board feels grateful and obligated to the ladies of these organizations, also, to Dr. T. H. McHatton, Horticulturist, and Mr. H. W. Harvey, Extension Horticulturist, (both of the State College of Agriculture) for their efforts and help in planning and carrying on the work.
Georgia soil and climate are adapted to the growth of any American flower, tree, vine, or shrub.
Two hundred years ago, Georgia was settled by a colony under General Oglethorpe and more has been done in the last twelve years for road construction than in all the preceding years. By persistent and systematic effort on the part of civic organizations in cooperation with the Highway Board our vision of the future leads us through veritable parks in traveling from one end of the State to the other.
226
ACCIDENTS REPORTED FISCAL YEAR ENDING JUNE 30, 1931.
There were fewer accidents reported for this period than for the calendar year 1929. However, that does not indicate that there was a smaller total. There are many minor accidents in which the personal injury and property damage are so slight as to never be reported to the Highway Department.
The accidents due to intoxicated drivers were 48 during the period above, against 67 for 1929.
While the accidents reported were fewer than in 1929, the fatalities and injuries were greater, the property damage was less, see below: Persons killed, 1929 ........ 114; Fiscal year, 1930-31 ....... 125 Persons injured, 1929 ...... 538 ;Fiscal year, 1930-31 ........ 581 Property damage, 1929 .... 155; Fiscal year 1930-31 ....... 77
There is no way to get an accurate report on motor vehicle accidents without a road patrol or constabulary. Pavements do not reduce serious accidents but rather tend to increase them on account of accelerated speed.
Following is a table of all accidents reported for the fiscal year ending June 30, 1931.
227
STATE HIGHWAY BOARD OF GEORGIA
ACCIDENTS JULY 1st' 1930, THROUGH JUNE 30th, 1931.
Cause of Accident
Col. with Col. with Col. with Drove Drove off Ran over AtR.R. Ran
mtr. veh. other veh. parked off or into a pedestrian cross- into an Total
in motion in motion vehicle rdwy. bridge
ing animal
Speeding ______
---
14
3
Reckless, careless driving ---
40
5
Driver intoxicated ____
12
1
Defective lights _____
10
5
Defective brakes ________
4
4
Defective strg. gear _____
-1
Passing car without right-of-
way ___________________ --
10
On wrong side of road _____
19
2
Blinded by bright lights ___
9
3
Tire blew out_ _____ --------- -
Skidded ______________
1
Wagon without lights
4
Failed to observe signs __ --
9
TotaL_
-
On curve ____ On straightway_ --
Persons killed ___ --Persons injured ____ -Property damage only ---
129
27
- - - - - - - -- -
49
2
80
25
------
43
7
216
27
-
30
6
1 11
----
2 1
-
2 3
---
1
21
5 16
6 36 5
65
8
5
4
1 101
36
11
9
2
4 118
34 - ----------
1
------
48
6
---
-
--
--- -
23
5
2
-.
------
-
16
14
---
15
---
2 8 7
2
179
65 114
---
-----
1
1
---- ----
1
--- -----
----------
---
----
------
23
16
10
2
13
14
------
--- .
---------- ---
-- -- -
-------
6
4 2
12
24
--
16
-
8
------- .
9
---
4
--
12
5 406
----
3 140 2 266
50
2
11
5
1 125
245
38
5
11
3 581
32
3
------
-- ----
1
77
ROAD INFORMATION AND MAPS. The Highway Board continues to issue a map of the State Road System, giving State and Federal Route numbers and different types of roads, also, roads under construction. These maps are revised monthly to show the changes in constructon and the state mileage added. Attached to the back of this report will be found a map issued in June, 1931, which will explain in detail the status of the road system. Also, distances between important points and detours are printed on the reverse side of the map. These maps are mailed out to numbers of cities, towns, garages, filling stations and individuals and are in great demand. Any one may obtain a copy on request. Further, the Maintenance Department is kept advised of condition of all roads every week and during storm and flood times and after tornado destruction special reports are received daily and frequently, several times a day, so that any one contemplating a trip can always be informed of the condition of the roads and the best route to pursue by 'phoning the General Office, Atlanta, or (if a resident of one of the Engineering Divisions) by 'phoning Division Headquarters. By comparing the June, 1931, map with State maps of former years, it will be noted that there is a greatly increased mileage of hard surfaced and semi-hard surfaced roads. Each month will show some betterment in the road system. Greater in summer than in winter, of course.
229
Proj. 5, Bacon County- Section of Limerock Road showing borrow from wide ditch
Proj . 5, Bacon County, West of Alma Note Number of Contractors Men on Shoulders
230
PART FIVE
MISCELLANEOUS INFORMATION
RAILROAD CLAIMS.
There have been few claims for damages and over-charges during the period covered by this report.
Most of our shipments of material originate either within the State or from nearby interstate points. The shippers with whom we deal and the transportation companies are familiar with the rates applying.
Our freight bills are carefully audited by a competent traffic manager and when he finds irregularities we almost invariably get the claims adjusted by dealing directly with the Railroad interested. It is very seldom that we have to apply to other sources for settlement basis.
All of our receipts of machinery, materials and supplies are for our own use. We do not deal in any commodity for resale.
WAREHOUSE.
The Warehouse is adjacent to the Shop, but it is operated as a separate and independent unit. All parts, tools and supplies are handled by the Warehouse for distribution on order to the Main Shop and the Division Shops. Other division tools and supplies are stocked and handled by the Warehouse. Automotive and road machinery are not handled by Warehouse, but shipped direct to destination from factory or East Point Shop.
The Warehouse at first was principally a storage building for such small tools, parts and supplies as were received from the Federal Government as "surplus war material." A small stock of current repairs and supplies were added. The stock of government goods has become exhausted through use, sale or exchange and has been gradually replaced by an increased stock of active merchandise. Some repairs and supplies are now bought in car lots which is a substantial saving in cost besides a saving in time. Orders are filled and put in the Depot the same day they are received.
Further, there is more floor space since the General Office has vacated the buildings at East Point. This additional space has been refitted to accomodate the expansion of the Warehouse. New steel bins and racks have been installed in the old office rooms. Elevating and lifting machinery have been put in to take care of the handling. With the increased storage facilities each type of merchandise can be kept to itself and its location can be easily identified by reference to the inventory cars which list the room number, section or rack number and bin number
232
that contain the article. The old warehouse space is utilized mainly in storing large stocks of heavy parts, supplies and grease.
All goods received and delivered are recorded on a perpetual card inventory system. Also, once a year a physical inventory is taken of the actual stock to confirm continuous inventory balances. A consolidated inventory total of warehouse stock at the close of this period will be found in the report of the Accounting Department.
Purchases of stock for the warehouse are made by the Warehouse Superintendent in connection or cooperation with the regular purchasing agent.
Sales from \Varehouse stock are not made on a basis of sales profit but are made at cost of the merchandise sold. A requisition and purchase order are required for the Divisions and a shop order specifying job number from the shop. Shipments and deliveries through the Warehouse amounted to a quarter million dollars for the year.
HIGHWAY MAGAZINE.
The name of the publication is "Georgia Highways." It is devoted to the interest of the Highways of the State and to the Traveling public.
The magazine contains articles written by men of experience in road building and economics. The information is of a high and dependable character. Much is reproduced from the file of other publications, including that of the Bureau of Public Roads at Washington. The cuts are not only illustrative of road work but are artistic and the scenic beauty of the State is taken into consideration.
These magazines are not only distributed to other states and organizations but copies are mailed to each Division office and are looked forward to with interest by the officials and employees who often find useful hints from the experiments and experience of Engineers of Construction and Maintenance in other Highway Departments as well as our own.
The map on the back of the magazine is changed periodically to reflect the progress of road construction and mileage betterment.
There are a number of subscribers but any one may obtain a copy of the magazine by request.
233
11 ~ liiuUProj. 474-B , Grady County, Cairo to Thomasville- Graded
Walker County, near LaFayette- %" Seal Coat on 2.)4"" Course of Amiesite over 2" Penetration
234
STATE HIGHWAY BOARD OF GEORGIA
DISTRIBUTION OF THE COUNTY FUND OF THE GASOLINE TAX OF ONE CENT PER GALLON FOR THE CALENDAR YEARS 1926-27~28~29 AND FOR THE FISCAL YEAR 193G-31.
County
Calendar Year Calendar Year Calendar Year Calendar Year
1926
1927
1928
1929
Fiscal Year 193G-31
Appling _____ --------- - - --- $
Atkinson _____ ---------- -----
Bacon _________ Baker ____ ----
---- ------- --
---
--
Baldwin ___
--- --------------
Banks ____
Barrow ___ B a r t o w ___ Ben HilL. Berrien ____
---
-
---------
- - -
Bibb _____ ------- - - - - - - - - - - -
-
Bleckley __
- ------- - ------
B r a n t l e y __
----
--
Brooks ___ ----
-
Bryan ___
---- --- ---
Bulloch ______ - ------------
Burke _____ --
--
Butts ______
C a l h o u n ___
Camden ___
Campbell
Candler ___
--
CarrolL ___
Catoosa __ .
Charlton ____
Chatham_
- ---
-------
Chattahoochee __ -- ..
-
Chattooga __________
----
Cherokee _______ ---- ---- -------
16,589.99 $
8, 157.77 9,629.67 3,816.94 11,226.22
7,983.15
7' 134.93 14,419.57
3,407.88 12,573.47 10,477.89 4,665.15 9,604.73
11,650.42 15,105.94 15,396.22
15,991.24 8,341.50 5,762.84
9,604.73 4,989.47 6,685.88
18,161.68 3,617.37 4,914.63
10,502.83 7,509.15 8,906.20
5,937.47
18,277.64 $ 10,542.39 10,955.44
4,446.11 13,105.86
8,601.63 8,456.33 16,520.59 3,923.04 15,110.95 12,965.44
6,538.05 10,083.56 13,599.86 18,539.98 18,423.74
18,772.45 9,181.81
7,177.70 12,379.36 5,811.91
7,787.95 21,126.28
4,213.63 5,579.43 I 12,234.06
8,709.37 10,287.08
9,061.18
18,723.67 $ 13,964.73 10,550.44 4,757.62
13,225.23 9,071.91
9,977.55 18,452.20 4,131.17 15,637.70 14,629.71
8,759.25 9,626.71 20,168.38 19,388.30 19,513.19
23,438.11 9,655.82
7,477.33 12,887.97 6,149.59
8,251.89 22,332.78 4,359.53
5,951.59 12,945.81
11,071.17 10,495.22
11,365.58
20,762.99 $ 12,857.98 11,033.70 5,405.16
14,959.79 9,950.63 11,294.32 19,048.41
4,501.82 17,298.54 14,990.48 7,525.00 9,214.15
19,654.05 20,815.10 21,627.40
23,365.01 10,511.80 7,965.33
14,323.49 6,799.60 9,155.27
24,670.12 4,551.24
6,511.23 14,316.73 12,807.22 10,926.06
10,437.65
19,284.52 16,236.14 10,217.52 10,237.90
13,816.91 9,190.44 10,565.77
18,594.49 4,157.90 17,555.59 15,368.97
10,136.04 8,496.35 22,960.46 19,267.24 20,501.81
25,893.30 9,708.74 12,491.63
13,227.89 6,280.13
8,455.82
22' 785.40 4,202.26
6,013.79 18,481.55 11,828.77
10,107.16 12,973.04
STATE HIGHWAY BOARD OF GEORGIA DISTRIBUTION OF THE COUNTY FUND OF THE GASOLINE TAX OF ONE CENT PER GALLON FOR THE CALENDAR
YEARS 1926-27-28-29 AND FOR THE FISCAL YEAR 1930--31.-Cont'd.
--------~:u~:~----------~--~alen1~~~ Year Cale~1~~~ ~ea~--~-C~len1~~~ Year _oalen1~~Y-e_a_r _ ~i_sf_:_io.-_Y3_e1-a_r_
Clarke__
__
$
Clay_____
1
Clayton______
Clinch______
Cobb_____ _____
Coffee
Colquitt____
_
Columbia _
Cook___
Coweta _
~ Crawford__
a> Crisp_ _
_
Dade
Dawson____
Decatur___
DeKalb__
Dodge__
_ _ _ _ _ _ _ _ _ _ _ _ _
Dooly______
___
Dougherty_
Douglas __ .
Early___
Echols____
Effingham______
Elbert____ __________
EmanueL____
___
Evans_____ ______
Fannin__
__ ______ _____
Fayette___
Floyd__ ___________
8,107.89 $ 9,205.58 7 ,302. 31 5,862.64 12,822.94
8,781.56 15,546.97 8,881.26 5,383.68 16,140.93 11,625.46 11,151.46 6,012.31 2,644.43 14,319.78 8,630.34 9,080. 83 8,382.21
8,257.58 4,590.30 7, 808.51 4,590.30 8,806.43 12,523.57 27,267.46 3,293.05 7,384.41 5,962.41 11,600.52
9,153.75 $ 10,903.22 8,485.38 6,741.81 14,894.47
9,909.30 17,377.61 10,083.66 6,247.80 18,685.29 13,416.69 12,960.56 7,291.34 3,051.24 15,604.97 11,071.68 11,327.01 10,199.90
10,199.90 5,463.19 9,095.63 5,288. 84 10,258.02 15,111.28 31,762.06 3,835.86 8,456.33 6,916.17 13,861.40
9,148.43 $ 11,530.05 8, 914.58 13,375.34 15,883.59
10,345.91 18,715.57 10,593.79 7,768.99 21,217.80 13,912.54 13,146.48 8,505.17 3,243.55 17,079.71 11,576.83 13,765.19 13,182.73
10,211.24 5,758.97 9,417.89 5, 761.40
10,813.44 18,763.29 32,899.40 4,044.63 8,859.16 7,291.72
18,207.97 I
9,096.82 $ 12,219.58
9, 683.25 13,128.29 17,974.11
11,240.15 21,586.78 11,507.54
8,763.91 22,592.06 15,338.87 14,822.37 8,475.39 10,960.58 18,409.35 12,424.75 13,137.27 12,717.77
10,786.62 6,308.83 18,919.73 6, 955.29 11,845.99 17,061.14 36,301.87 4,433. 78 9,716.41 7,990.97 20,881.78
9,556.18 11,694.66 8, 943.48 21,113.03 16,576.59
10,377.19 24,345.26 10,628.39 13,901.31 23,285.55 14,167.02 13,013.25 7,533.65 10,123.23 17,002.92 10,823.18 15,157.96 14,227.97
9,408.08 5,826.86 17,474.32 8, 377.67 10,940.99 20,766.45 33,528.51 4,683. 77 10,257.39 7,380.49 24,694.44
STATE HIGHWAY BOARD OF GEORGIA
DISTRIBUTION OF THE COUNTY FUND OF THE GASOLINE TAX OF ONE CENT PER GALLON FOR THE CALENDAR YEARS 1926-27-28-29 AND FOR THE FISCAL YEAR 1930-31.-Cont'd.
County
Calendar Year Calendar Year Calendar Year Calendar Year
1926
1927
1928
1929
Fiscal Year 1930-31
~-~--~--~----~
F o r s y t h ____
----- $
Franklin ___
---
Fulton ______
--
Gilmer ______
G l a s c o c k ____ Glynn _____
Gordon ____
Grady ____
Greene ____
Gwinnett__
Habersham_ HalL _____
Hancock ___
Haralson __
Harris ____
Hart ________
Heard _____ Henry ______
--
-
Houston ____
Irwin _____
Jackson_
Jasper__
Jeff Davis
Jefferson_
Jenkins __
Johnson_
Jones ____
Lamar_
Lanier__
---- --
7,459.26 $ 12,174.31 10,228.41 6,860.52 2, 719.26 14,993.35 15,392.52 7,060.10 13,076.41
15,816.61 9,455.05 15,192.94
13,222.09 9,330.31 5,888.57
10,303.26 5,313.79
7' 833.46 15,617.04
10,253.36 11,400.93 11,575.57
6,336.63 16,016.20 9,654.62 4,041.48
13,022.52 7,209.78 4,764.94
8,369.14 $ 15,575.90 11,450.94
7,090.52 3,341.85 15,267.26
17,487.14 8,485.38 15,198.13
19,644.24 12,001.59 17,755.37
15,779.33 10,432.38 8,512.63 11,914.40
6,189.68 10,267.32
18,801.55 12,611.85 13,193.05
14,685.67
8,659.75 18,510.92 11,264.04
4,895.06 14,820.37 8,165.72
7,231.08
8,799.71 $ 15,427.99 11,945.46 8,852.69 3,531.43 16,434.52 17,520.12 8,855.12 17,686.88 22,077.70 12,529.42 20,364.49 17,399.97 11,152.76 11,743.64
11' 762.25 9,250.81 12,947.39 19,924.69 12,922.16 16,943.14 17,406.92 8,299.42 19,464.14
11' 999.06 5, 124.71 15,679.73 9,811.87 10,762.66
9,578.33 $ 15,044.44
13,165.98 8,897.36
3,892.26 18,128.09
19,008.09 9, 940.48 18,659.22 23,503.13
13,392.73 25,876.39 21,255.10 11,809.10
9,363.99 11,443.29 8,423.09
11,529.19 21,601.67
14,377.66 18,332.29 16,897.56
9,058.12 21,525.86 13,538.28
5,471.50 17,113.07
9,952.99 8,555.27
8,846.57
16,111.39 5,096.09 11,057.28
4,493.19 16,762.29
17,562.53 17,511.84 18,849.76
22,654.10 12,369.58 23,899.50
19,631.26 10,892.74
13,616.84 13,174.10 12,244.52
14,051.36 19,953.42
13,279.23 18,151.54 18,834.14
8,214.40 28,133.97 12,503.99
9,601.82 15,770.01
10,121.98 13,167.02
STATE HIGHWAY BOARD OF GEORGIA
DISTRIBUTION OF THE COUNTY FUND OF THE GASOLINE TAX OF ONE CENT PER GALLON FOR THE CALENDAR
YEARS 1926-27-28-29 AND FOR THE FISCAL YEAR 1930-31.-Cont'd.
County
I I Calendar Year Calendar Year I Calendar Year Calendar Year
Fiscal Year
1926
1927
1928
1929
1!)30-31
---------~---------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Laurens_ Lee__ Liberty__ Lincoln__ Long____ Lowndes_____
$
19,658.50 $
22,779.40 $
23,481.79 $
25,662.82 :$
23,702.26
5,338.73
6,247.81
6,781.06
7,250.08
7,127.55
8,556.94
9,967.41
10,548.96
11,778.29
10,873.27
5,089.26
6,721.23
8,680.14
7,284.26
10,190.75
11,700.31
13,628.92
14,313.65
15,535.17
14,298.18
17,188.74
20,660.17
23,112.96
22,279.81
23,348.08
Lumpkin Macon_____ Madison___ Marion_____
10,677.47 12,673.26 12,149.36 8,956.10
13,163.98 14,994.71 13,861.40 10,025.54
13,990.40 15,845.40 16,139.45 10,527.95
15,636.71 17,464.37 14,127.91 11,693.69
14,442.10 16,130.15 18,427.76 10,800.33
"" McDuffie_
85 Mcintosh___
Meriwether___
Miller____
7,858.41 10,328.20 13,696.10 3, 841.89
9,328.11 12,030.65 15,724.47 4, 649.54
9,706.07 10,360.88 17,273.57 4,867. 76
10,932.17 11,148.09 17,886.82
7, 710.05
12,880.47 10,301.76 17,434.85 14,618.12
Milton_ Mitchell Monroe__ Montgomery Morgan___ Murray__ Muscogee_ Newton__ Oconee___
2,494.73 13,097.36 10,253.36 5,887.57 9,779.37 9,604.73 10,053.79 6,565.48 9,135.63
2,964.08 15,023.78 11,885.35 6,770.87 12,628.81 11,013.56 12,240.10 8,013.89 10,926.37
3,114.53 15,886.62 13,280.90 7,659.10 14,834.62 13,636.85 14,089.61 10,082.19 11,516.18
3,384.57 17,107.64 13,818.86 7,904.32 14,380.99 13,722.05 12,982.07 10,979.60 12,610.90
3,126.00
17' 176.11 13,616.20
7,303.68 16,098.89 16,136.32 15,778.78 12,560.26 11,647.46
Oglethorpe Paulding__ Peach_____
4,739.78 4,949.58 7, 159.89
5,724.73 5,928.14 8, 194.78
14,531.58 7,012.38 7, 995.54
10,101.19 7,003.69 9,558.02
18,287.08 6,481.31 9,007.25
Pickens_
7, 783.58
9,020.54
10,636.60
15,203.48
14,034.19
Pierce____ Pike___
::1 -::: __ ::: ___
5,463.47 9,554.84
6,393.10 11,100.73
6,664.01 12,069.16
7,408.82 12,807.70
6,843.29 12,087.74
STATE HIGHWAY BOARD OF GEORGIA
DISTRIBUTION OF THE COUNTY FUND OF THF. GASOLINE TAX OF ONE CENT PER GALLON FOR THE CALENDAR YEARS 1926-27-28-29 AND FOR THE FISCAL YEAR 1930-31.-Cont'd.
County
I Calendar Year Calendar Year Calendar Year
1926
1927
1928
--------
- - - - - - - - - - - -----~--------- - - - - - - - - - - - - ---- ---
-
------ ----
Polk __
-
-$
10,328.20 $
11,914.40 $
12,657.39-
Pulaski__ Putnam ___
Quitman ___
1
10,203.45
I
14,120.19
--
9,105.79
12,175.94 16,418.63 10,664.85
15,260.22 17,933.67
11' 306.16
Rabun ____
10,682.77
12,175.94
12,724.28
Randolph_
9,529.88
11,320.16
12,005.11
Richmond
14,768.84
17,203.24
18,321.25
Rockdale __
2,295.16
2,615.36
2,760.02
Schley ___ Screven ____ ----
:i
7,035.16 7,559.05
8,485.38 8,805.04
8,929.88 12,496.27
Seminole ___
I
3,942.64
4 039.28
4,264.82
Spalding
9,978.94
11,391.54
11,980.96
Stephens __
6,236.85
7,497.37
7' 842.19
Stewart ___
16,989.14
19,847.66
21,871.52
Sumter__
14,394.62
16,554.03
22,032.72
Talbot ___
11,525.68
13,396.44
14,145.48
Taliaferro_
3,168.32
3,748.67
3,970.19
Tattnall
17,188.73
20,022.02
21' 110.11
Taylor __
8,606.84
10,731.44
10,361.72
Telfair_
8,806.43
10,684.85
11,271.74
Terrell _
8,157.78
9,647.77
10,176.24
Thomas_
15,796.58
17,697.26
20,405.20
Tift _____
11 '700. 31
14,239.17
14,530.18
Toombs_
11,450.83
12,844.32
13,143.04
Towns_
7,085.05
8,281. 96
8,758.89
Treutlen_
3, 941.69
4,591.41
4,851.88
Troup ___
13,471.57
15,750.27
16,843.75
Turner ___
6,511.26
7,700.77
8,112. 69
Twiggs_
--
7,783.58
10,764.58
14,100.07
Calendar Year 1929
------
-
1$
13,965.42
15,107.08
19,901.27
12,407.83
13,636.43
13,226.90
19,871.15
3,031. 91
9, 741.81
11,653.46
4,636.86
13,050.90
8,424.19
22,998.15
20,529.85
15,516.89
4,399.94
23,306.15
11,426.31
12,265.00
11,279.42
22,659.68
15,738.25
14,553.65
9,673.10
5,347.62
19,109.28
8,873.66
12,271.79
Fiscal Year
1930-31
- - - - - - - - - - - -
$
12,853.62
16,885.92
18,380.86
11,459.92
12,594.65
12,216.40
19,828.70
2,800.28
8,997.57
14,410.85
4,970.33
12,064.33
7,841.15
21,241.16
23,938.88
14,331.44
4,063.79
21,525.61
10,553.36
11,308.85
10,127.58
22,851.03
15,017.29
13,452.50
8,934.10
4,939.08
17,649.38
8, 195.75
16,067.01
-I
STATE mGHWAY BOARD OF GEORGIA
DISTRIBUTION OF THE COUNTY FUND OF THE GASOLINE TAX OF ONE CENT PER GALLON FOR THE CALENDAR YEARS 1926-27-28-29 AND FOR THE FISCAL YEAR 1930---31.-Cont'd.
County
Calendar Year Calendar Year Calendar Year Calendar Year
1926
1927
1928
1929
Fiscal Year 1930---31
Union ______ ---- ----- ------ -- $
Upson ___
--- -- ---------
Walker _____ - ------
----- -----
Walton _____
------------- -
Ware ______ --
Warren _____
Washington ---
-
Wayne ______
Webster _____
----
Wheeler ____ -
--
White _________
----- --------
Whitfield ______ ---------- ------
Wilcox ______
------------ ---
Wilkes ____ ---
--
----- .... -
Wilkinson ___ -- -- ------- -----
Worth ___ ----- -- --- ------- --
11,425.88 $ 6,734.11
11,600.52 11,126.52 18,510.93 10,003.89 15,018.30 14,968.40 6,286.73 11,750.20 4,116.31 6,461.37 10,802.21 12,997.58 10,827.14 14,120.19
13,018.67 $ 7,584.55 13,425.50 12,543.72 21,358.76 11,710.99 17.784.42 17,290.42 7,119.59 13,861.39 7,206.76 7,397.13 12,960.56 14,733.18 12,757.12 16,447.68
13,700.62 $ 14,041.14 13,377.21 13,657.04 23,030.45 12,017.13 18,717.76 17,813.88 7,432.68 14,681.04 6,881.30 10,339.19 13,695.82 14,755.09 13,485.20 17,272.98
14,946.26 $ 11,206.08 14,233.14 15,282.77 26,941.18 13,369.05 20,747.41 19,310.34 8,160.22 15,629.61 6,292.51 12,094.12 14,990.28 17,430.54 14,861.31 18,740.38
13,804.39 19,328.05 10,727.38 14,118.88 24,813.34 13,395.59 19,162.36 17,762.97 7,536.78 14,435.56 7,658.69 14,469.51 13,845.04 16,098.89 13,725.94 17,308.64
Totals ______ ----- ----- -- --- $ 1, 559,917.47 $ 1,838, 691.90 $ 2,035,222.44 $ 2,180,009.34 $ 2,223,857.37
Increase 1927 over 1926 ____ ------- ------------------
278,774.43
Increase 1928 over 1927___ _______ --- ------------- ------------------
Increase 1929 over 1928 ___________ ---- ---- - -- --
---- ... ------- ---
Increase Fiscal Year 1930---31 over Calendar year 1929_ . -- . -- --------
196,530.54
. ----- --- --
------------
144,786.90
----------------- -
43,848.03
Note: Calendar years 1926-27-28-29 were compiled by usmg last quarter of precedmg year and three quarters of current
year. Fiscal year 1930---31 was compiled from the four quarters comprising the actual period from July 1st, 1930, through June
30, 1931.
The foregoing table does not show the distribution of one cent gas tax to the counties for first six months of 1930 which
totalled $1,090,395.34.
For detail, see twelfth report, pages 171 through 178.
Proj . 145, Montgomery County, East of Mt. Vernon Concrete Paving and Bridge
Proj . 41-B, Austell- Cobb County 241
STATE HIGHWAY BOARD OF GEORGIA
APPORTIONMENT OF ORIGINAL AND ADDITIONAL FEDERAL AID FUNDS TO THE STATES FOR FISCAL YEAR ENDING JUNE 30, 1931.
States Arranged
Alphabeticau~
!
I Original
I Apportion-
1
ment
I
-
'
Addil;ional I
Apportion- II ment
Total1931
------------------,
Alabama __ _
1,557,372.oo -~038,248 ool$- -~59~5;;0oo
Arizona
1,062,190.00 708,127.00 1'770, 317.00
Arkansas __
1,293,086.00 862,057.00 2, 155,143.00
California_
2,501' 170.00 1,667,447.00 4, 168,617.00
Colorado __ _
1,390,524.00 927,016.00 2,317,540.00
Connecticut_
477' 893.00 318' 596. OO!
796' 489.00
Delaware __
365,625.00 243,750.00
609,375.00
Florida_
921,558.00 614,372.00 1,535,930.00
Georgia ___ _ Idaho ___ _
1,985,632.00 1,323,755.00 932,594.00 621 '729 .00
3,309,387.00 1,554,323. 00
Illinois
3,100,781.00 2,067,187.001' 5,167,968.00
Indiana_
1,909,505.00 1,273,003.00 3,182,508.00
Iowa __
2,005,944.00 1,337,296.00 3,343,240.00
Kansas __ _
2,048,585.00 1,365,723.00 3,414,308.00
Kentucky_
1,414,610.00 943,073.00 2,357,683.00
Louisiana_
1,040,195.00 693,463.00 1,733,658.00
Maine ___ _
675,106.00 I 450,071.00 1, 125,177.00
Maryland __
631' 911.00 421,274.00 1,053,185.00
Massachusetts_
1,090,022.00 726,682.00 1,816,704.00
Michigan __
2,200,177.00 1,466,785.00 3,666,962.00
Minnesota __ _
2' 102,986.00 1,401' 991.00 3 ,504, 977.00
Mississippi
1,323,897.00 882,598.00 2,206,495.00
MissourL
2,382,383.00 1,588,255.00 3,970,638.00
Montana __ _
1,552,865.00 1,035,243.00 2,588,108.00
Nebraska __
1,586,526.00 1,057,684.00 2,644,210.00
Nevada ___ _
960,845.00 640,563.00 1,601,408.00
New Hampshire __ _
365,625.00 243,750.00
609,375.00
New Jersey __
936,234.00 624,156.001 1,560,390.00
New Mexico_
1,190,296.00 793,531.00 1,983,827.00
New York __
3,605,965.00 2,403,976.00 6,009,941.00
North Carolina_
1,722,673.00 1,148,449.00 2,871,122.00
North Dakota_
1,203,060.00 802,040.00 2,005,100.00
Ohio __
2,753,528.00 1,835,685.00 4,589,213.00
Oklahoma ____ _ Oregon _____________ _
1,751,015.00 1,167,343.00 1,197,667.00 798,445.00
2,918,358.00 1,996,112.00
Pennsylvania _______ _
3,314,707.00 2,209,805.00 5,524,512.00
Rhode Island ___ _
365,625.00 243,750.00
609,375.00
South Carolina __
1,065,105.00 710,070.00 1' 775' 175.00
South Dakota _____ _
1,232,962.00 821,975.00 2,054,937.00
Tennessee_
1,608,802.00 1,072,535.00 2,681,337.00
Texas ___ _
4,545,830.00 3,030,554.00 7,576,384.00
Utah __ _
850,752.00 567,168.00 1,417,920.00
Vermont_ __ _
------II 365,625.00
Virginia __________ Washington ___ _
_
~~==::I
1,429,253.00 1,156,219.00
243,750.00 952,835.00 770,812.00
609,375.00 2,382,088.00 1,927,031.00
West Virginia __ _
792,826.00 528,550.00 1' 321 '376. 00
Wisconsin _____ _
1,849,lu9.oo 1,232,78o.oo 3,081,949.00
Wyoming __ _
942,455.00 628,303.00 1,570,758.00
United States ___________ -,$72, 759,375.00 1$48,506,250.00$ 121,265,625.00
HawaiL _______________ --~ 365,625.00 243,750.00
609,375.00
To~l __________________ $73, 125,ooo oo $48, 75o.ooo .oo $lli,87~000.oo
242
STATE HIGHWAY BOARD OF GEORGIA. CURRENT STATUS OF FEDERAL AID AND EMERGENCY CONSTRUCTION
AS OF JUNE 3::>, 1931. TEN SOUTHEASTERN STATES.
Under Construction
STATE
Completed Mileage Estimated
Total Cost
Federal Aid Allotted
Emergency Adv.Fund
Initial
Alabama ___
--------- 2' 115.8 $ 7,537,014.55$
Florida._
- -----
540.0 1,041,247.28
GEORGIA ___
--- 2,795.0 9,004,537.89
Kentucky ____
-------- 1,519.0 7,439,643.91
Louisiana ___
------- 1,418.9 8,422,172.79
Mississippi__
------
1,772.7
4,089,403.10
North Carolina. - - --- 1,970.6 6,565,115.87
South Carolina ----------- 1,863.5
Tennessee_
-------- 1,461.4
5,423,297.93 4,542,803.15
Virginta__
----- -----
1,624.7
5,833,992.87
- - - - - - - - - - - - - - - - - ---~-----
Totals____ __________ 17,081.6 $59,899,229.34$
3' 671' 288.23 $ 519,869.13
4,302,306.86 3,259,483.02 4,005,813.00 2,013,896.18 3,126,179.57 2,467,109.74 2,237,133.62 2,810,606.22
28,413,685.57$
1,584,430.71 400,000.00
1,818,777.17 1,195,190.78 1,137,927.00 1,401,409.53 1,626,473.82 1' 114,636.00 1' 741 ' 881. 99 1'457' 181. 72
13,477,908.72
236.7 52.6 303.1 284.4 245.9 182.0 213.1 78.2 193.7 260.9
2,050.6
Mileage
Stage
Total
114.8
351.5
----1--1-3-.-8---
52.6 416.9
131.1
415.5
19.3
265.2
80.5
262.5
35.4
248.5
152.8
231.0
17.4
211.1
46.2
307.1
-----------
711.3
2, 761.9
Note-Stage Mileage refers to mileage already constructed to which betterment work is approved for additional Federal Aid.
STATE HIGHWAY BOARD OF GEORGIA. CURRENT STATUS OF FEDERAL AID AND EMERGENCY CONSTRUCTION
AS OF JUNE 30, 1931. TEN SOUTHEASTERN STATES.
--
Approved for Construction
STATE
---~----~-----
Alabama_
I$
Florida ______
GEORGIA _____
Kentucky ____
Louisiana____ --MississippL _____
North Carolina ____
South Carolina ___
Tennessee __ -- - Virginia_____ -----
Totals_ --- $
Mileage
Estimated Federal Aid Emergency
I
rotal Cost
Allotted
Adv.Fund
Initial
Stage
- - - ---~~-----
--~~--- - - - - - - - - - - - - -
93,312.53$
46,656.26$
34,691.58
1.4
2.7
102,816.84
51,408.41
13,258.00
13.3
1,555,393.35
730,085.16
48,300.00
77.7
-----
- - --
18.2
880,912.21
428,092.96
239,600.00
60.8
120,355.82
58,515 30
10,000.00
5.1
19.8 .6
i
402,117.91
291,056.90
30,908.89
2.5
J8.3
1,023,038.04
503,233.00
233,527.76
29.0
36.4
512,582.94
254,606.69
37,000.00
15.1
47.1
380,641.70 497,760.77
190,320.64 ------------ ----
246,236.51
6,200.00
26.0 18.4
---- ----- - - --
.6
5,568, 932.11 $ 2,800,211.83$ 653,486.23
249.3
--~-------
143.7
Total
4.1 13.3 95.9 80.6 5.7 20.8 65.4 62.2 26.0 19.0
393.0
Note-Stage Construction refers to mileage already constructed to which betterment work is approved for additional Federal Aid.
STATE HIGHWAY BOARD OF GEORGIA
APPORTIONMENT OF FEDERAL AID TO TEN SOUTHERN STATES SHOWING AMOUNT AND RANK FOR FISCAL YEAR 1931.
States
I
1931
States Arranged I 1931
Alphabetically Apportion- Rank by Numerical Apportion-
Arranged , ment
Rank
ment
------- ---1---------1------------------
Alabama_
__I$ 2,595,620.00 1 Georgia_ ______ __ $ 3, 309, 387. 00
Florida_
_1 1,535,930.00 2 North Carolina___ 2,871,122.00
Georgia .
3, 309, 387. 00 3 Tennessee____
2,681,337.00
Kentucky___
2,357,683.00 4 Alabama____
2,595,620.00
Louisiana_ ___
1, 733 , 658. 00 5 Virginia____
2,382,088.00
Mississippi______ 2, 206,495.00 6 Kentucky__ ___ 2,357,683.00
North Carolina__ 2,871,122.00 7 Mississippi
2,206,495.00
South Carolina__ 1,775,175.00 8 South Caroli'la __ 1, 775,175.00
--1 Tennessee ________ . 2,681,337.00 9 Louisiana
Virginia____
2,382,088.00 10 Florida___
1 ,733 ,658. 00 1,535,930.00
Total, l93L ____ -1$23,448,495.001
Tot~J, 193L __ $23,448,495.00
ROAD AND BRIDGE CONTRACTS LET FIRST SIX MONTHS-1930 FIRST SIX MONTHS-1931-10 SOUTHEASTERN STATES
STATE
1st Six
I Mos. 1931
Mlost. S1i9x30 Inov"e"r "191309311uDn'd"e'"r"'11993301
-------
Alabama______ $ 3,174,022.00$ 283' 141.00$ 2,890,881.00 -------------Florida _______ 3,072,182.00 2,220,093.00 852,089.00 -------------Georgia _______ 8,345,000.00 5,200,000.00 3,145,000.00 -------------Kentucky ____ 4,962,396.00 6,156,373.00 -------------- $ 1,193,977.00
Louisiana ____ 43,386,305.00 7,801,483.00 35,584,822.00 --------- ---
Mississippi_ __ 2,812,000.00 327,000.00 2,485,000.00 --------------
North Carolina ________ 5,450,225.00 3,279,385.00 2,170,840.00 ----- --------
South Caro-
lina ________
Tennessee ____ Virginia ______
3,462,286.00 10,182,179.00 -------------- 6,719,893.00 3' 131,897.00 ll ,031' 124.00 -------------- 7,899,227.00 3,288,272.00 4,101,702.00 -------------- 813,430.00
-----
Totals ______ $81,084,585.00 $50,582,480.00 $47,128,632.00 $16,626,527.00
Net Inc'rease 1931 over 1930 ____ ----------$30,502,105.00
245
STATE HIGHWAY BOARD OF GEORGIA EMPLOYEES ON STATE HIGHWAY SYSTEMS-JUNE 30, 1931,
AND RATIO TO TOTAL POPULATION OF TEN SOUTHEASTERN STATES.
STATE
State
Employees
-------------------
Alabama ___
---
Florida ______
--- ----
Georgia ___________ -
Kentucky _______
L o u i s i a n a ________ --
Mississippi__ _____
1,660 No Report.
3,372 4,206 4,000 1,240
North Carolina ____
4,000
South Cawlina __ --
Tennessee ___
-----
Virginia _____
1,452 1,801 3,000
Totals
24,731
Contractor
Total
State
Contract
Employees Employees
Ratio
Ratio
------------ ----------
2,166
3,826
1,594
1,222
4,630 5,677 12,640 2,300 2,500 3,937
933 2,600
-----
37,383
8,002 9,883 16,640 3,540 6,500 5,389 2,734 5,600
62' 114
863 622 525 1,620 793 1,197 1,453 807
899
628 461 166 874 1,268 442 2,804 931
------
595
Average Total
Population
692
363 265 126 568 488 323 957 432
358
1930 Population
2,646,248 1,468,211 2,908,506 2,614,589 2,101,593 2,009,821 3' 170,276 1,738,765 2,616,566 2,421,851
22,228,215
STATE HIGHWAY BOARD OF GEORGIA
GALLONS GASOLINE TAXED BY STATES IN U. S.
1929-1930
Increase
STATE
Gals. 1929
Gals. 1930
or Decrease
Tax Rate Rate End Tax New
1930
1929
1930
1931
------------------------------------1----------------
Alabama ________________ _
178,162,903
172,537,281
-5,625,622
4
Arizona ___________________ _
63,995,783
66,750,478
2,754,695
4
4 4
5
Arkansas _____________ _
133,620,566
128,545,469
-5,075,097
5
5
6
California_______ ______ _
1,139,736,244
1,162,337,545
22,601,301
3
3
Colorado ________________ _
141,466,891
153,620,645
12,153 '754
4
4
Connecticut _____________ _ 202,354,590
223,296,627
20,942,037
2
2
Delaware_______________ _
31,198,248
33,778,561
2,580,313
3
3
Florida __________________ _ GEORGIA ______________ _
223' 373' 467 219,609,473
227,036,915 223,184,648
3,663,448
6
3,575,175
6
6 6
7
Idaho ____________________ _ ~ Illinois __________________ _
48,658,984 388,659,266
54,422,752 915,747,319
5,763,768 527,088,053
4
*3, 5 mo.
5
3
Indiana_________________ _ Iowa ____________________ _
410,936,759 311,859,516
428,968,653 352,802,277
18,031,894 40,942,761
4
3t
4
3
Kansas __________________ _ 288,716,546
304,016,374
15,299,828
3
3
Kentucky ________________ _ 154,717,831
168,294,655
13,576,824
5
5
Louisiana ________________ _ 176,645,631
184,781,753
8,136,122
4
5
Maine ___________________ _
91,610,422
102,737,416
11,126,994
4
4
5
Maryland ___________ _ Massachusetts _____ . _____ _
157,429,197 487,940,778
174,779,706 528,147,350
17,350,509 40,206,572
24e
4 2
Michigan _______________ _ 710,300,302
722,462,626
12,162,324
3
3
Minnesota_ ____________ __ 338,631,771
345,303,709
6,671,938
3
3
Mississippi__ ___________ _
140,902,401
135,823,574
-5,078,827
5
5
Missouri_ ______________ _
384,033,575
431,958,060
47,924,485
2
2
Montana ______ _
57,514,249
58,837,575
1,323,326
5
5
Nebraska ________________ _ 208,869,358
226,510,543
17,641,185
4
4
Nevada __________________ _
16,307,535
16,875,292
567,757
4
4
New Hampshire __________ _
56,676,294
62,486,940
5,810,646
4
4
NewJersey ____________ _ New Mexico ____________ _
498,063,808 45,479,332
546' 685' 108 54,385,614
48,621,300 8,906,282
52e
3 5
STATE HIGHWAY BOARD OF GEORGIA GALLONS GASOLINE TAXED BY STATES IN U. S.-Cont'd.
1929-1930
STATE
Gals. 1929
--
New York* ________ -- ----
North Carolina __ ----- --
N O
hoiroth__D__a_k__o_t_a____-
-
-
-
-
----
Oklahoma _______ ----
Oregon __________
------
-
Pennsylvania __ -------
Rhode Island_ .
South Carolina __ --South Dakota __
Tennessee ____ Texas _________
U t a h ___________
Vermont _____
---
V i r g i n i a . ____
Washington_ --- ---West Virginia __
W i s c o n s i n _______
Wyoming _____________
---
--
---
District of Columbia_ ----
Total Gallons ___ ----
962,601,285 260,210,528 71,591,708 910,154,885 314,388,292 152,090,900 1,047,914,175 77,826,879 118,038,130 88,644,138 194,497,225 761,421,692 56,546,967 43,990,554 197,898,821 233,333,570 121,654,788 374,251,957 34,242,816 71,409,032
13,400,180,062
Gals. 1930
1,438,582,716 250,669,089 65,643,460 927,036,272 302,310,488 154,986,497 928,842,534 86,612,980 119,071,835 87,597,064 214,383,900 738,177,457 60,137,811 46,998,012 215,501,157 241,774,964 133,965,701 415,742,027 36,175,118 79,984,431
14,751,308,978
Increase
or Decrease 1930
Tax Rate 1929
475,981,431
2~, 8 mo.
-9,541,439
5
-5,948,248
3
16,881,387
4
-12,077,804
4
2,895,597
3
--119,071,641
4
8,786,101
2
1,033. 705
6
-1,047,074
4
19,886,675
5
-23,244,235
4f
3,590,844
31
3,007,458
4
17,602,336
5
-8,441,394
3
12,310,913
4
41,490,070
2
1,932,302
4
8,575,399
2
-----
1,351,128,916 i Increase.
Rate End 1930
2 5 3 4 4 4 4f 2 6 4 5 4 3!f 4 5 3 4 2 4 216
Tax New 1931
-
-- --- -------
6 516
---
-
5
- ------ -----
-
----
---------- --
------ - - ------ ------------- - ---
4
- --- --
-- ----- ----
- ------
-
---
--- ---
I -- ----- --
-- --------
-----
-- -
STATE
STATE HIGHWAY BOARD OF GEORGIA DISTRIBUTION OF GAS TAX EXPENDITURES BY STATES
For 1929 and 1930.
Expended-For Constr. Maint. State and *Collection Costs-City State and County
---~cal Roads _ _ ~reet!>_ Schools, Miscel. Road Bond Payments
Total
1929
1930
1929
1930
1929
1930
1929
1930
-------- ---------- -------1- ------ ------ --------- -------------1---
Alabama. _____________ $ 5,889,470$ 5,397,971$ 37,853$ 34,064$ 1,177' 686$ l ,469,457$ 7,105,009$ 6,901,492
Arizona____ _
2,559,839 2' 670,019
2,559,839 2,670,019
Arkansas _____________ _ 4,616,591 4,505,108
33,405
119,410 2,031,033 1,802,755 6,681,029 6,427,273
California__ .
34,141 '933 34,818,594
50,154
51,532
34,192,087 34,870,126
Colorado_______ _
5,055,282 5,907,374
162,782
237,452
5,218,064 6,144,826
Connecticut __ _
4,097,175 4,515,063-
4,097,175 4,515,063
Delaware__ _
935,9471 864,170
149,187
935,947 1,013,357
"" Florida ___ _
7 ,210, 967 5,297,528 5,020,369 3,816,909
4,540,738 12,231,336 13,655,175
~ Georgia____ ____ _
8,762,454 ll' 192' 385 1,461,654 2,242,677
10,224,108 13,435,062
Idaho __________ _
1,932,546 2,674,080
13,813
21,173
35,609 1,946,359 2,730,862
Illinois__ __. __
11,634,778 27,410,696
25,000
61,724
11,659,778 27,472,420
Indiana__ _
14 603,848 16,048,009 1,006,692 1,110,825
15,610,540 17,158,834
Iowa ______ _
9,324,067 10,551,544
31,728
32,524
9,355,795 10,584,068
Kansas ___ _
8,171,205 9,120,491-
8,171,205 9,120,491
Kentucky___ _
7,716,787 8,386,369
25,777
28,364
7,742,564 8,414,733
Louisiana___ _
5,255,782 5,543,453
155,178 1,722,869 1,847,817 6,978,651 7,546,448
Maine __ _
3,682,630 4,140,043
26,052
28,847
3,708,682 4,168,890
Maryland __ _
5,035,734 5,525,750 1,261,434 1,465,438
6,297,168 6,991,188
Massachusetts
9,738,816 9,907,323
20,000
20,000
635,624 9,758,816 10,562,947
Michigan __
17,868,723 18,132,506
444,206
580,983! 3,000,000 3,000,000 21,312,929 21,713,489
Minnesota
8,892,125 10,359,111 --
8,892,125 10,359, Ill
Mississippi__
6,960,133 6,703,490
215,993
214,085
7' 176,126 6,917,575
Missouri._
7,625,732 8,582,401
54,940
56,760
7,680,672 8,639,161
Montana __ _
2,788,433 2,928,379
13,584
13,500
2,802,017 2,941,879
Nebraska
7,791,979 9,052,922
7,500
7,500
7,799,479 9,060,422
Nevada ______________ _
652,301
675,012
New Hampshire _______ _ 1,700,289 1,874,608-- ..
566,763
652,3011 675,012 624,870 2,267,052 2,499,478
STATE HIGHWAY BOARD OF GEORGIA
DISTRIBUTION OF GAS TAX EXPENDITURES BY STATES-Cont'd.
For 1929 and 1930 Expended-For Constr.l
I
I
Maint. State and *Collection Costs-City State and County
Total
STATE
Local Roads
Streets, Schools, Miscel. Road Bond Payments
ll~:::.571:$ J_ _ 9~:::.104$ u~:::.231 New Jersey__ -- ---- -$ /:::.064$
1
1
1929
:::.040$ :::.660 __ ___
1930 _[$
New Mexico______ ____ 1,752,722 1,842,649
45,795
55,238$ 491,250$ 864,000 2,289,767 2,761,887
New York__________
18,085,522 27,004,976 1,001,870 1,471,314 _ _ ___ __ _____ _ __ _ 19,087,392 28,476,290
North Carolina___ ___ __ 7,702,647 8,845,ll3
9,000 ____________ 4,294,737 3,688,341 12,006,384 12,533,454
North Dakota______ _____ 1,776,102 1,935,000
25,000
36,986 ______________ .. _ ___
1,801,102 1,971,986
Ohio_____
______ 27,884,755 30,592,197 6,197,433
Oklahoma____ __
__ 10,841,609 12,029,736 __ ________ _
Oregon_____ ____ ____ 4,533,751 6,183,810
8,851
6,489,254 ____________ _
___ 34,082,188 37,081,451
62,684 __ _________ _ ___ ___ _ ___ 10,841,609 12,092,420
14,967 ____________ ____________ 4,542,602 6,198,777
ro Pennsylvania__
___ 32,278,804 29,894,789
145,825
278,875 3,333,187
g Rhode Island_____ _____ 1,160,271 1,301,810 __ _ _______ ____________
385,690
South Carolina___ ___ __ 6,871,076 4,666,708 ____________ ____
__ ___________
3,449,846 35,757,816 33,623,510 433,937 1,545,961 1,735,747
2,479,003 6,871,076 7,145,711
South Dakota___________ 2,585,894 2,715,155
114,455
12,750
845,416
775,977 3,545,765 3,503,882
Tennessee_______________ 6,656,318 8,532,479
46,454
53,596 2,588,081 2,133,120 9,290,853 10,719,195
Texas________ ____ _ _ 16,738,121 22,145,324 5,579,373 7,381,774 ____________ ____________ 22,317,494 29,527,098
Utah_____________________ 1,536,960 1,663,193
4,150
3,836
Vermont________ _ _____ 1,703,091 1,879,921 __ __ ______ ___ __ _____
438,500
438,500 1,979,610 2,105,529
________ ____ _______ 1,703,091 1,879,921
Virginia____________ _ ___ 9,894,941 10,775,058 ___ __ ____
_
___ __
__ _________
- ~f]fa~fi~~~~~--~ <~-~~
~j!gj~!
~:~~gJ~! ~:
09 605 -~ ~ [ :.496,573~ 549766 :
__
--2:6so,255
Wyoming____ ____ _______
1, 292, 233
1, 447, 005 __ .. ______ _ _ _ _ _ _ _ _ _
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
District of Columbia___ _ ____________ ____________ 1,428,181 1,599,689 _______ __ . ________ _
9,894,941
*:!~~:~!!
1, 292, 233
1,428,181
10,775,058
~:~~tgi~
1, 447, 005
1,599,689
TotaL ______________ $383,081,474$435,153,201 $ 25,179,1291$ 28,481,173!1$ 23,371,7851$ 31,049,036 $431,632,388l$494,683,410 1930 over 1929 ________________________ $ 52,071,727 ___________ -i1$ 3,302,044 _________ . __ $ 7, 677,251 ____________ $ 63,051,022
Note-CollectiOn Cost of Some States was denved from other sources, consequently not mcluded 1n Gas Tax Expenditures listed above. Miscellaneous items consist principally of distribution to schools, city streets, sea walls, etc.
STATE HIGHWAY BOARD OF GEORGIA. SUMMARY OF GALLONS OF GASOLINE TAXED AND DIS-
TRIBUTION OF GASOLINE TAX EXPENDITURES, FOR UNITED STATES-Years 1929 and 1930.
GTaol ltoanl sG__a_s_o_l_i_n_e__T_a__x_e_d____
1929 13,400,180,062
1930 14,751,308,978
Excess 1930 1,351,128,916
Distribution of Gas
1929
Expenditures
1930
Excess 1930
Constr. State & Local Roads$ Collection Cost, Streets,
pSocsheoso_l_s__a__n_d___O__t_h_e_r__P__u_r_-
State & County Roads Bond Payment __________________
383,081,474 $
25,179,129 23,371 '785
435,153,201$
28,481,173 31,049,036
Totals ________________ $ 431,632,388 $ 494,683,410$
52,071' 727
3,302,044 7,677,251 63,051,022
Percentage of Distribution
Constr. State & Local Roads $ Collection Costs, Streets,
Schools, etc. ______________ State and County Road
Bond Payments___________
1929
88.75 $ 5.83 5.42
1930
Increase or
Decrease
87.97
-.78
5.76
-.07
6.27
.85
251
STATE HIGHWAY BOARD OF GEORGIA. TOTAL NUMBER MOTOR VEHICLES REGISTERED AND LICENSE FEES F'OR U S., 1930
STATE
Number Autos, Trucks Registered Gross Receipts Auto License Fees
1929
1930
1929
1930
Alabama ______ . _ -----
Arizona_________ ---Arkansas ______
---
California_ --- --- --Colorado___ ----Connecticut _____
Delaware ------
Florida ___
-
GEORGIA _________
Idaho _________
--
I l l i n o i s _____
Indiana_ ---- --------
Iowa _____
----------
Kansas __ ---- ---- --
Kentucky -------
Louisiana ---- -Maine ___________
----
-----
Maryland ______ ----- -
Massachusetts __ -----
Michigan_
Minnesota
Mississippi
Missouri
Montana
Nebraska
--
Nevada_
-
I New Hampshire _
New Jersey
285,533 109,013
233,128 1,974,341
303,489
328,063 54,590 345,977
358,905 118,074 1,615,088 866,715 784,450
581,223 332,848
280,868 184,506
319,873 817,704 1,395,102
730,339 250,011
756,680 140,387 418,226
31,915 108,880 832,332
277,146 110,525 220,204 2,041,356
308,509 331,026 56,109 327,801 341,580
119,077 1,638,260
875,763
778,386 594,523 331,002
275,283 186,157 321,702
846,206 1,328,209
732,972 237,094 761,600 135,168
426,229
29,645
112' 183 852,850
$ 3,736,380.00 $ 3,799,761.00 $
748,565.00
734,626.00
4,212,161.00
4,283,959.00
10,489,068.00
9,858,810.00
1,835,386.00
1,901,230.00
7,992,755.00
8,290,404.00
1,023,440.00
1,110,047.00
4, 959,129.00
4,813,495.00
4,568,209.00
4,482,257.00
1,787,467.00
1,998,290.00
17,087,209.00
18,444,247.00
6,253,424.00
6,346,879.00
11,919,350.00
12,693,621.00
5,697,306.00
6,084,348.00
5,381,302.00
5,547,069.00
4,523,634.00
4,609,042.00
3,030,128.00
3,166,642.00
3,295,314.00
3,437,796.00
7,117' 725.00
7,120,583.00
23,212,316.00
22,482,412.00
10,846,826.00
11,062,150.00
2, 963,381_ 00
3,046,393.00
9,690,727.00
10,150,000.00
1,549,487.00
1,583,276.00
4,289,969.00
3,804,950.00
296,881.00
373,966.00
2,248,213.00
2,290,435.00
14,803,016.00
15,382,456.00
Average Receipts per Motor Vehicle
--
1929
1930
13.08
6.87 18.07
5.31 6.05 24.36 18.62 14.33
12.73 15.14 10.57
7.21 15.19
9.80 16.17 16.11
16.42 11.30
8.70 16.64 14.85
11.85 12.81 11.04
10.26 9.30
20.65 17.79
$ 13.71
6.65 19.45
4.83
6.16 25.04 19.78 14.68 13.12 16.78
11.26 7.25 16.31 10.23
16.76 16.74
17.01 10.69 8.41
16.92 15.09 12.85 13.33
11.71 8.93
12.61 20.41 18.03
STATE HIGHWAY BOARD OF GEORGIA. TOTAL NUMBER MOTOR VEHICLES REGISTERED AND LICENSE FEES FOR U. S., 1930.-Cont'd.
STATE
Number Autos, Trucks Registered Gross Receipts Auto License Fees
1929
1930
1929
1930
Average Receipts per Motor Vehicle
1929
1930
New Mexico_______ --New York _____ -----North Carolina _______
North Dakota__ Ohio __________
---- -
-------
Oklahoma.
Oregon_____ ----P e n n s y l v a n i a __
Rhode Island_ South Carolina --South Dakota
Tennessee -------Texas_________ .
Utah______
Vermont_ _____ -------
Virginia_____ --------
Washington_._ ------West Virginia_ ------Wisconsin______ .. ----Wyoming_______ -----District Columbia ...
78,374 2,263,259
483,602 188,046
1,766,614 570,791
269,007 1,733,283
134,009 231,274 204,199
362,431 1,348,107
112,661 93,030 387,205
442,341 268,888
793,502 60,680
(151 '880)
84,150 2,307,730
453,241
183,019 1,759,363
550,331
252,123 1,753,521
136,423
218,402 205,172 368,259 1,365,896 113,997
86,624 375,889
446,062 266,273
782,562 61,501
(156,676)
$ 756,763.00 $ 38,293,313.00
7' 045,116.00 1,989,475.00 12,860,453.00 6,964,360.00 7,644,226.00 29,264,695.00 2,403,809.00 2,674,379.00 3,150,657.00 4,288,420.00 20,418,696.00
838,300.00 2,339,782.00 6,145,296.00 7,547,382.00 4,565,836.00 11,780,703.00
647,200.00
------------ ---
1,279,623.00 40,857,715.00
6,835,743.00 1,958,662.00
13,287,352.00 6,536,361.00
9,617,930.00 33,112,371.00 2,280,849.00
2,878,352.00 2,959,913.00 4,767,239.00 13,961,362.00
855,584.00
2,392,152.00 6,493,989.00
7,616,676.00 4,702,812.00 13,083,521.00
691,509.00
(636' 001. 00)
$ 9.66 $ 16.92 14.57 10.58 7.28 12.20 28.42 16.88 17.94 11.56 15.43 11.83 15.15 7.44 25.15 15.87 17.06 16.98 14.84 10.67
---- ----------
15.21 17.70 15.08
10.70 7.55 11.88
38.15 18.88 16.72 13.18
14.43 12.95 10.22 7.51
27.61 17.28 17.07 17.66
16.72
11.24 4.06
Sub-totals _ --Deduct D. C. . --
26,501,443 151,880
26,523,779 156,676
$ 355,704,860.00 636,001.00
Totals _______ --Increase 1930__________
26,349,563
26,367,103 17,540
Note-District of Columbia not included ln totals.
347,177,629.00 $ 355,068,859.00 7,891,230.00
INDEX
STATE HIGHWAY BOARD OF GEORGIA
INDEX TO THIRTEENTH REPORT-FISCAL YEAR ENDING JUNE 30, 1931.
Page A
Accidents Reported-Comment__________________ ________________ 227
Accidents Reported-Table_______________________________________ 228
Accounting-Comment___________________________ _______________ 27
Accounting-Exhibit A-Assets and Liabilities___________________ 30
Accounting-Exhibit B-Reconciliation of Fund Deficit, Reflect-
ing Fund Revenue, Appropriations and Allotments_______________________________ ________ ____ _ 32
Accounting-Exhibit C-Revenue Receipts and Expense Disburse-
ments______________________________
34
Accounting-Chart of Highway Dollar Percentages_______________ 36
Accounting-Exhibit D-Summary of Construction______________ 37
Accounting-Schedule l-Bank Balances________________________ 38
Accounting-Schedule 4-Land, Buildings and Equipment_______ 39
Accounting-Schedule 7-Summary of Allotments, Appropria-
tions, Fund Balances; Also, Reflecting Reconciliation with Expense Disbursements________________ 42
Accounting-Schedule 7A-Detail of Construction. Unencumbered Allotments_ _______________ ________________ 44
Accounting-Schedule 7B-Detail of Maintenance. Unencum-
bered Allotments by Units and Congressional Districts_____________________________________________ 46
Accounting-Schedule 7C-Detail of Administration. Unencumbered Allotments by Units________________________ 50
Accounting-Schedule 7D-Detail of Equipment. Unencumbered Allotments_ ____________________ _________________ 51
Accounting-Schedule 7E-Maintenance Appropriation__________ 52
Accounting-Schedule 7F-Administration Appropriation_____
53
Accounting-Schedule 7G-Equipment Appropriation___________ 54
Accounting-Schedule 8-Summary of Estimated Participation;
Also, Reflecting Reconciliation with Revenue
Receipts________________ __________________
56
Accounting-Schedule 9-Summary of Actual Construction by
Congressional Districts; Also, Comparisons with
the Allotments Distributed on Mileage Basis______ 58
Accounting-Schedule 10-Summary of Actual Allotments by
Congressional Districts; Also, Comparison with the Allotments Distributed on Mileage Basis__________ 60
Accounting-Schedule ll-Summary of Expense Disbursements by Object of Expenditure_____ ___________________ 64
254
INDEX-Continued.
Page
Accounting-Schedule llA-Analysis of Expense Disbursements by Object of Expenditure_________________________ 65
Accounting-Schedule HE-Analysis of Construction Expense Disbursements by Object of Expenditure__ __ ____ 66
Accounting-Schedule 110-Analysis of Maintenance Disbursements by Object of Expenditure_____ ____________ 67
Accounting-Schedule llD-Analysis of Equipment Expense Disbursements by Object of Expenditure_________ 68
Accounting-Schedule 12-Summary of Expense Disbursements by Congressional Districts________________________ 70
Accounting-Schedule 13-Summary of Expense Disbursements by Division Units__________________ _____________ 71
Accounting-Schedule 13A-Analysis of Administration Expense Disbursements by Units__________________________ 72
Accounting-Schedule l3E-Analysis of Actual Construction
Disbursements by Congressional Districts and Division Units________________________ ________ ___ 74
Accounting-Schedule 130-Analysis of Survey Expense Dis-
bursements by Congressional Districts and Divi-
sion Units__________
__________ 78
Accounting-Schedule 13D-Analysis of Maintenance Expense
Disbursements by Congressional Districts and Division Units _______________________ .___ ______ __ 81
Accounting-Schedule 13E-Analysis of Emergency Expense Dis-
bursements by Congressional Districts and Divi-
sion Units__________ _______________________
84
Accounting-Schedule 14~-Analysis of Expense Disbursements
by Object of Expenditure Classification___________ 88 Administration-Accounting, Schedule 70_______________________ 50
Administration-Accounting, Schedule 7F ________ ...... _________ 53 Administration-Accounting, Schedule llA______________________ 65
Administration-Accounting, Schedule 13A __ .. __ . __ .... _. ___ . __ 72
Analysis of Administration Disbursements-Accounting-Schedule llA _____ . _. __ . _______________________ . ____ ..... ____ . __ .. __ 65
Analysis of Administration Expense Disbursements-AccountingSchedule 13A ____ _______ . _. _ _____________ __. __ . _____ . __ . __ 72
Analysis of Construction Expense Disbursements-AccountingSchedule llE________________________________ __________________ 66
Analysis of Actual Construction Disbursements by Congressional
Districts and Division Units-Accounting-Schedule 13E ______ 74
Analysis of Emergency Expense Disbursements by Congressional
Districts and Division Units-Accounting-Schedule 13E_______ 84
Analysis of Equipment Expense Disbursements by Object of Expenditure-Accounting-Schedule llD ___________________ . _____ 68
Analysis of Expense Disbursements by Object of Expenditure Classification-Accounting-Schedule 14_____ ___ _____ __________ 88
Analysis of Maintenance Disbursements by Object of Expenditure-Accounting-Schedule llO _______ . ____ _____ _____________ 67
255
INDEX- -Continued.
Page
Analysis of Maintenance Expense Disbursements by Congres-
sional Districts and Division Units-Accounting--Schedule 13D 81
Apportionment of Federal Aid Funds to Each State___
242
Apportionment of Federal Aid Funds to lO S. E. States_
245
Assets and Liabilities-Accounting-Exhibit A_
30
Asphalt Department- Comment
173
Asphalt Department-Projects Completed _
175
Asphalt Department-Projects Under Construction__
175
Automobiles __
216
B
Bank Balances- Accounting-Schedule 1 __ Beautification, Highway _________ _ Blue Prints ______________________ _ Board Members and Officials of the Department __ Bridge Construction-Comment_ __ _ Bridge Construction-Bridge Structures Completed_
38 225 111
16 161 __166-170
c
Chart of Highway Dollar____________ Chart, Organization______________________
36
_________
15
Consolidated Table of Types and Miles of Road Completed____
160
Consolidated Table of Types and Miles of Road Placed Under
Construction___________________________ ____________________ __ 140
Construction-Detail of Unencumbered Allotments- Accounting
-Schedule 7A________________________
_ _______ ______ 44
Construction- Summary of Actual Construction by Congres-
sional Districts-Accounting-Schedule 9_ __ ___ ____________
58
Construction-Analysis of Expense Disbursements by Object of Expenditure-Accounting-Schedule llB_____ ____ ______ _____ 66
Construction-Analysis of Actual Disbursements by Congres-
sional Districts and Division Units-Accounting-Schedule 13B 74
Construction-Analysis of Survey Expense Distributed by Con-
gressional Districts and Division Units--Accounting-Schedule
13C __________________________________ ----------------
78
Construction-Asphalt Department-Projects Completed________ 175
Construction-Asphalt Department-Projects Under Construction_______ _____________________ __________ _________________ 175
Construction-Bridge Department-Comment_ ________ ___ _____ 161
Construction-Bridge Department-Bridges Completed_______
166
Construction-Bridge Department-Recapitulation_______________ 170
Construction-Comment_____________________________________
99
Construction-Consolidated Table of Types and Miles Placed
Under Construction____ _______________ ____________
140
Construction-Consolidated Report of Mileage Constructed_
160
256
INDEX-Continued.
Page
Construction-Convict Department-Projects Under Construe-
tion ____________ .__________ _
178
Construction-Engineering Divisions
103
Construction-Federal Aid Apportioned to Georgia __
189
Construction--Laboratory Comment __ . __ _
183
Construction- Laboratory Report __
187
Construction-Projects Completed and
Settlement Closed
__ 144-146-148-150-152-154-156
Construction- -Projects Placed Under Construction 116-121-125-129-135
Construction-Purchasing Department_ __
180
Construction--Research Department___
184
Construction-State Forces--Asphalt Department-Comment_
173
Construction-Summary of Completed Projects and Types and
Miles Constructed___________
158
Construction-Summary of Projects Placed Under Construction 140
Construction-Surveys __
111
Contents___ _________________ _
3
Counties Comprising Engineering Divisions
103
D
Detail of Administration Unencumbered Allotments by Units--
Accounting-Schedule 7C_________ ___
50
Detail of Construction Unencumbered Allotment-Accounting-
Schedule 7A_ ______ _______________________
__________ 44
Detail of Equipment Unencumbered Allotment-Accounting-
Schedule 7D _ __________________ _________ ______
51
Detail of Maintenance Unencumbered Allotments by Units and
Congressional Districts-Accounting 7B__ _ _____________
46
Distribution of Gas Tax Expenditures by Each State in the United
States__
249
Distribution of Gas Tax Fund of One Cent per Gallon to Counties
in Georgia
235
E
East Point Shop-Comment ______ .
222
Emergency Expense Disbursements by Congressional Districts
and Division Units-Accounting-Schedule l3E_
84
Employees in Ten S. E. State Highway Systems________ __ ______ 246
Engineering Divisions_____ ___________ _______________
103
Equipment-Detail of Unencumbered Allotments by Units-Ac-
counting-Schedule 7D________
51
Equipment-Appropriation-Accounting--Schedule 7G _ ____
54
Equipment--Analysis of Expense Disbursements by Object of
Expenditure-Accounting--Schedule llD_ _____ _ _________
68
Equipment-Automobiles_______ ___________
216
257
INDEX-Continued.
Page
Equipment-Comment__ _ ________________ .. ________ . ____________ 215
Equipment-Land and Buildings-Accounting-Schedule 4_ ____ 39
Equipment-Other Road__ __
__________ _________
219
Equipment-Summary of_______
____________
221
Equipment-Tractors ___ .___
______ ____
218
Equipment-Trucks________
___________
217
F
Federal Aid Apportioned to Each State____________ .. ___ _________ 242
Federal Aid Apportioned to Georgia_________________
189
Federal Aid Apportioned to Ten S. E. States._________
245
Federal Aid and Emergency Construction, 10 S. E. States___
243
Foreword. ________ . ____________ . ________ ... _.. ____ ...
7
Frontispiece___ . ___ _
2
G
Gallons of Gasoline Taxed by States in United States_
247
Gas Tank Expenditures, Distribution of in U.S...... _
249
H
Highway Beautification _________________ _
225
Highway Dollar, Chart of. _____________________ _
36
Highway Magazine _______ . _______ ... __ _
233
Highway Map______ _____ .... _______ ...... _
261
History of Highway Development in Georgia __
8
I
Index ____ _
254
Introductory-Part One_
5
L
Laboratory Comment __ _
183
Laboratory Report___
187
Land, Buildings and Equipment--Accounting-Schedule 4 _
39
Letter of Transmittal-State Highway Board to Governor_____
17
Letter of Transmittal-State Highway Engineer to State HighwaY
Board
__________________________________ _________ 19
Letter of Transmittal-Treasurer to State Highway Board.
19
List of Georgia Counties showing Engineering Division, Con-
gressional Districts, Commissioners Districts, State Mileage_
21
Looking Backward_ ___ __ _____________ ___________________
6
258
INDEX-Continued. M
Page
Maintenance Appropriation-Accounting-Schedule 7E ___ _
52
Maintenance Comment _____ .. _________ ______________________ _
193
Maintenance Disbursements--Accounting-Schedule 11C
67
Maintenance Expense Disbursements by Congressional Districts
and Division Units--Accounting-Schedule 13D _________ . _____ _ 81
Maintenance-Part Four __
191
Maintenance Sections, Personnel and Mileage ___________ 196-200-206-213
Maintenance Unencumbered, Detail of Accounting-Schedule 7B 46
Map--Back of Report_______
261
Maps and Road Information________
229
Magazine-"GEORGIA HIGHWAYS"__
233
Mileage-State System________
21
Miscellaneous-Part Five _
231
Motor Vehicles Registered and License Fees__
252
0
Officials and Personnel of State Highway Board___ _
16
Organization Chart ____ _
15
Other Road Equipment_
219
p
Personnel of Maintenance Sections___ _
_____ 196-200-206
Personnel of State Highway Board___
16
Plans . ___________ .. __________
111
Projects Completed-Asphalt Department________
175
Projects Under Construction-Asphalt Department_ . _
175
Projects Completed-Bridges______________
166
Projects Completed-Bridges Recapitulation __
170
Projects Under Construction-Convict Department___
178
Projects Completed and Settlement Closed ________________________________ 142-144-146-148-150-152-l54-156
Projects Placed Under Construction_____________ ll3-116-121-125-129-135
Purchases__ __ __
___________ _________________ . _____ 180
R
Railroad Claims _______ _
232
Reconciliation of Fund Deficit, Reflecting Fund Revenue, Ap-
propriation and Allotment, Accounting-Exhibit B_____________ 32
Registration and License Fees, Each State_______________________ 252
Research Comment---------------------------------------------- 184
Revenue Receipts and Expense Disbursements-Accounting-
Exhibit C ______________
____________________________ 34
Road Information and Maps .. _______________________ ------- __ ----~ 229
Road and Bridge Contracts, TenS. E. States_____________________ 245
259
INDEX-Continued.
Page
s
Signs-Comment_________________________________________________ 223 Signs-'rableof__________________________________________________ 224 State Forces-Asphalt Department ______________________________ 173-175 State Forces-Comment__________________________________________ 173 State Forces-Convict Department_______________________________ 178 State Highway Beautification____________________________________ 225 State Highway Board-Letter of 'rransmittaL ______ _______ __ _____ 17 State Highway Board-Officials and PersonneL__________________ 16 State Highway Engineer-Letter of 'rransmittaL_________________ 19 State Highway Mileage___________________________________________ 21 State Highway 'rreasurer-Letter of 'rransmittaL ______ _____ _____ 19 Summary of Allotments, Appropriation, Fund Balances-Account-
ing-Schedule 7_ ____ _________ ___ __ ___ ___ __ ______ _______ _____ __ 42
Summary of Actual Allotments by Congressional Districts; Also, Comparison on Mileage Basis-Accounting-Schedule 10_ ______ 60
Summary of Actual Construction by Congressional Districts; Also, Comparison with Allotments on Mileage Basis-Accounting-Schedule 9________________________________________________ 58
Summary of Construction-Accounting-Schedule D ____________ 37 Summary of Equipment__________________________________________ 221
Summary of Estimated Participation; Also, Reflecting Reconciliation with Revenue Receipts-Accounting-Schedule 8_ ____ 56
Summary of Expense Disbursements by Congressional DistrictsAccounting-Schedule 12_ _______ ___ _____ ___ ___ __ ____ ______ ___ 70
Summary of Expense Disbursements by Division Units, Accounting-Schedule 13 ________________ ______________________________ 7l
Summary of Expense Disbursements by Object of ExpenditureAccounting-Schedule 1L _____________________________________ 64
Summary of Maintenance Sections_______________________________ 213 Summary of Projects Completed__________________________________ 158 Summary of Projects Placed Under Construction_________________ 140 Surveys-Comment_____________________________________ ____ _____ 111
T
'rag License Fees, Vehicles Registered, Each State________________ 252 'ritle Page _______________________________________________________ _ 'rractors, 'fable oL _____ __ __ ___ __ ___ __ ___ ___ ___ ___________ ____ ____ 218 'rrafficAccidents________________________________________________ 227 'rreasurer-Letter of 'rransmittaL ________________________________ 19 'rrucks-'fable of__ ______________________________________________ 217
w
Warehouse ______________ _
232
260