Statewide Transportation Improvement Program, fiscal years 1997,1998,1999 [1997]

rt GA

~
t.,

T lOG

c,:;; I

f TT6
l :r;cq_cn STATEWIDE

F~

~ TRANSPORTATION

~ IMPROVEMENTPROGRAM

GEORGIA DEPARTMENT OF TRANSPORTATION

FISCAL YEARS
1997 1998 1999

TABLE OF CONTENTS

:.._ -'
INTRODUCTION REGIONAL DEVELOPMENT CENTERS GRAPH
ATLANTA REGIONAL COMMISSION CENTRAL SAVANNAH RDC CHATTAHOOCHEE FLINT RDC COASTAL GEORGIA RDC COOSA VALLEY RDC GEORGIA MOUNTAINS RDC HEART OF GEORGIA - ALTAMAHA RDC LOWER CHATTAHOOCHEE RDC LUMP SUM AREA MCINTOSH TRAIL AREA RDC MIDDLE FLINT AREA RDC MIDDLE GEORGIA RDC NORTH GEORGIA RDC NORTHEAST GEORGIA RDC SOUTH GEORGIA RDC SOUTHEAST GEORGIA RDC SOUTHWEST GEORGIA RDC INDEX

PAGE
1 45 61 67 86 104 117 131 142 160 165 170 184 190 204 213 221

INTRODUCTION
The Georgia Department of Transportation's Statewide Transportation Improvement Program (STIP) is a three-year document that contains Federal Aid projects programmed for Fiscal years 1997, 1998 and 1999. These projects have been identified and developed through a cooperative planning process between the Department of Transportation, city and county governments and concerned citizens.
The STIP includes Highway and Bridge, Bicycle, Pedestrian, Transportation Enhancement and Public Transportation (transit) projects. Project cost for related activities, such as Preliminary Engineering (PE), Right ofWay (ROW) and Construction (CONST) are given for highways, and CAPITAL and OPERATING cost for public transit. The projects are organized in alphabetical order by Regional Development Center, County and mode of transportation.
Federal law requires a Transportation Improvement Program (TIP) for each metropolitan area exceeding 50,000 population. These TIP's are developed by Metropolitan Planning Organizations (MPO's) designated by the governor. The projects developed by the MPO's are included in the STIP.
The Intennodal Surface Transportation Efficiency Act of 1991 (ISTEA) specifies development of the STIP and that it be made available for public review and comment. Comments from citizens were solicited by public notice in the various legal organs throughout the state from May through August of this year, and at public information meetings held at each of the Regional Development Centers and each MPO.
The STIP is fiscally balanced, including only those projects with funding available or with a reasonable expectation of obtaining funds.
Projects in the Statewide Transportation Improvement Program emphasize maintenance, safety and improving operations of the existing highways, bridges and public transportation. The Georgia Department of Transportation is pleased to make this document available. We welcome comments on the STIP. Please send any questions or comments to:
Georgia Department of Transportation Office of Planning No. 2 Capitol Square Atlanta, Georgia 30334
Att: Carl Spinks (404) 657-6688 spinks_c@dot.state.ga.us

STIP FUNDS BY MODE
Fiscal Year 1997-98-99 ($ 2.471 Billion)

Public Trans. $519
(Including MARTA}

New Cst. $302

Maintenance $268 ridge $183

TEA $41

f-~~fotu $89

Dollars Shown in Millions

Recst/Rehab $1069

Georgia's Regional Development Centers

1. Coosa Valley 2. North Georgia 3. Georgia Mountains 4. Atlanta Region 5. Chattahoochee-Flint 6. Mcintosh Trail 7. Northeast Georgia 8. Middle Georgia 9. Central Savannah
River Area 10. Lower Chattahoochee 11. Middle Flint 12. Heart of Georgia -
Altamaha 13. Coastal Georgia 14. Southwest Georgia 15. South Georgia 16. Southeast Georgia

L .
ATLANTA REGIONAL COMMISSION
Cherokee Clayton
Cobb Dekalb Douglas Fayette Fulton Gwinnett Henry Rockdale

70
Ric!c_ ________ _
llLLLQJi_
c_c.c<~~~~f~;:~~]

10

II

0
M

10

t..__::_ __ :'J-0

1.,- c-;_

\._(_

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 1

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

ATLANTA TIP # CH AR 152B

6V7006 TRANSIT PROJECTS / CAPITAL

CONG DIST. 9 & 6

FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY

CAPITAL 1997

$

30

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

24

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6V7016 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY MANAGER: STEVE KISH STATUS:

ATLANTA TIP # CH AR 152C

CONG DIST. 6 & 9

CAPITAL 1998

$

31

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

CHEROKEE I-75 @ SR 92 610740 INTERCHANGE / RECST. OR REHAB.
LENGTH(Miles/km): .45/.72405- EXIST. LANES: 4 /PROPOSED LANES: MANAGER: RAY METTS STATUS: CHEROKEE SGN A 2/96;COBB SGN DO U 5/96;BARTOW REF A 4/96.

ATLANTA TIP # CH AR 108 CONG DIST. 6 6 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1997 $ 2580

CONST 1998

$ 2892

FED SHARE $ 2314

GA. SHARE $ 578

OTH SHARE $

CHEROKEE I-575 @ CR 416 & GUARDRAIL POSTS

ATLANTA TIP # CH AR 223

611145 TURN LANES / SAFETY

CONG DIST. 6

LENGTH(Miles/km): 12.35/19.87115 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: GREG PARKER

FUND SOURCE: I-STATE MAINT.

STATUS: COUNTY SGN FOR ROW & UTILITIES 1-31-95

OTO

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY ROW LOCL CONST 1997 $ 1142
FED SHARE $ 1142 GA. SHARE $ OTH SHARE $

CHEROKEE SR 92 FM WADE GREEN ROAD TO CHEROKEE TRAIL 620920 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.62/4.21558 MANAGER: RAY METTS STATUS: CHEROKEE COUNTY SGN FOR UTILITIES 11-4-91.

ATLANTA TIP # CH 003 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW 1998 CONST

UNDERWAY $ 7631 AFTER 99

CHEROKEE SR 92 FM I-75 TO WADE GREEN ROAD 620940 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 5.40/8.68860 MANAGER: RAY METTS STATUS: CHEROKEE COUNTY SIGNED FOR UTILITIES 11-4-91.

ATLANTA TIP # CH 004 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1995
ROW 1998 CONST

UNDERWAY $ 6450 AFTER 99

CHEROKEE SR 92 FM CHEROKEE TRAIL TO CANTON HWY/SR 754 621390 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): 1.80/2.89620 MANAGER: KEVIN HOSEY STATUS: CO SGN 1/90 PUB UTL/WOODSTOCK SGN 12/90 UTIL. SEE #620920

ATLANTA TIP # CH 009 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1992 UNDERWAY
ROW 1997 $ 6694 CONST 1998 $ 7481
FED SHARE $ 5985 GA. SHARE $ 1496 OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 2

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------P-R-O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-OM--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHEROKEE CANTON HWY FM PALM RD/CR 351 TO N/SIXES RD [INCL RR BR]

ATLANTA TIP # CH 002A

PE 1994 UNDERWAY

630673 REPLACEMENT OF THE EXISTING BRIDGES{S). FROM 2 TO 3 LANES.

CONG DIST. 6

ROW LOCL

LENGTH{Miles/km): .28/.45052

CONST 1997

$

800

MANAGER: GREG PARKER

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 640

STATUS: CHEROKEE COUNTY SIGNED 9-23-91 FOR ROW AND UTILITIES.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

160

63Y673 IS AN ASSOCIATED PROJECT.

OTH SHARE $

CHEROKEE CR 770/BELLS FERRY FM 700 FT S. OF LITTLE RIVER BRD N. . 2 MI 630975 REHABILITATION OF THE EXISTING BRIDGE{S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: B. FERGUSON STATUS: CHEROKEE COUNTY SIGNED 9-23-91 FOR ROW & UTIL. {SEE 630977)

ATLANTA TIP # CH 018 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1997

$

913

FED SHARE $ 730

GA. SHARE $

183

OTH SHARE $

CHEROKEE SR 20 AT HOLBROOK CAMPGROUND ROAD/CR 763
632640 TURN LANES / SAFETY LENGTH{Miles/km): .42/.67578- EXIST. LANES:
MANAGER: GREG PARKER STATUS: COUNTY SIGNED FOR ROW AND UTILITIES 3-19-96

0 /PROPOSED LANES: OTO

ATLANTA TIP # AR 157C
CONG DIST. 9 0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

257

FED SHARE $ 231

GA. SHARE $

26

OTH SHARE $

CHEROKEE SR 20 AT EAST CHEROKEE DRIVE/CR 765/CR 782 632650 TURN LANES / SAFETY
LENGTH(Miles/km): .42/.67578- EXIST. LANES: MANAGER: GREG PARKER STATUS: COUNTY SIGNED FOR ROW AND UTILITIES 3-19-96

0 /PROPOSED LANES: OTO

ATLANTA TIP # AR 157C CONG DIST. 9 0 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

255

FED SHARE $ 230

GA. SHARE $

26

OTH SHARE $

CHEROKEE CANTON HWY FM PALM RD TO SIXES RD - FOR STP; SEE 630673 63Y673 BRIDGES / REPLACEMENT
LENGTH{Miles/km): .00/.00000 MANAGER: GREG PARKER
STATUS: SEE 630673

ATLANTA TIP # CH 002B CONG DIST. 9

PE NONE $

0

ROW LOCL

CONST 1997 $ 351

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 281

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

70

630673 IS AN ASSOCIATED PROJECT.

OTH SHARE $

CHEROKEE CR 362/MILL CREEK ROAD @ MILL CREEK 2 MI NE OF WOODSTOCK 670950 REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES.
LENGTH{Miles/km): .20/.32180 MANAGER: GREG PARKER STATUS: REQ CHEROKEE COUNTY DO ROW, UTILITIES & DETOURS 9-27-94

ATLANTA TIP # CH 028 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW LOCL

CONST 19.98

$

838

FED SHARE $ 670

GA. SHARE $ 168

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 3

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLAYTON CAPITAL - PARK & RIDE LOTS - SR 85 AT POINTE SOUTH PARKWAY,

ATLANTA TIP # CL AR 220D

7D7543 TRANSIT PROJECTS / CAPITAL

CONG DIST. 3

FUNDS RECIPIENT: CLAYTON COUNTY MANAGER: STEVE KISH STATUS: US 41/19 AT LOVEJOY RD, SR 314 AT SR 138, FEASIBILITY STUDY

FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$

FED SHARE $

GA. SHARE $

1353 1082
135

OTH SHARE $

135

CLAYTON 7V7008
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH

ATLANTA TIP # CL AR 223B

CONG DIST. 3

CAPITAL 1997

$

30

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

CLAYTON 7V7023
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH

ATLANTA TIP # CL AR 223C

CONG DIST. 3

CAPITAL 1998

$

31

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

CLAYTON 712602
STATUS:

LEE STREET IN MORROW OVER I-75 BRIDGES / NEW CONSTRUCTION LENGTH(Miles/km): .08/.12872
MANAGER: M. REYNOLDS COUNTY SGN DO ROW, UTIL, CONST ROADWAY & APPROACHES 2-15-94

ATLANTA TIP # CL 059 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 712630 IS AN ASSOCIATED PROJECT.

PE 1992

UNDERWAY

ROW LOCL

CONST 1998 $ 1079

FED SHARE $

863

GA. SHARE $

216

OTH SHARE $

CLAYTON 712630
STATUS:

I-75 FM MT ZION RD TO OLD DIXIE(BRIDGES)& SR 54 INTERCHANGE

ATLANTA TIP # CL AR 031

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 3

LENGTH(Miles/km): 2.40/3.86160 - EXIST. LANES: 4 /PROPOSED LANES: 6

MANAGER: M. REYNOLDS

FUND SOURCE: NAT'L HIGHWAY

DOT TO PAY 9-2-92

FEDERAL HIGHWAY ADMIN FUNDS

751295 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1997

$

920

CONST 1998 $ 15139

FED SHARE $ 12111

GA. SHARE $ 3028

OTH SHARE $

CLAYTON 713050
STATUS:

I-675, I-75, I-20: IMPACT ATTENUATORS IMPACT ATTENTUATORS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST.
MANAGER: KARL ALFF NOT APPLICABLE

& BARRIER WALL AT BR LANES: 0 /PROPOSED LANES:

ATLANTA TIP # AR 222 CONG DIST. 3 & 5 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1997 $ 1000

FED SHARE $ 1000

GA. SHARE $

OTH SHARE $

CLAYTON 713070
STATUS:

I-75, I-85, I-20, I-285 & I-675 @ VARIOUS LOC IN METRO ATL

ATLANTA TIP # AR 187

GUARDRAIL / MAINTENANCE

CONG DIST. 5

LENGTH(Miles/km): 34.00/54.70600- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE

$

0

ROW NONE

$

0

CONST 1997

$

523

FED SHARE $ 523

GA. SHARE $

OTH SHARE $

COUNTY P. I . NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

CLAYTON 713210
STATUS:

I-285 EAST TO I-75 SOUTH RAMP ALIGNMENT

ATLANTA TIP # CL AR 179

RAMP / RECST. OR REHAB.

CONG DIST. 3

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: D. SMITH

FUND SOURCE: I-STATE MAINT.

REQ CLAYTON COUNTY DO UTILITIES 10-31-95

FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 721040
STATUS:

SR 54 (& FAYETTE CO) @ MORNING & CAMP CRKS; & FLINT RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): 1.20/1.93080 MANAGER: D. GODWIN CLAYTON SGN 6/85 FOR UTILITIES;FAYETTE SGN 5/95 UTILITIES

ATLANTA TIP # CL 023 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72104X IS AN ASSOCIATED PROJECT.

CLAYTON 72144X
STATUS:

SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 ... SEE FAYETTE CO.

ATLANTA TIP# CL 041

UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: M. REYNOLDS

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

721440 IS AN ASSOCIATED PROJECT.

CLAYTON 721480
STATUS:

SR 138 FM WALT STEPHENS RD EAST TO I-75/HENRY CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.55/5.71195
MANAGER: J. GARLAND REQ CLAYTON & HENRY COUNTIES DO UTILITIES 6-7-90.

ATLANTA TIP # CL 031 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 72148X IS AN ASSOCIATED PROJECT.

CLAYTON 731520
STATUS:

SR 3/US 19 @ CEN OF GA RAILROAD .35 MI S OF JCT I-285 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .26/.41834 MANAGER: D. GODWIN REQ CO DO UTIL 2-9-96 1 REQ FOREST PARK DO UTIL 2-9-96.

ATLANTA TIP # CL 095 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 4

FISCAL YEAR

COST ESTS

PE 1995 UNDERWAY

ROW 1997

$

50

CONST 19-98

$

388

FED SHARE $ 349

GA. SHARE $

39

OTH SHARE $

PE 1986 UNDERWAY ROW 1994 UNDERWAY CONST 1997 $ 4555
FED SHARE $ 3644
GA. SHARE $ 911
OTH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

PE 1992 ROW 1997 CONST

UNDERWAY
$ 4970 AFTER 99

PE 1997 ROW 1998 CONST

UNDERWAY $ 110 AFTER 99

CLAYTON "751770
STATUS:

BATTLECREEK-MT.ZION FM SOUTHLAKE PKWY TO LAKE HARBIN RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.63/4.23167 MANAGER: J. GRAYBEAL CLAYTON COUNTY SIGNED 3-5-91 FOR ROW AND UTILITIES.

ATLANTA TIP # CL 019 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

10

AFTER 99

CLAYTON 751775
STATUS:

BATTLE CREEK RD FM VALLEY HILL RD TO SOUTHLAKE PKWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.98/3.18582 MANAGER: D. GODWIN CLAYTON COUNTY SIGNED 6-4-91 FOR ROW & UTILITIES

ATLANTA TIP # CL 017A CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

10

AFTER 99

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

t:._._

.,_)

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 5

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLAYTON BETHSAIDA RD EXT FM SR 85 TO CHURCH ST & CTR TN LN ON CHURCH

ATLANTA TIP # CL 052A

PE 1997 UNDERWAY

752590 RECONSTRUCTION & WIDENING FROM 3 LANES TO 5 LANES.

CONG DIST. 5

ROW LOCL

LENGTH(Miles/km): 1.07/1.72163

CONST 1998

$ 1438

MANAGER: D. SMITH STATUS: COUNTY SGN CT FOR PE, ROW & UTILITIES 8-25-95

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 1150 GA. SHARE $ 288

OTH SHARE $

CLAYTON 752600
STATUS:

BETHSAIDA RD EXT FM ROBERTS DR TO UPPER R'DALE RD ON N LOC CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 1.15/1.85035 MANAGER: D. SMITH CT REQ COUNTY DO PE, ROW & UTILITIES 4-12-95

ATLANTA TIP # CL 052C CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 770460
STATUS:

JESTERS CK GREENWAY FM JONESBORO TO MORROW

ATLANTA TIP # CL 089

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 3

LENGTH(Miles/km): 4.00/6.43600 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. CRANFORD

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1997

$

ROW LOCL

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

25 2679
2679

PE 1995 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$ 1364

FED SHARE $ 1017

GA. SHARE $

OTH SHARE $ 347

CLAYTON 770972
STATUS:

BICYCLE RACKS FOR CLAYTON COUNTY

ATLANTA TIP # CL AR 177A

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 3 & 5

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997 $

13

FED SHARE $

10

GA. SHARE $

OTH SHARE $

3

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 6

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

TRANSIT OPERATING ASSISTANCE FOR FY 1997

ATLANTA TIP # CO AR 221B

707513 TRANSIT PROJECTS / OPERATIONS

CONG DIST. 6 & 7

FUNDS RECIPIENT: COBB COMMUNITY TRANSIT

OPERATING 1997

$ 4239

~AGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT

FED SHARE $ 270

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $ 3969

COBB 707514
STATUS:

CAPITAL/PLANNING - MULTI-USE TRANSIT FACILITY, VEHICLE TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH WHEELCHAIR LIFTS REPLACEMENT - 12, FACILITY IMPROVEMENTS.

ATLANTA TIP # CO AR 222B CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

2596 2077
260 260

COBB 707532
STATUS:

TRANSIT OPERATING ASSISTANCE FOR FY 1998 TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: MANAGER: STEVE KISH

ATLANTA TIP # CO AR 221C CONG DIST. 7 & 6
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

4186 244
3942

COBB 707533
STATUS:

CAPITAL/PLANNING - MULTI-USE TRANSIT FACILITY, VEHICLE TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

ATLANTA TIP # CO AR 222C CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

2596 2077
260
260

COBB 7V7009
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY
MANAGER: STEVE KISH

ATLANTA TIP # CO AR 231B

CONG DIST. 7 & 6

CAPITAL 1997

$

75

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

60

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

8

OTH SHARE $

8

COBB 7V7024
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH

ATLANTA TIP # CO AR 231C

CONG DIST. 7 & 6

CAPITAL 1998

$

78

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

62

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

8

OTH SHARE $

8

COBB 712752
STATUS:

WINDY RIDGE PARKWAY FM COBB PKWY TO THE I-75 BRIDGE; PHASE 2 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
LENGTH(Miles/km): .70/1.12630 MANAGER: G. ROSS COBB SGN 3-26-93 UTIL/PE/ROW EXECPT FROM US 41 TO CIRCLE 75

ATLANTA TIP # CO 171B CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 770931 IS AN ASSOCIATED PROJECT.

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$ 1844

FED SHARE $ 1475

GA.- SHARE $ 369

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 7

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

KENNEDY INTERCHANGE I-75NB TO I-285WB FLYOVER BRIDGE (CT 5)

ATLANTA TIP # CO AR 078M

PE 1998 $

5

712806 INTERCHANGE / NEW CONSTRUCTION

CONG DIST. 6

ROW LOCL

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 2

CONST

AFTER 99

MANAGER: G. ROSS

FUND SOURCE: I-STATE MAINT.

STATUS: COBB SGN DO ROW, UTIL & PE 3-26-93.

FEDERAL HIGHWAY ADMIN FUNDS

COBB 713240
STATUS:

I-285 @ WEST PACES FERRY RD - INTERCHANGE RECST INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .50/.80450 -EXIST. LANES: 4 /PROPOSED
MANAGER: G. ROSS COBB SGN CONTRACT FOR PE & UTILITIES 9-28-95

LANES:

ATLANTA TIP # CO AR 180 CONG DIST. 6 6 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW 1998 CONST

UNDERWAY $ 2764 AFTER 99

COBB 713380
STATUS:

ATMS: I-75/COMMUNICA/SURVEILLANCE FM I-285 TO ALLGOOD ROAD

ATLANTA TIP # AR 217A

MISCELLANEOUS IMPROVEMENTS / SAFETY

CONG DIST. 6

LENGTH(Miles/km): 7.18/11.55262 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: CONG MIT./AIR QUAL

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

COBB 713750
STATUS:

I-575 CONSTRUCT BARRIER WALL
WALLS / SAFETY LENGTH(Miles/km): .20/.32180 MANAGER: KEVIN HOSEY NOT APPLICABLE

IN SOUTHBOUND GORE AREA OF I-75 - EXIST. LANES: 2 /PROPOSED LANES:

ATLANTA TIP # AR 187 CONG DIST. 6 2 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

COBB 721150
STATUS:

SR 3/US 41/COBB PKWY FM AKERS MILL RD TO WINDY RIDGE PKWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
LENGTH(Miles/km): .70/1.12630
MANAGER: G. ROSS COBB SGN CT 3-12-93--UTILITIES, PE & $100,000 CONSTRUCTION.

ATLANTA TIP # CO 080 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

COBB 721310
STATUS:

SR 120/ROSWELL RD FM SR 120LP TO PIEDMONT RD/MARIETTA/72Y310 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 1.43/2.30087
MANAGER: D. SMITH COBB REFUSED 5-23-91 UNTIL MORE SPECIFIC DESIGN IS COMPLETED

COBB 721680
STATUS:

SR 176/MARS HILL RD FRM SR 120/DALLAS HWY TO STILESBORO RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.35/6.99915 MANAGER: D. SMITH COBB SGN CONTRACT 1-5-95 FOR PE & UTILITIES

ATLANTA TIP # CO 177 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72Y310 IS AN ASSOCIATED PROJECT.
ATLANTA TIP # CO 124A CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $ GA. SHARE $ OTH SHARE $

0
0 2600 2080
520

PE 1997

UNDERWAY

ROW NONE

$

0

CONST 1998 $

70

FED SHARE $

70

GA. SHARE $

OTH SHARE $

PE 1992 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$ 5600

FED SHARE $ 4480

GA. SHARE $ 1020

OTH SHARE $ 100

PE 1997
ROW 1998 CONST

$

80

$ 1995

AFTER 99

PE 1992 UNDERWAY

ROW 1997

$ 6685

CONST 1998 $ 6101

FED SHARE $ 4881

GA. SHARE $ 1220

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 8

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

MARS HILL RD FM STILESBORO RD TO SR 3/COBB PARKWAY

721685 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

ATLANTA TIP # CO 124B CONG DIST. 6

PE NONE ROW 19.97

$

0

$ 4880

LENGTH(Mi1es/km): 3.13/5.03617 MANAGER: D. SMITH

FUND SOURCE: NAT'L HIGHWAY

CONST 1998 $ 5604 FED SHARE $ 4483

STATUS: COBB SGN CONTRACT 1-5-95 FOR PE & UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1121

OTH SHARE $

COBB 752220
STATUS:

SR 6 BUS OVER POWDER SPRINGS CRK W. OF POWDER SPRINGS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN REQ COUNTY DO UTILITIES 9-26-95

ATLANTA TIP # CO 247 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 UNDERWAY

ROW 1997 $

20

CONST 1998 $ 749

FED SHARE $

599

GA. SHARE $ 150

OTH SHARE $

COBB 752265
STATUS:

SR 6 BUS REALIGNMENT WITH POWDER SPRINGS ROAD
INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .20/.32180- EXIST. LANES: 2
MANAGER: D. GODWIN POWDER SPRINGS SGN ROW & UTILITIES 9-8-92; SEE

/PROPOSED LANES: 752260 OTO

ATLANTA TIP # CO 248B CONG DIST. 7 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW LOCL

CONST 1997

$

456

FED SHARE $ 410

GA. SHARE $

46

OTH SHARE $

COBB 752300
STATUS:

EAST-WEST CONN FM S COBB DR TO ATLANTA RD; PHASE 1 CONSTRUCTION OF NEW ROUTE WITH 6 LANES PROPOSED. LENGTH(Miles/km): .00/.00000
MANAGER: G. ROSS COBB SGN DO ROW, UTILITIES & 100% PE 3-26-93

ATLANTA TIP # CO AR 070A CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

5

AFTER 99

COBB 752310
STATUS:

OLD CANTON RD OVER SHEFFER CK TRIBUTARY/SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360
MANAGER: D. GODWIN COBB SGN CONTRACT FOR PE, ROW & UTILITIES 10-24-94

COBB 752630
STATUS:

CR 4455/CANTON ROAD & RR BR OVER SR 3/US 41 N OF MARIETTA
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN CT REQ CO DO PE/ROW/UTIL 8/95;MARIETTA SGN PUB UTIL 9/95

ATLANTA TIP # CO 246 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP # CO 272 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1997

$

741

FED SHARE $ 593

GA. SHARE $ 148

OTH SHARE $

PE 1998
ROW LOCL CONST

$

5

AFTER 99

COBB 770265
STATUS:

CR 4431/NEW SALEM RD SOUTH OF KENNESAW @ NOONDAY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN COBB SIGNED CONTRACT TO DO PE, RW, UTIL 12/11/95

ATLANTA TIP # CO 270 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1997
ROW LOCL CONST

$

5

AFTER 99

_...._ ...

'.:':

r;-__

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 9

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

CR 2121/HOLLOMAN RD WEST OF AUSTELL @ SWEETWATER CRK TRIB

770269 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

ATLANTA TIP # CO 268 CONG DIST. 7

PE 1997 $

5

ROW LOCL

LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN

FUND SOURCE: BRIDGE PROGRAM

CONST

AFTER 99

STATUS: CT SGN DO PE, ROW, UTIL 12/11/95.

FEDERAL HIGHWAY ADMIN FUNDS

COBB 770350
STATUS:

OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN CONTRACT SIGNED FOR PE, ROW & UTILITIES 3-17-95

ATLANTA TIP # CO 239 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

392

FED SHARE $ 314

GA. SHARE $

78

OTH SHARE $

COBB 770360
STATUS:

HIRAM RD/CR 2081 OVER POWDER SPRINGS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN CT SGN PE, ROW & UTIL 3-22-95; CO TO PAY 21K FOR ADDL WIDTH

ATLANTA TIP # CO 245 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1997

$

307

FED SHARE $ 246

GA. SHARE $

40

OTH SHARE $

21

COBB 770418
STATUS:

ATMS: INSTALL COMMUNICATION LINKS BETWEEN TMC AND COUNTY TCC

ATLANTA TIP # R 098B

MISCELLANEOUS IMPROVEMENTS / SAFETY

CONG DIST. 7 & 6

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: DEMONSTRATION PROGRAM

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

850

FED SHARE $ 680

GA. SHARE $ 170

OTH SHARE $

COBB 770585
STATUS:

CR 943/0LD VILLA RICA RD. @ WILD HORSE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN CT REQ COBB DO PE, RW, UTIL 8/28/95

ATLANTA TIP # CO 269 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW LOCL CONST

$

5

AFTER 99

COBB 770694
STATUS:

ATMS: NON-FREEWAY SURVEILLANCE SYSTEM IN COBB COUNTY MISCELLANEOUS IMPROVEMENTS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST, LANES: 0 /PROPOSED LANES:
MANAGER: KARL ALFF LGPA NOT APPLICABLE

ATLANTA TIP # AR 190E CONG DIST. 6 & 7 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

COBB 770730
STATUS:

CONCORD COVERED BR/CONCORD RD OVER NICKAJACK CREEK
BRIDGES / ENHANCEMENT LENGTH(Miles/km): ,00/.00000 MANAGER: G. ROSS DOT WILL PROVIDE THE 20% MATCH

ATLANTA TIP # CO 251 CONG DIST. 6
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE $

0

ROW NONE $

0

CONST 1997

$

385

FED SHARE $ 308

GA. SHARE $

77

OTH SHARE $

PE NONE $

0

ROW NONE $

0

CONST 1997 $

35

FED SHARE $

28

GA. SHARE $

7

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 10

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

ATMS: NON-FREEWAY COMMUNICATION FIBER OPTIC CABLE IN COBB CO

770893 MISCELLANEOUS IMPROVEMENTS / SAFETY

ATLANTA TIP # AR 224 CONG DIST. 6 & 7

PE NONE $

0

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1997 $ 530

MANAGER: KARL ALFF

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE $

424

STATUS: COBB SGN 12-11-95 TO MAINTAIN COMMUNICATION LINES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 106

OTH SHARE $

COBB 770920
STATUS:

SPRING ROAD FROM VILLAGE PKWY TO CAMPBELL ROAD

ATLANTA TIP # CO AR 177F

BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): .70/1.12630- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

91

FED SHARE $

73

GA. SHARE $

OTH SHARE $

18

COBB 770921
STATUS:

WINDY HILL RD FM COBB PKWY TO ATLANTA ROAD

ATLANTA TIP # CO AR 177A

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 6 & 7

LENGTH(Miles/km): 4.20/6.75780- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

650

FED SHARE $ 520

GA. SHARE $

OTH SHARE $ 130

COBB 770922
STATUS:

VILLAGE PKWY FM SPRING RD TO WINDY HILL ROAD

ATLANTA TIP # CO AR 177B

BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): 1.20/1.93080 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

165

FED SHARE $

132

GA. SHARE $

OTH SHARE $

33

COBB 770930
STATUS:

COBB PKWY FM LAKE PARK DR TO SPRING RD

ATLANTA TIP # CO AR 177G

SIDEWALKS / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1998

$

272

FED SHARE $ 218

GA. SHARE $

OTH SHARE $

54

COBB 770931
STATUS:

AUSTELL ROAD & CIRCLE 75 PARKWAY

ATLANTA TIP # CO AR 177CD

SIDEWALKS / ENHANCEMENT

CONG DI ST . 7 & 6

LENGTH(Miles/km): 6.00/9.65400 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

CT REQ COUNTY DOPE, UTIL, ROW & 20% CONSTRUCTION 9-4-96.

FEDERAL HIGHWAY ADMIN FUNDS

712752 IS AN ASSOCIATED PROJECT.

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

765

FED SHARE $

612

GA. SHARE $

OTH SHARE $

153

COBB 770960
STATUS:

SIDEWALKS FOR TRANSIT @ TOWN CENTER AREA

ATLANTA TIP # CO AR 165E

SIDEWALKS / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

429

FED SHARE $ 343

GA. SHARE $

OTH SHARE $

86

,......;.._-\._'.'

~--'

~'"":.?11

''~ ;,:._

\1'-:.:""- -~

~: -

\i-

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 9

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

* -P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

CR 2121/HOLLOMAN RD WEST OF AUSTELL @ SWEETWATER CRK TRIB

ATLANTA TIP CO 268

PE 1997 $

5

770269 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 7

ROW LOCL

LENGTH(Mi1es/km): .20/.32180

CONST

AFTER 99

MANAGER: D. GODWIN

FUND SOURCE: BRIDGE PROGRAM

STATUS: CT SGN DO PE, ROW, UTIL 12/11/95.

FEDERAL HIGHWAY ADMIN FUNDS

COBB 770350
STATUS:

OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN CONTRACT SIGNED FOR PE, ROW & UTILITIES 3-17-95

* ATLANTA TIP CO 239
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

392

FED SHARE $ 314

GA. SHARE $

78

OTH SHARE $

COBB 770360
STATUS:

HIRAM RD/CR 2081 OVER POWDER SPRINGS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN CT SGN PE, ROW & UTIL 3-22-95; CO TO PAY 21K FOR ADDL WIDTH

ATLANTA TIP # CO 245 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1997

$

307

FED SHARE $ 246

GA. SHARE $

40

OTH SHARE $

21

COBB 770418
STATUS:

ATMS: INSTALL COMMUNICATION LINKS BETWEEN TMC AND COUNTY TCC MISCELLANEOUS IMPROVEMENTS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: KARL ALFF LGPA NOT APPLICABLE

ATLANTA TIP # R 098B CONG DIST. 7 & 6 0
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

850

FED SHARE $ 680

GA. SHARE $ 170

OTH SHARE $

COBB 770585
STATUS:

CR 943/0LD VILLA RICA RD. @ WILD HORSE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180
MANAGER: D. GODWIN CT REQ COBB DO PE, RW, UTIL 8/28/95

ATLANTA TIP # CO 269 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW LOCL CONST

$

5

AFTER 99

COBB 770694
STATUS:

ATMS: NON-FREEWAY SURVEILLANCE SYSTEM IN COBB COUNTY MISCELLANEOUS IMPROVEMENTS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: KARL ALFF LGPA NOT APPLICABLE

LANES:

ATLANTA TIP # AR 190E CONG DIST. 6 & 7 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

COBB 770730
STATUS:

CONCORD COVERED BR/CONCORD RD OVER NICKAJACK CREEK
BRIDGES / ENHANCEMENT LENGTH(Miles/km): .00/.00000 MANAGER: G. ROSS DOT WILL PROVIDE THE 20% MATCH

ATLANTA TIP # CO 251 CONG DIST. 6
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE $

0

ROW NONE

$

0

CONST 1997

$

385

FED SHARE $

308

GA. SHARE $

77

OTH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST 1997

$

35

FED SHARE $

28

GA. SHARE $

7

OTH SHARE $

COUNTY P. I. NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

20-Sep-1996 Page 10

FISCAL YEAR

COST ESTS

COBB

ATMS: NON-FREEWAY COMMUNICATION FIBER OPTIC CABLE IN COBB CO

ATLANTA TIP # AR 224

PE NONE $

0

770893 MISCELLANEOUS IMPROVEMENTS / SAFETY

CONG DIST. 6 & 7

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1997 $ 530

MANAGER: KARL ALFF

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE $

424

STATUS: COBB SGN 12-11-95 TO MAINTAIN COMMUNICATION LINES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 106

OTH SHARE $

COBB 770920
STATUS:

SPRING ROAD FROM VILLAGE PKWY TO CAMPBELL ROAD BICYCLE/FED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .70/1.12630 -EXIST. LANES: 0 MANAGER: D. GODWIN TO BE DONE BY CONTRACT

/PROPOSED LANES:

ATLANTA TIP # CO AR 177F CONG DIST. 6
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

91

FED SHARE $

73

GA. SHARE $

OTH SHARE $

18

COBB 770921
STATUS:

WINDY HILL RD FM COBB PKWY TO ATLANTA ROAD

ATLANTA TIP # CO AR 177A

BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 6 & 7

LENGTH(Miles/km): 4.20/6.75780 -EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

650

FED SHARE $

520

GA. SHARE $

OTH SHARE $ 130

COBB 770922
STATUS:

VILLAGE PKWY FM SPRING RD TO WINDY HILL ROAD

ATLANTA TIP # CO AR 177B

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): 1.20/1.93080 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

165

FED SHARE $ 132

GA. SHARE $

OTH SHARE $

33

COBB 770930
STATUS:

COBB PKWY FM LAKE PARK DR TO SPRING RD

ATLANTA TIP # CO AR 177G

SIDEWALKS / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1998 $ 272

FED SHARE $ 218

GA. SHARE $

OTH SHARE $

54

COBB 770931
STATUS:

AUSTELL ROAD & CIRCLE 75 PARKWAY

ATLANTA TIP # CO AR 177CD

SIDEWALKS / ENHANCEMENT

CONG DIST. 7 & 6

LENGTH(Miles/km): 6.00/9.65400 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

CT REQ COUNTY DOPE, UTIL, ROW & 20% CONSTRUCTION 9-4-96.

FEDERAL HIGHWAY ADMIN FUNDS

712752 IS AN ASSOCIATED PROJECT.

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

765

FED SHARE $ 612

GA. SHARE $

OTH SHARE $ 153

COBB 770960
STATUS:

SIDEWALKS FOR TRANSIT @ TOWN CENTER AREA

ATLANTA TIP # CO AR 165E

SIDEWALKS / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

429

FED SHARE $ 343

GA. SHARE $

OTH SHARE $

86

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 11

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L--D--EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

SIDEWALKS FOR TRANSIT @ CUMBERLAND-GALLERIA AREA

ATLANTA TIP # CO AR 165A

PE 1996 UNDERWAY

770962 SIDEWALKS / ENHANCEMENT

CONG DIST. 6

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1997

$

174

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE $ 139

STATUS: CT REQ COUNTY DO PE, UTIL, ROW & 20% CONSTRUCTION 9-4-96.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

OTH SHARE $

35

COBB 770963
STATUS:

SIDEWALKS FOR TRANSIT @ WILDWOOD-INTERSTATE NORTH AREA SIDEWALKS / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: D. GODWIN CT REQ COUNTY DO PE, UTIL, ROW & 20% CONSTRUCTION 9-4-96.

ATLANTA TIP # CO AR 165B CONG DIST. 6 0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

444

FED SHARE $ 355

GA. SHARE $

OTH SHARE $

89

COBB 770964
STATUS:

SIDEWALKS FOR TRANSIT @ SOUTH COBB DRIVE AREA SIDEWALKS / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: D. GODWIN TO BE DONE BY CONTRACT

/PROPOSED LANES:

ATLANTA TIP # CO AR 165C CONG DIST. 6
0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997 $ 374

FED SHARE $ 299

GA. SHARE $

OTH SHARE $

75

COBB 770966
STATUS:

SIDEWALKS FOR TRANSIT @ SR 120, FRANKLIN RD & DELK RD SIDEWALKS / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: D. GODWIN TO BE DONE BY CONTRACT

LANES:

ATLANTA TIP # CO AR 165D CONG DIST. 6 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

516

FED SHARE $ 413

GA. SHARE $

OTH SHARE $

103

COBB 770973
STATUS:

BICYCLE/PEDESTRIAN FOR BIKE AWARENESS SIGNAGE & PARKING FAC'

ATLANTA TIP # CO AR 177E

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 6 & 7

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

30

FED SHARE $

24

GA. SHARE $

OTH SHARE $

6

COBB 771020
STATUS:

COBB/SMYRNA FM CAMP HIGHLAND RD TO PAULDING CO (OLD CSX RR)

ATLANTA TIP # CO 273

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): 8.90/14.32010 -EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1998 $ 500

FED SHARE $ 400

GA. SHARE $

OTH SHARE $

100

COBB 771022
STATUS:

MARIETTA MULTI USE TRAIL

ATLANTA TIP # CO 274

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 7

LENGTH(Miles/km): 1.30/2.09170 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW LOCL

CONST 1998

$

500

FED SHARE $ 400

GA. SHARE $

OTH SHARE $

100

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 12

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

CR 944/0LD DALLAS ROAD @NOSES CREEK 4.1 MI W OF MARIETTA

ATLANTA TIP # CO 271

PE 1997 $

10

771040 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 6

ROW LOCL

LENGTH(Miles/km): .20/.32180

CONST

AFTER 99

MANAGER: D. GODWIN

FUND SOURCE: BRIDGE PROGRAM

STATUS: CONTRACT REQUEST COUNTY DO PE, UTIL & ROW 7-29-96.

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

20-Sep-1996 Page 13

FISCAL YEAR

COST ESTS

DEKALB 7D751X
STATUS:

TRANSIT OPERATIONS PROGRAM; SEE FULTON 707510
TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 208B

CONG DIST. 0 & 0

OPERATING NONE

$

0

FUND SOURCE: URBAN TRANSIT

FEDERAL TRANSIT ADMIN FUNDS

707510 IS AN ASSOCIATED PROJECT.

DEKALB 7D752X
STATUS:

BUS RELATED PROCUREMENT - 50 BUSES SEE FULTON 707522 TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 302B

CONG DIST. 0 & 0

CAPITAL NONE

$

0

FUND SOURCE: URBAN TRANSIT DISC.

FEDERAL TRANSIT ADMIN FUNDS

707522 IS AN ASSOCIATED PROJECT.

DEKALB 7V7010
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH

ATLANTA TIP # DK AR 210B

CONG DIST. 4 & 11

CAPITAL 1997

$

80

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

64

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

8

OTH SHARE $

8

DEKALB 7V7025
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY MANAGER: STEVE KISH

ATLANTA TIP # DK AR 210C

CONG DIST. 4 & 11

CAPITAL 1998

$

84

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

67

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

8

OTH SHARE $

8

DEKALB 712870
STATUS:

I-20 @ LITHONIA INDUSTRIAL BLVD

ATLANTA TIP # DK AR 059

INTERCHANGE / NEW CONSTRUCTION

CONG DIST. 11

LENGTH(Mi1es/km): 3.50/5.63150 - EXIST. LANES: 0 /PROPOSED LANES: 4

MANAGER: G. ROSS

FUND SOURCE: DEMONSTRATION PROGRAM

COUNTY SIGNED 2-5-96 FOR UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1997

$ 6140

CONST 1997

$ 24675

FED SHARE $ 19740

GA. SHARE $ 4935

OTH SHARE $

DEKALB 713040
STATUS:

I-20 BARRIER WALLS @ CLOSE FRONTAGE RDS/ & ROCKDALE, NEWTON

ATLANTA TIP # DK AR 181

WALLS / MAINTENANCE

CONG DIST. 4 & 11

LENGTH(Miles/km): 18.70/30.08830 -EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: I-STATE MAINT.

REQ DEKALB, ROCKDALE & NEWTON DO UTILITIES 9-21-94

FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW NONE CONST

$

30

$

0

AFTER 99

DEKALB ATMS: COMMUN/SURVEIL'CE I-20 FM CAPITOL AE TO I-285/FULTON

ATLANTA TIP # AR 202

PE NONE

$

0

71315X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: KARL ALFF

FUND SOURCE: CONG MIT./AIR QUAL

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

713157 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

DEKALB 713220
STATUS:

I-20 @WESLEY CHAPEL RD RELOC FRONTAGE RD(SNAPFINER)71Y220

ATLANTA TIP # DK AR 182A

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 11

LENGTH(Miles/km): 1.38/2.22042 - EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: A. ALEXANDER

FUND SOURCE: I-STATE MAINT.

REQ DEKALB DO UTILITIES & SIDEWALKS 7-16-96.

FEDERAL HIGHWAY ADMIN FUNDS

71Y220 IS AN ASSOCIATED PROJECT.

DEKALB 713280
STATUS:

I-285 @ SR 10/MEMORIAL DR & RELOCATE GEORGE LUTHER DR;71Y280
INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: D. SMITH REQ DEKALB DO UTILITIES 4-17-96.

ATLANTA TIP # DK AR 205A
CONG DIST. 4 & 11 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71Y280 IS AN ASSOCIATED PROJECT.

DEKALB 713320
STATUS:

I-285 @ SR 8/US 29/LAWRENCEVILLE HWY & 71Y320 FOR NH $

ATLANTA TIP # DK AR 184

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 4

LENGTH(Miles/km): .70/1.12630 -EXIST. LANES: 4 /PROPOSED LANES: 6

MANAGER: BILL MOSKAL

FUND SOURCE: I-STATE MAINT.

REQ DEKALB DO UTILITIES 11-16-94

FEDERAL HIGHWAY ADMIN FUNDS

71Y320 IS AN ASSOCIATED PROJECT.

DEKALB 71340X
STATUS:

ATMS: I-285 CABLING, SEE FULTON CO - 713400

ATLANTA TIP # AR 200

UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: CONG MIT./AIR QUAL

FEDERAL HIGHWAY ADMIN FUNDS

713400 IS AN ASSOCIATED PROJECT.

DEKALB 713680
STATUS:

I-285 FM GLENWOOD RD TO I-85 SIGN REPLACEMENT W HI INTENSITY

ATLANTA TIP # AR 1300

SIGNING / SAFETY

CONG DIST. 4 & 11

LENGTH(Miles/km): 11.28/18.14952 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: I-STATE MAINT.

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 71Y220
STATUS:

I-20 @WESLEY CHAPEL RD RELOC FRONTAGE RD(SNAPFINER)713220 INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 2 /PROPOSED LANES:
MANAGER: A. ALEXANDER

ATLANTA TIP # DK AR 182B CONG DIST. 11 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 713220 IS AN ASSOCIATED PROJECT.

DEKALB 71Y320
STATUS:

I-285 @ SR 8/US 29/LAWRENCEVILLE HWY - FOR NH $ - SEE 713320

ATLANTA TIP # DK AR 184

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 4

LENGTH(Miles/km): .70/1.12630- EXIST. LANES: 4 /PROPOSED LANES: 6

MANAGER:

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

713320 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 14

FISCAL YEAR

COST ESTS

PE 1995 ROW 1998 CONST

UNDERWAY $ 1215
AFTER 99

PE 1997 ROW CONST

$

200

AFTER 99

AFTER 99

PE 1995 ROW 1998 CONST

UNDERWAY

$

85

AFTER 99

PE NONE

$

0

ROW NONE

$

0

CONST NONE $

0

PE NONE

$

ROW NONE $

CONST 1998 $

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 2000 1800
200

PE 1995 ROW 1998 CONST

UNDERWAY $ 1214 AFTER 99

PE 1995
ROW 19.98 CONST

UNDERWAY $ 3000 AFTER 99

"

,~.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 15

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--. I-.-N--O-. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DEKALB SR 124 @ STONE MOUNTAIN CRK

ATLANTA TIP # DK 099

PE 1992 UNDERWAY

721050 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.

CONG DIST. 4

ROW NONE $

0

LENGTH(Miles/km): .03/.04827

CONST 1998 $ 682

MANAGER: D. GODWIN

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 546

STATUS: SGN GWINNETT CO 2-19-87 & DEKALB 9-10-86 FOR UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 136

OTH SHARE $

DEKALB 721330
STATUS:

SR 124/ROCK CHAPEL RD FM UNION GR RD N TO MADDOX RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .90/1.44810 MANAGER: D. GODWIN DEKALB SGN 9-2-88 FOR UTILITIES.

ATLANTA TIP # DK 084 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY
ROW 1996 UNDERWAY
CONST 1998 $ 1576 FED SHARE $ 1261 GA. SHARE $ 315 OTH SHARE $

DEKALB 721535
STATUS:

SR 124 FM MADDOX RD TO ROCKBRIDGE RD / INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.10/4.98790 MANAGER: D. GODWIN REQ DEKALB CO DO UTILITIES 10-30-91

ATLANTA TIP # DK 085 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW 1997 UNDERWAY
CONST 1998 $ 5207 FED SHARE $ 4166 GA. SHARE $ 1041 OTH SHARE $

DEKALB 730970
STATUS:

SR 212/BROWNS MILL RD @ POLE BRIDGE CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .42/.67578
MANAGER: D. GODWIN REVISION REQUEST DEKALB DO UTILITIES 8-16-96.

ATLANTA TIP # DK 098 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1997

$

42

CONST 1997 $ 800

FED SHARE $ 640

GA. SHARE $ 160

OTH SHARE $

DEKALB 751370
STATUS:

CHAMBLEE-TUCKER RD FM NEW P'TREE RD TO BUFORD HWY/SR 13 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 1.40/2.25260
MANAGER: D. GODWIN DEKALB SGN FOR UTILITIES 4-25-94

ATLANTA TIP # DK 001B CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 75Y370 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW 19"95 UNDERWAY

CONST 1997 $ 2000

FED SHARE $ 1600

GA. SHARE $

400

OTH SHARE $

DEKALB 751495
STATUS:

SR 859/COOLEDGE-BROCKETT RD FM STONE MTN FWY-SR 8/W SIGNALS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.00/1.60900 MANAGER: D. GODWIN DEKALB SGN DO UTILITIES 3-5-90.

ATLANTA TIP # DK 079B CONG DIST. 4 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW CONST

$

42

AFTER 99

AFTER 99

DEKALB 752100
STATUS:

EAST PONCE DE LEON AT RAYS ROAD

ATLANTA TIP # DK 102

INTERSECTION IMPROVEMENT / RECST. OR REHAB.

CONG DIST. 4

LENGTH(Miles/km): .40/.64360- EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: D. GODWIN

FUND SOURCE: HWY. SAFETY

COUNTY SGN CONTRACT FOR PE, ROW & UTILITIES 7-14-94

FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1993 UNDERWAY

ROW LOCL

CONST 1997 $ 689

FED SHARE $ 620

GA. SHARE $

69

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 16

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

* -P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-ST--S--

DEKALB SR 155/CANDLER RD AT SHOAL CREEK AREA

ATLANTA TIP AR 157D

PE 1996 UNDERWAY

752770 SHOULDER WORK / SAFETY

CONG DIST. 4

LENGTH(Miles/km): .20/.32180- EXIST. LANES: 0 /PROPOSED LANES: 0

ROW 1998 CONST

$

23

AFTER 99

MANAGER: BILL MOSKAL

FUND SOURCE: HWY. SAFETY

STATUS: DECATUR SGN DO UTILITIES 3-21-96.

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 770840
STATUS:

SR 8 @ DEKALB IND WAY,SCOTTDALE; N DECATUR RD @ SCOTTDALE RD

ATLANTA TIP # DK 123

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 4

LENGTH(Miles/km): .20/.32180- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: HWY. SAFETY

DEKALB SGN FOR ROW & UTILITIES 8-23-94

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 770860
STATUS:

INSTALL TRAFFIC SIGNALS AT 52 INTERSECTION IN DEKALB COUNTY

* ATLANTA TIP DK 124

SIGNALS / SAFETY

CONG DIST. 4 & 11

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: HWY. SAFETY

DEKALB SIGNED FOR ROW & UTILILITIES 1-18-95

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 770910
STATUS:

SIDEWALKS AT KENSINGTON RD, COVINGTON HWY & MEMORIAL DRIVE

* ATLANTA TIP DK AR 165IJK

SIDEWALKS / NEW CONSTRUCTION

CONG DIST. 11 & 4

LENGTH(Miles/km): 1.79/2.88011 -EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 770911
STATUS:

SIDEWALKS AT BUFORD HWY, NEW PEACHTREE RD. & SHALLOWFORD RD.

ATLANTA TIP # DK AR 165CDE

SIDEWALKS / NEW CONSTRUCTION

CONG DIST. 4

LENGTH(Miles/km): 3.99/6.41991 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 770912
STATUS:

SIDEWALKS AT BRIARWOOD ROAD & DRESDEN ROAD

ATLANTA TIP # DK AR 165AB

SIDEWALKS / NEW CONSTRUCTION

CONG DIST. 4

LENGTH(Miles/km): 1.21/1.94689 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 770913
STATUS:

SIDEWALKS AT NEW PEACHTREE, PEACHTREE RDS. & PEACHTREE INDUS

* ATLANTA TIP DK AR 165FGH

SIDEWALKS / NEW CONSTRUCTION

CONG DIST. 4

LENGTH(Miles/km): 2.69/4.32821 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997 $ 123

FED SHARE $

111

GA. SHARE $

12

OTH SHARE $

PE NONE $

0

ROW LOCL

CONST 1997

$

350

FED SHARE $ 315

GA. SHARE $

35

OTH SHARE $

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

142

FED SHARE $ 114

GA. SHARE $

OTH SHARE $

28

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

316

FED SHARE $ 253

GA. SHARE $

OTH SHARE $

63

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997 $

96

FED SHARE $

77

GA. SHARE $

OTH SHARE $

19

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

213

FED SHARE $ 170

GA. SHARE $

OTH SHARE $

43

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999

20-Sep-1996 Page 17

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

ARC REGIONAL DEVELOPMENT COMMISSION

COMMENTS

FISCAL YEAR

COST ESTS

----------------------------------------------------------------------------------------------------------------------~------------

DEKALB RESTORE PONCE DE LEON LINEAR PARK EAST OF BRIARCLIFF--77Y990

ATLANTA TIP # AT 103

PE LOCL

770990 LANDSCAPING / ENHANCEMENT

CONG DIST. 4

ROW LOCL

LENGTH(Mi1es/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1997

$

720

MANAGER: D. CRANFORD

FUND SOURCE: TRANS. ENHANCE.

FED SHARE $

600

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

77Y990 IS AN ASSOCIATED PROJECT.

OTH SHARE $

120

DEKALB 770992
STATUS:

SOUTH PEACHTREE CREEK TRAIL

ATLANTA TIP # DK 212

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 4

LENGTH(Miles/km): 4.00/6.43600 -EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. CRANFORD

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1997

$

700

FED SHARE $ 560

GA. SHARE $

OTH SHARE $ 140

DEKALB 771037
STATUS:

MARTA SERVICE EXPANSION: COVINGTON HWY

ATLANTA TIP # M AR 161C

TRANSIT PROJECTS / CAPITAL

CONG DIST. 11

LENGTH(Miles/km): ,00/.00000- EXIST, LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: CONG MIT./AIR QUAL

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE $

0

CONST 1997

$

145

FED SHARE $ 116

GA. SHARE $

OTH SHARE $

29

DEKALB 77Y990
STATUS:

RESTORE PONCE DE LEON LINEAR PARK-FOR 1998 FUNDS; SEE 770990 LANDSCAPING / ENHANCEMENT LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: UNKNOWN TO BE DONE BY CONTRACT

ATLANTA TIP # AT 103 CONG DIST. 4 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS 770990 IS AN ASSOCIATED PROJECT.

PE LOCL

ROW LOCL

CONST 1998

$

250

FED SHARE $

200

GA. SHARE $

OTH SHARE $

50

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P. I. NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

DOUGLAS 7D7516
STATUS:

CAPITAL/PLANNING - MULTI-USE FACILITY & EXPR. TRANSIT STUDY
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH

ATLANTA TIP # DO AR 301B CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

20-Sep-1996 Page 18

FISCAL YEAR

COST ESTS

CAPITAL 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1114 891 111 111

DOUGLAS 7D7528
STATUS:

TRANSIT OPERATING ASSISTANCE FOR FY 1997
TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH

ATLANTA TIP # DO AR 300B

CONG DIST. 7

OPERATING 1997 $

31

FUND SOURCE: URBAN TRANSIT

FED SHARE $

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

16

DOUGLAS 7D7529
STATUS:

TRANSIT OPERATING ASSISTANCE FOR FY 1998 TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH

ATLANTA TIP # DO AR 300C

CONG DIST. 7

OPERATING 1998 $

31

FUND SOURCE: URBAN TRANSIT

FED SHARE $

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

16

DOUGLAS 7D7530
STATUS:

CAPITAL IMPROVEMENT - TRANSIT PROJECT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY
MANAGER: STEVE KISH

ATLANTA TIP # DO AR 301C CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$ 150

FED SHARE $ 120

GA. SHARE $

15

OTH SHARE $

15

DOUGLAS 7V7012
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY
MANAGER: STEVE KISH

ATLANTA TIP # DO AR 213B

CONG DIST. 7

CAPITAL 1997

$

30

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

DOUGLAS 7V7026
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY MANAGER: STEVE KISH

ATLANTA TIP # DO AR 213C

CONG DIST. 7

CAPITAL 1998

$

31

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

DOUGLAS 712930
STATUS:

SR 92 BRIDGE & APPROACHES OVER I-20 IN DOUGLASVILLE/71Y930

ATLANTA TIP # DO AR 208A

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 7

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 4 /PROPOSED LANES: 7

MANAGER: KEVIN HOSEY

FUND SOURCE: I-STATE MAINT.

REQ CITY DO UTIL 7-20-92; DOUGLAS CO SGN 8-18-92 PUB UTIL.

FEDERAL HIGHWAY ADMIN FUNDS

71Y930 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1997 ROW 1998 CONST

$

30

$ 150

AFTER 99

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

DOUGLAS 713490
STATUS:

I-20 @ SR 61 CONN INTERCHANGE RECONSTRUCTION CONSTRUCTION OF NEW ROUTE WITH 0 LANES PROPOSED.
LENGTH(Miles/km): .00/.00000 MANAGER: J. GRAYBEAL RESUB TO CO DO ROW & UTIL 3-10-95; CITY SGN 2-28-95 ROW/UTIL

ATLANTA TIP # DO 017A CONG DIST. 7
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

DOUGLAS 721320
STATUS:

BANKHEAD HWY FM SWEETWATER RD E TO THORNTON RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.10/1.76990 MANAGER: D. SMITH

DOUGLAS 721420
STATUS:

SR 92 FM S/SR 166 NE TO LAKE MONROE RD/CR 140 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.26/3.63634 MANAGER: KEVIN HOSEY
DOUGLAS SIGNED FOR UTILITIES 5-2-95

ATLANTA TIP # DO 016 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721380 IS AN ASSOCIATED PROJECT.
ATLANTA TIP # DO 028 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 19

FISCAL YEAR

COST ESTS

PE 1995 UNDERWAY

ROW LOCL

CONST 1997

$ 2100

FED SHARE $ 1680

GA. SHARE $ 420

OTH SHARE $

PE 1992 ROW 1998 CONST

UNDERWAY $ 1595 AFTER 99

PE 1992
ROW 1997 CONST

UNDERWAY
$ 2301 AFTER 99

DOUGLAS 751820
STATUS:

DOUGLAS BLVD EXT FM CR 814 TO CR 115 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 1.80/2.89620 MANAGER: J. GARLAND REQ DOUGLASVILLE DO ROW, UTIL & DET 4-17-96.

ATLANTA TIP # DO 032 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$ 103 AFTER 99

DOUGLAS 751825
STATUS:

DOUGLAS BLVD EXT FM CR 142 TO CR 814 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
LENGTH(Miles/km): 2.00/3.21800 MANAGER: J. GARLAND REQ DOUGLASVILLE DO ROW, UTIL & DET 5-10-96.

ATLANTA TIP # DO 031 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$ 103 AFTER 99

DOUGLAS 770975
STATUS:

BICYCLE/PEDESTRIAN FAC'S FOR SIGNAGE, BICYCLE/FED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. MANAGER: D. GODWIN TO BE DONE BY CONTRACT

RACKS & STRIPING LANES: 0 /PROPOSED LANES:

ATLANTA TIP # DO AR 177A CONG DIST. 7
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

DOUGLAS 770976
STATUS:

BICYCLE/PEDESTRIAN SIGNS, RACKS, STRIPING @ LITHIA SPGS BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: D. GODWIN TO BE DONE BY CONTRACT

ATLANTA TIP # DO AR 177B CONG DIST. 7 0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

31

FED SHARE $

25

GA. SHARE $

OTH SHARE $

6

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997 $

5

FED SHARE $

4

GA. SHARE $

OTH SHARE $

1

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

20-Sep-1996 Page 20

FISCAL YEAR

COST ESTS

FAYETTE 3V7013
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH

ATLANTA TIP # FA AR 100B

CONG DIST. 3

CAPITAL 1997

$

30

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

FAYETTE 3V7024
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH

ATLANTA TIP # FA AR 100C

CONG DIST. 3

CAPITAL 1998

$

31

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

FAYETTE 321964
STATUS:

SR 85 FM SR 74 N TO BERNHARD RD/CR 126 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.30/5.30970 MANAGER: M. REYNOLDS FAYETTE REFUSED TO DO UTILITIES 2-17-93

ATLANTA TIP # FA 005 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 321966 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1998 CONST

UNDERWAY $ 2155 AFTER 99

FAYETTE 322350
STATUS:

SR 74 FM JUST SOUTH OF CROSSTOWN RD NW TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.15/3.45935
MANAGER: M. REYNOLDS REQ P'TREE CITY DO UTIL 5-22-96;FAYETTE REFUSED UTIL 5/96.

ATLANTA TIP # FA 009B CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1998 CONST

UNDERWAY $ 5079 AFTER 99

FAYETTE 322650
STATUS:

SR 74 AT PASCHALL ROAD IN PEACHTREE CITY

ATLANTA TIP # FA 009A

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 3

LENGTH(Miles/km): .40/.64360- EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

PEACHTREE CITY SIGNED FOR ROW & UTILITIES 2-16-95

FEDERAL HIGHWAY ADMIN FUNDS

FAYETTE 322670
STATUS:

SR 74 @ 8 INTERSECTIONS BET SENOIA RD & MILAM RD/FULTON

ATLANTA TIP # FA 019

ACCELERATION/DECEL LANE / SAFETY

CONG DIST. 3

LENGTH(Miles/km): 2.60/4.18340 - EXIST. LANES: 4 /PROPOSED LANES: 5

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

REQ CO RU 1/96;PCHTREE CTY SGN RU 5/95;TYRONE SGN RU 6/95

FEDERAL HIGHWAY ADMIN FUNDS

FAYETTE 72104X
STATUS:

SR 54 @ MORNING & CAMP CRKS; FLINT RIVER/SEE CLAYTON CO

ATLANTA TIP # CL 023

UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: M. REYNOLDS

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

721040 IS AN ASSOCIATED PROJECT.

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1994

UNDERWAY

ROW LOCL

CONST 1997

$

195

FED SHARE $

176

GA. SHARE $

20

OTH SHARE $

PE NONE

$

ROW LOCL

CONST 1998 $

FED SHARE $

GA. SHARE $

OTH SHARE $

0
1163 1047
116

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

FAYETTE 721440
STATUS:

SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 ... & CLAYTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 5.30/8.52770
MANAGER: M. REYNOLDS CLAYTON SGN 4/95 & WANTS COST EST; FAYETTE SGN $75K 6/95

ATLANTA TIP # CL 041 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72144X IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 21

FISCAL YEAR

COST ESTS

PE 1997 ROW CONST

$ 144 AFTER 99 AFTER 99

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

20-Sep-1996 Page 22

FISCAL YEAR

COST ESTS

FULTON 7D7507
STATUS:

RAIL CONSTRUCTION PROGRAM - NORTH LINE EXTENSION - MEDICAL
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 300B

CONG DIST. 5 & 4

CAPITAL 1997

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

73250 58600
14650

FULTON 7D7508
STATUS:

FIXED GUIDEWAY MODERNIZATION PROGRAM - LINE STRUCTURE REHAB, TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 3018

CONG DIST. 5 & 4

CAPITAL 1997

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

7247 5798
1449

FULTON 7D7509
STATUS:

FIXED GUIDEWAY MODERNIZATION PROGRAM - LINE STRUCTURE REHAB, TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 301C

CONG DIST. 5 & 4

CAPITAL 1998

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

7247 5798
1449

FULTON 7D7510
STATUS:

TRANSIT OPERATING ASSISTANCE FOR FY 1997 TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 208B

CONG DIST. 5 & 4

FUND SOURCE: URBAN TRANSIT

OPERATING 1997

$

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

7D751X IS AN ASSOCIATED PROJECT.

OTH SHARE $

4925 2463
2463

FULTON 7D7511
STATUS:

CAPITAL/PLANNING - CAPITAL MAINTENANCE, BUS PROCUREMENT, TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 210B CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

25126 20101
5025

FULTON 7D7521
STATUS:

RAIL CONSTRUCTION PROGRAM - NORTH LINE EXTENSION - MEDICAL TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 300C

CONG DIST. 5 & 4

CAPITAL 1998

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

65125 52100
13025

FULTON 7D7522
STATUS:

BUS RELATED PROCUREMENT - 50 BUSES TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 302B

CONG DIST. 5 & 4

CAPITAL 1997

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

7D752X IS AN ASSOCIATED PROJECT.

OTH SHARE $

14500 11600
2900

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

"'

'>

___ ~:; ~--- ~'

;.:-..____,

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 23

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON BUS RELATED PROCUREMENT - 96 BUSES

ATLANTA TIP # M AR 302C

7D7523 TRANSIT PROJECTS / CAPITAL

CONG DIST. 5 & 4

FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CAPITAL 1998

$ 27840

FUND SOURCE: URBAN TRANSIT DISC,

FED SHARE $ 22272

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $ 5568

FULTON 7D7525
STATUS:

TRANSIT OPERATING ASSISTANCE FOR FY 1998 TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 208C CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1998 $ FED SHARE $
GA. SHARE $ OTH SHARE $

4715 2358
2358

FULTON 7D7526
STATUS:

CAPITAL/PLANNING - CAPITAL MAINTENANCE, BUS PROCUREMENT, TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

ATLANTA TIP # M AR 210C CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

25126 20101
5025

FULTON 7D7544
STATUS:

ATLANTA-ATHENS COMMUTER RAIL LINE-FOR PRELIMINARY RAIL PROJECTS / PLANNING FUNDS RECIPIENT: MANAGER: STEVE KISH ENGINEERING STUDIES; ALSO CLARKE COUNTY

7D754Z

ATLANTA TIP # AR 235

CONG DIST. 5 & 10

PLANNING 1997

$

145

FUND SOURCE: NON FEDERAL TRANSIT

FED SHARE $

7D754Z IS AN ASSOCIATED PROJECT.

GA. SHARE $

145

OTH SHARE $

FULTON 7V7015
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY
MANAGER: STEVE KISH

ATLANTA TIP # FN/S AR 200B

CONG DIST. 5

CAPITAL 1997

$

87

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

70

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

9

OTH SHARE $

9

FULTON 7V7027
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY MANAGER: STEVE KISH

ATLANTA TIP # FN/S AR 200C

CONG DIST. 5

CAPITAL 1998

$

91

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

73

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

9

OTH SHARE $

9

FULTON 712360
STATUS:

I-285 @ WASHINGTON RD/INCL WDN WASHINGTO RD 600' W OF BR
INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .51/.82059 -EXIST. LANES: 4 /PROPOSED LANES: MANAGER: D. CHURCH SIGNED CITY OF EAST POINT 3-16-87 FOR UTILITIES

ATLANTA TIP # FS 017A CONG DIST. 5 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1988 UNDERWAY

ROW 1991 UNDERWAY

CONST 1998

$ 2286

FED SHARE $ 2057

GA. SHARE $ 229

OTH SHARE $

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 24

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-OM--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON I-75 @ MT PARAN ROAD - RELOC RAMP; & 71Y940-IM RW

ATLANTA TIP # AR 105A

PE 1993 UNDERWAY

712940 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 5

LENGTH(Miles/km): .30/.48270- EXIST. LANES: 0 /PROPOSED LANES: 0

ROW NONE CONST 1997

$

0

$ 2162

MANAGER: G. ROSS

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE $ 1730

STATUS: CITY OF ATLANTA HAS NO UTIL INVOLVED.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

432

71Y940 IS AN ASSOCIATED PROJECT.

OTH SHARE $

FULTON 712950
STATUS:

I-85 @ MONROE DRIVE & 71Y950 FOR 04M $ FOR R/W

ATLANTA TIP # AT AR 106B

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 4

LENGTH(Miles/km): .30/.48270- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: G. ROSS

FUND SOURCE: CONG MIT./AIR QUAL

CITY OF ATLANTA HAS NO UTILITIES INVOLVED.

FEDERAL HIGHWAY ADMIN FUNDS

71Y950 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1997

$ 4590

FED SHARE $ 3672

GA. SHARE $ 918

OTH SHARE $

FULTON 713157
STATUS:

ATMS: COMMUN/SURVEIL'CE I-20 FM CAPITOL AE TO I-285/DEKA

ATLANTA TIP # AR 202

MISCELLANEOUS IMPROVEMENTS / SAFETY

CONG DIST. 11 & 5

LENGTH(Miles/km): 9.70/15.60730- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: CONG MIT./AIR QUAL

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

71315X IS AN ASSOCIATED PROJECT.

PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $
GA. SHARE $ OTH SHARE $

0
0 6400 5120 1280

FULTON 713310
STATUS:

I-285 @ SR 54/JONESBORO RD; & 71Y310 INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 5 /PROPOSED LANES: MANAGER: D. SMITH REQ FULTON DO UTILITIES 4-17-96;FOREST PARK REF DO UTL 5-96.

ATLANTA TIP # AT AR 204A CONG DIST. 5
8 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71Y310 IS AN ASSOCIATED PROJECT.

PE 1997 ROW CONST

$ 400 AFTER 99 AFTER 99

FULTON 713330
STATUS:

I-285 SOUTH TO I-20 WEST RAMP GEOMETRY WEST OF ATLANTA

ATLANTA TIP # AT AR 178

RAMP / RECST. OR REHAB.

CONG DIST. 5

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: D. SMITH

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW 1998 CONST

UNDERWAY $ 100 AFTER 99

FULTON 713400
STATUS:

ATMS: I-285 SURVEILL FM I-75 IN COBB E TO I-85 IN DEKALB

ATLANTA TIP # AR 200

MISCELLANEOUS IMPROVEMENTS / SAFETY

CONG DIST. 5 & 6

LENGTH(Miles/km): 13.17/21.19053 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: CONG MIT./AIR QUAL

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

71340X IS AN ASSOCIATED PROJECT.

FULTON 71Y940
STATUS:

I-75 @ MT PARAN ROAD - FOR 04M RW $; INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .30/.48270- EXIST.
MANAGER: UNKNOWN

SEE 712940 LANES: 0 /PROPOSED

LANES:

ATLANTA TIP # AT AR 105B CONG DIST. 5 0 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712940 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE $

ROW NONE $

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 2000 1600 400

PE 1993 ROW 1997 CONST NONE

UNDERWAY

UNDERWAY

$

0

<"-

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 25

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--. I-.-N--O-. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON I-85 @ MONROE DRIVE - FOR 04M R/W FUNDS; SEE 712950

ATLANTA TIP # AT AR 106A

PE 1993 UNDERWAY

71Y950 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 4

ROW 1997

$ 12100

LENGTH(Miles/km): .30/.48270- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE $

0

MANAGER:

FUND SOURCE: I-STATE MAINT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

712950 IS AN ASSOCIATED PROJECT.

FULTON 720570
STATUS:

BANKHEAD HWY/SR 8 FM PROCTOR CRK TO E OF SCL RR BRIDGE RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. LENGTH(Miles/km): .51/.82059
MANAGER: BILL MOSKAL CITY OF ATLANTA SIGNED 9/6/89 FOR UTILITIES

ATLANTA TIP # AT 004 CONG DIST. 5
FUND SOURCE: NAT 1 L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1998 CONST

UNDERWAY
$ 1421 AFTER 99

FULTON 721010
STATUS:

SR 9/ROSWELL FM DUNWOODY PL TO 5-LANE SECTION N OF HILL ST RECONSTRUCTION & WIDENING FROM 3 LANES TO 4 LANES. LENGTH(Miles/km): 2.20/3.53980 MANAGER: RAY METTS REQ FULTON DO P UTL 5/96;CT REQ ROSWELL DO PE, UTIL 3-28-96

ATLANTA TIP # FN 007A CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1998 CONST

UNDERWAY $ 9000 AFTER 99

FULTON 721460
STATUS:

SR 9 @ C'HOOCHEE RVR & BIG CK & INT @ AZALEA & RIVERSIDE/"Y" REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 8 LANES.
LENGTH(Miles/km): .49/.78841 MANAGER: RAY METTS REQ CO DO P UTIL 12-2-91;CT REQ ROSWELL DO PE 1 UTIL 3-28-96

ATLANTA TIP # FN 007B CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72Y460 IS AN ASSOCIATED PROJECT.

FULTON 721810
STATUS:

SR 166/LAKEWOOD FWY @ GREENBRIAR PKWY/CAMPBELLTON RD ML9.37

ATLANTA TIP # AT 062

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 5

LENGTH(Miles/km): .84/1.35156 - EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: D. CHURCH

FUND SOURCE: NAT'L HIGHWAY

REQ ATLANTA DO UTIL & EAST POINT PUB UTIL 12-29-94

FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1997 $ 2312

CONST 1998

$ 6092

FED SHARE $ 4874

GA. SHARE $ 1218

OTH SHARE $

PE 1997 ROW 1998 CONST

UNDERWAY $ 10800 AFTER 99

FULTON 721850
STATUS:

SR 400 @ HAMMOND, ABERNATHY, CD SYSTEM

ATLANTA TIP # FN AR 100

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 5

LENGTH(Miles/km): 1.75/2.81575 -EXIST. LANES: 8 /PROPOSED LANES: 12 .

MANAGER: G. BOWMAN

FUND SOURCE: NAT'L HIGHWAY

CO SGN CONTRACT FOR $4.9M TOWARD PE, ROW, UTIL & CST 5-5-93

FEDERAL HIGHWAY ADMIN FUNDS

FULTON 721930
STATUS:

SR 120/0LD MILTON PARKWAY AT STATE BRIDGE ROAD TURN LANES / SAFETY LENGTH(Miles/km): .36/.57924- EXIST. LANES: 2 MANAGER: G. BOWMAN N0 UTILITY COST 8-9-95; RW UNDER 751410

/PROPOSED

LANES:

ATLANTA TIP # FN 048B CONG DIST. 6 4 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1993 UNDERWAY
ROW 1997 $ 15207 CONST 1997 $ 54875
FED SHARE $ 43900 GA. SHARE $ 6075
OTH SHARE $ 4900

PE NONE $

0

ROW NONE $

0

CONST 1997 $ 182

FED SHARE $ 182

GA. SHARE $

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 26

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R-. -------E-S-T-S--

FULTON SR 9 @ C'HOOCHEE RVR/INCL INT - FOR 33P FUNDS; SEE 721460

ATLANTA TIP # FN 007C

PE NONE

$

0

72Y460 BRIDGES / RECST. OR REHAB.

CONG DIST. 6

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000 MANAGER: RAY METTS STATUS:

FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

CONST 1998

$

480

FED SHARE $

432

GA. SHARE $

48

721460 IS AN ASSOCIATED PROJECT.

OTH SHARE $

FULTON 730756
STATUS:

SOUTH FULTON PKWY FM CAPPS FERRY RD TO COCHRAN MILL RD CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 6.10/9.81490
MANAGER: G. ROSS FULTON SGN DO ROW, UTIL & DESIGN 12-6-89.

ATLANTA TIP # FS 036B CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

5

AFTER 99

FULTON 731430
STATUS:

OLD MILTON PKY(ST BRIDGE) FM ALPHA CT TO PARK BRIDGE PKWY

ATLANTA TIP # FN 015B

LANDSCAPING / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): 2.34/3.76506- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: G. BOWMAN

FUND SOURCE: SURFACE TRANSPORT.

REQ FULTON TO MAINTAIN ALL LANDSCAPING 7/1/96.

FEDERAL HIGHWAY ADMIN FUNDS

FULTON 731580
STATUS:

SR 141/PEACHTREE ROAD/TOWER PLACE DRIVE

ATLANTA TIP # AT 099

TURN LANES / SAFETY

CONG DIST. 5

LENGTH(Miles/km): .20/.32180- EXIST. LANES: 6 /PROPOSED LANES: 7

MANAGER: G. BOWMAN

FUND SOURCE: HWY. SAFETY

REQ ATLANTA DO UTILITIES 2-5-96.

FEDERAL HIGHWAY ADMIN FUNDS

FULTON 742482
STATUS:

SR 166/LAKEWOOD FWY EB EXIT RAMP @ SYLVAN RD INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .19/.30571- EXIST. LANES: MANAGER: D. GODWIN OTO REQ EAST POINT DO ROW, UTIL 10-13-94

4 /PROPOSED LANES:

ATLANTA TIP # AT AR 116 CONG DIST. 5
4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE $

0

CONST 1997

$

288

FED SHARE $ 230

GA. SHARE $

58

OTH SHARE $

PE 1996 UNDERWAY

ROW 1997 $ 150

CONST 1997

$

179

FED SHARE $

161

GA. SHARE $

18

OTH SHARE $

PE 1997 ROW NONE CONST

$

5

$

0

AFTER 99

FULTON 742860
STATUS:

SPALDING DR FM MT VERNON RD TO SR 140

ATLANTA TIP # FN OBB

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 6

LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: D. GODWIN

FUND SOURCE: HWY. SAFETY

FEDERAL HIGHWAY ADMIN FUNDS

742B6X IS AN ASSOCIATED PROJECT.

FULTON 750780
STATUS:

BANKHEAD HWY/SR B FM HARWELL RD TO SR 280/HIGHTOWER RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1. 30/2.09170 MANAGER: D. SMITH CITY OF ATLANTA SGN DO ROW & UTILITIES 4-16-96.

ATLANTA TIP # AT 001 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW LOCL CONST

$

40

AFTER 99

PE 1997
ROW LOCL CONST

$

5

AFTER 99

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 27

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON HOWELL MILL RD/ATLANTA FM OLD CHATTAHOOCHEE TO BELLMEADE AVE

ATLANTA TIP # AT 026

PE 1997

$

9

751560 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 5

ROW LOCL

LENGTH(Miles/km): .10/.16090

CONST

AFTER 99

MANAGER: D. CHURCH

FUND SOURCE: SURFACE TRANSPORT.

STATUS: CITY OF ATLANTA SGN DO ROW & UTILITIES 4-16-96.

FEDERAL HIGHWAY ADMIN FUNDS

FULTON 751900
STATUS:

SR 14/US 29/PETERS ST FM FAIR TO NELSON OVER RR & SPRING ST REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450 MANAGER: A. ALEXANDER REQ CITY OF ATLANTA DO UTILITIES 7-18-95

FULTON 752020
STATUS:

PEACHTREE ST @ GEORGIA RR & MARTA AT UNDERGROUND ATLANTA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450 MANAGER: A. ALEXANDER REQ CITY OF ATLANTA DO RUD 4-19-95;FULTON N/A 5-8-96.

FULTON 752030
STATUS:

INTERNATIONAL BLVD @ CSX & NORFOLK-SOUTHERN RR @ THE OMNI REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450 MANAGER: A. ALEXANDER REQ CITY OF ATLANTA DO ROW, UTILITIES & DETOURS 4-19-95

FULTON 752040
STATUS:

ROXBORO RD FM E PACES FERRY RD TO ROCKHAVEN CIR & SOU RR BR BRIDGES / REPLACEMENT LENGTH(Miles/km): .18/.28962 MANAGER: G. BOWMAN ATLANTA SIGNED FOR ROW, UTILITIES & 100% PE 2-17-95

ATLANTA TIP # AT 071 CONG DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP # AT 069 CONG DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP # AT 068 CONG DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP # AT 009A CONG DIST. 4 & 5 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1997

$ 6671

CONST 1998

$ 4711

FED SHARE $ 3769

GA. SHARE $

942

OTH SHARE $

PE 1992

UNDERWAY

ROW LOCL

CONST 1998

$ 2021

FED SHARE $ 1617

GA. SHARE $

404

OTH SHARE $

PE 1993 UNDERWAY

ROW LOCL

CONST 1998

$ 1580

FED SHARE $ 1264

GA. SHARE $

316

OTH SHARE $

PE 1998 ROW LOCL CONST

$

50

AFTER 99

FULTON 752070
STATUS:

SR 139/MLK DR AT FAIRBURN RD AND BAKERS FERRY ROAD INTERSECTION IMPROVEMENT / RECST. OR REHAB. LENGTH(Miles/km): .30/.48270- EXIST. LANES: 4 /PROPOSED LANES:
MANAGER: D. GODWIN ATLANTA REQ CT FOR ROW, UTIL, PE & ALL CST OVER BOOK 7/15/96

ATLANTA TIP # AT 079A CONG DIST. 5 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1033 795 5 233

FULTON 752075
STATUS:

SR 139/MLK JR DR FM HIGHTOWER RD TO BARFIELD AVE INTERSECTION IMPROVEMENT / RECST. OR REHAB. LENGTH(Miles/km): .42/.67578- EXIST. LANES: 4 /PROPOSED LANES:
MANAGER: D. GODWIN ATLANTA SGN CT FOR ROW, UTIL, PE & 20% CST 8-11-95 - 752070

ATLANTA TIP # AT 079B CONG DIST. 5 5 FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH _SHARE $

1000 800
200

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

FULTON 752230
STATUS:

SR 54/JONESBORO RD. OVER THE SOUTH RIVER IN ATLANTA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN ATLANTA SIGNED FOR UTILITIES 2-17-95

ATLANTA TIP # AT 095 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 752320
STATUS:

POWERS FERRY RD/CR 300 OVER LONG ISLAND CREEK
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .31/.49879
MANAGER: D. GODWIN REQ FULTON COUNTY DO ROW, UTILITIES & DETOURS 4-19-95

ATLANTA TIP # FN 085 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 752520
STATUS:

CS 1985/MITCHELL STREET @ SOUTHERN RAILROAD .2 MI W OF SR 3E REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .29/.46661 MANAGER: A. ALEXANDER ATLANTA SGN DO ROW, UTILITIES & DETOURS 2-17-95

ATLANTA TIP # AT 097 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 752540
STATUS:

CS 2661/HOLLYWOOD ROAD @ PROCTOR CREEK 1.8 MIN OF JCT US 78 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN ATLANTA SGN FOR ROW, UTILITIES & NECESSARY DETOURS 2-17-95

ATLANTA TIP # AT 081 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 752545
STATUS:

CR 1349/FAIRBURN ROAD @ CSX RAILROAD .5 MI S OF JCT SR 166 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN ATLANTA SGN DO ROW, UTILITIES & DETOURS 10-3-95 (FULTON N/A)

ATLANTA TIP # AT 096 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 752550
STATUS:

CS 1259/LAKEWOOD AVE @ NORFOLK SOUTHERN RR S. OF MILTON ST REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: D. GODWIN CT REQ ATLANTA DO PE, UTIL & ROW 5-14-96.

ATLANTA TIP # AT 023 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 752560
STATUS:

CS 3586/SPRING STREET @ SOU RR, CSX RR REPLACEMENT REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .48/.77232 MANAGER: A. ALEXANDER CT REQ ATLANTA DO PE, UTIL & ROW 7-19-96.

ATLANTA TIP # AT 086B CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 28

FISCAL YEAR

COST ESTS

PE 1995 UNDERWAY

ROW 1997 $

50

CONST 1998 $ 585

FED SHARE $ 468

GA. SHARE $ 117

OTH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1997 $ 389

FED SHARE $ 311

GA. SHARE $

78

OTH SHARE $

PE 1995 UNDERWAY ROW LOCL
CONST 1998 $ 3100 FED SHARE $ 2480 GA. SHARE $ 620 OTH SHARE $

PE 1995 UNDERWAY ROW LOCL
CONST 1997 $ 592 FED _$HARE $ 474 GA. SHARE $ 118 OTH SHARE $

PE 1996 UNDERWAY ROW LOCL
CONST 1998 $ 880 FED SHARE $ 704 GA. SHARE $ 176 OTH SHARE $

PE 1996 UNDERWAY ROW LOCL
CONST 1998 $ 1519 FED SHARE $ 1215 GA. SHARE $ 304 OTH SHARE $

PE 1997 ROW LOCL CONST

$ 211 AFTER 99

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 29

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON CR 1349/FAIRBURN ROAD @ CSX RAILROAD 1.8 MI S OF INT SR 139

ATLANTA TIP # AT 100

PE 1996 UNDERWAY

752570 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 5

ROW LOCL

LENGTH(Miles/km): .22/.35398
MANAGER: D. GODWIN STATUS: REQ FULTON & ATLANTA DO ROW, UTILITIES & DETOURS 8-26-94

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CONST 1998

$

FED SHARE $

GA. SHARE $

1342 1074
268

OTH SHARE $

FULTON 752580
STATUS:

CR 495/0LD FAIRBURN ROAD @ CAMP CREEK .03 MI S CAMP CRK PKY REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES. LENGTH(Miles/km): .21/.33789 MANAGER: D. GODWIN REQ FULTON COUNTY DO ROW, UTILITIES & DETOURS 8-26-94

ATLANTA TIP # FS 069 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

871

FED SHARE $

697

GA. SHARE $ 174

OTH SHARE $

FULTON 752620
STATUS:

CS 3242/PINE GROVE ROAD @ WILLEO CREEK AT W. ROSWELL CITY LI REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN REQ FULTON RUD 7/95;COBB SGN RUO 6/96;ROSWELL SGN PUR 5/96.

ATLANTA TIP # FN 096 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

13

AFTER 99

FULTON 752650
STATUS:

HAYNES BRIDGE RD FM OLD ALABAMA RD TO BIG CREEK RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.37/3.81333 MANAGER: G. BOWMAN TO BE DONE BY CONTRACT.

ATLANTA TIP # FN 031 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

5

AFTER 99

FULTON 752710
STATUS:

CS 3498/ATLANTA RD @ CHATTAHOOCHEE RIVER FULTON-COBB CO LINE REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .30/.48270
MANAGER: D. GODWIN REQ FULTON/ATLANTA DO RUD 3-5-96;COBB SGN DO RUD 5-14-96.

ATLANTA TIP # AT 104 CONG DIST. 5 & 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

45

AFTER 99

FULTON 762370
STATUS:

SR 400 DETENTION POND @ LONGLEAF RD & STRATFORD RD. MISCELLANEOUS IMPROVEMENTS / NEW CONSTRUCTION LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: G. BOWMAN ATLANTA SGN CT FOR MAINTENANCE OF PARK & LIGHTING 9-20-94

ATLANTA TIP # AT AR 196 CONG DIST. 5
0 FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 UNDERWAY

ROW 1997

$ 1700

CONST 1997

$ 2376

FED SHARE $ 1901

GA. SHARE $

475

OTH SHARE $

FULTON 770274
STATUS:

CR 593/0LD BILL COOK RD S OF COLLEGE PRK @ KIMBERLY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .15/.24135 MANAGER: D. GODWIN REQ FULTON DO ROW, UTIL & DET 4/95;REQ CITY UTL 9/96.

ATLANTA TIP # FS 063 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 UNDERWAY

ROW LOCL

CONST 1997

$

174

FED SHARE $

139

GA. SHARE $

35

OTH SHARE $

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 30

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

* -P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON ATLANTA MULTI-MODAL PASSENGER TERMINAL

ATLANTA TIP AR 120

PE 1994

UNDERWAY

770310 TRANSIT PROJECTS / NEW CONSTRUCTION

CONG DIST. 5

ROW 1997

$ 20000

LENGTH(Miles/km): .50/.80450- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1997

MANAGER: J. CHAMBERS

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE $ 84000

STATUS: ATLANTA SGN CT 20% PE 9-8-93; FUNDS:FHWA 31%,FTA 49% ATL 20%

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 21000

OTH SHARE $

FULTON 770388
STATUS:

ATMS: VARIABLE MSG SIGNS/ADVISORY RADIO ON "I" BEYOND I-285

* ATLANTA TIP AR 193

SIGNING / SAFETY

CONG DIST. 4 & 11

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: CONG MIT./AIR QUAL

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 $

5

ROW NONE $

0

CONST 1997

$

800

FED SHARE $

640

GA. SHARE $ 160

OTH SHARE $

FULTON 770398
STATUS:
FULTON 770410
STATUS:

ATMS NON-FREEWAY ADVANCED TRAVELER INFORMATION SYSTEM

* ATLANTA TIP AR 098B2

MISCELLANEOUS IMPROVEMENTS / SAFETY

CONG DIST. 5 & 11

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: DEMONSTRATION PROGRAM

OTO WILL DO LGPA

FEDERAL HIGHWAY ADMIN FUNDS

ATMS ADVANCED VEHICLE IDENTIFICATION SYSTEM

* ATLANTA TIP AR 225

MISCELLANEOUS IMPROVEMENTS / SAFETY

CONG DIST. 6 & 4

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: DEMONSTRATION PROGRAM

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1997

$ 1000

FED SHARE $ 800

GA. SHARE $ 200

OTH SHARE $

PE NONE

$

0

ROW NONE $

0

CONST 1997

$

400

FED SHARE $ 320

GA. SHARE $

80

OTH SHARE $

FULTON ATMS: NON-FREEWAY COMMUNICATION FIBER OPTIC CABLE-FULTON

* ATLANTA TIP AR 226

PE NONE $

0

770420 MISCELLANEOUS IMPROVEMENTS / SAFETY

CONG DIST. 5

LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0

ROW NONE $

0

CONST 1997 $ 380

MANAGER: KARL ALFF

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE $ 304

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

76

OTH SHARE $

FULTON 770597
STATUS:

BICYCLE FACILITIES AT COMMUTER AREAS - 1998 FUNDS REMAINING BICYCLE/FED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED LANES: MANAGER: UNKNOWN NOT APPLICABLE

* ATLANTA TIP AR 177C
CONG DIST. 5
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 UNDERWAY

ROW NONE $

0

CONST 1998

$ 2746

FED SHARE $ 2197

GA. SHARE $

OTH SHARE $ 549

FULTON 770605
STATUS:

ATMS: TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN FULTON COUNTY

* ATLANTA TIP FN86/FS68

SIGNALS / SAFETY

CONG DIST. 5 & 6

LENGTH(Miles/km): 11.14/17.92426- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: CONG MIT./AIR QUAL

REQ FULTON DO ROW, UTIL, PE & 20% CONSTRUCTION 7-15-93

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1997 $ 460

FED SHARE $ 368

GA. SHARE $

OTH SHARE $

92

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 31

PROJECT LISTING BY RDC FY t997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR-O--JE-C-T---D-A-TA---------R--EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C-O--M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-ST--S--

FULTON ATMS: MOBILITY ENHANCEMENT PROGRAM ADDITIONAL 770639 SIGNALS / SAFETY

ATLANTA TIP # AR 176A CONG DIST. 5 & 4

PE 1997

$

11

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: CONG MIT./AIR QUAL

CONST 1997

$

743

FED SHARE $

594

STATUS: NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

OTH SHARE $

149

FULTON 770690
STATUS:

ATMS: NON-FREEWAY SURVEILLANCE SYSTEM IN FULTON COUNTY MISCELLANEOUS IMPROVEMENTS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED
MANAGER: KARL ALFF LGPA NOT APPLICABLE

LANES:

ATLANTA TIP # AR 190A CONG DIST. 5 & 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE

$

0

CONST 1997

$

481

FED SHARE $

385

GA. SHARE $

96

OTH SHARE $

FULTON 770870
STATUS:

OLD NATIONAL HWY FM FLAT SHOALS RD N TO SULLIVAN RD

ATLANTA TIP # FS AR 165A

SIDEWALKS / SAFETY

CONG DIST. 5 & 4

LENGTH(Miles/km): 1.70/2.73530 -EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

244

FED SHARE $ 195

GA. SHARE $

OTH SHARE $

49

FULTON 770873
STATUS:

ATMS: ARTERIAL ROUTES IN ATL-INSTALL COMM CABLE & HWD/DEKALB SIGNALS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: KARL ALFF NOT APPLICABLE

ATLANTA TIP # AR 201B CONG DIST. 5 & 4
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 1000
800 200

FULTON 770900
STATUS:

CS 3101/GRIMES BRIDGE ROAD @ BIG CREEK IN SOUTH ROSWELL REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .22/.35398 MANAGER: D. GODWIN FULTON HAS NO INVOLVED UTIL;ROSWELL SGN DO PE, U, ROW, 5/96

ATLANTA TIP # FN 095 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

53

AFTER 99

FULTON 770923
STATUS:

OLD ALABAMA FM RIVERSIDE DR TO MARKET BLVD

ATLANTA TIP # FN AR 177C

BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): 1.20/1.93080 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: G. BOWMAN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

FULTON 770926
STATUS:

MEDLOCK BRIDGE FM PARSONS RD TO CHATTAHOOCHEE RIVER, PHASE 2
BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: D. GODWIN TO BE DONE BY CONTRACT

ATLANTA TIP # FN AR 177D CONG DIST. 6
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

332

FED SHARE $

266

GA. SHARE $

OTH SHARE $

66

PE.1996

UNDERWAY

ROW NONE

$

0

CONST 1997

$

282

FED SHARE $

226

GA. SHARE $

OTH SHARE $

56

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 32

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-ST--S--

FULTON MEDLOCK BRIDGE FM PARSONS RD TO CHATTAHOOCHEE RIVER, PHASE 1

ATLANTA TIP # FN AR 177A

PE 1996 UNDERWAY

770927 BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

ROW NONE $

0

CONST 1997

$

70

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE $

56

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

OTH SHARE $

14

FULTON 770932
STATUS:

CASCADE RD FM ATLANTA CL WEST TO DANFORTH RD

ATLANTA TIP # FS AR 177

SIDEWALKS / ENHANCEMENT

CONG DIST. 5

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1998

$

583

FED SHARE $ 466

GA. SHARE $

20

OTH SHARE $

97

FULTON 770933
STATUS:

HOLCOMB BR RD FM WEST OF BIG CK TOE OF SR 400(INCL BR'S)

ATLANTA TIP # FN AR 177B

SIDEWALKS / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): 1.34/2.15606 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

385

FED SHARE $ 308

GA. SHARE $

OTH SHARE $

77

FULTON 770951
STATUS:

MARTA ADA PARATRANSIT/RAIL STATION MODIFICATIONS; PHASE 4

ATLANTA TIP # M AR 151B

TRANSIT PROJECTS / CAPITAL

CONG DIST. 5

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: LUKE COUSINS

FUND SOURCE: SURFACE TRANSPORT.

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE $

CONST 1997 $

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 4000 3200
800

FULTON 770952
STATUS:

MARTA ADA PARATRANSIT/RAIL STATION MODIFICATIONS; PHASE 5

ATLANTA TIP # M AR 151C

TRANSIT PROJECTS / CAPITAL

CONG DIST. 5

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: LUKE COUSINS

FUND SOURCE: SURFACE TRANSPORT.

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $
GA. SHARE $ OTH SHARE $

0 0 2080 1664
416

FULTON 770965
STATUS:

SIDEWALKS FOR TRANSIT @ FULTON INDUSTRIAL BLVD SIDEWALKS / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0
MANAGER: D. GODWIN TO BE DONE BY CONTRACT

/PROPOSED LANES:

ATLANTA TIP # FS AR 16SE CONG DIST. 5
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

579

FED SHARE $ 463

GA. SHARE $

OTH SHARE $ 116

FULTON 770967
STATUS:

SIDEWALKS FOR TRANSIT @ ABERNATHY RD & ROSWELL RD

ATLANTA TIP # FN AR 165A

SIDEWALKS / ENHANCEMENT

CONG DIST. 5

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997 $ 750

FED SHARE $ 600

GA. SHARE $

OTH SHARE $ 150

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

~-----'

~;;

_)

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999

20-Sep-1996 Page 33

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON BICYCLE/PEDESTRIAN - PATH FOUNDATION OUTREACH MATERIALS/ ATL

ATLANTA TIP # AT AR 177D

PE NONE

$

0

770971 BICYCLE/FED. FACILITY / ENHANCEMENT

GONG DIST. 5

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1998 $

48

MANAGER: D. SCHNEIDER

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE $

38

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

OTH SHARE $

10

FULTON 770977
STATUS:

BICYCLING COURSES (REGIONAL)

ATLANTA TIP # AR 177B

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 5 & 4

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. SCHNEIDER

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

13

FED SHARE $

10

GA. SHARE $

OTH SHARE $

3

FULTON 770980
STATUS:

MARTA INTELLIGENT TRANSPORTATION SYSTEM (REGIONAL) TRANSIT PROJECTS / OPERATIONS LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: LUKE COUSINS NOT APPLICABLE

LANES:

ATLANTA TIP # M AR 197B CONG DIST. 5 & 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 2770 2216
554

FULTON 770985
STATUS:

ATMS: MOBILITY ENHANCEMENT PROGRAM ADDITIONAL SIGNALS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: KARL ALFF NOT APPLICABLE

/PROPOSED

LANES:

ATLANTA TIP # AR 176C CONG DIST. 5 & 4 0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE

$

0

CONST 1998

$

567

FED SHARE $

454

GA. SHARE $

OTH SHARE $

113

FULTON 770986
STATUS:

ATMS: MOBILITY ENHANCEMENT PROGRAM ADDITIONAL SIGNALS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: KARL ALFF NOT APPLICABLE

/PROPOSED

LANES:

ATLANTA TIP # AR 176B CONG DIST. 5 & 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 1700 1360
340

FULTON 770988
STATUS:

AIR QUALITY ENHANCEMENT PROGRAM - 1997 FUNDING MISCELLANEOUS IMPROVEMENTS / PLANNING LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: D. SCHNEIDER NOT APPLICABLE

ATLANTA TIP # AR 203 CONG DIST. 5 & 4
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE

$

0

CONST 1997

$

750

FED SHARE $

600

GA. SHARE $

OTH SHARE $

150

FULTON 771010
STATUS:

ATLANTA REGIONAL RIDESHARE PROGRAM

ATLANTA TIP # AR 159

RIDE SHARING / OTHER

CONG DIST. 5 & 4

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: CONG MIT./AIR QUAL

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 4000 4000

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 34

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON MARTA SERVICE EXPANSION - 1998 FUNDING

ATLANTA TIP i M AR 1600

PE NONE

$

0

771011 TRANSIT PROJECTS / CAPITAL

CONG DIST. 5 & 4

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1998

$

976

MANAGER:

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE $

781

STATUS: NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

OTH SHARE $ 195

FULTON 771012
STATUS:

MARTA EXPRESS BUS ROUTE FOR 1997

ATLANTA TIP i M AR 160C

TRANSIT PROJECTS / OPERATIONS

CONG DIST. 5 & 4

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: CONG MIT./AIR QUAL

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE $

0

CONST 1997

$

685

FED SHARE $

548

GA. SHARE $

OTH SHARE $

137

FULTON 771021
STATUS:

ROSWELL TRAIL ALONG RIVERSIDE DRIVE & OLD RR @ SR 9

ATLANTA TIP i FN 098

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1998

$

500

FED SHARE $ 400

GA. SHARE $

OTH SHARE $ 100

FULTON 771030
STATUS:

MARTA INTELLIGENT TRANSPORTATION SYSTEM (REGIONAL) TRANSIT FACILITIES / CAPITAL LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: UNKNOWN NOT APPLICABLE

LANES:

ATLANTA TIP i M AR 197C CONG DIST. 5 & 4 0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 2770 2216
554

FULTON 771036
STATUS:

MARTA OPERATION ENHANCEMENT-SIGNAL PRIORITY SYSTEM (2 LOC) SIGNALS / CAPITAL LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: LUKE COUSINS NOT APPLICABLE

ATLANTA TIP # M AR 164B CONG DIST. 5 & 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1997

$

30

ROW NONE $

0

CONST 1997

$

400

FED SHARE $ 320

GA. SHARE $

OTH SHARE $

80

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 35

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA---------R--EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C-O--M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

GWINNETT CAPITAL/PLANNING - LARGE BUSES, SMALL BUSES, COMM. EQUIPMENT

ATLANTA TIP # GW AR 201B

107147 TRANSIT PROJECTS / CAPITAL

CONG DIST. 4 & 10

FUNDS RECIPIENT: GWINNETT COUNTY

CAPITAL 1997

$ 3272

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT

FED SHARE $ 2618

STATUS: SERVICES PROJECT

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $ 327

OTH SHARE $

327

GWINNETT TRANSIT OPERATING ASSISTANCE FOR FY 1997 1D7148 TRANSIT PROJECTS / OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE

ATLANTA TIP # GW AR 200B CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1997

$

472

FED SHARE $ 228

GA. SHARE $

OTH SHARE $

244

GWINNETT CAPITAL - COMMUNICATIONS EQUIPMENT, 1D7149 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: PLANNING AND TECHNICAL ASSISTANCE

FARE COLLECTION EQUIP.,

ATLANTA TIP # GW AR 201C CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1071 857 107 107

GWINNETT TRANSIT OPERATING ASSISTANCE FOR FY 1998 1D7150 TRANSIT PROJECTS / OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH
STATUS:

ATLANTA TIP # GW AR 200C CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1998

$

472

FED SHARE $ 228

GA. SHARE $

OTH SHARE $

244

GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1V7017 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH STATUS:

ATLANTA TIP # GW AR 215B

CONG DIST. 4 & 10

CAPITAL 1997

$

75

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

60

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

8

OTH SHARE $

8

GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1V7022 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH
STATUS:

ATLANTA TIP # GW AR 215C

CONG DIST. 4 & 10

CAPITAL 1998

$

79

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

63

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

8

OTH SHARE $

8

GWINNETT I-85 FM S OF BOGGS RD TO N OF SUGARLOAF PKWY & CD & 11Y231

ATLANTA TIP # GW AR 072C

110231 INTERCHANGE / NEW CONSTRUCTION

CONG DIST. 6

LENGTH(Miles/km): 2.30/3.70070- EXIST. LANES: 8 /PROPOSED LANES: 12

MANAGER: J, GRAYBEAL

FUND SOURCE: I-STATE MAINT.

STATUS: CT REQ COUNTY DO PE, UTIL 2-6-96

FEDERAL HIGHWAY ADMIN FUNDS

11Y231 IS AN ASSOCIATED PROJECT.

PE NONE ROW 1997 CONST

$

0

$ 4620

AFTER 99

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

P.I.NO.

PROJECT DATA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

GWINNETT I-85 FM N OF SUGARLOAF TON OF OLD P'TREE & CD SYSTEM&11Y233

* ATLANTA TIP GW AR 072E

110233 INTERCHANGE / NEW CONSTRUCTION

CONG DIST. 6

LENGTH(Mi1es/km): 1.70/2.73530- EXIST. LANES: 8 /PROPOSED LANES: 12

MANAGER: J. GRAYBEAL

FUND SOURCE: I-STATE MAINT.

STATUS: CT REQ COUNTY DO PE, UTIL 2-6-96

FEDERAL HIGHWAY ADMIN FUNDS

11Y233 IS AN ASSOCIATED PROJECT.

GWINNETT I-985 @ SR 20 (SR 20 TO 3 LANES)

* ATLANTA TIP GW AR 069

110330 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 10

LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: B. FERGUSON

FUND SOURCE: NAT'L HIGHWAY

STATUS: GWINNETT SGN 12-18-92 FOR PUB UTIL; BUFORD REFUSED 2-13-92

FEDERAL HIGHWAY ADMIN FUNDS

GWINNETT I-85/SR 403 AT SR 316 INTERCHANGE

* ATLANTA TIP GW AR 053A

110530 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 4

LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 8 /PROPOSED LANES: 8

MANAGER: J. GRAYBEAL

FUND SOURCE: I-STATE MAINT.

STATUS: CT REQ COUNTY DO PE, UTIL 2-6-96

FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 36

FISCAL YEAR

COST ESTS

PE NONE ROW 1998 CONST

$

0

$ 4065

AFTER 99

PE 1993 ROW 1997 CONST

UNDERWAY $ 1919 AFTER 99

PE 1998 ROW 1998 CONST

$ 100 $ 5500 AFTER 99

GWINNETT I-85 FM BOGGS RD TO SUGARLOAF PKWY - TO SHOW NH FUNDS;110231 11Y231 INTERCHANGE / RECST. OR REHAB.
LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 8 /PROPOSED LANES: MANAGER: J. GRAYBEAL STATUS:

ATLANTA TIP # GW AR 0720 CONG DIST. 6 12 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
110231 IS AN ASSOCIATED PROJECT.

PE NONE ROW 1997 CONST

$

0

$ 380

AFTER 99

GWINNETT I-85 FM SUGARLOAF TO OLD PEACHTREE - FOR NH FUNDS;SEE 110233 11Y233 INTERCHANGE / RECST. OR REHAB.
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 8 /PROPOSED LANES: MANAGER: J. GRAYBEAL
STATUS:

ATLANTA TIP # GW AR 072F CONG DIST. 6 12 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 110233 IS AN ASSOCIATED PROJECT.

PE NONE ROW 1998 CONST

$

0

$ 500

AFTER 99

GWINNETT CLYDE WILLIAMS BLVD CONN FM RONALD REAGAN PKY TO SR 124&INTS 122720 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
LENGTH(Miles/km): 1.00/1.60900 MANAGER: J. GRAYBEAL STATUS: REQ GWINNETT COUNTY DO UTILITIES 8-26-94
GWINNETT SR 13/BUFORD HWY FM OLD PEACHTREE RD TO SUGARLOAF PKWY 132360 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1.30/2.09170 MANAGER: KEVIN HOSEY STATUS: REQ COUNTY DO UTILITIES, ROW & 20% CONSTRUCTION 1-22-93

* ATLANTA TIP GW 137
CONG DIST. 4
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWA.Y ROW 1997 $ 1800 CONST 1998 $ 15700
FED SHARE $ 12560 GA. SHARE $ 3140 OTH SHARE $

* ATLANTA TIP GW 099
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

20

AFTER 99

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

GWINNETT SUGARLOAF PKWY FROM LAKES PKWY (500' N OF SR 316) 132470 CONSTRUCTION OF NEW ROUTE WITH 6 LANES PROPOSED.
LENGTH(Miles/km): 1.12/1.80208 MANAGER: J. GRAYBEAL STATUS: CT REQ GWINNETT DO PE, ROW, UTILITIES 7-26-95

TO SR 120

ATLANTA TIP # GW 092 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 37

FISCAL YEAR

cOST ESTS

PE 1997 ROW LOCL CONST

$

5

AFTER 99

GWINNETT SR 324 AT SR 124

ATLANTA TIP # GW 131B

141805 INTERSECTION IMPROVEMENT / SAFETY

cONG DIST. 10

LENGTH(Miles/km): .60/.96540- EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: L. OWENS

FUND SOURCE: HWY. SAFETY

STATUS: GWINNETT SIGNED FOR PUBLIC UTILITIES 12-18-92; SEE #141800

FEDERAL HIGHWAY ADMIN FUNDS

GWINNETT KILLIAN HILL RD FM FIVE FORKS TRICKUM TO US 78 150270 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): .00/.00000 MANAGER: D. SMITH STATUS: CT REQ COUNTY DO PE, UTIL, ROW & 20% CST 4/22/96.
GWINNETT CR 235/ALCOVY ROAD @ ALCOVY RIVER 3 MI NE OF LAWRENCEVILLE 171210 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .19/.30571 MANAGER: L. OWENS STATUS: REQ GWINNETT COUNTY DO ROW, UTILITIES & DETOURS 9-26-95

ATLANTA TIP # GW 007B CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 150320 IS AN ASSOCIATED PROJECT.
ATLANTA TIP # GW 140 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

GWINNETT SR 13/BUFORD HWY FM DEKALB CO. LINE TO BEAVER RUIN ROAD

ATLANTA TIP # GW AR 177A

171260 SIDEWALKS / NEW CONSTRUCTION

CONG DIST. 4

LENGTH(Miles/km): 3.80/6.11420 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. OWENS

FUND SOURCE: CONG MIT./AIR QUAL

STATUS: CT SGN COUNTY DO PE, UTILITIES, ROW & 20% CONST. 4-10-96.

FEDERAL HIGHWAY ADMIN FUNDS

GWINNETT SR 141/P'TREE PKWY FM SPALDING DR TO CHATTAHOOCHEE RIVER

ATLANTA TIP # GW AR 177B

171330 BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 6

LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. OWENS

FUND SOURCE: CONG MIT./AIR QUAL

STATUS: CT REQ COUNTY DOPE, UTIL, ROW & 20% CST 3-27-96.

FEDERAL HIGHWAY ADMIN FUNDS

GWINNETT SIDEWALKS ON BRECKINRIDGE RD AND SATELLITE BLVD 171340 SIDEWALKS /ENHANCEMENT
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: L. OWENS STATUS: CT REQ COUNTY DO PE, UTIL, ROW & 20% CST 4-1-96.

ATLANTA TIP # GW AR 177CD CONG DIST. 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1994

UNDERWAY

ROW 1997

$ 2620

CONST 1997

$ 1100

FED SHARE $

990

GA. SHARE $

110

OTH SHARE $

PE 1997 ROW LOCL CONST

$

20

AFTER 99

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

407

FED SHARE $

326

GA. SHARE $

81

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1997

$

430

FED SHARE $ 344

GA. SHARE $

OTH SHARE $

86

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

210

FED SHARE $ 168

GA. SHARE $

OTH SHARE $

42

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

126

FED SHARE $

101

GA. SHARE $

OTH SHARE $

25

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

GWINNETT SIDEWALKS ON PLEASANT HILL ROAD
171341 SIDEWALKS /ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED
MANAGER: L. OWENS STATUS: CT REQ COUNTY DO PE, UTIL, ROW & 20% CST 3-27-96.

LANES:

ATLANTA TIP # GW AR 177F
CONG DIST. 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

GWINNETT SHACKLEFORD ROAD & STEVE REYNOLDS BLVD

ATLANTA TIP # GW AR 177E

171342 SIDEWALKS / ENHANCEMENT

CONG DIST. 4

LENGTH(Miles/km): 1.47/2.36523 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. OWENS

FUND SOURCE: CONG MIT./AIR QUAL

STATUS: CT REQ COUNTY DO PE, UTIL, ROW & 20% CST 3-28-96.

FEDERAL HIGHWAY ADMIN FUNDS

GWINNETT CR 1959/CENTERVILLE-ROSEBUD RD @ BIG HAYNES CREEK 171350 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180
MANAGER: L. OWENS STATUS: GWINNETT SGN DO ROW, PUB UTL & DET 3-20-96, REF PVT UTIL.

ATLANTA TIP # GW 216 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 38

FISCAL YEAR

COST ESTS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1998

$

426

FED SHARE $

341

GA. SHARE $

OTH SHARE $

85

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

141

FED SHARE $ 112

GA. SHARE $

OTH SHARE $

29

PE 1997 ROW LOCL CONST

$

10

AFTER 99

GWINNETT SR 124 FM ROCKBRIDGE RD/DEKALB TO CENTERVILLE; SEE DEKALB 72153X UNKNOWN / UNKNOWN

ATLANTA TIP # GW 076A CONG DIST. 0 & 0

PE NONE $

0

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: NAT'L HIGHWAY

CONST NONE $

0

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

721530 IS AN ASSOCIATED PROJECT,

GWINNETT SPALDING DR FROM MT VERNON RD TO SR 140 @ INTER; SEE FULTON

ATLANTA TIP # FN 088

PE NONE $

0

74286X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE

$

0

LENGTH(Miles/km): ,00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: UNKNOWN

FUND SOURCE: HWY. SAFETY

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

742860 IS AN ASSOCIATED PROJECT.

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96, (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997IFY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

20-Sep-1996 Page 39

FISCAL YEAR

COST ESTS

HENRY 3V7018
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN HENRY COUNTY
MANAGER: STEVE KISH

ATLANTA TIP # HE AR 102B

CONG DIST. 3 & 11

CAPITAL 1997

$

30

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

HENRY 3V7025
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: AGENCIES IN HENRY COUNTY
MANAGER: STEVE KISH

ATLANTA TIP # HE AR 102C

CONG DIST. 3 & 11

CAPITAL 1998

$

31

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

HENRY 311120
STATUS:

SR 20/SR 81 OVER I-75 BRIDGES I RECST. OR REHAB.
LENGTH(Mileslkm): .8111.30329
MANAGER: J. GRAYBEAL COUNTY SIGNED 11-14-85 FOR ROW AND UTILITIES.

ATLANTA TIP # HE 001A CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1987

UNDERWAY

ROW 1997

$ 1500

CONST 1998

$ 4274

FED SHARE $ 3847

GA. SHARE $

427

OTH SHARE $

HENRY 311840
STATUS:

I-75 @ JONESBORO RDICR 655

ATLANTA TIP # HE AR 209

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 3

LENGTH(Miles/km): .201.32180- EXIST. LANES: 6 /PROPOSED LANES: 6

MANAGER: KEVIN HOSEY

FUND SOURCE: NAT'L HIGHWAY

REQ HENRY COUNTY DO UTILITIES 1-26-95

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996

UNDERWAY

ROW 1997

$ 1200

CONST 1998

$ 2964

FED SHARE $ 2371

GA. SHARE $

593

OTH SHARE $

HENRY 321145
STATUS:

N-S 1-WAY PAIR/MCDONOUGH FM N/RACETRACK RD TO N/CARMICAEL ST CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Mileslkm): 1.2011.93080 MANAGER: KEVIN HOSEY CITY OF McDONOUGH SGN FOR UTILITIES 8-30-95

ATLANTA TIP # HE 010 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 331980 IS AN ASSOCIATED PROJECT.

PE 1992

UNDERWAY

ROW 1997

$ 1406

CONST 1997

$

883

FED SHARE $

706

GA. SHARE $ 177

OTH SHARE $

HENRY 321530
STATUS:

E-W 1-WAY PAIR/MCDONOUGH ALONG SR 20/81 FM SOU RR TO ECL CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 1.80/2.89620 MANAGER: KEVIN HOSEY CITY OF MCDONOUGH & HENRY COUNTY SGN FOR ROW & UTIL 8-30-95

ATLANTA TIP # HE 008 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 331990 IS AN ASSOCIATED PROJECT.

PE 1995

UNDERWAY

ROW LOCL

CONST 1997

$ 1133

FED SHARE $

906

GA. SHARE $ 227

OTH SHARE $

HENRY 331360
STATUS:

CR 650IHAMPTON RD FM I-75 EAST TO SR 42 IN LOCUST GROVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .64/1.02976 MANAGER: M. GANNAWAY COUNTY SIGNED 8-6-85 FOR ROW & UTILITIES

ATLANTA TIP # HE 003 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996

UNDERWAY

ROW LOCL

CONST 1997

$ 1454

FED SHARE $ 1163

GA. SHARE $

291

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

ARC

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

HENRY 33152X
STATUS:

SR 155 NB 11.8-0.25 HENRY;SB UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000 MANAGER: GORDON BROWN

1.6-3.1/SEE SPALDING- 331520 - EXIST. LANES: 0 /PROPOSED LANES:

ATLANTA TIP # CU SPAL. CO CONG DIST. 0 & 0 0 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 331520 IS AN ASSOCIATED PROJECT.

HENRY 331550
STATUS:

SR 20 EB FM MP 14.41 TO 13.21; WB MP 13.28 TO 11.74 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.74/4.40866 MANAGER: GORDON BROWN REQ HENRY DO UTILITIES 4-22-96.

ATLANTA TIP # HE 011 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

HENRY 331980
STATUS:

SR 920/JONESBORO RD FM I-75 TO END 1-WAY PAIR IN MCDONOUGH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.20/5.14880
MANAGER: KEVIN HOSEY HENRY SGN 8-30-95 FOR UTIL, STRUCK THRU ROW REQUEST

ATLANTA TIP # HE 007A CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 321145 IS AN ASSOCIATED PROJECT.

HENRY 331990
STATUS:

SR 920/JONESBORO ROAD @ BIRCH CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. LENGTH(Mi1es/km): .25/.40225 MANAGER: KEVIN HOSEY REQ HENRY DO ROW, UTILITIES AND DETOURS 10-2-95

ATLANTA TIP # HE 007B CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 321530 IS AN ASSOCIATED PROJECT.

HENRY 371440
STATUS:

SCHOOL BICYCLE RACK PROGRAM FOR HENRY COUNTY

ATLANTA TIP # HEAR 177A

BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 3

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: J. LEONI

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

HENRY 371442
STATUS:

BICYCLE/PEDESTRIAN SCHOOL SIGNAGE PROGRAM/1996
BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0
MANAGER: J. LEONI TO BE DONE BY CONTRACT

/PROPOSED

LANES:

ATLANTA TIP # HEAR 177B CONG DIST. 3
0 FUND.SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

HENRY 371444
STATUS:

BICYCLE/PEDESTRIAN SCHOOL BIKE RACK PROGRAM

ATLANTA TIP #HEAR 177C

BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 3

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: J. LEONI

FUND SOURCE: CONG MIT./AIR QUAL

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 40

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

PE 1992 UNDERWAY

ROW 1997

$

380

CONST 1998

$ 1165

FED SHARE $

932

GA. SHARE $ 233

OTH SHARE $

PE 1995 UNDERWAY
ROW 1997 $ 4456 CONST 1998 $ 3696
FED SHARE $ 2957 GA. SHARE $ 739 OTH SHARE $

PE 1997

$

25

ROW NONE $

0

CONST 1998

$

477

FED SHARE $ 382

GA. SHARE $

95

OTH SHARE $

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

15

FED SHARE $

12

GA. SHARE $

OTH SHARE $

3

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

15

FED SHARE $

12

GA. SHARE $

OTH SHARE $

3

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

15

FED SHARE $

12

GA. SHARE $

OTH SHARE $

3

~~j

~L:Z..o.:.~

m'fu::~

~..:::_:r

L:L.~ ...:J

(.~----'

L.~- _j

L:__ :cJ

1.::~~

__ -~- :;;;

l~ . . _:)

. J

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 41

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

HENRY SR 138 FM WALT STEPHENS RD/CLAYTON TO I-75 ... SEE CLAYTON CO

ATLANTA TIP# CL 031

PE NONE

$

0

72148X UNKNOWN / UNKNOWN

CQNG DIST. 0 & 0

ROW NONE

$

0

LENGTH(Miles/km): ,00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: J. GARLAND

FUND SOURCE: NAT'L HIGHWAY

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

721480 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 42

PROJECT LISTING BY RDC FY 1997IFY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ROCKDALE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

ATLANTA TIP # RO AR 201B

7V7022 TRANSIT PROJECTS I CAPITAL

CONG DIST. 4

FUNDS RECIPIENT: AGENCIES IN ROCKDALE COUNTY

CAPITAL 1997

$

30

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

24

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

ROCKDALE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 7V7028 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN ROCKDALE COUNTY
MANAGER: STEVE KISH
STATUS:

ATLANTA TIP # RO AR 201C

CONG DIST. 4

CAPITAL 1998

$

31

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

ROCKDALE PARKER RD FM CULPEPPER TO OAKLAND; FOR ADDL RW $; SEE 712640
71Y640 BRIDGES I NEW CONSTRUCTION
LENGTH(Mileslkm): .001.00000 MANAGER: BILL MOSKAL
STATUS:

ATLANTA TIP # RO 015A CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 712640 IS AN ASSOCIATED PROJECT.

PE LOCL
ROW 19.97 CONST NONE

$ 2000

$

0

ROCKDALE SR 201138 FROM RELOCATED SR 138 TO I-20 721580 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Mileslkm): 1.6012.57440
MANAGER: D. CHURCH STATUS: CO SGN UTIL 10189; CONYERS SGN P UTIL 2191

ATLANTA TIP # RO 035 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1995 UNDERWAY

CONST 1998

$ 4282

FED SHARE $ 3426

GA. SHARE $ 856

OTH SHARE $

ROCKDALE SR 20 FM SOUTH OF HONEY CREEK RD TO RELOC SR 138 & SIDEWALKS 730903 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Mileslkm): 2.8814.63392 MANAGER: D. CHURCH STATUS: CO SGN CT FOR PE & UTIL 9-27-94; CONST OF SIDEWALKS 10-95

ATLANTA TIP # RO 018 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 73Y903 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1997 $ 5000

CONST 1998

$ 2600

FED SHARE $ 2080

GA. SHARE $ 420

OTH SHARE $ 100

ROCKDALE EXTEND BR CLVT ON SR 20 @ ALMOND BRANCH 730905 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
LENGTH{Mileslkm): .011.01609 MANAGER: D. CHURCH STATUS: ROCKDALE SGN CONTRACT FOR PE & UTILITIES 9-27-94

ATLANTA TIP # RO 044 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1991 UNDERWAY

ROW NONE

$

0

CONST 1998 $ 257

FED SHARE $ 206

GA. SHARE $

51

OTH SHARE $

ROCKDALE S~ 20 @ BIG HAYNES CREEK NEAR WALTON CO LINE 730950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH{Mileslkm): .201.32180 MANAGER: D. GODWIN STATUS: ROCKDALE SIGNED 10-27-92 FOR UTILITIES.

ATLANTA TIP # RO 042 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1995 UNDERWAY

ROW 1997

$

27

CONST 1998 $ 1091

FED SHARE $ 873

GA. SHARE $ 218

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 43

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA---------R--EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C-O--M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-ST--S--

ROCKDALE SR 138/SR 20 FROM NORTH OF I-20 TO SIGMAN ROAD

ATLANTA TIP # RO 013B

PE 1993 UNDERWAY

731047 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

CONG DIST. 4

ROW 1997

$ 5789

LENGTH(Mi1es/km): 1.70/2.73530

CONST 1998

$ 5245

MANAGER: D. CHURCH

FUND SOURCE: NAT'L HIGHWAY

FED SHARE $ 4196

STATUS: REQ CITY DO ROW/UTIL 9/92; CO SGN UTIL/REFUSED ROW 3-1-93

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1049

731048 IS AN ASSOCIATED PROJECT.

OTH SHARE $

ROCKDALE SR 138/SR 20 BRIDGE OVER I-20
731048 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .27/.43443 MANAGER: D. CHURCH
STATUS: REQ CITY DO ROW/UTIL 9/92; CO SGN UTIL/REFUSED ROW 3-1-93

ATLANTA TIP # RO 013C CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 731047 IS AN ASSOCIATED PROJECT.

PE NONE

$

ROW NONE

$

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 4040 3232
808

ROCKDALE STANTON RD/CR 434 FM HONEY CREEK RD TO EBENEZER RD 742820 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.55/4.10295 MANAGER: D. GODWIN STATUS: CT REQ CO DOPE, ROW, UTIL & ALL CST OVER $1,148,000

2-9-94

ATLANTA TIP # RO 024C CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996

UNDERWAY

ROW LOCL

CONST 1997

$ 2800

FED SHARE $ 1148

GA. SHARE $

OTH SHARE $ 1652

ROCKDALE CR 1/0GLESBY BRIDGE RD. @ SOUTH RIVER .5 MI E OF HENRY CO LI 742880 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .25/.40225
MANAGER: D. GODWIN STATUS: CT SGN ROCKDALE DO PE, ROW, UTIL & DETOURS 3-26-96.

ATLANTA TIP # RO 055 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1997

$

5

ROW LOCL

CONST 1998

$

501

FED SHARE $

401

GA. SHARE $

100

OTH SHARE $

ROCKDALE SIGMAN RD/CR 435 FM I-20 TO IRWIN BRIDGE RD/CR 442 752190 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.52/4.05468 MANAGER: D. CHURCH STATUS: CO SGN CT DOPE, ROW, UTIL & ALL CST OVER $4,177,000/6-28-94

ATLANTA TIP # RO 014A CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$ 5221

FED SHARE $ 4177

GA. SHARE $

OTH SHARE $ 1044

ROCKDALE EBENEZER RD/CR 434 FM STANTON RD/CR 434 TO SMYRNA RD/CR 438
752330 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.90/3.05710 MANAGER: D. GODWIN
STATUS: CT REQ CO DOPE, ROW, UTIL & ALL CST OVER $887,000 2-9-94

ATLANTA TIP # RO 024BRTP CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997

$

ROW LOCL

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

5
1927 887
1040

ROCKDALE KLONDIKE RD/CR 437 FM SMYRNA RD/CR 438 TO JOHNSON SPUR 752390 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
LENGTH(Miles/km): .92/1.48028
MANAGER: BILL MOSKAL STATUS: ROCKDALE SGN CT DO PE,ROW,UTIL, ALL CST OVER 780,000 3-26-96

ATLANTA TIP # RO 017A CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996

UNDERWAY

ROW LOCL

CONST 1997

$ 3013

FED SHARE $ 780

GA. SHARE $

OTH SHARE $ 2233

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1997IFY 1999

Page 44

COUNTY

DESCRIPTION

ARC

FISCAL

COST

-P--. I-.-N--O-. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ROCKDALE HURST ROAD AT HONEY CREEK

ATLANTA TIP i RO 049

PE 1996 UNDERWAY

752400 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 4

ROW LOCL

LENGTH(Mileslkm): .40/.64360 MANAGER: D. GODWIN STATUS: ROCKDALE SGN CT. PE/ROW/UTIL & CONST OVER $293,000 5-24-94

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CONST 1997

$

674

FED SHARE $ 293

GA. SHARE $

OTH SHARE $

381

ROCKDALE ROCKBRIDGE RDICR 74 @ MAIN ST IN CONYERS 752420 INTERSECTION IMPROVEMENT I SAFETY
LENGTH(Miles/km): .38/.61142 - EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: D. GODWIN STATUS: CT SGN ROCKDALE PE/ROW/UTIL & CONST OVER $225,000 3-26-96.

ATLANTA TIP i RO 052 CONG DIST. 4 0 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

428

FED SHARE $ 225

GA. SHARE $

OTH SHARE $ 203

ROCKDALE SIDEWALKS ON MILSTEAD VILLAGE AND FLAT SHOALS RDS

ATLANTA TIP i ROAR 177AB

770934 SIDEWALKS I ENHANCEMENT

CONG DIST. 4

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT.IAIR QUAL

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

126

FED SHARE $ 101

GA. SHARE $

OTH SHARE $

25

ROCKDALE STANTON RD FM HONEY CREEK RD TO SR 138

ATLANTA TIP i ROAR 177D

770935 SIDEWALKS / ENHANCEMENT

CONG DIST. 4

LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT.IAIR QUAL

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1998

$

119

FED SHARE $

95

GA. SHARE $

OTH SHARE $

24

ROCKDALE SIDEWALKS ON UNDERWOOD ROAD

ATLANTA TIP i RO AR 177C

770937 SIDEWALKS / ENHANCEMENT

CONG DIST. 4

LENGTH(Miles/km): .001.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GODWIN

FUND SOURCE: CONG MIT.IAIR QUAL

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

26

FED SHARE $

21

GA. SHARE $

OTH SHARE $

5

ROCKDALE BIG HAYNES CREEK AREA MULTI-USE TRAIL

ATLANTA TIP i RO 056

770994 BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 4

LENGTH(Miles/km): 6.50/10.45850 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. CRANFORD

FUND SOURCE: TRANS. ENHANCE.

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1997 $ 500

FED SHARE $

400

GA. SHARE $

OTH SHARE $

100

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

CENTRAL SAVANNAH RIVER REGIONAL DEVELOPMENT CENTER
Burke Columbia Emanuel Glascock Hancock Jefferson Jenkins Johnson Lincoln McDuffie Richmond Screven Taliaferro Warren Washington
Wilkes

"'(")
)>
r
"z' 0
;;::
r=
"'(/)

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 45

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

CENTRAL SAVANNAH RIVER

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BURKE SR 56 FM S. BURKE CL NORTH;PART NEW LOC;TO N OF BENNOCK MILL 22118Z RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 0 & 0

PE NONE

$

0

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000 MANAGER: UNKNOWN

CONST NONE

$

0

FUND SOURCE: SURFACE TRANSPORT.

STATUS: SIGNED BURKE 6/86 AND RICHMOND 8/7/90 FOR UTILITIES.

FEDERAL HIGHWAY ADMIN FUNDS

221180 IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

CENTRAL SAVANNAH RIVER

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

COLUMBIA I-20 REST AREA #62 & 63

210565 REST AREA / RECST. OR REHAB.

CONG DIST. 10

LENGTH(Mi1es/km): .30/.48270- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: J. GARLAND

FUND SOURCE: I-STATE MAINT.

STATUS: COLUMBIA COUNTY SIGNED 6-15-93 FOR UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

COLUMBIA SR 104 FM MP 8.95 S OF CR 515 TO MP 11.95 S OF CR 80 221805 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Mi1es/km): 3.00/4.82700 MANAGER: B. FERGUSON STATUS: COLUMBIA COUNTY SGN FOR UTILITIES 5-19-92

AUGUSTA TIP # CC 076-1(21) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

COLUMBIA SR 28/FURYS FERRY RD FM RIVERWATCH PKWY/RICHMOND TO CR 98 221860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Mi1es/km): 2.88/4.63392 MANAGER: D. CHURCH STATUS: COLUMBIA SGN 3-17-92 UTIL; RICHMOND SGN 7-22-92 UTILITIES
COLUMBIA SR 47 NB MP 8.33-9.53;SB 13.48-15.18;NB 13.68-14.88 222140 ADDITION OF A PASSING LANE.
LENGTH(Mi1es/km): 4.18/6.72562 MANAGER: D. GRIFFITH STATUS:

AUGUSTA TIP # RCCC48-1(33) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 22186X IS AN ASSOCIATED PROJECT.
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 46

FISCAL YEAR

COST ESTS

PE NONE

$

ROW NONE $

CONST 1999 $

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 6820 6138
682

PE 1992 UNDERWAY

ROW 1998

$ 1337

CONST 1999

$ 6516

FED SHARE $ 5213

GA. SHARE $ 1303

OTH SHARE $

PE 1992 ROW 1998 CONST

UNDERWAY $ 2597 AFTER 99

PE 1998
ROW CONST

$

37

AFTER 99

AFTER 99

COLUMBIA CR 145 FM BASTON TO RIVERWATCH PK;BASTON FM SR 104 TO CR 145 250475 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
LENGTH(Mi1es/km): .57/.91713 MANAGER: D. CHURCH STATUS: COLUMBIA COUNTY SIGNED 3-3-92 FOR ROW AND UTILITIES.
COLUMBIA SR 104 FM CR 91/HALALI FARM RD TO E/CR 515 (INCL BRIDGES) 262080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Mi1es/km): 2.29/3.68461 MANAGER: B. FERGUSON STATUS: COLUMBIA COUNTY SIGNED FOR UTILITIES 11-19-91

AUGUSTA TIP # CC 7063(2) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
AUGUSTA TIP # CC 076-1(23) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1998 $ 3058

FED SHARE $ 2446

GA. SHARE $

612

OTH SHARE $

PE 1992 ROW 1998 CONST

UNDERWAY $ 1995 AFTER 99

COLUMBIA CR 136/BASTON RD FM CR 145 N TO SR 28/MARTINEZ 262410 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Mi1es/km): .27/.43443 MANAGER: D. CHURCH STATUS: COLUMBIA COUNTY SIGNED 3-3-92 FOR ROW AND UTILITIES.

AUGUSTA TIP # CC 7006(4) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1992

UNDERWAY

ROW LOCL

CONST 1998

$

661

FED SHARE $

529

GA. SHARE $ 132

OTH SHARE $

~:,__,

fi::,o'lc'.~~' '-:"}

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

CENTRAL SAVANNAH RIVER

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

COLUMBIA RESTORE HISTORIC HEADGATE BUILDING OF 271128 HISTORIC FACILITIES / ENHANCEMENT
LENGTH(Miles/km): .00/.00000- EXIST. MANAGER: CORA COOK STATUS: TO BE DONE BY CONTRACT

THE AUGUSTA CANAL LANES: 0 /PROPOSED

LANES:

AUGUSTA TIP # CC-OOOE(107) CONG DIST. 10 0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 47

FISCAL YEAR

COST ESTS

PE LOCL
ROW LOCL
CONST 1998 $ 754 FED SHARE $ 754 GA. SHARE $
OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

CENTRAL SAVANNAH RIVER

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

EMANUEL 222210
STATUS:

SR 26/SWAINSBORO @ SOUTHERN RR/REMOVE BR & CONST GRADE XING
BRIDGE REMOVAL / NEW CONSTRUCTION LENGTH(Miles/km): .56/.90104- EXIST. LANES: 2 /PROPOSED LANES:
MANAGER: D. GRIFFITH SWAINSBORO SGN UTIL 8-7-95;EMANUEL NO INVOLVED UTILITIES.

CONG DIST. 1 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

EMANUEL 231145
STATUS:

SR 171 @ OHOOPEE RIVER AND OVERFLOW NE/SOPERTON & TREUTLEN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .10/.16090 MANAGER: D. GRIFFITH SEE BRS-578(4), TREUTLEN COUNTY, PI *231140

EMANUEL 231960
STATUS:

SR 56 (3) BRIDGES OVER OGEECHEE RVR & OVFL NE OF SUMMERTOWN REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .74/1.19066 MANAGER: D. GRIFFITH COUNTY SGN DO UTIL 7-15-96;BURKE NO UTILITIES 8-5-96.

CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 23114X IS AN ASSOCIATED PROJECT.
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 48

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$ 1365

FED SHARE $ 1092

GA. SHARE $ 273

OTH SHARE $

PE 1995 UNDERWAY

ROW 1997

$

30

CONST 1998 $ 848

FED SHARE $

678

GA. SHARE $

170

OTH SHARE $

PE 1999 ROW CONST

$

86

AFTER 99

AFTER 99

EMANUEL 231970
STATUS:

SR 57 OVER SARDIS CREEK 9.7 MILES NW OF SWAINSBORO REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .23/.37007 MANAGER: D. GRIFFITH EMANUEL SGN DO UTILITIES 7/15/96.

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1998 ROW CONST

$

11

AFTER-99

AFTER 99

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 49

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

CENTRAL SAVANNAH RIVER

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

HANCOCK SR 15 OVER COPELAND CREEK

PE 1993 UNDERWAY

231310 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.

CONG DIST. 11

ROW 1996 UNDERWAY

LENGTH(Miles/km): .70/1.12630

CONST 1999

$

482

MANAGER: D. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 386

STATUS: NO REIMBURSABLE UTILITY COST ON THIS PROJECT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

96

OTH SHARE $

HANCOCK 231330
STATUS:

SR 15 OVER WHITTEN CREEK BRIDGES / RECST. OR REHAB.
LENGTH(Miles/km): .28/.45052 MANAGER: D. GRIFFITH HANCOCK REFUSED BUT THERE ARE NO UTILITIES INVOLVED

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1996 UNDERWAY

CONST 1999 $ 557

FED SHARE $

446

GA. SHARE $

111

OTH SHARE $

HANCOCK 270990
STATUS:

SHOULDERBONE INDIAN MOUND/HISTORICAL

RIGHTS-OF-WAY / ENHANCEMENT

CONG DIST. 11

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: C. VANDYKE

FUND SOURCE: TRANS. ENHANCE.

LGPA TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1997

$

800

CONST NONE

$

0

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 50

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

CENTRAL SAVANNAH RIVER

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

JEFFERSO SR 24/US 221 @ ROCKY COMFORT CREEK WEST SIDE OF LOUISVILLE

PE 1998

$

16

231980 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.

CONG DIST. 11

ROW

AFTER 99

LENGTH(Miles/km): .31/.49879

CONST

AFTER 99

MANAGER: D. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

STATUS: JEFFERSON REF DO UTIL 7/12/96;LOUISVILLE SGN DO UTIL 7/15/96

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

CENTRAL SAVANNAH RIVER

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

JOHNSON 222190
STATUS:

SR 15 AT 3 LOC BTWN WRIGHTSVILLE & TENNILLE/& WASHINGTON ADDITION OF A PASSING LANE. LENGTH(Miles/km): 4.14/6.66126 MANAGER: D. GRIFFITH

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 22219X IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 51

FISCAL YEAR

COST ESTS

PE 1999 ROW CONST

$

60

AFTER 99

AFTER 99

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999

20-Sep-1996 Page 52

COUNTY

DESCRIPTION

CENTRAL SAVANNAH RIVER

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

LINCOLN CR 262/WOODLAWN ROAD @ LLOYD CREEK 7 MI SW OF LINCOLNTON

PE 1994 UNDERWAY

242220 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 10

ROW LOCL

LENGTH(Miles/km): .20/.32180

CONST 1997

$

587

MANAGER: D. GRIFFITH STATUS: LINCOLN COUNTY SIGNED 11-2-93 FOR ROW, UTILITIES & DETOURS

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $

470

GA. SHARE $ 117

OTH SHARE $

LINCOLN 262450
STATUS:

CR 63/PETERSBURG RD FM SR 47 N TO SR 43 NEAR LINCOLNTON
RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. LENGTH(Miles/km): 1.80/2.89620 MANAGER: D. GRIFFITH LINCOLN SGN ROW, UTIL & DET 3/95;DOT AGREED TO PAY H20 7/96.

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 UNDERWAY ROW LOCL CONST 1997 $ 1520
FED SHARE $ 1216 GA. SHARE $ 304 OTH SHARE $

LINCOLN 271122
STATUS:

LAMAR BLANCHARD HOUSE IN LINCOLNTON

HISTORIC ACQUISITION / ENHANCEMENT

CONG DIST. 10

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: C. VANDYKE

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW 1997 $

81

CONST NONE

$

0

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 53

PROJECT LISTING BY RDC FY 1997IFY 1999

COUNTY

DESCRIPTION

CENTRAL SAVANNAH RIVER

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND RICHMOND COUNTY

2D2016 TRANSIT PROJECTS I OPERATIONS

CONG DIST. 10 & 11

FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS:

FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1997

$

FED SHARE $

GA. SHARE $

1850 313

OTH SHARE $ 1537

RICHMOND CAPITAL MAINT., TOOLS & EQUIP., SOFTWARE, TIRE LEASE, ETC 2D2017 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:

CONG DIST. 10 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$ 165

FED SHARE $ 132

GA. SHARE $

17

OTH SHARE $

17

RICHMOND TRANSIT & ADA VEHICLES, CAP. MAINT., AND MISC. CAPITAL EQUIP 2D2018 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:

CONG DIST. 10 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1789 1431
179 179

RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND RICHMOND COUNTY 2D2019 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS:

CONG DIST. 10 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

2110 157
1953

RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND RICHMOND COUNTIES 2D2020 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT
MANAGER: STEVE KISH
STATUS:

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1999

$

FED SHARE $

GA. SHARE $

OTH SHARE $

2396 157
2239

RICHMOND ADMIN. VEHICLES, CAP . MAINT . , AND MISC. CAP. EQUIPMENT
2D2021 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT
MANAGER: STEVE KISH
STATUS:

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1999

$ 139

FED SHARE $

111

GA. SHARE $

14

OTH SHARE $

14

RICHMOND ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
2V7021 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA MPO AREA MANAGER: STEVE KISH STATUS:

CONG DIST. 10 & 11

CAPITAL 1997

$

50

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

40

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

5

OTH SHARE $

5

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 54

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

CENTRAL SAVANNAH RIVER

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
RICHMOND ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

2V7022 TRANSIT PROJECTS / CAPITAL

CONG DIST. 10 & 11

FUNDS RECIPIENT: AGENCIES IN RICHMOND MPO AREA

CAPITAL 1998

$

52

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

42

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

5

OTH SHARE $

5

RICHMOND ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 2V7023 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA MPO AREA MANAGER: STEVE KISH
STATUS:

CONG DIST. 10 & 11

CAPITAL 1999-

$

56

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

45

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

5

OTH SHARE $

6

RICHMOND I-20 @ SAVANNAH RIVER
210327 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .50/.80450 MANAGER: D. CHURCH
STATUS: LGPA NOT APPLICABLE

AUGUSTA TIP# RC 20-2(117) CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW NONE CONST

$

50

$

0

AFTER 99

RICHMOND I-520 FM NORTH OF I-20 TO SR 4/US 1--SLAB REPAIR & OVERLAY

AUGUSTA TIP # RC 520-1(11)

210360 RESURFACE & MAINTENANCE / MAINTENANCE

CONG DIST. 10 & 11

LENGTH(Miles/km): 5.99/9.63791 - EXIST. LANES: 4 /PROPOSED LANES: 4

MANAGER: M. GANNAWAY

FUND SOURCE: I-STATE MAINT.

STATUS: LGPA NOT APPLICABLE THIS PROJECT

FEDERAL HIGHWAY ADMIN FUNDS

210430 IS AN ASSOCIATED PROJECT.

RICHMOND I-520 FM WRIGHTSBORO RD TO GORDON HWY--WIDENING TO 6 LANES 210430 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): 1.28/2.05952
MANAGER: M. GANNAWAY STATUS: RICHMOND SGN DO UTILITIES 4-16-96.

AUGUSTA TIP# RC 520-1(13) CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 210360 IS AN ASSOCIATED PROJECT.

RICHMOND I~520 FM NORTH OF I-20 TO WRIGHTSBORO RD WIDENING TO 6-LANES
210440 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 2.64/4.24776 MANAGER: M. GANNAWAY
STATUS: RICHMOND COUNTY SIGNED FOR UTILITIES 2-1-94.

AUGUSTA TIP # RC 520-1(14) CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 21Y440 IS AN ASSOCIATED PROJECT.

RICHMOND I-520 FM WHEELER RD NORTH TO I-20 & INTERCHANGE/21Y450 210450 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): .76/1.22284
MANAGER: M. GANNAWAY
STATUS:

AUGUSTA TIP# RC 520-1(15) CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 21Y450 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1993

UNDERWAY

ROW NONE $

0

CONST 1997

$ 3366

FED SHARE $ 3029

GA. SHARE $ 337

OTH SHARE $

PE 1994 UNDERWAY ROW 1996 UNDERWAY CONST 1997 $ 2246
FED SHARE $ 1797 GA. SHARE $ 449 OTH SHARE $

PE 1994 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$ 2417

FED SHARE $ 1934

GA. SHARE $ 483

OTH SHARE $

PE 1994 ROW 1999 CONST

UNDERWAY $ 1000 AFTER 99

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

CENTRAL SAVANNAH RIVER

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

RICHMOND I-20 FM I-520 TO THE SAVANNAH RIVER BRIDGE/21Y570 210570 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): 5.25/8.44725 MANAGER: D. CHURCH
STATUS:

AUGUSTA TIP # RC 20-2(145) CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 21Y570 IS AN ASSOCIATED PROJECT.

RICHMOND 210760
STATUS:

I-20 AUGUSTA WELCOME CENTER REST AREA j RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: J. GARLAND CO SGN FOR UTIL 2-6-96; INDUSTRY & TRADE TO FUND 20%.

LANES:

AUGUSTA TIP# RCI20-2(161) CONG DIST. 10 0 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

RICHMOND I-520 FM WRIGHTSBORO RD TO GORDON HWY- FOR IM; SEE 210430

AUGUSTA TIP # RC 520-1(13)

21Y430 UNKNOWN / RECST. OR REHAB.

CONG DIST. 10

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: M. GANNAWAY

FUND SOURCE: I-STATE MAINT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

RICHMOND I-520 FM NORTH OF I-20 TO WRIGHTSBORO RD; FOR IM; SEE 210440
21Y440 UNKNOWN / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: M. GANNAWAY
STATUS:

AUGUSTA TIP# RC 520-1(14)
CONG DIST. 10 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 210440 IS AN ASSOCIATED PROJECT.

RICHMOND BQBBY JONES XWY FM LANEY WALKER BLVD TO SAVANNAH RIVER 220105 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
LENGTH(Miles/km): .89/1.43201 MANAGER: D. SMITH STATUS: HOLDING FOR SPECIAL FUNDS FOR CONSTRUCTION

AUGUSTA TIP# RC 117-1(13) CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

RICHMOND BOBBY JONES EXPRESSWAY BRIDGE OVER THE SAVANNAH RIVER TO SC
220107 BRIDGES / NEW CONSTRUCTION LENGTH(Miles/km): .00/.00000 MANAGER: D. SMITH
STATUS: LOCL SHARE IS SC; SC TO INITIATE BI-STATE AGRMT

AUGUSTA TIP# RC 117-1(14) CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

RICHMOND SR 4/15TH ST/AUGUSTA FM MILLEDGEVILLE RD TO GOVERNMENT ST 220680 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): .85/1.36765 MANAGER: BILL MOSKAL STATUS: CO SGN 12-6-88. DOT DO ALL ROW.

AUGUSTA TIP# RC 038-2(18) CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 55

FISCAL YEAR

COST ESTS

PE 1999 ROW NONE CONST

$ 842

$

0

AFTER 99

PE 1995 UNDERWAY

ROW 1997

$ 1572

CONST 1997

$ 7860

FED SHARE $ 6288

GA. SHARE $

OTH SHARE $ 1572

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 1061 955 106

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 3086 2777 309

PE 1995 UNDERWAY

ROW 1991 UNDERWAY

CONST 1999

$ 8275

FED SHARE $ 6620

GA. SHARE $ 1655

OTH SHARE $

PE 1995 UNDERWAY

ROW NONE

$

0

CONST 1999

$ 15570

FED SHARE $ 7785

GA. SHARE $

OTH SHARE $ 7785

PE 1992 UNDERWAY

ROW 1997

$

735

CONST 1999

$ 3263

FED SHARE $ 2610

GA. SHARE $

653

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

CENTRAL SAVANNAH RIVER

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

RICHMOND SR 10/GORDON HWY FM SR 223 TO W/FORT GORDON GATE #1/&CLVT 221532 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.50/5.63150 MANAGER: BILL MOSKAL STATUS: RICHMOND SIGNED FOR UTILITIES 4-7-92

AUGUSTA TIP # RC 004-3(35) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 56

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1994 UNDERWAY

CONST 1999

$ 5772

FED SHARE $ 4618

GA. SHARE $ 1154

OTH SHARE $

RICHMOND SR 4/DEANS BR RD FM S FT GORDON GATE 5 TO MP 20.75

AUGUSTA TIP # RC 043-1(49)

221550 TURN LANES / RECST. OR REHAB.

CONG DIST. 11 & 10

LENGTH(Miles/km): 6.29/10.12061 - EXIST. LANES: 6 /PROPOSED LANES: 6

MANAGER: D. GRIFFITH

FUND SOURCE: NAT'L HIGHWAY

STATUS: RICHMOND SIGNED TO DO UTILITIES 12-20-94

FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1997

$

45

CONST 1998 $ 1519

FED SHARE $ 1215

GA. SHARE $ 304

OTH SHARE $

RICHMOND SR 28/FURYS FERRY RD FM RIVERWATCH PK TO CR 98/SEE COLUMBIA

AUGUSTA TIP # RCCC48-1(33)

PE NONE

$

0

22186X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: D. CHURCH

FUND SOURCE: SURFACE TRANSPORT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

221860 IS AN ASSOCIATED PROJECT.

RICHMOND I-520/SR 415 @ SR 56 ADD WB LOOP

AUGUSTA TIP# RC 520-1(16)

222350 RAMP / NEW CONSTRUCTION

CONG DIST. 10 & 11

LENGTH(Miles/km): 1.69/2.71921- EXIST. LANES: 4 /PROPOSED LANES: 5

MANAGER: D. CHURCH

FUND SOURCE: I-STATE MAINT.

STATUS: RICHMOND COUNTY SIGNED FOR UTILITIES 12-15-92

FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1997

$ 4200

CONST 1999 $ 6279

FED SHARE $ 5651

GA. SHARE $ 628

OTH SHARE $

RICHMOND TOBACCO RD @ SR 4/US 1 IN AUGUSTA

AUGUSTA TIP # RC 043-1(52)

222370 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 10 & 11

LENGTH(Miles/km): 1.36/2.18824 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: D. CHURCH

FUND SOURCE: NAT'L HIGHWAY

STATUS: RICHMOND SGN DO UTILITIES 3-5-96.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1997

$ 2010

CONST 1998 $ 4500

FED SHARE $ 3600

GA. SHARE $

900

OTH SHARE $

RICHMOND CSX RAILROAD AT OLIVE RD IN AUGUSTA
240809 BRIDGES / SAFETY LENGTH(Miles/km): .47/.75623 MANAGER: D. CHURCH
STATUS: CITY SGN 5/91 ROW/UTIL (CITY UTIL NEGLIGIBLE).

AUGUSTA TIP # RC 9104(001) CONG DIST. 11 & 10
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 24Y809 IS AN ASSOCIATED PROJECT.

PE 1991 UNDERWAY

ROW LOCL

CONST 1997

$ 3219

FED SHARE $ 2575

GA. SHARE $ 644

OTH SHARE $

RICHMOND SHOWN FOR "RR DEMO" MONEY ONLY ... SEE 240809 FOR PROJECT INFO
24Y809 UNKNOWN / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: D. CHURCH
STATUS: LGPA NOT APPLICABLE

AUGUSTA TIP# RC 9104(001) CONG DIST. 11 & 10 0 FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 240809 IS AN ASSOCIATED PROJECT.

PE NONE $

ROW LOCL

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
2306 2191
115

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 57

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

CENTRAL SAVANNAH RIVER

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

RICHMOND CR 200/WHEELESS RD @ ROCKY CREEK JUST S/MILLEDGEVILLE RD

AUGUSTA TIP # RC 7000(5)

PE 1994

UNDERWAY

250490 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 11 & 10

ROW LOCL

LENGTH(Miles/km): .15/.24135
MANAGER: D. GRIFFITH STATUS: RICHMOND SGN 4-7-92 ROW & UTIL.

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CONST 1998

$

806

FED SHARE $

645

GA. SHARE $

161

OTH SHARE $

RICHMOND WRIGHTSBORO RD/CR 1501 FM BELAIR RD TO BARTON CHAPEL RD 250510 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.63/4.23167 MANAGER: D. CHURCH
STATUS:

AUGUSTA TIP # RC 7001(9) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW LOCL CONST

$

150

AFTER 99

RICHMOND NORTH LEG ROAD OVER CSX RAILROAD 250570 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): .00/.00000 MANAGER: D. CHURCH STATUS: RICHMOND SGN DO ROW, UTIL & DET 4-16-96.

AUGUSTA TIP # RC 7006(7) CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

15

AFTER 99

RICHMOND AUGUSTA CANAL MULTI-USE TRAIL/COLUMBIA

AUGUSTA TIP # RC-000-E(96)

271120 BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 10 & 11

LENGTH(Miles/km): 10.00/16.09000 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: CORA COOK

FUND SOURCE: TRANS. ENHANCE.

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW LOCL

CONST 1997

$

625

FED SHARE $

500

GA. SHARE $

OTH SHARE $

125

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 58

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

CENTRAL SAVANNAH RIVER

FISCAL

COST

-P--.I-.-N-O--. ----------------P-R-O-JE-C--T--D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

SCREVEN SR 21 W/SYLVANIA @ OGEECHEE CREEK

PE 1992 UNDERWAY

221328 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.

CONG DIST. 11

ROW NONE $

0

LENGTH(Miles/km): .03/.04827 MANAGER: K. FULBRIGHT

FUND SOUR'CE: BRIDGE PROGRAM

CONST 1998 $ 521

FED SHARE $

417

STATUS: COUNTY SIGNED 12/15/87 FOR UTILITIES ONLY

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 104

OTH SHARE $

SCREVEN 221329
STATUS:

SR 21 W/SYLVANIA @ HORSE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .03/.04827 MANAGER: K. FULBRIGHT COUNTY SIGNED 12/15/87 FOR UTILITIES ONLY; SEE 221328

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1998 $ 833

FED SHARE $

666

GA. SHARE $

167

OTH SHARE $

SCREVEN 53263X
STATUS:

S~ 73/US 301 N OF STATESBORO FM CR 445 TO SR 17/BULLOCH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.93/3.10537
MANAGER: K. FULBRIGHT

CONG DIST. 0 & 0

PE NONE

$

0

ROW NONE $

0

FUND SOURCE: NAT'L HIGHWAY

CONST NONE

$

0

FEDERAL HIGHWAY ADMIN FUNDS

532630 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

~

'-..c::~--.::---_;

C:';'~::..,_ 2"~

-.~:"':.~'::::-:::'

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1997/FY 1999

Page 59

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

CENTRAL SAVANNAH RIVER REGIONAL DEVELOPMENT COMMISSION

COMMENTS

FISCAL YEAR

COST ESTS

----------------------------------------------------------------------------------------------------------------------~------------

WARREN SR 16 OVER GOLDENS CREEK IN WARRENTON & TURN LANES (22Y390)

PE 1994 UNDERWAY

222390 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 11

ROW 1997

$

5

LENGTH(Miles/km): .62/.99758

CONST 1998 $ 520

MANAGER: D. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

416

STATUS: WARREN REFUSED P UTIL 8-4-96;WARRENTON REFUSED UTIL 10-27-95

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 104

22Y390 IS AN ASSOCIATED PROJECT.

OTH SHARE $

WARREN 22Y390
STATUS:

SR 16 OVER GOLDENS CREEK - 33E $ FOR TURN LANES - SEE 222390 BRIDGES / REPLACEMENT LENGTH(Miles/km): .00/.00000 MANAGER: UNKNOWN

PE NONE

$

0

CONG DIST. 11

ROW NONE $

0

CONST 1998

$

214

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 171

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

43

222390 IS AN ASSOCIATED PROJECT.

OTH SHARE $

WARREN 271124
STATUS:

CITY OF WARRENTON GYMNASIUM AUDITORIUM

HISTORIC PRESERVATION / ENHANCEMENT

CONG DIST. 11

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: C. VANDYKE

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1997

$

100

FED SHARE $

80

GA. SHARE $

OTH SHARE $

20

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 60

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

CENTRAL SAVANNAH RIVER

FISCAL

COST

-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

WASHINGT SR 15@ 3 LOC BTWN WRIGHTSVILLE & TENNILLE ... SEE JOHNSON CO

PE NONE $

0

22219X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE $

0

MANAGER: UNKNOWN

FUND SOURCE: SURFACE TRANSPORT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

222190 IS AN ASSOCIATED PROJECT.

WASHINGT SR 24 BET SANDERS'LE & DAVISBORO EB MP 14.3-13.4;WB 5.3-7.0
231240 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.60/4.18340 MANAGER: D. GRIFFITH
STATUS:

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW CONST

$

45

AFTER 99

AFTER 99

WASHINGT SR 24 OVER WILLIAMSON SWAMP CREEK 1.3 MILES NW OF DAVISBORO
245140 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225 MANAGER: D. GRIFFITH
STATUS: WASHINGTON & DAVISBORO HAS NO INVOLVED UTILITIES.

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW CONST

$

14

AFTER 99

AFTER 99

WASHINGT JORDAN MILL RD ON NEW LOC FM TANLEY TO HOSPITAL RD & SR 24

250590 INTERSECTION IMPROVEMENT / RECST. OR REHAB.

CONG DIST. 11

LENGTH(Miles/km): .10/.16090- EXIST. LANES: 0 /PROPOSED LANES: 2

MANAGER: D. GRIFFITH

FUND SOURCE: SURFACE TRANSPORT.

STATUS: SANDERSVILLE SGN ROW, UTIL & OTHER 8/20/96;CO NO UTIL !NV.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1997
ROW LOCL CONST

$

15

AFTER 99

WASHINGT CITY OF TENNILLE RAILROAD DEPOT MUSEUM

271126 HISTORIC FACILITIES / ENHANCEMENT

CONG DIST. 11

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: C. VANDYKE

FUND SOURCE: TRANS. ENHANCE.

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW LOCL

CONST 1997

$

137

FED SHARE $

110

GA. SHARE $

OTH SHARE $

27

'f.
CHATTAHOOCHEE FLINT REGIONAL DEVELOPMENT CENTER
Carroll Coweta Heard Meriwether Troup

"C

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

20-Sep-1996 Page 61

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

CHATTAHOOCHEE-FLINT

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CARROLL 61091X

I-20 SAFETY IMPROVEMENTS FRM ALA STATE LINE TO SR 61/HARALSO

UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: I-STATE MAINT.

PE NONE

$

0

ROW NONE $

0

CONST NONE $

0

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

610910 IS AN ASSOCIATED PROJECT.

CARROLL 621970
STATUS:

SR 16/166 @ CR 521/BLANDENBURG RD IN CARROLLTON

INTERSECTION IMPROVEMENT / SAFETY

LENGTH(Miles/km): .54/.86886- EXIST. LANES: 4 /PROPOSED LANES:

MANAGER: GREG PARKER

CARROLLTON SGN FOR ROW AND UTILITIES 10-24-95

OTO

CONG DIST. 7 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 $

10

ROW LOCL

CONST 1999 $ 194

FED SHARE $ 194

GA. SHARE $

OTH SHARE $

CARROLL 631320
STATUS:

SR 16/US 27ALT FM SR 166 SE TO W OF STRIPLING CHAP RD/CR 24 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.65/2.65485 MANAGER: M. REYNOLDS CITY SGN PUBLIC UTIL 11-2-92; COUNTY HAS NO UTIL

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1999 CONST

UNDERWAY $ 1761 AFTER 99

CARROLL 641890
STATUS:

N CARROLLTON BYP/SR 166 CONN. FM SR 1 TO SR 166 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.90/4.66610 MANAGER: M. REYNOLDS
COUNTY REFUSED 3-2-94; CARROLLTON REFUSED 10-19-92

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1997 CONST

UNDERWAY
$ 2793 AFTER 99

CARROLL 642080
STATUS:

CR 834/SMITHFIELD ROAD @ INDIAN CREEK 4 MI NORTH OF BOWDON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225 MANAGER: GREG PARKER CARROLL SGN DO ROW, UTILITIES & DETOURS 11-6-95

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CARROLL 642085
STATUS:

CR 834/SMITHFIELD ROAD @ TURKEY CREEK 3.5 MI NORTH OF BOWDON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: GREG PARKER CARROLL SGN DO ROW, UTILITIES & DETOURS 11-6-95

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CARROLL 642090
STATUS:

CR 523/JONES MILL ROAD @ SNAKE CREEK 1.5 MI N OF WHITESBURG REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .31/.49879
MANAGER: GREG PARKER CARROLL SGN DO ROW, UTILITIES & DETOURS 11-6-95

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW LOCL

CONST 1999 $ 367

FED SHARE $ 294

GA. SHARE $

73

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1999

$

549

FED SHARE $ 439

GA. SHARE $ 110

OTH SHARE $

PE 19.96 UNDERWAY

ROW LOCL

CONST 1999

$

638

FED SHARE $ 510

GA. SHARE $ 128

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 62

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

CHATTAHOOCHEE-FLINT

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-ST--S--

CARROLL SR 8/US 78 AT CS 777

PE 1994 UNDERWAY

650480 TURN LANES / SAFETY

CONG DIST. 7

ROW LOCL

LENGTH(Miles/km): .60/.96540- EXIST. LANES: 2 /PROPOSED LANES: 3

CONST 1998 $ 265

MANAGER: GREG PARKER

FUND SOURCE: HWY. SAFETY

FED SHARE $ 239

STATUS: REVISED REQ VILLA RICA DO ROW & UTIL 2-17-94

OTO

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

27

OTH SHARE $

CARROLL 650570
STATUS:

CS 824/STEWART ST/CARROLLTON @ CURTIS CREEK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .32/.51488 MANAGER: GREG PARKER CARROLLTON PREV SGN 3-20-92 ROW & UTIL BUT REQ DELAY 6-9-92

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1991 UNDERWAY

ROW LOCL

CONST 1998 $ 333

FED SHARE $ 266

GA. SHARE $

67

OTH SHARE $

CARROLL 662500
STATUS:

CR 217/PLOWSHARE RD @ BUCK CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225 MANAGER: GREG PARKER CARROLL SGN ROW & UTIL 11/90;CARROLLTON NO INVOLVED UTIL.

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY
ROW LOCL CONST 1998 $ 930
FED SHARE $ 744 GA. SHARE $ 186 OTH SHARE $

CARROLL 671020
STATUS:

CR 813/STATE LINE RD @ BIG INDIAN CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .30/.48270 MANAGER: GREG PARKER CARROLL SIGNED 12/22/89 FOR ROW, UTILITIES & DETOURS.

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1990 UNDERWAY ROW LOCL CONST 1997 $ 622
FED SHARE $ 498 GA. SHARE $ 124 OTH SHARE $

CARROLL 671040
STATUS:

CR 394/HICKORY LEVEL-SAND HILL RD @ HOMINY CK SW/VILLA RICA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .37/.59533 MANAGER: GREG PARKER CARROLL SGN FOR ROW, UTILITIES & DETOURS 11-20-95

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

336

FED SHARE $ 269

GA. SHARE $

67

OTH SHARE $

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 63

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

CHATTAHOOCHEE-FLINT

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-ST-S---

COWETA I-85/SR 34 RAMP RECONSTRUCTION SOUTHEAST QUADRANT

PE 1996 UNDERWAY

311790 RAMP / RECST. OR REHAB.

CONG DIST. 3

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

ROW 1998 CONST

$ 3039 AFTER 99

MANAGER: M. REYNOLDS

FUND SOURCE: I-STATE MAINT.

STATUS: NEWNAN SGN UTILITIES 4-23-96;REQ COWETA DO P UTIL 5-2-96.

FEDERAL HIGHWAY ADMIN FUNDS

COWETA 331740
STATUS:

CR 301/SHADY GROVE CH. RD @WAHOO CREEK 5,8 MI NW OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COWETA 332170
STATUS:

SR 14/US 29 AT SR 154

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 3

LENGTH(Miles/km): .32/.51488- EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

CO REF ROW & UTIL 2-21-96.

OTO

FEDERAL HIGHWAY ADMIN FUNDS

COWETA 332180
STATUS:

SR 16 AT SR 54 INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): ,25/.40225- EXIST, LANES: 2 /PROPOSED LANES: MANAGER: GORDON BROWN COWETA SGN UTIL, SIGNALS & PART ROW 3\95;TURIN NO INV UTIL

CONG DIST. 3 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

COWETA 342900
STATUS:

CR 251/WAGERS MILL ROAD@ WAHOO CREEK 7.6 MI NW OF NEWNAN
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COWETA 342945
STATUS:

CR 549/WELCOME ROAD @ MOUNTAIN CREEK 3.1 MI NW OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .25/.40225 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COWETA 342950
STATUS:

CR 555/W. GRANTVILLE ROAD @ NEW RIVER 3 MI N OF JCT SR 14 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225
MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 342955 IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1995 UNDERWAY

ROW LOCL

CONST 1997

$

311

FED SHARE $ 249

GA. SHARE $

62

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

190

FED SHARE $

171

GA. SHARE $

19

OTH SHARE $

PE 1997

$

5

ROW LOCL

CONST 1997

$

135

FED SHARE $

135

GA. SHARE $

OTH SHARE $

PE 1995 UNDERWAY

ROW LOCL

CONST 1997

$

390

FED SHARE $ 312

GA . .SHARE $

78

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1997

$

158

FED SHARE $ 126

GA. SHARE $

32

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1997

$

233

FED SHARE $

186

GA. SHARE $

47

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 64

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

CHATTAHOOCHEE-FLINT

FISCAL

COST

-P--. I-.-N--O-. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COWETA CR 555/W. GRANTVILLE ROAD @ GOLDEN CK 4.9 MI N OF JCT SR 14

PE 1996 UNDERWAY

342955 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 3

ROW LOCL

LENGTH(Miles/km): .25/.40225

CONST 1997 $ 232

MANAGER: J. LEONI STATUS: COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 186

GA. SHARE $

46

342950 IS AN ASSOCIATED PROJECT.

OTH SHARE $

COWETA 342960
STATUS:

CR 317/HENRY BRYANT ROAD @ WAHOO CREEK 3.5 MI NW OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY ROW LOCL CONST 1997 $ 559
FED SHARE $ 447 GA. SHARE $ 112 OTH SHARE $

COWETA 350980
STATUS:

SR 34 AT FIVE EXISTING MEDIAN OPENINGS

TURN LANES / SAFETY

CONG DIST. 3

LENGTH(Miles/km): .50/.80450- EXIST. LANES: 4 /PROPOSED LANES: 5

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

NEWNAN SGN DO UTIL 3-22-94;COWETA NO INVOLVED UTILITIES.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1998 $ 330

FED SHARE $ 297

GA. SHARE $

33

OTH SHARE $

COWETA 370781
STATUS:

CR 157/ROCKAWAY RD IN SENOIA @ CSX RR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .27/.43443 MANAGER: GORDON BROWN CITY OF SENOIA SIGNED 1-31-90 FOR ROW, UTIL & DETOURS.

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1997 $ 1212 FED SHARE $ 970
GA. SHARE $ 242 OTH SHARE $

COWETA 370824
STATUS:

CR 74/STALLINGS ROAD @ KEG CREEK TRIB. 1 MI N OF SENOIA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .19/.30571 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 370826 IS AN ASSOCIATED PROJECT.

PE 1995 UNDERWAY

ROW LOCL

CONST 1997 $ 244

FED SHARE $ 195

GA. SHARE $

49

OTH SHARE $

COWETA 370826
STATUS:

CR 74/STALLINGS ROAD @ KEG CREEK 1.5 MI N OF SENOIA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND .SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 370824 IS AN ASSOCIATED PROJECT.

PE 1995 UNDERWAY

ROW LOCL

CONST 1997 $ 267

FED SHARE $ 214

GA. SHARE $

53

OTH SHARE $

COWETA 371302
STATUS:

CR 82/GOODWYN ROAD @ WHITE OAK CREEK 3 MI E OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .22/.35398 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 UNDERWAY

ROW LOCL

CONST 1997 $ 364

FED SHARE $ 291

GA. SHARE $

73

OTH SHARE $

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P. I . NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

CHATTAHOOCHEE-FLINT

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

COWETA 371306
STATUS:

CR 21/HAPPY VALLEY ROAD @ BROWNS CREEK 6 MI N OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Mi1es/km): .20/.32180 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COWETA 371308
STATUS:

CR 239/BOHANNON ROAD @ NEW RIVER 1 MI N OF GRANTVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COWETA 371330
STATUS:

CR 252/SMOKEY RD OVER MOUNTAIN CREEK SW OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225
MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 65

FISCAL YEAR

COST ESTS

PE 1995 UNDERWAY

ROW LOCL

CONST 1997

$

202

FED SHARE $ 162

GA. SHARE $

40

OTH SHARE $

PE 1995 UNDERWAY

ROW LOCL

CONST 1997 $ 301

FED SHARE $ 241

GA. SHARE $

60

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

366

FED SHARE $

293

GA. SHARE $

73

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 66

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

CHATTAHOOCHEE-FLINT

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

TROUP SR 1 @ UNNAMED TRIBUTARY TO WEST POINT LAKE

PE 1992 UNDERWAY

321720 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.

CONG DIST. 7

ROW NONE $

0

LENGTH(Miles/km): .30/.48270

CONST 1999

$

920

MANAGER: M. GANNAWAY STATUS: COUNTY SIGNED 11-17-87 FOR UTILITIES

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 736 GA. SHARE $ 184

OTH SHARE $

TROUP 322250
STATUS:

SR 1/US 27/LAGRANGE FM AUBURN ST TO SR 219/MORGAN ST RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH{Miles/km): 1.42/2.28478 MANAGER: J. GARLAND LAGRANGE SGN UTILITIES 3-4-92;TROUP NO INVOLVED UTLITIES.

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1998 CONST

UNDERWAY $ 10608 AFTER 99

TROUP 350990
STATUS:

SOUTH LOOP FROM FLING RD SE TO PEGASUS PARKWAY IN LAGRANGE CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
LENGTH{Miles/km): 3.25/5.22925 MANAGER: J. GARLAND TROUP SGN FOR RUO 9-13-96;REQ LAGRANGE DO RUD 7-12-96.

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

45

AFTER 99

TROUP 351170
STATUS:

SR 14/US 29 LEFT TURN LANE FROM MEADOW WAY DR TO SR 14 SPUR

TURN LANES / SAFETY

CONG DIST. 7

LENGTH{Miles/km): .63/1.01367 - EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1999 ROW LOCL CONST

$

24

AFTER 99

COASTAL GEORGIA REGIONAL DEVELOPMENT CENTER
Bryan Bulloch Camden Chatham Effingham Glynn Liberty
Long Mcintosh

Iirl&~
STEWART MILITARY RESERVATION
U.S.A

T PULASKI NATIONAL MONUMENT WAY ISLAND
"'-'-=~-~ Sound
WASSAW NATIONAL WILDLIFE REFUGE
WASSAW ISLAND

Harrietts Bluft

ST. CATHERINE$ ISLAND ~~.r--\1----+ HARRIS NECK NATIONAL
WILDLIFE REFUGE
BLACKBEARD ISLAND NATIONAL WILDLIFE REFUGE BLACKBEARD ISLAND
WILDERNESS AREA
SAPELO ISLAND NAT'L. ESTUARINE SANCTUARY
Doboy Sound
WOLF ISLAND NATIONAL WILDLIFE REFUGE
AND WILDERNESS AREA
LITTLE SAINT SIMONS ISLAND NATIONAL MONUMENT
ISLAND
JEKYLL ISLAND PARK

CUMBERLAND ISLAND
r'IIAADtDI Alun ,,.., ... , ...

COASTAL GEORGIA

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 67

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BRYAN

I-95 FM JERICO RVR TO US 17 ... SEE LIBERTY CO- 511150

PE NONE

$

0

51115X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: UNKNOWN

FUND SOURCE: NAT'L HIGHWAY

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

511150 IS AN ASSOCIATED PROJECT.

BRYAN 511190
STATUS:

I-16 WIDEN 10 BRIDGES @ MP 138.3; 145.9; 146.6; 146.8; 147.2 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): 10.00/16.09000 MANAGER: KEVIN HOSEY REQ BRYAN DO UTILITIES 10-5-93

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 51119X IS AN ASSOCIATED PROJECT.

PE 1994 UNDERWAY

ROW NOl-JE $

0

CONST 1999

$ 6150

FED SHARE $ 5535

GA. SHARE $ 615

OTH SHARE $

BRYAN 511325
STATUS:

I-95 FOG DETECTION SYS IN BYRAN,CHATHAM,EFFINGHAM;511325,X;Z

MISCELLANEOUS IMPROVEMENTS / NEW CONSTRUCTION

CONG DIST. 1

LENGTH(Miles/km): 8.30/13.35470 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: I-STATE MAINT.

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

51132X IS AN ASSOCIATED PROJECT.

PE 1997 $ ROW NONE $ CONST 1997 $
FED SHARE $ GA. SHARE $ OTH SHARE $

50 0
1500 1350
150

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 68

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BULLOCH SR 67 FM CR 248/585 NORTH TO 5-LN SECTION

PE 1992 UNDERWAY

521270 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 1

ROW 1997

$

150

LENGTH(Miles/km): 1.40/2.25260

CONST 1999 $ 1675

MANAGER: TONY COLLINS STATUS: STATESBORO SGN 6-4-91 & COUNTY SGN 6-5-91 FOR UTILITIES

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

FED -SHARE $ 1340 GA. SHARE $ 335

OTH SHARE $

BULLOCH 521275
STATUS:

SR 67 @ LITTLE LOTTS CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS BULLOCH COUNTY SIGNED 6/14/90 FOR UTILITIES.

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1999

$

718

FED SHARE $ 574

GA. SHARE $

144

OTH SHARE $

BULLOCH 521800
STATUS:

SR 73/US 301 FM PACKING HOUSE RD TO NORTH OF CR 445 & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.45/7.16005
MANAGER: RAY METTS REQ BULLOCH DO UTILITIES 6-6-96.

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1998
CONST

UNDERWAY $ 3386 AFTER 99

BULLOCH 521970
STATUS:

SR 26/STATESBORO FM BRANNEN RD/CS 802 TO SR 67/73/US 301 RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES.
LENGTH(Miles/km): 1.87/3.00883 MANAGER: RAY METTS CO SGN PUB UTIL 12-17-91;STATESBORO DO UTILITIES 12-2-91

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1998 CONST

UNDERWAY
$ 404 AFTER 99

BULLOCH 522470
STATUS:

SR 26/US 80 EB MP 7.1-8.2; WB MP 8.1-9.3 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.30/3.70070 MANAGER: TONY COLLINS BULLOCH SGN/UTILITIES 12-17-91;PORTAL SGN 12-5-91 PUB UTILS

BULLOCH 522640
STATUS:

E. STATESBORO BYP FM SR 73/US 25 TO SR 73/US 301 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 6.85/11.02165
MANAGER: RAY METTS

CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1997

$

93

CONST 1998

$

453

FED SHARE $

362

GA. SHARE $

91

OTH SHARE $

PE 1999 ROW CONST

$

110

AFTER 99

AFTER 99

BULLOCH 532630
STATUS:

SR 73/US 301 N OF STATESBORO FM CR 445 TO SR 17/SCREVEN RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 5.75/9.25175 MANAGER: K. FULBRIGHT

CONG DIST. 1 & 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 53263X IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1998 ROW CONST

$ 250 AFTER 99 AFTER 99

~

t'l":__: __ :

l!f::C"

(~~-~-:-.:-'::.:j

\:=;>:"'''- -~- "i

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 69

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BULLOCH CR 927 OVER LUKE SWAMP BRANCH

PE 1994 UNDERWAY

541950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,

CONG DIST. 1

ROW LOCL

LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS STATUS: REQ BULLOCH DO ROW, UTIL & DETOURS 5/21/96.

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CONST 1998

$

331

FED SHARE $

265

GA. SHARE $

66

OTH SHARE $

BULLOCH 542040
STATUS:

CR 927 @ MANN BRANCH 9 MI S OF BROOKLET REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS REQ BULLOCH COUNTY DO ROW, UTIL & DET 5-6-96.

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1997

$

10

ROW LOCL

CONST 1999

$

514

FED SHARE $

411

GA. SHARE $

103

OTH SHARE $

BULLOCH 550500
STATUS:

BRANNEN ST/CS 802 FM GENTILLY RD/CS 673 TO SR 26 -STATESBORO RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): .55/.88495 MANAGER: TONY COLLINS STATESBORO SGN 4-1-91 ROW AND UTILITITES

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. . FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1992 UNDERWAY

ROW LOCL

CONST 1997

$

935

FED SHARE $

748

GA. SHARE $

187

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997IFY 1999

COASTAL

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

CAMDEN 511080
STATUS:

I-95 FM HARRIETT'S BLUFF RD TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Mileslkm): 6.72110.81248 MANAGER: J. GRAYBEAL CAMDEN COUNTY SGN 2-4-92 FOR UTILITIES

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y080 IS AN ASSOCIATED PROJECT.

CAMDEN 511086
STATUS:

I-95 OVER WHITE OAK CREEK & 51Y086 FOR IM $ BRIDGES I RECST. OR REHAB. LENGTH(Mileslkm): .181.28962 MANAGER: J, GRAYBEAL CAMDEN SGN 3-24-92 - UTILITIES SEE 511082

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y086 IS AN ASSOCIATED PROJECT.

CAMDEN 511087
STATUS:

I-95 OVER SATILLA RIVER; & 51Y086 FOR IM $ BRIDGES I RECST. OR REHAB.
LENGTH(Mileslkm): .291.46661
MANAGER: J. GRAYBEAL CAMDEN SGN 3-24-92 - UTILITIES; SEE 511082

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y086 IS AN ASSOCIATED PROJECT.

CAMDEN 51Y080
STATUS:

I-95 FM HARRIETT'S BLUFF RD TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Mileslkm): .001.00000 MANAGER: J. GRAYBEAL CAMDEN COUNTY SGN 2-4-92 FOR UTILITIES

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511080 IS AN ASSOCIATED PROJECT.

CAMDEN 51Y086
STATUS:

I-95 OVER WHITE OAK & SATILLA CKS FOR IM $; SEE 511086,087 BRIDGES I RECST. OR REHAB. LENGTH(Mileslkm): .001.00000
MANAGER: J. GRAYBEAL
CAMDEN SGN 3-24-92 - UTILITIES SEE 511082

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511086 IS AN ASSOCIATED PROJECT.

CAMDEN 521910
STATUS:

SR 40 FM KINGS BAY RD SE TO 5 LANE SECTION @ SR 40 SPUR RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
LENGTH(Mileslkm): 3,3015.30970
MANAGER: B. FERGUSON CT REQ COUNTY & ST. MARYS DO PE, ROW, UTIL & CST UP TO $1 M

CONG DIST. 1
FUND .SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CAMDEN 522690
STATUS:

SR 25IUS 17 BRIDGE OVER ST. MARY'S RIVER IFLA STATE LINE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Mileslkm): .001.00000 MANAGER: M. REYNOLDS BI-STATE AGRMT SGN 11I92;CO REFUSED 10I93;DOT TO PAY 11194

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 70

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1998 $ 23454

FED SHARE $ 18763

GA. SHARE $ 4691

OTH SHARE $

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1999 $ 4985

FED SHARE $ 3988

GA. SHARE $ 997

OTH SHARE $

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1999 $ 7073

FED SHARE $ 5658

GA. SHARE $ 1415

OTH SHARE $

PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $
GA. SHARE $
OTH SHARE $

0 0 3000 2700 300

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1999 $ 4000

FED SHARE $ 3600

GA. SHARE $ 400

OTH SHARE $

PE 1993 UNDERWAY ROW 1997 $ 2000 CONST 1999 $ 2500
FED SHARE $ 1500 GA. SHARE $
OTH SHARE $ 1000

PE 1994 UNDERWAY

ROW 1998 $

5

CONST 1999 $ 3050

FED SHARE $ 2440

GA. SHARE $ 610

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

COASTAL

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

CAMDEN 570810
STATUS:

CS 535/N RIVER CAUSEWAY FM POINT PETER RD TO NAVAL BASE

MINOR WIDEN & RESURF / RECST. OR REHAB.

CONG DIST. 1

LENGTH(Mi1es/km): 2.10/3.37890 - EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: TONY COLLINS

FUND SOURCE: UNKNOWN

COUNTY SGN CT ACQUIRE ROW 8-19-94;ST MARYS SGN ROW 7-24-94

FEDERAL HIGHWAY ADMIN FUNDS

CAMDEN 571040
STATUS:

KINGSLAND DOWNTOWN 6 BLOCK AREA AND LANDSCAPE SIDEWALKS / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: STAN HAMES LGPA TO BE DONE BY CONTRACT

/PROPOSED LANES:

CONG DIST. 1 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 71

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1997

$

10

CONST 1999

$ 2700

FED SHARE $ 2700

GA. SHARE $

OTH SHARE $

PE LOCL

ROW NONE

$

0

CONST 1997

$

365

FED SHARE $ 292

GA. SHARE $

OTH SHARE $

73

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 72

PROJECT LISTING BY ROC FY 1997IFY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

C-HP-A-.IT-.H-NA-OM--. -T-R--A-N-S-IT---O-P-E-R-A-T-PINR-G-O-JE-AC-ST-S-IS-DT-AA-TNA-C-E---FO--R--FY-R-E-G1-9IO-9N-7A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

5D5017 TRANSIT PROJECTS I OPERATIONS

CONG DIST. 1 & 11

FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY

OPERATING 1997

$ 5001

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT

FED SHARE $

690

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $ 4311

CHATHAM 505018
STATUS:

CAPITAL - CAPITAL MAINTENANCE ITEMS, TOOLS & EQUIPMENT,
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY
MANAGER: STEVE KISH

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

2229 1783
223 223

CHATHAM 505019
STATUS:

FACILITY IMPROVEMENT, CAPITAL MAINTENANCE ITEMS, SERVICE & TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH SUPPORT VEHICLES

CONG DIST. 1 & 11

CAPITAL 1997

$ 502

FUND SOURCE: NON FEDERAL TRANSIT

FED SHARE $

GA. SHARE $ 251 OTH SHARE $ 251

CHATHAM 5D5020
STATUS:

CAPITAL - FACILITY IMPROVEMENT & MODIFICATION, OFFICE EQUIP. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH

CONG DIST. 1 & 11

CAPITAL 1998

$ 286

FUND SOURCE: NON FEDERAL TRANSIT

FED SHARE $ 143

GA. SHARE $

OTH SHARE $ 143

CHATHAM 505022
STATUS:

CAPITAL - CAPITAL MAINTENANCE ITEMS, OFFICE EQUIPMENT AND
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY
MANAGER: STEVE KISH

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

2229 1783
223
223

CHATHAM 5D5023
STATUS:

TRANSIT OPERATING ASSISTANCE FOR FY 1998
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

5200 690
4510

CHATHAM 505024
STATUS:

CAPITAL - CAPITAL MAINTENANCE ITEMS, OFFICE EQUIP. & FURNIT. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH PARATRANSIT VEHICLES

CONG DIST. 1 & 11
FUND SOURCE; URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

CAPITAL 1999

$

FED SHARE $

GA. SHARE $

OTH SHARE $

2229 1783
223 223

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

COASTAL

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

20-Sep-1996 Page 73

FISCAL YEAR

COST ESTS

CHATHAM 5D5025
STATUS:

DOWNTOWN TRANSFER CENTER TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY
MANAGER: STEVE KISH

CONG DIST. 1 & 11

CAPITAL 1998

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

11250 9000 1125 1125

CHATHAM 5D5026
STATUS:

CAPITAL - REPLACE FARE COLLECTION SYSTEM, SERVICE/SUPPORT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH
VEHICLES

CONG DIST. 1 & 11

CAPITAL 1999

$ 735

FUND SOURCE: NON FEDERAL TRANSIT

FED SHARE $

GA. SHARE $ 368

OTH SHARE $ 368

CHATHAM 5D5027
STATUS:

TRANSIT OPERATING ASSISTANCE FOR FY 1999 TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1999

$

FED SHARE $

GA. SHARE $

OTH SHARE $

5200 690
4510

CHATHAM 5V7005
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH

CONG DIST. 1 & 11

CAPITAL 1997

$ 100

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

80

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

10

OTH SHARE $

10

CHATHAM 5V7017
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH

CONG DIST. 1 & 11

CAPITAL 1998

$ 105

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

84

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

11

OTH SHARE $

11

CHATHAM 5V7019
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH

CONG DIST. 1 & 11

CAPITAL 1999

$ 110

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

88

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

11

OTH SHARE $

11

CHATHAM 511060
STATUS:

I-95 @ CR 984/JIMMY DELOACH PKWY & 51Y060 FOR STP $

SAVANNAH TIP ~ 91-H-08

INTERCHANGE / NEW CONSTRUCTION

CONG DIST. 1

LENGTH(Miles/km): 1.07/1.72163- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. CHURCH

FUND SOURCE: NAT'L HIGHWAY

CHATHAM COUNTY SIGNED FOR ROW & UTILITIES 5-14-93

FEDERAL HIGHWAY ADMIN FUNDS

51Y060 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1992 UNDERWAY

ROW LOCL

CONST 1997

$ 8305

FED SHARE $ 6644

GA. SHARE $ 1661

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

20-Sep-1996 Page 74

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-ST-S---

CHATHAM 51132X

I-95 FOG DETECTION SYS IN BYRAN,CHATHAM,EFFINGHAM;511325,X;Z

MISCELLANEOUS IMPROVEMENTS / NEW CONSTRUCTION

CONG DIST. 0 & 0

LENGTH(Mi1es/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: I-STATE MAINT.

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

STATUS: NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

511325 IS AN ASSOCIATED PROJECT.

CHATHAM 51Y060
STATUS:

I-95 @ CR 984/JIMMY DELOACH PKWY -FOR STP $; SEE 511060

SAVANNAH TIP # 91-H-08

INTERCHANGE / NEW CONSTRUCTION

CONG DIST. 1

LENGTH(Mi1es/km): 1.07/1.72163- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. CHURCH

FUND SOURCE: SURFACE TRANSPORT.

SEE 511060

FEDERAL HIGHWAY ADMIN FUNDS

511060 IS AN ASSOCIATED PROJECT.

PE NONE $

ROW LOCL

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
1000 BOO 200

CHATHAM 521495
STATUS:

SR 204/ABERCORN ST @ VETERANS PKY (SOUTHWEST BYP)

SAVANNAH TIP # 93-H-05

INTERCHANGE / NEW CONSTRUCTION

CONG DIST. 1

LENGTH(Miles/km): 1.14/1.83426 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: G. ROSS

FUND SOURCE: SURFACE TRANSPORT.

CHATHAM COUNTY SGN FOR ROW & UTILITIES 4-24-92.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW LOCL

CONST 1998

$ 9202

FED SHARE $ 7362

GA. SHARE $ 1840

OTH SHARE $

CHATHAM 521505
STATUS:

HARRY S.TRUMAN PKY/PH IV FM WHITFIELD AVE TO MONTGOMERY X-RD CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 1.90/3.05710
MANAGER: G. ROSS CHATHAM SGN CT TO DO PE, ROW AND UTILITIES 6-15-95

SAVANNAH TIP # 87-H-10 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1997

$ 10082

FED SHARE $ 8066

GA. SHARE $ 2016

OTH SHARE $

CHATHAM 521508
STATUS:

HARRY S.TRUMAN PKY/PH III FM MONTGOMERY X-RD TO DERENNE AVE CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 2.20/3.53980 MANAGER: G. ROSS CHATHAM SGN CT TO DO PE, ROW & UTILITIES 6-15-95

SAVANNAH TIP # 87-H-09 CONG DIST. 1 & 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1997 $ 22540 FED SHARE $ 18032 GA. SHARE $ 4508 OTH SHARE $

CHATHAM 521770
STATUS:

SR 26 FM BRYANWOOD RD TO W/BULL RIV INCLD BIKE LANE & BRIDGE
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.90/3.05710
MANAGER: G. ROSS COUNTY SGN UTIL & PAY 20% MATCHING FUNDS BIKE PATH 6-26-92.

SAVANNAH TIP # 87-H-34 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 52Y770 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1997

$

200

CONST 1998 $ 8600

FED SHARE $ 6880

GA. SHARE $ 1720

OTH SHARE $

CHATHAM 521780
STATUS:

SR 26/GARDEN CITY FM CR 704 TO SR 25/US 17;INCL CLVT EXT TURN LANES / RECST. OR REHAB. LENGTH(Miles/km): .46/.74014- EXIST. LANES: 4 /PROPOSED LANES:
MANAGER: D. SMITH GARDEN CITY SGN UTILITIES 1-25-93;CHATHAM NO INVOLVED UTIL.

SAVANNAH TIP # 90-H-08 CONG DIST. 1
5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1992 UNDERWAY

ROW 1995 UNDERWAY

CONST 1997

$ 1604

FED SHARE $ 1283

GA. SHARE $ 321

OTH SHARE $

1::!

\:...;:-

\'!.. ~--- --J

_.)

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 75

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

-P--.I-.N--O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHATHAM SR 26 FM 4-LN E/LYNES PKWY TO VICTORY DR/CS 188

SAVANNAH TIP # 87-H-18B

PE 1993 UNDERWAY

521855 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 11

ROW LOCL

LENGTH(Miles/krn): 1.38/2.22042

CONST 1997 $ 7090

MANAGER: G. ROSS

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 3545

STATUS: CHATHAM SGN DO ROW, UTIL & 50% CST COST 11-30-90.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

OTH SHARE $ 3545

CHATHAM 521860
STATUS:

SR 25 FM 4-LN N/SR 204 NE TO SR 307(INCL PARALLEL BRIDGE) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): 3.69/5.93721 MANAGER: G. ROSS
CHATHAM CO SGN FOR ROW & UTILITIES 10-16-90

SAVANNAH TIP # 87-H-34 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1997

$ 6049

FED SHARE $ 4839

GA. SHARE $ 1210

OTH SHARE $

CHATHAM 521865
STATUS:

SR 25/US 17 FM OGEECHEE RVR OFLW TO S/SR 204(& NEW BR) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): 2.40/3.86160 MANAGER: G. ROSS CHATHAM COUNTY SIGNED 11/9/90 FOR ROW AND UTILITIES.

SAVANNAH TIP # 90-H-07 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1999

$ 6310

FED SHARE $ 5048

GA. SHARE $ 1262

OTH SHARE $

CHATHAM 521867
STATUS:

SR 25/US 17/0CEAN HWY @ OGEECHEE RIVER OVERFLOW REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): .05/.08045
MANAGER: G. ROSS CHATHAM COUNTY SIGNED 11/9/90 FOR ROW AND UTILITIES

SAVANNAH TIP # 93-H-11 CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1999 $ 1455 FED SHARE $ 1164 GA. SHARE $ 291 OTH SHARE $

CHATHAM SR 17/US 80 FM SR 17 TO CHERRY ST IN BLOOMINGDALE/EFFINGHAM

SAVANNAH TIP # 96-H-5

PE NONE

$

0

52217X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE $

0

LENGTH(Miles/krn): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: UNKNOWN

FUND SOURCE: SURFACE TRANSPORT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

522170 IS AN ASSOCIATED PROJECT.

CHATHAM 522490
STATUS:

SR 26/US80 FM W OF BULL RIVER TO E OF LAZARETTO CRK/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): 5.77/9.28393 MANAGER: G. ROSS CHATHAM SGN FOR UTILITIES 11-17-95

SAVANNAH TIP # 93-H-03 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 UNDERWAY

ROW 1997

$

559

CONST 19-98 $ 35345

FED SHARE $ 28276

GA. SHARE $ 7069

OTH SHARE $

CHATHAM 522610
STATUS:

SR 25/HOULIHAN BRIDGE OVER THE SAVANNAH RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/krn): .30/.48270 MANAGER: D. CHURCH NOT APPLICABLE

SAVANNAH TIP # 90-H-06 CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1999

$ 7517

FED SHARE $ 6014

GA. SHARE $ 1503

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 76

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHATHAM SR 30 AT SR 21 AND SR 25 IN PORT WENTWORTH

SAVANNAH TIP # 92-H-05

PE 1995 UNDERWAY

522670 STATUS:

INTERSECTION IMPROVEMENT / RECST. OR REHAB.

CONG DIST. 1

LENGTH(Miles/km): .94/1.51246 - EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: TONY COLLINS

FUND SOURCE: SURFACE TRANSPORT.

CHATHAM SGN FOR UTILITIES 11-17-95

FEDERAL HIGHWAY ADMIN FUNDS

ROW 1997

$

60

CONST 1998 $ 546

FED SHARE $

437

GA. SHARE $ 109

OTH SHARE $

CHATHAM 522800
STATUS:

SR 30 RELOC FM EAST OF SR 21 TO HOULIHAN BRIDGE/SR 25 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
LENGTH(Miles/km): 1.50/2.41350 MANAGER: D. CHURCH COUNTY SIGNED CONTRACT FOR PE, ROW & UTILITIES ON 11-18-94.

SAVANNAH TIP # 96-H-3 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW LOCL CONST

$

5

AFTER 99

CHATHAM 52Y770
STATUS:

SR 26 FM BRYANWOOD RD TO BULL RIV (SHOWN FOR BIKE FUNDS 33B)

SAVANNAH TIP # 87-H-34

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 1

LENGTH(Miles/km): 1.94/3.12146 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: G. ROSS

FUND SOURCE: TRANS. ENHANCE.

FEDERAL HIGHWAY ADMIN FUNDS

521770 IS AN ASSOCIATED PROJECT.

CHATHAM 531260
STATUS:

SR 204 EB FM MP 2.0-3.2;WB MP 3.7-4.7 SE OF MELDRIM ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.40/3.86160 MANAGER: TONY COLLINS CHATHAM SGN 10-11-91 FOR UTILITIES.

SAVANNAH TIP # 92-H-07 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 532510
STATUS:

SR 204/ABERCORN ST. @ EISHENHOWER IN SAVANNAH

SAVANNAH TIP # 93-H-06

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 1

LENGTH(Miles/km): .30/.48270- EXIST. LANES: 7 /PROPOSED LANES: 8

MANAGER: TONY COLLINS

FUND SOURCE: HWY. SAFETY

SAVANNAH SGN FOR UTILITIES 4-12-93;CHATHAM NO INVOLVED UTIL

FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 532570
STATUS:

ABERCORN ST @ TIBET AVE INTERSECTION IMPROVEMENT / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 6 /PROPOSED LANES:
MANAGER: G. ROSS COUNTY SGN CONTRACT FOR PE, ROW & UTILITIES 6-27-94

SAVANNAH TIP # 93-H-12 CONG DIST. 1 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 532750
STATUS:

SR 204/ABERCORN ST. @ EGRESS LN/OGLETHORPE MALL IN SAVANNAH
TURN LANES / SAFETY LENGTH(Miles/km): .31/.49879 - EXIST. LANES: 6 /PROPOSED LANES: MANAGER: TONY COLLINS
TO BE DONE BY CONTRACT

SAVANNAH TIP # 97-H-01 CONG DIST. 1 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1998

$

250

FED SHARE $

200

GA. SHARE $

OTH SHARE $

50

PE 1992 UNDERWAY

ROW 1996 UNDERWAY

CONST 1998

$

739

FED SHARE $ 591

GA. SHARE $

148

OTH SHARE $

PE NONE $

0

ROW 1996 UNDERWAY

CONST 1997

$

303

FED SHARE $ 273

GA. SHARE $

30

OTH SHARE $

PE 1996 UNDERWAY ROW LOCL
CONST 1998 $ 1270 FED SHARE $ 1016 GA. SHARE $ 254 OTH SHARE $

PE 1999 ROW LOCL CONST

$

5

AFTER 99

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 77

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHATHAM SR 204/ABERCORN ST. @ DERENNE AVE IN SAVANNAH

SAVANNAH TIP # 97-H-02

PE 1999

$

5

532760 TURN LANES / SAFETY

CONG DIST. 1 & 11

ROW LOCL

LENGTH(Miles/km): .07/.11263- EXIST. LANES: 5 /PROPOSED LANES: 5

CONST

AFTER 99

MANAGER: TONY COLLINS

FUND SOURCE: HWY. SAFETY

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 532770
STATUS:

SR 204/ABERCORN ST. @ APACHE AVE IN SAVANNAH

SAVANNAH TIP # 97-H-03

TURN LANES / SAFETY

CONG DIST. 1

LENGTH(Miles/km): .47/.75623- EXIST. LANES: 6 /PROPOSED LANES: 6

MANAGER: TONY COLLINS

FUND SOURCE: HWY. SAFETY

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW LOCL CONST

$

5

AFTER 99

CHATHAM 532780
STATUS:

SR 204/ABERCORN ST. @ LARGO DRIVE IN SAVANNAH
TURN LANES / SAFETY LENGTH(Miles/km): .41/.65969 -EXIST. LANES: 6 MANAGER: TONY COLLINS TO BE DONE BY CONTRACT

/PROPOSED

LANES:

SAVANNAH TIP # 97-H-04 CONG DIST. 1 6 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW LOCL CONST

$

5

AFTER 99

CHATHAM 550570
STATUS:

MIDDLEGROUND & MONTGOMERY CROSS RDS FM ABERCORN TO ABRCRN EX RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.80/4.50520 MANAGER: G. ROSS COUNTY SGN CONTRACT FOR PE, ROW & UTILITIES 6-27-94

SAVANNAH TIP # 94-H-22 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 550580
STATUS:

WHITE/COFFEE BLUFF RDS FM N OF LITTLE OGEECHEE RVR TO WILLOW RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.10/3.37890
MANAGER: G. ROSS CHATHAM SGN CONTRACT FOR PE, ROW & UTILITIES 6-15-95

SAVANNAH TIP # 94-H-23 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 550590
STATUS:

POOLER PARKWAY EXTENSION FM QUACCO RD TO US 80 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 4.18/6.72562 MANAGER: D. CHURCH CT SGN COUNTY DO PE, UTIL & ROW 5/24/96.

SAVANNAH TIP # 90-H-06 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 570860
STATUS:

EXT. OF R. MCCORKLE SR BIKEWAY ON WILMINGTON ISLAND

SAVANNAH TIP # 93-H-08

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 1

LENGTH(Miles/km): 1.34/2.15606 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: CHRIS SIMONS

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$ 3900

FED SHARE $ 3120

GA. SHARE $

780

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1999

$ 4760

FED SHARE $ 3808

GA. SHARE $

952

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$ 11699

FED SHARE $ 9359

GA. SHARE $ 2340

OTH SHARE $

PE LOCL

ROW LOCL

CONST 1997

$

110

FED SHARE $

88

GA. SHARE $

OTH SHARE $

22

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 78

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHATHAM SKIDAWAY RD FM FERGUSON AVE TO S OF VICTORY DR IN SAVANNAH

SAVANNAH TIP # 94-H-11

PE 1996 UNDERWAY

571060 INTERSECTION IMPROVEMENT / RECST. OR REHAB.

CONG DIST. 1 & 11

ROW LOCL

LENGTH(Miles/km): 4.10/6.59690 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST 1999 $ 7335

MANAGER: BILL MOSKAL STATUS: CHATHAM SGN CONTRACT FOR PE, ROW & UTILITIES 11-18-94

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 5868 GA. SHARE $ 1467

OTH SHARE $

CHATHAM 571211
STATUS:

BOAT RAMPS/LANDSCAPING IN SAVANNAH

SAVANNAH TIP # 97-H-6

LANDSCAPING / ENHANCEMENT

CONG DIST. 1

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1998

$

630

FED SHARE $ 504

GA. SHARE $

OTH SHARE $ 126

CHATHAM 571212
STATUS:

RESTORATION OF TYBEE ISLAND LIGHTHOUSE

SAVANNAH TIP # 97-H-5

HISTORIC PRESERVATION / ENHANCEMENT

CONG DIST. 1

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1998

$

350

FED SHARE $ 250

GA. SHARE $

OTH SHARE $ 100

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

COASTAL

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

EFFINGHA I-16 WIDEN 10 BRIDGES @ MP 138.3; 145.9; 146.6; 147.2/BRYAN

51119X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/krn): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: I-STATE MAINT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

511190 IS AN ASSOCIATED PROJECT.

EFFINGHA I-95 FOG DETECTION SYS IN BYRAN,CHATHAM,EFFINGHAM;511325,X;Z 51132Z MISCELLANEOUS IMPROVEMENTS / NEW CONSTRUCTION
LENGTH(Miles/krn): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: KARL ALFF
STATUS: NOT APPLICABLE

CONG DIST. 0 & 0 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511325 IS AN ASSOCIATED PROJECT.

EFFINGHA SR 17&26/US 80 FM SR 17 TO CHERRY ST IN BLOOMINGDALE/CHATHAM
522170 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): .79/1.27111 MANAGER: M. REYNOLDS
STATUS: EFFINGHAM SGN 9/92;CHATHAM SGN 7/92 AND WILL PAY CITY UTIL.

SAVANNAH TIP # 87-H-30 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 52217X IS AN ASSOCIATED PROJECT.

EFFINGHA CR 307 @ EBENEZER CREEK NW OF CR 72 532390 BRIDGES / REPLACEMENT
LENGTH(Miles/krn): .11/.17699 MANAGER: TONY COLLINS STATUS: EFFINGHAM COUNTY SGN DO ROW, UTILITIES & DETOURS 4-7-92

CONG DIST. 1 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 79

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

PE 1993 UNDERWAY

ROW 1997

$

896

CONST 1998

$ 1434

FED SHARE $ 1147

GA. SHARE $ 287

OTH SHARE $

PE 1993 UNDERWAY

ROW LOCL

CONST 1997 $ 140

FED SHARE $ 112

GA. SHARE $

28

OTH SHARE $

COUNTY P. I. NO.

DESCRIPTION PROJECT DATA

GLYNN 5D8001
STATUS:

OPERATIONAL PLANNING TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GLYNN COUNTY
MANAGER: STEVE KISH

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997IFY 1999

COASTAL

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

CONG DIST. 1
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

20-Sep-1996 Page 80

FISCAL YEAR

COST ESTS

CAPITAL 1997

$

20

FED SHARE $

16

GA. SHARE $

2

OTH SHARE $

2

GLYNN 5D8002
STATUS:

PURCHASE VEHICLES AND MISC. CAPITAL EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GLYNN COUNTY
MANAGER: STEVE KISH

CONG DIST. 1
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$ 385

FED SHARE $ 308

GA. SHARE $

39

OTH SHARE $

39

GLYNN 5D8003
STATUS:

PUBLIC TRANSIT SERVICE FOR BRUNSWICK AND GLYNN COUNTY
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: GLYNN COUNTY MANAGER: STEVE KISH

CONG DIST. 1

OPERATING 1998 $

87

FUND SOURCE: URBAN TRANSIT

FED SHARE $

44

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

44

GLYNN 5D8004
STATUS:

PUBLIC TRANSIT SERVICE FOR BRUNSWICK AND GLYNN COUNTY TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GLYNN COUNTY
MANAGER: STEVE KISH

CONG DIST. 1

CAPITAL 1999

$

87

FUND SOURCE: URBAN TRANSIT

FED SHARE $

44

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

44

GLYNN 5D8006
STATUS:

TRANSIT VEHICLES, FACILITY LEASE, CAP. MAINT., ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GLYNN COUNTY
MANAGER: STEVE KISH

CONG DIST. 1
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1999

$ 220

FED SHARE $ 176

GA. SHARE $

22

OTH SHARE $

22

GLYNN 5V7016
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN GLYNN COUNTY
MANAGER: STEVE KISH

CONG DIST. 1

CAPITAL 1997

$

50

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

40

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

5

OTH SHARE $

5

GLYNN 5V7018
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN GLYNN MPO AREA
MANAGER: STEVE KISH

CONG DIST. 1

CAPITAL 1998

$

52

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

42

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

5

OTH SHARE $

5

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 81

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

GLYNN ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

5V7020 TRANSIT PROJECTS / CAPITAL

CONG DIST. 1

FUNDS RECIPIENT: AGENCIES IN GLYNN MPO AREA

CAPITAL 1999

$

55

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

44

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

6

OTH ;mARE $

6

GLYNN 511245
STATUS:

I-95 @ RA 105 NEW BUILDING, PARKING AND SEWER -- PHASE II REST AREA / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: J. GARLAND NOT APPLICABLE

BRUNSWICK TIP # BATS96-03 CONG DIST. 1 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997 $ 2998 FED SHARE $ 2698 GA. SHARE $ 300 OTH SHARE $

GLYNN 520890
STATUS:

SR 25/BRUNSWICK FM S OF TORRAS CAUSEWAY N TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 1.88/3.02492
MANAGER: G. BOWMAN BRUNSWICK SIGNED 2/22/89 UTILITIES

BRUNSWICK TIP # BATS93-05 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. . FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW 1995 UNDERWAY CONST 1998 $ 4260
FED SHARE $ 3408 GA. SHARE $ 852 OTH SHARE $

GLYNN 522042
STATUS:

SR 25/BRUNSWICK REMOVAL OF OLD SIDNEY LANIER BRIDGE BRIDGE REMOVAL / REPLACEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 4 /PROPOSED LANES:
MANAGER: J. GRAYBEAL OTHER SHARE IS COAST GUARD

BRUNSWICK TIP # BATS96-05 CONG DIST. 1 4
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $
GA. SHARE $
OTH SHARE $

0 0 3820 1910
1910

GLYNN 522310
STATUS:

SR 27/US 341 @ I-95 FM W/CRISPEN BLVD TO W/YELLOW BLUFF CK RECONSTRUCTION & WIDENING FROM 5 LANES TO 6 LANES. LENGTH(Miles/km): .87/1.39983 MANAGER: BILL MOSKAL
BRUNSWICK REF DO UTIL 8/7/96;GLYNN REF DO UTILITIES 8/26/93

BRUNSWICK TIP # BATS93-02 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1997

$ 4803

FED SHARE $ 3842

GA. SHARE $ 961

OTH SHARE $

GLYNN 522730
STATUS:

SR 25 @ CS 427/TALMADGE AVE & SR 25C/GLOUCESTER ST/BRUNSWICK
INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .36/.57924- EXIST. LANES: 4 /PROPOSED LANES: MANAGER: TONY COLLINS REQ CITY DO ROW & UTIL 1/94; LETTER 5/95 = NO UTIL INVOLVED

BRUNSWICK TIP # BATS94-08 CONG DIST. 1
5 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1997 $ 388

FED SHARE $ 349

GA. SHARE $

39

OTH SHARE $

GLYNN 562110
STATUS:

CR 586 @ BURNETT CREEK EAST OF SR 27 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS GLYNN SIGNED FOR ROW, UTILITIES & DETOURS 9-15-94

BRUNSWICK TIP # BATS96-04 CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW LOCL

CONST 1998 $ 266

FED SHARE $ 213

GA. SHARE $

53

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

COASTAL

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

GLYNN 562120
STATUS:

SR 520 OVER LATHAM RIVER AT TWO LOCATIONS ON JEKYLL CAUSEWAY
BRIDGES / NEW CONSTRUCTION LENGTH(Miles/km): .20/.32180 MANAGER: KEVIN HOSEY REQ GLYNN CO DO UTIL 2-23-95(Y); CORPS ENGRS TO PAY 75% CST

BRUNSWICK TIP # BATS96-05 CONG DIST. 1
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 82

FISCAL YEAR

COST ESTS

PE 1997

$

ROW NONE

$

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

40 0
4771
1192 3579

'<

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

COASTAL

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

LIBERTY 520781
STATUS:

SR 196 FM US84/SR 38 TO SR 17/SR 25 SW OF I-95 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 8.85/14.23965
MANAGER: M. REYNOLDS

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521190 IS AN ASSOCIATED PROJECT.

;10-Sep-1996 Page 83

FISCAL YEAR

COST ESTS

PE 1992
ROW 1998 CONST

UNDERWAY $ 1140 AFTER 99

LIBERTY 571030
STATUS:

CEMETERY WALL REPAIR @ MIDWAY CHURCH

MISCELLANEOUS IMPROVEMENTS / ENHANCEMENT

CONG DIST. 1

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: MEG BRYSON

FUND SOURCE: TRANS. ENHANCE.

LGPA TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW NONE $

0

CONST 1997

$

48

FED SHARE $

38

GA. SHARE $

OTH SHARE $

10

LIBERTY 571210
STATUS:

INTERPETIVE SIGNING, BIKE/PED PATH, LANDSCAPING, STREETSCAPE BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: TO BE DONE BY CONTRACT

CONG DIST. 1 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL
ROW LOCL
CONST 1998 $ FED SHARE $
GA. SHARE $ OTH SHARE $

1000 800
200

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

COASTAL

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

LONG 54196X
STATUS:

SR 196 OVER BEARD'S CREEK/ SEE TATTNALL C0--541960

UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

541960 IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 84

FISCAL YEAR

COST ESTS

PE NONE $

0

ROW NONE

$

0

CONST NONE

$

0

\!L- -~

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 85

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COASTAL

FISCAL

COST

-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S- -

MCINTOSH SR 25/US 17 @ BUTLER RIVER 1 MI SOUTH OF DARIEN

PE 1993 UNDERWAY

522240 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

C.ONG DIST. 1

ROW 1997

$

5

LENGTH(Miles/km): .80/1.28720

CONST 1997 $ 4062

MANAGER: TONY COLLINS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 3250

STATUS: MCINTOSH SIGNED FOR UTILITIES 6-9-92

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 812

OTH SHARE $

MCINTOSH RESTORE LIGHTHOUSE ON SAPELO ISLAND

571213 HISTORIC PRESERVATION / ENHANCEMENT

CONG DIST. 1

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1998 $ 220

FED SHARE $ 176

GA. SHARE $

OTH SHARE $

44

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COOSA VALLEY REGIONAL DEVELOPMENT CENTER
Bartow Catoosa Chattooga
Dade Floyd Gordon Haralson Paulding Polk Walker

10

. 0

10

-

'

SCALE IN MILES

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

COOSA VALLEY

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

BARTOW 620832
STATUS:

SR 61 @ ETOWAH RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. LENGTH(Miles/km): .63/1.01367 MANAGER: M. REYNOLDS REQ CO 12/84-UTIL;CITY SGN 12/84 CITY OWNED UTIL. AS (41)

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

BARTOW 621255
STATUS:

SR 61/CARTERSVILLE FM CR 533 NORTH TO HENDERSON DRIVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 2.61/4.19949
MANAGER: M. REYNOLDS CO REQ DO UTILITIES 3-11-96;REQ CARTERSVILLE DO UTIL 3-11-96

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

BARTOW 621440
STATUS:

SR 113 FM CR 31/STILESBORO NE TO SR 61 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.30/6.91870 MANAGER: M. GANNAWAY BARTOW COUNTY REFUSED 11-23-92

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 86

FISCAL YEAR

COST ESTS

PE 1995 UNDERWAY ROW 1988 UNDERWAY CONST 1999 $ 1500
FED SHARE $ 1200 GA. SHARE $ 300 OTH SHARE $

PE 1992

UNDERWAY

ROW 1996 UNDERWAY

CONST 1999

$ 3525

FED SHARE $ 2820

GA. SHARE $ 705

OTH SHARE $

PE 1999 ROW CONST

$ 204 AFTER 99
AFTER 99

BARTOW 62168X
STATUS:

SR 61@ 3 LOCATIONS PAULDING & BARTOW . . . SEE PAULDING CO UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: UNKNOWN

LANES:

CONG DIST. 0 & 0 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 621680 IS AN ASSOCIATED PROJECT.

BARTOW 631402
STATUS:

SR 3/US 41 FROM POSTELLE ST/CS 791 TO MLK IN CARTERSVILLE

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 7

LENGTH(Miles/km): 1.27/2.04343 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: GREG PARKER

FUND SOURCE: HWY. SAFETY

CARTERSVILLE SGN DO ROW & PUB UTIL 7-24-94.

FEDERAL HIGHWAY ADMIN FUNDS

BARTOW 631510
STATUS:

SR 20 AT STAMP CREEK 5.8 MI SE OF WHITE REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .37/.59533 MANAGER: GREG PARKER BARTOW SGN DO UTILITIES 4-25-96.

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

PE 1994 UNDERWAY

ROW LOCL

CONST 1998

$

565

FED SHARE $

509

GA. SHARE $

57

OTH SHARE $

PE 1996 ROW 1999 CONST

UNDERWAY

$

34

AFTER 99

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 87

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

* -P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CATOOSA I-75 @ SR 3/US 41; & 61Y730 FOR NH $

CHATTANOOGA TIP IM-97-5

PE 1992 UNDERWAY

610730 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 9

ROW 1997 $ 4250

LENGTH(Miles/km): .95/1.52855 - EXIST. LANES: 2 /PROPOSED LANES: 4

CONST

AFTER 99

MANAGER: KEVIN HOSEY

FUND SOURCE: I-STATE MAINT.

STATUS: REQ CATOOSA COUNTY DO UTILITIES 10-26-92

FEDERAL HIGHWAY ADMIN FUNDS

61Y730 IS AN ASSOCIATED PROJECT.

CATOOSA CHICKAMAUGA BYP FM N OF MCFARLAND RD TO US 27 @ SR 2/WALKER

PE NONE

$

0

62119X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: M. GANNAWAY

FUND SOURCE: STATE FUNDS

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

621194 IS AN ASSOCIATED PROJECT.

CATOOSA 621530
STATUS:

SR 151 FM RELOC. HACKETT RD/CR 179 N TO I-75 @ RINGGOLD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.30/2.09170 MANAGER: K. FULBRIGHT REQ CATOOSA DO UTIL 3-11-96;CITY HAS NO OWNED UTIL 3-18-96.

CHATTANOOGA TIP # STP-98-2 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y530 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1998 $ 200

CONST 1999

$ 2500

FED SHARE $ 2000

GA. SHARE $ 500

OTH SHARE $

CATOOSA 62Y530
STATUS:

SR 151 FM RELOC CR 179 TO I-75; TO SHOW IM FUNDS FOR RAMPS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .00/.00000 MANAGER: K. FULBRIGHT

CHATTANOOGA TIP # STP-98-11

PE NONE $

0

CONG DIST. 9

ROW NONE

$

0

CONST 1999 $ 200

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 180

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

20

621530 IS AN ASSOCIATED PROJECT.

OTH SHARE $

CATOOSA 631420
STATUS:

SR2/SR 3/US 41 AT SPARKS STREET IN RINGGOLD

CHATTANOOGA TIP # STP-97-6

TURN LANES / SAFETY

CONG DIST. 9

LENGTH(Miles/km): .13/.20917- EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: GREG PARKER

FUND SOURCE: HWY. SAFETY

REV REQ CITY OF RINGGOLD DO UTILITIES 9-21-94

FEDERAL HIGHWAY ADMIN FUNDS

CATOOSA 631505
STATUS:

SR 2/US 41 @ SOUTH CHICKAMAUGA CREEK IN WEST RINGGOLD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): .92/1.48028 MANAGER: GREG PARKER RINGGOLD SGN DO UTILITIES 4-22-96;CATOOSA NO INVOLVED UTIL.

* CHATTANOOGA TIP BHF-99-4
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CATOOSA 631520
STATUS:

SR 2 AT TIGER CREEK 2.4 MI EAST OF RINGGOLD REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007
MANAGER: GREG PARKER CATOOSA REFUSED UTILITIES 9-13-94(Y)

* CHATTANOOGA TIP BHF-99-3
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY ROW 1996 UNDERWAY CONST 1997 $ 250
FED SHARE $ 250 GA. SHARE $
OTH SHARE $

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1999

$ 1917

FED SHARE $ 1534

GA. SHARE $ 383

OTH SHARE $

PE 1997 UNDERWAY

ROW NONE $

0

CONST 1999

$

568

FED SHARE $ 454

GA. SHARE $ 114

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

COOSA VALLEY

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

CATOOSA 631600
STATUS:

SR 151 FROM CR 382 TO SR 2/US 41 IN RINGOLD AND SIGNALS

CHATTANOOGA TIP # STP-180-1(7)

TURN LANES / SAFETY

CONG DIST. 9

LENGTH(Miles/km): .92/1.48028 - EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: GREG PARKER

FUND SOURCE: SURFACE TRANSPORT.

CATOOSA SGN FOR ROW, UTIL, PUB UTIL & PVT UTIL 4-19-95.

FEDERAL HIGHWAY ADMIN FUNDS

CATOOSA 650430
STATUS:

SR 3/US 41 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .66/1.06194 MANAGER: K. FULBRIGHT REQ CATOOSA COUNTY DO UTILITIES 3-2-92; BI-STATE SGN 6-2-94

CHATTANOOGA TIP # STP-99-1 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CATOOSA 650440
STATUS:

SR 146/CLOUD SPRINGS RD FM LAKEVIEW DR TO I-75/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 2.34/3.76506 MANAGER: M. GANNAWAY REQ CATOOSA DO UTILITIES 3-2-92

CATOOSA 65Y440
STATUS:

SR 146/CLOUD SPGS RD FM LAKEVIEW TO I-75&BRIDGE .. SEE 650440 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.34/3.76506 MANAGER: M. GANNAWAY

CATOOSA 670710
STATUS:

CR 259 SOUTH OF RINGGOLD @ LITTLE CHICKAMAUGA CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .14/.22526 MANAGER: GREG PARKER CATOOSA SGN FOR ROW, UTILITIES & DETOURS 11-6-95

CHATTANOOGA TIP # STP-99-2 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 65Y440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP # STP-98-2 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 650440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP # BRZ-98-1 CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 88

FISCAL YEAR

COST ESTS

PE 1996 UNDERWAY

ROW LOCL

CONST 1997

$

408

FED SHARE $ 326

GA. SHARE $

82

OTH SHARE $

PE 1993 UNDERWAY

ROW 1997

$

165

CONST 1999

$

655

FED SHARE $ 524

GA. SHARE $ 131

OTH SHARE $

PE 1992 ROW 1998 CONST

UNDERWAY
$ 3551 AFTER 99

PE NONE ROW 1998 CONST

$

0

$ 598

AFTER 99

PE 1996 UNDERWAY

ROW LOCL

CONST 1998 $ 1190

FED SHARE $

952

GA. SHARE $ 238

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 89

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L--D--EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHATTOOG CR 170/PENN BRIDGE RD OVER CHATTOOGA RIVER SE OF TRION

PE 1993 UNDERWAY

670750 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 7

ROW LOCL

LENGTH(Miles/km): .15/.24135

CONST 1997

$ 1079

MANAGER: GREG PARKER

.FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

863

STATUS: CHATTOOGA SGN 4-7-92 FOR ROW, UTILITIES & DETOURS

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 216

OTH SHARE $

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 90

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.N--O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DADE

I-24/I-59 INTERCHANGE - THREE BRIDGES

CHATTANOOGA TIP # IM-97-8

PE 1995 UNDERWAY

610990 BRIDGES / RECST. OR REHAB,

CONG DIST. 9

ROW NONE $

0

LENGTH(Miles/km): ,00/.00000

CONST 1997

$ 1169

MANAGER: M. GANNAWAY STATUS: DADE COUNTY SIGNED FOR UTILITIES 2-27-95

FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 1052

GA. SHARE $

117

OTH SHARE $

DADE 611020
STATUS:

I-24/SR 409 FROM I-59 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 3.27/5.26143 MANAGER: M. GANNAWAY

CHATTANOOGA TIP # NH-99-5 CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW NONE CONST

$ 325

$

0

AFTER 99

DADE 621230
STATUS:

SR 136/TRENTON FM CR 52 TO SR 58/US 11 INCL INTERCHANGE @ 59 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): .80/1.28720
MANAGER: M. GANNAWAY DADE SGN 12-18-92 & TRENTON SGN 12-29-92 FOR UTILITIES.

DADE 62Y230
STATUS:

SR 136 FM CR 52 TO SR 58; TO SHOW IM FUNDS FOR INT WITH I-59 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): ,00/.00000
MANAGER: M. GANNAWAY

DADE 630915
STATUS:

SR 136 E/TRENTON EB 6.4-7.2/EB 10,6-11.85/WB 10.6-11.85 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.05/3.29845 MANAGER: GREG PARKER DADE SGN 10-15-91 - UTIL; TRENTON SGN 10-11-91 PUB UTIL.

CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y230 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 621230 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1992 ROW 1998 CONST

UNDERWAY $ 410 AFTER 99

PE NONE $

0

ROW 1997

$

100

CONST 1999 $ 500

FED SHARE $ 450

GA. SHARE $

50

OTH SHARE $

PE 1992 UNDERWAY

ROW 1996 UNDERWAY

CONST 1998

$ 1613

FED SHARE $ 1290

GA. SHARE $ 323

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 91

PROJECT LISTING BY RDC FY 1997IFY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-TS----------------------------Y-EA-R---------E-S-T-S--

FLOYD PUBLIC TRANSIT SERVICE FOR THE CITY OF ROME

6D6016 TRANSIT PROJECTS I OPERATIONS

CONG DIST. 7

FUNDS RECIPIENT: ROME TRANSIT DEPARTMENT MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT

OPERATING 1997

$ 1150

FED SHARE $ 230

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

71

OTH SHARE $

849

FLOYD 6D6017
STATUS:

SUPV.VCH.,TRANS.VCH(WIL) . 1 MAINT.TLS&EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ROME TRANSIT DEPARTMENT MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$ 460

FED SHARE $ 368

GA. SHARE $

46

OTH SHARE $

46

FLOYD 6D6019
STATUS:

TRAN.VCH WIL 1 SUPV1 VCH.,ADM.VAN,MANT.TLS&EQUIP.,MNT.ITEMS
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1998

$ 592

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

474

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

59

OTH SHARE $

59

FLOYD 6D6021
STATUS:

TRANS VCH WIL,ADMIN VAN,MAINT.TLS&EQUIP.,MAINT ITEMS TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: ROME TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$ 592

FED SHARE $

474

GA. SHARE $

59

OTH SHARE $

59

FLOYD 6D6022
STATUS:

PUBLIC TRANSIT SERVICE FOR THE CITY OF ROME TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ROME TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1190 150
1040

FLOYD 6D6023
STATUS:

TRANSIT VCH WIL, SUPERV.VCH.,MAINTENANCE TOOLS
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ROME TRANSIT DEPARTMENT
MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1999

$ 684

FED SHARE $

547

GA. SHARE $

68

OTH SHARE $

68

FLOYD 6D6024
STATUS:

TRANSIT VCH. WIL, SUPERV.VCYH. 1 MAINTEN TOOLS AND EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ROME TRANSIT DEPARTMENT
MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1999

$ 684

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $ 547

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

68

OTH SHARE $

68

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 92

PROJECT LISTING BY ROC FY 1997IFY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FLOYD OPERATING SCHEDULE

606025 TRANSIT PROJECTS I OPERATIONS

CONG DIST. 7

FUNDS RECIPIENT: ROME TRANSIT DEPARTMENT

OPERATING 1999

$ 1232

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT

FED SHARE $ 150

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $ 1082

FLOYD 6V7014
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA
MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1997

$

30

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

FLOYD 6V7015
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1998

$

31

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

FLOYD 6V7018
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA
MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1999

$

33

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

4

OTH SHARE $

3

FLOYD 620590
STATUS:

SR 1IUS 27 IN ROME FM 5TH AVE TO JOHN DAVENPORT DR RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. LENGTH(Mileslkm): .171.27353 MANAGER: B. FERGUSON FLOYD NO UTILITIES; ROME SGN UTILITIES EXCEPT AT RR 11-2-93

ROME TIP # L-85-11 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1997

$ 1113

CONST 1999

$ 2952

FED SHARE $ 2362

GA. SHARE $

590

OTH SHARE $

FLOYD 621550
STATUS:

SR 201100 FM SR 100 NORTH TO SR 100 SOUTH @ COOSAIINCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Mileslkm): 2.9514.74655
MANAGER: GREG PARKER LETTER 1194: NO PUB UTIL BUT HAS PVT UTIL.EXPECTS DOT TO PAY

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1999 CONST

UNDERWAY

$

790

AFTER 99

FLOYD 621560
STATUS:

SR 53 FM MP 0.54 TO 14.15 [WON 20 CLVTS] BRIDGES I RECST. OR REHAB. LENGTH(Mileslkm): 14.89123.95801 MANAGER: GREG PARKER
FLOYD REFUSED 1-19-94; CAVE SPRING SGN 7192 AS MUCH AS POSS.

ROME TIP # S-94-14 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1998
CONST

UNDERWAY

$

44

AFTER 99

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196, (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 93

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

* -P--.I-.-N-O--. ----------------PR--O-JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FLOYD WEST ROME BYP FM HORSELEG CRK RD TO SR 20

ROME TIP S-92-24

PE NONE

$

0

621660 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

CONG DIST. 7

ROW 1998

$ 1582

LENGTH{Miles/krn): 3.60/5.79240 MANAGER: M. GANNAWAY

FUND SOURCE: NAT'L HIGHWAY

CONST 1999 $ 9630 FED SHARE $ 7704

STATUS: DOT TO FUND ROW & UTILITITES FOR FLOYD PER LETTER 2-15-93

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1926

621920 IS AN ASSOCIATED PROJECT.

OTH SHARE $

FLOYD 621670
STATUS:

SW ROME BYP FM PROP. W ROME BYP @ CR 638 TO SR 1 @ CR 633 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH{Miles/krn): 2.90/4.66610 MANAGER: M. GANNAWAY DOT TO FUND ROW & UTILITIES FOR FLOYD PER LETTER 2-15-93

* ROME TIP S-92-23
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 621920 IS AN ASSOCIATED PROJECT.

PE NONE

$

ROW 1998

$

CONST 1999

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 1836 9275 7420
1855

FLOYD 621890
STATUS:

SR 1/US 27 NBL & SBL @ SILVER CK & SOUTHERN RR IN SW ROME REHABILITATION OF THE EXISTING BRIDGE{S). NO ADDED LANES. LENGTH{Miles/krn): .28/.45052 MANAGER: GREG PARKER ROME SGN DO PUBLIC UTILITIES 8/8/96;FLOYD HAS NO UTILITIES.

* ROME TIP S-95-10
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1998 $ 1261

FED SHARE $ 1009

GA. SHARE $

252

OTH SHARE $

FLOYD 621920
STATUS:

WEST ROME BYP: FM CR 638 N TO CR 268 INCL BR @ COOSA RIVER CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH{Miles/krn): 1.30/2.09170 MANAGER: M. GANNAWAY DOT TO FUND UTILITIES FOR FLOYD PER LETTER 2-15-93

* ROME TIP L-89-10
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 621670 IS AN ASSOCIATED PROJECT.

PE 19.93 UNDERWAY

ROW NONE

$

0

CONST 1999 $ 2588

FED SHARE $ 2070

GA. SHARE $ 518

OTH SHARE $

FLOYD 622000
STATUS:

SR 1/US 27 AT SR 1LP/VETERANS MEM HWY N OF THE CITY OF ROME

INTERSECTION IMPROVEMENT / RECST. OR REHAB.

CONG DIST. 7

LENGTH{Miles/krn): .46/.74014- EXIST. LANES: 6 /PROPOSED LANES: 8

MANAGER: GREG PARKER

FUND SOURCE: HWY. SAFETY

ROME SGN DO ROW & UTIL 1-26-96; OTO

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1997 $ 241

FED SHARE $ 217

GA. SHARE $

24

OTH SHARE $

FLOYD 650410
STATUS:

DIVISION ST/ROME FM SHORTER AVE TO REDMOND RD/& REMOVE RR BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): .90/1.44810 MANAGER: J. GARLAND ROME SGN 4-15-91 R & U SEE REMARKS;CO SGN 4-02-96 ROW & UTIL

ROME TIP # L-85-12 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW LOCL
CONST 1998 $ 2416 FED SHARE $ 1933 GA. SHARE $ 483 OTH SHARE $

FLOYD 650460
STATUS:

SR 101 OVER ETOWAH RIVER IN ROME REPLACEMENT OF THE EXISTING BRIDGES{S). FROM 4 TO 5 LANES. LENGTH(Miles/krn): .37/.59533
MANAGER: D. SMITH CITY OF ROME SIGNED FOR UTILITIES 11-20-95

ROME TIP # L-89-04 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.

PE 1993 UNDERWAY ROW 1998 $ 4459 CONST 1999 $ 4551
FED SHARE $ 3641 GA. SHARE $ 910
OTH SHARE $

Ui!i:'--

- l~'.:

-e-~--:::"'::::'1<>1

~:_--:,. -'::.~<;.~

~:_.<,.,-:~_"0:';: '~-}

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 94

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FLOYD CR 181/0LD SUMMERVILLE RD AT ARMUCHEE CREEK

PE 1996 UNDERWAY

650600 SIGNALS / SAFETY

CONG DIST. 7

ROW LOCL

LENGTH(Miles/km): .10/.16090- EXIST. LANES: 2 /PROPOSED LANES: 4

CONST 1997 $

30

MANAGER: KARL ALFF

FUND SOURCE: HWY. SAFETY

FED SHARE $

27

STATUS: REQ CITY DO ROW, UTIL & DET 3-12-96.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

FLOYD 670820
STATUS:

MAYO'S BAR LOCK AND DAM RESTORATION ON COOSA RIVER
HISTORIC FACILITIES / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: MEG BRYSON TO BE DONE BY CONTRACT

ROME TIP # S-94-15 CONG DIST. 7 0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1997

$

563

FED SHARE $

450

GA. SHARE $

OTH SHARE $

113

FLOYD 671070
STATUS:

CITY OF ROME -"OOSTANAULA RIVER TRAIL"

BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 7

LENGTH(Mi1es/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: MEG BRYSON

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW LOCL

CONST 1997

$

625

FED SHARE $

500

GA. SHARE $

OTH SHARE $

125

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 95

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ----------------P-R-O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

GORDON SR 53 OVER I-75

PE 1992

UNDERWAY

610550

TURN LANES / RECST. OR REHAB.

CONG DIST. 9

LENGTH(Miles/km): .19/.30571- EXIST. LANES: 4 /PROPOSED LANES: 6

MANAGER: M. GANNAWAY

FUND SOURCE: I-STATE MAINT.

ROW 1997

$

CONST 1998

$

FED SHARE $

120 2291 2062

STATUS: CALHOUN SGN DO UTIL 10-25-93;GORDON SGN 10-21-93 UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 229

OTH SHARE $

GORDON 610750
STATUS:

I-75 @ SR 156 IN CALHOUN

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 9

LENGTH(Miles/km): .50/.80450 - EXIST. LANES: 3 /PROPOSED LANES: 5

MANAGER: M. GANNAWAY

FUND SOURCE: I-STATE MAINT.

GORDON SGN P UTL 2/94;CITY SGN P UTIL/REFUSED PVT UTL 2/94

FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1997

$

250

CONST 1998

$ 3298

FED SHARE $ 2968

GA. SHARE $

330

OTH SHARE $

GORDON 610755
STATUS:

I-75 @ SR 225 N OF CALHOUN (INCLUDING I-75 BRIDGE) INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .40/.64360- EXIST. LANES: 6 /PROPOSED
MANAGER: RAY METTS GORDON REF UTIL 11-9-92;CALHOUN SGN FOR P UTIL 2-14-94.

LANES:

CONG DIST. 9 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1997

$

56

CONST 1998

$

788

FED SHARE $

630

GA. SHARE $

158

OTH SHARE $

GORDON 610870
STATUS:

I-75 @ UNION GROVE RD/CR 65 RELOC IN CALHOUN; & 61Y870

INTERCHANGE / NEW CONSTRUCTION

CONG DIST. 9

LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: 3 /PROPOSED LANES: 3

MANAGER: J. GRAYBEAL

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

61Y870 IS AN ASSOCIATED PROJECT.

PE 1999 ROW LOCL CONST

$ 160 AFTER 99

GORDON 610925
STATUS:

I-75 RA 34 ENLARGE RESTROOMS & UPGRADE ADA STANDARDS-PH II REST AREA / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: J. GARLAND NOT APPLICABLE

CONG DIST. 9 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1999 $ 1168

FED SHARE $ 1051

GA. SHARE $ 117

OTH SHARE $

GORDON 610930
STATUS:

I-75 INTERCHANGE @ SR"136 & WIDENING ON SR 136; 61Y930

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 9

LENGTH(Miles/km): .75/1.20675- EXIST. LANES: 6 /PROPOSED LANES: 6

MANAGER: KEVIN HOSEY

FUND SOURCE: SURFACE TRANSPORT.

GORDON REFUSED TO DO UTILITIES 2-28-95

FEDERAL HIGHWAY ADMIN FUNDS

61Y930 IS AN ASSOCIATED PROJECT.

GORDON 611006
STATUS:

I-75 RA 35 ENLARGE RESTROOMS & ADA STANDARDS--PH II

REST AREA / RECST. OR REHAB.

GONG DIST. 9

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: J. GARLAND

FUND SOURCE: I-STATE MAINT.

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW 1997

$

753

CONST 1999 $ 2435

FED SHARE $ 1948

GA. SHARE $ 487

OTH SHARE $

PE NONE $

0

ROW NONE $

0

CONST 1999

$

746

FED SHARE $

671

GA. SHARE $

75

OTH SHARE $

~-:::_":~::!"!'-'

r.t.:Z":.:";:..~~

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 96

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

GORDON I-75 INTERCHANGE @ SR 136 & WIDENING ON SR 136; 610930

PE NONE $

0

61Y930 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 9

LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 6 /PROPOSED LANES: 6

ROW NONE CONST 1999

$

0

$ 1624

MANAGER:

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 1462

STATUS: GORDON REFUSED TO DO UTILITIES 2-28-95

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 162

610930 IS AN ASSOCIATED PROJECT.

OTH SHARE $

GORDON 621510
STATUS:

SR 53 @ CSX RR/FAIRMOUNT REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES. LENGTH(Miles/km): .20/.32180
MANAGER: GREG PARKER CO SGN FOR PUB UTL 11-15-91; FAIRMOUNT SGN UTILITIES 11-4-91

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 19.94

UNDERWAY

CONST 1997

$ 1360

FED SHARE $ 1088

GA. SHARE $ 272

OTH SHARE $

GORDON 621540
STATUS:

SR 53 WB MP 14.67-15.8;EB MP 15.84-16.69;EB MP 18.1-19.37 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 3.25/5.22925 MANAGER: GREG PARKER GORDON COUNTY SIGNED 10-15-91 FOR UTILITITES

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1997

$

95

CONST 1998 $ 1086

FED SHARE $ 869

GA. SHARE $ 217

OTH SHARE $

GORDON 621545
STATUS:

SR 53 @ PINE LOG CREEK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .26/.41834 MANAGER: GREG PARKER REQ GORDON COUNTY DO UTILITIES 6-18-91

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1998 $ 309

FED SHARE $ 247

GA. SHARE $

62

OTH SHARE $

GORDON 631290
STATUS:

SR 136 EB MP 10-11.3; WB MP 12.3-13.6 EAST OF RESACA ADDITION OF A PASSING LANE.
LENGTH(Miles/km): 2.60/4.18340 MANAGER: GREG PARKER GORDON REFUSED TO COMMIT ANY FUNDING 11-25-95

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW CONST

$

50

AFTER 99

AFTER 99

GORDON 631570
STATUS:

SR 225 BRIDGE WIDENING OVER NEW TOWN CREEK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: GREG PARKER GORDON REFUSED TO COMMIT FUNDS 8-10-95.

CONG. DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW CONST

$

9

AFTER 99

AFTER 99

GORDON 632690
STATUS:

SR 61/US 411 AT SR 136 NORTH OF OAKMAN

TURN LANES / SAFETY

LENGTH(Miles/km): .37/.59533- EXIST. LANES: 2 /PROPOSED LANES:

MANAGER: UNKNOWN

GORDON COUNTY SIGNED FOR ROW AND UTIL 6-4-96.

OTO

CONG DIST. 9 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1997 UNDERWAY

ROW LOCL

CONST 1998 $ 277

FED SHARE $ 249

GA. SHARE $

28

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 97

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

GORDON UNION GROVE ROAD/CR 65 RELOCATION FM SR 3 TO SR 53 / CALHOUN

PE 1999 $ 200

662510 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

CONG DIST. 9

ROW LOCL

LENGTH(Miles/km): 3.20/5.14880

CONST

AFTER 99

MANAGER: J. GRAYBEAL

FUND SOURCE: SURFACE TRANSPORT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

GORDON 670940
STATUS:

COOSAWATTEE RIVER TRAIL

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 9

LENGTH(Miles/km): 2.34/3.76506 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: JANET HARVEY

FUND SOURCE: TRANS. ENHANCE.

LGPA TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GORDON 670942
STATUS:

HISTORIC PRESERVATION OF CALHOUN DEPOT AS TRAILHEAD HISTORIC PRESERVATION / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT

LANES:

CONG DIST. 9 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

GORDON 670944
STATUS:

PEDESTRIAN TRAIL IN CALHOUN

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 9

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: JANET HARVEY

FUND SOURCE: TRANS. ENHANCE.

LGPA TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW LOCL

CONST 1997

$

873

FED SHARE $ 698

GA. SHARE $

OTH SHARE $ 175

PE LOCL

ROW LOCL

CONST 1997

$

221

FED SHARE $ 177

GA. SHARE $

OTH SHARE $

44

PE LOCL

ROW LOCL

CONST 1997 $ 157

FED SHARE $ 126

GA. SHARE $

OTH SHARE $

31

'&.

r -

\.::

tt_,

lc,_~~)

, ( ______

'__ rr..-..:--~ ':J

r:?t_

r :_.~-

_.!

-~

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 98

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R- -------E-S-T-S--

HARALSON I-20 SAFETY IMPROVEMENTS FRM ALA STATE LINE TO SR 61/CARROLL

PE NONE $

0

610910 GUARDRAIL / SAFETY

CONG DIST. 7

LENGTH(Miles/km): 22.00/35.39800 - EXIST. LANES: 0 /PROPOSED LANES: 0

ROW NONE $

0

CONST 1997 $ 189

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 189

STATUS: NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

61091X IS AN ASSOCIATED PROJECT.

OTH SHARE $

HARALSON CR 341/CASHTOWN RD FM SR 8/BREMEN N TO MORGAN RD/CR 346 631140 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
LENGTH(Miles/km): 4.36/7.01524 MANAGER: M. GANNAWAY
STATUS: HARALSON SGN DO UTILITIES 9-8-92

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1997

$

296

CONST 1998 $ 5000

FED SHARE $ 4000

GA. SHARE $ 1000

OTH SHARE $

HARALSON SR 8 EB MP 15.8-17.3; CENTER TL MP 14.0-14.9 631170 ADDITION OF A PASSING LANE.
LENGTH(Miles/km): 2.20/3.53980 MANAGER: GREG PARKER STATUS: COUNTY SGN FOR UTIL 9-8-92; BREMEN REFUSED 2-18-92(Y)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY
ROW 1995 UNDERWAY CONST 1997 $ 1422
FED SHARE $ 1138 GA. SHARE $ 284 OTH SHARE $

HARALSON SR 1/US 27 BUS: OVER SOUTHERN RAILROAD IN BUCHANAN 641950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .24/.38616 MANAGER: GREG PARKER STATUS: REQ HARALSON CO DO UTIL 1-19-96. BUCHANAN REF 2-9-96.

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1995 UNDERWAY

ROW 1998 $

11

CONST 1999

$

377

FED SHARE $ 302

GA. SHARE $

75

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

20-Sep-1996 Page 99

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-ST--S--

PAULDING SR 61/DALLAS @ NORFOLK RR & RELOC SR 61 TO TIE SR6BUS/62Y834

PE 1992 UNDERWAY

620834 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.

CONG DIST. 7

ROW 1996 UNDERWAY

LENGTH(Miles/km): .47/.75623 MANAGER: GREG PARKER STATUS: DALLAS SGN FOR UTILITIES 9/30/87;DOT AGREED TO PAY CO UTIL.

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CONST 1997 $ FED SHARE $ GA. SHARE $

1116 893 223

62Y834 IS AN ASSOCIATED PROJECT.

OTH SHARE $

PAULDING SR 61 FM DALLAS NEBO RD/CR 467 TO SR 768/DALLAS BYPASS 621570 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.90/6.27510 MANAGER: J. GARLAND STATUS: PAULDING SGN P UTIL ONLY 4/96;DALLAS SGN P UTIL ONLY 12/95.

ATLANTA TIP # CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 641830 IS AN ASSOCIATED PROJECT.

PE 1997 ROW 1998
CONST

UNDERWAY $ 3500 AFTER 99

PAULDING SR 61/DALLAS @ SOUTHERN RR; TO SHOW 315 FUNDS; SEE 620834 62Y834 BRIDGES / REPLACEMENT
LENGTH(Miles/km): .00/.00000 MANAGER: GREG PARKER STATUS: DOT HELPING WATER AUTHORITY WITH THIS & 7 MORE PROJECTS

PE NONE

$

0

CONG DIST. 7

ROW NONE

$

0

CONST 1997

$

325

FUND SOURCE: NAT'L HIGHWAY

FED SHARE $ 260

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

65

620834 IS AN ASSOCIATED PROJECT.

OTH SHARE $

PAULDING SR 92 AT GRAYS MILL CREEK IN SOUTH HIRAM 631525 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .04/.06436 MANAGER: GREG PARKER STATUS: HIRAM SGN DO UTIL 10/95;DOT AGREED TO PAY PAULDING UTILITY.

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PAULDING SR 61 AT RIDGE ROAD/MULBERRY ROCK RD SOUTH OF DALLAS 631630 TURN LANES / SAFETY
LENGTH(Miles/km): .61/.98149- EXIST. LANES: 2 /PROPOSED MANAGER: GREG PARKER STATUS: REQ PAULDING DO ROW & UTILITIES 8-6-96.

LANES:

CONG DIST. 7 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1997

$ 1372

FED SHARE $ 1098

GA. SHARE $ 274

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1998 $ 306

FED SHARE $ 275

GA. SHARE $

31

OTH SHARE $

PAULDING SR 120 OVER LANE CREEK 2.3 MI SW OF DALLAS 632660 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .40/.64360 MANAGER: GREG PARKER STATUS: PAULDING REFUSED UTILITIES 8-8-96.

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW
CONST

$

10

AFTER 99

AFTER 99

PAULDING SR 92 AT SR 120 CONNECTOR IN HIRAM

641980 TURN LANES / SAFETY

CONG DIST. 7

LENGTH(Miles/km): .45/.72405- EXIST. LANES: 2 /PROPOSED LANES: 5

MANAGER: GREG PARKER

FUND SOURCE: HWY. SAFETY

STATUS: REQ HIRAM DO ROW & UTIL 9-25-94;DOT AGREED TO PAY CO UTIL.

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1994 UNDERWAY

ROW LOCL

CONST 1997 $ 524

FED SHARE $ 472

GA. SHARE $

52

OTH SHARE $

'~. -:"-~''"')

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

COOSA VALLEY

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

PAULDING SR 61 AT SR 120 CONNECTOR 642030 INTERSECTION IMPROVEMENT / SAFETY
LENGTH(Miles/km): .26/.41834- EXIST. LANES: MANAGER: GREG PARKER
STATUS: DOT TO PAY PAULDING UTILITIES 7/18/95.

3 /PROPOSED LANES:

CONG DIST, 7 4
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS

PAULDING CITY OF DALLAS HISTORICAL DISTRICT

670920 SIDEWALKS / ENHANCEMENT

CONG DIST. 7

LENGTH(Miles/km): ,00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: STAN HAMES

FUND SOURCE: TRANS. ENHANCE.

STATUS: LGPA TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 100

FISCAL YEAR

COST ESTS

PE 1994 UNDERWAY ROW LOCL CONST 1998 $ 606
FED SHARE $ 606 GA. SHARE $ OTH SHARE $

PE LOCL

ROW NONE $

0

CONST 1997 $

94

FED SHARE $

75

GA. SHARE $

OTH SHARE $

19

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 101

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

POLK 620645

SR 6 FM OLD CEDARTOWN RD/CR 193 E TO SR 101/ROCKMART; 62R645 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.60/7.40140 MANAGER: RAY METTS

CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT.

PE 1992 UNDERWAY
ROW 1997 $ 4000 CONST 1999 $ 8735
FED SHARE $ 6988

STATUS: REQ POLK CO DO UTIL 10-31-95; ROCKMART REFUSED 12-27-95

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1747

62Y645 IS AN ASSOCIATED PROJECT.

OTH SHARE $

POLK 620647
STATUS:

SR 6 FM CR 154 EASTERLY TO OLD CEDARTOWN RD/CR 193 & 62R647 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.60/7.40140 MANAGER: RAY METTS
POLK SGN UTILITIES 11-28-95; CEDARTOWN SGN PUBLIC UTL 11/95

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1997

$ 3000

CONST 1999 $ 5241

FED SHARE $ 4193

GA. SHARE $ 1048

OTH SHARE $

POLK 621420
STATUS:

SR 113 FM ROCKMART BYP/CR 433 TO TAYLORSVILLE CTY LMT/CR 249 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 5.40/8.68860 MANAGER: M. GANNAWAY CITY SGN 6/91 P UTIL;DOT TO PAY PVT UTIL FOR POLK & ROCKMART

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW 1995 UNDERWAY CONST 1999 $ 10752
FED SHARE $ 8602 GA. SHARE $ 2150 OTH SHARE $

POLK 621470
STATUS:

SR 1/US 27 OVER CEDAR CREEK NEAR CEDARTOWN REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .21/.33789 MANAGER: J. GRAYBEAL POLK REFUSED 9-16-92.

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1997 $ 283

FED SHARE $ 226

GA. SHARE $

57

OTH SHARE $

POLK 621475
STATUS:

SR 1/US 27: BRIDGE OVER CEDAR CREEK TRIBUTARY SE CEDARTOWN REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .02/.03218 MANAGER: J. GRAYBEAL LGPA COVERED BY #621470

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1999

$

133

FED SHARE $ 106

GA. SHARE $

27

OTH SHARE $

POLK 62R645
STATUS:

SR 6 FM OLD CEDARTOWN RD E TO SR 101 FOR ADDL RW -SEE 620645 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .00/.00000 MANAGER: RAY METTS

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 620645 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1998
CONST NONE

UNDERWAY

$ 4345

$

0

POLK 62R647
STATUS:

SR 6 FM CR 154 TO OLD CEDARTOWN RD; FOR ADDL RW - SEE 620647 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .00/.00000 MANAGER:

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1998 CONST NONE

UNDERWAY

$ 3750

$

0

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

COOSA VALLEY

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

POLK 631280
STATUS:

CR 439/LIME BRIDGE ROAD OVER McCURRY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .10/.16090 MANAGER: GREG PARKER POLK COUNTY SGN 7-7-92 ROW, UTILITIES & DETOURS

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

POLK 641880
STATUS:

SR 1 BUS FM THORNTON AVE TO CEDARTOWN BYPASS

TURN LANES / SAFETY

CONG DIST. 7

LENGTH(Miles/km): 1.54/2.47786 - EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: GREG PARKER

FUND SOURCE: HWY. SAFETY

CEDARTOWN REF DO UTIL 6-4-96;POLK SGN FOR UTIL 6-4-96.

FEDERAL HIGHWAY ADMIN FUNDS

POLK 670900
STATUS:

OLD CSX RAILROAD CORRIDOR FROM CEDARTOWN TO ALABAMA BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT

CONG DIST. 7 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

POLK 671072
STATUS:

IRON HORSE RAIL-TRAIL IN CEDARTOWN

BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 7

LENGTH(Miles/km): 2.25/3.62025 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: JANET HARVEY

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 102

FISCAL YEAR

COST ESTS

PE 1993

UNDERWAY

ROW LOCL

CONST 1998

$

215

FED SHARE $ 172

GA. SHARE $

43

OTH SHARE $

PE 1994 ROW 1999 CONST

UNDERWAY $ 250 AFTER 99

PE LOCL

ROW 1997

$

28

CONST 1997

$

407

FED SHARE $

320

GA. SHARE $

OTH SHARE $

87

PE LOCL

ROW LOCL

CONST 1997

$

524

FED SHARE $

419

GA. SHARE $

OTH SHARE $ 105

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 103

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

COOSA VALLEY

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

WALKER CHICKAMAUGA BYP PAVING FM LONGHOLLOW RD TO MCFARLAND &GAP RD

CHATTANOOGA TIP # NPS-97-2

PE NONE $

0

621193 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

CONG DIST. 9

ROW NONE $

0

LENGTH(Miles/km): 3.00/4.82700

CONST 1997 $ 6170

MANAGER: M. GANNAWAY

FUND SOURCE: STATE FUNDS

FED SHARE $ 4628

STATUS: DOT TO PAY ALL UTILITIES 1-27-93.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1543

OTH SHARE $

WALKER 621194
STATUS:

CHICKAMAUGA BYP FM N OF MCFARLAND RD TO US 27 @ SR 2/CATOOSA CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 2.00/3.21800 MANAGER: M. GANNAWAY DOT TO PAY ALL UTILITIES 1-27-93.

CHATTANOOGA TIP t NPS-97-3 CONG DIST. 9
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS 62119X IS AN ASSOCIATED PROJECT.

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 21410 16058 5353

WALKER 641810
STATUS:

SR 1/US 27 FM EXIST 5 LN NEAR CR 215 TO CHICKAMAUGA BYP

CHATTANOOGA TIP # STP-97-4

TURN LANES / SAFETY

CONG DIST. 9

LENGTH(Miles/km): 1.01/1.62509 - EXIST. LANES: 4 /PROPOSED LANES: 5

MANAGER: GREG PARKER

FUND SOURCE: SURFACE TRANSPORT.

COUNTY SGN 2-1-91 UTIL, ROW, DCL

OTO

FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$

734

FED SHARE $ 587

GA. SHARE $ 147

OTH SHARE $

WALKER 650580
STATUS:

SR 1/US 27 RELOCATE INTERS. @ WARTHEN RD/CR 130 IN LAFAYETTE

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 9

LENGTH(Miles/km): .40/.64360- EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: GREG PARKER

FUND SOURCE: HWY. SAFETY

REQ CITY DO ROW, UTIL & DETOURS 3-6-96.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

15

AFTER 99

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA MOUNTAINS REGIONAL DEVELOPMENT CENTER
Banks Dawson Forsyth Franklin Habersham
Hall Hart Lumpkin Rabun Stephens Towns Union White

10 0

10

SCALE IN MILES

GEORGIA MOUNTAINS

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

GEORGIA MOUNTAINS

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

BANKS 11044Y
STATUS:

I-85 SIGN MOD FM SR 211 TO SC STATE LN; & BANKS/FRANKLIN UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: KARL ALFF

CONG DIST. 0 & 0 0
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS 110440 IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 104

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST NONE $

0

GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1997/FY 1999

20-Sep-1996 Page 105

COUNTY P .I. NO.

DESCRIPTION PROJECT DATA

GEORGIA MOUNTAINS REGIONAL DEVELOPMENT COMMISSION

COMMENTS

FISCAL YEAR

COST ESTS

---------------------------------------------------------------------------------------------------------~-------------------------

DAWSON SR 136 AT SHOAL CREEK and BURT CREEK

PE 1997

$

20

142070 BRIDGES / REPLACEMENT

CONG DIST. 9

ROW 1997 $

10

LENGTH(Miles/km): .40/.64360

CONST 1997

$

546

MANAGER: L. OWENS

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $

437

STATUS: REQ DAWSON COUNTY DO UTILITIES 12-7-95

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

109

OTH SHARE $

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

GEORGIA MOUNTAINS

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

FORSYTH 121980
STATUS:

SR 141 FM 0.6 MI NORTH OF FULTON CO LINE TO SR 9 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 6.81/10.95729 MANAGER: B. FERGUSON FORSYTH COUNTY REFUSED 1-8-92.

ATLANTA TIP # CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 106

FISCAL YEAR

COST ESTS

PE 1992 ROW 1997
CONST

UNDERWAY $ 6734 AFTER 99

FORSYTH 132510
STATUS:

SR 53 AT CR 226/CRYSTAL COVE-WESTBROOK ROADS

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 9

LENGTH(Miles/km): .45/.72405- EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: L. OWENS

FUND SOURCE: HWY. SAFETY

FORSYTH SGN FOR ROW & UTILITIES 10-23-95

FEDERAL HIGHWAY ADMIN FUNDS

FORSYTH 132640
STATUS:

SR 141 AT SHARON ROAD SOUTH OF CUMMING

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 9

LENGTH(Miles/km): .27/.43443- EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: L. OWENS

FUND SOURCE: HWY. SAFETY

FORSYTH COUNTY SIGNED FOR ROW, UTIL 11-13-95

OTO

FEDERAL HIGHWAY ADMIN FUNDS

FORSYTH 141605
STATUS:

SR 20/SR 9/CUMMING @ CS 526; & CR 87

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST' 9

LENGTH(Miles/km): .10/.16090- EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: L. OWENS

FUND SOURCE: HWY. SAFETY

COUNTY REFUSED DUE TO COST 9-15-93(N)

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1997

$

890

FED SHARE $ 890

GA. SHARE $

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1998 $

85

FED SHARE $

77

GA. SHARE $

9

OTH SHARE $

PE 1998 ROW LOCL CONST

$

5

AFTER 99

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 107

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

GEORGIA MOUNTAINS

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FRANKLIN I-85 SIGN MOD FM SR 211 TO SC STATE LN; & BANKS/JACKSON

PE NONE

$

0

11044Z UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: KARL ALFF

FUND SOURCE: I-STATE MAINT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

110445 IS AN ASSOCIATED PROJECT.

* FRANKLIN I-85 UPGRADE NB REST AREA 81, PHASE II

110462 REST AREA / RECST. OR REHAB.

CONG DIST. 10

LENGTH(Mi1es/km): .00/.00000 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: J. GARLAND

FUND SOURCE: I-STATE MAINT.

STATUS: NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1997

$

600

FED SHARE $

540

GA. SHARE $

60

OTH SHARE $

FRANKLIN SR 17[@I-85 RECST INTERCHANGE-IM]FM NCL LAVONIA-STEPHENS CL 12Y080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): .00/.00000 MANAGER: M. REYNOLDS
STATUS:

PE NONE $

0

CONG DIST. 10

ROW NONE $

0

CONST 1998

$

500

FUND SOURCE: I-STATE MAINT.

FED SHARE $

450

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

50

122080 IS AN ASSOCIATED PROJECT.

OTH SHARE $

FRANKLIN SR 145 @ NORTH FORK BROAD RIVER NORTH OF CARNESVILLE 141990 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .19/.30571
MANAGER: L. OWENS STATUS: FRANKLIN COUNTY SIGNED FOR UTILITIES 3-24-95

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW 1999 CONST

UNDERWAY

$

20

AFTER 99

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

~--~

1(-~..::..:~;'J

~~)'

\'2:::~-=-""'-I'-1

~)-:'~r..:.::-,.,

cr~-:.:..=_'P

~-c.~_':",'t;')'

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

GEORGIA MOUNTAINS

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

HABERSHA SR 17 FR 3-LANE @ SUTTON MILL CK TO SR 115 122440 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
LENGTH(Miles/km): 1.00/1.60900 MANAGER: L. OWENS
STATUS:

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 108

FISCAL YEAR

COST ESTS

PE 1993
ROW 1999 CONST

UNDERWAY
$ 243 AFTER 99

HABERSHA SR 105 EB MP 6.95-8.0; WB 8.25-9.15 . . . GOES W/122455 122450 ADDITION OF A PASSING LANE.
LENGTH(Miles/km): 2.05/3.29845 MANAGER: L. OWENS STATUS: HABERSHAM SGN DO UTIL 4-15-96;REQ DEMOREST DO P UTIL 3-29-96

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW 1998 CONST

UNDERWAY
$ 252 AFTER 99

HABERSHA SR 105/US 441 B FM MAIN ST NW TO SR 365 [& 1-WAY PAIR] 132100 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1.63/2.62267 MANAGER: L. OWENS STATUS: REQ COUNTY 9-5-90 DO UTIL; CITY/CORNELIA SGN 9/14/90 UTIL.

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1997 CONST

UNDERWAY $ 865 AFTER 99

HABERSHA SR 115@ CHATTHAOOCHEE RIVER 7.5 MI E. OF CLEVELAND/WHITE 13256X REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): 1.00/1.60900 MANAGER: UNKNOWN STATUS:
HABERSHA SR 115 @ YELLOWBANK CREEK 3.7 MILES NW OF DEMOREST 132600 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .10/.16090 MANAGER: L. OWENS STATUS: HABERSHAM COUNTY SIGNED FOR UTILITIES 4-10-95

CONG DIST. 0 & 0 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 132560 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

HABERSHA CR 240/CR 81/LOW GAP RD FM CR 245 TO CR 80/RABUN

171380 MINOR WIDEN & RESURF / RECST. OR REHAB.

CONG DIST. 9

LENGTH(Miles/km): 4.82/7.75538- EXIST. LANES: 1 /PROPOSED LANES: 1

MANAGER: L. OWENS

FUND SOURCE: FED. LANDS

STATUS: NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

17138X IS AN ASSOCIATED PROJECT.

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

PE 1996 UNDERWAY

ROW 1998 $

10

CONST 1999 $ 166

FED SHARE $

133

GA. SHARE $

33

OTH SHARE $

PE 1997 ROW NONE CONST

$

10

$

0

AFTER 99

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 109

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

GEORGIA MOUNTAINS

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

HALL

I-985 SPLIT DIAMOND INTERCHANGE @ SR 13 & SR 53 & CD SYSTEM

PE 1993

UNDERWAY

110400 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 9

ROW 1998

$ 1000

LENGTH(Miles/km): 3.10/4.98790 - EXIST. LANES: 4 /PROPOSED LANES: 4

CONST

AFTER 99

MANAGER: J. GARLAND

FUND SOURCE: NAT'L HIGHWAY

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

HALL 110465
STATUS:

I-985 @ SR 11 1 NB EXIT LOOP & SB EXIT INTERCHANGE / RECST. OR REHAB.

CONG DIST. 9

LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: J. GARLAND

FUND SOURCE: NAT'L HIGHWAY

REQ CO & GAINESVILLE DO UTIL 2-8-96.

FEDERAL HIGHWAY ADMIN FUNDS

HALL 110470
STATUS:

I-985 @ SPOUT SPRINGS ROAD TURN LANES / SAFETY LENGTH(Miles/km): .34/.54706 - EXIST. LANES: 4 /PROPOSED LANES: MANAGER: L. OWENS REQ HALL & FLOWERY BRANCH DO UTILITIES 3-20-96.

CONG DIST. 9 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

HALL 12215X
STATUS:

SR 11/US 129 FM S4 332/JACKSON TO SR 323 ... SEE UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: TONY DUKE

JACKSONCO /PROPOSED LANES:

CONG DIST. 0 & 0 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122150 IS AN ASSOCIATED PROJECT.

HALL 132610
STATUS:

SR 60, WIDEN TO PROVIDE 2-WAY LEFT TURN IN MURRAYVILLE RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. LENGTH(Miles/km): 1.10/1.76990
MANAGER: L. OWENS REQ HALL DO UTILITIES 3-20-96.

CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1997

$

20

ROW 1998

$

61

CONST 1999

$

669

FED SHARE $

535

GA. SHARE $ 134

OTH SHARE $

PE 1996 UNDERWAY

ROW 1997

$

140

CONST 1999

$

439

FED SHARE $

351

GA. SHARE $

88

OTH SHARE $

PE NONE

$

0

ROW NONE $

0

CONST NONE $

0

PE 1997 ROW 1999 CONST

$

60

$ 105

AFTER 99

HALL 132690
STATUS:

SR 11/US 129 AT JIM HOOD ROAD/NOPONE ROAD

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 9

LENGTH(Miles/km): .20/.32180- EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: J. GARLAND

FUND SOURCE: HWY. SAFETY

REQ HALL DO ROW & UTIL 7/11/96.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW LOCL CONST

$

20

AFTER 99

HALL 171060
STATUS:

RESTORE FLOWERY BRANCH RAILROAD DEPOT

HISTORIC FACILITIES / ENHANCEMENT

CONG DIST. 9

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: BRENT COOK

FUND SOURCE: TRANS, ENHANCE.

LGPA TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96, (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW NONE

$

0

CONST 1997

$

250

FED SHARE $ 200

GA. SHARE $

OTH SHARE $

50

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 110

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

GEORGIA MOUNTAINS

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

HALL

CONSTRUCT PEDESTRIAN/BIKE PATH SYSTEM IN GAINESVILLE

PE LOJ:L

171370 BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 9

ROW LOCL

LENGTH(Miles/km): 10.00/16.09000 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1998

$ 1250

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

FED SHARE $ 1000

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

OTH SHARE $

250

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

GEORGIA MOUNTAINS

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

HART 132160
STATUS:

SR 77 FM SR 51 TO SR77C;FM MP 13.72-15.0;WB MP 12.0-17.0 ADDITION OF A PASSING LANE.
LENGTH(Miles/krn): 5.20/8.36680 MANAGER: L. OWENS HART COUNTY SGN 1-12-93 FOR UTILITIES

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

HART 132540
STATUS:

SR 8/US 29 AT HART INDUSTRIAL PARK/GOLF COURSE ROAD
INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/krn): .50/.80450- EXIST. LANES: 3 /PROPOSED
MANAGER: L. OWENS HARTWELL & COUNTY JOINTLY SGN FOR $50K 2-13-96.

LANES:

CONG DIST. 10
4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

HART 141850
STATUS:

SR 51 AT CR 503 AND CR 405

TURN LANES / SAFETY

CONG DIST. 10

LENGTH(Miles/krn): .50/.80450- EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: L. OWENS

FUND SOURCE: HWY. SAFETY

HART COUNTY SIGNED 5-19-94 FOR ROW & UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

HART 170843
STATUS:

C~ 245 @ SHOAL CREEK 6.5 MI NE OF BOWERSVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
LENGTH(Miles/krn): .22/.35398
MANAGER: L. OWENS HART SGN 10-18-93 FOR ROW, UTILITIES & DETOURS

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 111

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1996 UNDERWAY

CONST 1998 $ 2893

FED SHARE $ 2314

GA. SHARE $

579

OTH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1999

$

500

FED SHARE $

450

GA. SHARE $

50

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

787

FED SHARE $ 708

GA. SHARE $

79

OTH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1997

$

481

FED SHARE $ 385

GA. SHARE $

96

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTA'riON

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

GEORGIA MOUNTAINS

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

LUMPKIN 170900
STATUS:

CR 213 OVER WATERS/DICKS CREEK BRIDGES / REPLACEMENT LENGTH(Miles/km): .15/.24135 MANAGER: L. OWENS LUMPKIN SGN 3-19-92 ROW, UTILITIES AND DETOURS.

CONG DIST. 9
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS

LUMPKIN 170910
STATUS:

HIGHTOWER CHURCH ROAD/CR 72 OVER ETOWAH RIVER BY FOREST HWY
BRIDGES / REPLACEMENT LENGTH(Miles/km): .10/.16090 MANAGER: L. OWENS LUMPKIN COUNTY SGN FOR ROW, UTILITIES & DETOURS 5-13-93

CONG DIST. 9
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 112

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW LOCL

CONST 1997

$

126

FED SHARE $ 126

GA. SHARE $

OTH SHARE $

PE 1993 UNDERWAY

ROW LOCL

CONST 1997

$

463

FED SHARE $ 463

GA. SHARE $

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

GEORGIA MOUNTAINS

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

RABUN 171371
STATUS:

PEDESTRIAN TRAIL ALONG TALLULAH FALLS RR AND LANDSCAPING

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 9

LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

RABUN 17138X
STATUS:

CR 140/CR 81/LOW GAP RD FM CR 245 TO CR SO/HABERSHAM MINOR WIDEN & RESURF / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 1 /PROPOSED MANAGER: UNKNOWN

LANES:

CONG DIST. 0 & 0 1
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS 171380 IS AN ASSOCIATED PROJECT.

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 113

FISCAL YEAR

COST ESTS

PE LOCL

ROW LOCL

CONST 1998

$

250

FED SHARE $ 200

GA. SHARE $

OTH SHARE $

50

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY ROC FY 1997/FY 1999

Page 114

COUNTY

DESCRIPTION

GEORGIA MOUNTAINS

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

STEPHENS SR 365/TOCCOA BYP EXT @ SR 17 NEON NEW LOC TO SR 365@CR 311 132440 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
LENGTH(Miles/km): 5.72/9.20348

CONG DIST. 9

PE 1997 ROW CONST

$

50

AFTER 99

AFTER 99

MANAGER: J. HOBBS

FUND SOURCE: SURFACE TRANSPORT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

STEPHENS CR 16/YOW MILL ROAD @ EASTANOLLEE CREEK 1.9 MIN OF AVALON 170833 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
LENGTH(Miles/km): .20/.32180
MANAGER: L. OWENS STATUS: STEPHENS SGN DO ROW, UTILITIES & DETOURS 10-19-93

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1994

UNDERWAY

ROW LOCL

CONST 1997

$

485

FED SHARE $

388

GA. SHARE $

97

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 115

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

GEORGIA MOUNTAINS

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

TOWNS

SR 2/US 76 3 MILES SE/HIAWASSEE @ HIAWASSEE RIVER

PE 1997 UNDERWAY

122230 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 9

ROW 1999 $

6

LENGTH(Miles/km): .50/.80450

CONST

AFTER 99

MANAGER: L. OWENS

FUND SOURCE: BRIDGE PROGRAM

STATUS: TOWNS SGN FOR UTILITIES 8-29-96.

FEDERAL HIGHWAY ADMIN FUNDS

TOWNS 122420
STATUS:

SR 515/US 76 FM CR 207/PINECREST RD TO CR 124 RECONSTRUCTION & WIDENING FROM 3 LANES TO 4 LANES. LENGTH(Miles/km): 2.60/4.18340 MANAGER: L. OWENS
REQ TOWNS COUNTY DO UTILITIES 5/22/96.

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

TOWNS 171372
STATUS:

TRAIL CONNECTING BRASSTOWN BALD, YOUNG HARRIS AND COLLEGE BICYCLE/FED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: TO BE DONE BY CONTRACT

CONG DIST. 9 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW 1997

$

50

CONST 1997

$ 1761

FED SHARE $ 1409

GA. SHARE $ 352

OTH SHARE $

PE LOCL

ROW LOCL

CONST 1998

$

125

FED SHARE $

100

GA. SHARE $

OTH SHARE $

25

l>Lo. --

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

GEORGIA MOUNTAINS

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

WHITE 121740
STATUS:

SR 17 FM S OF SR 356 TON OF SR 75 ALT TURN LANES / RECST. OR REHAB. LENGTH(Miles/km): .35/.56315- EXIST. LANES: 2 /PROPOSED LANES: MANAGER: L. OWENS
WHITE SGN 10/93 IF CITY PAYS;HELEN HAS NO INVOLVED UTILITIES

CONG DIST. 9 3
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS

WHITE 132560
STATUS:

SR 115@ CHATTHAOOCHEE RIV 7,5 MI E. OF CLEVELAND/HABERSHAM REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007
MANAGER: L. OWENS COUNTY SGN 12-6-94 PROVIDING OWNER PAYS AND NOT COUNTY.

WHITE 170881
STATUS:

CS 613/LORELY RD OVER CHATTAHOOCHEE RIVER IN HELEN REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
LENGTH(Miles/km): ,10/.16090 MANAGER: L. OWENS HELEN SGN ROW & UTIL 3-4-93;WHITE NO INVOLVED UTILITIES.

CONG DIST, 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 13256X IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

WHITE 171020
STATUS:

SAUTEE-NACOOCHEE VALLEY GREENWAYS; P.O. REHAB; LANDSCAPING BICYCLE/FED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT

CONG DIST. 9
0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 116

FISCAL YEAR

COST ESTS

PE 1996 UNDERWAY

ROW 1990 UNDERWAY

CONST 1998 $ 392

FED SHARE $ 353

GA. SHARE $

39

OTH SHARE $

PE 1997

$

19

ROW 1998 $

20

CONST 1999

$

818

FED SHARE $ 654

GA. SHARE $ 164

OTH SHARE $

PE 1993 UNDERWAY

ROW LOCL

CONST 1998 $ 306

FED SHARE $ 245

GA. SHARE $

61

OTH SHARE $

PE 1997

$

25

ROW 1997

$

312

CONST 1997

$

375

FED SHARE $ 300

GA. SHARE $

OTH SHARE $

75

HEART OF GEORGIA- ALTAMAHA REGIONAL DEVELOPMENT CENTER
Appling Bleckley Candler Dodge Evans Jeff Davis Laurens Montgomery Pulaski Tattnall Telfair Toombs Treutlen Wayne Wheeler Wilcox

0 SCALE IN MILES

HEART OF GEORGIA- ALTAMAHA

RDc change effective 7~1~96

""''

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

HEART OF GEORGIA - ALTAMAH

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

APPLING 522900
STATUS:

DISTRICT FIVE--UPGRADE GUARDRAIL ON NH SYSTEM @ VARIOUS LOCA

GUARDRAIL / MAINTENANCE

CONG DIST. 1 & 8

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 117

FISCAL YEAR

COST ESTS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

11

FED SHARE $

9

GA. SHARE $

2

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 118

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

HEART OF GEORGIA - ALTAMAH

FISCAL

COST

-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BLECKLEY SR 112: OVER BOLLINGER CREEK; IMPROVE CR 77 FOR DETOUR

PE 1995 UNDERWAY

242160 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 8

ROW 1997 $

10

LENGTH(Miles/km): 2.30/3.70070

CONST 1997

$

939

MANAGER: D. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 751

STATUS: BLECKLEY SGN DO UTIL 3-13-96.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

188

OTH SHARE $

BLECKLEY SR 112: DRAINAGE IMPROVEMENTS FM GUM SWAMP CREEK TO CR 88

242165 MISCELLANEOUS IMPROVEMENTS / RECST. OR REHAB.

CONG DIST. 8

LENGTH(Miles/km): 1.06/1.70554- EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: D. GRIFFITH

FUND SOURCE: SURFACE TRANSPORT.

STATUS: BLECKLEY REF UTILITIES 3-13-96. (Y)

FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 $

10

ROW 1997

$

30

CONST 1997

$

503

FED SHARE $ 402

GA. SHARE $ 101

OTH SHARE $

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

12f._

't>

~'"'-~:;.!

~...:;;: .~~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

HEART OF GEORGIA - ALTAMAH

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

DODGE 221975
STATUS:

NW EASTMAN BYP/SR 841 FM US 341/SR 27 NE TO US 23/SR 87 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 1.90/3.05710 MANAGER: B. FERGUSON

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 119

FISCAL YEAR

COST ESTS

PE 1999 ROW LOCL CONST

$

51

AFTER 99

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 120

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

HEART OF GEORGIA - ALTAMAH

FISCAL

COST

-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

EVANS SR 73/US 301 FM TATTNALL CO LINE TO S CL/CLAXTON

PE 1993 UNDERWAY

522005 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 1

ROW 1996 UNDERWAY

LENGTH(Miles/krn): 6.75/10.86075

CONST 1997 $ 6050

MANAGER: TONY COLLINS

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 4840

STATUS: REQ TATTNALL P UTL 9/91;SGN EVANS 10/91 UTL/CLAXTON 7/93 P.U

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1210

OTH SHARE $

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 121

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

HEART OF GEORGIA - ALTAMAH

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-STS

JEFF DAV SR 19 FM McCLOUD RD/CR 321 TO NORTH OF McCLOUD CIR/CR 146

PE 1993 UNDERWAY

522660 TURN LANES / SAFETY

CONG DIST. 8

ROW 1996 UNDERWAY

LENGTH(Miles/km): .60/.96540- EXIST. LANES: 2 /PROPOSED LANES: 3

CONST 1997 $ 398

MANAGER: TONY COLLINS

FUND SOURCE: HWY. SAFETY

FED SHARE $ 358

STATUS: JEFF DAVIS SIGNED FOR UTILITIES 3-11-93.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

40

OTH SHARE $

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 122

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

HEART OF GEORGIA - ALTAMAH

FISCAL

COST

-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

LAURENS I-16 AT TURKEY CK, PUGHES CK & MERCER CK

PE 1994 UNDERWAY

210660 BRIDGES / RECST. OR REHAB.

CONG DIST. 8

ROW NONE

$

0

LENGTH(Miles/km): 1.00/1.60900

CONST 19"99

$ 2020

MANAGER: KEVIN HOSEY

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 1818

STATUS: REQ LAURENS COUNTY DO UTILITIES 10-5-93

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 202

OTH SHARE $

LAURENS 221540
STATUS:

SR 19 WB MP MP 29.38/W CL DUDLEY TOW/TURKEY CRK/MP 30.73 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 1.35/2.17215 MANAGER: D. GRIFFITH

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW CONST

$

11

AFTER 99

AFTER 99

LAURENS 221810
STATUS:

SR 19/DUBLIN FM MULTI-LN @ INDUSTRIAL BLVD NW TO S-1641&CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 1.91/3.07319 MANAGER: K. FULBRIGHT REQ LAURENS CO 10-11-90;DUBLIN SGN 2/1/91 CITY UTILITIES

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

LAURENS 232005
STATUS:

SR 31/US 319 ACEL-DECEL LANES AT EAST LAURENS SCHOOL

ACCELERATION/DECEL LANE / SAFETY

CONG DIST. 8

LENGTH(Miles/km): .20/.32180- EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: D. GRIFFITH

FUND SOURCE: HWY. SAFETY

REQ LAURENS DO ROW & UTIL 7/11/96.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1997

$

145

CONST 1999

$ 2319

FED SHARE $ 1855

GA. SHARE $

464

OTH SHARE $

PE 1997 ROW 1999 CONST

$

5

$

2

AFTER 99

LAURENS 262570
STATUS:

RELOCATION OF SR 257 ALONG JOINER ST/CS 702 IN MINOR WIDEN & RESURF / RECST. OR REHAB. LENGTH(Miles/km): .30/.48270- EXIST. LANES: 2
MANAGER: D. GRIFFITH REQ CITY OF DUBLIN DO ROW & UTILITIES 10-31-95

DUBLIN /PROPOSED

LANES:

CONG DIST. 8 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

LAURENS 271000
STATUS:

NATHANIEL DRIVE FROM SR 26 TO SR 199 IN EAST DUBLIN RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 3.42/5.50278 MANAGER: D. GRIFFITH REQ COUNTY DO ROW/UTL 11/94; CITY SGN 12-1-94 FOR ROW/UTIL

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1997

$

21

ROW LOCL

CONST 1999

$

504

FED SHARE $

403

GA. SHARE $

101

OTH SHARE $

PE 1995 UNDERWAY

ROW LOCL

CONST 1997

$ 3633

FED SHARE $ 2906

GA. SHARE $

727

OTH SHARE $

a: -~ '

L:.

'..:::

t:_:>::-"-"=.i!

~~!..::':'.";)

GEORGIA DEPARTMENT OF TRANSPORTATION

20-sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 123

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

HEART OF GEORGIA - ALTAMAH

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

MONTGOME SR 292/VIDALIA FM MORN'SIDE TO LOWERY W/RIGHT TURN;WILSON RD

PE 1995 UNDERWAY

550610 TURN LANES / RECST. OR REHAB.

CONG DIST. 1

ROW LOCL

LENGTH(Miles/km): .96/1.54464 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST 1998

$

846

MANAGER: TONY COLLINS STATUS: MONTGOMERY SGN R/U 1/96;TOOMBS SGN 10/95;VIDALIA SGN 10/95.

FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 761

GA. SHARE $

85

55061X IS AN ASSOCIATED PROJECT.

OTH SHARE $

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

HEART OF GEORGIA - ALTAMAH

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

PULASKI 331620
STATUS:

SR 230 @ SOUTH PRONG BIG TUCSAWHATCHEE CRK W/HAWKINSVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .61/.98149 MANAGER: GORDON BROWN PULASKI REFUSED 10-5-92.

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PULASKI 332030
STATUS:

SR 11/US 341 OVER TOWN CREEK NORTH OF HAWKINSVILLE REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 3 LANES. LENGTH(Miles/km): .02/.03218 MANAGER: B. FERGUSON DOT TO PAY 6/4/96;SEE 322170

PULASKI 343000
STATUS:

SR 230 @ BIG CREEK 5.6 MILES WEST OF HAWKINSVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450
MANAGER: GORDON BROWN PULASKI SGN FOR UTILITIES 12-19-94

CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322170 IS AN ASSOCIATED PROJECT.
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 124

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY ROW 1996 UNDERWAY
CONST 1998 $ 1030 FED SHARE $ 824 GA. SHARE $ 206 OTH SHARE $

PE NONE $

0

ROW NONE $

0

CONST 1998 $ 326

FED SHARE $ 261

GA. SHARE $

65

OTH SHARE $

PE 1996 UNDERWAY

ROW 1998

$

34

CONST 1999 $ 1453

FED SHARE $ 1162

GA. SHARE $ 291

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

20-Sep-1996 Page 125

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

HEART OF GEORGIA - ALTAMAR

FISCAL

COST

-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

TATTNALL SR 73/US 301 FM N CL/GLENNVILLE TO EVANS CO LINE 522000 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 7.16/11.52044

CONG DIST. 1

PE 1992 ROW 1996 CONST 1997

UNDERWAY UNDERWAY $ 6792

MANAGER: TONY COLLINS STATUS: SIGNED TATTNALL 6/95 & EVANS 10/91 UTIL; CITY 10-8-91 P.UTIL

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 5434 GA. SHARE $ 1358

OTH SHARE $

TATTNALL SR 30/US 280: OVER THOMAS CREEK NE OF REIDSVILLE 522620 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS STATUS: TATTNALL COUNTY SIGNED FOR UTILITIES 11-14-95

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 UNDERWAY

ROW 1997

$

2

CONST 1998 $ 420

FED SHARE $ 336

GA. SHARE $

84

OTH SHARE $

TATTNALL SR 196 OVER BEARD'S CREEK & LONG COUNTY 541960 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS STATUS: LONG REF UTILITIES 10-5-94;TATTNALL NO UTILTIES 3-20-96.

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 54196X IS AN ASSOCIATED PROJECT.

PE 1994 UNDERWAY

ROW 1997

$

6

CONST 1998 $ 759

FED SHARE $ 607

GA. SHARE $

152

OTH SHARE $

TATTNALL MIDWAY RD/CR 79 @ CEDAR CREEK 2 MI NORTH OF COLLINS 571180 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: TONY COLLINS STATUS: CO SGN FOR ROW, UTIL & DETOURS 2-23-96.

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW LOCL CONST

$

10

AFTER 99

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1997/FY 1999

Page 126

COUNTY

DESCRIPTION

HEART OF GEORGIA - ALTAMAH

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

TELFAIR SR 30/US 280 @ TURNPIKE CREEK 1.2 MI E OF MILAN

PE 1994 UNDERWAY

532560 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 8

ROW 1996 UNDERWAY

LENGTH(Miles/km): .23/.37007

CONST 1997

$

680

MANAGER: TONY COLLINS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

544

STATUS: TELFAIR COUNTY SIGNED FOR UTILITIES 11-16-93

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 136

OTH SHARE $

TELFAIR 542045
STATUS:

SR 149 @ SUGAR CREEK 5 MI SE OF MCRAE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: TONY COLLINS TELFAIR SIGNED FOR UTILITIES 5-16-95

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 ROW 1999 CONST

UNDERWAY

$

11

AFTER 99

TELFAIR 542050
STATUS:

SR 149 @ TURNPIKE CREEK 8 MI SE OF MCRAE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007
MANAGER: TONY COLLINS TELFAIR SGN FOR UTILITIES 5-16-95NLY 5-8-95

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1997 ROW 1999 CONST

UNDERWAY

$

11

AFTER 99

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

HEART OF GEORGIA - ALTAMAH

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

TOOMBS 522320
STATUS:

SR 30 FM MORNINGSIDE TO BROAD FOOT/NOBLE ST (& 1-WAY PAIR) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 2.15/3.45935 MANAGER: J. GRAYBEAL REQ TOOMBS DO PUB UTILILIES 11/93;VIDALIA SGN UTIL 11-15-93

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 127

FISCAL YEAR

COST ESTS

PE 1992 ROW 1997 CONST

UNDERWAY $ 473 AFTER 99

TOOMBS 532400
STATUS:

CR 364/0LD RIVER RD OVER WILLIAMS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225
MANAGER: UNKNOWN TOOMBS SGN DO ROW, UTILITIES AND DETOURS 6-29-92

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TOOMBS 55061X
STATUS:

SR 292 IMPROVE FM WILSON TO LOWERY & TURN LNS;
UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: UNKNOWN

SEE MONTGOMER /PROPOSED LANES:

CONG DIST. 0 & 0 0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 550610 IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.

PE 1995

UNDERWAY

ROW LOCL

CONST 1999

$

345

FED SHARE $ 276

GA. SHARE $

69

OTH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

HEART OF GEORGIA - ALTAMAH

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

TREUTLEN I-16 AT OVERPASS FOR GEORGIA CENTRAL RAILWAY
210610 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): 1.00/1.60900 MANAGER: KEVIN HOSEY
STATUS: TREUTLEN COUNTY SIGNED 12-7-93 FOR UTILITIES

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

TREUTLEN REPLACE GA CENTRAL RR BRIDGE OVER 29 & RELOCATE CR 94 222200 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .40/.64360 MANAGER: D. GRIFFITH STATUS: TREUTLEN SIGNED FOR UTILITIES 6-12-95

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TREUTLEN SR 171 @ THIGPEN MILL CREEK NE/SOPERTON 231140 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .10/.16090 MANAGER: D. GRIFFITH STATUS: COUNTY SIGNED FOR UTILITIES 6-7-94

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TREUTLEN SR 171 @ OHOOPEE RIVER AND OVERFLOW NE/SOPERTON; SEE EMANUEL 23114X REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .10/.16090 MANAGER: UNKNOWN STATUS: SEE 231140

CONG DIST. 0 & 0
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 231145 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 128

FISCAL YEAR

COST ESTS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1998 $ 1257

FED SHARE $ 1131

GA. SHARE $

126

OTH SHARE $

PE 1993 UNDERWAY

ROW 1995 UNDERWAY

CONST 1997

$ 1825

FED SHARE $ 1460

GA. SHARE $ 365

OTH SHARE $

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1998 $ 250

FED SHARE $ 200

GA. SHARE $

50

OTH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

HEART OF GEORGIA - ALTAMAH

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

WHEELER 531250
STATUS:

REPLACE TRUSS SECTION @ OCONEE RIVER ON SR 46 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS LGPA NOT APPLICABLE

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 129

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1999

$

BOO

FED SHARE $

640

GA. SHARE $

160

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 130

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

HEART OF GEORGIA - ALTAMAH

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

WILCOX SR 30/US 280: OVER MILL CREEK WEST OF ROCHELLE

PE 1995 UNDERWAY

422310 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 8

ROW 1998

$

1

LENGTH(Miles/km): 1.00/1.60900

CONST 1999 $ 460

MANAGER: J. SHEFFIELD

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 368

STATUS: WILCOX SGN DO UTIL 12-5-95;NO UTILITY RELOCATION 11-28-95.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

92

OTH SHARE $

WILCOX 431690
STATUS:

SR 30/US 280@ ALAPAHA RIVER TRIB. 0.7 MI W OF PITTS REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: J. SHEFFIELD WILCOX COUNTY SGN TO DO UTILITIES 2-6-96.

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW CONST

$

10

AFTER 99

AFTER 99

WILCOX 431695
STATUS:

SR 30/US 280 @ ALAPAHA RIVER 1.2 MI W OF PITTS REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: J. SHEFFIELD WILCOX SGN DO UTILITIES 2-6-96.

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1998 ROW CONST

$

10

AFTER 99

AFTER 99

~
L
LOWER CHATTAHOOCHEE REGIONAL DEVELOPMENT CENTER
Chattahoochee Clay Harris
Muscogee Quitman Randolph Stewart
Talbot
:
r
~--

L. ---

c __j

"- .__)

Bartletts Forvr,;" Lake
LEE Goat

10 0

10

SCALE IN MILES

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 131

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

LOWER CHATTAHOOCHEE

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-ST-S---

CHATTAHO SR 1 @ HICHITEE CREEK

PE 1990 UNDERWAY

321580 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 2

ROW NONE

$

0

LENGTH(Miles/km): .30/.48270

CONST 1999

$

865

MANAGER: M. REYNOLDS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

692

STATUS: NO UTILITY COST INVOLVED; LGPA NOT APPLICABLE.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

173

OTH SHARE $

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

LOWER CHATTAHOOCHEE

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

CLAY 442710
STATUS:

SR 39 @ CEMOCHECKOBEE CREEK IN FORT GAINES REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: J. SHEFFIELD REQ FT GAINES DO UTIL 3-11-96(Y);CLAY NO INVOLVED UTILITIES.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 132

FISCAL YEAR

COST ESTS

PE 1997 UNDERWAY

ROW 1998

$

2

CONST 1999

$

798

FED SHARE $

638

GA. SHARE $ 160

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 133

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

LOWER CHATTAHOOCHEE

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

HARRIS 332310

SR 1/US 27@ MULBERRY CREEK .7 MIN OF JCT SR 208 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450 MANAGER: GORDON BROWN

CONG DIST. 3 FUND SOURCE: BRIDGE PROGRAM

PE 1996 UNDERWAY

ROW 1998

$

40

CONST 1999

$ 1393

FED SHARE $ 1114

STATUS: HARRIS SGN 12-6-94 FOR UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 279

OTH SHARE $

HARRIS 342780
STATUS:

SR 1/US 27 @ SR 354 IN PINE MOUNTAIN INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .57/.91713- EXIST. LANES: 0 /PROPOSED MANAGER: GORDON BROWN COUNTY SGN 2-12-92 FOR ROW & UTILITIES (OTO PROJECT)

LANES:

CONG DIST. 3 0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW LOCL

CONST 1997

$

631

FED SHARE $

568

GA. SHARE $

63

OTH SHARE $

HARRIS 371220
STATUS:

CR 268/DAVIS LAKE RD@ CRAWFORD CREEK JUST E OF PINE MOUNTAIN
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: GORDON BROWN HARRIS CO SGN ROW, UTILITIES & DETOURS 9-7-93

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW LOCL

CONST 1998

$

388

FED SHARE $

310

GA. SHARE $

78

OTH SHARE $

HARRIS 371456
STATUS:

MOUNTAIN HILL SCHOOLHOUSE @ SR 219 & CR 385

HISTORIC PRESERVATION / ENHANCEMENT

CONG DIST. 3

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: H. SUTHERLAND

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW LOCL

CONST 1997

$

231

FED SHARE $ 185

GA. SHARE $

OTH SHARE $

46

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 134

PROJECT LISTING BY RDC FY 1997IFY 1999

COUNTY

DESCRIPTION

LOWER CHATTAHOOCHEE

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
MUSCOGEE PUBLIC TRANSIT SERVICE FOR COLUMBUS AND MUSCOGEE COUNTY

3D3019 TRANSIT PROJECTS I OPERATIONS

CONG DIST. 3 & 2

FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM

OPERATING 1997

$ 2310

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT

FED SHARE $ 514

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $ 1796

MUSCOGEE TIRE LEAS.,EQUIP.RBLD.,TRANSIT VCH.,OFF.FURN.,TRANS.REBLD.,
3D3020 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS:

CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$ 884

FED SHARE $

707

GA. SHARE $

88

OTH SHARE $

88

MUSCOGEE TIRE LEAS.,EQUIP.REHB.,TRANSIT VCH.,TRUCKS,FUEL BAY,COMP.ASC
3D3023 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: COLUMBUS TRANSIT SYSTEM
MANAGER: STEVE KISH
STATUS:

CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$ 928

FED SHARE $ 742

GA. SHARE $

93

OTH SHARE $

93

MUSCOGEE PUBLIC TRANSIT FOR COLUMBUS AND MACON COUNTY
3D3024 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: COLUMBUS TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:

CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

2310 329
1981

MUSCOGEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
3V7020 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN COLUMBUS MPO AREA MANAGER: STEVE KISH
STATUS:

CONG DIST. 3 & 2

CAPITAL 1997

$

40

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

32

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

4

OTH SHARE $

4

MUSCOGEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 3V7023 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN MUSCOGEE MPO AREA MANAGER: STEVE KISH
STATUS:

CONG DIST. 3 & 2

CAPITAL 1998

$

42

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

34

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

4

OTH SHARE $

4

MUSCOGEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
3V7030 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN COLUMBUS MPO AREA MANAGER: STEVE KISH STATUS:

CONG DIST. 3 & 2

CAPITAL 1999

$

44

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

35

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

5

OTH SHARE $

4

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

LOWER CHATTAHOOCHEE

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

MUSCOGEE TIRE LSNG.,ENG.REBD.,TRNS.RBD.,TRNST VCH.,COMP.ASSC.,FUEL SY 8D0001 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: MANAGER: STEVE KISH STATUS: PLANNING

CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

20-Sep-1996 Page 135

FISCAL YEAR

COST ESTS

CAPITAL 1999

$ 940

FED SHARE $ 752

GA. SHARE $

94

OTH SHARE $

94

MUSCOGEE METRA(COLUMBUS) TRANSIT SVC 8D0002 TRANSIT PROJECTS / OPERATIONS
FUNDS RECIPIENT: METRA (COLUMBUS) MANAGER: STEVE KISH
STATUS:

TRANSIT SERVI

CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1999 $ FED SHARE $ GA. SHARE $ OTH SHARE $

2310 329
1981

MUSCOGEE I-185 BR WDN & CORRECT S CURVE @ CUSSETA RD & SCL RR 311155 BRIDGES / RECST. OR REHAB.
LENGTH(Miles/km): .75/1.20675 MANAGER: KEVIN HOSEY
STATUS: LGPA NOT APPLICABLE

COLUMBUS TIP # 91-ST-2001 CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 311770 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW 1997

$

200

CONST 1998 $ 2541

FED SHARE $ 2287

GA. SHARE $ 254

OTH SHARE $

MUSCOGEE I-185/COLUMBUS FM SR 520 TO ST MARYS RD [EXCEP 0.43 MILE)
311445 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 2.83/4.55347
MANAGER: KEVIN HOSEY STATUS: MUSCOGEE SIGNED 5-9-95 FOR UTILITIES

COLUMBUS TIP # 91-ST-2001 CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 311770 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1998 $ 100

CONST 1999

$ 7656

FED SHARE $ 6125

GA. SHARE $ 1531

OTH SHARE $

MUSCOGEE I-185 INTERCHANGE AT SR 1

COLUMBUS TIP # 91-ST-2001

311630 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 2

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: M. REYNOLDS

FUND SOURCE: I-STATE MAINT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1998 CONST

UNDERWAY $ 2007 AFTER 99

MUSCOGEE I-185 OVER OLD CUSSETA ROAD/CR 62 311770 BRIDGES / RECST. OR REHAB.
LENGTH(Miles/km): 1.00/1.60900 MANAGER: KEVIN HOSEY STATUS: REQ COLUMBUS-MUSCOGEE DO UTILITIES 10-9-95
MUSCOGEE SR 1/US 27/4TH AVE/COLUMBUS OVER C OF GA RR 321810 BRIDGES / RECST. OR REHAB.
LENGTH(Miles/km): .25/.40225 MANAGER: D. CHURCH STATUS: MUSCOGEE COUNTY SIGNED 6/13/90 FOR UTILITIES.

COLUMBUS TIP # 91-st-2001 CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 311155 IS AN ASSOCIATED PROJECT.
COLUMBUS TIP # 86-UD-3001 CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE

$

0

ROW NONE $

0

CONST 1999

$

234

FED SHARE $ 211

GA. SHARE $

23

OTH SHARE $

PE 1992 UNDERWAY

ROW 1998

$ 3048

CONST 1999 $ 4958

FED SHARE $ 3966

GA. SHARE $ 992

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1997/FY 1999

20-Sep-1996 Page 136

COUNTY

DESCRIPTION

LOWER CHATTAHOOCHEE

FISCAL

COST

-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

MUSCOGEE SR 85/US 27A AT FLATROCK ROAD & COUNTY LINE ROAD

COLUMBUS TIP # 95-SR-2001

PE 1995 UNDERWAY

332160 ACCELERATION/DECEL LANE / SAFETY

CONG DIST. 3

ROW NONE $

0

LENGTH(Miles/km): .40/.64360- EXIST. LANES: 4 /PROPOSED LANES: 0

CONST 1999

$

402

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

FED SHARE $ 362

STATUS: MUSCOGEE SGN DO UTILITIES 8-1-96.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

40

OTH SHARE $

MUSCOGEE 13TH STREET BRIDGE OVER CHATTAHOOCHEE RIVER & 35Y260 350260 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 0 TO 4 LANES.
LENGTH(Miles/km): .43/.69187 MANAGER: A. ALEXANDER STATUS: CT REQ CITY INSTALL, MAINTAIN LIGHTING 9/95; NO OTHER UTIL

COLUMBUS TIP # 78-BR-1001 CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 35Y260 IS AN ASSOCIATED PROJECT.

PE 1976 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$ 7854

FED SHARE $ 3927

GA. SHARE $

OTH SHARE $ 3927

MUSCOGEE BUENA VISTA RD-PH II FM ANDREA DR TO SCHATULGA RD 350685 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 1.40/2.25260 MANAGER: A. ALEXANDER STATUS: CO SGN ROW, UTIL 4-27-88 & FOR SIDEWALKS & WALLS 3-5-96

COLUMBUS TIP # 86-SR-2005 CONG DIST. 3 & 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW LOCL

CONST 1998

$ 3918

FED SHARE $ 3134

GA. SHARE $ 409

OTH SHARE $ 375

MUSCOGEE SR 22 SPUR/MACON RD @ AUBURN AVE & BOXWOOD BLVD IN COLUMBUS 350690 INTERSECTION IMPROVEMENT / RECST. OR REHAB.
LENGTH(Miles/km): .25/.40225- EXIST. LANES: 4 /PROPOSED LANES: MANAGER: B. FERGUSON STATUS: MUSCOGEE REQ DO UTILITIES 4-30-96.

COLUMBUS TIP # 86-SR-1001 CONG DIST. 3 & 2
4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1998

$

755

FED SHARE $

604

GA. SHARE $

151

OTH SHARE $

MUSCOGEE FORREST RD FM MACON{+MACON IMPROV} TO WOODRUFF FARM/FLOYD RD 350780 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.14/3.44326
MANAGER: A. ALEXANDER STATUS: COLUMBUS/MUSCOGEE SGN DO UTIL & ACQUIRE ROW 2-15-96.

COLUMBUS TIP # 79-SR-2003 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1999

$ 5784

FED SHARE $ 4627

GA. SHARE $ 1157

OTH SHARE $

MUSCOGEE ST MARYS RD/CS 2108/COLUMBUS FM BUENA VISTA TO ROBIN RD 350790 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): .91/1.46419 MANAGER: BILL MOSKAL STATUS: COLUMBUS/MUSCOGEE SIGNED FOR ROW & UTILITIES 11-20-91.

COLUMBUS TIP # 79-SR-2020 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1999 $ 1763 FED SHARE $ 1410 GA. SHARE $ 353 OTH SHARE $

MUSCOGEE SR 22 SP/MACON RD FM WOODRUFF FARM RD/CR 99 TO SR 22/US 80 350870 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.43/5.51887 MANAGER: D. CHURCH STATUS: MUSCOGEE SGN DO UTILITIES 8-1-96.

COLUMBUS TIP # 93-BR-1002 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1992 UNDERWAY ROW 1998 $ 5034 CONST 1999 $ 6233
FED SHARE $ 4986
GA. SHARE $ 1247 OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 137

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

LOWER CHATTAHOOCHEE

FISCAL

COST

-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

MUSCOGEE SR 22 SP/MACON RD @ BULL CREEK

COLUMBUS TIP # 93-BR-1001

PE 1992

UNDERWAY

350875 REHAB. OF THE EXISTING BRIDGE{S). FROM 2 LANES TO 4 LANES.

CONG DIST. 3

ROW NONE $

0

LENGTH(Miles/km): .02/.03218

CONST 1999

$

489

MANAGER: D. CHURCH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

391

STATUS: MUSCOGEE SIGNED 5-9-95 FOR UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

98

OTH SHARE $

MUSCOGEE SR 22 SP FM REESE RD/CS 2111 TO WOODRUFF FARM RD/CR 99 350880 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1.67/2.68703 MANAGER: D. CHURCH
STATUS: REQ COLUMBUS-MUSCOGEE CONSOLIDATED GOVT DO UTIL 10-31-95

COLUMBUS TIP # 92-SR-2001 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1997

$ 2550

CONST 1999

$ 4887

FED SHARE $ 3910

GA. SHARE $

977

OTH SHARE $

MUSCOGEE SR 22SP AT BROWN AVENUE AND PEACOCK AVENUE

COLUMBUS TIP # 79-SR-2004

351000 INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 3

LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: A. ALEXANDER

FUND SOURCE: HWY. SAFETY

STATUS: CONTACT TRAFFIC OPERATIONS

FEDERAL HIGHWAY ADMIN FUNDS

PE 1997

$

5

ROW LOCL

CONST 1999

$

291

FED SHARE $ 262

GA. SHARE $

29

OTH SHARE $

MUSCOGEE FLAT ROCK RD @ US 80/BEAVER RUN RD; RELOC INT 350' EAST 351060 INTERSECTION IMPROVEMENT / SAFETY
LENGTH(Miles/km): .50/.80450- EXIST. LANES: 2 /PROPOSED
MANAGER: J. LEONI STATUS: COLUMBUS SGN CONTRACT FOR PE, ROW & UTILITIES 10-16-95

LANES:

COLUMBUS TIP # 93-SR-2002 CONG DIST. 3 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996

UNDERWAY

ROW LOCL

CONST 1997

$

528

FED SHARE $

422

GA. SHARE $

106

OTH SHARE $

MUSCOGEE WARM SPRINGS RAIL LINE FOR TRAIL AND TROLLEY IN COLUMBUS

COLUMBUS TIP # 96-0T-2001

371481 RR CORRIDORS / ENHANCEMENT

CONG DIST. 2 & 3

LENGTH(Miles/km): 12.00/19.30800 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW LOCL

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1250 1000
250

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

LOWER CHATTAHOOCHEE

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

QUITMAN 431290
STATUS:

SR 27 OVER TOBANNEE CREEK NORTH OF GEORGETOWN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): 1.00/1.60900 MANAGER: J. SHEFFIELD QUITMAN COUNTY SGN DO UTILITIES 11-15-95

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

QUITMAN 431520
STATUS:

SR 50 REALIGNMENT IN THE CITY OF GEORGETOWN INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .38/.61142- EXIST. LANES: 4 /PROPOSED LANES: MANAGER: J. SHEFFIELD GEORGETOWN SGN DO UTIL 3-25-96;QUITMAN SGN DO UTIL 7-8-96.

CONG DIST. 2 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

QUITMAN 442725
STATUS:

SR 39 @ SOAPSTONE CREEK 5 MI N OF GEORGETOWN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .22/.35398 MANAGER: J. SHEFFIELD QUITMAN SIGNED FOR UTILITIES 5-12-95

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 138

FISCAL YEAR

COST ESTS

PE 1995 UNDERWAY

ROW 1997

$

1

CONST 1998 $ 493

FED SHARE $

394

GA. SHARE $

99

OTH SHARE $

PE 1996 UNDERWAY

ROW 1998

$

182

CONST 1998

$

699

FED SHARE $

629

GA. SHARE $

70

OTH SHARE $

PE 1997 UNDERWAY

ROW 1998 $

2

CONST 1999 $ 581

FED SHARE $ 465

GA. SHARE $

116

OTH SHARE $

~---

-~

~--!..:J

'"'

lA: . . ..J

f.:___ :0

~;::-_' - '- "_]

V~--- . ' d

t? ._ _:;)

L:

COUNTY P. I. NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

LOWER CHATTAHOOCHEE

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

RANDOLPH CR 134 @ GEORGIA & ALABAMA RAILROAD 2 MI SE OF CUTHBERT
471060 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: J. SHEFFIELD
STATUS: RANDOLPH SIGNED 7-7-94 ROW, UTILITIES AND DETOURS

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 139

FISCAL YEAR

COST ESTS

PE 1995 UNDERWAY

ROW LOCL

CONST 1997 $ 530

FED SHARE $

424

GA. SHARE $ 106

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

LOWER CHATTAHOOCHEE

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

STEWART 371260
STATUS:

RESTORE RICHLAND DEPOT; BEDINGFIELD INN; SINGER-MOYE INDIAN
HISTORIC FACILITIES / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: H. SUTHERLAND LGPA TO BE DONE BY CONTRACT

CONG DIST. 2 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 140

FISCAL YEAR

COST ESTS

PE LOCL

ROW NONE $

0

CONST 1997

$

610

FED SHARE $

4BB

GA. SHARE $

OTH SHARE $ 122

~,:_;

i._E_:__ :~

t:::L::...-- ;_;

~J.::>_:._'.'bl

I.:L:::-''7"'--.....J

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

LOWER CHATTAHOOCHEE

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

TALBOT 371280
STATUS:

CR 17/GORMAN ROAD @ CSX RAILROAD N CITY LMT OF TALBOTTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: GORDON BROWN TALBOT SGN ROW/UTL/DETOURS 11/93;CITY SGN 9/93 ROW,UTL,DET'R

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 141

FISCAL YEAR

COST ESTS

PE 1994 UNDERWAY

ROW LOCL

CONST 1998

$

372

FED SHARE $ 298

GA. SHARE $

74

OTH SHARE $

LUMP SUM AREA Projects Applicable Statewide

COUNTY P. I . NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

LUMP SUM AREA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

ALL 1B9001
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 11 COUNTIES IN NORTHEAST GA TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 1B9002
STATUS:

RURAL PUBLIC TRANSIT SERVICES IN 11 COUNTIES/CITIES IN NE GA
TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 1B9003
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 11 COUNTIES/CITIES IN NE GA TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 1C9001
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 1C9002
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 1C9003
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 2B9001
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 22 COUNTIES/CITIES IN E. GA
TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 8 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 142

FISCAL YEAR

COST ESTS

OPERATING 1997

$

398

FED SHARE $ 231

GA. SHARE $

OTH SHARE $

167

OPERATING 1998

$

428

FED SHARE $ 248

GA. SHARE $

OTH SHARE $

180

OPERATING 1999

$

448

FED SHARE $ 260

GA. SHARE $

OTH SHARE $

188

CAPITAL 1997

$ 109

FED SHARE $

87

GA. SHARE $

11

OTH SHARE $

11

CAPITAL 1998

$ 105

FED SHARE $

84

GA. SHARE $

11

OTH SHARE $

11

CAPITAL 1999

$ 116

FED SHARE $

93

GA. SHARE $

12

OTH SHARE $

12

OPERATING 1997

$

905

FED SHARE $

525

GA. SHARE $

OTH SHARE $

380

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 143

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

RURAL PUBLIC TRANSIT SERVICE IN 22 CITIES/COUNTIES IN E. GA.

2B9002 TRANSIT PROJECTS / OPERATIONS

CONG DIST. 8 & 11

FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

OPERATING 1998

$

950

FED SHARE $ 551

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $ 399

ALL 2B9003
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 22 CITIES/COUNTIES IN E. GA. TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 8 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1999

$

996

FED SHARE $ 578

GA. SHARE $

OTH SHARE $ 418

ALL 2C9001
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 8 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$ 456

FED SHARE $

365

GA. SHARE $

46

OTH SHARE $

46

ALL 2C9002
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 8 & 11

CAPITAL 1998

$

97

FUND SOURCE: RURAL TRANSIT

FED SHARE $

78

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

10

OTH SHARE $

10

ALL 2C9003
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC.
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 8 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1999

$ 394

FED SHARE $ 315

GA. SHARE $

39

OTH SHARE $

39

ALL 3B9001
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 14 COUNTIES/CITIES IN W. GA TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRNSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 2 & 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1997

$

560

FED SHARE $ 325

GA. SHARE $

OTH SHARE $ 235

ALL 3B9002
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 14 CITIES/COUNTIES IN W. GA. TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERTORS MANAGER: STEVE KISH

CONG DIST. 2 & 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1998

$

588

FED SHARE $ 341

GA. SHARE $

OTH SHARE $ 247

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

l...:..:'""c!:~/

a&...~~

IP""~./

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 144

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

RURAL PUBLIC TRANSIT SERVICE IN 14 CITIES/COUNTIES IN W. GA.

3B9003 TRANSIT PROJECTS / OPERATIONS

CONG DIST. 2 & 3

FUNDS RECIPIENT: RURAL PUBLIC TRANSIT PROVIDERS

OPERATING 1999

$

618

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE $ 358

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $ 259

ALL 3C9001
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 2 & 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$ 241

FED SHARE $ 193

GA. SHARE $

24

OTH SHARE $

24

ALL 3C9002
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 2 & 3

CAPITAL 1998

$

72

FUND SOURCE: RURAL TRANSIT

FED SHARE $

58

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

7

OTH SHARE $

7

ALL 3C9003
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 2 & 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1999

$ 149

FED SHARE $ 119

GA. SHARE $

15

OTH SHARE $

15

ALL 3V7026
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN MACON MPO AREA MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1999

$

44

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

35

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

4

OTH SHARE $

4

ALL 4B9000
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 12 COUNTIES - S.W. GA. TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 2 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1997 $ 202

FED SHARE $ 117

GA. SHARE $

OTH SHARE $

85

ALL 4B9001
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 12 COUNTIES - S.W. GA. TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 2 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

OPERATING 1998

$

212

FED SHARE $ 123

GA. SHARE $

OTH SHARE $

89

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 145

PROJECT LISTING BY ROC FY 1997IFY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

RURAL PUBLIC TRANSIT SERVICE IN 12 COUNTIES - S.W. GA.

4B9002 TRANSIT PROJECTS I OPERATIONS

CONG DIST. 2 & 8

FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

OPERATING 1999 $ 223

FED SHARE $

129

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

94

ALL 4C9000
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC.
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 2 & 8

CAPITAL 1997

$

43

FUND SOURCE: RURAL TRANSIT

FED SHARE $

34

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

4.

OTH SHARE $

4

ALL 4C9001
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC.
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 2 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$ 151

FED SHARE $ 121

GA. SHARE $

15

OTH SHARE $

15

ALL 4C9002
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC.
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 2 & 8

CAPITAL 1999

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE $

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

2

OTH SHARE $

2

ALL 5B9000
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 7 COUNTIES - S.E. GA
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1997

$

217

FED SHARE $ 126

GA. SHARE $

OTH SHARE $

91

ALL 5B9001
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 7 COUNTIES - S.E. GA.
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1998

$

228

FED SHARE $ 132

GA. SHARE $

OTH SHARE $

96

ALL 5B9002
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 7 COUNTIES - S.E. GA.
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

OPERATING 1999

$

239

FED SHARE $

139

GA. SHARE $

OTH SHARE $

100

:..-)

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997IFY 1999

LUMP SUM AREA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

ALL 5C9000
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 5C9001
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 5C9002
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 6B9000
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 15 COUNTIES - N.W. GA. TRANSIT PROJECTS I OPERATIONS FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 6B9001
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 15 COUNTIES - N.W. GA. TRANSIT PROJECTS I OPERATIONS FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 6B9002
STATUS:

RURAL PUBLIC TRANSIT SERVICE IN 15 COUNTIES - N.W. GA. TRANSIT PROJECTS I OPERATIONS FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 6C9000
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 146

FISCAL YEAR

COST ESTS

CAPITAL 1997

$

70

FED SHARE $

56

GA. SHARE $

7

OTH SHARE $

7

CAPITAL 1998

$ 194

FED SHARE $ 155

GA. SHARE $

19

OTH SHARE $

19

CAPITAL 1999

$

57

FED SHARE $

46

GA. SHARE $

6

OTH SHARE $

6

OPERATING 1997 $ 807 FED SHARE $ 468
GA. SHARE $ OTH SHARE $ 339

OPERATING 1998

$

810

FED SHARE $ 470

GA. SHARE $

OTH SHARE $ 340

OPERATING 1999 $ 828 FED SHARE $ 480 GA. SHARE $
OTH SHARE $ 348

CAPITAL 1997

$

515

FED SHARE $

412

GA. SHARE $

52

OTH SHARE $

52

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997IFY 1999

LUMP SUM AREA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

ALL 6C9001
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 6C9002
STATUS:

VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH

CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 7C9000
STATUS:

TRANSIT VEHICLES TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH

CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 7C9001
STATUS:

TRANSIT VEHICLES TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH

ATLANTA TIP # CONG DIST. 5 & 4
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 7C9002
STATUS:

TRANSIT VEHICLES TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GEORGIA DOT
MANAGER: STEVE KISH

CONG DIST. 5 & 4
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 8B9001
STATUS:

OPERATING ASSISTANCE FOR RURAL PUBLIC TRANSPORTATION
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 8B9002
STATUS:

OPERATING ASSISTANCE FOR RURAL PUBLIC TRANSPORTATION
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 147

FISCAL YEAR

COST ESTS

CAPITAL 1998

$ 357

FED SHARE $

286

GA. SHARE $

36

OTH SHARE $

36

CAPITAL 1999

$ 204

FED SHARE $ 163

GA. SHARE $

20

OTH SHARE $

20

CAPITAL 1997

$ 109

FED SHARE $

87

GA. SHARE $

11

OTH SHARE $

11

CAPITAL 1998

$ 111

FED SHARE $

89

GA. SHARE $

11

OTH SHARE $

11

CAPITAL 1999

$

57

FED SHARE $

46

GA. SHARE $

5

OTH SHARE $

6

OPERATING 1997 $ 200 FED SHARE $ 100
GA. SHARE $
OTH SHARE $ 100

OPERATING 1998 $ 200 FED SHARE $ 100
GA. SHARE $
OTH SHARE $ 100

~~--:....,..

:~. 'J

"Q.)'?:"!:_'__:'~

\f'--.:7".::. __ ~_,.,

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997IFY 1999

LUMP SUM AREA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

ALL 8B9003
STATUS:

OPERATING ASSISTANCE FOR RURAL PUBLIC TRANSPORTATION TRANSIT PROJECTS I OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 8C9000
STATUS:

PURCHASE & LEASING OF INTERCITY BUS COACHES AND SIGNAGE PRG.
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: INTERCITY BUS CARRIERS MANAGER: STEVE KISH

CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 8C9001
STATUS:

CAPITAL FOR RURAL PUBLIC TRANSPORTATION
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 8C9002
STATUS:

CAPITAL FOR RURAL PUBLIC TRANSPORTATION TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 8C9003
STATUS:

CAPITAL FOR RURAL PUBLIC TRANSPORTATION TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH

CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 8C9100
STATUS:

PURCHASE & LEASING OF INTERCITY BUS COACHES TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: INTERCITY BUS CARRIERS
MANAGER: STEVE KISH

CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

ALL 8C9101
STATUS:

PURCHASE & LEASING OF INTERCITY BUS COACHES TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: INTERCITY BUS CARRIERS MANAGER: STEVE KISH

CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 148

FISCAL YEAR

COST ESTS

OPERATING 1999

$

200

FED SHARE $ 100

GA. SHARE $

OTH SHARE $ 100

CAPITAL 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1375 1100
275

CAPITAL 1997

$ 277

FED SHARE $ 222

GA. SHARE $

28

OTH SHARE $

28

CAPITAL 1998

$ 277

FED SHARE $ 222

GA. SHARE $

28

OTH SHARE $

28

CAPITAL 1999

$ 277

FED SHARE $ 222

GA. SHARE $

28

OTH SHARE $

28

CAPITAL 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1360 1088
272

CAPITAL 1999

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1471 1177
294

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 149

PROJECT LISTING BY RDC FY 1997IFY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

8V7001 TRANSIT PROJECTS I CAPITAL

CONG DIST. 99

FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA

CAPITAL 1997

$ 220

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

176

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

22

OTH SHARE $

22

ALL 8V7002
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA
MANAGER: STEVE KISH

CONG DIST. 99

CAPITAL 1997

$ 167

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

134

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

17

OTH SHARE $

17

ALL 8V7003
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA
MANAGER: STEVE KISH

CONG DIST. 99

CAPITAL 1997

$ 320

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

256

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

32

OTH SHARE $

32

ALL 8V7004
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA
MANAGER: STEVE KISH

CONG DIST. 99

CAPITAL 1998

$ 336

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

269

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

34

OTH SHARE $

34

ALL 8V7005
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
MANAGER: STEVE KISH

CONG DIST. 99

CAPITAL 1998

$ 234

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

187

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

21

OTH SHARE $

26

ALL 8V7006
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA
MANAGER: STEVE KISH

CONG DIST. 99

CAPITAL 1998

$ 176

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

141

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

18

OTH SHARE $

18

ALL 8V7007
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA.
MANAGER: STEVE KISH

CONG DIST. 99

CAPITAL 1999

$ 353

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

282

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

35

OTH SHARE $

35

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 150

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

8V7008 TRANSIT PROJECTS / CAPITAL

CONG DIST. 99

FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA

CAPITAL 1999

$ 243

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

194

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

25

OTH SHARE $

24

ALL 8V7009
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH

CONG DIST. 99

CAPITAL 1999

$ 184

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

147

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

19

OTH SHARE $

18

ALL 04M097
STATUS:

LUMP SUM FOR INTERSTATE MAINTENANCE 04M FOR FY 1997

ATLANTA TIP # AR 131J

MINOR WIDEN & RESURF / MAINTENANCE

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 7000 6300 700

ALL 04M098
STATUS:

LUMP SUM MAINT. FOR INTERSTATE MAINTENANCE 04M FOR FY 98 MINOR WIDEN & RESURF / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: L. SEABROOK LGPA NOT APPLICABLE

ATLANTA TIP # AR 131K CONG DIST. 99
0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 25708 23137
2571

ALL 04M099
STATUS:

LUMP SUM MAINT. FOR INTERSTATE MAINTENANCE 04M FOR FY 99
RESURFACE & MAINTENANCE I MAINTENANCE
LENGTH(Miles/km): .001.00000- EXIST. LANES: 0 /PROPOSED
MANAGER: LGPA NOT APPLICABLE

LANES:

ATLANTA TIP # AR 131L CONG DIST. 99 0 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1999

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 15000 13500
1500

ALL 04MB97
STATUS:

LUMP SUM BRIDGE PAINTING 04M FOR FY 97
BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000 MANAGER: LGPA NOT APPLICABLE

ATLANTA TIP # AR 131P CONG.DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 7000 6300
700

ALL 04MB98
STATUS:

LUMP SUM BRIDGE PAINTING 04M FOR FY 98 BRIDGES I MAINTENANCE LENGTH(Mileslkm): .001.00000
MANAGER: LGPA NOT APPLICABLE

ATLANTA TIP # AR 131Q CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 5000 4500
500

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 151

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM BRIDGE PAINTING 04M FOR FY 99

ATLANTA TIP # AR 131R

PE NONE

$

0

04MB99 BRIDGES / MAINTENANCE

CONG DIST. 99

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000

CONST 1999 $ 5000

MANAGER:

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 4500

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 500

OTH SHARE $

ALL 122860
STATUS:

DISTRICT ONE--UPGRADE GUARDRAIL ON NH SYSTEM AT VARIOUS LOCA GUARDRAIL / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: L. SEABROOK

CONG DIST. 9 & 10 0
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$

943

FED SHARE $ 754

GA. SHARE $ 189

OTH SHARE $

ALL 210800
STATUS:

DISTRICT TWO--UPGRADE GUARDRAIL ON "I" SYSTEM @ VARIOUS LOCA

GUARDRAIL / MAINTENANCE

CONG DIST. 3 & 11

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$

179

FED SHARE $ 161

GA. SHARE $

18

OTH SHARE $

ALL 222670
STATUS:

DISTRICT TWO--UPGRADE GUARDRAIL ON NH SYSTEM AT VARIOUS LOCA

GUARDRAIL / MAINTENANCE

CONG DIST. 3 & 11

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$ 2400

FED SHARE $ 1920

GA. SHARE $

480

OTH SHARE $

ALL 311970
STATUS:

DISTRICT 3--UPGRADE GUARDRAIL ON "I" SYSTEM @ VARIOUS LOCAT
GUARDRAIL / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: L. SEABROOK

CONG DIST. 2 & 3 0
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997

$ 2241

FED SHARE $ 2017

GA. SHARE $ 224

OTH SHARE $

ALL 315097
STATUS:

LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 97 MINOR WIDEN & RESURF / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: L. SEABROOK LGPA NOT APPLICABLE

ATLANTA TIP # AR 130B CONG DIST. 99 0 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 12118
9694 2424

ALL 315098
STATUS:

LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 98 MINOR WIDEN & RESURF / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: L. SEABROOK LGPA NOT APPLICABLE

ATLANTA TIP # AR 130C CONG DIST. 99
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE $

ROW NONE

$

CONST 19.98

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 30000
24000 6000

COUNTY P. I. NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

LUMP SUM AREA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

ALL 315099
STATUS:

LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 99 RESURFACE & MAINTENANCE / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: LGPA NOT APPLICABLE

ATLANTA TIP # AR 130D CONG DIST. 99 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

ALL 315U97
STATUS:

LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1997
LIGHTING / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER:

LANES:

CONG DIST. 99 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

ALL 315U98
STATUS:

LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1998
LIGHTING / MAINTENANCE LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED LANES: MANAGER:

CONG DIST. 99 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

ALL 315U99
STATUS:

LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY
LIGHTING / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: MANAGER: UNKNOWN

1999 0 /PROPOSED

LANES:

CONG DIST. 99 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

ALL 322830
STATUS:

DISTRICT THREE--UPGRADE GUARDRAIL ON NH SYSTEM @ VARIOUS GUARDRAIL / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: L. SEABROOK

LOC LANES:

CONG DIST. 2 & 3 0
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS

ALL 33A097
STATUS:

LUMP SUM SAFETY OPTIONAL FOR FY97

ATLANTA TIP # AR 157B

UNKNOWN / SAFETY

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: HWY. SAFETY

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

ALL 33A098
STATUS:

LUMP SUM SAFETY OPTIONAL FOR FY 98

ATLANTA TIP # AR 157C

UNKNOWN / SAFETY

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: HWY. SAFETY

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 152

FISCAL YEAR

COST ESTS

PE NONE $ ROW NONE $ CONST 1999 $
FED SHARE $
GA. SHARE $
OTH SHARE $

0 0 35500 28400 7100

PE NONE

$

0

ROW NONE

$

0

CONST 1997

$

771

FED SHARE $

617

GA. SHARE $

154

OTH SHARE $

PE NONE $

ROW NONE $

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 1000 800 200

PE NONE

$

ROW NONE

$

CONST 1999 $

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 1000 800
200

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$ 1790

FED SHARE $ 1432

GA. SHARE $ 358

OTH SHARE $

PE NONE $

ROW NONE $

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 1000 900 100

PE NONE

$

ROW NONE

$

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 1000
900 100

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 153

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM SAFETY OPTIONAL FOR FY 99

ATLANTA TIP # AR 157D

PE NONE

$

0

33A099 UNKNOWN / SAFETY

CONG DIST. 99

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1999

$ 1000

MANAGER:

FUND SOURCE: HWY. SAFETY

FED SHARE $

900

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 100

OTH SHARE $

ALL 33C097
STATUS:

LUMP SUM MAINTENANCE FOR AREAS POP GT 200,000 FOR FY 97 MINOR WIDEN & RESURF / MAINTENANCE LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED MANAGER: LGPA NOT APPLICABLE

LANES:

ATLANTA TIP # AR 130J CONG DIST. 99 0 FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 7500 6000
1500

ALL 33C098
STATUS:

LUMP SUM MAINTENANCE FOR AREAS POP GT MINOR WIDEN & RESURF / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. MANAGER: LGPA NOT APPLICABLE

200,000 FOR FY 98 LANES: 0 /PROPOSED

LANES:

ATLANTA TIP # AR 130K CONG DIST. 99 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 7500 6000 1500

ALL 33C099
STATUS:

LUMP SUM MAINTENANCE FOR AREAS POP GT 200,000 FOR FY 99

ATLANTA TIP # AR 130L

RESURFACE & MAINTENANCE / MAINTENANCE

CONG DIST. 99

LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE $

CONST 1999 $

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 7500 6000 1500

ALL 33CB97
STATUS:

LUMP SUM BRIDGE PAINTING 33C FOR FY 97
BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000 MANAGER: LGPA NOT APPLICABLE

ATLANTA TIP # AR 131F CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 3750 3000
750

ALL 33CB98
STATUS:

LUMP SUM BRIDGE PAINTING FOR FY 98
BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000 MANAGER: LGPA NOT APPLICABLE

ATLANTA TIP # AR 131G CONG DIST. 99
FUND .SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $'
CONST 1998 $ FED SHARE $ GA. SHARE $ OTH SHARE $

0 0 3750 3000 750

ALL 33D097
STATUS:

LUMP SUM MAINTENANCE FOR ANY AREA FOR FY 97

ATLANTA TIP # AR 130F

MINOR WIDEN & RESURF / MAINTENANCE

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE $

ROW NONE $

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 9500
7600 1900

\L

l;'

t

_:)

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 154

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM MAINTENANCE FOR ANY AREA FOR FY 98

33D098 MINOR WIDEN & RESURF / MAINTENANCE

ATLANTA TIP # AR 130G CONG DIST. 99

PE NONE $

0

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1998 $ 9500

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 7600

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1900

OTH SHARE $

ALL 33D099
STATUS:

LUMP SUM MAINTENANCE FOR AN AREA FY 99

ATLANTA TIP # AR 130H

RESURFACE & MAINTENANCE / MAINTENANCE

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1999 $

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 9500 7600 1900

ALL 33DB97
STATUS:

LUMP SUM BRIDGE PAINTING FOR 33D FOR FY 97 BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000 MANAGER: LGPA NOT APPLICABLE

ATLANTA TIP # AR 131B CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 7000
5600 1400

ALL 33DB98
STATUS:

LUMP SUM BRIDGE PAINTING FOR 33D FOR FY 98 BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000 MANAGER: LGPA NOT APPLICABLE

ATLANTA TIP # AR 131C CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 5000 4000 1000

ALL 33DB99
STATUS:

LUMP SUM BRIDGE PAINTING FOR FY 99 BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000
MANAGER: LGPA NOT APPLICABLE

ATLANTA TIP # AR 131D CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1999

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 5000 4000 1000

ALL 33MS97
STATUS:

LUMP SUM RRX PROTECTION DEVICES 33M FOR FY 97

ATLANTA TIP # AR 153B

RR XING / SAFETY

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: HWY. SAFETY

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 2600 2340 260

ALL 33MS98
STATUS:

LUMP SUM RRX PROTECTION DEVICE FY 98

ATLANTA TIP # AR 153C

RR XING / SAFETY

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: HWY. SAFETY

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE $

ROW NONE

$

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 2600 2340 260

COUNTY P. I. NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

LUMP SUM AREA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

ALL 33MS99
STATUS:

LUMP SUM RRX PROTECTION DEVICES 33MS FOR FY 99

ATLANTA TIP # AR 153D

RR XING / SAFETY

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: HWY. SAFETY

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

ALL 33NS97
STATUS:

LUMP SUM RRX HAZARD ELIMINATION 33N FOR FY 97

ATLANTA TIP # AR 156B

RR XING / SAFETY

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: HWY. SAFETY

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

ALL 33NS98
STATUS:

LUMP SUM RRX HAZARD ELIMINATIO FY 98

ATLANTA TIP # AR 156C

RR XING / SAFETY

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: HWY. SAFETY

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

ALL 33NS99
STATUS:

LUMP SUM RRX HAZARD ELIMINATION FOR FY 99

ATLANTA TIP # AR 156D

RR XING / SAFETY

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: HWY. SAFETY

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

ALL 3AA097
STATUS:

LUMP SUM MAINT. FOR AREA POP BET 5,000-200,000 FOR FY 97

MINOR WIDEN & RESURF / MAINTENANCE

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

ALL 3AA098
STATUS:

LUMP SUM MAINT. FOR AREA BT 5K & 200K. 1998

RESURFACE & MAINTENANCE / MAINTENANCE

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

ALL 3AA099
STATUS:

LUMP SUM MAINT. FOR AREA BT 5K & 200K. FY99

RESURFACE & MAINTENANCE / MAINTENANCE

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 155

FISCAL YEAR

COST ESTS

PE NONE $

ROW NONE $

CONST 1999

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 2600 2340
260

PE NONE $

ROW NONE $

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 2600 2340 260

PE NONE

$

ROW NONE $

CONST 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0
0 2600 2340
260

PE NONE $

ROW NONE $

CONST 1999

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 2600 2340
260

PE NONE $ ROW NONE $ CONST 1997 $
FED SHARE $
GA. SHARE $
OTH SHARE $

0 0 9000 7200 1800

PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $ GA. SHARE $
OTH SHARE $

0
0 7000
5600 1400

PE NONE $

ROW NONE $

CONST 1999

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 7000 5600 1400

~'"-

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 156

PROJECT LISTING BY RDC FY 1997IFY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM BRIDGE PAINTING 3AA FOR FY 97

PE NONE $

0

3AAB97 BRIDGES I MAINTENANCE

CONG DIST. 99

ROW NONE $

0

LENGTH(Mileslkm): .001.00000

CONST 1997 $ 2500

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 2000

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 500

OTH SHARE $

ALL 3AAB98
STATUS:

LUMP SUM BRIDGE PAINTING FOR 3AA FOR FY 98 BRIDGES I MAINTENANCE LENGTH(Mileslkm): .001.00000
MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $
GA. SHARE $
OTH SHARE $

0 0 1500 1200
300

ALL 410670
STATUS:

DISTRICT FOUR--UPGRADE GUARDRAIL ON "I" SYSTEM @ VARIOUS LOC

GUARDRAIL I MAINTENANCE

CONG DIST. 2 & 8

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE 19.96 UNDERWAY

ROW NONE $

0

CONST 1997 $ 418

FED SHARE $

376

GA. SHARE $

42

OTH SHARE $

ALL 422580
STATUS:

DISTRICT 4--UPGRADE GUARDRAIL ON NH SYSTEM @ VARIOUS LOCAT

GUARDRAIL / MAINTENANCE

CONG DIST. 2 & 8

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997 $ 1725

FED SHARE $ 1380

GA. SHARE $ 345

OTH SHARE $

ALL 511330
STATUS:

DISTRICT 5--UPGRADE GUARDRAIL ON "I" SYSTEM @ VARIOUS LOCAT

GUARDRAIL / MAINTENANCE

CONG DIST. 1 & 8

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997 $ 2560

FED SHARE $ 2304

GA. SHARE $ 256

OTH SHARE $

ALL 611160
STATUS:

DISTRICT SIX--UPGRADE GUARDRAIL ON "I" SYSTEM @ VARIOUS LOCA

GUARDRAIL I MAINTENANCE

CONG DIST. 6 & 9

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997 $ 488

FED SHARE $ 439

GA. SHARE $

49

OTH SHARE $

ALL 621980
STATUS:

DISTRICT SIX--UPGRADE GUARDRAIL ON NH SYSTEM AT VARIOUS LOCA

GUARDRAIL / MAINTENANCE

CONG DIST. 6 & 7

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1997 $ 1500

FED SHARE $ 1200

GA. SHARE $ 300

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 157

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

A-PL-L-.I-.-N-O--. -D--IS-T-R--IC-T---?----U-P-G-PRR-A-OD-JEE-C-T-G-U-DA-AR-TDA-R-A-I-L--ON---"-RI"-E-G-SIOY-NS-TA-EL-M--D-E@V-V-EL-AO-RP-IMO-U-ENS-T--LO-CC-OA-MT-M--IS-S-IO-N--------CO-M--M-E-N-T-S--------------------------P-EY-E-A1-R9-9-6-----U-NE-DS-ETR-SW--AY

713650 GUARDRAIL / MAINTENANCE

CONG DIST. 4 & 5

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1997

$ 1056

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE $

950

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 106

OTH SHARE $

ALL 770391
STATUS:

ATMS-LUMP SUM: REMAINDER OF THE METRO ATLANTA SYSTEM

ATLANTA TIP # AR 098B2

SIGNALS / SAFETY

CONG DIST. 5 & 4

LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: DEMONSTRATION PROGRAM

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 19"97

$ 1590

FED SHARE $ 1272

GA. SHARE $ 318

OTH SHARE $

ALL 811020
STATUS:

RURAL IVHS I-85, I-16, I-95, I-75 AND I-20

MISCELLANEOUS IMPROVEMENTS / SAFETY

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: I-STATE MAINT.

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW NONE

$

0

CONST 1997

$ 2310

FED SHARE $ 2310

GA. SHARE $

OTH SHARE $

ALL 811060
STATUS:

REPLACEMENT OF SCALES AT 2 WEIGH STATIONS IN WEIGH STATION / RECST. OR REHAB.
LENGTH(Miles/km): .00/.00000 -EXIST. LANES: MANAGER: JERRY GOSSETT
NOT APPLICABLE

1997 0 /PROPOSED

LANES:

CONG DIST. 99 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1997

$ 3000

FED SHARE $ 2700

GA. SHARE $

300

OTH SHARE $

ALL 811061
STATUS:

REPLACEMENT OF SCALES AT 2 WEIGH STATIONS IN WEIGH STATION / RECST. OR REHAB. LENGTH(Miles/km): ,00/.00000- EXIST. LANES: MANAGER: NOT APPLICABLE

1998 0 /PROPOSED

LANES:

CONG DIST. 99 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE $

0

CONST 1998

$ 3000

FED SHARE $ 2700

GA. SHARE $

300

OTH SHARE $

ALL 811062
STATUS:

REPLACEMENT OF SCALES AT 2 WEIGH STATIONS IN 1999 WEIGH STATION / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: NOT APPLICABLE

CONG DIST. 99 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW NONE

$

0

CONST 1999

$ 3000

FED SHARE $ 2700

GA. SHARE $ 300

OTH SHARE $

ALL 821050
STATUS:

OFF SYSTEM PILE ENCASEMENT PROJECT TO REPAIR 103 BRIDGES BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000 MANAGER: UNKNOWN NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

0 0 1200 960 240

'{;.

L__ - :'

LI_ - .

~- - . ..!

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

20-Sep-1996 Page 158

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

LUMP SUM AREA

FISCAL

COST

-P--.I-.-N--O-. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM TRANSPORTATION PLANNING & MANAGEMENT SYSTEMS

PE 1997

$ 2000

870021 SPECIAL STUDIES / PLANNING

CONG DIST. 99

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE $

0

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

870150 IS AN ASSOCIATED PROJECT.

ALL 870022
STATUS:

LUMP SUM TRANSPORTATION PLANNING & MANAGEMENT SYSTEMS SPECIAL STUDIES / PLANNING LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: LGPA NOT APPLICABLE

LANES:

CONG DIST. 99 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 870155 IS AN ASSOCIATED PROJECT.

PE 1998 ROW NONE CONST NONE

$ 2000

$

0

$

0

ALL 870023
STATUS:

LUMP SUM TRANSPORTATION PLANNING & MANAGEMENT SYSTEMS

SPECIAL STUDIES / PLANNING

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW NONE
CONST NONE

$ 2000

$

0

$

0

ALL 870150
STATUS:

STATEWIDE BRIDGE INVENTORY AND INSPECTION

PRELIMINARY ENGINEERING / MAINTENANCE

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW NONE CONST NONE

$ 1600

$

0

$

0

ALL 870155
STATUS:

STATEWIDE BRIDGE INVENTORY AND INSPECTION

PRELIMINARY ENGINEERING / MAINTENANCE

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW NONE CONST NONE

$ 1600

$

0

$

0

ALL 870160
STATUS:

TRAINING FOR TEA PROJECTS - 1997 PRELIMINARY ENGINEERING / OTHER LENGTH(Miles/km): .00/.00000- EXIST. MANAGER: UNKNOWN NOT APPLICABLE

LANES:

0 /PROPOSED LANES:

CONG DIST. 99 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1997

$

25

ROW NONE

$

0

CONST NONE

$

0

ALL 870165
STATUS:

TRAINING FOR TEA PROJECTS - 1998

PRELIMINARY ENGINEERING / OTHER

CONG DIST. 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: TRANS. ENHANCE.

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1998

$

25

ROW NONE

$

0

CONST NONE

$

0

MCINTOSH TRAIL REGIONAL DEVELOPMENT CENTER
Butts Lamar
Pike Spalding
Upson

I~

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

20-Sep-1996 Page 160

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

MCINTOSH TRAIL

FISCAL

COST

-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BUTTS 332510

SR 16 OVER OCMULGEE RIVER AT JASPER CL(M.L.17.45) REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: KEVIN HOSEY

CONG DIST. 11 FUND SOURCE: BRIDGE PROGRAM

PE 1998 ROW CONST

$

16

AFTER 99

AFTER 99

STATUS: BUTTS SGN DO UTIL 4-15-96;JASPER SGN DO UTIL 4-1-96.

FEDERAL HIGHWAY ADMIN FUNDS

BUTTS

INDIAN SPRINGS HISTORIC HOTEL - PHASE I; ALSO 37Y454

PE LOCL

371454 HISTORIC PRESERVATION / ENHANCEMENT

CONG DIST. 11

ROW LOCL

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1997

$

200

MANAGER: NEAL WILKES

FUND SOURCE: TRANS. ENHANCE.

FED SHARE $

160

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

37Y454 IS AN ASSOCIATED PROJECT.

OTH SHARE $

40

BUTTS

INDIAN SPRINGS HISTORIC HOTEL - PHASE II;

SEE 371454

PE LOCL

37Y454 HISTORIC PRESERVATION / ENHANCEMENT

CONG DIST. 11

ROW LOCL

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1998

$

100

MANAGER: UNKNOWN

FUND SOURCE: TRANS. ENHANCE.

FED SHARE $

80

STATUS: TQ BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

371454 IS AN ASSOCIATED PROJECT.

OTH SHARE $

20

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P. I . NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

MCINTOSH TRAIL

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

LAMAR 31138X
STATUS:

I-75 @ SR 36 FM .5 MI SW/I-75 T0.55 MI NE/I-75 & BR'GE/BUTTS

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

311380 IS AN ASSOCIATED PROJECT.

LAMAR 322530
STATUS:

BARNESVILLE BYP [TRUCK BYP] FM SR 7/US 341 N. TO SR 18/US41 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 1.90/3.05710 MANAGER: J. HOBBS REQ CO DO UTIL 2-13-96, REQ BARNESVILLE DO UTIL 2-13-96.

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 161

FISCAL YEAR

COST ESTS

PE NONE $

0

ROW NONE

$

0

CONST NONE $

0

PE 1999 ROW CONST

$

50

AFTER 99

AFTER 99

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 162

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

MCINTOSH TRAIL

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

PIKE 322100
STATUS:

REALIGN SR 362/WILLIAMSON @ PINE;HARVARD;2ND DIST;WILLIAMSON INTERSECTION IMPROVEMENT / SAFETY
LENGTH(Miles/krn): .50/.80450- EXIST. LANES: 2 /PROPOSED LANES: MANAGER: GORDON BROWN PIKE & WILLIAMSON SGN DO UTILITIES 5-21-90 & 6-7-90.

CONG DIST. 3 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1997

$

5

ROW 1995 UNDERWAY

CONST 1998

$

371

FED SHARE $ 334

GA. SHARE $

37

OTH SHARE $

PIKE 363720
STATUS:

CR 160/ROBERTS QUARTERS ROAD OVER ELKINS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/krn): .50/.80450 MANAGER: GORDON BROWN PIKE COUNTY SIGNED FOR ROW, UTILITIES & DETOURS 1-6-94

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW LOCL

CONST 1998

$

641

FED SHARE $

513

GA. SHARE $

128

OTH SHARE $

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 163

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

MCINTOSH TRAIL

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

SPALDING SR 155 NB MP 11.8/SPALDING-0.25/HENRY;SB MP 1.6-3.1/HENRY 331520 ADDITION OF A PASSING LANE.
LENGTH(Miles/krn): 2.90/4.66610 MANAGER: GORDON BROWN
STATUS: HENRY SGN 5-15-89 FOR UTILITIES; SPALDING REFUSED 2-22-93

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 33152X IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1996 UNDERWAY

CONST 1998

$

988

FED SHARE $ 790

GA. SHARE $

198

OTH SHARE $

SPALDING SR 155 @ TEAMON ROAD/CR 514

331970 TURN LANES / RECST. OR REHAB.

CONG DIST. 3

LENGTH(Miles/krn): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

STATUS: SPALDING SGN DO ROW & UTILITIES 7-23-96.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 UNDERWAY

ROW LOCL

CONST 1999 $ 180

FED SHARE $ 162

GA. SHARE $

18

OTH SHARE $

SPALDING SR 92 OVER MANLEY CREEK @ MP 5.1 NEAR EDWARDS RD 332050 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/krn): .50/.80450 MANAGER: GORDON BROWN STATUS: CO SGN LGPA FOR UTIL 1-16-96.

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1999 CONST

UNDERWAY

$

68

AFTER 99

SPALDING SR 16 @ SR 92 IN GRIFFIN INCL RELOC OF SOLOMON ST 342480 INTERSECTION IMPROVEMENT / SAFETY
LENGTH(Miles/krn): .52/.83668- EXIST. LANES: 5 /PROPOSED LANES:
MANAGER: J. GRAYBEAL STATUS: LETTER/GRIFFIN 9-5-94 UTIL; DOT-ROW 11/92 SEE LTR UTL 7/94

CONG DIST. 3 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

SPALDING SR 3/US 19/GRIFFIN FM SR 92 N/CS 804 N TO N/CR 18 342621 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/krn): 1.52/2.44568 MANAGER: J. GRAYBEAL STATUS: SPALDING SGN DO UTILITIES 9-25-90. OTO PROJECT

CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

SPALDING RESTORE HISTORIC STRUCTURE & CREATE VISITORS CENTER/ GRIFFIN 371230 HISTORIC FACILITIES / ENHANCEMENT
LENGTH(Miles/krn): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: BOB MOORE STATUS: GRIFFIN SIGNED CONTRACT 5-5-95 FOR PE, ROW & UTILITIES

CONG DIST. 3 & 0 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1992 UNDERWAY

ROW 1995 UNDERWAY

CONST 1997

$ 1188

FED SHARE $ 1069

GA. SHARE $

119

OTH SHARE $

PE 1993 UNDERWAY

ROW 1997

$

200

CONST 1998 $ 893

FED SHARE $ 893

GA. SHARE $

OTH SHARE $

PE 1995 UNDERWAY

ROW 1995 UNDERWAY

CONST 1997

$

999

FED SHARE $ 750

GA. SHARE $

OTH SHARE $ 249

ltl

t".

C'

_)

:J

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 164

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

MCINTOSH TRAIL

FISCAL

COST

-P--. -I.-N--O-. ----------------PR--O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

UPSON SR 3/US 19 AT JEFF DAVIS/HARP ROAD IN THOMASTON

PE 1996 UNDERWAY

342790 INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 3

ROW LOCL

LENGTH(Miles/km): .21/.33789 -EXIST. LANES: 4 /PROPOSED LANES: 6

CONST 1997 $ 152

MANAGER: GORDON BROWN

FUND SOURCE: NAT'L HIGHWAY

FED SHARE $ 152

STATUS: UPSON SGN DO ROW & UTIL 4-19-96;THOMASTON NO INVOLVED UTIL.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

OTH SHARE $

UPSON 371205
STATUS:

CR 164/NEW HARMONY RD @ WOLF CK S OF THOMASTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .19/.30571 MANAGER: GORDON BROWN UPSON SGN DO ROW, UTILITIES & DETOURS 11-4-93

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1994 UNDERWAY

ROW LOCL

CONST 1998 $ 375

FED SHARE $ 300

GA. SHARE $

75

OTH SHARE $

MIDDLE FLINT REGIONAL DEVELOPMENT CENTER
Crisp Dooly Macon Marion Schley Sumter Taylor Webster

10

_0________________~10

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

MIDDLE FLINT

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

CRISP 41025X
STATUS:

I-75 FM SR 159 NEAR ASHBURN TO 1-MI S OF CR 117/TURNER &"Y" UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: B. FERGUSON

CONG DIST. 0 & 0 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410250 IS AN ASSOCIATED PROJECT.

CRISP 410260
STATUS:

I-75 FM 1 MILE S OF CR 117 TO DOOLY CO LINE; & 41Y260 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 11.88/19.11492 MANAGER: B. FERGUSON
CORDELE SGN UTILITIES 5-1-92;CRISP NO INVOLVED UTILITIES.

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 41Y260 IS AN ASSOCIATED PROJECT.

CRISP 41Y260
STATUS:

I-75 FM 1 MILE S OF CR 117 TO DOOLY CO LINE-FOR IM; 410260 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): .00/.00000 MANAGER: B. FERGUSON

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 410260 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 165

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

PE 1986 UNDERWAY

ROW 1998 $

50

CONST 1999 $ 6879

FED SHARE $ 5503

GA. SHARE $ 1376

OTH SHARE $

PE 1986 UNDERWAY

ROW NONE

$

0

CONST 1999

$ 4000

FED SHARE $ 3600

GA. SHARE $

400

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 166

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

MIDDLE FLINT

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DOOLY

I-75 WIDEN BRIDGE & RAMPS @ SR 27; SEE 31Y665 FOR IM FUNDS

PE 1999 $

80

311665 BRIDGES / RECST. OR REHAB.

CONG DIST. 2

ROW

AFTER 99

LENGTH(Miles/km): .00/.00000

CONST

AFTER 99

MANAGER: B. FERGUSON

FUND SOURCE: NAT'L HIGHWAY

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

31Y665 IS AN ASSOCIATED PROJECT.

DOOLY 321610
STATUS:

SR 90 @ SANDY MOUNT CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .28/.45052 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88 FOR UTILITIES.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 321616 IS AN ASSOCIATED PROJECT.

PE 1990 UNDERWAY

ROW 1995 UNDERWAY

CONST 1997

$

569

FED SHARE $ 455

GA. SHARE $

114

OTH SHARE $

DOOLY 321614
STATUS:

SR 90 @ LITTLE PENNAHATACHEE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .28/.45052 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88 FOR UTILITIES.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1997

$

16

CONST 1997

$

688

FED SHARE $

550

GA. SHARE $ 138

OTH SHARE $

DOOLY 321616
STATUS:

SR 90 @ TURKEY CREEK TRIBUTARY REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .14/.22526 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88 FOR UTILITIES.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM F-EDERAL HIGHWAY ADMIN FUNDS 321610 IS AN ASSOCIATED PROJECT.

PE NONE $

0

ROW 1996 UNDERWAY

CONST 1997

$

234

FED SHARE $

187

GA. SHARE $

47

OTH SHARE $

DOOLY 371210
STATUS:

CR 25 OVER HOGCRAWL CREEK 9 MI WEST OF UNADILLA--MACON REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: GORDON BROWN DOOLY SIGNED FOR ROW, UTILITIES & DETOURS 10-21-93

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 37121X IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1994 UNDERWAY

ROW LOCL

CONST 1998 $ 480

FED SHARE $ 384

GA. SHARE $

96

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 167

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

MIDDLE FLINT

FISCAL

COST

-P--. -I -.N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

MACON

SR 90 @ SCL RR/SAND CRK IN IDEAL; @ SCL RR S/JCT. SR 195

PE 1992

UNDERWAY

322280 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 2

ROW 1995

UNDERWAY

LENGTH(Miles/km): 1.50/2.41350

CONST 1997

$ 2422

MANAGER: GORDON BROWN

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 1938

STATUS: CO SGN FOR UTIL 9/92; CITY SGN 5/91 FOR UTIL

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

484

OTH SHARE $

MACON 332300
STATUS:

SR 49/0GLETHORPE ROAD @ FLINT RIVER OVERFLOW WEST MONTEZUMA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .24/.38616 MANAGER: GORDON BROWN MACON COUNTY SIGNED 3-16-95 SAYING NO UTILITY COST INVOLVED

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW 1998

$

6

CONST 1999

$ 1072

FED SHARE $

858

GA. SHARE $ 214

OTH SHARE $

MACON CR 25 OVER HOGCRAWL CREEK 9 MI W OF UNADILLA; SEE DOOLY

PE NONE

$

0

37121X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: UNKNOWN

FUND SOURCE: BRIDGE PROGRAM

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

371210 IS AN ASSOCIATED PROJECT.

MACON 371480
STATUS:

RENOVATE MONTEZUMA DEPOT

BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 2

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1998

$

612

FED SHARE $

490

GA. SHARE $

OTH SHARE $

122

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

MIDDLE FLINT

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

MARION 331610
STATUS:

SR 355 @ PINE KNOT CREEK N OF JCT W/ SR137 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .50/.80450 MANAGER: GORDON BROWN MARION COUNTY SGN FOR UTILITIES 2-3-92.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MARION 332280
STATUS:

SR 41/BROAD STREET @ CEN. OF GA. RAILROAD IN BUENA VISTA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .25/.40225
MANAGER: GORDON BROWN REQ CITY DO UTIL 11-14-94; COUNTY REFUSED TO FUND 12-13-94

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MARION 342895
STATUS:

CR 128/DOYLE ROAD@ OOCHEE CREEK 2.3 MIN OF SR 26 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789
MANAGER: GORDON BROWN MARION COUNTY SIGNED ROW, UTILITIES & DETOURS 10-12-93

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MARION 343010
STATUS:

SR 355 OVER JUNIPER CREEK AT TALBOT COUNTY LINE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450 MANAGER: GORDON BROWN TALBOT SGN DO UTIL 12-19-94; MARION REFUSED TO FUND 12-13-94

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 168

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1997

$

28

CONST 1998

$

804

FED SHARE $

643

GA. SHARE $ 161

OTH SHARE $

PE 1997 ROW 1999
CONST

$

12

$ 333

AFTER 99

PE 1994 UNDERWAY

ROW LOCL

CONST 1999 $ 361

FED SHARE $ 289

GA. SHARE $

72

OTH SHARE $

PE 1998 ROW 1999 CONST

$

12

$

57

AFTER 99

"

.. ,

'C "..!..._i:J

-- ~J

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

MIDDLE FLINT

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

SUMTER 322430
STATUS:

SR 27/US 280 EB FM MP 6.7-8.2;WB MP 9.49-8.05
ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2,94/4.73046
MANAGER: GORDON BROWN SUMTER SIGNED FOR UTILITIES 8-8-91.

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 169

FISCAL YEAR

COST ESTS

PE 1992 ROW 1998 CONST

UNDERWAY

$

25

AFTER 99

SUMTER 322690
STATUS:

SR 27 AT SR 49 IN AMERICUS

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 2

LENGTH(Miles/km): .09/.14481 -EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

AMERICUS SIGNED FOR UTILITIES 3-22-95

OTO

FEDERAL HIGHWAY ADMIN FUNDS

SUMTER 350750
STATUS:

SR 377/AMERICUS @ GEORGIA SOUTHWESTERN RR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .38/.61142 MANAGER: GORDON BROWN CITY OF AMERICUS SGN 9-29-92 UTILITIES

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

SUMTER 42198X
STATUS:

SR 49 @ KINCHAFOONEE CRK/SEE TERRELL CO- 421980

UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

421980 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1998

$

101

FED SHARE $

91

GA. SHARE $

10

OTH _SHARE $

PE 1989 UNDERWAY

ROW 1998

$

125

CONST 1999

$

619

FED SHARE $

495

GA. SHARE $ 124

OTH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

MIDDLE GEORGIA REGIONAL DEVELOPMENT CENTER
Baldwin Bibb
Crawford Houston Jasper
Jones Monroe Peach Putnam Twiggs Wilkinson

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 170

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

MIDDLE GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BALDWIN SR 22 FM CR 171 TO NE OF SR 24 SPLIT (EAST 3/4 MILE NEW LOC)

PE 1995 UNDERWAY

222180 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 11

ROW 1998

$ 2272

LENGTH(Mi1es/km): 3.50/5.63150

CONST 1999

$ 7486

MANAGER: B. FERGUSON

FUND SOURCE: NAT'L HIGHWAY

FED SHARE $ 5989

STATUS: BALDWIN REF FOR UTL 9/96(S) ;CITY HAS NO INV UTILITIES 3/96.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1497

OTH SHARE $

BALDWIN 231450
STATUS:

SR 49 FM JUST W. OF ALLEN MEMORIAL RD TO MILLEDGEVILLE BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.20/3.53980 MANAGER: M. REYNOLDS

CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW CONST

$ 140 AFTER 99 AFTER 99

BALDWIN 242290
STATUS:

CR 470/PANCRAS ROAD @ CAMP CREEK 6 MI SW OF MILLEDGEVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: D. GRIFFITH BALDWIN SGN FOR ROW, UTILITIES & DETOURS 10-4-94

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW LOCL

CONST 1999

$

254

FED SHARE $ 203

GA. SHARE $

51

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

MIDDLE GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

20-Sep-1996 Page 171

FISCAL YEAR

COST ESTS

BIBB 3D3021
STATUS:

PURCHASE 1 BUS AND P/U TRUCK TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MACON-BIBB TRANSIT AUTHORITY MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1997

$ 198

FUND SOURCE: NON FEDERAL TRANSIT

FED SHARE $

99

GA. SHARE $

OTH SHARE $

99

BIBB 3D3022
STATUS:

ADMIN.VAN(1) AND STORAGE TANKS TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MACON-BIBB TRANSIT AUTHORITY MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1998

$ 175

FUND SOURCE: NON FEDERAL TRANSIT

FED SHARE $

GA. SHARE $

88

OTH SHARE $

88

BIBB 3D3100
STATUS:

PURCHASE 1 BUS AND VIDEO CAMERA & EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MACON-BIBB TRANSIT AUTHORITY MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1999

$ 182

FUND SOURCE: NON FEDERAL TRANSIT

FED SHARE $

GA. SHARE $

91

OTH SHARE $

91

BIBB 3V7004
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN BIBB MPO AREA
MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1997

$

40

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

32

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

4

OTH SHARE $

4

BIBB 3V7021
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN BIBB MPO AREA MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1998

$

42

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

34

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

4

OTH SHARE $

4

BIBB 310713
STATUS:

I-75 @ I-16; SOU RR; ARKWRIGHT RD; US 23 & SR 87; & 31Y713 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): 7.30/11.74570 MANAGER: B. FERGUSON LGPA NOT APPLICABLE

MACON TIP # MCN-14 CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 31Y713 IS AN ASSOCIATED PROJECT.

PE NONE $ ROW NONE $ CONST 1999 $
FED SHARE $ GA. SHARE $
OTH SHARE $

0
0 2385 1908
477

BIBB 310980
STATUS:

I-16 @ SR 540 INCL I-16 ML BR @ SAL RR; 1 STREAM & 1 RIVER

MACON TIP # MCN-11

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 8

LENGTH(Miles/km): .97/1.56073 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: A. ALEXANDER

FUND SOURCE: NAT'L HIGHWAY

LGPA SIGNED BY CO 4-16-85 FOR UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1987 UNDERWAY ROW 1989 UNDERWAY CONST 1999 $ 30284
FED SHARE $ 24227 GA. SHARE $ 6057 OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 172

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

MIDDLE GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BIBB

I-16 IN MACON, FM SR 11 EAST TO SR 87 INCLUDE BRIDGES;31YOOO

MACON TIP # MCN-10

PE 1987

UNDERWAY

311000

RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Mi1es/km): 1.27/2.04343 MANAGER: A. ALEXANDER

CONG DIST. 2 FUND SOURCE: NAT'L HIGHWAY

ROW 1998 CONST

$ 6350 AFTER 99

STATUS: REV REQ MACON DO UTILITIES 11-17-95

FEDERAL HIGHWAY ADMIN FUNDS

31YOOO IS AN ASSOCIATED PROJECT.

BIBB 311400
STATUS:

I-75/MACON FM CR 478 EAST TO I-16 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Mi1es/km): .00/.00000 MANAGER: A. ALEXANDER

MACON TIP # MCN-13 CONG DIST. 8 & 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 31Y400 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1998 CONST

UNDERWAY $ 20700 AFTER 99

BIBB 311460
STATUS:

I-75 @ HARTLEY BRIDGE RD/CR 740

MACON TIP # MCN-1

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 8

LENGTH(Mi1es/km): 1.00/1.60900 - EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: A. ALEXANDER

FUND SOURCE: I-STATE MAINT.

COUNTY SGN CT FOR CONCEPT REPORT & UTIL 2-9-96.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1998

$ 5000

CONST 1999

$ 2500

FED SHARE $ 2250

GA. SHARE $ 250

OTH SHARE $

BIBB 311560
STATUS:

I-75 @ HARDEMAN AVE, FORSYTH ST & GEORGIA AVE

MACON TIP # MCN-4

TURN LANES / SAFETY

CONG DIST. 2

LENGTH(Mi1es/km): .75/1.20675- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: A. ALEXANDER

FUND SOURCE: I-STATE MAINT.

REQ BIBB DO UTILITIES & CITY/MACON PUBLIC UTIL 1-23-95

FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW 1997

$ 1000

CONST 1998

$ 3804

FED SHARE $ 3424

GA. SHARE $

380

OTH SHARE $

BIBB 311910
STATUS:

I-75 NEW INTERCHANGE AT SARDIS CHURCH RD INTERCHANGE / NEW CONSTRUCTION LENGTH(Mi1es/km): .20/.32180- EXIST. LANES: MANAGER: A. ALEXANDER

0 /PROPOSED LANES:

MACON TIP # MCN-15 CONG DIST. 8
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW LOCL CONST

$ 100 AFTER 99

BIBB 31Y000
STATUS:

I-16 IN MACON, FM SR 11 EAST TO SR 87 -FOR IM $; SEE 311000 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Mi1es/km): .00/.00000 MANAGER: A. ALEXANDER

MACON TIP # MCN-2 CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 311000 IS AN ASSOCIATED PROJECT.

BIBB 31Y713
STATUS:

I-75 @ 5 BRIDGES; FOR IM FUNDING; SEE 310713

MACON TIP # MCN-5

UNKNOWN / RECST. OR REHAB.

CONG DIST. 8

LENGTH(Mi1es/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: B. FERGUSON

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

310713 IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1987 ROW 1998 CONST

UNDERWAY

$

0

AFTER 99

PE NONE

$

0

ROW NONE

$

0

CONST 1999

$

300

FED SHARE $ 270

GA. SHARE $

30

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 173

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

MIDDLE GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BIBB

MILLERFIELD RD/CS 83/MACON FM JEFFERSONVILLE TO NEW CLINTON

MACON TIP # MCN-36

PE 1996 UNDERWAY

342080 INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 2

ROW LOCL

LENGTH(Miles/km): .75/1.20675- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. CHURCH

FUND SOURCE: HWY. SAFETY

CONST 1999 $ 1300 FED SHARE $ 1170

STATUS: CO SGN CT DO PE, ROW, UTIL 3-20-96.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 130

OTH SHARE $

BIBB 350820
STATUS:

HOUSTON RD FM WALDEN/SARDIS CH RDS TO SR 11 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 3.20/5.14880 MANAGER: J. LEONI BIBB COUNTY SIGNED CONTRACT 8-2-95 FOR PE, ROW, UTIL & MAINT

MACON TIP # MCN-23 CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1998 $ 4837

FED SHARE $ 3870

GA. SHARE $

967

OTH SHARE $

BIBB 350960
STATUS:

SR 74 FM W OF I-475 W/TRN LNES TO E OF LOG CABIN DR/SR 74 SP

MACON TIP # MCN-40

TURN LANES / RECST. OR REHAB.

CONG DIST. 8 & 2

LENGTH(Miles/km): 1.30/2.09170 - EXIST. LANES: 4 /PROPOSED LANES: 5

MANAGER: A. ALEXANDER

FUND SOURCE: SURFACE TRANSPORT.

BIBB SGN DO UTILITIES 2-22-96;MACON HAS NO INVOLVED UTIL.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1997 $ 1038

CONST 1998 $ 3847

FED SHARE $ 3078

GA. SHARE $

769

OTH SHARE $

BIBB 351080
STATUS:

JEFFERSONVILLE RD FM MILLERFIELD RD TO FALL LINE FWY/US 80 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 1.20/1.93080 MANAGER: D. CHURCH COUNTY SGN CT FOR PE, UTIL & ROW 2-9-96.

MACON TIP # MCN-28 CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY ROW LOCL
CONST 1999 $ 4480 FED SHARE $ 3584 GA. SHARE $ 896 OTH SHARE $

BIBB 351160
STATUS:

CR 73/WESLEYAN DR FM RIVOLI DR TO NORTHSIDE DR/CR 79 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. LENGTH(Miles/km): 1.76/2.83184 MANAGER: A. ALEXANDER CO SGN CT FOR PE, ROW, UTIL 1-18-96.

MACON TIP # MCN-33 CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW LOCL CONST

$

10

AFTER 99

BIBB 371030
STATUS:

LANDSCAPING OF CIVIC SQUARE FOR PARK IN MACON

MACON TIP # MCN-43

LANDSCAPING / ENHANCEMENT

CONG DIST. 2 & 8

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: CORA COOK

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

BIBB 371420
STATUS:

UPGRADE DOWNTOWN TRAFFIC SIGNALIZATION

MACON TIP # MCN-41

SIGNALS / SAFETY

CONG DIST. 2

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: KARL ALFF

FUND SOURCE: HWY. SAFETY

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW LOCL

CONST 1997

$

300

FED SHARE $

240

GA. SHARE $

OTH SHARE $

60

PE 1997 ROW LOCL CONST

$

10

AFTER 99

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

MIDDLE GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

BIBB 371450
STATUS:

CITY OF MACON STREETSCAPE

MACON TIP # MCN-44

BICYCLE/PED. FACILITY / ENHANCEMENT

CONG DIST. 2

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: CORA COOK

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

BIBB 371452
STATUS:

CITY OF MACON HISTORIC HAY HOUSE & GROUNDS

MACON TIP # MCN-45

H!STORIC PRESERVATION / ENHANCEMENT

CONG DIST. 2

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: CORA COOK

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 174

FISCAL YEAR

COST ESTS

PE LOCL

ROW LOCL

CONST 1997

$

600

FED SHARE $

480

GA. SHARE $

OTH SHARE $ 120

PE LOCL

ROW LOCL

CONST 1997

$

558

FED SHARE $

446

GA. SHARE $

OTH SHARE $ 112

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 175

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

MIDDLE GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

HOUSTON ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

3V7019 TRANSIT PROJECTS / CAPITAL

CONG DIST. 8 & 2

FUNDS RECIPIENT: AGENCIES IN W. ROBINS MPO AREA

CAPITAL 1997

$

30

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

24

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

HOUSTON 3V7022
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN W. ROBINS MPO AREA MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1998

$

31

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

HOUSTON 3V7029
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN W. ROBINS MPO AREA MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1999

$

33

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

4

OTH SHARE $

3

HOUSTON SR 96 FM I-75 TO CR 540/0LD HAWKINSVILLE RD/PEACH COUNTY

W. ROBINS TIP # 1993(6)

32245X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

PE NONE $

0

ROW NONE

$

0

CONST NONE $

0

MANAGER: UNKNOWN

FUND SOURCE: SURFACE TRANSPORT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

322450 IS AN ASSOCIATED PROJECT.

HOUSTON 322560
STATUS:

I-75 AT NEW SOUTHWEST PERRY PARKWAY {BYPASS}

INTERCHANGE / NEW CONSTRUCTION

CONG DIST. 2 & 8

LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: 0 /PROPOSED LANES: 4

MANAGER: J. GARLAND

FUND SOURCE: NAT'L HIGHWAY

HOUSTON COUNTY SIGNED 9-1-92 FOR UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY
ROW 1996 UNDERWAY CONST 1998 $ 6236
FED SHARE $ 4989 GA. SHARE $ 1247 OTH SHARE $

HOUSTON 322570
STATUS:

SW PERRY PARKWAY {BYPASS} FM SR 127 SE TO LIMEROCK ROAD/GIP CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
LENGTH(Miles/km): 3.80/6.11420
MANAGER: J. GARLAND HOUSTON SGN ROW & UTIL 9-1-92;PERRY NO INVOLVED UTILITIES.

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY
ROW LOCL
CONST 1998 $ 5232 FED SHARE $ 4186 GA. SHARE $ 1046 OTH SHARE $

HOUSTON 331860
STATUS:

SR 127 FM EAST OF JOY LAKE RD TO CR 279/BEAR BRANCH RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.65/4.26385 MANAGER: RAY METTS HOUSTON SGN DO UTILITIES 6-20-96.

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1998
CONST

UNDERWAY $ 1832 AFTER 99

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

st.~--~

~~::.'::-'.:"

~.:i:f_:-:-,.J

t,.:!::...A_" ~.-J

~.r;<

COUNTY P. I. NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

MIDDLE GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

HOUSTON 342340
STATUS:

SR 247C FM HOUSTON LAKE RD TO SR 247/INCL INTER. IMPROVEMENT

W. ROBINS TIP # 1985-06

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 8 & 2

LENGTH(Miles/km): 4.80/7.72320 -EXIST. LANES: 5 /PROPOSED LANES: 5

MANAGER: J. LEONI

FUND SOURCE: HWY. SAFETY

SGN ROW & UTILITIES 5/18/88 - OTO PROJECT

FEDERAL HIGHWAY ADMIN FUNDS

HOUSTON 350840
STATUS:

HOUSTON LAKE RD/CR 535 FM SR 96 TO RICHARD RUSSELL PKWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 2.81/4.52129 MANAGER: B. FERGUSON REV REQ CO DO ROW/UTIL/CST FOR C&G & DRAIN. CITY SGN 10/92

W. ROBINS TIP # 1991-2 CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

HOUSTON 351070
STATUS:

CR 156/MOODY ROAD @ BAY GALL CREEK/WARNER ROBINS - SOUTHSIDE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .31/.49879 MANAGER: GORDON BROWN WARNER ROBINS SGN DO ROW, UTIL & DETOURS 7-10-95

W. ROBINS TIP # 1996(1) CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 176.

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW LOCL

CONST 1998 $ 650

FED SHARE $ 585

GA. SHARE $

65

OTH SHARE $

PE 1992 UNDERWAY ROW LOCL
CONST 1999 $ 8588 FED SHARE $ 6870 GA. SHARE $ 902 OTH SHARE $ 816

PE 1997 UNDERWAY ROW LOCL
CONST 1999 $ 564 FED SHARE $ 451 GA. SHARE $ 113 OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 177

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

MIDDLE GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

JASPER SR 16 @ SR 212 EAST OF MONTICELLO

PE 1994 UNDERWAY

231520 INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 11

LENGTH{Miles/km): .37/.59533 -EXIST. LANES: 2 /PROPOSED LANES: 3

ROW 1997

$

7

CONST 1998

$

482

MANAGER: D. GRIFFITH STATUS: REQ JASPER DO UTIL 3-4-94; MONTICELLO SGN 3-14-94 UTIL

FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 434

GA. SHARE $

48

OTH SHARE $

JASPER 270815
STATUS:

CR 131/FH 21 @ STALKING HEAD CREEK BRIDGES / REPLACEMENT LENGTH{Miles/km): .20/.32180 MANAGER: D. GRIFFITH CO SGN ROW & UTIL 2-8-96.

CONG DIST. 11
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS

PE 1997

$

5

ROW LOCL

CONST 1998 $

90

FED SHARE $

90

GA. SHARE $

OTH SHARE $

JASPER 271110
STATUS:

CR 141/FH 50/RIVER RD @ KINNARD, LONG&CROW CKS & 2 UNNAMED BRIDGES / REPLACEMENT LENGTH{Miles/km): .50/.80450 MANAGER: D. GRIFFITH JASPER SIGNED FOR ROW, UTILITIES & DETOURS 10-2-95

CONG DIST. 11
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY ROW LOCL
CONST 1999 $ 485 FED SHARE $ 485 GA. SHARE $ OTH SHARE $

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

MIDDLE GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

JONES 24230X
STATUS:

SR WESTBOUND FROM MP 24.83/JONES TO 1.28 WILKINSON UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: D. GRIFFITH

CONG DIST. 0 & 0 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 242300 IS AN ASSOCIATED PROJECT.

JONES 331850
STATUS:

SR 18 EB MP 14.85-16.1; WB MP 17.14-18.7; EB MP 21.39-22.59 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 4.01/6.45209 MANAGER: GORDON BROWN REQ EATONTON DO P UTL 9/92;JONES REF 4/96(S);GRAY SGN 2/95.

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 178

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

PE 1993 UNDERWAY

ROW 1997

$

39

CONST 1998

$ 2312

FED SHARE $ 1850

GA. SHARE $

462

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 179

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

MIDDLE GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA---------R--EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

MONROE I-75 UPGRADE REST AREA #22, PHASE II

PE 1994

UNDERWAY

311617 REST AREA / RECST. OR REHAB.

CONG DIST. 3

ROW 1996 UNDERWAY

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1997 $ 1200

MANAGER: J. GARLAND

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 1080

STATUS: NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 120

OTH SHARE $

MONROE 311740
STATUS:

SR 408/I-475 NBL @ I-75; ADD ONE LANE & REPL BRIDGE DECK BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .25/.40225 MANAGER: K. FULBRIGHT MONROE SGN FOR UTILITIES 2-10-95; NO UTIL INVOLVED 12-12-94

CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW 1997 $

20

CONST 1998

$

430

FED SHARE $ 387

GA. SHARE $

43

OTH SHARE $

MONROE 322360
STATUS:

SR 83 FM S/CR 125/HUBBARD DR NE TO SR 18/US 41 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. LENGTH(Miles/km): 1.00/1.60900 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1999 CONST

UNDERWAY
$ 225 AFTER 99

MONROE 370811
STATUS:

CR 163/WESTBROOKS RD OVER TOWALIGA RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225 MANAGER: J. LEONI MONROE SGN DO ROW, UTIL & DETOURS 5-5-92.

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1993 UNDERWAY

ROW LOCL

CONST 1997 $ 410

FED SHARE $ 328

GA. SHARE $

82

OTH SHARE $

""

~::.:_.'

~ ."J

... ~:_ _~.~~-

:!:d ,_~.,---

1.,~::(

~~~~-:. J

<:::'::;....:__' -~-~'

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 180

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

MIDDLE GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PEACH I-75 @ SR 96

W. ROBINS TIP # WR1-1993(1)

PE 1993 UNDERWAY

311540 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 2

ROW 1997

$ 1227

LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: 2 /PROPOSED LANES: 4

CONST 1998

$ 3884

MANAGER: M. REYNOLDS

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 3496

STATUS: PEACH COUNTY REFUSED TO COMMIT FUNDS BY LETTER 11-28-95

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 388

OTH SHARE $

PEACH 311780
STATUS:

I-75: CR 182/WHITE ROAD OVER I-75 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .50/.80450 MANAGER: B. FERGUSON REQ PEACH DO UTIL 10-7-93; BYRON SGN 10-12-93 PUBLIC UTIL

CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1999 CONST

UNDERWAY

$

1

AFTER 99

PEACH 322450
STATUS:

SR 96 FM I-75 TO CR 540/0LD HAWKINSVILLE RD/HOUSTON COUNTY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES, LENGTH(Miles/km): 10.45/16.81405 MANAGER: M. REYNOLDS

PEACH 331940
STATUS:

SR 42 FM NEAR OLD FT VALLEY RD EAST TO SR 49 SW OF CHURCH ST CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): .40/.64360 MANAGER: GORDON BROWN COUNTY SGN 1-14-92 PUB UTIL; BYRON DO WATER LINES ONLY 8/93

W. ROBINS TIP # 1993(6) CONG DIST. 8 & 2
FUND SOURCE: SURFACE TRANSPORT . . FEDERAL HIGHWAY ADMIN FUNDS
32245X IS AN ASSOCIATED PROJECT,
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1998 ROW
CONST

$ 240 AFTER 99 AFTER 99

PE 1993 UNDERWAY

ROW 1997 $ 300

CONST 1998

$ 1479

FED SHARE $ 1183

GA. SHARE $ 296

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 181

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

MIDDLE GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PUTNAM SR 24/US 441 AT WASHINGTON AVENUE IN EATONTON

PE 1994 UNDERWAY

222450 SIGNALS / SAFETY

CONG DIST. 11

ROW LOCL

LENGTH(Miles/km): .12/.19308- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: D. GRIFFITH

FUND SOURCE: NAT'L HIGHWAY

STATUS: EATONTON SGN UTIL 2-16-93; & ADDL MAST ARM COST

FEDERAL HIGHWAY ADMIN FUNDS

CONST 1998

$

FED SHARE $

GA. SHARE $

1010 1000

OTH SHARE $

10

PUTNAM 231270
STATUS:

SR 16 OVER THE OCONEE RIVER @ HANCOCK COUNTY LINE REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .31/.49879 MANAGER: D. GRIFFITH HANCOCK SGN DO UTILITIES 5-20-96;PUTNAM SGN DO UTIL 5-7-96.

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW CONST

$

400

AFTER 99

AFTER 99

PUTNAM 270760
STATUS:

CR 212/FH 24 SOUTH OF SR 24 @ TOWN CREEK BRIDGES / REPLACEMENT
LENGTH(Miles/km): .20/.32180 MANAGER: D. GRIFFITH CO SGN ROW, UTIL & DETOURS 2-20-96.

CONG DIST. 11
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS

PUTNAM 271130
STATUS:

MARTIN MILL RD/CR 29/FH 27 @ LITTLE RIVER BRIDGES / REPLACEMENT LENGTH(Miles/km): .20/.32180 MANAGER: D. GRIFFITH PUTNAM SGN ROW, UTILITIES & DETOURS 3-5-96.

CONG DIST. 11
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1997

$

5

ROW LOCL

CONST 1998 $ 300

FED SHARE $ 300

GA. SHARE $

OTH SHARE $

PE 1997

$

13

ROW LOCL

CONST 1998

$

850

FED SHARE $ 850

GA. SHARE $

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

MIDDLE GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

TWIGGS 24502X
STATUS:

SR 18 @ BIG SANDY CK FM MP 0.2 IN TWIGGS TO MP 11.60 WILKNSN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .02/.03218 MANAGER: UNKNOWN WILKINSON SGN FOR UTILITIES 12-6-94.

CONG DIST. 0 & 0
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 245020 IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 182

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

MIDDLE GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

WILKINSO US 441 @ BIG SANDY CREEK S OF IRWINTON 221762 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .00/.00000
MANAGER: M. REYNOLDS STATUS: WILKINSON REFUSED UTILITIES 6-12-92

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

WILKINSO SR 29/US 441 @ BLACK CREEK 221935 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .00/.00000 MANAGER: M. REYNOLDS
STATUS: WILKINSON REFUSED 6-12-92 LETTER

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

WILKINSO SR 57 OVER THE OCONEE RIVER AT WASHINGTON COUNTY LINE 222220 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 3 LANES.
LENGTH(Miles/km): .35/.56315 MANAGER: D. GRIFFITH STATUS: WASHINGTON HAS NO INV UTILITY; WILKINSON REF DO UTIL 5-21-96

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 183

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1998 $ 1531

FED SHARE $ 1225

GA. SHARE $

306

OTH SHARE $

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1998

$

161

FED SHARE $

129

GA. SHARE $

32

OTH SHARE $

PE 1998 ROW CONST

$

80

AFTER 99

AFTER 99

WILKINSO SR 18 WESTBOUND FROM MP 24.83/JONES TO MP 1.28/WILKINSON
242300 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 1.80/2.89620
MANAGER: GORDON BROWN STATUS: REQ WILKINSON & JONES DO UTILITIES 9/4/96.

CONG DIST. 11 & 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 24230X IS AN ASSOCIATED PROJECT.

WILKINSO SR 18 @ BIG SANDY CK FM MP 0.2 IN TWIGGS TO MP 11.60 WILKNSN 245020 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .64/1.02976 MANAGER: D. GRIFFITH STATUS: WILKINSON SGN FOR UTILITIES 12-6-94.

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 24502X IS AN ASSOCIATED PROJECT.

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1997 $

ROW 1997

$

CONST 1998 $

FED SHARE $

GA. SHARE $

OTH SHARE $

20 168 1054
843
211

PE 1996 UNDERWAY

ROW 1998 $

10

CONST 1999 $ 995

FED SHARE $ 796

GA. SHARE $ 199

OTH SHARE $

NORTH GEORGIA REGIONAL DEVELOPMENT CENTER
Fannin Gilmer Murray Pickens Whitfield

gero,
.
1khouser
I

10 0

10

SCALE IN MILES

NORTH GEORGIA

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 184

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTH GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FANNIN SR 771 FM SR 5 NEAR CR 18 S/MCCAYSVILLE TO TENN. STATE LINE 620490 CONSTRUCTION OF NEW ROUTE WITH 5 LANES PROPOSED.

CONG DIST. 9

PE 1998 ROW

$

167

AFTER 99

LENGTH(Miles/km): 2.05/3.29845

CONST

AFTER 99

MANAGER: J. GRAYBEAL

FUND SOURCE: NAT'L HIGHWAY

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

FANNIN 621910
STATUS:

SR 2 SLIDE AREA@ MP 16.4 EAST OF MORGANTON

WALLS / MAINTENANCE

CONG DIST. 9

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

FANNIN 621950
STATUS:

SR 2/515 AT CR 260/WINDY RIDGE DRIVE

TURN LANES / SAFETY

CONG DIST. 9

LENGTH(Miles/km): .23/.37007 -EXIST. LANES: 4 /PROPOSED LANES: 4

MANAGER: GREG PARKER

FUND SOURCE: NAT'L HIGHWAY

FANNIN SIGN ROW, UTIL 7-6-95

FEDERAL HIGHWAY ADMIN FUNDS

FANNIN 670930
STATUS:

RESTORE MINERAL BLUFF DEPOT

HISTORIC FACILITIES / ENHANCEMENT

CONG DIST. 9

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: JANET HARVEY

FUND SOURCE: TRANS. ENHANCE.

LGPA TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE NONE

$

0

ROW 1996 UNDERWAY

CONST 1997

$

700

FED SHARE $ 560

GA. SHARE $ 140

OTH SHARE $

PE 1997

$

5

ROW LOCL

CONST 1998

$

172

FED SHARE $

172

GA. SHARE $

OTH SHARE $

PE LOCL

ROW NONE $

0

CONST 1997

$

128

FED SHARE $

101

GA. SHARE $

OTH SHARE $

27

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 185

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTH GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

GILMER SR 282/ELLIJAY FM WEST OF SR 5 ALT EAST TO SR 2

PE 1992 UNDERWAY

631100 ADDITION OF A PASSING LANE.

CONG DIST. 9

ROW 1995 UNDERWAY

LENGTH{Miles/km): 1.17/1.88253

CONST 1997 $ 2898

MANAGER: J. GRAYBEAL

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 2318

STATUS: ELLIJAY SGN 8-24-92. DOT WILL PAY GILMER UTIL 1-19-94

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

580

OTH SHARE $

GILMER 631110
STATUS:

SR 52 EB FM MP 16.0-17.8; WB MP 18.8-20.17 ADDITION OF A PASSING LANE. LENGTH{Miles/km): 3.17/5.10053 MANAGER: GREG PARKER GILMER SGN DO UTILITIES 7-14-92

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1995 UNDERWAY

CONST 1998

$ 1296

FED SHARE $ 1037

GA. SHARE $ 259

OTH SHARE $

GILMER 631430
STATUS:

SR 2/SR 52@ MOUNTAINTOWN CREEK 6.7 MI NW OF ELLIJAY REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. LENGTH{Miles/km): .23/.37007 MANAGER: GREG PARKER REQ GILMER COUNTY DO UTILITIES 10-6-93

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1998

$

41

CONST 1999 $ 1186

FED SHARE $ 949

GA. SHARE $ 237

OTH SHARE $

GILMER 631580
STATUS:

SR 282 BRIDGE REPLACEMENT OVER TAILS CREEK WEST OF ELLIJAY REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. LENGTH{Miles/km): .56/.90104 MANAGER: GREG PARKER GILMER REF DO UTLITIES 5-1-96.

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW
CONST

$

11

AFTER 99

AFTER 99

GILMER 671074
STATUS:

LANDSCAPING/STREETSCAPING OF LANDSCAPING / ENHANCEMENT LENGTH{Miles/km): .00/.00000
MANAGER: TO BE DONE BY CONTRACT

TOWN SQUARE IN ELLIJAY - EXIST. LANES: 0 /PROPOSED LANES:

CONG DIST. 9 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW LOCL

CONST 1998

$

500

FED SHARE $ 400

GA. SHARE $

OTH SHARE $ 100

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 186

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTH GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

MURRAY SR 52 @ L&N RR

PE 1996 UNDERWAY

620399 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.

CONG DIST. 9

ROW 1996 UNDERWAY

LENGTH(Miles/km): .17/.27353

CONST 1998

$

762

MANAGER: GREG PARKER

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

610

STATUS: CHATSWORTH SGN DO UTILITIES 5-6-96.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

152

OTH SHARE $

MURRAY 621265
STATUS:

SR 282/US 76 EB FM MP 4.5-5.7; WB FM MP 5.6-6.75 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.25/3.62025
MANAGER: GREG PARKER REV REQ MURRAY DO UTILITIES 8-7-96;CHATSWORTH NO CONFLICT.

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1996 UNDERWAY

CONST 1998

$ 1738

FED SHARE $ 1390

GA. SHARE $ 348

OTH SHARE $

MURRAY 670780
STATUS:

CR 299 OVER EMERY/HOLLY CREEK BRIDGES / REPLACEMENT LENGTH(Miles/km): .16/.25744 MANAGER: GREG PARKER COUNTY SGN FOR UTILITIES 7-8-92,

NO ROW REQUIRED

CONG DIST. 9
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW NONE $

0

CONST 1997

$

463

FED SHARE $

463

GA. SHARE $

OTH SHARE $

MURRAY 671055
STATUS:

CR 132/MITCHELL BR RD OVER CONASAUGA RIVER/WHITFIELD COUNTY REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. LENGTH(Miles/km): .87/1.39983 MANAGER: GREG PARKER REQ WHITFIELD DO RUO 5/22/96; MURRAY SGN CT PE,ROW,UTL 7/95

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 67105X IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW LOCL

CONST 1999

$ 2593

FED SHARE $

800

GA. SHARE $

OTH SHARE $ 1793

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 187

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTH GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PICKENS SR 53 EB MP 7.25-8.4; WB MP 8.4-10.05

PE 1992 UNDERWAY

621640 ADDITION OF A PASSING LANE.

CONG DIST. 9

ROW 1998 $ 278

LENGTH(Miles/km): 2.70/4.34430

CONST 1999

$ 1240

MANAGER: GREG PARKER

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $

992

STATUS: PICKENS REFUSED FOR UTILITIES 9-4-96.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 248

OTH SHARE $

PICKENS 621830
STATUS:

SR 53 AT MARY ST & SPRING ST./BURNT MOUNTAIN RD IN JASPER INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .12/.19308- EXIST. LANES: 3 /PROPOSED LANES:
MANAGER: GREG PARKER PICKENS SGN DO ROW, UTILITIES & DETOURS 5-18-95.

CONG DIST. 9 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1997

$

159

FED SHARE $

143

GA. SHARE $

16

OTH SHARE $

PICKENS 632680
STATUS:

SR 5/515 AT SR 53 WEST OF JASPER TURN LANES / SAFETY LENGTH(Miles/km): .45/.72405- EXIST. LANES:
MANAGER: UNKNOWN PICKENS SIGNED FOR ROW AND UTIL 5-16-96.

4 /PROPOSED LANES: OTO

CONG DIST. 9 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1997 UNDERWAY

ROW LOCL

CONST 1998 $ 370

FED SHARE $ 333

GA. SHARE $

37

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

NORTH GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

WHITFIEL I~75 & SR 3 CONN FM CR 91 E TO DUG GAP RD E/I-75 610690 INTERCHANGE / RECST. OR REHAB.
LENGTH(Miles/km): .60/.96540- EXIST. LANES: 2 /PROPOSED
MANAGER: RAY METTS STATUS: WHITFIELD COUNTY SIGNED FOR UTILITIES 7-29-91.

LANES:

CONG DIST. 9 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

WHITFIEL I-75 @ SR 3/US 41/ROCKY FACE EXIT

610760 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 9

LENGTH(Miles/km): .53/.85277- EXIST. LANES: 4 /PROPOSED LANES: 6

MANAGER: J. GARLAND

FUND SOURCE: I-STATE MAINT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 188

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$ 4284

FED SHARE $ 3427

GA. SHARE $ 857

OTH SHARE $

PE 1995 ROW 1998 CONST

UNDERWAY $ 250 AFTER 99

WHITFIEL I-75 INTERCHANGE AT CARBONDALE ROAD/CR 665 610890 INTERCHANGE / RECST. OR REHAB.
LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: MANAGER: RAY METTS STATUS: WHITFIELD SGN FOR UTILITIES 12-21-95

CONG DIST. 9 6 /PROPOSED LANES: 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

WHITFIEL I-75 RAMP AT SR 201 610900 RAMP / RECST. OR REHAB.
LENGTH(Miles/km): .40/.64360- EXIST. LANES: 6 /PROPOSED LANES: MANAGER: RAY METTS STATUS: WHITFIELD REF DO UTIL 4-12-96;REQ DALTON DO UTIL 4-18-96.

CONG DIST. 9 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

WHITFIEL SR 3/US 41 FM S OF STONECREST DR N TO CR 306/TUNNEL HILL 620960 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 2.90/4.66610 MANAGER: J. GARLAND STATUS: REQ DALTON DO UTIL 7/92;CO REF 10/94;TUNNELL NO INV UTIL.

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

WHITFIEL SR 71 FM N OF CR 213/677 NORTHERLY TO CR 19/COHUTTA 620975 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 4.10/6.59690 MANAGER: J. GRAYBEAL STATUS: DOT TO PAY WHITFIELD & COHUTTA 6/25/96.

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

WHITFIEL SR 201 EB MP 13.b-.i.4.9; v'TB MP 14.6-15.5; WB 17-18;RTL@ SR 2 631250 ADDITION OF A PASSING LANE.
LENGTH(Miles/km): 3.40/5.47060 MANAGER: GREG PARKER STATUS: REQ WHITFIELD DO UTILITIES 7/16/96.

CONG DIST. 9
FU':1D <:0!1?rE: SURFACE TRANSPORT. FEDERAL HIGrtm>~ "---'C~'I~l FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1995 UNDERWAY

ROW 1997 $

10

CONST 1998

$

686

FED SHARE $

617

GA. SHARE $

69

OTH SHARE $

PE 1995 UNDERWAY

ROW 1997

$

10

CONST 1999

$

187

FED SHARE $

168

GA. SHARE $

19

OTH SHARE $

PE 1992

UNDERWAY

ROW 1993 UNDERWAY

CONST 1999 $ 7482

FED SHARE $ 5986

GA. SHARE $ 1496

OTH SHARE $

PE 1992

UNDERWAY

ROW 1993 UNDERWAY

CONST 1997

$ 4059

FED SHARE $ 3247

GA. SHARE $

812

OTH SHARE $

PE 1992

UNDERWAY

ROW 1998

$

284

CONST 1999

$ 3886

FED SHARE $ 3109

GA. SHARE $

777

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

NORTH GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

WHITFIEL CR 132/MITCHELL BR RD OVER CONASAUGA RIVER/MURRAY COUNTY 67105X REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .00/.00000 MANAGER: UNKNOWN STATUS:

('('IU'
F"UND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 671055 IS AN ASSOCIATED PROJECT.

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 189

FISCAL YEAP

COST

PE 1998 $

0

ROW LOCL

CONST 1999

$

0

FED SHARE $

GA. SHARE $

OTH SHARE $

('
NORTHEAST GEORGIA REGIONAL DEVELOPMENT CENTER
Barrow Clarke Elbert Greene Jackson Madison Morgan Newton Oconee Oglethorpe Walton

10 0

10

SCALE IN MILES

NORTHEAST GEORGIA
ROC change effective 7-1-96

<a:

'"'"' --~'?

'(~~~

~;'"~~_:'i':;':1

li.:.i'!!::'':::lt:Jl

'il:i:.:c:,:_;,iJJ

c.~'-'>;

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 190

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--E-N-T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BARROW SR 316 IN BARROW AND OCONEE COUNTIES-26 INTERCHANGES

PE 1997 $ 100

122870 INTERCHANGE / NEW CONSTRUCTION

.CONG DIST. 10

ROW

AFTER 99

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 4 /PROPOSED LANES: 4

CONST

AFTER 99

MANAGER: M. REYNOLDS

FUND SOURCE: NAT'L HIGHWAY

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

BARROW 132220
STATUS:

SR 211 @ CR 326/MP 17.51;CR 61/MP 21.05;CHATEAU ELAN/MP 22.0 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. LENGTH(Miles/km): 1.26/2.02734
MANAGER: L. OWENS BARROW SGN 11/93 UTIL; REFUSED BY WINDER 1/94/BRASELTN 10/95

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

BARROW 132570
STATUS:

SR 53/GAINESVILLE HWY. @ CEDAR CREEK 2.7 MI NORTH OF WINDER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .30/.48270 MANAGER: L. OWENS REQ WINDER DO PUB UTIL 11/94; COUNTY SGN FOR UTIL 11-16-94

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 132670 IS AN ASSOCIATED PROJECT.

BARROW 132670
STATUS:

SR 53 AT ROCKWELL CHURCH RD/CR 4 NORTH OF WINDER
INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .20/.32180- EXIST. LANES: 2 /PROPOSED LANES:
MANAGER: L. OWENS BARROW SGN DO UTILITIES 3-19-96.

CONG DIST. 10 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 132570 IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1992 UNDERWAY ROW 1996 UNDERWAY
CONST 1998 $ 1530 FED SHARE $ 1224 GA. SHARE $ 306 OTH SHARE $

PE 1996 UNDERWAY

ROW 1998 $

75

CONST 1999 $ 602

FED SHARE $

482

GA. SHARE $ 120

OTH SHARE $

PE 1997 UNDERWAY

ROW 1998 $

31

CONST 1999

$

669

FED SHARE $

602

GA. SHARE $

67

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997IFY 1999

NORTHEAST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

CLARKE 1D1019
STATUS:

PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

20-Sep-1996 Page 191

FISCAL YEAR

COST ESTS

OPERATING 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1995 510
1485

CLARKE 1D1020
STATUS:

TRANSIT VEHICLES, CAPITAL MAINTENANCE TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$ 302

FED SHARE $ 242

GA. SHARE $

30

OTH SHARE $

30

CLARKE 1D1022
STATUS:

TRANSIT VEHICLE TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1997

$ 255

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $ 204

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

26

OTH SHARE $

26

CLARKE 101023
STATUS:

MULTIMODAL TRANSPORTATION CENTER TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1998

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

2600 2080
260 260

CLARKE 101061
STATUS:

TRANSIT VEHICLES, OFFICE EQUIP., FACILITY IMPROVEMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$ 326

FED SHARE $ 261

GA. SHARE $

33

OTH SHARE $

33

CLARKE 1D1062
STATUS:

TRANSIT VEHICLE, VAN, CAPITAL MAINT., ADMIN VEH., SHELTERS
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1998

$ 805

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

644

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

81

OTH SHARE $

81

CLARKE 101063
STATUS:

PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

OPERATING 1998 $ FED SHARE $
GA. SHARE $ OTH SHARE $

2061 391
1670

fe_ -~ I

~'C:-2:'?

~-:-E"r,.,

l'i ...... ~-.~~

1:_~:.:-<::

v 'li'. ..::....~.:....

!:::~-.- ' . )

~.::...:::.....:. ~ ~)

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997IFY 1999

NORTHEAST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

CLARKE 101065
STATUS:

PUBLIC TRANSIT SERVICE IN ATHENS AND CLARKE COUNTY TRANSIT PROJECTS I OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CLARKE 1D1066
STATUS:

TRANSIT VEHICLES, VAN, CAP. MAINT., SHELTERS, OFFICE EQUIP. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

20-Sep-1996 Page 192

FISCAL YEAR

COST ESTS

OPERATING 1999 $ FED SHARE $
GA. SHARE $ OTH SHARE $

2130 392
1738

CAPITAL 1999

$ 479

FED SHARE $ 383

GA. SHARE $

48

OTH SHARE $

48

CLARKE 1D1067
STATUS:

TRANSIT VEHICLE
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH

CLARKE 1V7007
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1999

$ 283

FUND SOURCE: URBAN TRANSIT DISC. FEDERAL TRANSIT ADMIN FUNDS

FED SHARE $ 226

GA. SHARE $

28

OTH SHARE $

28

CONG DIST. 10

CAPITAL 1997

$

30

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

CLARKE 1V7018
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1998

$

31

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

CLARKE 1V7023
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1999

$

33

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

OTH SHARE $

3

CLARKE 7D754Z
STATUS:

ATLANTA-ATHENS COMMUTER RAIL LINE-FOR PRELIMINARY - 7D7544
RAIL PROJECTS I PLANNING
FUNDS RECIPIENT: MANAGER: STEVE KISH PRELIMINARY ENGINEERING STUDIES

CONG DIST. 0 & 0

PLANNING NONE

$

0

FUND SOURCE: NON FEDERAL TRANSIT

7D7544 IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

20-Sep-1996 Page 193

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLARKE SR 15 ALT/US 129 FM LAVENDER DR/CLARKE TO SR 330/JACKSON

ATHENS TIP # II-10

PE 1992 UNDERWAY

122160 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 10

ROW 1998 $ 3054

LENGTH(Miles/km): 3.67/5.90503

CONST

AFTER 99

MANAGER: J. GARLAND

FUND SOURCE: SURFACE TRANSPORT.

STATUS: REQ ATHENS/CLARKE AND JACKSON COUNTY DO UTILITIES 11-9-92

FEDERAL HIGHWAY ADMIN FUNDS

12216X IS AN ASSOCIATED PROJECT.

CLARKE 122600
STATUS:

SR 10 RELOC BARNETT SHOALS RD TO ALIGN WITH WINTERVILLE RD TURN LANES / SAFETY
LENGTH(Miles/km): .34/.54706- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: L. OWENS REVISION REQ ATHENS-CLARKE DO UTILITIES 7-11-96.

ATHENS TIP # III-02 CONG DIST. 10 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 UNDERWAY

ROW 1997 $ 483

CONST 1998

$

498

FED SHARE $ 448

GA. SHARE $

50

OTH SHARE $

CLARKE 150213
STATUS:

CR 473/EPPS BRIDGE RD & SR 10@ MIDDLE OCONEE RVR,INT.&WALLS BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000 MANAGER: B. FERGUSON SEE #150210

ATHENS TIP # IV-03 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1997 $
FED SHARE $ GA. SHARE $ OTH SHARE $

0
0 3785 3028
757

CLARKE 15021X

EPPS BRIDGE RD OVER MCNUTT CREEK/SEE OCONEE-150215

ATHENS TIP # II-03

UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: BRIDGE YROGRAM

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

150215 IS AN ASSOCIATED PROJECT.

CLARKE CR 473/EPPS BR RD FM SR 10/0CONEE TO US 78 ... SEE OCONEE

ATHENS TIP# II-03

PE NONE

$

0

15021Y UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE $

0

MANAGER: UNKNOWN

FUND SOURCE: SURFACE TRANSPORT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

150210 IS AN ASSOCIATED PROJECT.

CLARKE 170925
STATUS:

BIKEWAY/LANDSCAPING ON EPPS BRIDGE ROAD IN ATHENS

ATHENS TIP # V-01

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 10

LENGTH(Miles/km): 3.00/4.82700 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: B. FERGUSON

FUND SOURCE: TRANS. ENHANCE.

LGPA INCLUDED IN 150210

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW LOCL

CONST 1997

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1048 838 75 135

"-~'~-"':P

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 194

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ELBERT CR 242/BREWERS BRIDGE RD @ BEAVERDAM CK 2.5 MI N OF ELBERTON

PE 1995 UNDERWAY

142020 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 10

ROW LOCL

LENGTH(Miles/km): .19/.30571

CONST 1999 $ 571

MANAGER: L. OWENS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

457

STATUS: ELBERT COUNTY SGN FOR ROW, UTILITIES & DETOURS 10-30-94

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 114

OTH SHARE $

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P. I. NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

NORTHEAST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

GREENE 221360
STATUS:

SR 12/GREENSBORO FM WALNUT ST TO E OF EAST GREENE ST RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. LENGTH(Mi1es/km): .39/.62751
MANAGER: D. GRIFFITH GREENE SGN DO ROW & UTIL 6-6-88;REQ CITY DO UTIL 8-7-96.

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

GREENE 221610
STATUS:

SR 12/GREENSBORO FM E OF EAST GREENE ST TO EB PASSING LANE

TURN LANES / RECST. OR REHAB.

CONG DIST. 11

LENGTH(Miles/km): 1.10/1.76990- EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: D. GRIFFITH

FUND SOURCE: SURFACE TRANSPORT.

GREENE SGN UTIL 6-28-96; CONFIRM REQ CITY FOR P UTIL 8-7-96

FEDERAL HIGHWAY ADMIN FUNDS

GREENE 222080
STATUS:

SR 15 N/GREENSBORO MP 15.4 - 17.3; MP 21.0 - 22.6 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 3.50/5.63150 MANAGER: D. GRIFFITH

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 195

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1994 UNDERWAY

CONST 1997

$

478

FED SHARE $ 382

GA. SHARE $

96

OTH SHARE $

PE 1992 UNDERWAY
ROW 1994 UNDERWAY CONST 1997 $ 1597
FED SHARE $ 1278 GA. SHARE $ 319 OTH SHARE $

PE 1997
ROW 1999 CONST

$

43

$

10

AFTER 99

GREENE 245100
STATUS:

SR 15 OVER HARRIS BRANCH 9.7 MILES NW OF GREENSBORO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: D. GRIFFITH
GREENE SGN DO UTILITIES 7/12/96.

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW CONST

$

8

AFTER 99

AFTER 99

GREENE 245110
STATUS:

SR 15 OVER FISHING CREEK 7.9 MILES NW OF GREENSBORO REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .30/.48270 MANAGER: D. GRIFFITH GREENE SGN DO UTILITIES 7/12/96.

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW CONST

$

10

AFTER 99

AFTER 99

GREENE 245120
STATUS:

SR 15 OVER TOWN CREEK 5.2 MILES N OF GREENSBORO REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: D. GRIFFITH GREENE SGN DO UTILITIES 7/12/96.

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW CONST

$

12

AFTER 99

AFTER 99

GREENE 270680
STATUS:

CR 38 @ RICHLAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .10/.16090 MANAGER: D. GRIFFITH GREENE COUNTY SIGNED 6-1-90 FOR ROW, UTILITIES & DETOURS

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1991 UNDERWAY

ROW LOCL

CONST 1997

$

189

FED SHARE $ 151

GA. SHARE $

38

OTH SHARE $

ta/~-:''3~

1$ ~'~'".~J

I;,_~_,:_<.)

w.:::-:-.!.::..-M

~'"c"--'---

\,t,-~' 'C.--)

(_ ~ - .

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 196

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-EA-R-_--------E-S-T-S--

GREENE CR 66/LESLIE MILL RD @ BEAVERDAM CRK

PE 1992

UNDERWAY

270681 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

. CONG DIST. 11

ROW LOCL

LENGTH(Miles/km): .25/.40225

CONST 1997

$

191

MANAGER: D. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

153

STATUS: GREENE COUNTY SIGNED 6-1-90 FOR ROW, UTILITIES & DETOURS

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

38

OTH SHARE $

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 197

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

JACKSON SR 11/US 129 FM E/MIDDLE OCONEE RVR TO CR 236/INCL I-85 BR 110250 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 10

PE 1992 ROW 1995

UNDERWAY UNDERWAY

LENGTH(Miles/km): .45/.72405

CONST 1997

$ 4424

MANAGER: M. GANNAWAY STATUS: DOT TO PAY JACKSON UTL 2/22/94;DOT TO PAY JEFFERSON 4/12/96.

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 3539 GA. SHARE $ 885

121604 IS AN ASSOCIATED PROJECT.

OTH SHARE $

JACKSON 110445
STATUS:

I-85 SIGN MOD FM SR 211 TO SC STATE LN; AND BANKS/FRANKLIN SIGNING / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: KARL ALFF NOT APPLICABLE

CONG DIST. 10 & 6 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 11044Z IS AN ASSOCIATED PROJECT.

PE NONE $ ROW NONE $
CONST 1997 $ FED SHARE $ GA. SHARE $ OTH SHARE $

0 0 1100 1100

JACKSON 121600
STATUS:

SR 11 FM SCL PENDERGRASS TO SR 332 / PART NEW LOCATION RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.30/5.30970 MANAGER: M. GANNAWAY SGN PENDERGRASS 10/91,JEFFERSON 4/91 & JACKSON 4/92 UTIL.

JACKSON 121604
STATUS:

SR 11 FM PROP. JEFFERSON BYP W TO S CITY LIMITS PENDERGRASS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.42/3.89378 MANAGER: M. GANNAWAY JACKSON SGN 6/92 UTIL;DOT TO PAY JEFFERSON 4/12/96.

JACKSON 122150
STATUS:

SR 11 FM SR 332/TALMO TO SR 323/HALL COUNTY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 7.40/11.90660 MANAGER: B. FERGUSON REQ HALL DO UTILITIES 6-6-96;JACKSON SGN DO PUB UTIL 6/18/96

CONG DIST. 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 110250 IS AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 12215X IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY
ROW 1998 $ 200 CONST 1999 $ 6000
FED SHARE $ 4800 GA. SHARE $ 1200 OTH SHARE $

PE 1992 UNDERWAY

ROW 1995 UNDERWAY

CONST 1997 $ 4586

FED SHARE $ 3669

GA. SHARE $

917

OTH SHARE $

PE 1992 ROW 1998
CONST

UNDERWAY $ 1985 AFTER 99

JACKSON SR 15 ALT/US 129 FM LAVENDER DR/CLARKE TO SR 330/JACKSON

PE NONE

$

0

12216X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: J. GARLAND

FUND SOURCE: SURFACE TRANSPORT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

122160 IS AN ASSOCIATED PROJECT.

JACKSON 122400
STATUS:

SR 53 NEAR HOSCHTON NB FM MP 6.8-8.4 [N&S OF CR 421] ADDITION OF A PASSING LANE. LENGTH(Miles/km): 1.60/2.57440 MANAGER: L. OWENS JACKSON COUNTY SIGNED FOR PUBLIC UTILITIES ONLY 1-15-96

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW 1998 $

89

CONST 1999 $ 446

FED SHARE $ 357

GA. SHARE $

89

OTH SHARE $

~---

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 198

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

JACKSON SR 15 ALT IN JEFFERSON AT BIG CURRY CREEK

PE 1993 UNDERWAY

122510 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 3 LANES.

CONG DIST. 10

ROW 1998

$

20

LENGTH(Miles/km): .15/.24135

CONST 1999

$

822

MANAGER: L. OWENS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 658

STATUS: CITY OF JEFFERSON REFUSED TO COMMIT FUNDING 11-13-95

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 164

OTH SHARE $

JACKSON 132040
STATUS;

JEFFERSON BYP FM SR15 ALT SE CL/ARCADE NW TO SR11 NEAR CR229 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 6.90/11.10210 MANAGER: L. OWENS SGN JEFFERSON 2/90 UTL,ARCADE PUB UTL 2/92/JACKSON REFUSED

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1997 CONST

UNDERWAY
$ 3168 AFTER 99

JACKSON 132550
STATUS:

SR 11 AT SR 124/GALILEE CHURCH ROAD

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 10

LENGTH(Miles/km): .45/.72405- EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: L. OWENS

FUND SOURCE: HWY. SAFETY

DOT TO PAY JACKSON PRIVATE UTILITIES 3/4/96.

FEDERAL HIGHWAY ADMIN FUNDS

JACKSON 171000
STATUS:

CR 184 @ WALNUT CREEK 4 MI NORTH OF BRASELTON REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. LENGTH(Miles/km): .20/.32180 MANAGER: L. OWENS JACKSON SGN 10-18-93 ROW, UTILTIES & DETOURS

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

JACKSON 171001
STATUS:

CR 269 @ CANDLER CREEK 8.5 MI NE OF TALMO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180
MANAGER: L. OWENS JACKSON SGN 10-18-93 ROW, UTILITIES & DETOURS

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

JACKSON 171002
STATUS:

CR 367/WHITES BOTTOM ROAD @ WALNUT CREEK NE OF BRASELTON REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. LENGTH(Miles/km): .20/.32180
MANAGER: L. OWENS JACKSON SGN 10-18-93 ROW, UTILITIES & DETOURS

CONG DIST. 10
FUND SOURCE: BP.IDG"' PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

JACKSON 171070
STATUS:

HISTORIC JACKSON CO COURTHOUSE LANDSCAPING IN JEFFERSON LANDSCAPING / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT

CONG DIST. 10 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW LOCL

CONST 1997 $ 939

FED SHARE $ 845

GA. SHARE $

94

OTH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1997

$

299

FED SHARE $ 239

GA. SHARE $

60

OTH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1997

$

399

FED SHARE $ 319

GA. SHARE $

80

OTH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1997

$

353

FED SHARE $ 282

GA. SHARE $

71

OTH SHARE $

PE LOCL

ROW LOCL

CONST 1997

$

179

FED SHARE $ 143

GA. SHARE $

OTH SHARE $

36

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 199

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

MORGAN I-20 REST AREA 52 & 53 UPGRADE REST AREA

PE 1994

UNDERWAY

210560 REST AREA / RECST. OR REHAB.

CONG DIST. 10

ROW 1996 UNDERWAY

LENGTH(Miles/km): .30/.48270- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1998

$ 7617

MANAGER: J. GARLAND

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 6094

STATUS: DOT TO PAY 1-21-94

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1523

OTH SHARE $

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

NORTHEAST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

NEWTON 210530
STATUS:

I-20 @ SR 142-12/COVINGTON (INCL RELOC OF FRONTAGE RD/CR 72)

INTERCHANGE / RECST. OR REHAB.

CONG DIST. 10

LENGTH(Miles/km): .71/1.14239 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: D. CHURCH

FUND SOURCE: I-STATE MAINT.

REQ COVINGTON DO UTILITIES 10/92; NEWTON SGN 10-27-92 UTIL

FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 200

FISCAL YEAR

COST ESTS

PE 1993 ROW 1999 CONST

UNDERWAY $ 3754 AFTER 99

NEWTON 210640
STATUS:

I-20 AT GA. RR, ALCOVY RD, ALCOVY RVR & OVERFLOW BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .93/1.49637 MANAGER: G. ROSS REQ COVINGTON DO UTIL 10-5-93; NEWTON SGN 10-13-93 UTILITIES

CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

NEWTON 222040
STATUS:

SR 36/COVINGTON FM OLD MONTICELLO RD TO CR 348/PETTY ST

TURN LANES / RECST. OR REHAB.

CONG DIST. 10

LENGTH(Miles/km): 1.10/1.76990- EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: D. GRIFFITH

FUND SOURCE: SURFACE TRANSPORT.

NEWTON SGN PUBLIC UTIL 10-7-93; COVINGTON REFUSED 10-1-92

FEDERAL HIGHWAY ADMIN FUNDS

NEWTON 231220
STATUS:

SR 142 FM S OF SR 12/US 278 NORTH TO N OF CR 75 IN COVINGTON RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.07/1.72163 MANAGER: D. CHURCH

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1997

$ 2303

FED SHARE $ 2073

GA. SHARE $

230

OTH SHARE $

PE 1993 UNDERWAY

ROW 1995 UNDERWAY

CONST 1999

$ 1001

FED SHARE $

801

GA. SHARE $

200

OTH SHARE $

PE 1998 ROW 1999 CONST

$

67

$ 266

AFTER 99

NEWTON 271010
STATUS:

CR 263/CONLEY DITCH ROAD @ LAKE JACKSON 10 MI S OF COVINGTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: D. GRIFFITH NEWTON SGN FOR ROW, UTILITIES & DETOURS 10-11-94

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996

UNDERWAY

ROW LOCL

CONST 1998

$

444

FED SHARE $ 355

GA. SHARE $

89

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

NORTHEAST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

OCONEE 141970
STATUS:

SIMONTON BRIDGE RD FM US 441 IN WATKINSVILLE TO CLARKE CL

ATHENS TIP # II-05

MINOR WIDEN & RESURF / RECST. OR REHAB.

CONG DIST. 10

LENGTH(Miles/km): 2.50/4.02250 -EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: L. OWENS

FUND SOURCE: SURFACE TRANSPORT.

OCONEE SGN DO ROW, UTIL 4-30-96;REQ CITY DO R, U 12-29-95.

FEDERAL HIGHWAY ADMIN FUNDS

OCONEE 141980
STATUS:

MARS HILL RD/CR 263 FM US 78 TO SR 53

ATHENS TIP # II-04

MINOR WIDEN & RESURF / RECST. OR REHAB.

CONG DIST. 10

LENGTH(Miles/km): 5.59/8.99431 - EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: L. OWENS

FUND SOURCE: SURFACE TRANSPORT.

OCONEE SGN DO ROW & UTILITIES 6-4-96.

FEDERAL HIGHWAY ADMIN FUNDS

OCONEE 142030
STATUS:

MARS HILL RD/CR 263 FM DIALS MILL RD TO us 78

MINOR WIDEN & RESURF / RECST. OR REHAB.

CONG DIST. 10

LENGTH(Miles/km): 2.70/4.34430- EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: L. OWENS

FUND SOURCE: SURFACE TRANSPORT.

OCONEE SGN DO ROW,UTIL & DET 4-2-96;REQ BOGART R,U,D 3-6-96

FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 201

FISCAL YEAR

COST ESTS

PE 1996 UNDERWAY

ROW LOCL

CONST 1999

$

600

FED SHARE $ 480

GA. SHARE $ 120

OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1999 $ 180

FED SHARE $ 144

GA. SHARE $

36

OTH SHARE $

PE 1997 ROW LOCL CONST

$

7

AFTER 99

OCONEE 150210
STATUS:

CR 473/EPPS BRIDGE RD FM SR 10 TO SR lOBUS/US 78/CLARKE CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.10/4.98790 MANAGER: B. FERGUSON CLARKE SGN 2/95 PE/ROW/UTIL/CST-$1,426,500;0CONEE SGN 11/94

OCONEE 150215
STATUS:

EPPS BRIDGE RD OVER MCNUTT CREEK/SEE CLARKE CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .50/.80450 MANAGER: B. FERGUSON CLARKE SGN PE,ROW,UTL& PART CST 2/95;0CONEE SGN 11/94;150210

OCONEE 245130
STATUS:

SR 15 OVER ROSE CREEK 7.5 MILES SE OF FARMINGTON REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007 MANAGER: D. GRIFFITH OCONEE SGN DO UTIL 8/6/96, LIABILITY NOT EXCEED $5,000.

ATHENS TIP # II-01 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 15021Y IS AN ASSOCIATED PROJECT.
ATHENS TIP # IV-02 CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 15021X IS AN ASSOCIATED PROJECT.
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1996 UNDERWAY
CONST 1997 $ 9103 FED SHARE $ 7282 GA. SHARE $ 1821 OTH SHARE $

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1997

$

797

FED SHARE $

638

GA. SHARE $

159

OTH SHARE $

PE 1998 ROW CONST

$

11

AFTER 99

AFTER 99

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

L~" ~~","

C..

~--

,;:_I

E:::::..:.:- _)

t::oC

"-'~'

')

l.,",

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 202

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-OM--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

OGLETHOR SR 22 @ BROOKS CREEK 2.5 MI S OF LEXINGTON

PE 1997 UNDERWAY

242315 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Mi1es/km): .21/.33789

CONG DIST. 10

ROW 1999 CONST

$

11

AFTER 99

MANAGER: D. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

STATUS: OGLETHORPE SIGNED FOR UTILITIES 5-16-95

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 203

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

NORTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

WALTON SR 81 AT MONROE YOUTH/CENTERHILL CHURCH ROAD

PE NONE

$

0

122560 TURN LANES / SAFETY

CONG DIST. 10

ROW LOCL

LENGTH(Miles/km): .59/.94931- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1997

$

490

MANAGER: L. OWENS

FUND SOURCE: HWY. SAFETY

FED SHARE $ 441

STATUS: WALTON SGN 12-11-95 FOR ROW & UTILITIES WITH STIPULATION

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

49

OTH SHARE $

WALTON 132620
STATUS:

SR 20 AT SR 81 IN LOGANVILLE

TURN LANES / SAFETY

CONG DIST. 10

LENGTH(Miles/km): .22/.35398- EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: L. OWENS

FUND SOURCE: HWY. SAFETY

LOGANVILLE SGN FOR ROW & UTILITIES 5-2-95

OTO

FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1998

$

91

FED SHARE $

82

GA. SHARE $

9

OTH SHARE $

WALTON 171170
STATUS:

CR 289/BEARDEN ROAD @ JACKS CREEK 1.2 MI NW OF GOOD HOPE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .37/.59533 MANAGER: L. OWENS WALTON SGN DO ROW, UTILITIES & DETOURS 9-28-94

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 UNDERWAY

ROW LOCL

CONST 1998

$

427

FED SHARE $

342

GA. SHARE $

85

OTH SHARE $

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

f
i
t"
SOUTH GEORGIA REGIONAL DEVELOPMENT CENTER
Ben Hill Berrien Brooks
Cook Echols Irwin Lanier Lowndes
Tift Turner

ston
!CKDTS1

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 204

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTH GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BEN HILL CR 245 ~ WILLACHOOCHEE CREEK ~p 1 MI EAST OF JCT SR 107

PE 1997

$

ll

431180 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 8

ROW LOCL

LENGTH(Miles/km): .22/.35398

CONST

AFTER 99

MANAGER: J. SHEFFIELD

FUND SOURCE: BRIDGE PROGRAM

STATUS: BEN HILL SGN DO ROW, UTIL & DET 4-22-96.

FEDERAL HIGHWAY ADMIN FUNDS

BEN HILL SR 107/US 319 OVER STURGEON CREEK NEAR CR 5 442580 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .75/1.20675 MANAGER: J. SHEFFIELD STATUS: BEN HILL SGN FOR UTILITIES 11-15-95

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

BEN HILL EVERGREEN CEMETERY ROAD OVER TURKEY CREEK IN FITZGERALD 450420 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .09/.14481 MANAGER: J. SHEFFIELD STATUS: DOT TO PAY 2-29-96.

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1994 UNDERWAY

ROW 1997 UNDERWAY

CONST 1998

$

689

FED SHARE $ 551

GA. SHARE $ 138

OTH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1997 $ 206

fED SHARE $ 165

GA. SHARE $

41

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

SOUTH GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

BROOKS 421720
STATUS:

SR 133 FM W/CR 276 TO E. OF WITHLACOOCHEE RVR/LOWNDES RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.80/2.89620 MANAGER: K. FULBRIGHT BROOKS SGN FOR UTIL 9-5-95; LOWNDES SGN FOR UTIL 12-5-90

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 42172X IS AN ASSOCIATED PROJECT.

BROOKS 421722
STATUS:

SR 133 @ LITTLE; WITHLACOOCHEE RVR & OFLW & LOWNDES REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: K. FULBRIGHT BROOKS SGN DO UTIL 2-13-96; LOWNDES SGN 12/5/90 UTIL.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 42172Y IS AN ASSOCIATED PROJECT.

BROOKS 422510
STATUS:

SR 38/US 84-221 BRIDGE CULVERT APPROX. 2 MI. E. OF QUITMAN BRIDGES / NEW CONSTRUCTION LENGTH(Miles/km): .50/.80450 MANAGER: J. SHEFFIELD BROOKS SGN DO UTILITIES 2-13-96.

CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

BROOKS 442680
STATUS:

CR 275 @ CAT CREEK APPROXIMATELY 4 MILES SOUTH OF DIXIE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: J. SHEFFIELD CO SGN DO ROW, UTILITIES & DETOURS 1-9-96.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 442682 IS AN ASSOCIATED PROJECT.

BROOKS 442682
STATUS:

CR 275 @ PISCOLA CREEK APPROXIMATELY 2.5 MILES SE OF DIXIE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: J. SHEFFIELD CO SGN DO ROW, UTILITIES & DETOURS 1-9-96.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 442680 IS AN ASSOCIATED PROJECT.

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 205

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$ 3000

FED SHARE $ 2400

GA. SHARE $

600

OTH SHARE $

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1997

$ 6550

FED SHARE $ 5240

GA. SHARE $ 1310

OTH SHARE $

PE 1997 $

10

ROW NONE $

0

CONST 1997 $ 529

FED SHARE $ 423

GA. SHARE $ 106

OTH SHARE $

PE 1995 UNDERWAY

ROW LOCL

CONST 1999 $ 127

FED SHARE $ 102

GA. SHARE $

25

OTH SHARE $

PE 1995 UNDERWAY

ROW LOCL

CONST 1999

$

781

FED SHARE $ 625

GA. SHARE $ 156

OTH SHARE $

L

E-:~- ::;

....... ~--:::...-;:'4

!/;!"- -22'-:J

(,_-"<::.._.::.,,_

Iii:~-

~~ -~- - J

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 206

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTH GEORGIA

FISCAL

COST

-P--. I-.-N--O-. ---------------P-R--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COOK

I-75 @ SR 37/ADEL [FM 1500 FT WEST TO 650 FT EAST I-75]

PE 1992 UNDERWAY

410420 INTERCHANGE / RECST. OR REHAB.

CONG DIST. 8

ROW 1997 $ 100

LENGTH(Miles/km): .60/.96540- EXIST. LANES: 2 /PROPOSED LANES: 5

CONST 1998 $ 3071

MANAGER: J. GARLAND

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 2764

STATUS: ADEL REF UTILITIES 6-29-92;COUNTY TABLED LGPA 11-13-91.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 307

OTH SHARE $

COOK 410530
STATUS:

I-75 FM CR 246/COOK TO CR 204 IN TIFT COUNTY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): 10.23/16.46007 MANAGER: B. FERGUSON REQ COOK, LENOX & TIFT DO UTILITIES 10-30-91

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 41053X IS AN ASSOCIATED PROJECT.

PE 1993
ROW 1998 CONST

UNDERWAY
$ 4800 AFTER 99

COOK 410600
STATUS:

I-75 REST AREAS #5 & 6 UPGRADE REST AREA

REST AREA / RECST. OR REHAB.

CONG DIST. 8

LENGTH(Miles/km): 1.89/3.04101 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: J. GARLAND

FUND SOURCE: UNKNOWN

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

COOK 410620
STATUS:

I-75 R/W FOR HEART PINE & CECIL BAY WETLANDS WATER POLLUTION MITIG. / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: MANAGER: J. SHEFFIELD NOT APPLICABLE

- MITIGATION 0 /PROPOSED LANES:

CONG DIST. 8 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY
ROW 1996 UNDERWAY
CONST 1998 $ 7079
FED SHARE $ 5663 GA. SHARE $ 1416 OTH SHARE $

PE NONE $

0

ROW 1997

$

300

CONST NONE $

0

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 207

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTH GEORGIA

FISCAL

COST

-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-EV--EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ECHOLS CR 120 @ ALAPAHA RIVER APP 2 MI EAST OF HOWELL

PE 1997

$

10

442760 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.

CONG DIST. 8

ROW LOCL

LENGTH(Miles/km): .26/.41834 MANAGER: J. SHEFFIELD STATUS: REQ ECHOLS DO ROW, UTIL & DET 7/3/96.

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CONST 1998

$

80

FED SHARE $

64

GA. SHARE $

16

OTH SHARE $

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

"

'J

_. _-)

''-.)

1<<-,:~

J

~-

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 208

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTH GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

LOWNDES SR 133 FM W/CR 276 TO E. OF WITHLACOOCHEE/ SEE BROOKS-421720

PE NONE

$

0

42172X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: K. FULBRIGHT

FUND SOURCE: SURFACE TRANSPORT.

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

421720 IS AN ASSOCIATED PROJECT.

LOWNDES 42172Y

SR 133 @ LITTLE; WITHLACOOCHEE RVR & OFLW; SEE BROOKS-421722

UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: K. FULBRIGHT

FUND SOURCE: BRIDGE PROGRAM

PE NONE

$

0

ROW NONE

$

0

CONST NONE

$

0

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

421722 IS AN ASSOCIATED PROJECT.

LOWNDES 422290
STATUS:

SR 125 FM CR 867 TON. OF HIGHTOWER RD/MOODY AFB N GATE RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. LENGTH(Miles/km): 8.73/14.04657
MANAGER: J. GRAYBEAL LOWNDES SGN 12-6-95 UTIL;VALDOSTA REFUSED PUBLIC UTL 9-9-94

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1996 UNDERWAY

CONST 1998

$ 9267

FED SHARE $ 7414

GA. SHARE $ 1853

OTH SHARE $

LOWNDES 431680
STATUS:

SR 7/US 41 AT CR 570 AND CR 868/HAHIRA RD

INTERSECTION IMPROVEMENT / SAFETY

CONG DIST. 2

LENGTH(Miles/km): .66/1.06194 - EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: J. SHEFFIELD

FUND SOURCE: HWY. SAFETY

FEDERAL HIGHWAY ADMIN FUNDS

PE 1999 ROW LOCL CONST

$

10

AFTER 99

LOWNDES 442565
STATUS:

OLD CLYATTVILLE RD/CR 785 OVER MUD CREEK IN VALDOSTA REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .20/.32190 MANAGER: J. SHEFFIELD CO SGN 12-6-95 & VALDOSTA SGN 4-21-95 FOR ROW, UTIL & DETOUR

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

LOWNDES 442780
STATUS:

CR 777/CAT CREEK ROAD @ CAT CREEK OVERFLOW SW OF BARRETTS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789
MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW LOCL

CONST 1997

$

709

FED SHARE $

567

GA. SHARE $

142

OTH SHARE $

PE 1998 ROW LOCL CONST

$

10

AFTER 99

LOWNDES 442790
STATUS:

CR 777/CAT CREEK ROAD @ CAT CREEK APP 3 MI SW OF BARRETTS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398
MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1999
ROW LOCL CONST

$

11

AFTER 99

COUNTY
p" ~ 'J..l<"

DESCRIPTION
r: .. .-- ......~ .... .:. --..ci..i..li.

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

.S0UrrP GEORGI

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

LOWNDES 450430
STATUS:

SR 7/US 41 AT JAMES BECK OVERPASS IN VALDOSTA INTERSECTION IMPROVEMENT / SAFETY LENGTH{Miles/km): .20/.32180- EXIST. LANES: 4 /PROPOSED LANES: MANAGER: J. SHEFFIELD
VALDOSTA SGN FOR UTIL 5-20-93;LOWNDES NO INVOLVED UTILITIES

CONG DIST. 2 4
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS

LOWNDES 450450
STATUS:

N OAK ST FM BAYTREE RD TO 500' N BAYTREE FOR RIGHT TURN LN

TURN LANES / SAFETY

CONG DIST. 2

LENGTH(Miles/km): .32/.51488- EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: J. SHEFFIELD

FUND SOURCE: HWY. SAFETY

VALDOSTA SGN ROW & UTIL 5-20-93;LOWNDES NO INV UTILITIES.

FEDERAL HIGHWAY ADMIN FUNDS

* ~ FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996
Fag<" 209

FISCAL YEAR

COST ESTS

PE 1996 UNDERWAY

ROW 1995 UNDERWAY

CONST 1997

$

208

FED SHARE $ 187

GA. SHARE $

21

OTH SHARE $

PE NONE

$

0

ROW LOCL

CONST 1997

$

131

FED SHARE $ 118

GA. SFFo?::S $

13

OTH SHARE $

~~---'

'5~~-:"':'::".J

~~~;;~

~<E.J:n~~;

~-...c.:~_-;;J

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 210

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTH GEORGIA

FISCAL

COST

-P--. I-.-N--O-. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

TIFT

I-75 FM CR 246/COOK TO CR 204/TIFT .. SEE COOK COUNTY- 410530

PE NONE

$

0

41053X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE $

0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0 .

CONST NONE $

0

MANAGER: UNKNOWN

FUND SOURCE: NAT'L HIGHWAY

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

410530 IS AN ASSOCIATED PROJECT.

TIFT 422170
STATUS:

SR 125/TIFTON FM 20TH ST TO 40TH ST

TURN LANES / SAFETY

CONG DIST. 8

LENGTH(Miles/km): 1.10/1.76990- EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: J. SHEFFIELD

FUND SOURCE: SURFACE TRANSPORT.

REQ TIFTON DO UTILITIES 10-20-92;TIFT NO INVOLVED UTILITIES.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1998 $

50

CONST 1999 $ 1963

FED SHARE $ 1570

GA. SHARE $ 393

OTH SHARE $

TIFT 422320
STATUS:

SR 520/US 82 FM MAGNOLIA DR EAST TO CENTRAL AVE/TIFTON RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. LENGTH(Miles/km): .95/1.52855 MANAGER: J. SHEFFIELD CITY SGN DO UTILITIES UP TO $75K 2-27-96.

TIFT 431700
STATUS:

SR 35/US 319 OVER ALAPAHA RIVER @ TIFT-IRWIN COUNTY LINE
REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .24/.38616
MANAGER: J. SHEFFIELD REQ TIFT DO UTIL 12-7-95; IRWIN SGN UTIL 12-14-95

CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1997 UNDERWAY
ROW 1998 $ 750 CONST 1999 $ 1009
FED SHARE $ 807 GA. SHARE $ 202 OTH SHARE $

PE 1998
ROW CONST

$

10

AFTER 99

AFTER 99

TIFT 471221
STATUS:

TIFTON BIKE LANES, SIDEWALKS AND HIKING TRAILS

BICYCLE/FED. FACILITY / ENHANCEMENT

CONG DIST. 8

LENGTH(Miles/km): 20.17/32.45353 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL ROW LOCL CONST 1998 $
FED SHARE $
GA. SHARE $ OTH SHARE $

1065 852
213

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

SOUTH GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

TURNER 410245
STATUS:

I-75 FM TIFT COUNTY LINE TO SR 159; & 41Y245 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 11.10/17.85990 MANAGER: B. FERGUSON TURNER SGN 4-20-92 UTILITIES; ASHBURN SGN 6-12-92 PUB UTIL

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 41Y245 IS AN ASSOCIATED PROJECT.

TURNER 410250
STATUS:

I-75 FM SR 159 NEAR ASHBURN TO 1-MI S OF CR 117/CRISP&"Y" RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. L~NGTH(Miles/km): 16.50/26.54850
MANAGER: B. FERGUSON REQ TURNER AND CRISP DO UTILITIES 4-8-92.

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 41025X IS AN ASSOCIATED PROJECT.

TURNER 410590
STATUS:

I-75 RA 9 & 10 UPGRADE REST AREA

REST AREA / RECST. OR REHAB.

CONG DIST. 8

LENGTH{Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: J. GARLAND

FUND SOURCE: I-STATE MAINT.

NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

TURNER 431300
STATUS:

SR 32 OVER LITTLE SAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): 1.00/1.60900 MANAGER: J. SHEFFIELD TURNER COUNTY SIGNED FOR UTILITIES 8-1-95

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TURNER 431570
STATUS:

SR 112 @ LITTLE RIVER 3 MILES WEST OF SYCAMORE REHABILITATION OF THE EXISTING BRIDGE{S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: J. SHEFFIELD TURNER COUNTY SIGNED FOR UTILITIES 2-7-95

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 211

FISCAL YEAR

COST ESTS

PE 1995 ROW 1998 CONST

UNDERWAY $ 3000 AFTER 99

PE 1987 ROW 1997 CONST

UNDERWAY $ 13000 AFTER 99

PE 1994 UNDERWAY

ROW 1996 UNDERWAY

CONST 1999

$ 9055

FED SHARE $ 8150

GA. SHARE $

906

OTH SHARE $

PE 1995 UNDERWAY

ROW 1997

$

1

CONST 1998

$

385

FED SHARE $

308

GA. SHARE $

77

OTH SHARE $

PE 1996 ROW 1999 CONST

UNDERWAY

$

10

AFTER 99

TURNER 431580
STATUS:

SR 112 @ ASHBURN BRANCH 1.6 MILES SW OF ASHBURN REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: J. SHEFFIELD TURNER COUNTY SIGNED FOR UTILITIES 2-7-95

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW 1999 CONST

UNDERWAY

$

10

AFTER 99

TURNER 431590
STATUS:

SR 112 @ DANIELS CREEK SOUTHWEST OF ASHBURN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .19/.30571 MANAGER: J. SHEFFIELD TURNER SGN FOR UTILITIES 2-16-95; ASHBURN NOT APPLICABLE

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 ROW 1999 CONST

UNDERWAY

$

1

AFTER 99

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 212

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTH GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

TURNER SR 112 @ BIG BRANCH 6.1 MILE SOUTHWEST OF SYCAMORE

PE 1996 UNDERWAY

431600 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.

CONG DIST. 8

ROW 1999

$

10

LENGTH(Miles/km): .20/.32180

CONST

AFTER 99

MANAGER: J. SHEFFIELD

FUND SOURCE: BRIDGE PROGRAM

STATUS: TURNER COUNTY SIGNED FOR UTILITIES 2-7-95

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

SOUTHEAST GEORGIA REGIONAL DEVELOPMENT CENTER
Atkinson Bacon
Brantley Charlton
Clinch Coffee Pierce Ware

l

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 213

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BACON SR 32/ALMA @ HURRICANE CREEK

PE NONE

$

0

520910 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.

CONG DIST. 1

ROW NONE

$

0

LENGTH(Miles/km): .08/.12872

CONST 1997

$ 1329

MANAGER: TONY COLLINS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 1063

STATUS: BACON SIGNED UTILITIES 6-17-91

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

266

OTH SHARE $

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P. I. NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

SOUTHEAST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

BRANTLEY CR 11 @ MILL CREEK WEST OF HOBOKEN 570925 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Mi1es/km): .20/.32180 MANAGER: TONY COLLINS STATUS: BRANTLEY SGN DO ROW, UTILITIES & DETOURS 10-19-93

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 214

FISCAL YEAR

COST

PE 1994 UNDERWAY

ROW LOCL

CONST 1998 $ 243

FED SHARE $ 194

GA. SHARE $

49

OTH SHARE $

COUNTY P. I. NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

SOUTHEAST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

CHARLTON SR 94 OVER ST MARYS RIVER AT FLORIDA STATE LINE 531300 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .60/.96540 MANAGER: TONY COLLINS STATUS: BI-STATE AGREEMENT SGN BY FLORIDA 5/1/96.

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 215

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1997

$

2

CONST 1998

$ 2742

FED SHARE $ 1371

GA. SHARE $

OTH SHARE $ 1371

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 216

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLINCH SR 38/US 84 @ SUWANNOOCHEE CREEK

PE 1992

UNDERWAY

422055 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.

CONG DIST. 8

ROW NONE $

0

LENGTH(Miles/km): .20/.32180

CONST 1998

$ 1245

MANAGER: KEVIN HOSEY STATUS: REQ LANIER & CLINCH DO UTILITIES 6-3-92

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $

996

GA. SHARE $ 249

42205Y IS AN ASSOCIATED PROJECT.

OTH SHARE $

CLINCH 442715
STATUS:

SR 177 @ SWEETWATER CREEK TO STEPHEN C FOSTER ST PARK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007 MANAGER: J. SHEFFIELD CLINCH SGN FOR UTILITIES 5-18-95; NO UTIL INVOLVED 5-18-95

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1997 UNDERWAY

ROW 1998 $

10

CONST 1999

$

460

FED SHARE $ 368

GA. SHARE $

92

OTH SHARE $

"'-

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 217

PROJECT LISTING BY ROC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHEAST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COFFEE SR 32/DOUGLAS FM W CL TO E/SR 206 .. INCL 1-WAY PAIR 421340 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 8

PE 1992 ROW 1995

UNDERWAY UNDERWAY

LENGTH(Miles/km): 3.57/5.74413

CONST 1999 $ 4402

MANAGER: M. REYNOLDS STATUS: CITY OF DOUGLAS SIGNED 5/8/89 FOR UTILITIES.

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 3522 GA. SHARE $ 880

OTH SHARE $

COFFEE 421345
STATUS:

SR 32 FM W/CR 296 EAST TO WEST CITY LIMITS OF DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.13/6.64517 MANAGER: M. REYNOLDS COUNTY SGN UTIL 11-19-91;CITY/DOUGLAS SGN UTIL 11-1-91.

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1997 CONST

UNDERWAY $ 3947 AFTER 99

COFFEE 422350
STATUS:

SR 135 AT MCDONALD ROAD IN DOUGLAS

TURN LANES / SAFETY

CONG DIST. 8

LENGTH(Miles/km): .74/1.19066 -EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: J. SHEFFIELD

FUND SOURCE: NAT'L HIGHWAY

CITY OF DOUGLAS SGN FOR ROW, UTILITIES 7-19-94

OTO

FEDERAL HIGHWAY ADMIN FUNDS

COFFEE 431610
STATUS:

SR 158 @ CR 553/MCDONALD RD IN DOUGLAS TURN LANES / SAFETY LENGTH(Miles/km): .50/.80450- EXIST. LANES: 4
MANAGER: J. SHEFFIELD CITY/DOUGLAS SGN 10-24-94 FOR ROW & UTILITIES

/PROPOSED

LANES:

CONG DIST. 8 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

COFFEE 442600
STATUS:

SR 158 AT SHIRLEY AVENUE IN DOUGLAS

TURN LANES / SAFETY

CONG DIST. 8

LENGTH(Miles/km): .50/.80450- EXIST. LANES: 4 /PROPOSED LANES: 5

MANAGER: J. SHEFFIELD

FUND SOURCE: HWY. SAFETY

CITY OF DOUGLAS SGN ROW & UTILITES 7-19-94.

OTO

FEDERAL HIGHWAY ADMIN FUNDS

COFFEE 450380
STATUS:

SR 206/PERIMETER RD FM SR 32 TO SR 31 IN DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 1.80/2.89620
MANAGER: J. SHEFFIELD COFFEE SGN 10-14-93 PUBLIC UTIL; DOUGLAS SGN 10-11-93 UTIL

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

COFFEE 471080
STATUS:

CR 598 OVER BEAR CREEK @ HILLARDS LAKE 5 MILES SW OF DOUGLAS REPLACEMl."~l'J' 0F ~!II!' EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Milea/i<mj: .20/.32180 MANAGER: J. SHEFFIELD COFFEE SGN DO ROW, UTIL & DETOURS 9-29-94.

CONG DIST. 8
FUND SOURCE: PRTDGE PROGRAM FEDERAL HIGHWAY ADMIN FlJl~L;;:;

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1994 UNDERWAY ROW LOCL CONST 1997 $ 239
FED SHARE $ 239 GA. SHARE $ OTH SHARE $

PE 19-95 UNDERWAY

ROW LOCL

CONST 1997

$

157

FED SHARE $ 141

GA. SHARE $

16

OTH SHARE $

PE 1994 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$

173

FED SHARE $

173

GA. SHARE $

OTH SHARE $

PE 1992 UNDERWAY
ROW 1995 UNDERWAY
CONST 1999 $ 2255 FED SHARE $ 1804 GA. SHARE $ 451 OTH SHARE $

PE 1995 UNDERWAY

ROW LOCL

CONST 1997

$

181

FED SHARE $ 145

GA. SHARE $

36

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 218

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHEAST GEORGIA

FISCAL

COST

P.I.NO.

PROJECT DATA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

-----------------------------------------------------------------------------------------------------------------

Y-E-A-R--------E--ST--S--

COFFEE RESTORE RR DEPOT & ASHLEY-SLATER HOUSE FOR MUSEUM & WELCOME

_, l9':J7

y

100

471220 HISTORIC FACILITIES / ENHANCEMENT

rn1--1r; r.~~rr

ROW LOCL

LENGTH(Miles/km): .00/.00000- ,... ~,..m ---, _, 1 i:'b.Vl?OSED LAN!":';; v

CONST 1997

$ 1000

Hl'."J;rq~~n

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $

800

TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

OTH SHARE $

200

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

~~:..:J

COUNTY P. I . NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

SOUTHEAST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

PIERCE 532470
STATUS:

SR 15 OVER BURNEY BRANCH IN BLACKSHEAR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007 MANAGER: TONY COLLINS REQ CITY DO UTILITIES & COUNTY DO PUBLIC UTIL 9-21-94

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 219

FISCAL YEAR

COST ESTS

PE 1994

UNDERWAY

ROW 1996 UNDERWAY

CONST 1998

$

552

FED SHARE $

442

GA. SHARE $

110

OTH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY ROC FY 1997/FY 1999

SOUTHEAST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

WARE 521530
STATUS:

SR 4BU/US1/WAYCROSS FM N/BLACKSHEAR AV TO CR 465 @ JAMESTOWN RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.30/2.09170 MANAGER: TONY COLLINS REV REQ WARE DO UTILITIES 8/15/96.

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

WARE 522060
STATUS:

US82/84 CONN. FM CORRIDOR Z TO US 84/FRANCIS ST.

RAMP / NEW CONSTRUCTION

CONG DIST. 1

LENGTH(Miles/km): .10/.16090- EXIST. LANES: 4 /PROPOSED LANES: 5

MANAGER: TONY COLLINS

FUND SOURCE: NAT'L HIGHWAY

REQ CITY OF WAYCROSS DO UTILITIES 10-31-95

FEDERAL HIGHWAY ADMIN FUNDS

WARE 570970
STATUS:

ALONG SR 4 FROM L.S. WALKER SP TO WAYCROSS & LANDSCAPING BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: C. CARTER LGPA TO BE DONE BY CONTRACT

CONG DIST. 1 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 220

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY
ROW 1998 $ 1500 CONST 1999 $ 2140
FED SHARE $ 1712 GA. SHARE $ 428 OTH SHARE $

PE 1996 UNDERWAY

ROW LOCL

CONST 1998 $ 121

FED SHARE $

97

GA. SHARE $

24

OTH SHARE $

PE LOCL
ROW NONE $ CONST 1997 $
FED SHARE $
GA. S~ARE $ OTH SHARE $

0 1250 1000
250

SOUTHWEST GEORGIA REGIONAL DEVELOPMENT CENTER
Baker Calhoun Colquitt Decatur Dougherty
Early Grady
Lee Miller Mitchell Seminole Terrell Thomas Worth

SOUTHWEST GEORGIA

10 0

10

SCALE IN MILES

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 221

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BAKER

SR 91 @ ICHAWAYNOCHAWAY CREEK APP 3 MI N OF JCT SR 253

PE 1998

$

13

431710 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.

CONG DIST. 2

ROW

AFTER 99

LENGTH(Miles/km): .30/.48270

CONST

AFTER 99

MANAGER: J. SHEFFIELD

FUND SOURCE: BRIDGE PROGRAM

STATUS: BAKER SGN DO UTILITIES 4-16-96.

FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 222

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-E-G-IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--

CALHOUN SR 37 @ KEEL CREEK 3 MI S OF LEARY

PE 1997

UNDERWAY

431650 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789

CONG DIST. 2

ROW 1998 CONST

$

11

AFTER 99

MANAGER: J. SHEFFIELD

FUND SOURCE: BRIDGE PROGRAM

STATUS: CALHOUN SIGNED FOR UTILITIES 5-15-95

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 223

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

FISCAL

COST

-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COLQUITT SR 37 @ LITTLE CREEK 5 MILES WEST OF JCT SR 111

PE 1996 UNDERWAY

431540 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 2

ROW 1998 $

1

LENGTH(Miles/km): .50/.80450

CONST 1999

$

442

MANAGER: J. SHEFFIELD

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 354

STATUS: COLQUITT COUNTY SIGNED FOR UTILITIES 11-21-94

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

88

OTH SHARE $

COLQUITT CR 493/FUNSTON-SALE CITY @ LITTLE CREEK APP 1 MI NW FUNSTON 442750 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: J. SHEFFIELD STATUS: COLQUITT SIGNED FOR ROW, UTILITIES & DETOURS 12-18-95

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW LOCL CONST

$

10

AFTER 99

COLQUITT FM LOWER MEIGS RD IN MOULTRIE S TO US 319 BP AND TO AIRPORT 471030 BICYCLE/FED. FACILITY / ENHANCEMENT
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: STEVE YOST STATUS: LGPA TO BE DONE BY CONTRACT

CONG DIST. 8 & 2 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW NONE

$

0

CONST 1997

$

568

FED SHARE $

454

GA. SHARE $

OTH SHARE $ 114

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 224

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DECATUR SR 38/US 84 EBL @ SPRING CREEK IN WEST SECTION OF BRINSON

PE 1996

UNDERWAY

422520 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 2

ROW 1998

$

1

LENGTH(Mi1es/km): .31/.49879

CONST 1999

$ 1269

MANAGER: J. SHEFFIELD

.FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 1015

STATUS: BRINSON SGN DO UTILITIES 5-15-96;DECATUR SGN DO UTL 11-28-95

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

254

OTH SHARE $

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 225

PROJECT LISTING BY ROC FY 1997IFY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

FISCAL

COST

-P--.I-.-N--O-. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DOUGHERT 4D1015

TRANSIT TRANSIT

PVRCOHJ. E1 CFTASREIB

XS.,RADIO CAPITAL

S,

PARA VCH.,BUS

SHLT.,FACT.IMPRV

CONG DIST. 2 & 8

FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH

CAPITAL 1997

$ 678

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

610

STATUS: LGPA NOT APPLICABLE

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

OTH SHARE $

68

DOUGHERT CAPT MANT.,MNT.EQP.,COMP.SUPP.,OFF.FURN.,RADIO SYS.,PARAVCHS
4D4013 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
STATUS: PARATRANSIT VCR AND MAINT.TOOLS

CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1998

$ 501

FED SHARE $ 401

GA. SHARE $

50

OTH SHARE $

50

DOUGHERT CAPT.MAINT.,MNT.EQUP&TLS.,COMPUTER SUPP.,OFF.FURN&EUIP.RADIO
4D4014 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH STATUS:

CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1997

$ 456

FED SHARE $ 365

GA. SHARE $

45

OTH SHARE $

46

DOUGHERT PUBLIC TRANSIT SERVICE FOR ALBANY 4D4019 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
STATUS:

CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1997 $ 834

FED SHARE $ 417

GA. SHARE $

OTH SHARE $

417

DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY 4D4020 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:

CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1998

$

FED SHARE $

GA. SHARE $

OTH SHARE $

1070 416
654

DOUGHERT BUS SHELT.,FAREBXS.,RADIOS,PARATRN VCH.,FACT.IMPRVE 4D4023 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
STATUS:

CONG DIST. 8 & 2

CAPITAL 1998

$ 517

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

414

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

52

OTH SHARE $

52

DOUGHERT CAP.MNT.,MANT.TLS&EQP.,COMP.SUPP.,OFF.EQP.,RADIOS,BUS BNCH., 404024 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: MANAGER: STEVE KISH
STATUS: PARAVCH.,TRANSIT VCH.,FREBXS

CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

CAPITAL 1999

$ 341

FED SHARE $ 273

GA. SHARE $

34

OTH SHARE $

34

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 226

PROJECT LISTING BY ROC FY 1997IFY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

FISCAL

COST

-P--.I-.N--O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DOUGHERT TRANSIT VCH.,FREBXS.,RADIOS,PARATRNST.VCH.,BUS SHELTERS,

404025 TRANSIT PROJECTS I CAPITAL

CONG DIST. 2 & 8

FUNDS RECIPIENT:

CAPITAL 1999

$ 357

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $ 286

STATUS: FACIT.IMPROVEMENTS

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

36

OTH SHARE $

36

DOUGHERT TRANSIT SERVICE FOR ALBANY 404026 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ALBANY TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:

CONG DIST. 8 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1999 $ FED SHARE $ GA. SHARE $
OTH SHARE $

1119 316
803

DOUGHERT WIC LIFT FOR TRANSIT AND PARATRANSIT VEHICLES
409001 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ALBANY TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:

CONG DIST. 8 & 2

CAPITAL 1997

$

31

FUND SOURCE: URBAN TRANSIT

FED SHARE $

28

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

1

OTH SHARE $

2

DOUGHERT WIC LIFT FOR TRANSIT AND PARATRANSIT VEHICLES 4D9002 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ALBANY TRANSIT SYSTEM
MANAGER: STEVE KISH
STATUS:

CONG DIST. 8 & 2

FUND SOURCE: URBAN TRANSIT

CAPITAL 1998

$

31

FED SHARE $

28

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

1

OTH SHARE $

2

DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
4V7011 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY COUNTY
MANAGER: STEVE KISH
STATUS:

CONG DIST. 8 & 2

CAPITAL 1997

$

80

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

64

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

8

OTH SHARE $

8

DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 4V7012 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA
MANAGER: STEVE KISH
STATUS:

CONG DIST. 8 & 2

CAPITAL 1998

$

83

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $

66

FEDERAL TRANSIT ADMIN FUNDS

GA . .$HARE $

8

OTH SHARE $

8

DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 4V7013 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH
STATUS:

CONG DIST. 8 & 2

CAPITAL 1999

$

87

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

70

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

8

OTH SHARE $

9

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

SOUTHWEST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

DOUGHERT PHILEMA RD/SR 91 @ JEFFERSON ST/SR 133 IN ALBANY 421425 LANDSCAPING / ENHANCEMENT
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: D. CHURCH STATUS: CO SGN CONTRACT FOR PE, UTILITIES, 50% CONSTRUCTION 11-8-94

ALBANY TIP # H/R-95-10 CONG DIST. 8 s
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

DOUGHERT SR 62 @ COOLEEWAHEE CREEK APP 5 MI W OF JCT SR 91 431455 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .22/.35398 MANAGER: J. SHEFFIELD STATUS: REQ DOUGHERTY COUNTY DO UTILITIES 5-8-95

ALBANY TIP # B-95-3 CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 227

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST 1997

$

62

FED SHARE $

31

GA. SHARE $

OTH SHARE $

31

PE 1998 ROW 1999 CONST

$

10

$

11

AFTER 99

DOUGHERT SR 3/US19 NBL,SBL@ ATLANTIC GULF/GA FLA RR S OF US 82 431620 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .23/.37007 MANAGER: J. SHEFFIELD STATUS: REQ DOUGHERTY AND ALBANY DO UTILITIES 2-23-95
DOUGHERT CR 539/DAWSON RD@ SR 520/US 82/LIBERTY XWAY ... & LEE CO 450400 BRIDGES / NEW CONSTRUCTION
LENGTH(Miles/km): 1.50/2.41350 MANAGER: D. CHURCH STATUS: DOUGHERTY & LEE SGN ROW & UTIL 12/91;ALBANY NO INV UTILITIES
DOUGHERT SR 234/GILLIONVILLE RD FM EIGHT ML RD TO LOCKETT STATION RD 450490 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.17/3.49153 MANAGER: D. CHURCH STATUS:

ALBANY TIP # B-95-2 CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 UNDERWAY

ROW 1998 $

30

CONST 1998 $ 1176

FED SHARE $

941

GA. SHARE $ 235

OTH SHARE $

ALBANY TIP # H/R-95-7 CONG DIST. 8
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 45040X IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW LOCL

CONST 1997 $ 4397

FED SHARE $ 3518

GA. SHARE $

879

OTH SHARE $

ALBANY TIP # H/R-95-6 CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW LOCL
CONST

$ 173 AFTER 99

DOUGHERT SR 133/BROAD AVE FROM THE FLINT RIVER TO BROADWAY STREET 450530 RECONSTRUCTION & WIDENING FROM 3 LANES TO 4 LANES.
LENGTH(Miles/km): .27/.43443 MANAGER: D. CHURCH
STATUS:

ALBANY TIP # H/R-95-9 CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1998 ROW LOCL CONST

$

40

AFTER 99

DOUGHERT SR 133/BROAD AVE. @ FLINT RIVER ALBANY - DOWNTOWN 450535 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 3 TO 4 LANES.
LENGTH(Miles/km): .34/.54706 MANAGER: D. CHURCH
STATUS:

ALBANY TIP # B-95-1 CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1998 ROW CONST

$

115

AFTER 99

AFTER 99

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

SOUTHWEST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

DOUGHERT CLARK AVE EXT FM SR 62 - SR 133 INT NW TO E OF SWIFT/ALBANY 450540 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1.86/2.99274
MANAGER: D. CHURCH STATUS:

ALBANY TIP # H/R-95-8 CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 228

FISCAL YEAR

COST ESTS

PE 1998 ROW LOCL CONST

$

60

AFTER 99

~OUGHERT DOWNTOWN ENHhl.CEMENT OF ALBANY/THRONATEESKA DEPOT RENOVATION 470910 MISCELLANEOUS IMPROVEMENTS / ENHANCEMENT
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: T. MCQUEEN STATUS: TO BE DONE BY CONTRACT

ALBANY TIP # TSM-2 CONG DIST. 8
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

DOUGHERT D'TOWN ENHANCEMENT OF ALBANY/STREETSCAPE

ALBANY TIP # TSM-2

470914 MISCELLANEOUS IMPROVEMENTS / ENHANCEMENT

CONG DIST. 8

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: T. MCQUEEN

FUND SOURCE: TRANS. ENHANCE.

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

DOUGHERT D'TOWN ENHANCEMENT OF ALBANY/BIKE TRAILS

ALBANY TIP # TSM-2

470916 MISCELLANEOUS IMPROVEMENTS / ENHANCEMENT

CONG DIST. 8

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: T. MCQUEEN

FUND SOURCE: TRANS. ENHANCE.

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE LOCL

ROW NONE $

0

CONST 1997

$

270

FED SHARE $ 150

GA. SHARE $

OTH SHARE $

120

PE LOCL

ROW 1997

$

140

CONST 1997

$

998

FED SHARE $ 770

GA. SHARE $

OTH SHARE $ 228

PE LOCL

ROW 1997 $

57

CONST 1997

$

711

FED SHARE $ 558

GA. SHARE $

OTH SHARE $

153

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 230

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

GRADY SR 111 @ SOFKEE CRK N/CR 81

PE 1992 UNDERWAY

422180 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 2

ROW 1996 UNDERWAY

LENGTH(Miles/km): .75/1.20675

CONST 1997

$

733

MANAGER: J. SHEFFIELD

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

586

STATUS: GRADY SIGNED 2-18-92 FOR UTILITIES (NOT TO EXCEED $1,500.)

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 147

OTH SHARE $

GRADY 431330
STATUS:

SR 111 OVER TURKEY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .75/1.20675 MANAGER: J. SHEFFIELD GRADY COUNTY SIGNED FOR UTILITIES 12-7-93

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$

547

FED SHARE $ 438

GA. SHARE $ 109

OTH SHARE $

GRADY 442550
STATUS:

SR 188 OVER W. BRANCH BARNETTS CK NE OF CAIRO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .75/1.20675 MANAGER: J. SHEFFIELD GRADY SGN FOR UTILITIES 10-18-94

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1997

$

1

CONST 1998 $ 541

FED "SHARE $

433

GA. SHARE $ 108

OTH SHARE $

GRADY 442552
STATUS:

SR 188 OVER BARNETTS CREEK/THOMAS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .75/1.20675
MANAGER: J. SHEFFIELD REQ THOMAS DO UTILITIES 9-21-94; GRADY SGN FOR UTIL 10-18-94

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 44255X IS AN ASSOCIATED PROJECT.

PE 1994 UNDERWAY

ROW 1997 $

1

CONST 1998 $ 549

FED SHARE $ 439

GA. SHARE $

110

OTH SHARE $

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

SOUTHWEST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

EARLY 421640
STATUS:

SR 1/US 27 @ WAMBLE CREEK SOUTH OF BLAKELY REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .50/.80450 MANAGER: M. GANNAWAY EARLY COUNTY SIGNED FOR UTILITIES 5-16-91.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

EARLY 422090
STATUS:

SR 62/BLAKELY FM WEST OF SR 200 TO EAST OF SR 62 BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.69/2.71921
MANAGER: J. SHEFFIELD BLAKELY SGN DO UTIL 12-1-92;EARLY NO INVOLVED UTILITIES.

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 229

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1999 $ 230

FED SHARE $ 184

GA. SHARE $

46

OTH SHARE $

PE 1992 ROW 1999 CONST

UNDERWAY

$

10

AFTER 99

EARLY 431320
STATUS:

SR 1 OVER BLUE CREEK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .75/1.20675 MANAGER: M. GANNAWAY EARLY SGN FOR UTILITIES 8-2-94

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

PE 1994

UNDERWAY

ROW NONE $

0

CONST 1999

$

369

FED SHARE $ 295

GA. SHARE $

74

OTH SHARE $

~---~-;

!!-___ .J

Ut..::: ___)

~--'- :.U

. . . e:::~- _:J

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

P. I. NO.

PROJECT DATA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

LEE

SR 91/PHILEMA RD FM DOUGHERTY CL TO GRAVES SPRING RD/CR 5

* ALBANY TIP H/R-95-3

421870 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 8

LENGTH(Miles/km): 2.81/4.52129

MANAGER: M. GANNAWAY

FUND SOURCE: SURFACE TRANSPORT.

STATUS: LEE COUNTY SIGNED 2/6/90 FOR ROW AND UTILITIES.

FEDERAL HIGHWAY ADMIN FUNDS

20-Sep-1996 Page 231

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW LOCL

CONST 1997

$ 3263

FED SHARE $ 2610

GA. SHARE $ 653

OTH SHARE $

LEE

CR 539/DAWSON RD@ SR 520 ... SEE DOUGHERTY CO- 450400

ALBANY TIP # H/R-13

PE NONE

$

0

45040X UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

ROW NONE

$

0

LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: D. CHURCH

FUND SOURCE: DEMONSTRATION PROGRAM

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

450400 IS AN ASSOCIATED PROJECT.

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY RDC FY 1997/FY 1999

SOUTHWEST GEORGIA

REGIONAL DEVELOPMENT COMMISSION

COMMENTS

MITCHELL CR 307 AT BIG SLOUGH AND OVERFLOW IN NORTH CAMILLA 442740 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .40/.64360 MANAGER: J. SHEFFIELD STATUS: CAMILLA SGN FOR ROW,UTIL & DETOURS 12/95; MITCHELL SGN 12/95

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MITCHELL RESTORE MITCHELL DRUG STORE/VISITOR CENTER IN CAMILLA
471020 HISTORIC FACILITIES / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: STEVE YOST
STATUS: LGPA TO BE DONE BY CONTRACT

CONG DIST. 2 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

20-Sep-1996 Page 232

FISCAL YEAR

COST ESTS

PE 1998 ROW LOCL CONST

$

10

AFTER 99

PE LOCL

ROW LOCL

CONST 1997

$

371

FED SHARE $ 297

GA. SHARE $

OTH SHARE $

74

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 233

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-ST--S--

TERRELL SR 49 OVER KINCHAFOONEE CREEK/ ALSO SUMTER CO

PE 1992 UNDERWAY

421980 REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES.

CONG DIS.T. 2

ROW 19"97 $

8

LENGTH{Miles/km): 1.50/2.41350

CONST 1998 $ 2212

MANAGER: J. SHEFFIELD

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 1770

STATUS: TERRELL SGN 8-7-91 AND SUMTER SGN 8-8-91 FOR UTILITIES.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

442

42198X IS AN ASSOCIATED PROJECT.

OTH SHARE $

TERRELL 442570
STATUS:

SR 55 REALIGNMENT FM MP 6.6 TO MP 7.0 NORTH OF HEROD RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. LENGTH(Miles/km): .40/.64360 MANAGER: J. SHEFFIELD TERRELL SIGNED TO DO UTILITIES 1-10-94

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.

PE 1996 UNDERWAY

ROW 1996 UNDERWAY

CONST 1997

$

122

FED SHARE $

98

GA. SHARE $

24

OTH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 234

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

THOMAS SR 38/US 84 BUS @ ATLANTIC-GULF RAILROAD NW/THOMASVILLE

PE 1992 UNDERWAY

421970 REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES.

CONG DIST. 2

ROW 1998

$

50

LENGTH{Miles/km): 1.00/1.60900 MANAGER: J. SHEFFIELD

FUND SOURCE: BRIDGE PROGRAM

CONST 1999

$ 3146

FED SHARE $ 2517

STATUS: THOMAS SGN PUB UTIL 2-12-92; THOMASVILLE SGN 2-12-92 UTIL.

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

629

OTH SHARE $

THOMAS 431090
STATUS:

SR 33 @ PISCOLA CREEK NORTH OF BOSTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH{Miles/km): .50/.80450 MANAGER: J. SHEFFIELD THOMAS COUNTY SIGNED FOR UTILITIES 8-15-91

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1995 UNDERWAY

CONST 1997

$ 1160

FED SHARE $ 928

GA. SHARE $ 232

OTH SHARE $

THOMAS 442500
STATUS:

METCALFE ROAD/CR 384 OVER PINE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .23/.37007 MANAGER: J. SHEFFIELD THOMAS COUNTY SGN 9-1-92 FOR ROW, UTILITIES & DETOURS

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW LOCL

CONST 1998 $ 329

FED SHARE $ 263

GA. SHARE $

66

OTH SHARE $

THOMAS 44255X

SR 188 OVER BARNETTS CREEK SEE GRADY COUNTY--442552

UNKNOWN / UNKNOWN

CONG DIST. 0 & 0

LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: BRIDGE PROGRAM

PE NONE $

0

ROW NONE $

0

CONST NONE $

0

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

442552 IS AN ASSOCIATED PROJECT.

THOMAS 442720
STATUS:

SR 188 @ HORSE CREEK APP 2 MI W OF OCHLOCKNEE REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES.
LENGTH{Miles/km): .20/.32180 MANAGER: J. SHEFFIELD THOMAS SIGNED FOR UTILITIES 5-16-95.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1997

UNDERWAY

ROW 1998 $

10

CONST 1999

$

199

FED SHARE $ 159

GA. SHARE $

40

OTH SHARE $

THOMAS 450460
STATUS:

CS 245/PINE TREE BLVD @ OLIVE CK/THOMASVILLE REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. LENGTH{Miles/km): . 75/1.20675
MANAGER: J. SHEFFIELD CO SGN 10-26-93 & CITY SGN 11-9-93 FOR ROW, UTIL & DETOURS

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW LOCL

CONST 1997

$

136

FED SHARE $ 109

GA. SHARE $

27

OTH SHARE $

*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

GEORGIA DEPARTMENT OF TRANSPORTATION

20-Sep-1996

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 235

PROJECT LISTING BY RDC FY 1997/FY 1999

COUNTY

DESCRIPTION

SOUTHWEST GEORGIA

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--

WORTH

CR 297 @ SWIFT CREEK APPROX. 2 MILES NE OF WARWICK

PE 1996 UNDERWAY

470895 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.

CONG DIST. 8

ROW LOCL

LENGTH(Miles/km): .21/.33789

CONST 1998

$

274

MANAGER: J. SHEFFIELD

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 219

STATUS: WORTH SGN 2-7-95 & CRISP SGN 2-14-95 ROW, UTIL & DETOURS

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

55

OTH SHARE $

* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.

r"7
'..;_ ~ )
04M097 04M098 04M099 04MB97 04MB98 04MB99 110231 110233 110250 110330 110400 110445 11044Y 11044Z 110462 110465 110470 110530 11Y231 11Y233 121600 121604 121740 121980 122150 12215X 122160 12216X 122230 122400 122420 122440 122450 122510 122560 122600 122720 122860 122870 12Y080 132040 132100 132160 132220 132360 132440 132470 132510 132540 132550 132560 13256X 132570 132600 132610 132620

Program Item Number Page Index for 1997 STIP by RDC

Page 150 Page 150 Page 150 Page 150 Page 150 Page 151 Page 35 Page 36 Page 197 Page 36 Page 109 Page 197 Page 104 Page 107
Page 107 Page 109 Page 109 Page 36 Page 36 Page 36 Page 197 Page 197 Page 116 Page 106 Page 197 Page 109 Page 193 Page 197 Page 115
Page 197 Page 115 Page 108 Page 108 Page 198 Page 203 Page 193 Page 36 Page 151
Page 190 Page 107 Page 198 Page 108 Page 111 Page 190 Page 36 Page 114 Page 37 Page 106 Page 111 Page 198 Page 116 Page 108 Page 190 Page 108 Page 109 Page 203

132640 132670 132690 141605 141805 141850 141970 141980 141990 142020 142030 142070 150210 150213 150215 15021X 15021Y 150270 170833 170843 170881 170900 170910 170925 171000 171001 171002 171020 171060 171070 171170 171210 171260 171330 171340 171341 171342 171350 171370 171371 171372 171380 17138X 1B9001 1B9002 1B9003 1C9001 1C9002 1C9003 1D1019 1D1020 1D1022 1D1023 1D1061 1D1062

Page 106 Page 190 Page 109
Page 106 Page 37 Page 111 Page 201 Page 201 Page 107 Page 194 Page 201 Page 105 Page 201 Page 193 Page 201 Page 193 Page 193 Page 37 Page 114 Page 111 Page 116 Page 112 Page 112 Page 193 Page 198 Page 198 Page 198 Page 116 Page 109 Page 198 Page 203 Page 37 Page 37 Page 37 Page 37 Page 38 Page 38 Page 38 Page 110 Page 113 Page 115 Page 108 Page 113 Page 142 Page 142 Page 142 Page 142 Page 142 Page 142 Page 191 Page 191 Page 191 Page 191 Page 191 Page 191

1D1063 1D1065 1Dl066 1Dl067 1D7147 1D7148 1D7149 1D7150 1V7007 1V7017 1V7018 1V7022 1V7023 210327 210360 210430 210440 210450 210530 210560 210565 210570 210610 210640 210660 210760 210800 21Y430 21Y440 220105 220107 220680 22118Z 221328 221329 221360 221532 221540 221550 221610 221762 221805 221810 221860 22186X 221935 221975 222040 222080 222140 222180 222190 22219X 222200 222210

page 1
Page 191 Page 192 Page 192 Page 192 Page 35 Page 35 Page 35 Page 35 Page 192 Page 35 Page 192 Page 35 Page 192 Page 54 Page 54 Page 54 Page 54 Page 54 Page 200 Page 199 Page 46 Page 55 Page 128 Page 200 Page 122 Page 55 Page 151 Page 55 Page 55 Page 55 Page 55 Page 55 Page 45 Page 58 Page 58 Page 195 Page 56 Page 122 Page 56 Page 195 Page 183 Page 46 Page 122 Page 46 Page 56 Page 183 Page 119 Page 200 Page 195 Page 46 Page 170 Page 51 Page 60 Page 128 Page 48

222220 222350 222370 222390 222450 222670 22Y390 231140 231145 23114X 231220 231240 231270 231310 231330 231450 231520 231960 231970 231980 232005 240809 242160 242165 242220 242290 242300 24230X 242315 245020 24502X 245100 245110 245120 245130 245140 24Y809 250475 250490 250510 250570 250590 262080 262410 262450 262570 270680 270681 270760 270815 270990 271000 271010 271110 271120 271122

Program Item Number Page Index for 1997 STIP by RDC

Page 183 Page 56 Page 56 Page 59 Page 181 Page 151 Page 59 Page 128 Page 48 Page 128 Page 200 Page 60 Page 181 Page 49 Page 49 Page 170 Page 177 Page 48 Page 48 Page 50 Page 122 Page 56 Page 118 Page 118 Page 52 Page 170 Page 183 Page 178 Page 202 Page 183 Page 182 Page 195 Page 195 Page 195 Page 201 Page 60 Page 56 Page 46 Page 57 Page 57 Page 57 Page 60 Page 46 Page 46 Page 52 Page 122 Page 195 Page 196 Page 181 Page 177 Page 49 Page 122 Page 200 Page 177 Page 57 Page 52

271124 271126 271128 271130 2B9001 2B9002 2B9003 2C9001 2C9002 2C9003 2D2016 2D2017 2D2018 2D2019 2D2020 2D2021 2V7021 2V7022 2V7023 310713 310980 311000 311120 311155
31138X 311400 311445 311460 311540
311560 311617 311630 311665 311740 311770 311780 311790 311840
311910 311970 315097
315098 315099 315U97 315U98 315U99 31YOOO 31Y713 321145 321530 321580 321610 321614 321616 321720

Page 59 Page 60 Page 47 Page 181 Page 142 Page 143
Page 143 Page 143 Page 143 Page 143 Page 53 Page 53 Page 53 Page 53 Page 53 Page 53 Page 53 Page 54 Page 54 Page 171 Page 171 Page 172 Page 39 Page 135 Page 161 Page 172 Page 135 Page 172 Page 180 Page 172 Page 179 Page 135 Page 166 Page 179
Page 135 Page 180 Page 63 Page 39 Page 172 Page 151 Page 151
Page 151 Page 152 Page 152 Page 152
Page 152 Page 172
Page 172 Page 39 Page 39 Page 131 Page 166
Page 166 Page 166 Page 66

321810 321964 322100 322250 322280 322350 322360 322430 322450 32245X 322530 322560 322570 322650 322670 322690 322830 331360 331520 33152X 331550 331610 331620 331740 331850 331860 331940 331970 331980 331990
332030 332050 332160 332170 332180 332280 332300 332310 332510 33A097 33A098 33A099 33C097 33C098 33C099 33CB97 33CB98 33D097 33D098 33D099 33DB97 33DB98 33DB99 33MS97 33MS98

page 2
Page 135 Page 20 Page 162 Page 66 Page 167 Page 20 Page 179 Page 169 Page 180 Page 175 Page 161 Page 175 Page 175 Page 20 Page 20 Page 169 Page 152 Page 39 Page 163 Page 40 Page 40 Page 168 Page 124 Page 63 Page 178 Page 175 Page 180 Page 163 Page 40 Page 40 Page 124 Page 163 Page 136 Page 63 Page 63 Page 168 Page 167 Page 133 Page 160 Page 152 Page 152 Page 153 Page 153 Page 153 Page 153 Page 153 Page 153 Page 153 Page 154 Page 154 Page 154 Page 154 Page 154 Page 154 Page 154

~
r~~

33MS99

~,. 33NS97

~.
L

33NS98

33NS99

342080

342340 ii!__ 342480

342621

342780

342790

342895

342900

342945

342950

342955

342960

343000

343010

350260

350685

350690

350750

350780

350790

350820

350840

350870

350875

350880

350960

350980

350990

351000

351060

351070

351080

351160

351170

363720

370781

370811

370824

370826

371030

371205

371210

37121X

371220

371230

371260

371280

371302

3713 06

3 713 08

37133 0

371420

Program Item Number Page Index for 1997 STIP by RDC

Page 155 Page 155 Page 155 Page 155 Page 173 Page 176 Page 163 Page 163 Page 133 Page 164 Page 168 Page 63 Page 63 Page 63 Page 64 Page 64 Page 124 Page 168 Page 136 Page 136 Page 136 Page 169 Page 136 Page 136 Page 173 Page 176 Page 136 Page 137 Page 137 Page 173 Page 64
Page 66 Page 137 Page 137 Page 176 Page 173 Page 173 Page 66 Page 162 Page 64 Page 179 Page 64 Page 64 Page 173 Page 164 Page 166
Page 167
Page 133 Page 163 Page 140 Page 141 Page 64 Page 65 Page 65 Page 65 Page 173

371440 371442 371444 371450 371452 371454 371456 371480 371481 37Y454 3AA097 3AA098
3AA099 3AAB97 3AAB98 3B9001
3B9002 3B9003 3C9001 3C9002 3C9003 3D3019 3D3020 3D3021 3D3022 3D3023 3D3024 3D3100 3V7004 3V7013 3V7018 3V7019 3V7020
3V7021 3V7022 3V7023 3V7024 3V7025 3V7026 3V7029 3V7030 410245
410250 41025X 410260 410420
410530
41053X 410590 410600 410620 410670 41Y260 421340 421345

Page 40 Page 40 Page 40 Page 174 Page 174 Page 160 Page 133 Page 167 Page 137 Page 160 Page 155 Page 155 Page 155 Page 156 Page 156 Page 143 Page 143 Page 144 Page 144 Page 144 Page 144 Page 134 Page 134 Page 171 Page 171 Page 134 Page 134 Page 171 Page 171 Page 20 Page 39 Page 175
Page 134 Page 171 Page 175 Page 134 Page 20 Page 39 Page 144 Page 175 Page 134 Page 211 Page 211 Page 165 Page 165 Page 206 Page 206 Page 210 Page 211 Page 206 Page 206 Page 156 Page 165 Page 217 Page 217

421425 421640 421720 421722 42172X 42172Y 421870 421970 421980 42198X 422055 422090 422170
422180 422280 422310 422320
422350 422510 422520 422580 431090 431180 431290 431300 431320 431330 431455 431520 431540
431570 431580 431590
431600 431610 431620 431650 431680 431690 431695 431700
431710 442500 442550 442552
44255X 442565
442570 442580 442600 442680 442682 442710 442715 442720

page 3
Page 227 Page 229 Page 205 Page 205 Page 208 Page 208 Page 231 Page 234 Page 233 Page 169 Page 216 Page 229 Page 210 Page 230 Page 208 Page 130 Page 210 Page 217 Page 205 Page 224 Page 156 Page 234 Page 204 Page 138 Page 211 Page 229 Page 230 Page 227 Page 138 Page 223 Page 211 Page 211 Page 211 Page 212 Page 217 Page 227 Page 222 Page 208 Page 130 Page 130 Page 210 Page 221 Page 234 Page 230 Page 230 Page 234 Page 208 Page 233 Page 204 Page 217 Page 205 Page 205 Page 132 Page 216 Page 234

442725 442740 442750 442760 442780 442790 450380 450400 45040X 450420 450430 450450 450460 450490 450530 450535 450540 470895 470910 470914 470916 471020 471030 471060 471080 471220 471221 4B9000 4B9001 4B9002 4C9000 4C9001 4C9002 4D1015 4D4013 4D4014 4D4019 4D4020 4D4023 4D4024 4D4025 4D4026 4D9001 4D9002 4V7011 4V7012 4V7013 511060 511080 511086 511087 51115X 511190 51119X 511245 511325

Program Item Number Page Index for 1997 STIP by RDC

Page 138 Page 232 Page 223 Page 207 Page 208 Page 202' Page 21':' Page 22~' Page 232_ Page 204 Page 209 Page 209 Page 234 Page 227 Page 227
Page 227 Page 228 Page 235 Page 228 Page 228 Page 228 Page 232 Page 223 Page 139 Page 217 Page 218 Page 210 Page 144 Page 144 Page 145 Page 145 Page 145 Page 145
Page 225 Page 225 Page 225 Page 225 Page 225
Page 225 Page 225 Page 226
Page 226 Page 226 Page 226
Page 226 Page 226 Page 226 Page 73 Page 70 Page 70 Page 70 Page 67 Page 67 Page 79 Page 81 Page 67

51132X 51132Z 511330 51Y060 51Y080 51Y086 520781 520890 520910 521270 521275 521495 521505 521508 521530 521770 521780 521800 521855 521860 521865 521867 521910 521970 522000 522005 522042 522060 522170 52217X 522240 522310 522320 522470 522490 522610 522620 522640 522660 522670 522690 522730 522800 522900 52Y770 531250 531260 531300 532390 532400 532470 532510 532560 532570 532630

Page 74 Page 79 Page 156 Page 74 Page 70 Page 70 Page 83 Page 81 Page 213 Page 68 Page 68 Page 74 Page 74 Page 74
Page 220 Page 74 Page 74 Page 68 Page 75 Page 75 Page 75 Page 75 Page 70 Page 68 Page 125 Page 120 Page 81 Page 220 Page 79 Page 75 Page 85 Page 81 Page 127 Page 68 Page 75 Page 75 Page 125 Page 68 Page 121 Page 76 Page 70
Page 81 Page 76 Page 117 Page 76 Page 129 Page 76 Page 215 Page 79 Page 127 Page 219 Page 76
Page 126 Page 76 Page 68

53263X 532750 532760 532770 532780 541950 541960 54196X 542040 542045 542050 550500 550570 550580 550590 550610 55061X 562110 562120 570810 570860 570925 570970 571030 571040 571060 571180 571210 571211 571212 571213 5B9000 5B9001 5B9002 5C9000 5C9001 5C9002 5D5017 5D5018 5D5019 5D5020 5D5022 5D5023 5D5024 5D5025 5D5026 5D5027 5D8001 5D8002 5D8003 5D8004 5D8006 5V7005 5V7016 5V7017

page 4
Page 58 Page 76 Page 77 Page 77 Page 77 Page 69 Page 125 Page 84 Page 69 Page 126 Page 126 Page 69 Page 77 Page 77 Page 77 Page 123 Page 127 Page 81 Page 82 Page 71 Page 77 Page 214 Page 220 Page 83 Page 71 Page 78 Page 125 Page 83 Page 78 Page 78 Page 85 Page 145 Page 145 Page 145 Page 146 Page 146 Page 146 Page 72 Page 72 Page 72 Page 72 Page 72 Page 72 Page 72 Page 73 Page 73 Page 73 Page 80 Page 80 Page 80 Page 80 Page 80 Page 73 Page 80 Page 73

;;.-
"/
'I
L';
5V7018 5V7019 5V7020 610550 610690 610730 l. 610740 610750 610755 610760 610870 610890 610900 610910 61091X 610925 610930 610990 611006 611020 611145 611160 61Y930 620399 620490 620590 620645 620647 620832 620834 620920 620940 620960 620975 621193 621194 62119X 621230 621255 621265 621390 621420 621440 621470 621475 621510 621530 621540 621545 621550 621560 621570 621640 621660 621670 62168X

Program Item Number Page Index for 1997 STIP by RDC

Page 80 Page 73 Page 81 Page 95 Page 188 Page 87 Page 1 Page 95 Page 95 Page 188 Page 95 Page 188 Page 188 Page 98 Page 61 Page 95 Page 95 Page 90 Page 95 Page 90 Page 1 Page 156 Page 96 Page 186 Page 184 Page 92 Page 101 Page 101 Page 86 Page 99 Page 1 Page 1 Page 188
Page 188 Page 103 Page 103 Page 87 Page 90 Page 86 Page 186 Page 1 Page 101 Page 86 Page 101 Page 101
Page 96 Page 87 Page 96 Page 96 Page 92 Page 92
Page 99 Page 187
Page 93 Page 93 Page 86

621830 621890 621910 621920 621950 621970 621980 622000 62R645 62R64 7 62Y230 62Y530 62Y834
630673 630915
630975 631100 631110 631140 631170 631250 631280 631290 631320
631402 631420 631430 631505 631510 631520 631525 631570
631580 631600 631630 632640 632650 632660 632680 632690 63Y673 641810 641880
641890 641950
641980 642030 642080 642085 642090 650410 650430 650440
650460 650480

Page 187 Page 93 Page 184 Page 93 Page 184 Page 61
Page 156
Page 93 Page 101 Page 101 Page 90 Page 87
Page 99 Page 2
Page 90 Page 2
Page 185 Page 185 Page 98 Page 98 Page 188 Page 102 Page 96 Page 61 Page 86 Page 87
Page 185 Page 87 Page 86 Page 87 Page 99 Page 96 Page 185 Page 88 Page 99 Page 2 Page 2
Page 99 Page 187 Page 96 Page 2
Page 103 Page 102
Page 61
Page 98 Page 99
Page 100 Page 61 Page 61
Page 61 Page 93 Page 88 Page 88 Page 93 Page 62

650570 650580 650600 65Y440 662500 662510 670710 670750 670780 670820 670900 670920
670930 670940
670942
670944 670950 671020 671040 671055 67105X 671070 671072 671074 6B9000 6B9001 6B9002 6C9000 6C9001 6C9002 6D6016 6D6017
6D6019 6D6021 6D6022 6D6023 6D6024 6D6025 6V7006 6V7014 6V7015
6V7016 6V7018
712360 712602 712630 712752
712806 712870
712930 712940 712950 713040 713050 713070

page 5
Page 62 Page 103 Page 94 Page 88 Page 62 Page 97 Page 88 Page 89 Page 186 Page 94 Page 102 Page 100 Page 184 Page 97 Page 97 Page 97 Page 2 Page 62 Page 62 Page 186 Page 189 Page 94 Page 102 Page 185 Page 146 Page 146 Page 146 Page 146 Page 147 Page 147 Page 91 Page 91 Page 91 Page 91 Page 91 Page 91 Page 91 Page 92 Page 1 Page 92 Page 92 Page 1 Page 92 Page 23 Page 3 Page 3 Page 6 Page 7 Page 13 Page 18 Page 24 Page 24 Page 13 Page 3 Page 3

713157 71315X 713210 713220 713240 713280 713310 713320 713330 713380 713400 71340X 713490 713650 713680
713750 71Y220 71Y320 71Y640 71Y940 71Y950 720570 721010 721040
72104X 721050 721150 721310 721320 721330 721420 721440 72144X 721460 721480 72148X 721535 72153X
721580 721680 721685 721810 721850 721930 72Y460 730756 730903 730905 730950 730970 731047 731048 731430 731520 731580 742482

Program Item Number Page Index for 1997 STIP by RDC

Page 24 Page 13 Page 4 Page 14 Page 7 Page 14 Page 24 Page 14 Page 24 Page 7 Page 24 Page 14 Page 19 Page 157 Page 14 Page 7
Page 14 Page 14 Page 42 Page 24 Page 25 Page 25 Page 25 Page 4 Page 20 Page 15 Page 7 Page 7 Page 19 Page 15 Page 19 Page 21 Page 4
Page 25 Page 4 Page 41 Page 15 Page 38 Page 42 Page 7 Page 8 Page 25 Page 25 Page 25 Page 26 Page 26 Page 42 Page 42 Page 42
Page 15 Page 43 Page 43 Page 26 Page 4 Page 26 Page 26

742820 742860 74286X 742880 750780 751370 751495 751560 751770 751775 751820 751825 751900 752020
752030 752040 752070 752075 752100 752190 752220 752230 752265
752300 752310 752320 752330 752390 752400 752420 752520 752540 752545 752550 752560 752570 752580 752590 752600 752620
752630 752650 752710 752770
762370 770265 770269 770274 770310
770350 770360
770388 770391 770398 770410

Page 43 Page 26 Page 38 Page 43 Page 26 Page 15
Page 15 Page 27 Page 4 Page 4 Page 19 Page 19
Page 27
Page 27
Page 27
Page 27
Page 27 Page 27 Page 15 Page 43 Page 8 Page 28 Page 8 Page 8 Page 8 Page 28 Page 43
Page 43 Page 44
Page 44
Page 28 Page 28 Page 28 Page 28 Page 28 Page 29 Page 29 Page 5 Page 5 Page 29
Page 8 Page 29
Page 29 Page 16
Page 29 Page 8 Page 9 Page 29 Page 30 Page 9 Page 9 Page 30 Page 157 Page 30 Page 30

770418 770420 770460 770585 770597 770605 770639 770690 770694 770730 770840 770860 770870
770873 770893
770900 770910 770911 770912 770913 770920 770921 770922 770923 770926 770927
770930 770931 770932 770933 770934 770935 770937 770951 770952 770960 770962
770963 770964 770965
770966 770967 770971 770972 770973
770975 770976 770977 770980 770985 770986
770988 770990 770992 770994

page 6
Page 9 Page 30 Page 5 Page 9 Page 30 Page 30 Page 31 Page 31 Page 9 Page 9 Page 16 Page 16 Page 31 Page 31 Page 10 Page 31 Page 16 Page 16 Page 16 Page 16 Page 10 Page 10 Page 10 Page 31 Page 31 Page 32 Page 10 Page 10 Page 32 Page 32 Page 44 Page 44 Page 44 Page 32 Page 32 Page 10 Page 11 Page 11 Page 11 Page 32 Page 11 Page 32 Page 33 Page 5 Page 11 Page 19 Page 19 Page 33 Page 33 Page 33 Page 33 Page 33 Page 17 Page 17 Page 44

~- ',
771010 771011 771012 771020 771021 771022 771030 771036 771037 771040 77Y990 7C9000 7C9001 7C9002 7D7507 7D7508 7D7509 7D7510 7D7511 7D7513 7D7514 7D7516 7D751X 7D7521 7D7522 7D7523 7D7525 7D7526 7D7528 7D7529 7D752X 7D7530 7D7532 7D7533 7D7543 7D7544 7D754Z 7V7008 7V7009 7V7010 7V7012 7V7015 7V7022 7V7023 7V7024

Program Item Number Page Index for 1997 STIP by RDC

Page 33 Page 34 Page 34 Page 11 Page 34 Page 11 Page 34 Page 34 Page 17 Page 12 Page 17 Page 147 Page 147 Page 147 Page 22 Page 22 Page 22 Page 22 Page 22 Page 6 Page 6 Page 18 Page 13 Page 22 Page 22 Page 23 Page 23 Page 23 Page 18 Page 18 Page 13 Page 18 Page 6 Page 6 Page 3 Page 23 Page 192 Page 3 Page 6 Page 13 Page 18 Page 23 Page 42 Page 3 Page 6

7V7025 7V7026 7V7027 7V7028 811020 811060 811061 811062 821050 870021 870022 870023
870150 870155 870160
870165 870170 8B9001 8B9002 8B9003 8C9000 8C9001 8C9002
8C9003 8C9100 8C9101 8D0001 8D0002 8V7001 8V7002
8V7003 8V7004 8V7005
8V7006 8V7007 8V7008 8V7009 NPSE97 NPSE98 NPSE99 NPSS97
NPSS98 NPSS99

Page 13 Page 18 Page 23 Page 42
Page 157 Page 157 Page 157 Page 157 Page 157 Page 158 Page 158 Page 158 Page 158 Page 158 Page 158 Page 158 Page 159 Page 147 Page 147 Page 148 Page 148 Page 148 Page 148 Page 148 Page 148 Page 148 Page 135 Page 135 Page 149 Page 149 Page 149 Page 149
Page 149 Page 149 Page 149 Page 150 Page 150 Page 159 Page 159 Page 159 Page 159 Page 159 Page 159

page 7