ATLANTA REGIONAL COMMISSION CENTRAL SAVANNAH RDC CHATTAHOOCHEE FLINT RDC COASTAL GEORGIA RDC COOSA VALLEY RDC GEORGIA MOUNTAINS RDC HEART OF GEORGIA - ALTAMAHA RDC LOWER CHATTAHOOCHEE RDC LUMP SUM AREA MCINTOSH TRAIL AREA RDC MIDDLE FLINT AREA RDC MIDDLE GEORGIA RDC NORTH GEORGIA RDC NORTHEAST GEORGIA RDC SOUTH GEORGIA RDC SOUTHEAST GEORGIA RDC SOUTHWEST GEORGIA RDC INDEX
PAGE
1 45 61 67 86 104 117 131 142 160 165 170 184 190 204 213 221
INTRODUCTION
The Georgia Department of Transportation's Statewide Transportation Improvement Program (STIP) is a three-year document that contains Federal Aid projects programmed for Fiscal years 1997, 1998 and 1999. These projects have been identified and developed through a cooperative planning process between the Department of Transportation, city and county governments and concerned citizens.
The STIP includes Highway and Bridge, Bicycle, Pedestrian, Transportation Enhancement and Public Transportation (transit) projects. Project cost for related activities, such as Preliminary Engineering (PE), Right ofWay (ROW) and Construction (CONST) are given for highways, and CAPITAL and OPERATING cost for public transit. The projects are organized in alphabetical order by Regional Development Center, County and mode of transportation.
Federal law requires a Transportation Improvement Program (TIP) for each metropolitan area exceeding 50,000 population. These TIP's are developed by Metropolitan Planning Organizations (MPO's) designated by the governor. The projects developed by the MPO's are included in the STIP.
The Intennodal Surface Transportation Efficiency Act of 1991 (ISTEA) specifies development of the STIP and that it be made available for public review and comment. Comments from citizens were solicited by public notice in the various legal organs throughout the state from May through August of this year, and at public information meetings held at each of the Regional Development Centers and each MPO.
The STIP is fiscally balanced, including only those projects with funding available or with a reasonable expectation of obtaining funds.
Projects in the Statewide Transportation Improvement Program emphasize maintenance, safety and improving operations of the existing highways, bridges and public transportation. The Georgia Department of Transportation is pleased to make this document available. We welcome comments on the STIP. Please send any questions or comments to:
Georgia Department of Transportation Office of Planning No. 2 Capitol Square Atlanta, Georgia 30334
Att: Carl Spinks (404) 657-6688 spinks_c@dot.state.ga.us
STIP FUNDS BY MODE
Fiscal Year 1997-98-99 ($ 2.471 Billion)
Public Trans. $519
(Including MARTA}
New Cst. $302
Maintenance $268 ridge $183
TEA $41
f-~~fotu $89
Dollars Shown in Millions
Recst/Rehab $1069
Georgia's Regional Development Centers
1. Coosa Valley 2. North Georgia 3. Georgia Mountains 4. Atlanta Region 5. Chattahoochee-Flint 6. Mcintosh Trail 7. Northeast Georgia 8. Middle Georgia 9. Central Savannah
River Area 10. Lower Chattahoochee 11. Middle Flint 12. Heart of Georgia -
Altamaha 13. Coastal Georgia 14. Southwest Georgia 15. South Georgia 16. Southeast Georgia
L .
ATLANTA REGIONAL COMMISSION
Cherokee Clayton
Cobb Dekalb Douglas Fayette Fulton Gwinnett Henry Rockdale
70
Ric!c_ ________ _
llLLLQJi_
c_c.c<~~~~f~;:~~]
10
II
0
M
10
t..__::_ __ :'J-0
1.,- c-;_
\._(_
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 1
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
ATLANTA TIP # CH AR 152B
6V7006 TRANSIT PROJECTS / CAPITAL
CONG DIST. 9 & 6
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY
CAPITAL 1997
$
30
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
24
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6V7016 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY MANAGER: STEVE KISH STATUS:
ATLANTA TIP # CH AR 152C
CONG DIST. 6 & 9
CAPITAL 1998
$
31
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
CHEROKEE I-75 @ SR 92 610740 INTERCHANGE / RECST. OR REHAB.
LENGTH(Miles/km): .45/.72405- EXIST. LANES: 4 /PROPOSED LANES: MANAGER: RAY METTS STATUS: CHEROKEE SGN A 2/96;COBB SGN DO U 5/96;BARTOW REF A 4/96.
ATLANTA TIP # CH AR 108 CONG DIST. 6 6 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1997 $ 2580
CONST 1998
$ 2892
FED SHARE $ 2314
GA. SHARE $ 578
OTH SHARE $
CHEROKEE I-575 @ CR 416 & GUARDRAIL POSTS
ATLANTA TIP # CH AR 223
611145 TURN LANES / SAFETY
CONG DIST. 6
LENGTH(Miles/km): 12.35/19.87115 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: GREG PARKER
FUND SOURCE: I-STATE MAINT.
STATUS: COUNTY SGN FOR ROW & UTILITIES 1-31-95
OTO
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY ROW LOCL CONST 1997 $ 1142
FED SHARE $ 1142 GA. SHARE $ OTH SHARE $
CHEROKEE SR 92 FM WADE GREEN ROAD TO CHEROKEE TRAIL 620920 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.62/4.21558 MANAGER: RAY METTS STATUS: CHEROKEE COUNTY SGN FOR UTILITIES 11-4-91.
ATLANTA TIP # CH 003 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW 1998 CONST
UNDERWAY $ 7631 AFTER 99
CHEROKEE SR 92 FM I-75 TO WADE GREEN ROAD 620940 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 5.40/8.68860 MANAGER: RAY METTS STATUS: CHEROKEE COUNTY SIGNED FOR UTILITIES 11-4-91.
ATLANTA TIP # CH 004 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1995
ROW 1998 CONST
UNDERWAY $ 6450 AFTER 99
CHEROKEE SR 92 FM CHEROKEE TRAIL TO CANTON HWY/SR 754 621390 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): 1.80/2.89620 MANAGER: KEVIN HOSEY STATUS: CO SGN 1/90 PUB UTL/WOODSTOCK SGN 12/90 UTIL. SEE #620920
ATLANTA TIP # CH 009 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1992 UNDERWAY
ROW 1997 $ 6694 CONST 1998 $ 7481
FED SHARE $ 5985 GA. SHARE $ 1496 OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 2
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------P-R-O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-OM--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHEROKEE CANTON HWY FM PALM RD/CR 351 TO N/SIXES RD [INCL RR BR]
ATLANTA TIP # CH 002A
PE 1994 UNDERWAY
630673 REPLACEMENT OF THE EXISTING BRIDGES{S). FROM 2 TO 3 LANES.
CONG DIST. 6
ROW LOCL
LENGTH{Miles/km): .28/.45052
CONST 1997
$
800
MANAGER: GREG PARKER
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 640
STATUS: CHEROKEE COUNTY SIGNED 9-23-91 FOR ROW AND UTILITIES.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
160
63Y673 IS AN ASSOCIATED PROJECT.
OTH SHARE $
CHEROKEE CR 770/BELLS FERRY FM 700 FT S. OF LITTLE RIVER BRD N. . 2 MI 630975 REHABILITATION OF THE EXISTING BRIDGE{S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: B. FERGUSON STATUS: CHEROKEE COUNTY SIGNED 9-23-91 FOR ROW & UTIL. {SEE 630977)
ATLANTA TIP # CH 018 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1997
$
913
FED SHARE $ 730
GA. SHARE $
183
OTH SHARE $
CHEROKEE SR 20 AT HOLBROOK CAMPGROUND ROAD/CR 763
632640 TURN LANES / SAFETY LENGTH{Miles/km): .42/.67578- EXIST. LANES:
MANAGER: GREG PARKER STATUS: COUNTY SIGNED FOR ROW AND UTILITIES 3-19-96
0 /PROPOSED LANES: OTO
ATLANTA TIP # AR 157C
CONG DIST. 9 0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
257
FED SHARE $ 231
GA. SHARE $
26
OTH SHARE $
CHEROKEE SR 20 AT EAST CHEROKEE DRIVE/CR 765/CR 782 632650 TURN LANES / SAFETY
LENGTH(Miles/km): .42/.67578- EXIST. LANES: MANAGER: GREG PARKER STATUS: COUNTY SIGNED FOR ROW AND UTILITIES 3-19-96
0 /PROPOSED LANES: OTO
ATLANTA TIP # AR 157C CONG DIST. 9 0 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
255
FED SHARE $ 230
GA. SHARE $
26
OTH SHARE $
CHEROKEE CANTON HWY FM PALM RD TO SIXES RD - FOR STP; SEE 630673 63Y673 BRIDGES / REPLACEMENT
LENGTH{Miles/km): .00/.00000 MANAGER: GREG PARKER
STATUS: SEE 630673
ATLANTA TIP # CH 002B CONG DIST. 9
PE NONE $
0
ROW LOCL
CONST 1997 $ 351
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 281
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
70
630673 IS AN ASSOCIATED PROJECT.
OTH SHARE $
CHEROKEE CR 362/MILL CREEK ROAD @ MILL CREEK 2 MI NE OF WOODSTOCK 670950 REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES.
LENGTH{Miles/km): .20/.32180 MANAGER: GREG PARKER STATUS: REQ CHEROKEE COUNTY DO ROW, UTILITIES & DETOURS 9-27-94
ATLANTA TIP # CH 028 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW LOCL
CONST 19.98
$
838
FED SHARE $ 670
GA. SHARE $ 168
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 3
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLAYTON CAPITAL - PARK & RIDE LOTS - SR 85 AT POINTE SOUTH PARKWAY,
ATLANTA TIP # CL AR 220D
7D7543 TRANSIT PROJECTS / CAPITAL
CONG DIST. 3
FUNDS RECIPIENT: CLAYTON COUNTY MANAGER: STEVE KISH STATUS: US 41/19 AT LOVEJOY RD, SR 314 AT SR 138, FEASIBILITY STUDY
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$
FED SHARE $
GA. SHARE $
1353 1082
135
OTH SHARE $
135
CLAYTON 7V7008
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
ATLANTA TIP # CL AR 223B
CONG DIST. 3
CAPITAL 1997
$
30
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
CLAYTON 7V7023
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
ATLANTA TIP # CL AR 223C
CONG DIST. 3
CAPITAL 1998
$
31
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
CLAYTON 712602
STATUS:
LEE STREET IN MORROW OVER I-75 BRIDGES / NEW CONSTRUCTION LENGTH(Miles/km): .08/.12872
MANAGER: M. REYNOLDS COUNTY SGN DO ROW, UTIL, CONST ROADWAY & APPROACHES 2-15-94
ATLANTA TIP # CL 059 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 712630 IS AN ASSOCIATED PROJECT.
PE 1992
UNDERWAY
ROW LOCL
CONST 1998 $ 1079
FED SHARE $
863
GA. SHARE $
216
OTH SHARE $
CLAYTON 712630
STATUS:
I-75 FM MT ZION RD TO OLD DIXIE(BRIDGES)& SR 54 INTERCHANGE
ATLANTA TIP # CL AR 031
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 3
LENGTH(Miles/km): 2.40/3.86160 - EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: M. REYNOLDS
FUND SOURCE: NAT'L HIGHWAY
DOT TO PAY 9-2-92
FEDERAL HIGHWAY ADMIN FUNDS
751295 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1997
$
920
CONST 1998 $ 15139
FED SHARE $ 12111
GA. SHARE $ 3028
OTH SHARE $
CLAYTON 713050
STATUS:
I-675, I-75, I-20: IMPACT ATTENUATORS IMPACT ATTENTUATORS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST.
MANAGER: KARL ALFF NOT APPLICABLE
& BARRIER WALL AT BR LANES: 0 /PROPOSED LANES:
ATLANTA TIP # AR 222 CONG DIST. 3 & 5 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1997 $ 1000
FED SHARE $ 1000
GA. SHARE $
OTH SHARE $
CLAYTON 713070
STATUS:
I-75, I-85, I-20, I-285 & I-675 @ VARIOUS LOC IN METRO ATL
ATLANTA TIP # AR 187
GUARDRAIL / MAINTENANCE
CONG DIST. 5
LENGTH(Miles/km): 34.00/54.70600- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE
$
0
ROW NONE
$
0
CONST 1997
$
523
FED SHARE $ 523
GA. SHARE $
OTH SHARE $
COUNTY P. I . NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CLAYTON 713210
STATUS:
I-285 EAST TO I-75 SOUTH RAMP ALIGNMENT
ATLANTA TIP # CL AR 179
RAMP / RECST. OR REHAB.
CONG DIST. 3
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. SMITH
FUND SOURCE: I-STATE MAINT.
REQ CLAYTON COUNTY DO UTILITIES 10-31-95
FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 721040
STATUS:
SR 54 (& FAYETTE CO) @ MORNING & CAMP CRKS; & FLINT RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): 1.20/1.93080 MANAGER: D. GODWIN CLAYTON SGN 6/85 FOR UTILITIES;FAYETTE SGN 5/95 UTILITIES
ATLANTA TIP # CL 023 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72104X IS AN ASSOCIATED PROJECT.
CLAYTON 72144X
STATUS:
SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 ... SEE FAYETTE CO.
ATLANTA TIP# CL 041
UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M. REYNOLDS
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
721440 IS AN ASSOCIATED PROJECT.
CLAYTON 721480
STATUS:
SR 138 FM WALT STEPHENS RD EAST TO I-75/HENRY CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.55/5.71195
MANAGER: J. GARLAND REQ CLAYTON & HENRY COUNTIES DO UTILITIES 6-7-90.
ATLANTA TIP # CL 031 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 72148X IS AN ASSOCIATED PROJECT.
CLAYTON 731520
STATUS:
SR 3/US 19 @ CEN OF GA RAILROAD .35 MI S OF JCT I-285 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .26/.41834 MANAGER: D. GODWIN REQ CO DO UTIL 2-9-96 1 REQ FOREST PARK DO UTIL 2-9-96.
ATLANTA TIP # CL 095 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 4
FISCAL YEAR
COST ESTS
PE 1995 UNDERWAY
ROW 1997
$
50
CONST 19-98
$
388
FED SHARE $ 349
GA. SHARE $
39
OTH SHARE $
PE 1986 UNDERWAY ROW 1994 UNDERWAY CONST 1997 $ 4555
FED SHARE $ 3644
GA. SHARE $ 911
OTH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE 1992 ROW 1997 CONST
UNDERWAY
$ 4970 AFTER 99
PE 1997 ROW 1998 CONST
UNDERWAY $ 110 AFTER 99
CLAYTON "751770
STATUS:
BATTLECREEK-MT.ZION FM SOUTHLAKE PKWY TO LAKE HARBIN RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.63/4.23167 MANAGER: J. GRAYBEAL CLAYTON COUNTY SIGNED 3-5-91 FOR ROW AND UTILITIES.
ATLANTA TIP # CL 019 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
10
AFTER 99
CLAYTON 751775
STATUS:
BATTLE CREEK RD FM VALLEY HILL RD TO SOUTHLAKE PKWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.98/3.18582 MANAGER: D. GODWIN CLAYTON COUNTY SIGNED 6-4-91 FOR ROW & UTILITIES
ATLANTA TIP # CL 017A CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
10
AFTER 99
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
t:._._
.,_)
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 5
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLAYTON BETHSAIDA RD EXT FM SR 85 TO CHURCH ST & CTR TN LN ON CHURCH
ATLANTA TIP # CL 052A
PE 1997 UNDERWAY
752590 RECONSTRUCTION & WIDENING FROM 3 LANES TO 5 LANES.
CONG DIST. 5
ROW LOCL
LENGTH(Miles/km): 1.07/1.72163
CONST 1998
$ 1438
MANAGER: D. SMITH STATUS: COUNTY SGN CT FOR PE, ROW & UTILITIES 8-25-95
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 1150 GA. SHARE $ 288
OTH SHARE $
CLAYTON 752600
STATUS:
BETHSAIDA RD EXT FM ROBERTS DR TO UPPER R'DALE RD ON N LOC CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 1.15/1.85035 MANAGER: D. SMITH CT REQ COUNTY DO PE, ROW & UTILITIES 4-12-95
ATLANTA TIP # CL 052C CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 770460
STATUS:
JESTERS CK GREENWAY FM JONESBORO TO MORROW
ATLANTA TIP # CL 089
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 3
LENGTH(Miles/km): 4.00/6.43600 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CRANFORD
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
$
ROW LOCL
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
25 2679
2679
PE 1995 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$ 1364
FED SHARE $ 1017
GA. SHARE $
OTH SHARE $ 347
CLAYTON 770972
STATUS:
BICYCLE RACKS FOR CLAYTON COUNTY
ATLANTA TIP # CL AR 177A
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 3 & 5
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997 $
13
FED SHARE $
10
GA. SHARE $
OTH SHARE $
3
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 6
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
TRANSIT OPERATING ASSISTANCE FOR FY 1997
ATLANTA TIP # CO AR 221B
707513 TRANSIT PROJECTS / OPERATIONS
CONG DIST. 6 & 7
FUNDS RECIPIENT: COBB COMMUNITY TRANSIT
OPERATING 1997
$ 4239
~AGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
FED SHARE $ 270
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $ 3969
COBB 707514
STATUS:
CAPITAL/PLANNING - MULTI-USE TRANSIT FACILITY, VEHICLE TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH WHEELCHAIR LIFTS REPLACEMENT - 12, FACILITY IMPROVEMENTS.
ATLANTA TIP # CO AR 222B CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
2596 2077
260 260
COBB 707532
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1998 TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: MANAGER: STEVE KISH
ATLANTA TIP # CO AR 221C CONG DIST. 7 & 6
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
4186 244
3942
COBB 707533
STATUS:
CAPITAL/PLANNING - MULTI-USE TRANSIT FACILITY, VEHICLE TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
ATLANTA TIP # CO AR 222C CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
2596 2077
260
260
COBB 7V7009
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY
MANAGER: STEVE KISH
ATLANTA TIP # CO AR 231B
CONG DIST. 7 & 6
CAPITAL 1997
$
75
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
60
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
OTH SHARE $
8
COBB 7V7024
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH
ATLANTA TIP # CO AR 231C
CONG DIST. 7 & 6
CAPITAL 1998
$
78
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
62
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
OTH SHARE $
8
COBB 712752
STATUS:
WINDY RIDGE PARKWAY FM COBB PKWY TO THE I-75 BRIDGE; PHASE 2 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
LENGTH(Miles/km): .70/1.12630 MANAGER: G. ROSS COBB SGN 3-26-93 UTIL/PE/ROW EXECPT FROM US 41 TO CIRCLE 75
ATLANTA TIP # CO 171B CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 770931 IS AN ASSOCIATED PROJECT.
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$ 1844
FED SHARE $ 1475
GA.- SHARE $ 369
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 7
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
KENNEDY INTERCHANGE I-75NB TO I-285WB FLYOVER BRIDGE (CT 5)
ATLANTA TIP # CO AR 078M
PE 1998 $
5
712806 INTERCHANGE / NEW CONSTRUCTION
CONG DIST. 6
ROW LOCL
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 2
CONST
AFTER 99
MANAGER: G. ROSS
FUND SOURCE: I-STATE MAINT.
STATUS: COBB SGN DO ROW, UTIL & PE 3-26-93.
FEDERAL HIGHWAY ADMIN FUNDS
COBB 713240
STATUS:
I-285 @ WEST PACES FERRY RD - INTERCHANGE RECST INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .50/.80450 -EXIST. LANES: 4 /PROPOSED
MANAGER: G. ROSS COBB SGN CONTRACT FOR PE & UTILITIES 9-28-95
LANES:
ATLANTA TIP # CO AR 180 CONG DIST. 6 6 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW 1998 CONST
UNDERWAY $ 2764 AFTER 99
COBB 713380
STATUS:
ATMS: I-75/COMMUNICA/SURVEILLANCE FM I-285 TO ALLGOOD ROAD
ATLANTA TIP # AR 217A
MISCELLANEOUS IMPROVEMENTS / SAFETY
CONG DIST. 6
LENGTH(Miles/km): 7.18/11.55262 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
COBB 713750
STATUS:
I-575 CONSTRUCT BARRIER WALL
WALLS / SAFETY LENGTH(Miles/km): .20/.32180 MANAGER: KEVIN HOSEY NOT APPLICABLE
IN SOUTHBOUND GORE AREA OF I-75 - EXIST. LANES: 2 /PROPOSED LANES:
ATLANTA TIP # AR 187 CONG DIST. 6 2 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
COBB 721150
STATUS:
SR 3/US 41/COBB PKWY FM AKERS MILL RD TO WINDY RIDGE PKWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
LENGTH(Miles/km): .70/1.12630
MANAGER: G. ROSS COBB SGN CT 3-12-93--UTILITIES, PE & $100,000 CONSTRUCTION.
ATLANTA TIP # CO 080 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COBB 721310
STATUS:
SR 120/ROSWELL RD FM SR 120LP TO PIEDMONT RD/MARIETTA/72Y310 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 1.43/2.30087
MANAGER: D. SMITH COBB REFUSED 5-23-91 UNTIL MORE SPECIFIC DESIGN IS COMPLETED
COBB 721680
STATUS:
SR 176/MARS HILL RD FRM SR 120/DALLAS HWY TO STILESBORO RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.35/6.99915 MANAGER: D. SMITH COBB SGN CONTRACT 1-5-95 FOR PE & UTILITIES
ATLANTA TIP # CO 177 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72Y310 IS AN ASSOCIATED PROJECT.
ATLANTA TIP # CO 124A CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $ GA. SHARE $ OTH SHARE $
0
0 2600 2080
520
PE 1997
UNDERWAY
ROW NONE
$
0
CONST 1998 $
70
FED SHARE $
70
GA. SHARE $
OTH SHARE $
PE 1992 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$ 5600
FED SHARE $ 4480
GA. SHARE $ 1020
OTH SHARE $ 100
PE 1997
ROW 1998 CONST
$
80
$ 1995
AFTER 99
PE 1992 UNDERWAY
ROW 1997
$ 6685
CONST 1998 $ 6101
FED SHARE $ 4881
GA. SHARE $ 1220
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 8
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
MARS HILL RD FM STILESBORO RD TO SR 3/COBB PARKWAY
721685 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
ATLANTA TIP # CO 124B CONG DIST. 6
PE NONE ROW 19.97
$
0
$ 4880
LENGTH(Mi1es/km): 3.13/5.03617 MANAGER: D. SMITH
FUND SOURCE: NAT'L HIGHWAY
CONST 1998 $ 5604 FED SHARE $ 4483
STATUS: COBB SGN CONTRACT 1-5-95 FOR PE & UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1121
OTH SHARE $
COBB 752220
STATUS:
SR 6 BUS OVER POWDER SPRINGS CRK W. OF POWDER SPRINGS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN REQ COUNTY DO UTILITIES 9-26-95
ATLANTA TIP # CO 247 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY
ROW 1997 $
20
CONST 1998 $ 749
FED SHARE $
599
GA. SHARE $ 150
OTH SHARE $
COBB 752265
STATUS:
SR 6 BUS REALIGNMENT WITH POWDER SPRINGS ROAD
INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .20/.32180- EXIST. LANES: 2
MANAGER: D. GODWIN POWDER SPRINGS SGN ROW & UTILITIES 9-8-92; SEE
/PROPOSED LANES: 752260 OTO
ATLANTA TIP # CO 248B CONG DIST. 7 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW LOCL
CONST 1997
$
456
FED SHARE $ 410
GA. SHARE $
46
OTH SHARE $
COBB 752300
STATUS:
EAST-WEST CONN FM S COBB DR TO ATLANTA RD; PHASE 1 CONSTRUCTION OF NEW ROUTE WITH 6 LANES PROPOSED. LENGTH(Miles/km): .00/.00000
MANAGER: G. ROSS COBB SGN DO ROW, UTILITIES & 100% PE 3-26-93
ATLANTA TIP # CO AR 070A CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
5
AFTER 99
COBB 752310
STATUS:
OLD CANTON RD OVER SHEFFER CK TRIBUTARY/SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360
MANAGER: D. GODWIN COBB SGN CONTRACT FOR PE, ROW & UTILITIES 10-24-94
COBB 752630
STATUS:
CR 4455/CANTON ROAD & RR BR OVER SR 3/US 41 N OF MARIETTA
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN CT REQ CO DO PE/ROW/UTIL 8/95;MARIETTA SGN PUB UTIL 9/95
ATLANTA TIP # CO 246 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP # CO 272 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1997
$
741
FED SHARE $ 593
GA. SHARE $ 148
OTH SHARE $
PE 1998
ROW LOCL CONST
$
5
AFTER 99
COBB 770265
STATUS:
CR 4431/NEW SALEM RD SOUTH OF KENNESAW @ NOONDAY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN COBB SIGNED CONTRACT TO DO PE, RW, UTIL 12/11/95
ATLANTA TIP # CO 270 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1997
ROW LOCL CONST
$
5
AFTER 99
_...._ ...
'.:':
r;-__
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 9
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
CR 2121/HOLLOMAN RD WEST OF AUSTELL @ SWEETWATER CRK TRIB
770269 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
ATLANTA TIP # CO 268 CONG DIST. 7
PE 1997 $
5
ROW LOCL
LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN
FUND SOURCE: BRIDGE PROGRAM
CONST
AFTER 99
STATUS: CT SGN DO PE, ROW, UTIL 12/11/95.
FEDERAL HIGHWAY ADMIN FUNDS
COBB 770350
STATUS:
OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN CONTRACT SIGNED FOR PE, ROW & UTILITIES 3-17-95
ATLANTA TIP # CO 239 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
392
FED SHARE $ 314
GA. SHARE $
78
OTH SHARE $
COBB 770360
STATUS:
HIRAM RD/CR 2081 OVER POWDER SPRINGS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN CT SGN PE, ROW & UTIL 3-22-95; CO TO PAY 21K FOR ADDL WIDTH
ATLANTA TIP # CO 245 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1997
$
307
FED SHARE $ 246
GA. SHARE $
40
OTH SHARE $
21
COBB 770418
STATUS:
ATMS: INSTALL COMMUNICATION LINKS BETWEEN TMC AND COUNTY TCC
ATLANTA TIP # R 098B
MISCELLANEOUS IMPROVEMENTS / SAFETY
CONG DIST. 7 & 6
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: DEMONSTRATION PROGRAM
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
850
FED SHARE $ 680
GA. SHARE $ 170
OTH SHARE $
COBB 770585
STATUS:
CR 943/0LD VILLA RICA RD. @ WILD HORSE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN CT REQ COBB DO PE, RW, UTIL 8/28/95
ATLANTA TIP # CO 269 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW LOCL CONST
$
5
AFTER 99
COBB 770694
STATUS:
ATMS: NON-FREEWAY SURVEILLANCE SYSTEM IN COBB COUNTY MISCELLANEOUS IMPROVEMENTS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST, LANES: 0 /PROPOSED LANES:
MANAGER: KARL ALFF LGPA NOT APPLICABLE
ATLANTA TIP # AR 190E CONG DIST. 6 & 7 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
COBB 770730
STATUS:
CONCORD COVERED BR/CONCORD RD OVER NICKAJACK CREEK
BRIDGES / ENHANCEMENT LENGTH(Miles/km): ,00/.00000 MANAGER: G. ROSS DOT WILL PROVIDE THE 20% MATCH
ATLANTA TIP # CO 251 CONG DIST. 6
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE $
0
ROW NONE $
0
CONST 1997
$
385
FED SHARE $ 308
GA. SHARE $
77
OTH SHARE $
PE NONE $
0
ROW NONE $
0
CONST 1997 $
35
FED SHARE $
28
GA. SHARE $
7
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 10
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
ATMS: NON-FREEWAY COMMUNICATION FIBER OPTIC CABLE IN COBB CO
770893 MISCELLANEOUS IMPROVEMENTS / SAFETY
ATLANTA TIP # AR 224 CONG DIST. 6 & 7
PE NONE $
0
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1997 $ 530
MANAGER: KARL ALFF
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE $
424
STATUS: COBB SGN 12-11-95 TO MAINTAIN COMMUNICATION LINES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 106
OTH SHARE $
COBB 770920
STATUS:
SPRING ROAD FROM VILLAGE PKWY TO CAMPBELL ROAD
ATLANTA TIP # CO AR 177F
BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): .70/1.12630- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
91
FED SHARE $
73
GA. SHARE $
OTH SHARE $
18
COBB 770921
STATUS:
WINDY HILL RD FM COBB PKWY TO ATLANTA ROAD
ATLANTA TIP # CO AR 177A
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 6 & 7
LENGTH(Miles/km): 4.20/6.75780- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
650
FED SHARE $ 520
GA. SHARE $
OTH SHARE $ 130
COBB 770922
STATUS:
VILLAGE PKWY FM SPRING RD TO WINDY HILL ROAD
ATLANTA TIP # CO AR 177B
BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 1.20/1.93080 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
165
FED SHARE $
132
GA. SHARE $
OTH SHARE $
33
COBB 770930
STATUS:
COBB PKWY FM LAKE PARK DR TO SPRING RD
ATLANTA TIP # CO AR 177G
SIDEWALKS / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1998
$
272
FED SHARE $ 218
GA. SHARE $
OTH SHARE $
54
COBB 770931
STATUS:
AUSTELL ROAD & CIRCLE 75 PARKWAY
ATLANTA TIP # CO AR 177CD
SIDEWALKS / ENHANCEMENT
CONG DI ST . 7 & 6
LENGTH(Miles/km): 6.00/9.65400 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
CT REQ COUNTY DOPE, UTIL, ROW & 20% CONSTRUCTION 9-4-96.
FEDERAL HIGHWAY ADMIN FUNDS
712752 IS AN ASSOCIATED PROJECT.
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
765
FED SHARE $
612
GA. SHARE $
OTH SHARE $
153
COBB 770960
STATUS:
SIDEWALKS FOR TRANSIT @ TOWN CENTER AREA
ATLANTA TIP # CO AR 165E
SIDEWALKS / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
429
FED SHARE $ 343
GA. SHARE $
OTH SHARE $
86
,......;.._-\._'.'
~--'
~'"":.?11
''~ ;,:._
\1'-:.:""- -~
~: -
\i-
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 9
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
* -P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
CR 2121/HOLLOMAN RD WEST OF AUSTELL @ SWEETWATER CRK TRIB
ATLANTA TIP CO 268
PE 1997 $
5
770269 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 7
ROW LOCL
LENGTH(Mi1es/km): .20/.32180
CONST
AFTER 99
MANAGER: D. GODWIN
FUND SOURCE: BRIDGE PROGRAM
STATUS: CT SGN DO PE, ROW, UTIL 12/11/95.
FEDERAL HIGHWAY ADMIN FUNDS
COBB 770350
STATUS:
OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN CONTRACT SIGNED FOR PE, ROW & UTILITIES 3-17-95
* ATLANTA TIP CO 239
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
392
FED SHARE $ 314
GA. SHARE $
78
OTH SHARE $
COBB 770360
STATUS:
HIRAM RD/CR 2081 OVER POWDER SPRINGS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN CT SGN PE, ROW & UTIL 3-22-95; CO TO PAY 21K FOR ADDL WIDTH
ATLANTA TIP # CO 245 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1997
$
307
FED SHARE $ 246
GA. SHARE $
40
OTH SHARE $
21
COBB 770418
STATUS:
ATMS: INSTALL COMMUNICATION LINKS BETWEEN TMC AND COUNTY TCC MISCELLANEOUS IMPROVEMENTS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: KARL ALFF LGPA NOT APPLICABLE
ATLANTA TIP # R 098B CONG DIST. 7 & 6 0
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
850
FED SHARE $ 680
GA. SHARE $ 170
OTH SHARE $
COBB 770585
STATUS:
CR 943/0LD VILLA RICA RD. @ WILD HORSE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180
MANAGER: D. GODWIN CT REQ COBB DO PE, RW, UTIL 8/28/95
ATLANTA TIP # CO 269 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW LOCL CONST
$
5
AFTER 99
COBB 770694
STATUS:
ATMS: NON-FREEWAY SURVEILLANCE SYSTEM IN COBB COUNTY MISCELLANEOUS IMPROVEMENTS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: KARL ALFF LGPA NOT APPLICABLE
LANES:
ATLANTA TIP # AR 190E CONG DIST. 6 & 7 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
COBB 770730
STATUS:
CONCORD COVERED BR/CONCORD RD OVER NICKAJACK CREEK
BRIDGES / ENHANCEMENT LENGTH(Miles/km): .00/.00000 MANAGER: G. ROSS DOT WILL PROVIDE THE 20% MATCH
ATLANTA TIP # CO 251 CONG DIST. 6
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE $
0
ROW NONE
$
0
CONST 1997
$
385
FED SHARE $
308
GA. SHARE $
77
OTH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST 1997
$
35
FED SHARE $
28
GA. SHARE $
7
OTH SHARE $
COUNTY P. I. NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
20-Sep-1996 Page 10
FISCAL YEAR
COST ESTS
COBB
ATMS: NON-FREEWAY COMMUNICATION FIBER OPTIC CABLE IN COBB CO
ATLANTA TIP # AR 224
PE NONE $
0
770893 MISCELLANEOUS IMPROVEMENTS / SAFETY
CONG DIST. 6 & 7
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1997 $ 530
MANAGER: KARL ALFF
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE $
424
STATUS: COBB SGN 12-11-95 TO MAINTAIN COMMUNICATION LINES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 106
OTH SHARE $
COBB 770920
STATUS:
SPRING ROAD FROM VILLAGE PKWY TO CAMPBELL ROAD BICYCLE/FED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .70/1.12630 -EXIST. LANES: 0 MANAGER: D. GODWIN TO BE DONE BY CONTRACT
/PROPOSED LANES:
ATLANTA TIP # CO AR 177F CONG DIST. 6
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
91
FED SHARE $
73
GA. SHARE $
OTH SHARE $
18
COBB 770921
STATUS:
WINDY HILL RD FM COBB PKWY TO ATLANTA ROAD
ATLANTA TIP # CO AR 177A
BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 6 & 7
LENGTH(Miles/km): 4.20/6.75780 -EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
650
FED SHARE $
520
GA. SHARE $
OTH SHARE $ 130
COBB 770922
STATUS:
VILLAGE PKWY FM SPRING RD TO WINDY HILL ROAD
ATLANTA TIP # CO AR 177B
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 1.20/1.93080 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
165
FED SHARE $ 132
GA. SHARE $
OTH SHARE $
33
COBB 770930
STATUS:
COBB PKWY FM LAKE PARK DR TO SPRING RD
ATLANTA TIP # CO AR 177G
SIDEWALKS / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1998 $ 272
FED SHARE $ 218
GA. SHARE $
OTH SHARE $
54
COBB 770931
STATUS:
AUSTELL ROAD & CIRCLE 75 PARKWAY
ATLANTA TIP # CO AR 177CD
SIDEWALKS / ENHANCEMENT
CONG DIST. 7 & 6
LENGTH(Miles/km): 6.00/9.65400 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
CT REQ COUNTY DOPE, UTIL, ROW & 20% CONSTRUCTION 9-4-96.
FEDERAL HIGHWAY ADMIN FUNDS
712752 IS AN ASSOCIATED PROJECT.
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
765
FED SHARE $ 612
GA. SHARE $
OTH SHARE $ 153
COBB 770960
STATUS:
SIDEWALKS FOR TRANSIT @ TOWN CENTER AREA
ATLANTA TIP # CO AR 165E
SIDEWALKS / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
429
FED SHARE $ 343
GA. SHARE $
OTH SHARE $
86
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 11
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L--D--EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
SIDEWALKS FOR TRANSIT @ CUMBERLAND-GALLERIA AREA
ATLANTA TIP # CO AR 165A
PE 1996 UNDERWAY
770962 SIDEWALKS / ENHANCEMENT
CONG DIST. 6
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1997
$
174
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE $ 139
STATUS: CT REQ COUNTY DO PE, UTIL, ROW & 20% CONSTRUCTION 9-4-96.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
OTH SHARE $
35
COBB 770963
STATUS:
SIDEWALKS FOR TRANSIT @ WILDWOOD-INTERSTATE NORTH AREA SIDEWALKS / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: D. GODWIN CT REQ COUNTY DO PE, UTIL, ROW & 20% CONSTRUCTION 9-4-96.
ATLANTA TIP # CO AR 165B CONG DIST. 6 0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
444
FED SHARE $ 355
GA. SHARE $
OTH SHARE $
89
COBB 770964
STATUS:
SIDEWALKS FOR TRANSIT @ SOUTH COBB DRIVE AREA SIDEWALKS / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: D. GODWIN TO BE DONE BY CONTRACT
/PROPOSED LANES:
ATLANTA TIP # CO AR 165C CONG DIST. 6
0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997 $ 374
FED SHARE $ 299
GA. SHARE $
OTH SHARE $
75
COBB 770966
STATUS:
SIDEWALKS FOR TRANSIT @ SR 120, FRANKLIN RD & DELK RD SIDEWALKS / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: D. GODWIN TO BE DONE BY CONTRACT
LANES:
ATLANTA TIP # CO AR 165D CONG DIST. 6 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
516
FED SHARE $ 413
GA. SHARE $
OTH SHARE $
103
COBB 770973
STATUS:
BICYCLE/PEDESTRIAN FOR BIKE AWARENESS SIGNAGE & PARKING FAC'
ATLANTA TIP # CO AR 177E
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 6 & 7
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
30
FED SHARE $
24
GA. SHARE $
OTH SHARE $
6
COBB 771020
STATUS:
COBB/SMYRNA FM CAMP HIGHLAND RD TO PAULDING CO (OLD CSX RR)
ATLANTA TIP # CO 273
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 8.90/14.32010 -EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1998 $ 500
FED SHARE $ 400
GA. SHARE $
OTH SHARE $
100
COBB 771022
STATUS:
MARIETTA MULTI USE TRAIL
ATLANTA TIP # CO 274
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 7
LENGTH(Miles/km): 1.30/2.09170 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW LOCL
CONST 1998
$
500
FED SHARE $ 400
GA. SHARE $
OTH SHARE $
100
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 12
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
CR 944/0LD DALLAS ROAD @NOSES CREEK 4.1 MI W OF MARIETTA
ATLANTA TIP # CO 271
PE 1997 $
10
771040 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 6
ROW LOCL
LENGTH(Miles/km): .20/.32180
CONST
AFTER 99
MANAGER: D. GODWIN
FUND SOURCE: BRIDGE PROGRAM
STATUS: CONTRACT REQUEST COUNTY DO PE, UTIL & ROW 7-29-96.
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
20-Sep-1996 Page 13
FISCAL YEAR
COST ESTS
DEKALB 7D751X
STATUS:
TRANSIT OPERATIONS PROGRAM; SEE FULTON 707510
TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 208B
CONG DIST. 0 & 0
OPERATING NONE
$
0
FUND SOURCE: URBAN TRANSIT
FEDERAL TRANSIT ADMIN FUNDS
707510 IS AN ASSOCIATED PROJECT.
DEKALB 7D752X
STATUS:
BUS RELATED PROCUREMENT - 50 BUSES SEE FULTON 707522 TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 302B
CONG DIST. 0 & 0
CAPITAL NONE
$
0
FUND SOURCE: URBAN TRANSIT DISC.
FEDERAL TRANSIT ADMIN FUNDS
707522 IS AN ASSOCIATED PROJECT.
DEKALB 7V7010
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH
ATLANTA TIP # DK AR 210B
CONG DIST. 4 & 11
CAPITAL 1997
$
80
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
64
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
OTH SHARE $
8
DEKALB 7V7025
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY MANAGER: STEVE KISH
ATLANTA TIP # DK AR 210C
CONG DIST. 4 & 11
CAPITAL 1998
$
84
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
67
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
OTH SHARE $
8
DEKALB 712870
STATUS:
I-20 @ LITHONIA INDUSTRIAL BLVD
ATLANTA TIP # DK AR 059
INTERCHANGE / NEW CONSTRUCTION
CONG DIST. 11
LENGTH(Mi1es/km): 3.50/5.63150 - EXIST. LANES: 0 /PROPOSED LANES: 4
MANAGER: G. ROSS
FUND SOURCE: DEMONSTRATION PROGRAM
COUNTY SIGNED 2-5-96 FOR UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1997
$ 6140
CONST 1997
$ 24675
FED SHARE $ 19740
GA. SHARE $ 4935
OTH SHARE $
DEKALB 713040
STATUS:
I-20 BARRIER WALLS @ CLOSE FRONTAGE RDS/ & ROCKDALE, NEWTON
ATLANTA TIP # DK AR 181
WALLS / MAINTENANCE
CONG DIST. 4 & 11
LENGTH(Miles/km): 18.70/30.08830 -EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: I-STATE MAINT.
REQ DEKALB, ROCKDALE & NEWTON DO UTILITIES 9-21-94
FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW NONE CONST
$
30
$
0
AFTER 99
DEKALB ATMS: COMMUN/SURVEIL'CE I-20 FM CAPITOL AE TO I-285/FULTON
ATLANTA TIP # AR 202
PE NONE
$
0
71315X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: KARL ALFF
FUND SOURCE: CONG MIT./AIR QUAL
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
713157 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DEKALB 713220
STATUS:
I-20 @WESLEY CHAPEL RD RELOC FRONTAGE RD(SNAPFINER)71Y220
ATLANTA TIP # DK AR 182A
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 11
LENGTH(Miles/km): 1.38/2.22042 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: A. ALEXANDER
FUND SOURCE: I-STATE MAINT.
REQ DEKALB DO UTILITIES & SIDEWALKS 7-16-96.
FEDERAL HIGHWAY ADMIN FUNDS
71Y220 IS AN ASSOCIATED PROJECT.
DEKALB 713280
STATUS:
I-285 @ SR 10/MEMORIAL DR & RELOCATE GEORGE LUTHER DR;71Y280
INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: D. SMITH REQ DEKALB DO UTILITIES 4-17-96.
ATLANTA TIP # DK AR 205A
CONG DIST. 4 & 11 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71Y280 IS AN ASSOCIATED PROJECT.
DEKALB 713320
STATUS:
I-285 @ SR 8/US 29/LAWRENCEVILLE HWY & 71Y320 FOR NH $
ATLANTA TIP # DK AR 184
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 4
LENGTH(Miles/km): .70/1.12630 -EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: BILL MOSKAL
FUND SOURCE: I-STATE MAINT.
REQ DEKALB DO UTILITIES 11-16-94
FEDERAL HIGHWAY ADMIN FUNDS
71Y320 IS AN ASSOCIATED PROJECT.
DEKALB 71340X
STATUS:
ATMS: I-285 CABLING, SEE FULTON CO - 713400
ATLANTA TIP # AR 200
UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: CONG MIT./AIR QUAL
FEDERAL HIGHWAY ADMIN FUNDS
713400 IS AN ASSOCIATED PROJECT.
DEKALB 713680
STATUS:
I-285 FM GLENWOOD RD TO I-85 SIGN REPLACEMENT W HI INTENSITY
ATLANTA TIP # AR 1300
SIGNING / SAFETY
CONG DIST. 4 & 11
LENGTH(Miles/km): 11.28/18.14952 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: I-STATE MAINT.
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 71Y220
STATUS:
I-20 @WESLEY CHAPEL RD RELOC FRONTAGE RD(SNAPFINER)713220 INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 2 /PROPOSED LANES:
MANAGER: A. ALEXANDER
ATLANTA TIP # DK AR 182B CONG DIST. 11 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 713220 IS AN ASSOCIATED PROJECT.
DEKALB 71Y320
STATUS:
I-285 @ SR 8/US 29/LAWRENCEVILLE HWY - FOR NH $ - SEE 713320
ATLANTA TIP # DK AR 184
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 4
LENGTH(Miles/km): .70/1.12630- EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER:
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
713320 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 14
FISCAL YEAR
COST ESTS
PE 1995 ROW 1998 CONST
UNDERWAY $ 1215
AFTER 99
PE 1997 ROW CONST
$
200
AFTER 99
AFTER 99
PE 1995 ROW 1998 CONST
UNDERWAY
$
85
AFTER 99
PE NONE
$
0
ROW NONE
$
0
CONST NONE $
0
PE NONE
$
ROW NONE $
CONST 1998 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 2000 1800
200
PE 1995 ROW 1998 CONST
UNDERWAY $ 1214 AFTER 99
PE 1995
ROW 19.98 CONST
UNDERWAY $ 3000 AFTER 99
"
,~.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 15
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--. I-.-N--O-. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DEKALB SR 124 @ STONE MOUNTAIN CRK
ATLANTA TIP # DK 099
PE 1992 UNDERWAY
721050 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
CONG DIST. 4
ROW NONE $
0
LENGTH(Miles/km): .03/.04827
CONST 1998 $ 682
MANAGER: D. GODWIN
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 546
STATUS: SGN GWINNETT CO 2-19-87 & DEKALB 9-10-86 FOR UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 136
OTH SHARE $
DEKALB 721330
STATUS:
SR 124/ROCK CHAPEL RD FM UNION GR RD N TO MADDOX RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .90/1.44810 MANAGER: D. GODWIN DEKALB SGN 9-2-88 FOR UTILITIES.
ATLANTA TIP # DK 084 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1996 UNDERWAY
CONST 1998 $ 1576 FED SHARE $ 1261 GA. SHARE $ 315 OTH SHARE $
DEKALB 721535
STATUS:
SR 124 FM MADDOX RD TO ROCKBRIDGE RD / INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.10/4.98790 MANAGER: D. GODWIN REQ DEKALB CO DO UTILITIES 10-30-91
ATLANTA TIP # DK 085 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW 1997 UNDERWAY
CONST 1998 $ 5207 FED SHARE $ 4166 GA. SHARE $ 1041 OTH SHARE $
DEKALB 730970
STATUS:
SR 212/BROWNS MILL RD @ POLE BRIDGE CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .42/.67578
MANAGER: D. GODWIN REVISION REQUEST DEKALB DO UTILITIES 8-16-96.
ATLANTA TIP # DK 098 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1997
$
42
CONST 1997 $ 800
FED SHARE $ 640
GA. SHARE $ 160
OTH SHARE $
DEKALB 751370
STATUS:
CHAMBLEE-TUCKER RD FM NEW P'TREE RD TO BUFORD HWY/SR 13 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 1.40/2.25260
MANAGER: D. GODWIN DEKALB SGN FOR UTILITIES 4-25-94
ATLANTA TIP # DK 001B CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 75Y370 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW 19"95 UNDERWAY
CONST 1997 $ 2000
FED SHARE $ 1600
GA. SHARE $
400
OTH SHARE $
DEKALB 751495
STATUS:
SR 859/COOLEDGE-BROCKETT RD FM STONE MTN FWY-SR 8/W SIGNALS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.00/1.60900 MANAGER: D. GODWIN DEKALB SGN DO UTILITIES 3-5-90.
ATLANTA TIP # DK 079B CONG DIST. 4 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW CONST
$
42
AFTER 99
AFTER 99
DEKALB 752100
STATUS:
EAST PONCE DE LEON AT RAYS ROAD
ATLANTA TIP # DK 102
INTERSECTION IMPROVEMENT / RECST. OR REHAB.
CONG DIST. 4
LENGTH(Miles/km): .40/.64360- EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN
FUND SOURCE: HWY. SAFETY
COUNTY SGN CONTRACT FOR PE, ROW & UTILITIES 7-14-94
FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1993 UNDERWAY
ROW LOCL
CONST 1997 $ 689
FED SHARE $ 620
GA. SHARE $
69
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 16
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
* -P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-ST--S--
DEKALB SR 155/CANDLER RD AT SHOAL CREEK AREA
ATLANTA TIP AR 157D
PE 1996 UNDERWAY
752770 SHOULDER WORK / SAFETY
CONG DIST. 4
LENGTH(Miles/km): .20/.32180- EXIST. LANES: 0 /PROPOSED LANES: 0
ROW 1998 CONST
$
23
AFTER 99
MANAGER: BILL MOSKAL
FUND SOURCE: HWY. SAFETY
STATUS: DECATUR SGN DO UTILITIES 3-21-96.
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 770840
STATUS:
SR 8 @ DEKALB IND WAY,SCOTTDALE; N DECATUR RD @ SCOTTDALE RD
ATLANTA TIP # DK 123
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 4
LENGTH(Miles/km): .20/.32180- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: HWY. SAFETY
DEKALB SGN FOR ROW & UTILITIES 8-23-94
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 770860
STATUS:
INSTALL TRAFFIC SIGNALS AT 52 INTERSECTION IN DEKALB COUNTY
* ATLANTA TIP DK 124
SIGNALS / SAFETY
CONG DIST. 4 & 11
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: HWY. SAFETY
DEKALB SIGNED FOR ROW & UTILILITIES 1-18-95
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 770910
STATUS:
SIDEWALKS AT KENSINGTON RD, COVINGTON HWY & MEMORIAL DRIVE
* ATLANTA TIP DK AR 165IJK
SIDEWALKS / NEW CONSTRUCTION
CONG DIST. 11 & 4
LENGTH(Miles/km): 1.79/2.88011 -EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 770911
STATUS:
SIDEWALKS AT BUFORD HWY, NEW PEACHTREE RD. & SHALLOWFORD RD.
ATLANTA TIP # DK AR 165CDE
SIDEWALKS / NEW CONSTRUCTION
CONG DIST. 4
LENGTH(Miles/km): 3.99/6.41991 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 770912
STATUS:
SIDEWALKS AT BRIARWOOD ROAD & DRESDEN ROAD
ATLANTA TIP # DK AR 165AB
SIDEWALKS / NEW CONSTRUCTION
CONG DIST. 4
LENGTH(Miles/km): 1.21/1.94689 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 770913
STATUS:
SIDEWALKS AT NEW PEACHTREE, PEACHTREE RDS. & PEACHTREE INDUS
* ATLANTA TIP DK AR 165FGH
SIDEWALKS / NEW CONSTRUCTION
CONG DIST. 4
LENGTH(Miles/km): 2.69/4.32821 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997 $ 123
FED SHARE $
111
GA. SHARE $
12
OTH SHARE $
PE NONE $
0
ROW LOCL
CONST 1997
$
350
FED SHARE $ 315
GA. SHARE $
35
OTH SHARE $
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
142
FED SHARE $ 114
GA. SHARE $
OTH SHARE $
28
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
316
FED SHARE $ 253
GA. SHARE $
OTH SHARE $
63
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997 $
96
FED SHARE $
77
GA. SHARE $
OTH SHARE $
19
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
213
FED SHARE $ 170
GA. SHARE $
OTH SHARE $
43
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
20-Sep-1996 Page 17
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
ARC REGIONAL DEVELOPMENT COMMISSION
COMMENTS
FISCAL YEAR
COST ESTS
----------------------------------------------------------------------------------------------------------------------~------------
DEKALB RESTORE PONCE DE LEON LINEAR PARK EAST OF BRIARCLIFF--77Y990
ATLANTA TIP # AT 103
PE LOCL
770990 LANDSCAPING / ENHANCEMENT
CONG DIST. 4
ROW LOCL
LENGTH(Mi1es/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1997
$
720
MANAGER: D. CRANFORD
FUND SOURCE: TRANS. ENHANCE.
FED SHARE $
600
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
77Y990 IS AN ASSOCIATED PROJECT.
OTH SHARE $
120
DEKALB 770992
STATUS:
SOUTH PEACHTREE CREEK TRAIL
ATLANTA TIP # DK 212
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 4
LENGTH(Miles/km): 4.00/6.43600 -EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CRANFORD
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1997
$
700
FED SHARE $ 560
GA. SHARE $
OTH SHARE $ 140
DEKALB 771037
STATUS:
MARTA SERVICE EXPANSION: COVINGTON HWY
ATLANTA TIP # M AR 161C
TRANSIT PROJECTS / CAPITAL
CONG DIST. 11
LENGTH(Miles/km): ,00/.00000- EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE $
0
CONST 1997
$
145
FED SHARE $ 116
GA. SHARE $
OTH SHARE $
29
DEKALB 77Y990
STATUS:
RESTORE PONCE DE LEON LINEAR PARK-FOR 1998 FUNDS; SEE 770990 LANDSCAPING / ENHANCEMENT LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: UNKNOWN TO BE DONE BY CONTRACT
ATLANTA TIP # AT 103 CONG DIST. 4 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS 770990 IS AN ASSOCIATED PROJECT.
PE LOCL
ROW LOCL
CONST 1998
$
250
FED SHARE $
200
GA. SHARE $
OTH SHARE $
50
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P. I. NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DOUGLAS 7D7516
STATUS:
CAPITAL/PLANNING - MULTI-USE FACILITY & EXPR. TRANSIT STUDY
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH
ATLANTA TIP # DO AR 301B CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
20-Sep-1996 Page 18
FISCAL YEAR
COST ESTS
CAPITAL 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1114 891 111 111
DOUGLAS 7D7528
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1997
TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH
ATLANTA TIP # DO AR 300B
CONG DIST. 7
OPERATING 1997 $
31
FUND SOURCE: URBAN TRANSIT
FED SHARE $
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
16
DOUGLAS 7D7529
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1998 TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH
ATLANTA TIP # DO AR 300C
CONG DIST. 7
OPERATING 1998 $
31
FUND SOURCE: URBAN TRANSIT
FED SHARE $
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
16
DOUGLAS 7D7530
STATUS:
CAPITAL IMPROVEMENT - TRANSIT PROJECT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY
MANAGER: STEVE KISH
ATLANTA TIP # DO AR 301C CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$ 150
FED SHARE $ 120
GA. SHARE $
15
OTH SHARE $
15
DOUGLAS 7V7012
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY
MANAGER: STEVE KISH
ATLANTA TIP # DO AR 213B
CONG DIST. 7
CAPITAL 1997
$
30
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
DOUGLAS 7V7026
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY MANAGER: STEVE KISH
ATLANTA TIP # DO AR 213C
CONG DIST. 7
CAPITAL 1998
$
31
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
DOUGLAS 712930
STATUS:
SR 92 BRIDGE & APPROACHES OVER I-20 IN DOUGLASVILLE/71Y930
ATLANTA TIP # DO AR 208A
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 7
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 4 /PROPOSED LANES: 7
MANAGER: KEVIN HOSEY
FUND SOURCE: I-STATE MAINT.
REQ CITY DO UTIL 7-20-92; DOUGLAS CO SGN 8-18-92 PUB UTIL.
FEDERAL HIGHWAY ADMIN FUNDS
71Y930 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1997 ROW 1998 CONST
$
30
$ 150
AFTER 99
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DOUGLAS 713490
STATUS:
I-20 @ SR 61 CONN INTERCHANGE RECONSTRUCTION CONSTRUCTION OF NEW ROUTE WITH 0 LANES PROPOSED.
LENGTH(Miles/km): .00/.00000 MANAGER: J. GRAYBEAL RESUB TO CO DO ROW & UTIL 3-10-95; CITY SGN 2-28-95 ROW/UTIL
ATLANTA TIP # DO 017A CONG DIST. 7
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
DOUGLAS 721320
STATUS:
BANKHEAD HWY FM SWEETWATER RD E TO THORNTON RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.10/1.76990 MANAGER: D. SMITH
DOUGLAS 721420
STATUS:
SR 92 FM S/SR 166 NE TO LAKE MONROE RD/CR 140 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.26/3.63634 MANAGER: KEVIN HOSEY
DOUGLAS SIGNED FOR UTILITIES 5-2-95
ATLANTA TIP # DO 016 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721380 IS AN ASSOCIATED PROJECT.
ATLANTA TIP # DO 028 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 19
FISCAL YEAR
COST ESTS
PE 1995 UNDERWAY
ROW LOCL
CONST 1997
$ 2100
FED SHARE $ 1680
GA. SHARE $ 420
OTH SHARE $
PE 1992 ROW 1998 CONST
UNDERWAY $ 1595 AFTER 99
PE 1992
ROW 1997 CONST
UNDERWAY
$ 2301 AFTER 99
DOUGLAS 751820
STATUS:
DOUGLAS BLVD EXT FM CR 814 TO CR 115 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 1.80/2.89620 MANAGER: J. GARLAND REQ DOUGLASVILLE DO ROW, UTIL & DET 4-17-96.
ATLANTA TIP # DO 032 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$ 103 AFTER 99
DOUGLAS 751825
STATUS:
DOUGLAS BLVD EXT FM CR 142 TO CR 814 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
LENGTH(Miles/km): 2.00/3.21800 MANAGER: J. GARLAND REQ DOUGLASVILLE DO ROW, UTIL & DET 5-10-96.
ATLANTA TIP # DO 031 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$ 103 AFTER 99
DOUGLAS 770975
STATUS:
BICYCLE/PEDESTRIAN FAC'S FOR SIGNAGE, BICYCLE/FED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. MANAGER: D. GODWIN TO BE DONE BY CONTRACT
RACKS & STRIPING LANES: 0 /PROPOSED LANES:
ATLANTA TIP # DO AR 177A CONG DIST. 7
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
DOUGLAS 770976
STATUS:
BICYCLE/PEDESTRIAN SIGNS, RACKS, STRIPING @ LITHIA SPGS BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: D. GODWIN TO BE DONE BY CONTRACT
ATLANTA TIP # DO AR 177B CONG DIST. 7 0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
31
FED SHARE $
25
GA. SHARE $
OTH SHARE $
6
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997 $
5
FED SHARE $
4
GA. SHARE $
OTH SHARE $
1
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
20-Sep-1996 Page 20
FISCAL YEAR
COST ESTS
FAYETTE 3V7013
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH
ATLANTA TIP # FA AR 100B
CONG DIST. 3
CAPITAL 1997
$
30
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
FAYETTE 3V7024
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH
ATLANTA TIP # FA AR 100C
CONG DIST. 3
CAPITAL 1998
$
31
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
FAYETTE 321964
STATUS:
SR 85 FM SR 74 N TO BERNHARD RD/CR 126 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.30/5.30970 MANAGER: M. REYNOLDS FAYETTE REFUSED TO DO UTILITIES 2-17-93
ATLANTA TIP # FA 005 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 321966 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1998 CONST
UNDERWAY $ 2155 AFTER 99
FAYETTE 322350
STATUS:
SR 74 FM JUST SOUTH OF CROSSTOWN RD NW TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.15/3.45935
MANAGER: M. REYNOLDS REQ P'TREE CITY DO UTIL 5-22-96;FAYETTE REFUSED UTIL 5/96.
ATLANTA TIP # FA 009B CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1998 CONST
UNDERWAY $ 5079 AFTER 99
FAYETTE 322650
STATUS:
SR 74 AT PASCHALL ROAD IN PEACHTREE CITY
ATLANTA TIP # FA 009A
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 3
LENGTH(Miles/km): .40/.64360- EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
PEACHTREE CITY SIGNED FOR ROW & UTILITIES 2-16-95
FEDERAL HIGHWAY ADMIN FUNDS
FAYETTE 322670
STATUS:
SR 74 @ 8 INTERSECTIONS BET SENOIA RD & MILAM RD/FULTON
ATLANTA TIP # FA 019
ACCELERATION/DECEL LANE / SAFETY
CONG DIST. 3
LENGTH(Miles/km): 2.60/4.18340 - EXIST. LANES: 4 /PROPOSED LANES: 5
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
REQ CO RU 1/96;PCHTREE CTY SGN RU 5/95;TYRONE SGN RU 6/95
FEDERAL HIGHWAY ADMIN FUNDS
FAYETTE 72104X
STATUS:
SR 54 @ MORNING & CAMP CRKS; FLINT RIVER/SEE CLAYTON CO
ATLANTA TIP # CL 023
UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M. REYNOLDS
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
721040 IS AN ASSOCIATED PROJECT.
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1994
UNDERWAY
ROW LOCL
CONST 1997
$
195
FED SHARE $
176
GA. SHARE $
20
OTH SHARE $
PE NONE
$
ROW LOCL
CONST 1998 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0
1163 1047
116
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
FAYETTE 721440
STATUS:
SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 ... & CLAYTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 5.30/8.52770
MANAGER: M. REYNOLDS CLAYTON SGN 4/95 & WANTS COST EST; FAYETTE SGN $75K 6/95
ATLANTA TIP # CL 041 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72144X IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 21
FISCAL YEAR
COST ESTS
PE 1997 ROW CONST
$ 144 AFTER 99 AFTER 99
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
20-Sep-1996 Page 22
FISCAL YEAR
COST ESTS
FULTON 7D7507
STATUS:
RAIL CONSTRUCTION PROGRAM - NORTH LINE EXTENSION - MEDICAL
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 300B
CONG DIST. 5 & 4
CAPITAL 1997
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
73250 58600
14650
FULTON 7D7508
STATUS:
FIXED GUIDEWAY MODERNIZATION PROGRAM - LINE STRUCTURE REHAB, TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 3018
CONG DIST. 5 & 4
CAPITAL 1997
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
7247 5798
1449
FULTON 7D7509
STATUS:
FIXED GUIDEWAY MODERNIZATION PROGRAM - LINE STRUCTURE REHAB, TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 301C
CONG DIST. 5 & 4
CAPITAL 1998
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
7247 5798
1449
FULTON 7D7510
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1997 TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 208B
CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT
OPERATING 1997
$
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
7D751X IS AN ASSOCIATED PROJECT.
OTH SHARE $
4925 2463
2463
FULTON 7D7511
STATUS:
CAPITAL/PLANNING - CAPITAL MAINTENANCE, BUS PROCUREMENT, TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 210B CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
25126 20101
5025
FULTON 7D7521
STATUS:
RAIL CONSTRUCTION PROGRAM - NORTH LINE EXTENSION - MEDICAL TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 300C
CONG DIST. 5 & 4
CAPITAL 1998
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
65125 52100
13025
FULTON 7D7522
STATUS:
BUS RELATED PROCUREMENT - 50 BUSES TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 302B
CONG DIST. 5 & 4
CAPITAL 1997
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
7D752X IS AN ASSOCIATED PROJECT.
OTH SHARE $
14500 11600
2900
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
"'
'>
___ ~:; ~--- ~'
;.:-..____,
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 23
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON BUS RELATED PROCUREMENT - 96 BUSES
ATLANTA TIP # M AR 302C
7D7523 TRANSIT PROJECTS / CAPITAL
CONG DIST. 5 & 4
FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CAPITAL 1998
$ 27840
FUND SOURCE: URBAN TRANSIT DISC,
FED SHARE $ 22272
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $ 5568
FULTON 7D7525
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1998 TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 208C CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998 $ FED SHARE $
GA. SHARE $ OTH SHARE $
4715 2358
2358
FULTON 7D7526
STATUS:
CAPITAL/PLANNING - CAPITAL MAINTENANCE, BUS PROCUREMENT, TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
ATLANTA TIP # M AR 210C CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
25126 20101
5025
FULTON 7D7544
STATUS:
ATLANTA-ATHENS COMMUTER RAIL LINE-FOR PRELIMINARY RAIL PROJECTS / PLANNING FUNDS RECIPIENT: MANAGER: STEVE KISH ENGINEERING STUDIES; ALSO CLARKE COUNTY
7D754Z
ATLANTA TIP # AR 235
CONG DIST. 5 & 10
PLANNING 1997
$
145
FUND SOURCE: NON FEDERAL TRANSIT
FED SHARE $
7D754Z IS AN ASSOCIATED PROJECT.
GA. SHARE $
145
OTH SHARE $
FULTON 7V7015
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY
MANAGER: STEVE KISH
ATLANTA TIP # FN/S AR 200B
CONG DIST. 5
CAPITAL 1997
$
87
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
70
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
9
OTH SHARE $
9
FULTON 7V7027
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY MANAGER: STEVE KISH
ATLANTA TIP # FN/S AR 200C
CONG DIST. 5
CAPITAL 1998
$
91
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
73
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
9
OTH SHARE $
9
FULTON 712360
STATUS:
I-285 @ WASHINGTON RD/INCL WDN WASHINGTO RD 600' W OF BR
INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .51/.82059 -EXIST. LANES: 4 /PROPOSED LANES: MANAGER: D. CHURCH SIGNED CITY OF EAST POINT 3-16-87 FOR UTILITIES
ATLANTA TIP # FS 017A CONG DIST. 5 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1988 UNDERWAY
ROW 1991 UNDERWAY
CONST 1998
$ 2286
FED SHARE $ 2057
GA. SHARE $ 229
OTH SHARE $
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 24
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-OM--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON I-75 @ MT PARAN ROAD - RELOC RAMP; & 71Y940-IM RW
ATLANTA TIP # AR 105A
PE 1993 UNDERWAY
712940 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 5
LENGTH(Miles/km): .30/.48270- EXIST. LANES: 0 /PROPOSED LANES: 0
ROW NONE CONST 1997
$
0
$ 2162
MANAGER: G. ROSS
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE $ 1730
STATUS: CITY OF ATLANTA HAS NO UTIL INVOLVED.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
432
71Y940 IS AN ASSOCIATED PROJECT.
OTH SHARE $
FULTON 712950
STATUS:
I-85 @ MONROE DRIVE & 71Y950 FOR 04M $ FOR R/W
ATLANTA TIP # AT AR 106B
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 4
LENGTH(Miles/km): .30/.48270- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS
FUND SOURCE: CONG MIT./AIR QUAL
CITY OF ATLANTA HAS NO UTILITIES INVOLVED.
FEDERAL HIGHWAY ADMIN FUNDS
71Y950 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1997
$ 4590
FED SHARE $ 3672
GA. SHARE $ 918
OTH SHARE $
FULTON 713157
STATUS:
ATMS: COMMUN/SURVEIL'CE I-20 FM CAPITOL AE TO I-285/DEKA
ATLANTA TIP # AR 202
MISCELLANEOUS IMPROVEMENTS / SAFETY
CONG DIST. 11 & 5
LENGTH(Miles/km): 9.70/15.60730- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
71315X IS AN ASSOCIATED PROJECT.
PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $
GA. SHARE $ OTH SHARE $
0
0 6400 5120 1280
FULTON 713310
STATUS:
I-285 @ SR 54/JONESBORO RD; & 71Y310 INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 5 /PROPOSED LANES: MANAGER: D. SMITH REQ FULTON DO UTILITIES 4-17-96;FOREST PARK REF DO UTL 5-96.
ATLANTA TIP # AT AR 204A CONG DIST. 5
8 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71Y310 IS AN ASSOCIATED PROJECT.
PE 1997 ROW CONST
$ 400 AFTER 99 AFTER 99
FULTON 713330
STATUS:
I-285 SOUTH TO I-20 WEST RAMP GEOMETRY WEST OF ATLANTA
ATLANTA TIP # AT AR 178
RAMP / RECST. OR REHAB.
CONG DIST. 5
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. SMITH
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW 1998 CONST
UNDERWAY $ 100 AFTER 99
FULTON 713400
STATUS:
ATMS: I-285 SURVEILL FM I-75 IN COBB E TO I-85 IN DEKALB
ATLANTA TIP # AR 200
MISCELLANEOUS IMPROVEMENTS / SAFETY
CONG DIST. 5 & 6
LENGTH(Miles/km): 13.17/21.19053 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
71340X IS AN ASSOCIATED PROJECT.
FULTON 71Y940
STATUS:
I-75 @ MT PARAN ROAD - FOR 04M RW $; INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .30/.48270- EXIST.
MANAGER: UNKNOWN
SEE 712940 LANES: 0 /PROPOSED
LANES:
ATLANTA TIP # AT AR 105B CONG DIST. 5 0 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712940 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE $
ROW NONE $
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 2000 1600 400
PE 1993 ROW 1997 CONST NONE
UNDERWAY
UNDERWAY
$
0
<"-
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 25
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--. I-.-N--O-. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON I-85 @ MONROE DRIVE - FOR 04M R/W FUNDS; SEE 712950
ATLANTA TIP # AT AR 106A
PE 1993 UNDERWAY
71Y950 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 4
ROW 1997
$ 12100
LENGTH(Miles/km): .30/.48270- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE $
0
MANAGER:
FUND SOURCE: I-STATE MAINT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
712950 IS AN ASSOCIATED PROJECT.
FULTON 720570
STATUS:
BANKHEAD HWY/SR 8 FM PROCTOR CRK TO E OF SCL RR BRIDGE RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. LENGTH(Miles/km): .51/.82059
MANAGER: BILL MOSKAL CITY OF ATLANTA SIGNED 9/6/89 FOR UTILITIES
ATLANTA TIP # AT 004 CONG DIST. 5
FUND SOURCE: NAT 1 L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1998 CONST
UNDERWAY
$ 1421 AFTER 99
FULTON 721010
STATUS:
SR 9/ROSWELL FM DUNWOODY PL TO 5-LANE SECTION N OF HILL ST RECONSTRUCTION & WIDENING FROM 3 LANES TO 4 LANES. LENGTH(Miles/km): 2.20/3.53980 MANAGER: RAY METTS REQ FULTON DO P UTL 5/96;CT REQ ROSWELL DO PE, UTIL 3-28-96
ATLANTA TIP # FN 007A CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1998 CONST
UNDERWAY $ 9000 AFTER 99
FULTON 721460
STATUS:
SR 9 @ C'HOOCHEE RVR & BIG CK & INT @ AZALEA & RIVERSIDE/"Y" REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 8 LANES.
LENGTH(Miles/km): .49/.78841 MANAGER: RAY METTS REQ CO DO P UTIL 12-2-91;CT REQ ROSWELL DO PE 1 UTIL 3-28-96
ATLANTA TIP # FN 007B CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72Y460 IS AN ASSOCIATED PROJECT.
FULTON 721810
STATUS:
SR 166/LAKEWOOD FWY @ GREENBRIAR PKWY/CAMPBELLTON RD ML9.37
ATLANTA TIP # AT 062
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 5
LENGTH(Miles/km): .84/1.35156 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. CHURCH
FUND SOURCE: NAT'L HIGHWAY
REQ ATLANTA DO UTIL & EAST POINT PUB UTIL 12-29-94
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1997 $ 2312
CONST 1998
$ 6092
FED SHARE $ 4874
GA. SHARE $ 1218
OTH SHARE $
PE 1997 ROW 1998 CONST
UNDERWAY $ 10800 AFTER 99
FULTON 721850
STATUS:
SR 400 @ HAMMOND, ABERNATHY, CD SYSTEM
ATLANTA TIP # FN AR 100
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 5
LENGTH(Miles/km): 1.75/2.81575 -EXIST. LANES: 8 /PROPOSED LANES: 12 .
MANAGER: G. BOWMAN
FUND SOURCE: NAT'L HIGHWAY
CO SGN CONTRACT FOR $4.9M TOWARD PE, ROW, UTIL & CST 5-5-93
FEDERAL HIGHWAY ADMIN FUNDS
FULTON 721930
STATUS:
SR 120/0LD MILTON PARKWAY AT STATE BRIDGE ROAD TURN LANES / SAFETY LENGTH(Miles/km): .36/.57924- EXIST. LANES: 2 MANAGER: G. BOWMAN N0 UTILITY COST 8-9-95; RW UNDER 751410
/PROPOSED
LANES:
ATLANTA TIP # FN 048B CONG DIST. 6 4 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1993 UNDERWAY
ROW 1997 $ 15207 CONST 1997 $ 54875
FED SHARE $ 43900 GA. SHARE $ 6075
OTH SHARE $ 4900
PE NONE $
0
ROW NONE $
0
CONST 1997 $ 182
FED SHARE $ 182
GA. SHARE $
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 26
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R-. -------E-S-T-S--
FULTON SR 9 @ C'HOOCHEE RVR/INCL INT - FOR 33P FUNDS; SEE 721460
ATLANTA TIP # FN 007C
PE NONE
$
0
72Y460 BRIDGES / RECST. OR REHAB.
CONG DIST. 6
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 MANAGER: RAY METTS STATUS:
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONST 1998
$
480
FED SHARE $
432
GA. SHARE $
48
721460 IS AN ASSOCIATED PROJECT.
OTH SHARE $
FULTON 730756
STATUS:
SOUTH FULTON PKWY FM CAPPS FERRY RD TO COCHRAN MILL RD CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 6.10/9.81490
MANAGER: G. ROSS FULTON SGN DO ROW, UTIL & DESIGN 12-6-89.
ATLANTA TIP # FS 036B CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
5
AFTER 99
FULTON 731430
STATUS:
OLD MILTON PKY(ST BRIDGE) FM ALPHA CT TO PARK BRIDGE PKWY
ATLANTA TIP # FN 015B
LANDSCAPING / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 2.34/3.76506- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. BOWMAN
FUND SOURCE: SURFACE TRANSPORT.
REQ FULTON TO MAINTAIN ALL LANDSCAPING 7/1/96.
FEDERAL HIGHWAY ADMIN FUNDS
FULTON 731580
STATUS:
SR 141/PEACHTREE ROAD/TOWER PLACE DRIVE
ATLANTA TIP # AT 099
TURN LANES / SAFETY
CONG DIST. 5
LENGTH(Miles/km): .20/.32180- EXIST. LANES: 6 /PROPOSED LANES: 7
MANAGER: G. BOWMAN
FUND SOURCE: HWY. SAFETY
REQ ATLANTA DO UTILITIES 2-5-96.
FEDERAL HIGHWAY ADMIN FUNDS
FULTON 742482
STATUS:
SR 166/LAKEWOOD FWY EB EXIT RAMP @ SYLVAN RD INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .19/.30571- EXIST. LANES: MANAGER: D. GODWIN OTO REQ EAST POINT DO ROW, UTIL 10-13-94
4 /PROPOSED LANES:
ATLANTA TIP # AT AR 116 CONG DIST. 5
4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE $
0
CONST 1997
$
288
FED SHARE $ 230
GA. SHARE $
58
OTH SHARE $
PE 1996 UNDERWAY
ROW 1997 $ 150
CONST 1997
$
179
FED SHARE $
161
GA. SHARE $
18
OTH SHARE $
PE 1997 ROW NONE CONST
$
5
$
0
AFTER 99
FULTON 742860
STATUS:
SPALDING DR FM MT VERNON RD TO SR 140
ATLANTA TIP # FN OBB
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 6
LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
742B6X IS AN ASSOCIATED PROJECT.
FULTON 750780
STATUS:
BANKHEAD HWY/SR B FM HARWELL RD TO SR 280/HIGHTOWER RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1. 30/2.09170 MANAGER: D. SMITH CITY OF ATLANTA SGN DO ROW & UTILITIES 4-16-96.
ATLANTA TIP # AT 001 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW LOCL CONST
$
40
AFTER 99
PE 1997
ROW LOCL CONST
$
5
AFTER 99
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 27
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON HOWELL MILL RD/ATLANTA FM OLD CHATTAHOOCHEE TO BELLMEADE AVE
ATLANTA TIP # AT 026
PE 1997
$
9
751560 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 5
ROW LOCL
LENGTH(Miles/km): .10/.16090
CONST
AFTER 99
MANAGER: D. CHURCH
FUND SOURCE: SURFACE TRANSPORT.
STATUS: CITY OF ATLANTA SGN DO ROW & UTILITIES 4-16-96.
FEDERAL HIGHWAY ADMIN FUNDS
FULTON 751900
STATUS:
SR 14/US 29/PETERS ST FM FAIR TO NELSON OVER RR & SPRING ST REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450 MANAGER: A. ALEXANDER REQ CITY OF ATLANTA DO UTILITIES 7-18-95
FULTON 752020
STATUS:
PEACHTREE ST @ GEORGIA RR & MARTA AT UNDERGROUND ATLANTA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450 MANAGER: A. ALEXANDER REQ CITY OF ATLANTA DO RUD 4-19-95;FULTON N/A 5-8-96.
FULTON 752030
STATUS:
INTERNATIONAL BLVD @ CSX & NORFOLK-SOUTHERN RR @ THE OMNI REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450 MANAGER: A. ALEXANDER REQ CITY OF ATLANTA DO ROW, UTILITIES & DETOURS 4-19-95
FULTON 752040
STATUS:
ROXBORO RD FM E PACES FERRY RD TO ROCKHAVEN CIR & SOU RR BR BRIDGES / REPLACEMENT LENGTH(Miles/km): .18/.28962 MANAGER: G. BOWMAN ATLANTA SIGNED FOR ROW, UTILITIES & 100% PE 2-17-95
ATLANTA TIP # AT 071 CONG DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP # AT 069 CONG DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP # AT 068 CONG DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP # AT 009A CONG DIST. 4 & 5 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1997
$ 6671
CONST 1998
$ 4711
FED SHARE $ 3769
GA. SHARE $
942
OTH SHARE $
PE 1992
UNDERWAY
ROW LOCL
CONST 1998
$ 2021
FED SHARE $ 1617
GA. SHARE $
404
OTH SHARE $
PE 1993 UNDERWAY
ROW LOCL
CONST 1998
$ 1580
FED SHARE $ 1264
GA. SHARE $
316
OTH SHARE $
PE 1998 ROW LOCL CONST
$
50
AFTER 99
FULTON 752070
STATUS:
SR 139/MLK DR AT FAIRBURN RD AND BAKERS FERRY ROAD INTERSECTION IMPROVEMENT / RECST. OR REHAB. LENGTH(Miles/km): .30/.48270- EXIST. LANES: 4 /PROPOSED LANES:
MANAGER: D. GODWIN ATLANTA REQ CT FOR ROW, UTIL, PE & ALL CST OVER BOOK 7/15/96
ATLANTA TIP # AT 079A CONG DIST. 5 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1033 795 5 233
FULTON 752075
STATUS:
SR 139/MLK JR DR FM HIGHTOWER RD TO BARFIELD AVE INTERSECTION IMPROVEMENT / RECST. OR REHAB. LENGTH(Miles/km): .42/.67578- EXIST. LANES: 4 /PROPOSED LANES:
MANAGER: D. GODWIN ATLANTA SGN CT FOR ROW, UTIL, PE & 20% CST 8-11-95 - 752070
ATLANTA TIP # AT 079B CONG DIST. 5 5 FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH _SHARE $
1000 800
200
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
FULTON 752230
STATUS:
SR 54/JONESBORO RD. OVER THE SOUTH RIVER IN ATLANTA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN ATLANTA SIGNED FOR UTILITIES 2-17-95
ATLANTA TIP # AT 095 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 752320
STATUS:
POWERS FERRY RD/CR 300 OVER LONG ISLAND CREEK
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .31/.49879
MANAGER: D. GODWIN REQ FULTON COUNTY DO ROW, UTILITIES & DETOURS 4-19-95
ATLANTA TIP # FN 085 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 752520
STATUS:
CS 1985/MITCHELL STREET @ SOUTHERN RAILROAD .2 MI W OF SR 3E REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .29/.46661 MANAGER: A. ALEXANDER ATLANTA SGN DO ROW, UTILITIES & DETOURS 2-17-95
ATLANTA TIP # AT 097 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 752540
STATUS:
CS 2661/HOLLYWOOD ROAD @ PROCTOR CREEK 1.8 MIN OF JCT US 78 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN ATLANTA SGN FOR ROW, UTILITIES & NECESSARY DETOURS 2-17-95
ATLANTA TIP # AT 081 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 752545
STATUS:
CR 1349/FAIRBURN ROAD @ CSX RAILROAD .5 MI S OF JCT SR 166 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN ATLANTA SGN DO ROW, UTILITIES & DETOURS 10-3-95 (FULTON N/A)
ATLANTA TIP # AT 096 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 752550
STATUS:
CS 1259/LAKEWOOD AVE @ NORFOLK SOUTHERN RR S. OF MILTON ST REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: D. GODWIN CT REQ ATLANTA DO PE, UTIL & ROW 5-14-96.
ATLANTA TIP # AT 023 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 752560
STATUS:
CS 3586/SPRING STREET @ SOU RR, CSX RR REPLACEMENT REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .48/.77232 MANAGER: A. ALEXANDER CT REQ ATLANTA DO PE, UTIL & ROW 7-19-96.
ATLANTA TIP # AT 086B CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 28
FISCAL YEAR
COST ESTS
PE 1995 UNDERWAY
ROW 1997 $
50
CONST 1998 $ 585
FED SHARE $ 468
GA. SHARE $ 117
OTH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1997 $ 389
FED SHARE $ 311
GA. SHARE $
78
OTH SHARE $
PE 1995 UNDERWAY ROW LOCL
CONST 1998 $ 3100 FED SHARE $ 2480 GA. SHARE $ 620 OTH SHARE $
PE 1995 UNDERWAY ROW LOCL
CONST 1997 $ 592 FED _$HARE $ 474 GA. SHARE $ 118 OTH SHARE $
PE 1996 UNDERWAY ROW LOCL
CONST 1998 $ 880 FED SHARE $ 704 GA. SHARE $ 176 OTH SHARE $
PE 1996 UNDERWAY ROW LOCL
CONST 1998 $ 1519 FED SHARE $ 1215 GA. SHARE $ 304 OTH SHARE $
PE 1997 ROW LOCL CONST
$ 211 AFTER 99
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 29
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON CR 1349/FAIRBURN ROAD @ CSX RAILROAD 1.8 MI S OF INT SR 139
ATLANTA TIP # AT 100
PE 1996 UNDERWAY
752570 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 5
ROW LOCL
LENGTH(Miles/km): .22/.35398
MANAGER: D. GODWIN STATUS: REQ FULTON & ATLANTA DO ROW, UTILITIES & DETOURS 8-26-94
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONST 1998
$
FED SHARE $
GA. SHARE $
1342 1074
268
OTH SHARE $
FULTON 752580
STATUS:
CR 495/0LD FAIRBURN ROAD @ CAMP CREEK .03 MI S CAMP CRK PKY REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES. LENGTH(Miles/km): .21/.33789 MANAGER: D. GODWIN REQ FULTON COUNTY DO ROW, UTILITIES & DETOURS 8-26-94
ATLANTA TIP # FS 069 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
871
FED SHARE $
697
GA. SHARE $ 174
OTH SHARE $
FULTON 752620
STATUS:
CS 3242/PINE GROVE ROAD @ WILLEO CREEK AT W. ROSWELL CITY LI REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN REQ FULTON RUD 7/95;COBB SGN RUO 6/96;ROSWELL SGN PUR 5/96.
ATLANTA TIP # FN 096 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
13
AFTER 99
FULTON 752650
STATUS:
HAYNES BRIDGE RD FM OLD ALABAMA RD TO BIG CREEK RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.37/3.81333 MANAGER: G. BOWMAN TO BE DONE BY CONTRACT.
ATLANTA TIP # FN 031 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
5
AFTER 99
FULTON 752710
STATUS:
CS 3498/ATLANTA RD @ CHATTAHOOCHEE RIVER FULTON-COBB CO LINE REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .30/.48270
MANAGER: D. GODWIN REQ FULTON/ATLANTA DO RUD 3-5-96;COBB SGN DO RUD 5-14-96.
ATLANTA TIP # AT 104 CONG DIST. 5 & 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
45
AFTER 99
FULTON 762370
STATUS:
SR 400 DETENTION POND @ LONGLEAF RD & STRATFORD RD. MISCELLANEOUS IMPROVEMENTS / NEW CONSTRUCTION LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: G. BOWMAN ATLANTA SGN CT FOR MAINTENANCE OF PARK & LIGHTING 9-20-94
ATLANTA TIP # AT AR 196 CONG DIST. 5
0 FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY
ROW 1997
$ 1700
CONST 1997
$ 2376
FED SHARE $ 1901
GA. SHARE $
475
OTH SHARE $
FULTON 770274
STATUS:
CR 593/0LD BILL COOK RD S OF COLLEGE PRK @ KIMBERLY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .15/.24135 MANAGER: D. GODWIN REQ FULTON DO ROW, UTIL & DET 4/95;REQ CITY UTL 9/96.
ATLANTA TIP # FS 063 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY
ROW LOCL
CONST 1997
$
174
FED SHARE $
139
GA. SHARE $
35
OTH SHARE $
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 30
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
* -P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON ATLANTA MULTI-MODAL PASSENGER TERMINAL
ATLANTA TIP AR 120
PE 1994
UNDERWAY
770310 TRANSIT PROJECTS / NEW CONSTRUCTION
CONG DIST. 5
ROW 1997
$ 20000
LENGTH(Miles/km): .50/.80450- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1997
MANAGER: J. CHAMBERS
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE $ 84000
STATUS: ATLANTA SGN CT 20% PE 9-8-93; FUNDS:FHWA 31%,FTA 49% ATL 20%
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 21000
OTH SHARE $
FULTON 770388
STATUS:
ATMS: VARIABLE MSG SIGNS/ADVISORY RADIO ON "I" BEYOND I-285
* ATLANTA TIP AR 193
SIGNING / SAFETY
CONG DIST. 4 & 11
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 $
5
ROW NONE $
0
CONST 1997
$
800
FED SHARE $
640
GA. SHARE $ 160
OTH SHARE $
FULTON 770398
STATUS:
FULTON 770410
STATUS:
ATMS NON-FREEWAY ADVANCED TRAVELER INFORMATION SYSTEM
* ATLANTA TIP AR 098B2
MISCELLANEOUS IMPROVEMENTS / SAFETY
CONG DIST. 5 & 11
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: DEMONSTRATION PROGRAM
OTO WILL DO LGPA
FEDERAL HIGHWAY ADMIN FUNDS
ATMS ADVANCED VEHICLE IDENTIFICATION SYSTEM
* ATLANTA TIP AR 225
MISCELLANEOUS IMPROVEMENTS / SAFETY
CONG DIST. 6 & 4
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: DEMONSTRATION PROGRAM
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1997
$ 1000
FED SHARE $ 800
GA. SHARE $ 200
OTH SHARE $
PE NONE
$
0
ROW NONE $
0
CONST 1997
$
400
FED SHARE $ 320
GA. SHARE $
80
OTH SHARE $
FULTON ATMS: NON-FREEWAY COMMUNICATION FIBER OPTIC CABLE-FULTON
* ATLANTA TIP AR 226
PE NONE $
0
770420 MISCELLANEOUS IMPROVEMENTS / SAFETY
CONG DIST. 5
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
ROW NONE $
0
CONST 1997 $ 380
MANAGER: KARL ALFF
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE $ 304
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
76
OTH SHARE $
FULTON 770597
STATUS:
BICYCLE FACILITIES AT COMMUTER AREAS - 1998 FUNDS REMAINING BICYCLE/FED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED LANES: MANAGER: UNKNOWN NOT APPLICABLE
* ATLANTA TIP AR 177C
CONG DIST. 5
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 UNDERWAY
ROW NONE $
0
CONST 1998
$ 2746
FED SHARE $ 2197
GA. SHARE $
OTH SHARE $ 549
FULTON 770605
STATUS:
ATMS: TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN FULTON COUNTY
* ATLANTA TIP FN86/FS68
SIGNALS / SAFETY
CONG DIST. 5 & 6
LENGTH(Miles/km): 11.14/17.92426- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: CONG MIT./AIR QUAL
REQ FULTON DO ROW, UTIL, PE & 20% CONSTRUCTION 7-15-93
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1997 $ 460
FED SHARE $ 368
GA. SHARE $
OTH SHARE $
92
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 31
PROJECT LISTING BY RDC FY t997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR-O--JE-C-T---D-A-TA---------R--EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C-O--M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-ST--S--
FULTON ATMS: MOBILITY ENHANCEMENT PROGRAM ADDITIONAL 770639 SIGNALS / SAFETY
ATLANTA TIP # AR 176A CONG DIST. 5 & 4
PE 1997
$
11
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: CONG MIT./AIR QUAL
CONST 1997
$
743
FED SHARE $
594
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
OTH SHARE $
149
FULTON 770690
STATUS:
ATMS: NON-FREEWAY SURVEILLANCE SYSTEM IN FULTON COUNTY MISCELLANEOUS IMPROVEMENTS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED
MANAGER: KARL ALFF LGPA NOT APPLICABLE
LANES:
ATLANTA TIP # AR 190A CONG DIST. 5 & 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST 1997
$
481
FED SHARE $
385
GA. SHARE $
96
OTH SHARE $
FULTON 770870
STATUS:
OLD NATIONAL HWY FM FLAT SHOALS RD N TO SULLIVAN RD
ATLANTA TIP # FS AR 165A
SIDEWALKS / SAFETY
CONG DIST. 5 & 4
LENGTH(Miles/km): 1.70/2.73530 -EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
244
FED SHARE $ 195
GA. SHARE $
OTH SHARE $
49
FULTON 770873
STATUS:
ATMS: ARTERIAL ROUTES IN ATL-INSTALL COMM CABLE & HWD/DEKALB SIGNALS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: KARL ALFF NOT APPLICABLE
ATLANTA TIP # AR 201B CONG DIST. 5 & 4
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 1000
800 200
FULTON 770900
STATUS:
CS 3101/GRIMES BRIDGE ROAD @ BIG CREEK IN SOUTH ROSWELL REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .22/.35398 MANAGER: D. GODWIN FULTON HAS NO INVOLVED UTIL;ROSWELL SGN DO PE, U, ROW, 5/96
ATLANTA TIP # FN 095 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
53
AFTER 99
FULTON 770923
STATUS:
OLD ALABAMA FM RIVERSIDE DR TO MARKET BLVD
ATLANTA TIP # FN AR 177C
BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 1.20/1.93080 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. BOWMAN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
FULTON 770926
STATUS:
MEDLOCK BRIDGE FM PARSONS RD TO CHATTAHOOCHEE RIVER, PHASE 2
BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: D. GODWIN TO BE DONE BY CONTRACT
ATLANTA TIP # FN AR 177D CONG DIST. 6
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
332
FED SHARE $
266
GA. SHARE $
OTH SHARE $
66
PE.1996
UNDERWAY
ROW NONE
$
0
CONST 1997
$
282
FED SHARE $
226
GA. SHARE $
OTH SHARE $
56
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 32
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-ST--S--
FULTON MEDLOCK BRIDGE FM PARSONS RD TO CHATTAHOOCHEE RIVER, PHASE 1
ATLANTA TIP # FN AR 177A
PE 1996 UNDERWAY
770927 BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
ROW NONE $
0
CONST 1997
$
70
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE $
56
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
OTH SHARE $
14
FULTON 770932
STATUS:
CASCADE RD FM ATLANTA CL WEST TO DANFORTH RD
ATLANTA TIP # FS AR 177
SIDEWALKS / ENHANCEMENT
CONG DIST. 5
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1998
$
583
FED SHARE $ 466
GA. SHARE $
20
OTH SHARE $
97
FULTON 770933
STATUS:
HOLCOMB BR RD FM WEST OF BIG CK TOE OF SR 400(INCL BR'S)
ATLANTA TIP # FN AR 177B
SIDEWALKS / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 1.34/2.15606 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
385
FED SHARE $ 308
GA. SHARE $
OTH SHARE $
77
FULTON 770951
STATUS:
MARTA ADA PARATRANSIT/RAIL STATION MODIFICATIONS; PHASE 4
ATLANTA TIP # M AR 151B
TRANSIT PROJECTS / CAPITAL
CONG DIST. 5
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: LUKE COUSINS
FUND SOURCE: SURFACE TRANSPORT.
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE $
CONST 1997 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 4000 3200
800
FULTON 770952
STATUS:
MARTA ADA PARATRANSIT/RAIL STATION MODIFICATIONS; PHASE 5
ATLANTA TIP # M AR 151C
TRANSIT PROJECTS / CAPITAL
CONG DIST. 5
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: LUKE COUSINS
FUND SOURCE: SURFACE TRANSPORT.
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $
GA. SHARE $ OTH SHARE $
0 0 2080 1664
416
FULTON 770965
STATUS:
SIDEWALKS FOR TRANSIT @ FULTON INDUSTRIAL BLVD SIDEWALKS / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0
MANAGER: D. GODWIN TO BE DONE BY CONTRACT
/PROPOSED LANES:
ATLANTA TIP # FS AR 16SE CONG DIST. 5
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
579
FED SHARE $ 463
GA. SHARE $
OTH SHARE $ 116
FULTON 770967
STATUS:
SIDEWALKS FOR TRANSIT @ ABERNATHY RD & ROSWELL RD
ATLANTA TIP # FN AR 165A
SIDEWALKS / ENHANCEMENT
CONG DIST. 5
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997 $ 750
FED SHARE $ 600
GA. SHARE $
OTH SHARE $ 150
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
~-----'
~;;
_)
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
20-Sep-1996 Page 33
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON BICYCLE/PEDESTRIAN - PATH FOUNDATION OUTREACH MATERIALS/ ATL
ATLANTA TIP # AT AR 177D
PE NONE
$
0
770971 BICYCLE/FED. FACILITY / ENHANCEMENT
GONG DIST. 5
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1998 $
48
MANAGER: D. SCHNEIDER
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE $
38
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
OTH SHARE $
10
FULTON 770977
STATUS:
BICYCLING COURSES (REGIONAL)
ATLANTA TIP # AR 177B
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 5 & 4
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. SCHNEIDER
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
13
FED SHARE $
10
GA. SHARE $
OTH SHARE $
3
FULTON 770980
STATUS:
MARTA INTELLIGENT TRANSPORTATION SYSTEM (REGIONAL) TRANSIT PROJECTS / OPERATIONS LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: LUKE COUSINS NOT APPLICABLE
LANES:
ATLANTA TIP # M AR 197B CONG DIST. 5 & 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 2770 2216
554
FULTON 770985
STATUS:
ATMS: MOBILITY ENHANCEMENT PROGRAM ADDITIONAL SIGNALS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: KARL ALFF NOT APPLICABLE
/PROPOSED
LANES:
ATLANTA TIP # AR 176C CONG DIST. 5 & 4 0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST 1998
$
567
FED SHARE $
454
GA. SHARE $
OTH SHARE $
113
FULTON 770986
STATUS:
ATMS: MOBILITY ENHANCEMENT PROGRAM ADDITIONAL SIGNALS / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: KARL ALFF NOT APPLICABLE
/PROPOSED
LANES:
ATLANTA TIP # AR 176B CONG DIST. 5 & 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 1700 1360
340
FULTON 770988
STATUS:
AIR QUALITY ENHANCEMENT PROGRAM - 1997 FUNDING MISCELLANEOUS IMPROVEMENTS / PLANNING LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: D. SCHNEIDER NOT APPLICABLE
ATLANTA TIP # AR 203 CONG DIST. 5 & 4
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST 1997
$
750
FED SHARE $
600
GA. SHARE $
OTH SHARE $
150
FULTON 771010
STATUS:
ATLANTA REGIONAL RIDESHARE PROGRAM
ATLANTA TIP # AR 159
RIDE SHARING / OTHER
CONG DIST. 5 & 4
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 4000 4000
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 34
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON MARTA SERVICE EXPANSION - 1998 FUNDING
ATLANTA TIP i M AR 1600
PE NONE
$
0
771011 TRANSIT PROJECTS / CAPITAL
CONG DIST. 5 & 4
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1998
$
976
MANAGER:
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE $
781
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
OTH SHARE $ 195
FULTON 771012
STATUS:
MARTA EXPRESS BUS ROUTE FOR 1997
ATLANTA TIP i M AR 160C
TRANSIT PROJECTS / OPERATIONS
CONG DIST. 5 & 4
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE $
0
CONST 1997
$
685
FED SHARE $
548
GA. SHARE $
OTH SHARE $
137
FULTON 771021
STATUS:
ROSWELL TRAIL ALONG RIVERSIDE DRIVE & OLD RR @ SR 9
ATLANTA TIP i FN 098
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1998
$
500
FED SHARE $ 400
GA. SHARE $
OTH SHARE $ 100
FULTON 771030
STATUS:
MARTA INTELLIGENT TRANSPORTATION SYSTEM (REGIONAL) TRANSIT FACILITIES / CAPITAL LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: UNKNOWN NOT APPLICABLE
LANES:
ATLANTA TIP i M AR 197C CONG DIST. 5 & 4 0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 2770 2216
554
FULTON 771036
STATUS:
MARTA OPERATION ENHANCEMENT-SIGNAL PRIORITY SYSTEM (2 LOC) SIGNALS / CAPITAL LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: LUKE COUSINS NOT APPLICABLE
ATLANTA TIP # M AR 164B CONG DIST. 5 & 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1997
$
30
ROW NONE $
0
CONST 1997
$
400
FED SHARE $ 320
GA. SHARE $
OTH SHARE $
80
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 35
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA---------R--EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C-O--M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GWINNETT CAPITAL/PLANNING - LARGE BUSES, SMALL BUSES, COMM. EQUIPMENT
ATLANTA TIP # GW AR 201B
107147 TRANSIT PROJECTS / CAPITAL
CONG DIST. 4 & 10
FUNDS RECIPIENT: GWINNETT COUNTY
CAPITAL 1997
$ 3272
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
FED SHARE $ 2618
STATUS: SERVICES PROJECT
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $ 327
OTH SHARE $
327
GWINNETT TRANSIT OPERATING ASSISTANCE FOR FY 1997 1D7148 TRANSIT PROJECTS / OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
ATLANTA TIP # GW AR 200B CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1997
$
472
FED SHARE $ 228
GA. SHARE $
OTH SHARE $
244
GWINNETT CAPITAL - COMMUNICATIONS EQUIPMENT, 1D7149 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: PLANNING AND TECHNICAL ASSISTANCE
FARE COLLECTION EQUIP.,
ATLANTA TIP # GW AR 201C CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1071 857 107 107
GWINNETT TRANSIT OPERATING ASSISTANCE FOR FY 1998 1D7150 TRANSIT PROJECTS / OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH
STATUS:
ATLANTA TIP # GW AR 200C CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
472
FED SHARE $ 228
GA. SHARE $
OTH SHARE $
244
GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1V7017 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH STATUS:
ATLANTA TIP # GW AR 215B
CONG DIST. 4 & 10
CAPITAL 1997
$
75
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
60
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
OTH SHARE $
8
GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1V7022 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH
STATUS:
ATLANTA TIP # GW AR 215C
CONG DIST. 4 & 10
CAPITAL 1998
$
79
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
63
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
OTH SHARE $
8
GWINNETT I-85 FM S OF BOGGS RD TO N OF SUGARLOAF PKWY & CD & 11Y231
ATLANTA TIP # GW AR 072C
110231 INTERCHANGE / NEW CONSTRUCTION
CONG DIST. 6
LENGTH(Miles/km): 2.30/3.70070- EXIST. LANES: 8 /PROPOSED LANES: 12
MANAGER: J, GRAYBEAL
FUND SOURCE: I-STATE MAINT.
STATUS: CT REQ COUNTY DO PE, UTIL 2-6-96
FEDERAL HIGHWAY ADMIN FUNDS
11Y231 IS AN ASSOCIATED PROJECT.
PE NONE ROW 1997 CONST
$
0
$ 4620
AFTER 99
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
P.I.NO.
PROJECT DATA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
GWINNETT I-85 FM N OF SUGARLOAF TON OF OLD P'TREE & CD SYSTEM&11Y233
* ATLANTA TIP GW AR 072E
110233 INTERCHANGE / NEW CONSTRUCTION
CONG DIST. 6
LENGTH(Mi1es/km): 1.70/2.73530- EXIST. LANES: 8 /PROPOSED LANES: 12
MANAGER: J. GRAYBEAL
FUND SOURCE: I-STATE MAINT.
STATUS: CT REQ COUNTY DO PE, UTIL 2-6-96
FEDERAL HIGHWAY ADMIN FUNDS
11Y233 IS AN ASSOCIATED PROJECT.
GWINNETT I-985 @ SR 20 (SR 20 TO 3 LANES)
* ATLANTA TIP GW AR 069
110330 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 10
LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: B. FERGUSON
FUND SOURCE: NAT'L HIGHWAY
STATUS: GWINNETT SGN 12-18-92 FOR PUB UTIL; BUFORD REFUSED 2-13-92
FEDERAL HIGHWAY ADMIN FUNDS
GWINNETT I-85/SR 403 AT SR 316 INTERCHANGE
* ATLANTA TIP GW AR 053A
110530 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 4
LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 8 /PROPOSED LANES: 8
MANAGER: J. GRAYBEAL
FUND SOURCE: I-STATE MAINT.
STATUS: CT REQ COUNTY DO PE, UTIL 2-6-96
FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 36
FISCAL YEAR
COST ESTS
PE NONE ROW 1998 CONST
$
0
$ 4065
AFTER 99
PE 1993 ROW 1997 CONST
UNDERWAY $ 1919 AFTER 99
PE 1998 ROW 1998 CONST
$ 100 $ 5500 AFTER 99
GWINNETT I-85 FM BOGGS RD TO SUGARLOAF PKWY - TO SHOW NH FUNDS;110231 11Y231 INTERCHANGE / RECST. OR REHAB.
LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 8 /PROPOSED LANES: MANAGER: J. GRAYBEAL STATUS:
ATLANTA TIP # GW AR 0720 CONG DIST. 6 12 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
110231 IS AN ASSOCIATED PROJECT.
PE NONE ROW 1997 CONST
$
0
$ 380
AFTER 99
GWINNETT I-85 FM SUGARLOAF TO OLD PEACHTREE - FOR NH FUNDS;SEE 110233 11Y233 INTERCHANGE / RECST. OR REHAB.
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 8 /PROPOSED LANES: MANAGER: J. GRAYBEAL
STATUS:
ATLANTA TIP # GW AR 072F CONG DIST. 6 12 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 110233 IS AN ASSOCIATED PROJECT.
PE NONE ROW 1998 CONST
$
0
$ 500
AFTER 99
GWINNETT CLYDE WILLIAMS BLVD CONN FM RONALD REAGAN PKY TO SR 124&INTS 122720 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
LENGTH(Miles/km): 1.00/1.60900 MANAGER: J. GRAYBEAL STATUS: REQ GWINNETT COUNTY DO UTILITIES 8-26-94
GWINNETT SR 13/BUFORD HWY FM OLD PEACHTREE RD TO SUGARLOAF PKWY 132360 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1.30/2.09170 MANAGER: KEVIN HOSEY STATUS: REQ COUNTY DO UTILITIES, ROW & 20% CONSTRUCTION 1-22-93
* ATLANTA TIP GW 137
CONG DIST. 4
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWA.Y ROW 1997 $ 1800 CONST 1998 $ 15700
FED SHARE $ 12560 GA. SHARE $ 3140 OTH SHARE $
* ATLANTA TIP GW 099
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
20
AFTER 99
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
GWINNETT SUGARLOAF PKWY FROM LAKES PKWY (500' N OF SR 316) 132470 CONSTRUCTION OF NEW ROUTE WITH 6 LANES PROPOSED.
LENGTH(Miles/km): 1.12/1.80208 MANAGER: J. GRAYBEAL STATUS: CT REQ GWINNETT DO PE, ROW, UTILITIES 7-26-95
TO SR 120
ATLANTA TIP # GW 092 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 37
FISCAL YEAR
cOST ESTS
PE 1997 ROW LOCL CONST
$
5
AFTER 99
GWINNETT SR 324 AT SR 124
ATLANTA TIP # GW 131B
141805 INTERSECTION IMPROVEMENT / SAFETY
cONG DIST. 10
LENGTH(Miles/km): .60/.96540- EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: L. OWENS
FUND SOURCE: HWY. SAFETY
STATUS: GWINNETT SIGNED FOR PUBLIC UTILITIES 12-18-92; SEE #141800
FEDERAL HIGHWAY ADMIN FUNDS
GWINNETT KILLIAN HILL RD FM FIVE FORKS TRICKUM TO US 78 150270 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): .00/.00000 MANAGER: D. SMITH STATUS: CT REQ COUNTY DO PE, UTIL, ROW & 20% CST 4/22/96.
GWINNETT CR 235/ALCOVY ROAD @ ALCOVY RIVER 3 MI NE OF LAWRENCEVILLE 171210 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .19/.30571 MANAGER: L. OWENS STATUS: REQ GWINNETT COUNTY DO ROW, UTILITIES & DETOURS 9-26-95
ATLANTA TIP # GW 007B CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 150320 IS AN ASSOCIATED PROJECT.
ATLANTA TIP # GW 140 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
GWINNETT SR 13/BUFORD HWY FM DEKALB CO. LINE TO BEAVER RUIN ROAD
ATLANTA TIP # GW AR 177A
171260 SIDEWALKS / NEW CONSTRUCTION
CONG DIST. 4
LENGTH(Miles/km): 3.80/6.11420 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. OWENS
FUND SOURCE: CONG MIT./AIR QUAL
STATUS: CT SGN COUNTY DO PE, UTILITIES, ROW & 20% CONST. 4-10-96.
FEDERAL HIGHWAY ADMIN FUNDS
GWINNETT SR 141/P'TREE PKWY FM SPALDING DR TO CHATTAHOOCHEE RIVER
ATLANTA TIP # GW AR 177B
171330 BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. OWENS
FUND SOURCE: CONG MIT./AIR QUAL
STATUS: CT REQ COUNTY DOPE, UTIL, ROW & 20% CST 3-27-96.
FEDERAL HIGHWAY ADMIN FUNDS
GWINNETT SIDEWALKS ON BRECKINRIDGE RD AND SATELLITE BLVD 171340 SIDEWALKS /ENHANCEMENT
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: L. OWENS STATUS: CT REQ COUNTY DO PE, UTIL, ROW & 20% CST 4-1-96.
ATLANTA TIP # GW AR 177CD CONG DIST. 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1994
UNDERWAY
ROW 1997
$ 2620
CONST 1997
$ 1100
FED SHARE $
990
GA. SHARE $
110
OTH SHARE $
PE 1997 ROW LOCL CONST
$
20
AFTER 99
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
407
FED SHARE $
326
GA. SHARE $
81
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1997
$
430
FED SHARE $ 344
GA. SHARE $
OTH SHARE $
86
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
210
FED SHARE $ 168
GA. SHARE $
OTH SHARE $
42
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
126
FED SHARE $
101
GA. SHARE $
OTH SHARE $
25
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
GWINNETT SIDEWALKS ON PLEASANT HILL ROAD
171341 SIDEWALKS /ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED
MANAGER: L. OWENS STATUS: CT REQ COUNTY DO PE, UTIL, ROW & 20% CST 3-27-96.
LANES:
ATLANTA TIP # GW AR 177F
CONG DIST. 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
GWINNETT SHACKLEFORD ROAD & STEVE REYNOLDS BLVD
ATLANTA TIP # GW AR 177E
171342 SIDEWALKS / ENHANCEMENT
CONG DIST. 4
LENGTH(Miles/km): 1.47/2.36523 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. OWENS
FUND SOURCE: CONG MIT./AIR QUAL
STATUS: CT REQ COUNTY DO PE, UTIL, ROW & 20% CST 3-28-96.
FEDERAL HIGHWAY ADMIN FUNDS
GWINNETT CR 1959/CENTERVILLE-ROSEBUD RD @ BIG HAYNES CREEK 171350 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180
MANAGER: L. OWENS STATUS: GWINNETT SGN DO ROW, PUB UTL & DET 3-20-96, REF PVT UTIL.
ATLANTA TIP # GW 216 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 38
FISCAL YEAR
COST ESTS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1998
$
426
FED SHARE $
341
GA. SHARE $
OTH SHARE $
85
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
141
FED SHARE $ 112
GA. SHARE $
OTH SHARE $
29
PE 1997 ROW LOCL CONST
$
10
AFTER 99
GWINNETT SR 124 FM ROCKBRIDGE RD/DEKALB TO CENTERVILLE; SEE DEKALB 72153X UNKNOWN / UNKNOWN
ATLANTA TIP # GW 076A CONG DIST. 0 & 0
PE NONE $
0
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: NAT'L HIGHWAY
CONST NONE $
0
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
721530 IS AN ASSOCIATED PROJECT,
GWINNETT SPALDING DR FROM MT VERNON RD TO SR 140 @ INTER; SEE FULTON
ATLANTA TIP # FN 088
PE NONE $
0
74286X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): ,00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: UNKNOWN
FUND SOURCE: HWY. SAFETY
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
742860 IS AN ASSOCIATED PROJECT.
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96, (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997IFY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
20-Sep-1996 Page 39
FISCAL YEAR
COST ESTS
HENRY 3V7018
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN HENRY COUNTY
MANAGER: STEVE KISH
ATLANTA TIP # HE AR 102B
CONG DIST. 3 & 11
CAPITAL 1997
$
30
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
HENRY 3V7025
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: AGENCIES IN HENRY COUNTY
MANAGER: STEVE KISH
ATLANTA TIP # HE AR 102C
CONG DIST. 3 & 11
CAPITAL 1998
$
31
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
HENRY 311120
STATUS:
SR 20/SR 81 OVER I-75 BRIDGES I RECST. OR REHAB.
LENGTH(Mileslkm): .8111.30329
MANAGER: J. GRAYBEAL COUNTY SIGNED 11-14-85 FOR ROW AND UTILITIES.
ATLANTA TIP # HE 001A CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1987
UNDERWAY
ROW 1997
$ 1500
CONST 1998
$ 4274
FED SHARE $ 3847
GA. SHARE $
427
OTH SHARE $
HENRY 311840
STATUS:
I-75 @ JONESBORO RDICR 655
ATLANTA TIP # HE AR 209
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 3
LENGTH(Miles/km): .201.32180- EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: KEVIN HOSEY
FUND SOURCE: NAT'L HIGHWAY
REQ HENRY COUNTY DO UTILITIES 1-26-95
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW 1997
$ 1200
CONST 1998
$ 2964
FED SHARE $ 2371
GA. SHARE $
593
OTH SHARE $
HENRY 321145
STATUS:
N-S 1-WAY PAIR/MCDONOUGH FM N/RACETRACK RD TO N/CARMICAEL ST CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Mileslkm): 1.2011.93080 MANAGER: KEVIN HOSEY CITY OF McDONOUGH SGN FOR UTILITIES 8-30-95
ATLANTA TIP # HE 010 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 331980 IS AN ASSOCIATED PROJECT.
PE 1992
UNDERWAY
ROW 1997
$ 1406
CONST 1997
$
883
FED SHARE $
706
GA. SHARE $ 177
OTH SHARE $
HENRY 321530
STATUS:
E-W 1-WAY PAIR/MCDONOUGH ALONG SR 20/81 FM SOU RR TO ECL CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 1.80/2.89620 MANAGER: KEVIN HOSEY CITY OF MCDONOUGH & HENRY COUNTY SGN FOR ROW & UTIL 8-30-95
ATLANTA TIP # HE 008 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 331990 IS AN ASSOCIATED PROJECT.
PE 1995
UNDERWAY
ROW LOCL
CONST 1997
$ 1133
FED SHARE $
906
GA. SHARE $ 227
OTH SHARE $
HENRY 331360
STATUS:
CR 650IHAMPTON RD FM I-75 EAST TO SR 42 IN LOCUST GROVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .64/1.02976 MANAGER: M. GANNAWAY COUNTY SIGNED 8-6-85 FOR ROW & UTILITIES
ATLANTA TIP # HE 003 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996
UNDERWAY
ROW LOCL
CONST 1997
$ 1454
FED SHARE $ 1163
GA. SHARE $
291
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
HENRY 33152X
STATUS:
SR 155 NB 11.8-0.25 HENRY;SB UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000 MANAGER: GORDON BROWN
1.6-3.1/SEE SPALDING- 331520 - EXIST. LANES: 0 /PROPOSED LANES:
ATLANTA TIP # CU SPAL. CO CONG DIST. 0 & 0 0 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 331520 IS AN ASSOCIATED PROJECT.
HENRY 331550
STATUS:
SR 20 EB FM MP 14.41 TO 13.21; WB MP 13.28 TO 11.74 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.74/4.40866 MANAGER: GORDON BROWN REQ HENRY DO UTILITIES 4-22-96.
ATLANTA TIP # HE 011 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
HENRY 331980
STATUS:
SR 920/JONESBORO RD FM I-75 TO END 1-WAY PAIR IN MCDONOUGH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.20/5.14880
MANAGER: KEVIN HOSEY HENRY SGN 8-30-95 FOR UTIL, STRUCK THRU ROW REQUEST
ATLANTA TIP # HE 007A CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 321145 IS AN ASSOCIATED PROJECT.
HENRY 331990
STATUS:
SR 920/JONESBORO ROAD @ BIRCH CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. LENGTH(Mi1es/km): .25/.40225 MANAGER: KEVIN HOSEY REQ HENRY DO ROW, UTILITIES AND DETOURS 10-2-95
ATLANTA TIP # HE 007B CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 321530 IS AN ASSOCIATED PROJECT.
HENRY 371440
STATUS:
SCHOOL BICYCLE RACK PROGRAM FOR HENRY COUNTY
ATLANTA TIP # HEAR 177A
BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 3
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LEONI
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
HENRY 371442
STATUS:
BICYCLE/PEDESTRIAN SCHOOL SIGNAGE PROGRAM/1996
BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0
MANAGER: J. LEONI TO BE DONE BY CONTRACT
/PROPOSED
LANES:
ATLANTA TIP # HEAR 177B CONG DIST. 3
0 FUND.SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
HENRY 371444
STATUS:
BICYCLE/PEDESTRIAN SCHOOL BIKE RACK PROGRAM
ATLANTA TIP #HEAR 177C
BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 3
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LEONI
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 40
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE 1992 UNDERWAY
ROW 1997
$
380
CONST 1998
$ 1165
FED SHARE $
932
GA. SHARE $ 233
OTH SHARE $
PE 1995 UNDERWAY
ROW 1997 $ 4456 CONST 1998 $ 3696
FED SHARE $ 2957 GA. SHARE $ 739 OTH SHARE $
PE 1997
$
25
ROW NONE $
0
CONST 1998
$
477
FED SHARE $ 382
GA. SHARE $
95
OTH SHARE $
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
15
FED SHARE $
12
GA. SHARE $
OTH SHARE $
3
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
15
FED SHARE $
12
GA. SHARE $
OTH SHARE $
3
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
15
FED SHARE $
12
GA. SHARE $
OTH SHARE $
3
~~j
~L:Z..o.:.~
m'fu::~
~..:::_:r
L:L.~ ...:J
(.~----'
L.~- _j
L:__ :cJ
1.::~~
__ -~- :;;;
l~ . . _:)
. J
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 41
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
HENRY SR 138 FM WALT STEPHENS RD/CLAYTON TO I-75 ... SEE CLAYTON CO
ATLANTA TIP# CL 031
PE NONE
$
0
72148X UNKNOWN / UNKNOWN
CQNG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): ,00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: J. GARLAND
FUND SOURCE: NAT'L HIGHWAY
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
721480 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 42
PROJECT LISTING BY RDC FY 1997IFY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ROCKDALE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
ATLANTA TIP # RO AR 201B
7V7022 TRANSIT PROJECTS I CAPITAL
CONG DIST. 4
FUNDS RECIPIENT: AGENCIES IN ROCKDALE COUNTY
CAPITAL 1997
$
30
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
24
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
ROCKDALE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 7V7028 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN ROCKDALE COUNTY
MANAGER: STEVE KISH
STATUS:
ATLANTA TIP # RO AR 201C
CONG DIST. 4
CAPITAL 1998
$
31
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
ROCKDALE PARKER RD FM CULPEPPER TO OAKLAND; FOR ADDL RW $; SEE 712640
71Y640 BRIDGES I NEW CONSTRUCTION
LENGTH(Mileslkm): .001.00000 MANAGER: BILL MOSKAL
STATUS:
ATLANTA TIP # RO 015A CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 712640 IS AN ASSOCIATED PROJECT.
PE LOCL
ROW 19.97 CONST NONE
$ 2000
$
0
ROCKDALE SR 201138 FROM RELOCATED SR 138 TO I-20 721580 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Mileslkm): 1.6012.57440
MANAGER: D. CHURCH STATUS: CO SGN UTIL 10189; CONYERS SGN P UTIL 2191
ATLANTA TIP # RO 035 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1995 UNDERWAY
CONST 1998
$ 4282
FED SHARE $ 3426
GA. SHARE $ 856
OTH SHARE $
ROCKDALE SR 20 FM SOUTH OF HONEY CREEK RD TO RELOC SR 138 & SIDEWALKS 730903 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Mileslkm): 2.8814.63392 MANAGER: D. CHURCH STATUS: CO SGN CT FOR PE & UTIL 9-27-94; CONST OF SIDEWALKS 10-95
ATLANTA TIP # RO 018 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 73Y903 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1997 $ 5000
CONST 1998
$ 2600
FED SHARE $ 2080
GA. SHARE $ 420
OTH SHARE $ 100
ROCKDALE EXTEND BR CLVT ON SR 20 @ ALMOND BRANCH 730905 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
LENGTH{Mileslkm): .011.01609 MANAGER: D. CHURCH STATUS: ROCKDALE SGN CONTRACT FOR PE & UTILITIES 9-27-94
ATLANTA TIP # RO 044 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1991 UNDERWAY
ROW NONE
$
0
CONST 1998 $ 257
FED SHARE $ 206
GA. SHARE $
51
OTH SHARE $
ROCKDALE S~ 20 @ BIG HAYNES CREEK NEAR WALTON CO LINE 730950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH{Mileslkm): .201.32180 MANAGER: D. GODWIN STATUS: ROCKDALE SIGNED 10-27-92 FOR UTILITIES.
ATLANTA TIP # RO 042 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1995 UNDERWAY
ROW 1997
$
27
CONST 1998 $ 1091
FED SHARE $ 873
GA. SHARE $ 218
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 43
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA---------R--EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C-O--M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-ST--S--
ROCKDALE SR 138/SR 20 FROM NORTH OF I-20 TO SIGMAN ROAD
ATLANTA TIP # RO 013B
PE 1993 UNDERWAY
731047 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
CONG DIST. 4
ROW 1997
$ 5789
LENGTH(Mi1es/km): 1.70/2.73530
CONST 1998
$ 5245
MANAGER: D. CHURCH
FUND SOURCE: NAT'L HIGHWAY
FED SHARE $ 4196
STATUS: REQ CITY DO ROW/UTIL 9/92; CO SGN UTIL/REFUSED ROW 3-1-93
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1049
731048 IS AN ASSOCIATED PROJECT.
OTH SHARE $
ROCKDALE SR 138/SR 20 BRIDGE OVER I-20
731048 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .27/.43443 MANAGER: D. CHURCH
STATUS: REQ CITY DO ROW/UTIL 9/92; CO SGN UTIL/REFUSED ROW 3-1-93
ATLANTA TIP # RO 013C CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 731047 IS AN ASSOCIATED PROJECT.
PE NONE
$
ROW NONE
$
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 4040 3232
808
ROCKDALE STANTON RD/CR 434 FM HONEY CREEK RD TO EBENEZER RD 742820 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.55/4.10295 MANAGER: D. GODWIN STATUS: CT REQ CO DOPE, ROW, UTIL & ALL CST OVER $1,148,000
2-9-94
ATLANTA TIP # RO 024C CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW LOCL
CONST 1997
$ 2800
FED SHARE $ 1148
GA. SHARE $
OTH SHARE $ 1652
ROCKDALE CR 1/0GLESBY BRIDGE RD. @ SOUTH RIVER .5 MI E OF HENRY CO LI 742880 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .25/.40225
MANAGER: D. GODWIN STATUS: CT SGN ROCKDALE DO PE, ROW, UTIL & DETOURS 3-26-96.
ATLANTA TIP # RO 055 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
$
5
ROW LOCL
CONST 1998
$
501
FED SHARE $
401
GA. SHARE $
100
OTH SHARE $
ROCKDALE SIGMAN RD/CR 435 FM I-20 TO IRWIN BRIDGE RD/CR 442 752190 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.52/4.05468 MANAGER: D. CHURCH STATUS: CO SGN CT DOPE, ROW, UTIL & ALL CST OVER $4,177,000/6-28-94
ATLANTA TIP # RO 014A CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$ 5221
FED SHARE $ 4177
GA. SHARE $
OTH SHARE $ 1044
ROCKDALE EBENEZER RD/CR 434 FM STANTON RD/CR 434 TO SMYRNA RD/CR 438
752330 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.90/3.05710 MANAGER: D. GODWIN
STATUS: CT REQ CO DOPE, ROW, UTIL & ALL CST OVER $887,000 2-9-94
ATLANTA TIP # RO 024BRTP CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
$
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
5
1927 887
1040
ROCKDALE KLONDIKE RD/CR 437 FM SMYRNA RD/CR 438 TO JOHNSON SPUR 752390 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
LENGTH(Miles/km): .92/1.48028
MANAGER: BILL MOSKAL STATUS: ROCKDALE SGN CT DO PE,ROW,UTIL, ALL CST OVER 780,000 3-26-96
ATLANTA TIP # RO 017A CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW LOCL
CONST 1997
$ 3013
FED SHARE $ 780
GA. SHARE $
OTH SHARE $ 2233
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1997IFY 1999
Page 44
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--. I-.-N--O-. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ROCKDALE HURST ROAD AT HONEY CREEK
ATLANTA TIP i RO 049
PE 1996 UNDERWAY
752400 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 4
ROW LOCL
LENGTH(Mileslkm): .40/.64360 MANAGER: D. GODWIN STATUS: ROCKDALE SGN CT. PE/ROW/UTIL & CONST OVER $293,000 5-24-94
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONST 1997
$
674
FED SHARE $ 293
GA. SHARE $
OTH SHARE $
381
ROCKDALE ROCKBRIDGE RDICR 74 @ MAIN ST IN CONYERS 752420 INTERSECTION IMPROVEMENT I SAFETY
LENGTH(Miles/km): .38/.61142 - EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: D. GODWIN STATUS: CT SGN ROCKDALE PE/ROW/UTIL & CONST OVER $225,000 3-26-96.
ATLANTA TIP i RO 052 CONG DIST. 4 0 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
428
FED SHARE $ 225
GA. SHARE $
OTH SHARE $ 203
ROCKDALE SIDEWALKS ON MILSTEAD VILLAGE AND FLAT SHOALS RDS
ATLANTA TIP i ROAR 177AB
770934 SIDEWALKS I ENHANCEMENT
CONG DIST. 4
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT.IAIR QUAL
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
126
FED SHARE $ 101
GA. SHARE $
OTH SHARE $
25
ROCKDALE STANTON RD FM HONEY CREEK RD TO SR 138
ATLANTA TIP i ROAR 177D
770935 SIDEWALKS / ENHANCEMENT
CONG DIST. 4
LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT.IAIR QUAL
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1998
$
119
FED SHARE $
95
GA. SHARE $
OTH SHARE $
24
ROCKDALE SIDEWALKS ON UNDERWOOD ROAD
ATLANTA TIP i RO AR 177C
770937 SIDEWALKS / ENHANCEMENT
CONG DIST. 4
LENGTH(Miles/km): .001.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT.IAIR QUAL
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
26
FED SHARE $
21
GA. SHARE $
OTH SHARE $
5
ROCKDALE BIG HAYNES CREEK AREA MULTI-USE TRAIL
ATLANTA TIP i RO 056
770994 BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 4
LENGTH(Miles/km): 6.50/10.45850 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CRANFORD
FUND SOURCE: TRANS. ENHANCE.
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1997 $ 500
FED SHARE $
400
GA. SHARE $
OTH SHARE $
100
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
CENTRAL SAVANNAH RIVER REGIONAL DEVELOPMENT CENTER
Burke Columbia Emanuel Glascock Hancock Jefferson Jenkins Johnson Lincoln McDuffie Richmond Screven Taliaferro Warren Washington
Wilkes
"'(")
)>
r
"z' 0
;;::
r=
"'(/)
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 45
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
CENTRAL SAVANNAH RIVER
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BURKE SR 56 FM S. BURKE CL NORTH;PART NEW LOC;TO N OF BENNOCK MILL 22118Z RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 0 & 0
PE NONE
$
0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 MANAGER: UNKNOWN
CONST NONE
$
0
FUND SOURCE: SURFACE TRANSPORT.
STATUS: SIGNED BURKE 6/86 AND RICHMOND 8/7/90 FOR UTILITIES.
FEDERAL HIGHWAY ADMIN FUNDS
221180 IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
CENTRAL SAVANNAH RIVER
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
COLUMBIA I-20 REST AREA #62 & 63
210565 REST AREA / RECST. OR REHAB.
CONG DIST. 10
LENGTH(Mi1es/km): .30/.48270- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. GARLAND
FUND SOURCE: I-STATE MAINT.
STATUS: COLUMBIA COUNTY SIGNED 6-15-93 FOR UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
COLUMBIA SR 104 FM MP 8.95 S OF CR 515 TO MP 11.95 S OF CR 80 221805 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Mi1es/km): 3.00/4.82700 MANAGER: B. FERGUSON STATUS: COLUMBIA COUNTY SGN FOR UTILITIES 5-19-92
AUGUSTA TIP # CC 076-1(21) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBIA SR 28/FURYS FERRY RD FM RIVERWATCH PKWY/RICHMOND TO CR 98 221860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Mi1es/km): 2.88/4.63392 MANAGER: D. CHURCH STATUS: COLUMBIA SGN 3-17-92 UTIL; RICHMOND SGN 7-22-92 UTILITIES
COLUMBIA SR 47 NB MP 8.33-9.53;SB 13.48-15.18;NB 13.68-14.88 222140 ADDITION OF A PASSING LANE.
LENGTH(Mi1es/km): 4.18/6.72562 MANAGER: D. GRIFFITH STATUS:
AUGUSTA TIP # RCCC48-1(33) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 22186X IS AN ASSOCIATED PROJECT.
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 46
FISCAL YEAR
COST ESTS
PE NONE
$
ROW NONE $
CONST 1999 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 6820 6138
682
PE 1992 UNDERWAY
ROW 1998
$ 1337
CONST 1999
$ 6516
FED SHARE $ 5213
GA. SHARE $ 1303
OTH SHARE $
PE 1992 ROW 1998 CONST
UNDERWAY $ 2597 AFTER 99
PE 1998
ROW CONST
$
37
AFTER 99
AFTER 99
COLUMBIA CR 145 FM BASTON TO RIVERWATCH PK;BASTON FM SR 104 TO CR 145 250475 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
LENGTH(Mi1es/km): .57/.91713 MANAGER: D. CHURCH STATUS: COLUMBIA COUNTY SIGNED 3-3-92 FOR ROW AND UTILITIES.
COLUMBIA SR 104 FM CR 91/HALALI FARM RD TO E/CR 515 (INCL BRIDGES) 262080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Mi1es/km): 2.29/3.68461 MANAGER: B. FERGUSON STATUS: COLUMBIA COUNTY SIGNED FOR UTILITIES 11-19-91
AUGUSTA TIP # CC 7063(2) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
AUGUSTA TIP # CC 076-1(23) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1998 $ 3058
FED SHARE $ 2446
GA. SHARE $
612
OTH SHARE $
PE 1992 ROW 1998 CONST
UNDERWAY $ 1995 AFTER 99
COLUMBIA CR 136/BASTON RD FM CR 145 N TO SR 28/MARTINEZ 262410 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Mi1es/km): .27/.43443 MANAGER: D. CHURCH STATUS: COLUMBIA COUNTY SIGNED 3-3-92 FOR ROW AND UTILITIES.
AUGUSTA TIP # CC 7006(4) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1992
UNDERWAY
ROW LOCL
CONST 1998
$
661
FED SHARE $
529
GA. SHARE $ 132
OTH SHARE $
~:,__,
fi::,o'lc'.~~' '-:"}
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
CENTRAL SAVANNAH RIVER
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
COLUMBIA RESTORE HISTORIC HEADGATE BUILDING OF 271128 HISTORIC FACILITIES / ENHANCEMENT
LENGTH(Miles/km): .00/.00000- EXIST. MANAGER: CORA COOK STATUS: TO BE DONE BY CONTRACT
THE AUGUSTA CANAL LANES: 0 /PROPOSED
LANES:
AUGUSTA TIP # CC-OOOE(107) CONG DIST. 10 0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 47
FISCAL YEAR
COST ESTS
PE LOCL
ROW LOCL
CONST 1998 $ 754 FED SHARE $ 754 GA. SHARE $
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
CENTRAL SAVANNAH RIVER
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
EMANUEL 222210
STATUS:
SR 26/SWAINSBORO @ SOUTHERN RR/REMOVE BR & CONST GRADE XING
BRIDGE REMOVAL / NEW CONSTRUCTION LENGTH(Miles/km): .56/.90104- EXIST. LANES: 2 /PROPOSED LANES:
MANAGER: D. GRIFFITH SWAINSBORO SGN UTIL 8-7-95;EMANUEL NO INVOLVED UTILITIES.
CONG DIST. 1 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
EMANUEL 231145
STATUS:
SR 171 @ OHOOPEE RIVER AND OVERFLOW NE/SOPERTON & TREUTLEN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .10/.16090 MANAGER: D. GRIFFITH SEE BRS-578(4), TREUTLEN COUNTY, PI *231140
EMANUEL 231960
STATUS:
SR 56 (3) BRIDGES OVER OGEECHEE RVR & OVFL NE OF SUMMERTOWN REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .74/1.19066 MANAGER: D. GRIFFITH COUNTY SGN DO UTIL 7-15-96;BURKE NO UTILITIES 8-5-96.
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 23114X IS AN ASSOCIATED PROJECT.
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 48
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$ 1365
FED SHARE $ 1092
GA. SHARE $ 273
OTH SHARE $
PE 1995 UNDERWAY
ROW 1997
$
30
CONST 1998 $ 848
FED SHARE $
678
GA. SHARE $
170
OTH SHARE $
PE 1999 ROW CONST
$
86
AFTER 99
AFTER 99
EMANUEL 231970
STATUS:
SR 57 OVER SARDIS CREEK 9.7 MILES NW OF SWAINSBORO REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .23/.37007 MANAGER: D. GRIFFITH EMANUEL SGN DO UTILITIES 7/15/96.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1998 ROW CONST
$
11
AFTER-99
AFTER 99
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 49
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
CENTRAL SAVANNAH RIVER
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
HANCOCK SR 15 OVER COPELAND CREEK
PE 1993 UNDERWAY
231310 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
CONG DIST. 11
ROW 1996 UNDERWAY
LENGTH(Miles/km): .70/1.12630
CONST 1999
$
482
MANAGER: D. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 386
STATUS: NO REIMBURSABLE UTILITY COST ON THIS PROJECT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
96
OTH SHARE $
HANCOCK 231330
STATUS:
SR 15 OVER WHITTEN CREEK BRIDGES / RECST. OR REHAB.
LENGTH(Miles/km): .28/.45052 MANAGER: D. GRIFFITH HANCOCK REFUSED BUT THERE ARE NO UTILITIES INVOLVED
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1996 UNDERWAY
CONST 1999 $ 557
FED SHARE $
446
GA. SHARE $
111
OTH SHARE $
HANCOCK 270990
STATUS:
SHOULDERBONE INDIAN MOUND/HISTORICAL
RIGHTS-OF-WAY / ENHANCEMENT
CONG DIST. 11
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: C. VANDYKE
FUND SOURCE: TRANS. ENHANCE.
LGPA TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1997
$
800
CONST NONE
$
0
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 50
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
CENTRAL SAVANNAH RIVER
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
JEFFERSO SR 24/US 221 @ ROCKY COMFORT CREEK WEST SIDE OF LOUISVILLE
PE 1998
$
16
231980 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
CONG DIST. 11
ROW
AFTER 99
LENGTH(Miles/km): .31/.49879
CONST
AFTER 99
MANAGER: D. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
STATUS: JEFFERSON REF DO UTIL 7/12/96;LOUISVILLE SGN DO UTIL 7/15/96
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
CENTRAL SAVANNAH RIVER
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
JOHNSON 222190
STATUS:
SR 15 AT 3 LOC BTWN WRIGHTSVILLE & TENNILLE/& WASHINGTON ADDITION OF A PASSING LANE. LENGTH(Miles/km): 4.14/6.66126 MANAGER: D. GRIFFITH
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 22219X IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 51
FISCAL YEAR
COST ESTS
PE 1999 ROW CONST
$
60
AFTER 99
AFTER 99
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
20-Sep-1996 Page 52
COUNTY
DESCRIPTION
CENTRAL SAVANNAH RIVER
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
LINCOLN CR 262/WOODLAWN ROAD @ LLOYD CREEK 7 MI SW OF LINCOLNTON
PE 1994 UNDERWAY
242220 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 10
ROW LOCL
LENGTH(Miles/km): .20/.32180
CONST 1997
$
587
MANAGER: D. GRIFFITH STATUS: LINCOLN COUNTY SIGNED 11-2-93 FOR ROW, UTILITIES & DETOURS
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $
470
GA. SHARE $ 117
OTH SHARE $
LINCOLN 262450
STATUS:
CR 63/PETERSBURG RD FM SR 47 N TO SR 43 NEAR LINCOLNTON
RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. LENGTH(Miles/km): 1.80/2.89620 MANAGER: D. GRIFFITH LINCOLN SGN ROW, UTIL & DET 3/95;DOT AGREED TO PAY H20 7/96.
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY ROW LOCL CONST 1997 $ 1520
FED SHARE $ 1216 GA. SHARE $ 304 OTH SHARE $
LINCOLN 271122
STATUS:
LAMAR BLANCHARD HOUSE IN LINCOLNTON
HISTORIC ACQUISITION / ENHANCEMENT
CONG DIST. 10
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: C. VANDYKE
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW 1997 $
81
CONST NONE
$
0
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 53
PROJECT LISTING BY RDC FY 1997IFY 1999
COUNTY
DESCRIPTION
CENTRAL SAVANNAH RIVER
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND RICHMOND COUNTY
2D2016 TRANSIT PROJECTS I OPERATIONS
CONG DIST. 10 & 11
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS:
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1997
$
FED SHARE $
GA. SHARE $
1850 313
OTH SHARE $ 1537
RICHMOND CAPITAL MAINT., TOOLS & EQUIP., SOFTWARE, TIRE LEASE, ETC 2D2017 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:
CONG DIST. 10 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$ 165
FED SHARE $ 132
GA. SHARE $
17
OTH SHARE $
17
RICHMOND TRANSIT & ADA VEHICLES, CAP. MAINT., AND MISC. CAPITAL EQUIP 2D2018 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:
CONG DIST. 10 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1789 1431
179 179
RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND RICHMOND COUNTY 2D2019 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS:
CONG DIST. 10 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
2110 157
1953
RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND RICHMOND COUNTIES 2D2020 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT
MANAGER: STEVE KISH
STATUS:
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1999
$
FED SHARE $
GA. SHARE $
OTH SHARE $
2396 157
2239
RICHMOND ADMIN. VEHICLES, CAP . MAINT . , AND MISC. CAP. EQUIPMENT
2D2021 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT
MANAGER: STEVE KISH
STATUS:
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1999
$ 139
FED SHARE $
111
GA. SHARE $
14
OTH SHARE $
14
RICHMOND ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
2V7021 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA MPO AREA MANAGER: STEVE KISH STATUS:
CONG DIST. 10 & 11
CAPITAL 1997
$
50
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
40
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
5
OTH SHARE $
5
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 54
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
CENTRAL SAVANNAH RIVER
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
RICHMOND ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
2V7022 TRANSIT PROJECTS / CAPITAL
CONG DIST. 10 & 11
FUNDS RECIPIENT: AGENCIES IN RICHMOND MPO AREA
CAPITAL 1998
$
52
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
42
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
5
OTH SHARE $
5
RICHMOND ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 2V7023 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA MPO AREA MANAGER: STEVE KISH
STATUS:
CONG DIST. 10 & 11
CAPITAL 1999-
$
56
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
45
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
5
OTH SHARE $
6
RICHMOND I-20 @ SAVANNAH RIVER
210327 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .50/.80450 MANAGER: D. CHURCH
STATUS: LGPA NOT APPLICABLE
AUGUSTA TIP# RC 20-2(117) CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW NONE CONST
$
50
$
0
AFTER 99
RICHMOND I-520 FM NORTH OF I-20 TO SR 4/US 1--SLAB REPAIR & OVERLAY
AUGUSTA TIP # RC 520-1(11)
210360 RESURFACE & MAINTENANCE / MAINTENANCE
CONG DIST. 10 & 11
LENGTH(Miles/km): 5.99/9.63791 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: M. GANNAWAY
FUND SOURCE: I-STATE MAINT.
STATUS: LGPA NOT APPLICABLE THIS PROJECT
FEDERAL HIGHWAY ADMIN FUNDS
210430 IS AN ASSOCIATED PROJECT.
RICHMOND I-520 FM WRIGHTSBORO RD TO GORDON HWY--WIDENING TO 6 LANES 210430 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): 1.28/2.05952
MANAGER: M. GANNAWAY STATUS: RICHMOND SGN DO UTILITIES 4-16-96.
AUGUSTA TIP# RC 520-1(13) CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 210360 IS AN ASSOCIATED PROJECT.
RICHMOND I~520 FM NORTH OF I-20 TO WRIGHTSBORO RD WIDENING TO 6-LANES
210440 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 2.64/4.24776 MANAGER: M. GANNAWAY
STATUS: RICHMOND COUNTY SIGNED FOR UTILITIES 2-1-94.
AUGUSTA TIP # RC 520-1(14) CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 21Y440 IS AN ASSOCIATED PROJECT.
RICHMOND I-520 FM WHEELER RD NORTH TO I-20 & INTERCHANGE/21Y450 210450 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): .76/1.22284
MANAGER: M. GANNAWAY
STATUS:
AUGUSTA TIP# RC 520-1(15) CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 21Y450 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1993
UNDERWAY
ROW NONE $
0
CONST 1997
$ 3366
FED SHARE $ 3029
GA. SHARE $ 337
OTH SHARE $
PE 1994 UNDERWAY ROW 1996 UNDERWAY CONST 1997 $ 2246
FED SHARE $ 1797 GA. SHARE $ 449 OTH SHARE $
PE 1994 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$ 2417
FED SHARE $ 1934
GA. SHARE $ 483
OTH SHARE $
PE 1994 ROW 1999 CONST
UNDERWAY $ 1000 AFTER 99
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
CENTRAL SAVANNAH RIVER
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
RICHMOND I-20 FM I-520 TO THE SAVANNAH RIVER BRIDGE/21Y570 210570 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): 5.25/8.44725 MANAGER: D. CHURCH
STATUS:
AUGUSTA TIP # RC 20-2(145) CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 21Y570 IS AN ASSOCIATED PROJECT.
RICHMOND 210760
STATUS:
I-20 AUGUSTA WELCOME CENTER REST AREA j RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: J. GARLAND CO SGN FOR UTIL 2-6-96; INDUSTRY & TRADE TO FUND 20%.
LANES:
AUGUSTA TIP# RCI20-2(161) CONG DIST. 10 0 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
RICHMOND I-520 FM WRIGHTSBORO RD TO GORDON HWY- FOR IM; SEE 210430
AUGUSTA TIP # RC 520-1(13)
21Y430 UNKNOWN / RECST. OR REHAB.
CONG DIST. 10
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M. GANNAWAY
FUND SOURCE: I-STATE MAINT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
RICHMOND I-520 FM NORTH OF I-20 TO WRIGHTSBORO RD; FOR IM; SEE 210440
21Y440 UNKNOWN / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: M. GANNAWAY
STATUS:
AUGUSTA TIP# RC 520-1(14)
CONG DIST. 10 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 210440 IS AN ASSOCIATED PROJECT.
RICHMOND BQBBY JONES XWY FM LANEY WALKER BLVD TO SAVANNAH RIVER 220105 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
LENGTH(Miles/km): .89/1.43201 MANAGER: D. SMITH STATUS: HOLDING FOR SPECIAL FUNDS FOR CONSTRUCTION
AUGUSTA TIP# RC 117-1(13) CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
RICHMOND BOBBY JONES EXPRESSWAY BRIDGE OVER THE SAVANNAH RIVER TO SC
220107 BRIDGES / NEW CONSTRUCTION LENGTH(Miles/km): .00/.00000 MANAGER: D. SMITH
STATUS: LOCL SHARE IS SC; SC TO INITIATE BI-STATE AGRMT
AUGUSTA TIP# RC 117-1(14) CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
RICHMOND SR 4/15TH ST/AUGUSTA FM MILLEDGEVILLE RD TO GOVERNMENT ST 220680 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): .85/1.36765 MANAGER: BILL MOSKAL STATUS: CO SGN 12-6-88. DOT DO ALL ROW.
AUGUSTA TIP# RC 038-2(18) CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 55
FISCAL YEAR
COST ESTS
PE 1999 ROW NONE CONST
$ 842
$
0
AFTER 99
PE 1995 UNDERWAY
ROW 1997
$ 1572
CONST 1997
$ 7860
FED SHARE $ 6288
GA. SHARE $
OTH SHARE $ 1572
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 1061 955 106
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 3086 2777 309
PE 1995 UNDERWAY
ROW 1991 UNDERWAY
CONST 1999
$ 8275
FED SHARE $ 6620
GA. SHARE $ 1655
OTH SHARE $
PE 1995 UNDERWAY
ROW NONE
$
0
CONST 1999
$ 15570
FED SHARE $ 7785
GA. SHARE $
OTH SHARE $ 7785
PE 1992 UNDERWAY
ROW 1997
$
735
CONST 1999
$ 3263
FED SHARE $ 2610
GA. SHARE $
653
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
CENTRAL SAVANNAH RIVER
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
RICHMOND SR 10/GORDON HWY FM SR 223 TO W/FORT GORDON GATE #1/&CLVT 221532 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.50/5.63150 MANAGER: BILL MOSKAL STATUS: RICHMOND SIGNED FOR UTILITIES 4-7-92
AUGUSTA TIP # RC 004-3(35) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 56
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1994 UNDERWAY
CONST 1999
$ 5772
FED SHARE $ 4618
GA. SHARE $ 1154
OTH SHARE $
RICHMOND SR 4/DEANS BR RD FM S FT GORDON GATE 5 TO MP 20.75
AUGUSTA TIP # RC 043-1(49)
221550 TURN LANES / RECST. OR REHAB.
CONG DIST. 11 & 10
LENGTH(Miles/km): 6.29/10.12061 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: D. GRIFFITH
FUND SOURCE: NAT'L HIGHWAY
STATUS: RICHMOND SIGNED TO DO UTILITIES 12-20-94
FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1997
$
45
CONST 1998 $ 1519
FED SHARE $ 1215
GA. SHARE $ 304
OTH SHARE $
RICHMOND SR 28/FURYS FERRY RD FM RIVERWATCH PK TO CR 98/SEE COLUMBIA
AUGUSTA TIP # RCCC48-1(33)
PE NONE
$
0
22186X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: D. CHURCH
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
221860 IS AN ASSOCIATED PROJECT.
RICHMOND I-520/SR 415 @ SR 56 ADD WB LOOP
AUGUSTA TIP# RC 520-1(16)
222350 RAMP / NEW CONSTRUCTION
CONG DIST. 10 & 11
LENGTH(Miles/km): 1.69/2.71921- EXIST. LANES: 4 /PROPOSED LANES: 5
MANAGER: D. CHURCH
FUND SOURCE: I-STATE MAINT.
STATUS: RICHMOND COUNTY SIGNED FOR UTILITIES 12-15-92
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1997
$ 4200
CONST 1999 $ 6279
FED SHARE $ 5651
GA. SHARE $ 628
OTH SHARE $
RICHMOND TOBACCO RD @ SR 4/US 1 IN AUGUSTA
AUGUSTA TIP # RC 043-1(52)
222370 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 10 & 11
LENGTH(Miles/km): 1.36/2.18824 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: D. CHURCH
FUND SOURCE: NAT'L HIGHWAY
STATUS: RICHMOND SGN DO UTILITIES 3-5-96.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1997
$ 2010
CONST 1998 $ 4500
FED SHARE $ 3600
GA. SHARE $
900
OTH SHARE $
RICHMOND CSX RAILROAD AT OLIVE RD IN AUGUSTA
240809 BRIDGES / SAFETY LENGTH(Miles/km): .47/.75623 MANAGER: D. CHURCH
STATUS: CITY SGN 5/91 ROW/UTIL (CITY UTIL NEGLIGIBLE).
AUGUSTA TIP # RC 9104(001) CONG DIST. 11 & 10
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 24Y809 IS AN ASSOCIATED PROJECT.
PE 1991 UNDERWAY
ROW LOCL
CONST 1997
$ 3219
FED SHARE $ 2575
GA. SHARE $ 644
OTH SHARE $
RICHMOND SHOWN FOR "RR DEMO" MONEY ONLY ... SEE 240809 FOR PROJECT INFO
24Y809 UNKNOWN / SAFETY LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: D. CHURCH
STATUS: LGPA NOT APPLICABLE
AUGUSTA TIP# RC 9104(001) CONG DIST. 11 & 10 0 FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 240809 IS AN ASSOCIATED PROJECT.
PE NONE $
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
2306 2191
115
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 57
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
CENTRAL SAVANNAH RIVER
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
RICHMOND CR 200/WHEELESS RD @ ROCKY CREEK JUST S/MILLEDGEVILLE RD
AUGUSTA TIP # RC 7000(5)
PE 1994
UNDERWAY
250490 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 11 & 10
ROW LOCL
LENGTH(Miles/km): .15/.24135
MANAGER: D. GRIFFITH STATUS: RICHMOND SGN 4-7-92 ROW & UTIL.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONST 1998
$
806
FED SHARE $
645
GA. SHARE $
161
OTH SHARE $
RICHMOND WRIGHTSBORO RD/CR 1501 FM BELAIR RD TO BARTON CHAPEL RD 250510 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.63/4.23167 MANAGER: D. CHURCH
STATUS:
AUGUSTA TIP # RC 7001(9) CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW LOCL CONST
$
150
AFTER 99
RICHMOND NORTH LEG ROAD OVER CSX RAILROAD 250570 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): .00/.00000 MANAGER: D. CHURCH STATUS: RICHMOND SGN DO ROW, UTIL & DET 4-16-96.
AUGUSTA TIP # RC 7006(7) CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
15
AFTER 99
RICHMOND AUGUSTA CANAL MULTI-USE TRAIL/COLUMBIA
AUGUSTA TIP # RC-000-E(96)
271120 BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 10 & 11
LENGTH(Miles/km): 10.00/16.09000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: CORA COOK
FUND SOURCE: TRANS. ENHANCE.
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW LOCL
CONST 1997
$
625
FED SHARE $
500
GA. SHARE $
OTH SHARE $
125
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 58
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
CENTRAL SAVANNAH RIVER
FISCAL
COST
-P--.I-.-N-O--. ----------------P-R-O-JE-C--T--D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
SCREVEN SR 21 W/SYLVANIA @ OGEECHEE CREEK
PE 1992 UNDERWAY
221328 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
CONG DIST. 11
ROW NONE $
0
LENGTH(Miles/km): .03/.04827 MANAGER: K. FULBRIGHT
FUND SOUR'CE: BRIDGE PROGRAM
CONST 1998 $ 521
FED SHARE $
417
STATUS: COUNTY SIGNED 12/15/87 FOR UTILITIES ONLY
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 104
OTH SHARE $
SCREVEN 221329
STATUS:
SR 21 W/SYLVANIA @ HORSE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .03/.04827 MANAGER: K. FULBRIGHT COUNTY SIGNED 12/15/87 FOR UTILITIES ONLY; SEE 221328
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1998 $ 833
FED SHARE $
666
GA. SHARE $
167
OTH SHARE $
SCREVEN 53263X
STATUS:
S~ 73/US 301 N OF STATESBORO FM CR 445 TO SR 17/BULLOCH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.93/3.10537
MANAGER: K. FULBRIGHT
CONG DIST. 0 & 0
PE NONE
$
0
ROW NONE $
0
FUND SOURCE: NAT'L HIGHWAY
CONST NONE
$
0
FEDERAL HIGHWAY ADMIN FUNDS
532630 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
~
'-..c::~--.::---_;
C:';'~::..,_ 2"~
-.~:"':.~'::::-:::'
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1997/FY 1999
Page 59
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
CENTRAL SAVANNAH RIVER REGIONAL DEVELOPMENT COMMISSION
COMMENTS
FISCAL YEAR
COST ESTS
----------------------------------------------------------------------------------------------------------------------~------------
WARREN SR 16 OVER GOLDENS CREEK IN WARRENTON & TURN LANES (22Y390)
PE 1994 UNDERWAY
222390 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 11
ROW 1997
$
5
LENGTH(Miles/km): .62/.99758
CONST 1998 $ 520
MANAGER: D. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
416
STATUS: WARREN REFUSED P UTIL 8-4-96;WARRENTON REFUSED UTIL 10-27-95
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 104
22Y390 IS AN ASSOCIATED PROJECT.
OTH SHARE $
WARREN 22Y390
STATUS:
SR 16 OVER GOLDENS CREEK - 33E $ FOR TURN LANES - SEE 222390 BRIDGES / REPLACEMENT LENGTH(Miles/km): .00/.00000 MANAGER: UNKNOWN
PE NONE
$
0
CONG DIST. 11
ROW NONE $
0
CONST 1998
$
214
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 171
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
43
222390 IS AN ASSOCIATED PROJECT.
OTH SHARE $
WARREN 271124
STATUS:
CITY OF WARRENTON GYMNASIUM AUDITORIUM
HISTORIC PRESERVATION / ENHANCEMENT
CONG DIST. 11
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: C. VANDYKE
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1997
$
100
FED SHARE $
80
GA. SHARE $
OTH SHARE $
20
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 60
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
CENTRAL SAVANNAH RIVER
FISCAL
COST
-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
WASHINGT SR 15@ 3 LOC BTWN WRIGHTSVILLE & TENNILLE ... SEE JOHNSON CO
PE NONE $
0
22219X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE $
0
MANAGER: UNKNOWN
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
222190 IS AN ASSOCIATED PROJECT.
WASHINGT SR 24 BET SANDERS'LE & DAVISBORO EB MP 14.3-13.4;WB 5.3-7.0
231240 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.60/4.18340 MANAGER: D. GRIFFITH
STATUS:
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW CONST
$
45
AFTER 99
AFTER 99
WASHINGT SR 24 OVER WILLIAMSON SWAMP CREEK 1.3 MILES NW OF DAVISBORO
245140 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225 MANAGER: D. GRIFFITH
STATUS: WASHINGTON & DAVISBORO HAS NO INVOLVED UTILITIES.
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW CONST
$
14
AFTER 99
AFTER 99
WASHINGT JORDAN MILL RD ON NEW LOC FM TANLEY TO HOSPITAL RD & SR 24
250590 INTERSECTION IMPROVEMENT / RECST. OR REHAB.
CONG DIST. 11
LENGTH(Miles/km): .10/.16090- EXIST. LANES: 0 /PROPOSED LANES: 2
MANAGER: D. GRIFFITH
FUND SOURCE: SURFACE TRANSPORT.
STATUS: SANDERSVILLE SGN ROW, UTIL & OTHER 8/20/96;CO NO UTIL !NV.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
ROW LOCL CONST
$
15
AFTER 99
WASHINGT CITY OF TENNILLE RAILROAD DEPOT MUSEUM
271126 HISTORIC FACILITIES / ENHANCEMENT
CONG DIST. 11
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: C. VANDYKE
FUND SOURCE: TRANS. ENHANCE.
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW LOCL
CONST 1997
$
137
FED SHARE $
110
GA. SHARE $
OTH SHARE $
27
'f.
CHATTAHOOCHEE FLINT REGIONAL DEVELOPMENT CENTER
Carroll Coweta Heard Meriwether Troup
"C
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
20-Sep-1996 Page 61
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
CHATTAHOOCHEE-FLINT
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CARROLL 61091X
I-20 SAFETY IMPROVEMENTS FRM ALA STATE LINE TO SR 61/HARALSO
UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: I-STATE MAINT.
PE NONE
$
0
ROW NONE $
0
CONST NONE $
0
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
610910 IS AN ASSOCIATED PROJECT.
CARROLL 621970
STATUS:
SR 16/166 @ CR 521/BLANDENBURG RD IN CARROLLTON
INTERSECTION IMPROVEMENT / SAFETY
LENGTH(Miles/km): .54/.86886- EXIST. LANES: 4 /PROPOSED LANES:
MANAGER: GREG PARKER
CARROLLTON SGN FOR ROW AND UTILITIES 10-24-95
OTO
CONG DIST. 7 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 $
10
ROW LOCL
CONST 1999 $ 194
FED SHARE $ 194
GA. SHARE $
OTH SHARE $
CARROLL 631320
STATUS:
SR 16/US 27ALT FM SR 166 SE TO W OF STRIPLING CHAP RD/CR 24 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.65/2.65485 MANAGER: M. REYNOLDS CITY SGN PUBLIC UTIL 11-2-92; COUNTY HAS NO UTIL
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1999 CONST
UNDERWAY $ 1761 AFTER 99
CARROLL 641890
STATUS:
N CARROLLTON BYP/SR 166 CONN. FM SR 1 TO SR 166 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.90/4.66610 MANAGER: M. REYNOLDS
COUNTY REFUSED 3-2-94; CARROLLTON REFUSED 10-19-92
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1997 CONST
UNDERWAY
$ 2793 AFTER 99
CARROLL 642080
STATUS:
CR 834/SMITHFIELD ROAD @ INDIAN CREEK 4 MI NORTH OF BOWDON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225 MANAGER: GREG PARKER CARROLL SGN DO ROW, UTILITIES & DETOURS 11-6-95
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CARROLL 642085
STATUS:
CR 834/SMITHFIELD ROAD @ TURKEY CREEK 3.5 MI NORTH OF BOWDON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: GREG PARKER CARROLL SGN DO ROW, UTILITIES & DETOURS 11-6-95
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CARROLL 642090
STATUS:
CR 523/JONES MILL ROAD @ SNAKE CREEK 1.5 MI N OF WHITESBURG REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .31/.49879
MANAGER: GREG PARKER CARROLL SGN DO ROW, UTILITIES & DETOURS 11-6-95
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW LOCL
CONST 1999 $ 367
FED SHARE $ 294
GA. SHARE $
73
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1999
$
549
FED SHARE $ 439
GA. SHARE $ 110
OTH SHARE $
PE 19.96 UNDERWAY
ROW LOCL
CONST 1999
$
638
FED SHARE $ 510
GA. SHARE $ 128
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 62
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
CHATTAHOOCHEE-FLINT
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-ST--S--
CARROLL SR 8/US 78 AT CS 777
PE 1994 UNDERWAY
650480 TURN LANES / SAFETY
CONG DIST. 7
ROW LOCL
LENGTH(Miles/km): .60/.96540- EXIST. LANES: 2 /PROPOSED LANES: 3
CONST 1998 $ 265
MANAGER: GREG PARKER
FUND SOURCE: HWY. SAFETY
FED SHARE $ 239
STATUS: REVISED REQ VILLA RICA DO ROW & UTIL 2-17-94
OTO
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
27
OTH SHARE $
CARROLL 650570
STATUS:
CS 824/STEWART ST/CARROLLTON @ CURTIS CREEK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .32/.51488 MANAGER: GREG PARKER CARROLLTON PREV SGN 3-20-92 ROW & UTIL BUT REQ DELAY 6-9-92
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1991 UNDERWAY
ROW LOCL
CONST 1998 $ 333
FED SHARE $ 266
GA. SHARE $
67
OTH SHARE $
CARROLL 662500
STATUS:
CR 217/PLOWSHARE RD @ BUCK CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225 MANAGER: GREG PARKER CARROLL SGN ROW & UTIL 11/90;CARROLLTON NO INVOLVED UTIL.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL CONST 1998 $ 930
FED SHARE $ 744 GA. SHARE $ 186 OTH SHARE $
CARROLL 671020
STATUS:
CR 813/STATE LINE RD @ BIG INDIAN CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .30/.48270 MANAGER: GREG PARKER CARROLL SIGNED 12/22/89 FOR ROW, UTILITIES & DETOURS.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1990 UNDERWAY ROW LOCL CONST 1997 $ 622
FED SHARE $ 498 GA. SHARE $ 124 OTH SHARE $
CARROLL 671040
STATUS:
CR 394/HICKORY LEVEL-SAND HILL RD @ HOMINY CK SW/VILLA RICA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .37/.59533 MANAGER: GREG PARKER CARROLL SGN FOR ROW, UTILITIES & DETOURS 11-20-95
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
336
FED SHARE $ 269
GA. SHARE $
67
OTH SHARE $
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 63
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
CHATTAHOOCHEE-FLINT
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-ST-S---
COWETA I-85/SR 34 RAMP RECONSTRUCTION SOUTHEAST QUADRANT
PE 1996 UNDERWAY
311790 RAMP / RECST. OR REHAB.
CONG DIST. 3
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
ROW 1998 CONST
$ 3039 AFTER 99
MANAGER: M. REYNOLDS
FUND SOURCE: I-STATE MAINT.
STATUS: NEWNAN SGN UTILITIES 4-23-96;REQ COWETA DO P UTIL 5-2-96.
FEDERAL HIGHWAY ADMIN FUNDS
COWETA 331740
STATUS:
CR 301/SHADY GROVE CH. RD @WAHOO CREEK 5,8 MI NW OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COWETA 332170
STATUS:
SR 14/US 29 AT SR 154
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 3
LENGTH(Miles/km): .32/.51488- EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
CO REF ROW & UTIL 2-21-96.
OTO
FEDERAL HIGHWAY ADMIN FUNDS
COWETA 332180
STATUS:
SR 16 AT SR 54 INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): ,25/.40225- EXIST, LANES: 2 /PROPOSED LANES: MANAGER: GORDON BROWN COWETA SGN UTIL, SIGNALS & PART ROW 3\95;TURIN NO INV UTIL
CONG DIST. 3 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
COWETA 342900
STATUS:
CR 251/WAGERS MILL ROAD@ WAHOO CREEK 7.6 MI NW OF NEWNAN
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COWETA 342945
STATUS:
CR 549/WELCOME ROAD @ MOUNTAIN CREEK 3.1 MI NW OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .25/.40225 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COWETA 342950
STATUS:
CR 555/W. GRANTVILLE ROAD @ NEW RIVER 3 MI N OF JCT SR 14 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225
MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 342955 IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1995 UNDERWAY
ROW LOCL
CONST 1997
$
311
FED SHARE $ 249
GA. SHARE $
62
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
190
FED SHARE $
171
GA. SHARE $
19
OTH SHARE $
PE 1997
$
5
ROW LOCL
CONST 1997
$
135
FED SHARE $
135
GA. SHARE $
OTH SHARE $
PE 1995 UNDERWAY
ROW LOCL
CONST 1997
$
390
FED SHARE $ 312
GA . .SHARE $
78
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1997
$
158
FED SHARE $ 126
GA. SHARE $
32
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1997
$
233
FED SHARE $
186
GA. SHARE $
47
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 64
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
CHATTAHOOCHEE-FLINT
FISCAL
COST
-P--. I-.-N--O-. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COWETA CR 555/W. GRANTVILLE ROAD @ GOLDEN CK 4.9 MI N OF JCT SR 14
PE 1996 UNDERWAY
342955 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 3
ROW LOCL
LENGTH(Miles/km): .25/.40225
CONST 1997 $ 232
MANAGER: J. LEONI STATUS: COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 186
GA. SHARE $
46
342950 IS AN ASSOCIATED PROJECT.
OTH SHARE $
COWETA 342960
STATUS:
CR 317/HENRY BRYANT ROAD @ WAHOO CREEK 3.5 MI NW OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY ROW LOCL CONST 1997 $ 559
FED SHARE $ 447 GA. SHARE $ 112 OTH SHARE $
COWETA 350980
STATUS:
SR 34 AT FIVE EXISTING MEDIAN OPENINGS
TURN LANES / SAFETY
CONG DIST. 3
LENGTH(Miles/km): .50/.80450- EXIST. LANES: 4 /PROPOSED LANES: 5
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
NEWNAN SGN DO UTIL 3-22-94;COWETA NO INVOLVED UTILITIES.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1998 $ 330
FED SHARE $ 297
GA. SHARE $
33
OTH SHARE $
COWETA 370781
STATUS:
CR 157/ROCKAWAY RD IN SENOIA @ CSX RR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .27/.43443 MANAGER: GORDON BROWN CITY OF SENOIA SIGNED 1-31-90 FOR ROW, UTIL & DETOURS.
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1997 $ 1212 FED SHARE $ 970
GA. SHARE $ 242 OTH SHARE $
COWETA 370824
STATUS:
CR 74/STALLINGS ROAD @ KEG CREEK TRIB. 1 MI N OF SENOIA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .19/.30571 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 370826 IS AN ASSOCIATED PROJECT.
PE 1995 UNDERWAY
ROW LOCL
CONST 1997 $ 244
FED SHARE $ 195
GA. SHARE $
49
OTH SHARE $
COWETA 370826
STATUS:
CR 74/STALLINGS ROAD @ KEG CREEK 1.5 MI N OF SENOIA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND .SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 370824 IS AN ASSOCIATED PROJECT.
PE 1995 UNDERWAY
ROW LOCL
CONST 1997 $ 267
FED SHARE $ 214
GA. SHARE $
53
OTH SHARE $
COWETA 371302
STATUS:
CR 82/GOODWYN ROAD @ WHITE OAK CREEK 3 MI E OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .22/.35398 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY
ROW LOCL
CONST 1997 $ 364
FED SHARE $ 291
GA. SHARE $
73
OTH SHARE $
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P. I . NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
CHATTAHOOCHEE-FLINT
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
COWETA 371306
STATUS:
CR 21/HAPPY VALLEY ROAD @ BROWNS CREEK 6 MI N OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Mi1es/km): .20/.32180 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COWETA 371308
STATUS:
CR 239/BOHANNON ROAD @ NEW RIVER 1 MI N OF GRANTVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COWETA 371330
STATUS:
CR 252/SMOKEY RD OVER MOUNTAIN CREEK SW OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225
MANAGER: J. LEONI COWETA SGN 8-2-94 FOR PE, ROW, UTILITIES & DETOURS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 65
FISCAL YEAR
COST ESTS
PE 1995 UNDERWAY
ROW LOCL
CONST 1997
$
202
FED SHARE $ 162
GA. SHARE $
40
OTH SHARE $
PE 1995 UNDERWAY
ROW LOCL
CONST 1997 $ 301
FED SHARE $ 241
GA. SHARE $
60
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
366
FED SHARE $
293
GA. SHARE $
73
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 66
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
CHATTAHOOCHEE-FLINT
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
TROUP SR 1 @ UNNAMED TRIBUTARY TO WEST POINT LAKE
PE 1992 UNDERWAY
321720 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
CONG DIST. 7
ROW NONE $
0
LENGTH(Miles/km): .30/.48270
CONST 1999
$
920
MANAGER: M. GANNAWAY STATUS: COUNTY SIGNED 11-17-87 FOR UTILITIES
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 736 GA. SHARE $ 184
OTH SHARE $
TROUP 322250
STATUS:
SR 1/US 27/LAGRANGE FM AUBURN ST TO SR 219/MORGAN ST RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH{Miles/km): 1.42/2.28478 MANAGER: J. GARLAND LAGRANGE SGN UTILITIES 3-4-92;TROUP NO INVOLVED UTLITIES.
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1998 CONST
UNDERWAY $ 10608 AFTER 99
TROUP 350990
STATUS:
SOUTH LOOP FROM FLING RD SE TO PEGASUS PARKWAY IN LAGRANGE CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
LENGTH{Miles/km): 3.25/5.22925 MANAGER: J. GARLAND TROUP SGN FOR RUO 9-13-96;REQ LAGRANGE DO RUD 7-12-96.
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
45
AFTER 99
TROUP 351170
STATUS:
SR 14/US 29 LEFT TURN LANE FROM MEADOW WAY DR TO SR 14 SPUR
TURN LANES / SAFETY
CONG DIST. 7
LENGTH{Miles/km): .63/1.01367 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1999 ROW LOCL CONST
$
24
AFTER 99
COASTAL GEORGIA REGIONAL DEVELOPMENT CENTER
Bryan Bulloch Camden Chatham Effingham Glynn Liberty
Long Mcintosh
Iirl&~
STEWART MILITARY RESERVATION
U.S.A
T PULASKI NATIONAL MONUMENT WAY ISLAND
"'-'-=~-~ Sound
WASSAW NATIONAL WILDLIFE REFUGE
WASSAW ISLAND
Harrietts Bluft
ST. CATHERINE$ ISLAND ~~.r--\1----+ HARRIS NECK NATIONAL
WILDLIFE REFUGE
BLACKBEARD ISLAND NATIONAL WILDLIFE REFUGE BLACKBEARD ISLAND
WILDERNESS AREA
SAPELO ISLAND NAT'L. ESTUARINE SANCTUARY
Doboy Sound
WOLF ISLAND NATIONAL WILDLIFE REFUGE
AND WILDERNESS AREA
LITTLE SAINT SIMONS ISLAND NATIONAL MONUMENT
ISLAND
JEKYLL ISLAND PARK
CUMBERLAND ISLAND
r'IIAADtDI Alun ,,.., ... , ...
COASTAL GEORGIA
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 67
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BRYAN
I-95 FM JERICO RVR TO US 17 ... SEE LIBERTY CO- 511150
PE NONE
$
0
51115X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: UNKNOWN
FUND SOURCE: NAT'L HIGHWAY
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
511150 IS AN ASSOCIATED PROJECT.
BRYAN 511190
STATUS:
I-16 WIDEN 10 BRIDGES @ MP 138.3; 145.9; 146.6; 146.8; 147.2 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): 10.00/16.09000 MANAGER: KEVIN HOSEY REQ BRYAN DO UTILITIES 10-5-93
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 51119X IS AN ASSOCIATED PROJECT.
PE 1994 UNDERWAY
ROW NOl-JE $
0
CONST 1999
$ 6150
FED SHARE $ 5535
GA. SHARE $ 615
OTH SHARE $
BRYAN 511325
STATUS:
I-95 FOG DETECTION SYS IN BYRAN,CHATHAM,EFFINGHAM;511325,X;Z
MISCELLANEOUS IMPROVEMENTS / NEW CONSTRUCTION
CONG DIST. 1
LENGTH(Miles/km): 8.30/13.35470 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: I-STATE MAINT.
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
51132X IS AN ASSOCIATED PROJECT.
PE 1997 $ ROW NONE $ CONST 1997 $
FED SHARE $ GA. SHARE $ OTH SHARE $
50 0
1500 1350
150
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 68
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BULLOCH SR 67 FM CR 248/585 NORTH TO 5-LN SECTION
PE 1992 UNDERWAY
521270 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 1
ROW 1997
$
150
LENGTH(Miles/km): 1.40/2.25260
CONST 1999 $ 1675
MANAGER: TONY COLLINS STATUS: STATESBORO SGN 6-4-91 & COUNTY SGN 6-5-91 FOR UTILITIES
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
FED -SHARE $ 1340 GA. SHARE $ 335
OTH SHARE $
BULLOCH 521275
STATUS:
SR 67 @ LITTLE LOTTS CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS BULLOCH COUNTY SIGNED 6/14/90 FOR UTILITIES.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1999
$
718
FED SHARE $ 574
GA. SHARE $
144
OTH SHARE $
BULLOCH 521800
STATUS:
SR 73/US 301 FM PACKING HOUSE RD TO NORTH OF CR 445 & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.45/7.16005
MANAGER: RAY METTS REQ BULLOCH DO UTILITIES 6-6-96.
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1998
CONST
UNDERWAY $ 3386 AFTER 99
BULLOCH 521970
STATUS:
SR 26/STATESBORO FM BRANNEN RD/CS 802 TO SR 67/73/US 301 RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES.
LENGTH(Miles/km): 1.87/3.00883 MANAGER: RAY METTS CO SGN PUB UTIL 12-17-91;STATESBORO DO UTILITIES 12-2-91
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1998 CONST
UNDERWAY
$ 404 AFTER 99
BULLOCH 522470
STATUS:
SR 26/US 80 EB MP 7.1-8.2; WB MP 8.1-9.3 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.30/3.70070 MANAGER: TONY COLLINS BULLOCH SGN/UTILITIES 12-17-91;PORTAL SGN 12-5-91 PUB UTILS
BULLOCH 522640
STATUS:
E. STATESBORO BYP FM SR 73/US 25 TO SR 73/US 301 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 6.85/11.02165
MANAGER: RAY METTS
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1997
$
93
CONST 1998
$
453
FED SHARE $
362
GA. SHARE $
91
OTH SHARE $
PE 1999 ROW CONST
$
110
AFTER 99
AFTER 99
BULLOCH 532630
STATUS:
SR 73/US 301 N OF STATESBORO FM CR 445 TO SR 17/SCREVEN RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 5.75/9.25175 MANAGER: K. FULBRIGHT
CONG DIST. 1 & 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 53263X IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1998 ROW CONST
$ 250 AFTER 99 AFTER 99
~
t'l":__: __ :
l!f::C"
(~~-~-:-.:-'::.:j
\:=;>:"'''- -~- "i
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 69
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BULLOCH CR 927 OVER LUKE SWAMP BRANCH
PE 1994 UNDERWAY
541950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
CONG DIST. 1
ROW LOCL
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS STATUS: REQ BULLOCH DO ROW, UTIL & DETOURS 5/21/96.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONST 1998
$
331
FED SHARE $
265
GA. SHARE $
66
OTH SHARE $
BULLOCH 542040
STATUS:
CR 927 @ MANN BRANCH 9 MI S OF BROOKLET REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS REQ BULLOCH COUNTY DO ROW, UTIL & DET 5-6-96.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
$
10
ROW LOCL
CONST 1999
$
514
FED SHARE $
411
GA. SHARE $
103
OTH SHARE $
BULLOCH 550500
STATUS:
BRANNEN ST/CS 802 FM GENTILLY RD/CS 673 TO SR 26 -STATESBORO RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): .55/.88495 MANAGER: TONY COLLINS STATESBORO SGN 4-1-91 ROW AND UTILITITES
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. . FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1992 UNDERWAY
ROW LOCL
CONST 1997
$
935
FED SHARE $
748
GA. SHARE $
187
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997IFY 1999
COASTAL
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CAMDEN 511080
STATUS:
I-95 FM HARRIETT'S BLUFF RD TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Mileslkm): 6.72110.81248 MANAGER: J. GRAYBEAL CAMDEN COUNTY SGN 2-4-92 FOR UTILITIES
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y080 IS AN ASSOCIATED PROJECT.
CAMDEN 511086
STATUS:
I-95 OVER WHITE OAK CREEK & 51Y086 FOR IM $ BRIDGES I RECST. OR REHAB. LENGTH(Mileslkm): .181.28962 MANAGER: J, GRAYBEAL CAMDEN SGN 3-24-92 - UTILITIES SEE 511082
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y086 IS AN ASSOCIATED PROJECT.
CAMDEN 511087
STATUS:
I-95 OVER SATILLA RIVER; & 51Y086 FOR IM $ BRIDGES I RECST. OR REHAB.
LENGTH(Mileslkm): .291.46661
MANAGER: J. GRAYBEAL CAMDEN SGN 3-24-92 - UTILITIES; SEE 511082
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y086 IS AN ASSOCIATED PROJECT.
CAMDEN 51Y080
STATUS:
I-95 FM HARRIETT'S BLUFF RD TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Mileslkm): .001.00000 MANAGER: J. GRAYBEAL CAMDEN COUNTY SGN 2-4-92 FOR UTILITIES
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511080 IS AN ASSOCIATED PROJECT.
CAMDEN 51Y086
STATUS:
I-95 OVER WHITE OAK & SATILLA CKS FOR IM $; SEE 511086,087 BRIDGES I RECST. OR REHAB. LENGTH(Mileslkm): .001.00000
MANAGER: J. GRAYBEAL
CAMDEN SGN 3-24-92 - UTILITIES SEE 511082
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511086 IS AN ASSOCIATED PROJECT.
CAMDEN 521910
STATUS:
SR 40 FM KINGS BAY RD SE TO 5 LANE SECTION @ SR 40 SPUR RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
LENGTH(Mileslkm): 3,3015.30970
MANAGER: B. FERGUSON CT REQ COUNTY & ST. MARYS DO PE, ROW, UTIL & CST UP TO $1 M
CONG DIST. 1
FUND .SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CAMDEN 522690
STATUS:
SR 25IUS 17 BRIDGE OVER ST. MARY'S RIVER IFLA STATE LINE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Mileslkm): .001.00000 MANAGER: M. REYNOLDS BI-STATE AGRMT SGN 11I92;CO REFUSED 10I93;DOT TO PAY 11194
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 70
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1998 $ 23454
FED SHARE $ 18763
GA. SHARE $ 4691
OTH SHARE $
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1999 $ 4985
FED SHARE $ 3988
GA. SHARE $ 997
OTH SHARE $
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1999 $ 7073
FED SHARE $ 5658
GA. SHARE $ 1415
OTH SHARE $
PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 3000 2700 300
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1999 $ 4000
FED SHARE $ 3600
GA. SHARE $ 400
OTH SHARE $
PE 1993 UNDERWAY ROW 1997 $ 2000 CONST 1999 $ 2500
FED SHARE $ 1500 GA. SHARE $
OTH SHARE $ 1000
PE 1994 UNDERWAY
ROW 1998 $
5
CONST 1999 $ 3050
FED SHARE $ 2440
GA. SHARE $ 610
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
COASTAL
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CAMDEN 570810
STATUS:
CS 535/N RIVER CAUSEWAY FM POINT PETER RD TO NAVAL BASE
MINOR WIDEN & RESURF / RECST. OR REHAB.
CONG DIST. 1
LENGTH(Mi1es/km): 2.10/3.37890 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: TONY COLLINS
FUND SOURCE: UNKNOWN
COUNTY SGN CT ACQUIRE ROW 8-19-94;ST MARYS SGN ROW 7-24-94
FEDERAL HIGHWAY ADMIN FUNDS
CAMDEN 571040
STATUS:
KINGSLAND DOWNTOWN 6 BLOCK AREA AND LANDSCAPE SIDEWALKS / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: STAN HAMES LGPA TO BE DONE BY CONTRACT
/PROPOSED LANES:
CONG DIST. 1 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 71
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1997
$
10
CONST 1999
$ 2700
FED SHARE $ 2700
GA. SHARE $
OTH SHARE $
PE LOCL
ROW NONE
$
0
CONST 1997
$
365
FED SHARE $ 292
GA. SHARE $
OTH SHARE $
73
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 72
PROJECT LISTING BY ROC FY 1997IFY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
C-HP-A-.IT-.H-NA-OM--. -T-R--A-N-S-IT---O-P-E-R-A-T-PINR-G-O-JE-AC-ST-S-IS-DT-AA-TNA-C-E---FO--R--FY-R-E-G1-9IO-9N-7A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
5D5017 TRANSIT PROJECTS I OPERATIONS
CONG DIST. 1 & 11
FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY
OPERATING 1997
$ 5001
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
FED SHARE $
690
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $ 4311
CHATHAM 505018
STATUS:
CAPITAL - CAPITAL MAINTENANCE ITEMS, TOOLS & EQUIPMENT,
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY
MANAGER: STEVE KISH
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
2229 1783
223 223
CHATHAM 505019
STATUS:
FACILITY IMPROVEMENT, CAPITAL MAINTENANCE ITEMS, SERVICE & TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH SUPPORT VEHICLES
CONG DIST. 1 & 11
CAPITAL 1997
$ 502
FUND SOURCE: NON FEDERAL TRANSIT
FED SHARE $
GA. SHARE $ 251 OTH SHARE $ 251
CHATHAM 5D5020
STATUS:
CAPITAL - FACILITY IMPROVEMENT & MODIFICATION, OFFICE EQUIP. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH
CONG DIST. 1 & 11
CAPITAL 1998
$ 286
FUND SOURCE: NON FEDERAL TRANSIT
FED SHARE $ 143
GA. SHARE $
OTH SHARE $ 143
CHATHAM 505022
STATUS:
CAPITAL - CAPITAL MAINTENANCE ITEMS, OFFICE EQUIPMENT AND
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY
MANAGER: STEVE KISH
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
2229 1783
223
223
CHATHAM 5D5023
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1998
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
5200 690
4510
CHATHAM 505024
STATUS:
CAPITAL - CAPITAL MAINTENANCE ITEMS, OFFICE EQUIP. & FURNIT. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH PARATRANSIT VEHICLES
CONG DIST. 1 & 11
FUND SOURCE; URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
CAPITAL 1999
$
FED SHARE $
GA. SHARE $
OTH SHARE $
2229 1783
223 223
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
COASTAL
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
20-Sep-1996 Page 73
FISCAL YEAR
COST ESTS
CHATHAM 5D5025
STATUS:
DOWNTOWN TRANSFER CENTER TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY
MANAGER: STEVE KISH
CONG DIST. 1 & 11
CAPITAL 1998
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
11250 9000 1125 1125
CHATHAM 5D5026
STATUS:
CAPITAL - REPLACE FARE COLLECTION SYSTEM, SERVICE/SUPPORT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH
VEHICLES
CONG DIST. 1 & 11
CAPITAL 1999
$ 735
FUND SOURCE: NON FEDERAL TRANSIT
FED SHARE $
GA. SHARE $ 368
OTH SHARE $ 368
CHATHAM 5D5027
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1999 TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT AUTHORITY MANAGER: STEVE KISH
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1999
$
FED SHARE $
GA. SHARE $
OTH SHARE $
5200 690
4510
CHATHAM 5V7005
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH
CONG DIST. 1 & 11
CAPITAL 1997
$ 100
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
80
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
10
OTH SHARE $
10
CHATHAM 5V7017
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH
CONG DIST. 1 & 11
CAPITAL 1998
$ 105
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
84
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
11
OTH SHARE $
11
CHATHAM 5V7019
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH
CONG DIST. 1 & 11
CAPITAL 1999
$ 110
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
88
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
11
OTH SHARE $
11
CHATHAM 511060
STATUS:
I-95 @ CR 984/JIMMY DELOACH PKWY & 51Y060 FOR STP $
SAVANNAH TIP ~ 91-H-08
INTERCHANGE / NEW CONSTRUCTION
CONG DIST. 1
LENGTH(Miles/km): 1.07/1.72163- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CHURCH
FUND SOURCE: NAT'L HIGHWAY
CHATHAM COUNTY SIGNED FOR ROW & UTILITIES 5-14-93
FEDERAL HIGHWAY ADMIN FUNDS
51Y060 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1992 UNDERWAY
ROW LOCL
CONST 1997
$ 8305
FED SHARE $ 6644
GA. SHARE $ 1661
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
20-Sep-1996 Page 74
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-ST-S---
CHATHAM 51132X
I-95 FOG DETECTION SYS IN BYRAN,CHATHAM,EFFINGHAM;511325,X;Z
MISCELLANEOUS IMPROVEMENTS / NEW CONSTRUCTION
CONG DIST. 0 & 0
LENGTH(Mi1es/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: I-STATE MAINT.
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
511325 IS AN ASSOCIATED PROJECT.
CHATHAM 51Y060
STATUS:
I-95 @ CR 984/JIMMY DELOACH PKWY -FOR STP $; SEE 511060
SAVANNAH TIP # 91-H-08
INTERCHANGE / NEW CONSTRUCTION
CONG DIST. 1
LENGTH(Mi1es/km): 1.07/1.72163- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CHURCH
FUND SOURCE: SURFACE TRANSPORT.
SEE 511060
FEDERAL HIGHWAY ADMIN FUNDS
511060 IS AN ASSOCIATED PROJECT.
PE NONE $
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
1000 BOO 200
CHATHAM 521495
STATUS:
SR 204/ABERCORN ST @ VETERANS PKY (SOUTHWEST BYP)
SAVANNAH TIP # 93-H-05
INTERCHANGE / NEW CONSTRUCTION
CONG DIST. 1
LENGTH(Miles/km): 1.14/1.83426 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS
FUND SOURCE: SURFACE TRANSPORT.
CHATHAM COUNTY SGN FOR ROW & UTILITIES 4-24-92.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW LOCL
CONST 1998
$ 9202
FED SHARE $ 7362
GA. SHARE $ 1840
OTH SHARE $
CHATHAM 521505
STATUS:
HARRY S.TRUMAN PKY/PH IV FM WHITFIELD AVE TO MONTGOMERY X-RD CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 1.90/3.05710
MANAGER: G. ROSS CHATHAM SGN CT TO DO PE, ROW AND UTILITIES 6-15-95
SAVANNAH TIP # 87-H-10 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1997
$ 10082
FED SHARE $ 8066
GA. SHARE $ 2016
OTH SHARE $
CHATHAM 521508
STATUS:
HARRY S.TRUMAN PKY/PH III FM MONTGOMERY X-RD TO DERENNE AVE CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 2.20/3.53980 MANAGER: G. ROSS CHATHAM SGN CT TO DO PE, ROW & UTILITIES 6-15-95
SAVANNAH TIP # 87-H-09 CONG DIST. 1 & 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1997 $ 22540 FED SHARE $ 18032 GA. SHARE $ 4508 OTH SHARE $
CHATHAM 521770
STATUS:
SR 26 FM BRYANWOOD RD TO W/BULL RIV INCLD BIKE LANE & BRIDGE
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.90/3.05710
MANAGER: G. ROSS COUNTY SGN UTIL & PAY 20% MATCHING FUNDS BIKE PATH 6-26-92.
SAVANNAH TIP # 87-H-34 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 52Y770 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1997
$
200
CONST 1998 $ 8600
FED SHARE $ 6880
GA. SHARE $ 1720
OTH SHARE $
CHATHAM 521780
STATUS:
SR 26/GARDEN CITY FM CR 704 TO SR 25/US 17;INCL CLVT EXT TURN LANES / RECST. OR REHAB. LENGTH(Miles/km): .46/.74014- EXIST. LANES: 4 /PROPOSED LANES:
MANAGER: D. SMITH GARDEN CITY SGN UTILITIES 1-25-93;CHATHAM NO INVOLVED UTIL.
SAVANNAH TIP # 90-H-08 CONG DIST. 1
5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1992 UNDERWAY
ROW 1995 UNDERWAY
CONST 1997
$ 1604
FED SHARE $ 1283
GA. SHARE $ 321
OTH SHARE $
1::!
\:...;:-
\'!.. ~--- --J
_.)
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 75
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
-P--.I-.N--O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHATHAM SR 26 FM 4-LN E/LYNES PKWY TO VICTORY DR/CS 188
SAVANNAH TIP # 87-H-18B
PE 1993 UNDERWAY
521855 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 11
ROW LOCL
LENGTH(Miles/krn): 1.38/2.22042
CONST 1997 $ 7090
MANAGER: G. ROSS
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 3545
STATUS: CHATHAM SGN DO ROW, UTIL & 50% CST COST 11-30-90.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
OTH SHARE $ 3545
CHATHAM 521860
STATUS:
SR 25 FM 4-LN N/SR 204 NE TO SR 307(INCL PARALLEL BRIDGE) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): 3.69/5.93721 MANAGER: G. ROSS
CHATHAM CO SGN FOR ROW & UTILITIES 10-16-90
SAVANNAH TIP # 87-H-34 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1997
$ 6049
FED SHARE $ 4839
GA. SHARE $ 1210
OTH SHARE $
CHATHAM 521865
STATUS:
SR 25/US 17 FM OGEECHEE RVR OFLW TO S/SR 204(& NEW BR) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): 2.40/3.86160 MANAGER: G. ROSS CHATHAM COUNTY SIGNED 11/9/90 FOR ROW AND UTILITIES.
SAVANNAH TIP # 90-H-07 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1999
$ 6310
FED SHARE $ 5048
GA. SHARE $ 1262
OTH SHARE $
CHATHAM 521867
STATUS:
SR 25/US 17/0CEAN HWY @ OGEECHEE RIVER OVERFLOW REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): .05/.08045
MANAGER: G. ROSS CHATHAM COUNTY SIGNED 11/9/90 FOR ROW AND UTILITIES
SAVANNAH TIP # 93-H-11 CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1999 $ 1455 FED SHARE $ 1164 GA. SHARE $ 291 OTH SHARE $
CHATHAM SR 17/US 80 FM SR 17 TO CHERRY ST IN BLOOMINGDALE/EFFINGHAM
SAVANNAH TIP # 96-H-5
PE NONE
$
0
52217X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE $
0
LENGTH(Miles/krn): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: UNKNOWN
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
522170 IS AN ASSOCIATED PROJECT.
CHATHAM 522490
STATUS:
SR 26/US80 FM W OF BULL RIVER TO E OF LAZARETTO CRK/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): 5.77/9.28393 MANAGER: G. ROSS CHATHAM SGN FOR UTILITIES 11-17-95
SAVANNAH TIP # 93-H-03 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY
ROW 1997
$
559
CONST 19-98 $ 35345
FED SHARE $ 28276
GA. SHARE $ 7069
OTH SHARE $
CHATHAM 522610
STATUS:
SR 25/HOULIHAN BRIDGE OVER THE SAVANNAH RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/krn): .30/.48270 MANAGER: D. CHURCH NOT APPLICABLE
SAVANNAH TIP # 90-H-06 CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1999
$ 7517
FED SHARE $ 6014
GA. SHARE $ 1503
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 76
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHATHAM SR 30 AT SR 21 AND SR 25 IN PORT WENTWORTH
SAVANNAH TIP # 92-H-05
PE 1995 UNDERWAY
522670 STATUS:
INTERSECTION IMPROVEMENT / RECST. OR REHAB.
CONG DIST. 1
LENGTH(Miles/km): .94/1.51246 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: TONY COLLINS
FUND SOURCE: SURFACE TRANSPORT.
CHATHAM SGN FOR UTILITIES 11-17-95
FEDERAL HIGHWAY ADMIN FUNDS
ROW 1997
$
60
CONST 1998 $ 546
FED SHARE $
437
GA. SHARE $ 109
OTH SHARE $
CHATHAM 522800
STATUS:
SR 30 RELOC FM EAST OF SR 21 TO HOULIHAN BRIDGE/SR 25 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
LENGTH(Miles/km): 1.50/2.41350 MANAGER: D. CHURCH COUNTY SIGNED CONTRACT FOR PE, ROW & UTILITIES ON 11-18-94.
SAVANNAH TIP # 96-H-3 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW LOCL CONST
$
5
AFTER 99
CHATHAM 52Y770
STATUS:
SR 26 FM BRYANWOOD RD TO BULL RIV (SHOWN FOR BIKE FUNDS 33B)
SAVANNAH TIP # 87-H-34
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 1
LENGTH(Miles/km): 1.94/3.12146 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: G. ROSS
FUND SOURCE: TRANS. ENHANCE.
FEDERAL HIGHWAY ADMIN FUNDS
521770 IS AN ASSOCIATED PROJECT.
CHATHAM 531260
STATUS:
SR 204 EB FM MP 2.0-3.2;WB MP 3.7-4.7 SE OF MELDRIM ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.40/3.86160 MANAGER: TONY COLLINS CHATHAM SGN 10-11-91 FOR UTILITIES.
SAVANNAH TIP # 92-H-07 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 532510
STATUS:
SR 204/ABERCORN ST. @ EISHENHOWER IN SAVANNAH
SAVANNAH TIP # 93-H-06
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 1
LENGTH(Miles/km): .30/.48270- EXIST. LANES: 7 /PROPOSED LANES: 8
MANAGER: TONY COLLINS
FUND SOURCE: HWY. SAFETY
SAVANNAH SGN FOR UTILITIES 4-12-93;CHATHAM NO INVOLVED UTIL
FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 532570
STATUS:
ABERCORN ST @ TIBET AVE INTERSECTION IMPROVEMENT / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 6 /PROPOSED LANES:
MANAGER: G. ROSS COUNTY SGN CONTRACT FOR PE, ROW & UTILITIES 6-27-94
SAVANNAH TIP # 93-H-12 CONG DIST. 1 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 532750
STATUS:
SR 204/ABERCORN ST. @ EGRESS LN/OGLETHORPE MALL IN SAVANNAH
TURN LANES / SAFETY LENGTH(Miles/km): .31/.49879 - EXIST. LANES: 6 /PROPOSED LANES: MANAGER: TONY COLLINS
TO BE DONE BY CONTRACT
SAVANNAH TIP # 97-H-01 CONG DIST. 1 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1998
$
250
FED SHARE $
200
GA. SHARE $
OTH SHARE $
50
PE 1992 UNDERWAY
ROW 1996 UNDERWAY
CONST 1998
$
739
FED SHARE $ 591
GA. SHARE $
148
OTH SHARE $
PE NONE $
0
ROW 1996 UNDERWAY
CONST 1997
$
303
FED SHARE $ 273
GA. SHARE $
30
OTH SHARE $
PE 1996 UNDERWAY ROW LOCL
CONST 1998 $ 1270 FED SHARE $ 1016 GA. SHARE $ 254 OTH SHARE $
PE 1999 ROW LOCL CONST
$
5
AFTER 99
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 77
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHATHAM SR 204/ABERCORN ST. @ DERENNE AVE IN SAVANNAH
SAVANNAH TIP # 97-H-02
PE 1999
$
5
532760 TURN LANES / SAFETY
CONG DIST. 1 & 11
ROW LOCL
LENGTH(Miles/km): .07/.11263- EXIST. LANES: 5 /PROPOSED LANES: 5
CONST
AFTER 99
MANAGER: TONY COLLINS
FUND SOURCE: HWY. SAFETY
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 532770
STATUS:
SR 204/ABERCORN ST. @ APACHE AVE IN SAVANNAH
SAVANNAH TIP # 97-H-03
TURN LANES / SAFETY
CONG DIST. 1
LENGTH(Miles/km): .47/.75623- EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: TONY COLLINS
FUND SOURCE: HWY. SAFETY
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW LOCL CONST
$
5
AFTER 99
CHATHAM 532780
STATUS:
SR 204/ABERCORN ST. @ LARGO DRIVE IN SAVANNAH
TURN LANES / SAFETY LENGTH(Miles/km): .41/.65969 -EXIST. LANES: 6 MANAGER: TONY COLLINS TO BE DONE BY CONTRACT
/PROPOSED
LANES:
SAVANNAH TIP # 97-H-04 CONG DIST. 1 6 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW LOCL CONST
$
5
AFTER 99
CHATHAM 550570
STATUS:
MIDDLEGROUND & MONTGOMERY CROSS RDS FM ABERCORN TO ABRCRN EX RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.80/4.50520 MANAGER: G. ROSS COUNTY SGN CONTRACT FOR PE, ROW & UTILITIES 6-27-94
SAVANNAH TIP # 94-H-22 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 550580
STATUS:
WHITE/COFFEE BLUFF RDS FM N OF LITTLE OGEECHEE RVR TO WILLOW RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.10/3.37890
MANAGER: G. ROSS CHATHAM SGN CONTRACT FOR PE, ROW & UTILITIES 6-15-95
SAVANNAH TIP # 94-H-23 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 550590
STATUS:
POOLER PARKWAY EXTENSION FM QUACCO RD TO US 80 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 4.18/6.72562 MANAGER: D. CHURCH CT SGN COUNTY DO PE, UTIL & ROW 5/24/96.
SAVANNAH TIP # 90-H-06 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 570860
STATUS:
EXT. OF R. MCCORKLE SR BIKEWAY ON WILMINGTON ISLAND
SAVANNAH TIP # 93-H-08
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 1
LENGTH(Miles/km): 1.34/2.15606 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: CHRIS SIMONS
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$ 3900
FED SHARE $ 3120
GA. SHARE $
780
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1999
$ 4760
FED SHARE $ 3808
GA. SHARE $
952
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$ 11699
FED SHARE $ 9359
GA. SHARE $ 2340
OTH SHARE $
PE LOCL
ROW LOCL
CONST 1997
$
110
FED SHARE $
88
GA. SHARE $
OTH SHARE $
22
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 78
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHATHAM SKIDAWAY RD FM FERGUSON AVE TO S OF VICTORY DR IN SAVANNAH
SAVANNAH TIP # 94-H-11
PE 1996 UNDERWAY
571060 INTERSECTION IMPROVEMENT / RECST. OR REHAB.
CONG DIST. 1 & 11
ROW LOCL
LENGTH(Miles/km): 4.10/6.59690 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST 1999 $ 7335
MANAGER: BILL MOSKAL STATUS: CHATHAM SGN CONTRACT FOR PE, ROW & UTILITIES 11-18-94
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 5868 GA. SHARE $ 1467
OTH SHARE $
CHATHAM 571211
STATUS:
BOAT RAMPS/LANDSCAPING IN SAVANNAH
SAVANNAH TIP # 97-H-6
LANDSCAPING / ENHANCEMENT
CONG DIST. 1
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1998
$
630
FED SHARE $ 504
GA. SHARE $
OTH SHARE $ 126
CHATHAM 571212
STATUS:
RESTORATION OF TYBEE ISLAND LIGHTHOUSE
SAVANNAH TIP # 97-H-5
HISTORIC PRESERVATION / ENHANCEMENT
CONG DIST. 1
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1998
$
350
FED SHARE $ 250
GA. SHARE $
OTH SHARE $ 100
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
COASTAL
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
EFFINGHA I-16 WIDEN 10 BRIDGES @ MP 138.3; 145.9; 146.6; 147.2/BRYAN
51119X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/krn): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: I-STATE MAINT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
511190 IS AN ASSOCIATED PROJECT.
EFFINGHA I-95 FOG DETECTION SYS IN BYRAN,CHATHAM,EFFINGHAM;511325,X;Z 51132Z MISCELLANEOUS IMPROVEMENTS / NEW CONSTRUCTION
LENGTH(Miles/krn): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: KARL ALFF
STATUS: NOT APPLICABLE
CONG DIST. 0 & 0 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511325 IS AN ASSOCIATED PROJECT.
EFFINGHA SR 17&26/US 80 FM SR 17 TO CHERRY ST IN BLOOMINGDALE/CHATHAM
522170 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): .79/1.27111 MANAGER: M. REYNOLDS
STATUS: EFFINGHAM SGN 9/92;CHATHAM SGN 7/92 AND WILL PAY CITY UTIL.
SAVANNAH TIP # 87-H-30 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 52217X IS AN ASSOCIATED PROJECT.
EFFINGHA CR 307 @ EBENEZER CREEK NW OF CR 72 532390 BRIDGES / REPLACEMENT
LENGTH(Miles/krn): .11/.17699 MANAGER: TONY COLLINS STATUS: EFFINGHAM COUNTY SGN DO ROW, UTILITIES & DETOURS 4-7-92
CONG DIST. 1 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 79
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE 1993 UNDERWAY
ROW 1997
$
896
CONST 1998
$ 1434
FED SHARE $ 1147
GA. SHARE $ 287
OTH SHARE $
PE 1993 UNDERWAY
ROW LOCL
CONST 1997 $ 140
FED SHARE $ 112
GA. SHARE $
28
OTH SHARE $
COUNTY P. I. NO.
DESCRIPTION PROJECT DATA
GLYNN 5D8001
STATUS:
OPERATIONAL PLANNING TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GLYNN COUNTY
MANAGER: STEVE KISH
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997IFY 1999
COASTAL
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CONG DIST. 1
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
20-Sep-1996 Page 80
FISCAL YEAR
COST ESTS
CAPITAL 1997
$
20
FED SHARE $
16
GA. SHARE $
2
OTH SHARE $
2
GLYNN 5D8002
STATUS:
PURCHASE VEHICLES AND MISC. CAPITAL EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GLYNN COUNTY
MANAGER: STEVE KISH
CONG DIST. 1
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$ 385
FED SHARE $ 308
GA. SHARE $
39
OTH SHARE $
39
GLYNN 5D8003
STATUS:
PUBLIC TRANSIT SERVICE FOR BRUNSWICK AND GLYNN COUNTY
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: GLYNN COUNTY MANAGER: STEVE KISH
CONG DIST. 1
OPERATING 1998 $
87
FUND SOURCE: URBAN TRANSIT
FED SHARE $
44
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
44
GLYNN 5D8004
STATUS:
PUBLIC TRANSIT SERVICE FOR BRUNSWICK AND GLYNN COUNTY TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GLYNN COUNTY
MANAGER: STEVE KISH
CONG DIST. 1
CAPITAL 1999
$
87
FUND SOURCE: URBAN TRANSIT
FED SHARE $
44
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
44
GLYNN 5D8006
STATUS:
TRANSIT VEHICLES, FACILITY LEASE, CAP. MAINT., ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GLYNN COUNTY
MANAGER: STEVE KISH
CONG DIST. 1
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1999
$ 220
FED SHARE $ 176
GA. SHARE $
22
OTH SHARE $
22
GLYNN 5V7016
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN GLYNN COUNTY
MANAGER: STEVE KISH
CONG DIST. 1
CAPITAL 1997
$
50
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
40
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
5
OTH SHARE $
5
GLYNN 5V7018
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN GLYNN MPO AREA
MANAGER: STEVE KISH
CONG DIST. 1
CAPITAL 1998
$
52
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
42
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
5
OTH SHARE $
5
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 81
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GLYNN ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
5V7020 TRANSIT PROJECTS / CAPITAL
CONG DIST. 1
FUNDS RECIPIENT: AGENCIES IN GLYNN MPO AREA
CAPITAL 1999
$
55
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
44
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
6
OTH ;mARE $
6
GLYNN 511245
STATUS:
I-95 @ RA 105 NEW BUILDING, PARKING AND SEWER -- PHASE II REST AREA / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: J. GARLAND NOT APPLICABLE
BRUNSWICK TIP # BATS96-03 CONG DIST. 1 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997 $ 2998 FED SHARE $ 2698 GA. SHARE $ 300 OTH SHARE $
GLYNN 520890
STATUS:
SR 25/BRUNSWICK FM S OF TORRAS CAUSEWAY N TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 1.88/3.02492
MANAGER: G. BOWMAN BRUNSWICK SIGNED 2/22/89 UTILITIES
BRUNSWICK TIP # BATS93-05 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. . FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW 1995 UNDERWAY CONST 1998 $ 4260
FED SHARE $ 3408 GA. SHARE $ 852 OTH SHARE $
GLYNN 522042
STATUS:
SR 25/BRUNSWICK REMOVAL OF OLD SIDNEY LANIER BRIDGE BRIDGE REMOVAL / REPLACEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 4 /PROPOSED LANES:
MANAGER: J. GRAYBEAL OTHER SHARE IS COAST GUARD
BRUNSWICK TIP # BATS96-05 CONG DIST. 1 4
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 3820 1910
1910
GLYNN 522310
STATUS:
SR 27/US 341 @ I-95 FM W/CRISPEN BLVD TO W/YELLOW BLUFF CK RECONSTRUCTION & WIDENING FROM 5 LANES TO 6 LANES. LENGTH(Miles/km): .87/1.39983 MANAGER: BILL MOSKAL
BRUNSWICK REF DO UTIL 8/7/96;GLYNN REF DO UTILITIES 8/26/93
BRUNSWICK TIP # BATS93-02 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1997
$ 4803
FED SHARE $ 3842
GA. SHARE $ 961
OTH SHARE $
GLYNN 522730
STATUS:
SR 25 @ CS 427/TALMADGE AVE & SR 25C/GLOUCESTER ST/BRUNSWICK
INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .36/.57924- EXIST. LANES: 4 /PROPOSED LANES: MANAGER: TONY COLLINS REQ CITY DO ROW & UTIL 1/94; LETTER 5/95 = NO UTIL INVOLVED
BRUNSWICK TIP # BATS94-08 CONG DIST. 1
5 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1997 $ 388
FED SHARE $ 349
GA. SHARE $
39
OTH SHARE $
GLYNN 562110
STATUS:
CR 586 @ BURNETT CREEK EAST OF SR 27 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS GLYNN SIGNED FOR ROW, UTILITIES & DETOURS 9-15-94
BRUNSWICK TIP # BATS96-04 CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW LOCL
CONST 1998 $ 266
FED SHARE $ 213
GA. SHARE $
53
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
COASTAL
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
GLYNN 562120
STATUS:
SR 520 OVER LATHAM RIVER AT TWO LOCATIONS ON JEKYLL CAUSEWAY
BRIDGES / NEW CONSTRUCTION LENGTH(Miles/km): .20/.32180 MANAGER: KEVIN HOSEY REQ GLYNN CO DO UTIL 2-23-95(Y); CORPS ENGRS TO PAY 75% CST
BRUNSWICK TIP # BATS96-05 CONG DIST. 1
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 82
FISCAL YEAR
COST ESTS
PE 1997
$
ROW NONE
$
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
40 0
4771
1192 3579
'<
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
COASTAL
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
LIBERTY 520781
STATUS:
SR 196 FM US84/SR 38 TO SR 17/SR 25 SW OF I-95 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 8.85/14.23965
MANAGER: M. REYNOLDS
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521190 IS AN ASSOCIATED PROJECT.
;10-Sep-1996 Page 83
FISCAL YEAR
COST ESTS
PE 1992
ROW 1998 CONST
UNDERWAY $ 1140 AFTER 99
LIBERTY 571030
STATUS:
CEMETERY WALL REPAIR @ MIDWAY CHURCH
MISCELLANEOUS IMPROVEMENTS / ENHANCEMENT
CONG DIST. 1
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: MEG BRYSON
FUND SOURCE: TRANS. ENHANCE.
LGPA TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE $
0
CONST 1997
$
48
FED SHARE $
38
GA. SHARE $
OTH SHARE $
10
LIBERTY 571210
STATUS:
INTERPETIVE SIGNING, BIKE/PED PATH, LANDSCAPING, STREETSCAPE BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: TO BE DONE BY CONTRACT
CONG DIST. 1 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW LOCL
CONST 1998 $ FED SHARE $
GA. SHARE $ OTH SHARE $
1000 800
200
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
COASTAL
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
LONG 54196X
STATUS:
SR 196 OVER BEARD'S CREEK/ SEE TATTNALL C0--541960
UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
541960 IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 84
FISCAL YEAR
COST ESTS
PE NONE $
0
ROW NONE
$
0
CONST NONE
$
0
\!L- -~
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 85
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COASTAL
FISCAL
COST
-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S- -
MCINTOSH SR 25/US 17 @ BUTLER RIVER 1 MI SOUTH OF DARIEN
PE 1993 UNDERWAY
522240 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
C.ONG DIST. 1
ROW 1997
$
5
LENGTH(Miles/km): .80/1.28720
CONST 1997 $ 4062
MANAGER: TONY COLLINS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 3250
STATUS: MCINTOSH SIGNED FOR UTILITIES 6-9-92
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 812
OTH SHARE $
MCINTOSH RESTORE LIGHTHOUSE ON SAPELO ISLAND
571213 HISTORIC PRESERVATION / ENHANCEMENT
CONG DIST. 1
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1998 $ 220
FED SHARE $ 176
GA. SHARE $
OTH SHARE $
44
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COOSA VALLEY REGIONAL DEVELOPMENT CENTER
Bartow Catoosa Chattooga
Dade Floyd Gordon Haralson Paulding Polk Walker
10
. 0
10
-
'
SCALE IN MILES
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
COOSA VALLEY
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
BARTOW 620832
STATUS:
SR 61 @ ETOWAH RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. LENGTH(Miles/km): .63/1.01367 MANAGER: M. REYNOLDS REQ CO 12/84-UTIL;CITY SGN 12/84 CITY OWNED UTIL. AS (41)
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
BARTOW 621255
STATUS:
SR 61/CARTERSVILLE FM CR 533 NORTH TO HENDERSON DRIVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 2.61/4.19949
MANAGER: M. REYNOLDS CO REQ DO UTILITIES 3-11-96;REQ CARTERSVILLE DO UTIL 3-11-96
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
BARTOW 621440
STATUS:
SR 113 FM CR 31/STILESBORO NE TO SR 61 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.30/6.91870 MANAGER: M. GANNAWAY BARTOW COUNTY REFUSED 11-23-92
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 86
FISCAL YEAR
COST ESTS
PE 1995 UNDERWAY ROW 1988 UNDERWAY CONST 1999 $ 1500
FED SHARE $ 1200 GA. SHARE $ 300 OTH SHARE $
PE 1992
UNDERWAY
ROW 1996 UNDERWAY
CONST 1999
$ 3525
FED SHARE $ 2820
GA. SHARE $ 705
OTH SHARE $
PE 1999 ROW CONST
$ 204 AFTER 99
AFTER 99
BARTOW 62168X
STATUS:
SR 61@ 3 LOCATIONS PAULDING & BARTOW . . . SEE PAULDING CO UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: UNKNOWN
LANES:
CONG DIST. 0 & 0 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 621680 IS AN ASSOCIATED PROJECT.
BARTOW 631402
STATUS:
SR 3/US 41 FROM POSTELLE ST/CS 791 TO MLK IN CARTERSVILLE
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 7
LENGTH(Miles/km): 1.27/2.04343 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: GREG PARKER
FUND SOURCE: HWY. SAFETY
CARTERSVILLE SGN DO ROW & PUB UTIL 7-24-94.
FEDERAL HIGHWAY ADMIN FUNDS
BARTOW 631510
STATUS:
SR 20 AT STAMP CREEK 5.8 MI SE OF WHITE REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .37/.59533 MANAGER: GREG PARKER BARTOW SGN DO UTILITIES 4-25-96.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE 1994 UNDERWAY
ROW LOCL
CONST 1998
$
565
FED SHARE $
509
GA. SHARE $
57
OTH SHARE $
PE 1996 ROW 1999 CONST
UNDERWAY
$
34
AFTER 99
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 87
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
* -P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CATOOSA I-75 @ SR 3/US 41; & 61Y730 FOR NH $
CHATTANOOGA TIP IM-97-5
PE 1992 UNDERWAY
610730 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 9
ROW 1997 $ 4250
LENGTH(Miles/km): .95/1.52855 - EXIST. LANES: 2 /PROPOSED LANES: 4
CONST
AFTER 99
MANAGER: KEVIN HOSEY
FUND SOURCE: I-STATE MAINT.
STATUS: REQ CATOOSA COUNTY DO UTILITIES 10-26-92
FEDERAL HIGHWAY ADMIN FUNDS
61Y730 IS AN ASSOCIATED PROJECT.
CATOOSA CHICKAMAUGA BYP FM N OF MCFARLAND RD TO US 27 @ SR 2/WALKER
PE NONE
$
0
62119X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: M. GANNAWAY
FUND SOURCE: STATE FUNDS
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
621194 IS AN ASSOCIATED PROJECT.
CATOOSA 621530
STATUS:
SR 151 FM RELOC. HACKETT RD/CR 179 N TO I-75 @ RINGGOLD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.30/2.09170 MANAGER: K. FULBRIGHT REQ CATOOSA DO UTIL 3-11-96;CITY HAS NO OWNED UTIL 3-18-96.
CHATTANOOGA TIP # STP-98-2 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y530 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1998 $ 200
CONST 1999
$ 2500
FED SHARE $ 2000
GA. SHARE $ 500
OTH SHARE $
CATOOSA 62Y530
STATUS:
SR 151 FM RELOC CR 179 TO I-75; TO SHOW IM FUNDS FOR RAMPS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .00/.00000 MANAGER: K. FULBRIGHT
CHATTANOOGA TIP # STP-98-11
PE NONE $
0
CONG DIST. 9
ROW NONE
$
0
CONST 1999 $ 200
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 180
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
20
621530 IS AN ASSOCIATED PROJECT.
OTH SHARE $
CATOOSA 631420
STATUS:
SR2/SR 3/US 41 AT SPARKS STREET IN RINGGOLD
CHATTANOOGA TIP # STP-97-6
TURN LANES / SAFETY
CONG DIST. 9
LENGTH(Miles/km): .13/.20917- EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: GREG PARKER
FUND SOURCE: HWY. SAFETY
REV REQ CITY OF RINGGOLD DO UTILITIES 9-21-94
FEDERAL HIGHWAY ADMIN FUNDS
CATOOSA 631505
STATUS:
SR 2/US 41 @ SOUTH CHICKAMAUGA CREEK IN WEST RINGGOLD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): .92/1.48028 MANAGER: GREG PARKER RINGGOLD SGN DO UTILITIES 4-22-96;CATOOSA NO INVOLVED UTIL.
* CHATTANOOGA TIP BHF-99-4
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CATOOSA 631520
STATUS:
SR 2 AT TIGER CREEK 2.4 MI EAST OF RINGGOLD REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007
MANAGER: GREG PARKER CATOOSA REFUSED UTILITIES 9-13-94(Y)
* CHATTANOOGA TIP BHF-99-3
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY ROW 1996 UNDERWAY CONST 1997 $ 250
FED SHARE $ 250 GA. SHARE $
OTH SHARE $
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1999
$ 1917
FED SHARE $ 1534
GA. SHARE $ 383
OTH SHARE $
PE 1997 UNDERWAY
ROW NONE $
0
CONST 1999
$
568
FED SHARE $ 454
GA. SHARE $ 114
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
COOSA VALLEY
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CATOOSA 631600
STATUS:
SR 151 FROM CR 382 TO SR 2/US 41 IN RINGOLD AND SIGNALS
CHATTANOOGA TIP # STP-180-1(7)
TURN LANES / SAFETY
CONG DIST. 9
LENGTH(Miles/km): .92/1.48028 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: GREG PARKER
FUND SOURCE: SURFACE TRANSPORT.
CATOOSA SGN FOR ROW, UTIL, PUB UTIL & PVT UTIL 4-19-95.
FEDERAL HIGHWAY ADMIN FUNDS
CATOOSA 650430
STATUS:
SR 3/US 41 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .66/1.06194 MANAGER: K. FULBRIGHT REQ CATOOSA COUNTY DO UTILITIES 3-2-92; BI-STATE SGN 6-2-94
CHATTANOOGA TIP # STP-99-1 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CATOOSA 650440
STATUS:
SR 146/CLOUD SPRINGS RD FM LAKEVIEW DR TO I-75/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 2.34/3.76506 MANAGER: M. GANNAWAY REQ CATOOSA DO UTILITIES 3-2-92
CATOOSA 65Y440
STATUS:
SR 146/CLOUD SPGS RD FM LAKEVIEW TO I-75&BRIDGE .. SEE 650440 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.34/3.76506 MANAGER: M. GANNAWAY
CATOOSA 670710
STATUS:
CR 259 SOUTH OF RINGGOLD @ LITTLE CHICKAMAUGA CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .14/.22526 MANAGER: GREG PARKER CATOOSA SGN FOR ROW, UTILITIES & DETOURS 11-6-95
CHATTANOOGA TIP # STP-99-2 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 65Y440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP # STP-98-2 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 650440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP # BRZ-98-1 CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 88
FISCAL YEAR
COST ESTS
PE 1996 UNDERWAY
ROW LOCL
CONST 1997
$
408
FED SHARE $ 326
GA. SHARE $
82
OTH SHARE $
PE 1993 UNDERWAY
ROW 1997
$
165
CONST 1999
$
655
FED SHARE $ 524
GA. SHARE $ 131
OTH SHARE $
PE 1992 ROW 1998 CONST
UNDERWAY
$ 3551 AFTER 99
PE NONE ROW 1998 CONST
$
0
$ 598
AFTER 99
PE 1996 UNDERWAY
ROW LOCL
CONST 1998 $ 1190
FED SHARE $
952
GA. SHARE $ 238
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 89
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L--D--EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHATTOOG CR 170/PENN BRIDGE RD OVER CHATTOOGA RIVER SE OF TRION
PE 1993 UNDERWAY
670750 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 7
ROW LOCL
LENGTH(Miles/km): .15/.24135
CONST 1997
$ 1079
MANAGER: GREG PARKER
.FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
863
STATUS: CHATTOOGA SGN 4-7-92 FOR ROW, UTILITIES & DETOURS
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 216
OTH SHARE $
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 90
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.N--O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DADE
I-24/I-59 INTERCHANGE - THREE BRIDGES
CHATTANOOGA TIP # IM-97-8
PE 1995 UNDERWAY
610990 BRIDGES / RECST. OR REHAB,
CONG DIST. 9
ROW NONE $
0
LENGTH(Miles/km): ,00/.00000
CONST 1997
$ 1169
MANAGER: M. GANNAWAY STATUS: DADE COUNTY SIGNED FOR UTILITIES 2-27-95
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 1052
GA. SHARE $
117
OTH SHARE $
DADE 611020
STATUS:
I-24/SR 409 FROM I-59 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 3.27/5.26143 MANAGER: M. GANNAWAY
CHATTANOOGA TIP # NH-99-5 CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW NONE CONST
$ 325
$
0
AFTER 99
DADE 621230
STATUS:
SR 136/TRENTON FM CR 52 TO SR 58/US 11 INCL INTERCHANGE @ 59 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): .80/1.28720
MANAGER: M. GANNAWAY DADE SGN 12-18-92 & TRENTON SGN 12-29-92 FOR UTILITIES.
DADE 62Y230
STATUS:
SR 136 FM CR 52 TO SR 58; TO SHOW IM FUNDS FOR INT WITH I-59 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): ,00/.00000
MANAGER: M. GANNAWAY
DADE 630915
STATUS:
SR 136 E/TRENTON EB 6.4-7.2/EB 10,6-11.85/WB 10.6-11.85 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.05/3.29845 MANAGER: GREG PARKER DADE SGN 10-15-91 - UTIL; TRENTON SGN 10-11-91 PUB UTIL.
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y230 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 621230 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1992 ROW 1998 CONST
UNDERWAY $ 410 AFTER 99
PE NONE $
0
ROW 1997
$
100
CONST 1999 $ 500
FED SHARE $ 450
GA. SHARE $
50
OTH SHARE $
PE 1992 UNDERWAY
ROW 1996 UNDERWAY
CONST 1998
$ 1613
FED SHARE $ 1290
GA. SHARE $ 323
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 91
PROJECT LISTING BY RDC FY 1997IFY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-TS----------------------------Y-EA-R---------E-S-T-S--
FLOYD PUBLIC TRANSIT SERVICE FOR THE CITY OF ROME
6D6016 TRANSIT PROJECTS I OPERATIONS
CONG DIST. 7
FUNDS RECIPIENT: ROME TRANSIT DEPARTMENT MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
OPERATING 1997
$ 1150
FED SHARE $ 230
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
71
OTH SHARE $
849
FLOYD 6D6017
STATUS:
SUPV.VCH.,TRANS.VCH(WIL) . 1 MAINT.TLS&EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ROME TRANSIT DEPARTMENT MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$ 460
FED SHARE $ 368
GA. SHARE $
46
OTH SHARE $
46
FLOYD 6D6019
STATUS:
TRAN.VCH WIL 1 SUPV1 VCH.,ADM.VAN,MANT.TLS&EQUIP.,MNT.ITEMS
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1998
$ 592
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
474
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
59
OTH SHARE $
59
FLOYD 6D6021
STATUS:
TRANS VCH WIL,ADMIN VAN,MAINT.TLS&EQUIP.,MAINT ITEMS TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: ROME TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$ 592
FED SHARE $
474
GA. SHARE $
59
OTH SHARE $
59
FLOYD 6D6022
STATUS:
PUBLIC TRANSIT SERVICE FOR THE CITY OF ROME TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ROME TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1190 150
1040
FLOYD 6D6023
STATUS:
TRANSIT VCH WIL, SUPERV.VCH.,MAINTENANCE TOOLS
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ROME TRANSIT DEPARTMENT
MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1999
$ 684
FED SHARE $
547
GA. SHARE $
68
OTH SHARE $
68
FLOYD 6D6024
STATUS:
TRANSIT VCH. WIL, SUPERV.VCYH. 1 MAINTEN TOOLS AND EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ROME TRANSIT DEPARTMENT
MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1999
$ 684
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $ 547
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
68
OTH SHARE $
68
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 92
PROJECT LISTING BY ROC FY 1997IFY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FLOYD OPERATING SCHEDULE
606025 TRANSIT PROJECTS I OPERATIONS
CONG DIST. 7
FUNDS RECIPIENT: ROME TRANSIT DEPARTMENT
OPERATING 1999
$ 1232
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
FED SHARE $ 150
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $ 1082
FLOYD 6V7014
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA
MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1997
$
30
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
FLOYD 6V7015
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1998
$
31
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
FLOYD 6V7018
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA
MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1999
$
33
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
4
OTH SHARE $
3
FLOYD 620590
STATUS:
SR 1IUS 27 IN ROME FM 5TH AVE TO JOHN DAVENPORT DR RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. LENGTH(Mileslkm): .171.27353 MANAGER: B. FERGUSON FLOYD NO UTILITIES; ROME SGN UTILITIES EXCEPT AT RR 11-2-93
ROME TIP # L-85-11 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1997
$ 1113
CONST 1999
$ 2952
FED SHARE $ 2362
GA. SHARE $
590
OTH SHARE $
FLOYD 621550
STATUS:
SR 201100 FM SR 100 NORTH TO SR 100 SOUTH @ COOSAIINCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Mileslkm): 2.9514.74655
MANAGER: GREG PARKER LETTER 1194: NO PUB UTIL BUT HAS PVT UTIL.EXPECTS DOT TO PAY
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1999 CONST
UNDERWAY
$
790
AFTER 99
FLOYD 621560
STATUS:
SR 53 FM MP 0.54 TO 14.15 [WON 20 CLVTS] BRIDGES I RECST. OR REHAB. LENGTH(Mileslkm): 14.89123.95801 MANAGER: GREG PARKER
FLOYD REFUSED 1-19-94; CAVE SPRING SGN 7192 AS MUCH AS POSS.
ROME TIP # S-94-14 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1998
CONST
UNDERWAY
$
44
AFTER 99
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196, (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 93
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
* -P--.I-.-N-O--. ----------------PR--O-JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FLOYD WEST ROME BYP FM HORSELEG CRK RD TO SR 20
ROME TIP S-92-24
PE NONE
$
0
621660 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
CONG DIST. 7
ROW 1998
$ 1582
LENGTH{Miles/krn): 3.60/5.79240 MANAGER: M. GANNAWAY
FUND SOURCE: NAT'L HIGHWAY
CONST 1999 $ 9630 FED SHARE $ 7704
STATUS: DOT TO FUND ROW & UTILITITES FOR FLOYD PER LETTER 2-15-93
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1926
621920 IS AN ASSOCIATED PROJECT.
OTH SHARE $
FLOYD 621670
STATUS:
SW ROME BYP FM PROP. W ROME BYP @ CR 638 TO SR 1 @ CR 633 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH{Miles/krn): 2.90/4.66610 MANAGER: M. GANNAWAY DOT TO FUND ROW & UTILITIES FOR FLOYD PER LETTER 2-15-93
* ROME TIP S-92-23
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 621920 IS AN ASSOCIATED PROJECT.
PE NONE
$
ROW 1998
$
CONST 1999
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 1836 9275 7420
1855
FLOYD 621890
STATUS:
SR 1/US 27 NBL & SBL @ SILVER CK & SOUTHERN RR IN SW ROME REHABILITATION OF THE EXISTING BRIDGE{S). NO ADDED LANES. LENGTH{Miles/krn): .28/.45052 MANAGER: GREG PARKER ROME SGN DO PUBLIC UTILITIES 8/8/96;FLOYD HAS NO UTILITIES.
* ROME TIP S-95-10
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1998 $ 1261
FED SHARE $ 1009
GA. SHARE $
252
OTH SHARE $
FLOYD 621920
STATUS:
WEST ROME BYP: FM CR 638 N TO CR 268 INCL BR @ COOSA RIVER CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH{Miles/krn): 1.30/2.09170 MANAGER: M. GANNAWAY DOT TO FUND UTILITIES FOR FLOYD PER LETTER 2-15-93
* ROME TIP L-89-10
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 621670 IS AN ASSOCIATED PROJECT.
PE 19.93 UNDERWAY
ROW NONE
$
0
CONST 1999 $ 2588
FED SHARE $ 2070
GA. SHARE $ 518
OTH SHARE $
FLOYD 622000
STATUS:
SR 1/US 27 AT SR 1LP/VETERANS MEM HWY N OF THE CITY OF ROME
INTERSECTION IMPROVEMENT / RECST. OR REHAB.
CONG DIST. 7
LENGTH{Miles/krn): .46/.74014- EXIST. LANES: 6 /PROPOSED LANES: 8
MANAGER: GREG PARKER
FUND SOURCE: HWY. SAFETY
ROME SGN DO ROW & UTIL 1-26-96; OTO
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1997 $ 241
FED SHARE $ 217
GA. SHARE $
24
OTH SHARE $
FLOYD 650410
STATUS:
DIVISION ST/ROME FM SHORTER AVE TO REDMOND RD/& REMOVE RR BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/krn): .90/1.44810 MANAGER: J. GARLAND ROME SGN 4-15-91 R & U SEE REMARKS;CO SGN 4-02-96 ROW & UTIL
ROME TIP # L-85-12 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW LOCL
CONST 1998 $ 2416 FED SHARE $ 1933 GA. SHARE $ 483 OTH SHARE $
FLOYD 650460
STATUS:
SR 101 OVER ETOWAH RIVER IN ROME REPLACEMENT OF THE EXISTING BRIDGES{S). FROM 4 TO 5 LANES. LENGTH(Miles/krn): .37/.59533
MANAGER: D. SMITH CITY OF ROME SIGNED FOR UTILITIES 11-20-95
ROME TIP # L-89-04 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.
PE 1993 UNDERWAY ROW 1998 $ 4459 CONST 1999 $ 4551
FED SHARE $ 3641 GA. SHARE $ 910
OTH SHARE $
Ui!i:'--
- l~'.:
-e-~--:::"'::::'1<>1
~:_--:,. -'::.~<;.~
~:_.<,.,-:~_"0:';: '~-}
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 94
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FLOYD CR 181/0LD SUMMERVILLE RD AT ARMUCHEE CREEK
PE 1996 UNDERWAY
650600 SIGNALS / SAFETY
CONG DIST. 7
ROW LOCL
LENGTH(Miles/km): .10/.16090- EXIST. LANES: 2 /PROPOSED LANES: 4
CONST 1997 $
30
MANAGER: KARL ALFF
FUND SOURCE: HWY. SAFETY
FED SHARE $
27
STATUS: REQ CITY DO ROW, UTIL & DET 3-12-96.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
FLOYD 670820
STATUS:
MAYO'S BAR LOCK AND DAM RESTORATION ON COOSA RIVER
HISTORIC FACILITIES / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: MEG BRYSON TO BE DONE BY CONTRACT
ROME TIP # S-94-15 CONG DIST. 7 0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1997
$
563
FED SHARE $
450
GA. SHARE $
OTH SHARE $
113
FLOYD 671070
STATUS:
CITY OF ROME -"OOSTANAULA RIVER TRAIL"
BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 7
LENGTH(Mi1es/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: MEG BRYSON
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW LOCL
CONST 1997
$
625
FED SHARE $
500
GA. SHARE $
OTH SHARE $
125
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 95
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ----------------P-R-O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GORDON SR 53 OVER I-75
PE 1992
UNDERWAY
610550
TURN LANES / RECST. OR REHAB.
CONG DIST. 9
LENGTH(Miles/km): .19/.30571- EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: M. GANNAWAY
FUND SOURCE: I-STATE MAINT.
ROW 1997
$
CONST 1998
$
FED SHARE $
120 2291 2062
STATUS: CALHOUN SGN DO UTIL 10-25-93;GORDON SGN 10-21-93 UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 229
OTH SHARE $
GORDON 610750
STATUS:
I-75 @ SR 156 IN CALHOUN
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 9
LENGTH(Miles/km): .50/.80450 - EXIST. LANES: 3 /PROPOSED LANES: 5
MANAGER: M. GANNAWAY
FUND SOURCE: I-STATE MAINT.
GORDON SGN P UTL 2/94;CITY SGN P UTIL/REFUSED PVT UTL 2/94
FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1997
$
250
CONST 1998
$ 3298
FED SHARE $ 2968
GA. SHARE $
330
OTH SHARE $
GORDON 610755
STATUS:
I-75 @ SR 225 N OF CALHOUN (INCLUDING I-75 BRIDGE) INTERCHANGE / RECST. OR REHAB. LENGTH(Miles/km): .40/.64360- EXIST. LANES: 6 /PROPOSED
MANAGER: RAY METTS GORDON REF UTIL 11-9-92;CALHOUN SGN FOR P UTIL 2-14-94.
LANES:
CONG DIST. 9 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1997
$
56
CONST 1998
$
788
FED SHARE $
630
GA. SHARE $
158
OTH SHARE $
GORDON 610870
STATUS:
I-75 @ UNION GROVE RD/CR 65 RELOC IN CALHOUN; & 61Y870
INTERCHANGE / NEW CONSTRUCTION
CONG DIST. 9
LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: 3 /PROPOSED LANES: 3
MANAGER: J. GRAYBEAL
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
61Y870 IS AN ASSOCIATED PROJECT.
PE 1999 ROW LOCL CONST
$ 160 AFTER 99
GORDON 610925
STATUS:
I-75 RA 34 ENLARGE RESTROOMS & UPGRADE ADA STANDARDS-PH II REST AREA / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: J. GARLAND NOT APPLICABLE
CONG DIST. 9 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1999 $ 1168
FED SHARE $ 1051
GA. SHARE $ 117
OTH SHARE $
GORDON 610930
STATUS:
I-75 INTERCHANGE @ SR"136 & WIDENING ON SR 136; 61Y930
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 9
LENGTH(Miles/km): .75/1.20675- EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: KEVIN HOSEY
FUND SOURCE: SURFACE TRANSPORT.
GORDON REFUSED TO DO UTILITIES 2-28-95
FEDERAL HIGHWAY ADMIN FUNDS
61Y930 IS AN ASSOCIATED PROJECT.
GORDON 611006
STATUS:
I-75 RA 35 ENLARGE RESTROOMS & ADA STANDARDS--PH II
REST AREA / RECST. OR REHAB.
GONG DIST. 9
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. GARLAND
FUND SOURCE: I-STATE MAINT.
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW 1997
$
753
CONST 1999 $ 2435
FED SHARE $ 1948
GA. SHARE $ 487
OTH SHARE $
PE NONE $
0
ROW NONE $
0
CONST 1999
$
746
FED SHARE $
671
GA. SHARE $
75
OTH SHARE $
~-:::_":~::!"!'-'
r.t.:Z":.:";:..~~
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 96
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GORDON I-75 INTERCHANGE @ SR 136 & WIDENING ON SR 136; 610930
PE NONE $
0
61Y930 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 9
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 6 /PROPOSED LANES: 6
ROW NONE CONST 1999
$
0
$ 1624
MANAGER:
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 1462
STATUS: GORDON REFUSED TO DO UTILITIES 2-28-95
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 162
610930 IS AN ASSOCIATED PROJECT.
OTH SHARE $
GORDON 621510
STATUS:
SR 53 @ CSX RR/FAIRMOUNT REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES. LENGTH(Miles/km): .20/.32180
MANAGER: GREG PARKER CO SGN FOR PUB UTL 11-15-91; FAIRMOUNT SGN UTILITIES 11-4-91
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 19.94
UNDERWAY
CONST 1997
$ 1360
FED SHARE $ 1088
GA. SHARE $ 272
OTH SHARE $
GORDON 621540
STATUS:
SR 53 WB MP 14.67-15.8;EB MP 15.84-16.69;EB MP 18.1-19.37 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 3.25/5.22925 MANAGER: GREG PARKER GORDON COUNTY SIGNED 10-15-91 FOR UTILITITES
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1997
$
95
CONST 1998 $ 1086
FED SHARE $ 869
GA. SHARE $ 217
OTH SHARE $
GORDON 621545
STATUS:
SR 53 @ PINE LOG CREEK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .26/.41834 MANAGER: GREG PARKER REQ GORDON COUNTY DO UTILITIES 6-18-91
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1998 $ 309
FED SHARE $ 247
GA. SHARE $
62
OTH SHARE $
GORDON 631290
STATUS:
SR 136 EB MP 10-11.3; WB MP 12.3-13.6 EAST OF RESACA ADDITION OF A PASSING LANE.
LENGTH(Miles/km): 2.60/4.18340 MANAGER: GREG PARKER GORDON REFUSED TO COMMIT ANY FUNDING 11-25-95
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW CONST
$
50
AFTER 99
AFTER 99
GORDON 631570
STATUS:
SR 225 BRIDGE WIDENING OVER NEW TOWN CREEK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: GREG PARKER GORDON REFUSED TO COMMIT FUNDS 8-10-95.
CONG. DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW CONST
$
9
AFTER 99
AFTER 99
GORDON 632690
STATUS:
SR 61/US 411 AT SR 136 NORTH OF OAKMAN
TURN LANES / SAFETY
LENGTH(Miles/km): .37/.59533- EXIST. LANES: 2 /PROPOSED LANES:
MANAGER: UNKNOWN
GORDON COUNTY SIGNED FOR ROW AND UTIL 6-4-96.
OTO
CONG DIST. 9 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1997 UNDERWAY
ROW LOCL
CONST 1998 $ 277
FED SHARE $ 249
GA. SHARE $
28
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 97
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GORDON UNION GROVE ROAD/CR 65 RELOCATION FM SR 3 TO SR 53 / CALHOUN
PE 1999 $ 200
662510 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
CONG DIST. 9
ROW LOCL
LENGTH(Miles/km): 3.20/5.14880
CONST
AFTER 99
MANAGER: J. GRAYBEAL
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
GORDON 670940
STATUS:
COOSAWATTEE RIVER TRAIL
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 9
LENGTH(Miles/km): 2.34/3.76506 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: JANET HARVEY
FUND SOURCE: TRANS. ENHANCE.
LGPA TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GORDON 670942
STATUS:
HISTORIC PRESERVATION OF CALHOUN DEPOT AS TRAILHEAD HISTORIC PRESERVATION / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT
LANES:
CONG DIST. 9 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
GORDON 670944
STATUS:
PEDESTRIAN TRAIL IN CALHOUN
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 9
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: JANET HARVEY
FUND SOURCE: TRANS. ENHANCE.
LGPA TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW LOCL
CONST 1997
$
873
FED SHARE $ 698
GA. SHARE $
OTH SHARE $ 175
PE LOCL
ROW LOCL
CONST 1997
$
221
FED SHARE $ 177
GA. SHARE $
OTH SHARE $
44
PE LOCL
ROW LOCL
CONST 1997 $ 157
FED SHARE $ 126
GA. SHARE $
OTH SHARE $
31
'&.
r -
\.::
tt_,
lc,_~~)
, ( ______
'__ rr..-..:--~ ':J
r:?t_
r :_.~-
_.!
-~
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 98
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R- -------E-S-T-S--
HARALSON I-20 SAFETY IMPROVEMENTS FRM ALA STATE LINE TO SR 61/CARROLL
PE NONE $
0
610910 GUARDRAIL / SAFETY
CONG DIST. 7
LENGTH(Miles/km): 22.00/35.39800 - EXIST. LANES: 0 /PROPOSED LANES: 0
ROW NONE $
0
CONST 1997 $ 189
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 189
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
61091X IS AN ASSOCIATED PROJECT.
OTH SHARE $
HARALSON CR 341/CASHTOWN RD FM SR 8/BREMEN N TO MORGAN RD/CR 346 631140 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
LENGTH(Miles/km): 4.36/7.01524 MANAGER: M. GANNAWAY
STATUS: HARALSON SGN DO UTILITIES 9-8-92
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1997
$
296
CONST 1998 $ 5000
FED SHARE $ 4000
GA. SHARE $ 1000
OTH SHARE $
HARALSON SR 8 EB MP 15.8-17.3; CENTER TL MP 14.0-14.9 631170 ADDITION OF A PASSING LANE.
LENGTH(Miles/km): 2.20/3.53980 MANAGER: GREG PARKER STATUS: COUNTY SGN FOR UTIL 9-8-92; BREMEN REFUSED 2-18-92(Y)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1995 UNDERWAY CONST 1997 $ 1422
FED SHARE $ 1138 GA. SHARE $ 284 OTH SHARE $
HARALSON SR 1/US 27 BUS: OVER SOUTHERN RAILROAD IN BUCHANAN 641950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .24/.38616 MANAGER: GREG PARKER STATUS: REQ HARALSON CO DO UTIL 1-19-96. BUCHANAN REF 2-9-96.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1995 UNDERWAY
ROW 1998 $
11
CONST 1999
$
377
FED SHARE $ 302
GA. SHARE $
75
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
20-Sep-1996 Page 99
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-ST--S--
PAULDING SR 61/DALLAS @ NORFOLK RR & RELOC SR 61 TO TIE SR6BUS/62Y834
PE 1992 UNDERWAY
620834 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
CONG DIST. 7
ROW 1996 UNDERWAY
LENGTH(Miles/km): .47/.75623 MANAGER: GREG PARKER STATUS: DALLAS SGN FOR UTILITIES 9/30/87;DOT AGREED TO PAY CO UTIL.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONST 1997 $ FED SHARE $ GA. SHARE $
1116 893 223
62Y834 IS AN ASSOCIATED PROJECT.
OTH SHARE $
PAULDING SR 61 FM DALLAS NEBO RD/CR 467 TO SR 768/DALLAS BYPASS 621570 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.90/6.27510 MANAGER: J. GARLAND STATUS: PAULDING SGN P UTIL ONLY 4/96;DALLAS SGN P UTIL ONLY 12/95.
ATLANTA TIP # CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 641830 IS AN ASSOCIATED PROJECT.
PE 1997 ROW 1998
CONST
UNDERWAY $ 3500 AFTER 99
PAULDING SR 61/DALLAS @ SOUTHERN RR; TO SHOW 315 FUNDS; SEE 620834 62Y834 BRIDGES / REPLACEMENT
LENGTH(Miles/km): .00/.00000 MANAGER: GREG PARKER STATUS: DOT HELPING WATER AUTHORITY WITH THIS & 7 MORE PROJECTS
PE NONE
$
0
CONG DIST. 7
ROW NONE
$
0
CONST 1997
$
325
FUND SOURCE: NAT'L HIGHWAY
FED SHARE $ 260
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
65
620834 IS AN ASSOCIATED PROJECT.
OTH SHARE $
PAULDING SR 92 AT GRAYS MILL CREEK IN SOUTH HIRAM 631525 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .04/.06436 MANAGER: GREG PARKER STATUS: HIRAM SGN DO UTIL 10/95;DOT AGREED TO PAY PAULDING UTILITY.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PAULDING SR 61 AT RIDGE ROAD/MULBERRY ROCK RD SOUTH OF DALLAS 631630 TURN LANES / SAFETY
LENGTH(Miles/km): .61/.98149- EXIST. LANES: 2 /PROPOSED MANAGER: GREG PARKER STATUS: REQ PAULDING DO ROW & UTILITIES 8-6-96.
LANES:
CONG DIST. 7 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1997
$ 1372
FED SHARE $ 1098
GA. SHARE $ 274
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1998 $ 306
FED SHARE $ 275
GA. SHARE $
31
OTH SHARE $
PAULDING SR 120 OVER LANE CREEK 2.3 MI SW OF DALLAS 632660 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .40/.64360 MANAGER: GREG PARKER STATUS: PAULDING REFUSED UTILITIES 8-8-96.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW
CONST
$
10
AFTER 99
AFTER 99
PAULDING SR 92 AT SR 120 CONNECTOR IN HIRAM
641980 TURN LANES / SAFETY
CONG DIST. 7
LENGTH(Miles/km): .45/.72405- EXIST. LANES: 2 /PROPOSED LANES: 5
MANAGER: GREG PARKER
FUND SOURCE: HWY. SAFETY
STATUS: REQ HIRAM DO ROW & UTIL 9-25-94;DOT AGREED TO PAY CO UTIL.
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1994 UNDERWAY
ROW LOCL
CONST 1997 $ 524
FED SHARE $ 472
GA. SHARE $
52
OTH SHARE $
'~. -:"-~''"')
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
COOSA VALLEY
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
PAULDING SR 61 AT SR 120 CONNECTOR 642030 INTERSECTION IMPROVEMENT / SAFETY
LENGTH(Miles/km): .26/.41834- EXIST. LANES: MANAGER: GREG PARKER
STATUS: DOT TO PAY PAULDING UTILITIES 7/18/95.
3 /PROPOSED LANES:
CONG DIST, 7 4
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PAULDING CITY OF DALLAS HISTORICAL DISTRICT
670920 SIDEWALKS / ENHANCEMENT
CONG DIST. 7
LENGTH(Miles/km): ,00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: STAN HAMES
FUND SOURCE: TRANS. ENHANCE.
STATUS: LGPA TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 100
FISCAL YEAR
COST ESTS
PE 1994 UNDERWAY ROW LOCL CONST 1998 $ 606
FED SHARE $ 606 GA. SHARE $ OTH SHARE $
PE LOCL
ROW NONE $
0
CONST 1997 $
94
FED SHARE $
75
GA. SHARE $
OTH SHARE $
19
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 101
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
POLK 620645
SR 6 FM OLD CEDARTOWN RD/CR 193 E TO SR 101/ROCKMART; 62R645 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.60/7.40140 MANAGER: RAY METTS
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT.
PE 1992 UNDERWAY
ROW 1997 $ 4000 CONST 1999 $ 8735
FED SHARE $ 6988
STATUS: REQ POLK CO DO UTIL 10-31-95; ROCKMART REFUSED 12-27-95
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1747
62Y645 IS AN ASSOCIATED PROJECT.
OTH SHARE $
POLK 620647
STATUS:
SR 6 FM CR 154 EASTERLY TO OLD CEDARTOWN RD/CR 193 & 62R647 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.60/7.40140 MANAGER: RAY METTS
POLK SGN UTILITIES 11-28-95; CEDARTOWN SGN PUBLIC UTL 11/95
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1997
$ 3000
CONST 1999 $ 5241
FED SHARE $ 4193
GA. SHARE $ 1048
OTH SHARE $
POLK 621420
STATUS:
SR 113 FM ROCKMART BYP/CR 433 TO TAYLORSVILLE CTY LMT/CR 249 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 5.40/8.68860 MANAGER: M. GANNAWAY CITY SGN 6/91 P UTIL;DOT TO PAY PVT UTIL FOR POLK & ROCKMART
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW 1995 UNDERWAY CONST 1999 $ 10752
FED SHARE $ 8602 GA. SHARE $ 2150 OTH SHARE $
POLK 621470
STATUS:
SR 1/US 27 OVER CEDAR CREEK NEAR CEDARTOWN REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .21/.33789 MANAGER: J. GRAYBEAL POLK REFUSED 9-16-92.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1997 $ 283
FED SHARE $ 226
GA. SHARE $
57
OTH SHARE $
POLK 621475
STATUS:
SR 1/US 27: BRIDGE OVER CEDAR CREEK TRIBUTARY SE CEDARTOWN REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .02/.03218 MANAGER: J. GRAYBEAL LGPA COVERED BY #621470
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1999
$
133
FED SHARE $ 106
GA. SHARE $
27
OTH SHARE $
POLK 62R645
STATUS:
SR 6 FM OLD CEDARTOWN RD E TO SR 101 FOR ADDL RW -SEE 620645 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .00/.00000 MANAGER: RAY METTS
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 620645 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1998
CONST NONE
UNDERWAY
$ 4345
$
0
POLK 62R647
STATUS:
SR 6 FM CR 154 TO OLD CEDARTOWN RD; FOR ADDL RW - SEE 620647 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .00/.00000 MANAGER:
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1998 CONST NONE
UNDERWAY
$ 3750
$
0
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
COOSA VALLEY
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
POLK 631280
STATUS:
CR 439/LIME BRIDGE ROAD OVER McCURRY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .10/.16090 MANAGER: GREG PARKER POLK COUNTY SGN 7-7-92 ROW, UTILITIES & DETOURS
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
POLK 641880
STATUS:
SR 1 BUS FM THORNTON AVE TO CEDARTOWN BYPASS
TURN LANES / SAFETY
CONG DIST. 7
LENGTH(Miles/km): 1.54/2.47786 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: GREG PARKER
FUND SOURCE: HWY. SAFETY
CEDARTOWN REF DO UTIL 6-4-96;POLK SGN FOR UTIL 6-4-96.
FEDERAL HIGHWAY ADMIN FUNDS
POLK 670900
STATUS:
OLD CSX RAILROAD CORRIDOR FROM CEDARTOWN TO ALABAMA BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT
CONG DIST. 7 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
POLK 671072
STATUS:
IRON HORSE RAIL-TRAIL IN CEDARTOWN
BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 7
LENGTH(Miles/km): 2.25/3.62025 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: JANET HARVEY
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 102
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW LOCL
CONST 1998
$
215
FED SHARE $ 172
GA. SHARE $
43
OTH SHARE $
PE 1994 ROW 1999 CONST
UNDERWAY $ 250 AFTER 99
PE LOCL
ROW 1997
$
28
CONST 1997
$
407
FED SHARE $
320
GA. SHARE $
OTH SHARE $
87
PE LOCL
ROW LOCL
CONST 1997
$
524
FED SHARE $
419
GA. SHARE $
OTH SHARE $ 105
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 103
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
COOSA VALLEY
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
WALKER CHICKAMAUGA BYP PAVING FM LONGHOLLOW RD TO MCFARLAND &GAP RD
CHATTANOOGA TIP # NPS-97-2
PE NONE $
0
621193 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
CONG DIST. 9
ROW NONE $
0
LENGTH(Miles/km): 3.00/4.82700
CONST 1997 $ 6170
MANAGER: M. GANNAWAY
FUND SOURCE: STATE FUNDS
FED SHARE $ 4628
STATUS: DOT TO PAY ALL UTILITIES 1-27-93.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1543
OTH SHARE $
WALKER 621194
STATUS:
CHICKAMAUGA BYP FM N OF MCFARLAND RD TO US 27 @ SR 2/CATOOSA CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 2.00/3.21800 MANAGER: M. GANNAWAY DOT TO PAY ALL UTILITIES 1-27-93.
CHATTANOOGA TIP t NPS-97-3 CONG DIST. 9
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS 62119X IS AN ASSOCIATED PROJECT.
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 21410 16058 5353
WALKER 641810
STATUS:
SR 1/US 27 FM EXIST 5 LN NEAR CR 215 TO CHICKAMAUGA BYP
CHATTANOOGA TIP # STP-97-4
TURN LANES / SAFETY
CONG DIST. 9
LENGTH(Miles/km): 1.01/1.62509 - EXIST. LANES: 4 /PROPOSED LANES: 5
MANAGER: GREG PARKER
FUND SOURCE: SURFACE TRANSPORT.
COUNTY SGN 2-1-91 UTIL, ROW, DCL
OTO
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$
734
FED SHARE $ 587
GA. SHARE $ 147
OTH SHARE $
WALKER 650580
STATUS:
SR 1/US 27 RELOCATE INTERS. @ WARTHEN RD/CR 130 IN LAFAYETTE
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 9
LENGTH(Miles/km): .40/.64360- EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: GREG PARKER
FUND SOURCE: HWY. SAFETY
REQ CITY DO ROW, UTIL & DETOURS 3-6-96.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
15
AFTER 99
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA MOUNTAINS REGIONAL DEVELOPMENT CENTER
Banks Dawson Forsyth Franklin Habersham
Hall Hart Lumpkin Rabun Stephens Towns Union White
10 0
10
SCALE IN MILES
GEORGIA MOUNTAINS
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
GEORGIA MOUNTAINS
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
BANKS 11044Y
STATUS:
I-85 SIGN MOD FM SR 211 TO SC STATE LN; & BANKS/FRANKLIN UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: KARL ALFF
CONG DIST. 0 & 0 0
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS 110440 IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 104
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST NONE $
0
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1997/FY 1999
20-Sep-1996 Page 105
COUNTY P .I. NO.
DESCRIPTION PROJECT DATA
GEORGIA MOUNTAINS REGIONAL DEVELOPMENT COMMISSION
COMMENTS
FISCAL YEAR
COST ESTS
---------------------------------------------------------------------------------------------------------~-------------------------
DAWSON SR 136 AT SHOAL CREEK and BURT CREEK
PE 1997
$
20
142070 BRIDGES / REPLACEMENT
CONG DIST. 9
ROW 1997 $
10
LENGTH(Miles/km): .40/.64360
CONST 1997
$
546
MANAGER: L. OWENS
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $
437
STATUS: REQ DAWSON COUNTY DO UTILITIES 12-7-95
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
109
OTH SHARE $
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
GEORGIA MOUNTAINS
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
FORSYTH 121980
STATUS:
SR 141 FM 0.6 MI NORTH OF FULTON CO LINE TO SR 9 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 6.81/10.95729 MANAGER: B. FERGUSON FORSYTH COUNTY REFUSED 1-8-92.
ATLANTA TIP # CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 106
FISCAL YEAR
COST ESTS
PE 1992 ROW 1997
CONST
UNDERWAY $ 6734 AFTER 99
FORSYTH 132510
STATUS:
SR 53 AT CR 226/CRYSTAL COVE-WESTBROOK ROADS
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 9
LENGTH(Miles/km): .45/.72405- EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: L. OWENS
FUND SOURCE: HWY. SAFETY
FORSYTH SGN FOR ROW & UTILITIES 10-23-95
FEDERAL HIGHWAY ADMIN FUNDS
FORSYTH 132640
STATUS:
SR 141 AT SHARON ROAD SOUTH OF CUMMING
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 9
LENGTH(Miles/km): .27/.43443- EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS
FUND SOURCE: HWY. SAFETY
FORSYTH COUNTY SIGNED FOR ROW, UTIL 11-13-95
OTO
FEDERAL HIGHWAY ADMIN FUNDS
FORSYTH 141605
STATUS:
SR 20/SR 9/CUMMING @ CS 526; & CR 87
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST' 9
LENGTH(Miles/km): .10/.16090- EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS
FUND SOURCE: HWY. SAFETY
COUNTY REFUSED DUE TO COST 9-15-93(N)
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1997
$
890
FED SHARE $ 890
GA. SHARE $
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1998 $
85
FED SHARE $
77
GA. SHARE $
9
OTH SHARE $
PE 1998 ROW LOCL CONST
$
5
AFTER 99
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 107
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
GEORGIA MOUNTAINS
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FRANKLIN I-85 SIGN MOD FM SR 211 TO SC STATE LN; & BANKS/JACKSON
PE NONE
$
0
11044Z UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: KARL ALFF
FUND SOURCE: I-STATE MAINT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
110445 IS AN ASSOCIATED PROJECT.
* FRANKLIN I-85 UPGRADE NB REST AREA 81, PHASE II
110462 REST AREA / RECST. OR REHAB.
CONG DIST. 10
LENGTH(Mi1es/km): .00/.00000 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: J. GARLAND
FUND SOURCE: I-STATE MAINT.
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1997
$
600
FED SHARE $
540
GA. SHARE $
60
OTH SHARE $
FRANKLIN SR 17[@I-85 RECST INTERCHANGE-IM]FM NCL LAVONIA-STEPHENS CL 12Y080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): .00/.00000 MANAGER: M. REYNOLDS
STATUS:
PE NONE $
0
CONG DIST. 10
ROW NONE $
0
CONST 1998
$
500
FUND SOURCE: I-STATE MAINT.
FED SHARE $
450
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
50
122080 IS AN ASSOCIATED PROJECT.
OTH SHARE $
FRANKLIN SR 145 @ NORTH FORK BROAD RIVER NORTH OF CARNESVILLE 141990 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .19/.30571
MANAGER: L. OWENS STATUS: FRANKLIN COUNTY SIGNED FOR UTILITIES 3-24-95
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW 1999 CONST
UNDERWAY
$
20
AFTER 99
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
~--~
1(-~..::..:~;'J
~~)'
\'2:::~-=-""'-I'-1
~)-:'~r..:.::-,.,
cr~-:.:..=_'P
~-c.~_':",'t;')'
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
GEORGIA MOUNTAINS
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
HABERSHA SR 17 FR 3-LANE @ SUTTON MILL CK TO SR 115 122440 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
LENGTH(Miles/km): 1.00/1.60900 MANAGER: L. OWENS
STATUS:
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 108
FISCAL YEAR
COST ESTS
PE 1993
ROW 1999 CONST
UNDERWAY
$ 243 AFTER 99
HABERSHA SR 105 EB MP 6.95-8.0; WB 8.25-9.15 . . . GOES W/122455 122450 ADDITION OF A PASSING LANE.
LENGTH(Miles/km): 2.05/3.29845 MANAGER: L. OWENS STATUS: HABERSHAM SGN DO UTIL 4-15-96;REQ DEMOREST DO P UTIL 3-29-96
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW 1998 CONST
UNDERWAY
$ 252 AFTER 99
HABERSHA SR 105/US 441 B FM MAIN ST NW TO SR 365 [& 1-WAY PAIR] 132100 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1.63/2.62267 MANAGER: L. OWENS STATUS: REQ COUNTY 9-5-90 DO UTIL; CITY/CORNELIA SGN 9/14/90 UTIL.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1997 CONST
UNDERWAY $ 865 AFTER 99
HABERSHA SR 115@ CHATTHAOOCHEE RIVER 7.5 MI E. OF CLEVELAND/WHITE 13256X REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): 1.00/1.60900 MANAGER: UNKNOWN STATUS:
HABERSHA SR 115 @ YELLOWBANK CREEK 3.7 MILES NW OF DEMOREST 132600 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .10/.16090 MANAGER: L. OWENS STATUS: HABERSHAM COUNTY SIGNED FOR UTILITIES 4-10-95
CONG DIST. 0 & 0 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 132560 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
HABERSHA CR 240/CR 81/LOW GAP RD FM CR 245 TO CR 80/RABUN
171380 MINOR WIDEN & RESURF / RECST. OR REHAB.
CONG DIST. 9
LENGTH(Miles/km): 4.82/7.75538- EXIST. LANES: 1 /PROPOSED LANES: 1
MANAGER: L. OWENS
FUND SOURCE: FED. LANDS
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
17138X IS AN ASSOCIATED PROJECT.
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE 1996 UNDERWAY
ROW 1998 $
10
CONST 1999 $ 166
FED SHARE $
133
GA. SHARE $
33
OTH SHARE $
PE 1997 ROW NONE CONST
$
10
$
0
AFTER 99
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 109
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
GEORGIA MOUNTAINS
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
HALL
I-985 SPLIT DIAMOND INTERCHANGE @ SR 13 & SR 53 & CD SYSTEM
PE 1993
UNDERWAY
110400 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 9
ROW 1998
$ 1000
LENGTH(Miles/km): 3.10/4.98790 - EXIST. LANES: 4 /PROPOSED LANES: 4
CONST
AFTER 99
MANAGER: J. GARLAND
FUND SOURCE: NAT'L HIGHWAY
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
HALL 110465
STATUS:
I-985 @ SR 11 1 NB EXIT LOOP & SB EXIT INTERCHANGE / RECST. OR REHAB.
CONG DIST. 9
LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: J. GARLAND
FUND SOURCE: NAT'L HIGHWAY
REQ CO & GAINESVILLE DO UTIL 2-8-96.
FEDERAL HIGHWAY ADMIN FUNDS
HALL 110470
STATUS:
I-985 @ SPOUT SPRINGS ROAD TURN LANES / SAFETY LENGTH(Miles/km): .34/.54706 - EXIST. LANES: 4 /PROPOSED LANES: MANAGER: L. OWENS REQ HALL & FLOWERY BRANCH DO UTILITIES 3-20-96.
CONG DIST. 9 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
HALL 12215X
STATUS:
SR 11/US 129 FM S4 332/JACKSON TO SR 323 ... SEE UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: TONY DUKE
JACKSONCO /PROPOSED LANES:
CONG DIST. 0 & 0 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122150 IS AN ASSOCIATED PROJECT.
HALL 132610
STATUS:
SR 60, WIDEN TO PROVIDE 2-WAY LEFT TURN IN MURRAYVILLE RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. LENGTH(Miles/km): 1.10/1.76990
MANAGER: L. OWENS REQ HALL DO UTILITIES 3-20-96.
CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
$
20
ROW 1998
$
61
CONST 1999
$
669
FED SHARE $
535
GA. SHARE $ 134
OTH SHARE $
PE 1996 UNDERWAY
ROW 1997
$
140
CONST 1999
$
439
FED SHARE $
351
GA. SHARE $
88
OTH SHARE $
PE NONE
$
0
ROW NONE $
0
CONST NONE $
0
PE 1997 ROW 1999 CONST
$
60
$ 105
AFTER 99
HALL 132690
STATUS:
SR 11/US 129 AT JIM HOOD ROAD/NOPONE ROAD
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 9
LENGTH(Miles/km): .20/.32180- EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: J. GARLAND
FUND SOURCE: HWY. SAFETY
REQ HALL DO ROW & UTIL 7/11/96.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW LOCL CONST
$
20
AFTER 99
HALL 171060
STATUS:
RESTORE FLOWERY BRANCH RAILROAD DEPOT
HISTORIC FACILITIES / ENHANCEMENT
CONG DIST. 9
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BRENT COOK
FUND SOURCE: TRANS, ENHANCE.
LGPA TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96, (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW NONE
$
0
CONST 1997
$
250
FED SHARE $ 200
GA. SHARE $
OTH SHARE $
50
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 110
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
GEORGIA MOUNTAINS
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
HALL
CONSTRUCT PEDESTRIAN/BIKE PATH SYSTEM IN GAINESVILLE
PE LOJ:L
171370 BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 9
ROW LOCL
LENGTH(Miles/km): 10.00/16.09000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1998
$ 1250
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
FED SHARE $ 1000
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
OTH SHARE $
250
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
GEORGIA MOUNTAINS
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
HART 132160
STATUS:
SR 77 FM SR 51 TO SR77C;FM MP 13.72-15.0;WB MP 12.0-17.0 ADDITION OF A PASSING LANE.
LENGTH(Miles/krn): 5.20/8.36680 MANAGER: L. OWENS HART COUNTY SGN 1-12-93 FOR UTILITIES
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
HART 132540
STATUS:
SR 8/US 29 AT HART INDUSTRIAL PARK/GOLF COURSE ROAD
INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/krn): .50/.80450- EXIST. LANES: 3 /PROPOSED
MANAGER: L. OWENS HARTWELL & COUNTY JOINTLY SGN FOR $50K 2-13-96.
LANES:
CONG DIST. 10
4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
HART 141850
STATUS:
SR 51 AT CR 503 AND CR 405
TURN LANES / SAFETY
CONG DIST. 10
LENGTH(Miles/krn): .50/.80450- EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: L. OWENS
FUND SOURCE: HWY. SAFETY
HART COUNTY SIGNED 5-19-94 FOR ROW & UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
HART 170843
STATUS:
C~ 245 @ SHOAL CREEK 6.5 MI NE OF BOWERSVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
LENGTH(Miles/krn): .22/.35398
MANAGER: L. OWENS HART SGN 10-18-93 FOR ROW, UTILITIES & DETOURS
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 111
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1996 UNDERWAY
CONST 1998 $ 2893
FED SHARE $ 2314
GA. SHARE $
579
OTH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1999
$
500
FED SHARE $
450
GA. SHARE $
50
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
787
FED SHARE $ 708
GA. SHARE $
79
OTH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1997
$
481
FED SHARE $ 385
GA. SHARE $
96
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTA'riON
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
GEORGIA MOUNTAINS
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
LUMPKIN 170900
STATUS:
CR 213 OVER WATERS/DICKS CREEK BRIDGES / REPLACEMENT LENGTH(Miles/km): .15/.24135 MANAGER: L. OWENS LUMPKIN SGN 3-19-92 ROW, UTILITIES AND DETOURS.
CONG DIST. 9
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
LUMPKIN 170910
STATUS:
HIGHTOWER CHURCH ROAD/CR 72 OVER ETOWAH RIVER BY FOREST HWY
BRIDGES / REPLACEMENT LENGTH(Miles/km): .10/.16090 MANAGER: L. OWENS LUMPKIN COUNTY SGN FOR ROW, UTILITIES & DETOURS 5-13-93
CONG DIST. 9
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 112
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW LOCL
CONST 1997
$
126
FED SHARE $ 126
GA. SHARE $
OTH SHARE $
PE 1993 UNDERWAY
ROW LOCL
CONST 1997
$
463
FED SHARE $ 463
GA. SHARE $
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
GEORGIA MOUNTAINS
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
RABUN 171371
STATUS:
PEDESTRIAN TRAIL ALONG TALLULAH FALLS RR AND LANDSCAPING
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 9
LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
RABUN 17138X
STATUS:
CR 140/CR 81/LOW GAP RD FM CR 245 TO CR SO/HABERSHAM MINOR WIDEN & RESURF / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 1 /PROPOSED MANAGER: UNKNOWN
LANES:
CONG DIST. 0 & 0 1
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS 171380 IS AN ASSOCIATED PROJECT.
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 113
FISCAL YEAR
COST ESTS
PE LOCL
ROW LOCL
CONST 1998
$
250
FED SHARE $ 200
GA. SHARE $
OTH SHARE $
50
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY ROC FY 1997/FY 1999
Page 114
COUNTY
DESCRIPTION
GEORGIA MOUNTAINS
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
STEPHENS SR 365/TOCCOA BYP EXT @ SR 17 NEON NEW LOC TO SR 365@CR 311 132440 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
LENGTH(Miles/km): 5.72/9.20348
CONG DIST. 9
PE 1997 ROW CONST
$
50
AFTER 99
AFTER 99
MANAGER: J. HOBBS
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
STEPHENS CR 16/YOW MILL ROAD @ EASTANOLLEE CREEK 1.9 MIN OF AVALON 170833 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
LENGTH(Miles/km): .20/.32180
MANAGER: L. OWENS STATUS: STEPHENS SGN DO ROW, UTILITIES & DETOURS 10-19-93
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1994
UNDERWAY
ROW LOCL
CONST 1997
$
485
FED SHARE $
388
GA. SHARE $
97
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 115
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
GEORGIA MOUNTAINS
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
TOWNS
SR 2/US 76 3 MILES SE/HIAWASSEE @ HIAWASSEE RIVER
PE 1997 UNDERWAY
122230 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 9
ROW 1999 $
6
LENGTH(Miles/km): .50/.80450
CONST
AFTER 99
MANAGER: L. OWENS
FUND SOURCE: BRIDGE PROGRAM
STATUS: TOWNS SGN FOR UTILITIES 8-29-96.
FEDERAL HIGHWAY ADMIN FUNDS
TOWNS 122420
STATUS:
SR 515/US 76 FM CR 207/PINECREST RD TO CR 124 RECONSTRUCTION & WIDENING FROM 3 LANES TO 4 LANES. LENGTH(Miles/km): 2.60/4.18340 MANAGER: L. OWENS
REQ TOWNS COUNTY DO UTILITIES 5/22/96.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
TOWNS 171372
STATUS:
TRAIL CONNECTING BRASSTOWN BALD, YOUNG HARRIS AND COLLEGE BICYCLE/FED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: TO BE DONE BY CONTRACT
CONG DIST. 9 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW 1997
$
50
CONST 1997
$ 1761
FED SHARE $ 1409
GA. SHARE $ 352
OTH SHARE $
PE LOCL
ROW LOCL
CONST 1998
$
125
FED SHARE $
100
GA. SHARE $
OTH SHARE $
25
l>Lo. --
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
GEORGIA MOUNTAINS
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
WHITE 121740
STATUS:
SR 17 FM S OF SR 356 TON OF SR 75 ALT TURN LANES / RECST. OR REHAB. LENGTH(Miles/km): .35/.56315- EXIST. LANES: 2 /PROPOSED LANES: MANAGER: L. OWENS
WHITE SGN 10/93 IF CITY PAYS;HELEN HAS NO INVOLVED UTILITIES
CONG DIST. 9 3
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
WHITE 132560
STATUS:
SR 115@ CHATTHAOOCHEE RIV 7,5 MI E. OF CLEVELAND/HABERSHAM REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007
MANAGER: L. OWENS COUNTY SGN 12-6-94 PROVIDING OWNER PAYS AND NOT COUNTY.
WHITE 170881
STATUS:
CS 613/LORELY RD OVER CHATTAHOOCHEE RIVER IN HELEN REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
LENGTH(Miles/km): ,10/.16090 MANAGER: L. OWENS HELEN SGN ROW & UTIL 3-4-93;WHITE NO INVOLVED UTILITIES.
CONG DIST, 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 13256X IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
WHITE 171020
STATUS:
SAUTEE-NACOOCHEE VALLEY GREENWAYS; P.O. REHAB; LANDSCAPING BICYCLE/FED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT
CONG DIST. 9
0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 116
FISCAL YEAR
COST ESTS
PE 1996 UNDERWAY
ROW 1990 UNDERWAY
CONST 1998 $ 392
FED SHARE $ 353
GA. SHARE $
39
OTH SHARE $
PE 1997
$
19
ROW 1998 $
20
CONST 1999
$
818
FED SHARE $ 654
GA. SHARE $ 164
OTH SHARE $
PE 1993 UNDERWAY
ROW LOCL
CONST 1998 $ 306
FED SHARE $ 245
GA. SHARE $
61
OTH SHARE $
PE 1997
$
25
ROW 1997
$
312
CONST 1997
$
375
FED SHARE $ 300
GA. SHARE $
OTH SHARE $
75
HEART OF GEORGIA- ALTAMAHA REGIONAL DEVELOPMENT CENTER
Appling Bleckley Candler Dodge Evans Jeff Davis Laurens Montgomery Pulaski Tattnall Telfair Toombs Treutlen Wayne Wheeler Wilcox
0 SCALE IN MILES
HEART OF GEORGIA- ALTAMAHA
RDc change effective 7~1~96
""''
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
HEART OF GEORGIA - ALTAMAH
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
APPLING 522900
STATUS:
DISTRICT FIVE--UPGRADE GUARDRAIL ON NH SYSTEM @ VARIOUS LOCA
GUARDRAIL / MAINTENANCE
CONG DIST. 1 & 8
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 117
FISCAL YEAR
COST ESTS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
11
FED SHARE $
9
GA. SHARE $
2
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 118
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
HEART OF GEORGIA - ALTAMAH
FISCAL
COST
-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BLECKLEY SR 112: OVER BOLLINGER CREEK; IMPROVE CR 77 FOR DETOUR
PE 1995 UNDERWAY
242160 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 8
ROW 1997 $
10
LENGTH(Miles/km): 2.30/3.70070
CONST 1997
$
939
MANAGER: D. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 751
STATUS: BLECKLEY SGN DO UTIL 3-13-96.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
188
OTH SHARE $
BLECKLEY SR 112: DRAINAGE IMPROVEMENTS FM GUM SWAMP CREEK TO CR 88
242165 MISCELLANEOUS IMPROVEMENTS / RECST. OR REHAB.
CONG DIST. 8
LENGTH(Miles/km): 1.06/1.70554- EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GRIFFITH
FUND SOURCE: SURFACE TRANSPORT.
STATUS: BLECKLEY REF UTILITIES 3-13-96. (Y)
FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 $
10
ROW 1997
$
30
CONST 1997
$
503
FED SHARE $ 402
GA. SHARE $ 101
OTH SHARE $
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
12f._
't>
~'"'-~:;.!
~...:;;: .~~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
HEART OF GEORGIA - ALTAMAH
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DODGE 221975
STATUS:
NW EASTMAN BYP/SR 841 FM US 341/SR 27 NE TO US 23/SR 87 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 1.90/3.05710 MANAGER: B. FERGUSON
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 119
FISCAL YEAR
COST ESTS
PE 1999 ROW LOCL CONST
$
51
AFTER 99
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 120
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
HEART OF GEORGIA - ALTAMAH
FISCAL
COST
-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EVANS SR 73/US 301 FM TATTNALL CO LINE TO S CL/CLAXTON
PE 1993 UNDERWAY
522005 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 1
ROW 1996 UNDERWAY
LENGTH(Miles/krn): 6.75/10.86075
CONST 1997 $ 6050
MANAGER: TONY COLLINS
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 4840
STATUS: REQ TATTNALL P UTL 9/91;SGN EVANS 10/91 UTL/CLAXTON 7/93 P.U
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1210
OTH SHARE $
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 121
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
HEART OF GEORGIA - ALTAMAH
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-STS
JEFF DAV SR 19 FM McCLOUD RD/CR 321 TO NORTH OF McCLOUD CIR/CR 146
PE 1993 UNDERWAY
522660 TURN LANES / SAFETY
CONG DIST. 8
ROW 1996 UNDERWAY
LENGTH(Miles/km): .60/.96540- EXIST. LANES: 2 /PROPOSED LANES: 3
CONST 1997 $ 398
MANAGER: TONY COLLINS
FUND SOURCE: HWY. SAFETY
FED SHARE $ 358
STATUS: JEFF DAVIS SIGNED FOR UTILITIES 3-11-93.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
40
OTH SHARE $
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 122
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
HEART OF GEORGIA - ALTAMAH
FISCAL
COST
-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
LAURENS I-16 AT TURKEY CK, PUGHES CK & MERCER CK
PE 1994 UNDERWAY
210660 BRIDGES / RECST. OR REHAB.
CONG DIST. 8
ROW NONE
$
0
LENGTH(Miles/km): 1.00/1.60900
CONST 19"99
$ 2020
MANAGER: KEVIN HOSEY
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 1818
STATUS: REQ LAURENS COUNTY DO UTILITIES 10-5-93
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 202
OTH SHARE $
LAURENS 221540
STATUS:
SR 19 WB MP MP 29.38/W CL DUDLEY TOW/TURKEY CRK/MP 30.73 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 1.35/2.17215 MANAGER: D. GRIFFITH
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW CONST
$
11
AFTER 99
AFTER 99
LAURENS 221810
STATUS:
SR 19/DUBLIN FM MULTI-LN @ INDUSTRIAL BLVD NW TO S-1641&CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 1.91/3.07319 MANAGER: K. FULBRIGHT REQ LAURENS CO 10-11-90;DUBLIN SGN 2/1/91 CITY UTILITIES
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
LAURENS 232005
STATUS:
SR 31/US 319 ACEL-DECEL LANES AT EAST LAURENS SCHOOL
ACCELERATION/DECEL LANE / SAFETY
CONG DIST. 8
LENGTH(Miles/km): .20/.32180- EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GRIFFITH
FUND SOURCE: HWY. SAFETY
REQ LAURENS DO ROW & UTIL 7/11/96.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1997
$
145
CONST 1999
$ 2319
FED SHARE $ 1855
GA. SHARE $
464
OTH SHARE $
PE 1997 ROW 1999 CONST
$
5
$
2
AFTER 99
LAURENS 262570
STATUS:
RELOCATION OF SR 257 ALONG JOINER ST/CS 702 IN MINOR WIDEN & RESURF / RECST. OR REHAB. LENGTH(Miles/km): .30/.48270- EXIST. LANES: 2
MANAGER: D. GRIFFITH REQ CITY OF DUBLIN DO ROW & UTILITIES 10-31-95
DUBLIN /PROPOSED
LANES:
CONG DIST. 8 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
LAURENS 271000
STATUS:
NATHANIEL DRIVE FROM SR 26 TO SR 199 IN EAST DUBLIN RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 3.42/5.50278 MANAGER: D. GRIFFITH REQ COUNTY DO ROW/UTL 11/94; CITY SGN 12-1-94 FOR ROW/UTIL
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1997
$
21
ROW LOCL
CONST 1999
$
504
FED SHARE $
403
GA. SHARE $
101
OTH SHARE $
PE 1995 UNDERWAY
ROW LOCL
CONST 1997
$ 3633
FED SHARE $ 2906
GA. SHARE $
727
OTH SHARE $
a: -~ '
L:.
'..:::
t:_:>::-"-"=.i!
~~!..::':'.";)
GEORGIA DEPARTMENT OF TRANSPORTATION
20-sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 123
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
HEART OF GEORGIA - ALTAMAH
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
MONTGOME SR 292/VIDALIA FM MORN'SIDE TO LOWERY W/RIGHT TURN;WILSON RD
PE 1995 UNDERWAY
550610 TURN LANES / RECST. OR REHAB.
CONG DIST. 1
ROW LOCL
LENGTH(Miles/km): .96/1.54464 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST 1998
$
846
MANAGER: TONY COLLINS STATUS: MONTGOMERY SGN R/U 1/96;TOOMBS SGN 10/95;VIDALIA SGN 10/95.
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 761
GA. SHARE $
85
55061X IS AN ASSOCIATED PROJECT.
OTH SHARE $
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
HEART OF GEORGIA - ALTAMAH
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
PULASKI 331620
STATUS:
SR 230 @ SOUTH PRONG BIG TUCSAWHATCHEE CRK W/HAWKINSVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .61/.98149 MANAGER: GORDON BROWN PULASKI REFUSED 10-5-92.
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PULASKI 332030
STATUS:
SR 11/US 341 OVER TOWN CREEK NORTH OF HAWKINSVILLE REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 3 LANES. LENGTH(Miles/km): .02/.03218 MANAGER: B. FERGUSON DOT TO PAY 6/4/96;SEE 322170
PULASKI 343000
STATUS:
SR 230 @ BIG CREEK 5.6 MILES WEST OF HAWKINSVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450
MANAGER: GORDON BROWN PULASKI SGN FOR UTILITIES 12-19-94
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322170 IS AN ASSOCIATED PROJECT.
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 124
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY ROW 1996 UNDERWAY
CONST 1998 $ 1030 FED SHARE $ 824 GA. SHARE $ 206 OTH SHARE $
PE NONE $
0
ROW NONE $
0
CONST 1998 $ 326
FED SHARE $ 261
GA. SHARE $
65
OTH SHARE $
PE 1996 UNDERWAY
ROW 1998
$
34
CONST 1999 $ 1453
FED SHARE $ 1162
GA. SHARE $ 291
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
20-Sep-1996 Page 125
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
HEART OF GEORGIA - ALTAMAR
FISCAL
COST
-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
TATTNALL SR 73/US 301 FM N CL/GLENNVILLE TO EVANS CO LINE 522000 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 7.16/11.52044
CONG DIST. 1
PE 1992 ROW 1996 CONST 1997
UNDERWAY UNDERWAY $ 6792
MANAGER: TONY COLLINS STATUS: SIGNED TATTNALL 6/95 & EVANS 10/91 UTIL; CITY 10-8-91 P.UTIL
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 5434 GA. SHARE $ 1358
OTH SHARE $
TATTNALL SR 30/US 280: OVER THOMAS CREEK NE OF REIDSVILLE 522620 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS STATUS: TATTNALL COUNTY SIGNED FOR UTILITIES 11-14-95
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY
ROW 1997
$
2
CONST 1998 $ 420
FED SHARE $ 336
GA. SHARE $
84
OTH SHARE $
TATTNALL SR 196 OVER BEARD'S CREEK & LONG COUNTY 541960 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS STATUS: LONG REF UTILITIES 10-5-94;TATTNALL NO UTILTIES 3-20-96.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 54196X IS AN ASSOCIATED PROJECT.
PE 1994 UNDERWAY
ROW 1997
$
6
CONST 1998 $ 759
FED SHARE $ 607
GA. SHARE $
152
OTH SHARE $
TATTNALL MIDWAY RD/CR 79 @ CEDAR CREEK 2 MI NORTH OF COLLINS 571180 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: TONY COLLINS STATUS: CO SGN FOR ROW, UTIL & DETOURS 2-23-96.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
10
AFTER 99
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1997/FY 1999
Page 126
COUNTY
DESCRIPTION
HEART OF GEORGIA - ALTAMAH
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA---------R--EG--IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
TELFAIR SR 30/US 280 @ TURNPIKE CREEK 1.2 MI E OF MILAN
PE 1994 UNDERWAY
532560 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 8
ROW 1996 UNDERWAY
LENGTH(Miles/km): .23/.37007
CONST 1997
$
680
MANAGER: TONY COLLINS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
544
STATUS: TELFAIR COUNTY SIGNED FOR UTILITIES 11-16-93
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 136
OTH SHARE $
TELFAIR 542045
STATUS:
SR 149 @ SUGAR CREEK 5 MI SE OF MCRAE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: TONY COLLINS TELFAIR SIGNED FOR UTILITIES 5-16-95
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW 1999 CONST
UNDERWAY
$
11
AFTER 99
TELFAIR 542050
STATUS:
SR 149 @ TURNPIKE CREEK 8 MI SE OF MCRAE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007
MANAGER: TONY COLLINS TELFAIR SGN FOR UTILITIES 5-16-95NLY 5-8-95
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1997 ROW 1999 CONST
UNDERWAY
$
11
AFTER 99
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
HEART OF GEORGIA - ALTAMAH
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
TOOMBS 522320
STATUS:
SR 30 FM MORNINGSIDE TO BROAD FOOT/NOBLE ST (& 1-WAY PAIR) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 2.15/3.45935 MANAGER: J. GRAYBEAL REQ TOOMBS DO PUB UTILILIES 11/93;VIDALIA SGN UTIL 11-15-93
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 127
FISCAL YEAR
COST ESTS
PE 1992 ROW 1997 CONST
UNDERWAY $ 473 AFTER 99
TOOMBS 532400
STATUS:
CR 364/0LD RIVER RD OVER WILLIAMS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225
MANAGER: UNKNOWN TOOMBS SGN DO ROW, UTILITIES AND DETOURS 6-29-92
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TOOMBS 55061X
STATUS:
SR 292 IMPROVE FM WILSON TO LOWERY & TURN LNS;
UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 MANAGER: UNKNOWN
SEE MONTGOMER /PROPOSED LANES:
CONG DIST. 0 & 0 0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 550610 IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.
PE 1995
UNDERWAY
ROW LOCL
CONST 1999
$
345
FED SHARE $ 276
GA. SHARE $
69
OTH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
HEART OF GEORGIA - ALTAMAH
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
TREUTLEN I-16 AT OVERPASS FOR GEORGIA CENTRAL RAILWAY
210610 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): 1.00/1.60900 MANAGER: KEVIN HOSEY
STATUS: TREUTLEN COUNTY SIGNED 12-7-93 FOR UTILITIES
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
TREUTLEN REPLACE GA CENTRAL RR BRIDGE OVER 29 & RELOCATE CR 94 222200 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .40/.64360 MANAGER: D. GRIFFITH STATUS: TREUTLEN SIGNED FOR UTILITIES 6-12-95
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TREUTLEN SR 171 @ THIGPEN MILL CREEK NE/SOPERTON 231140 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .10/.16090 MANAGER: D. GRIFFITH STATUS: COUNTY SIGNED FOR UTILITIES 6-7-94
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TREUTLEN SR 171 @ OHOOPEE RIVER AND OVERFLOW NE/SOPERTON; SEE EMANUEL 23114X REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .10/.16090 MANAGER: UNKNOWN STATUS: SEE 231140
CONG DIST. 0 & 0
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 231145 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 128
FISCAL YEAR
COST ESTS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1998 $ 1257
FED SHARE $ 1131
GA. SHARE $
126
OTH SHARE $
PE 1993 UNDERWAY
ROW 1995 UNDERWAY
CONST 1997
$ 1825
FED SHARE $ 1460
GA. SHARE $ 365
OTH SHARE $
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1998 $ 250
FED SHARE $ 200
GA. SHARE $
50
OTH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
HEART OF GEORGIA - ALTAMAH
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
WHEELER 531250
STATUS:
REPLACE TRUSS SECTION @ OCONEE RIVER ON SR 46 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS LGPA NOT APPLICABLE
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 129
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1999
$
BOO
FED SHARE $
640
GA. SHARE $
160
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 130
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
HEART OF GEORGIA - ALTAMAH
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
WILCOX SR 30/US 280: OVER MILL CREEK WEST OF ROCHELLE
PE 1995 UNDERWAY
422310 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 8
ROW 1998
$
1
LENGTH(Miles/km): 1.00/1.60900
CONST 1999 $ 460
MANAGER: J. SHEFFIELD
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 368
STATUS: WILCOX SGN DO UTIL 12-5-95;NO UTILITY RELOCATION 11-28-95.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
92
OTH SHARE $
WILCOX 431690
STATUS:
SR 30/US 280@ ALAPAHA RIVER TRIB. 0.7 MI W OF PITTS REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: J. SHEFFIELD WILCOX COUNTY SGN TO DO UTILITIES 2-6-96.
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW CONST
$
10
AFTER 99
AFTER 99
WILCOX 431695
STATUS:
SR 30/US 280 @ ALAPAHA RIVER 1.2 MI W OF PITTS REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: J. SHEFFIELD WILCOX SGN DO UTILITIES 2-6-96.
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1998 ROW CONST
$
10
AFTER 99
AFTER 99
~
L
LOWER CHATTAHOOCHEE REGIONAL DEVELOPMENT CENTER
Chattahoochee Clay Harris
Muscogee Quitman Randolph Stewart
Talbot
:
r
~--
L. ---
c __j
"- .__)
Bartletts Forvr,;" Lake
LEE Goat
10 0
10
SCALE IN MILES
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 131
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
LOWER CHATTAHOOCHEE
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-ST-S---
CHATTAHO SR 1 @ HICHITEE CREEK
PE 1990 UNDERWAY
321580 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 2
ROW NONE
$
0
LENGTH(Miles/km): .30/.48270
CONST 1999
$
865
MANAGER: M. REYNOLDS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
692
STATUS: NO UTILITY COST INVOLVED; LGPA NOT APPLICABLE.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
173
OTH SHARE $
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
LOWER CHATTAHOOCHEE
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CLAY 442710
STATUS:
SR 39 @ CEMOCHECKOBEE CREEK IN FORT GAINES REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: J. SHEFFIELD REQ FT GAINES DO UTIL 3-11-96(Y);CLAY NO INVOLVED UTILITIES.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 132
FISCAL YEAR
COST ESTS
PE 1997 UNDERWAY
ROW 1998
$
2
CONST 1999
$
798
FED SHARE $
638
GA. SHARE $ 160
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 133
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
LOWER CHATTAHOOCHEE
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
HARRIS 332310
SR 1/US 27@ MULBERRY CREEK .7 MIN OF JCT SR 208 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450 MANAGER: GORDON BROWN
CONG DIST. 3 FUND SOURCE: BRIDGE PROGRAM
PE 1996 UNDERWAY
ROW 1998
$
40
CONST 1999
$ 1393
FED SHARE $ 1114
STATUS: HARRIS SGN 12-6-94 FOR UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 279
OTH SHARE $
HARRIS 342780
STATUS:
SR 1/US 27 @ SR 354 IN PINE MOUNTAIN INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .57/.91713- EXIST. LANES: 0 /PROPOSED MANAGER: GORDON BROWN COUNTY SGN 2-12-92 FOR ROW & UTILITIES (OTO PROJECT)
LANES:
CONG DIST. 3 0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW LOCL
CONST 1997
$
631
FED SHARE $
568
GA. SHARE $
63
OTH SHARE $
HARRIS 371220
STATUS:
CR 268/DAVIS LAKE RD@ CRAWFORD CREEK JUST E OF PINE MOUNTAIN
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: GORDON BROWN HARRIS CO SGN ROW, UTILITIES & DETOURS 9-7-93
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW LOCL
CONST 1998
$
388
FED SHARE $
310
GA. SHARE $
78
OTH SHARE $
HARRIS 371456
STATUS:
MOUNTAIN HILL SCHOOLHOUSE @ SR 219 & CR 385
HISTORIC PRESERVATION / ENHANCEMENT
CONG DIST. 3
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: H. SUTHERLAND
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW LOCL
CONST 1997
$
231
FED SHARE $ 185
GA. SHARE $
OTH SHARE $
46
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 134
PROJECT LISTING BY RDC FY 1997IFY 1999
COUNTY
DESCRIPTION
LOWER CHATTAHOOCHEE
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
MUSCOGEE PUBLIC TRANSIT SERVICE FOR COLUMBUS AND MUSCOGEE COUNTY
3D3019 TRANSIT PROJECTS I OPERATIONS
CONG DIST. 3 & 2
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM
OPERATING 1997
$ 2310
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
FED SHARE $ 514
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $ 1796
MUSCOGEE TIRE LEAS.,EQUIP.RBLD.,TRANSIT VCH.,OFF.FURN.,TRANS.REBLD.,
3D3020 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS:
CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$ 884
FED SHARE $
707
GA. SHARE $
88
OTH SHARE $
88
MUSCOGEE TIRE LEAS.,EQUIP.REHB.,TRANSIT VCH.,TRUCKS,FUEL BAY,COMP.ASC
3D3023 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: COLUMBUS TRANSIT SYSTEM
MANAGER: STEVE KISH
STATUS:
CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$ 928
FED SHARE $ 742
GA. SHARE $
93
OTH SHARE $
93
MUSCOGEE PUBLIC TRANSIT FOR COLUMBUS AND MACON COUNTY
3D3024 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: COLUMBUS TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:
CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
2310 329
1981
MUSCOGEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
3V7020 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN COLUMBUS MPO AREA MANAGER: STEVE KISH
STATUS:
CONG DIST. 3 & 2
CAPITAL 1997
$
40
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
32
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
4
OTH SHARE $
4
MUSCOGEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 3V7023 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN MUSCOGEE MPO AREA MANAGER: STEVE KISH
STATUS:
CONG DIST. 3 & 2
CAPITAL 1998
$
42
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
34
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
4
OTH SHARE $
4
MUSCOGEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
3V7030 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN COLUMBUS MPO AREA MANAGER: STEVE KISH STATUS:
CONG DIST. 3 & 2
CAPITAL 1999
$
44
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
35
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
5
OTH SHARE $
4
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
LOWER CHATTAHOOCHEE
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
MUSCOGEE TIRE LSNG.,ENG.REBD.,TRNS.RBD.,TRNST VCH.,COMP.ASSC.,FUEL SY 8D0001 TRANSIT PROJECTS / CAPITAL
FUNDS RECIPIENT: MANAGER: STEVE KISH STATUS: PLANNING
CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
20-Sep-1996 Page 135
FISCAL YEAR
COST ESTS
CAPITAL 1999
$ 940
FED SHARE $ 752
GA. SHARE $
94
OTH SHARE $
94
MUSCOGEE METRA(COLUMBUS) TRANSIT SVC 8D0002 TRANSIT PROJECTS / OPERATIONS
FUNDS RECIPIENT: METRA (COLUMBUS) MANAGER: STEVE KISH
STATUS:
TRANSIT SERVI
CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1999 $ FED SHARE $ GA. SHARE $ OTH SHARE $
2310 329
1981
MUSCOGEE I-185 BR WDN & CORRECT S CURVE @ CUSSETA RD & SCL RR 311155 BRIDGES / RECST. OR REHAB.
LENGTH(Miles/km): .75/1.20675 MANAGER: KEVIN HOSEY
STATUS: LGPA NOT APPLICABLE
COLUMBUS TIP # 91-ST-2001 CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 311770 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW 1997
$
200
CONST 1998 $ 2541
FED SHARE $ 2287
GA. SHARE $ 254
OTH SHARE $
MUSCOGEE I-185/COLUMBUS FM SR 520 TO ST MARYS RD [EXCEP 0.43 MILE)
311445 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 2.83/4.55347
MANAGER: KEVIN HOSEY STATUS: MUSCOGEE SIGNED 5-9-95 FOR UTILITIES
COLUMBUS TIP # 91-ST-2001 CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 311770 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1998 $ 100
CONST 1999
$ 7656
FED SHARE $ 6125
GA. SHARE $ 1531
OTH SHARE $
MUSCOGEE I-185 INTERCHANGE AT SR 1
COLUMBUS TIP # 91-ST-2001
311630 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 2
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: M. REYNOLDS
FUND SOURCE: I-STATE MAINT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1998 CONST
UNDERWAY $ 2007 AFTER 99
MUSCOGEE I-185 OVER OLD CUSSETA ROAD/CR 62 311770 BRIDGES / RECST. OR REHAB.
LENGTH(Miles/km): 1.00/1.60900 MANAGER: KEVIN HOSEY STATUS: REQ COLUMBUS-MUSCOGEE DO UTILITIES 10-9-95
MUSCOGEE SR 1/US 27/4TH AVE/COLUMBUS OVER C OF GA RR 321810 BRIDGES / RECST. OR REHAB.
LENGTH(Miles/km): .25/.40225 MANAGER: D. CHURCH STATUS: MUSCOGEE COUNTY SIGNED 6/13/90 FOR UTILITIES.
COLUMBUS TIP # 91-st-2001 CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 311155 IS AN ASSOCIATED PROJECT.
COLUMBUS TIP # 86-UD-3001 CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE
$
0
ROW NONE $
0
CONST 1999
$
234
FED SHARE $ 211
GA. SHARE $
23
OTH SHARE $
PE 1992 UNDERWAY
ROW 1998
$ 3048
CONST 1999 $ 4958
FED SHARE $ 3966
GA. SHARE $ 992
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1997/FY 1999
20-Sep-1996 Page 136
COUNTY
DESCRIPTION
LOWER CHATTAHOOCHEE
FISCAL
COST
-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
MUSCOGEE SR 85/US 27A AT FLATROCK ROAD & COUNTY LINE ROAD
COLUMBUS TIP # 95-SR-2001
PE 1995 UNDERWAY
332160 ACCELERATION/DECEL LANE / SAFETY
CONG DIST. 3
ROW NONE $
0
LENGTH(Miles/km): .40/.64360- EXIST. LANES: 4 /PROPOSED LANES: 0
CONST 1999
$
402
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
FED SHARE $ 362
STATUS: MUSCOGEE SGN DO UTILITIES 8-1-96.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
40
OTH SHARE $
MUSCOGEE 13TH STREET BRIDGE OVER CHATTAHOOCHEE RIVER & 35Y260 350260 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 0 TO 4 LANES.
LENGTH(Miles/km): .43/.69187 MANAGER: A. ALEXANDER STATUS: CT REQ CITY INSTALL, MAINTAIN LIGHTING 9/95; NO OTHER UTIL
COLUMBUS TIP # 78-BR-1001 CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 35Y260 IS AN ASSOCIATED PROJECT.
PE 1976 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$ 7854
FED SHARE $ 3927
GA. SHARE $
OTH SHARE $ 3927
MUSCOGEE BUENA VISTA RD-PH II FM ANDREA DR TO SCHATULGA RD 350685 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 1.40/2.25260 MANAGER: A. ALEXANDER STATUS: CO SGN ROW, UTIL 4-27-88 & FOR SIDEWALKS & WALLS 3-5-96
COLUMBUS TIP # 86-SR-2005 CONG DIST. 3 & 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW LOCL
CONST 1998
$ 3918
FED SHARE $ 3134
GA. SHARE $ 409
OTH SHARE $ 375
MUSCOGEE SR 22 SPUR/MACON RD @ AUBURN AVE & BOXWOOD BLVD IN COLUMBUS 350690 INTERSECTION IMPROVEMENT / RECST. OR REHAB.
LENGTH(Miles/km): .25/.40225- EXIST. LANES: 4 /PROPOSED LANES: MANAGER: B. FERGUSON STATUS: MUSCOGEE REQ DO UTILITIES 4-30-96.
COLUMBUS TIP # 86-SR-1001 CONG DIST. 3 & 2
4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1998
$
755
FED SHARE $
604
GA. SHARE $
151
OTH SHARE $
MUSCOGEE FORREST RD FM MACON{+MACON IMPROV} TO WOODRUFF FARM/FLOYD RD 350780 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.14/3.44326
MANAGER: A. ALEXANDER STATUS: COLUMBUS/MUSCOGEE SGN DO UTIL & ACQUIRE ROW 2-15-96.
COLUMBUS TIP # 79-SR-2003 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1999
$ 5784
FED SHARE $ 4627
GA. SHARE $ 1157
OTH SHARE $
MUSCOGEE ST MARYS RD/CS 2108/COLUMBUS FM BUENA VISTA TO ROBIN RD 350790 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): .91/1.46419 MANAGER: BILL MOSKAL STATUS: COLUMBUS/MUSCOGEE SIGNED FOR ROW & UTILITIES 11-20-91.
COLUMBUS TIP # 79-SR-2020 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1999 $ 1763 FED SHARE $ 1410 GA. SHARE $ 353 OTH SHARE $
MUSCOGEE SR 22 SP/MACON RD FM WOODRUFF FARM RD/CR 99 TO SR 22/US 80 350870 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.43/5.51887 MANAGER: D. CHURCH STATUS: MUSCOGEE SGN DO UTILITIES 8-1-96.
COLUMBUS TIP # 93-BR-1002 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1992 UNDERWAY ROW 1998 $ 5034 CONST 1999 $ 6233
FED SHARE $ 4986
GA. SHARE $ 1247 OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 137
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
LOWER CHATTAHOOCHEE
FISCAL
COST
-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
MUSCOGEE SR 22 SP/MACON RD @ BULL CREEK
COLUMBUS TIP # 93-BR-1001
PE 1992
UNDERWAY
350875 REHAB. OF THE EXISTING BRIDGE{S). FROM 2 LANES TO 4 LANES.
CONG DIST. 3
ROW NONE $
0
LENGTH(Miles/km): .02/.03218
CONST 1999
$
489
MANAGER: D. CHURCH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
391
STATUS: MUSCOGEE SIGNED 5-9-95 FOR UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
98
OTH SHARE $
MUSCOGEE SR 22 SP FM REESE RD/CS 2111 TO WOODRUFF FARM RD/CR 99 350880 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1.67/2.68703 MANAGER: D. CHURCH
STATUS: REQ COLUMBUS-MUSCOGEE CONSOLIDATED GOVT DO UTIL 10-31-95
COLUMBUS TIP # 92-SR-2001 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1997
$ 2550
CONST 1999
$ 4887
FED SHARE $ 3910
GA. SHARE $
977
OTH SHARE $
MUSCOGEE SR 22SP AT BROWN AVENUE AND PEACOCK AVENUE
COLUMBUS TIP # 79-SR-2004
351000 INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 3
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: A. ALEXANDER
FUND SOURCE: HWY. SAFETY
STATUS: CONTACT TRAFFIC OPERATIONS
FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
$
5
ROW LOCL
CONST 1999
$
291
FED SHARE $ 262
GA. SHARE $
29
OTH SHARE $
MUSCOGEE FLAT ROCK RD @ US 80/BEAVER RUN RD; RELOC INT 350' EAST 351060 INTERSECTION IMPROVEMENT / SAFETY
LENGTH(Miles/km): .50/.80450- EXIST. LANES: 2 /PROPOSED
MANAGER: J. LEONI STATUS: COLUMBUS SGN CONTRACT FOR PE, ROW & UTILITIES 10-16-95
LANES:
COLUMBUS TIP # 93-SR-2002 CONG DIST. 3 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW LOCL
CONST 1997
$
528
FED SHARE $
422
GA. SHARE $
106
OTH SHARE $
MUSCOGEE WARM SPRINGS RAIL LINE FOR TRAIL AND TROLLEY IN COLUMBUS
COLUMBUS TIP # 96-0T-2001
371481 RR CORRIDORS / ENHANCEMENT
CONG DIST. 2 & 3
LENGTH(Miles/km): 12.00/19.30800 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW LOCL
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1250 1000
250
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
LOWER CHATTAHOOCHEE
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
QUITMAN 431290
STATUS:
SR 27 OVER TOBANNEE CREEK NORTH OF GEORGETOWN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): 1.00/1.60900 MANAGER: J. SHEFFIELD QUITMAN COUNTY SGN DO UTILITIES 11-15-95
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
QUITMAN 431520
STATUS:
SR 50 REALIGNMENT IN THE CITY OF GEORGETOWN INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .38/.61142- EXIST. LANES: 4 /PROPOSED LANES: MANAGER: J. SHEFFIELD GEORGETOWN SGN DO UTIL 3-25-96;QUITMAN SGN DO UTIL 7-8-96.
CONG DIST. 2 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
QUITMAN 442725
STATUS:
SR 39 @ SOAPSTONE CREEK 5 MI N OF GEORGETOWN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .22/.35398 MANAGER: J. SHEFFIELD QUITMAN SIGNED FOR UTILITIES 5-12-95
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 138
FISCAL YEAR
COST ESTS
PE 1995 UNDERWAY
ROW 1997
$
1
CONST 1998 $ 493
FED SHARE $
394
GA. SHARE $
99
OTH SHARE $
PE 1996 UNDERWAY
ROW 1998
$
182
CONST 1998
$
699
FED SHARE $
629
GA. SHARE $
70
OTH SHARE $
PE 1997 UNDERWAY
ROW 1998 $
2
CONST 1999 $ 581
FED SHARE $ 465
GA. SHARE $
116
OTH SHARE $
~---
-~
~--!..:J
'"'
lA: . . ..J
f.:___ :0
~;::-_' - '- "_]
V~--- . ' d
t? ._ _:;)
L:
COUNTY P. I. NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
LOWER CHATTAHOOCHEE
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
RANDOLPH CR 134 @ GEORGIA & ALABAMA RAILROAD 2 MI SE OF CUTHBERT
471060 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: J. SHEFFIELD
STATUS: RANDOLPH SIGNED 7-7-94 ROW, UTILITIES AND DETOURS
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 139
FISCAL YEAR
COST ESTS
PE 1995 UNDERWAY
ROW LOCL
CONST 1997 $ 530
FED SHARE $
424
GA. SHARE $ 106
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
LOWER CHATTAHOOCHEE
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
STEWART 371260
STATUS:
RESTORE RICHLAND DEPOT; BEDINGFIELD INN; SINGER-MOYE INDIAN
HISTORIC FACILITIES / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: H. SUTHERLAND LGPA TO BE DONE BY CONTRACT
CONG DIST. 2 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 140
FISCAL YEAR
COST ESTS
PE LOCL
ROW NONE $
0
CONST 1997
$
610
FED SHARE $
4BB
GA. SHARE $
OTH SHARE $ 122
~,:_;
i._E_:__ :~
t:::L::...-- ;_;
~J.::>_:._'.'bl
I.:L:::-''7"'--.....J
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
LOWER CHATTAHOOCHEE
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
TALBOT 371280
STATUS:
CR 17/GORMAN ROAD @ CSX RAILROAD N CITY LMT OF TALBOTTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: GORDON BROWN TALBOT SGN ROW/UTL/DETOURS 11/93;CITY SGN 9/93 ROW,UTL,DET'R
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 141
FISCAL YEAR
COST ESTS
PE 1994 UNDERWAY
ROW LOCL
CONST 1998
$
372
FED SHARE $ 298
GA. SHARE $
74
OTH SHARE $
LUMP SUM AREA Projects Applicable Statewide
COUNTY P. I . NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
LUMP SUM AREA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
ALL 1B9001
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 11 COUNTIES IN NORTHEAST GA TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 1B9002
STATUS:
RURAL PUBLIC TRANSIT SERVICES IN 11 COUNTIES/CITIES IN NE GA
TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 1B9003
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 11 COUNTIES/CITIES IN NE GA TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 1C9001
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 1C9002
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 1C9003
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 9 & 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 2B9001
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 22 COUNTIES/CITIES IN E. GA
TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 8 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 142
FISCAL YEAR
COST ESTS
OPERATING 1997
$
398
FED SHARE $ 231
GA. SHARE $
OTH SHARE $
167
OPERATING 1998
$
428
FED SHARE $ 248
GA. SHARE $
OTH SHARE $
180
OPERATING 1999
$
448
FED SHARE $ 260
GA. SHARE $
OTH SHARE $
188
CAPITAL 1997
$ 109
FED SHARE $
87
GA. SHARE $
11
OTH SHARE $
11
CAPITAL 1998
$ 105
FED SHARE $
84
GA. SHARE $
11
OTH SHARE $
11
CAPITAL 1999
$ 116
FED SHARE $
93
GA. SHARE $
12
OTH SHARE $
12
OPERATING 1997
$
905
FED SHARE $
525
GA. SHARE $
OTH SHARE $
380
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 143
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA---------R--EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
RURAL PUBLIC TRANSIT SERVICE IN 22 CITIES/COUNTIES IN E. GA.
2B9002 TRANSIT PROJECTS / OPERATIONS
CONG DIST. 8 & 11
FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
OPERATING 1998
$
950
FED SHARE $ 551
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $ 399
ALL 2B9003
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 22 CITIES/COUNTIES IN E. GA. TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 8 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1999
$
996
FED SHARE $ 578
GA. SHARE $
OTH SHARE $ 418
ALL 2C9001
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 8 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$ 456
FED SHARE $
365
GA. SHARE $
46
OTH SHARE $
46
ALL 2C9002
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 8 & 11
CAPITAL 1998
$
97
FUND SOURCE: RURAL TRANSIT
FED SHARE $
78
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
10
OTH SHARE $
10
ALL 2C9003
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC.
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 8 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1999
$ 394
FED SHARE $ 315
GA. SHARE $
39
OTH SHARE $
39
ALL 3B9001
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 14 COUNTIES/CITIES IN W. GA TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRNSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 2 & 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1997
$
560
FED SHARE $ 325
GA. SHARE $
OTH SHARE $ 235
ALL 3B9002
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 14 CITIES/COUNTIES IN W. GA. TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERTORS MANAGER: STEVE KISH
CONG DIST. 2 & 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
588
FED SHARE $ 341
GA. SHARE $
OTH SHARE $ 247
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
l...:..:'""c!:~/
a&...~~
IP""~./
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 144
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
RURAL PUBLIC TRANSIT SERVICE IN 14 CITIES/COUNTIES IN W. GA.
3B9003 TRANSIT PROJECTS / OPERATIONS
CONG DIST. 2 & 3
FUNDS RECIPIENT: RURAL PUBLIC TRANSIT PROVIDERS
OPERATING 1999
$
618
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE $ 358
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $ 259
ALL 3C9001
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 2 & 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$ 241
FED SHARE $ 193
GA. SHARE $
24
OTH SHARE $
24
ALL 3C9002
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 2 & 3
CAPITAL 1998
$
72
FUND SOURCE: RURAL TRANSIT
FED SHARE $
58
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
7
OTH SHARE $
7
ALL 3C9003
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 2 & 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1999
$ 149
FED SHARE $ 119
GA. SHARE $
15
OTH SHARE $
15
ALL 3V7026
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN MACON MPO AREA MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1999
$
44
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
35
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
4
OTH SHARE $
4
ALL 4B9000
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 12 COUNTIES - S.W. GA. TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 2 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1997 $ 202
FED SHARE $ 117
GA. SHARE $
OTH SHARE $
85
ALL 4B9001
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 12 COUNTIES - S.W. GA. TRANSIT PROJECTS / OPERATIONS FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 2 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
OPERATING 1998
$
212
FED SHARE $ 123
GA. SHARE $
OTH SHARE $
89
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 145
PROJECT LISTING BY ROC FY 1997IFY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
RURAL PUBLIC TRANSIT SERVICE IN 12 COUNTIES - S.W. GA.
4B9002 TRANSIT PROJECTS I OPERATIONS
CONG DIST. 2 & 8
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
OPERATING 1999 $ 223
FED SHARE $
129
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
94
ALL 4C9000
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC.
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 2 & 8
CAPITAL 1997
$
43
FUND SOURCE: RURAL TRANSIT
FED SHARE $
34
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
4.
OTH SHARE $
4
ALL 4C9001
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC.
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 2 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$ 151
FED SHARE $ 121
GA. SHARE $
15
OTH SHARE $
15
ALL 4C9002
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC.
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 2 & 8
CAPITAL 1999
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE $
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
2
OTH SHARE $
2
ALL 5B9000
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 7 COUNTIES - S.E. GA
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1997
$
217
FED SHARE $ 126
GA. SHARE $
OTH SHARE $
91
ALL 5B9001
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 7 COUNTIES - S.E. GA.
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
228
FED SHARE $ 132
GA. SHARE $
OTH SHARE $
96
ALL 5B9002
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 7 COUNTIES - S.E. GA.
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
OPERATING 1999
$
239
FED SHARE $
139
GA. SHARE $
OTH SHARE $
100
:..-)
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997IFY 1999
LUMP SUM AREA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
ALL 5C9000
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 5C9001
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 5C9002
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 1 & 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 6B9000
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 15 COUNTIES - N.W. GA. TRANSIT PROJECTS I OPERATIONS FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 6B9001
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 15 COUNTIES - N.W. GA. TRANSIT PROJECTS I OPERATIONS FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 6B9002
STATUS:
RURAL PUBLIC TRANSIT SERVICE IN 15 COUNTIES - N.W. GA. TRANSIT PROJECTS I OPERATIONS FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 6C9000
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 146
FISCAL YEAR
COST ESTS
CAPITAL 1997
$
70
FED SHARE $
56
GA. SHARE $
7
OTH SHARE $
7
CAPITAL 1998
$ 194
FED SHARE $ 155
GA. SHARE $
19
OTH SHARE $
19
CAPITAL 1999
$
57
FED SHARE $
46
GA. SHARE $
6
OTH SHARE $
6
OPERATING 1997 $ 807 FED SHARE $ 468
GA. SHARE $ OTH SHARE $ 339
OPERATING 1998
$
810
FED SHARE $ 470
GA. SHARE $
OTH SHARE $ 340
OPERATING 1999 $ 828 FED SHARE $ 480 GA. SHARE $
OTH SHARE $ 348
CAPITAL 1997
$
515
FED SHARE $
412
GA. SHARE $
52
OTH SHARE $
52
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997IFY 1999
LUMP SUM AREA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
ALL 6C9001
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 6C9002
STATUS:
VEHICLES, RADIOS, BASE STATIONS, COMPUTERS, ETC. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL TRANSIT OPERATORS MANAGER: STEVE KISH
CONG DIST. 7 & 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 7C9000
STATUS:
TRANSIT VEHICLES TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH
CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 7C9001
STATUS:
TRANSIT VEHICLES TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH
ATLANTA TIP # CONG DIST. 5 & 4
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 7C9002
STATUS:
TRANSIT VEHICLES TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: GEORGIA DOT
MANAGER: STEVE KISH
CONG DIST. 5 & 4
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 8B9001
STATUS:
OPERATING ASSISTANCE FOR RURAL PUBLIC TRANSPORTATION
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 8B9002
STATUS:
OPERATING ASSISTANCE FOR RURAL PUBLIC TRANSPORTATION
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 147
FISCAL YEAR
COST ESTS
CAPITAL 1998
$ 357
FED SHARE $
286
GA. SHARE $
36
OTH SHARE $
36
CAPITAL 1999
$ 204
FED SHARE $ 163
GA. SHARE $
20
OTH SHARE $
20
CAPITAL 1997
$ 109
FED SHARE $
87
GA. SHARE $
11
OTH SHARE $
11
CAPITAL 1998
$ 111
FED SHARE $
89
GA. SHARE $
11
OTH SHARE $
11
CAPITAL 1999
$
57
FED SHARE $
46
GA. SHARE $
5
OTH SHARE $
6
OPERATING 1997 $ 200 FED SHARE $ 100
GA. SHARE $
OTH SHARE $ 100
OPERATING 1998 $ 200 FED SHARE $ 100
GA. SHARE $
OTH SHARE $ 100
~~--:....,..
:~. 'J
"Q.)'?:"!:_'__:'~
\f'--.:7".::. __ ~_,.,
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997IFY 1999
LUMP SUM AREA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
ALL 8B9003
STATUS:
OPERATING ASSISTANCE FOR RURAL PUBLIC TRANSPORTATION TRANSIT PROJECTS I OPERATIONS FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 8C9000
STATUS:
PURCHASE & LEASING OF INTERCITY BUS COACHES AND SIGNAGE PRG.
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: INTERCITY BUS CARRIERS MANAGER: STEVE KISH
CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 8C9001
STATUS:
CAPITAL FOR RURAL PUBLIC TRANSPORTATION
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 8C9002
STATUS:
CAPITAL FOR RURAL PUBLIC TRANSPORTATION TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 8C9003
STATUS:
CAPITAL FOR RURAL PUBLIC TRANSPORTATION TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: RURAL PUBLIC TRANSIT OPERATORS
MANAGER: STEVE KISH
CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 8C9100
STATUS:
PURCHASE & LEASING OF INTERCITY BUS COACHES TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: INTERCITY BUS CARRIERS
MANAGER: STEVE KISH
CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
ALL 8C9101
STATUS:
PURCHASE & LEASING OF INTERCITY BUS COACHES TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: INTERCITY BUS CARRIERS MANAGER: STEVE KISH
CONG DIST. 99
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 148
FISCAL YEAR
COST ESTS
OPERATING 1999
$
200
FED SHARE $ 100
GA. SHARE $
OTH SHARE $ 100
CAPITAL 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1375 1100
275
CAPITAL 1997
$ 277
FED SHARE $ 222
GA. SHARE $
28
OTH SHARE $
28
CAPITAL 1998
$ 277
FED SHARE $ 222
GA. SHARE $
28
OTH SHARE $
28
CAPITAL 1999
$ 277
FED SHARE $ 222
GA. SHARE $
28
OTH SHARE $
28
CAPITAL 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1360 1088
272
CAPITAL 1999
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1471 1177
294
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 149
PROJECT LISTING BY RDC FY 1997IFY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
8V7001 TRANSIT PROJECTS I CAPITAL
CONG DIST. 99
FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
CAPITAL 1997
$ 220
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
176
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
22
OTH SHARE $
22
ALL 8V7002
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA
MANAGER: STEVE KISH
CONG DIST. 99
CAPITAL 1997
$ 167
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
134
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
17
OTH SHARE $
17
ALL 8V7003
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA
MANAGER: STEVE KISH
CONG DIST. 99
CAPITAL 1997
$ 320
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
256
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
32
OTH SHARE $
32
ALL 8V7004
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA
MANAGER: STEVE KISH
CONG DIST. 99
CAPITAL 1998
$ 336
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
269
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
34
OTH SHARE $
34
ALL 8V7005
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
MANAGER: STEVE KISH
CONG DIST. 99
CAPITAL 1998
$ 234
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
187
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
21
OTH SHARE $
26
ALL 8V7006
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA
MANAGER: STEVE KISH
CONG DIST. 99
CAPITAL 1998
$ 176
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
141
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
18
OTH SHARE $
18
ALL 8V7007
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA.
MANAGER: STEVE KISH
CONG DIST. 99
CAPITAL 1999
$ 353
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
282
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
35
OTH SHARE $
35
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 150
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
8V7008 TRANSIT PROJECTS / CAPITAL
CONG DIST. 99
FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
CAPITAL 1999
$ 243
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
194
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
25
OTH SHARE $
24
ALL 8V7009
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH
CONG DIST. 99
CAPITAL 1999
$ 184
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
147
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
19
OTH SHARE $
18
ALL 04M097
STATUS:
LUMP SUM FOR INTERSTATE MAINTENANCE 04M FOR FY 1997
ATLANTA TIP # AR 131J
MINOR WIDEN & RESURF / MAINTENANCE
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 7000 6300 700
ALL 04M098
STATUS:
LUMP SUM MAINT. FOR INTERSTATE MAINTENANCE 04M FOR FY 98 MINOR WIDEN & RESURF / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: L. SEABROOK LGPA NOT APPLICABLE
ATLANTA TIP # AR 131K CONG DIST. 99
0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 25708 23137
2571
ALL 04M099
STATUS:
LUMP SUM MAINT. FOR INTERSTATE MAINTENANCE 04M FOR FY 99
RESURFACE & MAINTENANCE I MAINTENANCE
LENGTH(Miles/km): .001.00000- EXIST. LANES: 0 /PROPOSED
MANAGER: LGPA NOT APPLICABLE
LANES:
ATLANTA TIP # AR 131L CONG DIST. 99 0 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1999
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 15000 13500
1500
ALL 04MB97
STATUS:
LUMP SUM BRIDGE PAINTING 04M FOR FY 97
BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000 MANAGER: LGPA NOT APPLICABLE
ATLANTA TIP # AR 131P CONG.DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 7000 6300
700
ALL 04MB98
STATUS:
LUMP SUM BRIDGE PAINTING 04M FOR FY 98 BRIDGES I MAINTENANCE LENGTH(Mileslkm): .001.00000
MANAGER: LGPA NOT APPLICABLE
ATLANTA TIP # AR 131Q CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 5000 4500
500
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 151
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM BRIDGE PAINTING 04M FOR FY 99
ATLANTA TIP # AR 131R
PE NONE
$
0
04MB99 BRIDGES / MAINTENANCE
CONG DIST. 99
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000
CONST 1999 $ 5000
MANAGER:
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 4500
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 500
OTH SHARE $
ALL 122860
STATUS:
DISTRICT ONE--UPGRADE GUARDRAIL ON NH SYSTEM AT VARIOUS LOCA GUARDRAIL / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: L. SEABROOK
CONG DIST. 9 & 10 0
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
943
FED SHARE $ 754
GA. SHARE $ 189
OTH SHARE $
ALL 210800
STATUS:
DISTRICT TWO--UPGRADE GUARDRAIL ON "I" SYSTEM @ VARIOUS LOCA
GUARDRAIL / MAINTENANCE
CONG DIST. 3 & 11
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$
179
FED SHARE $ 161
GA. SHARE $
18
OTH SHARE $
ALL 222670
STATUS:
DISTRICT TWO--UPGRADE GUARDRAIL ON NH SYSTEM AT VARIOUS LOCA
GUARDRAIL / MAINTENANCE
CONG DIST. 3 & 11
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$ 2400
FED SHARE $ 1920
GA. SHARE $
480
OTH SHARE $
ALL 311970
STATUS:
DISTRICT 3--UPGRADE GUARDRAIL ON "I" SYSTEM @ VARIOUS LOCAT
GUARDRAIL / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: L. SEABROOK
CONG DIST. 2 & 3 0
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997
$ 2241
FED SHARE $ 2017
GA. SHARE $ 224
OTH SHARE $
ALL 315097
STATUS:
LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 97 MINOR WIDEN & RESURF / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: L. SEABROOK LGPA NOT APPLICABLE
ATLANTA TIP # AR 130B CONG DIST. 99 0 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 12118
9694 2424
ALL 315098
STATUS:
LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 98 MINOR WIDEN & RESURF / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: L. SEABROOK LGPA NOT APPLICABLE
ATLANTA TIP # AR 130C CONG DIST. 99
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE $
ROW NONE
$
CONST 19.98
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 30000
24000 6000
COUNTY P. I. NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
LUMP SUM AREA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
ALL 315099
STATUS:
LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 99 RESURFACE & MAINTENANCE / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: LGPA NOT APPLICABLE
ATLANTA TIP # AR 130D CONG DIST. 99 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ALL 315U97
STATUS:
LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1997
LIGHTING / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER:
LANES:
CONG DIST. 99 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ALL 315U98
STATUS:
LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1998
LIGHTING / MAINTENANCE LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED LANES: MANAGER:
CONG DIST. 99 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ALL 315U99
STATUS:
LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY
LIGHTING / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: MANAGER: UNKNOWN
1999 0 /PROPOSED
LANES:
CONG DIST. 99 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ALL 322830
STATUS:
DISTRICT THREE--UPGRADE GUARDRAIL ON NH SYSTEM @ VARIOUS GUARDRAIL / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: L. SEABROOK
LOC LANES:
CONG DIST. 2 & 3 0
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
ALL 33A097
STATUS:
LUMP SUM SAFETY OPTIONAL FOR FY97
ATLANTA TIP # AR 157B
UNKNOWN / SAFETY
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: HWY. SAFETY
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
ALL 33A098
STATUS:
LUMP SUM SAFETY OPTIONAL FOR FY 98
ATLANTA TIP # AR 157C
UNKNOWN / SAFETY
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: HWY. SAFETY
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 152
FISCAL YEAR
COST ESTS
PE NONE $ ROW NONE $ CONST 1999 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 35500 28400 7100
PE NONE
$
0
ROW NONE
$
0
CONST 1997
$
771
FED SHARE $
617
GA. SHARE $
154
OTH SHARE $
PE NONE $
ROW NONE $
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 1000 800 200
PE NONE
$
ROW NONE
$
CONST 1999 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 1000 800
200
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$ 1790
FED SHARE $ 1432
GA. SHARE $ 358
OTH SHARE $
PE NONE $
ROW NONE $
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 1000 900 100
PE NONE
$
ROW NONE
$
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 1000
900 100
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 153
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM SAFETY OPTIONAL FOR FY 99
ATLANTA TIP # AR 157D
PE NONE
$
0
33A099 UNKNOWN / SAFETY
CONG DIST. 99
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1999
$ 1000
MANAGER:
FUND SOURCE: HWY. SAFETY
FED SHARE $
900
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 100
OTH SHARE $
ALL 33C097
STATUS:
LUMP SUM MAINTENANCE FOR AREAS POP GT 200,000 FOR FY 97 MINOR WIDEN & RESURF / MAINTENANCE LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED MANAGER: LGPA NOT APPLICABLE
LANES:
ATLANTA TIP # AR 130J CONG DIST. 99 0 FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 7500 6000
1500
ALL 33C098
STATUS:
LUMP SUM MAINTENANCE FOR AREAS POP GT MINOR WIDEN & RESURF / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. MANAGER: LGPA NOT APPLICABLE
200,000 FOR FY 98 LANES: 0 /PROPOSED
LANES:
ATLANTA TIP # AR 130K CONG DIST. 99 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 7500 6000 1500
ALL 33C099
STATUS:
LUMP SUM MAINTENANCE FOR AREAS POP GT 200,000 FOR FY 99
ATLANTA TIP # AR 130L
RESURFACE & MAINTENANCE / MAINTENANCE
CONG DIST. 99
LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE $
CONST 1999 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 7500 6000 1500
ALL 33CB97
STATUS:
LUMP SUM BRIDGE PAINTING 33C FOR FY 97
BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000 MANAGER: LGPA NOT APPLICABLE
ATLANTA TIP # AR 131F CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 3750 3000
750
ALL 33CB98
STATUS:
LUMP SUM BRIDGE PAINTING FOR FY 98
BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000 MANAGER: LGPA NOT APPLICABLE
ATLANTA TIP # AR 131G CONG DIST. 99
FUND .SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $'
CONST 1998 $ FED SHARE $ GA. SHARE $ OTH SHARE $
0 0 3750 3000 750
ALL 33D097
STATUS:
LUMP SUM MAINTENANCE FOR ANY AREA FOR FY 97
ATLANTA TIP # AR 130F
MINOR WIDEN & RESURF / MAINTENANCE
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE $
ROW NONE $
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 9500
7600 1900
\L
l;'
t
_:)
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 154
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM MAINTENANCE FOR ANY AREA FOR FY 98
33D098 MINOR WIDEN & RESURF / MAINTENANCE
ATLANTA TIP # AR 130G CONG DIST. 99
PE NONE $
0
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1998 $ 9500
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 7600
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1900
OTH SHARE $
ALL 33D099
STATUS:
LUMP SUM MAINTENANCE FOR AN AREA FY 99
ATLANTA TIP # AR 130H
RESURFACE & MAINTENANCE / MAINTENANCE
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1999 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 9500 7600 1900
ALL 33DB97
STATUS:
LUMP SUM BRIDGE PAINTING FOR 33D FOR FY 97 BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000 MANAGER: LGPA NOT APPLICABLE
ATLANTA TIP # AR 131B CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 7000
5600 1400
ALL 33DB98
STATUS:
LUMP SUM BRIDGE PAINTING FOR 33D FOR FY 98 BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000 MANAGER: LGPA NOT APPLICABLE
ATLANTA TIP # AR 131C CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 5000 4000 1000
ALL 33DB99
STATUS:
LUMP SUM BRIDGE PAINTING FOR FY 99 BRIDGES / MAINTENANCE LENGTH(Miles/km): .00/.00000
MANAGER: LGPA NOT APPLICABLE
ATLANTA TIP # AR 131D CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1999
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 5000 4000 1000
ALL 33MS97
STATUS:
LUMP SUM RRX PROTECTION DEVICES 33M FOR FY 97
ATLANTA TIP # AR 153B
RR XING / SAFETY
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: HWY. SAFETY
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 2600 2340 260
ALL 33MS98
STATUS:
LUMP SUM RRX PROTECTION DEVICE FY 98
ATLANTA TIP # AR 153C
RR XING / SAFETY
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: HWY. SAFETY
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE $
ROW NONE
$
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 2600 2340 260
COUNTY P. I. NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
LUMP SUM AREA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
ALL 33MS99
STATUS:
LUMP SUM RRX PROTECTION DEVICES 33MS FOR FY 99
ATLANTA TIP # AR 153D
RR XING / SAFETY
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: HWY. SAFETY
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
ALL 33NS97
STATUS:
LUMP SUM RRX HAZARD ELIMINATION 33N FOR FY 97
ATLANTA TIP # AR 156B
RR XING / SAFETY
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: HWY. SAFETY
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
ALL 33NS98
STATUS:
LUMP SUM RRX HAZARD ELIMINATIO FY 98
ATLANTA TIP # AR 156C
RR XING / SAFETY
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: HWY. SAFETY
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
ALL 33NS99
STATUS:
LUMP SUM RRX HAZARD ELIMINATION FOR FY 99
ATLANTA TIP # AR 156D
RR XING / SAFETY
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: HWY. SAFETY
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
ALL 3AA097
STATUS:
LUMP SUM MAINT. FOR AREA POP BET 5,000-200,000 FOR FY 97
MINOR WIDEN & RESURF / MAINTENANCE
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
ALL 3AA098
STATUS:
LUMP SUM MAINT. FOR AREA BT 5K & 200K. 1998
RESURFACE & MAINTENANCE / MAINTENANCE
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
ALL 3AA099
STATUS:
LUMP SUM MAINT. FOR AREA BT 5K & 200K. FY99
RESURFACE & MAINTENANCE / MAINTENANCE
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 155
FISCAL YEAR
COST ESTS
PE NONE $
ROW NONE $
CONST 1999
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 2600 2340
260
PE NONE $
ROW NONE $
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 2600 2340 260
PE NONE
$
ROW NONE $
CONST 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0
0 2600 2340
260
PE NONE $
ROW NONE $
CONST 1999
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 2600 2340
260
PE NONE $ ROW NONE $ CONST 1997 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 9000 7200 1800
PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $ GA. SHARE $
OTH SHARE $
0
0 7000
5600 1400
PE NONE $
ROW NONE $
CONST 1999
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 7000 5600 1400
~'"-
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 156
PROJECT LISTING BY RDC FY 1997IFY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM BRIDGE PAINTING 3AA FOR FY 97
PE NONE $
0
3AAB97 BRIDGES I MAINTENANCE
CONG DIST. 99
ROW NONE $
0
LENGTH(Mileslkm): .001.00000
CONST 1997 $ 2500
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 2000
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 500
OTH SHARE $
ALL 3AAB98
STATUS:
LUMP SUM BRIDGE PAINTING FOR 3AA FOR FY 98 BRIDGES I MAINTENANCE LENGTH(Mileslkm): .001.00000
MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1998 $
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 1500 1200
300
ALL 410670
STATUS:
DISTRICT FOUR--UPGRADE GUARDRAIL ON "I" SYSTEM @ VARIOUS LOC
GUARDRAIL I MAINTENANCE
CONG DIST. 2 & 8
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE 19.96 UNDERWAY
ROW NONE $
0
CONST 1997 $ 418
FED SHARE $
376
GA. SHARE $
42
OTH SHARE $
ALL 422580
STATUS:
DISTRICT 4--UPGRADE GUARDRAIL ON NH SYSTEM @ VARIOUS LOCAT
GUARDRAIL / MAINTENANCE
CONG DIST. 2 & 8
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997 $ 1725
FED SHARE $ 1380
GA. SHARE $ 345
OTH SHARE $
ALL 511330
STATUS:
DISTRICT 5--UPGRADE GUARDRAIL ON "I" SYSTEM @ VARIOUS LOCAT
GUARDRAIL / MAINTENANCE
CONG DIST. 1 & 8
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997 $ 2560
FED SHARE $ 2304
GA. SHARE $ 256
OTH SHARE $
ALL 611160
STATUS:
DISTRICT SIX--UPGRADE GUARDRAIL ON "I" SYSTEM @ VARIOUS LOCA
GUARDRAIL I MAINTENANCE
CONG DIST. 6 & 9
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997 $ 488
FED SHARE $ 439
GA. SHARE $
49
OTH SHARE $
ALL 621980
STATUS:
DISTRICT SIX--UPGRADE GUARDRAIL ON NH SYSTEM AT VARIOUS LOCA
GUARDRAIL / MAINTENANCE
CONG DIST. 6 & 7
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1997 $ 1500
FED SHARE $ 1200
GA. SHARE $ 300
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 157
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
A-PL-L-.I-.-N-O--. -D--IS-T-R--IC-T---?----U-P-G-PRR-A-OD-JEE-C-T-G-U-DA-AR-TDA-R-A-I-L--ON---"-RI"-E-G-SIOY-NS-TA-EL-M--D-E@V-V-EL-AO-RP-IMO-U-ENS-T--LO-CC-OA-MT-M--IS-S-IO-N--------CO-M--M-E-N-T-S--------------------------P-EY-E-A1-R9-9-6-----U-NE-DS-ETR-SW--AY
713650 GUARDRAIL / MAINTENANCE
CONG DIST. 4 & 5
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1997
$ 1056
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE $
950
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 106
OTH SHARE $
ALL 770391
STATUS:
ATMS-LUMP SUM: REMAINDER OF THE METRO ATLANTA SYSTEM
ATLANTA TIP # AR 098B2
SIGNALS / SAFETY
CONG DIST. 5 & 4
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: DEMONSTRATION PROGRAM
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 19"97
$ 1590
FED SHARE $ 1272
GA. SHARE $ 318
OTH SHARE $
ALL 811020
STATUS:
RURAL IVHS I-85, I-16, I-95, I-75 AND I-20
MISCELLANEOUS IMPROVEMENTS / SAFETY
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: I-STATE MAINT.
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW NONE
$
0
CONST 1997
$ 2310
FED SHARE $ 2310
GA. SHARE $
OTH SHARE $
ALL 811060
STATUS:
REPLACEMENT OF SCALES AT 2 WEIGH STATIONS IN WEIGH STATION / RECST. OR REHAB.
LENGTH(Miles/km): .00/.00000 -EXIST. LANES: MANAGER: JERRY GOSSETT
NOT APPLICABLE
1997 0 /PROPOSED
LANES:
CONG DIST. 99 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$ 3000
FED SHARE $ 2700
GA. SHARE $
300
OTH SHARE $
ALL 811061
STATUS:
REPLACEMENT OF SCALES AT 2 WEIGH STATIONS IN WEIGH STATION / RECST. OR REHAB. LENGTH(Miles/km): ,00/.00000- EXIST. LANES: MANAGER: NOT APPLICABLE
1998 0 /PROPOSED
LANES:
CONG DIST. 99 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST 1998
$ 3000
FED SHARE $ 2700
GA. SHARE $
300
OTH SHARE $
ALL 811062
STATUS:
REPLACEMENT OF SCALES AT 2 WEIGH STATIONS IN 1999 WEIGH STATION / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: NOT APPLICABLE
CONG DIST. 99 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1999
$ 3000
FED SHARE $ 2700
GA. SHARE $ 300
OTH SHARE $
ALL 821050
STATUS:
OFF SYSTEM PILE ENCASEMENT PROJECT TO REPAIR 103 BRIDGES BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000 MANAGER: UNKNOWN NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
0 0 1200 960 240
'{;.
L__ - :'
LI_ - .
~- - . ..!
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
20-Sep-1996 Page 158
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
LUMP SUM AREA
FISCAL
COST
-P--.I-.-N--O-. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM TRANSPORTATION PLANNING & MANAGEMENT SYSTEMS
PE 1997
$ 2000
870021 SPECIAL STUDIES / PLANNING
CONG DIST. 99
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE $
0
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
870150 IS AN ASSOCIATED PROJECT.
ALL 870022
STATUS:
LUMP SUM TRANSPORTATION PLANNING & MANAGEMENT SYSTEMS SPECIAL STUDIES / PLANNING LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED MANAGER: LGPA NOT APPLICABLE
LANES:
CONG DIST. 99 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 870155 IS AN ASSOCIATED PROJECT.
PE 1998 ROW NONE CONST NONE
$ 2000
$
0
$
0
ALL 870023
STATUS:
LUMP SUM TRANSPORTATION PLANNING & MANAGEMENT SYSTEMS
SPECIAL STUDIES / PLANNING
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW NONE
CONST NONE
$ 2000
$
0
$
0
ALL 870150
STATUS:
STATEWIDE BRIDGE INVENTORY AND INSPECTION
PRELIMINARY ENGINEERING / MAINTENANCE
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW NONE CONST NONE
$ 1600
$
0
$
0
ALL 870155
STATUS:
STATEWIDE BRIDGE INVENTORY AND INSPECTION
PRELIMINARY ENGINEERING / MAINTENANCE
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW NONE CONST NONE
$ 1600
$
0
$
0
ALL 870160
STATUS:
TRAINING FOR TEA PROJECTS - 1997 PRELIMINARY ENGINEERING / OTHER LENGTH(Miles/km): .00/.00000- EXIST. MANAGER: UNKNOWN NOT APPLICABLE
LANES:
0 /PROPOSED LANES:
CONG DIST. 99 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
$
25
ROW NONE
$
0
CONST NONE
$
0
ALL 870165
STATUS:
TRAINING FOR TEA PROJECTS - 1998
PRELIMINARY ENGINEERING / OTHER
CONG DIST. 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: TRANS. ENHANCE.
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1998
$
25
ROW NONE
$
0
CONST NONE
$
0
MCINTOSH TRAIL REGIONAL DEVELOPMENT CENTER
Butts Lamar
Pike Spalding
Upson
I~
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
20-Sep-1996 Page 160
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
MCINTOSH TRAIL
FISCAL
COST
-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BUTTS 332510
SR 16 OVER OCMULGEE RIVER AT JASPER CL(M.L.17.45) REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: KEVIN HOSEY
CONG DIST. 11 FUND SOURCE: BRIDGE PROGRAM
PE 1998 ROW CONST
$
16
AFTER 99
AFTER 99
STATUS: BUTTS SGN DO UTIL 4-15-96;JASPER SGN DO UTIL 4-1-96.
FEDERAL HIGHWAY ADMIN FUNDS
BUTTS
INDIAN SPRINGS HISTORIC HOTEL - PHASE I; ALSO 37Y454
PE LOCL
371454 HISTORIC PRESERVATION / ENHANCEMENT
CONG DIST. 11
ROW LOCL
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1997
$
200
MANAGER: NEAL WILKES
FUND SOURCE: TRANS. ENHANCE.
FED SHARE $
160
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
37Y454 IS AN ASSOCIATED PROJECT.
OTH SHARE $
40
BUTTS
INDIAN SPRINGS HISTORIC HOTEL - PHASE II;
SEE 371454
PE LOCL
37Y454 HISTORIC PRESERVATION / ENHANCEMENT
CONG DIST. 11
ROW LOCL
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1998
$
100
MANAGER: UNKNOWN
FUND SOURCE: TRANS. ENHANCE.
FED SHARE $
80
STATUS: TQ BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
371454 IS AN ASSOCIATED PROJECT.
OTH SHARE $
20
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P. I . NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
MCINTOSH TRAIL
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
LAMAR 31138X
STATUS:
I-75 @ SR 36 FM .5 MI SW/I-75 T0.55 MI NE/I-75 & BR'GE/BUTTS
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
311380 IS AN ASSOCIATED PROJECT.
LAMAR 322530
STATUS:
BARNESVILLE BYP [TRUCK BYP] FM SR 7/US 341 N. TO SR 18/US41 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 1.90/3.05710 MANAGER: J. HOBBS REQ CO DO UTIL 2-13-96, REQ BARNESVILLE DO UTIL 2-13-96.
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 161
FISCAL YEAR
COST ESTS
PE NONE $
0
ROW NONE
$
0
CONST NONE $
0
PE 1999 ROW CONST
$
50
AFTER 99
AFTER 99
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 162
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
MCINTOSH TRAIL
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
PIKE 322100
STATUS:
REALIGN SR 362/WILLIAMSON @ PINE;HARVARD;2ND DIST;WILLIAMSON INTERSECTION IMPROVEMENT / SAFETY
LENGTH(Miles/krn): .50/.80450- EXIST. LANES: 2 /PROPOSED LANES: MANAGER: GORDON BROWN PIKE & WILLIAMSON SGN DO UTILITIES 5-21-90 & 6-7-90.
CONG DIST. 3 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
$
5
ROW 1995 UNDERWAY
CONST 1998
$
371
FED SHARE $ 334
GA. SHARE $
37
OTH SHARE $
PIKE 363720
STATUS:
CR 160/ROBERTS QUARTERS ROAD OVER ELKINS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/krn): .50/.80450 MANAGER: GORDON BROWN PIKE COUNTY SIGNED FOR ROW, UTILITIES & DETOURS 1-6-94
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW LOCL
CONST 1998
$
641
FED SHARE $
513
GA. SHARE $
128
OTH SHARE $
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 163
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
MCINTOSH TRAIL
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
SPALDING SR 155 NB MP 11.8/SPALDING-0.25/HENRY;SB MP 1.6-3.1/HENRY 331520 ADDITION OF A PASSING LANE.
LENGTH(Miles/krn): 2.90/4.66610 MANAGER: GORDON BROWN
STATUS: HENRY SGN 5-15-89 FOR UTILITIES; SPALDING REFUSED 2-22-93
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 33152X IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1996 UNDERWAY
CONST 1998
$
988
FED SHARE $ 790
GA. SHARE $
198
OTH SHARE $
SPALDING SR 155 @ TEAMON ROAD/CR 514
331970 TURN LANES / RECST. OR REHAB.
CONG DIST. 3
LENGTH(Miles/krn): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
STATUS: SPALDING SGN DO ROW & UTILITIES 7-23-96.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 UNDERWAY
ROW LOCL
CONST 1999 $ 180
FED SHARE $ 162
GA. SHARE $
18
OTH SHARE $
SPALDING SR 92 OVER MANLEY CREEK @ MP 5.1 NEAR EDWARDS RD 332050 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/krn): .50/.80450 MANAGER: GORDON BROWN STATUS: CO SGN LGPA FOR UTIL 1-16-96.
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1999 CONST
UNDERWAY
$
68
AFTER 99
SPALDING SR 16 @ SR 92 IN GRIFFIN INCL RELOC OF SOLOMON ST 342480 INTERSECTION IMPROVEMENT / SAFETY
LENGTH(Miles/krn): .52/.83668- EXIST. LANES: 5 /PROPOSED LANES:
MANAGER: J. GRAYBEAL STATUS: LETTER/GRIFFIN 9-5-94 UTIL; DOT-ROW 11/92 SEE LTR UTL 7/94
CONG DIST. 3 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
SPALDING SR 3/US 19/GRIFFIN FM SR 92 N/CS 804 N TO N/CR 18 342621 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/krn): 1.52/2.44568 MANAGER: J. GRAYBEAL STATUS: SPALDING SGN DO UTILITIES 9-25-90. OTO PROJECT
CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
SPALDING RESTORE HISTORIC STRUCTURE & CREATE VISITORS CENTER/ GRIFFIN 371230 HISTORIC FACILITIES / ENHANCEMENT
LENGTH(Miles/krn): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: BOB MOORE STATUS: GRIFFIN SIGNED CONTRACT 5-5-95 FOR PE, ROW & UTILITIES
CONG DIST. 3 & 0 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1992 UNDERWAY
ROW 1995 UNDERWAY
CONST 1997
$ 1188
FED SHARE $ 1069
GA. SHARE $
119
OTH SHARE $
PE 1993 UNDERWAY
ROW 1997
$
200
CONST 1998 $ 893
FED SHARE $ 893
GA. SHARE $
OTH SHARE $
PE 1995 UNDERWAY
ROW 1995 UNDERWAY
CONST 1997
$
999
FED SHARE $ 750
GA. SHARE $
OTH SHARE $ 249
ltl
t".
C'
_)
:J
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 164
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
MCINTOSH TRAIL
FISCAL
COST
-P--. -I.-N--O-. ----------------PR--O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
UPSON SR 3/US 19 AT JEFF DAVIS/HARP ROAD IN THOMASTON
PE 1996 UNDERWAY
342790 INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 3
ROW LOCL
LENGTH(Miles/km): .21/.33789 -EXIST. LANES: 4 /PROPOSED LANES: 6
CONST 1997 $ 152
MANAGER: GORDON BROWN
FUND SOURCE: NAT'L HIGHWAY
FED SHARE $ 152
STATUS: UPSON SGN DO ROW & UTIL 4-19-96;THOMASTON NO INVOLVED UTIL.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
OTH SHARE $
UPSON 371205
STATUS:
CR 164/NEW HARMONY RD @ WOLF CK S OF THOMASTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .19/.30571 MANAGER: GORDON BROWN UPSON SGN DO ROW, UTILITIES & DETOURS 11-4-93
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1994 UNDERWAY
ROW LOCL
CONST 1998 $ 375
FED SHARE $ 300
GA. SHARE $
75
OTH SHARE $
MIDDLE FLINT REGIONAL DEVELOPMENT CENTER
Crisp Dooly Macon Marion Schley Sumter Taylor Webster
10
_0________________~10
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
MIDDLE FLINT
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CRISP 41025X
STATUS:
I-75 FM SR 159 NEAR ASHBURN TO 1-MI S OF CR 117/TURNER &"Y" UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: B. FERGUSON
CONG DIST. 0 & 0 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410250 IS AN ASSOCIATED PROJECT.
CRISP 410260
STATUS:
I-75 FM 1 MILE S OF CR 117 TO DOOLY CO LINE; & 41Y260 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 11.88/19.11492 MANAGER: B. FERGUSON
CORDELE SGN UTILITIES 5-1-92;CRISP NO INVOLVED UTILITIES.
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 41Y260 IS AN ASSOCIATED PROJECT.
CRISP 41Y260
STATUS:
I-75 FM 1 MILE S OF CR 117 TO DOOLY CO LINE-FOR IM; 410260 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): .00/.00000 MANAGER: B. FERGUSON
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 410260 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 165
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE 1986 UNDERWAY
ROW 1998 $
50
CONST 1999 $ 6879
FED SHARE $ 5503
GA. SHARE $ 1376
OTH SHARE $
PE 1986 UNDERWAY
ROW NONE
$
0
CONST 1999
$ 4000
FED SHARE $ 3600
GA. SHARE $
400
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 166
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
MIDDLE FLINT
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOOLY
I-75 WIDEN BRIDGE & RAMPS @ SR 27; SEE 31Y665 FOR IM FUNDS
PE 1999 $
80
311665 BRIDGES / RECST. OR REHAB.
CONG DIST. 2
ROW
AFTER 99
LENGTH(Miles/km): .00/.00000
CONST
AFTER 99
MANAGER: B. FERGUSON
FUND SOURCE: NAT'L HIGHWAY
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
31Y665 IS AN ASSOCIATED PROJECT.
DOOLY 321610
STATUS:
SR 90 @ SANDY MOUNT CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .28/.45052 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88 FOR UTILITIES.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 321616 IS AN ASSOCIATED PROJECT.
PE 1990 UNDERWAY
ROW 1995 UNDERWAY
CONST 1997
$
569
FED SHARE $ 455
GA. SHARE $
114
OTH SHARE $
DOOLY 321614
STATUS:
SR 90 @ LITTLE PENNAHATACHEE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .28/.45052 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88 FOR UTILITIES.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1997
$
16
CONST 1997
$
688
FED SHARE $
550
GA. SHARE $ 138
OTH SHARE $
DOOLY 321616
STATUS:
SR 90 @ TURKEY CREEK TRIBUTARY REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .14/.22526 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88 FOR UTILITIES.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM F-EDERAL HIGHWAY ADMIN FUNDS 321610 IS AN ASSOCIATED PROJECT.
PE NONE $
0
ROW 1996 UNDERWAY
CONST 1997
$
234
FED SHARE $
187
GA. SHARE $
47
OTH SHARE $
DOOLY 371210
STATUS:
CR 25 OVER HOGCRAWL CREEK 9 MI WEST OF UNADILLA--MACON REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: GORDON BROWN DOOLY SIGNED FOR ROW, UTILITIES & DETOURS 10-21-93
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 37121X IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1994 UNDERWAY
ROW LOCL
CONST 1998 $ 480
FED SHARE $ 384
GA. SHARE $
96
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 167
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
MIDDLE FLINT
FISCAL
COST
-P--. -I -.N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
MACON
SR 90 @ SCL RR/SAND CRK IN IDEAL; @ SCL RR S/JCT. SR 195
PE 1992
UNDERWAY
322280 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 2
ROW 1995
UNDERWAY
LENGTH(Miles/km): 1.50/2.41350
CONST 1997
$ 2422
MANAGER: GORDON BROWN
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 1938
STATUS: CO SGN FOR UTIL 9/92; CITY SGN 5/91 FOR UTIL
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
484
OTH SHARE $
MACON 332300
STATUS:
SR 49/0GLETHORPE ROAD @ FLINT RIVER OVERFLOW WEST MONTEZUMA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .24/.38616 MANAGER: GORDON BROWN MACON COUNTY SIGNED 3-16-95 SAYING NO UTILITY COST INVOLVED
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW 1998
$
6
CONST 1999
$ 1072
FED SHARE $
858
GA. SHARE $ 214
OTH SHARE $
MACON CR 25 OVER HOGCRAWL CREEK 9 MI W OF UNADILLA; SEE DOOLY
PE NONE
$
0
37121X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: UNKNOWN
FUND SOURCE: BRIDGE PROGRAM
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
371210 IS AN ASSOCIATED PROJECT.
MACON 371480
STATUS:
RENOVATE MONTEZUMA DEPOT
BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 2
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1998
$
612
FED SHARE $
490
GA. SHARE $
OTH SHARE $
122
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
MIDDLE FLINT
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
MARION 331610
STATUS:
SR 355 @ PINE KNOT CREEK N OF JCT W/ SR137 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .50/.80450 MANAGER: GORDON BROWN MARION COUNTY SGN FOR UTILITIES 2-3-92.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MARION 332280
STATUS:
SR 41/BROAD STREET @ CEN. OF GA. RAILROAD IN BUENA VISTA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .25/.40225
MANAGER: GORDON BROWN REQ CITY DO UTIL 11-14-94; COUNTY REFUSED TO FUND 12-13-94
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MARION 342895
STATUS:
CR 128/DOYLE ROAD@ OOCHEE CREEK 2.3 MIN OF SR 26 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789
MANAGER: GORDON BROWN MARION COUNTY SIGNED ROW, UTILITIES & DETOURS 10-12-93
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MARION 343010
STATUS:
SR 355 OVER JUNIPER CREEK AT TALBOT COUNTY LINE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/.80450 MANAGER: GORDON BROWN TALBOT SGN DO UTIL 12-19-94; MARION REFUSED TO FUND 12-13-94
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 168
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1997
$
28
CONST 1998
$
804
FED SHARE $
643
GA. SHARE $ 161
OTH SHARE $
PE 1997 ROW 1999
CONST
$
12
$ 333
AFTER 99
PE 1994 UNDERWAY
ROW LOCL
CONST 1999 $ 361
FED SHARE $ 289
GA. SHARE $
72
OTH SHARE $
PE 1998 ROW 1999 CONST
$
12
$
57
AFTER 99
"
.. ,
'C "..!..._i:J
-- ~J
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
MIDDLE FLINT
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
SUMTER 322430
STATUS:
SR 27/US 280 EB FM MP 6.7-8.2;WB MP 9.49-8.05
ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2,94/4.73046
MANAGER: GORDON BROWN SUMTER SIGNED FOR UTILITIES 8-8-91.
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 169
FISCAL YEAR
COST ESTS
PE 1992 ROW 1998 CONST
UNDERWAY
$
25
AFTER 99
SUMTER 322690
STATUS:
SR 27 AT SR 49 IN AMERICUS
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 2
LENGTH(Miles/km): .09/.14481 -EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
AMERICUS SIGNED FOR UTILITIES 3-22-95
OTO
FEDERAL HIGHWAY ADMIN FUNDS
SUMTER 350750
STATUS:
SR 377/AMERICUS @ GEORGIA SOUTHWESTERN RR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .38/.61142 MANAGER: GORDON BROWN CITY OF AMERICUS SGN 9-29-92 UTILITIES
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
SUMTER 42198X
STATUS:
SR 49 @ KINCHAFOONEE CRK/SEE TERRELL CO- 421980
UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
421980 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1998
$
101
FED SHARE $
91
GA. SHARE $
10
OTH _SHARE $
PE 1989 UNDERWAY
ROW 1998
$
125
CONST 1999
$
619
FED SHARE $
495
GA. SHARE $ 124
OTH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
MIDDLE GEORGIA REGIONAL DEVELOPMENT CENTER
Baldwin Bibb
Crawford Houston Jasper
Jones Monroe Peach Putnam Twiggs Wilkinson
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 170
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
MIDDLE GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BALDWIN SR 22 FM CR 171 TO NE OF SR 24 SPLIT (EAST 3/4 MILE NEW LOC)
PE 1995 UNDERWAY
222180 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 11
ROW 1998
$ 2272
LENGTH(Mi1es/km): 3.50/5.63150
CONST 1999
$ 7486
MANAGER: B. FERGUSON
FUND SOURCE: NAT'L HIGHWAY
FED SHARE $ 5989
STATUS: BALDWIN REF FOR UTL 9/96(S) ;CITY HAS NO INV UTILITIES 3/96.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1497
OTH SHARE $
BALDWIN 231450
STATUS:
SR 49 FM JUST W. OF ALLEN MEMORIAL RD TO MILLEDGEVILLE BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.20/3.53980 MANAGER: M. REYNOLDS
CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW CONST
$ 140 AFTER 99 AFTER 99
BALDWIN 242290
STATUS:
CR 470/PANCRAS ROAD @ CAMP CREEK 6 MI SW OF MILLEDGEVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: D. GRIFFITH BALDWIN SGN FOR ROW, UTILITIES & DETOURS 10-4-94
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW LOCL
CONST 1999
$
254
FED SHARE $ 203
GA. SHARE $
51
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
MIDDLE GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
20-Sep-1996 Page 171
FISCAL YEAR
COST ESTS
BIBB 3D3021
STATUS:
PURCHASE 1 BUS AND P/U TRUCK TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MACON-BIBB TRANSIT AUTHORITY MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1997
$ 198
FUND SOURCE: NON FEDERAL TRANSIT
FED SHARE $
99
GA. SHARE $
OTH SHARE $
99
BIBB 3D3022
STATUS:
ADMIN.VAN(1) AND STORAGE TANKS TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MACON-BIBB TRANSIT AUTHORITY MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1998
$ 175
FUND SOURCE: NON FEDERAL TRANSIT
FED SHARE $
GA. SHARE $
88
OTH SHARE $
88
BIBB 3D3100
STATUS:
PURCHASE 1 BUS AND VIDEO CAMERA & EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MACON-BIBB TRANSIT AUTHORITY MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1999
$ 182
FUND SOURCE: NON FEDERAL TRANSIT
FED SHARE $
GA. SHARE $
91
OTH SHARE $
91
BIBB 3V7004
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN BIBB MPO AREA
MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1997
$
40
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
32
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
4
OTH SHARE $
4
BIBB 3V7021
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN BIBB MPO AREA MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1998
$
42
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
34
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
4
OTH SHARE $
4
BIBB 310713
STATUS:
I-75 @ I-16; SOU RR; ARKWRIGHT RD; US 23 & SR 87; & 31Y713 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): 7.30/11.74570 MANAGER: B. FERGUSON LGPA NOT APPLICABLE
MACON TIP # MCN-14 CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 31Y713 IS AN ASSOCIATED PROJECT.
PE NONE $ ROW NONE $ CONST 1999 $
FED SHARE $ GA. SHARE $
OTH SHARE $
0
0 2385 1908
477
BIBB 310980
STATUS:
I-16 @ SR 540 INCL I-16 ML BR @ SAL RR; 1 STREAM & 1 RIVER
MACON TIP # MCN-11
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 8
LENGTH(Miles/km): .97/1.56073 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: A. ALEXANDER
FUND SOURCE: NAT'L HIGHWAY
LGPA SIGNED BY CO 4-16-85 FOR UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1987 UNDERWAY ROW 1989 UNDERWAY CONST 1999 $ 30284
FED SHARE $ 24227 GA. SHARE $ 6057 OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 172
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
MIDDLE GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BIBB
I-16 IN MACON, FM SR 11 EAST TO SR 87 INCLUDE BRIDGES;31YOOO
MACON TIP # MCN-10
PE 1987
UNDERWAY
311000
RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Mi1es/km): 1.27/2.04343 MANAGER: A. ALEXANDER
CONG DIST. 2 FUND SOURCE: NAT'L HIGHWAY
ROW 1998 CONST
$ 6350 AFTER 99
STATUS: REV REQ MACON DO UTILITIES 11-17-95
FEDERAL HIGHWAY ADMIN FUNDS
31YOOO IS AN ASSOCIATED PROJECT.
BIBB 311400
STATUS:
I-75/MACON FM CR 478 EAST TO I-16 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Mi1es/km): .00/.00000 MANAGER: A. ALEXANDER
MACON TIP # MCN-13 CONG DIST. 8 & 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 31Y400 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1998 CONST
UNDERWAY $ 20700 AFTER 99
BIBB 311460
STATUS:
I-75 @ HARTLEY BRIDGE RD/CR 740
MACON TIP # MCN-1
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 8
LENGTH(Mi1es/km): 1.00/1.60900 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: A. ALEXANDER
FUND SOURCE: I-STATE MAINT.
COUNTY SGN CT FOR CONCEPT REPORT & UTIL 2-9-96.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1998
$ 5000
CONST 1999
$ 2500
FED SHARE $ 2250
GA. SHARE $ 250
OTH SHARE $
BIBB 311560
STATUS:
I-75 @ HARDEMAN AVE, FORSYTH ST & GEORGIA AVE
MACON TIP # MCN-4
TURN LANES / SAFETY
CONG DIST. 2
LENGTH(Mi1es/km): .75/1.20675- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: A. ALEXANDER
FUND SOURCE: I-STATE MAINT.
REQ BIBB DO UTILITIES & CITY/MACON PUBLIC UTIL 1-23-95
FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW 1997
$ 1000
CONST 1998
$ 3804
FED SHARE $ 3424
GA. SHARE $
380
OTH SHARE $
BIBB 311910
STATUS:
I-75 NEW INTERCHANGE AT SARDIS CHURCH RD INTERCHANGE / NEW CONSTRUCTION LENGTH(Mi1es/km): .20/.32180- EXIST. LANES: MANAGER: A. ALEXANDER
0 /PROPOSED LANES:
MACON TIP # MCN-15 CONG DIST. 8
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW LOCL CONST
$ 100 AFTER 99
BIBB 31Y000
STATUS:
I-16 IN MACON, FM SR 11 EAST TO SR 87 -FOR IM $; SEE 311000 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Mi1es/km): .00/.00000 MANAGER: A. ALEXANDER
MACON TIP # MCN-2 CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 311000 IS AN ASSOCIATED PROJECT.
BIBB 31Y713
STATUS:
I-75 @ 5 BRIDGES; FOR IM FUNDING; SEE 310713
MACON TIP # MCN-5
UNKNOWN / RECST. OR REHAB.
CONG DIST. 8
LENGTH(Mi1es/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: B. FERGUSON
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
310713 IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1987 ROW 1998 CONST
UNDERWAY
$
0
AFTER 99
PE NONE
$
0
ROW NONE
$
0
CONST 1999
$
300
FED SHARE $ 270
GA. SHARE $
30
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 173
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
MIDDLE GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BIBB
MILLERFIELD RD/CS 83/MACON FM JEFFERSONVILLE TO NEW CLINTON
MACON TIP # MCN-36
PE 1996 UNDERWAY
342080 INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 2
ROW LOCL
LENGTH(Miles/km): .75/1.20675- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CHURCH
FUND SOURCE: HWY. SAFETY
CONST 1999 $ 1300 FED SHARE $ 1170
STATUS: CO SGN CT DO PE, ROW, UTIL 3-20-96.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 130
OTH SHARE $
BIBB 350820
STATUS:
HOUSTON RD FM WALDEN/SARDIS CH RDS TO SR 11 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 3.20/5.14880 MANAGER: J. LEONI BIBB COUNTY SIGNED CONTRACT 8-2-95 FOR PE, ROW, UTIL & MAINT
MACON TIP # MCN-23 CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1998 $ 4837
FED SHARE $ 3870
GA. SHARE $
967
OTH SHARE $
BIBB 350960
STATUS:
SR 74 FM W OF I-475 W/TRN LNES TO E OF LOG CABIN DR/SR 74 SP
MACON TIP # MCN-40
TURN LANES / RECST. OR REHAB.
CONG DIST. 8 & 2
LENGTH(Miles/km): 1.30/2.09170 - EXIST. LANES: 4 /PROPOSED LANES: 5
MANAGER: A. ALEXANDER
FUND SOURCE: SURFACE TRANSPORT.
BIBB SGN DO UTILITIES 2-22-96;MACON HAS NO INVOLVED UTIL.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1997 $ 1038
CONST 1998 $ 3847
FED SHARE $ 3078
GA. SHARE $
769
OTH SHARE $
BIBB 351080
STATUS:
JEFFERSONVILLE RD FM MILLERFIELD RD TO FALL LINE FWY/US 80 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 1.20/1.93080 MANAGER: D. CHURCH COUNTY SGN CT FOR PE, UTIL & ROW 2-9-96.
MACON TIP # MCN-28 CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY ROW LOCL
CONST 1999 $ 4480 FED SHARE $ 3584 GA. SHARE $ 896 OTH SHARE $
BIBB 351160
STATUS:
CR 73/WESLEYAN DR FM RIVOLI DR TO NORTHSIDE DR/CR 79 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. LENGTH(Miles/km): 1.76/2.83184 MANAGER: A. ALEXANDER CO SGN CT FOR PE, ROW, UTIL 1-18-96.
MACON TIP # MCN-33 CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW LOCL CONST
$
10
AFTER 99
BIBB 371030
STATUS:
LANDSCAPING OF CIVIC SQUARE FOR PARK IN MACON
MACON TIP # MCN-43
LANDSCAPING / ENHANCEMENT
CONG DIST. 2 & 8
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: CORA COOK
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
BIBB 371420
STATUS:
UPGRADE DOWNTOWN TRAFFIC SIGNALIZATION
MACON TIP # MCN-41
SIGNALS / SAFETY
CONG DIST. 2
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KARL ALFF
FUND SOURCE: HWY. SAFETY
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW LOCL
CONST 1997
$
300
FED SHARE $
240
GA. SHARE $
OTH SHARE $
60
PE 1997 ROW LOCL CONST
$
10
AFTER 99
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
MIDDLE GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
BIBB 371450
STATUS:
CITY OF MACON STREETSCAPE
MACON TIP # MCN-44
BICYCLE/PED. FACILITY / ENHANCEMENT
CONG DIST. 2
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: CORA COOK
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
BIBB 371452
STATUS:
CITY OF MACON HISTORIC HAY HOUSE & GROUNDS
MACON TIP # MCN-45
H!STORIC PRESERVATION / ENHANCEMENT
CONG DIST. 2
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: CORA COOK
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 174
FISCAL YEAR
COST ESTS
PE LOCL
ROW LOCL
CONST 1997
$
600
FED SHARE $
480
GA. SHARE $
OTH SHARE $ 120
PE LOCL
ROW LOCL
CONST 1997
$
558
FED SHARE $
446
GA. SHARE $
OTH SHARE $ 112
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 175
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
MIDDLE GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
HOUSTON ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
3V7019 TRANSIT PROJECTS / CAPITAL
CONG DIST. 8 & 2
FUNDS RECIPIENT: AGENCIES IN W. ROBINS MPO AREA
CAPITAL 1997
$
30
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
24
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
HOUSTON 3V7022
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN W. ROBINS MPO AREA MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1998
$
31
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
HOUSTON 3V7029
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: AGENCIES IN W. ROBINS MPO AREA MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1999
$
33
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
4
OTH SHARE $
3
HOUSTON SR 96 FM I-75 TO CR 540/0LD HAWKINSVILLE RD/PEACH COUNTY
W. ROBINS TIP # 1993(6)
32245X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
PE NONE $
0
ROW NONE
$
0
CONST NONE $
0
MANAGER: UNKNOWN
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
322450 IS AN ASSOCIATED PROJECT.
HOUSTON 322560
STATUS:
I-75 AT NEW SOUTHWEST PERRY PARKWAY {BYPASS}
INTERCHANGE / NEW CONSTRUCTION
CONG DIST. 2 & 8
LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: 0 /PROPOSED LANES: 4
MANAGER: J. GARLAND
FUND SOURCE: NAT'L HIGHWAY
HOUSTON COUNTY SIGNED 9-1-92 FOR UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1996 UNDERWAY CONST 1998 $ 6236
FED SHARE $ 4989 GA. SHARE $ 1247 OTH SHARE $
HOUSTON 322570
STATUS:
SW PERRY PARKWAY {BYPASS} FM SR 127 SE TO LIMEROCK ROAD/GIP CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
LENGTH(Miles/km): 3.80/6.11420
MANAGER: J. GARLAND HOUSTON SGN ROW & UTIL 9-1-92;PERRY NO INVOLVED UTILITIES.
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1998 $ 5232 FED SHARE $ 4186 GA. SHARE $ 1046 OTH SHARE $
HOUSTON 331860
STATUS:
SR 127 FM EAST OF JOY LAKE RD TO CR 279/BEAR BRANCH RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.65/4.26385 MANAGER: RAY METTS HOUSTON SGN DO UTILITIES 6-20-96.
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1998
CONST
UNDERWAY $ 1832 AFTER 99
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
st.~--~
~~::.'::-'.:"
~.:i:f_:-:-,.J
t,.:!::...A_" ~.-J
~.r;<
COUNTY P. I. NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
MIDDLE GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
HOUSTON 342340
STATUS:
SR 247C FM HOUSTON LAKE RD TO SR 247/INCL INTER. IMPROVEMENT
W. ROBINS TIP # 1985-06
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 8 & 2
LENGTH(Miles/km): 4.80/7.72320 -EXIST. LANES: 5 /PROPOSED LANES: 5
MANAGER: J. LEONI
FUND SOURCE: HWY. SAFETY
SGN ROW & UTILITIES 5/18/88 - OTO PROJECT
FEDERAL HIGHWAY ADMIN FUNDS
HOUSTON 350840
STATUS:
HOUSTON LAKE RD/CR 535 FM SR 96 TO RICHARD RUSSELL PKWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 2.81/4.52129 MANAGER: B. FERGUSON REV REQ CO DO ROW/UTIL/CST FOR C&G & DRAIN. CITY SGN 10/92
W. ROBINS TIP # 1991-2 CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
HOUSTON 351070
STATUS:
CR 156/MOODY ROAD @ BAY GALL CREEK/WARNER ROBINS - SOUTHSIDE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .31/.49879 MANAGER: GORDON BROWN WARNER ROBINS SGN DO ROW, UTIL & DETOURS 7-10-95
W. ROBINS TIP # 1996(1) CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 176.
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW LOCL
CONST 1998 $ 650
FED SHARE $ 585
GA. SHARE $
65
OTH SHARE $
PE 1992 UNDERWAY ROW LOCL
CONST 1999 $ 8588 FED SHARE $ 6870 GA. SHARE $ 902 OTH SHARE $ 816
PE 1997 UNDERWAY ROW LOCL
CONST 1999 $ 564 FED SHARE $ 451 GA. SHARE $ 113 OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 177
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
MIDDLE GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
JASPER SR 16 @ SR 212 EAST OF MONTICELLO
PE 1994 UNDERWAY
231520 INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 11
LENGTH{Miles/km): .37/.59533 -EXIST. LANES: 2 /PROPOSED LANES: 3
ROW 1997
$
7
CONST 1998
$
482
MANAGER: D. GRIFFITH STATUS: REQ JASPER DO UTIL 3-4-94; MONTICELLO SGN 3-14-94 UTIL
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 434
GA. SHARE $
48
OTH SHARE $
JASPER 270815
STATUS:
CR 131/FH 21 @ STALKING HEAD CREEK BRIDGES / REPLACEMENT LENGTH{Miles/km): .20/.32180 MANAGER: D. GRIFFITH CO SGN ROW & UTIL 2-8-96.
CONG DIST. 11
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
$
5
ROW LOCL
CONST 1998 $
90
FED SHARE $
90
GA. SHARE $
OTH SHARE $
JASPER 271110
STATUS:
CR 141/FH 50/RIVER RD @ KINNARD, LONG&CROW CKS & 2 UNNAMED BRIDGES / REPLACEMENT LENGTH{Miles/km): .50/.80450 MANAGER: D. GRIFFITH JASPER SIGNED FOR ROW, UTILITIES & DETOURS 10-2-95
CONG DIST. 11
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY ROW LOCL
CONST 1999 $ 485 FED SHARE $ 485 GA. SHARE $ OTH SHARE $
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
MIDDLE GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
JONES 24230X
STATUS:
SR WESTBOUND FROM MP 24.83/JONES TO 1.28 WILKINSON UNKNOWN / UNKNOWN LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: D. GRIFFITH
CONG DIST. 0 & 0 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 242300 IS AN ASSOCIATED PROJECT.
JONES 331850
STATUS:
SR 18 EB MP 14.85-16.1; WB MP 17.14-18.7; EB MP 21.39-22.59 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 4.01/6.45209 MANAGER: GORDON BROWN REQ EATONTON DO P UTL 9/92;JONES REF 4/96(S);GRAY SGN 2/95.
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 178
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE 1993 UNDERWAY
ROW 1997
$
39
CONST 1998
$ 2312
FED SHARE $ 1850
GA. SHARE $
462
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 179
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
MIDDLE GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA---------R--EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
MONROE I-75 UPGRADE REST AREA #22, PHASE II
PE 1994
UNDERWAY
311617 REST AREA / RECST. OR REHAB.
CONG DIST. 3
ROW 1996 UNDERWAY
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1997 $ 1200
MANAGER: J. GARLAND
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 1080
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 120
OTH SHARE $
MONROE 311740
STATUS:
SR 408/I-475 NBL @ I-75; ADD ONE LANE & REPL BRIDGE DECK BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .25/.40225 MANAGER: K. FULBRIGHT MONROE SGN FOR UTILITIES 2-10-95; NO UTIL INVOLVED 12-12-94
CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW 1997 $
20
CONST 1998
$
430
FED SHARE $ 387
GA. SHARE $
43
OTH SHARE $
MONROE 322360
STATUS:
SR 83 FM S/CR 125/HUBBARD DR NE TO SR 18/US 41 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. LENGTH(Miles/km): 1.00/1.60900 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1999 CONST
UNDERWAY
$ 225 AFTER 99
MONROE 370811
STATUS:
CR 163/WESTBROOKS RD OVER TOWALIGA RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .25/.40225 MANAGER: J. LEONI MONROE SGN DO ROW, UTIL & DETOURS 5-5-92.
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1993 UNDERWAY
ROW LOCL
CONST 1997 $ 410
FED SHARE $ 328
GA. SHARE $
82
OTH SHARE $
""
~::.:_.'
~ ."J
... ~:_ _~.~~-
:!:d ,_~.,---
1.,~::(
~~~~-:. J
<:::'::;....:__' -~-~'
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 180
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
MIDDLE GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PEACH I-75 @ SR 96
W. ROBINS TIP # WR1-1993(1)
PE 1993 UNDERWAY
311540 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 2
ROW 1997
$ 1227
LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: 2 /PROPOSED LANES: 4
CONST 1998
$ 3884
MANAGER: M. REYNOLDS
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 3496
STATUS: PEACH COUNTY REFUSED TO COMMIT FUNDS BY LETTER 11-28-95
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 388
OTH SHARE $
PEACH 311780
STATUS:
I-75: CR 182/WHITE ROAD OVER I-75 BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .50/.80450 MANAGER: B. FERGUSON REQ PEACH DO UTIL 10-7-93; BYRON SGN 10-12-93 PUBLIC UTIL
CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1999 CONST
UNDERWAY
$
1
AFTER 99
PEACH 322450
STATUS:
SR 96 FM I-75 TO CR 540/0LD HAWKINSVILLE RD/HOUSTON COUNTY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES, LENGTH(Miles/km): 10.45/16.81405 MANAGER: M. REYNOLDS
PEACH 331940
STATUS:
SR 42 FM NEAR OLD FT VALLEY RD EAST TO SR 49 SW OF CHURCH ST CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): .40/.64360 MANAGER: GORDON BROWN COUNTY SGN 1-14-92 PUB UTIL; BYRON DO WATER LINES ONLY 8/93
W. ROBINS TIP # 1993(6) CONG DIST. 8 & 2
FUND SOURCE: SURFACE TRANSPORT . . FEDERAL HIGHWAY ADMIN FUNDS
32245X IS AN ASSOCIATED PROJECT,
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1998 ROW
CONST
$ 240 AFTER 99 AFTER 99
PE 1993 UNDERWAY
ROW 1997 $ 300
CONST 1998
$ 1479
FED SHARE $ 1183
GA. SHARE $ 296
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 181
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
MIDDLE GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PUTNAM SR 24/US 441 AT WASHINGTON AVENUE IN EATONTON
PE 1994 UNDERWAY
222450 SIGNALS / SAFETY
CONG DIST. 11
ROW LOCL
LENGTH(Miles/km): .12/.19308- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GRIFFITH
FUND SOURCE: NAT'L HIGHWAY
STATUS: EATONTON SGN UTIL 2-16-93; & ADDL MAST ARM COST
FEDERAL HIGHWAY ADMIN FUNDS
CONST 1998
$
FED SHARE $
GA. SHARE $
1010 1000
OTH SHARE $
10
PUTNAM 231270
STATUS:
SR 16 OVER THE OCONEE RIVER @ HANCOCK COUNTY LINE REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .31/.49879 MANAGER: D. GRIFFITH HANCOCK SGN DO UTILITIES 5-20-96;PUTNAM SGN DO UTIL 5-7-96.
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW CONST
$
400
AFTER 99
AFTER 99
PUTNAM 270760
STATUS:
CR 212/FH 24 SOUTH OF SR 24 @ TOWN CREEK BRIDGES / REPLACEMENT
LENGTH(Miles/km): .20/.32180 MANAGER: D. GRIFFITH CO SGN ROW, UTIL & DETOURS 2-20-96.
CONG DIST. 11
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
PUTNAM 271130
STATUS:
MARTIN MILL RD/CR 29/FH 27 @ LITTLE RIVER BRIDGES / REPLACEMENT LENGTH(Miles/km): .20/.32180 MANAGER: D. GRIFFITH PUTNAM SGN ROW, UTILITIES & DETOURS 3-5-96.
CONG DIST. 11
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1997
$
5
ROW LOCL
CONST 1998 $ 300
FED SHARE $ 300
GA. SHARE $
OTH SHARE $
PE 1997
$
13
ROW LOCL
CONST 1998
$
850
FED SHARE $ 850
GA. SHARE $
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
MIDDLE GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
TWIGGS 24502X
STATUS:
SR 18 @ BIG SANDY CK FM MP 0.2 IN TWIGGS TO MP 11.60 WILKNSN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .02/.03218 MANAGER: UNKNOWN WILKINSON SGN FOR UTILITIES 12-6-94.
CONG DIST. 0 & 0
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 245020 IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 182
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
MIDDLE GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
WILKINSO US 441 @ BIG SANDY CREEK S OF IRWINTON 221762 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .00/.00000
MANAGER: M. REYNOLDS STATUS: WILKINSON REFUSED UTILITIES 6-12-92
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
WILKINSO SR 29/US 441 @ BLACK CREEK 221935 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .00/.00000 MANAGER: M. REYNOLDS
STATUS: WILKINSON REFUSED 6-12-92 LETTER
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
WILKINSO SR 57 OVER THE OCONEE RIVER AT WASHINGTON COUNTY LINE 222220 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 3 LANES.
LENGTH(Miles/km): .35/.56315 MANAGER: D. GRIFFITH STATUS: WASHINGTON HAS NO INV UTILITY; WILKINSON REF DO UTIL 5-21-96
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 183
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1998 $ 1531
FED SHARE $ 1225
GA. SHARE $
306
OTH SHARE $
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1998
$
161
FED SHARE $
129
GA. SHARE $
32
OTH SHARE $
PE 1998 ROW CONST
$
80
AFTER 99
AFTER 99
WILKINSO SR 18 WESTBOUND FROM MP 24.83/JONES TO MP 1.28/WILKINSON
242300 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 1.80/2.89620
MANAGER: GORDON BROWN STATUS: REQ WILKINSON & JONES DO UTILITIES 9/4/96.
CONG DIST. 11 & 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 24230X IS AN ASSOCIATED PROJECT.
WILKINSO SR 18 @ BIG SANDY CK FM MP 0.2 IN TWIGGS TO MP 11.60 WILKNSN 245020 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .64/1.02976 MANAGER: D. GRIFFITH STATUS: WILKINSON SGN FOR UTILITIES 12-6-94.
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 24502X IS AN ASSOCIATED PROJECT.
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1997 $
ROW 1997
$
CONST 1998 $
FED SHARE $
GA. SHARE $
OTH SHARE $
20 168 1054
843
211
PE 1996 UNDERWAY
ROW 1998 $
10
CONST 1999 $ 995
FED SHARE $ 796
GA. SHARE $ 199
OTH SHARE $
NORTH GEORGIA REGIONAL DEVELOPMENT CENTER
Fannin Gilmer Murray Pickens Whitfield
gero,
.
1khouser
I
10 0
10
SCALE IN MILES
NORTH GEORGIA
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 184
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTH GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FANNIN SR 771 FM SR 5 NEAR CR 18 S/MCCAYSVILLE TO TENN. STATE LINE 620490 CONSTRUCTION OF NEW ROUTE WITH 5 LANES PROPOSED.
CONG DIST. 9
PE 1998 ROW
$
167
AFTER 99
LENGTH(Miles/km): 2.05/3.29845
CONST
AFTER 99
MANAGER: J. GRAYBEAL
FUND SOURCE: NAT'L HIGHWAY
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
FANNIN 621910
STATUS:
SR 2 SLIDE AREA@ MP 16.4 EAST OF MORGANTON
WALLS / MAINTENANCE
CONG DIST. 9
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
FANNIN 621950
STATUS:
SR 2/515 AT CR 260/WINDY RIDGE DRIVE
TURN LANES / SAFETY
CONG DIST. 9
LENGTH(Miles/km): .23/.37007 -EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: GREG PARKER
FUND SOURCE: NAT'L HIGHWAY
FANNIN SIGN ROW, UTIL 7-6-95
FEDERAL HIGHWAY ADMIN FUNDS
FANNIN 670930
STATUS:
RESTORE MINERAL BLUFF DEPOT
HISTORIC FACILITIES / ENHANCEMENT
CONG DIST. 9
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: JANET HARVEY
FUND SOURCE: TRANS. ENHANCE.
LGPA TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE NONE
$
0
ROW 1996 UNDERWAY
CONST 1997
$
700
FED SHARE $ 560
GA. SHARE $ 140
OTH SHARE $
PE 1997
$
5
ROW LOCL
CONST 1998
$
172
FED SHARE $
172
GA. SHARE $
OTH SHARE $
PE LOCL
ROW NONE $
0
CONST 1997
$
128
FED SHARE $
101
GA. SHARE $
OTH SHARE $
27
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 185
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTH GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--EN--T--C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GILMER SR 282/ELLIJAY FM WEST OF SR 5 ALT EAST TO SR 2
PE 1992 UNDERWAY
631100 ADDITION OF A PASSING LANE.
CONG DIST. 9
ROW 1995 UNDERWAY
LENGTH{Miles/km): 1.17/1.88253
CONST 1997 $ 2898
MANAGER: J. GRAYBEAL
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 2318
STATUS: ELLIJAY SGN 8-24-92. DOT WILL PAY GILMER UTIL 1-19-94
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
580
OTH SHARE $
GILMER 631110
STATUS:
SR 52 EB FM MP 16.0-17.8; WB MP 18.8-20.17 ADDITION OF A PASSING LANE. LENGTH{Miles/km): 3.17/5.10053 MANAGER: GREG PARKER GILMER SGN DO UTILITIES 7-14-92
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1995 UNDERWAY
CONST 1998
$ 1296
FED SHARE $ 1037
GA. SHARE $ 259
OTH SHARE $
GILMER 631430
STATUS:
SR 2/SR 52@ MOUNTAINTOWN CREEK 6.7 MI NW OF ELLIJAY REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. LENGTH{Miles/km): .23/.37007 MANAGER: GREG PARKER REQ GILMER COUNTY DO UTILITIES 10-6-93
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1998
$
41
CONST 1999 $ 1186
FED SHARE $ 949
GA. SHARE $ 237
OTH SHARE $
GILMER 631580
STATUS:
SR 282 BRIDGE REPLACEMENT OVER TAILS CREEK WEST OF ELLIJAY REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. LENGTH{Miles/km): .56/.90104 MANAGER: GREG PARKER GILMER REF DO UTLITIES 5-1-96.
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW
CONST
$
11
AFTER 99
AFTER 99
GILMER 671074
STATUS:
LANDSCAPING/STREETSCAPING OF LANDSCAPING / ENHANCEMENT LENGTH{Miles/km): .00/.00000
MANAGER: TO BE DONE BY CONTRACT
TOWN SQUARE IN ELLIJAY - EXIST. LANES: 0 /PROPOSED LANES:
CONG DIST. 9 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW LOCL
CONST 1998
$
500
FED SHARE $ 400
GA. SHARE $
OTH SHARE $ 100
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 186
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTH GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
MURRAY SR 52 @ L&N RR
PE 1996 UNDERWAY
620399 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
CONG DIST. 9
ROW 1996 UNDERWAY
LENGTH(Miles/km): .17/.27353
CONST 1998
$
762
MANAGER: GREG PARKER
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
610
STATUS: CHATSWORTH SGN DO UTILITIES 5-6-96.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
152
OTH SHARE $
MURRAY 621265
STATUS:
SR 282/US 76 EB FM MP 4.5-5.7; WB FM MP 5.6-6.75 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 2.25/3.62025
MANAGER: GREG PARKER REV REQ MURRAY DO UTILITIES 8-7-96;CHATSWORTH NO CONFLICT.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1996 UNDERWAY
CONST 1998
$ 1738
FED SHARE $ 1390
GA. SHARE $ 348
OTH SHARE $
MURRAY 670780
STATUS:
CR 299 OVER EMERY/HOLLY CREEK BRIDGES / REPLACEMENT LENGTH(Miles/km): .16/.25744 MANAGER: GREG PARKER COUNTY SGN FOR UTILITIES 7-8-92,
NO ROW REQUIRED
CONG DIST. 9
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW NONE $
0
CONST 1997
$
463
FED SHARE $
463
GA. SHARE $
OTH SHARE $
MURRAY 671055
STATUS:
CR 132/MITCHELL BR RD OVER CONASAUGA RIVER/WHITFIELD COUNTY REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. LENGTH(Miles/km): .87/1.39983 MANAGER: GREG PARKER REQ WHITFIELD DO RUO 5/22/96; MURRAY SGN CT PE,ROW,UTL 7/95
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 67105X IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW LOCL
CONST 1999
$ 2593
FED SHARE $
800
GA. SHARE $
OTH SHARE $ 1793
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 187
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTH GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PICKENS SR 53 EB MP 7.25-8.4; WB MP 8.4-10.05
PE 1992 UNDERWAY
621640 ADDITION OF A PASSING LANE.
CONG DIST. 9
ROW 1998 $ 278
LENGTH(Miles/km): 2.70/4.34430
CONST 1999
$ 1240
MANAGER: GREG PARKER
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $
992
STATUS: PICKENS REFUSED FOR UTILITIES 9-4-96.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 248
OTH SHARE $
PICKENS 621830
STATUS:
SR 53 AT MARY ST & SPRING ST./BURNT MOUNTAIN RD IN JASPER INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .12/.19308- EXIST. LANES: 3 /PROPOSED LANES:
MANAGER: GREG PARKER PICKENS SGN DO ROW, UTILITIES & DETOURS 5-18-95.
CONG DIST. 9 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1997
$
159
FED SHARE $
143
GA. SHARE $
16
OTH SHARE $
PICKENS 632680
STATUS:
SR 5/515 AT SR 53 WEST OF JASPER TURN LANES / SAFETY LENGTH(Miles/km): .45/.72405- EXIST. LANES:
MANAGER: UNKNOWN PICKENS SIGNED FOR ROW AND UTIL 5-16-96.
4 /PROPOSED LANES: OTO
CONG DIST. 9 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1997 UNDERWAY
ROW LOCL
CONST 1998 $ 370
FED SHARE $ 333
GA. SHARE $
37
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
NORTH GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
WHITFIEL I~75 & SR 3 CONN FM CR 91 E TO DUG GAP RD E/I-75 610690 INTERCHANGE / RECST. OR REHAB.
LENGTH(Miles/km): .60/.96540- EXIST. LANES: 2 /PROPOSED
MANAGER: RAY METTS STATUS: WHITFIELD COUNTY SIGNED FOR UTILITIES 7-29-91.
LANES:
CONG DIST. 9 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
WHITFIEL I-75 @ SR 3/US 41/ROCKY FACE EXIT
610760 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 9
LENGTH(Miles/km): .53/.85277- EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: J. GARLAND
FUND SOURCE: I-STATE MAINT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 188
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$ 4284
FED SHARE $ 3427
GA. SHARE $ 857
OTH SHARE $
PE 1995 ROW 1998 CONST
UNDERWAY $ 250 AFTER 99
WHITFIEL I-75 INTERCHANGE AT CARBONDALE ROAD/CR 665 610890 INTERCHANGE / RECST. OR REHAB.
LENGTH(Miles/km): 1.00/1.60900 - EXIST. LANES: MANAGER: RAY METTS STATUS: WHITFIELD SGN FOR UTILITIES 12-21-95
CONG DIST. 9 6 /PROPOSED LANES: 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
WHITFIEL I-75 RAMP AT SR 201 610900 RAMP / RECST. OR REHAB.
LENGTH(Miles/km): .40/.64360- EXIST. LANES: 6 /PROPOSED LANES: MANAGER: RAY METTS STATUS: WHITFIELD REF DO UTIL 4-12-96;REQ DALTON DO UTIL 4-18-96.
CONG DIST. 9 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
WHITFIEL SR 3/US 41 FM S OF STONECREST DR N TO CR 306/TUNNEL HILL 620960 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 2.90/4.66610 MANAGER: J. GARLAND STATUS: REQ DALTON DO UTIL 7/92;CO REF 10/94;TUNNELL NO INV UTIL.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
WHITFIEL SR 71 FM N OF CR 213/677 NORTHERLY TO CR 19/COHUTTA 620975 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 4.10/6.59690 MANAGER: J. GRAYBEAL STATUS: DOT TO PAY WHITFIELD & COHUTTA 6/25/96.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
WHITFIEL SR 201 EB MP 13.b-.i.4.9; v'TB MP 14.6-15.5; WB 17-18;RTL@ SR 2 631250 ADDITION OF A PASSING LANE.
LENGTH(Miles/km): 3.40/5.47060 MANAGER: GREG PARKER STATUS: REQ WHITFIELD DO UTILITIES 7/16/96.
CONG DIST. 9
FU':1D <:0!1?rE: SURFACE TRANSPORT. FEDERAL HIGrtm>~ "---'C~'I~l FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1995 UNDERWAY
ROW 1997 $
10
CONST 1998
$
686
FED SHARE $
617
GA. SHARE $
69
OTH SHARE $
PE 1995 UNDERWAY
ROW 1997
$
10
CONST 1999
$
187
FED SHARE $
168
GA. SHARE $
19
OTH SHARE $
PE 1992
UNDERWAY
ROW 1993 UNDERWAY
CONST 1999 $ 7482
FED SHARE $ 5986
GA. SHARE $ 1496
OTH SHARE $
PE 1992
UNDERWAY
ROW 1993 UNDERWAY
CONST 1997
$ 4059
FED SHARE $ 3247
GA. SHARE $
812
OTH SHARE $
PE 1992
UNDERWAY
ROW 1998
$
284
CONST 1999
$ 3886
FED SHARE $ 3109
GA. SHARE $
777
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
NORTH GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
WHITFIEL CR 132/MITCHELL BR RD OVER CONASAUGA RIVER/MURRAY COUNTY 67105X REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .00/.00000 MANAGER: UNKNOWN STATUS:
('('IU'
F"UND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 671055 IS AN ASSOCIATED PROJECT.
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 189
FISCAL YEAP
COST
PE 1998 $
0
ROW LOCL
CONST 1999
$
0
FED SHARE $
GA. SHARE $
OTH SHARE $
('
NORTHEAST GEORGIA REGIONAL DEVELOPMENT CENTER
Barrow Clarke Elbert Greene Jackson Madison Morgan Newton Oconee Oglethorpe Walton
10 0
10
SCALE IN MILES
NORTHEAST GEORGIA
ROC change effective 7-1-96
<a:
'"'"' --~'?
'(~~~
~;'"~~_:'i':;':1
li.:.i'!!::'':::lt:Jl
'il:i:.:c:,:_;,iJJ
c.~'-'>;
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 190
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--E-N-T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BARROW SR 316 IN BARROW AND OCONEE COUNTIES-26 INTERCHANGES
PE 1997 $ 100
122870 INTERCHANGE / NEW CONSTRUCTION
.CONG DIST. 10
ROW
AFTER 99
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 4 /PROPOSED LANES: 4
CONST
AFTER 99
MANAGER: M. REYNOLDS
FUND SOURCE: NAT'L HIGHWAY
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
BARROW 132220
STATUS:
SR 211 @ CR 326/MP 17.51;CR 61/MP 21.05;CHATEAU ELAN/MP 22.0 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. LENGTH(Miles/km): 1.26/2.02734
MANAGER: L. OWENS BARROW SGN 11/93 UTIL; REFUSED BY WINDER 1/94/BRASELTN 10/95
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
BARROW 132570
STATUS:
SR 53/GAINESVILLE HWY. @ CEDAR CREEK 2.7 MI NORTH OF WINDER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .30/.48270 MANAGER: L. OWENS REQ WINDER DO PUB UTIL 11/94; COUNTY SGN FOR UTIL 11-16-94
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 132670 IS AN ASSOCIATED PROJECT.
BARROW 132670
STATUS:
SR 53 AT ROCKWELL CHURCH RD/CR 4 NORTH OF WINDER
INTERSECTION IMPROVEMENT / SAFETY LENGTH(Miles/km): .20/.32180- EXIST. LANES: 2 /PROPOSED LANES:
MANAGER: L. OWENS BARROW SGN DO UTILITIES 3-19-96.
CONG DIST. 10 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 132570 IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1992 UNDERWAY ROW 1996 UNDERWAY
CONST 1998 $ 1530 FED SHARE $ 1224 GA. SHARE $ 306 OTH SHARE $
PE 1996 UNDERWAY
ROW 1998 $
75
CONST 1999 $ 602
FED SHARE $
482
GA. SHARE $ 120
OTH SHARE $
PE 1997 UNDERWAY
ROW 1998 $
31
CONST 1999
$
669
FED SHARE $
602
GA. SHARE $
67
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997IFY 1999
NORTHEAST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CLARKE 1D1019
STATUS:
PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
20-Sep-1996 Page 191
FISCAL YEAR
COST ESTS
OPERATING 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1995 510
1485
CLARKE 1D1020
STATUS:
TRANSIT VEHICLES, CAPITAL MAINTENANCE TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$ 302
FED SHARE $ 242
GA. SHARE $
30
OTH SHARE $
30
CLARKE 1D1022
STATUS:
TRANSIT VEHICLE TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1997
$ 255
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $ 204
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
26
OTH SHARE $
26
CLARKE 101023
STATUS:
MULTIMODAL TRANSPORTATION CENTER TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1998
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
2600 2080
260 260
CLARKE 101061
STATUS:
TRANSIT VEHICLES, OFFICE EQUIP., FACILITY IMPROVEMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$ 326
FED SHARE $ 261
GA. SHARE $
33
OTH SHARE $
33
CLARKE 1D1062
STATUS:
TRANSIT VEHICLE, VAN, CAPITAL MAINT., ADMIN VEH., SHELTERS
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1998
$ 805
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
644
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
81
OTH SHARE $
81
CLARKE 101063
STATUS:
PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
OPERATING 1998 $ FED SHARE $
GA. SHARE $ OTH SHARE $
2061 391
1670
fe_ -~ I
~'C:-2:'?
~-:-E"r,.,
l'i ...... ~-.~~
1:_~:.:-<::
v 'li'. ..::....~.:....
!:::~-.- ' . )
~.::...:::.....:. ~ ~)
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997IFY 1999
NORTHEAST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CLARKE 101065
STATUS:
PUBLIC TRANSIT SERVICE IN ATHENS AND CLARKE COUNTY TRANSIT PROJECTS I OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CLARKE 1D1066
STATUS:
TRANSIT VEHICLES, VAN, CAP. MAINT., SHELTERS, OFFICE EQUIP. TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
20-Sep-1996 Page 192
FISCAL YEAR
COST ESTS
OPERATING 1999 $ FED SHARE $
GA. SHARE $ OTH SHARE $
2130 392
1738
CAPITAL 1999
$ 479
FED SHARE $ 383
GA. SHARE $
48
OTH SHARE $
48
CLARKE 1D1067
STATUS:
TRANSIT VEHICLE
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
MANAGER: STEVE KISH
CLARKE 1V7007
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1999
$ 283
FUND SOURCE: URBAN TRANSIT DISC. FEDERAL TRANSIT ADMIN FUNDS
FED SHARE $ 226
GA. SHARE $
28
OTH SHARE $
28
CONG DIST. 10
CAPITAL 1997
$
30
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
CLARKE 1V7018
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1998
$
31
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
CLARKE 1V7023
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS I CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1999
$
33
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
OTH SHARE $
3
CLARKE 7D754Z
STATUS:
ATLANTA-ATHENS COMMUTER RAIL LINE-FOR PRELIMINARY - 7D7544
RAIL PROJECTS I PLANNING
FUNDS RECIPIENT: MANAGER: STEVE KISH PRELIMINARY ENGINEERING STUDIES
CONG DIST. 0 & 0
PLANNING NONE
$
0
FUND SOURCE: NON FEDERAL TRANSIT
7D7544 IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
20-Sep-1996 Page 193
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLARKE SR 15 ALT/US 129 FM LAVENDER DR/CLARKE TO SR 330/JACKSON
ATHENS TIP # II-10
PE 1992 UNDERWAY
122160 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 10
ROW 1998 $ 3054
LENGTH(Miles/km): 3.67/5.90503
CONST
AFTER 99
MANAGER: J. GARLAND
FUND SOURCE: SURFACE TRANSPORT.
STATUS: REQ ATHENS/CLARKE AND JACKSON COUNTY DO UTILITIES 11-9-92
FEDERAL HIGHWAY ADMIN FUNDS
12216X IS AN ASSOCIATED PROJECT.
CLARKE 122600
STATUS:
SR 10 RELOC BARNETT SHOALS RD TO ALIGN WITH WINTERVILLE RD TURN LANES / SAFETY
LENGTH(Miles/km): .34/.54706- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: L. OWENS REVISION REQ ATHENS-CLARKE DO UTILITIES 7-11-96.
ATHENS TIP # III-02 CONG DIST. 10 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY
ROW 1997 $ 483
CONST 1998
$
498
FED SHARE $ 448
GA. SHARE $
50
OTH SHARE $
CLARKE 150213
STATUS:
CR 473/EPPS BRIDGE RD & SR 10@ MIDDLE OCONEE RVR,INT.&WALLS BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .00/.00000 MANAGER: B. FERGUSON SEE #150210
ATHENS TIP # IV-03 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1997 $
FED SHARE $ GA. SHARE $ OTH SHARE $
0
0 3785 3028
757
CLARKE 15021X
EPPS BRIDGE RD OVER MCNUTT CREEK/SEE OCONEE-150215
ATHENS TIP # II-03
UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: BRIDGE YROGRAM
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
150215 IS AN ASSOCIATED PROJECT.
CLARKE CR 473/EPPS BR RD FM SR 10/0CONEE TO US 78 ... SEE OCONEE
ATHENS TIP# II-03
PE NONE
$
0
15021Y UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 -EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE $
0
MANAGER: UNKNOWN
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
150210 IS AN ASSOCIATED PROJECT.
CLARKE 170925
STATUS:
BIKEWAY/LANDSCAPING ON EPPS BRIDGE ROAD IN ATHENS
ATHENS TIP # V-01
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 10
LENGTH(Miles/km): 3.00/4.82700 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: B. FERGUSON
FUND SOURCE: TRANS. ENHANCE.
LGPA INCLUDED IN 150210
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1048 838 75 135
"-~'~-"':P
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 194
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ELBERT CR 242/BREWERS BRIDGE RD @ BEAVERDAM CK 2.5 MI N OF ELBERTON
PE 1995 UNDERWAY
142020 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 10
ROW LOCL
LENGTH(Miles/km): .19/.30571
CONST 1999 $ 571
MANAGER: L. OWENS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
457
STATUS: ELBERT COUNTY SGN FOR ROW, UTILITIES & DETOURS 10-30-94
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 114
OTH SHARE $
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P. I. NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
NORTHEAST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
GREENE 221360
STATUS:
SR 12/GREENSBORO FM WALNUT ST TO E OF EAST GREENE ST RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. LENGTH(Mi1es/km): .39/.62751
MANAGER: D. GRIFFITH GREENE SGN DO ROW & UTIL 6-6-88;REQ CITY DO UTIL 8-7-96.
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
GREENE 221610
STATUS:
SR 12/GREENSBORO FM E OF EAST GREENE ST TO EB PASSING LANE
TURN LANES / RECST. OR REHAB.
CONG DIST. 11
LENGTH(Miles/km): 1.10/1.76990- EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GRIFFITH
FUND SOURCE: SURFACE TRANSPORT.
GREENE SGN UTIL 6-28-96; CONFIRM REQ CITY FOR P UTIL 8-7-96
FEDERAL HIGHWAY ADMIN FUNDS
GREENE 222080
STATUS:
SR 15 N/GREENSBORO MP 15.4 - 17.3; MP 21.0 - 22.6 ADDITION OF A PASSING LANE. LENGTH(Miles/km): 3.50/5.63150 MANAGER: D. GRIFFITH
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 195
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1994 UNDERWAY
CONST 1997
$
478
FED SHARE $ 382
GA. SHARE $
96
OTH SHARE $
PE 1992 UNDERWAY
ROW 1994 UNDERWAY CONST 1997 $ 1597
FED SHARE $ 1278 GA. SHARE $ 319 OTH SHARE $
PE 1997
ROW 1999 CONST
$
43
$
10
AFTER 99
GREENE 245100
STATUS:
SR 15 OVER HARRIS BRANCH 9.7 MILES NW OF GREENSBORO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: D. GRIFFITH
GREENE SGN DO UTILITIES 7/12/96.
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW CONST
$
8
AFTER 99
AFTER 99
GREENE 245110
STATUS:
SR 15 OVER FISHING CREEK 7.9 MILES NW OF GREENSBORO REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .30/.48270 MANAGER: D. GRIFFITH GREENE SGN DO UTILITIES 7/12/96.
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW CONST
$
10
AFTER 99
AFTER 99
GREENE 245120
STATUS:
SR 15 OVER TOWN CREEK 5.2 MILES N OF GREENSBORO REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789 MANAGER: D. GRIFFITH GREENE SGN DO UTILITIES 7/12/96.
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW CONST
$
12
AFTER 99
AFTER 99
GREENE 270680
STATUS:
CR 38 @ RICHLAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .10/.16090 MANAGER: D. GRIFFITH GREENE COUNTY SIGNED 6-1-90 FOR ROW, UTILITIES & DETOURS
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1991 UNDERWAY
ROW LOCL
CONST 1997
$
189
FED SHARE $ 151
GA. SHARE $
38
OTH SHARE $
ta/~-:''3~
1$ ~'~'".~J
I;,_~_,:_<.)
w.:::-:-.!.::..-M
~'"c"--'---
\,t,-~' 'C.--)
(_ ~ - .
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 196
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-EA-R-_--------E-S-T-S--
GREENE CR 66/LESLIE MILL RD @ BEAVERDAM CRK
PE 1992
UNDERWAY
270681 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
. CONG DIST. 11
ROW LOCL
LENGTH(Miles/km): .25/.40225
CONST 1997
$
191
MANAGER: D. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
153
STATUS: GREENE COUNTY SIGNED 6-1-90 FOR ROW, UTILITIES & DETOURS
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
38
OTH SHARE $
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 197
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
JACKSON SR 11/US 129 FM E/MIDDLE OCONEE RVR TO CR 236/INCL I-85 BR 110250 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 10
PE 1992 ROW 1995
UNDERWAY UNDERWAY
LENGTH(Miles/km): .45/.72405
CONST 1997
$ 4424
MANAGER: M. GANNAWAY STATUS: DOT TO PAY JACKSON UTL 2/22/94;DOT TO PAY JEFFERSON 4/12/96.
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 3539 GA. SHARE $ 885
121604 IS AN ASSOCIATED PROJECT.
OTH SHARE $
JACKSON 110445
STATUS:
I-85 SIGN MOD FM SR 211 TO SC STATE LN; AND BANKS/FRANKLIN SIGNING / MAINTENANCE LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: KARL ALFF NOT APPLICABLE
CONG DIST. 10 & 6 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 11044Z IS AN ASSOCIATED PROJECT.
PE NONE $ ROW NONE $
CONST 1997 $ FED SHARE $ GA. SHARE $ OTH SHARE $
0 0 1100 1100
JACKSON 121600
STATUS:
SR 11 FM SCL PENDERGRASS TO SR 332 / PART NEW LOCATION RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.30/5.30970 MANAGER: M. GANNAWAY SGN PENDERGRASS 10/91,JEFFERSON 4/91 & JACKSON 4/92 UTIL.
JACKSON 121604
STATUS:
SR 11 FM PROP. JEFFERSON BYP W TO S CITY LIMITS PENDERGRASS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.42/3.89378 MANAGER: M. GANNAWAY JACKSON SGN 6/92 UTIL;DOT TO PAY JEFFERSON 4/12/96.
JACKSON 122150
STATUS:
SR 11 FM SR 332/TALMO TO SR 323/HALL COUNTY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 7.40/11.90660 MANAGER: B. FERGUSON REQ HALL DO UTILITIES 6-6-96;JACKSON SGN DO PUB UTIL 6/18/96
CONG DIST. 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 110250 IS AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 12215X IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW 1998 $ 200 CONST 1999 $ 6000
FED SHARE $ 4800 GA. SHARE $ 1200 OTH SHARE $
PE 1992 UNDERWAY
ROW 1995 UNDERWAY
CONST 1997 $ 4586
FED SHARE $ 3669
GA. SHARE $
917
OTH SHARE $
PE 1992 ROW 1998
CONST
UNDERWAY $ 1985 AFTER 99
JACKSON SR 15 ALT/US 129 FM LAVENDER DR/CLARKE TO SR 330/JACKSON
PE NONE
$
0
12216X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: J. GARLAND
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
122160 IS AN ASSOCIATED PROJECT.
JACKSON 122400
STATUS:
SR 53 NEAR HOSCHTON NB FM MP 6.8-8.4 [N&S OF CR 421] ADDITION OF A PASSING LANE. LENGTH(Miles/km): 1.60/2.57440 MANAGER: L. OWENS JACKSON COUNTY SIGNED FOR PUBLIC UTILITIES ONLY 1-15-96
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW 1998 $
89
CONST 1999 $ 446
FED SHARE $ 357
GA. SHARE $
89
OTH SHARE $
~---
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 198
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
JACKSON SR 15 ALT IN JEFFERSON AT BIG CURRY CREEK
PE 1993 UNDERWAY
122510 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 3 LANES.
CONG DIST. 10
ROW 1998
$
20
LENGTH(Miles/km): .15/.24135
CONST 1999
$
822
MANAGER: L. OWENS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 658
STATUS: CITY OF JEFFERSON REFUSED TO COMMIT FUNDING 11-13-95
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 164
OTH SHARE $
JACKSON 132040
STATUS;
JEFFERSON BYP FM SR15 ALT SE CL/ARCADE NW TO SR11 NEAR CR229 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 6.90/11.10210 MANAGER: L. OWENS SGN JEFFERSON 2/90 UTL,ARCADE PUB UTL 2/92/JACKSON REFUSED
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1997 CONST
UNDERWAY
$ 3168 AFTER 99
JACKSON 132550
STATUS:
SR 11 AT SR 124/GALILEE CHURCH ROAD
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 10
LENGTH(Miles/km): .45/.72405- EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS
FUND SOURCE: HWY. SAFETY
DOT TO PAY JACKSON PRIVATE UTILITIES 3/4/96.
FEDERAL HIGHWAY ADMIN FUNDS
JACKSON 171000
STATUS:
CR 184 @ WALNUT CREEK 4 MI NORTH OF BRASELTON REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. LENGTH(Miles/km): .20/.32180 MANAGER: L. OWENS JACKSON SGN 10-18-93 ROW, UTILTIES & DETOURS
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
JACKSON 171001
STATUS:
CR 269 @ CANDLER CREEK 8.5 MI NE OF TALMO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180
MANAGER: L. OWENS JACKSON SGN 10-18-93 ROW, UTILITIES & DETOURS
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
JACKSON 171002
STATUS:
CR 367/WHITES BOTTOM ROAD @ WALNUT CREEK NE OF BRASELTON REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. LENGTH(Miles/km): .20/.32180
MANAGER: L. OWENS JACKSON SGN 10-18-93 ROW, UTILITIES & DETOURS
CONG DIST. 10
FUND SOURCE: BP.IDG"' PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
JACKSON 171070
STATUS:
HISTORIC JACKSON CO COURTHOUSE LANDSCAPING IN JEFFERSON LANDSCAPING / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT
CONG DIST. 10 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW LOCL
CONST 1997 $ 939
FED SHARE $ 845
GA. SHARE $
94
OTH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1997
$
299
FED SHARE $ 239
GA. SHARE $
60
OTH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1997
$
399
FED SHARE $ 319
GA. SHARE $
80
OTH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1997
$
353
FED SHARE $ 282
GA. SHARE $
71
OTH SHARE $
PE LOCL
ROW LOCL
CONST 1997
$
179
FED SHARE $ 143
GA. SHARE $
OTH SHARE $
36
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 199
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C--T--D-A-T-A---------R-E-G-IO-N-A--L--D-E-V-E-LO-P-M--EN--T--C-O-M-M--IS-S-IO-N--------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
MORGAN I-20 REST AREA 52 & 53 UPGRADE REST AREA
PE 1994
UNDERWAY
210560 REST AREA / RECST. OR REHAB.
CONG DIST. 10
ROW 1996 UNDERWAY
LENGTH(Miles/km): .30/.48270- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1998
$ 7617
MANAGER: J. GARLAND
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 6094
STATUS: DOT TO PAY 1-21-94
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1523
OTH SHARE $
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
NORTHEAST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
NEWTON 210530
STATUS:
I-20 @ SR 142-12/COVINGTON (INCL RELOC OF FRONTAGE RD/CR 72)
INTERCHANGE / RECST. OR REHAB.
CONG DIST. 10
LENGTH(Miles/km): .71/1.14239 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: D. CHURCH
FUND SOURCE: I-STATE MAINT.
REQ COVINGTON DO UTILITIES 10/92; NEWTON SGN 10-27-92 UTIL
FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 200
FISCAL YEAR
COST ESTS
PE 1993 ROW 1999 CONST
UNDERWAY $ 3754 AFTER 99
NEWTON 210640
STATUS:
I-20 AT GA. RR, ALCOVY RD, ALCOVY RVR & OVERFLOW BRIDGES / RECST. OR REHAB. LENGTH(Miles/km): .93/1.49637 MANAGER: G. ROSS REQ COVINGTON DO UTIL 10-5-93; NEWTON SGN 10-13-93 UTILITIES
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
NEWTON 222040
STATUS:
SR 36/COVINGTON FM OLD MONTICELLO RD TO CR 348/PETTY ST
TURN LANES / RECST. OR REHAB.
CONG DIST. 10
LENGTH(Miles/km): 1.10/1.76990- EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GRIFFITH
FUND SOURCE: SURFACE TRANSPORT.
NEWTON SGN PUBLIC UTIL 10-7-93; COVINGTON REFUSED 10-1-92
FEDERAL HIGHWAY ADMIN FUNDS
NEWTON 231220
STATUS:
SR 142 FM S OF SR 12/US 278 NORTH TO N OF CR 75 IN COVINGTON RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.07/1.72163 MANAGER: D. CHURCH
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1997
$ 2303
FED SHARE $ 2073
GA. SHARE $
230
OTH SHARE $
PE 1993 UNDERWAY
ROW 1995 UNDERWAY
CONST 1999
$ 1001
FED SHARE $
801
GA. SHARE $
200
OTH SHARE $
PE 1998 ROW 1999 CONST
$
67
$ 266
AFTER 99
NEWTON 271010
STATUS:
CR 263/CONLEY DITCH ROAD @ LAKE JACKSON 10 MI S OF COVINGTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: D. GRIFFITH NEWTON SGN FOR ROW, UTILITIES & DETOURS 10-11-94
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996
UNDERWAY
ROW LOCL
CONST 1998
$
444
FED SHARE $ 355
GA. SHARE $
89
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
NORTHEAST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
OCONEE 141970
STATUS:
SIMONTON BRIDGE RD FM US 441 IN WATKINSVILLE TO CLARKE CL
ATHENS TIP # II-05
MINOR WIDEN & RESURF / RECST. OR REHAB.
CONG DIST. 10
LENGTH(Miles/km): 2.50/4.02250 -EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: L. OWENS
FUND SOURCE: SURFACE TRANSPORT.
OCONEE SGN DO ROW, UTIL 4-30-96;REQ CITY DO R, U 12-29-95.
FEDERAL HIGHWAY ADMIN FUNDS
OCONEE 141980
STATUS:
MARS HILL RD/CR 263 FM US 78 TO SR 53
ATHENS TIP # II-04
MINOR WIDEN & RESURF / RECST. OR REHAB.
CONG DIST. 10
LENGTH(Miles/km): 5.59/8.99431 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: L. OWENS
FUND SOURCE: SURFACE TRANSPORT.
OCONEE SGN DO ROW & UTILITIES 6-4-96.
FEDERAL HIGHWAY ADMIN FUNDS
OCONEE 142030
STATUS:
MARS HILL RD/CR 263 FM DIALS MILL RD TO us 78
MINOR WIDEN & RESURF / RECST. OR REHAB.
CONG DIST. 10
LENGTH(Miles/km): 2.70/4.34430- EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: L. OWENS
FUND SOURCE: SURFACE TRANSPORT.
OCONEE SGN DO ROW,UTIL & DET 4-2-96;REQ BOGART R,U,D 3-6-96
FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 201
FISCAL YEAR
COST ESTS
PE 1996 UNDERWAY
ROW LOCL
CONST 1999
$
600
FED SHARE $ 480
GA. SHARE $ 120
OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1999 $ 180
FED SHARE $ 144
GA. SHARE $
36
OTH SHARE $
PE 1997 ROW LOCL CONST
$
7
AFTER 99
OCONEE 150210
STATUS:
CR 473/EPPS BRIDGE RD FM SR 10 TO SR lOBUS/US 78/CLARKE CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.10/4.98790 MANAGER: B. FERGUSON CLARKE SGN 2/95 PE/ROW/UTIL/CST-$1,426,500;0CONEE SGN 11/94
OCONEE 150215
STATUS:
EPPS BRIDGE RD OVER MCNUTT CREEK/SEE CLARKE CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .50/.80450 MANAGER: B. FERGUSON CLARKE SGN PE,ROW,UTL& PART CST 2/95;0CONEE SGN 11/94;150210
OCONEE 245130
STATUS:
SR 15 OVER ROSE CREEK 7.5 MILES SE OF FARMINGTON REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007 MANAGER: D. GRIFFITH OCONEE SGN DO UTIL 8/6/96, LIABILITY NOT EXCEED $5,000.
ATHENS TIP # II-01 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 15021Y IS AN ASSOCIATED PROJECT.
ATHENS TIP # IV-02 CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 15021X IS AN ASSOCIATED PROJECT.
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1996 UNDERWAY
CONST 1997 $ 9103 FED SHARE $ 7282 GA. SHARE $ 1821 OTH SHARE $
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1997
$
797
FED SHARE $
638
GA. SHARE $
159
OTH SHARE $
PE 1998 ROW CONST
$
11
AFTER 99
AFTER 99
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
L~" ~~","
C..
~--
,;:_I
E:::::..:.:- _)
t::oC
"-'~'
')
l.,",
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 202
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------C-OM--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
OGLETHOR SR 22 @ BROOKS CREEK 2.5 MI S OF LEXINGTON
PE 1997 UNDERWAY
242315 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Mi1es/km): .21/.33789
CONG DIST. 10
ROW 1999 CONST
$
11
AFTER 99
MANAGER: D. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
STATUS: OGLETHORPE SIGNED FOR UTILITIES 5-16-95
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 203
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
NORTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
WALTON SR 81 AT MONROE YOUTH/CENTERHILL CHURCH ROAD
PE NONE
$
0
122560 TURN LANES / SAFETY
CONG DIST. 10
ROW LOCL
LENGTH(Miles/km): .59/.94931- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1997
$
490
MANAGER: L. OWENS
FUND SOURCE: HWY. SAFETY
FED SHARE $ 441
STATUS: WALTON SGN 12-11-95 FOR ROW & UTILITIES WITH STIPULATION
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
49
OTH SHARE $
WALTON 132620
STATUS:
SR 20 AT SR 81 IN LOGANVILLE
TURN LANES / SAFETY
CONG DIST. 10
LENGTH(Miles/km): .22/.35398- EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: L. OWENS
FUND SOURCE: HWY. SAFETY
LOGANVILLE SGN FOR ROW & UTILITIES 5-2-95
OTO
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1998
$
91
FED SHARE $
82
GA. SHARE $
9
OTH SHARE $
WALTON 171170
STATUS:
CR 289/BEARDEN ROAD @ JACKS CREEK 1.2 MI NW OF GOOD HOPE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .37/.59533 MANAGER: L. OWENS WALTON SGN DO ROW, UTILITIES & DETOURS 9-28-94
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY
ROW LOCL
CONST 1998
$
427
FED SHARE $
342
GA. SHARE $
85
OTH SHARE $
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
f
i
t"
SOUTH GEORGIA REGIONAL DEVELOPMENT CENTER
Ben Hill Berrien Brooks
Cook Echols Irwin Lanier Lowndes
Tift Turner
ston
!CKDTS1
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 204
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTH GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BEN HILL CR 245 ~ WILLACHOOCHEE CREEK ~p 1 MI EAST OF JCT SR 107
PE 1997
$
ll
431180 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 8
ROW LOCL
LENGTH(Miles/km): .22/.35398
CONST
AFTER 99
MANAGER: J. SHEFFIELD
FUND SOURCE: BRIDGE PROGRAM
STATUS: BEN HILL SGN DO ROW, UTIL & DET 4-22-96.
FEDERAL HIGHWAY ADMIN FUNDS
BEN HILL SR 107/US 319 OVER STURGEON CREEK NEAR CR 5 442580 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .75/1.20675 MANAGER: J. SHEFFIELD STATUS: BEN HILL SGN FOR UTILITIES 11-15-95
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
BEN HILL EVERGREEN CEMETERY ROAD OVER TURKEY CREEK IN FITZGERALD 450420 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .09/.14481 MANAGER: J. SHEFFIELD STATUS: DOT TO PAY 2-29-96.
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1994 UNDERWAY
ROW 1997 UNDERWAY
CONST 1998
$
689
FED SHARE $ 551
GA. SHARE $ 138
OTH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1997 $ 206
fED SHARE $ 165
GA. SHARE $
41
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
SOUTH GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
BROOKS 421720
STATUS:
SR 133 FM W/CR 276 TO E. OF WITHLACOOCHEE RVR/LOWNDES RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.80/2.89620 MANAGER: K. FULBRIGHT BROOKS SGN FOR UTIL 9-5-95; LOWNDES SGN FOR UTIL 12-5-90
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 42172X IS AN ASSOCIATED PROJECT.
BROOKS 421722
STATUS:
SR 133 @ LITTLE; WITHLACOOCHEE RVR & OFLW & LOWNDES REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: K. FULBRIGHT BROOKS SGN DO UTIL 2-13-96; LOWNDES SGN 12/5/90 UTIL.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 42172Y IS AN ASSOCIATED PROJECT.
BROOKS 422510
STATUS:
SR 38/US 84-221 BRIDGE CULVERT APPROX. 2 MI. E. OF QUITMAN BRIDGES / NEW CONSTRUCTION LENGTH(Miles/km): .50/.80450 MANAGER: J. SHEFFIELD BROOKS SGN DO UTILITIES 2-13-96.
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
BROOKS 442680
STATUS:
CR 275 @ CAT CREEK APPROXIMATELY 4 MILES SOUTH OF DIXIE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: J. SHEFFIELD CO SGN DO ROW, UTILITIES & DETOURS 1-9-96.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 442682 IS AN ASSOCIATED PROJECT.
BROOKS 442682
STATUS:
CR 275 @ PISCOLA CREEK APPROXIMATELY 2.5 MILES SE OF DIXIE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398 MANAGER: J. SHEFFIELD CO SGN DO ROW, UTILITIES & DETOURS 1-9-96.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 442680 IS AN ASSOCIATED PROJECT.
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 205
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$ 3000
FED SHARE $ 2400
GA. SHARE $
600
OTH SHARE $
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1997
$ 6550
FED SHARE $ 5240
GA. SHARE $ 1310
OTH SHARE $
PE 1997 $
10
ROW NONE $
0
CONST 1997 $ 529
FED SHARE $ 423
GA. SHARE $ 106
OTH SHARE $
PE 1995 UNDERWAY
ROW LOCL
CONST 1999 $ 127
FED SHARE $ 102
GA. SHARE $
25
OTH SHARE $
PE 1995 UNDERWAY
ROW LOCL
CONST 1999
$
781
FED SHARE $ 625
GA. SHARE $ 156
OTH SHARE $
L
E-:~- ::;
....... ~--:::...-;:'4
!/;!"- -22'-:J
(,_-"<::.._.::.,,_
Iii:~-
~~ -~- - J
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 206
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTH GEORGIA
FISCAL
COST
-P--. I-.-N--O-. ---------------P-R--O-JE-C-T---D-A-T-A---------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COOK
I-75 @ SR 37/ADEL [FM 1500 FT WEST TO 650 FT EAST I-75]
PE 1992 UNDERWAY
410420 INTERCHANGE / RECST. OR REHAB.
CONG DIST. 8
ROW 1997 $ 100
LENGTH(Miles/km): .60/.96540- EXIST. LANES: 2 /PROPOSED LANES: 5
CONST 1998 $ 3071
MANAGER: J. GARLAND
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 2764
STATUS: ADEL REF UTILITIES 6-29-92;COUNTY TABLED LGPA 11-13-91.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 307
OTH SHARE $
COOK 410530
STATUS:
I-75 FM CR 246/COOK TO CR 204 IN TIFT COUNTY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): 10.23/16.46007 MANAGER: B. FERGUSON REQ COOK, LENOX & TIFT DO UTILITIES 10-30-91
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 41053X IS AN ASSOCIATED PROJECT.
PE 1993
ROW 1998 CONST
UNDERWAY
$ 4800 AFTER 99
COOK 410600
STATUS:
I-75 REST AREAS #5 & 6 UPGRADE REST AREA
REST AREA / RECST. OR REHAB.
CONG DIST. 8
LENGTH(Miles/km): 1.89/3.04101 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. GARLAND
FUND SOURCE: UNKNOWN
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
COOK 410620
STATUS:
I-75 R/W FOR HEART PINE & CECIL BAY WETLANDS WATER POLLUTION MITIG. / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: MANAGER: J. SHEFFIELD NOT APPLICABLE
- MITIGATION 0 /PROPOSED LANES:
CONG DIST. 8 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1996 UNDERWAY
CONST 1998 $ 7079
FED SHARE $ 5663 GA. SHARE $ 1416 OTH SHARE $
PE NONE $
0
ROW 1997
$
300
CONST NONE $
0
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 207
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTH GEORGIA
FISCAL
COST
-P--. -I.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-EV--EL-O-P-M--EN-T---C-O-M-M--IS-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ECHOLS CR 120 @ ALAPAHA RIVER APP 2 MI EAST OF HOWELL
PE 1997
$
10
442760 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
CONG DIST. 8
ROW LOCL
LENGTH(Miles/km): .26/.41834 MANAGER: J. SHEFFIELD STATUS: REQ ECHOLS DO ROW, UTIL & DET 7/3/96.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONST 1998
$
80
FED SHARE $
64
GA. SHARE $
16
OTH SHARE $
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
"
'J
_. _-)
''-.)
1<<-,:~
J
~-
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 208
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTH GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
LOWNDES SR 133 FM W/CR 276 TO E. OF WITHLACOOCHEE/ SEE BROOKS-421720
PE NONE
$
0
42172X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: K. FULBRIGHT
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
421720 IS AN ASSOCIATED PROJECT.
LOWNDES 42172Y
SR 133 @ LITTLE; WITHLACOOCHEE RVR & OFLW; SEE BROOKS-421722
UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: K. FULBRIGHT
FUND SOURCE: BRIDGE PROGRAM
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
421722 IS AN ASSOCIATED PROJECT.
LOWNDES 422290
STATUS:
SR 125 FM CR 867 TON. OF HIGHTOWER RD/MOODY AFB N GATE RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. LENGTH(Miles/km): 8.73/14.04657
MANAGER: J. GRAYBEAL LOWNDES SGN 12-6-95 UTIL;VALDOSTA REFUSED PUBLIC UTL 9-9-94
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1996 UNDERWAY
CONST 1998
$ 9267
FED SHARE $ 7414
GA. SHARE $ 1853
OTH SHARE $
LOWNDES 431680
STATUS:
SR 7/US 41 AT CR 570 AND CR 868/HAHIRA RD
INTERSECTION IMPROVEMENT / SAFETY
CONG DIST. 2
LENGTH(Miles/km): .66/1.06194 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: J. SHEFFIELD
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
PE 1999 ROW LOCL CONST
$
10
AFTER 99
LOWNDES 442565
STATUS:
OLD CLYATTVILLE RD/CR 785 OVER MUD CREEK IN VALDOSTA REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .20/.32190 MANAGER: J. SHEFFIELD CO SGN 12-6-95 & VALDOSTA SGN 4-21-95 FOR ROW, UTIL & DETOUR
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
LOWNDES 442780
STATUS:
CR 777/CAT CREEK ROAD @ CAT CREEK OVERFLOW SW OF BARRETTS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789
MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW LOCL
CONST 1997
$
709
FED SHARE $
567
GA. SHARE $
142
OTH SHARE $
PE 1998 ROW LOCL CONST
$
10
AFTER 99
LOWNDES 442790
STATUS:
CR 777/CAT CREEK ROAD @ CAT CREEK APP 3 MI SW OF BARRETTS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .22/.35398
MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1999
ROW LOCL CONST
$
11
AFTER 99
COUNTY
p" ~ 'J..l<"
DESCRIPTION
r: .. .-- ......~ .... .:. --..ci..i..li.
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
.S0UrrP GEORGI
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
LOWNDES 450430
STATUS:
SR 7/US 41 AT JAMES BECK OVERPASS IN VALDOSTA INTERSECTION IMPROVEMENT / SAFETY LENGTH{Miles/km): .20/.32180- EXIST. LANES: 4 /PROPOSED LANES: MANAGER: J. SHEFFIELD
VALDOSTA SGN FOR UTIL 5-20-93;LOWNDES NO INVOLVED UTILITIES
CONG DIST. 2 4
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
LOWNDES 450450
STATUS:
N OAK ST FM BAYTREE RD TO 500' N BAYTREE FOR RIGHT TURN LN
TURN LANES / SAFETY
CONG DIST. 2
LENGTH(Miles/km): .32/.51488- EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: J. SHEFFIELD
FUND SOURCE: HWY. SAFETY
VALDOSTA SGN ROW & UTIL 5-20-93;LOWNDES NO INV UTILITIES.
FEDERAL HIGHWAY ADMIN FUNDS
* ~ FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996
Fag<" 209
FISCAL YEAR
COST ESTS
PE 1996 UNDERWAY
ROW 1995 UNDERWAY
CONST 1997
$
208
FED SHARE $ 187
GA. SHARE $
21
OTH SHARE $
PE NONE
$
0
ROW LOCL
CONST 1997
$
131
FED SHARE $ 118
GA. SFFo?::S $
13
OTH SHARE $
~~---'
'5~~-:"':'::".J
~~~;;~
~<E.J:n~~;
~-...c.:~_-;;J
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 210
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTH GEORGIA
FISCAL
COST
-P--. I-.-N--O-. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
TIFT
I-75 FM CR 246/COOK TO CR 204/TIFT .. SEE COOK COUNTY- 410530
PE NONE
$
0
41053X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE $
0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0 .
CONST NONE $
0
MANAGER: UNKNOWN
FUND SOURCE: NAT'L HIGHWAY
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
410530 IS AN ASSOCIATED PROJECT.
TIFT 422170
STATUS:
SR 125/TIFTON FM 20TH ST TO 40TH ST
TURN LANES / SAFETY
CONG DIST. 8
LENGTH(Miles/km): 1.10/1.76990- EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: J. SHEFFIELD
FUND SOURCE: SURFACE TRANSPORT.
REQ TIFTON DO UTILITIES 10-20-92;TIFT NO INVOLVED UTILITIES.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1998 $
50
CONST 1999 $ 1963
FED SHARE $ 1570
GA. SHARE $ 393
OTH SHARE $
TIFT 422320
STATUS:
SR 520/US 82 FM MAGNOLIA DR EAST TO CENTRAL AVE/TIFTON RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. LENGTH(Miles/km): .95/1.52855 MANAGER: J. SHEFFIELD CITY SGN DO UTILITIES UP TO $75K 2-27-96.
TIFT 431700
STATUS:
SR 35/US 319 OVER ALAPAHA RIVER @ TIFT-IRWIN COUNTY LINE
REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .24/.38616
MANAGER: J. SHEFFIELD REQ TIFT DO UTIL 12-7-95; IRWIN SGN UTIL 12-14-95
CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 UNDERWAY
ROW 1998 $ 750 CONST 1999 $ 1009
FED SHARE $ 807 GA. SHARE $ 202 OTH SHARE $
PE 1998
ROW CONST
$
10
AFTER 99
AFTER 99
TIFT 471221
STATUS:
TIFTON BIKE LANES, SIDEWALKS AND HIKING TRAILS
BICYCLE/FED. FACILITY / ENHANCEMENT
CONG DIST. 8
LENGTH(Miles/km): 20.17/32.45353 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL ROW LOCL CONST 1998 $
FED SHARE $
GA. SHARE $ OTH SHARE $
1065 852
213
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
SOUTH GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
TURNER 410245
STATUS:
I-75 FM TIFT COUNTY LINE TO SR 159; & 41Y245 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 11.10/17.85990 MANAGER: B. FERGUSON TURNER SGN 4-20-92 UTILITIES; ASHBURN SGN 6-12-92 PUB UTIL
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 41Y245 IS AN ASSOCIATED PROJECT.
TURNER 410250
STATUS:
I-75 FM SR 159 NEAR ASHBURN TO 1-MI S OF CR 117/CRISP&"Y" RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. L~NGTH(Miles/km): 16.50/26.54850
MANAGER: B. FERGUSON REQ TURNER AND CRISP DO UTILITIES 4-8-92.
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 41025X IS AN ASSOCIATED PROJECT.
TURNER 410590
STATUS:
I-75 RA 9 & 10 UPGRADE REST AREA
REST AREA / RECST. OR REHAB.
CONG DIST. 8
LENGTH{Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. GARLAND
FUND SOURCE: I-STATE MAINT.
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
TURNER 431300
STATUS:
SR 32 OVER LITTLE SAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): 1.00/1.60900 MANAGER: J. SHEFFIELD TURNER COUNTY SIGNED FOR UTILITIES 8-1-95
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TURNER 431570
STATUS:
SR 112 @ LITTLE RIVER 3 MILES WEST OF SYCAMORE REHABILITATION OF THE EXISTING BRIDGE{S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: J. SHEFFIELD TURNER COUNTY SIGNED FOR UTILITIES 2-7-95
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 211
FISCAL YEAR
COST ESTS
PE 1995 ROW 1998 CONST
UNDERWAY $ 3000 AFTER 99
PE 1987 ROW 1997 CONST
UNDERWAY $ 13000 AFTER 99
PE 1994 UNDERWAY
ROW 1996 UNDERWAY
CONST 1999
$ 9055
FED SHARE $ 8150
GA. SHARE $
906
OTH SHARE $
PE 1995 UNDERWAY
ROW 1997
$
1
CONST 1998
$
385
FED SHARE $
308
GA. SHARE $
77
OTH SHARE $
PE 1996 ROW 1999 CONST
UNDERWAY
$
10
AFTER 99
TURNER 431580
STATUS:
SR 112 @ ASHBURN BRANCH 1.6 MILES SW OF ASHBURN REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: J. SHEFFIELD TURNER COUNTY SIGNED FOR UTILITIES 2-7-95
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW 1999 CONST
UNDERWAY
$
10
AFTER 99
TURNER 431590
STATUS:
SR 112 @ DANIELS CREEK SOUTHWEST OF ASHBURN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .19/.30571 MANAGER: J. SHEFFIELD TURNER SGN FOR UTILITIES 2-16-95; ASHBURN NOT APPLICABLE
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 ROW 1999 CONST
UNDERWAY
$
1
AFTER 99
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 212
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTH GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
TURNER SR 112 @ BIG BRANCH 6.1 MILE SOUTHWEST OF SYCAMORE
PE 1996 UNDERWAY
431600 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
CONG DIST. 8
ROW 1999
$
10
LENGTH(Miles/km): .20/.32180
CONST
AFTER 99
MANAGER: J. SHEFFIELD
FUND SOURCE: BRIDGE PROGRAM
STATUS: TURNER COUNTY SIGNED FOR UTILITIES 2-7-95
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
SOUTHEAST GEORGIA REGIONAL DEVELOPMENT CENTER
Atkinson Bacon
Brantley Charlton
Clinch Coffee Pierce Ware
l
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 213
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BACON SR 32/ALMA @ HURRICANE CREEK
PE NONE
$
0
520910 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
CONG DIST. 1
ROW NONE
$
0
LENGTH(Miles/km): .08/.12872
CONST 1997
$ 1329
MANAGER: TONY COLLINS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 1063
STATUS: BACON SIGNED UTILITIES 6-17-91
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
266
OTH SHARE $
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P. I. NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
SOUTHEAST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
BRANTLEY CR 11 @ MILL CREEK WEST OF HOBOKEN 570925 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Mi1es/km): .20/.32180 MANAGER: TONY COLLINS STATUS: BRANTLEY SGN DO ROW, UTILITIES & DETOURS 10-19-93
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 214
FISCAL YEAR
COST
PE 1994 UNDERWAY
ROW LOCL
CONST 1998 $ 243
FED SHARE $ 194
GA. SHARE $
49
OTH SHARE $
COUNTY P. I. NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
SOUTHEAST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CHARLTON SR 94 OVER ST MARYS RIVER AT FLORIDA STATE LINE 531300 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .60/.96540 MANAGER: TONY COLLINS STATUS: BI-STATE AGREEMENT SGN BY FLORIDA 5/1/96.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 215
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1997
$
2
CONST 1998
$ 2742
FED SHARE $ 1371
GA. SHARE $
OTH SHARE $ 1371
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 216
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLINCH SR 38/US 84 @ SUWANNOOCHEE CREEK
PE 1992
UNDERWAY
422055 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
CONG DIST. 8
ROW NONE $
0
LENGTH(Miles/km): .20/.32180
CONST 1998
$ 1245
MANAGER: KEVIN HOSEY STATUS: REQ LANIER & CLINCH DO UTILITIES 6-3-92
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $
996
GA. SHARE $ 249
42205Y IS AN ASSOCIATED PROJECT.
OTH SHARE $
CLINCH 442715
STATUS:
SR 177 @ SWEETWATER CREEK TO STEPHEN C FOSTER ST PARK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007 MANAGER: J. SHEFFIELD CLINCH SGN FOR UTILITIES 5-18-95; NO UTIL INVOLVED 5-18-95
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1997 UNDERWAY
ROW 1998 $
10
CONST 1999
$
460
FED SHARE $ 368
GA. SHARE $
92
OTH SHARE $
"'-
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 217
PROJECT LISTING BY ROC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHEAST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COFFEE SR 32/DOUGLAS FM W CL TO E/SR 206 .. INCL 1-WAY PAIR 421340 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 8
PE 1992 ROW 1995
UNDERWAY UNDERWAY
LENGTH(Miles/km): 3.57/5.74413
CONST 1999 $ 4402
MANAGER: M. REYNOLDS STATUS: CITY OF DOUGLAS SIGNED 5/8/89 FOR UTILITIES.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 3522 GA. SHARE $ 880
OTH SHARE $
COFFEE 421345
STATUS:
SR 32 FM W/CR 296 EAST TO WEST CITY LIMITS OF DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.13/6.64517 MANAGER: M. REYNOLDS COUNTY SGN UTIL 11-19-91;CITY/DOUGLAS SGN UTIL 11-1-91.
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1997 CONST
UNDERWAY $ 3947 AFTER 99
COFFEE 422350
STATUS:
SR 135 AT MCDONALD ROAD IN DOUGLAS
TURN LANES / SAFETY
CONG DIST. 8
LENGTH(Miles/km): .74/1.19066 -EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: J. SHEFFIELD
FUND SOURCE: NAT'L HIGHWAY
CITY OF DOUGLAS SGN FOR ROW, UTILITIES 7-19-94
OTO
FEDERAL HIGHWAY ADMIN FUNDS
COFFEE 431610
STATUS:
SR 158 @ CR 553/MCDONALD RD IN DOUGLAS TURN LANES / SAFETY LENGTH(Miles/km): .50/.80450- EXIST. LANES: 4
MANAGER: J. SHEFFIELD CITY/DOUGLAS SGN 10-24-94 FOR ROW & UTILITIES
/PROPOSED
LANES:
CONG DIST. 8 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
COFFEE 442600
STATUS:
SR 158 AT SHIRLEY AVENUE IN DOUGLAS
TURN LANES / SAFETY
CONG DIST. 8
LENGTH(Miles/km): .50/.80450- EXIST. LANES: 4 /PROPOSED LANES: 5
MANAGER: J. SHEFFIELD
FUND SOURCE: HWY. SAFETY
CITY OF DOUGLAS SGN ROW & UTILITES 7-19-94.
OTO
FEDERAL HIGHWAY ADMIN FUNDS
COFFEE 450380
STATUS:
SR 206/PERIMETER RD FM SR 32 TO SR 31 IN DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 1.80/2.89620
MANAGER: J. SHEFFIELD COFFEE SGN 10-14-93 PUBLIC UTIL; DOUGLAS SGN 10-11-93 UTIL
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COFFEE 471080
STATUS:
CR 598 OVER BEAR CREEK @ HILLARDS LAKE 5 MILES SW OF DOUGLAS REPLACEMl."~l'J' 0F ~!II!' EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Milea/i<mj: .20/.32180 MANAGER: J. SHEFFIELD COFFEE SGN DO ROW, UTIL & DETOURS 9-29-94.
CONG DIST. 8
FUND SOURCE: PRTDGE PROGRAM FEDERAL HIGHWAY ADMIN FlJl~L;;:;
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1994 UNDERWAY ROW LOCL CONST 1997 $ 239
FED SHARE $ 239 GA. SHARE $ OTH SHARE $
PE 19-95 UNDERWAY
ROW LOCL
CONST 1997
$
157
FED SHARE $ 141
GA. SHARE $
16
OTH SHARE $
PE 1994 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$
173
FED SHARE $
173
GA. SHARE $
OTH SHARE $
PE 1992 UNDERWAY
ROW 1995 UNDERWAY
CONST 1999 $ 2255 FED SHARE $ 1804 GA. SHARE $ 451 OTH SHARE $
PE 1995 UNDERWAY
ROW LOCL
CONST 1997
$
181
FED SHARE $ 145
GA. SHARE $
36
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 218
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHEAST GEORGIA
FISCAL
COST
P.I.NO.
PROJECT DATA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
-----------------------------------------------------------------------------------------------------------------
Y-E-A-R--------E--ST--S--
COFFEE RESTORE RR DEPOT & ASHLEY-SLATER HOUSE FOR MUSEUM & WELCOME
_, l9':J7
y
100
471220 HISTORIC FACILITIES / ENHANCEMENT
rn1--1r; r.~~rr
ROW LOCL
LENGTH(Miles/km): .00/.00000- ,... ~,..m ---, _, 1 i:'b.Vl?OSED LAN!":';; v
CONST 1997
$ 1000
Hl'."J;rq~~n
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $
800
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
OTH SHARE $
200
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
~~:..:J
COUNTY P. I . NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
SOUTHEAST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
PIERCE 532470
STATUS:
SR 15 OVER BURNEY BRANCH IN BLACKSHEAR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .23/.37007 MANAGER: TONY COLLINS REQ CITY DO UTILITIES & COUNTY DO PUBLIC UTIL 9-21-94
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 219
FISCAL YEAR
COST ESTS
PE 1994
UNDERWAY
ROW 1996 UNDERWAY
CONST 1998
$
552
FED SHARE $
442
GA. SHARE $
110
OTH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1997/FY 1999
SOUTHEAST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
WARE 521530
STATUS:
SR 4BU/US1/WAYCROSS FM N/BLACKSHEAR AV TO CR 465 @ JAMESTOWN RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.30/2.09170 MANAGER: TONY COLLINS REV REQ WARE DO UTILITIES 8/15/96.
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
WARE 522060
STATUS:
US82/84 CONN. FM CORRIDOR Z TO US 84/FRANCIS ST.
RAMP / NEW CONSTRUCTION
CONG DIST. 1
LENGTH(Miles/km): .10/.16090- EXIST. LANES: 4 /PROPOSED LANES: 5
MANAGER: TONY COLLINS
FUND SOURCE: NAT'L HIGHWAY
REQ CITY OF WAYCROSS DO UTILITIES 10-31-95
FEDERAL HIGHWAY ADMIN FUNDS
WARE 570970
STATUS:
ALONG SR 4 FROM L.S. WALKER SP TO WAYCROSS & LANDSCAPING BICYCLE/PED. FACILITY / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: C. CARTER LGPA TO BE DONE BY CONTRACT
CONG DIST. 1 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 220
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1998 $ 1500 CONST 1999 $ 2140
FED SHARE $ 1712 GA. SHARE $ 428 OTH SHARE $
PE 1996 UNDERWAY
ROW LOCL
CONST 1998 $ 121
FED SHARE $
97
GA. SHARE $
24
OTH SHARE $
PE LOCL
ROW NONE $ CONST 1997 $
FED SHARE $
GA. S~ARE $ OTH SHARE $
0 1250 1000
250
SOUTHWEST GEORGIA REGIONAL DEVELOPMENT CENTER
Baker Calhoun Colquitt Decatur Dougherty
Early Grady
Lee Miller Mitchell Seminole Terrell Thomas Worth
SOUTHWEST GEORGIA
10 0
10
SCALE IN MILES
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 221
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BAKER
SR 91 @ ICHAWAYNOCHAWAY CREEK APP 3 MI N OF JCT SR 253
PE 1998
$
13
431710 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
CONG DIST. 2
ROW
AFTER 99
LENGTH(Miles/km): .30/.48270
CONST
AFTER 99
MANAGER: J. SHEFFIELD
FUND SOURCE: BRIDGE PROGRAM
STATUS: BAKER SGN DO UTILITIES 4-16-96.
FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 222
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-E-G-IO-N-A-L--D--EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
CALHOUN SR 37 @ KEEL CREEK 3 MI S OF LEARY
PE 1997
UNDERWAY
431650 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .21/.33789
CONG DIST. 2
ROW 1998 CONST
$
11
AFTER 99
MANAGER: J. SHEFFIELD
FUND SOURCE: BRIDGE PROGRAM
STATUS: CALHOUN SIGNED FOR UTILITIES 5-15-95
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 223
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
FISCAL
COST
-P--. I-.-N--O-. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COLQUITT SR 37 @ LITTLE CREEK 5 MILES WEST OF JCT SR 111
PE 1996 UNDERWAY
431540 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 2
ROW 1998 $
1
LENGTH(Miles/km): .50/.80450
CONST 1999
$
442
MANAGER: J. SHEFFIELD
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 354
STATUS: COLQUITT COUNTY SIGNED FOR UTILITIES 11-21-94
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
88
OTH SHARE $
COLQUITT CR 493/FUNSTON-SALE CITY @ LITTLE CREEK APP 1 MI NW FUNSTON 442750 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: J. SHEFFIELD STATUS: COLQUITT SIGNED FOR ROW, UTILITIES & DETOURS 12-18-95
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW LOCL CONST
$
10
AFTER 99
COLQUITT FM LOWER MEIGS RD IN MOULTRIE S TO US 319 BP AND TO AIRPORT 471030 BICYCLE/FED. FACILITY / ENHANCEMENT
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: STEVE YOST STATUS: LGPA TO BE DONE BY CONTRACT
CONG DIST. 8 & 2 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW NONE
$
0
CONST 1997
$
568
FED SHARE $
454
GA. SHARE $
OTH SHARE $ 114
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 224
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A-L---D-E-V-EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DECATUR SR 38/US 84 EBL @ SPRING CREEK IN WEST SECTION OF BRINSON
PE 1996
UNDERWAY
422520 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 2
ROW 1998
$
1
LENGTH(Mi1es/km): .31/.49879
CONST 1999
$ 1269
MANAGER: J. SHEFFIELD
.FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 1015
STATUS: BRINSON SGN DO UTILITIES 5-15-96;DECATUR SGN DO UTL 11-28-95
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
254
OTH SHARE $
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 225
PROJECT LISTING BY ROC FY 1997IFY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
FISCAL
COST
-P--.I-.-N--O-. ---------------P-R-O--JE-C-T---D-A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGHERT 4D1015
TRANSIT TRANSIT
PVRCOHJ. E1 CFTASREIB
XS.,RADIO CAPITAL
S,
PARA VCH.,BUS
SHLT.,FACT.IMPRV
CONG DIST. 2 & 8
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
CAPITAL 1997
$ 678
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
610
STATUS: LGPA NOT APPLICABLE
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
68
DOUGHERT CAPT MANT.,MNT.EQP.,COMP.SUPP.,OFF.FURN.,RADIO SYS.,PARAVCHS
4D4013 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
STATUS: PARATRANSIT VCR AND MAINT.TOOLS
CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$ 501
FED SHARE $ 401
GA. SHARE $
50
OTH SHARE $
50
DOUGHERT CAPT.MAINT.,MNT.EQUP&TLS.,COMPUTER SUPP.,OFF.FURN&EUIP.RADIO
4D4014 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH STATUS:
CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$ 456
FED SHARE $ 365
GA. SHARE $
45
OTH SHARE $
46
DOUGHERT PUBLIC TRANSIT SERVICE FOR ALBANY 4D4019 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
STATUS:
CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1997 $ 834
FED SHARE $ 417
GA. SHARE $
OTH SHARE $
417
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY 4D4020 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:
CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
FED SHARE $
GA. SHARE $
OTH SHARE $
1070 416
654
DOUGHERT BUS SHELT.,FAREBXS.,RADIOS,PARATRN VCH.,FACT.IMPRVE 4D4023 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
STATUS:
CONG DIST. 8 & 2
CAPITAL 1998
$ 517
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
414
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
52
OTH SHARE $
52
DOUGHERT CAP.MNT.,MANT.TLS&EQP.,COMP.SUPP.,OFF.EQP.,RADIOS,BUS BNCH., 404024 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: MANAGER: STEVE KISH
STATUS: PARAVCH.,TRANSIT VCH.,FREBXS
CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
CAPITAL 1999
$ 341
FED SHARE $ 273
GA. SHARE $
34
OTH SHARE $
34
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 226
PROJECT LISTING BY ROC FY 1997IFY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
FISCAL
COST
-P--.I-.N--O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L---D-EV--EL-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGHERT TRANSIT VCH.,FREBXS.,RADIOS,PARATRNST.VCH.,BUS SHELTERS,
404025 TRANSIT PROJECTS I CAPITAL
CONG DIST. 2 & 8
FUNDS RECIPIENT:
CAPITAL 1999
$ 357
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $ 286
STATUS: FACIT.IMPROVEMENTS
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
36
OTH SHARE $
36
DOUGHERT TRANSIT SERVICE FOR ALBANY 404026 TRANSIT PROJECTS I OPERATIONS
FUNDS RECIPIENT: ALBANY TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:
CONG DIST. 8 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1999 $ FED SHARE $ GA. SHARE $
OTH SHARE $
1119 316
803
DOUGHERT WIC LIFT FOR TRANSIT AND PARATRANSIT VEHICLES
409001 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ALBANY TRANSIT SYSTEM MANAGER: STEVE KISH
STATUS:
CONG DIST. 8 & 2
CAPITAL 1997
$
31
FUND SOURCE: URBAN TRANSIT
FED SHARE $
28
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
1
OTH SHARE $
2
DOUGHERT WIC LIFT FOR TRANSIT AND PARATRANSIT VEHICLES 4D9002 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: ALBANY TRANSIT SYSTEM
MANAGER: STEVE KISH
STATUS:
CONG DIST. 8 & 2
FUND SOURCE: URBAN TRANSIT
CAPITAL 1998
$
31
FED SHARE $
28
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
1
OTH SHARE $
2
DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
4V7011 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY COUNTY
MANAGER: STEVE KISH
STATUS:
CONG DIST. 8 & 2
CAPITAL 1997
$
80
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
64
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
OTH SHARE $
8
DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 4V7012 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA
MANAGER: STEVE KISH
STATUS:
CONG DIST. 8 & 2
CAPITAL 1998
$
83
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
66
FEDERAL TRANSIT ADMIN FUNDS
GA . .$HARE $
8
OTH SHARE $
8
DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 4V7013 TRANSIT PROJECTS I CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH
STATUS:
CONG DIST. 8 & 2
CAPITAL 1999
$
87
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
70
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
OTH SHARE $
9
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 711196. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
SOUTHWEST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DOUGHERT PHILEMA RD/SR 91 @ JEFFERSON ST/SR 133 IN ALBANY 421425 LANDSCAPING / ENHANCEMENT
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: D. CHURCH STATUS: CO SGN CONTRACT FOR PE, UTILITIES, 50% CONSTRUCTION 11-8-94
ALBANY TIP # H/R-95-10 CONG DIST. 8 s
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
DOUGHERT SR 62 @ COOLEEWAHEE CREEK APP 5 MI W OF JCT SR 91 431455 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .22/.35398 MANAGER: J. SHEFFIELD STATUS: REQ DOUGHERTY COUNTY DO UTILITIES 5-8-95
ALBANY TIP # B-95-3 CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 227
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST 1997
$
62
FED SHARE $
31
GA. SHARE $
OTH SHARE $
31
PE 1998 ROW 1999 CONST
$
10
$
11
AFTER 99
DOUGHERT SR 3/US19 NBL,SBL@ ATLANTIC GULF/GA FLA RR S OF US 82 431620 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .23/.37007 MANAGER: J. SHEFFIELD STATUS: REQ DOUGHERTY AND ALBANY DO UTILITIES 2-23-95
DOUGHERT CR 539/DAWSON RD@ SR 520/US 82/LIBERTY XWAY ... & LEE CO 450400 BRIDGES / NEW CONSTRUCTION
LENGTH(Miles/km): 1.50/2.41350 MANAGER: D. CHURCH STATUS: DOUGHERTY & LEE SGN ROW & UTIL 12/91;ALBANY NO INV UTILITIES
DOUGHERT SR 234/GILLIONVILLE RD FM EIGHT ML RD TO LOCKETT STATION RD 450490 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.17/3.49153 MANAGER: D. CHURCH STATUS:
ALBANY TIP # B-95-2 CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW 1998 $
30
CONST 1998 $ 1176
FED SHARE $
941
GA. SHARE $ 235
OTH SHARE $
ALBANY TIP # H/R-95-7 CONG DIST. 8
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 45040X IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW LOCL
CONST 1997 $ 4397
FED SHARE $ 3518
GA. SHARE $
879
OTH SHARE $
ALBANY TIP # H/R-95-6 CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW LOCL
CONST
$ 173 AFTER 99
DOUGHERT SR 133/BROAD AVE FROM THE FLINT RIVER TO BROADWAY STREET 450530 RECONSTRUCTION & WIDENING FROM 3 LANES TO 4 LANES.
LENGTH(Miles/km): .27/.43443 MANAGER: D. CHURCH
STATUS:
ALBANY TIP # H/R-95-9 CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW LOCL CONST
$
40
AFTER 99
DOUGHERT SR 133/BROAD AVE. @ FLINT RIVER ALBANY - DOWNTOWN 450535 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 3 TO 4 LANES.
LENGTH(Miles/km): .34/.54706 MANAGER: D. CHURCH
STATUS:
ALBANY TIP # B-95-1 CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1998 ROW CONST
$
115
AFTER 99
AFTER 99
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
SOUTHWEST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DOUGHERT CLARK AVE EXT FM SR 62 - SR 133 INT NW TO E OF SWIFT/ALBANY 450540 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1.86/2.99274
MANAGER: D. CHURCH STATUS:
ALBANY TIP # H/R-95-8 CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 228
FISCAL YEAR
COST ESTS
PE 1998 ROW LOCL CONST
$
60
AFTER 99
~OUGHERT DOWNTOWN ENHhl.CEMENT OF ALBANY/THRONATEESKA DEPOT RENOVATION 470910 MISCELLANEOUS IMPROVEMENTS / ENHANCEMENT
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: T. MCQUEEN STATUS: TO BE DONE BY CONTRACT
ALBANY TIP # TSM-2 CONG DIST. 8
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
DOUGHERT D'TOWN ENHANCEMENT OF ALBANY/STREETSCAPE
ALBANY TIP # TSM-2
470914 MISCELLANEOUS IMPROVEMENTS / ENHANCEMENT
CONG DIST. 8
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: T. MCQUEEN
FUND SOURCE: TRANS. ENHANCE.
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
DOUGHERT D'TOWN ENHANCEMENT OF ALBANY/BIKE TRAILS
ALBANY TIP # TSM-2
470916 MISCELLANEOUS IMPROVEMENTS / ENHANCEMENT
CONG DIST. 8
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: T. MCQUEEN
FUND SOURCE: TRANS. ENHANCE.
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
* =FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE LOCL
ROW NONE $
0
CONST 1997
$
270
FED SHARE $ 150
GA. SHARE $
OTH SHARE $
120
PE LOCL
ROW 1997
$
140
CONST 1997
$
998
FED SHARE $ 770
GA. SHARE $
OTH SHARE $ 228
PE LOCL
ROW 1997 $
57
CONST 1997
$
711
FED SHARE $ 558
GA. SHARE $
OTH SHARE $
153
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 230
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-E-G-IO-N-A-L---D-EV--EL-O-P-M-E-N-T---C-O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GRADY SR 111 @ SOFKEE CRK N/CR 81
PE 1992 UNDERWAY
422180 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 2
ROW 1996 UNDERWAY
LENGTH(Miles/km): .75/1.20675
CONST 1997
$
733
MANAGER: J. SHEFFIELD
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
586
STATUS: GRADY SIGNED 2-18-92 FOR UTILITIES (NOT TO EXCEED $1,500.)
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 147
OTH SHARE $
GRADY 431330
STATUS:
SR 111 OVER TURKEY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .75/1.20675 MANAGER: J. SHEFFIELD GRADY COUNTY SIGNED FOR UTILITIES 12-7-93
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$
547
FED SHARE $ 438
GA. SHARE $ 109
OTH SHARE $
GRADY 442550
STATUS:
SR 188 OVER W. BRANCH BARNETTS CK NE OF CAIRO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .75/1.20675 MANAGER: J. SHEFFIELD GRADY SGN FOR UTILITIES 10-18-94
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1997
$
1
CONST 1998 $ 541
FED "SHARE $
433
GA. SHARE $ 108
OTH SHARE $
GRADY 442552
STATUS:
SR 188 OVER BARNETTS CREEK/THOMAS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .75/1.20675
MANAGER: J. SHEFFIELD REQ THOMAS DO UTILITIES 9-21-94; GRADY SGN FOR UTIL 10-18-94
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 44255X IS AN ASSOCIATED PROJECT.
PE 1994 UNDERWAY
ROW 1997 $
1
CONST 1998 $ 549
FED SHARE $ 439
GA. SHARE $
110
OTH SHARE $
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
SOUTHWEST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
EARLY 421640
STATUS:
SR 1/US 27 @ WAMBLE CREEK SOUTH OF BLAKELY REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .50/.80450 MANAGER: M. GANNAWAY EARLY COUNTY SIGNED FOR UTILITIES 5-16-91.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
EARLY 422090
STATUS:
SR 62/BLAKELY FM WEST OF SR 200 TO EAST OF SR 62 BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.69/2.71921
MANAGER: J. SHEFFIELD BLAKELY SGN DO UTIL 12-1-92;EARLY NO INVOLVED UTILITIES.
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 229
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1999 $ 230
FED SHARE $ 184
GA. SHARE $
46
OTH SHARE $
PE 1992 ROW 1999 CONST
UNDERWAY
$
10
AFTER 99
EARLY 431320
STATUS:
SR 1 OVER BLUE CREEK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .75/1.20675 MANAGER: M. GANNAWAY EARLY SGN FOR UTILITIES 8-2-94
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
PE 1994
UNDERWAY
ROW NONE $
0
CONST 1999
$
369
FED SHARE $ 295
GA. SHARE $
74
OTH SHARE $
~---~-;
!!-___ .J
Ut..::: ___)
~--'- :.U
. . . e:::~- _:J
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
P. I. NO.
PROJECT DATA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
LEE
SR 91/PHILEMA RD FM DOUGHERTY CL TO GRAVES SPRING RD/CR 5
* ALBANY TIP H/R-95-3
421870 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 8
LENGTH(Miles/km): 2.81/4.52129
MANAGER: M. GANNAWAY
FUND SOURCE: SURFACE TRANSPORT.
STATUS: LEE COUNTY SIGNED 2/6/90 FOR ROW AND UTILITIES.
FEDERAL HIGHWAY ADMIN FUNDS
20-Sep-1996 Page 231
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW LOCL
CONST 1997
$ 3263
FED SHARE $ 2610
GA. SHARE $ 653
OTH SHARE $
LEE
CR 539/DAWSON RD@ SR 520 ... SEE DOUGHERTY CO- 450400
ALBANY TIP # H/R-13
PE NONE
$
0
45040X UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: D. CHURCH
FUND SOURCE: DEMONSTRATION PROGRAM
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
450400 IS AN ASSOCIATED PROJECT.
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1997/FY 1999
SOUTHWEST GEORGIA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
MITCHELL CR 307 AT BIG SLOUGH AND OVERFLOW IN NORTH CAMILLA 442740 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .40/.64360 MANAGER: J. SHEFFIELD STATUS: CAMILLA SGN FOR ROW,UTIL & DETOURS 12/95; MITCHELL SGN 12/95
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MITCHELL RESTORE MITCHELL DRUG STORE/VISITOR CENTER IN CAMILLA
471020 HISTORIC FACILITIES / ENHANCEMENT LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: MANAGER: STEVE YOST
STATUS: LGPA TO BE DONE BY CONTRACT
CONG DIST. 2 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
20-Sep-1996 Page 232
FISCAL YEAR
COST ESTS
PE 1998 ROW LOCL CONST
$
10
AFTER 99
PE LOCL
ROW LOCL
CONST 1997
$
371
FED SHARE $ 297
GA. SHARE $
OTH SHARE $
74
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 233
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N-------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-ST--S--
TERRELL SR 49 OVER KINCHAFOONEE CREEK/ ALSO SUMTER CO
PE 1992 UNDERWAY
421980 REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES.
CONG DIS.T. 2
ROW 19"97 $
8
LENGTH{Miles/km): 1.50/2.41350
CONST 1998 $ 2212
MANAGER: J. SHEFFIELD
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 1770
STATUS: TERRELL SGN 8-7-91 AND SUMTER SGN 8-8-91 FOR UTILITIES.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
442
42198X IS AN ASSOCIATED PROJECT.
OTH SHARE $
TERRELL 442570
STATUS:
SR 55 REALIGNMENT FM MP 6.6 TO MP 7.0 NORTH OF HEROD RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. LENGTH(Miles/km): .40/.64360 MANAGER: J. SHEFFIELD TERRELL SIGNED TO DO UTILITIES 1-10-94
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. {FY 96). SHOWN FOR CLARITY ONLY.
PE 1996 UNDERWAY
ROW 1996 UNDERWAY
CONST 1997
$
122
FED SHARE $
98
GA. SHARE $
24
OTH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 234
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ----------------PR--O-JE-C-T---D-A-TA----------R-E-G-IO-N-A--L--D-EV--EL-O-P-M--EN-T---C-O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
THOMAS SR 38/US 84 BUS @ ATLANTIC-GULF RAILROAD NW/THOMASVILLE
PE 1992 UNDERWAY
421970 REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES.
CONG DIST. 2
ROW 1998
$
50
LENGTH{Miles/km): 1.00/1.60900 MANAGER: J. SHEFFIELD
FUND SOURCE: BRIDGE PROGRAM
CONST 1999
$ 3146
FED SHARE $ 2517
STATUS: THOMAS SGN PUB UTIL 2-12-92; THOMASVILLE SGN 2-12-92 UTIL.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
629
OTH SHARE $
THOMAS 431090
STATUS:
SR 33 @ PISCOLA CREEK NORTH OF BOSTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH{Miles/km): .50/.80450 MANAGER: J. SHEFFIELD THOMAS COUNTY SIGNED FOR UTILITIES 8-15-91
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1995 UNDERWAY
CONST 1997
$ 1160
FED SHARE $ 928
GA. SHARE $ 232
OTH SHARE $
THOMAS 442500
STATUS:
METCALFE ROAD/CR 384 OVER PINE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .23/.37007 MANAGER: J. SHEFFIELD THOMAS COUNTY SGN 9-1-92 FOR ROW, UTILITIES & DETOURS
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW LOCL
CONST 1998 $ 329
FED SHARE $ 263
GA. SHARE $
66
OTH SHARE $
THOMAS 44255X
SR 188 OVER BARNETTS CREEK SEE GRADY COUNTY--442552
UNKNOWN / UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000- EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: BRIDGE PROGRAM
PE NONE $
0
ROW NONE $
0
CONST NONE $
0
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
442552 IS AN ASSOCIATED PROJECT.
THOMAS 442720
STATUS:
SR 188 @ HORSE CREEK APP 2 MI W OF OCHLOCKNEE REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES.
LENGTH{Miles/km): .20/.32180 MANAGER: J. SHEFFIELD THOMAS SIGNED FOR UTILITIES 5-16-95.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1997
UNDERWAY
ROW 1998 $
10
CONST 1999
$
199
FED SHARE $ 159
GA. SHARE $
40
OTH SHARE $
THOMAS 450460
STATUS:
CS 245/PINE TREE BLVD @ OLIVE CK/THOMASVILLE REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. LENGTH{Miles/km): . 75/1.20675
MANAGER: J. SHEFFIELD CO SGN 10-26-93 & CITY SGN 11-9-93 FOR ROW, UTIL & DETOURS
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW LOCL
CONST 1997
$
136
FED SHARE $ 109
GA. SHARE $
27
OTH SHARE $
*=FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
GEORGIA DEPARTMENT OF TRANSPORTATION
20-Sep-1996
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 235
PROJECT LISTING BY RDC FY 1997/FY 1999
COUNTY
DESCRIPTION
SOUTHWEST GEORGIA
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA----------R-EG--IO-N-A-L--D--EV-E-L-O-P-M-E-N-T--C--O-M-M-I-S-S-IO-N--------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
WORTH
CR 297 @ SWIFT CREEK APPROX. 2 MILES NE OF WARWICK
PE 1996 UNDERWAY
470895 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
CONG DIST. 8
ROW LOCL
LENGTH(Miles/km): .21/.33789
CONST 1998
$
274
MANAGER: J. SHEFFIELD
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 219
STATUS: WORTH SGN 2-7-95 & CRISP SGN 2-14-95 ROW, UTIL & DETOURS
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
55
OTH SHARE $
* = FUNDS EXPECTED TO BE ENCUMBERED PRIOR TO 7/1/96. (FY 96). SHOWN FOR CLARITY ONLY.
r"7
'..;_ ~ )
04M097 04M098 04M099 04MB97 04MB98 04MB99 110231 110233 110250 110330 110400 110445 11044Y 11044Z 110462 110465 110470 110530 11Y231 11Y233 121600 121604 121740 121980 122150 12215X 122160 12216X 122230 122400 122420 122440 122450 122510 122560 122600 122720 122860 122870 12Y080 132040 132100 132160 132220 132360 132440 132470 132510 132540 132550 132560 13256X 132570 132600 132610 132620
Program Item Number Page Index for 1997 STIP by RDC
Page 150 Page 150 Page 150 Page 150 Page 150 Page 151 Page 35 Page 36 Page 197 Page 36 Page 109 Page 197 Page 104 Page 107
Page 107 Page 109 Page 109 Page 36 Page 36 Page 36 Page 197 Page 197 Page 116 Page 106 Page 197 Page 109 Page 193 Page 197 Page 115
Page 197 Page 115 Page 108 Page 108 Page 198 Page 203 Page 193 Page 36 Page 151
Page 190 Page 107 Page 198 Page 108 Page 111 Page 190 Page 36 Page 114 Page 37 Page 106 Page 111 Page 198 Page 116 Page 108 Page 190 Page 108 Page 109 Page 203
132640 132670 132690 141605 141805 141850 141970 141980 141990 142020 142030 142070 150210 150213 150215 15021X 15021Y 150270 170833 170843 170881 170900 170910 170925 171000 171001 171002 171020 171060 171070 171170 171210 171260 171330 171340 171341 171342 171350 171370 171371 171372 171380 17138X 1B9001 1B9002 1B9003 1C9001 1C9002 1C9003 1D1019 1D1020 1D1022 1D1023 1D1061 1D1062
Page 106 Page 190 Page 109
Page 106 Page 37 Page 111 Page 201 Page 201 Page 107 Page 194 Page 201 Page 105 Page 201 Page 193 Page 201 Page 193 Page 193 Page 37 Page 114 Page 111 Page 116 Page 112 Page 112 Page 193 Page 198 Page 198 Page 198 Page 116 Page 109 Page 198 Page 203 Page 37 Page 37 Page 37 Page 37 Page 38 Page 38 Page 38 Page 110 Page 113 Page 115 Page 108 Page 113 Page 142 Page 142 Page 142 Page 142 Page 142 Page 142 Page 191 Page 191 Page 191 Page 191 Page 191 Page 191
1D1063 1D1065 1Dl066 1Dl067 1D7147 1D7148 1D7149 1D7150 1V7007 1V7017 1V7018 1V7022 1V7023 210327 210360 210430 210440 210450 210530 210560 210565 210570 210610 210640 210660 210760 210800 21Y430 21Y440 220105 220107 220680 22118Z 221328 221329 221360 221532 221540 221550 221610 221762 221805 221810 221860 22186X 221935 221975 222040 222080 222140 222180 222190 22219X 222200 222210
page 1
Page 191 Page 192 Page 192 Page 192 Page 35 Page 35 Page 35 Page 35 Page 192 Page 35 Page 192 Page 35 Page 192 Page 54 Page 54 Page 54 Page 54 Page 54 Page 200 Page 199 Page 46 Page 55 Page 128 Page 200 Page 122 Page 55 Page 151 Page 55 Page 55 Page 55 Page 55 Page 55 Page 45 Page 58 Page 58 Page 195 Page 56 Page 122 Page 56 Page 195 Page 183 Page 46 Page 122 Page 46 Page 56 Page 183 Page 119 Page 200 Page 195 Page 46 Page 170 Page 51 Page 60 Page 128 Page 48
222220 222350 222370 222390 222450 222670 22Y390 231140 231145 23114X 231220 231240 231270 231310 231330 231450 231520 231960 231970 231980 232005 240809 242160 242165 242220 242290 242300 24230X 242315 245020 24502X 245100 245110 245120 245130 245140 24Y809 250475 250490 250510 250570 250590 262080 262410 262450 262570 270680 270681 270760 270815 270990 271000 271010 271110 271120 271122
Program Item Number Page Index for 1997 STIP by RDC
Page 183 Page 56 Page 56 Page 59 Page 181 Page 151 Page 59 Page 128 Page 48 Page 128 Page 200 Page 60 Page 181 Page 49 Page 49 Page 170 Page 177 Page 48 Page 48 Page 50 Page 122 Page 56 Page 118 Page 118 Page 52 Page 170 Page 183 Page 178 Page 202 Page 183 Page 182 Page 195 Page 195 Page 195 Page 201 Page 60 Page 56 Page 46 Page 57 Page 57 Page 57 Page 60 Page 46 Page 46 Page 52 Page 122 Page 195 Page 196 Page 181 Page 177 Page 49 Page 122 Page 200 Page 177 Page 57 Page 52
271124 271126 271128 271130 2B9001 2B9002 2B9003 2C9001 2C9002 2C9003 2D2016 2D2017 2D2018 2D2019 2D2020 2D2021 2V7021 2V7022 2V7023 310713 310980 311000 311120 311155
31138X 311400 311445 311460 311540
311560 311617 311630 311665 311740 311770 311780 311790 311840
311910 311970 315097
315098 315099 315U97 315U98 315U99 31YOOO 31Y713 321145 321530 321580 321610 321614 321616 321720
Page 59 Page 60 Page 47 Page 181 Page 142 Page 143
Page 143 Page 143 Page 143 Page 143 Page 53 Page 53 Page 53 Page 53 Page 53 Page 53 Page 53 Page 54 Page 54 Page 171 Page 171 Page 172 Page 39 Page 135 Page 161 Page 172 Page 135 Page 172 Page 180 Page 172 Page 179 Page 135 Page 166 Page 179
Page 135 Page 180 Page 63 Page 39 Page 172 Page 151 Page 151
Page 151 Page 152 Page 152 Page 152
Page 152 Page 172
Page 172 Page 39 Page 39 Page 131 Page 166
Page 166 Page 166 Page 66
321810 321964 322100 322250 322280 322350 322360 322430 322450 32245X 322530 322560 322570 322650 322670 322690 322830 331360 331520 33152X 331550 331610 331620 331740 331850 331860 331940 331970 331980 331990
332030 332050 332160 332170 332180 332280 332300 332310 332510 33A097 33A098 33A099 33C097 33C098 33C099 33CB97 33CB98 33D097 33D098 33D099 33DB97 33DB98 33DB99 33MS97 33MS98
page 2
Page 135 Page 20 Page 162 Page 66 Page 167 Page 20 Page 179 Page 169 Page 180 Page 175 Page 161 Page 175 Page 175 Page 20 Page 20 Page 169 Page 152 Page 39 Page 163 Page 40 Page 40 Page 168 Page 124 Page 63 Page 178 Page 175 Page 180 Page 163 Page 40 Page 40 Page 124 Page 163 Page 136 Page 63 Page 63 Page 168 Page 167 Page 133 Page 160 Page 152 Page 152 Page 153 Page 153 Page 153 Page 153 Page 153 Page 153 Page 153 Page 154 Page 154 Page 154 Page 154 Page 154 Page 154 Page 154
~
r~~
33MS99
~,. 33NS97
~.
L
33NS98
33NS99
342080
342340 ii!__ 342480
342621
342780
342790
342895
342900
342945
342950
342955
342960
343000
343010
350260
350685
350690
350750
350780
350790
350820
350840
350870
350875
350880
350960
350980
350990
351000
351060
351070
351080
351160
351170
363720
370781
370811
370824
370826
371030
371205
371210
37121X
371220
371230
371260
371280
371302
3713 06
3 713 08
37133 0
371420
Program Item Number Page Index for 1997 STIP by RDC
Page 155 Page 155 Page 155 Page 155 Page 173 Page 176 Page 163 Page 163 Page 133 Page 164 Page 168 Page 63 Page 63 Page 63 Page 64 Page 64 Page 124 Page 168 Page 136 Page 136 Page 136 Page 169 Page 136 Page 136 Page 173 Page 176 Page 136 Page 137 Page 137 Page 173 Page 64
Page 66 Page 137 Page 137 Page 176 Page 173 Page 173 Page 66 Page 162 Page 64 Page 179 Page 64 Page 64 Page 173 Page 164 Page 166
Page 167
Page 133 Page 163 Page 140 Page 141 Page 64 Page 65 Page 65 Page 65 Page 173
371440 371442 371444 371450 371452 371454 371456 371480 371481 37Y454 3AA097 3AA098
3AA099 3AAB97 3AAB98 3B9001
3B9002 3B9003 3C9001 3C9002 3C9003 3D3019 3D3020 3D3021 3D3022 3D3023 3D3024 3D3100 3V7004 3V7013 3V7018 3V7019 3V7020
3V7021 3V7022 3V7023 3V7024 3V7025 3V7026 3V7029 3V7030 410245
410250 41025X 410260 410420
410530
41053X 410590 410600 410620 410670 41Y260 421340 421345
Page 40 Page 40 Page 40 Page 174 Page 174 Page 160 Page 133 Page 167 Page 137 Page 160 Page 155 Page 155 Page 155 Page 156 Page 156 Page 143 Page 143 Page 144 Page 144 Page 144 Page 144 Page 134 Page 134 Page 171 Page 171 Page 134 Page 134 Page 171 Page 171 Page 20 Page 39 Page 175
Page 134 Page 171 Page 175 Page 134 Page 20 Page 39 Page 144 Page 175 Page 134 Page 211 Page 211 Page 165 Page 165 Page 206 Page 206 Page 210 Page 211 Page 206 Page 206 Page 156 Page 165 Page 217 Page 217
421425 421640 421720 421722 42172X 42172Y 421870 421970 421980 42198X 422055 422090 422170
422180 422280 422310 422320
422350 422510 422520 422580 431090 431180 431290 431300 431320 431330 431455 431520 431540
431570 431580 431590
431600 431610 431620 431650 431680 431690 431695 431700
431710 442500 442550 442552
44255X 442565
442570 442580 442600 442680 442682 442710 442715 442720
page 3
Page 227 Page 229 Page 205 Page 205 Page 208 Page 208 Page 231 Page 234 Page 233 Page 169 Page 216 Page 229 Page 210 Page 230 Page 208 Page 130 Page 210 Page 217 Page 205 Page 224 Page 156 Page 234 Page 204 Page 138 Page 211 Page 229 Page 230 Page 227 Page 138 Page 223 Page 211 Page 211 Page 211 Page 212 Page 217 Page 227 Page 222 Page 208 Page 130 Page 130 Page 210 Page 221 Page 234 Page 230 Page 230 Page 234 Page 208 Page 233 Page 204 Page 217 Page 205 Page 205 Page 132 Page 216 Page 234
442725 442740 442750 442760 442780 442790 450380 450400 45040X 450420 450430 450450 450460 450490 450530 450535 450540 470895 470910 470914 470916 471020 471030 471060 471080 471220 471221 4B9000 4B9001 4B9002 4C9000 4C9001 4C9002 4D1015 4D4013 4D4014 4D4019 4D4020 4D4023 4D4024 4D4025 4D4026 4D9001 4D9002 4V7011 4V7012 4V7013 511060 511080 511086 511087 51115X 511190 51119X 511245 511325
Program Item Number Page Index for 1997 STIP by RDC
Page 138 Page 232 Page 223 Page 207 Page 208 Page 202' Page 21':' Page 22~' Page 232_ Page 204 Page 209 Page 209 Page 234 Page 227 Page 227
Page 227 Page 228 Page 235 Page 228 Page 228 Page 228 Page 232 Page 223 Page 139 Page 217 Page 218 Page 210 Page 144 Page 144 Page 145 Page 145 Page 145 Page 145
Page 225 Page 225 Page 225 Page 225 Page 225
Page 225 Page 225 Page 226
Page 226 Page 226 Page 226
Page 226 Page 226 Page 226 Page 73 Page 70 Page 70 Page 70 Page 67 Page 67 Page 79 Page 81 Page 67
51132X 51132Z 511330 51Y060 51Y080 51Y086 520781 520890 520910 521270 521275 521495 521505 521508 521530 521770 521780 521800 521855 521860 521865 521867 521910 521970 522000 522005 522042 522060 522170 52217X 522240 522310 522320 522470 522490 522610 522620 522640 522660 522670 522690 522730 522800 522900 52Y770 531250 531260 531300 532390 532400 532470 532510 532560 532570 532630
Page 74 Page 79 Page 156 Page 74 Page 70 Page 70 Page 83 Page 81 Page 213 Page 68 Page 68 Page 74 Page 74 Page 74
Page 220 Page 74 Page 74 Page 68 Page 75 Page 75 Page 75 Page 75 Page 70 Page 68 Page 125 Page 120 Page 81 Page 220 Page 79 Page 75 Page 85 Page 81 Page 127 Page 68 Page 75 Page 75 Page 125 Page 68 Page 121 Page 76 Page 70
Page 81 Page 76 Page 117 Page 76 Page 129 Page 76 Page 215 Page 79 Page 127 Page 219 Page 76
Page 126 Page 76 Page 68
53263X 532750 532760 532770 532780 541950 541960 54196X 542040 542045 542050 550500 550570 550580 550590 550610 55061X 562110 562120 570810 570860 570925 570970 571030 571040 571060 571180 571210 571211 571212 571213 5B9000 5B9001 5B9002 5C9000 5C9001 5C9002 5D5017 5D5018 5D5019 5D5020 5D5022 5D5023 5D5024 5D5025 5D5026 5D5027 5D8001 5D8002 5D8003 5D8004 5D8006 5V7005 5V7016 5V7017
page 4
Page 58 Page 76 Page 77 Page 77 Page 77 Page 69 Page 125 Page 84 Page 69 Page 126 Page 126 Page 69 Page 77 Page 77 Page 77 Page 123 Page 127 Page 81 Page 82 Page 71 Page 77 Page 214 Page 220 Page 83 Page 71 Page 78 Page 125 Page 83 Page 78 Page 78 Page 85 Page 145 Page 145 Page 145 Page 146 Page 146 Page 146 Page 72 Page 72 Page 72 Page 72 Page 72 Page 72 Page 72 Page 73 Page 73 Page 73 Page 80 Page 80 Page 80 Page 80 Page 80 Page 73 Page 80 Page 73
;;.-
"/
'I
L';
5V7018 5V7019 5V7020 610550 610690 610730 l. 610740 610750 610755 610760 610870 610890 610900 610910 61091X 610925 610930 610990 611006 611020 611145 611160 61Y930 620399 620490 620590 620645 620647 620832 620834 620920 620940 620960 620975 621193 621194 62119X 621230 621255 621265 621390 621420 621440 621470 621475 621510 621530 621540 621545 621550 621560 621570 621640 621660 621670 62168X
Program Item Number Page Index for 1997 STIP by RDC
Page 80 Page 73 Page 81 Page 95 Page 188 Page 87 Page 1 Page 95 Page 95 Page 188 Page 95 Page 188 Page 188 Page 98 Page 61 Page 95 Page 95 Page 90 Page 95 Page 90 Page 1 Page 156 Page 96 Page 186 Page 184 Page 92 Page 101 Page 101 Page 86 Page 99 Page 1 Page 1 Page 188
Page 188 Page 103 Page 103 Page 87 Page 90 Page 86 Page 186 Page 1 Page 101 Page 86 Page 101 Page 101
Page 96 Page 87 Page 96 Page 96 Page 92 Page 92
Page 99 Page 187
Page 93 Page 93 Page 86
621830 621890 621910 621920 621950 621970 621980 622000 62R645 62R64 7 62Y230 62Y530 62Y834
630673 630915
630975 631100 631110 631140 631170 631250 631280 631290 631320
631402 631420 631430 631505 631510 631520 631525 631570
631580 631600 631630 632640 632650 632660 632680 632690 63Y673 641810 641880
641890 641950
641980 642030 642080 642085 642090 650410 650430 650440
650460 650480
Page 187 Page 93 Page 184 Page 93 Page 184 Page 61
Page 156
Page 93 Page 101 Page 101 Page 90 Page 87
Page 99 Page 2
Page 90 Page 2
Page 185 Page 185 Page 98 Page 98 Page 188 Page 102 Page 96 Page 61 Page 86 Page 87
Page 185 Page 87 Page 86 Page 87 Page 99 Page 96 Page 185 Page 88 Page 99 Page 2 Page 2
Page 99 Page 187 Page 96 Page 2
Page 103 Page 102
Page 61
Page 98 Page 99
Page 100 Page 61 Page 61
Page 61 Page 93 Page 88 Page 88 Page 93 Page 62
650570 650580 650600 65Y440 662500 662510 670710 670750 670780 670820 670900 670920
670930 670940
670942
670944 670950 671020 671040 671055 67105X 671070 671072 671074 6B9000 6B9001 6B9002 6C9000 6C9001 6C9002 6D6016 6D6017
6D6019 6D6021 6D6022 6D6023 6D6024 6D6025 6V7006 6V7014 6V7015
6V7016 6V7018
712360 712602 712630 712752
712806 712870
712930 712940 712950 713040 713050 713070
page 5
Page 62 Page 103 Page 94 Page 88 Page 62 Page 97 Page 88 Page 89 Page 186 Page 94 Page 102 Page 100 Page 184 Page 97 Page 97 Page 97 Page 2 Page 62 Page 62 Page 186 Page 189 Page 94 Page 102 Page 185 Page 146 Page 146 Page 146 Page 146 Page 147 Page 147 Page 91 Page 91 Page 91 Page 91 Page 91 Page 91 Page 91 Page 92 Page 1 Page 92 Page 92 Page 1 Page 92 Page 23 Page 3 Page 3 Page 6 Page 7 Page 13 Page 18 Page 24 Page 24 Page 13 Page 3 Page 3
713157 71315X 713210 713220 713240 713280 713310 713320 713330 713380 713400 71340X 713490 713650 713680
713750 71Y220 71Y320 71Y640 71Y940 71Y950 720570 721010 721040
72104X 721050 721150 721310 721320 721330 721420 721440 72144X 721460 721480 72148X 721535 72153X
721580 721680 721685 721810 721850 721930 72Y460 730756 730903 730905 730950 730970 731047 731048 731430 731520 731580 742482
Program Item Number Page Index for 1997 STIP by RDC
Page 24 Page 13 Page 4 Page 14 Page 7 Page 14 Page 24 Page 14 Page 24 Page 7 Page 24 Page 14 Page 19 Page 157 Page 14 Page 7
Page 14 Page 14 Page 42 Page 24 Page 25 Page 25 Page 25 Page 4 Page 20 Page 15 Page 7 Page 7 Page 19 Page 15 Page 19 Page 21 Page 4
Page 25 Page 4 Page 41 Page 15 Page 38 Page 42 Page 7 Page 8 Page 25 Page 25 Page 25 Page 26 Page 26 Page 42 Page 42 Page 42
Page 15 Page 43 Page 43 Page 26 Page 4 Page 26 Page 26
742820 742860 74286X 742880 750780 751370 751495 751560 751770 751775 751820 751825 751900 752020
752030 752040 752070 752075 752100 752190 752220 752230 752265
752300 752310 752320 752330 752390 752400 752420 752520 752540 752545 752550 752560 752570 752580 752590 752600 752620
752630 752650 752710 752770
762370 770265 770269 770274 770310
770350 770360
770388 770391 770398 770410
Page 43 Page 26 Page 38 Page 43 Page 26 Page 15
Page 15 Page 27 Page 4 Page 4 Page 19 Page 19
Page 27
Page 27
Page 27
Page 27
Page 27 Page 27 Page 15 Page 43 Page 8 Page 28 Page 8 Page 8 Page 8 Page 28 Page 43
Page 43 Page 44
Page 44
Page 28 Page 28 Page 28 Page 28 Page 28 Page 29 Page 29 Page 5 Page 5 Page 29
Page 8 Page 29
Page 29 Page 16
Page 29 Page 8 Page 9 Page 29 Page 30 Page 9 Page 9 Page 30 Page 157 Page 30 Page 30
770418 770420 770460 770585 770597 770605 770639 770690 770694 770730 770840 770860 770870
770873 770893
770900 770910 770911 770912 770913 770920 770921 770922 770923 770926 770927
770930 770931 770932 770933 770934 770935 770937 770951 770952 770960 770962
770963 770964 770965
770966 770967 770971 770972 770973
770975 770976 770977 770980 770985 770986
770988 770990 770992 770994
page 6
Page 9 Page 30 Page 5 Page 9 Page 30 Page 30 Page 31 Page 31 Page 9 Page 9 Page 16 Page 16 Page 31 Page 31 Page 10 Page 31 Page 16 Page 16 Page 16 Page 16 Page 10 Page 10 Page 10 Page 31 Page 31 Page 32 Page 10 Page 10 Page 32 Page 32 Page 44 Page 44 Page 44 Page 32 Page 32 Page 10 Page 11 Page 11 Page 11 Page 32 Page 11 Page 32 Page 33 Page 5 Page 11 Page 19 Page 19 Page 33 Page 33 Page 33 Page 33 Page 33 Page 17 Page 17 Page 44
~- ',
771010 771011 771012 771020 771021 771022 771030 771036 771037 771040 77Y990 7C9000 7C9001 7C9002 7D7507 7D7508 7D7509 7D7510 7D7511 7D7513 7D7514 7D7516 7D751X 7D7521 7D7522 7D7523 7D7525 7D7526 7D7528 7D7529 7D752X 7D7530 7D7532 7D7533 7D7543 7D7544 7D754Z 7V7008 7V7009 7V7010 7V7012 7V7015 7V7022 7V7023 7V7024
Program Item Number Page Index for 1997 STIP by RDC
Page 33 Page 34 Page 34 Page 11 Page 34 Page 11 Page 34 Page 34 Page 17 Page 12 Page 17 Page 147 Page 147 Page 147 Page 22 Page 22 Page 22 Page 22 Page 22 Page 6 Page 6 Page 18 Page 13 Page 22 Page 22 Page 23 Page 23 Page 23 Page 18 Page 18 Page 13 Page 18 Page 6 Page 6 Page 3 Page 23 Page 192 Page 3 Page 6 Page 13 Page 18 Page 23 Page 42 Page 3 Page 6
7V7025 7V7026 7V7027 7V7028 811020 811060 811061 811062 821050 870021 870022 870023
870150 870155 870160
870165 870170 8B9001 8B9002 8B9003 8C9000 8C9001 8C9002
8C9003 8C9100 8C9101 8D0001 8D0002 8V7001 8V7002
8V7003 8V7004 8V7005
8V7006 8V7007 8V7008 8V7009 NPSE97 NPSE98 NPSE99 NPSS97
NPSS98 NPSS99
Page 13 Page 18 Page 23 Page 42
Page 157 Page 157 Page 157 Page 157 Page 157 Page 158 Page 158 Page 158 Page 158 Page 158 Page 158 Page 158 Page 159 Page 147 Page 147 Page 148 Page 148 Page 148 Page 148 Page 148 Page 148 Page 148 Page 135 Page 135 Page 149 Page 149 Page 149 Page 149
Page 149 Page 149 Page 149 Page 150 Page 150 Page 159 Page 159 Page 159 Page 159 Page 159 Page 159
page 7