STATEWIDE"
'
I
' 1: TRANSPORTATION
IMPROVEMENT PROGRAM
GEORGIA DEPARTMENT OF TRANSPORTATION
Fiscal Years
1996 1997 1998
Pi
.
,,
" !
INDEX
INTRODUCTION
REGIONAL DEVELOPMENT CENTERS JALTAMAHA GEORGIA RDC
ATLANTA REGIONAL COMMISSION
CENTRAL SAVANNAH RDC
CHATTAHOOCHEE FLINT RIVER RDC
JcoASTAL GEORGIA RDC
}COOSA VALLEY RDC
/GEORGIA MOUNTAINS RDC
.HEART OF GEORGIA RDC
tt ..
h
i LOWER CHATTAHOOCHEE RDC
il
LUMP SUM AREA
MCINTOSH TRAIL RDC
./MIDDLE FLINT RDC MIDDLE GEORGIA RDC
NORTH GEORGIA RDC
I '
NORTHEAST GEORGIA RDC
E
jsoUTH GEORGIA RDC
./SOUTHEAST GEORGIA RDC
I
SOUTHWEST GEORGIA RDC
I
APPENDIX ABBREVIATIONS
I .
E .
I
E
PAGE
1
7
78 104 114 134 165 187 199 211 223 232 241 264 276 292 306 315
)
f
r
INTRODUCTION The Statewide Transportation Improvement Program
(STIP) contains Federal Aid projects programmed for
Fiscal Years 1996, 1997 and 1998. The projects have
been identified through the planning process as
important to the state's transportation program.
The STIP includes Highway and Bridge, Bicycle,
Pedestrian, Transportation Enhancement, and Public
Transportation (transit) projects. Project related
activities, such as PE (Preliminary Engineering), ROW
(Right of Way) and CONST (Construction) are given for
highways, and CAPITAL and OPERATING for public
I
transit. The projects are organized in alphabetical order by Regional Development Center, County and mode of transportation. The STIP format has been standar-
dized with the same information for each project.
The STIP is fiscally balanced, includ_ing only those
projects with funding available or a reasonable
expectation of obtaining funds. Federal funds for
Fiscal Years 1996, 1997 and 1998 are program estimates
and will not be final until after the federal budget
is approved on October 1 of each year..
Projects in the Statewide Transportation Improvement
Program emphasize maintenance, safety and improving
I
9perations of the existing highways, bridges, and public transportation. The Georgia Department of
Transportation is pleased to make this document
available. We welcome comments on the STIP. Please
send any questions or comments to:
Georgia Department of Transportation Office of Planning No. 2 Capitol Square Atlanta, Georgia 30334
Att: Marta V. Rosen (404) 656-5725
E.
I. I I
f!!ll!!!I
. 1!!!!!!1!!111 .l!!l!.ffl!!
!!!f!ll!.I.I
~
~
~
~
~
~
. ffl,~.:I~ efi
~
ffea%;~
~
li.-.:<.::6:'ii
. Y.~'v. ,,,,~;.,!;ii
;~d,'-c>:f
STIP : DISTRIBUTION BY MODE
FY 1996-97-98
TRANSIT 21.9%
MAINT.
ENHANCEMENT 1.5%
BRIDGE 6.4%
RECST/REHAB 42.6%
Total STIP Program: $2,753.3 Millions
. 13.6% 3.6%
~:-:
{~ :,_
~
.;.
;.,f
.J
qr
1" l
!i
,ii.
"'
I lt
I
Altamaha Georgia Southern
I
Regional Development Center
.
I
Appling Bulloch
I "
Candler Evans
Jeff Davis
I
Tattnall Toombs
I
Wayne
I
I
I
I.
I .
I
I
I!!!!!!!! ~
COUNTY P.I.NO.
!!!!!!!!I!!!
!!!!!!!I!!
DESCRIPTION PROJECT DATA
~
~
~
~
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ALTAMAHA GEORGIA SOUTHERN
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
BULLOCH 521270
STATUS:
SR 67 FM CR 248/585 NORTH TO 5-LN SECTION RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 1.40/2.25260 MANAGER: TONY COLLINS STATESBORO SGN 6-4-91 & COUNTY SGN 6-5-91 FOR UTILITIES
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 1
FISCAL YEAR
COST ESTS
PE 1992 ROW 1998 CONST
UNDERWAY
$
150
AFTER 98
BULLOCH 521275
STATUS:
SR 67@ LITTLE LOTTS CRK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS BULLOCH COUNTY SIGNED 6/14/90 FOR UTILITIES.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 98
BULLOCH 521800
STATUS:
SR 73/US 301 FM PACKING HOUSE RD TO NORTH OF CR 445 & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.45/7.16005
MANAGER: RAY METTS
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1998 CONST
UNDERWAY $ 2822 AFTER 98
BULLOCH 521970
STATUS:
SR 26/STATESBORO FM BRANNEN RD/CR 482 TO SR 67/73/US 301 RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. LENGTH(Miles/km): 1.87/3.00883 MANAGER: RAY METTS CO SGN PUB UTIL 12-17-91;STATESBORO DO UTILITIES 12-2-91
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1998 CONST
UNDERWAY $ . 100 AFTER 98
BULLOCH 522465
STATUS:
SR 67@ WOODCOCK BRANCH & ZETTEROWER BRANCH REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .12/.19308 MANAGER: TONY COLLINS
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 98
BULLOCH .522470
STATUS:
SR 26/US 80 EB MP 7.1-8.2; WB MP 8.1-9.3
ADDITION OF A PASSING LANE. LENGTH (Miles/km.) : 2. 30/3. 70070
MANAGER: TONY COLLINS BULLOCH SGN/UTILITIES 12-17-91;PORTAL SGN 12-5-91 PUB UTILS
BULLOCH 541950
STATUS:
SR 46 OVER LUKE SWAMP BRANCH REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS REQ BULLOCH COUNTY DO UTILITIES 7-25-94; NO UTIL COST 9-94
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1996
$
93
CONST 1997
$
453
FED SHARE $
362
GA. SHARE $
91
0TH SHARE $
PE 1994 UNDERWAY
ROW 1996
$
1
CONST 1997
$
331
FED SHARE $
265
GA. SHARE $
66
0TH SHARE $
COUNTY P .I.NO.
DESCRIPTION .PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY ROC FY 1996/FY 1998
ALTAMAHA GEORGIA SOUTHERN
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
BULLOCH
542040
STATUS:
SR 46@ MANN BRANCH 9 MIS OF BROOKLET REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS REQ BULLOCH COUNTY DO UTILITIES 5-8-95
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 2
FISCAL YEAR
COST ESTS
PE 1997 ROW 1998 CONST
$
10
$
10
AFTER 98
BULLOCH 550500
STATUS:
BRANNEN ST/CS 802 FM GENTILLY RD/CS 673 TOSR 26 -STATESBORO RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): .55/.88495 MANAGER: TONY COLLINS STATESBORO SGN 4-1-91 ROW AND UTILITITES
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL CONST 1996 $ 740
FED SHARE$ 592 GA. SHARE$ 148 0TH SHARE$
l!!!!!!!!9 !!!!!!!!!!!!!!I ~ ~
~
l!!IJ!!!J
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ALTAMAHA GEORGIA SOUTHERN
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
EVANS 522005
STATUS:
SR 73/US 301 FM TATTNALL CO LINE TO S CL/CLAXTON RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 6.75/10.86075 MANAGER: TONY COLLINS REQ TATTNALL P UTL 9/9l;SG~ EVANS 10/91 UTL/CLAXTON 7/93 P.U
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 3
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1996
$
200
CONST 1997
$ 6050
FED SHARE $ 4840
GA. SHARE $ 1210
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ALTAMAHA GEORGIA SOUTHERN
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
JEFF DAV SR 19 FM MCCLOUD RD/CR 321 TO NORTH OF MCCLOUD CIR/CR 146
,
522660 TURN LANES/ SAFETY
CONG DIST. 8
LENGTH(Miles/km): .60/.96540 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: TONY COLLINS
FUND SOURCE: NAT'L HIGHWAY
STATUS: JEFF DAVIS SIGNED FOR UTILITIES 3-11-93.
FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 4
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1996 $ 126 CONST 1996 $ 398
FED SHARE $ 398 GA. SHARE $ 0TH SHARE $
1!!1!1!!!!11!!
l!!!!l!!!!!!I!!
-
~ ~
~ ,:~:~A
GEORGIA DEPARTMENT OF TRANSPORTATION
21-Sep-1995
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 5
PROJECT LISTING BY RDC FY 1996/FY 1998
COUNTY
DESCRIPTION
ALTAMAHA GEORGIA SOUTHERN
FISCAL
COST
P.I.NO.
--------
--------------P-R-O-J-E-C-T--D-A-T-A---------R-E-G-I-O-N-A-L--D-E-V-E-L-O-P-M-E-N-T--C-O-M--M-I-S-SI-O-N-------C-O-M-M--EN-T-S----------------------------Y-EA-R---------E-S-T-S--
TATTNALL SR 73/US 301 FM N CL/GLENNVILLE TO EVANS CO LINE
PE 1992
UNDERWAY
522000 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 1
ROW 1996
$
386
LENGTH(Miles/km): 7.16/11.52044
,
CONST 1997
$ 6792
MANAGER: TONY COLLINS
FUND SOURCE: NAT'L HIGHWAY
FED SHARE $ 5434
STATUS: SIGNED TATTNALL 6/95 & EVANS 10/91 UTIL; CITY 10-8-91 P.UTIL
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1358
0TH SHARE $
TATTNALL SR 30/US 280: OVER THOMAS CREEK NE OF REIDSVILLE 522620 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS STATUS:
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 UNDERWAY
ROW 1997
$
2
CONST 1998
$
420
FED SHARE $
336
GA. SHARE $
84
0TH SHARE $
TATTNALL SR 196 OVER BEARD'S CREEK & LONG COUNTY 541960 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: TONY COLLINS STATUS: REQ LONG DO UTILITIES 9-21-94; TATTNALL SGN 6-26-95 UTIL.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 54196X IS AN ASSOCIATED PROJECT.
PE 1994
UNDERWAY
ROW 1996
$
6
CONST 1998
$
759
FED SHARE $
607
GA. SHARE $
152
0TH SHARE $
- - -- - - - - - - - - - - - - - - - - - - - - - - - ,
COUNTY P, I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTA'i'lON IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ALTAMAHA GEORGIA SOUTHERN
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
TOOMBS 522185
STATUS:
SR 4/US 1@ ROCKY CRK & LITTLE ROCKY CRKS S/LYONS REHAB. OF THE EXISTING BRIDGE($), FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): ,40/,64360 MANAGER: J, GRAYBEAL TOOMBS COUNTY SIGNED 6-27-91 FOR UTILITIES.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 6
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1998
$ 1058
FED SHARE $
846
GA. SHARE $
212
0TH SHARE $
TOOMBS 522225
STATUS:
SR 4/US 1@ COBB CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.00/3.21800 MANAGER: J, GRAYBEAL THOMAS COUNTY SIGNED TO DO UTILITIES 3-11-92
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1998
$
275
FED SHARE $
220
GA. SHARE $
55
0TH SHARE $
TOOMBS 522270
STATUS:
SR 130@ SWIFT CREEK 1 MI NE OF VIDALIA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .50/,80450 MANAGER: TONY COLLINS TOOMBS COUNTY SIGNED 6-27-91 FOR UTILITIES.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1995 UNDERWAY
CONST 1996
$
898
FED SHARE $
718
GA. SHARE $
180
0TH SHARE $
TOOMBS 522320
STATUS:
SR-30 FM MORNINGSIDE TO BROAD FOOT/NOBLE ST (& 1-WAY PAIR) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
~ENGTH(Miles/km): 2.15/3.45935 MANAGER: J. GRAYBEAL REQ TOOMBS DO PUB UTILILIES 11/93;VIDALIA SGN UTIL 11-15-93
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1997 CONST
UNDERWAY
$
394
AFTER 98
TOOMBS 532400
STATUS:
CR 364/0LD RIVER RD OVER WILLIAMS CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. LENGTH(Miles/km): .25/.40225
MANAGER: UNKNOWN TOOMBS SGN DO ROW, UTILITIES AND DETOURS 6-29-92
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
UNDERWAY AFTER 98
TOOMBS SR 292 IMPROVE FM WILSON TO LOWERY & TURN LNS; SEE MONTGOMER
PE NONE
$
0
55061X UNKNOWN/ UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: UNKNOWN
FUND SOURCE: HWY. SAFETY
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
550610 IS AN ASSOCIATED PROJECT .
..
.. - - - - -
I \
.
. I'
.
Atlanta Regional Commission
Cherokee
Clayton
Cobb
Dekalb
-Douglas
1
Fayette
Fulton
1
Gwinnett Henry
I
Rockdale
I
I
I
!!!!!!!!!I
llJ!lll!!I 1!!!!!!!11
~ f!!!!'J!!.!!I
~ ~
~
COUNTY P.I.NO.
.DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1340 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH STATUS:
ATLANTA.TIP lt CONG DIST. 9 & 6
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
lt.l:'.''J$J 1:_:::,-:cli
21-Sep-1995 Page 7
FISCAL YEAR
COST ESTS
OPERATING 1996
$
98
FED SHARE $
57
GA. SHARE $
0TH SHARE $
41
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B7079 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
STATUS:
ATLANTA TIP lt CONG DIST. 9 & 6
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1997
$
102
FED SHARE $
59
GA. SHARE $
0TH SHARE $
43
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B7093 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE
MANAGER: STEVE KISH
STATUS:
ATLANTA TIP lt CONG DIST. 9 & 6
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
103
FED SHARE $
60
GA. SHARE $
0TH SHARE $
43
CHEROKEE ONE CONVERSION VAN 6C2340 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH STATUS:
ATLANTA TIP it
CONG DIST. 9 & 6
CAPITAL 1996
$
31
FUND SOURCE: RURAL TRANSIT
FED SHARE $
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
CHEROKEE ONE CONVERSION VAN WITH A LIFT 6C8045 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH STATUS:
ATLANTA TIP it
CONG DIST. 9 & 6
CAPITAL 1997
$
35
FUND SOURCE: RURAL TRANSIT
FED SHARE $
28
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
7
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY MANAGER: STEVE KISH STATUS:
ATLANTA TIP it
CONG DIST. 9 & 6
CAPITAL 1996
$
30
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6V7006 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY MANAGER: STEVE KISH STATUS:
ATLANTA TIP it
CONG DIST. 9 & 6
CAPITAL 1997
$
30
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
21-Sep-1995 Page 8
FISCAL YEAR.
COST ESTS
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6V7016 TRANSIT PROJECTS/ CAPITAL
FUNDS -RECIPIENT: AGENCIES IN CHEROKEE COUNTY MANAGER: STEVE KISH STATUS:
ATLANTA TIP#
CONG DIST. 6 & 9
CAPITAL 1998
$
30
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
CHEROKEE I-75@ SR 92
ATLANTA TIP# CH-R ioe
610740 INTERCHANGE/ RECST. OR REHAB.
CONG DIST. 6
LENGTH(Miles/km): .45/.72405 - EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: RAY METTS
FUND SOURCE: NAT'L HIGHWAY
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1997 $ 2580 CONST 1998 $ 2892
FED SHARE $ 2314 GA. SHARE $ 578 0TH SHARE $
CHEROKEE I-575@ SR 92 & CR 416 & GUARDRAIL POSTS;
611145 TURN LANES/ SAFETY LENGTH(Miles/km): 12.58/20.24122 - EXI~T. MANAGER: GREG PARKER
STATUS: COUNTY SGN FOR ROW & UTILITIES 1-31-95
I-75@ LANES:
SR 92
ATLANTA TIP# *DU97TIP
CONG DIST. _6
0 /PROPOSED LANES: 0
FUND SOURCE: HWY. SAFETY
OTO
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 $ ROW LOCL CONST 1997 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
30
1499 1348
150
CHEROKEE SR 92 FM WOODSTOCK RD TO CHEROKEE TRAIL 620920 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 4:75/7 .. 64275
MANAGER: RAY METTS STATUS: CHEROKEE COUNTY SGN FOR UTILITIES 11-4-91;
ATLANTA TIP# CH 003 CONG DIST. 6
FUNDSOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW 1998 CONST
UNDERWAY $ 6381 AFTER 98
CHEROKEE SR 92 FM I-75 TO WOODSTOCK RD 620940 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.59/5.77631
MANAGER: RAY METTS STATUS: CHEROKEE COUNTY SIGNED FOR UTILITIES 11-4-91.
ATLANTA TIP# CH 004 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW 1998 CONST
UNDERWAY $ 3327 AFTER 98
CHEROKEE SR 140 REL FM CR 311 NW TO CR 375;THEN NEW LOC TO CR 765 621240 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.30/5.30970 MANAGER: RAY METTS STATUS: CHEROKEE COUNTY SIGNED 1/3/90 FOR UTILITIES.
ATLANTA TIP# CH 005 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
CHEROKEE SR 92 FM CHEROKEETRAIL TO CANTON HWY/SR 754 621390 RECONSTRUCTION-& WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): 1.80/2.89620 MANAGER: KEVIN HOSEY STATUS: CO SGN 1/90 PUB UTL/WOODSTOCK SGN 12/90 UTIL. _SEE #620920.
ATLANTA TIP# CH 009 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1996 $ 6694
CONST 1998 $ 7481
FED SHARE $ 5985
GA. SHARE $ 1496
0TH SHARE $
~ ~ !!!!I!!!!!.!!'!
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CHEROKEE CANTON HWY FM PALM RD/CR 351 TON/SIXES RD [INCL RR BR) 630673 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
LENGTH(Miles/km): .28/.45052 MANAGER: GREG PARKER STATUS: CHEROKEE COUNTY SIGNED 9-23-91 FOR ROW AND UTILITIES.
ATLANTA TIP# CH 002 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 63Y673 IS AN ASSOCIATED PROJECT.
CHEROKEE SR 140 FM SR 5 BUS TO LOWER BURRIS RD NORTH OF CANTON 630942 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.22/5.18098 MANAGER: M. REYNOLDS STATUS: CHEROKEE SGN 3-4-92 UTIL; REQ CANTON DO UTIL 3-2-92
ATLANTA TIP# CH 007 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 9
FISCAL YEAR
COST ESTS
PE 1994
UNDERWAY
ROW LOCL
CONST 1996
$
444
FED SHARE$
355
GA, SHARE$
89
0TH SHARE$
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
CHEROKEE CR 770/BELLS FERRY FM 700 FT S. OF LITTLE RIVER BRON . . 2 MI 630975 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .21/.33789 MANAGER: B. FERGUSON STATUS: REQ CO DO ROW & UTIL 5-7-91 (INCLUDED IN #630977)
CHEROKEE CR 770/BELLS FERRY RD FM CR 1012 TON OF N/VICTORIA RD 630977 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.90/4.66610 MANAGER: B. FERGUSON STATUS: CHEROKEE COUNTY SIGNED 9-23-91 FOR ROW AND UTILITIES.
ATLANTA TIP# CH 018 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP# CH 010 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1996
$
913
FED SHARE$ 730
GA. SHARE$
183
0TH SHARE$
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 98
CHEROKEE CR 1061/CANTON HWY FM END OF MULTI-LN N/I-575 TO SR 20 631130 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
LENGTH(Miles/km): 1.77/2.84793 MANAGER: M. GANNAWAY
STATUS:
ATLANTA TIP# CH 006 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 98
CHEROKEE CR 772/KELLOG CREEK RD@ KELLOG CREEK/LAKE ALLATOONA
631215 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .15/.24135
.
MANAGER: GREG PARKER
-STATUS: CHEROKEE SGN 5-26-93 ROW, UTILITIES & DETOURS; WOODSTOCK N/A
ATLANTA TIP# CH 019 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CHEROKEE SR 140 AT LITTLE RIVER CHEROKEE-FULTON COUNTY LINE 631500 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
LENGTH(Miles/km): .24/.38616 MANAGER: GREG PARKER STATUS: REQ FULTON DO UTIL 8-26-94; CHEROKEE SGN 9-7-94 FOR UTIL
ATLANTA TIP# CH 030 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1996
$
590
FED SHARE $
472
GA. SHARE $
118
0TH SHARE $
PE 1996 $
8
ROW NONE
$
0
CONST 1998
$
350
FED SHARE $
280
GA. SHARE $
70
0TH SHARE $
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANsr,:' n,'rION IMPROVEMENTS PROGRAM
PROJECT Ll' . ,:-:: : BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CHEROKEE SHOWN FOR'STP FUNDS ONLY ..... SEEP.I. 63Y673 BRIDGES/ REPLACEMENT
LENGTH(Miles/km): .00/.00000 MANAGER: GREG PARKER STATUS: SEE.630673
630673
ATLANTA TIP# CH 002 CONG DIST. 9
FUND_ SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630673 IS AN ASSOCIATED PROJECT.
CHEROKEE HISTORIC TRAIN DEPOT RESTORATION IN HOLLY SPRINGS 670840 HISTORIC FACILITIES/ ENHANCEMENT
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED MANAGER: STEVE' YOST STATUS: TO BE DONE.BY CONTRACT
LANES:
ATLANTA TIP# CH 022 CONG DIST. 9
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
CHEROKEE CR 362/MILL'CREEK ROAD@ MILL CREEK 2 MI NE OF WOODSTOCK 670950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH(Miles/km): .20/.32180 MANAGER: GREG PARKER STATUS: REQ CHEROKEE COUNTY DO ROW, UTILITIES & DETOURS 9-27~94
ATLANTA TIP# CH 028 CONG DIST. 6
FUND SOURCE: .BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CHEROKEE SR 140 FM RANCHETTE RD TO CR 72130X UNKNOWN/ UNKNOWN
LENGTH (Miles/km)': . 00/. 00000 MANAGER: RAY METTS STATUS:
311:BR@ - EXIST.
LITTLE RVR/SEE FULTON LANES: 0 /PROPOSED LANES:
ATLANTA TIP# FN 013CONG DIST. 0 & 0
0
FUND SOURCE: SURFACE ~RANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721305 IS AN ASSOCIATED PROJECT.
CHEROKEE SR 140/HOUZE RD@ LITTLE RIVER@ CHEROKEE CO LINE- 721308
ATLANTA TIP# FN 013
72130Z UNKNOWN/ UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RAY METTS
FUND SOURCE: BRIDGE PROGRAM
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
721308 IS AN ASSOCIATED PROJECT.
21-Sep-1995 Page 10
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW LOCL
CONST 1996
$
351
FED SHARE $
281
GA. SHARE $
70
0TH SHARE $
PE LOCL
ROW LOCL
CONST 1996
$
175
FED SHARE $
140
GA. SHARE $
0TH SHARE $
35
PE 1996
$
10
RO.W LOCL
CONST 1998
$
838
FED SHARE $
670
GA. SHARE $
168
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST.NONE
$
0
PE NONE
.o
ROW NONE.
0
CONST NONE
0
. '
"
li!!R!i8
~
~
Ml
"
GEORGIA DEPARTMENT OF TRANSPORTATION
21-Sep-1995
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 11
PROJECT LISTING BY RDC FY 1996/FY 1998
COUNTY
DESCRIPTION
ARC
FISCAL
COST
P.I.NO.
------------.
PROJECT DATA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
YEAR
ESTS
----------------------------------------------------------------------------------------------------------------------
CLAYTON CAPITAL IMPROVEMENT - PARK & RIDE LOTS AT SR85@ POINTE
ATLANTA TIP fl
7D7518 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 3
FUNDS RECIPIENT: CLAYTON COUNTY
CAPITAL 1996
$ 1303
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
FED SHARE$ 1042
STATUS: SOUTH PKW, US41/19@ LOVEJOY RD. AND SR314@ SR138
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
131
0TH SHARE$
130
CLAYTON 7Vl012
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
ATLANTA TIP fl
CONG DIST. 3
CAPITAL 1996
$
30
,FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
CLAYTON 7V7008
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH.
ATLANTA TIP fl
CONG DIST. 3
CAPITAL 1997
$
30
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
24
FEDERAL TRANSIT ADMIN _FUNDS
GA. SHARE $
3
0TH SHARE $
3
CLAYTON 7V7023
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
ATLANTA TIP f
CONG DIST. 3
CAPITAL 1998
$
30
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
CLAYTON SR 42 FM SR 138/STOCK'GE TO I-675 NB RAMPS;&CULVERT/HENRY
ATLANTA TIP fl CL64/HE5
PE NONE
$
0
32205X UNKNOWN/ UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE $
0
MANAGER: M. REYNOLDS
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
322050 IS AN ASSOCIATED PROJECT.
CLAYTON 712425
STATUS:
I-75 FM SR 3/US 41/0LD DIXIE HWY TO I-285 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 2.90/4.66610 MANAGER: J. GRAYBEAL
ATLANTA TIP fl CL-R 011 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$ 1000 AFTER 98
AFTER 98
CLAYTON 712430
STATUS:
I-285@ CONLEY ROAD BRIDGES/ RECST. OR REHAB. LENGTH(Miles/km): .10/.16090 MANAGER: G. ROSS REQ CO DO ROW, UTILITIES & APPROACHES 10-7-87
ATLANTA TIP fl CL 004 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1988 ROW LOCL CONST
UNDERWAY AFTER 98
GEORGIA DEPARTMENT OF TRANSPORTATION
21-Sep-1995
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 12
PROJECT LISTING BY RDC FY 1996/FY 1998
COUNTY
DESCRIPTION
ARC
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A---------R-E-G-I-O-N-A-L--D-E-V-E-L-O-P-M-E-N-T--C-O-M--M-I-S-SI-O-N-------C-O-M-M--EN-T-S---------------------------Y-EA--R--------E-S-T-S--
CLAYTON LEE STREET. IN MORROW OVER I-75
ATLANTA TIP# CL 059
PE 1992 UNDERWAY
712602 BRIDGES/ NEW CONSTRUCTION
CONG DIST.. 3
ROW LOCL
LENGTH(Miles/km): .08/.12872
CONST 1998
$ 1113
MANAGER: M. REYNOLDS
FUND. SOURCE: NAT'L HIGHWAY
FED SHARE $
890
STATUS: COUNTY SGN DO ROW, UTIL, CONST ROADWAY & APPROACHES 2-15-94
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
223
712630 IS AN ASSOCIATED PROJECT.
0TH SHARE $
CLAYTON 712630
STATUS:
I-75/MORROW@ SR 54 (INCL RR BRIDGE OVER I-75) INTERCHANGE/ RECST. OR REHAB. LENGTH (Miles/km): . 23/.. 37007 - EXIST. LANES: 4 MANAGER: M. REYNOLDS DOT TO PAY 9-2-92
/PROPOSED
LANES:
ATLANTA TIP'# CL-R 031 CONG DIST. 3 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 751295 IS AN ASSOCIATED PROJECT ..
PE 1992 UNDERWAY
ROW 1997
$
53
CONST 1998
$, 7765
FED SHARE $ 6212
GA. SHARE $ 1553
0TH SHARE $
CLAYTON 713050
STATUS:
I-675, I-75, I-20: IMPACT ATTENUATORS IMPACT ATTENTUATORS / SAFETY LENGTH(Miles/km): .00/.00000 - EXIST: MANAGER: SAM ZEIGLER NOT APPLICABLE
& BARRIER WALL AT BR LANES: 0 /PROPOSED LANES:
ATLANTA TIP# R 130 CONG DIST. 3 & S 0 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1996 $ 1000
FED SHARE $ 1000
GA. SHARE $
0TH SHARE $
CLAYTON 713070
STATUS:
I-75, I-85, I-20, I-285 & I-675@ VARIOUS LOC IN METRO ATL
ATLANTA TIP# R 130
GUARDRAIL/ MAINTENANCE
CONG DIST. 5
LENGTH(Miles/km): 34.00/54.. 70600 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST 1996
$
523
FED SHARE $
523
GA. SHARE $
0TH SHARE $.
CLAYTON 713210
STATUS:
I-285 EAST TO I-75 SOUTH RAMP ALIGNMENT
ATLANTA TIP# CL-R 179
RAMP/ RECST. OR REHAB.
CONG DIST, 3
LENGTH(Miles/km): ,00/.00000 - EXIST. LANES: 2 /PROPOSED LANES: 2
.
MANAGER: D. SMITH
FUND SOURCE-: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
- PE 1995 UNDERWAY
ROW 1997
$
so
CONST 1998
$
335
FED SHARE $
302
GA. SHARE $
34
0TH SHARE $
CLAYTON 713500
STATUS:
I-285 DRAINAGE IMPROVMENTS@ CLARK HOWELL & AIRPORT LOOP MISCELLANEOUS IMPROVEMENTS/ MAINTENANCE LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED MANAGER: G. ROSS NOT APPLICABLE
RD LANES:
ATLANTA TIP# CL-R 212 CONG DIST. 3 0 FUND SOURCE: I-STATE MAINT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW~NONE $
0
CONST 1997 $ 2000
FED SHARE $ 1800
GA, SHARE $
200
0TH SHARE $
CLAYTON 720815
STATUS:
SR 42 FM LAKE HARBIN RD N TO ANVIL BLOCK RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES, LENGTH(Miles/km): 3,20/5.14880 MANAGER: M, REYNOLDS _
REQ CLAYTON COUNTY DO UTILITIES 12-2~91
ATLANTA TIP# CL 012 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 720817 IS AN ASSOCIATED PROJECT.
PE 1992 ROW CONST
UNDERWAY
AFTER 98 AFTER 98
il!l!@I
MH
GEORGIA DEPARTMENT OF TRANSPORTATION
21-Sep-1995
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 13
PROJECT LISTING BY RDC FY 1996/FY 1998
COUNTY
DESCRIPTION
ARC
FISCAL
COST
P.I.NO.
PROJECT DATA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
YEAR
ESTS
--------------------------------------------------------------------------------------------------------------------- -------------
CLAYTON SR 42/MACON HWY@ UPTON CREEK
ATLANTA TIP# CL 079
PE 1992
UNDERWAY
720817 REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
CONG DIST. 3
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000
CONST
AFTER 98
MANAGER: M. REYNOLDS
FUND SOURCE: BRIDGE PROGRAM
STATUS: REQ CLAYTON COUNTY DO UTILITIES 12-2-91
FEDERAL HIGHWAY ADMIN FUNDS
720815 IS AN ASSOCIATED PROJECT.
CLAYTON SR 54 (& FAYETTE CO) @ MORNING & CAMP CRKS; & FLINT RIVER 721040 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
LENGTH(Miles/km): 1.20/1.93080 .MANAGER: D. GODWIN STATUS: CLAYTON SGN 6/85 FOR UTILITIES;DOT DO FAYETTE UTIL 4-5-95
ATLANTA TIP# CL23/FY2
CONG DIST. 3
.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 UNDERWAY
ROW 1994
UNDERWAY
CONST 1996
$ 4555
FED SHARE $ 3644
GA. SHARE $
911
0TH SHARE $
CLAYTON 721290
STATUS:
SR 85 FM SR 279/FAYETTE N TO 6-LN@ ROBERTS DR/CLAYTON RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 4.10/6.59690 MANAGER: K. FULBRIGHT REQ FAYETTE UTL 8/94;CLAYTON SGN 7/89 & DOT ASSIST W/GAS LIN
ATLANTA TIP# CL15/FY4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72129X IS AN ASSOCIATED PROJECT.
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
CLAYTON 721295
STATUS:
SR 85 NBL@ CAMP CREEK@ FAYETTE CO LINE REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): .03/.04827 MANAGER: K. FULBRIGHT CLAYTON SGN 7/89/DOT ASSIST GAS LINES;REQ FAYETTE UTIL 8/94
ATLANTA TIP# CL 077 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72129Y IS AN ASSOCIATED PROJECT.
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 98
CLAYTON SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 ... SEE FAYETTE CO,
ATLANTA TIP# CL41/FY10
PE NONE
$
0
72144X UNKNOWN/ UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: M. REYNOLDS
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMiN FUNDS
721440 IS AN ASSOCIATED PROJECT.
CLAYTON 721480
STATUS:
SR 138 FM WALT STEPHENS RD EAST TO I-75/HENRY CO RECONSTRUCTION & WIDENING FROM 2 LANES-TO 4 LANES. LENGTH(Miles/km): 3.55/5,71195 MANAGER: J. GARLAND REQ CLAYTON & HENRY COUNTIES DO UTILITIES 6-7-90.
ATLANTA TIP# CL 031 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1997 CONST
UNDERWAY $ 4970 AFTER 98
CLAYTON 721550
STATUS:
SR 85 FM ADAMS DR TO RAMP@ I-75/INCL INTCH@ FOREST PKWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. LENGTH(Miles/km): 3.10/4.98790 MANAGER: KEVIN HOSEY
ATLANTA TIP# CL 014 CONG DIST. 3 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
COUNTY P.I.NO.
DESCRIPTION .PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
CLAYTON 721860
STATUS:
TARA BLVD@ I-75 {GATEWAY PROJECT) LANDSCAPING/ ENHANCEMENT LENGTH{Miles/km): .00/.00000 - EXIST. LANES: 6 /PROPOSED LANES: MANAGER: UNKNOWN COUNTY SGN PE, 50% LANDSCAPING, 100 MONUMENT& MAINT 11-1-94
ATLANTA TIP. # R 122 CONG DIST. 3
6
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 731070
STATUS:
TARA BLVD AT OLD DIXIE HWY
ATLANTA TIP# CL 084
INTERSECTION IMPROVEMENT/ SAFETY
CONG DIST. 3
LENGTH(Miles/km): 1.00/1~60900 - EXIST. LANES: 3 /PROPOSED LANES: 4
MANAGER: D. GODWIN
FUND-SOURCE: NAT'L HIGHWAY
COUNTY SIGNED 3-2~93 FOR UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 731090
STATUS:
SR 42 AT DOUBLE BRIDGE ROAD
ATLANTA TIP# CL 088
INTERSECTION IMPROVEMENT/ SAFETY
CONG DIST. 3
LENGTH(Miles/km): .20/.32180 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN
FUND SOURCE: HWY. SAFETY
REV REQ CLAYTON DO ROW & UTILITIES 9-22-94
FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 731520
STATUS:
SR 3/US 19@ CEN OF GA RAILROAD .35 MIS OF JCT I-285 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .26/ .41834 MANAGER: D. GODWIN
ATLANTA TIP# CL 095 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 14
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST 1996
$
120
FED SHARE $
60
GA. SHARE $
0TH SHARE $
60
PE- 1994 UNDERWAY
ROW 1994
UNDERWAY
CONST 1996
$
481
FED SHARE $
481
GA. SHARE $
0TH SHARE $
PE NONE
$
0
ROW LOCL
CONST 1996 $
25
FED SHARE $
23
GA. SHARE $
3
0TH SHARE $
PE 1996 ROW 1998 CONST
$
40
$
100
AFTER 98
CLAYTON 751730
STATUS:
CR 1342/BATTLE CREEK RD@ JESTERS CREEK REHAB. OF THE EXISTING BRIDGE{S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .80/1.28720 MANAGER: D. GODWIN CLAYTON SIGNED 6/6/89 FOR ROW AND UTILITIES.
CLAYTON 751770
STATUS:
BATTLECREEK~MT.ZION FM SOUTHLAKE PKWY TO LAKE HARBIN RD
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.63/4.23167 MANAGER: J. GRAYBEAL .CLAYTON COUNTY SIGNED 3-5-91 FOR ROW AND UTILITIES.
ATLANTA TIP# CL 017 CONG DIST. 3
FUND SOURCE: BRIDGE .PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP.# CL 019 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1991 UNDERWAY
ROW LOCL
CONST 1996
$
409
FED SHARE $
327
GA. SHARE $
82
0TH SHARE $
PE 1997 ROW LOCL CONST
$
10
AFTER 98
CLAYTON BATTLE CREEK RD FM VALLEY HILL RD TO SOUTHLAKE PKWY
751775 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH{Miles/km): 1.98/3.18582
- MANAGER: D. GODWIN
.
STATUS: CLAYTON COUNTY SIGNED 6-4-91 FOR._ROW &. UTILITIES
ATLANTA TIP# CL 075 CONG DIST. 3-
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
10
AFTER 98
-
COUNTY P.I.NO.
l!!!!!!!I!
DESCRIPTION PROJECT DATA
ll!i8
~
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
f.:::.ii:lii9
CLAYTON 751855
STATUS:
SR 314/FAYETTEVILLE RD FM NORMAN DR/CR 255 TO SR 139 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 1.70/2.73530
MANAGER: M. GANNAWAY REQ CLAYTON & COLLEGE PARK DO UTILITIES 10-30-91
ATLANTA TIP# CL62/CL5 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS -
1!")!1i~,:l
21-Sep-1995 Page 15
FISCAL YEAR
COST ESTS
PE 1993 ROW CONST
UNDERWAY AFTER 98 AFTER 98
CLAYTON 752060
STATUS:
MORROW RD/CR 1348@ JESTER'S CREEK REPLACEMENT OF T.HE EXISTING BRIDGES (S). NO ADDED LANES. LENGTH(Miles/km): .20/.32180 MANAGER: D. GODWIN CLAYTON COUNTY SGN ROW, UTILITIES & DETOURS 6-2-92.
ATLANTA TIP# CL 078 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 752590
STATUS:
BETHSAIDA RD EXT FM SR 85 TO CHURCH ST & CTR TN LN ON CHURCH RECONSTRUCTION & WIDENING FROM 3 LANES TO 5 LANES. LENGTH(Miles/km): 1.07/1.72163 MANAGER: NEIL DAVIS COUNTY SGN CT FOR PE, ROW & UTILITIES 8-25-95
ATLANTA TIP# CL 052 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 752600
STATUS:
BETHSAIDA RD EXT FM ROBERTS DR TO UPPER R'DALE RD ON N LOC CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH(Miles/km): 1.15/1.85035 MANAGER: NEIL DAVIS CT REQ COUNTY DO PE, ROW & UTILITIES 4-12-95
ATLANTA TIP# CL 052 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 770230
STATUS:
CR 226/TERRELL MILL RD@ FLINT RIVER REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES,
LENGTH(Miles/km): .15/.24135 MANAGER: D. GODWIN CLAYTON CO SIGNED 11/12/88 FOR ROW & UTILITIES
ATLANTA TIP# CL 091 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 762150 IS AN ASSOCIATED PROJECT.
CLAYTON 770460
STATUS:
JESTERS CK GREENWAY FM JONESBORO TO MORROW
ATLANTA TIP# CL 089
BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST. 3
LENGTH(Miles/km): 4,00/6,43600 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CRANFORD
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FONDS
CLAYTON 770500
STATUS:
HISTORIC DEPOT RESTORATION IN JONESBORO
ATLANTA TIP# CL 090
HISTORIC FACILITIES/ ENHANCEMENT
CONG DIST. 3
LENGTH(Miles/km): ,00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CRANFORD
FUND SOURCE: TRANS. ENHANCE.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1996
$
388
FED SHARE $
310
GA. SHARE $
78
0TH SHARE $
PE 1997
$
25
ROW LOCL
CONST 1998
$
808
FED SHARE $
646
GA. SHARE $
;J.62
0TH SHARE $
PE 1997
$
ROW LOCL
CONST 1998 $
FED SHARE $
GA. SHARE $
0TH SHARE $
25
1531 1225
306
PE 1995 UNDERWAY
ROW LOCL
CONST 1998
$
321
FED SHARE $
257
GA. SHARE $
64
0TH SHARE $
PE 1995 UNDERWAY
ROW 1996
$
300
CONST 1996 $ 1364
FED SHARE $ 1017
GA. SHARE $
0TH SHARE $
347
PE LOCL
ROW LOCL
CONST 1996 $
94
FED SHARE $
75
GA, SHARE $
0TH SHARE $
19
GEORGIA DEPARTMENT.OF TRANSPORTATION
21-Sep-1995
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 16
PROJECT LISTING BY RDC FY 1996/FY 1998
COUNTY
DESCRIPTION
ARC
FISCAL
COST
C-PL-A-.IY-.T-NO-ON--. -N-O-N---FR-E-E-W-A-Y---SU-P-RR-VO-E-JILE-LC-AT-N-CD-E-A-TA-SY--ST-E-M---IN--R-EC-GL-AIOYNT-AO-NL--DC-OE-VU-NE-LT-OY-P-M-E-N-T--C-O-M--M-I-SS-I-O-N-A-T-L-A-N-T-CA-O-MT-MI-P-EN-iT-S-R--1-9-0---------------------P-EY-E-AN-RO--N-E-----$-E-S-T-S--o
770693 MISCELLANEOUS IMPROVEMENTS/ SAFETY
CONG DIST. 3 & 5
ROW NONE $
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1996 $ 481
MANAGER: SAM ZEIGLER
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE$
385
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
96
0TH SHARE$
CLAYTON NON-FREEWAY COMMUNICATIONS FIBER OPTIC CABLE IN CLAYTON CO.
ATLANTA TIP i R 098
PE NONE $
0
770890 MISCELLANEOUS IMPROVEMENTS/ SAFETY
CONG DIST. 3 & 5
ROW NONE $
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1996
$
300
MANAGER: SAM ZEIGLER
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE$ 240
STATUS: OTO WILL NOTIFY
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
60
0TH SHARE $'
CLAYTON 770972
STATUS:
BICYCLE RACKS FOR CLAYTON COUNTY BICYCLE/PED. FACILITY/ ENHANCEMENT LENGTH(Miles/km): .00/.00000 - EXIST. MANAGER: UNKNOWN TO BE DONE BY CONTRACT
LANES:
0 /PROPOSED
LANES:
ATLANTA TIP i R 177
CONG DIST. 3 & 5
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE $
0
CONST.1996
$.
13
FED SHARE $
10
GA. SHARE $
0TH SHARE $
3
..
!l!!!!!!IJ ~
COUNTY P.I.NO.
~
DESCRIPTION PROJECT DATA
-~ ~I '
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
_
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
COBB 7D7030
STATUS:
MULTI-USE TRANSIT FACILTIY, PARK & RIDE TRANSFER CENTERS, TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH WHEELCHAIR LIFT REPLACEMENTS, & FACILITY _IMPROVEMENTS
ATLANTA TIP lt CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
1:j")".~ ., ~
21-Sep-1995 Page 17
FISCAL YEAR
COST ESTS
CAPITAL 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
2640 2112
264 264
COBB 7D7045
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1996 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
ATLANTA TIP lt CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
4186 464
3722
COBB 7D7513
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1997 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
ATLANTA TIP lt CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
4168 446
3722
COBB 7D7514
STATUS:
CAPITAL/PLANNING~ TRANSIT BUSES - 6, PARATRANSIT BUSES - 5, TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH WHEELCHAIR LIFTS REPLACEMENT - 12, FACILITY IMPROVEMENTS.
ATLANTA TIP lt CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
2765 2212
553
COBB 7D7524
STATUS:
CONSTRUCTION PROGRAM - MULTI-USE TRANSIT FACILITY TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
ATLANTA TIP lt
CONG DIST. 6 & 7.
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
OTH SHARE $
5000 4000
1000
COBB 7D7532
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1998 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: MANAGER: STEVE KISH
ATLANTA TIP lt CONG DIST. 7 & 6
FUND SOURCE: _URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
FED SHARE $
GA. SHARE $
0TH SHARE $
4168 446
3722
COBB 7D7533
STATUS:
CAPITAL/PLANNING - ALTERNATIVE FUEL BUSES, PARATRANSIT BUSES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH REPLACEMENT SUPERVISORS VEHICLE, SHORT RANGE TRANSIT PLAN.
ATLANTA TIP lt CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$
FED SHARE $
GA. SHARE $
0TH SHARE $
2640 2112
264 264
COUNTY P,I,NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
21-Sep-1995 Page 18
FISCAL YEAR
COST ESTS
COBB 7V1015
STATUS:
ELDERLY AND DISABLED VEHICLES AND'.EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE.KISH
ATLANTA TIP#
CONG DIST. 7 & 6
CAPITAL 1996
$
75
FqND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
60
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
0TH SHARE $
8
COBB 7V7009
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH
ATLANTA TIP#
CONG DIST. 7 & 6
CAPITAL 1997
$
75
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE $
60
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
0TH SHARE $
-8
COBB 7V7024
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH .
ATLANTA TIP#
CONG DIST. 7 & 6
CAPITAL 1998
$
76
FUND SOURCE: ELDERLY & DISABLED F.UND
FED SHARE $
61
FEDERAL TRANSIT ADMIN FUNDS
'GA. SHARE $
8
0TH SHARE $
8
COBB 712752
ST~TUS:
WINDY HILL RELIEVER FM COBB PKWY TO THE I-75 BRIDGE; PHASE 2
RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. LENGTH(Miles/km): .70/1.12630 MANAGER: G. ROSS COBB SGN 3-26-93 UTIL/PE/ROW EXECPT FROM us 41 TO CIRCLE 75
ATLANTA TIP# CO 171 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
$
ROW 1997 $
CONST 1997
$
FED SHARE$
GA. SHARE$
0TH SHARE$
5 1200 1452 1162
290
COBB
-EAST-WEST CONN INTCH W/I-285 E RAMPS & ATLANTA RD BRIDGE,PH2
712760 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED.
LENGTH(Miles/km): .00/.00000 .
MANAGER: G. ROSS
STATUS:. COBB SGN DO UTILITIES, 100% PE AND 50% ROW COST 3-26-93
ATLANTA TIP# CO-R 070. CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
COBB 712762
STATUS:
EAST-WEST CONN@ I-285 W RAMPS AND CD ROADS; PHASE 3 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. LENGTH(Miles/km): .00/.00000 MANAGER: G. ROSS COBB SGN DO ROW, UTILITIES & 100% PE 3-26-93
ATLANTA TIP# CO-R 070 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
5
AFTER 98
COBB 712806
STATUS:
KENNEDY INTERCHANGE I-75NB TO I-285WB FLYOVER BRIDGE (CT 5)
ATLANTA TIP# CO-R 078
INTERCHANGE/ NEW CONSTRUCTION
CONG DIST. 6
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 2
MANAGER:G. ROSS
,FUND SOURCE: I-STATE MAINT.
SEE 712800
FEDERAL HIGHWAY ADMIN FUNDS
PE 1998 ROW LOCL CONST
$
5
AFTER 98
~
~
tMfj
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
COBB 713240
STATUS:
I-285@ WEST PACES FERRY RD - INTERCHANGE RECST
ATLANTA TIP# CO-R 180
INTERCHANGE/ RECST. OR REHAB.
CONG DIST. 6
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 4 /PROPOSED LANES: 12
MANAGER: G. ROSS
FUND SOURCE: I-STATE MAINT.
COBB SGN CONTRACT FOR PE & UTILITIES 9-14-95;DOT WILL DO ROW
FEDERAL HIGHWAY ADMIN FUNDS
r,:;w.~ ,, ,~r-.~;.}1
21-Sep-1995 Page 19
FISCAL YEAR
COST ESTS
PE 1996 ROW 1998 CONST
UNDERWAY $ 2764 AFTER 98
COBB 720125
STATUS:
N'SIDE PKWY@ CHATTAHOOCHEE RVR INCL APPR/& FULTON CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 6 LANES. LENGTH(Miles/km): 1.01/1.62509 MANAGER: A. ALEXANDER COBB SGN 10-9-79 UTIL; REQ ATLANTA DO UTIL 2-27-90
COBB 721150
STATUS:
SR 3/US 41/COBB PKWY FM AKERS MILL RD TO SPRING ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. LENGTH(Miles/km): .54/.86886 MANAGER: G. ROSS COBB SGN CT 3-12-93--UTILITIES, PE & $100,000 CONSTRUCTION.
COBB 721152
STATUS:
SR 3/US 41/COBB PKWY FM PACES MILL RD TO AKERS MILL ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. LENGTH(Miles/km): .99/1.59291 MANAGER: G. ROSS SEE #721150
ATLANTA TIP# AT12/C024 CONG DIST. 5 & 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72012X IS AN ASSOCIATED PROJECT.
ATLANTA TIP# CO 080 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP# CO 231 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1981 ROW 1985 CONST
UNDERWAY UNDERWAY AFTER 98
PE 1992 UNDERWAY
ROW 1996
$ 2070
CONST 1997 $ 4300
FED SHARE $ 3440
GA. SHARE $
760
0TH SHARE $
100
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
COBB 721250
STATUS:
SR 3/US 41/COBB PKWY FM WINDY HILL RD N TO TERRELL MILL RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. LENGTH(Miles/km): .21/.33789 MANAGER: G. ROSS COBB COUNTY SIGNED 7/14/88 FOR UTILITIES.
ATLANTA TIP# CO 081 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
COBB 721252
.STATUS:
COBB PARKWAY FM S 120 LOOP TON 120 LOOP (PHASE 2) RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. LENGTH(Miles/km): .69/1.11021 MANAGER: G. ROSS COUNTY SGN 7-14-88 FOR UTILITIES. (SEE #721250)
ATLANTA TIP# CO 081 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE ROW CONST
$
0
AFTER 98
AFTER 98
COBB 721254
STATUS:
SR 3/US 41/COBB PKWY FM SPRING RD NORTH TO WINDY HILL ROAD
RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. LENGTH(Miles/km): 1.48/2.38132
MANAGER: G. ROSS COBB COUNTY SIGNED 7/14/88 FOR UTILITIES; SEE 721250
ATLANTA TIP# CO 081 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE ROW CONST
$
0
AFTER 98
AFTER 98
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGION.AL DEVELOPMENT COMMISSION
COMMENTS
COBB 721256
STATUS:
COBB PARKWAY FM TERRELL MILL RD TO SOUTH 120 LOOP (PH 4,5) RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. LENGTH(Miles/km): 3.01/4.84309 MANAGER: G. ROSS COUNTY SGN 7-14-88 FOR UTILITIES. (SEE i721250)
ATLANTA TIP# CO 081 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 20
FISCAL YEAR
COST ESTS
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
COBB 721310
STATUS:
SR 120/ROSWELL RD FM SR 120LP TO PIEDMONT RD/MARIETTA/72Y310 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
LENGTH(Miles/km): 1.43/2.30087 MANAGER: D. SMITH COBB REFUSED 5-23-91 UNTIL MORE SPECIFIC DESIGN IS COMPLETED
COBB 721670
STATUS:
S.MARS HILL EXT FM OLD US 278/SR6 BUS TO SR 120/DALLAS HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 5.44/8.75296 MANAGER: D. SMITH COBB SGN CONTRACT 1-5-95 FOR PE & UTILITIES.
ATLANTA TIP# CO 177 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72Y310 IS AN ASSOCIATED PROJECT.
ATLANTA TIP# CO 123 CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW 1998 CONST
PE 1992 ROW CONST
$
80
$ 1900
AFTER 98
UNDERWAY
AFTER 98 AFTER 90
COBB 721680
STATUS:
SR 176/MARS HILL RD FRM SR 120/DALLAS HWY TO STILESBORO RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.35/6.99915 MANAGER: D, SMITH COBB SGN CONTRACT 1-5-95 FOR PE & UTILITIES
COBB 721685
STATUS:
MARS HILL RD FM STILESBORO RD TO SR 3/COBB PARKWAY
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.13/5.03617
MANAGER: D. SMITH
.
COBB SGN CONTRACT 1-5-95 FOR PE & UTILITIES
COBB 721690
STATUS:
N.MARS HILL EXT FM SR 3/COBB PKWY TO I-75/BARTOW COUNTY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH (Miles/km) : 4 .15/6 .-67735
MANAGER: D. SMITH COBB SIGNED CONTRACT 1-5-95 FOR PE,& UTILITIES
COBB 72Y125
STATUS:
I
NORTHSIDE PKWY.@ CHATTAHOOCHEE RVR- FOR 33C $; SEE 720125
BRIDGES/ RECST. OR REHAB. LENGTH(Miles/km): 1.00/1.60900 MANAGER: A. ALEXANDER LGPA NOT APPLICABLE FOR THIS PROJECT
ATLANTA .TIP# CO 124 CONG DIST. 6 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP# CO 124 CONG DIST. 6 FUND SOURCE: NAT'L' HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP# CO 122 CONG DIST. 6 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1996 $ 6685 CONST 1998 $. --8665
FED SHARE $ 6932
GA. SHARE $ 1733 0TH SHARE $
PE NONE $ ROW 1996 $ CONST 1998 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
4880 6320 5056 1264
PE 1992 ROW CONST
UNDERWAY AFTER.98 AFTER 98
ATLANTA TIP# AT12/C024 CONG DIST. 6 & 5
FUND SOURCE: SURFACE TRANSPORT, .. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1985 CONST
UNDERWAY UNDERWAY AFTER 98
1!111!!!
11111!!!!!1 li!!l!!!!!!!l
l!!!!i!1!!!
!!!f!!.!!!j
l!!!!!!l!I
.:::'.el( 1 :;; ~
GEORGIA DEPARTMENT OF TRANSPORTATION
21-Sep-1995
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 21
PROJECT LISTING BY RDC FY 1996/FY 1998
COUNTY
DESCRIPTION
ARC
FISCAL
COST
P.I.NO.
--------
---- -----
-P-R-OJE-C--T-DATA---
----RE-G--IO-N-AL
--- DEVELOPMENT
---
C--O-M-M--IS-S-ION -------CO-M--M-E-N-T-S ------------------------.
-Y-E-A-R---------E-S-T-S--
COBB
SR 120/ROSWELL RD FM SR 120LP TO PIEDMONT;FOR ADDL RW;721310
ATLANTA TIP f CO 177
PE NONE
$
0
72Y310 RECONSTRUCTION & WIDENING FROM O LANES TO 6 LANES.
CONG DIST. 6
ROW
AFTER 98
LENGTH(Miles/km): .00/.00000
CONST NONE
$
0
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
721310 IS AN ASSOCIATED PROJECT.
COBB 751430
STATUS:
FRNTG RD 1-WY PAIR FM ROTTENWOOD CK TO NORTHSIOE DR/FULTON RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. LENGTH(Miles/km): 1.70/2.73530
MANAGER: D. SMITH
ATLANTA TIP# CO-R 067 CONG DIST. 6 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 98
COBB 752220
STATUS:
SR 6 BUS OVER POWDER SPRINGS CRK W. OF POWDER SPRINGS REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. LENGTH(Miles/km): .00/.00000
MANAGER: D. GODWIN SEND LGPA IN 1996
ATLANTA TIP# CO 247 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COBB 7 522 60
STATUS:
SR 6 BUS REALIGNMENT WITH BROWNSVILLE RD & POWDER SPRINGS RD
INTERSECTION IMPROVEMENT/ SAFETY
LENGTH(Miles/km): .25/.40225 - EXIST. LANES: 2 /PROPOSED LANES:
MANAGER: D. GODWIN
POWDER SPRINGS SGN ROW & UTILITIES 9-8-92
T&S
ATLANTA TIP f CO 248 CONG DIST. 7
3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
COBB 752290
STATUS:
KENNEDY INTCH-MILL GREEN PKWY FM AKERS MILL TO INT. CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 1.00/1.60900 MANAGER: G. ROSS COBB SGN DO ROW, UTILITIES & 100% PE 3-26-93
N PKWY
COBB 752295
STATUS:
KENNEDY INTCH-RIVERWOOD PKWY FM US 41 TO CUMBERLAND CIRCLE CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. LENGTH (Miles/km) : . 50/. 80450 MANAGER: G. ROSS COBB SGN DO ROW, UTILITIES & 100% PE 3-26-93
ATLANTA TIP f CO-R 078 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS 75Y290 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f CO-R 078 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1995
UNDERWAY
ROW 1997
$
1
CONST 1998
$
800
FED SHARE $
640
GA. SHARE $
160
0TH SHARE $
PE 1994
UNDERWAY
ROW LOCL
CONST 1996
$
393
FED SHARE $
354
GA. SHARE $
39
0TH SHARE $
PE 1996 ROW LOCL CONST
$
5
AFTER 98
PE 1996 ROW LOCL CONST
UNDERWAY AFTER 98
COBB 752310
STATUS:
OLD CANTON RD OVER SHEFFER CK TRIBUTARY/SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
LENGTH (Miles/km) : . 40/. 64360 MANAGER: D. GODWIN COBB SGN CONTRACT FOR PE, ROW & UTILITIES 10-24-94
ATLANTA TIP# CO 246 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW LOCL
CONST 1996
$
741
FED SHARE $
593
GA. SHARE $
148
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
COBB 770350
STATUS:
OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN , CONTRACT SIGNED FOR.PE, ROW & UTILITIES'.3-17-95
ATLANTA TIP. f CO 239
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COBB 770360
STATUS:
HIRAM RD/CR 2081 OVER POWDER SPRINGS CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. LENGTH(Miles/km): .40/.64360
MANAGER: D. GODWIN
CONTRACT SGN PE, ROW & UTILITIES 3-22-95
ATLANTA TIP# CO 245 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COBB 770370.
STATUS:
FRIENDSHIP CHURCH RD/CR 942 OVER MUD CREEK TRIBUTARY REPLACEMENT OF THE EXISTING BRIDGES (S) . NO ADDED LANES. LENGTH(Miles/km): .40/.64360 MANAGER: D. GODWIN CONTRACT SIGNED 3-22~95 FOR PE, ROW & UTILITIES
ATLANTA TIP.# CO 240 CONG DIST. 6
FUND 'soURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FU~DS
COBB 770470
STATUS:
HISTORIC DEPOT RENOVATION IN-KENNESAW-AND WALKWAYS HISTORIC FACILITIES/ ENHANCEMENT LENGTH(Mi"les/kffi): :;oo; ,00000 - EXIST'. LANES: 0 /PROPOSED LANES: MANAGER: STEVE YOST TO BE DONE BY CONTRACT'
'! ..
ATLANTA TIP f CO 237
CONG DIST. 6
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
COBB 770638"
STATUS, :
MOBILITY ENHANCEMENT FROG: SUBSCRIPTION BUS & VANPOOL SVC MISCELLANEOUS IMPROVEMENTS/ SAFETY LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: SAM ZEIGLER NOT APPLICABLE ,
ATLANTA TIP f R 176 CONG DIST. 6 & 7
0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS 77063D rs AN ASSOCIATED PROJECT.
COBB 770694
STATUS:
NON FREEWAY SURVEILLANCE SYSTEM IN COBB COUNTY MISCELLANEOUS IMPROVEMENTS/ SAFETY LENGTH (Miles/km) : . 00/. 00000 .- EXIST. LANES:_ 0 MANAGER: SAM ZEIGLER, 'LGPA NOT APPLICABLE
/PROfOSED LANES:
ATLANTA TIP f R 190 CONG DIST. 6 & 7
0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
COBB 770730
STATUS:
CONCORD COVERED BR/CONCORD RD OVER NICKAJACK CREEK
BRIDGES/ ENHANCEMENT LENGTH(Miles/km): .00/.00000
MANAGER: GAIL D'AVINO DOT.WILL PROVIDE THE 20% MATCH
ATLANTA TIP f CO 251
CONG DIST. 6
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY,ADMIN FuNDs
.
'
. ,
21-Sep-1995 Page 22
FISCAL YEAR.
COST ESTS
PE 1996
$
5
ROW LOCL
CONST 1997
$
166
FED SHARE $
133
GA. SHARE $
33
0TH SHARE $
PE 1996
$
5
ROW LOCL
CONST 1997
$
299
FED SHARE $
239
GA. SHARE $
60
0TH SHARE $
PE 1996 $
5
'ROW LOCL
CONST 1997
$
127
FED SHARE $ 102
GA. SHARE$
25
0TH SHARE'$
PE LOCL
ROW LOCL
CONST 1996 $ 156
FED SHARE $ 125
GA. SHARE $
0TH SHARE $
31
PE 1996
$
ROW NONE
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
5 0 1506 ... 1200
300
PE NONE
$
0
ROW NONE
$
0
CONST 1996
$
481
FED SHARE $
385
GA. SHARE $
96
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST 1996
$
35
FED SHARE $
. 28
GA. SHARE $
7
0TH SHARE $
-.
l!!!!l!!!!I
tlll!!ll!!!I l!l!!!!!!B !!!11!!!!!1 I!!!!!!!! !!'!!!!!!! !!!!!!!!
l!!!!!!!!!l
!!!!!!I
I. -~; ~
COUNTY P.I,NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
21-Sep-1995 Page 23
FISCAL YEAR
COST ESTS
COBB
NON-FREEWAY COMMUNICATIONS FIBER OPTIC CABLE IN COBB COUNTY
ATLANTA TIP t R 098
PE NONE $
0
770893 MISCELLANEOUS IMPROVEMENTS/ SAFETY
CONG DIST. 6 & 7
ROW NONE $
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1996 $ 300
MANAGER: SAM ZEIGLER
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE$ 240
STATUS: OTO WILL NOTIFY
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
60
0TH SHARE$
COBB 770920
STATUS:
SPRING ROAD FROM VILLAGE PKWY TO CAMPBELL ROAD BICYCLE/PED, FACILITY/ ENHANCEMENT LENGTH(Miles/km): .70/1.12630 - EXIST. LANES: 0 MANAGER: UNKNOWN TO BE DONE BY CONTRACT
/PROPOSED
LANES:
ATLANTA TIP# R 177 CONG DIST. 6
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW NONE
$
0
CONST 1997 $
91
FED SHARE $
73
GA. SHARE $
0TH SHARE $
18
COBB 770921
STATUS:
WINDY HILL RD FM COBB PKWY TO ATLANTA ROAD
ATLANTA TIP# R 177
BICYCLE/PED, FACILITY/ ENHANCEMENT
CONG DIST. 6 & 7
LENGTH(Miles/km): 4.20/6.75780--=-EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW NONE
$
0
CONST 1996
$
650
FED SHARE $
520
GA. SHARE $
0TH SHARE $
130
COBB 770922
STATUS:
VILLAGE PKWY FM SPRING RD TO WINDY HILL ROAD
ATLANTA TIP# R 177
BICYCLE/PED, FACILITY/ ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 1,20/1.93080 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW NONE
$
0
CONST 1996
$
165
FED SHARE $
132
GA. SHARE $
0TH SHARE $
33
COBB 770930
STATUS:
COBB PKWY FM LAKE PARK DR TO SPRING RD
ATLANTA TIP# R 177
SIDEWALKS/ ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): 2.00/3.21800 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW NONE
$
0
CONST 1997
$
272
FED SHARE $ 218
GA. SHARE $
0TH SHARE $
54
COBB 770931
STATUS:
AUSTELL ROAD & CIRCLE 75 PARKWAY
ATLANTA TIP f R 177
SIDEWALKS/ ENHANCEMENT
CONG DIST. 7 & 6
LENGTH(Miles/km): 6.00/9.65400 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW NONE
$
0
CONST 1996
$
765
FED SHARE $
612
GA. SHARE $
0TH SHARE $
153
COBB 770960
STATUS:
SIDEWALKS FOR TRANSIT@ TOWN CENTER AREA
ATLANTA TIP# R 165
SIDEWALKS/ ENHANCEMENT
CONG DIST, 6
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1997
$
429
FED SHARE $
343
GA. SHARE $
0TH SHARE $
86
--------- ----------
COUNTY P,I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
COBB 770962
STATUS:
SIDEWALKS FOR TRANSIT@ CUMBERLAND-GALLERIA AREA SIDEWALKS/ ENHANCEMENT LENGTH (Miles/km) : . 00/. 00000 - EXIST. LANES: 0 /PROPOSED MANAGER: UNKNOWN
TO BE DONE BY CONTRACT
LANES:
ATLANTA TIP f R 1'65
CONG DIST. 6
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
COBB 770963
STATUS:
SIDEWALKS FOR TRANSIT @ WILDWOOD-INTERSTATE NORTH AREA
ATLANTA TIP # R 165
SIDEWALKS/ ENHANCEMENT
.. CONG DIST, 6
LENGTH(Miles/km): .00/ ,00000 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN.
FUND SOURCE: CONG MIT,/AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
COBB 770964
STATUS:
SIDEWALKS FOR TRANSIT@ SOUTH COBB DRIVE AREA
ATLANTA TIP# R 165
SIDEWALKS/ ENHANCEMENT
CONG DIST. 6
LENGTH(Miles/km): .00/,00000 "EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: CONG MIT,/AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
COBB . : SIDEWALKS FOR TRANSIT @ SR 120, FRANKLIN RD & DELK RD
770966 SIDEWALKS/ ENHANCEMENT
LENGTH (Miles/km): . oo/, 00000 - EXIST. LANES: 0 /PROPOSED
MANAGER: UNKNOWN STATUS: TO BE DONE BY CONTRACT
LANES:
ATLANTA TIP # R 165 CONG DIST. 6
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
COBB 770973
STATUS:
BICYCLE/PEDESTRIAN FOR BIKE AWARENESS BICYCLE/PED, FACILITY/ ENHANCEMENT LENGTH{Miles/km}: ,00/,00000 - EXIST. MANAGER: UNKNOWN TO. "BE DONE BY CONTRACT
SIGNAGE & PARKING FAC' LANES: 0 /PROPOSED LANES:
ATLANTA TIP t R 177
CONG DIST. 6 & 7
0
.
'
FUND SOURCE: CONG MIT,/AIR QUAL
FEDERAL HIGHWAY ADMIN FUNDS
COBB 770981
STATUS:
CCT PARK & RIDE LOTS(2), EXPRESS RTS,
PARK & RIDE LOT/ NEW CONSTRUCTION LENGTH(Miles/km): .00/.00000 - EXIST.
MANAGER: LUKE COUSINS TO BE DONE BY CONTRACT
5 BUSES (REGIONAL) LANES: 0 /PROPOSED
LANES:
ATLANTA TIP# CO-R 198
CONG DIST. 6 & 7
0
.
FUND'SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
COBB 770982
STATUS:
CCT PARK & RIDE L0TS(2), EXPRESS RTS, PARK & RIDE LOT/ NEW CONSTRUCTION LENGTH(Miles/km): .00/,00000 - EXIST. ~MANAGER: LUKE COUSINS'
TO BE DONE BY CONTRACT
5 BUSES LANES: 0
/PROPOSED
LANES:
ATLANTA TIP f CO-R 198
CONG DIST. 6 & 7
0
FUND SOURCE: CONG MIT,/AIR QUAL FEDERAL HIGHWAY ADMiN FUNDS
21-Sep-1995 Page 24
F;ISCAL YEAR
COST ESTS
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1996 $ 174
FED SHARE $
139
GA, SHARE $
0TH SHARE $
:35
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1996
$
444-
FED SHARE $
355
GA. SHARE $
0TH SHARE $
89
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1996
$
374.
FED SHARE $
299
GA. SHARE $
0TH SHARE $
75
PE 1996
UNDERWAY
ROW NONE
$
0
CONST 1996
$
516
FED SHARE $
413
GA. SHARE $
0TH SHARE $
103.
PE 1996 UNDERWAY
ROW NONE
$
0
CONST 1996
$
30
FED SHARE $
24
GA, SHARE $
0TH SHARE $
6
PE NONE
$
0
ROW NONE
$
0
CONST 1997
$ .-- 3410
FED SHARE $ 2728
GA. SHARE $
0TH SHARE $
682
PE NONE
$
ROW NONE
$
CONST 1998
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 530 424.
106
,.
l!l!!!!!!l
COUNTY P,I.NO.
1l!l!!!!!l!I I!!!!!.!!!!
DESCRIPTION PROJECT DATA
!!I!!'@ 11!!!!!!!!1
lf!l!r!l!ll!l lil!!!lll!I
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
COBB 770983
STATUS:
CCT EXPRESS ROUTES FROM PARK & RIDE LOTS
ATLANTA TIP# CO-R 199
TRANSIT PROJECTS/ OPERATIONS
CONG DIST. 6 & 7
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED.LANES: 0
MANAGER: LUKE COUSINS
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
.......,
21-Sep-1995 Page 25
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST 1997
$
500
FED SHARE $
400
GA. SHARE $
0TH SHARE $
100
COBB 770984
STATUS:
CCT EXPRESS ROUTES FROM PARK & RIDE LOTS
ATLANTA TIP# CO-R 199
TRANSIT PROJECTS/ OPERATIONS
CONG DIST. 6 & 7
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: LUKE COUSINS
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST 1998
$
500
FED SHARE $
400
GA. SHARE $
-OTH SHARE $
100
COBB
MOBILITY ENHANCEMENT FROG: SUBSCRIPTION BUS & VANPOOL SVC
ATLANTA TIP f R 176
PE NONE
$
0
770987 TRANSIT PROJECTS/ OPERATIONS
CONG DIST. 6 & 7
ROW NONE
$
0
I
LENGTH{Miles/km): .00/,00000 - EXIST, LANES: 0 /PROPOSED LANES: 0
CONST 1997
$ 1806
!
MANAGER: SAM ZEIGLER
FOND SOURCE: CONG MIT./AIR QUAL
FED SHARE $ 1445
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
0TH SHARE $
361
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
21-Sep-1995 Page 26
FISCAL YEAR
COST ESTS
DEKALB 7D710X
STATUS:
FIXED GUIDEWAY MODERNIZATION PROGRAM -7D7101 UNKNOWN/ UNKNOWN
FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 0 & 0 CONST NONE
FUND SOURCE: URBAN TRANSIT DISC. FEDERAL TRANSIT ADMIN FUNDS 707101 IS AN ASSOCIATED PROJECT.
$
0
DEKALB 7D716X
STATUS:
PUBLIC TRANSIT SERVICE FOR FULTON AND DEKALB COUNTIES UNKNOWN/ UNKNOWN FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 0 & 0
CONST NONE FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS 7D7165 IS AN ASSOCIATED PROJECT.
$
0
DEKALB 7D717X
STATUS:
RAIL CAR OVERHAUL, BUS PURCHASES, CAP. MAINT., ETC. -707176 UNKNOWN/ UNKNOWN FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 0 & 0
CONST NONE FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS 7D7176 IS AN ASSOCIATED PROJECT.
$
0
DEKALB 7D751X
STATUS:
TRANSIT OPERATIONS PROGRAM; SEE FULTON 7D7510 TRANSIT PROJECTS/. OPERATIONS
FUNDS RECIPIENT: MARTA MANAGER: STE\TE KISH
CONG DIST. 5 & 4
OPERATING NONE
$
0
FUND SOURCE: URBAN TRANSIT
FEDERAL TRANSIT ADMIN FUNDS
707510 IS AN ASSOCIATED PROJECT.
DEKALB 7V1018
STATUS:
ELDERLYAND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY MANAGER: STEVE KISH
CONG DIST. 4 & 11
CAPITAL 1996
$
FUND SOURCE:" ELDERLY & DISABLED FUND
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA, SHARE $
0TH SHARE $
80 64
8 8''
DEKALB 7V7010
STATUS:
ELDERLY.AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH
1 '
CONG DIST. 4 & 11
CAPITAL 1997
$
80
FUND SOURCE! ELDERLY & DISABLED FUND
FED SHARE $
64
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
8
0TH SHARE $
8
DEKALB 7V7025
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY MANAGER: STEVE KISH
,.
"'CONG DIST. 4 & 11
CAPITAL 1998
$
80
FUND SOURCE: .ELDERLY & DISABLED FUND
FED SHARE $
64
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $ 0TH SHARE $
., 88
,.
' " t
l l
(.
,.
1!!!!1!!!11 Ill!!!!!!! I!!!!!!!!!!
COUNTY P. I.NO.
l!!!ll!l!!!I I!!!!!!!! l!J!!!!!!!I
DESCRIPTION PROJECT DATA
M!!!!l
l!!!l!l!!l
li!!!!!!l
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
~
DEKALB 11041X
STATUS:
I-85 FM I-285 TO I-985 ... GWINNETT- 110410 UNKNOWN/ UNKNOWN LENGTH(Miles/km): .00/.00000 - EXIST. LANES: MANAGER: UNKNOWN
0 /PROPOSED LANES:
ATLANTA TIP f GW-R 136 CONG DIST. 0 & 0
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 110410 IS AN ASSOCIATED PROJECT.
DEKALB 710325
STATUS:
MORELAND AVE TO OLD ROCKBRIDGE RO; HAMBRICK TO STN MTN PARK
ATLANTA TIP f DK 121
BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST. 5 & 11
LENGTH(Miles/km): 4.90/7.88410 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: SURFACE TRANSPORT.
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 712120
STATUS:
REOAN RD BR WON OVER I-285 BRIDGES/ RECST. OR REHAB. LENGTH(Miles/km): .20/.32180 MANAGER: BILL MOSKAL COUNTY SIGNED 9/2/88 FOR UTILITIES
ATLANTA TIP t DK-R 035
CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 27
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE $
0
CONST NONE $
0
PE LOCL
ROW NONE
$
0
CONST 1996 $ 870
FED SHARE $
696
GA. SHARE $
0TH SHARE $
174
PE 1992 ROW LOCL
CONST
UNDERWAY AFTER 98
DEKALB 712870
STATUS:
I-20@ LITHONIA INDUSTRIAL BLVD
ATLANTA TIP# DK-R 059
INTERCHANGE/ NEW CONSTRUCTION
CONG DIST. 11
LENGTH(Miles/km): 3.50/5.63150 - EXIST. LANES: 0 /PROPOSED LANES: 4
MANAGER: G. ROSS
FUND SOURCE: DEMONSTRATION PROGRAM
REQ CO DO UTIL 7-21-94; OTHER SHARE IS UNFUNDED
FEDERAL HIGHWAY ADMIN"FUNDS
PE 1993 UNDERWAY ROW 1996 $ 16238 CONST 1996 $ 24675
FED SHARE $ 8437
GA. SHARE $
0TH SHARE $ I6238
DEKALB
713040
STATUS:
I-20 BARRIER WALLS@ CLOSE FRONTAGE RDS/ & ROCKDALE, NEWTON
ATLANTA TIP f DK-R 181
WALLS/ MAINTENANCE
CONG DIST. 4 & 11
LENGTH(Miles/km): 18.70/30.08830 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN
FUND SOURCE: I-STATE MAINT.
REQ DEKALB, ROCKDALE & NEWTON DO UTILITIES 9-21-94
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW NONE CONST
$
30
$
0
AFTER 98
DEKALB 71315X
STATUS:
COMMUNICATION CABLE ON I-20 FM CAPITOL AVE TO I-285; FULTON UNKNOWN/ UNKNOWN LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: SAM ZEIGLER
ATLANTA TIP# R 202 CONG DIST. 0 & 0
0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
713157 IS AN ASSOCIATED PROJECT.
DEKALB 713220
STATUS:
I-20@ WESLEY CHAPEL RD RELOC FRONTAGE RO (SNAPFINGER WOOD) INTERCHANGE/ RECST. OR REHAB. LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 2 /PROPOSED LANES:
MANAGER: A. ALEXANDER
ATLANTA TIP# DK-R 182 CONG DIST. 11
2 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE 1995 ROW 1998 CONST
UNDERWAY $ 1000 AFTER 98
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DEKALB 713250
STATUS:
I-285 SOUTH AUXILLARY LN FM SR 8 TO STN MTN FWY & FWY BRIDGE
ATLANTA TIP.# DK-R 183 .
INTERCHANGE/ RECST .. OR REHAB.
CONG DIST; 4 & 11
LENGTH(Miles/km): 1.00/1.60900 - EXIST; LANES: 4 ' /PROPOSED LANES: 5
MANAGER: BILL MOSKAL
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
713320 IS AN ASSOCIATED PROJECT.
DEKALB 713320
STATUS:
I-285@ SR 8/US 29/LAWRENCEVILLE HWY INTERCHANGE/ RECST. OR REHAB. LENGTH (Miles/km): . 70/1.12630 - EXIST". MANAGER: BILL MOSKAL REQ DEKALB DO UTILITIES 11-16-94.
LANES:
o /PROPOsiD
LANES:
ATLANTA .TIP~# DK-R 184 CONG DIST. 4 0 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 713250 IS AN ASSOCIATED PROJECT.
DEKALB
71340X
STATUS:'
I-285 CABLING. SEE 713400 IN FULTON CO, -713400 UNKNOWN/ UNKNOWN LENGTH (Miles/km): .. 00/. 00000, - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: UNKNOWN
ATLANTA TIP f R 200
CONG DIST. 0 & 0
0 FUND SOURCE: CONG MIT;/AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS 713400 IS AN ASSOCIATED PROJECT.
DEKALB 71351X
STATUS:
I-285&!-75, 85 WITHIN-TO REPL UNKNOWN/ UNKNOWN LENGTH (Miles/km) : .00/ .00000
MANAGER: UNKNOWN
SIGNS WITH HI-INTENSITY BACK EXIST. LANES: 0 /PROPOSED LANES:
ATLANTA TIP:# *LUMP SUM CONG DIST. 5 & 11
0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS 713510 IS AN ASSOCIATED PROJECT.
DEKALB
721050
,SR 124@ STONE MOUNTAIN CRK REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH (Miles/km) : . 50/. 80450 MANAGER: D..GODWIN
SGN GWINNETT CO 2-19-_87 & DEKALB 9-10-86 FOR UTILITIES
ATLANTA TIP f DK' 099
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS 721535 IS AN ASSOCIATED PROJECT.
DEKALB 721055
STATUS:
SR 124@ YELLOW RIVER/ ALSO GWINNETT CO REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 ~ANES. LENGTH (Miles/km) : . 03/. 04 827 MANAGER: RAY METTS COUNTY SIGNED. 9/10/86 FOR UTILITIES (SEE. #721050)
ATLANTA TIP# DK 100' CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72105X IS AN ASSOCIATED PROJECT.
DEKALB 721330
STATUS:
SR 124/ROCK CHAPEL RD FM UNION GR RD N TO PLEASANT HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .90/1.44810 MANAGER: D.' GODWIN DEKALB SGN 9-2-88 FOR UTILITIES.
ATLANTA TIP f DK 084 CONG DIST. 4
FUND SOURCE: NAT 1 L HIGHWAY FEDERAL HIGHWAY ADMIN-FUNDS
21-Sep-1995 Page 28
FISCAL YEAR
COST , ESTS
PE 1995 ROW 1998 CONST
UNDERWAY $ 1000 AFTER 98
PE 1995 ROW 1998 CONST
UNDERWAY
$
100
AFTER 98
PE NONE
$
0
ROW NONE
$ .
0
CONS? NONE, $
0
PE NONE
$
ROW NONE
$
.0o.
CONST NONE
$
0
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1998
$
455' .
FED SHARE $
364
GA. SHARE $
91
0TH SHARE $
PE 1992 ROW 1998 CONST
UNDERWAY
$
s
AFTER 98
PE 1993
UNDERWAY
ROW 1996 $ 1481
CONST 1998
$ 1501
FED SHARE $ 1201 .
GA. SHARE $
300
0TH SHARE $
1!!!1!111
1!1!!!11 11!!!!!1!!1 l!l!!!!!!!l l!i!!!!!I!!! I!!!!!!! !li!!!!!!!!I I!!!'!!!! I!!!!!!!! !!!!!!!II !l!!!!!!!I l!!!!\!!!J!I
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DEKALB 721350
STATUS;
SR 12/COVINGTON HWY FM SR 124 E TO TURNER HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 1.20/1.93080
MANAGER: D. CHURCH COUNTY SIGNED 9-2-88 FOR UTILITIES
ATLANTA TIP f DK 030
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 29
FISCAL YEAR
COST ESTS
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
DEKALB 721380
STATUS!
SR 857/ROCKBRIDGE RD FM SR 10/MEMORIAL DRE TO HAIRSTON RD
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 2.20/3.53980
MANAGER: M. REYNOLDS DEKALB SGN 3-5-90-UTIL & ASSUME MAINT WHEN CST COMPLETED.
DEKALB 721390
STATUS:
SR 857/ROCKBRIDGE RD FM HAIRSTON RD TO ST MTN-LITHONIA RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1.90/3.05710 MANAGER: M, REYNOLDS DEKALB SGN 3-5-90-UTIL & ASSUME MAINT WHEN CST COMPLETED.
DEKALB 721400
STATUS:
ASHFORD-DUNWOODY/JOHNSON FERRY FM PTREE IND BLVD TO 1-285 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.54/4:08686
MANAGER: G. ROSS REQ DEKALB DO ROW & UTILITIES 6-2-88
DEKALB 721405
STATUS:
ASHFORD-DUNWOODY RD@ NANCY CRK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. LENGTH(Miles/km): .02/.03218 MANAGER: G, ROSS REQ DEKALB DO ROW & UTILITIES 6-2-88
DEKALB 721530
STATUS:
SR 124 FM ROCKBRIDGE RD TO CENTERVILLE-ROSEBUD RD/GWINNETT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
LENGTH(Miles/km): 4.10/6,59690 MANAGER: RAY METTS REQ DEKALB DO UTIL 2-4-91;GWINNETT SGN 1-8-92 PUB UTIL
DEKALB 721535
STATUS:
SR 124 FM PLEASANT HILL RD TO ROCKBRIDGE RD/ INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.10/4.98790 MANAGER: D, GODWIN REQ DEKALB- CO DO UTILITIES 10-30-91
ATLANTA TIP f DK 025
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 751320 IS AN ASSOCIATED PROJECT.
ATLANTA TIP# DK 025 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 751320 IS AN ASSOCIATED PROJECT,
ATLANTA TIP# DK 022 CONG DIST. 4 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721405 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 022
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721400 IS AN ASSOCIATED PROJECT.
ATLANTA TIP# GW 076 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 72153X rs AN ASSOCIATED PROJECT.
ATLANTA TIP # DK 085 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 721050 IS AN ASSOCIATED PROJECT.
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 98
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 98
PE 1992 ROW 1997 CONST
UNDERWAY $ 10704 AFTER 98
PE 1993
UNDERWAY
ROW 1996
$ 2327
CONST 1998
$ 4959
FED SHARE $ 3967
GA. SHARE $
992
0TH SHARE $
-- -----------------7
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
f;EGIONAL DEVELOPMEN'J' ~OMMISSION
COMMENTS
DEKALB 730970
STATUS:
SR 212/BROWNS MILL RD @.POLE BRIDGE CRK
REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. LENGTH(Miles/km): .40/,64360 MANAGER: D. GODWIN REQ DEKALB COUNTY DO UTILITIES 5-10-91
ATLANTA TIP f DK 098
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL .HIGHWAY AOMIN FUNDS
21-Sep-1995 Page 30
FISCAL
YEAR
COST
ESTS
PE 1993
UNDERWAY
' - ROW 1996
$
10
CONST 1996
$
498
FED SHARE $
398
GA. SHARE $
100
0TH SHARE $
DEKALB 751270.
STATUS:
REDAN RD@ SNAPFINGER,CRK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): .10/.16090 MANAGER: BILL MOSKAL COUNTY ~EQUESTED TO DO ROW AND UTILITIES 6-2-88
ATLANTA TIP f DK 023.
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS 751230 IS AN ASSOCIATED PROJECT,_
PE 1992 ROW LOCL CONST
UNDERWAY AFTER. 98
DEKALB 751320
STATUS:
CR 5189/ROCKBRIDGE RD@ SNAPFINGER CREEK
REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
LENGTH(Miles/km): ,28/,45052
MANAGER: M. REYNOLDS
1
SIGNED BY DEKALB couNTY 12-5-86 FOR R/W & UTILITIES
ATLANTA TIP .ft DK 101 ,. CONG DIST. 4
FUND. SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721390 IS AN ASSOCIATED PROJECT ..
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 98
DEKALB 751370
STATUS:
CHAMBLEE-TUCKER RD FM NEW P1 TREE RD TO BUFORD HWY/SR 13
RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. LENGTH(Miles/km): 1.40/2.25260 MANAGER: D. GODWIN DEKALB SGN FOR UTILITIES 4-25-94
ATLANTA TIP# DK 001CONG DIST. 4
FUND SOURCE: I-STATE-CONST. FEDERAL HIGHWAY AOMIN FUNDS
PE 1993
UNDERWAY
ROW 1995
UNDERWAY
CONST 1996 $ 2000
FED SHARE $ 1700
GA, SHARE $
300
0TH SHARE $
DEKALB WINTERS CHAPEL RD FM OAKCLIFF RD TON/CHICOPEE RD(& SIGNAL) 751440 . CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED,
LENGTH(Miles/km): .79/1.27111 MANAGER: G. ROSS STATUS: DEKALB SGN 6-30-89 ROW & UTIL & 25% SIGNAL COST (T&S PROJECT
ATLANTA TIP# DK 044 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 751445
STATUS:.
WINTERS CHAPEL-OAKCLIFF RD CONN@ SOUTHERN RR BRIDGES/ RECST, OR REHAB. LENGTH(Miles/km): ,08/.12872 MANAGER: G, ROSS CO SIGNED 6/30/89. ROW & UTILITIES., SEE PI #751440
ATLANTA TIP f DK 094
CONG DIST, 4
FUND SOURCE: HWY', SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW LOCL
CONST 1996 $ 6657
FED SHARE$ 5326
GA. SHARE$
696
0TH SHARE$
635
PE 1992
UNDERWAY
ROW NONE
$
0
CONST i996
$ 2253
FED SHARE $ 2028
GA. SHARE $
225
0TH SHARE $
DEKALB SR 859/COOLEDGE-BROCKETT RD FM STONE MTN FWY-SR 8/W SIGNALS 751495 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH (Miles/km) : 1. 0_0/1. 60900 MANAGER: D, GODWIN STATUS: SEE STP-9223 (3), PI #751"490
ATLANTA TIP f DK 079 CONG DIST, 4 & 11
FUND SOURCE: SURFACE TRANSPORT, _ FEDERAL HIGHWAY ADM IN FUNDS
PE 1997 ROW CONST
$
42
AFTER 98
AFTER 98
111!1!1!11
COUNTY P. I.NO.
l!!l!!!!!!l
-
DESCRIPTION PROJECT DATA
!!!!!!I l!!l!!!!l l!!!!!!!li!I
!!!!!!!!!I !!!!!!I
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DEKALB 752100
STATUS:
EAST PONCE DE LEON AT RAYS ROAD INTERSECTION IMPROVEMENT/ RECST. OR REHAB. LENGTH(Miles/km): .40/.64360 - EXIpT. LANES: 2 /PROPOSED LANES: MANAGER: D. GODWIN COUNTY SGN CONTRACT FOR PE, ROW & UTILITIES 7-14-94
ATLANTA TIP f DK 102
CONG DIST, 4 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 31
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW LOCL
CONST 1996
$
514
FED SHARE $
463
GA. SHARE $
51
0TH SHARE $
DEKALB 752500
STATUS:
SR 260/GLENWOOD RD FM IRIS LANE TO COREY BLVD. SIDEWALKS/ SAFETY LENGTH(Mileo/km): .33/.53097 - EXIST. LANES: 0 MANAGER: D. GODWIN NOT APPLICABLE
/PROPOSED
LANES:
ATLANTA TIP# DK 122 CONG DIST. 11 0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
$
5
ROW 1996
$
10
CONST 1997
$
30
FED SHARE $
27
GA. SHARE $
3
0TH SHARE $
DEKALB 770397
STATUS:
NON-FREEWAY COMMUNICATIONS FIBER OPTIC CABLE MISCELLANEOUS IMPROVEMENTS/ SAFETY
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: MANAGER: SAM ZEIGLER OTO WILL NOTIFY
IN DEKALB CO. 0 /PROPOSED LANES:
ATLANTA TIP i R 098 CONG DIST, 4 & 11
0
FUND SOURCE: DEMONSTRATION PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
PE 1995
UNDERWAY
ROW NONE
$
0
CONST 1996
$
560
FED SHARE $
448
GA, SHARE $
112
0TH SHARE $
DEKALB 770480
STATUS:
SOUTH DECATUR TROLLY LINE CONVERSION
ATLANTA TIP# DK 116
BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST. 5 & 4
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: STEVE YOST
FUND SOURCE: TRANS, ENHANCE,
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996
$
625
FED SHARE $
500
GA. SHARE $
0TH SHARE $
125
DEKALB MARTA DEMAND RESPONSIVE PROJECT; SEE FULTON- 770633 77063W UNKNOWN/ UNKNOWN
ATLANTA TIP f M-R 161 CONG DIST, 0 & 0
PE NONE
$
0
ROW NONE
$
0
LENGTH(Miles/km): .oo/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: UNKNOWN
FUND SOURCE: CONG MIT,/AIR QUAL
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
770633 IS AN ASSOCIATED PROJECT,
DEKALB 770692
STATUS:
NON FREEWAY SURVEILLANCE.SYSTEM IN DEKALB COUNTY MISCELLANEOUS IMPROVEMENTS/ SAFETY LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED MANAGER: SAM ZEIGLER LGPA NOT APPLICABLE
LANES:
ATLANTA TIP# R 190 CONG DIST. 4 & 11 0
FUND SOURCE: CONG MIT,/AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 770840
STATUS:
SR 8@ DEKALB IND WAY,SCOTTDALE; N DECATUR RD@ SCOTTDALE RD
INTERSECTION IMPROVEMENT/ SAFETY LENGTH(Miles/km): .12/.19308 - EXIST. LANES: 0 /PROPOSED LANES:
MANAGER: D. GODWIN DEKALB SGN FOR ROW & UTILITIES 8-23-94
ATLANTA TIP i DK 123
CONG DIST. 4
0 FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST 1996
$
481
FED SHARE $
385
GA. SHARE $
96
0TH SHARE $
PE 1996
$
5
ROW NONE
$
0
CONST 1997
$
110
FED SHARE $
99
GA. SHARE $
11
0TH SHARE $
COUNTY P.I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DEKALB 770860
.'STATUS:
INSTALL TRAFFIC SIGNALS AT.52: INTERSECTION IN DEKALB COUNTY SIGNALS/ SAFETY LENGTH(Miles/km).: .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: BURT.RID~LE
ATLANTA TIP f DK 124 CONG DIST. 4 & 11
0 FUND SOURCE: HWY, SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 77087X
S'J'.ATUS:
ARTERIAL ROUTES IN ATLANTA-INSTALL COMM. CABLE, HND UNKNOWN/ UNKNOWN LENGTH (Miles/km): 00/. 00000 - EXIST. LANES: 0 /PROPOSED
MANAGER: SAM ZEIGLER
LANES:
ATLANTA TIP# R 201 CONG DIST. 5 & 4
0 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS 770872 IS AN ASSOCI~TED PROJECT.
DEKALB 770910
STATUS:
SIDEWALKS AT KENSINGTON RD, COVINGTON HWY & MEMORIAL DRIVE
ATLANTA TIP f R 165
SIDEWALKS/ NEW CONSTRUCTION
: -CONG DIST. 11 & 4
LENGTH (Miles/km), 1. 79/2. 88011 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 770911
STATUS:
SIDEWALKS AT BUFORD HWY, NEW PEACHTREE RD, & SHALLOWFORD RD.
ATLANTA.TIP# R 165
SIDEWALKS/ NEW CONSTRUCTION
CONG DIST. 4
LENGTH (Miles/km): 3. 99/6. 41991 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 770912
SIDEWALKS AT BRIARWOOD ROAD & DRESDEN ROAD
ATLANTA TIP i R 165
SIDEWALKS/ NEW CONSTRUCTION
CONG DIST. 4
LENGTH(Miles/km): 1;21/1.94689 - EXIST.LANES: 0 /PROPOSED-LANES: 0
MANAGER: . UNKNOWN
'
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE _BY CONTRACT.,,
' r
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 770913
STATUS:
.SIDEWALKS AT NEW PEACHTREE, PEACHTREE RDS. & PEACHTREE INDUS
ATLANTA TIP-# R 165
SIDEWALKS / NEW CONSTRUCTION
,\ .
. 7
CONG DIST. 4
LENGTH (Miles/km) : 2. 69/ 4 32821 - EXIST..LANES": 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: CONG MIT./AIR QUAL
TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
-T ,
21-Sep-1995
Page 32
FISCAL YEAR
COST ESTS
PE NONE $
.0
ROW LOCL
CONST 1996
$
350
FED SHARE $
315
GA. SHARE $
35
0TH SHARE $
PE NONE $
0
ROW NONE $
0
CONST NONE
$
0
PE 1996
UNDERWAY
ROW NONE
$
0
CONST 1996
$
142
FED SHARE $
114
GA. SHARE $
0TH SHARE $
28
PE 1996. UNDERWAY
ROW NONE
$
0
CONST 1996
$
316
FED SHARE $
253
GA. SHARE $
0TH SHARE $
63
PE 1996
UNDERWAY
ROW NONE
$
0
CONST 1996
$
96;
FED SHARE$
77
GA. SHARE$
0TH SHARE$
19
PE 1996 UNDERWAY
ROW NONE . $
0
CONST 1996
$
213
FED SHARE $
170
GA. SHARE $
0TH SHARE $
43
11!1!!!1!!! I!!!!!!!!!!
11!!!!!1!!1 l!!!!'!!!!!!!l
!!!I!!!!!!! I!!!!!!!!!! l!!!!!!!!!I !!!!!l!l l!!!!!!!!!I
1!!!!18
GEORGIA DEPARTMENT OF TRANSPORTATION
21-Sep-1995
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 33
PROJECT LISTING BY RDC FY 1996/FY 1998
-CP-O-.IU-.NN-T-OY-,----------------DP-RE-OS-CJ-ER-C-ITP-T-ID-OA-NT-A---------R-AE-GR-CI-O-N-A-L--D-E-V-E-L-O-P-M-E-N-T--C-O-M--M-I-S-SI-O-N-------C-O-M-M--EN-T-S--------------------------F-IY-SE-CA-AR-L--------CE-OS-TS-TS--
DOUGLAS COUNTY OPERATED PUBLIC TRANSIT SERVICE
7B1395 STATUS:
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH
CONG DIST. 7
OPERATING 1996
$
68
FUND SOURCE: RURAL TRANSIT
FED SHARE $
54
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
14
DOUGLAS 7B8023
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH
CONG DIST, 7
OPERATING 1997 $
71
FUND SOURCE: RURAL TRANSIT
FED SHARE $
56
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
15
DOUGLAS 7D7033
STATUS:
CAPITAL IMPROVEMENT - MULTI-USE FACILITY I-20 AT CHAPEL 'HILL
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH ROAD (PARK/RIDE, VANPOOL, BUS)
CONG DIST, 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$
719
FED SHARE$
575
GA. SHARE$
72
0TH SHARE$
72
DOUGLAS 7D7516
STATUS:
CAPITAL IMPROVEMENT - TRANSIT PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY
MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$
150
FED SHARE $
120
GA. SHARE $
15
0TH SHARE $
15
DOUGLAS 7D7528
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1997 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH
CONG DIST. 7
OPERATING 1997 $
58
FUND SOURCE: URBAN TRANSIT
FED SHARE $
29
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
29
DOUGLAS 7D7529
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1998 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: DOUGLAS COUNTY
MANAGER: STEVE KISH
CONG DIST. 7
OPERATING 1998
$
58
FUND SOURCE: URBAN TRANSIT
FED SHARE.$
29
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
29
DOUGLAS 7D7530
STATUS:
CAPITAL IMPROVEMENT - TRANSIT PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY
MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$ 150
FED SHARE$
120
GA. SHARE$
15
0TH SHARE$
15
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
.GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
2l"Sep-1995 Page 34
FISCAL YEAR.
COST ESTS
DOUGLAS 7Vl021
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1996
$
30
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
DOUGLAS. 7V7012
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY MANAGER: STEVE KISH
DOUGLAS ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 7V7026 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT:AGENCIES IN DOUGLAS COUNTY
MANAGER: STEVE KISH STATUS:
CONG DIST. 7
CAPITAL 1997
$
30
FUND souRCE: ELDERLY 0 & DISABLED FUND
FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
'\.Ti
. ,
CONG DIST. 7
CAPITAL 1998
$
30
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
DOUGLAS: SR 92 BRIDGE & APPROACHES OVER I-20 IN DOUGLASVILLE
712930 INTERCHANGE/ RECST. OR REHAB.
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 4 /PROPOSED LANES:
MANAGER: KEVIN HOSEY
.
STATUS: REQ CITY DO UTIL 7-20-'92; DOUGLAS CO SGN 8-18-92 PUB UTIL.
ATLANTA.TIP f DO-R 208
CONG oisT. 7
7 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71Y930 IS AN ASSOCIATED PROJECT.
sR DOUGLAS I-20@
61 CONN INTERCHANGE RECONSTRUCTION; & 71Y490
713490 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED.
LENGTH(Miles/km): .00/.00000
MANAGER: J. GRAYBEAL
.
. ,
STATUS: RESUB TO CO DO ROW & UTIL 3-10-95; CITY SGN 2'-28-95. ROW/UTIL
ATLANTA TIP f DO 017
CONG DIST. 7
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW CONST
$
30
AFTER 98
AFTER 98
PE 1995
UNDERWAY.
ROW LOCL
CONST 1997
$
900
FED SHARE $
720
GA. SHARE $
180
0TH SHARE $
DOUGLAS 71Y490
STATUS:
I-20@ SR 61 CONN INTERCHANGE RECONSTRUCTION; SEE 713490 INTERCHANGE/ RECST. OR REHAB. LENGTH.(Miles/km) : ..00/. 00000 - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: UNKNOWN SEE PI #713490
ATLANTA TIP f DO 017 , . CONG DIST. 7
0
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0
1200 960 240
DOUGLAS 'BANKHEAD HWY FM SWEETWATER RD E TO THORNTON RD 721320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 1.10/1.76990
MANAGER: 0. sMIT,H STATUS:
ATLANTA TIP # DO 016. CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL-HIGHWAY ADMIN FUNDS
. '
pE 1992 ROW i.998 'CONST
UNDERWAY
$ 1595 AFTER 98
11!!!!!!!!1 I!!!!!!!!!!! I!!!!!!!!!!! I!!!!!!!!! I'!!!!!!!!!
ll!!!!!!l!I l!!!!!!l!!!l II!!!!!!!! I!!!!!!!! !!!"-!B u . !!1:1
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
.
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
DOUGLAS 721420
STATUS:
SR 92 FM S/SR 166 NE TO LAKE MONROE RO/CR 140 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
LENGTH(Miles/km): 2.26/3.63634 MANAGER: KEVIN HOSEY DOUGLAS SIGNED FOR UTILITIES 5-2-95
ATLANTA TIP i DO 028
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
1 .::.]
21-Sep-1995 Page 35
FISCAL YEAR
COST ESTS
PE 1992 ROW 1997 CONST
UNDERWAY $ 2191 AFTER 98
DOUGLAS 721590
STATUS:
SR 5&8/US 78/BANKHEAD HWY FM SR 92 E TO CR 15/SWEETWATER RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 5.88/9,46092 MANAGER: D, SMITH
ATLANTA TIP# DO 029 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS'
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
DOUGLAS 721770
STATUS:
SR 166 FM OLD LOWER RIVER RD/DOUGLAS TO SR 70/FULTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.91/4.68219 MANAGER: J, GARLAND
ATLANTA TIP f DO 019 CONG DIST. 7
FUND SOURCE: "SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
ROW CONST
UNDERWAY AFTER 98 AFTER 98
DOUGLAS 751820
STATUS:
DOUGLAS BLVD EXT FM CR 814 TO CR 115 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. LENGTH(Miles/km): 1.80/2.89620 MANAGER: J. GARLAND
ATLANTA TIP# DO 032 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
103
AFTER 98
DOUGLAS 751825
STATUS:
DOUGLAS BLVD EXT FM CR 142 TO CR 814 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED,
LENGTH(Miles/km): 2.00/3.21800 MANAGER: J. GARLAND
ATLANTA TIP# DO 031 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1997 ROW LOCL CONST
$
103
AFTER 98
DOUGLAS 762385
STATUS:
61 CONN FM I-20 TON OF NS RR BRIDGE & 76Y385 FOR BR
CONSTRUCTION OF NEW ROUTE WITH 9 LANES PROPOSED.
LENGTH(Miles/km): .00/.00000
MANAGER: J. GRAYBEAL RESUB TO CO DO ROW & UTIL 3-10-95; CITY SGN 2-28-95 ROW/UTIL
DOUGLAS 76Y385
STATUS:
SR 61 CONN NORFORK-SOUTHERN RR BRIDGE; SEE 762385
BRIDGES/ NEW CONSTRUCTION LENGTH(Miles/km): .00/.00000 MANAGER: UNKNOWN SEE PI #762385
ATLANTA TIP# DO 017 CONG DIST. 7
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS 76Y385 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DO 017
CONG DIST. 7
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS 762385 IS AN ASSOCIATED PROJECT.
PE 1.995 ROW LOCL CONST
UNDERWAY AFTER 98
PE NONE
$
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0
1200 960 240
GEORGIA DEPARTMENT OF TRANSPORTATION
21-Sep-1995
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 36
PROJECT LISTING BY RDC FY 1996/FY 1998
COUNTY
DESCRIPTION
ARC
FISCAL
COST
D-P-O-U,I-G,-NLA-O-S-. -C-R---3-9-/0-L-D---A-LA-B-AP-MR-A-O-JE-RC-D-T@--D-AS-WT-AE-E-TW~AT-E-R--RC-RE-KG-I-O-N-A-L--D-E-V-E-L-O-P-M-E-N-T--C--O-M-M--IS-S-IO-N--AT-L-A-N-T-AC-O-MT-MI-P-ENfTS-D-O-. --03-9-----------------
YEAR
ESTS
------------------.-
, PE 1992
UNDERWAY
770162 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
CONG DIST, 7
ROW LOCL
LENGTH(Miles/km): .20/,32180
CONST 1996 '$
681
MANAGER: D, GODWIN
.
FUND SOU-RCE: BRIDGE' PROGRAM
FED SHARE$
545
STATUS: DOUGLAS COUNTY SGN DO ROW, UTIL & DETOURS 7-2~91.
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
136
0TH SHARE$
DOUGLAS 770975
STATf:1S:
T: T
BICYCLE/PEDESTRIAN FAC'S FOR SIGNAGE, RACKS & STRIPING
BICYCLE/PED. FACILITY/ ENHANCEMENT
LENGTH(Miles/km): .00/.00000 - EXIST, LANES: 0 /PROPOSED
MANAGER: UNKNOWN ' '
~
, ~'
TO BE DONE BY CONTRACT
LANES:
ATLANTA TIP f R 177
CONG DIST, 7
o
1 ~
,
FUND SOURCE: CONG MIT./AIR QUAL
FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
UNDERWAY
ROW NONE
$
0
CONST 1997
$
31
FED SHARE $
25
GA. SHARE $
0TH SHARE $
6
DOUGLAS 770976
STATUS:
BICYCLE/PEDESTRIAN SIGNS, RACKS, STRIPING@ LITHIA SPGS
BICYCLE/PED. FACILITY/ ENHANCEMENT
LENGTH (Mi'les/km): . oo/. 00000 - EXIST, LANES: ,0 ./PROPOSED LANES:
MANAGER : UNKNOWN
.
TO BE DONE BY CONTRACT
ATLANTA TIP f'R 177 CONG DIST. 7
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW NONE
UNDERWAY
$
,,a
CONST 1997
$
5
FED SHARE $
4
GA. SHARE $
0TH SHARE $
l
l!!!l!l!!!I !!!!!!!!II l!!!!l!!!I I!!!!!!!!! ll!!!!!!l!!I I!!!!!!!!!
l!!!!!!!!!!!I llJ!1!!!!ll !i!!i'l!!il
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
21-Sep-1995 Page 37
FISCAL YEAR
COST ESTS
FAYETTE 3Vl024
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH
CONG DIST. 3
CAPITAL 1996
$
30
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
FAYETTE 3V7013
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH
CONG DIST. 3
CAPITAL 1997
$
30
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
FAYETTE 3V7024
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH
CONG DIST. 3
CAPITAL 1998
$
30
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
FAYETTE 321950
STATUS:
SR 92 S/FAYETTEVILLE FM MCBRIDE RD/INMAN TO J MAYFIELD DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.38/5.43842 MANAGER: M. REYNOLDS COUNTY REFUSED 7/9l;CITY SGN 10/92 FOR PUB UTILITIES ONLY
ATLANTA TIP# FY 003 CONG DIST, 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY
AFTER 98 AFTER 98
FAYETTE 321960
STATUS:
SR 85 S/FAYETTEVILLE FM S/BERNHARD RD TO OLD SR 92/F'VILLE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES, LENGTH(Miles/km): 4.58/7.36922
MANAGER: M. REYNOLDS REQ FAYETTEVILLE DO UTIL 12-30-91; COUNTY REFUSED 1-21-92
ATLANTA TIP f FY 006 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
FAYETTE 321964
STATUS:
SR 85 FM SR 74 N TO BERNHARD RD/CR 126 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 3.30/5.30970 MANAGER: M, REYNOLDS
FAYETTE REFUSED TO DO UTILITIES 2-17-93
FAYETTE 321966
STATUS:
SR 85@ WHITEWATER CREEK REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES,
LENGTH(Miles/km): .00/.00000 MANAGER: M. REYNOLDS FAYETTE REFUSED TO DO UTILITIES 2-17-93 (SEE PI #321964)
ATLANTA TIP f FY 005 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 321966 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f FY 013
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 321964 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1998 CONST
PE 1992 ROW NONE CONST
UNDERWAY $ 1796 AFTER 98
UNDERWAY
$
0
AFTER 98
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY RDC FY 1996/FY 1998
ARC REGIONAL DEVELOPMENT COMMISSION - COMMENTS
FAYETTE 322065
STATUS,
SR 54@ SCL RR REPLACEMENT OF 0 THE EXISTING BRIDGES(S). NO ADDED LANES, LENGTH(Miles/krn), . 01/. 01609
MANAGER, M. REYNOLDS P'TREE CITY SGN 8-5-93 UTIL; NO COUNTY UTILITIES INVOLVED
ATLANTA TIP# FY 012 CONG DIST. 3
FUND SOURCE, BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322060 IS AN ASSOCIATED PROJECT.
FAYETTE 32206X
STATUS,
SR 34/54 FM FISCHER CROSS RDS TO-SR 74 ... SEE COWETA CO UNKNOWN / UNKNOWN _ LENGTH(Miles/krn), . 00/. 00000 -- EXIST. LANES, ,0 /PROPOSED LANES, MANAGER, M. REYNOLDS
ATLANTA TIP# cu cow co
CONG DIST. 0 & 0
0
FUND SOURCE, SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 322060 IS AN ASSOCIATED PROJECT.
FAYETTE SR 54 @ LINE CREEK/SEE' COWETA co- 322063 .
ATLANTA
0
TIP #
cu
cow co
32206Y UNKNOWN/ UNKNOWN
CONG DIST. 0 & 0
LENGTH(Miles/krn), .00/ .00000 - EXIST. LANES, 0 /PROPOSED LANES, 0
MANAGER, M. REYNOLDS
FUND SOURCE, BRIDGE PROGRAM
STATUS,
FEDERAL HIGHWAY ADMIN FUNDS
322063 IS AN ASSOCIATED PROJECT.
FAYETTE 322350
STATUS,'
SR 74 FM CROSSTOWN RD/TDK .BLVD NW TO SR 54
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/krn), 2 .15/3. 45935..
,
MANAGER, M. REYNOLDS
-
ATLANTA TIP# FY 009 ~ CONG DIST. 3
FUND SOURCE": SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 38
FISCAL YEAR
COST ESTS
PE 1992
ROW NONE CONST
UNDERWAY
$
0
AFTER 98
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE NONE
$
0
ROW NONE
$
0
CONST NONE $.
0.
PE 1992 ROW 1998 CONST
UNDERWAY $ 3600_
AFTER 98 -
FAYETTE' SR 74 FM SR 85 NW TO CROSSTOWN RD/TDK BLVD
322355 RECONSTRUCTION & WIDENING FROM 2 LANES _TO 4 LANES. LENGTH(Miles/krn), 4.91/7.90019 MANAGER, M. REYNOLDS ' -
STATUS,
FAYETTE SR 74@ FLAT CREEK 322357 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
LENGTH (Miles/km), . 25/. 40225 MANAGER, M. REYNOLDS STATUS, LGPA TO BE SENT W/FR-164-1(36) #322340 & FR-209-1(2) @322355
ATLANTA TIP # FY 009.' ' CONG DIST.__ 3
FUND SOURCE, SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
.. 322357 IS AN ASSOCIATED PROJECT. [, ~
ATLANTA TIP"# FY 015
CONG
D'
I .
S. T
.
. 3
FUND SOURCE, BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322355 IS AN ASSOCIATED PROJECT.
FAYETTE 322650
STATUS,
SR 74 AT PASCHALL ROAD IN PEACHTREE CITY
INTERSECTION IMPROVEMENT/ SAFETY
.
LENGTH(Miles/krn), .40/ .64360 - EXIST. LANES, 2 /PROPOSED LANES,
MANAGER, GORDON BROWN
PEACHTREE CITY SIGNED FOR Row & UTILITIES 2-16-95
ATLANTA TIP # FY '009 ..
CONG DIST . 3
2
FUND SOURCE, HWy, SAFETY_ FEDERAL.HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
PE -1995
ROW NONE CONST
UNDERWAY
$
0
AFTER 98
PE 1994 UNDERWAY
ROW LOCL
CONST 1997
$
145
FED SHARE$ - 131'"
GA, SHARE$
15
0TH .SHARE$
ll!!!!!!!!!!I l!!!!i!!l1 l!!ll!!!li llJM!!I
i!ii!!!!!i ~
eel ~!!~
COUNTY P.I,NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
FAYETTE 322 670
STATUS:
SR 74 @ 7 INTERSECTIONS BETWEEN SENOIA RD & MILAM RD/FULTON
ATLANTA TIP I FY 019
ACCELERATION/DECEL LANE/ SAFETY
CONG DIST. 3
LENGTH(Miles/km): 2.60/4.18340 - EXIST. LANES: 4 /PROPOSED LANES: 5
MANAGER: GORDON BROWN
FUND SOURCE: NAT'L HIGHWAY
REVISED 5-25-94 - REQ FAYETTE & FULTON DO ROW & UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
FAYETTE 331930
STATUS:
SR 85 CONN FM CR 168 TO SR 85; PPL FM 4.0 TO 6.0 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED, LENGTH(Miles/km): 3.90/6.27510 MANAGER: K. FULBRIGHT
REQ BROOKS DO UTILITIES 5-3-93; FAYETTE SGN 6-2-93 UTILITIES
ATLANTA TIP f FY 001
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
1 :,j
21-Sep-1995 Page 39
FISCAL YEAR
COST ESTS
PE NONE
$
ROW LOCL
CONST 1996
$
FED SHARE $
GA. SHARE$
0TH SHARE$
0
763 763
PE 1993 ROW 1997 CONST
UNDERWAY $ 2950 AFTER 98
FAYETTE SR 54@ MORNING & CAMP CRKS; FLINT RIVER/SEE CLAYTON CO 72104X UNKNOWN/ UNKNOWN
ATLANTA TIP f CL23/FY2
CONG DIST. 0 & 0
PE NONE
$
0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M. REYNOLDS
FUND SOURCE: BRIDGE PROGRAM
CONST NONE
$
0
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
721040 IS AN ASSOCIATED PROJECT. ' ' I
FAYETTE SR 85 FM.SR 279/FAYETTE TO ROBERTS DR/CLAYTON- 721290
ATLANTA TIP# CL15/FY4
PE NONE
$
0
I
72129X UNKNOWN/ UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 - EXIST, LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: K. FULBRIGHT
FUND SOURCE: SURFACE TRANSPORT.
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS 721290 IS AN ASSOCIATED PROJECT.
FAYETTE SR 85 NBL@ CAMP CREEK/SEE CLAYTON COUNTY- 721295
ATLANTA TIP i CL 077
PE NONE
$
0
72129Y UNKNOWN/ UNKNOWN
CONG DIST. 0 & 0
ROW NONE
$
0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: K. FULBRIGHT
FUND SOURCE: BRIDGE PROGRAM
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
721295 IS AN ASSOCIATED PROJECT.
FAYETTE 721440
STATUS:
SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 ... & CLAYTON CO
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 5.30/8.52770 MANAGER: M. REYNOLDS CLAYTON SGN 4/95 & WANTS COST EST; FAYETTE SGN $75K 6/95
ATLANTA TIP f CL41/FY10
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72144X IS AN ASSOCIATED PROJECT.
PE 1997 ROW CONST
$
144
AFTER 98
AFTER 98
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
21-Sep-1995
_Page 40
FISCAL YEAR
COST ESTS
FULTON 7D7017
STATUS:
PROCUREMENT OF 54 CLEAN ENGINE & 83 CNG BUSES TRANSIT PROJECTS / CAPITAL. FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
37400 29920
7480
FULTON 7D7.019
STATUS:
RAIL CONSTRUCTION PROGRAM -NORTH"LINE. EXTENSION - MEDICAL
TRANSIT PROJECTS / CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH CENTER TO NORTH SPRINGS AND VEHICLES
CONG DIST. 5 & 4
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
53013 42410
10603
FULTON 7D7101
STATUS:
FIXED GUIDEWAY MODERNIZATION PROGRAM - LINE STRUCTURE REHAB, TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH STATION REHAB, RAIL CAR MID-LIFE OVERHAUL - 13.
CONG DIST, 5 & 4.
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
7D710X IS~ ASSOCIATED PROJECT.
0TH SHARE$
7877 6307
1570
FULTON 7D7165
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1996 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA
MANAGER: STEVE KISH
CONG DIST, 5 & 4
OPERATING 1996 $
FUND SOURCE: URBAN TRANSIT
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
7D716X IS AN ASSOCIATED PROJECT,"
0TH SHARE $
9403 4702
4702
FULTON 7D7176
STATUS:
CAPITAL/PLANNING - CAPITAL MAINTENANCE, TRANSIT PROJECTS/ .CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH OFFICE EQUIPMENT, SHORT RANGEPLANNING;
BUS PROCUREMENT, ETC.
CONG DIST, 5 & 4
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
7D717X IS AN ASSOCIATED PROJECT.
0TH SHARE $
26821 21457
5364
FULTON 7D7507
STATUS:
RAIL CONSTRUCTION PROGRAM- NORTH LINE EXTENSION - MEDICAL TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH CENTER TO NORTH SPRI~GS AND VEHICLES
CONG DIST, 5_ & 4
CAPITAL 1997
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
75000 . 60000
15000
FULTON 7D7508
STATUS:
FIXED GUIDEWAY MODERNIZATION PROGRAM - LINE STRUCTURE REHAB,
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH STATION REHAB/RENOVATION - RAIL CAR MID-LIFE OVERHAUL - 14
CONG DIST. 5 & 4
CAPITAL 1997
$
FUND SOURCE: URBAN TRANSIT DISC.--.
FED SHARE $
FEDERAL TRANS_IT ADMIN - FUNDS
GA. SHARE $
0TH SHARE $
7877 6307
1570
"
l!ll!!!!!l!!I 11!1!1!!11 !!!11!!!!!!1 l!!ll!!!!!!i l!iJ!!IB
~ iiJie!!l . l!!fi!!!!!i !!!!i!l!!!! ll!ffJ!!!.li
t. :..~:
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
21-Sep-1995 Page 41
PROJECT LISTING BY RDC FY 1996/FY 1998
-CP-O-.IU-.NN-T-OY-.----------------DP-RE-OS-CJ-ER-C-ITP-T-ID-OA-NT-A---------R-AE-RG-CI-O-N-A-L--D-E-V-E-L-O-P-M-E-N-T--C-O-M--M-I.-S-SI-O-N-------C-O-M-M--EN-T-S--------------------------F-I-YS-ECA-AR-L--------CE-OS-TS-TS--
FULTON 7D7509
STATUS:
FIXED GUIDEWAY MODERNIZATION PROGRAM - LINE STRUCTURE REHAB,
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH STATION REHAB/RENOVATION - RAIL CAR MID-LIFE OVERHAUL
CONG DIST. 5 & 4
CAPITAL 1998
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE$
7884 6307
1577
FULTON 7D7510
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1997. TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA
MANAGER: STEVE KISH
FULTON 7D7511
STATUS:
CAPITAL/PLANNING. - CAPITAL MAINTENANCE, BUS PROCUREMENT,
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH OFFICE EQUIPMENT, SHORT RANGE TRANSIT PLANNING, ETC.
CONG DIST. 5 & 4
OPERATING 1997
$
FUND SOURCE: URBAN TRANSIT
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
7D751X IS AN ASSOCIATED PROJECT.
0TH SHARE$
9059 4530
4530
CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
26821 21457
5364
FULTON 7D7521
STATUS:
RAIL CONSTRUCTION PROGRAM - NORTH LINE EXTENSION - MEDICAL
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH CENTER TO NORTH SPRINGS AND VEHICLES
CONG DIST. 5 & 4
CAPITAL 1998
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
72500 60175
6075 6250
FULTON 7D7523
STATUS:
BUS RELATED PROCUREMENT - 17 BUSES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1998
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
3795 3036
759
FULTON 7D7525
STATUS:
TRANSIT OPERATING ASSISTANCE FOR FY 1998 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1998
$
FED SHARE $
GA. SHARE $
0TH SHARE $
9059 4530
4530
FULTON 7D7526
STATUS:
CAPITAL/PLANNING - CAPITAL MAINTENANCE, BUS PROCUREMENT,
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH OFFICE.EQUIPMENT, SHORT RANGE TRANSIT PLANNING, ETC.
CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1998
$
FED SHARE $
GA. SHARE $
0TH SHARE $
26821 21457
5364
COUNTY P,I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
FULTON 7D7527
STATUS:
PURCHASE &-LEASING OF INTERCITY BUS COACHES FOR INTERCITY TRANSIT PROJECTS./ CAPITAL FUNDS RECIPIENT: INTERCITY BUS CARRIERS MANAGER: STEVE.KISH
BUS CARRIERS, TRAILBLAZER SIGHNING PROGRAM
CONG DIST. 5
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
21-Sep-1995 Page 42
FISCAL YEAR
,COST ESTS
CAPITAL 1996
$
62
FED SHARE $
31
GA. SHARE $
0TH SHARE $
31
FULTON 7D7600
STATUS:
PURCHASE AND LEASING OF INTERCITY COACHES FOR INTERCITY BUS
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: INTERCITY BUS OPERATORS MANAGER: STEVE KISH OPERATORS, TRAILBLAZER SIGHNING PROGRAM
CONG DIST. 5
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$
FED SHARE $
GA, SHARE $
0TH SHARE $
1880 1504
188 188
FULTON 7Vl027
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT:.AGENCIES IN FULTON COUNTY
MANAGER: STEVE KISH
.
CONG DIST. 5
CAPITAL 1996
$
87
FOND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
70
FEDERAL TRANSIT ADMIN FUNDS
GA, SHARE $
8
0TH SHARE $
9
FULTON 7V7015
STATUS:
ELDERLY AND DISABLED VEHICLEs'ANo EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY MANAGER: STEVE KISH
CONG DIST, 5
CAPITAL 1997
$ 109
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
87
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
11
0TH SHARE$
11
FULTON 7V7027
STATUS:
ELDERLY AND DISABLED VEHICLES ANO EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY MANAGER: STEVE ~ISH
CONG DIST. 5
CAPITAL 1998
$
136
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
109
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
14
0TH SHARE $
14
FULTON 712273
STATUS:
I-285 NOISE WALLS FM NORTHSIDE WALLS/ NEW CONSTRUCTION LENGTH(Miles/km): .00/.00000 MANAGER: UNKNOWN NOT APPLICABLE
PARKWAY TO I-BS/DEKALB EXIST. LANES: 0 /PROPOSED
LANES:
ATLANTA TIP i R 044
CONG DIST, 5 & 6 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1996
$
FED SHARE $
GA, SHARE $
0TH SHARE $
0 , 0 J
1800 1620
180
FULTON 712360
STATUS:
I-285@ WASHINGTON RD/INCL WON WASHINGTO RD 600' W OF BR INTERCHANGE/ RECST. OR REHAB. LENGTH(Miles/km): ,51/.82059 - EXIST. LANES: 4 /PROPOSED LANES: MANAGER: D. CHURCH SIGNED CITY OF_EAST POINT 3-16~87 FOR.UTILITIES
V.'
ATLANTA TIP# FS 017 CONG DIST. 5 5 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1988
UNDERWAY -
ROW 1991
UNDERWAY
CONST 1998
$ 1651
FED SHARE $ 1486
GA, SHARE $
T65
0TH SHARE $
- ....... ...... ,,
COUNTY P.I.NO.
I!!!!!!!!!
DESCRIPTION PROJECT DATA
Ill!!!!!!
~ ~
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
FULTON 712940
STATUS:
I-75@ MT PARAN ROAD
ATLANTA TIP# R 105
INTERCHANGE/ RECST, OR REHAB.
CONG DIST. 5
LENGTH(Miles/km): .30/.48270 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS
FUND SOURCE: CONG MIT./AIR QUAL
CITY OF ATLANTA HAS NO UTIL INVOLVED.
FEDERAL HIGHWAY ADMIN FUNDS
FULTON 712950
STATUS:
I-85@ MONROE DRIVE & 71Y950 FOR 04M $ FOR R/W INTERCHANGE/ RECST. OR REHAB. LENGTH(Miles/km): .30/.48270 - EXIST. LANES: 0 /PROPOSED MANAGER: G. ROSS
CITY OF ATLANTA HAS NO UTILITIES INVOLVED.
LANES:
ATLANTA TIP# R 106 CONG DIST .. 4
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
FULTON 713030
STATUS:
ADDL PE FOR DESIGN OF NEW I-285 SR 400 INTERCHANGE & CD SYST INTERCHANGE/ RECST. OR REHAB. LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 8 /PROPOSED LANES: MANAGER: NEIL DAVIS
ATLANTA TIP f FN-R 188
CONG DIST. 5 14
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 43
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW 1997 $ 9331
CONST 1997 $ 2162
FED SHARE $ 1730
GA. SHARE $
432
0TH SHARE $
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1997 $ 4590
FED SHARE $ 3672
GA. SHARE $
918
0TH SHARE $
PE 1996 ROW NONE CONST NONE
UNDERWAY
$
0
$
0
FULTON 713157
STATUS:
COMM:UNICATION CABLE I-20 FROM CAPITOL AVENUE TO I-285/DEKALB
ATLANTA TIP f R 202
MISCELLANEOUS IMPROVEMENTS/ SAFETY
CONG DIST. 11 & 5
LENGTH(Miles/km): 9.70/15.60730 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: SAM ZEIGLER
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
71315X IS AN ASSOCIATED PROJECT.
FULTON 713230
STATUS:
I-285@ RIVERSIDE DR; TURN LANES & RELOCATE RAMPS BRIDGES/ RECST. OR REHAB. LENGTH(Miles/km): .00/.00000 MANAGER: NEIL DAVIS
ATLANTA TIP# FN-R 185 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1998
$
FED SHARE$
GA. SHARE$
0TH SHARE $
0
0
6400 5120 1280
PE 1995 ROW CONST
UNDERWAY AFTER 98 AFTER 98
FULTON 713330
STATUS:
I-285 SOUTH TO I-20 WEST RAMP GEOMETRY WEST OF ATLANTA RAMP/ RECST. OR REHAB. LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 2 /PROPOSED
MANAGER: D, SMITH
LANES:
ATLANTA TIP f AT-R 178 CONG DIST. 5
2 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
. PE 1995 ROW CONST
UNDERWAY AFTER 98 AFTER 98
FULTON 713400
STATUS:
I-285 SURVEILL/ATIS FM I-75 IN COBB EAST TO I-85 IN DEKALB
ATLANTA TIP f R 200
MISCELLANEOUS IMPROVEMENTS/ SAFETY
CONG DIST. 5 & 6
LENGTH(Miles/km): 13.17/21,19053 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: SAM ZEIGLER
FUND SOURCE: CONG MIT./AIR QUAL
NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
71340X IS AN ASSOCIATED PROJECT.
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
2000
1600
400
COUNTY P.I.NO. FULTON 71Y030
STATUS:
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
DESCRIPTION
ARC
PROJECT DATA
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
-
-
.
PE FOR DESIGN OF NEW I-285 SR 400 INT, FOR ADDL PE$; 713030
_ATLANTA TIP f FN-R 188
INTERCHANGE/ RECST. OR REHAB.
,CONG DIST. 5
LENGTH(Miles/km): .00/ ;o0000 - EXIST. -LANES: 8 /PROPOSED LANES: 14
MANAGER: . UNKNOWN
FUND SOURCE: NAT'L HIGHWAY
l [
FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 44
FISCAL
~EAR .
PE 1996 ROW NONE CONST NONE
COST ESTS
UNDERWAY
$
0
.'$
-0
FULTON. 71Y950
STATUS:
I-85@ MONROE DRIVE - FOR IM R/W FUNDS; SEE 712950
INTERCHANGE / RECST. OR REHAB.
. .
.
LENGTH(Miles/km): .30/".48270 - EXIST. LANES: 0 /PROPOSED
MANAGER:
LANES:
ATLANTA TIP i R 106
CONG DIST. 4
0 FUND SOURCE: I-STATE-'MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 'Row 1996
CON.ST NONE
0 UNDERWAY
$ 12100
$
0
FULTON 72012X
STATUS:
N'SIDE PKWY@ CHATTAHOOCHEE RVR INCL APPR/SEE COBB C0-720125
ATLANTA TIP i AT12/C024
UNKNOWN/ UNKNOWN
CONG DIST, 0 & 0
LENGTH(Miles/km): .00/.00000 - EXIST. LANES: 0 /PROPOSED LANES: _o
MANAGER: A. ALEXANDER
FUND SOURCE: BRIDGE PROGRAM
REQ FULTON DO UTIL 1-21"82; COBB SGN 10-10-79 FOR UTIL
FEDERAL HIGHWAY ADMIN FUNDS
720125 IS AN ASSOCIATED PR?JECT.
FULTON 720570
STATUS:
BANKHEAD HWY/SR 8 FM PROCTOR CRK TOE OF SCL RR BRIDGE RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
LENGTH (Miles/km): . 51/. 82059.
MANAGER: BILL MOSKAL CITY OF ATLANTA SIGNED 9/6/89 FOR UTILITIES
ATLANTA TIP f AT 004 . . CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST NONE
$
0
PE 1993 ROW 1998 CONST
UNDERWAY
$ 1184 AFTER 98)
FULTON 721010
STA1US:
SR 9/ROSWELL FM DUNWOODY PL TO 5-LANE SECTION N OF HILL ST
RECONSTRUCTION & WIDENING FROM 3 LANES TO 4 LANES.
LENGTH(Miles/km): 2.20/3'.53980:.
.
MANAGER: RAY METTS
REQ CO DO PUB UTIL 12-2-91; ROSWELL SGN 1-12-94 UTILITIES
FULTON SR 140/HOUZE RD FM MANSELL RD NORTH TO NEAR RANCHETTE RD
721300 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 4.55/7.32095 MANAGER: RAY METTS
ST.ATOS: REQ COUNTY & CITY/ROSWELL DO UTILITIES 12-28-89
ATLANTA TIP i FN 007 ~ CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 751550 IS AN ASSOCIATED PROJECT.
ATLANTA TIP # FN 062 CONG DIST. 6
FUND SOURCE:' SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
_PE 1992 ROW 1998 CONST
PE 1992 ROW CONST
UNDERWAY' $ 9000 AFTER 98
- ..
UNDERWAY' AFTER 98 AFTER 98 ,._
FULTON 721305
STATUS:
;SR 140/HOUZE RD FM RANCHETTE RD TO CR 311/CHEROKEE CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
LENGTH(Miles/km): 3.25/5.22925
MANAGER: RAY METTS . , .
r
REQ ~OLTON DO UTIL 12-28-89;~HE~O~E~.SGN 1~3-90-UTILITIES.
ATLANTA.TIP#' FN 013 CONG DIST. 6
FUND SOURCE: SURFACE.TRANSPORT. "FEDERAL HIGHWAY ADMIN FUNDS
PE 1992,. UNDERWAY
ROW
AFTER 98
CONST -~ 3 AFTER 98
ll!!!I!!!! l!l!!!!!!!!I
l!!!l!!!!il @l!!1!i!I lf!JM
l!l!!!l!!l!
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY RDC FY 1996/FY 1998
ARC
REGIONAL DEVELOPMENT COMMISSION
COMMENTS
FULTON 721308
STATUS:
SR 140/HOUZE RD@ LITTLE RIVER@ CHEROKEE CO LINE
REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
LENGTH(Miles/km): .05/.08045
MANAGER: RAY METTS
.
REQ FULTON DO UTIL 12-28-89;CHEROKEE SGN 1-3-90-UTILITIES
ATLANTA TIP# FN 013 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72130Z IS AN ASSOCIATED PROJECT.
FULTON 721410
STATUS:
SR 166/CAMPBELLTON RD/ATLANTA FM ENON RD EAST TO BARGE RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 2.80/4.50520
MANAGER: G. ROSS
ATLANTA TIP# AT 032 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
21-Sep-1995 Page 45
FISCAL YEAR
COST ESTS
PE 1991 ROW CONST
UNDERWAY AFTER 98 AFTER 98
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
FULTON 721460
STATUS:
SR 9@ C'HOOCHEE RVR/INCL INT@ AZALEA & RIVERSIDE & 72Y460 REHAB, OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 8 LANES. LENGTH(Miles/km): .29/.46661 MANAGER: RAY METTS REQ CO DO PUB UTILS 12-2-94; ROSWELL SGN 1-12-94 UTILITIES
FULTON 721570
STATUS:
SR 14 1-WAY PAIR/PALMETTO FM S CTY LMTS TO SR 154 NEAR N C,L
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. LENGTH(Miles/km): 1.60/2.57440 MANAGER: J. GARLAND
ATLANTA TIP# FN 007 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72Y460 IS AN ASSOCIATED PROJECT,
ATLANTA TIP# FS 050 CONG DIST, 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 98 AFTER 98
PE 1992 ROW CONST
UNDERWAY AFTER 98 AFTER 98
FULTON 721750
STATUS:
SR 3/NORTHSIDE DR@ BANKHEAD HWY; @ NORTH AVE;@ MARIETTA ST.
ATLANTA TIP# AT 076
INTERSECTION IMPROVEMENT/ RECST. OR REHAB,
CONG.DIST. 5
LENGTH(Miles/km): .75/1.20675 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: G. ROSS
FUND SOURCE: NAT'L HIGHWAY
REQ COUNTY AND ATLANTA DO PUBLIC UTILITIES 9-20-91
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 98 AFTER 98
FULTON 72177X
STATUS:
SR 166 FM OLD LOWER RIVER RD TO SR 70, .. SEE DOUGLAS CO UNKNOWN/ UNKNOWN LENGTH(Miles/km): ,00/,00000 - EXIST. LANES: 0 /PROPOSED LANES: MANAGER: G, ROSS
ATLANTA TIP f DO 019
CONG DIST. 0 & 0
0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721770 IS AN ASSOCIATED PROJECT.