Fiscal Years
1994 1995 1996
i
i
i
I
!
-~ ~1 jj.
.
?, .
'
i
';
INTRODUCTION
The Statewide Transportation Improvement Program (STIP) is developed to comply with the provisions of the Intermodal Surface Transportation Efficiency Act of 1991 (!STEA). The STIP contains Federal Aid projects programmed for Fiscal Years 1994, 1995 and 1996. The projects have been identified through the planning process and represent transportation needs statewide.
The STIP includes Highway and Bridge, Bicycle,. Pedestrian, Transportation Enhancement, and Public Transportation (transit) projects. Phases of projects, also referred to as projectrelated activities, such as PE (Preliminary Engineering), ROW (Right of Way) and CONST (Construction) are given for highways, and capital and operating for transit. The projects are organized by County and by mode of transportation. The STIP format has been standardized with the same information for each project.
The STIP is a federal requirement for receipt of Federal Highway
Administration and Federal Transit Administration funds. The
STIP must be fiscally balanced. Projects and phases of projects
listed must only include those for which there is funding
available or for which there is a reasonable expectation of
obtaining funds. Federal funds for Fiscal Years 1994, 1995 and
I
1996 are program estimates and will not be final until after the
federal budget is approved by October 1 of each year.
The STIP is a cooperative effort between local governments, the Metropolitan Planning Organizations, lead agencies for urban area planning, and the Georgia Department of Transportation. The Metropolitan Planning Organizations, through the urban area planning process, have identified local transportation needs in urban area Transportation Improvement Programs. The urban area projects are included in the STIP along with rural area projects identified by the Department 1n consultation with local governments.
The three year Statewide Transportation Improvement Program
includes nearly 1,600 projects totaling $2.6 billion in federal,
f;
state and local funds. Projects funded with !STEA Title I
Ii
(highway) funds make up 69% of the project-related activities and. 83% of the funding; projects funded with !STEA Title III
(transit) funds represent 31% of the projects and 17% of the
expenditures.
Reconstruction and rehabilitation of existing highways and bridges account for 38% of the STIP funding. The next highest category of programmed STIP spending for highways is new construction - approximately 14% of the total. Maintenance represents 13.7% of the program.
,
D
Public Transportation projects make up 31% of projects in the STIP - capital purchases and operating ass1stance are the major activities. Public transportation program funds are used for purchase of vehicles and other transit equipment.
The Statewide Transportation Improvement Program places emphasis
on maintaining and improving the existing highways, bridges, and
public transportation equipment. The public transportation
program expenditures focuses on replacement of vehicles and
.L
other operating equipment as a means of improving public transit
operations, safety, and meeting the requirements of the
Americans with Disabilities Act. Figures 1 and 2 depict the
number of projects and amount of funding for the three year
period. Fiscal Years 1994, 1995, and 1996.
The Georgia Department of Transportation is pleased to make -this
document available. We welcome any comments on the STIP; please send your comments to:
H!
ii iii
Georgia Department of Transportation
&
Office of Planning
i
No. 2 Capitol Square
M
Atlanta, Georgia 30334
!.
i
Att: Marta V. Rosen
i
(404) 656-5725
I I
rt Ct
GLOSSARY OF ACRONYMS AND ABBREVIATIONS
FOND SOURCE:
\t
CATFX;ORIES OF FEDERAL HIGHWAY ACT (FHWA) FUNDING
CONG MIT./AIR QUAL - Congestion Mitigation/, Air Quality FED. LANDS - Federal Lands HWY. SAFETY - Highway Safety I-STATE MAINT. - Interstate Maintenance I-STATE CONST. - Interstate Construction NAT'L HIGHWAY - National Highway System OLD URBAN SYSTEM - funds allocated to Georgia before ISTEA SURFACE TRANSPORT. - Surface Transportation Program TRANS. ENHANCE. - Transportation Enhancement Assistance
CATFX;ORIES OF FEDERAL TRANSIT ACT (FTA) FUNDING
:r:
URBAN TRANSIT DISC. - Discretionary assistance
!
awarded on a competitive basis by the FTA; ADA or
CAA indicates Americans with Disabilities Act
"
project or Clean Air Act project .
URBAN TRANSIT - Urban Area assistance - can be
capital or operating funds; ADA or CAA indicates
l
Americans with Disabilities Act project or Clean
Air Act project.
ELDERLY & DISABLED - Assistance for Elderly and
Handicapped capital projects.
RURAL TRANSIT - Rural Area assistance - can be
capital or operating funds.
OTHER ACRONYMS/ ABBREVIATIONS
BR - Bridge
CONG DIST. - Congressional District
CONST - Construction
CS - City Street
CR - County Road
CWP
Construction Work Program. The
Construction Work Program includes projects in
two phases Phase I (first three years of the
Program) and Phase II (next three years of the
Program). The STIP is derived from Phase I
projects.
FED SHARE - Federal Share of the cost of the
project
FM - Indicates from
GA. SHARE - Georgia Share of the cost of the
project
HOV LANES
High Occupancy Vehicle lanes;
I
1
designated lanes used exclusively for multiple-occupancy vehicles.
INT - Intersection, usually seen as smith Road
Int Jones Street.
LGPA - Local Government Project Agreement. These
agreements outline highway and bridge project
responsibilities between the GDOT and the local
government. The status line will indicate if an
agreement has been requested, signed or refused
(a signed or refused agreement would have the
date of the transaction noted on the project
description). Most LGPA address sharing
responsibilities for right of way, utilities or
detours.
LOC SHARE - Local Share of the cost of the
project
N, S, E, W - North, South, East, West. May
also be used in combinations of NE, SW etc.
NB, SB, EB, WB - North Bound, South Bound, East
Bound,. West Bound indicating direction of
movement. Sometimes will be shown as NBL, SBL,
EBL or WBL to indicate North Bound Lane, South
Bound Lane, East Bound Lane or West Bound Lane.
B OR BU OR BUS - Business Route
...
BYP - Bypass or Circumferential Route CONN - Connector
EXT - Extension
FRNTG - Frontage
NOISE BARR. - Noise Barrier
PE - Preliminary Engineering indicates an early
phase of project development that may include
surveys, design, environment.al and other work
done in project development.
P.I. NO. - Program Item Number is unique to each
project.
PKWY -Parkway
RECST. OR REHAB.
Reconstruction or
Rehabilitation
RTL OR LTL - Right Turn Lane or Left Turn Lane
R/W or ROW - Right of Way
SR - State Route
T&S PROJECT - Traffic and Safety Project
TIP
Transportation Improvement Program
developed by the Metropolitan Planning
Organizations
UTL OR UTIL - Utilities
EIE i
I
n
-~
l~ liill1lillilll
- ' ~ -
~
~
_ 1 ~ W
~ -
~ -.,:.. .t--i
~ . 1.~t"i--1.~
\lf},o/.1!ffl .
-
1!1>"-W
-==...i. fll .
-~-= lllil
-
l"-'''-0
......_
,.;,o,cc.c-,,
f.+.,;}~'
'', '
i'~c'"...
i'' ,,.,..,-_
.
:,- ._;,
STATEWIDE FUNDS DISTRIBUTION
FEDERAL_AID PROJECTS(FY-1994-1996)
COUNT OF PROJECTS
OTHER
24
PUBLIC TRANSIT
491
NEW CONSTRUCT . 64
ENHANCEMENT 71
RECST/REHAB
410
SAFETY
207
MAINTENANCE BRIDGE REPLACEMENT 71
241
TOTAL= 1600
FIGURE 1
"
L
,1.'
~
., ... ~
~
~
'
~
~
~
f,.'f.:'!?,:?'1
Fl!,...!!!.~
., f'.f.i....~
~
;; \
~
~
~~~1
r~~--~:-:-1
. '-~.,:: ,,...,...
--~;_
~
,;
STATEWIDE FUNDS DISTRIBUTION
FEDERAL_AID PROJECTS(FY 1994-1996) -
PROJECT COST(MILLIONS $)
PUBLIC TRANSIT
OTHER
$453.1
r
$65.8
NEW CONSTRUCT
$365.2
RECST/REHAB $979.7
ENHANCEMENT $57.7
SAFETY $181.4
. MAINTENANCE BRIDGE REPLACEMENT $355.4
$149.6
TOTAL = 2.6 BILLION
FIGURE2
II
fflM
- ..... Ii!!@!! ~
-,:
,
'"
~
~ -~
~Jffl
fa!~!!
~~f!,
'
~
,~~ei
~~~ti
~
~
~'.'f:"'~
< ';-,
;.1}
i~ ,..,-~ . . .
. , "
i,.,.' ...
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 1
COUNTY
DESCRIPTION
P.I.NO.
PROJECT DATA
-------------------.
--
ALL
THREE CONVERSION VANS (2 WITH LIFTS); AND ONE STANDARD VAN
FISCAL
COST
---C-O-M--M-E-N-T-S ---------------------------Y-E-A-R --------E-S-T-S --
7C2512 TRANSIT FACILITIES/ CAPITAL
CONG DIST. 5
FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1994
$
109
FED SHARE$
87
GA. SHARE$
22
0TH SHARE$
ALL 7C2513
TWO CONVERSION VANS (1 WITH A LIFT); AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH
CONG DIST. 5
CAPITAL 1995
$
80
FUND SOURCE: RURAL TRANSIT
FED SHARE$
64
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
16
0TH SHARE$
ALL 7C2514
TWO CONVERSION VANS (1 WITH A LIFT); AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH
CONG DIST. 5
CAPITAL 1996
$
81
FUND SOURCE: RURAL TRANSIT
FED SHARE$
65
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
16
0TH SHARE$
ALL 8Vl010
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL 1994
$ 287
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
230
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
28
0TH SHARE$
29
ALL 8V1011
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA.
MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL 1995
$ 297
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
238
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
29
0TH SHARE$
30
ALL 8Vl012
ELDERLY AND DISABLED VEHICLES. AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL ,1996
$ 308
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
246
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
31
0TH SHARE$
31
ALL 8Vl013
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL 1994
$ 181
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
145
FEDERAL TRANSIT ADMIN.FUNDS
GA. SHARE$
18
0TH SHARE$
18
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATIO'. IMPROVEMENTS PROGRAM
Page 2
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
-FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
8Vl014 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 0
FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
CAPITAL 1995
$ 187
MANAGER: STEVE.KISH.
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 150
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
18
0TH SHARE$
19
ALL 8Vl015
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
MANAGER: STEVE KISH
.
CONG DIST. 0
CAPITAL 1996
$ 194
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
155
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
20
0TH SHARE$
19
ALL 8Vl016
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL, COUNTIES - SOUTH GA. MANAGER: STEVE KISH
CONG D.IST. 0
CAPITAL 1994
$ 205
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 164
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
21
0TH SHARE$
21
ALL 8Vl017
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL 1995
$ 212
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 170
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
21
0TH SHARE$
21
ALL 8Vl018
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL 1996
$ 220
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 176
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
22
0TH SHARE$
22
ALL 044094
LUMP SUM MAINTENANCE FUNDED "0_4 4" FOR FY 19 9 4
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
2921 2629
292
ALL 044095
LUMP SUM MAINTENANCE FUNDED "044" FOR FY 1995
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL; STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
23862 21476
2386
- . V
...
ll_l.
..,
-
-
~ ~
,. a:- ..
~
~
~
me
~
~
. 6'!'.~.:.tli'=J
IL!~~
,.,.,~~
LK'.I:'/
1;.c "}i1
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
ALL 044096
LUMP SUM MAINTENANCE FUNDED "044" FOR FY 1996
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
. ~~~~ w;------~: ' ,
r''
16-Sep-1993 Page 3
FISCAL YEAR
COST ESTS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$ 0TH SHARE$
0
0
27778 25000
2778
ALL 04MB94
LUMP SUM BRIDGE PAINTING "04M" FOR FY 94
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
5064 4558
506
ALL 04MB95
LUMP SUM BRIDGE PAINTING "04M" FOR FY 95
BRIDGES/ MAINTENANCE .PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0 4444 4000
444
ALL 04MB96
LUMP suM BRIDGE PAINTING "04M" FOR FY 96
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$ 0TH SHARE$
0 0 4444
4000
444
ALL 315094
LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
27293 21834
5459
ALL 315095
LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
36500 29200
7300
ALL 315096
LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
36500 29200
7300
r
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 4
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
A--LL--------LU-M--P--SU-M---IN--ST-A--LL LO-G--O -- SIGNS ON NATIONAL -- HWY SYSTEM - 1994
--- -----------------------------4---------------------------
PE NONE $
0
315L94 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONG DIST. 99
ROW NONE $
0
CONST 1994 $ 100
MANAGER:
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
80
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE.$
20
0TH SHARE$
ALL 315L95
LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYS - 1995 sIGNING / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. -99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1995 $ 100
FED SHARE$
80
GA. SHARE$
20
0TH SHARE$
ALL 315L96
LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYSTEM - 1996 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
. ROW NONE $
0
CONST 1996 $ 100
FED SHARE$
80
GA. SHARE$
20
0TH SHARE$
ALL 315094
LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1994 LIGHTING/ MAINTENANCE PROJECT. MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1000 800 200
ALL 315095
LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1995
LIGHTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1000 800 200
ALL 315096
LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1996
LIGHTING / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1000 800 200
ALL 33A094
LUMP SUM SAFETY "OPTIONAL" FOR FY94 UNKNOWN/ TRAFFIC PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER
CONG DIST. 99
FUND-SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1060 954 106
~
'.,:
.
. ,....._ ..~
-
II!!!!!!
- - l!l~!!!l
"
~
~
~
~
~
f~
~
~
~
~
~
~~~
.t
I~;...,:~~:'.~
41',a
!-1.,., ...... ;....,:;1
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 5
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM SAFETY "OPTIONAL" FOR FY95
PE NONE $
0
33A095 UNKNOWN/ TRAFFIC
CONG DIST, 99
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1995
$
900
MANAGER: W HESTER
FUND SOURCE: HWY. SAFETY
FED SHARE$
810
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE.$
90
0TH SHARE$
ALL 33A096
LUMP SUM SAFETY "OPTIONAL" FOR FY96 UNKNOWN/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1996
$
900
FED SHARE$
810
GA. SHARE$
90
0TH SHARE$
ALL 33C094
LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
2500 2000
500
ALL 33C095
LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F
RIDING SURFACE .REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
2500 2000
500
ALL 33C096
LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
.
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
7500 6000 1500
ALL 33CB94
LUMP SUM BRIDGE PAINTING "33C" FOR FY 94
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $
CONST 1994 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1444 1155
289
ALL 33CB95
LUMP SUM BRIDGE PAINTING "33C" FOR FY 95
BRIDGES/ MAINTENANCE PROJECT MILEAGE : ,00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA; SHARE$ 0TH SHARE$
6
0
3750 3000
750
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 6
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
.A-L-L-------L-U-M-P--S-U-M--B-R-I-D-G-E--P-A-I-N-T-I-N-G--"-3-3-C-"--F-O-R--F-Y---96------------------------------------------------------------------P-E--N-O-N-E-----$------.o
33CB96 BRIDGES/ MAINTENANCE
CONG DIST. 99.
ROW NONE $
0
PROJECT MILEAGE : .00
CONST 1996 $ 3750
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 3000
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 750
0TH SHARE$
ALL 330094
LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 94
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 11329
9063 2266
ALL 330095
LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 95
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK
0
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1995 . $
FED SHARE$
GA. SHARE$
0TH -SHARE$
0 0 15000 12000 3000
ALL 330096
LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 96
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0. 0 11400 9120 2280
ALL 33DB94
LUMP SUM BRIDGE PAINTING "33D" FOR FY 94 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED. SHARE $
GA. SHARE$
0TH SHARE$
0 O 5000
4000 1000
ALL 33DB95
LUMP SUM BRIDGE PAINTING "33D" FOR FY 95 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE $
CONST1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 5000 4000 1000
ALL 33DB96
LUMP SUM BRIDGE PAINTING FOR "330" FOR FY 96 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE .$ ROW NONE $ CONST.1996 $
FED SHARE$
GJC SHARE $
0TH SHARE$
0 0 5000 4000
1000
...,
\a
....
f
-
l!IM
- . ll!IM '
MB
~
~
. ~ ~ ~ ~ ~tt~ ~~
GEORGIA DEPARTMENT OF TRANSPORTATION
~i~~
~c.:,Jii!.
..)>;>.~
. v,:--,;~
...;- ,:-~~--~
....... -.--~~
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 7
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM INSTALLATION OF LOGO SIGNS "1994"
PE NONE $
0
33DL94 SIGNING/ TRAFFIC
CONG DIST. 99
ROW NONE
$
0
PROJECT MILEAGE : .00 - EXIST. ~ES: 0 /PROPOSED LANES: 0
CONST 1994 $
50
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
40
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
10
0TH SHARE$
ALL 33DL95
LUMP SUM INSTALLATION OF LOGO SIGNS "1995" SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
PE NONE $
0
CONG DIST. 99
ROW NONE $
0
CONST 1995 $
50
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
40
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
10
0TH SHARE$
ALL 33DL96
LUMP SUM INSTALLATION OF LOGO SIGNS "1996"
SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:
PE NONE $
0
CONG DIST. 99
ROW NONE $
0
CONST 1996 $
50
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
40
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
10
0TH SHARE$
ALL 33MS94
LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 94
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE $
0TH SHARE$
0 0 2177 1959 218
ALL 33MS95
LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 95
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0. -
o
3400 3060
340
ALL 33MS96
LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 96
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER
CONG DIST. 99
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE, $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 3026 2723 303
ALL 33NS94
LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 94
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$ 0TH SHARE$
0 0 1300
1170 130
GEORGIA DEPARTME"'T OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
Page 8
COUNTY
DESCRIPTION
P. I.NO.
PROJECT DATA
----- - - - ALL
LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 95
33NS95 RR XING / TRAFFIC
FISCAL
COST
COMMENTS
YEAR
ESTS
-----------------------------------------------------------------
PE NONE $
0
CONG DIST. 99 '
ROW NONE $
0
PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0
CONST 1995
$
720
MANAGER: W HESTER
FUND .SOURCE: HWY. SAFETY
FED SHARE$
648
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
72
0TH SHARE$
ALL 33NS96
LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 96 RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 2488 2239 249
ALL 3AA094
LUMP SUM MAINT. FOR POP BET 5000-200,000 FOR FY 94
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L .- SEABROOK
.
FUND SOURGE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 12300 9840 2460
ALL 3AA095
LUMP SUM MAINT. FOR AREA POP BT SK - 200K FOR FY 1995
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILE}\.GE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
.
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 12500 10000
2500
ALL 3AA096
LUMP SUM MAINT. FOR AREA POP BET 5,000-200,000 FOR FY 96
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST, 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT .
. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 12500 10000
2500
ALL 3AAB94
LUMP SUM BRIDGE PAINTING "3AA" FOR FY 94
BRIDGES/ MAINTENANCE
J
PROJECT MILEAGE : .00
MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
617
FED SHARE$
494
GA. SHARE$
123
0TH SHARE$
ALL 3AAB95
LUMP SUM BRIDGE PAINTING "3AA" FOR FY 95
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE $
0TH SHARE$
0 0 6250 5000 1250
,..
,.
, ....
fflM
-
-"'
...
~
11M
l!llM
Mffl
~
I!!!!!'!!!
~
"
..11'!::tt:!liJ
~
~~;.~~
~~~
!,. .,...U
.,. . ~
I . . . . . _
--
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 9
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM BRIDGE PAINTING "3AA" FOR FY 96
PE NONE $
0
3AAB96 BRIDGES/ MAINTENANCE
CONG DIST. 99
ROW NONE $
0
PROJECT MILEAGE : .00
CONST 1996 $ 6250
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT ..
FED SHARE$ 5000
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 1250
0TH SHARE$
ALL 770391
LUMP SUM -- 817 SIGNALS FOR METRO ATLANTA REMAINING FUNDING SIGNALS'/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
ATLANTA TIP t R 98
CONG DIST. 5 & 4
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
100
CONST 1996 $ 46985
FED SHARE $ 37588
GA. SHARE $ 9397
0TH SHARE $
ALL 770392
PE FOR METRO ATLANTA SIGNAL SYSTEM PROJECTS PRELIMINARY ENGINEERING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP t R 98
CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST NONE
UNDERWAY
$
0
$
0
ALL 811010
STUDY OF AUTOMATIC MOTOR-CARRIER CLEARANCE (ADVANTAGE I-75) SPECIAL STUDIES/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: I-STATE MA.INT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW NONE CONST NONE
$ 2200
$
0
$
0
ALL 811020
RURAL IVHS I-85, I-16, I-95, I-75 AND I-20 MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ALL 870000
FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1994 SPECIAL STUDIES/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 99 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 99 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW NONE
UNDERWAY
$ .
0
CONST 1994 $ 2310
FED SHARE $ 2310
GA. SHARE $
0TH SHARE $
PE 1994 ROW NONE CONST NONE
$ 3000
$
0
$
0
ALL 870010
FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1995 SPECIAL STUDIES/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 99
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW NONE CONST NONE
$ 3000
$
0
$
0
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 10
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1996
PE 1996 $ 3000
870020 SPECIAL STUDIES/ PLANNING
CONG DIST. 99
. ROW.NONE. $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE $
0
MANAGER:
FUND SOURCE: UNKNOWN
FEDERAL HIGHWAY ADMIN FUNDS
ALL 870030
\.
RAILROAD CROSSING ADVANCE WARNING SIGNS -- STATEWIDE
RR XING / TRAFFIC PROJECT MILEAGE : .00 -.EXIST. LANES:: 0 /PROPOSED LANES: 0 MANAGER: W HESTER
CONG DIST, 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ALL 870040
11 COVERED BRIDGES IN VARIOUS LOCATIONS STATEWIDE BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER:
, CON~ DIST, 10 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ALL 870050
GEORGIA DEPT. OF TRANS. HIGHWAY SIGNS MANAGEMENT SYSTEM SPECIAL STUDIES/ OTHER PROJECT MILEAGE :;.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
200
FED SHARE$ 180
GA. SHARE$
20
0TH SHARE$
PE 1994 $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
50
0
1000 800200
PE 1994
$
225
ROW NONE $
0
CONST NONE
$
0
I
,,....
. ,,
.
ia'
ffl!l1!IJ!!I
- -., ,. ~. ~
~
~
~
~
~!'.ll
a?X!~~~
~~
t............,,
/';-;-:"=:~~
~\'.~~
~
~
'
..r.:.:-:-;,:;:
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 11
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
----------------------------------------------------------------------------------------------------------------------------------
ATKINSON SR 31@ UNNAMED CRK
PE 1990 UNDERWAY
421440 REPLACEMENT OF THE EXISTING BRIDGES(S) .- NO ADDED LANES.
CONG DIST. 8
ROW 1991
UNDERWAY
PROJECT MILEAGE : .17
GRIP PROJECT
CONST
AFTER 96
MANAGER: UNKNOWN
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
(.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 12
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------------------------------------------------------------------------------------------------. ----------------------
BACON SR-32/ALMA@ HURRICANE CREEK
PE 1983 UNDERWAY
520910 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
CONG DIST. 1
ROW NONE
$
0
PROJECT MILEAGE : .65
CONST 1995
$ 1661
MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 1329
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
332
522125 IS AN ASSOCIATED PROJECT.
0TH SHARE $
BACON 522120
SR 32, EB MP 13.4-14.6; REALIGN SR 203@ SR 32 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.20 MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1994
$
12
CONST 1995
$
450
FED SHARE $ 360
GA. SHARE $
90
0TH SHARE $
BACON 522125
SR 32/ALMA FROM SR 4/PIERCE ST NE TO CR 323 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.10 MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 520910 IS AN ASSOCIATED PROJECT.
PE 1992
UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$ 1997
FED SHARE $ 1598
GA. SHARE $
399
0TH SHARE $
IV
,- .
, ~
, .
-
l!I!!!!!!!!
-~ ::; .
~
l!l!l!ilJi!!
~
~
l!!!l!!!!!
~
!!Mi~
I!!'-*-~
rrw.:;&i"~
~
~
.c:oii!'4 '
~...,"-'~!,.':1
!',f. ~-f''t"
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 13
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BALDWIN SR 22/24 RELOC FM CR 171 EAST TO SR 22/24 SPLIT
PE 1995 $ 168
222180 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
CONG DIST. 11
ROW
AFTER 96
PROJECT MILEAGE : 3.10
CONST
AFTER 96
MANAGER: H. ASHMORE
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
BALDWIN 231280
SR 22@ SR 29/US 441 IN MILLEDGEVILLE TURN LANES/ TRAFFIC PROJECT MILEAGE : ,28 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH
BALDWIN 241670
REMOVAL OF GA RAILROAD BRIDGE OVER US 441 BUSINESS
BRIDGES/ TRAFFIC PROJECT MILEAGE : .25 MANAGER: D. GRIFFITH
BALDWIN 270950
PRESERVATION OF HISTORIC DISTRICT IN MILLEDGEVILLE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 11 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 11 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 11 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
363
FED SHARE$
327
GA, SHARE$
36
0TH SHARE$
PE 1993 UNDERWAY
ROW 1994
$
2
CONST 1995 $ 142
FED SHARE $ 128
GA. SHARE $
14
0TH SHARE $
PE 1994 $
21
ROW 1994 $
44
CONST 1995 $
74
FED SHARE$
59
GA. SHARE$
13
0TH SHARE$
28
(
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 14
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
B-A-N-K-S-----C-O-U-N-T-Y--O--PE-R-A-T-E-D--P-U--B-L-IC---T-R-A-N-S-IT---S-E-R-V-IC--E------------------------------------------------------------------------------------
1Bl003 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 10
FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
OPERATING 1994 $
22
FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
9
BANKS 1Bl004
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1995 $
22
FUND SOURCE: RURAL TRANSIT
FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
9
BANKS 1Bl005
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH
CONG DIST. 10
c-
FUND SOURCE: RURAL TRANSIT
OPERATING 1996 $
24
FED SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
10
BANKS
I-85 SIGN MOD FM DEK CL TO SC STATE LN .. GWIN/JACKS/BAR/FRANK
PE NONE $
0
11044Y SIGNING/ MAINTENANCE
CONG DIST. 10 & 6
ROW NONE $
0
PROJECT MILEAGE : 76.00 ~EXIST.LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
110440 IS AN ASSOCIATED PROJECT.
0TH SHARE$
BANKS 1310.90
SR 51 FM THE SCHOOL NE TO SR 15/US 441
TURN LANES/ TRAFFIC. PROJECT MILEAGE : .43 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS
CONG DIST. 10
FUND.SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE . $
0
ROW 1994 $
1
CONST 1995 $ 190
FED SHARE$ 171
GA. - .SHARE $
1
0TH SHARE$
18
BANKS 141630
CR 132/LULA@ NORFOLK SOUTHERN RR/ID 717648N
RR XING. / TRAFFIC
PROJECT MILEAGE : .00 - EXIST, LANES: 2 /PROPOSED LANES: 2
MANAGER: W HESTER
.
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE ROW NONE CONST
$
0
$
0
AFTER 96
'
II
(I'(''
!J
"' ,..
l!l!l!!ll!!!!!l
-
l!!!!l!!l!!!! 11!!!!!!!!1!1
:.
~
~
~
~
~
~.,
~
~
ft.";!~~
/1:i::~j
r::::,:
.~~ '
. . 1--:-,.,........
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 15
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-BA-R-R-O-W-----I--8-5--S-I-G-N--M--OD---FM---D-E-R--C-L--T-O--S-C--S-T-A-T-E--L-N-.-.-JA--C-K-/B-A--N-K-S-/G-W-.N-/-F-R-A-N-K---------------------------------------------PE---N-O-N-E-----$------0
11044X SIGNING/ MAINTENANCE
CONG DIST. 10 & 6
ROW NONE $
0
PROJECT MILEAGE : 76,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
110440 IS AN ASSOCIATED PROJECT,
0TH SHARE$
BARROW 121730
WINDER BYP FM SR 8@ SR 11 NEARS CL NE TO SR 53@ SR 11 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 2.60 MANAGER: J. GRAYBEAL (M)
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
187
AFTER 96
BARROW 132220
SR 211@ CR 326/MP 17.5l;CR 61/MP 21.05;CHATEAU ELAN/MP 22.0 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. PROJECT MILEAGE : 1.26 MANAGER: L. OWENS
BARROW 170725
CR 75/FRED KILCREASE RD@ APALACHEE RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE : .15 MANAGER: L. OWENS
BARROW 170726
CR 228/ROSS RD@ BEECH CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .15 MANAGER: L, OWENS
BARROW 170728
CR 72/BROWNS BRIDGE RD@ APALACHEE RIVER SW OF AUBURN REPLACEMENT OF THE EXISTING BRIDGES(S), FROM 1 TO 2 LANES.
PROJECT MILEAGE : .20 MANAGER:
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY A!)MIN FUNDS
PE 1992 UNDERWAY
ROW 1995 $ 110
CONST 1996 $ 725
FED SHARE$
580
GA, SHARE$ 145
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1994
$
425
FED SHARE$
340
GA. SHARE$
85
0TH SHARE$
PE 1993 UNDERWAY ..
ROW LOCL
CONST 1994 $ 262
FED SHARE$
210
GA. SHARE$
52
0TH SHARE$
PE 1994 $
6
ROW LOCL
CONST 1996 $ 200
FED SHARE$
160
.GA, SHARE $
40
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 16
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY P, I.NO.
DESCRIPTION PROJECT DATA
BARTOW COUNTY OPERATED PUBLIC TRANSIT SERVICE
FISCAL
COST
-------------------------CO--M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
6B1328 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 7
FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $ 101
FED SHARE$
56
GA. SHARE$
0TH SHARE$
46
BARTOW 6B1329
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ 106
FED SHARE$
58
GA. SHARE$
0TH SHARE$
48
BARTOW 6B1330
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
110
FED SHARE$
61
GA. SHARE$
0TH SHARE$
50
BARTOW 6C2328
ONE CONVERSION VAN AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1994
$
48
FUND SOURCE: RURAL TRANSIT
FED SHARE$
38
FEDERAL TRANSIT ADMIN .FUNDS
. GA. SHARE $
5
0TH SHARE$
5
BARTOW 6C2329
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW
MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS
CAPITAL 1995
$
32
FED SHARE $",
26
GA. SHARE$
3
0TH SHARE$
3
BARTOW 6C2330
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW
MANAGER: STEVE KISH
CONG.DIST. 7
CAPITAL 1996
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
2
0TH SHARE$
2
BARTOW 610950
I-75 MILL AND INLAY FM US 411/SR61 TO SR 140
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 7
PROJECT MILEAGE : 12.10 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
.
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1994 $ 2220
FED SHARE $ 1998
GA. SHARE $ 222
0TH SHARE $
....
,.,
..
' f
-
-
- -. ~
~
--
~
~
~
!).!~
Fi~.
M.'&l
~(\
j17:t,f~
c.:,:'el
~..
... f:-,.;..<.:--.-,1
i::
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 17
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O--. ------.--------P-R--O-JE-C-T---D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BARTOW I-75 AT SR 20
PE 1994' $
20
610960 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 7
ROW NONE $
0
PROJECT MILEAGE : .00
CONST 1995
$
233
MANAGER:
FUND SOURCE: I-STATE MAINT.
FED SHARE$ 210
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
23
0TH SHARE$
BARTOW 620832
SR 61@ ETOWAH RIVER REPLACEMENT OF THE EXISTING BRIDGES($). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .63 MANAGER: M. REYNOLDS
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621255 IS AN ASSOCIATED PROJECT.
PE NONE ROW 1988 CONST
$
0
UNDERWAY
AFTER 96
BARTOW 620833
SR 61@ TWO ETOWAH RIVER OVERFLOWS REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .36 MANAGER: M. REYNOLDS
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
621255 rs AN ASSOCIATED PROJECT.
PE 1996 ROW NONE CONST
$
10
$
0
AFTER 96
BARTOW 621130
SR 113: BRIDGE & APPROACHES OVER HILLS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .30 MANAGER: M GANNAWAY (M)
CONG DIST. 7
. FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621430 IS AN ASSOCIATED PROJECT .
PE 1988 ROW NONE CONST
UNDERWAY
$
0
AFTER96
BARTOW 621250
SR 61/CARTERSVILLE FM GILMER ST TO SR 20/INCL 1-WAY PAIR RECONSTRUCTION & WIDENING FROM 3 LANES TO 5 LANES. PROJECT MILEAGE : 2.30 MANAGER: BILL MCVEY (M)
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BARTOW 621255
SR 61/CARTERSVILLE FM CR 533 NORTH TO HENDERSON DRIVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES,
PROJECT MILEAGE : 2.61 MANAGER: M. REYNOLDS (M)
BARTOW 621350
SR 20 FM SR 61 TO I-75 (INCL INTCH W/SR 61 & US 41) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.47 MANAGER: BILL MCVEY (M)
CONG DIST. 7FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 620832 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
UNDERWAY AFTER 96 AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 18
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A-----------------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BARTOW SR 113 RELOC FM PRESENT SR 113 TO CR 636;THENCE TO I-75
PE 1995
$ 184
621410 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
coNG DIST. 7
ROW
AFTER 96
PROJECT MILEAGE : 7.70 MANAGER: M GANNAWAY (M)
FUND SOURCE: SURFACE TRANSPORT,
CONST
AFTER 96
FEDERAL HIGHWAY ADMIN FUNDS
BARTOW 621430
SR 113 FM S/TAYLORSVILLE CL NE TO CR 31/STILESBORO/POLK RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE i 4,57
MANAGER: M GANNAWAY (M)
,_.
BARTOW 621435
SR 113@ DRY CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .16 MANAGER: M GANNAWAY (M)
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 621130 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL. HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 1954 AFTER 96
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
BARTOW 621440
SR 113 FM CR 31/STILESBORO NE TO SR 61 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4,39 MANAGER: M GANNAWAY (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$ 204 AFTER 96 AFTER 96
BARTOW 621445
SR 113@ RACCOON CREEK REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .17 MANAGER: M GANNAWAY (M)
CONG_ DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW NONE CONST
UNDERWAY
$
0
.AFTER 96
BARTOW 621500
SR 140 FM 0.3 MI W/OOTHKALOOGA CRK TO SR 3/US 41 RECONSTRUCTION& WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.00 MANAGER: M GANNAWAY (M)
BARTOW 621505
SR 140@ OOTHKALOOGA CRK & CSX RR REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .28 MANAGER: M GANNAWAY (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 621505 IS AN ASSOCIATED PROJECT.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621500.IS AN ASSOCIATED PROJECT,
PE 1992 ROW CONST
PE 1993 ROW NONE CONST
UNDERWAY AFTER 96 AFTER 96
UNDERWAY
$
0
AFTER 96
,.-
..
... ..
~
-~ ~ . ~--
~
~
~
~
~
~.,
~
~i~i~l,6,
~..:.....~~
~-',...,1/M
I<-:~
~
.- . i,,,,.-;-,,..,.,
r- . _.-._,
' -~.. .~>
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
Page 19
COUNTY
DESCRIPTION
FISCAL
COST
-P--, I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BARTOW SR 20/NEW ROUTE .. SEE FLOYD COUNTY_
PE 1993 UNDERWAY
62170X PRELIMINARY ENGINEERING/ NEW CONSTRUCTION
CONG DIST. 7
ROW NONE
$
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE $
0
MANAGER: UNKNOWN
FUND SOURCE: DEMONSTRATION PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
621700 IS AN ASSOCIATED PROJECT.
BARTOW 621760
STATE ROUTE 113@ RICHLAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: M GANNAWAY (M)
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW NONE
CONST
UNDERWAY
$
0
AFTER 96
BARTOW 621810
US 41-SR 3 FM MP 8.01 TO MP 9.02 IN THE CITY OF CARTERSVILLE INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : 1.01 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
BARTOW 631400
SR 3/US 41 FM POSTELLE TO MLK & MOCKINGBIRD IN CARTERSVILLE
INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : 1.63 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: BILL MCVEY
r.
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
BARTOW 641500
CR 459/LOCAL ACCESS RD@ CSX RAILROAD BRIDGES/ TRAFFIC PROJECT MILEAGE : .15 MANAGER: M. REYNOLDS
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
17
ROW 1995 $
10
CONST 1996 $ 578
FED SHARE$
578
GA. SHARE$
0TH SHARE$
PE 1994 UNDERWAY
ROW LOCL
CONST 1994 $ 785
FED SHARE$ 707
GA. SHARE$
79
0TH SHARE$
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
BARTOW 641870
SR 293@ GRASSDALE RD/CR 155 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .26 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: BILL MCVEY
BARTOW 670686
CR 114@ OOTHKALOOGA CRK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .17 MANAGER: BILL MCVEY
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1994
$
70
CONST 1994 $ 170
FED SHARE$
136
GA. SHARE$
34
0TH SHARE$
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$
246
FED SHARE$
197
GA. SHARE$
49
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 20
PROJECT LISTING. BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BARTOW CR 204/NALLEY ROAD@ LITTLE PINE LOG CREEK 7.2 MIN OF WHITE
PE 1994 $
10
670688 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
CONG DIST, 7
ROW LOCL
PROJECT MILEAGE : .21
CONST 1996
$
387
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
310
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
77
0TH SHARE$
BARTOW 670910
CARTERSVILLE STREETSCAPE MASTER PLAN; PED/BIKE PATHS LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST, 7
FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
ROW NONE
$
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
144 0
1106 885 29 250
BARTOW 72169X
N,MARS HILL EXT FM SR 3/COBB PKWY TO I-75/BARTOW COUNTY
UNKNOWN/ UNKNOWN PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. SMITH
r .
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 721690 IS_AN ASSOCIATED PROJECT.
PE 1992 ROW CONST
UNDERWAY
AFTER 96 AFTER 96
,.
,, ,
. '
~
~
l!!!!J!!!!I! ... ~
~
~
~
~
l!'J,.~
~/L~
t!fS.:::.~
l?.'[:'i'.,.U~l
:-::.:.:;~::.:~:
~f:t,',lf
r.1'1--'~
t. ~ ' . !
..
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 21
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BEN HILL SR 90@ ALAPAHA RIVER/ALSO TURNER CO
PE 1992
UNDERWAY
431040 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
CONG DIST. 8
ROW 1994
$
1
PROJECT MILEAGE : 1.00
CONST 1995
$
718
MANAGER: J. LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
574
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 144
0TH SHARE$
BEN HILL SR 11 FM C&G @ BUSH ST, FITZGERALD TO C&G IN ABBE' LE .. WILCOX
431360 SHOULDER WORK/ MAINTENANCE PROJECT MILEAGE : 20.06 -.EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
345
FED SHARE$
276
GA. SHARE$
69
0TH SHARE$
BEN HILL SR 107/US 319 OVER STURGEON CREEK NEAR CR 5
442580 REPLACEMENT OF THE.EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00
.
MANAGER:
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
10
$
1
AFTER 96
BEN HILL SR 90 OVER ALAPAHA RIVER OVERFLOW 442590 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:
BEN HILL TURN LANES ON ROANOKE & MERRIMAC DRIVES IN FITZGERALD 450360 TURN LANES/ TRAFFIC
PROJECT MILEAGE : 1.60 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: J. LINDSEY
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8. FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
5
ROW 1995 $
1
CONST 1996
$
170
FED SHARE$
136
GA. SHARE$
34
0TH SHARE$
PE 1992 ROW LOCL CONST
UNDERWAY, AFTER 96
BEN HILL EVERGREEN CEMETERY ROAD OVER TURKEY CREEK IN FITZGERALD 450420 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER:
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
10
ROW LOCL
CONST 1996
$
180
FED SHARE$
144
GA. SHARE $
36
0TH SHARE$
,_.
j
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 22
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
B-P-IB-.B-I.-N-O--. -E-L-D-E-R-L-Y--A-N-D--D-I-SP-AR-BO-L-JEE-DC-T-V-D-EA-HT-I.CA-L-E-S--A-N-D---EQ--U-IP-M-E-N--T-----------------------------C-O-M-M-E-N-T-S-----. ----------------------Y-E-A-R--------E-S-T-S--
3V1010 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 8 & 2
FUNDS RECIPIENT: AGENCIES IN BIBB MPO AREA
CAPITAL 1994
$
38
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
30
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
BIBB 3Vl011
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPI~NT: AGENCIES IN BIBB MPO AREA MANAGER: STEVE KISH
CONG DIST. 9 & 2
CAPITAL 1995
$
39
FUND SOURCE: ELDERLY & DISABLED FUND FED -SHARE$
31
FEDERAL TRANSIT ADMIN FUNDS
.GA ..SHARE $
. 4,
0TH SHARE$
4
BIBB 3V1012
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIE IN BIBB MPO AREA, MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1996
$
41
FUND. SOURCE: ELDERLY & DISABLED FUND FED SHARE$
33
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
BIBB 310713
I-75@ I-16; SOU RR; ARKWRIGHT RD; US 23 & SR 87; & 31Y713 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 7.30. MANAGER: H. ASHMORE
MACON TIP f. 230-TSM. CONG DIST. ~
FUND SOURCE: NAT'L HIGHWAY FEDERAL .HIGHWAY ADMIN FUNDS 31Y710 IS AN ASSOCIATED PROJECT.
PE NONE $
ROW NONE $
CONST 1994
$;
FED SHARE $
GA. SHARE $.
0TH SHARE$
0 0 23_85
1908 477
BIBB 310980
I-16@ SR 540 INCL I-16 ML BR@ SAL RR; 1 STREAM & 1 RIVER INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .97 - EXIST, LANES: 2 /PROPOSED LANES: 4
MANAGER: BEN BUCHAN (M)
MACON TIP f llOC-MC CONG DIST. 8 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1987 UNDERWAY ROW 1989 UNDERWAY CONST 1996 $ 22468-
FED SHARE$ 17974 GA. SHARE $. 4494 0TH SHARE$
BIBB 311000
I-16 IN MACON, INTER MOD@ SR 11, SR 22, SR 87
INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : 1.27 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: BEN BUCHAN (M)
.
MACON TIP I 180-MC
CONG DIST. 2:
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1987 UNDERWAY
ROW 1995 $ 320
CONST 1996 $ 3800
FED SHARE$ 3420
GA .. SHARE $
380
0TH SHARE$
BIBB 311130
I-16@ OCMULGEE RVR,WALNUT CK, OCMULGEE RVR OFLW
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : . 01 MANAGER: BEN BUCHAN (M)
MACON TIP I 270-TSM
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDER.AL HIGHWAY ADMIN FUNDS
PE 1986 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
\
'' "'.!Ii
. p
i
l!!J!!l!!!I!!!
I!!'.!!!'!!!!!!
. ~
~
~
~
ffi!!I~~
~
,. ~ .
~
B3!?::.t,
~as
~':'-"~~;
f:.~. .~:~~
I~~
,.:..;"""';'
. '
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 23
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
B--IB-B-------I--7-5/-M--A-C-O-N--F-M--P-I-E-R-C-E--A-V--E--EA--ST---TO---I--1-6------------------------------M-A-C-O-N--T-I-P--I--2-20-1-\.--M--C---------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
311400 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
CONG DIST. 8 & 2
ROW
AFTER 96
PROJECT MILEAGE : 1.62
CONST
AFTER 96
MANAGER: BEN BUCHAN (M)
FOND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
BIBB
I-16 FM I-75 EAST TO SR 11
, .
311410 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10
MANAGER: BEN BUCHAN (M)
MACON TIP I 190A-MC
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BIBB 311415
I-16/MACON FM SR 11 EAST TO SR 87 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10 MANAGER: BEN BUCHAN (M)
MACON TIP I 190B-MC
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
BIBB 311460
I-75@ HARTLEY BRIDGE RD/CR 740 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: BEN BUCHAN (M)
MACON TIP I 271-TSM
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 5000 AFTER 96
BIBB 311530
I-16@ SR 87/MLK JR. BLVD IN MACON LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E.. LAWS
BIBB 311560
I-75@ HARDEMAN AVE & FORSYTH ST
TURN LANES/ TRAFFIC PROJECT MILEAGE :- .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BEN BUCHAN
MACON TIP I 250-TSM
CONG DIST. 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP I 220-TSM
CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
70
FED SHARE$
56
GA. SHAAE $
14
0TH SHARE$
PE 1994 ROW 1995 CONST
UNDERWAY
$
190
AFTER 96
BIBB 311580
I-475 AT REST AREA I 19, MP 7.7NB
REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1994
$ 2000
FED SHARE $ 1800
GA. SHARE $
200
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 24
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
B--IB-B-------I--4-7-5--F-M---I--7-5--T-O--S--R--1-9-/-U-S---41-/-M-O-N-R-O-E-----------------------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY
311590 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CO~G DIST. 8 & 3
ROW NONE
$
0
PROJECT MILEAGE : 14.00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: ..L. SEABROOK
.
FUND SOURCE: I-STATE MAINT.
CONST _1994
$ 10000
FED SHARE $ 9000
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1000
0TH SHARE $.
BIBB 311685
I-16 FM JCT I-75 TO TWIGGS/BLECKLEY CL ... TWIGGS
I
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 8
PROJECT MILEAGE: 31.70 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
.
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
31168Z IS AN ASSOCIATED PROJECT.
PE NONE
$
ROW 1994
$
CONST 1994
$
FED SHARE$
,GA. SHARE$
0TH SHARE_ $
0
0 4706 4235
471
BIBB 311750
NAPIER AVE OVER I-75; I-75 OVER RAMP TO SR 87 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:
CONG DIST.8 & 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE_
ROW _CONST
AFTER 96 .AFTER 96
AFTER 96
BIBB 31Y713
I-75@ 5 BRIDGES; FOR IM FUNDING; SEE 310713 UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
BIBB 322000
SR 87/RIVERSIDE DR/MACON FM HALL RD TO NORTHSIDE DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.29 MANAGER: ~EN BUCHAN
BIBB 322005
SR 87/RIVERSIDE DR/MACON@ SABBATH CREEK REHAB. OF-THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN
BIBB 33175X
HOUSTON RD FM SR 11 TO WALDEN/SARDIS;SEE HOUSTON SPLIT UA $ UNKNOWN/ UNKNOWN PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 230-MC CONG DIST. 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL_HIGHWAY ADMIN FUNDS 322005 IS AN ASSOCIATED PROJECT.
MACON TIP f 230-MC(2) CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322000 IS AN ASSOCIATED PROJECT.
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 331750 IS AN ASSOCIATED PROJECT,
PE NONE $
0
ROW NONE
$
0
CONST 1994
$: 300
FED SHARE$
270
GA .. SHARE $.
30
0TH SHARE$
PE 1992 UNDERWAY
ROW 1995 $ 250
CONST 1996 $ 3023
FED SHARE $ 2418
. GA. SHARE $
605
0TH SHARE $
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1996
$
320
FED SHARE $
256
GA. SHARE $
64
0TH SHARE $
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1996
$
277
FED SHARE $
222
GA. SHARE $
55
0TH SHARE $
,,
~~
'4
..
,, '
-: ~
!'!!ffllJ!9
~ !R!!'8 Mi.@ ~ ~ ~ ~ ~ ~i.511 ~:l!tM = ~ " t:.~~~ tee:-'::::, ~~}-';l ~.;..~
,-,.
"'
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 25
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------ BIBB
MILLERFIELD RD/MACON@ JEFFERSONVILLE RD
. MACON T-IP---f --10-0---T-S-M----------------------PE---N-O-N-E-----$------0
342080 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 2
ROW LOCL
PROJECT MILEAGE : .40 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
156
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
FED SHARE$
140
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
16
0TH SHARE$
BIBB 350520
WID & RCST FOREST HILL RD IN MACON: OVERLOOK TO WIMBISH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .60 MANAGER: D. CHURCH
MACON TIP f 141-MC CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1984 ROW LOCL CONST
UNDERWAY AFTER 96
BIBB 350560
SR 247/US 41/PIO NONO AVE FM I-75 TO SR 49/US 129/ RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 1.30 MANAGER: D. CHURCH
r.
BIBB 350760
CR 79/NORTHSIDE DR FM FOREST HILL RD TO SR 87/& SABBATH CK RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.60 MANAGER: BEN BUCHAN
BIBB 350820
HOUSTON RD FM WALDEN/SARDIS CH RDS TO SR 11 MINOR WIDEN & RESURF / RECST. OR REHAB. PROJECT MILEAGE : 3.20 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: GORDON BROWN(M)
BIBB 350960
SR 74 FM W/I-475 TO COLUMBUS RD (INCL BR OVER I-475) TURN LANES/ TRAFFIC PROJECT MILEAGE : 1.30 - EXIST. LANES: 4 /PROPOSED LANES:. 5 MANAGER: BEN BUCHAN (M)
BIBB 371030
LANDSCAPING OF CIVIC SQUARE FOR PARK IN MACON LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOS.ED LANES: 0
MANAGER: CORA COOK
MACON TIP f 140-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 210-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 150-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 339-MC CONG DIST. 8 & 2 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 & 8 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1987
UNDERWAY
CONST 1994
$ 2928
FED SHARE $ 2342
GA. SHARE $ 586
0TH SHARE $
PE 1992 UNDERWAY ROW LOCL
CONST 1995. $ 3811 FED SHARE$ 3049 GA. SHARE$ 762 0TH SHARE$
PE 1992
UNDERWAY
ROW LOCL
CONST 1995
$
757
FED SHARE$
606
GA. SHARE$ 151
0TH SHARE$
PE 1994
$
ROW 1995 $
CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
35 110 1238 1114 124
PE 1994
$
60
ROW LOCL
CONST 1994
$
240
FED SHARE$
192
GA. SHARE$
12
0TH SHARE$
60
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 26
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
B-P-IB-.BI-.-N-O--. -C-A--LL--B-O-X--ES--O-N--P-IR--1O-6-JE-CF-RT-O-MD-A--TSRA---8-7-/B-I-B-B---TO---I--9-5-/C-H-A--T-H-A-M-----------------------C-O-M-M-E-N-T-S--------------------------P-EY-E-A1-R9-9-4-----$-E-S-T-S-.-so
811030 MISCELLANEOUS IMPROVEMENTS/ NEW CONSTRUCTION
CONG DIST. 1 & 8
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1996 $ 1660
MANAGER:
.
FUND SOURCE: I-STATE MAINT.
FED SHARE$ 1494
FEDERAL HIGHWAY ADMIN FUNDS
GA, SHARE$ 166
0TH SHARE$
r_-
,.
1)1
<!'
,
'
. '
l!!!l!!!!!l
~
. l!Jll!!l!!!I ~
~
~
~
~
!,I..~
~~
= ~
~!Kt~
\~~~~-=~
w.~::~t,
~!~l
~~
'1
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
P~ge 27
COUNTY
DESCRIPTION
FISCAL
COST
-- P.I.NO.
PROJECT DATA
B--L-EC--K-LEY---CO-U--N-TY---O-P-ER-A--T-ED- -- PUBLIC--T-R-A-N-S-I-T--S-ERVICE
COMMENTS
YEAR
ESTS
----------------------------------------------------------------------------------
2B1088 TRANSIT FACILITIES/ OPERATIONS
. CONG DIST. 8
FUNDSRECIPIENT: BLECKLEY
OPERATING 1994 $
52
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
31
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
21
BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 281089 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1995 $
54
FUND SOURCE: RURAL TRANSIT
FED SHARE$
32
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
22
BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 281090 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY .
MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1996 $
58
FUND SOURCE: RURAL TRANSIT
FED SHARE$
34
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
24
BLECKLEY ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
2C2088 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH
CONG DIST. 8
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2089 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH
CONG DIST. 8
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2090 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT
CAPITAL 1996
$
21
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
BLECKLEY I-16 FROM TWIGGS CL TO US 441 IN LAURENS COUNTY
210670 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 8
PROJECT MILEAGE : 18.30 - EXIST. LANES: 4 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
4517 4065
452
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
P.age 28
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
B-L-E-C-K-L-E-Y--S-R--8-7-/-U-S--2-3--I-N--C-O-C-H--R-A-N-@----SO-U-T-H-E-R-N--R-R----------------------------------------------------'
-----~
----------Y-E-A-R---------E-S-T-S-PE 1985 UNDERWAY
221130 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 8
ROW 1988 UNDERWAY
PROJECT MILEAGE : .30
'CONST 1994
$ 1006
MANAGER: D. GRIFF~TH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
805
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
201
0TH SHARE $
BLECKLEY SR 87 FM S/BOLLINGER CRK-BLECKLEY TO SR 96/TWIGGS 222070 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 7. 79 MANAGER: H. ASHMORE(M)
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL "IGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST.
UNDERWAY
$
116
AFTER 96
BLECKLEY SR 87 FM SR 257 NW TO THE COCHRAN BYPASS 222360 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.50 MANAGER: H. ASHMORE(M)
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$
90
AFTER 96
AFTER 96
BLECKLEY SR 112: OVER BOLLINGER CREEK 242160 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:
CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW CONST
$
10
AFTER 96
AFTER 96
.,
!Y
r_-
"
,, r
j
,. F!M!e !!Ml! ,, ~ ~ ~ ~ ffi!!1 ~ e.ftttl ~~ ~ ~ ~~~ ~?~"."~ !'.!r1;-!~.i ~
. ,,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-.1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 29
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
BRANTLEY CR 11@ HILL CREEK WEST OF HOBOKEN
--------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PE 1994
$
4
570925 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 1
ROW LOCL
PROJECT MILEAGE : .20
CONST 1996
$
144
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
115
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
29
0TH SHARE$
! .
I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE-TRANSPORTATION IMPROVEMENTS PROGRAM
Page 30
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BROOKS SR 94 FM W/CR 276 TOE OF WITHLACOOCHEE RVR/LOWNDES
PE 1992
UNDERWAY
421720 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 2
ROW
AFTER 96
PROJECT MILEAGE : 1.60
CONST
AFTER 96
MANAGER: K FULBRIGHT (M)
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
421722 IS AN ASSOCIATED PROJECT.
BROOKS 421722
SR 94@ LITTLE RVR;WITHLACOOCHEE RVR & OFLW/ALSO LOWNDES REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .20 MANAGER: K FULBRIGHT (M)
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421720 IS AN ASSOCIATED PROJECT.
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
BROOKS 421990
SR 94 NB FM MP 10.0-11.S;SB MP 1.6-3.1 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.00 MANAGER: J. LINDSEY
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
864
FED SHARE$
691
GA. SHARE$
173
0TH SHARE$
BROOKS 431420
SR 33 AT NORFOLK SOUTHERN RAILROAD ... f723472U
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER
CONG DIST. 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
75
FED SHARE$
68
GA. SHARE$
8
0TH SHARE$
BROOKS 470870
CR 268@ PISCOLA CREEK & OVERFLOW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .53 MANAGER: J. LINDSEY
CONG DIST. 2
FUND-SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 853 FED SHARE$ 682 GA. SHARE$ 171 0TH SHARE$
<.
:;
,.
1,
,, '
f
~
-~ ~
,, im= ~
~
~
~ ~
~ ~
~[~~
~ ==
~~m;~
!,tt:t:~
~~
tti~-:~
f:?;<:-~
Vi''-'~
el .....))
. ,, f'\',.,......
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 31
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BRYAN COUNTY OPERATED PUBLIC TRANSIT SERVICE
5Bl283 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 1
FUNDS RECIPIENT: BRYAN
OPERATING 1994
$
86
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
50
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
36
BRYAN 5B1284
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH
BRYAN 5B1285
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH
CONG DIST. 1
OPERATING 1995 $
91
FUND SOURCE: RURAL TRANSIT
FED SHARE$
53
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
38
CONG DIST. 1
OPERATING 1996
$
95
FUND SOURCE: RURAL TRANSIT
FED SHARE$
55
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
40
BRYAN 5C2283
ONE CONVERSION VAN AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH
CONG DIST. 1
CAPITAL 1994
$
48
FUND SOURCE: RURAL TRANSIT
FED SHARE$
38
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
OTH.SHARE $
5
BRYAN 5C2284
ONE CONVERSION VAN WITH LIFT
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH
CONG DIST. 1
CAPITAL 1995
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
BRYAN 51115X
I-95 FM JERICO RVR TO US 17 ... SEE LIBERTY CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 511150 IS AN ASSOCIATED PROJECT.
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
BRYAN 511190
I-16 WIDEN 10 BRIDGES@ MP 138.3; 145.9; 146.6; 146.8; 147.2 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
ROW NONE $
CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
75
0
2502 2252
250
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 32
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BRYAN I-95 FM 0.8 MIS/US 17 TO OGEECHEE RVR; FOR IM FUNDS
PE NONE $
0
51Y020 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
CONG DIST. 1
ROW NONE $
0
PROJECT MILEAGE : 5.40
CONST 1994 $ 5761
MANAGER:
FUND SOURCE: I-STATE MAINT.
FED SHARE$ 5185
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
576
0TH SHARE$
BRYAN 521750
US 17/RICHMOND HILL FM SR 144 N TO S/OGEECHEE RIVER OFLW BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.90
MANAGER: M. REYNOLDS
CONG DIST. 1
FUND SOURCE: SURF~CE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995 $ 3732
FED SHARE$ 2986
GA. SHARE$
746
0TH SHARE$
BRYAN 521755
WIDEN & NEW BRIDGE ON US 17@ OGEECHEE RIVER/ALSO CHATHAM CO
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : . 3 6 MANAGER: M.. REYNOLDS
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521750 IS AN ASSOCIATED PROJECT.
PE 1991
UNDERWAY
ROW NONE $
0
,CONST 1995 $ 2388
FED SHARE$ 1910
GA. SHARE$ 478
0TH SHARE$
BRYAN 521758
US 17/RICHMOND HILL FM 4-LN N/I-95 TON/SR 144/INCL NEW BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: M. REYNOLDS
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1992 UNDERWAY
CONST 1994
$ 5193
FED SHARE$ 4154
GA. SHARE$ 1039
0TH SHARE$
BRYAN 531130
SR 144/RICHMOND HILL FM CR 100 NW TO SR 25/US 17 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.57 MANAGER: M. REYNOLDS
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1990 UNDERWAY
CONST 1994
$ 1899
FED SHARE$ 1519
GA. SHARE$
369
0TH SHARE$
11
BRYAN 531220
SR 144/RICHMOND HILL FM WEST RAMPS@ I-95 EAST TO US 17 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.41 MANAGER: M; REYNOLDS
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994 $ 1643
FED SHARE$ 1314
GA. SHARE$
329
0TH SHARE$
BRYAN 532360
CR 90 FM OCEAN HWY/SR 25 TO PARK HILL RD/CR 154 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 6.92 MANAGER: PETE BLQ~KER.
CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$ 2525
FED SHARE$ 2020
GA. SHARE$
505
0TH SHARE$
.,, .~
,4
,, r
.....
~
I!!!!!!!!! ~ ~ ~ ~ ffif.!!fj !!JSJ,.6 ~ ~:S"i;~ ~~ ~!~~ ~;<-
~
~. .. f ... -,,..,
r?'""'~
~
I l
.r,-:,"'! '
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 33
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
BRYAN CR 90/BELFAST-KELLER RO OVER TIVOLI RIVER
PE 1994
$
9
532410 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
CONG DIST. 1
ROW LOCL
PROJECT MILEAGE : .20
CONST 1995
$
341
MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
273
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
68
0TH SHARE$
-----------:----------------------------------,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 34
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
BULLOCH COUNTY OPERATED PUBLIC TRANSIT SERVICE
5Bl518 TRANSIT PROJECTS/ OPERATIONS
CONG DIST. 1
FUNDS RECIPIENT: BULLOCH COUNTY
OPERATING 1994 $
41
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
17
BULLOCH 5Bl519
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH
CONG DIST, 1
OPERATING 1995 $
44
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
18
BULLOCH 5Bl520
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH
CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996 $ - 46
FED SHARE$
27
GA. SHARE$
0TH SHARE$
19
BULLOCH 5C2518
ONE CONVERSION VAN WITH LIFT AND MOBILE RADIO TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH
(_
BULLOCH 5C2519
TWO CONVERSION VANS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: BULLOCH COUNTY
MANAGER: STEVE KISH
CONG DIST. 1
FUND SOURCE: RURAL TRANSIT
CAPITAL 1994
$
32
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
CONG DIST, 1
CAPITAL 1995
$
58
FUND SOURCE: RURAL TRANSIT
FED SHARE$
46
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
6
0TH SHARE$
6
BULLOCH 521170
SR 73 W@ LOWER LOTTS CRK 6 MI SOUTH OF STATESBORO
BRIDGES/ OTHER PROJECT MILEAGE : ,30 MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
1
CONST 1995 $
96
FED SHARE $
77
GA. SHARE $
19
0TH SHARE $
BULLOCH 521270
SR 67 FM CR 248/585 NORTH TO 5-LN SECTION RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.40 MANAGER: PETE BLOCKER
CONG DIST. 1
"FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 521275 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1995 CONST
UNDERWAY
$
80
AFTER 96
_,, .,., -
,,
rf r
r
P!!!!!!
~
~ ~
-~
~
-
~
~
~
~
~
r,t'::"i;,"
,.~ . ...,j
~- -~.~. .. --!~,
~
~1 Ltt ,
;-.--,.,....,, iJ..
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-,1993 Page 35
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
--- -----------------
PROJECT--D--A-T-A--
- -----------------------------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
BULLOCH SR 67@ LITTLE LOTTS CRK
PE 1992
UNDERWAY
521275 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 1
ROW NONE
$
0
PROJECT MILEAGE : . 20
CONST
AFTER 96
MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
521270 IS AN ASSOCIATED PROJECT.
BULLOCH 521800
SR 73/US 301 FM PACKING HOUSE RD TO NORTH OF CR 445 & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.45 MANAGER: RAY METTS (M)
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BULLOCH 521970
SR 26/STATESBORO FM BRANNEN RD/CR 482 TO SR 67/73/US 301 RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : 1.72 MANAGER: RAY METTS (C/M)
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BULLOCH 522230
OLD SR 46@ BLACK CREEK 1.2 MI W/SR 26 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : . 50 MANAGER: PETE BLOCKER
BULLOCH 522465
SR 67@ WOODCOCK BRANCH & ZETTEROWER BRANCH REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .12 MANAGER: RAY METTS (C/M)
BULLOCH SR 26/US 80 EB MP 7.1-8.2; WB MP 8.1-9.3
522470 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 2.30
MANAGER: PETE BLOCKER
.
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 522460 IS AN ASSOCIATED PROJECT.
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW LOCL
CONST 1995 $ 859
FED SHARE$
687
GA. SHARE$
172
0TH SHARE$
PE 1992 ROW NONE CONST
UNDERWAY.
$
0
AFTER 96
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BULLOCH 522740
SR 26 AT ZETTERTOWER/STOCKYARD
TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
9
ROW 1995 $
10
CONST 1996
$
289
FED SHARE$ 289
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 36
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BULLOCH OLD.SR 46@ LITTLE LOTTS CK 11 MI SOUTH OF STATESBORO
PE 1993 UNDERWAY
531270 . REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 1
ROW LOCL
PROJECT MILEAGE : .22 MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
CONST 1995
$
575
.FED SHARE$
460
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
115
0TH SHARE$
BULLOCH 541950
SR 46 OVER LUKE SWAMP BRANCH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
10
$
1
AFTER 96
BULLOCH 550500
BRANNEN ST/GENTILLY RD FM SR 67 TO SR 26 INCL BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE: 1.47 MANAGER: PETE BLOCKER
BULLOCH 571010
STATESBORO GREENWAYS; LANDSCAPING.
BICYCLE/PED. FACILITY./ ENHANCEMENT
PROJECT MILEAGE : ;oo - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
r_
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1996 $ 847
FED SHARE$
678
GA. SHARE$
169
0TH SHARE$
PE LOCL
ROW 1994 $ 200
CONST 1994 $ 175
FED SHARE$ 140
GA. SHARE$
40
0TH SHARE$
75
~ V
.,
,., r
~
@m
~ ,, ~ '
~
~
~
~
~
~
&
~
~~
m 1:--:,:.:
~~~7,}
f~.'.L'tl.~
. ~ '
..f- ..., . <
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 37
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D--A-T-~----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BURKE COUNTY OPERATED PUBLIC TRANSIT SERVICE
2Bl093 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 11
FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH
OPERATING 1994 $
68
FUND SOURCE: RURAL TRANSIT
FED SHARE$
40
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
28
BURKE 2Bl094
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS. RECIPIENT: BURKE MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1995 $
71
FUND SOURCE: RURAL TRANSIT
FED SHARE$
42
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
29
BURKE 2Bl095
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1996 $
75
FUND SOURCE: RURAL TRANSIT
FED SHARE$
44
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
31
BURKE 2C2093
TWO STANDARD VANS
TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH.
CONG DIST. 11
CAPITAL 1994
$
40
FUND SOURCE: RURAL TRANSIT
FED SHARE$
32
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
BURKE 2C2094
TWO STANDARD VANS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1995
$
40
FUND SOURCE: RURAL TRANSIT
FED SHARE $'
32 ,
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
BURKE 2C2095
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH
CONG DIST. 11
.
FUND SOURCE: RURAL TRANSIT
CAPITAL 1996
$
32
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $.
3
0TH SHARE$
3
BURKE 221190
SR 56/SR 80 NE OF WAYNESBORO@ BRIER CRK BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .46 MANAGER: D. GRIFFITH
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$ 1876
FED SHARE $ 1501
GA. SHARE $ 375
0TH SHARE $
. \
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 38
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
p. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
B-U-R-K-E-----S-R---56--A-T--N-O--R-FO-L-K---SO-U-T-H-E-R-N---R-A-IL-R-O-A-D----.-f6-2-0-2-9-0-W-------------------------------------------------------------P-E--N-O-N-E-----$----- 0
231500 RR XING / TRAFFIC
CONG DIST. 11
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
75
MANAGER: W HESTER
FUND SOURCE: HWY. SAFETY
FED SHARE$
68
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
8
0TH SHARE$
BURKE 270840
79 AC MUNDY WETLAND MITIGATION SITE N/SR 56;NE OF WAYNESBORO RIGHTS-OF-WAY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1994
$
125
CONST 1994
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
BURKE 270890
BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 2
BRIDGE PAINTING /MAINTENANCE PROJECT MILEAGE: .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE $
.CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 1314 1051 263
(.
') .-i
1,.
,r .-
(4 t,
~
@I!!!!
!!!Ml i ~ .},.,.,,'-' !I
~
~
fflii
-,:,;,.c~
~
~
If
~~ J:::.'t:::~
j
;;:.:;:::=.~
/'.,;:~
~
~ i:,----\,.
~ , . . .
j ~-.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 39.
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ----------------P-R-O-J-E-C-T--D-A-T-A----------------------------~r-. ----------------C-O-M-M--EN-T-S----------------------------Y-EA-R---------E-S-T-S--
BUTTS I-75@ SR 36 FM 0.5 MI SW/I-75 TO 0.55 MI NE/I-75[& BRIDGE]
PE 1992 UNDERWAY
311380 INTERCHANGE/ RECST. OR REHAB.
CONG DIST. 11
ROW 1994 $ 10181
PROJECT MILEAGE : 1.10 - EXIST. LANES: 2 /PROPOSED LANES: 4
CONST 1995 $ 4577
MANAGER: H. ASHMORE (C)
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 4119
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
458
0TH SHARE $
BUTTS 311730
I-75: SR 36 OVER I-75 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
10
ROW 1995 $
1
CONST 1996 $ 169
FED SHARE$
152
GA. SHARE$
17
0TH SHARE$
BUTTS 322440
SR 36/JACKSON FM SR 16 TO CR 289/STARK RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .63 MANAGER: H. ASHMORE(M)
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BUTTS 332060
SR 16 OVER YELLOW WATER CREEK REPLACEMENT OF THE EXISTING BRIDGES{$). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
11
ROW 1995 $
1
CONST 1996 $ 741
FED SHARE$ 593
GA. SHARE$ 148
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 40
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-5PA-1M-1. -0ID.-7ENN0-O--. -R-I-E-9C-5O--N-FSM-TR-FU-L-CA-T-IOL-NI-NP-RE-&O-WT-JEO-ICD-T-HE-NA-DIRN-ARG-TIA-E-FTR-TO-SM-BL4UL-FAF-N-R-ES-D-/I-TNO-C--L6--BL-AR-N@-E-S-C.-ROOKED---R-V-R------C-O.NG--D-C-IO-SM-T-M. -E-1N-T-S-------------------------RO-PWE-Y-EA-N1R-O9-N9-E3-----U$-NE-DS-ETR-SW--AY0
PROJECT MILEAGE : 7. 22
l .
CONST 1995
$ 21500
MANAGER: J. GRAYBEAL
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$ 17200
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 4300
0TH SHARE$
CAMDEN 511075
I-95@ ST MARY'S RIVER@ FLA STATE LINE; & 51Y075 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .23 MANAGER: J. GRAYBEAL
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 4775
FED SHARE$ 3820
GA. SHARE$ 1438
0TH SHARE$ 2393
CAMDEN 511080
I-95 FM HARRIETT'S BLUFF RD TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 6.72 MANAGER: J. GRAYBEAL
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 10608
FED SHARE$ 8486
GA. SHARE$ 2122
0TH SHARE$
CAMDEN 511082
I-95 FM SR 25 SPUR TO CR 138/INCL BRIDGES RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 8.44 MANAGER: J. GRAYBEAL
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 21000
FED SHARE$ 16800
GA. SHARE $ 4200
0TH SHARE$
CAMDEN 511084
I-95 FM.CR 138 TO US 17/GLYNN & BR@ L SATILLA RVR .. GLYNN RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 6.76 MANAGER: J, GRAYBEAL .
BRUNSWICK TIP f BATS93-11 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL.HIGHWAY ADMIN FUNDS
PE 1996 $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
231 0
11568 9254 2314
CAMDEN 51Y075
I-95@ ST. MARY'S RV@ FLA STATE LINE; FOR IM$; SEE 511075 UNKNOWN/ UNKNOWN PROJECT MILEAGE .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 250
FED SHARE$ 225
GA. SHARE$
25
0TH SHARE$
CAMDEN 521910
SR 40@ SATURDAY PARK SC AND FOOD LION PLAZA INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE : .50 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 233
FED SHARE$- 186
GA. SHARE$
47
0TH SHARE $
,,.. ,.
l ~,
., .
' .
.... "'',''
~
l@B
. M@J ~ ,
~
~
= ~
~.!W!!
~L!fj
_,_1--- ~,w.iifj
..
"
.. ,;.,.;.-.,.,.,V,..<..,J..
:,~~r~~~:-:.::1
/,:~'.:~
Mt~
.. ,.~ ~,.:~-~
t:" .....,.._,
...
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 41
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-----------------------------------------------------------------------------------------------------------------------------------
CAMDEN SR 40 FM W/CR 61 TO SR 25/US 17
PE 1992 UNDERWAY
522080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 1
ROW
AFTER 96
PROJECT MILEAGE : 3.86
CONST
AFTER 96
MANAGER: H. ASHMORE (CM)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
CAMDEN 522690
SR 25/US 17 BRIDGE OVER ST. MARY'S RIVER /FLA STATE LINE
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .oo
MANAGER:
CAMDEN 532480
SR 40@ CR 81 AND I-95 SB ON/OFF RAMPS IN KINGSLAND INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .14 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: PETE BLOCKER
CAMDEN 571000
A STUDY OF BIKE/PEDESTRIAN PATHS IN COASTAL GEORGIA
PRELIMINARY ENGINEERING/ ENHANCEMENT PROJECT MILEAGE : .00 --EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
ROW 1994 $
CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
300 5
3050 2440
610
PE NONE
$
0
ROW LOCL
CONST 1994
$
275
FED SHARE$ 248
GA. SHARE$
28
0TH SHARE$
PE 1994
$
125
ROW NONE $
0
CONST NONE $
0
CAMDEN 571050
WOODBINE WATERFRONT BOARDWALK, SIDEWALK AND LANDSCAPING BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
59
ROW NONE $
0
CONST 1994
$
609
FED SHARE$
487
GA. SHARE$
12
0TH SHARE$
134
r
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P. I.NO.
PROJECT DATA
COMMENTS
C-A--R-R-O-LL---C-S--8-2-4-/S-T-E-W--A-R-T--S-T-/-C-A-R-R-O-L-L-T-O--N-@--C--U-R-T-IS---C-R-E-EK-------------------------------- - ---------- --
350660 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
CONG DIST. 7
PROJECT MILEAGE : .25
MANAGER: BILL MCVEY
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 42
FISCAL
COST
YEAR
,. ESTS
-------------------------
PE1991
UNDERWAY
ROW LOCL
CONST 1996 $ 303
FED SHARE$ 242
GA. SHARE$
61
0TH SHARE$
CARROLL 370725
CR 813/STATE LINE RD@ BIG INDIAN CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .30 MANAGER: BILL MCVEY
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1990 UNDERWAY
ROW LOCL
CONST 1994 $ 391
FED SHARE$ 313
GA. SHARE$
78
0TH SHARE$
CARROLL 61091X
I-20 SAFETY IMPROVEMENTS FRM ALA STATE LINE TO SR 61/HARALSO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
CARROLL 621770
CARROLLTON BYP FM 4-LN S/US 27A TO 4-LN ON BANKHEAD/& CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.78 MANAGER: RON BRAZIEL
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994 $
10
CONST 1995 $ 5865
FED SHARE$ 4692
GA. SHARE $. 1173
0TH SHARE$
CARROLL 621820
SR 61 AT SR 166 SIGNALS/ TRAFFIC PROJECT MILEAGE .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
7
ROW NONE $
0
CONST 1996 $ 231
FED SHARE$ 231
GA. SHARE $.
0TH SHARE$
CARROLL 631300
SR 166 FM CR 828/141 TO 4-LN/CARROLLTON .. INCL BRIDGES RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 5.65 MANAGER: RON BRAZIEL (M)
CONG DIST. 7
FUND. SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 5607 AFTER 96
CARROLL 631310
SR 166 FM SR 100/BOWOEN TO CR 828 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.10 MANAGER: RON BRAZIEL (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY
AFTER 96 AFTER 96
....
~ ..
'('l
fFM
~ ~
. ~ ~ "'
~
~
~!lll
~ ~
rn~
~,~
. . h~ ~i;'t,$\
~:~-:,::~
. ~;::\ ,~
I::;::~
i:r;;.,.;:~,
.. r.""l'~
..., .
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 43
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
-------------------------------------------------------------------------
------C-O-M-M-E-N-T-S---------------------------Y-E-A-R---------E-S-T-S--
CARROLL SR 16/US 27ALT FM SR 166 SE TOW OF STRIPLING CHAP RD/CR 24
PE 1993 UNDERWAY
631320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 7
ROW 1994 $ 1531
PROJECT MILEAGE : 1.65
CONST 1995 $ 4282
MANAGER: RON, BRAZIEL (C)
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 3426
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
856
0TH SHARE $
CARROLL 641890
N CARROLLTON BYP/SR 166 CONN. FM SR 1 TO SR 166 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.90 MANAGER: RON BRAZIEL (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$ 2429 AFTER 96
CARROLL 641910
SR 100 NB MP 5.30-4.28: SB MP 6.9-7.89 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.01 MANAGER: BILL MCVEY (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
26
$ 164
AFTER 96
CARROLL 650480
SR 8/US 78 AT CS 777 TURN LANES/ TRAFFIC PROJECT MILEAGE : .23 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER:
CARROLL 662500
CR 217/PLOWSHARE RD@ BUCK CREEK
.
1.
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25
MANAGER: BILL MCVEY
CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
9 0 . 165
149 17
PE 1992
UNDERWAY
ROW LOCL
CONST 1994 $ 339
FED SHARE$ 271
GA. SHARE$
68
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 44
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CATOOSA COUNTY OPERATED PUBLIC TRANSIT SERVICE
6B1333 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: CATOOSA
OPERATING 1994
$
88
MANAGER: STEVE KISH
FU~D SOURCE: RURAL TRANSIT
FED SHARE$
47
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
42
CATOOSA 6B1334
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
92
FUND SOURCE: RURAL TRANSIT
FED SHARE$
49
FEDERAL TRANSIT ADMIN FUNDS
"GA. SHARE$
0TH SHARE$
43
CATOOSA 6B1335
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS . FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1996 $
96
FUND SOURCE: RURAL TRANSIT
FED SHARE$
51
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
45
CATOOSA 6C2333
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1994
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL-TRANSIT ADMIN FUNDS
GA .. SHARE $
2
0TH SHARE$
2
CATOOSA 6C2334
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA
MANAGER: STEVE KISH
CATOOSA 6C2335
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA
MANAGER: STEVE KISH
CONG DIST. 9 FUND SOURCE:. RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
I
CONG DIST.. 9 FUND. SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CATOOSA 610720
PE & DESIGN FOR REPLACING WELCOME CENTER/I-75 N. OF RINGGOLD
REST AREA/ NEW CONSTRUCTION PROJECT MILEAGE : .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RON BRAZIEL (C)
CHATTANOOGA TIP I 3 CONG DIST. 9
FUND.SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CAPITAL 1995
$
29
FED SHARE $ 23
GA. SHARE$
3
0TH SHARE$
3
CAPITAL 1996
$
32
FED SHARE$
26
GA. SHARE $
3
0TH SHARE$
3
PE 1991 UNDERWAY
ROW 1994
$
672
CONST 1995 $ 4080
FED SHARE$ 3672
GA. SHARE$ 592
0TH SHARE $ 1000
.,
).r
' .
'll'
~
~
-~ .I le
~
~
ffl~
tt-~~
~IS
.. ~~~ ~,,
tl~!:.::~
~1.~~- ..... !J
t~._~,~~t~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
CATOOSA 610730
I-75@ SR 3/US 41
INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .35 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: EX PASSMORE
.
CHATTANOOGA TIP t 10
CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
..~~i
.,,,"'
16-Sep-1993 Page 45
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1995
$
120
CONST l!:196
$ 1720
FED SHARE $ 1548
GA. SHARE $
172
0TH SHARE $
CATOOSA 610800
I-75 FM SR 2 TO SR 146 RECONSTRUCTION & WIDENING FROM 6 LANES TO 8 LANES. PROJECT MILEAGE : 3.63 MANAGER: RAY METTS (M)
CHATTANOOGA TIP t 14
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$ 1000 AFTER 96
CATOOSA 610810
I-75 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 6 LANES TO 8 LANES. PROJECT MILEAGE : 1.42 MANAGER: RAY METTS (M)
CHATTANOOGA TIP t 13
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$ 500 AFTER 96
CATOOSA 610820
CO SYSTEM FM S/SCRUGGS RD TO TENNESSEE STATE LINE CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : .50 MANAGER: RAY METTS (M)
CHATTANOOGA TIP t 12
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS
PE 1993 ROW 1995 CONST
UNDERWAY $ 107 AFTER 96
CATOOSA 621530
SR 151 FM RELOC. HACKETT RD/CR 179 N TO I-75@ RINGGOLD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.30 MANAGER: M GANNAWAY (M)
CATOOSA 631190
CR 382/0LD SR 2@ SOUTH CHICKAMAUGA CRK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
PROJECT MILEAGE : .18 MANAGER: BILL MCVEY
CATOOSA 631420
SR 2/SR 3/US 41 AT SPARKS STREET IN NASHVILLE TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CHATTANOOGA TIP t 16
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y530 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP t 8
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 200 AFTER 96
PE 1992 UNDERWAY
ROW LOCL
CONST 1995 $ 303
FED SHARE$ 242
GA. SHARE$
61
0TH SHARE$
PE NONE $
0
ROW 1994
$
10
CONST 1995
$
173
FED SHARE$
173
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 46
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-AP-T-.IO-.O-N-SOA--. -S-R---1-4-6-@--C-R---80-;-P@R--O-CJE-SC--Tj4--7D-A;-T-A@--C-R--5-8-/--C-R--5-8-@---S-R--2--------------------C-H-A-T-T-A.NCOO-OM-G-MA-E-NT-TSI-P--f--6---------------------P-EY-E-A1-R9-9-3-----U-NE-DS-ETR-SW--AY
641820 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 9
ROW 1994
$
100
PROJECT MILEAGE: .SO - EXIST. LANES: 2 /PROPOSED LANES: 2
CONST 1995
$
741
MANAGER: BILL MCVEY
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $
593
FEDERAL HIGHWAY AOMIN FUNDS
GA. SHARE $
148
0TH SHARE $
CATOOSA 650430
SR 3/US 41 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .66 MANAGER: M GANNAWAY (M)
CHATTANOOGA TIP f 11 CONG oisT. 9
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY AOMIN FUNDS
PE 1993
ROW 1995 CONST
UNDERWAY
$ 165 AFTER 96
CATOOSA 650440
SR 146/CLOUO SPRINGS RO FM LAKEVIEW OR TO I-75/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2. 34 MANAGER: M GANNAWAY (M)
CATOOSA 650500
SR 146 AT CROSS STREET SIGNALS/ TRAFFIC: PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
CATOOSA 65Y440
SR 146/CLOUO SPGS RO FM LAKEVIEW TO I-75&BRIOGE .. SEE 650440 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES .. PROJECT MILEAGE: 2.34 MANAGER: M GANNAWAY
CATOOSA CR 259 SOUTH OF RINGGOLD@ LITTLE CHICKAMAUGA CRR 670710 .REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
.PROJECT MILEAGE : .14
MANAGER: BILL MCVEY
CHATTANOOGA TIP f 15 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 65Y440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP f 22 CONG [?IST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
CHATTANOOGA TIP f 15 CONG DIST. 9
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY AOMIN FUNDS 650440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP f 5 CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 1167 AFTER 96
PE NONE $
0
ROW NONE $
0
CONST 1996 $
64
_FED SHARE$
51
GA. SHARE$
_13
0TH SHARE$
PE 1992 ROW 1996 CONST.
UNDERWAY $ 544 AFTER 96
PE 1994 ROW LOCL CONST
$ 180 AFTER 96
CATOOSA 670810
HISTORIC RAIL DEPOT RESTORATION IN RINGGOLD MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY AOMIN FUNDS
PE LOCL
ROW LOCL
CONST 1995 $
35
FED SHARE$
28
GA. SHARE$
0TH SHARE$
7
,.
,,
I
...._ ,
~
~
~ ~
~
~
~
~
~
~
. ~..:Ji!
m:*\
'./.~....:-,--.,
~:;.-::.-::,::~
\:,';,:.,>~
.~~ r-~- "\-
'
'Ji.
COUNTY P,I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
16-Sep-1993 Page 47
FISCAL YEAR
COST ESTS
CHARLTON SR 852/FOLKSTON FM CR 138 NE ON NEW LOC TO US 1 521900 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .50 MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1994
$
256
CONST 1994
$ 1925
FED SHARE $ 1540
GA. SHARE $ 385
0TH SHARE $
CHARLTON SR 40 E/FOLKSTON: l)EB MP 1.65-3.0; 2)WB MP 3.7-5.2
522350 ADDITION OF A PASSIN.G LANE. PROJECT MILEAGE : 2.85 MANAGER: PETE BLOCKER
CO.NG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$
13
AFTER 96
CHARLTON SR 94@ ST MARYS RIVER AT FLORIDA STATE LINE 531300 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : 1.00 MANAGER: PETE BLOCKER
CONG DIST. l
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY
$
2
AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LIS~ING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 48
COUNTY P, I.NO.
CHATHAM
DESCRIPTION PROJECT DATA
PROPERTY PURCHASE, FACILITY
EXP.,
8 TRANSIT COACHES,
FISCAL
COST
E-T-C-. ---------------C-OM--M-E-N-T-S---------------------------Y-E-A-R-.-------E-S-T-S--
505010 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 1 & 11
FUNDS RECIPIENT: CHATHAM AREA TRANSIT MANAGER: STEVE KISH
CAPITAL 1994
$ 4000
FUND SOURCE: URBAN TRANSIT DISC,
FED SHARE$ 3200
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$ 400
0TH SHARE$ 400
CHATHAM 505011
CAP. MAINT., VEHICLES, FACILTIY IMP., TOOLS, FURNITURE;. ETC
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH
<
CONG DIST .. l & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1995
$ 340
FED SHARE$
272
GA. SHARE$
34
0TH SHARE$
34
CHATHAM .505012
CAP. MAINT., VEHICLES, TOOLS, EQUIPMENT, FACILITY IMP., ETC TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH.
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$
370
FED SHARE$ 296
GA. SHARE$
37
0TH SHARE$
37
CHATHAM 505014
PUBLIC TRANSIT SERVICE FOR SAVANNAH AND CHATHAM COUNTY
TRANSIT PROJECTS/ OPERATIONS
.
FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
3473
1702 1702 3473
CHATHAM 505015
PUBLIC TRANSIT SERVICE FOR SAVANNAH AND. CHATHAM COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $
FED SHARE$ GA. SHARE $ 0TH SHARE$
4536 907 907
4536
CHATHAM 505016
PUBLIC TRANSIT SERVICE FOR SAVANNAH AND CHATHAM COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST, 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
4266 896 896
4266
CHATHAM 5V1010
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH
CONG DIST. 1 & 11
CAPITAL 1994
$
54
FUND.SOURCE: ELDERLY & QISABLED FUND FED SHARE$
43
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
6
0TH SHARE$
5
- ,.,
...
~
-
1!!18
~
~
~
~
~
~
~
~
fl
~-:::t::.::;:.i
/!t~:\:~:;t . i~:::::~~~~~
1;;.:1.~~
... .,,. riit>.l~i t-~-:-~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 49
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
(_ .
FISCAL
COST
-P--, -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
CHATHAM ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
5Vl011 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 1 & 11
FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA
CAPITAL 1995
$
56
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $.
45
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
0TH SHARE$
6
CHATHAM 5Vl012
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH
CONG DIST. 1 & 11
CAPITAL 1996
$
58
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
46
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
6
0TH SHARE$
6
CHATHAM 510936
SR 404/US 17A LANDSCAPING FOR TALMADGE MEMORIAL BRIDGE LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : ,00 ~EXIST.LANES: 0 /PROPOSED LANES: 0 MANAGER: E. LAWS
SAVANNAH TIP f 94-H-10 CONG DIST. 1 & 11
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
. 0
CONST 1994
$
750
FED SHARE$
600
GA. SHARE $
150
0TH SHARE$
CHATHAM 511010
I-95 TRUCK RAMP & WEIGH STATION JUST SOUTH/ SC LINE & 51Y010 WEIGH STATION/ RECST. OR REHAB. PROJECT MILEAGE : .38 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: RON BRAZIEL (C)
SAVANNAH TIP f 94-H-3 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1994
$
161
CONST 1994
$ 3212
FED SHARE$ 2570
GA. SHARE$
642
0TH SHARE$
CHATHAM 51102X
I-95 FM 0.8 MIS/US 17-BRYAN CO TO OGEECHEE.RVR/INCL RVR BRS
RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : .00
.
MANAGER: H. ASHMORE
CONG DIST, 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 511020 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1994
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
CHATHAM 511060
I-95@ CR 984/JIMMY DELOACH PKWY
INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CHURCH (M)
SAVANNAH TIP f 91-H-8
CONG DIST, 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1996 $ 6000 FED SHARE$ 4800 GA. SHARE$ 1200 0TH SHARE$
CHATHAM 511160
I-95 FM N/I-16 IN CHATHAM THRU EFFINGHAM TO S.C. SL;& 51Yl60 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 13.10 MANAGER: \. REYNOLDS
SAVANNAH TIP f 93-H-2 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL.HIGHWAY ADMIN FUNDS
PE 1994
$
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
396
0 23897 19118
4779
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 50
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-H-A-T-H-A-M----I--1-6--A-T--M-P--1--6-5-.1-,--1--6-4-.0--, --1-6-3-.-2-, --1-6-2-.-3-, --A-ND---I--5-1-6---IN-T-E-R-C-H-A-N--G-E------S-A-V-A-N-N-A-H--T-I-P--I--9-4--H----2-------------------PE---1-9-9-5-----$-----1-10
511180 BRIDGES/ RECST. OR REHAB.
CO~G DIST. 1
ROW NONE
$
0
PROJECT MILEAGE : .00
CONST
AFTER 96
MANAGER:
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 511200
I-16 FM I-95 TO END OF I-16@ MP 166.3 & LIGHT,SGN,WALLS GUARDRAIL/ TRAFFIC PROJECT MFLEAGE : 9.20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
'
CHATHAM 51Y010
I-95 TRUCK RAMP AND WEIGH STAT.; FOR IM FUND; SEE 511010
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CHATHAM 51Yl60
I-95 FM N/I~16 TO SC STATE LINE; FOR IM$; SEE 511160 UNKNOWN/ UNKNOWN . PROJECT MILEAGE .00 - EXIST.' LANES: 0 /PROPOSED LANES: 0
MANAGER:
CHATHAM 521495
SR 204/ABERCORN.ST@ SOUTHWEST BYP INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : 1.14 ._EXIST.LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS
CHATHAM 521505
HARRY S.TRUMAN PKY/PH IV FM WHITFIELD AVE TO MONTGOMERY X-RD CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.90 MANAGER: G. ROSS
SAVANNAH TIP I 94-H-1
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP f 91-H-14
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP I 87-H-10
CONG DIST. 1 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1994 $ 1234
FED SHARE$ 1234
GA. SHARE$
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994
$
350
FED SHARE$ 315
GA. SHARE$
35
0TH SHARE$
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$
0TH SHARE$
0 0 2500 2250 250
PE 1992
'
UNDERWAY
ROW LOCL
CONST 1996 $ 7297
FED SHARE$ 5838
GA. SHARE$ 1459
0TH SHARE$
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
CHATHAM 521508
HARRY S.TRUMAN PKY/PH III FM MONTGOMERY X-RD TO DERENNE AVE CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: G. ROSS
SAVANNAH TIP I 87-H-9,
CONG DIST._l & 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
,,
.....,
l!B
~
~
~
~
~
~
~
~
~
~~
I
~:~:.:;:,:~
~;-:~~:. ,,:
[(~:~?::~::!
1:.:x-n~~
~~'-A~ ~ ,,.
. . /:...., ...;,~~ ~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 51
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--, ---------------P-R-O--JE-C-T---D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHATHAM HARRY S TRUMAN PKWY FM S OF HENRY-ANDERSON TO PRESIDENT ST
SAVANNAH TIP f 87-H-8
PE 1992 UNDERWAY
521680 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
CONG DIST. 11
ROW LOCL
PROJECT MILEAGE : 1.70
CONST 1994
$ 29701
MANAGER: G. ROSS
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$ 23761
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 5940
0TH SHARE$
CHATHAM 52175X
US 17@ OGEECHEE RIVER/SEE BRYAN COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: M. REYNOLDS
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521755 IS AN ASSOCIATED PROJECT.
PE 1991 UNDERWAY
ROW NONE
$
0
CONST 1995 $
0
FED SHARE $
GA. SHARE $
0TH SHARE $
CHATHAM 521770
SR 26 FM BRYANWOOD RD TOW/BULL RIV INCLD BIKE LANE & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.94 MANAGER: G. ROSS
SAVANNAH TIP f 87-H-34 CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 52Y770 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1996 CONST
UNDERWAY $ 200 AFTER 96
CHATHAM 521780
SR 26/GARDEN CITY FM CR 704 TO SR 25/US 17;INCL CLVT EXT
TURN LANES/ TRAFFIC PROJECT MILEAGE : .70 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D, SMITH
SAVANNAH TIP f 90-H-8 CONG DIST. l
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$
100
CONST 1994
$
826
FED SHARE$
743
GA. SHARE$
83
0TH SHARE$
CHATHAM 521855
SR 26 FM 4-LN E/LYNES PKWY TO VICTORY DR/CS 188 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.38 MANAGER: G. ROSS
SAVANNAH TIP f 87-H-18b CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 5620 FED SHARE$ 4496 GA. SHARE$ 1686 0TH SHARE$ 2810
CHATHAM 521860
SR 25 FM 4-LN N/SR 204 NE TO SR 307(INCL PARALLEL BRIDGE) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.40 MANAGER: G, ROSS (C)
SAVANNAH TIP t 90-H-6
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL CONST 1996 $ 5976
FED SHARE$ 4781 GA. SHARE$ 1195 0TH SHARE$
CHATHAM 521865
SR 25/US 17 FM OGEECHEE RVR OFLW TO S/SR 204(& NEW BR) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.75 MANAGER: G. ROSS (C)
SAVANNAH TIP t 90-H-7
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521867 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW LOCL
CONST 1996 $ 4281
FED SHARE$ 3425
GA. SHARE$
856
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 52
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-HP-A-,IT-.H-NA-OM--. --SR---2-5/-U-S---17-/-0-C-EP-AR-NO--JE-HC-WT-Y-@-D-A-OT-AG-E-E-C-HEE---R-IV-E-R--O--V-ER-F-L-O-W--------------------SA-V-A-N-N--AC-HO-M-TM-IE-PN-T-St--9-0--H----7-------------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY
521867 REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES,
CONG DIST, 1
ROW LOCL
PROJECT MILEAGE : .05_ MANAGER: G. ROSS (C)
FUND SOURCE: BRIDGE PROGRAM
CONST 1996
$
445
FED SHARE$
356
FEDERAL HIGHWAY. ADMIN FUNDS
GA. SHARE$
89
521865 IS AN ASSOCIATED PROJECT.
0TH SHARE$
CHATHAM 52217X
SR 17/US 80 FM SR 27 TO CHERRY ST IN BLOOMINGDALE/EFFINGHAM RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.67 MANAGER: UNKNOWN
r:-
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 522170 IS AN ASSOCIATED PROJECT.
PE 1994 ROW 1996 CONST
$
0
$
0
AFTER 96
CHATHAM 522490
SR 26/US80 FM W OF BULL RIVER TOE OF LAZARETTO CRK/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 5.16 MANAGER: G. ROSS
SAVANNAH TIP f 93-H-3 CONG"DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL_HIGHWAY_ADM~N FUNDS
PE 1995 ROW CONST
$ 602 AFTER 96 AFTER 96
CHATHAM 522610
SR-25/US-17 OVER THE SAVANNAH RIVER REPLACEMENT OF THE EXISTING BRIDGES (S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:.
SAVANNAH TIP f.90-H-6 CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM F~QERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW C9NST
$ 150 AFTER 96 AFTER 96
CHATHAM 522670
RE-ROUTING SR 25/US 17 IN PORT WENTWORTH TO SR 30 RECONSTRUCTION & WIDENING, NO LANE ADDITION PROPOSED. PROJECT MILEAGE : ,94 MANAGER:
SAVANNAH TIP t 92-H-5
CON.G DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW CONST
$ , 15
AFTER 96 AFTER 96
CHATHAM 52Y770
SR 26 FM BRYANWOOD RD TO BULL RIV (SHOWN FOR BIKE FUNDS 33B) BICYCLE/PED. FACILITY/ RECST. OR REHAB. PROJECT MILEAGE: 1.94 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: G. BOULINEAU
CHATHAM 531260
SR 204 EB FM MP 2.0-3.2;WB MP 3.7-4.7 SE OF MELDRIM ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.20 MANAGER: PETE BLOCKER
SAVANNAH TIP f. 87-H-34 CONG DIST. 1
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS 521770 IS AN ASSOCIATED PROJECT.
SAVANNAH TIP f 92-H-7 CONG DIST. 1 .
FUND SOURCE: SURFACE TRANSPORT. FEDERAL..HIGHWAY ADMIN FUNDS
PE NONE ROW 1996 CONST
$
0
$
0
AFTER_ 96
PE 1992 UNDERWAY
ROW 1995 $
14
CONST 1996
$
660
FED SHARE $
528
GA. SHARE $ 132
0TH SHARE $
,.,,,,
. . ,
~
s.9
~
~ ~
'
~
~
JtfJ~
~
~
it:@.(:~s
~~.,
~~
,(t.''"'.'\:-!.
r,':,'.'7;~
,~~:~
.. ~. ~~
r::~:-.~~
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 53.
COUNTY
DESCRIPTION
FISCAL
COST
C-HP-A-. T-IH.-NA-MO--. -S-R--2-0-4-/A--B-E-R-C-O-R-NP-R-OS-T-JE-.C-T@--DE-IA-S-THA-E-N-H-O-W--ER---IN---SA-V-A-N-N-A-H----------------------SA-V-A-N--N-AC-HO-M-TM-IE-PN-T-Sf--9-4--R----5-------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--O
532510 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 1
ROW 1994 $ 300
PROJECT MILEAGE : .00 - EXIST. LANES: 7 /PROPOSED LANES: 8
CONST 1995 $ 133
MANAGER: PETE BLOCKER-
FUND SOURCE: RWY. SAFETY
FED SHARE$ 120
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
13
0TH SHARE$
CHATHAM 541900
SR 25 ALT/US 17@ GRAHAM ST IN SAVANNAH INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .40 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: PETE BLOCKER
SAVANNAH TIP f 93-H-1 CONG DIST. 11
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1994 $ 350
FED SHARE$ 315
GA. SHARE$
35
0TH SHARE$
CHATHAM 550460
STEPHENSON AVE/SAVANNAH FM ABERCORN ST TO WATERS AVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .85 MANAGER: BILL MOSKAL (C)
SAVANNAH TIP f 89-H-5 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
2181 1745
436
CHATHAM DIAMOND CSWY FM FERGUSON AVE TO MCWHORTER DR 550550 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
'.
PROJECT MILEAGE : 3.20
MANAGER: G. ROSS
SAVANNAH TIP f 92-H-3 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 1810 AFTER 96
CHATHAM 550560
WHITFIELD AVE FM OLD WHITFIELD RD TO FERGUSON AVE/ SAVANNAH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: G. ROSS
SAVANNAH TIP f 87-R-39 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
CHATHAM 570830
SURVEILLANCE AND MONITORING SYSTEM IN SAVANNAH CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. PROJECT MILEAGE : .00 MANAGER:
CHATHAM 570850
MCQUEENS ISLAND ABANDONED RAILROAD MULTIPURPOSE TRAIL BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KEITH GOLDEN
SAVANNAH TIP f 94-H-6 CONG DIST. 11
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
SAVANNAH TIP f 94-H-8 CONG DIST. 1 & 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1995
$
578
FED SHARE $ 520
GA. SHARE $
58
0TH SHARE $
PE LOCL
ROW LOCL
CONST 1995
$
440
FED SHARE$ 352
GA. SHARE$
0TH SHARE$
88
GEORGIA.DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 54
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-H-A-T-H-A-M---E-X--T-. -O-F--R-.--M-C-C-O-R-K-L-E--S-R--B-I-K-E-W-A-Y--O-N--W--IL-M--IN-G-T-O-N---IS-L-A-N-D----------------SA-V-A-N-N-A-H---T-I-P--f--9-4--H----9-------------------P-E--L-O-C-L-----------
570860 BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST. 11
ROW LOCL
PROJECT MILEAGE : . 00 - EXIST. LANES: .0 /PROPOSED LANES: 0
CONST 1996
$
110
MANAGER: KEITH GOLDEN
FUND SOURCE: TRANS. ENHANCE.
FED SHARE$
88
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
22
CHATHAM 570870
LANDSCAPING & RAILROAD YARDS & SHOPS/VISITOR CENTER REHAB MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - ,EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: KEITH GOLDEN
SAVANNAH TIP f 94-H~7 CONG DIST. 1 & 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
2450 1960
490
CHATHAM 570880
OLYMPIC LANDSCAPING IN SAVANNAH, 1994 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW LOCL
CONST 1994
$
625
FED SHARE$ 500
GA. SHARE$ 125
0TH SHARE$
CHATHAM 570890
OLYMPIC LANDSCAPING IN SAVANNAH, 1995 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
<.
CHATHAM 570900
OLYMPIC LANDSCAPING IN SAVANNAH, 1996
LANDSCAPING/ ENHANCEMENT
PROJECT MILEAGE : :oo - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
'
SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 $ ROW LOCL
CONST 1995 $ FED SHARE$ GA. SHARE$
0TH SHARE$
25
1094 875 219
PE 1996 $ ROWLOCL
CONST 1996 $ FED SHARE$ GA. SHARE $
0TH SHARE$
25
1094 875 219
CHATHAM 570910
BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 5/SEE 57Y910
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : 00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
O
ROW NONE' $
0
CONST 1994 $ 392
FED S~ARE $ 353
GA. SHARE$
39
0TH SHARE$
CHATHAM 570960
BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT f5/GLYNN BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 .- EXIST. LANES: 0 /PROPOSED LANES: 0. MANAGER: UNKNOWN .
CONG DIST. 1
FUND. SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROWNONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE $ ..
0 - O
1206 965 241
. ,
&
~
. li!IM ,,~
~
~
,ffiM
8kJi~~j
ftfiU.t,:,
~~.OE~
~l'.:JL~
~:.~:f.i,l
~
(iC?~~
f!!;~~..z~
ti:'i' ;:~ti
..'~~;; ,
.,.'~-
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
CHATHAM 57Y910
BRIDGE PAINT.ING PROJECT FOR FY 1994 - DISTRICT 5/SEE 570910
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 55
FISCAL YEAR
COST ESTS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
336
FED SHARE$
269
GA. SHARE$
67
0TH SHARE$
CHATHAM 81103X
CALL BOXES ON I-16 FROM SR 87/BIBB TO I-95/CHATHAM .. SEE BIBB
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 1 & 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
('
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 56
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA.
---------------------------------------
--------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE
3B1203 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 2
FUNDS RECIPIENT: CHATTAHOOCHEE
OPERATING 1994 $
40
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
22
GA. SHARE$
0TH SHARE$
18
CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE 3Bl204 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHATTAHOOCHEE MANAGER: STEVE KISH
t
CONG DIST. 2
OPERATING 1995 $
41
FUND SOURCE: RURAL TRANSIT
FED SHARE$
23
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
18
CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1205 TRANSIT FACILITIES/ OPERATIONS
FUNDS. RECIPIENT: CHATTAHOOCHEE MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1996 $
43
FUND SOURCE: RURAL TRANSIT
FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
19
CHATTAHO ONE CONV. VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS 3C2203 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHATTAHOOCHEE COUNTY MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1994
$
54
FUND SOURCE: RpRAL TRANSIT
FED SHARE$
43
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
0TH SHARE$
5
CHATTAHO SR 1@ HICHITEE CREEK 321580 . REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .30 MANAGER: M. REYNOLDS (C)
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322160 IS AN ASSOCIATED PROJECT.
PE 1990 UNDERWAY
ROW NONE $
0
CONST 1996 $ 865
FED SHARE$
692
GA. SHARE$ 173
0TH SHARE$
.,
..
. ,
1
ffiM
. PiM8 ,,~ ~ l ~ ~ Mn!ill@ !~(~;," I&~ ~ !*-'ki:',~:li lo/2"~";~
--::
;-::::~"-({-.:~:
~
-. ~-~
):-
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT.OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
16-Sep-1993 Page 57
FISCAL YEAR
COST ESTS
CHATTOOG US 27@ ARMUCHEE & LITTLE ARMUCHEE CRKS/SEE FLOYD CO 62107Z UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .06 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RAY METTS
PE NONE $
0
CONG DIST. 7
ROW NONE $
0
GRIP PROJECT
CONST 1994 $
0
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
621075 IS AN ASSOCIATED PROJECT.
0TH SHARE$
CHATTOOG SR 48 W/SUMMERVILLE EB/WB/TL MP 9.96-10.86;WB 11.7-12.05
621330 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.25 MANAGER: BILL MCVEY
CO~G DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
593
FED SHARE$ 474
GA. SHARE$
119
0TH SHARE$
CHATTOOG CR 1 NE OF TRION@ CHAPPEL CRK 670720 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .13 MANAGER: BILL MCVEY
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$
180
FED SHARE$
144
GA. SHARE$
36
0TH SHARE$
CHATTOOG CR 170/PENN BRIDGE RD OVER CHATTOOGA RIVER SE OF TRION 670750 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .15 MANAGER: BILL MCVEY
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 1079
FED SHARE$
863
GA. SHARE$ 216
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 58
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
-------------------------------.--------
----------------
------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE
6Bl338 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 9 & 6
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
f_
OPERATING 1994 $
83
FUND SOURCE: RURAL TRANSIT
FED SHARE$
49
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
34
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6Bl339 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
CONG DIST. 9 & 6
OPERATING 1995 $
87
FUND SOURCE: RURAL TRANSIT
FED SHARE$
51
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
36
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6Bl340 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
CONG DIST. 9 & 6
OPERATING 1996 .$
90
FUND SOURCE: RURAL TRANSIT
FED SHARE$
53
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
37
CHEROKEE ONE CONVERSION VAN AND ONE MINIBUS 6C2338 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
CONG DIST. 9 & 6
CAPITAL 1994
$
71
FUND SOURCE: RURAL TRANSIT
FED SHARE$
57
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
7
0TH SHARE$
7
CHEROKEE TWO CONVERSION VANS 6C2339 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE
MANAGER: STEVE KISH
CONG DIST. 9 & 6
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1995
$
57
FED SHARE$
46
GA. SHARE$
5
0TH SHARE$
6
CHEROKEE ONE MINIBUS 6C2340 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
CONG DIST. 9 & 6
CAPITAL 1996
$
42
FUND SOURCE: RURAL TRANSIT
FED SHARE$
34
FEDERAL TRANSIT ADMIN FUNDS
- GA. SHARE $
4
0TH SHARE$
4
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl013 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY
MANAGER: STEVE KISH
CONG DIST. 9 & 6
CAPITAL 1994
$
16
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
f.
. .,
,.
gm
l!!!!!!!!J
~
,,
~
~
~
~
~'~~8
e~n
t:lf!..b,
~e-~
v..........;.~
r.::~::;:~:.)1
11,,K.~1
it . :.;~
.r: ..~ '
,. 'i
.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 59
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
-----------
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
COMMENTS
YEAR
EST$
--------------------------------.-------------------------
6V1014 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 9 & 6
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY
CAPITAL 1995
$
16
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: CHEROKEE COUNTY MANAGER: STEVE KISH
CONG DIST. 9 & 6
CAPITAL 1996
$
16
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
CHEROKEE I-75@ SR 92
610740 INTERCHANGE/ RECST. OR REHAB.
I
PROJECT MILEAGE : .45 - EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: RAY METTS (M)
ATLANTA TIP I CH/R 108
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CON::r
UNDERWAY AFTER 96 AFTER 96
CHEROKEE I-575 SB ON RAMP FROM CR 416/TOWNE LAKE PARKWAY 610970 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CHEROKEE SR 92 FM WOODSTOCK RD TO CHEROKEE TRAIL 620920 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.75 MANAGER: RAY METTS (M)
ATLANTA TIP I CH 24
CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CH 3 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1996 $ 121
FED SHARE$ 109
GA. SHARE$
12
0TH SHARE$
PE 1996 ROW CONST
$
150
AFTER 96:
AFTER 96
CHEROKEE SR 92 FM I-75 TO WOODSTOCK RD 620940 RECONSTRUCTION & WIDENING.FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.59 MANAGER: RAY METTS (M)
ATLANTA TIP I CH 4
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW
CONST
$
150
AFTER 96
AFTER 96
CHEROKEE SR 92 FM E OF SR 754 TO OLD MOUNTAIN PARK RD/COBB 621200 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.10 MANAGER: RAY METTS
ATLANTA TIP f CH 20 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY .I\DMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$ 7192
CONST 1996 $ 8975
FED SHARE $ 7180
GA. SHARE $ 1778
0TH SHARE $
17
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 60
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P. I.NO.
PROJECT DATA
-- CHEROKEE SR 140 REL FM CR 311 NW TO CR 375;THEN NEW LOC TO CR 765
621240 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.30
MANAGER: RAY METTS _(M)
FISCAL
COST
-------AC--TOL-NA-GN---TDA-CIO-SM-TT-MI. P-E-6N-f.T-S-CH---.5---------------------RO-PW-EY-E-A1-R9-9-2-----AU-NEF-TDS-TEER-RSW--A9Y6
CONST
AFTER 96
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
CHEROKEE SR 92 FM CHEROKEE TRAIL TO CANTON HWY/SR 754 621390 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10
MANAGER: N. PASSMORE (M)
ATLANTA TIP f CH 9 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$ 3712 AFTER 96
CHEROKEE CANTON HWY FM PALM RD/CR 351 TON/SIXES RD [INCL RR BR) 630673 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
PROJECT MILEAGE: .37 MANAGER: .BILL MCVEY
CHEROKEE SR 140 FM SR 5 BUS TO LOWER BURRIS RD NORTH OF CANTON 630942 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.22 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f CH2 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 63Y673 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CH .7
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY ROW LOCL CONST 1996 $ 500
FED SHARE$ 400 GA. SHARE$ 100 0TH SHARE$
PE 1992 ROW_
CONST
UNDERWAY
AFTER 96 AFTER :96
CHEROKEE CR 770/BELLS FERRY RD FM CR 421 TO CR 1012 630945 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.00 MANAGER: H. ASHMORE
r.
CHEROKEE CR 770/BELLS FERRY RD NEW PARALLEL BR@ LITTLE RIVER 630975 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .21 MANAGER: H. ASHMORE
CHEROKEE CR 770/BELLS FERRY RD FM CR 1012 TON OF N/VICTORIA RD 630977 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.90 MANAGER: H. ASHMORE(M)
ATLANTA TIP t CH 1
CONG DIST. 6 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I.CH 18 CONG DIST. 6 -
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t CH .10
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW LOCL
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
o
2182 1746
186 250
-
PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 5526 FED SHARE$ 4421 .
GA. SHARE$ 1105 0TH SHARE$
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
,.
. ,
~
-= ~
~ ~
~
~'~~
~
ttt:.;~,lii;~
~=~:.:::et1
~'ili!ltl
tx~-~~
~': .. ::
tr~-~
I': ::,~
.. ~~ .,
. ;~;...... ~~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 61
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-PH-E-. RI-.O-NK-O-EE-. -S-R--5-B--/S-R--1-4-0--F-MP-R-O5---JLE-NC-T--SD-O-A-TFA--H-I--SC-H-O--O-L--N--T-O-E---O-F--H-O-S-P-IT-A--L--D-R---------A-T-LA--N-T-AC-O-MT-MI-PE-N-fT-S-C-H--1-6---------------------P-EY-E-A1-R9-9-2-----U-EN-DS-TER-SW--AY
631000 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 9
ROW 1991
UNDERWAY
PROJECT MILEAGE : 1.15
CONST 1994
$ 1839
MANAGER: K FULBRIGHT
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 1471
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
368
0TH SHARE $
CHEROKEE CR 1061/CANTON HWY FM END OF MULTI-LN N/I-575 TO SR,20 631130 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.77
MANAGER: M GANNAWAY (M)
ATLANTA TIP f CH 6 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
ROW LOCL CONST
UNDERWAY AFTER 96
CHEROKEE SR 5 BUS FROM HOSPITAL DR/CS 657 NE TO I-575/SR 5 631150 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.21 MANAGER: K FULBRIGHT (M)
ATLANTA TIP f CH 8 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
CHEROKEE CR 772/KELLOG CREEK RO @ KELLOG CREEK 631215 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .15 MANAGER: H. ASHMORE
CHEROKEE SR 140/CANTON-ROSWELL RD AT CR 297/EARNEY RO & CR 311/MTN RO 631390 INTERSE.CTION IMPROVEMENT / TRAFFIC
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CHEROKEE SHOWN FOR STP FUNDS ONLY ..... SEEP.I. 630673 63Y673 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BILL MCVEY
(_
CHEROKEE SR 20@ SR 372 641701 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .12 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: BILL MCVEY.
ATLANTA TIP f CH 19 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
ATLANTA TIP f CH 25 CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CH 2 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630673 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f CH 15 CONG DIST. 6 & 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 749 FED SHARE$ 599 GA. SHARE$ 150 0TH SHARE$
PE NONE $
0
ROW 1994 $ 275
CONST 1994 $ 418
FED SHARE$
376
GA. SHARE$
42
0TH SHARE$
PE 1994
UNDERWAY
ROW 1985 UNDERWAY
CONST 1996 $ 321
FED SHARE$ 257
GA. SHARE$
64
0TH SHARE$
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
285
FED SHARE$ 257
GA. SHARE$
29
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 62
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
----------------------------------------
------------------------
.--------------C-O-M-M--E-N-TS---------------------------Y--EA-R---------E-S-T-S--
CHEROKEE BELLS FERRY RD FM COBB CO LINE TO PINE RIDGE DR
ATLANTA TIP f CH 13
PE NONE $
0
650370 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 6
ROW LOCL
PROJECT MILEAGE : 1.43
CONST 1994
$ 3401
MANAGER: H. ASHMORE
_FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 2721
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
680
0TH SHARE$
CHEROKEE CR 770/BELLS FERRY RD FM PINE RIDGE DR TO BASCOMB CARMEL RD
650375 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.01 MANAGER: H. ASHMORE
ATLANTA TIP f CH 14 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW LOCL
CONST 1994
$.
FED SHARE$
GA. SHARE$
0TH SHARE$
0
2178 1742
436
CHEROKEE HISTORIC TRAIN DEPOT RESTORATION IN HOLLY SPRINGS 670840 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
ATLANTA TIP f CH 22 CONG DIST. 6 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996
$
175
FED SHARE$
140
GA. SHARE $ '
0TH SHARE$
35
CHEROKEE HISTORIC DEPOT RESTORATION IN WOODSTOCK & SIDEWALKS 670850 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ATLANTA TIP f CH 23 CONG DIST. 6 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONSTl995
$
125
FED SHARE$
100
GA. SHARE$
0TH SHARE$
25
CHEROKEE SR 140 FM RANCHETTE RD TO CR 311:BR@ LITTLE RVR/SEE FULTON
72130X UNKNOWN/ UNKNOWN. PROJECT MILEAGE : .05 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: RAY METTS
ATLANTA TIP t FN 13 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721305 IS AN ASSOCIATED PROJECT.
PE 1991 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
CHEROKEE SR 140/HOUZE RD@ LITTLE RIVER@ CHEROKEE CO LINE 72130Z REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: RAY METTS
ATLANTA"TIP t FN 13
CONG DIST. 6
. FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721308 IS AN ASSOCIATED PROJECT .
PE 1991 ROW LOCL CONST
UNDERWAY AFTER 96
., ,.
'
., ,
'...-:o.
~
~
~ ~
~.3
~
~ ..:J.,,.t/' ,;;.:...i:,
~g:~~
==..;:;;::,
c~y,?:1
pJi:i!!.il
:~~.~~
h~!~~
r;~to-t:~1
ii-:;:)
~
.
..,, ~ \ _, ._. I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 63
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O-.----------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-ST--S--
CLARKE MULTI-MODAL TRANSP. CTR, VEHICLES, CAP. MAINT., REPAIRS, ETC
101010 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 10
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
CAPITAL 1994
$ 1707
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$ 1366
, '
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
171
0TH SHARE$
171
CLARKE 101011
VEHICLES, CAP. MAINT., REPAIRS, SIGNS, POLES, SHELTERS, ETC.
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1995
$ 357
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$ 286
FEDERAL TRANSIT,ADMIN FUNDS
GA. SHARE$
36
0TH SHARE$
36
CLARKE 101012
VEHICLES, CAP. MAINT., SHELTERS, BUS SIGNS, POLES, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1996
$ 425
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
340
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
43
0TH SHARE$
43
CLARKE ADA EQUIPMENT FOR BUSES - PUBLIC ADDRESS, PHONE, VOICE SYST.
101013 TRANSIT PROJECTS/ CAPITAL
.
CONG DIST. 10
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
CAPITAL 1994
$
58
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
52
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
CLARKE 101014
ADA EQUIPMENT FOR BUSES - VOICE ANNUNCIATION SYSTEMS
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1995
$
11
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
10
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
CLARKE 101016
PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE-KISH
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $ FED SHARE$
GA. SHARE$ 0TH SHARE$
1050 525
525
CLARKE 101017
PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
1100 550
550
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
CLARKE 101018
PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIEN.T: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST .. 10
FUND SOURCE: URBAN TRANSIT F~DERAL TRANSIT ADMIN FUNDS
16-Sep-1993 Page 64
FISCAL YEAR
COST ESTS
.---------------- ----------
OPERATING 1996 $ . , FED- SHARE $
GA. SHARE$ 0TH SHARE$
1300 364 1 937
CLARKE 1Vl010
ELDERLY AND DISABLED'VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1994
$
15
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
12
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
CLARKE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
(
lVlOll TRANSIT PROJECTS/ CAPITAL
CONG DIST. 10
FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
CAPITAL 1995,
$
15
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
12
(.
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
CLARKE 1Vl012
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1996
$
16
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
CLARKE 121970
CR 600/DANIELSVILLE RD FM 4-LN NEAR CR 109 TO CR 107/HULL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .43 MANAGER: L. OWENS
ATHENS TIP f II-01-2 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
CLARKE 121990
PRINCE AVE FM S/SR 8 TO 600' N/CSX RR BR ON JEFFERSON ST INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE: .50 - EXIST. LANES: 4 /PROPOSED LANES: 8
MANAGER: L. OWENS
CLARKE 122160
SR 15 ALT/US 129 FM LAVENDER DR IN CLARKE CTY TO SR 330 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.71 MANAGER: RON BRAZIEL (M)
ATHENS TIP f II-01 CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122350 IS AN ASSOCIATED PROJECT.
ATHENS TIP f II-02-2
CONG DIST. 19
.
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1994
$. 2197
FED SHARE $ 1758
GA. SHARE $
439
0TH SHARE $
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
.. ....
' _;;
,. "'
., ..
. '
'P
--
MM
M!8
~
== { ~
~
~L~
~~
lfth11i
~:r;.11:"tij
~:.~
.Wi~~
(.!::;~;~1
,~!t'!
i:i:.::":U
~:f:.-:'.~
.i:.-;.v.....:~\~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 65
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-PL-A-. R-I.K-NE-O--. -S-R--1-5-/-P-R-I-N-C-E--A-P-VR-EO-/N-JE-CA-T-TH-D-ENA-ST-A--B-Y-P-@---C-SX---R-R----------------------------A-T-H-E-N-S-C-OT-MI-PM-E-fN-T-SI-I--0-2-----------------------P-EY-E-A1-R9-9-2-----U-NE-DS-ETR-SW--AY
122350 REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 6 LANES.
CONG DIST. 10
ROW NONE
$
0
PROJECT MILEAGE : .10
CONST 1994
$
350
MANAGER: L. OWENS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE. $ 280
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
70
121990 IS AN ASSOCIATED PROJECT.
0TH SHARE $
CLARKE 12257Z
SR 10/US 78 MONROE TO ATHENS, MEDIAN OPENINGS; SEE WALTON
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
0
ROW NONE $
0
CONST 1994
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
CLARKE 122600
SR !OLP/ATHENS BYPASS NB ON & OFF RAMPS TO WINTERVILLE RD
RAMP/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 2 MANAGER: L. OWENS (M)
ATHENS TIP f III-OS CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW 1996 CONST
$
10
$
10
AFTER 96
CLARKE 122680
SR 8/US 78@ HUNTINGTON RD AND ATHENS BYPASS
r
INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : ,53 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. OWENS
CLARKE 13234Z
SR 10 FM ALCOVY RIVER/WALTON THRU OCONEE TO SR 8/CLARKE GUARDRAIL/ TRAFFIC PROJECT MILEAGE : 10.10 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CLARKE 15021X
EPPS BRIDGE RD@ MCNUTT CREEK ... SEE OCONEE UNKNOWN/ UNKNOWN PROJECT MILEAGE : ,00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: UNKNOWN
CLARKE 15021Y
CR 473/EPPS BR RD FM SR 10/0CONEE TO US 78 ... SEE OCONEE UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1994
$
150
CONST 1994
$
450
FED SHARE $
405
GA. SHARE $
45
0TH SHARE $
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
ATHENS TIP f II-03
PE NONE $
0
CONG DIST. 10
ROW LOCL
CONST 1995 $
0
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
150215 IS AN ASSOCIATED PROJECT.
0TH SHARE$
ATHENS TIP f II-03
PE NONE $
0
CONG DIST. 10
ROW LOCL
. CONST 1995
$
0
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
FEDERAL.HIGHWAY ADMIN FUNDS
GA. SHARE$
150210 IS AN ASSOCIATED PROJECT.
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 66
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-JL-.A->R-,IK-,NE-O--. -T--R-A-IL-S--A-L-O-N-G--O-PC-RO-O-N-EJE-EC-T-R-IV-D-A. -TA-IN---U-G-A--E-.--C-A-M-P-U-S---E-X-P-A-N-S-IO--N--A-R-E-A----------A-T-H-E-N-S-C-OT-MI-PM-E-IN-T-VS---0-2-----------------------P-EY-E-AL-OR-C-L------E-S-T-S--
-170920 BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST. 10
ROW LOCL
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
886
MANAGER: UNKNOWN
FUND SOURCE: TRANS, ENHANCE.
FED SHARE$
709
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$
0TH SHARE$
177
CLARKE 170925
BIKEWAY/LANDSCAPING ON EPPS BRIDGE ROAD IN ATHENS BICYCLE/PED. FACILITY/ ENHANCEMENT . PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: H. ASHMORE
ATHENS TIP I V-01
CONG DIST, 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1995 $ 675
FED SHARE$
540
GA. SHARE$
0TH SHARE$
135
CLARKE 170960
LUMPKIN ST/ BAXTER ST SIGNAL SYSTEM IN ATHENS SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
CLARKE 170970
ATHENS CBD SIGNAL SYSTEM
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
ATHENS TIP I III~02
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATHENS TIP f III-04 CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
95
FED SHARE$
86
GA. SHARE$
10
0TH SHARE$
'
PE NONE $
0
ROW NONE .$
0
CONST 1996 $ 220
FED SHARE$
198
GA. SHARE$
22
0TH SHARE$
cLARKE 170980
REALIGNMENT OF RIVERBEND RD FM MILLEDGE AV TO COLLEGE STA RD
MINOR WIDEN & RESURF / TRAFFIC PROJECT MILEAGE : 1.40 ~EXIST.LANES: 2 /PROPOSED LANES: 2
MANAGER: L. OWENS
ATHENS TiP f III-01 CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1994 $ 130
FED SHARE$
117
GA. SHARE$
13
0TH SHARE$
CLARKE 171015
BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT fl BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
(_
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 517
FED SHARE$
414
GA. SHARE$ 103
0TH SHARE$
...
t
..
I 0
'V5-
9IIJl!!!I
~ ffl!!!!!1 I!!!!!! 91!!.!
~
~
~
t~~1'J
~
~.:;hi@'
a::..,:;:,~
'
t!t:!'.!:~2
/ffe,~
~;~~:>.~
r~,XJ'..!l
';.'..!C:<.'.;i
~~]
t:;
.
...; ..
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 67.
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLAY
COUNTY OPERATED PUBLIC TRANSIT SERVICE
4B1263 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 2
FUNDS RECIPIENT: CLAY
OPERATING 1994
$
51
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
31
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
20
CLAY 4B1264
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH
CLAY 4B1265
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1995 $
53
FUND SOURCE: RURAL TRANSIT
FED SHARE$
32
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
21
(
CONG DIST. 2
OPERATING 1996 $
55
FUND SOURCE: RURAL TRANSIT
FED SHARE$
33
FEDERAL TRANSIT ADMIN FUNDS
.GA. SHARE $
0TH SHARE$
22
CLAY 4C2263
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
CLAY 4C2264
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1995
$
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
3
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
16-Sep-1993 Page 68
FISCAL YEAR
COST ESTS
CLAYTON 7Vl010
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
CONG DIST. 3
CAPITAL 1994
$
26
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
21
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
3
CLAYTON 7Vl011
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
CONG DIST. 3
CAPITAL 1995
$
27
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
22
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
2
0TH SHARE$
3
CLAYTON 7Vl012
ELDERLY AND DISABLED-VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
CONG DIST. 3 .
CAPITAL 1996
$
28
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
22
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
CLAYTON 31097X
I-75 FM I-675 TO SR 7/US 41/HENRY (NOISE BARR. & LIGHTING) WALLS/ RECST. OR REHAB. PROJECT MILEAGE : 7.80 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: J. GRAYBEAL
(
ATLANTA TIP f CL-R 12 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 310976 IS AN ASSOCIATED PROJECT.
PE 1996 ROW NONE CONST
$
0
$
0
AFTER 96
CLAYTON 32205X
SR 42 FM SR 138/HENRY TO I-675 NB RAMPS .. SEE HENRY CO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: H. REYNOLDS
ATLANTA TIP f CL64/HE5 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 322050 IS AN ASSOCIATED PROJECT.
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
CLAYTON 712420
1-75 FM US 41/0LD DIXIE HWY TO I-285/INCL BR & FNTGE RDS RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.
PROJECT MILEAGE : 5.90 MANA;ER: J. GRAYBEAL
ATLANTA TIP t CL-R.11
CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1988 UNDERWAY
ROW 1991 UNDERWAY
(. CONST 1994
$ 17499,
FED SHARE $ 13999
GA. SHARE $ 3500
0TH SHARE $
CLAYTON 712425
1-75 FM SR 3/US 41/0LD DIXIE HWY TO I-285 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 2.90 MANAGER: J. GRAYBEAL (M)
ATLANTA TIP f.CL-R 11 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
I>
PE 1996 ROW CONST
$ 1000 AFTER 96 AFTER 96
,. ,.
..
't.
;{1111
~
.. -.. ~ ~
l!!!!!l!!I!'!
~
~
~
~
~
.l!l,!!,!.t~,!'ll
~.
l'!;~l':;.:i
F~~
-!-~t7"'.-~
~
.. ., ~
],;-:-- ....
'
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 69
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLAYTON I-285@ CONLEY ROAD
ATLANTA TIP f CL 4
PE 1988 UNDERWAY
712430 BRIDGES/ RECST, OR REHAB.
CONG DIST. 3
ROW LOCL
PROJECT MILEAGE :' .10
CONST
AFTER 96
MANAGER: G, ROSS
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 712602
LEE STREET IN MORROW OVER I-75
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : ,08 MANAGER: J. GRAYBEAL(CM)
ATLANTA TIP f CL 59 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
CLAYTON 712630
I-75/MORROW@ SR 54 (INCL RR BRIDGE OVER I-75) INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .23 - EXIST. LANES: 4 /PROPOSED LANES: 8 MANAGER: J. GRAYBEAL(CM)
CLAYTON 712970
HOV LN SIGNING ON I-75 & I-85 METRO/FUL;COBB;GWIN
HOV LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
CLAYTON 713050
I-675, I-75, I-20: IMPACT ATTENUATORS&BARRIER WALL AT BR. IMPACT ATTENTUATORS / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CLAYTON 713090
I-85 NB 62 SIGNS FROM I-285 TO SR 166 LAKEWOOD FWY .. FULTON
SIGNING/ MAINTENANCE
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
r..
CLAYTON 713110
I-75, VAR LOC FROM I-285 SOUTH TO BARRETT PKWY .. FUL-COBB
PVMNT MARKINGS/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
ATLANTA TIP f CL-R 31 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
ATLANTA TIP i R 73
CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t R 130
CONG DIST. 3 & 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS
ATLANTA TIP f R 130 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS 71309Z IS AN ASSOCIATED PROJECT.
ATLANTA TIP t R 130
CONG DIST. 5
..
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71311X IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 6221
FED SHARE$ 6221
GA. SHARE$
0TH SHARE$
PE 1994
UNDERWAY
ROW NONE $
0
CONST 1994 $ 1000
FED SHARE$ 1000
GA. SHARE$
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 223
FED SHARE$ 223
GA. SHARE$
0TH SHARE$
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 615 615
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 70
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P-.I-.-N-O--.----------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLAYTON I-75 FM US 41/0LD DIXIE HWY TO I-285; TO SHOW IM FUNDS
ATLANTA TIP f CL-Rll
PE NONE $
0
71Y420
RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.
PROJECT MILEAGE 5,90
MANAGER:
.
CONG DIST. 3 FUND SOURCE: I-STATE HAINT.
ROW NONE $
CONST 1994
$
FED SHARE$
0
6501 5851
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
650
0TH SHARE$
CLAYTON 720815
SR 42 FM LAKE HARBIN RD N TO ANVIL BLOCK RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.52 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f, CL 12 CONG DIST. 3
F~ND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 731090 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1996.
CONST
UNDERWAY
$
975
AFTER 96
CLAYTON 720817
SR 42/HACON HWY@ UPTON CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .OO MANAGER: M. REYNOLDS .(M)
ATLANTA TIP f CL 79 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1996
$
155
FED SHARE $
124
GA. SHARE $
31
0TH SHARE $
'CLAYTON 721040
SR 54 (& FAYETTE CO) @ MORNING & CAMP CRKS; & FLINT RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .70 MANAGER: D. GODWIN
ATLANTA TIP f CL23/FY2
CONG DIST. 3 ,
.
FUND SOURCE: BRIDGE PROGRAM
FEDERA.L HIGHWAY ADMIN FUND. S
PE 1986 UNDERWAY
ROW 1994
$
552
CONST 1995 $ 3246
FED SHARE $ 2597
GA. SHARE $
649
0TH SHARE $
CLAYTON 721270
SR 42/HACON HWY FM S/ANVILBLOCK RD TO OLD TONY RD/DEKALB RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.30 MANAGER: M, REYNOLDS
ATLANTA TIP f CL10/DK8
CONG DIST. 3 & 11
FUND SOURCE: SURFACE T~SPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1992 UNDERWAY
CONST 1996
$ 4235
FED SHARE $ 3388
GA. SHARE $
847
0TH SHARE $
CLAYTON 721290
SR 85 FM SR 279/FAYETTE N TO 6-LN@ ROBERTS DR/CLAYTON RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE: 4.10 MANAGER: K FULBRIGHT (M)
ATLANTA TIP f CL15/FY4
CONG DIST. 3
.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 1600 AFTER 96
CLAYTON 721295
SR 85 NBL@ CAMP CREEK@ FAYETTE CO LINE
REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : .03
'
MANAGER: K FULBRIGHT (M)
ATLANTA TIP f CL 77 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1996
$
294
FED SHARE $
235
GA. SHARE $
59
0TH SHARE $
.
! r\ll
(O
,,
.... ~,p
~
1!!!!!!!!!!111
. -~ ~
II,
., ... }
"@R
~
= ~
~
~ .i!L~ ~ ~
--,
"'
~
b~
l<.'..i.L'..;,"-i
~
. ~~~~~i
1'.~.~H '.~'!
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 71
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I,NO.
C-L-A-Y-T-O-N-
PROJECT DATA
S-R---1-3-8--FM---W-A-L-T--S-TEP-H-E-N--S--R-D--E-AST
TO--I--7-5-/H--E-N-R-Y---CO-------------------A-T-LA-N--TA-C-O-MT-MI-PE-N-fT-S-C-L--3-1---------------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY
721480 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 3
ROW 1996 $ 5180
PROJECT MILEAGE : 3.55
CONST
AFTER 96
MANAGER: RON BRAZIEL (M)
"FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 721550
SR 85 FM ADAMS DR TO RAMP@ I-75/INCL INTCH@ FOREST PKWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 3.10 MANAGER: N. PASSMORE (M)
ATLANTA TIP f CL 14 CONG DIST. 3 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AFTER 96 AFTER 96
CLAYTON 721555
SR 85@ SR 331 & I-75 RAMP INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
CLAYTON 721860
TARA BLVD@ I-75 (GATEWAY PROJECT) LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST.-LANES: 6 /PROPOSED LANES: 6
MANAGER: J. GRAYBEAL (C)
CLAYTON 731050
SR 85 AT SR 138 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GODWIN
CLAYTON 731060
SR 85 AT VALLEY HILL ROAD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: D. GODWIN.
CLAYTON 731070
TARA BLVD AT OLD DIXIE HWY INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GODWIN
ATLANTA TIP f CL 82 CONG DIST. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 122 CONG DIST. 3 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 80 CONG DIST. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 81 CONG DIST, 3 & 5 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 84 CONG DIST. 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1994 $ 904
FED SHARE$ 814
GA. SHARE$
90
0TH SHARE$
PE NONE $
0
ROW NONE $"
0
CONST 1994
$
120
FED SHARE$
96
GA. SHARE $-
36
OTH SHARE$
60
PE NONE $
0
ROW 1994 $
77
CONST 1995 $ 165
FED SHARE$ 149
GA. SHARE $
17
0TH SHARE$
PE 1994 UNDERWAY
ROW 1994
$
33
CONST 1995 $ 243
FED SHARE $ 219
GA. SHARE $
24
0TH SHARE $
PE 1994 UNDERWAY
ROW 1994
$
61
CONST 1994
$
271
FED SHARE $
271
GA. SHARE $
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 72
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
----------------------------------------------------------------------------
----C-OM--M-E-N-TS----------------------------Y-EA--R--------E-S-T-S--
CLAYTON SR 42 AT DOUBLE BRIDGE ROAD
ATLANTA TIP I CL 88
PE NONE $
0
731090 INTERSECTION IMPROVEMENT / TRAFFIC
(
CONG DIST; 3
ROW 1994
$
50
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
CONST 1994
$
300
MANAGER: D. GODWIN
..
FUND SOURCE: HWY. SAFETY
_ FED SHARE $ 270
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
30
720815 IS AN ASSOCIATED PROJECT.
0TH SHARE$
CLAYTON 731400
SR3/US19&41/TARA BLVD AT CR 537/FREEMAN RD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .31 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP I CL 92 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE- NONE
$
0
ROW NONE $
0
CONST 1994
$
154
FED SHARE$
154
GA. SHARE$
0TH SHARE$
CLAYTON 751730
CR 1342/BATTLE CREEK RD@ JESTERS CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: D. GODWIN
ATLANTA TIP I CL 17 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1991
UNDERWAY
ROW LOCL
CONST 1996
$
409
FED SHARE$ 327
GA. SHARE$
82
0TH SHARE$
CLAYTON 751760
MT ZION RD FM SR 54 SE TO MT ZION BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.45 MANAGER: J. GRAYBEAL (C)
ATLANTA TIP I CL 18 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
10
AFTER ~6
CLAYTON 751770
BATTLECREEK-MT.ZION FM SOUTHLAKE PKWY TO LAKE HARBIN RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.63 MANAGER: J. GRAYBEAL (C)
ATLANTA TIP f CL 19 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$'
10
AFTER 96
CLAYTON 751775
BATTLE CREEK RD FM VALLEY HILL RD TO SOUTHLAKE PKWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.98 MANAGER: D. GODWIN -
ATLANTA TIP I CL 17
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
10
AFTER 96
CLAYTON 751790
PANOLA RD FM BOULDERCREST RD TO STAGECOACH RD RECONSTRUCTION'& WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.10 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f CL16/HE4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
10
AFTER 96
,.
~
' '
~
'
,
,,")
~
!lJ!!l!!!ll
M!!l!!I l!!J!!lll!l!!!I
Si!!!!.WJ
"
~
~
~
~
~
.~Jft.t.~ .,
f:lt!t~~
~ ....
~
(fi~;:,tii
r~:f;i~t..~
k'. :.:,;!l~
..... i;.> .!:::
T'~:'~
;.:, ,.
,\.,,~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 73
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLAYTON ANVILBLOCK RD FM END OF WIDENED SECTION E TOBOULDERCREST RD
ATLANTA TIP f CL .60
PE 1996 $
10
751800 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 3
ROW LOCL
PROJECT MILEAGE : .63
CONST
AFTER 96
MANAGER: D. GODWIN
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 751810
FLINT RIVER RD FM WEBB DR TO TARA BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2.71 MANAGER: D. GODWIN
ATLANTA TIP f CL 20 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
10
AFTER 96
CLAYTON 751850
SR 314/FAYETTE'LE RD FM SR 279 TO NORMAN DR/CR 255 .. FAYETTE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 5.63 MANAGER: M GANNAWAY (M)
1.
CLAYTON 751855
SR 314/FAYETTEVILLE RD FM NORMAN DR/CR 255 TO SR 139 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.53 MANAGER: M GANNAWAY (M)
ATLANTA TIP f CL5/FY8 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 75185X IS AN ASSOCIATED PROJECT.
ATLANTA TIP f CL62/CL5 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$ . 250 AFTER 96
AFTER 96
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
CLAYTON 752060
MORROW RD/CR 1348@ JESTER'S CREEK REPLACEMENT OF .THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .20 MANAGER: D. GODWIN
CLAYTON 752180
CONLEY RD FM OLD DIXIE HWY/SR 3 TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.70 MANAGER: G. ROSS
ATLANTA TIP f CL 78 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 74 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 196
FED SHARE$
157
GA. SHARE$
39
0TH SHARE$
PE 1995 ROW LOCL CONST
$
51
AFTER 96
CLAYTON 752240
FOREST PARKWAY@ GERMAIN INDUSTRIAL BLVD WEST OF SR 42 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .45 - EXIST. LANES: 2 /PROPOSED LANES:. 2
MANAGER: D. GODWIN
ATLANTA TIP f CL 86 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW LOCL
CONST 1995 $ 295
FED SHARE$ 266
GA. SHARE$
30
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 74
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL YEAR
COST ESTS
- - CLAYTON JESTERS CK GREENWAY FM JONESBORO TO MORROW
--------A-T-L-A-N--TA---T-IP---f --C-L--8-9 ---------------------P-E--L-O-C-L-----------
770460 BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST.-;3
ROW LOCL
PROJECT MILEAGE : 4.00.- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1995 $ 1734
MANAGER:.UNKNOWN
FUND SOURCE: TRANS. ENHANCE.
FED SHARE$ 1387
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
347
CLAYTON 770500
HISTORIC DEPOT RESTORATION IN JONESBORO MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
ATLANTA TIP f CL 90 CONG DIST .. 3
FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996 $ . 94
FED SHARE$
75
GA . SHARE $
0TH SHARE$
19
CLAYTON 770600
TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN CLAYTON COUNTY r:-
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
ATLANTA TIP f CL 94 CONG DIST. 3
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
50
ROW NONE $
0
CONST 1995 $ 450
FED SHARE$ 360
GA. SHARE$
0TH SHARE$
90
,. .1 .,
...
...
~-"t
I!!!!!!!!!!
1!!11!!!!!!!1
,P-m
'
~ ,,
COUNTY P. I.NO.
~
~
~
DESCRIPTION PROJECT DATA
~
~
= ~
~
r'
e;~:id
~
~.i(.::.:~
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
i: ~r~
..I...::
,~~
16-Sep-1993 Page 75
FISCAL YEAR
COST ESTS
CLINCH 422055
SR 38/US 84@ SUWANNOOCHEE CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: N. PASSMORE (M)
CONG DIST. 8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 422050 IS AN ASSOCIATED PROJECT.
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
CLINCH 431065
SR 187@ SUWANNOOCHEE CRK OFLW S/HOMERVILLE
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES ..
PROJECT MILEAGE : 1.00
(_
MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992. UNDERWAY
ROW 1994
$
1
CONST 1995 $
275
. FED SHARE $
220
GA. SHARE $
55
0TH SHARE $
CLINCH 43106X
SR 187@ SUWANNOOCHEE CRK/SEE ECHOLS COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 431060 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1994
$
0
CONST 1995
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
GEORGIA DEPARTM_ENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 76
PROJECT LISTING BY COUNTY FY 1994/FY 1996
------ COUNTY P, I.NO. COBB
DESCRIPTION
PROJECT DATA
- - ---
-
PERMANENT OPERATIONS/MAINT,
FACILITY
DEVEL-O-P-M--EN-T
--
FISCAL
COST
PHAS-E---I -------------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
7D7014 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 7 & 6
FUNDS RECIPIENT: COBB COUNTY MANAGER: STEVE KISH
CAPITAL 1994
$ 2725
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$ 2180
FEDERAL TRANSIT ADMIN FUNDS
GA, SHARE$ 273
0TH SHARE$
273
COBB 7D7027
PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS./ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
2594 1297
1297
COBB 7D7028
BUS PURCHASES, P & R LOT DEV., TRANSFER FACILITY, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
6157 4926
616 616
COBB 7D7029
TRANSIT COACHES, PARATRANSIT BUSES, AND PLANNING PROJECTS
TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: COBB COMMUNITY TRANSIT
r.
MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
2736 2189
328 219
COBB 7D7030
TRANSIT COACHES, PARATRANSIT BUSES, AND PLANNING PROJECTS TRANSIT-PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
2736 2189
328 219
COBB 7D7044
PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995
$
896
FED SHARE$
448
GA. SHARE$
0TH SHARE$
448
COBB 7D7045
PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
896
FED SHARE$ 448
GA. SHARE$
0TH SHARE$ 448
,, ,,
'-
... ,,
.,, J
<..,
~
l!!!!I!!! ..,l.l!!!!!!!!!
~
~
~
~
~
~
-= ~ ~'
.. ~ BEi:lt~ ~;,:;,~ t(.ef::: ~:M
"'-
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 77
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
-----------------------------------------
----------------------------------CO-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
COBB
MULTIMODE, SHORT RANGE, FINANCIAL, FACILITIES, ETC. PLANNING
7D7504 SPECIAL STUDIES/ PLANNING
CONG DIST. 6
FUNDS RECIPIENT: COBB COUNTY MANAGER: STEVE KISH
FUND SOURCE: STATE FUNDS
PLANNING 1994
$ 576
FED SHARE$
461
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
57
0TH SHARE$
58
COBB 7V1013
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH
CONG DIST. 7 & 6
CAPITAL 1994
$
65
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
52
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
7
0TH SHARE$
7
COBB 7Vl014
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH
CONG DIST. 7 & 6
CAPITAL 1995
$
67
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
54
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
6
0TH SHARE$
7
COBB 7Vl015
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH
CONG DIST. 7 & 6
CAPITAL 1996
$
70
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
56
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
7
0TH SHARE$
7
COBB 62120X
SR 92 FM E OF SR 754 TO OLD MOUNTAIN PARK RD/CHEROKEE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.95 MANAGER: RAY METTS,
ATLANTA TIP f CH 20 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 621200 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY.
ROW 1995
$
0 ..
CONST 1996 $
0
FED SHARE $
GA. SHARE $
0TH SHARE $
COBB. 712750
WINDY HILL RELIEVER BRIDGE OVER I-75 (PHASE I) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.40 MANAGER: G. ROSS (C)
ATLANTA TIP f C0171 CONG DIST. 6
FUND SOURCE: SURFACE TRAN SP.ORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
5500 4400 1100
COBB 712752
WINDY HILL RELIEVER FM COBB PKWY TO THE I-75 BRIDGE; PHASE 2 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .70 MANAGER: G. ROSS (C)
ATLANTA TIP f CO 171
CONG DIST. 6
.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW 1996 CONST
$ 1200 AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 78
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
C-O-B-B------E-A-S-T---W-E-S-T--C-O-N-N---IN-T-C-H---W-/-I--2--8-5--E
RAMPS
&-A--T-LA--N-TA-RD-
COMMENTS
YEAR
ESTS
BRID--G-E-,PH2------A-T-L-A-N-T-A---T-IP---t-c-o---R---7-0-------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
712760 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED.
CONG. DIST. 6.
ROW
AFTER 96
PROJECT MILEAGE : .00
CONST
AFTER 96
MANAGER: G. ROSS (CM)
FUND SOURCE: NAT'L HIGHWAY
FEDERAL. HIGHWAY ADMIN FUNDS
COBB 712800
KENNEDY INTERCHANGE@ I-75 (CONTRACT l);SEE 71Y800 FOR IM INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (C)
COBB 712804
KENNEDY INTERCHANGE I-75 IMPRV & AKERS MILL RELOC (CT 2)& NH
INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .OO - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (CM)
COBB 712890
I-75/SR 401 FM I-285 NORTH TO SR 5 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 8.38 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E. LAWS
COBB 71297Y
HOV LN SGN ON I-75 & I-85 METRO/CLAYTON;FULTON;GWINNETT
HOV LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
COBB 713020
I-20 FM W OF SIX FLAGS DR TOW OF SR 280 / & FULTON SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
r..
COBB 713060
I-285: SHOULDER REPAIR ADJ TO CONCRETE PAVING&FULTON-DEKALB
SHOULDER WORK/ MAINTENANCE PROJECT MILEAGE : 42.56 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: .
ATLANTA TIP f CO-R 78
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 71Y800 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CO-R 78
CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 138 CONG DIST. 6 .
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 73 CONG DIST. 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712970 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f AT-R 154 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71302X IS AN ASSOCIATED PROJECT.
ATLANTA TIP f R 130 CONG DIST. 5 & 4
FUNb SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
17007 13606
471 3872
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA, SHARE$ 0TH SHARE$
39855 35870
3986
PE NONE $ ROW.NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0 3687 2950
737
PE 1994 $
0
ROW NONE $.
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994
$
950
FED SHARE$
950
GA. SHARE $
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994
$
580
FED SHARE$ 522
GA. SHARE$
58
0TH SHARE$
'.1
I !1
)
.....
,,
,, J
t:""'f
~
~
~ . ~ ,,
~
~
~=--=
~
ftifj
t:.~~ ~
r:tr::t:a
~U!~
!!if4K+.1!i
fi,i~~li!i
/i.::: '4ii"
.)~ l,~~-~~ '
~ . -......,,....... .
''
_.
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 79
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
C-O-B-B-------I--2-8-5--W--E-S-T-S-ID-E---52---S-IG-N--S--N-B--FR-O-M--
I-2-0---TO---I--7-5--.-.-. -FU-L-T-O-N--------------A-T-LA--N-T-AC-O-MT-MI-PE-N-IT-SR---1-3-0---------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--
0
71309X UNKNOWN/ UNKNOWN
CONG DIST. 6'
ROW NONE $
0
PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L, SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
713095 IS AN ASSOCIATED PROJECT.
0TH SHARE$
COBB
I-75 VAR LOCA FROM I-285 SOUTH TO BARRETT PKWY .. CLAY-FULTON
ATLANTA TIP IR 130
PE NONE $
0
71311Z PVMNT MARKINGS/ MAINTENANCE
CQNG DIST. 5
ROW NONE $
0
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
713110 IS AN ASSOCIATED PROJECT.
0TH SHARE$
COBB
0
COMMUNICATION CABLE ON I-85 FM I-75 NORTH TO I-285
ATLANTA TIP IR 168
PE NONE $
0
71314X MISCELLANEOUS IMPROVEMENTS/ TRAFFIC
CONG DIST. 4 & 5
ROW NONE $
0
PROJECT MILEAGE : 10.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: BURT RIDDLE
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
COBB 71Y800
KENNEDY INTERCHANGE@ I-75 -TO SHOW IM FUNDS; SEE 712800 INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (C)
ATLANTA TIP I CO-R 78 CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712800 IS AN ASSOCIATED PROJECT.
PE LOCL ROW 1994 $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
3500 4866 4379
487
COBB 71Y804
KENNEDY INTERCHANGE@ I-75 - TO SHOW NH FUNDS; SEE 712804 INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10
MANAGER:
ATLANTA TIP I CO-R 78 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$
0TH SHARE$
4000 3200
800
COBB 720125
N'SIDE. PKWY@ CHATTAHOOCHEE RVR INCL APPR/& FULTON CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 6 LANES. PROJECT MILEAGE : 1.01 MANAGER: BEN BUCHAN (M)
(_
COBB 720468
SR 6/US 278@ CSX .RR 2.8 MI W/POWDER SPRINGS
BRIDGES/ REPLACEMENT PROJECT MILEAGE : .35 MANAGER: D. GODWIN
ATLANTA TIP I AT12/C024 CONG DIST, 5 & 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72Yl25 IS AN ASSOCIATED PROJECT.
ATLANTA TIP I CO 225
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72Y468 IS AN ASSOCIATED PROJECT.
PE 1981 UNDERWAY ROW 1985 UNDERWAY CONST 1996 $ 2500
FED SHARE$ 2000 GA. SHARE$ 500 0TH SHARE$
PE 1993 UNDERWAY
ROW 1994 $
25
CONST 1995 $ 885
FED SHARE$ 708
GA. SHARE$ 177
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 80
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
---------------------------------------
--------------- --------------------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
SR 8/US 78 FROM DOUGLAS CO TO SR 5/INCL BR@ SWEETWATER CK
ATLANTA TIP f CO 7
PE 1986
UNDERWAY
721100 RECONSTRUCTION & WIDENING FROM 2 LANES T9 5 LANES.
CONG DIST. 7
ROW 1991 UNDERWAY
PROJECT MILEAGE : 1.60
CONST 1994
$ 4023
MANAGER: D. SMITH
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 3218
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
805
0TH SHARE $
COBB 721110
SR 8 FM W OF SR 139 TO RIVERVIEW RD (INCL SIGNALS"@ 4 INTER) RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 4.40 MANAGER: D. SMITH
ATLANTA TIP f CO 6
CONG DIST. 7
.
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 UNDERWAY
ROW 1989 UNDERWAY
CONST 1994
$ 8851
FED SHARE $ 7081
GA. SHARE $ 1770
0TH SHARE $
COBB 721150
SR 3/US 41/COBB PKWY FM AKERS MILL RD TO SPRING ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. PROJECT MILEAGE : .54 MANAGER: G. ROSS (C)
ATLANTA TIP f CO 80 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERALHIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1994
$ 2070
CONST 1996
$ 2130
FED SHARE $ 1704
GA. SHARE $
326
0TH SHARE $
100
COBB 721152
SR 3/US 41/COBB PKWY FM PACES MILL RD TO AKERS MILL ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. PROJECT MILEAGE: .99 MANAGER: G. ROSS (M)
ATLANTA TIP I CO 231
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AFTER 96 AFTER 96
COBB 721250
SR 3/US 41/COBB PKWY FM SPRING RD N TO TERRELL MILL PHl,3 RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE: 1.69 MANAGER: G. ROSS (H)
ATLANTA TIP f CO 81
CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 1311 AFTER 96
COBB 721252
COBB PARKWAY FM S 120 LOOP TON 120 LOOP (PHASE 2) RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE : .69 MANAGER: G. ROSS (M)
ATLANTA TIP f CO 81 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96.
COBB 721256
COBB PARKWAY FM TERRELL MILL RD TO SOUTH 120 LOOP (PH 4,5) RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE : 3.01 MANAGER:G. ROSS (M)
ATLANTA TIP f CO 81 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
,, f "
.,,
,..
l'
~
~
I!!!!!!,
~
~
~
~
~
~
. C~L:i_!i
li:!z:.n;$
~i:f~-'t
ft:.:~;:.--;~:
1:'..
:"''.,.;. :.....
~A,
.
\-~--,.:-<;-.,,
-.-:,.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 81
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
SR 120/ROSWELL RD FM SR 120 LP TO PIEDMONT RD/MARIETTA
ATLANTA TIP f CO 177
PE 1996
$
80
721310 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
CONG DIST. 6
ROW
AFTER 96
PROJECT MILEAGE : 1.50
CONST
AFTER 96
MANAGER: D. SMITH (M)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
COBB 721670
S.MARS HILL EXT FM OLD US 278/SR6 BUS TO SR 120/DALLAS HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.44 MANAGER: D. SMITH (CM)
ATLANTA TIP f CO 123
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW 1996 CONST
$ 8000 AFTER 96
COBB 721680
SR 176/MARS HILL RD FRM SR 120/DALLAS HWY TO STILESBORO RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 4.35 MANAGER: D. SMITH (CM)
ATLANTA TIP f CO 24 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 6685 AFTER 96
COBB 721685
MARS HILL RD FM STILESBORO RD TO SR 3/COBB PARKWAY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.13 MANAGER: D. SMITH (CM)
ATLANTA TIP f CO 124 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 4880 AFTER 96
COBB 721690
N.MARS HILL EXT FM SR 3/COBB PKWY TO I-75/BARTOW COUNTY
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.15 MANAGER: D. SMITH (CM)
ATLANTA rIP f CO 122
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY. ~.... ';,
AFTER 96 AFTER. 96
COBB 72Y125
"STP" FUNDING FOR 720125. NOT A REAL PROJECT. BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 1.00 MANAGER: BEN BUCHAN
COBB 72Y468
SHOWN FOR "BR" FUNDS ONLY .... SEE 720468 FOR PROJECT INFO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,00 MANAGER: UNKNOWN
ATLANTA TIP f AT12/C024 CONG DIST. 6 & 5 .
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 720125 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CO 225
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 720468 IS AN ASSOCIATED PROJECT.
PE 1993
UNDERWAY
ROW 1985 UNDERWAY
CONST 1996
$ 1000
FED SHARE $
800
GA. SHARE $
200
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
500
FED SHARE$
400
GA. SHARE$
100
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATIO~
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 82
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O-B-B------S-R---36-0-/M--A-C-L-A-N-D--R-D--F-M---SR---1-7-6--TO---PO-W--D-E-R--S-P-R-IN-G--S--R-D------------------A-T-L-A-N-T-A--T-I-P--f--C-O--3-9---------------------P-E--1-9-8-6-----U-N-D-ER-W--AY
730860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 6 & 7
ROW LOCL
PROJECT MILEAGE : 4.00
CONST 1994
$ 9477
MANAGER: G. 'ROSS
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 7582
FEDERAL-HIGHWAY ADMIN FUNDS
GA. SHARE$ 1895
0TH SHARE$
COBB 731020
SR 120 LOOP/N. MARIETTA. PARKWAY AT COLE STREET TURN LANES/ TRAFFIC PROJECT MILEAGE : .17 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: D. GODWIN
ATLANTA TIP f co234 CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW LOCL
<:;ONST 1994
$
94
FED SHARE$
85
GA. SHARE$
9
0TH SHARE$
COBB 751430
FRNTG RD 1-WY PAIR FM ROTTENWOOD CK TO NORTHSIDE DR/FULTON RECONSTRUCTION & -WIDENING. NO LANE ADDITION PROPOSED.'.
PROJECT MILEAGE : 1.70 MANAGER: D. SMITH (M)
ATLANTA TIP f CO-R 67 _CONG DIST. 6 & 5
FUND SOURCE_: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
COBB 751670
CR 2845/BELLS FERRY RD FM I-575 N TO CHEROKEE CL/INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: H. ASHMORE
COBB 751675
SHILOH RD REALIGNMENT WITH SHALLOWFORD RD@ BELLS FERRY RD INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE: .43 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: H. ASHMORE (C)
COBB 751890
SR 176@ SR 6 BUS & MACEDONIA RD INCLU UPGRADE SIGNALS
INTERSECTION IMPROVEMENT/ TRAFFIC
.
PROJECT MILEAGE : .38 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GODWIN
COBB 752220
SR 6BU/ELLIOTT RD OVER POWDER SPRINGS CRK W OF POWDER SPS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED-LANES. PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP f CO 71 CONG DIST. 6 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CO 136 CONG DIST. 6 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA. TIP f CO 227 CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I CO 247
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW LOCL
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
3631 2905
726
PE NONE $
0
ROW LOCL
!,'.!ONST 1994
$
357
FED SHARE$ 286
GA. SHARE$
71
0TH SHARE$
PE NONE $
0
ROW 1993 UNDERWAY
CONST 1994
$
403
FED SHARE$
363
GA. SHARE$
40
0TH SHARE$
PE 1995 ROW CONST
$
16
AFTER 96
AFTER 96
:,
<i
!
It '
., ...
~
~
~
~
.
'It
~
~
M~
~
~
~ ~Lli!'II
,:.
~~
t:;:.";~;,;~
~fo-'~
~;,;;,j
~-, l'.1." ~_-!i
r: ::
. ~...
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 83
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O-B-B-------SR---6-B-U-S--R-E-A-L-I-G-N-M-E-N-T---W-IT-H---B-R-O-W-N-S-V-I-L-L-E--R-O-A-D------------------------A-T-L-A-N-T-A--T-I-P--f--C-O--2-4-8--------------------P-E--1-9-9-4-----U-N-D-ER-W--AY
752260 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 7
ROW LOCL
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST 1995 $ 210
MANAGER: D. GODWIN
FUND SOURCE: HWY. SAFETY
FED SHARE$ 189
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
21
0TH SHARE$
COBB 752310
OLD CANTON RD OVER SHEFFER CK TRIBUTARY/SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP t CO 246
CONG DIST. 6
.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
12
ROW LOCL
CONST 1996 $ 802
FED SHARE$
642
GA. SHARE$ 160
0TH SHARE$
COBB 770262
CR 133/HOLT ROAD AT SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP t CO 242
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994 $ 465
FED SHARE$
372
GA. SHARE$
93
0TH SHARE$
I
COBB 770263
CR 257/KURTZ ROAD OVER NOONDAY CREEK
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: ,00
MANAGER:
r..
ATLANTA TIP t CO 244
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994 $ 455
FED SHARE$ 364
GA. SHARE$
91
0TH SHARE$
COBB . 770264
CR 822/BURNT HICKORY ROAD OVER ALLATOONA CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: ,00 MANAGER:
ATLANTA TIP t CO 243
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994 $ 522
FED SHARE$ 418
GA. SHARE$
104
0TH SHARE$
COBB 770291
CR 2793/QUEENS MILL ROAD OVER NICKAJACK CREEK REPLACEMENT OF THE EXISTING BRIDGES($). FROM 2 TO 3 LANES.
PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP t CO 241
CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
700
FED SHARE$ 560
GA. SHARE$ 140
0TH SHARE$
COBB 770350
OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP t CO 239
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
5
AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPT.ION
P. I.NO.
PROJECT DATA
COBB
HIRAM RD/CR 2081 OVER POWDER SPRINGS CREEK
COMMENTS
ATLANTA
TIP
f
----------
CO 245
770360 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 7
PROJECT MILEAGE: .00
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY AD~IN FUNDS
16-Sep-1993 Page 84
FISCAL
COST
YEAR
ESTS
----- .---------------------
PE 1995
$
5
ROW LOCL
CONST
AFTER 96
COBB 770370
FRIENDSHIP CHURCH RD/CR 942 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER:
ATLANTA TIP f CO 240
'CONG DIST. 6
.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
5
AFTER 96
COBB 770470
HISTORIC DEPOT RENOVATION IN KENNESAW ANO WALKWAYS MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
COBB 770601
TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN COBB COUNTY
SIGNALS/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
COBB 770635
6 COBB COMMUNITY TRANSIT BUSES EQUIP. PURCHASE / CAPITAL PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
1.
COBB
DECK OVERLAYS FOR SIX BRIDGES IN DISTRICTS 7 & 3
811040 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00
MANAGER: UNKNOWN
COBB 810040
DECK OVERLAYS FOR SIX BRIDGES IN DIST 7,3; TO SHOW STP FUNDS
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: UNKNOWN
ATLANTA TIP f CO 237
CONG DIST. 6 FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t CO 249
CONG DIST. 6 ,- 7 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CO-R 163 CONG DIST. 6 &- 7 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 6 & 7 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS 810040 IS AN ASSOCIATED PROJECT.
cqNG DIST. 6: & 7 FUND SOURCE:- SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 811040 IS AN_ASSOCIATEO PROJECT.
PE LOCL
ROW LOCL
CONST 1996 $ 156
FED SHARE$ 125
GA. SHARE$
0TH SHARE$
31
PE 1994
$
50
ROW NONE
$
0
CONST 1995
$
950
FED.SHARE$ 760
GA. SHARE$
0TH SHARE$
190
PE NONE $ ROW NONE $ CONST 1995 $'
FED SHARE$ GA. SHARE$
0TH SHARE$
0 0 1320 1056
264
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 1497 1347
150
PE_ NONE $
0
ROW NONE $
0
CONST 1994
$
363
FED SHARE$ 290
GA. SHARE$
73
0TH SHARE$
. . (. ..
,,
,.... ' ~
~
== @.iB ~ , ~ ,, ~
== . : : i
=~ --~
~ -~ ~-a Fii>~
~
~~~
tf~,~~
j,:,-,~)
-~ ,,.::1
l
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 85
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COFFEE SR 135/ US 221/ IN DOUGLAS@ SEVENTEEN MILE RIVER
PE 1986 UNDERWAY
421240 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5 LANES.
CONG DIST. 8
ROW NONE $
0
PROJECT MILEAGE : .20
CONST 1995 $ 1656
MANAGER: J. LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 1325
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
331
421320 IS AN ASSOCIATED PROJECT.
0TH SHARE$
COFFEE 421320
SR 135 FM SR 32/DOUGLAS NE TON DOUGLAS BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 3.10 MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421240 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW LOCL
CONST 1995 $ 2748
FED SHARE$ 2198
GA. SHARE$
550
0TH SHARE$
COFFEE 421340
SR 32/DOUGLAS FM W CL TOE/SR 206 .. INCL 1-WAY PAIR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 3.57 MANAGER: M. REYNOLDS
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 431280 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY ROW 1994 $ 2780 CONST 1995 $ 4402
FED SHARE$ 3522 GA. SHARE$ 880 0TH SHARE$
COFFEE 421345
SR 32 FM W/CR 296 EAST TO WEST CITY LIMITS OF DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.13 MANAGER: M. REYNOLDS(CM)
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 3289 AFTER 96
COFFEE 42134X
SR 32@ 2 LOC/IRWIN & 2 LOC/COFFEE ... SEE IRWIN COUNTY
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LINDSEY
COFFEE 422250
SR 31/US 441@ MILL CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: J. GRAYBEAL
COFFEE 422350
SR 135 AT MCDONALD ROAD IN DOUGLAS
TURN LANES/ TRAFFIC
PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
r..
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421343 IS AN ASSOCIATED PROJECT.
CONG DIST. 8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421910 IS AN ASSOCIATED PROJECT.
ALBANY TIP f H/R-2 CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0.
ROW 1993 UNDERWAY
CONST 1994
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
PE 1994
$
9
ROW 1995 $
10
CONST 1996 $ 289
FED SHARE$ 289
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 86
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O--F-FE-E----S-R---1-3-5-@---IN-T-E-R-S-E-C-T-I-O-N--O--F--CR---5-7-9-; --C-R--1-4-6-; --C-R--1-4-8----------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY
431250 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 2
ROW 1994 $
3
PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1995 $ 383
MANAGER: J. LINDSEY
FUND SOURCE: HWY, SAFETY
FED SHARE$ 345
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
38
0TH SHARE$
COFFEE 431280
LANDSCAPING/ST SCAPE MASTER PLAN DWTOWN DOUGLAS (421340)
LANDSCAPING/ ENHANCEMENT
PROJECT MILEAGE : ; 50 - EXIST. LANES: 0 /PROPOSED LANEiS.: 0
MANAGER: M. REYNOLDS (C)
.
CONG DIST. 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS 4Z1340 IS AN ASSOCIATED PROJECT.
PE LOCL
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE $
0TH SHARE$
0 1520 1216
366 670
COFFEE 442470
SR 31/US 441@ MCNEAL DR/CHESTER AVE
TURN LANES/ TRAFFIC PROJECT MILEAGE : ,14 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LINDSEY
CONG DIST. 8 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1994 $ 146
FED SHARE$ 131
GA. SHARE$
15
0TH SHARE$
COFFEE 442600
SR 158 AT SHIRLEY AVENUE IN DOUGLAS TURN LANES/ TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 8
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
9
ROW 1994 $
10
CONST 1995 $ 289
FED SHARE$ 289
GA. SHARE$
0TH SHARE$
COFFEE 450380
SR 206/PERIMETER RD FM SR 32 TO SR 31 IN DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.72 MANAGER: J. LINDSEY (M)
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$
50
AFTER 96
\
,,
1f",....
,, 'I
D!!!IJ
lffll!!'!!!
. l. l!!M ~ ~
e..M!!
P-i\J
~
=ill
ffil~
~
E@Xff.f,l
.~~~~
H~
~,:-::ii
:~::.~-~
(',:-;<c;;cl
. ~""2i-i~ -.
~~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 87
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-,N--O-.----------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-STS
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE
4B1407 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 8 & 2
FUNDS RECIPIENT: CITY OF MOULTRIE
OPERATING 1994 $
37
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
23
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4Bl408 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH
CONG DIST. 8 & 2
OPERATING 1995 $
38
FUND SOURCE: RURAL TRANSIT
FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4B1409 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH
CONG DIST. 8 & 2
OPERATING 1996 $
40
r_
FUND SOURCE: RURAL TRANSIT
FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
25.
GA. SHARE$
0TH SHARE$
15
COLQUITT SR 37/MOULTRIE FM OKAPILCO CRK TO SR 35 BYP
421840 TURN LANES/ TRAFFIC PROJECT MILEAGE : .60 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J, LINDSEY
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994 $ 675
FED SHARE $
675
GA, SHARE $
0TH SHARE $
COLQUITT SR 133: CSX RR OVER SR 133 0.3 MIN OF SQUARE IN MOULTRIE 422000 BRIDGE REMOVAL/ NEW CONSTRUCTION
PROJECT MILEAGE : 1,00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: J. LINDSEY
PE NONE $
0
CONG DIST. 2
ROW 1994 $
5
CONST 1994 $ 259
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 207
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
52
422005 IS AN ASSOCIATED PROJECT,
0TH SHARE$
COLQUITT SR 37: REMOVE SAG@ OLD CSX RR WEST OF SQUARE IN MOULTRIE 422005 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .75 MANAGER: J. LINDSEY
PE NONE $
0
CONG DIST. 2
ROW NONE $
0
CONST 1994 $ 119
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
95
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
24
422000 IS AN ASSOCIATED PROJECT.
0TH SHARE$
COLQUITT SR 37/W. CENTRAL AVE@ 11TH ST NB&SB IN MOULTRIE & SIGNALS 442490 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .SO - EXIST, LANES: 2 /PROPOSED LANES: 3 MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1994 $
5
CONST 1994
$
125
FED SHARE$ 113
GA. SHARE$
13
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY.1996
16-Sep-1993 Page 88
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
--------------------------------------------------------------------------------------------- .----------------------- -.-----------
COLQUITT CR 477/COOL SPRINGS RO @ INDIAN CK 2 MI NE OF MOULTRIE
PE NONE $
0
442670 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
CONG DIST. 2
ROW LOCL
PROJECT MILEAGE : .19 MANAGER:
..
CONST 1996 $ 104
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
83
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
21
0TH SHARE$
COLQUITT CR 235/JAMES KING RO@ BRIDGE CREEK 470685 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .16 MANAGER: J. LINDSEY
(
CONG [?IST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL-HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994 $ 232
FED "SHARE$ 186
GA. SHARE$
46
0TH SHARE$
,
I
,, ~ .
:-.
.~
. ,
,1
(!'!!!ft
~
~ ~
lfJ ,,..
~
~
-"'-'"'
~l
~ ==
~~
'
!'.fl?Y:Ci
"
~
~.,C6t~
f;~-_.~
~~!-~
..~?4i
(... , .. ~-.:-
I)~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 89
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P .I.NO.
PROJECT DATA
COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE
COMMENTS
YEAR
ESTS
--- --------- ---------------------.----------------------
2Bl098 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 10
FUNDS RECIPIENT: COLUMBIA
OPERATING 1994 $
45
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
27
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
19
COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl099 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1995 $
47
FUND SOURCE: RURAL TRANSIT
FED SHARE$
28
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
19
COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll00 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1996 $
49
FUND SOURCE: RURAL TRANSIT
FED SHARE$
29
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
20
COLUMBIA ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
2C2098 TRANSIT FACILITIES./ CAPITAL FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
. FED SHARE $:
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
COLUMBIA ONE STANDARD VAN AND ONE MOBILE RADIO 2C2099 TRANS.IT FACILITIES / CAP ITAL
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
COLUMBIA I-20@ WHEELER RD/SEE RICHMOND CO 21049X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: NEIL DAVIS
r.
COLUMBIA I-20: REST AREA 162,163; 152, 153 IN MORGAN CO. 21056X REST AREA/ RECST. OR REHAB,
PROJECT MILEAGE : ,00 - EXIST, LANES: 2 /PROPOSED LANES: 4 MANAGER: UNKNOWN
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 210490 IS AN ASSOCIATED PROJECT.
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL.. HIGHWAY ADMIN FUNDS 210560 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION. STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 90
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O--LU--M-B-IA---SR---2-3-2--W-B--M-P--2-.5---3.-6-;-E-B---3-.6---5-.0;WB -4-.2-5---6-.-9-/-IN--C-L---C-LV-T--------------A-U-G-U-S-T-A--T-IP---f--G-I-0-0-6---------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
221410 ADDITION OF A PASSING LANE.
CONG DIST. 10
ROW 1993 UNDERWAY
PROJECT MILEAGE: 2.40
CONST 1994
$ 2800
MANAGER: D_- GRIFFITH
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 2240
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
560
0TH SHARE $
COLUMBIA SR 10/US 78 FM UCHEE CRI< E/CR 258 TO SR 223/RICHMOND CO 221790 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.10 MANAGER: BILL MOSKAL
AUGUSTA TIP f RC-004 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
67
$
70
AFTER 96
COLUMBIA SR 104 FM MP 11.95 S/CR BO .TO SR 47@ POLLARDS CORNER 221800 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.96 MANAGER: D. GRIFFITH
COLUMBIA SR 104 FM MP B.95 S OF CR 515 TO MP 11.95 S OF CR BO 221805 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.00 MANAGER: UNKNOWN
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
AUGUSTA TIP f CC-076 CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY.ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
PE 1992 ROW 1995 CONST
UNDERWAY $ 1392 AFTER 96
COLUMBIA SR 28/FURYS FERRY RD FM RIVERWATCH PKWY TO CR 98/RICHMOND 221860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.11 MANAGER: D. CHURCH (M)
AUGUSTA TIP f RC-CC-048 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 2164 AFTER 96
COLUMBIA SR 28/FURY'S FERRY RD@ BASTON RD/VAUGHN RD 222230 INTERSECTION IMPROVEMENT/ RECST. OR REHAB.
PROJECT MILEAGE : .43 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: D. CHURCH (C,M)
COLUMBIA SR 47 SB FRM MP 2.45 NEAR KEG CREEK SOUTH TO MP 3.88 231350 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 1.43 ~AGER:
AUGUSTA TIP f CC-048
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW 1993 UNDERWAY.
CONST 1994
$ 2443
FED SHARE $ 1954
GA. SHARE $
489
0TH SHARE $
PE 1995 ROW CONST
$
23
AFTER 96
AFTER 96
,, ,.. ~
'-
.,
I~
~
,. = ~
~
., ~
~ ~
~~
~~~l~
=~,;;J:i
~
r15~i!!l~
~i~,,.~
k~,#,
~~i~f.fu
j'; ..-~:
f .. :...
..~~---,r"~
t).\
GEORGIA DEPARTME;~lT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 91
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO.
PROJECT DATA
----- -------------
----------
----------------------------------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
COLUMBIA SR 104/WASHINGTON RD@ CLUB CAR DRIVE (COMMERCIAL DRIVE)
AUGUSTA TIP f CC-076
PE 1994 UNDERWAY
231370 INTERSECTION IMPROVEMENT/ TRAFFIC
.
CONG DIST. 10
ROW LOCL
PROJECT MILEAGE : ,90 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D. GRIFFITH
FUND SOURCE: HWY. SAFETY
CONST 1995
$
670
FED SHARE$
603
FEDERAL'HIGHWAY ADMIN FUNDS
GA. SHARE$
67
0TH SHARE$
COLUMBIA SR 383/BELAIR RD FM FT GORDON GATE TO I-20/SEE RICHMOND CO 25032X RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : ,33 MANAGER: D, CHURCH
AUGUSTA TIP f RC-CC-207 CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 250320 IS AN ASSOCIATED PROJECT.
PE NONE $
0
ROW 1993 UNDERWAY
CONST 1994
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
COLUMBIA CR 145 FM CR 209 TO BASTON; NEW LOC FM OWENS TO OLD EVANS 250470 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.82 MANAGER: D. CHURCH (M)
AUGUSTA TIP f CC-7063 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
COLUMBIA CR 145 FM BASTON TO RIVERWATCH PK;BASTON FM SR 104 TO CR 145 250475 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : ,40 MANAGER: D. CHURCH
AUGUSTA TIP f CC-7063 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBIA SR 104 FM CR 91/SCOTTS WAY NW TOE/CR 515 (INCL BRIDGES) 262080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.21 MANAGER: UNKNOWN
AUGUSTA TIP f CC-076 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBIA CR 136/BASTON RD FM CR 145 N TO SR 28/MARTINEZ 262410 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .72 MANAGER: D. CHURCH
COLUMBIA DAVIS RD EXT FM WASHINGTON RD TO MARTINEZ BLVD 262490 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : .06 MANAGER: D. GRIFFITH
AUGUSTA TIP f CC-7006 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
. AUGUSTA TIP f CC-7006 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
U~DERWAY
.-
ROW LOCL
CONST 1995 $ 3073
FED SHARE$ 2458
GA. SHARE $:> 615
0TH SHARE$
PE 1992 UNDERWAY ROW 1995 $ 1995 CONST 1996 $ 3502
FED SHARE $ 2802 GA. SHARE $ 700 0TH SHARE $
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$
505
FED SHARE$
404
GA. SHARE$
101
0TH SHARE$
PE 1995 ROW LOCL CONST
$
12
AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 92
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COLUMBIA KATHERINE STREET AT CSX RAILROAD . t279476X
PE NONE
$
0
270920 RR XING / TRAFFIC
CONG DIST. 10
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
90
MANAGER: W HESTER
FUND SOURCE: HWY. SAFETY
FED SHARE$
81
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
9
0TH SHARE$
,, ...
'
...
t
l -~
rn!!l'!!ffl
l!!ffl l!ffl!!I ~
1,1
J
1e
~
~
M1ffilti1
~~
~
,, IlQ.:,aa..-=;:;c:JI
~ ...
~~ttt~
j:0'.:.:::~~
....~ /:":-::~~::~ p,w1
I
"'--'
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 93
PROJECT LISTING.BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O-O-K-------I --7-5-@ ---S-R--3-7-/-A-D-E-L---[F-M---1-5-0-0--F-T--W-E-S-T--TO---6-5-0--F-T--E-A-S-T--I-- 7--5-) --------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
410420 INTERCHANGE/ RECST. OR REHAB.
CONG DIST. 8
ROW 1995
$
100
PROJECT MILEAGE : .40 - EXIST. LANES: 2 /PROPOSED LANES: 5
CONST 1996 $ 3071
MANAGER: RON BRAZIEL
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 2764
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
307
0TH SHARE $
COOK 410510
I-75 FM LOWNDES CO LINE TO SR 37 RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.
PROJECT MILEAGE : 7.75 MANAGER: H. ASHMORE(M)
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
COOK 410520
I-75 FM SR 37 TO CR 246 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 9.30 MANAGER: H. ASHMORE(M)
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
COOK 410530
I-75 FM CR 246/COOK TO CR 204 IN TIFT COUNTY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 10.23 MANAGER: H. ASHMORE(M)
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AF-TER 96
COOK 410600
I-75 IMPROVE SANITATION, PARKING & LIGHTS@ REST AREAS 16&7 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER:
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
ROW 1994
$
CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE $.
500 2
1783 1605
178
'
COOK
SR 37/ADEL FM 600' E/I-75 'EAST TO PARRISH ST
421780 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .99
MANAGER: RON BRAZIEL
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1992
UNDERWAY
ROW 1995
$ 3110
CONST 1996 $ 1702
FED SHARE$ 1362
GA. SHARE$
340
0TH SHARE$
r_-
COOK 431430
SR 7 AT NORFOLK SOUTHERN RAILROAO .. f723363R
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: ff.HESTER
CONG DIST:. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST 1994
$
79
FED SHARE$
71
GA. SHARE$
8
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FYl994/FY 1996
16-Sep-1993 Page 94
COUNTY
DESCRIPTION
P.I.NO.
PROJECT DATA
----------- ---- -- COOK
- CR 59 AT NORFOLK SOUTHERN RAILROAD .. f723177P
.
470980 RR XING / TRAFFIC
PROJECT MILEAGE,: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER
,
.
FISCAL
COST
--- -------CO-MME-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PE NONE $
0
CONG DIST. 8
ROW NONE
$
0
CONST 1994
$
90
FUND SOURCE: HWY. SAFETr
FED SHARE$
81
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
9
0TH SHARE$
/
(.
. ~
. ,
1
' ~
. ~
''
~
~
~ ~
.,
J
!.,
~
~j
lt!'.;;~ff ~
~
Eri'iff,~ "
~~ .,
~~
t(&.:':~~
1.. .-:---S:
I.>;-;;~;,;"
t-;~.,,4Y::~
i-11
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 95
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O-W--E-TA----I---8-5--F-R-O-M--M--P --33--T-O--M--P --4-1 --IN-C--L--R-E-P-L--O-F--G-U-A-R-D-R-A-I-L----------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY
311600 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 3
ROW NONE $
0
PROJECT MILEAGE : 8,00 - EXIST. LANES: 4 /PROPOSED LANES: 4
CONST 1994 $ 4821
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$ 4339
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
482
0TH SHARE$
COWETA 31171W
CALL BOXES ON I-85 FM ALABAMA TO SR 74/FULTON ... SEE HARRIS UNKNOWN/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 7 & 3
FUND SOURCE: I-STATE MAINT... FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
COWETA 321310
SR 16, US 27 ALT FM EVANS RD/CR 677 N TO NEWNAN BYPASS
RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. {.
PROJECT MILEAGE : 1.33
MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
683
FED SHARE$ 546
GA. SHARE$
137
0TH SHARE$
COWETA 321450
SR 14/ US 29A/ GREENVILLE ST@ A&WP RR BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : ,34 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 UNDERWAY ROW 1994 $. 309 CONST 1995 $, 1215
FED SHARE $'. 972 GA. SHARE$ 243 0TH SHARE$
COWETA 321850
SR 34_ FM NEAR WHITE OAK CRK E TOE/SR 154 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.80 MANAGER: J. GRAYBEAL
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1994
CONST
UNDERWAY $ 144'1 AFTER 96
COWETA 322060
SR 54/34 FM FISCHER XRDS TO SR54 . TO SR 74 .. FAYETTE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.79 MANAGER: M. REYNOLDS (M)
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY
AFTER 96 AFTER 96
COWETA 322063
SR 54@ LINE CREEK/ALSO FAYETTE CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .01 MANAGER: M. REYNOLDS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 96
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
--- --- ---- P. I.NO.
PROJECT DATA
COWETA SR 34 E/NEWNAN FM SR 154 TO SR 54@ FAYETTE CO LINE
322340 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.11
MANAGER: M. REYNOLDS (M)
FISCAL
COST
-----------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PE 1992 UNDERWAY
CONG DIST. 3
ROW
AFTER 96
CONST
AFTER 96
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
COWETA 322345
SR 34@ SHOAL CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS (M)
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
COWETA . 322390
SR 34/NEWNAN FM SR 34 BYP TO I-85 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .71 MANAGER: M. REYNOLDS
COWETA 322400
SR 34 BYP/NEWNAN FROM SR 70/INCLUDE CSX RR BRIDGE TO SR 34
RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES. r-
PROJECT MILEAGE : 3.09
.
MANAGER: M, REYNOLDS (C)
CONG DIST: 3 FUND soyRcE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST .. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1994 $ 500 CONST 1995 $ 1264
FED SHARE $ 1011 GA. SHARE $. 253
0TH SHARE $
PE 1992 ROW 1995 CONST
UNDERWAY $ 2249 AFTER ,96
COWETA 331730
CR 555 OVER MESSIERS CREEK NORTH OF JCT SR 14 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)
COWETA 331920
CR 547/GORDON RD@ LITTLE WHITE OAK CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .57 MANAGER: GORDON BROWN
COWETA 332090
SR 74/85 AT KEG CREEK EAST OF SENOIA ADDITION OF A PASSING LANE. . PROJECT MILEAGE : .30 MANAGER:
CONG DIST, 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 33Y090 IS AN ASSOCIATED PROJECT.
PE LOCL
ROW LOCL
CQ_NST 1996 $ 137
. FED SHARE $ 110
GA. SHARE$
27
0TH SHARE$
PE 1992 UNDERWAY
ROW LOCL
CONST 1994 $ 341
FED SRARE $ 273
GA. SHARE$
68
0TH SHARE$
PE 1994 ROW 1996 CONST
$
10
$
5
AFTER 96
. '
. ..
~ ,,
-~
~
. ~
.,
~
,
~ ~-
lt'IK~
tfLJ.~W!,
~
~:~ # .,
~= r,,;:zyc'<'.;,
~~ti~
~';~i
r,::;::;:~
rt"'--'.':~:_-i
f""." ... -,~<:
., .
'1
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 97
PROJECT LISTING BY COUNTY FY 1994/FY 1996
I COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O-W--E-TA----S-R--1-4-/-U-S--2-9--A-T--S-R---15-4-------------------------------------------------------------------------------------P-E--N-O-N-E-----$------0
332170 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 3
ROW 1996 $
58
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST
AFTER 96
MANAGER: GORDON BROWN (M)
.
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
COWETA 332180
SR 16 AT SR 54 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST .. LANES: 2 /PROPOSED LANES: 4 MANAGER: GORDON BROWN(M)
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE ROW 1996 CONST
$
0
$
21
AFTER 96
COWETA 33Y090
SR 74 / 85@ KEG CREEK EAST OF SENOIA/ FOR 118 FUNDS UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
COWETA 342830
CR 252/SMOKEY ROAD OVER MOUNTAIN CREEK OVERFLOW REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER:
COWETA 350640
SR 70.N/NEWNAN@ WAHOO CRK & LITTLE WAHOO CR~ REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .38 MANAGER: GORDON BROWN
COWETA 350980
SR 34 AT FIVE EXISTING MEDIAN OPENINGS TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: GORDON BROWN(M)
l
COWETA 370781
CR 157/ROCKAWAY RD IN SENOIA@ CSX RR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .30 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 332090 IS AN ASSOCIATED PROJECT.
PE 1994 ROW 1996 CONST
$
0
$
0
AFTER 96
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS.
PE LOCL
ROW LOCL
CONST 1996 $ 102
FED SHARE$
82
GA. SHARE$
20
0TH SHARE$
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1990 UNDERWAY
ROW 1992 UNDERWAY
CONST 1994
$ 1046
FED SHARE $ 837
GA; SHARE $ 209
0TH SHARE $
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
18
$
1
AFTER 96
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL.HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995 $ 374
FED SHARE$ 299
GA. SHARE$
75
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 98
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. LNO.
PROJECT DATA
C-O-W--E-TA----C-R---1-34-/-T-O-P-E--R-O-A-D--O--V-E-R--P-IN--E--C-REEK
-------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S-PE LOCL
370820 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 3
ROW LOCL
PROJECT MILEAGE : .25
CONST 1994
$
137
MANAGER: GORDON BROWN(C)
F.UND SOURCE: BRIDGE PROGRAM
FED SHARE$ 110
FEDERAL HIGHWAY ADMIN FUNDS
GA .. SHARE $
27
0TH SHARE$
COWETA 370825
CR 252/SMOKEY RD OVER MOUNTAIN CK NE OF CORINTH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994 $ 266
FED SHARE$ 213
GA. SHARE$
53
0TH SHARE$
COWETA 370828
CR 76 OVER LITTLE WHITE OAK CREEK SOUTH OF TURIN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)
CONG DIST. 3
FUND SOURCE:_BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
. 231
185 46
COWETA 370831
CR 160 OVER DEAD OAK CREEK SE OF SENOIA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .25 MANAGER: GORDON BROWN(C).
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
226
FED SHARE$ 181
GA. SHARE$
45
0TH SHARE$
COWETA 370834
CR 122/TURKEY CK RD OVER TURKEY CREEK EAST OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LO.CL CONST 1994 $
FED SHARE$ GA. SHARE$
0TH SHARE$
. 185 148 31
COWETA 370910
CR 157@ LINE CRK & LINE CRK OFLW . . ALSO FAYETTE CO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : 53 .
MANAGER: GORDON BROWN
CONG DIST. 3
FUND-SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 37091X IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 964 FED SHARE$ 771
GA. SHARE$ 193 0TH SHARE$
COWETA 370970
CR 336/WITCHER ROAD OVER WAHOO CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .25
MANA9ER:
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
352
FED SHARE$ 282
GA. SHARE$
70
0TH SHARE$
J
.~
.
,,
~
~
~ ~1~,
I)
,.,.
~~
~Jffil
==:r;:w
t~f~;:!~
~~
.. .. ,~~;~
~
Jittlij~
~\\".
r.f!f'~~;1,
1; ~-:: ~~ffi
..f;r.,.,,-)
~ ..
~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 99
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P-,-I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COWETA CR 261/CORNITH ROAD OVER SANDY CREEK TRIBUTARY
PE LOCL
370980 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES,
CONG DIST. 3
ROW LOCL
PROJECT MILEAGE : ,25
CONST 1994
$
197
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
158
FEDERAL HIGHWAY ADMIN FUNDS
GA, SHARE$
39
0TH SHARE$
COWETA 370990
CR 33/MAJOR ROAD OVER LITTLE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER:
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
115
FED SHARE$
92
GA. SHARE$
23
0TH SHARE$
COWETA 371000
CR 139/NEEDY ROAD OVER PINE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .25 MANAGER:
CONG DIST, 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
144
FED SHARE$ n5
GA. SHARE$
29
0TH SHARE$
(_
COUNTY P. I.No.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1208 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD MANAGER: STEVE KISH
( CONG DIST. 3 & 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOHIN FUNDS
16-Sep-.1993 Page 100
FISCAL YEAR
COST ESTS
OPERATING 1994 $
54
FED SHARE$
30
GA. SHARE $
0TH SHARE$
24
CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1209 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD
MANAGER: STEVE KISH
CONG DIST. 3 & 2
FUND SOURCE: RURAL TRANSIT
OPERATING 1995 $
63
FED SHARE$
35
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$
0TH SHARE$
28
CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1210 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD
MANAGER: STEVE KISH
CONG DIST. 3 & 2
OPERATING 1996 $
65
FUND SOURCE: RURAL TRANSIT
FED SHARE$
36
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$
0TH SHARE$
29
CRAWFORD ONE STANDARD VAN ANO ONE MOBILE RADIO 3C2208 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CRAWFORD MANAGER: STEVE KISH
CONG DIST. 3 & 2
CAPITAL 1994
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
CRAWFORD SR 96/FALL LINE FWY@ FLINT RIVER TRIS 320955 REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .20 MANAGER: J. GRAYBEAL
CONG DIST. 3 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 363130 IS AN ASSOCIATED PROJECT.
PE 1991 UNDERWAY.
ROW NONE $
0
CONST 1996' $ 191
FED SHARE $ 153
GA. SHARE $
38
0TH SHARE $
CRAWFORD SR 42@ CULPEPPER CREEK W OF SR 7 331600 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
1.
CONST 1995 $ 366
FED SHARE $ 293
GA. SHARE $
73
0TH SHARE $
~
'
.'
~
~
., ~ '
~ ,..,,
~
~
-fill,~
~~;~ - ~
-,,,.._,,,,,,.., ~.,
)~
~ir;.::i.lil
j>>l:Mij
t~-.-:--c:,r:~
.~..;.-.:.~:..( ~
,, ;.t
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
CRISP 41025X
I-75 FM SR 159 NEAR ASHBURN TO SR 300@ CORDELE .. SEE TURNER RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .OO MANAGER: H. ASHMORE
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410250 IS AN ASSOCIATED PROJECT.
16-Sep-1993 Page 101
FISCAL YEAR
COST ESTS
PE 1987 ROW 1996 CONST
UNDERWAY
$
0
AFTER 96
CRISP 410260
I-75 FM 1 MILES OF CR 117 TO DOOLY CO LINE RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 7.13 MANAGER: H. ASHMORE
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY_ FEDERAL HIGHWAY ADMIN FUNDS 410265 IS AN ASSOCIATED PROJECT.
PE 1986 UNDERWAY
ROW NONE $
0
CONST 1995 $ 10879
FED SHARE$ 8703
GA. SHARE$ 2176
0TH SHARE$
CRISP SR 30/US 280 MP EB 14.35-15.35; WB 17.0-18.5
PE 1992
UNDERWAY
420605 ADDITION OF A PASSING LANE.
CONG DIST. 8
ROW 1994
$
8
PROJECT MILEAGE : 2.50
(.
CONST 1995 $ 1006
MANAGER: J. LINDSEY
FUND SOURCE: NAT'L HIGHWAY
FED SHARE-$
805
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 201
0TH SHARE$
CRISP 422190
SR 257 NEAR CORDELE@ MIDWAY RD/CR 266 & CR 353 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY (M)
CONG DIST. 8
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
5
ROW 1995 $
3
CONST 1996 $ 547
FED SHARE$
547
GA. SHARE$
0TH SHARE$
CRISP 470841
CR 241@ GUM CREEK/LAKE BLACKSHEAR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994 $ 310
FED SHARE$
248
GA. SHARE$
62
0TH SHARE$
CRISP 471000
REHAB & RESTORE THE HISTORIC DISTRICT OF CORDELE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST; 8 & 2
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 $
6
ROW NONE $
0
CONST 1996 $
92
FED SHARE$
74
GA. SHARE$
1
0TH SHARE$
19
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 102
COUNTY
DESCRIPTION
FISCAL
COST
----- P. I.NO.
PROJECT DATA
DADE ---C-O-U--N-TY O-PE-R-A-TED PUBLIC---T-R-A-NSIT SERVICE
--------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
6B1343 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: DADE MANAGER: STEVE KISH
OPERATINGl994
$
23
FUND SOURCE: RURAL TRANSIT
FED SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
9
DADE 6Bl344
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE KISH
CONG DiST. 9
OPERATING 1995
$
23
FUND SOURCE: RURAL TRANSIT
FED SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
0 GA. SHARE$
0TH SHARE$
9
DADE 6Bl345
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE-KISH
CONG DIST: 9
OPERATING 1996 $
25
FUND SOURCE: RURAL TRANSIT
FED SHARE$
15
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
10
DADE 6C2343
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DADE MANAGER: STEVE KISH
/
C
DADE 610880.
I-24 FM TENNESSEE STATE LINE TO TENNESSEE STATE LINE GUARDRAIL/ MAINTENANCE PROJECT MILEAGE : .40 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER:
CONG DI~T. 9 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CHATTANOOGA-TIP I 23
CONG DIST. 9 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CAPITAL 1994
$
31
FED SHARE$
25
GA. SHARE$
3
0TH SHARE $-
3
PE NONE $
0
ROW NONE
$
0
CONST 1994 $ 734
FED SHARE$
661
GA. SHARE$
73
0TH SHARE$
DADE 610940
I-24 FROM TENN STATE LINE TO TENN STATE LINE
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 9
PROJECT MILEAGE : 4.60 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: L. SEABR09K
FUND.SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED.SHARE$
GA. SHARE$
0TH SHARE$
0 0 2300 2070 230
DADE 621230
SR 136/TRENTON FM CR 52 TO SR 58/US 11 INCL INTERCHANGE@ 59 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE: 1.00 MANAGER: H GANNAWAY
CONG DISJ. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y230 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1995
$
410
CONST 1996 $ 2617
FED SHARE$ 2094
GA. SHARE$ 523
0TH SHARE$
.' ...
~
~
~ ..=~
~,!:~
~:c:-E
= ~
=~ ,:;,~ , ~
1w1-..,.;::1;.;.:.,n,;-;,;;1,,
11.~,(K.~,
~:,~1~i
r~:"' :;
~~'.-: -
"
.. f!,4~:,S.,).";~'i
...
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 103
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ----------------P-R-O-J-ECT--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DADE
SR 136 FM CR 52 TO SR 58; TO SHOW IM FUNDS FOR INT WITH I-59
PE NONE $
0
62Y230 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 9
ROW 1995
$
100
PROJECT MILEAGE : .00
CONST 1996
$
500
MANAGER:
FUND SOURCE: I-STATE MAINT.
FED SHARE$
450
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
50
621230 IS AN ASSOCIATED PROJECT.
0TH SHARE$
DADE 630915
SR 136 E/TRENTON EB 6.4-7.2/EB 10.6-11.85/WB 10.6-11.85 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.05 MANAGER: BILL MCVEY
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$
147
CONST 1995 $ 1613
FED SHARE $ 1290
GA. SHARE $
323
0TH SHARE $
DADE 631070
BURKHALTER GAP RD EXT FM SR 189 TO CR 392/WALKER [& BR] CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: BILL MCVEY (M)
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
(-
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 104
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO,
PROJECT DATA
--------------------------------------
---------------------------------------CO--M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DAWSON SR 9 FM SR 53 TO NEAR CR 54;SR 53 FM S/CR 167 TO CS 501
PE 1993 UNDERWAY
122040 TURN LANES/ TRAFFIC
CONG. DIST. 9
ROW LOCL
PROJECT MILEAGE : 1.00 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST
AFTER 96
MANAGER: L. OWENS (M)
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
r_.
v
,. ,,_
. '
.. 1
~
~
~
~
~
~
~
r,:!i,-.i,!~
~!!!~
., ~ /""'':-, 4
'i, r ~.:.ij
1,::..,
}~::~ r y,~,
r;~ r . .~1;
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
DECATUR 431050
SR 309@ BIG SLOUGH CREEK EAST OF SR 97 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
~ -...~~
..
!
16-Sep-1993 Page 105
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1994
$
5
CONST 1995
$
409
FED SHARE $
327
GA. SHARE $
82
0TH SHARE $
(
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-;-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 106
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
'
----------------------------------------------------------------------------------
DEKALB TRANSIT TRAVELER DEMONSTRATION PROJECT
7D701X TRANSIT PROJECTS/ CAPITAL
CONG DIST. 5
FUNDS RECIPIENT: CITY OF ATLANTA
CAPITAL 1994
$
0
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
DEKALB 7V1016
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY MANAGER: STEVE KISH
(-
CONG DIST. 4 & 11
CAPITAL 1994
$ 100
YUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
80
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
10
0TH SHARE$
10
DEKALB 7V1017
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH
CONG DIST. 4 & 11
CAPITAL 1995
$ 104
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
83
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
11
0TH SHARE$
10
DEKALB 7Vl018
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH
CONG DIST. 4 & 11
CAPITAL 1996
$ 107
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
86
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
10
0TH SHARE$
11
DEKALB 710323
BIKE/PEDESTRIAN WAY - MORELAND AVE TO STONE MTN PARK BICYCLE/PED. FACILITY/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. BOULINEAU
ATLANTA TIP f DK 121 CONG DIST. 4 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
1920 1536
64 320
DEKALB 712120
REDAN RD BR WON OVER I-285 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .20 MANAGER: BILL MOSKAL
ATLANTA TIP f DK-R 35 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL
CONST
UNDERWAY AFTER 96
DEKALB 712450
I-285@ ST MT FWY;L'NCEVILLE HWY; BTWN US 78 & L'NEVILLE HWY
RAMP/ NEW CONSTRUCTION PROJECT MILEAGE : .94 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BILL MOSKAL
ATLANTA TIP f DK-R 107 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 71Y450 IS AN ASSOCIATED PROJECT. -
PE 1989 UNDERWAY ROW 1990 UNDERWAY CONST 1994 $ 3509
FED SHARE$ 2807 GA. SHARE$ 702 0TH SHARE$
,. ,,.
,.
.' ,...
~
~
~
~
Ji?'J;,..oli;'d
li!-~'!IJ
~~Z.2~-~!J
-"""'o.,;
~~
fa~~~~~~
~Ltl
fX;:&;l(i
1:,,'"".,
i:" . ,,.,;
~v..--;,~-;-f
.,,
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
1 6 - s - - 1, - 1 9 9 3 Page 107
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
D-PE-K-.IA-.L-NB-O--. --I--2-0-@ ---L-I-T-H-O-N--IAP-R-O-IN-JED-CU-T-S-TD-RA-IA-TAL---BL-V-D------------------------------------A-T-L-A-N-T-CA-O-M.T-MI-PE-N-fT-S-R--5-9----------------------P-EY-E-A1-R9-9-3-----U-NE-DS-TER-SW--AY
712870 INTERCHANGE/ NEW CONSTRUCTION
CONG DIST. 11
ROW 1995 $ 5840
PROJECT MILEAGE : .40 - EXIST. LANES: 0 /PROPOSED LANES: 4
CONST 1996 $ 2027
MANAGER: G. ROSS
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE $ 1622
FEDERAL HIGHWAY ADHIN FUNDS
GA, SHARE $
405
71Y870 IS AN ASSOCIATED PROJECT.
0TH SHARE $
DEKALB I-285 FM MP O - 21; MP 31.3 - 46.9; MP 56.2-62.7;SEE FULTON
ATLANTA TIP f R 130
PE NONE
$
0
71300X UNKNOWN/ UNKNOWN
CONG DIST. 5
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
0
MANAGER:
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
713000 IS AN ASSOCIATED PROJECT,
0TH SHARE$
DEKALB 71307X
I-285 EB 49 SIGNS FM JONESBORO RD TO GLENWOOD RD ... FULTON
SIGNING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK
ATLANTA TIP f R 130
PE NONE
$
0
CONG DIST. 5 & 6
ROW NONE $
0
CONST 1994
$
0
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
713075 IS AN ASSOCIATED PROJECT,
0TH SHARE$
DEKALB 713100
COTILLIAN DR/SAVOY DR ONE-WAY PAIR ON EACH SIDE OF I-285 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. PROJECT MILEAGE : 1.03 MANAGER:
ATLANTA TIP f DK 117 CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
116
FED SHARE$
104
GA. SHARE$
12
0TH SHARE$
DEKALB 71314Z
COMMUNICATION CABLE ON I-75 FROM I-85 NORTH TO I-285 .. FULTON
MISCELLANEOUS IMPROVEMENTS/ TRAFFIC
t
PROJECT MILEAGE : 5.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
ATLANTA TIP f R 169 CONG DIST. 5 & 6
PE NONE
$
0
ROW NONE $
0
CONST 1994 $
0
MANAGER: BURT RIDDLE
FUND SOURCE: CONG HIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $. GA. SHARE$
0TH SHARE$
DEKALB 713200
I-285 FM INTERCHANGE@ I-20 E TO INTERCHANGE@ I-85 N
BARRIERS/ MAINTENANCE PR9JECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ATLANTA TIP f R 130 CONG DIST. 4
FUND SOURCE: I-STATE CONST. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
165
FED SHARE$ 149
GA. SHARE$
17
0TH SHARE$
DEKALB 71Y450
I-285@ ST HT FWY:L'NCEVILLE HWY: BTWN US 78 & L'NEVILLE HWY
RAMP/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:.BILL MOSKAL
ATLANTA TIP f DI<-R 107 CONG DIST. 4.
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712450 IS AN ASSOCIATED PROJE;CT,
PE 1989 UNDERWAY
ROW 1990 UNDERWAY
CONST 1994
$
250
FED SHARE $ 225
GA. SHARE $
25
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 108
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
-------------------
PROJECT DATA
---
-------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DEKALB I-20@ LITH IND BLVD - SHOWN FOR REMAINING UNFUNDED CST$
ATLANTA TIP f R 59
PE NONE $
-0
71Y870 INTERCHANGE/ NEW CONSTRUCTION
CONG DIST; 11
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 4
CONST 1996 $ 5973
MANAGER: G. ROSS
.
-
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE$ 4778
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 1195
712870 IS AN ASSOCIATED PROJECT.
0TH SHARE $.
DEKALB 721050
SR 124@ STONE MOUNTAIN CRK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .50 MANAGER: D. GODWIN
j
ATLANTA TIP f DK.99 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
DEKALB 721055
SR 124@ YELLOW RIVER/ ALSO GWINNETT CO
REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .03
.
MANAGER: RAY METTS (C/M)
ATLANTA TIP f DK 100 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
1
AFTER 96
DEKALB 72127X
SR 42/MACON HWY FM S/ANVILBLOCK RD TO OLD TONY RD/CLAYTON RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE: .00. MANAGER: M. REYNOLD~
DEKALB 721330
SR 124/ROCK CHAPEL RD FM UNION GR RD N TO PLEASANT HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .90 MANAGER: D. GODWIN
ATLANTA TIP f CL10/DK8 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721270 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 84 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1992 UNDERWAY
CONST 1996 $
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1993 ROW 1996 CONST
UNDERWAY $ 1481 AFTER 96
DEKALB 721350
SR 12/COVINGTON HWY FM SR 124 E TO TURNER HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.20 MANAGER: D. CHURCH (M)
ATLANTA TIP f DK 30 CONG DIST.- 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
DEKALB 721380
SR 857/ROCKBRIDGE RD FM SR 10/MEMORIAL DRE TO HAIRSTON RD
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.20
.
MANAGER: .M. REYNOLDS (M)
r.
ATLANTA TIP f DK 25
CONG DIST. 4
.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
:,
...
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
. .,
~
~
~
~
~~~
~~11.ll
~:m
~-m~
r,~1;~;:_i, . ~ . ~
~;,.~_'1',(1,
i';:-:"'./:N
l:i.:':
('~. ,Gd
... ~_,_.,.._V;:~
>
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 109
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DEKALB SR 857/ROCKBRIDGE RD FM HAIRSTON RD TO ST MTN-LITHONIA RD
ATLANTA TIP f DK 25
PE 1992
UNDERWAY
721390 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 4
ROW
AFTER 96
PROJECT MILEAGE : 1.90
CONST
AFTER 96
MANAGER: M. REYNOLDS (M)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 721400
ASHFORD-DUNWOODY/JOHNSON FERRY FM PTREE IND BLVD TO I-285 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.80 MANAGER: G. ROSS
DEKALB 721405
ASHFORD-DUNWOODY RD@ NANCY CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .02 MANAGER: G. ROSS
DEKALB 721530
SR 124 FM ROCKBRIDGE RD TO CENTERVILLE-ROSEBUD RD/GWINNETT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.10 MANAGER: RAY METTS (C/M)
ATLANTA TIP f DK 22
CONG DIST. 4 & 5
.
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
721405 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 22 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721400 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f GW 76 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
PE 1992 ROW 1996 CONST
UNDERWAY $ 6737 AFTER 96
DEKALB 721535
SR 124 FM PLEASANT HILL RD TO ROCKBRIDGE RD/ INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.92 MANAGER: D. GODWIN
ATLANTA TIP f DK 85 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 2327 AFTER' 96
DEKALB 721880
STONE MOUNTAIN FREEWAY AT HUGH HOWELL ROAD INTERCHANGE INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.20 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: NEIL DAVIS
DEKALB . SR 212/BROWNS MILL RD@ POLE BRIDGE CRK 730970 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES .
.PROJECT MILEAGE : .15
MANAGER: D. GODWIN
ATLANTA TIP f DK-R 117 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 98 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
10
CONST 1996
$ 3267
FED SHARE $ 2614
GA. SHARE $
653
0TH SHARE $
PE 1993 UNDERWAY
ROW 1994
$
10
CONST 1995
$
498
FED SHARE $
398
GA. SHARE $
100
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 110
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
------------------------- ----------
DEKALB REDAN RD@ SNAPFINGER CRK
---------- ------- -----A-T-L-A-N.-T-AC-O-MT-MI-PE-N-fT-S-R-T-P--D-K---2-3-----------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY
751270 REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
CONG DIST . 4
ROW LOCL
PROJECT MILEAGE : .10 MANAGER: BILL MOSKAL
FUND SOURCE: BRIDGE PROGRAM
CONST
AFTER 96
r_
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 751320
CR 5189/ROCKBRIDGE RD@ SNAPFINGER CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .28 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f DK 101 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
DEKALB 751340
CR 23/FAYETTEVILLE RD@ SUGAR CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .50 MANAGER: D. GODWIN
DEKALB 751370
CHAMBLEE-TUCKER RD FM NEW P'TREE RD TO BUFORD HWY/SR 13 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.40 MANAGER: D. GODWIN
ATLANTA TIP f DK 111 CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 1 C_ONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGH.WAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 421
FED SHARE$ 337
GA. SHARE$
84
0TH SHARE$
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96'
DEKALB 751380
CHAMBLEE-TUCKER RD FM I-85 TO I-285 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.30 MANAGER: D.SMITH (C)
DEKALB 751440
WINTERS CHAPEL RD FM OAKCLIFF RD TON/CHICOPEE RD(& SIGNAL) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE.: .90 MANAGER: G. ROSS
DEKALB 751445
WINTERS CHAPEL-OAKCLIFF RD CONN@ SOUTHERN RR BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .08 MANAGER: G.ROSS
ATLANTA TIP f DK 17. CONG DIST. 4
FUND SOURCE: I-STATE CONST. FEDERAL.HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 44 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 75Y440 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 94 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 751440.IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 5009
FED SHARE$ 4258 GA. SHARE$ 751 0TH SHARE.$
PE 1992 UNDERWAY
ROW LOCL CONST 1995
-'
$ 6609
FED SHARE$ 5287
GA. SHARE$ 1322
0TH SHARE$
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
....
... >
-~
-~
-==
~~
~
~
~
lffl~-4~5
~
"'-"''=-41
~
.......,;,,~
ln-'
.,-.
~-:- ,--._._~\
~:;7r,:::., ...:.-1
t:-:=T:~~~
~~~-it~
- ~~--..";:-".!
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
16-Sep-1993 Page 111
FISCAL YEAR
COST ESTS
DEKALB 751490
SR 859/COOLEDGE-BROCKETT RD FM E PONCE DE LEON TO ST MTN FWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .30 MANAGER: D. GODWIN
ATLANTA TIP f DK 79 CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1996
$ 1307
FED SHARE $ 1046
GA. SHARE $
261
0TH SHARE $
DEKALB 751495
SR 859/COOLEDE-BROCKETT RD FM STONE MTN FWY-SR 8/W SIGNALS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.00 MANAGER: D. GODWIN
ATLANTA TIP f DK 79 CONG DIST. 4 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$
42
AFTER 96
AFTER 96
DEKALB 751940
CR 5109/STEPHENSON RD@ CROOKED CRK
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .18
.
MANAGER: D. GODWIN
ATLANTA TIP f DK 97 CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 752100
EAST PONCE DE LEON AT RAYS ROAD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .28 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN
ATLANTA TIP f DK102 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 752110
SR 154/MEMORIAL DRIVE@ WHITEFOORD AVE. INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .12 - EXIST. LANES: 3 /PROPOSED LANES: 4
MANAGER: D. GODWIN
ATLANTA TIP f AT 29 CONG DIST. 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 752470
SR 236 AT NORTHLAKE PARKWAY AND SIGNAL SYSTEM TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP f DK 119 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 752480
SR 155/CANDLER RD FM COLUMBIA/CLIFTON SPR TO SR 260 GLENWOOD
SIGNALS/ TRAFFIC PROJECT MILEAGE : 3.60 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP f DK 120 CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1991
UNDERWAY
ROW LOCL
CONST 1995 $ 272
FED SHARE$ 218
GA. SHARE$
54
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1995
$
158
FED SHARE$
142
GA. SHARE$
16
0TH SHARE$
PE NONE $
0
ROW 1994
UNDERWAY
CONST 1994
$
91
FED SHARE$
82
GA. SHARE$
9
0TH SHARE$
PE 1994
$
7
ROW 1995 $
10
CONST 1996
$
231
FED SHARE$
208
GA. SHARE$
23
0TH SHARE$
PE NONE
$
0
ROW NONE
$
0
CONST 1994
$
384
FED SHARE$
346
GA. SHARE$
38
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 112
----------------------------------------------------------------- COUNTY
P. I.NO.
DESCRIPTION PROJECT DATA
DEKALB WINTERS CHAPEL RD FM OAKCLIFF RD TON/CHICOPEE RD (&SIGNAL)
COMMENTS ATLANTA TIP f DK 44
FISCAL YEAR
PE 1992
COST ESTS
UNDERWAY
75Y440 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
CONG DIST. 4
ROW LOCL
PROJECT MILEAGE : .00 MANAGER: G. ROSS
FUND SOURCE: OLD URBAN SYSTEM
CONST 1995 $
1
FED SHARE$
1
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
751440 IS AN ASSOCIATED PROJECT.
'0TH SHARE $
DEKALB 770280
CR 690/ALFORD RD@ CROOKED CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .25 MANAGER: D. GODWIN
ATLANTA TIP I DK 96
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1991 UNDERWAY
ROW LOCL
CONST 1994
$
220
FED SHARE$
176
GA. SHARE$
44
0TH SHARE$
DEKALB 770440
PEDESTRIAN/LANDSCAPING ALONG US 278 IN AVONDALE BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
l.
DEKALB 770480
SOUTH DECATUR TROLLY LINE CONVERSION BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : 00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
DEKALB 770530
D'TOWN ST'SCAPES IN DECATUR;SIDEWALKS,X-WALKS,BENCHES,TREES MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ATLANTA TIP f DK 114 CONG DIST. 4
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t DK 116
CONG DIST. 4 & 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I DK 115
CONG DIST. 4
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1995 $
90
FED SHARE$
72
GA. SHARE$
0TH SHARE$
18
PE LOCL
ROW LOCL
CONST 1996
$
625
FED SHARE$
500
GA. SHARE$
0TH SHARE$
125
PE LOCL
ROW LOCL
CONST 1994
$
750
FED SHARE$
600
GA. SHARE$
0TH SHARE$ 150
DEKALB 770603
TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN DEKALB COUNTY
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
ATLANTA TIP f DK 118 CONG DIST. 4 & 11
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $'
ROW NONE $
CONST.1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
50 0
1108 886 1 221
DEKALB 770640
CR 299/N CLARENDON AVE AT CSX RAILROAO ... f279941U
RR XING / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$-
0
ROW NONE $
0
CONST 1994
$
81
FED SHARE$
73
GA. SHARE$
8
0TH SHARE $
t
o
. '
~
-~
~~
=I C=-
~~
~
~mH~
f~l~i}';1~;
~~
1,~ . -~'~1
rt:~:fJ
~.:~
~i.l~
~~
~
"
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
DEKALB 770650
CR 899/LAREDO DR AT CSX RAILROAD ... f279944P
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
i~~~-~1
t
.,,
16-Sep-1993 Page 113
FISCAL YEAR
COST ESTS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
76
FED SHARE$
68
GA. SHARE$
8
0TH SHARE$
DEKALB 81104X
OVERLAYS FOR 013-0013,089,0089,119-0002,119-0040,139-0004
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 10 & 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
C .
I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
Page 114
COUNTY
DESCRIPTION
--P-.I-.-NO--. ---
PROJECT DATA
--
DODGE COUNTY OPERATED PUBLIC TRANSIT SERVICE
FISCAL
COST
.
---- COMMENTS----------------------------Y-E-A-R--------E-S-T-S--
2Bll03 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 8
FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
OPERATING 1994 $
75
FUND SOURCE: RURAL TRANSIT
FED SHARE$
45
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
30
DODGE 2Bl104
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
CONG DIST. 8
OPERAT-ING 1995 $
79
FUND SOURCE: RURAL TRANSIT
FED SHARE$
47
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
32
DODGE 2Bl105
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1996 $
84
FUND SOURCE: RURAL TRANSIT
FED SHARE$
50
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
34
DODGE 2C2103
ONE CONVERSION VAN, ONE STANDARD VAN, AND TWO MOBILE RADIOS
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
CONG DIST. 8
CAPITAL 1994
$
50
FUND SOURCE: RURAL TRANSIT.
FED SHARE$
40
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
0TH SHARE$
5
DODGE 2C2104
ONE CONVERSION VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
CONG DIST. 8
CAPITAL 1995
$
30
FUND SOURCE: RURAL TRANSIT
FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
DODGE 221970
SR 87/US 23 /EASTMAN FROM NW OF CR 141 TO NW OF CR 332 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE : .60 MANAGER: D. GRIFFITH
DODGE 231340
r . SR 27@ SR 87, SECOND AVE, SR 46 IN EASTMAN SIGNALS/ TRAFFIC PROJECT MILEAGE : .. 50 - EXIST. LANES: 3 /PROPOSED LANES: 3 MANAGER: BURT RIDDLE
CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
381
FED SHARE $ 305
GA. SHARE $
76
0TH SHARE $
PE NONE $
0
ROW 1994 $
5
CONST 1994 $ 150-
FED SHARE$ 150
GA .. SHARE $
0TH SHARE$
:t-
..
. .,
~
~
~
~
~
~
R21)W.:JJ
~~
~
j,,:;.~:-~li.l
1"&:'f':.i '(".-.::~,~~
li1~:~-~~1
1/rr:;:~~1~-~
~i<;~,j
~,i;.:,;.'-,:,._-:n;-,!
"
$'
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 115
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--, ----------------PR--O-JE-C--T--D-A-T-A------.---------------------------------------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
DOOLY CITY OPERATED PUBLIC TRANSIT SERVICE
3Bl218 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 2
FUNDS RECIPIENT: CITY OF VIENNA
OPERATING 1994
$
13
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
5
DOOLY 3B1219
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH
CONG DIST. 2
I
OPERATING 1995 $
13
FUND SOURCE: RURAL TRANSIT
FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
5
DOOLY 3B1220
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1996 $
13
FUND SOURCE: RURAL TRANSIT
FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
5
DOOLY 3B1422
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1994 $
32
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
19
GA. SHARE$
0TH SHARE$
13
DOOLY 3B1423
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1995 $
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
20
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
13
DOOLY 3B1424
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1996 $
34
FUND SOURCE: RURAL TRANSIT
FED SHARE$
20
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
DOOLY 3C2218
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH
CONG DIST . .2
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 116
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
D-O-O-L-Y-----O-N-E--C-O-N--V-E-R-SI-O-N--V-A-N--W--IT-H--L--IF-T--A-N-D--O--N-E-M--O-B-IL-E---R-A-D-IO--------------------------------------------------------------------------
3C2422 TRANSIT FACILITIES/ CAPITAL
CONG DIST. 2.
FUNDS RECIPIENT: CITY OF UNADILLA
CAPITAL 1994
$
32
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
DOOLY 3C2423
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1995
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
DOOLY 311610
I-75 UPGRADE REST AREAS fl3 & 14(DOOLY) AND f 22 (MONROE) REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER:
L
CONG DIST. 2 & 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
ROW NONE $
CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
172
0 5730 5157
573
DOOLY 321610
SR 90@ SANDY MOUNT;LITTLE PENNAHATACHEE;TURKEY CK & TRIB REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PR0JECT MILEAGE : 1.20 MANAGER: GORDON BROWN
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1990 UNDERWAY
ROW 1995 $
32
CONST 1996 $ 173.4
FED SHARE$ 1387
GA. SHARE$ 347
0TH SHARE$
DOOLY 371210
CR 25 OVER HOGCRAWL CREEK 9 MI WEST OF UNADILLA REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. PROJECT MILEAGE : .21 MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
10
ROW LOCL
CONST 1996 $ 290
FED SHARE$ 232
GA. SHARE$
58
0TH SHARE$
,,
,-
. '
~
~
~ .. ~_i:~,
-=,.,..-_c;;,
r!'@.!!u~
~
tlfl.;t"'R!.J
r;;M"l'!,l
!.:." ..:::j
~--:f:1
"
,'~'~. ,'.~~.
:,T,J
l ' ' , ,.. ,.,.,:,
... """~~~-/
~-.~,,...~.
t
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 117
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O-.----------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGHERT WHEELCHAIR LIFTS FOR PARATRANSIT VEHICLES (ADA)
401013 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 2 & 8
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
CAPITAL 1995
$
5
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
5
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
DOUGHERT WHEELCHAIR LIFTS FOR TRANSIT COACHES (ADA) 401015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 2 & 8
CAPITAL 1996
$
50
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
45
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
DOUGHERT CONCRETE REPLACEMENT FOR TRANSIT STATION 404010 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM. MANAGER: STEVE KISH
CONG DIST. 2 & 8
CAPITAL 1994
$ 166
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
133
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
16
0TH SHARE$
17
DOUGHERT VEHCLES, SHELTERS, FACILITY IMP., CAP. MAINT., ETC. 404011 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 2 & 8
CAPITAL 1995
$ 101
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
81
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
10
0TH SHARE$
10
DOUGHERT FACILITY IMP., CAP. MAINT., SHELTERS, FURNITURE, EQUIP., ETC
404012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
,
MANAGER: STEVE KISH
CONG DIST. 2 & 8
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
1527 1222
152 153
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY
404016 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL'TRANSIT ADMIN FUNDS
OPERATING 1994 $ 780 FED SHARE$. 390 GA. SHARE$
0TH SHARE$ 390
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY 404017 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DI~T. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ 717 FED SHARE$ 359
GA. SHARE $
OT~ SHARE$ 359
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 118
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--, -I.-N-O--, ---------------P-R-O-J-E-C-T-.-D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY
4D4018 TRANSIT PROJECTS/ OPERATIONS
CONG DIST. 2 & 8
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
OPERATING 1996 $ 737
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
FED SHARE$
369
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
369
DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 4V1010 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1994
$
20
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
OOUGHERT ELDERLY AND DISABLED VEHICLES ANO EQUIPMENT 4V1011 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA
MANAGER: STEVE KISH
CONG DIST, 8 & 2
CAPITAL 1995
$
21
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
17
FEDERAL TRANSIT.ADMIN FUNDS
GA, SHARE$
2
0TH SHARE$
2
DOUGHERT ELDERLY ANO DISABLED VEHICLES AND EQUIPMENT 4V1012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH
DOUGHERT SR 91/ PHILEMA RO IN ALBANY@ MUCKAFOONEE CREEK 421270 REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDEO LANES.
PROJECT MILEAGE :- .26 MANAGER: 0, CHURCH
CONG DIST. 8 & 2
CAPITAL 1996
$
22
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
ALBANY TIP I B-2
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421420 IS AN ASSOCIATED PROJECT.
PE 1986 UNDERWAY
ROW NONE $
0
CONST 1995 $ 1555
FED SHARE $ 1244
GA. SHARE $
311
0TH SHARE $
DOUGHERT PHILEMA RD FM SR 133 TO LEE CO LINE/EXCL BR@ MUCKAFOONEE CK 421420 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1,90 MANAGER: O. CHURCH (M)
ALBANY TIP I H/R-9
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421270 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY ROW LOCL
CONST 1995 $ 2408 FED SHARE$ 1926 GA. SHARE$ 482 0TH SHARE$
OOUGHERT SR 520/US 82/0GLETHORPE BLVD FM US 19 TO LOFTUS ST/ALBANY 421580 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : ,50 MANAGER: D. CHURCH
ALBANY TIP I HR/11
CONG DIST. 8
GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995 $ 946
FED SHARE $ 757
GA. SHARE $
189
0TH SHARE $
,.
,
.. ,-,
~
~
~ ~
'I
~
Q='ll
P..!!1~
~
~-;,!i!i"@ L ~
}!.. .-~~~:
f,
~-:",>~ I)
t'"' ~fti
l;::;.,:: . . . . .::
\(,~~-'-.',...,"l~{
i'i~
... i . , - . - , ..._,;;,'.
.. '
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-,1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 119
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
D-PO--U. -GI.-HN-EOR-T-. -S-R--3-/-U-S---19--A-T--P-PRR-OO-C-JET-CO-TR---D&-A-GTA-A-M-B-L-E--IN---A-L-BA-N-Y---------------------------A-L-BA--N-Y-C-OT-MI-PM-E-IN-T-HS-/-R---2----------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--0
422330 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 2
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
116
MANAGER:
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
116
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
DOUGHERT CR 459/COUNTY LINE RD@ PINEY WOOD CRK 431200 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .19 MANAGER: J. LINDSEY
ALBANY TIP I B-1
CONG DIST. B
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$
427
FED SHARE$
342
GA. SHARE$
85
0TH SHARE$
DOUGHERT RADIUM SPRINGS RD FM GARDEN HILL DR TO WHITEHEAD RD
450320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.10
MANAGER: D. CHURCH (C)
ALBANY T~P I H/R-10
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
1674 1339
502 837
DOUGHERT CR 539/DAWSON RD@ SR 520/US B2/LIBERTY XWAY ... & LEE CO 450400 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : 1.00 MANAGER: D. CHURCH
ALBANY TIP I H/R-13
CONG DIST. B
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW LOCL
CONST
UNDERWAY AFTER 96
DOUGHERT D'TOWN ENHANCEMENT OF ALBANY/TRAILS,LANDSCAPING,RAIL TERMINA 470910 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ALBANY TIP I TSM-5
CONG DIST, 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
DOUGHERT BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT f4
470990 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 $ ROW 1996 $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
so
. 200 1844
1475
50 419
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0 1242
994 248
GEORGIA DEPARTMENT OF TRANSPORTATION_
16-Sep-1993
STATE TRANSPORTATIQ'1 IMPROVEMENTS PROGRAM
Page 120
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P.I.NO.
PROJECT DATA
---------------------- ---------
--
DOUGLAS COUNTY OPERATED PUBLIC VANPOOL SERVICE
FISCAL
COST
- ------.-- COMM-E-N-TS----------------------------Y-E-AR---------E-S-T-S--
7Bl393 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 7
FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
OPERATING 1994 $
13
FED SHARE$
50
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
13
DOUGLAS 7Bl394
COUNTY OPERATED PUBLIC VANPOOL SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH
CONG DIST. 7
OPERATING 1995
$
18
FUND SOURCE: RURAL TRANSIT
FED SHARE$
66
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
18
DOUGLAS 7Bl395
COUNTY OPERATED PUBLIC VANPOOL SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPI:ENT: DOUGLAS MANAGER: STEVE KISH
CONG DIST. 7
OPERATING 1996 $
18
FUND SOURCE: RURAL TRANSIT
FED SHARE$
68
FEDERAL.TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
18
DOUGLAS 707031
PARK AND RIDE LOT I-20 & CHAPEL HILL RD.
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT- ADMIN FUNDS
CAPITALl994
$ 587
FED SHARE$ 470
GA. SHARE$
59
0TH SHARE$
59
DOUGLAS 7D7032
TRANSIT PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH
CONG. DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1995
$ 211
FED SHARE$ 169
GA. SHARE$
21
0TH SHARE$
21
DOUGLAS 7D7033
CAPITAL PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY
MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$ 211
FED SHARE$ 169
GA. SHARE$
21
0TH SHARE$
21
DOUGLAS 7Vl019
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENICES IN DOUGLAS COUNTY
MANAGER: STEVE KISH
CONG DIST . .-. 7
CAPITAL 1994
$
11
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
9
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1:
0TH SHARE$
1
.,
,-
.. ,.
,
-
lli,ii9
~
~ ,~
~~
I!!!!~~~
~~!~!~!
~~
~r::~:!'l
f::.....~
~a.t'iil ~
C
~r.r(~-.-...;--:'.
t .. : . ..:~
. .~ ~ ~
~--~/.i.,j t1,1
p-;-;,, 4.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 121
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-,-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGLAS ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
7V1020 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 7
FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY
CAPITAL 1995
$
11
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
9
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
DOUGLAS 7Vl021
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL . FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY
MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1996
$
12
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
10
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
DOUGLAS 720970
SR 92 EXT/DOUGLASVILLE FM SR B NW TO SR 92 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 1.20 MANAGER: BILL MOSKAL
ATLANTA TIP f DO 2
PE 1996 $- 150
CONG DIST. 7
ROW
AFTER 96
r.
CONST
AFTER 96
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
DOUGLAS 721320
BANKHEAD HWY FM SWEETWATER RD E TO THORNTON RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 1.30 MANAGER: D. SMITH
ATLANTA TIP I DO 16
CONG DIST. 7
FUND SOURCE: SURFACE.TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AF.TER 96 AFTER 96
DOUGLAS 721420
SR 92 FM S/SR 166 NE TO LAKE MONROE RD/CR 140 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.26 MANAGER: N. PASSMORE (M)
ATLANTA TIP f DO 28 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 1095~
AFTER 96
DOUGLAS 721435
SR 5/BILL ARP RD@ DOG RIVER SW OF DOUGLASVILLE REPLACEMENT OF THE EXISTING BRIDGES{$). FROM 2 TO 3 LANES.
PROJECT MILEAGE : .20 MANAGER: D. GODWIN
DOUGLAS 721470
SR 5 N&SB FM $/SWEETWATER RD TO S/DOG RIVER BRIDGE ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1,75 MANAGER: D, GODWIN
ATLANTA TIP f DO 42 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DO 38 CONG DIST. 7.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
1
CONST 1995
$
913
FED SHARE $ 730
GA. SHARE $ 183
0TH SHARE $
PE 1992
UNDERWAY
ROW 1993 UNDERWAY
CONST 1996 $ 790
FED SHARE $
632
GA. SHARE $
158
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 122
COUNTY
P.
-
I.N-O--. -----
DESCRIPTION
PROJECT DATA
--
-----
FISCAL.
COST
-----------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGLAS SR 8/US 78/BANKHEAD HWY FM SR 92 EAST TO CR 15/SWEETWATER RD 721590. RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
ATLANTA TIP f DO 29 CONG DIST. 7
PE 1992 ROW
UNDERWAY AFTER 96
PROJECT MILEAGE : 5.90
CONST-
AFTER 96
MANAGER: D. SMITH (M)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
DOUGLAS 721770
SR 166 FM OLD LOWER RIVER RD/DOUGLAS TO SR 70/FULTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2,91 MANAGER: RON BRAZIEL (M)
ATLANTA TIP f DO 19 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER96
AFTER 96
DOUGLAS 742800
LOWER RIVER RD FM SR 92 TO CAMP CREEK PKWY/FULTON RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 6,30 MANAGER: K FULBRIGHT {M)
ATLANTA TIP f DO 21 CONG DIST. 7 & 5
FUND SOURCE: SURFACE TRANSPORT. rEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$ 250 AFTER 96
DOUGLAS 751820
DOUGLAS BLVD EXT FM CR 814 TO CR 115 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 1,80 MANAGER: RON BRAZIEL (M)
ATLANTA TIP f DO 32 CONG DIST. 7
.FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL .90NST
$ 103 AFTER 96
DOUGLAS 751825
DOUGLAS BLVD EXT FM CR 142 TO CR 814 CONSTRUCTIONOF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.00 MANAGER: RON BRAZIEL (H)
ATLANTA TIP f DO 31 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1996
ROW LOCL CONST
$ 103 AFTER 96
DOUGLAS 751970
CR 24/N BURNT HICKORY RD@ GOTHARD CREEK
1.
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .20
MANAGER: D. GODWIN
DOUGLAS 770162
CR 39/0LD ALABAMA RD@ SWEETWATER CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER: D. GODWIN
ATLANTA TIP f DO 41 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DO 39 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$
386
FED SHARE$
309
GA. SHARE$
77
0TH SHARE$
PE 1992
UNDERWAY
ROW LOCL
CONST 1994
$
644
FED SHARE$ 515
GA. SHARE$
129
0TH SHARE$
,,
\.
<
.. ,,,
~
~
~
't-."/=i'~~
'
!if~
!l~~:ffi
1,~
[lr!i!iffi
~;frr]
,. li.'",:~~;e, ~:-.:!.l!l ~ 12
~~
Jb,.~:ir:~~
~
!---;,-~ !"
4,,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 12.3
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EARLY US 27@ WAMBLE CREEK SOUTH OF BLAKELY
PE 1992 UNDERWAY
421640 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 2
ROW NONE
$
0
PROJECT MILEAGE : .50
GRIP PROJECT
CONST 1996
$
230
MANAGER: RON BRAZIEL (M)
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
184
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
46
422210 IS AN ASSOCIATED PROJECT.
0TH SHARE $
EARLY 422090
SR 62/BLAKELY FM WEST OF SR 200 TO EAST OF SR 62 BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.70 MANAGER: J. LINDSEY (M)
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
10
AFTER 96
EARLY 431320
SR 1 OVER BLUE CREEK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
10
$
1
AFTER 96
C
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 124
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------CO-M--M-E-N-T-S-----------------.---------Y-E-A-R--------E-S-T-S--
ECHOLS SR 89/US 441 AT LONG CREEK
PE 1996
$
10
422425 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
CONG DIST. 8
ROW NONE
$
0
PROJECT MILEAGE : .00
CONST
AFTER 96
MANAGER: N. PASSMORE (M)
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
422420 IS AN ASSOCIATED PROJECT.
ECHOLS 431060
SR 187@ SUWANNOCHEEE CRK /ALSO CLINCH COUNTY REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : 1.00
MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$ 1719
CONST 1995
$ 1366
FED SHARE $ 1093
GA. SHARE $ 273
0TH SHARE $
(.
. ,,
,.,
,:
~
~ -~
.~ , ~
~,~!ll
~
~.'!.Ii@
iel'!f!.~!!
~~l~
,, ,. ~ ,,.-,.~(::'!
~
~i'i."1
r.cr-:~:..i-.,
~
~. 111
,.._.... .,,,: ~a
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 125
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O- .---------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
EFFINGHA I-95 FM N/I-16 IN CHATHAM TO S.C. STATE LINE ... SEE CHATHAM
PE 1994 . $
0
51116X UNKNOWN/ UNKNOWN
CONG DIST. 1
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
0
MANAGER: UNKNOWN
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
511160 IS AN ASSOCIATED PROJECT.
0TH SHARE$
EFFINGHA I-16 WIDEN 10 BRIDGES@ MP 138.3; 145.9;- 146.6; 147.2/BRYAN 51119X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
EFFINGHA NEW PARALLEL BR/SR 21@ LITTLE EBENEZER CRK 521705 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS
CONG DIST. 1 GRIP.PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521700 IS AN ASSOCIATED PROJECT.
PE 1990 UNDERWAY
ROW NONE
$
0
CONST 1994
$
170
FED SHARE $ 136
GA. SHARE $.
34
0TH SHARE $
EFFINGHA SR 17&26/US 80 FM SR 17 TO CHERRY ST IN BLOOMINGDALE/O~:ATHAM 522170 RECONSTRUCTION & WIDENIN.G FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .79 MANAGER: M. REYNOLDS (M)
SAVANNAH TIP f 87 H3 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 896 AFTER 96
EFFINGHA CR 307@ EBENEZER CREEK NW OF CR 72
532390 BRIDGES/ REPLACEMENT PROJECT MILEAGE: .11 MANAGER: PETE BLOCKER
CONG DIST. 1 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 126
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
E-L-B-E-R-T-----CO--U-N-TY---O-P-E-R-A-TED P-U--B-L-IC---T-R-A-N-S-IT
SER--V-IC-E----------------------
------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
1Bl008 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 10
FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994
$
81
FED SHARE$
47
GA. SHARE$
0TH SHARE$
33
ELBERT 181009
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1995 $
82
FUND S.OURCE: RURAL TRANSIT
FED SHARE$
48
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
34
ELBERT 181010
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1996 $
87
FUND SOURCE: RURAL TRANSIT
FED SHARE$
51
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
36
ELBERT 1C2008
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT f:1ANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1994
.$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
ELBERT 1C2009
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED .. SHARE $
17
(.
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
ELBERT 1C2010
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1996
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
ELBERT 170990
CR 168/GOSS ROAD@ SOUTH BEAVERDAM CREEK NW OF ELBERTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER:
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
8
ROW LOCL
CONST 1996. $ 282
FED SHARE$ 225
GA. SHARE$
56
0TH SH~$
~ .,,
.j,
,1
,f ~
~
~
~
~~ti
' ~ -.
~
~
~~j!
~~;~!ii
~~~ill!
~
.'" '\al,
,~:'!'..:.J;.'.i
,;)
}!::::.-,'.!;~
~
f:~~-;..~~i
~:::: .i~
.,. ~~!'
!" '.......~.
4,,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 127
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ELBERT CR 183/C'WATER-PLANTATION@ GUM LOG BRANCH N OF ELBERTON
PE 1994
$
5
170991 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
CONG DIST, 10
ROW LOCL
PROJECT MILEAGE : ,19
CONST 1996
$
173
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
138
. FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
35
0TH SHARE$
,.-,
(
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 128
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EMANUEL COUNTY OPERATED PUBLIC TRANSIT SERVICE
2Bll08 TRANSIT FACILITIES/ OPERATIONS
CONG ors,;. 1
FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
(
FUND SOURCE: RURAL TRANSIT
OPERATING 1994 $
31
FED SHARE$
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
13
EMANUEL 2Bll09
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
CONG DIST. 1
OPERATING 1995 $
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
19
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE$
14
EMANUEL 2Blll0
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
CONG DIST. 1
OPERATING 1996 $
34
FUND SOURCE: RURAL TRANSIT
FED SHARE$
20
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
EMANUEL 2C2108
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
CONG DIST. l
FUND SOURCE: RURAL TRANSIT
CAPITAL 1994
$
32
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
EMANUEL 2C2109
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
CONG DIST. l
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
EMANUEL 221300
SR 56@ N/S PRONG CANOOCHEE & OFLW;MCKINNEY BR;OGEECHEE OFLW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,80 MANAGER: D. GRIFFITH
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1994 $ 2285
FED SHARE $ 1828 GA. SHARE $ 457
0TH SHARE $
EMANUEL 222210
SR 26/SWAINSBORO@ SOUTHERN RR/REMOVE BR & CONST GRADE XING
BRIDGE REMOVAL/ NEW CONSTRUCTION PROJECT MILEAGE : .30 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GRIFFITH
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1995 CONST .
UNDERWAY
$
23
AFTER 96
i,.
,, ,.-,
'. ,,.,.
~
.-,~ . ~
~ ~
~
~
~
~JfL~
f,tW;,m
h.,:,n ~~
(
I
f-"';#.":l\ll
w~c':;':
f;~,......'{
~
~...
'(~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATI9N IMPROVEMENTS PROGRAM
Page 129
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O-.----------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EMANUEL SR 46@ JACKS CREEK l MILE WEST OF CANDLER CO LINE
PE 1993 UNDERWAY
231130 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 1
ROW 1994
$
1
PROJECT MILEAGE : .30
CONST 1995
$
878
MANAGER: D. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
702
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
176
0TH SHARE$
EMANUEL 231380
SR 57/KITE RD@ MCLEOD BRIDGE RD/GOLF RD/ROBIN RD
INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .36 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH
CONG DIST. 1
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1994
$
9
CONST 1994
$
267
FED SHARE$ 240
GA. SHARE$
27
0TH SHARE$
EMANUEL 250460
OLD NUNEZ RD/CR 461 FM MEADOWLAKE PKWY/CR 365 TO SR 56/57 MINOR WIDEN & RESURF / RECST. OR REHAB. PROJECT MILEAGE : .95 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: D. GRIFFITH
CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$
658
FED SHARE$
526
GA. SHARE$
132
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 130
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
----------------------------------------
----------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EVANS SR 73/US 301 FM TATTNALL CO LINE TO S CL/CLAXTON
PE 1993
UNDERWAY
522005 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 1
ROW 1995
$
200
PROJECT MILEAGE : 6.75
,
CONST
AFTER 96
MANAGER: PETE BLOCKER
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY AOMIN FUNDS
4
I 4
. '.
.,
Jm!ll!l!!I!
. ,, ~
~~
~ .
~
~
!i!~U~
~,i}'t!~
MJ
1~>. :~:~ ~ *
'tji;~:,;,':1
~~::~:-;-::~-;
i::~;~~1
:-: -. ::.:
~
..
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 131
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------------------------------------------------------- ---------------------------------------------------------------
FANNIN COUNTY OPERATED PUBLIC TRANSIT SERVICE
6B1348 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: FANNIN
OPERATING 1994
$
76
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
44
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
32
FANNIN 6Bl349
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
79
FUND SOURCE: RURAL TRANSIT
FED SHARE$
46
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
33
FANNIN 6Bl350
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1996 $
82
FUND SOURCE: RURAL TRANSIT
FED SHARE$
48
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
34
FANNIN 6C2348
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1994
$
31
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
FANNIN 621340
SR 5 FM SR 2/BLUE RIDGE N TO PROP MCCAYSVILLE BYP- NR CR 138 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 7.80 MANAGER: J. GRAYBEAL (M)
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FANNIN 630875
SR 60@ HEMPTOWN CRK/MINERAL BLUFF; @ YOUNG STONE CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .36 MANAGER: BILL MCVEY
FANNIN 63Y875
(_
PROJECT SHOWN FOR "STP" FUNDS ONLY ... SEE 630875 UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 63Y875 IS AN ASSOCIATED PROJECT.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630875 IS AN ASSOCIATED PROJECT.
PE 1988 UNDERWAY
ROW 1989 UNDERWAY
CONST 1994
$
611
FED SHARE $
489
GA. SHARE $
122
0TH SHARE $
PE 1988 UNDERWAY
ROW NONE
$
0
CONST 1994
$
209
FED SHARE $
167
GA. SHARE $
42
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 132
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P, I.NO.
PROJECT DATA
--------- - --- FANNIN SR 515 FM CR 300 (PICKENS) TO UNION CL .... PICKENS/GILMER
------C-O-M--M-E-N-T-S ---------------------------Y-EA--R --------E-S-T-S --
PE NONE $
0
67080Z
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 9
PROJECT MILEAGE : 48.26 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
ROW 1994
$
CONST 1994 $
FED SHARE$
0 0
FEDERAL HIGHWAY. ADMIN FUNDS
GA. SHARE$
670800 IS AN ASSOCIATED PROJECT.
0TH SHARE$
FANNIN 670930
RESTORE MINERAL BLUFF DEPOT MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE $
0
CONST 1996 $ 128
FED SHARE$
102
GA. SHARE$
0TH SHARE$
26
l
C,0
'.
~
~
. ~
~
. ~
~
~Xil~
~ft~,~~
f);.(:.~11
t::v,;._i::~
\!(.:~--~::~
~
r.:e.~:~ :~
~
~,:~1::f
I\.'.
I~
~~ .
!t.&-..:--:,:-~'.~
f ..
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 133
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-------------------------------------------------------------! -------------------------------------------------------------------
FAYETTE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
.
3Vl022 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 3
FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY
CAPITAL 1994
$
10
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
FAYETTE 3V1023
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH.
CONG DIST. 3
CAPITAL 1995
$
10
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
FAYETTE 3Vl024
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH
CONG DIST. 3
CAPITAL 1996
$
10
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
FAYETTE 321950
SR 92 S/FAYETTEVILLE FM MCBRIDE RD/INMAN TO J MAYFIELD DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3,38 MANAGER: M. REYNOLDS (M)
ATLANTA TIP t FY 3
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 2313 AFTER 96
FAYETTE 321960
SR 85 $/FAYETTEVILLE FM $/BERNHARD RD TO OLD SR 92/F'VILLE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.58 MANAGER: M. REYNOLDS (M)
ATLANTA TIP t FY 6
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FAYETTE 321964
SR 85 FM SR 74 N TO BERNHARD RD/CR 126 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.30 MANAGER: M. REYNOLDS(CM)
ATLANTA TIP t FY 5
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FAYETTE 321966
SR 85@ WHITEWATER CREEK REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS (M)
ATLANTA TIP t FY 13
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1996
$
136
FED SHARE $
109
GA. SHARE $
27
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 134
PROJECT LISTING BY COUNTY .FY 1994/FY 1996
COUNTY
DESCRIP_TION
FISCAL
COST
P.I.NO.
PROJECT DATA
F-A-Y--E-T-TE----SR---5-4-@---S-C-L--RR
------
------
-----------A--T-L-A-N-TC-AO-M.-T-MI-PE-N-fT-S-FY---1-2---------------------P-EY-E-A1-R9-9-2-----U-EN-DS-TER-SW--AY
322065 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 3
ROW NONE
$
0
PROJECT MILEAGE : .01
CONST 1996
$
663
MANAGER: M. REYNOLDS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 530
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 133
0TH SHARE $
FAYETTE 32206X
SR 34/54 FM FISCHER CROSS RDS TO SR 74 ... SEE COWETA CO UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: M. REYNOLDS
r_-
FAYETTE 32206Y
SR 54@ LINE CREEK/SEE COWETA CO UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M. REYNOLDS
coNG oisT. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 322060 IS AN ASSOCIATED PROJECT.
CONG DIST. 3
FUND "SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322063 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1995 CONST
UNDERWAY
$
0
AFTER 96
PE NONE $
0
ROW NONE $
0
CONST 1996 $-
0
FED SHARE$
GA. SHARE$
0TH SHARE$
FAYETTE 322350
SR 74 FM CROSSTOWN RD/TDK BLVD NW TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 2:15 MANAGER: M. REYNOLDS
ATLANTA TIP f FY 9 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT . . FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FAYETTE 322355
SR 74 FM SR 85 NW TO CROSSTOWN RD/TDK BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.91
MANAGER: M. REYNOLDS (M)
ATLANTA TIP f FY 9 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AFTER 96 AFTER 96
FAYETTE 322357
SR 74@ FLAT CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .25 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f FY 15 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW NONE CONST
$
10
$
,o
AFTER 96
FAYETTE 322358
SR 74 BICYCLE BRIDGE OVER SR 74 IN PEACHTREE CITY
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: N. PASSMORE (C)
ATLANTA TIP t FY 14
CONG DIST. 3
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
754
FED SHARE$
603
GA. SHARE$
48
0TH SHARE$ 103
.
~
E:LL....,
~
~
,f
12L-.J
e_l
f,.JLi
P.tU.'.~
~1~
~--L,
t~}.,'!'l,J
r.. .,_.,.,i
1'r.~~'.~1~
~
::-:-:.....;,
i.'.::-:~-~~
r.~
~
!'.""'""''""~:
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 135
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FAYETTE SR 74 AT PASCHALL ROAD IN PEACHTREE CITY
ATLANTA TIP f FY 9
PE 1994
UNDERWAY
322650 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 3
ROW 1994 $
10
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
CONST 1994 $ 231
MANAGER:
FUND SOURCE: HWY. SAFETY
FED SHARE$ 208
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
23
0TH SHARE$
FAYETTE 322660
SR 85 AT HOOD AVENUE NORTH OF FAYETTEVILLE SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER:
ATLANTA TIP f FY 18 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 347
FED SHARE$
312
GA. SHARE$
35
0TH SHARE$
FAYETTE SR 74 AT CRABAPPLE/PEACHTREE, TYRONE AND JENKINS ROADS 322670 . ACCELERATION/DECELERATION LN / TRAFFIC
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER:
ATLANTA TIP f FY 19 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1995 $ 173
FED SHARE$ 156
GA. SHARE$
17
0TH SHARE$
FAYETTE 331930
SR 85 CONN FM CR 168 TO SR 85; PPL FM 4.0 TO 6.0 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.I,
PROJECT MILEAGE : 3.90 MANAGER: K FULBRIGHT (M)
ATLANTA TIP f FY 1 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1995 CONST
UNDERWAY $ 2950 AFTER 96
FAYETTE 342800
SR 85 CONN FM SR 16 IN SPALDING CTY N TO CR 168 IN BROOKS RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 3.34
MANAGER: GORDON BROWN(M)
ATLANTA TIP f FY 17
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 . ROW
CONST
$
70
AFTER 96
AFTER 96
FAYETTE 37091X
CR 157@ LINE CRK & OFLW .. SEE COWETA CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: UNKNOWN
FAYETTE 370920
CR 275/SHERWOOD RD@ WHITEWATER CREEK REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
370910 rs AN ASSOCIATED PROJECT.
ATLANTA TIP f FY 11 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1994 $ 341
FED SHARE$ 273
GA. SHARE$
68
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993. Page 136
COUNTY
DESCRIPTION
FISCAL
COST
P .I.NO.
PROJECT DATA
--------------------------------------
----
-------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FAYETTE SR 54@ MORNING & CAMP CRKS; FLINT RIVER/SEE CLAYTON CO
ATLANTA TIP f CL23/FY2
PE 1986 UNDERWAY
72104X REPLACEMENT OF THE EXISTING BRIDGES{S), NO ADDED LANES,
CONG DIST. 3
.
ROW 1994
$
0
PROJECT MILEAGE : ,00
CONST 1995
$
0
MANAGER: M; REYNOLDS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
FEDERAL HIGHWAY ADMIN FUNDS 721040 IS AN ASSOCIATED PROJECT,
GA; SHARE $ 0TH SHARE $
FAYETTE 72129X
SR 85 FM SR 279/FAYETTE TO ROBERTS DR/CLAYTON
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: K FULBRIGHT
ATLANTA TIP f CL15/FY4
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721290 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1996 CONST
UNDERWAY
$
0
AFTER 96
FAYETTE 72129Y
SR 85 NBL@ CAMP CREEK/SEE CLAYTON COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .OO, - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: K FULBRIGHT
ATLANTA TIP f CL 77 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
721295 IS AN ASSOCIATED PROJECT.
PE 1992 ROW NONE CONST
,UNDERWAY
$ .
0
AFTER 96
FAYETTE 721440
SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 & CLAYTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.53 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f CL41/FY10 CONG DIST. 3 .
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 72144X IS AN ASSOCIATED PROJECT.
PE 1996 ROW CONST
.$
144
AFTER 96
AFTER 96
FAYETTE 75185X
SR 314 FM SR 279 TO NORMAN DR/CLAYTON . SEE CLAYTON CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M GANNAWAY
ATLANTA TIP f CL5/FY8 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 751850 IS AN ASSOCIATED PROJECT.
PE 1996 ROW CONST
$
0
AFTER 96
AFTER 96
.
~
~
28 ~
~
l!-.'LL.1!
~!,
~UJ:-:~!C
t\.,l,,_.:'!l
!~l,r'J
,, ~
P,fj!itJ~
tt:.:~;re
t'fr~!.{tru
t>,.;;,
~
.. i.'. .:(;; I-'..,,:,'{, ..,,
, ..I~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 137
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FLOYD TRUCK, RADIOS, SECURITY CAMERAS, CAP. MAINT., SHELTERS, ETC
6D6010 TRANSIT PROJECTS / CAPITAL
1.
CONG DIST. 7
FUNDS RECIPIENT: ROME TRANSIT SYSTEM
CAPITAL 1994
$ 1072
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
B5B
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
107
0TH SHARE$
107
FLOYD 6D601l
5 TRANSIT BUSES, VAN, CAR, CAP. MAINT., SHELTERS, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1995
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
1116 B93 112 112
FLOYD 606012
5 TRANSIT COACHES, TOW TRUCK, CAP. MAINT., SHELTERS, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
1149 919 115 115
FLOYD 6D6013
PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994
$ ' 1330
FED SHARE $- 665
GA. SHARE $.
0TH SHARE $: 665
FLOYD 6D6014
PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
1184 213
213 11B4
FLOYD 6D6015
PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSiT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
1254 213 213
1254
FLOYD 6Vl010
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1994
$
23
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
2
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 138
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
F-L-O-Y-D-----E-L-D-E-R-L-Y--A-N-D--D--IS-A-B-L-E-D--V--E-H-IC--L-E-S--AND
E-Q-U--IP-M-E-N-T------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
6Vl011 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 7
FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA MANAGER: STEVE KISH
CAPITAL 1995
$
24
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
19
FEDERAL TRANSIT.ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
2
FLOYD 6V1012
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES.IN FLOYD MPO AREA MANAGER: STEVE KISH
CONG DIST. 7
l
CAPITAL 1996
$
25
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
20
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
FLOYD 610980
DECK OVERLAYS FOR 115-0006, 115-0007, 123-0024, 129-0066
BRIDGES/ RECST. OR REHAB.
.
PROJECT MILEAGE : .00
MANAGER: L. SEABROOK
FLOYD 620590
SR 1/US 27 IN ROME FM 5TH AVE TO JOHN DAVENPORT DR RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .20 MANAGER: H. ASHMORE
CONG DIST. 9 & 7
FUND SOURCE: I-STATE M!\,INT. FEDERAL HIGHWAY ADMIN FUNDS 61Y980 IS AN ASSOCIATED PROJECT.
ROME TIP I L-85-11
'
CONG DIST. 7
GRIP PROJECT
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 3135 2822 314
PE 1994 $ ROW 1995 $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
36 50 1215 972 243
FLOYD 620900
SR 101/S OF ROME OVER SR 20 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .30 MANAGER: RON BRAZIEL (M)
ROME TIP f S-86-24 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1985 ROW LOCL CONST
UNDERWAY AFTER 96
FLOYD 621075
US 27@ ARMUCHEE & LITTLE ARMUCHEE CRKS/CHATTOOGA CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .06 MANAGER: RAY METTS
FLOYD 621450
W ROME BP FM CR 638 TO CR 268/INCL BR@ COOSA RVR CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 1.10 MANAGER: M GANNAWAY
ROME TIP I L-89-8
CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621070 IS AN ASSOCIATED PROJECT.
ROME TIP .I L-89-10 CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1994 $ 725
FED SHARE $ 580
GA. SHARE $
145
0TH SHARE $
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$ 3952
FED SHARE $ 3162
GA. SHARE $
790
0TH SHARE $
,, "'
.
'
IH?-!dm
~
~ ~Lill! '
~
f!i'j!2!=~
~
1;;1~=
1'11'.~1~
~
~-~I\OC;<&
/i?'/,\';1~
~:i'&
r,t:~~-~~~
t~d.--:>:-~
,. ., . ,. . . ~~
~
j,:.-'>-,;--;
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION-IMPROVEMENTS PROGRAM
Page 139
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I--.N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FLOYD SR 20/100 FM SR 100 NORTH TO SR 100 SOUTH@ COOSA/INCL CLVT
PE 1992 UNDERWAY
621550 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 7
ROW
AFTER 96
PROJECT MILEAGE : 2.95
CONST
AFTER 96
MANAGER: BILL MCVEY (M)
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY AOMIN FUNDS
FLOYD 621560
SR 53 FM MP 0.54 TO 14.15 [ WON 20 CLVTS) BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 14.89 MANAGER: BILL MCVEY (M)
FLOYD 621690
SR 101 FM CR 740/CS 899 NORTH TOE 12TH ST/ROME RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.84 MANAGER: RON BRAZIEL (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
44
AFTER 96
ROME TIP I S-92-25
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1994 ROW 1996 CONST
$
134
$ 1150
AFTER 96
FLOYD 621700
SR 20/NEW ROUTE/ATLANTA TO MEMPHIS HIGHWAY ... & BARTOW CO PRELIMINARY ENGINEERING/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: N PASSMORE (M)
ROME TIP f 621700 CONG DIST. 7
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE 1993 ROW NONE CONST NONE
UNDERWAY
$
0
$
0
FLOYD 631350
SR 53 AT SR 140
c
INTERSECTION IMPROVEMENT/ TRAFFIC
.
PROJECT MILEAGE : .02 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: BILL MCVEY
FLOYD 650410
DIVISION ST/ROME FM SHORTER AVE TO REDMOND RO/& REMOVE RR BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.04 MANAGER: RON BRAZIEL
FLOYD 650460
SR 101 OVER ETOWAH RIVER IN ROME REHAB. OF THE EXISTING BRIOGE(S). FRO~ 4 LANES TO 5 LANES.
PROJECT MILEAGE : .37 MANAGER: D. SMITH
ROME TIP I S-93-1
CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
ROME TIP f L-85-12 CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
ROME TIP f L-89-4 CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0
o
165 149
17
PE 1993 UNDERWAY
ROW LOCL
CONST 1994 $ 1619
FED SHARE$ 1295
GA. SHARE$
324
0TH SHARE$
PE 1993 UNDERWAY
ROW 1996 $ 405
CONST
l AFTER 96
GEORGIA DEPARTMEL:T OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 140
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FLOYD CR 641 OVER POCKET/JOHN'S CK/S POCKET CAMPGROUND
PE 1993 UNDERWAY
670760 BRIDGES/ REPLACEMENT
CONG DIST. 7
ROW NONE $
0
PROJECT MILEAGE : .00
CONST 1994
$
220
MANAGER: BILL MCVEY
FUND SOURCE: FED. LANDS
FED SHARE$ 220
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
FLOYD 670770
CR 641 OVER JOHNS/POCKET CREEK
BRIDGES/ REPLACEMENT PROJECT MILEAGE : ,15 MANAGER: BILL MCVEY
FLOYD 670820
MAYO'S BAR LOCK AND DAM RESTORATION ON COOSA RIVER MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: MEG BRYSON
CONG DIST. 7
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
ROME TIP I 670820
CONG DIST. 7
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW LOCL
CONST 1994 $ 277 FED SHARE$ 277 GA. SHARE$
0TH SHARE$
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
1450
1160 710
1000
FLOYD 670830
CLASS I BIKEWAY IN ROME BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00. - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: MEG BRYSON
ROME TIP I 670830
CONG DIST. 7
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996 $ 465
FED SHARE$ 372
GA. SHARE$
0TH SHARE$
93
FLOYD 670880
BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT 16
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
.FED SHARE$
GA. SHARE$ 0TH SHARE$
0 0 1019 815 204
,, ,,,
.
~
~ ~ fll,.,_!'!!.!Ll
...
P..L,Ji!,!
~l.)fJl
~
L,.'.':;.,
~),"""-~'1
/,.(.._ ..,,
I
fE!. .;,;~
1,,-.:~,~
11.,l":.:1;_,
/~tt':~{t:f'/
j , ........... :--:
. '
f I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 14_1
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
-------------------------- --------------------------------------------------------------------------------------------------------
FORSYTH COUNTY OPERATED PUBLIC TRANSIT SERVICE
1Bl013 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 9
FUNDS RECIPIENT: FORSYTH
OPERATING 1994
$
51
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
30
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
21
FORSYTH 1B1014
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
53
r.
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
31
GA. SHARE$
0TH SHARE$
22
FORSYTH 1B1015
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1996 $
56
FUND SOURCE: RURAL TRANSIT
FED SHARE$
33
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
23
FORSYTH 1C2013
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1994
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
FORSYTH 1C2014
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL-1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
FORSYTH 121690
SR 9 SOUTH OF CUMMING FM SR 141 N TO SR 20 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.80 MANAGER: H. ASHMORE(M)
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AFTER 96
AFTER 96
FORSYTH 121910
RW ON 162010,162014,162018 . FM SR 371 TO ALCOVY RD RIGHTS-OF-WAY/ NEW CONSTRUCTION PROJECT MILEAGE : 25.60 - EXIST. LANES: 0 /PROPOSED LANES: 4 MANAGER: NEIL DAVIS
ATLANTA TIP f R 54 CONG DIST. 9 GRIP PROJECT FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PE NONE ROW 1989 CONST NONE
$
0
UNDERWAY
$
0
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 142
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P. I.NO.
PROJECT DATA
---- ---------- -
---
--
FORSYTH SR 141 FM 0,6 MI NORTH OF FULTON CO LINE TO SR 9
121980 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.21
MANAGER: H. ASHMORE(M)
FISCAL
COST
-------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PE 1992 UNDERWAY
CONG DIST. 9
ROW
AFTER 96
CONST
.AFTER 96
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
FORSYTH 122015
SR 306/369 FM SR 400 TO HALL CO LINE/INCL BR@ FOUR MILE CRK RECONSTRUCTION &- WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 9.09 MANAGER: H. ASHMORE(M)
FORSYTH sR 369@ SIX MILE & @ TWO MILE CREEKS 122017 REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .SO MANAGER: H. ASHMORE(M)
FORSYTH SR 20 FM SR 400 TO SAMPLE ROAD/CR 80 122250 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.02
MANAGER: H. ASHMORE(M)
(_
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 122012 IS AN ASSOCIATED PROJECT,
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 122015 IS AN ASSOCIATED PROJECT,
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FORSYTH 122540
SR 400 INSTALL LOGO SIGN PANELS IN FORSYTH COUNTY
SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FORSYTH 122550
SR 9 AT SR 20 SOUTH OF CUMMING INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FORSYTH 132390
SR 306 AT SR 369 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .53 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS_
CONG DIST. 9 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST,. 9 FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
21
FED SHARE$
17
GA. SHARE$
4
0TH SHARE$
PE NONE $ ROW 1995 $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
o
1 173 156
17
PE 1994 UNDERWAY
ROW 1994
$
4
CONST 1995 $ 310
FED SHARE$ 279
GA. SHARE$
31
0TH SHARE$
,, ,.
..,
~
. ~ ~ ,, ~~
[G~C~
,=;,= -za.=,
[,:,X:\\i
~/!'{J
121,:.}~1
~
'
f!!'i'~J
~'TifJi
it*-!i!!!i
,::!:;:~:
I'::.:. .......-.,
~-:--"-
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 143
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FORSYTH SR 20/SR 9/CUMMING@ CS 526; & CR 87
PE NONE $
0
141605 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 9
ROW 1994 $
50
PROJECT MILEAGE : .10 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST 1994 $ 250
MANAGER: L. OWENS
FUND SOURCE: HWY. SAFETY
FED SHARE$ 225
FEDERAL HIGHWAY AOMIN FUNDS
GA. SHARE$
25
0TH SHARE$
FORSYTH 141770
SR 9@ SR 306/CHARLES PLACE IN CUMMING INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .15 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: L. OWENS
CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 150 135 15
FORSYTH 171010
BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT fl
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
(.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE NONE $ ROW NONE $
CONST 1994 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0 1245
996 249
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 144
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-----------------------------------------------------------------------------------------------------------------------------------
FRANKLIN I-85 SIGN MOD FM DEK CL TO SC STATE LN .. GWIN/JACKS/BARR/BANK
PE NONE $
0
11044W SIGNING/ MAINTENANCE
CONG DIST. 10 & 6
ROW NONE $
0
PROJECT MILEAGE : 76.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
110440 IS AN ASSOCIATED PROJECT.
0TH SHARE$
FRANKLIN I-85 UPGRADE NB REST AREA f 81
110460 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER:
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
39 0
1310 1179
131
FRANKLIN SR 17(@I-85 RECST INTERCHANGE-IM]FM NCL LAVONIA-STEPHENS CL 12Y080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .00
MANAGER: UNKNOWN
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 122080 IS AN ASSOCIATED PROJECT.
PE 1994
$
0
ROW 1995 $
0
CONST 1996 $ 500
FED SHARE$ 450
GA. SHARE$
50
0TH SHARE$
FRANKLIN SR 106 AT SR 51 141760 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : .30 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS
CONG DIST. 10
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1993 UNDERWAY
CONST 1994 $ 333
FED SHARE$ 300
GA. SHARE$
33
0TH SHARE$
FRANKLIN OVERLAYS FOR 013-0013,089,0089,119-0002,119-0040,139-0004
811045 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: UNKNOWN
CONG DIST. 10 & 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 81Y045 IS AN ASSOCIATED PROJECT.
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 1108 997 111
FRANKLIN OVERLAYS FOR SIX BRIDGES IN DIST 1,7; TO SHOW STP FUNDS 81Y045 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: UNKNOWN
I_
PE NONE $
0
CONG DIST. 10 & 4
ROW NONE $
0
CONST 1994 $ 300
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 240
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
60
811045 IS AN ASSOCIATED PROJECT.
0TH SHARE$
. ,, '
..
~
~ !i~:~ ~-~~~i e_~;Jffi ~ ~ ~ ; ~~r,;::~ r,.:n;,i.,~ 1:01';:,~ w-x,r,r.~ ~ f;< ..,.:, I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
Page 145
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
FULTON TRANSIT TRAVELER DEMONSTRATION PROJECT
FISCAL
COST
------------------------.-C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
7D7010 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 5 & 4
FUNDS RECIPIENT: CITY OF ATLANTA
CAPITAL 1994
$ 1875
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$ 1500
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
375
FULTON 707011
NORTH RAIL LINE EXTENSION - MEDICAL CTR TO NORTH SPRINGS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1994
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE.$
50332 40266
10066
FULTON 7D7012
FIXED GUIDEWAY MODERNIZATION PROGRAM TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1994
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
8494 6795
1699
FULTON 707013
PROCURE 100 BUSES AND BUS RELATED FACILITIES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1994
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
26000 20800
5200
FULTON 707015
NORTH LINE EXTENSION - MEDICAL CENTER TO NORTH SPRINGS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1995
$
FUND SOURCE: URBAN TRANSIT DISC,
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
64264 51411
12853
FULTON 7D7016
FIXED GUIDEWAY MODERNIZATION PROGRAM TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1995
$
FUND SOURCE: URBAN TRANSIT DISC,
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
8494 6795
1699
FULTON 707017
PROCUREMENT OF 80 BUSES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1995
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
17600 14080
3520
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 146
- COUNTY
P.I.NO.
F-U-L-T-ON
NORTH
LINE
DESCRIPTION PROJECT DATA
- EXTENSION - MEDICAL
CENTER
TO
NOR-T-H-
FISCAL
COST
SPRINGS-------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
7D7019 TRANSIT PROJECTS/ CAPITAL
CONG DIST, 5 & 4
FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CAPITAL 1996
$ 22564
~UNO -SOURCE: URBAN TRANSIT DISC.
FED SHARE$ 18051
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$ 4513
FULTON 7D7101
FIXED GUIDEWAY MODERNIZATION PROGRAM TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIS_T. 5 & 4
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA, SHARE$
0TH SHARE$
8494 6795
1699
FULTON 7D7121
PUBLIC TRANSIT SERVICE FOR FULTON AND DEKALB COUNTIES TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
11232 5616
5616
FULTON 7D7132
CAP. MAINT., RAIL CAA- OVERHAUL, BUS PURCHASES, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT:- MARTA MANAGER: STEVE KISH
CONG DIST; 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1994
$
FED SHARE$
GA, SHARE$
0TH SHARE$
30570 24456
6114
FULTON 7D7143
PUBLIC TRANSIT SERVICE FOR FULTON AND DEKALB COUNTIES TRANSIT PROJECTS/ -OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DiST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
10344 5172
5172
FULTON 7D7154
LINE REHAB. /RENOV., RAIL CAA OVERHALL, CAP_. MAI NT., ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
29976 23981
5995
FULTON 7D7165
PUBLIC TRANSIT SERVICE FOR FULTON AND DEKALB COUNTIES TRANSIT.PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
10344 5172
5172
,, .
,. I
~-.
~~
~
=cn.,.-,;.::;;.,":J
= =
e:t~g~ = ~[I!
~~.~':-~;.; 11i.!/:l;t'~ ~,:.'[ft;~ ~.::.1:i,:7:!i ~ ~ ,~i.;;!!f?;~ i,,,~-,,,,,
. '
I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep~l993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 147
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
------ ---------------- - -------
------------------- (-----------------C-O-M-M--EN-T-S---------------------------Y-E-A-R---------E-S-T-S--
FULTON RAIL CAR OVERHAUL, BUS PURCHASES, CAP. MAINT., ETC.
707176 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 5 & 4
FUNDS RECIPIENT: MARTA
CAPITAL 1996
$ 29976
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
FED SHARE$ 23981
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$ 5995
FULTON 707501
REGIONAL, FINANCIAL AND SHORT RANGE PLANNING SPECIAL STUDIES/ PLANNING FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PLANNING 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
1600 1280
320
FULTON 707502
REGIONAL, FINANCIAL AND SHORT RANGE PLANNING
SPECIAL STUDIES/ PLANNING FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PLANNING 1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
1600 1280
320
FULTON 707503
REGIONAL, FINANCIAL AND SHORT RANGE PLANNING SPECIAL STUDIES/ PLANNING FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PLANNING 1996
$
FED SHARE$
GA. SHARE $
0TH SHARE$
1600 1280
320
FULTON 7Vl025
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY
MANAGER: STEVE KISH .
CONG DIST. 5
CAPITAL 1994
$ 127
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 102
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
12
0TH SHARE$
13
FULTON 7Vl026
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL
.
FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY
MANAGER: STEVE KISH
CONG DIST. 5
CAPITAL 1995
$ 131
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
105
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
13
0TH SHARE$
13
FULTON 7V1027
.ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY
MANAGER: STEVE KISH
CONG DIST. 5
CAPITAL 1996
$ 136
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 109
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
13
0TH SHARE$
14
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 148
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-FULTON
31171Z
CALL BOXES ON I-85 UNKNOWN/ UNKNOWN
FM
ALABAMA
TO
SR
- 74/FULTON ... SEE
HA-R-R-IS------------------------------------------------P-E--1-9-9-4-----$------0
CONG I;>IST. 1 & 3
ROW NONE $
0
PROJECT MILEAGE: .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
CONST 1996 $
0
MANAGER:
FUND SOU~CE: I-STATE HAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
FULTON 320H94
LUMP SUM FOR HOV CONGESTION MITIGATION WORK
MISCELLANEOUS IMPROVEMENTS/ TRAFFIC
1.
PROJECT MILEAGE ,OO - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP t R 174
CONG DIST: 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADHIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0
10000 8000 2000
FULTON 712360
I-285@ WASHINGTON RD/INCL WON WASHINGTO RO 600' W OF BR INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .51 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: BILL MOSKAL
ATLANTA TIP t FS 17
CONG DIST. 5
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1988 UNDERWAY ROW 1991 UNDERWAY CONST 1996 $ 1651
FED SHARE $ 1486 GA. SHARE $ 165 0TH SHARE $
FULTON 712850
I-85 STAGE 2 PAVING FM I-75 TO I-285/ALSO DEKALB
ATLANTA TIP t R 109
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 4 & 5
PROJECT MILEAGE: 10.90 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FUND SOURCE: I-STATE CONST.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
4233 3810
423
FULTON 712920
I-20: FROM I-285 EAST TO WINDSOR ST
LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 6.34 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E. LAWS
ATLANTA TIP t R 124
CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1994 $ 2000
FED SHARE $ 1600
GA. SHARE $ 400
0TH SHARE $
FULTON 712940
I-75@ HT PARAN ROAD INTERCHANGE/ TRAFFIC PROJECT MILEAGE : .30 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS
ATLANTA TIP t R 105
CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 2200
FED SHARE $ 1760
GA. SHARE $
440
0TH SHARE $
FULTON 712950
I-85@ MONROE DRIVE INTERCHANGE/ TRAFFIC PROJECT MILEAGE : .30 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS
ATLANTA TIP .t R 106 CONG DIST. 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1995 $
50
CONST 1996
$ 2200
FED SHARE $ 1760
GA. SHARE $ 440
0TH SHARE $
. . ,,
I..
,.. ,. '
=== mrn~~ . ~ ~ ~ =~ =~ B!I)~
~
~.,.~:~ti! h~~~ ~:if,:';;~ f.\:!iC;f.' ~~ii r::~:,--:,_,~
.. .,.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 149
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON I-BS SB, REPLACE IMPACT ATTENTUATOR
ATLANTA TIP f R 140
PE 1993 UNDERWAY
712960 IMPACT ATTENTUATORS / TRAFFIC
CONG DIST. 5 & 4
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4
CONST 1994 $
35
MANAGER: BURT RIDDLE
FUND SOURCE: I-STATE MAINT.
FED SHARE$
35
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
FULTON 712965
I-20 WB & I-85 SB REPLACE IMPACT ATTENUATORS IMPACT ATTENTUATORS / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: BURT RIDDLE
(
ATLANTA TIP f R 140 CONG DIST. 5 & 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1994
$
155
FED SHARE$
155
GA. SHARE $
0TH SHARE$
FULTON 71297Z
HOV LN SIGNING ON I-75 & I-BS METRO/CLAYTON;COBB;GWINNETT HOV LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
ATLANTA TIP f R 73
PE 1994
$
0
CONG DIST. 5
ROW NONE $
0
CONST 1995 $
0
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
712970 IS AN ASSOCIATED PROJECT.
0TH SHARE$
FULTON 7129BO
I-20 FM BOULEVARD EAST TO I-2B5 INCL I-2B5 INTERCHANGE LANDSCAPING/ MAINTENANCE PROJECT MILEAGE : 8.93 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BEN BUCHAN
ATLANTA TIP f DK-R 137 CONG DIST. 4 & 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 3000
FED SHARE$ 2400
GA. SHARE$ 600
0TH SHARE$
FULTON 713010
I-20 PAVEMENT MARKINGS FRM MP 50.6 TO 55.9 PVMNT MARKINGS/ TRAFFIC PROJECT MILEAGE : 5.30 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP f AT-R 155 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
67
FED SHARE$
67
GA. SHARE$
0TH SHARE$
FULTON 71302X
I-20 FM W OF SIX FLAGS DR TOW OF SR 2BO/SEE COBB
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP f AT-R 154
PE NONE $
0
CONG DIST. 5
ROW NONE $
0
CONST 1994
$
0
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
713020 IS AN ASSOCIATED PROJECT.
0TH _SHARE $
FULTON 7130B5
I-20 WB 61 SIGNS FROM I-75 TO COBB COUNTY LINE
SIGNING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
ATLANTA TIP f R 130 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
363
FED SHARE$
363
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 150
COUNTY
DESCRIPTION
P. I.NO.
PROJECT DATA
--------- --- - FULTON I-285 WESTSIDE . 52 SIGNS, NB FROM I-20 TO I-75 .. COBB
713095 SIGNING/ MAINTENANCE
PROJECT MILEAGE : .00 - EXIST: LANES: 0 /PROPOSED LANES: 0
MANAGER:. BURT RIDDLE
FISCAL
COST
----A-T-L-A-N-T-AC-O-M-T-MIP-E-N-fT-S-R--1-3-0---------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--0
CONG DIST. 5
ROW NONE $
0
CONST 1994
$
230
FUND SOURCE: !~STATE MAINT.
FED SHARE$ 230
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
71309X IS AN ASSOCIATED PROJECT.
0TH SHARE$
FULTON I-85 NB 62 SIGNS FROM I-285 TO SR 166 LAKEWOOD FWY .. CLAYTON
ATLANTA TIP f R 130
PE NONE $
0
71309Z SIGNING/ MAINTENANCE
CONG DIST. 5
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
713090 IS AN ASSOCIATED PROJECT.
0TH SHARE$
FULTON 713125
14 VARIABLE MESSAGE SIGNS, 2 PER FREEWAY INT WITH I-285 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
(.
ATLANTA TIP f R 166 CONG DIST. 5 -
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 4700 3760
940
FULTON 713130
SIGN UPGRADING I-285 WEST FROM I-20 TO I-75 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP f R 130
CONG DIST. 5 & 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 1000 1000
FULTON 713135
COMMUNICATION CONDUIT & CABLE ON DOWNTOWN CONNECTOR MISCELLANEOUS IMPROVEMENTS/ TRAFFIC
PROJECT MILEAGE : 7.00 - EXIST. LANES: o /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
ATLANTA TIP f R 167 CONG DIST. 5 .
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 5600 4480 1120
FULTON 713140
COMMUNICATION CABLE ON I-85 FM I-75 NORTH TO I-285 MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE: 10.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
ATLANTA TIP f R 168 CONG DIST. 4 & 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$
0TH SHARE$
0 0 2700 2160 540
FULTON 713145
COMMUNICATION CABLE ON I-75 FROM I-85 NORTH TO I-285 MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : 5.00 - EXIST. LANES: 0 /PROPOSED.LANES: 0
MANAGER: BURT RIDDLE
ATLANTA TIP f R 169 CONG DIST. 5 & 6
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 1300
1040 260
.
. ...
~
~
~
ee::xt
= ~
= ~
t,,~i~ta
~:,;:tm
-i;r.~
... Ir!~~~-$ ~J~~
= ~
ili~n:11
f*b!
f!.,..,"',,,,~a:.~
~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 151
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON COMMUNICATION CABLE ON I-75 FROM I-285 NORTH TO I-85
ATLANTA TIP f R 170
PE NONE $
0
713150 MISCELLANEOUS IMPROVEMENTS/ TRAFFIC
CONG DIST. 5
ROW NONE $
0
PROJECT MILEAGE : 6.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $ 2100
MANAGER: BURT RIDDLE
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE$ 1680
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 420
0TH SHARE$
FULTON 713170
BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 7 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
ATLANTA TIP f R 131 CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 1244 1120 124
FULTON 713180
BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 7 (TII ONLY) BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP t R 131
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 . $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1013 912 101
FULTON 713190
BRIDGE PAINTING PROJECT FOR FY 1994 - ATLANTA AREA
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN C
ATLANTA TIP f R 131 CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 1629 1466
163
FULTON 72012X
N'SIDE PKWY@ CHATTAHOOCHEE RVR INCL APPR/SEE COBB CO REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .00 MANAGER: BEN BUCHAN
ATLANTA TIP t AT12/C024
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 720125 IS AN ASSOCIATED PROJECT.
PE 1981 ROW 1985 CONST
UNDERWAY UNDERWAY.
AFTER 96
FULTON 720570
BANKHEAD HWY/SR 8 FM PROCTOR CRK TO .E OF SCL RR BRIDGE RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .44 MANAGER: BILL MOSKAL (M)
ATLANTA TIP f AT 4 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FULTON 720980
.SR 138/ RELOC FM 5 LN@ BETHSAIDA RD TO SR 279/0'NATL HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2.87 MANAGER: D. GODWIN
ATLANTA TIP f FS 12 CONG DIST. 6
F~ND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW 1990 UNDERWAY
CONST 1996 $ 6616
FED SHARE $ 5293
GA. SHARE $ 1323
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 152
COUNTY
DESCRIPTION
------ - - - - - - P.I.NO.
PROJECT DATA
FULTON STATE BRIDGE RD FM ALPHA CT/SR 400 TO PARK BR PKWY
720990 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.14
MANAGER: NEIL DAVIS
-- ------------CO-M--M-E-N-T-S-----------------"---------F-IYS-ECA-A-R-L-------EC-SO-TS-TS--
ATLANTA TIP f. FN 15
PE NONE
$
0
CONG DIST. 6
ROW 1992
UNDERWAY
CONST 1996
$ 8998
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 7198
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1800
0TH SHARE $
FULTON 721000
SR 120 FM PARK BR PKWY TO PEACHTREE IND BLVD/GWINNETT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 6.54 MANAGER: NEIL DAVIS (M)
ATLANTA TIP f RTP-FN 3
CON~ DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE ROW 1991 CONST
$
0
UNDERWAY
AFTER 96
FULTON 721010
SR 9/ROSWELL FM DUNWOODY PLACE TON/SR 120 RECONSTRUCTION & WIDENING FROM 3 LANES TO 4 LANES.
PROJECT MILEAGE : 1.78 MANAGER: RAY METTS (M)
ATLANTA TIP f FN 7 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FULTON 721300
SR 140/HOUZE RD FM MANSELL RD NORT.H TO NEAR RANCHETTE RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 4.55 MANAGER: RAY METTS (M)
ATLANTA TIP I FN 62
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FULTON 721305
SR 140/HOUZE RD FM RANCHETTE RD TO CR 311/CHEROKEE CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.25 MANAGER: RAY METTS (M)
ATLANTA TIP I FN 13
CONG DIST. 6
FUND. SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 "AFTER 96
FULTON 721308
SR 140/HOUZE RD@ LITTLE RIVER@ CHEROKEE CO LINE REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .OS
MANAGER: RAY METTS (M)
FULTON 721410
SR 166/CAMPBELLTON RD/ATLANTA FM ENON RD EAST TO BARGE RD RECONSTRUCTION& WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.80 MANAGER: G. ROSS (M)
{.
ATLANTA TIP I FN 13
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72130Z IS AN ASSOCIATED PROJECT.
ATLANTA TIP f AT,~2 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1991 ROW LOCL CONST
UNDERWAY AFTER 96
PE 1992 ROW
CO~ST
UNDERWAY AFTER 96 AFTER. 9,6
..
~
~
~
~.']
~e
~Y~~Jlli
!1~~~~t:r!
t!ll'~:~
Mill"'..!?;,
(.i,1;,.r,~i.,.,
~~
~~~
H~.;..:;:t:1ri;
I.... --~.
.. .'
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 153
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
FULTON SR 9@ C'HOOCHEE RVR/INCL INT @AZALEA & RIVERSIDE/& SIGNALS
ATLANTA TIP f FN 7
PE 1993
UNDERWAY
721460 REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 8 LANES.
CONG DIST. 6
ROW 1996
$ 1473
PROJECT MILEAGE : .29
CONST
AFTER 96
MANAGER: RAY METTS (M)
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
72Y460 IS AN ASSOCIATED PROJECT.
FULTON 721510
SR 120/ALPHARETTA FM SR 9/MAIN ST.EASTERLY TO SR 400 RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES. PROJECT MILEAGE : 1.33 MANAGER: NEIL DAVIS (C).
ATLANTA TIP f FN 16
CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$ 3760
CONST 1996
$ 3900
FED SHARE $ 3120
GA. SHARE $
7'80
0TH SHARE $
FULTON 721560
SR 14/US 29 FM SR 154 NEAR N CL/PALMETTO TO SR 74/FAIRBURN RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 4.60 MANAGER: D. GODWIN
ATLANTA TIP f FS 31 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW 1992
UNDERWAY
CONST 1996
$ 5064
FED SHARE $ 4051
GA. SHARE $ 1013
0TH SHARE $
FULTON 721570
SR 14 1-WAY PAIR/PALMETTO FM S CTY LMTS TO SR 154 NEAR N C.L RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.60 MANAGER: RON BRAZIEL (M)
ATLANTA TIP f FS 50 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FULTON 721700
CSX RR BRIDGE OVER SR 3/NORTHSIDE DR
BRIDGES/ REPLACEMENT PROJECT MILEAGE : .20 MANAGER: G. ROSS (M)
ATLANTA TIP f AT 73 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW NONE CONST
$
200
$
0
AFTER 96
FULTON 721710
SR 3/NORTHSIDE DR FM TRABERT AVE TO I-75 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .63 MANAGER: G. ROSS (M)
ATLANTA TIP f AT 30 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$
72
AFTER 96
AFTER 96
FULTON 721720
NORFOLK SOUTHERN RR OVER SR 3/NORTHSIDE DR BRIDGES/ REPLACEMENT PROJECT MILEAGE : .20 MANAGER: G. ROSS (M)
ATLANTA TIP t AT 74
CO~G DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW NONE CONST
$
200
$
0
AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993Page 154
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO,
PROJECT DATA
------------------------- ---------
--------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
FULTON SR 3/NORTHSIDE DR FM 14TH ST TO TRABERT AVE
ATLANTA TIP f AT 30
PE 1996
$
91
721730 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
CONG DIST. 5
ROW
AFTER 96
PROJECT MILEAGE: .55
CONST
AFTER 96
MANAGER: G. ROSS (M)
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADHIN FUNDS
FULTON 721750
SR 3/NORTHSIDE DR@ BANKHEAD HWY; @ NORTH AVE;@ MARIETTA ST. .INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE : .75 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: G. ROSS
r.
FULTON 72177X
SR 166 FM OLD LOWER RIVER RD TO SR 70 . SEE DOUGLAS CO UNKNOWN / UNKNOWN .. PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: G. ROSS (M)
FULTON 721780
SR 9/N MAIN ST FM ACADEMY ST TO WINDWARD PKWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.97 MANAGER: NEIL DAVIS (CM)
ATLANTA TIP f AT 76 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DO 19 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 721770 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f FN 67
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1993
UNDERWAY
ROW 1994
$ 1430
CONST 1995
$. 1130
FED SHARE $
904
GA. SHARE $
226
0TH SHARE $
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FULTON 72'1790
SR 9/S MAIN ST FM UPPER HAHBREE RD TO ACADEMY ST RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 1.70 MANAGER: NEIL DAVIS (CH)
ATLANTA TIP f FN 67 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FULTON 721810
SR 166/LAKEWOOD FWY@ GREENBRIAR PKWY/CAMPBELLTON RD ML9.37 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .84 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. CHURCH (H)
ATLANTA TIP f .AT 62 CO!"G DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AI>MIN FUNDS
PE 1995 ROW CONST
$ 198 AFTER 96 AFTER 96'
FULTON 721835
FREEDOM PARKWAY/SR 10: ICE CANOPY AT THE WSB TOWER BRIDGES/ NEW CONSTRUCTION PROJECT. MILEAGE :, .12 MANAGER: NEIL DAVIS
ATLANTA TIP f AT-R 41
CONG DIST, 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY .ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST1994
$.-2117
FED SHARE$ 1694
GA. SHARE$ 423
OTH- SHARE$
.
...
.. ,..
~
~
~.J
~JK... !I
Iw:~
~;:';f,i
~;4;}~
~;n:i!!l
ffilH~D$
u.~as);)~,,., c~~.jJ!i
l:ilK'J#i
tii~:u??i
/;_::;' -~~"i~~
1:,--:
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 155
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P .I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
F-U-L-T-O-N----F-R-E-E-D-O-M--P-K-W--Y-/S-R---1-0--FM---I--7--5-/I---8-5---TO---M-O-R-E-LA-N--D--A-V-E--&--P-.D--.-L-----------A-T-LA--N-T-A--T-I-P--f--A-T---R--4-1-------------------P-E--N-O-N-E-----$------o
721840 LANDSCAPING/ ENHANCEMENT
CONG DIST. 5
ROW NONE $
0
PROJECT MILEAGE : 2.00 - EXIST. LANES: 4 /PROPOSED LANES: 4
CONST 1996
$ 2000
MANAGER: NEIL DAVIS
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$ 1600
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
400
0TH SHARE$
FULTON 721850
SR 400@ HAMMOND DR AND ABERNATHY ROAD, CD SYSTEM INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.75 - EXIST, LANES: 8 /PROPOSED LANES: 14 MANAGER:. NEIL DAVIS (CM)
ATLANTA TIP.f FN-R 100 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1995 CONST
UNDERWAY $ 4000 AFTER 96
FULTON 721910
SOUTH FULTON PKWY PAVING FOR LANES 3 & 4 FM SR 154 TO SR 92
CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 4,30
C.
MANAGER: G. ROSS
FULTON 721920
SR 140/HOLCOMB BRIDGE RO BETWEEN BARNWELL RD & NESBITT FERRY TURN LANES/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FULTON 721930
SR 120 AT STATE BRIDGE ROAD TURN LANES/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FULTON 72Y460
SHOWN FOR SAFETY FUNDS ONLY ... SEE 721460
UNKNOWN/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M GANNAWAY
FULTON 72Y510
SR 120/ALPHARETTA FM SR 9 TO SR 400; FOR REST R/W $; 721510 RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES. PROJECT MILEAGE : 1.33 MANAGER:
ATLANTA TIP t FS 36
CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FN 87 CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FN 48 CONG DIST. 6 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FN 7 CONG DIST. 6 FUND SOURCE: NAT'L HIGHWAY FEDERAL .HIGHWAY ADMIN FUNDS 721460 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f FN 16 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 3000 2400
600
PE 1994
$
10
ROW 1995 $
10
CONST 1996
$
347
FED SHARE$
312
GA. SHARE$
35
0TH SHARE$
PE NONE $
0
ROW 1995 $
10
CONST 1996 $ 156
FED SHARE$
140
GA. SHARE$
16
0TH SHARE$
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
PE NONE ROW 1995 CONST NONE
$
0
$ 3000
$
0
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 156
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
-------------------- ---- ---
- ------ --------------------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
FULTON PARTIAL R/W FOR 721850
ATLANTA TIP f FN-R 100
PE NONE
$
0
72Y850 UNKNOWN/ UNKNOWN
CONG DIST. _5
ROW 1996
$ 4850
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE
$
0
MANAGER: -
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN. FUNDS
FULTON 730753
SOUTH FULTON PKWY FM COCHRAN MILL RD TO SR 154 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: G. ROSS
FULTON 730880
STATE BR RD FM MEDLOCK BR RD NW TO JONES BR RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.59 MANAGER: NEIL DAVIS (M)
ATLANTA TIP f FS 36 _CONG _DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FN 48 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
4600 3680
920
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
FULTON 730885
STATE BRIDGE RD@ JOHN'S CRK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .01 MANAGER: NEIL DAVIS
FULTON 730890
SR 70@ WHITE OAK;BEAR & PEA CREEKS
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .70
MANAGER: O. GODWIN
(,
FULTON 730940
CR 1323/HOPEWELL RD@ CHICKEN CREEK TRIBUTARY
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .20
.
MANAGER: O. GODWIN
FULTON 730960
CR 1374/BUTNER RD@ DEEP CREEK EAST OF SR 92 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ~19 MANAGER: D. GODWIN
ATLANTA TIP f FN 71 CONG DIST. 6 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FS 61 CONG DIST. 5. FUND SOURCE: BRIDGE PROGRAM FEDERAL-HIGHWAY ,ADMIN FUNDS
ATLANTA TIP f FN 72 CONG DIST._ 6 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP IFS 62 .CONG DIST_. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
_CONST 1996
$
288
FED SHARE$ 230
GA. SHARE$
58
0TH SHARE$
PE 1990 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$ 1412
FED SHARE$ 1130
GA. llHARE $ 282
0TH SHARE$
PE 1991
UNDERWAY
ROW LOCL
CONST 1994
$
146
FED-SHARE$
117
GA. SHARE $ - 29
0TH SHARE$
PE 1993
UNDERWAY
ROW LOCL
CONST 1996
$
332
FED SHARE$
266
GA. SHARE$
66
0TH SHARE$
...
~
== ~ ~ ~ ~\lflf.,!
ID:+~~
~it~
~
!C,7-1'-:::,'.3
l'!!:.'!!;.,ij,,. tl:!K;..~
16"~!0\<::f!
~'ry.'r.:;:~~
fr.f~."'>~?
~~;'/'~~~~
.. i~r~
..,
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 157
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.N--O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON SR 166/CAMBELLTON RD FM FULTON IND BLVD TO CR 492iWALLACE RD
ATLANTA TIP f FS 27
PE 1992 UNDERWAY
730990 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 5
ROW
AFTER 96
PROJECT MILEAGE : 2.99
CONST
AFTER 96
MANAGER: G. ROSS (M)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY AOMIN FUNDS
FULTON 731420
SR 120/ABBOTTS BRIDGE RO@ JONES BRIDGE RD TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER:
FULTON 731430
STATE BRIDGE ROAD FM ALPHA COURT TO PARK BRIDGE PARKWAY LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 2.34 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: NEIL DAVIS
FULTON 742492
SR 166/LAKEWOOD FWY EB EXIT RAMP@ SYLVAN RD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .19 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GODWIN
FULTON 742700
SR 120 FM 950' NW BOLES RO TO 950' S/BOLES RO/CR 72
TURN LANES/ TRAFFIC PROJECT MILEAGE : .32 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN
FULTON 74290X
LOWER RIVER RD FM SR 92/FAIRBURN RO TO COBB CO LINE/DOUGLAS
UNKNOWN/ UNKNOWN PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
(.
FULTON 750455
TECHWOOO OR EXTEN FM CHAPEL ST TO SPRING ST. "CITY" CONSTRUCTION OF NEW ROUTE WITH 3 LANES PROPOSED,
PROJECT MILEAGE : .40 MANAGER: BEN BUCHAN
ATLANTA TIP f FN 3 CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
ATLANTA TIP f FN 15 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f AT-Rll6 CONG DIST. 5 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FN 70 CONG DIST. 6 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
ATLANTA TIP f DO 21 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 742900 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f R 6 CONG ~IST. 5 FUND SOURCE: I-STATE CONST. FEDERAL HIGHWAY ADMIN FUNDS 751900 IS AN ASSOCIATED PROJECT.
PE 1994 $
19
ROW 1995 $
10
CONST 1996 $ 406
FED SHARE$ 365
GA. SHARE$
41
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1996 $ 298
FED SHARE$ 230
GA. SHARE$
59
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1995 $ 143
FED SHARE$ 129
GA. SHARE $
14
0TH SHARE$
PE NONE $
0
ROW LOCL
CONST 1994 $ 280
FED SHARE$ 252
GA. SHARE$
28
0TH SHARE$
PE 1996 ROW LOCL CONST
$
0
AFTER ~6
PE 1992 UNDERWAY ROW 1994 $ 1799 CONST 1994 $ 13065
FED SHARE $ 11105 GA. SHARE $ 6241 0TH SHARE $ 9201
r
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 158
COUNTY
DESCRIPTION
----P. I.NO.
--
PROJECT DATA
-
- -------
FULTON BANKHEAD HWY/SR 8 FM HARWELL RD TO SR 280/HIGHTOWER RD
750780 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.25
MANAGER: D. SMITH (M)
FISCAL
COST
COMMENTS
--------------------------------------.
----------Y-EA-R---------E-S-T-S--
ATLANTA TIP I AT 1
PE 1995
$
100
CONG DIST, 5 .
ROW 1995
$
300
CONST
AFTER 96
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
FULTON 751030
HERSCHELL RD/COLLEGE PARK@ CAMP CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .10 MANAGER: D. GODWIN
ATLANT~ TIP f FS 67 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1988 ROW LOCL CONST
UNDERWAY AFTER 96
FULTON 751090
CLEVELAND AVE FM STEELE NR I-75 TO JONESBORO RD MISCELLANEOUS IMPROVEMENTS/ RECST. OR REHAB.
PROJECT MILEAGE : 1.80 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: G. ROSS ..
ATLANTA TIP I RTP D -AT16
CONG DIST; 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FULTON 751100
CLEVELAND AVE EXTENSION FM JONESBORO RD TO MORELAND AVE CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : __ 90 MANAGER: G, ROSS
ATLANTA TIP I RTP D ~AT15 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 ROW 1992 CONST
UNDERWAY UNDERWAY AFTER 96
FULTON 751130
CLEVELAND AVE FM SYLVAN RD TO I-85 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : ,40 MANAGER: G, ROSS
FULTON 751140
WASHINGTON RD/E.POINT FM DELOWE DR TO LEGION WAY RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : .90 MANAGER: BILL MOSKAL
ATLANTA TIP f AT 18 CONG DIST. 5
FUND SOURCE: I-STATE CONST. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FS 25 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW 1992
UNDERWAY
CONST 1994
$ 1022
FED SHARE $
869
GA. SHARE $. 153
. 0TH SHARE $
PE 1996 ROW LOCL CONST
$
100
AFTER 96
FULTON 751146
WASHINGTON RD/E POINT FM I-285 TO DESERT DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .BO MANAGER: BILL MOSKAL (CM
ATLANTA TIP I F_S, 17 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY -!'J)MIN FUNDS
PE 1996 ROW LOCL CONST
$
100
AFTER 96
~
..
a!!!)
~
~
~
~
~
~I.~~il
~~
~
~~~;~ ,,. tr::~~11
r.:e.:.'i~
jilfa~,iii
/;'.J'.'.,:i/i!!
v:~~~y.~:~
!~...,,.,,ii
.
. !-:-.. ,,,__J, ,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 159
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
F-UP-L-.T-IO.-NN-O--. --ST-A-T-E--B--R-ID-G-E--R-DP-R-OF-M-JE-C-STT-A--TDE-A-TA-B-R-ID-G--E--W-A-Y--T-O--JO-N--E-S--B-R-ID-G--E--R-D------------A-T-LA--N-T-AC-O-MT-MI-PE-N-fT-S-FN---4-8---------------------P-EY-E-A1-R9-9-6-----$-E-S-T-S-1-01
751410 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 6
ROW LOCL
PROJECT MILEAGE : 1.52 MANAGER: NEIL DAVIS
r.
FUND _SOURCE: SURFACE TRANSPORT.
CONST
AFTER 96
FEDERAL HIGHWAY ADMIN FUNDS
FULTON 75143X
FRNTG RD 1-WY PAIR FM ROTTENWOOD CK TO NORTHSIDE DR/COBB
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 ./PROPOSED LANES: 0
MANAGER: D. SMITH (M)
FULTON 751555
RIVERSIDE RO/ROSWELL@ BIG CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .25 MANAGER: RAY METTS (M)
FULTON 751560
HOWELL MILL RD/ATLANTA FM OLD CHATTAHOOCHEE TO BELLMEADE AVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: D. CHURCH (M)
ATLANTA TIP f CO-R 67 CONG DIST. 6
ruNO SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 751430 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f FN 26 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDER.AL HIGHWAY ADMIN FUNDS 721460 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f AT 26 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
PE 1996 ROW LOCL CONST
$
9
AFTER 96
FULTON 751900
SR 14/US 29/PETERS ST@ L&N AND C OF G RR APPR. l MI N/I-20 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES. PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN
FULTON 751990
SR 166/CAMBELLTON RO FM CR 482 TO ENON RO/CR 485 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.95 MANAGER: G. ROSS (M)
ATLANTA TIP f AT 71 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 750455 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f FS 27 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDER.AL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1994
$ 3729
FED SHARE $ 2983
GA. SHARE $ 746
0TH SHARE $
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
FULTON 752010
COURTLAND ST OVER DECATUR ST REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .10 MANAGER: BEN BUCHAN
ATLANTA TIP f AT 70 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDER.AL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$
337
FED SHARE$ 270
GA, SHARE$
67
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 160
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
F-U-L-T-O-N-----C-O-U-R-T-LA-N-D---S-T--OVER-C--SX---R-R----
-----------------------------------A-T-L-A-N-T-AC-O-MT-MI-PE-N-fT-S-A-T--7-0---------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S-- 0
752015 REPLACEMEN.T OF THE EXISTING BRIDGES (S). NO ADDED LANES.
CONG DIST. s
ROW LOCL
PROJECT MILEAGE : .10
CONST 1994
$
685
MANAGER: BEN BUCHAN
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 548
FEDERAL HIGHWAY AD~IN FUNDS
GA, SHARE$
137
0TH SHARE$
FULTON 752020
PEACHTREE ST@ GEORGIA RR & MARTA AT UNDERGROUND ATLANTA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN
r..
FULTON 752030
INTERNATIONAL BLVD@ CSX & NORFOLK-SOUTHERN RR@ THE OMNI REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : 50 MANAGER: BEN BUCHAN
ATLANTA TIP f AT 69 CONG DIST . 5 .'
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
-c
ATLANTA TIP f AT 68 CONG DIST:-s
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW LOCL
CONST 1995 $ 1650
FED SHARE$ 1320
GA. SHARE $
330
0TH SHARE$
PE 1993
UNDERWAY
ROW LOCL
CONST 1995 $ 1580
FED SHARE$ 1264
GA. SHARE$
316
0TH SHARE$
FULTON 752040
ROXBORO RD FM E PACES FERRY RD TO ROCKHAVEN CIR & SOU RR BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : .20
MANAGER: NEIL DAVIS (CM)
ATLANTA TIP f AT 9 CONG DIST. _4 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
50
AFTER 96
FULTON 752050
HAYNES BR RD/CR 1334 FM 1000' N/SR 400 NW TO SR 120
RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES.
PROJECT MILEAGE : 1_.04
.
MANAGER: NEIL DAVIS (C)
FULTON 752070
SR 139@ FAIRBURN RD;LYNHURST DR;FM FLORIDA AV TO BARFIELD INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE : .SO - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GODWIN
FULTON 752080
PIEDMONT AVE: CSX RR BRIDGE & RETAINING WALLS TO BUTLER ST.
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .SO MANAGER: BEN BUCHAN
ATLANTA TIP f FN 12
CONG DIST. 6
..
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW LOCL
CONST 1994 $ 3500
FED .SHARE$ 2800
GA. SHARE$ 700
0TH SHARE$
ATLANTA TIP f AT 79 CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
1000 800 200.
ATLANTA TIP f AT 82
CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995
$ 2104
FED SHARE$ 1683
GA. SHARE$
421.
0TH SHARE$
'"-
..
== ~ ~ ~
,.
~
ci:m=
= =
== = . R.!l= ~~M'.~
., l~fR?~~ et\~:.~ Ji~;.~ B!~;,.itf~1 r;:.~.,~~ :-::'".-:, .i,.-
.,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 161
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON CENTRAL AVENUE OVER CSX RAILROAD
ATLANTA TIP f AT 85
PE 1993 UNDERWAY
752082 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
CONG DIST. 5
ROW LOCL
PROJECT MILEAGE : .50
CONST 1995
$
755
MANAGER: BEN BUCHAN
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
604
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
151
0TH SHARE$
FULTON 752084
TECHWOOD DR OVER CSX RAILROAD & NORFOLK-SOUTHERN RAILWAY REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN
ATLANTA TIP f AT 87 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1994
$
843
FED SHARE$
674
GA. SHARE$
169
0TH SHARE$
FULTON 752086
SPRING STREET OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN
[
ATLANTA TIP f AT 86 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW LOCL
CONST 1994
$
843
FED SHARE$
674
GA. SHARE$
169
0TH SHARE$
FULTON 752090
ROXBORO ROAD FROM PRITCHART WAY TO EAST PACES FERRY RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .32 MANAGER: NEIL DAVIS (M)
ATLANTA TIP t AT 9
CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
ROW LOCL CONST
UNDERWAY AFTER 96
FULTON 752130
AUBURN AVENUE PEDESTRIAN SYSTEM FM PARK PL TO BOULEVARD BICYCLE/PED. FACILITY/ OTHER PROJECT MILEAGE : 1.20 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G, BOULINEAU
FULTON 752140
PEACHTREE ST PEDESTRIAN SYSTEM FM MEMORIAL DR TO PINE ST BICYCLE/PED. FACILITY/ OTHER PROJECT MILEAGE : 4,70 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: G. BOULINEAU
FULTON 752150
WINDSOR PARKWAY AT NANCY CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .40" MANAGER: D. GODWIN
ATLANTA TIP f AT-R 144 CONG DIST. 5 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f AT-R 143 CONG DIST. 5 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t FN 21 CON.G DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0 1000
800
200
PE LOCL ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$ 0TH SHARE$
0 5925 4740
1185
PE 1993 UNDERWAY
ROW LOCL
CONST 1995
$
100
FED SHARE$
80
GA. SHARE$
20
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 162
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO,
F-U-L-T-O-N-----G-LE-N-W--O-O-D--A-VE
PROJECT DATA
--------- FROM CONNALLY STREET
TO
H--IL-L---S-T-R-E-E-T-
---------------A--TL-A-N-T-A-CO-M-T-MIP-E-N-fT-S-A-T--5-7---------------------P-EY-E-A1-R9-9-3-----U-NE-DS-ETR-SW--AY
752160 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
CONG DIST, 5
ROW LOCL
PROJECT MILEAGE : ,20
CONST 1995
$
250
MANAGER: G, ROSS
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
200
FEDERAL' HIGHWAY ADMIN FUNDS
GA, SHARE$
50
0TH SHARE$
FULTON 752230
SR 54/JONESBORO RD. OVER THE SOUTH RIVER IN ATLANTA REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES, PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP f AT 95 CONG DIST-. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW CONST
$
24
AFTER 96
AFTER 96
FULTON 752320
POWERS FERRY RD/CR 300 OVER LONG ISLAND CREEK REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES, PROJECT MILEAGE : ,00
MANAGER:
ATLANTA TIP f FN 85 CONG DIST, 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW LOCL CONST
$
5
AFTER 96
FULTON 762240
BUTLER ST/CS 2051: CSX RAILROAD OVER BUTLER STREET
BRIDGES/ RECST, OR REHAB, PRO.iECT MILEAGE : .SO . MANAGER: 'BEN BUCHAN .
FULTON 770274
CR 593/0LD BILL COOK RD NE OF UNION CITY@ MORNING CRK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PR~JECT MILEAGE : .40 MANAGER: D, GODWIN
FULTON 770276
t
FORSYTH ST/C.S. 203B OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN
FULTON 770277
PRYOR ST/CS 2044 OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN
ATLANTA TIP f AT B4
CON,-G DIST. 5 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWA ADMIN FUNDS
ATLANTA TIP f FS 63 CONG DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t AT BO.
CONG DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY .ADMIN FUNDS
ATLANTA TIP f AT B3 CONG_ DIST. 5_ FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995
$
341
FED SHARE$ 273
GA, SHARE$
68
0TH SHARE$
PE 1995 $
5
ROW LOCL
CONST 199.6
$
112
FED SHARE$
90
GA. SHARE$
22
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1994
$ 1241
FED SHARE$
993
GA. SHARE$ 248
0TH SHARE$
PE 1993 UNDERWAY.
ROW LOCL
CONST 1994
$
562
FED SHARE$
450
GA. _SHARE $ 112
0TH SHARE$
"J
,_
.. ..
~
~
lfl.M
~ ,.
~'ffll
~
~~~al
~1fc:!il
~~9f~~M
.. eK.i~~ ~
~(!ff!!'!!
lf.4~~
~#
~,.;'....... :~
.:,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 163
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
--------------------------------------
-----------------------------------CO-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
FULTON CR 485/ENON ROAD@ CAMP CK TRIB N OF FAIRBURN
ATLANTA TIP f FS 65
PE 1994
UNDERWAY
770278 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 5
ROW LOCL
PROJECT MILEAGE : .20
CONST 1996
$
150
MANAGER: D. GODWIN
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
120
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
30
0TH SHARE$
FULTON 77030X
COMMUTER RAIL STUDY EVAL 12-RAIL CORR IN METRO TO BIBB CO. SPECIAL STUDIES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
ATLANTA TIP f R 133 CONG DIST, 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 770300 IS AN ASSOCIATED PROJECT.
PE 1993 ROW NONE CONST NONE
UNDERWAY
$
0
$
0
FULTON 770310
ATLANTA MULTI-MODAL PASSENGER TERMINAL DESIGN
PRELIMINARY ENGINEERING/ PLANNING
PROJECT MILEAGE : .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. CHAMBERS
.
ATLANTA TIP f R 120 CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW NONE CONST NONE
$ 7786
$
0
$
0
FULTON 770380
AERIAL SURVEILLANCE FOR INCIDENT MANAGEMENT ATLANTA REGION MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
FULTON 770390
DEVELOPMENT HARDWARE FOR ATMS REGIONAL PROJECT MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
FULTON 770400
TRAFFIC SIGNAL UPGRADES CITY OF ATL. FOR ATMS, 100 INTERSEC
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
FULTON 770401
COMPUTER HWDWARE/SOFTWARE-ATL REGIONAL TRANS MANAGEMENT SYS
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
ATLANTA TIP f R 171 CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
750
FED SHARE$
600
GA. SHARE$
150
0TH SHARE$
ATLANTA TIP t R 98
PE NONE $
0
CONG DIST. 5
ROW NONE $
0
CONST 1994
$
600
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE$ 480
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 120
0TH SHARE$
ATLANTA TIP f R 98 CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 5000
4000 1000
ATLANTA TIP t R 98
PE NONE $
0
CONG DIST. 5
ROW NONE $
0
CONST 1994
$
155
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE$
124
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
31
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 164
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
----- -- --- P. I.NO.
-
FULTON
PROJECT DATA
- TRAFFIC S. IGNAL UPGRADES CITY OF ATL.
FOR ATMS,
135
INTERSE-C-------A-T-L-A-N-T-AC-O-MT--MIP-E-N-IT-SR---98-----------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--0
770402 SIGNALS/ TRAFFIC
CONG DIST. 5
ROW NONE $
0
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$ 6210
MANAGER: BURT RIDDLE
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE$ 4968
....
FEDERAL HIGHWAY ~MIN FUNDS
GA. SHARE$ 1242
0TH SHARE$
FULTON 770404
ATL TRANS MGMT SYS -MANAGEMENT CENTER & CONTROL CTR HARDWARE EQUIP, PURCHASE/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
ATLANTA TIP f R 98
CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FE]D SHARE$
GA. SHARE ,$
0TH SHARE$
0 0 4000 3200
BOO
FULTON 770405
ATL TRANS MGMT SYS -UPGRADE CITY ATL TRAFFIC OPERATIONS ROOM MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
ATLANTA TIP f R 98
PE NONE . $
0
CONG DIST. 5
ROW NONE $
0
CONST 1994 $ 250
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE$ 200
FEDERAL HIGHWAY ADMIN FUNDS
GA, SHARE$
50
0TH SHARE$
FULTON 770410
DESIGN FOR HOV LANE COMMUTERIDE SHARE PROGRAM HOV LANES/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ATLANTA TIP IR 174 CONG DIST. 5
PE 1994 $
80
ROW NONE $
0
CONST NONE $
0
FUND SOURCE: CONG MIT./AIR QUAL
FEDERAL HIGHWAY ADMIN FUNDS
FULTON 770450
HISTORIC DEPOT RENOVATION IN FAIRBURN MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FULTON 770490
TRAIL SYSTEM IN ROSWELL BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FULTON 770510
BICYCLE/PEDESTRIAN/LANDSCAPING IN ALPHARETTA BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ATLANTA TIP IFS 64 CONG DIST, 5 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I FN 80 CONG D~ST. 6 FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I FN 81 CONG DIST. 6 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996 $ 188
FED SHARE$ 150
GA;- SHARE $
0TH SHARE$
38
PE LOCL ROW LOCL CONST 1996 $ 711
FED SHARE $ 569 GA. SHARE$ 0TH SHARE$ 142
PE LOCL ROW LOCL CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
1250 1000
250
..
~ -
~
~
~!I,~
~
"
~
~
~ m:"'-"':Tcl
-CTC.:C,=
-=s.;:_,.a
ffl'.~-~ ft!?:l!:!.ffi
I)
tifJ;'\i~
~-~v
.. ~ . :
t:--'"~'..!i
.. . ~-
,,........ ~.... ,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 165
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O-.----------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FULTON FROM FREEDOM PARKWAY TO GA TECH TO OLYMPIC SITES
ATLANTA TIP f AT 94
PE LOCL
770520 BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST. 5
ROW LOCL
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1995
$
300
MANAGER: UNKNOWN
FUND SOURCE: TRANS. ENHANCE.
FED SHARE$ 240
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
60
FULTON 770540
CAPITOL AVE PEDESTRIAN CORRIDOR FM STADIUM TO GA STATE MARTA BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .90 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
ATLANTA TIP f R 146 CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
5000 4000
1000
FULTON 770545
PEDESTRIAN BRIDGE/CORRIDOR FM OOME/WCC TO FIVE POINTS
BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER: T, DUNAGAN
ATLANTA TIP f R 147 CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
2200 1760
440
FULTON 770550
INTERNATIONAL BLVD PEDESTRIAN CORRIDOR FM wee TO PIEDMONT AV
BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .85 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ATLANTA TIP f R 145 CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
4000 3200
800
FULTON 770555
ATLANTA UNIVERSITY PROMENADE FM WEST ENO TO MLK PRELIMINARY ENGINEERING/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: T. DUNAGAN
ATLANTA TIP f R 148 CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
500
ROW NONE
$
0
CONST NONE $
0
FULTON 770560
BRIDGE PAINTING PROJECT - DISTRICT 7; ALSO 77Y560 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
FULTON 770570
BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 7 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
ATLANTA TIP f R 131 CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 131 CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
263
FED SHARE$ 210
GA. SHARE$
53
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994 -$
600
FED SHARE$ 480
GA. SHARE$ 120
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 166
COUNTY
DESCRIPTION
FISCAL
COST
-- P. I.NO.
PROJECT DATA
F-U-L-T-O-N-----IN-C--ID-E-NT RESPONSE V-E-H-IC-L-E-S-- (5)
------
--------------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
ATLANTA TIP f R 172
PE NONE $
0
770593 VEHICLE PURCHASES/ TRAFFIC
CONG DIST. 5
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
318
MANAGER: BURT RIDDLE
FUND SOURCE.: CONG MIT./AIR QUAL
FED SHARE$ 254
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
64
0TH SHARE$
FULTON 770595
ADDITIONAL INCIDENT MANAGEMENT PROGRAM
MISCELLANEOUS IMPROVEMENTS/ TRAFFIC
PROJECT MILEAGE : .00 - EXIST; LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
.
ATLANTA TIP t R 173
CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW NONE $ CONST 1996 $ . .FED SHARE $
GA. SHARE$ 0TH SHARE$
0 1000
800 200
FULTON 770597
BICYCLE FACILITIES AT COMMUTER AND HIGH DENSITY AREAS BICYCLE/PED. FACILITY/ OTHER PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE COUSINS
ATLANTA TIP f R 177 CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL
FEDERAL HIGHWAY ADMIN FUNDS
'
'
'
PE LOCL
ROW NONE $
0
CONST 1996 $ 500
FED SHARE$ 400
GA. SHARE$
0TH SHARE$ 100
FULTON 770605
TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN FULTON COUNTY SIGNALS / TRAFFIC
PROJECT MILEAGE : .00 - EXIST. LANES: Q /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
ATLANTA TIP f FN86/FS48 CONG ~IST. 5 & 6 .
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
50
ROW NONE $
0
CONST 1995 $ 460
FED SHARE$ 368
GA. SHARE$
0TH SHARE$
92
FULTON 770610
TRAFFIC DETECTION ENHANCEMENT MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
ATLANTA UP .f R 175 CONG DIST ..!>
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $
CONST. 1995 $ FED SHARE$
GA. SHARE$ 0TH SHARE$
0
0 2000 1600
400
FULTON 770630
EMISSION INSPECTION & MECHANIC TRAINING TRAINING PROGRAM MISCELLANEOUS IMPROVEMENTS/ OTHER PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: LUKE COUSINS
ATLANTA TIP f R 158 CONG DIST.' 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL ~EDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1995 $ 750
FED SHARE$ 600
GA. SHARE$
0TH SHARE$ 150
FULTON 770631
REGIONAL RIDESHARE PROGRAM RIDE SHARING/ OTHER PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: LUKE COUSINS
ATLANTA TIP f R 159 CONG DIST. 5 & 4 .
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
- FED SHARE $
GA. SHARE$ 0TH SHARE $ -
0
0 3000
2400 600
.
.,
.:,
~
~
~
~ ,.
~
~~!IX~
~JL1ijl
~'~
~
., ~!2~ ~~'!~
t:~!i!i.~
l'@~\:.'.&1
k~!n~
.,~ ...... ~.
I ... ~
,,
.,,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 167
PROJECT LISTING BY (OUNTY FY 199~/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
FULTON MARTA EXPRESS BUS ROUTES - 3 ROUTES FOR 3 YEARS
ATLANTA TIP f M-R 160
PE
AFTER 96
770632 MISCELLANEOUS IMPROVEMENTS/ OTHER
CONG DIST. 5 & 4
ROW NONE
$
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1996 $ 5400
MANAGER: LUKE COUSINS
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE $ 4320
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
0TH SHARE $ 1080
FULTON 770633
MARTA DEMAND RESPONSIVE MINI-BUSES (2) FOR ONE YEAR MISCELLANEOUS IMPROVEMENTS/ OTHER
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: o
MANAGER: LUKE COUSINS
ATLANTA TIP f M-R 161 CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE
AFTER 96
ROW NONE
$
0
CONST 1996 $ 362
FED SHARE $ 290
GA. SHARE $
0TH SHARE $
72
FULTON 770634
PURCHASE 15 CLEAN ENGINE MARTA BUSES EQUIP. PURCHASE/ CAPITAL PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE COUSINS
ATLANTA TIP f M-R 162 CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0 0
3550 2840
710
FULTON 770636
MARTA BUS PRIORITY CONTROL SYSTEMS@ HIGH TRANSIT SIGNALS MISCELLANEOUS IMPROVEMENTS/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE COUSINS
ATLANTA TIP I M-R 164 CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 $
30
ROW NONE $
0
CONST 1996 $ 500
FED SHARE$
400
GA. SHARE$
0TH SHARE$
100
FULTON 770637
SIDEWALKS AT RAIL STATIONS, HIGH BUS AND PEDESTRIAN LOC
SIDEWALKS/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: LUKE COUSINS
ATLANTA TIP f R 165 CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE
AFTER 96
ROW NONE $
0
CONST 1996 $ 6000
. FED SHARE $ 4800
GA. SHARE $
0TH SHARE $ 1200
FULTON 770638
TRAFFIC OPERATIONS IMPROVEMENT PLANS FOR HIGH CONGESTED LOC
MISCELLANEOUS IMPROVEMENTS/ OTHER PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE COUSINS
ATLANTA TIP IR 176 CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
3000 2400
600
FULTON 770660
MARTA ADA PARATRANSIT/RAIL STATION MODIFICATIONS; PHASE 2
TRANSIT PROJECTS/ CAPITAL PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP IR 150 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
2180 1744
436
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
r,EORGIA DEPARTMENT OF TRANSPORTATION STl\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
FULTON 77U330
OLYMPICS TRANSPORTATION PLANNING - 1995 FUNDING PRELIMINARY ENGINEERING/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
ATLANTA -TIP .f R 149 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDER.AL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 168
FISCAL YEAR
COST ESTS
PE 1995
$
250
ROW NONE
$
0
CONST NONE
$
0
FULTON 77W330
OLYMPICS TRANSPORTATION PLANNING - 1996 FUNDING PRELIMINARY ENGINEERING/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP f R 149 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
$
250
ROW NONE
$
0
CONST NONE $
0
FULTON 77Y330
OLYMPICS TRANSPORTATION PLANNING - 1994 FUNDING
PRELIMINARY ENGINEERING/ PLANNING
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
-.
ATLANTA TIP f R 149 CONG.DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
250
ROW. NONE $
0
CONST NONE
$
0
FULTON 77Y560
BRIDGE PAINTING PROJECT - DISTRICT 7; FOR IM$; SEE 770560 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP f R 131 CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
654
FED SHARE $
589
GA. SHARE$
65
0TH SHARE$
' ,.
., f
'.
~
== ~ ~ ~ ~ ~
~~.ml
&!rt~:~
~K~ ~):C!t1
"
t:~:~
i;~L~~
jrii~
I ..........,:~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
GILMER 6Bl353
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GILMER MANAGER: STEVE KISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
.. .
16-Sep~l993 Page 169
FISCAL YEAR
COST ESTS
OPERATING 1994 $
58
FED SHARE$
34
GA. SHARE$
0TH SHARE$
24
GILMER 6B1354
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GILMER MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
62
FUND SOURCE: RURAL TRANSIT
FED SHARE$
36
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
26
GILMER 6B1355
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GILMER MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1996 $
64
FUND SOURCE: RURAL TRANSIT
FED SHARE$
37
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
27
GILMER 6C2353
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GILMER MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1994
$
28
FUND SOURCE: RURAL TRANSIT
FED SHARE$
22
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
GILMER 61Y980
DECK OVERLAYS FOR 115-0006; 115-0007; 123-0024; 129-0066
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: UNKNOWN
PE NONE $
0
CONG DIST. 9 & 7
ROW NONE $
0
CONST 1994 $ 535
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 428
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 107
610980 IS AN ASSOCIATED PROJECT.
0TH SHARE$
GILMER 621270
SR 282 EB FM MP 1.7 TO 3.4; EB FM MP 8.2 TO 9.95
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.45 MANAGER: BILL MCVEY
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994 $
15
CONST 1995 $ 1511
FED SHARE$ 1209
GA. SHARE$ 302
0TH SHARE$
GILMER 631080
SR 52 LEFT TURN LANE@ SR 2 TURN LANES/ TRAFFIC PROJECT MILEAGE : .15 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: BILL MCVEY
PE NONE $
0
CONG DIST. 9
ROW NONE $
0
CONST 1994 $
87
FUND SOURCE: HWY. SAFETY
FED SHARE$
78
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
9
631090 IS AN ASSOCIATED PROJECT.
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 170
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GILMER SR 2@ CARTECAY RIVER
PE 1992 UNDERWAY-
631090 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
CONG DIST. 9
ROW 1993. UNDERWAY
PROJECT MILEAGE: .13
CONST 1994
$
423
MANAGER: BILL MCVEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
338
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
85
631080 IS AN ASSOCIATED PROJECT.
0TH SHARE $
GILMER 631100
SR 282/ELLIJAY FM CR 39/MADDOX DR TO SR 5/US 76 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.17 MANAGER: J. GRAYBEAL (C)
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$ 1620
CONST 1995 $ 2826
FED SHARE $ 2261 .
GA. SHARE $ '565
0TH SHARE $
GILMER 631110
SR 52 EB FM MP 16.0-17.8; WB MP 18.8-20.17 ADDITION OF A PASSING LANE. PROJECT MILEAGE: 3.17 MANAGER: BILL MCVEY-
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
ROW 1996 CONST
UNDERWAY
$
35
AFTER 96
GILMER 631260
I.
SR 382 EXT FM CR 239/0LD SR 5 TO NEW APO CORRIDOR/SR 5CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE: .75 MANAGER: BILL MCVEY (M)
CONG DIST .. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
40
AFTER 96
GILMER 631430
SR 2/SR 52@ MOUNTAINTOWN CREEK 6.7 MI NW OF ELLIJAY REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .23 MANAGER:
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN. FUNDS
-PE 1994
$
17
ROW 1995 $
10
CONST 1996 $ 571
FED SHARE$
457
GA. SHARE$ 114
0TH SHARE$
GILMER SR 515 FM CR 300 (PICKENS) TO UNION CL .. PICKENS/FANNIN 67080X RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 9
PE NONE
$
0
ROW 1994
$
0
PROJECT MILEAGE : 48.26 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
670800 IS AN ASSOCIATED PROJECT.
0TH SHARE$
.. ' ..
~
P!!!!l!!!l!l . ~
~
~
"~ "'=
~
t~ z = m
~
~ ii1::'.'!l:'.O
"
B,{!~f\~~
h:::~:<-:cil
r~:~_._.. :.~~1
,~~~
,.............,
..l-
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 171
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. I-.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GLASCOCK COUNTY OPERATED PUBLIC TRANSIT SERVICE
281113 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 11
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH
C.
FUND SOURCE: RURAL TRANSIT
OPERATING 1994
$
32
FED SHARE$
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
GLASCOCK COUNTY OPERATED PUBLIC TRANSIT SERVICE 281114 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1995 $
34
FUND SOURCE: RURAL TRANSIT
FED SHARE$
19
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
15
GLASCOCK COUNTY OPERATED PUBLIC TRANSIT SERVICE 281115 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1996 $
35
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
20
GA. SHARE$
0TH SHARE$
15
GLASCOCK ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO 2C2113 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
'
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 172
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
----------------------------------------
---------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GLYNN ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
5Vl013 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 1
FUNDS RECIPIENT: AGENCIES IN GLYNN MPO AREA MANAGER: STEVE KISH
CAPITAL 1994
$
16
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
.
0TH SHARE$
2
GLYNN 5V1014
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN GLYNN MPO AREA MANAGER: STEVE KISH
CONG DIST. 1
CAPITAL 1995
$
17
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
GLYNN ELDERLY AND DISABLED"VEHICLES AND EQUIPMENT
5Vl015 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 1
FUNDS RECIPIENT: AGENCIES IN GLYNN MPO AREA
r.
CAPITAL 1996
$
17
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED_ SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
GLYNN 51108X
I-95 FM CR 138/CAMDEN TO US 17 .. SEE CAMDEN CO
UNKNOWN/ UNKNOWN
PROJECT MILEAGE : - 00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
-
BRUNSWICK TIP f BATS93-11
PE 1994 $
0
CONG DIST. 1
ROW NONE $
0
CONST 1996 $
0
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
511084 IS AN ASSOCIATED PROJECT.
0TH SHARE$
GLYNN 511090
I-95 FM US 17/SR 520 S/BRUNSWICK TO US 341 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.68 MANAGER: M. REYNOLDS (M)
BRUNSWICK TIP f BATS93-09 CONG DIST_. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
GLYNN 511100
I-95 FM US 341 TO ALTAMAHA RIVER@ MCINTOSH CO LINE RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 8.66 MANAGER: M. REYNOLD$ (M)
BRUNSWICK TIP f BATS93-10 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ~MIN FUNDS
PE.1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
GLYNN 520890
SR 25/BRUNSWICK FM S OF TORRAS CAUSEWAY N TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 1.97 MANAGER: D. CHURCH (C)
BRUNSWICK TIP f BATS93-05 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW 1994
$ 1815
,CONST 1996
$ 4048
- FED SHARE $ 3238
GA. SHARE $
810
0TH SHARE $
... ".
~
-
~
~
~
~ ~
rn~~
~.!9.ffl
= =
t~:,:rn
~
lr'.!fL~!!
llJ/iil'.~
,r:: :.:.:j:d
~~
~-1.' ....
...
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 173
'PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
G-PL-Y-.IN-.NN--O-.--S-R--5-2-0-/-J-E-K-Y-L-L--P-ISR-LO-A-JNE-DC-T--RD-DA-@-TA--JE-K-Y--L-L--R-IV-E-R-----------------------------B-R-U-N-S-W-CI-OC-KM-M-TE-IN-PT-S-f--B-A-T-S-9-3---2-1---------------P-EY-EA-1-R9-8-5-----U-EN-DS-TER-SW--AY
521330 BRIDGES/ REPLACEMENT
CONG DIST. 1
ROW 1993 UNDERWAY
PROJECT MILEAGE : ,93
CONST 1994
$ 9057
MANAGER: N. PASSMORE
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 7246
FEDERAL HIGHWAY ADMIN FUNDS
GA, SHARE$ 1811
0TH SHARE$
GLYNN 521350
SR 520/US 17 FM I-95 TO JEKYLL ISLAND CAUSEWAY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES, PROJECT MILEAGE : 4.50 MANAGER: PETE BLOCKER
BRUNSWICK TIP f BATS93-03 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 521355 IS AN ASSOCIATED PROJECT,
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1994
$ 4325
FED SHARE$ 3460
GA. SHARE$ 865
0TH SHARE.$
GLYNN 521355
SR 520/US 17@ FANCY BLUFF CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : ,03 MANAGER: PETE BLOCKER
BRUNSWICK TIP f BATS93-04
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521350 IS AN ASSOCIATED PROJECT.
PE 1991 UNDERWAY
ROW NONE $
0
CONST 1994
$ 2100
FED SHARE$ 1680
GA. SHARE$
420
0TH SHARE$
GLYNN 522040
SR 25/BRUNSWICK-ROADWAY & APPROACH WORK TO SIDNEY LANIER BR
BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : 2.00
MANAGER: J. GRAYBEAL
r_
BRUNSWICK TIP f BATS93-0l CONG DIST. 1
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1995 $ 100
CONST 1996 $ 40000
FED SHARE$ 20000
GA, SHARE$
0TH SHARE$ 20000
GLYNN 522045
SR 25/BRUNSWICK MAIN SPAN OF HIGH LEVEL SIDNEY LANIER BRIDGE
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: UNKNOWN
BRUNSWICK TIP f BATS93-01 CONG DIST. 1
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA, SHARE$
0TH SHARE$
0 0 52000 26000
26000
GLYNN 522310
SR 27@ I-95 FM W/CRISPEN BLVD/CR 589 TOW/YELLOW BLUFF CRK RECONSTRUCTION & WIDENING FROM 5 LANES TO 6 LANES. PROJECT MILEAGE : .87 MANAGER: BILL MOSKAL
BRUNSWICK TIP f BATS93-02 CONG DIST. 1 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$ 2781
FED SHARE$ 2225
GA. SHARE$
556
0TH SHARE$
GLYNN 522730
SR 25 AT TALMADGE AVENUE IN BRUNSWICK INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANE'S: 0
MANAGER:
BRUNSWICK TIP. f BATS94-08 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1995
$
173
FED SHARE$
17.3
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 174
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
F.ISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GLYNN BAY ST/FIRST AVE FM NEW CASTLE-w BY NW TO PRINCE ST
BRUNSWICK TIP I BATS93-28
PE 1993 UNDERWAY
550450 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIS.T . .1
ROW LOCL
PROJECT MILEAGE : 40
CONST
AFTER 96
MANAGER: BILL MOSKAL
FOND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY AI>MIN FUNDS
GLYNN CR 141/F.OURTH ST FM ALTAMA AVE/CR 590 NE TO SR 25
550520 RECONSTRUCTION, & WIDENING FROM 2 LANES TO 4 LANES.
r.
PROJECT MILEAGE : 1.15
MANAGER: D. CHURCH (M)
BRUNSWICK TIP I BATS93-19
CONG DIS,T. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADM.IN FUNDS
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
GLYNN 570840
HISTORIC WATERFRONT MISCELLANEOUS IMPROVEMENTS / ENHANCEMENT PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROP,OSED LANES: 0
MANAGER: KEITH GOLDEN ..
GLYNN 57096X
BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT IS/CHATHAM
BRIDGE'PAINTING / MAINTENANCE
.
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
BRUNSWICK TIP I BATS94-14
CONG DI~T. 1 fUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN ~qNDS
CONG D_IST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL..HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONSTl995
$
813
FED SHARE$
650
GA. SHARE$
0TH SHARE$
163
PE NONE $
0
ROW NONE
$
0
CONST 1994 $
0
FED SHARE$
:GA. SHARE $
0TH SHARE$
r
... ,, ,_.
~ ~ ~ ~ ~ ~~ ~'.'.!~ ~~ r~ .;,= t!!.~~!i5't?.tli ~ Ii~~ lt::!'.:X~ r~,:6; ~-,.-:.
'-
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 175
COUNTY P, I.NO,
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL_ YEAR
COST ESTS
GORDON COUNTY OPERATED PUBLIC TRANSIT SERVICE
-----------------------------------------
681359 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 9
FUNDS RECIPIENT: GORDON MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
OPERATING 1994 $
56
FED SHARE$
32
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
23
GORDON 681359
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GORDON MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
56
FUND SOURCE: RURAL TRANSIT
FED SHARE$
32
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
24
GORDON 681360
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GORDON MANAGER: STEVE KISH
GORDON 6C2359
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GORDON
MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1996 $
59
FUND SOURCE: RURAL TRANSIT
FED SHARE$
34
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
25
I.
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT
CAPITAL 1994
$
20
FED SHARE$
u
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
CORDON 6C2360
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GORDON MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1996
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
GORDON 610550
SR 53 OVER I-75 TURN LANES/ TRAFFIC PROJECT MILEAGE : .19 - EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: H GANNAWAY
GORDON 610750
I-75@ SR 156 IN CALHOUN INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE: ,30 - EXIST, LANES: 3 /PROPOSED LANES: 5
MANAGER: H GANNAWAY (HI
CONG DIST. 9 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY ROW 1994 $ 120 CONST 1995 $ 2291
FED SHARE $ 2062
GA. SHARE $ 229 0TH SHARE $
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1996 $ 3299
FED SHARE $ 2969
GA. SHARE $ 330
0TH SHARE $
r.r.nr,r.J/\ f1F.P/\RTMF:tlT OF" Tll/\llSNlRT/\TJON
ST/\TE TRNISPORTATlON IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 176
COUNTY P.1.NO.
DESCRIPTION PROJECT DATA
CORDON I-75 @ SR 225 N OF CALHOUN
FISCAL
COST
- ---------------C-O-H--H-E-N-T-S--------------------------P-Y!-E-A1-R9-9-2---.-.-U-N!S-DT-ER-SWAY
'10755 INTERCHANGE / RECST. OR REHAB.
CONG.DIST, 9
ROW 1995
$
20
PROJECT MILEAGE : ,50 - EXIST. LANES: 6 /PROPOSED LANES: 6
-CONST 1996 $ ,1793
MANAGER: AAY METTS.
FUND SOURCE: I-STATE HAINT.
. FED SHARE $ 1605
FEDERAL HIGHWAY ADMIN FUNDS
GA. SR.AR$ 179
0TH SHARE$
CORDON 610920
I-75 UPGRADE REST AP.EA 134 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE I ,00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER!
CONG DIST. 9 ..
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS
P! 1994
$
29
RO'lf NONE $
0
CONST 1995
$
953
FED SR.AR$ 959
GA. SHARE$
95
0TH SHARE$
CORDON 610930
I-75 INTERCHANGE AT SR 136 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : ,00 - EXIST. LANES: 6 /PROPOSED LANES: 6 MANAGER: N PASSMORE (HI
CONG DIST, 9-
FUND SOURCE: I-STATE HAINT, FEDERAL HIGHNAY ADHIN FUNDS
PE 1996 ROW CONST
$
16
AFTER 96
AFTER 96
CORDON 620790
SR 3/US 41 FH S OF SR 156 N TO CALHOUN BYP IN CALHOUN RECONSTRUCTION I WIDENING FROM 2 LANES TO 4 LANES. P,ROJECT HI LEAGE I 1. 43
MANAGER! MGANNAWAY (HI
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHNAY ADHIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 4594 AFTER 96
GORDON 621365
SR 3/US 41/CALHOUN FH S OF AIRPORT TO SR 53/INCL BR Clf'T EXT ltECONSTRUCTION I NIDENINO FROH,2 LANES TO 4 LANES. PROJECT MILEAGE: 1.60 MANAGER! M GANNAWAY (HI
GORDON 621510
SR 53@ CSX RR/FAIRMOUNT
REPLACEMENT or THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
PROJECT MILEAGE : , . 20
MANAGER: BILL MCVEY
GORDON 621540
SR 53 "8 HP 14.67-15.8;EB HP 15.84-16,69;EB HP 18,1-19.37
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.25 MANAGER: BILL MCVEY (HI
CONG DIST, 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL1 H1GHWAY ADHIN FUNDS
CONG DIST, 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 621545 IS AN ASSOCIATED PROJECT._
PE 19~2 _UNDERWAY..
RO" NONE $
0
CONST 1995 $ 36!>3
FED SHARE $ 2954
GA. SHARE $ 739
0TH SHARE $
P! 1993 UNDERWAY
RO"l994
$
186
CONST 1995 $ 1120
. FED' SHARE $ 896
GA. SHARE $ 224
0TH SHARE $
PE 1992 ROW 1995 CONST
UNDERWAY
$
95
AFTER 96
.. ,, .
~~
~
~ ~
- , t='ll!
~
ei~!~i:,
t=&t~
~
li;:?~~t~
~
!;;fil:l=
i!1!::~
~:::~:H1J,. e~~
1::i:.:rt~
~~
ri.: : ,.J
t,:,:::.:-~..~~
,,:...-........ -.
I 'I
GEORGIA OEPARTHENT or TRANSPORTATION
STATE TRANSPORTATION IHPROVEHENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 177
COUNTY
OESCRIPTION
FISCAL
COST
P,l,NO,
PROJECT OATA
COMMENTS
YEAR
ESTS
G-O-R-!-)O-N----S-R---5-3-@---P-IN-E---LO-G---C-R-E-EK------------------------------------------------------------------------------------P-E--1-9-9-2-----U-N-O-ER-W--AY
621545 REHABILITATION or THE EXISTING BRIOGE(SI, NO ADOEO LANES.
CONG OIST, 9
ROW NONE $
o
PROJECT MILEAGE : ,26
.
CONST
AFTER 96
MANAGER: BILL MCVEY (H)
FUNO SOURCE: BRIOGE PROGRAM
FEOERAL HIGHWAY ADHIN FUNOS
621540 IS AN ASSOCIATED PROJECT.
GOROON 621620
SR 53/CALHOUN FH WC BRYANT PKWY/CS 814 EAST TO SR 3/US 41
TURN(LANES / TRAFFIC
.
PROJECT MILEAGE : .68 - EXIST. LANES: 4 /PROPOSEO LANES: 5
MANAGER1 RAY METTS (HI
CONG DIST, 9
FUND SOURCE: HWY. SAFETY FEOERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
CORDON 621630
SR 225 AT 4 LOCATIONS IN GOR!)ON, HURRAY COUNTIES
ADDITION or A PASSING LANE.
PROJECT MILEAGE: 5.96
MANAGER: BILL MCVEY (HI
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
CORDON 631225
CR 373/DEWS POND RD FH CR 481/CASR RO TO SR 53 MINOR WIOEN, RESURP' / RECST. OR REHAB. PROJECT MILEAGE I 3.04 - EXIST, LANES: 2 /PROPOSED LANES: 2
MANAGER: BILL MCVEY
GOR!)ON 631290
SR 136 EB HP 10-11.3; WB HP 12.3-13.6 EAST OF RESACA
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.60 MANAGER: BILL MCVEY (HI
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNOS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY. ROW LOCL CONST 1996 $ 1727
FED SRARE $ 1382 GA. SHARE$ 345 0TH SHARE $'
PE 1996 ROW CONST
$
50
AFTER 96.
AFTER gg.
GORDON 631370
SR 136 CONN, EB HP 4.5 TO HP 5.8; WB HP 6.55 TO HP 7.55
ADDITION OF A PASSING LANE, PROJECT MILEAGE : 2.30 MANAGER:
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADHIN FUNDS
PE 1995 ROW CONST
$
33
AFTER 96
AFTER 96
GORDON 650420
HILLHOUSE ST EXT/CALHOUN@ CSX RR-OR-HICKS ST EXT@ CSX RR
BRIOGES / RECST. OR REHAB. PROJECT MILEAGE : .75 MANAGER: H GANNAWAY (HI
CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
PE 1996 ROW NONE CONST
$
16
$
0
AFTER 96
r.F:OPGJ/\ OF:P/\RTHF:tlT or TRJ\N~PORT/\TJQN
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJl':CT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 178
COUNTY
DESCRIPTION
FISCAL
COST
C-1O~7R0:D7~O3N0:~~CR:RE-P-L4-A7-C3-E/-FM-AE-IN-RT-V-Io-E-rW-PR-T-HOR-EDJE-@C-E-TX-LI-SOIC-TA-RITN-A-GC-R-BE-ER-~-IO--G-E-S-(-S-)-. -N-O--A-O-O-E-O---L-A-N-E-S-.-----------C-O-N-G--D-CI-OS-MT-M.--E9N-T-S--------------------------RO-PW-EY-E-AL1-RO9-C9-L3-----U-NE-DS-ETR-SW--AY
PROJECT MILEAGE : .16
CONST 1995 $
n
MANAGER! BILL MCVEY
FUND SOURCE: BRIOGE PROGRAM FEOERAL HIGHWAY AOMIN FUNDS
FED SHARE$ GA. SHARE$
7u 8
0TH SHARE$
l'.
l!I ,,
I I
..
4
~
~
~
~ ..
~
!131~
lf~ilj~
m~.i:[;!ij_
-~
Pl.~['~'~
~
tt:tie$:i
~
iri'.-:;--::::
..
GF.ORGIA DEPARTMENT or TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 179
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO,
PROJECT DATA
G-R-A-D-Y-----S-R---11-2--S-B--H-P---2-. 3---TO---3-. -3-: --N-B--H-P--1-0-,-3--T-O--1-1-.-3---------------------------
COMMENTS
- -------------
-
YEAR .
l!:STS
----------------------------
PE 1992 UNDER"AY
421940 ADDITION or A PASSING LANE.
CONG DIST. 2
ROW 1993 ONDER"AY
PROJECT MILEAGE: 2.00
CONST 1994 $ 697
MANAGER: J. LINDSEY
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 558
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 139
OTB SHARE $
GRADY 422180
SR 111@ sorKEE CM N/CR 81 UPLACEHENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE: .17 MANAGER: J. LINDSEY
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 lJNDER"AY
ROW 1994 $
1
CONST 1995 $ 531
FED SHARE $ 425
GA. SHARE $ 106
OTB SHARE $
GRADY 431330
SR 111 OVER TURKEY CREEK REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES. PROJECT MILEAGE: .00
MANAGER:
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
Pl!! 1994
$
10
ROW 1994 $
1
CONST 1996 $ 391
FED SHARE$ 313
GA, SHARE$
78
0TH SHARE$
GRADY 442550
SR 189 OVER NEST BRANCH BARNETTS CREEK REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 ROW 1996 CONST
$
10
$
1
AFTER 96
CRADY 442552
SR 189 OVER BARNETTS CREEK/THOMAS REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 ROW 1996
CONST
$
10
$
1
AFTER gg
C.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
r.F:OIH-:IT\ l'f.r/\PTMF:NT Of" TRJ\tlSrORTJ\TION STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY.1996
COMMENTS
GREENE 2B1119
COUNTY OPERATED PUBLIC TRANSIT .SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GREENE HANAGERI STEVE KISH
CONG DIST, 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
GREENE 281119
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GREENE MANAGER: STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AD~IN FUNDS
GREENE 281120
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GREENE MANAGER! STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN.FUNDS
GREENE 2C211B
TWO STANDARD VANS AND 1190 MOBILE RADIOS TRANSIT FACILITil'!S / CAPITAL FUNDS RECIPIENT: GREENE
MANAGER! STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL-TRANSIT ADMIN FUNDS
GREENE 2C2119
ONE CONV. VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GREENE MANAGER! STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
16-Sep-1993 Page 180
FISCAL YEAR
COST ESTS
.
OPERATING 1994 $
79
FED SHARE$
45
GA. SHARE$
0TH SHARE$
]]
OPERATING 1995 $ Bl
FED SHARE$
47
GA. SHARE$
OTR SHARE$
]4
OPERATING 1996 $
96
FED SHARE$
50
GA. SHARE$
0TH SHARE$
36
CAPITAL 1994
$
42
FED SHARE$
34
GA; SHARE$
4
OTR SHARE$
4
CAPITAL 1995
$ 54
FED SHARE$
43
GA . SHARE $
6
OTR SHARE$
5
GREENE 210690
1-20 AT SR 44 INTERCHANGE LIGHTING./ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. I 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
5
ROW NONE $
0
CONST 1994 $ 210
FED SRA.RE$ 169
GA. SHARE$.
42
0TH SHARE$
GREENE 221360
SR 12/GREENSBORO FM WALNUT ST TOE OF EAST GREY.NE ST RECONSTRUCTION, WIDENING FROM 2 LANES TO 3 LANES. PROJECT MILEAGE : .39 HANA.GER: D. GRIFFITH
CONG DIST. 11 .
FUND SOURCE: HWY. SAFE~Y FEDERAL HIGHWAY ADMIN FUNDS 221610 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1994
$
40
CONST 1995 $ 500
FED SHARE$ 450
GA. SHARE$
50
0TH SHARE$
!.c,
.. rt 11.
~ ==
=~= ~ ~ ~ ~~ e1f1~ ~
~;.(:)~~ e'.!".~ !65,~~ ~~ rr."'--:"i;/
~
..
'
GEORGIA OEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 181
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY P. I .NO,
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL YEAR
COST ESTS
G--R-EE-N-E----S-R---12-/-G-R-E-E-N-S-B-O-R-O---FM-- E.-O-F--E-A-S-T--G-R-E-E-N-E--S-T--T-O--E-B--P-A-S-S-I-N-G---LA-N-E------------------------------------------------P-E--1-9-9-2-----O-N-D-ER-W--AY
221610 TURN LANES/ TRAFFIC
CONG DIST, 11
ROW 1994 $
87
PROJECT MILEAGE : 1.10 - EXIST, LANES: 2 /PROPOSED LANES: 3
CONST 1995 $ 937
MANAGER! D, GRIFFITH
FUND SOURCE: RWY, SAFETY
FED SHARE $ 843
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE $
94
221360 IS AN ASSOCIATED PROJECT.
0TH SHARE $
GREENE 2218U
SR 44 FM SR 16/PUTNAM TO HP 2.89/GREENE ... SEE PUTNAM CO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 221840 IS AN ASSOCIATED PROJECT,
PE 1992 ROW CONST
UNDERWAY, AFTER 96
AFTER 96
GREENE 270680
CR 38 8 RICHLAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .10 MANAGER: D, GRIFFITH
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1991 ONDERWAY
ROW LOCL
CONST 1996 $ 156
FED SHARE$ 125
GA. SHARE$
31
0TH SHARE$
GREENE 270681
CR 66/LESLIE MILL RD@ BEAVERDAM CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : ,25MANAGER: D. GRIFFITH
I.
GREENE 270870
CULVERT EXT@ VAR LOC ON STATE ROUTES.,OGLET/TALIF
BRIDGES/ MAINTENANCE PROJECT MILEAGE: ,00 MANAGER: L. SEABROO~
CONG DIST. 11 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST, 2 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 27087X IS AN ASSOCIATED PROJECT.
Pl!! 1992 UNDERWAY
ROW LOCL
CONST 1996 $ 196
FED SHARE$ 157
GA. SHARE$
39
0TH SHARE$
PE NONE $
0
ROW NONE $
O
CONST 1994 $ 211
FED SHARE$ 169
GA. SHARE $
42
0TH SHARE$
Gr.ORr.IA or.rARTMENT Or TRJ\NSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 182
COUNTY
DESCRIPTION
P.t.NO,
PROJECT DATA
COMMENTS
<-:-W-I-N-N-ET-T--C--A-P-IT-A-L--F-O-R--G--W-I-N-N-E-T-T--C-O-U-N-T-Y--V-A-N-P-O-O-L--P-R-O-J-E-C-T----------------------------------------------------------
FISCAL YEAR
COST ESTS
1D7034 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 4 , 10
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
CAPITAL 1994
$
96
FED SHARE $
77
FEDERAL TRANSIT ADHIN FUNDS
GA, SHARE$
9
0TH SHARE$
10
<:WINNETT VANPOOL SERVICE FOR GWINNETT COUNTY 1D7035 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER! STEVE KISH
CONG DIST, 4 , 10
F_UNO SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADHIN FUNDS
OPERATING 1994
$
100
FED SHARE$
50
GA. SHARE$
0TH SHARE$
50
GWINNETT CAPITAL FOR GWINNETT COUNTY VANPOOL PROJECT 107036 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH
CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADHIN FUNDS
CAPITAL 1.995
$ 192
FED SHARE$ 154
GA. SHARE$
19
0TH SHARE$
19
<:WINNETT CAPITAL FOR VANPOOL PROJECT 1D7037 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER! STEVE .KISH -
CONG DIST, 4 , 10
FUND SOURCE:.URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ 100
FED SHARE$
50
GA. SHARE$
0TH SHARE$
50
GWINNETT CAPITAL FOR COORDINATED E ' R SERVICES FOR GWINNETT COUNTY 1D7038 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH
CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADHIN FUNDS
CAPITAL 1995
$ 703
FED SHARE$ 562
GA. SHME $
71
0TH SHARE$
70
GWINNETT COORDINATED E, H SERVICES FOR GWINNETT COUNTY
107039 TRANSIT PROJECTS/ OPERATIONS
t
FUNDS RECIPIENT: GWINNETT COUNTY
MANAGER: STEVE KISH
CONG DIST. 4 , 10
FUND.SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADHIN FUNDS
OPERATING 1995 $ 348 FED SHME $ 174 GA. SHARE$ 0TH SHARE$ 174
GWINNETT CAPITAL FOR GWINNETT COUNTY VANPOOL PROJECT
1D7040 TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: GWINNETT COUNTY MANAGER! STEVE KISH
CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADHIN FUNDS
CAPITAL 1996
$ 288
FED SHARE$ 230
GA. SHARE.$
29
0TH SHARE.$
29
.
<a
~
~
~
~,,
~
~
~j!
X~~~~
&ji,;:(t,~
~
,~-;_;i~~
~li:13
~
Ii-:,~~;-~
r:.:>;;
!. ~ ..:
.. ::'-
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GWINNETT VANPOOL SERVICE FOR GWINNETT
1D70tl TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH
GEORGIA DEPARTMENT or TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 183
COMMENTS
FISCAL .
COST
YEAR
!STS
--------------------------------------
CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
100
FED SHARE$
!50
GA. SHARE$
0TH SHARE$
!50
GWINNETT CAPITAL FOR COORDINATED E, R SERVICES FOR GWINNETT COUNTY 1D70t2 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISR
CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$ 607
FED SHARE$
486
GA. SRARE $
60
OTR SHARE$
61
GWINNETT COORDINATED E, R SERVICES FOR GWINNETT COUNTY 1D70t3 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH
CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996 $ 3f8 FED SHARE$ lH GA. SHARE$
0TH SHARE$ lH
GWINNETT CAPITAL FOR COORDINATED E, R SERVICES FOR GWINNETT COUNTY 1D7lt6 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH
CONG DIST. 4 C 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1994.
$ 138
FED SHARI!!$ 110
GA. SRARE $
14
OTR SHARE$
14
GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1V1028 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY
MANAGER: STEVE KISH
CONG DIST. 4 , 10
CAPITAL 1994
$
n
FUND SOURCE: ELDERLY, DISABLED FUND FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$ GA. SHARE $ 0TH SHARE$
33 4
GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1V1029 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH
GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1V1030 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH
CONG DIST. 4 g 10
CAPITAL 1995
$
t2
FUND SOURCE: ELDERLY g DISABLED FUND FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$ GA. SHARE$ 0TH SHARE$
34
CONG DIST. 4 g 10
CAPITAL 1996
$
44
FUND soURCE: ELDERLY' DISABLED FUND FED SHARE$
35
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$ 0TH SHARE$
5
I.
r.i::npr. J T\ l>F:PTIRTMENT OF TPJ\NSPOl"ITTITIOtl STTITF. TR/\NSPORTTITIO: IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 184
COUNTY
DESCIUPTION
FISCAL
COST
P.I.NO,
PROJECT DATA
COMMENTS
YEAR
. ESTS
CW--IN-N--ET-T---I--8-5--F-H---S-, --SR---3-1-6--T-O--O-L-D--P.E-A-C-H-T-R-E-E--R-D--I-N-C-L--C-D--S-Y--S-T-E-M--:,-1-1Y--2-3-0------A-T-LA-N--TA---T-IP---I--G-W--R---7-2-------------------p-g--1-9-8-8-----U-N-O-ER-W--AY
110230 INTERCHANGE/ RECST, OR REHAB,
CONG DIST. 6
ROW 1989 UNDERWAY
PROJECT MILEAGE: 2,82 - EXIST, LANES: 2 /PROPOSED LANES: 4
CONST
AFTER 96
MANAGER: J. GRAYBEAL(CH)
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
CWINNETT I-985@ SR 20 (SR 20 TO 3 LANES)
110330 INTERCHANGE/ RECST, OR REHAB. PROJECT MILEAGE : .39 - EXIST, LANES: 2 /PROPOSED LANES: 4
MANAGER: R. ASHHORE(M)
ATLANTA TIP I GW-R 69
CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CWINNETT I-85 8 SR 20/LAKRENCEVILLE HIGHWAY
110360 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.52 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER! H. ASHMORE
ATLANTA TIP IR 68
CONG DIST. 10, 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CWINNETT I-85 rH I-285 TO I-985 .. ,SEE DEKALB
110410 LANDSCAPING/ ENHANCEMENT
PROJECT MILEAGE : 17.62 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E. LAWS
.
ATLANTA TIP I GW-R 136
CONG DIST. 4 , 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
PE 1993 UNOERWAY
ROW 1994 $ 1548 CONST 1995 $ 9177
FED SHARE $ 8259
GA. SHARE $ 918
0TH SHA.RE $
. PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
CWINNETT I-85 SIGN HOD rH DEK CL TO SC STATE LN,,JACK/BANKS/BAR/FRANK
110440 SIGNINO / MAINTENANCE PROJECT MILEAGE: 76,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
HANAGERI L, SEABROOK
GWINNETT I-85 FM SR 316 TO OLD PEACHTREE INCL CD-IH FUNDS: SEE 110230
11Y230
INTERCHANGE/ RECST, OR REHAB. PROJECT MILEAGE : ,00 - EXIST, LANES: 2 /PROPOSED LANES: 4
MANAGER: UNKNOWN
CONG DIST. 10, 6
FUND SOURCE: I-STATE MAINT, FEDERAL HIGHWAY ADHIN FUNDS 11044W IS AN ASSOCIATED PROJECT,
ATLANTA TIP I GW-R 72
CONG DIST. 6.
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 144
FED SHARE$ lU
GA. SHARE$
0TH SHARE$
PE NONE ROW 1989 CONST .
$
0
UNDERWAY
AFTER 96
GWINNETT SR 20 ON EXT LOC FM I-85 FOR 0.5 MI:NEN LOC TO EXIST 4-LN 120680 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.10 MANAGER: H. ASHMORE(H)
ATLANTA TIP I GW 14
CONG_ DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993. ROW CONST
UNDERWAY AFTER 96 AFTER 96
..
.,
..
~
~
~
~
~ ~
~
=e=;;,
~!t!t#l
~
~~
-=;g
~ ~
~ .,.
I''"""'""'
1::,:. ,;_;;
:-:.:.""::-" .....
---..
..
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 185
COUNTY P.I.NO,
DESCRIPTION PROJECT DATA
GWINNETT SR 10/STONE MTN FWY FM ROCP::BRIOGE RO TO E/HEWATT RO
FISCAL .
COST
COMMENTS
YEAR
ESTS
ATLANTA TIP f G'-lf--12-4---------------------PE---1-9-9-3-----U-N-DE-R-W--AY
121490 RECONSTRUCTION, WIDENING FROM 6 LANES TO 8 LANES.
CONG DIST. 4
ROW 1994 $ 6500
PROJECT MILEAGE : 3.20
CONST 1996 $ 12553
MANAGER: BILL MOS!tAL
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$ 10042
FEDERAL RIGRWAY ADMIN FUNDS
GA. SHARE$ 2511
0TH SRAP.P! $
r
GWINNETT P'TREE IND BLVD FM RODGERS BRIDGE RD TO SR 20/SUGM HILL 121673 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PRO.iECT MILEAGE : 7.90 MANAGER: H. ASHMORE
ATLANTA TIP f GW 72 CONG DIST, 6 & 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
GWINNETT P'TREE IND BLVE FM SR 20/SUGM RILL NE TO RELOC SR 347/HALL 121676 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.50 MANAGER: H. ASHMORE
GWINNETT SR 120 FM MCP::ENDREE CHURCH RD TO SR 316 121680 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : ,99 MANAGER: RAY METTS
GWINNETT SR 120 FM I-85 TO Mcl'::ENDREE CHRUCH RD (EXCEPTION CT 11 121682 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECTHILEAGE: 3.03 MANAGER: RAY HETTS (M)
ATLANTA TIP f GW 100 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f GW 88 CONG DIST. 4 & 6 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f GW 88 CONG DIST. 4 & 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1995 $ 7500 FED SHARE$ 6000 GA. SltARE $ 1500 OTR SltARE $
PE 1992 UNDERWAY
ROW 1993 UNDERWAY CONST 1994 $ 2349
FED SHARE$ 1879 GA, SHARE$ 470 0TH SRAP.P! $,
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
GWINNETT SR 20/LOGANVILLE HWY FM OZORA RD NORTH TO PLANTATION BLVD 121710 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.90 MANAGER: H. ASHMORE(M)
ATLANTA TIP f GW 74 CONG DIST, 10, 4
FUND SOURCE:'suRFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
GWINNETT SR 124 FM CENTERVILLE-ROSEBUD RD TO HENRY CLOWER BLVD 121720 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.90 MANAGER: AAY METTS (C/M)
ATLANTA TIP t G'lf 76
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 5166 AFTER 96
GEOR~lh OEPhRTHENT OF TRAN~PORTATJON STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 186
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO,
PROJECT DATA
COMMENTS
YEAR
.. ESTS
G--W-IN-N--ET-T--S-R---31-6--A-T--S-U-G-A--R-LO--A-F--PA--R-IC-W-A--Y-/A-T-R-J-N-SO--N--R-O-A-D--(-M-L--2-.-4-5-)---------------A-T-L-A-N-T-A--T-I-P--I--G-W---R--1-0-1------------------P-E--1-9-9-3-----O-N-D-ER-W--AT
122490 INTERCHANGE/ RECST, OR REHAB.
CONG DIST. 4
ROW 1994 $ 2006
PROJECT MILEAGE : ,25 - EXIST, LANES: 2 /PROPOSED LANES: 4
CONST 1996 $ 3228
MANAGER! J, GRAYBEAL
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$ 2582
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 646
OTR SHARE$
GWINNETT SR 10/STONE MTN FWY FM EAST or HEWATT RD TO EAST OF SR 124
122520 RECONSTRUCTION, WIDENING FROM 6 LANES TO 8 LANES. PROJECT MILEAGE : 3.25
MANAGER! BILL HOSAAL
ATLANTA TIP I GW 57
CONG DIST, 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
UNDERWAY $ 9035 AFTER H
GWINNETT SR 316@ SR 20 122530 TURN LANES/ TR.Al'FIC
PROJECT MILEAGE: ,36 - EXIST. LANES! 0 /PROPOSED LANES: 0
MANAGERI
GWINNETT PARTIAL R/W FOR 121490
I.
12Y490 UNKNOWN/ RECST. OR REHAB.
PROJECT MILEAGE : ,00 - EXIST, LANES1 0 /PROPOSED LANES: 0
MANAGER! .
ATLANTA TIP I GW 132
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDER.AL HIGHWAY ADMIN FUNDS
ATLANTA TIP I G1f 124
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1996 $ 223
FED SHARE$ 223
GA. SHARE$
0TH SHARE$
PE NONE ROW 1995 CONST NONE
$
0
$. 13500
$
0
GWINNETT SR 20 8 DAVIS/SIMONTON ROADS 132300 TURN LANES/ TRAFFIC .
PROJECT MILEAGE: .16 - EXIST. LANES1 5 /PROPOSED LANES: 5 MANAGER: L. OWENS
GWINNETT SR 20@ SR 324 132310 TURN LANES/ TRAFFIC
PROJECT MILEAGE : ,26 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: L. OWENS
GWINNETT SR 13/BUFORD HIGHWAY@ GEORGE PIERCE PAAR 132 320 TURN LANES/ TRAFFIC
PROJECT MILEAGE : ,15 - EXIST, LANES: 2 /PROPOSED LANES: 3 MANAGER: L. OWENS
ATLANTA TIP I G1f 127
CONG DIST. 4 FUND-SOURCE: HNY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I GW 128
CONG DIST. 10 . FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I G1f 129 CONG DIST, 6 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1994 $
85
FED SHAH$
77
GA. SHARE$
9
0TH SHARE$
PE NONE $
0
ROW LOCL
CONST 1994 $ 150
FED SHARE$ 135
GA. SHARE$
15
0TH SHARE$
PE NONE $
0
ROW LOCL
CONST 1994 $ 187
FED SHA.RE$ 168
GA. SHARE$
19
0TH SHARE$
,. ..
- ..
~
~
== ~ ~ ~Ji!~
~ffiti1fi
~
='i-?J
-=
ier~:et1 ~~
~i,~~
~.ai-M
~,~:~;;::i
,:;-;-.;".~~~:
.
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY.1996
16-Sep-1993 Page 187
COUNTY P.I.NO.
DF.:SCRIPTION PROJECT DATA,
COMMENTS
FISCAL YEAR
COST ESTS
GWINNETT SR 13/BUFORD HWY FM OLD PEACHTREE RD TO SUGARLOAF PRWY------------A-T-LA-N--TA---T-I-P--f--GW---9-9---------------------P-E--1-9-9-6-----$------20
132360 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 6
ROW LOCL
PROJECT MILEAGE : 1,30 MANAGER: N, PASSMORE (M)
FUND SOURCE: SURFACE TRANSPORT.
CONST
AFTER 96
FEDERAL HIGHWAY J\DHIN FUNDS
/
GWINNETT SR 124 AT HOG MTN RD/ CR 203 141800 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE: ,00 - F.:XIST. LANES: 0 /PROPOSF.:D LANES: 0 MANAGER:
GWINNETT B. GWINNETT-GRAVES CONN FM OLD NORCROSS TO CRF.:SCENT DR
150190 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.70 MANAGER: J. GRAYBEAL(HJ
ATLANTA TIP f GW 131 CONG DIST. 10
FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ACHIN FUNDS
ATLANTA TIP I GW81/GW39
CONG DIST, 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ACHIN FUNDS
PE 1994 UNDERWAY
ROK 1994 $
10
CONST 1995 $ 262
FED SHARE $ 236
GA, SHARE $
26
OTR SHARE $
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
GWINNETT INDIAN TRAIL/LILBURN RD/CR 650 FM I-85 TO SRB/US 29 150250 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE: 3,24 MANAGER! D. SMITH (CJ
ATLANTA TIP I GW 109
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ACHIN FUNDS
PE 1993 ROW LOCL CONST
UNDERWAY
AFTER 96
GWINNETT RILLIAN RILL RD FM US 29 TO FIVE FORRS TRICRUM 150260 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : . 00 MANAGER: D, SMITH
ATLANTA TIP I GW 7
C_ONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ACHIN FUNDS
PE 1995 ROW LOCL CONST
$
20
AFTER 96
GWINNETT KILLIAN HILL RD FM FIVE FORKS TRICKUM TO US 78 150270 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .00 MANAGER: D. SMITH
ATLANTA TIP I GW 7
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ACHIN FUNDS
Pl!! 1995 ROW LOCL CONST
$
20
AFTER 96
GWINNETT FIVE FORKS TRICKUM FM KILLII\H HILL RD TO OAK RD 150280 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.47 MANAGER: D, SMITH
1.
ATLANTA TIP f GW 4 CO~G DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL H_IGHWAY ACHIN FUNDS
PE 1995 ROW LOCL CONST
$
.20
AFTER 96
r.r.n11,~rf\ flF:rflllTMF:tlT OF TP/\NSPORT!\T!Otl ST!\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 188
C-1P1C-7UO-0,INU-9.N-5NNT-0OYT-T-, -M-TPSR-RIAGO-AN-JNFAE-FGAC-IECT-LR-StM-S/IB-IGLUT-NE-RRAA-TAGL-FEDP-RFR-SIEIDCY-OS:D-SJCET-LR,EC0-EIMT-P0. -T-IDO-O-APN-TET-AIXM-I-SIZ-TA-,-T-ILO-AN-N-E-IS-N:--0G-1-'/IP-NR-NO-E-PTO-T-S-EC-DO-U-NL-TA-YN-E-S-:--0--------CFA-UOT-NNL-DAG-N-TDS-AOCI-OUS-MTTR-MCI.-PEE-4N:-TI-,CS-OG-WN6-G-1-M3-5-IT-.-/-A-I-R--Q-U-A-L------C-O-RN-OFPS-WEITFYS-EE.C-DAN11-ARO99-L9SN9-4HE5-A-R-.-E-$$$$-ZC-OS-TS-TS-435-0218050
FEDERAL HIGH1'AY AOMIN FUNDS
GA. SHARE$
54
0TH SHARE$ 156
G1'1NNETT HOV LN SIGNING ON 1-75, 1-85 HETRO AREA/CLAYTON;COBB1FULTON l1297X HOV LANES/ TRAFFIC
PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
ATLANTA TIP IR 73
CONG DIST. 6
PE 1994 $
0
R01' NONE $
0
CONST 1995 $
0
MANAGER: BURT RIDDLE
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$
712970 IS AN ASSOCIATED PROJECT.
0TH SHAAI!! $
G1ftNNETT SR 120 FP.M PAR~ BR P~1'Y TO PEACHTREE IND BLVD/SEE FULTON
72100X PRELIMINARY ENGINEERING/ NEW CONSTRUCTION
1
PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: NEIL DAVIS
ATLANTA TIP I RTP-FN 3 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 721000 IS ..AN ASSOCIATED PROJECT.
PE NONE ROW 1991 CONST
$
0
UNDERWAY
AF_TER _96
CWINNETT 72105X
SR 124 REHAB.
9
or
YELLOW RIVER/SEE DEICALB THE EXISTING BRIDGE(S).
COUNTY FROH
2
LANES
TO
4
LANES.
PROJECT MILEAGE: .03
MANAGERt RAY METTS
ATLANTA TIP I DK 99
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721055 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1995 CONST
UNDERWAY
$
0
.AFTER 96
GWINNETT SR 124 FH ROC~BRIDGE RD/DEICALB TO CENTERVILLE; SEE DEAALB 72153X RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES,
PROJECT MILEAGE: ,00 MANAGER: UNKNOWN
ATLANTA TIP I GW 76
CONG DIST, 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
0
AFTER 96
.. ""'
rt~
e:2;i~9
-~ == ==.i
~ ~
!)!~
~Y$
~~
t;'l::t~ ~
'
tf!<'.~.f!~
~~
!';.~:';':;:;,:.
t\-,':~
..
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 189
COUNTY
DESCRIPTION
FISCAL
COST
P, I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
RA--BE-R-S-H-A--C-O-U-N-T-Y---O-P-ER--A-T-E-D--P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------
1B1018 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE RISH
OPERATING 1994 $
47
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
OTB SHARE$
21
RABERSHA COUNTY OPERATED PUBLIC TRANSIT SERVICE 181019. TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE RISH
CONG DIST. 9
OPERATING 1995 $
49
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
23
RABERSHA COUNTY OPERATED PUBLIC TRANSIT SERVICE 181020 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE RISH
CONG DIST. 9
OPERATING 1996 $
52
FUND SOURCE: RURAL TRANSIT
FED SHARE$
28
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
24
RABERSHA ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RAD'ro
r
1C2018 TRANSIT FACILITIES/ CAPITAL
.
FUNDS RECIPIENT: HABERSHAM
MANAGER: STEVE RISH
CONG DIST. 9
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
HABERSRA ONE STANDARD VAN AND ONE MOBILE RADIO 1C2019 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE RISH
CONG DIST. 9
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADHIN FUNDS
GA. SHAAE $
2
OTB SHARE$
2
HABERSHA SR 17/115 FM NASHINGTON ST/SR 197 TO RIDGE ST/CS.550
122120 TURN LANES/ TRAFFIC PROJECT MILEAGE: .43 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS
CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994 $ 345
FED SHARE $ 311
GA. SHARE $
35
0TH SHARE $
HABERSHA SR 17 FR 3-LANE@ SUTTON HILL CR TO SR 115 122440 RECONSTRUCTION, WIDENING FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE : 1.00 MANAGER: L. OWENS (M)
CONG.DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW 1996 CONST
UNDERffAY $ 243 AFTER 96
q:nrr.111 flFT/IRTMF.IIT or TR/INSr<1RT/ITION ST/ITF. TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 190
COUNTY P.t.NO,
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL YEAR
COST ESTS
RASERSRA ANTIOCH RD/CR 117 FH SR 17 TO SR 17 ALT
----------------------------------P-E--1-9-9-2--- UNDERWAY
131080 RECONSTRUCTION, WIDENING, NO LANE ADDITION PROPOSED.
CONG .DIST, 9
ROW 1989 UNDERWAY
PROJECT MILEAGE : 4.00
CONST
AFTER 96
MANAGER: L, OWENS (H)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADHIN FUNDS
RABERSHA SR 105/US 441 B FH HAIN ST NW TO SR 365 (' 1-WAY PAIR) 132100 RECONSTRUCTION' WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE I 1.63 MANAGER: L. OWENS (H)
CONG DtST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW 1991 CONST
UNDERWAY UNDERWAY AFTER-96
RABERSHA CR 63/CHASE RD@ SOUTHERN RR
170498 REPLACEMENT or TRE EXISTING BRIDGES(S). FROH 1 TO 2 LANES.
PROJECT MILEAGE 1 ,18 MANAGERI L. OWENS
RABERSRA CR 97/WELCOHE ROHE CHURCH RD OVER SOUTHERN RR NE HT AIRY
170890 'REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .27
MANAGER: L, OWENS
RABERSHA CR 94/NANCY TOWN RD OVER SOUTHERN RR NE or HT AIRY 170891 REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .24
MANAGER: L. OWENS
CONG DtST, 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST, 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL-HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1991 UNDERWAY ROW LOCL
CONST 1994 $ 530 FED. SHARE$ 424
GA, SRARE $ 106 0TH SRARE $
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 462
FED SHARE$ 370
GA. SHARE$
92
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 404
FED SHARE$ 323
GA, SHARE$
81
0TH SHARE$
,.
C
~
~
= = ~ ~ ~ ~ !@~~!!!9 !!f!f:~ ~'.,,~ ~~ !fl!!r.:.~ ~ ~~$) t~~:.:::~~ A
-- ~ :~.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPI\RTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
RALL 1B102J
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RALL MANAGER! STEVE ~ISR
CONG DIST. 9
FUND SOURCE! RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
RALL 1B102.
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RALL MANAGER: STEVE ~ISR
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
RALL 1Bl025
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RALL MANAGER: STEVE ~ISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT .ADMIN FUNDS
RALL 1C202J
TWO STANDARD VANS AND TWO MOBILE RADIOS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HALL MANAGER: STEVE KISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT. FEDERAL TRANSIT ADMIN FUNDS
HALL 1C202.
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: RALL MANAGER: STEVE ~ISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
HALL lC2025
ONE STANDARD VAN AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: RALL MANAGER: STEVE KISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
RALL 110400
I-985 SPLIT DIAMOND INTERCHANGE@ SR 13, SR 53, CO SYSTEM
INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 3.10 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: RON BRAZIEL (M)
CONG. DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
c,,
16-Sep-1993 Page 191
FISCAL .. COST
YEAR .
ESTS
------------------
OPERATING 1994
$
175
FED SHARE$ 100
GA. SHARE$
0TH SHARE$
76
OPERATING 1995 $ 185
FED SHARE$ 105
GA. SHARE$
0TH SHARE$
80
OPERATING 1996 $ lH
FED SHARE$ 111
GA. SHARE$ 0TH SHARE$
B
CAPITAL 1994
$
412
FED SHARE$
J.
GA. SHARE$
4
0TH SHARE$
4
CAPITAL 1995
$
21
FED SRARE $
17
GA. SRARE $
2
0TH SHARE$
2
CAPITAL 1996
$
21
FED SHARE$
17
GA. SHARE$
2
0TH SHARE$
2
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
GF'.flllt~i II f\F:rllllTMF'.ti-t or TRI\N!;l"ORTI\Ttnll
STI\TE TRANSPORTATION lHPROVEHENTS PROGRJ\M PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 192
COUNTY
DESCRIPTION
P,I.NO,
PROJECT DATA
R-A--LL------S-R---5-3-C-O-N-N---FH---SR---S-J--T-O--"--B-Y-P-A-S-S-/-G-A-I-N-E-S-V-I-L-L-E----------.
FISCAL
COST
------------------C-O-M-M-E-N-T-S---------------------------P-EY-E-A1-R9-9--2~. ~-U-!NS-DT-ER-SW--AY
121590 UCONSTRUCTION I WIDENING FROM 2 LANES TO 4 LANES,
FONG DIST. 9
RO" 1992 UNDERWAY
PROJECT MILEAGE : ,80
.
CONST 1994 $ 144t
MANAGER! R, ASff:HOM
FUND SOURCE: NAT'L RIGR"AY
FED SHARE$ 115t
FEDERAL HIGH"AY ADHIN FUNDS
GA, SHARE$ 2tO
'
OTR SHARE$
HALL 121U0
SR 53/HCEVER RD FH MUNDY HILL RD NE TO SR 369 RECONSTRUCTION I "IDENINO FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2,50 MANAGER! L, OWENS
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FE~ERAL HIGHWAY ADHIN FUNDS
PE 1993 ONOERWAY
ROW 1993 ONOER"AY
CONST 1994
$ 61941
FED SHARE $ 4955
GA, SHARE $ 1239
0TH SHARE $
RALL 12U20
SR 53C REL/GAINESVILLE FH SR 53C/" BYP TO SR 13/SR 60
CONSTRUCTION or NE" ROUTE "ITH 4 LANES PROPOSED.
PROJECT MILEAGE: ,90
MANAGER: BILL MOSKAL
CONG DIST, 9
FUND SOURCE! NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ONOER"AY RO" 1992 UNOER"AY CONST 1994 $ 5429
FED SHARE $ 4343 GA. SHARE $ 1086 0TH SHARE $
HALL 12167X
P'TREE IND BLVD FH SR 20/SUGAR HILL TO SR 347/SEE GWINNETT
UNICNOWN / UNKNOWN
,
PROJECT MILEAGE : ,00 - EXIST. LANES! 0 /PROPOSED LANES: 0
MANAGER: R, ASHMORE
PE NONE $
0
CONG DIST, 9
RO" NONE $
0
CONST 1995 $
0
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
FEDERAL HIGHWAY ADHIN FUNDS
GA, SHARE$
121676 IS AN ASSOCIATED PROJECT.
0TH SHARE$
RALL 121780
SR 53/DA"SONVILLE RWY FH CR 248@ SARDIS E TO LARE RANCH CT RECONSTRUCTION 5 "IDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 1,80 MANAGER! K FULBRIGHT (H)
CONG DIST, 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW CONST,
UNDER"AY AFTER 96
AFTER 96
HALL 121810
SR 11/US 129 FH 0.4 HIS/SR 323 TO 0.3 HI S/CR 719 RECONSTRUCTION I "IDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 2,70 MANAGER: L. OWENS
HALL 122010
SR 369/BROWN'S BR RD FH FORSYTH CO LINE TO SR 53 RECONSTRUCTION, ."IDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 4.93 MANAGER: R. ASHMORE(HI
CONG DIST. 9 FUND SOURCE! NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 UNDER"AY ROW 1993 UNDERWAY
CONST 1995 $ 3249 FED SHARE $ 2599 GA. SHARE $ 650
0TH SHARE $
PE.1992 RO" CONST
UNDER"AY AFTER 96
AFTER 96
:~: : .
.
, ...... ,
11.11
~
9!fB
~
~
~
~
~~~
~
~
. tt,::;.i-):;~ ~
~
f.iit"'I~
(~-;;--.,.-.-.
........ ~,.-~.,-.-,
C)I
I:'-
GEORGIA OEPMTMENT OF TRANSPORTATION STAT.E TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep.:1993 Page 193
-------------------------- ---------------------------------------------------------------------------------------- COUNTY
P.I .NO.
DESCRIPTION PROJECT OATA
RALL 122020
SR 53 FH LANIER RACEWAY/RO ATLANTA TO I-985 RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.52 MANAGER: H. REYNOLDS (M)
COMMENTS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT.
FISCAL. YEM
PE 1992 ROW CONST
COST ESTS
UNDER,rAY AFTER 96 AFTER 96
FEDERAL HIGHWAY AOHIN FUNDS
RALL 122030
MCEVER RO FM S/CR 396 NE TO SR 53/HUNOY HILL RO
RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.20
MANAGER: R. ASHMORE(M)
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW LOCL CONST
ONOER,rAY AFTER 96
RALL 122060
SR 11/CLEVELANO HWY FM LIMESTONE RO TO NOPONE RD/, SIGNALS RECONSTRUCTION' WIDENING FROM 2 LANES ,TO 4 LANES. PROJECT MILEAGE : 5.13 MANAGER: RON BRAZIEL (H)
RALL 12206t
SR 11 @ CHATTAHOOCHEE RIVER RERAS. OF THE EXISTING BRIOGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .16 MANAGER: RON BRAZIEL (H)
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 122066 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW CONST
ONDER,rAy
AFTER 96 AFTER 96
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
HALL 122066
SR 11@ EAST FORK LITTLE RIVER RERAS. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .07 MANAGER: RON BRAZIEL (M)
RALL 12215X
SR 11/US 129 FH S4 332/JACKSON TO SR 323 ... SEE JACKSONCO
UNKNOWN_/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: TONY DUKE
HALL 122220
SR 11/CLEVELAND HWY FM NOPONE RO/CR 65 TO SR 284/, RIVER BR
RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
I
PROJECT MILEAGE : 5.93
MANAGER: RON BRAZIEL (M)
CONG OIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS 122060 IS AN ASSOCIATED PROJECT.
PE 1992 ROW NONE CONST
ONDER,rAY
$
0
AFTER 96
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS 122150 IS AN ASSOCIATED PROJECT.
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
CONG DIST, 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
I ;r:up,; I/\ r,r:r /\RTMf.llT OF TR/IJISf'ORT/\T !Otl
ST/\TE TR.AJISPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 194
R-CPA-OL-. UL-I.N-NT-OY--. -s-R---1-1/-U-S---1-2-9--FHDP-R-E-OSSR-CJE-RC-2I8-TP4-T/-ICDO-ALN-TE-AR-M-O--N--T-O--C-L-E-V-E-L-A-N-D--B-Y-P-/-W-H-I-T-E--C-O----------------C-O-M-M-E-N-T-S--------------------------PF-EIYS-EC-A1-AR9-L9-2---.-.-U-NEC-DSO-ETSR-STW--AY
122240 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST, 9_
ROW
AFTER 96
PROJECT MILEAGE : 7. 60
.
.
CONST
AFTER 96
MANAGER: RON BRAZIEL (H)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADHIN FUNDS
RALL 132020
SR 53/HUNOY HILL RO FH NEAR I-985 TO MCEVER RO RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.40 MANAGER1 L. OWENS
RALL 132200
SR 211 N/BARROW CO LINE@ MULBERRY RIVER
REPLACEMENT OF THE EXISTING BRIOGES(SI. NO ADDEO LANES,
PROJECT MILEAGE : ,20
.
MANAGER: L. OWENS
HALL 132230
SR 51 RELOC nt HAIN ST ALONG ATHENS ST/HOON OR TO SR 51 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED, PROJECT MILEAGE: ,21 MANAGER: L. OWENS
RALL 141840
SR 283 AT BRITT WHITMIRE ROAD RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE: .00
MANAGER: L. OWENS
RALL 150140
SR 13/PEACHTREE RO@ SOUTHERN RR
REPLACEMENT or THE EXISTING BRIOGES(SI. NO ADDEO LANES.
PROJECT MILEAGE: ,40
.
MANAGER: L. OWENS
HALL 150200
SR 53 FM SR 369/BROWNS BRIDGE RO TO SR 53 CONN RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 2.10 MANAGER: BILL MOSKAL
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEOERAL'HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: HWY. -SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1992 UNDERWAY CONST 1994 $ 3299
FED SHARE$ 2639 GA, SHARE$ 660
0TH SHARE$
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994 $ 930
FED SHARE$ 744
GA. SHARE$
186
0TH SHARE$
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994 $ 266
FED SHARE$ 213
GA. SHARE$
53
0TH SHARE$
PE 1994 $
10
ROW 1995 $
1
CONST 1996 $ 347
FED SHARE$ 312
GA. SHARE$
35
0TH SHARE$
PE 1985 UNDERWAY ROW 1987 UNDERWAY CONST 1996 $ 1160
FED SHARE$ 928 GA. SHARE$ 232 0TH SHARE$
PE 1993 RON 1995 CONST
UNDERWAY $ 1389 AFTER 96
r
'11
.r-
.. .c,
,
~
~
~
~
~
~~
~ .i:;~~
-<&!,;=
~ =-,1,.",;l
.. ~
Jm,!'{'cs'-c;;;,
~;.<\i~
~
~;;~;!i
~:'.::-<;-~~
:~. --~-~-
t,,, .. .
..... ,
...
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 195
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL . COST YEAR . ESTS
RALL SR 11-/-M-Y-R-T-L--E--ST---FM---S-R--1-1--T-O--E-X-I-S-T-IN--G--M-U-L--T-I--L-A-N-E-@---C-R--7-3-3-------------------------------------------------P-E--1-9-9-4-----$---- 44
150290 RECONSTRUCTION' WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 9
ROW
AFTER 96
PROJECT MILEAGE : .50
CONST
AFTER 96
MANAGER:~ FULBRIGHT (M)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
RALL 162430
FRIENDSHIP, THOMPSON MILL RO FM 1-985 TO SR 211/GWINNETT RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : 8.40 MANAGER: L. OWENS
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
. PE 1994 ROW LOCL
CONST
$
186
AFTER 96
RALL 170536
CR 928/WHITERALL RD@ NORTH OCONEE RIVER
REPLACEMENT or THE EXISTING BRIOGES(S). FROM 1 TO 2 LANES.
PROJECT MILEAGE : .03 MANAGER: L. OWENS
HALL 170730
I.ME LANIER ACCESS RO FM I-985/SR 365 TO SHORELANO OR/CR 592 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 2.10 MANAGER: ff. ASHMORE
RALL 170735
LA.KE LANIER ACCESS RD FM I-985 TO LA.KE (PH II - LANES 3 , 4) llECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 3.80 MANAGER: ff. ASHMORE
RALL 171030
CITY or GAINESVILLE-BIRE/PEOSTRIAN PATHS TO INTERCONNECT
BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
RALL 171060
RESTORE FLOWERY BRANCH RAILROAD DEPOT MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
6
ROW LOCL
CONST 1996 $
93
FED SHARE$
74
GA. SHARE $
19
0TH SHARE$
CONG DIST. 9
FUND SOURCE: I.ME ACCESS PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 17U730 IS AN ASSOCIATED PROJECT.
PE 1986 UNDERWAY
ROW 1987 UNDERWAY
CONST 1995 $ 1770
FED SHARE$ 1682
GA. SHARE$
89
OTA SHARE$
CONG DIST. 9
FUND SOURCE: LARE ACCESS PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $ ROW 1994 $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
85 2000 2916 2770
146
CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1996 $ 500
FED SHARE$ 400 GA. SHARE$ OTR SHARE-$ 100
CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW NONE CONST
$
0
AFTER 96
,:,=:,,p,: IT\ PF:rT\PTMF:tlT (lf" TPT\ll~ronT/\TJ()II
ST/IT TRAflSPORTATlON IMPROVEMENTS PROGAAH PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 196
COUNTY
D!l;SCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-R-A-L-L------PU--R-C-H-A-S-E--o-r--G-A-I-N-ESV--IL-L-E---D-E-P-O-T -----------------------------------------------------------------------P-E--N-Q-N-E-- -~$-------0
171090 MISCELLANEOUS IMPROVEMENTS/ NHANCEH!l;NT
CONG DIST. 9
ROW NONE $
0
PROJ!:CT MILEAGE: .00 - XIST. LANS: 0 /PROPOSED LANS: 0
CONST 1994 $ 295
HANAG!l;R:
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHNAY ADHIN FUNDS
FED SRARE $ 236 GA. SHARE$
0TH SHARE$
59
,.
"
.,;
'6.i
6.
~
~
~
iH
~
@~
-i.=
~
~
~
~
I!'>-""=
~
~
1,:;,~ . -
/:;_'.A;~~
COUNTY P. I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
HANCOCK 281123
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
HANCOCK 281124
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
0)
.,,
16-Sep-1993 Page 197
FISCAL
COST
YEAR
. ESTS
------------------
OPERATING 1994 $
53
FED SHARE$
31
GA. SHARE$
0TH SHARE$
22
OPERATING 1995 $
56
FED SHARE$
32
GA. SHARE$
0TH SHARE$
23
HANCOCK 281125
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1996 $
59
FUND SOURCE: RURAL TRANSIT
FED SHARE$
34
FEDERAL TRANSIT ADHIN FUNDS
.GA. SHARE$
0TH SHARE$
25
HANCOCK 2C2123
ONE STANDARD VAN AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1994
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
HANCOCK 2C2124
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH
r_
HANCOCK ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO 2C2125 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1995
$
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADHIN FUNDS
GA, SHARE$
4
0TH SHARE$
3
CONG DIST. 11
CAPITAL 1996
$
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
41
0TH SHARE$
3
HANCOCK 231310
SR 15 OVER COPELAND CREEK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES,
PROJECT MILEAGE : ,25 MANAGER: D, GRIFFITH
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 231330 IS AN ASSOCIATED PROJECT.
PE 1993 ROW 1996 CONST
UNDERWAY
$
6
AFTER 96
r.F,npr. I/\ OF:P/\PTMF.tlT OF TIU\.NSPORTJ\T ION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 198
COUNTY P.1.NO.
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL YEAR
COST HTS
-RA-N-C-O-C-K----SR---1-5-O--V-ER---W-R-I-T-T-EN---C-R-E-E-K-------------------------. -------------------------------------------------------P-E---19-9~3-----U-N-D-ER-W--AY
231330 BRIDGES/ RECST. OR REHAB.
CONG DIST. 11
ROW 1996
PROJECT HILEAGE : .25 HJ\NAGER: D. GRIFFITH
FUND SOURCE: SURFACE TRANSPORT.
CONST
A$FTER H'
FEDERAL HIGHWAY ADHIN FUNDS
231310 IS AN ASSOCIATED PROJECT.
r.
.. ,
..
t~
,.
,t e ....
~~
~$i{~
~1.
~
r
-;,
~ I
~
~~~
)JD~$
!mt~~
~
If;!,:~ ~
i:
~
Ii':~
rr;~:~
~
.. -~~
r.-'::~
~"
COUNTY P,I,NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
HARALSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 681363 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HARALSON MANAGER: STEVE KISH
CONG DIST, 7
r.
FUND SOURCE: RURAL TRANSIT
FEDERAL TRANSIT ADHIN FUNDS
16-Sep-1993 Page 199
FISCAL .. . COST
YEAR
------------
E-S-T-S---
OPERATING 1994
$
60
FED SR.ARE$
36
GA, SR.ARE $
0TH SHARE$
24
HARALSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1364 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HAAA.LSON MANAGER: STEVE KISH
CONG DIST, 7
OPERATING 1995
$
64
FUND SOURCE: RURAL TRANSIT
FED SHARE$
38
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE$
26
HARALSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 681365 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HARALSON MANAGER: STEVE KISH
CONG DIST. 7
OPERATING 1996 $
67
FUND SOURCE: RURAL TRANSIT
FED SHAR~ $
40
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
27
HARALSON ONE CONVERSION VAN WITH LIFT 6C2364 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: HARALSON MANAGER: STEVE KISH
HARALSON I-20 SAFETY IMPROVEMENTS FRM ALA STATE LINE TO SR 61/CARROLL
610910 GUARDRAIL/ TRAFFIC
.
PROJECT MILEAGE 1 22,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER!
CONG DIST. 7 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
CONG DIST. 7 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
CAPITAL 1995
$
32
FED SHARE$
26
GA. SHARE$
3
0TH SHARE$
3
PE NONE
$
0
ROW NONE $
0
CONST 1994
$
189
FED SHARE$ 189
GA. SHARE$
0TH SHARE$
HARALSON SR 120 BTNN BUCHANAN, DALLAS/PAULDING co ... 2 EB, 1 WB
621580 ADDITION or A PASSING LANE.
PROJECT MILEAGE: 3.87
MANAGER: BILL MCVEY (HI
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW CONST
UNOER"AY AFTER 96
AFTER 96
HARALSON CR 342/S-1618 FM SR 8/US 78/BREHEN N TO HORGAN RO/CR 346 631140 MINOR WIDEN, RESURF / RECST. OR REHAB.
PROJECT MILEAGE : 5.36 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: BILL MCVEY (H)
_CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$ 296 AFTER 96
,;r.nr,,:11\ pr.r./\llTHF.IIT or Tl>/\ll~PflllT/\TTt111
ST/\TF: TRJ\IISrPRT/\T.ION IMPROVEMENTS PROGRJ\H
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 200
------------------------------------------ COUNTY
P,I.NO,
DESCRIPTION PROJECT DATA
RARALSON CR J42/VINSON MTN RO FH CR CJ1143 RECONSTRUCTION & WIDENING,
PROJECT MILEAGE: 4.64
MANAGER! BILL MCVEY (HI
346/HORGAN RON TO CR 345 NO LANE ADDITION PROPOSED.
COHHe:NTS
--------------
CONG DIST, 7 .
FUND SOURCE: SURFACE TRANSPORT,
FISCAL YEAR
PE 1992 ROW 1996 CONST
COST ESTS
UNDERWAY $ 200 AFTER H
.FEOERN, HIGHWAY ADHIN rm;os
HARALSON CR 342/440 FH CR 345 N TO CR 168/PLEASANT HILL RO/POL~ CO C31145 MINOR WIDEN, RESURF / RECST. OR REHAB.
PROJECT MILEAGE : 5,28 - EXIST .. LANES: 2 /PROPOSED LANES: 2
MANAGER! BILL MCVEY (M)
CONG oisT. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER H
HARALSON SR 8 EB HP 15.8-17,31 CENTER TL HP 14.0-14,9
831170 ADDITION or A PASSINO LANE.
PROJECT MILEAGE t 2.20
MANAGER! BILL MCVEY
CONG DIST, 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
RO" 1995 CONST
UNOER"AY $ 274 AFTER H
HARALSON SR 100 FM TALLAPOOSA TO C!DMTOWN/POL~ . WON 10 BOX CLVTS
831180 BRIDGES/ RECST, OR REHAB, PROJECT MILEAGE : 1,80 MANAOERt. BILL MCVEY (H)
CONG 01ST. 7
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADHIN FUNDS
PE 1992
ROW
CONST
UNDERWAY
AFTER 96 AFTER 96
HARALSON U1950
SR 1/US 271 REPLACEMENT
OVER SOUTHERN RAILROAD IN BUCHANAN,
or THE EXISTING BRIOGES(SI. NO ADDED
LANES.
PROJECT MILEAGE : .00
MANAGERt
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1995 ROiif
CONST
$
12
AFTER 96
AFTER 96
t
~
C>t
,..
mi~
~-a
,, . ~--
~
I ~ - I
!iii~,~
lttlC~
lt!--::;~
~
==i:,-...;,
. l!i!tI~ ~k.t;~.,
~~ - ~1
j~::S-;;~!
~f':-:f~
... ,i....
.... .. ,
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 201
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,1.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
H--A-R-R-IS----S-T-G--2--P-A-V--IN-G---FM---N--O-F--S-M-IT-H---R-O--T-O--S--O-F--S-R--1-1-6-/--1-0.,-1-4--H-I---------------------------------------------
----------------------
Pl!: NONE
$
0
310043 RIDING SURFACE REHABILITATION. SURFACE, GRIND,-SEAL, STRIPE ETC.CONG DIST. 3
ROW NONE $
0
PROJECT MILEAGE: 10.14 - EXIST. LANES: 0 /PROPOSED LANES: 0
.
CONST 1994 $ 3350
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE CONST.
FED SHARE$ 3015
.
FEDERAL HIGHWAY AOMIN FUNDS
GA. SHARE$ 335
0TH SHARP!$
HARRIS 310083
STG 2 PAVING FH S OF SR 116/TO SR 18/ 8.54 HI
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 3
PROJECT MILEAGE : 8,54 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE CONST.
FEDERAL HIGHWAY AOHIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 2888 2599 289
HARRIS 310283
STG 2 PAVING FM S OF SR 18/HMRIS TO S OF US 27/TROUP CO
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 3
PROJECT MILEAGE : 8.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE CONST,
FEDERAL HIGHWAY AOHIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$ 0TH sHARE $
0 0 3237 2913
324
HARRIS 311710
CALL BOXES ON I-85 FM ALABAMA TO SR 74/FULTON MISCELLANEOUS IMPROVEMENTS/ NEW CONSTRUCTION PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 7 , 3
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY AOMIN FUNDS
HARRIS 31172X
CALL BOXES ON I-185 FM SR 22/HUSCOGEE TO I-85 . SEE MUSCOGEE UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 3 , 7
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY AOMIN FUNDS
PP! 1994 $
20
RO" NONE $
0
CONST 1996 $ 700
FED SHARP!$ 630
GA. SHARP! $
70
0TH SHARP!$
PE 1994 $
o
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA, SHARE$
0TH SHARE$
HARRIS 331590
SR 116@ SPARKS CREEK W OF SR 85W REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ONOP!R"A'f
ROW 1994 $
15
CONST 1995 $ 273
FED SHARE$ 218
GA, SHARP! $
55
0TH SHARE$
HARRIS 342780
SR 1/US 27@ SR 354 IN PINE MOUNTAIN INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE: ,48 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: GORDON BROWN
CONG DIST. 3 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
PE 1994 ONDER"At
ROW LOCL
CONST 1995 $ 220
FED SHARE$ 198
GA, SHARE$
22
0TH SHARE$
r.r,np,: I/\ r,,=:r /\RTMF.tlT OF Trt/\tlSPORT/\T l(lN ST/\TE TRANSrORT/\TION IMPROVEMENTS PROGRJ\H PROJECT LISTING BY COUNTY FY 199./FY 1996
16-Sep-1993 Page 202
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL YEAR
COST
l!!STS
R--A-JU-l-IS----S-R--8-5--9--C-E-N-T-R-A--L--C-H-U-R-CH---R-O-A-D-/-C-R--1-8-7---------------------------------------------. --------------------------P-l-!!-N-O-N-I-!!-~--$------O
32820 TURN LANES/ TRAFFIC
CONG DIST. 3
Ro,r NONI!! $
o
PROJECT MILEAGE : .14 - EXIST, LANES! /PROPOSED LANES: 5
.
CONST 199. $
55
HANAG!Rt GORDON BROWN
FUND SOURCE: HWY, SAFETY
FED SHARE$
50
FEDERAL RIG~"AY ADHIN FUNDS
GA, SHARE$
6
0TH SHARE$
RAJUlIS 371220
CR 268/~ING GAP ROAD@ CRAWFORD CREE~ NEAR MERIWETHER COLN
REPLACEMENT or TRE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT HILl!!AGE 1 ,20
HANAG!Rt GORDON BROWN(H)
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL RIGH"AY ADHIN FUNDS
Pl!! 1994
$
10
Ro,r LOCL
CONST 1996 $ 337
FED SHARE$ GA, SHARE$
270
n
0TH SHARE$
l
... ,,
,, ,
l1 I
~
~
~
~
~
~
~~!!ll
-1),\Qj
Wit,
~~ ~J.~
.,
C-:
~
1!$,.'i-1~
1t:'., :::~,
\:-:-- - ~-
f r "
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
RAAT 181028
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HART MANAGER: STEVE RISH
CONG DIST, 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
.
'
16-Sep-1993 Page 203
FISCAL , COST
YEAR
ESTS
------------------
OPERATING 1994 $
35
FED SHARE$
19
GA, SHARE $
OTR SHARE$
u
RAAT 181029
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RAAT MANAGER! STEVE RISR
CONG DIST. 10
OPERATING 1995 $
38
FUND SOURCE: RURAL TRANSIT
FED SRAAE $
20
FEDERAL TRANSIT ADHIN FUNDS
GA. SRAAE $
OTR SHARE$
18
RART 181030
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HAAT MANAGER: STEVE RISH
CONG DIST. 10 r.
OPERATING 1996 $
u
FUND SOURCE: RURAL TRANSIT
FED SRAAE $
22
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
19
HART 1C2028
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HART MANAGER: STEVE RISH
CONG DIST. 10
CAPITAL 1994
$
31
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
HART 121430
SR 77 NB FM CEDAR CRR TO CR 23 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.33 MANAGER: L. OWENS
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
929
FED SHARE $ 743
GA. SHARE $ 196
0TH SHARE $
HART 131020
SR 77/PASS & TURN LANE & INTERSECT IHPR 9 SR 51 ADDITION OF A PASSING LANE. PROJECT.MILEAGE : 1.90 MANAGER: L. OWENS
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW 1993 UNDERWAY CONST 1994 $ 903
FED SHARE $ 722 GA. SHARE $ 191 0TH SHARE $
HART 132130
S HARTWELL BYP FM SR S1/SR 366 TO SR 8/CR 403 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : 5.20 MANAGER: RON BRAZIEL (HI
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
COUNTY P,!.NO,
DESCRIPTION PROJECT DATA
r.F.ORr.JA OF.PARTMENT or TPANSrORTATION STATE TRJ\IISPORTATIOII IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
AMT
132150 .
SR 77 FH SR 77 C TO SR 59:EB HL 17.41 TO HL 18,78 HINOR WIDEN, RESURF / RECST, OR REHAB. PROJECT MILEAGE : 4.83 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER! L, OWENS .
CONG D)ST, 10 .
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIH FUNDS
KART 132160
SR 77 FM SR 51 TO SR 77C:FH HP 13.72-15.0:WB HP 11,0-17,0
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 5.20 MANAGER: L. OWENS
CONG DIST~ 10
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY AOHIN FUNDS
AMT 141850
SR 51 AT CR 503 AND CR 405 TURN LANES/ TRAFFIC PROJECT MILEAGE : , 00 - EXIST. LANES: .0 /PROPOSED LANES: 0
MANAGER:
CONG.DIST, 10
FUND SOURCE: HWY. SAFETY. FEDERAL HIGHWAY AOHIN FUNDS
AMT 1708U
CR 240/GRIFFIN RD OVER LITTLE SHOAL C~ NE OF BOWERSVILLE REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES,
PROJECT MILEAGE: ,10 MANAGER: L, OWENS
CONG DIST, 10
FUND SOURCE: BRIDGE PRO~RAM FEDERAL HIGHWAY AOHIN FUNDS
HAAT 170843
CR 245 9 SHOAL CREE~ 6,5 HI NE OF BOWERSVILLE
REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE: .22 MANAGER:
HART 171080
CITY OF HARTWELL COURTHOUSE SQUARE
r
SIDEWAL~S / ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOHIN FUNDS
CONG DIST, 10 FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY AOHIN FUNDS
16-sep-1993 Page 204
FISCAL
COST
YEAR
ESTS
P-B---1-9-9-3-.----U-N-DE-R-W--AY
ROW 1993 UNDERWAY
CONST 1995 $ 1236
FED SHARE$ 989
GA, SHARE $ 247
0TH SHARE 9
PE 1993 UNDERWAY
ROW 1994 $ 233
CONST 1996 $ 2271
FED SHARE $ 1817
e GA. SHARE $
0TH SR.ARE
454
PE NONE $
0
ROW 1995 $
1
CONST 1996 $
58
FED SHARE$
52
GA. SHARE$
6
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1994 $ 225
. FED SHARE $ 180
GA., SHARE$
45
0TH SHARE$
PE 1994 $
11
ROW LOCL
CONST 1996 $ 363
FED SHARE$ 290
GA, SHARE$
73
0TH SHARE$
PE LOCL
ROW NONE $
.0
CONST 1996 $
21
FED SHARE $'
17
GA. SHARE$
0TH SHARI!!$
4
l
.., it
....
... .
~
ilf!!
~
,t'
~,,.
~ ~
~ ~
Hi~~
~
~
~~;~~! ~:il.:"!'i~
'
11
~1~
~~
~;:;fili._'il
it,''r::c+a
,i-;'_,...:,.
....
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT. LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 205
COUNTY
DESCRIPTION
FISCAL COST
P,I.NO,
PROJECT DATA
COMMENTS
YEAR
P.:STS
HENRY COUNTY OPERATED PUBLIC TRANSIT SERVICE
---------------------------------------------
381229 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 3 , 11
FUNDS RECIPIENT: HENRY MANAGER: STEVE KISR
OPERATING 1994 $
59
FUND SOURCE: RURAL TRANSIT
FED SHARE$
35
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
OTR SHARE$
24
HENRY 381229
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HENRY MANAGER: STEVE KISH
CONG DIST. 3 Ii 11
OPERATING 1995 $
61
FUND SOURCE: RURAL TRANSIT
FED SHARE$
36
FEDERAL TRANSIT ADHIN FUNDS
GA. SRARE $
0TH SHARE$
25
HENRY 381230
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HENRY MANAGER: STEVE KISH
CONG DIST. 3 Ii 11
OPERATING 1996 $
63
FUND SOURCE: RURAL TRANSIT
FED SHARE$
37
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
26
HENRY 3C2229
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HENRY MANAGER: STEVE KISH
CONG DIST. 3 Ii 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
CAPITAL 1995
$
20
FED SHARE $
16
GA. SHARE,$
2
0TH SHARE$
2
RENRY 3C2230
ONE CONVERSION VAN WITH LIFT ANO ONE STANDARD VAN
TRANSIT FACILITIES/ CAPITAL
.
FUNDS RECIPIENT: HENRY
MANAGER: STEVE KISR
CONG DIST. 3 Ii 11
CAPITAL 1996
$
52
FUND SOURCE: RURAL TRANSIT
FED SRARE $
42
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
0TH SHARE$
5
HENRY 3V1031
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN RENRY COUNTY
MANAGER: STEVE KISH
CONG DIST, 6 Ii 4
CAPITAL 1994
$
11
FUND SOURCE: ELDERLY Ii DISABLED FUND FED SHARE$
9
FEDERAL TRANSIT ADHIN FUNDS
GA, SHARE$
1
0TH SHARE$
1
HENRY 3V1032
ELDERLY ANO DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL
r
FUNDS RECIPIENT: AGENCIES IN HENRY COUNTY
MANAGER: STEVE KISH
CONG_OIST. 6 Ii 4
CAPITAL 1995
$
11
FUND SOURCE: ELDERLY Ii DISABLED FUND FED SHARE$
9
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
r.F.011,;1/\ [IF.P/\PTMF.IIT or TPJl.tlSPORT/\TION
ST/\Tr, TR/\NsroRTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 206
COUNTY P.I.NO.
-H-EN-R-Y------E-L-D-ER--LY---A-N-D
DESCRIPTION PROJECT DATA
DISA-B-LE-D---V-E-H-IC--LES
AND
FISCAL
COST
COMMENTS
YEAR
ESTS
EQUIPM-E-N-T----------------------------------------------------------------------.---------
JV1033 TRANSIT PROJECTS/ CAPITAL
CONQ DIST. 6 & 4.
FUNDS RECIPIENT: AGENCIES IN HENRY COUNTY MANAGER! STEVE KISH
CAPITAL 1996
$
12
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
10
FEDER.AL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
HENRY 310976
I-75 FM 1-675 TO SR 7/US 41/CLAYTON (NOISE BARR. , LIGHTING)
WALLS/ RECST, OR REHAB,
-
PROJECT MILEAGE : 7,80 - EXIST, LANES: 2 /PROPOSED LANES: 4
MANAGER: J, GRAYBEAL
ATLANTA TIP I CL-R 12
CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 31097X IS AN ASSOCIATED PROJECT.
PE 1996
ROW NONE CONST
$
79
$
0
AFTER 96
RtNRY 311120
SR 20/SR 81 OVER I-75 BRIDGES/ RECST, OR REHAB, PROJECT MILEAGE: ,30 MANAGER: J. GRAYBEAL
HENRY 321145
N-S 1-WAY PAIR/MCDONOUGH FH N/RACETRACK RD TO N/CARHICAEL ST
CONSTRUCTION or NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : 1.20 MANAGER: N, PASSMORE (HJ
HENRY 321520
SR 20 FM NEAR I-75 TOE or SOUTHERN RR/MCDONOUGH
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 2.10 MANAGER: J, GRAYBEAL
ATLANTA TIP I RE 1 CONG DIST,. 3
FUND SOURCE: I-STATE HAINT, FEDERAL HIGHWAY ADHIN FUNDS
ATLANTA TIP I HE 10
CONQ DIST, 3
/
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I RE 1 CONG DIST, 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE.1987 UNDERWAY ROW 1994 $ 1500 CONST 1996 $ 1863
FED SHARE $ 1677 GA. SHARE $ 186 0TH SHARE $
PE 1992 -UNDERWAY ROW 1996 $ 650 CONST 1996 $ 660
FED SHARE $ 529 GA, SHARE $ 132 0TH SHARE $
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
HENRY 322050
SR 42 FM SR 138/STOCKBRIDGE N 1-675 INCL CULVT/CLAYTON RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 2.20 MANAGER: H, REYNOLDS (HJ
ATLANTA TIP I CL64/HE5
CONG.DIST. 3
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 9fi AFTER 96
HENRY -322680
SR 20/SR 81 AT PHILLIPS DRIVE IN MCDONOUGH INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE: ,25 - EXIST, LANES: 2 /PROPOSED LANES: 2
HAN~GER:
ATLANTA TIP I HE 1 CONG DIST. 3 .
FUND SOURCE: HNY. SAFETY FEDERAL-HIGHWAY ADHIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1996 $ 128
FED SHARE$ 115
GA. SHARE$
13
0TH SHARE.$
... ,..
l
~
~
,, ~- == = ~
,,
~
~
~~ll~i&J
~
~~
\f,'~!~
=,
~
~
~fi~~'i
t~?-~-;-;
GEORGIA OF.PARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 207
COUNTY P,I.NO,
DESCRIPTION PROJECT DATA
HENRY
1-"AY PAIR/MCDONOUGH FH E SOUTHERN RR TO REYS FERRY RO
FISCAL . COST
COMMENTS
YEAR
ESTS
ATLAN-T-A--T--IP--I--R-E--8-----------------------PE---1-9-9-3-----U-N-DE-R-W--AY
331370 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
CONG DIST, 3
ROW LOCL
. PROJl:CT MILEAGE : , 30 MANAGER: N. PASSMORE (H)
CONST 1996
$
55t
I
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
U3
.
FEDERAL HIGHWAY ADHIN FUNDS
GA, SHARE $
111
OTR SHARE$
HENRY 33152X
SR 155 NB 11,8-0.25 HENRY;SB 1.6-3.1/SEE SPALDING UNRNOWN / UNRNOWN PROJECT HILll:AGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 331520 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1996 CONST
UNDERWAY
$
0
AFTER 96
HENIIY 331550
SR 20 EB FH HP 14.41 TO 13.211 "8 HP 13.28 TO 11.74 ADDITION OF A PASSING LANE, PROJECT MILEAGE : 2.67 MANAGER: GORDON BROWN(H)
ATLANTA TIP I HE 11
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
380
AFTER 96
HENRY 331980
JONESBORO RO/CR 655 FH I-75 TO ENO 1-WAY PAIR IN MCDONOUGH RECONSTRUCTION, WIDENING FROM 2 LANll:S TO 4 I.ANES. PRO.JECT MILEAGE : 3.20 MANAGER: N. PASSMORE (H)
ATLANTA TIP f HE 7 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS
PE 1995 ROW LOCL CONST
$
20
AFTER 96
HENRY 370940
CR 290/S HAMPTON RO OVER TOWALIGA RIVER SE HAMPTON REPLACll:HENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES. PROJl:CT MILEAGE : .50 MANAGER: GORDON BROWN
ATLANTA TIP f RE 15 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96"
Hll:NRY 370941
CR 132/TURNER CHURCH RO OVER WALNUT CREER TRIBUTARY REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: GORDON BROWN
HENRY 72148X
SR 138 FH WALT STEPHENS RD/CLAYTON TO I-75 ,SEE CLAYTON CO
UNRNOWN / UNKNOWN PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: RON BRAZIEL
ATLANTA TIP f HE 16 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOHIN FUNDS
ATLANTA TIP f CL 31 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS 721480 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW LOCL
CONST 1995
$
259
FED SHARE$
207
GA. SHARE$
52
0TH SHARE$
PE 1992 RON 1996 CONST
UNDERWAY
$
0
AFTER 96
~~np~rA P~PAPTM~NT OF TPANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRJ\H PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 208
COUNTY
DP.:SCR IPT ION
FISCAL
COST
P,I.NO.
PROJECT DATA
COHHP.:NTS
YEAR
R--!N-R-Y-----P-A-N-O-L-A--R-D---FH---ST-A-G-E-C-O-A-C-H---R-O--T-O--F-L-M-P-.:-S--H-I-L-L--R-O-/S-E-P-.:--C-L-A-Y-T-O-N----------A-T-L-A-N-T-A--T-I-P--f--C-L-1-6-/H--E-4------------------P-E--1-9-9-5---
-P-.-:S-T-S --
$
0
1l092X RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.
CONG DIST. 3
RO" LOCL
PROJECT HILP.:AGE : .00
CONST
AFTER 9li
HANAGP.:R: UNKNOWN
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY AOHIN FUNDS
730920 IS AN ASSOCIATED PROJECT.
,,
. . "
~
~
~ ,, ..~"
~
~
m~~
~
~
M!li':!1~2B
M::.!!S!
~
~
~
I~
-.
~i:f.:..; ti~
J,,,-~ ... :,~
-
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 209
COUNTY
DESCRIPTION
FISCAL COST
P,I.NO,
PROJECT DATA
COMMENTS
YEAR . , ESTS
H-O-U-ST-O-N---E-L-D-E-R-L-Y--A-N-D---D-IS-A-B-L-E-D---V-E-H-I-C-L-E-S--A-N-D--E-O-U-IP-M--E-N-T-----------------------W-.--R-O-B-I-N-S--T-I-P--f--1---1-6-(-1-)---------------------------------
3Vl013 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 2 , 8
FUNDS RECIPIENT: AGENCIES IN W, ROBINS MPO AREA MANAGER: STEVE KISH
CAPITAL 1994
$
15
FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$
12
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
HOUSTON 3V1014
ELDERLY AND DISABLED VEHICLES ANO EOUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN W, ROBINS HPO AREA MANAGER: STEVE KISH
W. ROBINS TIP f 1-16(1)
CONG DIST. 8 , 2
CAPITAL 1995
$
15
FUND SOURCE: ELDERLY, DISABLED FUND FED SRME $
12
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
HOUSTON 3V1015
ELDERLY AND DISABLED VEHICLES ANO EOUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN" ROBINS MPO AREA MANAGER: STEVE KISH
W. ROBINS TIP f 1-16(1)
CONG DIST. 8 , 2
CAPITAL 1996
$
u
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
13
FEDERAL TRANSIT AOHIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
HOUSTON 311650
1-75@ GAINES DRIVE IN PERRY FENCE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 2
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY AOHIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
25
FED SHARE$
25
GA. SHARE$
0TH SHARE.$
HOUSTON 321590
SR 26 OVER ELKO CREEK REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE: .19 MANAGER: GORDON BROWN
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE 1990 UNDERWAY, ROW 1993 UNDERWAY
CONST 1994 $ 770 FED SHARE $ 616 GA. SHARE $ 154 0TH SHARE $
HOUSTON 322460
SR 96 FH US 129@ BONAIRE TO SR 87/TWIGGS (INCL 5 BRIDGES) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 9,32 MANAGER: RON BRAZIEL (H)
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS
PE 1994 ROW 1995 CONST
$ 538
$ 729 AFTER 96
HOUSTON 322560
I-75 AT NEW WEST PERRY BYPASS SOUTH OF PERRY INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 4 MANAGER: RON BRAZIEL
/
CONG DIST. 2 , 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS
PE 1993 UNOER"AY ROW 1995 $ 250 CONST 1995 $ 4800
FED SHARE $ 3840 GA. SHARE $ 960
0TH SHARE $
r.r.nrr.111 r>F:rl\RTMF:NT OF' TMNSrORTl\TION STl\TE TRAIISPORTl\TION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 210
H-CPO-O-U,1U-S.TN-NOT-ONY--, -W--P-E-R-R-Y--B-Y-P--F-H-DP-R-IE-O-S7-JCE5-RC-ITP-ST-.ID-OA-TNO-TA--U-S--3-4-1--@--M-G---IN--D-IA-N---C-it--W-/-B-R-ID--G-E-S--------------C-O-M-M-E-N-T-S--------------------------FP-BIYS-EC-A1A-R9-L9-3---.-.-O-ECN-SDO-TES-SRTWAI
322570 CONSTRUCTION OF NEW ROUTE WITH t LANES PROPOSED,
CONG DIST, 2, 8
ROW LOCL
PROJECT MILEAGE : 5. 60
'>
MANAGER: RON BRAZIEL
FUND SOURCE: SURFACE TRANSPORT,
CONST
AP'TBR H
FEDERAL HIGHWAY ADMIN FUNDS
HOUSTON WEST PERRY BYPASS: FH AIRPORT RO TO I-75
322590 RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : ,95 MANAGER: GORDON BROWN
HOUSTON 331750
HOUSTON RD FM SR 11 TO WALDEN/SMDISt , BIBB SPLIT UA $ MINOR WIDEN, RESURF / RECST, OR REHAB. PROJECT MILEAGE : 1.90 - EXIST. LANES: 0 /PROPOSED LANES: 2
MANAGER! GORDON BROWN
CONG DIST. 9 ' 2 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
W, ROBINS TIP I 1991-1
CONG DIST, 9, 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1994 UNDERWAY ROW LOCL
CONST 1994 $ 750 FED SRMB $ 600 GA. SHARE$ 150 0TH SHARE$
PE 1992 ROW LOCL CONST
ONDERWAY AFTER H
HOUSTON HOUSTON I.ME RO FM SR 127@ CR 279 TO SR 96/, INTER@ CR 199 331930 RECONSTRUCTION, WIDENING FROH 2 LANES TO 5 LANES.
PROJECT MILEAGE I .4 ,00 MANAGER: R. ASHHORE(HI
W. ROBINS TIP I 1992-1 CONG DIST, 9
FUNO SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER H
HOUSTON SR 127 FM PERRY CITY LHTS TO CR 279/BEM BRANCH RD
331960 RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES, PROJECT MILEAGE : 3.21 MANAGER: RAY METTS (Ml
HOUSTON
3]1965
SR 127@ MOSSY CREE!t.,.W/331960 REHAB. or THE EXISTING BRIDGE(SI. FROM 2 LANES TO 4 LANES. PROJECT:MILEAGE : .03 MANAGER: RAY METTS (Ml
HOUSTON SR 26 OVER GA SOUTHERN AND FLA RAILROAD 332120 REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE : .42 MANAGER: GORDON BROWN
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN F.UNDS 331965 IS AN ASSOCIATED PROJECT.
W. ROBINS TIP I 1993-5 CONG DIST. 9.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 331860 IS AN ASSOCIATED PROJECT.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
291
$ 753
AFTER 96
PE 1994 ROW NONE CONST
$
10
$
0
AFTER 96
PE NONE $
9
ROW 1993 UNDERWAY
CONST 1994 $ 952
. FED SHARE $ 692
GA. SHARE $ 170
0TH SHARE $
.. ;,
...
1fi I.
,, .~:.~mn SM ~ ~ ~,, ~ ~
~Mffil
~ . /}~!!~
~-~
~
ffid,::tll
J;;-:.., ' :.-.:
i'''
..
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 211
COUNTY P.I,NO.
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL. YEAR
COST ESTS
H--O-U-ST-O-N---S-R--2-6--O-V--ER---BU-R-N-H-A-M---B-R-A-N-C-H-------------------------------------------------------------------------------P-E--N-O-N-E-----$------0
332130 REPLACEMENT OF THE EXISTING BRIOGES(S), NO ADDEO LANES.
CONG DIST. 2
ROW 1993 UNDERWAY
PROJECT MILEAGE : .19
'-
CONST 1994
$
5i2
MANAGER! GORDON BROWN
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 410
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 102
0TH SHARE $
HOUSTON 332140
SR 26 BRIDGE OVER CATNA BRANCH REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES. PROJECT MILEAGE : .20 MANAGER: GORDON BROWN
CONG 01ST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
301
FED SHARE$ 241
GA. SHARE$
60
0TH SHARE$
HOUSTON 342340
SR 247C FM HOUSTON LARE RO TO SR 247/INCL INTER. IMPROVEMENT INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : 4.80 - EXIST. I.ANES: 5 /PROPOSED LANES: 5 MANAGER! GORDON BROWN
W. ROBINS TIP f 1985-6 CONG DIST. 8 , 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995 $ 797
FED SHARE$ 717
GA. SHARE$
80
0TH SHARE$
HOUSTON 350830
S. DAVIS OR FM RANDOLPH AVE TO N/OEMON VALLEY OR RECONSTRUCTION, WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .47 MANAGER: GORDON BROWN
W. ROBINS TIP f 1986-5 CONG DIST. 8 , 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 531 FED SHARE$ 425 GA. SHARE$ 106 0TH SHARE$
HOUSTON 350840
HOUSTON LARE RO/CR 535 FM SR 96 TO RICHARD RUSSELL PKWY RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2.81 MANAGER: H. ASRMORE(M)
W. ROBINS TIP f 1991-2 CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
HOUSTON 350900
GREEN ST FM AMERICAN BL TO N'SIDE, N'SIDE FM GREEN TO RAVEN TURN LANES / TRAFFic PROJECT MILEAGE : ,25 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: GORDON BROWN
HOUSTON 350930
SR 127 FM CR 272/RING'S CHAPEL RO TO PERRY CITY LIMITS RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .69 MANAGER: RAY METTS
W. ROBINS TIP f 1986-4 CONG DIST. 8 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 2 , 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1995 $ 652
FED SHARE$ 587
GA. SHARE$
65
0TH SHARE$
PE 1993 UNDERWAY ROW 1995 $ 717 CONST 1996 $ 1910
FED SHARE $ 1528 GA. SHARE $ 382 0TH SHARE $
~~VPGIA l>~PAPTM~NT OF TnANSPORTATION
STATE TIU\NSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY.COUNTY FY 1994/FY 1996
COUNTY
DESCR JPTION
P.I.NO.
PROJECT DATA
COMMENTS
R-O--U-!T-O-N---H--IS-T-O--R-IC---D-E-PO--T--R-E-S-T-O-R--A-T-I-O-N-,--L-IN--E-A-R--P-A-R-K--I-N--W-A-R-N-E-R--R-O-B.IN-S-------- W, ROBINS TIP f 1993-4
371020 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
CONG DIST, 9, 2
PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGERS CORA COOK
FUND SOURCE: TRANS, ENHANCE,
FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 212
FISCAL
- YEAR
COST
- ESTS
PE LOcL
ROW LOCL
CONST 1995 $ 2!10
FED SR.ARE$ 200
GA, SHARE$
0TH SR.ARE$
!10
..
..
,.
~ ,...
~
~
== ~
1
"
~
~
e~~
(e.~~,:ij
_, ==
~,':.'.~'!!!l
~.~~~
~ljj,c~
~~
ff?.$~rhl,S
,~~~?\-~,,~:
/~: ,.
,I!'
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 213
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO,
PROJECT DATA
COMMENTS
YEAR !STS
-U IR--"lIl-NU -----AS-R-D-D-3I-T2-I@O-N--2-o-Lr-O-AC-A-PT-AIO-S-NS-SIN-G-IN--L-AI-RN-"E-I.N---C-O-U-N-T-Y-1--2--I-N--C-O-F-F-E-E--C-O-U-N-T-Y-----------C-O-N-G--D-I-S-T-,--8---------------------------R-OP-WE--11-99-99-23-----UU-NN-DDE-ER-RW-"A-AYY
PROJECT MILEAGE: 3,95
CONST 1994
$
925
MANAGER: J, LINDSEY
FUND SOURCE: SURFACE TRANSPORT . .
FED SHARE $ 740
FEDERAL HIGH,,AY ADMIN FUNDS .
GA, SRARE $ 185
0TH SHARE $
IR"IN t21960
SR 11/US 129@ REEDY CRR, STUMP CRR
REPLACEMENT or TRE EXISTING BRIOGES(S). NO AOOED LANES.
PROJECT MILEAGE: 1,00 MANAGER! J, LINDSEY
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PB 1992 ONDER"AY
ROW 1994 $
10
CONST 1995 $ 716
FED SHARE$ 573
GA, SHARE$ 143
OTR SHARE .$
COUNTY P.J.NO.
DESCRIPTION PROJECT DATA
r.F.nPr.111 OF.PAPTHENT or TRJ\tlSPOPTATION
STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
JACKSON 1B1078
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISR
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
JACKSON 1Bl079
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
JACKSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 1Bl080 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISH
CONG DIST, 10
FUND SOURCE: RURAL TRANSr'T FEDERAL TRANSIT ADHIN FUNDS
JACKSON 1C2078
ONE CONV, VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
JACKSON 110250
SR 11/US 129 FM !/MIDDLE OCONEE RVR TO CR. 236/INCL I-85 BR RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .45 MANAGER: H GANNAWAY (C)
CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 214
tISCAL YEAR
COST ESTS
- --~--------
OPERATING 1994 $
25
FED SHARE$
141
GA. SHARE$
0TH SHARE$
10
OPERATING 1995 $
25
FED SHARE$
141
GA, SHARE$
0TH SHARE$
11
OPERATING 1996 $
26
FED SHARE$
15
GA. SHARE$
0TH SHARE$
11
CAPITAL 1994
$
53
FED SHARE$
42
GA, SHARE$
6
0TH SHARE$
5
PE 1992 ROW 1995 CONST
UNDERWAr $ 1152 AFTER 96
JACKSON 11044Z
1-85 SIGN HOD FH DEK CL TO SC STATE LN . GWIN/BANKS/BAR/FRANK
SIGNING/ MAINTENANCE
.
PROJECT MILEAGE : 76,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
JACKSON 121340
SR 11/ US 129/@ ALLEN CREEK N OF T.a.LHO REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDEO LANES.
PROJECT MILEAGE : .25 MANAGER: L. OWENS
CONG DIST. lo_, 6 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS 110440 IS AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE NONB $
0
ROW NONE $
0
CONST 1994 $
0
FED SHARE $
GA. SHARE$
0TH SHARE$
PE 1987 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
-~
.. '.
,,
~
~
~ ~,,
~
l'.fifi
~
,~~
~.ii,IY._~
U~JO!fl l@!OJ~
I!~.!~
l\!C.t:t.1
~~:".':~:"::;.~
rc>-- ..,
COUNTY P.I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
JACKSON 121600
SR 11 FH SCL PENDERGRASS TO SR 332 / PART NEW LOCATION RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. '
PROJECT MILEAGE : 3.30 MANAGER: M GANNAWAY (M)
CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
-~-
16-Sep-1993 Pagt1 215
FISCAL_
COST
YEAR
ESTS
P-E---1-9-9-3-----U-N-DE-R-W--AY
Row
AFTER 96
CONST
AFTER 96
JACKSON 121604
SR 11 FH PROP, JEFFERSON BYP W TO S CITY LIMITS PENDERGRASS RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 2.40 MANAGER: H GANNAWAY (C)
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNOERWAY $ 3190 AFTER 96
JACKSON 122150
SR 11 FH SR 332/TALHO TO SR 323/HALL COUNTY RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 7,40
MANAGER: TONY OUM (M)
CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
JACKSON 12216X
SR 15 ALT/US 129 FH LAVENDER OR IN CLARKE CTY TO SR 330 RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES,
PROJECT MILEAGE: .00 MANAGER: RON BRAZIEL
JACKSON 122170
SR 15 ALT/US 129 FH SR 330 TO JEFFERSON BYP@ CR 104 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES, PROJECT MILEAGE: 6.70
MANAGER: R. ASHHORE(M)
CONG DIST. 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122160 IS AN ASSOCIATED PROJECT.
CONG DIST, 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE ROW 1994 CONST
$
0
$
0
AFTER 96
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
JACKSON 122510
SR 15 ALT IN JEFFERSON AT BIG CURRY CREEK
REHAB. or THE EXISTING BRIDGE(S). FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE: .15 MANAGER: L. OWENS
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
JACKSON 132040
JEFFERSON BYP FM SR15 ALT SE CL/ARCADE NW TO SRll NEAR CR229 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE: 6.93 MANAGER: H. ASHMORE
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
COUNTY ,.I.NO,
DESCRIPTION PROJECT DATA
~r.nr,r. I II l'F:rl\PTMF:IIT f\f Tf>.IINSrORTI\T lON STATE TRI\NSrORTI\TION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
16-Sep-1993 Page 216
FISCAL YEAR
COST ESTS
JACKSON SR 335 "/NICHOLSON@ NORTH OCONEE RIVER . PE 1 9 8 9 . UND!R"AY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 ______ _
132070 R!PLAC!HENT OF THE EXISTING BRIDO!S(S), NO ADDEO LANES,
COHO DIST, 10
ROW 1994 $
10
PROJECT MILEAGE : .11
.
CONST 1995 $ 800
MANAGER: L, OWENS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 640
FEDERAL HIGHWAY ADMIN FUNDS
GA, SHARE$. 160
OTR SHARE$
JACKSON 132380
INTERSECTION IHPROVEHENTS ON SR 538 SR 124/HP 3.74-3.76
INTERSECTION IHPROVEHENT / TRAFFIC PROJECT MILEAGE: ,34 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: L, OWENS
CONG DIST, 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1994 $ 275
FED SHARE$ 248
GA, SHARE$
28
0TH SHARE$
JACKSON 171000 .
CR 184 8 "A.LNUT CREEK 4 HI NORTH or BRASELTON
REPLACEMENT OF THE EXISTING BRIDGES(SJ. NO ADDED LANES, PROJECT MILEAGE: .20
MANAGER:
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
6
ROW LOCL
CONST 1996 ? $ 1H
FED SHARE$ 10
GA, SHARE$
37
0TH SHARE$
JACKSON 171001
CR 269@ CANDLER CREEK 8,5 HI NE OF TALMO REPLACEMENT OF TR! EXISTING BRIDGES(SI, NO ADDED LANES, PROJECT MILEAGE: ,20 MANAGER:
CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
19
ROW LOCL
CONST 1996 $ 630
FED SHARE$ 504
GA, SHARE$ 126
0TH SHARE$
JACKSON 171002
CR 367/WRITES BOTTOM ROAD@ WALNUT CREEK NE OF BRASELTON REPLACEMENT OF THE EXISTING BRIDGES(SI, NO ADDED LANES, PROJECT MILEAGE: ,20 MANAGER:
CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
7
ROW LOCL
CONST 1996 $ 223
FED SHARE$ 179
GA. SHARE$
45
0TH SHARE$
k
'W
.. '
11ft
tffiM
~
i,. M
~
"
~
~
~
ffl!!.I]
~
1-/)'ii!...,1\
~
~JI!~
1:.:c:!i,
tr,~W:~
t:;r.-:..":~
.,~
f:t.
GEORGIA DEPARTMENT or TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 217
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL.
COST
P,I.NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
J-E-F-F--D-A-V--S-R---19--F-H--H--eC-L-O-U-D---R-D-/C-R---3-2-1--T-O--N-O-R-T-H--o-r--H-e-C-L-O-U-D--C-I-R-/-C-R--1-4-6------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY
522660 TURN LANES/ TRAFFIC
CONG DIST. 8
ROW 1995 $ 126
PROJECT MILEAGE : .46 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST 1995 $ 365
MANAGER: PETE BLOCKER
FUND SOURCE: HWY. SAFETY
FED SHARE $ 329
FEDERAL HIGHWAY AOHIN FUNDS
GA. SHARP! $
37
OTR SHARE $
r.F.oflr. I I\ f1F.P I\RTMF.IIT OF TRJ\NSPORT I\T I ON
STATF. TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P.I.NO,
PROJECT DATA
COMMENTS
J-E-F-F-E-R-S-O--C-O-U-N-T-Y--O-P-E-R-A-T-E-D---PU--B-L-IC---T-R-A-N-S-IT -SER-V--IC-E---------------------------------------.-----
281129 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 11
I
FUNDS RECIPIENT: JEFFERSON MANAGER! STEVE KISH
FUND SOURCE: RURAL -TRANSIT
FEDERAL TRANSIT ADHIN FUNDS
JEFFERSO COUNTY OPERATED PUBLIC TRANSIT SERVICE 281129 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: JEFFERSON MANAGER: STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
JEFFERSO COUNTY OPERATED PUBLIC TRANSIT SERVICE .281130 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: JEFFERSON MANAGER! STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
JEFF!RSO ONE STANDARD VAN, ONE CONVERSION VAN/LIFT, TWO MOBILE RADIOS
2C2128 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: JEFFERSON
r:
MANAGER: STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
JEFF!RSO ON! STANDARD VAN ANO ONE MOBILE RADIO 2C2129 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: JEFFERSON MANAGER: STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
JEFFERSO RESTORE OLD MARKET HOUSE ON BROAD STREET/LOUISVILLE 270990 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 11
FUND SOURCE: TR.ANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 219
FISCAL YEAR
COST ESTS
OPERATING 1994 $
78
FED SHARE$
u
GA, SHARE$
0TH SHARE$
34
OPERATING 1995 $
82
FED SHARE$
47
GA. SHARE$
0TH SHARE$
36
OPERATING 1996 $
87
FED SHARE$
50
GA, SHARE $
0TH SHARE$
38
CAPITAL 1994
$
53
FED SHARE$
42
GA, SHARE$
6
0TH SHARE$
5
CAPITAL 1995
$
20
FED SHARE$
16
GA. SR~E $
2
0TH SHARE$
2
PE LOCL
ROW NONE $
0
CONST 1996 $ 170
FED SHARE$ 136
GA, SHARE$
0TH SHARE$
34
..
. 10-r.
1(,~
~
~
. ~:@! = ~ ~.,
&:on:_e = ,
r==.<!l
~J~~~
~
~~~
l!!!i'!~i~ ltLni":lii ~-,K:::~ ft'::-:-;;: .. :,,.. ' .-~-.,\
.,~
.~
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY '1996
COMMENTS
JENKINS 2BllJJ
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JENKINS MANAGER: STEVE RISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
16-Sep-1993 Page 219
FISCAL
COST
YEAR
11!:STS
----------------------------
OPERATING 1994
$
30
FED SHARE$
17
GA. SHARE$
0TH SHARE$
13
J!:NKINS 2811]4
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JENKINS MANAGER! STEVE RISH
CONG DIST. 11
OPERATING 1995 $
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
18
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE $
0TH SHARE$
14 -
JENKINS 281135
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JENKINS MANAGER: STEVE RISH
CONG DIST. 11
OPERATING 1996 $
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
19
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
14
JENKINS 2C2133
ONE STANDARD VAN ANO ONE HOBIL! RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: JENKINS MANAGER: STEVE RISH
CONG DIST. 11
CAPITAL 1994
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
JENKINS ONE CONVERSION VAN WITH LIFT ANO ONE MOBILE RADIO
2C2134 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: JENKINS MANAGER: STEVE RISH
I_
CONG DIST. 11
CAPITAL 1995
$
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
4
0TH SHARE$
3
JENKINS 221640
SR 23/US 25@ OGEECHEE RIVER SOUTH OF SR 17 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : 1.30 MANAGER: R FULBRIGHT (M)
CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 221645 IS AN ASSOCIATED PROJECT.
PE 1994 ROW NONE CONST
$
195
$
0
AFTER 96
JENKINS 221645
us 25@ OGEECHEE RIVER OFLW s or SR 17 REPLACEMENT or THE EXISTING BRIDGES(SI. FROM 2 TO 4 LANES.
PROJECT MILEAGE : 1.09
MANAGER: R FULBRIGHT
CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 221640 IS AN ASSOCIATED PROJECT.
PE 1994 ROW NONE CONST
$
36.
$
0
AFTER 96
1:r.npr. JI\ r,r.rl\PTMF:tlT Of' TP.I\N~rORTI\T ION
STATE TRANSPORTI\TION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
Dl!:SCRIPTION
P,I.NO.
PROJECT DATA
J-E-N-K-I-N-S---S-R--1-2-1-/-U-S--2-5--O-V-E-R--O-G-E-E-C-H-E-I-!:--RV---O-V-E-R-F-L-O-W--,--L-IT-T-L-I-!:- - BUCKHEAD CK
--
COMMENTS
2225t5 REHAB. or THI!: 1!:XISTING BRIDGl!:(SI. FROM 2 LANES TO 4 LANl!:S.
CONG DIST. 11
PROJECT HILl!:AGI!: : .00
GRIP PROJECT
MANAGER: K FULBRIGHT (H)
FUND SOURCF.: BRIDGE PROGRAM
FEDERAi, 111 :lfWI\Y AOHIN FUNDS
222540 IS AN ASSOCIATED PROJl!:CT .
16-SP.p-1993 Page 220
FISCAL YEAR
PE 1994 ROW NONE CONST
COST
--- ESTS
$ 150
$
0
AFTER 9fi
'
/ .
9
'
..... ,,,.
~
-
~
~
~
~
~
~
~ $i:'.:t.1Jffl
l'!.'1,.t:~
t!U@
~-.:::-~~.::@
f#.:i;;fi~
i;~:: .. :~
.,. ~r>
GEORGIA ~ErARTMENT OF TRANSPORTATION
16-Sep-1993
STAT TRANSPORTATION IMPROVEMENTS PROGRAM
Page 221
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO,
PROJECT DATA
COHHNTS
YEAR
!STS
J-O-N--!S-----S-R---22-/-G-A-A-Y---FH---O-LD---C-L-IN-T-O-N---H-W-Y-/-C-R--1-8--T-O--C-R--9-6---A-S-T--O-F--G-R-A-Y------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
322030 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST, 3
ROW 1996 $ 1886
PROJECT MILEAGE: 1.54
CONST
AFTER 96
MANAGER: H GANNAWAY (H)
FUND SOURCE: SURFACE TRANSPORT,
FEDERAL HIGHWAY ADHIN FUNDS
JON!S 331850
SR 18 EB HP14.85-16.l;EB HP 21,9-23.6:WB HP 17.14-18.7
ADDITION or A PASSING LANE.
PROJECT MILEAGE : 4.51 HANAG!Rt GORDON BROWN(H)
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY
$
39
AFTER 96
t
COUNTY P. I .NO.
DESCRIPTION PROJECT DATA
,:r.npr; 11\ (lf.r I\PTMF.IIT ()f" TIU111sr0RTI\T 1011 ST /\TE TIUIIISPORT I\T IOU I MPROVEHENTS PROGRI\H
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
16-Sep-1993 Page 222
FISCAL YEAR
COST ESTS
LAHM COUNTY OPERATED PUBLIC TRANSIT SERVICE
-----------------------------------------------------~-------
3B1515
TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: LAHAR COUNTY
MANAGER! STEVE ~ISR
CONG DIST. 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $ FED SHARE$ GA. SHARE$
42 25
0TH SHARE$
17
LAHM 3Bl5U
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: LAHAR COUNTY
MANAGER: STEVE ~ISH
CONG D1!1T. 3
OPERATING 1995 $
42
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
17
LAHAR 3B1517
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: LAHAR COUNTY
MANAGER: STEVE ~ISH
CONG DIST. 3
t
FUND SOURCE: RURAL TRANSIT
OPERATING 1996 $
45
FED SHARE$
27
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
19
LAHAR ONE CONVERSION VAN, ONE STANDARD VAN, BASE STATION, 2 RADIOS
3C2515 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 3
FUNDS RECIPIENT: LAHAR COUNTY
CAPITAL 1994
$
58
MANAGER: STEVE ~ISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
46
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
6
0TH SHARE$
6
LAHAR 321)70
SR19 SB 14,7-15.2;MONROE:EB 2.3-3.61WB 2.35-3.71TL 5.25-5.6
ADDITION or A PASSING LANE.
PROJECT MILEAGE : 4.20
MANAGER: GORDON BROWN(M)
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROtf 1995 CONST
UNDERtfAY
$ 290 AFTER 96
LAHAR 331820
SR 36: NB MP-10.15-11.751 SB 14.20-15.85; NB 17.85-19.35
ADDITION or A PASSING LANE.
PROJECT MILEAGE: 4.75
MANAGER: GORDON BROWN(M)
CONG DIST . 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992
ROtf 1995 CONST
UNDERWAY
$
44
AFTBR 96
,~
,, 0
..
9H
~
~
~ ,.
~
=~ =
= ~
i!,t~
-~
/,;,.,:::Wfi
=~ ..
l'!:..~~
l/!)~l!i~
l~,:;-:/~:....:
[..;,~- :~...:
COUNTY P.l.NO.
01!:SCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COHHENTS
LAURENS 281143
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LAURENS MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
LAURENS COUNTY OPERATED PUBLIC TRANSIT SERVICI!:
2Bllf4 TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LAURENS MANAGER! STEVE KISR
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
LAURENS COUNTY OPl!:RATEO PUBLIC TRANSIT SERVICI!: 2B1145 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: LAURENS MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
LAURENS TWO STANDARD VANS ANO TWO MOBIL!!: RADIOS 2C2143 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: LAURENS MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
LAURENS I-16@ SR31/US 441 IN DUBLIN, RELOC PINERILL ROAD 210500 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .56 - EXIST, LANES: 4 /PROPOSED LANES: 4 MANAGER: RON BRAZIEL
CONG DIST. 8 GRIP PROJECT FUND SOURCE: I-STATE HAINT, FEDERAL HIGHWAY ADMIN FUNDS
LAURENS I-16 ACROSS OCONEE RIVER ANO OVERFLOWS (10 BRIDGES)
210650 BRIDGES/ RECST, OR RERAB. PROJECT MILEAGE: 2.22 MANAGER:
CONG DIST, 8
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
LAURENS 1-16 AT TURKEY CK, PUGHES CK, MERCER CK
210660 BRIDGES/ RECST, OR REHAB, PROJECT MILEAGE : ,00
MANAGER:
CONG DIST, 8
FUND SOURCE: I-STATE HAINT, FEDERAL HIGHWAY ADMIN FUNDS
...
16-Sep-1993 Page 223
FISCAL YEAR
COST !STS
-------
OPERATING 1994 $
!15
FED SHARE$
32
GA. SHARE$
0TH SHARE$
22
OPERATING 1995 $
6f
FED SHARE$
36
GA. SRARE $
OTR SHARE$
27
OPERATING 1996 $
67-
FED SRARE $
38
GA. SHARE $
0TH SRARE $
29
CAPITAL 1994
$
f2
FED SHARE$
34
GA. SHARE$
4
0TH SHARE$
4
PE 1993 UNDERWAY: ROW 1994 $ 200 CONST 1995 $ 3315
FED SRARE $ 2984 GA. SHARE$ 332 0TH SHARE$
PE 1994 $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
186 0
6195 5576
620
PE 1994 $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$ OTR SHARE$
38
0
1261 1135
126
'
r.F'.nnr.J/1 t>FT/\P.THF:NT (If" TP/\l!~rORT/\TION ST/\TE TRNISPORTATION IMPROVEMENTS PROGRAM tROJECT LISTING BY ,-ouNTY rY 1994/FY 1996
16-Sep-1993 Page 224
COUNTY
DESCRIPTION
FISCAL
COST
-------------------------------------------- P.I.NO.
PROJECT DATA
LAURENS I-16 FROH TWIGGS CL TO US 441 IN LAUREN-S--C-T-Y---. SEE BLECKL-E-Y----------
COMMENTS
YEAR PE NONE
l!!STS
$
0
21067X RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEIU., STRIPE ETC.CONG DIST. 8
ROW NONE $
0
PROJECT MILEAGE : .OO - EXIST. LANES: 4 /PROPOSED LANES: 0
.
CONST 1994 $
0
HANAGl!!Rt UNll:NOWN
FUND SOURCE: I-STATE HAINT.
FED SHARE$
FEDERAL HIGHMAY ADHIN FUNDS
GA. SHARE$
OTB SHARE$
LAURENS 221810
SR 19/DUBLIN FH HULTI-LN@ INDUSTRIIU. BLVD NW TO S-1641 , BR RECONSTRUCTION & WIDENING FROH 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.92 MANAGER: K FULBRIGHT (Cl
CONG DIST. B
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UND!RNAY
RON 1995 $ 145
CONST 1996 $ 2319
FED SHARE $ 1855
GA . SHME $
464
0TH SHARE $
LAURENS 221820
SR 29/US 441 FM NORTRVIEM AVE TO 600' N/TERRACE DRIVE,BRIDGE RECONSTRUCTION, MIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.56 . MANAGER: K FULBRIGHT
CONG DIST. 8 GRIP PROJECT FUND SOURCE: SURFACE TRANSPORT. ,FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERNAY RQW 1992 UNDERWAY CONST 1995 $ 2210
FED SHARE$ 1768 GA. SHARE$ 442 OTA SHARE $
LAURENS 222010
SR 117@ BAY CREEKS/CADWELL
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .10 MANAGER! D. GRIFFITH
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOHIN FUNDS
PE 1993 .UNDERWAY
ROM 1993 UNDERWAY
CONST .1995 $ 201
FED SHARE $
161
GA. SHARE $
40
0TH SHARE $
LAURENS 241841
SR 31 RELOCATION 8 CSX RR/ID 641050X RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: M HESTER
CONG DIST. 8
FUND SOURCE: HMY. SAFETY FEDERAL HIGHWAY AOHIN FUNDS
PE NONE RON NONE CONST
$
' 0
$
0
AFTER 96
LAURENS 81103Z
CALL BOXES ON I-16 FROH SR 87/BIBB TO I-95/CHATHAM . SEE BIBB
UNDIOWN / UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1 , 8
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
0
ROW NONE. $
0
CONST 1996 $
0
FED SHARE$
GA. SHARE $
OTR SRARE $
-
,..
.. ,. ,,
~
~
~
'
~
~ ~
mi~
~:~~
~t'-
!iffi;(i~. ~:s~
-=.,.
~
="
ij,,~1'1
~,;;;';ti
l-- - :... .~-J
-. .. ~ -'~
''
.,.
GEORGIA DEP.MTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 225
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P, t.NO,
PROJECT DATA
COHHENTS
YEAR
ESTS
L-E-E-------S-R---91-/-P-H-I-L-E-H-A---R-D--FH---D-O-U-G-H-E-R-T-Y--C-L--T-O--G-R-A-V-E-S--S-P-R-IN--G--R-D-/-C-R--5---------A-L-B-A-N-Y--T-I-P--I--R-/-R---1-2---------------------P-E--1-9-9-3-----U-N-D-ER-W--AY
.21870 RECONSTRUCTION, WIDENING FROH 2 LANES TO 5 LANES.
CONG DIST, 8
ROW LOCL
PROJECT MILEAGE: 2,81
CONST 1996 $ 3263
MANAGER: H GANNAWAY
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 2610
FEDERAL HIGHWAY ADHIN FUNDS
GA. SRARE $ 653
0TH SHARE$
LEE 45040X
CR 539/DAWSON RD@ SR 520 ... SEE DOUGHERTY CO
UNIUIOWN / UN~NOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: D, CHURCH
ALBANY TIP I R/R-13
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 450400 IS AN ASSOCIATED PROJECT.
PE 1994
ROW LOCL CONST
$
0
AFTER H
COUNTY P,I.NO,
DESCRIPTION PROJECT DATA
r.r.nPr.JA nr.PARTHF.NT OF TRAtlSrORTATION STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COHHP.:NTS
LIBERTY 911140
I-95 FM MCINTOSH co LINE TO SOUTH or JERICO RIVER
RECONSTRUCTION, WIDENING FROM 2 LANES TO 6 LANES,
PROJECT MILEAGE : 13 .15 MANAGER! H. REYNOLDS (H)
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 226
FISCAL
COST
YP.:AR
.. ESTS
P-P-.:--1-9-9-3-.----O-ND-P-.:-R-W-AT
ROW NONP.: $
0
CONST
AFTER 96
LIBERTY 511150
I-95 FM JERICO RVR/LIBERTY TO US 17/BRYAN (, JERICO RVR BR) RECONSTRUCTION, WIDENING FROM 2 .LANES TO 6 LANES. PROJECT MILEAGE : 7.26 MANAGER: M. REYNOLDS (HI
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
LIBERTY 520781
SR 196 FM US84/SR 38 TO SU 17/SR 25 SW OF I-95 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE: 8.85 MANAGER: M. REYNOLDS
CONG DIST, 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$ 950 AFTER 96
LIBERTY 521190
SR 196/@ BAUR SWAMP SLOUGH REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 5 LANES. PROJECT MILEAGE : .20 MANAGER: M. REYNOLDS
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1985 ROW 1987 CONST
UNDERWAY UNDERWAY AFTER 96
LIBERTY 522570
US 84 CONNECTOR FH S SR 196/US 84 INT TO US 84 S FLEMINGTON
CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 3.70 MANAGER! N. PASSMORE (HI
(
CONG DIST, 1
GRIP PROJECT FUND SOURCE: NAT'LHIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1995 ROW
CONST
$ 380 AFTER 96
AFTER 96
LIBERTY SR 38 AT SR 119 522630 INTERSECTION IMPROV!:MENT / TRAFFIC
PROJECT MILEAGE: .50 - EXIST. LANES: 2 /PROPOSED LANES: 5 MANAGER! PETE BLOCKER
LIBERTY 531180
SR 196 FH NW CR 119 TO 4-LANE SEC@ JOYNER OR/CR 198
RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.78 MANAGER: ~ETE BLOCKER..
CONG DIST. 1 GRIP'PROJ1!:CT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHNAY ADHIN FUNDS
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
10
ROW 1994 $
60
CONST 1994 $ 479
FED SHARE$ 479
GA; SHARE $
0TH SHARE$
PP.: 1992 UNDERWAY
ROW 1994 $ 405 CONST 1995 $ 4612
FED SHARE $ 3690
GA. SHARE $ -922 0TH SHARE $ -
,~
.,, .. {
~
~
== ~ ~ es ~ ~~t~~~?.!fi l(;;Jr~J. -..,,,.=.,....., l'f1;;.i~ ~~~
~~
1-:-~:,,..;;e,.,
:,
e:l
tJ:
GEORGIA DEPARTMENT or TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 227
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.1.NO.
PROJECT DATA
COMMENTS
YEAR
!STS
-L-IB-E-R-T-Y----C-R--1-2-1/-L-E-W--I-S--F-R-A-S-E-R--R-D--F-M--C-R--1-7-1--T-O--S-R--3-8----------------------------------------------------------------P-E--N-O-N-E-----$------0
531320 RECONSTRUCTION, WIDENING FROM O LANES TO 2 LANES,
CONG DIST. l
ROW LOCL
PROJECT MILEAGE : 1.57
CONST 1994
$
593
MANAGER: M. REYNOLDS (C)
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
474
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$ 119
0TH SHARE$
LIBERTY 541940
FRAN~ COCHRAN OR EXT FM SR 196@ CS 8823 TO US 84@ SR 196 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 1.20 MANAGER! N. PASSMORE (M)
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW 1995 CONST
ONO!R,rAY $ 3100 AFTER H
LIBERTY 570990
THE LIBERTY TRAIL FM RICEBORO, MIDWAY TO SUNBURY RIST SITE BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE : .oo - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. l
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
20
ROW 1994 $
20
CONST 1994 $
85
FED SHARE$
68
GA. SHARE$
8
0TH SHARE$
25
(_
t~F'."l't~II\ PF'.rllllTHF:IIT ()f" TPJ\tl5r0RTI\TtnN STI\TE TRJ\NSPORTI\TION lHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 228
COUNTY P.t.NO,
DESCRIPTION PROJECT DATA
LINCOLN COUNTY OPERATED PUBLIC TRANSIT SERVICE
FISCAL
COST
COMMENTS
YEAR
1!:STS
---------------------------------
2B1148 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 10
FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH
OPERATING 1994 $
25
FUND SOURCE: RURAL TRANSIT
FED SHARE$
15
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SRARE $
10
LINCOLN 2B1149
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1995 $
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
11
LINCOLN 2B1150
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1996 $
27
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
11
LINCOLN 2C2148
ONE CONVERSION VAN "ITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH
CONG DIST, 10
CAPITAL 1994
$
31
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
LINCOLN 2C2149
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LINCOLN MANAGER! STEVE KISH
CONG DIST, 10
CAPITAL 1995
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
LINCOLN 242220
CR 262/NOODLAWN ROAD@ LLOYD CREEK 7 HI SW OF LINCOLNTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : , 20 MANAGER:
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
8
ROW LOCL
CONST 1996 $ 271
FED SHARE$ 216
GA, SHARE$
54
OTR SHARE$
I
t
I
== = ,. .. ~ ~ .~ ~ ~ ~ ~ if'~!~ ~ ~:'.:'.ife1.:c;, ~;.:t~ l!JJtS!~ ~~ 1:._:....:
. .,. '
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 229
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
L-O-N-O------C-O-U-N-T-Y--O--PE-R-A-T-E-D---P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------
581303 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 1
FUNDS RECIPIENT: LONO COUNTY
OPERATING 1994 $
43
MANAGER: STEVE KISR
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADHIN FUNDS
GA. SRAAE $
OTR SHARE$
18
LONO 581304
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: LONG MANAGER: STEVE KISH
CONG DIST. 1 -
OPERATING 1995 $
39
FUND SOURCE: RURAL TRANSIT
FED SRAAI!! $
23
FEDERAL TRANSIT ADMIN FUNDS
GA. SRARI!! $
OTR SHARI!!$
16
LONG 581305
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LONG MANAGER: STEVE KISH
CONG DIST. 1
OPERATING 1996 $
42
FUND SOURCE: RURAL TRANSIT
FED SHAAE $
25
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARI!! $
0TH SHAAE $
17
LONG 5C2303
ONE CONVERSION VAN WITR LIFT AND ONE STANDARD VAN
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LONG MANAGER: STEVE KISH
LONG 54196X
(
SR 196 OVER BEARD'S CREEK/ SEE TATTNALL CO UNKNOWN/ UNIOIONN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 1 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL fflGH"AY ADMIN FUNDS
CAPITAL 1994
$
54
FED SHARI!!$
43
GA. SHARI!!$
6
0TH SHARI!!$
5
Pl!! 1994 ROW 1996 CONST
$
0
$
0
AFTER 96
COUNTY P.l.NO.
LOWNDES 410398
DESCRIPTION PROJECT DATA
I-75 8 SOUTHERN RR; HUD CMI BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: ff. ASHMORE
CF:fllH~ 111 PF:rl\RTMF:IIT or TRIIIISr0RTJ\Tlotl
STATE TRANSrORTJ\TlON IHPROVEHENTS PROGRJ\H
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
SCL RRt SR 38
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 230
FISCAL
COST
YEAR
!STS
------------P-E--1-9-9-2-----UNDERWAY
. ROW NONE $
O
CONST 1994 $ 1439
FED SHARE$ 1151
GA. SHARE$ 288
0TH SHARE$
LOWNDES 410500
I-75 FM NORTH or SR 94 TO COOK COUNTY LINE
RECONSTRUCTION' WIDENING FROH 4 LANES TO 6 LANES. PROJECT MILEAGE : 13.30 MANAGER: H. ASHHORE(H)
CONG DIST. 8 , 2
FUND.SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
LOWNDES 421560
SR 7/US 41 FH CR 267@ DASHER N TO COPELAND ROAD RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.
PROJECT MILEAGE I 3.30 MANAGER: K FULBRIGHT
LOWNDES 421590
SR 7/US 41 FM 1400' NW/SR 376 TO S/JOHNSTON RO RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE I 4.00
MANAGER: K FULBRIGHT
LOWNDES 42172X
SR 94 FH CR 276/BROOKS CO TO E/WITHLACOOCHEE RVR/SEE BROOKS
UNKNOWN/ UNIOIOWN PROJECT- MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: K FULBRIGHT
LOWNDES 42172Y
SR 94 8 LITTLE;WITHLACOOCHEE, OFLW/SEE BROOKS CO
UNKNOWN/ UNKNOWN
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: K FULBRIGHT
'
LOWNDES 422280
SR 125 FH CR 189 TO HOODY AFB NORTH GATE IN VALDOSTA RECONSTRUCTION, WIDENING FROM 4 LANES TO 5 LANES.
PROJECT MILEAGE: 7;38 MANAGER: K FULBRIGHT (M)
CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST .. 2 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 421720 IS .AN ASSOCIATED PROJECT.
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421722 IS .AN ASSOCIATED PROJECT.
CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN.FUNDS
PE 1992 UNDERWAY ROW 1993 UNDERWAY
CONST 1994 $ 4427 FED SRARE $ 3542
GA. SHARE $ 885 0TH SHARE $
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$ 39t7
FED SHARE $ 3158
GA. SHARE $ 789
0TH SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY
$
0
AFTER 96
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
, .. f
41
~
.. ~ . ~{,
~
"
~
=~ ! , I
5ti:1~~
F/~-~e
b:C((.X!.!
1:.c;~~d,
,,J~n~rni
l~iiif.~
l~':'.~!!MI
t~.i.~~J\..::,:,
;,/. --~.;~
.. ,....... ,
!11
f\J'
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
LOWNDES 422360
SR 7/US 41 AT SR 31/US 221 IN VALDOSTA RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .OO MANAGER:
.CONG DIST. 2.
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 231
FISCAL
COST
YEAR
ESTS
P-E---N-O-N-E-----$------O
ROW 1995
$
1
CQNST 1996 $ 116
FED SHARE$
116
GA. SHARE$
OTB SHARE$
LOWNDES 431340
ONE-WAY PAIR ASHLEY, PATTERSON tM N'SIDE OR TO SR 7/US 41 MINOR WIDEN, RESURF / RECST. OR REHAB. PROJECT MILEAGE : .49 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE NONE $
0
ROW 1994 $
1
CONST 1996 $ 200
FED SHARE$ 160
GA. SHARE$
40
0TH SHARE$
LOWNDES 442560
OLD CLYATTVILLE RO/CR 785 FH N/I-75 TON -OF INDUSTRIAL BLVD RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES . PROJECT MILEAGE : 1.80 MANAGER: RAY METTS (H)
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 442565 IS AN ASSOCIATED PROJECT.
PE 1996 ROW LOCL CONST
$
90
AFTER 96
LOffllDES 442565
OLD CLATTVILLE IU>/CR 785 OVER HUD CREEK IN VALDOSTA REPLACEMENT OF THE EXISTING BRIOGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .20 MANAGER: RAY METTS (H)
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 442560 IS AN ASSOCIATED PROJECT.
PE 1996 ROW LOCL CONST
$
10
AFTER 96
LOWNDES 450430
SR 7/US 41 AT JAMES BECK OVERPASS IN VALDOSTA INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE: .20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: J. LINDSEY
CONG DIST. 2
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1994 $
6
CONST 1995 $
50
FED SHARE$
45
GA. SHARE$
5
0TH SHARE$
LOWNDES 450440
GORDON STREET/CR 555/CR 720 FM 8AYTREE RD TON FORREST ST RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.87 MANAGER: RAY METTS (H)
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
96
AFTER 96
LOWNDES 450450
N OM STREET FH BAYTREE ROAD TO GEORGIA AVE. TURN LANES/ TRAFFIC PROJECT MILEAGE : .32 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: J. LINDSEY
I
CONG DIST. 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1995 $ 150
FED SHARE$ 135
GA. SHARE$
15
0TH SHARE$
r.F:nPr.JI\ OF:rl\RTMF:IIT OF' TP/\U~rORTI\TION
STATF: TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
,.r.No.
DESCRIPTION PROJECT DATA
COHMZNTS
L-O-W--N-D-ES---S-T-R--!E-T-S-C-A-P-E-S--D-O-W--N-TO-W-N---V-A-L-D-O-S-T-A-, --P-E-D-/-B-t-iE---P-A-T-R-S--L-ANDSCAPING
471010 MISCELLANEOUS IMPROVEMENTS/ ENRANCEMENT
CONG DIST, 2
PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER!
FUND SOURCE: TRANS, ENHANCE,
FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 232
FISCAL YEAR
COST HTS
PE LOCL
ROW LOCL CONST 1994 $
FED SHARE$ GA, SHARI!! $ 0TH SHARE$
1250 1000
250
'
'* ll
~-a
-~
~
~
~,.
etr:5
~:<n:i
~~.fffr;t
~~~fffl
MJ;~
~~~:~~
flet!fel
~I.Kf!l,
~
f~tp"':.:~;
,,,
GEORGIA DEPAATHENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 / Page 233
COUNTY
DESCRIPTION
FISCAL. COST
P,I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
LU-M--P-K-IN---C-O-U-N-T-Y--O-P-E-R-A-T-E-D--P-U-B-L-I-C--T-R-A-N--SI-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------
1B1033 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 9
FUNDS RECIPIENT: LUMPKIN MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
"OPERATING 1994 $
29
FED SHARE$
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
11
LUMPKIN 1Bl03.
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LUMPKIN MANAGER: STEVE KISH
CONG DIST, 9
OPERATING 1995 $
31
FUND SOURCE: RURAL TRANSIT
FED SHARE$
19
FEDERAL TRANSIT ADMIN FUNDS
GA, SHARE$
0TH SHARE$
12
LUMPKIN 1Bl035
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LUMPKIN MANAGER: STEVE KISR
LUMPKIN 1C2034
ONE CONVERSION VAN WITR LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LUMPKIN MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1996 $
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
20
FEDERAL TRANSIT ADHIN FUNDS
GA, SHARE$
0TH SHARE$
13
C.
CONG DIST. 9
CAPITAL 1995
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
LUMPKIN 122370
SR 52 WB BETNN CR 190, CR 253 (HP 15.B TO 17.4)
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.60 MANAGER: L. OWENS
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
20
AFTER 96
LUMPKIN 132140
OJUILONEGA SOUTH BYP/CR 257 FM SR 9 TO SR 60 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : .90 MANAGER: L. OWENS
LUMPKIN 132290
CR 188/LONG BRANCH RD FM ENO SR 400 TO SR 52 RECONSTRUCTION & WIDENING, NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 4.72 MANAGER: K FULBRIGHT (H)
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW 1994
$
CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0
450
1556 1245
311
PE 1996 ROW CONST
$
40
AFTER 96
AFTER 96
~~nn~JA ~~tARTM~NT OF TRANSPOPTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRJ\H PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 234
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO,
PROJECT DATA
L-U-M--P-K-IN---C-R---81-/-C-L-A-Y---C-REEK FAL-L-S---R-O-@ CLAY CREEK - -----
-
COHHENTS
YEAR
ESTS
-------------------------------------------------------------------
PE 1993 UNDERWAY
170762 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
CONG DIST, 9
ROW LOCL
PROJECT MILEAGE I ,30
-
CONST 1994 $ 235
MANAGER: L. OWENS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 188
FEDERAL RIGH"AY ADHI_N FUNDS
GA, SHARE$
47
0TH ,SHARE$
LUMPKIN BRIDGE REPLACEMENT OVER ETOWAH CREEK BY FOREST HWY
170910 BRIDGES/ REPLACEMENT PROJECT MILEAGE : .00 H.ANAGERt L, OWENS
CONG DIST. 9
FUND SOURCE: FED, LANDS FEDERAL HIGHNAY ADHIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1994 $ 462
FED SHARE$ 462
GA, SHARE$
0TH SHARE$
r.
-
..
~
~
.. ~ ~ ~ i:~~f;~~ . f:t:t~ J,Sr,1t~t:a ~~'$ i%it~ ~:C!S:.t~ tf.9!~ ~ tf.:-5;::;~ !':' .~~ "
- ,.
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATIO'' IMPROVEMENTS PROGRAM
16-Sep-1993 Page 235
PROJECT LISTING BY tOUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
M--A-CO-N-----S-R---26---PA--S-S-IN-G---L-A-N-E-S-@---4--L-O-C--/S-C-H--L-E-Y-,--M-A-C-O-N--c-o-.-.-.-S-E-E--S-C-H-L-E-Y-----------------------------------------------P-E--N-O-N-E-----$------0
32198X UNKNOWN/ 'UNKNOWN
CONG DIST. 2
ROW 1994 $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
GRIP PROJECT
CONST 1995 $
0
MANAGER: GORDON BROWN
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$
321987 IS AN ASSOCIATED PROJECT,
0TH SHARE$
MACON 322280
SR 90@ SCL RR/SANO CRK IN IDEAL;@ SCL RR S/JCT. SR 195
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDEO LANES.
PROJECT MILEAGE I .25 MANAGER: GORDON BROWN
MACON 322290
SR 49/128@ HILLS CREEK E or JCT W/SR 49, 26
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BRONN
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY ROW 1994 $ 170 CONST 1995 $ 1933
FED SHARE$ 1546
GA. SHARE$ 387
0TH SHARE$
PE 1992 UNDERWAY
ROW 1994 $
15
CONST 1994 $ 251
FED SHARE$ 201
GA, SHARE$
50
0TH SHARE$
MACON 370950
ANDERSONVILLE NATL PRISONER or WAR MUSEUM ENTRANCE RD/PARP:IN CONSTRUCTION or NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT HILEAGB : 1.10
MANAGER:
CONG DIST. 2
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS
PE LOCL
ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0 2390 1912
478
MACON 37121X
CR 25 OVER HOGCRAWL CREEK 9 HI WOP' UNADILLA: SEE DOOLY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA, SHARE$
0TH SHARE$
,:~on~,n o~rnPTH~HT OF TRnttsroRTftTION STftTF. TRJ\NSPORTftTION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 236
M-PC-AO-,D!U-I,SN-NOT-ONY--, --S-R--8--FM---C-R--2-2-8-DP-l@El-OS-DJC-EIRA-CIM-TP-OT-NIDO-DA-NT-AH-I-L-L--T-O--C-R--3-9-2-/-D-A--N-I-E-L-S-V-I-L-L-E-/-,--C-L-V-'l'-------------C-O-M-M-E-N-T-S--------------------------FP-EIY-SE-CA1-AR9-L9-2-~. ~-U-NCE-OOS-TES-TRS-ff-AT
122180 RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.
CONQ DIST, 10
ROff
AFTER 96
PROJECT MILEAGE : 5 ,10
CONST
AFTER 96
MANAGER! H. ASHMORE(M)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
122190 IS AN ASSOCIATED PROJECT.
MADISON 122185
SR 8/US 29@ BRUSH CRR, S, FORR BROAD RIVER RERA9, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : ,50 MANAGER: H. ASHHORE(H)
CONG Dl:ST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
Pl!! 1996
ROW NONI!! CONST
$
20
$
0
AFTER 96
MADISON 122190
SR 8/US 29 FH SR 106 TO CR 228@ DIAMOND RILL/INCL CLVT RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.90 MANAGER: H. ASHHORE(H)
MADISON 170786
CR 37@ MASONS HILL CREER 5 HI NE OF DANIELSVILLE
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .20
MANAGER:
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 122180 IS AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: BRIDGE ~ROGRAH FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
Pl!! 1994 $ ROW LOCL CONST 1996 $
FED SR.ME$
GA. SHARE$
0TH SHARE$
1
230 , 1841
416
_t . \
~.
.e:~ = 6Ei!B ~ ,~ , ,.
~~ ~xt:11 ~~~!'$~ r~,.~ ,.,..._ ,,a- ~ f~ i>'"'""""' li!O:$:~ ie:e:e:s~ ~~~ r:~: ..--~
......~;
GEORGIA DEPARTMENT or TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 237
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL . COST
P, I.NO, ,
PROJECT DATA
COMMENTS
YEAR
ESTS
M--A-R-IO--N----S-R -26--W--8--H-P--1-4-.-2--1--2-.7-:-E-B---1-1-.-2--1-2-.-6-:-W--B--3-.-1---4-,6--:E--B--4-.-7---6-,-3-5------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
321982 M>OITION or A PASSING LANE.
CONG DIST. 2
ROW 1993 UNDERWAY
PROJECT MILEAGE: 6.05
GRIP PROJECT
CONST 1995 $ 1933
MANAGER: GORDON BROWN
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 1546
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$ 387
0TH SHARE$
MARION 331610
SR 355@ PINE lrnOT CREEK N OF JCT W/ SR137
REPLACEMENT OF THE EXISTING BRIOGES(S), NO ADDED LANES.
PROJECT MILEAGE 1 ,90 MANAGER! GORDON BROWN
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMlN FUNDS
PE 1993 UNDERWAY
ROW 1995 $
28
CONST 1996 $ 811
FED SHARE$ U9
GA, SHARE$ 162
0TH SHARE$
MARION 342895
CR 128/00YLE ROAD@ OOCHEE CREEK 2.3 Ml Nor SR 26 REPLACEMENT or THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .21 MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
10
ROW LOCL
CONST 1996 $ 363
FED SHARE$ 290
GA. SHARE$
73
0TH SHARE$
r.
COUNTY P,I.NO,
DESCRIPTION PROJECT DATA
r.F:QRG I II PF:r IIRTMF:IIT Of TJlANSf'ORTIIT rm1 STIITF. TRNISrORTIITION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
MCDUFFIE COUNTY OPERATED PUBLIC TRANSIT SERVICE 281153 TRANSIT FACILITIES / OPERATIONS
FUNDS RECIPIENT: MCDUFFIE
MANAGER: STEVE KISH
CONG DIST, 10
FUND SOURCE: RURAL TRANSIT FEDER.AL TRANSIT ADHIN FUNDS
MCDUFFIE COUNTY OPERATED PUBLIC TRANSIT SERVICE 281154 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MCDUFFIE MANAGER! STEVE KISH
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
MCDUFFIE COUNTY OPERATED PUBLIC TRANSIT SERVICE 281155 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MCDUFFIE .MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
-16-Sep-1993 Page 238
FISCAL YEAR
COST ESTS
-
OPERATING 1994 $
68
FED SHARE$
J!I
GA, SHARE$
0TH SHARE$
28
OPERATING 1995 $
70
FED SHARE$
40
GA. SHARE$
0TH SR.ARE$
JO
OPERATING 1996 $
"73
FED SHARE$
42
GA, SHARE$
0TH SHARE$
Jl
MCDUFFIE ONE STANDARD VAN AND ONE MOBILE RADIO 2C2153 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: MCDUFFIE
MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT
CAPITAL 1994
$
21
FED SHARE$
17
FEDERAL TRANSIT ADHIN FUNDS
GA, SHARE$
2
0TH SHARE$
2
MCDUFFIE ONE CONVERSION VAN WITH LIFT AND ONE HOBILE RADIO
2C2154 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: MCDUFFIE MANAGER! ST_EVE KISH .
CONG DIST. 10
CAPITAL 1995
$
JJ
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADHIN FUNDS
GA, SHARE$
4
0TH SHARE$
3
MCDUFFIE SR 17@ BIG BRIER CREEK 221210 REPLACEMENT OF THE EXISTING BRIDCES(S). NO ADDED LANES.
PROJECT MILEAGE: .26 MANAGER: D, GRIFFITH
CONG DIST. 10 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 222590 IS AN ASSOCIATED PROJECT.
PE 1986 UNDERWAY ROW 1987 UNDERWAY CONST 1994 $ 660
FED SHARE$ 528
GA,. SHARE $ 132 0TH SR.ARE$
MCDUFFIE SR 10@ SR 150 NORTH OF THOMSON/ INCL SIGNALS 222240 TURN LANES/ TRAFFIC
PROJECT MILEAGE : ,32 - EXIST, LANES: 2 /PROPOSED LANES: 3 MANAGER: .D. GRIFFITH
CONG DIST, 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
PE NONE $
0
ROW 1994" $
10
CONST 1994 $ 267
FED SHARE$ 240
GA. SHARE$
27
0TH SHARE$
..
~
~
~~ ~
6er~
= ~
~~
h:~
1"1'-"""1"'"'
10.~~~l
r~
~ff~ . ~~
ft,~~1i'.'I:e
:~::: '
..
GEORGIA DEPARTMENT or TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 239
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCIUPTION
FISCAL
COST
P,l,NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
M--C-D-U-F-F-IE---CR---3-0-8--N-"--o-r--T-H-O-M-S-O-N-@---M-I-D-D-L-E--C-R-E-E-K----------------------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY
231180 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDEO LANES.
CONG DIST. 10
ROW LOCL
PROJECT MILEAGE : .11
.
CONST 1995 $ 347
MANAGER: O. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 278
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$
69
231182 IS AN ASSOCIATED PROJECT,
OTR SHARE$
MCDUFFIE CR 308 NORTR OF THOMSON@ MATTOX CREEK 231182 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES,
PROJECT MILEAGE : ,10 MANAGER: D, GRIFFITH
CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 231180 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWA?
ROW LOCL
CONST 1995 $ 211
FED SHARE$ 169
GA. SRA.RE$
42
0TH SHARE$
MCDUFFIE ORIG. TOWN OF tfRIGHTSBORO HISTORIC SITE AND TRAIL 270970 SIGNING/ ENHANCEMENT
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS
PE LOCL
ROW NONE $
0
CONST 1996 $
31
FED SHARE$
25
GA. -SHARE $
0TH SHARE$
6
GF.0RGII\ (lEPAPTHENT OF' Tll.MISPORTI\TIOtl STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY couNTY FY 1994/FY 1996
16-Sep-1993 Page 240
COUNTY P.I.NO.
DESCRIPTION Pll.OJECT DATA
MCINTOSH I-95 FM ALTI\HAHA RVR/GLYNN CO TO l HIN/SR 251
COMMENTS
FISCAL
COST
----- YEAR
ESTS
-----------------P-E---1-9-9-3--- ONDERWAf
511110 RECONSTRUCTION, WIDENING FROH 2 LANES TO 6 LANES,
CONG DIST, 1
ROW NONE $
O
PROJECT MILEAGE: 5,26
CONST
AFTER 96
MANAGER: H. REYNOLDS (H)
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADHIN FUNDS
MCINTOSH I-95 nt 1 HIN/SR 251 TO SR 57 511120 - RECONSTRUCTION, WIDENING FROM 2 LANES TO 6 LANES,
PROJECT MILEAGE : 8.40 MANAGER: H. REYNOLDS (M)
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDER.AL HIGHWAY ADMIN FUNDS
PE 1993 ROW NONE __ CONST
UNDERWAY
$
0
AFTER 96
MCINTOSH I-95 nt SR 57 TO LIBERTY CO LINE 511130 RECONSTRUCTION, WIDENING FROM 2 LANES TO 6 LANES.
PROJECT MILEAGE : 8.26 MANAGER: H. R.EYNOLOS (H)
r.
MCINTOSH SR 25/US 17@ BUTLER RIVER 1 Ht SOUTH or DARIEN 522240 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES,
PROJECT MILEAGE : .80 MANAGER: PETE BLOCKER
CONG DIST. 1 FUND SOURCE: NAT'L HIGHWAY FEDER.AL HIGHWAY ADHIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDER.AL HIGHWAY ADMIN FUNDS
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
PE 1993
ROW 1995 CONST
UNDERWAY
$
5
AFTER 96
MCINTOSH CR 59 E or JCT W/SR 99@ UNNAMED STREAM" 570750 REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDEO LANES.
PROJECT MILEAGE: .20 MANAGER: PETE BLOCKER
MCINTOSH CITY or DARIEN HISTORIC DISTRICT/LANDSCAPE
571020
BICYCLE/PED, FACILITY/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST, 1 FUND SOURCE: BRIDGE PROGRAM FEDER.AL HIGHWAY ADMIN FUNDS
CONG DIST. l FUND SOURCE: TRANS, ENHANCE. FEDER.AL HIGHWAY ADMIN FUNDS
PE 1994 $
10
ROW LOCL
CONST 1996 $ 230
FED SHARE$ 184
GA. SHARE$
46
0TH SHARE$
PE LOCL
ROW NONE $
0
CONST 1994 $ 250
FED SHARE$ 200
GA. SHARE$
0TH SHARE$
50
..
11!e
~
~-
. ~ "
~
~~
~
~ t,R:c.;,SQ.;:I
~
~
~
~..,..,
i=a-"-"'!'1
~
1,:.:.a,
j: ,.::,:
....... .,.
GEORGIA DEPARTMENT or TRJ\NSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 241
COUNTY
DESCRIPTION
FISCAL
COST
P,I,NO.
PROJECT DATA
COMMENTS
YEAR
!STS
--------------------------------------------------------------,--------------------------------------------------------------------
H!RIWETH SR 41 FH SR 85E TO c,G / SEE TALBOT COUNTY
PE NONE $
0
32089Z ADDITION OF A PASSING LANE.
CONG DIST. 2
ROW NONE $
0
PROJECT MILEAGE : ,00
CONST 1994 $
0
MANAGER: GORDON BROWN
FUND SOURCE:SURFACE TRANSPORT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
320892 IS AN ASSOCIATED PROJECT,
0TH SHARE$
H!RIWETH REPLACE SCL RR BR OVER SR 41 W OF WARM SPRINGS/INCL DETOUR
321880 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .25 MANAGER: J. GRAYBEAL(H)
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
H!RIWETH SR 100@ OLLIE BRANCH S OF SR 54 331S30 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .38 MANAGER: GORDON BROWN
H!RIWETR CR 423 N OF JCT W/SR 362@ JARRELL CRK
370870 REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BROWN
CONG DIST, 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 UNDERWAY
ROW 1995 $
10
CONST 1996
$
335:
FED SHARE $ 268
GA. SHARE $
S7
0TH SHARE $
PE 1992 UNDERWAY.
ROW LOCL
CONST 1994 $ 320
FED SHARE$ 256
GA. SHARE $
64-
0TH SHARE$
r.F.0P1~ I fl 1F.rl\RTMF:.,T OF TllAfl.SPORTJ\TlOII STJ\TE TRJ\NSrORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 242
PROJECT L1ST1NG BY COUNTY FY 1994/FY 1996
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
COHHENTS
FISCAL YEAR
COST ESTS
M--IL-L-E-R----S-R---1/-U-S--2--7-@--S-P-R-I-N-G---C-R-E-E-~--------------------------------------------------------------------------------P-E--1-9-9-0
421715 RHAII. OF TH! EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
CONG DIST. 2
ROW NONE
.----------
UNOP.:R"AY
$
0
PROJ!:CT MILEAGE : .50
GRIP PROJECT
CONST 1994 $ 110
MANAGER: M GANNAWAY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 935
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE $ 234
421710 IS AN ASSOCIATED PROJECT.
0TH SHARE $
HILLER 431190
SR 310 FH DECATUR CO LINE TO SR 1/COLOUJTT RECONSTRUCTION, WIDENING. NO LAN! ADDITION PROPOSED.
PROJECT HILEAG! : 7,42 MANAGER: J. LINDSEY
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
ROW CONST
UNDERWAY AFTER 96 AFTER 96
MILLER 470861
CR 183/UNION CH RD@ AYCOC~S CR~ !COUNTY TO DO APPR NOR~)
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1991 UNO!R"AY
ROW LOCL
CONST 1996 $
54
FED SHARE$
43
GA. SHARE$
2
0TH SHARE$
13
..
,.
ff.
~
~
f!e
~ ..
~ . ..1:
~~
~l ~
1\1.':f)~
~.%'.-If,
~~!W
~~
=~ ~
~!!~~
~;&:~
1:~:-: ..~-
..
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-:1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 243
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL COST
P,I.NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
M--IT-C-H-E-L-L--C-R--2-5-0---9--B-IG---SL-O-U-G--H--W-E-S-T--O-F--C-A-M-I-L-L-A----------------------------------------------------------------------P-E--1-9-9-2-----O-N-D-E-R-W-At
470880 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES.
CONG DIST. 2
ROW LOCL
PROJECT MILEAGE : 1,00
CONST 1994 $ 340
MANAGER: J, LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 272
FEDERAL HIGHWAY AOHIN FUNDS
GA, SHARE$
68
0TH SHARE$
MITCHELL RESTORE MITCHELL DRUG STORE/VISITOR CENTER IN CAMILLA 471020 MISCELLANEOUS IHPROVEHENTS / ENHANCEMENT
PROJECT MILEAGE: ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 2
FUND SOURCE: TRANS, ENHANCE, FEDERAL HIGHWAY AOHIN FUNDS
PE 1996 ROW 1996
CONST
$
20
$
45
AFTER 96
r.rnrr~ J II r,rrlll1TMF'.IIT ()f' TPJ\tlSP011TIIT ION STATE TRANSPORTATION IMrROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 244
COUNTY P.I.NO.
MONROE
I-465
FM
I-75
TDPOREOSSCJERRCITP1T9DI/OUANSTA41/-B-I-B-B----------------------------------------C-O-M-M-E-N-T-S--------------------------PF-EIY-SE-CA1-AR9-9L-3- ---
COST ESTS
UNDERWAY
31159X UNKNOWN/ UNKNOWN
CONG DIST. 8
ROW NONE $
O
'PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
O
MANAGER!
FUND SOURCE: I-STATE HAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FONDS
GA. SHARE$
0TH SHARE$
MONROE 31UlX
I-75 UPGRADE REST AREAS 122/ MONROE SEE DOOLY COUNTY UNIOIOWN / UNKNOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
0
ROW NONE $
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
MONROE I-475 RAMPS AT SR 19
,,.
31lUO RAMP/ RECST, OR REHAB,
CONG DIST, 3
PROJECT MILEAGE I .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
PE 1994
$
18
ROW 1995 $
10
CONST 1996
$
600
MANAGER!
FUND SOURCE: I-STATE HAINT.
FED SHARE$ 540
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
60
0TH SHARE$
MONROlr. 311740
SR 408/I-475 NBL @ I-751 ADD ONE LANlr. , REPL BRIDGE DECK
BRIDGlr.S / RECST. OR REHAB. PROJ!:CT MILEAGE : .25 HANAGlr.R:
MONROE 32137X
r
SR 18 BTNN BARNESVILLE, FORSYTH/PASSING, TL, .. SEE LAHAR CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 3 FUND SOURCE: I-STATE HAiNT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 321370 IS .AN ASSOCIATED PROJECT.
PE 1994
$
12
ROW 1995 $
20
CONST 1996 $ 430
FED SHARE$ 387
GA. SHARE$
43
0TH SHARE$
PE 1992 ROW
CONST
UNDERWAY AFTER 96 AFTER 96
MONROE 322360
SR 83 FM S/CR 125/HUBBARD DR NE TO SR 18/US 41 RECONSTRUCTION, WIDENING FROM 2 LANES TO 3 LANES. PROJECT MILEAGE : 1.00 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW CONST
UNDl!:RWAY AFTl!:R 96 AFTl!:R 96
MONROE 332100
SR 87 FROM BIBB CO LINE TO BUTTS CO LINE SHOULDER WORK/ MAINTENANCE PROJECT MILEAGE : 19.00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
304
FED SHARE$ 243
GA. SHARE$
61
0TH SHARE$
,.
..
~
~
. 5.1!!:?1' -~~
~~~
~
~K~
~~
ffl~,fj
~
~
I~)~
f,i:it:.il:/
f~: .. .----~:.:
.. : - :....
.. ..
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 245
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
M--O-N-RO-E----C-R---1-9-3-@---RU-M---C-R-E-E-K---------------------------------------------------------------------------------------P-E--1-9-9-1-----U-N-D-E-R-"-AY
370810 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 3
RO" LOCL
PROJECT MILEAGE: .30
CONST 1996 $ 404
MANAGER: GORDON BROWN
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 323
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
81
0TH SHARE$
MONROE 370811
CR 163/NESTBROOKS RD OVER TOWALIGA RIVER REPLACEMENT OF THE EXiSTING BRIDGES(S). NO ADDED LANES, PROJECT MILEAGE : .50 MANAGER: ooRDON BROWN
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 UNDER"AY
ROW LOCL
CONST 1995 $ 374
FED SHARE$ 299
GA. SHARE$
75
0TH SHARE$
MONROE 370812
CR 152/ENGLISH ROAD OVER RED CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .50 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE:-BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDER"AY:
RON LOCL
CONST 1995 $ 200
FED SHARE$ 160'
GA. SHARE$
40
0TH SHARE$
(
COUNTY P,J .NO,
DESCRIPTION PROJECT DATA
r;F:OPG!A DF:PI\PTMENT OF TRJ\tlSPORTJ\TJON STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTiNG BY COUNTY FY 1994/FY 1996
COMMENTS
HONTGOH! COUNTY OPERATED PUBLIC TRANSIT SERVICE
581308 TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: MONTGOMERY COUNTY MANAGER: STEVE RISH
CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
HONTGOH! COUNTY OPERATED PUBLIC TRANSIT SERVICE 581309 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MONTGOMERY
HANAG!R: STEVE RISH
CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
HONTGOH! COUNTY OPERATED PUBLIC TRANSIT SERVICE 581310 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MONTGOMERY
MANAGER: STEVE RISH
CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
16-Sep-1993 Page 246
FISCAL YEAR
COST !STS
OPERATING 1994 $
37
FED SHARE$
22
GA. SHARE$
0TH SHARE$
15
OPERATING 1995 $
36
FED SHARE$
22
GA. SHARE $ _
0TH SHARE$
14
OPERATING 1996 $
38
FED SHARE$
23
GA. SHARE$
0TH SHARE$
15
HONTGOH! ONE CONVERSION VAN WITH LIFT
5C2308 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: MONTGOMERY
MANAGER: STEVE RISR
CONG DIST. 1
CAPITAL 1994
$
31
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
HONTGOH! 522250
RSREPL1A3C5EMATENTOCoONr EETHECREEEXRISTING
BRIDGES(S).
NO
ADDED
LANES.
PROJECT MILEAGE: .70
MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 522252 IS 1\N. ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1994 $
44
CONST 1994 $ 572
FED SHARE $ 458
GA. SHARE $ 114
0TH SHARE $
MONTGOHE SR 135 AT BUCKHORN CREER NORTH or UVALDA
"522252 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : -.25 MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 522250 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
RON NONE $
0
CONST 1994 $ 337
FED SHARE $ 270
GA. SHARE $
67
0TH SHARE $
HONTGOHE SR 15 BTWN HIGGSTON, TARRYTOWN: NB HP 5.0-6.4:SB e.7-9.7
522520 ADDITION or A PASSING LANE.
PROJECT MILEAGE : 2.40 MANAGER: PETE BLOCKER
CONG.DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1996 ROW CONST
$
27
AFTER 96
AFTER 96
... ..
~
~
!Ht.
~; ~
~ji;t1
~~
~
!1%#i!il
~if~
~
~i
~ii
ru:::z:&-i
;:::-:.
.,.
GEORGIA OEPMTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 247
COUNTY
DESCRIPTION
FISCAL
COST
P, I .NO.
PROJECT DATA
COMMENTS
YEM
ESTS
HORGAN --C-O-U-N-T-Y--O--PE-R-A-T-E-D---P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------
281158 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 10
FUNDS RECIPIENT: MORGAN
OPERATING 1994 $
51
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOHIN FUNDS
FED SHARE$
29
GA. SHARE $
0TH SHARE$
22
HORGAN 2B1159
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HORGAN MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE:: RURAL TRANSIT FEDl!:RAL TRANSIT AOHIN FUNDS
OPERATING 1995 $
53
FED SHARE$
30
GA. SHARE $
0TH SHARE$
23
HORGAN 2B1160
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1996 $
57;
FUND SOURCE: RURAL TRANSIT
FED SHARE$
32
Fl!:DERAL TRANSIT AOMIN FUNDS
GA, SHARE: $
0TH SHARE$
25
HORGAN 2C2158
ONE CONVERSION VAN WITH LIFT ANO ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$
3.
0TH SHARE$
3:
HORGAN 2C2159
ONE STANDARD VAN ANO ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1995
$ u
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17-
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
HORGAN 2C2160
ONE STANOMD VAN ANO ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH
HORGAN 210560
1-20,REST AREA 152,53: REST AREA 162, 63 IN COLUMBIA CO, REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : 2,00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: RON BRAZIEL (C)
CONG DIST. 10 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOHIN FUNDS
CONG DIST, 9 , 10 FUND SOURCE: I-STATE HAINT, F~DERAL HIGHWAY.AOMIN FUNDS
CAPITAL 1996
$
21
FED SHARE $
17
GA. SHARE$
2
0TH SHARE$
2
PE: 1993 UNDERWAY
ROW 1994 $
20
CONST 1995 $ 2252
FED SHARE $ 2252
GA. SHARE $
0TH SHARE $
~F.rip~JA ~F.PARTMF.ttT OF TRANSPORTATION STATF. TRANSPORTATION lMPROVEMF.NTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 248
H-OCP-RO-,IOU-.AN-NNT-OY--, -B-R--ID-G-E--P-A--IN-T-I-N-GD-PR-E-OPSR-CJE-ORC-JIET-PC-T-TIDO-AN-TFO-A-R--FY---1-9-9-4-----D-I-S-T-R-I-C-T--2------------------------C-O-M-M-E-N-T-S--------------------------PF-EIYS-EC-AN-ARO-LN-E-----$-EC-SO-TS-ST--0
21000 BRIDGE PAINTING / MAINTENANCE
CO~G D_IST, 99
ROlf NONE $
0
PROJECT MILEAGE: ,00 - EXIST, LANESr O /PROPOSED LANES: 0
CONST 1994 $ 667
MANAGER r UNKNOWN
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 600
FE~ERAL HIGHWAY ADHIN FUNDS
GA, SHARE$
67
0TH SHARE$
MOROAN SR 83@ HARD LABOR CR~ NW/MADISON 222030 - REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES,
PROJECT MILEAGE : ,38 MANA~ER: D, GRIFFITH
CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FED~IUU. HIGHWAY ADHIN FUNDS
PE 1993 UNDERWAY
ROW.NONE $
0
CONST 1995 $ 1075
FED SHARE.$ 860
GA. SHARE$ 215
OTR SHARE$
MOROAN 270583
CR 38/DOSTER RD@ HARD LABOR CREE~ REPLACEMENT OF THE EXISTINO BRIDGES(S), NO ADDED LANES.
PROJECT MILEAGE : ,51 MANAGER: D, GRIFFITH
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1988 UNDERWAY
ROW LOCL
CONS_T 1994, $ 416
FED SHARE$ 333
GA. SHARE$
83
0TH SHARE$
J,
(_
.. ..
!![@I
~
. ..~
r~
~
~
~ ~~
~t~
Ir('(~
~~~
lf';jjl,;~
--'1.~IJ
P,tim~i (f~::.~~-:ri~~
/;,.,
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 249
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO,
PROJECT DATA
COMMENTS
YEAR
!STS
HU-R-R-A-Y----C-O-U-N-T-Y--O--PE-R-A-T-E-D---P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------
681368 TRANSIT FACILITIES /,OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: HURRAY MANAGER: STEVE- KISH
OPERATING 1994 $
66
FUND SOURCE: RURAL TRANSIT
FED SHARE$
39
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
27
HURRAY 681369
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HURRAY MANAGER: STEVE KISH
CONG DIST, 9
OPERATING 1995 $
70
FUND SOURCE: RURAL TRANSIT
FED SHARE$
41
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
29
HURRAY 681370
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HURRAY MANAGER: STEVE KISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT
OPERATING 1996 $
73
FED SHARE$
u
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
30
HURRAY 6C2368
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HURRAY MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1994
$
28
FUND SOURCE: RURAL TRANSIT
FED SRA.RE$
22
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
HURRAY 620399
SR 52 @ UN RR REHABILITATION OF THE EXISTING BRIOGE(S). NO ADDEO LANES. PROJECT MILEAGE : .. 1 7
MANAGER: BILL MCVEY
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1980 ROW 1995 CONST
UNDERWAY $ 114 AFTER 96
HURRAY 621260
SR 282 RELOCATION FM SR 61/US 411 E TO CR 309 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE: .67 . MANAGER: BILL MCVEY
HURRAY 621265
SR 282/US 76 WB FM HP 5.6 TO HP 6.75 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.15 MANAGER: BILL MCVEY
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST, .9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY
ROW 1995 $
51
CONST 1995 $ 2829
FED SHARE $ 2263
GA, SHARE $ 566
0TH SHARE $
PE 1992
UNDERWAY
ROW 1994
$
35
CONST 1995 $ 1013
FED SHARE $ 810
GA. SHARE $ 203
0TH SHARE $
r.r.rnH; I II r,rr I\RTHF:IIT or Tlll\t1SrORTIIT lPtl STIITE TRJINSPORTIITION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 250
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO,
PROJECT DATA
COHHENTS
YEAR
. ESTS
H-U-R-R-A-Y----S-R--2-2-5--P-A--S-S-IN-G--L-A-N--E-S--@--4--L-O-C-A-T-I-O-N-S-/G-O--R-D-O-N---H-U-R-R-A-Y--,,-S-E-E-. -G-O-R-D-O-N---------------------------------------------P-B--1-9-9-2--- O-N-D--!R-W--AI
UUlX UNltNOWN / UNltNOWN
CONG DIST, .9
ROW
AFTER H
PROJECT MILEAGE: ,00 - EXIST. I.ANESI O /PROPOSED LANES1 0
.
.
CONST
AFTER gg
MANAGER I UNKNOWN .,
FUND SOURCE: SURFACE TRANSPORT,
FEDERAL HIGHWAY ADMIN FUNDS
621630 IS AN ASSOCIATED PROJECT.
HURRAY 121731
SR 2/SR 61@ SUMAC CREEK REHAB, OF THE EXISTING BRIOGE(S), FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : ,00 MANAGER! J, GRAYBEAL
CONG DIST, 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1995 ROif CONST
$
24
AFTER 9S
AFTER.H
HURRAY 141970
SITTON ROAD AT SR 52 ALT, IN CHATSWORTH TURN LANES/ TRAFFIC PROJECT MILEAGE I ,00 - EXIST, LANES! 0 /PROPOSED LANES: 0 MANAGER!
l
HURRAY 670701
CR 23/LOUGffRIDGE RD@ HILL CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES.
PROJECT MILEAGE I ,15 MANAGER: BILL MCVEY
HURRAY 670780
CR 299 OVER EMERY/HOLLY CREEK BRIDGES/ REPLACEMENT PROJECT MILEAGE: .16 MANAGER: BILL MCVEY
CONO DIST, 9
FUND SOURCE: RWY. SAFETY
FEDERAL ffIGfflfAY ADMIN FUNDS
CONG.DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 9 FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1995 CONST
$
10
$
10
AFTER H
PE 1993 ONOERlfAY
ROW LOCL
CONST 1994
$
228
FED SHARE $ 182
GA. SHARE$
46
OTR SHARE$
PE 1994 $
5
ROW LOCL
CONST 1994 $ 463
FED SHARE$ 463
GA, SHARE$
OTR SHARE$
. "
~
~
.E.,~" ~
~fstJ
=....
~
m~~
~~~
~~
/jj;;:-;{;'.~
~
~
r.::::t~ii-'i
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 251
M-PC-UO-,SUC-?ON,-NTG-YOE-E-, -V--E-H-IC--L-E-S-, --C-A-P-,-DP-RHE-OSA-CJIE-NRC-TI-TP.-T,-DIO-AJA-NT-CA-K-,--IM--M-E-R-S-I-O-N--C-L-E-A-N-E-R-,--C-A-M-E-R-A-,--E-T-C-,------------C-O-M-M-E-N-T-S--------------------------F-IYS-EC-AA-R-L-----..--CE-OS-TS-TS--
303013 TRANSIT PROJECTS/ CAPITAL
CONG OIST. 3 , 2
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISR
CAPITAL 1994
$
460
FUND SOURCE: URBAN TRANSIT
FED SHARE$ 368
FEDER.AL TRANSIT ADMIN FUNos
GA. SRARE $
46
0TH SHARE$
46
MUSCOGEE EQUIP, REBUILD, FURNITURE, TIRE LEASE 303014 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGERt STEVE KISH
CONG DIST. 3 , 2
FUNO SOURCE: URBAN TRANSIT FEDER.AL TRANSIT ADMIN FUNDS
CAPITAL 1995
$ 201
FED SHARE$ 161
GA. SHARE$
20
0TH SHARE$
20
MUSCOGEE EQUIP. REBUILD, TIRE LEASE, FUEL BAY CONSTRUCTION 303015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST, 3 , 2
FUND SOURCE: ORBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$ 196
FED SHARE$ 157
GA, SHARE$
20
0TH SHARE$
20
MUSCOGEE PUBLIC TRANSIT SERVICE FOR COLUMBUS AND MUSCOGEE COUNTY 303016 TRANSIT PROJECTS/ OPERATIONS
FUNOS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
'
MUSCOGEE PUBLIC TRANSIT SERVICE FOR COLUMBUS AND MUSCOGEE COUNTY 3D3017 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 3 , 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $ FED SHARE$
GA, SHARE$
0TH SHARE$
2340 725
1615
CONG DIST. 3 , 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ FEO SHARE$
GA. SHARE$ 0TH SHARE$
2434 730
3 1707
MUSCOGEE PUBLIC TRANSIT SERVICE FOR COLUMBUS AND MUSCOGEE COUNTY 303018 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 3 g 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
2531 734 7
1804
MUSCOGEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 3Vl016 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN COLUMBUS MPO AREA
MANAGER: STEVE KISH
CONG DIST. 3 g 2
.
.
CAPITAL 1994
$
39
FUND SOURCE: ELDERLY g DISABLED FUND FED SHARE$
31
F~DERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
OTR SHARE$
4
r.v.np,~ I I\ l"'f.P I\PTMf.NT (')f" TIU\tlSPORTI\T ION
STJ\TF: TRANSPORTATION IMPROVEMENTS PROGRAM
PROJCT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 252
COUNTY P, I.NO,
DESCRIPTION PIWJCT DATA
MUSCOGEE ELDERLY ANO DISABLED VEHICLES ANO EOUIPMENT
FISCAL
COST
COMMENTS
YEAR
ESTS
-----------------------------------------------------~------
lV1017 TRANSIT PROJECTS / CAPITAL
CONG DIST, 3,, 2
FUNDS RECIPIENT: AGENCIES IN COLUMBUS HPO AREA MANAGER! STEVE KISH
CAPITAL 1995
$
FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE $
.FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
41 33
4
0TH SHARE$
4
MUSCOGEE ELDERLY AND DISABLED VEHICLES AND EOUIPHENT
lV1018 TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COLUMBUS HPO AREA
MANAGER: STEVE KISH
CONG DIST. 3, 2
CAPITAL 1996
$
42
FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$
34
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
MUSCOGEE I-185 BR WON, CORRECT s CURVE 9 CUSSETA RD C SCL RR
311155 BRIDGES/ RECST, OR REHAB. PROJECT MILEAGE : ,75 MANAGER:_ N. PASSMORE (H)
COLUMBUS TIP I 91-ST-2001
CONG DIST. J
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW NONE
CONST
UNDERWAY
$
0
AFTER 96
MUSCOGEE 1-185/COLUHBUS FM ST HA.RY'S NORTR TO BUENA VISTA: C JlY440 311440 RECONSTRUCTION C WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE: 1,17 MANAGER: N. PASSMORE
MUSCOGEE I-185/COLUHBUS FM SR 520 TO ST HA.RYS RO [EXCEP 0.43 HILE) 311445 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 2,83 MANAGER: N. PASSMORE (H)
COLUMBUS TIP I 91-ST-2001_ CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP f 91-ST-2001 CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY
ROW NONE $
0
CONST 19~4 $ 1898
FED SHARE $ 1518
GA. SHARE $ 380
0TH SHARE $
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
MUSCOGEE I-185 FH BUENA VISTA RO/COLUMBUS TO MACON RD: C 31Y450 311450 RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.33 MANAGER: N. PASSMORE
MUSCOGEE SR 22 ANO 411 (I-185) ... SLOPE IMPROVEMENTS
311570
PRELIMINARY ENGINEERING/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. GRAYBEAL
t.
COLUMBUS TIP I 91-ST-2001
CONG DIST. 2 & 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 3 FUND SOURCE:. I-STATE HAINT. FEDERAL 'HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY.
ROW NONE $
0
CONST 1994 $ 2692
. FED sHARE $ 2154
GA. SHARE $ 538
0TH SHARE $
PE 1994
ROW 1994 CONST NONE
UNDERWAY
UNDERWAY
$
0
.~
..
~
~
~ ~ ~ ~ JfitNI . ~ , ~ ~~ ~ f~~ lfi:ii::<~'.;;j ~tl:.
r-:
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 253
M-CP-UO-.SU-CI.NO-NT-GOY-EE-, --I--1-8-5---IN-T-E-R-C-H-A-N-DPGR-E-EOS-CJE-ARC-TI-TP-TS-RDIO-AN-T1-A----------------------------------------C-O-L-U-M-B-CU-OS-M-TM-IE-PN-TSI--9-1---S-T---2-0-0-1---------------PF-EIYS-EC-A1-AR9-L9-4-----$-CE-OS-TS-TS-2-61
311630 INTERCHANGE/ RECST. OR REHAB.
CONG DIST. 2
ROW 1996 $ 1500
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
CONST
AFTER 96
MANAGER:
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
MUSCOGEE CALL BOXES ON I-185 FM SR 22/MUSCOGEE TO I-85/TROUP
311720 MISCELLANEOUS IMPROVEMENTS/ NEW CONSTRUCTION
PROJECT HILl!!AOE I ,00 - EXIST, LANES! 0 /PROPOSED LANES! 0
MANAGER:
.
MUSCOGEE I-185/COLUHBUS FH ST MARY'S TO BUENA VISTAt FOR IM$; 311440 31Yt40 UNKNOWN/ UNKNOWN
PROJECT MILEAGE I ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER!
MUSCOGEE I-185 FM BUENA VISTA TO MACON RO; FOR IH FUNDS; SEE 311450 31Yt50 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER!
MUSCOGEE SECOND AVE/COLUMBUS@ C OF GA RR BTWEN 16TH & 17TH STS 321670 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE: .35 MANAGER: BILL MOSKAL
MUSCOGEE SR 1/US 27/4TH AVE/COLUMBUS OVER C OF GA RR 321810 BRIDGES/ RECST. OR REHAB.
PROJECT HILl!!AGI!! : .25 MANAGER: D. CHURCH
MUSCOGEE SR 22 SER RD, LT,RT, WHITESVILLE RD BR TO .1 HI W OF HOON RD 322620 SHOULDER WORK/ MAINTENANCE
PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK
COLUMBUS TIP I 94-0T-2002
CONG DIST. 3 , 7 FUND SOURCE: I-STATE MAINT, FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 2 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 , 3 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 86-UD-3001
CONG DIST. 2 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP f 86-UD-3001 CONG DIST. 2 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 32Y810 IS AN ASSOCIATED PROJECT.
CONG.DIST. 3 FUND SOURCE: NAT'L HIGHWAY ~EDERAL HIGHWAY ADHIN FUNDS
PE 1994
$
u
ROW NONE
$
0
CONST 1996
$
t50
FED SHARE$ t05
GA. SHARE'$
45
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994
$
200
FED SHARE$ 190
GA. SHARE$
20
0TH SHARE$
PE NONE $
0
ROW NONE '$
0
CONST 1994 $ 300
FED SRARE $ 270
GA. SHARE$
30
0TH SHARE$
PE 1993 UNDERWAY ROW LOCL CONST 1995 $ 4702
FED SHARE$ 3762 GA, SHARE$ 940
0TH SHARE$
Pl!! 1992 UNDERWAY
ROW 1995 $ 2262
CONST 1996 $ 4958
FED SHARE$ 3966
GA. SHARE$
9'92
0TH SHARE$
PE NONI!! $
0
ROW 1994
$
0
CONST 1994
$
497
FED SHARE$ 398
GA. SHARE$
99
0TH SHARI!!$
l~f:()JH"; 111 ['lf'.PJ\llTMF'.NT nr TllJ\NSrORTIIT IOU STIITF. TRJ\NSPORTIITION IMPROVF.MEIJTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 254
COUNTY
DESCRIPTION
FISCAL
COST
P, I ,NO,
PROJECT DATA
COMMENTS
YEAR
!STS
M-U-S-CO--G-EE--S--R-1-/U--S-2-7/-4-T-H--A-V-E---IN---C-O-L-, --O-V-E-R--C-O--R-R----E-A-R-L-Y--R-/W---$------------------C-O-L-U-M-B-U-S--T-I-P--f--8-6---0-0---3-0-0-1---------------p-g--N-O-N-E-.---$------O
321810 BRIDGES/ RECST, OR REHAB,
CONG DIST, 2
ROW 1994 $ 786
PRC>.nCT HILEAOE: .00
GRIP PROJECT
.
CONST 1996 $
O
MANAGER! D, CHURCH.
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$-
321810 IS AN ASSOCIATED PROJECT:
OTR SHARE$
MUSCOGEE SR 22 SPUR@ AVALON RO/COLUMBUS . LEFT TURN LANES, SIGNAL 342490 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .20 - EXIST. LANES! 0 /PROPOSED LANES: 0 MANAGER: GORDON BROWN
COLUMBUS TIP f 93-SR-2001 COHO DIST, 3
FUND SOURCE: RWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1995 $ 140
FED SHARE$ 126
GA. SHARE$
4
0TH SHARE$
10
MUSCOGEE SR 22 SPUR/COLUMBUS@ SCRATULGA RD,.(INCL SIGNALS) 342630 INTERSECTION IMPROVEMENT/ TRAFFIC
PRC>.nCT MILEAGE : ,47 - EXIST, LANES! 0 /PROPOSED LANES! 0 MANAGER: GORDON BROWN
MUSCOGEE 13TH STREET BRIDGE OVER CHATTAHOOCHEE RIVER 350260 PRELIMINARY ENGINEERING/ NEW CONSTRUCTION
PROJECT MILEAGE : ,60 - EXIST, LANES1 0 /PROPOSED LANES1 4 MANAGER: BEN BUCHAN_ (M)
COLUMBUS TIP f 93-SR-2004 COHO DIST. 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 78-BR-1001
CONG DIST, 2
FUND SOURCE: BRIDGE PROGRAM FE~ERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1993 UNDERWAY
CONST 1994 $ 1'9
FED SHARE$ 159
GA, SHARE$
30
OTR SHARE$
10
PE 1976 ROW LOCL CONST
ONDERWAY AFTER 96
MUSCOGEE BUENA VISTA RO-PR II FM ANDREA DR TO SCRATULGA RD 350685 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES,
PROJECT MILEAGE : 1,35 MANAGER: BEN BUCHAN (CM)
MUSCOGEE SR 22 SPUR/MACON RO FM RIGDON RD TO CODY RD/EXCP@ I-185 .350690 INTERSECTION IMPROVEMENT/ RECST. OR REHAB,
PROJECT MILEAGE : .65 - EXIST, LANES: 4 /PROPOSED LANES: 6 MANAGER: R, ASHMORE
MUSCOGEE TALBOTTON RD/CS 1854/COLUHBUS FM 7TH AVE TO WOODRUFF/HILTON 350730 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 1,85 MANAGER: D. CHURCH (H)
COLUMBUS TIP I 86-SR-2005
CONG DIST. 3 , 2 FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 86-SR-1001
CONG DIST, 3 , 2 . FUND SOURCE: SURFACE TRANSPORT,
FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 86-SR-2007
CONG DIST. 2 , 3 FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $ ROW LOCL
CONST 1996 $ FED SHARE$
GA. SHARE$ 0TH SHARE$
106
3543 2834
709
PE 1992 ONDERWAY ROW 1994 $ 1500 CONST 1995 $ 1507
FED SHARE$ 1206
GA. SHARE$ 301
OTR SHARE$
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
" ..
~
~
.~<'
~*]
~~~s
~
~~~
,~
-,;.:.=-::.i
~
~
~
i':'.i~~~
r:i: _----::
_.,,
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
MUSCOGEE FORREST RO/COLUMBUS FM TRINITY RO TO TUPELO OR 350780 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.30 MANAGER: BEN BUCHAN (M)
l
COLUMBUS TIP f 79-SR-2003 CONG DIST; 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 255
FISCAL YEM
PE 1992 ROW LOCL CONST
. COST
---- ESTS
UNDERWAY
AFTER 96
MUSCOGEE FORREST RO/COLUMBUS FM FLOYD RD TO SCHATULGA RD 350785 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.90 MANAGER: BEN BUCHAN
COLUMBUS TIP I 79-SR-2016
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
MUSCOGEE ST MARYS RO/CS 2108/COLUMBUS FM BUENA VISTA TO ROBIN RO 350790 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: .75 MANAGER: BILL MOSl':AL
MUSCOGEE BUENA VISTA RO/COLUMBUS FM WYNNTON RO SE TO ILLGES RO 350796 RECONSTRUCTION, WIDENING FROM 2 LANES -TO 4 LANES.
PROJECT MILEAGE: 1.66 MANAGER: BILL MOSKAL (M)
COLUMBUS TIP I 79-SR-2020
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 86-SR-2010
CONG DIST. 2 , 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1996 $ 1580 FED SHAAE $ 1264 GA. SHARE$ 316 0TH SHARE$
PE 1992 ROW LOCL CONST
UNDERWAY
AFTER 96
MUSCOGEE 19TH ST FM 2ND AVE/SR 85 TO TALBOTTON AVE [OLO&NEW LOC) 350800 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .30 MANAGER: BILL MOSKAL (C)
MUSCOGEE SCHATULGA RD/CS 2228 FM BUENA VISTA RD TO MACON RD/SR 22 SP 350850 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.76 MANAGER: BEN BUCHAN (M)
COLUMBUS TIP I 86-IN-4002
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 92-SR-2003
CONG DIST. 2 , 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW LOCL CONST 1995 $
FED SHAAE $ GA. SHARE$ 0TH SHARE$
0
2480 1984
496
PE 1992 ROW LOCL CONST
UNDER"AY AFTER 96
MUSCOGEE FARR RO/CS 392 FH CUSSETA RO/CR 62 TO ST MARY'S RD/CS 2108 350860 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.05 MANAGER: BILL MOSKAL
COLUMBUS TIP I 91-SR-2001
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 ROW LOCL CONST
$
66
AFTER 96
~~0P:1A p~rARTH~NT nr TRANSPORTATION STATE TRANSPORTATION lHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 256
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO.
.
.PROJECT DATA
COMMENTS
YEAR
ESTS
M--U-SC-O--G-EE---SR---22---SP-/-M-A-C-O-N---R-D--F-M--W-O-O-O-R-U-F-F--F-A-R-M--R-D-/-C-R--9-9--T-O--S-R--2-2-/-U-S--8-0--------C-O-L-U-M-B-U-S--T--IP---I -9-3---B-R---1-0-0-2---------.------P-E---19-9-2-,-~--U-N-D-E-R-"A-Y
350870 RECONSTRUCTION, "IDENING FROM 2 LANES TO 4 LANES,
CONG DIST. 3
RO" 1996 $ 3000
PROJECT MILEAG~: 3.43
CONST
AFTER 96
MANAGERt D. CHURCH (M)
FUND SOURCE: NAT'L HIGH"AY
FEDERAL HIGHWAY ADMIN FUNDS
MUSCOGEE SR 22 SP/MACON RO@ BULL CREEK 350875 REHAB. OF THE EXISTING BRIOGE(SI. FROM 2 LANES TO 4 LANES.
PROJECT MILUGE : .02
MANAGERt D. CHURCH (M)
COLUMBUS TIP f 93-BR-1001
CONG OIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
RO" NONE CONST
UNDERWAY
$
0
AFTER 96
MUSCOGEE SR 22 SP FM REESE RD/CS 2111 TO 9'000RUFF FARM RO/CR 99 350880 RECONSTRUCTION, "IOENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 1.67 MANAGER: D. CHURCH (M)
l
MUSCOGEE COMPUTERIZED SIGNAL SYSTEMS CBO COLUMBUS' OTHER SR INTER. 350940 SIGNALS/ TRAFFIC
PROJECT MILEAGE : .Ol - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER1 BURT RIDOLE
COLUMBUS TIP t 92-SR-2001
CONG DIST. 3
FUNO SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 2000 AFTER 96
COLUMBUS TIP I 93-0T-2005
CONG DIST. 3 , 2
FUNO SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
ROW NONE CONST
UNDER"AY
$
0
AFTER 96
MUSCOGEE SOUTH RIVER"ALK BICYCLE/PEDESTRIAN FACILITY IN COLUMBUS 371010 BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: MEG BRYSON
MUSCOGEE BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 3/SEE 37Y040 371040 BRIDGE PAINTING/ MAINTENANCE
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
MUSCOGEE BRIDGE PAIN.TING PROJECT FOR FY 1994 - DISTRICT 3/SEE 371040 37Y040 BRIDGE PAINTING/ MAINTENANCE
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
COLUMBUS TIP t 94-0T-2001
CONG DIST. 2 , 3 FUNO SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNOS
CONG DIST. 99 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 99 FyND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
PE LOCL
RO" LOCL CONST 1996 $
FED SHARE$
GA. SHARE$ 0TH SHARE$
3255 2604
651
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 441
FED SHARE.$ 353
, GA, SHARE $
88
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 564
FED SHARE$ 508
GA. SHARE$
56
O.TH SHARE $
,,
,1.,
..
l!!E ~
~,,
= ~
~~~~,
~~~~
~
~
~
)ii~
= ~
Wit<!ii'$
t~f(J~jj . );)'::.: ;:;.~;
.t~. . . :!
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
NEWTON 210530
I-20@ SR 142/COVINGTON (INCL llf:LOC OF FRONTAGE RD/CR 72) INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE: .OO - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: D. CHURCH
CONG DIST. 10
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS
'
16-Sep-1993 Page 257
FISCAL.
COST
YEAR
ESTS
P-E---1-9-9-3-----U-N-DE-R-W--AY
ROW
AFTER 96
CONST
AFTER 96
NEWTON 210640
I-20 AT GA. RR, ALCOVY RD, ALCOVY RVR, OVERFLOW BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:
NEWTON 222040
SR 36/COVINGTON FM OLD MONTICELLO RD TO CR 348/PETTY ST TURN LANES/ TRAFFIC PROJECT MILEAGE : 1.10 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH
NEWTON 231290
SR 36@ CR 653/JACRSON ROAD (COVINGTON BYPASS) INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .38 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH
NEWTON 241980
SR 12@ SR 142 (TURN LANES, UPGRADE TRAFFIC SIGNAL) INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .30 - EXIST. LANES: 2 /PROPOSED I.ANS~: 3 MANAGER: D. GRIFFITH
N'9TON 242100
SR 162 Q CR 29/RIRRLAND RD ANO CR 393/0LD CONCORD RO INTRSECTION IMPROVEMENT/ TRAFFIC PROJECT MILAGE: .43 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GRIFFITH
NEWTON 73090X
SR 20 FM SR 212/NEWTON N TO HONEY CREER RO/SEE ROCKDALE CO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. CHURCH
CONG DIST. 10 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN .FUNDS
CONG DIST. 10 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 231290 IS AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 222040 IS AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 4 FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP IR 028 CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 730907 IS AN ASSOCIATED PROJECT.
PE 1994
$
ROW NONE $
CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
84 0
2812 2531
281
PE 1993
UNDERWAY
ROW 1994
$
50
CONST 1996 $ 1054
FED SHARE$ 949
GA. SHARE $ 105
0TH SHARE$
PE 1994 $
10
ROW LOCL
CONST 1996 $ 230
FED SHARE$ 207
GA. SHARE$
23
0TH SHARE$
PE 1992 UNDERWAY
ROW LOCL
CONST 1994 $ 517
FED SHARE$ 465
GA. SHARE$
52
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 327
FED SHARE$ 294
GA. SHARE$
33
0TH SH.ARE$
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
,:,=-,,pr: I" r,r.rllPTl-lf.llT r,r TRIIIISrORTIITIOII STIITE TIU\NSPORTI\TlON IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 258
COUNTY
DESCRIPTION
FISCAL
COST
P,!,NO,
.PROJECT DATA
COMMENTS _
YEAR
. ESTS
O--C-O-N-!-! ---S-R--1-0-/-U-S--7-8--M--O-N-R-O-! -T-O---A-T-H-E-N-S--M-E-D-IA-N---O-P-!N--IN-G--1 --S-E-E--W-A-L-T-O-N--------------------------------------------------P-E--1-9-9-4-.----$------O
12257X UNltNOWN / UNltNONN
CONG pIST, 10
ROW NONE $
O
PRO~CT HILEAGE t .00 - EXIST, LANES! 0 /PROPOSED LANES: 0
CONST 1994 $
O
MANAGER: UNKNOWN
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$
0TH SHARE$
OCON!! 132340
SR 10 FM ALCOVY RIVER/WALTON TRRU OCONEE TO SR .8/CLARKE
GUARDRAIL/ TRAFFIC
,
PRO~CT HILEAGE I 10,10 - EXIST, LANES! 4 /PROPOSED LANES: 4
MANAGER! L, SEABROOK
PE 1994 $
25
CONG DIST, 10
ROW NONE_ $
0
CONST 1996 '$ 830
FUND SOURCE: NAT'L RIGRWAY
FED SHARE$ 830
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$
13234X IS AN ASSOCIATED PROJECT,
0TH SHARE$
OCONEE 150210
.CR 473/EPPS BRIDGE RD FH SR 10 TO SR lOBUS/US 78/CLAAAE CO RECONSTRUCTION I WIDENING FROM 2 LANES TO 4 LANES,
cc, PROJECT MILEAGE t 3.30
MANAGER I H. ASHMORE
ATHENS TIP f II-03 CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 150215 IS AN ASSOCIATED PRO~CT.
PE 1992 ONDERWAY ROW ,1994 $ 2700 CONST 1995 $ 10373
FED SHARE$ 8298
GA. SHARE$ 228
0TH SHARE$ 1847
. OCON!! 150215
EPPS BRIDGE RD@ MCNUTT CM/ALSO CLARi! CO REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES .
PROJECT MILEAGE I .50 MANAGER: H. ASHMORE (C)
ATHENS TIP f iI-03 CONG DIST. -10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 150210 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 896
FED SRARE $ 717
GA, SHARE$ 179
0TH SHARE$
-~ ~
*,.
~
~
t~~:~ == ~
~
~J
~
~]?~~
~
~~
~
~~
~~
JM~~~~
1,:~.,;_ ::;'
.. .:
,
GEORGIA DEPI\RTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 259
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,l,NO,
PROJECT DATA
COMMENTS
YEM
l!!STS
O-2C-2L-2l-0!!5-TH0-O-R--RS-RE-P-L-7A7-C-E-EM-A-ESNT--T-o-or-r-L-ET-HX-EIN--GE-TX-OI-SN-T@-IN-G-B-IG-B-R-IIN-O-DG-IA-E-NS-(S-C)-R.-E-EN-KO--A-D-D-E-O--L-A-N-E-S-,-----------C-O-N-G--D-I-S-T-.--1-0--------------------------R-OP-WE--11-99-99-43-----U$-N-D-ER-W--AY1
PROJECT MILEAGE : ,JO
CONST 1995 $ 397
MANAGER: 0, GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 310
(
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$
77
222052 IS AN ASSOCIATED PROJECT.
0TH SHARE$
OCLl!!THOR SR 77 EAST or LEXINGTON@ LITTLE INDIAN CRF.ER 222052 REPLACEMENT or THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : ,55
MANAGER! 0, GRIFFITH
CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 222050 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW 1994
$
500
CONST 1995 $ 410
FED SHAil!!! $ 328
GA. SHARE $
82
0TH SHARE$
OCLETHOR CULVERT EXT@ VAR LOC ON STATE ROUTES,,GREENE/TALIAF
27087X BRIDGES/ MAINTENANCE PROJECT MILEAGE : ,00 MANAGER: L, SEABROOK
PE NONE $
0
CONG DIST. 2
ROW 1994 $
0
CONST 1994 $
0
FUND SOURCE: SURFACE TRANSPORT,
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SRARE $
270870 IS AN ASSOCIATED PROJECT.
0TH SHARE$
i:F:nRGIJ\ l>EPJ\PTMENT Of' TRJ\tlSPC>RTJ\TION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 260
P-ACP-OO-.IU-L.NO-NT-IONY-G-. -C-O-U-N-T-Y--O--PE-R-A-T-E-D-DPR-E-OPS-UCJE-BRC-LI-PTIC-T-IDO-ATN-TR-AA-N-S-I-T--S-E-R-V-I-C-E----------------------------------C-O-M-M-E-N-T-S--------------------------F-IY-SE-CA-AR-L--
COST ESTS
681373 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 7
FUNDS RECIPIENT: PAULDING MANAGER: STEVE KISH
OPERATING 1994 $
54
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
31
GA. SHARE$
0TH SHARE$
23
PAULDING COUNTY OPERATED PUBLIC TRANSIT SERVICE 681374 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: PAULDING MANAGER: STEVE KISH
CONG DIST. 7
OPERATING 1995 $
56
FUND SOURCE: RURAL TRANSIT
FED SHARE$
32
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
24
PAULDING COUNTY OPERATED PUBLIC TRANSIT SERVICE 681375 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: PAULDING MANAGER: STEVE KISH
CONG DIST. 7
,
FUND SOURCE: RURAL TRANSIT
OPERATING 1996 $
58
FED SHARE$
33
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
25
PAULDING ONE STANDARD VAN 6C2373 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: PAULDING
MANAGER: STEVE KISH
CONG DIST, 7
CAPITAL 1994
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
PAULDING SR 61/DALLAS@ SOUTHERN RR 620834 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
PROJECT MILEAGE: .38
MANAGER: BILL MCVEY
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1994 $ 1175 CONST 1995 $ 1308
FED SHARE $ 1046
GA. SHARE $ 262 0TH SHARE $
PAULDING SR 92@ LICK LOG CREEK 621020 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .50
MANAGER: BILL MCVEY
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 UNDERWAY ROW 1988 UNDERWAY CONST 1994 $ 554
FED SHARE $ 443
G~. SHARE $ 111 0TH SHARE $
PAULDING SR 92@ SCL RR 621022 REHAB. OF THE EXISTING BRlDGE(S). FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .13 MANAGER: BILL MCVEY (M)
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
..,
., ...
~
es
~ .- ,,
~
~i~
~
~-
~
~
~
~
~
~~
r.,-:, "-':::
~~,
...
GEORGIA DEPhRTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 261
COUNTY
DESCRIPTION
FISCAL COST
P,l,NO,
PROJ!:CT DATA
COMMENTS
YEAR
ESTS
PA-U--LD--IN-Q--S-R---1-2-0--FM---SR---6-/U--S--2-7-8--N-E--T-O--T-H-E--C-O-B-B--C-O--L-I-N-E-------------------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-WAY
621150 RECONSTRUCTION, WIDENING .FROM 2 LANES TO 4 LANES.
CONG DIST. 7
ROW 1992 UNDERWAY
PROJECT MILEAGE : 4,28
CONST 1996 $ 9478
MANAGER: RON BRAZIEL
FUND SOURCE: SURFACE TRANSPORT;
FED SHARE$ 7582
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE'$ 1896
0TH SHARE$
PAULDINQ SR 61/DALLAS FH SR 120 CONN TO SR 6/US 278 621570 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.20 MANAGER! RON BRAZIEL (H)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$
59
AFTER 96
AFTER 96
PAULDING SR 120 9 3 LOC IN HARALSON, PAULDING co ... SEE HARALSON
62158X UNl':NOWN / UNKNOWN PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
PAULDING CR 440/CR 470/CR 441 FM CR 168 TO SR 6/PAULDING .. SEE POLK 631141 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNl':NOWN
PAULDING SR 61@ CR 341/LEFT TL@ ML 9.99tREHOVE RR BR TO @GRADE XING 641830 BRIDGE ltEHOVAL / TRAFFIC
PROJECT MILEAGE : .17 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: BILL MCVEY
PAULDING SR 92 AT SR 120 CONNECTOR IN HIRAM 641980 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 621580 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 631148 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: RWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
PE 1992 ROW CONST
UNDERWAY
AFTER 96 AFTER 96
PE 1993 UNDERWAY
ROW LOCL CONST 1995
$
. 228
FED SHARE$ 205
GA. SHARE$
23
0TH SHARE$
PE 1994 $
9
ROW 1995 $
10
CONST 1996 $ 289
FED SHARE$ 260
GA. SHARE$
29
0TH SHARE$
1.
COUNTY P,I .NO,
DESCRIPTION PROJECT DATA
~~OPGIA u~rAPTHENT OF TRANsrnRTATION STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
PEACH 381233
COUNTY OPERATED PUBLIC TRANSIT SERVICY. TRANSIT FACILITIES/ OPERATiONS FUNDS RECIPIENT: PEACH MANAGER: STEVE KISH
W. ROBINS TIP I
CONG DIST. 2 , 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
PEACH 381234
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PEACH MANAGER! STEVE KISH
W. ROBINS TIP I
CONG DIST, 2 , 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
PEACH 381235
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PEACH MANAGER: STEVE KiSH
W. ROBINS TIP t
CONG DIST. 2 , 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
PEACH 3C2234
ONE CONV. VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PEACH MANAGER: STEVE KISH
W, ROBINS TIP t
CONG DIST. 2 , 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
PEACH 311540
1-75@ SR 96 INTERCHANGE/ llECST. OR REHAB. PROJECT MILEAGE 1 1.00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER! RON BRAZIEL (HI
CONG DIST, 2
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 262
FISCAL YEAR
COST ESTS
OPERATING 1994
$
0
FED SHARE$
29
GA. SHARE$
0TH SHARE$
20
OPERATING 1995
$
51
FED SHARE$
30
GA. SHARE$
0TH SHARE$
21
OPERATING 1996 $ FED SHARE$ GA, SHARE$
0TH SHARE$
54 .,
32 22
CAPITAL 1995
$
54
FED SHARE$
43
GA. SHARE$
6
0TH SHARE$
5
PE 1993 ROW 1995 CONST
UNDERWAY
$
912
AFTER H
PEACH 311780
1-75: CR 182/WHITE ROAD OVER I-75 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : ,00 MANAGER!
PEACH 320960
SR 96/VINEVILLE ST FM CAMPUS ST/CR 617 TO ANDERSON ST/CS 621 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES,
PROJECT MILEAGE _: 1 , 13 MANAGER: GORDON BROWN
CONG DIST. 3 FUND SOURCE: I-STATE HAINT, FEDERAL HIGHNAY ADHIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FED_ERAL HIGHNAY ADHIN FUNDS
pg 1994
$
ROW 1995 $
CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
10 1.
139 125
14
PE 1992 UNDERWAY ROW 1995 $ 1175 CONST 1996 $ 757
FED SHARE $ 606 GA. SHARE $ 151 0TH SHARE $
..
..
~t
II
ffie
~
~
~
~ffl
~
~~
~~-
~
~
~
~
~
.~;~~~. ::~!
c:
GEORGIA DEPMTHENT OF TRANSPORTATION STATE TRANSPORTATION IHPROVEHENTS PROGRAM
16-Sep-1993 Page 263
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL . COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-PE-A-C-H-----S-R--2-4-7---C---FH---SR---4-9--T-O--I--7-5-/-I-N-C--L--P-A-A-A-L-L-E-L--B-R-@---S-O-U-T-H-E-R-N--R-R-------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
321660 RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.
CONG DIST. 2 ' 3
ROW 1996 $ 614
PROJ!:CT MILEAGE: 3.00
CONST
AFTER 96
MANAGER: H, ASHMORE
FOND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADHIN FUNDS
PEACH 322380
SR 49@ BIG INDIAN CRK SW or FORT VALLEY REPLACEMENT or THE EXISTING BRIDGES(S). NO .ADDEO LANES.
PROJ!:CT MILEAGE: ,45
MANAGER: GORDON BROWN
Pl'!ACH 331940
SR 42 rH NEAR OLD FT VALLEY RD EAST TO SR 49 SW OF CHURCH ST
CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : ,47 MANAGER! GORDON BROWN
PEACH 371250
FORT VALLEY DEPOT, LANDSCAPING, PEDESTRIAN WAYS MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 3 , 2 FUND SOURCE: BRIDGE -PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY .ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$
5
CONST 1995 $ 608
FED SHARE $ 486
GA. SHARE $ 122
0TH SHARE $
PE 1993 UNDER"AY
ROW 1995 $
32
CONST 1996
$
530
FED SHARE $ 424
GA. SHARE $ 106
0TH SHARE $
Pl!: 1996
$
20
RO" 1996 $
86
CONST 1996 $ 175
FED SHARE$ 140
GA. SHARE$
21
0TH SHARE$
56
GF:UR1;111 flF:PflRTHF:NT or TRJ\ll!':rORTflTION
STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 264
COUNTY P.1.NO.
PICUNS
COUNTY
OPERATEDDPREPOSUCJEBRCLITPICTIDOATNRTAANSIT--S-E-R--V-IC-E----------------------------------C-O-M--M-E-N-T-S-------------------------F-IY-SE-CA-AR-L----.
COST ESTS
SB1J78 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: PICKENS MANAGER: STEVE ~ISR
OPERATING 1994 $
'6
FUND SOURCE: RURAL TRANSIT
FED SHARE$
39
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
27
PIC~ENS SB1J79
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PICKENS MANAGER: STEVE RISH
CONG DIST. 9
OPERATING 1995 $
69
FUND SOURCE: RURAL TRANSIT
FED SHARE$
u
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
28
PICKENS SBlJB0
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PICUNS MANAGER! STEVE RISH -
CONG DIST. 9
OPERATING 1996 $
72
FUND SOURCE: RURAL TRANSIT
FED SHARE$
42
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$
0TH SHARE$
29
PICKENS 6C2J78
TWO CONVERSION VANS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PICUNS MANAGER1 STEVE RISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
CAPITAL 1994
$
56
FED SHARE$
45
GA. SHARE$
5
0TH SHARE$
6
PICKENS 621490
SR 53 FM SR 515/APD TO CR 243/INDUSTRIAL BLVD RECONSTRUCTION, WIDENING FROM 2 LANES TO 3 LANES. PROJECT MILEAGE : 1.40 MANAGER1 R FULBRIGHT (M)
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
PICKENS 621640
SR 53 EB HP 7.25-8.4: WB HP 8.4-10.05 ADDITION OF A PASSING LANE. PROJECT MILEAGE: 2.70 MANAGER: BILL HCVEY (H)
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 278 AFTER 96
PICKENS 621830
SR 53 AT SPRING STREET IN JASPER INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS
PE NONE $
0
ROW 1995 $
1
CONST 1996 $
40
FED SHARE$
40
GA. SHARE$
0TH SHARE$
,_<
..
~
fffSffl
= ~ ,,~
~
~
~
~ ~
~-~
~
r~ n-=iw
~
14;-:,:i~
,;.,; ;'.:--.j
'
,,
GEORGIA DF.P~TMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 265
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL COST
P,I.NO.
PROJECT DATA
COMMENTS
YEAR
!STS
-PI-C-K-E-N-S---S-R---5-1-5--FM---C-R--3-0-0--(-P-IC-K--E-N-S-)--T-O--U-N-I-O-N--C-L---A-N-D--F-A-N-N-I-N-/-G-IL-M--E-R------------------------------------------------P-E--N-O-N-E-----$------0
S70800 RIDING SURFACE RERABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST, 9
ROW NONE $
0
PROJECT MILEAGE : 48,26 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $ 1823
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT,
FED SHARE$ 1458
FEDERAL HIGHWAY ADHIN FUNDS
GA, SHARE $
3g5
67080X IS AN ASSOCIATED PROJECT.
0TH SHARE$
(
COUNTY ,.1.No.
DESCRIPTION PROJECT DATA
r.F:nRr.111 f:lF:r/\PTMENT OF TR/\tlSPORT/\TlON ST/\TF, TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
Pl!RC! 5B1313
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PIERCE MANAGER: STEVE KISH
CONG DIST, 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
PIERCE 5B1314
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: .PIERCE MANAGER: STEVE KISH
CONG DIST, 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
Pl!RCE 5B1315
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PIERCE MANAGER: STEVE KISH
PIERCE 5C2313
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PIERCE MANAGER: STEVE KISH
CONG DIST. l
FUND SOURCE: RURAL TRANSIT
(.
FEDERAL TRANSIT ADMIN FUNDS
CONG DIST. l
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
PIERCE 521710
SR 15/121@ UNNAMED STRH:ALABMA RVR, OFL";TAN TROUGH CRK
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .80 MANAGER: PETE BLOCKER
CONG DIST, 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PIERCE . 531280
SR 203@ ALABAHA RIVER OFLW NW/BLACKSHEAR
REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PIERCE 531285
SR.203@ ALABAHA RIVER NW/BLACKSHEAR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: PETE BLOCKER
. . CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FED~RAL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 266
FISCAL YEAR
COST ESTS
- .- -------
OPERATING 1994 $
39
FED SHARE$
23
GA, SHARE $
0TH SHARE$
u
OPERATING 1995
$
41
FED SHARE$
24
GA. SHARE$
0TH SHARE$
1'1
OPERATING 1996 $
43
FED SHARE$
25
GA, SHARE$
0TH SHARE$
18
CAPITAL 1994
$
28
FED SRARE $
22
GA. SHARE$
3
OTR SHARE$
3
PE 1989
UNDER"AY
ROW NONE $
0
CONST 1994 $ 2344
FED SHARE $ 1875
GA. SHARI!: $ 469
0TH SHARE $
PE 1993 UNDER"AY
ROW 1994
$
5
CONST 1995 $ 386
FED SHARE $ 309
GA, SRARE $
77
0TH SHARE $
PE 1993 ONDER"AY
ROW 1995 $
1
CONST 1995 $ 745
FED SHARE $ 596
GA, SHARE $ 149
OTR SHARE $
.. ..
~
~ . ~.,
~m
~
~s~
~ IJ,~
~~
~_j.!{d
~=~,
~
~
~~
i?.i:.:f:~t~
. :_:.:;;-
.. f :
GEORGIA DEPARTMENT orTRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 267
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL . COST
P, I.NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
-PI-E-R-C-E----S-R---15--O--V-ER---B-U-R-N-EY---B-R-A-N-C-H--IN---B-L-A-C-~-S-H-E-A-R-------------------------------------------------------------------P-E--1-9-9-4-----$------10
532470 R.!PLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LAtfES.
CONG DIST. 1
ROW 1996 $
l
PROJECT MILEAGE: .00
CONST
AFTER 9fi
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADHIN FUNDS
C.
1:F:()J~r, I I\ PF:Pl\llTMF:NT OF TPAflSrORTI\T IOtl STI\TE TRNISPORTI\TlON IMPROVEMENTS PROGRAM PROJECT LISTING BY .COUNTY FY 1994/FY 1996
16-Sep-1993 Page 268
P-CP-IOK-,IU-!,N-NT-OY--, -R--E-A-L-IG-N---SR---3-6-2-/DPW-RE-IOSL-CJL-ER-ICIA-TP-HT-SIDO-OA-NTN-A@---Z-E-B-U-L-O--N-tP-I-N-E-:H-A--R-V-A-R-O-------------------------C-O-M-M-E-N-T-S--------------------------FP-IEY-SE-CAN-ARO-LN-E--~-$-CE-SO~TS-ST--O
322100 RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED.
CONG DIST, 3
RON 1994 $ 386
PROJECT MILEAGE : ,31
CONST 1994 $ 371
MANAGER! GORDON BROWN
FUND SOURCE: SURFACE TRANSPORT,
FED SHARE$ 297
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
74
,OTR SHARE $
PIU 363720
CR 160/ROBERTS QUARTERS ROAD: OVER ELKINS CREER
REPLACEMENT OF THE EXISTING BRIOGES(S), NO ADDEO LANES,
PROJECT MILEAGE: .oo
l
HANAGER1
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
ti
RON LOCL
CONST 1995
$
382
FED SHARE$ 30ti
GA, SHARE$
76
OTR SHARE$
PIKE
3707U
CR 51 9 NN CTY LIMITS/ZEBULON 9 ELKINS CREER
REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDEO LANES,
PROJECT MILEAGE: .oo
HANAG!R1 GORDON BROWN
CONG DIST, 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PB 1994 $ ROW LOCL CONST 1995 $
FED SHARE$ GA, SHARE$
OTR SHARE$
5
325 260,
ti5
f
. ,
..
eme
~
~ ~e
,.
J
,
~
~
~
l'=m,;I
~
-=.i;i
u;:.-2.,!J
= -
~...:!~ !il"..-.~.:id tr~-:'c -~i
,>
COUNTY P, I.NO,
DESCRIPTION PROJECT OAT.I\
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
POLK 6B1417
CITY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF CEDARTOWN MANAGER: STEVE KISH
CONG OIST, 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
POLK 6B1418
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF CEDARTOWN MANAGER: STEVE KISH
CONG OIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
16-Sep-1993 Page 269
FISCAL . COST
YEAR
ESTS
------------------
OPERATING 1994 $
22
FED SHARE$
13
GA. SHARE $
0TH SR.ARE$
9
OPERATING 1995 $
30
FED SHARE$
17
GA. SHARE$
0TH SHARE$
13
POLK 691419
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF CEDMTOWN MANAGER: STEVE KISH
CONG OIST. 7
OPERATING 1996 $
32
FUND SOURCE: RURAL TRANSIT
FED SR.ME $
19
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
14
POLK 6C2417
ONE STANDARD VAN ANO ONE MOBILE RADIO TRANSIT.FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF CEOARTOtm MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1994
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE $.
17
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
2
0TH SHARE $.
2
POLK 620645
SR 6 FH OLD CEDARTOWN RO/CR 193 E TO SR 101 IN ROCRHART RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.27 MANAGER: RAY METTS (H)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST .
UNDERWAY
$ 2500 AFTER 96
POLK 620647
SR 6 rH CR 154 EASTERLY TO OLD CEDARTOWN RO/CR 193 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.60 MANAGER: RAY METTS (HI
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHNAY ADMIN FUNDS
pg 1992
ROW 1996 CONST
UNDERWAY
$ 892 AFTER 96
POLK 621420
SR 113 FM ROCKMART BYP/CR 433 TO TAYLORSVILLE CTY LMT/CR 249 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.50 MANAGER: M GANNAWAY (Cl
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHNAY ADMIN FUNDS
PE 1993 ROW 1995 CONST
UNDERWAY $ 2006 AFTER 96
GEORGIA PEPARTHEIIT Of TP~N$PORTATION STATE TRJ\NSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 270
COUNTY
DESCRIPTION
FISCAL
COST
p, I.NO.
PROJECT DATA
COMMENTS
YEAR
.. ESTS
PO-L-K------S-R---11-3--r-H--T-A--Y-L-O-R-S-V-I-L-L-E--C-L--T-O--C-R--3-1-/S-T-I-L-E-S-B--O-R-O--,,-S-E-E--B-A-R-T-O-"------------------------------------------------P-E--N-O-N-E-----$---- O
Ul43X UNKNOWN / UNKNOWN .
CONG DIST, 7
RO" 1994 $
O
PROJECT MILEAGE : 4.59 - EXIST. LANES: 0 /PROPOSED .LANES: 0
CONST
AFTER 96
MANAGER: M GANNAWAY
FUND SOURCE: SURFACE TRANSPORT,
FEDERAL RIGRWAY ADMIN FUNDS
621430 IS AN ASSOCIATED PROJECT,
POLK 621470
SR 1/US 27 OVER CEDAR CREEK NEAR CEDARTOWN REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 5 LANES,
PROJECT MILEAGE : ,21 MANAGER! J. GRAYBEAL
CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1996 $ 293
FED SHARE$ 226
GA, SHARE$
57
0TH SHARE$
POLK 621475
SR 1/US 27: BRIDGE OVER CEDAR CREEK TRIBUTARY SE CEDARTOWN REHAB, OF TRE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE: ,00 MANAGER! J, GRAYBEAL
CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGH"AY AOHIN FUNDS 621325 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1996 $ 133
FED SHARE $ 10,
GA. SHARE OTH.SHARE
$ $
27.
POLK 62Y645
PART or R/W $ FOR 620645
UNKNOWN/ UNltNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST, 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONI!: ROW 1996 CONST N(!NE
$
0
$ 1000
$
0
POLK 631149
CR 440/CR 470/CR 441 FM CR 168/POLK TO SR 6/US 278/PAULDING RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE: 6.53 MANAGER: BILL MCVEY (H)
CONG DIST; 7
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AFTER 96 AFTER 96_
POLK 631UX
CR 342/CR 440 FH CR 345/HARALSON TO CR 168/POLK-SEE HARALSON UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
POLK 63118X
SR 100 CLVT WON FH TALLAPOOSA TO CEDARTOWN .. ,SEE HARALSON UNKNOWN/ UNKNOWN PROJECTHILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 631145 IS AN ASSOCIATED PROJECT.
CONG DIST, 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 631180 IS AN ASSOCIATED PROJECT ..
PE 1992 ROW CONST
PE_ 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
UNDERWAY AFTER 96 AFTER 96.
.,, ..
4
'I
~
~
,. = ~
~.,
~
~
~
f~~ll ~
~
~
/i.1-i1$.'.~ .~:.:a~
:.::-::<'::1
,,
,:
GEORGIA OEPARTMENT OF TllANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-19H Page 271
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
POLK
CR 439/LIHE BRIDGE ROAD OVER McCUR.RY CREEK
FISCAL
COST
COMMENTS
YEAR
ESTS
----------------------P-E--1-9-9-3-----U-N-O-E-R-"A-Y
631280 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES,
CONG DIST. 7
ROW LOCL
PROJECT MILEAGE : 10
CONST
AFTER 9ti
MANAGER: BILL MCVEY
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
POLK
641880
SR lBUS, FM PLANTATION AVE TO SOUTH OF CEDERTOWN BYPASS TURN LANES/ TRAFFIC PROJECT MILEAGE 1 1,08 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER! BILL MCVEY
POLK 670540
CR 450/N CAVE SPRING ST/CEDARTOWN@ SKEETER CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .17 MANAGER! BILL MCVEY
POLK 670676
CR 6/LAJtE CREEK RD@ LARE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: BILL MCVEY
POLK 670900
OLD CSX RAILROAD CORRIDOR FROM CEDARTOWN TO ALABAMA BICYCLE/Pim. FACILITY / ENHANCEMENT PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 7 GRIP PROJECT FUND SOURCE: NAT'L HIGH"AY FEDERAL HIG~WAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
13
ROW 1995 $
5
CONST 1996 $ 435
FED SHARE$ 435
GA. SHARE$
0TH SHARE$
PE 1994 $
5
ROW LOCL
CONST 1996 $ 210
FED SHARE$ 168
GA. SHARE$
42
0TH SHARE$
PE 1991 ONDER"At
ROW LOCL
CONST 1994 $ 321
FED SHARE$ 257
GA. SHARE$
64
0TH SHARE$
PE LOCL
ROW 1994 $
28
CONST 1994 $ 407
FED SHARE$ 326
GA, SHARE$
6
0TH SHARE$
87
L
or <:F:ORGI /I ()F:PI\RTMF:NT
TRI\NSPORTI\Tlotl
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 272
COUNTY
DESCRIPTION
FISCAL
COST
P,l,NO,
PROJECT DATA
l
COHHl!:NTS
YEAR . ESTS
PU--L-A-SK--I --C-O-U-N-T-Y--O--PE-R-A--TE-D---P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E---------------------------------------------------------------------------.-~-------
381239 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 9
FUNDS RECIPIENT: PULASKI MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
OPERATING 1994 $
22
FED SRME $
13
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
OTR SKARE$
9
PULASKI 381239
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PULASKI MANAGER! STEVE KISH
CONG DIST. 9
OPERATING 1995 $
22
FUND SOURCE: RURAL TRANSIT
FED SRARE $
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SRARE $
OTR SHAU$
9
PULASKI 381240
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PULASKI
MANAGER: STEVE KISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
OPERATING 1996 $
24
FED SHARE$
14
GA. SHARE$
0TH SHARE$
10
PULASKI JC22J9
ONE CONVERSION VAN WITR LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CI\.PITAL FUNDS RECIPIENT: PULASKI HANAGERr STEVE KISH
CONG DIST. 9
CI\.PITAL 1994
$
J2
FUND SOURCE: RURAL TRANSIT
FED SRAJUI! $
26
FEDERAL TRANSIT ADHIN FUNDS
GA. SRARE $
J
OTRSHAU $
3
PULASKI JJ1620
SR 230@ SOUTH PRONG BIG TUCSAWHATCHEE CRK W/HAWP:INSVILLE REPLACEMENT OF THE EXISTING BRIDGES(SJ. NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: GORDON BROWN
CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAH F~DERAL HIGHWAY ADHIN FUNDS
PE 1993 ONDERWA?
ROW 1995 $
15
CONST 1996 $ 500
FED SRAJUI! $ 400
GA. SRAJUI! $ 100
OTR SHARE $
PULASKI 332030
SR 11/US 341 OVER TOWN CREEK NORTH OF HAWP:INSVILLE
REHAB. or THE EXISTING BRIOGE(S). FROM 2 LANES TO J LANES.
PROJECT MILEAGE : ,00
.
H['NAGER1 H. ASHMORE
CONG DIST .8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAH FEDERAL HIGHWAY ADMIN FUNDS 322170 IS AN ASSOCIATED PROJECT.
PE NONE $
0
ROW NONE $
0
CONST 1995 $ 246
FED SHARE$ 197
GA. SRARE $
49
0TH SHARE$
..
,,
., ...
"!
-~
~
~
~
~
~
~
~
~
~K!
~
-~
~fjff::~
i>li~:~,i
~:i:t':~i':
1~:-- . ., ..
,.1
..
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 273
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
PU-T-N-A-M----C-O-U-N-T-Y--O-P-E-R-A-T-E-D---P-U-B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E----------------------------------------------------------------------------------
2Bllfi3 TRANSIT FACILITIES. / OPERATIONS
CONG DIST. 11
FUNDS M:CIPIENT: PUTNAM MANAGER: STEVE KISH
OPERATING 1994 $
65
FUND SOURCE: RURAL TRANSIT
FED SHARE$
38
FEDERAL TRANSIT ADHIN FUNDS
GA, SHARE$
OTR SHARE$
26
PUTNAM 2Bll64
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1995 $
61
FUND SOURCE: RURAL TRANSIT
FED SHARE$
39
'
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
28
PUTNAM 2Bll65
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1996 $
10:
FUND SOURCE: RURAL TRANSIT
FED SHARE$
41
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
29
PUTNAM 2C2163
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISR
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1994
$
32
FED SHARE $-
26
GA. SHARE$
3
0TH SHARE$
3
PUTNAM 2C2165
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH
CONG DIST. 11
FUND.SOURCE: RURAL TRANSIT
CAPITAL 1996
$
21
FED SHARE$
11
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
PUTNAM 221840
SR 44 FM SR 16 NORTH/EATONTON TO HP 2.89/GREENE CO RECONSTRUCTION, WIDENING, NO LANE ADDITION PROPOSED. PROJECT MILEAGE: 13,09 MANAGER: D, GRIFFITH
CONG. DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL ~IGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY
AFTER 96 AFTER 96
PUTNAM 222020
SR 16@ LITTLE RIVER W/EATONTON
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .57
..
MANAGER: D. GRIFFITH
CONG DIST. 11
" FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHNAY ADMIN FUNDS
PE 1993 UNDER"AY ROW 1993 UNDER"AY CONST 1995 $ 1200
FED SHARE $ 960
GA. SHARE $ 240 OTR SHARE $
1:i=:onr.) /I (1F:r /IRTMF:IIT OF Tll/ltlSPOllT /IT ION
STATE TRAHSPORTATIOH IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
-- ----- P, I ,NO.
PROJECT DATA
COMMENTS
P-U-T-N-A-M----S-R--2-4--A-T--"-A-S-H-I-N-G-T-O-N---A-V-EN--U-E--IN---E-A-TO--N-TO--N------------------------------
222450 SIGNALS/ TRAFFIC
CONG DIST. 11
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PUTNAM 241970
(.
SR 24/MILLEDGEVILLE RD@ CR 72/CR 217 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : 4.7 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER! D, GRIFFITH
CONG DIST, 11
FUND SOURCE: RWY, SAFETY FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 274
FISCAL
COST
----YEAR
ESH
PE 1994
---------
,$
7
ltOW NONE $
0
CONST 1994 $ 229
FED SHARE$ 229
GA. SHARE$
OTR SHARE$
PE 1992 ROW LOCL CONST
UNDERWAY AFTER H
: .
:,
'r
fflB!
~
. ~
1
~.,
~~
~~
~
-"41.~
~
~
~
l,!~i~f~~
j::!ew;,;,r,;
.~, ..
GEORGIA DEPARTHF.NT OF TIU\NSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 275
------- COUNTY
DESCRIPTION
P.I.NO.
PROJECT DATA
O--U-IT-H-A-N---C-O-U-N--TY---O-P-E-R-ATED PUBLIC TRANSIT
FISCAL
COST
SERVICE----------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
481268 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 2
FUNDS RECIPIENT: QUITMAN MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
OPERATING 1994 $
23
FED SHARE$
14
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
9
OUITHAN 481269
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: QUITMAN MANAGER: STEVE .KISH
CONG DIST. 2
OPERATING 1995 $
24
FUND SOURCE: RURAL TRANSIT
FED SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
10
QUITMAN 481270
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: QUITMAN MANAGER! STEVE KISH
CONG DIST. 2
OPERATING 1996 $
25
FUND SOURCE: RURAL TRANSIT
FED SHARE$
15
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
10
OUITHAN 4C2268
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: QUITMAN MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1994
$
31
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
OUITHAN 431070
SR 39@ BUSTAHATCHEE CREEK 7 MI NORTH OF GEORGETOWN
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25
.
MANAGER: J, LINDSEY
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY ROW 1994 UNDERWAY CONST 1994 $ 601
FED SHARE $ - 481 GA. SHARE $ 120
0TH SHARE $
QUITMAN 431290
SR 27/SR 39: OVER TOBANNEE CREEK NORTH OF GEORGETOWN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES, PROJECT MILEAGE : .OO MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW
CONST
$
10
AFTER 96
AFTER 96
r.r.nr,1~1 I\ flF:PI\RTMF:IIT OF' Tl'\1\11~1'01'\TATIOr~
STI\TE TRANSPORTI\TION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
I6-Sep-1993 Page 276
COUNTY
DESCRIPTION
FISCAL
COST
--P.1.NO.
PROJECT DATA
COMMENTS
YEAR
BSTS
IU.BU.N-----C-O-U-N-T-Y--O-P-E-R-A-T-E-D--P-U--B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E--------------------------------------------------------------------------~. ~-------
181038 TRANSIT FACILITIES / OPERATIONS
CONG DIS.T. 9
FUNDS RECIPIENT: RABUN MANAGER: STEVE KISH
OPERATING 1994 $
17
FUND SOURCE: RURAL TRANSIT
FED SHARB $
10
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
7
RABUN 181039
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RABUN HMIAO!R: STEVE KISH
CONG DIST. 9
OPERATIN0.1995 $
17
FUND SOURCE: RURAL TRANSIT
FED SHARE$
10
FEDER.AL TRANSIT ADHIN FUNDS
GA. SRARB $
0TH SHARE$
7
RABUN lBlOtO
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: RABUN MANAGER: STEVE KISH
CONG DIST, 9
OPERATING 1996 $
18
FUND SOURCE: RURAL TRANSIT
FED SHARE$
10
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
8
RABUN 1C20l8
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT! RABUN MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1994
$
31
FUND SOURCE! RURAL TRANSIT
FED SHARE$
25
F~DERAL TRANSIT ADHIN FUNDS
GA, SHARE$
3
0TH SHARE$
3
RABUN 121950
SR.2 ACROSS DAVIS GAP/EB HP 11.24-12,66rWB HP 12.14~13.56 ADDITION OF A PASSING LANE. PROJECT MILEAGE: 2.32 MANAGER: L, OWENS
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ONDERWAY
ROW 1994 $
59
CONST 1995 $. 1076
FED SHARE $ . 861
GA. SHARE $ 215
0TH SHARE $
RABUN 171040
TALLULAH GORGE TRAILS/LANDSCAPING ALONG OLD 441 'OLD RR BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT.MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST, 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS
PE-LOCL
ROW 1994 $
16
CONST 1994 $ 708
FED SHARE$ 566
GA. SHARE$
3
0TH SHARE$ 145
..
.,
:i
~
.. ~ --~
~
-~
~
!!5.11
~
'lf~
-=
~
-=~.
~
~
,\..~~;.~
.i\
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 277
COUNTY
DESCRIPTION
FISCAL
. COST
P,I,NO.
PROJECT DATA
COMMENTS
YE.All
ESTS
RI-C-H-M-O-N-D--C-O-U-N-T-Y--O--PE-R-A-T-E-D---P-U-B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------
281169 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 10 C 11
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH
OPERATING 1994 $
65
FUND SOURCE: RURAL TRANSIT
FED SHARE$
37
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
OTR SHARE$
27
RICHMOND COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1169 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: RICHMOND
MANAGER: STEVE KISH
CONG DIST. 10 C 11
OPERATING 1995 $
69
FUND SOURCE: RURAL TRANSIT
FED SHARE$
39
FEDERAL TRANSIT AOMIN FUNDS
GA, SHARE$
0TH SHARE$
29
RICHMOND COUNTY OPERATED PUBLIC TRANSIT SERVICE 281170 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH
'
RICHMOND TWO STANDARD VANS AND TWO MOBILE RADIOS 2C2169 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH
RICHMOND ONE CONVERSION VAN WITH LIFT ANO ONE MOBILE RADIO 2C2169 TRANSIT FACILITIES/ CAPITAL
FUNDS-RECIPIENT: RICHMOND MANAGER: STEVE KISH
CONG DIST, 10 C 11
OPERATING 1996 $
71
FUND SOURCE: RURAL TRANSIT
FED SHARE$
40
FEDERAL TRANSIT AOMIN FUNDS
GA, SH.ARE$
0TH SHARE$
30
CONG DIST, 10 C 11
CAPITAL 1994
$
42
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$ GA. SHARE$ 0TH SHARE$
34
CONG DIST. 10 C 11
CAPITAL 1995
$
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
OTH.SHARE $
3
. RICHMOND ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO 2C2170 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH
CONG DIST, 10 C 11
CAPITAL 1996
$
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHAAE $
4
0TH SHARE$
3
RICHMOND BUS VACUUM, COMPUTERS, UPGRADE FAAEBOX EQUIPMENT, 4 VANS
202010 TRANSIT PROJECTS/ CAPITAL FUNDS RJl!CIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 10 C 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1994
$ 245
FED SHARE$ 196
GA. SHARE$
25
0TH SHARE$
25
r.F:oR:JI\ PF.rl\PTHF.IIT OF TP.l\tlSrORTI\Tl()fl
STATE TRJI.NSPORTI\TION lHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 279
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
Y~
. ESTS
R-I-C-H-M-O-N-D--P-U-R-C-H-A--SE---5-T-R--A-N-S-IT---V-E-H-I-C-L-E-S-----------------------------------------------------------------------------------------------
202011
TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER! STEVE KISH
CONG DIST. 10, 11
CAPITAL 1995
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
950 760
95
0TH SHARE$
95
RICHMOND PURCHASE 3 TRANSIT VEHICLES AND ONE AUTOMOBILE 202012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE.KISH
CONG DIST, 10, 11 -,
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$ 822
FED SHARI:$ 658
GA. SHARE$
82
0TH SHARE$
82
RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA ANO RICHMOND COUNTY 202013 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10, 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $ FED SHARI:$ GA. SHARE$ 0TH SHARE$
1747 786
3 9U
RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA ANO RICHMOND COUNTY 20201 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM
MANAGER! STEVE KISH
CONG DIST. 10, 11
FUND SOURCE-: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ FED SHARI:$ GA. SHARE$ 0TH SHARE$
1852
778
6 1069
RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND RICHMOND COUNTY 202015 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10, 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996 $ FED SHARE$ GA. SHAU$ 0TH SHARE$
1963 785
2
1190
RICHMOND ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
. 2V1019 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA MPO AREA
MANAGER: STEVE RISH
.
CONG DIST. 10, 11
CAPITAL 1994
$ u
FUND SOURCE: ELDERLY' DISABLED FUND FED SHARE$
39
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
0TH SHARE$
5
RICHMOND ELDERLY ANO DISABLED VEHICLES ANO EQUIPMENT 2Vl020 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA HPO AREA MANAGER: STEVE RISH
CONG DIST. 10, 11
CAPITAL 1995
$
50
FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$
40
FEDERAL TRANsiT ADHIN FUNDS
GA. SHARE$
5
0TH SHARE$
5
., Cl
, .
., ..
-.~, = = -~ ~ ~
~
"
~
~r@
I'."~=
==
~
~~(L.(:L!..j
f'
~
~,
~
-~~~i
j.-- ~- \\:
.-,'"
GEORGIA OF.PARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 279
COUNTr
OESCRIPTION
FISCAL.
COST
P,I.NO.
PROJECT OATA
COMMENTS
YE.AR
ESTS
R-I-C-H-M-O-N-D--E-L-D-E-R-L-Y---A-NO---D-IS-A-B-L-E-D---V-E-H-I-C-L-E-S--A-N-O--E-O-U-I-P-H-E-N-T-------------------------------------------------------------------------------
2Vl021 TRANSIT PROJECTS/ CAPITAL
CONG DIST, 10 C 11
FUNDS RECIPIENT: AGENCIES IN AUGUSTA HPO .AREA MANAGER: STEVE RISH
CAPITAL 1996
$
52
FUND SOURCE: ELDERLY C DISABLED tUND FED SR.ARE$
42
FEDERAL TRANSIT ADMIN FUNDS
GA, SR.ARE$
5
OTR SHARES
5
RICHHONO I-520 FM 1-20 TO SR 56SP INCL SHOULDER WORR FM SR 4 TO 56SP
AUGUSTA TIP f RC-520
"210360 RIDING SURFACE REHABILITATION, SURFACE, GRIND, SEAL, STRIPE ET.C.CONG DIST. 10 , 11
PROJECT MILEAGE : 9.30 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: IC FULBRIGHT
FUND SOURCE: I-STATE HAINT.
FEDERAL HIGHWAY AOMIN FUNDS
210430 IS AN ASSOCIATED PROJECT,
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 5546
FED SHARE$ 4991
GA. SHARE $ 555
0TH SHARES
RICHMOND 1-520 FM tmlGHTSBORO RO TO GORDON HWY 210430 RECONSTRUCTION C WIDENING FROH 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.37 MANAGER: IC FULBRIGHT
AUGUSTA TIP f RC-520
CONG DIST. 10
FUND SOURCE: NAT'L,RIGHWAY FEDERAL HIGHWAY AOMIN FUNDS 210360 IS AN ASSOCIATED PROJECT.
PE 1994 UNDERWAY
ROW 1994 $ 414 CONST 1995 $ 2053
FED SH.ARE$ 1642 GA. SHARE$ 411 0TH SHARE$
RICHMOND I-520 FM WHEELER RD TO WRIGHTSBORO RD 210440 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES,
PROJECT MILEAGE: 1.32 MANAGER: IC FULBRIGHT
.AUGUSTA TIP f RC-520
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS
PE 1994 UNDERWAY
ROW 1994 $ 416
CONST 1995
$ 2042
FED SHARE$ 1634
GA, SR.ARE$ 409
0TH SHARE$
RICHMOND 1-520 FM WHEELER RD NORTH TO I-20 210450 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : ,76 MANAGER: IC FULBRIGHT
AUGUSTA TIP f RC-520
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY F.EDERAL HIGHWAY AOHIN FUNDS
PE 1994 ROW 1996 CONST
UNDERWAY
$ 1000 AFTER 96
RICHMOND I-20@ WHEELER RO/ALSO COLUMBIA CO. 210490 INTERCHANGE/ NEW CONSTRUCTION
PROJECT MILEAGE : .27 - EXIST. LANES: 4 /PROPOSED LANES: 6 MANAGER: NEIL DAVIS
RICHMOND BOBBY JONES XWY FM LANEY WALKER BLVD TO SAVANNAH RIVER 220105 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : .. 89 MANAGER: D. SMITH
AUGUSTA TIP f Rc-cc-20 CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS 250430 IS AN ASSOCIATED PROJECT.
AUGUSTA TIP f RC-117 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 8730
FED SHARE $ 6994 GA. SHARE $ 1746 0TH SHARE $
PE NONE ROW 1991 CONST
$
0
UNDERWAY
AFTER 96
r,r,np,; I I\ [lf:P /\l'TMF.IIT or TP.MISPOl'T/\TION
ST/\TE TRAflSPORT/\TION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 280
COUNTY
DESCRIPTION
FISCAL
COST
p, I ,NO,
PROJECT DATA
.
COMMENTS
YEAR
ESTS
RICHMOND SR 4/15TH ST/-A-U-G-U-S-T-A---FM---M-I-L-L-E-D-G-E-V-I-L-L-E--R-D--T-O--G-O-V-E-R-N-M-E-N-T--S-T---------A-U-G-U-S-T-A--T-I-P--I--R-C---0-3-9--------------------PE---1-9-9-2-.---U-N-D-ER-WAY
220680 RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST, 11
ROW 1994 $ 735
PROJ!CT MILEAGE: ,87
CONST 1996 $ 1912
MANAGER: BILL MOSKAL
FUND SOURCE: SURFACE TRANSPORT,
FED SHARE$ 1530
FEDERAL HIGHWAY ADHIN FUNDS
GA, SHARE$ 382
0TH SHARE$
RICHMOND SR 56 FM SR 23 TO SR 56 SP:NEW LOC TO SR 56:TO BENNOCH HILL 221190 RECONSTRUCTION C WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: 6.20 MANAGER: RAY METTS
AUGUSTA TIP I RC-038
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 221185 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1992 CONST
UNDERWAY UNDERWAY AFTER 96
RICHMOND SR 56@ MCBEAN CREER/ALSO BURRE CO 221185 REHAB, OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE: ,04 MANAGER: RAY METTS
CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221180 IS AN ASSOCIATED PROJECT.
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
RICHMOND TOBACCO RD FM SR 4/US 1 TO WINDSOR SPRING RD 221440 RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 2.46 MANAGER: D, GRIFFITH
RICHMOND SR 56 SP/NEW SAVANNAH RD FH I-520 N TO US 79/GORDON HWY 221470 RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.12 MANAGER: D, CHURCH
RICHMOND SR 10/GORDON HWY FM SR 223 TOW/FORT GORDON GATE fl/CCLVT 221532 RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.50 MANAGER: BILL MOSKAL (C)
RICHMOND SR 4/0EANS BR RO.FM S FT GORDON GATE 5 TO HP 20.75 221550 TURN LANES/ RECST. OR REHAB.
PROJECT MILEAGE: 6.70 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GRIFFITH
1.
AUGUSTA TIP I RC-207 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
AUGUSTA TIP I RC-207
CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 250340 IS AN ASSOCIATED PROJECT.
AUGUSTA TIP I GH. 025
CONG DIST. 10
FUND SOURCE: suRFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
AUGUSTA TIP I RC-043
CONG DIST. 11 , 10 GRIP-PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 3353 FED SHARE$ 2682 GA, SHARE$ 671 OTR SHARE$
PE 1992 UNDERWAY ROW LOCL CONST 1994 $ 3999
FED SHARE$ 3199 GA. SHARE$ 800 0TH SHARE$
PE 1993 UNDERWAY
ROW 1994 $ 346 CONST 1995 $ 4271
FED SHARE$ 3417 GA, SRA.RE$ 854
0TH SRA.RE$
PE 1994 UNDERWAY
ROW 1994 $
45
CONST 1995 $ 1150
FED SHARE$ 920
GA, SHARE$ 230
0TH SHARE$
. ,, .
, .
... r~
~
~
--~ = = = ~ I
:p!~
~
~
~
~ !!fi';ir,a
~
"
~:i-;:;i~l
f;ir~i.~~
,'l(.l<".~"4
1';"~
f .... : ,.i
..
COUNTY ,.1.No.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
RICHMOND SR 415@ UTILITY; ROCKY: PHINIZYt BEAVER: LOVERS: CSX: MARY 221580 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .08 MANAGER: O. SMITH
AUGUSTA TIP f RC-117 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS 221588 IS AN ASSOCIATED PROJECT.
16-Sep-1993 Page 281
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1996 $ 6849
FED SllARE $ 5479
GA. SllARE $ 1370
0TH SHARE $
RICHMOND SR 415 fM NEW SAVANNAH RD TO LANEY WJ\.LKER/INCL TIE TO SR 28 221588 CONSTRUCTION or NEH ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 5.15 MANAGER: O. SMITH
AUGUSTA TIP f RC-117 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS 221580 IS AN ASSOCIATED PROJECT.
PE 1991 UNDERWAY
ROW NONE $
0
CONST 1996 $ 7600
FED SHARE $ 6080
GA. SHARE $ 1520
OTR SHARE $
RICHMOND SR 28/FURYS FERRY RO FM RIVERHATCH PK TO CR 98/SEE COLUMBIA
22186X UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CHURCH
AUGUSTA TIP f RC-CC-048 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 221860 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1996
CONST
UNDERWAY
$
0
AFTER 96
RICHMOND 1-520/SR 415 @ SR 56 ADD "8 LOOP 222350 RAMP/ NEW CONSTRUCTION
PROJECT MILEAGE: .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: O. CHURCH
AUGUSTA TIP f RC-520 CONG DIST. 10, 11
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1993
ROW 1995 CONST
UNDERWAY
$ 1000 AFTER 96
RICHMOND SR 4/US 1@ TOBACCO RO IN AUGUSTA 222370 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE: .50 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: O. CHURCH (M)
AUGUSTA TIP f RC-043
CONG DIST. 10, 11 GRIP PROJECT
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS
PE 1994 ROff 1996
CONST
$ 200
$
25
AFTER 96
RICHMOND GREENE STREET FM 12TH STREET TO 4TH STREET IN AUGUSTA 222430 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : 1.36 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
RICHMOND SR 88 FM W/CR 65/HEPHZIBAH E TO SR 121/US 25 231000 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.30 MANAGER: D. GRIFFITH
AUGUSTA TIP f RC-048 CONG DIST. 11 FUND SOURCE: RWY. SAFETY FEDERJ\L RIGRWAY.AOMIN FUNDS
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1994 $
17
ROW 1995 $
10
CONST 1996 $ 578
FED SHARE$ 520
GA. SHARE$
58
0TH SHARE$
PE 1992 UNDERWAY
ROW 1992 UNDERWAY CONST 1994 $ 2007
FED SHARE $ 1606 GA. SHARE $ 401
0TH SHARE $
r.tonr.111 tJF:PI\RTMF:IIT or TRl\!ISP0RTI\TI0N STATE: TRANSP0RTI\TI0N IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 282
COUNTY
P, I.NO,
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL YEAR
COST ESTS
RICHMOND CSX RAILROAD AT OLIVE RD IN AUGUSTA
AUGUSTA TIP f RC-9104
---------P-E---1-9-9-1 .---U-N-D-E-R-W--AY
240809 BRIDGES/ TRAFFIC
CONG DIST, 11 C 10
ROW LOCL
PROJECT MILEAGE: ,47 MANAGER! D. CHURCH
CONST 1996 $
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
24Y809 IS AN ASSOCIATED PROJECT.
0TH SRARE $
3219 2575
644
RICHMOND SHOWN FOR RR DEMO" HONEY ONLY .. SEE 240809 FOR PROJECT INFO
24Y809 UNKNOWN/ TRAFFIC PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: D, CHURCH
AUGUSTA TIP I RC-9104
CONG DIST. 11 C 10
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 240809 IS AN ASSOCIATED PROJECT.
PE 1991 UNDERWAY ROW LOCL CONST 1996 $ 2306
FED SHARE$ 2191 GA. SHARE$ 115 0TH SHARE$
RICHMOND BELAIR RD EXT FH FT GORDON GATE 1 TO BELAIR RD/I-20/COLUMBIA 250320 CONSTRUCTION OF NEW ROUTE WITR 4 LANES PROPOSED.
PROJECT MILEAGE:. 3.28 MANAGERt D. CHURCH
AUGUSTA TIP I RC-CC-207 CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY RON 1993 UNDERWAY CONST 1994 $ 1U82
FED ~HARE.$ 13186 GA. SHARE $ 3296 0TH SHARE$
RICHMOND SR 56 SPUR/NEW SAVANNAH RD@ ROCRY CREER 250340 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE: .30 MANAGER! D, CHURCH
AUGUSTA TIP I RC-207 CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 221470 IS AN ASSOCIATED PROJECT.
PE 1986 UNDERWAY
ROW 1987 UNDERWAf
CONST 1994 $ 407
FED SRARE $ 326
GA. SHARE$
81
0TH SHARE$
RICHMOND WINDSOR SPRINGS RD FM RICHMOND HILL RD TO B JONES XWAY 250370 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .53 MANAGER: O. SMITH
AUGUSTA TIP I RC-7007 CONG DIST. 11
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY RON LOCL CONST 1994 $ 1370
FED SHARE$ 1028 GA. SRARE $ 343 0TH SHARE$
RICHMOND WINDSOR SPRINGS RO FM HEAOOWBROORS OR TO RICHMOND RILL RO 250372 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE :. 1. 06 MANAGER: D. SMITH
AUGUSTA TIP I RC-7007 CONG DIST. 11, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHtfAY ADMIN FUNDS
PE 1992 UNDERWAY ROtf LOCL CONST 1994 $ 2226
FED SHARE$ 1781 GA. SHARE$ 445 0TH SHARE$
RICHMOND WINDSOR SPRINGS RO FM TOBACCO RO TO MEAOOWBROOR OR 250374 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1,82 MANAGER: D. SMITH
AUGUSTA TIP I RC-7007 CONG DIST. 11
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY ADMIN FUNDS 25Y374 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY ROW LOCL CONST 1994 $ 2287
FED SHARE$ 1715 GA. SHARE $ 572
0TH SHARE$
'1. "
't
H
~
~..!El
. ' == .~
~
"
:~
!!fM
-m:.=
l\W~!lJ
w:.::~1~
lf.:l'IPn:<.
=~~
~~
I.. :: .:~t
.' ..
GEORGIA DEPARTMENT OF TRJ\l'ISPORTATION STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY fOUNTY FY 1994/FY 1996
16-Sep-1993 Page 283
C011NTY
DESCRIPTION
FISCAL . COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
RICHMOND CR 65/WINDSOR SPRINGS RO@--B-U--T-LE-R---C-R-EE-K--------------------.--------A-U-G-U-S-T-A--T-I-P--f--R-C---7-0-0-7-------------------P-E--1-9-9-2-----U-N-DE-R-WAY
250375 REPLACEMENT OF THE EXISTING BRIDGES(S). FROH 2 TO 4 LANES.
CONG DIST. 11, 10
ROW LOCL
PROJECT MILEAGE : .02
CONST 1994
$
556
MANAGER: D. SMITH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
445
FEDERAL HIGHWAY AOHIN FUNDS 250374 IS AN ASSOCIATED PROJECT.
GA. SHARE$
111
0TH SRARE $
RICHMOND WHEELER RD/CR 601 FH I-20 TO MEDICAL CENTER DRIVE 250430 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .91 MANAGER: NEIL DAVIS
AUGUSTA TIP f RC-CC-7011 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS 210490 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$ 2066
FED SHARE$ 1653
GA. SHARE$
413
0TH SHARE$
RICHMOND CR 200/WHEELESS RD@ ROCKY CREEK JUSTS/MILLEDGEVILLE RD 250490 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .15 MANAGER: D. GRIFFITH
AUGUSTA TIP f RC-7000 CONG DIST. 11, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOHIN FUNDS
PE 1994
ROW LOCL CONST
$
39
AFTER 96
RICHMOND 15TH ST@ CSX M NEAR GREENE ST IN AUGUSTA 250500 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .OO MANAGER: D. CHURCH (H)
AUGUSTA TIP f RC-0048 CONG DIST. 11
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY AOHIN FUNDS
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
RICHMOND WALTON WAY INTERSECTION IMPROVEMENTS WITH 13TH ST/AUGUSTA 250550 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE: .15 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D. GRIFFITH
RICHMOND WINDSOR SPGS RD FRM TOBACCO RD TO MEADOWBROOK DR (SPLIT FUND 25YJ74 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.82 MANAGER:
RICHMOND PEDESTRIAN OVERPASS' Ht.NDICAP RAMP AT AUGUSTA RIVERWALK 270890 BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
AUGUSTA TIP f RC-7027 CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOHIN FUNDS
AUGUSTA TIP I GR 01
CON.G DIST. _11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS 250374 IS AN ASSOCIATED PROJECT.
AUGUSTA TIP I RC-OOOE
CONG DIST. 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1994 $ uo
FED SHARE$ 126
GA. SHARE$
u
0TH SHARE$
PE 1992 UNDERWAY
RO" NONE $
0
CONST 1994 $ 2320
FED SHARE $ 1856
GA. SHARE $
464
0TH SHARE $
PE 1994 $
20
ROW LOCL
CONST 1994
$
300
FED SHARE$ 240
GA. SHARE$
0TH SHARE$
60
r.F.ClP<;JJ\ l>F.P/111TMF.tlT OF TRI\IISPUPTJ\TION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
---- ---- P,I.NO.
PROJECT DATA
R-I-C-H-M-O-N-D--C-R--3-6-1-/-D-A-N---BO-W--L-E-S--R-O-A-D-@---N-O-R-F-O-L-K--S-O-U-T-H-E-R-N--R-A-JL-R-O-A-D---.-1732965F
--- COMMENTS
270930 M XINO / TRAFFIC
CONO DIST. 10
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES1 0
, I
MANAGER:_ W HESTER
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
RICHMOND CR 997/PERKJNS ROAD AT NORFOLK SOUTHERN RAILROAD,.l732968B 2709t0 RR XINO / TRAFFIC
PRO.nCT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOHIN FUNDS
16-Sep-1993 Page 284
FISCAL
COST
YEAR
ESTS
PE -N--ONE -----$ ------0
ROW N0NE $
0
CONST~l994 $
73
FED SHARE$
66
GA, SHARE$
7
0TH SHARE$
PE NONE $
0
ROW NONE $
.0
CONST 199'4 $
72
FED SHARE$
65
GA. SHARE$
7
OT.ff SHARE $
. i
,.
' '1
... f;
'&
~
~
. ~- == ,. .~- "" ~ ~ =
= =
== . ~-- i,;~n0:,s !f!l~rel er.j~;~ ~!O!Ji;:f~ ~-~~~ \~--:.':;I: r.-.--:-. '
..
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 285
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL . COST
YEAR.:
ESTS
ROCKDALE ELDERLY AND DISABLED VEHICLES ANO EQUIPMENT
------ - ----------------------------
7Vl034 TRANSIT PROJECTS/ CAPITIU.
CONG DIST, 4
FUNDS RECIPIENT: AGENCIES IN ROC!tDALE COUNTY MANAGER: STEVE KISH
CAPITAL 1994
$
9
FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$
7
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SRAAE $
1
ROCiDALE ELDERLY ANO DISABLED VEHICLES AND EQUIPMENT 7Vl035 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN ROCKDALE COUNTY MANAGER: STEVE KISH
CONG DIST, 4
CAPITAL 1995
$
10
FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
ROCKDALE ELDERLY ANO DISABLED VEHICLES ANO EQUIPMENT
7Vl036 TRANSIT PROJECTS/ CAPITIU.
FUNDS RECIPIENT: AGENCIES IN ROCKDALE COUNTY
I.
MANAGER: STEVE KISH
CONG DIST, 4
CAPITAL 1996
$
10
FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHAAE $
1
ROCKDALE SALEH RD FH FLAT SHOALS TO N/RR(INCL BR@ I-20;RECST INTCH) 712090 RECONSTRUCTION, WIDENING FROM 2 LANES TO 6 LANES.
PROJECT MILEAGE: ,60 MANAGER: BILL MOSKAL
ATLANTA TIP IR 1 CONG DIST. 4
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1986
UNDERWAY
ROW 1991 UNDERWAY
CONST 1994
$ 9352
FED SHARE.$ 8417
GA. SHARE$ 935
OTR SHARE$
ROCKDALE I-20/CONYERS@ WEST AVE 712240 INTERCHANGE/ RECST, OR REHM.
PROJECT MILEAGE: .73 - EXIST. LANES: 3 /PROPOSED LANES: 5 MANAGER: BILL MOSICAL
ROCKDIU.E PARKER RD FM CULPEPPER TO DARLAND@ MALCOLM INCL BR OVER I20 712640 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: ,72 MANAGER: BILL MOSKAL
ATLANTA TIP IR 19 CONG DIST. 4
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I RO 15
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 71Y640 IS AN ASSOCIATED PROJECT.
PE 1986 UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$ 2423
FED SHARE $ 2181
GA. SHARE $ 242
0TH SHARE $
PE LOCL
ROiif 1995
$ .
CONST 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
3410 4866 3893
973
ROCKDIU.E PARKER RD FH CULPEPPER TO OAKLAND@ MALCOLM/BR @I-20 712640 71Y640 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : ,00 MANAGER:
ATLANTA TIP I RO 15
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 7126.40 IS AN ASSOCIATED PROJECT.
PE LOCL
ROW NONE
$
CONST 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 1979 1583
396
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
r.r.np,~ I" rir.rl\PTHF:IIT OF TIU\tlSr()RTI\T J()N STI\TF.: TR/\NSrORTATION JMPROVF.:HENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
~OC~DALE SR 138 FM RELOC SR138@ SR 20 TO 1-20 121580 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJ!:CT MILEAGE : 1.26 MANAGER! D. CHURCH
ATLANTA TIP I RO 35
CONG DIST. 4
FUND SOURCE: SURFACE-TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 286 .
FISCAL
COST
YEAR
ESTS
-.P-E--1--9-9-3---U-N-D-E-R-W--AY
ROW 1996 $ 2390
CONST
AFTER 96
~OC~DALE SR 20 FH SOUTH OF HONEY CREE~ RO TO RELOCATED SR 138 130903 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.88 MANAGER! D. CHURCH (HI
ATLANTA TIP I RO 18
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AFTER 96 AFTER 96
~OC~DALE EXTEND BR CLVT ON SR 20@ ALMOND BR.A.NCR 130905 REHAB. OF THE EXISTING BRIOGE(S). FROH 2 LANES TO 4 LANES.
PROJECT MILEAGE: .01 MANAGER: D, CHURCH (M)
ATLANTA TIP I RO 44
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1991 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
ROC~DALE SR 20 FH SR 212 IN NEWTON CO NORTH TO RONEY CREE~ RD/CR 23 730907 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.50 MANAGER: 0. CHURCH. (HI
ATLANTA TIP I RO 28
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL ~IGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
ROC~OALE SR 20@ BIG HAYNES CREE~ NEAR WALTON CO LINE 730950 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE: ,20 MANAGER: D. GODWIN
ATLANTA TIP I RO 42
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1995 ROW CONST
$
52
AFTER 96
AFTER 96
ROC~OALE SR 138 FROM SIGMAN RO/SR 20 TO DENNARD RO 731040 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 2.75 . MANAGER: D. CHURCH
ROC~OALE SR 138@ YELLOW RIVER 731045 REHAB. OF THE EXISTING BRIOGE(SI. FROM 2 LANES_ TO 5 LANES.
PROJECT MILEAGE : .02 MANAGER: D. CHURCH
ATLANTA TIP I RO 13
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 731045 IS AN ASSOCIATED PROJECT.
ATLANTA TIP I RO 46
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 731040 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW 1994 $ 1933 CONST 1995 $ 5815
FED SHARE $ 4652 GA. SHARE $ 1163
0TH SHARE $
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 . $ 722
FED SHARE$ 578
GA. SHARE$ 144
0TH SHARE$
4. If
..
.,, ...
~
~
~
~
~
~ .r~:~Yl
= ~
~
f;J?,!)!.;\i
i!.'f!f!!((!'.t
.I~~;~
~
~ :: '.. .;..
. . . ,
ti I~
"
GEORGIA DEPJ\RTHENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 287
COUNTY
DESCRIPTION
FISCAL
COST
P,1.NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
RO-C-I-U->-A-LE--S-R---1-3-9-/S-R---2-0--FR-O-M---N-O-R-TH---O-F--I---2-0--T-O--S-IG-M--A-N--R-O-A-D--------------------A-T-L-A-N-T-A--T-I-P--I--R-O--1-3---------------------p-g--N-O-N-E-----$------O
731047 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
CONG DIST, 4
ROW 1994 $ 5789
PROJECT MILEAGE : 1. 70
CONST 1995 $ 4048
MANAGER: UNKNOWN
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$ 3238
FEDERAL HIGHWAY ADMIN FUNDS
GA, SHARE$ 810
0TH SHARE$
ROCIU>ALE SR 138/SR 20 BRIDGE OVER I-20 731048 BRIDGES/ RECST, OR REHAB.
PROJECT MILEAGE : ,27 MANAGER: UNKNOWN
ATLANTA TIP I RO 13
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $ GA. SHARE$ 0TH SHARE$
0
0
3126 2501
625
ROCKDALE OLD COVINGTON HWY@ ROCKDALE INDUST. BLVD, FARMER ROAD
742510 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .20 - EXIST, LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN
ATLANTA TIP I RO 31
CONG DIST. 4
FUND SOURCE:. HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1995 $ 205
FED SHARE$ 185
GA. SHARE $
21
0TH SHARE$
ROCKDALE SR 20@ PLEASANT RILL ROAD 742810 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE: .57 - EXIST. LANES: 2 /PROPOSED LANl!:9: 2 MANAGER: D, GODWIN
ATLANTA TIP I RO 36
CONG DIST. 4
FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994 $ 401
FED SHARE$ 361
GA. SHARE$
40
0TH SKARE$
ROCIU>ALE SIGMAN RO FM I-20 NORTH TO SR 20/138 (EAST LEG) 752210 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE: 2,50 MANAGER: D. CHURCH (M)
ATLANTA TIP I RO 30
CONG DIST, 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
20
AFTER 96
ROCKDALE OLD COVINGTON HWY FM GREEN ST TO SR 138/20 752270 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : ,00 MANAGER: D. CHURCH (M)
ATLANTA TIP f RO 34 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
10
AFTER 96
ROCKDALE FLAT SHOALS ROAD@ OLD SALEH ROAD
752280
INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : .20 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: D. GODWIN
f
ATLANTA TIP I RO 25
CONG DIST. 4
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994 $ 256
FED SHARE$ 230
GA. SHARE$
26
0TH SHARE$
COUNTY P.I.NO.
DESCIHPTION PROJECT DATA
l'";f.()PI~ I/\ or.r/\RTMEtlT ()f' TR/\IISrORT/\T ION ST/\TE TRJ\tlSPORT/\TlON IMPROVEMENTS PROGRJ\H PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
ROCKDALE JOHNSON RD/CR 56 AT EBENEZER RD 752350 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE: .20 - EXIST. LANES! 0 /PROPOSED LANES: 0 MANAGER:
ATLANTA TIP f RO 24 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ROCltDALE SMYRNA RD/CR 438@ KLONDIKE RD/CR 57 752410 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE 1 .20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
r.
ROCKDALE ROCKBRIDGE RD/CR 74@ HAIN ST IN CONYERS 752420 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE I ,38 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
ATLANTA TfP f RO 17
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f RO 52 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ROCKDALE FARMER RD/CR 439@ SIGMAN RD/CR 435 752440 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE I ,20 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER:
ATLANTA TIP f RO 30 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
ROCKDALE SR 212 AT TUCKER HILL ROAD AND HONEY CREEK ROAD 752490 TURN LANES/ TRAFFIC
PROJECT MILEAGE: 7,00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:
ATLANTA TIP f R 40 CONG DIST. 4
FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADHIN FUNDS
16-SPp-1993 Page 288
FISCAL YEAR
COST ESTS
PE LOCL
ROW LOCL
CONST 1995 $ 205
FED SHARE$ 185
GA .SKARE $
95
0TH SHARE$ 115
PE LOCL
ROW LOCL
CONST 1995 $ 215 FED SHARE$ 194 GA. SHARE$ 104 0TH SHARE$ 125
PE LOCL ROW LOCL
CONST 1995 $ 408 FED SHARE$ 367 GA. SHARE$ 142 0TH SHARE$ 183
PE LOCL ROW LOCL
CONST 1995 $ 392 FED SHARE$ 353 GA. SHARE$ 173 0TH SHARE$ 212
PE 1994 $
10
ROW 1995 $
10
CONST 1996 $ 231
FED SHARE $: 208
GA. SHARE$
23
0TH SHARE$
,,
ti!
''!
M
~
~
tffil~ ~~ 4,=
t
:~
==:o
~J,@]l
ffilt'.).!!
~t:~,~$
L;.J..~r,~
l'W~?A<-!'.l
~~
j(,j~~;..:;"(i
\.:::::_;:,
,
~
GEORGIA DEPI\RTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 289
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL . COST
P,I.NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
-SC-H-L-E-Y----S-R---26--P-A--S-SI-N-G---L-A-N-E-S-@---4--L-O-C-A-T-IO--N--S-C-H--L-E-Y-,--M-A-C-O-N--C-O-U-N-T-I-E-S-------------------------------------------------P-E--1-9-9-2-----U-N-O-E-R-tfA-Y
321987 ADDITION OF A PASSING LANE.
CONG DIST. 2
ROW 1994 UNOERtfAY
PROJECT MILEAGE : 5.43
GRIP PROJECT
CONST 1995 $ 2222
MANAGER: GORDON BROWN
FUND SOURCE: SURFACE TRANSPORT,
FED SHARE $ 1778
FEDER.AL HIGHWAY ADHIN FUNDS
GA. SHARE $ 444
OTR SHARE $
l
r.r.nPr.t/\ llEP/\RTMF:IIT OF' TRANSrORT/\TION
16-Sep-1993
STATE TRANSPORT/\TlON IMPROVEMENTS PROGR/\H
Page 290
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
I2-C2P-U1-,I3-V,2-NE9-NO--, -SR-RE-P-L2-A1-C-E"-/M.S-EY-NL-TV-A-o-Nr-PI-RAT-HO@-EJE-C-OE-TXG-IE-SDE-TAC-ITNH-AG-E-I!-!B,-R-HI-OO-RG-S-EE-S-(CS-R)-E.-E-RF-RS-O-M--2--T-O--4--L-A-,N-E-S-.--------C-O-N-G--D-CI-OS-HT-H.-E-N1-1T-S-------------------------R-OP-WEY-l!-!N1A-O9R-N9-I2!!-----U$-NE-DS-ETR-SW--AY0
PROJl!CT MILEAGE : .03
GRIP PROJECT
CONST 1996 $ 1354
MANAGER:~ FULBRIGHT
FUND SOURCE: BRIDGE PROGRAM
Fl'!O SHARE$ 1093
FEDERAL HIGHWAY AOMIN FUNDS
GA. SHARE$ 271
OTR SHARE$
SCREVEN SR 17@ JAC~SON BRANCH
231100 Rl!!PLACl!!MENT or THE EXISTING BRIOGl!!S(Sl. NO ADDEO LANES.
PROJl!CT MILEAGE : .33 MANAGER: O. GRIFFITH
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNOl!!R"AY
CONST 1995 $ 339
FED SHARE$ 271
GA. SHARE$
69
0TH SRMZ $
., ,. \t'.
-1.
..,.
~
~
~ ,. ,.
5'~jfilj fl
ee
~,.1;g
I~
t!!~:~!~~
~,.,;~~
. . i;.-.:::-:.,:liji ~!.~!~
~-
~:>:i::i~
v:.-.:..:-<:
''
l.~
GF.ORGIA DEPAATMP.,,T OF' TIU\NSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 291
COUNTY
DESCRIPTION
FISCAL
COST
P.1.NO.
PROJECT DATA
SEMINOLE SR 253@ FISH POND DRAIN ti OF SR 39
------
COMMENTS
YEAR
ESTS
- --------------------------------------------------P-E--1-9-9-2-----U-N-DE-R-W--AY
.31080 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 2
ROW 1994 $
1
PROJECT MILEAGE : .75
CONST 1995 $ 500
MANAGER: J. LINDSEY
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE$ oo
GA. SHARE$ 100
0TH SHARE$
SEMINOLE CR 9/GATOR POND ROAD OVER FISHPOND DRAIN
uno REPLACEMENT OF THE EXISTING BRIDGES (S). NO ADDED LANES.
PROJECT MILEAGE : .50
MANAGER: J. LINDSEY (H)
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
5
ROW LOCL
CONST 1995 $. 201
FED SHARE$ 161
GA. SHARE$
o
0TH S ~ $
r.F.npr; I/\ PEr /\PTMF.NT ()f TIU\tlSrllRT/\T JOtl ST/\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 292
COUNTY
DESCRIPTION
P. I.NO.
PROJECT DATA
-----------------------------------------------------------
!PAI.DINO TAYLOR ST/GRIFFIN FH 16TH ST TO 10TH ST
FISCAL
COST
------------------C-O-M--M-E-N-T-S--------------------------P-EY-E-A1-R9-9-2-----U-NE-DS-ETR-SW--AY
321640 RECONSTRUCTION, WIDENING FROH 4 LANES TO 5 LANES,
CONG DIST. 3
ROW 1993 UNDERWAY
PROJECT MILEAGE: ,70
CONST 1995 $ 1203
MANAGER! J, GRAYBEAL
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 962
FEDERAL HIGHWAY ADHIN FUNDS
.
GA. SHARE$ 241
342480 IS AN ASSOCIATED PROJECT,
0TH SHARE$
SPALDING SR 92 FH W MORELAND RD/GRIFFIN TO US 41/INCL JACKSON RD REL 321820 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2,00 MANAGER: J. GRAYBEAL (C)
CONG oisT. 3
FUND SOURCE: SUP.FACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$ 3555
CONST 1995 $ 2226
FED SHARE $ 1781
GA, SHARE $
445
0TH SHARE $
SPALDING SR 155 NB HP 11,8/SPALDING-0,25/HENRYtSB HP 1.6-3.1/HENRY
331520 ADDITION or A PASSING LANE.
PROJECT MILEAGE : 2.90
MANAGER: GORDON BROWN(M)
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
15
AFTER 96
SPALDING SR 2 OVER UNNAMED CREER@ HP 5,1 NEAR EDWARDS RO
332050 REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDEO LANES,
PROJECT MILEAGE: ,00
MANAGER!
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY .ADHIN FUNDS
Pl!! 1994 ROW.1996 CONST
$
10
$
1
AFTER 96
SPALDING SIGNAL SR 16@ SR 92/GRIFFINt SR 92@ SOLOMON ST INTER IHPR
342480 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE: ,52 - EXIST. LANES: 5 /PROPOSED LANES: 5
MANAGER: J, GRAYBEAL
SPALDING SR 362@ CR 37/CARVER RD 342620 TURN LANES/ TRAFFIC
PROJECT MILEAGE : ,45 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: GORDON BROWN
SPALDING 342621
SR 3/US 19/GRIFFIN FM SR 92 N/CS RECONSTRUCTION, WIDENING FROM 4
804 N LANES
TON/CR 18 TO 6 LANES,
PROJECT MILEAGE : 1,52
MANAGER: J. GRAYBEAL (HI
CONG DIST. 3 FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADHIN FUNDS 321640 IS AN ASSOCIATED PROJECT.
CONG DIST. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 3 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
Pl!! 1992 UNDERWAY
ROW LOCL
CONST 1995 $ 723
FED SHARI!! $ 651
GA. SHARI!!$
72
0TH SHARE$
Pl!! NONE $
0
ROW LOCL
CONST 1994 $ 152
FED SHARE$ 137
GA. SHARI!! $
15
OTH SHARE$
PE 1993 ROW 1995' CONST
UNDERWAY
$ 200 AFTER 96
..
(17
o::
"
C
1,, ....
~
~
~~
'
=te="
~~~~
~
~:.'!i~
Witt:rs
w:s;:r:
r::::.1~
~x.:;.,~
~~
f.-'i.':!iS,.'ij
l;,:i:;::
GEORGIA OEPMTHENT OF TRANSPORTATION
STATE TRANSPORTATION IHPROVEHENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P.I.NO.
PROJECT DATA
S-P-A-L-D-I-N-G--S-R--8-5--C-O-N-N--F-H---SR---1-6--(S-P-A--L-D-IN--G-)N---T-O--C-R--1-6-8--IN---B-R-O-O-~-S-/F-A-Y-l!-!T-T-I-!!------ -
- COMMENTS
32eox RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.
CONG DIST. 3
PROJECT MILEAGE : .00
MANAGER: UNIOIOWN
FUND SOURCI!!: SURFACI!! TRANSPORT.
FEDERAL HIGHWAY ADHIN FUNDS
342800 IS AN ASSOCIATl!!D PROJECT.
..
16-Sep-1993 Page 293
FISCAL Yl!!AR
COST ESTS
Pl!! 1994 ROW CONST
$
0
AFTER 96
AFTER 96
SPALDING CS 877/EXPERIMENT ST/GRIFFIN FH OLD ATLANTA RD TO US 41/SR 3
350710 Rl!!CONSTRUCTION, "IDENING FROM 2 ~ES TO 4 LANES. PROJECT MILEAGE: .35 MANAGER: J. GRAYBEAL
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
Pl!! 1992 ROW LOCL
CONST
UNDERWAY AFTER 96
SPALDING PASSINO LANES SR 16 BETWEEN GRIFFIN, NEtrnAN SEE COl'fl!!TA CO 36351X UNKNOWN/ UNIOIOWN
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 HANAGl!!R: GORDON BROWN
SPALDING RESTORE OPERA ROUSE, CREATE VISITORS Cl!!NTl!!R IN GRIFFIN 371230 MISCELLANEOUS IMPROVEHl!!NTS / l!!NRANCl!!Ml!!NT
PROJECT MILl!!AGI!!: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 HANAGl!!R:
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 363510 IS AN ASSOCIATl!!D PROJECT.
CONG DIST. 3 FUND SOURCE: TRANS. ENHANCI!!. FEDERAL HIGHWAY AOMIN FUNDS
Pl!! NONI!! $
0
RO" 1990 UNOl!!RWAr:
CONST 1994 $
0
FED SHARI!! $
GA. SHARI!! $
0TH SHARE $
Pl!! LOCL
ROW 1994 $: 100
CONST 1996 $ 999
Fl!!D SHARE $ 799
GA. SHARI!! $,
49
0TH SHARE $1 249
r.F.0Rr.t~ ~EP~P.TMF.NT OF TIU\N~PORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM ~ROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 294
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO.
PROJECT DATA
COHHlNTS
YEAR
ESTS
S-T-E-P-H-E-N-S--S-R--1-7--8--O-G-G-S--B-R-A-N-C-H--------------------
.------------------------------------------------------------------------~--~------PE 1986 UNDERWAY
121360 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES,
CONG DIST, 9
ROW NONE
$
0
PROJECT MILEAGE : ;JO
GRIP PROJECT
CONST
AFTER 96
MANAGER: L. OWENS
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
STEPHENS CR lt6/RIVERDALE RD OVER WALTON CREER NE OF TOCCOA 170832 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE : ,10 MANAGER: L. OWENS
STEPHENS CR 16/YOW HILL ROAD 8 EASTANOLLEE CREER 1-,9 MIN OF AVALON 170833 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES,
PROJECT MILEAGE I .20 MANAGER: .
STEPHENS STREETSCAPE AND RENOVATE OLD DEPOT IN TOCCOA 171050 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER!
CONG DIST. 9 FUND SOURCE: BRIDGE _PROGRAM FEDERAL HIGHWAY ADHIN FUNDS.
CONG DIST, 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOHIN FUNDS
CONG DIST. 9 FUND SOURCE: TRruis. ENHANCE. FEDERAL HIGHWAY AOHIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONSi 1994 $ 35t
FED SHARE$ 283
GA, SHARE$
71
OTR SHARE$
PE 1994
$
7
ROW LOCL
CONST 1996
$
218
FED SHARE$ lH
GA. SHARE$
u
OTR SHARE$
PE LOCL
ROW NONE $
0
CONST 1996 $ 520
FED SR.ARE$ U6
GA, SHARE$
0TH SHARE$ 104
,
(C/
,, l".
~
~
~
~ (I
E'fffl
===
~el:~~~
~.t!JJ.:a
!f:}~
~,f.,{2'ftl
~(~!~_l,~!
~
~:.-~
I;,<.'.:;::.:::;.<
,
,r.,
GEORGIA OF.rMTMENT or TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 295
COUNTY
DESCRIPTION
FISCAL
COST
P. I. NO.
PROJECT DATA
COMMENTS
YEAR ' !STS
S-U-M-T-E-R----C-I-T-Y--O--PE-R-A-T-E-D---P-U-B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E--------------------------------------------------------------------------------------
38128 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 2
FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISR
OPERATING 1994 $
73
FUND SOURCE: RURAL TRANSIT
FED SHARE$
43
FEDERAL TRANSIT ADHIN FUNDS
GA. SRARE $
0TH SHARE$
30
SUMTER 3812.9
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISH
CONG DIST. 2 FUND SOURCE: RURAL TRANSIT
OPERATING 1995 $ FED SHARE$
.75
FEDERAL TRANSIT ADHIN FUNDS
GA, SHARE$
0TH SHARE$
31
SIJHTER 381250
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISH
CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
OPERATING 1996 $
79
FED SHARE$
u
GA. SHARE$
0TH SHARE$
32
SUMTER 3c228
ONE CONV. VAN/LIFT, 1 STAND. VAN, 2 RADIOS, 1 BASE STATION
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISH
CONG DIST, 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
CAPITAL 1994
$'
59
FED SHARE $- - 47
GA. SRARE $
6
0TH SHARE $-
6
SUMTER 3C2249
ONE STANDARD VAN AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SRARE $
17
FEDERAL TRANSIT ADHIN FUNDS
GA. SRARE $
2
0TH SHARE$
2
SUMTER 321750
SR 30/US 290 FH FELDER ST/CR 307 TOW OF SUN VALLEY DR RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 1.90 HANAGER:_RON BRAZIEL
CONG DIST, 2
GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY ROW 1992 UNDERWAY CONST 1995 $ 3674
FED SHARE $ 2939 GA, SHARE $ 735 0TH SHARE $
SUMTER 322193
SR 3/US 19@ CSX RR S/US 290 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .03 MANAGER: K FULBRIGHT (HI
CONG DIST. 2 GRIP .PROJECT
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 322190 IS AN ASSOCIATED PROJECT.
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
~~nR~IA P~PAPTMENT OF TRAtt5rORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY l994/FY 1996
16-Sep-1993 Page 296
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-SU-M--TE-R-----SR---J/-U-S---1-9-@---H-U-C-R-A-L-O-O-C-H-E-E--C-R-~--N-/-S-R--J-O-B-------------------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-WAY
322197 UHM. or THE EXISTING BRIDGE(SJ. FROM 2 LANES TO 4 LANES.
CONG DIST. 2
ROW NONE $
o
PROJECT MILEAGE : .20
GRIP PROJECT
CONST
.AFTER 96
MANAGER: H GANNAWAY (HI
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADHIN FUNDS
322195 IS AN ASSOCIATED PROJECT.
SUMTER 322210
SR 27 nt SR JO/US 280 EAST TO EAST or SOUTHLJ\ND/DELLWOOD DR
RECONSTRUCTION, WIDENING FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE: .90 MANAGER: RON BRAZIEL
CONG DIST . 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 UNDERWAY ROW 1993 UNDERWAY CONST 1994 $ 668
FED SHARE $ 534 GA. SHARE $ 1J4 0TH SHARE $
SUMTER J22J10
SR 3/US 19 8 BEAR BRANCH S/SR 27
REPLACEMENT or THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .01 MANAGER: H GANNAWAY (HI
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADHIN FUNDS 322195.IS AN ASSOCIATED PROJECT.
Pl!! 1993 ROW NONE
CONST
UNDERWAY
$
0
AFTER 96
SUMTER 322430
SR 27/US 280 EB FH HP 6,7-8.2tlm HP 9.49-8.05
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.94 MANAGER: GORDON BROWN(HI
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
Pl!! 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
SUMTER 322690
SR 27 AT SR 49 IN AMERICUS INTERSECTION IHPROVEHENT / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES:-0 /PROPOSED LANES: 0
MANAGER:
SUMTER 331540
AMERICUS NORTH BYPASS FH SR 3/US 19 TO CR 297 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : '3,23 MANAGER: GORDON BROWN
SUMTER 332088
SR 27 FH CR 250 (HP 15.5) TO SR 195 (HP 24.0J MINOR WIDEN, RESURF / MAINTENANCE PROJECT MILEAGE : 9,30 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROO~
CONG DIST, 2 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 2 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST, 2 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE1994. $
10
ROW 1995 $
10
CONST 1996 $ 289
FED SHARE$ 289
GA. SHARE$
0TH SHARE$
PE 1992 UNDERWAY ROW LOCL CONST 1995 . $ 2067
FED SHARE$ 1654 GA, SHARE$ 413 0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 295
FED SHARE$ 236
GA. SHARE$
59
0TH SHARE$
,.
.. ~
~
lfi!9
~
~
t
-=
~@.~~
~-Jmf~
~~:?:$
~:~,
. if,;t:11'!::!l ~ ~
~
!l',11-0",,'li
,,,~~t;::-~t~:
'' . -..,.
1-- -""
f:;
'
.
/
G0RGIA DPMTHNT or TRANSPORTATION
STAT TRANSPORTATION IHPROVHNTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 297
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEM
ESTS
-SU-M--TE-R----S-R---37-7-/-.A-H--E-R-I-C-U-S-@---G--0-R-G-IA---S-O-U-T-H-W--S-T-E-R-N--M-----------------------------------------------------------------P-E--1-9-8-9-----U-N-D-ER-W--AY
350750 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
CONQ DIST. 2
ROW
J\FTER 96
PROJECT MILEAGE : .38 HJ\NAGER: GORDON BROWN
FUND SOURCE: BRIDGE PROGRAM
CONST
AFTER H
FEORAL HIGHWAY ADMIN FUNDS
SUMTER 37095X
ANDERSONVILLE NATL PRISONR/WM HUSUM ENTRANCE RD/SEE HJ\CON UNl'CNOWN / UNl'CNOWN PROJECT MILEAGE: .00 - EXIST. LJ\NES: 0 /PROPOSED LANS: 0 HJ\NAGER:
SUMTER 42198X
SR 49@ KINCHAFOONEE CAA/SE! TERRELL CO UNKNOWN/ UN~NOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 HJ\NAGER: UNKNOWN
CONG DIST. 2 FUND SOURCE: TRANS. ENHJ\NCE. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY I\DMIN FUNDS 421980 IS .I\N ASSOCIATED PROJECT.
PE LOCL
ROW NONE $
0
CONST 1994 $
0
FED SRME $
GA. SHARE $
0TH SHARE$
PE 1992 UNDERWAY
ROW 1994 $
0
CONST 1995 $
0
FED SHME $
GA. SHARE$
0TH SHARE$
l:F:llP1;1J\ l'F:P/\RTMF.NT or Tl1.J\NSPOl1.T/\TIOII
ST/\TE TRANSPORT/\TION IMPROVEMENTS PROGRJ\M PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 298
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
.COMMENTS
YEAR
_ ESTS
TA-L-B-O-T----C-O-U-N-T-Y--O-P-E-R-A-T-E-D---P-U-B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------
381253 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 2
FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH
OPERATING 1994 $
72
FUND SOURCE: RURAL TRANSIT
FED SHARE$
410
FEDERAL TRANSIT AOHIN FUNDS
GA. SHARE $
0TH SHARE$
32
TALBOT 3812541
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ .OPERATIONS FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISR
CONG DIST, 2
I
OPERATING 1995 $
75
FUND SOURCE: RURAL TRANSIT
FED SHARE$
412
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
33
TALBOT 381255
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH
CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSlT AOHIN FUNDS
OPERATING 1996 $
77
FED SHARE$
43
GA. SHARE$
OTR SHARE$
341
TALBOT 3C2253
ONE STANDARD VAN ANO ONE MOBIL! RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1994
$
21
FUND SOURCE: RURAL TRANSIT
FED SHAP.E $
17
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
TALBOT 3C2254
ONE CONVERSION VAN"NITH LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1995
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT AOHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
TALBOT . 320892
SR 41 FH SR 85E TO HP 0.05/HERI: RESF FM HP 0.05 TO SECONDS
ADDITION OF A PASSING LANE, PROJECT MILEAGE : ,88 MANAGER: GORDON BROWN
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS
PE NONE $
0
ROW 1986 UNDERWAY
CONST 1994 $ 191
FED SHARE $ 153
GA. SHARE $
38
0TH SHARE $
TALBOT 322300
US 80@ BARFIELD CREER E/TAYLOR CO LINE REPLACEMENT OF THE EXISTING BRIDGES(SI. NO ADDED LANES, PROJECT MILEAGE : .25 MANAGER: GORDON BROWN
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHNAY ADHIN FUNDS
PE 1992 UNDERWAY
ROW 1994 $
4
CONST 1995
$ . 818
FED SHARE $ 654
GA. SHARE $ 1641
0TH SHARE $
.. -
...
,, t
.Q
~
~
~'~ ~,. I
E9~fJ3
~
~:rnffi
~,:;:e,
~!}
~~~;\.~
~.~,M~~
~
~!i.~
r,r~,,;:;~;~
i~-;~:.: :_;:
-
GEORGIA OEPMTHENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 299
COUNTY
DESCRIPTION
FISCAL
COST
P.1.NO.
PROJECT OATA
COMMENTS
YEAR . . ESTS
T-A-L-B-O-T----C-R---17-/-G-O-R-K-A-N---R-O-A-D-@---C-S-X--R-A-IL-R-O-A--D--N--C-I-T-Y--L-H-T--O-F--T-A-L-B-O-T-T-O-N-------------------------------------------------P-E--1-9-9-4-----$------10
371280 REPLACEMENT OF THE EXISTING BRIOGES(SI. NO ADOEO LANES.
CONG DIST. 2
ROW LOCL
PROJECT MILEAGE: .21
CONST 1996 $ 374
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 300
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
75
0TH SHARE$
r~F:nP.r, 111 (lEP I\PTMF.NT OF TRANSl"ORTI\T ION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page JOO
T-P-CAO-.LU-II.-NAN-TFOY-!R-. --CO-U--N-TY---O-PE-R-A--T-ED-DP-RE-OPS-UCJE-BRC-LI-TPI-CT-IDO-ATN-RT-AA-N-S-I-T--S-E-R-V-I-C-E---------------------------------.CO-H--H-E-N-T-S--------------------------F-IYS-EC-AA-R-L-------CE-OS-TS-ST--
2B1178 TRANSIT FACILITIES / OPERATIONS
CONG DIST. 11
FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH
OPERATING 1994 $
37
FUND SOURCE: RURAL TRANSIT
FED SHARE$
20
FEDERAL TRANSIT AOMIN FUNDS
GA, SHARE $
0TH SHARE$
17
TALtAFER COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1179 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: TALIAFERRO
MANAGER: STEVE KISR
CONG DIST. 11
OPERATING 1995 $
39
FUND SOURCE: RURAL TRANSIT
FED SHARE$
21
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$
OTR SHARE$
18
TALIAFER COUNTY OPERATED PUBLIC TRANSIT SERVICE
2B1180 TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1996 $
41
FUND SOURCE: RURAL TRANSIT
FED SHAAE $
23
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$
OTR SHARE$
19
TALtAFER ON! CONVERSION VAN WITR .LIFT 2C2178 TRANSIT FACILITIES / CAPITAL
FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1994
$
31
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT AOMIN FUNDS
GA, SHARE$
3
0TH SHARE$
3
TALIAFER ONE STANDARD VAN 2C2179 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1995
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL TRANSIT AOMIN FUNDS
GA, SHARE$
2
0TH SHARE$
2
TJI.LIAFER CR 80 OVER HAP.DEN CREEK NORTH OF SHARON 270800 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .40 MANAGER: D, GRIFFITH
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE 1993 . UNDERWAY
ROW LOCL
CONST 1994 $ 293
FED SHARE$ 234
GA. SHARE$
59
0TH SHARE$
TALIAFER CULVERT EXT@ VAA LOC ON STATE ROUTES .. OGLETH/GREENE
27087Z BRIDGES/ MAINTENANCE
PROJECT MILEAGE : .00
MANAGER: L. "SEABROOK
1.
PE NONE $
0
CONG DIST, 2
ROW 1994 $
0
CONST 1994 $
0
FUND SOURCE: SURFACE TRANSPORT.
FED SR.11.P.E $
FEDERAL HIGHWAY ADMIN FUNDS
GA, SHARE$
270870 IS AN ASSOCIATED PROJECT,
0TH SHARE$
,,
"
~
,.
Cl
~
~
. .. ~..... ~~
~
f~fffia
~:~~
~
~
~;.,t::~
~
~~~
\t,:;:;;,:,.~
i
l-:--
.. .
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 301
T-ACP-OT-,IUT-.NN-NTA-OY-L-L. --SR---7-3-/U-S---3-0-1--FH-DP-RE-ONS-CJE-CR-CLI-TP/G-TL-IDO-EAN-NT-AN-V-I-L-L-E--T-O--E-V-A-N-S--C-O--L-I-N-E------------------------C-O-M-M-E-N-T-S--------------------------FP-IEYS-EC-A1A-R9-L9-2-----O-CEN-DOS-ETS-RTSW--AT
522000 RECONSTRUCTION, NIDENING FROM 2 LANES TO 4 LANES.
CONG DIST, 1
ROW 1995 $ 386
PROJECT MILEAGE: 7.16
CONST
AFTER 96
MANAGER: PETE BLOCKER
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADHIN FUNDS
TATTNALL SR 23@ THOMAS CREER 2 HI SE OF REIDSVILLE
522260 REPLACEMENT or THE.EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: PETE BLOCltER
TATTNALL SR 30/US 280: OVER THOMAS CREER NE OF REIDSVILLE
522620 REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE : .00
MANAGER:
l
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$
5
CONST 1995
$
751
FED SHARE $
601
GA. SHARE $ 150
0TH SHARE $
PE 1995 ROW CONST
$
10
AFTER 96
AFTER 96
TATTNALL SR 147@ OHOOPEE RIVER 4 HI SOUTH OF REIDSVILLE 531290 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,65 MANAGER: PETE BLOCkER
TATTNALL SR 196 OVER BEARD'S CREER, LONG COUNTY 541960 REPLACEMENT OF THE EXISTING BRIDGES(S), N9 ADDED LANES,
PROJECT MILEAGE : ,00 MANAGER:
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 UNDERWAT
ROW 1994
$:-
5
CONST 1995 $ 3722
FED SHARE $ 2978
GA. SHARE $
744
OTR SHARE $
PE 1994 ROW 1996 CONST
$
10.
$
1
:AFTER 96
r.i::r,nr: I/\ l"lF:r/\PTMF:tlT Of" TIUINSNRT/\TION
ST/\TE TRJ\NSPORT/\TION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCJHPTION
-------- P,l,NO,
PROJECT DATA
COMMENTS
T-A-Y-L-O-R----S-R---96--9--B-E-E-C-H-W-O-O-D---SW--A-M--P-,--F-L-IN-T---R-IV-E-R---(-'--C-R-A-N-FO--R-D--C-O-U-N-T-Y-)--- -----------------
-
320950 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES,
CONG DIST. 2
PROJECT MILEAGE : 2.85
GRIP PROJECT
MANAGER: J, GRAYBEAL
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY AOMIN FUNDS
16-Sep-1993 Page 302
FISCAL
COST
YEAR
ESTS
---------------------------
PE 1984 UNOERWA?
ROW NONE $
0
CONST 1996 $ 3929
FED SHARE $ 3143
GA, SHARE $ 786
0TH SHARE $
TAYLOR 322010
SR 3@ FLINT RIVER/ALSO UPSON CO REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .20 MANAGER: H. ASHMORE
(
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS 363558 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1995 $ 2137
FED SHARE $ 1710
GA. SHARE $ 427
0TH SHARE $
,.
,.
"t ...
="'-' ~
~
~
...
~ 14
~
~
~-~..:;:,5
B:'.J~
~ '"'"'"'''"!
1:.;;:ffi
~
~:,#-~~
,~~~:~:::;i.
0
,1,
M
GEORGIA DEPARTMENT or TIU\NSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 303
COUNTY
DESCRIPTION
FISCAL . COST
P,I,NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
TE-L-F-A--IR---C-O-U-N-T-Y--O--PE-R-A-T-E-D---P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------
581318 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 8
FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISR
OPERATING 1994 $
39
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOHIN FUNDS
FED SHARE$
22
GA. SHARE$
0TH SHARE$
Ui
TELFAIR 5B1319
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
51
FUND SOURCE: RURAL TRANSIT
FED SHARE$
29
FEDERAL TRANSIT ADHIN FUNDS
GA, SHARE $
0TH SHARE$
22
TELFAIR 5B1320
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH
CONG DIST, 9
OPERATING 1996 $
54
FUND SOURCE: RURAL TRANSIT
FED SHARE$
31
FEDERAL TRANSIT AOHIN FUNDS
GA. SHARE$
OTR SHARE$
23
TELFAIR 5C2319
ONE CONVERSION VAN "ITR LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
TELFAIR 5C2319
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TELFAIR
MANAGER: STEVE KISH
CONG DIST. 8
CAPITAL 1995
$
29
FUND SOURCE: RURAL TRANSIT
FED SHARE$
23
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
TELFAIR 521570
SR 31/US 441@ ALLIGATOR: BIG HORSE OFLOW: BIG HORSE c~s REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE: .15 MANAGER: H, REYNOLDS
CONG DIST. 9 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 522530 IS AN ASSOCIATED PROJECT,
PB 1999 ROW 1993
CONST
UNDER"AY UNOER"AY AFTER 96
TELFAIR 531105
SR 729/S MCRAE BYP FM SR 30/US 290 SE TO SR 31/US 441
CONSTRUCTION or NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 1.63
MANAGER: K FULBRIGHT (M)
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 UNDER"AY RO" 1994 $ 150 CONST 1996 $ 1913
FED SHARE $ 1450 GA. SHARE $ 363
0TH SHARE $
'
r.r.npr, I II J1F.P/\RTMF:trT OF TRJ\tlSP0RTIITIOtl ST/\TE TRJ\NSP0RTIITION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 304
COUNTT P.I.NO.
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL YEAR
COST ESTS
T-5-E3-2L-5F-6A-0I-R---RSREP-L-3A-0C/-UE-MS-E-N-2T-8-0o-@r---TTR-UI-!R!-N-EP-XI-IM-ST--ICN-RG-E-E-~B-R-1I-D.-2G-l-H!!-SI-(-SI!!-I.-O-NF-O-M-AI-LD-AD-NE-D--L-A-N-E-S-.-----------C-O-N--G-.D-I-S-T-.--8---------------------------R-OP-WE--11-99-99-45-----$$------1170
PROJECT MILEAGE: .23
HANAGER1
FUND SOURCE: BRIDGE PROGRAM
CONST 1'96 $ 583 FED .SHARE $ 4H
FEDERAL HIGH"AY ADHIN FUNDS i~
GA. SHARE$ 117 0TH SHARE$
TELFAIR 542020
IR"INTON A~ AT NORFOL~ SOUTHERN RJ\ILROAD ... 1729122X RR XING / TRAFFIC 'ROJ'ECT MILEAGE: .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER1 WRESTER
!;c:>NG DIST. 8 .
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
PE NONE $
0
ROW NONI!! $
0
CONST 1994 $
84
FED SHARE$
76
GA~ SHARI!! $
8
0TH SHARE$
!.
. .
(I I)
,...
~
~
~ ~1 TM..:.:...~,
~
= ~
~
P-11~~
!l:l&? Wd-""
~
~)
r,;:;~~
t:;:~,:~-ii
r.::i:::,,:::
.., ...
GEORGIA DEPAATHENT OF TRANSPORTATION
STATE TRANSPORTATION IHPROVEHENTS PROGRAMPROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 305
COUNTY P, 1.NO.
DESCRIPTION PROJECT DATA
COHHENTS
FISCAL - COST HAR . ' !STS
T-4-!2R-1R-9-8!L0-L---SR-RE-P-L-4A-9C-@E-M--E~IN-N-TC-H-oA-rF-O-TO-H-NE-E-EE-X-CI-SR-TE-IN-E-G~-/-B-AR-LI-SD-OG--ES-US-M(S-T-)E.-R-N-OC-O-A-D-D-E-D--L-A-N-E-S-.-----------C-O-N-G--D-I-S-T-.--2---------------------------R-OP-WE--11-99-99-24-----U$-ND-E-R-W--AY1
PROJECT MILEAGE : .50
CONST 1995 $ U35
MANAGER: J. LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 1148
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 287
- OTB SHARE $
T!RR!LL 422370
SR 45 AT SR 520 IN DAWSON INTERSECTION IHPROVEHENT / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
P! 1994 $
9
ROW 1995 $
10
CONST 1996 $ 289
FED SHARE$ 289
GA. SHARE$
0TH SHARE$
TERRELL 442570
SR 55 REALIGNMENT FM HP 7 TO HP 7.4 NORTH OF HEROD RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED, PROJECT MILEAGE: ,40 MANAGER:
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE NONE $
0
ROW 1995 $
8
CONST 1996
$
125
FED SHARE$ 100
GA. SHARE$
25
0TH SHARE$
(
1:r,op,:111 l>F.rl\llTMF.NT OF" TRJ\NSN>RT/\TTON
16-Sep-1993
ST/\TE TRANSPORTATION IMPROVEMENTS PROGR.J\H
PROJECT LISTING BY COUNTY FY 1994/FY 1996
Page 306
COUNTY
DESCRIPTION
FISCAL
COST
P, I ,NO,
PROJECT DATA
COMHENTS
YEAR
ESTS
TH-O-M--A-S---S-R---1-22--W--B-H--P--4-.4---T-O--5-.-4-:--E-B--H-P--7-,-3--T-O--8-.-3----------------------------------------------------------------P-E--1-9-9-3-----U-N-D-E-R9-f-AY
421830 ADDITION or A PASSING LANE.
CONG DIST. 2
ROW 1993 UNDER9fAY
PROJECT MILEAGE: 2.00
CONST 1994 $ 816
MANAGER: J. LINDSEY
FUND SOURCE: SURFACE TRANSPORT.
FED SKARE$ 653
FEDERAL HIGH9fAY ADMIN FUNDS
GA, SR.ARE$ 163
0TH SHARE$
TROMAS 421970
SR 38/US 84 BUS@ CSX RR NW/THOMASVILLE REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : 1,00 MANAGER: J. LINDSEY
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNOER9fAY
ROW 1994
$
1
CONST 1995 $ 2124
FED SHARE$ 1699
GA. SH.ARE$ 425
0TH SH.ARE$
THOMAS 431090
SR 133@ PISCOLA CREER Nor BOSTON REPLACEMENT or THE EXISTING BRIDGES(SJ. NO ADDEO LANES.
PROJECT MILEAGE ! .50 MANAGER: J. LINDSEY
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNOER9fAY
ROW 1994 $
1
CONST 1995 $ 751
FED SHARE$ 601
GA. SHARE$ 150
0TH SHARE$
THOMAS U2500
METCALFE ROAD/CR 384 OVER PINE CREER REHAB. OF THE EXISTING BRIDGE(SJ. FROH 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.00 HANAGERt J, LINDSEY (M)
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW LOCL CONST
$
6
AFTER 96
THOMAS U255X
SR 188 OVER BARNETTS CREER SEE GRADY COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE: ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
0
$
0
AFTER 96
THOMAS .450460
CS 245/PINE TREE BLVD@ OLIVE CR/THOMASVILLE REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE: .20 MANAGER:
THOMAS 470693
CR 36/POPE ROAD OVER PISCOLA CREEK REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .10 MANAGER: J. LINDSEY
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
12
ROW LOCL
CONST 1996 $ 388
FED SHARE$ 311
GA. SHARE$
78
0TH SHARE$
PE 1993 UNDER9fAY
RON LOCL
CONST 1995 $ 160
FED SHARE$ 128
GA. SHARE$
32
0TH SHARE$
,, ti
....
~
-~
~= . ., ~
.,,
~
~
~?.2:.(3
~
r#f~fi~~~
~~~i
~~41
c:.:.:iitt*
~
~;;,~-;~
;i;~i:r-0
i;:::,;i:.;~,
.. i
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM -PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 307
COUNTY P, I ,NO,
DESCRIPTION PROJECT DATA
COHHl!:NTS
FISCAL YEM
, , COST ESTS
TIFT
COUNTY OPERATED PUBLIC TRANSIT SERVICE
- -------------------------------
481273 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 8
FUNDS RECIPIENT: TIFT MANAGER: STEVE KISH
OPERATING 1994 $
51
FUND SOURCE: RURAL TRANSIT
FED SHARE$
30
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE $
0TH SHARE$
21
TIFT 481274
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TIFT MANAGER: STEVE KISR
'
CONG DIST, 8
OPERATING 1995 $
53
FUND SOURCE: RURAL TRANSIT
, FED SHARE $
31
FEDERAL TRANSIT ADMIN FUNDS
GA, SHARE$
0TH SHARE$
22
TIFT 481275
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TIFT
MANAGER: STEVE KISH
CONG DIST, 8
OPERATING 1996 $
55
FUND SOURCE: RURAL TRANSIT
FED SHARJ!! $
32
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
23
TIFT 4C2273
ONE CONVERSION VAN WITH LIFT ANO ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TIFT MANAGER: STEVE KISH
CONG DIST, 8
FUND SOURCE: RURAL TRANSIT
CAPITAL 1994
$
32
FED SRAAE $
26
FEDERAL TRANSIT ADHIN FUNDS
GA, SHARE$
3
0TH SHARE$
3
TIFT 410240
I-75 FM N CITY LIMITS OF TIFTON TO TURNER COUNTY LINE RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES,
PROJECT MILEAGE: 8.10 MANAGER: H. ASRHORE(M)
CONG DIST, 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 ROW CONST
ONOERWAY AFTER 96 AFTER 96
TIFT 410490
I-75@ SOUTHWELL BLVD/CR 204 SOUTH OF TIFTON LIGHTING/ ENHANCEMENT PROJECT MILEAGE: 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RON BRAZIEL
TIFT 41053X
I-75 FM CR 246/COOK TO CR 204/TIFT .. SEE COOK COUNTY
UNKNOWN/ UNKNOWN PROJECT MILEAGE :
;oo
-
EXIST.
LANES:
0
/PROPOSED
LANES:
0
MANAGER: UNKNOWN
CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410530 'Is AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
RON NONE $
0
CONST 1994 $ 268
FED SHARE $ 214
GA. SHARE $
54
0TH SHARE $
PE 1993
ROW CONST
UNDERWAY
AFTER 96 AFTER 96
1;r.,,p1:111 or::rl\PTHF:tlT OF TRJ\llSrPRT/\TIOtl
16-Sep-1993
ST/\TF: TRAtlSPORT/\TlON IHPROV'EHENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
Page 308
COUNTY
DESCRIPTION
FISCAL
COST
P. f ,NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
T-I-F-T-------I--7-5--A-T--2-N--D-.S-T-R-E-E-T---A-ND---8T-H---STREET/TIFTO-N---------------l.
------------------------------------------------------------------
PB NONE $
0
410580 LANDSCAPING/ ENHANCEMENT
CONG DIST. 8
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
80
MANAGER:
FUND SOURCE: TRANS. ENHANCE.
FED SHARE$
64
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
24
0TH SHARE$
40
TIFT 422170
SR 125/TIFTON FM 20TH ST TO 40TH ST
TURN LANES/ TRAFFIC PROJECT HILBAGB: 1.05 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER! J. LINDSEY
CONG DIST, B
FUND SOURCE: HWY, SAFETY FEDE~ HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1995 $ 230
CONST 1996 $ 567
FED SHARE$ 510
GA. SHARE$
57
0TH SHARE.$
TIFT 442070
SR 125/TIFT AVE@ CR 413/20TH ST INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,15 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: J. LINDSEY
CONG DIST. B
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PB NONE $
0
ROW LOCL
CONST 1994 $ 139
FED SHARE$ 124
GA. SRARB $
14
0TH SHARE$
,, fl
f1
~
~
. == ~.
,.
~
E\.t}l~j
- ~---~ ~Jifi~ ~
~
~*-~ ~~
~t,;,)ij
.~:-~: .. ,.:<.
''
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 309
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
T-O-O-M--B-S---S-R---4/-U-S---1--9--RO--CK-Y---C-R--K-'--L-IT--T-L-E--R-O-C-K-Y--C-R-K-S--S-/L-Y-O--N-S--------------------------------------------------------P-E--1-9-9-2-----U-N-DE-R-W--AY
522185 REHAB. or THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES.
CONG DIST, 1
ROW NONE $
O
PROJECT MILEAGE: ,40
GRIP PROJECT
CONST
AFTER 96
MANAGER: J, GRAYBEAL(M)
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
522190 IS AN ASSOCIATED PROJECT.
TOOMBS 522225
SR 4/US l 9 COBB CREEK
REHAB. or THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE I 2,00
MANAGER: J, GRAYBEAL
CONG DIST, 1 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 522220 IS AN ASSOCIATED PROJECT.
PE 1993 ONDERWAY
ROW NONE $
0
CONST 1996 $ 275
FED SHARE$ 220
GA. SHARE$
55
0TH SHARE$
TOOMBS 522270
SR 130 9 SWIFT CREEK 1 HI NE or VIDALIA REPLACEMENT or TRE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .50 MANAGER: PETE BLOCKER
CONG DIST, 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDER.WAY
ROW 1994 $
6
CONST 1995 $ 824
FED SHARE$ 659
GA. SHARE$ 165
0TH SHARE$
TOOMBS 522320
SR 30 FH MORNINGSIDE TO BROAD FOOT/NOBLE ST(' 1-WAY PAIR)
CONSTRUCTION or NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 2.15 MANAGER: J. GRAYBEAL(M)
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1995 $ 394 CONST 1996 $ 3705
FED SHARE$ 2964 GA. SHARE$ 741 0TH SHARE$
TOOMBS 532400
CR 364/0LD RIVER RD OVER WILLIAMS CREEK
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,25 MANAGER: PETE BLOCKER
CONG DIST. l
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1995 ROW LOCL CONST
$
8
AFTER 96
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
r;r::oRr.rl\ [lF.PI\RTMF:NT OF TllANSPORTI\TION STI\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COHM!!NTS
TREUTLEN COUNTY OPERATED PUBLIC TRANSIT SERVICE
281183 TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TREUTLEN MANAGER: STEVE RISH
. CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
TREUTLEN COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1184 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT:TREUTLEN MANAGER: STEVE RISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
TREUTLEN COUNTY OPERATED PUBLIC TRANSIT SERVICE
2B1185 TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TREUTLEN
MANAGER: STEVE RISR
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
TREUTLEN ONE STANDARD VAN AND ONE MOBILE RADIO
2C2183 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TREUTLEN MANAGER! STEVE ~ISR
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
TREUTLEN I-16 AT OVERPASS FOR CSX RAILROAD 210610 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER:
r.
TREUTLEN REPLACE BRIDGE CARRYING CSX RR OVER SR 29 .222200 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .40 MANAGER: D. GRIFFITH
CONG DIST. 8 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TREUTLEN SR 29@ RED BLUFF CREER 222205 REHABILITATION OF THE EXISTING BRI[?.GE(S). NO ADDED LANES.
PROJECT MILEAGE : .40 MANAGER: D. GRIFFITH
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 310
FISCAL YEAR
COST . _ESTS
. -----
OPERATING 1994 $
29
FED SRARE $
17
GA. SHARE$
OTR SRARE $
12
OPERATING 199S $
30
FED SHARE$
18
GA. SHARE$
0TH SHARE$
12
OPERATING 1996 $
32
FED SHARE$
19
GA. SHARE$
0TH SHARE$
13
CAPITAL 1994
$
21
FED SHARE$
17
GA. SHARE$
2
. 0TH SHARE $
2
PE 1994 $
17
ROW NONE $
0
CONST 1996 $ 578
FED SHARE$ 520
GA. SHARE$
58
0TH SHARE$
PE 1993 UNDERWAY
ROW 1994 $
5
CONST 1995 $ 1537
FED SRARE $ 1230
.GA. SHARE $ 307
0TH SHARE$
PE 1993 UNDERWAY
ROW 1994 $
10
CONST 1995 $ 319
FED SHARE$ 255
GA. SHARE$
64
0TH SHARE$
..
.. ~
!ft .
~
~
. ~
~
"
~~
ftA>i~
~
~~J
~~
~
~i
~~'1
fi~~~~
~~.,,::....,,
... .,
,, ~-~~
.'
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 311
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL YEAR
COST ESTS
T2-R3-E0-U9-T8-L0-E-N--R-SRE-P-L-4A-6C-@E-M--EPEN-N-TD-o-LE-rT-O-TNH--E-C-ER-EX-EI-RS-T-IN--G--B-R-I-D-G--E-S-(S--).--N-O--A-D-D-E-D--L-A-N-E-S-.-----------C-O-N-G--D-I-S-T-,--8---------------------------R-OP-WE--11-99-99-33-----U$-N-D-ER-W--AY1
PROJECT MILEAGE: .25
CONST 1994 $ 810
MANAGERr D. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 648
FEDERAL HIGHWAY ADHIN FUNDS
GA, SHARE $
162
OTB SHARE $
TREUTLEN SR 171.@ THIGPEN HILL CREEK NE/SOPERTON
231140 REPLACEMENT or THE EXISTING BRIOGES(S). NO ADDEO LANES.
. PROJECT MILEAGE : ,10 MANAGER: D. GRIFFITH
CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1994
$
186
FED SHARE $ 149
GA, SHARE $
31
OTB SHARE $
TREUTLEN SR 46@ RED BLUFF CRK 231190 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .19 MANAGER: D, GRIFFITH
CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
312
FED SHARE$ 250
GA, SHARE$
62
0TH SHARE$
t
COUNTY P.1.NO.
DESCRIPTION PROJECT DATA
1:r.rir,r.111 l'F.Pl\f"ITMF.IIT OF TR/\tlSPORTI\TIC111 STIITE TRJ\tlSPORTIITION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
TROUP 3B1258
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TROUP MANAGERt STEVE ~ISR
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
TROUP 3B1259
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TROUP MANAGER: STEVE ~ISR
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
TROUP 3B1260
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TROUP MANAGER: STEVE ~ISR
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
TROUP 3C2258
ONE CONV. VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TROUP COUNTY MANAGER: STEVE-~ISR
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
TROUP JC2259
TWO STANDARD VANS AND TWO MOBILE RADIOS
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TROUP MANAGER! STEVE ~ISR
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
TROUP 310730
I-185 CONN@ I-85' I-1851 INTERCHANGE CONSTRUCTION INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .85 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M GANNAWAY (M)
CONG DIST. 7 GRIP PROJECT FUND SOURCE: NAT'L.HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 312
FISCAL YEAR
COST . ESTS
-
OPERATING 1994 $
69
FED SHARE$
u
GA. SRA.RE$
OTR SHARE$
28
OPERATING 1995 $
72
FED SRA.RE$
43
GA. SHARE$
OTR SHARE$
29
OPERATING 1996 $
74
FED SRA.RE$
u
GA. SRA.RE$
0TH SHARE$
30
CAPITAL 1994
$
54
FED SRA.RE$
43
GA. SHARE$
5
OTR SHARE$
5
CAPITAL 1995
$
42
FED SRA.RE$
34
GA. SHARE$
4
OTH SHARE $
4
Pl!! 1994 ROW NONE CONST
$' 147
$
0
.AFTER 96
TROUP 311300
SR 219 FM 800' S/I-85 TO 300' N/I-85 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .42
MANAGER: RON BRAZIEL
'
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 331530 IS AN ASSOCIATED PROJECT.
PE 1991 'UNDERWAY
ROW 1993 UNDERWAY CONST 1995 $ 2244
FED SHARE $ 1795 GA. SHARE $ 449 0TH SHARE $
..
,.
it
If
Effl5i
.~
~- . . =~ ~ =c-=
~y~
i;~.ljt*@
~~
~
r~
~~
~~~
\;C:'.;~;;:l
t~~ .:: ... '.~=:
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY P, I.NO,
DESCRIPTION PROJECT DATA
COMMENTS
ALABAMA TROUP CALL BOXES ON I-85 FM
TO SR 74/FULTON .. SEE HARRIS
.
.
31171X UNICNOWN / UNKNOWN PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONG DIST, 7 I 3
MANAGER:
FUND SOURCE: I-STATE HAINT.
FEDERAL HIGHWAY ADMIN FUNDS
TROUP 31172W
CALL BOXES ON I-185 FM SR 22/HUSCOGEE TO I-85, .. SEE MUSCOGEE UN~NOWN / NEW CONSTRUCTION PROJECT MILEAGE I .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER!
CONG DIST. 3 , 7
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
TROUP 321715
SR 14/US 29 FM CR 109/TEAVER RD TO CR 130/0LD AIRPORT RD RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.13 MANAGER! BEN BUCRAN (H)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
.If.
16-Sep-1993 Page 313
FISCAL YEAR
COST ESTS
PE 1994 -;:-----0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$ GA. SHARE$
0TH SHARE$
PE 1994 $
0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA. SHARE$
0TH SRAAE $
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
TROUP 321720
SR 1@ UNNAMED TRIBUTARY TO WEST POINT LAJl:E
REPLACEMENT OF THE EXISTING BRIDGES(S), FROH 2 TO 4 LANES.
PROJECT MILEAGE: ,30 MANAGER! H GANNAWAY
TROUP 322230
SR 14 N,sB FM HP 3,87-5.371 NB HP 7.07-8.41 ADDITION OF A PASSING LANE, PROJECT MILEAGE I 2,94 MANAGER: GORDON BROWN(H)
CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 362920 IS AN ASSOCIATED PROJECT.
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY
ROW 1995 $
17
CONST 1996 $ 920
FED SHARE $ 736
GA. SHARE $ 194
OTR SHARE $
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
TROUP 322240
SR 109 fM I-85 TO I-185 INCL I-85 RAMP RECONSTRUCTION, WIDENING FROH 2 LANES TO 5 LANES.
PROJECT MILEAGE: ,80 MANAGER! H GANNAWAY (HJ
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
TROUP 322250
SR 1/US 27/LAGRANGE FM AUBURN ST TO SR 219/MORGAN ST RECONSTRUCTION, WIDENING FROH 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.42 MANAGER: RON BRAZIEL (H)
CONG DIST. 7 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
ONOERWAY AFTER 96 AFTER 96
r.F:oJ>r; I 11 ()F.r 1\RTHF::IIT OF' TRI\IISPORT 1\T IOtl
STATE TAANSPORtATI9N IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 314
COUNTY
DESCRIPTION
FISCAL
COST
P, I ,NO,
PROJECT DATA
. COMMENTS
YEM
ESTS
TR-O-U-P-----S-R---14--B-T--L-A-G--R-A-N-G-E-/H--O-G-A-N-S-V-I-L-L-E--S-B--H-P--2-3-.-8---2-4-.9-5-:-N--B--2-4-.-9---2-6-.-5----------------------------------------------P-E--1-9-9-2---~U-N-D-ER-W--AY
331400 ADDITION or A PASSING LANE.
CONG DIST. 7
ROW 1994 $
85
PROJECT MILEAGE : 2. 50
CONST
AFTER 96
MANAGER: GORDON BROWN
FUND SOURCE: SURFACE TRANSPORT,
FEDERAL HIGHWAY ADHIN FUNDS
TROUP 331530
SR 219 FM S/CR 91 TO 1000' N/CR 304 (EXCEP IR-85-1(295)) RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : ,78 MANAGER: RON BRAZIEL
TROUP 331800
SR 14 SW OF HOGANVILLE@ SHOAL CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,25 MANAGER:)GORDON BROWN
TROUP 34'2410
SR 109@ FLING/WHITMER RDS-TURN LANE, LOWER RILL CREST
INTERSECTION IMPROVEMENT / TRAFFIC PROJECT MILEAGE : .33 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER! GORDON BROWN
TROUP 350920
SR 109 8 CSX RR WEST or SR 14 INTERSECTION
BRIDGES/ RECST, OR REHAB. PROJECT MILEAGE: 1.00 MANAGER! BEN BUCHAN (HI
TROUP 370902
CR 191 WEST OF MERIWETHER CO LINE@ SULPHUR CRK REPLACEMENT OF THE EXISTING BRIDGES(SI. NO ADDED LANES,
PROJECT MILEAGE: .38 MANAGER: GORDON BROWN
TROUP 370907
CR 418/MOBLEY BRIDGE RD@ YELLow JACKET CRK TRIBUTARY REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .38 MANAGER: GORDON BROWN
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS 311300 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 1174
FED SR.ARE$ 939 GA. SHARE$ 235 OTR SHARE$
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994 $
15
CONST 1994 $ 681
FED SHARE$ 545
GA. SHARE$ 136
0TH SHARE$
CONG DIST. 7,
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1993 UNDERWAY
CONST 1994 $ 252
FED SHARE$ 227
GA. SHARE$
25
0TH SHARE$
CONG DIST, 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY
ROW 1994 $ 400 CONST 1996 $ 2000
FED SHARE$ 1600 GA. SHAP,E $ 400
0TH SHARE$
CONG DIST, 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS.
PE 1992 UNDERWAY
ROW LOCL
CONST 1994 $ 380
FED SHARE$ 304
GA. SHARE$
76
0TH SHARE$
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$
485
FED SHARE $ 388
GA. SHARE$
97.
0TH SHARE$
"
., .-;
;
~
~ ~
~ ,., -,, ~,. e1~Jt1
= ~
~
ffli~
~~
~*' ~:el -
!;<ii~~
(#~~
... \i..-,'.~:;:,. ': ,.'.\.
'
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGIU\H PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 315
COUNTY
DESCRIPTION
FISCAL . COST
P,I,NO,
PROJECT DATA
COHHl!!NTS
YEAR
ESTS
TU-R-N-E-R-----I--7-5--F-M--T-H-E--T--IF-T---CO--U-N-TY---L-IN--E--T-O--S-R--1-5-9------------------------------------------------------------------p-g--1-9-9-5-----$-----2-45
410245 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
CONG DIST. 8
ROW
AFTER 96
PROJECT MILEAGE: 11.07
CONST
AFTER 96
MANAGER: H. ASHHORE(H)
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADHIN FUNDS
TURNER 41024X
I-75 FM N.CITY LIMITS or TIFTON TO TURNER CTY LINE/SEE TIFT
RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE I ,00
HANAGERt R. ASRHORE
TURNER 410250
I-75 FH SR 159 NEAR ASHBURN TO 1 HILES OF CR 117/CRISP RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE: 16.50 MANAGER: H. ASHMORE(H)
CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 410240 IS AN ASSOCIATED PROJECT.
CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1986 ROW CONST
UNDERWAY AFTER 96 AFTER 96
PE 1987 ROW CONST
UNDERWAY AFTER 96 AFTER 96
TURNER U0590
I-75 REST AREAS 19,110 IMPROVE SANITATION, LIGHTS, PARKING REST AREA / RECST. OR REHAB, PROJECT MILEAGE: .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER:
TURNER 43104X
SR 90 8 ALAPAHA RIVER/SEE BEN HILL COUNTY
UNICNOWN / UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNICNOWN
TURNER 431300
SR 32 OVER LITTLE SAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE: .00 MANAGER:
CONG DIST, 8 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 431040 IS AN ASSOCIATED PROJECT.
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
50 0
1600 1440
160
PE NONE $ ROW 1994 $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 7700 18500 14800 3700
PE 1995 ROW CONST
$
10
AFTER 96
AFTER 96
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
r.F:f)Rl";JA ClF:rARTMF:IIT OF TRJ\NSrORTATIQN STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY.FY 1994/FY 1996
COMMENTS
TWIGGS 381442
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIP.IENT: TWIGGS MANAGER: STEVE KISH
CONG DIST. 11, 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
TWIGGS 381 3
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TWIGGS MANAGER: STEVE KISH
CONG DIST, 11, 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
16-Sep-1993 Page 316
FISCAL YEAR
COST . !STS
.
OPERATING 1994 $
21
FED SHARE$
13
GA, SHARE$
0TH SHARE$
e
OPERATING 1995 $
21
FED SHARE$
13
GA. SHARE$
OTR SHARE$
e
TWIGGS 381.44
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TWIGGS
MANAGER: STEVE KISH
CONG DIST. 11, 8
OPERATING 1996 $
22
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
13
GA. SHARE$
0TH SHARE$
9
TWIGGS 22207X
SR 87/US 23 FM S/BOLLINGER CM TO SR 96 . SEE BLECKLEY CO UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER I UNKNOWN
CONG DIST, 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 222070 IS AN ASSOCIATED PROJECT,
PE NONE ROW 1994 CONST
$
0
$
0
AFTER H
TWIGGS 1-16 FH JCT I-75 TO TWIGGS/BLECKLEY CL,,,BIBB
PE NONE $
0
31168Z RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST, 8
ROW 1994 $
0
PROJECT MILEAGE: 31,70 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE HAINT,
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
311685 IS AN ASSOCIATED PROJECT,
0TH SHARE$
TWIGGS 321990
SR 96 BT HOUSTON CL, I-16( @ 5 LOC(2EB, 2ND' 1-REAL~~N) ADDITION OF A PASSING LANE, PROJECT MILEAGE : 6.15 MANAGER: GORDON BROWN
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY RON 1993 UNDERWAY CONST 1995 $ 2433
FED SKARE $ 1946 GA. SHARE $ 487 0TH SHARE $
TWIGGS 331840
SR 96 NB FM HP 16.2 - 17.81 SB MP 16.3 - 17.8 ADDITION OF A PASSING LANE.
PROJl:CT MILEAGE : 3.10
MANAGER: GORDON BRONN
CONG DIST, 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
RON 1994 $
93
CONST 1996 $ 1334
FED SHARE $ 1067
GA. SHARE $ 267
0TH SHARE $
,.
,, ,.
.~ ....
~
~
~ ~ 'I t
~~
~
ffitt~~
~~
~
~~
~~ ~ 'j;;';:,;;~"ii
~,ii:;
t::C:,:-;;
.' ..
GEORGIA DEPMTHENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 317
COUNTY
DESCRIPTION
FISCAL. . COST
P,I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
U--N-IO-N-----C-R---1-/P-A-T---C-O-LW--E-L-L--R-D--O-V-E-R--N-O-T-T-E-R-L-Y--R-I-V-E-R--N-W--B-L-A-I-R-S-V-I-L-L-E---------------------------------------------------P-E--1-9-9-3-----U-N-D-E-R-"A-Y
170870 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES.
CONG DIST. 9
ROW LOCL
PROJECT MILEAGE : ,15
CONST 1995 $ 1254
MANAGER! L. OWENS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 1003
FEDER.AL HIGH"AY ADMIN FUNDS
GA. SHME $ 251
OTR SHARE$
UNION 170871
CR 1/PAT COLWELL RD OVER YOUNGCANE CREEK" OF BLAIRSVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE I ,15 MANAGER: L. OWENS
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGH"AY ADMIN FUNDS
PE 1993 UNDER"AY ROW LOCL
CONST 1995 $ 782 FED SHARE$ 626 GA, SHARE$ 156 0TH SHARE$
,..-
r.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
r.F:OPr. t I\ ()f:P/\RTMF:NT Of' TRJltlSf'C>PTI\T ION STI\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY ry 1994/rY 1996
COMMENTS
UPSON 321730
SR 36:1 "8, 2 EB PPL; TL@ 2 LOCATIONS
ADDITION or A PASSING LANE.
PROJECT MILEAGE : 4.20 MANAGER! GORDON BROWN
.
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL RIGH9fAY ADMIN FUNDS
UPSON 321860
SR 36@ l)YAHAHA PK9'Yt2,3)@ INDUSTRIAL PARK14)MOORES XING RD
TURN LANES/ TRAFFIC PROJECT MILEAGE : 1.20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
UPSON 32201X
SR 3/US 19@ FLINT RIVER SEE TAYLOR COUNTY UNKNOWN/ UN~OWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: H GANNAWAY
UPSON 322270
SR 22 SPUR@ AUCHUHPKEE CME/SR 3 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .25 MANAGER: GORDON BROWN
CONG DIST. 3 GRIP PROJECT FUND SOURCE: BRIDGE PROGR.AH FEDERAL HIGHWAY ADHIN FUNDS 322010 IS AN ASSOCIATED PROJECT.
CONG DIST. 3
FUND SOURCE: BRIDGE PROGR.AH FEDERAL HIGHWAY .ADMIN FUNDS
16-SPp-1993 Page 318
FISCAL
COST
------ YEAR
l!:STS
P-E---1-9-9-2-. --.UNDERWAY
ROW 1993 UNDERWAY
CONST 1994 $ 1357 FED SHARE$ 1086
GA. SHARE $ 271
OTR SHARE$
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995
$
399
FED SHARE $ 359
GA. SHARE $
40
OTR SHARE $
PE NONE $
0
ROW 1994 $
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
OTR SHARE$
PE 1992 ROW CONST
UNDERWAY
AFTER 96 AFTER 96
UPSON 322550
SR 74 FH HOLSTUN OR TOE OF ELEMENTARY DR IN THOMASTON RECONSTRUCTION, "IDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .99 MANAGER: GORDON BROWN(H)
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 250 AFTER 96
UPSON . 322700
SR 74 FM ROLSTON DRIVE TO UPSON ELEMENTARY IN THOMASTON INTERSECTION IHPROVEHENT / TRAFFIC PROJECT MILEAGE: .96 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
UPSON 331950
DELRAY RO/CR 425 FM SR 3 TO SR 36 RECONSTRUCTION' WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.90 MANAGER: GORDON BROWN(HI
CONG DIST. 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
14
ROW 1995 $
10
CONST 1996 $ 474
FED SHARE$ 474
GA. SHARE$
0TH SHARE$
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
.
;
,.
~
&J,.L.,,~
~
,,,
11:
~ 11
-....
"""'-'--.i"",,'1
~
~~
~~
'~1~
. ~ ~?4\
ji:~-.i.~i
~ii~
r,:,.~;_::,.i
-:~; ~<
l
GEORGIA OEPAATHENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 319
COUNTY
OESCRIPTION
FISCAL
. COST
P. I .NO,
PROJECT OATA
--- ----- ------- ----------- - UPSON SR 3/US 19@ JEFF OAVIS/HARP RO IN THOMASTON
COMMENTS
YE.All
ESTS
-----------------------------------------------------------------------
PE NONE $
0
342790 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 3
ROW 1994 $
5
PROJECT MILEAGE : ,15 - EXIST. LANES: 4 /PROPOSEO LANES: 6
GRIP PROJECT
CONST 1994
$
107
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
FED SHARE$
96
FEOERAL RIGHWAY ADMIN FUNOS
GA. SRARE $
11
0TH SRARE $
UPSON 371200
CR 214/ANOREWS CHAPEL RO. 9 SWIFT CREE~ 3 HIE OF THOMASTON REPLACEMENT OF TRE EXISTING BRIOGES(S). NO ADOEO LANES. PROJECT MILEAGE : .19 MANAGERt
CONG 01ST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
5
ROW LOCL
CONST 1996
$
173
FED SRARE $ 138
GA. SHARE$
35
0TH SRARP.: $
UPSON 371205
CR 164/NEW RARMONY RO@ WOLF C~ S OF THOMASTON REPLACEMENT OF TRE EXISTING BRIOGES(S). NO ADOED LANES. PROJECT MILEAGE : ,19 MANAGER:
CONG 01ST, 3
FUND SOURCE: BRIOGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
5
ROW LOCL
CONST 1996 $ 173
FEO SRARP.: $ 138
GA. SH.ARE$
35
0TH SRARP.: $
UPSON 371270
SCENIC RIGRWAY/US 19: RISTORICAL SILVERTOWN HILL VILLAGE
RIGHTS-OF-WAY/ ENHANCEMENT PROJECT MILEAGE: ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG 01ST. 3
FUND SOURCE: TRANS, ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS
PE 1996 ROW CONST NONE
$
8
AFTER 96
$
0
'
G~UPGIA n~rARTMtNT Of TRMJsrnnTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 320
COUNTY
DESCRIPTION
FISCAL
COST
p, I .NO,
PROJECT DATA
.
COMMENTS
YEAR
.. !STS
W-A-LK-E-R----C-O-U-N-T-Y--O-P-E-R-A-T-E-D---PU--B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------
681383 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 9
FUNDS P.ECIPIENT: WALKER MANAGER: STEVE KISH
OPERATING 1994 $
59
FUND SOURCE: RURAL TRANSIT
FED SHARE$
34
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
25
WALKER 681384
COUNTY OPERATED PUBLIC TRANSITSERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
61
FUND SOURCE: RURAL TRANSIT
FED SHARE$
35
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
26
WALKER 681385
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996 $
65
FED SHARE$
37
GA, SHARE$
0TH SHARE$
29
WALKER 6C2383
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WALKER
MANAGER: STEVE KISH
CONG DIST, 9
CAPITAL 1994
$
28
FUND SOURCE: RURAL TRANSIT
FED SHARE$
22
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
WALKER 6C2384
ON! CONVERSION VAN
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1995
$
29
FUND SOURCE: RURAL TRANSIT
FED SHARE$
23
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
WALKER 6C2385
TWO CONVERSION VANS TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH
WALKER 621190
CHICltAMAUGA BYP FM US 27 @CR 219 TON or LYTLE RO CONSTRUCTION or NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 3.20 MANAGER: M GANNAWAY
CONG DIST, 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CHATTANOOGA TIP I 1
CONG DIST, 9 GRIP PROJECT FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
CAPITAL 1996
$
57
FED SHARE$
46
GA. SHARE$
5
0TH SHARE$
6
PE 1992 UNDERWAY ROW 1992 UNDERWAYCONST 1994 $ 16020
FED SHARE $ 12015 GA. SHARE $ 4005
OTH SHARE $
...
.
~- {;
~
~
~. . ~~:-., ~:-. = (,~
l
~..
~~
~~
""''"""ii
~~
~
~_,i,~
fii:;~(::Jii !i/:;:--:,
' ..
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 321
COUNTY P,I.NO,
DESCRIPTION PROJECT DATA
1
COMMENTS
FISCAL YEAR
.. COST ESTS
W-A-L-K-ER----C-H--IC-l{-A-H-A-U-G-A---B-Y-P--F-H--N--L-Y-T-L-E--R-D-/-C-R--7-1-0--T-O--U-S--2-7--@-S-R--2-/C-A--T-O-O-S-A-------C-H-A-T-T-A-N-O-O-G-A--T-I-P--I--1---------------------P-E--N-O-N-E-----$------0
621192 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
CONG DIST. 9
ROW NONE $
0
PROJECT MILEAGE : 4. 60
GRIP PROJECT _
CONST 1994
$ 17603
MANAGER! H GANNAWAY
FUND SOURCE: STATE FUNDS
FED SRA.RE $ 13202
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$ UOl
62Yl92 IS AN ASSOCIATED PROJECT.
0TH SRA.RE$
WALKER 621650
SR 136 EB HP 21.4-22.8tEB 25.7-26.61"8 26.6-28.0 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.70 MANAGER! BILL MCVEY (H)
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
Pl!! 1992 ROW
CONST
UNDERWAY AFTER 96 AFTER 96
WALKER 630990
SR 337@ DUCK CREEK
REHABILITATION or THE EXISTING BRIDGE(S). NO ADDED LANES.
PROJECT MILEAGE : .10
MANAGER: BILL.MCVEY
WALUR 63107X
BURIUIALTER GAP RD EXT FM SR 189/DADE TO CR 392/SEE DADE CO
UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNICNOWN
.
WALKl!!R 631240
SR 341 FM GLASS HILL RD/CR 166 TO GORDON ST
TURN LANES/ TRAFFIC PROJECT MILEAGE : .50 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: BILL MCVEY (H)
"ALKER 631440
SR 1 AT LEE/GORDON HILL ROAD SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
WALKER 641810
SR 1/US 27 FH 1000' S/CR 220/LEE GORDON RD TO 800' N/CR 220 .ADDITION OF A PASSING LANE. PROJECT MILEAGE : ,34 MANAGER: BILL MCVEY
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 631070 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP I 17
CONG DIST. 9 FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
PE 1988 UNDERWAY
ROW 1990 UNDERWAY
CONST 1995 $ 250
FEDSHARE $ 200
GA. SHARE$
50
0TH SHARE$
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
PE 1992 ROW
CONST
UNDERWAY
AFTER 96 AFTER 96
CHATTANOOGA TIP I 21
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CHATTANOOGA TIP I 4
CONG DIST. 9 GRIP PROJECT FUND SOURCE: SURFACE TRANSPORT, FEDERAL_ HIGHWAY ADHIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1996 $
u
FED SHARE$
51
GA. SHARE$
13
0TH SHARE$
PE 1993 UNDER"AY
ROW 1994
$
100
CONST 1995 $ 363
FED SHARE $ 290
GA. SHARE $
73
0TH SHARE $
r.r::n11.r:11\ (1F:rl\PTMF:IIT ()f TRJ\t1SP0RTI\TION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
---- P,I.NO,
PROJECT DATA
W--A-L-lt-tR----S-R--1-9-3--O-V-E-R--W--E-ST--C-R-I-C-IU-\-M-A-U-G-A---C-R-E-E-lt-----------------------------------
- - COMMENTS
-
Ctl960 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES.
CONG DIST, 9
PRQ~C~ MILEAGE : ,00
MANAGER:
FUND SOURCE: BRIDGE.PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 322
FISCAL
COST
---Y-E-M- ------E-ST-S---
PE 1994 $
10
ROW 1996 $.
1
CONST
AFTER 9fi
. r:
WALltER 650t90
MCFARLAND AVE AT WEST LAKE, MAPLE, JAMES ST, REVERSE LN SYS SIGNALS/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: .BURT RIDDLE
CHATTANOOGA TIP I 20
~Ot;IC? DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1994 $
10
ROW NONE $
0
CONST ..1995 $ 425
FED SHARE$ 340
GA. oTil
SsHHAARREE$$
85
. I .,
,,
~ #0
E$
&f!J
~
(._,
11.
~ tl
=, ; = . !
-~~
=w,=;;i
~J.5
1~ ",StP,C,""'1
(I~;;., ~ ,~1i~m-
t:
~~;,~~
[,.:~,'.~.~~
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPI\RTHENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996.
COMMENTS
WALTON 181049
CITY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF SOCIAL CIRCLE MANAGER: STEVE RISH
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
WALTON 1B1049
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS ltECIPIENT: CITY'OF SOCIAL CIRCLE MANAGER: STEVE RISR
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT J\DMIN FUNDS
WALTON 181050
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY or SOCIAL CIRCLE
MANAGER: STEVE RISR
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
WALTON 122560.
SR 91 AT MONROE YOUTR/CENTERHILL CHURCR ROAD TURN LANES/ TRAFFIC PROJECT MILEAGE: .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:
WALTON 122570
l
SR 10/US 79 MONROE TO ATHENS MEDIAN OPENINGS MEDIAN WORK/ TRAFFIC -PROJECT HILEAGE: 16,00 - EXIST, LANES: 4 /PROPOSED LANES: 4 MANAGER:
CONG DIST. 10 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHNAY ADHIN FUNDS
...
16-Sep-1993 Page 323
FISCAL COST
YEAR
ESTS
-. ------------------
OPERATING 1994 $
29
FED SRARE $
17
GA. SHARE $
0TH SHARE$
11
OPERATING 1995 $
29
FED SHARE$
17
GA. SHARE$
0TH SHARE$
12
OPERATING 1996 $
30
FED SHARE$
18
GA. SHARE$
0TH SHARE$
12
PE NONE $
0
ROW 1995 $
1
CONST 1996 $' 109
FED SRARE $
99
GA, SRARE $
11
0TH SHARE$
PE 1994 ROW NONE CONST
$
10
$
0
AFTER 96
WALTON 132HX
SR 10 FM ALCOVY RIVER/WALTON THRU OCONEE TO SR 8/CLARRE
GUARDRAIL/ TRAFFIC PROJECT HILEAGE: 10.10 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER
WALTON 132350
SR 10 AT CHERRY HILL ROAD
INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .28 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: L. OWENS
PE 1994 $
0
CONG DIST. 10
ROW NONE $
0
CONST 1996 $
0
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
FEDERAL HIGHWAY J\DMIN FUNDS
GA. SHARE$
132340 IS AN ASSOCIATED PROJECT.
0TH SHARE$
CONG DIST. 10
FUND SOURCE: HWY, SAFETY ~EDERAL HIGHWAY J\DMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 130
FED SRARE $ 117
GA, SHARE$
13
0TH SHARE$
r.F.tlPr. I" ('lf:PAFTMF.llT OF TRAtrsrcJRTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P. I .NO.
PROJECT DATA
W--M-.T-O-N----S-R---B-l -A-T--S-R--2-0---IN---L-O-G-A-N-V-I-L-L-E---------------------------------------
COMMENTS
- -----------
1t1860 TURN LANES/ TRAFFIC
CONG DIST. 10
PROJl!CT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER!
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADHIN FUNDS
WM.TON 170750
CR 162/COUNTY LINE RD@ ALCOVY RIVER
REPLACEMENT or THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
PROJECT MILEAGE l .22
HANAGER1 L. OWENS
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
WM.TON 170751
CR 162/COUNTY LINE RD@ BIG FLAT CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJl!CT MILEAGE: .22 HANAGERI L. OWENS
CONG DIST. 10
.FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
l
16-Sep-1993 Page 324
FISCAL
COST
--
YEAR
ESTS
--PE---1-9-H------$------u
ROW 1995 $
10
CONST 1996 $ 578
FED SKARE$ 520
GA. SHARE$
58
0TH SHARE$
P! 19BB UNDERWAY
ROW LOCL
CONST 1994 $ 470
FED SHARE$ 376
GA. SHARE$
H
0TH SHARE$
PE 1988 UNDERWAY
ROW LOCL
CONST 1994 $ 369
FED SHARE$ 295
GA. SHARE$
7t
0TH SHARE$
.
,.
'<-
,..
l!l!l1!B
~
~ ,.. ~ 1, - ~ ('
~
~
lffl!i;(i')~
~
,--~~~ ~~~~.:.:it~ ~~
tf,jirq
~;1:~~~i
coUNTY P. I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DErARTHENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
WARE 422125
SR 38/US 84@ SUWANNEE CRR RERAB, OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: N, PASSMORE (M)
CONG DIST. 1
GRIP PROJECT FUND SOORCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS
. ..
16-Sep-1993 Page 325
FISCAL
-
YEAR
PE 1996
ROW NONE
CONST
- COST ESTS
$
11
$
0
AFTER 96
WAR! 521530
SR 4/US 1/WAYCROSS FM N/BLACRSHEAR AVE TO CR 465@ JAMESTOWN
RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.51
MANAGER: PETE BLOCRER
r.
CONG DIST, 1 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
WAR! 522775
SR 38/US 84 OVER GREASY BRANCA, LITTLE, BIG ALLIGATOR CREER RERAB, OF TR! EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES;
PROJECT MILEAGE : .00 MANAGER! H GANNAWAY (HI
WAR! 570980
RESTORE DEPOT, RAILWAY EXPRESS IN WAYCROSS MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT, PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 522770 IS AN ASSOCIATED PROJECT.
CONG DIST. 1
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS
PE 1995 ROW NONE CONST
$
30
$
0
AFTER 96
PE 1994 $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
80
0
1170 936 16 250
GF.0Rf;l1\ PF.F'l\RTMF.NT or TIU\tlSF'ORT!\TION
ST!\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
1_6-Sep-1993 Page 326
COUNTY
DESCRIPTION
P.1.NO.
PROJECT DATA
"-A-A-R-E-N-----C-O-U-N-T-Y--O-P-ERATED PU--B-L-IC---T-R-A-N-SIT
'-.
FISCAL
COST
SERVICE-----------------------------------C-O-M-M-E-N-T-S----------------------------Y-EA-R--~----. -E-S-T-S
281188 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 11
FUNDS RECIPIENT: ffARREN MANAGER! STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $ FED SHARE$ GA. SHARE$
39 23
0TH SHARE$
u
WARREN 2Bll89
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS MCIPIENT: WARREN MANAGER! STEVE KISH
CONG DIST. 11
FUND SOURCE:.RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
OPERATING 1995 $
FED SHARE$ GA. SHARE$
u
241
0TH SHARE$
17
WARREN 281190
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WARREN
MANAGER! STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
OPERATING 1996 $
413
FED SHARE$
25
GA. SHARE$
0TH SHARE$
18
"All.REN 2C21BB
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENTi WARREN MANAGER: STEVE ~ISH
CONG DIST, 11
CAPITAL 1994
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE$
u
r.
FEDERAL TRANSIT ADHIN FUNDS-
GA. SHARE$
2
0TH SHARE$
2
WARREN 2C2189
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ffARREN MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1995
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
"ARREN 221620
SR 17@ REEDY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE: ,30 MANAGER: D. GRIFFITH
CONG DIST,- 11
GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 221575 IS AN ASSOCIATED PROJECT.
PE 1992 ROff NONE CONST
UNDERWAY
$
0
AFTER 96
ffARREN 222390
SR 16 OVER GOLDEN CREEK IN WARRENTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: ,DO MANAGER:
CONG DIST, 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHffAY ADHIN FUNDS
PE 1994 ROW 1996
CONST
$
10
$
1
AFTER 96
~
"'
., ,..,
~
~
~ ~ lzf'~
t
,,.
~
~ID~U!
li~.1:~
o~ ,,-w.;tl
~~ ~
i:!~J~~
.~i::~$~~
~,:,;::,~,~
. ..
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 327
COUNTY
DESCRIPTION
FISCAL .. COST
P, I.NO,
PROJECT DATA
COMMENTS
YEAR
1!:STS
WASRINGT COUNTY OPERATED PUBLIC TRANSIT -SE-R--V-IC-E-----------------------------------------------------------------------------------
281503 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 11
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH
OPERATING 1994 $
32
FUND SOURCE: RURAL TRANSIT
FED SHAAE $
19
FEDERAL TRANSIT AOHIN FUNDS
GA, SHARE$
0TH SRAAE $
13
WASHINGT COUNTY OPERATED PUBLIC TRANSIT SERVICE 281504 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1995 $
40
FUND SOURCE: RURAL TRANSIT
FED SAME$
23
FEDERAL TRANSIT AOHIN FUNDS
GA. SHARE$
OTR SHARE$
17
WASRINGT COUNTY OPERATED PUBLIC TRANSIT SERVICE 281505 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1996 $
n
FUND SOURCE: RURAL TRANSIT
. FED SHARE $
27
FEDERAL TRANSIT AOHIN FUNDS
GA. SHARE$
OTR SHARI!!$
20
WASHINGT ONI!: CONVERSION VAN, ONE H081LI!: RADIO ANO ONE BASE STATION
2C2503 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1994
$
38
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
FED SHARE$ GA. SHME $ 0TH SHARE$
30
WASHINGT ONI!: STANDARD VAN AND ONE MOBILE RADIO 2C2504 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT AOHIN FUNDS
GA. SHME $
2
OTR SHARE$
2
WASRINGT ONE STANDARD VAN AND ONE MOBILE RADIO
2C2505 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1996
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADHIN FUNDS
GA. SHME $
2
0TH SHARE$
2
WASHINGT SR 15: NB HP 28.1-29.6/WASHINGTON//SB HP 1.0-2.5/RANCOCK
222300 AODITION'OF A PASSING LANE. PROJECT MILEAGE : 3,00 MANAGER: D. GRIFFITH
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS
PE 1995 ROW CONST
$
45
AFTER 96
AFTER 96
r.F:nnr; I 11 l"'F:P 1111TMF:IIT OF TIU\IISPO!lTIIT JON
16-Sep-1993
STIITE TRJ\IISPORTATION IMPROVEMENTS PROGRAM
Page J28
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
W--A-S-R-IN-G-T--C-R---3-57--A--T-S-T-E-E-L---C-R-E-E-~--S-O-U-T-H--O-F--D-A-V-I-S-B-O-R-O-----------------------------------------------------------------P-E---1-9-9-6--~-$------6
242150 .REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES,
CONG DIST. 11
ROW LOCL
PROJECT HILEA~E: ,20
CONST
AFTER 96
MANAGER! D. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY 1\DHIN FUNDS
. .. .
r,
.
' ...
-
~
~., . ~-- == .
~ ~ ~ ""== f~--:~~~ Mt$ i!;~:;:grJ ,;.!r,l~s!... ea.fa,~ ~frfui frc:~,;::~ :-.. .---~-:i
... ..
GEORGIA DEPARTMENT or TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 329
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
, COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
W-5-3A-1Y0-N9E-2----CR-R-EP-L-3A8-C8-/E-0M-D-EUN-H-T--oR-Dr--ST-OH-EU-T-EH-X@-I-S-TL-IINT-G-T-L-EB-R-SI-AD-TG-I-LE-LS-A(S--)C.-R-KN-O--A-D-D-E-D--L-A-N-E-S-.-----------C-O-N-G--D-I-S-T-.--1---------------------------R-OP-WE--1L-O9-8C-9L-----U-N-D-ER-W--AY
PROJECT MILEAGE: ,20
CONST 1994 $ 530
MANAGER! PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ Ut
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 106
0TH SHARE$
WAYNE 532t20
Sil 169 AT CR 392 NW or JESUP
INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,49 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: PETE BLOCKER
CONG DIST. l
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
10
ROW LOCL
CONST 1994 $ 2U
FED SHARE$ 218
GA. SHARE$
2t
0TH SHARE$
(
r.r,nn,; I II (lEPI\RTMENT Or TRJ\Jl;,PORTI\T 1011 STI\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 330
W-3CP-2EO2-,BIU6-S.N0T-NET0-OYR--. -PRS-RRE-PO-L2-JAE7-CC/-UET-MS-ME-N2-ILT8-E0-AO-GO-FEDP-VR-TEEHR-OS:-ECJE-CR.oC-HEIoT-POXT-CII-SDTOT-AON-ITHNA-AG-T-C-BR-ER-EI-DCGREE-ES-K(-$-)-, --NO---A-D-D-ED---L-A-N-E-S-.-----------C-O-N-G--D-CI-OS-MT-M.--E2N-T-S------------------------C-O-RNO-FPSWE-ITYS-ECA-11A-R99L-9946---A$$-CEF-TSO-ETSR-ST--9160l
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
... .. .,
.- ...
.. .,,
,
-
~
~. ---~
~
~
~
~ I&,-=-=
A.!!1.J.f.t!
IH~ ,,~. zi llii:~'ri~ 'C':.,:.
~ .. ;~;Ji
1~:.::~,:-~
COUNTY P,l,NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT-LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
WHEELER 581323
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
WHEELER 5B1324
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
WHEELER 581325
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT
l
FEDERAL TRANSIT ADMIN FUNDS
WHEELER 5C2323
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
WHEELER 5C2324
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FED.ERAL TRANSIT ADMIN FUNDS
WHEELER 522110
SR 30@ ALLIGATOR CREER
REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE: .15 MANAGER: PETE BLOCKER
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
WHEELER 531250
REPLACE TRUSS.SECTION@ OCONEE RIVER ON SR.46
REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER: PETE BLOCKER
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
... ""
16-Sep-1993 Page 331
FISCAL
COST
YEAR
ESTS
-----------------
OPERATING 1994 $
23
FED SHARE$
14
GA. SHARE$
0TH SHARE$
9
OPERATING 1995 $
36
FED SHARE$
21
GA. SHARE$
0TH SHARE$
15
OPERATING 1996 $
38
FED SHARE$
22
GA. SHARE$
0TH SHARE$
16
CAPITAL 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
- 31
25 3 3
CAPITAL 1995
$
29
FED SHARE$
23
GA. SHARE$
3
0TH SHARE$
3
PE 1992 UNDEP."AY
ROW 1994 $
5
CONST 1994 $ 1350
FED SHARE $ 1080
GA. SHARE $ 270
0TH SHARE $
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1994 $ 800
FED SHARE $ 640
. GA. SHARE $
160
0TH SHARE $
~E0P~TA nEPARTMENT or TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 332
---- COUNTY
P.I.NO. WHITE
SR
17
FM
Sor
DESCRIPTION PROJECT DATA
SR 356 TON OF
SR
FISCAL
COST
7-5--A--L-T----------------------------------C-O-M-M-E-N-T-S--------------------------P-EY-E-AN-RO-N-E---.$ESTS
O
121740 TURN LANES/ TRAFFIC
CONG DIST. 9
ROW 1990 UNDERWAY
PROJECT MILEAGE: .35 - EXIST. LANES1 2 /PROPOSED LANES: 3
CONST 1995 $ 392
MANAGER: L. ONENS
FUND SOURCE: HWY. SAFETY
.FED SHARE$ 353
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$
39
0TH SHARE$
WHITE 12224X
SR 11/US 129 FM SR 284/HALL TO CLEVELAND BYP .. SEE HALL CO RECONSTRUCTION' WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE: .OO MANAGER: UNKNOWN
WHITE 162390
r
CLEVELAND WEST BYP FM SR 115 W/CLEVELAND-SR 11 @HULSEY RD CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE: 1.80 MANAGER! RON BRAZIEL (M)
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 122240 IS AN ASSOCIATED PROJECT.
PE 1992 ROW
CONST
UNDERWAY AFTER 96
AFTER 96
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
90
:AFTER 96
WHITE 170880
CR 31/TOM TEAQUE. RD@ MOSSY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. PROJECT MILEAGE: .20 MANAGER: L. ONENS
WHITE 1'70881
CS 613/LORELY RD OVER CHATTAHOOCHEE RIVER IN HELEN REPLACEMENT OF THE EXISTING BRIDGES(S). FROM l TO 2 LANES.
PROJECT MILEAGE I .19 MANAGER! L. ONENS
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1994. $ 166
FED SHARP.:'$ GA. SRAAE $
133 33.
0TH SRA.RE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1994 $ 306
FED SHARE$ 245
GA. SHARE$
61
0TH SHARE$
... ..
t
~:
-. C. .....
-
\BB
~",
.
we
.
.
~
= ~
~
~
~ ~
~
~-.;._ lie~~
~~~~~i
tt;~~~r"~
i::': :::,
i:
.
,,
GF.ORGIA DEPARTMENT-or TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 333
COUNTY
DESCRfPTION
FISCAL . COST
P,I.NO,
PROJECT DATA
COMMENTS
YEAR . ESTS
W-H-I-T-F-IE-L--C-O-U-N-T-Y--O--P-E-IU-\-T-E-O---P-U-B-L-t-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------
6B1388 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: WHITFIELD MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
OPERATING 1994 $ 171 FED SHAAE $ 103 GA. SHARE$
0TH SHARE$
69
WHITFIEL COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1399 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT! WHITFIELD MANAGER! STEVE KISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ 176
FED SHARE$ 106
GA. SHARE$
0TH SHARE$
70
WHITFIEL COUNTY OPEIU\TED PUBLIC TRANSIT SERVICE 6B1390 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WHITFIELD MANAGER! STEVE KISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996 $ 195
FED SHARE$ 111
GA. SHAAE $
0TH SHARE$
74
WHITFIEL THREE CONVERSION VANS (1 NITA A LIFT) 6C2399 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WHITFIELD
MANAGER! STEVE KISH
CONG DIST. 9
CAPITAL 1994
$ as
FUND SOURCE: RURAL TRANSIT
FED SHARE$
69
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
9
0TH SHARE$
9
WHITFIEL ONE CONVERSION VAN AND ONE STANDARD VAN
6C2399 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WHITFIELD MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1995
$
49
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
39
GA, SHARE$
s
0TH SHARE$
s
WHITFil!:L I-75 , SR 3 CONN FM CR 91. I!: TO DUG GAP RD E/I-75 610690 INTl!:RCHANGE / RECST. OR REHM.
PROJECT MILEAGE: ,39 - EXIST. LANES: 2 /PROPOSED LANES: 6
MANAGER: IU\Y METTS (C)
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1995 $ 100 CONST 1995 $ 2529
FED SHARE $ 2022 GA. SHARE $ 506 0TH SHARE $
WHITFIEL I-75@ SR 3/US 41/ROCRY FACE EXIT 610760 INTERCHANGE/ RECST. OR REHM.
PROJECT MILEAGE: .53 - EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: RON BRAZIEL (H)
CONG DIST. 9
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 RON CONST
$ 250 AFTER 96 AFTER 96
COUNTY P. I.NO,
DSCRIPTION PROJECT DATA
r.r.i,p_r.JI\ r,r.rl\RTME"'T OF TRAtlSrORTI\TION STI\TE TRANSPORTI\TION IMPROVEMENTS PROGRJ\H
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
WRITFl!L I-75 RAMP AT SR 201 ,10900 1tAMP / RECST, OR REHAB.
PROJECT MILEAGE: ,00 - EXIST. LANES: 6 /PROPOSED LANES: 6 MANAGER: RAY METTS
CONG DIST. 9
FUND SOURCE: I-STATE HAINT, FEDERAL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 334
FISCAL
COST
YEAR
. ESTS
P-E---1-9-9-6-----$--.----4
ROW
AFTER 96
CONST
AFTER 96
WRITFIEL SR 3/US 41: FM SR 3 CONN NE TO WALNUT AVE IN DALTON 620630 RECONSTRUCTION' WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE: 5,19 MANAGER! RON BRAZIEL (H)
CONG D1ST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
WHITFIEL SR 3/US 41 FH N OF STONECREST ORN TO CR 306/TUNNEL HILL 620960 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: 2.90 . MANAGER! RON BRA!IEL
WHITFIEL SR 71 FM CR 228/WILLIAHS ROTON or CR 213/677
620970 RECONSTRUCTION ,wIOENING FROM 2 LANES TO 5 LANES, PROJECT MILEAGE: 4,30 MANAGER: J, GRAYBEAL(M)
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 6246
FED SHARE$ 4997
GA. SHARE$ 1249 0TH SHARE$
PE 1992 ROW 1993 CONST
UNDERWAY UNDERWAY AFTER 96
lfflITFIEL SR 71 FM N OF CR 213/677 NORTHERLY TO CR 19/COHUTTA 620975 RECONSTRUCTION' WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE I 4,10 MANAGER: J. GRAYBEAL
CONG DIST. 9
FUND.SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1993 CONST
UNDERWAY UNDERWAY AFTER 96
WHITFIEL SR 71 FH NORTH BYPASS N TO DAWNVILLE RD '621290 RECONSTRUCTION, WIDENING FROM 5 LANES TO 6 LANES.
PROJECT MILEAGE: 1.32 MANAGER: H GANNAWAY
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 4479 AFTER 96
WltITFIEL SR 52 FH SR 52 BUS TO CR 112 /DALTON BYP [' BR @ HILL CK) 621300 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : .65 MANAGER: BILL_HCVEY
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 1439
FED SHARE $ 1151 GA. SHARE $ 288 0TH SHARE $
" ...
fl
~
' ....
-
llll!!!!l
I
~ .,,
_f@!I
-
~
~
~
~
~
me,
~~J.~ K@.'!l:~
.to
'Q_
~;ij
,~~i~~
f:,----'-:i:)
.
''-"
GEORGIA DEPARTHENT-OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 335
COUNTY
DESCRIPTION
FISCAL
COST
P, I ,NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
W--H-I-T-F-IE-L---SR---52---FM---1---7-5--TO---S-R--3-/U--S--4-1------------------------------------------------------------------------------P-E--1-9-9-6-----$------85
621800 RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED,
CONG DIST. 9
ROW
AFTER 96
PROJECT MILEAGE: 1.90
-
CONST
AFTER 96
MANAGER! BILL MCVEY (M)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADHIN FUNDS
WHITFIEL CR 664/AIRPORT RD FM TIBBS BR RD TO HURRAY CO LINE 631065 RECONSTRUCTION, "IDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE I 4.60 MANAGER! BILL MCVEY (H)
CONG DIST, 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW LOCL
CONST
UNDER"AY AFTER 96
"RITFIEL SR 201 EB HP 13.6-14.9: NB HP 14.6-15.51 NB 17-I9;RTL@ SR 2 631250 ADDITION OF A PASSING LANE.
PROJECT MILEAGE: 3.40 MANAGER: BILL MCVEY (H)
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1992 ROW 1996
CONST
UNDER"AY
$
276
AFTER 96
WHITFIEL SR-3; 7 CULVERT EXTENSIONS FM HP 0.19 TO HP 5.36 631390 BRIDGES/ TRAFFIC
PROJECT MILEAGE: 5.19 MANAGER: BILL MCVEY
WHITFIEL CR 664/AIIU'ORT RD FM TIBBS BRIDGE RD NW TO SR 52 650390 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: ,90 MANAGER: BILL MCVEY
WHITFIEL PEDESTRIAN/BIKE PATHS ANO LANDSCAPING IN DALTON 670990 BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST, 9 FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST, 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHNAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS
PE 1993 UNDERWAY
ROW 1995 $
32
CONST '1996 $ 470
FED SHARE$ 423
GA. SHARE$
47
OTR SHARE$
PE 1992 UNDERWAY
ROW LOCL CONST 1995 $ 806
FED SHARE$ 645 GA. SHARE$ 161 0TH SHARE$
PE 1996 $
59
ROW 1996 $ 198
CONST 1996 $ 480
FED SHARE$ 384
GA. SHARE$
50
0TH SHARE$ 146
~Enn~tl\ nErl\RTHENT OF TPI\NsrnRTI\TTON STI\TE TRMlSrORTI\TION IMPROVEHEIITS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 336
COUNTY
DESCRIPTION
FISCAL
COST
P I. NO.
PRO.Te:CT DATA
COMMENTS
YEAR
ESTS
WILCOX COUNTY OPERATED PUBLIC TRANSIT SER-V--IC-E-----------------------------------------------------------------------------------
4B1278 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 8
FUNDS RECIPIENT: NILCOX MANAGER: STEVE KISH
OPERATING 1994 $
38
FUND SOURCE: RURAL TRANSIT
FED SRA.RE$
23
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
15
WILCOX 4B1279
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: NILCOX MANAGER! STEVE KISH
CONG DIST. 8.
OPERATING 1995 $
40
FUND SOURCE: RURAL TRANSIT
FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SRA.RE$
0TH SHARE$
16
WILCOX 4Bl280
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: "ILCOX MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1996
$
42
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
17
WILCOX 4C2278
TWO MOBILE RADIOS AND ONE MOBILE RADIO BASE STATION
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILCOX MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1994
$
' 7
FED SHARE$
6
GA. SHARE $
0TH SHARE$
1
WILCOX 4C2279
ONE CONVERSION VAN "ITH LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: NILCOX MANAGER: STEVE KISH
CONG DIST. 8
CAPITAL 1995
$
33
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$ GA. SHARE$ 0TH SHARE$
26 3
WILCOX 421962
SR 11/US 129@ FOLSOM CRK:CEDAR CRR;CEDAR CRK OLFW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE: 1.00 MANAGER: J, LINDSEY
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDER"AY
ROW 1994 $
3
CONST 1995 $ 1274
FED SHARE $ 1019
GA. SHARE $ 255
0TH SHARE $
WILCOX 422080
SR 30 EB FH HP 14.5-16.0;WB HP 12.3-13.5
ADDITION OF A PASSING LANE. PROJECT MILEAGE: 2,70 MANAGER: J. LINDSEY '
CONG DIST, 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW 1993 UNDERWAY
CONST 1995
$
844
FED SHARE $ n5
GA. SHARE $ 169
0TH SHARE $
..
" r
r,.
,;
' ""'
-
ll!!!W!I
. .. ~ .~
~
~
~ = m
,~ ,::.z,:;-.lll
~
!@:.~
== = ~,~~
"' ~
~~;~
\?:;: ,;;l
!~"'._.:,,:.;nf
/:.>
.
,;;;;.
GEORGIA DEPARTHENT-or TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 337
COUNTY
DESCRIPTION
FISCAL .COST
P,I.NO,
PROJECT DATA
COHHENTS
YEAR
BSTS
W--IL-C-O-X----S-R---30-/-U-S---2-8-0-: ---O-V-E-R--H-I-L-L--C-R-E-E-~--W-E-S-T--o-r--R-O-C-H-E-L-L-E----------------------------------------------------------P-B--1-9-9-5-----$------10
422310 REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST, 8
ROW
AFTER 96
PROJECT MILEAGE: ,00
CONST
AFTER 96
HANAGERI
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADHIN FUNDS
WILCOX 431310
SR 11/US 129: OVER CEDAR CREE~ OVERFLOW REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: ,00 MANAGER!
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
PB 1995 ROW CONST
$
10
AFTER 96
AFTER 96
WILCOX SR 11 FM c,G 8 BUSH ST, FITZGERALD.TO c,o 8 ABBE'LE/BEN RILL
PB NONE $
0
43136X SHOULDER WOM / MAINTENANCE
CONG DIST. 8
ROW NONE $
0
PROJECT MILEAGE: 20.06 - EXIST, LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER! UNKNOWN
FUND SOURCE: SURFACE TRANSPORT,
FED SHARE$
FEDERAL HIGHWAY ADHIN FUNDS
GA, SHARE$
0TH SHARE$
'
COUNTY P, I ,NO,
DESCRIPTION PROJECT DATA
r,F.ORr,IA OEPARTMENT OF TRJ\NSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
WIUES 281193
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WILUS MANAGER: STEVE KISH
CONG DIST, 10, 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
WILKES 281194
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WILUS MANAGER: STEVE KISH
(_
CONG DIST. 10, 11 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
WILKES 281195
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WILUS .
MANAGER: STEVE KISH
CONG DIST. 10, 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
WILKES 2C2193
ONE STANDARD VAN
TRANSIT FACILITIES/ CAPITAL_ FUNDS RECIPIENT: WILMS MANAGER: STEVE KISH
CONG DIST, 10, 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
WILKES 2C2194
ONE STANDARD VAN
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILUS MANAGER: STEVE KISH
CONG DIST, 10, 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
WILKES 2C2195
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILKES MANAGER: STEVE KISH
CONG DIST. 10 ., 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
WILKES 270960
REVITALIZATION/LANDSCAPE HISTORIC DIST IN WASHINGTON LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 11, 10
FUND SOURCE: TRANS. ENHANCE. 'FEDERAL HIGHWAY ADHIN FUNDS
16-Sep-1993 Page 338
FISCAL YEAR
COST .. ESTS
. ---------
OPERATING 1994 $
so
FED SHARE$
30
GA, SHARE$
0TH SHARE$
21
OPERATING 1995 $
53
FED SHARE$
31
GA, SHARE$
OTR SHARE$
22
OPERATING 1996 $
55
FED SHARE$
32
GA. SHARE$
0TH SHARE$
23
CAPITAL 1994
$
20
FED SHARE$
1fi
GA. SHARE$
2
0TH SHARE$
2
CAPITAL 1995
$
20
FED SHARE$
u
GA. SHARE$
2
0TH SHARE$
2
CAPITAL 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
PE LOCL
ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$ 0TH SHARE$
32 26
3 3
0 581 465
65 181
,c,.
~
F,
..
;e::,.
- - . - - . = F) .. ~'~ ._
~
ws::rre
~
~
~
-~- t,;:)!LJ ~
l~:fJ::;;
,r,~;;-~
t.-,-,";.,.'
.~-~ ....
'.,ii_;;,'
GEORGIA DEPARTMENT or TMNSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAH PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page JJ9
COUNTY
DESCRIPTION
FISCAL
.COST
P,I,NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
W-I-L-~I-N-S-O--C-O-U-N-T-Y--O-P-E-R-A-T-E-D--P-U--B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E----------------------------------------------------------------------------------
281198
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WIL~INSON MANAGER: STEVE RISR
CONG DIST. 11
OPERATING 1994 $
22
FUND SOURCE: 0 RURAL TRANSIT
FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA, SHARE$
OTR SHARE$
9
WIL~INSO COUNTY OPERATED 1PUBLIC TRANSIT SERVICE 2Bll99 TRANSIT FACILITIES/ OPERATIONS
FUNDS MCIPIENT: WILKINSON MANAGER! STEVE RISH
CONG DIST, 11
OPERATING 1995 $
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
19
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
OTR SHARE$
14
WILRINSO COUNTY OPERATED PUBLIC TRANSIT SERVICE 281200 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WILKINSON MANAGER: STEVE RISH
CONG DIST. 11
OPERATING 1996 $
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
19
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
WIL~INSO ONE STANOA.JU) VAN AND ONE MOBILE RADIO
2C2199 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WILKINSON
MANAGER: STEVE RISH
.
'
WILRINSO ONE CONVERSION VAN WITH LIFT ANO ONE MOBILE RADIO 2C2199 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WILKINSON MANAGER: STEVE RISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1994
$.
21
FED SRA.RI!:$
17
GA. SHARE$
2
OTR SHARE$
2
CONG DIST. 11
CAPITAL 1995
$
33
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SR.ARE$ GA. SHARE$ OTR SHARI!:$
26 3
WILRINSO us 441@ BIG SANDY CREER Sor IRWINTON
221762 REPLACEMENT OF TRE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS
CONG DIST; 11
GRIP. PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221760 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1994 CONST
UNDERWAY
$
6
AFTER 96
WILRINSO US 441@ SOUTHERN RR' COMMISSIONERS CRR/HCtNTYRE 221764 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .00 MANAGER: H. REYNOLDS
CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221760 IS AN ASSOCIATED PROJECT.
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
~EORGIA PErAnTMENT OF TRAN~ronTATION STATE TRAtlSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 340
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
------- P,1.NO,
PROJECT DATA
COMMENTS
YEM
ESTS.
W--!-L-K-!N-S-O---SR---2-9-/U-S---4-4-1-@---B-LA-C-K---C-R-E-EK--------------------------------------------------------------------------------P-E--1-9-9-2--- UNDERWAY
221935 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES,
CONG DIST. 11
ROW NONE $
0
PROJECT MILEAGE: ,00
HANA~ERr H. REYNOLDS
GRIP PROJECT
FUND SOURCE: BRIDGE PROGRAM
CONST 1995 $ 161 FED SH.ARE$ 129
FEDERAL HIGHWAY ADHIN FUNDS
GA, SH.ARE$
32
221930 IS .AN ASSOCIATED PROJECT.
0TH SKARE$
f .
.'"'-l' ,
'"' '~ ~
, -
(:!la----.
il!IWII
.. . 1'!1!11!!!!!1!! - ~..:.:--..:~<; ~ ~ "
~
~
~g
Mt!!
i:tt.:s~
!"W:&i~:
.
~:):~:rJi
;
r.4<:.:iu
?~~ti~l
{:;;--~,-~")
:':
- .'-.,;_ '-- -~~
GEORGIA DEP~RTHENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993
Page 341
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
Dl':SCIHPTION .
FISCAL
"COST
P,t.NO.
PROJECT DATA
COMMENTS
YEAR
EST9
W--O-R-TH-----C-R---1-60--N-E--O--F--D-O-E-R-U-N-@---O-C-H-L-O-C-~-O-N-E-E--R-I-V-E-R------------------------------------------------------------------P-E--1-9-9-4-----$------1'
431120 REPLACEMENT OF THE EXISTING BRIDGl':S(S), NO ADDED LANES,
CONG DIST, 8
ROW LOCL
PROJECT MILl':AGE: .50
CONST
AFTER 96
MANAGER: J, LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
WORTR 470890
CR 164/ELH STREET OVER WARRIOR CREE~ IN POULAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : 1.00 MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 251
FED SHARE$ 201
GA. SHARE$
50
0TH SHARE$
(
,f! t