Statewide Transportation Improvement Program, fiscal years 1994,1995,1996 [1994]

,)GA

1100,PlP

.4

$\
-:CA

l'l'\4/llTATEWIDE

--r- -,. TRANSPORTATION

'7l -IMPROVEMENT PROGRAM

I
Georgia Department of l'ransportation

Fiscal Years
1994 1995 1996

i

i
i

I

!

-~ ~1 jj.

.

?, .

'

i

';
INTRODUCTION

The Statewide Transportation Improvement Program (STIP) is developed to comply with the provisions of the Intermodal Surface Transportation Efficiency Act of 1991 (!STEA). The STIP contains Federal Aid projects programmed for Fiscal Years 1994, 1995 and 1996. The projects have been identified through the planning process and represent transportation needs statewide.

The STIP includes Highway and Bridge, Bicycle,. Pedestrian, Transportation Enhancement, and Public Transportation (transit) projects. Phases of projects, also referred to as projectrelated activities, such as PE (Preliminary Engineering), ROW (Right of Way) and CONST (Construction) are given for highways, and capital and operating for transit. The projects are organized by County and by mode of transportation. The STIP format has been standardized with the same information for each project.

The STIP is a federal requirement for receipt of Federal Highway

Administration and Federal Transit Administration funds. The

STIP must be fiscally balanced. Projects and phases of projects

listed must only include those for which there is funding

available or for which there is a reasonable expectation of

obtaining funds. Federal funds for Fiscal Years 1994, 1995 and

I

1996 are program estimates and will not be final until after the

federal budget is approved by October 1 of each year.

The STIP is a cooperative effort between local governments, the Metropolitan Planning Organizations, lead agencies for urban area planning, and the Georgia Department of Transportation. The Metropolitan Planning Organizations, through the urban area planning process, have identified local transportation needs in urban area Transportation Improvement Programs. The urban area projects are included in the STIP along with rural area projects identified by the Department 1n consultation with local governments.

The three year Statewide Transportation Improvement Program

includes nearly 1,600 projects totaling $2.6 billion in federal,

f;

state and local funds. Projects funded with !STEA Title I

Ii

(highway) funds make up 69% of the project-related activities and. 83% of the funding; projects funded with !STEA Title III

(transit) funds represent 31% of the projects and 17% of the

expenditures.

Reconstruction and rehabilitation of existing highways and bridges account for 38% of the STIP funding. The next highest category of programmed STIP spending for highways is new construction - approximately 14% of the total. Maintenance represents 13.7% of the program.

,
D

Public Transportation projects make up 31% of projects in the STIP - capital purchases and operating ass1stance are the major activities. Public transportation program funds are used for purchase of vehicles and other transit equipment.

The Statewide Transportation Improvement Program places emphasis

on maintaining and improving the existing highways, bridges, and

public transportation equipment. The public transportation

program expenditures focuses on replacement of vehicles and

.L

other operating equipment as a means of improving public transit

operations, safety, and meeting the requirements of the

Americans with Disabilities Act. Figures 1 and 2 depict the

number of projects and amount of funding for the three year

period. Fiscal Years 1994, 1995, and 1996.

The Georgia Department of Transportation is pleased to make -this

document available. We welcome any comments on the STIP; please send your comments to:

H!

ii iii

Georgia Department of Transportation

&

Office of Planning

i

No. 2 Capitol Square

M

Atlanta, Georgia 30334

!.

i

Att: Marta V. Rosen

i

(404) 656-5725

I I

rt Ct

GLOSSARY OF ACRONYMS AND ABBREVIATIONS

FOND SOURCE:

\t

CATFX;ORIES OF FEDERAL HIGHWAY ACT (FHWA) FUNDING

CONG MIT./AIR QUAL - Congestion Mitigation/, Air Quality FED. LANDS - Federal Lands HWY. SAFETY - Highway Safety I-STATE MAINT. - Interstate Maintenance I-STATE CONST. - Interstate Construction NAT'L HIGHWAY - National Highway System OLD URBAN SYSTEM - funds allocated to Georgia before ISTEA SURFACE TRANSPORT. - Surface Transportation Program TRANS. ENHANCE. - Transportation Enhancement Assistance

CATFX;ORIES OF FEDERAL TRANSIT ACT (FTA) FUNDING

:r:

URBAN TRANSIT DISC. - Discretionary assistance

!

awarded on a competitive basis by the FTA; ADA or

CAA indicates Americans with Disabilities Act

"

project or Clean Air Act project .

URBAN TRANSIT - Urban Area assistance - can be

capital or operating funds; ADA or CAA indicates

l

Americans with Disabilities Act project or Clean

Air Act project.

ELDERLY & DISABLED - Assistance for Elderly and

Handicapped capital projects.

RURAL TRANSIT - Rural Area assistance - can be

capital or operating funds.

OTHER ACRONYMS/ ABBREVIATIONS

BR - Bridge

CONG DIST. - Congressional District

CONST - Construction

CS - City Street

CR - County Road

CWP

Construction Work Program. The

Construction Work Program includes projects in

two phases Phase I (first three years of the

Program) and Phase II (next three years of the

Program). The STIP is derived from Phase I

projects.

FED SHARE - Federal Share of the cost of the

project

FM - Indicates from

GA. SHARE - Georgia Share of the cost of the

project

HOV LANES

High Occupancy Vehicle lanes;

I

1

designated lanes used exclusively for multiple-occupancy vehicles.

INT - Intersection, usually seen as smith Road

Int Jones Street.

LGPA - Local Government Project Agreement. These

agreements outline highway and bridge project

responsibilities between the GDOT and the local

government. The status line will indicate if an

agreement has been requested, signed or refused

(a signed or refused agreement would have the

date of the transaction noted on the project

description). Most LGPA address sharing

responsibilities for right of way, utilities or

detours.

LOC SHARE - Local Share of the cost of the

project

N, S, E, W - North, South, East, West. May

also be used in combinations of NE, SW etc.

NB, SB, EB, WB - North Bound, South Bound, East

Bound,. West Bound indicating direction of

movement. Sometimes will be shown as NBL, SBL,

EBL or WBL to indicate North Bound Lane, South

Bound Lane, East Bound Lane or West Bound Lane.

B OR BU OR BUS - Business Route

...

BYP - Bypass or Circumferential Route CONN - Connector

EXT - Extension

FRNTG - Frontage

NOISE BARR. - Noise Barrier

PE - Preliminary Engineering indicates an early

phase of project development that may include

surveys, design, environment.al and other work

done in project development.

P.I. NO. - Program Item Number is unique to each

project.

PKWY -Parkway

RECST. OR REHAB.

Reconstruction or

Rehabilitation

RTL OR LTL - Right Turn Lane or Left Turn Lane

R/W or ROW - Right of Way

SR - State Route

T&S PROJECT - Traffic and Safety Project

TIP

Transportation Improvement Program

developed by the Metropolitan Planning

Organizations

UTL OR UTIL - Utilities

EIE i

I

n

-~

l~ liill1lillilll

- ' ~ -

~

~

_ 1 ~ W

~ -

~ -.,:.. .t--i

~ . 1.~t"i--1.~

\lf},o/.1!ffl .

-
1!1>"-W

-==...i. fll .

-~-= lllil

-
l"-'''-0

......_
,.;,o,cc.c-,,

f.+.,;}~'
'', '

i'~c'"...

i'' ,,.,..,-_

.

:,- ._;,

STATEWIDE FUNDS DISTRIBUTION

FEDERAL_AID PROJECTS(FY-1994-1996)

COUNT OF PROJECTS

OTHER
24

PUBLIC TRANSIT
491

NEW CONSTRUCT . 64
ENHANCEMENT 71

RECST/REHAB
410
SAFETY
207
MAINTENANCE BRIDGE REPLACEMENT 71
241

TOTAL= 1600

FIGURE 1

"
L
,1.'

~

., ... ~

~

~
'

~

~

~

f,.'f.:'!?,:?'1

Fl!,...!!!.~

., f'.f.i....~

~
;; \

~

~

~~~1

r~~--~:-:-1

. '-~.,:: ,,...,...

--~;_

~

,;



STATEWIDE FUNDS DISTRIBUTION

FEDERAL_AID PROJECTS(FY 1994-1996) -

PROJECT COST(MILLIONS $)

PUBLIC TRANSIT

OTHER

$453.1

r

$65.8

NEW CONSTRUCT

$365.2

RECST/REHAB $979.7

ENHANCEMENT $57.7
SAFETY $181.4

. MAINTENANCE BRIDGE REPLACEMENT $355.4
$149.6

TOTAL = 2.6 BILLION

FIGURE2

II

fflM

- ..... Ii!!@!! ~

-,:

,

'"

~

~ -~

~Jffl

fa!~!!

~~f!,
'

~

,~~ei

~~~ti

~

~

~'.'f:"'~
< ';-,
;.1}

i~ ,..,-~ . . .
. , "

i,.,.' ...

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 1

COUNTY

DESCRIPTION

P.I.NO.

PROJECT DATA

-------------------.

--

ALL

THREE CONVERSION VANS (2 WITH LIFTS); AND ONE STANDARD VAN

FISCAL

COST

---C-O-M--M-E-N-T-S ---------------------------Y-E-A-R --------E-S-T-S --

7C2512 TRANSIT FACILITIES/ CAPITAL

CONG DIST. 5

FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1994

$

109

FED SHARE$

87

GA. SHARE$

22

0TH SHARE$

ALL 7C2513

TWO CONVERSION VANS (1 WITH A LIFT); AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH

CONG DIST. 5

CAPITAL 1995

$

80

FUND SOURCE: RURAL TRANSIT

FED SHARE$

64

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

16

0TH SHARE$

ALL 7C2514

TWO CONVERSION VANS (1 WITH A LIFT); AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH

CONG DIST. 5

CAPITAL 1996

$

81

FUND SOURCE: RURAL TRANSIT

FED SHARE$

65

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

16

0TH SHARE$

ALL 8Vl010

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL 1994

$ 287

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

230

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

28

0TH SHARE$

29

ALL 8V1011

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA.
MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL 1995

$ 297

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

238

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

29

0TH SHARE$

30

ALL 8Vl012

ELDERLY AND DISABLED VEHICLES. AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL ,1996

$ 308

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

246

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

31

0TH SHARE$

31

ALL 8Vl013

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL 1994

$ 181

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

145

FEDERAL TRANSIT ADMIN.FUNDS

GA. SHARE$

18

0TH SHARE$

18

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATIO'. IMPROVEMENTS PROGRAM

Page 2

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

-FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

8Vl014 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 0

FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA

CAPITAL 1995

$ 187

MANAGER: STEVE.KISH.

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 150

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

18

0TH SHARE$

19

ALL 8Vl015

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

TRANSIT PROJECTS/ CAPITAL

FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA

MANAGER: STEVE KISH

.

CONG DIST. 0

CAPITAL 1996

$ 194

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

155

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

20

0TH SHARE$

19

ALL 8Vl016

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL, COUNTIES - SOUTH GA. MANAGER: STEVE KISH

CONG D.IST. 0

CAPITAL 1994

$ 205

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 164

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

21

0TH SHARE$

21

ALL 8Vl017

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL 1995

$ 212

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 170

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

21

0TH SHARE$

21

ALL 8Vl018

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL 1996

$ 220

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 176

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

22

0TH SHARE$

22

ALL 044094

LUMP SUM MAINTENANCE FUNDED "0_4 4" FOR FY 19 9 4

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
2921 2629
292

ALL 044095

LUMP SUM MAINTENANCE FUNDED "044" FOR FY 1995

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL; STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
23862 21476
2386

- . V

...

ll_l.

..,

-

-

~ ~
,. a:- ..

~

~

~

me

~

~


. 6'!'.~.:.tli'=J

IL!~~

,.,.,~~

LK'.I:'/

1;.c "}i1

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

ALL 044096

LUMP SUM MAINTENANCE FUNDED "044" FOR FY 1996

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

. ~~~~ w;------~: ' ,

r''

16-Sep-1993 Page 3

FISCAL YEAR

COST ESTS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$ 0TH SHARE$

0
0
27778 25000
2778

ALL 04MB94

LUMP SUM BRIDGE PAINTING "04M" FOR FY 94
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $
ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
5064 4558
506

ALL 04MB95

LUMP SUM BRIDGE PAINTING "04M" FOR FY 95
BRIDGES/ MAINTENANCE .PROJECT MILEAGE : .00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0 4444 4000
444

ALL 04MB96

LUMP suM BRIDGE PAINTING "04M" FOR FY 96
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$ 0TH SHARE$

0 0 4444
4000
444

ALL 315094

LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
27293 21834
5459

ALL 315095

LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
36500 29200
7300

ALL 315096

LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
36500 29200
7300

r

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 4

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

A--LL--------LU-M--P--SU-M---IN--ST-A--LL LO-G--O -- SIGNS ON NATIONAL -- HWY SYSTEM - 1994

--- -----------------------------4---------------------------

PE NONE $

0

315L94 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONG DIST. 99

ROW NONE $

0

CONST 1994 $ 100

MANAGER:

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

80

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE.$

20

0TH SHARE$

ALL 315L95

LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYS - 1995 sIGNING / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. -99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1995 $ 100

FED SHARE$

80

GA. SHARE$

20

0TH SHARE$

ALL 315L96

LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYSTEM - 1996 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

. ROW NONE $

0

CONST 1996 $ 100

FED SHARE$

80

GA. SHARE$

20

0TH SHARE$

ALL 315094

LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1994 LIGHTING/ MAINTENANCE PROJECT. MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1000 800 200

ALL 315095

LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1995
LIGHTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1000 800 200

ALL 315096

LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1996
LIGHTING / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1000 800 200

ALL 33A094

LUMP SUM SAFETY "OPTIONAL" FOR FY94 UNKNOWN/ TRAFFIC PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER

CONG DIST. 99
FUND-SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1060 954 106

~
'.,:

.

. ,....._ ..~

-

II!!!!!!

- - l!l~!!!l
"

~

~

~

~

~

f~


~


~

~

~

~

~~~
.t

I~;...,:~~:'.~
41',a

!-1.,., ...... ;....,:;1

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 5

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM SAFETY "OPTIONAL" FOR FY95

PE NONE $

0

33A095 UNKNOWN/ TRAFFIC

CONG DIST, 99

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1995

$

900

MANAGER: W HESTER

FUND SOURCE: HWY. SAFETY

FED SHARE$

810

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE.$

90

0TH SHARE$

ALL 33A096

LUMP SUM SAFETY "OPTIONAL" FOR FY96 UNKNOWN/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1996

$

900

FED SHARE$

810

GA. SHARE$

90

0TH SHARE$

ALL 33C094

LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
2500 2000
500

ALL 33C095

LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F

RIDING SURFACE .REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
2500 2000
500

ALL 33C096

LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

.

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
7500 6000 1500

ALL 33CB94

LUMP SUM BRIDGE PAINTING "33C" FOR FY 94
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $
CONST 1994 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1444 1155
289

ALL 33CB95

LUMP SUM BRIDGE PAINTING "33C" FOR FY 95
BRIDGES/ MAINTENANCE PROJECT MILEAGE : ,00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA; SHARE$ 0TH SHARE$

6
0
3750 3000
750

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 6

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

.A-L-L-------L-U-M-P--S-U-M--B-R-I-D-G-E--P-A-I-N-T-I-N-G--"-3-3-C-"--F-O-R--F-Y---96------------------------------------------------------------------P-E--N-O-N-E-----$------.o

33CB96 BRIDGES/ MAINTENANCE

CONG DIST. 99.

ROW NONE $

0

PROJECT MILEAGE : .00

CONST 1996 $ 3750

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 3000

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 750

0TH SHARE$

ALL 330094

LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 94

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 11329
9063 2266

ALL 330095

LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 95

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK

0
FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1995 . $

FED SHARE$

GA. SHARE$

0TH -SHARE$

0 0 15000 12000 3000

ALL 330096

LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 96

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0. 0 11400 9120 2280

ALL 33DB94

LUMP SUM BRIDGE PAINTING "33D" FOR FY 94 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED. SHARE $

GA. SHARE$

0TH SHARE$

0 O 5000
4000 1000

ALL 33DB95

LUMP SUM BRIDGE PAINTING "33D" FOR FY 95 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE $

CONST1995 $

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 5000 4000 1000

ALL 33DB96

LUMP SUM BRIDGE PAINTING FOR "330" FOR FY 96 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE .$ ROW NONE $ CONST.1996 $
FED SHARE$
GJC SHARE $
0TH SHARE$

0 0 5000 4000
1000

...,



\a

....
f

-

l!IM

- . ll!IM '

MB

~

~

. ~ ~ ~ ~ ~tt~ ~~
GEORGIA DEPARTMENT OF TRANSPORTATION

~i~~

~c.:,Jii!.

..)>;>.~

. v,:--,;~

...;- ,:-~~--~

....... -.--~~

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 7

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM INSTALLATION OF LOGO SIGNS "1994"

PE NONE $

0

33DL94 SIGNING/ TRAFFIC

CONG DIST. 99

ROW NONE

$

0

PROJECT MILEAGE : .00 - EXIST. ~ES: 0 /PROPOSED LANES: 0

CONST 1994 $

50

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

40

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

10

0TH SHARE$

ALL 33DL95

LUMP SUM INSTALLATION OF LOGO SIGNS "1995" SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

PE NONE $

0

CONG DIST. 99

ROW NONE $

0

CONST 1995 $

50

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

40

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

10

0TH SHARE$

ALL 33DL96

LUMP SUM INSTALLATION OF LOGO SIGNS "1996"
SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:

PE NONE $

0

CONG DIST. 99

ROW NONE $

0

CONST 1996 $

50

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

40

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

10

0TH SHARE$

ALL 33MS94

LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 94
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE $

0TH SHARE$

0 0 2177 1959 218

ALL 33MS95

LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 95
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0. -
o
3400 3060
340

ALL 33MS96

LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 96
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER

CONG DIST. 99
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE, $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 3026 2723 303

ALL 33NS94

LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 94
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$ 0TH SHARE$

0 0 1300
1170 130

GEORGIA DEPARTME"'T OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

Page 8

COUNTY

DESCRIPTION

P. I.NO.

PROJECT DATA

----- - - - ALL

LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 95

33NS95 RR XING / TRAFFIC

FISCAL

COST

COMMENTS

YEAR

ESTS

-----------------------------------------------------------------

PE NONE $

0

CONG DIST. 99 '

ROW NONE $

0

PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0

CONST 1995

$

720

MANAGER: W HESTER

FUND .SOURCE: HWY. SAFETY

FED SHARE$

648

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

72

0TH SHARE$

ALL 33NS96

LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 96 RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 2488 2239 249

ALL 3AA094

LUMP SUM MAINT. FOR POP BET 5000-200,000 FOR FY 94

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L .- SEABROOK

.

FUND SOURGE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 12300 9840 2460

ALL 3AA095

LUMP SUM MAINT. FOR AREA POP BT SK - 200K FOR FY 1995

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILE}\.GE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

.

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 12500 10000
2500

ALL 3AA096

LUMP SUM MAINT. FOR AREA POP BET 5,000-200,000 FOR FY 96

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST, 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT .

. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1996 $

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 12500 10000
2500

ALL 3AAB94

LUMP SUM BRIDGE PAINTING "3AA" FOR FY 94

BRIDGES/ MAINTENANCE

J

PROJECT MILEAGE : .00

MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

617

FED SHARE$

494

GA. SHARE$

123

0TH SHARE$

ALL 3AAB95

LUMP SUM BRIDGE PAINTING "3AA" FOR FY 95
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE $
0TH SHARE$

0 0 6250 5000 1250

,..

,.

, ....

fflM

-

-"'

...

~


11M

l!llM

Mffl

~

I!!!!!'!!!

~
"

..11'!::tt:!liJ

~

~~;.~~

~~~

!,. .,...U

.,. . ~

I . . . . . _
--

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 9

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM BRIDGE PAINTING "3AA" FOR FY 96

PE NONE $

0

3AAB96 BRIDGES/ MAINTENANCE

CONG DIST. 99

ROW NONE $

0

PROJECT MILEAGE : .00

CONST 1996 $ 6250

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT ..

FED SHARE$ 5000

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 1250

0TH SHARE$

ALL 770391

LUMP SUM -- 817 SIGNALS FOR METRO ATLANTA REMAINING FUNDING SIGNALS'/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

ATLANTA TIP t R 98
CONG DIST. 5 & 4
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

100

CONST 1996 $ 46985

FED SHARE $ 37588

GA. SHARE $ 9397

0TH SHARE $

ALL 770392

PE FOR METRO ATLANTA SIGNAL SYSTEM PROJECTS PRELIMINARY ENGINEERING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP t R 98
CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW NONE CONST NONE

UNDERWAY

$

0

$

0

ALL 811010

STUDY OF AUTOMATIC MOTOR-CARRIER CLEARANCE (ADVANTAGE I-75) SPECIAL STUDIES/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: I-STATE MA.INT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW NONE CONST NONE

$ 2200

$

0

$

0

ALL 811020

RURAL IVHS I-85, I-16, I-95, I-75 AND I-20 MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ALL 870000

FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1994 SPECIAL STUDIES/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 99 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 99 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW NONE

UNDERWAY

$ .

0

CONST 1994 $ 2310

FED SHARE $ 2310

GA. SHARE $

0TH SHARE $

PE 1994 ROW NONE CONST NONE

$ 3000

$

0

$

0

ALL 870010

FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1995 SPECIAL STUDIES/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 99
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW NONE CONST NONE

$ 3000

$

0

$

0

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 10

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1996

PE 1996 $ 3000

870020 SPECIAL STUDIES/ PLANNING

CONG DIST. 99

. ROW.NONE. $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE $

0

MANAGER:

FUND SOURCE: UNKNOWN

FEDERAL HIGHWAY ADMIN FUNDS

ALL 870030
\.

RAILROAD CROSSING ADVANCE WARNING SIGNS -- STATEWIDE
RR XING / TRAFFIC PROJECT MILEAGE : .00 -.EXIST. LANES:: 0 /PROPOSED LANES: 0 MANAGER: W HESTER

CONG DIST, 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

ALL 870040

11 COVERED BRIDGES IN VARIOUS LOCATIONS STATEWIDE BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER:

, CON~ DIST, 10 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

ALL 870050

GEORGIA DEPT. OF TRANS. HIGHWAY SIGNS MANAGEMENT SYSTEM SPECIAL STUDIES/ OTHER PROJECT MILEAGE :;.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

200

FED SHARE$ 180

GA. SHARE$

20

0TH SHARE$

PE 1994 $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

50
0
1000 800200

PE 1994

$

225

ROW NONE $

0

CONST NONE

$

0

I

,,....

. ,,

.

ia'

ffl!l1!IJ!!I

- -., ,. ~. ~

~

~

~

~

~!'.ll

a?X!~~~

~~

t............,,

/';-;-:"=:~~

~\'.~~

~

~
'

..r.:.:-:-;,:;:

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 11

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

----------------------------------------------------------------------------------------------------------------------------------

ATKINSON SR 31@ UNNAMED CRK

PE 1990 UNDERWAY

421440 REPLACEMENT OF THE EXISTING BRIDGES(S) .- NO ADDED LANES.

CONG DIST. 8

ROW 1991

UNDERWAY

PROJECT MILEAGE : .17

GRIP PROJECT

CONST

AFTER 96

MANAGER: UNKNOWN

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

(.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 12

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------------------------------------------------------------------------------------------------. ----------------------

BACON SR-32/ALMA@ HURRICANE CREEK

PE 1983 UNDERWAY

520910 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.

CONG DIST. 1

ROW NONE

$

0

PROJECT MILEAGE : .65

CONST 1995

$ 1661

MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 1329

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

332

522125 IS AN ASSOCIATED PROJECT.

0TH SHARE $

BACON 522120

SR 32, EB MP 13.4-14.6; REALIGN SR 203@ SR 32 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.20 MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1994

$

12

CONST 1995

$

450

FED SHARE $ 360

GA. SHARE $

90

0TH SHARE $

BACON 522125

SR 32/ALMA FROM SR 4/PIERCE ST NE TO CR 323 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.10 MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 520910 IS AN ASSOCIATED PROJECT.

PE 1992

UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$ 1997

FED SHARE $ 1598

GA. SHARE $

399

0TH SHARE $

IV

,- .

, ~

, .

-

l!I!!!!!!!!

-~ ::; .

~

l!l!l!ilJi!!

~

~

l!!!l!!!!!

~


!!Mi~

I!!'-*-~

rrw.:;&i"~

~

~

.c:oii!'4 '

~...,"-'~!,.':1


!',f. ~-f''t"

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 13

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BALDWIN SR 22/24 RELOC FM CR 171 EAST TO SR 22/24 SPLIT

PE 1995 $ 168

222180 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

CONG DIST. 11

ROW

AFTER 96

PROJECT MILEAGE : 3.10

CONST

AFTER 96

MANAGER: H. ASHMORE

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

BALDWIN 231280

SR 22@ SR 29/US 441 IN MILLEDGEVILLE TURN LANES/ TRAFFIC PROJECT MILEAGE : ,28 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH

BALDWIN 241670

REMOVAL OF GA RAILROAD BRIDGE OVER US 441 BUSINESS
BRIDGES/ TRAFFIC PROJECT MILEAGE : .25 MANAGER: D. GRIFFITH

BALDWIN 270950

PRESERVATION OF HISTORIC DISTRICT IN MILLEDGEVILLE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 11 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 11 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 11 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

363

FED SHARE$

327

GA, SHARE$

36

0TH SHARE$

PE 1993 UNDERWAY

ROW 1994

$

2

CONST 1995 $ 142

FED SHARE $ 128

GA. SHARE $

14

0TH SHARE $

PE 1994 $

21

ROW 1994 $

44

CONST 1995 $

74

FED SHARE$

59

GA. SHARE$

13

0TH SHARE$

28

(

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 14

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

B-A-N-K-S-----C-O-U-N-T-Y--O--PE-R-A-T-E-D--P-U--B-L-IC---T-R-A-N-S-IT---S-E-R-V-IC--E------------------------------------------------------------------------------------

1Bl003 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 10

FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

OPERATING 1994 $

22

FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

9

BANKS 1Bl004

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1995 $

22

FUND SOURCE: RURAL TRANSIT

FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

9

BANKS 1Bl005

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH

CONG DIST. 10

c-

FUND SOURCE: RURAL TRANSIT

OPERATING 1996 $

24

FED SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

10

BANKS

I-85 SIGN MOD FM DEK CL TO SC STATE LN .. GWIN/JACKS/BAR/FRANK

PE NONE $

0

11044Y SIGNING/ MAINTENANCE

CONG DIST. 10 & 6

ROW NONE $

0

PROJECT MILEAGE : 76.00 ~EXIST.LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

110440 IS AN ASSOCIATED PROJECT.

0TH SHARE$

BANKS 1310.90

SR 51 FM THE SCHOOL NE TO SR 15/US 441
TURN LANES/ TRAFFIC. PROJECT MILEAGE : .43 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS

CONG DIST. 10
FUND.SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE . $

0

ROW 1994 $

1

CONST 1995 $ 190

FED SHARE$ 171

GA. - .SHARE $

1

0TH SHARE$

18

BANKS 141630

CR 132/LULA@ NORFOLK SOUTHERN RR/ID 717648N

RR XING. / TRAFFIC

PROJECT MILEAGE : .00 - EXIST, LANES: 2 /PROPOSED LANES: 2

MANAGER: W HESTER

.

CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE ROW NONE CONST

$

0

$

0

AFTER 96

'

II

(I'(''

!J

"' ,..

l!l!l!!ll!!!!!l

-

l!!!!l!!l!!!! 11!!!!!!!!1!1
:.

~

~

~

~

~

~.,

~

~

ft.";!~~

/1:i::~j

r::::,:

.~~ '

. . 1--:-,.,........

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 15

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-BA-R-R-O-W-----I--8-5--S-I-G-N--M--OD---FM---D-E-R--C-L--T-O--S-C--S-T-A-T-E--L-N-.-.-JA--C-K-/B-A--N-K-S-/G-W-.N-/-F-R-A-N-K---------------------------------------------PE---N-O-N-E-----$------0

11044X SIGNING/ MAINTENANCE

CONG DIST. 10 & 6

ROW NONE $

0

PROJECT MILEAGE : 76,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

110440 IS AN ASSOCIATED PROJECT,

0TH SHARE$

BARROW 121730

WINDER BYP FM SR 8@ SR 11 NEARS CL NE TO SR 53@ SR 11 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 2.60 MANAGER: J. GRAYBEAL (M)

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

187

AFTER 96

BARROW 132220

SR 211@ CR 326/MP 17.5l;CR 61/MP 21.05;CHATEAU ELAN/MP 22.0 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. PROJECT MILEAGE : 1.26 MANAGER: L. OWENS

BARROW 170725

CR 75/FRED KILCREASE RD@ APALACHEE RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE : .15 MANAGER: L. OWENS

BARROW 170726

CR 228/ROSS RD@ BEECH CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .15 MANAGER: L, OWENS

BARROW 170728

CR 72/BROWNS BRIDGE RD@ APALACHEE RIVER SW OF AUBURN REPLACEMENT OF THE EXISTING BRIDGES(S), FROM 1 TO 2 LANES.
PROJECT MILEAGE : .20 MANAGER:

CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY A!)MIN FUNDS

PE 1992 UNDERWAY

ROW 1995 $ 110

CONST 1996 $ 725

FED SHARE$

580

GA, SHARE$ 145

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1994

$

425

FED SHARE$

340

GA. SHARE$

85

0TH SHARE$

PE 1993 UNDERWAY ..

ROW LOCL

CONST 1994 $ 262

FED SHARE$

210

GA. SHARE$

52

0TH SHARE$

PE 1994 $

6

ROW LOCL

CONST 1996 $ 200

FED SHARE$

160

.GA, SHARE $

40

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 16

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY P, I.NO.

DESCRIPTION PROJECT DATA

BARTOW COUNTY OPERATED PUBLIC TRANSIT SERVICE

FISCAL

COST

-------------------------CO--M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

6B1328 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 7

FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $ 101

FED SHARE$

56

GA. SHARE$

0TH SHARE$

46

BARTOW 6B1329

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ 106

FED SHARE$

58

GA. SHARE$

0TH SHARE$

48

BARTOW 6B1330

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996

$

110

FED SHARE$

61

GA. SHARE$

0TH SHARE$

50

BARTOW 6C2328

ONE CONVERSION VAN AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1994

$

48

FUND SOURCE: RURAL TRANSIT

FED SHARE$

38

FEDERAL TRANSIT ADMIN .FUNDS

. GA. SHARE $

5

0TH SHARE$

5

BARTOW 6C2329

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW
MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS

CAPITAL 1995

$

32

FED SHARE $",

26

GA. SHARE$

3

0TH SHARE$

3

BARTOW 6C2330

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW
MANAGER: STEVE KISH

CONG.DIST. 7

CAPITAL 1996

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

2

0TH SHARE$

2

BARTOW 610950

I-75 MILL AND INLAY FM US 411/SR61 TO SR 140

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 7

PROJECT MILEAGE : 12.10 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

.

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1994 $ 2220

FED SHARE $ 1998

GA. SHARE $ 222

0TH SHARE $

....

,.,



..
' f

-

-

- -. ~

~

--

~

~

~

!).!~

Fi~.

M.'&l

~(\

j17:t,f~

c.:,:'el

~..

... f:-,.;..<.:--.-,1

i::

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 17

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O--. ------.--------P-R--O-JE-C-T---D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BARTOW I-75 AT SR 20

PE 1994' $

20

610960 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 7

ROW NONE $

0

PROJECT MILEAGE : .00

CONST 1995

$

233

MANAGER:

FUND SOURCE: I-STATE MAINT.

FED SHARE$ 210

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

23

0TH SHARE$

BARTOW 620832

SR 61@ ETOWAH RIVER REPLACEMENT OF THE EXISTING BRIDGES($). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .63 MANAGER: M. REYNOLDS

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621255 IS AN ASSOCIATED PROJECT.

PE NONE ROW 1988 CONST

$

0

UNDERWAY

AFTER 96

BARTOW 620833

SR 61@ TWO ETOWAH RIVER OVERFLOWS REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .36 MANAGER: M. REYNOLDS

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
621255 rs AN ASSOCIATED PROJECT.

PE 1996 ROW NONE CONST

$

10

$

0

AFTER 96

BARTOW 621130

SR 113: BRIDGE & APPROACHES OVER HILLS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .30 MANAGER: M GANNAWAY (M)

CONG DIST. 7
. FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621430 IS AN ASSOCIATED PROJECT .

PE 1988 ROW NONE CONST

UNDERWAY

$

0

AFTER96

BARTOW 621250

SR 61/CARTERSVILLE FM GILMER ST TO SR 20/INCL 1-WAY PAIR RECONSTRUCTION & WIDENING FROM 3 LANES TO 5 LANES. PROJECT MILEAGE : 2.30 MANAGER: BILL MCVEY (M)

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BARTOW 621255

SR 61/CARTERSVILLE FM CR 533 NORTH TO HENDERSON DRIVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES,
PROJECT MILEAGE : 2.61 MANAGER: M. REYNOLDS (M)

BARTOW 621350

SR 20 FM SR 61 TO I-75 (INCL INTCH W/SR 61 & US 41) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.47 MANAGER: BILL MCVEY (M)

CONG DIST. 7FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 620832 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST
PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96
UNDERWAY AFTER 96 AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 18

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A-----------------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BARTOW SR 113 RELOC FM PRESENT SR 113 TO CR 636;THENCE TO I-75

PE 1995

$ 184

621410 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.

coNG DIST. 7

ROW

AFTER 96

PROJECT MILEAGE : 7.70 MANAGER: M GANNAWAY (M)

FUND SOURCE: SURFACE TRANSPORT,

CONST

AFTER 96

FEDERAL HIGHWAY ADMIN FUNDS

BARTOW 621430

SR 113 FM S/TAYLORSVILLE CL NE TO CR 31/STILESBORO/POLK RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE i 4,57
MANAGER: M GANNAWAY (M)
,_.

BARTOW 621435

SR 113@ DRY CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .16 MANAGER: M GANNAWAY (M)

CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 621130 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL. HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 1954 AFTER 96

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

BARTOW 621440

SR 113 FM CR 31/STILESBORO NE TO SR 61 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4,39 MANAGER: M GANNAWAY (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$ 204 AFTER 96 AFTER 96

BARTOW 621445

SR 113@ RACCOON CREEK REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .17 MANAGER: M GANNAWAY (M)

CONG_ DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW NONE CONST

UNDERWAY

$

0

.AFTER 96

BARTOW 621500

SR 140 FM 0.3 MI W/OOTHKALOOGA CRK TO SR 3/US 41 RECONSTRUCTION& WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.00 MANAGER: M GANNAWAY (M)

BARTOW 621505

SR 140@ OOTHKALOOGA CRK & CSX RR REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .28 MANAGER: M GANNAWAY (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 621505 IS AN ASSOCIATED PROJECT.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621500.IS AN ASSOCIATED PROJECT,

PE 1992 ROW CONST
PE 1993 ROW NONE CONST

UNDERWAY AFTER 96 AFTER 96

UNDERWAY

$

0

AFTER 96

,.-

..

... ..

~

-~ ~ . ~--

~

~

~

~

~

~.,

~

~i~i~l,6,

~..:.....~~

~-',...,1/M

I<-:~

~

.- . i,,,,.-;-,,..,.,

r- . _.-._,

' -~.. .~>

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

Page 19

COUNTY

DESCRIPTION

FISCAL

COST

-P--, I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BARTOW SR 20/NEW ROUTE .. SEE FLOYD COUNTY_

PE 1993 UNDERWAY

62170X PRELIMINARY ENGINEERING/ NEW CONSTRUCTION

CONG DIST. 7

ROW NONE

$

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE $

0

MANAGER: UNKNOWN

FUND SOURCE: DEMONSTRATION PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

621700 IS AN ASSOCIATED PROJECT.

BARTOW 621760

STATE ROUTE 113@ RICHLAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: M GANNAWAY (M)

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW NONE
CONST

UNDERWAY

$

0

AFTER 96

BARTOW 621810

US 41-SR 3 FM MP 8.01 TO MP 9.02 IN THE CITY OF CARTERSVILLE INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : 1.01 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

BARTOW 631400

SR 3/US 41 FM POSTELLE TO MLK & MOCKINGBIRD IN CARTERSVILLE

INTERSECTION IMPROVEMENT/ TRAFFIC

PROJECT MILEAGE : 1.63 - EXIST. LANES: 6 /PROPOSED LANES: 6

MANAGER: BILL MCVEY

r.

CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

BARTOW 641500

CR 459/LOCAL ACCESS RD@ CSX RAILROAD BRIDGES/ TRAFFIC PROJECT MILEAGE : .15 MANAGER: M. REYNOLDS

CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

17

ROW 1995 $

10

CONST 1996 $ 578

FED SHARE$

578

GA. SHARE$

0TH SHARE$

PE 1994 UNDERWAY

ROW LOCL

CONST 1994 $ 785

FED SHARE$ 707

GA. SHARE$

79

0TH SHARE$

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

BARTOW 641870

SR 293@ GRASSDALE RD/CR 155 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .26 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: BILL MCVEY

BARTOW 670686

CR 114@ OOTHKALOOGA CRK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .17 MANAGER: BILL MCVEY

CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1994

$

70

CONST 1994 $ 170

FED SHARE$

136

GA. SHARE$

34

0TH SHARE$

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$

246

FED SHARE$

197

GA. SHARE$

49

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 20

PROJECT LISTING. BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BARTOW CR 204/NALLEY ROAD@ LITTLE PINE LOG CREEK 7.2 MIN OF WHITE

PE 1994 $

10

670688 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.

CONG DIST, 7

ROW LOCL

PROJECT MILEAGE : .21

CONST 1996

$

387

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

310

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

77

0TH SHARE$

BARTOW 670910

CARTERSVILLE STREETSCAPE MASTER PLAN; PED/BIKE PATHS LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST, 7
FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

ROW NONE

$

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

144 0
1106 885 29 250

BARTOW 72169X

N,MARS HILL EXT FM SR 3/COBB PKWY TO I-75/BARTOW COUNTY
UNKNOWN/ UNKNOWN PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. SMITH

r .

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 721690 IS_AN ASSOCIATED PROJECT.

PE 1992 ROW CONST

UNDERWAY
AFTER 96 AFTER 96

,.

,, ,

. '

~

~

l!!!!J!!!!I! ... ~

~

~

~

~

l!'J,.~

~/L~


t!fS.:::.~

l?.'[:'i'.,.U~l

:-::.:.:;~::.:~:

~f:t,',lf

r.1'1--'~

t. ~ ' . !

..

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 21

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BEN HILL SR 90@ ALAPAHA RIVER/ALSO TURNER CO

PE 1992

UNDERWAY

431040 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.

CONG DIST. 8

ROW 1994

$

1

PROJECT MILEAGE : 1.00

CONST 1995

$

718

MANAGER: J. LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

574

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 144

0TH SHARE$

BEN HILL SR 11 FM C&G @ BUSH ST, FITZGERALD TO C&G IN ABBE' LE .. WILCOX
431360 SHOULDER WORK/ MAINTENANCE PROJECT MILEAGE : 20.06 -.EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

345

FED SHARE$

276

GA. SHARE$

69

0TH SHARE$

BEN HILL SR 107/US 319 OVER STURGEON CREEK NEAR CR 5

442580 REPLACEMENT OF THE.EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .00

.

MANAGER:

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

10

$

1

AFTER 96

BEN HILL SR 90 OVER ALAPAHA RIVER OVERFLOW 442590 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:
BEN HILL TURN LANES ON ROANOKE & MERRIMAC DRIVES IN FITZGERALD 450360 TURN LANES/ TRAFFIC
PROJECT MILEAGE : 1.60 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: J. LINDSEY

CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8. FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

5

ROW 1995 $

1

CONST 1996

$

170

FED SHARE$

136

GA. SHARE$

34

0TH SHARE$

PE 1992 ROW LOCL CONST

UNDERWAY, AFTER 96

BEN HILL EVERGREEN CEMETERY ROAD OVER TURKEY CREEK IN FITZGERALD 450420 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER:

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

10

ROW LOCL

CONST 1996

$

180

FED SHARE$

144

GA. SHARE $

36

0TH SHARE$

,_.

j

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 22

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

B-P-IB-.B-I.-N-O--. -E-L-D-E-R-L-Y--A-N-D--D-I-SP-AR-BO-L-JEE-DC-T-V-D-EA-HT-I.CA-L-E-S--A-N-D---EQ--U-IP-M-E-N--T-----------------------------C-O-M-M-E-N-T-S-----. ----------------------Y-E-A-R--------E-S-T-S--

3V1010 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 8 & 2

FUNDS RECIPIENT: AGENCIES IN BIBB MPO AREA

CAPITAL 1994

$

38

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

30

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

BIBB 3Vl011

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPI~NT: AGENCIES IN BIBB MPO AREA MANAGER: STEVE KISH

CONG DIST. 9 & 2

CAPITAL 1995

$

39

FUND SOURCE: ELDERLY & DISABLED FUND FED -SHARE$

31

FEDERAL TRANSIT ADMIN FUNDS

.GA ..SHARE $

. 4,

0TH SHARE$

4

BIBB 3V1012

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIE IN BIBB MPO AREA, MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1996

$

41

FUND. SOURCE: ELDERLY & DISABLED FUND FED SHARE$

33

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

BIBB 310713

I-75@ I-16; SOU RR; ARKWRIGHT RD; US 23 & SR 87; & 31Y713 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 7.30. MANAGER: H. ASHMORE

MACON TIP f. 230-TSM. CONG DIST. ~
FUND SOURCE: NAT'L HIGHWAY FEDERAL .HIGHWAY ADMIN FUNDS 31Y710 IS AN ASSOCIATED PROJECT.

PE NONE $

ROW NONE $

CONST 1994

$;

FED SHARE $

GA. SHARE $.

0TH SHARE$

0 0 23_85
1908 477

BIBB 310980

I-16@ SR 540 INCL I-16 ML BR@ SAL RR; 1 STREAM & 1 RIVER INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .97 - EXIST, LANES: 2 /PROPOSED LANES: 4
MANAGER: BEN BUCHAN (M)

MACON TIP f llOC-MC CONG DIST. 8 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1987 UNDERWAY ROW 1989 UNDERWAY CONST 1996 $ 22468-
FED SHARE$ 17974 GA. SHARE $. 4494 0TH SHARE$

BIBB 311000

I-16 IN MACON, INTER MOD@ SR 11, SR 22, SR 87

INTERCHANGE/ RECST. OR REHAB.

PROJECT MILEAGE : 1.27 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: BEN BUCHAN (M)

.

MACON TIP I 180-MC
CONG DIST. 2:
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1987 UNDERWAY

ROW 1995 $ 320

CONST 1996 $ 3800

FED SHARE$ 3420

GA .. SHARE $

380

0TH SHARE$

BIBB 311130

I-16@ OCMULGEE RVR,WALNUT CK, OCMULGEE RVR OFLW
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : . 01 MANAGER: BEN BUCHAN (M)

MACON TIP I 270-TSM
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDER.AL HIGHWAY ADMIN FUNDS

PE 1986 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

\

'' "'.!Ii

. p

i

l!!J!!l!!!I!!!

I!!'.!!!'!!!!!!

. ~

~

~

~

ffi!!I~~

~

,. ~ .

~

B3!?::.t,

~as

~':'-"~~;

f:.~. .~:~~

I~~

,.:..;"""';'

. '

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 23

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

B--IB-B-------I--7-5/-M--A-C-O-N--F-M--P-I-E-R-C-E--A-V--E--EA--ST---TO---I--1-6------------------------------M-A-C-O-N--T-I-P--I--2-20-1-\.--M--C---------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

311400 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

CONG DIST. 8 & 2

ROW

AFTER 96

PROJECT MILEAGE : 1.62

CONST

AFTER 96

MANAGER: BEN BUCHAN (M)

FOND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

BIBB

I-16 FM I-75 EAST TO SR 11

, .

311410 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

PROJECT MILEAGE : 1.10

MANAGER: BEN BUCHAN (M)

MACON TIP I 190A-MC
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BIBB 311415

I-16/MACON FM SR 11 EAST TO SR 87 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10 MANAGER: BEN BUCHAN (M)

MACON TIP I 190B-MC
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

BIBB 311460

I-75@ HARTLEY BRIDGE RD/CR 740 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: BEN BUCHAN (M)

MACON TIP I 271-TSM
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 5000 AFTER 96

BIBB 311530

I-16@ SR 87/MLK JR. BLVD IN MACON LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E.. LAWS

BIBB 311560

I-75@ HARDEMAN AVE & FORSYTH ST
TURN LANES/ TRAFFIC PROJECT MILEAGE :- .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BEN BUCHAN

MACON TIP I 250-TSM
CONG DIST. 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP I 220-TSM
CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

70

FED SHARE$

56

GA. SHAAE $

14

0TH SHARE$

PE 1994 ROW 1995 CONST

UNDERWAY

$

190

AFTER 96

BIBB 311580

I-475 AT REST AREA I 19, MP 7.7NB
REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1994

$ 2000

FED SHARE $ 1800

GA. SHARE $

200

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 24

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

B--IB-B-------I--4-7-5--F-M---I--7-5--T-O--S--R--1-9-/-U-S---41-/-M-O-N-R-O-E-----------------------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY

311590 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CO~G DIST. 8 & 3

ROW NONE

$

0

PROJECT MILEAGE : 14.00 - EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: ..L. SEABROOK

.

FUND SOURCE: I-STATE MAINT.

CONST _1994

$ 10000

FED SHARE $ 9000

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1000

0TH SHARE $.

BIBB 311685

I-16 FM JCT I-75 TO TWIGGS/BLECKLEY CL ... TWIGGS

I

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 8

PROJECT MILEAGE: 31.70 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

.

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

31168Z IS AN ASSOCIATED PROJECT.

PE NONE

$

ROW 1994

$

CONST 1994

$

FED SHARE$

,GA. SHARE$

0TH SHARE_ $

0
0 4706 4235
471

BIBB 311750

NAPIER AVE OVER I-75; I-75 OVER RAMP TO SR 87 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:

CONG DIST.8 & 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE_
ROW _CONST

AFTER 96 .AFTER 96
AFTER 96

BIBB 31Y713

I-75@ 5 BRIDGES; FOR IM FUNDING; SEE 310713 UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

BIBB 322000

SR 87/RIVERSIDE DR/MACON FM HALL RD TO NORTHSIDE DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.29 MANAGER: ~EN BUCHAN

BIBB 322005

SR 87/RIVERSIDE DR/MACON@ SABBATH CREEK REHAB. OF-THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN

BIBB 33175X

HOUSTON RD FM SR 11 TO WALDEN/SARDIS;SEE HOUSTON SPLIT UA $ UNKNOWN/ UNKNOWN PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 230-MC CONG DIST. 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL_HIGHWAY ADMIN FUNDS 322005 IS AN ASSOCIATED PROJECT.
MACON TIP f 230-MC(2) CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322000 IS AN ASSOCIATED PROJECT.
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 331750 IS AN ASSOCIATED PROJECT,

PE NONE $

0

ROW NONE

$

0

CONST 1994

$: 300

FED SHARE$

270

GA .. SHARE $.

30

0TH SHARE$

PE 1992 UNDERWAY

ROW 1995 $ 250

CONST 1996 $ 3023

FED SHARE $ 2418

. GA. SHARE $

605

0TH SHARE $

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1996

$

320

FED SHARE $

256

GA. SHARE $

64

0TH SHARE $

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1996

$

277

FED SHARE $

222

GA. SHARE $

55

0TH SHARE $

,,
~~

'4

..

,, '

-: ~

!'!!ffllJ!9

~ !R!!'8 Mi.@ ~ ~ ~ ~ ~ ~i.511 ~:l!tM = ~ " t:.~~~ tee:-'::::, ~~}-';l ~.;..~

,-,.

"'

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 25

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------ BIBB

MILLERFIELD RD/MACON@ JEFFERSONVILLE RD

. MACON T-IP---f --10-0---T-S-M----------------------PE---N-O-N-E-----$------0

342080 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 2

ROW LOCL

PROJECT MILEAGE : .40 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

156

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

FED SHARE$

140

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

16

0TH SHARE$

BIBB 350520

WID & RCST FOREST HILL RD IN MACON: OVERLOOK TO WIMBISH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .60 MANAGER: D. CHURCH

MACON TIP f 141-MC CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1984 ROW LOCL CONST

UNDERWAY AFTER 96

BIBB 350560

SR 247/US 41/PIO NONO AVE FM I-75 TO SR 49/US 129/ RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 1.30 MANAGER: D. CHURCH

r.

BIBB 350760

CR 79/NORTHSIDE DR FM FOREST HILL RD TO SR 87/& SABBATH CK RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.60 MANAGER: BEN BUCHAN

BIBB 350820

HOUSTON RD FM WALDEN/SARDIS CH RDS TO SR 11 MINOR WIDEN & RESURF / RECST. OR REHAB. PROJECT MILEAGE : 3.20 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: GORDON BROWN(M)

BIBB 350960

SR 74 FM W/I-475 TO COLUMBUS RD (INCL BR OVER I-475) TURN LANES/ TRAFFIC PROJECT MILEAGE : 1.30 - EXIST. LANES: 4 /PROPOSED LANES:. 5 MANAGER: BEN BUCHAN (M)

BIBB 371030

LANDSCAPING OF CIVIC SQUARE FOR PARK IN MACON LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOS.ED LANES: 0
MANAGER: CORA COOK

MACON TIP f 140-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 210-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 150-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 339-MC CONG DIST. 8 & 2 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 & 8 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1987

UNDERWAY

CONST 1994

$ 2928

FED SHARE $ 2342

GA. SHARE $ 586

0TH SHARE $

PE 1992 UNDERWAY ROW LOCL
CONST 1995. $ 3811 FED SHARE$ 3049 GA. SHARE$ 762 0TH SHARE$

PE 1992

UNDERWAY

ROW LOCL

CONST 1995

$

757

FED SHARE$

606

GA. SHARE$ 151

0TH SHARE$

PE 1994

$

ROW 1995 $

CONST 1996 $

FED SHARE$

GA. SHARE$

0TH SHARE$

35 110 1238 1114 124

PE 1994

$

60

ROW LOCL

CONST 1994

$

240

FED SHARE$

192

GA. SHARE$

12

0TH SHARE$

60

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 26

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

B-P-IB-.BI-.-N-O--. -C-A--LL--B-O-X--ES--O-N--P-IR--1O-6-JE-CF-RT-O-MD-A--TSRA---8-7-/B-I-B-B---TO---I--9-5-/C-H-A--T-H-A-M-----------------------C-O-M-M-E-N-T-S--------------------------P-EY-E-A1-R9-9-4-----$-E-S-T-S-.-so

811030 MISCELLANEOUS IMPROVEMENTS/ NEW CONSTRUCTION

CONG DIST. 1 & 8

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1996 $ 1660

MANAGER:

.

FUND SOURCE: I-STATE MAINT.

FED SHARE$ 1494

FEDERAL HIGHWAY ADMIN FUNDS

GA, SHARE$ 166

0TH SHARE$

r_-

,.

1)1

<!'

,

'

. '

l!!!l!!!!!l

~

. l!Jll!!l!!!I ~

~

~

~

~

!,I..~

~~

= ~

~!Kt~

\~~~~-=~

w.~::~t,

~!~l

~~

'1

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

P~ge 27

COUNTY

DESCRIPTION

FISCAL

COST

-- P.I.NO.

PROJECT DATA

B--L-EC--K-LEY---CO-U--N-TY---O-P-ER-A--T-ED- -- PUBLIC--T-R-A-N-S-I-T--S-ERVICE

COMMENTS

YEAR

ESTS

----------------------------------------------------------------------------------

2B1088 TRANSIT FACILITIES/ OPERATIONS

. CONG DIST. 8

FUNDSRECIPIENT: BLECKLEY

OPERATING 1994 $

52

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

31

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

21

BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 281089 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1995 $

54

FUND SOURCE: RURAL TRANSIT

FED SHARE$

32

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

22

BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 281090 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY .
MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1996 $

58

FUND SOURCE: RURAL TRANSIT

FED SHARE$

34

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

24

BLECKLEY ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
2C2088 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH

CONG DIST. 8

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2089 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH

CONG DIST. 8

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2090 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH

CONG DIST. 8

FUND SOURCE: RURAL TRANSIT

CAPITAL 1996

$

21

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

BLECKLEY I-16 FROM TWIGGS CL TO US 441 IN LAURENS COUNTY

210670 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 8

PROJECT MILEAGE : 18.30 - EXIST. LANES: 4 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
4517 4065
452

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

P.age 28

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

B-L-E-C-K-L-E-Y--S-R--8-7-/-U-S--2-3--I-N--C-O-C-H--R-A-N-@----SO-U-T-H-E-R-N--R-R----------------------------------------------------'

-----~

----------Y-E-A-R---------E-S-T-S-PE 1985 UNDERWAY

221130 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 8

ROW 1988 UNDERWAY

PROJECT MILEAGE : .30

'CONST 1994

$ 1006

MANAGER: D. GRIFF~TH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

805

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

201

0TH SHARE $

BLECKLEY SR 87 FM S/BOLLINGER CRK-BLECKLEY TO SR 96/TWIGGS 222070 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 7. 79 MANAGER: H. ASHMORE(M)

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL "IGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST.

UNDERWAY

$

116

AFTER 96

BLECKLEY SR 87 FM SR 257 NW TO THE COCHRAN BYPASS 222360 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.50 MANAGER: H. ASHMORE(M)

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$

90

AFTER 96

AFTER 96

BLECKLEY SR 112: OVER BOLLINGER CREEK 242160 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:

CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW CONST

$

10

AFTER 96

AFTER 96

.,
!Y

r_-
"

,, r

j

,. F!M!e !!Ml! ,, ~ ~ ~ ~ ffi!!1 ~ e.ftttl ~~ ~ ~ ~~~ ~?~"."~ !'.!r1;-!~.i ~

. ,,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-.1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 29

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

BRANTLEY CR 11@ HILL CREEK WEST OF HOBOKEN

--------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PE 1994

$

4

570925 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 1

ROW LOCL

PROJECT MILEAGE : .20

CONST 1996

$

144

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

115

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

29

0TH SHARE$

! .

I

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE-TRANSPORTATION IMPROVEMENTS PROGRAM

Page 30

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BROOKS SR 94 FM W/CR 276 TOE OF WITHLACOOCHEE RVR/LOWNDES

PE 1992

UNDERWAY

421720 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 2

ROW

AFTER 96

PROJECT MILEAGE : 1.60

CONST

AFTER 96

MANAGER: K FULBRIGHT (M)

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

421722 IS AN ASSOCIATED PROJECT.

BROOKS 421722

SR 94@ LITTLE RVR;WITHLACOOCHEE RVR & OFLW/ALSO LOWNDES REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .20 MANAGER: K FULBRIGHT (M)

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421720 IS AN ASSOCIATED PROJECT.

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

BROOKS 421990

SR 94 NB FM MP 10.0-11.S;SB MP 1.6-3.1 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.00 MANAGER: J. LINDSEY

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

864

FED SHARE$

691

GA. SHARE$

173

0TH SHARE$

BROOKS 431420

SR 33 AT NORFOLK SOUTHERN RAILROAD ... f723472U
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER

CONG DIST. 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

75

FED SHARE$

68

GA. SHARE$

8

0TH SHARE$

BROOKS 470870

CR 268@ PISCOLA CREEK & OVERFLOW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .53 MANAGER: J. LINDSEY

CONG DIST. 2
FUND-SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 853 FED SHARE$ 682 GA. SHARE$ 171 0TH SHARE$

<.

:;

,.

1,

,, '

f

~

-~ ~

,, im= ~

~


~

~ ~

~ ~

~[~~

~ ==

~~m;~

!,tt:t:~

~~

tti~-:~

f:?;<:-~

Vi''-'~

el .....))

. ,, f'\',.,......

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 31

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BRYAN COUNTY OPERATED PUBLIC TRANSIT SERVICE

5Bl283 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 1

FUNDS RECIPIENT: BRYAN

OPERATING 1994

$

86

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

50

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

36

BRYAN 5B1284

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH

BRYAN 5B1285

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH

CONG DIST. 1

OPERATING 1995 $

91

FUND SOURCE: RURAL TRANSIT

FED SHARE$

53

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

38

CONG DIST. 1

OPERATING 1996

$

95

FUND SOURCE: RURAL TRANSIT

FED SHARE$

55

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

40

BRYAN 5C2283

ONE CONVERSION VAN AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH

CONG DIST. 1

CAPITAL 1994

$

48

FUND SOURCE: RURAL TRANSIT

FED SHARE$

38

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

OTH.SHARE $

5

BRYAN 5C2284

ONE CONVERSION VAN WITH LIFT
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH

CONG DIST. 1

CAPITAL 1995

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

BRYAN 51115X

I-95 FM JERICO RVR TO US 17 ... SEE LIBERTY CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 511150 IS AN ASSOCIATED PROJECT.

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

BRYAN 511190

I-16 WIDEN 10 BRIDGES@ MP 138.3; 145.9; 146.6; 146.8; 147.2 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

ROW NONE $

CONST 1996 $

FED SHARE$

GA. SHARE$

0TH SHARE$

75
0
2502 2252
250

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 32

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BRYAN I-95 FM 0.8 MIS/US 17 TO OGEECHEE RVR; FOR IM FUNDS

PE NONE $

0

51Y020 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

CONG DIST. 1

ROW NONE $

0

PROJECT MILEAGE : 5.40

CONST 1994 $ 5761

MANAGER:

FUND SOURCE: I-STATE MAINT.

FED SHARE$ 5185

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

576

0TH SHARE$

BRYAN 521750

US 17/RICHMOND HILL FM SR 144 N TO S/OGEECHEE RIVER OFLW BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.90
MANAGER: M. REYNOLDS

CONG DIST. 1
FUND SOURCE: SURF~CE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995 $ 3732

FED SHARE$ 2986

GA. SHARE$

746

0TH SHARE$

BRYAN 521755

WIDEN & NEW BRIDGE ON US 17@ OGEECHEE RIVER/ALSO CHATHAM CO
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : . 3 6 MANAGER: M.. REYNOLDS

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521750 IS AN ASSOCIATED PROJECT.

PE 1991

UNDERWAY

ROW NONE $

0

,CONST 1995 $ 2388

FED SHARE$ 1910

GA. SHARE$ 478

0TH SHARE$

BRYAN 521758

US 17/RICHMOND HILL FM 4-LN N/I-95 TON/SR 144/INCL NEW BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: M. REYNOLDS

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1992 UNDERWAY

CONST 1994

$ 5193

FED SHARE$ 4154

GA. SHARE$ 1039

0TH SHARE$

BRYAN 531130

SR 144/RICHMOND HILL FM CR 100 NW TO SR 25/US 17 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.57 MANAGER: M. REYNOLDS

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1990 UNDERWAY

CONST 1994

$ 1899

FED SHARE$ 1519

GA. SHARE$

369

0TH SHARE$

11

BRYAN 531220

SR 144/RICHMOND HILL FM WEST RAMPS@ I-95 EAST TO US 17 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.41 MANAGER: M; REYNOLDS

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994 $ 1643

FED SHARE$ 1314

GA. SHARE$

329

0TH SHARE$

BRYAN 532360

CR 90 FM OCEAN HWY/SR 25 TO PARK HILL RD/CR 154 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 6.92 MANAGER: PETE BLQ~KER.

CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$ 2525

FED SHARE$ 2020

GA. SHARE$

505

0TH SHARE$

.,, .~

,4

,, r

.....

~

I!!!!!!!!! ~ ~ ~ ~ ffif.!!fj !!JSJ,.6 ~ ~:S"i;~ ~~ ~!~~ ~;<-
~

~. .. f ... -,,..,

r?'""'~

~
I l

.r,-:,"'! '

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 33

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--

BRYAN CR 90/BELFAST-KELLER RO OVER TIVOLI RIVER

PE 1994

$

9

532410 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.

CONG DIST. 1

ROW LOCL

PROJECT MILEAGE : .20

CONST 1995

$

341

MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

273

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

68

0TH SHARE$

-----------:----------------------------------,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 34

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
BULLOCH COUNTY OPERATED PUBLIC TRANSIT SERVICE

5Bl518 TRANSIT PROJECTS/ OPERATIONS

CONG DIST. 1

FUNDS RECIPIENT: BULLOCH COUNTY

OPERATING 1994 $

41

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

17

BULLOCH 5Bl519

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH

CONG DIST, 1

OPERATING 1995 $

44

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

18

BULLOCH 5Bl520

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH

CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996 $ - 46

FED SHARE$

27

GA. SHARE$

0TH SHARE$

19

BULLOCH 5C2518

ONE CONVERSION VAN WITH LIFT AND MOBILE RADIO TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH

(_

BULLOCH 5C2519

TWO CONVERSION VANS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: BULLOCH COUNTY
MANAGER: STEVE KISH

CONG DIST. 1

FUND SOURCE: RURAL TRANSIT

CAPITAL 1994

$

32

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

CONG DIST, 1

CAPITAL 1995

$

58

FUND SOURCE: RURAL TRANSIT

FED SHARE$

46

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

6

0TH SHARE$

6

BULLOCH 521170

SR 73 W@ LOWER LOTTS CRK 6 MI SOUTH OF STATESBORO
BRIDGES/ OTHER PROJECT MILEAGE : ,30 MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

1

CONST 1995 $

96

FED SHARE $

77

GA. SHARE $

19

0TH SHARE $

BULLOCH 521270

SR 67 FM CR 248/585 NORTH TO 5-LN SECTION RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.40 MANAGER: PETE BLOCKER

CONG DIST. 1
"FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 521275 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1995 CONST

UNDERWAY

$

80

AFTER 96

_,, .,., -

,,

rf r

r

P!!!!!!

~

~ ~
-~

~

-

~

~

~

~

~

r,t'::"i;,"

,.~ . ...,j

~- -~.~. .. --!~,

~

~1 Ltt ,

;-.--,.,....,, iJ..

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-,1993 Page 35

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.
--- -----------------

PROJECT--D--A-T-A--

- -----------------------------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

BULLOCH SR 67@ LITTLE LOTTS CRK

PE 1992

UNDERWAY

521275 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 1

ROW NONE

$

0

PROJECT MILEAGE : . 20

CONST

AFTER 96

MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

521270 IS AN ASSOCIATED PROJECT.

BULLOCH 521800

SR 73/US 301 FM PACKING HOUSE RD TO NORTH OF CR 445 & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.45 MANAGER: RAY METTS (M)

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BULLOCH 521970

SR 26/STATESBORO FM BRANNEN RD/CR 482 TO SR 67/73/US 301 RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : 1.72 MANAGER: RAY METTS (C/M)

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BULLOCH 522230

OLD SR 46@ BLACK CREEK 1.2 MI W/SR 26 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : . 50 MANAGER: PETE BLOCKER

BULLOCH 522465

SR 67@ WOODCOCK BRANCH & ZETTEROWER BRANCH REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .12 MANAGER: RAY METTS (C/M)

BULLOCH SR 26/US 80 EB MP 7.1-8.2; WB MP 8.1-9.3

522470 ADDITION OF A PASSING LANE.

PROJECT MILEAGE : 2.30

MANAGER: PETE BLOCKER

.

CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 522460 IS AN ASSOCIATED PROJECT.
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW LOCL

CONST 1995 $ 859

FED SHARE$

687

GA. SHARE$

172

0TH SHARE$

PE 1992 ROW NONE CONST

UNDERWAY.

$

0

AFTER 96

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BULLOCH 522740

SR 26 AT ZETTERTOWER/STOCKYARD
TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

9

ROW 1995 $

10

CONST 1996

$

289

FED SHARE$ 289

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 36

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BULLOCH OLD.SR 46@ LITTLE LOTTS CK 11 MI SOUTH OF STATESBORO

PE 1993 UNDERWAY

531270 . REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 1

ROW LOCL

PROJECT MILEAGE : .22 MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

CONST 1995

$

575

.FED SHARE$

460

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

115

0TH SHARE$

BULLOCH 541950

SR 46 OVER LUKE SWAMP BRANCH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

10

$

1

AFTER 96

BULLOCH 550500

BRANNEN ST/GENTILLY RD FM SR 67 TO SR 26 INCL BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE: 1.47 MANAGER: PETE BLOCKER

BULLOCH 571010

STATESBORO GREENWAYS; LANDSCAPING.

BICYCLE/PED. FACILITY./ ENHANCEMENT
PROJECT MILEAGE : ;oo - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

r_

CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1996 $ 847

FED SHARE$

678

GA. SHARE$

169

0TH SHARE$

PE LOCL

ROW 1994 $ 200

CONST 1994 $ 175

FED SHARE$ 140

GA. SHARE$

40

0TH SHARE$

75

~ V

.,

,., r



~

@m

~ ,, ~ '

~

~

~

~

~

~
&

~

~~

m 1:--:,:.:

~~~7,}

f~.'.L'tl.~

. ~ '

..f- ..., . <

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 37

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D--A-T-~----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BURKE COUNTY OPERATED PUBLIC TRANSIT SERVICE

2Bl093 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 11

FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH

OPERATING 1994 $

68

FUND SOURCE: RURAL TRANSIT

FED SHARE$

40

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

28

BURKE 2Bl094

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS. RECIPIENT: BURKE MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1995 $

71

FUND SOURCE: RURAL TRANSIT

FED SHARE$

42

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

29

BURKE 2Bl095

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1996 $

75

FUND SOURCE: RURAL TRANSIT

FED SHARE$

44

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

31

BURKE 2C2093

TWO STANDARD VANS
TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH.

CONG DIST. 11

CAPITAL 1994

$

40

FUND SOURCE: RURAL TRANSIT

FED SHARE$

32

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

BURKE 2C2094

TWO STANDARD VANS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1995

$

40

FUND SOURCE: RURAL TRANSIT

FED SHARE $'

32 ,

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

BURKE 2C2095

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH

CONG DIST. 11

.

FUND SOURCE: RURAL TRANSIT

CAPITAL 1996

$

32

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $.

3

0TH SHARE$

3

BURKE 221190

SR 56/SR 80 NE OF WAYNESBORO@ BRIER CRK BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .46 MANAGER: D. GRIFFITH

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$ 1876

FED SHARE $ 1501

GA. SHARE $ 375

0TH SHARE $

. \

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 38

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

p. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

B-U-R-K-E-----S-R---56--A-T--N-O--R-FO-L-K---SO-U-T-H-E-R-N---R-A-IL-R-O-A-D----.-f6-2-0-2-9-0-W-------------------------------------------------------------P-E--N-O-N-E-----$----- 0

231500 RR XING / TRAFFIC

CONG DIST. 11

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

75

MANAGER: W HESTER

FUND SOURCE: HWY. SAFETY

FED SHARE$

68

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

8

0TH SHARE$

BURKE 270840

79 AC MUNDY WETLAND MITIGATION SITE N/SR 56;NE OF WAYNESBORO RIGHTS-OF-WAY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1994

$

125

CONST 1994

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

BURKE 270890

BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 2
BRIDGE PAINTING /MAINTENANCE PROJECT MILEAGE: .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE $

.CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 1314 1051 263

(.

') .-i



1,.

,r .-

(4 t,

~

@I!!!!

!!!Ml i ~ .},.,.,,'-' !I

~

~

fflii

-,:,;,.c~

~

~
If

~~ J:::.'t:::~
j

;;:.:;:::=.~

/'.,;:~

~

~ i:,----\,.

~ , . . .

j ~-.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 39.

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ----------------P-R-O-J-E-C-T--D-A-T-A----------------------------~r-. ----------------C-O-M-M--EN-T-S----------------------------Y-EA-R---------E-S-T-S--

BUTTS I-75@ SR 36 FM 0.5 MI SW/I-75 TO 0.55 MI NE/I-75[& BRIDGE]

PE 1992 UNDERWAY

311380 INTERCHANGE/ RECST. OR REHAB.

CONG DIST. 11

ROW 1994 $ 10181

PROJECT MILEAGE : 1.10 - EXIST. LANES: 2 /PROPOSED LANES: 4

CONST 1995 $ 4577

MANAGER: H. ASHMORE (C)

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 4119

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

458

0TH SHARE $

BUTTS 311730

I-75: SR 36 OVER I-75 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

10

ROW 1995 $

1

CONST 1996 $ 169

FED SHARE$

152

GA. SHARE$

17

0TH SHARE$

BUTTS 322440

SR 36/JACKSON FM SR 16 TO CR 289/STARK RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .63 MANAGER: H. ASHMORE(M)

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BUTTS 332060

SR 16 OVER YELLOW WATER CREEK REPLACEMENT OF THE EXISTING BRIDGES{$). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

11

ROW 1995 $

1

CONST 1996 $ 741

FED SHARE$ 593

GA. SHARE$ 148

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 40

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-5PA-1M-1. -0ID.-7ENN0-O--. -R-I-E-9C-5O--N-FSM-TR-FU-L-CA-T-IOL-NI-NP-RE-&O-WT-JEO-ICD-T-HE-NA-DIRN-ARG-TIA-E-FTR-TO-SM-BL4UL-FAF-N-R-ES-D-/I-TNO-C--L6--BL-AR-N@-E-S-C.-ROOKED---R-V-R------C-O.NG--D-C-IO-SM-T-M. -E-1N-T-S-------------------------RO-PWE-Y-EA-N1R-O9-N9-E3-----U$-NE-DS-ETR-SW--AY0

PROJECT MILEAGE : 7. 22

l .

CONST 1995

$ 21500

MANAGER: J. GRAYBEAL

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$ 17200

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 4300

0TH SHARE$

CAMDEN 511075

I-95@ ST MARY'S RIVER@ FLA STATE LINE; & 51Y075 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .23 MANAGER: J. GRAYBEAL

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 4775

FED SHARE$ 3820

GA. SHARE$ 1438

0TH SHARE$ 2393

CAMDEN 511080

I-95 FM HARRIETT'S BLUFF RD TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 6.72 MANAGER: J. GRAYBEAL

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 10608

FED SHARE$ 8486

GA. SHARE$ 2122

0TH SHARE$

CAMDEN 511082

I-95 FM SR 25 SPUR TO CR 138/INCL BRIDGES RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 8.44 MANAGER: J. GRAYBEAL

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 21000

FED SHARE$ 16800

GA. SHARE $ 4200

0TH SHARE$

CAMDEN 511084

I-95 FM.CR 138 TO US 17/GLYNN & BR@ L SATILLA RVR .. GLYNN RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 6.76 MANAGER: J, GRAYBEAL .

BRUNSWICK TIP f BATS93-11 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL.HIGHWAY ADMIN FUNDS

PE 1996 $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

231 0
11568 9254 2314

CAMDEN 51Y075

I-95@ ST. MARY'S RV@ FLA STATE LINE; FOR IM$; SEE 511075 UNKNOWN/ UNKNOWN PROJECT MILEAGE .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 250

FED SHARE$ 225

GA. SHARE$

25

0TH SHARE$

CAMDEN 521910

SR 40@ SATURDAY PARK SC AND FOOD LION PLAZA INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE : .50 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 233

FED SHARE$- 186

GA. SHARE$

47

0TH SHARE $

,,.. ,.
l ~,

., .

' .

.... "'',''

~

l@B

. M@J ~ ,

~

~

= ~

~.!W!!

~L!fj

_,_1--- ~,w.iifj

..

"

.. ,;.,.;.-.,.,.,V,..<..,J..

:,~~r~~~:-:.::1

/,:~'.:~

Mt~

.. ,.~ ~,.:~-~

t:" .....,.._,
...

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 41

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-----------------------------------------------------------------------------------------------------------------------------------

CAMDEN SR 40 FM W/CR 61 TO SR 25/US 17

PE 1992 UNDERWAY

522080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 1

ROW

AFTER 96

PROJECT MILEAGE : 3.86

CONST

AFTER 96

MANAGER: H. ASHMORE (CM)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

CAMDEN 522690

SR 25/US 17 BRIDGE OVER ST. MARY'S RIVER /FLA STATE LINE
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .oo
MANAGER:

CAMDEN 532480

SR 40@ CR 81 AND I-95 SB ON/OFF RAMPS IN KINGSLAND INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .14 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: PETE BLOCKER

CAMDEN 571000

A STUDY OF BIKE/PEDESTRIAN PATHS IN COASTAL GEORGIA
PRELIMINARY ENGINEERING/ ENHANCEMENT PROJECT MILEAGE : .00 --EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

ROW 1994 $

CONST 1995 $

FED SHARE$

GA. SHARE$

0TH SHARE$

300 5
3050 2440
610

PE NONE

$

0

ROW LOCL

CONST 1994

$

275

FED SHARE$ 248

GA. SHARE$

28

0TH SHARE$

PE 1994

$

125

ROW NONE $

0

CONST NONE $

0

CAMDEN 571050

WOODBINE WATERFRONT BOARDWALK, SIDEWALK AND LANDSCAPING BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

59

ROW NONE $

0

CONST 1994

$

609

FED SHARE$

487

GA. SHARE$

12

0TH SHARE$

134

r

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P. I.NO.

PROJECT DATA

COMMENTS

C-A--R-R-O-LL---C-S--8-2-4-/S-T-E-W--A-R-T--S-T-/-C-A-R-R-O-L-L-T-O--N-@--C--U-R-T-IS---C-R-E-EK-------------------------------- - ---------- --

350660 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.

CONG DIST. 7

PROJECT MILEAGE : .25

MANAGER: BILL MCVEY

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 42

FISCAL

COST

YEAR

,. ESTS

-------------------------

PE1991

UNDERWAY

ROW LOCL

CONST 1996 $ 303

FED SHARE$ 242

GA. SHARE$

61

0TH SHARE$

CARROLL 370725

CR 813/STATE LINE RD@ BIG INDIAN CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .30 MANAGER: BILL MCVEY

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1990 UNDERWAY

ROW LOCL

CONST 1994 $ 391

FED SHARE$ 313

GA. SHARE$

78

0TH SHARE$

CARROLL 61091X

I-20 SAFETY IMPROVEMENTS FRM ALA STATE LINE TO SR 61/HARALSO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

CARROLL 621770

CARROLLTON BYP FM 4-LN S/US 27A TO 4-LN ON BANKHEAD/& CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.78 MANAGER: RON BRAZIEL

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994 $

10

CONST 1995 $ 5865

FED SHARE$ 4692

GA. SHARE $. 1173

0TH SHARE$

CARROLL 621820

SR 61 AT SR 166 SIGNALS/ TRAFFIC PROJECT MILEAGE .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

7

ROW NONE $

0

CONST 1996 $ 231

FED SHARE$ 231

GA. SHARE $.

0TH SHARE$

CARROLL 631300

SR 166 FM CR 828/141 TO 4-LN/CARROLLTON .. INCL BRIDGES RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 5.65 MANAGER: RON BRAZIEL (M)

CONG DIST. 7
FUND. SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 5607 AFTER 96

CARROLL 631310

SR 166 FM SR 100/BOWOEN TO CR 828 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.10 MANAGER: RON BRAZIEL (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY
AFTER 96 AFTER 96

....

~ ..

'('l

fFM

~ ~

. ~ ~ "'

~

~
~!lll

~ ~

rn~

~,~

. . h~ ~i;'t,$\

~:~-:,::~

. ~;::\ ,~

I::;::~

i:r;;.,.;:~,

.. r.""l'~

..., .

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 43

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

-------------------------------------------------------------------------

------C-O-M-M-E-N-T-S---------------------------Y-E-A-R---------E-S-T-S--

CARROLL SR 16/US 27ALT FM SR 166 SE TOW OF STRIPLING CHAP RD/CR 24

PE 1993 UNDERWAY

631320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 7

ROW 1994 $ 1531

PROJECT MILEAGE : 1.65

CONST 1995 $ 4282

MANAGER: RON, BRAZIEL (C)

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 3426

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

856

0TH SHARE $

CARROLL 641890

N CARROLLTON BYP/SR 166 CONN. FM SR 1 TO SR 166 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.90 MANAGER: RON BRAZIEL (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY
$ 2429 AFTER 96

CARROLL 641910

SR 100 NB MP 5.30-4.28: SB MP 6.9-7.89 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.01 MANAGER: BILL MCVEY (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

26

$ 164

AFTER 96

CARROLL 650480

SR 8/US 78 AT CS 777 TURN LANES/ TRAFFIC PROJECT MILEAGE : .23 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER:

CARROLL 662500

CR 217/PLOWSHARE RD@ BUCK CREEK

.

1.

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .25

MANAGER: BILL MCVEY

CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

9 0 . 165
149 17

PE 1992

UNDERWAY

ROW LOCL

CONST 1994 $ 339

FED SHARE$ 271

GA. SHARE$

68

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 44

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CATOOSA COUNTY OPERATED PUBLIC TRANSIT SERVICE

6B1333 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: CATOOSA

OPERATING 1994

$

88

MANAGER: STEVE KISH

FU~D SOURCE: RURAL TRANSIT

FED SHARE$

47

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

42

CATOOSA 6B1334

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

92

FUND SOURCE: RURAL TRANSIT

FED SHARE$

49

FEDERAL TRANSIT ADMIN FUNDS

"GA. SHARE$

0TH SHARE$

43

CATOOSA 6B1335

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS . FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1996 $

96

FUND SOURCE: RURAL TRANSIT

FED SHARE$

51

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

45

CATOOSA 6C2333

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1994

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL-TRANSIT ADMIN FUNDS

GA .. SHARE $

2

0TH SHARE$

2

CATOOSA 6C2334

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA
MANAGER: STEVE KISH

CATOOSA 6C2335

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA
MANAGER: STEVE KISH

CONG DIST. 9 FUND SOURCE:. RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
I
CONG DIST.. 9 FUND. SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CATOOSA 610720

PE & DESIGN FOR REPLACING WELCOME CENTER/I-75 N. OF RINGGOLD
REST AREA/ NEW CONSTRUCTION PROJECT MILEAGE : .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RON BRAZIEL (C)

CHATTANOOGA TIP I 3 CONG DIST. 9
FUND.SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

CAPITAL 1995

$

29

FED SHARE $ 23

GA. SHARE$

3

0TH SHARE$

3

CAPITAL 1996

$

32

FED SHARE$

26

GA. SHARE $

3

0TH SHARE$

3

PE 1991 UNDERWAY

ROW 1994

$

672

CONST 1995 $ 4080

FED SHARE$ 3672

GA. SHARE$ 592

0TH SHARE $ 1000

.,
).r

' .

'll'

~

~

-~ .I le

~

~

ffl~

tt-~~

~IS

.. ~~~ ~,,

tl~!:.::~

~1.~~- ..... !J

t~._~,~~t~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

CATOOSA 610730

I-75@ SR 3/US 41

INTERCHANGE/ RECST. OR REHAB.

PROJECT MILEAGE : .35 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: EX PASSMORE

.

CHATTANOOGA TIP t 10
CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

..~~i

.,,,"'

16-Sep-1993 Page 45

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1995

$

120

CONST l!:196

$ 1720

FED SHARE $ 1548

GA. SHARE $

172

0TH SHARE $

CATOOSA 610800

I-75 FM SR 2 TO SR 146 RECONSTRUCTION & WIDENING FROM 6 LANES TO 8 LANES. PROJECT MILEAGE : 3.63 MANAGER: RAY METTS (M)

CHATTANOOGA TIP t 14
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY
$ 1000 AFTER 96

CATOOSA 610810

I-75 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 6 LANES TO 8 LANES. PROJECT MILEAGE : 1.42 MANAGER: RAY METTS (M)

CHATTANOOGA TIP t 13
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY
$ 500 AFTER 96

CATOOSA 610820

CO SYSTEM FM S/SCRUGGS RD TO TENNESSEE STATE LINE CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : .50 MANAGER: RAY METTS (M)

CHATTANOOGA TIP t 12
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS

PE 1993 ROW 1995 CONST

UNDERWAY $ 107 AFTER 96

CATOOSA 621530

SR 151 FM RELOC. HACKETT RD/CR 179 N TO I-75@ RINGGOLD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.30 MANAGER: M GANNAWAY (M)

CATOOSA 631190

CR 382/0LD SR 2@ SOUTH CHICKAMAUGA CRK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
PROJECT MILEAGE : .18 MANAGER: BILL MCVEY

CATOOSA 631420

SR 2/SR 3/US 41 AT SPARKS STREET IN NASHVILLE TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CHATTANOOGA TIP t 16
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y530 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP t 8
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 200 AFTER 96

PE 1992 UNDERWAY

ROW LOCL

CONST 1995 $ 303

FED SHARE$ 242

GA. SHARE$

61

0TH SHARE$

PE NONE $

0

ROW 1994

$

10

CONST 1995

$

173

FED SHARE$

173

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 46

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-AP-T-.IO-.O-N-SOA--. -S-R---1-4-6-@--C-R---80-;-P@R--O-CJE-SC--Tj4--7D-A;-T-A@--C-R--5-8-/--C-R--5-8-@---S-R--2--------------------C-H-A-T-T-A.NCOO-OM-G-MA-E-NT-TSI-P--f--6---------------------P-EY-E-A1-R9-9-3-----U-NE-DS-ETR-SW--AY

641820 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 9

ROW 1994

$

100

PROJECT MILEAGE: .SO - EXIST. LANES: 2 /PROPOSED LANES: 2

CONST 1995

$

741

MANAGER: BILL MCVEY

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $

593

FEDERAL HIGHWAY AOMIN FUNDS

GA. SHARE $

148

0TH SHARE $

CATOOSA 650430

SR 3/US 41 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .66 MANAGER: M GANNAWAY (M)

CHATTANOOGA TIP f 11 CONG oisT. 9
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY AOMIN FUNDS

PE 1993
ROW 1995 CONST

UNDERWAY
$ 165 AFTER 96

CATOOSA 650440

SR 146/CLOUO SPRINGS RO FM LAKEVIEW OR TO I-75/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2. 34 MANAGER: M GANNAWAY (M)

CATOOSA 650500

SR 146 AT CROSS STREET SIGNALS/ TRAFFIC: PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

CATOOSA 65Y440

SR 146/CLOUO SPGS RO FM LAKEVIEW TO I-75&BRIOGE .. SEE 650440 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES .. PROJECT MILEAGE: 2.34 MANAGER: M GANNAWAY

CATOOSA CR 259 SOUTH OF RINGGOLD@ LITTLE CHICKAMAUGA CRR 670710 .REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
.PROJECT MILEAGE : .14
MANAGER: BILL MCVEY

CHATTANOOGA TIP f 15 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 65Y440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP f 22 CONG [?IST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
CHATTANOOGA TIP f 15 CONG DIST. 9
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY AOMIN FUNDS 650440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP f 5 CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 1167 AFTER 96

PE NONE $

0

ROW NONE $

0

CONST 1996 $

64

_FED SHARE$

51

GA. SHARE$

_13

0TH SHARE$

PE 1992 ROW 1996 CONST.

UNDERWAY $ 544 AFTER 96

PE 1994 ROW LOCL CONST

$ 180 AFTER 96

CATOOSA 670810

HISTORIC RAIL DEPOT RESTORATION IN RINGGOLD MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY AOMIN FUNDS

PE LOCL

ROW LOCL

CONST 1995 $

35

FED SHARE$

28

GA. SHARE$

0TH SHARE$

7

,.

,,

I

...._ ,

~

~

~ ~


~

~

~

~

~

~

. ~..:Ji!

m:*\

'./.~....:-,--.,

~:;.-::.-::,::~

\:,';,:.,>~

.~~ r-~- "\-

'

'Ji.

COUNTY P,I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

16-Sep-1993 Page 47

FISCAL YEAR

COST ESTS

CHARLTON SR 852/FOLKSTON FM CR 138 NE ON NEW LOC TO US 1 521900 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .50 MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1994

$

256

CONST 1994

$ 1925

FED SHARE $ 1540

GA. SHARE $ 385

0TH SHARE $

CHARLTON SR 40 E/FOLKSTON: l)EB MP 1.65-3.0; 2)WB MP 3.7-5.2
522350 ADDITION OF A PASSIN.G LANE. PROJECT MILEAGE : 2.85 MANAGER: PETE BLOCKER

CO.NG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY

$

13

AFTER 96

CHARLTON SR 94@ ST MARYS RIVER AT FLORIDA STATE LINE 531300 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : 1.00 MANAGER: PETE BLOCKER

CONG DIST. l
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY

$

2

AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LIS~ING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 48

COUNTY P, I.NO.
CHATHAM

DESCRIPTION PROJECT DATA
PROPERTY PURCHASE, FACILITY

EXP.,

8 TRANSIT COACHES,

FISCAL

COST

E-T-C-. ---------------C-OM--M-E-N-T-S---------------------------Y-E-A-R-.-------E-S-T-S--

505010 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 1 & 11

FUNDS RECIPIENT: CHATHAM AREA TRANSIT MANAGER: STEVE KISH

CAPITAL 1994

$ 4000

FUND SOURCE: URBAN TRANSIT DISC,

FED SHARE$ 3200

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$ 400

0TH SHARE$ 400

CHATHAM 505011

CAP. MAINT., VEHICLES, FACILTIY IMP., TOOLS, FURNITURE;. ETC
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH

<
CONG DIST .. l & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1995

$ 340

FED SHARE$

272

GA. SHARE$

34

0TH SHARE$

34

CHATHAM .505012

CAP. MAINT., VEHICLES, TOOLS, EQUIPMENT, FACILITY IMP., ETC TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH.

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$

370

FED SHARE$ 296

GA. SHARE$

37

0TH SHARE$

37

CHATHAM 505014

PUBLIC TRANSIT SERVICE FOR SAVANNAH AND CHATHAM COUNTY

TRANSIT PROJECTS/ OPERATIONS

.

FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM

MANAGER: STEVE KISH

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

3473
1702 1702 3473

CHATHAM 505015

PUBLIC TRANSIT SERVICE FOR SAVANNAH AND. CHATHAM COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $
FED SHARE$ GA. SHARE $ 0TH SHARE$

4536 907 907
4536

CHATHAM 505016

PUBLIC TRANSIT SERVICE FOR SAVANNAH AND CHATHAM COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST, 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

4266 896 896
4266

CHATHAM 5V1010

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH

CONG DIST. 1 & 11

CAPITAL 1994

$

54

FUND.SOURCE: ELDERLY & QISABLED FUND FED SHARE$

43

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

6

0TH SHARE$

5

- ,.,

...

~

-

1!!18

~

~

~

~

~

~

~

~
fl

~-:::t::.::;:.i

/!t~:\:~:;t . i~:::::~~~~~

1;;.:1.~~

... .,,. riit>.l~i t-~-:-~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 49

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

(_ .

FISCAL

COST

-P--, -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
CHATHAM ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

5Vl011 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 1 & 11

FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA

CAPITAL 1995

$

56

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $.

45

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

0TH SHARE$

6

CHATHAM 5Vl012

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH

CONG DIST. 1 & 11

CAPITAL 1996

$

58

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

46

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

6

0TH SHARE$

6

CHATHAM 510936

SR 404/US 17A LANDSCAPING FOR TALMADGE MEMORIAL BRIDGE LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : ,00 ~EXIST.LANES: 0 /PROPOSED LANES: 0 MANAGER: E. LAWS

SAVANNAH TIP f 94-H-10 CONG DIST. 1 & 11
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

. 0

CONST 1994

$

750

FED SHARE$

600

GA. SHARE $

150

0TH SHARE$

CHATHAM 511010

I-95 TRUCK RAMP & WEIGH STATION JUST SOUTH/ SC LINE & 51Y010 WEIGH STATION/ RECST. OR REHAB. PROJECT MILEAGE : .38 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: RON BRAZIEL (C)

SAVANNAH TIP f 94-H-3 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1994

$

161

CONST 1994

$ 3212

FED SHARE$ 2570

GA. SHARE$

642

0TH SHARE$

CHATHAM 51102X

I-95 FM 0.8 MIS/US 17-BRYAN CO TO OGEECHEE.RVR/INCL RVR BRS

RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

PROJECT MILEAGE : .00

.

MANAGER: H. ASHMORE

CONG DIST, 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 511020 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1994

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

CHATHAM 511060

I-95@ CR 984/JIMMY DELOACH PKWY
INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CHURCH (M)

SAVANNAH TIP f 91-H-8
CONG DIST, 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1996 $ 6000 FED SHARE$ 4800 GA. SHARE$ 1200 0TH SHARE$

CHATHAM 511160

I-95 FM N/I-16 IN CHATHAM THRU EFFINGHAM TO S.C. SL;& 51Yl60 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 13.10 MANAGER: \. REYNOLDS

SAVANNAH TIP f 93-H-2 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL.HIGHWAY ADMIN FUNDS

PE 1994

$

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

396
0 23897 19118
4779

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 50

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-H-A-T-H-A-M----I--1-6--A-T--M-P--1--6-5-.1-,--1--6-4-.0--, --1-6-3-.-2-, --1-6-2-.-3-, --A-ND---I--5-1-6---IN-T-E-R-C-H-A-N--G-E------S-A-V-A-N-N-A-H--T-I-P--I--9-4--H----2-------------------PE---1-9-9-5-----$-----1-10

511180 BRIDGES/ RECST. OR REHAB.

CO~G DIST. 1

ROW NONE

$

0

PROJECT MILEAGE : .00

CONST

AFTER 96

MANAGER:

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 511200

I-16 FM I-95 TO END OF I-16@ MP 166.3 & LIGHT,SGN,WALLS GUARDRAIL/ TRAFFIC PROJECT MFLEAGE : 9.20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

'

CHATHAM 51Y010

I-95 TRUCK RAMP AND WEIGH STAT.; FOR IM FUND; SEE 511010
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CHATHAM 51Yl60

I-95 FM N/I~16 TO SC STATE LINE; FOR IM$; SEE 511160 UNKNOWN/ UNKNOWN . PROJECT MILEAGE .00 - EXIST.' LANES: 0 /PROPOSED LANES: 0
MANAGER:

CHATHAM 521495

SR 204/ABERCORN.ST@ SOUTHWEST BYP INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : 1.14 ._EXIST.LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS

CHATHAM 521505

HARRY S.TRUMAN PKY/PH IV FM WHITFIELD AVE TO MONTGOMERY X-RD CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.90 MANAGER: G. ROSS

SAVANNAH TIP I 94-H-1
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP f 91-H-14
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP I 87-H-10
CONG DIST. 1 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1994 $ 1234

FED SHARE$ 1234

GA. SHARE$

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994

$

350

FED SHARE$ 315

GA. SHARE$

35

0TH SHARE$

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$
0TH SHARE$

0 0 2500 2250 250

PE 1992

'
UNDERWAY

ROW LOCL

CONST 1996 $ 7297

FED SHARE$ 5838

GA. SHARE$ 1459

0TH SHARE$

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

CHATHAM 521508

HARRY S.TRUMAN PKY/PH III FM MONTGOMERY X-RD TO DERENNE AVE CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: G. ROSS

SAVANNAH TIP I 87-H-9,
CONG DIST._l & 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

,,

.....,

l!B

~

~

~

~

~

~

~

~

~

~~
I

~:~:.:;:,:~

~;-:~~:. ,,:

[(~:~?::~::!

1:.:x-n~~

~~'-A~ ~ ,,.

. . /:...., ...;,~~ ~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 51

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--, ---------------P-R-O--JE-C-T---D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHATHAM HARRY S TRUMAN PKWY FM S OF HENRY-ANDERSON TO PRESIDENT ST

SAVANNAH TIP f 87-H-8

PE 1992 UNDERWAY

521680 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

CONG DIST. 11

ROW LOCL

PROJECT MILEAGE : 1.70

CONST 1994

$ 29701

MANAGER: G. ROSS

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$ 23761

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 5940

0TH SHARE$

CHATHAM 52175X

US 17@ OGEECHEE RIVER/SEE BRYAN COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: M. REYNOLDS

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521755 IS AN ASSOCIATED PROJECT.

PE 1991 UNDERWAY

ROW NONE

$

0

CONST 1995 $

0

FED SHARE $

GA. SHARE $

0TH SHARE $

CHATHAM 521770

SR 26 FM BRYANWOOD RD TOW/BULL RIV INCLD BIKE LANE & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.94 MANAGER: G. ROSS

SAVANNAH TIP f 87-H-34 CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 52Y770 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1996 CONST

UNDERWAY $ 200 AFTER 96

CHATHAM 521780

SR 26/GARDEN CITY FM CR 704 TO SR 25/US 17;INCL CLVT EXT
TURN LANES/ TRAFFIC PROJECT MILEAGE : .70 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D, SMITH

SAVANNAH TIP f 90-H-8 CONG DIST. l
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$

100

CONST 1994

$

826

FED SHARE$

743

GA. SHARE$

83

0TH SHARE$

CHATHAM 521855

SR 26 FM 4-LN E/LYNES PKWY TO VICTORY DR/CS 188 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.38 MANAGER: G. ROSS

SAVANNAH TIP f 87-H-18b CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 5620 FED SHARE$ 4496 GA. SHARE$ 1686 0TH SHARE$ 2810

CHATHAM 521860

SR 25 FM 4-LN N/SR 204 NE TO SR 307(INCL PARALLEL BRIDGE) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.40 MANAGER: G, ROSS (C)

SAVANNAH TIP t 90-H-6
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL CONST 1996 $ 5976
FED SHARE$ 4781 GA. SHARE$ 1195 0TH SHARE$

CHATHAM 521865

SR 25/US 17 FM OGEECHEE RVR OFLW TO S/SR 204(& NEW BR) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.75 MANAGER: G. ROSS (C)

SAVANNAH TIP t 90-H-7
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521867 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW LOCL

CONST 1996 $ 4281

FED SHARE$ 3425

GA. SHARE$

856

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 52

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-HP-A-,IT-.H-NA-OM--. --SR---2-5/-U-S---17-/-0-C-EP-AR-NO--JE-HC-WT-Y-@-D-A-OT-AG-E-E-C-HEE---R-IV-E-R--O--V-ER-F-L-O-W--------------------SA-V-A-N-N--AC-HO-M-TM-IE-PN-T-St--9-0--H----7-------------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY

521867 REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES,

CONG DIST, 1

ROW LOCL

PROJECT MILEAGE : .05_ MANAGER: G. ROSS (C)

FUND SOURCE: BRIDGE PROGRAM

CONST 1996

$

445

FED SHARE$

356

FEDERAL HIGHWAY. ADMIN FUNDS

GA. SHARE$

89

521865 IS AN ASSOCIATED PROJECT.

0TH SHARE$

CHATHAM 52217X

SR 17/US 80 FM SR 27 TO CHERRY ST IN BLOOMINGDALE/EFFINGHAM RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.67 MANAGER: UNKNOWN
r:-

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 522170 IS AN ASSOCIATED PROJECT.

PE 1994 ROW 1996 CONST

$

0

$

0

AFTER 96

CHATHAM 522490

SR 26/US80 FM W OF BULL RIVER TOE OF LAZARETTO CRK/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 5.16 MANAGER: G. ROSS

SAVANNAH TIP f 93-H-3 CONG"DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL_HIGHWAY_ADM~N FUNDS

PE 1995 ROW CONST

$ 602 AFTER 96 AFTER 96

CHATHAM 522610

SR-25/US-17 OVER THE SAVANNAH RIVER REPLACEMENT OF THE EXISTING BRIDGES (S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:.

SAVANNAH TIP f.90-H-6 CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM F~QERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW C9NST

$ 150 AFTER 96 AFTER 96

CHATHAM 522670

RE-ROUTING SR 25/US 17 IN PORT WENTWORTH TO SR 30 RECONSTRUCTION & WIDENING, NO LANE ADDITION PROPOSED. PROJECT MILEAGE : ,94 MANAGER:

SAVANNAH TIP t 92-H-5
CON.G DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW CONST

$ , 15
AFTER 96 AFTER 96

CHATHAM 52Y770

SR 26 FM BRYANWOOD RD TO BULL RIV (SHOWN FOR BIKE FUNDS 33B) BICYCLE/PED. FACILITY/ RECST. OR REHAB. PROJECT MILEAGE: 1.94 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: G. BOULINEAU

CHATHAM 531260

SR 204 EB FM MP 2.0-3.2;WB MP 3.7-4.7 SE OF MELDRIM ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.20 MANAGER: PETE BLOCKER

SAVANNAH TIP f. 87-H-34 CONG DIST. 1
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS 521770 IS AN ASSOCIATED PROJECT.
SAVANNAH TIP f 92-H-7 CONG DIST. 1 .
FUND SOURCE: SURFACE TRANSPORT. FEDERAL..HIGHWAY ADMIN FUNDS

PE NONE ROW 1996 CONST

$

0

$

0

AFTER_ 96

PE 1992 UNDERWAY

ROW 1995 $

14

CONST 1996

$

660

FED SHARE $

528

GA. SHARE $ 132

0TH SHARE $

,.,,,,

. . ,

~

s.9

~

~ ~
'

~

~

JtfJ~

~

~

it:@.(:~s

~~.,

~~

,(t.''"'.'\:-!.

r,':,'.'7;~

,~~:~

.. ~. ~~

r::~:-.~~

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 53.

COUNTY

DESCRIPTION

FISCAL

COST

C-HP-A-. T-IH.-NA-MO--. -S-R--2-0-4-/A--B-E-R-C-O-R-NP-R-OS-T-JE-.C-T@--DE-IA-S-THA-E-N-H-O-W--ER---IN---SA-V-A-N-N-A-H----------------------SA-V-A-N--N-AC-HO-M-TM-IE-PN-T-Sf--9-4--R----5-------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--O

532510 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 1

ROW 1994 $ 300

PROJECT MILEAGE : .00 - EXIST. LANES: 7 /PROPOSED LANES: 8

CONST 1995 $ 133

MANAGER: PETE BLOCKER-

FUND SOURCE: RWY. SAFETY

FED SHARE$ 120

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

13

0TH SHARE$

CHATHAM 541900

SR 25 ALT/US 17@ GRAHAM ST IN SAVANNAH INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .40 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: PETE BLOCKER

SAVANNAH TIP f 93-H-1 CONG DIST. 11
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1994 $ 350

FED SHARE$ 315

GA. SHARE$

35

0TH SHARE$

CHATHAM 550460

STEPHENSON AVE/SAVANNAH FM ABERCORN ST TO WATERS AVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .85 MANAGER: BILL MOSKAL (C)

SAVANNAH TIP f 89-H-5 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL
ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

2181 1745
436

CHATHAM DIAMOND CSWY FM FERGUSON AVE TO MCWHORTER DR 550550 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

'.

PROJECT MILEAGE : 3.20

MANAGER: G. ROSS

SAVANNAH TIP f 92-H-3 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 1810 AFTER 96

CHATHAM 550560

WHITFIELD AVE FM OLD WHITFIELD RD TO FERGUSON AVE/ SAVANNAH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: G. ROSS

SAVANNAH TIP f 87-R-39 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

CHATHAM 570830

SURVEILLANCE AND MONITORING SYSTEM IN SAVANNAH CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. PROJECT MILEAGE : .00 MANAGER:

CHATHAM 570850

MCQUEENS ISLAND ABANDONED RAILROAD MULTIPURPOSE TRAIL BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KEITH GOLDEN

SAVANNAH TIP f 94-H-6 CONG DIST. 11
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
SAVANNAH TIP f 94-H-8 CONG DIST. 1 & 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1995

$

578

FED SHARE $ 520

GA. SHARE $

58

0TH SHARE $

PE LOCL

ROW LOCL

CONST 1995

$

440

FED SHARE$ 352

GA. SHARE$

0TH SHARE$

88

GEORGIA.DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 54

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-H-A-T-H-A-M---E-X--T-. -O-F--R-.--M-C-C-O-R-K-L-E--S-R--B-I-K-E-W-A-Y--O-N--W--IL-M--IN-G-T-O-N---IS-L-A-N-D----------------SA-V-A-N-N-A-H---T-I-P--f--9-4--H----9-------------------P-E--L-O-C-L-----------

570860 BICYCLE/PED. FACILITY/ ENHANCEMENT

CONG DIST. 11

ROW LOCL

PROJECT MILEAGE : . 00 - EXIST. LANES: .0 /PROPOSED LANES: 0

CONST 1996

$

110

MANAGER: KEITH GOLDEN

FUND SOURCE: TRANS. ENHANCE.

FED SHARE$

88

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

22

CHATHAM 570870

LANDSCAPING & RAILROAD YARDS & SHOPS/VISITOR CENTER REHAB MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - ,EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: KEITH GOLDEN

SAVANNAH TIP f 94-H~7 CONG DIST. 1 & 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL
ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

2450 1960
490

CHATHAM 570880

OLYMPIC LANDSCAPING IN SAVANNAH, 1994 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW LOCL

CONST 1994

$

625

FED SHARE$ 500

GA. SHARE$ 125

0TH SHARE$

CHATHAM 570890

OLYMPIC LANDSCAPING IN SAVANNAH, 1995 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

<.

CHATHAM 570900

OLYMPIC LANDSCAPING IN SAVANNAH, 1996

LANDSCAPING/ ENHANCEMENT
PROJECT MILEAGE : :oo - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

'

SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 $ ROW LOCL
CONST 1995 $ FED SHARE$ GA. SHARE$
0TH SHARE$

25
1094 875 219

PE 1996 $ ROWLOCL
CONST 1996 $ FED SHARE$ GA. SHARE $
0TH SHARE$

25
1094 875 219

CHATHAM 570910

BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 5/SEE 57Y910
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : 00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

O

ROW NONE' $

0

CONST 1994 $ 392

FED S~ARE $ 353

GA. SHARE$

39

0TH SHARE$

CHATHAM 570960

BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT f5/GLYNN BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 .- EXIST. LANES: 0 /PROPOSED LANES: 0. MANAGER: UNKNOWN .

CONG DIST. 1
FUND. SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROWNONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE $ ..

0 - O
1206 965 241

. ,

&

~

. li!IM ,,~

~

~

,ffiM

8kJi~~j

ftfiU.t,:,

~~.OE~

~l'.:JL~


~:.~:f.i,l

~

(iC?~~

f!!;~~..z~

ti:'i' ;:~ti

..'~~;; ,

.,.'~-

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

CHATHAM 57Y910

BRIDGE PAINT.ING PROJECT FOR FY 1994 - DISTRICT 5/SEE 570910
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 55

FISCAL YEAR

COST ESTS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

336

FED SHARE$

269

GA. SHARE$

67

0TH SHARE$

CHATHAM 81103X

CALL BOXES ON I-16 FROM SR 87/BIBB TO I-95/CHATHAM .. SEE BIBB
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 1 & 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

('

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 56

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA.

---------------------------------------

--------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE

3B1203 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 2

FUNDS RECIPIENT: CHATTAHOOCHEE

OPERATING 1994 $

40

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

22

GA. SHARE$

0TH SHARE$

18

CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE 3Bl204 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHATTAHOOCHEE MANAGER: STEVE KISH

t

CONG DIST. 2

OPERATING 1995 $

41

FUND SOURCE: RURAL TRANSIT

FED SHARE$

23

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

18

CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1205 TRANSIT FACILITIES/ OPERATIONS
FUNDS. RECIPIENT: CHATTAHOOCHEE MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1996 $

43

FUND SOURCE: RURAL TRANSIT

FED SHARE$

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

19

CHATTAHO ONE CONV. VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS 3C2203 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHATTAHOOCHEE COUNTY MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1994

$

54

FUND SOURCE: RpRAL TRANSIT

FED SHARE$

43

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

0TH SHARE$

5

CHATTAHO SR 1@ HICHITEE CREEK 321580 . REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .30 MANAGER: M. REYNOLDS (C)

CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322160 IS AN ASSOCIATED PROJECT.

PE 1990 UNDERWAY

ROW NONE $

0

CONST 1996 $ 865

FED SHARE$

692

GA. SHARE$ 173

0TH SHARE$

.,

..

. ,

1

ffiM

. PiM8 ,,~ ~ l ~ ~ Mn!ill@ !~(~;," I&~ ~ !*-'ki:',~:li lo/2"~";~

--::

;-::::~"-({-.:~:

~

-. ~-~

):-



COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT.OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

16-Sep-1993 Page 57

FISCAL YEAR

COST ESTS

CHATTOOG US 27@ ARMUCHEE & LITTLE ARMUCHEE CRKS/SEE FLOYD CO 62107Z UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .06 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RAY METTS

PE NONE $

0

CONG DIST. 7

ROW NONE $

0

GRIP PROJECT

CONST 1994 $

0

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

621075 IS AN ASSOCIATED PROJECT.

0TH SHARE$

CHATTOOG SR 48 W/SUMMERVILLE EB/WB/TL MP 9.96-10.86;WB 11.7-12.05
621330 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.25 MANAGER: BILL MCVEY

CO~G DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

593

FED SHARE$ 474

GA. SHARE$

119

0TH SHARE$

CHATTOOG CR 1 NE OF TRION@ CHAPPEL CRK 670720 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .13 MANAGER: BILL MCVEY

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$

180

FED SHARE$

144

GA. SHARE$

36

0TH SHARE$

CHATTOOG CR 170/PENN BRIDGE RD OVER CHATTOOGA RIVER SE OF TRION 670750 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .15 MANAGER: BILL MCVEY

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 1079

FED SHARE$

863

GA. SHARE$ 216

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 58

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

-------------------------------.--------

----------------

------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE

6Bl338 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 9 & 6

FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH

f_

OPERATING 1994 $

83

FUND SOURCE: RURAL TRANSIT

FED SHARE$

49

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

34

CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6Bl339 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH

CONG DIST. 9 & 6

OPERATING 1995 $

87

FUND SOURCE: RURAL TRANSIT

FED SHARE$

51

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

36

CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6Bl340 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH

CONG DIST. 9 & 6

OPERATING 1996 .$

90

FUND SOURCE: RURAL TRANSIT

FED SHARE$

53

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

37

CHEROKEE ONE CONVERSION VAN AND ONE MINIBUS 6C2338 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH

CONG DIST. 9 & 6

CAPITAL 1994

$

71

FUND SOURCE: RURAL TRANSIT

FED SHARE$

57

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

7

0TH SHARE$

7

CHEROKEE TWO CONVERSION VANS 6C2339 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE
MANAGER: STEVE KISH

CONG DIST. 9 & 6
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1995

$

57

FED SHARE$

46

GA. SHARE$

5

0TH SHARE$

6

CHEROKEE ONE MINIBUS 6C2340 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH

CONG DIST. 9 & 6

CAPITAL 1996

$

42

FUND SOURCE: RURAL TRANSIT

FED SHARE$

34

FEDERAL TRANSIT ADMIN FUNDS

- GA. SHARE $

4

0TH SHARE$

4

CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl013 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY
MANAGER: STEVE KISH

CONG DIST. 9 & 6

CAPITAL 1994

$

16

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

f.

. .,

,.

gm

l!!!!!!!!J

~
,,

~

~

~

~

~'~~8

e~n

t:lf!..b,


~e-~

v..........;.~

r.::~::;:~:.)1

11,,K.~1

it . :.;~

.r: ..~ '

,. 'i
.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 59

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

-----------

CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

COMMENTS

YEAR

EST$

--------------------------------.-------------------------

6V1014 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 9 & 6

FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY

CAPITAL 1995

$

16

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: CHEROKEE COUNTY MANAGER: STEVE KISH

CONG DIST. 9 & 6

CAPITAL 1996

$

16

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

CHEROKEE I-75@ SR 92

610740 INTERCHANGE/ RECST. OR REHAB.

I

PROJECT MILEAGE : .45 - EXIST. LANES: 4 /PROPOSED LANES: 6

MANAGER: RAY METTS (M)

ATLANTA TIP I CH/R 108
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CON::r

UNDERWAY AFTER 96 AFTER 96

CHEROKEE I-575 SB ON RAMP FROM CR 416/TOWNE LAKE PARKWAY 610970 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CHEROKEE SR 92 FM WOODSTOCK RD TO CHEROKEE TRAIL 620920 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.75 MANAGER: RAY METTS (M)

ATLANTA TIP I CH 24
CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CH 3 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1996 $ 121

FED SHARE$ 109

GA. SHARE$

12

0TH SHARE$

PE 1996 ROW CONST

$

150

AFTER 96:

AFTER 96

CHEROKEE SR 92 FM I-75 TO WOODSTOCK RD 620940 RECONSTRUCTION & WIDENING.FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.59 MANAGER: RAY METTS (M)

ATLANTA TIP I CH 4
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW
CONST

$

150

AFTER 96

AFTER 96

CHEROKEE SR 92 FM E OF SR 754 TO OLD MOUNTAIN PARK RD/COBB 621200 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.10 MANAGER: RAY METTS

ATLANTA TIP f CH 20 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY .I\DMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$ 7192

CONST 1996 $ 8975

FED SHARE $ 7180

GA. SHARE $ 1778

0TH SHARE $

17

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 60

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P. I.NO.

PROJECT DATA

-- CHEROKEE SR 140 REL FM CR 311 NW TO CR 375;THEN NEW LOC TO CR 765

621240 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 3.30

MANAGER: RAY METTS _(M)

FISCAL

COST

-------AC--TOL-NA-GN---TDA-CIO-SM-TT-MI. P-E-6N-f.T-S-CH---.5---------------------RO-PW-EY-E-A1-R9-9-2-----AU-NEF-TDS-TEER-RSW--A9Y6

CONST

AFTER 96

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

CHEROKEE SR 92 FM CHEROKEE TRAIL TO CANTON HWY/SR 754 621390 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10
MANAGER: N. PASSMORE (M)

ATLANTA TIP f CH 9 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY
$ 3712 AFTER 96

CHEROKEE CANTON HWY FM PALM RD/CR 351 TON/SIXES RD [INCL RR BR) 630673 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
PROJECT MILEAGE: .37 MANAGER: .BILL MCVEY
CHEROKEE SR 140 FM SR 5 BUS TO LOWER BURRIS RD NORTH OF CANTON 630942 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.22 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f CH2 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 63Y673 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CH .7
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY ROW LOCL CONST 1996 $ 500
FED SHARE$ 400 GA. SHARE$ 100 0TH SHARE$

PE 1992 ROW_
CONST

UNDERWAY
AFTER 96 AFTER :96

CHEROKEE CR 770/BELLS FERRY RD FM CR 421 TO CR 1012 630945 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.00 MANAGER: H. ASHMORE
r.
CHEROKEE CR 770/BELLS FERRY RD NEW PARALLEL BR@ LITTLE RIVER 630975 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .21 MANAGER: H. ASHMORE
CHEROKEE CR 770/BELLS FERRY RD FM CR 1012 TON OF N/VICTORIA RD 630977 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.90 MANAGER: H. ASHMORE(M)

ATLANTA TIP t CH 1
CONG DIST. 6 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I.CH 18 CONG DIST. 6 -
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t CH .10
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW LOCL

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

o
2182 1746
186 250

-
PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 5526 FED SHARE$ 4421 .
GA. SHARE$ 1105 0TH SHARE$

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

,.

. ,



~

-= ~

~ ~


~

~'~~

~

ttt:.;~,lii;~

~=~:.:::et1


~'ili!ltl

tx~-~~

~': .. ::

tr~-~

I': ::,~

.. ~~ .,

. ;~;...... ~~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 61

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-PH-E-. RI-.O-NK-O-EE-. -S-R--5-B--/S-R--1-4-0--F-MP-R-O5---JLE-NC-T--SD-O-A-TFA--H-I--SC-H-O--O-L--N--T-O-E---O-F--H-O-S-P-IT-A--L--D-R---------A-T-LA--N-T-AC-O-MT-MI-PE-N-fT-S-C-H--1-6---------------------P-EY-E-A1-R9-9-2-----U-EN-DS-TER-SW--AY

631000 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 9

ROW 1991

UNDERWAY

PROJECT MILEAGE : 1.15

CONST 1994

$ 1839

MANAGER: K FULBRIGHT

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 1471

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

368

0TH SHARE $

CHEROKEE CR 1061/CANTON HWY FM END OF MULTI-LN N/I-575 TO SR,20 631130 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.77
MANAGER: M GANNAWAY (M)

ATLANTA TIP f CH 6 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992
ROW LOCL CONST

UNDERWAY AFTER 96

CHEROKEE SR 5 BUS FROM HOSPITAL DR/CS 657 NE TO I-575/SR 5 631150 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.21 MANAGER: K FULBRIGHT (M)

ATLANTA TIP f CH 8 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

CHEROKEE CR 772/KELLOG CREEK RO @ KELLOG CREEK 631215 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .15 MANAGER: H. ASHMORE
CHEROKEE SR 140/CANTON-ROSWELL RD AT CR 297/EARNEY RO & CR 311/MTN RO 631390 INTERSE.CTION IMPROVEMENT / TRAFFIC
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CHEROKEE SHOWN FOR STP FUNDS ONLY ..... SEEP.I. 630673 63Y673 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BILL MCVEY
(_
CHEROKEE SR 20@ SR 372 641701 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .12 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: BILL MCVEY.

ATLANTA TIP f CH 19 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
ATLANTA TIP f CH 25 CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CH 2 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630673 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f CH 15 CONG DIST. 6 & 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 749 FED SHARE$ 599 GA. SHARE$ 150 0TH SHARE$

PE NONE $

0

ROW 1994 $ 275

CONST 1994 $ 418

FED SHARE$

376

GA. SHARE$

42

0TH SHARE$

PE 1994

UNDERWAY

ROW 1985 UNDERWAY

CONST 1996 $ 321

FED SHARE$ 257

GA. SHARE$

64

0TH SHARE$

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

285

FED SHARE$ 257

GA. SHARE$

29

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 62

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

----------------------------------------

------------------------

.--------------C-O-M-M--E-N-TS---------------------------Y--EA-R---------E-S-T-S--

CHEROKEE BELLS FERRY RD FM COBB CO LINE TO PINE RIDGE DR

ATLANTA TIP f CH 13

PE NONE $

0

650370 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 6

ROW LOCL

PROJECT MILEAGE : 1.43

CONST 1994

$ 3401

MANAGER: H. ASHMORE

_FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 2721

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

680

0TH SHARE$

CHEROKEE CR 770/BELLS FERRY RD FM PINE RIDGE DR TO BASCOMB CARMEL RD
650375 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.01 MANAGER: H. ASHMORE

ATLANTA TIP f CH 14 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW LOCL

CONST 1994

$.

FED SHARE$

GA. SHARE$

0TH SHARE$

0
2178 1742
436

CHEROKEE HISTORIC TRAIN DEPOT RESTORATION IN HOLLY SPRINGS 670840 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

ATLANTA TIP f CH 22 CONG DIST. 6 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996

$

175

FED SHARE$

140

GA. SHARE $ '

0TH SHARE$

35

CHEROKEE HISTORIC DEPOT RESTORATION IN WOODSTOCK & SIDEWALKS 670850 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ATLANTA TIP f CH 23 CONG DIST. 6 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONSTl995

$

125

FED SHARE$

100

GA. SHARE$

0TH SHARE$

25

CHEROKEE SR 140 FM RANCHETTE RD TO CR 311:BR@ LITTLE RVR/SEE FULTON
72130X UNKNOWN/ UNKNOWN. PROJECT MILEAGE : .05 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: RAY METTS

ATLANTA TIP t FN 13 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721305 IS AN ASSOCIATED PROJECT.

PE 1991 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

CHEROKEE SR 140/HOUZE RD@ LITTLE RIVER@ CHEROKEE CO LINE 72130Z REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: RAY METTS

ATLANTA"TIP t FN 13
CONG DIST. 6
. FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721308 IS AN ASSOCIATED PROJECT .

PE 1991 ROW LOCL CONST

UNDERWAY AFTER 96

., ,.

'

., ,

'...-:o.

~

~

~ ~


~.3

~

~ ..:J.,,.t/' ,;;.:...i:,

~g:~~

==..;:;;::,

c~y,?:1


pJi:i!!.il

:~~.~~

h~!~~

r;~to-t:~1

ii-:;:)

~
.

..,, ~ \ _, ._. I

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 63

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O-.----------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-ST--S--
CLARKE MULTI-MODAL TRANSP. CTR, VEHICLES, CAP. MAINT., REPAIRS, ETC

101010 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 10

FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM

CAPITAL 1994

$ 1707

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$ 1366

, '

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

171

0TH SHARE$

171

CLARKE 101011

VEHICLES, CAP. MAINT., REPAIRS, SIGNS, POLES, SHELTERS, ETC.
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1995

$ 357

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$ 286

FEDERAL TRANSIT,ADMIN FUNDS

GA. SHARE$

36

0TH SHARE$

36

CLARKE 101012

VEHICLES, CAP. MAINT., SHELTERS, BUS SIGNS, POLES, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1996

$ 425

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

340

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

43

0TH SHARE$

43

CLARKE ADA EQUIPMENT FOR BUSES - PUBLIC ADDRESS, PHONE, VOICE SYST.

101013 TRANSIT PROJECTS/ CAPITAL

.

CONG DIST. 10

FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM

CAPITAL 1994

$

58

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

52

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

CLARKE 101014

ADA EQUIPMENT FOR BUSES - VOICE ANNUNCIATION SYSTEMS
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1995

$

11

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

10

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

CLARKE 101016

PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE-KISH

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $ FED SHARE$
GA. SHARE$ 0TH SHARE$

1050 525
525

CLARKE 101017

PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

1100 550
550

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

CLARKE 101018

PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIEN.T: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST .. 10
FUND SOURCE: URBAN TRANSIT F~DERAL TRANSIT ADMIN FUNDS

16-Sep-1993 Page 64

FISCAL YEAR

COST ESTS

.---------------- ----------

OPERATING 1996 $ . , FED- SHARE $
GA. SHARE$ 0TH SHARE$

1300 364 1 937

CLARKE 1Vl010

ELDERLY AND DISABLED'VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1994

$

15

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

12

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

CLARKE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

(

lVlOll TRANSIT PROJECTS/ CAPITAL

CONG DIST. 10

FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA

CAPITAL 1995,

$

15

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

12

(.

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

CLARKE 1Vl012

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1996

$

16

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

CLARKE 121970

CR 600/DANIELSVILLE RD FM 4-LN NEAR CR 109 TO CR 107/HULL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .43 MANAGER: L. OWENS

ATHENS TIP f II-01-2 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

CLARKE 121990

PRINCE AVE FM S/SR 8 TO 600' N/CSX RR BR ON JEFFERSON ST INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE: .50 - EXIST. LANES: 4 /PROPOSED LANES: 8
MANAGER: L. OWENS

CLARKE 122160

SR 15 ALT/US 129 FM LAVENDER DR IN CLARKE CTY TO SR 330 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.71 MANAGER: RON BRAZIEL (M)

ATHENS TIP f II-01 CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122350 IS AN ASSOCIATED PROJECT.

ATHENS TIP f II-02-2

CONG DIST. 19

.

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1994

$. 2197

FED SHARE $ 1758

GA. SHARE $

439

0TH SHARE $

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

.. ....

' _;;

,. "'

., ..

. '

'P

--

MM

M!8

~


== { ~

~

~L~

~~

lfth11i

~:r;.11:"tij


~:.~

.Wi~~

(.!::;~;~1

,~!t'!

i:i:.::":U

~:f:.-:'.~


.i:.-;.v.....:~\~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 65

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-PL-A-. R-I.K-NE-O--. -S-R--1-5-/-P-R-I-N-C-E--A-P-VR-EO-/N-JE-CA-T-TH-D-ENA-ST-A--B-Y-P-@---C-SX---R-R----------------------------A-T-H-E-N-S-C-OT-MI-PM-E-fN-T-SI-I--0-2-----------------------P-EY-E-A1-R9-9-2-----U-NE-DS-ETR-SW--AY

122350 REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 6 LANES.

CONG DIST. 10

ROW NONE

$

0

PROJECT MILEAGE : .10

CONST 1994

$

350

MANAGER: L. OWENS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE. $ 280

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

70

121990 IS AN ASSOCIATED PROJECT.

0TH SHARE $

CLARKE 12257Z

SR 10/US 78 MONROE TO ATHENS, MEDIAN OPENINGS; SEE WALTON
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

0

ROW NONE $

0

CONST 1994

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

CLARKE 122600

SR !OLP/ATHENS BYPASS NB ON & OFF RAMPS TO WINTERVILLE RD
RAMP/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 2 MANAGER: L. OWENS (M)

ATHENS TIP f III-OS CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW 1996 CONST

$

10

$

10

AFTER 96

CLARKE 122680

SR 8/US 78@ HUNTINGTON RD AND ATHENS BYPASS

r

INTERSECTION IMPROVEMENT/ TRAFFIC

PROJECT MILEAGE : ,53 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. OWENS

CLARKE 13234Z

SR 10 FM ALCOVY RIVER/WALTON THRU OCONEE TO SR 8/CLARKE GUARDRAIL/ TRAFFIC PROJECT MILEAGE : 10.10 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CLARKE 15021X

EPPS BRIDGE RD@ MCNUTT CREEK ... SEE OCONEE UNKNOWN/ UNKNOWN PROJECT MILEAGE : ,00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: UNKNOWN

CLARKE 15021Y

CR 473/EPPS BR RD FM SR 10/0CONEE TO US 78 ... SEE OCONEE UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1994

$

150

CONST 1994

$

450

FED SHARE $

405

GA. SHARE $

45

0TH SHARE $

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

ATHENS TIP f II-03

PE NONE $

0

CONG DIST. 10

ROW LOCL

CONST 1995 $

0

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

150215 IS AN ASSOCIATED PROJECT.

0TH SHARE$

ATHENS TIP f II-03

PE NONE $

0

CONG DIST. 10

ROW LOCL

. CONST 1995

$

0

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

FEDERAL.HIGHWAY ADMIN FUNDS

GA. SHARE$

150210 IS AN ASSOCIATED PROJECT.

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 66

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-JL-.A->R-,IK-,NE-O--. -T--R-A-IL-S--A-L-O-N-G--O-PC-RO-O-N-EJE-EC-T-R-IV-D-A. -TA-IN---U-G-A--E-.--C-A-M-P-U-S---E-X-P-A-N-S-IO--N--A-R-E-A----------A-T-H-E-N-S-C-OT-MI-PM-E-IN-T-VS---0-2-----------------------P-EY-E-AL-OR-C-L------E-S-T-S--

-170920 BICYCLE/PED. FACILITY/ ENHANCEMENT

CONG DIST. 10

ROW LOCL

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

886

MANAGER: UNKNOWN

FUND SOURCE: TRANS, ENHANCE.

FED SHARE$

709

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$

0TH SHARE$

177

CLARKE 170925

BIKEWAY/LANDSCAPING ON EPPS BRIDGE ROAD IN ATHENS BICYCLE/PED. FACILITY/ ENHANCEMENT . PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: H. ASHMORE

ATHENS TIP I V-01
CONG DIST, 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1995 $ 675

FED SHARE$

540

GA. SHARE$

0TH SHARE$

135

CLARKE 170960

LUMPKIN ST/ BAXTER ST SIGNAL SYSTEM IN ATHENS SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

CLARKE 170970

ATHENS CBD SIGNAL SYSTEM
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

ATHENS TIP I III~02
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATHENS TIP f III-04 CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

95

FED SHARE$

86

GA. SHARE$

10

0TH SHARE$

'

PE NONE $

0

ROW NONE .$

0

CONST 1996 $ 220

FED SHARE$

198

GA. SHARE$

22

0TH SHARE$

cLARKE 170980

REALIGNMENT OF RIVERBEND RD FM MILLEDGE AV TO COLLEGE STA RD
MINOR WIDEN & RESURF / TRAFFIC PROJECT MILEAGE : 1.40 ~EXIST.LANES: 2 /PROPOSED LANES: 2
MANAGER: L. OWENS

ATHENS TiP f III-01 CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1994 $ 130

FED SHARE$

117

GA. SHARE$

13

0TH SHARE$

CLARKE 171015

BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT fl BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

(_

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 517

FED SHARE$

414

GA. SHARE$ 103

0TH SHARE$

...
t

..

I 0

'V5-

9IIJl!!!I

~ ffl!!!!!1 I!!!!!! 91!!.!
~

~

~

t~~1'J

~

~.:;hi@'

a::..,:;:,~
'

t!t:!'.!:~2

/ffe,~

~;~~:>.~

r~,XJ'..!l

';.'..!C:<.'.;i

~~]

t:;

.

...; ..

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 67.

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLAY

COUNTY OPERATED PUBLIC TRANSIT SERVICE

4B1263 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 2

FUNDS RECIPIENT: CLAY

OPERATING 1994

$

51

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

31

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

20

CLAY 4B1264

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH

CLAY 4B1265

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1995 $

53

FUND SOURCE: RURAL TRANSIT

FED SHARE$

32

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

21

(

CONG DIST. 2

OPERATING 1996 $

55

FUND SOURCE: RURAL TRANSIT

FED SHARE$

33

FEDERAL TRANSIT ADMIN FUNDS

.GA. SHARE $

0TH SHARE$

22

CLAY 4C2263

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

CLAY 4C2264

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1995

$

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

3

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

16-Sep-1993 Page 68

FISCAL YEAR

COST ESTS

CLAYTON 7Vl010

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH

CONG DIST. 3

CAPITAL 1994

$

26

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

21

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

3

CLAYTON 7Vl011

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH

CONG DIST. 3

CAPITAL 1995

$

27

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

22

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

2

0TH SHARE$

3

CLAYTON 7Vl012

ELDERLY AND DISABLED-VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH

CONG DIST. 3 .

CAPITAL 1996

$

28

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

22

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

CLAYTON 31097X

I-75 FM I-675 TO SR 7/US 41/HENRY (NOISE BARR. & LIGHTING) WALLS/ RECST. OR REHAB. PROJECT MILEAGE : 7.80 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: J. GRAYBEAL
(

ATLANTA TIP f CL-R 12 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 310976 IS AN ASSOCIATED PROJECT.

PE 1996 ROW NONE CONST

$

0

$

0

AFTER 96

CLAYTON 32205X

SR 42 FM SR 138/HENRY TO I-675 NB RAMPS .. SEE HENRY CO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: H. REYNOLDS

ATLANTA TIP f CL64/HE5 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 322050 IS AN ASSOCIATED PROJECT.

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

CLAYTON 712420

1-75 FM US 41/0LD DIXIE HWY TO I-285/INCL BR & FNTGE RDS RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.
PROJECT MILEAGE : 5.90 MANA;ER: J. GRAYBEAL

ATLANTA TIP t CL-R.11
CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1988 UNDERWAY

ROW 1991 UNDERWAY

(. CONST 1994

$ 17499,

FED SHARE $ 13999

GA. SHARE $ 3500

0TH SHARE $

CLAYTON 712425

1-75 FM SR 3/US 41/0LD DIXIE HWY TO I-285 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 2.90 MANAGER: J. GRAYBEAL (M)

ATLANTA TIP f.CL-R 11 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
I>

PE 1996 ROW CONST

$ 1000 AFTER 96 AFTER 96

,. ,.

..

't.

;{1111

~

.. -.. ~ ~

l!!!!!l!!I!'!

~

~

~

~

~

.l!l,!!,!.t~,!'ll

~.

l'!;~l':;.:i

F~~

-!-~t7"'.-~

~

.. ., ~

],;-:-- ....

'

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 69

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLAYTON I-285@ CONLEY ROAD

ATLANTA TIP f CL 4

PE 1988 UNDERWAY

712430 BRIDGES/ RECST, OR REHAB.

CONG DIST. 3

ROW LOCL

PROJECT MILEAGE :' .10

CONST

AFTER 96

MANAGER: G, ROSS

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 712602

LEE STREET IN MORROW OVER I-75
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : ,08 MANAGER: J. GRAYBEAL(CM)

ATLANTA TIP f CL 59 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

CLAYTON 712630

I-75/MORROW@ SR 54 (INCL RR BRIDGE OVER I-75) INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .23 - EXIST. LANES: 4 /PROPOSED LANES: 8 MANAGER: J. GRAYBEAL(CM)

CLAYTON 712970

HOV LN SIGNING ON I-75 & I-85 METRO/FUL;COBB;GWIN
HOV LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

CLAYTON 713050

I-675, I-75, I-20: IMPACT ATTENUATORS&BARRIER WALL AT BR. IMPACT ATTENTUATORS / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CLAYTON 713090

I-85 NB 62 SIGNS FROM I-285 TO SR 166 LAKEWOOD FWY .. FULTON

SIGNING/ MAINTENANCE

PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

r..

CLAYTON 713110

I-75, VAR LOC FROM I-285 SOUTH TO BARRETT PKWY .. FUL-COBB
PVMNT MARKINGS/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK

ATLANTA TIP f CL-R 31 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

ATLANTA TIP i R 73
CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

ATLANTA TIP t R 130
CONG DIST. 3 & 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS

ATLANTA TIP f R 130 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS 71309Z IS AN ASSOCIATED PROJECT.

ATLANTA TIP t R 130

CONG DIST. 5

..

FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71311X IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 6221

FED SHARE$ 6221

GA. SHARE$

0TH SHARE$

PE 1994

UNDERWAY

ROW NONE $

0

CONST 1994 $ 1000

FED SHARE$ 1000

GA. SHARE$

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 223

FED SHARE$ 223

GA. SHARE$

0TH SHARE$

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 615 615

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 70

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P-.I-.-N-O--.----------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLAYTON I-75 FM US 41/0LD DIXIE HWY TO I-285; TO SHOW IM FUNDS

ATLANTA TIP f CL-Rll

PE NONE $

0

71Y420

RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.

PROJECT MILEAGE 5,90

MANAGER:

.

CONG DIST. 3 FUND SOURCE: I-STATE HAINT.

ROW NONE $

CONST 1994

$

FED SHARE$

0
6501 5851

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

650

0TH SHARE$

CLAYTON 720815

SR 42 FM LAKE HARBIN RD N TO ANVIL BLOCK RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.52 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f, CL 12 CONG DIST. 3
F~ND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 731090 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1996.
CONST

UNDERWAY

$

975

AFTER 96

CLAYTON 720817

SR 42/HACON HWY@ UPTON CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .OO MANAGER: M. REYNOLDS .(M)

ATLANTA TIP f CL 79 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1996

$

155

FED SHARE $

124

GA. SHARE $

31

0TH SHARE $

'CLAYTON 721040

SR 54 (& FAYETTE CO) @ MORNING & CAMP CRKS; & FLINT RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .70 MANAGER: D. GODWIN

ATLANTA TIP f CL23/FY2

CONG DIST. 3 ,

.

FUND SOURCE: BRIDGE PROGRAM
FEDERA.L HIGHWAY ADMIN FUND. S

PE 1986 UNDERWAY

ROW 1994

$

552

CONST 1995 $ 3246

FED SHARE $ 2597

GA. SHARE $

649

0TH SHARE $

CLAYTON 721270

SR 42/HACON HWY FM S/ANVILBLOCK RD TO OLD TONY RD/DEKALB RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.30 MANAGER: M, REYNOLDS

ATLANTA TIP f CL10/DK8
CONG DIST. 3 & 11
FUND SOURCE: SURFACE T~SPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1992 UNDERWAY

CONST 1996

$ 4235

FED SHARE $ 3388

GA. SHARE $

847

0TH SHARE $

CLAYTON 721290

SR 85 FM SR 279/FAYETTE N TO 6-LN@ ROBERTS DR/CLAYTON RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE: 4.10 MANAGER: K FULBRIGHT (M)

ATLANTA TIP f CL15/FY4

CONG DIST. 3

.

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 1600 AFTER 96

CLAYTON 721295

SR 85 NBL@ CAMP CREEK@ FAYETTE CO LINE

REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 6 LANES.

PROJECT MILEAGE : .03

'

MANAGER: K FULBRIGHT (M)

ATLANTA TIP f CL 77 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1996

$

294

FED SHARE $

235

GA. SHARE $

59

0TH SHARE $

.

! r\ll

(O

,,

.... ~,p

~

1!!!!!!!!!!111

. -~ ~

II,

., ... }

"@R

~

= ~

~

~ .i!L~ ~ ~

--,

"'

~

b~

l<.'..i.L'..;,"-i

~

. ~~~~~i



1'.~.~H '.~'!

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 71

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I,NO.
C-L-A-Y-T-O-N-

PROJECT DATA
S-R---1-3-8--FM---W-A-L-T--S-TEP-H-E-N--S--R-D--E-AST

TO--I--7-5-/H--E-N-R-Y---CO-------------------A-T-LA-N--TA-C-O-MT-MI-PE-N-fT-S-C-L--3-1---------------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY

721480 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 3

ROW 1996 $ 5180

PROJECT MILEAGE : 3.55

CONST

AFTER 96

MANAGER: RON BRAZIEL (M)

"FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 721550

SR 85 FM ADAMS DR TO RAMP@ I-75/INCL INTCH@ FOREST PKWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 3.10 MANAGER: N. PASSMORE (M)

ATLANTA TIP f CL 14 CONG DIST. 3 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AFTER 96 AFTER 96

CLAYTON 721555

SR 85@ SR 331 & I-75 RAMP INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

CLAYTON 721860

TARA BLVD@ I-75 (GATEWAY PROJECT) LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST.-LANES: 6 /PROPOSED LANES: 6
MANAGER: J. GRAYBEAL (C)

CLAYTON 731050

SR 85 AT SR 138 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GODWIN

CLAYTON 731060

SR 85 AT VALLEY HILL ROAD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: D. GODWIN.

CLAYTON 731070

TARA BLVD AT OLD DIXIE HWY INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GODWIN

ATLANTA TIP f CL 82 CONG DIST. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 122 CONG DIST. 3 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 80 CONG DIST. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 81 CONG DIST, 3 & 5 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 84 CONG DIST. 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1994 $ 904

FED SHARE$ 814

GA. SHARE$

90

0TH SHARE$

PE NONE $

0

ROW NONE $"

0

CONST 1994

$

120

FED SHARE$

96

GA. SHARE $-

36

OTH SHARE$

60

PE NONE $

0

ROW 1994 $

77

CONST 1995 $ 165

FED SHARE$ 149

GA. SHARE $

17

0TH SHARE$

PE 1994 UNDERWAY

ROW 1994

$

33

CONST 1995 $ 243

FED SHARE $ 219

GA. SHARE $

24

0TH SHARE $

PE 1994 UNDERWAY

ROW 1994

$

61

CONST 1994

$

271

FED SHARE $

271

GA. SHARE $

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 72

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

----------------------------------------------------------------------------

----C-OM--M-E-N-TS----------------------------Y-EA--R--------E-S-T-S--

CLAYTON SR 42 AT DOUBLE BRIDGE ROAD

ATLANTA TIP I CL 88

PE NONE $

0

731090 INTERSECTION IMPROVEMENT / TRAFFIC

(

CONG DIST; 3

ROW 1994

$

50

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2

CONST 1994

$

300

MANAGER: D. GODWIN

..

FUND SOURCE: HWY. SAFETY

_ FED SHARE $ 270

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

30

720815 IS AN ASSOCIATED PROJECT.

0TH SHARE$

CLAYTON 731400

SR3/US19&41/TARA BLVD AT CR 537/FREEMAN RD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .31 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP I CL 92 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE- NONE

$

0

ROW NONE $

0

CONST 1994

$

154

FED SHARE$

154

GA. SHARE$

0TH SHARE$

CLAYTON 751730

CR 1342/BATTLE CREEK RD@ JESTERS CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: D. GODWIN

ATLANTA TIP I CL 17 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1991

UNDERWAY

ROW LOCL

CONST 1996

$

409

FED SHARE$ 327

GA. SHARE$

82

0TH SHARE$

CLAYTON 751760

MT ZION RD FM SR 54 SE TO MT ZION BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.45 MANAGER: J. GRAYBEAL (C)

ATLANTA TIP I CL 18 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

10

AFTER ~6

CLAYTON 751770

BATTLECREEK-MT.ZION FM SOUTHLAKE PKWY TO LAKE HARBIN RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.63 MANAGER: J. GRAYBEAL (C)

ATLANTA TIP f CL 19 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$'

10

AFTER 96

CLAYTON 751775

BATTLE CREEK RD FM VALLEY HILL RD TO SOUTHLAKE PKWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.98 MANAGER: D. GODWIN -

ATLANTA TIP I CL 17
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

10

AFTER 96

CLAYTON 751790

PANOLA RD FM BOULDERCREST RD TO STAGECOACH RD RECONSTRUCTION'& WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.10 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f CL16/HE4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

10

AFTER 96

,.
~

' '

~

'

,

,,")
~

!lJ!!l!!!ll

M!!l!!I l!!J!!lll!l!!!I


Si!!!!.WJ
"

~

~

~

~

~

.~Jft.t.~ .,

f:lt!t~~
~ ....

~

(fi~;:,tii

r~:f;i~t..~

k'. :.:,;!l~

..... i;.> .!:::

T'~:'~

;.:, ,.

,\.,,~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 73

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLAYTON ANVILBLOCK RD FM END OF WIDENED SECTION E TOBOULDERCREST RD

ATLANTA TIP f CL .60

PE 1996 $

10

751800 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 3

ROW LOCL

PROJECT MILEAGE : .63

CONST

AFTER 96

MANAGER: D. GODWIN

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 751810

FLINT RIVER RD FM WEBB DR TO TARA BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2.71 MANAGER: D. GODWIN

ATLANTA TIP f CL 20 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

10

AFTER 96

CLAYTON 751850

SR 314/FAYETTE'LE RD FM SR 279 TO NORMAN DR/CR 255 .. FAYETTE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 5.63 MANAGER: M GANNAWAY (M)

1.

CLAYTON 751855

SR 314/FAYETTEVILLE RD FM NORMAN DR/CR 255 TO SR 139 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.53 MANAGER: M GANNAWAY (M)

ATLANTA TIP f CL5/FY8 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 75185X IS AN ASSOCIATED PROJECT.
ATLANTA TIP f CL62/CL5 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$ . 250 AFTER 96
AFTER 96

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

CLAYTON 752060

MORROW RD/CR 1348@ JESTER'S CREEK REPLACEMENT OF .THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .20 MANAGER: D. GODWIN

CLAYTON 752180

CONLEY RD FM OLD DIXIE HWY/SR 3 TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.70 MANAGER: G. ROSS

ATLANTA TIP f CL 78 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 74 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 196

FED SHARE$

157

GA. SHARE$

39

0TH SHARE$

PE 1995 ROW LOCL CONST

$

51

AFTER 96

CLAYTON 752240

FOREST PARKWAY@ GERMAIN INDUSTRIAL BLVD WEST OF SR 42 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .45 - EXIST. LANES: 2 /PROPOSED LANES:. 2
MANAGER: D. GODWIN

ATLANTA TIP f CL 86 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW LOCL

CONST 1995 $ 295

FED SHARE$ 266

GA. SHARE$

30

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 74

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL YEAR

COST ESTS

- - CLAYTON JESTERS CK GREENWAY FM JONESBORO TO MORROW

--------A-T-L-A-N--TA---T-IP---f --C-L--8-9 ---------------------P-E--L-O-C-L-----------

770460 BICYCLE/PED. FACILITY/ ENHANCEMENT

CONG DIST.-;3

ROW LOCL

PROJECT MILEAGE : 4.00.- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1995 $ 1734

MANAGER:.UNKNOWN

FUND SOURCE: TRANS. ENHANCE.

FED SHARE$ 1387

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

347

CLAYTON 770500

HISTORIC DEPOT RESTORATION IN JONESBORO MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

ATLANTA TIP f CL 90 CONG DIST .. 3
FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996 $ . 94

FED SHARE$

75

GA . SHARE $

0TH SHARE$

19

CLAYTON 770600

TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN CLAYTON COUNTY r:-
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

ATLANTA TIP f CL 94 CONG DIST. 3
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

50

ROW NONE $

0

CONST 1995 $ 450

FED SHARE$ 360

GA. SHARE$

0TH SHARE$

90

,. .1 .,

...

...

~-"t

I!!!!!!!!!!

1!!11!!!!!!!1

,P-m
'

~ ,,

COUNTY P. I.NO.

~

~

~

DESCRIPTION PROJECT DATA

~

~

= ~

~

r'

e;~:id

~

~.i(.::.:~

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

i: ~r~

..I...::

,~~

16-Sep-1993 Page 75

FISCAL YEAR

COST ESTS

CLINCH 422055

SR 38/US 84@ SUWANNOOCHEE CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: N. PASSMORE (M)

CONG DIST. 8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 422050 IS AN ASSOCIATED PROJECT.

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

CLINCH 431065

SR 187@ SUWANNOOCHEE CRK OFLW S/HOMERVILLE

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES ..

PROJECT MILEAGE : 1.00

(_

MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992. UNDERWAY

ROW 1994

$

1

CONST 1995 $

275

. FED SHARE $

220

GA. SHARE $

55

0TH SHARE $

CLINCH 43106X

SR 187@ SUWANNOOCHEE CRK/SEE ECHOLS COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 431060 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1994

$

0

CONST 1995

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

GEORGIA DEPARTM_ENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 76

PROJECT LISTING BY COUNTY FY 1994/FY 1996

------ COUNTY P, I.NO. COBB

DESCRIPTION

PROJECT DATA

- - ---

-

PERMANENT OPERATIONS/MAINT,

FACILITY

DEVEL-O-P-M--EN-T

--

FISCAL

COST

PHAS-E---I -------------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

7D7014 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 7 & 6

FUNDS RECIPIENT: COBB COUNTY MANAGER: STEVE KISH

CAPITAL 1994

$ 2725

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$ 2180

FEDERAL TRANSIT ADMIN FUNDS

GA, SHARE$ 273

0TH SHARE$

273

COBB 7D7027

PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS./ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

2594 1297
1297

COBB 7D7028

BUS PURCHASES, P & R LOT DEV., TRANSFER FACILITY, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

6157 4926
616 616

COBB 7D7029

TRANSIT COACHES, PARATRANSIT BUSES, AND PLANNING PROJECTS

TRANSIT PROJECTS/ CAPITAL

FUNDS RECIPIENT: COBB COMMUNITY TRANSIT

r.

MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

2736 2189
328 219

COBB 7D7030

TRANSIT COACHES, PARATRANSIT BUSES, AND PLANNING PROJECTS TRANSIT-PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

2736 2189
328 219

COBB 7D7044

PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995

$

896

FED SHARE$

448

GA. SHARE$

0TH SHARE$

448

COBB 7D7045

PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996

$

896

FED SHARE$ 448

GA. SHARE$

0TH SHARE$ 448

,, ,,

'-
... ,,

.,, J

<..,

~

l!!!!I!!! ..,l.l!!!!!!!!!

~

~

~

~

~

~

-= ~ ~'

.. ~ BEi:lt~ ~;,:;,~ t(.ef::: ~:M

"'-

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 77

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

-----------------------------------------

----------------------------------CO-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

COBB

MULTIMODE, SHORT RANGE, FINANCIAL, FACILITIES, ETC. PLANNING

7D7504 SPECIAL STUDIES/ PLANNING

CONG DIST. 6

FUNDS RECIPIENT: COBB COUNTY MANAGER: STEVE KISH

FUND SOURCE: STATE FUNDS

PLANNING 1994

$ 576

FED SHARE$

461

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

57

0TH SHARE$

58

COBB 7V1013

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH

CONG DIST. 7 & 6

CAPITAL 1994

$

65

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

52

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

7

0TH SHARE$

7

COBB 7Vl014

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH

CONG DIST. 7 & 6

CAPITAL 1995

$

67

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

54

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

6

0TH SHARE$

7

COBB 7Vl015

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH

CONG DIST. 7 & 6

CAPITAL 1996

$

70

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

56

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

7

0TH SHARE$

7

COBB 62120X

SR 92 FM E OF SR 754 TO OLD MOUNTAIN PARK RD/CHEROKEE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.95 MANAGER: RAY METTS,

ATLANTA TIP f CH 20 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 621200 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY.

ROW 1995

$

0 ..

CONST 1996 $

0

FED SHARE $

GA. SHARE $

0TH SHARE $

COBB. 712750

WINDY HILL RELIEVER BRIDGE OVER I-75 (PHASE I) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.40 MANAGER: G. ROSS (C)

ATLANTA TIP f C0171 CONG DIST. 6
FUND SOURCE: SURFACE TRAN SP.ORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL
ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
5500 4400 1100

COBB 712752

WINDY HILL RELIEVER FM COBB PKWY TO THE I-75 BRIDGE; PHASE 2 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .70 MANAGER: G. ROSS (C)

ATLANTA TIP f CO 171

CONG DIST. 6

.

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW 1996 CONST

$ 1200 AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 78

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

C-O-B-B------E-A-S-T---W-E-S-T--C-O-N-N---IN-T-C-H---W-/-I--2--8-5--E

RAMPS

&-A--T-LA--N-TA-RD-

COMMENTS

YEAR

ESTS

BRID--G-E-,PH2------A-T-L-A-N-T-A---T-IP---t-c-o---R---7-0-------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

712760 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED.

CONG. DIST. 6.

ROW

AFTER 96

PROJECT MILEAGE : .00

CONST

AFTER 96

MANAGER: G. ROSS (CM)

FUND SOURCE: NAT'L HIGHWAY

FEDERAL. HIGHWAY ADMIN FUNDS

COBB 712800

KENNEDY INTERCHANGE@ I-75 (CONTRACT l);SEE 71Y800 FOR IM INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (C)

COBB 712804

KENNEDY INTERCHANGE I-75 IMPRV & AKERS MILL RELOC (CT 2)& NH
INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .OO - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (CM)

COBB 712890

I-75/SR 401 FM I-285 NORTH TO SR 5 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 8.38 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E. LAWS

COBB 71297Y

HOV LN SGN ON I-75 & I-85 METRO/CLAYTON;FULTON;GWINNETT
HOV LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

COBB 713020

I-20 FM W OF SIX FLAGS DR TOW OF SR 280 / & FULTON SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
r..

COBB 713060

I-285: SHOULDER REPAIR ADJ TO CONCRETE PAVING&FULTON-DEKALB
SHOULDER WORK/ MAINTENANCE PROJECT MILEAGE : 42.56 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: .

ATLANTA TIP f CO-R 78
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 71Y800 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CO-R 78
CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 138 CONG DIST. 6 .
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 73 CONG DIST. 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712970 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f AT-R 154 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71302X IS AN ASSOCIATED PROJECT.
ATLANTA TIP f R 130 CONG DIST. 5 & 4
FUNb SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

17007 13606
471 3872

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA, SHARE$ 0TH SHARE$

39855 35870
3986

PE NONE $ ROW.NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0 3687 2950
737

PE 1994 $

0

ROW NONE $.

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994

$

950

FED SHARE$

950

GA. SHARE $

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994

$

580

FED SHARE$ 522

GA. SHARE$

58

0TH SHARE$

'.1

I !1

)

.....

,,

,, J

t:""'f

~

~

~ . ~ ,,

~

~

~=--=

~

ftifj

t:.~~ ~

r:tr::t:a

~U!~

!!if4K+.1!i

fi,i~~li!i

/i.::: '4ii"

.)~ l,~~-~~ '

~ . -......,,....... .
''
_.

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 79

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

C-O-B-B-------I--2-8-5--W--E-S-T-S-ID-E---52---S-IG-N--S--N-B--FR-O-M--

I-2-0---TO---I--7-5--.-.-. -FU-L-T-O-N--------------A-T-LA--N-T-AC-O-MT-MI-PE-N-IT-SR---1-3-0---------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--

0

71309X UNKNOWN/ UNKNOWN

CONG DIST. 6'

ROW NONE $

0

PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L, SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

713095 IS AN ASSOCIATED PROJECT.

0TH SHARE$

COBB

I-75 VAR LOCA FROM I-285 SOUTH TO BARRETT PKWY .. CLAY-FULTON

ATLANTA TIP IR 130

PE NONE $

0

71311Z PVMNT MARKINGS/ MAINTENANCE

CQNG DIST. 5

ROW NONE $

0

PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

713110 IS AN ASSOCIATED PROJECT.

0TH SHARE$

COBB

0
COMMUNICATION CABLE ON I-85 FM I-75 NORTH TO I-285

ATLANTA TIP IR 168

PE NONE $

0

71314X MISCELLANEOUS IMPROVEMENTS/ TRAFFIC

CONG DIST. 4 & 5

ROW NONE $

0

PROJECT MILEAGE : 10.00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: BURT RIDDLE

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

COBB 71Y800

KENNEDY INTERCHANGE@ I-75 -TO SHOW IM FUNDS; SEE 712800 INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (C)

ATLANTA TIP I CO-R 78 CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712800 IS AN ASSOCIATED PROJECT.

PE LOCL ROW 1994 $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

3500 4866 4379
487

COBB 71Y804

KENNEDY INTERCHANGE@ I-75 - TO SHOW NH FUNDS; SEE 712804 INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10
MANAGER:

ATLANTA TIP I CO-R 78 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$
0TH SHARE$

4000 3200
800

COBB 720125

N'SIDE. PKWY@ CHATTAHOOCHEE RVR INCL APPR/& FULTON CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 6 LANES. PROJECT MILEAGE : 1.01 MANAGER: BEN BUCHAN (M)

(_

COBB 720468

SR 6/US 278@ CSX .RR 2.8 MI W/POWDER SPRINGS
BRIDGES/ REPLACEMENT PROJECT MILEAGE : .35 MANAGER: D. GODWIN

ATLANTA TIP I AT12/C024 CONG DIST, 5 & 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72Yl25 IS AN ASSOCIATED PROJECT.
ATLANTA TIP I CO 225
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72Y468 IS AN ASSOCIATED PROJECT.

PE 1981 UNDERWAY ROW 1985 UNDERWAY CONST 1996 $ 2500
FED SHARE$ 2000 GA. SHARE$ 500 0TH SHARE$

PE 1993 UNDERWAY

ROW 1994 $

25

CONST 1995 $ 885

FED SHARE$ 708

GA. SHARE$ 177

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 80

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

---------------------------------------

--------------- --------------------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

SR 8/US 78 FROM DOUGLAS CO TO SR 5/INCL BR@ SWEETWATER CK

ATLANTA TIP f CO 7

PE 1986

UNDERWAY

721100 RECONSTRUCTION & WIDENING FROM 2 LANES T9 5 LANES.

CONG DIST. 7

ROW 1991 UNDERWAY

PROJECT MILEAGE : 1.60

CONST 1994

$ 4023

MANAGER: D. SMITH

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 3218

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

805

0TH SHARE $

COBB 721110

SR 8 FM W OF SR 139 TO RIVERVIEW RD (INCL SIGNALS"@ 4 INTER) RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 4.40 MANAGER: D. SMITH

ATLANTA TIP f CO 6

CONG DIST. 7

.

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 UNDERWAY

ROW 1989 UNDERWAY

CONST 1994

$ 8851

FED SHARE $ 7081

GA. SHARE $ 1770

0TH SHARE $

COBB 721150

SR 3/US 41/COBB PKWY FM AKERS MILL RD TO SPRING ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. PROJECT MILEAGE : .54 MANAGER: G. ROSS (C)

ATLANTA TIP f CO 80 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERALHIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1994

$ 2070

CONST 1996

$ 2130

FED SHARE $ 1704

GA. SHARE $

326

0TH SHARE $

100

COBB 721152

SR 3/US 41/COBB PKWY FM PACES MILL RD TO AKERS MILL ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. PROJECT MILEAGE: .99 MANAGER: G. ROSS (M)

ATLANTA TIP I CO 231
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AFTER 96 AFTER 96

COBB 721250

SR 3/US 41/COBB PKWY FM SPRING RD N TO TERRELL MILL PHl,3 RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE: 1.69 MANAGER: G. ROSS (H)

ATLANTA TIP f CO 81
CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 1311 AFTER 96

COBB 721252

COBB PARKWAY FM S 120 LOOP TON 120 LOOP (PHASE 2) RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE : .69 MANAGER: G. ROSS (M)

ATLANTA TIP f CO 81 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96.

COBB 721256

COBB PARKWAY FM TERRELL MILL RD TO SOUTH 120 LOOP (PH 4,5) RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE : 3.01 MANAGER:G. ROSS (M)

ATLANTA TIP f CO 81 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

,, f "

.,,

,..

l'

~

~

I!!!!!!,

~

~

~

~

~

~

. C~L:i_!i

li:!z:.n;$

~i:f~-'t

ft:.:~;:.--;~:

1:'..

:"''.,.;. :.....

~A,
.

\-~--,.:-<;-.,,
-.-:,.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 81

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

SR 120/ROSWELL RD FM SR 120 LP TO PIEDMONT RD/MARIETTA

ATLANTA TIP f CO 177

PE 1996

$

80

721310 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

CONG DIST. 6

ROW

AFTER 96

PROJECT MILEAGE : 1.50

CONST

AFTER 96

MANAGER: D. SMITH (M)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

COBB 721670

S.MARS HILL EXT FM OLD US 278/SR6 BUS TO SR 120/DALLAS HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.44 MANAGER: D. SMITH (CM)

ATLANTA TIP f CO 123
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW 1996 CONST

$ 8000 AFTER 96

COBB 721680

SR 176/MARS HILL RD FRM SR 120/DALLAS HWY TO STILESBORO RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 4.35 MANAGER: D. SMITH (CM)

ATLANTA TIP f CO 24 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 6685 AFTER 96

COBB 721685

MARS HILL RD FM STILESBORO RD TO SR 3/COBB PARKWAY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.13 MANAGER: D. SMITH (CM)

ATLANTA TIP f CO 124 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 4880 AFTER 96

COBB 721690

N.MARS HILL EXT FM SR 3/COBB PKWY TO I-75/BARTOW COUNTY
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.15 MANAGER: D. SMITH (CM)

ATLANTA rIP f CO 122
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY. ~.... ';,
AFTER 96 AFTER. 96

COBB 72Y125

"STP" FUNDING FOR 720125. NOT A REAL PROJECT. BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 1.00 MANAGER: BEN BUCHAN

COBB 72Y468

SHOWN FOR "BR" FUNDS ONLY .... SEE 720468 FOR PROJECT INFO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,00 MANAGER: UNKNOWN

ATLANTA TIP f AT12/C024 CONG DIST. 6 & 5 .
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 720125 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CO 225
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 720468 IS AN ASSOCIATED PROJECT.

PE 1993

UNDERWAY

ROW 1985 UNDERWAY

CONST 1996

$ 1000

FED SHARE $

800

GA. SHARE $

200

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

500

FED SHARE$

400

GA. SHARE$

100

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATIO~

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 82

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O-B-B------S-R---36-0-/M--A-C-L-A-N-D--R-D--F-M---SR---1-7-6--TO---PO-W--D-E-R--S-P-R-IN-G--S--R-D------------------A-T-L-A-N-T-A--T-I-P--f--C-O--3-9---------------------P-E--1-9-8-6-----U-N-D-ER-W--AY

730860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 6 & 7

ROW LOCL

PROJECT MILEAGE : 4.00

CONST 1994

$ 9477

MANAGER: G. 'ROSS

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 7582

FEDERAL-HIGHWAY ADMIN FUNDS

GA. SHARE$ 1895

0TH SHARE$

COBB 731020

SR 120 LOOP/N. MARIETTA. PARKWAY AT COLE STREET TURN LANES/ TRAFFIC PROJECT MILEAGE : .17 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: D. GODWIN

ATLANTA TIP f co234 CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW LOCL

<:;ONST 1994

$

94

FED SHARE$

85

GA. SHARE$

9

0TH SHARE$

COBB 751430

FRNTG RD 1-WY PAIR FM ROTTENWOOD CK TO NORTHSIDE DR/FULTON RECONSTRUCTION & -WIDENING. NO LANE ADDITION PROPOSED.'.
PROJECT MILEAGE : 1.70 MANAGER: D. SMITH (M)

ATLANTA TIP f CO-R 67 _CONG DIST. 6 & 5
FUND SOURCE_: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

COBB 751670

CR 2845/BELLS FERRY RD FM I-575 N TO CHEROKEE CL/INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: H. ASHMORE

COBB 751675

SHILOH RD REALIGNMENT WITH SHALLOWFORD RD@ BELLS FERRY RD INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE: .43 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: H. ASHMORE (C)

COBB 751890

SR 176@ SR 6 BUS & MACEDONIA RD INCLU UPGRADE SIGNALS

INTERSECTION IMPROVEMENT/ TRAFFIC

.

PROJECT MILEAGE : .38 - EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: D. GODWIN

COBB 752220

SR 6BU/ELLIOTT RD OVER POWDER SPRINGS CRK W OF POWDER SPS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED-LANES. PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP f CO 71 CONG DIST. 6 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CO 136 CONG DIST. 6 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA. TIP f CO 227 CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I CO 247
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW LOCL

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
3631 2905
726

PE NONE $

0

ROW LOCL

!,'.!ONST 1994

$

357

FED SHARE$ 286

GA. SHARE$

71

0TH SHARE$

PE NONE $

0

ROW 1993 UNDERWAY

CONST 1994

$

403

FED SHARE$

363

GA. SHARE$

40

0TH SHARE$

PE 1995 ROW CONST

$

16

AFTER 96

AFTER 96

:,

<i

!

It '

., ...

~

~

~

~

.

'It

~

~

M~

~

~

~ ~Lli!'II
,:.

~~

t:;:.";~;,;~

~fo-'~

~;,;;,j

~-, l'.1." ~_-!i

r: ::
. ~...

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 83

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O-B-B-------SR---6-B-U-S--R-E-A-L-I-G-N-M-E-N-T---W-IT-H---B-R-O-W-N-S-V-I-L-L-E--R-O-A-D------------------------A-T-L-A-N-T-A--T-I-P--f--C-O--2-4-8--------------------P-E--1-9-9-4-----U-N-D-ER-W--AY

752260 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 7

ROW LOCL

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST 1995 $ 210

MANAGER: D. GODWIN

FUND SOURCE: HWY. SAFETY

FED SHARE$ 189

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

21

0TH SHARE$

COBB 752310

OLD CANTON RD OVER SHEFFER CK TRIBUTARY/SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP t CO 246

CONG DIST. 6

.

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

12

ROW LOCL

CONST 1996 $ 802

FED SHARE$

642

GA. SHARE$ 160

0TH SHARE$

COBB 770262

CR 133/HOLT ROAD AT SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP t CO 242
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994 $ 465

FED SHARE$

372

GA. SHARE$

93

0TH SHARE$

I

COBB 770263

CR 257/KURTZ ROAD OVER NOONDAY CREEK

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE: ,00

MANAGER:

r..

ATLANTA TIP t CO 244
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994 $ 455

FED SHARE$ 364

GA. SHARE$

91

0TH SHARE$

COBB . 770264

CR 822/BURNT HICKORY ROAD OVER ALLATOONA CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: ,00 MANAGER:

ATLANTA TIP t CO 243
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994 $ 522

FED SHARE$ 418

GA. SHARE$

104

0TH SHARE$

COBB 770291

CR 2793/QUEENS MILL ROAD OVER NICKAJACK CREEK REPLACEMENT OF THE EXISTING BRIDGES($). FROM 2 TO 3 LANES.
PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP t CO 241
CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

700

FED SHARE$ 560

GA. SHARE$ 140

0TH SHARE$

COBB 770350

OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP t CO 239
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

5

AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPT.ION

P. I.NO.

PROJECT DATA

COBB

HIRAM RD/CR 2081 OVER POWDER SPRINGS CREEK

COMMENTS

ATLANTA

TIP

f

----------
CO 245

770360 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 7

PROJECT MILEAGE: .00

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY AD~IN FUNDS

16-Sep-1993 Page 84

FISCAL

COST

YEAR

ESTS

----- .---------------------

PE 1995

$

5

ROW LOCL

CONST

AFTER 96

COBB 770370

FRIENDSHIP CHURCH RD/CR 942 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER:

ATLANTA TIP f CO 240

'CONG DIST. 6

.

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

5

AFTER 96

COBB 770470

HISTORIC DEPOT RENOVATION IN KENNESAW ANO WALKWAYS MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

COBB 770601

TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN COBB COUNTY
SIGNALS/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

COBB 770635

6 COBB COMMUNITY TRANSIT BUSES EQUIP. PURCHASE / CAPITAL PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

1.

COBB

DECK OVERLAYS FOR SIX BRIDGES IN DISTRICTS 7 & 3

811040 BRIDGES/ RECST. OR REHAB.

PROJECT MILEAGE : .00

MANAGER: UNKNOWN

COBB 810040

DECK OVERLAYS FOR SIX BRIDGES IN DIST 7,3; TO SHOW STP FUNDS
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: UNKNOWN

ATLANTA TIP f CO 237
CONG DIST. 6 FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t CO 249
CONG DIST. 6 ,- 7 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CO-R 163 CONG DIST. 6 &- 7 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 6 & 7 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS 810040 IS AN ASSOCIATED PROJECT.
cqNG DIST. 6: & 7 FUND SOURCE:- SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 811040 IS AN_ASSOCIATEO PROJECT.

PE LOCL

ROW LOCL

CONST 1996 $ 156

FED SHARE$ 125

GA. SHARE$

0TH SHARE$

31

PE 1994

$

50

ROW NONE

$

0

CONST 1995

$

950

FED.SHARE$ 760

GA. SHARE$

0TH SHARE$

190

PE NONE $ ROW NONE $ CONST 1995 $'
FED SHARE$ GA. SHARE$
0TH SHARE$

0 0 1320 1056
264

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 1497 1347
150

PE_ NONE $

0

ROW NONE $

0

CONST 1994

$

363

FED SHARE$ 290

GA. SHARE$

73

0TH SHARE$

. . (. ..

,,

,.... ' ~

~

== @.iB ~ , ~ ,, ~

== . : : i

=~ --~

~ -~ ~-a Fii>~

~

~~~

tf~,~~

j,:,-,~)

-~ ,,.::1

l

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 85

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COFFEE SR 135/ US 221/ IN DOUGLAS@ SEVENTEEN MILE RIVER

PE 1986 UNDERWAY

421240 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5 LANES.

CONG DIST. 8

ROW NONE $

0

PROJECT MILEAGE : .20

CONST 1995 $ 1656

MANAGER: J. LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 1325

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

331

421320 IS AN ASSOCIATED PROJECT.

0TH SHARE$

COFFEE 421320

SR 135 FM SR 32/DOUGLAS NE TON DOUGLAS BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 3.10 MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421240 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW LOCL

CONST 1995 $ 2748

FED SHARE$ 2198

GA. SHARE$

550

0TH SHARE$

COFFEE 421340

SR 32/DOUGLAS FM W CL TOE/SR 206 .. INCL 1-WAY PAIR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 3.57 MANAGER: M. REYNOLDS

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 431280 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY ROW 1994 $ 2780 CONST 1995 $ 4402
FED SHARE$ 3522 GA. SHARE$ 880 0TH SHARE$

COFFEE 421345

SR 32 FM W/CR 296 EAST TO WEST CITY LIMITS OF DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.13 MANAGER: M. REYNOLDS(CM)

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 3289 AFTER 96

COFFEE 42134X

SR 32@ 2 LOC/IRWIN & 2 LOC/COFFEE ... SEE IRWIN COUNTY
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LINDSEY

COFFEE 422250

SR 31/US 441@ MILL CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: J. GRAYBEAL

COFFEE 422350

SR 135 AT MCDONALD ROAD IN DOUGLAS

TURN LANES/ TRAFFIC

PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

r..

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421343 IS AN ASSOCIATED PROJECT.
CONG DIST. 8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421910 IS AN ASSOCIATED PROJECT.
ALBANY TIP f H/R-2 CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0.

ROW 1993 UNDERWAY

CONST 1994

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

PE 1994

$

9

ROW 1995 $

10

CONST 1996 $ 289

FED SHARE$ 289

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 86

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O--F-FE-E----S-R---1-3-5-@---IN-T-E-R-S-E-C-T-I-O-N--O--F--CR---5-7-9-; --C-R--1-4-6-; --C-R--1-4-8----------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY

431250 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 2

ROW 1994 $

3

PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1995 $ 383

MANAGER: J. LINDSEY

FUND SOURCE: HWY, SAFETY

FED SHARE$ 345

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

38

0TH SHARE$

COFFEE 431280

LANDSCAPING/ST SCAPE MASTER PLAN DWTOWN DOUGLAS (421340)

LANDSCAPING/ ENHANCEMENT

PROJECT MILEAGE : ; 50 - EXIST. LANES: 0 /PROPOSED LANEiS.: 0

MANAGER: M. REYNOLDS (C)

.

CONG DIST. 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS 4Z1340 IS AN ASSOCIATED PROJECT.

PE LOCL

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE $

0TH SHARE$

0 1520 1216
366 670

COFFEE 442470

SR 31/US 441@ MCNEAL DR/CHESTER AVE
TURN LANES/ TRAFFIC PROJECT MILEAGE : ,14 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LINDSEY

CONG DIST. 8 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1994 $ 146

FED SHARE$ 131

GA. SHARE$

15

0TH SHARE$

COFFEE 442600

SR 158 AT SHIRLEY AVENUE IN DOUGLAS TURN LANES/ TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 8
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

9

ROW 1994 $

10

CONST 1995 $ 289

FED SHARE$ 289

GA. SHARE$

0TH SHARE$

COFFEE 450380

SR 206/PERIMETER RD FM SR 32 TO SR 31 IN DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.72 MANAGER: J. LINDSEY (M)

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY

$

50

AFTER 96

\



,,

1f",....

,, 'I

D!!!IJ

lffll!!'!!!

. l. l!!M ~ ~

e..M!!

P-i\J

~
=ill

ffil~

~

E@Xff.f,l

.~~~~

H~

~,:-::ii

:~::.~-~

(',:-;<c;;cl

. ~""2i-i~ -.

~~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 87

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-,N--O-.----------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-STS
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE

4B1407 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 8 & 2

FUNDS RECIPIENT: CITY OF MOULTRIE

OPERATING 1994 $

37

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

23

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4Bl408 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH

CONG DIST. 8 & 2

OPERATING 1995 $

38

FUND SOURCE: RURAL TRANSIT

FED SHARE$

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4B1409 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH

CONG DIST. 8 & 2

OPERATING 1996 $

40

r_

FUND SOURCE: RURAL TRANSIT

FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

25.

GA. SHARE$

0TH SHARE$

15

COLQUITT SR 37/MOULTRIE FM OKAPILCO CRK TO SR 35 BYP
421840 TURN LANES/ TRAFFIC PROJECT MILEAGE : .60 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J, LINDSEY

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994 $ 675

FED SHARE $

675

GA, SHARE $

0TH SHARE $

COLQUITT SR 133: CSX RR OVER SR 133 0.3 MIN OF SQUARE IN MOULTRIE 422000 BRIDGE REMOVAL/ NEW CONSTRUCTION
PROJECT MILEAGE : 1,00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: J. LINDSEY

PE NONE $

0

CONG DIST. 2

ROW 1994 $

5

CONST 1994 $ 259

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 207

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

52

422005 IS AN ASSOCIATED PROJECT,

0TH SHARE$

COLQUITT SR 37: REMOVE SAG@ OLD CSX RR WEST OF SQUARE IN MOULTRIE 422005 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .75 MANAGER: J. LINDSEY

PE NONE $

0

CONG DIST. 2

ROW NONE $

0

CONST 1994 $ 119

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

95

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

24

422000 IS AN ASSOCIATED PROJECT.

0TH SHARE$

COLQUITT SR 37/W. CENTRAL AVE@ 11TH ST NB&SB IN MOULTRIE & SIGNALS 442490 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .SO - EXIST, LANES: 2 /PROPOSED LANES: 3 MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1994 $

5

CONST 1994

$

125

FED SHARE$ 113

GA. SHARE$

13

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY.1996

16-Sep-1993 Page 88

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

--------------------------------------------------------------------------------------------- .----------------------- -.-----------

COLQUITT CR 477/COOL SPRINGS RO @ INDIAN CK 2 MI NE OF MOULTRIE

PE NONE $

0

442670 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.

CONG DIST. 2

ROW LOCL

PROJECT MILEAGE : .19 MANAGER:

..

CONST 1996 $ 104

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

83

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

21

0TH SHARE$

COLQUITT CR 235/JAMES KING RO@ BRIDGE CREEK 470685 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .16 MANAGER: J. LINDSEY
(

CONG [?IST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL-HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994 $ 232

FED "SHARE$ 186

GA. SHARE$

46

0TH SHARE$

,

I
,, ~ .

:-.

.~

. ,

,1

(!'!!!ft

~

~ ~
lfJ ,,..

~

~

-"'-'"'

~l

~ ==

~~
'

!'.fl?Y:Ci
"

~

~.,C6t~

f;~-_.~

~~!-~

..~?4i

(... , .. ~-.:-
I)~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 89

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P .I.NO.

PROJECT DATA

COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE

COMMENTS

YEAR

ESTS

--- --------- ---------------------.----------------------

2Bl098 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 10

FUNDS RECIPIENT: COLUMBIA

OPERATING 1994 $

45

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

27

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

19

COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl099 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1995 $

47

FUND SOURCE: RURAL TRANSIT

FED SHARE$

28

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

19

COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll00 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1996 $

49

FUND SOURCE: RURAL TRANSIT

FED SHARE$

29

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

20

COLUMBIA ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
2C2098 TRANSIT FACILITIES./ CAPITAL FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

. FED SHARE $:

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

COLUMBIA ONE STANDARD VAN AND ONE MOBILE RADIO 2C2099 TRANS.IT FACILITIES / CAP ITAL
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

COLUMBIA I-20@ WHEELER RD/SEE RICHMOND CO 21049X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: NEIL DAVIS
r.
COLUMBIA I-20: REST AREA 162,163; 152, 153 IN MORGAN CO. 21056X REST AREA/ RECST. OR REHAB,
PROJECT MILEAGE : ,00 - EXIST, LANES: 2 /PROPOSED LANES: 4 MANAGER: UNKNOWN

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 210490 IS AN ASSOCIATED PROJECT.
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL.. HIGHWAY ADMIN FUNDS 210560 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION. STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 90

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O--LU--M-B-IA---SR---2-3-2--W-B--M-P--2-.5---3.-6-;-E-B---3-.6---5-.0;WB -4-.2-5---6-.-9-/-IN--C-L---C-LV-T--------------A-U-G-U-S-T-A--T-IP---f--G-I-0-0-6---------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

221410 ADDITION OF A PASSING LANE.

CONG DIST. 10

ROW 1993 UNDERWAY

PROJECT MILEAGE: 2.40

CONST 1994

$ 2800

MANAGER: D_- GRIFFITH

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 2240

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

560

0TH SHARE $

COLUMBIA SR 10/US 78 FM UCHEE CRI< E/CR 258 TO SR 223/RICHMOND CO 221790 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.10 MANAGER: BILL MOSKAL

AUGUSTA TIP f RC-004 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

67

$

70

AFTER 96

COLUMBIA SR 104 FM MP 11.95 S/CR BO .TO SR 47@ POLLARDS CORNER 221800 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.96 MANAGER: D. GRIFFITH
COLUMBIA SR 104 FM MP B.95 S OF CR 515 TO MP 11.95 S OF CR BO 221805 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.00 MANAGER: UNKNOWN

CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
AUGUSTA TIP f CC-076 CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY.ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

PE 1992 ROW 1995 CONST

UNDERWAY $ 1392 AFTER 96

COLUMBIA SR 28/FURYS FERRY RD FM RIVERWATCH PKWY TO CR 98/RICHMOND 221860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.11 MANAGER: D. CHURCH (M)

AUGUSTA TIP f RC-CC-048 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 2164 AFTER 96

COLUMBIA SR 28/FURY'S FERRY RD@ BASTON RD/VAUGHN RD 222230 INTERSECTION IMPROVEMENT/ RECST. OR REHAB.
PROJECT MILEAGE : .43 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: D. CHURCH (C,M)
COLUMBIA SR 47 SB FRM MP 2.45 NEAR KEG CREEK SOUTH TO MP 3.88 231350 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 1.43 ~AGER:

AUGUSTA TIP f CC-048
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW 1993 UNDERWAY.

CONST 1994

$ 2443

FED SHARE $ 1954

GA. SHARE $

489

0TH SHARE $

PE 1995 ROW CONST

$

23

AFTER 96

AFTER 96

,, ,.. ~

'-

.,



I~

~

,. = ~

~


., ~

~ ~

~~

~~~l~

=~,;;J:i

~

r15~i!!l~

~i~,,.~

k~,#,

~~i~f.fu

j'; ..-~:

f .. :...

..~~---,r"~

t).\

GEORGIA DEPARTME;~lT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 91

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO.

PROJECT DATA

----- -------------

----------

----------------------------------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--

COLUMBIA SR 104/WASHINGTON RD@ CLUB CAR DRIVE (COMMERCIAL DRIVE)

AUGUSTA TIP f CC-076

PE 1994 UNDERWAY

231370 INTERSECTION IMPROVEMENT/ TRAFFIC

.

CONG DIST. 10

ROW LOCL

PROJECT MILEAGE : ,90 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D. GRIFFITH

FUND SOURCE: HWY. SAFETY

CONST 1995

$

670

FED SHARE$

603

FEDERAL'HIGHWAY ADMIN FUNDS

GA. SHARE$

67

0TH SHARE$

COLUMBIA SR 383/BELAIR RD FM FT GORDON GATE TO I-20/SEE RICHMOND CO 25032X RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : ,33 MANAGER: D, CHURCH

AUGUSTA TIP f RC-CC-207 CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 250320 IS AN ASSOCIATED PROJECT.

PE NONE $

0

ROW 1993 UNDERWAY

CONST 1994

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

COLUMBIA CR 145 FM CR 209 TO BASTON; NEW LOC FM OWENS TO OLD EVANS 250470 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.82 MANAGER: D. CHURCH (M)

AUGUSTA TIP f CC-7063 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

COLUMBIA CR 145 FM BASTON TO RIVERWATCH PK;BASTON FM SR 104 TO CR 145 250475 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : ,40 MANAGER: D. CHURCH

AUGUSTA TIP f CC-7063 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

COLUMBIA SR 104 FM CR 91/SCOTTS WAY NW TOE/CR 515 (INCL BRIDGES) 262080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.21 MANAGER: UNKNOWN

AUGUSTA TIP f CC-076 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

COLUMBIA CR 136/BASTON RD FM CR 145 N TO SR 28/MARTINEZ 262410 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .72 MANAGER: D. CHURCH
COLUMBIA DAVIS RD EXT FM WASHINGTON RD TO MARTINEZ BLVD 262490 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : .06 MANAGER: D. GRIFFITH

AUGUSTA TIP f CC-7006 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
. AUGUSTA TIP f CC-7006 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993

U~DERWAY

.-

ROW LOCL

CONST 1995 $ 3073

FED SHARE$ 2458

GA. SHARE $:> 615

0TH SHARE$

PE 1992 UNDERWAY ROW 1995 $ 1995 CONST 1996 $ 3502
FED SHARE $ 2802 GA. SHARE $ 700 0TH SHARE $

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$

505

FED SHARE$

404

GA. SHARE$

101

0TH SHARE$

PE 1995 ROW LOCL CONST

$

12

AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 92

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COLUMBIA KATHERINE STREET AT CSX RAILROAD . t279476X

PE NONE

$

0

270920 RR XING / TRAFFIC

CONG DIST. 10

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

90

MANAGER: W HESTER

FUND SOURCE: HWY. SAFETY

FED SHARE$

81

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

9

0TH SHARE$

,, ...

'

...

t

l -~

rn!!l'!!ffl

l!!ffl l!ffl!!I ~

1,1

J

1e

~

~

M1ffilti1

~~

~

,, IlQ.:,aa..-=;:;c:JI

~ ...

~~ttt~

j:0'.:.:::~~

....~ /:":-::~~::~ p,w1
I

"'--'

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 93

PROJECT LISTING.BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O-O-K-------I --7-5-@ ---S-R--3-7-/-A-D-E-L---[F-M---1-5-0-0--F-T--W-E-S-T--TO---6-5-0--F-T--E-A-S-T--I-- 7--5-) --------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

410420 INTERCHANGE/ RECST. OR REHAB.

CONG DIST. 8

ROW 1995

$

100

PROJECT MILEAGE : .40 - EXIST. LANES: 2 /PROPOSED LANES: 5

CONST 1996 $ 3071

MANAGER: RON BRAZIEL

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 2764

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

307

0TH SHARE $

COOK 410510

I-75 FM LOWNDES CO LINE TO SR 37 RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.
PROJECT MILEAGE : 7.75 MANAGER: H. ASHMORE(M)

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

COOK 410520

I-75 FM SR 37 TO CR 246 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 9.30 MANAGER: H. ASHMORE(M)

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

COOK 410530

I-75 FM CR 246/COOK TO CR 204 IN TIFT COUNTY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 10.23 MANAGER: H. ASHMORE(M)

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AF-TER 96

COOK 410600

I-75 IMPROVE SANITATION, PARKING & LIGHTS@ REST AREAS 16&7 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER:

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

ROW 1994

$

CONST 1995 $

FED SHARE$

GA. SHARE$

0TH SHARE $.

500 2
1783 1605
178

'

COOK

SR 37/ADEL FM 600' E/I-75 'EAST TO PARRISH ST

421780 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

PROJECT MILEAGE : .99

MANAGER: RON BRAZIEL

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1992

UNDERWAY

ROW 1995

$ 3110

CONST 1996 $ 1702

FED SHARE$ 1362

GA. SHARE$

340

0TH SHARE$

r_-

COOK 431430

SR 7 AT NORFOLK SOUTHERN RAILROAO .. f723363R
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: ff.HESTER

CONG DIST:. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE

$

0

CONST 1994

$

79

FED SHARE$

71

GA. SHARE$

8

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FYl994/FY 1996

16-Sep-1993 Page 94

COUNTY

DESCRIPTION

P.I.NO.

PROJECT DATA

----------- ---- -- COOK

- CR 59 AT NORFOLK SOUTHERN RAILROAD .. f723177P

.

470980 RR XING / TRAFFIC

PROJECT MILEAGE,: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: W HESTER

,

.

FISCAL

COST

--- -------CO-MME-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PE NONE $

0

CONG DIST. 8

ROW NONE

$

0

CONST 1994

$

90

FUND SOURCE: HWY. SAFETr

FED SHARE$

81

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

9

0TH SHARE$

/

(.

. ~

. ,

1

' ~

. ~

''

~

~

~ ~

.,

J

!.,

~

~j

lt!'.;;~ff ~

~

Eri'iff,~ "

~~ .,

~~

t(&.:':~~

1.. .-:---S:

I.>;-;;~;,;"

t-;~.,,4Y::~


i-11

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 95

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O-W--E-TA----I---8-5--F-R-O-M--M--P --33--T-O--M--P --4-1 --IN-C--L--R-E-P-L--O-F--G-U-A-R-D-R-A-I-L----------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY

311600 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 3

ROW NONE $

0

PROJECT MILEAGE : 8,00 - EXIST. LANES: 4 /PROPOSED LANES: 4

CONST 1994 $ 4821

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$ 4339

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

482

0TH SHARE$

COWETA 31171W

CALL BOXES ON I-85 FM ALABAMA TO SR 74/FULTON ... SEE HARRIS UNKNOWN/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 7 & 3
FUND SOURCE: I-STATE MAINT... FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

COWETA 321310

SR 16, US 27 ALT FM EVANS RD/CR 677 N TO NEWNAN BYPASS

RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. {.

PROJECT MILEAGE : 1.33



MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

683

FED SHARE$ 546

GA. SHARE$

137

0TH SHARE$

COWETA 321450

SR 14/ US 29A/ GREENVILLE ST@ A&WP RR BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : ,34 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 UNDERWAY ROW 1994 $. 309 CONST 1995 $, 1215
FED SHARE $'. 972 GA. SHARE$ 243 0TH SHARE$

COWETA 321850

SR 34_ FM NEAR WHITE OAK CRK E TOE/SR 154 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.80 MANAGER: J. GRAYBEAL

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1994
CONST

UNDERWAY $ 144'1 AFTER 96

COWETA 322060

SR 54/34 FM FISCHER XRDS TO SR54 . TO SR 74 .. FAYETTE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.79 MANAGER: M. REYNOLDS (M)

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY
AFTER 96 AFTER 96

COWETA 322063

SR 54@ LINE CREEK/ALSO FAYETTE CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .01 MANAGER: M. REYNOLDS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 96

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

--- --- ---- P. I.NO.

PROJECT DATA

COWETA SR 34 E/NEWNAN FM SR 154 TO SR 54@ FAYETTE CO LINE

322340 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 4.11

MANAGER: M. REYNOLDS (M)

FISCAL

COST

-----------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PE 1992 UNDERWAY

CONG DIST. 3

ROW

AFTER 96

CONST

AFTER 96

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

COWETA 322345

SR 34@ SHOAL CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS (M)

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

COWETA . 322390

SR 34/NEWNAN FM SR 34 BYP TO I-85 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .71 MANAGER: M. REYNOLDS

COWETA 322400

SR 34 BYP/NEWNAN FROM SR 70/INCLUDE CSX RR BRIDGE TO SR 34

RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES. r-

PROJECT MILEAGE : 3.09

.

MANAGER: M, REYNOLDS (C)

CONG DIST: 3 FUND soyRcE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST .. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1994 $ 500 CONST 1995 $ 1264
FED SHARE $ 1011 GA. SHARE $. 253
0TH SHARE $

PE 1992 ROW 1995 CONST

UNDERWAY $ 2249 AFTER ,96

COWETA 331730

CR 555 OVER MESSIERS CREEK NORTH OF JCT SR 14 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)

COWETA 331920

CR 547/GORDON RD@ LITTLE WHITE OAK CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .57 MANAGER: GORDON BROWN

COWETA 332090

SR 74/85 AT KEG CREEK EAST OF SENOIA ADDITION OF A PASSING LANE. . PROJECT MILEAGE : .30 MANAGER:

CONG DIST, 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 33Y090 IS AN ASSOCIATED PROJECT.

PE LOCL

ROW LOCL

CQ_NST 1996 $ 137

. FED SHARE $ 110

GA. SHARE$

27

0TH SHARE$

PE 1992 UNDERWAY

ROW LOCL

CONST 1994 $ 341

FED SRARE $ 273

GA. SHARE$

68

0TH SHARE$

PE 1994 ROW 1996 CONST

$

10

$

5

AFTER 96


. '

. ..

~ ,,

-~

~

. ~

.,

~
,

~ ~-

lt'IK~

tfLJ.~W!,

~

~:~ # .,

~= r,,;:zyc'<'.;,

~~ti~

~';~i

r,::;::;:~

rt"'--'.':~:_-i

f""." ... -,~<:


., .

'1

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 97

PROJECT LISTING BY COUNTY FY 1994/FY 1996

I COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O-W--E-TA----S-R--1-4-/-U-S--2-9--A-T--S-R---15-4-------------------------------------------------------------------------------------P-E--N-O-N-E-----$------0

332170 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 3

ROW 1996 $

58

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST

AFTER 96

MANAGER: GORDON BROWN (M)

.

FUND SOURCE: HWY. SAFETY

FEDERAL HIGHWAY ADMIN FUNDS

COWETA 332180

SR 16 AT SR 54 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST .. LANES: 2 /PROPOSED LANES: 4 MANAGER: GORDON BROWN(M)

CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE ROW 1996 CONST

$

0

$

21

AFTER 96

COWETA 33Y090

SR 74 / 85@ KEG CREEK EAST OF SENOIA/ FOR 118 FUNDS UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

COWETA 342830

CR 252/SMOKEY ROAD OVER MOUNTAIN CREEK OVERFLOW REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER:

COWETA 350640

SR 70.N/NEWNAN@ WAHOO CRK & LITTLE WAHOO CR~ REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .38 MANAGER: GORDON BROWN

COWETA 350980

SR 34 AT FIVE EXISTING MEDIAN OPENINGS TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: GORDON BROWN(M)
l

COWETA 370781

CR 157/ROCKAWAY RD IN SENOIA@ CSX RR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .30 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 332090 IS AN ASSOCIATED PROJECT.

PE 1994 ROW 1996 CONST

$

0

$

0

AFTER 96

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS.

PE LOCL

ROW LOCL

CONST 1996 $ 102

FED SHARE$

82

GA. SHARE$

20

0TH SHARE$

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1990 UNDERWAY

ROW 1992 UNDERWAY

CONST 1994

$ 1046

FED SHARE $ 837

GA; SHARE $ 209

0TH SHARE $

CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

18

$

1

AFTER 96

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL.HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995 $ 374

FED SHARE$ 299

GA. SHARE$

75

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 98

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. LNO.

PROJECT DATA

C-O-W--E-TA----C-R---1-34-/-T-O-P-E--R-O-A-D--O--V-E-R--P-IN--E--C-REEK

-------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S-PE LOCL

370820 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 3

ROW LOCL

PROJECT MILEAGE : .25

CONST 1994

$

137

MANAGER: GORDON BROWN(C)

F.UND SOURCE: BRIDGE PROGRAM

FED SHARE$ 110

FEDERAL HIGHWAY ADMIN FUNDS

GA .. SHARE $

27

0TH SHARE$

COWETA 370825

CR 252/SMOKEY RD OVER MOUNTAIN CK NE OF CORINTH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994 $ 266

FED SHARE$ 213

GA. SHARE$

53

0TH SHARE$

COWETA 370828

CR 76 OVER LITTLE WHITE OAK CREEK SOUTH OF TURIN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)

CONG DIST. 3
FUND SOURCE:_BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

. 231
185 46

COWETA 370831

CR 160 OVER DEAD OAK CREEK SE OF SENOIA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .25 MANAGER: GORDON BROWN(C).

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

226

FED SHARE$ 181

GA. SHARE$

45

0TH SHARE$

COWETA 370834

CR 122/TURKEY CK RD OVER TURKEY CREEK EAST OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LO.CL CONST 1994 $
FED SHARE$ GA. SHARE$
0TH SHARE$

. 185 148 31

COWETA 370910

CR 157@ LINE CRK & LINE CRK OFLW . . ALSO FAYETTE CO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : 53 .
MANAGER: GORDON BROWN

CONG DIST. 3
FUND-SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 37091X IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 964 FED SHARE$ 771
GA. SHARE$ 193 0TH SHARE$

COWETA 370970

CR 336/WITCHER ROAD OVER WAHOO CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .25
MANA9ER:

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

352

FED SHARE$ 282

GA. SHARE$

70

0TH SHARE$

J

.~

.

,,

~

~

~ ~1~,

I)

,.,.

~~

~Jffil

==:r;:w

t~f~;:!~

~~

.. .. ,~~;~

~

Jittlij~

~\\".

r.f!f'~~;1,

1; ~-:: ~~ffi

..f;r.,.,,-)

~ ..

~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 99

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P-,-I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COWETA CR 261/CORNITH ROAD OVER SANDY CREEK TRIBUTARY

PE LOCL

370980 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES,

CONG DIST. 3

ROW LOCL

PROJECT MILEAGE : ,25

CONST 1994

$

197

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

158

FEDERAL HIGHWAY ADMIN FUNDS

GA, SHARE$

39

0TH SHARE$

COWETA 370990

CR 33/MAJOR ROAD OVER LITTLE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER:

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

115

FED SHARE$

92

GA. SHARE$

23

0TH SHARE$

COWETA 371000

CR 139/NEEDY ROAD OVER PINE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .25 MANAGER:

CONG DIST, 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

144

FED SHARE$ n5

GA. SHARE$

29

0TH SHARE$

(_

COUNTY P. I.No.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1208 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD MANAGER: STEVE KISH

( CONG DIST. 3 & 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOHIN FUNDS

16-Sep-.1993 Page 100

FISCAL YEAR

COST ESTS

OPERATING 1994 $

54

FED SHARE$

30

GA. SHARE $

0TH SHARE$

24

CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1209 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD
MANAGER: STEVE KISH

CONG DIST. 3 & 2

FUND SOURCE: RURAL TRANSIT

OPERATING 1995 $

63

FED SHARE$

35

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$

0TH SHARE$

28

CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1210 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD
MANAGER: STEVE KISH

CONG DIST. 3 & 2

OPERATING 1996 $

65

FUND SOURCE: RURAL TRANSIT

FED SHARE$

36

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$

0TH SHARE$

29

CRAWFORD ONE STANDARD VAN ANO ONE MOBILE RADIO 3C2208 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CRAWFORD MANAGER: STEVE KISH

CONG DIST. 3 & 2

CAPITAL 1994

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

CRAWFORD SR 96/FALL LINE FWY@ FLINT RIVER TRIS 320955 REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .20 MANAGER: J. GRAYBEAL

CONG DIST. 3 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 363130 IS AN ASSOCIATED PROJECT.

PE 1991 UNDERWAY.

ROW NONE $

0

CONST 1996' $ 191

FED SHARE $ 153

GA. SHARE $

38

0TH SHARE $

CRAWFORD SR 42@ CULPEPPER CREEK W OF SR 7 331600 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

1.

CONST 1995 $ 366

FED SHARE $ 293

GA. SHARE $

73

0TH SHARE $

~

'

.'

~

~

., ~ '

~ ,..,,

~

~

-fill,~

~~;~ - ~

-,,,.._,,,,,,.., ~.,

)~

~ir;.::i.lil

j>>l:Mij

t~-.-:--c:,r:~

.~..;.-.:.~:..( ~

,, ;.t

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

CRISP 41025X

I-75 FM SR 159 NEAR ASHBURN TO SR 300@ CORDELE .. SEE TURNER RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .OO MANAGER: H. ASHMORE

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410250 IS AN ASSOCIATED PROJECT.

16-Sep-1993 Page 101

FISCAL YEAR

COST ESTS

PE 1987 ROW 1996 CONST

UNDERWAY

$

0

AFTER 96

CRISP 410260

I-75 FM 1 MILES OF CR 117 TO DOOLY CO LINE RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 7.13 MANAGER: H. ASHMORE

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY_ FEDERAL HIGHWAY ADMIN FUNDS 410265 IS AN ASSOCIATED PROJECT.

PE 1986 UNDERWAY

ROW NONE $

0

CONST 1995 $ 10879

FED SHARE$ 8703

GA. SHARE$ 2176

0TH SHARE$

CRISP SR 30/US 280 MP EB 14.35-15.35; WB 17.0-18.5

PE 1992

UNDERWAY

420605 ADDITION OF A PASSING LANE.

CONG DIST. 8

ROW 1994

$

8

PROJECT MILEAGE : 2.50

(.

CONST 1995 $ 1006

MANAGER: J. LINDSEY

FUND SOURCE: NAT'L HIGHWAY

FED SHARE-$

805

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 201

0TH SHARE$

CRISP 422190

SR 257 NEAR CORDELE@ MIDWAY RD/CR 266 & CR 353 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY (M)

CONG DIST. 8
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

5

ROW 1995 $

3

CONST 1996 $ 547

FED SHARE$

547

GA. SHARE$

0TH SHARE$

CRISP 470841

CR 241@ GUM CREEK/LAKE BLACKSHEAR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994 $ 310

FED SHARE$

248

GA. SHARE$

62

0TH SHARE$

CRISP 471000

REHAB & RESTORE THE HISTORIC DISTRICT OF CORDELE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST; 8 & 2
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 $

6

ROW NONE $

0

CONST 1996 $

92

FED SHARE$

74

GA. SHARE$

1

0TH SHARE$

19

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 102

COUNTY

DESCRIPTION

FISCAL

COST

----- P. I.NO.

PROJECT DATA

DADE ---C-O-U--N-TY O-PE-R-A-TED PUBLIC---T-R-A-NSIT SERVICE

--------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

6B1343 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: DADE MANAGER: STEVE KISH

OPERATINGl994

$

23

FUND SOURCE: RURAL TRANSIT

FED SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

9

DADE 6Bl344

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE KISH

CONG DiST. 9

OPERATING 1995

$

23

FUND SOURCE: RURAL TRANSIT

FED SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

0 GA. SHARE$

0TH SHARE$

9

DADE 6Bl345

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE-KISH

CONG DIST: 9

OPERATING 1996 $

25

FUND SOURCE: RURAL TRANSIT

FED SHARE$

15

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

10

DADE 6C2343

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DADE MANAGER: STEVE KISH

/
C

DADE 610880.

I-24 FM TENNESSEE STATE LINE TO TENNESSEE STATE LINE GUARDRAIL/ MAINTENANCE PROJECT MILEAGE : .40 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER:

CONG DI~T. 9 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CHATTANOOGA-TIP I 23
CONG DIST. 9 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

CAPITAL 1994

$

31

FED SHARE$

25

GA. SHARE$

3

0TH SHARE $-

3

PE NONE $

0

ROW NONE

$

0

CONST 1994 $ 734

FED SHARE$

661

GA. SHARE$

73

0TH SHARE$

DADE 610940

I-24 FROM TENN STATE LINE TO TENN STATE LINE

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 9

PROJECT MILEAGE : 4.60 - EXIST. LANES: 4 /PROPOSED LANES: 4

MANAGER: L. SEABR09K

FUND.SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED.SHARE$
GA. SHARE$
0TH SHARE$

0 0 2300 2070 230

DADE 621230

SR 136/TRENTON FM CR 52 TO SR 58/US 11 INCL INTERCHANGE@ 59 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE: 1.00 MANAGER: H GANNAWAY

CONG DISJ. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y230 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1995

$

410

CONST 1996 $ 2617

FED SHARE$ 2094

GA. SHARE$ 523

0TH SHARE$

.' ...

~

~

~ ..=~

~,!:~

~:c:-E

= ~

=~ ,:;,~ , ~

1w1-..,.;::1;.;.:.,n,;-;,;;1,,

11.~,(K.~,

~:,~1~i

r~:"' :;

~~'.-: -

"

.. f!,4~:,S.,).";~'i

...

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 103

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ----------------P-R-O-J-ECT--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DADE

SR 136 FM CR 52 TO SR 58; TO SHOW IM FUNDS FOR INT WITH I-59

PE NONE $

0

62Y230 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 9

ROW 1995

$

100

PROJECT MILEAGE : .00

CONST 1996

$

500

MANAGER:

FUND SOURCE: I-STATE MAINT.

FED SHARE$

450

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

50

621230 IS AN ASSOCIATED PROJECT.

0TH SHARE$

DADE 630915

SR 136 E/TRENTON EB 6.4-7.2/EB 10.6-11.85/WB 10.6-11.85 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.05 MANAGER: BILL MCVEY

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$

147

CONST 1995 $ 1613

FED SHARE $ 1290

GA. SHARE $

323

0TH SHARE $

DADE 631070

BURKHALTER GAP RD EXT FM SR 189 TO CR 392/WALKER [& BR] CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: BILL MCVEY (M)

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

(-

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 104

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO,

PROJECT DATA

--------------------------------------

---------------------------------------CO--M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DAWSON SR 9 FM SR 53 TO NEAR CR 54;SR 53 FM S/CR 167 TO CS 501

PE 1993 UNDERWAY

122040 TURN LANES/ TRAFFIC

CONG. DIST. 9

ROW LOCL

PROJECT MILEAGE : 1.00 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST

AFTER 96

MANAGER: L. OWENS (M)

FUND SOURCE: HWY. SAFETY

FEDERAL HIGHWAY ADMIN FUNDS

r_.

v

,. ,,_

. '

.. 1

~

~

~

~

~

~

~

r,:!i,-.i,!~

~!!!~

., ~ /""'':-, 4

'i, r ~.:.ij

1,::..,

}~::~ r y,~,

r;~ r . .~1;

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

DECATUR 431050

SR 309@ BIG SLOUGH CREEK EAST OF SR 97 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

~ -...~~

..

!

16-Sep-1993 Page 105

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1994

$

5

CONST 1995

$

409

FED SHARE $

327

GA. SHARE $

82

0TH SHARE $

(

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-;-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 106

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

'

----------------------------------------------------------------------------------

DEKALB TRANSIT TRAVELER DEMONSTRATION PROJECT

7D701X TRANSIT PROJECTS/ CAPITAL

CONG DIST. 5

FUNDS RECIPIENT: CITY OF ATLANTA

CAPITAL 1994

$

0

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

DEKALB 7V1016

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY MANAGER: STEVE KISH

(-

CONG DIST. 4 & 11

CAPITAL 1994

$ 100

YUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

80

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

10

0TH SHARE$

10

DEKALB 7V1017

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH

CONG DIST. 4 & 11

CAPITAL 1995

$ 104

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

83

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

11

0TH SHARE$

10

DEKALB 7Vl018

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH

CONG DIST. 4 & 11

CAPITAL 1996

$ 107

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

86

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

10

0TH SHARE$

11

DEKALB 710323

BIKE/PEDESTRIAN WAY - MORELAND AVE TO STONE MTN PARK BICYCLE/PED. FACILITY/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. BOULINEAU

ATLANTA TIP f DK 121 CONG DIST. 4 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL
ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
1920 1536
64 320

DEKALB 712120

REDAN RD BR WON OVER I-285 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .20 MANAGER: BILL MOSKAL

ATLANTA TIP f DK-R 35 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL
CONST

UNDERWAY AFTER 96

DEKALB 712450

I-285@ ST MT FWY;L'NCEVILLE HWY; BTWN US 78 & L'NEVILLE HWY
RAMP/ NEW CONSTRUCTION PROJECT MILEAGE : .94 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BILL MOSKAL

ATLANTA TIP f DK-R 107 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 71Y450 IS AN ASSOCIATED PROJECT. -

PE 1989 UNDERWAY ROW 1990 UNDERWAY CONST 1994 $ 3509
FED SHARE$ 2807 GA. SHARE$ 702 0TH SHARE$

,. ,,.

,.

.' ,...

~

~

~

~

Ji?'J;,..oli;'d

li!-~'!IJ

~~Z.2~-~!J

-"""'o.,;

~~

fa~~~~~~


~Ltl

fX;:&;l(i

1:,,'"".,

i:" . ,,.,;

~v..--;,~-;-f


.,,

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

1 6 - s - - 1, - 1 9 9 3 Page 107

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

D-PE-K-.IA-.L-NB-O--. --I--2-0-@ ---L-I-T-H-O-N--IAP-R-O-IN-JED-CU-T-S-TD-RA-IA-TAL---BL-V-D------------------------------------A-T-L-A-N-T-CA-O-M.T-MI-PE-N-fT-S-R--5-9----------------------P-EY-E-A1-R9-9-3-----U-NE-DS-TER-SW--AY

712870 INTERCHANGE/ NEW CONSTRUCTION

CONG DIST. 11

ROW 1995 $ 5840

PROJECT MILEAGE : .40 - EXIST. LANES: 0 /PROPOSED LANES: 4

CONST 1996 $ 2027

MANAGER: G. ROSS

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE $ 1622

FEDERAL HIGHWAY ADHIN FUNDS

GA, SHARE $

405

71Y870 IS AN ASSOCIATED PROJECT.

0TH SHARE $

DEKALB I-285 FM MP O - 21; MP 31.3 - 46.9; MP 56.2-62.7;SEE FULTON

ATLANTA TIP f R 130

PE NONE

$

0

71300X UNKNOWN/ UNKNOWN

CONG DIST. 5

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

0

MANAGER:

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

713000 IS AN ASSOCIATED PROJECT,

0TH SHARE$

DEKALB 71307X

I-285 EB 49 SIGNS FM JONESBORO RD TO GLENWOOD RD ... FULTON
SIGNING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK

ATLANTA TIP f R 130

PE NONE

$

0

CONG DIST. 5 & 6

ROW NONE $

0

CONST 1994

$

0

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

713075 IS AN ASSOCIATED PROJECT,

0TH SHARE$

DEKALB 713100

COTILLIAN DR/SAVOY DR ONE-WAY PAIR ON EACH SIDE OF I-285 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. PROJECT MILEAGE : 1.03 MANAGER:

ATLANTA TIP f DK 117 CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

116

FED SHARE$

104

GA. SHARE$

12

0TH SHARE$

DEKALB 71314Z

COMMUNICATION CABLE ON I-75 FROM I-85 NORTH TO I-285 .. FULTON

MISCELLANEOUS IMPROVEMENTS/ TRAFFIC

t

PROJECT MILEAGE : 5.00 - EXIST. LANES: 0 /PROPOSED LANES: 0

ATLANTA TIP f R 169 CONG DIST. 5 & 6

PE NONE

$

0

ROW NONE $

0

CONST 1994 $

0

MANAGER: BURT RIDDLE

FUND SOURCE: CONG HIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $. GA. SHARE$

0TH SHARE$

DEKALB 713200

I-285 FM INTERCHANGE@ I-20 E TO INTERCHANGE@ I-85 N
BARRIERS/ MAINTENANCE PR9JECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ATLANTA TIP f R 130 CONG DIST. 4
FUND SOURCE: I-STATE CONST. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

165

FED SHARE$ 149

GA. SHARE$

17

0TH SHARE$

DEKALB 71Y450

I-285@ ST HT FWY:L'NCEVILLE HWY: BTWN US 78 & L'NEVILLE HWY
RAMP/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:.BILL MOSKAL

ATLANTA TIP f DI<-R 107 CONG DIST. 4.
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712450 IS AN ASSOCIATED PROJE;CT,

PE 1989 UNDERWAY

ROW 1990 UNDERWAY

CONST 1994

$

250

FED SHARE $ 225

GA. SHARE $

25

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 108

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.
-------------------

PROJECT DATA
---

-------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DEKALB I-20@ LITH IND BLVD - SHOWN FOR REMAINING UNFUNDED CST$

ATLANTA TIP f R 59

PE NONE $

-0

71Y870 INTERCHANGE/ NEW CONSTRUCTION

CONG DIST; 11

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 4

CONST 1996 $ 5973

MANAGER: G. ROSS

.

-

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE$ 4778

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 1195

712870 IS AN ASSOCIATED PROJECT.

0TH SHARE $.

DEKALB 721050

SR 124@ STONE MOUNTAIN CRK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .50 MANAGER: D. GODWIN
j

ATLANTA TIP f DK.99 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

DEKALB 721055

SR 124@ YELLOW RIVER/ ALSO GWINNETT CO

REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.

PROJECT MILEAGE : .03

.

MANAGER: RAY METTS (C/M)

ATLANTA TIP f DK 100 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

1

AFTER 96

DEKALB 72127X

SR 42/MACON HWY FM S/ANVILBLOCK RD TO OLD TONY RD/CLAYTON RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE: .00. MANAGER: M. REYNOLD~

DEKALB 721330

SR 124/ROCK CHAPEL RD FM UNION GR RD N TO PLEASANT HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .90 MANAGER: D. GODWIN

ATLANTA TIP f CL10/DK8 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721270 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 84 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1992 UNDERWAY

CONST 1996 $

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1993 ROW 1996 CONST

UNDERWAY $ 1481 AFTER 96

DEKALB 721350

SR 12/COVINGTON HWY FM SR 124 E TO TURNER HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.20 MANAGER: D. CHURCH (M)

ATLANTA TIP f DK 30 CONG DIST.- 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

DEKALB 721380

SR 857/ROCKBRIDGE RD FM SR 10/MEMORIAL DRE TO HAIRSTON RD

RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 2.20

.

MANAGER: .M. REYNOLDS (M)

r.

ATLANTA TIP f DK 25

CONG DIST. 4

.

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

:,

...

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

. .,

~

~

~

~

~~~

~~11.ll

~:m

~-m~

r,~1;~;:_i, . ~ . ~

~;,.~_'1',(1,

i';:-:"'./:N

l:i.:':

('~. ,Gd

... ~_,_.,.._V;:~

>

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 109

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DEKALB SR 857/ROCKBRIDGE RD FM HAIRSTON RD TO ST MTN-LITHONIA RD

ATLANTA TIP f DK 25

PE 1992

UNDERWAY

721390 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 4

ROW

AFTER 96

PROJECT MILEAGE : 1.90

CONST

AFTER 96

MANAGER: M. REYNOLDS (M)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 721400

ASHFORD-DUNWOODY/JOHNSON FERRY FM PTREE IND BLVD TO I-285 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.80 MANAGER: G. ROSS

DEKALB 721405

ASHFORD-DUNWOODY RD@ NANCY CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .02 MANAGER: G. ROSS

DEKALB 721530

SR 124 FM ROCKBRIDGE RD TO CENTERVILLE-ROSEBUD RD/GWINNETT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.10 MANAGER: RAY METTS (C/M)

ATLANTA TIP f DK 22

CONG DIST. 4 & 5

.

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

721405 IS AN ASSOCIATED PROJECT.

ATLANTA TIP f DK 22 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721400 IS AN ASSOCIATED PROJECT.

ATLANTA TIP f GW 76 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

PE 1992 ROW 1996 CONST

UNDERWAY $ 6737 AFTER 96

DEKALB 721535

SR 124 FM PLEASANT HILL RD TO ROCKBRIDGE RD/ INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.92 MANAGER: D. GODWIN

ATLANTA TIP f DK 85 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 2327 AFTER' 96

DEKALB 721880

STONE MOUNTAIN FREEWAY AT HUGH HOWELL ROAD INTERCHANGE INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.20 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: NEIL DAVIS

DEKALB . SR 212/BROWNS MILL RD@ POLE BRIDGE CRK 730970 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES .
.PROJECT MILEAGE : .15
MANAGER: D. GODWIN

ATLANTA TIP f DK-R 117 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 98 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

10

CONST 1996

$ 3267

FED SHARE $ 2614

GA. SHARE $

653

0TH SHARE $

PE 1993 UNDERWAY

ROW 1994

$

10

CONST 1995

$

498

FED SHARE $

398

GA. SHARE $

100

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 110

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

------------------------- ----------

DEKALB REDAN RD@ SNAPFINGER CRK

---------- ------- -----A-T-L-A-N.-T-AC-O-MT-MI-PE-N-fT-S-R-T-P--D-K---2-3-----------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY

751270 REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.

CONG DIST . 4

ROW LOCL

PROJECT MILEAGE : .10 MANAGER: BILL MOSKAL

FUND SOURCE: BRIDGE PROGRAM

CONST

AFTER 96

r_

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 751320

CR 5189/ROCKBRIDGE RD@ SNAPFINGER CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .28 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f DK 101 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

DEKALB 751340

CR 23/FAYETTEVILLE RD@ SUGAR CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .50 MANAGER: D. GODWIN

DEKALB 751370

CHAMBLEE-TUCKER RD FM NEW P'TREE RD TO BUFORD HWY/SR 13 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.40 MANAGER: D. GODWIN

ATLANTA TIP f DK 111 CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 1 C_ONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGH.WAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 421

FED SHARE$ 337

GA. SHARE$

84

0TH SHARE$

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96'

DEKALB 751380

CHAMBLEE-TUCKER RD FM I-85 TO I-285 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.30 MANAGER: D.SMITH (C)

DEKALB 751440

WINTERS CHAPEL RD FM OAKCLIFF RD TON/CHICOPEE RD(& SIGNAL) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE.: .90 MANAGER: G. ROSS

DEKALB 751445

WINTERS CHAPEL-OAKCLIFF RD CONN@ SOUTHERN RR BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .08 MANAGER: G.ROSS

ATLANTA TIP f DK 17. CONG DIST. 4
FUND SOURCE: I-STATE CONST. FEDERAL.HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 44 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 75Y440 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 94 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 751440.IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 5009
FED SHARE$ 4258 GA. SHARE$ 751 0TH SHARE.$

PE 1992 UNDERWAY

ROW LOCL CONST 1995

-'
$ 6609

FED SHARE$ 5287

GA. SHARE$ 1322

0TH SHARE$

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

....

... >

-~

-~

-==

~~

~

~

~

lffl~-4~5

~
"'-"''=-41

~

.......,;,,~
ln-'
.,-.

~-:- ,--._._~\

~:;7r,:::., ...:.-1

t:-:=T:~~~

~~~-it~

- ~~--..";:-".!



COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

16-Sep-1993 Page 111

FISCAL YEAR

COST ESTS

DEKALB 751490

SR 859/COOLEDGE-BROCKETT RD FM E PONCE DE LEON TO ST MTN FWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .30 MANAGER: D. GODWIN

ATLANTA TIP f DK 79 CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1996

$ 1307

FED SHARE $ 1046

GA. SHARE $

261

0TH SHARE $

DEKALB 751495

SR 859/COOLEDE-BROCKETT RD FM STONE MTN FWY-SR 8/W SIGNALS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.00 MANAGER: D. GODWIN

ATLANTA TIP f DK 79 CONG DIST. 4 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$

42

AFTER 96

AFTER 96

DEKALB 751940

CR 5109/STEPHENSON RD@ CROOKED CRK

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .18

.

MANAGER: D. GODWIN

ATLANTA TIP f DK 97 CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 752100

EAST PONCE DE LEON AT RAYS ROAD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .28 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN

ATLANTA TIP f DK102 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 752110

SR 154/MEMORIAL DRIVE@ WHITEFOORD AVE. INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .12 - EXIST. LANES: 3 /PROPOSED LANES: 4
MANAGER: D. GODWIN

ATLANTA TIP f AT 29 CONG DIST. 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 752470

SR 236 AT NORTHLAKE PARKWAY AND SIGNAL SYSTEM TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP f DK 119 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 752480

SR 155/CANDLER RD FM COLUMBIA/CLIFTON SPR TO SR 260 GLENWOOD
SIGNALS/ TRAFFIC PROJECT MILEAGE : 3.60 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP f DK 120 CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1991

UNDERWAY

ROW LOCL

CONST 1995 $ 272

FED SHARE$ 218

GA. SHARE$

54

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1995

$

158

FED SHARE$

142

GA. SHARE$

16

0TH SHARE$

PE NONE $

0

ROW 1994

UNDERWAY

CONST 1994

$

91

FED SHARE$

82

GA. SHARE$

9

0TH SHARE$

PE 1994

$

7

ROW 1995 $

10

CONST 1996

$

231

FED SHARE$

208

GA. SHARE$

23

0TH SHARE$

PE NONE

$

0

ROW NONE

$

0

CONST 1994

$

384

FED SHARE$

346

GA. SHARE$

38

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 112

----------------------------------------------------------------- COUNTY
P. I.NO.

DESCRIPTION PROJECT DATA

DEKALB WINTERS CHAPEL RD FM OAKCLIFF RD TON/CHICOPEE RD (&SIGNAL)

COMMENTS ATLANTA TIP f DK 44

FISCAL YEAR
PE 1992

COST ESTS
UNDERWAY

75Y440 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

CONG DIST. 4

ROW LOCL

PROJECT MILEAGE : .00 MANAGER: G. ROSS

FUND SOURCE: OLD URBAN SYSTEM

CONST 1995 $

1

FED SHARE$

1

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

751440 IS AN ASSOCIATED PROJECT.

'0TH SHARE $

DEKALB 770280

CR 690/ALFORD RD@ CROOKED CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .25 MANAGER: D. GODWIN

ATLANTA TIP I DK 96
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1991 UNDERWAY

ROW LOCL

CONST 1994

$

220

FED SHARE$

176

GA. SHARE$

44

0TH SHARE$

DEKALB 770440

PEDESTRIAN/LANDSCAPING ALONG US 278 IN AVONDALE BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

l.

DEKALB 770480

SOUTH DECATUR TROLLY LINE CONVERSION BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : 00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

DEKALB 770530

D'TOWN ST'SCAPES IN DECATUR;SIDEWALKS,X-WALKS,BENCHES,TREES MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ATLANTA TIP f DK 114 CONG DIST. 4
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t DK 116
CONG DIST. 4 & 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I DK 115
CONG DIST. 4
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1995 $

90

FED SHARE$

72

GA. SHARE$

0TH SHARE$

18

PE LOCL

ROW LOCL

CONST 1996

$

625

FED SHARE$

500

GA. SHARE$

0TH SHARE$

125

PE LOCL

ROW LOCL

CONST 1994

$

750

FED SHARE$

600

GA. SHARE$

0TH SHARE$ 150

DEKALB 770603

TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN DEKALB COUNTY
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

ATLANTA TIP f DK 118 CONG DIST. 4 & 11
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $'

ROW NONE $

CONST.1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

50 0
1108 886 1 221

DEKALB 770640

CR 299/N CLARENDON AVE AT CSX RAILROAO ... f279941U
RR XING / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER

CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$-

0

ROW NONE $

0

CONST 1994

$

81

FED SHARE$

73

GA. SHARE$

8

0TH SHARE $

t

o

. '

~

-~

~~

=I C=-

~~

~

~mH~

f~l~i}';1~;

~~

1,~ . -~'~1

rt:~:fJ

~.:~

~i.l~

~~

~

"

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

DEKALB 770650

CR 899/LAREDO DR AT CSX RAILROAD ... f279944P
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER

CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

i~~~-~1
t

.,,

16-Sep-1993 Page 113

FISCAL YEAR

COST ESTS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

76

FED SHARE$

68

GA. SHARE$

8

0TH SHARE$

DEKALB 81104X

OVERLAYS FOR 013-0013,089,0089,119-0002,119-0040,139-0004
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 10 & 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

C .

I

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

Page 114

COUNTY

DESCRIPTION

--P-.I-.-NO--. ---

PROJECT DATA
--

DODGE COUNTY OPERATED PUBLIC TRANSIT SERVICE

FISCAL

COST

.

---- COMMENTS----------------------------Y-E-A-R--------E-S-T-S--

2Bll03 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 8

FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

OPERATING 1994 $

75

FUND SOURCE: RURAL TRANSIT

FED SHARE$

45

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

30

DODGE 2Bl104

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

CONG DIST. 8

OPERAT-ING 1995 $

79

FUND SOURCE: RURAL TRANSIT

FED SHARE$

47

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

32

DODGE 2Bl105

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1996 $

84

FUND SOURCE: RURAL TRANSIT

FED SHARE$

50

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

34

DODGE 2C2103

ONE CONVERSION VAN, ONE STANDARD VAN, AND TWO MOBILE RADIOS
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

CONG DIST. 8

CAPITAL 1994

$

50

FUND SOURCE: RURAL TRANSIT.

FED SHARE$

40

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

0TH SHARE$

5

DODGE 2C2104

ONE CONVERSION VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

CONG DIST. 8

CAPITAL 1995

$

30

FUND SOURCE: RURAL TRANSIT

FED SHARE$

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

DODGE 221970

SR 87/US 23 /EASTMAN FROM NW OF CR 141 TO NW OF CR 332 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE : .60 MANAGER: D. GRIFFITH

DODGE 231340

r . SR 27@ SR 87, SECOND AVE, SR 46 IN EASTMAN SIGNALS/ TRAFFIC PROJECT MILEAGE : .. 50 - EXIST. LANES: 3 /PROPOSED LANES: 3 MANAGER: BURT RIDDLE

CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

381

FED SHARE $ 305

GA. SHARE $

76

0TH SHARE $

PE NONE $

0

ROW 1994 $

5

CONST 1994 $ 150-

FED SHARE$ 150

GA .. SHARE $

0TH SHARE$

:t-

..

. .,

~

~

~

~

~

~

R21)W.:JJ

~~

~

j,,:;.~:-~li.l

1"&:'f':.i '(".-.::~,~~

li1~:~-~~1

1/rr:;:~~1~-~

~i<;~,j

~,i;.:,;.'-,:,._-:n;-,!

"



$'

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 115

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--, ----------------PR--O-JE-C--T--D-A-T-A------.---------------------------------------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
DOOLY CITY OPERATED PUBLIC TRANSIT SERVICE

3Bl218 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 2

FUNDS RECIPIENT: CITY OF VIENNA

OPERATING 1994

$

13

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

5

DOOLY 3B1219

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH

CONG DIST. 2

I

OPERATING 1995 $

13

FUND SOURCE: RURAL TRANSIT

FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

5

DOOLY 3B1220

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1996 $

13

FUND SOURCE: RURAL TRANSIT

FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

5

DOOLY 3B1422

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1994 $

32

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

19

GA. SHARE$

0TH SHARE$

13

DOOLY 3B1423

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1995 $

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

20

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

13

DOOLY 3B1424

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1996 $

34

FUND SOURCE: RURAL TRANSIT

FED SHARE$

20

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

DOOLY 3C2218

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH

CONG DIST . .2

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 116

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

D-O-O-L-Y-----O-N-E--C-O-N--V-E-R-SI-O-N--V-A-N--W--IT-H--L--IF-T--A-N-D--O--N-E-M--O-B-IL-E---R-A-D-IO--------------------------------------------------------------------------

3C2422 TRANSIT FACILITIES/ CAPITAL

CONG DIST. 2.

FUNDS RECIPIENT: CITY OF UNADILLA

CAPITAL 1994

$

32

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

DOOLY 3C2423

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1995

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

DOOLY 311610

I-75 UPGRADE REST AREAS fl3 & 14(DOOLY) AND f 22 (MONROE) REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER:
L

CONG DIST. 2 & 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

ROW NONE $

CONST 1995 $

FED SHARE$

GA. SHARE$

0TH SHARE$

172
0 5730 5157
573

DOOLY 321610

SR 90@ SANDY MOUNT;LITTLE PENNAHATACHEE;TURKEY CK & TRIB REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PR0JECT MILEAGE : 1.20 MANAGER: GORDON BROWN

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1990 UNDERWAY

ROW 1995 $

32

CONST 1996 $ 173.4

FED SHARE$ 1387

GA. SHARE$ 347

0TH SHARE$

DOOLY 371210

CR 25 OVER HOGCRAWL CREEK 9 MI WEST OF UNADILLA REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. PROJECT MILEAGE : .21 MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

10

ROW LOCL

CONST 1996 $ 290

FED SHARE$ 232

GA. SHARE$

58

0TH SHARE$

,,



,-

. '



~

~

~ .. ~_i:~,

-=,.,..-_c;;,

r!'@.!!u~

~

tlfl.;t"'R!.J

r;;M"l'!,l

!.:." ..:::j

~--:f:1
"

,'~'~. ,'.~~.

:,T,J

l ' ' , ,.. ,.,.,:,

... """~~~-/

~-.~,,...~.
t

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 117

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O-.----------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DOUGHERT WHEELCHAIR LIFTS FOR PARATRANSIT VEHICLES (ADA)

401013 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 2 & 8

FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH

CAPITAL 1995

$

5

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

5

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

DOUGHERT WHEELCHAIR LIFTS FOR TRANSIT COACHES (ADA) 401015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 2 & 8

CAPITAL 1996

$

50

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

45

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

DOUGHERT CONCRETE REPLACEMENT FOR TRANSIT STATION 404010 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM. MANAGER: STEVE KISH

CONG DIST. 2 & 8

CAPITAL 1994

$ 166

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

133

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

16

0TH SHARE$

17

DOUGHERT VEHCLES, SHELTERS, FACILITY IMP., CAP. MAINT., ETC. 404011 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 2 & 8

CAPITAL 1995

$ 101

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

81

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

10

0TH SHARE$

10

DOUGHERT FACILITY IMP., CAP. MAINT., SHELTERS, FURNITURE, EQUIP., ETC

404012 TRANSIT PROJECTS/ CAPITAL

FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM

,

MANAGER: STEVE KISH

CONG DIST. 2 & 8

CAPITAL 1996

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

1527 1222
152 153

DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY
404016 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL'TRANSIT ADMIN FUNDS

OPERATING 1994 $ 780 FED SHARE$. 390 GA. SHARE$
0TH SHARE$ 390

DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY 404017 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DI~T. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ 717 FED SHARE$ 359
GA. SHARE $
OT~ SHARE$ 359

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 118

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--, -I.-N-O--, ---------------P-R-O-J-E-C-T-.-D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY

4D4018 TRANSIT PROJECTS/ OPERATIONS

CONG DIST. 2 & 8

FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM

OPERATING 1996 $ 737

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT

FED SHARE$

369

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

369

DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 4V1010 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1994

$

20

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

OOUGHERT ELDERLY AND DISABLED VEHICLES ANO EQUIPMENT 4V1011 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA
MANAGER: STEVE KISH

CONG DIST, 8 & 2

CAPITAL 1995

$

21

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

17

FEDERAL TRANSIT.ADMIN FUNDS

GA, SHARE$

2

0TH SHARE$

2

DOUGHERT ELDERLY ANO DISABLED VEHICLES AND EQUIPMENT 4V1012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH
DOUGHERT SR 91/ PHILEMA RO IN ALBANY@ MUCKAFOONEE CREEK 421270 REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDEO LANES.
PROJECT MILEAGE :- .26 MANAGER: 0, CHURCH

CONG DIST. 8 & 2

CAPITAL 1996

$

22

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

ALBANY TIP I B-2
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421420 IS AN ASSOCIATED PROJECT.

PE 1986 UNDERWAY

ROW NONE $

0

CONST 1995 $ 1555

FED SHARE $ 1244

GA. SHARE $

311

0TH SHARE $

DOUGHERT PHILEMA RD FM SR 133 TO LEE CO LINE/EXCL BR@ MUCKAFOONEE CK 421420 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1,90 MANAGER: O. CHURCH (M)

ALBANY TIP I H/R-9
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421270 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY ROW LOCL
CONST 1995 $ 2408 FED SHARE$ 1926 GA. SHARE$ 482 0TH SHARE$

OOUGHERT SR 520/US 82/0GLETHORPE BLVD FM US 19 TO LOFTUS ST/ALBANY 421580 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : ,50 MANAGER: D. CHURCH

ALBANY TIP I HR/11
CONG DIST. 8
GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995 $ 946

FED SHARE $ 757

GA. SHARE $

189

0TH SHARE $



,.

,

.. ,-,

~

~

~ ~
'I

~
Q='ll

P..!!1~

~

~-;,!i!i"@ L ~

}!.. .-~~~:
f,

~-:",>~ I)

t'"' ~fti

l;::;.,:: . . . . .::

\(,~~-'-.',...,"l~{

i'i~

... i . , - . - , ..._,;;,'.

.. '

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-,1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 119

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

D-PO--U. -GI.-HN-EOR-T-. -S-R--3-/-U-S---19--A-T--P-PRR-OO-C-JET-CO-TR---D&-A-GTA-A-M-B-L-E--IN---A-L-BA-N-Y---------------------------A-L-BA--N-Y-C-OT-MI-PM-E-IN-T-HS-/-R---2----------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--0

422330 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 2

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

116

MANAGER:

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

116

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

DOUGHERT CR 459/COUNTY LINE RD@ PINEY WOOD CRK 431200 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .19 MANAGER: J. LINDSEY

ALBANY TIP I B-1
CONG DIST. B
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$

427

FED SHARE$

342

GA. SHARE$

85

0TH SHARE$

DOUGHERT RADIUM SPRINGS RD FM GARDEN HILL DR TO WHITEHEAD RD
450320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.10
MANAGER: D. CHURCH (C)

ALBANY T~P I H/R-10
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

1674 1339
502 837

DOUGHERT CR 539/DAWSON RD@ SR 520/US B2/LIBERTY XWAY ... & LEE CO 450400 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : 1.00 MANAGER: D. CHURCH

ALBANY TIP I H/R-13
CONG DIST. B
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW LOCL
CONST

UNDERWAY AFTER 96

DOUGHERT D'TOWN ENHANCEMENT OF ALBANY/TRAILS,LANDSCAPING,RAIL TERMINA 470910 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ALBANY TIP I TSM-5
CONG DIST, 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

DOUGHERT BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT f4
470990 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 $ ROW 1996 $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

so
. 200 1844
1475
50 419

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0 1242
994 248

GEORGIA DEPARTMENT OF TRANSPORTATION_

16-Sep-1993

STATE TRANSPORTATIQ'1 IMPROVEMENTS PROGRAM

Page 120

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P.I.NO.

PROJECT DATA

---------------------- ---------

--

DOUGLAS COUNTY OPERATED PUBLIC VANPOOL SERVICE

FISCAL

COST

- ------.-- COMM-E-N-TS----------------------------Y-E-AR---------E-S-T-S--

7Bl393 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 7

FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

OPERATING 1994 $

13

FED SHARE$

50

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

13

DOUGLAS 7Bl394

COUNTY OPERATED PUBLIC VANPOOL SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH

CONG DIST. 7

OPERATING 1995

$

18

FUND SOURCE: RURAL TRANSIT

FED SHARE$

66

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

18

DOUGLAS 7Bl395

COUNTY OPERATED PUBLIC VANPOOL SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPI:ENT: DOUGLAS MANAGER: STEVE KISH

CONG DIST. 7

OPERATING 1996 $

18

FUND SOURCE: RURAL TRANSIT

FED SHARE$

68

FEDERAL.TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

18

DOUGLAS 707031

PARK AND RIDE LOT I-20 & CHAPEL HILL RD.
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT- ADMIN FUNDS

CAPITALl994

$ 587

FED SHARE$ 470

GA. SHARE$

59

0TH SHARE$

59

DOUGLAS 7D7032

TRANSIT PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH

CONG. DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1995

$ 211

FED SHARE$ 169

GA. SHARE$

21

0TH SHARE$

21

DOUGLAS 7D7033

CAPITAL PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY
MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$ 211

FED SHARE$ 169

GA. SHARE$

21

0TH SHARE$

21

DOUGLAS 7Vl019

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENICES IN DOUGLAS COUNTY
MANAGER: STEVE KISH

CONG DIST . .-. 7

CAPITAL 1994

$

11

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

9

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1:

0TH SHARE$

1

.,

,-

.. ,.

,

-

lli,ii9

~

~ ,~

~~

I!!!!~~~

~~!~!~!

~~

~r::~:!'l

f::.....~

~a.t'iil ~
C

~r.r(~-.-...;--:'.

t .. : . ..:~

. .~ ~ ~

~--~/.i.,j t1,1

p-;-;,, 4.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 121

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-,-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGLAS ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

7V1020 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 7

FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY

CAPITAL 1995

$

11

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

9

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

DOUGLAS 7Vl021

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL . FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY
MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1996

$

12

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

10

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

DOUGLAS 720970

SR 92 EXT/DOUGLASVILLE FM SR B NW TO SR 92 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 1.20 MANAGER: BILL MOSKAL

ATLANTA TIP f DO 2

PE 1996 $- 150

CONG DIST. 7

ROW

AFTER 96

r.

CONST

AFTER 96

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

DOUGLAS 721320

BANKHEAD HWY FM SWEETWATER RD E TO THORNTON RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 1.30 MANAGER: D. SMITH

ATLANTA TIP I DO 16
CONG DIST. 7
FUND SOURCE: SURFACE.TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AF.TER 96 AFTER 96

DOUGLAS 721420

SR 92 FM S/SR 166 NE TO LAKE MONROE RD/CR 140 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.26 MANAGER: N. PASSMORE (M)

ATLANTA TIP f DO 28 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 1095~
AFTER 96

DOUGLAS 721435

SR 5/BILL ARP RD@ DOG RIVER SW OF DOUGLASVILLE REPLACEMENT OF THE EXISTING BRIDGES{$). FROM 2 TO 3 LANES.
PROJECT MILEAGE : .20 MANAGER: D. GODWIN

DOUGLAS 721470

SR 5 N&SB FM $/SWEETWATER RD TO S/DOG RIVER BRIDGE ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1,75 MANAGER: D, GODWIN

ATLANTA TIP f DO 42 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DO 38 CONG DIST. 7.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

1

CONST 1995

$

913

FED SHARE $ 730

GA. SHARE $ 183

0TH SHARE $

PE 1992

UNDERWAY

ROW 1993 UNDERWAY

CONST 1996 $ 790

FED SHARE $

632

GA. SHARE $

158

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 122

COUNTY

P.
-

I.N-O--. -----

DESCRIPTION

PROJECT DATA

--

-----

FISCAL.

COST

-----------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DOUGLAS SR 8/US 78/BANKHEAD HWY FM SR 92 EAST TO CR 15/SWEETWATER RD 721590. RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

ATLANTA TIP f DO 29 CONG DIST. 7

PE 1992 ROW

UNDERWAY AFTER 96

PROJECT MILEAGE : 5.90

CONST-

AFTER 96

MANAGER: D. SMITH (M)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

DOUGLAS 721770

SR 166 FM OLD LOWER RIVER RD/DOUGLAS TO SR 70/FULTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2,91 MANAGER: RON BRAZIEL (M)

ATLANTA TIP f DO 19 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER96
AFTER 96

DOUGLAS 742800

LOWER RIVER RD FM SR 92 TO CAMP CREEK PKWY/FULTON RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 6,30 MANAGER: K FULBRIGHT {M)

ATLANTA TIP f DO 21 CONG DIST. 7 & 5
FUND SOURCE: SURFACE TRANSPORT. rEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$ 250 AFTER 96

DOUGLAS 751820

DOUGLAS BLVD EXT FM CR 814 TO CR 115 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 1,80 MANAGER: RON BRAZIEL (M)

ATLANTA TIP f DO 32 CONG DIST. 7
.FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL .90NST

$ 103 AFTER 96

DOUGLAS 751825

DOUGLAS BLVD EXT FM CR 142 TO CR 814 CONSTRUCTIONOF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.00 MANAGER: RON BRAZIEL (H)

ATLANTA TIP f DO 31 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1996
ROW LOCL CONST

$ 103 AFTER 96

DOUGLAS 751970

CR 24/N BURNT HICKORY RD@ GOTHARD CREEK

1.

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE: .20

MANAGER: D. GODWIN

DOUGLAS 770162

CR 39/0LD ALABAMA RD@ SWEETWATER CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER: D. GODWIN

ATLANTA TIP f DO 41 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DO 39 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$

386

FED SHARE$

309

GA. SHARE$

77

0TH SHARE$

PE 1992

UNDERWAY

ROW LOCL

CONST 1994

$

644

FED SHARE$ 515

GA. SHARE$

129

0TH SHARE$

,,

\.

<

.. ,,,

~

~

~

't-."/=i'~~
'

!if~

!l~~:ffi

1,~

[lr!i!iffi

~;frr]

,. li.'",:~~;e, ~:-.:!.l!l ~ 12

~~

Jb,.~:ir:~~

~

!---;,-~ !"



4,,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 12.3

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

EARLY US 27@ WAMBLE CREEK SOUTH OF BLAKELY

PE 1992 UNDERWAY

421640 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 2

ROW NONE

$

0

PROJECT MILEAGE : .50

GRIP PROJECT

CONST 1996

$

230

MANAGER: RON BRAZIEL (M)

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

184

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

46

422210 IS AN ASSOCIATED PROJECT.

0TH SHARE $

EARLY 422090

SR 62/BLAKELY FM WEST OF SR 200 TO EAST OF SR 62 BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.70 MANAGER: J. LINDSEY (M)

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

10

AFTER 96

EARLY 431320

SR 1 OVER BLUE CREEK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

10

$

1

AFTER 96

C

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 124

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------CO-M--M-E-N-T-S-----------------.---------Y-E-A-R--------E-S-T-S--

ECHOLS SR 89/US 441 AT LONG CREEK

PE 1996

$

10

422425 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.

CONG DIST. 8

ROW NONE

$

0

PROJECT MILEAGE : .00

CONST

AFTER 96

MANAGER: N. PASSMORE (M)

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

422420 IS AN ASSOCIATED PROJECT.

ECHOLS 431060

SR 187@ SUWANNOCHEEE CRK /ALSO CLINCH COUNTY REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : 1.00
MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$ 1719

CONST 1995

$ 1366

FED SHARE $ 1093

GA. SHARE $ 273

0TH SHARE $

(.

. ,,

,.,

,:

~

~ -~

.~ , ~

~,~!ll

~

~.'!.Ii@

iel'!f!.~!!

~~l~

,, ,. ~ ,,.-,.~(::'!

~

~i'i."1

r.cr-:~:..i-.,

~

~. 111

,.._.... .,,,: ~a

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 125

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O- .---------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

EFFINGHA I-95 FM N/I-16 IN CHATHAM TO S.C. STATE LINE ... SEE CHATHAM

PE 1994 . $

0

51116X UNKNOWN/ UNKNOWN

CONG DIST. 1

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

0

MANAGER: UNKNOWN

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

511160 IS AN ASSOCIATED PROJECT.

0TH SHARE$

EFFINGHA I-16 WIDEN 10 BRIDGES@ MP 138.3; 145.9;- 146.6; 147.2/BRYAN 51119X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

EFFINGHA NEW PARALLEL BR/SR 21@ LITTLE EBENEZER CRK 521705 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS

CONG DIST. 1 GRIP.PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521700 IS AN ASSOCIATED PROJECT.

PE 1990 UNDERWAY

ROW NONE

$

0

CONST 1994

$

170

FED SHARE $ 136

GA. SHARE $.

34

0TH SHARE $

EFFINGHA SR 17&26/US 80 FM SR 17 TO CHERRY ST IN BLOOMINGDALE/O~:ATHAM 522170 RECONSTRUCTION & WIDENIN.G FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .79 MANAGER: M. REYNOLDS (M)

SAVANNAH TIP f 87 H3 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 896 AFTER 96

EFFINGHA CR 307@ EBENEZER CREEK NW OF CR 72
532390 BRIDGES/ REPLACEMENT PROJECT MILEAGE: .11 MANAGER: PETE BLOCKER

CONG DIST. 1 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 126

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

E-L-B-E-R-T-----CO--U-N-TY---O-P-E-R-A-TED P-U--B-L-IC---T-R-A-N-S-IT

SER--V-IC-E----------------------

------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

1Bl008 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 10

FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994

$

81

FED SHARE$

47

GA. SHARE$

0TH SHARE$

33

ELBERT 181009

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1995 $

82

FUND S.OURCE: RURAL TRANSIT

FED SHARE$

48

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

34

ELBERT 181010

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1996 $

87

FUND SOURCE: RURAL TRANSIT

FED SHARE$

51

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

36

ELBERT 1C2008

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT f:1ANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1994

.$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

ELBERT 1C2009

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED .. SHARE $

17

(.

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

ELBERT 1C2010

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1996

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

ELBERT 170990

CR 168/GOSS ROAD@ SOUTH BEAVERDAM CREEK NW OF ELBERTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER:

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

8

ROW LOCL

CONST 1996. $ 282

FED SHARE$ 225

GA. SHARE$

56

0TH SH~$

~ .,,

.j,

,1

,f ~

~

~

~

~~ti

' ~ -.

~

~

~~j!

~~;~!ii

~~~ill!

~
.'" '\al,

,~:'!'..:.J;.'.i
,;)

}!::::.-,'.!;~

~

f:~~-;..~~i

~:::: .i~

.,. ~~!'

!" '.......~.
4,,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 127

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ELBERT CR 183/C'WATER-PLANTATION@ GUM LOG BRANCH N OF ELBERTON

PE 1994

$

5

170991 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,

CONG DIST, 10

ROW LOCL

PROJECT MILEAGE : ,19

CONST 1996

$

173

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

138

. FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

35

0TH SHARE$

,.-,

(

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 128

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EMANUEL COUNTY OPERATED PUBLIC TRANSIT SERVICE

2Bll08 TRANSIT FACILITIES/ OPERATIONS

CONG ors,;. 1

FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

(

FUND SOURCE: RURAL TRANSIT

OPERATING 1994 $

31

FED SHARE$

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

13

EMANUEL 2Bll09

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

CONG DIST. 1

OPERATING 1995 $

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

19

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE$

14

EMANUEL 2Blll0

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

CONG DIST. 1

OPERATING 1996 $

34

FUND SOURCE: RURAL TRANSIT

FED SHARE$

20

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

EMANUEL 2C2108

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

CONG DIST. l

FUND SOURCE: RURAL TRANSIT

CAPITAL 1994

$

32

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

EMANUEL 2C2109

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

CONG DIST. l

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

EMANUEL 221300

SR 56@ N/S PRONG CANOOCHEE & OFLW;MCKINNEY BR;OGEECHEE OFLW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,80 MANAGER: D. GRIFFITH

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1994 $ 2285
FED SHARE $ 1828 GA. SHARE $ 457
0TH SHARE $

EMANUEL 222210

SR 26/SWAINSBORO@ SOUTHERN RR/REMOVE BR & CONST GRADE XING
BRIDGE REMOVAL/ NEW CONSTRUCTION PROJECT MILEAGE : .30 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GRIFFITH

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1995 CONST .

UNDERWAY

$

23

AFTER 96

i,.

,, ,.-,

'. ,,.,.

~

.-,~ . ~

~ ~
~

~

~

~JfL~

f,tW;,m

h.,:,n ~~

(

I

f-"';#.":l\ll

w~c':;':

f;~,......'{

~

~...

'(~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATI9N IMPROVEMENTS PROGRAM

Page 129

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O-.----------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

EMANUEL SR 46@ JACKS CREEK l MILE WEST OF CANDLER CO LINE

PE 1993 UNDERWAY

231130 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 1

ROW 1994

$

1

PROJECT MILEAGE : .30

CONST 1995

$

878

MANAGER: D. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

702

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

176

0TH SHARE$

EMANUEL 231380

SR 57/KITE RD@ MCLEOD BRIDGE RD/GOLF RD/ROBIN RD
INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .36 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH

CONG DIST. 1
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1994

$

9

CONST 1994

$

267

FED SHARE$ 240

GA. SHARE$

27

0TH SHARE$

EMANUEL 250460

OLD NUNEZ RD/CR 461 FM MEADOWLAKE PKWY/CR 365 TO SR 56/57 MINOR WIDEN & RESURF / RECST. OR REHAB. PROJECT MILEAGE : .95 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: D. GRIFFITH

CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$

658

FED SHARE$

526

GA. SHARE$

132

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 130

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

----------------------------------------

----------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

EVANS SR 73/US 301 FM TATTNALL CO LINE TO S CL/CLAXTON

PE 1993

UNDERWAY

522005 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 1

ROW 1995

$

200

PROJECT MILEAGE : 6.75

,

CONST

AFTER 96

MANAGER: PETE BLOCKER

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY AOMIN FUNDS

4

I 4

. '.

.,

Jm!ll!l!!I!

. ,, ~

~~

~ .

~

~

!i!~U~

~,i}'t!~

MJ

1~>. :~:~ ~ *

'tji;~:,;,':1

~~::~:-;-::~-;

i::~;~~1

:-: -. ::.:

~

..

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 131

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------------------------------------------------------- ---------------------------------------------------------------

FANNIN COUNTY OPERATED PUBLIC TRANSIT SERVICE

6B1348 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: FANNIN

OPERATING 1994

$

76

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

44

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

32

FANNIN 6Bl349

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

79

FUND SOURCE: RURAL TRANSIT

FED SHARE$

46

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

33

FANNIN 6Bl350

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1996 $

82

FUND SOURCE: RURAL TRANSIT

FED SHARE$

48

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

34

FANNIN 6C2348

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1994

$

31

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

FANNIN 621340

SR 5 FM SR 2/BLUE RIDGE N TO PROP MCCAYSVILLE BYP- NR CR 138 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 7.80 MANAGER: J. GRAYBEAL (M)

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FANNIN 630875

SR 60@ HEMPTOWN CRK/MINERAL BLUFF; @ YOUNG STONE CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .36 MANAGER: BILL MCVEY

FANNIN 63Y875

(_
PROJECT SHOWN FOR "STP" FUNDS ONLY ... SEE 630875 UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 63Y875 IS AN ASSOCIATED PROJECT.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630875 IS AN ASSOCIATED PROJECT.

PE 1988 UNDERWAY

ROW 1989 UNDERWAY

CONST 1994

$

611

FED SHARE $

489

GA. SHARE $

122

0TH SHARE $

PE 1988 UNDERWAY

ROW NONE

$

0

CONST 1994

$

209

FED SHARE $

167

GA. SHARE $

42

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 132

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P, I.NO.

PROJECT DATA

--------- - --- FANNIN SR 515 FM CR 300 (PICKENS) TO UNION CL .... PICKENS/GILMER

------C-O-M--M-E-N-T-S ---------------------------Y-EA--R --------E-S-T-S --

PE NONE $

0

67080Z

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 9

PROJECT MILEAGE : 48.26 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

ROW 1994

$

CONST 1994 $

FED SHARE$

0 0

FEDERAL HIGHWAY. ADMIN FUNDS

GA. SHARE$

670800 IS AN ASSOCIATED PROJECT.

0TH SHARE$

FANNIN 670930

RESTORE MINERAL BLUFF DEPOT MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW NONE $

0

CONST 1996 $ 128

FED SHARE$

102

GA. SHARE$

0TH SHARE$

26

l

C,0

'.

~

~

. ~
~


. ~
~

~Xil~

~ft~,~~

f);.(:.~11

t::v,;._i::~

\!(.:~--~::~

~

r.:e.~:~ :~

~

~,:~1::f

I\.'.

I~

~~ .

!t.&-..:--:,:-~'.~
f ..

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 133

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-------------------------------------------------------------! -------------------------------------------------------------------

FAYETTE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

.

3Vl022 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 3

FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY

CAPITAL 1994

$

10

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

FAYETTE 3V1023

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH.

CONG DIST. 3

CAPITAL 1995

$

10

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

FAYETTE 3Vl024

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH

CONG DIST. 3

CAPITAL 1996

$

10

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

FAYETTE 321950

SR 92 S/FAYETTEVILLE FM MCBRIDE RD/INMAN TO J MAYFIELD DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3,38 MANAGER: M. REYNOLDS (M)

ATLANTA TIP t FY 3
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 2313 AFTER 96

FAYETTE 321960

SR 85 $/FAYETTEVILLE FM $/BERNHARD RD TO OLD SR 92/F'VILLE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.58 MANAGER: M. REYNOLDS (M)

ATLANTA TIP t FY 6
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FAYETTE 321964

SR 85 FM SR 74 N TO BERNHARD RD/CR 126 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.30 MANAGER: M. REYNOLDS(CM)

ATLANTA TIP t FY 5
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FAYETTE 321966

SR 85@ WHITEWATER CREEK REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS (M)

ATLANTA TIP t FY 13
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1996

$

136

FED SHARE $

109

GA. SHARE $

27

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 134

PROJECT LISTING BY COUNTY .FY 1994/FY 1996

COUNTY

DESCRIP_TION

FISCAL

COST

P.I.NO.

PROJECT DATA

F-A-Y--E-T-TE----SR---5-4-@---S-C-L--RR

------

------

-----------A--T-L-A-N-TC-AO-M.-T-MI-PE-N-fT-S-FY---1-2---------------------P-EY-E-A1-R9-9-2-----U-EN-DS-TER-SW--AY

322065 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 3

ROW NONE

$

0

PROJECT MILEAGE : .01

CONST 1996

$

663

MANAGER: M. REYNOLDS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 530

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 133

0TH SHARE $

FAYETTE 32206X

SR 34/54 FM FISCHER CROSS RDS TO SR 74 ... SEE COWETA CO UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: M. REYNOLDS

r_-

FAYETTE 32206Y

SR 54@ LINE CREEK/SEE COWETA CO UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M. REYNOLDS

coNG oisT. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 322060 IS AN ASSOCIATED PROJECT.
CONG DIST. 3
FUND "SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322063 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1995 CONST

UNDERWAY

$

0

AFTER 96

PE NONE $

0

ROW NONE $

0

CONST 1996 $-

0

FED SHARE$

GA. SHARE$

0TH SHARE$

FAYETTE 322350

SR 74 FM CROSSTOWN RD/TDK BLVD NW TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 2:15 MANAGER: M. REYNOLDS

ATLANTA TIP f FY 9 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT . . FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FAYETTE 322355

SR 74 FM SR 85 NW TO CROSSTOWN RD/TDK BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.91
MANAGER: M. REYNOLDS (M)

ATLANTA TIP f FY 9 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AFTER 96 AFTER 96

FAYETTE 322357

SR 74@ FLAT CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .25 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f FY 15 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW NONE CONST

$

10

$

,o

AFTER 96

FAYETTE 322358

SR 74 BICYCLE BRIDGE OVER SR 74 IN PEACHTREE CITY
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: N. PASSMORE (C)

ATLANTA TIP t FY 14
CONG DIST. 3
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

754

FED SHARE$

603

GA. SHARE$

48

0TH SHARE$ 103



.

~

E:LL....,

~

~



,f

12L-.J
e_l

f,.JLi

P.tU.'.~

~1~

~--L,

t~}.,'!'l,J

r.. .,_.,.,i

1'r.~~'.~1~

~

::-:-:.....;,

i.'.::-:~-~~

r.~

~


!'.""'""''""~:


GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 135

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FAYETTE SR 74 AT PASCHALL ROAD IN PEACHTREE CITY

ATLANTA TIP f FY 9

PE 1994

UNDERWAY

322650 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 3

ROW 1994 $

10

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2

CONST 1994 $ 231

MANAGER:

FUND SOURCE: HWY. SAFETY

FED SHARE$ 208

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

23

0TH SHARE$

FAYETTE 322660

SR 85 AT HOOD AVENUE NORTH OF FAYETTEVILLE SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER:

ATLANTA TIP f FY 18 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 347

FED SHARE$

312

GA. SHARE$

35

0TH SHARE$

FAYETTE SR 74 AT CRABAPPLE/PEACHTREE, TYRONE AND JENKINS ROADS 322670 . ACCELERATION/DECELERATION LN / TRAFFIC
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER:

ATLANTA TIP f FY 19 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1995 $ 173

FED SHARE$ 156

GA. SHARE$

17

0TH SHARE$

FAYETTE 331930

SR 85 CONN FM CR 168 TO SR 85; PPL FM 4.0 TO 6.0 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.I,
PROJECT MILEAGE : 3.90 MANAGER: K FULBRIGHT (M)

ATLANTA TIP f FY 1 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1995 CONST

UNDERWAY $ 2950 AFTER 96

FAYETTE 342800

SR 85 CONN FM SR 16 IN SPALDING CTY N TO CR 168 IN BROOKS RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 3.34
MANAGER: GORDON BROWN(M)

ATLANTA TIP f FY 17
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 . ROW
CONST

$

70

AFTER 96

AFTER 96

FAYETTE 37091X

CR 157@ LINE CRK & OFLW .. SEE COWETA CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: UNKNOWN

FAYETTE 370920

CR 275/SHERWOOD RD@ WHITEWATER CREEK REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
370910 rs AN ASSOCIATED PROJECT.
ATLANTA TIP f FY 11 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1994 $ 341

FED SHARE$ 273

GA. SHARE$

68

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993. Page 136

COUNTY

DESCRIPTION

FISCAL

COST

P .I.NO.

PROJECT DATA

--------------------------------------

----

-------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FAYETTE SR 54@ MORNING & CAMP CRKS; FLINT RIVER/SEE CLAYTON CO

ATLANTA TIP f CL23/FY2

PE 1986 UNDERWAY

72104X REPLACEMENT OF THE EXISTING BRIDGES{S), NO ADDED LANES,

CONG DIST. 3

.

ROW 1994

$

0

PROJECT MILEAGE : ,00

CONST 1995

$

0

MANAGER: M; REYNOLDS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

FEDERAL HIGHWAY ADMIN FUNDS 721040 IS AN ASSOCIATED PROJECT,

GA; SHARE $ 0TH SHARE $

FAYETTE 72129X

SR 85 FM SR 279/FAYETTE TO ROBERTS DR/CLAYTON
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: K FULBRIGHT

ATLANTA TIP f CL15/FY4
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721290 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1996 CONST

UNDERWAY

$

0

AFTER 96

FAYETTE 72129Y

SR 85 NBL@ CAMP CREEK/SEE CLAYTON COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .OO, - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: K FULBRIGHT

ATLANTA TIP f CL 77 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
721295 IS AN ASSOCIATED PROJECT.

PE 1992 ROW NONE CONST

,UNDERWAY

$ .

0

AFTER 96

FAYETTE 721440

SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 & CLAYTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.53 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f CL41/FY10 CONG DIST. 3 .
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 72144X IS AN ASSOCIATED PROJECT.

PE 1996 ROW CONST

.$

144

AFTER 96

AFTER 96

FAYETTE 75185X

SR 314 FM SR 279 TO NORMAN DR/CLAYTON . SEE CLAYTON CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M GANNAWAY

ATLANTA TIP f CL5/FY8 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 751850 IS AN ASSOCIATED PROJECT.

PE 1996 ROW CONST

$

0

AFTER 96

AFTER 96



.



~

~

28 ~
~

l!-.'LL.1!

~!,

~UJ:-:~!C

t\.,l,,_.:'!l

!~l,r'J

,, ~

P,fj!itJ~

tt:.:~;re

t'fr~!.{tru

t>,.;;,

~

.. i.'. .:(;; I-'..,,:,'{, ..,,

, ..I~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 137

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FLOYD TRUCK, RADIOS, SECURITY CAMERAS, CAP. MAINT., SHELTERS, ETC

6D6010 TRANSIT PROJECTS / CAPITAL

1.

CONG DIST. 7

FUNDS RECIPIENT: ROME TRANSIT SYSTEM

CAPITAL 1994

$ 1072

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

B5B

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

107

0TH SHARE$

107

FLOYD 6D601l

5 TRANSIT BUSES, VAN, CAR, CAP. MAINT., SHELTERS, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1995

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

1116 B93 112 112

FLOYD 606012

5 TRANSIT COACHES, TOW TRUCK, CAP. MAINT., SHELTERS, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1996

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

1149 919 115 115

FLOYD 6D6013

PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994

$ ' 1330

FED SHARE $- 665

GA. SHARE $.

0TH SHARE $: 665

FLOYD 6D6014

PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

1184 213
213 11B4

FLOYD 6D6015

PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSiT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

1254 213 213
1254

FLOYD 6Vl010

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1994

$

23

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

2

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 138

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

F-L-O-Y-D-----E-L-D-E-R-L-Y--A-N-D--D--IS-A-B-L-E-D--V--E-H-IC--L-E-S--AND

E-Q-U--IP-M-E-N-T------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

6Vl011 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 7

FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA MANAGER: STEVE KISH

CAPITAL 1995

$

24

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

19

FEDERAL TRANSIT.ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

2

FLOYD 6V1012

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES.IN FLOYD MPO AREA MANAGER: STEVE KISH

CONG DIST. 7

l

CAPITAL 1996

$

25

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

20

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

FLOYD 610980

DECK OVERLAYS FOR 115-0006, 115-0007, 123-0024, 129-0066

BRIDGES/ RECST. OR REHAB.

.

PROJECT MILEAGE : .00

MANAGER: L. SEABROOK

FLOYD 620590

SR 1/US 27 IN ROME FM 5TH AVE TO JOHN DAVENPORT DR RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .20 MANAGER: H. ASHMORE

CONG DIST. 9 & 7
FUND SOURCE: I-STATE M!\,INT. FEDERAL HIGHWAY ADMIN FUNDS 61Y980 IS AN ASSOCIATED PROJECT.

ROME TIP I L-85-11

'

CONG DIST. 7

GRIP PROJECT

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 3135 2822 314

PE 1994 $ ROW 1995 $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

36 50 1215 972 243

FLOYD 620900

SR 101/S OF ROME OVER SR 20 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .30 MANAGER: RON BRAZIEL (M)

ROME TIP f S-86-24 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1985 ROW LOCL CONST

UNDERWAY AFTER 96

FLOYD 621075

US 27@ ARMUCHEE & LITTLE ARMUCHEE CRKS/CHATTOOGA CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .06 MANAGER: RAY METTS

FLOYD 621450

W ROME BP FM CR 638 TO CR 268/INCL BR@ COOSA RVR CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 1.10 MANAGER: M GANNAWAY

ROME TIP I L-89-8
CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621070 IS AN ASSOCIATED PROJECT.
ROME TIP .I L-89-10 CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1994 $ 725

FED SHARE $ 580

GA. SHARE $

145

0TH SHARE $

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$ 3952

FED SHARE $ 3162

GA. SHARE $

790

0TH SHARE $

,, "'

.

'

IH?-!dm

~

~ ~Lill! '

~

f!i'j!2!=~

~
1;;1~=

1'11'.~1~

~

~-~I\OC;<&

/i?'/,\';1~

~:i'&

r,t:~~-~~~

t~d.--:>:-~

,. ., . ,. . . ~~

~


j,:.-'>-,;--;


GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION-IMPROVEMENTS PROGRAM

Page 139

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I--.N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FLOYD SR 20/100 FM SR 100 NORTH TO SR 100 SOUTH@ COOSA/INCL CLVT

PE 1992 UNDERWAY

621550 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 7

ROW

AFTER 96

PROJECT MILEAGE : 2.95

CONST

AFTER 96

MANAGER: BILL MCVEY (M)

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY AOMIN FUNDS

FLOYD 621560

SR 53 FM MP 0.54 TO 14.15 [ WON 20 CLVTS) BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 14.89 MANAGER: BILL MCVEY (M)

FLOYD 621690

SR 101 FM CR 740/CS 899 NORTH TOE 12TH ST/ROME RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.84 MANAGER: RON BRAZIEL (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

44

AFTER 96

ROME TIP I S-92-25
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1994 ROW 1996 CONST

$

134

$ 1150

AFTER 96

FLOYD 621700

SR 20/NEW ROUTE/ATLANTA TO MEMPHIS HIGHWAY ... & BARTOW CO PRELIMINARY ENGINEERING/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: N PASSMORE (M)

ROME TIP f 621700 CONG DIST. 7
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE 1993 ROW NONE CONST NONE

UNDERWAY

$

0

$

0

FLOYD 631350

SR 53 AT SR 140

c

INTERSECTION IMPROVEMENT/ TRAFFIC

.

PROJECT MILEAGE : .02 - EXIST. LANES: 4 /PROPOSED LANES: 4

MANAGER: BILL MCVEY

FLOYD 650410

DIVISION ST/ROME FM SHORTER AVE TO REDMOND RO/& REMOVE RR BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.04 MANAGER: RON BRAZIEL

FLOYD 650460

SR 101 OVER ETOWAH RIVER IN ROME REHAB. OF THE EXISTING BRIOGE(S). FRO~ 4 LANES TO 5 LANES.
PROJECT MILEAGE : .37 MANAGER: D. SMITH

ROME TIP I S-93-1
CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
ROME TIP f L-85-12 CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
ROME TIP f L-89-4 CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0
o
165 149
17

PE 1993 UNDERWAY

ROW LOCL

CONST 1994 $ 1619

FED SHARE$ 1295

GA. SHARE$

324

0TH SHARE$

PE 1993 UNDERWAY

ROW 1996 $ 405

CONST

l AFTER 96

GEORGIA DEPARTMEL:T OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 140

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FLOYD CR 641 OVER POCKET/JOHN'S CK/S POCKET CAMPGROUND

PE 1993 UNDERWAY

670760 BRIDGES/ REPLACEMENT

CONG DIST. 7

ROW NONE $

0

PROJECT MILEAGE : .00

CONST 1994

$

220

MANAGER: BILL MCVEY

FUND SOURCE: FED. LANDS

FED SHARE$ 220

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

FLOYD 670770

CR 641 OVER JOHNS/POCKET CREEK
BRIDGES/ REPLACEMENT PROJECT MILEAGE : ,15 MANAGER: BILL MCVEY

FLOYD 670820

MAYO'S BAR LOCK AND DAM RESTORATION ON COOSA RIVER MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: MEG BRYSON

CONG DIST. 7
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
ROME TIP I 670820
CONG DIST. 7
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW LOCL
CONST 1994 $ 277 FED SHARE$ 277 GA. SHARE$
0TH SHARE$

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

1450
1160 710
1000

FLOYD 670830

CLASS I BIKEWAY IN ROME BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00. - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: MEG BRYSON

ROME TIP I 670830
CONG DIST. 7
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996 $ 465

FED SHARE$ 372

GA. SHARE$

0TH SHARE$

93

FLOYD 670880

BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT 16
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
.FED SHARE$
GA. SHARE$ 0TH SHARE$

0 0 1019 815 204

,, ,,,



.

~

~ ~ fll,.,_!'!!.!Ll

...



P..L,Ji!,!

~l.)fJl

~

L,.'.':;.,

~),"""-~'1

/,.(.._ ..,,
I

fE!. .;,;~

1,,-.:~,~

11.,l":.:1;_,

/~tt':~{t:f'/

j , ........... :--:

. '

f I

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 14_1

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

-------------------------- --------------------------------------------------------------------------------------------------------

FORSYTH COUNTY OPERATED PUBLIC TRANSIT SERVICE

1Bl013 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 9

FUNDS RECIPIENT: FORSYTH

OPERATING 1994

$

51

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

30

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

21

FORSYTH 1B1014

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

53

r.

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

31

GA. SHARE$

0TH SHARE$

22

FORSYTH 1B1015

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1996 $

56

FUND SOURCE: RURAL TRANSIT

FED SHARE$

33

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

23

FORSYTH 1C2013

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1994

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

FORSYTH 1C2014

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL-1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

FORSYTH 121690

SR 9 SOUTH OF CUMMING FM SR 141 N TO SR 20 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.80 MANAGER: H. ASHMORE(M)

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AFTER 96
AFTER 96

FORSYTH 121910

RW ON 162010,162014,162018 . FM SR 371 TO ALCOVY RD RIGHTS-OF-WAY/ NEW CONSTRUCTION PROJECT MILEAGE : 25.60 - EXIST. LANES: 0 /PROPOSED LANES: 4 MANAGER: NEIL DAVIS

ATLANTA TIP f R 54 CONG DIST. 9 GRIP PROJECT FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PE NONE ROW 1989 CONST NONE

$

0

UNDERWAY

$

0

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 142

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P. I.NO.

PROJECT DATA

---- ---------- -

---

--

FORSYTH SR 141 FM 0,6 MI NORTH OF FULTON CO LINE TO SR 9

121980 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 6.21

MANAGER: H. ASHMORE(M)

FISCAL

COST

-------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PE 1992 UNDERWAY

CONG DIST. 9

ROW

AFTER 96

CONST

.AFTER 96

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

FORSYTH 122015

SR 306/369 FM SR 400 TO HALL CO LINE/INCL BR@ FOUR MILE CRK RECONSTRUCTION &- WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 9.09 MANAGER: H. ASHMORE(M)

FORSYTH sR 369@ SIX MILE & @ TWO MILE CREEKS 122017 REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .SO MANAGER: H. ASHMORE(M)

FORSYTH SR 20 FM SR 400 TO SAMPLE ROAD/CR 80 122250 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.02
MANAGER: H. ASHMORE(M)
(_

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 122012 IS AN ASSOCIATED PROJECT,

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 122015 IS AN ASSOCIATED PROJECT,

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FORSYTH 122540

SR 400 INSTALL LOGO SIGN PANELS IN FORSYTH COUNTY
SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

FORSYTH 122550

SR 9 AT SR 20 SOUTH OF CUMMING INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

FORSYTH 132390

SR 306 AT SR 369 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .53 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS_

CONG DIST. 9 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST,. 9 FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

21

FED SHARE$

17

GA. SHARE$

4

0TH SHARE$

PE NONE $ ROW 1995 $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

o
1 173 156
17

PE 1994 UNDERWAY

ROW 1994

$

4

CONST 1995 $ 310

FED SHARE$ 279

GA. SHARE$

31

0TH SHARE$

,, ,.

..,



~

. ~ ~ ,, ~~

[G~C~

,=;,= -za.=,

[,:,X:\\i

~/!'{J

121,:.}~1

~
'

f!!'i'~J

~'TifJi

it*-!i!!!i

,::!:;:~:

I'::.:. .......-.,

~-:--"-




GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 143

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FORSYTH SR 20/SR 9/CUMMING@ CS 526; & CR 87

PE NONE $

0

141605 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 9

ROW 1994 $

50

PROJECT MILEAGE : .10 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST 1994 $ 250

MANAGER: L. OWENS

FUND SOURCE: HWY. SAFETY

FED SHARE$ 225

FEDERAL HIGHWAY AOMIN FUNDS

GA. SHARE$

25

0TH SHARE$

FORSYTH 141770

SR 9@ SR 306/CHARLES PLACE IN CUMMING INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .15 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: L. OWENS

CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 150 135 15

FORSYTH 171010

BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT fl
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

(.

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE NONE $ ROW NONE $
CONST 1994 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0 1245
996 249

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 144

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-----------------------------------------------------------------------------------------------------------------------------------

FRANKLIN I-85 SIGN MOD FM DEK CL TO SC STATE LN .. GWIN/JACKS/BARR/BANK

PE NONE $

0

11044W SIGNING/ MAINTENANCE

CONG DIST. 10 & 6

ROW NONE $

0

PROJECT MILEAGE : 76.00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

110440 IS AN ASSOCIATED PROJECT.

0TH SHARE$

FRANKLIN I-85 UPGRADE NB REST AREA f 81
110460 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER:

CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$

39 0
1310 1179
131

FRANKLIN SR 17(@I-85 RECST INTERCHANGE-IM]FM NCL LAVONIA-STEPHENS CL 12Y080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .00
MANAGER: UNKNOWN

CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 122080 IS AN ASSOCIATED PROJECT.

PE 1994

$

0

ROW 1995 $

0

CONST 1996 $ 500

FED SHARE$ 450

GA. SHARE$

50

0TH SHARE$

FRANKLIN SR 106 AT SR 51 141760 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : .30 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS

CONG DIST. 10
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1993 UNDERWAY

CONST 1994 $ 333

FED SHARE$ 300

GA. SHARE$

33

0TH SHARE$

FRANKLIN OVERLAYS FOR 013-0013,089,0089,119-0002,119-0040,139-0004
811045 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: UNKNOWN

CONG DIST. 10 & 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 81Y045 IS AN ASSOCIATED PROJECT.

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 1108 997 111

FRANKLIN OVERLAYS FOR SIX BRIDGES IN DIST 1,7; TO SHOW STP FUNDS 81Y045 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: UNKNOWN
I_

PE NONE $

0

CONG DIST. 10 & 4

ROW NONE $

0

CONST 1994 $ 300

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 240

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

60

811045 IS AN ASSOCIATED PROJECT.

0TH SHARE$

. ,, '

..

~

~ !i~:~ ~-~~~i e_~;Jffi ~ ~ ~ ; ~~r,;::~ r,.:n;,i.,~ 1:01';:,~ w-x,r,r.~ ~ f;< ..,.:, I





GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

Page 145

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

FULTON TRANSIT TRAVELER DEMONSTRATION PROJECT

FISCAL

COST

------------------------.-C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

7D7010 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 5 & 4

FUNDS RECIPIENT: CITY OF ATLANTA

CAPITAL 1994

$ 1875

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$ 1500

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

375

FULTON 707011

NORTH RAIL LINE EXTENSION - MEDICAL CTR TO NORTH SPRINGS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4

CAPITAL 1994

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE.$

50332 40266
10066

FULTON 7D7012

FIXED GUIDEWAY MODERNIZATION PROGRAM TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4

CAPITAL 1994

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

8494 6795
1699

FULTON 707013

PROCURE 100 BUSES AND BUS RELATED FACILITIES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4

CAPITAL 1994

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

26000 20800
5200

FULTON 707015

NORTH LINE EXTENSION - MEDICAL CENTER TO NORTH SPRINGS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4

CAPITAL 1995

$

FUND SOURCE: URBAN TRANSIT DISC,

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

64264 51411
12853

FULTON 7D7016

FIXED GUIDEWAY MODERNIZATION PROGRAM TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4

CAPITAL 1995

$

FUND SOURCE: URBAN TRANSIT DISC,

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

8494 6795
1699

FULTON 707017

PROCUREMENT OF 80 BUSES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4

CAPITAL 1995

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

17600 14080
3520

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 146

- COUNTY
P.I.NO.
F-U-L-T-ON

NORTH

LINE

DESCRIPTION PROJECT DATA
- EXTENSION - MEDICAL

CENTER

TO

NOR-T-H-

FISCAL

COST

SPRINGS-------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

7D7019 TRANSIT PROJECTS/ CAPITAL

CONG DIST, 5 & 4

FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CAPITAL 1996

$ 22564

~UNO -SOURCE: URBAN TRANSIT DISC.

FED SHARE$ 18051

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$ 4513

FULTON 7D7101

FIXED GUIDEWAY MODERNIZATION PROGRAM TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIS_T. 5 & 4

CAPITAL 1996

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA, SHARE$

0TH SHARE$

8494 6795
1699

FULTON 7D7121

PUBLIC TRANSIT SERVICE FOR FULTON AND DEKALB COUNTIES TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

11232 5616
5616

FULTON 7D7132

CAP. MAINT., RAIL CAA- OVERHAUL, BUS PURCHASES, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT:- MARTA MANAGER: STEVE KISH

CONG DIST; 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1994

$

FED SHARE$

GA, SHARE$

0TH SHARE$

30570 24456
6114

FULTON 7D7143

PUBLIC TRANSIT SERVICE FOR FULTON AND DEKALB COUNTIES TRANSIT PROJECTS/ -OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DiST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

10344 5172
5172

FULTON 7D7154

LINE REHAB. /RENOV., RAIL CAA OVERHALL, CAP_. MAI NT., ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

29976 23981
5995

FULTON 7D7165

PUBLIC TRANSIT SERVICE FOR FULTON AND DEKALB COUNTIES TRANSIT.PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

10344 5172
5172

,, .

,. I



~-.

~~

~

=cn.,.-,;.::;;.,":J

= =

e:t~g~ = ~[I!

~~.~':-~;.; 11i.!/:l;t'~ ~,:.'[ft;~ ~.::.1:i,:7:!i ~ ~ ,~i.;;!!f?;~ i,,,~-,,,,,

. '

I

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep~l993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 147

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

------ ---------------- - -------

------------------- (-----------------C-O-M-M--EN-T-S---------------------------Y-E-A-R---------E-S-T-S--

FULTON RAIL CAR OVERHAUL, BUS PURCHASES, CAP. MAINT., ETC.

707176 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 5 & 4

FUNDS RECIPIENT: MARTA

CAPITAL 1996

$ 29976

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT

FED SHARE$ 23981

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$ 5995

FULTON 707501

REGIONAL, FINANCIAL AND SHORT RANGE PLANNING SPECIAL STUDIES/ PLANNING FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PLANNING 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

1600 1280
320

FULTON 707502

REGIONAL, FINANCIAL AND SHORT RANGE PLANNING
SPECIAL STUDIES/ PLANNING FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PLANNING 1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

1600 1280
320

FULTON 707503

REGIONAL, FINANCIAL AND SHORT RANGE PLANNING SPECIAL STUDIES/ PLANNING FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PLANNING 1996

$

FED SHARE$

GA. SHARE $

0TH SHARE$

1600 1280
320

FULTON 7Vl025

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY
MANAGER: STEVE KISH .

CONG DIST. 5

CAPITAL 1994

$ 127

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 102

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

12

0TH SHARE$

13

FULTON 7Vl026

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

TRANSIT PROJECTS/ CAPITAL

.

FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY

MANAGER: STEVE KISH

CONG DIST. 5

CAPITAL 1995

$ 131

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

105

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

13

0TH SHARE$

13

FULTON 7V1027

.ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY
MANAGER: STEVE KISH

CONG DIST. 5

CAPITAL 1996

$ 136

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 109

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

13

0TH SHARE$

14

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 148

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-FULTON
31171Z

CALL BOXES ON I-85 UNKNOWN/ UNKNOWN

FM

ALABAMA

TO

SR

- 74/FULTON ... SEE

HA-R-R-IS------------------------------------------------P-E--1-9-9-4-----$------0

CONG I;>IST. 1 & 3

ROW NONE $

0

PROJECT MILEAGE: .00 - EXIST, LANES: 0 /PROPOSED LANES: 0

CONST 1996 $

0

MANAGER:

FUND SOU~CE: I-STATE HAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

FULTON 320H94

LUMP SUM FOR HOV CONGESTION MITIGATION WORK

MISCELLANEOUS IMPROVEMENTS/ TRAFFIC

1.

PROJECT MILEAGE ,OO - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

ATLANTA TIP t R 174
CONG DIST: 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADHIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0
10000 8000 2000

FULTON 712360

I-285@ WASHINGTON RD/INCL WON WASHINGTO RO 600' W OF BR INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .51 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: BILL MOSKAL

ATLANTA TIP t FS 17
CONG DIST. 5
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1988 UNDERWAY ROW 1991 UNDERWAY CONST 1996 $ 1651
FED SHARE $ 1486 GA. SHARE $ 165 0TH SHARE $

FULTON 712850

I-85 STAGE 2 PAVING FM I-75 TO I-285/ALSO DEKALB

ATLANTA TIP t R 109

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 4 & 5

PROJECT MILEAGE: 10.90 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

FUND SOURCE: I-STATE CONST.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
4233 3810
423

FULTON 712920

I-20: FROM I-285 EAST TO WINDSOR ST
LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 6.34 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E. LAWS

ATLANTA TIP t R 124
CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1994 $ 2000

FED SHARE $ 1600

GA. SHARE $ 400

0TH SHARE $

FULTON 712940

I-75@ HT PARAN ROAD INTERCHANGE/ TRAFFIC PROJECT MILEAGE : .30 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS

ATLANTA TIP t R 105
CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 2200

FED SHARE $ 1760

GA. SHARE $

440

0TH SHARE $

FULTON 712950

I-85@ MONROE DRIVE INTERCHANGE/ TRAFFIC PROJECT MILEAGE : .30 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS

ATLANTA TIP .t R 106 CONG DIST. 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1995 $

50

CONST 1996

$ 2200

FED SHARE $ 1760

GA. SHARE $ 440

0TH SHARE $

. . ,,

I..

,.. ,. '

=== mrn~~ . ~ ~ ~ =~ =~ B!I)~

~

~.,.~:~ti! h~~~ ~:if,:';;~ f.\:!iC;f.' ~~ii r::~:,--:,_,~

.. .,.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 149

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON I-BS SB, REPLACE IMPACT ATTENTUATOR

ATLANTA TIP f R 140

PE 1993 UNDERWAY

712960 IMPACT ATTENTUATORS / TRAFFIC

CONG DIST. 5 & 4

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4

CONST 1994 $

35

MANAGER: BURT RIDDLE

FUND SOURCE: I-STATE MAINT.

FED SHARE$

35

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

FULTON 712965

I-20 WB & I-85 SB REPLACE IMPACT ATTENUATORS IMPACT ATTENTUATORS / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: BURT RIDDLE
(

ATLANTA TIP f R 140 CONG DIST. 5 & 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1994

$

155

FED SHARE$

155

GA. SHARE $

0TH SHARE$

FULTON 71297Z

HOV LN SIGNING ON I-75 & I-BS METRO/CLAYTON;COBB;GWINNETT HOV LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

ATLANTA TIP f R 73

PE 1994

$

0

CONG DIST. 5

ROW NONE $

0

CONST 1995 $

0

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

712970 IS AN ASSOCIATED PROJECT.

0TH SHARE$

FULTON 7129BO

I-20 FM BOULEVARD EAST TO I-2B5 INCL I-2B5 INTERCHANGE LANDSCAPING/ MAINTENANCE PROJECT MILEAGE : 8.93 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BEN BUCHAN

ATLANTA TIP f DK-R 137 CONG DIST. 4 & 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 3000

FED SHARE$ 2400

GA. SHARE$ 600

0TH SHARE$

FULTON 713010

I-20 PAVEMENT MARKINGS FRM MP 50.6 TO 55.9 PVMNT MARKINGS/ TRAFFIC PROJECT MILEAGE : 5.30 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP f AT-R 155 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

67

FED SHARE$

67

GA. SHARE$

0TH SHARE$

FULTON 71302X

I-20 FM W OF SIX FLAGS DR TOW OF SR 2BO/SEE COBB
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP f AT-R 154

PE NONE $

0

CONG DIST. 5

ROW NONE $

0

CONST 1994

$

0

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

713020 IS AN ASSOCIATED PROJECT.

0TH _SHARE $

FULTON 7130B5

I-20 WB 61 SIGNS FROM I-75 TO COBB COUNTY LINE
SIGNING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK

ATLANTA TIP f R 130 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

363

FED SHARE$

363

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 150

COUNTY

DESCRIPTION

P. I.NO.

PROJECT DATA

--------- --- - FULTON I-285 WESTSIDE . 52 SIGNS, NB FROM I-20 TO I-75 .. COBB

713095 SIGNING/ MAINTENANCE

PROJECT MILEAGE : .00 - EXIST: LANES: 0 /PROPOSED LANES: 0

MANAGER:. BURT RIDDLE

FISCAL

COST

----A-T-L-A-N-T-AC-O-M-T-MIP-E-N-fT-S-R--1-3-0---------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--0

CONG DIST. 5

ROW NONE $

0

CONST 1994

$

230

FUND SOURCE: !~STATE MAINT.

FED SHARE$ 230

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

71309X IS AN ASSOCIATED PROJECT.

0TH SHARE$

FULTON I-85 NB 62 SIGNS FROM I-285 TO SR 166 LAKEWOOD FWY .. CLAYTON

ATLANTA TIP f R 130

PE NONE $

0

71309Z SIGNING/ MAINTENANCE

CONG DIST. 5

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

713090 IS AN ASSOCIATED PROJECT.

0TH SHARE$

FULTON 713125

14 VARIABLE MESSAGE SIGNS, 2 PER FREEWAY INT WITH I-285 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
(.

ATLANTA TIP f R 166 CONG DIST. 5 -
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 4700 3760
940

FULTON 713130

SIGN UPGRADING I-285 WEST FROM I-20 TO I-75 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP f R 130
CONG DIST. 5 & 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 1000 1000

FULTON 713135

COMMUNICATION CONDUIT & CABLE ON DOWNTOWN CONNECTOR MISCELLANEOUS IMPROVEMENTS/ TRAFFIC
PROJECT MILEAGE : 7.00 - EXIST. LANES: o /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

ATLANTA TIP f R 167 CONG DIST. 5 .
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 5600 4480 1120

FULTON 713140

COMMUNICATION CABLE ON I-85 FM I-75 NORTH TO I-285 MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE: 10.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

ATLANTA TIP f R 168 CONG DIST. 4 & 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$
0TH SHARE$

0 0 2700 2160 540

FULTON 713145

COMMUNICATION CABLE ON I-75 FROM I-85 NORTH TO I-285 MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : 5.00 - EXIST. LANES: 0 /PROPOSED.LANES: 0
MANAGER: BURT RIDDLE

ATLANTA TIP f R 169 CONG DIST. 5 & 6
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 1300
1040 260

.

. ...

~

~

~

ee::xt

= ~

= ~

t,,~i~ta

~:,;:tm

-i;r.~

... Ir!~~~-$ ~J~~

= ~

ili~n:11

f*b!

f!.,..,"',,,,~a:.~

~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 151

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON COMMUNICATION CABLE ON I-75 FROM I-285 NORTH TO I-85

ATLANTA TIP f R 170

PE NONE $

0

713150 MISCELLANEOUS IMPROVEMENTS/ TRAFFIC

CONG DIST. 5

ROW NONE $

0

PROJECT MILEAGE : 6.00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $ 2100

MANAGER: BURT RIDDLE

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE$ 1680

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 420

0TH SHARE$

FULTON 713170

BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 7 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

ATLANTA TIP f R 131 CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 1244 1120 124

FULTON 713180

BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 7 (TII ONLY) BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP t R 131
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 . $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1013 912 101

FULTON 713190

BRIDGE PAINTING PROJECT FOR FY 1994 - ATLANTA AREA
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN C

ATLANTA TIP f R 131 CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 1629 1466
163

FULTON 72012X

N'SIDE PKWY@ CHATTAHOOCHEE RVR INCL APPR/SEE COBB CO REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .00 MANAGER: BEN BUCHAN

ATLANTA TIP t AT12/C024
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 720125 IS AN ASSOCIATED PROJECT.

PE 1981 ROW 1985 CONST

UNDERWAY UNDERWAY.
AFTER 96

FULTON 720570

BANKHEAD HWY/SR 8 FM PROCTOR CRK TO .E OF SCL RR BRIDGE RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .44 MANAGER: BILL MOSKAL (M)

ATLANTA TIP f AT 4 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FULTON 720980

.SR 138/ RELOC FM 5 LN@ BETHSAIDA RD TO SR 279/0'NATL HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2.87 MANAGER: D. GODWIN

ATLANTA TIP f FS 12 CONG DIST. 6
F~ND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW 1990 UNDERWAY

CONST 1996 $ 6616

FED SHARE $ 5293

GA. SHARE $ 1323

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 152

COUNTY

DESCRIPTION

------ - - - - - - P.I.NO.

PROJECT DATA

FULTON STATE BRIDGE RD FM ALPHA CT/SR 400 TO PARK BR PKWY

720990 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 2.14

MANAGER: NEIL DAVIS

-- ------------CO-M--M-E-N-T-S-----------------"---------F-IYS-ECA-A-R-L-------EC-SO-TS-TS--

ATLANTA TIP f. FN 15

PE NONE

$

0

CONG DIST. 6

ROW 1992

UNDERWAY

CONST 1996

$ 8998

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 7198

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1800

0TH SHARE $

FULTON 721000

SR 120 FM PARK BR PKWY TO PEACHTREE IND BLVD/GWINNETT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 6.54 MANAGER: NEIL DAVIS (M)

ATLANTA TIP f RTP-FN 3
CON~ DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE ROW 1991 CONST

$

0

UNDERWAY

AFTER 96

FULTON 721010

SR 9/ROSWELL FM DUNWOODY PLACE TON/SR 120 RECONSTRUCTION & WIDENING FROM 3 LANES TO 4 LANES.
PROJECT MILEAGE : 1.78 MANAGER: RAY METTS (M)

ATLANTA TIP f FN 7 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FULTON 721300

SR 140/HOUZE RD FM MANSELL RD NORT.H TO NEAR RANCHETTE RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 4.55 MANAGER: RAY METTS (M)

ATLANTA TIP I FN 62
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FULTON 721305

SR 140/HOUZE RD FM RANCHETTE RD TO CR 311/CHEROKEE CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.25 MANAGER: RAY METTS (M)

ATLANTA TIP I FN 13
CONG DIST. 6
FUND. SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 "AFTER 96

FULTON 721308

SR 140/HOUZE RD@ LITTLE RIVER@ CHEROKEE CO LINE REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .OS
MANAGER: RAY METTS (M)

FULTON 721410

SR 166/CAMPBELLTON RD/ATLANTA FM ENON RD EAST TO BARGE RD RECONSTRUCTION& WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.80 MANAGER: G. ROSS (M)

{.

ATLANTA TIP I FN 13
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72130Z IS AN ASSOCIATED PROJECT.
ATLANTA TIP f AT,~2 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1991 ROW LOCL CONST

UNDERWAY AFTER 96

PE 1992 ROW
CO~ST

UNDERWAY AFTER 96 AFTER. 9,6

..





~

~

~

~.']

~e

~Y~~Jlli

!1~~~~t:r!

t!ll'~:~

Mill"'..!?;,

(.i,1;,.r,~i.,.,

~~


~~~

H~.;..:;:t:1ri;

I.... --~.

.. .'

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 153

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

FULTON SR 9@ C'HOOCHEE RVR/INCL INT @AZALEA & RIVERSIDE/& SIGNALS

ATLANTA TIP f FN 7

PE 1993

UNDERWAY

721460 REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 8 LANES.

CONG DIST. 6

ROW 1996

$ 1473

PROJECT MILEAGE : .29

CONST

AFTER 96

MANAGER: RAY METTS (M)

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

72Y460 IS AN ASSOCIATED PROJECT.

FULTON 721510

SR 120/ALPHARETTA FM SR 9/MAIN ST.EASTERLY TO SR 400 RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES. PROJECT MILEAGE : 1.33 MANAGER: NEIL DAVIS (C).

ATLANTA TIP f FN 16
CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$ 3760

CONST 1996

$ 3900

FED SHARE $ 3120

GA. SHARE $

7'80

0TH SHARE $

FULTON 721560

SR 14/US 29 FM SR 154 NEAR N CL/PALMETTO TO SR 74/FAIRBURN RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 4.60 MANAGER: D. GODWIN

ATLANTA TIP f FS 31 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW 1992

UNDERWAY

CONST 1996

$ 5064

FED SHARE $ 4051

GA. SHARE $ 1013

0TH SHARE $

FULTON 721570

SR 14 1-WAY PAIR/PALMETTO FM S CTY LMTS TO SR 154 NEAR N C.L RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.60 MANAGER: RON BRAZIEL (M)

ATLANTA TIP f FS 50 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FULTON 721700

CSX RR BRIDGE OVER SR 3/NORTHSIDE DR
BRIDGES/ REPLACEMENT PROJECT MILEAGE : .20 MANAGER: G. ROSS (M)

ATLANTA TIP f AT 73 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW NONE CONST

$

200

$

0

AFTER 96

FULTON 721710

SR 3/NORTHSIDE DR FM TRABERT AVE TO I-75 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .63 MANAGER: G. ROSS (M)

ATLANTA TIP f AT 30 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$

72

AFTER 96

AFTER 96

FULTON 721720

NORFOLK SOUTHERN RR OVER SR 3/NORTHSIDE DR BRIDGES/ REPLACEMENT PROJECT MILEAGE : .20 MANAGER: G. ROSS (M)

ATLANTA TIP t AT 74
CO~G DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW NONE CONST

$

200

$

0

AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993Page 154

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO,

PROJECT DATA

------------------------- ---------

--------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--

FULTON SR 3/NORTHSIDE DR FM 14TH ST TO TRABERT AVE

ATLANTA TIP f AT 30

PE 1996

$

91

721730 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.

CONG DIST. 5

ROW

AFTER 96

PROJECT MILEAGE: .55

CONST

AFTER 96

MANAGER: G. ROSS (M)

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADHIN FUNDS

FULTON 721750

SR 3/NORTHSIDE DR@ BANKHEAD HWY; @ NORTH AVE;@ MARIETTA ST. .INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE : .75 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: G. ROSS
r.

FULTON 72177X

SR 166 FM OLD LOWER RIVER RD TO SR 70 . SEE DOUGLAS CO UNKNOWN / UNKNOWN .. PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: G. ROSS (M)

FULTON 721780

SR 9/N MAIN ST FM ACADEMY ST TO WINDWARD PKWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.97 MANAGER: NEIL DAVIS (CM)

ATLANTA TIP f AT 76 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DO 19 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 721770 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f FN 67
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1993

UNDERWAY

ROW 1994

$ 1430

CONST 1995

$. 1130

FED SHARE $

904

GA. SHARE $

226

0TH SHARE $

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FULTON 72'1790

SR 9/S MAIN ST FM UPPER HAHBREE RD TO ACADEMY ST RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 1.70 MANAGER: NEIL DAVIS (CH)

ATLANTA TIP f FN 67 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FULTON 721810

SR 166/LAKEWOOD FWY@ GREENBRIAR PKWY/CAMPBELLTON RD ML9.37 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .84 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. CHURCH (H)

ATLANTA TIP f .AT 62 CO!"G DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AI>MIN FUNDS

PE 1995 ROW CONST

$ 198 AFTER 96 AFTER 96'

FULTON 721835

FREEDOM PARKWAY/SR 10: ICE CANOPY AT THE WSB TOWER BRIDGES/ NEW CONSTRUCTION PROJECT. MILEAGE :, .12 MANAGER: NEIL DAVIS

ATLANTA TIP f AT-R 41
CONG DIST, 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY .ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST1994

$.-2117

FED SHARE$ 1694

GA. SHARE$ 423

OTH- SHARE$

.

...

.. ,..

~

~

~.J

~JK... !I

Iw:~

~;:';f,i

~;4;}~

~;n:i!!l

ffilH~D$

u.~as);)~,,., c~~.jJ!i

l:ilK'J#i

tii~:u??i

/;_::;' -~~"i~~

1:,--:





GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 155

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P .I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

F-U-L-T-O-N----F-R-E-E-D-O-M--P-K-W--Y-/S-R---1-0--FM---I--7--5-/I---8-5---TO---M-O-R-E-LA-N--D--A-V-E--&--P-.D--.-L-----------A-T-LA--N-T-A--T-I-P--f--A-T---R--4-1-------------------P-E--N-O-N-E-----$------o

721840 LANDSCAPING/ ENHANCEMENT

CONG DIST. 5

ROW NONE $

0

PROJECT MILEAGE : 2.00 - EXIST. LANES: 4 /PROPOSED LANES: 4

CONST 1996

$ 2000

MANAGER: NEIL DAVIS

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$ 1600

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

400

0TH SHARE$

FULTON 721850

SR 400@ HAMMOND DR AND ABERNATHY ROAD, CD SYSTEM INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.75 - EXIST, LANES: 8 /PROPOSED LANES: 14 MANAGER:. NEIL DAVIS (CM)

ATLANTA TIP.f FN-R 100 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1995 CONST

UNDERWAY $ 4000 AFTER 96

FULTON 721910

SOUTH FULTON PKWY PAVING FOR LANES 3 & 4 FM SR 154 TO SR 92

CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 4,30

C.

MANAGER: G. ROSS

FULTON 721920

SR 140/HOLCOMB BRIDGE RO BETWEEN BARNWELL RD & NESBITT FERRY TURN LANES/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

FULTON 721930

SR 120 AT STATE BRIDGE ROAD TURN LANES/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

FULTON 72Y460

SHOWN FOR SAFETY FUNDS ONLY ... SEE 721460
UNKNOWN/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M GANNAWAY

FULTON 72Y510

SR 120/ALPHARETTA FM SR 9 TO SR 400; FOR REST R/W $; 721510 RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES. PROJECT MILEAGE : 1.33 MANAGER:

ATLANTA TIP t FS 36
CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FN 87 CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FN 48 CONG DIST. 6 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FN 7 CONG DIST. 6 FUND SOURCE: NAT'L HIGHWAY FEDERAL .HIGHWAY ADMIN FUNDS 721460 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f FN 16 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 3000 2400
600

PE 1994

$

10

ROW 1995 $

10

CONST 1996

$

347

FED SHARE$

312

GA. SHARE$

35

0TH SHARE$

PE NONE $

0

ROW 1995 $

10

CONST 1996 $ 156

FED SHARE$

140

GA. SHARE$

16

0TH SHARE$

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

PE NONE ROW 1995 CONST NONE

$

0

$ 3000

$

0

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 156

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

-------------------- ---- ---

- ------ --------------------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--

FULTON PARTIAL R/W FOR 721850

ATLANTA TIP f FN-R 100

PE NONE

$

0

72Y850 UNKNOWN/ UNKNOWN

CONG DIST. _5

ROW 1996

$ 4850

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE

$

0

MANAGER: -

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN. FUNDS

FULTON 730753

SOUTH FULTON PKWY FM COCHRAN MILL RD TO SR 154 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: G. ROSS

FULTON 730880

STATE BR RD FM MEDLOCK BR RD NW TO JONES BR RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.59 MANAGER: NEIL DAVIS (M)

ATLANTA TIP f FS 36 _CONG _DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FN 48 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

4600 3680
920

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

FULTON 730885

STATE BRIDGE RD@ JOHN'S CRK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .01 MANAGER: NEIL DAVIS

FULTON 730890

SR 70@ WHITE OAK;BEAR & PEA CREEKS

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .70

MANAGER: O. GODWIN

(,

FULTON 730940

CR 1323/HOPEWELL RD@ CHICKEN CREEK TRIBUTARY

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES.

PROJECT MILEAGE : .20

.

MANAGER: O. GODWIN

FULTON 730960

CR 1374/BUTNER RD@ DEEP CREEK EAST OF SR 92 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ~19 MANAGER: D. GODWIN

ATLANTA TIP f FN 71 CONG DIST. 6 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FS 61 CONG DIST. 5. FUND SOURCE: BRIDGE PROGRAM FEDERAL-HIGHWAY ,ADMIN FUNDS
ATLANTA TIP f FN 72 CONG DIST._ 6 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP IFS 62 .CONG DIST_. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

_CONST 1996

$

288

FED SHARE$ 230

GA. SHARE$

58

0TH SHARE$

PE 1990 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$ 1412

FED SHARE$ 1130

GA. llHARE $ 282

0TH SHARE$

PE 1991

UNDERWAY

ROW LOCL

CONST 1994

$

146

FED-SHARE$

117

GA. SHARE $ - 29

0TH SHARE$

PE 1993

UNDERWAY

ROW LOCL

CONST 1996

$

332

FED SHARE$

266

GA. SHARE$

66

0TH SHARE$

...

~

== ~ ~ ~ ~\lflf.,!

ID:+~~

~it~

~
!C,7-1'-:::,'.3

l'!!:.'!!;.,ij,,. tl:!K;..~

16"~!0\<::f!

~'ry.'r.:;:~~

fr.f~."'>~?

~~;'/'~~~~

.. i~r~

..,

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 157

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.N--O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON SR 166/CAMBELLTON RD FM FULTON IND BLVD TO CR 492iWALLACE RD

ATLANTA TIP f FS 27

PE 1992 UNDERWAY

730990 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 5

ROW

AFTER 96

PROJECT MILEAGE : 2.99

CONST

AFTER 96

MANAGER: G. ROSS (M)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY AOMIN FUNDS

FULTON 731420

SR 120/ABBOTTS BRIDGE RO@ JONES BRIDGE RD TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER:

FULTON 731430

STATE BRIDGE ROAD FM ALPHA COURT TO PARK BRIDGE PARKWAY LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 2.34 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: NEIL DAVIS

FULTON 742492

SR 166/LAKEWOOD FWY EB EXIT RAMP@ SYLVAN RD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .19 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GODWIN

FULTON 742700

SR 120 FM 950' NW BOLES RO TO 950' S/BOLES RO/CR 72
TURN LANES/ TRAFFIC PROJECT MILEAGE : .32 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN

FULTON 74290X

LOWER RIVER RD FM SR 92/FAIRBURN RO TO COBB CO LINE/DOUGLAS
UNKNOWN/ UNKNOWN PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

(.

FULTON 750455

TECHWOOO OR EXTEN FM CHAPEL ST TO SPRING ST. "CITY" CONSTRUCTION OF NEW ROUTE WITH 3 LANES PROPOSED,
PROJECT MILEAGE : .40 MANAGER: BEN BUCHAN

ATLANTA TIP f FN 3 CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
ATLANTA TIP f FN 15 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f AT-Rll6 CONG DIST. 5 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FN 70 CONG DIST. 6 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
ATLANTA TIP f DO 21 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 742900 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f R 6 CONG ~IST. 5 FUND SOURCE: I-STATE CONST. FEDERAL HIGHWAY ADMIN FUNDS 751900 IS AN ASSOCIATED PROJECT.

PE 1994 $

19

ROW 1995 $

10

CONST 1996 $ 406

FED SHARE$ 365

GA. SHARE$

41

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1996 $ 298

FED SHARE$ 230

GA. SHARE$

59

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1995 $ 143

FED SHARE$ 129

GA. SHARE $

14

0TH SHARE$

PE NONE $

0

ROW LOCL

CONST 1994 $ 280

FED SHARE$ 252

GA. SHARE$

28

0TH SHARE$

PE 1996 ROW LOCL CONST

$

0

AFTER ~6

PE 1992 UNDERWAY ROW 1994 $ 1799 CONST 1994 $ 13065
FED SHARE $ 11105 GA. SHARE $ 6241 0TH SHARE $ 9201

r
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 158

COUNTY

DESCRIPTION

----P. I.NO.

--

PROJECT DATA
-

- -------

FULTON BANKHEAD HWY/SR 8 FM HARWELL RD TO SR 280/HIGHTOWER RD

750780 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 1.25

MANAGER: D. SMITH (M)

FISCAL

COST

COMMENTS
--------------------------------------.

----------Y-EA-R---------E-S-T-S--

ATLANTA TIP I AT 1

PE 1995

$

100

CONG DIST, 5 .

ROW 1995

$

300

CONST

AFTER 96

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

FULTON 751030

HERSCHELL RD/COLLEGE PARK@ CAMP CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .10 MANAGER: D. GODWIN

ATLANT~ TIP f FS 67 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1988 ROW LOCL CONST

UNDERWAY AFTER 96

FULTON 751090

CLEVELAND AVE FM STEELE NR I-75 TO JONESBORO RD MISCELLANEOUS IMPROVEMENTS/ RECST. OR REHAB.
PROJECT MILEAGE : 1.80 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: G. ROSS ..

ATLANTA TIP I RTP D -AT16
CONG DIST; 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FULTON 751100

CLEVELAND AVE EXTENSION FM JONESBORO RD TO MORELAND AVE CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : __ 90 MANAGER: G, ROSS

ATLANTA TIP I RTP D ~AT15 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 ROW 1992 CONST

UNDERWAY UNDERWAY AFTER 96

FULTON 751130

CLEVELAND AVE FM SYLVAN RD TO I-85 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : ,40 MANAGER: G, ROSS

FULTON 751140

WASHINGTON RD/E.POINT FM DELOWE DR TO LEGION WAY RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : .90 MANAGER: BILL MOSKAL

ATLANTA TIP f AT 18 CONG DIST. 5
FUND SOURCE: I-STATE CONST. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f FS 25 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW 1992

UNDERWAY

CONST 1994

$ 1022

FED SHARE $

869

GA. SHARE $. 153

. 0TH SHARE $

PE 1996 ROW LOCL CONST

$

100

AFTER 96

FULTON 751146

WASHINGTON RD/E POINT FM I-285 TO DESERT DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .BO MANAGER: BILL MOSKAL (CM

ATLANTA TIP I F_S, 17 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY -!'J)MIN FUNDS

PE 1996 ROW LOCL CONST

$

100

AFTER 96

~

..

a!!!)

~

~

~

~

~

~I.~~il

~~

~

~~~;~ ,,. tr::~~11

r.:e.:.'i~

jilfa~,iii

/;'.J'.'.,:i/i!!

v:~~~y.~:~

!~...,,.,,ii
.

. !-:-.. ,,,__J, ,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 159

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

F-UP-L-.T-IO.-NN-O--. --ST-A-T-E--B--R-ID-G-E--R-DP-R-OF-M-JE-C-STT-A--TDE-A-TA-B-R-ID-G--E--W-A-Y--T-O--JO-N--E-S--B-R-ID-G--E--R-D------------A-T-LA--N-T-AC-O-MT-MI-PE-N-fT-S-FN---4-8---------------------P-EY-E-A1-R9-9-6-----$-E-S-T-S-1-01

751410 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 6

ROW LOCL

PROJECT MILEAGE : 1.52 MANAGER: NEIL DAVIS

r.

FUND _SOURCE: SURFACE TRANSPORT.

CONST

AFTER 96

FEDERAL HIGHWAY ADMIN FUNDS

FULTON 75143X

FRNTG RD 1-WY PAIR FM ROTTENWOOD CK TO NORTHSIDE DR/COBB
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 ./PROPOSED LANES: 0
MANAGER: D. SMITH (M)

FULTON 751555

RIVERSIDE RO/ROSWELL@ BIG CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .25 MANAGER: RAY METTS (M)

FULTON 751560

HOWELL MILL RD/ATLANTA FM OLD CHATTAHOOCHEE TO BELLMEADE AVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: D. CHURCH (M)

ATLANTA TIP f CO-R 67 CONG DIST. 6
ruNO SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 751430 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f FN 26 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDER.AL HIGHWAY ADMIN FUNDS 721460 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f AT 26 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

PE 1996 ROW LOCL CONST

$

9

AFTER 96

FULTON 751900

SR 14/US 29/PETERS ST@ L&N AND C OF G RR APPR. l MI N/I-20 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES. PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN

FULTON 751990

SR 166/CAMBELLTON RO FM CR 482 TO ENON RO/CR 485 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.95 MANAGER: G. ROSS (M)

ATLANTA TIP f AT 71 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 750455 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f FS 27 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDER.AL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1994

$ 3729

FED SHARE $ 2983

GA. SHARE $ 746

0TH SHARE $

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

FULTON 752010

COURTLAND ST OVER DECATUR ST REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .10 MANAGER: BEN BUCHAN

ATLANTA TIP f AT 70 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDER.AL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$

337

FED SHARE$ 270

GA, SHARE$

67

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 160

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

F-U-L-T-O-N-----C-O-U-R-T-LA-N-D---S-T--OVER-C--SX---R-R----

-----------------------------------A-T-L-A-N-T-AC-O-MT-MI-PE-N-fT-S-A-T--7-0---------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S-- 0

752015 REPLACEMEN.T OF THE EXISTING BRIDGES (S). NO ADDED LANES.

CONG DIST. s

ROW LOCL

PROJECT MILEAGE : .10

CONST 1994

$

685

MANAGER: BEN BUCHAN

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 548

FEDERAL HIGHWAY AD~IN FUNDS

GA, SHARE$

137

0TH SHARE$

FULTON 752020

PEACHTREE ST@ GEORGIA RR & MARTA AT UNDERGROUND ATLANTA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN
r..

FULTON 752030

INTERNATIONAL BLVD@ CSX & NORFOLK-SOUTHERN RR@ THE OMNI REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : 50 MANAGER: BEN BUCHAN

ATLANTA TIP f AT 69 CONG DIST . 5 .'
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
-c
ATLANTA TIP f AT 68 CONG DIST:-s
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW LOCL

CONST 1995 $ 1650

FED SHARE$ 1320

GA. SHARE $

330

0TH SHARE$

PE 1993

UNDERWAY

ROW LOCL

CONST 1995 $ 1580

FED SHARE$ 1264

GA. SHARE$

316

0TH SHARE$

FULTON 752040

ROXBORO RD FM E PACES FERRY RD TO ROCKHAVEN CIR & SOU RR BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : .20
MANAGER: NEIL DAVIS (CM)

ATLANTA TIP f AT 9 CONG DIST. _4 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

50

AFTER 96

FULTON 752050

HAYNES BR RD/CR 1334 FM 1000' N/SR 400 NW TO SR 120

RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES.

PROJECT MILEAGE : 1_.04

.

MANAGER: NEIL DAVIS (C)

FULTON 752070

SR 139@ FAIRBURN RD;LYNHURST DR;FM FLORIDA AV TO BARFIELD INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE : .SO - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GODWIN

FULTON 752080

PIEDMONT AVE: CSX RR BRIDGE & RETAINING WALLS TO BUTLER ST.
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .SO MANAGER: BEN BUCHAN

ATLANTA TIP f FN 12

CONG DIST. 6

..

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW LOCL

CONST 1994 $ 3500

FED .SHARE$ 2800

GA. SHARE$ 700

0TH SHARE$

ATLANTA TIP f AT 79 CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

1000 800 200.

ATLANTA TIP f AT 82
CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995

$ 2104

FED SHARE$ 1683

GA. SHARE$

421.

0TH SHARE$

'"-

..

== ~ ~ ~

,.

~
ci:m=

= =

== = . R.!l= ~~M'.~

., l~fR?~~ et\~:.~ Ji~;.~ B!~;,.itf~1 r;:.~.,~~ :-::'".-:, .i,.-

.,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 161

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON CENTRAL AVENUE OVER CSX RAILROAD

ATLANTA TIP f AT 85

PE 1993 UNDERWAY

752082 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.

CONG DIST. 5

ROW LOCL

PROJECT MILEAGE : .50

CONST 1995

$

755

MANAGER: BEN BUCHAN

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

604

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

151

0TH SHARE$

FULTON 752084

TECHWOOD DR OVER CSX RAILROAD & NORFOLK-SOUTHERN RAILWAY REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN

ATLANTA TIP f AT 87 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1994

$

843

FED SHARE$

674

GA. SHARE$

169

0TH SHARE$

FULTON 752086

SPRING STREET OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN
[

ATLANTA TIP f AT 86 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW LOCL

CONST 1994

$

843

FED SHARE$

674

GA. SHARE$

169

0TH SHARE$

FULTON 752090

ROXBORO ROAD FROM PRITCHART WAY TO EAST PACES FERRY RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .32 MANAGER: NEIL DAVIS (M)

ATLANTA TIP t AT 9
CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993
ROW LOCL CONST

UNDERWAY AFTER 96

FULTON 752130

AUBURN AVENUE PEDESTRIAN SYSTEM FM PARK PL TO BOULEVARD BICYCLE/PED. FACILITY/ OTHER PROJECT MILEAGE : 1.20 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G, BOULINEAU

FULTON 752140

PEACHTREE ST PEDESTRIAN SYSTEM FM MEMORIAL DR TO PINE ST BICYCLE/PED. FACILITY/ OTHER PROJECT MILEAGE : 4,70 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: G. BOULINEAU

FULTON 752150

WINDSOR PARKWAY AT NANCY CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .40" MANAGER: D. GODWIN

ATLANTA TIP f AT-R 144 CONG DIST. 5 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f AT-R 143 CONG DIST. 5 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t FN 21 CON.G DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL
ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0 1000
800
200

PE LOCL ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$ 0TH SHARE$

0 5925 4740
1185

PE 1993 UNDERWAY

ROW LOCL

CONST 1995

$

100

FED SHARE$

80

GA. SHARE$

20

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 162

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO,
F-U-L-T-O-N-----G-LE-N-W--O-O-D--A-VE

PROJECT DATA
--------- FROM CONNALLY STREET

TO

H--IL-L---S-T-R-E-E-T-

---------------A--TL-A-N-T-A-CO-M-T-MIP-E-N-fT-S-A-T--5-7---------------------P-EY-E-A1-R9-9-3-----U-NE-DS-ETR-SW--AY

752160 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.

CONG DIST, 5

ROW LOCL

PROJECT MILEAGE : ,20

CONST 1995

$

250

MANAGER: G, ROSS

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

200

FEDERAL' HIGHWAY ADMIN FUNDS

GA, SHARE$

50

0TH SHARE$

FULTON 752230

SR 54/JONESBORO RD. OVER THE SOUTH RIVER IN ATLANTA REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES, PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP f AT 95 CONG DIST-. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW CONST

$

24

AFTER 96

AFTER 96

FULTON 752320

POWERS FERRY RD/CR 300 OVER LONG ISLAND CREEK REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES, PROJECT MILEAGE : ,00
MANAGER:

ATLANTA TIP f FN 85 CONG DIST, 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW LOCL CONST

$

5

AFTER 96

FULTON 762240

BUTLER ST/CS 2051: CSX RAILROAD OVER BUTLER STREET
BRIDGES/ RECST, OR REHAB, PRO.iECT MILEAGE : .SO . MANAGER: 'BEN BUCHAN .

FULTON 770274

CR 593/0LD BILL COOK RD NE OF UNION CITY@ MORNING CRK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PR~JECT MILEAGE : .40 MANAGER: D, GODWIN

FULTON 770276

t
FORSYTH ST/C.S. 203B OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN

FULTON 770277

PRYOR ST/CS 2044 OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN

ATLANTA TIP f AT B4
CON,-G DIST. 5 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWA ADMIN FUNDS
ATLANTA TIP f FS 63 CONG DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t AT BO.
CONG DIST. 5 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY .ADMIN FUNDS
ATLANTA TIP f AT B3 CONG_ DIST. 5_ FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995

$

341

FED SHARE$ 273

GA, SHARE$

68

0TH SHARE$

PE 1995 $

5

ROW LOCL

CONST 199.6

$

112

FED SHARE$

90

GA. SHARE$

22

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1994

$ 1241

FED SHARE$

993

GA. SHARE$ 248

0TH SHARE$

PE 1993 UNDERWAY.

ROW LOCL

CONST 1994

$

562

FED SHARE$

450

GA. _SHARE $ 112

0TH SHARE$

"J
,_

.. ..

~

~

lfl.M

~ ,.

~'ffll

~

~~~al

~1fc:!il

~~9f~~M

.. eK.i~~ ~

~(!ff!!'!!

lf.4~~

~#

~,.;'....... :~

.:,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 163

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

--------------------------------------

-----------------------------------CO-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

FULTON CR 485/ENON ROAD@ CAMP CK TRIB N OF FAIRBURN

ATLANTA TIP f FS 65

PE 1994

UNDERWAY

770278 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 5

ROW LOCL

PROJECT MILEAGE : .20

CONST 1996

$

150

MANAGER: D. GODWIN

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

120

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

30

0TH SHARE$

FULTON 77030X

COMMUTER RAIL STUDY EVAL 12-RAIL CORR IN METRO TO BIBB CO. SPECIAL STUDIES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

ATLANTA TIP f R 133 CONG DIST, 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 770300 IS AN ASSOCIATED PROJECT.

PE 1993 ROW NONE CONST NONE

UNDERWAY

$

0

$

0

FULTON 770310

ATLANTA MULTI-MODAL PASSENGER TERMINAL DESIGN

PRELIMINARY ENGINEERING/ PLANNING

PROJECT MILEAGE : .50 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: J. CHAMBERS

.

ATLANTA TIP f R 120 CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW NONE CONST NONE

$ 7786

$

0

$

0

FULTON 770380

AERIAL SURVEILLANCE FOR INCIDENT MANAGEMENT ATLANTA REGION MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

FULTON 770390

DEVELOPMENT HARDWARE FOR ATMS REGIONAL PROJECT MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

FULTON 770400

TRAFFIC SIGNAL UPGRADES CITY OF ATL. FOR ATMS, 100 INTERSEC
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

FULTON 770401

COMPUTER HWDWARE/SOFTWARE-ATL REGIONAL TRANS MANAGEMENT SYS
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

ATLANTA TIP f R 171 CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

750

FED SHARE$

600

GA. SHARE$

150

0TH SHARE$

ATLANTA TIP t R 98

PE NONE $

0

CONG DIST. 5

ROW NONE $

0

CONST 1994

$

600

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE$ 480

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 120

0TH SHARE$

ATLANTA TIP f R 98 CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 5000
4000 1000

ATLANTA TIP t R 98

PE NONE $

0

CONG DIST. 5

ROW NONE $

0

CONST 1994

$

155

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE$

124

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

31

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 164

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

----- -- --- P. I.NO.
-
FULTON

PROJECT DATA
- TRAFFIC S. IGNAL UPGRADES CITY OF ATL.

FOR ATMS,

135

INTERSE-C-------A-T-L-A-N-T-AC-O-MT--MIP-E-N-IT-SR---98-----------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--0

770402 SIGNALS/ TRAFFIC

CONG DIST. 5

ROW NONE $

0

PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$ 6210

MANAGER: BURT RIDDLE

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE$ 4968

....

FEDERAL HIGHWAY ~MIN FUNDS

GA. SHARE$ 1242

0TH SHARE$

FULTON 770404

ATL TRANS MGMT SYS -MANAGEMENT CENTER & CONTROL CTR HARDWARE EQUIP, PURCHASE/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

ATLANTA TIP f R 98
CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FE]D SHARE$
GA. SHARE ,$
0TH SHARE$

0 0 4000 3200
BOO

FULTON 770405

ATL TRANS MGMT SYS -UPGRADE CITY ATL TRAFFIC OPERATIONS ROOM MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

ATLANTA TIP f R 98

PE NONE . $

0

CONG DIST. 5

ROW NONE $

0

CONST 1994 $ 250

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE$ 200

FEDERAL HIGHWAY ADMIN FUNDS

GA, SHARE$

50

0TH SHARE$

FULTON 770410

DESIGN FOR HOV LANE COMMUTERIDE SHARE PROGRAM HOV LANES/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ATLANTA TIP IR 174 CONG DIST. 5

PE 1994 $

80

ROW NONE $

0

CONST NONE $

0

FUND SOURCE: CONG MIT./AIR QUAL

FEDERAL HIGHWAY ADMIN FUNDS

FULTON 770450

HISTORIC DEPOT RENOVATION IN FAIRBURN MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

FULTON 770490

TRAIL SYSTEM IN ROSWELL BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

FULTON 770510

BICYCLE/PEDESTRIAN/LANDSCAPING IN ALPHARETTA BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ATLANTA TIP IFS 64 CONG DIST, 5 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I FN 80 CONG D~ST. 6 FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I FN 81 CONG DIST. 6 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996 $ 188

FED SHARE$ 150

GA;- SHARE $

0TH SHARE$

38

PE LOCL ROW LOCL CONST 1996 $ 711
FED SHARE $ 569 GA. SHARE$ 0TH SHARE$ 142

PE LOCL ROW LOCL CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

1250 1000
250

..

~ -

~

~

~!I,~

~
"

~

~

~ m:"'-"':Tcl

-CTC.:C,=

-=s.;:_,.a

ffl'.~-~ ft!?:l!:!.ffi
I)

tifJ;'\i~

~-~v

.. ~ . :

t:--'"~'..!i

.. . ~-

,,........ ~.... ,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 165

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O-.----------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FULTON FROM FREEDOM PARKWAY TO GA TECH TO OLYMPIC SITES

ATLANTA TIP f AT 94

PE LOCL

770520 BICYCLE/PED. FACILITY/ ENHANCEMENT

CONG DIST. 5

ROW LOCL

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1995

$

300

MANAGER: UNKNOWN

FUND SOURCE: TRANS. ENHANCE.

FED SHARE$ 240

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

60

FULTON 770540

CAPITOL AVE PEDESTRIAN CORRIDOR FM STADIUM TO GA STATE MARTA BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .90 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

ATLANTA TIP f R 146 CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

5000 4000
1000

FULTON 770545

PEDESTRIAN BRIDGE/CORRIDOR FM OOME/WCC TO FIVE POINTS
BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER: T, DUNAGAN

ATLANTA TIP f R 147 CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

2200 1760
440

FULTON 770550

INTERNATIONAL BLVD PEDESTRIAN CORRIDOR FM wee TO PIEDMONT AV
BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .85 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ATLANTA TIP f R 145 CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

4000 3200
800

FULTON 770555

ATLANTA UNIVERSITY PROMENADE FM WEST ENO TO MLK PRELIMINARY ENGINEERING/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: T. DUNAGAN

ATLANTA TIP f R 148 CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

500

ROW NONE

$

0

CONST NONE $

0

FULTON 770560

BRIDGE PAINTING PROJECT - DISTRICT 7; ALSO 77Y560 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

FULTON 770570

BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 7 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

ATLANTA TIP f R 131 CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 131 CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

263

FED SHARE$ 210

GA. SHARE$

53

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994 -$

600

FED SHARE$ 480

GA. SHARE$ 120

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 166

COUNTY

DESCRIPTION

FISCAL

COST

-- P. I.NO.

PROJECT DATA

F-U-L-T-O-N-----IN-C--ID-E-NT RESPONSE V-E-H-IC-L-E-S-- (5)

------

--------------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

ATLANTA TIP f R 172

PE NONE $

0

770593 VEHICLE PURCHASES/ TRAFFIC

CONG DIST. 5

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

318

MANAGER: BURT RIDDLE

FUND SOURCE.: CONG MIT./AIR QUAL

FED SHARE$ 254

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

64

0TH SHARE$

FULTON 770595

ADDITIONAL INCIDENT MANAGEMENT PROGRAM

MISCELLANEOUS IMPROVEMENTS/ TRAFFIC

PROJECT MILEAGE : .00 - EXIST; LANES: 0 /PROPOSED LANES: 0

MANAGER: BURT RIDDLE

.

ATLANTA TIP t R 173
CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW NONE $ CONST 1996 $ . .FED SHARE $
GA. SHARE$ 0TH SHARE$

0 1000
800 200

FULTON 770597

BICYCLE FACILITIES AT COMMUTER AND HIGH DENSITY AREAS BICYCLE/PED. FACILITY/ OTHER PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE COUSINS

ATLANTA TIP f R 177 CONG DIST. 5

FUND SOURCE: CONG MIT./AIR QUAL

FEDERAL HIGHWAY ADMIN FUNDS

'

'

'

PE LOCL

ROW NONE $

0

CONST 1996 $ 500

FED SHARE$ 400

GA. SHARE$

0TH SHARE$ 100

FULTON 770605

TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN FULTON COUNTY SIGNALS / TRAFFIC
PROJECT MILEAGE : .00 - EXIST. LANES: Q /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

ATLANTA TIP f FN86/FS48 CONG ~IST. 5 & 6 .
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

50

ROW NONE $

0

CONST 1995 $ 460

FED SHARE$ 368

GA. SHARE$

0TH SHARE$

92

FULTON 770610

TRAFFIC DETECTION ENHANCEMENT MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

ATLANTA UP .f R 175 CONG DIST ..!>
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $
CONST. 1995 $ FED SHARE$
GA. SHARE$ 0TH SHARE$

0
0 2000 1600
400

FULTON 770630

EMISSION INSPECTION & MECHANIC TRAINING TRAINING PROGRAM MISCELLANEOUS IMPROVEMENTS/ OTHER PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: LUKE COUSINS

ATLANTA TIP f R 158 CONG DIST.' 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL ~EDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1995 $ 750

FED SHARE$ 600

GA. SHARE$

0TH SHARE$ 150

FULTON 770631

REGIONAL RIDESHARE PROGRAM RIDE SHARING/ OTHER PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: LUKE COUSINS

ATLANTA TIP f R 159 CONG DIST. 5 & 4 .
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
- FED SHARE $
GA. SHARE$ 0TH SHARE $ -

0
0 3000
2400 600

.

.,

.:,

~

~

~

~ ,.

~

~~!IX~

~JL1ijl

~'~

~

., ~!2~ ~~'!~

t:~!i!i.~

l'@~\:.'.&1

k~!n~

.,~ ...... ~.
I ... ~

,,

.,,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 167

PROJECT LISTING BY (OUNTY FY 199~/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

FULTON MARTA EXPRESS BUS ROUTES - 3 ROUTES FOR 3 YEARS

ATLANTA TIP f M-R 160

PE

AFTER 96

770632 MISCELLANEOUS IMPROVEMENTS/ OTHER

CONG DIST. 5 & 4

ROW NONE

$

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1996 $ 5400

MANAGER: LUKE COUSINS

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE $ 4320

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

0TH SHARE $ 1080

FULTON 770633

MARTA DEMAND RESPONSIVE MINI-BUSES (2) FOR ONE YEAR MISCELLANEOUS IMPROVEMENTS/ OTHER
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: o
MANAGER: LUKE COUSINS

ATLANTA TIP f M-R 161 CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE

AFTER 96

ROW NONE

$

0

CONST 1996 $ 362

FED SHARE $ 290

GA. SHARE $

0TH SHARE $

72

FULTON 770634

PURCHASE 15 CLEAN ENGINE MARTA BUSES EQUIP. PURCHASE/ CAPITAL PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE COUSINS

ATLANTA TIP f M-R 162 CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0 0
3550 2840
710

FULTON 770636

MARTA BUS PRIORITY CONTROL SYSTEMS@ HIGH TRANSIT SIGNALS MISCELLANEOUS IMPROVEMENTS/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE COUSINS

ATLANTA TIP I M-R 164 CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 $

30

ROW NONE $

0

CONST 1996 $ 500

FED SHARE$

400

GA. SHARE$

0TH SHARE$

100

FULTON 770637

SIDEWALKS AT RAIL STATIONS, HIGH BUS AND PEDESTRIAN LOC
SIDEWALKS/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: LUKE COUSINS

ATLANTA TIP f R 165 CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE

AFTER 96

ROW NONE $

0

CONST 1996 $ 6000

. FED SHARE $ 4800

GA. SHARE $

0TH SHARE $ 1200

FULTON 770638

TRAFFIC OPERATIONS IMPROVEMENT PLANS FOR HIGH CONGESTED LOC
MISCELLANEOUS IMPROVEMENTS/ OTHER PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE COUSINS

ATLANTA TIP IR 176 CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
3000 2400
600

FULTON 770660

MARTA ADA PARATRANSIT/RAIL STATION MODIFICATIONS; PHASE 2
TRANSIT PROJECTS/ CAPITAL PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP IR 150 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $
ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
2180 1744
436

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

r,EORGIA DEPARTMENT OF TRANSPORTATION STl\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

FULTON 77U330

OLYMPICS TRANSPORTATION PLANNING - 1995 FUNDING PRELIMINARY ENGINEERING/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

ATLANTA -TIP .f R 149 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDER.AL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 168

FISCAL YEAR

COST ESTS

PE 1995

$

250

ROW NONE

$

0

CONST NONE

$

0

FULTON 77W330

OLYMPICS TRANSPORTATION PLANNING - 1996 FUNDING PRELIMINARY ENGINEERING/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP f R 149 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996

$

250

ROW NONE

$

0

CONST NONE $

0

FULTON 77Y330

OLYMPICS TRANSPORTATION PLANNING - 1994 FUNDING

PRELIMINARY ENGINEERING/ PLANNING

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

-.

ATLANTA TIP f R 149 CONG.DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

250

ROW. NONE $

0

CONST NONE

$

0

FULTON 77Y560

BRIDGE PAINTING PROJECT - DISTRICT 7; FOR IM$; SEE 770560 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP f R 131 CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

654

FED SHARE $

589

GA. SHARE$

65

0TH SHARE$

' ,.

., f

'.

~

== ~ ~ ~ ~ ~

~~.ml

&!rt~:~

~K~ ~):C!t1
"

t:~:~

i;~L~~

jrii~

I ..........,:~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

GILMER 6Bl353

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GILMER MANAGER: STEVE KISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

.. .

16-Sep~l993 Page 169

FISCAL YEAR

COST ESTS

OPERATING 1994 $

58

FED SHARE$

34

GA. SHARE$

0TH SHARE$

24

GILMER 6B1354

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GILMER MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

62

FUND SOURCE: RURAL TRANSIT

FED SHARE$

36

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

26

GILMER 6B1355

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GILMER MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1996 $

64

FUND SOURCE: RURAL TRANSIT

FED SHARE$

37

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

27

GILMER 6C2353

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GILMER MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1994

$

28

FUND SOURCE: RURAL TRANSIT

FED SHARE$

22

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

GILMER 61Y980

DECK OVERLAYS FOR 115-0006; 115-0007; 123-0024; 129-0066
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: UNKNOWN

PE NONE $

0

CONG DIST. 9 & 7

ROW NONE $

0

CONST 1994 $ 535

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 428

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 107

610980 IS AN ASSOCIATED PROJECT.

0TH SHARE$

GILMER 621270

SR 282 EB FM MP 1.7 TO 3.4; EB FM MP 8.2 TO 9.95
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.45 MANAGER: BILL MCVEY

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994 $

15

CONST 1995 $ 1511

FED SHARE$ 1209

GA. SHARE$ 302

0TH SHARE$

GILMER 631080

SR 52 LEFT TURN LANE@ SR 2 TURN LANES/ TRAFFIC PROJECT MILEAGE : .15 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: BILL MCVEY

PE NONE $

0

CONG DIST. 9

ROW NONE $

0

CONST 1994 $

87

FUND SOURCE: HWY. SAFETY

FED SHARE$

78

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

9

631090 IS AN ASSOCIATED PROJECT.

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 170

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

GILMER SR 2@ CARTECAY RIVER

PE 1992 UNDERWAY-

631090 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.

CONG DIST. 9

ROW 1993. UNDERWAY

PROJECT MILEAGE: .13

CONST 1994

$

423

MANAGER: BILL MCVEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

338

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

85

631080 IS AN ASSOCIATED PROJECT.

0TH SHARE $

GILMER 631100

SR 282/ELLIJAY FM CR 39/MADDOX DR TO SR 5/US 76 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.17 MANAGER: J. GRAYBEAL (C)

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$ 1620

CONST 1995 $ 2826

FED SHARE $ 2261 .

GA. SHARE $ '565

0TH SHARE $

GILMER 631110

SR 52 EB FM MP 16.0-17.8; WB MP 18.8-20.17 ADDITION OF A PASSING LANE. PROJECT MILEAGE: 3.17 MANAGER: BILL MCVEY-

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992
ROW 1996 CONST

UNDERWAY

$

35

AFTER 96

GILMER 631260

I.
SR 382 EXT FM CR 239/0LD SR 5 TO NEW APO CORRIDOR/SR 5CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE: .75 MANAGER: BILL MCVEY (M)

CONG DIST .. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

40

AFTER 96

GILMER 631430

SR 2/SR 52@ MOUNTAINTOWN CREEK 6.7 MI NW OF ELLIJAY REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .23 MANAGER:

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN. FUNDS

-PE 1994

$

17

ROW 1995 $

10

CONST 1996 $ 571

FED SHARE$

457

GA. SHARE$ 114

0TH SHARE$

GILMER SR 515 FM CR 300 (PICKENS) TO UNION CL .. PICKENS/FANNIN 67080X RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 9

PE NONE

$

0

ROW 1994

$

0

PROJECT MILEAGE : 48.26 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

670800 IS AN ASSOCIATED PROJECT.

0TH SHARE$

.. ' ..

~

P!!!!l!!!l!l . ~

~

~

"~ "'=

~

t~ z = m

~

~ ii1::'.'!l:'.O
"

B,{!~f\~~

h:::~:<-:cil

r~:~_._.. :.~~1

,~~~

,.............,

..l-

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 171

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. I-.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
GLASCOCK COUNTY OPERATED PUBLIC TRANSIT SERVICE

281113 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 11

FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH

C.

FUND SOURCE: RURAL TRANSIT

OPERATING 1994

$

32

FED SHARE$

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

GLASCOCK COUNTY OPERATED PUBLIC TRANSIT SERVICE 281114 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1995 $

34

FUND SOURCE: RURAL TRANSIT

FED SHARE$

19

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

15

GLASCOCK COUNTY OPERATED PUBLIC TRANSIT SERVICE 281115 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1996 $

35

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

20

GA. SHARE$

0TH SHARE$

15

GLASCOCK ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO 2C2113 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

'

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 172

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

----------------------------------------

---------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

GLYNN ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

5Vl013 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 1

FUNDS RECIPIENT: AGENCIES IN GLYNN MPO AREA MANAGER: STEVE KISH

CAPITAL 1994

$

16

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

.

0TH SHARE$

2

GLYNN 5V1014

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN GLYNN MPO AREA MANAGER: STEVE KISH

CONG DIST. 1

CAPITAL 1995

$

17

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

GLYNN ELDERLY AND DISABLED"VEHICLES AND EQUIPMENT

5Vl015 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 1

FUNDS RECIPIENT: AGENCIES IN GLYNN MPO AREA

r.

CAPITAL 1996

$

17

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED_ SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

GLYNN 51108X

I-95 FM CR 138/CAMDEN TO US 17 .. SEE CAMDEN CO

UNKNOWN/ UNKNOWN

PROJECT MILEAGE : - 00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

-

BRUNSWICK TIP f BATS93-11

PE 1994 $

0

CONG DIST. 1

ROW NONE $

0

CONST 1996 $

0

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

511084 IS AN ASSOCIATED PROJECT.

0TH SHARE$

GLYNN 511090

I-95 FM US 17/SR 520 S/BRUNSWICK TO US 341 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.68 MANAGER: M. REYNOLDS (M)

BRUNSWICK TIP f BATS93-09 CONG DIST_. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

GLYNN 511100

I-95 FM US 341 TO ALTAMAHA RIVER@ MCINTOSH CO LINE RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 8.66 MANAGER: M. REYNOLD$ (M)

BRUNSWICK TIP f BATS93-10 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ~MIN FUNDS

PE.1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

GLYNN 520890

SR 25/BRUNSWICK FM S OF TORRAS CAUSEWAY N TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 1.97 MANAGER: D. CHURCH (C)

BRUNSWICK TIP f BATS93-05 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW 1994

$ 1815

,CONST 1996

$ 4048

- FED SHARE $ 3238

GA. SHARE $

810

0TH SHARE $

... ".

~

-

~

~

~

~ ~

rn~~

~.!9.ffl

= =

t~:,:rn

~

lr'.!fL~!!

llJ/iil'.~

,r:: :.:.:j:d

~~

~-1.' ....

...

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 173

'PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

G-PL-Y-.IN-.NN--O-.--S-R--5-2-0-/-J-E-K-Y-L-L--P-ISR-LO-A-JNE-DC-T--RD-DA-@-TA--JE-K-Y--L-L--R-IV-E-R-----------------------------B-R-U-N-S-W-CI-OC-KM-M-TE-IN-PT-S-f--B-A-T-S-9-3---2-1---------------P-EY-EA-1-R9-8-5-----U-EN-DS-TER-SW--AY

521330 BRIDGES/ REPLACEMENT

CONG DIST. 1

ROW 1993 UNDERWAY

PROJECT MILEAGE : ,93

CONST 1994

$ 9057

MANAGER: N. PASSMORE

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 7246

FEDERAL HIGHWAY ADMIN FUNDS

GA, SHARE$ 1811

0TH SHARE$

GLYNN 521350

SR 520/US 17 FM I-95 TO JEKYLL ISLAND CAUSEWAY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES, PROJECT MILEAGE : 4.50 MANAGER: PETE BLOCKER

BRUNSWICK TIP f BATS93-03 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 521355 IS AN ASSOCIATED PROJECT,

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1994

$ 4325

FED SHARE$ 3460

GA. SHARE$ 865

0TH SHARE.$

GLYNN 521355

SR 520/US 17@ FANCY BLUFF CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : ,03 MANAGER: PETE BLOCKER

BRUNSWICK TIP f BATS93-04
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521350 IS AN ASSOCIATED PROJECT.

PE 1991 UNDERWAY

ROW NONE $

0

CONST 1994

$ 2100

FED SHARE$ 1680

GA. SHARE$

420

0TH SHARE$

GLYNN 522040

SR 25/BRUNSWICK-ROADWAY & APPROACH WORK TO SIDNEY LANIER BR

BRIDGES/ NEW CONSTRUCTION

PROJECT MILEAGE : 2.00

MANAGER: J. GRAYBEAL

r_

BRUNSWICK TIP f BATS93-0l CONG DIST. 1
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1995 $ 100

CONST 1996 $ 40000

FED SHARE$ 20000

GA, SHARE$

0TH SHARE$ 20000

GLYNN 522045

SR 25/BRUNSWICK MAIN SPAN OF HIGH LEVEL SIDNEY LANIER BRIDGE
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: UNKNOWN

BRUNSWICK TIP f BATS93-01 CONG DIST. 1
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA, SHARE$
0TH SHARE$

0 0 52000 26000
26000

GLYNN 522310

SR 27@ I-95 FM W/CRISPEN BLVD/CR 589 TOW/YELLOW BLUFF CRK RECONSTRUCTION & WIDENING FROM 5 LANES TO 6 LANES. PROJECT MILEAGE : .87 MANAGER: BILL MOSKAL

BRUNSWICK TIP f BATS93-02 CONG DIST. 1 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$ 2781

FED SHARE$ 2225

GA. SHARE$

556

0TH SHARE$

GLYNN 522730

SR 25 AT TALMADGE AVENUE IN BRUNSWICK INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANE'S: 0
MANAGER:

BRUNSWICK TIP. f BATS94-08 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1995

$

173

FED SHARE$

17.3

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 174

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

F.ISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

GLYNN BAY ST/FIRST AVE FM NEW CASTLE-w BY NW TO PRINCE ST

BRUNSWICK TIP I BATS93-28

PE 1993 UNDERWAY

550450 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIS.T . .1

ROW LOCL

PROJECT MILEAGE : 40

CONST

AFTER 96

MANAGER: BILL MOSKAL

FOND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY AI>MIN FUNDS

GLYNN CR 141/F.OURTH ST FM ALTAMA AVE/CR 590 NE TO SR 25

550520 RECONSTRUCTION, & WIDENING FROM 2 LANES TO 4 LANES.

r.

PROJECT MILEAGE : 1.15

MANAGER: D. CHURCH (M)

BRUNSWICK TIP I BATS93-19
CONG DIS,T. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADM.IN FUNDS

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

GLYNN 570840

HISTORIC WATERFRONT MISCELLANEOUS IMPROVEMENTS / ENHANCEMENT PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROP,OSED LANES: 0
MANAGER: KEITH GOLDEN ..

GLYNN 57096X

BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT IS/CHATHAM

BRIDGE'PAINTING / MAINTENANCE

.

PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNKNOWN

BRUNSWICK TIP I BATS94-14
CONG DI~T. 1 fUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN ~qNDS
CONG D_IST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL..HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONSTl995

$

813

FED SHARE$

650

GA. SHARE$

0TH SHARE$

163

PE NONE $

0

ROW NONE

$

0

CONST 1994 $

0

FED SHARE$

:GA. SHARE $

0TH SHARE$

r

... ,, ,_.

~ ~ ~ ~ ~ ~~ ~'.'.!~ ~~ r~ .;,= t!!.~~!i5't?.tli ~ Ii~~ lt::!'.:X~ r~,:6; ~-,.-:.

'-

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 175

COUNTY P, I.NO,

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL_ YEAR

COST ESTS

GORDON COUNTY OPERATED PUBLIC TRANSIT SERVICE

-----------------------------------------

681359 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 9

FUNDS RECIPIENT: GORDON MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

OPERATING 1994 $

56

FED SHARE$

32

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

23

GORDON 681359

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GORDON MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

56

FUND SOURCE: RURAL TRANSIT

FED SHARE$

32

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

24

GORDON 681360

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GORDON MANAGER: STEVE KISH

GORDON 6C2359

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GORDON
MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1996 $

59

FUND SOURCE: RURAL TRANSIT

FED SHARE$

34

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

25

I.

CONG DIST. 9

FUND SOURCE: RURAL TRANSIT

CAPITAL 1994

$

20

FED SHARE$

u

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

CORDON 6C2360

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GORDON MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1996

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

GORDON 610550

SR 53 OVER I-75 TURN LANES/ TRAFFIC PROJECT MILEAGE : .19 - EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: H GANNAWAY

GORDON 610750

I-75@ SR 156 IN CALHOUN INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE: ,30 - EXIST, LANES: 3 /PROPOSED LANES: 5
MANAGER: H GANNAWAY (HI

CONG DIST. 9 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY ROW 1994 $ 120 CONST 1995 $ 2291
FED SHARE $ 2062
GA. SHARE $ 229 0TH SHARE $

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1996 $ 3299

FED SHARE $ 2969

GA. SHARE $ 330

0TH SHARE $

r.r.nr,r.J/\ f1F.P/\RTMF:tlT OF" Tll/\llSNlRT/\TJON
ST/\TE TRNISPORTATlON IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 176

COUNTY P.1.NO.

DESCRIPTION PROJECT DATA

CORDON I-75 @ SR 225 N OF CALHOUN

FISCAL

COST

- ---------------C-O-H--H-E-N-T-S--------------------------P-Y!-E-A1-R9-9-2---.-.-U-N!S-DT-ER-SWAY

'10755 INTERCHANGE / RECST. OR REHAB.

CONG.DIST, 9

ROW 1995

$

20

PROJECT MILEAGE : ,50 - EXIST. LANES: 6 /PROPOSED LANES: 6

-CONST 1996 $ ,1793

MANAGER: AAY METTS.

FUND SOURCE: I-STATE HAINT.

. FED SHARE $ 1605

FEDERAL HIGHWAY ADMIN FUNDS

GA. SR.AR$ 179

0TH SHARE$

CORDON 610920

I-75 UPGRADE REST AP.EA 134 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE I ,00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER!

CONG DIST. 9 ..
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS

P! 1994

$

29

RO'lf NONE $

0

CONST 1995

$

953

FED SR.AR$ 959

GA. SHARE$

95

0TH SHARE$

CORDON 610930

I-75 INTERCHANGE AT SR 136 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : ,00 - EXIST. LANES: 6 /PROPOSED LANES: 6 MANAGER: N PASSMORE (HI

CONG DIST, 9-
FUND SOURCE: I-STATE HAINT, FEDERAL HIGHNAY ADHIN FUNDS

PE 1996 ROW CONST

$

16

AFTER 96

AFTER 96

CORDON 620790

SR 3/US 41 FH S OF SR 156 N TO CALHOUN BYP IN CALHOUN RECONSTRUCTION I WIDENING FROM 2 LANES TO 4 LANES. P,ROJECT HI LEAGE I 1. 43
MANAGER! MGANNAWAY (HI

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHNAY ADHIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 4594 AFTER 96

GORDON 621365

SR 3/US 41/CALHOUN FH S OF AIRPORT TO SR 53/INCL BR Clf'T EXT ltECONSTRUCTION I NIDENINO FROH,2 LANES TO 4 LANES. PROJECT MILEAGE: 1.60 MANAGER! M GANNAWAY (HI

GORDON 621510

SR 53@ CSX RR/FAIRMOUNT
REPLACEMENT or THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
PROJECT MILEAGE : , . 20
MANAGER: BILL MCVEY

GORDON 621540

SR 53 "8 HP 14.67-15.8;EB HP 15.84-16,69;EB HP 18,1-19.37
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.25 MANAGER: BILL MCVEY (HI

CONG DIST, 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL1 H1GHWAY ADHIN FUNDS
CONG DIST, 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 621545 IS AN ASSOCIATED PROJECT._

PE 19~2 _UNDERWAY..

RO" NONE $

0

CONST 1995 $ 36!>3

FED SHARE $ 2954

GA. SHARE $ 739

0TH SHARE $

P! 1993 UNDERWAY

RO"l994

$

186

CONST 1995 $ 1120

. FED' SHARE $ 896

GA. SHARE $ 224

0TH SHARE $

PE 1992 ROW 1995 CONST

UNDERWAY

$

95

AFTER 96

.. ,, .

~~

~

~ ~

- , t='ll!
~

ei~!~i:,

t=&t~
~

li;:?~~t~

~
!;;fil:l=

i!1!::~

~:::~:H1J,. e~~

1::i:.:rt~

~~

ri.: : ,.J

t,:,:::.:-~..~~

,,:...-........ -.

I 'I

GEORGIA OEPARTHENT or TRANSPORTATION
STATE TRANSPORTATION IHPROVEHENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 177

COUNTY

OESCRIPTION

FISCAL

COST

P,l,NO,

PROJECT OATA

COMMENTS

YEAR

ESTS

G-O-R-!-)O-N----S-R---5-3-@---P-IN-E---LO-G---C-R-E-EK------------------------------------------------------------------------------------P-E--1-9-9-2-----U-N-O-ER-W--AY

621545 REHABILITATION or THE EXISTING BRIOGE(SI, NO ADOEO LANES.

CONG OIST, 9

ROW NONE $

o

PROJECT MILEAGE : ,26

.

CONST

AFTER 96

MANAGER: BILL MCVEY (H)

FUNO SOURCE: BRIOGE PROGRAM

FEOERAL HIGHWAY ADHIN FUNOS

621540 IS AN ASSOCIATED PROJECT.

GOROON 621620

SR 53/CALHOUN FH WC BRYANT PKWY/CS 814 EAST TO SR 3/US 41

TURN(LANES / TRAFFIC

.

PROJECT MILEAGE : .68 - EXIST. LANES: 4 /PROPOSEO LANES: 5

MANAGER1 RAY METTS (HI

CONG DIST, 9
FUND SOURCE: HWY. SAFETY FEOERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

CORDON 621630

SR 225 AT 4 LOCATIONS IN GOR!)ON, HURRAY COUNTIES
ADDITION or A PASSING LANE.
PROJECT MILEAGE: 5.96
MANAGER: BILL MCVEY (HI

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

CORDON 631225

CR 373/DEWS POND RD FH CR 481/CASR RO TO SR 53 MINOR WIOEN, RESURP' / RECST. OR REHAB. PROJECT MILEAGE I 3.04 - EXIST, LANES: 2 /PROPOSED LANES: 2
MANAGER: BILL MCVEY

GOR!)ON 631290

SR 136 EB HP 10-11.3; WB HP 12.3-13.6 EAST OF RESACA
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.60 MANAGER: BILL MCVEY (HI

CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNOS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY. ROW LOCL CONST 1996 $ 1727
FED SRARE $ 1382 GA. SHARE$ 345 0TH SHARE $'

PE 1996 ROW CONST

$

50

AFTER 96.

AFTER gg.

GORDON 631370

SR 136 CONN, EB HP 4.5 TO HP 5.8; WB HP 6.55 TO HP 7.55
ADDITION OF A PASSING LANE, PROJECT MILEAGE : 2.30 MANAGER:

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADHIN FUNDS

PE 1995 ROW CONST

$

33

AFTER 96

AFTER 96

GORDON 650420

HILLHOUSE ST EXT/CALHOUN@ CSX RR-OR-HICKS ST EXT@ CSX RR
BRIOGES / RECST. OR REHAB. PROJECT MILEAGE : .75 MANAGER: H GANNAWAY (HI

CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS

PE 1996 ROW NONE CONST

$

16

$

0

AFTER 96

r.F:OPGJ/\ OF:P/\RTHF:tlT or TRJ\N~PORT/\TJQN
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJl':CT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 178

COUNTY

DESCRIPTION

FISCAL

COST

C-1O~7R0:D7~O3N0:~~CR:RE-P-L4-A7-C3-E/-FM-AE-IN-RT-V-Io-E-rW-PR-T-HOR-EDJE-@C-E-TX-LI-SOIC-TA-RITN-A-GC-R-BE-ER-~-IO--G-E-S-(-S-)-. -N-O--A-O-O-E-O---L-A-N-E-S-.-----------C-O-N-G--D-CI-OS-MT-M.--E9N-T-S--------------------------RO-PW-EY-E-AL1-RO9-C9-L3-----U-NE-DS-ETR-SW--AY

PROJECT MILEAGE : .16

CONST 1995 $

n

MANAGER! BILL MCVEY

FUND SOURCE: BRIOGE PROGRAM FEOERAL HIGHWAY AOMIN FUNDS

FED SHARE$ GA. SHARE$

7u 8

0TH SHARE$

l'.
l!I ,,
I I

..



4

~

~

~

~ ..

~

!131~

lf~ilj~

m~.i:[;!ij_

-~

Pl.~['~'~

~

tt:tie$:i

~

iri'.-:;--::::

..

GF.ORGIA DEPARTMENT or TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 179

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO,

PROJECT DATA

G-R-A-D-Y-----S-R---11-2--S-B--H-P---2-. 3---TO---3-. -3-: --N-B--H-P--1-0-,-3--T-O--1-1-.-3---------------------------

COMMENTS
- -------------

-

YEAR .

l!:STS

----------------------------

PE 1992 UNDER"AY

421940 ADDITION or A PASSING LANE.

CONG DIST. 2

ROW 1993 ONDER"AY

PROJECT MILEAGE: 2.00

CONST 1994 $ 697

MANAGER: J. LINDSEY

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 558

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 139

OTB SHARE $

GRADY 422180

SR 111@ sorKEE CM N/CR 81 UPLACEHENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE: .17 MANAGER: J. LINDSEY

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 lJNDER"AY

ROW 1994 $

1

CONST 1995 $ 531

FED SHARE $ 425

GA. SHARE $ 106

OTB SHARE $

GRADY 431330

SR 111 OVER TURKEY CREEK REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES. PROJECT MILEAGE: .00
MANAGER:

CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

Pl!! 1994

$

10

ROW 1994 $

1

CONST 1996 $ 391

FED SHARE$ 313

GA, SHARE$

78

0TH SHARE$

GRADY 442550

SR 189 OVER NEST BRANCH BARNETTS CREEK REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 ROW 1996 CONST

$

10

$

1

AFTER 96

CRADY 442552

SR 189 OVER BARNETTS CREEK/THOMAS REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 ROW 1996
CONST

$

10

$

1

AFTER gg

C.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

r.F:OIH-:IT\ l'f.r/\PTMF:NT Of" TRJ\tlSrORTJ\TION STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY.1996
COMMENTS

GREENE 2B1119

COUNTY OPERATED PUBLIC TRANSIT .SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GREENE HANAGERI STEVE KISH

CONG DIST, 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

GREENE 281119

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GREENE MANAGER: STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AD~IN FUNDS

GREENE 281120

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GREENE MANAGER! STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN.FUNDS

GREENE 2C211B

TWO STANDARD VANS AND 1190 MOBILE RADIOS TRANSIT FACILITil'!S / CAPITAL FUNDS RECIPIENT: GREENE
MANAGER! STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL-TRANSIT ADMIN FUNDS

GREENE 2C2119

ONE CONV. VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GREENE MANAGER! STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

16-Sep-1993 Page 180

FISCAL YEAR

COST ESTS
.

OPERATING 1994 $

79

FED SHARE$

45

GA. SHARE$

0TH SHARE$

]]

OPERATING 1995 $ Bl

FED SHARE$

47

GA. SHARE$

OTR SHARE$

]4

OPERATING 1996 $

96

FED SHARE$

50

GA. SHARE$

0TH SHARE$

36

CAPITAL 1994

$

42

FED SHARE$

34

GA; SHARE$

4

OTR SHARE$

4

CAPITAL 1995

$ 54

FED SHARE$

43

GA . SHARE $

6

OTR SHARE$

5

GREENE 210690

1-20 AT SR 44 INTERCHANGE LIGHTING./ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. I 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

5

ROW NONE $

0

CONST 1994 $ 210

FED SRA.RE$ 169

GA. SHARE$.

42

0TH SHARE$

GREENE 221360

SR 12/GREENSBORO FM WALNUT ST TOE OF EAST GREY.NE ST RECONSTRUCTION, WIDENING FROM 2 LANES TO 3 LANES. PROJECT MILEAGE : .39 HANA.GER: D. GRIFFITH

CONG DIST. 11 .
FUND SOURCE: HWY. SAFE~Y FEDERAL HIGHWAY ADMIN FUNDS 221610 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1994

$

40

CONST 1995 $ 500

FED SHARE$ 450

GA. SHARE$

50

0TH SHARE$

!.c,

.. rt 11.

~ ==

=~= ~ ~ ~ ~~ e1f1~ ~

~;.(:)~~ e'.!".~ !65,~~ ~~ rr."'--:"i;/

~

..
'

GEORGIA OEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 181

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY P. I .NO,

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL YEAR

COST ESTS

G--R-EE-N-E----S-R---12-/-G-R-E-E-N-S-B-O-R-O---FM-- E.-O-F--E-A-S-T--G-R-E-E-N-E--S-T--T-O--E-B--P-A-S-S-I-N-G---LA-N-E------------------------------------------------P-E--1-9-9-2-----O-N-D-ER-W--AY

221610 TURN LANES/ TRAFFIC

CONG DIST, 11

ROW 1994 $

87

PROJECT MILEAGE : 1.10 - EXIST, LANES: 2 /PROPOSED LANES: 3

CONST 1995 $ 937

MANAGER! D, GRIFFITH

FUND SOURCE: RWY, SAFETY

FED SHARE $ 843

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE $

94

221360 IS AN ASSOCIATED PROJECT.

0TH SHARE $

GREENE 2218U

SR 44 FM SR 16/PUTNAM TO HP 2.89/GREENE ... SEE PUTNAM CO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 221840 IS AN ASSOCIATED PROJECT,

PE 1992 ROW CONST

UNDERWAY, AFTER 96
AFTER 96

GREENE 270680

CR 38 8 RICHLAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .10 MANAGER: D, GRIFFITH

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1991 ONDERWAY

ROW LOCL

CONST 1996 $ 156

FED SHARE$ 125

GA. SHARE$

31

0TH SHARE$

GREENE 270681

CR 66/LESLIE MILL RD@ BEAVERDAM CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : ,25MANAGER: D. GRIFFITH
I.

GREENE 270870

CULVERT EXT@ VAR LOC ON STATE ROUTES.,OGLET/TALIF
BRIDGES/ MAINTENANCE PROJECT MILEAGE: ,00 MANAGER: L. SEABROO~

CONG DIST. 11 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST, 2 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 27087X IS AN ASSOCIATED PROJECT.

Pl!! 1992 UNDERWAY

ROW LOCL

CONST 1996 $ 196

FED SHARE$ 157

GA. SHARE$

39

0TH SHARE$

PE NONE $

0

ROW NONE $

O

CONST 1994 $ 211

FED SHARE$ 169

GA. SHARE $

42

0TH SHARE$

Gr.ORr.IA or.rARTMENT Or TRJ\NSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 182

COUNTY

DESCRIPTION

P.t.NO,

PROJECT DATA

COMMENTS

<-:-W-I-N-N-ET-T--C--A-P-IT-A-L--F-O-R--G--W-I-N-N-E-T-T--C-O-U-N-T-Y--V-A-N-P-O-O-L--P-R-O-J-E-C-T----------------------------------------------------------

FISCAL YEAR

COST ESTS

1D7034 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 4 , 10

FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT

CAPITAL 1994

$

96

FED SHARE $

77

FEDERAL TRANSIT ADHIN FUNDS

GA, SHARE$

9

0TH SHARE$

10

<:WINNETT VANPOOL SERVICE FOR GWINNETT COUNTY 1D7035 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER! STEVE KISH

CONG DIST, 4 , 10
F_UNO SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADHIN FUNDS

OPERATING 1994

$

100

FED SHARE$

50

GA. SHARE$

0TH SHARE$

50

GWINNETT CAPITAL FOR GWINNETT COUNTY VANPOOL PROJECT 107036 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH

CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADHIN FUNDS

CAPITAL 1.995

$ 192

FED SHARE$ 154

GA. SHARE$

19

0TH SHARE$

19

<:WINNETT CAPITAL FOR VANPOOL PROJECT 1D7037 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER! STEVE .KISH -

CONG DIST, 4 , 10
FUND SOURCE:.URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ 100

FED SHARE$

50

GA. SHARE$

0TH SHARE$

50

GWINNETT CAPITAL FOR COORDINATED E ' R SERVICES FOR GWINNETT COUNTY 1D7038 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH

CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADHIN FUNDS

CAPITAL 1995

$ 703

FED SHARE$ 562

GA. SHME $

71

0TH SHARE$

70

GWINNETT COORDINATED E, H SERVICES FOR GWINNETT COUNTY

107039 TRANSIT PROJECTS/ OPERATIONS

t

FUNDS RECIPIENT: GWINNETT COUNTY

MANAGER: STEVE KISH

CONG DIST. 4 , 10
FUND.SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADHIN FUNDS

OPERATING 1995 $ 348 FED SHME $ 174 GA. SHARE$ 0TH SHARE$ 174

GWINNETT CAPITAL FOR GWINNETT COUNTY VANPOOL PROJECT
1D7040 TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: GWINNETT COUNTY MANAGER! STEVE KISH

CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADHIN FUNDS

CAPITAL 1996

$ 288

FED SHARE$ 230

GA. SHARE.$

29

0TH SHARE.$

29

.

<a

~

~

~

~,,

~

~

~j!

X~~~~

&ji,;:(t,~

~

,~-;_;i~~

~li:13

~

Ii-:,~~;-~

r:.:>;;

!. ~ ..:

.. ::'-

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GWINNETT VANPOOL SERVICE FOR GWINNETT
1D70tl TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH

GEORGIA DEPARTMENT or TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 183

COMMENTS

FISCAL .

COST

YEAR

!STS

--------------------------------------

CONG DIST. 4 , 10

FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996

$

100

FED SHARE$

!50

GA. SHARE$

0TH SHARE$

!50

GWINNETT CAPITAL FOR COORDINATED E, R SERVICES FOR GWINNETT COUNTY 1D70t2 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISR

CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$ 607

FED SHARE$

486

GA. SRARE $

60

OTR SHARE$

61

GWINNETT COORDINATED E, R SERVICES FOR GWINNETT COUNTY 1D70t3 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH

CONG DIST. 4 , 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996 $ 3f8 FED SHARE$ lH GA. SHARE$
0TH SHARE$ lH

GWINNETT CAPITAL FOR COORDINATED E, R SERVICES FOR GWINNETT COUNTY 1D7lt6 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH

CONG DIST. 4 C 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1994.

$ 138

FED SHARI!!$ 110

GA. SRARE $

14

OTR SHARE$

14

GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1V1028 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY
MANAGER: STEVE KISH

CONG DIST. 4 , 10

CAPITAL 1994

$

n

FUND SOURCE: ELDERLY, DISABLED FUND FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$ GA. SHARE $ 0TH SHARE$

33 4

GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1V1029 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH
GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1V1030 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH

CONG DIST. 4 g 10

CAPITAL 1995

$

t2

FUND SOURCE: ELDERLY g DISABLED FUND FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$ GA. SHARE$ 0TH SHARE$

34

CONG DIST. 4 g 10

CAPITAL 1996

$

44

FUND soURCE: ELDERLY' DISABLED FUND FED SHARE$

35

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$ 0TH SHARE$

5

I.

r.i::npr. J T\ l>F:PTIRTMENT OF TPJ\NSPOl"ITTITIOtl STTITF. TR/\NSPORTTITIO: IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 184

COUNTY

DESCIUPTION

FISCAL

COST

P.I.NO,

PROJECT DATA

COMMENTS

YEAR

. ESTS

CW--IN-N--ET-T---I--8-5--F-H---S-, --SR---3-1-6--T-O--O-L-D--P.E-A-C-H-T-R-E-E--R-D--I-N-C-L--C-D--S-Y--S-T-E-M--:,-1-1Y--2-3-0------A-T-LA-N--TA---T-IP---I--G-W--R---7-2-------------------p-g--1-9-8-8-----U-N-O-ER-W--AY

110230 INTERCHANGE/ RECST, OR REHAB,

CONG DIST. 6

ROW 1989 UNDERWAY

PROJECT MILEAGE: 2,82 - EXIST, LANES: 2 /PROPOSED LANES: 4

CONST

AFTER 96

MANAGER: J. GRAYBEAL(CH)

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

CWINNETT I-985@ SR 20 (SR 20 TO 3 LANES)
110330 INTERCHANGE/ RECST, OR REHAB. PROJECT MILEAGE : .39 - EXIST, LANES: 2 /PROPOSED LANES: 4
MANAGER: R. ASHHORE(M)

ATLANTA TIP I GW-R 69
CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

CWINNETT I-85 8 SR 20/LAKRENCEVILLE HIGHWAY
110360 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.52 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER! H. ASHMORE

ATLANTA TIP IR 68
CONG DIST. 10, 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

CWINNETT I-85 rH I-285 TO I-985 .. ,SEE DEKALB

110410 LANDSCAPING/ ENHANCEMENT

PROJECT MILEAGE : 17.62 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: E. LAWS

.

ATLANTA TIP I GW-R 136
CONG DIST. 4 , 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

PE 1993 UNOERWAY
ROW 1994 $ 1548 CONST 1995 $ 9177
FED SHARE $ 8259
GA. SHARE $ 918
0TH SHA.RE $

. PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

CWINNETT I-85 SIGN HOD rH DEK CL TO SC STATE LN,,JACK/BANKS/BAR/FRANK
110440 SIGNINO / MAINTENANCE PROJECT MILEAGE: 76,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
HANAGERI L, SEABROOK

GWINNETT I-85 FM SR 316 TO OLD PEACHTREE INCL CD-IH FUNDS: SEE 110230

11Y230

INTERCHANGE/ RECST, OR REHAB. PROJECT MILEAGE : ,00 - EXIST, LANES: 2 /PROPOSED LANES: 4

MANAGER: UNKNOWN

CONG DIST. 10, 6
FUND SOURCE: I-STATE MAINT, FEDERAL HIGHWAY ADHIN FUNDS 11044W IS AN ASSOCIATED PROJECT,
ATLANTA TIP I GW-R 72
CONG DIST. 6.
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 144

FED SHARE$ lU

GA. SHARE$

0TH SHARE$

PE NONE ROW 1989 CONST .

$

0

UNDERWAY

AFTER 96

GWINNETT SR 20 ON EXT LOC FM I-85 FOR 0.5 MI:NEN LOC TO EXIST 4-LN 120680 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.10 MANAGER: H. ASHMORE(H)

ATLANTA TIP I GW 14
CONG_ DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993. ROW CONST

UNDERWAY AFTER 96 AFTER 96

..

.,

..

~

~

~

~

~ ~

~

=e=;;,

~!t!t#l

~

~~

-=;g

~ ~

~ .,.
I''"""'""'

1::,:. ,;_;;

:-:.:.""::-" .....

---..

..

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 185

COUNTY P.I.NO,

DESCRIPTION PROJECT DATA

GWINNETT SR 10/STONE MTN FWY FM ROCP::BRIOGE RO TO E/HEWATT RO

FISCAL .

COST

COMMENTS

YEAR

ESTS

ATLANTA TIP f G'-lf--12-4---------------------PE---1-9-9-3-----U-N-DE-R-W--AY

121490 RECONSTRUCTION, WIDENING FROM 6 LANES TO 8 LANES.

CONG DIST. 4

ROW 1994 $ 6500

PROJECT MILEAGE : 3.20

CONST 1996 $ 12553

MANAGER: BILL MOS!tAL

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$ 10042

FEDERAL RIGRWAY ADMIN FUNDS

GA. SHARE$ 2511

0TH SRAP.P! $

r
GWINNETT P'TREE IND BLVD FM RODGERS BRIDGE RD TO SR 20/SUGM HILL 121673 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PRO.iECT MILEAGE : 7.90 MANAGER: H. ASHMORE

ATLANTA TIP f GW 72 CONG DIST, 6 & 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

GWINNETT P'TREE IND BLVE FM SR 20/SUGM RILL NE TO RELOC SR 347/HALL 121676 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.50 MANAGER: H. ASHMORE
GWINNETT SR 120 FM MCP::ENDREE CHURCH RD TO SR 316 121680 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : ,99 MANAGER: RAY METTS
GWINNETT SR 120 FM I-85 TO Mcl'::ENDREE CHRUCH RD (EXCEPTION CT 11 121682 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECTHILEAGE: 3.03 MANAGER: RAY HETTS (M)

ATLANTA TIP f GW 100 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f GW 88 CONG DIST. 4 & 6 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f GW 88 CONG DIST. 4 & 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1995 $ 7500 FED SHARE$ 6000 GA. SltARE $ 1500 OTR SltARE $

PE 1992 UNDERWAY
ROW 1993 UNDERWAY CONST 1994 $ 2349
FED SHARE$ 1879 GA, SHARE$ 470 0TH SRAP.P! $,

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

GWINNETT SR 20/LOGANVILLE HWY FM OZORA RD NORTH TO PLANTATION BLVD 121710 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.90 MANAGER: H. ASHMORE(M)

ATLANTA TIP f GW 74 CONG DIST, 10, 4
FUND SOURCE:'suRFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

GWINNETT SR 124 FM CENTERVILLE-ROSEBUD RD TO HENRY CLOWER BLVD 121720 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.90 MANAGER: AAY METTS (C/M)

ATLANTA TIP t G'lf 76
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 5166 AFTER 96

GEOR~lh OEPhRTHENT OF TRAN~PORTATJON STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 186

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO,

PROJECT DATA

COMMENTS

YEAR

.. ESTS

G--W-IN-N--ET-T--S-R---31-6--A-T--S-U-G-A--R-LO--A-F--PA--R-IC-W-A--Y-/A-T-R-J-N-SO--N--R-O-A-D--(-M-L--2-.-4-5-)---------------A-T-L-A-N-T-A--T-I-P--I--G-W---R--1-0-1------------------P-E--1-9-9-3-----O-N-D-ER-W--AT

122490 INTERCHANGE/ RECST, OR REHAB.

CONG DIST. 4

ROW 1994 $ 2006

PROJECT MILEAGE : ,25 - EXIST, LANES: 2 /PROPOSED LANES: 4

CONST 1996 $ 3228

MANAGER! J, GRAYBEAL

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$ 2582

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 646

OTR SHARE$

GWINNETT SR 10/STONE MTN FWY FM EAST or HEWATT RD TO EAST OF SR 124
122520 RECONSTRUCTION, WIDENING FROM 6 LANES TO 8 LANES. PROJECT MILEAGE : 3.25
MANAGER! BILL HOSAAL

ATLANTA TIP I GW 57
CONG DIST, 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

UNDERWAY $ 9035 AFTER H

GWINNETT SR 316@ SR 20 122530 TURN LANES/ TR.Al'FIC
PROJECT MILEAGE: ,36 - EXIST. LANES! 0 /PROPOSED LANES: 0
MANAGERI

GWINNETT PARTIAL R/W FOR 121490

I.

12Y490 UNKNOWN/ RECST. OR REHAB.

PROJECT MILEAGE : ,00 - EXIST, LANES1 0 /PROPOSED LANES: 0

MANAGER! .

ATLANTA TIP I GW 132
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDER.AL HIGHWAY ADMIN FUNDS
ATLANTA TIP I G1f 124
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1996 $ 223

FED SHARE$ 223

GA. SHARE$

0TH SHARE$

PE NONE ROW 1995 CONST NONE

$

0

$. 13500

$

0

GWINNETT SR 20 8 DAVIS/SIMONTON ROADS 132300 TURN LANES/ TRAFFIC .
PROJECT MILEAGE: .16 - EXIST. LANES1 5 /PROPOSED LANES: 5 MANAGER: L. OWENS
GWINNETT SR 20@ SR 324 132310 TURN LANES/ TRAFFIC
PROJECT MILEAGE : ,26 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: L. OWENS
GWINNETT SR 13/BUFORD HIGHWAY@ GEORGE PIERCE PAAR 132 320 TURN LANES/ TRAFFIC
PROJECT MILEAGE : ,15 - EXIST, LANES: 2 /PROPOSED LANES: 3 MANAGER: L. OWENS

ATLANTA TIP I G1f 127
CONG DIST. 4 FUND-SOURCE: HNY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I GW 128
CONG DIST. 10 . FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I G1f 129 CONG DIST, 6 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1994 $

85

FED SHAH$

77

GA. SHARE$

9

0TH SHARE$

PE NONE $

0

ROW LOCL

CONST 1994 $ 150

FED SHARE$ 135

GA. SHARE$

15

0TH SHARE$

PE NONE $

0

ROW LOCL

CONST 1994 $ 187

FED SHA.RE$ 168

GA. SHARE$

19

0TH SHARE$

,. ..

- ..

~

~

== ~ ~ ~Ji!~

~ffiti1fi

~
='i-?J

-=

ier~:et1 ~~

~i,~~

~.ai-M

~,~:~;;::i

,:;-;-.;".~~~:

.

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY.1996

16-Sep-1993 Page 187

COUNTY P.I.NO.

DF.:SCRIPTION PROJECT DATA,

COMMENTS

FISCAL YEAR

COST ESTS

GWINNETT SR 13/BUFORD HWY FM OLD PEACHTREE RD TO SUGARLOAF PRWY------------A-T-LA-N--TA---T-I-P--f--GW---9-9---------------------P-E--1-9-9-6-----$------20

132360 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 6

ROW LOCL

PROJECT MILEAGE : 1,30 MANAGER: N, PASSMORE (M)

FUND SOURCE: SURFACE TRANSPORT.

CONST

AFTER 96

FEDERAL HIGHWAY J\DHIN FUNDS

/

GWINNETT SR 124 AT HOG MTN RD/ CR 203 141800 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE: ,00 - F.:XIST. LANES: 0 /PROPOSF.:D LANES: 0 MANAGER:
GWINNETT B. GWINNETT-GRAVES CONN FM OLD NORCROSS TO CRF.:SCENT DR
150190 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.70 MANAGER: J. GRAYBEAL(HJ

ATLANTA TIP f GW 131 CONG DIST. 10
FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ACHIN FUNDS
ATLANTA TIP I GW81/GW39
CONG DIST, 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ACHIN FUNDS

PE 1994 UNDERWAY

ROK 1994 $

10

CONST 1995 $ 262

FED SHARE $ 236

GA, SHARE $

26

OTR SHARE $

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

GWINNETT INDIAN TRAIL/LILBURN RD/CR 650 FM I-85 TO SRB/US 29 150250 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE: 3,24 MANAGER! D. SMITH (CJ

ATLANTA TIP I GW 109
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ACHIN FUNDS

PE 1993 ROW LOCL CONST

UNDERWAY
AFTER 96

GWINNETT RILLIAN RILL RD FM US 29 TO FIVE FORRS TRICRUM 150260 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : . 00 MANAGER: D, SMITH

ATLANTA TIP I GW 7
C_ONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ACHIN FUNDS

PE 1995 ROW LOCL CONST

$

20

AFTER 96

GWINNETT KILLIAN HILL RD FM FIVE FORKS TRICKUM TO US 78 150270 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .00 MANAGER: D. SMITH

ATLANTA TIP I GW 7
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ACHIN FUNDS

Pl!! 1995 ROW LOCL CONST

$

20

AFTER 96

GWINNETT FIVE FORKS TRICKUM FM KILLII\H HILL RD TO OAK RD 150280 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.47 MANAGER: D, SMITH
1.

ATLANTA TIP f GW 4 CO~G DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL H_IGHWAY ACHIN FUNDS

PE 1995 ROW LOCL CONST

$

.20

AFTER 96

r.r.n11,~rf\ flF:rflllTMF:tlT OF TP/\NSPORT!\T!Otl ST!\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 188

C-1P1C-7UO-0,INU-9.N-5NNT-0OYT-T-, -M-TPSR-RIAGO-AN-JNFAE-FGAC-IECT-LR-StM-S/IB-IGLUT-NE-RRAA-TAGL-FEDP-RFR-SIEIDCY-OS:D-SJCET-LR,EC0-EIMT-P0. -T-IDO-O-APN-TET-AIXM-I-SIZ-TA-,-T-ILO-AN-N-E-IS-N:--0G-1-'/IP-NR-NO-E-PTO-T-S-EC-DO-U-NL-TA-YN-E-S-:--0--------CFA-UOT-NNL-DAG-N-TDS-AOCI-OUS-MTTR-MCI.-PEE-4N:-TI-,CS-OG-WN6-G-1-M3-5-IT-.-/-A-I-R--Q-U-A-L------C-O-RN-OFPS-WEITFYS-EE.C-DAN11-ARO99-L9SN9-4HE5-A-R-.-E-$$$$-ZC-OS-TS-TS-435-0218050

FEDERAL HIGH1'AY AOMIN FUNDS

GA. SHARE$

54

0TH SHARE$ 156

G1'1NNETT HOV LN SIGNING ON 1-75, 1-85 HETRO AREA/CLAYTON;COBB1FULTON l1297X HOV LANES/ TRAFFIC
PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0

ATLANTA TIP IR 73
CONG DIST. 6

PE 1994 $

0

R01' NONE $

0

CONST 1995 $

0

MANAGER: BURT RIDDLE

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$

712970 IS AN ASSOCIATED PROJECT.

0TH SHAAI!! $

G1ftNNETT SR 120 FP.M PAR~ BR P~1'Y TO PEACHTREE IND BLVD/SEE FULTON

72100X PRELIMINARY ENGINEERING/ NEW CONSTRUCTION

1

PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0

MANAGER: NEIL DAVIS

ATLANTA TIP I RTP-FN 3 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 721000 IS ..AN ASSOCIATED PROJECT.

PE NONE ROW 1991 CONST

$

0

UNDERWAY

AF_TER _96

CWINNETT 72105X

SR 124 REHAB.

9
or

YELLOW RIVER/SEE DEICALB THE EXISTING BRIDGE(S).

COUNTY FROH

2

LANES

TO

4

LANES.

PROJECT MILEAGE: .03

MANAGERt RAY METTS

ATLANTA TIP I DK 99
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721055 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1995 CONST

UNDERWAY

$

0

.AFTER 96

GWINNETT SR 124 FH ROC~BRIDGE RD/DEICALB TO CENTERVILLE; SEE DEAALB 72153X RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES,
PROJECT MILEAGE: ,00 MANAGER: UNKNOWN

ATLANTA TIP I GW 76
CONG DIST, 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

0

AFTER 96



.. ""'

rt~

e:2;i~9

-~ == ==.i

~ ~

!)!~

~Y$

~~

t;'l::t~ ~
'

tf!<'.~.f!~

~~

!';.~:';':;:;,:.

t\-,':~

..

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 189

COUNTY

DESCRIPTION

FISCAL

COST

P, I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

RA--BE-R-S-H-A--C-O-U-N-T-Y---O-P-ER--A-T-E-D--P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------

1B1018 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE RISH

OPERATING 1994 $

47

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

OTB SHARE$

21

RABERSHA COUNTY OPERATED PUBLIC TRANSIT SERVICE 181019. TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE RISH

CONG DIST. 9

OPERATING 1995 $

49

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

23

RABERSHA COUNTY OPERATED PUBLIC TRANSIT SERVICE 181020 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE RISH

CONG DIST. 9

OPERATING 1996 $

52

FUND SOURCE: RURAL TRANSIT

FED SHARE$

28

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

24

RABERSHA ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RAD'ro

r

1C2018 TRANSIT FACILITIES/ CAPITAL

.

FUNDS RECIPIENT: HABERSHAM

MANAGER: STEVE RISH

CONG DIST. 9

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

HABERSRA ONE STANDARD VAN AND ONE MOBILE RADIO 1C2019 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE RISH

CONG DIST. 9

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADHIN FUNDS

GA. SHAAE $

2

OTB SHARE$

2

HABERSHA SR 17/115 FM NASHINGTON ST/SR 197 TO RIDGE ST/CS.550
122120 TURN LANES/ TRAFFIC PROJECT MILEAGE: .43 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS

CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994 $ 345

FED SHARE $ 311

GA. SHARE $

35

0TH SHARE $

HABERSHA SR 17 FR 3-LANE@ SUTTON HILL CR TO SR 115 122440 RECONSTRUCTION, WIDENING FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE : 1.00 MANAGER: L. OWENS (M)

CONG.DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW 1996 CONST

UNDERffAY $ 243 AFTER 96

q:nrr.111 flFT/IRTMF.IIT or TR/INSr<1RT/ITION ST/ITF. TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 190

COUNTY P.t.NO,

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL YEAR

COST ESTS

RASERSRA ANTIOCH RD/CR 117 FH SR 17 TO SR 17 ALT

----------------------------------P-E--1-9-9-2--- UNDERWAY

131080 RECONSTRUCTION, WIDENING, NO LANE ADDITION PROPOSED.

CONG .DIST, 9

ROW 1989 UNDERWAY

PROJECT MILEAGE : 4.00

CONST

AFTER 96

MANAGER: L, OWENS (H)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADHIN FUNDS

RABERSHA SR 105/US 441 B FH HAIN ST NW TO SR 365 (' 1-WAY PAIR) 132100 RECONSTRUCTION' WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE I 1.63 MANAGER: L. OWENS (H)

CONG DtST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW 1991 CONST

UNDERWAY UNDERWAY AFTER-96

RABERSHA CR 63/CHASE RD@ SOUTHERN RR
170498 REPLACEMENT or TRE EXISTING BRIDGES(S). FROH 1 TO 2 LANES.
PROJECT MILEAGE 1 ,18 MANAGERI L. OWENS
RABERSRA CR 97/WELCOHE ROHE CHURCH RD OVER SOUTHERN RR NE HT AIRY
170890 'REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .27
MANAGER: L, OWENS
RABERSHA CR 94/NANCY TOWN RD OVER SOUTHERN RR NE or HT AIRY 170891 REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .24
MANAGER: L. OWENS

CONG DtST, 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST, 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL-HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1991 UNDERWAY ROW LOCL
CONST 1994 $ 530 FED. SHARE$ 424
GA, SRARE $ 106 0TH SRARE $

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 462

FED SHARE$ 370

GA. SHARE$

92

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 404

FED SHARE$ 323

GA, SHARE$

81

0TH SHARE$

,.



C



~

~

= = ~ ~ ~ ~ !@~~!!!9 !!f!f:~ ~'.,,~ ~~ !fl!!r.:.~ ~ ~~$) t~~:.:::~~ A

-- ~ :~.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPI\RTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

RALL 1B102J

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RALL MANAGER! STEVE ~ISR

CONG DIST. 9
FUND SOURCE! RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

RALL 1B102.

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RALL MANAGER: STEVE ~ISR

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

RALL 1Bl025

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RALL MANAGER: STEVE ~ISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT .ADMIN FUNDS

RALL 1C202J

TWO STANDARD VANS AND TWO MOBILE RADIOS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HALL MANAGER: STEVE KISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT. FEDERAL TRANSIT ADMIN FUNDS

HALL 1C202.

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: RALL MANAGER: STEVE ~ISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

HALL lC2025

ONE STANDARD VAN AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: RALL MANAGER: STEVE KISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

RALL 110400

I-985 SPLIT DIAMOND INTERCHANGE@ SR 13, SR 53, CO SYSTEM
INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 3.10 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: RON BRAZIEL (M)

CONG. DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

c,,



16-Sep-1993 Page 191

FISCAL .. COST

YEAR .

ESTS

------------------

OPERATING 1994

$

175

FED SHARE$ 100

GA. SHARE$

0TH SHARE$

76

OPERATING 1995 $ 185

FED SHARE$ 105

GA. SHARE$

0TH SHARE$

80

OPERATING 1996 $ lH

FED SHARE$ 111

GA. SHARE$ 0TH SHARE$

B

CAPITAL 1994

$

412

FED SHARE$

J.

GA. SHARE$

4

0TH SHARE$

4

CAPITAL 1995

$

21

FED SRARE $

17

GA. SRARE $

2

0TH SHARE$

2

CAPITAL 1996

$

21

FED SHARE$

17

GA. SHARE$

2

0TH SHARE$

2

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

GF'.flllt~i II f\F:rllllTMF'.ti-t or TRI\N!;l"ORTI\Ttnll
STI\TE TRANSPORTATION lHPROVEHENTS PROGRJ\M PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 192

COUNTY

DESCRIPTION

P,I.NO,

PROJECT DATA

R-A--LL------S-R---5-3-C-O-N-N---FH---SR---S-J--T-O--"--B-Y-P-A-S-S-/-G-A-I-N-E-S-V-I-L-L-E----------.

FISCAL

COST

------------------C-O-M-M-E-N-T-S---------------------------P-EY-E-A1-R9-9--2~. ~-U-!NS-DT-ER-SW--AY

121590 UCONSTRUCTION I WIDENING FROM 2 LANES TO 4 LANES,

FONG DIST. 9

RO" 1992 UNDERWAY

PROJECT MILEAGE : ,80

.

CONST 1994 $ 144t

MANAGER! R, ASff:HOM

FUND SOURCE: NAT'L RIGR"AY

FED SHARE$ 115t

FEDERAL HIGH"AY ADHIN FUNDS

GA, SHARE$ 2tO

'

OTR SHARE$

HALL 121U0

SR 53/HCEVER RD FH MUNDY HILL RD NE TO SR 369 RECONSTRUCTION I "IDENINO FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2,50 MANAGER! L, OWENS

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FE~ERAL HIGHWAY ADHIN FUNDS

PE 1993 ONOERWAY

ROW 1993 ONOER"AY

CONST 1994

$ 61941

FED SHARE $ 4955

GA, SHARE $ 1239

0TH SHARE $

RALL 12U20

SR 53C REL/GAINESVILLE FH SR 53C/" BYP TO SR 13/SR 60
CONSTRUCTION or NE" ROUTE "ITH 4 LANES PROPOSED.
PROJECT MILEAGE: ,90
MANAGER: BILL MOSKAL

CONG DIST, 9
FUND SOURCE! NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ONOER"AY RO" 1992 UNOER"AY CONST 1994 $ 5429
FED SHARE $ 4343 GA. SHARE $ 1086 0TH SHARE $

HALL 12167X

P'TREE IND BLVD FH SR 20/SUGAR HILL TO SR 347/SEE GWINNETT

UNICNOWN / UNKNOWN

,

PROJECT MILEAGE : ,00 - EXIST. LANES! 0 /PROPOSED LANES: 0

MANAGER: R, ASHMORE

PE NONE $

0

CONG DIST, 9

RO" NONE $

0

CONST 1995 $

0

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

FEDERAL HIGHWAY ADHIN FUNDS

GA, SHARE$

121676 IS AN ASSOCIATED PROJECT.

0TH SHARE$

RALL 121780

SR 53/DA"SONVILLE RWY FH CR 248@ SARDIS E TO LARE RANCH CT RECONSTRUCTION 5 "IDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 1,80 MANAGER! K FULBRIGHT (H)

CONG DIST, 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW CONST,

UNDER"AY AFTER 96
AFTER 96

HALL 121810

SR 11/US 129 FH 0.4 HIS/SR 323 TO 0.3 HI S/CR 719 RECONSTRUCTION I "IDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 2,70 MANAGER: L. OWENS

HALL 122010

SR 369/BROWN'S BR RD FH FORSYTH CO LINE TO SR 53 RECONSTRUCTION, ."IDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 4.93 MANAGER: R. ASHMORE(HI

CONG DIST. 9 FUND SOURCE! NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 UNDER"AY ROW 1993 UNDERWAY
CONST 1995 $ 3249 FED SHARE $ 2599 GA. SHARE $ 650
0TH SHARE $

PE.1992 RO" CONST

UNDER"AY AFTER 96
AFTER 96

:~: : .

.

, ...... ,

11.11

~

9!fB

~

~

~

~

~~~

~

~

. tt,::;.i-):;~ ~

~

f.iit"'I~

(~-;;--.,.-.-.

........ ~,.-~.,-.-,

C)I

I:'-

GEORGIA OEPMTMENT OF TRANSPORTATION STAT.E TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep.:1993 Page 193

-------------------------- ---------------------------------------------------------------------------------------- COUNTY
P.I .NO.

DESCRIPTION PROJECT OATA

RALL 122020

SR 53 FH LANIER RACEWAY/RO ATLANTA TO I-985 RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.52 MANAGER: H. REYNOLDS (M)

COMMENTS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT.

FISCAL. YEM
PE 1992 ROW CONST

COST ESTS
UNDER,rAY AFTER 96 AFTER 96

FEDERAL HIGHWAY AOHIN FUNDS

RALL 122030

MCEVER RO FM S/CR 396 NE TO SR 53/HUNOY HILL RO
RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.20
MANAGER: R. ASHMORE(M)

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW LOCL CONST

ONOER,rAY AFTER 96

RALL 122060

SR 11/CLEVELANO HWY FM LIMESTONE RO TO NOPONE RD/, SIGNALS RECONSTRUCTION' WIDENING FROM 2 LANES ,TO 4 LANES. PROJECT MILEAGE : 5.13 MANAGER: RON BRAZIEL (H)

RALL 12206t

SR 11 @ CHATTAHOOCHEE RIVER RERAS. OF THE EXISTING BRIOGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .16 MANAGER: RON BRAZIEL (H)

CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 122066 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW CONST

ONDER,rAy
AFTER 96 AFTER 96

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

HALL 122066

SR 11@ EAST FORK LITTLE RIVER RERAS. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .07 MANAGER: RON BRAZIEL (M)

RALL 12215X

SR 11/US 129 FH S4 332/JACKSON TO SR 323 ... SEE JACKSONCO
UNKNOWN_/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: TONY DUKE

HALL 122220

SR 11/CLEVELAND HWY FM NOPONE RO/CR 65 TO SR 284/, RIVER BR

RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.

I

PROJECT MILEAGE : 5.93

MANAGER: RON BRAZIEL (M)

CONG OIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS 122060 IS AN ASSOCIATED PROJECT.

PE 1992 ROW NONE CONST

ONDER,rAY

$

0

AFTER 96

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS 122150 IS AN ASSOCIATED PROJECT.

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

CONG DIST, 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

I ;r:up,; I/\ r,r:r /\RTMf.llT OF TR/IJISf'ORT/\T !Otl
ST/\TE TR.AJISPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 194

R-CPA-OL-. UL-I.N-NT-OY--. -s-R---1-1/-U-S---1-2-9--FHDP-R-E-OSSR-CJE-RC-2I8-TP4-T/-ICDO-ALN-TE-AR-M-O--N--T-O--C-L-E-V-E-L-A-N-D--B-Y-P-/-W-H-I-T-E--C-O----------------C-O-M-M-E-N-T-S--------------------------PF-EIYS-EC-A1-AR9-L9-2---.-.-U-NEC-DSO-ETSR-STW--AY

122240 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST, 9_

ROW

AFTER 96

PROJECT MILEAGE : 7. 60

.

.

CONST

AFTER 96

MANAGER: RON BRAZIEL (H)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADHIN FUNDS

RALL 132020

SR 53/HUNOY HILL RO FH NEAR I-985 TO MCEVER RO RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.40 MANAGER1 L. OWENS

RALL 132200

SR 211 N/BARROW CO LINE@ MULBERRY RIVER

REPLACEMENT OF THE EXISTING BRIOGES(SI. NO ADDEO LANES,

PROJECT MILEAGE : ,20

.

MANAGER: L. OWENS

HALL 132230

SR 51 RELOC nt HAIN ST ALONG ATHENS ST/HOON OR TO SR 51 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED, PROJECT MILEAGE: ,21 MANAGER: L. OWENS

RALL 141840

SR 283 AT BRITT WHITMIRE ROAD RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE: .00
MANAGER: L. OWENS

RALL 150140

SR 13/PEACHTREE RO@ SOUTHERN RR
REPLACEMENT or THE EXISTING BRIOGES(SI. NO ADDEO LANES.

PROJECT MILEAGE: ,40

.

MANAGER: L. OWENS

HALL 150200

SR 53 FM SR 369/BROWNS BRIDGE RO TO SR 53 CONN RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 2.10 MANAGER: BILL MOSKAL

CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEOERAL'HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: HWY. -SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1992 UNDERWAY CONST 1994 $ 3299
FED SHARE$ 2639 GA, SHARE$ 660
0TH SHARE$

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994 $ 930

FED SHARE$ 744

GA. SHARE$

186

0TH SHARE$

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994 $ 266

FED SHARE$ 213

GA. SHARE$

53

0TH SHARE$

PE 1994 $

10

ROW 1995 $

1

CONST 1996 $ 347

FED SHARE$ 312

GA. SHARE$

35

0TH SHARE$

PE 1985 UNDERWAY ROW 1987 UNDERWAY CONST 1996 $ 1160
FED SHARE$ 928 GA. SHARE$ 232 0TH SHARE$

PE 1993 RON 1995 CONST

UNDERWAY $ 1389 AFTER 96

r
'11
.r-

.. .c,

,

~

~

~

~

~

~~

~ .i:;~~

-<&!,;=

~ =-,1,.",;l

.. ~
Jm,!'{'cs'-c;;;,

~;.<\i~


~

~;;~;!i

~:'.::-<;-~~

:~. --~-~-

t,,, .. .
..... ,

...

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 195

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL . COST YEAR . ESTS

RALL SR 11-/-M-Y-R-T-L--E--ST---FM---S-R--1-1--T-O--E-X-I-S-T-IN--G--M-U-L--T-I--L-A-N-E-@---C-R--7-3-3-------------------------------------------------P-E--1-9-9-4-----$---- 44

150290 RECONSTRUCTION' WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 9

ROW

AFTER 96

PROJECT MILEAGE : .50

CONST

AFTER 96

MANAGER:~ FULBRIGHT (M)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

RALL 162430

FRIENDSHIP, THOMPSON MILL RO FM 1-985 TO SR 211/GWINNETT RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : 8.40 MANAGER: L. OWENS

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

. PE 1994 ROW LOCL
CONST

$

186

AFTER 96

RALL 170536

CR 928/WHITERALL RD@ NORTH OCONEE RIVER
REPLACEMENT or THE EXISTING BRIOGES(S). FROM 1 TO 2 LANES.
PROJECT MILEAGE : .03 MANAGER: L. OWENS

HALL 170730

I.ME LANIER ACCESS RO FM I-985/SR 365 TO SHORELANO OR/CR 592 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 2.10 MANAGER: ff. ASHMORE

RALL 170735

LA.KE LANIER ACCESS RD FM I-985 TO LA.KE (PH II - LANES 3 , 4) llECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 3.80 MANAGER: ff. ASHMORE

RALL 171030

CITY or GAINESVILLE-BIRE/PEOSTRIAN PATHS TO INTERCONNECT
BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

RALL 171060

RESTORE FLOWERY BRANCH RAILROAD DEPOT MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

6

ROW LOCL

CONST 1996 $

93

FED SHARE$

74

GA. SHARE $

19

0TH SHARE$

CONG DIST. 9
FUND SOURCE: I.ME ACCESS PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 17U730 IS AN ASSOCIATED PROJECT.

PE 1986 UNDERWAY

ROW 1987 UNDERWAY

CONST 1995 $ 1770

FED SHARE$ 1682

GA. SHARE$

89

OTA SHARE$

CONG DIST. 9
FUND SOURCE: LARE ACCESS PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $ ROW 1994 $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

85 2000 2916 2770
146

CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1996 $ 500
FED SHARE$ 400 GA. SHARE$ OTR SHARE-$ 100

CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW NONE CONST

$

0

AFTER 96

,:,=:,,p,: IT\ PF:rT\PTMF:tlT (lf" TPT\ll~ronT/\TJ()II
ST/IT TRAflSPORTATlON IMPROVEMENTS PROGAAH PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 196

COUNTY

D!l;SCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-R-A-L-L------PU--R-C-H-A-S-E--o-r--G-A-I-N-ESV--IL-L-E---D-E-P-O-T -----------------------------------------------------------------------P-E--N-Q-N-E-- -~$-------0

171090 MISCELLANEOUS IMPROVEMENTS/ NHANCEH!l;NT

CONG DIST. 9

ROW NONE $

0

PROJ!:CT MILEAGE: .00 - XIST. LANS: 0 /PROPOSED LANS: 0

CONST 1994 $ 295

HANAG!l;R:

FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHNAY ADHIN FUNDS

FED SRARE $ 236 GA. SHARE$

0TH SHARE$

59

,.

"

.,;

'6.i

6.

~

~

~

iH

~

@~

-i.=

~

~

~

~
I!'>-""=



~

~

1,:;,~ . -

/:;_'.A;~~

COUNTY P. I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

HANCOCK 281123

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

HANCOCK 281124

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

0)

.,,

16-Sep-1993 Page 197

FISCAL

COST

YEAR

. ESTS

------------------

OPERATING 1994 $

53

FED SHARE$

31

GA. SHARE$

0TH SHARE$

22

OPERATING 1995 $

56

FED SHARE$

32

GA. SHARE$

0TH SHARE$

23

HANCOCK 281125

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1996 $

59

FUND SOURCE: RURAL TRANSIT

FED SHARE$

34

FEDERAL TRANSIT ADHIN FUNDS

.GA. SHARE$

0TH SHARE$

25

HANCOCK 2C2123

ONE STANDARD VAN AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1994

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

HANCOCK 2C2124

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH

r_
HANCOCK ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO 2C2125 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1995

$

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADHIN FUNDS

GA, SHARE$

4

0TH SHARE$

3

CONG DIST. 11

CAPITAL 1996

$

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

41

0TH SHARE$

3

HANCOCK 231310

SR 15 OVER COPELAND CREEK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES,
PROJECT MILEAGE : ,25 MANAGER: D, GRIFFITH

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 231330 IS AN ASSOCIATED PROJECT.

PE 1993 ROW 1996 CONST

UNDERWAY

$

6

AFTER 96

r.F,npr. I/\ OF:P/\PTMF.tlT OF TIU\.NSPORTJ\T ION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 198

COUNTY P.1.NO.

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL YEAR

COST HTS

-RA-N-C-O-C-K----SR---1-5-O--V-ER---W-R-I-T-T-EN---C-R-E-E-K-------------------------. -------------------------------------------------------P-E---19-9~3-----U-N-D-ER-W--AY

231330 BRIDGES/ RECST. OR REHAB.

CONG DIST. 11

ROW 1996

PROJECT HILEAGE : .25 HJ\NAGER: D. GRIFFITH

FUND SOURCE: SURFACE TRANSPORT.

CONST

A$FTER H'

FEDERAL HIGHWAY ADHIN FUNDS

231310 IS AN ASSOCIATED PROJECT.

r.

.. ,

..

t~

,.

,t e ....

~~

~$i{~



~1.

~
r

-;,
~ I

~

~~~

)JD~$

!mt~~

~

If;!,:~ ~



i:

~

Ii':~

rr;~:~

~

.. -~~

r.-'::~

~"

COUNTY P,I,NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

HARALSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 681363 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HARALSON MANAGER: STEVE KISH

CONG DIST, 7

r.

FUND SOURCE: RURAL TRANSIT

FEDERAL TRANSIT ADHIN FUNDS

16-Sep-1993 Page 199

FISCAL .. . COST

YEAR
------------

E-S-T-S---

OPERATING 1994

$

60

FED SR.ARE$

36

GA, SR.ARE $

0TH SHARE$

24

HARALSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1364 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HAAA.LSON MANAGER: STEVE KISH

CONG DIST, 7

OPERATING 1995

$

64

FUND SOURCE: RURAL TRANSIT

FED SHARE$

38

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE$

26

HARALSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 681365 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HARALSON MANAGER: STEVE KISH

CONG DIST. 7

OPERATING 1996 $

67

FUND SOURCE: RURAL TRANSIT

FED SHAR~ $

40

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

27

HARALSON ONE CONVERSION VAN WITH LIFT 6C2364 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: HARALSON MANAGER: STEVE KISH

HARALSON I-20 SAFETY IMPROVEMENTS FRM ALA STATE LINE TO SR 61/CARROLL

610910 GUARDRAIL/ TRAFFIC

.

PROJECT MILEAGE 1 22,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER!

CONG DIST. 7 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS
CONG DIST. 7 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS

CAPITAL 1995

$

32

FED SHARE$

26

GA. SHARE$

3

0TH SHARE$

3



PE NONE

$

0

ROW NONE $

0

CONST 1994

$

189

FED SHARE$ 189

GA. SHARE$

0TH SHARE$

HARALSON SR 120 BTNN BUCHANAN, DALLAS/PAULDING co ... 2 EB, 1 WB
621580 ADDITION or A PASSING LANE.
PROJECT MILEAGE: 3.87
MANAGER: BILL MCVEY (HI

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW CONST

UNOER"AY AFTER 96
AFTER 96

HARALSON CR 342/S-1618 FM SR 8/US 78/BREHEN N TO HORGAN RO/CR 346 631140 MINOR WIDEN, RESURF / RECST. OR REHAB.
PROJECT MILEAGE : 5.36 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: BILL MCVEY (H)

_CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY
$ 296 AFTER 96

,;r.nr,,:11\ pr.r./\llTHF.IIT or Tl>/\ll~PflllT/\TTt111
ST/\TF: TRJ\IISrPRT/\T.ION IMPROVEMENTS PROGRJ\H
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 200

------------------------------------------ COUNTY
P,I.NO,

DESCRIPTION PROJECT DATA

RARALSON CR J42/VINSON MTN RO FH CR CJ1143 RECONSTRUCTION & WIDENING,
PROJECT MILEAGE: 4.64
MANAGER! BILL MCVEY (HI

346/HORGAN RON TO CR 345 NO LANE ADDITION PROPOSED.

COHHe:NTS
--------------
CONG DIST, 7 .
FUND SOURCE: SURFACE TRANSPORT,

FISCAL YEAR
PE 1992 ROW 1996 CONST

COST ESTS
UNDERWAY $ 200 AFTER H

.FEOERN, HIGHWAY ADHIN rm;os

HARALSON CR 342/440 FH CR 345 N TO CR 168/PLEASANT HILL RO/POL~ CO C31145 MINOR WIDEN, RESURF / RECST. OR REHAB.
PROJECT MILEAGE : 5,28 - EXIST .. LANES: 2 /PROPOSED LANES: 2
MANAGER! BILL MCVEY (M)

CONG oisT. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER H

HARALSON SR 8 EB HP 15.8-17,31 CENTER TL HP 14.0-14,9
831170 ADDITION or A PASSINO LANE.
PROJECT MILEAGE t 2.20
MANAGER! BILL MCVEY

CONG DIST, 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992
RO" 1995 CONST

UNOER"AY $ 274 AFTER H

HARALSON SR 100 FM TALLAPOOSA TO C!DMTOWN/POL~ . WON 10 BOX CLVTS
831180 BRIDGES/ RECST, OR REHAB, PROJECT MILEAGE : 1,80 MANAOERt. BILL MCVEY (H)

CONG 01ST. 7
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADHIN FUNDS

PE 1992
ROW
CONST

UNDERWAY
AFTER 96 AFTER 96

HARALSON U1950

SR 1/US 271 REPLACEMENT

OVER SOUTHERN RAILROAD IN BUCHANAN,
or THE EXISTING BRIOGES(SI. NO ADDED

LANES.

PROJECT MILEAGE : .00

MANAGERt

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1995 ROiif
CONST

$

12

AFTER 96

AFTER 96

t

~

C>t

,..

mi~

~-a

,, . ~--

~
I ~ - I

!iii~,~

lttlC~

lt!--::;~

~

==i:,-...;,

. l!i!tI~ ~k.t;~.,

~~ - ~1

j~::S-;;~!

~f':-:f~

... ,i....



.... .. ,



GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 201

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,1.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

H--A-R-R-IS----S-T-G--2--P-A-V--IN-G---FM---N--O-F--S-M-IT-H---R-O--T-O--S--O-F--S-R--1-1-6-/--1-0.,-1-4--H-I---------------------------------------------

----------------------

Pl!: NONE

$

0

310043 RIDING SURFACE REHABILITATION. SURFACE, GRIND,-SEAL, STRIPE ETC.CONG DIST. 3

ROW NONE $

0

PROJECT MILEAGE: 10.14 - EXIST. LANES: 0 /PROPOSED LANES: 0

.

CONST 1994 $ 3350

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE CONST.

FED SHARE$ 3015

.

FEDERAL HIGHWAY AOMIN FUNDS

GA. SHARE$ 335

0TH SHARP!$

HARRIS 310083

STG 2 PAVING FH S OF SR 116/TO SR 18/ 8.54 HI

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 3

PROJECT MILEAGE : 8,54 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE CONST.

FEDERAL HIGHWAY AOHIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 2888 2599 289

HARRIS 310283

STG 2 PAVING FM S OF SR 18/HMRIS TO S OF US 27/TROUP CO

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 3

PROJECT MILEAGE : 8.00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE CONST,

FEDERAL HIGHWAY AOHIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$ 0TH sHARE $

0 0 3237 2913
324

HARRIS 311710

CALL BOXES ON I-85 FM ALABAMA TO SR 74/FULTON MISCELLANEOUS IMPROVEMENTS/ NEW CONSTRUCTION PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 7 , 3
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY AOMIN FUNDS

HARRIS 31172X

CALL BOXES ON I-185 FM SR 22/HUSCOGEE TO I-85 . SEE MUSCOGEE UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 3 , 7
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY AOMIN FUNDS

PP! 1994 $

20

RO" NONE $

0

CONST 1996 $ 700

FED SHARP!$ 630

GA. SHARP! $

70

0TH SHARP!$

PE 1994 $

o

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA, SHARE$

0TH SHARE$

HARRIS 331590

SR 116@ SPARKS CREEK W OF SR 85W REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ONOP!R"A'f

ROW 1994 $

15

CONST 1995 $ 273

FED SHARE$ 218

GA, SHARP! $

55

0TH SHARE$

HARRIS 342780

SR 1/US 27@ SR 354 IN PINE MOUNTAIN INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE: ,48 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: GORDON BROWN

CONG DIST. 3 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS

PE 1994 ONDER"At

ROW LOCL

CONST 1995 $ 220

FED SHARE$ 198

GA, SHARE$

22

0TH SHARE$

r.r,np,: I/\ r,,=:r /\RTMF.tlT OF Trt/\tlSPORT/\T l(lN ST/\TE TRANSrORT/\TION IMPROVEMENTS PROGRJ\H PROJECT LISTING BY COUNTY FY 199./FY 1996

16-Sep-1993 Page 202

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL YEAR

COST
l!!STS

R--A-JU-l-IS----S-R--8-5--9--C-E-N-T-R-A--L--C-H-U-R-CH---R-O-A-D-/-C-R--1-8-7---------------------------------------------. --------------------------P-l-!!-N-O-N-I-!!-~--$------O

32820 TURN LANES/ TRAFFIC

CONG DIST. 3

Ro,r NONI!! $

o

PROJECT MILEAGE : .14 - EXIST, LANES! /PROPOSED LANES: 5

.

CONST 199. $

55

HANAG!Rt GORDON BROWN

FUND SOURCE: HWY, SAFETY

FED SHARE$

50

FEDERAL RIG~"AY ADHIN FUNDS

GA, SHARE$

6

0TH SHARE$

RAJUlIS 371220

CR 268/~ING GAP ROAD@ CRAWFORD CREE~ NEAR MERIWETHER COLN
REPLACEMENT or TRE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT HILl!!AGE 1 ,20
HANAG!Rt GORDON BROWN(H)

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL RIGH"AY ADHIN FUNDS

Pl!! 1994

$

10

Ro,r LOCL

CONST 1996 $ 337

FED SHARE$ GA, SHARE$

270
n

0TH SHARE$

l

... ,,

,, ,

l1 I

~

~

~

~

~

~

~~!!ll

-1),\Qj

Wit,

~~ ~J.~

.,

C-:

~

1!$,.'i-1~

1t:'., :::~,

\:-:-- - ~-

f r "

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

RAAT 181028

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HART MANAGER: STEVE RISH

CONG DIST, 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

.

'

16-Sep-1993 Page 203

FISCAL , COST

YEAR

ESTS

------------------

OPERATING 1994 $

35

FED SHARE$

19

GA, SHARE $

OTR SHARE$

u

RAAT 181029

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RAAT MANAGER! STEVE RISR

CONG DIST. 10

OPERATING 1995 $

38

FUND SOURCE: RURAL TRANSIT

FED SRAAE $

20

FEDERAL TRANSIT ADHIN FUNDS

GA. SRAAE $

OTR SHARE$

18

RART 181030

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HAAT MANAGER: STEVE RISH

CONG DIST. 10 r.

OPERATING 1996 $

u

FUND SOURCE: RURAL TRANSIT

FED SRAAE $

22

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

19

HART 1C2028

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HART MANAGER: STEVE RISH

CONG DIST. 10

CAPITAL 1994

$

31

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

HART 121430

SR 77 NB FM CEDAR CRR TO CR 23 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.33 MANAGER: L. OWENS

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

929

FED SHARE $ 743

GA. SHARE $ 196

0TH SHARE $

HART 131020

SR 77/PASS & TURN LANE & INTERSECT IHPR 9 SR 51 ADDITION OF A PASSING LANE. PROJECT.MILEAGE : 1.90 MANAGER: L. OWENS

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW 1993 UNDERWAY CONST 1994 $ 903
FED SHARE $ 722 GA. SHARE $ 191 0TH SHARE $

HART 132130

S HARTWELL BYP FM SR S1/SR 366 TO SR 8/CR 403 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : 5.20 MANAGER: RON BRAZIEL (HI

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

COUNTY P,!.NO,

DESCRIPTION PROJECT DATA

r.F.ORr.JA OF.PARTMENT or TPANSrORTATION STATE TRJ\IISPORTATIOII IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

AMT
132150 .

SR 77 FH SR 77 C TO SR 59:EB HL 17.41 TO HL 18,78 HINOR WIDEN, RESURF / RECST, OR REHAB. PROJECT MILEAGE : 4.83 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER! L, OWENS .

CONG D)ST, 10 .
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIH FUNDS

KART 132160

SR 77 FM SR 51 TO SR 77C:FH HP 13.72-15.0:WB HP 11,0-17,0
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 5.20 MANAGER: L. OWENS

CONG DIST~ 10
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY AOHIN FUNDS

AMT 141850

SR 51 AT CR 503 AND CR 405 TURN LANES/ TRAFFIC PROJECT MILEAGE : , 00 - EXIST. LANES: .0 /PROPOSED LANES: 0
MANAGER:

CONG.DIST, 10
FUND SOURCE: HWY. SAFETY. FEDERAL HIGHWAY AOHIN FUNDS

AMT 1708U

CR 240/GRIFFIN RD OVER LITTLE SHOAL C~ NE OF BOWERSVILLE REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES,
PROJECT MILEAGE: ,10 MANAGER: L, OWENS

CONG DIST, 10
FUND SOURCE: BRIDGE PRO~RAM FEDERAL HIGHWAY AOHIN FUNDS

HAAT 170843

CR 245 9 SHOAL CREE~ 6,5 HI NE OF BOWERSVILLE
REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE: .22 MANAGER:

HART 171080

CITY OF HARTWELL COURTHOUSE SQUARE

r

SIDEWAL~S / ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0

MANAGER:

CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOHIN FUNDS
CONG DIST, 10 FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY AOHIN FUNDS

16-sep-1993 Page 204

FISCAL

COST

YEAR

ESTS

P-B---1-9-9-3-.----U-N-DE-R-W--AY

ROW 1993 UNDERWAY

CONST 1995 $ 1236

FED SHARE$ 989

GA, SHARE $ 247

0TH SHARE 9

PE 1993 UNDERWAY

ROW 1994 $ 233

CONST 1996 $ 2271

FED SHARE $ 1817

e GA. SHARE $
0TH SR.ARE

454

PE NONE $

0

ROW 1995 $

1

CONST 1996 $

58

FED SHARE$

52

GA. SHARE$

6

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1994 $ 225

. FED SHARE $ 180

GA., SHARE$

45

0TH SHARE$

PE 1994 $

11

ROW LOCL

CONST 1996 $ 363

FED SHARE$ 290

GA, SHARE$

73

0TH SHARE$

PE LOCL

ROW NONE $

.0

CONST 1996 $

21

FED SHARE $'

17

GA. SHARE$

0TH SHARI!!$

4

l

.., it

....
... .

~

ilf!!

~
,t'

~,,.

~ ~

~ ~

Hi~~

~

~

~~;~~! ~:il.:"!'i~

'

11

~1~

~~

~;:;fili._'il

it,''r::c+a

,i-;'_,...:,.
....



GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT. LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 205

COUNTY

DESCRIPTION

FISCAL COST

P,I.NO,

PROJECT DATA

COMMENTS

YEAR

P.:STS

HENRY COUNTY OPERATED PUBLIC TRANSIT SERVICE

---------------------------------------------

381229 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 3 , 11

FUNDS RECIPIENT: HENRY MANAGER: STEVE KISR

OPERATING 1994 $

59

FUND SOURCE: RURAL TRANSIT

FED SHARE$

35

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

OTR SHARE$

24

HENRY 381229

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HENRY MANAGER: STEVE KISH

CONG DIST. 3 Ii 11

OPERATING 1995 $

61

FUND SOURCE: RURAL TRANSIT

FED SHARE$

36

FEDERAL TRANSIT ADHIN FUNDS

GA. SRARE $

0TH SHARE$

25

HENRY 381230

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HENRY MANAGER: STEVE KISH

CONG DIST. 3 Ii 11

OPERATING 1996 $

63

FUND SOURCE: RURAL TRANSIT

FED SHARE$

37

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

26

HENRY 3C2229

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HENRY MANAGER: STEVE KISH

CONG DIST. 3 Ii 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

CAPITAL 1995

$

20

FED SHARE $

16

GA. SHARE,$

2

0TH SHARE$

2

RENRY 3C2230

ONE CONVERSION VAN WITH LIFT ANO ONE STANDARD VAN

TRANSIT FACILITIES/ CAPITAL

.

FUNDS RECIPIENT: HENRY

MANAGER: STEVE KISR

CONG DIST. 3 Ii 11

CAPITAL 1996

$

52

FUND SOURCE: RURAL TRANSIT

FED SRARE $

42

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

0TH SHARE$

5

HENRY 3V1031

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN RENRY COUNTY
MANAGER: STEVE KISH

CONG DIST, 6 Ii 4

CAPITAL 1994

$

11

FUND SOURCE: ELDERLY Ii DISABLED FUND FED SHARE$

9

FEDERAL TRANSIT ADHIN FUNDS

GA, SHARE$

1

0TH SHARE$

1

HENRY 3V1032

ELDERLY ANO DISABLED VEHICLES AND EQUIPMENT

TRANSIT PROJECTS/ CAPITAL

r

FUNDS RECIPIENT: AGENCIES IN HENRY COUNTY

MANAGER: STEVE KISH

CONG_OIST. 6 Ii 4

CAPITAL 1995

$

11

FUND SOURCE: ELDERLY Ii DISABLED FUND FED SHARE$

9

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

r.F.011,;1/\ [IF.P/\PTMF.IIT or TPJl.tlSPORT/\TION
ST/\Tr, TR/\NsroRTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 206

COUNTY P.I.NO.
-H-EN-R-Y------E-L-D-ER--LY---A-N-D

DESCRIPTION PROJECT DATA
DISA-B-LE-D---V-E-H-IC--LES

AND

FISCAL

COST

COMMENTS

YEAR

ESTS

EQUIPM-E-N-T----------------------------------------------------------------------.---------

JV1033 TRANSIT PROJECTS/ CAPITAL

CONQ DIST. 6 & 4.

FUNDS RECIPIENT: AGENCIES IN HENRY COUNTY MANAGER! STEVE KISH

CAPITAL 1996

$

12

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

10

FEDER.AL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

HENRY 310976

I-75 FM 1-675 TO SR 7/US 41/CLAYTON (NOISE BARR. , LIGHTING)

WALLS/ RECST, OR REHAB,

-

PROJECT MILEAGE : 7,80 - EXIST, LANES: 2 /PROPOSED LANES: 4

MANAGER: J, GRAYBEAL

ATLANTA TIP I CL-R 12
CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 31097X IS AN ASSOCIATED PROJECT.

PE 1996
ROW NONE CONST

$

79

$

0

AFTER 96

RtNRY 311120

SR 20/SR 81 OVER I-75 BRIDGES/ RECST, OR REHAB, PROJECT MILEAGE: ,30 MANAGER: J. GRAYBEAL

HENRY 321145

N-S 1-WAY PAIR/MCDONOUGH FH N/RACETRACK RD TO N/CARHICAEL ST
CONSTRUCTION or NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : 1.20 MANAGER: N, PASSMORE (HJ

HENRY 321520

SR 20 FM NEAR I-75 TOE or SOUTHERN RR/MCDONOUGH
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 2.10 MANAGER: J, GRAYBEAL

ATLANTA TIP I RE 1 CONG DIST,. 3
FUND SOURCE: I-STATE HAINT, FEDERAL HIGHWAY ADHIN FUNDS

ATLANTA TIP I HE 10

CONQ DIST, 3

/

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

ATLANTA TIP I RE 1 CONG DIST, 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE.1987 UNDERWAY ROW 1994 $ 1500 CONST 1996 $ 1863
FED SHARE $ 1677 GA. SHARE $ 186 0TH SHARE $

PE 1992 -UNDERWAY ROW 1996 $ 650 CONST 1996 $ 660
FED SHARE $ 529 GA, SHARE $ 132 0TH SHARE $

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

HENRY 322050

SR 42 FM SR 138/STOCKBRIDGE N 1-675 INCL CULVT/CLAYTON RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 2.20 MANAGER: H, REYNOLDS (HJ

ATLANTA TIP I CL64/HE5
CONG.DIST. 3
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 9fi AFTER 96

HENRY -322680

SR 20/SR 81 AT PHILLIPS DRIVE IN MCDONOUGH INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE: ,25 - EXIST, LANES: 2 /PROPOSED LANES: 2
HAN~GER:

ATLANTA TIP I HE 1 CONG DIST. 3 .
FUND SOURCE: HNY. SAFETY FEDERAL-HIGHWAY ADHIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1996 $ 128

FED SHARE$ 115

GA. SHARE$

13

0TH SHARE.$

... ,..
l

~

~

,, ~- == = ~

,,

~

~

~~ll~i&J

~

~~

\f,'~!~

=,
~

~

~fi~~'i

t~?-~-;-;



GEORGIA OF.PARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 207

COUNTY P,I.NO,

DESCRIPTION PROJECT DATA

HENRY

1-"AY PAIR/MCDONOUGH FH E SOUTHERN RR TO REYS FERRY RO

FISCAL . COST

COMMENTS

YEAR

ESTS

ATLAN-T-A--T--IP--I--R-E--8-----------------------PE---1-9-9-3-----U-N-DE-R-W--AY

331370 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.

CONG DIST, 3

ROW LOCL

. PROJl:CT MILEAGE : , 30 MANAGER: N. PASSMORE (H)

CONST 1996

$

55t

I

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

U3

.

FEDERAL HIGHWAY ADHIN FUNDS

GA, SHARE $

111

OTR SHARE$

HENRY 33152X

SR 155 NB 11,8-0.25 HENRY;SB 1.6-3.1/SEE SPALDING UNRNOWN / UNRNOWN PROJECT HILll:AGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 331520 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1996 CONST

UNDERWAY

$

0

AFTER 96

HENIIY 331550

SR 20 EB FH HP 14.41 TO 13.211 "8 HP 13.28 TO 11.74 ADDITION OF A PASSING LANE, PROJECT MILEAGE : 2.67 MANAGER: GORDON BROWN(H)

ATLANTA TIP I HE 11
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

380

AFTER 96

HENRY 331980

JONESBORO RO/CR 655 FH I-75 TO ENO 1-WAY PAIR IN MCDONOUGH RECONSTRUCTION, WIDENING FROM 2 LANll:S TO 4 I.ANES. PRO.JECT MILEAGE : 3.20 MANAGER: N. PASSMORE (H)

ATLANTA TIP f HE 7 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS

PE 1995 ROW LOCL CONST

$

20

AFTER 96

HENRY 370940

CR 290/S HAMPTON RO OVER TOWALIGA RIVER SE HAMPTON REPLACll:HENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES. PROJl:CT MILEAGE : .50 MANAGER: GORDON BROWN

ATLANTA TIP f RE 15 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96"

Hll:NRY 370941

CR 132/TURNER CHURCH RO OVER WALNUT CREER TRIBUTARY REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: GORDON BROWN

HENRY 72148X

SR 138 FH WALT STEPHENS RD/CLAYTON TO I-75 ,SEE CLAYTON CO
UNRNOWN / UNKNOWN PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: RON BRAZIEL

ATLANTA TIP f HE 16 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOHIN FUNDS
ATLANTA TIP f CL 31 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS 721480 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW LOCL

CONST 1995

$

259

FED SHARE$

207

GA. SHARE$

52

0TH SHARE$

PE 1992 RON 1996 CONST

UNDERWAY

$

0

AFTER 96

~~np~rA P~PAPTM~NT OF TPANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRJ\H PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 208

COUNTY

DP.:SCR IPT ION

FISCAL

COST

P,I.NO.

PROJECT DATA

COHHP.:NTS

YEAR

R--!N-R-Y-----P-A-N-O-L-A--R-D---FH---ST-A-G-E-C-O-A-C-H---R-O--T-O--F-L-M-P-.:-S--H-I-L-L--R-O-/S-E-P-.:--C-L-A-Y-T-O-N----------A-T-L-A-N-T-A--T-I-P--f--C-L-1-6-/H--E-4------------------P-E--1-9-9-5---

-P-.-:S-T-S --

$

0

1l092X RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.

CONG DIST. 3

RO" LOCL

PROJECT HILP.:AGE : .00

CONST

AFTER 9li

HANAGP.:R: UNKNOWN

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY AOHIN FUNDS

730920 IS AN ASSOCIATED PROJECT.

,,

. . "

~

~

~ ,, ..~"

~

~

m~~

~

~

M!li':!1~2B

M::.!!S!

~

~

~

I~

-.
~i:f.:..; ti~

J,,,-~ ... :,~
-

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 209

COUNTY

DESCRIPTION

FISCAL COST

P,I.NO,

PROJECT DATA

COMMENTS

YEAR . , ESTS

H-O-U-ST-O-N---E-L-D-E-R-L-Y--A-N-D---D-IS-A-B-L-E-D---V-E-H-I-C-L-E-S--A-N-D--E-O-U-IP-M--E-N-T-----------------------W-.--R-O-B-I-N-S--T-I-P--f--1---1-6-(-1-)---------------------------------

3Vl013 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 2 , 8

FUNDS RECIPIENT: AGENCIES IN W, ROBINS MPO AREA MANAGER: STEVE KISH

CAPITAL 1994

$

15

FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$

12

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

HOUSTON 3V1014

ELDERLY AND DISABLED VEHICLES ANO EOUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN W, ROBINS HPO AREA MANAGER: STEVE KISH

W. ROBINS TIP f 1-16(1)

CONG DIST. 8 , 2

CAPITAL 1995

$

15

FUND SOURCE: ELDERLY, DISABLED FUND FED SRME $

12

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

HOUSTON 3V1015

ELDERLY AND DISABLED VEHICLES ANO EOUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN" ROBINS MPO AREA MANAGER: STEVE KISH

W. ROBINS TIP f 1-16(1)

CONG DIST. 8 , 2

CAPITAL 1996

$

u

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

13

FEDERAL TRANSIT AOHIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

HOUSTON 311650

1-75@ GAINES DRIVE IN PERRY FENCE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 2
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY AOHIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

25

FED SHARE$

25

GA. SHARE$

0TH SHARE.$

HOUSTON 321590

SR 26 OVER ELKO CREEK REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE: .19 MANAGER: GORDON BROWN

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE 1990 UNDERWAY, ROW 1993 UNDERWAY
CONST 1994 $ 770 FED SHARE $ 616 GA. SHARE $ 154 0TH SHARE $

HOUSTON 322460

SR 96 FH US 129@ BONAIRE TO SR 87/TWIGGS (INCL 5 BRIDGES) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 9,32 MANAGER: RON BRAZIEL (H)

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS

PE 1994 ROW 1995 CONST

$ 538
$ 729 AFTER 96

HOUSTON 322560

I-75 AT NEW WEST PERRY BYPASS SOUTH OF PERRY INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 4 MANAGER: RON BRAZIEL
/

CONG DIST. 2 , 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS

PE 1993 UNOER"AY ROW 1995 $ 250 CONST 1995 $ 4800
FED SHARE $ 3840 GA. SHARE $ 960
0TH SHARE $

r.r.nrr.111 r>F:rl\RTMF:NT OF' TMNSrORTl\TION STl\TE TRAIISPORTl\TION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 210

H-CPO-O-U,1U-S.TN-NOT-ONY--, -W--P-E-R-R-Y--B-Y-P--F-H-DP-R-IE-O-S7-JCE5-RC-ITP-ST-.ID-OA-TNO-TA--U-S--3-4-1--@--M-G---IN--D-IA-N---C-it--W-/-B-R-ID--G-E-S--------------C-O-M-M-E-N-T-S--------------------------FP-BIYS-EC-A1A-R9-L9-3---.-.-O-ECN-SDO-TES-SRTWAI

322570 CONSTRUCTION OF NEW ROUTE WITH t LANES PROPOSED,

CONG DIST, 2, 8

ROW LOCL

PROJECT MILEAGE : 5. 60



'>

MANAGER: RON BRAZIEL

FUND SOURCE: SURFACE TRANSPORT,

CONST

AP'TBR H

FEDERAL HIGHWAY ADMIN FUNDS

HOUSTON WEST PERRY BYPASS: FH AIRPORT RO TO I-75
322590 RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : ,95 MANAGER: GORDON BROWN

HOUSTON 331750

HOUSTON RD FM SR 11 TO WALDEN/SMDISt , BIBB SPLIT UA $ MINOR WIDEN, RESURF / RECST, OR REHAB. PROJECT MILEAGE : 1.90 - EXIST. LANES: 0 /PROPOSED LANES: 2
MANAGER! GORDON BROWN

CONG DIST. 9 ' 2 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
W, ROBINS TIP I 1991-1
CONG DIST, 9, 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1994 UNDERWAY ROW LOCL
CONST 1994 $ 750 FED SRMB $ 600 GA. SHARE$ 150 0TH SHARE$

PE 1992 ROW LOCL CONST

ONDERWAY AFTER H

HOUSTON HOUSTON I.ME RO FM SR 127@ CR 279 TO SR 96/, INTER@ CR 199 331930 RECONSTRUCTION, WIDENING FROH 2 LANES TO 5 LANES.
PROJECT MILEAGE I .4 ,00 MANAGER: R. ASHHORE(HI

W. ROBINS TIP I 1992-1 CONG DIST, 9
FUNO SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER H

HOUSTON SR 127 FM PERRY CITY LHTS TO CR 279/BEM BRANCH RD
331960 RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES, PROJECT MILEAGE : 3.21 MANAGER: RAY METTS (Ml

HOUSTON
3]1965

SR 127@ MOSSY CREE!t.,.W/331960 REHAB. or THE EXISTING BRIDGE(SI. FROM 2 LANES TO 4 LANES. PROJECT:MILEAGE : .03 MANAGER: RAY METTS (Ml

HOUSTON SR 26 OVER GA SOUTHERN AND FLA RAILROAD 332120 REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE : .42 MANAGER: GORDON BROWN

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN F.UNDS 331965 IS AN ASSOCIATED PROJECT.
W. ROBINS TIP I 1993-5 CONG DIST. 9.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 331860 IS AN ASSOCIATED PROJECT.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

291

$ 753

AFTER 96

PE 1994 ROW NONE CONST

$

10

$

0

AFTER 96

PE NONE $

9

ROW 1993 UNDERWAY

CONST 1994 $ 952

. FED SHARE $ 692

GA. SHARE $ 170

0TH SHARE $

.. ;,

...

1fi I.

,, .~:.~mn SM ~ ~ ~,, ~ ~

~Mffil

~ . /}~!!~

~-~

~

ffid,::tll

J;;-:.., ' :.-.:

i'''

..

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 211

COUNTY P.I,NO.

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL. YEAR

COST ESTS

H--O-U-ST-O-N---S-R--2-6--O-V--ER---BU-R-N-H-A-M---B-R-A-N-C-H-------------------------------------------------------------------------------P-E--N-O-N-E-----$------0

332130 REPLACEMENT OF THE EXISTING BRIOGES(S), NO ADDEO LANES.

CONG DIST. 2

ROW 1993 UNDERWAY

PROJECT MILEAGE : .19

'-

CONST 1994

$

5i2

MANAGER! GORDON BROWN

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 410

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 102

0TH SHARE $

HOUSTON 332140

SR 26 BRIDGE OVER CATNA BRANCH REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES. PROJECT MILEAGE : .20 MANAGER: GORDON BROWN

CONG 01ST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

301

FED SHARE$ 241

GA. SHARE$

60

0TH SHARE$

HOUSTON 342340

SR 247C FM HOUSTON LARE RO TO SR 247/INCL INTER. IMPROVEMENT INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : 4.80 - EXIST. I.ANES: 5 /PROPOSED LANES: 5 MANAGER! GORDON BROWN

W. ROBINS TIP f 1985-6 CONG DIST. 8 , 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995 $ 797

FED SHARE$ 717

GA. SHARE$

80

0TH SHARE$

HOUSTON 350830

S. DAVIS OR FM RANDOLPH AVE TO N/OEMON VALLEY OR RECONSTRUCTION, WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .47 MANAGER: GORDON BROWN

W. ROBINS TIP f 1986-5 CONG DIST. 8 , 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 531 FED SHARE$ 425 GA. SHARE$ 106 0TH SHARE$

HOUSTON 350840

HOUSTON LARE RO/CR 535 FM SR 96 TO RICHARD RUSSELL PKWY RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2.81 MANAGER: H. ASRMORE(M)

W. ROBINS TIP f 1991-2 CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

HOUSTON 350900

GREEN ST FM AMERICAN BL TO N'SIDE, N'SIDE FM GREEN TO RAVEN TURN LANES / TRAFFic PROJECT MILEAGE : ,25 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: GORDON BROWN

HOUSTON 350930

SR 127 FM CR 272/RING'S CHAPEL RO TO PERRY CITY LIMITS RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .69 MANAGER: RAY METTS

W. ROBINS TIP f 1986-4 CONG DIST. 8 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 2 , 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1995 $ 652

FED SHARE$ 587

GA. SHARE$

65

0TH SHARE$

PE 1993 UNDERWAY ROW 1995 $ 717 CONST 1996 $ 1910
FED SHARE $ 1528 GA. SHARE $ 382 0TH SHARE $

~~VPGIA l>~PAPTM~NT OF TnANSPORTATION

STATE TIU\NSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY.COUNTY FY 1994/FY 1996

COUNTY

DESCR JPTION

P.I.NO.

PROJECT DATA

COMMENTS

R-O--U-!T-O-N---H--IS-T-O--R-IC---D-E-PO--T--R-E-S-T-O-R--A-T-I-O-N-,--L-IN--E-A-R--P-A-R-K--I-N--W-A-R-N-E-R--R-O-B.IN-S-------- W, ROBINS TIP f 1993-4

371020 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT

CONG DIST, 9, 2

PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0

MANAGERS CORA COOK

FUND SOURCE: TRANS, ENHANCE,

FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 212

FISCAL
- YEAR

COST
- ESTS

PE LOcL

ROW LOCL

CONST 1995 $ 2!10

FED SR.ARE$ 200

GA, SHARE$

0TH SR.ARE$

!10

..

..

,.

~ ,...

~

~

== ~



1

"

~

~

e~~

(e.~~,:ij

_, ==

~,':.'.~'!!!l

~.~~~


~ljj,c~

~~

ff?.$~rhl,S

,~~~?\-~,,~:

/~: ,.
,I!'



GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 213

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO,

PROJECT DATA

COMMENTS

YEAR !STS

-U IR--"lIl-NU -----AS-R-D-D-3I-T2-I@O-N--2-o-Lr-O-AC-A-PT-AIO-S-NS-SIN-G-IN--L-AI-RN-"E-I.N---C-O-U-N-T-Y-1--2--I-N--C-O-F-F-E-E--C-O-U-N-T-Y-----------C-O-N-G--D-I-S-T-,--8---------------------------R-OP-WE--11-99-99-23-----UU-NN-DDE-ER-RW-"A-AYY

PROJECT MILEAGE: 3,95

CONST 1994

$

925

MANAGER: J, LINDSEY

FUND SOURCE: SURFACE TRANSPORT . .

FED SHARE $ 740

FEDERAL HIGH,,AY ADMIN FUNDS .

GA, SRARE $ 185

0TH SHARE $

IR"IN t21960

SR 11/US 129@ REEDY CRR, STUMP CRR
REPLACEMENT or TRE EXISTING BRIOGES(S). NO AOOED LANES.
PROJECT MILEAGE: 1,00 MANAGER! J, LINDSEY

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PB 1992 ONDER"AY

ROW 1994 $

10

CONST 1995 $ 716

FED SHARE$ 573

GA, SHARE$ 143

OTR SHARE .$

COUNTY P.J.NO.

DESCRIPTION PROJECT DATA

r.F.nPr.111 OF.PAPTHENT or TRJ\tlSPOPTATION
STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

JACKSON 1B1078

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISR

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

JACKSON 1Bl079

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

JACKSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 1Bl080 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISH

CONG DIST, 10
FUND SOURCE: RURAL TRANSr'T FEDERAL TRANSIT ADHIN FUNDS

JACKSON 1C2078

ONE CONV, VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

JACKSON 110250

SR 11/US 129 FM !/MIDDLE OCONEE RVR TO CR. 236/INCL I-85 BR RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .45 MANAGER: H GANNAWAY (C)

CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 214

tISCAL YEAR

COST ESTS

- --~--------

OPERATING 1994 $

25

FED SHARE$

141

GA. SHARE$

0TH SHARE$

10

OPERATING 1995 $

25

FED SHARE$

141

GA, SHARE$

0TH SHARE$

11

OPERATING 1996 $

26

FED SHARE$

15

GA. SHARE$

0TH SHARE$

11

CAPITAL 1994

$

53

FED SHARE$

42

GA, SHARE$

6

0TH SHARE$

5

PE 1992 ROW 1995 CONST

UNDERWAr $ 1152 AFTER 96

JACKSON 11044Z

1-85 SIGN HOD FH DEK CL TO SC STATE LN . GWIN/BANKS/BAR/FRANK

SIGNING/ MAINTENANCE

.

PROJECT MILEAGE : 76,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

JACKSON 121340

SR 11/ US 129/@ ALLEN CREEK N OF T.a.LHO REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDEO LANES.
PROJECT MILEAGE : .25 MANAGER: L. OWENS

CONG DIST. lo_, 6 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS 110440 IS AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE NONB $

0

ROW NONE $

0

CONST 1994 $

0

FED SHARE $

GA. SHARE$

0TH SHARE$

PE 1987 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

-~

.. '.

,,

~

~

~ ~,,

~

l'.fifi

~

,~~

~.ii,IY._~

U~JO!fl l@!OJ~


I!~.!~

l\!C.t:t.1

~~:".':~:"::;.~

rc>-- ..,

COUNTY P.I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

JACKSON 121600

SR 11 FH SCL PENDERGRASS TO SR 332 / PART NEW LOCATION RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. '
PROJECT MILEAGE : 3.30 MANAGER: M GANNAWAY (M)

CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

-~-

16-Sep-1993 Pagt1 215

FISCAL_

COST

YEAR

ESTS

P-E---1-9-9-3-----U-N-DE-R-W--AY

Row

AFTER 96

CONST

AFTER 96

JACKSON 121604

SR 11 FH PROP, JEFFERSON BYP W TO S CITY LIMITS PENDERGRASS RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 2.40 MANAGER: H GANNAWAY (C)

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNOERWAY $ 3190 AFTER 96

JACKSON 122150

SR 11 FH SR 332/TALHO TO SR 323/HALL COUNTY RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 7,40
MANAGER: TONY OUM (M)

CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

JACKSON 12216X

SR 15 ALT/US 129 FH LAVENDER OR IN CLARKE CTY TO SR 330 RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES,
PROJECT MILEAGE: .00 MANAGER: RON BRAZIEL

JACKSON 122170

SR 15 ALT/US 129 FH SR 330 TO JEFFERSON BYP@ CR 104 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES, PROJECT MILEAGE: 6.70
MANAGER: R. ASHHORE(M)

CONG DIST. 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122160 IS AN ASSOCIATED PROJECT.
CONG DIST, 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE ROW 1994 CONST

$

0

$

0

AFTER 96

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

JACKSON 122510

SR 15 ALT IN JEFFERSON AT BIG CURRY CREEK
REHAB. or THE EXISTING BRIDGE(S). FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE: .15 MANAGER: L. OWENS

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

JACKSON 132040

JEFFERSON BYP FM SR15 ALT SE CL/ARCADE NW TO SRll NEAR CR229 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE: 6.93 MANAGER: H. ASHMORE

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

COUNTY ,.I.NO,

DESCRIPTION PROJECT DATA

~r.nr,r. I II l'F:rl\PTMF:IIT f\f Tf>.IINSrORTI\T lON STATE TRI\NSrORTI\TION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

16-Sep-1993 Page 216

FISCAL YEAR

COST ESTS

JACKSON SR 335 "/NICHOLSON@ NORTH OCONEE RIVER . PE 1 9 8 9 . UND!R"AY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 ______ _

132070 R!PLAC!HENT OF THE EXISTING BRIDO!S(S), NO ADDEO LANES,

COHO DIST, 10

ROW 1994 $

10

PROJECT MILEAGE : .11

.

CONST 1995 $ 800

MANAGER: L, OWENS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 640

FEDERAL HIGHWAY ADMIN FUNDS

GA, SHARE$. 160

OTR SHARE$

JACKSON 132380

INTERSECTION IHPROVEHENTS ON SR 538 SR 124/HP 3.74-3.76
INTERSECTION IHPROVEHENT / TRAFFIC PROJECT MILEAGE: ,34 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: L, OWENS

CONG DIST, 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1994 $ 275

FED SHARE$ 248

GA, SHARE$

28

0TH SHARE$

JACKSON 171000 .

CR 184 8 "A.LNUT CREEK 4 HI NORTH or BRASELTON
REPLACEMENT OF THE EXISTING BRIDGES(SJ. NO ADDED LANES, PROJECT MILEAGE: .20
MANAGER:

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

6

ROW LOCL

CONST 1996 ? $ 1H

FED SHARE$ 10

GA, SHARE$

37

0TH SHARE$

JACKSON 171001

CR 269@ CANDLER CREEK 8,5 HI NE OF TALMO REPLACEMENT OF TR! EXISTING BRIDGES(SI, NO ADDED LANES, PROJECT MILEAGE: ,20 MANAGER:

CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

19

ROW LOCL

CONST 1996 $ 630

FED SHARE$ 504

GA, SHARE$ 126

0TH SHARE$

JACKSON 171002

CR 367/WRITES BOTTOM ROAD@ WALNUT CREEK NE OF BRASELTON REPLACEMENT OF THE EXISTING BRIDGES(SI, NO ADDED LANES, PROJECT MILEAGE: ,20 MANAGER:

CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

7

ROW LOCL

CONST 1996 $ 223

FED SHARE$ 179

GA. SHARE$

45

0TH SHARE$

k

'W

.. '

11ft

tffiM

~

i,. M

~
"

~

~

~

ffl!!.I]

~

1-/)'ii!...,1\

~

~JI!~

1:.:c:!i,

tr,~W:~

t:;r.-:..":~

.,~

f:t.

GEORGIA DEPARTMENT or TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 217

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL.

COST

P,I.NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

J-E-F-F--D-A-V--S-R---19--F-H--H--eC-L-O-U-D---R-D-/C-R---3-2-1--T-O--N-O-R-T-H--o-r--H-e-C-L-O-U-D--C-I-R-/-C-R--1-4-6------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY

522660 TURN LANES/ TRAFFIC

CONG DIST. 8

ROW 1995 $ 126

PROJECT MILEAGE : .46 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST 1995 $ 365

MANAGER: PETE BLOCKER

FUND SOURCE: HWY. SAFETY

FED SHARE $ 329

FEDERAL HIGHWAY AOHIN FUNDS

GA. SHARP! $

37

OTR SHARE $

r.F.oflr. I I\ f1F.P I\RTMF.IIT OF TRJ\NSPORT I\T I ON

STATF. TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P.I.NO,

PROJECT DATA

COMMENTS

J-E-F-F-E-R-S-O--C-O-U-N-T-Y--O-P-E-R-A-T-E-D---PU--B-L-IC---T-R-A-N-S-IT -SER-V--IC-E---------------------------------------.-----

281129 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 11

I

FUNDS RECIPIENT: JEFFERSON MANAGER! STEVE KISH

FUND SOURCE: RURAL -TRANSIT

FEDERAL TRANSIT ADHIN FUNDS

JEFFERSO COUNTY OPERATED PUBLIC TRANSIT SERVICE 281129 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: JEFFERSON MANAGER: STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

JEFFERSO COUNTY OPERATED PUBLIC TRANSIT SERVICE .281130 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: JEFFERSON MANAGER! STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

JEFF!RSO ONE STANDARD VAN, ONE CONVERSION VAN/LIFT, TWO MOBILE RADIOS

2C2128 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: JEFFERSON

r:

MANAGER: STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

JEFF!RSO ON! STANDARD VAN ANO ONE MOBILE RADIO 2C2129 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: JEFFERSON MANAGER: STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

JEFFERSO RESTORE OLD MARKET HOUSE ON BROAD STREET/LOUISVILLE 270990 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 11
FUND SOURCE: TR.ANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 219

FISCAL YEAR

COST ESTS

OPERATING 1994 $

78

FED SHARE$

u

GA, SHARE$

0TH SHARE$

34

OPERATING 1995 $

82

FED SHARE$

47

GA. SHARE$

0TH SHARE$

36

OPERATING 1996 $

87

FED SHARE$

50

GA, SHARE $

0TH SHARE$

38

CAPITAL 1994

$

53

FED SHARE$

42

GA, SHARE$

6

0TH SHARE$

5

CAPITAL 1995

$

20

FED SHARE$

16

GA. SR~E $

2

0TH SHARE$

2

PE LOCL

ROW NONE $

0

CONST 1996 $ 170

FED SHARE$ 136

GA, SHARE$

0TH SHARE$

34

..

. 10-r.

1(,~

~

~

. ~:@! = ~ ~.,

&:on:_e = ,
r==.<!l

~J~~~

~

~~~

l!!!i'!~i~ ltLni":lii ~-,K:::~ ft'::-:-;;: .. :,,.. ' .-~-.,\

.,~

.~

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY '1996
COMMENTS

JENKINS 2BllJJ

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JENKINS MANAGER: STEVE RISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

16-Sep-1993 Page 219

FISCAL

COST

YEAR

11!:STS

----------------------------

OPERATING 1994

$

30

FED SHARE$

17

GA. SHARE$

0TH SHARE$

13

J!:NKINS 2811]4

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JENKINS MANAGER! STEVE RISH

CONG DIST. 11

OPERATING 1995 $

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

18

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE $

0TH SHARE$

14 -

JENKINS 281135

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JENKINS MANAGER: STEVE RISH

CONG DIST. 11

OPERATING 1996 $

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

19

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

14

JENKINS 2C2133

ONE STANDARD VAN ANO ONE HOBIL! RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: JENKINS MANAGER: STEVE RISH

CONG DIST. 11

CAPITAL 1994

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

JENKINS ONE CONVERSION VAN WITH LIFT ANO ONE MOBILE RADIO

2C2134 TRANSIT FACILITIES/ CAPITAL

FUNDS RECIPIENT: JENKINS MANAGER: STEVE RISH

I_

CONG DIST. 11

CAPITAL 1995

$

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

4

0TH SHARE$

3

JENKINS 221640

SR 23/US 25@ OGEECHEE RIVER SOUTH OF SR 17 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : 1.30 MANAGER: R FULBRIGHT (M)

CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 221645 IS AN ASSOCIATED PROJECT.

PE 1994 ROW NONE CONST

$

195

$

0

AFTER 96

JENKINS 221645

us 25@ OGEECHEE RIVER OFLW s or SR 17 REPLACEMENT or THE EXISTING BRIDGES(SI. FROM 2 TO 4 LANES.
PROJECT MILEAGE : 1.09
MANAGER: R FULBRIGHT

CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 221640 IS AN ASSOCIATED PROJECT.

PE 1994 ROW NONE CONST

$

36.

$

0

AFTER 96

1:r.npr. JI\ r,r.rl\PTMF:tlT Of' TP.I\N~rORTI\T ION

STATE TRANSPORTI\TION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

Dl!:SCRIPTION

P,I.NO.

PROJECT DATA

J-E-N-K-I-N-S---S-R--1-2-1-/-U-S--2-5--O-V-E-R--O-G-E-E-C-H-E-I-!:--RV---O-V-E-R-F-L-O-W--,--L-IT-T-L-I-!:- - BUCKHEAD CK

--

COMMENTS

2225t5 REHAB. or THI!: 1!:XISTING BRIDGl!:(SI. FROM 2 LANES TO 4 LANl!:S.

CONG DIST. 11

PROJECT HILl!:AGI!: : .00

GRIP PROJECT

MANAGER: K FULBRIGHT (H)

FUND SOURCF.: BRIDGE PROGRAM

FEDERAi, 111 :lfWI\Y AOHIN FUNDS

222540 IS AN ASSOCIATED PROJl!:CT .

16-SP.p-1993 Page 220

FISCAL YEAR
PE 1994 ROW NONE CONST

COST

--- ESTS

$ 150

$

0

AFTER 9fi

'

/ .

9

'

..... ,,,.

~

-

~

~

~

~

~

~

~ $i:'.:t.1Jffl

l'!.'1,.t:~

t!U@

~-.:::-~~.::@

f#.:i;;fi~

i;~:: .. :~

.,. ~r>

GEORGIA ~ErARTMENT OF TRANSPORTATION

16-Sep-1993

STAT TRANSPORTATION IMPROVEMENTS PROGRAM

Page 221

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO,

PROJECT DATA

COHHNTS

YEAR

!STS

J-O-N--!S-----S-R---22-/-G-A-A-Y---FH---O-LD---C-L-IN-T-O-N---H-W-Y-/-C-R--1-8--T-O--C-R--9-6---A-S-T--O-F--G-R-A-Y------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

322030 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST, 3

ROW 1996 $ 1886

PROJECT MILEAGE: 1.54

CONST

AFTER 96

MANAGER: H GANNAWAY (H)

FUND SOURCE: SURFACE TRANSPORT,

FEDERAL HIGHWAY ADHIN FUNDS

JON!S 331850

SR 18 EB HP14.85-16.l;EB HP 21,9-23.6:WB HP 17.14-18.7
ADDITION or A PASSING LANE.
PROJECT MILEAGE : 4.51 HANAG!Rt GORDON BROWN(H)

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY

$

39

AFTER 96

t

COUNTY P. I .NO.

DESCRIPTION PROJECT DATA

,:r.npr; 11\ (lf.r I\PTMF.IIT ()f" TIU111sr0RTI\T 1011 ST /\TE TIUIIISPORT I\T IOU I MPROVEHENTS PROGRI\H
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

16-Sep-1993 Page 222

FISCAL YEAR

COST ESTS

LAHM COUNTY OPERATED PUBLIC TRANSIT SERVICE

-----------------------------------------------------~-------

3B1515

TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: LAHAR COUNTY
MANAGER! STEVE ~ISR

CONG DIST. 3

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $ FED SHARE$ GA. SHARE$

42 25

0TH SHARE$

17

LAHM 3Bl5U

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: LAHAR COUNTY
MANAGER: STEVE ~ISH

CONG D1!1T. 3

OPERATING 1995 $

42

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

17

LAHAR 3B1517

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: LAHAR COUNTY
MANAGER: STEVE ~ISH

CONG DIST. 3

t

FUND SOURCE: RURAL TRANSIT

OPERATING 1996 $

45

FED SHARE$

27

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

19

LAHAR ONE CONVERSION VAN, ONE STANDARD VAN, BASE STATION, 2 RADIOS

3C2515 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 3

FUNDS RECIPIENT: LAHAR COUNTY

CAPITAL 1994

$

58

MANAGER: STEVE ~ISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

46

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

6

0TH SHARE$

6

LAHAR 321)70

SR19 SB 14,7-15.2;MONROE:EB 2.3-3.61WB 2.35-3.71TL 5.25-5.6
ADDITION or A PASSING LANE.
PROJECT MILEAGE : 4.20
MANAGER: GORDON BROWN(M)

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROtf 1995 CONST

UNDERtfAY
$ 290 AFTER 96

LAHAR 331820

SR 36: NB MP-10.15-11.751 SB 14.20-15.85; NB 17.85-19.35
ADDITION or A PASSING LANE.
PROJECT MILEAGE: 4.75
MANAGER: GORDON BROWN(M)

CONG DIST . 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992
ROtf 1995 CONST

UNDERWAY

$

44

AFTBR 96

,~

,, 0

..

9H

~

~

~ ,.

~

=~ =

= ~

i!,t~

-~

/,;,.,:::Wfi

=~ ..

l'!:..~~

l/!)~l!i~

l~,:;-:/~:....:

[..;,~- :~...:

COUNTY P.l.NO.

01!:SCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COHHENTS

LAURENS 281143

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LAURENS MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

LAURENS COUNTY OPERATED PUBLIC TRANSIT SERVICI!:
2Bllf4 TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LAURENS MANAGER! STEVE KISR

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

LAURENS COUNTY OPl!:RATEO PUBLIC TRANSIT SERVICI!: 2B1145 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: LAURENS MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

LAURENS TWO STANDARD VANS ANO TWO MOBIL!!: RADIOS 2C2143 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: LAURENS MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

LAURENS I-16@ SR31/US 441 IN DUBLIN, RELOC PINERILL ROAD 210500 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .56 - EXIST, LANES: 4 /PROPOSED LANES: 4 MANAGER: RON BRAZIEL

CONG DIST. 8 GRIP PROJECT FUND SOURCE: I-STATE HAINT, FEDERAL HIGHWAY ADMIN FUNDS

LAURENS I-16 ACROSS OCONEE RIVER ANO OVERFLOWS (10 BRIDGES)
210650 BRIDGES/ RECST, OR RERAB. PROJECT MILEAGE: 2.22 MANAGER:

CONG DIST, 8
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS

LAURENS 1-16 AT TURKEY CK, PUGHES CK, MERCER CK
210660 BRIDGES/ RECST, OR REHAB, PROJECT MILEAGE : ,00
MANAGER:

CONG DIST, 8
FUND SOURCE: I-STATE HAINT, FEDERAL HIGHWAY ADMIN FUNDS

...

16-Sep-1993 Page 223

FISCAL YEAR

COST !STS
-------

OPERATING 1994 $

!15

FED SHARE$

32

GA. SHARE$

0TH SHARE$

22

OPERATING 1995 $

6f

FED SHARE$

36

GA. SRARE $

OTR SHARE$

27

OPERATING 1996 $

67-

FED SRARE $

38

GA. SHARE $

0TH SRARE $

29

CAPITAL 1994

$

f2

FED SHARE$

34

GA. SHARE$

4

0TH SHARE$

4

PE 1993 UNDERWAY: ROW 1994 $ 200 CONST 1995 $ 3315
FED SRARE $ 2984 GA. SHARE$ 332 0TH SHARE$

PE 1994 $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

186 0
6195 5576
620

PE 1994 $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$ OTR SHARE$

38
0
1261 1135
126

'

r.F'.nnr.J/1 t>FT/\P.THF:NT (If" TP/\l!~rORT/\TION ST/\TE TRNISPORTATION IMPROVEMENTS PROGRAM tROJECT LISTING BY ,-ouNTY rY 1994/FY 1996

16-Sep-1993 Page 224

COUNTY

DESCRIPTION

FISCAL

COST

-------------------------------------------- P.I.NO.

PROJECT DATA

LAURENS I-16 FROH TWIGGS CL TO US 441 IN LAUREN-S--C-T-Y---. SEE BLECKL-E-Y----------

COMMENTS

YEAR PE NONE

l!!STS

$

0

21067X RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEIU., STRIPE ETC.CONG DIST. 8

ROW NONE $

0

PROJECT MILEAGE : .OO - EXIST. LANES: 4 /PROPOSED LANES: 0

.

CONST 1994 $

0

HANAGl!!Rt UNll:NOWN

FUND SOURCE: I-STATE HAINT.

FED SHARE$

FEDERAL HIGHMAY ADHIN FUNDS

GA. SHARE$

OTB SHARE$

LAURENS 221810

SR 19/DUBLIN FH HULTI-LN@ INDUSTRIIU. BLVD NW TO S-1641 , BR RECONSTRUCTION & WIDENING FROH 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.92 MANAGER: K FULBRIGHT (Cl

CONG DIST. B
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UND!RNAY

RON 1995 $ 145

CONST 1996 $ 2319

FED SHARE $ 1855

GA . SHME $

464

0TH SHARE $

LAURENS 221820

SR 29/US 441 FM NORTRVIEM AVE TO 600' N/TERRACE DRIVE,BRIDGE RECONSTRUCTION, MIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.56 . MANAGER: K FULBRIGHT

CONG DIST. 8 GRIP PROJECT FUND SOURCE: SURFACE TRANSPORT. ,FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERNAY RQW 1992 UNDERWAY CONST 1995 $ 2210
FED SHARE$ 1768 GA. SHARE$ 442 OTA SHARE $

LAURENS 222010

SR 117@ BAY CREEKS/CADWELL
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .10 MANAGER! D. GRIFFITH

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOHIN FUNDS

PE 1993 .UNDERWAY

ROM 1993 UNDERWAY

CONST .1995 $ 201

FED SHARE $

161

GA. SHARE $

40

0TH SHARE $

LAURENS 241841

SR 31 RELOCATION 8 CSX RR/ID 641050X RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: M HESTER

CONG DIST. 8
FUND SOURCE: HMY. SAFETY FEDERAL HIGHWAY AOHIN FUNDS

PE NONE RON NONE CONST

$

' 0

$

0

AFTER 96

LAURENS 81103Z

CALL BOXES ON I-16 FROH SR 87/BIBB TO I-95/CHATHAM . SEE BIBB
UNDIOWN / UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1 , 8
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

0

ROW NONE. $

0

CONST 1996 $

0

FED SHARE$

GA. SHARE $

OTR SRARE $

-

,..

.. ,. ,,

~

~

~
'

~

~ ~

mi~

~:~~

~t'-

!iffi;(i~. ~:s~

-=.,.

~
="

ij,,~1'1

~,;;;';ti

l-- - :... .~-J

-. .. ~ -'~
''

.,.

GEORGIA DEP.MTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 225

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P, t.NO,

PROJECT DATA

COHHENTS

YEAR

ESTS

L-E-E-------S-R---91-/-P-H-I-L-E-H-A---R-D--FH---D-O-U-G-H-E-R-T-Y--C-L--T-O--G-R-A-V-E-S--S-P-R-IN--G--R-D-/-C-R--5---------A-L-B-A-N-Y--T-I-P--I--R-/-R---1-2---------------------P-E--1-9-9-3-----U-N-D-ER-W--AY

.21870 RECONSTRUCTION, WIDENING FROH 2 LANES TO 5 LANES.

CONG DIST, 8

ROW LOCL

PROJECT MILEAGE: 2,81

CONST 1996 $ 3263

MANAGER: H GANNAWAY

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 2610

FEDERAL HIGHWAY ADHIN FUNDS

GA. SRARE $ 653

0TH SHARE$

LEE 45040X

CR 539/DAWSON RD@ SR 520 ... SEE DOUGHERTY CO
UNIUIOWN / UN~NOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: D, CHURCH

ALBANY TIP I R/R-13
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 450400 IS AN ASSOCIATED PROJECT.

PE 1994
ROW LOCL CONST

$

0

AFTER H

COUNTY P,I.NO,

DESCRIPTION PROJECT DATA

r.r.nPr.JA nr.PARTHF.NT OF TRAtlSrORTATION STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COHHP.:NTS

LIBERTY 911140

I-95 FM MCINTOSH co LINE TO SOUTH or JERICO RIVER
RECONSTRUCTION, WIDENING FROM 2 LANES TO 6 LANES,
PROJECT MILEAGE : 13 .15 MANAGER! H. REYNOLDS (H)

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 226

FISCAL

COST

YP.:AR

.. ESTS

P-P-.:--1-9-9-3-.----O-ND-P-.:-R-W-AT

ROW NONP.: $

0

CONST

AFTER 96

LIBERTY 511150

I-95 FM JERICO RVR/LIBERTY TO US 17/BRYAN (, JERICO RVR BR) RECONSTRUCTION, WIDENING FROM 2 .LANES TO 6 LANES. PROJECT MILEAGE : 7.26 MANAGER: M. REYNOLDS (HI

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

LIBERTY 520781

SR 196 FM US84/SR 38 TO SU 17/SR 25 SW OF I-95 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE: 8.85 MANAGER: M. REYNOLDS

CONG DIST, 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY
$ 950 AFTER 96

LIBERTY 521190

SR 196/@ BAUR SWAMP SLOUGH REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 5 LANES. PROJECT MILEAGE : .20 MANAGER: M. REYNOLDS

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1985 ROW 1987 CONST

UNDERWAY UNDERWAY AFTER 96

LIBERTY 522570

US 84 CONNECTOR FH S SR 196/US 84 INT TO US 84 S FLEMINGTON

CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

PROJECT MILEAGE : 3.70 MANAGER! N. PASSMORE (HI

(

CONG DIST, 1
GRIP PROJECT FUND SOURCE: NAT'LHIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1995 ROW
CONST

$ 380 AFTER 96
AFTER 96

LIBERTY SR 38 AT SR 119 522630 INTERSECTION IMPROV!:MENT / TRAFFIC
PROJECT MILEAGE: .50 - EXIST. LANES: 2 /PROPOSED LANES: 5 MANAGER! PETE BLOCKER

LIBERTY 531180

SR 196 FH NW CR 119 TO 4-LANE SEC@ JOYNER OR/CR 198
RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.78 MANAGER: ~ETE BLOCKER..

CONG DIST. 1 GRIP'PROJ1!:CT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHNAY ADHIN FUNDS
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

10

ROW 1994 $

60

CONST 1994 $ 479

FED SHARE$ 479

GA; SHARE $

0TH SHARE$

PP.: 1992 UNDERWAY
ROW 1994 $ 405 CONST 1995 $ 4612
FED SHARE $ 3690
GA. SHARE $ -922 0TH SHARE $ -

,~

.,, .. {

~

~

== ~ ~ es ~ ~~t~~~?.!fi l(;;Jr~J. -..,,,.=.,....., l'f1;;.i~ ~~~

~~

1-:-~:,,..;;e,.,

:,

e:l

tJ:

GEORGIA DEPARTMENT or TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 227

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.1.NO.

PROJECT DATA

COMMENTS

YEAR

!STS

-L-IB-E-R-T-Y----C-R--1-2-1/-L-E-W--I-S--F-R-A-S-E-R--R-D--F-M--C-R--1-7-1--T-O--S-R--3-8----------------------------------------------------------------P-E--N-O-N-E-----$------0

531320 RECONSTRUCTION, WIDENING FROM O LANES TO 2 LANES,

CONG DIST. l

ROW LOCL

PROJECT MILEAGE : 1.57

CONST 1994

$

593

MANAGER: M. REYNOLDS (C)

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

474

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$ 119

0TH SHARE$

LIBERTY 541940

FRAN~ COCHRAN OR EXT FM SR 196@ CS 8823 TO US 84@ SR 196 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 1.20 MANAGER! N. PASSMORE (M)

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW 1995 CONST

ONO!R,rAY $ 3100 AFTER H

LIBERTY 570990

THE LIBERTY TRAIL FM RICEBORO, MIDWAY TO SUNBURY RIST SITE BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE : .oo - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. l
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

20

ROW 1994 $

20

CONST 1994 $

85

FED SHARE$

68

GA. SHARE$

8

0TH SHARE$

25

(_

t~F'."l't~II\ PF'.rllllTHF:IIT ()f" TPJ\tl5r0RTI\TtnN STI\TE TRJ\NSPORTI\TION lHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 228

COUNTY P.t.NO,

DESCRIPTION PROJECT DATA

LINCOLN COUNTY OPERATED PUBLIC TRANSIT SERVICE

FISCAL

COST

COMMENTS

YEAR

1!:STS

---------------------------------

2B1148 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 10

FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH

OPERATING 1994 $

25

FUND SOURCE: RURAL TRANSIT

FED SHARE$

15

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SRARE $

10

LINCOLN 2B1149

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1995 $

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

11

LINCOLN 2B1150

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1996 $

27

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

11

LINCOLN 2C2148

ONE CONVERSION VAN "ITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH

CONG DIST, 10

CAPITAL 1994

$

31

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

LINCOLN 2C2149

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LINCOLN MANAGER! STEVE KISH

CONG DIST, 10

CAPITAL 1995

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

LINCOLN 242220

CR 262/NOODLAWN ROAD@ LLOYD CREEK 7 HI SW OF LINCOLNTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : , 20 MANAGER:

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

8

ROW LOCL

CONST 1996 $ 271

FED SHARE$ 216

GA, SHARE$

54

OTR SHARE$



I

t

I

== = ,. .. ~ ~ .~ ~ ~ ~ ~ if'~!~ ~ ~:'.:'.ife1.:c;, ~;.:t~ l!JJtS!~ ~~ 1:._:....:

. .,. '

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 229

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

L-O-N-O------C-O-U-N-T-Y--O--PE-R-A-T-E-D---P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------

581303 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 1

FUNDS RECIPIENT: LONO COUNTY

OPERATING 1994 $

43

MANAGER: STEVE KISR

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADHIN FUNDS

GA. SRAAE $

OTR SHARE$

18

LONO 581304

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: LONG MANAGER: STEVE KISH

CONG DIST. 1 -

OPERATING 1995 $

39

FUND SOURCE: RURAL TRANSIT

FED SRAAI!! $

23

FEDERAL TRANSIT ADMIN FUNDS

GA. SRARI!! $

OTR SHARI!!$

16

LONG 581305

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LONG MANAGER: STEVE KISH

CONG DIST. 1

OPERATING 1996 $

42

FUND SOURCE: RURAL TRANSIT

FED SHAAE $

25

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARI!! $

0TH SHAAE $

17

LONG 5C2303

ONE CONVERSION VAN WITR LIFT AND ONE STANDARD VAN
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LONG MANAGER: STEVE KISH

LONG 54196X

(
SR 196 OVER BEARD'S CREEK/ SEE TATTNALL CO UNKNOWN/ UNIOIONN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 1 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL fflGH"AY ADMIN FUNDS

CAPITAL 1994

$

54

FED SHARI!!$

43

GA. SHARI!!$

6

0TH SHARI!!$

5

Pl!! 1994 ROW 1996 CONST

$

0

$

0

AFTER 96

COUNTY P.l.NO.
LOWNDES 410398

DESCRIPTION PROJECT DATA
I-75 8 SOUTHERN RR; HUD CMI BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: ff. ASHMORE

CF:fllH~ 111 PF:rl\RTMF:IIT or TRIIIISr0RTJ\Tlotl
STATE TRANSrORTJ\TlON IHPROVEHENTS PROGRJ\H
PROJECT LISTING BY COUNTY FY 1994/FY 1996

COMMENTS

SCL RRt SR 38

CONG DIST. 8

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 230

FISCAL

COST

YEAR

!STS

------------P-E--1-9-9-2-----UNDERWAY

. ROW NONE $

O

CONST 1994 $ 1439

FED SHARE$ 1151

GA. SHARE$ 288

0TH SHARE$

LOWNDES 410500

I-75 FM NORTH or SR 94 TO COOK COUNTY LINE
RECONSTRUCTION' WIDENING FROH 4 LANES TO 6 LANES. PROJECT MILEAGE : 13.30 MANAGER: H. ASHHORE(H)

CONG DIST. 8 , 2
FUND.SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

LOWNDES 421560

SR 7/US 41 FH CR 267@ DASHER N TO COPELAND ROAD RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.
PROJECT MILEAGE I 3.30 MANAGER: K FULBRIGHT

LOWNDES 421590

SR 7/US 41 FM 1400' NW/SR 376 TO S/JOHNSTON RO RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE I 4.00
MANAGER: K FULBRIGHT

LOWNDES 42172X

SR 94 FH CR 276/BROOKS CO TO E/WITHLACOOCHEE RVR/SEE BROOKS
UNKNOWN/ UNIOIOWN PROJECT- MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: K FULBRIGHT

LOWNDES 42172Y

SR 94 8 LITTLE;WITHLACOOCHEE, OFLW/SEE BROOKS CO

UNKNOWN/ UNKNOWN

PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: K FULBRIGHT

'

LOWNDES 422280

SR 125 FH CR 189 TO HOODY AFB NORTH GATE IN VALDOSTA RECONSTRUCTION, WIDENING FROM 4 LANES TO 5 LANES.
PROJECT MILEAGE: 7;38 MANAGER: K FULBRIGHT (M)

CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST .. 2 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 421720 IS .AN ASSOCIATED PROJECT.
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421722 IS .AN ASSOCIATED PROJECT.
CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN.FUNDS

PE 1992 UNDERWAY ROW 1993 UNDERWAY
CONST 1994 $ 4427 FED SRARE $ 3542
GA. SHARE $ 885 0TH SHARE $

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$ 39t7

FED SHARE $ 3158

GA. SHARE $ 789

0TH SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY

$

0

AFTER 96

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

, .. f

41

~

.. ~ . ~{,

~
"

~

=~ ! , I

5ti:1~~

F/~-~e

b:C((.X!.!

1:.c;~~d,

,,J~n~rni

l~iiif.~

l~':'.~!!MI

t~.i.~~J\..::,:,

;,/. --~.;~

.. ,....... ,
!11

f\J'

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

LOWNDES 422360

SR 7/US 41 AT SR 31/US 221 IN VALDOSTA RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .OO MANAGER:

.CONG DIST. 2.
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 231

FISCAL

COST

YEAR

ESTS

P-E---N-O-N-E-----$------O

ROW 1995

$

1

CQNST 1996 $ 116

FED SHARE$

116

GA. SHARE$

OTB SHARE$

LOWNDES 431340

ONE-WAY PAIR ASHLEY, PATTERSON tM N'SIDE OR TO SR 7/US 41 MINOR WIDEN, RESURF / RECST. OR REHAB. PROJECT MILEAGE : .49 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE NONE $

0

ROW 1994 $

1

CONST 1996 $ 200

FED SHARE$ 160

GA. SHARE$

40

0TH SHARE$

LOWNDES 442560

OLD CLYATTVILLE RO/CR 785 FH N/I-75 TON -OF INDUSTRIAL BLVD RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES . PROJECT MILEAGE : 1.80 MANAGER: RAY METTS (H)

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 442565 IS AN ASSOCIATED PROJECT.

PE 1996 ROW LOCL CONST

$

90

AFTER 96

LOffllDES 442565

OLD CLATTVILLE IU>/CR 785 OVER HUD CREEK IN VALDOSTA REPLACEMENT OF THE EXISTING BRIOGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .20 MANAGER: RAY METTS (H)

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 442560 IS AN ASSOCIATED PROJECT.

PE 1996 ROW LOCL CONST

$

10

AFTER 96

LOWNDES 450430

SR 7/US 41 AT JAMES BECK OVERPASS IN VALDOSTA INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE: .20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: J. LINDSEY

CONG DIST. 2
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1994 $

6

CONST 1995 $

50

FED SHARE$

45

GA. SHARE$

5

0TH SHARE$

LOWNDES 450440

GORDON STREET/CR 555/CR 720 FM 8AYTREE RD TON FORREST ST RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.87 MANAGER: RAY METTS (H)

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

96

AFTER 96

LOWNDES 450450

N OM STREET FH BAYTREE ROAD TO GEORGIA AVE. TURN LANES/ TRAFFIC PROJECT MILEAGE : .32 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: J. LINDSEY
I

CONG DIST. 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1995 $ 150

FED SHARE$ 135

GA. SHARE$

15

0TH SHARE$

r.F:nPr.JI\ OF:rl\RTMF:IIT OF' TP/\U~rORTI\TION

STATF: TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY
,.r.No.

DESCRIPTION PROJECT DATA

COHMZNTS

L-O-W--N-D-ES---S-T-R--!E-T-S-C-A-P-E-S--D-O-W--N-TO-W-N---V-A-L-D-O-S-T-A-, --P-E-D-/-B-t-iE---P-A-T-R-S--L-ANDSCAPING

471010 MISCELLANEOUS IMPROVEMENTS/ ENRANCEMENT

CONG DIST, 2

PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER!

FUND SOURCE: TRANS, ENHANCE,

FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 232

FISCAL YEAR

COST HTS

PE LOCL
ROW LOCL CONST 1994 $
FED SHARE$ GA, SHARI!! $ 0TH SHARE$

1250 1000
250

'

'* ll

~-a

-~

~

~


~,.

etr:5

~:<n:i

~~.fffr;t

~~~fffl

MJ;~

~~~:~~

flet!fel

~I.Kf!l,

~

f~tp"':.:~;



,,,

GEORGIA DEPAATHENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 / Page 233

COUNTY

DESCRIPTION

FISCAL. COST

P,I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

LU-M--P-K-IN---C-O-U-N-T-Y--O-P-E-R-A-T-E-D--P-U-B-L-I-C--T-R-A-N--SI-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------

1B1033 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 9

FUNDS RECIPIENT: LUMPKIN MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

"OPERATING 1994 $

29

FED SHARE$

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

11

LUMPKIN 1Bl03.

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LUMPKIN MANAGER: STEVE KISH

CONG DIST, 9

OPERATING 1995 $

31

FUND SOURCE: RURAL TRANSIT

FED SHARE$

19

FEDERAL TRANSIT ADMIN FUNDS

GA, SHARE$

0TH SHARE$

12

LUMPKIN 1Bl035

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LUMPKIN MANAGER: STEVE KISR

LUMPKIN 1C2034

ONE CONVERSION VAN WITR LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LUMPKIN MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1996 $

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

20

FEDERAL TRANSIT ADHIN FUNDS

GA, SHARE$

0TH SHARE$

13

C.

CONG DIST. 9

CAPITAL 1995

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

LUMPKIN 122370

SR 52 WB BETNN CR 190, CR 253 (HP 15.B TO 17.4)
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.60 MANAGER: L. OWENS

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

20

AFTER 96

LUMPKIN 132140

OJUILONEGA SOUTH BYP/CR 257 FM SR 9 TO SR 60 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : .90 MANAGER: L. OWENS

LUMPKIN 132290

CR 188/LONG BRANCH RD FM ENO SR 400 TO SR 52 RECONSTRUCTION & WIDENING, NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 4.72 MANAGER: K FULBRIGHT (H)

CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW 1994

$

CONST 1994 $

FED SHARE$

GA. SHARE$

0TH SHARE$

0
450
1556 1245
311

PE 1996 ROW CONST

$

40

AFTER 96

AFTER 96

~~nn~JA ~~tARTM~NT OF TRANSPOPTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRJ\H PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 234

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO,

PROJECT DATA

L-U-M--P-K-IN---C-R---81-/-C-L-A-Y---C-REEK FAL-L-S---R-O-@ CLAY CREEK - -----

-

COHHENTS

YEAR

ESTS

-------------------------------------------------------------------

PE 1993 UNDERWAY

170762 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,

CONG DIST, 9

ROW LOCL

PROJECT MILEAGE I ,30

-

CONST 1994 $ 235

MANAGER: L. OWENS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 188

FEDERAL RIGH"AY ADHI_N FUNDS

GA, SHARE$

47

0TH ,SHARE$

LUMPKIN BRIDGE REPLACEMENT OVER ETOWAH CREEK BY FOREST HWY
170910 BRIDGES/ REPLACEMENT PROJECT MILEAGE : .00 H.ANAGERt L, OWENS

CONG DIST. 9
FUND SOURCE: FED, LANDS FEDERAL HIGHNAY ADHIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1994 $ 462

FED SHARE$ 462

GA, SHARE$

0TH SHARE$

r.

-



..

~

~

.. ~ ~ ~ i:~~f;~~ . f:t:t~ J,Sr,1t~t:a ~~'$ i%it~ ~:C!S:.t~ tf.9!~ ~ tf.:-5;::;~ !':' .~~ "

- ,.

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATIO'' IMPROVEMENTS PROGRAM

16-Sep-1993 Page 235

PROJECT LISTING BY tOUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

M--A-CO-N-----S-R---26---PA--S-S-IN-G---L-A-N-E-S-@---4--L-O-C--/S-C-H--L-E-Y-,--M-A-C-O-N--c-o-.-.-.-S-E-E--S-C-H-L-E-Y-----------------------------------------------P-E--N-O-N-E-----$------0

32198X UNKNOWN/ 'UNKNOWN

CONG DIST. 2

ROW 1994 $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

GRIP PROJECT

CONST 1995 $

0

MANAGER: GORDON BROWN

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$

321987 IS AN ASSOCIATED PROJECT,

0TH SHARE$

MACON 322280

SR 90@ SCL RR/SANO CRK IN IDEAL;@ SCL RR S/JCT. SR 195
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDEO LANES.
PROJECT MILEAGE I .25 MANAGER: GORDON BROWN

MACON 322290

SR 49/128@ HILLS CREEK E or JCT W/SR 49, 26
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BRONN

CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY ROW 1994 $ 170 CONST 1995 $ 1933
FED SHARE$ 1546
GA. SHARE$ 387
0TH SHARE$

PE 1992 UNDERWAY

ROW 1994 $

15

CONST 1994 $ 251

FED SHARE$ 201

GA, SHARE$

50

0TH SHARE$

MACON 370950

ANDERSONVILLE NATL PRISONER or WAR MUSEUM ENTRANCE RD/PARP:IN CONSTRUCTION or NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT HILEAGB : 1.10
MANAGER:

CONG DIST. 2
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS

PE LOCL
ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0 2390 1912
478

MACON 37121X

CR 25 OVER HOGCRAWL CREEK 9 HI WOP' UNADILLA: SEE DOOLY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA, SHARE$

0TH SHARE$

,:~on~,n o~rnPTH~HT OF TRnttsroRTftTION STftTF. TRJ\NSPORTftTION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 236

M-PC-AO-,D!U-I,SN-NOT-ONY--, --S-R--8--FM---C-R--2-2-8-DP-l@El-OS-DJC-EIRA-CIM-TP-OT-NIDO-DA-NT-AH-I-L-L--T-O--C-R--3-9-2-/-D-A--N-I-E-L-S-V-I-L-L-E-/-,--C-L-V-'l'-------------C-O-M-M-E-N-T-S--------------------------FP-EIY-SE-CA1-AR9-L9-2-~. ~-U-NCE-OOS-TES-TRS-ff-AT

122180 RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.

CONQ DIST, 10

ROff

AFTER 96

PROJECT MILEAGE : 5 ,10

CONST

AFTER 96

MANAGER! H. ASHMORE(M)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

122190 IS AN ASSOCIATED PROJECT.

MADISON 122185

SR 8/US 29@ BRUSH CRR, S, FORR BROAD RIVER RERA9, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : ,50 MANAGER: H. ASHHORE(H)

CONG Dl:ST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

Pl!! 1996
ROW NONI!! CONST

$

20

$

0

AFTER 96

MADISON 122190

SR 8/US 29 FH SR 106 TO CR 228@ DIAMOND RILL/INCL CLVT RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.90 MANAGER: H. ASHHORE(H)

MADISON 170786

CR 37@ MASONS HILL CREER 5 HI NE OF DANIELSVILLE
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .20
MANAGER:

CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 122180 IS AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: BRIDGE ~ROGRAH FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

Pl!! 1994 $ ROW LOCL CONST 1996 $
FED SR.ME$
GA. SHARE$
0TH SHARE$

1
230 , 1841
416

_t . \

~.

.e:~ = 6Ei!B ~ ,~ , ,.

~~ ~xt:11 ~~~!'$~ r~,.~ ,.,..._ ,,a- ~ f~ i>'"'""""' li!O:$:~ ie:e:e:s~ ~~~ r:~: ..--~

......~;

GEORGIA DEPARTMENT or TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 237

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL . COST

P, I.NO, ,

PROJECT DATA

COMMENTS

YEAR

ESTS

M--A-R-IO--N----S-R -26--W--8--H-P--1-4-.-2--1--2-.7-:-E-B---1-1-.-2--1-2-.-6-:-W--B--3-.-1---4-,6--:E--B--4-.-7---6-,-3-5------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

321982 M>OITION or A PASSING LANE.

CONG DIST. 2

ROW 1993 UNDERWAY

PROJECT MILEAGE: 6.05

GRIP PROJECT

CONST 1995 $ 1933

MANAGER: GORDON BROWN

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 1546

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$ 387

0TH SHARE$

MARION 331610

SR 355@ PINE lrnOT CREEK N OF JCT W/ SR137
REPLACEMENT OF THE EXISTING BRIOGES(S), NO ADDED LANES.
PROJECT MILEAGE 1 ,90 MANAGER! GORDON BROWN

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMlN FUNDS

PE 1993 UNDERWAY

ROW 1995 $

28

CONST 1996 $ 811

FED SHARE$ U9

GA, SHARE$ 162

0TH SHARE$

MARION 342895

CR 128/00YLE ROAD@ OOCHEE CREEK 2.3 Ml Nor SR 26 REPLACEMENT or THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .21 MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

10

ROW LOCL

CONST 1996 $ 363

FED SHARE$ 290

GA. SHARE$

73

0TH SHARE$

r.

COUNTY P,I.NO,

DESCRIPTION PROJECT DATA

r.F:QRG I II PF:r IIRTMF:IIT Of TJlANSf'ORTIIT rm1 STIITF. TRNISrORTIITION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

MCDUFFIE COUNTY OPERATED PUBLIC TRANSIT SERVICE 281153 TRANSIT FACILITIES / OPERATIONS
FUNDS RECIPIENT: MCDUFFIE
MANAGER: STEVE KISH

CONG DIST, 10
FUND SOURCE: RURAL TRANSIT FEDER.AL TRANSIT ADHIN FUNDS

MCDUFFIE COUNTY OPERATED PUBLIC TRANSIT SERVICE 281154 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MCDUFFIE MANAGER! STEVE KISH

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

MCDUFFIE COUNTY OPERATED PUBLIC TRANSIT SERVICE 281155 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MCDUFFIE .MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

-16-Sep-1993 Page 238

FISCAL YEAR

COST ESTS
-

OPERATING 1994 $

68

FED SHARE$

J!I

GA, SHARE$

0TH SHARE$

28

OPERATING 1995 $

70

FED SHARE$

40

GA. SHARE$

0TH SR.ARE$

JO

OPERATING 1996 $

"73

FED SHARE$

42

GA, SHARE$

0TH SHARE$

Jl

MCDUFFIE ONE STANDARD VAN AND ONE MOBILE RADIO 2C2153 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: MCDUFFIE
MANAGER: STEVE KISH

CONG DIST. 10

FUND SOURCE: RURAL TRANSIT

CAPITAL 1994

$

21

FED SHARE$

17

FEDERAL TRANSIT ADHIN FUNDS

GA, SHARE$

2

0TH SHARE$

2

MCDUFFIE ONE CONVERSION VAN WITH LIFT AND ONE HOBILE RADIO
2C2154 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: MCDUFFIE MANAGER! ST_EVE KISH .

CONG DIST. 10

CAPITAL 1995

$

JJ

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADHIN FUNDS

GA, SHARE$

4

0TH SHARE$

3

MCDUFFIE SR 17@ BIG BRIER CREEK 221210 REPLACEMENT OF THE EXISTING BRIDCES(S). NO ADDED LANES.
PROJECT MILEAGE: .26 MANAGER: D, GRIFFITH

CONG DIST. 10 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 222590 IS AN ASSOCIATED PROJECT.

PE 1986 UNDERWAY ROW 1987 UNDERWAY CONST 1994 $ 660
FED SHARE$ 528
GA,. SHARE $ 132 0TH SR.ARE$

MCDUFFIE SR 10@ SR 150 NORTH OF THOMSON/ INCL SIGNALS 222240 TURN LANES/ TRAFFIC
PROJECT MILEAGE : ,32 - EXIST, LANES: 2 /PROPOSED LANES: 3 MANAGER: .D. GRIFFITH

CONG DIST, 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS

PE NONE $

0

ROW 1994" $

10

CONST 1994 $ 267

FED SHARE$ 240

GA. SHARE$

27

0TH SHARE$

..

~

~

~~ ~

6er~

= ~

~~

h:~
1"1'-"""1"'"'

10.~~~l

r~

~ff~ . ~~

ft,~~1i'.'I:e

:~::: '

..

GEORGIA DEPARTMENT or TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 239

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCIUPTION

FISCAL

COST

P,l,NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

M--C-D-U-F-F-IE---CR---3-0-8--N-"--o-r--T-H-O-M-S-O-N-@---M-I-D-D-L-E--C-R-E-E-K----------------------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY

231180 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDEO LANES.

CONG DIST. 10

ROW LOCL

PROJECT MILEAGE : .11

.

CONST 1995 $ 347

MANAGER: O. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 278

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$

69

231182 IS AN ASSOCIATED PROJECT,

OTR SHARE$

MCDUFFIE CR 308 NORTR OF THOMSON@ MATTOX CREEK 231182 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES,
PROJECT MILEAGE : ,10 MANAGER: D, GRIFFITH

CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 231180 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWA?

ROW LOCL

CONST 1995 $ 211

FED SHARE$ 169

GA. SRA.RE$

42

0TH SHARE$

MCDUFFIE ORIG. TOWN OF tfRIGHTSBORO HISTORIC SITE AND TRAIL 270970 SIGNING/ ENHANCEMENT
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS

PE LOCL

ROW NONE $

0

CONST 1996 $

31

FED SHARE$

25

GA. -SHARE $

0TH SHARE$

6

GF.0RGII\ (lEPAPTHENT OF' Tll.MISPORTI\TIOtl STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY couNTY FY 1994/FY 1996

16-Sep-1993 Page 240

COUNTY P.I.NO.

DESCRIPTION Pll.OJECT DATA

MCINTOSH I-95 FM ALTI\HAHA RVR/GLYNN CO TO l HIN/SR 251

COMMENTS

FISCAL

COST

----- YEAR

ESTS

-----------------P-E---1-9-9-3--- ONDERWAf

511110 RECONSTRUCTION, WIDENING FROH 2 LANES TO 6 LANES,

CONG DIST, 1

ROW NONE $

O

PROJECT MILEAGE: 5,26

CONST

AFTER 96

MANAGER: H. REYNOLDS (H)

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADHIN FUNDS

MCINTOSH I-95 nt 1 HIN/SR 251 TO SR 57 511120 - RECONSTRUCTION, WIDENING FROM 2 LANES TO 6 LANES,
PROJECT MILEAGE : 8.40 MANAGER: H. REYNOLDS (M)

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDER.AL HIGHWAY ADMIN FUNDS

PE 1993 ROW NONE __ CONST

UNDERWAY

$

0

AFTER 96

MCINTOSH I-95 nt SR 57 TO LIBERTY CO LINE 511130 RECONSTRUCTION, WIDENING FROM 2 LANES TO 6 LANES.
PROJECT MILEAGE : 8.26 MANAGER: H. R.EYNOLOS (H)
r.
MCINTOSH SR 25/US 17@ BUTLER RIVER 1 Ht SOUTH or DARIEN 522240 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES,
PROJECT MILEAGE : .80 MANAGER: PETE BLOCKER

CONG DIST. 1 FUND SOURCE: NAT'L HIGHWAY FEDER.AL HIGHWAY ADHIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDER.AL HIGHWAY ADMIN FUNDS

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

PE 1993
ROW 1995 CONST

UNDERWAY

$

5

AFTER 96

MCINTOSH CR 59 E or JCT W/SR 99@ UNNAMED STREAM" 570750 REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDEO LANES.
PROJECT MILEAGE: .20 MANAGER: PETE BLOCKER

MCINTOSH CITY or DARIEN HISTORIC DISTRICT/LANDSCAPE

571020

BICYCLE/PED, FACILITY/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

CONG DIST, 1 FUND SOURCE: BRIDGE PROGRAM FEDER.AL HIGHWAY ADMIN FUNDS
CONG DIST. l FUND SOURCE: TRANS, ENHANCE. FEDER.AL HIGHWAY ADMIN FUNDS

PE 1994 $

10

ROW LOCL

CONST 1996 $ 230

FED SHARE$ 184

GA. SHARE$

46

0TH SHARE$

PE LOCL

ROW NONE $

0

CONST 1994 $ 250

FED SHARE$ 200

GA. SHARE$

0TH SHARE$

50



..

11!e

~

~-

. ~ "

~

~~

~

~ t,R:c.;,SQ.;:I

~

~

~

~..,..,
i=a-"-"'!'1

~

1,:.:.a,

j: ,.::,:

....... .,.

GEORGIA DEPARTMENT or TRJ\NSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 241

COUNTY

DESCRIPTION

FISCAL

COST

P,I,NO.

PROJECT DATA

COMMENTS

YEAR

!STS

--------------------------------------------------------------,--------------------------------------------------------------------

H!RIWETH SR 41 FH SR 85E TO c,G / SEE TALBOT COUNTY

PE NONE $

0

32089Z ADDITION OF A PASSING LANE.

CONG DIST. 2

ROW NONE $

0

PROJECT MILEAGE : ,00

CONST 1994 $

0

MANAGER: GORDON BROWN

FUND SOURCE:SURFACE TRANSPORT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

320892 IS AN ASSOCIATED PROJECT,

0TH SHARE$

H!RIWETH REPLACE SCL RR BR OVER SR 41 W OF WARM SPRINGS/INCL DETOUR
321880 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .25 MANAGER: J. GRAYBEAL(H)

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

H!RIWETH SR 100@ OLLIE BRANCH S OF SR 54 331S30 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .38 MANAGER: GORDON BROWN
H!RIWETR CR 423 N OF JCT W/SR 362@ JARRELL CRK
370870 REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BROWN

CONG DIST, 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 UNDERWAY

ROW 1995 $

10

CONST 1996

$

335:

FED SHARE $ 268

GA. SHARE $

S7

0TH SHARE $

PE 1992 UNDERWAY.

ROW LOCL

CONST 1994 $ 320

FED SHARE$ 256

GA. SHARE $

64-

0TH SHARE$

r.F.0P1~ I fl 1F.rl\RTMF:.,T OF TllAfl.SPORTJ\TlOII STJ\TE TRJ\NSrORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 242

PROJECT L1ST1NG BY COUNTY FY 1994/FY 1996

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

COHHENTS

FISCAL YEAR

COST ESTS

M--IL-L-E-R----S-R---1/-U-S--2--7-@--S-P-R-I-N-G---C-R-E-E-~--------------------------------------------------------------------------------P-E--1-9-9-0

421715 RHAII. OF TH! EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.

CONG DIST. 2

ROW NONE

.----------

UNOP.:R"AY

$

0

PROJ!:CT MILEAGE : .50

GRIP PROJECT

CONST 1994 $ 110

MANAGER: M GANNAWAY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 935

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE $ 234

421710 IS AN ASSOCIATED PROJECT.

0TH SHARE $

HILLER 431190

SR 310 FH DECATUR CO LINE TO SR 1/COLOUJTT RECONSTRUCTION, WIDENING. NO LAN! ADDITION PROPOSED.
PROJECT HILEAG! : 7,42 MANAGER: J. LINDSEY

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992
ROW CONST

UNDERWAY AFTER 96 AFTER 96

MILLER 470861

CR 183/UNION CH RD@ AYCOC~S CR~ !COUNTY TO DO APPR NOR~)
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1991 UNO!R"AY

ROW LOCL

CONST 1996 $

54

FED SHARE$

43

GA. SHARE$

2

0TH SHARE$

13

..

,.

ff.

~

~

f!e

~ ..

~ . ..1:

~~

~l ~

1\1.':f)~

~.%'.-If,

~~!W

~~

=~ ~

~!!~~

~;&:~

1:~:-: ..~-

..

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-:1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 243

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL COST

P,I.NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

M--IT-C-H-E-L-L--C-R--2-5-0---9--B-IG---SL-O-U-G--H--W-E-S-T--O-F--C-A-M-I-L-L-A----------------------------------------------------------------------P-E--1-9-9-2-----O-N-D-E-R-W-At

470880 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES.

CONG DIST. 2

ROW LOCL

PROJECT MILEAGE : 1,00

CONST 1994 $ 340

MANAGER: J, LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 272

FEDERAL HIGHWAY AOHIN FUNDS

GA, SHARE$

68

0TH SHARE$

MITCHELL RESTORE MITCHELL DRUG STORE/VISITOR CENTER IN CAMILLA 471020 MISCELLANEOUS IHPROVEHENTS / ENHANCEMENT
PROJECT MILEAGE: ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 2
FUND SOURCE: TRANS, ENHANCE, FEDERAL HIGHWAY AOHIN FUNDS

PE 1996 ROW 1996
CONST

$

20

$

45

AFTER 96

r.rnrr~ J II r,rrlll1TMF'.IIT ()f' TPJ\tlSP011TIIT ION STATE TRANSPORTATION IMrROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 244

COUNTY P.I.NO.
MONROE

I-465

FM

I-75

TDPOREOSSCJERRCITP1T9DI/OUANSTA41/-B-I-B-B----------------------------------------C-O-M-M-E-N-T-S--------------------------PF-EIY-SE-CA1-AR9-9L-3- ---

COST ESTS
UNDERWAY

31159X UNKNOWN/ UNKNOWN

CONG DIST. 8

ROW NONE $

O

'PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

O

MANAGER!

FUND SOURCE: I-STATE HAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FONDS

GA. SHARE$

0TH SHARE$

MONROE 31UlX

I-75 UPGRADE REST AREAS 122/ MONROE SEE DOOLY COUNTY UNIOIOWN / UNKNOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

0

ROW NONE $

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

MONROE I-475 RAMPS AT SR 19

,,.

31lUO RAMP/ RECST, OR REHAB,

CONG DIST, 3

PROJECT MILEAGE I .00 - EXIST. LANES: 2 /PROPOSED LANES: 4

PE 1994

$

18

ROW 1995 $

10

CONST 1996

$

600

MANAGER!

FUND SOURCE: I-STATE HAINT.

FED SHARE$ 540

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

60

0TH SHARE$

MONROlr. 311740

SR 408/I-475 NBL @ I-751 ADD ONE LANlr. , REPL BRIDGE DECK
BRIDGlr.S / RECST. OR REHAB. PROJ!:CT MILEAGE : .25 HANAGlr.R:

MONROE 32137X

r
SR 18 BTNN BARNESVILLE, FORSYTH/PASSING, TL, .. SEE LAHAR CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 3 FUND SOURCE: I-STATE HAiNT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 321370 IS .AN ASSOCIATED PROJECT.

PE 1994

$

12

ROW 1995 $

20

CONST 1996 $ 430

FED SHARE$ 387

GA. SHARE$

43

0TH SHARE$

PE 1992 ROW
CONST

UNDERWAY AFTER 96 AFTER 96

MONROE 322360

SR 83 FM S/CR 125/HUBBARD DR NE TO SR 18/US 41 RECONSTRUCTION, WIDENING FROM 2 LANES TO 3 LANES. PROJECT MILEAGE : 1.00 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW CONST

UNDl!:RWAY AFTl!:R 96 AFTl!:R 96

MONROE 332100

SR 87 FROM BIBB CO LINE TO BUTTS CO LINE SHOULDER WORK/ MAINTENANCE PROJECT MILEAGE : 19.00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

304

FED SHARE$ 243

GA. SHARE$

61

0TH SHARE$

,.

..

~

~

. 5.1!!:?1' -~~

~~~

~

~K~

~~

ffl~,fj

~

~

I~)~

f,i:it:.il:/

f~: .. .----~:.:

.. : - :....

.. ..

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 245

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

M--O-N-RO-E----C-R---1-9-3-@---RU-M---C-R-E-E-K---------------------------------------------------------------------------------------P-E--1-9-9-1-----U-N-D-E-R-"-AY

370810 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 3

RO" LOCL

PROJECT MILEAGE: .30

CONST 1996 $ 404

MANAGER: GORDON BROWN

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 323

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

81

0TH SHARE$

MONROE 370811

CR 163/NESTBROOKS RD OVER TOWALIGA RIVER REPLACEMENT OF THE EXiSTING BRIDGES(S). NO ADDED LANES, PROJECT MILEAGE : .50 MANAGER: ooRDON BROWN

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 UNDER"AY

ROW LOCL

CONST 1995 $ 374

FED SHARE$ 299

GA. SHARE$

75

0TH SHARE$

MONROE 370812

CR 152/ENGLISH ROAD OVER RED CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .50 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE:-BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDER"AY:

RON LOCL

CONST 1995 $ 200

FED SHARE$ 160'

GA. SHARE$

40

0TH SHARE$

(

COUNTY P,J .NO,

DESCRIPTION PROJECT DATA

r;F:OPG!A DF:PI\PTMENT OF TRJ\tlSPORTJ\TJON STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTiNG BY COUNTY FY 1994/FY 1996
COMMENTS

HONTGOH! COUNTY OPERATED PUBLIC TRANSIT SERVICE
581308 TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: MONTGOMERY COUNTY MANAGER: STEVE RISH

CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

HONTGOH! COUNTY OPERATED PUBLIC TRANSIT SERVICE 581309 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MONTGOMERY
HANAG!R: STEVE RISH

CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

HONTGOH! COUNTY OPERATED PUBLIC TRANSIT SERVICE 581310 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MONTGOMERY
MANAGER: STEVE RISH

CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

16-Sep-1993 Page 246

FISCAL YEAR

COST !STS

OPERATING 1994 $

37

FED SHARE$

22

GA. SHARE$

0TH SHARE$

15

OPERATING 1995 $

36

FED SHARE$

22

GA. SHARE $ _

0TH SHARE$

14

OPERATING 1996 $

38

FED SHARE$

23

GA. SHARE$

0TH SHARE$

15

HONTGOH! ONE CONVERSION VAN WITH LIFT
5C2308 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: MONTGOMERY
MANAGER: STEVE RISR

CONG DIST. 1

CAPITAL 1994

$

31

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

HONTGOH! 522250

RSREPL1A3C5EMATENTOCoONr EETHECREEEXRISTING

BRIDGES(S).

NO

ADDED

LANES.

PROJECT MILEAGE: .70

MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 522252 IS 1\N. ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1994 $

44

CONST 1994 $ 572

FED SHARE $ 458

GA. SHARE $ 114

0TH SHARE $

MONTGOHE SR 135 AT BUCKHORN CREER NORTH or UVALDA
"522252 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : -.25 MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 522250 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

RON NONE $

0

CONST 1994 $ 337

FED SHARE $ 270

GA. SHARE $

67

0TH SHARE $

HONTGOHE SR 15 BTWN HIGGSTON, TARRYTOWN: NB HP 5.0-6.4:SB e.7-9.7
522520 ADDITION or A PASSING LANE.
PROJECT MILEAGE : 2.40 MANAGER: PETE BLOCKER

CONG.DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1996 ROW CONST

$

27

AFTER 96

AFTER 96

... ..

~

~

!Ht.

~; ~

~ji;t1

~~

~

!1%#i!il

~if~

~

~i

~ii

ru:::z:&-i

;:::-:.

.,.

GEORGIA OEPMTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 247

COUNTY

DESCRIPTION

FISCAL

COST

P, I .NO.

PROJECT DATA

COMMENTS

YEM

ESTS

HORGAN --C-O-U-N-T-Y--O--PE-R-A-T-E-D---P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------

281158 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 10

FUNDS RECIPIENT: MORGAN

OPERATING 1994 $

51

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOHIN FUNDS

FED SHARE$

29

GA. SHARE $

0TH SHARE$

22

HORGAN 2B1159

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HORGAN MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE:: RURAL TRANSIT FEDl!:RAL TRANSIT AOHIN FUNDS

OPERATING 1995 $

53

FED SHARE$

30

GA. SHARE $

0TH SHARE$

23

HORGAN 2B1160

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1996 $

57;

FUND SOURCE: RURAL TRANSIT

FED SHARE$

32

Fl!:DERAL TRANSIT AOMIN FUNDS

GA, SHARE: $

0TH SHARE$

25

HORGAN 2C2158

ONE CONVERSION VAN WITH LIFT ANO ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$

3.

0TH SHARE$

3:

HORGAN 2C2159

ONE STANDARD VAN ANO ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1995

$ u

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17-

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

HORGAN 2C2160

ONE STANOMD VAN ANO ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH

HORGAN 210560

1-20,REST AREA 152,53: REST AREA 162, 63 IN COLUMBIA CO, REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : 2,00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: RON BRAZIEL (C)

CONG DIST. 10 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOHIN FUNDS
CONG DIST, 9 , 10 FUND SOURCE: I-STATE HAINT, F~DERAL HIGHWAY.AOMIN FUNDS

CAPITAL 1996

$

21

FED SHARE $

17

GA. SHARE$

2

0TH SHARE$

2

PE: 1993 UNDERWAY

ROW 1994 $

20

CONST 1995 $ 2252

FED SHARE $ 2252

GA. SHARE $

0TH SHARE $

~F.rip~JA ~F.PARTMF.ttT OF TRANSPORTATION STATF. TRANSPORTATION lMPROVEMF.NTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 248

H-OCP-RO-,IOU-.AN-NNT-OY--, -B-R--ID-G-E--P-A--IN-T-I-N-GD-PR-E-OPSR-CJE-ORC-JIET-PC-T-TIDO-AN-TFO-A-R--FY---1-9-9-4-----D-I-S-T-R-I-C-T--2------------------------C-O-M-M-E-N-T-S--------------------------PF-EIYS-EC-AN-ARO-LN-E-----$-EC-SO-TS-ST--0

21000 BRIDGE PAINTING / MAINTENANCE

CO~G D_IST, 99

ROlf NONE $

0

PROJECT MILEAGE: ,00 - EXIST, LANESr O /PROPOSED LANES: 0

CONST 1994 $ 667

MANAGER r UNKNOWN

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 600

FE~ERAL HIGHWAY ADHIN FUNDS

GA, SHARE$

67

0TH SHARE$

MOROAN SR 83@ HARD LABOR CR~ NW/MADISON 222030 - REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES,
PROJECT MILEAGE : ,38 MANA~ER: D, GRIFFITH

CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FED~IUU. HIGHWAY ADHIN FUNDS

PE 1993 UNDERWAY

ROW.NONE $

0

CONST 1995 $ 1075

FED SHARE.$ 860

GA. SHARE$ 215

OTR SHARE$

MOROAN 270583

CR 38/DOSTER RD@ HARD LABOR CREE~ REPLACEMENT OF THE EXISTINO BRIDGES(S), NO ADDED LANES.
PROJECT MILEAGE : ,51 MANAGER: D, GRIFFITH

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1988 UNDERWAY

ROW LOCL

CONS_T 1994, $ 416

FED SHARE$ 333

GA. SHARE$

83

0TH SHARE$



J,

(_
.. ..

!![@I

~

. ..~

r~
~

~

~ ~~

~t~

Ir('(~

~~~

lf';jjl,;~

--'1.~IJ

P,tim~i (f~::.~~-:ri~~

/;,.,



GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 249

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO,

PROJECT DATA

COMMENTS

YEAR

!STS

HU-R-R-A-Y----C-O-U-N-T-Y--O--PE-R-A-T-E-D---P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------

681368 TRANSIT FACILITIES /,OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: HURRAY MANAGER: STEVE- KISH

OPERATING 1994 $

66

FUND SOURCE: RURAL TRANSIT

FED SHARE$

39

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

27

HURRAY 681369

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HURRAY MANAGER: STEVE KISH

CONG DIST, 9

OPERATING 1995 $

70

FUND SOURCE: RURAL TRANSIT

FED SHARE$

41

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

29

HURRAY 681370

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HURRAY MANAGER: STEVE KISH

CONG DIST. 9

FUND SOURCE: RURAL TRANSIT

OPERATING 1996 $

73

FED SHARE$

u

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

30

HURRAY 6C2368

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HURRAY MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1994

$

28

FUND SOURCE: RURAL TRANSIT

FED SRA.RE$

22

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

HURRAY 620399

SR 52 @ UN RR REHABILITATION OF THE EXISTING BRIOGE(S). NO ADDEO LANES. PROJECT MILEAGE : .. 1 7
MANAGER: BILL MCVEY

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1980 ROW 1995 CONST

UNDERWAY $ 114 AFTER 96

HURRAY 621260

SR 282 RELOCATION FM SR 61/US 411 E TO CR 309 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE: .67 . MANAGER: BILL MCVEY

HURRAY 621265

SR 282/US 76 WB FM HP 5.6 TO HP 6.75 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.15 MANAGER: BILL MCVEY

CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST, .9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY

ROW 1995 $

51

CONST 1995 $ 2829

FED SHARE $ 2263

GA, SHARE $ 566

0TH SHARE $

PE 1992

UNDERWAY

ROW 1994

$

35

CONST 1995 $ 1013

FED SHARE $ 810

GA. SHARE $ 203

0TH SHARE $

r.r.rnH; I II r,rr I\RTHF:IIT or Tlll\t1SrORTIIT lPtl STIITE TRJINSPORTIITION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 250

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO,

PROJECT DATA

COHHENTS

YEAR

. ESTS

H-U-R-R-A-Y----S-R--2-2-5--P-A--S-S-IN-G--L-A-N--E-S--@--4--L-O-C-A-T-I-O-N-S-/G-O--R-D-O-N---H-U-R-R-A-Y--,,-S-E-E-. -G-O-R-D-O-N---------------------------------------------P-B--1-9-9-2--- O-N-D--!R-W--AI

UUlX UNltNOWN / UNltNOWN

CONG DIST, .9

ROW

AFTER H

PROJECT MILEAGE: ,00 - EXIST. I.ANESI O /PROPOSED LANES1 0

.

.

CONST

AFTER gg

MANAGER I UNKNOWN .,

FUND SOURCE: SURFACE TRANSPORT,

FEDERAL HIGHWAY ADMIN FUNDS

621630 IS AN ASSOCIATED PROJECT.

HURRAY 121731

SR 2/SR 61@ SUMAC CREEK REHAB, OF THE EXISTING BRIOGE(S), FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : ,00 MANAGER! J, GRAYBEAL

CONG DIST, 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1995 ROif CONST

$

24

AFTER 9S

AFTER.H

HURRAY 141970

SITTON ROAD AT SR 52 ALT, IN CHATSWORTH TURN LANES/ TRAFFIC PROJECT MILEAGE I ,00 - EXIST, LANES! 0 /PROPOSED LANES: 0 MANAGER!
l

HURRAY 670701

CR 23/LOUGffRIDGE RD@ HILL CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES.
PROJECT MILEAGE I ,15 MANAGER: BILL MCVEY

HURRAY 670780

CR 299 OVER EMERY/HOLLY CREEK BRIDGES/ REPLACEMENT PROJECT MILEAGE: .16 MANAGER: BILL MCVEY

CONO DIST, 9
FUND SOURCE: RWY. SAFETY
FEDERAL ffIGfflfAY ADMIN FUNDS
CONG.DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 9 FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1995 CONST

$

10

$

10

AFTER H

PE 1993 ONOERlfAY

ROW LOCL

CONST 1994

$

228

FED SHARE $ 182

GA. SHARE$

46

OTR SHARE$

PE 1994 $

5

ROW LOCL

CONST 1994 $ 463

FED SHARE$ 463

GA, SHARE$

OTR SHARE$

. "

~

~

.E.,~" ~

~fstJ

=....
~

m~~

~~~

~~

/jj;;:-;{;'.~

~

~

r.::::t~ii-'i



GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 251

M-PC-UO-,SUC-?ON,-NTG-YOE-E-, -V--E-H-IC--L-E-S-, --C-A-P-,-DP-RHE-OSA-CJIE-NRC-TI-TP.-T,-DIO-AJA-NT-CA-K-,--IM--M-E-R-S-I-O-N--C-L-E-A-N-E-R-,--C-A-M-E-R-A-,--E-T-C-,------------C-O-M-M-E-N-T-S--------------------------F-IYS-EC-AA-R-L-----..--CE-OS-TS-TS--

303013 TRANSIT PROJECTS/ CAPITAL

CONG OIST. 3 , 2

FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISR

CAPITAL 1994

$

460

FUND SOURCE: URBAN TRANSIT

FED SHARE$ 368

FEDER.AL TRANSIT ADMIN FUNos

GA. SRARE $

46

0TH SHARE$

46

MUSCOGEE EQUIP, REBUILD, FURNITURE, TIRE LEASE 303014 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGERt STEVE KISH

CONG DIST. 3 , 2
FUNO SOURCE: URBAN TRANSIT FEDER.AL TRANSIT ADMIN FUNDS

CAPITAL 1995

$ 201

FED SHARE$ 161

GA. SHARE$

20

0TH SHARE$

20

MUSCOGEE EQUIP. REBUILD, TIRE LEASE, FUEL BAY CONSTRUCTION 303015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST, 3 , 2
FUND SOURCE: ORBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$ 196

FED SHARE$ 157

GA, SHARE$

20

0TH SHARE$

20

MUSCOGEE PUBLIC TRANSIT SERVICE FOR COLUMBUS AND MUSCOGEE COUNTY 303016 TRANSIT PROJECTS/ OPERATIONS
FUNOS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
'
MUSCOGEE PUBLIC TRANSIT SERVICE FOR COLUMBUS AND MUSCOGEE COUNTY 3D3017 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 3 , 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $ FED SHARE$
GA, SHARE$
0TH SHARE$

2340 725
1615

CONG DIST. 3 , 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ FEO SHARE$
GA. SHARE$ 0TH SHARE$

2434 730
3 1707

MUSCOGEE PUBLIC TRANSIT SERVICE FOR COLUMBUS AND MUSCOGEE COUNTY 303018 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 3 g 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

2531 734 7
1804

MUSCOGEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 3Vl016 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN COLUMBUS MPO AREA
MANAGER: STEVE KISH

CONG DIST. 3 g 2

.

.

CAPITAL 1994

$

39

FUND SOURCE: ELDERLY g DISABLED FUND FED SHARE$

31

F~DERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

OTR SHARE$

4

r.v.np,~ I I\ l"'f.P I\PTMf.NT (')f" TIU\tlSPORTI\T ION
STJ\TF: TRANSPORTATION IMPROVEMENTS PROGRAM
PROJCT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 252

COUNTY P, I.NO,

DESCRIPTION PIWJCT DATA

MUSCOGEE ELDERLY ANO DISABLED VEHICLES ANO EOUIPMENT

FISCAL

COST

COMMENTS

YEAR

ESTS

-----------------------------------------------------~------

lV1017 TRANSIT PROJECTS / CAPITAL

CONG DIST, 3,, 2

FUNDS RECIPIENT: AGENCIES IN COLUMBUS HPO AREA MANAGER! STEVE KISH

CAPITAL 1995

$

FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE $

.FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

41 33
4

0TH SHARE$

4

MUSCOGEE ELDERLY AND DISABLED VEHICLES AND EOUIPHENT
lV1018 TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COLUMBUS HPO AREA
MANAGER: STEVE KISH

CONG DIST. 3, 2

CAPITAL 1996

$

42

FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$

34

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

MUSCOGEE I-185 BR WON, CORRECT s CURVE 9 CUSSETA RD C SCL RR
311155 BRIDGES/ RECST, OR REHAB. PROJECT MILEAGE : ,75 MANAGER:_ N. PASSMORE (H)

COLUMBUS TIP I 91-ST-2001
CONG DIST. J
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW NONE
CONST

UNDERWAY

$

0

AFTER 96

MUSCOGEE 1-185/COLUHBUS FM ST HA.RY'S NORTR TO BUENA VISTA: C JlY440 311440 RECONSTRUCTION C WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE: 1,17 MANAGER: N. PASSMORE
MUSCOGEE I-185/COLUHBUS FM SR 520 TO ST HA.RYS RO [EXCEP 0.43 HILE) 311445 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 2,83 MANAGER: N. PASSMORE (H)

COLUMBUS TIP I 91-ST-2001_ CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP f 91-ST-2001 CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY

ROW NONE $

0

CONST 19~4 $ 1898

FED SHARE $ 1518

GA. SHARE $ 380

0TH SHARE $

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

MUSCOGEE I-185 FH BUENA VISTA RO/COLUMBUS TO MACON RD: C 31Y450 311450 RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.33 MANAGER: N. PASSMORE

MUSCOGEE SR 22 ANO 411 (I-185) ... SLOPE IMPROVEMENTS

311570

PRELIMINARY ENGINEERING/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: J. GRAYBEAL
t.

COLUMBUS TIP I 91-ST-2001
CONG DIST. 2 & 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 3 FUND SOURCE:. I-STATE HAINT. FEDERAL 'HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY.

ROW NONE $

0

CONST 1994 $ 2692

. FED sHARE $ 2154

GA. SHARE $ 538

0TH SHARE $

PE 1994
ROW 1994 CONST NONE

UNDERWAY

UNDERWAY

$

0

.~

..

~

~

~ ~ ~ ~ JfitNI . ~ , ~ ~~ ~ f~~ lfi:ii::<~'.;;j ~tl:.

r-:

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 253

M-CP-UO-.SU-CI.NO-NT-GOY-EE-, --I--1-8-5---IN-T-E-R-C-H-A-N-DPGR-E-EOS-CJE-ARC-TI-TP-TS-RDIO-AN-T1-A----------------------------------------C-O-L-U-M-B-CU-OS-M-TM-IE-PN-TSI--9-1---S-T---2-0-0-1---------------PF-EIYS-EC-A1-AR9-L9-4-----$-CE-OS-TS-TS-2-61

311630 INTERCHANGE/ RECST. OR REHAB.

CONG DIST. 2

ROW 1996 $ 1500

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4

CONST

AFTER 96

MANAGER:

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

MUSCOGEE CALL BOXES ON I-185 FM SR 22/MUSCOGEE TO I-85/TROUP

311720 MISCELLANEOUS IMPROVEMENTS/ NEW CONSTRUCTION

PROJECT HILl!!AOE I ,00 - EXIST, LANES! 0 /PROPOSED LANES! 0

MANAGER:

.

MUSCOGEE I-185/COLUHBUS FH ST MARY'S TO BUENA VISTAt FOR IM$; 311440 31Yt40 UNKNOWN/ UNKNOWN
PROJECT MILEAGE I ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER!

MUSCOGEE I-185 FM BUENA VISTA TO MACON RO; FOR IH FUNDS; SEE 311450 31Yt50 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER!
MUSCOGEE SECOND AVE/COLUMBUS@ C OF GA RR BTWEN 16TH & 17TH STS 321670 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE: .35 MANAGER: BILL MOSKAL
MUSCOGEE SR 1/US 27/4TH AVE/COLUMBUS OVER C OF GA RR 321810 BRIDGES/ RECST. OR REHAB.
PROJECT HILl!!AGI!! : .25 MANAGER: D. CHURCH
MUSCOGEE SR 22 SER RD, LT,RT, WHITESVILLE RD BR TO .1 HI W OF HOON RD 322620 SHOULDER WORK/ MAINTENANCE
PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK

COLUMBUS TIP I 94-0T-2002
CONG DIST. 3 , 7 FUND SOURCE: I-STATE MAINT, FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 2 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 , 3 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 86-UD-3001
CONG DIST. 2 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP f 86-UD-3001 CONG DIST. 2 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 32Y810 IS AN ASSOCIATED PROJECT.
CONG.DIST. 3 FUND SOURCE: NAT'L HIGHWAY ~EDERAL HIGHWAY ADHIN FUNDS

PE 1994

$

u

ROW NONE

$

0

CONST 1996

$

t50

FED SHARE$ t05

GA. SHARE'$

45

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994

$

200

FED SHARE$ 190

GA. SHARE$

20

0TH SHARE$

PE NONE $

0

ROW NONE '$

0

CONST 1994 $ 300

FED SRARE $ 270

GA. SHARE$

30

0TH SHARE$

PE 1993 UNDERWAY ROW LOCL CONST 1995 $ 4702
FED SHARE$ 3762 GA, SHARE$ 940
0TH SHARE$

Pl!! 1992 UNDERWAY

ROW 1995 $ 2262

CONST 1996 $ 4958

FED SHARE$ 3966

GA. SHARE$

9'92

0TH SHARE$

PE NONI!! $

0

ROW 1994

$

0

CONST 1994

$

497

FED SHARE$ 398

GA. SHARE$

99

0TH SHARI!!$

l~f:()JH"; 111 ['lf'.PJ\llTMF'.NT nr TllJ\NSrORTIIT IOU STIITF. TRJ\NSPORTIITION IMPROVF.MEIJTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 254

COUNTY

DESCRIPTION

FISCAL

COST

P, I ,NO,

PROJECT DATA

COMMENTS

YEAR

!STS

M-U-S-CO--G-EE--S--R-1-/U--S-2-7/-4-T-H--A-V-E---IN---C-O-L-, --O-V-E-R--C-O--R-R----E-A-R-L-Y--R-/W---$------------------C-O-L-U-M-B-U-S--T-I-P--f--8-6---0-0---3-0-0-1---------------p-g--N-O-N-E-.---$------O

321810 BRIDGES/ RECST, OR REHAB,

CONG DIST, 2

ROW 1994 $ 786

PRC>.nCT HILEAOE: .00

GRIP PROJECT

.

CONST 1996 $

O

MANAGER! D, CHURCH.

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$-

321810 IS AN ASSOCIATED PROJECT:

OTR SHARE$

MUSCOGEE SR 22 SPUR@ AVALON RO/COLUMBUS . LEFT TURN LANES, SIGNAL 342490 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .20 - EXIST. LANES! 0 /PROPOSED LANES: 0 MANAGER: GORDON BROWN

COLUMBUS TIP f 93-SR-2001 COHO DIST, 3
FUND SOURCE: RWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1995 $ 140

FED SHARE$ 126

GA. SHARE$

4

0TH SHARE$

10

MUSCOGEE SR 22 SPUR/COLUMBUS@ SCRATULGA RD,.(INCL SIGNALS) 342630 INTERSECTION IMPROVEMENT/ TRAFFIC
PRC>.nCT MILEAGE : ,47 - EXIST, LANES! 0 /PROPOSED LANES! 0 MANAGER: GORDON BROWN
MUSCOGEE 13TH STREET BRIDGE OVER CHATTAHOOCHEE RIVER 350260 PRELIMINARY ENGINEERING/ NEW CONSTRUCTION
PROJECT MILEAGE : ,60 - EXIST, LANES1 0 /PROPOSED LANES1 4 MANAGER: BEN BUCHAN_ (M)

COLUMBUS TIP f 93-SR-2004 COHO DIST. 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 78-BR-1001
CONG DIST, 2
FUND SOURCE: BRIDGE PROGRAM FE~ERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1993 UNDERWAY

CONST 1994 $ 1'9

FED SHARE$ 159

GA, SHARE$

30

OTR SHARE$

10

PE 1976 ROW LOCL CONST

ONDERWAY AFTER 96

MUSCOGEE BUENA VISTA RO-PR II FM ANDREA DR TO SCRATULGA RD 350685 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES,
PROJECT MILEAGE : 1,35 MANAGER: BEN BUCHAN (CM)
MUSCOGEE SR 22 SPUR/MACON RO FM RIGDON RD TO CODY RD/EXCP@ I-185 .350690 INTERSECTION IMPROVEMENT/ RECST. OR REHAB,
PROJECT MILEAGE : .65 - EXIST, LANES: 4 /PROPOSED LANES: 6 MANAGER: R, ASHMORE
MUSCOGEE TALBOTTON RD/CS 1854/COLUHBUS FM 7TH AVE TO WOODRUFF/HILTON 350730 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 1,85 MANAGER: D. CHURCH (H)

COLUMBUS TIP I 86-SR-2005
CONG DIST. 3 , 2 FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 86-SR-1001
CONG DIST, 3 , 2 . FUND SOURCE: SURFACE TRANSPORT,
FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 86-SR-2007
CONG DIST. 2 , 3 FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $ ROW LOCL
CONST 1996 $ FED SHARE$
GA. SHARE$ 0TH SHARE$

106
3543 2834
709

PE 1992 ONDERWAY ROW 1994 $ 1500 CONST 1995 $ 1507
FED SHARE$ 1206
GA. SHARE$ 301
OTR SHARE$

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

" ..

~

~

.~<'

~*]

~~~s

~

~~~

,~

-,;.:.=-::.i

~

~


~

i':'.i~~~

r:i: _----::

_.,,

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

MUSCOGEE FORREST RO/COLUMBUS FM TRINITY RO TO TUPELO OR 350780 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.30 MANAGER: BEN BUCHAN (M)
l

COLUMBUS TIP f 79-SR-2003 CONG DIST; 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 255

FISCAL YEM
PE 1992 ROW LOCL CONST

. COST
---- ESTS
UNDERWAY
AFTER 96

MUSCOGEE FORREST RO/COLUMBUS FM FLOYD RD TO SCHATULGA RD 350785 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.90 MANAGER: BEN BUCHAN

COLUMBUS TIP I 79-SR-2016
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

MUSCOGEE ST MARYS RO/CS 2108/COLUMBUS FM BUENA VISTA TO ROBIN RO 350790 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: .75 MANAGER: BILL MOSl':AL
MUSCOGEE BUENA VISTA RO/COLUMBUS FM WYNNTON RO SE TO ILLGES RO 350796 RECONSTRUCTION, WIDENING FROM 2 LANES -TO 4 LANES.
PROJECT MILEAGE: 1.66 MANAGER: BILL MOSKAL (M)

COLUMBUS TIP I 79-SR-2020
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 86-SR-2010
CONG DIST. 2 , 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1996 $ 1580 FED SHAAE $ 1264 GA. SHARE$ 316 0TH SHARE$

PE 1992 ROW LOCL CONST

UNDERWAY
AFTER 96

MUSCOGEE 19TH ST FM 2ND AVE/SR 85 TO TALBOTTON AVE [OLO&NEW LOC) 350800 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .30 MANAGER: BILL MOSKAL (C)
MUSCOGEE SCHATULGA RD/CS 2228 FM BUENA VISTA RD TO MACON RD/SR 22 SP 350850 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.76 MANAGER: BEN BUCHAN (M)

COLUMBUS TIP I 86-IN-4002
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP I 92-SR-2003
CONG DIST. 2 , 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW LOCL CONST 1995 $
FED SHAAE $ GA. SHARE$ 0TH SHARE$

0
2480 1984
496

PE 1992 ROW LOCL CONST

UNDER"AY AFTER 96

MUSCOGEE FARR RO/CS 392 FH CUSSETA RO/CR 62 TO ST MARY'S RD/CS 2108 350860 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.05 MANAGER: BILL MOSKAL

COLUMBUS TIP I 91-SR-2001
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 ROW LOCL CONST

$

66

AFTER 96

~~0P:1A p~rARTH~NT nr TRANSPORTATION STATE TRANSPORTATION lHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 256

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO.

.

.PROJECT DATA

COMMENTS

YEAR

ESTS

M--U-SC-O--G-EE---SR---22---SP-/-M-A-C-O-N---R-D--F-M--W-O-O-O-R-U-F-F--F-A-R-M--R-D-/-C-R--9-9--T-O--S-R--2-2-/-U-S--8-0--------C-O-L-U-M-B-U-S--T--IP---I -9-3---B-R---1-0-0-2---------.------P-E---19-9-2-,-~--U-N-D-E-R-"A-Y

350870 RECONSTRUCTION, "IDENING FROM 2 LANES TO 4 LANES,

CONG DIST. 3

RO" 1996 $ 3000

PROJECT MILEAG~: 3.43

CONST

AFTER 96

MANAGERt D. CHURCH (M)

FUND SOURCE: NAT'L HIGH"AY

FEDERAL HIGHWAY ADMIN FUNDS

MUSCOGEE SR 22 SP/MACON RO@ BULL CREEK 350875 REHAB. OF THE EXISTING BRIOGE(SI. FROM 2 LANES TO 4 LANES.
PROJECT MILUGE : .02
MANAGERt D. CHURCH (M)

COLUMBUS TIP f 93-BR-1001
CONG OIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992
RO" NONE CONST

UNDERWAY

$

0

AFTER 96

MUSCOGEE SR 22 SP FM REESE RD/CS 2111 TO 9'000RUFF FARM RO/CR 99 350880 RECONSTRUCTION, "IOENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 1.67 MANAGER: D. CHURCH (M)
l
MUSCOGEE COMPUTERIZED SIGNAL SYSTEMS CBO COLUMBUS' OTHER SR INTER. 350940 SIGNALS/ TRAFFIC
PROJECT MILEAGE : .Ol - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER1 BURT RIDOLE

COLUMBUS TIP t 92-SR-2001
CONG DIST. 3
FUNO SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 2000 AFTER 96

COLUMBUS TIP I 93-0T-2005
CONG DIST. 3 , 2
FUNO SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993
ROW NONE CONST

UNDER"AY

$

0

AFTER 96

MUSCOGEE SOUTH RIVER"ALK BICYCLE/PEDESTRIAN FACILITY IN COLUMBUS 371010 BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: MEG BRYSON
MUSCOGEE BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 3/SEE 37Y040 371040 BRIDGE PAINTING/ MAINTENANCE
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
MUSCOGEE BRIDGE PAIN.TING PROJECT FOR FY 1994 - DISTRICT 3/SEE 371040 37Y040 BRIDGE PAINTING/ MAINTENANCE
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

COLUMBUS TIP t 94-0T-2001
CONG DIST. 2 , 3 FUNO SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNOS
CONG DIST. 99 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 99 FyND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS

PE LOCL
RO" LOCL CONST 1996 $
FED SHARE$
GA. SHARE$ 0TH SHARE$

3255 2604
651

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 441

FED SHARE.$ 353

, GA, SHARE $

88

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 564

FED SHARE$ 508

GA. SHARE$

56

O.TH SHARE $

,,

,1.,

..

l!!E ~

~,,

= ~

~~~~,

~~~~

~

~

~

)ii~

= ~

Wit<!ii'$

t~f(J~jj . );)'::.: ;:;.~;

.t~. . . :!

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

NEWTON 210530

I-20@ SR 142/COVINGTON (INCL llf:LOC OF FRONTAGE RD/CR 72) INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE: .OO - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: D. CHURCH

CONG DIST. 10
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS

'

16-Sep-1993 Page 257

FISCAL.

COST

YEAR

ESTS

P-E---1-9-9-3-----U-N-DE-R-W--AY

ROW

AFTER 96

CONST

AFTER 96

NEWTON 210640

I-20 AT GA. RR, ALCOVY RD, ALCOVY RVR, OVERFLOW BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:

NEWTON 222040

SR 36/COVINGTON FM OLD MONTICELLO RD TO CR 348/PETTY ST TURN LANES/ TRAFFIC PROJECT MILEAGE : 1.10 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH

NEWTON 231290

SR 36@ CR 653/JACRSON ROAD (COVINGTON BYPASS) INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .38 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH

NEWTON 241980

SR 12@ SR 142 (TURN LANES, UPGRADE TRAFFIC SIGNAL) INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .30 - EXIST. LANES: 2 /PROPOSED I.ANS~: 3 MANAGER: D. GRIFFITH

N'9TON 242100

SR 162 Q CR 29/RIRRLAND RD ANO CR 393/0LD CONCORD RO INTRSECTION IMPROVEMENT/ TRAFFIC PROJECT MILAGE: .43 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GRIFFITH

NEWTON 73090X

SR 20 FM SR 212/NEWTON N TO HONEY CREER RO/SEE ROCKDALE CO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. CHURCH

CONG DIST. 10 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN .FUNDS
CONG DIST. 10 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 231290 IS AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 222040 IS AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 4 FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP IR 028 CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 730907 IS AN ASSOCIATED PROJECT.

PE 1994

$

ROW NONE $

CONST 1996 $

FED SHARE$

GA. SHARE$

0TH SHARE$

84 0
2812 2531
281

PE 1993

UNDERWAY

ROW 1994

$

50

CONST 1996 $ 1054

FED SHARE$ 949

GA. SHARE $ 105

0TH SHARE$

PE 1994 $

10

ROW LOCL

CONST 1996 $ 230

FED SHARE$ 207

GA. SHARE$

23

0TH SHARE$

PE 1992 UNDERWAY

ROW LOCL

CONST 1994 $ 517

FED SHARE$ 465

GA. SHARE$

52

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 327

FED SHARE$ 294

GA. SHARE$

33

0TH SH.ARE$

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

,:,=-,,pr: I" r,r.rllPTl-lf.llT r,r TRIIIISrORTIITIOII STIITE TIU\NSPORTI\TlON IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 258

COUNTY

DESCRIPTION

FISCAL

COST

P,!,NO,

.PROJECT DATA

COMMENTS _

YEAR

. ESTS

O--C-O-N-!-! ---S-R--1-0-/-U-S--7-8--M--O-N-R-O-! -T-O---A-T-H-E-N-S--M-E-D-IA-N---O-P-!N--IN-G--1 --S-E-E--W-A-L-T-O-N--------------------------------------------------P-E--1-9-9-4-.----$------O

12257X UNltNOWN / UNltNONN

CONG pIST, 10

ROW NONE $

O

PRO~CT HILEAGE t .00 - EXIST, LANES! 0 /PROPOSED LANES: 0

CONST 1994 $

O

MANAGER: UNKNOWN

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$

0TH SHARE$

OCON!! 132340

SR 10 FM ALCOVY RIVER/WALTON TRRU OCONEE TO SR .8/CLARKE

GUARDRAIL/ TRAFFIC

,

PRO~CT HILEAGE I 10,10 - EXIST, LANES! 4 /PROPOSED LANES: 4

MANAGER! L, SEABROOK

PE 1994 $

25

CONG DIST, 10

ROW NONE_ $

0

CONST 1996 '$ 830

FUND SOURCE: NAT'L RIGRWAY

FED SHARE$ 830

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$

13234X IS AN ASSOCIATED PROJECT,

0TH SHARE$

OCONEE 150210

.CR 473/EPPS BRIDGE RD FH SR 10 TO SR lOBUS/US 78/CLAAAE CO RECONSTRUCTION I WIDENING FROM 2 LANES TO 4 LANES,
cc, PROJECT MILEAGE t 3.30
MANAGER I H. ASHMORE

ATHENS TIP f II-03 CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 150215 IS AN ASSOCIATED PRO~CT.

PE 1992 ONDERWAY ROW ,1994 $ 2700 CONST 1995 $ 10373
FED SHARE$ 8298
GA. SHARE$ 228
0TH SHARE$ 1847

. OCON!! 150215

EPPS BRIDGE RD@ MCNUTT CM/ALSO CLARi! CO REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES .
PROJECT MILEAGE I .50 MANAGER: H. ASHMORE (C)

ATHENS TIP f iI-03 CONG DIST. -10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 150210 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 896

FED SRARE $ 717

GA, SHARE$ 179

0TH SHARE$

-~ ~

*,.



~

~

t~~:~ == ~
~

~J

~

~]?~~

~

~~

~

~~

~~

JM~~~~

1,:~.,;_ ::;'

.. .:

,

GEORGIA DEPI\RTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 259

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,l,NO,

PROJECT DATA

COMMENTS

YEM

l!!STS

O-2C-2L-2l-0!!5-TH0-O-R--RS-RE-P-L-7A7-C-E-EM-A-ESNT--T-o-or-r-L-ET-HX-EIN--GE-TX-OI-SN-T@-IN-G-B-IG-B-R-IIN-O-DG-IA-E-NS-(S-C)-R.-E-EN-KO--A-D-D-E-O--L-A-N-E-S-,-----------C-O-N-G--D-I-S-T-.--1-0--------------------------R-OP-WE--11-99-99-43-----U$-N-D-ER-W--AY1

PROJECT MILEAGE : ,JO

CONST 1995 $ 397

MANAGER: 0, GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 310

(

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$

77

222052 IS AN ASSOCIATED PROJECT.

0TH SHARE$

OCLl!!THOR SR 77 EAST or LEXINGTON@ LITTLE INDIAN CRF.ER 222052 REPLACEMENT or THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : ,55
MANAGER! 0, GRIFFITH

CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 222050 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW 1994

$

500

CONST 1995 $ 410

FED SHAil!!! $ 328

GA. SHARE $

82

0TH SHARE$

OCLETHOR CULVERT EXT@ VAR LOC ON STATE ROUTES,,GREENE/TALIAF
27087X BRIDGES/ MAINTENANCE PROJECT MILEAGE : ,00 MANAGER: L, SEABROOK

PE NONE $

0

CONG DIST. 2

ROW 1994 $

0

CONST 1994 $

0

FUND SOURCE: SURFACE TRANSPORT,

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SRARE $

270870 IS AN ASSOCIATED PROJECT.

0TH SHARE$

i:F:nRGIJ\ l>EPJ\PTMENT Of' TRJ\tlSPC>RTJ\TION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 260

P-ACP-OO-.IU-L.NO-NT-IONY-G-. -C-O-U-N-T-Y--O--PE-R-A-T-E-D-DPR-E-OPS-UCJE-BRC-LI-PTIC-T-IDO-ATN-TR-AA-N-S-I-T--S-E-R-V-I-C-E----------------------------------C-O-M-M-E-N-T-S--------------------------F-IY-SE-CA-AR-L--

COST ESTS

681373 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 7

FUNDS RECIPIENT: PAULDING MANAGER: STEVE KISH

OPERATING 1994 $

54

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

31

GA. SHARE$

0TH SHARE$

23

PAULDING COUNTY OPERATED PUBLIC TRANSIT SERVICE 681374 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: PAULDING MANAGER: STEVE KISH

CONG DIST. 7

OPERATING 1995 $

56

FUND SOURCE: RURAL TRANSIT

FED SHARE$

32

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

24

PAULDING COUNTY OPERATED PUBLIC TRANSIT SERVICE 681375 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: PAULDING MANAGER: STEVE KISH

CONG DIST. 7

,

FUND SOURCE: RURAL TRANSIT

OPERATING 1996 $

58

FED SHARE$

33

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

25

PAULDING ONE STANDARD VAN 6C2373 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: PAULDING
MANAGER: STEVE KISH

CONG DIST, 7

CAPITAL 1994

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

PAULDING SR 61/DALLAS@ SOUTHERN RR 620834 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
PROJECT MILEAGE: .38
MANAGER: BILL MCVEY

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1994 $ 1175 CONST 1995 $ 1308
FED SHARE $ 1046
GA. SHARE $ 262 0TH SHARE $

PAULDING SR 92@ LICK LOG CREEK 621020 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .50
MANAGER: BILL MCVEY

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 UNDERWAY ROW 1988 UNDERWAY CONST 1994 $ 554
FED SHARE $ 443
G~. SHARE $ 111 0TH SHARE $

PAULDING SR 92@ SCL RR 621022 REHAB. OF THE EXISTING BRlDGE(S). FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .13 MANAGER: BILL MCVEY (M)

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

..,

., ...

~

es

~ .- ,,

~

~i~

~

~-

~

~

~

~

~

~~

r.,-:, "-':::

~~,

...

GEORGIA DEPhRTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 261

COUNTY

DESCRIPTION

FISCAL COST

P,l,NO,

PROJ!:CT DATA

COMMENTS

YEAR

ESTS

PA-U--LD--IN-Q--S-R---1-2-0--FM---SR---6-/U--S--2-7-8--N-E--T-O--T-H-E--C-O-B-B--C-O--L-I-N-E-------------------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-WAY

621150 RECONSTRUCTION, WIDENING .FROM 2 LANES TO 4 LANES.

CONG DIST. 7

ROW 1992 UNDERWAY

PROJECT MILEAGE : 4,28

CONST 1996 $ 9478

MANAGER: RON BRAZIEL

FUND SOURCE: SURFACE TRANSPORT;

FED SHARE$ 7582

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE'$ 1896

0TH SHARE$

PAULDINQ SR 61/DALLAS FH SR 120 CONN TO SR 6/US 278 621570 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.20 MANAGER! RON BRAZIEL (H)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$

59

AFTER 96

AFTER 96

PAULDING SR 120 9 3 LOC IN HARALSON, PAULDING co ... SEE HARALSON
62158X UNl':NOWN / UNKNOWN PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
PAULDING CR 440/CR 470/CR 441 FM CR 168 TO SR 6/PAULDING .. SEE POLK 631141 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNl':NOWN
PAULDING SR 61@ CR 341/LEFT TL@ ML 9.99tREHOVE RR BR TO @GRADE XING 641830 BRIDGE ltEHOVAL / TRAFFIC
PROJECT MILEAGE : .17 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: BILL MCVEY
PAULDING SR 92 AT SR 120 CONNECTOR IN HIRAM 641980 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 621580 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 631148 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: RWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

PE 1992 ROW CONST

UNDERWAY
AFTER 96 AFTER 96

PE 1993 UNDERWAY

ROW LOCL CONST 1995

$

. 228

FED SHARE$ 205

GA. SHARE$

23

0TH SHARE$

PE 1994 $

9

ROW 1995 $

10

CONST 1996 $ 289

FED SHARE$ 260

GA. SHARE$

29

0TH SHARE$

1.

COUNTY P,I .NO,

DESCRIPTION PROJECT DATA

~~OPGIA u~rAPTHENT OF TRANsrnRTATION STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

PEACH 381233

COUNTY OPERATED PUBLIC TRANSIT SERVICY. TRANSIT FACILITIES/ OPERATiONS FUNDS RECIPIENT: PEACH MANAGER: STEVE KISH

W. ROBINS TIP I
CONG DIST. 2 , 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

PEACH 381234

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PEACH MANAGER! STEVE KISH

W. ROBINS TIP I
CONG DIST, 2 , 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

PEACH 381235

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PEACH MANAGER: STEVE KiSH

W. ROBINS TIP t
CONG DIST. 2 , 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

PEACH 3C2234

ONE CONV. VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PEACH MANAGER: STEVE KISH

W, ROBINS TIP t
CONG DIST. 2 , 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

PEACH 311540

1-75@ SR 96 INTERCHANGE/ llECST. OR REHAB. PROJECT MILEAGE 1 1.00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER! RON BRAZIEL (HI

CONG DIST, 2
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 262

FISCAL YEAR

COST ESTS

OPERATING 1994

$

0

FED SHARE$

29

GA. SHARE$

0TH SHARE$

20

OPERATING 1995

$

51

FED SHARE$

30

GA. SHARE$

0TH SHARE$

21

OPERATING 1996 $ FED SHARE$ GA, SHARE$
0TH SHARE$

54 .,
32 22

CAPITAL 1995

$

54

FED SHARE$

43

GA. SHARE$

6

0TH SHARE$

5

PE 1993 ROW 1995 CONST

UNDERWAY

$

912

AFTER H

PEACH 311780

1-75: CR 182/WHITE ROAD OVER I-75 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : ,00 MANAGER!

PEACH 320960

SR 96/VINEVILLE ST FM CAMPUS ST/CR 617 TO ANDERSON ST/CS 621 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES,
PROJECT MILEAGE _: 1 , 13 MANAGER: GORDON BROWN

CONG DIST. 3 FUND SOURCE: I-STATE HAINT, FEDERAL HIGHNAY ADHIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FED_ERAL HIGHNAY ADHIN FUNDS

pg 1994

$

ROW 1995 $

CONST 1996 $

FED SHARE$

GA. SHARE$

0TH SHARE$

10 1.
139 125
14

PE 1992 UNDERWAY ROW 1995 $ 1175 CONST 1996 $ 757
FED SHARE $ 606 GA. SHARE $ 151 0TH SHARE $



..

..
~t
II

ffie

~

~

~

~ffl

~

~~

~~-

~

~

~

~

~

.~;~~~. ::~!

c:

GEORGIA DEPMTHENT OF TRANSPORTATION STATE TRANSPORTATION IHPROVEHENTS PROGRAM

16-Sep-1993 Page 263

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL . COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-PE-A-C-H-----S-R--2-4-7---C---FH---SR---4-9--T-O--I--7-5-/-I-N-C--L--P-A-A-A-L-L-E-L--B-R-@---S-O-U-T-H-E-R-N--R-R-------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

321660 RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.

CONG DIST. 2 ' 3

ROW 1996 $ 614

PROJ!:CT MILEAGE: 3.00

CONST

AFTER 96

MANAGER: H, ASHMORE

FOND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADHIN FUNDS

PEACH 322380

SR 49@ BIG INDIAN CRK SW or FORT VALLEY REPLACEMENT or THE EXISTING BRIDGES(S). NO .ADDEO LANES.
PROJ!:CT MILEAGE: ,45
MANAGER: GORDON BROWN

Pl'!ACH 331940

SR 42 rH NEAR OLD FT VALLEY RD EAST TO SR 49 SW OF CHURCH ST
CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : ,47 MANAGER! GORDON BROWN

PEACH 371250

FORT VALLEY DEPOT, LANDSCAPING, PEDESTRIAN WAYS MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 3 , 2 FUND SOURCE: BRIDGE -PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY .ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$

5

CONST 1995 $ 608

FED SHARE $ 486

GA. SHARE $ 122

0TH SHARE $

PE 1993 UNDER"AY

ROW 1995 $

32

CONST 1996

$

530

FED SHARE $ 424

GA. SHARE $ 106

0TH SHARE $

Pl!: 1996

$

20

RO" 1996 $

86

CONST 1996 $ 175

FED SHARE$ 140

GA. SHARE$

21

0TH SHARE$

56

GF:UR1;111 flF:PflRTHF:NT or TRJ\ll!':rORTflTION
STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 264

COUNTY P.1.NO.
PICUNS

COUNTY

OPERATEDDPREPOSUCJEBRCLITPICTIDOATNRTAANSIT--S-E-R--V-IC-E----------------------------------C-O-M--M-E-N-T-S-------------------------F-IY-SE-CA-AR-L----.

COST ESTS

SB1J78 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: PICKENS MANAGER: STEVE ~ISR

OPERATING 1994 $

'6

FUND SOURCE: RURAL TRANSIT

FED SHARE$

39

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

27

PIC~ENS SB1J79

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PICKENS MANAGER: STEVE RISH

CONG DIST. 9

OPERATING 1995 $

69

FUND SOURCE: RURAL TRANSIT

FED SHARE$

u

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

28

PICKENS SBlJB0

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PICUNS MANAGER! STEVE RISH -

CONG DIST. 9

OPERATING 1996 $

72

FUND SOURCE: RURAL TRANSIT

FED SHARE$

42

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$

0TH SHARE$

29

PICKENS 6C2J78

TWO CONVERSION VANS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PICUNS MANAGER1 STEVE RISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

CAPITAL 1994

$

56

FED SHARE$

45

GA. SHARE$

5

0TH SHARE$

6

PICKENS 621490

SR 53 FM SR 515/APD TO CR 243/INDUSTRIAL BLVD RECONSTRUCTION, WIDENING FROM 2 LANES TO 3 LANES. PROJECT MILEAGE : 1.40 MANAGER1 R FULBRIGHT (M)

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

PICKENS 621640

SR 53 EB HP 7.25-8.4: WB HP 8.4-10.05 ADDITION OF A PASSING LANE. PROJECT MILEAGE: 2.70 MANAGER: BILL HCVEY (H)

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 278 AFTER 96

PICKENS 621830

SR 53 AT SPRING STREET IN JASPER INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS

PE NONE $

0

ROW 1995 $

1

CONST 1996 $

40

FED SHARE$

40

GA. SHARE$

0TH SHARE$

,_<



..

~

fffSffl

= ~ ,,~

~

~

~

~ ~

~-~

~

r~ n-=iw

~

14;-:,:i~

,;.,; ;'.:--.j

'

,,

GEORGIA DF.P~TMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 265

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL COST

P,I.NO.

PROJECT DATA

COMMENTS

YEAR

!STS

-PI-C-K-E-N-S---S-R---5-1-5--FM---C-R--3-0-0--(-P-IC-K--E-N-S-)--T-O--U-N-I-O-N--C-L---A-N-D--F-A-N-N-I-N-/-G-IL-M--E-R------------------------------------------------P-E--N-O-N-E-----$------0

S70800 RIDING SURFACE RERABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST, 9

ROW NONE $

0

PROJECT MILEAGE : 48,26 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $ 1823

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT,

FED SHARE$ 1458

FEDERAL HIGHWAY ADHIN FUNDS

GA, SHARE $

3g5

67080X IS AN ASSOCIATED PROJECT.

0TH SHARE$

(

COUNTY ,.1.No.

DESCRIPTION PROJECT DATA

r.F:nRr.111 f:lF:r/\PTMENT OF TR/\tlSPORT/\TlON ST/\TF, TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

Pl!RC! 5B1313

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PIERCE MANAGER: STEVE KISH

CONG DIST, 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

PIERCE 5B1314

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: .PIERCE MANAGER: STEVE KISH

CONG DIST, 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

Pl!RCE 5B1315

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PIERCE MANAGER: STEVE KISH

PIERCE 5C2313

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PIERCE MANAGER: STEVE KISH

CONG DIST. l

FUND SOURCE: RURAL TRANSIT

(.

FEDERAL TRANSIT ADMIN FUNDS

CONG DIST. l
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

PIERCE 521710

SR 15/121@ UNNAMED STRH:ALABMA RVR, OFL";TAN TROUGH CRK
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .80 MANAGER: PETE BLOCKER

CONG DIST, 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PIERCE . 531280

SR 203@ ALABAHA RIVER OFLW NW/BLACKSHEAR
REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PIERCE 531285

SR.203@ ALABAHA RIVER NW/BLACKSHEAR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: PETE BLOCKER

. . CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FED~RAL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 266

FISCAL YEAR

COST ESTS

- .- -------

OPERATING 1994 $

39

FED SHARE$

23

GA, SHARE $

0TH SHARE$

u

OPERATING 1995

$

41

FED SHARE$

24

GA. SHARE$

0TH SHARE$

1'1

OPERATING 1996 $

43

FED SHARE$

25

GA, SHARE$

0TH SHARE$

18

CAPITAL 1994

$

28

FED SRARE $

22

GA. SHARE$

3

OTR SHARE$

3

PE 1989

UNDER"AY

ROW NONE $

0

CONST 1994 $ 2344

FED SHARE $ 1875

GA. SHARI!: $ 469

0TH SHARE $

PE 1993 UNDER"AY

ROW 1994

$

5

CONST 1995 $ 386

FED SHARE $ 309

GA, SRARE $

77

0TH SHARE $

PE 1993 ONDER"AY

ROW 1995 $

1

CONST 1995 $ 745

FED SHARE $ 596

GA, SHARE $ 149

OTR SHARE $

.. ..

~

~ . ~.,

~m

~

~s~

~ IJ,~

~~

~_j.!{d

~=~,

~

~

~~

i?.i:.:f:~t~

. :_:.:;;-

.. f :

GEORGIA DEPARTMENT orTRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 267

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL . COST

P, I.NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

-PI-E-R-C-E----S-R---15--O--V-ER---B-U-R-N-EY---B-R-A-N-C-H--IN---B-L-A-C-~-S-H-E-A-R-------------------------------------------------------------------P-E--1-9-9-4-----$------10

532470 R.!PLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LAtfES.

CONG DIST. 1

ROW 1996 $

l

PROJECT MILEAGE: .00

CONST

AFTER 9fi

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADHIN FUNDS

C.

1:F:()J~r, I I\ PF:Pl\llTMF:NT OF TPAflSrORTI\T IOtl STI\TE TRNISPORTI\TlON IMPROVEMENTS PROGRAM PROJECT LISTING BY .COUNTY FY 1994/FY 1996

16-Sep-1993 Page 268

P-CP-IOK-,IU-!,N-NT-OY--, -R--E-A-L-IG-N---SR---3-6-2-/DPW-RE-IOSL-CJL-ER-ICIA-TP-HT-SIDO-OA-NTN-A@---Z-E-B-U-L-O--N-tP-I-N-E-:H-A--R-V-A-R-O-------------------------C-O-M-M-E-N-T-S--------------------------FP-IEY-SE-CAN-ARO-LN-E--~-$-CE-SO~TS-ST--O

322100 RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED.

CONG DIST, 3

RON 1994 $ 386

PROJECT MILEAGE : ,31

CONST 1994 $ 371

MANAGER! GORDON BROWN

FUND SOURCE: SURFACE TRANSPORT,

FED SHARE$ 297

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

74

,OTR SHARE $

PIU 363720

CR 160/ROBERTS QUARTERS ROAD: OVER ELKINS CREER

REPLACEMENT OF THE EXISTING BRIOGES(S), NO ADDEO LANES,

PROJECT MILEAGE: .oo

l

HANAGER1

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

ti

RON LOCL

CONST 1995

$

382

FED SHARE$ 30ti

GA, SHARE$

76

OTR SHARE$

PIKE
3707U

CR 51 9 NN CTY LIMITS/ZEBULON 9 ELKINS CREER
REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDEO LANES,
PROJECT MILEAGE: .oo
HANAG!R1 GORDON BROWN

CONG DIST, 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PB 1994 $ ROW LOCL CONST 1995 $
FED SHARE$ GA, SHARE$
OTR SHARE$

5
325 260,
ti5

f

. ,

..

eme

~

~ ~e

,.

J

,

~

~

~
l'=m,;I

~

-=.i;i

u;:.-2.,!J

= -

~...:!~ !il"..-.~.:id tr~-:'c -~i

,>

COUNTY P, I.NO,

DESCRIPTION PROJECT OAT.I\

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

POLK 6B1417

CITY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF CEDARTOWN MANAGER: STEVE KISH

CONG OIST, 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

POLK 6B1418

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF CEDARTOWN MANAGER: STEVE KISH

CONG OIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

16-Sep-1993 Page 269

FISCAL . COST

YEAR

ESTS

------------------

OPERATING 1994 $

22

FED SHARE$

13

GA. SHARE $

0TH SR.ARE$

9

OPERATING 1995 $

30

FED SHARE$

17

GA. SHARE$

0TH SHARE$

13

POLK 691419

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF CEDMTOWN MANAGER: STEVE KISH

CONG OIST. 7

OPERATING 1996 $

32

FUND SOURCE: RURAL TRANSIT

FED SR.ME $

19

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

14

POLK 6C2417

ONE STANDARD VAN ANO ONE MOBILE RADIO TRANSIT.FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF CEOARTOtm MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1994

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE $.

17

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

2

0TH SHARE $.

2

POLK 620645

SR 6 FH OLD CEDARTOWN RO/CR 193 E TO SR 101 IN ROCRHART RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.27 MANAGER: RAY METTS (H)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST .

UNDERWAY
$ 2500 AFTER 96

POLK 620647

SR 6 rH CR 154 EASTERLY TO OLD CEDARTOWN RO/CR 193 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.60 MANAGER: RAY METTS (HI

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHNAY ADMIN FUNDS

pg 1992
ROW 1996 CONST

UNDERWAY
$ 892 AFTER 96

POLK 621420

SR 113 FM ROCKMART BYP/CR 433 TO TAYLORSVILLE CTY LMT/CR 249 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.50 MANAGER: M GANNAWAY (Cl

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHNAY ADMIN FUNDS

PE 1993 ROW 1995 CONST

UNDERWAY $ 2006 AFTER 96

GEORGIA PEPARTHEIIT Of TP~N$PORTATION STATE TRJ\NSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 270

COUNTY

DESCRIPTION

FISCAL

COST

p, I.NO.

PROJECT DATA

COMMENTS

YEAR

.. ESTS

PO-L-K------S-R---11-3--r-H--T-A--Y-L-O-R-S-V-I-L-L-E--C-L--T-O--C-R--3-1-/S-T-I-L-E-S-B--O-R-O--,,-S-E-E--B-A-R-T-O-"------------------------------------------------P-E--N-O-N-E-----$---- O

Ul43X UNKNOWN / UNKNOWN .

CONG DIST, 7

RO" 1994 $

O

PROJECT MILEAGE : 4.59 - EXIST. LANES: 0 /PROPOSED .LANES: 0

CONST

AFTER 96

MANAGER: M GANNAWAY

FUND SOURCE: SURFACE TRANSPORT,

FEDERAL RIGRWAY ADMIN FUNDS

621430 IS AN ASSOCIATED PROJECT,

POLK 621470

SR 1/US 27 OVER CEDAR CREEK NEAR CEDARTOWN REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 5 LANES,
PROJECT MILEAGE : ,21 MANAGER! J. GRAYBEAL

CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1996 $ 293

FED SHARE$ 226

GA, SHARE$

57

0TH SHARE$

POLK 621475

SR 1/US 27: BRIDGE OVER CEDAR CREEK TRIBUTARY SE CEDARTOWN REHAB, OF TRE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE: ,00 MANAGER! J, GRAYBEAL

CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGH"AY AOHIN FUNDS 621325 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1996 $ 133

FED SHARE $ 10,

GA. SHARE OTH.SHARE

$ $

27.

POLK 62Y645

PART or R/W $ FOR 620645
UNKNOWN/ UNltNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST, 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONI!: ROW 1996 CONST N(!NE

$

0

$ 1000

$

0

POLK 631149

CR 440/CR 470/CR 441 FM CR 168/POLK TO SR 6/US 278/PAULDING RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE: 6.53 MANAGER: BILL MCVEY (H)

CONG DIST; 7
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AFTER 96 AFTER 96_

POLK 631UX

CR 342/CR 440 FH CR 345/HARALSON TO CR 168/POLK-SEE HARALSON UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

POLK 63118X

SR 100 CLVT WON FH TALLAPOOSA TO CEDARTOWN .. ,SEE HARALSON UNKNOWN/ UNKNOWN PROJECTHILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 631145 IS AN ASSOCIATED PROJECT.
CONG DIST, 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 631180 IS AN ASSOCIATED PROJECT ..

PE 1992 ROW CONST
PE_ 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96
UNDERWAY AFTER 96 AFTER 96.

.,, ..

4

'I

~

~

,. = ~

~.,

~

~

~

f~~ll ~

~

~

/i.1-i1$.'.~ .~:.:a~

:.::-::<'::1

,,

,:

GEORGIA OEPARTMENT OF TllANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-19H Page 271

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

POLK

CR 439/LIHE BRIDGE ROAD OVER McCUR.RY CREEK

FISCAL

COST

COMMENTS

YEAR

ESTS

----------------------P-E--1-9-9-3-----U-N-O-E-R-"A-Y

631280 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES,

CONG DIST. 7

ROW LOCL

PROJECT MILEAGE : 10

CONST

AFTER 9ti

MANAGER: BILL MCVEY

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

POLK
641880

SR lBUS, FM PLANTATION AVE TO SOUTH OF CEDERTOWN BYPASS TURN LANES/ TRAFFIC PROJECT MILEAGE 1 1,08 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER! BILL MCVEY

POLK 670540

CR 450/N CAVE SPRING ST/CEDARTOWN@ SKEETER CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .17 MANAGER! BILL MCVEY

POLK 670676

CR 6/LAJtE CREEK RD@ LARE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: BILL MCVEY

POLK 670900

OLD CSX RAILROAD CORRIDOR FROM CEDARTOWN TO ALABAMA BICYCLE/Pim. FACILITY / ENHANCEMENT PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 7 GRIP PROJECT FUND SOURCE: NAT'L HIGH"AY FEDERAL HIG~WAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

13

ROW 1995 $

5

CONST 1996 $ 435

FED SHARE$ 435

GA. SHARE$

0TH SHARE$

PE 1994 $

5

ROW LOCL

CONST 1996 $ 210

FED SHARE$ 168

GA. SHARE$

42

0TH SHARE$

PE 1991 ONDER"At

ROW LOCL

CONST 1994 $ 321

FED SHARE$ 257

GA. SHARE$

64

0TH SHARE$

PE LOCL

ROW 1994 $

28

CONST 1994 $ 407

FED SHARE$ 326

GA, SHARE$

6

0TH SHARE$

87

L

or <:F:ORGI /I ()F:PI\RTMF:NT

TRI\NSPORTI\Tlotl

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 272

COUNTY

DESCRIPTION

FISCAL

COST

P,l,NO,

PROJECT DATA

l

COHHl!:NTS

YEAR . ESTS

PU--L-A-SK--I --C-O-U-N-T-Y--O--PE-R-A--TE-D---P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E---------------------------------------------------------------------------.-~-------

381239 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 9

FUNDS RECIPIENT: PULASKI MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

OPERATING 1994 $

22

FED SRME $

13

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

OTR SKARE$

9

PULASKI 381239

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PULASKI MANAGER! STEVE KISH

CONG DIST. 9

OPERATING 1995 $

22

FUND SOURCE: RURAL TRANSIT

FED SRARE $

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SRARE $

OTR SHAU$

9

PULASKI 381240

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PULASKI
MANAGER: STEVE KISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

OPERATING 1996 $

24

FED SHARE$

14

GA. SHARE$

0TH SHARE$

10

PULASKI JC22J9

ONE CONVERSION VAN WITR LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CI\.PITAL FUNDS RECIPIENT: PULASKI HANAGERr STEVE KISH

CONG DIST. 9

CI\.PITAL 1994

$

J2

FUND SOURCE: RURAL TRANSIT

FED SRAJUI! $

26

FEDERAL TRANSIT ADHIN FUNDS

GA. SRARE $

J

OTRSHAU $

3

PULASKI JJ1620

SR 230@ SOUTH PRONG BIG TUCSAWHATCHEE CRK W/HAWP:INSVILLE REPLACEMENT OF THE EXISTING BRIDGES(SJ. NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: GORDON BROWN

CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAH F~DERAL HIGHWAY ADHIN FUNDS

PE 1993 ONDERWA?

ROW 1995 $

15

CONST 1996 $ 500

FED SRAJUI! $ 400

GA. SRAJUI! $ 100

OTR SHARE $

PULASKI 332030

SR 11/US 341 OVER TOWN CREEK NORTH OF HAWP:INSVILLE
REHAB. or THE EXISTING BRIOGE(S). FROM 2 LANES TO J LANES.

PROJECT MILEAGE : ,00

.

H['NAGER1 H. ASHMORE

CONG DIST .8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAH FEDERAL HIGHWAY ADMIN FUNDS 322170 IS AN ASSOCIATED PROJECT.

PE NONE $

0

ROW NONE $

0

CONST 1995 $ 246

FED SHARE$ 197

GA. SRARE $

49

0TH SHARE$

..

,,

., ...

"!

-~

~

~

~

~

~

~

~

~

~K!

~

-~

~fjff::~

i>li~:~,i

~:i:t':~i':

1~:-- . ., ..
,.1

..

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 273

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

PU-T-N-A-M----C-O-U-N-T-Y--O-P-E-R-A-T-E-D---P-U-B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E----------------------------------------------------------------------------------

2Bllfi3 TRANSIT FACILITIES. / OPERATIONS

CONG DIST. 11

FUNDS M:CIPIENT: PUTNAM MANAGER: STEVE KISH

OPERATING 1994 $

65

FUND SOURCE: RURAL TRANSIT

FED SHARE$

38

FEDERAL TRANSIT ADHIN FUNDS

GA, SHARE$

OTR SHARE$

26

PUTNAM 2Bll64

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1995 $

61

FUND SOURCE: RURAL TRANSIT

FED SHARE$

39

'

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

28

PUTNAM 2Bll65

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1996 $

10:

FUND SOURCE: RURAL TRANSIT

FED SHARE$

41

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

29

PUTNAM 2C2163

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISR

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1994

$

32

FED SHARE $-

26

GA. SHARE$

3

0TH SHARE$

3

PUTNAM 2C2165

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH

CONG DIST. 11

FUND.SOURCE: RURAL TRANSIT

CAPITAL 1996

$

21

FED SHARE$

11

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

PUTNAM 221840

SR 44 FM SR 16 NORTH/EATONTON TO HP 2.89/GREENE CO RECONSTRUCTION, WIDENING, NO LANE ADDITION PROPOSED. PROJECT MILEAGE: 13,09 MANAGER: D, GRIFFITH

CONG. DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL ~IGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY
AFTER 96 AFTER 96

PUTNAM 222020

SR 16@ LITTLE RIVER W/EATONTON
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .57

..

MANAGER: D. GRIFFITH

CONG DIST. 11
" FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHNAY ADMIN FUNDS

PE 1993 UNDER"AY ROW 1993 UNDER"AY CONST 1995 $ 1200
FED SHARE $ 960
GA. SHARE $ 240 OTR SHARE $

1:i=:onr.) /I (1F:r /IRTMF:IIT OF Tll/ltlSPOllT /IT ION

STATE TRAHSPORTATIOH IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

-- ----- P, I ,NO.

PROJECT DATA

COMMENTS

P-U-T-N-A-M----S-R--2-4--A-T--"-A-S-H-I-N-G-T-O-N---A-V-EN--U-E--IN---E-A-TO--N-TO--N------------------------------

222450 SIGNALS/ TRAFFIC

CONG DIST. 11

PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PUTNAM 241970

(.
SR 24/MILLEDGEVILLE RD@ CR 72/CR 217 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : 4.7 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER! D, GRIFFITH

CONG DIST, 11
FUND SOURCE: RWY, SAFETY FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 274

FISCAL

COST

----YEAR

ESH

PE 1994

---------

,$

7

ltOW NONE $

0

CONST 1994 $ 229

FED SHARE$ 229

GA. SHARE$

OTR SHARE$

PE 1992 ROW LOCL CONST

UNDERWAY AFTER H

: .

:,

'r



fflB!

~

. ~
1

~.,

~~

~~

~

-"41.~

~

~

~

l,!~i~f~~

j::!ew;,;,r,;

.~, ..

GEORGIA DEPARTHF.NT OF TIU\NSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 275

------- COUNTY

DESCRIPTION

P.I.NO.

PROJECT DATA

O--U-IT-H-A-N---C-O-U-N--TY---O-P-E-R-ATED PUBLIC TRANSIT

FISCAL

COST

SERVICE----------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

481268 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 2

FUNDS RECIPIENT: QUITMAN MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

OPERATING 1994 $

23

FED SHARE$

14

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

9

OUITHAN 481269

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: QUITMAN MANAGER: STEVE .KISH

CONG DIST. 2

OPERATING 1995 $

24

FUND SOURCE: RURAL TRANSIT

FED SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

10

QUITMAN 481270

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: QUITMAN MANAGER! STEVE KISH

CONG DIST. 2

OPERATING 1996 $

25

FUND SOURCE: RURAL TRANSIT

FED SHARE$

15

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

10

OUITHAN 4C2268

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: QUITMAN MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1994

$

31

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

OUITHAN 431070

SR 39@ BUSTAHATCHEE CREEK 7 MI NORTH OF GEORGETOWN

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .25

.

MANAGER: J, LINDSEY

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY ROW 1994 UNDERWAY CONST 1994 $ 601
FED SHARE $ - 481 GA. SHARE $ 120
0TH SHARE $

QUITMAN 431290

SR 27/SR 39: OVER TOBANNEE CREEK NORTH OF GEORGETOWN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES, PROJECT MILEAGE : .OO MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW
CONST

$

10

AFTER 96

AFTER 96

r.r.nr,1~1 I\ flF:PI\RTMF:IIT OF' Tl'\1\11~1'01'\TATIOr~
STI\TE TRANSPORTI\TION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

I6-Sep-1993 Page 276

COUNTY

DESCRIPTION

FISCAL

COST

--P.1.NO.

PROJECT DATA

COMMENTS

YEAR

BSTS

IU.BU.N-----C-O-U-N-T-Y--O-P-E-R-A-T-E-D--P-U--B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E--------------------------------------------------------------------------~. ~-------

181038 TRANSIT FACILITIES / OPERATIONS

CONG DIS.T. 9

FUNDS RECIPIENT: RABUN MANAGER: STEVE KISH

OPERATING 1994 $

17

FUND SOURCE: RURAL TRANSIT

FED SHARB $

10

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

7

RABUN 181039

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RABUN HMIAO!R: STEVE KISH

CONG DIST. 9

OPERATIN0.1995 $

17

FUND SOURCE: RURAL TRANSIT

FED SHARE$

10

FEDER.AL TRANSIT ADHIN FUNDS

GA. SRARB $

0TH SHARE$

7

RABUN lBlOtO

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: RABUN MANAGER: STEVE KISH

CONG DIST, 9

OPERATING 1996 $

18

FUND SOURCE: RURAL TRANSIT

FED SHARE$

10

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

8

RABUN 1C20l8

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT! RABUN MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1994

$

31

FUND SOURCE! RURAL TRANSIT

FED SHARE$

25

F~DERAL TRANSIT ADHIN FUNDS

GA, SHARE$

3

0TH SHARE$

3

RABUN 121950

SR.2 ACROSS DAVIS GAP/EB HP 11.24-12,66rWB HP 12.14~13.56 ADDITION OF A PASSING LANE. PROJECT MILEAGE: 2.32 MANAGER: L, OWENS

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ONDERWAY

ROW 1994 $

59

CONST 1995 $. 1076

FED SHARE $ . 861

GA. SHARE $ 215

0TH SHARE $

RABUN 171040

TALLULAH GORGE TRAILS/LANDSCAPING ALONG OLD 441 'OLD RR BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT.MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST, 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS

PE-LOCL

ROW 1994 $

16

CONST 1994 $ 708

FED SHARE$ 566

GA. SHARE$

3

0TH SHARE$ 145

..

.,

:i

~

.. ~ --~

~

-~

~

!!5.11

~
'lf~

-=

~

-=~.

~

~

,\..~~;.~

.i\

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 277

COUNTY

DESCRIPTION

FISCAL

. COST

P,I,NO.

PROJECT DATA

COMMENTS

YE.All

ESTS

RI-C-H-M-O-N-D--C-O-U-N-T-Y--O--PE-R-A-T-E-D---P-U-B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------

281169 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 10 C 11

FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH

OPERATING 1994 $

65

FUND SOURCE: RURAL TRANSIT

FED SHARE$

37

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

OTR SHARE$

27

RICHMOND COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1169 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: RICHMOND
MANAGER: STEVE KISH

CONG DIST. 10 C 11

OPERATING 1995 $

69

FUND SOURCE: RURAL TRANSIT

FED SHARE$

39

FEDERAL TRANSIT AOMIN FUNDS

GA, SHARE$

0TH SHARE$

29

RICHMOND COUNTY OPERATED PUBLIC TRANSIT SERVICE 281170 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH
'
RICHMOND TWO STANDARD VANS AND TWO MOBILE RADIOS 2C2169 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH
RICHMOND ONE CONVERSION VAN WITH LIFT ANO ONE MOBILE RADIO 2C2169 TRANSIT FACILITIES/ CAPITAL
FUNDS-RECIPIENT: RICHMOND MANAGER: STEVE KISH

CONG DIST, 10 C 11

OPERATING 1996 $

71

FUND SOURCE: RURAL TRANSIT

FED SHARE$

40

FEDERAL TRANSIT AOMIN FUNDS

GA, SH.ARE$

0TH SHARE$

30

CONG DIST, 10 C 11

CAPITAL 1994

$

42

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$ GA. SHARE$ 0TH SHARE$

34

CONG DIST. 10 C 11

CAPITAL 1995

$

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

OTH.SHARE $

3

. RICHMOND ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO 2C2170 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH

CONG DIST, 10 C 11

CAPITAL 1996

$

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHAAE $

4

0TH SHARE$

3

RICHMOND BUS VACUUM, COMPUTERS, UPGRADE FAAEBOX EQUIPMENT, 4 VANS
202010 TRANSIT PROJECTS/ CAPITAL FUNDS RJl!CIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 10 C 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1994

$ 245

FED SHARE$ 196

GA. SHARE$

25

0TH SHARE$

25

r.F:oR:JI\ PF.rl\PTHF.IIT OF TP.l\tlSrORTI\Tl()fl
STATE TRJI.NSPORTI\TION lHPROVEHENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 279

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

Y~

. ESTS

R-I-C-H-M-O-N-D--P-U-R-C-H-A--SE---5-T-R--A-N-S-IT---V-E-H-I-C-L-E-S-----------------------------------------------------------------------------------------------

202011

TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER! STEVE KISH

CONG DIST. 10, 11

CAPITAL 1995

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

950 760
95

0TH SHARE$

95

RICHMOND PURCHASE 3 TRANSIT VEHICLES AND ONE AUTOMOBILE 202012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE.KISH

CONG DIST, 10, 11 -,
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$ 822

FED SHARI:$ 658

GA. SHARE$

82

0TH SHARE$

82

RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA ANO RICHMOND COUNTY 202013 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10, 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $ FED SHARI:$ GA. SHARE$ 0TH SHARE$

1747 786
3 9U

RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA ANO RICHMOND COUNTY 20201 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM
MANAGER! STEVE KISH

CONG DIST. 10, 11
FUND SOURCE-: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ FED SHARI:$ GA. SHARE$ 0TH SHARE$

1852
778
6 1069

RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND RICHMOND COUNTY 202015 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10, 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996 $ FED SHARE$ GA. SHAU$ 0TH SHARE$

1963 785
2
1190

RICHMOND ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

. 2V1019 TRANSIT PROJECTS/ CAPITAL

FUNDS RECIPIENT: AGENCIES IN AUGUSTA MPO AREA

MANAGER: STEVE RISH

.

CONG DIST. 10, 11

CAPITAL 1994

$ u

FUND SOURCE: ELDERLY' DISABLED FUND FED SHARE$

39

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

0TH SHARE$

5

RICHMOND ELDERLY ANO DISABLED VEHICLES ANO EQUIPMENT 2Vl020 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA HPO AREA MANAGER: STEVE RISH

CONG DIST. 10, 11

CAPITAL 1995

$

50

FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$

40

FEDERAL TRANsiT ADHIN FUNDS

GA. SHARE$

5

0TH SHARE$

5

., Cl

, .

., ..

-.~, = = -~ ~ ~

~
"

~

~r@

I'."~=

==

~

~~(L.(:L!..j
f'

~

~,
~

-~~~i

j.-- ~- \\:

.-,'"



GEORGIA OF.PARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 279

COUNTr

OESCRIPTION

FISCAL.

COST

P,I.NO.

PROJECT OATA

COMMENTS

YE.AR

ESTS

R-I-C-H-M-O-N-D--E-L-D-E-R-L-Y---A-NO---D-IS-A-B-L-E-D---V-E-H-I-C-L-E-S--A-N-O--E-O-U-I-P-H-E-N-T-------------------------------------------------------------------------------

2Vl021 TRANSIT PROJECTS/ CAPITAL

CONG DIST, 10 C 11

FUNDS RECIPIENT: AGENCIES IN AUGUSTA HPO .AREA MANAGER: STEVE RISH

CAPITAL 1996

$

52

FUND SOURCE: ELDERLY C DISABLED tUND FED SR.ARE$

42

FEDERAL TRANSIT ADMIN FUNDS

GA, SR.ARE$

5

OTR SHARES

5

RICHHONO I-520 FM 1-20 TO SR 56SP INCL SHOULDER WORR FM SR 4 TO 56SP

AUGUSTA TIP f RC-520

"210360 RIDING SURFACE REHABILITATION, SURFACE, GRIND, SEAL, STRIPE ET.C.CONG DIST. 10 , 11

PROJECT MILEAGE : 9.30 - EXIST. LANES: 4 /PROPOSED LANES: 4

MANAGER: IC FULBRIGHT

FUND SOURCE: I-STATE HAINT.

FEDERAL HIGHWAY AOMIN FUNDS

210430 IS AN ASSOCIATED PROJECT,

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 5546

FED SHARE$ 4991

GA. SHARE $ 555

0TH SHARES

RICHMOND 1-520 FM tmlGHTSBORO RO TO GORDON HWY 210430 RECONSTRUCTION C WIDENING FROH 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.37 MANAGER: IC FULBRIGHT

AUGUSTA TIP f RC-520
CONG DIST. 10
FUND SOURCE: NAT'L,RIGHWAY FEDERAL HIGHWAY AOMIN FUNDS 210360 IS AN ASSOCIATED PROJECT.

PE 1994 UNDERWAY
ROW 1994 $ 414 CONST 1995 $ 2053
FED SH.ARE$ 1642 GA. SHARE$ 411 0TH SHARE$

RICHMOND I-520 FM WHEELER RD TO WRIGHTSBORO RD 210440 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES,
PROJECT MILEAGE: 1.32 MANAGER: IC FULBRIGHT

.AUGUSTA TIP f RC-520
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS

PE 1994 UNDERWAY

ROW 1994 $ 416

CONST 1995

$ 2042

FED SHARE$ 1634

GA, SR.ARE$ 409

0TH SHARE$

RICHMOND 1-520 FM WHEELER RD NORTH TO I-20 210450 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : ,76 MANAGER: IC FULBRIGHT

AUGUSTA TIP f RC-520
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY F.EDERAL HIGHWAY AOHIN FUNDS

PE 1994 ROW 1996 CONST

UNDERWAY
$ 1000 AFTER 96

RICHMOND I-20@ WHEELER RO/ALSO COLUMBIA CO. 210490 INTERCHANGE/ NEW CONSTRUCTION
PROJECT MILEAGE : .27 - EXIST. LANES: 4 /PROPOSED LANES: 6 MANAGER: NEIL DAVIS
RICHMOND BOBBY JONES XWY FM LANEY WALKER BLVD TO SAVANNAH RIVER 220105 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : .. 89 MANAGER: D. SMITH

AUGUSTA TIP f Rc-cc-20 CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS 250430 IS AN ASSOCIATED PROJECT.
AUGUSTA TIP f RC-117 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 8730
FED SHARE $ 6994 GA. SHARE $ 1746 0TH SHARE $

PE NONE ROW 1991 CONST

$

0

UNDERWAY

AFTER 96

r,r,np,; I I\ [lf:P /\l'TMF.IIT or TP.MISPOl'T/\TION
ST/\TE TRAflSPORT/\TION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 280

COUNTY

DESCRIPTION

FISCAL

COST

p, I ,NO,

PROJECT DATA

.

COMMENTS

YEAR

ESTS

RICHMOND SR 4/15TH ST/-A-U-G-U-S-T-A---FM---M-I-L-L-E-D-G-E-V-I-L-L-E--R-D--T-O--G-O-V-E-R-N-M-E-N-T--S-T---------A-U-G-U-S-T-A--T-I-P--I--R-C---0-3-9--------------------PE---1-9-9-2-.---U-N-D-ER-WAY

220680 RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST, 11

ROW 1994 $ 735

PROJ!CT MILEAGE: ,87

CONST 1996 $ 1912

MANAGER: BILL MOSKAL

FUND SOURCE: SURFACE TRANSPORT,

FED SHARE$ 1530

FEDERAL HIGHWAY ADHIN FUNDS

GA, SHARE$ 382

0TH SHARE$

RICHMOND SR 56 FM SR 23 TO SR 56 SP:NEW LOC TO SR 56:TO BENNOCH HILL 221190 RECONSTRUCTION C WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: 6.20 MANAGER: RAY METTS

AUGUSTA TIP I RC-038
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 221185 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1992 CONST

UNDERWAY UNDERWAY AFTER 96

RICHMOND SR 56@ MCBEAN CREER/ALSO BURRE CO 221185 REHAB, OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE: ,04 MANAGER: RAY METTS

CONG DIST, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221180 IS AN ASSOCIATED PROJECT.

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

RICHMOND TOBACCO RD FM SR 4/US 1 TO WINDSOR SPRING RD 221440 RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 2.46 MANAGER: D, GRIFFITH

RICHMOND SR 56 SP/NEW SAVANNAH RD FH I-520 N TO US 79/GORDON HWY 221470 RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.12 MANAGER: D, CHURCH

RICHMOND SR 10/GORDON HWY FM SR 223 TOW/FORT GORDON GATE fl/CCLVT 221532 RECONSTRUCTION C WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.50 MANAGER: BILL MOSKAL (C)

RICHMOND SR 4/0EANS BR RO.FM S FT GORDON GATE 5 TO HP 20.75 221550 TURN LANES/ RECST. OR REHAB.
PROJECT MILEAGE: 6.70 - EXIST. LANES: 4 /PROPOSED LANES: 4

MANAGER: D. GRIFFITH

1.

AUGUSTA TIP I RC-207 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
AUGUSTA TIP I RC-207
CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 250340 IS AN ASSOCIATED PROJECT.
AUGUSTA TIP I GH. 025
CONG DIST. 10
FUND SOURCE: suRFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
AUGUSTA TIP I RC-043
CONG DIST. 11 , 10 GRIP-PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 3353 FED SHARE$ 2682 GA, SHARE$ 671 OTR SHARE$

PE 1992 UNDERWAY ROW LOCL CONST 1994 $ 3999
FED SHARE$ 3199 GA. SHARE$ 800 0TH SHARE$

PE 1993 UNDERWAY
ROW 1994 $ 346 CONST 1995 $ 4271
FED SHARE$ 3417 GA, SRA.RE$ 854
0TH SRA.RE$

PE 1994 UNDERWAY

ROW 1994 $

45

CONST 1995 $ 1150

FED SHARE$ 920

GA, SHARE$ 230

0TH SHARE$

. ,, .

, .

... r~

~

~

--~ = = = ~ I

:p!~

~

~

~

~ !!fi';ir,a

~
"

~:i-;:;i~l

f;ir~i.~~

,'l(.l<".~"4

1';"~

f .... : ,.i

..

COUNTY ,.1.No.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

RICHMOND SR 415@ UTILITY; ROCKY: PHINIZYt BEAVER: LOVERS: CSX: MARY 221580 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .08 MANAGER: O. SMITH

AUGUSTA TIP f RC-117 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS 221588 IS AN ASSOCIATED PROJECT.

16-Sep-1993 Page 281

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1996 $ 6849

FED SllARE $ 5479

GA. SllARE $ 1370

0TH SHARE $

RICHMOND SR 415 fM NEW SAVANNAH RD TO LANEY WJ\.LKER/INCL TIE TO SR 28 221588 CONSTRUCTION or NEH ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 5.15 MANAGER: O. SMITH

AUGUSTA TIP f RC-117 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS 221580 IS AN ASSOCIATED PROJECT.

PE 1991 UNDERWAY

ROW NONE $

0

CONST 1996 $ 7600

FED SHARE $ 6080

GA. SHARE $ 1520

OTR SHARE $

RICHMOND SR 28/FURYS FERRY RO FM RIVERHATCH PK TO CR 98/SEE COLUMBIA
22186X UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CHURCH

AUGUSTA TIP f RC-CC-048 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 221860 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1996
CONST

UNDERWAY

$

0

AFTER 96

RICHMOND 1-520/SR 415 @ SR 56 ADD "8 LOOP 222350 RAMP/ NEW CONSTRUCTION
PROJECT MILEAGE: .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: O. CHURCH

AUGUSTA TIP f RC-520 CONG DIST. 10, 11
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1993
ROW 1995 CONST

UNDERWAY
$ 1000 AFTER 96

RICHMOND SR 4/US 1@ TOBACCO RO IN AUGUSTA 222370 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE: .50 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: O. CHURCH (M)

AUGUSTA TIP f RC-043
CONG DIST. 10, 11 GRIP PROJECT
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS

PE 1994 ROff 1996
CONST

$ 200

$

25

AFTER 96

RICHMOND GREENE STREET FM 12TH STREET TO 4TH STREET IN AUGUSTA 222430 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : 1.36 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
RICHMOND SR 88 FM W/CR 65/HEPHZIBAH E TO SR 121/US 25 231000 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.30 MANAGER: D. GRIFFITH

AUGUSTA TIP f RC-048 CONG DIST. 11 FUND SOURCE: RWY. SAFETY FEDERJ\L RIGRWAY.AOMIN FUNDS
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1994 $

17

ROW 1995 $

10

CONST 1996 $ 578

FED SHARE$ 520

GA. SHARE$

58

0TH SHARE$

PE 1992 UNDERWAY
ROW 1992 UNDERWAY CONST 1994 $ 2007
FED SHARE $ 1606 GA. SHARE $ 401
0TH SHARE $

r.tonr.111 tJF:PI\RTMF:IIT or TRl\!ISP0RTI\TI0N STATE: TRANSP0RTI\TI0N IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 282

COUNTY
P, I.NO,

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL YEAR

COST ESTS

RICHMOND CSX RAILROAD AT OLIVE RD IN AUGUSTA

AUGUSTA TIP f RC-9104

---------P-E---1-9-9-1 .---U-N-D-E-R-W--AY

240809 BRIDGES/ TRAFFIC

CONG DIST, 11 C 10

ROW LOCL

PROJECT MILEAGE: ,47 MANAGER! D. CHURCH

CONST 1996 $

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

24Y809 IS AN ASSOCIATED PROJECT.

0TH SRARE $

3219 2575
644

RICHMOND SHOWN FOR RR DEMO" HONEY ONLY .. SEE 240809 FOR PROJECT INFO
24Y809 UNKNOWN/ TRAFFIC PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: D, CHURCH

AUGUSTA TIP I RC-9104
CONG DIST. 11 C 10
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 240809 IS AN ASSOCIATED PROJECT.

PE 1991 UNDERWAY ROW LOCL CONST 1996 $ 2306
FED SHARE$ 2191 GA. SHARE$ 115 0TH SHARE$

RICHMOND BELAIR RD EXT FH FT GORDON GATE 1 TO BELAIR RD/I-20/COLUMBIA 250320 CONSTRUCTION OF NEW ROUTE WITR 4 LANES PROPOSED.
PROJECT MILEAGE:. 3.28 MANAGERt D. CHURCH

AUGUSTA TIP I RC-CC-207 CONG DIST, 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY RON 1993 UNDERWAY CONST 1994 $ 1U82
FED ~HARE.$ 13186 GA. SHARE $ 3296 0TH SHARE$

RICHMOND SR 56 SPUR/NEW SAVANNAH RD@ ROCRY CREER 250340 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE: .30 MANAGER! D, CHURCH

AUGUSTA TIP I RC-207 CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 221470 IS AN ASSOCIATED PROJECT.

PE 1986 UNDERWAY

ROW 1987 UNDERWAf

CONST 1994 $ 407

FED SRARE $ 326

GA. SHARE$

81

0TH SHARE$

RICHMOND WINDSOR SPRINGS RD FM RICHMOND HILL RD TO B JONES XWAY 250370 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .53 MANAGER: O. SMITH

AUGUSTA TIP I RC-7007 CONG DIST. 11
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY RON LOCL CONST 1994 $ 1370
FED SHARE$ 1028 GA. SRARE $ 343 0TH SHARE$

RICHMOND WINDSOR SPRINGS RO FM HEAOOWBROORS OR TO RICHMOND RILL RO 250372 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE :. 1. 06 MANAGER: D. SMITH

AUGUSTA TIP I RC-7007 CONG DIST. 11, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHtfAY ADMIN FUNDS

PE 1992 UNDERWAY ROtf LOCL CONST 1994 $ 2226
FED SHARE$ 1781 GA. SHARE$ 445 0TH SHARE$

RICHMOND WINDSOR SPRINGS RO FM TOBACCO RO TO MEAOOWBROOR OR 250374 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1,82 MANAGER: D. SMITH

AUGUSTA TIP I RC-7007 CONG DIST. 11
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY ADMIN FUNDS 25Y374 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY ROW LOCL CONST 1994 $ 2287
FED SHARE$ 1715 GA. SHARE $ 572
0TH SHARE$

'1. "



't

H

~

~..!El

. ' == .~

~
"

:~

!!fM

-m:.=

l\W~!lJ

w:.::~1~

lf.:l'IPn:<.

=~~

~~

I.. :: .:~t

.' ..

GEORGIA DEPARTMENT OF TRJ\l'ISPORTATION STATE TRANSPORTATION IHPROVEHENTS PROGRAM PROJECT LISTING BY fOUNTY FY 1994/FY 1996

16-Sep-1993 Page 283

C011NTY

DESCRIPTION

FISCAL . COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

RICHMOND CR 65/WINDSOR SPRINGS RO@--B-U--T-LE-R---C-R-EE-K--------------------.--------A-U-G-U-S-T-A--T-I-P--f--R-C---7-0-0-7-------------------P-E--1-9-9-2-----U-N-DE-R-WAY

250375 REPLACEMENT OF THE EXISTING BRIDGES(S). FROH 2 TO 4 LANES.

CONG DIST. 11, 10

ROW LOCL

PROJECT MILEAGE : .02

CONST 1994

$

556

MANAGER: D. SMITH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

445

FEDERAL HIGHWAY AOHIN FUNDS 250374 IS AN ASSOCIATED PROJECT.

GA. SHARE$

111

0TH SRARE $

RICHMOND WHEELER RD/CR 601 FH I-20 TO MEDICAL CENTER DRIVE 250430 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .91 MANAGER: NEIL DAVIS

AUGUSTA TIP f RC-CC-7011 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS 210490 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$ 2066

FED SHARE$ 1653

GA. SHARE$

413

0TH SHARE$

RICHMOND CR 200/WHEELESS RD@ ROCKY CREEK JUSTS/MILLEDGEVILLE RD 250490 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .15 MANAGER: D. GRIFFITH

AUGUSTA TIP f RC-7000 CONG DIST. 11, 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOHIN FUNDS

PE 1994
ROW LOCL CONST

$

39

AFTER 96

RICHMOND 15TH ST@ CSX M NEAR GREENE ST IN AUGUSTA 250500 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .OO MANAGER: D. CHURCH (H)

AUGUSTA TIP f RC-0048 CONG DIST. 11
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY AOHIN FUNDS

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

RICHMOND WALTON WAY INTERSECTION IMPROVEMENTS WITH 13TH ST/AUGUSTA 250550 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE: .15 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D. GRIFFITH
RICHMOND WINDSOR SPGS RD FRM TOBACCO RD TO MEADOWBROOK DR (SPLIT FUND 25YJ74 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.82 MANAGER:
RICHMOND PEDESTRIAN OVERPASS' Ht.NDICAP RAMP AT AUGUSTA RIVERWALK 270890 BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

AUGUSTA TIP f RC-7027 CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOHIN FUNDS
AUGUSTA TIP I GR 01
CON.G DIST. _11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS 250374 IS AN ASSOCIATED PROJECT.
AUGUSTA TIP I RC-OOOE
CONG DIST. 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL
CONST 1994 $ uo

FED SHARE$ 126

GA. SHARE$

u

0TH SHARE$

PE 1992 UNDERWAY

RO" NONE $

0

CONST 1994 $ 2320

FED SHARE $ 1856

GA. SHARE $

464

0TH SHARE $

PE 1994 $

20

ROW LOCL

CONST 1994

$

300

FED SHARE$ 240

GA. SHARE$

0TH SHARE$

60

r.F.ClP<;JJ\ l>F.P/111TMF.tlT OF TRI\IISPUPTJ\TION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

---- ---- P,I.NO.

PROJECT DATA

R-I-C-H-M-O-N-D--C-R--3-6-1-/-D-A-N---BO-W--L-E-S--R-O-A-D-@---N-O-R-F-O-L-K--S-O-U-T-H-E-R-N--R-A-JL-R-O-A-D---.-1732965F

--- COMMENTS

270930 M XINO / TRAFFIC

CONO DIST. 10

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES1 0

, I



MANAGER:_ W HESTER

FUND SOURCE: HWY. SAFETY

FEDERAL HIGHWAY ADMIN FUNDS

RICHMOND CR 997/PERKJNS ROAD AT NORFOLK SOUTHERN RAILROAD,.l732968B 2709t0 RR XINO / TRAFFIC
PRO.nCT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER

CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOHIN FUNDS

16-Sep-1993 Page 284

FISCAL

COST

YEAR

ESTS

PE -N--ONE -----$ ------0

ROW N0NE $

0

CONST~l994 $

73

FED SHARE$

66

GA, SHARE$

7

0TH SHARE$

PE NONE $

0

ROW NONE $

.0

CONST 199'4 $

72

FED SHARE$

65

GA. SHARE$

7

OT.ff SHARE $

. i

,.
' '1

... f;
'&

~

~

. ~- == ,. .~- "" ~ ~ =

= =

== . ~-- i,;~n0:,s !f!l~rel er.j~;~ ~!O!Ji;:f~ ~-~~~ \~--:.':;I: r.-.--:-. '

..

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 285

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL . COST

YEAR.:

ESTS

ROCKDALE ELDERLY AND DISABLED VEHICLES ANO EQUIPMENT

------ - ----------------------------

7Vl034 TRANSIT PROJECTS/ CAPITIU.

CONG DIST, 4

FUNDS RECIPIENT: AGENCIES IN ROC!tDALE COUNTY MANAGER: STEVE KISH

CAPITAL 1994

$

9

FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$

7

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SRAAE $

1

ROCiDALE ELDERLY ANO DISABLED VEHICLES AND EQUIPMENT 7Vl035 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN ROCKDALE COUNTY MANAGER: STEVE KISH

CONG DIST, 4

CAPITAL 1995

$

10

FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

ROCKDALE ELDERLY ANO DISABLED VEHICLES ANO EQUIPMENT

7Vl036 TRANSIT PROJECTS/ CAPITIU.

FUNDS RECIPIENT: AGENCIES IN ROCKDALE COUNTY

I.

MANAGER: STEVE KISH

CONG DIST, 4

CAPITAL 1996

$

10

FUND SOURCE: ELDERLY, DISABLED FUND FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHAAE $

1

ROCKDALE SALEH RD FH FLAT SHOALS TO N/RR(INCL BR@ I-20;RECST INTCH) 712090 RECONSTRUCTION, WIDENING FROM 2 LANES TO 6 LANES.
PROJECT MILEAGE: ,60 MANAGER: BILL MOSKAL

ATLANTA TIP IR 1 CONG DIST. 4
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1986

UNDERWAY

ROW 1991 UNDERWAY

CONST 1994

$ 9352

FED SHARE.$ 8417

GA. SHARE$ 935

OTR SHARE$

ROCKDALE I-20/CONYERS@ WEST AVE 712240 INTERCHANGE/ RECST, OR REHM.
PROJECT MILEAGE: .73 - EXIST. LANES: 3 /PROPOSED LANES: 5 MANAGER: BILL MOSICAL
ROCKDIU.E PARKER RD FM CULPEPPER TO DARLAND@ MALCOLM INCL BR OVER I20 712640 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: ,72 MANAGER: BILL MOSKAL

ATLANTA TIP IR 19 CONG DIST. 4
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I RO 15
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 71Y640 IS AN ASSOCIATED PROJECT.

PE 1986 UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$ 2423

FED SHARE $ 2181

GA. SHARE $ 242

0TH SHARE $

PE LOCL

ROiif 1995

$ .

CONST 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

3410 4866 3893
973

ROCKDIU.E PARKER RD FH CULPEPPER TO OAKLAND@ MALCOLM/BR @I-20 712640 71Y640 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : ,00 MANAGER:

ATLANTA TIP I RO 15
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 7126.40 IS AN ASSOCIATED PROJECT.

PE LOCL

ROW NONE

$

CONST 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 1979 1583
396

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

r.r.np,~ I" rir.rl\PTHF:IIT OF TIU\tlSr()RTI\T J()N STI\TF.: TR/\NSrORTATION JMPROVF.:HENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

~OC~DALE SR 138 FM RELOC SR138@ SR 20 TO 1-20 121580 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJ!:CT MILEAGE : 1.26 MANAGER! D. CHURCH

ATLANTA TIP I RO 35
CONG DIST. 4
FUND SOURCE: SURFACE-TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 286 .

FISCAL

COST

YEAR

ESTS

-.P-E--1--9-9-3---U-N-D-E-R-W--AY

ROW 1996 $ 2390

CONST

AFTER 96

~OC~DALE SR 20 FH SOUTH OF HONEY CREE~ RO TO RELOCATED SR 138 130903 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.88 MANAGER! D. CHURCH (HI

ATLANTA TIP I RO 18
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AFTER 96 AFTER 96

~OC~DALE EXTEND BR CLVT ON SR 20@ ALMOND BR.A.NCR 130905 REHAB. OF THE EXISTING BRIOGE(S). FROH 2 LANES TO 4 LANES.
PROJECT MILEAGE: .01 MANAGER: D, CHURCH (M)

ATLANTA TIP I RO 44
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1991 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

ROC~DALE SR 20 FH SR 212 IN NEWTON CO NORTH TO RONEY CREE~ RD/CR 23 730907 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.50 MANAGER: 0. CHURCH. (HI

ATLANTA TIP I RO 28
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL ~IGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

ROC~OALE SR 20@ BIG HAYNES CREE~ NEAR WALTON CO LINE 730950 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE: ,20 MANAGER: D. GODWIN

ATLANTA TIP I RO 42
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1995 ROW CONST

$

52

AFTER 96

AFTER 96

ROC~OALE SR 138 FROM SIGMAN RO/SR 20 TO DENNARD RO 731040 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 2.75 . MANAGER: D. CHURCH
ROC~OALE SR 138@ YELLOW RIVER 731045 REHAB. OF THE EXISTING BRIOGE(SI. FROM 2 LANES_ TO 5 LANES.
PROJECT MILEAGE : .02 MANAGER: D. CHURCH

ATLANTA TIP I RO 13
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 731045 IS AN ASSOCIATED PROJECT.
ATLANTA TIP I RO 46
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 731040 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY
ROW 1994 $ 1933 CONST 1995 $ 5815
FED SHARE $ 4652 GA. SHARE $ 1163
0TH SHARE $

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 . $ 722

FED SHARE$ 578

GA. SHARE$ 144

0TH SHARE$

4. If

..

.,, ...

~

~

~

~

~

~ .r~:~Yl

= ~

~

f;J?,!)!.;\i

i!.'f!f!!((!'.t

.I~~;~

~

~ :: '.. .;..

. . . ,

ti I~

"

GEORGIA DEPJ\RTHENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 287

COUNTY

DESCRIPTION

FISCAL

COST

P,1.NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

RO-C-I-U->-A-LE--S-R---1-3-9-/S-R---2-0--FR-O-M---N-O-R-TH---O-F--I---2-0--T-O--S-IG-M--A-N--R-O-A-D--------------------A-T-L-A-N-T-A--T-I-P--I--R-O--1-3---------------------p-g--N-O-N-E-----$------O

731047 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.

CONG DIST, 4

ROW 1994 $ 5789

PROJECT MILEAGE : 1. 70

CONST 1995 $ 4048

MANAGER: UNKNOWN

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$ 3238

FEDERAL HIGHWAY ADMIN FUNDS

GA, SHARE$ 810

0TH SHARE$

ROCIU>ALE SR 138/SR 20 BRIDGE OVER I-20 731048 BRIDGES/ RECST, OR REHAB.
PROJECT MILEAGE : ,27 MANAGER: UNKNOWN

ATLANTA TIP I RO 13
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $ GA. SHARE$ 0TH SHARE$

0
0
3126 2501
625

ROCKDALE OLD COVINGTON HWY@ ROCKDALE INDUST. BLVD, FARMER ROAD
742510 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .20 - EXIST, LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN

ATLANTA TIP I RO 31
CONG DIST. 4
FUND SOURCE:. HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1995 $ 205

FED SHARE$ 185

GA. SHARE $

21

0TH SHARE$

ROCKDALE SR 20@ PLEASANT RILL ROAD 742810 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE: .57 - EXIST. LANES: 2 /PROPOSED LANl!:9: 2 MANAGER: D, GODWIN

ATLANTA TIP I RO 36
CONG DIST. 4
FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994 $ 401

FED SHARE$ 361

GA. SHARE$

40

0TH SKARE$

ROCIU>ALE SIGMAN RO FM I-20 NORTH TO SR 20/138 (EAST LEG) 752210 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE: 2,50 MANAGER: D. CHURCH (M)

ATLANTA TIP I RO 30
CONG DIST, 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

20

AFTER 96

ROCKDALE OLD COVINGTON HWY FM GREEN ST TO SR 138/20 752270 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : ,00 MANAGER: D. CHURCH (M)

ATLANTA TIP f RO 34 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

10

AFTER 96

ROCKDALE FLAT SHOALS ROAD@ OLD SALEH ROAD

752280

INTERSECTION IMPROVEMENT/ TRAFFIC

PROJECT MILEAGE : .20 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: D. GODWIN

f

ATLANTA TIP I RO 25
CONG DIST. 4
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994 $ 256

FED SHARE$ 230

GA. SHARE$

26

0TH SHARE$

COUNTY P.I.NO.

DESCIHPTION PROJECT DATA

l'";f.()PI~ I/\ or.r/\RTMEtlT ()f' TR/\IISrORT/\T ION ST/\TE TRJ\tlSPORT/\TlON IMPROVEMENTS PROGRJ\H PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

ROCKDALE JOHNSON RD/CR 56 AT EBENEZER RD 752350 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE: .20 - EXIST. LANES! 0 /PROPOSED LANES: 0 MANAGER:

ATLANTA TIP f RO 24 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

ROCltDALE SMYRNA RD/CR 438@ KLONDIKE RD/CR 57 752410 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE 1 .20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
r.
ROCKDALE ROCKBRIDGE RD/CR 74@ HAIN ST IN CONYERS 752420 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE I ,38 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

ATLANTA TfP f RO 17
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f RO 52 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

ROCKDALE FARMER RD/CR 439@ SIGMAN RD/CR 435 752440 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE I ,20 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER:

ATLANTA TIP f RO 30 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS

ROCKDALE SR 212 AT TUCKER HILL ROAD AND HONEY CREEK ROAD 752490 TURN LANES/ TRAFFIC
PROJECT MILEAGE: 7,00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:

ATLANTA TIP f R 40 CONG DIST. 4
FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADHIN FUNDS

16-SPp-1993 Page 288

FISCAL YEAR

COST ESTS

PE LOCL

ROW LOCL

CONST 1995 $ 205

FED SHARE$ 185

GA .SKARE $

95

0TH SHARE$ 115

PE LOCL
ROW LOCL
CONST 1995 $ 215 FED SHARE$ 194 GA. SHARE$ 104 0TH SHARE$ 125

PE LOCL ROW LOCL
CONST 1995 $ 408 FED SHARE$ 367 GA. SHARE$ 142 0TH SHARE$ 183

PE LOCL ROW LOCL
CONST 1995 $ 392 FED SHARE$ 353 GA. SHARE$ 173 0TH SHARE$ 212

PE 1994 $

10

ROW 1995 $

10

CONST 1996 $ 231

FED SHARE $: 208

GA. SHARE$

23

0TH SHARE$

,,
ti!

''!

M

~

~

tffil~ ~~ 4,=

t



:~

==:o

~J,@]l

ffilt'.).!!

~t:~,~$

L;.J..~r,~

l'W~?A<-!'.l

~~

j(,j~~;..:;"(i

\.:::::_;:,

,

~

GEORGIA DEPI\RTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 289

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL . COST

P,I.NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

-SC-H-L-E-Y----S-R---26--P-A--S-SI-N-G---L-A-N-E-S-@---4--L-O-C-A-T-IO--N--S-C-H--L-E-Y-,--M-A-C-O-N--C-O-U-N-T-I-E-S-------------------------------------------------P-E--1-9-9-2-----U-N-O-E-R-tfA-Y

321987 ADDITION OF A PASSING LANE.

CONG DIST. 2

ROW 1994 UNOERtfAY

PROJECT MILEAGE : 5.43

GRIP PROJECT

CONST 1995 $ 2222

MANAGER: GORDON BROWN

FUND SOURCE: SURFACE TRANSPORT,

FED SHARE $ 1778

FEDER.AL HIGHWAY ADHIN FUNDS

GA. SHARE $ 444

OTR SHARE $

l

r.r.nPr.t/\ llEP/\RTMF:IIT OF' TRANSrORT/\TION

16-Sep-1993

STATE TRANSPORT/\TlON IMPROVEMENTS PROGR/\H

Page 290

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

I2-C2P-U1-,I3-V,2-NE9-NO--, -SR-RE-P-L2-A1-C-E"-/M.S-EY-NL-TV-A-o-Nr-PI-RAT-HO@-EJE-C-OE-TXG-IE-SDE-TAC-ITNH-AG-E-I!-!B,-R-HI-OO-RG-S-EE-S-(CS-R)-E.-E-RF-RS-O-M--2--T-O--4--L-A-,N-E-S-.--------C-O-N-G--D-CI-OS-HT-H.-E-N1-1T-S-------------------------R-OP-WEY-l!-!N1A-O9R-N9-I2!!-----U$-NE-DS-ETR-SW--AY0

PROJl!CT MILEAGE : .03

GRIP PROJECT

CONST 1996 $ 1354

MANAGER:~ FULBRIGHT

FUND SOURCE: BRIDGE PROGRAM

Fl'!O SHARE$ 1093

FEDERAL HIGHWAY AOMIN FUNDS

GA. SHARE$ 271

OTR SHARE$

SCREVEN SR 17@ JAC~SON BRANCH
231100 Rl!!PLACl!!MENT or THE EXISTING BRIOGl!!S(Sl. NO ADDEO LANES.
PROJl!CT MILEAGE : .33 MANAGER: O. GRIFFITH

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNOl!!R"AY

CONST 1995 $ 339

FED SHARE$ 271

GA. SHARE$

69

0TH SRMZ $

., ,. \t'.

-1.

..,.

~

~

~ ,. ,.

5'~jfilj fl

ee

~,.1;g

I~

t!!~:~!~~

~,.,;~~

. . i;.-.:::-:.,:liji ~!.~!~

~-

~:>:i::i~

v:.-.:..:-<:

''

l.~

GF.ORGIA DEPAATMP.,,T OF' TIU\NSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 291

COUNTY

DESCRIPTION

FISCAL

COST

P.1.NO.

PROJECT DATA

SEMINOLE SR 253@ FISH POND DRAIN ti OF SR 39

------

COMMENTS

YEAR

ESTS

- --------------------------------------------------P-E--1-9-9-2-----U-N-DE-R-W--AY

.31080 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 2

ROW 1994 $

1

PROJECT MILEAGE : .75

CONST 1995 $ 500

MANAGER: J. LINDSEY

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE$ oo
GA. SHARE$ 100

0TH SHARE$

SEMINOLE CR 9/GATOR POND ROAD OVER FISHPOND DRAIN
uno REPLACEMENT OF THE EXISTING BRIDGES (S). NO ADDED LANES.
PROJECT MILEAGE : .50
MANAGER: J. LINDSEY (H)

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

5

ROW LOCL

CONST 1995 $. 201

FED SHARE$ 161

GA. SHARE$

o

0TH S ~ $

r.F.npr; I/\ PEr /\PTMF.NT ()f TIU\tlSrllRT/\T JOtl ST/\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 292

COUNTY

DESCRIPTION

P. I.NO.

PROJECT DATA

-----------------------------------------------------------
!PAI.DINO TAYLOR ST/GRIFFIN FH 16TH ST TO 10TH ST

FISCAL

COST

------------------C-O-M--M-E-N-T-S--------------------------P-EY-E-A1-R9-9-2-----U-NE-DS-ETR-SW--AY

321640 RECONSTRUCTION, WIDENING FROH 4 LANES TO 5 LANES,

CONG DIST. 3

ROW 1993 UNDERWAY

PROJECT MILEAGE: ,70

CONST 1995 $ 1203

MANAGER! J, GRAYBEAL

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 962

FEDERAL HIGHWAY ADHIN FUNDS

.

GA. SHARE$ 241

342480 IS AN ASSOCIATED PROJECT,

0TH SHARE$

SPALDING SR 92 FH W MORELAND RD/GRIFFIN TO US 41/INCL JACKSON RD REL 321820 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2,00 MANAGER: J. GRAYBEAL (C)

CONG oisT. 3
FUND SOURCE: SUP.FACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$ 3555

CONST 1995 $ 2226

FED SHARE $ 1781

GA, SHARE $

445

0TH SHARE $

SPALDING SR 155 NB HP 11,8/SPALDING-0,25/HENRYtSB HP 1.6-3.1/HENRY
331520 ADDITION or A PASSING LANE.
PROJECT MILEAGE : 2.90
MANAGER: GORDON BROWN(M)

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

15

AFTER 96

SPALDING SR 2 OVER UNNAMED CREER@ HP 5,1 NEAR EDWARDS RO
332050 REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDEO LANES,
PROJECT MILEAGE: ,00
MANAGER!

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY .ADHIN FUNDS

Pl!! 1994 ROW.1996 CONST

$

10

$

1

AFTER 96

SPALDING SIGNAL SR 16@ SR 92/GRIFFINt SR 92@ SOLOMON ST INTER IHPR
342480 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE: ,52 - EXIST. LANES: 5 /PROPOSED LANES: 5
MANAGER: J, GRAYBEAL

SPALDING SR 362@ CR 37/CARVER RD 342620 TURN LANES/ TRAFFIC
PROJECT MILEAGE : ,45 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: GORDON BROWN

SPALDING 342621

SR 3/US 19/GRIFFIN FM SR 92 N/CS RECONSTRUCTION, WIDENING FROM 4

804 N LANES

TON/CR 18 TO 6 LANES,

PROJECT MILEAGE : 1,52

MANAGER: J. GRAYBEAL (HI

CONG DIST. 3 FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADHIN FUNDS 321640 IS AN ASSOCIATED PROJECT.
CONG DIST. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 3 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS

Pl!! 1992 UNDERWAY

ROW LOCL

CONST 1995 $ 723

FED SHARI!! $ 651

GA. SHARI!!$

72

0TH SHARE$

Pl!! NONE $

0

ROW LOCL

CONST 1994 $ 152

FED SHARE$ 137

GA. SHARI!! $

15

OTH SHARE$

PE 1993 ROW 1995' CONST

UNDERWAY
$ 200 AFTER 96

..

(17

o::

"

C

1,, ....

~

~

~~
'

=te="

~~~~

~

~:.'!i~

Witt:rs

w:s;:r:

r::::.1~

~x.:;.,~

~~

f.-'i.':!iS,.'ij

l;,:i:;::



GEORGIA OEPMTHENT OF TRANSPORTATION

STATE TRANSPORTATION IHPROVEHENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P.I.NO.

PROJECT DATA

S-P-A-L-D-I-N-G--S-R--8-5--C-O-N-N--F-H---SR---1-6--(S-P-A--L-D-IN--G-)N---T-O--C-R--1-6-8--IN---B-R-O-O-~-S-/F-A-Y-l!-!T-T-I-!!------ -

- COMMENTS

32eox RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.

CONG DIST. 3

PROJECT MILEAGE : .00

MANAGER: UNIOIOWN

FUND SOURCI!!: SURFACI!! TRANSPORT.

FEDERAL HIGHWAY ADHIN FUNDS

342800 IS AN ASSOCIATl!!D PROJECT.

..

16-Sep-1993 Page 293

FISCAL Yl!!AR

COST ESTS

Pl!! 1994 ROW CONST

$

0

AFTER 96

AFTER 96

SPALDING CS 877/EXPERIMENT ST/GRIFFIN FH OLD ATLANTA RD TO US 41/SR 3
350710 Rl!!CONSTRUCTION, "IDENING FROM 2 ~ES TO 4 LANES. PROJECT MILEAGE: .35 MANAGER: J. GRAYBEAL

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

Pl!! 1992 ROW LOCL
CONST

UNDERWAY AFTER 96

SPALDING PASSINO LANES SR 16 BETWEEN GRIFFIN, NEtrnAN SEE COl'fl!!TA CO 36351X UNKNOWN/ UNIOIOWN
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 HANAGl!!R: GORDON BROWN
SPALDING RESTORE OPERA ROUSE, CREATE VISITORS Cl!!NTl!!R IN GRIFFIN 371230 MISCELLANEOUS IMPROVEHl!!NTS / l!!NRANCl!!Ml!!NT
PROJECT MILl!!AGI!!: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 HANAGl!!R:

CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 363510 IS AN ASSOCIATl!!D PROJECT.
CONG DIST. 3 FUND SOURCE: TRANS. ENHANCI!!. FEDERAL HIGHWAY AOMIN FUNDS

Pl!! NONI!! $

0

RO" 1990 UNOl!!RWAr:

CONST 1994 $

0

FED SHARI!! $

GA. SHARI!! $

0TH SHARE $

Pl!! LOCL

ROW 1994 $: 100

CONST 1996 $ 999

Fl!!D SHARE $ 799

GA. SHARI!! $,

49

0TH SHARE $1 249

r.F.0Rr.t~ ~EP~P.TMF.NT OF TIU\N~PORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM ~ROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 294

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO.

PROJECT DATA

COHHlNTS

YEAR

ESTS

S-T-E-P-H-E-N-S--S-R--1-7--8--O-G-G-S--B-R-A-N-C-H--------------------

.------------------------------------------------------------------------~--~------PE 1986 UNDERWAY

121360 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES,

CONG DIST, 9

ROW NONE

$

0

PROJECT MILEAGE : ;JO

GRIP PROJECT

CONST

AFTER 96

MANAGER: L. OWENS

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

STEPHENS CR lt6/RIVERDALE RD OVER WALTON CREER NE OF TOCCOA 170832 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE : ,10 MANAGER: L. OWENS
STEPHENS CR 16/YOW HILL ROAD 8 EASTANOLLEE CREER 1-,9 MIN OF AVALON 170833 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES,
PROJECT MILEAGE I .20 MANAGER: .
STEPHENS STREETSCAPE AND RENOVATE OLD DEPOT IN TOCCOA 171050 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER!

CONG DIST. 9 FUND SOURCE: BRIDGE _PROGRAM FEDERAL HIGHWAY ADHIN FUNDS.
CONG DIST, 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOHIN FUNDS
CONG DIST. 9 FUND SOURCE: TRruis. ENHANCE. FEDERAL HIGHWAY AOHIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONSi 1994 $ 35t

FED SHARE$ 283

GA, SHARE$

71

OTR SHARE$

PE 1994

$

7

ROW LOCL

CONST 1996

$

218

FED SHARE$ lH

GA. SHARE$

u

OTR SHARE$

PE LOCL

ROW NONE $

0

CONST 1996 $ 520

FED SR.ARE$ U6

GA, SHARE$

0TH SHARE$ 104

,
(C/

,, l".

~

~

~

~ (I

E'fffl

===

~el:~~~

~.t!JJ.:a

!f:}~

~,f.,{2'ftl

~(~!~_l,~!

~

~:.-~

I;,<.'.:;::.:::;.<

,

,r.,

GEORGIA OF.rMTMENT or TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 295

COUNTY

DESCRIPTION

FISCAL

COST

P. I. NO.

PROJECT DATA

COMMENTS

YEAR ' !STS

S-U-M-T-E-R----C-I-T-Y--O--PE-R-A-T-E-D---P-U-B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E--------------------------------------------------------------------------------------

38128 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 2

FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISR

OPERATING 1994 $

73

FUND SOURCE: RURAL TRANSIT

FED SHARE$

43

FEDERAL TRANSIT ADHIN FUNDS

GA. SRARE $

0TH SHARE$

30

SUMTER 3812.9

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISH

CONG DIST. 2 FUND SOURCE: RURAL TRANSIT

OPERATING 1995 $ FED SHARE$

.75

FEDERAL TRANSIT ADHIN FUNDS

GA, SHARE$

0TH SHARE$

31

SIJHTER 381250

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISH

CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

OPERATING 1996 $

79

FED SHARE$

u

GA. SHARE$

0TH SHARE$

32

SUMTER 3c228

ONE CONV. VAN/LIFT, 1 STAND. VAN, 2 RADIOS, 1 BASE STATION
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISH

CONG DIST, 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

CAPITAL 1994

$'

59

FED SHARE $- - 47

GA. SRARE $

6

0TH SHARE $-

6

SUMTER 3C2249

ONE STANDARD VAN AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SRARE $

17

FEDERAL TRANSIT ADHIN FUNDS

GA. SRARE $

2

0TH SHARE$

2

SUMTER 321750

SR 30/US 290 FH FELDER ST/CR 307 TOW OF SUN VALLEY DR RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 1.90 HANAGER:_RON BRAZIEL

CONG DIST, 2
GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY ROW 1992 UNDERWAY CONST 1995 $ 3674
FED SHARE $ 2939 GA, SHARE $ 735 0TH SHARE $

SUMTER 322193

SR 3/US 19@ CSX RR S/US 290 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .03 MANAGER: K FULBRIGHT (HI

CONG DIST. 2 GRIP .PROJECT
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 322190 IS AN ASSOCIATED PROJECT.

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

~~nR~IA P~PAPTMENT OF TRAtt5rORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY l994/FY 1996

16-Sep-1993 Page 296

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-SU-M--TE-R-----SR---J/-U-S---1-9-@---H-U-C-R-A-L-O-O-C-H-E-E--C-R-~--N-/-S-R--J-O-B-------------------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-WAY

322197 UHM. or THE EXISTING BRIDGE(SJ. FROM 2 LANES TO 4 LANES.

CONG DIST. 2

ROW NONE $

o

PROJECT MILEAGE : .20

GRIP PROJECT

CONST

.AFTER 96

MANAGER: H GANNAWAY (HI

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADHIN FUNDS

322195 IS AN ASSOCIATED PROJECT.

SUMTER 322210

SR 27 nt SR JO/US 280 EAST TO EAST or SOUTHLJ\ND/DELLWOOD DR
RECONSTRUCTION, WIDENING FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE: .90 MANAGER: RON BRAZIEL

CONG DIST . 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 UNDERWAY ROW 1993 UNDERWAY CONST 1994 $ 668
FED SHARE $ 534 GA. SHARE $ 1J4 0TH SHARE $

SUMTER J22J10

SR 3/US 19 8 BEAR BRANCH S/SR 27
REPLACEMENT or THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .01 MANAGER: H GANNAWAY (HI

CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADHIN FUNDS 322195.IS AN ASSOCIATED PROJECT.

Pl!! 1993 ROW NONE
CONST

UNDERWAY

$

0

AFTER 96

SUMTER 322430

SR 27/US 280 EB FH HP 6,7-8.2tlm HP 9.49-8.05
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.94 MANAGER: GORDON BROWN(HI

CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

Pl!! 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

SUMTER 322690

SR 27 AT SR 49 IN AMERICUS INTERSECTION IHPROVEHENT / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES:-0 /PROPOSED LANES: 0
MANAGER:

SUMTER 331540

AMERICUS NORTH BYPASS FH SR 3/US 19 TO CR 297 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : '3,23 MANAGER: GORDON BROWN

SUMTER 332088

SR 27 FH CR 250 (HP 15.5) TO SR 195 (HP 24.0J MINOR WIDEN, RESURF / MAINTENANCE PROJECT MILEAGE : 9,30 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROO~

CONG DIST, 2 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 2 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST, 2 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE1994. $

10

ROW 1995 $

10

CONST 1996 $ 289

FED SHARE$ 289

GA. SHARE$

0TH SHARE$

PE 1992 UNDERWAY ROW LOCL CONST 1995 . $ 2067
FED SHARE$ 1654 GA, SHARE$ 413 0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 295

FED SHARE$ 236

GA. SHARE$

59

0TH SHARE$

,.

.. ~

~

lfi!9

~


~
t

-=

~@.~~

~-Jmf~

~~:?:$

~:~,

. if,;t:11'!::!l ~ ~

~

!l',11-0",,'li

,,,~~t;::-~t~:

'' . -..,.
1-- -""

f:;
'

.

/

G0RGIA DPMTHNT or TRANSPORTATION
STAT TRANSPORTATION IHPROVHNTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 297

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEM

ESTS

-SU-M--TE-R----S-R---37-7-/-.A-H--E-R-I-C-U-S-@---G--0-R-G-IA---S-O-U-T-H-W--S-T-E-R-N--M-----------------------------------------------------------------P-E--1-9-8-9-----U-N-D-ER-W--AY

350750 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.

CONQ DIST. 2

ROW

J\FTER 96

PROJECT MILEAGE : .38 HJ\NAGER: GORDON BROWN

FUND SOURCE: BRIDGE PROGRAM

CONST

AFTER H

FEORAL HIGHWAY ADMIN FUNDS

SUMTER 37095X

ANDERSONVILLE NATL PRISONR/WM HUSUM ENTRANCE RD/SEE HJ\CON UNl'CNOWN / UNl'CNOWN PROJECT MILEAGE: .00 - EXIST. LJ\NES: 0 /PROPOSED LANS: 0 HJ\NAGER:

SUMTER 42198X

SR 49@ KINCHAFOONEE CAA/SE! TERRELL CO UNKNOWN/ UN~NOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 HJ\NAGER: UNKNOWN

CONG DIST. 2 FUND SOURCE: TRANS. ENHJ\NCE. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY I\DMIN FUNDS 421980 IS .I\N ASSOCIATED PROJECT.

PE LOCL

ROW NONE $

0

CONST 1994 $

0

FED SRME $

GA. SHARE $

0TH SHARE$

PE 1992 UNDERWAY

ROW 1994 $

0

CONST 1995 $

0

FED SHME $

GA. SHARE$

0TH SHARE$

l:F:llP1;1J\ l'F:P/\RTMF.NT or Tl1.J\NSPOl1.T/\TIOII
ST/\TE TRANSPORT/\TION IMPROVEMENTS PROGRJ\M PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 298

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

.COMMENTS

YEAR

_ ESTS

TA-L-B-O-T----C-O-U-N-T-Y--O-P-E-R-A-T-E-D---P-U-B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------

381253 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 2

FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH

OPERATING 1994 $

72

FUND SOURCE: RURAL TRANSIT

FED SHARE$

410

FEDERAL TRANSIT AOHIN FUNDS

GA. SHARE $

0TH SHARE$

32

TALBOT 3812541

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ .OPERATIONS FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISR

CONG DIST, 2

I

OPERATING 1995 $

75

FUND SOURCE: RURAL TRANSIT

FED SHARE$

412

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

33

TALBOT 381255

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH

CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSlT AOHIN FUNDS

OPERATING 1996 $

77

FED SHARE$

43

GA. SHARE$

OTR SHARE$

341

TALBOT 3C2253

ONE STANDARD VAN ANO ONE MOBIL! RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1994

$

21

FUND SOURCE: RURAL TRANSIT

FED SHAP.E $

17

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

TALBOT 3C2254

ONE CONVERSION VAN"NITH LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1995

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT AOHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

TALBOT . 320892

SR 41 FH SR 85E TO HP 0.05/HERI: RESF FM HP 0.05 TO SECONDS
ADDITION OF A PASSING LANE, PROJECT MILEAGE : ,88 MANAGER: GORDON BROWN

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS

PE NONE $

0

ROW 1986 UNDERWAY

CONST 1994 $ 191

FED SHARE $ 153

GA. SHARE $

38

0TH SHARE $

TALBOT 322300

US 80@ BARFIELD CREER E/TAYLOR CO LINE REPLACEMENT OF THE EXISTING BRIDGES(SI. NO ADDED LANES, PROJECT MILEAGE : .25 MANAGER: GORDON BROWN

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHNAY ADHIN FUNDS

PE 1992 UNDERWAY

ROW 1994 $

4

CONST 1995

$ . 818

FED SHARE $ 654

GA. SHARE $ 1641

0TH SHARE $

.. -

...

,, t

.Q

~

~

~'~ ~,. I

E9~fJ3

~

~:rnffi

~,:;:e,

~!}

~~~;\.~

~.~,M~~
~

~!i.~

r,r~,,;:;~;~

i~-;~:.: :_;:

-

GEORGIA OEPMTHENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 299

COUNTY

DESCRIPTION

FISCAL

COST

P.1.NO.

PROJECT OATA

COMMENTS

YEAR . . ESTS

T-A-L-B-O-T----C-R---17-/-G-O-R-K-A-N---R-O-A-D-@---C-S-X--R-A-IL-R-O-A--D--N--C-I-T-Y--L-H-T--O-F--T-A-L-B-O-T-T-O-N-------------------------------------------------P-E--1-9-9-4-----$------10

371280 REPLACEMENT OF THE EXISTING BRIOGES(SI. NO ADOEO LANES.

CONG DIST. 2

ROW LOCL

PROJECT MILEAGE: .21

CONST 1996 $ 374

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 300

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

75

0TH SHARE$

r~F:nP.r, 111 (lEP I\PTMF.NT OF TRANSl"ORTI\T ION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page JOO

T-P-CAO-.LU-II.-NAN-TFOY-!R-. --CO-U--N-TY---O-PE-R-A--T-ED-DP-RE-OPS-UCJE-BRC-LI-TPI-CT-IDO-ATN-RT-AA-N-S-I-T--S-E-R-V-I-C-E---------------------------------.CO-H--H-E-N-T-S--------------------------F-IYS-EC-AA-R-L-------CE-OS-TS-ST--

2B1178 TRANSIT FACILITIES / OPERATIONS

CONG DIST. 11

FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH

OPERATING 1994 $

37

FUND SOURCE: RURAL TRANSIT

FED SHARE$

20

FEDERAL TRANSIT AOMIN FUNDS

GA, SHARE $

0TH SHARE$

17

TALtAFER COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1179 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: TALIAFERRO
MANAGER: STEVE KISR

CONG DIST. 11

OPERATING 1995 $

39

FUND SOURCE: RURAL TRANSIT

FED SHARE$

21

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$

OTR SHARE$

18

TALIAFER COUNTY OPERATED PUBLIC TRANSIT SERVICE
2B1180 TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1996 $

41

FUND SOURCE: RURAL TRANSIT

FED SHAAE $

23

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$

OTR SHARE$

19

TALtAFER ON! CONVERSION VAN WITR .LIFT 2C2178 TRANSIT FACILITIES / CAPITAL
FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1994

$

31

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT AOMIN FUNDS

GA, SHARE$

3

0TH SHARE$

3

TALIAFER ONE STANDARD VAN 2C2179 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1995

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL TRANSIT AOMIN FUNDS

GA, SHARE$

2

0TH SHARE$

2

TJI.LIAFER CR 80 OVER HAP.DEN CREEK NORTH OF SHARON 270800 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES.
PROJECT MILEAGE : .40 MANAGER: D, GRIFFITH

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE 1993 . UNDERWAY

ROW LOCL

CONST 1994 $ 293

FED SHARE$ 234

GA. SHARE$

59

0TH SHARE$

TALIAFER CULVERT EXT@ VAA LOC ON STATE ROUTES .. OGLETH/GREENE

27087Z BRIDGES/ MAINTENANCE

PROJECT MILEAGE : .00

MANAGER: L. "SEABROOK

1.

PE NONE $

0

CONG DIST, 2

ROW 1994 $

0

CONST 1994 $

0

FUND SOURCE: SURFACE TRANSPORT.

FED SR.11.P.E $

FEDERAL HIGHWAY ADMIN FUNDS

GA, SHARE$

270870 IS AN ASSOCIATED PROJECT,

0TH SHARE$

,,
"

~

,.

Cl

~

~

. .. ~..... ~~

~

f~fffia

~:~~

~

~

~;.,t::~

~

~~~

\t,:;:;;,:,.~

i
l-:--

.. .

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 301

T-ACP-OT-,IUT-.NN-NTA-OY-L-L. --SR---7-3-/U-S---3-0-1--FH-DP-RE-ONS-CJE-CR-CLI-TP/G-TL-IDO-EAN-NT-AN-V-I-L-L-E--T-O--E-V-A-N-S--C-O--L-I-N-E------------------------C-O-M-M-E-N-T-S--------------------------FP-IEYS-EC-A1A-R9-L9-2-----O-CEN-DOS-ETS-RTSW--AT

522000 RECONSTRUCTION, NIDENING FROM 2 LANES TO 4 LANES.

CONG DIST, 1

ROW 1995 $ 386

PROJECT MILEAGE: 7.16

CONST

AFTER 96

MANAGER: PETE BLOCKER

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADHIN FUNDS

TATTNALL SR 23@ THOMAS CREER 2 HI SE OF REIDSVILLE
522260 REPLACEMENT or THE.EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: PETE BLOCltER

TATTNALL SR 30/US 280: OVER THOMAS CREER NE OF REIDSVILLE
522620 REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES,

PROJECT MILEAGE : .00

MANAGER:

l

CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$

5

CONST 1995

$

751

FED SHARE $

601

GA. SHARE $ 150

0TH SHARE $

PE 1995 ROW CONST

$

10

AFTER 96

AFTER 96

TATTNALL SR 147@ OHOOPEE RIVER 4 HI SOUTH OF REIDSVILLE 531290 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,65 MANAGER: PETE BLOCkER
TATTNALL SR 196 OVER BEARD'S CREER, LONG COUNTY 541960 REPLACEMENT OF THE EXISTING BRIDGES(S), N9 ADDED LANES,
PROJECT MILEAGE : ,00 MANAGER:

CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 UNDERWAT

ROW 1994

$:-

5

CONST 1995 $ 3722

FED SHARE $ 2978

GA. SHARE $

744

OTR SHARE $

PE 1994 ROW 1996 CONST

$

10.

$

1

:AFTER 96

r.i::r,nr: I/\ l"lF:r/\PTMF:tlT Of" TIUINSNRT/\TION

ST/\TE TRJ\NSPORT/\TION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCJHPTION

-------- P,l,NO,

PROJECT DATA

COMMENTS

T-A-Y-L-O-R----S-R---96--9--B-E-E-C-H-W-O-O-D---SW--A-M--P-,--F-L-IN-T---R-IV-E-R---(-'--C-R-A-N-FO--R-D--C-O-U-N-T-Y-)--- -----------------

-

320950 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES,

CONG DIST. 2

PROJECT MILEAGE : 2.85

GRIP PROJECT

MANAGER: J, GRAYBEAL

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY AOMIN FUNDS

16-Sep-1993 Page 302

FISCAL

COST

YEAR

ESTS

---------------------------

PE 1984 UNOERWA?

ROW NONE $

0

CONST 1996 $ 3929

FED SHARE $ 3143

GA, SHARE $ 786

0TH SHARE $

TAYLOR 322010

SR 3@ FLINT RIVER/ALSO UPSON CO REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .20 MANAGER: H. ASHMORE

(

CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS 363558 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1995 $ 2137

FED SHARE $ 1710

GA. SHARE $ 427

0TH SHARE $

,.

,.

"t ...

="'-' ~

~

~



...

~ 14

~

~

~-~..:;:,5

B:'.J~

~ '"'"'"'''"!

1:.;;:ffi

~

~:,#-~~

,~~~:~:::;i.

0

,1,

M

GEORGIA DEPARTMENT or TIU\NSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 303

COUNTY

DESCRIPTION

FISCAL . COST

P,I,NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

TE-L-F-A--IR---C-O-U-N-T-Y--O--PE-R-A-T-E-D---P-U-B-L-I-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------

581318 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 8

FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISR

OPERATING 1994 $

39

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOHIN FUNDS

FED SHARE$

22

GA. SHARE$

0TH SHARE$

Ui

TELFAIR 5B1319

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

51

FUND SOURCE: RURAL TRANSIT

FED SHARE$

29

FEDERAL TRANSIT ADHIN FUNDS

GA, SHARE $

0TH SHARE$

22

TELFAIR 5B1320

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH

CONG DIST, 9

OPERATING 1996 $

54

FUND SOURCE: RURAL TRANSIT

FED SHARE$

31

FEDERAL TRANSIT AOHIN FUNDS

GA. SHARE$

OTR SHARE$

23

TELFAIR 5C2319

ONE CONVERSION VAN "ITR LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

TELFAIR 5C2319

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TELFAIR
MANAGER: STEVE KISH

CONG DIST. 8

CAPITAL 1995

$

29

FUND SOURCE: RURAL TRANSIT

FED SHARE$

23

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

TELFAIR 521570

SR 31/US 441@ ALLIGATOR: BIG HORSE OFLOW: BIG HORSE c~s REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE: .15 MANAGER: H, REYNOLDS

CONG DIST. 9 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 522530 IS AN ASSOCIATED PROJECT,

PB 1999 ROW 1993
CONST

UNDER"AY UNOER"AY AFTER 96

TELFAIR 531105

SR 729/S MCRAE BYP FM SR 30/US 290 SE TO SR 31/US 441
CONSTRUCTION or NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 1.63
MANAGER: K FULBRIGHT (M)

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 UNDER"AY RO" 1994 $ 150 CONST 1996 $ 1913
FED SHARE $ 1450 GA. SHARE $ 363
0TH SHARE $

'

r.r.npr, I II J1F.P/\RTMF:trT OF TRJ\tlSP0RTIITIOtl ST/\TE TRJ\NSP0RTIITION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 304

COUNTT P.I.NO.

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL YEAR

COST ESTS

T-5-E3-2L-5F-6A-0I-R---RSREP-L-3A-0C/-UE-MS-E-N-2T-8-0o-@r---TTR-UI-!R!-N-EP-XI-IM-ST--ICN-RG-E-E-~B-R-1I-D.-2G-l-H!!-SI-(-SI!!-I.-O-NF-O-M-AI-LD-AD-NE-D--L-A-N-E-S-.-----------C-O-N--G-.D-I-S-T-.--8---------------------------R-OP-WE--11-99-99-45-----$$------1170

PROJECT MILEAGE: .23
HANAGER1

FUND SOURCE: BRIDGE PROGRAM

CONST 1'96 $ 583 FED .SHARE $ 4H

FEDERAL HIGH"AY ADHIN FUNDS i~

GA. SHARE$ 117 0TH SHARE$

TELFAIR 542020

IR"INTON A~ AT NORFOL~ SOUTHERN RJ\ILROAD ... 1729122X RR XING / TRAFFIC 'ROJ'ECT MILEAGE: .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER1 WRESTER

!;c:>NG DIST. 8 .
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS

PE NONE $

0

ROW NONI!! $

0

CONST 1994 $

84

FED SHARE$

76

GA~ SHARI!! $

8

0TH SHARE$

!.

. .



(I I)

,...

~

~

~ ~1 TM..:.:...~,

~

= ~

~

P-11~~

!l:l&? Wd-""

~

~)

r,;:;~~

t:;:~,:~-ii

r.::i:::,,:::

.., ...

GEORGIA DEPAATHENT OF TRANSPORTATION
STATE TRANSPORTATION IHPROVEHENTS PROGRAMPROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 305

COUNTY P, 1.NO.

DESCRIPTION PROJECT DATA

COHHENTS

FISCAL - COST HAR . ' !STS

T-4-!2R-1R-9-8!L0-L---SR-RE-P-L-4A-9C-@E-M--E~IN-N-TC-H-oA-rF-O-TO-H-NE-E-EE-X-CI-SR-TE-IN-E-G~-/-B-AR-LI-SD-OG--ES-US-M(S-T-)E.-R-N-OC-O-A-D-D-E-D--L-A-N-E-S-.-----------C-O-N-G--D-I-S-T-.--2---------------------------R-OP-WE--11-99-99-24-----U$-ND-E-R-W--AY1

PROJECT MILEAGE : .50

CONST 1995 $ U35

MANAGER: J. LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 1148

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 287

- OTB SHARE $

T!RR!LL 422370

SR 45 AT SR 520 IN DAWSON INTERSECTION IHPROVEHENT / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

P! 1994 $

9

ROW 1995 $

10

CONST 1996 $ 289

FED SHARE$ 289

GA. SHARE$

0TH SHARE$

TERRELL 442570

SR 55 REALIGNMENT FM HP 7 TO HP 7.4 NORTH OF HEROD RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED, PROJECT MILEAGE: ,40 MANAGER:

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE NONE $

0

ROW 1995 $

8

CONST 1996

$

125

FED SHARE$ 100

GA. SHARE$

25

0TH SHARE$

(

1:r,op,:111 l>F.rl\llTMF.NT OF" TRJ\NSN>RT/\TTON

16-Sep-1993

ST/\TE TRANSPORTATION IMPROVEMENTS PROGR.J\H
PROJECT LISTING BY COUNTY FY 1994/FY 1996

Page 306

COUNTY

DESCRIPTION

FISCAL

COST

P, I ,NO,

PROJECT DATA

COMHENTS

YEAR

ESTS

TH-O-M--A-S---S-R---1-22--W--B-H--P--4-.4---T-O--5-.-4-:--E-B--H-P--7-,-3--T-O--8-.-3----------------------------------------------------------------P-E--1-9-9-3-----U-N-D-E-R9-f-AY

421830 ADDITION or A PASSING LANE.

CONG DIST. 2

ROW 1993 UNDER9fAY

PROJECT MILEAGE: 2.00

CONST 1994 $ 816

MANAGER: J. LINDSEY

FUND SOURCE: SURFACE TRANSPORT.

FED SKARE$ 653

FEDERAL HIGH9fAY ADMIN FUNDS

GA, SR.ARE$ 163

0TH SHARE$

TROMAS 421970

SR 38/US 84 BUS@ CSX RR NW/THOMASVILLE REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : 1,00 MANAGER: J. LINDSEY

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNOER9fAY

ROW 1994

$

1

CONST 1995 $ 2124

FED SHARE$ 1699

GA. SH.ARE$ 425

0TH SH.ARE$

THOMAS 431090

SR 133@ PISCOLA CREER Nor BOSTON REPLACEMENT or THE EXISTING BRIDGES(SJ. NO ADDEO LANES.
PROJECT MILEAGE ! .50 MANAGER: J. LINDSEY

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNOER9fAY

ROW 1994 $

1

CONST 1995 $ 751

FED SHARE$ 601

GA. SHARE$ 150

0TH SHARE$

THOMAS U2500

METCALFE ROAD/CR 384 OVER PINE CREER REHAB. OF THE EXISTING BRIDGE(SJ. FROH 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.00 HANAGERt J, LINDSEY (M)

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW LOCL CONST

$

6

AFTER 96

THOMAS U255X

SR 188 OVER BARNETTS CREER SEE GRADY COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE: ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

0

$

0

AFTER 96

THOMAS .450460

CS 245/PINE TREE BLVD@ OLIVE CR/THOMASVILLE REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE: .20 MANAGER:

THOMAS 470693

CR 36/POPE ROAD OVER PISCOLA CREEK REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .10 MANAGER: J. LINDSEY

CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

12

ROW LOCL

CONST 1996 $ 388

FED SHARE$ 311

GA. SHARE$

78

0TH SHARE$

PE 1993 UNDER9fAY

RON LOCL

CONST 1995 $ 160

FED SHARE$ 128

GA. SHARE$

32

0TH SHARE$

,, ti

....

~

-~

~= . ., ~

.,,

~
~

~?.2:.(3

~

r#f~fi~~~

~~~i

~~41

c:.:.:iitt*

~

~;;,~-;~

;i;~i:r-0

i;:::,;i:.;~,

.. i

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM -PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 307

COUNTY P, I ,NO,

DESCRIPTION PROJECT DATA

COHHl!:NTS

FISCAL YEM

, , COST ESTS

TIFT

COUNTY OPERATED PUBLIC TRANSIT SERVICE

- -------------------------------

481273 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 8

FUNDS RECIPIENT: TIFT MANAGER: STEVE KISH

OPERATING 1994 $

51

FUND SOURCE: RURAL TRANSIT

FED SHARE$

30

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE $

0TH SHARE$

21

TIFT 481274

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TIFT MANAGER: STEVE KISR

'

CONG DIST, 8

OPERATING 1995 $

53

FUND SOURCE: RURAL TRANSIT

, FED SHARE $

31

FEDERAL TRANSIT ADMIN FUNDS

GA, SHARE$

0TH SHARE$

22

TIFT 481275

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TIFT
MANAGER: STEVE KISH

CONG DIST, 8

OPERATING 1996 $

55

FUND SOURCE: RURAL TRANSIT

FED SHARJ!! $

32

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

23

TIFT 4C2273

ONE CONVERSION VAN WITH LIFT ANO ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TIFT MANAGER: STEVE KISH

CONG DIST, 8

FUND SOURCE: RURAL TRANSIT

CAPITAL 1994

$

32

FED SRAAE $

26

FEDERAL TRANSIT ADHIN FUNDS

GA, SHARE$

3

0TH SHARE$

3

TIFT 410240

I-75 FM N CITY LIMITS OF TIFTON TO TURNER COUNTY LINE RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES,
PROJECT MILEAGE: 8.10 MANAGER: H. ASRHORE(M)

CONG DIST, 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 ROW CONST

ONOERWAY AFTER 96 AFTER 96

TIFT 410490

I-75@ SOUTHWELL BLVD/CR 204 SOUTH OF TIFTON LIGHTING/ ENHANCEMENT PROJECT MILEAGE: 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RON BRAZIEL

TIFT 41053X

I-75 FM CR 246/COOK TO CR 204/TIFT .. SEE COOK COUNTY

UNKNOWN/ UNKNOWN PROJECT MILEAGE :

;oo

-

EXIST.

LANES:

0

/PROPOSED

LANES:

0

MANAGER: UNKNOWN

CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410530 'Is AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

RON NONE $

0

CONST 1994 $ 268

FED SHARE $ 214

GA. SHARE $

54

0TH SHARE $

PE 1993
ROW CONST

UNDERWAY
AFTER 96 AFTER 96

1;r.,,p1:111 or::rl\PTHF:tlT OF TRJ\llSrPRT/\TIOtl

16-Sep-1993

ST/\TF: TRAtlSPORT/\TlON IHPROV'EHENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

Page 308

COUNTY

DESCRIPTION

FISCAL

COST

P. f ,NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

T-I-F-T-------I--7-5--A-T--2-N--D-.S-T-R-E-E-T---A-ND---8T-H---STREET/TIFTO-N---------------l.

------------------------------------------------------------------

PB NONE $

0

410580 LANDSCAPING/ ENHANCEMENT

CONG DIST. 8

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

80

MANAGER:

FUND SOURCE: TRANS. ENHANCE.

FED SHARE$

64

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

24

0TH SHARE$

40

TIFT 422170

SR 125/TIFTON FM 20TH ST TO 40TH ST
TURN LANES/ TRAFFIC PROJECT HILBAGB: 1.05 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER! J. LINDSEY

CONG DIST, B
FUND SOURCE: HWY, SAFETY FEDE~ HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1995 $ 230

CONST 1996 $ 567

FED SHARE$ 510

GA. SHARE$

57

0TH SHARE.$

TIFT 442070

SR 125/TIFT AVE@ CR 413/20TH ST INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,15 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: J. LINDSEY

CONG DIST. B
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PB NONE $

0

ROW LOCL

CONST 1994 $ 139

FED SHARE$ 124

GA. SRARB $

14

0TH SHARE$

,, fl

f1

~

~

. == ~.

,.

~

E\.t}l~j

- ~---~ ~Jifi~ ~

~

~*-~ ~~

~t,;,)ij

.~:-~: .. ,.:<.

''



GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 309

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

T-O-O-M--B-S---S-R---4/-U-S---1--9--RO--CK-Y---C-R--K-'--L-IT--T-L-E--R-O-C-K-Y--C-R-K-S--S-/L-Y-O--N-S--------------------------------------------------------P-E--1-9-9-2-----U-N-DE-R-W--AY

522185 REHAB. or THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES.

CONG DIST, 1

ROW NONE $

O

PROJECT MILEAGE: ,40

GRIP PROJECT

CONST

AFTER 96

MANAGER: J, GRAYBEAL(M)



FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

522190 IS AN ASSOCIATED PROJECT.

TOOMBS 522225

SR 4/US l 9 COBB CREEK
REHAB. or THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE I 2,00
MANAGER: J, GRAYBEAL

CONG DIST, 1 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 522220 IS AN ASSOCIATED PROJECT.

PE 1993 ONDERWAY

ROW NONE $

0

CONST 1996 $ 275

FED SHARE$ 220

GA. SHARE$

55

0TH SHARE$

TOOMBS 522270

SR 130 9 SWIFT CREEK 1 HI NE or VIDALIA REPLACEMENT or TRE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .50 MANAGER: PETE BLOCKER

CONG DIST, 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDER.WAY

ROW 1994 $

6

CONST 1995 $ 824

FED SHARE$ 659

GA. SHARE$ 165

0TH SHARE$

TOOMBS 522320

SR 30 FH MORNINGSIDE TO BROAD FOOT/NOBLE ST(' 1-WAY PAIR)
CONSTRUCTION or NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 2.15 MANAGER: J. GRAYBEAL(M)

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1995 $ 394 CONST 1996 $ 3705
FED SHARE$ 2964 GA. SHARE$ 741 0TH SHARE$

TOOMBS 532400

CR 364/0LD RIVER RD OVER WILLIAMS CREEK
REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,25 MANAGER: PETE BLOCKER

CONG DIST. l
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1995 ROW LOCL CONST

$

8

AFTER 96

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

r;r::oRr.rl\ [lF.PI\RTMF:NT OF TllANSPORTI\TION STI\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COHM!!NTS

TREUTLEN COUNTY OPERATED PUBLIC TRANSIT SERVICE
281183 TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TREUTLEN MANAGER: STEVE RISH

. CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

TREUTLEN COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1184 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT:TREUTLEN MANAGER: STEVE RISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

TREUTLEN COUNTY OPERATED PUBLIC TRANSIT SERVICE
2B1185 TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TREUTLEN
MANAGER: STEVE RISR

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

TREUTLEN ONE STANDARD VAN AND ONE MOBILE RADIO
2C2183 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TREUTLEN MANAGER! STEVE ~ISR

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

TREUTLEN I-16 AT OVERPASS FOR CSX RAILROAD 210610 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER:
r.
TREUTLEN REPLACE BRIDGE CARRYING CSX RR OVER SR 29 .222200 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .40 MANAGER: D. GRIFFITH

CONG DIST. 8 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TREUTLEN SR 29@ RED BLUFF CREER 222205 REHABILITATION OF THE EXISTING BRI[?.GE(S). NO ADDED LANES.
PROJECT MILEAGE : .40 MANAGER: D. GRIFFITH

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 310

FISCAL YEAR

COST . _ESTS
. -----

OPERATING 1994 $

29

FED SRARE $

17

GA. SHARE$

OTR SRARE $

12

OPERATING 199S $

30

FED SHARE$

18

GA. SHARE$

0TH SHARE$

12

OPERATING 1996 $

32

FED SHARE$

19

GA. SHARE$

0TH SHARE$

13

CAPITAL 1994

$

21

FED SHARE$

17

GA. SHARE$

2

. 0TH SHARE $

2

PE 1994 $

17

ROW NONE $

0

CONST 1996 $ 578

FED SHARE$ 520

GA. SHARE$

58

0TH SHARE$

PE 1993 UNDERWAY

ROW 1994 $

5

CONST 1995 $ 1537

FED SRARE $ 1230

.GA. SHARE $ 307

0TH SHARE$

PE 1993 UNDERWAY

ROW 1994 $

10

CONST 1995 $ 319

FED SHARE$ 255

GA. SHARE$

64

0TH SHARE$

..

.. ~

!ft .

~

~

. ~

~
"

~~

ftA>i~

~

~~J

~~

~

~i

~~'1

fi~~~~

~~.,,::....,,

... .,
,, ~-~~

.'

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 311

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL YEAR

COST ESTS

T2-R3-E0-U9-T8-L0-E-N--R-SRE-P-L-4A-6C-@E-M--EPEN-N-TD-o-LE-rT-O-TNH--E-C-ER-EX-EI-RS-T-IN--G--B-R-I-D-G--E-S-(S--).--N-O--A-D-D-E-D--L-A-N-E-S-.-----------C-O-N-G--D-I-S-T-,--8---------------------------R-OP-WE--11-99-99-33-----U$-N-D-ER-W--AY1

PROJECT MILEAGE: .25

CONST 1994 $ 810

MANAGERr D. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 648

FEDERAL HIGHWAY ADHIN FUNDS

GA, SHARE $

162

OTB SHARE $

TREUTLEN SR 171.@ THIGPEN HILL CREEK NE/SOPERTON
231140 REPLACEMENT or THE EXISTING BRIOGES(S). NO ADDEO LANES.
. PROJECT MILEAGE : ,10 MANAGER: D. GRIFFITH

CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1994

$

186

FED SHARE $ 149

GA, SHARE $

31

OTB SHARE $

TREUTLEN SR 46@ RED BLUFF CRK 231190 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .19 MANAGER: D, GRIFFITH

CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

312

FED SHARE$ 250

GA, SHARE$

62

0TH SHARE$

t

COUNTY P.1.NO.

DESCRIPTION PROJECT DATA

1:r.rir,r.111 l'F.Pl\f"ITMF.IIT OF TR/\tlSPORTI\TIC111 STIITE TRJ\tlSPORTIITION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

TROUP 3B1258

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TROUP MANAGERt STEVE ~ISR

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

TROUP 3B1259

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TROUP MANAGER: STEVE ~ISR

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

TROUP 3B1260

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TROUP MANAGER: STEVE ~ISR

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

TROUP 3C2258

ONE CONV. VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TROUP COUNTY MANAGER: STEVE-~ISR

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

TROUP JC2259

TWO STANDARD VANS AND TWO MOBILE RADIOS
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TROUP MANAGER! STEVE ~ISR

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

TROUP 310730

I-185 CONN@ I-85' I-1851 INTERCHANGE CONSTRUCTION INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .85 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M GANNAWAY (M)

CONG DIST. 7 GRIP PROJECT FUND SOURCE: NAT'L.HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 312

FISCAL YEAR

COST . ESTS
-

OPERATING 1994 $

69

FED SHARE$

u

GA. SRA.RE$

OTR SHARE$

28

OPERATING 1995 $

72

FED SRA.RE$

43

GA. SHARE$

OTR SHARE$

29

OPERATING 1996 $

74

FED SRA.RE$

u

GA. SRA.RE$

0TH SHARE$

30

CAPITAL 1994

$

54

FED SRA.RE$

43

GA. SHARE$

5

OTR SHARE$

5

CAPITAL 1995

$

42

FED SRA.RE$

34

GA. SHARE$

4

OTH SHARE $

4

Pl!! 1994 ROW NONE CONST

$' 147

$

0

.AFTER 96

TROUP 311300

SR 219 FM 800' S/I-85 TO 300' N/I-85 RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : .42

MANAGER: RON BRAZIEL

'

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 331530 IS AN ASSOCIATED PROJECT.

PE 1991 'UNDERWAY
ROW 1993 UNDERWAY CONST 1995 $ 2244
FED SHARE $ 1795 GA. SHARE $ 449 0TH SHARE $

..

,.

it

If

Effl5i

.~

~- . . =~ ~ =c-=

~y~

i;~.ljt*@

~~

~

r~

~~

~~~

\;C:'.;~;;:l

t~~ .:: ... '.~=:

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY P, I.NO,

DESCRIPTION PROJECT DATA

COMMENTS

ALABAMA TROUP CALL BOXES ON I-85 FM

TO SR 74/FULTON .. SEE HARRIS

.

.

31171X UNICNOWN / UNKNOWN PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONG DIST, 7 I 3

MANAGER:

FUND SOURCE: I-STATE HAINT.

FEDERAL HIGHWAY ADMIN FUNDS

TROUP 31172W

CALL BOXES ON I-185 FM SR 22/HUSCOGEE TO I-85, .. SEE MUSCOGEE UN~NOWN / NEW CONSTRUCTION PROJECT MILEAGE I .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER!

CONG DIST. 3 , 7
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS

TROUP 321715

SR 14/US 29 FM CR 109/TEAVER RD TO CR 130/0LD AIRPORT RD RECONSTRUCTION, WIDENING FROH 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.13 MANAGER! BEN BUCRAN (H)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

.If.



16-Sep-1993 Page 313

FISCAL YEAR

COST ESTS

PE 1994 -;:-----0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$ GA. SHARE$

0TH SHARE$

PE 1994 $

0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA. SHARE$

0TH SRAAE $

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

TROUP 321720

SR 1@ UNNAMED TRIBUTARY TO WEST POINT LAJl:E
REPLACEMENT OF THE EXISTING BRIDGES(S), FROH 2 TO 4 LANES.
PROJECT MILEAGE: ,30 MANAGER! H GANNAWAY

TROUP 322230

SR 14 N,sB FM HP 3,87-5.371 NB HP 7.07-8.41 ADDITION OF A PASSING LANE, PROJECT MILEAGE I 2,94 MANAGER: GORDON BROWN(H)

CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 362920 IS AN ASSOCIATED PROJECT.
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY

ROW 1995 $

17

CONST 1996 $ 920

FED SHARE $ 736

GA. SHARE $ 194

OTR SHARE $

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

TROUP 322240

SR 109 fM I-85 TO I-185 INCL I-85 RAMP RECONSTRUCTION, WIDENING FROH 2 LANES TO 5 LANES.
PROJECT MILEAGE: ,80 MANAGER! H GANNAWAY (HJ

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

TROUP 322250

SR 1/US 27/LAGRANGE FM AUBURN ST TO SR 219/MORGAN ST RECONSTRUCTION, WIDENING FROH 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.42 MANAGER: RON BRAZIEL (H)

CONG DIST. 7 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

ONOERWAY AFTER 96 AFTER 96

r.F:oJ>r; I 11 ()F.r 1\RTHF::IIT OF' TRI\IISPORT 1\T IOtl
STATE TAANSPORtATI9N IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 314

COUNTY

DESCRIPTION

FISCAL

COST

P, I ,NO,

PROJECT DATA

. COMMENTS

YEM

ESTS

TR-O-U-P-----S-R---14--B-T--L-A-G--R-A-N-G-E-/H--O-G-A-N-S-V-I-L-L-E--S-B--H-P--2-3-.-8---2-4-.9-5-:-N--B--2-4-.-9---2-6-.-5----------------------------------------------P-E--1-9-9-2---~U-N-D-ER-W--AY

331400 ADDITION or A PASSING LANE.

CONG DIST. 7

ROW 1994 $

85

PROJECT MILEAGE : 2. 50

CONST

AFTER 96

MANAGER: GORDON BROWN

FUND SOURCE: SURFACE TRANSPORT,

FEDERAL HIGHWAY ADHIN FUNDS

TROUP 331530

SR 219 FM S/CR 91 TO 1000' N/CR 304 (EXCEP IR-85-1(295)) RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : ,78 MANAGER: RON BRAZIEL

TROUP 331800

SR 14 SW OF HOGANVILLE@ SHOAL CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,25 MANAGER:)GORDON BROWN

TROUP 34'2410

SR 109@ FLING/WHITMER RDS-TURN LANE, LOWER RILL CREST
INTERSECTION IMPROVEMENT / TRAFFIC PROJECT MILEAGE : .33 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER! GORDON BROWN

TROUP 350920

SR 109 8 CSX RR WEST or SR 14 INTERSECTION
BRIDGES/ RECST, OR REHAB. PROJECT MILEAGE: 1.00 MANAGER! BEN BUCHAN (HI

TROUP 370902

CR 191 WEST OF MERIWETHER CO LINE@ SULPHUR CRK REPLACEMENT OF THE EXISTING BRIDGES(SI. NO ADDED LANES,
PROJECT MILEAGE: .38 MANAGER: GORDON BROWN

TROUP 370907

CR 418/MOBLEY BRIDGE RD@ YELLow JACKET CRK TRIBUTARY REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .38 MANAGER: GORDON BROWN

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS 311300 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 1174
FED SR.ARE$ 939 GA. SHARE$ 235 OTR SHARE$

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994 $

15

CONST 1994 $ 681

FED SHARE$ 545

GA. SHARE$ 136

0TH SHARE$

CONG DIST. 7,
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1993 UNDERWAY

CONST 1994 $ 252

FED SHARE$ 227

GA. SHARE$

25

0TH SHARE$

CONG DIST, 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY
ROW 1994 $ 400 CONST 1996 $ 2000
FED SHARE$ 1600 GA. SHAP,E $ 400
0TH SHARE$

CONG DIST, 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS.

PE 1992 UNDERWAY

ROW LOCL

CONST 1994 $ 380

FED SHARE$ 304

GA. SHARE$

76

0TH SHARE$

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$

485

FED SHARE $ 388

GA. SHARE$

97.

0TH SHARE$

"

., .-;

;

~

~ ~

~ ,., -,, ~,. e1~Jt1

= ~

~

ffli~

~~

~*' ~:el -

!;<ii~~

(#~~

... \i..-,'.~:;:,. ': ,.'.\.

'



GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGIU\H PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 315

COUNTY

DESCRIPTION

FISCAL . COST

P,I,NO,

PROJECT DATA

COHHl!!NTS

YEAR

ESTS

TU-R-N-E-R-----I--7-5--F-M--T-H-E--T--IF-T---CO--U-N-TY---L-IN--E--T-O--S-R--1-5-9------------------------------------------------------------------p-g--1-9-9-5-----$-----2-45

410245 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.

CONG DIST. 8

ROW

AFTER 96

PROJECT MILEAGE: 11.07

CONST

AFTER 96

MANAGER: H. ASHHORE(H)

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADHIN FUNDS

TURNER 41024X

I-75 FM N.CITY LIMITS or TIFTON TO TURNER CTY LINE/SEE TIFT
RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE I ,00
HANAGERt R. ASRHORE

TURNER 410250

I-75 FH SR 159 NEAR ASHBURN TO 1 HILES OF CR 117/CRISP RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE: 16.50 MANAGER: H. ASHMORE(H)

CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS 410240 IS AN ASSOCIATED PROJECT.
CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1986 ROW CONST

UNDERWAY AFTER 96 AFTER 96

PE 1987 ROW CONST

UNDERWAY AFTER 96 AFTER 96

TURNER U0590

I-75 REST AREAS 19,110 IMPROVE SANITATION, LIGHTS, PARKING REST AREA / RECST. OR REHAB, PROJECT MILEAGE: .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER:

TURNER 43104X

SR 90 8 ALAPAHA RIVER/SEE BEN HILL COUNTY
UNICNOWN / UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNICNOWN

TURNER 431300

SR 32 OVER LITTLE SAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE: .00 MANAGER:

CONG DIST, 8 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 431040 IS AN ASSOCIATED PROJECT.
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$

50 0
1600 1440
160

PE NONE $ ROW 1994 $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 7700 18500 14800 3700

PE 1995 ROW CONST

$

10

AFTER 96

AFTER 96

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

r.F:f)Rl";JA ClF:rARTMF:IIT OF TRJ\NSrORTATIQN STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY.FY 1994/FY 1996
COMMENTS

TWIGGS 381442

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIP.IENT: TWIGGS MANAGER: STEVE KISH

CONG DIST. 11, 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

TWIGGS 381 3

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TWIGGS MANAGER: STEVE KISH

CONG DIST, 11, 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

16-Sep-1993 Page 316

FISCAL YEAR

COST . !STS
.

OPERATING 1994 $

21

FED SHARE$

13

GA, SHARE$

0TH SHARE$

e

OPERATING 1995 $

21

FED SHARE$

13

GA. SHARE$

OTR SHARE$

e

TWIGGS 381.44

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TWIGGS
MANAGER: STEVE KISH

CONG DIST. 11, 8

OPERATING 1996 $

22

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

13

GA. SHARE$

0TH SHARE$

9

TWIGGS 22207X

SR 87/US 23 FM S/BOLLINGER CM TO SR 96 . SEE BLECKLEY CO UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER I UNKNOWN

CONG DIST, 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 222070 IS AN ASSOCIATED PROJECT,

PE NONE ROW 1994 CONST

$

0

$

0

AFTER H

TWIGGS 1-16 FH JCT I-75 TO TWIGGS/BLECKLEY CL,,,BIBB

PE NONE $

0

31168Z RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST, 8

ROW 1994 $

0

PROJECT MILEAGE: 31,70 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE HAINT,

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

311685 IS AN ASSOCIATED PROJECT,

0TH SHARE$

TWIGGS 321990

SR 96 BT HOUSTON CL, I-16( @ 5 LOC(2EB, 2ND' 1-REAL~~N) ADDITION OF A PASSING LANE, PROJECT MILEAGE : 6.15 MANAGER: GORDON BROWN

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY RON 1993 UNDERWAY CONST 1995 $ 2433
FED SKARE $ 1946 GA. SHARE $ 487 0TH SHARE $

TWIGGS 331840

SR 96 NB FM HP 16.2 - 17.81 SB MP 16.3 - 17.8 ADDITION OF A PASSING LANE.
PROJl:CT MILEAGE : 3.10
MANAGER: GORDON BRONN

CONG DIST, 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

RON 1994 $

93

CONST 1996 $ 1334

FED SHARE $ 1067

GA. SHARE $ 267

0TH SHARE $

,.

,, ,.

.~ ....

~

~

~ ~ 'I t

~~

~

ffitt~~

~~

~

~~

~~ ~ 'j;;';:,;;~"ii


~,ii:;

t::C:,:-;;

.' ..

GEORGIA DEPMTHENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 317

COUNTY

DESCRIPTION

FISCAL. . COST

P,I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

U--N-IO-N-----C-R---1-/P-A-T---C-O-LW--E-L-L--R-D--O-V-E-R--N-O-T-T-E-R-L-Y--R-I-V-E-R--N-W--B-L-A-I-R-S-V-I-L-L-E---------------------------------------------------P-E--1-9-9-3-----U-N-D-E-R-"A-Y

170870 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES.

CONG DIST. 9

ROW LOCL

PROJECT MILEAGE : ,15

CONST 1995 $ 1254

MANAGER! L. OWENS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 1003

FEDER.AL HIGH"AY ADMIN FUNDS

GA. SHME $ 251

OTR SHARE$

UNION 170871

CR 1/PAT COLWELL RD OVER YOUNGCANE CREEK" OF BLAIRSVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE I ,15 MANAGER: L. OWENS

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGH"AY ADMIN FUNDS

PE 1993 UNDER"AY ROW LOCL
CONST 1995 $ 782 FED SHARE$ 626 GA, SHARE$ 156 0TH SHARE$

,..-

r.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

r.F:OPr. t I\ ()f:P/\RTMF:NT Of' TRJltlSf'C>PTI\T ION STI\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY ry 1994/rY 1996
COMMENTS

UPSON 321730

SR 36:1 "8, 2 EB PPL; TL@ 2 LOCATIONS
ADDITION or A PASSING LANE.
PROJECT MILEAGE : 4.20 MANAGER! GORDON BROWN
.

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL RIGH9fAY ADMIN FUNDS

UPSON 321860

SR 36@ l)YAHAHA PK9'Yt2,3)@ INDUSTRIAL PARK14)MOORES XING RD
TURN LANES/ TRAFFIC PROJECT MILEAGE : 1.20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS

UPSON 32201X

SR 3/US 19@ FLINT RIVER SEE TAYLOR COUNTY UNKNOWN/ UN~OWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: H GANNAWAY

UPSON 322270

SR 22 SPUR@ AUCHUHPKEE CME/SR 3 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .25 MANAGER: GORDON BROWN

CONG DIST. 3 GRIP PROJECT FUND SOURCE: BRIDGE PROGR.AH FEDERAL HIGHWAY ADHIN FUNDS 322010 IS AN ASSOCIATED PROJECT.
CONG DIST. 3
FUND SOURCE: BRIDGE PROGR.AH FEDERAL HIGHWAY .ADMIN FUNDS

16-SPp-1993 Page 318

FISCAL

COST

------ YEAR

l!:STS

P-E---1-9-9-2-. --.UNDERWAY

ROW 1993 UNDERWAY

CONST 1994 $ 1357 FED SHARE$ 1086

GA. SHARE $ 271

OTR SHARE$

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995

$

399

FED SHARE $ 359

GA. SHARE $

40

OTR SHARE $

PE NONE $

0

ROW 1994 $

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

OTR SHARE$

PE 1992 ROW CONST

UNDERWAY
AFTER 96 AFTER 96

UPSON 322550

SR 74 FH HOLSTUN OR TOE OF ELEMENTARY DR IN THOMASTON RECONSTRUCTION, "IDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .99 MANAGER: GORDON BROWN(H)

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 250 AFTER 96

UPSON . 322700

SR 74 FM ROLSTON DRIVE TO UPSON ELEMENTARY IN THOMASTON INTERSECTION IHPROVEHENT / TRAFFIC PROJECT MILEAGE: .96 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

UPSON 331950

DELRAY RO/CR 425 FM SR 3 TO SR 36 RECONSTRUCTION' WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.90 MANAGER: GORDON BROWN(HI

CONG DIST. 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

14

ROW 1995 $

10

CONST 1996 $ 474

FED SHARE$ 474

GA. SHARE$

0TH SHARE$

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

.

;

,.

~

&J,.L.,,~

~

,,,

11:

~ 11

-....
"""'-'--.i"",,'1

~

~~

~~

'~1~

. ~ ~?4\

ji:~-.i.~i

~ii~

r,:,.~;_::,.i

-:~; ~<
l



GEORGIA OEPAATHENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 319

COUNTY

OESCRIPTION

FISCAL

. COST

P. I .NO,

PROJECT OATA

--- ----- ------- ----------- - UPSON SR 3/US 19@ JEFF OAVIS/HARP RO IN THOMASTON

COMMENTS

YE.All

ESTS

-----------------------------------------------------------------------

PE NONE $

0

342790 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 3

ROW 1994 $

5

PROJECT MILEAGE : ,15 - EXIST. LANES: 4 /PROPOSEO LANES: 6

GRIP PROJECT

CONST 1994

$

107

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

FED SHARE$

96

FEOERAL RIGHWAY ADMIN FUNOS

GA. SRARE $

11

0TH SRARE $

UPSON 371200

CR 214/ANOREWS CHAPEL RO. 9 SWIFT CREE~ 3 HIE OF THOMASTON REPLACEMENT OF TRE EXISTING BRIOGES(S). NO ADOEO LANES. PROJECT MILEAGE : .19 MANAGERt

CONG 01ST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

5

ROW LOCL

CONST 1996

$

173

FED SRARE $ 138

GA. SHARE$

35

0TH SRARP.: $

UPSON 371205

CR 164/NEW RARMONY RO@ WOLF C~ S OF THOMASTON REPLACEMENT OF TRE EXISTING BRIOGES(S). NO ADOED LANES. PROJECT MILEAGE : ,19 MANAGER:

CONG 01ST, 3
FUND SOURCE: BRIOGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

5

ROW LOCL

CONST 1996 $ 173

FEO SRARP.: $ 138

GA. SH.ARE$

35

0TH SRARP.: $

UPSON 371270

SCENIC RIGRWAY/US 19: RISTORICAL SILVERTOWN HILL VILLAGE
RIGHTS-OF-WAY/ ENHANCEMENT PROJECT MILEAGE: ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG 01ST. 3
FUND SOURCE: TRANS, ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS

PE 1996 ROW CONST NONE

$

8

AFTER 96

$

0

'

G~UPGIA n~rARTMtNT Of TRMJsrnnTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 320

COUNTY

DESCRIPTION

FISCAL

COST

p, I .NO,

PROJECT DATA

.

COMMENTS

YEAR

.. !STS

W-A-LK-E-R----C-O-U-N-T-Y--O-P-E-R-A-T-E-D---PU--B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------

681383 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 9

FUNDS P.ECIPIENT: WALKER MANAGER: STEVE KISH

OPERATING 1994 $

59

FUND SOURCE: RURAL TRANSIT

FED SHARE$

34

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

25

WALKER 681384

COUNTY OPERATED PUBLIC TRANSITSERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

61

FUND SOURCE: RURAL TRANSIT

FED SHARE$

35

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

26

WALKER 681385

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996 $

65

FED SHARE$

37

GA, SHARE$

0TH SHARE$

29

WALKER 6C2383

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WALKER
MANAGER: STEVE KISH

CONG DIST, 9

CAPITAL 1994

$

28

FUND SOURCE: RURAL TRANSIT

FED SHARE$

22

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

WALKER 6C2384

ON! CONVERSION VAN
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1995

$

29

FUND SOURCE: RURAL TRANSIT

FED SHARE$

23

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

WALKER 6C2385

TWO CONVERSION VANS TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH

WALKER 621190

CHICltAMAUGA BYP FM US 27 @CR 219 TON or LYTLE RO CONSTRUCTION or NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 3.20 MANAGER: M GANNAWAY

CONG DIST, 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CHATTANOOGA TIP I 1
CONG DIST, 9 GRIP PROJECT FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

CAPITAL 1996

$

57

FED SHARE$

46

GA. SHARE$

5

0TH SHARE$

6

PE 1992 UNDERWAY ROW 1992 UNDERWAYCONST 1994 $ 16020
FED SHARE $ 12015 GA. SHARE $ 4005
OTH SHARE $

...

.

~- {;

~

~

~. . ~~:-., ~:-. = (,~

l

~..

~~

~~

""''"""ii

~~

~

~_,i,~


fii:;~(::Jii !i/:;:--:,

' ..

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 321

COUNTY P,I.NO,

DESCRIPTION PROJECT DATA

1

COMMENTS

FISCAL YEAR

.. COST ESTS

W-A-L-K-ER----C-H--IC-l{-A-H-A-U-G-A---B-Y-P--F-H--N--L-Y-T-L-E--R-D-/-C-R--7-1-0--T-O--U-S--2-7--@-S-R--2-/C-A--T-O-O-S-A-------C-H-A-T-T-A-N-O-O-G-A--T-I-P--I--1---------------------P-E--N-O-N-E-----$------0

621192 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

CONG DIST. 9

ROW NONE $

0

PROJECT MILEAGE : 4. 60

GRIP PROJECT _

CONST 1994

$ 17603

MANAGER! H GANNAWAY

FUND SOURCE: STATE FUNDS

FED SRA.RE $ 13202

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$ UOl

62Yl92 IS AN ASSOCIATED PROJECT.

0TH SRA.RE$

WALKER 621650

SR 136 EB HP 21.4-22.8tEB 25.7-26.61"8 26.6-28.0 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.70 MANAGER! BILL MCVEY (H)

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

Pl!! 1992 ROW
CONST

UNDERWAY AFTER 96 AFTER 96

WALKER 630990

SR 337@ DUCK CREEK
REHABILITATION or THE EXISTING BRIDGE(S). NO ADDED LANES.
PROJECT MILEAGE : .10
MANAGER: BILL.MCVEY

WALUR 63107X

BURIUIALTER GAP RD EXT FM SR 189/DADE TO CR 392/SEE DADE CO

UNKNOWN/ UNKNOWN

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: UNICNOWN

.

WALKl!!R 631240

SR 341 FM GLASS HILL RD/CR 166 TO GORDON ST
TURN LANES/ TRAFFIC PROJECT MILEAGE : .50 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: BILL MCVEY (H)

"ALKER 631440

SR 1 AT LEE/GORDON HILL ROAD SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

WALKER 641810

SR 1/US 27 FH 1000' S/CR 220/LEE GORDON RD TO 800' N/CR 220 .ADDITION OF A PASSING LANE. PROJECT MILEAGE : ,34 MANAGER: BILL MCVEY

CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS 631070 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP I 17
CONG DIST. 9 FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADHIN FUNDS

PE 1988 UNDERWAY

ROW 1990 UNDERWAY

CONST 1995 $ 250

FEDSHARE $ 200

GA. SHARE$

50

0TH SHARE$

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

PE 1992 ROW
CONST

UNDERWAY
AFTER 96 AFTER 96

CHATTANOOGA TIP I 21
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CHATTANOOGA TIP I 4
CONG DIST. 9 GRIP PROJECT FUND SOURCE: SURFACE TRANSPORT, FEDERAL_ HIGHWAY ADHIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1996 $

u

FED SHARE$

51

GA. SHARE$

13

0TH SHARE$

PE 1993 UNDER"AY

ROW 1994

$

100

CONST 1995 $ 363

FED SHARE $ 290

GA. SHARE $

73

0TH SHARE $

r.r::n11.r:11\ (1F:rl\PTMF:IIT ()f TRJ\t1SP0RTI\TION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

---- P,I.NO,

PROJECT DATA

W--A-L-lt-tR----S-R--1-9-3--O-V-E-R--W--E-ST--C-R-I-C-IU-\-M-A-U-G-A---C-R-E-E-lt-----------------------------------

- - COMMENTS

-

Ctl960 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES.

CONG DIST, 9

PRQ~C~ MILEAGE : ,00

MANAGER:

FUND SOURCE: BRIDGE.PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 322

FISCAL

COST

---Y-E-M- ------E-ST-S---

PE 1994 $

10

ROW 1996 $.

1

CONST

AFTER 9fi

. r:

WALltER 650t90

MCFARLAND AVE AT WEST LAKE, MAPLE, JAMES ST, REVERSE LN SYS SIGNALS/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: .BURT RIDDLE

CHATTANOOGA TIP I 20
~Ot;IC? DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1994 $

10

ROW NONE $

0

CONST ..1995 $ 425

FED SHARE$ 340

GA. oTil

SsHHAARREE$$

85

. I .,

,,

~ #0

E$

&f!J

~

(._,

11.

~ tl

=, ; = . !

-~~

=w,=;;i

~J.5

1~ ",StP,C,""'1

(I~;;., ~ ,~1i~m-



t:

~~;,~~

[,.:~,'.~.~~

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPI\RTHENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996.
COMMENTS

WALTON 181049

CITY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF SOCIAL CIRCLE MANAGER: STEVE RISH

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

WALTON 1B1049

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS ltECIPIENT: CITY'OF SOCIAL CIRCLE MANAGER: STEVE RISR

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT J\DMIN FUNDS

WALTON 181050

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY or SOCIAL CIRCLE
MANAGER: STEVE RISR

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

WALTON 122560.

SR 91 AT MONROE YOUTR/CENTERHILL CHURCR ROAD TURN LANES/ TRAFFIC PROJECT MILEAGE: .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:

WALTON 122570

l
SR 10/US 79 MONROE TO ATHENS MEDIAN OPENINGS MEDIAN WORK/ TRAFFIC -PROJECT HILEAGE: 16,00 - EXIST, LANES: 4 /PROPOSED LANES: 4 MANAGER:

CONG DIST. 10 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHNAY ADHIN FUNDS

...

16-Sep-1993 Page 323

FISCAL COST

YEAR

ESTS

-. ------------------

OPERATING 1994 $

29

FED SRARE $

17

GA. SHARE $

0TH SHARE$

11

OPERATING 1995 $

29

FED SHARE$

17

GA. SHARE$

0TH SHARE$

12

OPERATING 1996 $

30

FED SHARE$

18

GA. SHARE$

0TH SHARE$

12

PE NONE $

0

ROW 1995 $

1

CONST 1996 $' 109

FED SRARE $

99

GA, SRARE $

11

0TH SHARE$

PE 1994 ROW NONE CONST

$

10

$

0

AFTER 96

WALTON 132HX

SR 10 FM ALCOVY RIVER/WALTON THRU OCONEE TO SR 8/CLARRE
GUARDRAIL/ TRAFFIC PROJECT HILEAGE: 10.10 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER

WALTON 132350

SR 10 AT CHERRY HILL ROAD
INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .28 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: L. OWENS

PE 1994 $

0

CONG DIST. 10

ROW NONE $

0

CONST 1996 $

0

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

FEDERAL HIGHWAY J\DMIN FUNDS

GA. SHARE$

132340 IS AN ASSOCIATED PROJECT.

0TH SHARE$

CONG DIST. 10
FUND SOURCE: HWY, SAFETY ~EDERAL HIGHWAY J\DMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 130

FED SRARE $ 117

GA, SHARE$

13

0TH SHARE$

r.F.tlPr. I" ('lf:PAFTMF.llT OF TRAtrsrcJRTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P. I .NO.

PROJECT DATA

W--M-.T-O-N----S-R---B-l -A-T--S-R--2-0---IN---L-O-G-A-N-V-I-L-L-E---------------------------------------

COMMENTS
- -----------

1t1860 TURN LANES/ TRAFFIC

CONG DIST. 10

PROJl!CT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER!

FUND SOURCE: HWY. SAFETY

FEDERAL HIGHWAY ADHIN FUNDS

WM.TON 170750

CR 162/COUNTY LINE RD@ ALCOVY RIVER
REPLACEMENT or THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES.
PROJECT MILEAGE l .22
HANAGER1 L. OWENS

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

WM.TON 170751

CR 162/COUNTY LINE RD@ BIG FLAT CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJl!CT MILEAGE: .22 HANAGERI L. OWENS

CONG DIST. 10
.FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

l

16-Sep-1993 Page 324

FISCAL

COST

--

YEAR

ESTS

--PE---1-9-H------$------u

ROW 1995 $

10

CONST 1996 $ 578

FED SKARE$ 520

GA. SHARE$

58

0TH SHARE$

P! 19BB UNDERWAY

ROW LOCL

CONST 1994 $ 470

FED SHARE$ 376

GA. SHARE$

H

0TH SHARE$

PE 1988 UNDERWAY

ROW LOCL

CONST 1994 $ 369

FED SHARE$ 295

GA. SHARE$

7t

0TH SHARE$

.

,.

'<-

,..

l!l!l1!B

~

~ ,.. ~ 1, - ~ ('

~

~

lffl!i;(i')~

~

,--~~~ ~~~~.:.:it~ ~~

tf,jirq

~;1:~~~i

coUNTY P. I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DErARTHENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

WARE 422125

SR 38/US 84@ SUWANNEE CRR RERAB, OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: N, PASSMORE (M)

CONG DIST. 1
GRIP PROJECT FUND SOORCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS

. ..

16-Sep-1993 Page 325

FISCAL

-

YEAR

PE 1996

ROW NONE

CONST

- COST ESTS

$

11

$

0

AFTER 96

WAR! 521530

SR 4/US 1/WAYCROSS FM N/BLACRSHEAR AVE TO CR 465@ JAMESTOWN

RECONSTRUCTION, WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 1.51

MANAGER: PETE BLOCRER

r.

CONG DIST, 1 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

WAR! 522775

SR 38/US 84 OVER GREASY BRANCA, LITTLE, BIG ALLIGATOR CREER RERAB, OF TR! EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES;
PROJECT MILEAGE : .00 MANAGER! H GANNAWAY (HI

WAR! 570980

RESTORE DEPOT, RAILWAY EXPRESS IN WAYCROSS MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT, PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 522770 IS AN ASSOCIATED PROJECT.
CONG DIST. 1
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS

PE 1995 ROW NONE CONST

$

30

$

0

AFTER 96

PE 1994 $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

80
0
1170 936 16 250

GF.0Rf;l1\ PF.F'l\RTMF.NT or TIU\tlSF'ORT!\TION
ST!\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

1_6-Sep-1993 Page 326

COUNTY

DESCRIPTION

P.1.NO.

PROJECT DATA

"-A-A-R-E-N-----C-O-U-N-T-Y--O-P-ERATED PU--B-L-IC---T-R-A-N-SIT

'-.

FISCAL

COST

SERVICE-----------------------------------C-O-M-M-E-N-T-S----------------------------Y-EA-R--~----. -E-S-T-S

281188 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 11

FUNDS RECIPIENT: ffARREN MANAGER! STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $ FED SHARE$ GA. SHARE$

39 23

0TH SHARE$

u

WARREN 2Bll89

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS MCIPIENT: WARREN MANAGER! STEVE KISH

CONG DIST. 11

FUND SOURCE:.RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

OPERATING 1995 $
FED SHARE$ GA. SHARE$

u
241

0TH SHARE$

17

WARREN 281190

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WARREN
MANAGER! STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

OPERATING 1996 $

413

FED SHARE$

25

GA. SHARE$

0TH SHARE$

18

"All.REN 2C21BB

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENTi WARREN MANAGER: STEVE ~ISH

CONG DIST, 11

CAPITAL 1994

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE$

u

r.

FEDERAL TRANSIT ADHIN FUNDS-

GA. SHARE$

2

0TH SHARE$

2

WARREN 2C2189

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ffARREN MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1995

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

"ARREN 221620

SR 17@ REEDY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE: ,30 MANAGER: D. GRIFFITH

CONG DIST,- 11
GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS 221575 IS AN ASSOCIATED PROJECT.

PE 1992 ROff NONE CONST

UNDERWAY

$

0

AFTER 96

ffARREN 222390

SR 16 OVER GOLDEN CREEK IN WARRENTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: ,DO MANAGER:

CONG DIST, 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHffAY ADHIN FUNDS

PE 1994 ROW 1996
CONST

$

10

$

1

AFTER 96

~

"'

., ,..,

~

~

~ ~ lzf'~

t

,,.

~

~ID~U!

li~.1:~

o~ ,,-w.;tl

~~ ~

i:!~J~~

.~i::~$~~

~,:,;::,~,~

. ..

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 327

COUNTY

DESCRIPTION

FISCAL .. COST

P, I.NO,

PROJECT DATA

COMMENTS

YEAR

1!:STS

WASRINGT COUNTY OPERATED PUBLIC TRANSIT -SE-R--V-IC-E-----------------------------------------------------------------------------------

281503 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 11

FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH

OPERATING 1994 $

32

FUND SOURCE: RURAL TRANSIT

FED SHAAE $

19

FEDERAL TRANSIT AOHIN FUNDS

GA, SHARE$

0TH SRAAE $

13

WASHINGT COUNTY OPERATED PUBLIC TRANSIT SERVICE 281504 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1995 $

40

FUND SOURCE: RURAL TRANSIT

FED SAME$

23

FEDERAL TRANSIT AOHIN FUNDS

GA. SHARE$

OTR SHARE$

17

WASRINGT COUNTY OPERATED PUBLIC TRANSIT SERVICE 281505 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1996 $

n

FUND SOURCE: RURAL TRANSIT

. FED SHARE $

27

FEDERAL TRANSIT AOHIN FUNDS

GA. SHARE$

OTR SHARI!!$

20

WASHINGT ONI!: CONVERSION VAN, ONE H081LI!: RADIO ANO ONE BASE STATION
2C2503 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1994

$

38

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

FED SHARE$ GA. SHME $ 0TH SHARE$

30

WASHINGT ONI!: STANDARD VAN AND ONE MOBILE RADIO 2C2504 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT AOHIN FUNDS

GA. SHME $

2

OTR SHARE$

2

WASRINGT ONE STANDARD VAN AND ONE MOBILE RADIO
2C2505 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1996

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADHIN FUNDS

GA. SHME $

2

0TH SHARE$

2

WASHINGT SR 15: NB HP 28.1-29.6/WASHINGTON//SB HP 1.0-2.5/RANCOCK
222300 AODITION'OF A PASSING LANE. PROJECT MILEAGE : 3,00 MANAGER: D. GRIFFITH

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOHIN FUNDS

PE 1995 ROW CONST

$

45

AFTER 96

AFTER 96

r.F:nnr; I 11 l"'F:P 1111TMF:IIT OF TIU\IISPO!lTIIT JON

16-Sep-1993

STIITE TRJ\IISPORTATION IMPROVEMENTS PROGRAM

Page J28

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

W--A-S-R-IN-G-T--C-R---3-57--A--T-S-T-E-E-L---C-R-E-E-~--S-O-U-T-H--O-F--D-A-V-I-S-B-O-R-O-----------------------------------------------------------------P-E---1-9-9-6--~-$------6

242150 .REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDEO LANES,

CONG DIST. 11

ROW LOCL

PROJECT HILEA~E: ,20

CONST

AFTER 96

MANAGER! D. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY 1\DHIN FUNDS

. .. .

r,

.

' ...

-

~

~., . ~-- == .

~ ~ ~ ""== f~--:~~~ Mt$ i!;~:;:grJ ,;.!r,l~s!... ea.fa,~ ~frfui frc:~,;::~ :-.. .---~-:i

... ..

GEORGIA DEPARTMENT or TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 329

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

, COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

W-5-3A-1Y0-N9E-2----CR-R-EP-L-3A8-C8-/E-0M-D-EUN-H-T--oR-Dr--ST-OH-EU-T-EH-X@-I-S-TL-IINT-G-T-L-EB-R-SI-AD-TG-I-LE-LS-A(S--)C.-R-KN-O--A-D-D-E-D--L-A-N-E-S-.-----------C-O-N-G--D-I-S-T-.--1---------------------------R-OP-WE--1L-O9-8C-9L-----U-N-D-ER-W--AY

PROJECT MILEAGE: ,20

CONST 1994 $ 530

MANAGER! PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ Ut

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 106

0TH SHARE$

WAYNE 532t20

Sil 169 AT CR 392 NW or JESUP
INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,49 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: PETE BLOCKER

CONG DIST. l
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

10

ROW LOCL

CONST 1994 $ 2U

FED SHARE$ 218

GA. SHARE$

2t

0TH SHARE$

(

r.r,nn,; I II (lEPI\RTMENT Or TRJ\Jl;,PORTI\T 1011 STI\TE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 330

W-3CP-2EO2-,BIU6-S.N0T-NET0-OYR--. -PRS-RRE-PO-L2-JAE7-CC/-UET-MS-ME-N2-ILT8-E0-AO-GO-FEDP-VR-TEEHR-OS:-ECJE-CR.oC-HEIoT-POXT-CII-SDTOT-AON-ITHNA-AG-T-C-BR-ER-EI-DCGREE-ES-K(-$-)-, --NO---A-D-D-ED---L-A-N-E-S-.-----------C-O-N-G--D-CI-OS-MT-M.--E2N-T-S------------------------C-O-RNO-FPSWE-ITYS-ECA-11A-R99L-9946---A$$-CEF-TSO-ETSR-ST--9160l

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

... .. .,

.- ...

.. .,,

,

-

~

~. ---~

~

~

~

~ I&,-=-=

A.!!1.J.f.t!

IH~ ,,~. zi llii:~'ri~ 'C':.,:.

~ .. ;~;Ji

1~:.::~,:-~

COUNTY P,l,NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT or TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT-LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

WHEELER 581323

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

WHEELER 5B1324

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

WHEELER 581325

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH

CONG DIST. 8

FUND SOURCE: RURAL TRANSIT

l

FEDERAL TRANSIT ADMIN FUNDS

WHEELER 5C2323

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

WHEELER 5C2324

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FED.ERAL TRANSIT ADMIN FUNDS

WHEELER 522110

SR 30@ ALLIGATOR CREER
REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE: .15 MANAGER: PETE BLOCKER

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

WHEELER 531250

REPLACE TRUSS.SECTION@ OCONEE RIVER ON SR.46
REPLACEMENT or THE EXISTING BRIDGES(SI. NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER: PETE BLOCKER

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

... ""

16-Sep-1993 Page 331

FISCAL

COST

YEAR

ESTS

-----------------

OPERATING 1994 $

23

FED SHARE$

14

GA. SHARE$

0TH SHARE$

9

OPERATING 1995 $

36

FED SHARE$

21

GA. SHARE$

0TH SHARE$

15

OPERATING 1996 $

38

FED SHARE$

22

GA. SHARE$

0TH SHARE$

16

CAPITAL 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

- 31
25 3 3

CAPITAL 1995

$

29

FED SHARE$

23

GA. SHARE$

3

0TH SHARE$

3

PE 1992 UNDEP."AY

ROW 1994 $

5

CONST 1994 $ 1350

FED SHARE $ 1080

GA. SHARE $ 270

0TH SHARE $

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1994 $ 800

FED SHARE $ 640

. GA. SHARE $

160

0TH SHARE $

~E0P~TA nEPARTMENT or TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 332

---- COUNTY
P.I.NO. WHITE

SR

17

FM

Sor

DESCRIPTION PROJECT DATA
SR 356 TON OF

SR

FISCAL

COST

7-5--A--L-T----------------------------------C-O-M-M-E-N-T-S--------------------------P-EY-E-AN-RO-N-E---.$ESTS

O

121740 TURN LANES/ TRAFFIC

CONG DIST. 9

ROW 1990 UNDERWAY

PROJECT MILEAGE: .35 - EXIST. LANES1 2 /PROPOSED LANES: 3

CONST 1995 $ 392

MANAGER: L. ONENS

FUND SOURCE: HWY. SAFETY

.FED SHARE$ 353

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$

39

0TH SHARE$

WHITE 12224X

SR 11/US 129 FM SR 284/HALL TO CLEVELAND BYP .. SEE HALL CO RECONSTRUCTION' WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE: .OO MANAGER: UNKNOWN

WHITE 162390

r
CLEVELAND WEST BYP FM SR 115 W/CLEVELAND-SR 11 @HULSEY RD CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE: 1.80 MANAGER! RON BRAZIEL (M)

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 122240 IS AN ASSOCIATED PROJECT.

PE 1992 ROW
CONST

UNDERWAY AFTER 96
AFTER 96

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

90

:AFTER 96

WHITE 170880

CR 31/TOM TEAQUE. RD@ MOSSY CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. PROJECT MILEAGE: .20 MANAGER: L. ONENS

WHITE 1'70881

CS 613/LORELY RD OVER CHATTAHOOCHEE RIVER IN HELEN REPLACEMENT OF THE EXISTING BRIDGES(S). FROM l TO 2 LANES.
PROJECT MILEAGE I .19 MANAGER! L. ONENS

CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1994. $ 166

FED SHARP.:'$ GA. SRAAE $

133 33.

0TH SRA.RE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1994 $ 306

FED SHARE$ 245

GA. SHARE$

61

0TH SHARE$

... ..

t

~:

-. C. .....

-

\BB

~",

.

we
.

.

~

= ~

~

~

~ ~

~

~-.;._ lie~~

~~~~~i

tt;~~~r"~

i::': :::,

i:

.

,,

GF.ORGIA DEPARTMENT-or TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 333

COUNTY

DESCRfPTION

FISCAL . COST

P,I.NO,

PROJECT DATA

COMMENTS

YEAR . ESTS

W-H-I-T-F-IE-L--C-O-U-N-T-Y--O--P-E-IU-\-T-E-O---P-U-B-L-t-C--T-R-A-N-S-I-T--S-E-R-V-I-C-E------------------------------------------------------------------------------------

6B1388 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: WHITFIELD MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

OPERATING 1994 $ 171 FED SHAAE $ 103 GA. SHARE$

0TH SHARE$

69

WHITFIEL COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1399 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT! WHITFIELD MANAGER! STEVE KISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ 176

FED SHARE$ 106

GA. SHARE$

0TH SHARE$

70

WHITFIEL COUNTY OPEIU\TED PUBLIC TRANSIT SERVICE 6B1390 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WHITFIELD MANAGER! STEVE KISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996 $ 195

FED SHARE$ 111

GA. SHAAE $

0TH SHARE$

74

WHITFIEL THREE CONVERSION VANS (1 NITA A LIFT) 6C2399 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WHITFIELD
MANAGER! STEVE KISH

CONG DIST. 9

CAPITAL 1994

$ as

FUND SOURCE: RURAL TRANSIT

FED SHARE$

69

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

9

0TH SHARE$

9

WHITFIEL ONE CONVERSION VAN AND ONE STANDARD VAN
6C2399 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WHITFIELD MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1995

$

49

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

39

GA, SHARE$

s

0TH SHARE$

s

WHITFil!:L I-75 , SR 3 CONN FM CR 91. I!: TO DUG GAP RD E/I-75 610690 INTl!:RCHANGE / RECST. OR REHM.
PROJECT MILEAGE: ,39 - EXIST. LANES: 2 /PROPOSED LANES: 6
MANAGER: IU\Y METTS (C)

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1995 $ 100 CONST 1995 $ 2529
FED SHARE $ 2022 GA. SHARE $ 506 0TH SHARE $

WHITFIEL I-75@ SR 3/US 41/ROCRY FACE EXIT 610760 INTERCHANGE/ RECST. OR REHM.
PROJECT MILEAGE: .53 - EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: RON BRAZIEL (H)

CONG DIST. 9
FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 RON CONST

$ 250 AFTER 96 AFTER 96

COUNTY P. I.NO,

DSCRIPTION PROJECT DATA

r.r.i,p_r.JI\ r,r.rl\RTME"'T OF TRAtlSrORTI\TION STI\TE TRANSPORTI\TION IMPROVEMENTS PROGRJ\H
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

WRITFl!L I-75 RAMP AT SR 201 ,10900 1tAMP / RECST, OR REHAB.
PROJECT MILEAGE: ,00 - EXIST. LANES: 6 /PROPOSED LANES: 6 MANAGER: RAY METTS

CONG DIST. 9
FUND SOURCE: I-STATE HAINT, FEDERAL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 334

FISCAL

COST

YEAR

. ESTS

P-E---1-9-9-6-----$--.----4

ROW

AFTER 96

CONST

AFTER 96

WRITFIEL SR 3/US 41: FM SR 3 CONN NE TO WALNUT AVE IN DALTON 620630 RECONSTRUCTION' WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE: 5,19 MANAGER! RON BRAZIEL (H)

CONG D1ST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

WHITFIEL SR 3/US 41 FH N OF STONECREST ORN TO CR 306/TUNNEL HILL 620960 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: 2.90 . MANAGER! RON BRA!IEL
WHITFIEL SR 71 FM CR 228/WILLIAHS ROTON or CR 213/677
620970 RECONSTRUCTION ,wIOENING FROM 2 LANES TO 5 LANES, PROJECT MILEAGE: 4,30 MANAGER: J, GRAYBEAL(M)

CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 6246
FED SHARE$ 4997
GA. SHARE$ 1249 0TH SHARE$

PE 1992 ROW 1993 CONST

UNDERWAY UNDERWAY AFTER 96

lfflITFIEL SR 71 FM N OF CR 213/677 NORTHERLY TO CR 19/COHUTTA 620975 RECONSTRUCTION' WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE I 4,10 MANAGER: J. GRAYBEAL

CONG DIST. 9
FUND.SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1993 CONST

UNDERWAY UNDERWAY AFTER 96

WHITFIEL SR 71 FH NORTH BYPASS N TO DAWNVILLE RD '621290 RECONSTRUCTION, WIDENING FROM 5 LANES TO 6 LANES.
PROJECT MILEAGE: 1.32 MANAGER: H GANNAWAY

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 4479 AFTER 96

WltITFIEL SR 52 FH SR 52 BUS TO CR 112 /DALTON BYP [' BR @ HILL CK) 621300 RECONSTRUCTION, WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : .65 MANAGER: BILL_HCVEY

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 1439
FED SHARE $ 1151 GA. SHARE $ 288 0TH SHARE $

" ...

fl

~

' ....

-

llll!!!!l

I

~ .,,

_f@!I
-

~

~

~

~

~

me,

~~J.~ K@.'!l:~

.to

'Q_

~;ij

,~~i~~

f:,----'-:i:)

.

''-"

GEORGIA DEPARTHENT-OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 335

COUNTY

DESCRIPTION

FISCAL

COST

P, I ,NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

W--H-I-T-F-IE-L---SR---52---FM---1---7-5--TO---S-R--3-/U--S--4-1------------------------------------------------------------------------------P-E--1-9-9-6-----$------85

621800 RECONSTRUCTION, WIDENING. NO LANE ADDITION PROPOSED,

CONG DIST. 9

ROW

AFTER 96

PROJECT MILEAGE: 1.90

-

CONST

AFTER 96

MANAGER! BILL MCVEY (M)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADHIN FUNDS

WHITFIEL CR 664/AIRPORT RD FM TIBBS BR RD TO HURRAY CO LINE 631065 RECONSTRUCTION, "IDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE I 4.60 MANAGER! BILL MCVEY (H)

CONG DIST, 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW LOCL
CONST

UNDER"AY AFTER 96

"RITFIEL SR 201 EB HP 13.6-14.9: NB HP 14.6-15.51 NB 17-I9;RTL@ SR 2 631250 ADDITION OF A PASSING LANE.
PROJECT MILEAGE: 3.40 MANAGER: BILL MCVEY (H)

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1992 ROW 1996
CONST

UNDER"AY

$

276

AFTER 96

WHITFIEL SR-3; 7 CULVERT EXTENSIONS FM HP 0.19 TO HP 5.36 631390 BRIDGES/ TRAFFIC
PROJECT MILEAGE: 5.19 MANAGER: BILL MCVEY
WHITFIEL CR 664/AIIU'ORT RD FM TIBBS BRIDGE RD NW TO SR 52 650390 RECONSTRUCTION, WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: ,90 MANAGER: BILL MCVEY
WHITFIEL PEDESTRIAN/BIKE PATHS ANO LANDSCAPING IN DALTON 670990 BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST, 9 FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADHIN FUNDS
CONG DIST, 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHNAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADHIN FUNDS

PE 1993 UNDERWAY

ROW 1995 $

32

CONST '1996 $ 470

FED SHARE$ 423

GA. SHARE$

47

OTR SHARE$

PE 1992 UNDERWAY
ROW LOCL CONST 1995 $ 806
FED SHARE$ 645 GA. SHARE$ 161 0TH SHARE$

PE 1996 $

59

ROW 1996 $ 198

CONST 1996 $ 480

FED SHARE$ 384

GA. SHARE$

50

0TH SHARE$ 146

~Enn~tl\ nErl\RTHENT OF TPI\NsrnRTI\TTON STI\TE TRMlSrORTI\TION IMPROVEHEIITS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 336

COUNTY

DESCRIPTION

FISCAL

COST

P I. NO.

PRO.Te:CT DATA

COMMENTS

YEAR

ESTS

WILCOX COUNTY OPERATED PUBLIC TRANSIT SER-V--IC-E-----------------------------------------------------------------------------------

4B1278 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 8

FUNDS RECIPIENT: NILCOX MANAGER: STEVE KISH

OPERATING 1994 $

38

FUND SOURCE: RURAL TRANSIT

FED SRA.RE$

23

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

15

WILCOX 4B1279

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: NILCOX MANAGER! STEVE KISH

CONG DIST. 8.

OPERATING 1995 $

40

FUND SOURCE: RURAL TRANSIT

FED SHARE$

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SRA.RE$

0TH SHARE$

16

WILCOX 4Bl280

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: "ILCOX MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1996

$

42

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

17

WILCOX 4C2278

TWO MOBILE RADIOS AND ONE MOBILE RADIO BASE STATION
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILCOX MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1994

$

' 7

FED SHARE$

6

GA. SHARE $

0TH SHARE$

1

WILCOX 4C2279

ONE CONVERSION VAN "ITH LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: NILCOX MANAGER: STEVE KISH

CONG DIST. 8

CAPITAL 1995

$

33

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$ GA. SHARE$ 0TH SHARE$

26 3

WILCOX 421962

SR 11/US 129@ FOLSOM CRK:CEDAR CRR;CEDAR CRK OLFW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE: 1.00 MANAGER: J, LINDSEY

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDER"AY

ROW 1994 $

3

CONST 1995 $ 1274

FED SHARE $ 1019

GA. SHARE $ 255

0TH SHARE $

WILCOX 422080

SR 30 EB FH HP 14.5-16.0;WB HP 12.3-13.5
ADDITION OF A PASSING LANE. PROJECT MILEAGE: 2,70 MANAGER: J. LINDSEY '

CONG DIST, 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW 1993 UNDERWAY

CONST 1995

$

844

FED SHARE $ n5

GA. SHARE $ 169

0TH SHARE $

..

" r

r,.

,;

' ""'

-

ll!!!W!I

. .. ~ .~

~

~

~ = m

,~ ,::.z,:;-.lll

~

!@:.~

== = ~,~~
"' ~

~~;~

\?:;: ,;;l

!~"'._.:,,:.;nf

/:.>

.

,;;;;.

GEORGIA DEPARTHENT-or TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 337

COUNTY

DESCRIPTION

FISCAL .COST

P,I.NO,

PROJECT DATA

COHHENTS

YEAR

BSTS

W--IL-C-O-X----S-R---30-/-U-S---2-8-0-: ---O-V-E-R--H-I-L-L--C-R-E-E-~--W-E-S-T--o-r--R-O-C-H-E-L-L-E----------------------------------------------------------P-B--1-9-9-5-----$------10

422310 REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST, 8

ROW

AFTER 96

PROJECT MILEAGE: ,00

CONST

AFTER 96

HANAGERI

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADHIN FUNDS

WILCOX 431310

SR 11/US 129: OVER CEDAR CREE~ OVERFLOW REPLACEMENT or THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: ,00 MANAGER!

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADHIN FUNDS

PB 1995 ROW CONST

$

10

AFTER 96

AFTER 96

WILCOX SR 11 FM c,G 8 BUSH ST, FITZGERALD.TO c,o 8 ABBE'LE/BEN RILL

PB NONE $

0

43136X SHOULDER WOM / MAINTENANCE

CONG DIST. 8

ROW NONE $

0

PROJECT MILEAGE: 20.06 - EXIST, LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER! UNKNOWN

FUND SOURCE: SURFACE TRANSPORT,

FED SHARE$

FEDERAL HIGHWAY ADHIN FUNDS

GA, SHARE$

0TH SHARE$

'

COUNTY P, I ,NO,

DESCRIPTION PROJECT DATA

r,F.ORr,IA OEPARTMENT OF TRJ\NSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

WIUES 281193

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WILUS MANAGER: STEVE KISH

CONG DIST, 10, 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

WILKES 281194

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WILUS MANAGER: STEVE KISH

(_
CONG DIST. 10, 11 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

WILKES 281195

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WILUS .
MANAGER: STEVE KISH

CONG DIST. 10, 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

WILKES 2C2193

ONE STANDARD VAN
TRANSIT FACILITIES/ CAPITAL_ FUNDS RECIPIENT: WILMS MANAGER: STEVE KISH

CONG DIST, 10, 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

WILKES 2C2194

ONE STANDARD VAN
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILUS MANAGER: STEVE KISH

CONG DIST, 10, 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

WILKES 2C2195

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILKES MANAGER: STEVE KISH

CONG DIST. 10 ., 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADHIN FUNDS

WILKES 270960

REVITALIZATION/LANDSCAPE HISTORIC DIST IN WASHINGTON LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 11, 10
FUND SOURCE: TRANS. ENHANCE. 'FEDERAL HIGHWAY ADHIN FUNDS

16-Sep-1993 Page 338

FISCAL YEAR

COST .. ESTS

. ---------

OPERATING 1994 $

so

FED SHARE$

30

GA, SHARE$

0TH SHARE$

21

OPERATING 1995 $

53

FED SHARE$

31

GA, SHARE$

OTR SHARE$

22

OPERATING 1996 $

55

FED SHARE$

32

GA. SHARE$

0TH SHARE$

23

CAPITAL 1994

$

20

FED SHARE$

1fi

GA. SHARE$

2

0TH SHARE$

2

CAPITAL 1995

$

20

FED SHARE$

u

GA. SHARE$

2

0TH SHARE$

2

CAPITAL 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

PE LOCL
ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$ 0TH SHARE$

32 26
3 3
0 581 465
65 181

,c,.

~

F,

..

;e::,.

- - . - - . = F) .. ~'~ ._

~

ws::rre

~

~

~

-~- t,;:)!LJ ~

l~:fJ::;;

,r,~;;-~

t.-,-,";.,.'

.~-~ ....

'.,ii_;;,'

GEORGIA DEPARTMENT or TMNSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAH PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page JJ9

COUNTY

DESCRIPTION

FISCAL

.COST

P,I,NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

W-I-L-~I-N-S-O--C-O-U-N-T-Y--O-P-E-R-A-T-E-D--P-U--B-L-IC---T-R-A-N-S-I-T--S-E-R-V-I-C-E----------------------------------------------------------------------------------

281198

TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WIL~INSON MANAGER: STEVE RISR

CONG DIST. 11

OPERATING 1994 $

22

FUND SOURCE: 0 RURAL TRANSIT

FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA, SHARE$

OTR SHARE$

9

WIL~INSO COUNTY OPERATED 1PUBLIC TRANSIT SERVICE 2Bll99 TRANSIT FACILITIES/ OPERATIONS
FUNDS MCIPIENT: WILKINSON MANAGER! STEVE RISH

CONG DIST, 11

OPERATING 1995 $

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

19

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

OTR SHARE$

14

WILRINSO COUNTY OPERATED PUBLIC TRANSIT SERVICE 281200 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WILKINSON MANAGER: STEVE RISH

CONG DIST. 11

OPERATING 1996 $

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

19

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

WIL~INSO ONE STANOA.JU) VAN AND ONE MOBILE RADIO

2C2199 TRANSIT FACILITIES/ CAPITAL

FUNDS RECIPIENT: WILKINSON

MANAGER: STEVE RISH

.

'
WILRINSO ONE CONVERSION VAN WITH LIFT ANO ONE MOBILE RADIO 2C2199 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WILKINSON MANAGER: STEVE RISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1994

$.

21

FED SRA.RI!:$

17

GA. SHARE$

2

OTR SHARE$

2

CONG DIST. 11

CAPITAL 1995

$

33

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SR.ARE$ GA. SHARE$ OTR SHARI!:$

26 3

WILRINSO us 441@ BIG SANDY CREER Sor IRWINTON
221762 REPLACEMENT OF TRE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS

CONG DIST; 11
GRIP. PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221760 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1994 CONST

UNDERWAY

$

6

AFTER 96

WILRINSO US 441@ SOUTHERN RR' COMMISSIONERS CRR/HCtNTYRE 221764 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .00 MANAGER: H. REYNOLDS

CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221760 IS AN ASSOCIATED PROJECT.

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

~EORGIA PErAnTMENT OF TRAN~ronTATION STATE TRAtlSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 340

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

------- P,1.NO,

PROJECT DATA

COMMENTS

YEM

ESTS.

W--!-L-K-!N-S-O---SR---2-9-/U-S---4-4-1-@---B-LA-C-K---C-R-E-EK--------------------------------------------------------------------------------P-E--1-9-9-2--- UNDERWAY

221935 REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES,

CONG DIST. 11

ROW NONE $

0

PROJECT MILEAGE: ,00
HANA~ERr H. REYNOLDS

GRIP PROJECT
FUND SOURCE: BRIDGE PROGRAM

CONST 1995 $ 161 FED SH.ARE$ 129

FEDERAL HIGHWAY ADHIN FUNDS

GA, SH.ARE$

32

221930 IS .AN ASSOCIATED PROJECT.

0TH SKARE$

f .

.'"'-l' ,

'"' '~ ~

, -

(:!la----.

il!IWII

.. . 1'!1!11!!!!!1!! - ~..:.:--..:~<; ~ ~ "

~

~

~g

Mt!!

i:tt.:s~

!"W:&i~:

.

~:):~:rJi
;

r.4<:.:iu

?~~ti~l

{:;;--~,-~")

:':

- .'-.,;_ '-- -~~

GEORGIA DEP~RTHENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993
Page 341

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

Dl':SCIHPTION .

FISCAL

"COST

P,t.NO.

PROJECT DATA

COMMENTS

YEAR

EST9

W--O-R-TH-----C-R---1-60--N-E--O--F--D-O-E-R-U-N-@---O-C-H-L-O-C-~-O-N-E-E--R-I-V-E-R------------------------------------------------------------------P-E--1-9-9-4-----$------1'

431120 REPLACEMENT OF THE EXISTING BRIDGl':S(S), NO ADDED LANES,

CONG DIST, 8

ROW LOCL

PROJECT MILl':AGE: .50

CONST

AFTER 96

MANAGER: J, LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

WORTR 470890

CR 164/ELH STREET OVER WARRIOR CREE~ IN POULAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : 1.00 MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 251

FED SHARE$ 201

GA. SHARE$

50

0TH SHARE$

(

,f! t
;1,
,,,:"!-