l'l'\4/llTATEWIDE
--r- -,. TRANSPORTATION
'7l -IMPROVEMENT PROGRAM
I
Georgia Department of l'ransportation
Fiscal Years
1994 1995 1996
i
i
i
I
!
-~ ~1 jj.
.
?, .
'
i
';
INTRODUCTION
The Statewide Transportation Improvement Program (STIP) is developed to comply with the provisions of the Intermodal Surface Transportation Efficiency Act of 1991 (!STEA). The STIP contains Federal Aid projects programmed for Fiscal Years 1994, 1995 and 1996. The projects have been identified through the planning process and represent transportation needs statewide.
The STIP includes Highway and Bridge, Bicycle,. Pedestrian, Transportation Enhancement, and Public Transportation (transit) projects. Phases of projects, also referred to as projectrelated activities, such as PE (Preliminary Engineering), ROW (Right of Way) and CONST (Construction) are given for highways, and capital and operating for transit. The projects are organized by County and by mode of transportation. The STIP format has been standardized with the same information for each project.
The STIP is a federal requirement for receipt of Federal Highway
Administration and Federal Transit Administration funds. The
STIP must be fiscally balanced. Projects and phases of projects
listed must only include those for which there is funding
available or for which there is a reasonable expectation of
obtaining funds. Federal funds for Fiscal Years 1994, 1995 and
I
1996 are program estimates and will not be final until after the
federal budget is approved by October 1 of each year.
The STIP is a cooperative effort between local governments, the Metropolitan Planning Organizations, lead agencies for urban area planning, and the Georgia Department of Transportation. The Metropolitan Planning Organizations, through the urban area planning process, have identified local transportation needs in urban area Transportation Improvement Programs. The urban area projects are included in the STIP along with rural area projects identified by the Department 1n consultation with local governments.
The three year Statewide Transportation Improvement Program
includes nearly 1,600 projects totaling $2.6 billion in federal,
f;
state and local funds. Projects funded with !STEA Title I
Ii
(highway) funds make up 69% of the project-related activities and. 83% of the funding; projects funded with !STEA Title III
(transit) funds represent 31% of the projects and 17% of the
expenditures.
Reconstruction and rehabilitation of existing highways and bridges account for 38% of the STIP funding. The next highest category of programmed STIP spending for highways is new construction - approximately 14% of the total. Maintenance represents 13.7% of the program.
,
D
Public Transportation projects make up 31% of projects in the STIP - capital purchases and operating ass1stance are the major activities. Public transportation program funds are used for purchase of vehicles and other transit equipment.
The Statewide Transportation Improvement Program places emphasis
on maintaining and improving the existing highways, bridges, and
public transportation equipment. The public transportation
program expenditures focuses on replacement of vehicles and
.L
other operating equipment as a means of improving public transit
operations, safety, and meeting the requirements of the
Americans with Disabilities Act. Figures 1 and 2 depict the
number of projects and amount of funding for the three year
period. Fiscal Years 1994, 1995, and 1996.
The Georgia Department of Transportation is pleased to make -this
document available. We welcome any comments on the STIP; please send your comments to:
H!
ii iii
Georgia Department of Transportation
&
Office of Planning
i
No. 2 Capitol Square
M
Atlanta, Georgia 30334
!.
i
Att: Marta V. Rosen
i
(404) 656-5725
I I
rt Ct
GLOSSARY OF ACRONYMS AND ABBREVIATIONS
FOND SOURCE:
\t
CATFX;ORIES OF FEDERAL HIGHWAY ACT (FHWA) FUNDING
CONG MIT./AIR QUAL - Congestion Mitigation/, Air Quality FED. LANDS - Federal Lands HWY. SAFETY - Highway Safety I-STATE MAINT. - Interstate Maintenance I-STATE CONST. - Interstate Construction NAT'L HIGHWAY - National Highway System OLD URBAN SYSTEM - funds allocated to Georgia before ISTEA SURFACE TRANSPORT. - Surface Transportation Program TRANS. ENHANCE. - Transportation Enhancement Assistance
CATFX;ORIES OF FEDERAL TRANSIT ACT (FTA) FUNDING
:r:
URBAN TRANSIT DISC. - Discretionary assistance
!
awarded on a competitive basis by the FTA; ADA or
CAA indicates Americans with Disabilities Act
"
project or Clean Air Act project .
URBAN TRANSIT - Urban Area assistance - can be
capital or operating funds; ADA or CAA indicates
l
Americans with Disabilities Act project or Clean
Air Act project.
ELDERLY & DISABLED - Assistance for Elderly and
Handicapped capital projects.
RURAL TRANSIT - Rural Area assistance - can be
capital or operating funds.
OTHER ACRONYMS/ ABBREVIATIONS
BR - Bridge
CONG DIST. - Congressional District
CONST - Construction
CS - City Street
CR - County Road
CWP
Construction Work Program. The
Construction Work Program includes projects in
two phases Phase I (first three years of the
Program) and Phase II (next three years of the
Program). The STIP is derived from Phase I
projects.
FED SHARE - Federal Share of the cost of the
project
FM - Indicates from
GA. SHARE - Georgia Share of the cost of the
project
HOV LANES
High Occupancy Vehicle lanes;
I
1
designated lanes used exclusively for multiple-occupancy vehicles.
INT - Intersection, usually seen as smith Road
Int Jones Street.
LGPA - Local Government Project Agreement. These
agreements outline highway and bridge project
responsibilities between the GDOT and the local
government. The status line will indicate if an
agreement has been requested, signed or refused
(a signed or refused agreement would have the
date of the transaction noted on the project
description). Most LGPA address sharing
responsibilities for right of way, utilities or
detours.
LOC SHARE - Local Share of the cost of the
project
N, S, E, W - North, South, East, West. May
also be used in combinations of NE, SW etc.
NB, SB, EB, WB - North Bound, South Bound, East
Bound,. West Bound indicating direction of
movement. Sometimes will be shown as NBL, SBL,
EBL or WBL to indicate North Bound Lane, South
Bound Lane, East Bound Lane or West Bound Lane.
B OR BU OR BUS - Business Route
...
BYP - Bypass or Circumferential Route CONN - Connector
EXT - Extension
FRNTG - Frontage
NOISE BARR. - Noise Barrier
PE - Preliminary Engineering indicates an early
phase of project development that may include
surveys, design, environment.al and other work
done in project development.
P.I. NO. - Program Item Number is unique to each
project.
PKWY -Parkway
RECST. OR REHAB.
Reconstruction or
Rehabilitation
RTL OR LTL - Right Turn Lane or Left Turn Lane
R/W or ROW - Right of Way
SR - State Route
T&S PROJECT - Traffic and Safety Project
TIP
Transportation Improvement Program
developed by the Metropolitan Planning
Organizations
UTL OR UTIL - Utilities
EIE i
I
n
-~
l~ liill1lillilll
- ' ~ -
~
~
_ 1 ~ W
~ -
~ -.,:.. .t--i
~ . 1.~t"i--1.~
\lf},o/.1!ffl .
-
1!1>"-W
-==...i. fll .
-~-= lllil
-
l"-'''-0
......_
,.;,o,cc.c-,,
f.+.,;}~'
'', '
i'~c'"...
i'' ,,.,..,-_
.
:,- ._;,
STATEWIDE FUNDS DISTRIBUTION
FEDERAL_AID PROJECTS(FY-1994-1996)
COUNT OF PROJECTS
OTHER
24
PUBLIC TRANSIT
491
NEW CONSTRUCT . 64
ENHANCEMENT 71
RECST/REHAB
410
SAFETY
207
MAINTENANCE BRIDGE REPLACEMENT 71
241
TOTAL= 1600
FIGURE 1
"
L
,1.'
~
., ... ~
~
~
'
~
~
~
f,.'f.:'!?,:?'1
Fl!,...!!!.~
., f'.f.i....~
~
;; \
~
~
~~~1
r~~--~:-:-1
. '-~.,:: ,,...,...
--~;_
~
,;
STATEWIDE FUNDS DISTRIBUTION
FEDERAL_AID PROJECTS(FY 1994-1996) -
PROJECT COST(MILLIONS $)
PUBLIC TRANSIT
OTHER
$453.1
r
$65.8
NEW CONSTRUCT
$365.2
RECST/REHAB $979.7
ENHANCEMENT $57.7
SAFETY $181.4
. MAINTENANCE BRIDGE REPLACEMENT $355.4
$149.6
TOTAL = 2.6 BILLION
FIGURE2
II
fflM
- ..... Ii!!@!! ~
-,:
,
'"
~
~ -~
~Jffl
fa!~!!
~~f!,
'
~
,~~ei
~~~ti
~
~
~'.'f:"'~
< ';-,
;.1}
i~ ,..,-~ . . .
. , "
i,.,.' ...
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 1
COUNTY
DESCRIPTION
P.I.NO.
PROJECT DATA
-------------------.
--
ALL
THREE CONVERSION VANS (2 WITH LIFTS); AND ONE STANDARD VAN
FISCAL
COST
---C-O-M--M-E-N-T-S ---------------------------Y-E-A-R --------E-S-T-S --
7C2512 TRANSIT FACILITIES/ CAPITAL
CONG DIST. 5
FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1994
$
109
FED SHARE$
87
GA. SHARE$
22
0TH SHARE$
ALL 7C2513
TWO CONVERSION VANS (1 WITH A LIFT); AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH
CONG DIST. 5
CAPITAL 1995
$
80
FUND SOURCE: RURAL TRANSIT
FED SHARE$
64
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
16
0TH SHARE$
ALL 7C2514
TWO CONVERSION VANS (1 WITH A LIFT); AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH
CONG DIST. 5
CAPITAL 1996
$
81
FUND SOURCE: RURAL TRANSIT
FED SHARE$
65
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
16
0TH SHARE$
ALL 8Vl010
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL 1994
$ 287
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
230
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
28
0TH SHARE$
29
ALL 8V1011
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA.
MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL 1995
$ 297
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
238
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
29
0TH SHARE$
30
ALL 8Vl012
ELDERLY AND DISABLED VEHICLES. AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL ,1996
$ 308
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
246
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
31
0TH SHARE$
31
ALL 8Vl013
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL 1994
$ 181
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
145
FEDERAL TRANSIT ADMIN.FUNDS
GA. SHARE$
18
0TH SHARE$
18
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATIO'. IMPROVEMENTS PROGRAM
Page 2
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
-FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
8Vl014 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 0
FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
CAPITAL 1995
$ 187
MANAGER: STEVE.KISH.
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 150
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
18
0TH SHARE$
19
ALL 8Vl015
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
MANAGER: STEVE KISH
.
CONG DIST. 0
CAPITAL 1996
$ 194
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
155
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
20
0TH SHARE$
19
ALL 8Vl016
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL, COUNTIES - SOUTH GA. MANAGER: STEVE KISH
CONG D.IST. 0
CAPITAL 1994
$ 205
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 164
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
21
0TH SHARE$
21
ALL 8Vl017
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL 1995
$ 212
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 170
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
21
0TH SHARE$
21
ALL 8Vl018
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH
CONG DIST. 0
CAPITAL 1996
$ 220
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 176
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
22
0TH SHARE$
22
ALL 044094
LUMP SUM MAINTENANCE FUNDED "0_4 4" FOR FY 19 9 4
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
2921 2629
292
ALL 044095
LUMP SUM MAINTENANCE FUNDED "044" FOR FY 1995
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL; STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
23862 21476
2386
- . V
...
ll_l.
..,
-
-
~ ~
,. a:- ..
~
~
~
me
~
~
. 6'!'.~.:.tli'=J
IL!~~
,.,.,~~
LK'.I:'/
1;.c "}i1
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
ALL 044096
LUMP SUM MAINTENANCE FUNDED "044" FOR FY 1996
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
. ~~~~ w;------~: ' ,
r''
16-Sep-1993 Page 3
FISCAL YEAR
COST ESTS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$ 0TH SHARE$
0
0
27778 25000
2778
ALL 04MB94
LUMP SUM BRIDGE PAINTING "04M" FOR FY 94
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
5064 4558
506
ALL 04MB95
LUMP SUM BRIDGE PAINTING "04M" FOR FY 95
BRIDGES/ MAINTENANCE .PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0 4444 4000
444
ALL 04MB96
LUMP suM BRIDGE PAINTING "04M" FOR FY 96
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$ 0TH SHARE$
0 0 4444
4000
444
ALL 315094
LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
27293 21834
5459
ALL 315095
LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
36500 29200
7300
ALL 315096
LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
36500 29200
7300
r
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 4
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
A--LL--------LU-M--P--SU-M---IN--ST-A--LL LO-G--O -- SIGNS ON NATIONAL -- HWY SYSTEM - 1994
--- -----------------------------4---------------------------
PE NONE $
0
315L94 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONG DIST. 99
ROW NONE $
0
CONST 1994 $ 100
MANAGER:
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
80
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE.$
20
0TH SHARE$
ALL 315L95
LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYS - 1995 sIGNING / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. -99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1995 $ 100
FED SHARE$
80
GA. SHARE$
20
0TH SHARE$
ALL 315L96
LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYSTEM - 1996 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
. ROW NONE $
0
CONST 1996 $ 100
FED SHARE$
80
GA. SHARE$
20
0TH SHARE$
ALL 315094
LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1994 LIGHTING/ MAINTENANCE PROJECT. MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1000 800 200
ALL 315095
LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1995
LIGHTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1000 800 200
ALL 315096
LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1996
LIGHTING / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1000 800 200
ALL 33A094
LUMP SUM SAFETY "OPTIONAL" FOR FY94 UNKNOWN/ TRAFFIC PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER
CONG DIST. 99
FUND-SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1060 954 106
~
'.,:
.
. ,....._ ..~
-
II!!!!!!
- - l!l~!!!l
"
~
~
~
~
~
f~
~
~
~
~
~
~~~
.t
I~;...,:~~:'.~
41',a
!-1.,., ...... ;....,:;1
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 5
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM SAFETY "OPTIONAL" FOR FY95
PE NONE $
0
33A095 UNKNOWN/ TRAFFIC
CONG DIST, 99
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1995
$
900
MANAGER: W HESTER
FUND SOURCE: HWY. SAFETY
FED SHARE$
810
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE.$
90
0TH SHARE$
ALL 33A096
LUMP SUM SAFETY "OPTIONAL" FOR FY96 UNKNOWN/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1996
$
900
FED SHARE$
810
GA. SHARE$
90
0TH SHARE$
ALL 33C094
LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
2500 2000
500
ALL 33C095
LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F
RIDING SURFACE .REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
2500 2000
500
ALL 33C096
LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
.
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
7500 6000 1500
ALL 33CB94
LUMP SUM BRIDGE PAINTING "33C" FOR FY 94
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $
CONST 1994 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1444 1155
289
ALL 33CB95
LUMP SUM BRIDGE PAINTING "33C" FOR FY 95
BRIDGES/ MAINTENANCE PROJECT MILEAGE : ,00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA; SHARE$ 0TH SHARE$
6
0
3750 3000
750
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 6
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
.A-L-L-------L-U-M-P--S-U-M--B-R-I-D-G-E--P-A-I-N-T-I-N-G--"-3-3-C-"--F-O-R--F-Y---96------------------------------------------------------------------P-E--N-O-N-E-----$------.o
33CB96 BRIDGES/ MAINTENANCE
CONG DIST. 99.
ROW NONE $
0
PROJECT MILEAGE : .00
CONST 1996 $ 3750
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 3000
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 750
0TH SHARE$
ALL 330094
LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 94
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 11329
9063 2266
ALL 330095
LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 95
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK
0
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1995 . $
FED SHARE$
GA. SHARE$
0TH -SHARE$
0 0 15000 12000 3000
ALL 330096
LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 96
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0. 0 11400 9120 2280
ALL 33DB94
LUMP SUM BRIDGE PAINTING "33D" FOR FY 94 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED. SHARE $
GA. SHARE$
0TH SHARE$
0 O 5000
4000 1000
ALL 33DB95
LUMP SUM BRIDGE PAINTING "33D" FOR FY 95 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE $
CONST1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 5000 4000 1000
ALL 33DB96
LUMP SUM BRIDGE PAINTING FOR "330" FOR FY 96 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE .$ ROW NONE $ CONST.1996 $
FED SHARE$
GJC SHARE $
0TH SHARE$
0 0 5000 4000
1000
...,
\a
....
f
-
l!IM
- . ll!IM '
MB
~
~
. ~ ~ ~ ~ ~tt~ ~~
GEORGIA DEPARTMENT OF TRANSPORTATION
~i~~
~c.:,Jii!.
..)>;>.~
. v,:--,;~
...;- ,:-~~--~
....... -.--~~
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 7
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM INSTALLATION OF LOGO SIGNS "1994"
PE NONE $
0
33DL94 SIGNING/ TRAFFIC
CONG DIST. 99
ROW NONE
$
0
PROJECT MILEAGE : .00 - EXIST. ~ES: 0 /PROPOSED LANES: 0
CONST 1994 $
50
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
40
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
10
0TH SHARE$
ALL 33DL95
LUMP SUM INSTALLATION OF LOGO SIGNS "1995" SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
PE NONE $
0
CONG DIST. 99
ROW NONE $
0
CONST 1995 $
50
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
40
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
10
0TH SHARE$
ALL 33DL96
LUMP SUM INSTALLATION OF LOGO SIGNS "1996"
SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:
PE NONE $
0
CONG DIST. 99
ROW NONE $
0
CONST 1996 $
50
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
40
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
10
0TH SHARE$
ALL 33MS94
LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 94
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE $
0TH SHARE$
0 0 2177 1959 218
ALL 33MS95
LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 95
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0. -
o
3400 3060
340
ALL 33MS96
LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 96
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER
CONG DIST. 99
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE, $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 3026 2723 303
ALL 33NS94
LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 94
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$ 0TH SHARE$
0 0 1300
1170 130
GEORGIA DEPARTME"'T OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
Page 8
COUNTY
DESCRIPTION
P. I.NO.
PROJECT DATA
----- - - - ALL
LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 95
33NS95 RR XING / TRAFFIC
FISCAL
COST
COMMENTS
YEAR
ESTS
-----------------------------------------------------------------
PE NONE $
0
CONG DIST. 99 '
ROW NONE $
0
PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0
CONST 1995
$
720
MANAGER: W HESTER
FUND .SOURCE: HWY. SAFETY
FED SHARE$
648
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
72
0TH SHARE$
ALL 33NS96
LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 96 RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 2488 2239 249
ALL 3AA094
LUMP SUM MAINT. FOR POP BET 5000-200,000 FOR FY 94
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L .- SEABROOK
.
FUND SOURGE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 12300 9840 2460
ALL 3AA095
LUMP SUM MAINT. FOR AREA POP BT SK - 200K FOR FY 1995
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99
PROJECT MILE}\.GE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
.
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 12500 10000
2500
ALL 3AA096
LUMP SUM MAINT. FOR AREA POP BET 5,000-200,000 FOR FY 96
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST, 99
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT .
. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 12500 10000
2500
ALL 3AAB94
LUMP SUM BRIDGE PAINTING "3AA" FOR FY 94
BRIDGES/ MAINTENANCE
J
PROJECT MILEAGE : .00
MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
617
FED SHARE$
494
GA. SHARE$
123
0TH SHARE$
ALL 3AAB95
LUMP SUM BRIDGE PAINTING "3AA" FOR FY 95
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE $
0TH SHARE$
0 0 6250 5000 1250
,..
,.
, ....
fflM
-
-"'
...
~
11M
l!llM
Mffl
~
I!!!!!'!!!
~
"
..11'!::tt:!liJ
~
~~;.~~
~~~
!,. .,...U
.,. . ~
I . . . . . _
--
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 9
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
LUMP SUM BRIDGE PAINTING "3AA" FOR FY 96
PE NONE $
0
3AAB96 BRIDGES/ MAINTENANCE
CONG DIST. 99
ROW NONE $
0
PROJECT MILEAGE : .00
CONST 1996 $ 6250
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT ..
FED SHARE$ 5000
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 1250
0TH SHARE$
ALL 770391
LUMP SUM -- 817 SIGNALS FOR METRO ATLANTA REMAINING FUNDING SIGNALS'/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
ATLANTA TIP t R 98
CONG DIST. 5 & 4
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
100
CONST 1996 $ 46985
FED SHARE $ 37588
GA. SHARE $ 9397
0TH SHARE $
ALL 770392
PE FOR METRO ATLANTA SIGNAL SYSTEM PROJECTS PRELIMINARY ENGINEERING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP t R 98
CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST NONE
UNDERWAY
$
0
$
0
ALL 811010
STUDY OF AUTOMATIC MOTOR-CARRIER CLEARANCE (ADVANTAGE I-75) SPECIAL STUDIES/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: I-STATE MA.INT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW NONE CONST NONE
$ 2200
$
0
$
0
ALL 811020
RURAL IVHS I-85, I-16, I-95, I-75 AND I-20 MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ALL 870000
FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1994 SPECIAL STUDIES/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 99 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 99 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW NONE
UNDERWAY
$ .
0
CONST 1994 $ 2310
FED SHARE $ 2310
GA. SHARE $
0TH SHARE $
PE 1994 ROW NONE CONST NONE
$ 3000
$
0
$
0
ALL 870010
FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1995 SPECIAL STUDIES/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 99
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW NONE CONST NONE
$ 3000
$
0
$
0
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 10
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ALL
FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1996
PE 1996 $ 3000
870020 SPECIAL STUDIES/ PLANNING
CONG DIST. 99
. ROW.NONE. $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE $
0
MANAGER:
FUND SOURCE: UNKNOWN
FEDERAL HIGHWAY ADMIN FUNDS
ALL 870030
\.
RAILROAD CROSSING ADVANCE WARNING SIGNS -- STATEWIDE
RR XING / TRAFFIC PROJECT MILEAGE : .00 -.EXIST. LANES:: 0 /PROPOSED LANES: 0 MANAGER: W HESTER
CONG DIST, 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ALL 870040
11 COVERED BRIDGES IN VARIOUS LOCATIONS STATEWIDE BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER:
, CON~ DIST, 10 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ALL 870050
GEORGIA DEPT. OF TRANS. HIGHWAY SIGNS MANAGEMENT SYSTEM SPECIAL STUDIES/ OTHER PROJECT MILEAGE :;.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
200
FED SHARE$ 180
GA. SHARE$
20
0TH SHARE$
PE 1994 $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
50
0
1000 800200
PE 1994
$
225
ROW NONE $
0
CONST NONE
$
0
I
,,....
. ,,
.
ia'
ffl!l1!IJ!!I
- -., ,. ~. ~
~
~
~
~
~!'.ll
a?X!~~~
~~
t............,,
/';-;-:"=:~~
~\'.~~
~
~
'
..r.:.:-:-;,:;:
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 11
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
----------------------------------------------------------------------------------------------------------------------------------
ATKINSON SR 31@ UNNAMED CRK
PE 1990 UNDERWAY
421440 REPLACEMENT OF THE EXISTING BRIDGES(S) .- NO ADDED LANES.
CONG DIST. 8
ROW 1991
UNDERWAY
PROJECT MILEAGE : .17
GRIP PROJECT
CONST
AFTER 96
MANAGER: UNKNOWN
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
(.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 12
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------------------------------------------------------------------------------------------------. ----------------------
BACON SR-32/ALMA@ HURRICANE CREEK
PE 1983 UNDERWAY
520910 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
CONG DIST. 1
ROW NONE
$
0
PROJECT MILEAGE : .65
CONST 1995
$ 1661
MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 1329
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
332
522125 IS AN ASSOCIATED PROJECT.
0TH SHARE $
BACON 522120
SR 32, EB MP 13.4-14.6; REALIGN SR 203@ SR 32 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.20 MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1994
$
12
CONST 1995
$
450
FED SHARE $ 360
GA. SHARE $
90
0TH SHARE $
BACON 522125
SR 32/ALMA FROM SR 4/PIERCE ST NE TO CR 323 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.10 MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 520910 IS AN ASSOCIATED PROJECT.
PE 1992
UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$ 1997
FED SHARE $ 1598
GA. SHARE $
399
0TH SHARE $
IV
,- .
, ~
, .
-
l!I!!!!!!!!
-~ ::; .
~
l!l!l!ilJi!!
~
~
l!!!l!!!!!
~
!!Mi~
I!!'-*-~
rrw.:;&i"~
~
~
.c:oii!'4 '
~...,"-'~!,.':1
!',f. ~-f''t"
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 13
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BALDWIN SR 22/24 RELOC FM CR 171 EAST TO SR 22/24 SPLIT
PE 1995 $ 168
222180 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
CONG DIST. 11
ROW
AFTER 96
PROJECT MILEAGE : 3.10
CONST
AFTER 96
MANAGER: H. ASHMORE
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
BALDWIN 231280
SR 22@ SR 29/US 441 IN MILLEDGEVILLE TURN LANES/ TRAFFIC PROJECT MILEAGE : ,28 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH
BALDWIN 241670
REMOVAL OF GA RAILROAD BRIDGE OVER US 441 BUSINESS
BRIDGES/ TRAFFIC PROJECT MILEAGE : .25 MANAGER: D. GRIFFITH
BALDWIN 270950
PRESERVATION OF HISTORIC DISTRICT IN MILLEDGEVILLE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 11 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 11 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 11 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
363
FED SHARE$
327
GA, SHARE$
36
0TH SHARE$
PE 1993 UNDERWAY
ROW 1994
$
2
CONST 1995 $ 142
FED SHARE $ 128
GA. SHARE $
14
0TH SHARE $
PE 1994 $
21
ROW 1994 $
44
CONST 1995 $
74
FED SHARE$
59
GA. SHARE$
13
0TH SHARE$
28
(
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 14
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
B-A-N-K-S-----C-O-U-N-T-Y--O--PE-R-A-T-E-D--P-U--B-L-IC---T-R-A-N-S-IT---S-E-R-V-IC--E------------------------------------------------------------------------------------
1Bl003 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 10
FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
OPERATING 1994 $
22
FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
9
BANKS 1Bl004
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1995 $
22
FUND SOURCE: RURAL TRANSIT
FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
9
BANKS 1Bl005
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH
CONG DIST. 10
c-
FUND SOURCE: RURAL TRANSIT
OPERATING 1996 $
24
FED SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
10
BANKS
I-85 SIGN MOD FM DEK CL TO SC STATE LN .. GWIN/JACKS/BAR/FRANK
PE NONE $
0
11044Y SIGNING/ MAINTENANCE
CONG DIST. 10 & 6
ROW NONE $
0
PROJECT MILEAGE : 76.00 ~EXIST.LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
110440 IS AN ASSOCIATED PROJECT.
0TH SHARE$
BANKS 1310.90
SR 51 FM THE SCHOOL NE TO SR 15/US 441
TURN LANES/ TRAFFIC. PROJECT MILEAGE : .43 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS
CONG DIST. 10
FUND.SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE . $
0
ROW 1994 $
1
CONST 1995 $ 190
FED SHARE$ 171
GA. - .SHARE $
1
0TH SHARE$
18
BANKS 141630
CR 132/LULA@ NORFOLK SOUTHERN RR/ID 717648N
RR XING. / TRAFFIC
PROJECT MILEAGE : .00 - EXIST, LANES: 2 /PROPOSED LANES: 2
MANAGER: W HESTER
.
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE ROW NONE CONST
$
0
$
0
AFTER 96
'
II
(I'(''
!J
"' ,..
l!l!l!!ll!!!!!l
-
l!!!!l!!l!!!! 11!!!!!!!!1!1
:.
~
~
~
~
~
~.,
~
~
ft.";!~~
/1:i::~j
r::::,:
.~~ '
. . 1--:-,.,........
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 15
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-BA-R-R-O-W-----I--8-5--S-I-G-N--M--OD---FM---D-E-R--C-L--T-O--S-C--S-T-A-T-E--L-N-.-.-JA--C-K-/B-A--N-K-S-/G-W-.N-/-F-R-A-N-K---------------------------------------------PE---N-O-N-E-----$------0
11044X SIGNING/ MAINTENANCE
CONG DIST. 10 & 6
ROW NONE $
0
PROJECT MILEAGE : 76,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
110440 IS AN ASSOCIATED PROJECT,
0TH SHARE$
BARROW 121730
WINDER BYP FM SR 8@ SR 11 NEARS CL NE TO SR 53@ SR 11 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 2.60 MANAGER: J. GRAYBEAL (M)
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
187
AFTER 96
BARROW 132220
SR 211@ CR 326/MP 17.5l;CR 61/MP 21.05;CHATEAU ELAN/MP 22.0 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. PROJECT MILEAGE : 1.26 MANAGER: L. OWENS
BARROW 170725
CR 75/FRED KILCREASE RD@ APALACHEE RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE : .15 MANAGER: L. OWENS
BARROW 170726
CR 228/ROSS RD@ BEECH CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .15 MANAGER: L, OWENS
BARROW 170728
CR 72/BROWNS BRIDGE RD@ APALACHEE RIVER SW OF AUBURN REPLACEMENT OF THE EXISTING BRIDGES(S), FROM 1 TO 2 LANES.
PROJECT MILEAGE : .20 MANAGER:
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY A!)MIN FUNDS
PE 1992 UNDERWAY
ROW 1995 $ 110
CONST 1996 $ 725
FED SHARE$
580
GA, SHARE$ 145
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1994
$
425
FED SHARE$
340
GA. SHARE$
85
0TH SHARE$
PE 1993 UNDERWAY ..
ROW LOCL
CONST 1994 $ 262
FED SHARE$
210
GA. SHARE$
52
0TH SHARE$
PE 1994 $
6
ROW LOCL
CONST 1996 $ 200
FED SHARE$
160
.GA, SHARE $
40
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 16
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY P, I.NO.
DESCRIPTION PROJECT DATA
BARTOW COUNTY OPERATED PUBLIC TRANSIT SERVICE
FISCAL
COST
-------------------------CO--M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
6B1328 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 7
FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $ 101
FED SHARE$
56
GA. SHARE$
0TH SHARE$
46
BARTOW 6B1329
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ 106
FED SHARE$
58
GA. SHARE$
0TH SHARE$
48
BARTOW 6B1330
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
110
FED SHARE$
61
GA. SHARE$
0TH SHARE$
50
BARTOW 6C2328
ONE CONVERSION VAN AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1994
$
48
FUND SOURCE: RURAL TRANSIT
FED SHARE$
38
FEDERAL TRANSIT ADMIN .FUNDS
. GA. SHARE $
5
0TH SHARE$
5
BARTOW 6C2329
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW
MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS
CAPITAL 1995
$
32
FED SHARE $",
26
GA. SHARE$
3
0TH SHARE$
3
BARTOW 6C2330
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW
MANAGER: STEVE KISH
CONG.DIST. 7
CAPITAL 1996
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
2
0TH SHARE$
2
BARTOW 610950
I-75 MILL AND INLAY FM US 411/SR61 TO SR 140
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 7
PROJECT MILEAGE : 12.10 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
.
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1994 $ 2220
FED SHARE $ 1998
GA. SHARE $ 222
0TH SHARE $
....
,.,
..
' f
-
-
- -. ~
~
--
~
~
~
!).!~
Fi~.
M.'&l
~(\
j17:t,f~
c.:,:'el
~..
... f:-,.;..<.:--.-,1
i::
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 17
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O--. ------.--------P-R--O-JE-C-T---D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BARTOW I-75 AT SR 20
PE 1994' $
20
610960 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 7
ROW NONE $
0
PROJECT MILEAGE : .00
CONST 1995
$
233
MANAGER:
FUND SOURCE: I-STATE MAINT.
FED SHARE$ 210
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
23
0TH SHARE$
BARTOW 620832
SR 61@ ETOWAH RIVER REPLACEMENT OF THE EXISTING BRIDGES($). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .63 MANAGER: M. REYNOLDS
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621255 IS AN ASSOCIATED PROJECT.
PE NONE ROW 1988 CONST
$
0
UNDERWAY
AFTER 96
BARTOW 620833
SR 61@ TWO ETOWAH RIVER OVERFLOWS REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .36 MANAGER: M. REYNOLDS
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
621255 rs AN ASSOCIATED PROJECT.
PE 1996 ROW NONE CONST
$
10
$
0
AFTER 96
BARTOW 621130
SR 113: BRIDGE & APPROACHES OVER HILLS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .30 MANAGER: M GANNAWAY (M)
CONG DIST. 7
. FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621430 IS AN ASSOCIATED PROJECT .
PE 1988 ROW NONE CONST
UNDERWAY
$
0
AFTER96
BARTOW 621250
SR 61/CARTERSVILLE FM GILMER ST TO SR 20/INCL 1-WAY PAIR RECONSTRUCTION & WIDENING FROM 3 LANES TO 5 LANES. PROJECT MILEAGE : 2.30 MANAGER: BILL MCVEY (M)
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BARTOW 621255
SR 61/CARTERSVILLE FM CR 533 NORTH TO HENDERSON DRIVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES,
PROJECT MILEAGE : 2.61 MANAGER: M. REYNOLDS (M)
BARTOW 621350
SR 20 FM SR 61 TO I-75 (INCL INTCH W/SR 61 & US 41) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.47 MANAGER: BILL MCVEY (M)
CONG DIST. 7FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 620832 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
UNDERWAY AFTER 96 AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 18
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A-----------------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BARTOW SR 113 RELOC FM PRESENT SR 113 TO CR 636;THENCE TO I-75
PE 1995
$ 184
621410 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
coNG DIST. 7
ROW
AFTER 96
PROJECT MILEAGE : 7.70 MANAGER: M GANNAWAY (M)
FUND SOURCE: SURFACE TRANSPORT,
CONST
AFTER 96
FEDERAL HIGHWAY ADMIN FUNDS
BARTOW 621430
SR 113 FM S/TAYLORSVILLE CL NE TO CR 31/STILESBORO/POLK RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE i 4,57
MANAGER: M GANNAWAY (M)
,_.
BARTOW 621435
SR 113@ DRY CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .16 MANAGER: M GANNAWAY (M)
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 621130 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL. HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 1954 AFTER 96
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
BARTOW 621440
SR 113 FM CR 31/STILESBORO NE TO SR 61 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4,39 MANAGER: M GANNAWAY (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$ 204 AFTER 96 AFTER 96
BARTOW 621445
SR 113@ RACCOON CREEK REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .17 MANAGER: M GANNAWAY (M)
CONG_ DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW NONE CONST
UNDERWAY
$
0
.AFTER 96
BARTOW 621500
SR 140 FM 0.3 MI W/OOTHKALOOGA CRK TO SR 3/US 41 RECONSTRUCTION& WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.00 MANAGER: M GANNAWAY (M)
BARTOW 621505
SR 140@ OOTHKALOOGA CRK & CSX RR REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .28 MANAGER: M GANNAWAY (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 621505 IS AN ASSOCIATED PROJECT.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621500.IS AN ASSOCIATED PROJECT,
PE 1992 ROW CONST
PE 1993 ROW NONE CONST
UNDERWAY AFTER 96 AFTER 96
UNDERWAY
$
0
AFTER 96
,.-
..
... ..
~
-~ ~ . ~--
~
~
~
~
~
~.,
~
~i~i~l,6,
~..:.....~~
~-',...,1/M
I<-:~
~
.- . i,,,,.-;-,,..,.,
r- . _.-._,
' -~.. .~>
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
Page 19
COUNTY
DESCRIPTION
FISCAL
COST
-P--, I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BARTOW SR 20/NEW ROUTE .. SEE FLOYD COUNTY_
PE 1993 UNDERWAY
62170X PRELIMINARY ENGINEERING/ NEW CONSTRUCTION
CONG DIST. 7
ROW NONE
$
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST NONE $
0
MANAGER: UNKNOWN
FUND SOURCE: DEMONSTRATION PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
621700 IS AN ASSOCIATED PROJECT.
BARTOW 621760
STATE ROUTE 113@ RICHLAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: M GANNAWAY (M)
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW NONE
CONST
UNDERWAY
$
0
AFTER 96
BARTOW 621810
US 41-SR 3 FM MP 8.01 TO MP 9.02 IN THE CITY OF CARTERSVILLE INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : 1.01 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
BARTOW 631400
SR 3/US 41 FM POSTELLE TO MLK & MOCKINGBIRD IN CARTERSVILLE
INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : 1.63 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: BILL MCVEY
r.
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
BARTOW 641500
CR 459/LOCAL ACCESS RD@ CSX RAILROAD BRIDGES/ TRAFFIC PROJECT MILEAGE : .15 MANAGER: M. REYNOLDS
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
17
ROW 1995 $
10
CONST 1996 $ 578
FED SHARE$
578
GA. SHARE$
0TH SHARE$
PE 1994 UNDERWAY
ROW LOCL
CONST 1994 $ 785
FED SHARE$ 707
GA. SHARE$
79
0TH SHARE$
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
BARTOW 641870
SR 293@ GRASSDALE RD/CR 155 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .26 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: BILL MCVEY
BARTOW 670686
CR 114@ OOTHKALOOGA CRK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .17 MANAGER: BILL MCVEY
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1994
$
70
CONST 1994 $ 170
FED SHARE$
136
GA. SHARE$
34
0TH SHARE$
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$
246
FED SHARE$
197
GA. SHARE$
49
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 20
PROJECT LISTING. BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BARTOW CR 204/NALLEY ROAD@ LITTLE PINE LOG CREEK 7.2 MIN OF WHITE
PE 1994 $
10
670688 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
CONG DIST, 7
ROW LOCL
PROJECT MILEAGE : .21
CONST 1996
$
387
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
310
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
77
0TH SHARE$
BARTOW 670910
CARTERSVILLE STREETSCAPE MASTER PLAN; PED/BIKE PATHS LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST, 7
FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
ROW NONE
$
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
144 0
1106 885 29 250
BARTOW 72169X
N,MARS HILL EXT FM SR 3/COBB PKWY TO I-75/BARTOW COUNTY
UNKNOWN/ UNKNOWN PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. SMITH
r .
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 721690 IS_AN ASSOCIATED PROJECT.
PE 1992 ROW CONST
UNDERWAY
AFTER 96 AFTER 96
,.
,, ,
. '
~
~
l!!!!J!!!!I! ... ~
~
~
~
~
l!'J,.~
~/L~
t!fS.:::.~
l?.'[:'i'.,.U~l
:-::.:.:;~::.:~:
~f:t,',lf
r.1'1--'~
t. ~ ' . !
..
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 21
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BEN HILL SR 90@ ALAPAHA RIVER/ALSO TURNER CO
PE 1992
UNDERWAY
431040 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
CONG DIST. 8
ROW 1994
$
1
PROJECT MILEAGE : 1.00
CONST 1995
$
718
MANAGER: J. LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
574
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 144
0TH SHARE$
BEN HILL SR 11 FM C&G @ BUSH ST, FITZGERALD TO C&G IN ABBE' LE .. WILCOX
431360 SHOULDER WORK/ MAINTENANCE PROJECT MILEAGE : 20.06 -.EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
345
FED SHARE$
276
GA. SHARE$
69
0TH SHARE$
BEN HILL SR 107/US 319 OVER STURGEON CREEK NEAR CR 5
442580 REPLACEMENT OF THE.EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00
.
MANAGER:
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
10
$
1
AFTER 96
BEN HILL SR 90 OVER ALAPAHA RIVER OVERFLOW 442590 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:
BEN HILL TURN LANES ON ROANOKE & MERRIMAC DRIVES IN FITZGERALD 450360 TURN LANES/ TRAFFIC
PROJECT MILEAGE : 1.60 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: J. LINDSEY
CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8. FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
5
ROW 1995 $
1
CONST 1996
$
170
FED SHARE$
136
GA. SHARE$
34
0TH SHARE$
PE 1992 ROW LOCL CONST
UNDERWAY, AFTER 96
BEN HILL EVERGREEN CEMETERY ROAD OVER TURKEY CREEK IN FITZGERALD 450420 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER:
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
10
ROW LOCL
CONST 1996
$
180
FED SHARE$
144
GA. SHARE $
36
0TH SHARE$
,_.
j
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 22
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
B-P-IB-.B-I.-N-O--. -E-L-D-E-R-L-Y--A-N-D--D-I-SP-AR-BO-L-JEE-DC-T-V-D-EA-HT-I.CA-L-E-S--A-N-D---EQ--U-IP-M-E-N--T-----------------------------C-O-M-M-E-N-T-S-----. ----------------------Y-E-A-R--------E-S-T-S--
3V1010 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 8 & 2
FUNDS RECIPIENT: AGENCIES IN BIBB MPO AREA
CAPITAL 1994
$
38
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
30
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
BIBB 3Vl011
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPI~NT: AGENCIES IN BIBB MPO AREA MANAGER: STEVE KISH
CONG DIST. 9 & 2
CAPITAL 1995
$
39
FUND SOURCE: ELDERLY & DISABLED FUND FED -SHARE$
31
FEDERAL TRANSIT ADMIN FUNDS
.GA ..SHARE $
. 4,
0TH SHARE$
4
BIBB 3V1012
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIE IN BIBB MPO AREA, MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1996
$
41
FUND. SOURCE: ELDERLY & DISABLED FUND FED SHARE$
33
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
BIBB 310713
I-75@ I-16; SOU RR; ARKWRIGHT RD; US 23 & SR 87; & 31Y713 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 7.30. MANAGER: H. ASHMORE
MACON TIP f. 230-TSM. CONG DIST. ~
FUND SOURCE: NAT'L HIGHWAY FEDERAL .HIGHWAY ADMIN FUNDS 31Y710 IS AN ASSOCIATED PROJECT.
PE NONE $
ROW NONE $
CONST 1994
$;
FED SHARE $
GA. SHARE $.
0TH SHARE$
0 0 23_85
1908 477
BIBB 310980
I-16@ SR 540 INCL I-16 ML BR@ SAL RR; 1 STREAM & 1 RIVER INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .97 - EXIST, LANES: 2 /PROPOSED LANES: 4
MANAGER: BEN BUCHAN (M)
MACON TIP f llOC-MC CONG DIST. 8 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1987 UNDERWAY ROW 1989 UNDERWAY CONST 1996 $ 22468-
FED SHARE$ 17974 GA. SHARE $. 4494 0TH SHARE$
BIBB 311000
I-16 IN MACON, INTER MOD@ SR 11, SR 22, SR 87
INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : 1.27 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: BEN BUCHAN (M)
.
MACON TIP I 180-MC
CONG DIST. 2:
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1987 UNDERWAY
ROW 1995 $ 320
CONST 1996 $ 3800
FED SHARE$ 3420
GA .. SHARE $
380
0TH SHARE$
BIBB 311130
I-16@ OCMULGEE RVR,WALNUT CK, OCMULGEE RVR OFLW
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : . 01 MANAGER: BEN BUCHAN (M)
MACON TIP I 270-TSM
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDER.AL HIGHWAY ADMIN FUNDS
PE 1986 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
\
'' "'.!Ii
. p
i
l!!J!!l!!!I!!!
I!!'.!!!'!!!!!!
. ~
~
~
~
ffi!!I~~
~
,. ~ .
~
B3!?::.t,
~as
~':'-"~~;
f:.~. .~:~~
I~~
,.:..;"""';'
. '
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 23
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
B--IB-B-------I--7-5/-M--A-C-O-N--F-M--P-I-E-R-C-E--A-V--E--EA--ST---TO---I--1-6------------------------------M-A-C-O-N--T-I-P--I--2-20-1-\.--M--C---------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
311400 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
CONG DIST. 8 & 2
ROW
AFTER 96
PROJECT MILEAGE : 1.62
CONST
AFTER 96
MANAGER: BEN BUCHAN (M)
FOND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
BIBB
I-16 FM I-75 EAST TO SR 11
, .
311410 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10
MANAGER: BEN BUCHAN (M)
MACON TIP I 190A-MC
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BIBB 311415
I-16/MACON FM SR 11 EAST TO SR 87 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10 MANAGER: BEN BUCHAN (M)
MACON TIP I 190B-MC
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
BIBB 311460
I-75@ HARTLEY BRIDGE RD/CR 740 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: BEN BUCHAN (M)
MACON TIP I 271-TSM
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 5000 AFTER 96
BIBB 311530
I-16@ SR 87/MLK JR. BLVD IN MACON LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E.. LAWS
BIBB 311560
I-75@ HARDEMAN AVE & FORSYTH ST
TURN LANES/ TRAFFIC PROJECT MILEAGE :- .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BEN BUCHAN
MACON TIP I 250-TSM
CONG DIST. 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP I 220-TSM
CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
70
FED SHARE$
56
GA. SHAAE $
14
0TH SHARE$
PE 1994 ROW 1995 CONST
UNDERWAY
$
190
AFTER 96
BIBB 311580
I-475 AT REST AREA I 19, MP 7.7NB
REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1994
$ 2000
FED SHARE $ 1800
GA. SHARE $
200
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 24
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
B--IB-B-------I--4-7-5--F-M---I--7-5--T-O--S--R--1-9-/-U-S---41-/-M-O-N-R-O-E-----------------------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY
311590 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CO~G DIST. 8 & 3
ROW NONE
$
0
PROJECT MILEAGE : 14.00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: ..L. SEABROOK
.
FUND SOURCE: I-STATE MAINT.
CONST _1994
$ 10000
FED SHARE $ 9000
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1000
0TH SHARE $.
BIBB 311685
I-16 FM JCT I-75 TO TWIGGS/BLECKLEY CL ... TWIGGS
I
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 8
PROJECT MILEAGE: 31.70 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
.
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
31168Z IS AN ASSOCIATED PROJECT.
PE NONE
$
ROW 1994
$
CONST 1994
$
FED SHARE$
,GA. SHARE$
0TH SHARE_ $
0
0 4706 4235
471
BIBB 311750
NAPIER AVE OVER I-75; I-75 OVER RAMP TO SR 87 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:
CONG DIST.8 & 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE_
ROW _CONST
AFTER 96 .AFTER 96
AFTER 96
BIBB 31Y713
I-75@ 5 BRIDGES; FOR IM FUNDING; SEE 310713 UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
BIBB 322000
SR 87/RIVERSIDE DR/MACON FM HALL RD TO NORTHSIDE DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.29 MANAGER: ~EN BUCHAN
BIBB 322005
SR 87/RIVERSIDE DR/MACON@ SABBATH CREEK REHAB. OF-THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN
BIBB 33175X
HOUSTON RD FM SR 11 TO WALDEN/SARDIS;SEE HOUSTON SPLIT UA $ UNKNOWN/ UNKNOWN PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 230-MC CONG DIST. 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL_HIGHWAY ADMIN FUNDS 322005 IS AN ASSOCIATED PROJECT.
MACON TIP f 230-MC(2) CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322000 IS AN ASSOCIATED PROJECT.
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 331750 IS AN ASSOCIATED PROJECT,
PE NONE $
0
ROW NONE
$
0
CONST 1994
$: 300
FED SHARE$
270
GA .. SHARE $.
30
0TH SHARE$
PE 1992 UNDERWAY
ROW 1995 $ 250
CONST 1996 $ 3023
FED SHARE $ 2418
. GA. SHARE $
605
0TH SHARE $
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1996
$
320
FED SHARE $
256
GA. SHARE $
64
0TH SHARE $
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1996
$
277
FED SHARE $
222
GA. SHARE $
55
0TH SHARE $
,,
~~
'4
..
,, '
-: ~
!'!!ffllJ!9
~ !R!!'8 Mi.@ ~ ~ ~ ~ ~ ~i.511 ~:l!tM = ~ " t:.~~~ tee:-'::::, ~~}-';l ~.;..~
,-,.
"'
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 25
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------ BIBB
MILLERFIELD RD/MACON@ JEFFERSONVILLE RD
. MACON T-IP---f --10-0---T-S-M----------------------PE---N-O-N-E-----$------0
342080 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 2
ROW LOCL
PROJECT MILEAGE : .40 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
156
MANAGER: GORDON BROWN
FUND SOURCE: HWY. SAFETY
FED SHARE$
140
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
16
0TH SHARE$
BIBB 350520
WID & RCST FOREST HILL RD IN MACON: OVERLOOK TO WIMBISH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .60 MANAGER: D. CHURCH
MACON TIP f 141-MC CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1984 ROW LOCL CONST
UNDERWAY AFTER 96
BIBB 350560
SR 247/US 41/PIO NONO AVE FM I-75 TO SR 49/US 129/ RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 1.30 MANAGER: D. CHURCH
r.
BIBB 350760
CR 79/NORTHSIDE DR FM FOREST HILL RD TO SR 87/& SABBATH CK RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.60 MANAGER: BEN BUCHAN
BIBB 350820
HOUSTON RD FM WALDEN/SARDIS CH RDS TO SR 11 MINOR WIDEN & RESURF / RECST. OR REHAB. PROJECT MILEAGE : 3.20 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: GORDON BROWN(M)
BIBB 350960
SR 74 FM W/I-475 TO COLUMBUS RD (INCL BR OVER I-475) TURN LANES/ TRAFFIC PROJECT MILEAGE : 1.30 - EXIST. LANES: 4 /PROPOSED LANES:. 5 MANAGER: BEN BUCHAN (M)
BIBB 371030
LANDSCAPING OF CIVIC SQUARE FOR PARK IN MACON LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOS.ED LANES: 0
MANAGER: CORA COOK
MACON TIP f 140-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 210-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 150-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 339-MC CONG DIST. 8 & 2 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 & 8 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1987
UNDERWAY
CONST 1994
$ 2928
FED SHARE $ 2342
GA. SHARE $ 586
0TH SHARE $
PE 1992 UNDERWAY ROW LOCL
CONST 1995. $ 3811 FED SHARE$ 3049 GA. SHARE$ 762 0TH SHARE$
PE 1992
UNDERWAY
ROW LOCL
CONST 1995
$
757
FED SHARE$
606
GA. SHARE$ 151
0TH SHARE$
PE 1994
$
ROW 1995 $
CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
35 110 1238 1114 124
PE 1994
$
60
ROW LOCL
CONST 1994
$
240
FED SHARE$
192
GA. SHARE$
12
0TH SHARE$
60
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 26
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
B-P-IB-.BI-.-N-O--. -C-A--LL--B-O-X--ES--O-N--P-IR--1O-6-JE-CF-RT-O-MD-A--TSRA---8-7-/B-I-B-B---TO---I--9-5-/C-H-A--T-H-A-M-----------------------C-O-M-M-E-N-T-S--------------------------P-EY-E-A1-R9-9-4-----$-E-S-T-S-.-so
811030 MISCELLANEOUS IMPROVEMENTS/ NEW CONSTRUCTION
CONG DIST. 1 & 8
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1996 $ 1660
MANAGER:
.
FUND SOURCE: I-STATE MAINT.
FED SHARE$ 1494
FEDERAL HIGHWAY ADMIN FUNDS
GA, SHARE$ 166
0TH SHARE$
r_-
,.
1)1
<!'
,
'
. '
l!!!l!!!!!l
~
. l!Jll!!l!!!I ~
~
~
~
~
!,I..~
~~
= ~
~!Kt~
\~~~~-=~
w.~::~t,
~!~l
~~
'1
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
P~ge 27
COUNTY
DESCRIPTION
FISCAL
COST
-- P.I.NO.
PROJECT DATA
B--L-EC--K-LEY---CO-U--N-TY---O-P-ER-A--T-ED- -- PUBLIC--T-R-A-N-S-I-T--S-ERVICE
COMMENTS
YEAR
ESTS
----------------------------------------------------------------------------------
2B1088 TRANSIT FACILITIES/ OPERATIONS
. CONG DIST. 8
FUNDSRECIPIENT: BLECKLEY
OPERATING 1994 $
52
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
31
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
21
BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 281089 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1995 $
54
FUND SOURCE: RURAL TRANSIT
FED SHARE$
32
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
22
BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 281090 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY .
MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1996 $
58
FUND SOURCE: RURAL TRANSIT
FED SHARE$
34
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
24
BLECKLEY ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
2C2088 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH
CONG DIST. 8
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2089 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH
CONG DIST. 8
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2090 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT
CAPITAL 1996
$
21
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
BLECKLEY I-16 FROM TWIGGS CL TO US 441 IN LAURENS COUNTY
210670 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 8
PROJECT MILEAGE : 18.30 - EXIST. LANES: 4 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
4517 4065
452
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
P.age 28
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
B-L-E-C-K-L-E-Y--S-R--8-7-/-U-S--2-3--I-N--C-O-C-H--R-A-N-@----SO-U-T-H-E-R-N--R-R----------------------------------------------------'
-----~
----------Y-E-A-R---------E-S-T-S-PE 1985 UNDERWAY
221130 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 8
ROW 1988 UNDERWAY
PROJECT MILEAGE : .30
'CONST 1994
$ 1006
MANAGER: D. GRIFF~TH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
805
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
201
0TH SHARE $
BLECKLEY SR 87 FM S/BOLLINGER CRK-BLECKLEY TO SR 96/TWIGGS 222070 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 7. 79 MANAGER: H. ASHMORE(M)
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL "IGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST.
UNDERWAY
$
116
AFTER 96
BLECKLEY SR 87 FM SR 257 NW TO THE COCHRAN BYPASS 222360 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.50 MANAGER: H. ASHMORE(M)
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$
90
AFTER 96
AFTER 96
BLECKLEY SR 112: OVER BOLLINGER CREEK 242160 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:
CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW CONST
$
10
AFTER 96
AFTER 96
.,
!Y
r_-
"
,, r
j
,. F!M!e !!Ml! ,, ~ ~ ~ ~ ffi!!1 ~ e.ftttl ~~ ~ ~ ~~~ ~?~"."~ !'.!r1;-!~.i ~
. ,,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-.1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 29
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
BRANTLEY CR 11@ HILL CREEK WEST OF HOBOKEN
--------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PE 1994
$
4
570925 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 1
ROW LOCL
PROJECT MILEAGE : .20
CONST 1996
$
144
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
115
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
29
0TH SHARE$
! .
I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE-TRANSPORTATION IMPROVEMENTS PROGRAM
Page 30
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BROOKS SR 94 FM W/CR 276 TOE OF WITHLACOOCHEE RVR/LOWNDES
PE 1992
UNDERWAY
421720 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 2
ROW
AFTER 96
PROJECT MILEAGE : 1.60
CONST
AFTER 96
MANAGER: K FULBRIGHT (M)
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
421722 IS AN ASSOCIATED PROJECT.
BROOKS 421722
SR 94@ LITTLE RVR;WITHLACOOCHEE RVR & OFLW/ALSO LOWNDES REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .20 MANAGER: K FULBRIGHT (M)
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421720 IS AN ASSOCIATED PROJECT.
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
BROOKS 421990
SR 94 NB FM MP 10.0-11.S;SB MP 1.6-3.1 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.00 MANAGER: J. LINDSEY
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
864
FED SHARE$
691
GA. SHARE$
173
0TH SHARE$
BROOKS 431420
SR 33 AT NORFOLK SOUTHERN RAILROAD ... f723472U
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER
CONG DIST. 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
75
FED SHARE$
68
GA. SHARE$
8
0TH SHARE$
BROOKS 470870
CR 268@ PISCOLA CREEK & OVERFLOW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .53 MANAGER: J. LINDSEY
CONG DIST. 2
FUND-SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 853 FED SHARE$ 682 GA. SHARE$ 171 0TH SHARE$
<.
:;
,.
1,
,, '
f
~
-~ ~
,, im= ~
~
~
~ ~
~ ~
~[~~
~ ==
~~m;~
!,tt:t:~
~~
tti~-:~
f:?;<:-~
Vi''-'~
el .....))
. ,, f'\',.,......
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 31
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BRYAN COUNTY OPERATED PUBLIC TRANSIT SERVICE
5Bl283 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 1
FUNDS RECIPIENT: BRYAN
OPERATING 1994
$
86
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
50
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
36
BRYAN 5B1284
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH
BRYAN 5B1285
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH
CONG DIST. 1
OPERATING 1995 $
91
FUND SOURCE: RURAL TRANSIT
FED SHARE$
53
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
38
CONG DIST. 1
OPERATING 1996
$
95
FUND SOURCE: RURAL TRANSIT
FED SHARE$
55
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
40
BRYAN 5C2283
ONE CONVERSION VAN AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH
CONG DIST. 1
CAPITAL 1994
$
48
FUND SOURCE: RURAL TRANSIT
FED SHARE$
38
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
OTH.SHARE $
5
BRYAN 5C2284
ONE CONVERSION VAN WITH LIFT
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH
CONG DIST. 1
CAPITAL 1995
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
BRYAN 51115X
I-95 FM JERICO RVR TO US 17 ... SEE LIBERTY CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 511150 IS AN ASSOCIATED PROJECT.
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
BRYAN 511190
I-16 WIDEN 10 BRIDGES@ MP 138.3; 145.9; 146.6; 146.8; 147.2 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
ROW NONE $
CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
75
0
2502 2252
250
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 32
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BRYAN I-95 FM 0.8 MIS/US 17 TO OGEECHEE RVR; FOR IM FUNDS
PE NONE $
0
51Y020 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
CONG DIST. 1
ROW NONE $
0
PROJECT MILEAGE : 5.40
CONST 1994 $ 5761
MANAGER:
FUND SOURCE: I-STATE MAINT.
FED SHARE$ 5185
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
576
0TH SHARE$
BRYAN 521750
US 17/RICHMOND HILL FM SR 144 N TO S/OGEECHEE RIVER OFLW BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.90
MANAGER: M. REYNOLDS
CONG DIST. 1
FUND SOURCE: SURF~CE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995 $ 3732
FED SHARE$ 2986
GA. SHARE$
746
0TH SHARE$
BRYAN 521755
WIDEN & NEW BRIDGE ON US 17@ OGEECHEE RIVER/ALSO CHATHAM CO
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : . 3 6 MANAGER: M.. REYNOLDS
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521750 IS AN ASSOCIATED PROJECT.
PE 1991
UNDERWAY
ROW NONE $
0
,CONST 1995 $ 2388
FED SHARE$ 1910
GA. SHARE$ 478
0TH SHARE$
BRYAN 521758
US 17/RICHMOND HILL FM 4-LN N/I-95 TON/SR 144/INCL NEW BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: M. REYNOLDS
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1992 UNDERWAY
CONST 1994
$ 5193
FED SHARE$ 4154
GA. SHARE$ 1039
0TH SHARE$
BRYAN 531130
SR 144/RICHMOND HILL FM CR 100 NW TO SR 25/US 17 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.57 MANAGER: M. REYNOLDS
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1990 UNDERWAY
CONST 1994
$ 1899
FED SHARE$ 1519
GA. SHARE$
369
0TH SHARE$
11
BRYAN 531220
SR 144/RICHMOND HILL FM WEST RAMPS@ I-95 EAST TO US 17 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.41 MANAGER: M; REYNOLDS
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994 $ 1643
FED SHARE$ 1314
GA. SHARE$
329
0TH SHARE$
BRYAN 532360
CR 90 FM OCEAN HWY/SR 25 TO PARK HILL RD/CR 154 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 6.92 MANAGER: PETE BLQ~KER.
CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$ 2525
FED SHARE$ 2020
GA. SHARE$
505
0TH SHARE$
.,, .~
,4
,, r
.....
~
I!!!!!!!!! ~ ~ ~ ~ ffif.!!fj !!JSJ,.6 ~ ~:S"i;~ ~~ ~!~~ ~;<-
~
~. .. f ... -,,..,
r?'""'~
~
I l
.r,-:,"'! '
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 33
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
BRYAN CR 90/BELFAST-KELLER RO OVER TIVOLI RIVER
PE 1994
$
9
532410 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
CONG DIST. 1
ROW LOCL
PROJECT MILEAGE : .20
CONST 1995
$
341
MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
273
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
68
0TH SHARE$
-----------:----------------------------------,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 34
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
BULLOCH COUNTY OPERATED PUBLIC TRANSIT SERVICE
5Bl518 TRANSIT PROJECTS/ OPERATIONS
CONG DIST. 1
FUNDS RECIPIENT: BULLOCH COUNTY
OPERATING 1994 $
41
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
17
BULLOCH 5Bl519
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH
CONG DIST, 1
OPERATING 1995 $
44
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
18
BULLOCH 5Bl520
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH
CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996 $ - 46
FED SHARE$
27
GA. SHARE$
0TH SHARE$
19
BULLOCH 5C2518
ONE CONVERSION VAN WITH LIFT AND MOBILE RADIO TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH
(_
BULLOCH 5C2519
TWO CONVERSION VANS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: BULLOCH COUNTY
MANAGER: STEVE KISH
CONG DIST. 1
FUND SOURCE: RURAL TRANSIT
CAPITAL 1994
$
32
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
CONG DIST, 1
CAPITAL 1995
$
58
FUND SOURCE: RURAL TRANSIT
FED SHARE$
46
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
6
0TH SHARE$
6
BULLOCH 521170
SR 73 W@ LOWER LOTTS CRK 6 MI SOUTH OF STATESBORO
BRIDGES/ OTHER PROJECT MILEAGE : ,30 MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
1
CONST 1995 $
96
FED SHARE $
77
GA. SHARE $
19
0TH SHARE $
BULLOCH 521270
SR 67 FM CR 248/585 NORTH TO 5-LN SECTION RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.40 MANAGER: PETE BLOCKER
CONG DIST. 1
"FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 521275 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1995 CONST
UNDERWAY
$
80
AFTER 96
_,, .,., -
,,
rf r
r
P!!!!!!
~
~ ~
-~
~
-
~
~
~
~
~
r,t'::"i;,"
,.~ . ...,j
~- -~.~. .. --!~,
~
~1 Ltt ,
;-.--,.,....,, iJ..
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-,1993 Page 35
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
--- -----------------
PROJECT--D--A-T-A--
- -----------------------------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
BULLOCH SR 67@ LITTLE LOTTS CRK
PE 1992
UNDERWAY
521275 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 1
ROW NONE
$
0
PROJECT MILEAGE : . 20
CONST
AFTER 96
MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
521270 IS AN ASSOCIATED PROJECT.
BULLOCH 521800
SR 73/US 301 FM PACKING HOUSE RD TO NORTH OF CR 445 & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.45 MANAGER: RAY METTS (M)
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BULLOCH 521970
SR 26/STATESBORO FM BRANNEN RD/CR 482 TO SR 67/73/US 301 RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : 1.72 MANAGER: RAY METTS (C/M)
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BULLOCH 522230
OLD SR 46@ BLACK CREEK 1.2 MI W/SR 26 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : . 50 MANAGER: PETE BLOCKER
BULLOCH 522465
SR 67@ WOODCOCK BRANCH & ZETTEROWER BRANCH REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .12 MANAGER: RAY METTS (C/M)
BULLOCH SR 26/US 80 EB MP 7.1-8.2; WB MP 8.1-9.3
522470 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 2.30
MANAGER: PETE BLOCKER
.
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 522460 IS AN ASSOCIATED PROJECT.
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW LOCL
CONST 1995 $ 859
FED SHARE$
687
GA. SHARE$
172
0TH SHARE$
PE 1992 ROW NONE CONST
UNDERWAY.
$
0
AFTER 96
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BULLOCH 522740
SR 26 AT ZETTERTOWER/STOCKYARD
TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
9
ROW 1995 $
10
CONST 1996
$
289
FED SHARE$ 289
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 36
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BULLOCH OLD.SR 46@ LITTLE LOTTS CK 11 MI SOUTH OF STATESBORO
PE 1993 UNDERWAY
531270 . REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 1
ROW LOCL
PROJECT MILEAGE : .22 MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
CONST 1995
$
575
.FED SHARE$
460
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
115
0TH SHARE$
BULLOCH 541950
SR 46 OVER LUKE SWAMP BRANCH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
10
$
1
AFTER 96
BULLOCH 550500
BRANNEN ST/GENTILLY RD FM SR 67 TO SR 26 INCL BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE: 1.47 MANAGER: PETE BLOCKER
BULLOCH 571010
STATESBORO GREENWAYS; LANDSCAPING.
BICYCLE/PED. FACILITY./ ENHANCEMENT
PROJECT MILEAGE : ;oo - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
r_
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1996 $ 847
FED SHARE$
678
GA. SHARE$
169
0TH SHARE$
PE LOCL
ROW 1994 $ 200
CONST 1994 $ 175
FED SHARE$ 140
GA. SHARE$
40
0TH SHARE$
75
~ V
.,
,., r
~
@m
~ ,, ~ '
~
~
~
~
~
~
&
~
~~
m 1:--:,:.:
~~~7,}
f~.'.L'tl.~
. ~ '
..f- ..., . <
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 37
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D--A-T-~----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BURKE COUNTY OPERATED PUBLIC TRANSIT SERVICE
2Bl093 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 11
FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH
OPERATING 1994 $
68
FUND SOURCE: RURAL TRANSIT
FED SHARE$
40
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
28
BURKE 2Bl094
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS. RECIPIENT: BURKE MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1995 $
71
FUND SOURCE: RURAL TRANSIT
FED SHARE$
42
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
29
BURKE 2Bl095
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1996 $
75
FUND SOURCE: RURAL TRANSIT
FED SHARE$
44
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
31
BURKE 2C2093
TWO STANDARD VANS
TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH.
CONG DIST. 11
CAPITAL 1994
$
40
FUND SOURCE: RURAL TRANSIT
FED SHARE$
32
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
BURKE 2C2094
TWO STANDARD VANS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH
CONG DIST. 11
CAPITAL 1995
$
40
FUND SOURCE: RURAL TRANSIT
FED SHARE $'
32 ,
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
BURKE 2C2095
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH
CONG DIST. 11
.
FUND SOURCE: RURAL TRANSIT
CAPITAL 1996
$
32
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $.
3
0TH SHARE$
3
BURKE 221190
SR 56/SR 80 NE OF WAYNESBORO@ BRIER CRK BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .46 MANAGER: D. GRIFFITH
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$ 1876
FED SHARE $ 1501
GA. SHARE $ 375
0TH SHARE $
. \
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 38
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
p. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
B-U-R-K-E-----S-R---56--A-T--N-O--R-FO-L-K---SO-U-T-H-E-R-N---R-A-IL-R-O-A-D----.-f6-2-0-2-9-0-W-------------------------------------------------------------P-E--N-O-N-E-----$----- 0
231500 RR XING / TRAFFIC
CONG DIST. 11
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
75
MANAGER: W HESTER
FUND SOURCE: HWY. SAFETY
FED SHARE$
68
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
8
0TH SHARE$
BURKE 270840
79 AC MUNDY WETLAND MITIGATION SITE N/SR 56;NE OF WAYNESBORO RIGHTS-OF-WAY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1994
$
125
CONST 1994
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
BURKE 270890
BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 2
BRIDGE PAINTING /MAINTENANCE PROJECT MILEAGE: .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE $
.CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 1314 1051 263
(.
') .-i
1,.
,r .-
(4 t,
~
@I!!!!
!!!Ml i ~ .},.,.,,'-' !I
~
~
fflii
-,:,;,.c~
~
~
If
~~ J:::.'t:::~
j
;;:.:;:::=.~
/'.,;:~
~
~ i:,----\,.
~ , . . .
j ~-.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 39.
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ----------------P-R-O-J-E-C-T--D-A-T-A----------------------------~r-. ----------------C-O-M-M--EN-T-S----------------------------Y-EA-R---------E-S-T-S--
BUTTS I-75@ SR 36 FM 0.5 MI SW/I-75 TO 0.55 MI NE/I-75[& BRIDGE]
PE 1992 UNDERWAY
311380 INTERCHANGE/ RECST. OR REHAB.
CONG DIST. 11
ROW 1994 $ 10181
PROJECT MILEAGE : 1.10 - EXIST. LANES: 2 /PROPOSED LANES: 4
CONST 1995 $ 4577
MANAGER: H. ASHMORE (C)
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 4119
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
458
0TH SHARE $
BUTTS 311730
I-75: SR 36 OVER I-75 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
10
ROW 1995 $
1
CONST 1996 $ 169
FED SHARE$
152
GA. SHARE$
17
0TH SHARE$
BUTTS 322440
SR 36/JACKSON FM SR 16 TO CR 289/STARK RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .63 MANAGER: H. ASHMORE(M)
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
BUTTS 332060
SR 16 OVER YELLOW WATER CREEK REPLACEMENT OF THE EXISTING BRIDGES{$). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
11
ROW 1995 $
1
CONST 1996 $ 741
FED SHARE$ 593
GA. SHARE$ 148
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 40
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-5PA-1M-1. -0ID.-7ENN0-O--. -R-I-E-9C-5O--N-FSM-TR-FU-L-CA-T-IOL-NI-NP-RE-&O-WT-JEO-ICD-T-HE-NA-DIRN-ARG-TIA-E-FTR-TO-SM-BL4UL-FAF-N-R-ES-D-/I-TNO-C--L6--BL-AR-N@-E-S-C.-ROOKED---R-V-R------C-O.NG--D-C-IO-SM-T-M. -E-1N-T-S-------------------------RO-PWE-Y-EA-N1R-O9-N9-E3-----U$-NE-DS-ETR-SW--AY0
PROJECT MILEAGE : 7. 22
l .
CONST 1995
$ 21500
MANAGER: J. GRAYBEAL
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$ 17200
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 4300
0TH SHARE$
CAMDEN 511075
I-95@ ST MARY'S RIVER@ FLA STATE LINE; & 51Y075 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .23 MANAGER: J. GRAYBEAL
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 4775
FED SHARE$ 3820
GA. SHARE$ 1438
0TH SHARE$ 2393
CAMDEN 511080
I-95 FM HARRIETT'S BLUFF RD TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 6.72 MANAGER: J. GRAYBEAL
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 10608
FED SHARE$ 8486
GA. SHARE$ 2122
0TH SHARE$
CAMDEN 511082
I-95 FM SR 25 SPUR TO CR 138/INCL BRIDGES RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 8.44 MANAGER: J. GRAYBEAL
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 21000
FED SHARE$ 16800
GA. SHARE $ 4200
0TH SHARE$
CAMDEN 511084
I-95 FM.CR 138 TO US 17/GLYNN & BR@ L SATILLA RVR .. GLYNN RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 6.76 MANAGER: J, GRAYBEAL .
BRUNSWICK TIP f BATS93-11 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL.HIGHWAY ADMIN FUNDS
PE 1996 $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
231 0
11568 9254 2314
CAMDEN 51Y075
I-95@ ST. MARY'S RV@ FLA STATE LINE; FOR IM$; SEE 511075 UNKNOWN/ UNKNOWN PROJECT MILEAGE .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 250
FED SHARE$ 225
GA. SHARE$
25
0TH SHARE$
CAMDEN 521910
SR 40@ SATURDAY PARK SC AND FOOD LION PLAZA INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE : .50 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 233
FED SHARE$- 186
GA. SHARE$
47
0TH SHARE $
,,.. ,.
l ~,
., .
' .
.... "'',''
~
l@B
. M@J ~ ,
~
~
= ~
~.!W!!
~L!fj
_,_1--- ~,w.iifj
..
"
.. ,;.,.;.-.,.,.,V,..<..,J..
:,~~r~~~:-:.::1
/,:~'.:~
Mt~
.. ,.~ ~,.:~-~
t:" .....,.._,
...
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 41
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-----------------------------------------------------------------------------------------------------------------------------------
CAMDEN SR 40 FM W/CR 61 TO SR 25/US 17
PE 1992 UNDERWAY
522080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 1
ROW
AFTER 96
PROJECT MILEAGE : 3.86
CONST
AFTER 96
MANAGER: H. ASHMORE (CM)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
CAMDEN 522690
SR 25/US 17 BRIDGE OVER ST. MARY'S RIVER /FLA STATE LINE
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .oo
MANAGER:
CAMDEN 532480
SR 40@ CR 81 AND I-95 SB ON/OFF RAMPS IN KINGSLAND INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .14 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: PETE BLOCKER
CAMDEN 571000
A STUDY OF BIKE/PEDESTRIAN PATHS IN COASTAL GEORGIA
PRELIMINARY ENGINEERING/ ENHANCEMENT PROJECT MILEAGE : .00 --EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
ROW 1994 $
CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
300 5
3050 2440
610
PE NONE
$
0
ROW LOCL
CONST 1994
$
275
FED SHARE$ 248
GA. SHARE$
28
0TH SHARE$
PE 1994
$
125
ROW NONE $
0
CONST NONE $
0
CAMDEN 571050
WOODBINE WATERFRONT BOARDWALK, SIDEWALK AND LANDSCAPING BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
59
ROW NONE $
0
CONST 1994
$
609
FED SHARE$
487
GA. SHARE$
12
0TH SHARE$
134
r
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P. I.NO.
PROJECT DATA
COMMENTS
C-A--R-R-O-LL---C-S--8-2-4-/S-T-E-W--A-R-T--S-T-/-C-A-R-R-O-L-L-T-O--N-@--C--U-R-T-IS---C-R-E-EK-------------------------------- - ---------- --
350660 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
CONG DIST. 7
PROJECT MILEAGE : .25
MANAGER: BILL MCVEY
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 42
FISCAL
COST
YEAR
,. ESTS
-------------------------
PE1991
UNDERWAY
ROW LOCL
CONST 1996 $ 303
FED SHARE$ 242
GA. SHARE$
61
0TH SHARE$
CARROLL 370725
CR 813/STATE LINE RD@ BIG INDIAN CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .30 MANAGER: BILL MCVEY
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1990 UNDERWAY
ROW LOCL
CONST 1994 $ 391
FED SHARE$ 313
GA. SHARE$
78
0TH SHARE$
CARROLL 61091X
I-20 SAFETY IMPROVEMENTS FRM ALA STATE LINE TO SR 61/HARALSO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
CARROLL 621770
CARROLLTON BYP FM 4-LN S/US 27A TO 4-LN ON BANKHEAD/& CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.78 MANAGER: RON BRAZIEL
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994 $
10
CONST 1995 $ 5865
FED SHARE$ 4692
GA. SHARE $. 1173
0TH SHARE$
CARROLL 621820
SR 61 AT SR 166 SIGNALS/ TRAFFIC PROJECT MILEAGE .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
7
ROW NONE $
0
CONST 1996 $ 231
FED SHARE$ 231
GA. SHARE $.
0TH SHARE$
CARROLL 631300
SR 166 FM CR 828/141 TO 4-LN/CARROLLTON .. INCL BRIDGES RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 5.65 MANAGER: RON BRAZIEL (M)
CONG DIST. 7
FUND. SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 5607 AFTER 96
CARROLL 631310
SR 166 FM SR 100/BOWOEN TO CR 828 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.10 MANAGER: RON BRAZIEL (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY
AFTER 96 AFTER 96
....
~ ..
'('l
fFM
~ ~
. ~ ~ "'
~
~
~!lll
~ ~
rn~
~,~
. . h~ ~i;'t,$\
~:~-:,::~
. ~;::\ ,~
I::;::~
i:r;;.,.;:~,
.. r.""l'~
..., .
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 43
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
-------------------------------------------------------------------------
------C-O-M-M-E-N-T-S---------------------------Y-E-A-R---------E-S-T-S--
CARROLL SR 16/US 27ALT FM SR 166 SE TOW OF STRIPLING CHAP RD/CR 24
PE 1993 UNDERWAY
631320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 7
ROW 1994 $ 1531
PROJECT MILEAGE : 1.65
CONST 1995 $ 4282
MANAGER: RON, BRAZIEL (C)
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 3426
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
856
0TH SHARE $
CARROLL 641890
N CARROLLTON BYP/SR 166 CONN. FM SR 1 TO SR 166 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.90 MANAGER: RON BRAZIEL (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$ 2429 AFTER 96
CARROLL 641910
SR 100 NB MP 5.30-4.28: SB MP 6.9-7.89 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.01 MANAGER: BILL MCVEY (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
26
$ 164
AFTER 96
CARROLL 650480
SR 8/US 78 AT CS 777 TURN LANES/ TRAFFIC PROJECT MILEAGE : .23 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER:
CARROLL 662500
CR 217/PLOWSHARE RD@ BUCK CREEK
.
1.
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25
MANAGER: BILL MCVEY
CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
9 0 . 165
149 17
PE 1992
UNDERWAY
ROW LOCL
CONST 1994 $ 339
FED SHARE$ 271
GA. SHARE$
68
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 44
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CATOOSA COUNTY OPERATED PUBLIC TRANSIT SERVICE
6B1333 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: CATOOSA
OPERATING 1994
$
88
MANAGER: STEVE KISH
FU~D SOURCE: RURAL TRANSIT
FED SHARE$
47
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
42
CATOOSA 6B1334
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
92
FUND SOURCE: RURAL TRANSIT
FED SHARE$
49
FEDERAL TRANSIT ADMIN FUNDS
"GA. SHARE$
0TH SHARE$
43
CATOOSA 6B1335
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS . FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1996 $
96
FUND SOURCE: RURAL TRANSIT
FED SHARE$
51
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
45
CATOOSA 6C2333
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1994
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL-TRANSIT ADMIN FUNDS
GA .. SHARE $
2
0TH SHARE$
2
CATOOSA 6C2334
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA
MANAGER: STEVE KISH
CATOOSA 6C2335
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA
MANAGER: STEVE KISH
CONG DIST. 9 FUND SOURCE:. RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
I
CONG DIST.. 9 FUND. SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CATOOSA 610720
PE & DESIGN FOR REPLACING WELCOME CENTER/I-75 N. OF RINGGOLD
REST AREA/ NEW CONSTRUCTION PROJECT MILEAGE : .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RON BRAZIEL (C)
CHATTANOOGA TIP I 3 CONG DIST. 9
FUND.SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CAPITAL 1995
$
29
FED SHARE $ 23
GA. SHARE$
3
0TH SHARE$
3
CAPITAL 1996
$
32
FED SHARE$
26
GA. SHARE $
3
0TH SHARE$
3
PE 1991 UNDERWAY
ROW 1994
$
672
CONST 1995 $ 4080
FED SHARE$ 3672
GA. SHARE$ 592
0TH SHARE $ 1000
.,
).r
' .
'll'
~
~
-~ .I le
~
~
ffl~
tt-~~
~IS
.. ~~~ ~,,
tl~!:.::~
~1.~~- ..... !J
t~._~,~~t~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
CATOOSA 610730
I-75@ SR 3/US 41
INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .35 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: EX PASSMORE
.
CHATTANOOGA TIP t 10
CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
..~~i
.,,,"'
16-Sep-1993 Page 45
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1995
$
120
CONST l!:196
$ 1720
FED SHARE $ 1548
GA. SHARE $
172
0TH SHARE $
CATOOSA 610800
I-75 FM SR 2 TO SR 146 RECONSTRUCTION & WIDENING FROM 6 LANES TO 8 LANES. PROJECT MILEAGE : 3.63 MANAGER: RAY METTS (M)
CHATTANOOGA TIP t 14
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$ 1000 AFTER 96
CATOOSA 610810
I-75 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 6 LANES TO 8 LANES. PROJECT MILEAGE : 1.42 MANAGER: RAY METTS (M)
CHATTANOOGA TIP t 13
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$ 500 AFTER 96
CATOOSA 610820
CO SYSTEM FM S/SCRUGGS RD TO TENNESSEE STATE LINE CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : .50 MANAGER: RAY METTS (M)
CHATTANOOGA TIP t 12
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS
PE 1993 ROW 1995 CONST
UNDERWAY $ 107 AFTER 96
CATOOSA 621530
SR 151 FM RELOC. HACKETT RD/CR 179 N TO I-75@ RINGGOLD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.30 MANAGER: M GANNAWAY (M)
CATOOSA 631190
CR 382/0LD SR 2@ SOUTH CHICKAMAUGA CRK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
PROJECT MILEAGE : .18 MANAGER: BILL MCVEY
CATOOSA 631420
SR 2/SR 3/US 41 AT SPARKS STREET IN NASHVILLE TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CHATTANOOGA TIP t 16
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y530 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP t 8
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 200 AFTER 96
PE 1992 UNDERWAY
ROW LOCL
CONST 1995 $ 303
FED SHARE$ 242
GA. SHARE$
61
0TH SHARE$
PE NONE $
0
ROW 1994
$
10
CONST 1995
$
173
FED SHARE$
173
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 46
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-AP-T-.IO-.O-N-SOA--. -S-R---1-4-6-@--C-R---80-;-P@R--O-CJE-SC--Tj4--7D-A;-T-A@--C-R--5-8-/--C-R--5-8-@---S-R--2--------------------C-H-A-T-T-A.NCOO-OM-G-MA-E-NT-TSI-P--f--6---------------------P-EY-E-A1-R9-9-3-----U-NE-DS-ETR-SW--AY
641820 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 9
ROW 1994
$
100
PROJECT MILEAGE: .SO - EXIST. LANES: 2 /PROPOSED LANES: 2
CONST 1995
$
741
MANAGER: BILL MCVEY
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $
593
FEDERAL HIGHWAY AOMIN FUNDS
GA. SHARE $
148
0TH SHARE $
CATOOSA 650430
SR 3/US 41 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .66 MANAGER: M GANNAWAY (M)
CHATTANOOGA TIP f 11 CONG oisT. 9
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY AOMIN FUNDS
PE 1993
ROW 1995 CONST
UNDERWAY
$ 165 AFTER 96
CATOOSA 650440
SR 146/CLOUO SPRINGS RO FM LAKEVIEW OR TO I-75/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2. 34 MANAGER: M GANNAWAY (M)
CATOOSA 650500
SR 146 AT CROSS STREET SIGNALS/ TRAFFIC: PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
CATOOSA 65Y440
SR 146/CLOUO SPGS RO FM LAKEVIEW TO I-75&BRIOGE .. SEE 650440 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES .. PROJECT MILEAGE: 2.34 MANAGER: M GANNAWAY
CATOOSA CR 259 SOUTH OF RINGGOLD@ LITTLE CHICKAMAUGA CRR 670710 .REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
.PROJECT MILEAGE : .14
MANAGER: BILL MCVEY
CHATTANOOGA TIP f 15 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 65Y440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP f 22 CONG [?IST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
CHATTANOOGA TIP f 15 CONG DIST. 9
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY AOMIN FUNDS 650440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP f 5 CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 1167 AFTER 96
PE NONE $
0
ROW NONE $
0
CONST 1996 $
64
_FED SHARE$
51
GA. SHARE$
_13
0TH SHARE$
PE 1992 ROW 1996 CONST.
UNDERWAY $ 544 AFTER 96
PE 1994 ROW LOCL CONST
$ 180 AFTER 96
CATOOSA 670810
HISTORIC RAIL DEPOT RESTORATION IN RINGGOLD MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY AOMIN FUNDS
PE LOCL
ROW LOCL
CONST 1995 $
35
FED SHARE$
28
GA. SHARE$
0TH SHARE$
7
,.
,,
I
...._ ,
~
~
~ ~
~
~
~
~
~
~
. ~..:Ji!
m:*\
'./.~....:-,--.,
~:;.-::.-::,::~
\:,';,:.,>~
.~~ r-~- "\-
'
'Ji.
COUNTY P,I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
16-Sep-1993 Page 47
FISCAL YEAR
COST ESTS
CHARLTON SR 852/FOLKSTON FM CR 138 NE ON NEW LOC TO US 1 521900 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .50 MANAGER: PETE BLOCKER
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1994
$
256
CONST 1994
$ 1925
FED SHARE $ 1540
GA. SHARE $ 385
0TH SHARE $
CHARLTON SR 40 E/FOLKSTON: l)EB MP 1.65-3.0; 2)WB MP 3.7-5.2
522350 ADDITION OF A PASSIN.G LANE. PROJECT MILEAGE : 2.85 MANAGER: PETE BLOCKER
CO.NG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$
13
AFTER 96
CHARLTON SR 94@ ST MARYS RIVER AT FLORIDA STATE LINE 531300 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : 1.00 MANAGER: PETE BLOCKER
CONG DIST. l
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY
$
2
AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LIS~ING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 48
COUNTY P, I.NO.
CHATHAM
DESCRIPTION PROJECT DATA
PROPERTY PURCHASE, FACILITY
EXP.,
8 TRANSIT COACHES,
FISCAL
COST
E-T-C-. ---------------C-OM--M-E-N-T-S---------------------------Y-E-A-R-.-------E-S-T-S--
505010 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 1 & 11
FUNDS RECIPIENT: CHATHAM AREA TRANSIT MANAGER: STEVE KISH
CAPITAL 1994
$ 4000
FUND SOURCE: URBAN TRANSIT DISC,
FED SHARE$ 3200
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$ 400
0TH SHARE$ 400
CHATHAM 505011
CAP. MAINT., VEHICLES, FACILTIY IMP., TOOLS, FURNITURE;. ETC
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH
<
CONG DIST .. l & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1995
$ 340
FED SHARE$
272
GA. SHARE$
34
0TH SHARE$
34
CHATHAM .505012
CAP. MAINT., VEHICLES, TOOLS, EQUIPMENT, FACILITY IMP., ETC TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH.
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$
370
FED SHARE$ 296
GA. SHARE$
37
0TH SHARE$
37
CHATHAM 505014
PUBLIC TRANSIT SERVICE FOR SAVANNAH AND CHATHAM COUNTY
TRANSIT PROJECTS/ OPERATIONS
.
FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
3473
1702 1702 3473
CHATHAM 505015
PUBLIC TRANSIT SERVICE FOR SAVANNAH AND. CHATHAM COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $
FED SHARE$ GA. SHARE $ 0TH SHARE$
4536 907 907
4536
CHATHAM 505016
PUBLIC TRANSIT SERVICE FOR SAVANNAH AND CHATHAM COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST, 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
4266 896 896
4266
CHATHAM 5V1010
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH
CONG DIST. 1 & 11
CAPITAL 1994
$
54
FUND.SOURCE: ELDERLY & QISABLED FUND FED SHARE$
43
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
6
0TH SHARE$
5
- ,.,
...
~
-
1!!18
~
~
~
~
~
~
~
~
fl
~-:::t::.::;:.i
/!t~:\:~:;t . i~:::::~~~~~
1;;.:1.~~
... .,,. riit>.l~i t-~-:-~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 49
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
(_ .
FISCAL
COST
-P--, -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
CHATHAM ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
5Vl011 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 1 & 11
FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA
CAPITAL 1995
$
56
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $.
45
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
0TH SHARE$
6
CHATHAM 5Vl012
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH
CONG DIST. 1 & 11
CAPITAL 1996
$
58
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
46
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
6
0TH SHARE$
6
CHATHAM 510936
SR 404/US 17A LANDSCAPING FOR TALMADGE MEMORIAL BRIDGE LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : ,00 ~EXIST.LANES: 0 /PROPOSED LANES: 0 MANAGER: E. LAWS
SAVANNAH TIP f 94-H-10 CONG DIST. 1 & 11
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
. 0
CONST 1994
$
750
FED SHARE$
600
GA. SHARE $
150
0TH SHARE$
CHATHAM 511010
I-95 TRUCK RAMP & WEIGH STATION JUST SOUTH/ SC LINE & 51Y010 WEIGH STATION/ RECST. OR REHAB. PROJECT MILEAGE : .38 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: RON BRAZIEL (C)
SAVANNAH TIP f 94-H-3 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1994
$
161
CONST 1994
$ 3212
FED SHARE$ 2570
GA. SHARE$
642
0TH SHARE$
CHATHAM 51102X
I-95 FM 0.8 MIS/US 17-BRYAN CO TO OGEECHEE.RVR/INCL RVR BRS
RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : .00
.
MANAGER: H. ASHMORE
CONG DIST, 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 511020 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1994
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
CHATHAM 511060
I-95@ CR 984/JIMMY DELOACH PKWY
INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CHURCH (M)
SAVANNAH TIP f 91-H-8
CONG DIST, 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL
CONST 1996 $ 6000 FED SHARE$ 4800 GA. SHARE$ 1200 0TH SHARE$
CHATHAM 511160
I-95 FM N/I-16 IN CHATHAM THRU EFFINGHAM TO S.C. SL;& 51Yl60 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 13.10 MANAGER: \. REYNOLDS
SAVANNAH TIP f 93-H-2 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL.HIGHWAY ADMIN FUNDS
PE 1994
$
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
396
0 23897 19118
4779
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 50
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-H-A-T-H-A-M----I--1-6--A-T--M-P--1--6-5-.1-,--1--6-4-.0--, --1-6-3-.-2-, --1-6-2-.-3-, --A-ND---I--5-1-6---IN-T-E-R-C-H-A-N--G-E------S-A-V-A-N-N-A-H--T-I-P--I--9-4--H----2-------------------PE---1-9-9-5-----$-----1-10
511180 BRIDGES/ RECST. OR REHAB.
CO~G DIST. 1
ROW NONE
$
0
PROJECT MILEAGE : .00
CONST
AFTER 96
MANAGER:
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 511200
I-16 FM I-95 TO END OF I-16@ MP 166.3 & LIGHT,SGN,WALLS GUARDRAIL/ TRAFFIC PROJECT MFLEAGE : 9.20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
'
CHATHAM 51Y010
I-95 TRUCK RAMP AND WEIGH STAT.; FOR IM FUND; SEE 511010
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CHATHAM 51Yl60
I-95 FM N/I~16 TO SC STATE LINE; FOR IM$; SEE 511160 UNKNOWN/ UNKNOWN . PROJECT MILEAGE .00 - EXIST.' LANES: 0 /PROPOSED LANES: 0
MANAGER:
CHATHAM 521495
SR 204/ABERCORN.ST@ SOUTHWEST BYP INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : 1.14 ._EXIST.LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS
CHATHAM 521505
HARRY S.TRUMAN PKY/PH IV FM WHITFIELD AVE TO MONTGOMERY X-RD CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.90 MANAGER: G. ROSS
SAVANNAH TIP I 94-H-1
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP f 91-H-14
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP I 87-H-10
CONG DIST. 1 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1994 $ 1234
FED SHARE$ 1234
GA. SHARE$
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994
$
350
FED SHARE$ 315
GA. SHARE$
35
0TH SHARE$
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$
0TH SHARE$
0 0 2500 2250 250
PE 1992
'
UNDERWAY
ROW LOCL
CONST 1996 $ 7297
FED SHARE$ 5838
GA. SHARE$ 1459
0TH SHARE$
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
CHATHAM 521508
HARRY S.TRUMAN PKY/PH III FM MONTGOMERY X-RD TO DERENNE AVE CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: G. ROSS
SAVANNAH TIP I 87-H-9,
CONG DIST._l & 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
,,
.....,
l!B
~
~
~
~
~
~
~
~
~
~~
I
~:~:.:;:,:~
~;-:~~:. ,,:
[(~:~?::~::!
1:.:x-n~~
~~'-A~ ~ ,,.
. . /:...., ...;,~~ ~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 51
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--, ---------------P-R-O--JE-C-T---D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHATHAM HARRY S TRUMAN PKWY FM S OF HENRY-ANDERSON TO PRESIDENT ST
SAVANNAH TIP f 87-H-8
PE 1992 UNDERWAY
521680 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
CONG DIST. 11
ROW LOCL
PROJECT MILEAGE : 1.70
CONST 1994
$ 29701
MANAGER: G. ROSS
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$ 23761
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 5940
0TH SHARE$
CHATHAM 52175X
US 17@ OGEECHEE RIVER/SEE BRYAN COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: M. REYNOLDS
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521755 IS AN ASSOCIATED PROJECT.
PE 1991 UNDERWAY
ROW NONE
$
0
CONST 1995 $
0
FED SHARE $
GA. SHARE $
0TH SHARE $
CHATHAM 521770
SR 26 FM BRYANWOOD RD TOW/BULL RIV INCLD BIKE LANE & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.94 MANAGER: G. ROSS
SAVANNAH TIP f 87-H-34 CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 52Y770 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1996 CONST
UNDERWAY $ 200 AFTER 96
CHATHAM 521780
SR 26/GARDEN CITY FM CR 704 TO SR 25/US 17;INCL CLVT EXT
TURN LANES/ TRAFFIC PROJECT MILEAGE : .70 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D, SMITH
SAVANNAH TIP f 90-H-8 CONG DIST. l
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$
100
CONST 1994
$
826
FED SHARE$
743
GA. SHARE$
83
0TH SHARE$
CHATHAM 521855
SR 26 FM 4-LN E/LYNES PKWY TO VICTORY DR/CS 188 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.38 MANAGER: G. ROSS
SAVANNAH TIP f 87-H-18b CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 5620 FED SHARE$ 4496 GA. SHARE$ 1686 0TH SHARE$ 2810
CHATHAM 521860
SR 25 FM 4-LN N/SR 204 NE TO SR 307(INCL PARALLEL BRIDGE) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.40 MANAGER: G, ROSS (C)
SAVANNAH TIP t 90-H-6
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL CONST 1996 $ 5976
FED SHARE$ 4781 GA. SHARE$ 1195 0TH SHARE$
CHATHAM 521865
SR 25/US 17 FM OGEECHEE RVR OFLW TO S/SR 204(& NEW BR) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.75 MANAGER: G. ROSS (C)
SAVANNAH TIP t 90-H-7
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521867 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW LOCL
CONST 1996 $ 4281
FED SHARE$ 3425
GA. SHARE$
856
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 52
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-HP-A-,IT-.H-NA-OM--. --SR---2-5/-U-S---17-/-0-C-EP-AR-NO--JE-HC-WT-Y-@-D-A-OT-AG-E-E-C-HEE---R-IV-E-R--O--V-ER-F-L-O-W--------------------SA-V-A-N-N--AC-HO-M-TM-IE-PN-T-St--9-0--H----7-------------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY
521867 REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES,
CONG DIST, 1
ROW LOCL
PROJECT MILEAGE : .05_ MANAGER: G. ROSS (C)
FUND SOURCE: BRIDGE PROGRAM
CONST 1996
$
445
FED SHARE$
356
FEDERAL HIGHWAY. ADMIN FUNDS
GA. SHARE$
89
521865 IS AN ASSOCIATED PROJECT.
0TH SHARE$
CHATHAM 52217X
SR 17/US 80 FM SR 27 TO CHERRY ST IN BLOOMINGDALE/EFFINGHAM RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.67 MANAGER: UNKNOWN
r:-
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 522170 IS AN ASSOCIATED PROJECT.
PE 1994 ROW 1996 CONST
$
0
$
0
AFTER 96
CHATHAM 522490
SR 26/US80 FM W OF BULL RIVER TOE OF LAZARETTO CRK/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 5.16 MANAGER: G. ROSS
SAVANNAH TIP f 93-H-3 CONG"DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL_HIGHWAY_ADM~N FUNDS
PE 1995 ROW CONST
$ 602 AFTER 96 AFTER 96
CHATHAM 522610
SR-25/US-17 OVER THE SAVANNAH RIVER REPLACEMENT OF THE EXISTING BRIDGES (S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:.
SAVANNAH TIP f.90-H-6 CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM F~QERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW C9NST
$ 150 AFTER 96 AFTER 96
CHATHAM 522670
RE-ROUTING SR 25/US 17 IN PORT WENTWORTH TO SR 30 RECONSTRUCTION & WIDENING, NO LANE ADDITION PROPOSED. PROJECT MILEAGE : ,94 MANAGER:
SAVANNAH TIP t 92-H-5
CON.G DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW CONST
$ , 15
AFTER 96 AFTER 96
CHATHAM 52Y770
SR 26 FM BRYANWOOD RD TO BULL RIV (SHOWN FOR BIKE FUNDS 33B) BICYCLE/PED. FACILITY/ RECST. OR REHAB. PROJECT MILEAGE: 1.94 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: G. BOULINEAU
CHATHAM 531260
SR 204 EB FM MP 2.0-3.2;WB MP 3.7-4.7 SE OF MELDRIM ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.20 MANAGER: PETE BLOCKER
SAVANNAH TIP f. 87-H-34 CONG DIST. 1
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS 521770 IS AN ASSOCIATED PROJECT.
SAVANNAH TIP f 92-H-7 CONG DIST. 1 .
FUND SOURCE: SURFACE TRANSPORT. FEDERAL..HIGHWAY ADMIN FUNDS
PE NONE ROW 1996 CONST
$
0
$
0
AFTER_ 96
PE 1992 UNDERWAY
ROW 1995 $
14
CONST 1996
$
660
FED SHARE $
528
GA. SHARE $ 132
0TH SHARE $
,.,,,,
. . ,
~
s.9
~
~ ~
'
~
~
JtfJ~
~
~
it:@.(:~s
~~.,
~~
,(t.''"'.'\:-!.
r,':,'.'7;~
,~~:~
.. ~. ~~
r::~:-.~~
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 53.
COUNTY
DESCRIPTION
FISCAL
COST
C-HP-A-. T-IH.-NA-MO--. -S-R--2-0-4-/A--B-E-R-C-O-R-NP-R-OS-T-JE-.C-T@--DE-IA-S-THA-E-N-H-O-W--ER---IN---SA-V-A-N-N-A-H----------------------SA-V-A-N--N-AC-HO-M-TM-IE-PN-T-Sf--9-4--R----5-------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--O
532510 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 1
ROW 1994 $ 300
PROJECT MILEAGE : .00 - EXIST. LANES: 7 /PROPOSED LANES: 8
CONST 1995 $ 133
MANAGER: PETE BLOCKER-
FUND SOURCE: RWY. SAFETY
FED SHARE$ 120
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
13
0TH SHARE$
CHATHAM 541900
SR 25 ALT/US 17@ GRAHAM ST IN SAVANNAH INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .40 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: PETE BLOCKER
SAVANNAH TIP f 93-H-1 CONG DIST. 11
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1994 $ 350
FED SHARE$ 315
GA. SHARE$
35
0TH SHARE$
CHATHAM 550460
STEPHENSON AVE/SAVANNAH FM ABERCORN ST TO WATERS AVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .85 MANAGER: BILL MOSKAL (C)
SAVANNAH TIP f 89-H-5 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
2181 1745
436
CHATHAM DIAMOND CSWY FM FERGUSON AVE TO MCWHORTER DR 550550 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
'.
PROJECT MILEAGE : 3.20
MANAGER: G. ROSS
SAVANNAH TIP f 92-H-3 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 1810 AFTER 96
CHATHAM 550560
WHITFIELD AVE FM OLD WHITFIELD RD TO FERGUSON AVE/ SAVANNAH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: G. ROSS
SAVANNAH TIP f 87-R-39 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
CHATHAM 570830
SURVEILLANCE AND MONITORING SYSTEM IN SAVANNAH CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. PROJECT MILEAGE : .00 MANAGER:
CHATHAM 570850
MCQUEENS ISLAND ABANDONED RAILROAD MULTIPURPOSE TRAIL BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KEITH GOLDEN
SAVANNAH TIP f 94-H-6 CONG DIST. 11
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
SAVANNAH TIP f 94-H-8 CONG DIST. 1 & 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1995
$
578
FED SHARE $ 520
GA. SHARE $
58
0TH SHARE $
PE LOCL
ROW LOCL
CONST 1995
$
440
FED SHARE$ 352
GA. SHARE$
0TH SHARE$
88
GEORGIA.DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 54
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-H-A-T-H-A-M---E-X--T-. -O-F--R-.--M-C-C-O-R-K-L-E--S-R--B-I-K-E-W-A-Y--O-N--W--IL-M--IN-G-T-O-N---IS-L-A-N-D----------------SA-V-A-N-N-A-H---T-I-P--f--9-4--H----9-------------------P-E--L-O-C-L-----------
570860 BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST. 11
ROW LOCL
PROJECT MILEAGE : . 00 - EXIST. LANES: .0 /PROPOSED LANES: 0
CONST 1996
$
110
MANAGER: KEITH GOLDEN
FUND SOURCE: TRANS. ENHANCE.
FED SHARE$
88
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
22
CHATHAM 570870
LANDSCAPING & RAILROAD YARDS & SHOPS/VISITOR CENTER REHAB MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - ,EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: KEITH GOLDEN
SAVANNAH TIP f 94-H~7 CONG DIST. 1 & 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
2450 1960
490
CHATHAM 570880
OLYMPIC LANDSCAPING IN SAVANNAH, 1994 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW LOCL
CONST 1994
$
625
FED SHARE$ 500
GA. SHARE$ 125
0TH SHARE$
CHATHAM 570890
OLYMPIC LANDSCAPING IN SAVANNAH, 1995 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
<.
CHATHAM 570900
OLYMPIC LANDSCAPING IN SAVANNAH, 1996
LANDSCAPING/ ENHANCEMENT
PROJECT MILEAGE : :oo - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
'
SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 $ ROW LOCL
CONST 1995 $ FED SHARE$ GA. SHARE$
0TH SHARE$
25
1094 875 219
PE 1996 $ ROWLOCL
CONST 1996 $ FED SHARE$ GA. SHARE $
0TH SHARE$
25
1094 875 219
CHATHAM 570910
BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 5/SEE 57Y910
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : 00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
O
ROW NONE' $
0
CONST 1994 $ 392
FED S~ARE $ 353
GA. SHARE$
39
0TH SHARE$
CHATHAM 570960
BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT f5/GLYNN BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 .- EXIST. LANES: 0 /PROPOSED LANES: 0. MANAGER: UNKNOWN .
CONG DIST. 1
FUND. SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROWNONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE $ ..
0 - O
1206 965 241
. ,
&
~
. li!IM ,,~
~
~
,ffiM
8kJi~~j
ftfiU.t,:,
~~.OE~
~l'.:JL~
~:.~:f.i,l
~
(iC?~~
f!!;~~..z~
ti:'i' ;:~ti
..'~~;; ,
.,.'~-
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
CHATHAM 57Y910
BRIDGE PAINT.ING PROJECT FOR FY 1994 - DISTRICT 5/SEE 570910
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
16-Sep-1993 Page 55
FISCAL YEAR
COST ESTS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
336
FED SHARE$
269
GA. SHARE$
67
0TH SHARE$
CHATHAM 81103X
CALL BOXES ON I-16 FROM SR 87/BIBB TO I-95/CHATHAM .. SEE BIBB
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 1 & 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
('
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 56
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA.
---------------------------------------
--------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE
3B1203 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 2
FUNDS RECIPIENT: CHATTAHOOCHEE
OPERATING 1994 $
40
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
22
GA. SHARE$
0TH SHARE$
18
CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE 3Bl204 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHATTAHOOCHEE MANAGER: STEVE KISH
t
CONG DIST. 2
OPERATING 1995 $
41
FUND SOURCE: RURAL TRANSIT
FED SHARE$
23
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
18
CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1205 TRANSIT FACILITIES/ OPERATIONS
FUNDS. RECIPIENT: CHATTAHOOCHEE MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1996 $
43
FUND SOURCE: RURAL TRANSIT
FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
19
CHATTAHO ONE CONV. VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS 3C2203 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHATTAHOOCHEE COUNTY MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1994
$
54
FUND SOURCE: RpRAL TRANSIT
FED SHARE$
43
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
0TH SHARE$
5
CHATTAHO SR 1@ HICHITEE CREEK 321580 . REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .30 MANAGER: M. REYNOLDS (C)
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322160 IS AN ASSOCIATED PROJECT.
PE 1990 UNDERWAY
ROW NONE $
0
CONST 1996 $ 865
FED SHARE$
692
GA. SHARE$ 173
0TH SHARE$
.,
..
. ,
1
ffiM
. PiM8 ,,~ ~ l ~ ~ Mn!ill@ !~(~;," I&~ ~ !*-'ki:',~:li lo/2"~";~
--::
;-::::~"-({-.:~:
~
-. ~-~
):-
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT.OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
16-Sep-1993 Page 57
FISCAL YEAR
COST ESTS
CHATTOOG US 27@ ARMUCHEE & LITTLE ARMUCHEE CRKS/SEE FLOYD CO 62107Z UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .06 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RAY METTS
PE NONE $
0
CONG DIST. 7
ROW NONE $
0
GRIP PROJECT
CONST 1994 $
0
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
621075 IS AN ASSOCIATED PROJECT.
0TH SHARE$
CHATTOOG SR 48 W/SUMMERVILLE EB/WB/TL MP 9.96-10.86;WB 11.7-12.05
621330 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.25 MANAGER: BILL MCVEY
CO~G DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
593
FED SHARE$ 474
GA. SHARE$
119
0TH SHARE$
CHATTOOG CR 1 NE OF TRION@ CHAPPEL CRK 670720 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .13 MANAGER: BILL MCVEY
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$
180
FED SHARE$
144
GA. SHARE$
36
0TH SHARE$
CHATTOOG CR 170/PENN BRIDGE RD OVER CHATTOOGA RIVER SE OF TRION 670750 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .15 MANAGER: BILL MCVEY
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 1079
FED SHARE$
863
GA. SHARE$ 216
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 58
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
-------------------------------.--------
----------------
------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE
6Bl338 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 9 & 6
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
f_
OPERATING 1994 $
83
FUND SOURCE: RURAL TRANSIT
FED SHARE$
49
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
34
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6Bl339 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
CONG DIST. 9 & 6
OPERATING 1995 $
87
FUND SOURCE: RURAL TRANSIT
FED SHARE$
51
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
36
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6Bl340 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
CONG DIST. 9 & 6
OPERATING 1996 .$
90
FUND SOURCE: RURAL TRANSIT
FED SHARE$
53
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
37
CHEROKEE ONE CONVERSION VAN AND ONE MINIBUS 6C2338 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
CONG DIST. 9 & 6
CAPITAL 1994
$
71
FUND SOURCE: RURAL TRANSIT
FED SHARE$
57
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
7
0TH SHARE$
7
CHEROKEE TWO CONVERSION VANS 6C2339 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE
MANAGER: STEVE KISH
CONG DIST. 9 & 6
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1995
$
57
FED SHARE$
46
GA. SHARE$
5
0TH SHARE$
6
CHEROKEE ONE MINIBUS 6C2340 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH
CONG DIST. 9 & 6
CAPITAL 1996
$
42
FUND SOURCE: RURAL TRANSIT
FED SHARE$
34
FEDERAL TRANSIT ADMIN FUNDS
- GA. SHARE $
4
0TH SHARE$
4
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl013 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY
MANAGER: STEVE KISH
CONG DIST. 9 & 6
CAPITAL 1994
$
16
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
f.
. .,
,.
gm
l!!!!!!!!J
~
,,
~
~
~
~
~'~~8
e~n
t:lf!..b,
~e-~
v..........;.~
r.::~::;:~:.)1
11,,K.~1
it . :.;~
.r: ..~ '
,. 'i
.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 59
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
-----------
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
COMMENTS
YEAR
EST$
--------------------------------.-------------------------
6V1014 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 9 & 6
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY
CAPITAL 1995
$
16
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: CHEROKEE COUNTY MANAGER: STEVE KISH
CONG DIST. 9 & 6
CAPITAL 1996
$
16
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
CHEROKEE I-75@ SR 92
610740 INTERCHANGE/ RECST. OR REHAB.
I
PROJECT MILEAGE : .45 - EXIST. LANES: 4 /PROPOSED LANES: 6
MANAGER: RAY METTS (M)
ATLANTA TIP I CH/R 108
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CON::r
UNDERWAY AFTER 96 AFTER 96
CHEROKEE I-575 SB ON RAMP FROM CR 416/TOWNE LAKE PARKWAY 610970 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CHEROKEE SR 92 FM WOODSTOCK RD TO CHEROKEE TRAIL 620920 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.75 MANAGER: RAY METTS (M)
ATLANTA TIP I CH 24
CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CH 3 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1996 $ 121
FED SHARE$ 109
GA. SHARE$
12
0TH SHARE$
PE 1996 ROW CONST
$
150
AFTER 96:
AFTER 96
CHEROKEE SR 92 FM I-75 TO WOODSTOCK RD 620940 RECONSTRUCTION & WIDENING.FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.59 MANAGER: RAY METTS (M)
ATLANTA TIP I CH 4
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW
CONST
$
150
AFTER 96
AFTER 96
CHEROKEE SR 92 FM E OF SR 754 TO OLD MOUNTAIN PARK RD/COBB 621200 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.10 MANAGER: RAY METTS
ATLANTA TIP f CH 20 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY .I\DMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$ 7192
CONST 1996 $ 8975
FED SHARE $ 7180
GA. SHARE $ 1778
0TH SHARE $
17
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 60
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P. I.NO.
PROJECT DATA
-- CHEROKEE SR 140 REL FM CR 311 NW TO CR 375;THEN NEW LOC TO CR 765
621240 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.30
MANAGER: RAY METTS _(M)
FISCAL
COST
-------AC--TOL-NA-GN---TDA-CIO-SM-TT-MI. P-E-6N-f.T-S-CH---.5---------------------RO-PW-EY-E-A1-R9-9-2-----AU-NEF-TDS-TEER-RSW--A9Y6
CONST
AFTER 96
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
CHEROKEE SR 92 FM CHEROKEE TRAIL TO CANTON HWY/SR 754 621390 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10
MANAGER: N. PASSMORE (M)
ATLANTA TIP f CH 9 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$ 3712 AFTER 96
CHEROKEE CANTON HWY FM PALM RD/CR 351 TON/SIXES RD [INCL RR BR) 630673 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
PROJECT MILEAGE: .37 MANAGER: .BILL MCVEY
CHEROKEE SR 140 FM SR 5 BUS TO LOWER BURRIS RD NORTH OF CANTON 630942 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.22 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f CH2 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 63Y673 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CH .7
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY ROW LOCL CONST 1996 $ 500
FED SHARE$ 400 GA. SHARE$ 100 0TH SHARE$
PE 1992 ROW_
CONST
UNDERWAY
AFTER 96 AFTER :96
CHEROKEE CR 770/BELLS FERRY RD FM CR 421 TO CR 1012 630945 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.00 MANAGER: H. ASHMORE
r.
CHEROKEE CR 770/BELLS FERRY RD NEW PARALLEL BR@ LITTLE RIVER 630975 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .21 MANAGER: H. ASHMORE
CHEROKEE CR 770/BELLS FERRY RD FM CR 1012 TON OF N/VICTORIA RD 630977 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.90 MANAGER: H. ASHMORE(M)
ATLANTA TIP t CH 1
CONG DIST. 6 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I.CH 18 CONG DIST. 6 -
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t CH .10
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW LOCL
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
o
2182 1746
186 250
-
PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 5526 FED SHARE$ 4421 .
GA. SHARE$ 1105 0TH SHARE$
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
,.
. ,
~
-= ~
~ ~
~
~'~~
~
ttt:.;~,lii;~
~=~:.:::et1
~'ili!ltl
tx~-~~
~': .. ::
tr~-~
I': ::,~
.. ~~ .,
. ;~;...... ~~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 61
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-PH-E-. RI-.O-NK-O-EE-. -S-R--5-B--/S-R--1-4-0--F-MP-R-O5---JLE-NC-T--SD-O-A-TFA--H-I--SC-H-O--O-L--N--T-O-E---O-F--H-O-S-P-IT-A--L--D-R---------A-T-LA--N-T-AC-O-MT-MI-PE-N-fT-S-C-H--1-6---------------------P-EY-E-A1-R9-9-2-----U-EN-DS-TER-SW--AY
631000 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 9
ROW 1991
UNDERWAY
PROJECT MILEAGE : 1.15
CONST 1994
$ 1839
MANAGER: K FULBRIGHT
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 1471
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
368
0TH SHARE $
CHEROKEE CR 1061/CANTON HWY FM END OF MULTI-LN N/I-575 TO SR,20 631130 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.77
MANAGER: M GANNAWAY (M)
ATLANTA TIP f CH 6 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
ROW LOCL CONST
UNDERWAY AFTER 96
CHEROKEE SR 5 BUS FROM HOSPITAL DR/CS 657 NE TO I-575/SR 5 631150 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.21 MANAGER: K FULBRIGHT (M)
ATLANTA TIP f CH 8 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
CHEROKEE CR 772/KELLOG CREEK RO @ KELLOG CREEK 631215 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .15 MANAGER: H. ASHMORE
CHEROKEE SR 140/CANTON-ROSWELL RD AT CR 297/EARNEY RO & CR 311/MTN RO 631390 INTERSE.CTION IMPROVEMENT / TRAFFIC
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CHEROKEE SHOWN FOR STP FUNDS ONLY ..... SEEP.I. 630673 63Y673 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BILL MCVEY
(_
CHEROKEE SR 20@ SR 372 641701 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .12 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: BILL MCVEY.
ATLANTA TIP f CH 19 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
ATLANTA TIP f CH 25 CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CH 2 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630673 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f CH 15 CONG DIST. 6 & 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 749 FED SHARE$ 599 GA. SHARE$ 150 0TH SHARE$
PE NONE $
0
ROW 1994 $ 275
CONST 1994 $ 418
FED SHARE$
376
GA. SHARE$
42
0TH SHARE$
PE 1994
UNDERWAY
ROW 1985 UNDERWAY
CONST 1996 $ 321
FED SHARE$ 257
GA. SHARE$
64
0TH SHARE$
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
285
FED SHARE$ 257
GA. SHARE$
29
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 62
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
----------------------------------------
------------------------
.--------------C-O-M-M--E-N-TS---------------------------Y--EA-R---------E-S-T-S--
CHEROKEE BELLS FERRY RD FM COBB CO LINE TO PINE RIDGE DR
ATLANTA TIP f CH 13
PE NONE $
0
650370 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 6
ROW LOCL
PROJECT MILEAGE : 1.43
CONST 1994
$ 3401
MANAGER: H. ASHMORE
_FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 2721
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
680
0TH SHARE$
CHEROKEE CR 770/BELLS FERRY RD FM PINE RIDGE DR TO BASCOMB CARMEL RD
650375 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.01 MANAGER: H. ASHMORE
ATLANTA TIP f CH 14 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW LOCL
CONST 1994
$.
FED SHARE$
GA. SHARE$
0TH SHARE$
0
2178 1742
436
CHEROKEE HISTORIC TRAIN DEPOT RESTORATION IN HOLLY SPRINGS 670840 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
ATLANTA TIP f CH 22 CONG DIST. 6 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996
$
175
FED SHARE$
140
GA. SHARE $ '
0TH SHARE$
35
CHEROKEE HISTORIC DEPOT RESTORATION IN WOODSTOCK & SIDEWALKS 670850 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ATLANTA TIP f CH 23 CONG DIST. 6 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONSTl995
$
125
FED SHARE$
100
GA. SHARE$
0TH SHARE$
25
CHEROKEE SR 140 FM RANCHETTE RD TO CR 311:BR@ LITTLE RVR/SEE FULTON
72130X UNKNOWN/ UNKNOWN. PROJECT MILEAGE : .05 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: RAY METTS
ATLANTA TIP t FN 13 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721305 IS AN ASSOCIATED PROJECT.
PE 1991 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
CHEROKEE SR 140/HOUZE RD@ LITTLE RIVER@ CHEROKEE CO LINE 72130Z REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: RAY METTS
ATLANTA"TIP t FN 13
CONG DIST. 6
. FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721308 IS AN ASSOCIATED PROJECT .
PE 1991 ROW LOCL CONST
UNDERWAY AFTER 96
., ,.
'
., ,
'...-:o.
~
~
~ ~
~.3
~
~ ..:J.,,.t/' ,;;.:...i:,
~g:~~
==..;:;;::,
c~y,?:1
pJi:i!!.il
:~~.~~
h~!~~
r;~to-t:~1
ii-:;:)
~
.
..,, ~ \ _, ._. I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 63
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O-.----------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-ST--S--
CLARKE MULTI-MODAL TRANSP. CTR, VEHICLES, CAP. MAINT., REPAIRS, ETC
101010 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 10
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
CAPITAL 1994
$ 1707
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$ 1366
, '
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
171
0TH SHARE$
171
CLARKE 101011
VEHICLES, CAP. MAINT., REPAIRS, SIGNS, POLES, SHELTERS, ETC.
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1995
$ 357
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$ 286
FEDERAL TRANSIT,ADMIN FUNDS
GA. SHARE$
36
0TH SHARE$
36
CLARKE 101012
VEHICLES, CAP. MAINT., SHELTERS, BUS SIGNS, POLES, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1996
$ 425
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
340
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
43
0TH SHARE$
43
CLARKE ADA EQUIPMENT FOR BUSES - PUBLIC ADDRESS, PHONE, VOICE SYST.
101013 TRANSIT PROJECTS/ CAPITAL
.
CONG DIST. 10
FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM
CAPITAL 1994
$
58
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
52
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
CLARKE 101014
ADA EQUIPMENT FOR BUSES - VOICE ANNUNCIATION SYSTEMS
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1995
$
11
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
10
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
CLARKE 101016
PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE-KISH
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994 $ FED SHARE$
GA. SHARE$ 0TH SHARE$
1050 525
525
CLARKE 101017
PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
1100 550
550
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
CLARKE 101018
PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIEN.T: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST .. 10
FUND SOURCE: URBAN TRANSIT F~DERAL TRANSIT ADMIN FUNDS
16-Sep-1993 Page 64
FISCAL YEAR
COST ESTS
.---------------- ----------
OPERATING 1996 $ . , FED- SHARE $
GA. SHARE$ 0TH SHARE$
1300 364 1 937
CLARKE 1Vl010
ELDERLY AND DISABLED'VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1994
$
15
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
12
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
CLARKE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
(
lVlOll TRANSIT PROJECTS/ CAPITAL
CONG DIST. 10
FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
CAPITAL 1995,
$
15
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
12
(.
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
CLARKE 1Vl012
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1996
$
16
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
CLARKE 121970
CR 600/DANIELSVILLE RD FM 4-LN NEAR CR 109 TO CR 107/HULL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .43 MANAGER: L. OWENS
ATHENS TIP f II-01-2 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
CLARKE 121990
PRINCE AVE FM S/SR 8 TO 600' N/CSX RR BR ON JEFFERSON ST INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE: .50 - EXIST. LANES: 4 /PROPOSED LANES: 8
MANAGER: L. OWENS
CLARKE 122160
SR 15 ALT/US 129 FM LAVENDER DR IN CLARKE CTY TO SR 330 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.71 MANAGER: RON BRAZIEL (M)
ATHENS TIP f II-01 CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122350 IS AN ASSOCIATED PROJECT.
ATHENS TIP f II-02-2
CONG DIST. 19
.
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1994
$. 2197
FED SHARE $ 1758
GA. SHARE $
439
0TH SHARE $
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
.. ....
' _;;
,. "'
., ..
. '
'P
--
MM
M!8
~
== { ~
~
~L~
~~
lfth11i
~:r;.11:"tij
~:.~
.Wi~~
(.!::;~;~1
,~!t'!
i:i:.::":U
~:f:.-:'.~
.i:.-;.v.....:~\~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 65
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-PL-A-. R-I.K-NE-O--. -S-R--1-5-/-P-R-I-N-C-E--A-P-VR-EO-/N-JE-CA-T-TH-D-ENA-ST-A--B-Y-P-@---C-SX---R-R----------------------------A-T-H-E-N-S-C-OT-MI-PM-E-fN-T-SI-I--0-2-----------------------P-EY-E-A1-R9-9-2-----U-NE-DS-ETR-SW--AY
122350 REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 6 LANES.
CONG DIST. 10
ROW NONE
$
0
PROJECT MILEAGE : .10
CONST 1994
$
350
MANAGER: L. OWENS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE. $ 280
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
70
121990 IS AN ASSOCIATED PROJECT.
0TH SHARE $
CLARKE 12257Z
SR 10/US 78 MONROE TO ATHENS, MEDIAN OPENINGS; SEE WALTON
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
0
ROW NONE $
0
CONST 1994
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
CLARKE 122600
SR !OLP/ATHENS BYPASS NB ON & OFF RAMPS TO WINTERVILLE RD
RAMP/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 2 MANAGER: L. OWENS (M)
ATHENS TIP f III-OS CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW 1996 CONST
$
10
$
10
AFTER 96
CLARKE 122680
SR 8/US 78@ HUNTINGTON RD AND ATHENS BYPASS
r
INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : ,53 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. OWENS
CLARKE 13234Z
SR 10 FM ALCOVY RIVER/WALTON THRU OCONEE TO SR 8/CLARKE GUARDRAIL/ TRAFFIC PROJECT MILEAGE : 10.10 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CLARKE 15021X
EPPS BRIDGE RD@ MCNUTT CREEK ... SEE OCONEE UNKNOWN/ UNKNOWN PROJECT MILEAGE : ,00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: UNKNOWN
CLARKE 15021Y
CR 473/EPPS BR RD FM SR 10/0CONEE TO US 78 ... SEE OCONEE UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1994
$
150
CONST 1994
$
450
FED SHARE $
405
GA. SHARE $
45
0TH SHARE $
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
ATHENS TIP f II-03
PE NONE $
0
CONG DIST. 10
ROW LOCL
CONST 1995 $
0
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
150215 IS AN ASSOCIATED PROJECT.
0TH SHARE$
ATHENS TIP f II-03
PE NONE $
0
CONG DIST. 10
ROW LOCL
. CONST 1995
$
0
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
FEDERAL.HIGHWAY ADMIN FUNDS
GA. SHARE$
150210 IS AN ASSOCIATED PROJECT.
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 66
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
C-JL-.A->R-,IK-,NE-O--. -T--R-A-IL-S--A-L-O-N-G--O-PC-RO-O-N-EJE-EC-T-R-IV-D-A. -TA-IN---U-G-A--E-.--C-A-M-P-U-S---E-X-P-A-N-S-IO--N--A-R-E-A----------A-T-H-E-N-S-C-OT-MI-PM-E-IN-T-VS---0-2-----------------------P-EY-E-AL-OR-C-L------E-S-T-S--
-170920 BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST. 10
ROW LOCL
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
886
MANAGER: UNKNOWN
FUND SOURCE: TRANS, ENHANCE.
FED SHARE$
709
FEDERAL HIGHWAY ADHIN FUNDS
GA. SHARE$
0TH SHARE$
177
CLARKE 170925
BIKEWAY/LANDSCAPING ON EPPS BRIDGE ROAD IN ATHENS BICYCLE/PED. FACILITY/ ENHANCEMENT . PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: H. ASHMORE
ATHENS TIP I V-01
CONG DIST, 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1995 $ 675
FED SHARE$
540
GA. SHARE$
0TH SHARE$
135
CLARKE 170960
LUMPKIN ST/ BAXTER ST SIGNAL SYSTEM IN ATHENS SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
CLARKE 170970
ATHENS CBD SIGNAL SYSTEM
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
ATHENS TIP I III~02
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATHENS TIP f III-04 CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
95
FED SHARE$
86
GA. SHARE$
10
0TH SHARE$
'
PE NONE $
0
ROW NONE .$
0
CONST 1996 $ 220
FED SHARE$
198
GA. SHARE$
22
0TH SHARE$
cLARKE 170980
REALIGNMENT OF RIVERBEND RD FM MILLEDGE AV TO COLLEGE STA RD
MINOR WIDEN & RESURF / TRAFFIC PROJECT MILEAGE : 1.40 ~EXIST.LANES: 2 /PROPOSED LANES: 2
MANAGER: L. OWENS
ATHENS TiP f III-01 CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1994 $ 130
FED SHARE$
117
GA. SHARE$
13
0TH SHARE$
CLARKE 171015
BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT fl BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
(_
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 517
FED SHARE$
414
GA. SHARE$ 103
0TH SHARE$
...
t
..
I 0
'V5-
9IIJl!!!I
~ ffl!!!!!1 I!!!!!! 91!!.!
~
~
~
t~~1'J
~
~.:;hi@'
a::..,:;:,~
'
t!t:!'.!:~2
/ffe,~
~;~~:>.~
r~,XJ'..!l
';.'..!C:<.'.;i
~~]
t:;
.
...; ..
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 67.
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLAY
COUNTY OPERATED PUBLIC TRANSIT SERVICE
4B1263 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 2
FUNDS RECIPIENT: CLAY
OPERATING 1994
$
51
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
31
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
20
CLAY 4B1264
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH
CLAY 4B1265
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1995 $
53
FUND SOURCE: RURAL TRANSIT
FED SHARE$
32
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
21
(
CONG DIST. 2
OPERATING 1996 $
55
FUND SOURCE: RURAL TRANSIT
FED SHARE$
33
FEDERAL TRANSIT ADMIN FUNDS
.GA. SHARE $
0TH SHARE$
22
CLAY 4C2263
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
CLAY 4C2264
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1995
$
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
3
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
16-Sep-1993 Page 68
FISCAL YEAR
COST ESTS
CLAYTON 7Vl010
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
CONG DIST. 3
CAPITAL 1994
$
26
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
21
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
3
CLAYTON 7Vl011
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
CONG DIST. 3
CAPITAL 1995
$
27
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
22
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
2
0TH SHARE$
3
CLAYTON 7Vl012
ELDERLY AND DISABLED-VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
CONG DIST. 3 .
CAPITAL 1996
$
28
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
22
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
CLAYTON 31097X
I-75 FM I-675 TO SR 7/US 41/HENRY (NOISE BARR. & LIGHTING) WALLS/ RECST. OR REHAB. PROJECT MILEAGE : 7.80 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: J. GRAYBEAL
(
ATLANTA TIP f CL-R 12 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 310976 IS AN ASSOCIATED PROJECT.
PE 1996 ROW NONE CONST
$
0
$
0
AFTER 96
CLAYTON 32205X
SR 42 FM SR 138/HENRY TO I-675 NB RAMPS .. SEE HENRY CO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: H. REYNOLDS
ATLANTA TIP f CL64/HE5 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 322050 IS AN ASSOCIATED PROJECT.
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
CLAYTON 712420
1-75 FM US 41/0LD DIXIE HWY TO I-285/INCL BR & FNTGE RDS RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.
PROJECT MILEAGE : 5.90 MANA;ER: J. GRAYBEAL
ATLANTA TIP t CL-R.11
CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1988 UNDERWAY
ROW 1991 UNDERWAY
(. CONST 1994
$ 17499,
FED SHARE $ 13999
GA. SHARE $ 3500
0TH SHARE $
CLAYTON 712425
1-75 FM SR 3/US 41/0LD DIXIE HWY TO I-285 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 2.90 MANAGER: J. GRAYBEAL (M)
ATLANTA TIP f.CL-R 11 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
I>
PE 1996 ROW CONST
$ 1000 AFTER 96 AFTER 96
,. ,.
..
't.
;{1111
~
.. -.. ~ ~
l!!!!!l!!I!'!
~
~
~
~
~
.l!l,!!,!.t~,!'ll
~.
l'!;~l':;.:i
F~~
-!-~t7"'.-~
~
.. ., ~
],;-:-- ....
'
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 69
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLAYTON I-285@ CONLEY ROAD
ATLANTA TIP f CL 4
PE 1988 UNDERWAY
712430 BRIDGES/ RECST, OR REHAB.
CONG DIST. 3
ROW LOCL
PROJECT MILEAGE :' .10
CONST
AFTER 96
MANAGER: G, ROSS
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 712602
LEE STREET IN MORROW OVER I-75
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : ,08 MANAGER: J. GRAYBEAL(CM)
ATLANTA TIP f CL 59 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
CLAYTON 712630
I-75/MORROW@ SR 54 (INCL RR BRIDGE OVER I-75) INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .23 - EXIST. LANES: 4 /PROPOSED LANES: 8 MANAGER: J. GRAYBEAL(CM)
CLAYTON 712970
HOV LN SIGNING ON I-75 & I-85 METRO/FUL;COBB;GWIN
HOV LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
CLAYTON 713050
I-675, I-75, I-20: IMPACT ATTENUATORS&BARRIER WALL AT BR. IMPACT ATTENTUATORS / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CLAYTON 713090
I-85 NB 62 SIGNS FROM I-285 TO SR 166 LAKEWOOD FWY .. FULTON
SIGNING/ MAINTENANCE
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
r..
CLAYTON 713110
I-75, VAR LOC FROM I-285 SOUTH TO BARRETT PKWY .. FUL-COBB
PVMNT MARKINGS/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
ATLANTA TIP f CL-R 31 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
ATLANTA TIP i R 73
CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t R 130
CONG DIST. 3 & 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS
ATLANTA TIP f R 130 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS 71309Z IS AN ASSOCIATED PROJECT.
ATLANTA TIP t R 130
CONG DIST. 5
..
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71311X IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 6221
FED SHARE$ 6221
GA. SHARE$
0TH SHARE$
PE 1994
UNDERWAY
ROW NONE $
0
CONST 1994 $ 1000
FED SHARE$ 1000
GA. SHARE$
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 223
FED SHARE$ 223
GA. SHARE$
0TH SHARE$
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 615 615
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 70
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P-.I-.-N-O--.----------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLAYTON I-75 FM US 41/0LD DIXIE HWY TO I-285; TO SHOW IM FUNDS
ATLANTA TIP f CL-Rll
PE NONE $
0
71Y420
RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.
PROJECT MILEAGE 5,90
MANAGER:
.
CONG DIST. 3 FUND SOURCE: I-STATE HAINT.
ROW NONE $
CONST 1994
$
FED SHARE$
0
6501 5851
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
650
0TH SHARE$
CLAYTON 720815
SR 42 FM LAKE HARBIN RD N TO ANVIL BLOCK RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.52 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f, CL 12 CONG DIST. 3
F~ND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 731090 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1996.
CONST
UNDERWAY
$
975
AFTER 96
CLAYTON 720817
SR 42/HACON HWY@ UPTON CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .OO MANAGER: M. REYNOLDS .(M)
ATLANTA TIP f CL 79 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1996
$
155
FED SHARE $
124
GA. SHARE $
31
0TH SHARE $
'CLAYTON 721040
SR 54 (& FAYETTE CO) @ MORNING & CAMP CRKS; & FLINT RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .70 MANAGER: D. GODWIN
ATLANTA TIP f CL23/FY2
CONG DIST. 3 ,
.
FUND SOURCE: BRIDGE PROGRAM
FEDERA.L HIGHWAY ADMIN FUND. S
PE 1986 UNDERWAY
ROW 1994
$
552
CONST 1995 $ 3246
FED SHARE $ 2597
GA. SHARE $
649
0TH SHARE $
CLAYTON 721270
SR 42/HACON HWY FM S/ANVILBLOCK RD TO OLD TONY RD/DEKALB RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.30 MANAGER: M, REYNOLDS
ATLANTA TIP f CL10/DK8
CONG DIST. 3 & 11
FUND SOURCE: SURFACE T~SPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1992 UNDERWAY
CONST 1996
$ 4235
FED SHARE $ 3388
GA. SHARE $
847
0TH SHARE $
CLAYTON 721290
SR 85 FM SR 279/FAYETTE N TO 6-LN@ ROBERTS DR/CLAYTON RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE: 4.10 MANAGER: K FULBRIGHT (M)
ATLANTA TIP f CL15/FY4
CONG DIST. 3
.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 1600 AFTER 96
CLAYTON 721295
SR 85 NBL@ CAMP CREEK@ FAYETTE CO LINE
REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : .03
'
MANAGER: K FULBRIGHT (M)
ATLANTA TIP f CL 77 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1996
$
294
FED SHARE $
235
GA. SHARE $
59
0TH SHARE $
.
! r\ll
(O
,,
.... ~,p
~
1!!!!!!!!!!111
. -~ ~
II,
., ... }
"@R
~
= ~
~
~ .i!L~ ~ ~
--,
"'
~
b~
l<.'..i.L'..;,"-i
~
. ~~~~~i
1'.~.~H '.~'!
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 71
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I,NO.
C-L-A-Y-T-O-N-
PROJECT DATA
S-R---1-3-8--FM---W-A-L-T--S-TEP-H-E-N--S--R-D--E-AST
TO--I--7-5-/H--E-N-R-Y---CO-------------------A-T-LA-N--TA-C-O-MT-MI-PE-N-fT-S-C-L--3-1---------------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY
721480 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 3
ROW 1996 $ 5180
PROJECT MILEAGE : 3.55
CONST
AFTER 96
MANAGER: RON BRAZIEL (M)
"FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 721550
SR 85 FM ADAMS DR TO RAMP@ I-75/INCL INTCH@ FOREST PKWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 3.10 MANAGER: N. PASSMORE (M)
ATLANTA TIP f CL 14 CONG DIST. 3 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AFTER 96 AFTER 96
CLAYTON 721555
SR 85@ SR 331 & I-75 RAMP INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
CLAYTON 721860
TARA BLVD@ I-75 (GATEWAY PROJECT) LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST.-LANES: 6 /PROPOSED LANES: 6
MANAGER: J. GRAYBEAL (C)
CLAYTON 731050
SR 85 AT SR 138 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GODWIN
CLAYTON 731060
SR 85 AT VALLEY HILL ROAD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: D. GODWIN.
CLAYTON 731070
TARA BLVD AT OLD DIXIE HWY INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GODWIN
ATLANTA TIP f CL 82 CONG DIST. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 122 CONG DIST. 3 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 80 CONG DIST. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 81 CONG DIST, 3 & 5 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 84 CONG DIST. 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1994 $ 904
FED SHARE$ 814
GA. SHARE$
90
0TH SHARE$
PE NONE $
0
ROW NONE $"
0
CONST 1994
$
120
FED SHARE$
96
GA. SHARE $-
36
OTH SHARE$
60
PE NONE $
0
ROW 1994 $
77
CONST 1995 $ 165
FED SHARE$ 149
GA. SHARE $
17
0TH SHARE$
PE 1994 UNDERWAY
ROW 1994
$
33
CONST 1995 $ 243
FED SHARE $ 219
GA. SHARE $
24
0TH SHARE $
PE 1994 UNDERWAY
ROW 1994
$
61
CONST 1994
$
271
FED SHARE $
271
GA. SHARE $
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 72
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
----------------------------------------------------------------------------
----C-OM--M-E-N-TS----------------------------Y-EA--R--------E-S-T-S--
CLAYTON SR 42 AT DOUBLE BRIDGE ROAD
ATLANTA TIP I CL 88
PE NONE $
0
731090 INTERSECTION IMPROVEMENT / TRAFFIC
(
CONG DIST; 3
ROW 1994
$
50
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
CONST 1994
$
300
MANAGER: D. GODWIN
..
FUND SOURCE: HWY. SAFETY
_ FED SHARE $ 270
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
30
720815 IS AN ASSOCIATED PROJECT.
0TH SHARE$
CLAYTON 731400
SR3/US19&41/TARA BLVD AT CR 537/FREEMAN RD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .31 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP I CL 92 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE- NONE
$
0
ROW NONE $
0
CONST 1994
$
154
FED SHARE$
154
GA. SHARE$
0TH SHARE$
CLAYTON 751730
CR 1342/BATTLE CREEK RD@ JESTERS CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: D. GODWIN
ATLANTA TIP I CL 17 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1991
UNDERWAY
ROW LOCL
CONST 1996
$
409
FED SHARE$ 327
GA. SHARE$
82
0TH SHARE$
CLAYTON 751760
MT ZION RD FM SR 54 SE TO MT ZION BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.45 MANAGER: J. GRAYBEAL (C)
ATLANTA TIP I CL 18 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
10
AFTER ~6
CLAYTON 751770
BATTLECREEK-MT.ZION FM SOUTHLAKE PKWY TO LAKE HARBIN RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.63 MANAGER: J. GRAYBEAL (C)
ATLANTA TIP f CL 19 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$'
10
AFTER 96
CLAYTON 751775
BATTLE CREEK RD FM VALLEY HILL RD TO SOUTHLAKE PKWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.98 MANAGER: D. GODWIN -
ATLANTA TIP I CL 17
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
10
AFTER 96
CLAYTON 751790
PANOLA RD FM BOULDERCREST RD TO STAGECOACH RD RECONSTRUCTION'& WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.10 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f CL16/HE4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
10
AFTER 96
,.
~
' '
~
'
,
,,")
~
!lJ!!l!!!ll
M!!l!!I l!!J!!lll!l!!!I
Si!!!!.WJ
"
~
~
~
~
~
.~Jft.t.~ .,
f:lt!t~~
~ ....
~
(fi~;:,tii
r~:f;i~t..~
k'. :.:,;!l~
..... i;.> .!:::
T'~:'~
;.:, ,.
,\.,,~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 73
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CLAYTON ANVILBLOCK RD FM END OF WIDENED SECTION E TOBOULDERCREST RD
ATLANTA TIP f CL .60
PE 1996 $
10
751800 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 3
ROW LOCL
PROJECT MILEAGE : .63
CONST
AFTER 96
MANAGER: D. GODWIN
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 751810
FLINT RIVER RD FM WEBB DR TO TARA BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2.71 MANAGER: D. GODWIN
ATLANTA TIP f CL 20 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
10
AFTER 96
CLAYTON 751850
SR 314/FAYETTE'LE RD FM SR 279 TO NORMAN DR/CR 255 .. FAYETTE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 5.63 MANAGER: M GANNAWAY (M)
1.
CLAYTON 751855
SR 314/FAYETTEVILLE RD FM NORMAN DR/CR 255 TO SR 139 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.53 MANAGER: M GANNAWAY (M)
ATLANTA TIP f CL5/FY8 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 75185X IS AN ASSOCIATED PROJECT.
ATLANTA TIP f CL62/CL5 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$ . 250 AFTER 96
AFTER 96
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
CLAYTON 752060
MORROW RD/CR 1348@ JESTER'S CREEK REPLACEMENT OF .THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .20 MANAGER: D. GODWIN
CLAYTON 752180
CONLEY RD FM OLD DIXIE HWY/SR 3 TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.70 MANAGER: G. ROSS
ATLANTA TIP f CL 78 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 74 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 196
FED SHARE$
157
GA. SHARE$
39
0TH SHARE$
PE 1995 ROW LOCL CONST
$
51
AFTER 96
CLAYTON 752240
FOREST PARKWAY@ GERMAIN INDUSTRIAL BLVD WEST OF SR 42 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .45 - EXIST. LANES: 2 /PROPOSED LANES:. 2
MANAGER: D. GODWIN
ATLANTA TIP f CL 86 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW LOCL
CONST 1995 $ 295
FED SHARE$ 266
GA. SHARE$
30
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 74
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
COMMENTS
FISCAL YEAR
COST ESTS
- - CLAYTON JESTERS CK GREENWAY FM JONESBORO TO MORROW
--------A-T-L-A-N--TA---T-IP---f --C-L--8-9 ---------------------P-E--L-O-C-L-----------
770460 BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST.-;3
ROW LOCL
PROJECT MILEAGE : 4.00.- EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1995 $ 1734
MANAGER:.UNKNOWN
FUND SOURCE: TRANS. ENHANCE.
FED SHARE$ 1387
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
347
CLAYTON 770500
HISTORIC DEPOT RESTORATION IN JONESBORO MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
ATLANTA TIP f CL 90 CONG DIST .. 3
FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996 $ . 94
FED SHARE$
75
GA . SHARE $
0TH SHARE$
19
CLAYTON 770600
TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN CLAYTON COUNTY r:-
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
ATLANTA TIP f CL 94 CONG DIST. 3
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
50
ROW NONE $
0
CONST 1995 $ 450
FED SHARE$ 360
GA. SHARE$
0TH SHARE$
90
,. .1 .,
...
...
~-"t
I!!!!!!!!!!
1!!11!!!!!!!1
,P-m
'
~ ,,
COUNTY P. I.NO.
~
~
~
DESCRIPTION PROJECT DATA
~
~
= ~
~
r'
e;~:id
~
~.i(.::.:~
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
i: ~r~
..I...::
,~~
16-Sep-1993 Page 75
FISCAL YEAR
COST ESTS
CLINCH 422055
SR 38/US 84@ SUWANNOOCHEE CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: N. PASSMORE (M)
CONG DIST. 8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 422050 IS AN ASSOCIATED PROJECT.
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
CLINCH 431065
SR 187@ SUWANNOOCHEE CRK OFLW S/HOMERVILLE
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES ..
PROJECT MILEAGE : 1.00
(_
MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992. UNDERWAY
ROW 1994
$
1
CONST 1995 $
275
. FED SHARE $
220
GA. SHARE $
55
0TH SHARE $
CLINCH 43106X
SR 187@ SUWANNOOCHEE CRK/SEE ECHOLS COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 431060 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1994
$
0
CONST 1995
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
GEORGIA DEPARTM_ENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 76
PROJECT LISTING BY COUNTY FY 1994/FY 1996
------ COUNTY P, I.NO. COBB
DESCRIPTION
PROJECT DATA
- - ---
-
PERMANENT OPERATIONS/MAINT,
FACILITY
DEVEL-O-P-M--EN-T
--
FISCAL
COST
PHAS-E---I -------------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
7D7014 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 7 & 6
FUNDS RECIPIENT: COBB COUNTY MANAGER: STEVE KISH
CAPITAL 1994
$ 2725
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$ 2180
FEDERAL TRANSIT ADMIN FUNDS
GA, SHARE$ 273
0TH SHARE$
273
COBB 7D7027
PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS./ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
2594 1297
1297
COBB 7D7028
BUS PURCHASES, P & R LOT DEV., TRANSFER FACILITY, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
6157 4926
616 616
COBB 7D7029
TRANSIT COACHES, PARATRANSIT BUSES, AND PLANNING PROJECTS
TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: COBB COMMUNITY TRANSIT
r.
MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
2736 2189
328 219
COBB 7D7030
TRANSIT COACHES, PARATRANSIT BUSES, AND PLANNING PROJECTS TRANSIT-PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
2736 2189
328 219
COBB 7D7044
PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995
$
896
FED SHARE$
448
GA. SHARE$
0TH SHARE$
448
COBB 7D7045
PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
896
FED SHARE$ 448
GA. SHARE$
0TH SHARE$ 448
,, ,,
'-
... ,,
.,, J
<..,
~
l!!!!I!!! ..,l.l!!!!!!!!!
~
~
~
~
~
~
-= ~ ~'
.. ~ BEi:lt~ ~;,:;,~ t(.ef::: ~:M
"'-
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 77
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
-----------------------------------------
----------------------------------CO-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
COBB
MULTIMODE, SHORT RANGE, FINANCIAL, FACILITIES, ETC. PLANNING
7D7504 SPECIAL STUDIES/ PLANNING
CONG DIST. 6
FUNDS RECIPIENT: COBB COUNTY MANAGER: STEVE KISH
FUND SOURCE: STATE FUNDS
PLANNING 1994
$ 576
FED SHARE$
461
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
57
0TH SHARE$
58
COBB 7V1013
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH
CONG DIST. 7 & 6
CAPITAL 1994
$
65
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
52
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
7
0TH SHARE$
7
COBB 7Vl014
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH
CONG DIST. 7 & 6
CAPITAL 1995
$
67
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
54
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
6
0TH SHARE$
7
COBB 7Vl015
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH
CONG DIST. 7 & 6
CAPITAL 1996
$
70
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
56
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
7
0TH SHARE$
7
COBB 62120X
SR 92 FM E OF SR 754 TO OLD MOUNTAIN PARK RD/CHEROKEE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.95 MANAGER: RAY METTS,
ATLANTA TIP f CH 20 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 621200 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY.
ROW 1995
$
0 ..
CONST 1996 $
0
FED SHARE $
GA. SHARE $
0TH SHARE $
COBB. 712750
WINDY HILL RELIEVER BRIDGE OVER I-75 (PHASE I) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.40 MANAGER: G. ROSS (C)
ATLANTA TIP f C0171 CONG DIST. 6
FUND SOURCE: SURFACE TRAN SP.ORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
5500 4400 1100
COBB 712752
WINDY HILL RELIEVER FM COBB PKWY TO THE I-75 BRIDGE; PHASE 2 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .70 MANAGER: G. ROSS (C)
ATLANTA TIP f CO 171
CONG DIST. 6
.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW 1996 CONST
$ 1200 AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 78
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
C-O-B-B------E-A-S-T---W-E-S-T--C-O-N-N---IN-T-C-H---W-/-I--2--8-5--E
RAMPS
&-A--T-LA--N-TA-RD-
COMMENTS
YEAR
ESTS
BRID--G-E-,PH2------A-T-L-A-N-T-A---T-IP---t-c-o---R---7-0-------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
712760 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED.
CONG. DIST. 6.
ROW
AFTER 96
PROJECT MILEAGE : .00
CONST
AFTER 96
MANAGER: G. ROSS (CM)
FUND SOURCE: NAT'L HIGHWAY
FEDERAL. HIGHWAY ADMIN FUNDS
COBB 712800
KENNEDY INTERCHANGE@ I-75 (CONTRACT l);SEE 71Y800 FOR IM INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (C)
COBB 712804
KENNEDY INTERCHANGE I-75 IMPRV & AKERS MILL RELOC (CT 2)& NH
INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .OO - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (CM)
COBB 712890
I-75/SR 401 FM I-285 NORTH TO SR 5 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 8.38 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E. LAWS
COBB 71297Y
HOV LN SGN ON I-75 & I-85 METRO/CLAYTON;FULTON;GWINNETT
HOV LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
COBB 713020
I-20 FM W OF SIX FLAGS DR TOW OF SR 280 / & FULTON SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
r..
COBB 713060
I-285: SHOULDER REPAIR ADJ TO CONCRETE PAVING&FULTON-DEKALB
SHOULDER WORK/ MAINTENANCE PROJECT MILEAGE : 42.56 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: .
ATLANTA TIP f CO-R 78
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 71Y800 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CO-R 78
CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 138 CONG DIST. 6 .
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 73 CONG DIST. 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712970 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f AT-R 154 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71302X IS AN ASSOCIATED PROJECT.
ATLANTA TIP f R 130 CONG DIST. 5 & 4
FUNb SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
17007 13606
471 3872
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA, SHARE$ 0TH SHARE$
39855 35870
3986
PE NONE $ ROW.NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0 3687 2950
737
PE 1994 $
0
ROW NONE $.
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994
$
950
FED SHARE$
950
GA. SHARE $
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1994
$
580
FED SHARE$ 522
GA. SHARE$
58
0TH SHARE$
'.1
I !1
)
.....
,,
,, J
t:""'f
~
~
~ . ~ ,,
~
~
~=--=
~
ftifj
t:.~~ ~
r:tr::t:a
~U!~
!!if4K+.1!i
fi,i~~li!i
/i.::: '4ii"
.)~ l,~~-~~ '
~ . -......,,....... .
''
_.
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 79
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
C-O-B-B-------I--2-8-5--W--E-S-T-S-ID-E---52---S-IG-N--S--N-B--FR-O-M--
I-2-0---TO---I--7-5--.-.-. -FU-L-T-O-N--------------A-T-LA--N-T-AC-O-MT-MI-PE-N-IT-SR---1-3-0---------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--
0
71309X UNKNOWN/ UNKNOWN
CONG DIST. 6'
ROW NONE $
0
PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L, SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
713095 IS AN ASSOCIATED PROJECT.
0TH SHARE$
COBB
I-75 VAR LOCA FROM I-285 SOUTH TO BARRETT PKWY .. CLAY-FULTON
ATLANTA TIP IR 130
PE NONE $
0
71311Z PVMNT MARKINGS/ MAINTENANCE
CQNG DIST. 5
ROW NONE $
0
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
713110 IS AN ASSOCIATED PROJECT.
0TH SHARE$
COBB
0
COMMUNICATION CABLE ON I-85 FM I-75 NORTH TO I-285
ATLANTA TIP IR 168
PE NONE $
0
71314X MISCELLANEOUS IMPROVEMENTS/ TRAFFIC
CONG DIST. 4 & 5
ROW NONE $
0
PROJECT MILEAGE : 10.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: BURT RIDDLE
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
COBB 71Y800
KENNEDY INTERCHANGE@ I-75 -TO SHOW IM FUNDS; SEE 712800 INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (C)
ATLANTA TIP I CO-R 78 CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712800 IS AN ASSOCIATED PROJECT.
PE LOCL ROW 1994 $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
3500 4866 4379
487
COBB 71Y804
KENNEDY INTERCHANGE@ I-75 - TO SHOW NH FUNDS; SEE 712804 INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10
MANAGER:
ATLANTA TIP I CO-R 78 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$
0TH SHARE$
4000 3200
800
COBB 720125
N'SIDE. PKWY@ CHATTAHOOCHEE RVR INCL APPR/& FULTON CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 6 LANES. PROJECT MILEAGE : 1.01 MANAGER: BEN BUCHAN (M)
(_
COBB 720468
SR 6/US 278@ CSX .RR 2.8 MI W/POWDER SPRINGS
BRIDGES/ REPLACEMENT PROJECT MILEAGE : .35 MANAGER: D. GODWIN
ATLANTA TIP I AT12/C024 CONG DIST, 5 & 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72Yl25 IS AN ASSOCIATED PROJECT.
ATLANTA TIP I CO 225
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72Y468 IS AN ASSOCIATED PROJECT.
PE 1981 UNDERWAY ROW 1985 UNDERWAY CONST 1996 $ 2500
FED SHARE$ 2000 GA. SHARE$ 500 0TH SHARE$
PE 1993 UNDERWAY
ROW 1994 $
25
CONST 1995 $ 885
FED SHARE$ 708
GA. SHARE$ 177
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 80
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
---------------------------------------
--------------- --------------------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
SR 8/US 78 FROM DOUGLAS CO TO SR 5/INCL BR@ SWEETWATER CK
ATLANTA TIP f CO 7
PE 1986
UNDERWAY
721100 RECONSTRUCTION & WIDENING FROM 2 LANES T9 5 LANES.
CONG DIST. 7
ROW 1991 UNDERWAY
PROJECT MILEAGE : 1.60
CONST 1994
$ 4023
MANAGER: D. SMITH
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 3218
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
805
0TH SHARE $
COBB 721110
SR 8 FM W OF SR 139 TO RIVERVIEW RD (INCL SIGNALS"@ 4 INTER) RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 4.40 MANAGER: D. SMITH
ATLANTA TIP f CO 6
CONG DIST. 7
.
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 UNDERWAY
ROW 1989 UNDERWAY
CONST 1994
$ 8851
FED SHARE $ 7081
GA. SHARE $ 1770
0TH SHARE $
COBB 721150
SR 3/US 41/COBB PKWY FM AKERS MILL RD TO SPRING ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. PROJECT MILEAGE : .54 MANAGER: G. ROSS (C)
ATLANTA TIP f CO 80 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERALHIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1994
$ 2070
CONST 1996
$ 2130
FED SHARE $ 1704
GA. SHARE $
326
0TH SHARE $
100
COBB 721152
SR 3/US 41/COBB PKWY FM PACES MILL RD TO AKERS MILL ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. PROJECT MILEAGE: .99 MANAGER: G. ROSS (M)
ATLANTA TIP I CO 231
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AFTER 96 AFTER 96
COBB 721250
SR 3/US 41/COBB PKWY FM SPRING RD N TO TERRELL MILL PHl,3 RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE: 1.69 MANAGER: G. ROSS (H)
ATLANTA TIP f CO 81
CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 1311 AFTER 96
COBB 721252
COBB PARKWAY FM S 120 LOOP TON 120 LOOP (PHASE 2) RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE : .69 MANAGER: G. ROSS (M)
ATLANTA TIP f CO 81 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96.
COBB 721256
COBB PARKWAY FM TERRELL MILL RD TO SOUTH 120 LOOP (PH 4,5) RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE : 3.01 MANAGER:G. ROSS (M)
ATLANTA TIP f CO 81 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
,, f "
.,,
,..
l'
~
~
I!!!!!!,
~
~
~
~
~
~
. C~L:i_!i
li:!z:.n;$
~i:f~-'t
ft:.:~;:.--;~:
1:'..
:"''.,.;. :.....
~A,
.
\-~--,.:-<;-.,,
-.-:,.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 81
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COBB
SR 120/ROSWELL RD FM SR 120 LP TO PIEDMONT RD/MARIETTA
ATLANTA TIP f CO 177
PE 1996
$
80
721310 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
CONG DIST. 6
ROW
AFTER 96
PROJECT MILEAGE : 1.50
CONST
AFTER 96
MANAGER: D. SMITH (M)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
COBB 721670
S.MARS HILL EXT FM OLD US 278/SR6 BUS TO SR 120/DALLAS HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.44 MANAGER: D. SMITH (CM)
ATLANTA TIP f CO 123
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW 1996 CONST
$ 8000 AFTER 96
COBB 721680
SR 176/MARS HILL RD FRM SR 120/DALLAS HWY TO STILESBORO RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 4.35 MANAGER: D. SMITH (CM)
ATLANTA TIP f CO 24 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 6685 AFTER 96
COBB 721685
MARS HILL RD FM STILESBORO RD TO SR 3/COBB PARKWAY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.13 MANAGER: D. SMITH (CM)
ATLANTA TIP f CO 124 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 4880 AFTER 96
COBB 721690
N.MARS HILL EXT FM SR 3/COBB PKWY TO I-75/BARTOW COUNTY
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.15 MANAGER: D. SMITH (CM)
ATLANTA rIP f CO 122
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY. ~.... ';,
AFTER 96 AFTER. 96
COBB 72Y125
"STP" FUNDING FOR 720125. NOT A REAL PROJECT. BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 1.00 MANAGER: BEN BUCHAN
COBB 72Y468
SHOWN FOR "BR" FUNDS ONLY .... SEE 720468 FOR PROJECT INFO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,00 MANAGER: UNKNOWN
ATLANTA TIP f AT12/C024 CONG DIST. 6 & 5 .
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 720125 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CO 225
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 720468 IS AN ASSOCIATED PROJECT.
PE 1993
UNDERWAY
ROW 1985 UNDERWAY
CONST 1996
$ 1000
FED SHARE $
800
GA. SHARE $
200
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
500
FED SHARE$
400
GA. SHARE$
100
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATIO~
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 82
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O-B-B------S-R---36-0-/M--A-C-L-A-N-D--R-D--F-M---SR---1-7-6--TO---PO-W--D-E-R--S-P-R-IN-G--S--R-D------------------A-T-L-A-N-T-A--T-I-P--f--C-O--3-9---------------------P-E--1-9-8-6-----U-N-D-ER-W--AY
730860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 6 & 7
ROW LOCL
PROJECT MILEAGE : 4.00
CONST 1994
$ 9477
MANAGER: G. 'ROSS
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 7582
FEDERAL-HIGHWAY ADMIN FUNDS
GA. SHARE$ 1895
0TH SHARE$
COBB 731020
SR 120 LOOP/N. MARIETTA. PARKWAY AT COLE STREET TURN LANES/ TRAFFIC PROJECT MILEAGE : .17 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: D. GODWIN
ATLANTA TIP f co234 CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW LOCL
<:;ONST 1994
$
94
FED SHARE$
85
GA. SHARE$
9
0TH SHARE$
COBB 751430
FRNTG RD 1-WY PAIR FM ROTTENWOOD CK TO NORTHSIDE DR/FULTON RECONSTRUCTION & -WIDENING. NO LANE ADDITION PROPOSED.'.
PROJECT MILEAGE : 1.70 MANAGER: D. SMITH (M)
ATLANTA TIP f CO-R 67 _CONG DIST. 6 & 5
FUND SOURCE_: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
COBB 751670
CR 2845/BELLS FERRY RD FM I-575 N TO CHEROKEE CL/INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: H. ASHMORE
COBB 751675
SHILOH RD REALIGNMENT WITH SHALLOWFORD RD@ BELLS FERRY RD INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE: .43 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: H. ASHMORE (C)
COBB 751890
SR 176@ SR 6 BUS & MACEDONIA RD INCLU UPGRADE SIGNALS
INTERSECTION IMPROVEMENT/ TRAFFIC
.
PROJECT MILEAGE : .38 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GODWIN
COBB 752220
SR 6BU/ELLIOTT RD OVER POWDER SPRINGS CRK W OF POWDER SPS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED-LANES. PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP f CO 71 CONG DIST. 6 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CO 136 CONG DIST. 6 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA. TIP f CO 227 CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I CO 247
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW LOCL
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
3631 2905
726
PE NONE $
0
ROW LOCL
!,'.!ONST 1994
$
357
FED SHARE$ 286
GA. SHARE$
71
0TH SHARE$
PE NONE $
0
ROW 1993 UNDERWAY
CONST 1994
$
403
FED SHARE$
363
GA. SHARE$
40
0TH SHARE$
PE 1995 ROW CONST
$
16
AFTER 96
AFTER 96
:,
<i
!
It '
., ...
~
~
~
~
.
'It
~
~
M~
~
~
~ ~Lli!'II
,:.
~~
t:;:.";~;,;~
~fo-'~
~;,;;,j
~-, l'.1." ~_-!i
r: ::
. ~...
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 83
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O-B-B-------SR---6-B-U-S--R-E-A-L-I-G-N-M-E-N-T---W-IT-H---B-R-O-W-N-S-V-I-L-L-E--R-O-A-D------------------------A-T-L-A-N-T-A--T-I-P--f--C-O--2-4-8--------------------P-E--1-9-9-4-----U-N-D-ER-W--AY
752260 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 7
ROW LOCL
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST 1995 $ 210
MANAGER: D. GODWIN
FUND SOURCE: HWY. SAFETY
FED SHARE$ 189
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
21
0TH SHARE$
COBB 752310
OLD CANTON RD OVER SHEFFER CK TRIBUTARY/SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP t CO 246
CONG DIST. 6
.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
12
ROW LOCL
CONST 1996 $ 802
FED SHARE$
642
GA. SHARE$ 160
0TH SHARE$
COBB 770262
CR 133/HOLT ROAD AT SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP t CO 242
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994 $ 465
FED SHARE$
372
GA. SHARE$
93
0TH SHARE$
I
COBB 770263
CR 257/KURTZ ROAD OVER NOONDAY CREEK
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: ,00
MANAGER:
r..
ATLANTA TIP t CO 244
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994 $ 455
FED SHARE$ 364
GA. SHARE$
91
0TH SHARE$
COBB . 770264
CR 822/BURNT HICKORY ROAD OVER ALLATOONA CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: ,00 MANAGER:
ATLANTA TIP t CO 243
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994 $ 522
FED SHARE$ 418
GA. SHARE$
104
0TH SHARE$
COBB 770291
CR 2793/QUEENS MILL ROAD OVER NICKAJACK CREEK REPLACEMENT OF THE EXISTING BRIDGES($). FROM 2 TO 3 LANES.
PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP t CO 241
CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
700
FED SHARE$ 560
GA. SHARE$ 140
0TH SHARE$
COBB 770350
OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:
ATLANTA TIP t CO 239
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
5
AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPT.ION
P. I.NO.
PROJECT DATA
COBB
HIRAM RD/CR 2081 OVER POWDER SPRINGS CREEK
COMMENTS
ATLANTA
TIP
f
----------
CO 245
770360 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 7
PROJECT MILEAGE: .00
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY AD~IN FUNDS
16-Sep-1993 Page 84
FISCAL
COST
YEAR
ESTS
----- .---------------------
PE 1995
$
5
ROW LOCL
CONST
AFTER 96
COBB 770370
FRIENDSHIP CHURCH RD/CR 942 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER:
ATLANTA TIP f CO 240
'CONG DIST. 6
.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
5
AFTER 96
COBB 770470
HISTORIC DEPOT RENOVATION IN KENNESAW ANO WALKWAYS MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
COBB 770601
TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN COBB COUNTY
SIGNALS/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
COBB 770635
6 COBB COMMUNITY TRANSIT BUSES EQUIP. PURCHASE / CAPITAL PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
1.
COBB
DECK OVERLAYS FOR SIX BRIDGES IN DISTRICTS 7 & 3
811040 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00
MANAGER: UNKNOWN
COBB 810040
DECK OVERLAYS FOR SIX BRIDGES IN DIST 7,3; TO SHOW STP FUNDS
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: UNKNOWN
ATLANTA TIP f CO 237
CONG DIST. 6 FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t CO 249
CONG DIST. 6 ,- 7 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CO-R 163 CONG DIST. 6 &- 7 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 6 & 7 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS 810040 IS AN ASSOCIATED PROJECT.
cqNG DIST. 6: & 7 FUND SOURCE:- SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 811040 IS AN_ASSOCIATEO PROJECT.
PE LOCL
ROW LOCL
CONST 1996 $ 156
FED SHARE$ 125
GA. SHARE$
0TH SHARE$
31
PE 1994
$
50
ROW NONE
$
0
CONST 1995
$
950
FED.SHARE$ 760
GA. SHARE$
0TH SHARE$
190
PE NONE $ ROW NONE $ CONST 1995 $'
FED SHARE$ GA. SHARE$
0TH SHARE$
0 0 1320 1056
264
PE NONE $
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 1497 1347
150
PE_ NONE $
0
ROW NONE $
0
CONST 1994
$
363
FED SHARE$ 290
GA. SHARE$
73
0TH SHARE$
. . (. ..
,,
,.... ' ~
~
== @.iB ~ , ~ ,, ~
== . : : i
=~ --~
~ -~ ~-a Fii>~
~
~~~
tf~,~~
j,:,-,~)
-~ ,,.::1
l
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 85
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COFFEE SR 135/ US 221/ IN DOUGLAS@ SEVENTEEN MILE RIVER
PE 1986 UNDERWAY
421240 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5 LANES.
CONG DIST. 8
ROW NONE $
0
PROJECT MILEAGE : .20
CONST 1995 $ 1656
MANAGER: J. LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 1325
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
331
421320 IS AN ASSOCIATED PROJECT.
0TH SHARE$
COFFEE 421320
SR 135 FM SR 32/DOUGLAS NE TON DOUGLAS BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 3.10 MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421240 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW LOCL
CONST 1995 $ 2748
FED SHARE$ 2198
GA. SHARE$
550
0TH SHARE$
COFFEE 421340
SR 32/DOUGLAS FM W CL TOE/SR 206 .. INCL 1-WAY PAIR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 3.57 MANAGER: M. REYNOLDS
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 431280 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY ROW 1994 $ 2780 CONST 1995 $ 4402
FED SHARE$ 3522 GA. SHARE$ 880 0TH SHARE$
COFFEE 421345
SR 32 FM W/CR 296 EAST TO WEST CITY LIMITS OF DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.13 MANAGER: M. REYNOLDS(CM)
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY $ 3289 AFTER 96
COFFEE 42134X
SR 32@ 2 LOC/IRWIN & 2 LOC/COFFEE ... SEE IRWIN COUNTY
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LINDSEY
COFFEE 422250
SR 31/US 441@ MILL CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: J. GRAYBEAL
COFFEE 422350
SR 135 AT MCDONALD ROAD IN DOUGLAS
TURN LANES/ TRAFFIC
PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
r..
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421343 IS AN ASSOCIATED PROJECT.
CONG DIST. 8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421910 IS AN ASSOCIATED PROJECT.
ALBANY TIP f H/R-2 CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0.
ROW 1993 UNDERWAY
CONST 1994
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
PE 1994
$
9
ROW 1995 $
10
CONST 1996 $ 289
FED SHARE$ 289
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 86
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O--F-FE-E----S-R---1-3-5-@---IN-T-E-R-S-E-C-T-I-O-N--O--F--CR---5-7-9-; --C-R--1-4-6-; --C-R--1-4-8----------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY
431250 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 2
ROW 1994 $
3
PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1995 $ 383
MANAGER: J. LINDSEY
FUND SOURCE: HWY, SAFETY
FED SHARE$ 345
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
38
0TH SHARE$
COFFEE 431280
LANDSCAPING/ST SCAPE MASTER PLAN DWTOWN DOUGLAS (421340)
LANDSCAPING/ ENHANCEMENT
PROJECT MILEAGE : ; 50 - EXIST. LANES: 0 /PROPOSED LANEiS.: 0
MANAGER: M. REYNOLDS (C)
.
CONG DIST. 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS 4Z1340 IS AN ASSOCIATED PROJECT.
PE LOCL
ROW NONE $
CONST 1994
$
FED SHARE$
GA. SHARE $
0TH SHARE$
0 1520 1216
366 670
COFFEE 442470
SR 31/US 441@ MCNEAL DR/CHESTER AVE
TURN LANES/ TRAFFIC PROJECT MILEAGE : ,14 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LINDSEY
CONG DIST. 8 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1994 $ 146
FED SHARE$ 131
GA. SHARE$
15
0TH SHARE$
COFFEE 442600
SR 158 AT SHIRLEY AVENUE IN DOUGLAS TURN LANES/ TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 8
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
9
ROW 1994 $
10
CONST 1995 $ 289
FED SHARE$ 289
GA. SHARE$
0TH SHARE$
COFFEE 450380
SR 206/PERIMETER RD FM SR 32 TO SR 31 IN DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.72 MANAGER: J. LINDSEY (M)
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$
50
AFTER 96
\
,,
1f",....
,, 'I
D!!!IJ
lffll!!'!!!
. l. l!!M ~ ~
e..M!!
P-i\J
~
=ill
ffil~
~
E@Xff.f,l
.~~~~
H~
~,:-::ii
:~::.~-~
(',:-;<c;;cl
. ~""2i-i~ -.
~~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 87
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-,N--O-.----------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-STS
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE
4B1407 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 8 & 2
FUNDS RECIPIENT: CITY OF MOULTRIE
OPERATING 1994 $
37
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
23
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4Bl408 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH
CONG DIST. 8 & 2
OPERATING 1995 $
38
FUND SOURCE: RURAL TRANSIT
FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4B1409 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH
CONG DIST. 8 & 2
OPERATING 1996 $
40
r_
FUND SOURCE: RURAL TRANSIT
FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
25.
GA. SHARE$
0TH SHARE$
15
COLQUITT SR 37/MOULTRIE FM OKAPILCO CRK TO SR 35 BYP
421840 TURN LANES/ TRAFFIC PROJECT MILEAGE : .60 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J, LINDSEY
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994 $ 675
FED SHARE $
675
GA, SHARE $
0TH SHARE $
COLQUITT SR 133: CSX RR OVER SR 133 0.3 MIN OF SQUARE IN MOULTRIE 422000 BRIDGE REMOVAL/ NEW CONSTRUCTION
PROJECT MILEAGE : 1,00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: J. LINDSEY
PE NONE $
0
CONG DIST. 2
ROW 1994 $
5
CONST 1994 $ 259
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 207
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
52
422005 IS AN ASSOCIATED PROJECT,
0TH SHARE$
COLQUITT SR 37: REMOVE SAG@ OLD CSX RR WEST OF SQUARE IN MOULTRIE 422005 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .75 MANAGER: J. LINDSEY
PE NONE $
0
CONG DIST. 2
ROW NONE $
0
CONST 1994 $ 119
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
95
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
24
422000 IS AN ASSOCIATED PROJECT.
0TH SHARE$
COLQUITT SR 37/W. CENTRAL AVE@ 11TH ST NB&SB IN MOULTRIE & SIGNALS 442490 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .SO - EXIST, LANES: 2 /PROPOSED LANES: 3 MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1994 $
5
CONST 1994
$
125
FED SHARE$ 113
GA. SHARE$
13
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY.1996
16-Sep-1993 Page 88
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
--------------------------------------------------------------------------------------------- .----------------------- -.-----------
COLQUITT CR 477/COOL SPRINGS RO @ INDIAN CK 2 MI NE OF MOULTRIE
PE NONE $
0
442670 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
CONG DIST. 2
ROW LOCL
PROJECT MILEAGE : .19 MANAGER:
..
CONST 1996 $ 104
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
83
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
21
0TH SHARE$
COLQUITT CR 235/JAMES KING RO@ BRIDGE CREEK 470685 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .16 MANAGER: J. LINDSEY
(
CONG [?IST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL-HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994 $ 232
FED "SHARE$ 186
GA. SHARE$
46
0TH SHARE$
,
I
,, ~ .
:-.
.~
. ,
,1
(!'!!!ft
~
~ ~
lfJ ,,..
~
~
-"'-'"'
~l
~ ==
~~
'
!'.fl?Y:Ci
"
~
~.,C6t~
f;~-_.~
~~!-~
..~?4i
(... , .. ~-.:-
I)~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 89
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P .I.NO.
PROJECT DATA
COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE
COMMENTS
YEAR
ESTS
--- --------- ---------------------.----------------------
2Bl098 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 10
FUNDS RECIPIENT: COLUMBIA
OPERATING 1994 $
45
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
27
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
19
COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl099 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1995 $
47
FUND SOURCE: RURAL TRANSIT
FED SHARE$
28
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
19
COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll00 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1996 $
49
FUND SOURCE: RURAL TRANSIT
FED SHARE$
29
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
20
COLUMBIA ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
2C2098 TRANSIT FACILITIES./ CAPITAL FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
. FED SHARE $:
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
COLUMBIA ONE STANDARD VAN AND ONE MOBILE RADIO 2C2099 TRANS.IT FACILITIES / CAP ITAL
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
COLUMBIA I-20@ WHEELER RD/SEE RICHMOND CO 21049X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: NEIL DAVIS
r.
COLUMBIA I-20: REST AREA 162,163; 152, 153 IN MORGAN CO. 21056X REST AREA/ RECST. OR REHAB,
PROJECT MILEAGE : ,00 - EXIST, LANES: 2 /PROPOSED LANES: 4 MANAGER: UNKNOWN
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 210490 IS AN ASSOCIATED PROJECT.
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL.. HIGHWAY ADMIN FUNDS 210560 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
PE NONE $
0
ROW NONE $
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION. STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 90
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O--LU--M-B-IA---SR---2-3-2--W-B--M-P--2-.5---3.-6-;-E-B---3-.6---5-.0;WB -4-.2-5---6-.-9-/-IN--C-L---C-LV-T--------------A-U-G-U-S-T-A--T-IP---f--G-I-0-0-6---------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
221410 ADDITION OF A PASSING LANE.
CONG DIST. 10
ROW 1993 UNDERWAY
PROJECT MILEAGE: 2.40
CONST 1994
$ 2800
MANAGER: D_- GRIFFITH
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 2240
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
560
0TH SHARE $
COLUMBIA SR 10/US 78 FM UCHEE CRI< E/CR 258 TO SR 223/RICHMOND CO 221790 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.10 MANAGER: BILL MOSKAL
AUGUSTA TIP f RC-004 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
67
$
70
AFTER 96
COLUMBIA SR 104 FM MP 11.95 S/CR BO .TO SR 47@ POLLARDS CORNER 221800 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.96 MANAGER: D. GRIFFITH
COLUMBIA SR 104 FM MP B.95 S OF CR 515 TO MP 11.95 S OF CR BO 221805 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.00 MANAGER: UNKNOWN
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
AUGUSTA TIP f CC-076 CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY.ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
PE 1992 ROW 1995 CONST
UNDERWAY $ 1392 AFTER 96
COLUMBIA SR 28/FURYS FERRY RD FM RIVERWATCH PKWY TO CR 98/RICHMOND 221860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.11 MANAGER: D. CHURCH (M)
AUGUSTA TIP f RC-CC-048 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 2164 AFTER 96
COLUMBIA SR 28/FURY'S FERRY RD@ BASTON RD/VAUGHN RD 222230 INTERSECTION IMPROVEMENT/ RECST. OR REHAB.
PROJECT MILEAGE : .43 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: D. CHURCH (C,M)
COLUMBIA SR 47 SB FRM MP 2.45 NEAR KEG CREEK SOUTH TO MP 3.88 231350 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 1.43 ~AGER:
AUGUSTA TIP f CC-048
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW 1993 UNDERWAY.
CONST 1994
$ 2443
FED SHARE $ 1954
GA. SHARE $
489
0TH SHARE $
PE 1995 ROW CONST
$
23
AFTER 96
AFTER 96
,, ,.. ~
'-
.,
I~
~
,. = ~
~
., ~
~ ~
~~
~~~l~
=~,;;J:i
~
r15~i!!l~
~i~,,.~
k~,#,
~~i~f.fu
j'; ..-~:
f .. :...
..~~---,r"~
t).\
GEORGIA DEPARTME;~lT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 91
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO.
PROJECT DATA
----- -------------
----------
----------------------------------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
COLUMBIA SR 104/WASHINGTON RD@ CLUB CAR DRIVE (COMMERCIAL DRIVE)
AUGUSTA TIP f CC-076
PE 1994 UNDERWAY
231370 INTERSECTION IMPROVEMENT/ TRAFFIC
.
CONG DIST. 10
ROW LOCL
PROJECT MILEAGE : ,90 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D. GRIFFITH
FUND SOURCE: HWY. SAFETY
CONST 1995
$
670
FED SHARE$
603
FEDERAL'HIGHWAY ADMIN FUNDS
GA. SHARE$
67
0TH SHARE$
COLUMBIA SR 383/BELAIR RD FM FT GORDON GATE TO I-20/SEE RICHMOND CO 25032X RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : ,33 MANAGER: D, CHURCH
AUGUSTA TIP f RC-CC-207 CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 250320 IS AN ASSOCIATED PROJECT.
PE NONE $
0
ROW 1993 UNDERWAY
CONST 1994
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
COLUMBIA CR 145 FM CR 209 TO BASTON; NEW LOC FM OWENS TO OLD EVANS 250470 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.82 MANAGER: D. CHURCH (M)
AUGUSTA TIP f CC-7063 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
COLUMBIA CR 145 FM BASTON TO RIVERWATCH PK;BASTON FM SR 104 TO CR 145 250475 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : ,40 MANAGER: D. CHURCH
AUGUSTA TIP f CC-7063 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBIA SR 104 FM CR 91/SCOTTS WAY NW TOE/CR 515 (INCL BRIDGES) 262080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.21 MANAGER: UNKNOWN
AUGUSTA TIP f CC-076 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COLUMBIA CR 136/BASTON RD FM CR 145 N TO SR 28/MARTINEZ 262410 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .72 MANAGER: D. CHURCH
COLUMBIA DAVIS RD EXT FM WASHINGTON RD TO MARTINEZ BLVD 262490 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : .06 MANAGER: D. GRIFFITH
AUGUSTA TIP f CC-7006 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
. AUGUSTA TIP f CC-7006 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
U~DERWAY
.-
ROW LOCL
CONST 1995 $ 3073
FED SHARE$ 2458
GA. SHARE $:> 615
0TH SHARE$
PE 1992 UNDERWAY ROW 1995 $ 1995 CONST 1996 $ 3502
FED SHARE $ 2802 GA. SHARE $ 700 0TH SHARE $
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$
505
FED SHARE$
404
GA. SHARE$
101
0TH SHARE$
PE 1995 ROW LOCL CONST
$
12
AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 92
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COLUMBIA KATHERINE STREET AT CSX RAILROAD . t279476X
PE NONE
$
0
270920 RR XING / TRAFFIC
CONG DIST. 10
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
90
MANAGER: W HESTER
FUND SOURCE: HWY. SAFETY
FED SHARE$
81
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
9
0TH SHARE$
,, ...
'
...
t
l -~
rn!!l'!!ffl
l!!ffl l!ffl!!I ~
1,1
J
1e
~
~
M1ffilti1
~~
~
,, IlQ.:,aa..-=;:;c:JI
~ ...
~~ttt~
j:0'.:.:::~~
....~ /:":-::~~::~ p,w1
I
"'--'
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 93
PROJECT LISTING.BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O-O-K-------I --7-5-@ ---S-R--3-7-/-A-D-E-L---[F-M---1-5-0-0--F-T--W-E-S-T--TO---6-5-0--F-T--E-A-S-T--I-- 7--5-) --------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
410420 INTERCHANGE/ RECST. OR REHAB.
CONG DIST. 8
ROW 1995
$
100
PROJECT MILEAGE : .40 - EXIST. LANES: 2 /PROPOSED LANES: 5
CONST 1996 $ 3071
MANAGER: RON BRAZIEL
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 2764
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
307
0TH SHARE $
COOK 410510
I-75 FM LOWNDES CO LINE TO SR 37 RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.
PROJECT MILEAGE : 7.75 MANAGER: H. ASHMORE(M)
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
COOK 410520
I-75 FM SR 37 TO CR 246 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 9.30 MANAGER: H. ASHMORE(M)
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
COOK 410530
I-75 FM CR 246/COOK TO CR 204 IN TIFT COUNTY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 10.23 MANAGER: H. ASHMORE(M)
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AF-TER 96
COOK 410600
I-75 IMPROVE SANITATION, PARKING & LIGHTS@ REST AREAS 16&7 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER:
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
ROW 1994
$
CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE $.
500 2
1783 1605
178
'
COOK
SR 37/ADEL FM 600' E/I-75 'EAST TO PARRISH ST
421780 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .99
MANAGER: RON BRAZIEL
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1992
UNDERWAY
ROW 1995
$ 3110
CONST 1996 $ 1702
FED SHARE$ 1362
GA. SHARE$
340
0TH SHARE$
r_-
COOK 431430
SR 7 AT NORFOLK SOUTHERN RAILROAO .. f723363R
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: ff.HESTER
CONG DIST:. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST 1994
$
79
FED SHARE$
71
GA. SHARE$
8
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FYl994/FY 1996
16-Sep-1993 Page 94
COUNTY
DESCRIPTION
P.I.NO.
PROJECT DATA
----------- ---- -- COOK
- CR 59 AT NORFOLK SOUTHERN RAILROAD .. f723177P
.
470980 RR XING / TRAFFIC
PROJECT MILEAGE,: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER
,
.
FISCAL
COST
--- -------CO-MME-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PE NONE $
0
CONG DIST. 8
ROW NONE
$
0
CONST 1994
$
90
FUND SOURCE: HWY. SAFETr
FED SHARE$
81
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
9
0TH SHARE$
/
(.
. ~
. ,
1
' ~
. ~
''
~
~
~ ~
.,
J
!.,
~
~j
lt!'.;;~ff ~
~
Eri'iff,~ "
~~ .,
~~
t(&.:':~~
1.. .-:---S:
I.>;-;;~;,;"
t-;~.,,4Y::~
i-11
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 95
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P,I.NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O-W--E-TA----I---8-5--F-R-O-M--M--P --33--T-O--M--P --4-1 --IN-C--L--R-E-P-L--O-F--G-U-A-R-D-R-A-I-L----------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY
311600 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 3
ROW NONE $
0
PROJECT MILEAGE : 8,00 - EXIST. LANES: 4 /PROPOSED LANES: 4
CONST 1994 $ 4821
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$ 4339
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
482
0TH SHARE$
COWETA 31171W
CALL BOXES ON I-85 FM ALABAMA TO SR 74/FULTON ... SEE HARRIS UNKNOWN/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 7 & 3
FUND SOURCE: I-STATE MAINT... FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
COWETA 321310
SR 16, US 27 ALT FM EVANS RD/CR 677 N TO NEWNAN BYPASS
RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. {.
PROJECT MILEAGE : 1.33
MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
683
FED SHARE$ 546
GA. SHARE$
137
0TH SHARE$
COWETA 321450
SR 14/ US 29A/ GREENVILLE ST@ A&WP RR BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : ,34 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1986 UNDERWAY ROW 1994 $. 309 CONST 1995 $, 1215
FED SHARE $'. 972 GA. SHARE$ 243 0TH SHARE$
COWETA 321850
SR 34_ FM NEAR WHITE OAK CRK E TOE/SR 154 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.80 MANAGER: J. GRAYBEAL
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1994
CONST
UNDERWAY $ 144'1 AFTER 96
COWETA 322060
SR 54/34 FM FISCHER XRDS TO SR54 . TO SR 74 .. FAYETTE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.79 MANAGER: M. REYNOLDS (M)
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY
AFTER 96 AFTER 96
COWETA 322063
SR 54@ LINE CREEK/ALSO FAYETTE CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .01 MANAGER: M. REYNOLDS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 96
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
--- --- ---- P. I.NO.
PROJECT DATA
COWETA SR 34 E/NEWNAN FM SR 154 TO SR 54@ FAYETTE CO LINE
322340 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.11
MANAGER: M. REYNOLDS (M)
FISCAL
COST
-----------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PE 1992 UNDERWAY
CONG DIST. 3
ROW
AFTER 96
CONST
AFTER 96
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
COWETA 322345
SR 34@ SHOAL CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS (M)
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
COWETA . 322390
SR 34/NEWNAN FM SR 34 BYP TO I-85 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .71 MANAGER: M. REYNOLDS
COWETA 322400
SR 34 BYP/NEWNAN FROM SR 70/INCLUDE CSX RR BRIDGE TO SR 34
RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES. r-
PROJECT MILEAGE : 3.09
.
MANAGER: M, REYNOLDS (C)
CONG DIST: 3 FUND soyRcE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST .. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1994 $ 500 CONST 1995 $ 1264
FED SHARE $ 1011 GA. SHARE $. 253
0TH SHARE $
PE 1992 ROW 1995 CONST
UNDERWAY $ 2249 AFTER ,96
COWETA 331730
CR 555 OVER MESSIERS CREEK NORTH OF JCT SR 14 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)
COWETA 331920
CR 547/GORDON RD@ LITTLE WHITE OAK CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .57 MANAGER: GORDON BROWN
COWETA 332090
SR 74/85 AT KEG CREEK EAST OF SENOIA ADDITION OF A PASSING LANE. . PROJECT MILEAGE : .30 MANAGER:
CONG DIST, 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 33Y090 IS AN ASSOCIATED PROJECT.
PE LOCL
ROW LOCL
CQ_NST 1996 $ 137
. FED SHARE $ 110
GA. SHARE$
27
0TH SHARE$
PE 1992 UNDERWAY
ROW LOCL
CONST 1994 $ 341
FED SRARE $ 273
GA. SHARE$
68
0TH SHARE$
PE 1994 ROW 1996 CONST
$
10
$
5
AFTER 96
. '
. ..
~ ,,
-~
~
. ~
.,
~
,
~ ~-
lt'IK~
tfLJ.~W!,
~
~:~ # .,
~= r,,;:zyc'<'.;,
~~ti~
~';~i
r,::;::;:~
rt"'--'.':~:_-i
f""." ... -,~<:
., .
'1
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 97
PROJECT LISTING BY COUNTY FY 1994/FY 1996
I COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
C-O-W--E-TA----S-R--1-4-/-U-S--2-9--A-T--S-R---15-4-------------------------------------------------------------------------------------P-E--N-O-N-E-----$------0
332170 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 3
ROW 1996 $
58
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST
AFTER 96
MANAGER: GORDON BROWN (M)
.
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
COWETA 332180
SR 16 AT SR 54 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST .. LANES: 2 /PROPOSED LANES: 4 MANAGER: GORDON BROWN(M)
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE ROW 1996 CONST
$
0
$
21
AFTER 96
COWETA 33Y090
SR 74 / 85@ KEG CREEK EAST OF SENOIA/ FOR 118 FUNDS UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
COWETA 342830
CR 252/SMOKEY ROAD OVER MOUNTAIN CREEK OVERFLOW REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER:
COWETA 350640
SR 70.N/NEWNAN@ WAHOO CRK & LITTLE WAHOO CR~ REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .38 MANAGER: GORDON BROWN
COWETA 350980
SR 34 AT FIVE EXISTING MEDIAN OPENINGS TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: GORDON BROWN(M)
l
COWETA 370781
CR 157/ROCKAWAY RD IN SENOIA@ CSX RR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .30 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 332090 IS AN ASSOCIATED PROJECT.
PE 1994 ROW 1996 CONST
$
0
$
0
AFTER 96
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS.
PE LOCL
ROW LOCL
CONST 1996 $ 102
FED SHARE$
82
GA. SHARE$
20
0TH SHARE$
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1990 UNDERWAY
ROW 1992 UNDERWAY
CONST 1994
$ 1046
FED SHARE $ 837
GA; SHARE $ 209
0TH SHARE $
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
18
$
1
AFTER 96
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL.HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995 $ 374
FED SHARE$ 299
GA. SHARE$
75
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 98
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. LNO.
PROJECT DATA
C-O-W--E-TA----C-R---1-34-/-T-O-P-E--R-O-A-D--O--V-E-R--P-IN--E--C-REEK
-------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S-PE LOCL
370820 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 3
ROW LOCL
PROJECT MILEAGE : .25
CONST 1994
$
137
MANAGER: GORDON BROWN(C)
F.UND SOURCE: BRIDGE PROGRAM
FED SHARE$ 110
FEDERAL HIGHWAY ADMIN FUNDS
GA .. SHARE $
27
0TH SHARE$
COWETA 370825
CR 252/SMOKEY RD OVER MOUNTAIN CK NE OF CORINTH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994 $ 266
FED SHARE$ 213
GA. SHARE$
53
0TH SHARE$
COWETA 370828
CR 76 OVER LITTLE WHITE OAK CREEK SOUTH OF TURIN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)
CONG DIST. 3
FUND SOURCE:_BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
. 231
185 46
COWETA 370831
CR 160 OVER DEAD OAK CREEK SE OF SENOIA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .25 MANAGER: GORDON BROWN(C).
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
226
FED SHARE$ 181
GA. SHARE$
45
0TH SHARE$
COWETA 370834
CR 122/TURKEY CK RD OVER TURKEY CREEK EAST OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LO.CL CONST 1994 $
FED SHARE$ GA. SHARE$
0TH SHARE$
. 185 148 31
COWETA 370910
CR 157@ LINE CRK & LINE CRK OFLW . . ALSO FAYETTE CO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : 53 .
MANAGER: GORDON BROWN
CONG DIST. 3
FUND-SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 37091X IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 964 FED SHARE$ 771
GA. SHARE$ 193 0TH SHARE$
COWETA 370970
CR 336/WITCHER ROAD OVER WAHOO CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .25
MANA9ER:
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
352
FED SHARE$ 282
GA. SHARE$
70
0TH SHARE$
J
.~
.
,,
~
~
~ ~1~,
I)
,.,.
~~
~Jffil
==:r;:w
t~f~;:!~
~~
.. .. ,~~;~
~
Jittlij~
~\\".
r.f!f'~~;1,
1; ~-:: ~~ffi
..f;r.,.,,-)
~ ..
~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 99
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P-,-I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
COWETA CR 261/CORNITH ROAD OVER SANDY CREEK TRIBUTARY
PE LOCL
370980 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES,
CONG DIST. 3
ROW LOCL
PROJECT MILEAGE : ,25
CONST 1994
$
197
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
158
FEDERAL HIGHWAY ADMIN FUNDS
GA, SHARE$
39
0TH SHARE$
COWETA 370990
CR 33/MAJOR ROAD OVER LITTLE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER:
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
115
FED SHARE$
92
GA. SHARE$
23
0TH SHARE$
COWETA 371000
CR 139/NEEDY ROAD OVER PINE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .25 MANAGER:
CONG DIST, 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
144
FED SHARE$ n5
GA. SHARE$
29
0TH SHARE$
(_
COUNTY P. I.No.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1208 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD MANAGER: STEVE KISH
( CONG DIST. 3 & 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOHIN FUNDS
16-Sep-.1993 Page 100
FISCAL YEAR
COST ESTS
OPERATING 1994 $
54
FED SHARE$
30
GA. SHARE $
0TH SHARE$
24
CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1209 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD
MANAGER: STEVE KISH
CONG DIST. 3 & 2
FUND SOURCE: RURAL TRANSIT
OPERATING 1995 $
63
FED SHARE$
35
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$
0TH SHARE$
28
CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1210 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD
MANAGER: STEVE KISH
CONG DIST. 3 & 2
OPERATING 1996 $
65
FUND SOURCE: RURAL TRANSIT
FED SHARE$
36
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$
0TH SHARE$
29
CRAWFORD ONE STANDARD VAN ANO ONE MOBILE RADIO 3C2208 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CRAWFORD MANAGER: STEVE KISH
CONG DIST. 3 & 2
CAPITAL 1994
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
CRAWFORD SR 96/FALL LINE FWY@ FLINT RIVER TRIS 320955 REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .20 MANAGER: J. GRAYBEAL
CONG DIST. 3 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 363130 IS AN ASSOCIATED PROJECT.
PE 1991 UNDERWAY.
ROW NONE $
0
CONST 1996' $ 191
FED SHARE $ 153
GA. SHARE $
38
0TH SHARE $
CRAWFORD SR 42@ CULPEPPER CREEK W OF SR 7 331600 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
1.
CONST 1995 $ 366
FED SHARE $ 293
GA. SHARE $
73
0TH SHARE $
~
'
.'
~
~
., ~ '
~ ,..,,
~
~
-fill,~
~~;~ - ~
-,,,.._,,,,,,.., ~.,
)~
~ir;.::i.lil
j>>l:Mij
t~-.-:--c:,r:~
.~..;.-.:.~:..( ~
,, ;.t
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
CRISP 41025X
I-75 FM SR 159 NEAR ASHBURN TO SR 300@ CORDELE .. SEE TURNER RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .OO MANAGER: H. ASHMORE
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410250 IS AN ASSOCIATED PROJECT.
16-Sep-1993 Page 101
FISCAL YEAR
COST ESTS
PE 1987 ROW 1996 CONST
UNDERWAY
$
0
AFTER 96
CRISP 410260
I-75 FM 1 MILES OF CR 117 TO DOOLY CO LINE RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 7.13 MANAGER: H. ASHMORE
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY_ FEDERAL HIGHWAY ADMIN FUNDS 410265 IS AN ASSOCIATED PROJECT.
PE 1986 UNDERWAY
ROW NONE $
0
CONST 1995 $ 10879
FED SHARE$ 8703
GA. SHARE$ 2176
0TH SHARE$
CRISP SR 30/US 280 MP EB 14.35-15.35; WB 17.0-18.5
PE 1992
UNDERWAY
420605 ADDITION OF A PASSING LANE.
CONG DIST. 8
ROW 1994
$
8
PROJECT MILEAGE : 2.50
(.
CONST 1995 $ 1006
MANAGER: J. LINDSEY
FUND SOURCE: NAT'L HIGHWAY
FED SHARE-$
805
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 201
0TH SHARE$
CRISP 422190
SR 257 NEAR CORDELE@ MIDWAY RD/CR 266 & CR 353 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY (M)
CONG DIST. 8
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
5
ROW 1995 $
3
CONST 1996 $ 547
FED SHARE$
547
GA. SHARE$
0TH SHARE$
CRISP 470841
CR 241@ GUM CREEK/LAKE BLACKSHEAR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994 $ 310
FED SHARE$
248
GA. SHARE$
62
0TH SHARE$
CRISP 471000
REHAB & RESTORE THE HISTORIC DISTRICT OF CORDELE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST; 8 & 2
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 $
6
ROW NONE $
0
CONST 1996 $
92
FED SHARE$
74
GA. SHARE$
1
0TH SHARE$
19
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 102
COUNTY
DESCRIPTION
FISCAL
COST
----- P. I.NO.
PROJECT DATA
DADE ---C-O-U--N-TY O-PE-R-A-TED PUBLIC---T-R-A-NSIT SERVICE
--------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
6B1343 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: DADE MANAGER: STEVE KISH
OPERATINGl994
$
23
FUND SOURCE: RURAL TRANSIT
FED SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
9
DADE 6Bl344
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE KISH
CONG DiST. 9
OPERATING 1995
$
23
FUND SOURCE: RURAL TRANSIT
FED SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
0 GA. SHARE$
0TH SHARE$
9
DADE 6Bl345
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE-KISH
CONG DIST: 9
OPERATING 1996 $
25
FUND SOURCE: RURAL TRANSIT
FED SHARE$
15
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
10
DADE 6C2343
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DADE MANAGER: STEVE KISH
/
C
DADE 610880.
I-24 FM TENNESSEE STATE LINE TO TENNESSEE STATE LINE GUARDRAIL/ MAINTENANCE PROJECT MILEAGE : .40 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER:
CONG DI~T. 9 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CHATTANOOGA-TIP I 23
CONG DIST. 9 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CAPITAL 1994
$
31
FED SHARE$
25
GA. SHARE$
3
0TH SHARE $-
3
PE NONE $
0
ROW NONE
$
0
CONST 1994 $ 734
FED SHARE$
661
GA. SHARE$
73
0TH SHARE$
DADE 610940
I-24 FROM TENN STATE LINE TO TENN STATE LINE
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 9
PROJECT MILEAGE : 4.60 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: L. SEABR09K
FUND.SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED.SHARE$
GA. SHARE$
0TH SHARE$
0 0 2300 2070 230
DADE 621230
SR 136/TRENTON FM CR 52 TO SR 58/US 11 INCL INTERCHANGE@ 59 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE: 1.00 MANAGER: H GANNAWAY
CONG DISJ. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y230 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1995
$
410
CONST 1996 $ 2617
FED SHARE$ 2094
GA. SHARE$ 523
0TH SHARE$
.' ...
~
~
~ ..=~
~,!:~
~:c:-E
= ~
=~ ,:;,~ , ~
1w1-..,.;::1;.;.:.,n,;-;,;;1,,
11.~,(K.~,
~:,~1~i
r~:"' :;
~~'.-: -
"
.. f!,4~:,S.,).";~'i
...
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 103
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ----------------P-R-O-J-ECT--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DADE
SR 136 FM CR 52 TO SR 58; TO SHOW IM FUNDS FOR INT WITH I-59
PE NONE $
0
62Y230 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 9
ROW 1995
$
100
PROJECT MILEAGE : .00
CONST 1996
$
500
MANAGER:
FUND SOURCE: I-STATE MAINT.
FED SHARE$
450
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
50
621230 IS AN ASSOCIATED PROJECT.
0TH SHARE$
DADE 630915
SR 136 E/TRENTON EB 6.4-7.2/EB 10.6-11.85/WB 10.6-11.85 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.05 MANAGER: BILL MCVEY
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$
147
CONST 1995 $ 1613
FED SHARE $ 1290
GA. SHARE $
323
0TH SHARE $
DADE 631070
BURKHALTER GAP RD EXT FM SR 189 TO CR 392/WALKER [& BR] CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: BILL MCVEY (M)
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
(-
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 104
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO,
PROJECT DATA
--------------------------------------
---------------------------------------CO--M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DAWSON SR 9 FM SR 53 TO NEAR CR 54;SR 53 FM S/CR 167 TO CS 501
PE 1993 UNDERWAY
122040 TURN LANES/ TRAFFIC
CONG. DIST. 9
ROW LOCL
PROJECT MILEAGE : 1.00 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST
AFTER 96
MANAGER: L. OWENS (M)
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
r_.
v
,. ,,_
. '
.. 1
~
~
~
~
~
~
~
r,:!i,-.i,!~
~!!!~
., ~ /""'':-, 4
'i, r ~.:.ij
1,::..,
}~::~ r y,~,
r;~ r . .~1;
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
DECATUR 431050
SR 309@ BIG SLOUGH CREEK EAST OF SR 97 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
~ -...~~
..
!
16-Sep-1993 Page 105
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1994
$
5
CONST 1995
$
409
FED SHARE $
327
GA. SHARE $
82
0TH SHARE $
(
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-;-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 106
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
'
----------------------------------------------------------------------------------
DEKALB TRANSIT TRAVELER DEMONSTRATION PROJECT
7D701X TRANSIT PROJECTS/ CAPITAL
CONG DIST. 5
FUNDS RECIPIENT: CITY OF ATLANTA
CAPITAL 1994
$
0
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
DEKALB 7V1016
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY MANAGER: STEVE KISH
(-
CONG DIST. 4 & 11
CAPITAL 1994
$ 100
YUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
80
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
10
0TH SHARE$
10
DEKALB 7V1017
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH
CONG DIST. 4 & 11
CAPITAL 1995
$ 104
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
83
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
11
0TH SHARE$
10
DEKALB 7Vl018
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH
CONG DIST. 4 & 11
CAPITAL 1996
$ 107
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
86
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
10
0TH SHARE$
11
DEKALB 710323
BIKE/PEDESTRIAN WAY - MORELAND AVE TO STONE MTN PARK BICYCLE/PED. FACILITY/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. BOULINEAU
ATLANTA TIP f DK 121 CONG DIST. 4 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
1920 1536
64 320
DEKALB 712120
REDAN RD BR WON OVER I-285 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .20 MANAGER: BILL MOSKAL
ATLANTA TIP f DK-R 35 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL
CONST
UNDERWAY AFTER 96
DEKALB 712450
I-285@ ST MT FWY;L'NCEVILLE HWY; BTWN US 78 & L'NEVILLE HWY
RAMP/ NEW CONSTRUCTION PROJECT MILEAGE : .94 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BILL MOSKAL
ATLANTA TIP f DK-R 107 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 71Y450 IS AN ASSOCIATED PROJECT. -
PE 1989 UNDERWAY ROW 1990 UNDERWAY CONST 1994 $ 3509
FED SHARE$ 2807 GA. SHARE$ 702 0TH SHARE$
,. ,,.
,.
.' ,...
~
~
~
~
Ji?'J;,..oli;'d
li!-~'!IJ
~~Z.2~-~!J
-"""'o.,;
~~
fa~~~~~~
~Ltl
fX;:&;l(i
1:,,'"".,
i:" . ,,.,;
~v..--;,~-;-f
.,,
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
1 6 - s - - 1, - 1 9 9 3 Page 107
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
D-PE-K-.IA-.L-NB-O--. --I--2-0-@ ---L-I-T-H-O-N--IAP-R-O-IN-JED-CU-T-S-TD-RA-IA-TAL---BL-V-D------------------------------------A-T-L-A-N-T-CA-O-M.T-MI-PE-N-fT-S-R--5-9----------------------P-EY-E-A1-R9-9-3-----U-NE-DS-TER-SW--AY
712870 INTERCHANGE/ NEW CONSTRUCTION
CONG DIST. 11
ROW 1995 $ 5840
PROJECT MILEAGE : .40 - EXIST. LANES: 0 /PROPOSED LANES: 4
CONST 1996 $ 2027
MANAGER: G. ROSS
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE $ 1622
FEDERAL HIGHWAY ADHIN FUNDS
GA, SHARE $
405
71Y870 IS AN ASSOCIATED PROJECT.
0TH SHARE $
DEKALB I-285 FM MP O - 21; MP 31.3 - 46.9; MP 56.2-62.7;SEE FULTON
ATLANTA TIP f R 130
PE NONE
$
0
71300X UNKNOWN/ UNKNOWN
CONG DIST. 5
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
0
MANAGER:
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
713000 IS AN ASSOCIATED PROJECT,
0TH SHARE$
DEKALB 71307X
I-285 EB 49 SIGNS FM JONESBORO RD TO GLENWOOD RD ... FULTON
SIGNING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK
ATLANTA TIP f R 130
PE NONE
$
0
CONG DIST. 5 & 6
ROW NONE $
0
CONST 1994
$
0
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
713075 IS AN ASSOCIATED PROJECT,
0TH SHARE$
DEKALB 713100
COTILLIAN DR/SAVOY DR ONE-WAY PAIR ON EACH SIDE OF I-285 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. PROJECT MILEAGE : 1.03 MANAGER:
ATLANTA TIP f DK 117 CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
116
FED SHARE$
104
GA. SHARE$
12
0TH SHARE$
DEKALB 71314Z
COMMUNICATION CABLE ON I-75 FROM I-85 NORTH TO I-285 .. FULTON
MISCELLANEOUS IMPROVEMENTS/ TRAFFIC
t
PROJECT MILEAGE : 5.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
ATLANTA TIP f R 169 CONG DIST. 5 & 6
PE NONE
$
0
ROW NONE $
0
CONST 1994 $
0
MANAGER: BURT RIDDLE
FUND SOURCE: CONG HIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $. GA. SHARE$
0TH SHARE$
DEKALB 713200
I-285 FM INTERCHANGE@ I-20 E TO INTERCHANGE@ I-85 N
BARRIERS/ MAINTENANCE PR9JECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ATLANTA TIP f R 130 CONG DIST. 4
FUND SOURCE: I-STATE CONST. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
165
FED SHARE$ 149
GA. SHARE$
17
0TH SHARE$
DEKALB 71Y450
I-285@ ST HT FWY:L'NCEVILLE HWY: BTWN US 78 & L'NEVILLE HWY
RAMP/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:.BILL MOSKAL
ATLANTA TIP f DI<-R 107 CONG DIST. 4.
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712450 IS AN ASSOCIATED PROJE;CT,
PE 1989 UNDERWAY
ROW 1990 UNDERWAY
CONST 1994
$
250
FED SHARE $ 225
GA. SHARE $
25
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 108
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
-------------------
PROJECT DATA
---
-------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DEKALB I-20@ LITH IND BLVD - SHOWN FOR REMAINING UNFUNDED CST$
ATLANTA TIP f R 59
PE NONE $
-0
71Y870 INTERCHANGE/ NEW CONSTRUCTION
CONG DIST; 11
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 4
CONST 1996 $ 5973
MANAGER: G. ROSS
.
-
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE$ 4778
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$ 1195
712870 IS AN ASSOCIATED PROJECT.
0TH SHARE $.
DEKALB 721050
SR 124@ STONE MOUNTAIN CRK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .50 MANAGER: D. GODWIN
j
ATLANTA TIP f DK.99 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
DEKALB 721055
SR 124@ YELLOW RIVER/ ALSO GWINNETT CO
REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .03
.
MANAGER: RAY METTS (C/M)
ATLANTA TIP f DK 100 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
1
AFTER 96
DEKALB 72127X
SR 42/MACON HWY FM S/ANVILBLOCK RD TO OLD TONY RD/CLAYTON RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE: .00. MANAGER: M. REYNOLD~
DEKALB 721330
SR 124/ROCK CHAPEL RD FM UNION GR RD N TO PLEASANT HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .90 MANAGER: D. GODWIN
ATLANTA TIP f CL10/DK8 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721270 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 84 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1992 UNDERWAY
CONST 1996 $
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1993 ROW 1996 CONST
UNDERWAY $ 1481 AFTER 96
DEKALB 721350
SR 12/COVINGTON HWY FM SR 124 E TO TURNER HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.20 MANAGER: D. CHURCH (M)
ATLANTA TIP f DK 30 CONG DIST.- 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
DEKALB 721380
SR 857/ROCKBRIDGE RD FM SR 10/MEMORIAL DRE TO HAIRSTON RD
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.20
.
MANAGER: .M. REYNOLDS (M)
r.
ATLANTA TIP f DK 25
CONG DIST. 4
.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
:,
...
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
. .,
~
~
~
~
~~~
~~11.ll
~:m
~-m~
r,~1;~;:_i, . ~ . ~
~;,.~_'1',(1,
i';:-:"'./:N
l:i.:':
('~. ,Gd
... ~_,_.,.._V;:~
>
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 109
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DEKALB SR 857/ROCKBRIDGE RD FM HAIRSTON RD TO ST MTN-LITHONIA RD
ATLANTA TIP f DK 25
PE 1992
UNDERWAY
721390 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 4
ROW
AFTER 96
PROJECT MILEAGE : 1.90
CONST
AFTER 96
MANAGER: M. REYNOLDS (M)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 721400
ASHFORD-DUNWOODY/JOHNSON FERRY FM PTREE IND BLVD TO I-285 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.80 MANAGER: G. ROSS
DEKALB 721405
ASHFORD-DUNWOODY RD@ NANCY CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .02 MANAGER: G. ROSS
DEKALB 721530
SR 124 FM ROCKBRIDGE RD TO CENTERVILLE-ROSEBUD RD/GWINNETT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.10 MANAGER: RAY METTS (C/M)
ATLANTA TIP f DK 22
CONG DIST. 4 & 5
.
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
721405 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 22 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721400 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f GW 76 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
PE 1992 ROW 1996 CONST
UNDERWAY $ 6737 AFTER 96
DEKALB 721535
SR 124 FM PLEASANT HILL RD TO ROCKBRIDGE RD/ INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.92 MANAGER: D. GODWIN
ATLANTA TIP f DK 85 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 2327 AFTER' 96
DEKALB 721880
STONE MOUNTAIN FREEWAY AT HUGH HOWELL ROAD INTERCHANGE INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.20 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: NEIL DAVIS
DEKALB . SR 212/BROWNS MILL RD@ POLE BRIDGE CRK 730970 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES .
.PROJECT MILEAGE : .15
MANAGER: D. GODWIN
ATLANTA TIP f DK-R 117 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 98 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
10
CONST 1996
$ 3267
FED SHARE $ 2614
GA. SHARE $
653
0TH SHARE $
PE 1993 UNDERWAY
ROW 1994
$
10
CONST 1995
$
498
FED SHARE $
398
GA. SHARE $
100
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 110
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
------------------------- ----------
DEKALB REDAN RD@ SNAPFINGER CRK
---------- ------- -----A-T-L-A-N.-T-AC-O-MT-MI-PE-N-fT-S-R-T-P--D-K---2-3-----------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY
751270 REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
CONG DIST . 4
ROW LOCL
PROJECT MILEAGE : .10 MANAGER: BILL MOSKAL
FUND SOURCE: BRIDGE PROGRAM
CONST
AFTER 96
r_
FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 751320
CR 5189/ROCKBRIDGE RD@ SNAPFINGER CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .28 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f DK 101 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW LOCL CONST
UNDERWAY AFTER 96
DEKALB 751340
CR 23/FAYETTEVILLE RD@ SUGAR CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .50 MANAGER: D. GODWIN
DEKALB 751370
CHAMBLEE-TUCKER RD FM NEW P'TREE RD TO BUFORD HWY/SR 13 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.40 MANAGER: D. GODWIN
ATLANTA TIP f DK 111 CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 1 C_ONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGH.WAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 421
FED SHARE$ 337
GA. SHARE$
84
0TH SHARE$
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96'
DEKALB 751380
CHAMBLEE-TUCKER RD FM I-85 TO I-285 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.30 MANAGER: D.SMITH (C)
DEKALB 751440
WINTERS CHAPEL RD FM OAKCLIFF RD TON/CHICOPEE RD(& SIGNAL) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE.: .90 MANAGER: G. ROSS
DEKALB 751445
WINTERS CHAPEL-OAKCLIFF RD CONN@ SOUTHERN RR BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .08 MANAGER: G.ROSS
ATLANTA TIP f DK 17. CONG DIST. 4
FUND SOURCE: I-STATE CONST. FEDERAL.HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 44 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 75Y440 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 94 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 751440.IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 5009
FED SHARE$ 4258 GA. SHARE$ 751 0TH SHARE.$
PE 1992 UNDERWAY
ROW LOCL CONST 1995
-'
$ 6609
FED SHARE$ 5287
GA. SHARE$ 1322
0TH SHARE$
PE 1992 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
....
... >
-~
-~
-==
~~
~
~
~
lffl~-4~5
~
"'-"''=-41
~
.......,;,,~
ln-'
.,-.
~-:- ,--._._~\
~:;7r,:::., ...:.-1
t:-:=T:~~~
~~~-it~
- ~~--..";:-".!
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
16-Sep-1993 Page 111
FISCAL YEAR
COST ESTS
DEKALB 751490
SR 859/COOLEDGE-BROCKETT RD FM E PONCE DE LEON TO ST MTN FWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .30 MANAGER: D. GODWIN
ATLANTA TIP f DK 79 CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1996
$ 1307
FED SHARE $ 1046
GA. SHARE $
261
0TH SHARE $
DEKALB 751495
SR 859/COOLEDE-BROCKETT RD FM STONE MTN FWY-SR 8/W SIGNALS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.00 MANAGER: D. GODWIN
ATLANTA TIP f DK 79 CONG DIST. 4 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$
42
AFTER 96
AFTER 96
DEKALB 751940
CR 5109/STEPHENSON RD@ CROOKED CRK
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .18
.
MANAGER: D. GODWIN
ATLANTA TIP f DK 97 CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 752100
EAST PONCE DE LEON AT RAYS ROAD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .28 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN
ATLANTA TIP f DK102 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 752110
SR 154/MEMORIAL DRIVE@ WHITEFOORD AVE. INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .12 - EXIST. LANES: 3 /PROPOSED LANES: 4
MANAGER: D. GODWIN
ATLANTA TIP f AT 29 CONG DIST. 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 752470
SR 236 AT NORTHLAKE PARKWAY AND SIGNAL SYSTEM TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP f DK 119 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 752480
SR 155/CANDLER RD FM COLUMBIA/CLIFTON SPR TO SR 260 GLENWOOD
SIGNALS/ TRAFFIC PROJECT MILEAGE : 3.60 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
ATLANTA TIP f DK 120 CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1991
UNDERWAY
ROW LOCL
CONST 1995 $ 272
FED SHARE$ 218
GA. SHARE$
54
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1995
$
158
FED SHARE$
142
GA. SHARE$
16
0TH SHARE$
PE NONE $
0
ROW 1994
UNDERWAY
CONST 1994
$
91
FED SHARE$
82
GA. SHARE$
9
0TH SHARE$
PE 1994
$
7
ROW 1995 $
10
CONST 1996
$
231
FED SHARE$
208
GA. SHARE$
23
0TH SHARE$
PE NONE
$
0
ROW NONE
$
0
CONST 1994
$
384
FED SHARE$
346
GA. SHARE$
38
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 112
----------------------------------------------------------------- COUNTY
P. I.NO.
DESCRIPTION PROJECT DATA
DEKALB WINTERS CHAPEL RD FM OAKCLIFF RD TON/CHICOPEE RD (&SIGNAL)
COMMENTS ATLANTA TIP f DK 44
FISCAL YEAR
PE 1992
COST ESTS
UNDERWAY
75Y440 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
CONG DIST. 4
ROW LOCL
PROJECT MILEAGE : .00 MANAGER: G. ROSS
FUND SOURCE: OLD URBAN SYSTEM
CONST 1995 $
1
FED SHARE$
1
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
751440 IS AN ASSOCIATED PROJECT.
'0TH SHARE $
DEKALB 770280
CR 690/ALFORD RD@ CROOKED CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .25 MANAGER: D. GODWIN
ATLANTA TIP I DK 96
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1991 UNDERWAY
ROW LOCL
CONST 1994
$
220
FED SHARE$
176
GA. SHARE$
44
0TH SHARE$
DEKALB 770440
PEDESTRIAN/LANDSCAPING ALONG US 278 IN AVONDALE BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
l.
DEKALB 770480
SOUTH DECATUR TROLLY LINE CONVERSION BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : 00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
DEKALB 770530
D'TOWN ST'SCAPES IN DECATUR;SIDEWALKS,X-WALKS,BENCHES,TREES MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ATLANTA TIP f DK 114 CONG DIST. 4
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t DK 116
CONG DIST. 4 & 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I DK 115
CONG DIST. 4
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1995 $
90
FED SHARE$
72
GA. SHARE$
0TH SHARE$
18
PE LOCL
ROW LOCL
CONST 1996
$
625
FED SHARE$
500
GA. SHARE$
0TH SHARE$
125
PE LOCL
ROW LOCL
CONST 1994
$
750
FED SHARE$
600
GA. SHARE$
0TH SHARE$ 150
DEKALB 770603
TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN DEKALB COUNTY
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
ATLANTA TIP f DK 118 CONG DIST. 4 & 11
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $'
ROW NONE $
CONST.1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
50 0
1108 886 1 221
DEKALB 770640
CR 299/N CLARENDON AVE AT CSX RAILROAO ... f279941U
RR XING / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$-
0
ROW NONE $
0
CONST 1994
$
81
FED SHARE$
73
GA. SHARE$
8
0TH SHARE $
t
o
. '
~
-~
~~
=I C=-
~~
~
~mH~
f~l~i}';1~;
~~
1,~ . -~'~1
rt:~:fJ
~.:~
~i.l~
~~
~
"
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS
DEKALB 770650
CR 899/LAREDO DR AT CSX RAILROAD ... f279944P
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
i~~~-~1
t
.,,
16-Sep-1993 Page 113
FISCAL YEAR
COST ESTS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
76
FED SHARE$
68
GA. SHARE$
8
0TH SHARE$
DEKALB 81104X
OVERLAYS FOR 013-0013,089,0089,119-0002,119-0040,139-0004
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 10 & 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
C .
I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
Page 114
COUNTY
DESCRIPTION
--P-.I-.-NO--. ---
PROJECT DATA
--
DODGE COUNTY OPERATED PUBLIC TRANSIT SERVICE
FISCAL
COST
.
---- COMMENTS----------------------------Y-E-A-R--------E-S-T-S--
2Bll03 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 8
FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
OPERATING 1994 $
75
FUND SOURCE: RURAL TRANSIT
FED SHARE$
45
FEDERAL TRANSIT ADHIN FUNDS
GA. SHARE$
0TH SHARE$
30
DODGE 2Bl104
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
CONG DIST. 8
OPERAT-ING 1995 $
79
FUND SOURCE: RURAL TRANSIT
FED SHARE$
47
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
32
DODGE 2Bl105
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1996 $
84
FUND SOURCE: RURAL TRANSIT
FED SHARE$
50
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
34
DODGE 2C2103
ONE CONVERSION VAN, ONE STANDARD VAN, AND TWO MOBILE RADIOS
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
CONG DIST. 8
CAPITAL 1994
$
50
FUND SOURCE: RURAL TRANSIT.
FED SHARE$
40
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
0TH SHARE$
5
DODGE 2C2104
ONE CONVERSION VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
CONG DIST. 8
CAPITAL 1995
$
30
FUND SOURCE: RURAL TRANSIT
FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
DODGE 221970
SR 87/US 23 /EASTMAN FROM NW OF CR 141 TO NW OF CR 332 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE : .60 MANAGER: D. GRIFFITH
DODGE 231340
r . SR 27@ SR 87, SECOND AVE, SR 46 IN EASTMAN SIGNALS/ TRAFFIC PROJECT MILEAGE : .. 50 - EXIST. LANES: 3 /PROPOSED LANES: 3 MANAGER: BURT RIDDLE
CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$
381
FED SHARE $ 305
GA. SHARE $
76
0TH SHARE $
PE NONE $
0
ROW 1994 $
5
CONST 1994 $ 150-
FED SHARE$ 150
GA .. SHARE $
0TH SHARE$
:t-
..
. .,
~
~
~
~
~
~
R21)W.:JJ
~~
~
j,,:;.~:-~li.l
1"&:'f':.i '(".-.::~,~~
li1~:~-~~1
1/rr:;:~~1~-~
~i<;~,j
~,i;.:,;.'-,:,._-:n;-,!
"
$'
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 115
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--, ----------------PR--O-JE-C--T--D-A-T-A------.---------------------------------------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
DOOLY CITY OPERATED PUBLIC TRANSIT SERVICE
3Bl218 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 2
FUNDS RECIPIENT: CITY OF VIENNA
OPERATING 1994
$
13
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
5
DOOLY 3B1219
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH
CONG DIST. 2
I
OPERATING 1995 $
13
FUND SOURCE: RURAL TRANSIT
FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
5
DOOLY 3B1220
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1996 $
13
FUND SOURCE: RURAL TRANSIT
FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
5
DOOLY 3B1422
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1994 $
32
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
19
GA. SHARE$
0TH SHARE$
13
DOOLY 3B1423
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1995 $
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
20
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
13
DOOLY 3B1424
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1996 $
34
FUND SOURCE: RURAL TRANSIT
FED SHARE$
20
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
DOOLY 3C2218
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH
CONG DIST . .2
CAPITAL 1994
$
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 116
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
D-O-O-L-Y-----O-N-E--C-O-N--V-E-R-SI-O-N--V-A-N--W--IT-H--L--IF-T--A-N-D--O--N-E-M--O-B-IL-E---R-A-D-IO--------------------------------------------------------------------------
3C2422 TRANSIT FACILITIES/ CAPITAL
CONG DIST. 2.
FUNDS RECIPIENT: CITY OF UNADILLA
CAPITAL 1994
$
32
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
DOOLY 3C2423
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH
CONG DIST. 2
CAPITAL 1995
$
20
FUND SOURCE: RURAL TRANSIT
FED SHARE$
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
DOOLY 311610
I-75 UPGRADE REST AREAS fl3 & 14(DOOLY) AND f 22 (MONROE) REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER:
L
CONG DIST. 2 & 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
ROW NONE $
CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
172
0 5730 5157
573
DOOLY 321610
SR 90@ SANDY MOUNT;LITTLE PENNAHATACHEE;TURKEY CK & TRIB REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PR0JECT MILEAGE : 1.20 MANAGER: GORDON BROWN
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1990 UNDERWAY
ROW 1995 $
32
CONST 1996 $ 173.4
FED SHARE$ 1387
GA. SHARE$ 347
0TH SHARE$
DOOLY 371210
CR 25 OVER HOGCRAWL CREEK 9 MI WEST OF UNADILLA REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. PROJECT MILEAGE : .21 MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
10
ROW LOCL
CONST 1996 $ 290
FED SHARE$ 232
GA. SHARE$
58
0TH SHARE$
,,
,-
. '
~
~
~ .. ~_i:~,
-=,.,..-_c;;,
r!'@.!!u~
~
tlfl.;t"'R!.J
r;;M"l'!,l
!.:." ..:::j
~--:f:1
"
,'~'~. ,'.~~.
:,T,J
l ' ' , ,.. ,.,.,:,
... """~~~-/
~-.~,,...~.
t
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 117
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O-.----------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGHERT WHEELCHAIR LIFTS FOR PARATRANSIT VEHICLES (ADA)
401013 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 2 & 8
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
CAPITAL 1995
$
5
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
5
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
DOUGHERT WHEELCHAIR LIFTS FOR TRANSIT COACHES (ADA) 401015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 2 & 8
CAPITAL 1996
$
50
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
45
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
DOUGHERT CONCRETE REPLACEMENT FOR TRANSIT STATION 404010 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM. MANAGER: STEVE KISH
CONG DIST. 2 & 8
CAPITAL 1994
$ 166
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
133
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
16
0TH SHARE$
17
DOUGHERT VEHCLES, SHELTERS, FACILITY IMP., CAP. MAINT., ETC. 404011 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 2 & 8
CAPITAL 1995
$ 101
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
81
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
10
0TH SHARE$
10
DOUGHERT FACILITY IMP., CAP. MAINT., SHELTERS, FURNITURE, EQUIP., ETC
404012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
,
MANAGER: STEVE KISH
CONG DIST. 2 & 8
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
1527 1222
152 153
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY
404016 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL'TRANSIT ADMIN FUNDS
OPERATING 1994 $ 780 FED SHARE$. 390 GA. SHARE$
0TH SHARE$ 390
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY 404017 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH
CONG DI~T. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ 717 FED SHARE$ 359
GA. SHARE $
OT~ SHARE$ 359
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 118
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--, -I.-N-O--, ---------------P-R-O-J-E-C-T-.-D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY
4D4018 TRANSIT PROJECTS/ OPERATIONS
CONG DIST. 2 & 8
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
OPERATING 1996 $ 737
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT
FED SHARE$
369
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
369
DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 4V1010 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH
CONG DIST. 8 & 2
CAPITAL 1994
$
20
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
16
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
OOUGHERT ELDERLY AND DISABLED VEHICLES ANO EQUIPMENT 4V1011 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA
MANAGER: STEVE KISH
CONG DIST, 8 & 2
CAPITAL 1995
$
21
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
17
FEDERAL TRANSIT.ADMIN FUNDS
GA, SHARE$
2
0TH SHARE$
2
DOUGHERT ELDERLY ANO DISABLED VEHICLES AND EQUIPMENT 4V1012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH
DOUGHERT SR 91/ PHILEMA RO IN ALBANY@ MUCKAFOONEE CREEK 421270 REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDEO LANES.
PROJECT MILEAGE :- .26 MANAGER: 0, CHURCH
CONG DIST. 8 & 2
CAPITAL 1996
$
22
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
ALBANY TIP I B-2
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421420 IS AN ASSOCIATED PROJECT.
PE 1986 UNDERWAY
ROW NONE $
0
CONST 1995 $ 1555
FED SHARE $ 1244
GA. SHARE $
311
0TH SHARE $
DOUGHERT PHILEMA RD FM SR 133 TO LEE CO LINE/EXCL BR@ MUCKAFOONEE CK 421420 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1,90 MANAGER: O. CHURCH (M)
ALBANY TIP I H/R-9
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421270 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY ROW LOCL
CONST 1995 $ 2408 FED SHARE$ 1926 GA. SHARE$ 482 0TH SHARE$
OOUGHERT SR 520/US 82/0GLETHORPE BLVD FM US 19 TO LOFTUS ST/ALBANY 421580 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : ,50 MANAGER: D. CHURCH
ALBANY TIP I HR/11
CONG DIST. 8
GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995 $ 946
FED SHARE $ 757
GA. SHARE $
189
0TH SHARE $
,.
,
.. ,-,
~
~
~ ~
'I
~
Q='ll
P..!!1~
~
~-;,!i!i"@ L ~
}!.. .-~~~:
f,
~-:",>~ I)
t'"' ~fti
l;::;.,:: . . . . .::
\(,~~-'-.',...,"l~{
i'i~
... i . , - . - , ..._,;;,'.
.. '
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-,1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 119
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
D-PO--U. -GI.-HN-EOR-T-. -S-R--3-/-U-S---19--A-T--P-PRR-OO-C-JET-CO-TR---D&-A-GTA-A-M-B-L-E--IN---A-L-BA-N-Y---------------------------A-L-BA--N-Y-C-OT-MI-PM-E-IN-T-HS-/-R---2----------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--0
422330 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 2
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
116
MANAGER:
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
116
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
DOUGHERT CR 459/COUNTY LINE RD@ PINEY WOOD CRK 431200 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .19 MANAGER: J. LINDSEY
ALBANY TIP I B-1
CONG DIST. B
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$
427
FED SHARE$
342
GA. SHARE$
85
0TH SHARE$
DOUGHERT RADIUM SPRINGS RD FM GARDEN HILL DR TO WHITEHEAD RD
450320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.10
MANAGER: D. CHURCH (C)
ALBANY T~P I H/R-10
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
1674 1339
502 837
DOUGHERT CR 539/DAWSON RD@ SR 520/US B2/LIBERTY XWAY ... & LEE CO 450400 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : 1.00 MANAGER: D. CHURCH
ALBANY TIP I H/R-13
CONG DIST. B
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW LOCL
CONST
UNDERWAY AFTER 96
DOUGHERT D'TOWN ENHANCEMENT OF ALBANY/TRAILS,LANDSCAPING,RAIL TERMINA 470910 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
ALBANY TIP I TSM-5
CONG DIST, 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
DOUGHERT BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT f4
470990 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 $ ROW 1996 $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
so
. 200 1844
1475
50 419
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0 1242
994 248
GEORGIA DEPARTMENT OF TRANSPORTATION_
16-Sep-1993
STATE TRANSPORTATIQ'1 IMPROVEMENTS PROGRAM
Page 120
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P.I.NO.
PROJECT DATA
---------------------- ---------
--
DOUGLAS COUNTY OPERATED PUBLIC VANPOOL SERVICE
FISCAL
COST
- ------.-- COMM-E-N-TS----------------------------Y-E-AR---------E-S-T-S--
7Bl393 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 7
FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
OPERATING 1994 $
13
FED SHARE$
50
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
13
DOUGLAS 7Bl394
COUNTY OPERATED PUBLIC VANPOOL SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH
CONG DIST. 7
OPERATING 1995
$
18
FUND SOURCE: RURAL TRANSIT
FED SHARE$
66
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
18
DOUGLAS 7Bl395
COUNTY OPERATED PUBLIC VANPOOL SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPI:ENT: DOUGLAS MANAGER: STEVE KISH
CONG DIST. 7
OPERATING 1996 $
18
FUND SOURCE: RURAL TRANSIT
FED SHARE$
68
FEDERAL.TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
18
DOUGLAS 707031
PARK AND RIDE LOT I-20 & CHAPEL HILL RD.
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT- ADMIN FUNDS
CAPITALl994
$ 587
FED SHARE$ 470
GA. SHARE$
59
0TH SHARE$
59
DOUGLAS 7D7032
TRANSIT PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH
CONG. DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1995
$ 211
FED SHARE$ 169
GA. SHARE$
21
0TH SHARE$
21
DOUGLAS 7D7033
CAPITAL PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY
MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$ 211
FED SHARE$ 169
GA. SHARE$
21
0TH SHARE$
21
DOUGLAS 7Vl019
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENICES IN DOUGLAS COUNTY
MANAGER: STEVE KISH
CONG DIST . .-. 7
CAPITAL 1994
$
11
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
9
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1:
0TH SHARE$
1
.,
,-
.. ,.
,
-
lli,ii9
~
~ ,~
~~
I!!!!~~~
~~!~!~!
~~
~r::~:!'l
f::.....~
~a.t'iil ~
C
~r.r(~-.-...;--:'.
t .. : . ..:~
. .~ ~ ~
~--~/.i.,j t1,1
p-;-;,, 4.
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 121
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-,-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGLAS ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
7V1020 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 7
FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY
CAPITAL 1995
$
11
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
9
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
DOUGLAS 7Vl021
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL . FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY
MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1996
$
12
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
10
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
DOUGLAS 720970
SR 92 EXT/DOUGLASVILLE FM SR B NW TO SR 92 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 1.20 MANAGER: BILL MOSKAL
ATLANTA TIP f DO 2
PE 1996 $- 150
CONG DIST. 7
ROW
AFTER 96
r.
CONST
AFTER 96
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
DOUGLAS 721320
BANKHEAD HWY FM SWEETWATER RD E TO THORNTON RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 1.30 MANAGER: D. SMITH
ATLANTA TIP I DO 16
CONG DIST. 7
FUND SOURCE: SURFACE.TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AF.TER 96 AFTER 96
DOUGLAS 721420
SR 92 FM S/SR 166 NE TO LAKE MONROE RD/CR 140 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.26 MANAGER: N. PASSMORE (M)
ATLANTA TIP f DO 28 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 1095~
AFTER 96
DOUGLAS 721435
SR 5/BILL ARP RD@ DOG RIVER SW OF DOUGLASVILLE REPLACEMENT OF THE EXISTING BRIDGES{$). FROM 2 TO 3 LANES.
PROJECT MILEAGE : .20 MANAGER: D. GODWIN
DOUGLAS 721470
SR 5 N&SB FM $/SWEETWATER RD TO S/DOG RIVER BRIDGE ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1,75 MANAGER: D, GODWIN
ATLANTA TIP f DO 42 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DO 38 CONG DIST. 7.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
1
CONST 1995
$
913
FED SHARE $ 730
GA. SHARE $ 183
0TH SHARE $
PE 1992
UNDERWAY
ROW 1993 UNDERWAY
CONST 1996 $ 790
FED SHARE $
632
GA. SHARE $
158
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 122
COUNTY
P.
-
I.N-O--. -----
DESCRIPTION
PROJECT DATA
--
-----
FISCAL.
COST
-----------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGLAS SR 8/US 78/BANKHEAD HWY FM SR 92 EAST TO CR 15/SWEETWATER RD 721590. RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
ATLANTA TIP f DO 29 CONG DIST. 7
PE 1992 ROW
UNDERWAY AFTER 96
PROJECT MILEAGE : 5.90
CONST-
AFTER 96
MANAGER: D. SMITH (M)
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
DOUGLAS 721770
SR 166 FM OLD LOWER RIVER RD/DOUGLAS TO SR 70/FULTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2,91 MANAGER: RON BRAZIEL (M)
ATLANTA TIP f DO 19 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER96
AFTER 96
DOUGLAS 742800
LOWER RIVER RD FM SR 92 TO CAMP CREEK PKWY/FULTON RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 6,30 MANAGER: K FULBRIGHT {M)
ATLANTA TIP f DO 21 CONG DIST. 7 & 5
FUND SOURCE: SURFACE TRANSPORT. rEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$ 250 AFTER 96
DOUGLAS 751820
DOUGLAS BLVD EXT FM CR 814 TO CR 115 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 1,80 MANAGER: RON BRAZIEL (M)
ATLANTA TIP f DO 32 CONG DIST. 7
.FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL .90NST
$ 103 AFTER 96
DOUGLAS 751825
DOUGLAS BLVD EXT FM CR 142 TO CR 814 CONSTRUCTIONOF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.00 MANAGER: RON BRAZIEL (H)
ATLANTA TIP f DO 31 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS
PE 1996
ROW LOCL CONST
$ 103 AFTER 96
DOUGLAS 751970
CR 24/N BURNT HICKORY RD@ GOTHARD CREEK
1.
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .20
MANAGER: D. GODWIN
DOUGLAS 770162
CR 39/0LD ALABAMA RD@ SWEETWATER CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER: D. GODWIN
ATLANTA TIP f DO 41 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DO 39 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$
386
FED SHARE$
309
GA. SHARE$
77
0TH SHARE$
PE 1992
UNDERWAY
ROW LOCL
CONST 1994
$
644
FED SHARE$ 515
GA. SHARE$
129
0TH SHARE$
,,
\.
<
.. ,,,
~
~
~
't-."/=i'~~
'
!if~
!l~~:ffi
1,~
[lr!i!iffi
~;frr]
,. li.'",:~~;e, ~:-.:!.l!l ~ 12
~~
Jb,.~:ir:~~
~
!---;,-~ !"
4,,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 12.3
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EARLY US 27@ WAMBLE CREEK SOUTH OF BLAKELY
PE 1992 UNDERWAY
421640 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 2
ROW NONE
$
0
PROJECT MILEAGE : .50
GRIP PROJECT
CONST 1996
$
230
MANAGER: RON BRAZIEL (M)
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
184
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
46
422210 IS AN ASSOCIATED PROJECT.
0TH SHARE $
EARLY 422090
SR 62/BLAKELY FM WEST OF SR 200 TO EAST OF SR 62 BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.70 MANAGER: J. LINDSEY (M)
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
10
AFTER 96
EARLY 431320
SR 1 OVER BLUE CREEK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER:
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1996 CONST
$
10
$
1
AFTER 96
C
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 124
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------CO-M--M-E-N-T-S-----------------.---------Y-E-A-R--------E-S-T-S--
ECHOLS SR 89/US 441 AT LONG CREEK
PE 1996
$
10
422425 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
CONG DIST. 8
ROW NONE
$
0
PROJECT MILEAGE : .00
CONST
AFTER 96
MANAGER: N. PASSMORE (M)
FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
422420 IS AN ASSOCIATED PROJECT.
ECHOLS 431060
SR 187@ SUWANNOCHEEE CRK /ALSO CLINCH COUNTY REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : 1.00
MANAGER: J. LINDSEY
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1994
$ 1719
CONST 1995
$ 1366
FED SHARE $ 1093
GA. SHARE $ 273
0TH SHARE $
(.
. ,,
,.,
,:
~
~ -~
.~ , ~
~,~!ll
~
~.'!.Ii@
iel'!f!.~!!
~~l~
,, ,. ~ ,,.-,.~(::'!
~
~i'i."1
r.cr-:~:..i-.,
~
~. 111
,.._.... .,,,: ~a
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 125
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O- .---------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--
EFFINGHA I-95 FM N/I-16 IN CHATHAM TO S.C. STATE LINE ... SEE CHATHAM
PE 1994 . $
0
51116X UNKNOWN/ UNKNOWN
CONG DIST. 1
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994
$
0
MANAGER: UNKNOWN
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
511160 IS AN ASSOCIATED PROJECT.
0TH SHARE$
EFFINGHA I-16 WIDEN 10 BRIDGES@ MP 138.3; 145.9;- 146.6; 147.2/BRYAN 51119X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
0
ROW NONE $
0
CONST 1996 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
EFFINGHA NEW PARALLEL BR/SR 21@ LITTLE EBENEZER CRK 521705 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS
CONG DIST. 1 GRIP.PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521700 IS AN ASSOCIATED PROJECT.
PE 1990 UNDERWAY
ROW NONE
$
0
CONST 1994
$
170
FED SHARE $ 136
GA. SHARE $.
34
0TH SHARE $
EFFINGHA SR 17&26/US 80 FM SR 17 TO CHERRY ST IN BLOOMINGDALE/O~:ATHAM 522170 RECONSTRUCTION & WIDENIN.G FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .79 MANAGER: M. REYNOLDS (M)
SAVANNAH TIP f 87 H3 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 896 AFTER 96
EFFINGHA CR 307@ EBENEZER CREEK NW OF CR 72
532390 BRIDGES/ REPLACEMENT PROJECT MILEAGE: .11 MANAGER: PETE BLOCKER
CONG DIST. 1 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW LOCL CONST
UNDERWAY AFTER 96
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 126
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
E-L-B-E-R-T-----CO--U-N-TY---O-P-E-R-A-TED P-U--B-L-IC---T-R-A-N-S-IT
SER--V-IC-E----------------------
------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
1Bl008 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 10
FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994
$
81
FED SHARE$
47
GA. SHARE$
0TH SHARE$
33
ELBERT 181009
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1995 $
82
FUND S.OURCE: RURAL TRANSIT
FED SHARE$
48
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
34
ELBERT 181010
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1996 $
87
FUND SOURCE: RURAL TRANSIT
FED SHARE$
51
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
36
ELBERT 1C2008
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT f:1ANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1994
.$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
ELBERT 1C2009
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED .. SHARE $
17
(.
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
ELBERT 1C2010
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
CONG DIST. 10
CAPITAL 1996
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
ELBERT 170990
CR 168/GOSS ROAD@ SOUTH BEAVERDAM CREEK NW OF ELBERTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER:
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $
8
ROW LOCL
CONST 1996. $ 282
FED SHARE$ 225
GA. SHARE$
56
0TH SH~$
~ .,,
.j,
,1
,f ~
~
~
~
~~ti
' ~ -.
~
~
~~j!
~~;~!ii
~~~ill!
~
.'" '\al,
,~:'!'..:.J;.'.i
,;)
}!::::.-,'.!;~
~
f:~~-;..~~i
~:::: .i~
.,. ~~!'
!" '.......~.
4,,
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 127
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
ELBERT CR 183/C'WATER-PLANTATION@ GUM LOG BRANCH N OF ELBERTON
PE 1994
$
5
170991 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
CONG DIST, 10
ROW LOCL
PROJECT MILEAGE : ,19
CONST 1996
$
173
MANAGER:
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
138
. FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
35
0TH SHARE$
,.-,
(
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 128
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EMANUEL COUNTY OPERATED PUBLIC TRANSIT SERVICE
2Bll08 TRANSIT FACILITIES/ OPERATIONS
CONG ors,;. 1
FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
(
FUND SOURCE: RURAL TRANSIT
OPERATING 1994 $
31
FED SHARE$
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
13
EMANUEL 2Bll09
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
CONG DIST. 1
OPERATING 1995 $
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
19
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE$
14
EMANUEL 2Blll0
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
CONG DIST. 1
OPERATING 1996 $
34
FUND SOURCE: RURAL TRANSIT
FED SHARE$
20
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
EMANUEL 2C2108
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
CONG DIST. l
FUND SOURCE: RURAL TRANSIT
CAPITAL 1994
$
32
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
EMANUEL 2C2109
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
CONG DIST. l
CAPITAL 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
EMANUEL 221300
SR 56@ N/S PRONG CANOOCHEE & OFLW;MCKINNEY BR;OGEECHEE OFLW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,80 MANAGER: D. GRIFFITH
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1994 $ 2285
FED SHARE $ 1828 GA. SHARE $ 457
0TH SHARE $
EMANUEL 222210
SR 26/SWAINSBORO@ SOUTHERN RR/REMOVE BR & CONST GRADE XING
BRIDGE REMOVAL/ NEW CONSTRUCTION PROJECT MILEAGE : .30 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GRIFFITH
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1995 CONST .
UNDERWAY
$
23
AFTER 96
i,.
,, ,.-,
'. ,,.,.
~
.-,~ . ~
~ ~
~
~
~
~JfL~
f,tW;,m
h.,:,n ~~
(
I
f-"';#.":l\ll
w~c':;':
f;~,......'{
~
~...
'(~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATI9N IMPROVEMENTS PROGRAM
Page 129
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O-.----------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EMANUEL SR 46@ JACKS CREEK l MILE WEST OF CANDLER CO LINE
PE 1993 UNDERWAY
231130 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 1
ROW 1994
$
1
PROJECT MILEAGE : .30
CONST 1995
$
878
MANAGER: D. GRIFFITH
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
702
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
176
0TH SHARE$
EMANUEL 231380
SR 57/KITE RD@ MCLEOD BRIDGE RD/GOLF RD/ROBIN RD
INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .36 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH
CONG DIST. 1
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1994
$
9
CONST 1994
$
267
FED SHARE$ 240
GA. SHARE$
27
0TH SHARE$
EMANUEL 250460
OLD NUNEZ RD/CR 461 FM MEADOWLAKE PKWY/CR 365 TO SR 56/57 MINOR WIDEN & RESURF / RECST. OR REHAB. PROJECT MILEAGE : .95 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: D. GRIFFITH
CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994
$
658
FED SHARE$
526
GA. SHARE$
132
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 130
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
----------------------------------------
----------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EVANS SR 73/US 301 FM TATTNALL CO LINE TO S CL/CLAXTON
PE 1993
UNDERWAY
522005 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
CONG DIST. 1
ROW 1995
$
200
PROJECT MILEAGE : 6.75
,
CONST
AFTER 96
MANAGER: PETE BLOCKER
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY AOMIN FUNDS
4
I 4
. '.
.,
Jm!ll!l!!I!
. ,, ~
~~
~ .
~
~
!i!~U~
~,i}'t!~
MJ
1~>. :~:~ ~ *
'tji;~:,;,':1
~~::~:-;-::~-;
i::~;~~1
:-: -. ::.:
~
..
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 131
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------------------------------------------------------- ---------------------------------------------------------------
FANNIN COUNTY OPERATED PUBLIC TRANSIT SERVICE
6B1348 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: FANNIN
OPERATING 1994
$
76
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
44
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
32
FANNIN 6Bl349
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
79
FUND SOURCE: RURAL TRANSIT
FED SHARE$
46
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
33
FANNIN 6Bl350
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1996 $
82
FUND SOURCE: RURAL TRANSIT
FED SHARE$
48
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
34
FANNIN 6C2348
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1994
$
31
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
FANNIN 621340
SR 5 FM SR 2/BLUE RIDGE N TO PROP MCCAYSVILLE BYP- NR CR 138 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 7.80 MANAGER: J. GRAYBEAL (M)
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FANNIN 630875
SR 60@ HEMPTOWN CRK/MINERAL BLUFF; @ YOUNG STONE CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .36 MANAGER: BILL MCVEY
FANNIN 63Y875
(_
PROJECT SHOWN FOR "STP" FUNDS ONLY ... SEE 630875 UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 63Y875 IS AN ASSOCIATED PROJECT.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630875 IS AN ASSOCIATED PROJECT.
PE 1988 UNDERWAY
ROW 1989 UNDERWAY
CONST 1994
$
611
FED SHARE $
489
GA. SHARE $
122
0TH SHARE $
PE 1988 UNDERWAY
ROW NONE
$
0
CONST 1994
$
209
FED SHARE $
167
GA. SHARE $
42
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 132
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P, I.NO.
PROJECT DATA
--------- - --- FANNIN SR 515 FM CR 300 (PICKENS) TO UNION CL .... PICKENS/GILMER
------C-O-M--M-E-N-T-S ---------------------------Y-EA--R --------E-S-T-S --
PE NONE $
0
67080Z
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 9
PROJECT MILEAGE : 48.26 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK
FUND SOURCE: SURFACE TRANSPORT.
ROW 1994
$
CONST 1994 $
FED SHARE$
0 0
FEDERAL HIGHWAY. ADMIN FUNDS
GA. SHARE$
670800 IS AN ASSOCIATED PROJECT.
0TH SHARE$
FANNIN 670930
RESTORE MINERAL BLUFF DEPOT MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE $
0
CONST 1996 $ 128
FED SHARE$
102
GA. SHARE$
0TH SHARE$
26
l
C,0
'.
~
~
. ~
~
. ~
~
~Xil~
~ft~,~~
f);.(:.~11
t::v,;._i::~
\!(.:~--~::~
~
r.:e.~:~ :~
~
~,:~1::f
I\.'.
I~
~~ .
!t.&-..:--:,:-~'.~
f ..
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 133
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-------------------------------------------------------------! -------------------------------------------------------------------
FAYETTE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
.
3Vl022 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 3
FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY
CAPITAL 1994
$
10
MANAGER: STEVE KISH
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
FAYETTE 3V1023
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH.
CONG DIST. 3
CAPITAL 1995
$
10
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
FAYETTE 3Vl024
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH
CONG DIST. 3
CAPITAL 1996
$
10
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
FAYETTE 321950
SR 92 S/FAYETTEVILLE FM MCBRIDE RD/INMAN TO J MAYFIELD DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3,38 MANAGER: M. REYNOLDS (M)
ATLANTA TIP t FY 3
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 2313 AFTER 96
FAYETTE 321960
SR 85 $/FAYETTEVILLE FM $/BERNHARD RD TO OLD SR 92/F'VILLE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.58 MANAGER: M. REYNOLDS (M)
ATLANTA TIP t FY 6
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FAYETTE 321964
SR 85 FM SR 74 N TO BERNHARD RD/CR 126 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.30 MANAGER: M. REYNOLDS(CM)
ATLANTA TIP t FY 5
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FAYETTE 321966
SR 85@ WHITEWATER CREEK REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS (M)
ATLANTA TIP t FY 13
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1996
$
136
FED SHARE $
109
GA. SHARE $
27
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM
16-Sep-1993 Page 134
PROJECT LISTING BY COUNTY .FY 1994/FY 1996
COUNTY
DESCRIP_TION
FISCAL
COST
P.I.NO.
PROJECT DATA
F-A-Y--E-T-TE----SR---5-4-@---S-C-L--RR
------
------
-----------A--T-L-A-N-TC-AO-M.-T-MI-PE-N-fT-S-FY---1-2---------------------P-EY-E-A1-R9-9-2-----U-EN-DS-TER-SW--AY
322065 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
CONG DIST. 3
ROW NONE
$
0
PROJECT MILEAGE : .01
CONST 1996
$
663
MANAGER: M. REYNOLDS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 530
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 133
0TH SHARE $
FAYETTE 32206X
SR 34/54 FM FISCHER CROSS RDS TO SR 74 ... SEE COWETA CO UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: M. REYNOLDS
r_-
FAYETTE 32206Y
SR 54@ LINE CREEK/SEE COWETA CO UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M. REYNOLDS
coNG oisT. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 322060 IS AN ASSOCIATED PROJECT.
CONG DIST. 3
FUND "SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322063 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1995 CONST
UNDERWAY
$
0
AFTER 96
PE NONE $
0
ROW NONE $
0
CONST 1996 $-
0
FED SHARE$
GA. SHARE$
0TH SHARE$
FAYETTE 322350
SR 74 FM CROSSTOWN RD/TDK BLVD NW TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 2:15 MANAGER: M. REYNOLDS
ATLANTA TIP f FY 9 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT . . FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FAYETTE 322355
SR 74 FM SR 85 NW TO CROSSTOWN RD/TDK BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.91
MANAGER: M. REYNOLDS (M)
ATLANTA TIP f FY 9 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AFTER 96 AFTER 96
FAYETTE 322357
SR 74@ FLAT CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .25 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f FY 15 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW NONE CONST
$
10
$
,o
AFTER 96
FAYETTE 322358
SR 74 BICYCLE BRIDGE OVER SR 74 IN PEACHTREE CITY
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: N. PASSMORE (C)
ATLANTA TIP t FY 14
CONG DIST. 3
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1994
$
754
FED SHARE$
603
GA. SHARE$
48
0TH SHARE$ 103
.
~
E:LL....,
~
~
,f
12L-.J
e_l
f,.JLi
P.tU.'.~
~1~
~--L,
t~}.,'!'l,J
r.. .,_.,.,i
1'r.~~'.~1~
~
::-:-:.....;,
i.'.::-:~-~~
r.~
~
!'.""'""''""~:
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 135
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FAYETTE SR 74 AT PASCHALL ROAD IN PEACHTREE CITY
ATLANTA TIP f FY 9
PE 1994
UNDERWAY
322650 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 3
ROW 1994 $
10
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
CONST 1994 $ 231
MANAGER:
FUND SOURCE: HWY. SAFETY
FED SHARE$ 208
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
23
0TH SHARE$
FAYETTE 322660
SR 85 AT HOOD AVENUE NORTH OF FAYETTEVILLE SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER:
ATLANTA TIP f FY 18 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $ 347
FED SHARE$
312
GA. SHARE$
35
0TH SHARE$
FAYETTE SR 74 AT CRABAPPLE/PEACHTREE, TYRONE AND JENKINS ROADS 322670 . ACCELERATION/DECELERATION LN / TRAFFIC
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER:
ATLANTA TIP f FY 19 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1995 $ 173
FED SHARE$ 156
GA. SHARE$
17
0TH SHARE$
FAYETTE 331930
SR 85 CONN FM CR 168 TO SR 85; PPL FM 4.0 TO 6.0 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.I,
PROJECT MILEAGE : 3.90 MANAGER: K FULBRIGHT (M)
ATLANTA TIP f FY 1 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1995 CONST
UNDERWAY $ 2950 AFTER 96
FAYETTE 342800
SR 85 CONN FM SR 16 IN SPALDING CTY N TO CR 168 IN BROOKS RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 3.34
MANAGER: GORDON BROWN(M)
ATLANTA TIP f FY 17
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 . ROW
CONST
$
70
AFTER 96
AFTER 96
FAYETTE 37091X
CR 157@ LINE CRK & OFLW .. SEE COWETA CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: UNKNOWN
FAYETTE 370920
CR 275/SHERWOOD RD@ WHITEWATER CREEK REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER: GORDON BROWN
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
370910 rs AN ASSOCIATED PROJECT.
ATLANTA TIP f FY 11 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1994 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1994 $ 341
FED SHARE$ 273
GA. SHARE$
68
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993. Page 136
COUNTY
DESCRIPTION
FISCAL
COST
P .I.NO.
PROJECT DATA
--------------------------------------
----
-------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FAYETTE SR 54@ MORNING & CAMP CRKS; FLINT RIVER/SEE CLAYTON CO
ATLANTA TIP f CL23/FY2
PE 1986 UNDERWAY
72104X REPLACEMENT OF THE EXISTING BRIDGES{S), NO ADDED LANES,
CONG DIST. 3
.
ROW 1994
$
0
PROJECT MILEAGE : ,00
CONST 1995
$
0
MANAGER: M; REYNOLDS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
FEDERAL HIGHWAY ADMIN FUNDS 721040 IS AN ASSOCIATED PROJECT,
GA; SHARE $ 0TH SHARE $
FAYETTE 72129X
SR 85 FM SR 279/FAYETTE TO ROBERTS DR/CLAYTON
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: K FULBRIGHT
ATLANTA TIP f CL15/FY4
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721290 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1996 CONST
UNDERWAY
$
0
AFTER 96
FAYETTE 72129Y
SR 85 NBL@ CAMP CREEK/SEE CLAYTON COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .OO, - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: K FULBRIGHT
ATLANTA TIP f CL 77 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
721295 IS AN ASSOCIATED PROJECT.
PE 1992 ROW NONE CONST
,UNDERWAY
$ .
0
AFTER 96
FAYETTE 721440
SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 & CLAYTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.53 MANAGER: M. REYNOLDS (M)
ATLANTA TIP f CL41/FY10 CONG DIST. 3 .
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 72144X IS AN ASSOCIATED PROJECT.
PE 1996 ROW CONST
.$
144
AFTER 96
AFTER 96
FAYETTE 75185X
SR 314 FM SR 279 TO NORMAN DR/CLAYTON . SEE CLAYTON CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M GANNAWAY
ATLANTA TIP f CL5/FY8 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 751850 IS AN ASSOCIATED PROJECT.
PE 1996 ROW CONST
$
0
AFTER 96
AFTER 96
.
~
~
28 ~
~
l!-.'LL.1!
~!,
~UJ:-:~!C
t\.,l,,_.:'!l
!~l,r'J
,, ~
P,fj!itJ~
tt:.:~;re
t'fr~!.{tru
t>,.;;,
~
.. i.'. .:(;; I-'..,,:,'{, ..,,
, ..I~
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 137
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--. I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FLOYD TRUCK, RADIOS, SECURITY CAMERAS, CAP. MAINT., SHELTERS, ETC
6D6010 TRANSIT PROJECTS / CAPITAL
1.
CONG DIST. 7
FUNDS RECIPIENT: ROME TRANSIT SYSTEM
CAPITAL 1994
$ 1072
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
B5B
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
107
0TH SHARE$
107
FLOYD 6D601l
5 TRANSIT BUSES, VAN, CAR, CAP. MAINT., SHELTERS, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1995
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
1116 B93 112 112
FLOYD 606012
5 TRANSIT COACHES, TOW TRUCK, CAP. MAINT., SHELTERS, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
1149 919 115 115
FLOYD 6D6013
PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1994
$ ' 1330
FED SHARE $- 665
GA. SHARE $.
0TH SHARE $: 665
FLOYD 6D6014
PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
1184 213
213 11B4
FLOYD 6D6015
PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: URBAN TRANSiT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
1254 213 213
1254
FLOYD 6Vl010
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1994
$
23
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
2
GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
16-Sep-1993 Page 138
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
F-L-O-Y-D-----E-L-D-E-R-L-Y--A-N-D--D--IS-A-B-L-E-D--V--E-H-IC--L-E-S--AND
E-Q-U--IP-M-E-N-T------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
6Vl011 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 7
FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA MANAGER: STEVE KISH
CAPITAL 1995
$
24
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
19
FEDERAL TRANSIT.ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
2
FLOYD 6V1012
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES.IN FLOYD MPO AREA MANAGER: STEVE KISH
CONG DIST. 7
l
CAPITAL 1996
$
25
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
20
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
FLOYD 610980
DECK OVERLAYS FOR 115-0006, 115-0007, 123-0024, 129-0066
BRIDGES/ RECST. OR REHAB.
.
PROJECT MILEAGE : .00
MANAGER: L. SEABROOK
FLOYD 620590
SR 1/US 27 IN ROME FM 5TH AVE TO JOHN DAVENPORT DR RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .20 MANAGER: H. ASHMORE
CONG DIST. 9 & 7
FUND SOURCE: I-STATE M!\,INT. FEDERAL HIGHWAY ADMIN FUNDS 61Y980 IS AN ASSOCIATED PROJECT.
ROME TIP I L-85-11
'
CONG DIST. 7
GRIP PROJECT
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 3135 2822 314
PE 1994 $ ROW 1995 $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
36 50 1215 972 243
FLOYD 620900
SR 101/S OF ROME OVER SR 20 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .30 MANAGER: RON BRAZIEL (M)
ROME TIP f S-86-24 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1985 ROW LOCL CONST
UNDERWAY AFTER 96
FLOYD 621075
US 27@ ARMUCHEE & LITTLE ARMUCHEE CRKS/CHATTOOGA CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .06 MANAGER: RAY METTS
FLOYD 621450
W ROME BP FM CR 638 TO CR 268/INCL BR@ COOSA RVR CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 1.10 MANAGER: M GANNAWAY
ROME TIP I L-89-8
CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621070 IS AN ASSOCIATED PROJECT.
ROME TIP .I L-89-10 CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1994 $ 725
FED SHARE $ 580
GA. SHARE $
145
0TH SHARE $
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1994
$ 3952
FED SHARE $ 3162
GA. SHARE $
790
0TH SHARE $
,, "'
.
'
IH?-!dm
~
~ ~Lill! '
~
f!i'j!2!=~
~
1;;1~=
1'11'.~1~
~
~-~I\OC;<&
/i?'/,\';1~
~:i'&
r,t:~~-~~~
t~d.--:>:-~
,. ., . ,. . . ~~
~
j,:.-'>-,;--;
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION-IMPROVEMENTS PROGRAM
Page 139
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I--.N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FLOYD SR 20/100 FM SR 100 NORTH TO SR 100 SOUTH@ COOSA/INCL CLVT
PE 1992 UNDERWAY
621550 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
CONG DIST. 7
ROW
AFTER 96
PROJECT MILEAGE : 2.95
CONST
AFTER 96
MANAGER: BILL MCVEY (M)
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY AOMIN FUNDS
FLOYD 621560
SR 53 FM MP 0.54 TO 14.15 [ WON 20 CLVTS) BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 14.89 MANAGER: BILL MCVEY (M)
FLOYD 621690
SR 101 FM CR 740/CS 899 NORTH TOE 12TH ST/ROME RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.84 MANAGER: RON BRAZIEL (M)
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
44
AFTER 96
ROME TIP I S-92-25
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1994 ROW 1996 CONST
$
134
$ 1150
AFTER 96
FLOYD 621700
SR 20/NEW ROUTE/ATLANTA TO MEMPHIS HIGHWAY ... & BARTOW CO PRELIMINARY ENGINEERING/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: N PASSMORE (M)
ROME TIP f 621700 CONG DIST. 7
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE 1993 ROW NONE CONST NONE
UNDERWAY
$
0
$
0
FLOYD 631350
SR 53 AT SR 140
c
INTERSECTION IMPROVEMENT/ TRAFFIC
.
PROJECT MILEAGE : .02 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: BILL MCVEY
FLOYD 650410
DIVISION ST/ROME FM SHORTER AVE TO REDMOND RO/& REMOVE RR BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.04 MANAGER: RON BRAZIEL
FLOYD 650460
SR 101 OVER ETOWAH RIVER IN ROME REHAB. OF THE EXISTING BRIOGE(S). FRO~ 4 LANES TO 5 LANES.
PROJECT MILEAGE : .37 MANAGER: D. SMITH
ROME TIP I S-93-1
CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
ROME TIP f L-85-12 CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
ROME TIP f L-89-4 CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0
o
165 149
17
PE 1993 UNDERWAY
ROW LOCL
CONST 1994 $ 1619
FED SHARE$ 1295
GA. SHARE$
324
0TH SHARE$
PE 1993 UNDERWAY
ROW 1996 $ 405
CONST
l AFTER 96
GEORGIA DEPARTMEL:T OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 140
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FLOYD CR 641 OVER POCKET/JOHN'S CK/S POCKET CAMPGROUND
PE 1993 UNDERWAY
670760 BRIDGES/ REPLACEMENT
CONG DIST. 7
ROW NONE $
0
PROJECT MILEAGE : .00
CONST 1994
$
220
MANAGER: BILL MCVEY
FUND SOURCE: FED. LANDS
FED SHARE$ 220
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
FLOYD 670770
CR 641 OVER JOHNS/POCKET CREEK
BRIDGES/ REPLACEMENT PROJECT MILEAGE : ,15 MANAGER: BILL MCVEY
FLOYD 670820
MAYO'S BAR LOCK AND DAM RESTORATION ON COOSA RIVER MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: MEG BRYSON
CONG DIST. 7
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
ROME TIP I 670820
CONG DIST. 7
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY ROW LOCL
CONST 1994 $ 277 FED SHARE$ 277 GA. SHARE$
0TH SHARE$
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
1450
1160 710
1000
FLOYD 670830
CLASS I BIKEWAY IN ROME BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00. - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: MEG BRYSON
ROME TIP I 670830
CONG DIST. 7
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996 $ 465
FED SHARE$ 372
GA. SHARE$
0TH SHARE$
93
FLOYD 670880
BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT 16
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
.FED SHARE$
GA. SHARE$ 0TH SHARE$
0 0 1019 815 204
,, ,,,
.
~
~ ~ fll,.,_!'!!.!Ll
...
P..L,Ji!,!
~l.)fJl
~
L,.'.':;.,
~),"""-~'1
/,.(.._ ..,,
I
fE!. .;,;~
1,,-.:~,~
11.,l":.:1;_,
/~tt':~{t:f'/
j , ........... :--:
. '
f I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 14_1
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO,
PROJECT DATA
COMMENTS
YEAR
ESTS
-------------------------- --------------------------------------------------------------------------------------------------------
FORSYTH COUNTY OPERATED PUBLIC TRANSIT SERVICE
1Bl013 TRANSIT FACILITIES/ OPERATIONS
CONG DIST, 9
FUNDS RECIPIENT: FORSYTH
OPERATING 1994
$
51
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
30
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
21
FORSYTH 1B1014
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
53
r.
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
FED SHARE$
31
GA. SHARE$
0TH SHARE$
22
FORSYTH 1B1015
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1996 $
56
FUND SOURCE: RURAL TRANSIT
FED SHARE$
33
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
23
FORSYTH 1C2013
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL 1994
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
FORSYTH 1C2014
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH
CONG DIST. 9
CAPITAL-1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE$
17
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
FORSYTH 121690
SR 9 SOUTH OF CUMMING FM SR 141 N TO SR 20 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.80 MANAGER: H. ASHMORE(M)
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW
CONST
UNDERWAY AFTER 96
AFTER 96
FORSYTH 121910
RW ON 162010,162014,162018 . FM SR 371 TO ALCOVY RD RIGHTS-OF-WAY/ NEW CONSTRUCTION PROJECT MILEAGE : 25.60 - EXIST. LANES: 0 /PROPOSED LANES: 4 MANAGER: NEIL DAVIS
ATLANTA TIP f R 54 CONG DIST. 9 GRIP PROJECT FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PE NONE ROW 1989 CONST NONE
$
0
UNDERWAY
$
0
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 142
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
P. I.NO.
PROJECT DATA
---- ---------- -
---
--
FORSYTH SR 141 FM 0,6 MI NORTH OF FULTON CO LINE TO SR 9
121980 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.21
MANAGER: H. ASHMORE(M)
FISCAL
COST
-------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
PE 1992 UNDERWAY
CONG DIST. 9
ROW
AFTER 96
CONST
.AFTER 96
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
FORSYTH 122015
SR 306/369 FM SR 400 TO HALL CO LINE/INCL BR@ FOUR MILE CRK RECONSTRUCTION &- WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 9.09 MANAGER: H. ASHMORE(M)
FORSYTH sR 369@ SIX MILE & @ TWO MILE CREEKS 122017 REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .SO MANAGER: H. ASHMORE(M)
FORSYTH SR 20 FM SR 400 TO SAMPLE ROAD/CR 80 122250 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.02
MANAGER: H. ASHMORE(M)
(_
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 122012 IS AN ASSOCIATED PROJECT,
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 122015 IS AN ASSOCIATED PROJECT,
PE 1993 ROW NONE CONST
UNDERWAY
$
0
AFTER 96
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW CONST
UNDERWAY AFTER 96 AFTER 96
FORSYTH 122540
SR 400 INSTALL LOGO SIGN PANELS IN FORSYTH COUNTY
SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FORSYTH 122550
SR 9 AT SR 20 SOUTH OF CUMMING INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FORSYTH 132390
SR 306 AT SR 369 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .53 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS_
CONG DIST. 9 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST,. 9 FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1994 $
21
FED SHARE$
17
GA. SHARE$
4
0TH SHARE$
PE NONE $ ROW 1995 $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$
o
1 173 156
17
PE 1994 UNDERWAY
ROW 1994
$
4
CONST 1995 $ 310
FED SHARE$ 279
GA. SHARE$
31
0TH SHARE$
,, ,.
..,
~
. ~ ~ ,, ~~
[G~C~
,=;,= -za.=,
[,:,X:\\i
~/!'{J
121,:.}~1
~
'
f!!'i'~J
~'TifJi
it*-!i!!!i
,::!:;:~:
I'::.:. .......-.,
~-:--"-
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 143
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
FORSYTH SR 20/SR 9/CUMMING@ CS 526; & CR 87
PE NONE $
0
141605 INTERSECTION IMPROVEMENT/ TRAFFIC
CONG DIST. 9
ROW 1994 $
50
PROJECT MILEAGE : .10 - EXIST. LANES: 2 /PROPOSED LANES: 3
CONST 1994 $ 250
MANAGER: L. OWENS
FUND SOURCE: HWY. SAFETY
FED SHARE$ 225
FEDERAL HIGHWAY AOMIN FUNDS
GA. SHARE$
25
0TH SHARE$
FORSYTH 141770
SR 9@ SR 306/CHARLES PLACE IN CUMMING INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .15 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: L. OWENS
CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 150 135 15
FORSYTH 171010
BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT fl
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN
(.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE NONE $ ROW NONE $
CONST 1994 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0 1245
996 249
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 144
PROJECT LISTING BY COUNTY FY 1994/FY 1996
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-----------------------------------------------------------------------------------------------------------------------------------
FRANKLIN I-85 SIGN MOD FM DEK CL TO SC STATE LN .. GWIN/JACKS/BARR/BANK
PE NONE $
0
11044W SIGNING/ MAINTENANCE
CONG DIST. 10 & 6
ROW NONE $
0
PROJECT MILEAGE : 76.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1994 $
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
110440 IS AN ASSOCIATED PROJECT.
0TH SHARE$
FRANKLIN I-85 UPGRADE NB REST AREA f 81
110460 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER:
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
39 0
1310 1179
131
FRANKLIN SR 17(@I-85 RECST INTERCHANGE-IM]FM NCL LAVONIA-STEPHENS CL 12Y080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .00
MANAGER: UNKNOWN
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 122080 IS AN ASSOCIATED PROJECT.
PE 1994
$
0
ROW 1995 $
0
CONST 1996 $ 500
FED SHARE$ 450
GA. SHARE$
50
0TH SHARE$
FRANKLIN SR 106 AT SR 51 141760 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : .30 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS
CONG DIST. 10
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1993 UNDERWAY
CONST 1994 $ 333
FED SHARE$ 300
GA. SHARE$
33
0TH SHARE$
FRANKLIN OVERLAYS FOR 013-0013,089,0089,119-0002,119-0040,139-0004
811045 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: UNKNOWN
CONG DIST. 10 & 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 81Y045 IS AN ASSOCIATED PROJECT.
PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 1108 997 111
FRANKLIN OVERLAYS FOR SIX BRIDGES IN DIST 1,7; TO SHOW STP FUNDS 81Y045 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: UNKNOWN
I_
PE NONE $
0
CONG DIST. 10 & 4
ROW NONE $
0
CONST 1994 $ 300
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$ 240
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
60
811045 IS AN ASSOCIATED PROJECT.
0TH SHARE$
. ,, '
..
~
~ !i~:~ ~-~~~i e_~;Jffi ~ ~ ~ ; ~~r,;::~ r,.:n;,i.,~ 1:01';:,~ w-x,r,r.~ ~ f;< ..,.:, I
GEORGIA DEPARTMENT OF TRANSPORTATION
16-Sep-1993
STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
Page 145
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
FULTON TRANSIT TRAVELER DEMONSTRATION PROJECT
FISCAL
COST
------------------------.-C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
7D7010 TRANSIT PROJECTS/ CAPITAL
CONG DIST. 5 & 4
FUNDS RECIPIENT: CITY OF ATLANTA
CAPITAL 1994
$ 1875
MANAGER: STEVE KISH
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$ 1500
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
375
FULTON 707011
NORTH RAIL LINE EXTENSION - MEDICAL CTR TO NORTH SPRINGS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1994
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE.$
50332 40266
10066
FULTON 7D7012
FIXED GUIDEWAY MODERNIZATION PROGRAM TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1994
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
8494 6795
1699
FULTON 707013
PROCURE 100 BUSES AND BUS RELATED FACILITIES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5 & 4
CAPITAL 1994
$
FUND SOURCE: URBAN TRANSIT DISC.