Statewide Transportation Improvement Program, fiscal years 1994, 1995, 1996

,)GA

1100,PlP

.4

$\
-:CA

l'l'\4/llTATEWIDE

--r- -,. TRANSPORTATION

'7l -IMPROVEMENT PROGRAM

I
Georgia Department of l'ransportation

Fiscal Years
1994 1995 1996

i

i
i

I

!

-~ ~1 jj.

.

?, .

'

i

';
INTRODUCTION

The Statewide Transportation Improvement Program (STIP) is developed to comply with the provisions of the Intermodal Surface Transportation Efficiency Act of 1991 (!STEA). The STIP contains Federal Aid projects programmed for Fiscal Years 1994, 1995 and 1996. The projects have been identified through the planning process and represent transportation needs statewide.

The STIP includes Highway and Bridge, Bicycle,. Pedestrian, Transportation Enhancement, and Public Transportation (transit) projects. Phases of projects, also referred to as projectrelated activities, such as PE (Preliminary Engineering), ROW (Right of Way) and CONST (Construction) are given for highways, and capital and operating for transit. The projects are organized by County and by mode of transportation. The STIP format has been standardized with the same information for each project.

The STIP is a federal requirement for receipt of Federal Highway

Administration and Federal Transit Administration funds. The

STIP must be fiscally balanced. Projects and phases of projects

listed must only include those for which there is funding

available or for which there is a reasonable expectation of

obtaining funds. Federal funds for Fiscal Years 1994, 1995 and

I

1996 are program estimates and will not be final until after the

federal budget is approved by October 1 of each year.

The STIP is a cooperative effort between local governments, the Metropolitan Planning Organizations, lead agencies for urban area planning, and the Georgia Department of Transportation. The Metropolitan Planning Organizations, through the urban area planning process, have identified local transportation needs in urban area Transportation Improvement Programs. The urban area projects are included in the STIP along with rural area projects identified by the Department 1n consultation with local governments.

The three year Statewide Transportation Improvement Program

includes nearly 1,600 projects totaling $2.6 billion in federal,

f;

state and local funds. Projects funded with !STEA Title I

Ii

(highway) funds make up 69% of the project-related activities and. 83% of the funding; projects funded with !STEA Title III

(transit) funds represent 31% of the projects and 17% of the

expenditures.

Reconstruction and rehabilitation of existing highways and bridges account for 38% of the STIP funding. The next highest category of programmed STIP spending for highways is new construction - approximately 14% of the total. Maintenance represents 13.7% of the program.

,
D

Public Transportation projects make up 31% of projects in the STIP - capital purchases and operating ass1stance are the major activities. Public transportation program funds are used for purchase of vehicles and other transit equipment.

The Statewide Transportation Improvement Program places emphasis

on maintaining and improving the existing highways, bridges, and

public transportation equipment. The public transportation

program expenditures focuses on replacement of vehicles and

.L

other operating equipment as a means of improving public transit

operations, safety, and meeting the requirements of the

Americans with Disabilities Act. Figures 1 and 2 depict the

number of projects and amount of funding for the three year

period. Fiscal Years 1994, 1995, and 1996.

The Georgia Department of Transportation is pleased to make -this

document available. We welcome any comments on the STIP; please send your comments to:

H!

ii iii

Georgia Department of Transportation

&

Office of Planning

i

No. 2 Capitol Square

M

Atlanta, Georgia 30334

!.

i

Att: Marta V. Rosen

i

(404) 656-5725

I I

rt Ct

GLOSSARY OF ACRONYMS AND ABBREVIATIONS

FOND SOURCE:

\t

CATFX;ORIES OF FEDERAL HIGHWAY ACT (FHWA) FUNDING

CONG MIT./AIR QUAL - Congestion Mitigation/, Air Quality FED. LANDS - Federal Lands HWY. SAFETY - Highway Safety I-STATE MAINT. - Interstate Maintenance I-STATE CONST. - Interstate Construction NAT'L HIGHWAY - National Highway System OLD URBAN SYSTEM - funds allocated to Georgia before ISTEA SURFACE TRANSPORT. - Surface Transportation Program TRANS. ENHANCE. - Transportation Enhancement Assistance

CATFX;ORIES OF FEDERAL TRANSIT ACT (FTA) FUNDING

:r:

URBAN TRANSIT DISC. - Discretionary assistance

!

awarded on a competitive basis by the FTA; ADA or

CAA indicates Americans with Disabilities Act

"

project or Clean Air Act project .

URBAN TRANSIT - Urban Area assistance - can be

capital or operating funds; ADA or CAA indicates

l

Americans with Disabilities Act project or Clean

Air Act project.

ELDERLY & DISABLED - Assistance for Elderly and

Handicapped capital projects.

RURAL TRANSIT - Rural Area assistance - can be

capital or operating funds.

OTHER ACRONYMS/ ABBREVIATIONS

BR - Bridge

CONG DIST. - Congressional District

CONST - Construction

CS - City Street

CR - County Road

CWP

Construction Work Program. The

Construction Work Program includes projects in

two phases Phase I (first three years of the

Program) and Phase II (next three years of the

Program). The STIP is derived from Phase I

projects.

FED SHARE - Federal Share of the cost of the

project

FM - Indicates from

GA. SHARE - Georgia Share of the cost of the

project

HOV LANES

High Occupancy Vehicle lanes;

I

1

designated lanes used exclusively for multiple-occupancy vehicles.

INT - Intersection, usually seen as smith Road

Int Jones Street.

LGPA - Local Government Project Agreement. These

agreements outline highway and bridge project

responsibilities between the GDOT and the local

government. The status line will indicate if an

agreement has been requested, signed or refused

(a signed or refused agreement would have the

date of the transaction noted on the project

description). Most LGPA address sharing

responsibilities for right of way, utilities or

detours.

LOC SHARE - Local Share of the cost of the

project

N, S, E, W - North, South, East, West. May

also be used in combinations of NE, SW etc.

NB, SB, EB, WB - North Bound, South Bound, East

Bound,. West Bound indicating direction of

movement. Sometimes will be shown as NBL, SBL,

EBL or WBL to indicate North Bound Lane, South

Bound Lane, East Bound Lane or West Bound Lane.

B OR BU OR BUS - Business Route

...

BYP - Bypass or Circumferential Route CONN - Connector

EXT - Extension

FRNTG - Frontage

NOISE BARR. - Noise Barrier

PE - Preliminary Engineering indicates an early

phase of project development that may include

surveys, design, environment.al and other work

done in project development.

P.I. NO. - Program Item Number is unique to each

project.

PKWY -Parkway

RECST. OR REHAB.

Reconstruction or

Rehabilitation

RTL OR LTL - Right Turn Lane or Left Turn Lane

R/W or ROW - Right of Way

SR - State Route

T&S PROJECT - Traffic and Safety Project

TIP

Transportation Improvement Program

developed by the Metropolitan Planning

Organizations

UTL OR UTIL - Utilities

EIE i

I

n

-~

l~ liill1lillilll

- ' ~ -

~

~

_ 1 ~ W

~ -

~ -.,:.. .t--i

~ . 1.~t"i--1.~

\lf},o/.1!ffl .

-
1!1>"-W

-==...i. fll .

-~-= lllil

-
l"-'''-0

......_
,.;,o,cc.c-,,

f.+.,;}~'
'', '

i'~c'"...

i'' ,,.,..,-_

.

:,- ._;,

STATEWIDE FUNDS DISTRIBUTION

FEDERAL_AID PROJECTS(FY-1994-1996)

COUNT OF PROJECTS

OTHER
24

PUBLIC TRANSIT
491

NEW CONSTRUCT . 64
ENHANCEMENT 71

RECST/REHAB
410
SAFETY
207
MAINTENANCE BRIDGE REPLACEMENT 71
241

TOTAL= 1600

FIGURE 1

"
L
,1.'

~

., ... ~

~

~
'

~

~

~

f,.'f.:'!?,:?'1

Fl!,...!!!.~

., f'.f.i....~

~
;; \

~

~

~~~1

r~~--~:-:-1

. '-~.,:: ,,...,...

--~;_

~

,;



STATEWIDE FUNDS DISTRIBUTION

FEDERAL_AID PROJECTS(FY 1994-1996) -

PROJECT COST(MILLIONS $)

PUBLIC TRANSIT

OTHER

$453.1

r

$65.8

NEW CONSTRUCT

$365.2

RECST/REHAB $979.7

ENHANCEMENT $57.7
SAFETY $181.4

. MAINTENANCE BRIDGE REPLACEMENT $355.4
$149.6

TOTAL = 2.6 BILLION

FIGURE2

II

fflM

- ..... Ii!!@!! ~

-,:

,

'"

~

~ -~

~Jffl

fa!~!!

~~f!,
'

~

,~~ei

~~~ti

~

~

~'.'f:"'~
< ';-,
;.1}

i~ ,..,-~ . . .
. , "

i,.,.' ...

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 1

COUNTY

DESCRIPTION

P.I.NO.

PROJECT DATA

-------------------.

--

ALL

THREE CONVERSION VANS (2 WITH LIFTS); AND ONE STANDARD VAN

FISCAL

COST

---C-O-M--M-E-N-T-S ---------------------------Y-E-A-R --------E-S-T-S --

7C2512 TRANSIT FACILITIES/ CAPITAL

CONG DIST. 5

FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1994

$

109

FED SHARE$

87

GA. SHARE$

22

0TH SHARE$

ALL 7C2513

TWO CONVERSION VANS (1 WITH A LIFT); AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH

CONG DIST. 5

CAPITAL 1995

$

80

FUND SOURCE: RURAL TRANSIT

FED SHARE$

64

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

16

0TH SHARE$

ALL 7C2514

TWO CONVERSION VANS (1 WITH A LIFT); AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: GEORGIA DOT MANAGER: STEVE KISH

CONG DIST. 5

CAPITAL 1996

$

81

FUND SOURCE: RURAL TRANSIT

FED SHARE$

65

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

16

0TH SHARE$

ALL 8Vl010

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL 1994

$ 287

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

230

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

28

0TH SHARE$

29

ALL 8V1011

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA.
MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL 1995

$ 297

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

238

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

29

0TH SHARE$

30

ALL 8Vl012

ELDERLY AND DISABLED VEHICLES. AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL ,1996

$ 308

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

246

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

31

0TH SHARE$

31

ALL 8Vl013

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA
MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL 1994

$ 181

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

145

FEDERAL TRANSIT ADMIN.FUNDS

GA. SHARE$

18

0TH SHARE$

18

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATIO'. IMPROVEMENTS PROGRAM

Page 2

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

-FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

8Vl014 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 0

FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA

CAPITAL 1995

$ 187

MANAGER: STEVE.KISH.

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 150

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

18

0TH SHARE$

19

ALL 8Vl015

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

TRANSIT PROJECTS/ CAPITAL

FUNDS RECIPIENT: 53 RURAL COUNTIES - CENTRAL GA

MANAGER: STEVE KISH

.

CONG DIST. 0

CAPITAL 1996

$ 194

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

155

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

20

0TH SHARE$

19

ALL 8Vl016

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL, COUNTIES - SOUTH GA. MANAGER: STEVE KISH

CONG D.IST. 0

CAPITAL 1994

$ 205

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 164

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

21

0TH SHARE$

21

ALL 8Vl017

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL 1995

$ 212

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 170

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

21

0TH SHARE$

21

ALL 8Vl018

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH

CONG DIST. 0

CAPITAL 1996

$ 220

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$ 176

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

22

0TH SHARE$

22

ALL 044094

LUMP SUM MAINTENANCE FUNDED "0_4 4" FOR FY 19 9 4

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
2921 2629
292

ALL 044095

LUMP SUM MAINTENANCE FUNDED "044" FOR FY 1995

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL; STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
23862 21476
2386

- . V

...

ll_l.

..,

-

-

~ ~
,. a:- ..

~

~

~

me

~

~


. 6'!'.~.:.tli'=J

IL!~~

,.,.,~~

LK'.I:'/

1;.c "}i1

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

ALL 044096

LUMP SUM MAINTENANCE FUNDED "044" FOR FY 1996

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

. ~~~~ w;------~: ' ,

r''

16-Sep-1993 Page 3

FISCAL YEAR

COST ESTS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$ 0TH SHARE$

0
0
27778 25000
2778

ALL 04MB94

LUMP SUM BRIDGE PAINTING "04M" FOR FY 94
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $
ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
5064 4558
506

ALL 04MB95

LUMP SUM BRIDGE PAINTING "04M" FOR FY 95
BRIDGES/ MAINTENANCE .PROJECT MILEAGE : .00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0 4444 4000
444

ALL 04MB96

LUMP suM BRIDGE PAINTING "04M" FOR FY 96
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$ 0TH SHARE$

0 0 4444
4000
444

ALL 315094

LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
27293 21834
5459

ALL 315095

LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
36500 29200
7300

ALL 315096

LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
36500 29200
7300

r

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 4

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

A--LL--------LU-M--P--SU-M---IN--ST-A--LL LO-G--O -- SIGNS ON NATIONAL -- HWY SYSTEM - 1994

--- -----------------------------4---------------------------

PE NONE $

0

315L94 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONG DIST. 99

ROW NONE $

0

CONST 1994 $ 100

MANAGER:

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

80

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE.$

20

0TH SHARE$

ALL 315L95

LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYS - 1995 sIGNING / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. -99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1995 $ 100

FED SHARE$

80

GA. SHARE$

20

0TH SHARE$

ALL 315L96

LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYSTEM - 1996 SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

. ROW NONE $

0

CONST 1996 $ 100

FED SHARE$

80

GA. SHARE$

20

0TH SHARE$

ALL 315094

LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1994 LIGHTING/ MAINTENANCE PROJECT. MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1000 800 200

ALL 315095

LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1995
LIGHTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1000 800 200

ALL 315096

LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 1996
LIGHTING / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1000 800 200

ALL 33A094

LUMP SUM SAFETY "OPTIONAL" FOR FY94 UNKNOWN/ TRAFFIC PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER

CONG DIST. 99
FUND-SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1060 954 106

~
'.,:

.

. ,....._ ..~

-

II!!!!!!

- - l!l~!!!l
"

~

~

~

~

~

f~


~


~

~

~

~

~~~
.t

I~;...,:~~:'.~
41',a

!-1.,., ...... ;....,:;1

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 5

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM SAFETY "OPTIONAL" FOR FY95

PE NONE $

0

33A095 UNKNOWN/ TRAFFIC

CONG DIST, 99

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1995

$

900

MANAGER: W HESTER

FUND SOURCE: HWY. SAFETY

FED SHARE$

810

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE.$

90

0TH SHARE$

ALL 33A096

LUMP SUM SAFETY "OPTIONAL" FOR FY96 UNKNOWN/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1996

$

900

FED SHARE$

810

GA. SHARE$

90

0TH SHARE$

ALL 33C094

LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
2500 2000
500

ALL 33C095

LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F

RIDING SURFACE .REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
2500 2000
500

ALL 33C096

LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

.

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
7500 6000 1500

ALL 33CB94

LUMP SUM BRIDGE PAINTING "33C" FOR FY 94
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $
CONST 1994 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1444 1155
289

ALL 33CB95

LUMP SUM BRIDGE PAINTING "33C" FOR FY 95
BRIDGES/ MAINTENANCE PROJECT MILEAGE : ,00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA; SHARE$ 0TH SHARE$

6
0
3750 3000
750

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 6

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

.A-L-L-------L-U-M-P--S-U-M--B-R-I-D-G-E--P-A-I-N-T-I-N-G--"-3-3-C-"--F-O-R--F-Y---96------------------------------------------------------------------P-E--N-O-N-E-----$------.o

33CB96 BRIDGES/ MAINTENANCE

CONG DIST. 99.

ROW NONE $

0

PROJECT MILEAGE : .00

CONST 1996 $ 3750

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 3000

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 750

0TH SHARE$

ALL 330094

LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 94

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 11329
9063 2266

ALL 330095

LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 95

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK

0
FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1995 . $

FED SHARE$

GA. SHARE$

0TH -SHARE$

0 0 15000 12000 3000

ALL 330096

LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 96

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0. 0 11400 9120 2280

ALL 33DB94

LUMP SUM BRIDGE PAINTING "33D" FOR FY 94 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED. SHARE $

GA. SHARE$

0TH SHARE$

0 O 5000
4000 1000

ALL 33DB95

LUMP SUM BRIDGE PAINTING "33D" FOR FY 95 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE $

CONST1995 $

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 5000 4000 1000

ALL 33DB96

LUMP SUM BRIDGE PAINTING FOR "330" FOR FY 96 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE .$ ROW NONE $ CONST.1996 $
FED SHARE$
GJC SHARE $
0TH SHARE$

0 0 5000 4000
1000

...,



\a

....
f

-

l!IM

- . ll!IM '

MB

~

~

. ~ ~ ~ ~ ~tt~ ~~
GEORGIA DEPARTMENT OF TRANSPORTATION

~i~~

~c.:,Jii!.

..)>;>.~

. v,:--,;~

...;- ,:-~~--~

....... -.--~~

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 7

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM INSTALLATION OF LOGO SIGNS "1994"

PE NONE $

0

33DL94 SIGNING/ TRAFFIC

CONG DIST. 99

ROW NONE

$

0

PROJECT MILEAGE : .00 - EXIST. ~ES: 0 /PROPOSED LANES: 0

CONST 1994 $

50

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

40

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

10

0TH SHARE$

ALL 33DL95

LUMP SUM INSTALLATION OF LOGO SIGNS "1995" SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

PE NONE $

0

CONG DIST. 99

ROW NONE $

0

CONST 1995 $

50

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

40

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

10

0TH SHARE$

ALL 33DL96

LUMP SUM INSTALLATION OF LOGO SIGNS "1996"
SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER:

PE NONE $

0

CONG DIST. 99

ROW NONE $

0

CONST 1996 $

50

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

40

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

10

0TH SHARE$

ALL 33MS94

LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 94
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE $

0TH SHARE$

0 0 2177 1959 218

ALL 33MS95

LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 95
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0. -
o
3400 3060
340

ALL 33MS96

LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 96
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER

CONG DIST. 99
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE, $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 3026 2723 303

ALL 33NS94

LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 94
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: WRESTER

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$ 0TH SHARE$

0 0 1300
1170 130

GEORGIA DEPARTME"'T OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

Page 8

COUNTY

DESCRIPTION

P. I.NO.

PROJECT DATA

----- - - - ALL

LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 95

33NS95 RR XING / TRAFFIC

FISCAL

COST

COMMENTS

YEAR

ESTS

-----------------------------------------------------------------

PE NONE $

0

CONG DIST. 99 '

ROW NONE $

0

PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0

CONST 1995

$

720

MANAGER: W HESTER

FUND .SOURCE: HWY. SAFETY

FED SHARE$

648

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

72

0TH SHARE$

ALL 33NS96

LUMP SUM RRX HAZARD ELIMINATION "33N" FOR FY 96 RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 2488 2239 249

ALL 3AA094

LUMP SUM MAINT. FOR POP BET 5000-200,000 FOR FY 94

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L .- SEABROOK

.

FUND SOURGE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 12300 9840 2460

ALL 3AA095

LUMP SUM MAINT. FOR AREA POP BT SK - 200K FOR FY 1995

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 99

PROJECT MILE}\.GE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

.

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 12500 10000
2500

ALL 3AA096

LUMP SUM MAINT. FOR AREA POP BET 5,000-200,000 FOR FY 96

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST, 99

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT .

. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1996 $

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 12500 10000
2500

ALL 3AAB94

LUMP SUM BRIDGE PAINTING "3AA" FOR FY 94

BRIDGES/ MAINTENANCE

J

PROJECT MILEAGE : .00

MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

617

FED SHARE$

494

GA. SHARE$

123

0TH SHARE$

ALL 3AAB95

LUMP SUM BRIDGE PAINTING "3AA" FOR FY 95
BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE $
0TH SHARE$

0 0 6250 5000 1250

,..

,.

, ....

fflM

-

-"'

...

~


11M

l!llM

Mffl

~

I!!!!!'!!!

~
"

..11'!::tt:!liJ

~

~~;.~~

~~~

!,. .,...U

.,. . ~

I . . . . . _
--

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 9

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

LUMP SUM BRIDGE PAINTING "3AA" FOR FY 96

PE NONE $

0

3AAB96 BRIDGES/ MAINTENANCE

CONG DIST. 99

ROW NONE $

0

PROJECT MILEAGE : .00

CONST 1996 $ 6250

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT ..

FED SHARE$ 5000

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 1250

0TH SHARE$

ALL 770391

LUMP SUM -- 817 SIGNALS FOR METRO ATLANTA REMAINING FUNDING SIGNALS'/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

ATLANTA TIP t R 98
CONG DIST. 5 & 4
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

100

CONST 1996 $ 46985

FED SHARE $ 37588

GA. SHARE $ 9397

0TH SHARE $

ALL 770392

PE FOR METRO ATLANTA SIGNAL SYSTEM PROJECTS PRELIMINARY ENGINEERING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP t R 98
CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW NONE CONST NONE

UNDERWAY

$

0

$

0

ALL 811010

STUDY OF AUTOMATIC MOTOR-CARRIER CLEARANCE (ADVANTAGE I-75) SPECIAL STUDIES/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: I-STATE MA.INT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW NONE CONST NONE

$ 2200

$

0

$

0

ALL 811020

RURAL IVHS I-85, I-16, I-95, I-75 AND I-20 MISCELLANEOUS IMPROVEMENTS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ALL 870000

FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1994 SPECIAL STUDIES/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 99 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 99 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW NONE

UNDERWAY

$ .

0

CONST 1994 $ 2310

FED SHARE $ 2310

GA. SHARE $

0TH SHARE $

PE 1994 ROW NONE CONST NONE

$ 3000

$

0

$

0

ALL 870010

FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1995 SPECIAL STUDIES/ PLANNING PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 99
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW NONE CONST NONE

$ 3000

$

0

$

0

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 10

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ALL

FUNDING FOR TRANSPORTATION PLANNING STATEWIDE, FY 1996

PE 1996 $ 3000

870020 SPECIAL STUDIES/ PLANNING

CONG DIST. 99

. ROW.NONE. $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE $

0

MANAGER:

FUND SOURCE: UNKNOWN

FEDERAL HIGHWAY ADMIN FUNDS

ALL 870030
\.

RAILROAD CROSSING ADVANCE WARNING SIGNS -- STATEWIDE
RR XING / TRAFFIC PROJECT MILEAGE : .00 -.EXIST. LANES:: 0 /PROPOSED LANES: 0 MANAGER: W HESTER

CONG DIST, 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

ALL 870040

11 COVERED BRIDGES IN VARIOUS LOCATIONS STATEWIDE BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER:

, CON~ DIST, 10 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

ALL 870050

GEORGIA DEPT. OF TRANS. HIGHWAY SIGNS MANAGEMENT SYSTEM SPECIAL STUDIES/ OTHER PROJECT MILEAGE :;.00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

200

FED SHARE$ 180

GA. SHARE$

20

0TH SHARE$

PE 1994 $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

50
0
1000 800200

PE 1994

$

225

ROW NONE $

0

CONST NONE

$

0

I

,,....

. ,,

.

ia'

ffl!l1!IJ!!I

- -., ,. ~. ~

~

~

~

~

~!'.ll

a?X!~~~

~~

t............,,

/';-;-:"=:~~

~\'.~~

~

~
'

..r.:.:-:-;,:;:

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 11

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

----------------------------------------------------------------------------------------------------------------------------------

ATKINSON SR 31@ UNNAMED CRK

PE 1990 UNDERWAY

421440 REPLACEMENT OF THE EXISTING BRIDGES(S) .- NO ADDED LANES.

CONG DIST. 8

ROW 1991

UNDERWAY

PROJECT MILEAGE : .17

GRIP PROJECT

CONST

AFTER 96

MANAGER: UNKNOWN

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

(.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 12

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------------------------------------------------------------------------------------------------. ----------------------

BACON SR-32/ALMA@ HURRICANE CREEK

PE 1983 UNDERWAY

520910 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.

CONG DIST. 1

ROW NONE

$

0

PROJECT MILEAGE : .65

CONST 1995

$ 1661

MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 1329

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

332

522125 IS AN ASSOCIATED PROJECT.

0TH SHARE $

BACON 522120

SR 32, EB MP 13.4-14.6; REALIGN SR 203@ SR 32 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.20 MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1994

$

12

CONST 1995

$

450

FED SHARE $ 360

GA. SHARE $

90

0TH SHARE $

BACON 522125

SR 32/ALMA FROM SR 4/PIERCE ST NE TO CR 323 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.10 MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 520910 IS AN ASSOCIATED PROJECT.

PE 1992

UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$ 1997

FED SHARE $ 1598

GA. SHARE $

399

0TH SHARE $

IV

,- .

, ~

, .

-

l!I!!!!!!!!

-~ ::; .

~

l!l!l!ilJi!!

~

~

l!!!l!!!!!

~


!!Mi~

I!!'-*-~

rrw.:;&i"~

~

~

.c:oii!'4 '

~...,"-'~!,.':1


!',f. ~-f''t"

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 13

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BALDWIN SR 22/24 RELOC FM CR 171 EAST TO SR 22/24 SPLIT

PE 1995 $ 168

222180 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

CONG DIST. 11

ROW

AFTER 96

PROJECT MILEAGE : 3.10

CONST

AFTER 96

MANAGER: H. ASHMORE

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

BALDWIN 231280

SR 22@ SR 29/US 441 IN MILLEDGEVILLE TURN LANES/ TRAFFIC PROJECT MILEAGE : ,28 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH

BALDWIN 241670

REMOVAL OF GA RAILROAD BRIDGE OVER US 441 BUSINESS
BRIDGES/ TRAFFIC PROJECT MILEAGE : .25 MANAGER: D. GRIFFITH

BALDWIN 270950

PRESERVATION OF HISTORIC DISTRICT IN MILLEDGEVILLE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 11 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 11 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 11 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

363

FED SHARE$

327

GA, SHARE$

36

0TH SHARE$

PE 1993 UNDERWAY

ROW 1994

$

2

CONST 1995 $ 142

FED SHARE $ 128

GA. SHARE $

14

0TH SHARE $

PE 1994 $

21

ROW 1994 $

44

CONST 1995 $

74

FED SHARE$

59

GA. SHARE$

13

0TH SHARE$

28

(

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 14

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

B-A-N-K-S-----C-O-U-N-T-Y--O--PE-R-A-T-E-D--P-U--B-L-IC---T-R-A-N-S-IT---S-E-R-V-IC--E------------------------------------------------------------------------------------

1Bl003 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 10

FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

OPERATING 1994 $

22

FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

9

BANKS 1Bl004

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1995 $

22

FUND SOURCE: RURAL TRANSIT

FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

9

BANKS 1Bl005

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH

CONG DIST. 10

c-

FUND SOURCE: RURAL TRANSIT

OPERATING 1996 $

24

FED SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

10

BANKS

I-85 SIGN MOD FM DEK CL TO SC STATE LN .. GWIN/JACKS/BAR/FRANK

PE NONE $

0

11044Y SIGNING/ MAINTENANCE

CONG DIST. 10 & 6

ROW NONE $

0

PROJECT MILEAGE : 76.00 ~EXIST.LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

110440 IS AN ASSOCIATED PROJECT.

0TH SHARE$

BANKS 1310.90

SR 51 FM THE SCHOOL NE TO SR 15/US 441
TURN LANES/ TRAFFIC. PROJECT MILEAGE : .43 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS

CONG DIST. 10
FUND.SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE . $

0

ROW 1994 $

1

CONST 1995 $ 190

FED SHARE$ 171

GA. - .SHARE $

1

0TH SHARE$

18

BANKS 141630

CR 132/LULA@ NORFOLK SOUTHERN RR/ID 717648N

RR XING. / TRAFFIC

PROJECT MILEAGE : .00 - EXIST, LANES: 2 /PROPOSED LANES: 2

MANAGER: W HESTER

.

CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE ROW NONE CONST

$

0

$

0

AFTER 96

'

II

(I'(''

!J

"' ,..

l!l!l!!ll!!!!!l

-

l!!!!l!!l!!!! 11!!!!!!!!1!1
:.

~

~

~

~

~

~.,

~

~

ft.";!~~

/1:i::~j

r::::,:

.~~ '

. . 1--:-,.,........

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 15

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-BA-R-R-O-W-----I--8-5--S-I-G-N--M--OD---FM---D-E-R--C-L--T-O--S-C--S-T-A-T-E--L-N-.-.-JA--C-K-/B-A--N-K-S-/G-W-.N-/-F-R-A-N-K---------------------------------------------PE---N-O-N-E-----$------0

11044X SIGNING/ MAINTENANCE

CONG DIST. 10 & 6

ROW NONE $

0

PROJECT MILEAGE : 76,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

110440 IS AN ASSOCIATED PROJECT,

0TH SHARE$

BARROW 121730

WINDER BYP FM SR 8@ SR 11 NEARS CL NE TO SR 53@ SR 11 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 2.60 MANAGER: J. GRAYBEAL (M)

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

187

AFTER 96

BARROW 132220

SR 211@ CR 326/MP 17.5l;CR 61/MP 21.05;CHATEAU ELAN/MP 22.0 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES. PROJECT MILEAGE : 1.26 MANAGER: L. OWENS

BARROW 170725

CR 75/FRED KILCREASE RD@ APALACHEE RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,
PROJECT MILEAGE : .15 MANAGER: L. OWENS

BARROW 170726

CR 228/ROSS RD@ BEECH CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .15 MANAGER: L, OWENS

BARROW 170728

CR 72/BROWNS BRIDGE RD@ APALACHEE RIVER SW OF AUBURN REPLACEMENT OF THE EXISTING BRIDGES(S), FROM 1 TO 2 LANES.
PROJECT MILEAGE : .20 MANAGER:

CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY A!)MIN FUNDS

PE 1992 UNDERWAY

ROW 1995 $ 110

CONST 1996 $ 725

FED SHARE$

580

GA, SHARE$ 145

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1994

$

425

FED SHARE$

340

GA. SHARE$

85

0TH SHARE$

PE 1993 UNDERWAY ..

ROW LOCL

CONST 1994 $ 262

FED SHARE$

210

GA. SHARE$

52

0TH SHARE$

PE 1994 $

6

ROW LOCL

CONST 1996 $ 200

FED SHARE$

160

.GA, SHARE $

40

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 16

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY P, I.NO.

DESCRIPTION PROJECT DATA

BARTOW COUNTY OPERATED PUBLIC TRANSIT SERVICE

FISCAL

COST

-------------------------CO--M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

6B1328 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 7

FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $ 101

FED SHARE$

56

GA. SHARE$

0TH SHARE$

46

BARTOW 6B1329

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ 106

FED SHARE$

58

GA. SHARE$

0TH SHARE$

48

BARTOW 6B1330

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996

$

110

FED SHARE$

61

GA. SHARE$

0TH SHARE$

50

BARTOW 6C2328

ONE CONVERSION VAN AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1994

$

48

FUND SOURCE: RURAL TRANSIT

FED SHARE$

38

FEDERAL TRANSIT ADMIN .FUNDS

. GA. SHARE $

5

0TH SHARE$

5

BARTOW 6C2329

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW
MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS

CAPITAL 1995

$

32

FED SHARE $",

26

GA. SHARE$

3

0TH SHARE$

3

BARTOW 6C2330

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW
MANAGER: STEVE KISH

CONG.DIST. 7

CAPITAL 1996

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

2

0TH SHARE$

2

BARTOW 610950

I-75 MILL AND INLAY FM US 411/SR61 TO SR 140

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 7

PROJECT MILEAGE : 12.10 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

.

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1994 $ 2220

FED SHARE $ 1998

GA. SHARE $ 222

0TH SHARE $

....

,.,



..
' f

-

-

- -. ~

~

--

~

~

~

!).!~

Fi~.

M.'&l

~(\

j17:t,f~

c.:,:'el

~..

... f:-,.;..<.:--.-,1

i::

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 17

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O--. ------.--------P-R--O-JE-C-T---D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BARTOW I-75 AT SR 20

PE 1994' $

20

610960 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 7

ROW NONE $

0

PROJECT MILEAGE : .00

CONST 1995

$

233

MANAGER:

FUND SOURCE: I-STATE MAINT.

FED SHARE$ 210

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

23

0TH SHARE$

BARTOW 620832

SR 61@ ETOWAH RIVER REPLACEMENT OF THE EXISTING BRIDGES($). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .63 MANAGER: M. REYNOLDS

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621255 IS AN ASSOCIATED PROJECT.

PE NONE ROW 1988 CONST

$

0

UNDERWAY

AFTER 96

BARTOW 620833

SR 61@ TWO ETOWAH RIVER OVERFLOWS REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .36 MANAGER: M. REYNOLDS

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
621255 rs AN ASSOCIATED PROJECT.

PE 1996 ROW NONE CONST

$

10

$

0

AFTER 96

BARTOW 621130

SR 113: BRIDGE & APPROACHES OVER HILLS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .30 MANAGER: M GANNAWAY (M)

CONG DIST. 7
. FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621430 IS AN ASSOCIATED PROJECT .

PE 1988 ROW NONE CONST

UNDERWAY

$

0

AFTER96

BARTOW 621250

SR 61/CARTERSVILLE FM GILMER ST TO SR 20/INCL 1-WAY PAIR RECONSTRUCTION & WIDENING FROM 3 LANES TO 5 LANES. PROJECT MILEAGE : 2.30 MANAGER: BILL MCVEY (M)

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BARTOW 621255

SR 61/CARTERSVILLE FM CR 533 NORTH TO HENDERSON DRIVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES,
PROJECT MILEAGE : 2.61 MANAGER: M. REYNOLDS (M)

BARTOW 621350

SR 20 FM SR 61 TO I-75 (INCL INTCH W/SR 61 & US 41) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.47 MANAGER: BILL MCVEY (M)

CONG DIST. 7FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 620832 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST
PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96
UNDERWAY AFTER 96 AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 18

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A-----------------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BARTOW SR 113 RELOC FM PRESENT SR 113 TO CR 636;THENCE TO I-75

PE 1995

$ 184

621410 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.

coNG DIST. 7

ROW

AFTER 96

PROJECT MILEAGE : 7.70 MANAGER: M GANNAWAY (M)

FUND SOURCE: SURFACE TRANSPORT,

CONST

AFTER 96

FEDERAL HIGHWAY ADMIN FUNDS

BARTOW 621430

SR 113 FM S/TAYLORSVILLE CL NE TO CR 31/STILESBORO/POLK RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE i 4,57
MANAGER: M GANNAWAY (M)
,_.

BARTOW 621435

SR 113@ DRY CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .16 MANAGER: M GANNAWAY (M)

CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 621130 IS AN ASSOCIATED PROJECT.
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL. HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 1954 AFTER 96

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

BARTOW 621440

SR 113 FM CR 31/STILESBORO NE TO SR 61 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4,39 MANAGER: M GANNAWAY (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$ 204 AFTER 96 AFTER 96

BARTOW 621445

SR 113@ RACCOON CREEK REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .17 MANAGER: M GANNAWAY (M)

CONG_ DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW NONE CONST

UNDERWAY

$

0

.AFTER 96

BARTOW 621500

SR 140 FM 0.3 MI W/OOTHKALOOGA CRK TO SR 3/US 41 RECONSTRUCTION& WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.00 MANAGER: M GANNAWAY (M)

BARTOW 621505

SR 140@ OOTHKALOOGA CRK & CSX RR REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : .28 MANAGER: M GANNAWAY (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 621505 IS AN ASSOCIATED PROJECT.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621500.IS AN ASSOCIATED PROJECT,

PE 1992 ROW CONST
PE 1993 ROW NONE CONST

UNDERWAY AFTER 96 AFTER 96

UNDERWAY

$

0

AFTER 96

,.-

..

... ..

~

-~ ~ . ~--

~

~

~

~

~

~.,

~

~i~i~l,6,

~..:.....~~

~-',...,1/M

I<-:~

~

.- . i,,,,.-;-,,..,.,

r- . _.-._,

' -~.. .~>

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

Page 19

COUNTY

DESCRIPTION

FISCAL

COST

-P--, I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BARTOW SR 20/NEW ROUTE .. SEE FLOYD COUNTY_

PE 1993 UNDERWAY

62170X PRELIMINARY ENGINEERING/ NEW CONSTRUCTION

CONG DIST. 7

ROW NONE

$

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST NONE $

0

MANAGER: UNKNOWN

FUND SOURCE: DEMONSTRATION PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

621700 IS AN ASSOCIATED PROJECT.

BARTOW 621760

STATE ROUTE 113@ RICHLAND CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: M GANNAWAY (M)

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW NONE
CONST

UNDERWAY

$

0

AFTER 96

BARTOW 621810

US 41-SR 3 FM MP 8.01 TO MP 9.02 IN THE CITY OF CARTERSVILLE INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : 1.01 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

BARTOW 631400

SR 3/US 41 FM POSTELLE TO MLK & MOCKINGBIRD IN CARTERSVILLE

INTERSECTION IMPROVEMENT/ TRAFFIC

PROJECT MILEAGE : 1.63 - EXIST. LANES: 6 /PROPOSED LANES: 6

MANAGER: BILL MCVEY

r.

CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

BARTOW 641500

CR 459/LOCAL ACCESS RD@ CSX RAILROAD BRIDGES/ TRAFFIC PROJECT MILEAGE : .15 MANAGER: M. REYNOLDS

CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

17

ROW 1995 $

10

CONST 1996 $ 578

FED SHARE$

578

GA. SHARE$

0TH SHARE$

PE 1994 UNDERWAY

ROW LOCL

CONST 1994 $ 785

FED SHARE$ 707

GA. SHARE$

79

0TH SHARE$

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

BARTOW 641870

SR 293@ GRASSDALE RD/CR 155 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .26 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: BILL MCVEY

BARTOW 670686

CR 114@ OOTHKALOOGA CRK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .17 MANAGER: BILL MCVEY

CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1994

$

70

CONST 1994 $ 170

FED SHARE$

136

GA. SHARE$

34

0TH SHARE$

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$

246

FED SHARE$

197

GA. SHARE$

49

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 20

PROJECT LISTING. BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BARTOW CR 204/NALLEY ROAD@ LITTLE PINE LOG CREEK 7.2 MIN OF WHITE

PE 1994 $

10

670688 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.

CONG DIST, 7

ROW LOCL

PROJECT MILEAGE : .21

CONST 1996

$

387

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

310

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

77

0TH SHARE$

BARTOW 670910

CARTERSVILLE STREETSCAPE MASTER PLAN; PED/BIKE PATHS LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST, 7
FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

ROW NONE

$

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

144 0
1106 885 29 250

BARTOW 72169X

N,MARS HILL EXT FM SR 3/COBB PKWY TO I-75/BARTOW COUNTY
UNKNOWN/ UNKNOWN PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. SMITH

r .

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 721690 IS_AN ASSOCIATED PROJECT.

PE 1992 ROW CONST

UNDERWAY
AFTER 96 AFTER 96

,.

,, ,

. '

~

~

l!!!!J!!!!I! ... ~

~

~

~

~

l!'J,.~

~/L~


t!fS.:::.~

l?.'[:'i'.,.U~l

:-::.:.:;~::.:~:

~f:t,',lf

r.1'1--'~

t. ~ ' . !

..

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 21

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BEN HILL SR 90@ ALAPAHA RIVER/ALSO TURNER CO

PE 1992

UNDERWAY

431040 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.

CONG DIST. 8

ROW 1994

$

1

PROJECT MILEAGE : 1.00

CONST 1995

$

718

MANAGER: J. LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

574

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 144

0TH SHARE$

BEN HILL SR 11 FM C&G @ BUSH ST, FITZGERALD TO C&G IN ABBE' LE .. WILCOX
431360 SHOULDER WORK/ MAINTENANCE PROJECT MILEAGE : 20.06 -.EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

345

FED SHARE$

276

GA. SHARE$

69

0TH SHARE$

BEN HILL SR 107/US 319 OVER STURGEON CREEK NEAR CR 5

442580 REPLACEMENT OF THE.EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .00

.

MANAGER:

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

10

$

1

AFTER 96

BEN HILL SR 90 OVER ALAPAHA RIVER OVERFLOW 442590 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:
BEN HILL TURN LANES ON ROANOKE & MERRIMAC DRIVES IN FITZGERALD 450360 TURN LANES/ TRAFFIC
PROJECT MILEAGE : 1.60 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: J. LINDSEY

CONG DIST. 8 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8. FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

5

ROW 1995 $

1

CONST 1996

$

170

FED SHARE$

136

GA. SHARE$

34

0TH SHARE$

PE 1992 ROW LOCL CONST

UNDERWAY, AFTER 96

BEN HILL EVERGREEN CEMETERY ROAD OVER TURKEY CREEK IN FITZGERALD 450420 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER:

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

10

ROW LOCL

CONST 1996

$

180

FED SHARE$

144

GA. SHARE $

36

0TH SHARE$

,_.

j

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 22

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

B-P-IB-.B-I.-N-O--. -E-L-D-E-R-L-Y--A-N-D--D-I-SP-AR-BO-L-JEE-DC-T-V-D-EA-HT-I.CA-L-E-S--A-N-D---EQ--U-IP-M-E-N--T-----------------------------C-O-M-M-E-N-T-S-----. ----------------------Y-E-A-R--------E-S-T-S--

3V1010 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 8 & 2

FUNDS RECIPIENT: AGENCIES IN BIBB MPO AREA

CAPITAL 1994

$

38

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

30

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

BIBB 3Vl011

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPI~NT: AGENCIES IN BIBB MPO AREA MANAGER: STEVE KISH

CONG DIST. 9 & 2

CAPITAL 1995

$

39

FUND SOURCE: ELDERLY & DISABLED FUND FED -SHARE$

31

FEDERAL TRANSIT ADMIN FUNDS

.GA ..SHARE $

. 4,

0TH SHARE$

4

BIBB 3V1012

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIE IN BIBB MPO AREA, MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1996

$

41

FUND. SOURCE: ELDERLY & DISABLED FUND FED SHARE$

33

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

BIBB 310713

I-75@ I-16; SOU RR; ARKWRIGHT RD; US 23 & SR 87; & 31Y713 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 7.30. MANAGER: H. ASHMORE

MACON TIP f. 230-TSM. CONG DIST. ~
FUND SOURCE: NAT'L HIGHWAY FEDERAL .HIGHWAY ADMIN FUNDS 31Y710 IS AN ASSOCIATED PROJECT.

PE NONE $

ROW NONE $

CONST 1994

$;

FED SHARE $

GA. SHARE $.

0TH SHARE$

0 0 23_85
1908 477

BIBB 310980

I-16@ SR 540 INCL I-16 ML BR@ SAL RR; 1 STREAM & 1 RIVER INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .97 - EXIST, LANES: 2 /PROPOSED LANES: 4
MANAGER: BEN BUCHAN (M)

MACON TIP f llOC-MC CONG DIST. 8 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1987 UNDERWAY ROW 1989 UNDERWAY CONST 1996 $ 22468-
FED SHARE$ 17974 GA. SHARE $. 4494 0TH SHARE$

BIBB 311000

I-16 IN MACON, INTER MOD@ SR 11, SR 22, SR 87

INTERCHANGE/ RECST. OR REHAB.

PROJECT MILEAGE : 1.27 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: BEN BUCHAN (M)

.

MACON TIP I 180-MC
CONG DIST. 2:
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1987 UNDERWAY

ROW 1995 $ 320

CONST 1996 $ 3800

FED SHARE$ 3420

GA .. SHARE $

380

0TH SHARE$

BIBB 311130

I-16@ OCMULGEE RVR,WALNUT CK, OCMULGEE RVR OFLW
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : . 01 MANAGER: BEN BUCHAN (M)

MACON TIP I 270-TSM
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDER.AL HIGHWAY ADMIN FUNDS

PE 1986 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

\

'' "'.!Ii

. p

i

l!!J!!l!!!I!!!

I!!'.!!!'!!!!!!

. ~

~

~

~

ffi!!I~~

~

,. ~ .

~

B3!?::.t,

~as

~':'-"~~;

f:.~. .~:~~

I~~

,.:..;"""';'

. '

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 23

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

B--IB-B-------I--7-5/-M--A-C-O-N--F-M--P-I-E-R-C-E--A-V--E--EA--ST---TO---I--1-6------------------------------M-A-C-O-N--T-I-P--I--2-20-1-\.--M--C---------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

311400 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

CONG DIST. 8 & 2

ROW

AFTER 96

PROJECT MILEAGE : 1.62

CONST

AFTER 96

MANAGER: BEN BUCHAN (M)

FOND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

BIBB

I-16 FM I-75 EAST TO SR 11

, .

311410 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

PROJECT MILEAGE : 1.10

MANAGER: BEN BUCHAN (M)

MACON TIP I 190A-MC
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BIBB 311415

I-16/MACON FM SR 11 EAST TO SR 87 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10 MANAGER: BEN BUCHAN (M)

MACON TIP I 190B-MC
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

BIBB 311460

I-75@ HARTLEY BRIDGE RD/CR 740 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: BEN BUCHAN (M)

MACON TIP I 271-TSM
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 5000 AFTER 96

BIBB 311530

I-16@ SR 87/MLK JR. BLVD IN MACON LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E.. LAWS

BIBB 311560

I-75@ HARDEMAN AVE & FORSYTH ST
TURN LANES/ TRAFFIC PROJECT MILEAGE :- .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BEN BUCHAN

MACON TIP I 250-TSM
CONG DIST. 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP I 220-TSM
CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

70

FED SHARE$

56

GA. SHAAE $

14

0TH SHARE$

PE 1994 ROW 1995 CONST

UNDERWAY

$

190

AFTER 96

BIBB 311580

I-475 AT REST AREA I 19, MP 7.7NB
REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1994

$ 2000

FED SHARE $ 1800

GA. SHARE $

200

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 24

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

B--IB-B-------I--4-7-5--F-M---I--7-5--T-O--S--R--1-9-/-U-S---41-/-M-O-N-R-O-E-----------------------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY

311590 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CO~G DIST. 8 & 3

ROW NONE

$

0

PROJECT MILEAGE : 14.00 - EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: ..L. SEABROOK

.

FUND SOURCE: I-STATE MAINT.

CONST _1994

$ 10000

FED SHARE $ 9000

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1000

0TH SHARE $.

BIBB 311685

I-16 FM JCT I-75 TO TWIGGS/BLECKLEY CL ... TWIGGS

I

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 8

PROJECT MILEAGE: 31.70 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

.

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

31168Z IS AN ASSOCIATED PROJECT.

PE NONE

$

ROW 1994

$

CONST 1994

$

FED SHARE$

,GA. SHARE$

0TH SHARE_ $

0
0 4706 4235
471

BIBB 311750

NAPIER AVE OVER I-75; I-75 OVER RAMP TO SR 87 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:

CONG DIST.8 & 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE_
ROW _CONST

AFTER 96 .AFTER 96
AFTER 96

BIBB 31Y713

I-75@ 5 BRIDGES; FOR IM FUNDING; SEE 310713 UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

BIBB 322000

SR 87/RIVERSIDE DR/MACON FM HALL RD TO NORTHSIDE DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.29 MANAGER: ~EN BUCHAN

BIBB 322005

SR 87/RIVERSIDE DR/MACON@ SABBATH CREEK REHAB. OF-THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .50 MANAGER: BEN BUCHAN

BIBB 33175X

HOUSTON RD FM SR 11 TO WALDEN/SARDIS;SEE HOUSTON SPLIT UA $ UNKNOWN/ UNKNOWN PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 230-MC CONG DIST. 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL_HIGHWAY ADMIN FUNDS 322005 IS AN ASSOCIATED PROJECT.
MACON TIP f 230-MC(2) CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322000 IS AN ASSOCIATED PROJECT.
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 331750 IS AN ASSOCIATED PROJECT,

PE NONE $

0

ROW NONE

$

0

CONST 1994

$: 300

FED SHARE$

270

GA .. SHARE $.

30

0TH SHARE$

PE 1992 UNDERWAY

ROW 1995 $ 250

CONST 1996 $ 3023

FED SHARE $ 2418

. GA. SHARE $

605

0TH SHARE $

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1996

$

320

FED SHARE $

256

GA. SHARE $

64

0TH SHARE $

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1996

$

277

FED SHARE $

222

GA. SHARE $

55

0TH SHARE $

,,
~~

'4

..

,, '

-: ~

!'!!ffllJ!9

~ !R!!'8 Mi.@ ~ ~ ~ ~ ~ ~i.511 ~:l!tM = ~ " t:.~~~ tee:-'::::, ~~}-';l ~.;..~

,-,.

"'

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 25

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------ BIBB

MILLERFIELD RD/MACON@ JEFFERSONVILLE RD

. MACON T-IP---f --10-0---T-S-M----------------------PE---N-O-N-E-----$------0

342080 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 2

ROW LOCL

PROJECT MILEAGE : .40 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

156

MANAGER: GORDON BROWN

FUND SOURCE: HWY. SAFETY

FED SHARE$

140

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

16

0TH SHARE$

BIBB 350520

WID & RCST FOREST HILL RD IN MACON: OVERLOOK TO WIMBISH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .60 MANAGER: D. CHURCH

MACON TIP f 141-MC CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1984 ROW LOCL CONST

UNDERWAY AFTER 96

BIBB 350560

SR 247/US 41/PIO NONO AVE FM I-75 TO SR 49/US 129/ RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 1.30 MANAGER: D. CHURCH

r.

BIBB 350760

CR 79/NORTHSIDE DR FM FOREST HILL RD TO SR 87/& SABBATH CK RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.60 MANAGER: BEN BUCHAN

BIBB 350820

HOUSTON RD FM WALDEN/SARDIS CH RDS TO SR 11 MINOR WIDEN & RESURF / RECST. OR REHAB. PROJECT MILEAGE : 3.20 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: GORDON BROWN(M)

BIBB 350960

SR 74 FM W/I-475 TO COLUMBUS RD (INCL BR OVER I-475) TURN LANES/ TRAFFIC PROJECT MILEAGE : 1.30 - EXIST. LANES: 4 /PROPOSED LANES:. 5 MANAGER: BEN BUCHAN (M)

BIBB 371030

LANDSCAPING OF CIVIC SQUARE FOR PARK IN MACON LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOS.ED LANES: 0
MANAGER: CORA COOK

MACON TIP f 140-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 210-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 150-MC CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MACON TIP f 339-MC CONG DIST. 8 & 2 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 & 8 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1987

UNDERWAY

CONST 1994

$ 2928

FED SHARE $ 2342

GA. SHARE $ 586

0TH SHARE $

PE 1992 UNDERWAY ROW LOCL
CONST 1995. $ 3811 FED SHARE$ 3049 GA. SHARE$ 762 0TH SHARE$

PE 1992

UNDERWAY

ROW LOCL

CONST 1995

$

757

FED SHARE$

606

GA. SHARE$ 151

0TH SHARE$

PE 1994

$

ROW 1995 $

CONST 1996 $

FED SHARE$

GA. SHARE$

0TH SHARE$

35 110 1238 1114 124

PE 1994

$

60

ROW LOCL

CONST 1994

$

240

FED SHARE$

192

GA. SHARE$

12

0TH SHARE$

60

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 26

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

B-P-IB-.BI-.-N-O--. -C-A--LL--B-O-X--ES--O-N--P-IR--1O-6-JE-CF-RT-O-MD-A--TSRA---8-7-/B-I-B-B---TO---I--9-5-/C-H-A--T-H-A-M-----------------------C-O-M-M-E-N-T-S--------------------------P-EY-E-A1-R9-9-4-----$-E-S-T-S-.-so

811030 MISCELLANEOUS IMPROVEMENTS/ NEW CONSTRUCTION

CONG DIST. 1 & 8

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1996 $ 1660

MANAGER:

.

FUND SOURCE: I-STATE MAINT.

FED SHARE$ 1494

FEDERAL HIGHWAY ADMIN FUNDS

GA, SHARE$ 166

0TH SHARE$

r_-

,.

1)1

<!'

,

'

. '

l!!!l!!!!!l

~

. l!Jll!!l!!!I ~

~

~

~

~

!,I..~

~~

= ~

~!Kt~

\~~~~-=~

w.~::~t,

~!~l

~~

'1

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

P~ge 27

COUNTY

DESCRIPTION

FISCAL

COST

-- P.I.NO.

PROJECT DATA

B--L-EC--K-LEY---CO-U--N-TY---O-P-ER-A--T-ED- -- PUBLIC--T-R-A-N-S-I-T--S-ERVICE

COMMENTS

YEAR

ESTS

----------------------------------------------------------------------------------

2B1088 TRANSIT FACILITIES/ OPERATIONS

. CONG DIST. 8

FUNDSRECIPIENT: BLECKLEY

OPERATING 1994 $

52

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

31

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

21

BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 281089 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1995 $

54

FUND SOURCE: RURAL TRANSIT

FED SHARE$

32

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

22

BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 281090 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY .
MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1996 $

58

FUND SOURCE: RURAL TRANSIT

FED SHARE$

34

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

24

BLECKLEY ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
2C2088 TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH

CONG DIST. 8

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2089 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH

CONG DIST. 8

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2090 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH

CONG DIST. 8

FUND SOURCE: RURAL TRANSIT

CAPITAL 1996

$

21

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

BLECKLEY I-16 FROM TWIGGS CL TO US 441 IN LAURENS COUNTY

210670 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 8

PROJECT MILEAGE : 18.30 - EXIST. LANES: 4 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
4517 4065
452

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

P.age 28

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

B-L-E-C-K-L-E-Y--S-R--8-7-/-U-S--2-3--I-N--C-O-C-H--R-A-N-@----SO-U-T-H-E-R-N--R-R----------------------------------------------------'

-----~

----------Y-E-A-R---------E-S-T-S-PE 1985 UNDERWAY

221130 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 8

ROW 1988 UNDERWAY

PROJECT MILEAGE : .30

'CONST 1994

$ 1006

MANAGER: D. GRIFF~TH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

805

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

201

0TH SHARE $

BLECKLEY SR 87 FM S/BOLLINGER CRK-BLECKLEY TO SR 96/TWIGGS 222070 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 7. 79 MANAGER: H. ASHMORE(M)

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL "IGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST.

UNDERWAY

$

116

AFTER 96

BLECKLEY SR 87 FM SR 257 NW TO THE COCHRAN BYPASS 222360 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.50 MANAGER: H. ASHMORE(M)

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$

90

AFTER 96

AFTER 96

BLECKLEY SR 112: OVER BOLLINGER CREEK 242160 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:

CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW CONST

$

10

AFTER 96

AFTER 96

.,
!Y

r_-
"

,, r

j

,. F!M!e !!Ml! ,, ~ ~ ~ ~ ffi!!1 ~ e.ftttl ~~ ~ ~ ~~~ ~?~"."~ !'.!r1;-!~.i ~

. ,,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-.1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 29

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

BRANTLEY CR 11@ HILL CREEK WEST OF HOBOKEN

--------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PE 1994

$

4

570925 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 1

ROW LOCL

PROJECT MILEAGE : .20

CONST 1996

$

144

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

115

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

29

0TH SHARE$

! .

I

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE-TRANSPORTATION IMPROVEMENTS PROGRAM

Page 30

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BROOKS SR 94 FM W/CR 276 TOE OF WITHLACOOCHEE RVR/LOWNDES

PE 1992

UNDERWAY

421720 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 2

ROW

AFTER 96

PROJECT MILEAGE : 1.60

CONST

AFTER 96

MANAGER: K FULBRIGHT (M)

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

421722 IS AN ASSOCIATED PROJECT.

BROOKS 421722

SR 94@ LITTLE RVR;WITHLACOOCHEE RVR & OFLW/ALSO LOWNDES REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .20 MANAGER: K FULBRIGHT (M)

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421720 IS AN ASSOCIATED PROJECT.

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

BROOKS 421990

SR 94 NB FM MP 10.0-11.S;SB MP 1.6-3.1 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.00 MANAGER: J. LINDSEY

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

864

FED SHARE$

691

GA. SHARE$

173

0TH SHARE$

BROOKS 431420

SR 33 AT NORFOLK SOUTHERN RAILROAD ... f723472U
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER

CONG DIST. 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

75

FED SHARE$

68

GA. SHARE$

8

0TH SHARE$

BROOKS 470870

CR 268@ PISCOLA CREEK & OVERFLOW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .53 MANAGER: J. LINDSEY

CONG DIST. 2
FUND-SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 853 FED SHARE$ 682 GA. SHARE$ 171 0TH SHARE$

<.

:;

,.

1,

,, '

f

~

-~ ~

,, im= ~

~


~

~ ~

~ ~

~[~~

~ ==

~~m;~

!,tt:t:~

~~

tti~-:~

f:?;<:-~

Vi''-'~

el .....))

. ,, f'\',.,......

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 31

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
BRYAN COUNTY OPERATED PUBLIC TRANSIT SERVICE

5Bl283 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 1

FUNDS RECIPIENT: BRYAN

OPERATING 1994

$

86

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

50

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

36

BRYAN 5B1284

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH

BRYAN 5B1285

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH

CONG DIST. 1

OPERATING 1995 $

91

FUND SOURCE: RURAL TRANSIT

FED SHARE$

53

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

38

CONG DIST. 1

OPERATING 1996

$

95

FUND SOURCE: RURAL TRANSIT

FED SHARE$

55

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

40

BRYAN 5C2283

ONE CONVERSION VAN AND ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH

CONG DIST. 1

CAPITAL 1994

$

48

FUND SOURCE: RURAL TRANSIT

FED SHARE$

38

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

OTH.SHARE $

5

BRYAN 5C2284

ONE CONVERSION VAN WITH LIFT
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH

CONG DIST. 1

CAPITAL 1995

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

BRYAN 51115X

I-95 FM JERICO RVR TO US 17 ... SEE LIBERTY CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 511150 IS AN ASSOCIATED PROJECT.

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

BRYAN 511190

I-16 WIDEN 10 BRIDGES@ MP 138.3; 145.9; 146.6; 146.8; 147.2 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

ROW NONE $

CONST 1996 $

FED SHARE$

GA. SHARE$

0TH SHARE$

75
0
2502 2252
250

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 32

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BRYAN I-95 FM 0.8 MIS/US 17 TO OGEECHEE RVR; FOR IM FUNDS

PE NONE $

0

51Y020 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

CONG DIST. 1

ROW NONE $

0

PROJECT MILEAGE : 5.40

CONST 1994 $ 5761

MANAGER:

FUND SOURCE: I-STATE MAINT.

FED SHARE$ 5185

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

576

0TH SHARE$

BRYAN 521750

US 17/RICHMOND HILL FM SR 144 N TO S/OGEECHEE RIVER OFLW BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.90
MANAGER: M. REYNOLDS

CONG DIST. 1
FUND SOURCE: SURF~CE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995 $ 3732

FED SHARE$ 2986

GA. SHARE$

746

0TH SHARE$

BRYAN 521755

WIDEN & NEW BRIDGE ON US 17@ OGEECHEE RIVER/ALSO CHATHAM CO
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : . 3 6 MANAGER: M.. REYNOLDS

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521750 IS AN ASSOCIATED PROJECT.

PE 1991

UNDERWAY

ROW NONE $

0

,CONST 1995 $ 2388

FED SHARE$ 1910

GA. SHARE$ 478

0TH SHARE$

BRYAN 521758

US 17/RICHMOND HILL FM 4-LN N/I-95 TON/SR 144/INCL NEW BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: M. REYNOLDS

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1992 UNDERWAY

CONST 1994

$ 5193

FED SHARE$ 4154

GA. SHARE$ 1039

0TH SHARE$

BRYAN 531130

SR 144/RICHMOND HILL FM CR 100 NW TO SR 25/US 17 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.57 MANAGER: M. REYNOLDS

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1990 UNDERWAY

CONST 1994

$ 1899

FED SHARE$ 1519

GA. SHARE$

369

0TH SHARE$

11

BRYAN 531220

SR 144/RICHMOND HILL FM WEST RAMPS@ I-95 EAST TO US 17 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.41 MANAGER: M; REYNOLDS

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994 $ 1643

FED SHARE$ 1314

GA. SHARE$

329

0TH SHARE$

BRYAN 532360

CR 90 FM OCEAN HWY/SR 25 TO PARK HILL RD/CR 154 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 6.92 MANAGER: PETE BLQ~KER.

CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$ 2525

FED SHARE$ 2020

GA. SHARE$

505

0TH SHARE$

.,, .~

,4

,, r

.....

~

I!!!!!!!!! ~ ~ ~ ~ ffif.!!fj !!JSJ,.6 ~ ~:S"i;~ ~~ ~!~~ ~;<-
~

~. .. f ... -,,..,

r?'""'~

~
I l

.r,-:,"'! '

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 33

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--

BRYAN CR 90/BELFAST-KELLER RO OVER TIVOLI RIVER

PE 1994

$

9

532410 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.

CONG DIST. 1

ROW LOCL

PROJECT MILEAGE : .20

CONST 1995

$

341

MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

273

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

68

0TH SHARE$

-----------:----------------------------------,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 34

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
BULLOCH COUNTY OPERATED PUBLIC TRANSIT SERVICE

5Bl518 TRANSIT PROJECTS/ OPERATIONS

CONG DIST. 1

FUNDS RECIPIENT: BULLOCH COUNTY

OPERATING 1994 $

41

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

17

BULLOCH 5Bl519

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH

CONG DIST, 1

OPERATING 1995 $

44

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

18

BULLOCH 5Bl520

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH

CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996 $ - 46

FED SHARE$

27

GA. SHARE$

0TH SHARE$

19

BULLOCH 5C2518

ONE CONVERSION VAN WITH LIFT AND MOBILE RADIO TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH

(_

BULLOCH 5C2519

TWO CONVERSION VANS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: BULLOCH COUNTY
MANAGER: STEVE KISH

CONG DIST. 1

FUND SOURCE: RURAL TRANSIT

CAPITAL 1994

$

32

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

CONG DIST, 1

CAPITAL 1995

$

58

FUND SOURCE: RURAL TRANSIT

FED SHARE$

46

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

6

0TH SHARE$

6

BULLOCH 521170

SR 73 W@ LOWER LOTTS CRK 6 MI SOUTH OF STATESBORO
BRIDGES/ OTHER PROJECT MILEAGE : ,30 MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

1

CONST 1995 $

96

FED SHARE $

77

GA. SHARE $

19

0TH SHARE $

BULLOCH 521270

SR 67 FM CR 248/585 NORTH TO 5-LN SECTION RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.40 MANAGER: PETE BLOCKER

CONG DIST. 1
"FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 521275 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1995 CONST

UNDERWAY

$

80

AFTER 96

_,, .,., -

,,

rf r

r

P!!!!!!

~

~ ~
-~

~

-

~

~

~

~

~

r,t'::"i;,"

,.~ . ...,j

~- -~.~. .. --!~,

~

~1 Ltt ,

;-.--,.,....,, iJ..

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-,1993 Page 35

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.
--- -----------------

PROJECT--D--A-T-A--

- -----------------------------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

BULLOCH SR 67@ LITTLE LOTTS CRK

PE 1992

UNDERWAY

521275 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 1

ROW NONE

$

0

PROJECT MILEAGE : . 20

CONST

AFTER 96

MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

521270 IS AN ASSOCIATED PROJECT.

BULLOCH 521800

SR 73/US 301 FM PACKING HOUSE RD TO NORTH OF CR 445 & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.45 MANAGER: RAY METTS (M)

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BULLOCH 521970

SR 26/STATESBORO FM BRANNEN RD/CR 482 TO SR 67/73/US 301 RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : 1.72 MANAGER: RAY METTS (C/M)

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BULLOCH 522230

OLD SR 46@ BLACK CREEK 1.2 MI W/SR 26 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : . 50 MANAGER: PETE BLOCKER

BULLOCH 522465

SR 67@ WOODCOCK BRANCH & ZETTEROWER BRANCH REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .12 MANAGER: RAY METTS (C/M)

BULLOCH SR 26/US 80 EB MP 7.1-8.2; WB MP 8.1-9.3

522470 ADDITION OF A PASSING LANE.

PROJECT MILEAGE : 2.30

MANAGER: PETE BLOCKER

.

CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 522460 IS AN ASSOCIATED PROJECT.
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW LOCL

CONST 1995 $ 859

FED SHARE$

687

GA. SHARE$

172

0TH SHARE$

PE 1992 ROW NONE CONST

UNDERWAY.

$

0

AFTER 96

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BULLOCH 522740

SR 26 AT ZETTERTOWER/STOCKYARD
TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

9

ROW 1995 $

10

CONST 1996

$

289

FED SHARE$ 289

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 36

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BULLOCH OLD.SR 46@ LITTLE LOTTS CK 11 MI SOUTH OF STATESBORO

PE 1993 UNDERWAY

531270 . REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 1

ROW LOCL

PROJECT MILEAGE : .22 MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

CONST 1995

$

575

.FED SHARE$

460

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

115

0TH SHARE$

BULLOCH 541950

SR 46 OVER LUKE SWAMP BRANCH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

10

$

1

AFTER 96

BULLOCH 550500

BRANNEN ST/GENTILLY RD FM SR 67 TO SR 26 INCL BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE: 1.47 MANAGER: PETE BLOCKER

BULLOCH 571010

STATESBORO GREENWAYS; LANDSCAPING.

BICYCLE/PED. FACILITY./ ENHANCEMENT
PROJECT MILEAGE : ;oo - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

r_

CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1996 $ 847

FED SHARE$

678

GA. SHARE$

169

0TH SHARE$

PE LOCL

ROW 1994 $ 200

CONST 1994 $ 175

FED SHARE$ 140

GA. SHARE$

40

0TH SHARE$

75

~ V

.,

,., r



~

@m

~ ,, ~ '

~

~

~

~

~

~
&

~

~~

m 1:--:,:.:

~~~7,}

f~.'.L'tl.~

. ~ '

..f- ..., . <

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 37

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--, ---------------P-R-O--JE-C-T--D--A-T-~----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

BURKE COUNTY OPERATED PUBLIC TRANSIT SERVICE

2Bl093 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 11

FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH

OPERATING 1994 $

68

FUND SOURCE: RURAL TRANSIT

FED SHARE$

40

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

28

BURKE 2Bl094

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS. RECIPIENT: BURKE MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1995 $

71

FUND SOURCE: RURAL TRANSIT

FED SHARE$

42

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

29

BURKE 2Bl095

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1996 $

75

FUND SOURCE: RURAL TRANSIT

FED SHARE$

44

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

31

BURKE 2C2093

TWO STANDARD VANS
TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH.

CONG DIST. 11

CAPITAL 1994

$

40

FUND SOURCE: RURAL TRANSIT

FED SHARE$

32

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

BURKE 2C2094

TWO STANDARD VANS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH

CONG DIST. 11

CAPITAL 1995

$

40

FUND SOURCE: RURAL TRANSIT

FED SHARE $'

32 ,

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

BURKE 2C2095

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH

CONG DIST. 11

.

FUND SOURCE: RURAL TRANSIT

CAPITAL 1996

$

32

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $.

3

0TH SHARE$

3

BURKE 221190

SR 56/SR 80 NE OF WAYNESBORO@ BRIER CRK BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .46 MANAGER: D. GRIFFITH

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$ 1876

FED SHARE $ 1501

GA. SHARE $ 375

0TH SHARE $

. \

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 38

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

p. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

B-U-R-K-E-----S-R---56--A-T--N-O--R-FO-L-K---SO-U-T-H-E-R-N---R-A-IL-R-O-A-D----.-f6-2-0-2-9-0-W-------------------------------------------------------------P-E--N-O-N-E-----$----- 0

231500 RR XING / TRAFFIC

CONG DIST. 11

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

75

MANAGER: W HESTER

FUND SOURCE: HWY. SAFETY

FED SHARE$

68

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

8

0TH SHARE$

BURKE 270840

79 AC MUNDY WETLAND MITIGATION SITE N/SR 56;NE OF WAYNESBORO RIGHTS-OF-WAY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1994

$

125

CONST 1994

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

BURKE 270890

BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 2
BRIDGE PAINTING /MAINTENANCE PROJECT MILEAGE: .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE $

.CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 1314 1051 263

(.

') .-i



1,.

,r .-

(4 t,

~

@I!!!!

!!!Ml i ~ .},.,.,,'-' !I

~

~

fflii

-,:,;,.c~

~

~
If

~~ J:::.'t:::~
j

;;:.:;:::=.~

/'.,;:~

~

~ i:,----\,.

~ , . . .

j ~-.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 39.

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ----------------P-R-O-J-E-C-T--D-A-T-A----------------------------~r-. ----------------C-O-M-M--EN-T-S----------------------------Y-EA-R---------E-S-T-S--

BUTTS I-75@ SR 36 FM 0.5 MI SW/I-75 TO 0.55 MI NE/I-75[& BRIDGE]

PE 1992 UNDERWAY

311380 INTERCHANGE/ RECST. OR REHAB.

CONG DIST. 11

ROW 1994 $ 10181

PROJECT MILEAGE : 1.10 - EXIST. LANES: 2 /PROPOSED LANES: 4

CONST 1995 $ 4577

MANAGER: H. ASHMORE (C)

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 4119

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

458

0TH SHARE $

BUTTS 311730

I-75: SR 36 OVER I-75 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

10

ROW 1995 $

1

CONST 1996 $ 169

FED SHARE$

152

GA. SHARE$

17

0TH SHARE$

BUTTS 322440

SR 36/JACKSON FM SR 16 TO CR 289/STARK RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .63 MANAGER: H. ASHMORE(M)

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

BUTTS 332060

SR 16 OVER YELLOW WATER CREEK REPLACEMENT OF THE EXISTING BRIDGES{$). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

11

ROW 1995 $

1

CONST 1996 $ 741

FED SHARE$ 593

GA. SHARE$ 148

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 40

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-5PA-1M-1. -0ID.-7ENN0-O--. -R-I-E-9C-5O--N-FSM-TR-FU-L-CA-T-IOL-NI-NP-RE-&O-WT-JEO-ICD-T-HE-NA-DIRN-ARG-TIA-E-FTR-TO-SM-BL4UL-FAF-N-R-ES-D-/I-TNO-C--L6--BL-AR-N@-E-S-C.-ROOKED---R-V-R------C-O.NG--D-C-IO-SM-T-M. -E-1N-T-S-------------------------RO-PWE-Y-EA-N1R-O9-N9-E3-----U$-NE-DS-ETR-SW--AY0

PROJECT MILEAGE : 7. 22

l .

CONST 1995

$ 21500

MANAGER: J. GRAYBEAL

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$ 17200

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 4300

0TH SHARE$

CAMDEN 511075

I-95@ ST MARY'S RIVER@ FLA STATE LINE; & 51Y075 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .23 MANAGER: J. GRAYBEAL

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 4775

FED SHARE$ 3820

GA. SHARE$ 1438

0TH SHARE$ 2393

CAMDEN 511080

I-95 FM HARRIETT'S BLUFF RD TO SR 25 SPUR RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 6.72 MANAGER: J. GRAYBEAL

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 10608

FED SHARE$ 8486

GA. SHARE$ 2122

0TH SHARE$

CAMDEN 511082

I-95 FM SR 25 SPUR TO CR 138/INCL BRIDGES RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 8.44 MANAGER: J. GRAYBEAL

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 21000

FED SHARE$ 16800

GA. SHARE $ 4200

0TH SHARE$

CAMDEN 511084

I-95 FM.CR 138 TO US 17/GLYNN & BR@ L SATILLA RVR .. GLYNN RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 6.76 MANAGER: J, GRAYBEAL .

BRUNSWICK TIP f BATS93-11 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL.HIGHWAY ADMIN FUNDS

PE 1996 $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

231 0
11568 9254 2314

CAMDEN 51Y075

I-95@ ST. MARY'S RV@ FLA STATE LINE; FOR IM$; SEE 511075 UNKNOWN/ UNKNOWN PROJECT MILEAGE .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 250

FED SHARE$ 225

GA. SHARE$

25

0TH SHARE$

CAMDEN 521910

SR 40@ SATURDAY PARK SC AND FOOD LION PLAZA INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE : .50 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 233

FED SHARE$- 186

GA. SHARE$

47

0TH SHARE $

,,.. ,.
l ~,

., .

' .

.... "'',''

~

l@B

. M@J ~ ,

~

~

= ~

~.!W!!

~L!fj

_,_1--- ~,w.iifj

..

"

.. ,;.,.;.-.,.,.,V,..<..,J..

:,~~r~~~:-:.::1

/,:~'.:~

Mt~

.. ,.~ ~,.:~-~

t:" .....,.._,
...

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 41

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-----------------------------------------------------------------------------------------------------------------------------------

CAMDEN SR 40 FM W/CR 61 TO SR 25/US 17

PE 1992 UNDERWAY

522080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 1

ROW

AFTER 96

PROJECT MILEAGE : 3.86

CONST

AFTER 96

MANAGER: H. ASHMORE (CM)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

CAMDEN 522690

SR 25/US 17 BRIDGE OVER ST. MARY'S RIVER /FLA STATE LINE
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .oo
MANAGER:

CAMDEN 532480

SR 40@ CR 81 AND I-95 SB ON/OFF RAMPS IN KINGSLAND INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .14 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: PETE BLOCKER

CAMDEN 571000

A STUDY OF BIKE/PEDESTRIAN PATHS IN COASTAL GEORGIA
PRELIMINARY ENGINEERING/ ENHANCEMENT PROJECT MILEAGE : .00 --EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

ROW 1994 $

CONST 1995 $

FED SHARE$

GA. SHARE$

0TH SHARE$

300 5
3050 2440
610

PE NONE

$

0

ROW LOCL

CONST 1994

$

275

FED SHARE$ 248

GA. SHARE$

28

0TH SHARE$

PE 1994

$

125

ROW NONE $

0

CONST NONE $

0

CAMDEN 571050

WOODBINE WATERFRONT BOARDWALK, SIDEWALK AND LANDSCAPING BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

59

ROW NONE $

0

CONST 1994

$

609

FED SHARE$

487

GA. SHARE$

12

0TH SHARE$

134

r

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P. I.NO.

PROJECT DATA

COMMENTS

C-A--R-R-O-LL---C-S--8-2-4-/S-T-E-W--A-R-T--S-T-/-C-A-R-R-O-L-L-T-O--N-@--C--U-R-T-IS---C-R-E-EK-------------------------------- - ---------- --

350660 REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.

CONG DIST. 7

PROJECT MILEAGE : .25

MANAGER: BILL MCVEY

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 42

FISCAL

COST

YEAR

,. ESTS

-------------------------

PE1991

UNDERWAY

ROW LOCL

CONST 1996 $ 303

FED SHARE$ 242

GA. SHARE$

61

0TH SHARE$

CARROLL 370725

CR 813/STATE LINE RD@ BIG INDIAN CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .30 MANAGER: BILL MCVEY

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1990 UNDERWAY

ROW LOCL

CONST 1994 $ 391

FED SHARE$ 313

GA. SHARE$

78

0TH SHARE$

CARROLL 61091X

I-20 SAFETY IMPROVEMENTS FRM ALA STATE LINE TO SR 61/HARALSO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

CARROLL 621770

CARROLLTON BYP FM 4-LN S/US 27A TO 4-LN ON BANKHEAD/& CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.78 MANAGER: RON BRAZIEL

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994 $

10

CONST 1995 $ 5865

FED SHARE$ 4692

GA. SHARE $. 1173

0TH SHARE$

CARROLL 621820

SR 61 AT SR 166 SIGNALS/ TRAFFIC PROJECT MILEAGE .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

7

ROW NONE $

0

CONST 1996 $ 231

FED SHARE$ 231

GA. SHARE $.

0TH SHARE$

CARROLL 631300

SR 166 FM CR 828/141 TO 4-LN/CARROLLTON .. INCL BRIDGES RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 5.65 MANAGER: RON BRAZIEL (M)

CONG DIST. 7
FUND. SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 5607 AFTER 96

CARROLL 631310

SR 166 FM SR 100/BOWOEN TO CR 828 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.10 MANAGER: RON BRAZIEL (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY
AFTER 96 AFTER 96

....

~ ..

'('l

fFM

~ ~

. ~ ~ "'

~

~
~!lll

~ ~

rn~

~,~

. . h~ ~i;'t,$\

~:~-:,::~

. ~;::\ ,~

I::;::~

i:r;;.,.;:~,

.. r.""l'~

..., .

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 43

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

-------------------------------------------------------------------------

------C-O-M-M-E-N-T-S---------------------------Y-E-A-R---------E-S-T-S--

CARROLL SR 16/US 27ALT FM SR 166 SE TOW OF STRIPLING CHAP RD/CR 24

PE 1993 UNDERWAY

631320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 7

ROW 1994 $ 1531

PROJECT MILEAGE : 1.65

CONST 1995 $ 4282

MANAGER: RON, BRAZIEL (C)

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 3426

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

856

0TH SHARE $

CARROLL 641890

N CARROLLTON BYP/SR 166 CONN. FM SR 1 TO SR 166 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.90 MANAGER: RON BRAZIEL (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY
$ 2429 AFTER 96

CARROLL 641910

SR 100 NB MP 5.30-4.28: SB MP 6.9-7.89 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.01 MANAGER: BILL MCVEY (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

26

$ 164

AFTER 96

CARROLL 650480

SR 8/US 78 AT CS 777 TURN LANES/ TRAFFIC PROJECT MILEAGE : .23 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER:

CARROLL 662500

CR 217/PLOWSHARE RD@ BUCK CREEK

.

1.

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .25

MANAGER: BILL MCVEY

CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $ ROW NONE $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

9 0 . 165
149 17

PE 1992

UNDERWAY

ROW LOCL

CONST 1994 $ 339

FED SHARE$ 271

GA. SHARE$

68

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 44

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
CATOOSA COUNTY OPERATED PUBLIC TRANSIT SERVICE

6B1333 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: CATOOSA

OPERATING 1994

$

88

MANAGER: STEVE KISH

FU~D SOURCE: RURAL TRANSIT

FED SHARE$

47

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

42

CATOOSA 6B1334

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

92

FUND SOURCE: RURAL TRANSIT

FED SHARE$

49

FEDERAL TRANSIT ADMIN FUNDS

"GA. SHARE$

0TH SHARE$

43

CATOOSA 6B1335

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS . FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1996 $

96

FUND SOURCE: RURAL TRANSIT

FED SHARE$

51

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

45

CATOOSA 6C2333

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1994

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL-TRANSIT ADMIN FUNDS

GA .. SHARE $

2

0TH SHARE$

2

CATOOSA 6C2334

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA
MANAGER: STEVE KISH

CATOOSA 6C2335

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA
MANAGER: STEVE KISH

CONG DIST. 9 FUND SOURCE:. RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
I
CONG DIST.. 9 FUND. SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CATOOSA 610720

PE & DESIGN FOR REPLACING WELCOME CENTER/I-75 N. OF RINGGOLD
REST AREA/ NEW CONSTRUCTION PROJECT MILEAGE : .50 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RON BRAZIEL (C)

CHATTANOOGA TIP I 3 CONG DIST. 9
FUND.SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

CAPITAL 1995

$

29

FED SHARE $ 23

GA. SHARE$

3

0TH SHARE$

3

CAPITAL 1996

$

32

FED SHARE$

26

GA. SHARE $

3

0TH SHARE$

3

PE 1991 UNDERWAY

ROW 1994

$

672

CONST 1995 $ 4080

FED SHARE$ 3672

GA. SHARE$ 592

0TH SHARE $ 1000

.,
).r

' .

'll'

~

~

-~ .I le

~

~

ffl~

tt-~~

~IS

.. ~~~ ~,,

tl~!:.::~

~1.~~- ..... !J

t~._~,~~t~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

CATOOSA 610730

I-75@ SR 3/US 41

INTERCHANGE/ RECST. OR REHAB.

PROJECT MILEAGE : .35 - EXIST. LANES: 2 /PROPOSED LANES: 4

MANAGER: EX PASSMORE

.

CHATTANOOGA TIP t 10
CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

..~~i

.,,,"'

16-Sep-1993 Page 45

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1995

$

120

CONST l!:196

$ 1720

FED SHARE $ 1548

GA. SHARE $

172

0TH SHARE $

CATOOSA 610800

I-75 FM SR 2 TO SR 146 RECONSTRUCTION & WIDENING FROM 6 LANES TO 8 LANES. PROJECT MILEAGE : 3.63 MANAGER: RAY METTS (M)

CHATTANOOGA TIP t 14
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY
$ 1000 AFTER 96

CATOOSA 610810

I-75 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 6 LANES TO 8 LANES. PROJECT MILEAGE : 1.42 MANAGER: RAY METTS (M)

CHATTANOOGA TIP t 13
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY
$ 500 AFTER 96

CATOOSA 610820

CO SYSTEM FM S/SCRUGGS RD TO TENNESSEE STATE LINE CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : .50 MANAGER: RAY METTS (M)

CHATTANOOGA TIP t 12
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS

PE 1993 ROW 1995 CONST

UNDERWAY $ 107 AFTER 96

CATOOSA 621530

SR 151 FM RELOC. HACKETT RD/CR 179 N TO I-75@ RINGGOLD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.30 MANAGER: M GANNAWAY (M)

CATOOSA 631190

CR 382/0LD SR 2@ SOUTH CHICKAMAUGA CRK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES.
PROJECT MILEAGE : .18 MANAGER: BILL MCVEY

CATOOSA 631420

SR 2/SR 3/US 41 AT SPARKS STREET IN NASHVILLE TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CHATTANOOGA TIP t 16
CONG DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y530 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP t 8
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 200 AFTER 96

PE 1992 UNDERWAY

ROW LOCL

CONST 1995 $ 303

FED SHARE$ 242

GA. SHARE$

61

0TH SHARE$

PE NONE $

0

ROW 1994

$

10

CONST 1995

$

173

FED SHARE$

173

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 46

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-AP-T-.IO-.O-N-SOA--. -S-R---1-4-6-@--C-R---80-;-P@R--O-CJE-SC--Tj4--7D-A;-T-A@--C-R--5-8-/--C-R--5-8-@---S-R--2--------------------C-H-A-T-T-A.NCOO-OM-G-MA-E-NT-TSI-P--f--6---------------------P-EY-E-A1-R9-9-3-----U-NE-DS-ETR-SW--AY

641820 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 9

ROW 1994

$

100

PROJECT MILEAGE: .SO - EXIST. LANES: 2 /PROPOSED LANES: 2

CONST 1995

$

741

MANAGER: BILL MCVEY

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $

593

FEDERAL HIGHWAY AOMIN FUNDS

GA. SHARE $

148

0TH SHARE $

CATOOSA 650430

SR 3/US 41 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .66 MANAGER: M GANNAWAY (M)

CHATTANOOGA TIP f 11 CONG oisT. 9
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY AOMIN FUNDS

PE 1993
ROW 1995 CONST

UNDERWAY
$ 165 AFTER 96

CATOOSA 650440

SR 146/CLOUO SPRINGS RO FM LAKEVIEW OR TO I-75/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2. 34 MANAGER: M GANNAWAY (M)

CATOOSA 650500

SR 146 AT CROSS STREET SIGNALS/ TRAFFIC: PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

CATOOSA 65Y440

SR 146/CLOUO SPGS RO FM LAKEVIEW TO I-75&BRIOGE .. SEE 650440 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES .. PROJECT MILEAGE: 2.34 MANAGER: M GANNAWAY

CATOOSA CR 259 SOUTH OF RINGGOLD@ LITTLE CHICKAMAUGA CRR 670710 .REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
.PROJECT MILEAGE : .14
MANAGER: BILL MCVEY

CHATTANOOGA TIP f 15 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS 65Y440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP f 22 CONG [?IST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
CHATTANOOGA TIP f 15 CONG DIST. 9
FUND SOURCE: OLD URBAN SYSTEM FEDERAL HIGHWAY AOMIN FUNDS 650440 IS AN ASSOCIATED PROJECT.
CHATTANOOGA TIP f 5 CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 1167 AFTER 96

PE NONE $

0

ROW NONE $

0

CONST 1996 $

64

_FED SHARE$

51

GA. SHARE$

_13

0TH SHARE$

PE 1992 ROW 1996 CONST.

UNDERWAY $ 544 AFTER 96

PE 1994 ROW LOCL CONST

$ 180 AFTER 96

CATOOSA 670810

HISTORIC RAIL DEPOT RESTORATION IN RINGGOLD MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY AOMIN FUNDS

PE LOCL

ROW LOCL

CONST 1995 $

35

FED SHARE$

28

GA. SHARE$

0TH SHARE$

7

,.

,,

I

...._ ,

~

~

~ ~


~

~

~

~

~

~

. ~..:Ji!

m:*\

'./.~....:-,--.,

~:;.-::.-::,::~

\:,';,:.,>~

.~~ r-~- "\-

'

'Ji.

COUNTY P,I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

16-Sep-1993 Page 47

FISCAL YEAR

COST ESTS

CHARLTON SR 852/FOLKSTON FM CR 138 NE ON NEW LOC TO US 1 521900 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .50 MANAGER: PETE BLOCKER

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1994

$

256

CONST 1994

$ 1925

FED SHARE $ 1540

GA. SHARE $ 385

0TH SHARE $

CHARLTON SR 40 E/FOLKSTON: l)EB MP 1.65-3.0; 2)WB MP 3.7-5.2
522350 ADDITION OF A PASSIN.G LANE. PROJECT MILEAGE : 2.85 MANAGER: PETE BLOCKER

CO.NG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY

$

13

AFTER 96

CHARLTON SR 94@ ST MARYS RIVER AT FLORIDA STATE LINE 531300 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : 1.00 MANAGER: PETE BLOCKER

CONG DIST. l
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY

$

2

AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LIS~ING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 48

COUNTY P, I.NO.
CHATHAM

DESCRIPTION PROJECT DATA
PROPERTY PURCHASE, FACILITY

EXP.,

8 TRANSIT COACHES,

FISCAL

COST

E-T-C-. ---------------C-OM--M-E-N-T-S---------------------------Y-E-A-R-.-------E-S-T-S--

505010 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 1 & 11

FUNDS RECIPIENT: CHATHAM AREA TRANSIT MANAGER: STEVE KISH

CAPITAL 1994

$ 4000

FUND SOURCE: URBAN TRANSIT DISC,

FED SHARE$ 3200

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$ 400

0TH SHARE$ 400

CHATHAM 505011

CAP. MAINT., VEHICLES, FACILTIY IMP., TOOLS, FURNITURE;. ETC
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH

<
CONG DIST .. l & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1995

$ 340

FED SHARE$

272

GA. SHARE$

34

0TH SHARE$

34

CHATHAM .505012

CAP. MAINT., VEHICLES, TOOLS, EQUIPMENT, FACILITY IMP., ETC TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH.

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$

370

FED SHARE$ 296

GA. SHARE$

37

0TH SHARE$

37

CHATHAM 505014

PUBLIC TRANSIT SERVICE FOR SAVANNAH AND CHATHAM COUNTY

TRANSIT PROJECTS/ OPERATIONS

.

FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM

MANAGER: STEVE KISH

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

3473
1702 1702 3473

CHATHAM 505015

PUBLIC TRANSIT SERVICE FOR SAVANNAH AND. CHATHAM COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $
FED SHARE$ GA. SHARE $ 0TH SHARE$

4536 907 907
4536

CHATHAM 505016

PUBLIC TRANSIT SERVICE FOR SAVANNAH AND CHATHAM COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST, 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

4266 896 896
4266

CHATHAM 5V1010

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH

CONG DIST. 1 & 11

CAPITAL 1994

$

54

FUND.SOURCE: ELDERLY & QISABLED FUND FED SHARE$

43

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

6

0TH SHARE$

5

- ,.,

...

~

-

1!!18

~

~

~

~

~

~

~

~
fl

~-:::t::.::;:.i

/!t~:\:~:;t . i~:::::~~~~~

1;;.:1.~~

... .,,. riit>.l~i t-~-:-~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 49

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

(_ .

FISCAL

COST

-P--, -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
CHATHAM ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

5Vl011 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 1 & 11

FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA

CAPITAL 1995

$

56

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $.

45

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

0TH SHARE$

6

CHATHAM 5Vl012

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH

CONG DIST. 1 & 11

CAPITAL 1996

$

58

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

46

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

6

0TH SHARE$

6

CHATHAM 510936

SR 404/US 17A LANDSCAPING FOR TALMADGE MEMORIAL BRIDGE LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : ,00 ~EXIST.LANES: 0 /PROPOSED LANES: 0 MANAGER: E. LAWS

SAVANNAH TIP f 94-H-10 CONG DIST. 1 & 11
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

. 0

CONST 1994

$

750

FED SHARE$

600

GA. SHARE $

150

0TH SHARE$

CHATHAM 511010

I-95 TRUCK RAMP & WEIGH STATION JUST SOUTH/ SC LINE & 51Y010 WEIGH STATION/ RECST. OR REHAB. PROJECT MILEAGE : .38 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: RON BRAZIEL (C)

SAVANNAH TIP f 94-H-3 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1994

$

161

CONST 1994

$ 3212

FED SHARE$ 2570

GA. SHARE$

642

0TH SHARE$

CHATHAM 51102X

I-95 FM 0.8 MIS/US 17-BRYAN CO TO OGEECHEE.RVR/INCL RVR BRS

RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

PROJECT MILEAGE : .00

.

MANAGER: H. ASHMORE

CONG DIST, 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 511020 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1994

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

CHATHAM 511060

I-95@ CR 984/JIMMY DELOACH PKWY
INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. CHURCH (M)

SAVANNAH TIP f 91-H-8
CONG DIST, 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL
CONST 1996 $ 6000 FED SHARE$ 4800 GA. SHARE$ 1200 0TH SHARE$

CHATHAM 511160

I-95 FM N/I-16 IN CHATHAM THRU EFFINGHAM TO S.C. SL;& 51Yl60 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 13.10 MANAGER: \. REYNOLDS

SAVANNAH TIP f 93-H-2 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL.HIGHWAY ADMIN FUNDS

PE 1994

$

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

396
0 23897 19118
4779

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 50

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-H-A-T-H-A-M----I--1-6--A-T--M-P--1--6-5-.1-,--1--6-4-.0--, --1-6-3-.-2-, --1-6-2-.-3-, --A-ND---I--5-1-6---IN-T-E-R-C-H-A-N--G-E------S-A-V-A-N-N-A-H--T-I-P--I--9-4--H----2-------------------PE---1-9-9-5-----$-----1-10

511180 BRIDGES/ RECST. OR REHAB.

CO~G DIST. 1

ROW NONE

$

0

PROJECT MILEAGE : .00

CONST

AFTER 96

MANAGER:

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 511200

I-16 FM I-95 TO END OF I-16@ MP 166.3 & LIGHT,SGN,WALLS GUARDRAIL/ TRAFFIC PROJECT MFLEAGE : 9.20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

'

CHATHAM 51Y010

I-95 TRUCK RAMP AND WEIGH STAT.; FOR IM FUND; SEE 511010
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CHATHAM 51Yl60

I-95 FM N/I~16 TO SC STATE LINE; FOR IM$; SEE 511160 UNKNOWN/ UNKNOWN . PROJECT MILEAGE .00 - EXIST.' LANES: 0 /PROPOSED LANES: 0
MANAGER:

CHATHAM 521495

SR 204/ABERCORN.ST@ SOUTHWEST BYP INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : 1.14 ._EXIST.LANES: 0 /PROPOSED LANES: 0
MANAGER: G. ROSS

CHATHAM 521505

HARRY S.TRUMAN PKY/PH IV FM WHITFIELD AVE TO MONTGOMERY X-RD CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.90 MANAGER: G. ROSS

SAVANNAH TIP I 94-H-1
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP f 91-H-14
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP I 87-H-10
CONG DIST. 1 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1994 $ 1234

FED SHARE$ 1234

GA. SHARE$

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994

$

350

FED SHARE$ 315

GA. SHARE$

35

0TH SHARE$

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$
0TH SHARE$

0 0 2500 2250 250

PE 1992

'
UNDERWAY

ROW LOCL

CONST 1996 $ 7297

FED SHARE$ 5838

GA. SHARE$ 1459

0TH SHARE$

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

CHATHAM 521508

HARRY S.TRUMAN PKY/PH III FM MONTGOMERY X-RD TO DERENNE AVE CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: G. ROSS

SAVANNAH TIP I 87-H-9,
CONG DIST._l & 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

,,

.....,

l!B

~

~

~

~

~

~

~

~

~

~~
I

~:~:.:;:,:~

~;-:~~:. ,,:

[(~:~?::~::!

1:.:x-n~~

~~'-A~ ~ ,,.

. . /:...., ...;,~~ ~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 51

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--, ---------------P-R-O--JE-C-T---D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHATHAM HARRY S TRUMAN PKWY FM S OF HENRY-ANDERSON TO PRESIDENT ST

SAVANNAH TIP f 87-H-8

PE 1992 UNDERWAY

521680 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

CONG DIST. 11

ROW LOCL

PROJECT MILEAGE : 1.70

CONST 1994

$ 29701

MANAGER: G. ROSS

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$ 23761

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 5940

0TH SHARE$

CHATHAM 52175X

US 17@ OGEECHEE RIVER/SEE BRYAN COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: M. REYNOLDS

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521755 IS AN ASSOCIATED PROJECT.

PE 1991 UNDERWAY

ROW NONE

$

0

CONST 1995 $

0

FED SHARE $

GA. SHARE $

0TH SHARE $

CHATHAM 521770

SR 26 FM BRYANWOOD RD TOW/BULL RIV INCLD BIKE LANE & BRIDGE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.94 MANAGER: G. ROSS

SAVANNAH TIP f 87-H-34 CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 52Y770 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1996 CONST

UNDERWAY $ 200 AFTER 96

CHATHAM 521780

SR 26/GARDEN CITY FM CR 704 TO SR 25/US 17;INCL CLVT EXT
TURN LANES/ TRAFFIC PROJECT MILEAGE : .70 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D, SMITH

SAVANNAH TIP f 90-H-8 CONG DIST. l
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$

100

CONST 1994

$

826

FED SHARE$

743

GA. SHARE$

83

0TH SHARE$

CHATHAM 521855

SR 26 FM 4-LN E/LYNES PKWY TO VICTORY DR/CS 188 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.38 MANAGER: G. ROSS

SAVANNAH TIP f 87-H-18b CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 5620 FED SHARE$ 4496 GA. SHARE$ 1686 0TH SHARE$ 2810

CHATHAM 521860

SR 25 FM 4-LN N/SR 204 NE TO SR 307(INCL PARALLEL BRIDGE) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.40 MANAGER: G, ROSS (C)

SAVANNAH TIP t 90-H-6
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL CONST 1996 $ 5976
FED SHARE$ 4781 GA. SHARE$ 1195 0TH SHARE$

CHATHAM 521865

SR 25/US 17 FM OGEECHEE RVR OFLW TO S/SR 204(& NEW BR) RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.75 MANAGER: G. ROSS (C)

SAVANNAH TIP t 90-H-7
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521867 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW LOCL

CONST 1996 $ 4281

FED SHARE$ 3425

GA. SHARE$

856

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 52

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-HP-A-,IT-.H-NA-OM--. --SR---2-5/-U-S---17-/-0-C-EP-AR-NO--JE-HC-WT-Y-@-D-A-OT-AG-E-E-C-HEE---R-IV-E-R--O--V-ER-F-L-O-W--------------------SA-V-A-N-N--AC-HO-M-TM-IE-PN-T-St--9-0--H----7-------------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY

521867 REHAB. OF THE EXISTING BRIDGE(S), FROM 2 LANES TO 4 LANES,

CONG DIST, 1

ROW LOCL

PROJECT MILEAGE : .05_ MANAGER: G. ROSS (C)

FUND SOURCE: BRIDGE PROGRAM

CONST 1996

$

445

FED SHARE$

356

FEDERAL HIGHWAY. ADMIN FUNDS

GA. SHARE$

89

521865 IS AN ASSOCIATED PROJECT.

0TH SHARE$

CHATHAM 52217X

SR 17/US 80 FM SR 27 TO CHERRY ST IN BLOOMINGDALE/EFFINGHAM RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.67 MANAGER: UNKNOWN
r:-

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 522170 IS AN ASSOCIATED PROJECT.

PE 1994 ROW 1996 CONST

$

0

$

0

AFTER 96

CHATHAM 522490

SR 26/US80 FM W OF BULL RIVER TOE OF LAZARETTO CRK/INCL BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 5.16 MANAGER: G. ROSS

SAVANNAH TIP f 93-H-3 CONG"DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL_HIGHWAY_ADM~N FUNDS

PE 1995 ROW CONST

$ 602 AFTER 96 AFTER 96

CHATHAM 522610

SR-25/US-17 OVER THE SAVANNAH RIVER REPLACEMENT OF THE EXISTING BRIDGES (S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER:.

SAVANNAH TIP f.90-H-6 CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM F~QERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW C9NST

$ 150 AFTER 96 AFTER 96

CHATHAM 522670

RE-ROUTING SR 25/US 17 IN PORT WENTWORTH TO SR 30 RECONSTRUCTION & WIDENING, NO LANE ADDITION PROPOSED. PROJECT MILEAGE : ,94 MANAGER:

SAVANNAH TIP t 92-H-5
CON.G DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW CONST

$ , 15
AFTER 96 AFTER 96

CHATHAM 52Y770

SR 26 FM BRYANWOOD RD TO BULL RIV (SHOWN FOR BIKE FUNDS 33B) BICYCLE/PED. FACILITY/ RECST. OR REHAB. PROJECT MILEAGE: 1.94 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: G. BOULINEAU

CHATHAM 531260

SR 204 EB FM MP 2.0-3.2;WB MP 3.7-4.7 SE OF MELDRIM ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.20 MANAGER: PETE BLOCKER

SAVANNAH TIP f. 87-H-34 CONG DIST. 1
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS 521770 IS AN ASSOCIATED PROJECT.
SAVANNAH TIP f 92-H-7 CONG DIST. 1 .
FUND SOURCE: SURFACE TRANSPORT. FEDERAL..HIGHWAY ADMIN FUNDS

PE NONE ROW 1996 CONST

$

0

$

0

AFTER_ 96

PE 1992 UNDERWAY

ROW 1995 $

14

CONST 1996

$

660

FED SHARE $

528

GA. SHARE $ 132

0TH SHARE $

,.,,,,

. . ,

~

s.9

~

~ ~
'

~

~

JtfJ~

~

~

it:@.(:~s

~~.,

~~

,(t.''"'.'\:-!.

r,':,'.'7;~

,~~:~

.. ~. ~~

r::~:-.~~

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 53.

COUNTY

DESCRIPTION

FISCAL

COST

C-HP-A-. T-IH.-NA-MO--. -S-R--2-0-4-/A--B-E-R-C-O-R-NP-R-OS-T-JE-.C-T@--DE-IA-S-THA-E-N-H-O-W--ER---IN---SA-V-A-N-N-A-H----------------------SA-V-A-N--N-AC-HO-M-TM-IE-PN-T-Sf--9-4--R----5-------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--O

532510 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 1

ROW 1994 $ 300

PROJECT MILEAGE : .00 - EXIST. LANES: 7 /PROPOSED LANES: 8

CONST 1995 $ 133

MANAGER: PETE BLOCKER-

FUND SOURCE: RWY. SAFETY

FED SHARE$ 120

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

13

0TH SHARE$

CHATHAM 541900

SR 25 ALT/US 17@ GRAHAM ST IN SAVANNAH INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .40 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: PETE BLOCKER

SAVANNAH TIP f 93-H-1 CONG DIST. 11
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1994 $ 350

FED SHARE$ 315

GA. SHARE$

35

0TH SHARE$

CHATHAM 550460

STEPHENSON AVE/SAVANNAH FM ABERCORN ST TO WATERS AVE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .85 MANAGER: BILL MOSKAL (C)

SAVANNAH TIP f 89-H-5 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL
ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

2181 1745
436

CHATHAM DIAMOND CSWY FM FERGUSON AVE TO MCWHORTER DR 550550 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

'.

PROJECT MILEAGE : 3.20

MANAGER: G. ROSS

SAVANNAH TIP f 92-H-3 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 1810 AFTER 96

CHATHAM 550560

WHITFIELD AVE FM OLD WHITFIELD RD TO FERGUSON AVE/ SAVANNAH RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: G. ROSS

SAVANNAH TIP f 87-R-39 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

CHATHAM 570830

SURVEILLANCE AND MONITORING SYSTEM IN SAVANNAH CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. PROJECT MILEAGE : .00 MANAGER:

CHATHAM 570850

MCQUEENS ISLAND ABANDONED RAILROAD MULTIPURPOSE TRAIL BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: KEITH GOLDEN

SAVANNAH TIP f 94-H-6 CONG DIST. 11
FUND SOURCE: RWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
SAVANNAH TIP f 94-H-8 CONG DIST. 1 & 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1995

$

578

FED SHARE $ 520

GA. SHARE $

58

0TH SHARE $

PE LOCL

ROW LOCL

CONST 1995

$

440

FED SHARE$ 352

GA. SHARE$

0TH SHARE$

88

GEORGIA.DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 54

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-H-A-T-H-A-M---E-X--T-. -O-F--R-.--M-C-C-O-R-K-L-E--S-R--B-I-K-E-W-A-Y--O-N--W--IL-M--IN-G-T-O-N---IS-L-A-N-D----------------SA-V-A-N-N-A-H---T-I-P--f--9-4--H----9-------------------P-E--L-O-C-L-----------

570860 BICYCLE/PED. FACILITY/ ENHANCEMENT

CONG DIST. 11

ROW LOCL

PROJECT MILEAGE : . 00 - EXIST. LANES: .0 /PROPOSED LANES: 0

CONST 1996

$

110

MANAGER: KEITH GOLDEN

FUND SOURCE: TRANS. ENHANCE.

FED SHARE$

88

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

22

CHATHAM 570870

LANDSCAPING & RAILROAD YARDS & SHOPS/VISITOR CENTER REHAB MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - ,EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: KEITH GOLDEN

SAVANNAH TIP f 94-H~7 CONG DIST. 1 & 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL
ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

2450 1960
490

CHATHAM 570880

OLYMPIC LANDSCAPING IN SAVANNAH, 1994 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW LOCL

CONST 1994

$

625

FED SHARE$ 500

GA. SHARE$ 125

0TH SHARE$

CHATHAM 570890

OLYMPIC LANDSCAPING IN SAVANNAH, 1995 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

<.

CHATHAM 570900

OLYMPIC LANDSCAPING IN SAVANNAH, 1996

LANDSCAPING/ ENHANCEMENT
PROJECT MILEAGE : :oo - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

'

SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP f 94-H-4 CONG DIST. 11 & 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 $ ROW LOCL
CONST 1995 $ FED SHARE$ GA. SHARE$
0TH SHARE$

25
1094 875 219

PE 1996 $ ROWLOCL
CONST 1996 $ FED SHARE$ GA. SHARE $
0TH SHARE$

25
1094 875 219

CHATHAM 570910

BRIDGE PAINTING PROJECT FOR FY 1994 - DISTRICT 5/SEE 57Y910
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : 00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

O

ROW NONE' $

0

CONST 1994 $ 392

FED S~ARE $ 353

GA. SHARE$

39

0TH SHARE$

CHATHAM 570960

BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT f5/GLYNN BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 .- EXIST. LANES: 0 /PROPOSED LANES: 0. MANAGER: UNKNOWN .

CONG DIST. 1
FUND. SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROWNONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE $ ..

0 - O
1206 965 241

. ,

&

~

. li!IM ,,~

~

~

,ffiM

8kJi~~j

ftfiU.t,:,

~~.OE~

~l'.:JL~


~:.~:f.i,l

~

(iC?~~

f!!;~~..z~

ti:'i' ;:~ti

..'~~;; ,

.,.'~-

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

CHATHAM 57Y910

BRIDGE PAINT.ING PROJECT FOR FY 1994 - DISTRICT 5/SEE 570910
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

16-Sep-1993 Page 55

FISCAL YEAR

COST ESTS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

336

FED SHARE$

269

GA. SHARE$

67

0TH SHARE$

CHATHAM 81103X

CALL BOXES ON I-16 FROM SR 87/BIBB TO I-95/CHATHAM .. SEE BIBB
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 1 & 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

('

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 56

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA.

---------------------------------------

--------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE

3B1203 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 2

FUNDS RECIPIENT: CHATTAHOOCHEE

OPERATING 1994 $

40

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

22

GA. SHARE$

0TH SHARE$

18

CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE 3Bl204 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHATTAHOOCHEE MANAGER: STEVE KISH

t

CONG DIST. 2

OPERATING 1995 $

41

FUND SOURCE: RURAL TRANSIT

FED SHARE$

23

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

18

CHATTAHO COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1205 TRANSIT FACILITIES/ OPERATIONS
FUNDS. RECIPIENT: CHATTAHOOCHEE MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1996 $

43

FUND SOURCE: RURAL TRANSIT

FED SHARE$

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

19

CHATTAHO ONE CONV. VAN/LIFT, ONE STANDARD VAN AND TWO MOBILE RADIOS 3C2203 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHATTAHOOCHEE COUNTY MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1994

$

54

FUND SOURCE: RpRAL TRANSIT

FED SHARE$

43

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

0TH SHARE$

5

CHATTAHO SR 1@ HICHITEE CREEK 321580 . REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .30 MANAGER: M. REYNOLDS (C)

CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322160 IS AN ASSOCIATED PROJECT.

PE 1990 UNDERWAY

ROW NONE $

0

CONST 1996 $ 865

FED SHARE$

692

GA. SHARE$ 173

0TH SHARE$

.,

..

. ,

1

ffiM

. PiM8 ,,~ ~ l ~ ~ Mn!ill@ !~(~;," I&~ ~ !*-'ki:',~:li lo/2"~";~

--::

;-::::~"-({-.:~:

~

-. ~-~

):-



COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT.OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

16-Sep-1993 Page 57

FISCAL YEAR

COST ESTS

CHATTOOG US 27@ ARMUCHEE & LITTLE ARMUCHEE CRKS/SEE FLOYD CO 62107Z UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .06 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: RAY METTS

PE NONE $

0

CONG DIST. 7

ROW NONE $

0

GRIP PROJECT

CONST 1994 $

0

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

621075 IS AN ASSOCIATED PROJECT.

0TH SHARE$

CHATTOOG SR 48 W/SUMMERVILLE EB/WB/TL MP 9.96-10.86;WB 11.7-12.05
621330 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.25 MANAGER: BILL MCVEY

CO~G DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

593

FED SHARE$ 474

GA. SHARE$

119

0TH SHARE$

CHATTOOG CR 1 NE OF TRION@ CHAPPEL CRK 670720 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .13 MANAGER: BILL MCVEY

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$

180

FED SHARE$

144

GA. SHARE$

36

0TH SHARE$

CHATTOOG CR 170/PENN BRIDGE RD OVER CHATTOOGA RIVER SE OF TRION 670750 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .15 MANAGER: BILL MCVEY

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 1079

FED SHARE$

863

GA. SHARE$ 216

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 58

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

-------------------------------.--------

----------------

------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE

6Bl338 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 9 & 6

FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH

f_

OPERATING 1994 $

83

FUND SOURCE: RURAL TRANSIT

FED SHARE$

49

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

34

CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6Bl339 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH

CONG DIST. 9 & 6

OPERATING 1995 $

87

FUND SOURCE: RURAL TRANSIT

FED SHARE$

51

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

36

CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE 6Bl340 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH

CONG DIST. 9 & 6

OPERATING 1996 .$

90

FUND SOURCE: RURAL TRANSIT

FED SHARE$

53

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

37

CHEROKEE ONE CONVERSION VAN AND ONE MINIBUS 6C2338 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH

CONG DIST. 9 & 6

CAPITAL 1994

$

71

FUND SOURCE: RURAL TRANSIT

FED SHARE$

57

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

7

0TH SHARE$

7

CHEROKEE TWO CONVERSION VANS 6C2339 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE
MANAGER: STEVE KISH

CONG DIST. 9 & 6
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1995

$

57

FED SHARE$

46

GA. SHARE$

5

0TH SHARE$

6

CHEROKEE ONE MINIBUS 6C2340 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH

CONG DIST. 9 & 6

CAPITAL 1996

$

42

FUND SOURCE: RURAL TRANSIT

FED SHARE$

34

FEDERAL TRANSIT ADMIN FUNDS

- GA. SHARE $

4

0TH SHARE$

4

CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl013 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY
MANAGER: STEVE KISH

CONG DIST. 9 & 6

CAPITAL 1994

$

16

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

f.

. .,

,.

gm

l!!!!!!!!J

~
,,

~

~

~

~

~'~~8

e~n

t:lf!..b,


~e-~

v..........;.~

r.::~::;:~:.)1

11,,K.~1

it . :.;~

.r: ..~ '

,. 'i
.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 59

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

-----------

CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

COMMENTS

YEAR

EST$

--------------------------------.-------------------------

6V1014 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 9 & 6

FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY

CAPITAL 1995

$

16

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: CHEROKEE COUNTY MANAGER: STEVE KISH

CONG DIST. 9 & 6

CAPITAL 1996

$

16

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

CHEROKEE I-75@ SR 92

610740 INTERCHANGE/ RECST. OR REHAB.

I

PROJECT MILEAGE : .45 - EXIST. LANES: 4 /PROPOSED LANES: 6

MANAGER: RAY METTS (M)

ATLANTA TIP I CH/R 108
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CON::r

UNDERWAY AFTER 96 AFTER 96

CHEROKEE I-575 SB ON RAMP FROM CR 416/TOWNE LAKE PARKWAY 610970 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CHEROKEE SR 92 FM WOODSTOCK RD TO CHEROKEE TRAIL 620920 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.75 MANAGER: RAY METTS (M)

ATLANTA TIP I CH 24
CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CH 3 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1996 $ 121

FED SHARE$ 109

GA. SHARE$

12

0TH SHARE$

PE 1996 ROW CONST

$

150

AFTER 96:

AFTER 96

CHEROKEE SR 92 FM I-75 TO WOODSTOCK RD 620940 RECONSTRUCTION & WIDENING.FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.59 MANAGER: RAY METTS (M)

ATLANTA TIP I CH 4
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW
CONST

$

150

AFTER 96

AFTER 96

CHEROKEE SR 92 FM E OF SR 754 TO OLD MOUNTAIN PARK RD/COBB 621200 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.10 MANAGER: RAY METTS

ATLANTA TIP f CH 20 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY .I\DMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$ 7192

CONST 1996 $ 8975

FED SHARE $ 7180

GA. SHARE $ 1778

0TH SHARE $

17

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 60

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P. I.NO.

PROJECT DATA

-- CHEROKEE SR 140 REL FM CR 311 NW TO CR 375;THEN NEW LOC TO CR 765

621240 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 3.30

MANAGER: RAY METTS _(M)

FISCAL

COST

-------AC--TOL-NA-GN---TDA-CIO-SM-TT-MI. P-E-6N-f.T-S-CH---.5---------------------RO-PW-EY-E-A1-R9-9-2-----AU-NEF-TDS-TEER-RSW--A9Y6

CONST

AFTER 96

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

CHEROKEE SR 92 FM CHEROKEE TRAIL TO CANTON HWY/SR 754 621390 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10
MANAGER: N. PASSMORE (M)

ATLANTA TIP f CH 9 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY
$ 3712 AFTER 96

CHEROKEE CANTON HWY FM PALM RD/CR 351 TON/SIXES RD [INCL RR BR) 630673 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
PROJECT MILEAGE: .37 MANAGER: .BILL MCVEY
CHEROKEE SR 140 FM SR 5 BUS TO LOWER BURRIS RD NORTH OF CANTON 630942 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 3.22 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f CH2 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 63Y673 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CH .7
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY ROW LOCL CONST 1996 $ 500
FED SHARE$ 400 GA. SHARE$ 100 0TH SHARE$

PE 1992 ROW_
CONST

UNDERWAY
AFTER 96 AFTER :96

CHEROKEE CR 770/BELLS FERRY RD FM CR 421 TO CR 1012 630945 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.00 MANAGER: H. ASHMORE
r.
CHEROKEE CR 770/BELLS FERRY RD NEW PARALLEL BR@ LITTLE RIVER 630975 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .21 MANAGER: H. ASHMORE
CHEROKEE CR 770/BELLS FERRY RD FM CR 1012 TON OF N/VICTORIA RD 630977 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.90 MANAGER: H. ASHMORE(M)

ATLANTA TIP t CH 1
CONG DIST. 6 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I.CH 18 CONG DIST. 6 -
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t CH .10
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW LOCL

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

o
2182 1746
186 250

-
PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 5526 FED SHARE$ 4421 .
GA. SHARE$ 1105 0TH SHARE$

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

,.

. ,



~

-= ~

~ ~


~

~'~~

~

ttt:.;~,lii;~

~=~:.:::et1


~'ili!ltl

tx~-~~

~': .. ::

tr~-~

I': ::,~

.. ~~ .,

. ;~;...... ~~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 61

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-PH-E-. RI-.O-NK-O-EE-. -S-R--5-B--/S-R--1-4-0--F-MP-R-O5---JLE-NC-T--SD-O-A-TFA--H-I--SC-H-O--O-L--N--T-O-E---O-F--H-O-S-P-IT-A--L--D-R---------A-T-LA--N-T-AC-O-MT-MI-PE-N-fT-S-C-H--1-6---------------------P-EY-E-A1-R9-9-2-----U-EN-DS-TER-SW--AY

631000 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 9

ROW 1991

UNDERWAY

PROJECT MILEAGE : 1.15

CONST 1994

$ 1839

MANAGER: K FULBRIGHT

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 1471

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

368

0TH SHARE $

CHEROKEE CR 1061/CANTON HWY FM END OF MULTI-LN N/I-575 TO SR,20 631130 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.77
MANAGER: M GANNAWAY (M)

ATLANTA TIP f CH 6 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992
ROW LOCL CONST

UNDERWAY AFTER 96

CHEROKEE SR 5 BUS FROM HOSPITAL DR/CS 657 NE TO I-575/SR 5 631150 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.21 MANAGER: K FULBRIGHT (M)

ATLANTA TIP f CH 8 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

CHEROKEE CR 772/KELLOG CREEK RO @ KELLOG CREEK 631215 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .15 MANAGER: H. ASHMORE
CHEROKEE SR 140/CANTON-ROSWELL RD AT CR 297/EARNEY RO & CR 311/MTN RO 631390 INTERSE.CTION IMPROVEMENT / TRAFFIC
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
CHEROKEE SHOWN FOR STP FUNDS ONLY ..... SEEP.I. 630673 63Y673 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BILL MCVEY
(_
CHEROKEE SR 20@ SR 372 641701 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .12 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: BILL MCVEY.

ATLANTA TIP f CH 19 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
ATLANTA TIP f CH 25 CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CH 2 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630673 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f CH 15 CONG DIST. 6 & 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW LOCL
CONST 1996 $ 749 FED SHARE$ 599 GA. SHARE$ 150 0TH SHARE$

PE NONE $

0

ROW 1994 $ 275

CONST 1994 $ 418

FED SHARE$

376

GA. SHARE$

42

0TH SHARE$

PE 1994

UNDERWAY

ROW 1985 UNDERWAY

CONST 1996 $ 321

FED SHARE$ 257

GA. SHARE$

64

0TH SHARE$

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

285

FED SHARE$ 257

GA. SHARE$

29

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 62

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

----------------------------------------

------------------------

.--------------C-O-M-M--E-N-TS---------------------------Y--EA-R---------E-S-T-S--

CHEROKEE BELLS FERRY RD FM COBB CO LINE TO PINE RIDGE DR

ATLANTA TIP f CH 13

PE NONE $

0

650370 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 6

ROW LOCL

PROJECT MILEAGE : 1.43

CONST 1994

$ 3401

MANAGER: H. ASHMORE

_FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 2721

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

680

0TH SHARE$

CHEROKEE CR 770/BELLS FERRY RD FM PINE RIDGE DR TO BASCOMB CARMEL RD
650375 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.01 MANAGER: H. ASHMORE

ATLANTA TIP f CH 14 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW LOCL

CONST 1994

$.

FED SHARE$

GA. SHARE$

0TH SHARE$

0
2178 1742
436

CHEROKEE HISTORIC TRAIN DEPOT RESTORATION IN HOLLY SPRINGS 670840 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

ATLANTA TIP f CH 22 CONG DIST. 6 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996

$

175

FED SHARE$

140

GA. SHARE $ '

0TH SHARE$

35

CHEROKEE HISTORIC DEPOT RESTORATION IN WOODSTOCK & SIDEWALKS 670850 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ATLANTA TIP f CH 23 CONG DIST. 6 & 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONSTl995

$

125

FED SHARE$

100

GA. SHARE$

0TH SHARE$

25

CHEROKEE SR 140 FM RANCHETTE RD TO CR 311:BR@ LITTLE RVR/SEE FULTON
72130X UNKNOWN/ UNKNOWN. PROJECT MILEAGE : .05 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: RAY METTS

ATLANTA TIP t FN 13 CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721305 IS AN ASSOCIATED PROJECT.

PE 1991 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

CHEROKEE SR 140/HOUZE RD@ LITTLE RIVER@ CHEROKEE CO LINE 72130Z REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: RAY METTS

ATLANTA"TIP t FN 13
CONG DIST. 6
. FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721308 IS AN ASSOCIATED PROJECT .

PE 1991 ROW LOCL CONST

UNDERWAY AFTER 96

., ,.

'

., ,

'...-:o.

~

~

~ ~


~.3

~

~ ..:J.,,.t/' ,;;.:...i:,

~g:~~

==..;:;;::,

c~y,?:1


pJi:i!!.il

:~~.~~

h~!~~

r;~to-t:~1

ii-:;:)

~
.

..,, ~ \ _, ._. I

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 63

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O-.----------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-ST--S--
CLARKE MULTI-MODAL TRANSP. CTR, VEHICLES, CAP. MAINT., REPAIRS, ETC

101010 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 10

FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM

CAPITAL 1994

$ 1707

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$ 1366

, '

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

171

0TH SHARE$

171

CLARKE 101011

VEHICLES, CAP. MAINT., REPAIRS, SIGNS, POLES, SHELTERS, ETC.
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1995

$ 357

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$ 286

FEDERAL TRANSIT,ADMIN FUNDS

GA. SHARE$

36

0TH SHARE$

36

CLARKE 101012

VEHICLES, CAP. MAINT., SHELTERS, BUS SIGNS, POLES, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1996

$ 425

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

340

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

43

0TH SHARE$

43

CLARKE ADA EQUIPMENT FOR BUSES - PUBLIC ADDRESS, PHONE, VOICE SYST.

101013 TRANSIT PROJECTS/ CAPITAL

.

CONG DIST. 10

FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM

CAPITAL 1994

$

58

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

52

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

CLARKE 101014

ADA EQUIPMENT FOR BUSES - VOICE ANNUNCIATION SYSTEMS
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1995

$

11

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

10

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

CLARKE 101016

PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE-KISH

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994 $ FED SHARE$
GA. SHARE$ 0TH SHARE$

1050 525
525

CLARKE 101017

PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

1100 550
550

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

CLARKE 101018

PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE COUNTY
TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIEN.T: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST .. 10
FUND SOURCE: URBAN TRANSIT F~DERAL TRANSIT ADMIN FUNDS

16-Sep-1993 Page 64

FISCAL YEAR

COST ESTS

.---------------- ----------

OPERATING 1996 $ . , FED- SHARE $
GA. SHARE$ 0TH SHARE$

1300 364 1 937

CLARKE 1Vl010

ELDERLY AND DISABLED'VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1994

$

15

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

12

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

CLARKE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

(

lVlOll TRANSIT PROJECTS/ CAPITAL

CONG DIST. 10

FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA

CAPITAL 1995,

$

15

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

12

(.

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

CLARKE 1Vl012

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA
MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1996

$

16

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

CLARKE 121970

CR 600/DANIELSVILLE RD FM 4-LN NEAR CR 109 TO CR 107/HULL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .43 MANAGER: L. OWENS

ATHENS TIP f II-01-2 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

CLARKE 121990

PRINCE AVE FM S/SR 8 TO 600' N/CSX RR BR ON JEFFERSON ST INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE: .50 - EXIST. LANES: 4 /PROPOSED LANES: 8
MANAGER: L. OWENS

CLARKE 122160

SR 15 ALT/US 129 FM LAVENDER DR IN CLARKE CTY TO SR 330 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.71 MANAGER: RON BRAZIEL (M)

ATHENS TIP f II-01 CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122350 IS AN ASSOCIATED PROJECT.

ATHENS TIP f II-02-2

CONG DIST. 19

.

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1994

$. 2197

FED SHARE $ 1758

GA. SHARE $

439

0TH SHARE $

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

.. ....

' _;;

,. "'

., ..

. '

'P

--

MM

M!8

~


== { ~

~

~L~

~~

lfth11i

~:r;.11:"tij


~:.~

.Wi~~

(.!::;~;~1

,~!t'!

i:i:.::":U

~:f:.-:'.~


.i:.-;.v.....:~\~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 65

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-PL-A-. R-I.K-NE-O--. -S-R--1-5-/-P-R-I-N-C-E--A-P-VR-EO-/N-JE-CA-T-TH-D-ENA-ST-A--B-Y-P-@---C-SX---R-R----------------------------A-T-H-E-N-S-C-OT-MI-PM-E-fN-T-SI-I--0-2-----------------------P-EY-E-A1-R9-9-2-----U-NE-DS-ETR-SW--AY

122350 REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 6 LANES.

CONG DIST. 10

ROW NONE

$

0

PROJECT MILEAGE : .10

CONST 1994

$

350

MANAGER: L. OWENS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE. $ 280

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

70

121990 IS AN ASSOCIATED PROJECT.

0TH SHARE $

CLARKE 12257Z

SR 10/US 78 MONROE TO ATHENS, MEDIAN OPENINGS; SEE WALTON
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

0

ROW NONE $

0

CONST 1994

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

CLARKE 122600

SR !OLP/ATHENS BYPASS NB ON & OFF RAMPS TO WINTERVILLE RD
RAMP/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 2 MANAGER: L. OWENS (M)

ATHENS TIP f III-OS CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW 1996 CONST

$

10

$

10

AFTER 96

CLARKE 122680

SR 8/US 78@ HUNTINGTON RD AND ATHENS BYPASS

r

INTERSECTION IMPROVEMENT/ TRAFFIC

PROJECT MILEAGE : ,53 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. OWENS

CLARKE 13234Z

SR 10 FM ALCOVY RIVER/WALTON THRU OCONEE TO SR 8/CLARKE GUARDRAIL/ TRAFFIC PROJECT MILEAGE : 10.10 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CLARKE 15021X

EPPS BRIDGE RD@ MCNUTT CREEK ... SEE OCONEE UNKNOWN/ UNKNOWN PROJECT MILEAGE : ,00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: UNKNOWN

CLARKE 15021Y

CR 473/EPPS BR RD FM SR 10/0CONEE TO US 78 ... SEE OCONEE UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1994

$

150

CONST 1994

$

450

FED SHARE $

405

GA. SHARE $

45

0TH SHARE $

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

ATHENS TIP f II-03

PE NONE $

0

CONG DIST. 10

ROW LOCL

CONST 1995 $

0

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

150215 IS AN ASSOCIATED PROJECT.

0TH SHARE$

ATHENS TIP f II-03

PE NONE $

0

CONG DIST. 10

ROW LOCL

. CONST 1995

$

0

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

FEDERAL.HIGHWAY ADMIN FUNDS

GA. SHARE$

150210 IS AN ASSOCIATED PROJECT.

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 66

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

C-JL-.A->R-,IK-,NE-O--. -T--R-A-IL-S--A-L-O-N-G--O-PC-RO-O-N-EJE-EC-T-R-IV-D-A. -TA-IN---U-G-A--E-.--C-A-M-P-U-S---E-X-P-A-N-S-IO--N--A-R-E-A----------A-T-H-E-N-S-C-OT-MI-PM-E-IN-T-VS---0-2-----------------------P-EY-E-AL-OR-C-L------E-S-T-S--

-170920 BICYCLE/PED. FACILITY/ ENHANCEMENT

CONG DIST. 10

ROW LOCL

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

886

MANAGER: UNKNOWN

FUND SOURCE: TRANS, ENHANCE.

FED SHARE$

709

FEDERAL HIGHWAY ADHIN FUNDS

GA. SHARE$

0TH SHARE$

177

CLARKE 170925

BIKEWAY/LANDSCAPING ON EPPS BRIDGE ROAD IN ATHENS BICYCLE/PED. FACILITY/ ENHANCEMENT . PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: H. ASHMORE

ATHENS TIP I V-01
CONG DIST, 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1995 $ 675

FED SHARE$

540

GA. SHARE$

0TH SHARE$

135

CLARKE 170960

LUMPKIN ST/ BAXTER ST SIGNAL SYSTEM IN ATHENS SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

CLARKE 170970

ATHENS CBD SIGNAL SYSTEM
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

ATHENS TIP I III~02
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATHENS TIP f III-04 CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

95

FED SHARE$

86

GA. SHARE$

10

0TH SHARE$

'

PE NONE $

0

ROW NONE .$

0

CONST 1996 $ 220

FED SHARE$

198

GA. SHARE$

22

0TH SHARE$

cLARKE 170980

REALIGNMENT OF RIVERBEND RD FM MILLEDGE AV TO COLLEGE STA RD
MINOR WIDEN & RESURF / TRAFFIC PROJECT MILEAGE : 1.40 ~EXIST.LANES: 2 /PROPOSED LANES: 2
MANAGER: L. OWENS

ATHENS TiP f III-01 CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1994 $ 130

FED SHARE$

117

GA. SHARE$

13

0TH SHARE$

CLARKE 171015

BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT fl BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 ~EXIST.LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

(_

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 517

FED SHARE$

414

GA. SHARE$ 103

0TH SHARE$

...
t

..

I 0

'V5-

9IIJl!!!I

~ ffl!!!!!1 I!!!!!! 91!!.!
~

~

~

t~~1'J

~

~.:;hi@'

a::..,:;:,~
'

t!t:!'.!:~2

/ffe,~

~;~~:>.~

r~,XJ'..!l

';.'..!C:<.'.;i

~~]

t:;

.

...; ..

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 67.

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLAY

COUNTY OPERATED PUBLIC TRANSIT SERVICE

4B1263 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 2

FUNDS RECIPIENT: CLAY

OPERATING 1994

$

51

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

31

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

20

CLAY 4B1264

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH

CLAY 4B1265

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1995 $

53

FUND SOURCE: RURAL TRANSIT

FED SHARE$

32

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

21

(

CONG DIST. 2

OPERATING 1996 $

55

FUND SOURCE: RURAL TRANSIT

FED SHARE$

33

FEDERAL TRANSIT ADMIN FUNDS

.GA. SHARE $

0TH SHARE$

22

CLAY 4C2263

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

CLAY 4C2264

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1995

$

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

3

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

16-Sep-1993 Page 68

FISCAL YEAR

COST ESTS

CLAYTON 7Vl010

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH

CONG DIST. 3

CAPITAL 1994

$

26

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

21

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

3

CLAYTON 7Vl011

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH

CONG DIST. 3

CAPITAL 1995

$

27

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

22

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

2

0TH SHARE$

3

CLAYTON 7Vl012

ELDERLY AND DISABLED-VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH

CONG DIST. 3 .

CAPITAL 1996

$

28

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

22

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

CLAYTON 31097X

I-75 FM I-675 TO SR 7/US 41/HENRY (NOISE BARR. & LIGHTING) WALLS/ RECST. OR REHAB. PROJECT MILEAGE : 7.80 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: J. GRAYBEAL
(

ATLANTA TIP f CL-R 12 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 310976 IS AN ASSOCIATED PROJECT.

PE 1996 ROW NONE CONST

$

0

$

0

AFTER 96

CLAYTON 32205X

SR 42 FM SR 138/HENRY TO I-675 NB RAMPS .. SEE HENRY CO UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: H. REYNOLDS

ATLANTA TIP f CL64/HE5 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 322050 IS AN ASSOCIATED PROJECT.

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

CLAYTON 712420

1-75 FM US 41/0LD DIXIE HWY TO I-285/INCL BR & FNTGE RDS RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.
PROJECT MILEAGE : 5.90 MANA;ER: J. GRAYBEAL

ATLANTA TIP t CL-R.11
CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1988 UNDERWAY

ROW 1991 UNDERWAY

(. CONST 1994

$ 17499,

FED SHARE $ 13999

GA. SHARE $ 3500

0TH SHARE $

CLAYTON 712425

1-75 FM SR 3/US 41/0LD DIXIE HWY TO I-285 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 2.90 MANAGER: J. GRAYBEAL (M)

ATLANTA TIP f.CL-R 11 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
I>

PE 1996 ROW CONST

$ 1000 AFTER 96 AFTER 96

,. ,.

..

't.

;{1111

~

.. -.. ~ ~

l!!!!!l!!I!'!

~

~

~

~

~

.l!l,!!,!.t~,!'ll

~.

l'!;~l':;.:i

F~~

-!-~t7"'.-~

~

.. ., ~

],;-:-- ....

'

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 69

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLAYTON I-285@ CONLEY ROAD

ATLANTA TIP f CL 4

PE 1988 UNDERWAY

712430 BRIDGES/ RECST, OR REHAB.

CONG DIST. 3

ROW LOCL

PROJECT MILEAGE :' .10

CONST

AFTER 96

MANAGER: G, ROSS

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 712602

LEE STREET IN MORROW OVER I-75
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : ,08 MANAGER: J. GRAYBEAL(CM)

ATLANTA TIP f CL 59 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

CLAYTON 712630

I-75/MORROW@ SR 54 (INCL RR BRIDGE OVER I-75) INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .23 - EXIST. LANES: 4 /PROPOSED LANES: 8 MANAGER: J. GRAYBEAL(CM)

CLAYTON 712970

HOV LN SIGNING ON I-75 & I-85 METRO/FUL;COBB;GWIN
HOV LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

CLAYTON 713050

I-675, I-75, I-20: IMPACT ATTENUATORS&BARRIER WALL AT BR. IMPACT ATTENTUATORS / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CLAYTON 713090

I-85 NB 62 SIGNS FROM I-285 TO SR 166 LAKEWOOD FWY .. FULTON

SIGNING/ MAINTENANCE

PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

r..

CLAYTON 713110

I-75, VAR LOC FROM I-285 SOUTH TO BARRETT PKWY .. FUL-COBB
PVMNT MARKINGS/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: L. SEABROOK

ATLANTA TIP f CL-R 31 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

ATLANTA TIP i R 73
CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

ATLANTA TIP t R 130
CONG DIST. 3 & 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS

ATLANTA TIP f R 130 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS 71309Z IS AN ASSOCIATED PROJECT.

ATLANTA TIP t R 130

CONG DIST. 5

..

FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71311X IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 6221

FED SHARE$ 6221

GA. SHARE$

0TH SHARE$

PE 1994

UNDERWAY

ROW NONE $

0

CONST 1994 $ 1000

FED SHARE$ 1000

GA. SHARE$

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 223

FED SHARE$ 223

GA. SHARE$

0TH SHARE$

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 615 615

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 70

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P-.I-.-N-O--.----------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLAYTON I-75 FM US 41/0LD DIXIE HWY TO I-285; TO SHOW IM FUNDS

ATLANTA TIP f CL-Rll

PE NONE $

0

71Y420

RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.

PROJECT MILEAGE 5,90

MANAGER:

.

CONG DIST. 3 FUND SOURCE: I-STATE HAINT.

ROW NONE $

CONST 1994

$

FED SHARE$

0
6501 5851

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

650

0TH SHARE$

CLAYTON 720815

SR 42 FM LAKE HARBIN RD N TO ANVIL BLOCK RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.52 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f, CL 12 CONG DIST. 3
F~ND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 731090 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1996.
CONST

UNDERWAY

$

975

AFTER 96

CLAYTON 720817

SR 42/HACON HWY@ UPTON CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .OO MANAGER: M. REYNOLDS .(M)

ATLANTA TIP f CL 79 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1996

$

155

FED SHARE $

124

GA. SHARE $

31

0TH SHARE $

'CLAYTON 721040

SR 54 (& FAYETTE CO) @ MORNING & CAMP CRKS; & FLINT RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .70 MANAGER: D. GODWIN

ATLANTA TIP f CL23/FY2

CONG DIST. 3 ,

.

FUND SOURCE: BRIDGE PROGRAM
FEDERA.L HIGHWAY ADMIN FUND. S

PE 1986 UNDERWAY

ROW 1994

$

552

CONST 1995 $ 3246

FED SHARE $ 2597

GA. SHARE $

649

0TH SHARE $

CLAYTON 721270

SR 42/HACON HWY FM S/ANVILBLOCK RD TO OLD TONY RD/DEKALB RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.30 MANAGER: M, REYNOLDS

ATLANTA TIP f CL10/DK8
CONG DIST. 3 & 11
FUND SOURCE: SURFACE T~SPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1992 UNDERWAY

CONST 1996

$ 4235

FED SHARE $ 3388

GA. SHARE $

847

0TH SHARE $

CLAYTON 721290

SR 85 FM SR 279/FAYETTE N TO 6-LN@ ROBERTS DR/CLAYTON RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE: 4.10 MANAGER: K FULBRIGHT (M)

ATLANTA TIP f CL15/FY4

CONG DIST. 3

.

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 1600 AFTER 96

CLAYTON 721295

SR 85 NBL@ CAMP CREEK@ FAYETTE CO LINE

REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 6 LANES.

PROJECT MILEAGE : .03

'

MANAGER: K FULBRIGHT (M)

ATLANTA TIP f CL 77 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1996

$

294

FED SHARE $

235

GA. SHARE $

59

0TH SHARE $

.

! r\ll

(O

,,

.... ~,p

~

1!!!!!!!!!!111

. -~ ~

II,

., ... }

"@R

~

= ~

~

~ .i!L~ ~ ~

--,

"'

~

b~

l<.'..i.L'..;,"-i

~

. ~~~~~i



1'.~.~H '.~'!

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 71

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I,NO.
C-L-A-Y-T-O-N-

PROJECT DATA
S-R---1-3-8--FM---W-A-L-T--S-TEP-H-E-N--S--R-D--E-AST

TO--I--7-5-/H--E-N-R-Y---CO-------------------A-T-LA-N--TA-C-O-MT-MI-PE-N-fT-S-C-L--3-1---------------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY

721480 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 3

ROW 1996 $ 5180

PROJECT MILEAGE : 3.55

CONST

AFTER 96

MANAGER: RON BRAZIEL (M)

"FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 721550

SR 85 FM ADAMS DR TO RAMP@ I-75/INCL INTCH@ FOREST PKWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 3.10 MANAGER: N. PASSMORE (M)

ATLANTA TIP f CL 14 CONG DIST. 3 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AFTER 96 AFTER 96

CLAYTON 721555

SR 85@ SR 331 & I-75 RAMP INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

CLAYTON 721860

TARA BLVD@ I-75 (GATEWAY PROJECT) LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST.-LANES: 6 /PROPOSED LANES: 6
MANAGER: J. GRAYBEAL (C)

CLAYTON 731050

SR 85 AT SR 138 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GODWIN

CLAYTON 731060

SR 85 AT VALLEY HILL ROAD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 6 /PROPOSED LANES: 6
MANAGER: D. GODWIN.

CLAYTON 731070

TARA BLVD AT OLD DIXIE HWY INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER: D. GODWIN

ATLANTA TIP f CL 82 CONG DIST. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 122 CONG DIST. 3 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 80 CONG DIST. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 81 CONG DIST, 3 & 5 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 84 CONG DIST. 3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1994 $ 904

FED SHARE$ 814

GA. SHARE$

90

0TH SHARE$

PE NONE $

0

ROW NONE $"

0

CONST 1994

$

120

FED SHARE$

96

GA. SHARE $-

36

OTH SHARE$

60

PE NONE $

0

ROW 1994 $

77

CONST 1995 $ 165

FED SHARE$ 149

GA. SHARE $

17

0TH SHARE$

PE 1994 UNDERWAY

ROW 1994

$

33

CONST 1995 $ 243

FED SHARE $ 219

GA. SHARE $

24

0TH SHARE $

PE 1994 UNDERWAY

ROW 1994

$

61

CONST 1994

$

271

FED SHARE $

271

GA. SHARE $

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 72

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

----------------------------------------------------------------------------

----C-OM--M-E-N-TS----------------------------Y-EA--R--------E-S-T-S--

CLAYTON SR 42 AT DOUBLE BRIDGE ROAD

ATLANTA TIP I CL 88

PE NONE $

0

731090 INTERSECTION IMPROVEMENT / TRAFFIC

(

CONG DIST; 3

ROW 1994

$

50

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2

CONST 1994

$

300

MANAGER: D. GODWIN

..

FUND SOURCE: HWY. SAFETY

_ FED SHARE $ 270

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

30

720815 IS AN ASSOCIATED PROJECT.

0TH SHARE$

CLAYTON 731400

SR3/US19&41/TARA BLVD AT CR 537/FREEMAN RD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .31 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP I CL 92 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE- NONE

$

0

ROW NONE $

0

CONST 1994

$

154

FED SHARE$

154

GA. SHARE$

0TH SHARE$

CLAYTON 751730

CR 1342/BATTLE CREEK RD@ JESTERS CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: D. GODWIN

ATLANTA TIP I CL 17 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1991

UNDERWAY

ROW LOCL

CONST 1996

$

409

FED SHARE$ 327

GA. SHARE$

82

0TH SHARE$

CLAYTON 751760

MT ZION RD FM SR 54 SE TO MT ZION BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.45 MANAGER: J. GRAYBEAL (C)

ATLANTA TIP I CL 18 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

10

AFTER ~6

CLAYTON 751770

BATTLECREEK-MT.ZION FM SOUTHLAKE PKWY TO LAKE HARBIN RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.63 MANAGER: J. GRAYBEAL (C)

ATLANTA TIP f CL 19 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$'

10

AFTER 96

CLAYTON 751775

BATTLE CREEK RD FM VALLEY HILL RD TO SOUTHLAKE PKWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.98 MANAGER: D. GODWIN -

ATLANTA TIP I CL 17
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

10

AFTER 96

CLAYTON 751790

PANOLA RD FM BOULDERCREST RD TO STAGECOACH RD RECONSTRUCTION'& WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.10 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f CL16/HE4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

10

AFTER 96

,.
~

' '

~

'

,

,,")
~

!lJ!!l!!!ll

M!!l!!I l!!J!!lll!l!!!I


Si!!!!.WJ
"

~

~

~

~

~

.~Jft.t.~ .,

f:lt!t~~
~ ....

~

(fi~;:,tii

r~:f;i~t..~

k'. :.:,;!l~

..... i;.> .!:::

T'~:'~

;.:, ,.

,\.,,~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 73

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

CLAYTON ANVILBLOCK RD FM END OF WIDENED SECTION E TOBOULDERCREST RD

ATLANTA TIP f CL .60

PE 1996 $

10

751800 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 3

ROW LOCL

PROJECT MILEAGE : .63

CONST

AFTER 96

MANAGER: D. GODWIN

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 751810

FLINT RIVER RD FM WEBB DR TO TARA BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2.71 MANAGER: D. GODWIN

ATLANTA TIP f CL 20 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

10

AFTER 96

CLAYTON 751850

SR 314/FAYETTE'LE RD FM SR 279 TO NORMAN DR/CR 255 .. FAYETTE RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 5.63 MANAGER: M GANNAWAY (M)

1.

CLAYTON 751855

SR 314/FAYETTEVILLE RD FM NORMAN DR/CR 255 TO SR 139 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.53 MANAGER: M GANNAWAY (M)

ATLANTA TIP f CL5/FY8 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 75185X IS AN ASSOCIATED PROJECT.
ATLANTA TIP f CL62/CL5 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$ . 250 AFTER 96
AFTER 96

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

CLAYTON 752060

MORROW RD/CR 1348@ JESTER'S CREEK REPLACEMENT OF .THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .20 MANAGER: D. GODWIN

CLAYTON 752180

CONLEY RD FM OLD DIXIE HWY/SR 3 TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.70 MANAGER: G. ROSS

ATLANTA TIP f CL 78 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL 74 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 196

FED SHARE$

157

GA. SHARE$

39

0TH SHARE$

PE 1995 ROW LOCL CONST

$

51

AFTER 96

CLAYTON 752240

FOREST PARKWAY@ GERMAIN INDUSTRIAL BLVD WEST OF SR 42 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .45 - EXIST. LANES: 2 /PROPOSED LANES:. 2
MANAGER: D. GODWIN

ATLANTA TIP f CL 86 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW LOCL

CONST 1995 $ 295

FED SHARE$ 266

GA. SHARE$

30

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 74

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

COMMENTS

FISCAL YEAR

COST ESTS

- - CLAYTON JESTERS CK GREENWAY FM JONESBORO TO MORROW

--------A-T-L-A-N--TA---T-IP---f --C-L--8-9 ---------------------P-E--L-O-C-L-----------

770460 BICYCLE/PED. FACILITY/ ENHANCEMENT

CONG DIST.-;3

ROW LOCL

PROJECT MILEAGE : 4.00.- EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1995 $ 1734

MANAGER:.UNKNOWN

FUND SOURCE: TRANS. ENHANCE.

FED SHARE$ 1387

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

347

CLAYTON 770500

HISTORIC DEPOT RESTORATION IN JONESBORO MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

ATLANTA TIP f CL 90 CONG DIST .. 3
FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996 $ . 94

FED SHARE$

75

GA . SHARE $

0TH SHARE$

19

CLAYTON 770600

TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN CLAYTON COUNTY r:-
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

ATLANTA TIP f CL 94 CONG DIST. 3
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

50

ROW NONE $

0

CONST 1995 $ 450

FED SHARE$ 360

GA. SHARE$

0TH SHARE$

90

,. .1 .,

...

...

~-"t

I!!!!!!!!!!

1!!11!!!!!!!1

,P-m
'

~ ,,

COUNTY P. I.NO.

~

~

~

DESCRIPTION PROJECT DATA

~

~

= ~

~

r'

e;~:id

~

~.i(.::.:~

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

i: ~r~

..I...::

,~~

16-Sep-1993 Page 75

FISCAL YEAR

COST ESTS

CLINCH 422055

SR 38/US 84@ SUWANNOOCHEE CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: N. PASSMORE (M)

CONG DIST. 8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 422050 IS AN ASSOCIATED PROJECT.

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

CLINCH 431065

SR 187@ SUWANNOOCHEE CRK OFLW S/HOMERVILLE

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES ..

PROJECT MILEAGE : 1.00

(_

MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992. UNDERWAY

ROW 1994

$

1

CONST 1995 $

275

. FED SHARE $

220

GA. SHARE $

55

0TH SHARE $

CLINCH 43106X

SR 187@ SUWANNOOCHEE CRK/SEE ECHOLS COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 431060 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1994

$

0

CONST 1995

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

GEORGIA DEPARTM_ENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 76

PROJECT LISTING BY COUNTY FY 1994/FY 1996

------ COUNTY P, I.NO. COBB

DESCRIPTION

PROJECT DATA

- - ---

-

PERMANENT OPERATIONS/MAINT,

FACILITY

DEVEL-O-P-M--EN-T

--

FISCAL

COST

PHAS-E---I -------------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

7D7014 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 7 & 6

FUNDS RECIPIENT: COBB COUNTY MANAGER: STEVE KISH

CAPITAL 1994

$ 2725

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$ 2180

FEDERAL TRANSIT ADMIN FUNDS

GA, SHARE$ 273

0TH SHARE$

273

COBB 7D7027

PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS./ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

2594 1297
1297

COBB 7D7028

BUS PURCHASES, P & R LOT DEV., TRANSFER FACILITY, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

6157 4926
616 616

COBB 7D7029

TRANSIT COACHES, PARATRANSIT BUSES, AND PLANNING PROJECTS

TRANSIT PROJECTS/ CAPITAL

FUNDS RECIPIENT: COBB COMMUNITY TRANSIT

r.

MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

2736 2189
328 219

COBB 7D7030

TRANSIT COACHES, PARATRANSIT BUSES, AND PLANNING PROJECTS TRANSIT-PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

2736 2189
328 219

COBB 7D7044

PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995

$

896

FED SHARE$

448

GA. SHARE$

0TH SHARE$

448

COBB 7D7045

PUBLIC TRANSIT SERVICE FOR COBB COUNTY TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996

$

896

FED SHARE$ 448

GA. SHARE$

0TH SHARE$ 448

,, ,,

'-
... ,,

.,, J

<..,

~

l!!!!I!!! ..,l.l!!!!!!!!!

~

~

~

~

~

~

-= ~ ~'

.. ~ BEi:lt~ ~;,:;,~ t(.ef::: ~:M

"'-

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 77

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

-----------------------------------------

----------------------------------CO-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

COBB

MULTIMODE, SHORT RANGE, FINANCIAL, FACILITIES, ETC. PLANNING

7D7504 SPECIAL STUDIES/ PLANNING

CONG DIST. 6

FUNDS RECIPIENT: COBB COUNTY MANAGER: STEVE KISH

FUND SOURCE: STATE FUNDS

PLANNING 1994

$ 576

FED SHARE$

461

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

57

0TH SHARE$

58

COBB 7V1013

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH

CONG DIST. 7 & 6

CAPITAL 1994

$

65

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

52

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

7

0TH SHARE$

7

COBB 7Vl014

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH

CONG DIST. 7 & 6

CAPITAL 1995

$

67

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

54

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

6

0TH SHARE$

7

COBB 7Vl015

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH

CONG DIST. 7 & 6

CAPITAL 1996

$

70

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

56

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

7

0TH SHARE$

7

COBB 62120X

SR 92 FM E OF SR 754 TO OLD MOUNTAIN PARK RD/CHEROKEE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.95 MANAGER: RAY METTS,

ATLANTA TIP f CH 20 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 621200 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY.

ROW 1995

$

0 ..

CONST 1996 $

0

FED SHARE $

GA. SHARE $

0TH SHARE $

COBB. 712750

WINDY HILL RELIEVER BRIDGE OVER I-75 (PHASE I) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.40 MANAGER: G. ROSS (C)

ATLANTA TIP f C0171 CONG DIST. 6
FUND SOURCE: SURFACE TRAN SP.ORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL
ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
5500 4400 1100

COBB 712752

WINDY HILL RELIEVER FM COBB PKWY TO THE I-75 BRIDGE; PHASE 2 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .70 MANAGER: G. ROSS (C)

ATLANTA TIP f CO 171

CONG DIST. 6

.

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW 1996 CONST

$ 1200 AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 78

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

C-O-B-B------E-A-S-T---W-E-S-T--C-O-N-N---IN-T-C-H---W-/-I--2--8-5--E

RAMPS

&-A--T-LA--N-TA-RD-

COMMENTS

YEAR

ESTS

BRID--G-E-,PH2------A-T-L-A-N-T-A---T-IP---t-c-o---R---7-0-------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

712760 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED.

CONG. DIST. 6.

ROW

AFTER 96

PROJECT MILEAGE : .00

CONST

AFTER 96

MANAGER: G. ROSS (CM)

FUND SOURCE: NAT'L HIGHWAY

FEDERAL. HIGHWAY ADMIN FUNDS

COBB 712800

KENNEDY INTERCHANGE@ I-75 (CONTRACT l);SEE 71Y800 FOR IM INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (C)

COBB 712804

KENNEDY INTERCHANGE I-75 IMPRV & AKERS MILL RELOC (CT 2)& NH
INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .OO - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (CM)

COBB 712890

I-75/SR 401 FM I-285 NORTH TO SR 5 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 8.38 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E. LAWS

COBB 71297Y

HOV LN SGN ON I-75 & I-85 METRO/CLAYTON;FULTON;GWINNETT
HOV LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

COBB 713020

I-20 FM W OF SIX FLAGS DR TOW OF SR 280 / & FULTON SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
r..

COBB 713060

I-285: SHOULDER REPAIR ADJ TO CONCRETE PAVING&FULTON-DEKALB
SHOULDER WORK/ MAINTENANCE PROJECT MILEAGE : 42.56 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: .

ATLANTA TIP f CO-R 78
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 71Y800 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CO-R 78
CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 138 CONG DIST. 6 .
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f R 73 CONG DIST. 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712970 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f AT-R 154 CONG DIST. 5
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71302X IS AN ASSOCIATED PROJECT.
ATLANTA TIP f R 130 CONG DIST. 5 & 4
FUNb SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

17007 13606
471 3872

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA, SHARE$ 0TH SHARE$

39855 35870
3986

PE NONE $ ROW.NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0 3687 2950
737

PE 1994 $

0

ROW NONE $.

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994

$

950

FED SHARE$

950

GA. SHARE $

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1994

$

580

FED SHARE$ 522

GA. SHARE$

58

0TH SHARE$

'.1

I !1

)

.....

,,

,, J

t:""'f

~

~

~ . ~ ,,

~

~

~=--=

~

ftifj

t:.~~ ~

r:tr::t:a

~U!~

!!if4K+.1!i

fi,i~~li!i

/i.::: '4ii"

.)~ l,~~-~~ '

~ . -......,,....... .
''
_.

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 79

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

C-O-B-B-------I--2-8-5--W--E-S-T-S-ID-E---52---S-IG-N--S--N-B--FR-O-M--

I-2-0---TO---I--7-5--.-.-. -FU-L-T-O-N--------------A-T-LA--N-T-AC-O-MT-MI-PE-N-IT-SR---1-3-0---------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--

0

71309X UNKNOWN/ UNKNOWN

CONG DIST. 6'

ROW NONE $

0

PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L, SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

713095 IS AN ASSOCIATED PROJECT.

0TH SHARE$

COBB

I-75 VAR LOCA FROM I-285 SOUTH TO BARRETT PKWY .. CLAY-FULTON

ATLANTA TIP IR 130

PE NONE $

0

71311Z PVMNT MARKINGS/ MAINTENANCE

CQNG DIST. 5

ROW NONE $

0

PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

713110 IS AN ASSOCIATED PROJECT.

0TH SHARE$

COBB

0
COMMUNICATION CABLE ON I-85 FM I-75 NORTH TO I-285

ATLANTA TIP IR 168

PE NONE $

0

71314X MISCELLANEOUS IMPROVEMENTS/ TRAFFIC

CONG DIST. 4 & 5

ROW NONE $

0

PROJECT MILEAGE : 10.00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: BURT RIDDLE

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

COBB 71Y800

KENNEDY INTERCHANGE@ I-75 -TO SHOW IM FUNDS; SEE 712800 INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10 MANAGER: G. ROSS (C)

ATLANTA TIP I CO-R 78 CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712800 IS AN ASSOCIATED PROJECT.

PE LOCL ROW 1994 $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

3500 4866 4379
487

COBB 71Y804

KENNEDY INTERCHANGE@ I-75 - TO SHOW NH FUNDS; SEE 712804 INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 10
MANAGER:

ATLANTA TIP I CO-R 78 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$
0TH SHARE$

4000 3200
800

COBB 720125

N'SIDE. PKWY@ CHATTAHOOCHEE RVR INCL APPR/& FULTON CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 6 LANES. PROJECT MILEAGE : 1.01 MANAGER: BEN BUCHAN (M)

(_

COBB 720468

SR 6/US 278@ CSX .RR 2.8 MI W/POWDER SPRINGS
BRIDGES/ REPLACEMENT PROJECT MILEAGE : .35 MANAGER: D. GODWIN

ATLANTA TIP I AT12/C024 CONG DIST, 5 & 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72Yl25 IS AN ASSOCIATED PROJECT.
ATLANTA TIP I CO 225
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 72Y468 IS AN ASSOCIATED PROJECT.

PE 1981 UNDERWAY ROW 1985 UNDERWAY CONST 1996 $ 2500
FED SHARE$ 2000 GA. SHARE$ 500 0TH SHARE$

PE 1993 UNDERWAY

ROW 1994 $

25

CONST 1995 $ 885

FED SHARE$ 708

GA. SHARE$ 177

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 80

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

---------------------------------------

--------------- --------------------C-O-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

SR 8/US 78 FROM DOUGLAS CO TO SR 5/INCL BR@ SWEETWATER CK

ATLANTA TIP f CO 7

PE 1986

UNDERWAY

721100 RECONSTRUCTION & WIDENING FROM 2 LANES T9 5 LANES.

CONG DIST. 7

ROW 1991 UNDERWAY

PROJECT MILEAGE : 1.60

CONST 1994

$ 4023

MANAGER: D. SMITH

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 3218

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

805

0TH SHARE $

COBB 721110

SR 8 FM W OF SR 139 TO RIVERVIEW RD (INCL SIGNALS"@ 4 INTER) RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 4.40 MANAGER: D. SMITH

ATLANTA TIP f CO 6

CONG DIST. 7

.

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 UNDERWAY

ROW 1989 UNDERWAY

CONST 1994

$ 8851

FED SHARE $ 7081

GA. SHARE $ 1770

0TH SHARE $

COBB 721150

SR 3/US 41/COBB PKWY FM AKERS MILL RD TO SPRING ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. PROJECT MILEAGE : .54 MANAGER: G. ROSS (C)

ATLANTA TIP f CO 80 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERALHIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1994

$ 2070

CONST 1996

$ 2130

FED SHARE $ 1704

GA. SHARE $

326

0TH SHARE $

100

COBB 721152

SR 3/US 41/COBB PKWY FM PACES MILL RD TO AKERS MILL ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES. PROJECT MILEAGE: .99 MANAGER: G. ROSS (M)

ATLANTA TIP I CO 231
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AFTER 96 AFTER 96

COBB 721250

SR 3/US 41/COBB PKWY FM SPRING RD N TO TERRELL MILL PHl,3 RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE: 1.69 MANAGER: G. ROSS (H)

ATLANTA TIP f CO 81
CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 1311 AFTER 96

COBB 721252

COBB PARKWAY FM S 120 LOOP TON 120 LOOP (PHASE 2) RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE : .69 MANAGER: G. ROSS (M)

ATLANTA TIP f CO 81 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96.

COBB 721256

COBB PARKWAY FM TERRELL MILL RD TO SOUTH 120 LOOP (PH 4,5) RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE : 3.01 MANAGER:G. ROSS (M)

ATLANTA TIP f CO 81 CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

,, f "

.,,

,..

l'

~

~

I!!!!!!,

~

~

~

~

~

~

. C~L:i_!i

li:!z:.n;$

~i:f~-'t

ft:.:~;:.--;~:

1:'..

:"''.,.;. :.....

~A,
.

\-~--,.:-<;-.,,
-.-:,.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 81

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COBB

SR 120/ROSWELL RD FM SR 120 LP TO PIEDMONT RD/MARIETTA

ATLANTA TIP f CO 177

PE 1996

$

80

721310 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

CONG DIST. 6

ROW

AFTER 96

PROJECT MILEAGE : 1.50

CONST

AFTER 96

MANAGER: D. SMITH (M)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

COBB 721670

S.MARS HILL EXT FM OLD US 278/SR6 BUS TO SR 120/DALLAS HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.44 MANAGER: D. SMITH (CM)

ATLANTA TIP f CO 123
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW 1996 CONST

$ 8000 AFTER 96

COBB 721680

SR 176/MARS HILL RD FRM SR 120/DALLAS HWY TO STILESBORO RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 4.35 MANAGER: D. SMITH (CM)

ATLANTA TIP f CO 24 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 6685 AFTER 96

COBB 721685

MARS HILL RD FM STILESBORO RD TO SR 3/COBB PARKWAY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.13 MANAGER: D. SMITH (CM)

ATLANTA TIP f CO 124 CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 4880 AFTER 96

COBB 721690

N.MARS HILL EXT FM SR 3/COBB PKWY TO I-75/BARTOW COUNTY
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.15 MANAGER: D. SMITH (CM)

ATLANTA rIP f CO 122
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY. ~.... ';,
AFTER 96 AFTER. 96

COBB 72Y125

"STP" FUNDING FOR 720125. NOT A REAL PROJECT. BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 1.00 MANAGER: BEN BUCHAN

COBB 72Y468

SHOWN FOR "BR" FUNDS ONLY .... SEE 720468 FOR PROJECT INFO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,00 MANAGER: UNKNOWN

ATLANTA TIP f AT12/C024 CONG DIST. 6 & 5 .
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 720125 IS AN ASSOCIATED PROJECT.
ATLANTA TIP t CO 225
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 720468 IS AN ASSOCIATED PROJECT.

PE 1993

UNDERWAY

ROW 1985 UNDERWAY

CONST 1996

$ 1000

FED SHARE $

800

GA. SHARE $

200

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

500

FED SHARE$

400

GA. SHARE$

100

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATIO~

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 82

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O-B-B------S-R---36-0-/M--A-C-L-A-N-D--R-D--F-M---SR---1-7-6--TO---PO-W--D-E-R--S-P-R-IN-G--S--R-D------------------A-T-L-A-N-T-A--T-I-P--f--C-O--3-9---------------------P-E--1-9-8-6-----U-N-D-ER-W--AY

730860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 6 & 7

ROW LOCL

PROJECT MILEAGE : 4.00

CONST 1994

$ 9477

MANAGER: G. 'ROSS

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 7582

FEDERAL-HIGHWAY ADMIN FUNDS

GA. SHARE$ 1895

0TH SHARE$

COBB 731020

SR 120 LOOP/N. MARIETTA. PARKWAY AT COLE STREET TURN LANES/ TRAFFIC PROJECT MILEAGE : .17 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: D. GODWIN

ATLANTA TIP f co234 CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW LOCL

<:;ONST 1994

$

94

FED SHARE$

85

GA. SHARE$

9

0TH SHARE$

COBB 751430

FRNTG RD 1-WY PAIR FM ROTTENWOOD CK TO NORTHSIDE DR/FULTON RECONSTRUCTION & -WIDENING. NO LANE ADDITION PROPOSED.'.
PROJECT MILEAGE : 1.70 MANAGER: D. SMITH (M)

ATLANTA TIP f CO-R 67 _CONG DIST. 6 & 5
FUND SOURCE_: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

COBB 751670

CR 2845/BELLS FERRY RD FM I-575 N TO CHEROKEE CL/INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.90 MANAGER: H. ASHMORE

COBB 751675

SHILOH RD REALIGNMENT WITH SHALLOWFORD RD@ BELLS FERRY RD INTERSECTION IMPROVEMENT/ RECST. OR REHAB. PROJECT MILEAGE: .43 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: H. ASHMORE (C)

COBB 751890

SR 176@ SR 6 BUS & MACEDONIA RD INCLU UPGRADE SIGNALS

INTERSECTION IMPROVEMENT/ TRAFFIC

.

PROJECT MILEAGE : .38 - EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: D. GODWIN

COBB 752220

SR 6BU/ELLIOTT RD OVER POWDER SPRINGS CRK W OF POWDER SPS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED-LANES. PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP f CO 71 CONG DIST. 6 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CO 136 CONG DIST. 6 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA. TIP f CO 227 CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I CO 247
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW LOCL

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
3631 2905
726

PE NONE $

0

ROW LOCL

!,'.!ONST 1994

$

357

FED SHARE$ 286

GA. SHARE$

71

0TH SHARE$

PE NONE $

0

ROW 1993 UNDERWAY

CONST 1994

$

403

FED SHARE$

363

GA. SHARE$

40

0TH SHARE$

PE 1995 ROW CONST

$

16

AFTER 96

AFTER 96

:,

<i

!

It '

., ...

~

~

~

~

.

'It

~

~

M~

~

~

~ ~Lli!'II
,:.

~~

t:;:.";~;,;~

~fo-'~

~;,;;,j

~-, l'.1." ~_-!i

r: ::
. ~...

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 83

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O-B-B-------SR---6-B-U-S--R-E-A-L-I-G-N-M-E-N-T---W-IT-H---B-R-O-W-N-S-V-I-L-L-E--R-O-A-D------------------------A-T-L-A-N-T-A--T-I-P--f--C-O--2-4-8--------------------P-E--1-9-9-4-----U-N-D-ER-W--AY

752260 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 7

ROW LOCL

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST 1995 $ 210

MANAGER: D. GODWIN

FUND SOURCE: HWY. SAFETY

FED SHARE$ 189

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

21

0TH SHARE$

COBB 752310

OLD CANTON RD OVER SHEFFER CK TRIBUTARY/SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP t CO 246

CONG DIST. 6

.

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

12

ROW LOCL

CONST 1996 $ 802

FED SHARE$

642

GA. SHARE$ 160

0TH SHARE$

COBB 770262

CR 133/HOLT ROAD AT SOPE CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP t CO 242
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994 $ 465

FED SHARE$

372

GA. SHARE$

93

0TH SHARE$

I

COBB 770263

CR 257/KURTZ ROAD OVER NOONDAY CREEK

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE: ,00

MANAGER:

r..

ATLANTA TIP t CO 244
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994 $ 455

FED SHARE$ 364

GA. SHARE$

91

0TH SHARE$

COBB . 770264

CR 822/BURNT HICKORY ROAD OVER ALLATOONA CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: ,00 MANAGER:

ATLANTA TIP t CO 243
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994 $ 522

FED SHARE$ 418

GA. SHARE$

104

0TH SHARE$

COBB 770291

CR 2793/QUEENS MILL ROAD OVER NICKAJACK CREEK REPLACEMENT OF THE EXISTING BRIDGES($). FROM 2 TO 3 LANES.
PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP t CO 241
CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

700

FED SHARE$ 560

GA. SHARE$ 140

0TH SHARE$

COBB 770350

OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER:

ATLANTA TIP t CO 239
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

5

AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPT.ION

P. I.NO.

PROJECT DATA

COBB

HIRAM RD/CR 2081 OVER POWDER SPRINGS CREEK

COMMENTS

ATLANTA

TIP

f

----------
CO 245

770360 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 7

PROJECT MILEAGE: .00

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY AD~IN FUNDS

16-Sep-1993 Page 84

FISCAL

COST

YEAR

ESTS

----- .---------------------

PE 1995

$

5

ROW LOCL

CONST

AFTER 96

COBB 770370

FRIENDSHIP CHURCH RD/CR 942 OVER MUD CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER:

ATLANTA TIP f CO 240

'CONG DIST. 6

.

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

5

AFTER 96

COBB 770470

HISTORIC DEPOT RENOVATION IN KENNESAW ANO WALKWAYS MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

COBB 770601

TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN COBB COUNTY
SIGNALS/ TRAFFIC PROJECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

COBB 770635

6 COBB COMMUNITY TRANSIT BUSES EQUIP. PURCHASE / CAPITAL PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

1.

COBB

DECK OVERLAYS FOR SIX BRIDGES IN DISTRICTS 7 & 3

811040 BRIDGES/ RECST. OR REHAB.

PROJECT MILEAGE : .00

MANAGER: UNKNOWN

COBB 810040

DECK OVERLAYS FOR SIX BRIDGES IN DIST 7,3; TO SHOW STP FUNDS
BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: UNKNOWN

ATLANTA TIP f CO 237
CONG DIST. 6 FUND SOURCE: TRANS. ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t CO 249
CONG DIST. 6 ,- 7 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CO-R 163 CONG DIST. 6 &- 7 FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST, 6 & 7 FUND SOURCE: I-STATE HAINT. FEDERAL HIGHWAY ADMIN FUNDS 810040 IS AN ASSOCIATED PROJECT.
cqNG DIST. 6: & 7 FUND SOURCE:- SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 811040 IS AN_ASSOCIATEO PROJECT.

PE LOCL

ROW LOCL

CONST 1996 $ 156

FED SHARE$ 125

GA. SHARE$

0TH SHARE$

31

PE 1994

$

50

ROW NONE

$

0

CONST 1995

$

950

FED.SHARE$ 760

GA. SHARE$

0TH SHARE$

190

PE NONE $ ROW NONE $ CONST 1995 $'
FED SHARE$ GA. SHARE$
0TH SHARE$

0 0 1320 1056
264

PE NONE $

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 1497 1347
150

PE_ NONE $

0

ROW NONE $

0

CONST 1994

$

363

FED SHARE$ 290

GA. SHARE$

73

0TH SHARE$

. . (. ..

,,

,.... ' ~

~

== @.iB ~ , ~ ,, ~

== . : : i

=~ --~

~ -~ ~-a Fii>~

~

~~~

tf~,~~

j,:,-,~)

-~ ,,.::1

l

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 85

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COFFEE SR 135/ US 221/ IN DOUGLAS@ SEVENTEEN MILE RIVER

PE 1986 UNDERWAY

421240 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5 LANES.

CONG DIST. 8

ROW NONE $

0

PROJECT MILEAGE : .20

CONST 1995 $ 1656

MANAGER: J. LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 1325

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

331

421320 IS AN ASSOCIATED PROJECT.

0TH SHARE$

COFFEE 421320

SR 135 FM SR 32/DOUGLAS NE TON DOUGLAS BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 3.10 MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421240 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW LOCL

CONST 1995 $ 2748

FED SHARE$ 2198

GA. SHARE$

550

0TH SHARE$

COFFEE 421340

SR 32/DOUGLAS FM W CL TOE/SR 206 .. INCL 1-WAY PAIR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 3.57 MANAGER: M. REYNOLDS

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 431280 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY ROW 1994 $ 2780 CONST 1995 $ 4402
FED SHARE$ 3522 GA. SHARE$ 880 0TH SHARE$

COFFEE 421345

SR 32 FM W/CR 296 EAST TO WEST CITY LIMITS OF DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.13 MANAGER: M. REYNOLDS(CM)

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY $ 3289 AFTER 96

COFFEE 42134X

SR 32@ 2 LOC/IRWIN & 2 LOC/COFFEE ... SEE IRWIN COUNTY
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LINDSEY

COFFEE 422250

SR 31/US 441@ MILL CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .10 MANAGER: J. GRAYBEAL

COFFEE 422350

SR 135 AT MCDONALD ROAD IN DOUGLAS

TURN LANES/ TRAFFIC

PROJECT MILEAGE : .OO - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

r..

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421343 IS AN ASSOCIATED PROJECT.
CONG DIST. 8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421910 IS AN ASSOCIATED PROJECT.
ALBANY TIP f H/R-2 CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0.

ROW 1993 UNDERWAY

CONST 1994

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

PE 1994

$

9

ROW 1995 $

10

CONST 1996 $ 289

FED SHARE$ 289

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 86

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O--F-FE-E----S-R---1-3-5-@---IN-T-E-R-S-E-C-T-I-O-N--O--F--CR---5-7-9-; --C-R--1-4-6-; --C-R--1-4-8----------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY

431250 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 2

ROW 1994 $

3

PROJECT MILEAGE : 1.00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1995 $ 383

MANAGER: J. LINDSEY

FUND SOURCE: HWY, SAFETY

FED SHARE$ 345

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

38

0TH SHARE$

COFFEE 431280

LANDSCAPING/ST SCAPE MASTER PLAN DWTOWN DOUGLAS (421340)

LANDSCAPING/ ENHANCEMENT

PROJECT MILEAGE : ; 50 - EXIST. LANES: 0 /PROPOSED LANEiS.: 0

MANAGER: M. REYNOLDS (C)

.

CONG DIST. 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS 4Z1340 IS AN ASSOCIATED PROJECT.

PE LOCL

ROW NONE $

CONST 1994

$

FED SHARE$

GA. SHARE $

0TH SHARE$

0 1520 1216
366 670

COFFEE 442470

SR 31/US 441@ MCNEAL DR/CHESTER AVE
TURN LANES/ TRAFFIC PROJECT MILEAGE : ,14 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LINDSEY

CONG DIST. 8 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1994 $ 146

FED SHARE$ 131

GA. SHARE$

15

0TH SHARE$

COFFEE 442600

SR 158 AT SHIRLEY AVENUE IN DOUGLAS TURN LANES/ TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 8
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

9

ROW 1994 $

10

CONST 1995 $ 289

FED SHARE$ 289

GA. SHARE$

0TH SHARE$

COFFEE 450380

SR 206/PERIMETER RD FM SR 32 TO SR 31 IN DOUGLAS RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.72 MANAGER: J. LINDSEY (M)

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY

$

50

AFTER 96

\



,,

1f",....

,, 'I

D!!!IJ

lffll!!'!!!

. l. l!!M ~ ~

e..M!!

P-i\J

~
=ill

ffil~

~

E@Xff.f,l

.~~~~

H~

~,:-::ii

:~::.~-~

(',:-;<c;;cl

. ~""2i-i~ -.

~~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 87

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-,N--O-.----------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-STS
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE

4B1407 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 8 & 2

FUNDS RECIPIENT: CITY OF MOULTRIE

OPERATING 1994 $

37

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

23

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4Bl408 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH

CONG DIST. 8 & 2

OPERATING 1995 $

38

FUND SOURCE: RURAL TRANSIT

FED SHARE$

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4B1409 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH

CONG DIST. 8 & 2

OPERATING 1996 $

40

r_

FUND SOURCE: RURAL TRANSIT

FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

25.

GA. SHARE$

0TH SHARE$

15

COLQUITT SR 37/MOULTRIE FM OKAPILCO CRK TO SR 35 BYP
421840 TURN LANES/ TRAFFIC PROJECT MILEAGE : .60 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J, LINDSEY

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994 $ 675

FED SHARE $

675

GA, SHARE $

0TH SHARE $

COLQUITT SR 133: CSX RR OVER SR 133 0.3 MIN OF SQUARE IN MOULTRIE 422000 BRIDGE REMOVAL/ NEW CONSTRUCTION
PROJECT MILEAGE : 1,00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: J. LINDSEY

PE NONE $

0

CONG DIST. 2

ROW 1994 $

5

CONST 1994 $ 259

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 207

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

52

422005 IS AN ASSOCIATED PROJECT,

0TH SHARE$

COLQUITT SR 37: REMOVE SAG@ OLD CSX RR WEST OF SQUARE IN MOULTRIE 422005 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .75 MANAGER: J. LINDSEY

PE NONE $

0

CONG DIST. 2

ROW NONE $

0

CONST 1994 $ 119

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

95

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

24

422000 IS AN ASSOCIATED PROJECT.

0TH SHARE$

COLQUITT SR 37/W. CENTRAL AVE@ 11TH ST NB&SB IN MOULTRIE & SIGNALS 442490 TURN LANES/ TRAFFIC
PROJECT MILEAGE : .SO - EXIST, LANES: 2 /PROPOSED LANES: 3 MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1994 $

5

CONST 1994

$

125

FED SHARE$ 113

GA. SHARE$

13

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY.1996

16-Sep-1993 Page 88

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

--------------------------------------------------------------------------------------------- .----------------------- -.-----------

COLQUITT CR 477/COOL SPRINGS RO @ INDIAN CK 2 MI NE OF MOULTRIE

PE NONE $

0

442670 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.

CONG DIST. 2

ROW LOCL

PROJECT MILEAGE : .19 MANAGER:

..

CONST 1996 $ 104

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

83

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

21

0TH SHARE$

COLQUITT CR 235/JAMES KING RO@ BRIDGE CREEK 470685 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .16 MANAGER: J. LINDSEY
(

CONG [?IST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL-HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994 $ 232

FED "SHARE$ 186

GA. SHARE$

46

0TH SHARE$

,

I
,, ~ .

:-.

.~

. ,

,1

(!'!!!ft

~

~ ~
lfJ ,,..

~

~

-"'-'"'

~l

~ ==

~~
'

!'.fl?Y:Ci
"

~

~.,C6t~

f;~-_.~

~~!-~

..~?4i

(... , .. ~-.:-
I)~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 89

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P .I.NO.

PROJECT DATA

COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE

COMMENTS

YEAR

ESTS

--- --------- ---------------------.----------------------

2Bl098 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 10

FUNDS RECIPIENT: COLUMBIA

OPERATING 1994 $

45

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

27

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

19

COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl099 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1995 $

47

FUND SOURCE: RURAL TRANSIT

FED SHARE$

28

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

19

COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll00 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1996 $

49

FUND SOURCE: RURAL TRANSIT

FED SHARE$

29

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

20

COLUMBIA ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
2C2098 TRANSIT FACILITIES./ CAPITAL FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

. FED SHARE $:

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

COLUMBIA ONE STANDARD VAN AND ONE MOBILE RADIO 2C2099 TRANS.IT FACILITIES / CAP ITAL
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

COLUMBIA I-20@ WHEELER RD/SEE RICHMOND CO 21049X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: NEIL DAVIS
r.
COLUMBIA I-20: REST AREA 162,163; 152, 153 IN MORGAN CO. 21056X REST AREA/ RECST. OR REHAB,
PROJECT MILEAGE : ,00 - EXIST, LANES: 2 /PROPOSED LANES: 4 MANAGER: UNKNOWN

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 210490 IS AN ASSOCIATED PROJECT.
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL.. HIGHWAY ADMIN FUNDS 210560 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

PE NONE $

0

ROW NONE $

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION. STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 90

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O--LU--M-B-IA---SR---2-3-2--W-B--M-P--2-.5---3.-6-;-E-B---3-.6---5-.0;WB -4-.2-5---6-.-9-/-IN--C-L---C-LV-T--------------A-U-G-U-S-T-A--T-IP---f--G-I-0-0-6---------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

221410 ADDITION OF A PASSING LANE.

CONG DIST. 10

ROW 1993 UNDERWAY

PROJECT MILEAGE: 2.40

CONST 1994

$ 2800

MANAGER: D_- GRIFFITH

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 2240

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

560

0TH SHARE $

COLUMBIA SR 10/US 78 FM UCHEE CRI< E/CR 258 TO SR 223/RICHMOND CO 221790 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.10 MANAGER: BILL MOSKAL

AUGUSTA TIP f RC-004 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

67

$

70

AFTER 96

COLUMBIA SR 104 FM MP 11.95 S/CR BO .TO SR 47@ POLLARDS CORNER 221800 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.96 MANAGER: D. GRIFFITH
COLUMBIA SR 104 FM MP B.95 S OF CR 515 TO MP 11.95 S OF CR BO 221805 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.00 MANAGER: UNKNOWN

CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
AUGUSTA TIP f CC-076 CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY.ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

PE 1992 ROW 1995 CONST

UNDERWAY $ 1392 AFTER 96

COLUMBIA SR 28/FURYS FERRY RD FM RIVERWATCH PKWY TO CR 98/RICHMOND 221860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.11 MANAGER: D. CHURCH (M)

AUGUSTA TIP f RC-CC-048 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 2164 AFTER 96

COLUMBIA SR 28/FURY'S FERRY RD@ BASTON RD/VAUGHN RD 222230 INTERSECTION IMPROVEMENT/ RECST. OR REHAB.
PROJECT MILEAGE : .43 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: D. CHURCH (C,M)
COLUMBIA SR 47 SB FRM MP 2.45 NEAR KEG CREEK SOUTH TO MP 3.88 231350 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 1.43 ~AGER:

AUGUSTA TIP f CC-048
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW 1993 UNDERWAY.

CONST 1994

$ 2443

FED SHARE $ 1954

GA. SHARE $

489

0TH SHARE $

PE 1995 ROW CONST

$

23

AFTER 96

AFTER 96

,, ,.. ~

'-

.,



I~

~

,. = ~

~


., ~

~ ~

~~

~~~l~

=~,;;J:i

~

r15~i!!l~

~i~,,.~

k~,#,

~~i~f.fu

j'; ..-~:

f .. :...

..~~---,r"~

t).\

GEORGIA DEPARTME;~lT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 91

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO.

PROJECT DATA

----- -------------

----------

----------------------------------CO-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--

COLUMBIA SR 104/WASHINGTON RD@ CLUB CAR DRIVE (COMMERCIAL DRIVE)

AUGUSTA TIP f CC-076

PE 1994 UNDERWAY

231370 INTERSECTION IMPROVEMENT/ TRAFFIC

.

CONG DIST. 10

ROW LOCL

PROJECT MILEAGE : ,90 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D. GRIFFITH

FUND SOURCE: HWY. SAFETY

CONST 1995

$

670

FED SHARE$

603

FEDERAL'HIGHWAY ADMIN FUNDS

GA. SHARE$

67

0TH SHARE$

COLUMBIA SR 383/BELAIR RD FM FT GORDON GATE TO I-20/SEE RICHMOND CO 25032X RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : ,33 MANAGER: D, CHURCH

AUGUSTA TIP f RC-CC-207 CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 250320 IS AN ASSOCIATED PROJECT.

PE NONE $

0

ROW 1993 UNDERWAY

CONST 1994

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

COLUMBIA CR 145 FM CR 209 TO BASTON; NEW LOC FM OWENS TO OLD EVANS 250470 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.82 MANAGER: D. CHURCH (M)

AUGUSTA TIP f CC-7063 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

COLUMBIA CR 145 FM BASTON TO RIVERWATCH PK;BASTON FM SR 104 TO CR 145 250475 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : ,40 MANAGER: D. CHURCH

AUGUSTA TIP f CC-7063 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

COLUMBIA SR 104 FM CR 91/SCOTTS WAY NW TOE/CR 515 (INCL BRIDGES) 262080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.21 MANAGER: UNKNOWN

AUGUSTA TIP f CC-076 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

COLUMBIA CR 136/BASTON RD FM CR 145 N TO SR 28/MARTINEZ 262410 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .72 MANAGER: D. CHURCH
COLUMBIA DAVIS RD EXT FM WASHINGTON RD TO MARTINEZ BLVD 262490 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : .06 MANAGER: D. GRIFFITH

AUGUSTA TIP f CC-7006 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
. AUGUSTA TIP f CC-7006 CONG DIST, 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993

U~DERWAY

.-

ROW LOCL

CONST 1995 $ 3073

FED SHARE$ 2458

GA. SHARE $:> 615

0TH SHARE$

PE 1992 UNDERWAY ROW 1995 $ 1995 CONST 1996 $ 3502
FED SHARE $ 2802 GA. SHARE $ 700 0TH SHARE $

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$

505

FED SHARE$

404

GA. SHARE$

101

0TH SHARE$

PE 1995 ROW LOCL CONST

$

12

AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 92

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COLUMBIA KATHERINE STREET AT CSX RAILROAD . t279476X

PE NONE

$

0

270920 RR XING / TRAFFIC

CONG DIST. 10

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

90

MANAGER: W HESTER

FUND SOURCE: HWY. SAFETY

FED SHARE$

81

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

9

0TH SHARE$

,, ...

'

...

t

l -~

rn!!l'!!ffl

l!!ffl l!ffl!!I ~

1,1

J

1e

~

~

M1ffilti1

~~

~

,, IlQ.:,aa..-=;:;c:JI

~ ...

~~ttt~

j:0'.:.:::~~

....~ /:":-::~~::~ p,w1
I

"'--'

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 93

PROJECT LISTING.BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O-O-K-------I --7-5-@ ---S-R--3-7-/-A-D-E-L---[F-M---1-5-0-0--F-T--W-E-S-T--TO---6-5-0--F-T--E-A-S-T--I-- 7--5-) --------------------------------------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

410420 INTERCHANGE/ RECST. OR REHAB.

CONG DIST. 8

ROW 1995

$

100

PROJECT MILEAGE : .40 - EXIST. LANES: 2 /PROPOSED LANES: 5

CONST 1996 $ 3071

MANAGER: RON BRAZIEL

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 2764

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

307

0TH SHARE $

COOK 410510

I-75 FM LOWNDES CO LINE TO SR 37 RECONSTRUCTION & WIDENING FROM 3 LANES TO 6 LANES.
PROJECT MILEAGE : 7.75 MANAGER: H. ASHMORE(M)

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

COOK 410520

I-75 FM SR 37 TO CR 246 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 9.30 MANAGER: H. ASHMORE(M)

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

COOK 410530

I-75 FM CR 246/COOK TO CR 204 IN TIFT COUNTY RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 10.23 MANAGER: H. ASHMORE(M)

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AF-TER 96

COOK 410600

I-75 IMPROVE SANITATION, PARKING & LIGHTS@ REST AREAS 16&7 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER:

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

ROW 1994

$

CONST 1995 $

FED SHARE$

GA. SHARE$

0TH SHARE $.

500 2
1783 1605
178

'

COOK

SR 37/ADEL FM 600' E/I-75 'EAST TO PARRISH ST

421780 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

PROJECT MILEAGE : .99

MANAGER: RON BRAZIEL

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1992

UNDERWAY

ROW 1995

$ 3110

CONST 1996 $ 1702

FED SHARE$ 1362

GA. SHARE$

340

0TH SHARE$

r_-

COOK 431430

SR 7 AT NORFOLK SOUTHERN RAILROAO .. f723363R
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: ff.HESTER

CONG DIST:. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE

$

0

CONST 1994

$

79

FED SHARE$

71

GA. SHARE$

8

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FYl994/FY 1996

16-Sep-1993 Page 94

COUNTY

DESCRIPTION

P.I.NO.

PROJECT DATA

----------- ---- -- COOK

- CR 59 AT NORFOLK SOUTHERN RAILROAD .. f723177P

.

470980 RR XING / TRAFFIC

PROJECT MILEAGE,: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: W HESTER

,

.

FISCAL

COST

--- -------CO-MME-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PE NONE $

0

CONG DIST. 8

ROW NONE

$

0

CONST 1994

$

90

FUND SOURCE: HWY. SAFETr

FED SHARE$

81

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

9

0TH SHARE$

/

(.

. ~

. ,

1

' ~

. ~

''

~

~

~ ~

.,

J

!.,

~

~j

lt!'.;;~ff ~

~

Eri'iff,~ "

~~ .,

~~

t(&.:':~~

1.. .-:---S:

I.>;-;;~;,;"

t-;~.,,4Y::~


i-11

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 95

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P,I.NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O-W--E-TA----I---8-5--F-R-O-M--M--P --33--T-O--M--P --4-1 --IN-C--L--R-E-P-L--O-F--G-U-A-R-D-R-A-I-L----------------------------------------------------------P-E--1-9-9-3-----U-N-D-ER-W--AY

311600 RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 3

ROW NONE $

0

PROJECT MILEAGE : 8,00 - EXIST. LANES: 4 /PROPOSED LANES: 4

CONST 1994 $ 4821

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$ 4339

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

482

0TH SHARE$

COWETA 31171W

CALL BOXES ON I-85 FM ALABAMA TO SR 74/FULTON ... SEE HARRIS UNKNOWN/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 7 & 3
FUND SOURCE: I-STATE MAINT... FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

COWETA 321310

SR 16, US 27 ALT FM EVANS RD/CR 677 N TO NEWNAN BYPASS

RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. {.

PROJECT MILEAGE : 1.33



MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

683

FED SHARE$ 546

GA. SHARE$

137

0TH SHARE$

COWETA 321450

SR 14/ US 29A/ GREENVILLE ST@ A&WP RR BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : ,34 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1986 UNDERWAY ROW 1994 $. 309 CONST 1995 $, 1215
FED SHARE $'. 972 GA. SHARE$ 243 0TH SHARE$

COWETA 321850

SR 34_ FM NEAR WHITE OAK CRK E TOE/SR 154 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.80 MANAGER: J. GRAYBEAL

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1994
CONST

UNDERWAY $ 144'1 AFTER 96

COWETA 322060

SR 54/34 FM FISCHER XRDS TO SR54 . TO SR 74 .. FAYETTE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.79 MANAGER: M. REYNOLDS (M)

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY
AFTER 96 AFTER 96

COWETA 322063

SR 54@ LINE CREEK/ALSO FAYETTE CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .01 MANAGER: M. REYNOLDS

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 96

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

--- --- ---- P. I.NO.

PROJECT DATA

COWETA SR 34 E/NEWNAN FM SR 154 TO SR 54@ FAYETTE CO LINE

322340 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 4.11

MANAGER: M. REYNOLDS (M)

FISCAL

COST

-----------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PE 1992 UNDERWAY

CONG DIST. 3

ROW

AFTER 96

CONST

AFTER 96

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

COWETA 322345

SR 34@ SHOAL CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS (M)

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

COWETA . 322390

SR 34/NEWNAN FM SR 34 BYP TO I-85 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .71 MANAGER: M. REYNOLDS

COWETA 322400

SR 34 BYP/NEWNAN FROM SR 70/INCLUDE CSX RR BRIDGE TO SR 34

RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES. r-

PROJECT MILEAGE : 3.09

.

MANAGER: M, REYNOLDS (C)

CONG DIST: 3 FUND soyRcE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST .. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1994 $ 500 CONST 1995 $ 1264
FED SHARE $ 1011 GA. SHARE $. 253
0TH SHARE $

PE 1992 ROW 1995 CONST

UNDERWAY $ 2249 AFTER ,96

COWETA 331730

CR 555 OVER MESSIERS CREEK NORTH OF JCT SR 14 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)

COWETA 331920

CR 547/GORDON RD@ LITTLE WHITE OAK CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .57 MANAGER: GORDON BROWN

COWETA 332090

SR 74/85 AT KEG CREEK EAST OF SENOIA ADDITION OF A PASSING LANE. . PROJECT MILEAGE : .30 MANAGER:

CONG DIST, 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 33Y090 IS AN ASSOCIATED PROJECT.

PE LOCL

ROW LOCL

CQ_NST 1996 $ 137

. FED SHARE $ 110

GA. SHARE$

27

0TH SHARE$

PE 1992 UNDERWAY

ROW LOCL

CONST 1994 $ 341

FED SRARE $ 273

GA. SHARE$

68

0TH SHARE$

PE 1994 ROW 1996 CONST

$

10

$

5

AFTER 96


. '

. ..

~ ,,

-~

~

. ~

.,

~
,

~ ~-

lt'IK~

tfLJ.~W!,

~

~:~ # .,

~= r,,;:zyc'<'.;,

~~ti~

~';~i

r,::;::;:~

rt"'--'.':~:_-i

f""." ... -,~<:


., .

'1

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 97

PROJECT LISTING BY COUNTY FY 1994/FY 1996

I COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

C-O-W--E-TA----S-R--1-4-/-U-S--2-9--A-T--S-R---15-4-------------------------------------------------------------------------------------P-E--N-O-N-E-----$------0

332170 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 3

ROW 1996 $

58

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST

AFTER 96

MANAGER: GORDON BROWN (M)

.

FUND SOURCE: HWY. SAFETY

FEDERAL HIGHWAY ADMIN FUNDS

COWETA 332180

SR 16 AT SR 54 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST .. LANES: 2 /PROPOSED LANES: 4 MANAGER: GORDON BROWN(M)

CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE ROW 1996 CONST

$

0

$

21

AFTER 96

COWETA 33Y090

SR 74 / 85@ KEG CREEK EAST OF SENOIA/ FOR 118 FUNDS UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

COWETA 342830

CR 252/SMOKEY ROAD OVER MOUNTAIN CREEK OVERFLOW REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER:

COWETA 350640

SR 70.N/NEWNAN@ WAHOO CRK & LITTLE WAHOO CR~ REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .38 MANAGER: GORDON BROWN

COWETA 350980

SR 34 AT FIVE EXISTING MEDIAN OPENINGS TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: GORDON BROWN(M)
l

COWETA 370781

CR 157/ROCKAWAY RD IN SENOIA@ CSX RR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .30 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 332090 IS AN ASSOCIATED PROJECT.

PE 1994 ROW 1996 CONST

$

0

$

0

AFTER 96

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS.

PE LOCL

ROW LOCL

CONST 1996 $ 102

FED SHARE$

82

GA. SHARE$

20

0TH SHARE$

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1990 UNDERWAY

ROW 1992 UNDERWAY

CONST 1994

$ 1046

FED SHARE $ 837

GA; SHARE $ 209

0TH SHARE $

CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

18

$

1

AFTER 96

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL.HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995 $ 374

FED SHARE$ 299

GA. SHARE$

75

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 98

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. LNO.

PROJECT DATA

C-O-W--E-TA----C-R---1-34-/-T-O-P-E--R-O-A-D--O--V-E-R--P-IN--E--C-REEK

-------------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S-PE LOCL

370820 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 3

ROW LOCL

PROJECT MILEAGE : .25

CONST 1994

$

137

MANAGER: GORDON BROWN(C)

F.UND SOURCE: BRIDGE PROGRAM

FED SHARE$ 110

FEDERAL HIGHWAY ADMIN FUNDS

GA .. SHARE $

27

0TH SHARE$

COWETA 370825

CR 252/SMOKEY RD OVER MOUNTAIN CK NE OF CORINTH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994 $ 266

FED SHARE$ 213

GA. SHARE$

53

0TH SHARE$

COWETA 370828

CR 76 OVER LITTLE WHITE OAK CREEK SOUTH OF TURIN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)

CONG DIST. 3
FUND SOURCE:_BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

. 231
185 46

COWETA 370831

CR 160 OVER DEAD OAK CREEK SE OF SENOIA REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .25 MANAGER: GORDON BROWN(C).

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

226

FED SHARE$ 181

GA. SHARE$

45

0TH SHARE$

COWETA 370834

CR 122/TURKEY CK RD OVER TURKEY CREEK EAST OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C)

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LO.CL CONST 1994 $
FED SHARE$ GA. SHARE$
0TH SHARE$

. 185 148 31

COWETA 370910

CR 157@ LINE CRK & LINE CRK OFLW . . ALSO FAYETTE CO REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : 53 .
MANAGER: GORDON BROWN

CONG DIST. 3
FUND-SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 37091X IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY ROW LOCL
CONST 1994 $ 964 FED SHARE$ 771
GA. SHARE$ 193 0TH SHARE$

COWETA 370970

CR 336/WITCHER ROAD OVER WAHOO CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .25
MANA9ER:

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

352

FED SHARE$ 282

GA. SHARE$

70

0TH SHARE$

J

.~

.

,,

~

~

~ ~1~,

I)

,.,.

~~

~Jffil

==:r;:w

t~f~;:!~

~~

.. .. ,~~;~

~

Jittlij~

~\\".

r.f!f'~~;1,

1; ~-:: ~~ffi

..f;r.,.,,-)

~ ..

~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 99

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P-,-I-.-N-O--, ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

COWETA CR 261/CORNITH ROAD OVER SANDY CREEK TRIBUTARY

PE LOCL

370980 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES,

CONG DIST. 3

ROW LOCL

PROJECT MILEAGE : ,25

CONST 1994

$

197

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

158

FEDERAL HIGHWAY ADMIN FUNDS

GA, SHARE$

39

0TH SHARE$

COWETA 370990

CR 33/MAJOR ROAD OVER LITTLE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER:

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

115

FED SHARE$

92

GA. SHARE$

23

0TH SHARE$

COWETA 371000

CR 139/NEEDY ROAD OVER PINE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .25 MANAGER:

CONG DIST, 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

144

FED SHARE$ n5

GA. SHARE$

29

0TH SHARE$

(_

COUNTY P. I.No.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1208 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD MANAGER: STEVE KISH

( CONG DIST. 3 & 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOHIN FUNDS

16-Sep-.1993 Page 100

FISCAL YEAR

COST ESTS

OPERATING 1994 $

54

FED SHARE$

30

GA. SHARE $

0TH SHARE$

24

CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1209 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD
MANAGER: STEVE KISH

CONG DIST. 3 & 2

FUND SOURCE: RURAL TRANSIT

OPERATING 1995 $

63

FED SHARE$

35

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$

0TH SHARE$

28

CRAWFORD COUNTY OPERATED PUBLIC TRANSIT SERVICE 3B1210 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CRAWFORD
MANAGER: STEVE KISH

CONG DIST. 3 & 2

OPERATING 1996 $

65

FUND SOURCE: RURAL TRANSIT

FED SHARE$

36

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$

0TH SHARE$

29

CRAWFORD ONE STANDARD VAN ANO ONE MOBILE RADIO 3C2208 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CRAWFORD MANAGER: STEVE KISH

CONG DIST. 3 & 2

CAPITAL 1994

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

CRAWFORD SR 96/FALL LINE FWY@ FLINT RIVER TRIS 320955 REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .20 MANAGER: J. GRAYBEAL

CONG DIST. 3 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 363130 IS AN ASSOCIATED PROJECT.

PE 1991 UNDERWAY.

ROW NONE $

0

CONST 1996' $ 191

FED SHARE $ 153

GA. SHARE $

38

0TH SHARE $

CRAWFORD SR 42@ CULPEPPER CREEK W OF SR 7 331600 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

1.

CONST 1995 $ 366

FED SHARE $ 293

GA. SHARE $

73

0TH SHARE $

~

'

.'

~

~

., ~ '

~ ,..,,

~

~

-fill,~

~~;~ - ~

-,,,.._,,,,,,.., ~.,

)~

~ir;.::i.lil

j>>l:Mij

t~-.-:--c:,r:~

.~..;.-.:.~:..( ~

,, ;.t

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

CRISP 41025X

I-75 FM SR 159 NEAR ASHBURN TO SR 300@ CORDELE .. SEE TURNER RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .OO MANAGER: H. ASHMORE

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410250 IS AN ASSOCIATED PROJECT.

16-Sep-1993 Page 101

FISCAL YEAR

COST ESTS

PE 1987 ROW 1996 CONST

UNDERWAY

$

0

AFTER 96

CRISP 410260

I-75 FM 1 MILES OF CR 117 TO DOOLY CO LINE RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 7.13 MANAGER: H. ASHMORE

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY_ FEDERAL HIGHWAY ADMIN FUNDS 410265 IS AN ASSOCIATED PROJECT.

PE 1986 UNDERWAY

ROW NONE $

0

CONST 1995 $ 10879

FED SHARE$ 8703

GA. SHARE$ 2176

0TH SHARE$

CRISP SR 30/US 280 MP EB 14.35-15.35; WB 17.0-18.5

PE 1992

UNDERWAY

420605 ADDITION OF A PASSING LANE.

CONG DIST. 8

ROW 1994

$

8

PROJECT MILEAGE : 2.50

(.

CONST 1995 $ 1006

MANAGER: J. LINDSEY

FUND SOURCE: NAT'L HIGHWAY

FED SHARE-$

805

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 201

0TH SHARE$

CRISP 422190

SR 257 NEAR CORDELE@ MIDWAY RD/CR 266 & CR 353 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY (M)

CONG DIST. 8
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

5

ROW 1995 $

3

CONST 1996 $ 547

FED SHARE$

547

GA. SHARE$

0TH SHARE$

CRISP 470841

CR 241@ GUM CREEK/LAKE BLACKSHEAR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994 $ 310

FED SHARE$

248

GA. SHARE$

62

0TH SHARE$

CRISP 471000

REHAB & RESTORE THE HISTORIC DISTRICT OF CORDELE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST; 8 & 2
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 $

6

ROW NONE $

0

CONST 1996 $

92

FED SHARE$

74

GA. SHARE$

1

0TH SHARE$

19

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 102

COUNTY

DESCRIPTION

FISCAL

COST

----- P. I.NO.

PROJECT DATA

DADE ---C-O-U--N-TY O-PE-R-A-TED PUBLIC---T-R-A-NSIT SERVICE

--------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

6B1343 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: DADE MANAGER: STEVE KISH

OPERATINGl994

$

23

FUND SOURCE: RURAL TRANSIT

FED SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

9

DADE 6Bl344

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE KISH

CONG DiST. 9

OPERATING 1995

$

23

FUND SOURCE: RURAL TRANSIT

FED SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

0 GA. SHARE$

0TH SHARE$

9

DADE 6Bl345

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE-KISH

CONG DIST: 9

OPERATING 1996 $

25

FUND SOURCE: RURAL TRANSIT

FED SHARE$

15

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

10

DADE 6C2343

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DADE MANAGER: STEVE KISH

/
C

DADE 610880.

I-24 FM TENNESSEE STATE LINE TO TENNESSEE STATE LINE GUARDRAIL/ MAINTENANCE PROJECT MILEAGE : .40 - EXIST. LANES: 4 /PROPOSED LANES: 4
MANAGER:

CONG DI~T. 9 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CHATTANOOGA-TIP I 23
CONG DIST. 9 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

CAPITAL 1994

$

31

FED SHARE$

25

GA. SHARE$

3

0TH SHARE $-

3

PE NONE $

0

ROW NONE

$

0

CONST 1994 $ 734

FED SHARE$

661

GA. SHARE$

73

0TH SHARE$

DADE 610940

I-24 FROM TENN STATE LINE TO TENN STATE LINE

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 9

PROJECT MILEAGE : 4.60 - EXIST. LANES: 4 /PROPOSED LANES: 4

MANAGER: L. SEABR09K

FUND.SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED.SHARE$
GA. SHARE$
0TH SHARE$

0 0 2300 2070 230

DADE 621230

SR 136/TRENTON FM CR 52 TO SR 58/US 11 INCL INTERCHANGE@ 59 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE: 1.00 MANAGER: H GANNAWAY

CONG DISJ. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y230 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1995

$

410

CONST 1996 $ 2617

FED SHARE$ 2094

GA. SHARE$ 523

0TH SHARE$

.' ...

~

~

~ ..=~

~,!:~

~:c:-E

= ~

=~ ,:;,~ , ~

1w1-..,.;::1;.;.:.,n,;-;,;;1,,

11.~,(K.~,

~:,~1~i

r~:"' :;

~~'.-: -

"

.. f!,4~:,S.,).";~'i

...

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 103

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ----------------P-R-O-J-ECT--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DADE

SR 136 FM CR 52 TO SR 58; TO SHOW IM FUNDS FOR INT WITH I-59

PE NONE $

0

62Y230 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 9

ROW 1995

$

100

PROJECT MILEAGE : .00

CONST 1996

$

500

MANAGER:

FUND SOURCE: I-STATE MAINT.

FED SHARE$

450

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

50

621230 IS AN ASSOCIATED PROJECT.

0TH SHARE$

DADE 630915

SR 136 E/TRENTON EB 6.4-7.2/EB 10.6-11.85/WB 10.6-11.85 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.05 MANAGER: BILL MCVEY

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$

147

CONST 1995 $ 1613

FED SHARE $ 1290

GA. SHARE $

323

0TH SHARE $

DADE 631070

BURKHALTER GAP RD EXT FM SR 189 TO CR 392/WALKER [& BR] CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: BILL MCVEY (M)

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

(-

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 104

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO,

PROJECT DATA

--------------------------------------

---------------------------------------CO--M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DAWSON SR 9 FM SR 53 TO NEAR CR 54;SR 53 FM S/CR 167 TO CS 501

PE 1993 UNDERWAY

122040 TURN LANES/ TRAFFIC

CONG. DIST. 9

ROW LOCL

PROJECT MILEAGE : 1.00 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST

AFTER 96

MANAGER: L. OWENS (M)

FUND SOURCE: HWY. SAFETY

FEDERAL HIGHWAY ADMIN FUNDS

r_.

v

,. ,,_

. '

.. 1

~

~

~

~

~

~

~

r,:!i,-.i,!~

~!!!~

., ~ /""'':-, 4

'i, r ~.:.ij

1,::..,

}~::~ r y,~,

r;~ r . .~1;

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

DECATUR 431050

SR 309@ BIG SLOUGH CREEK EAST OF SR 97 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .50 MANAGER: J. LINDSEY

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

~ -...~~

..

!

16-Sep-1993 Page 105

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1994

$

5

CONST 1995

$

409

FED SHARE $

327

GA. SHARE $

82

0TH SHARE $

(

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-;-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 106

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

'

----------------------------------------------------------------------------------

DEKALB TRANSIT TRAVELER DEMONSTRATION PROJECT

7D701X TRANSIT PROJECTS/ CAPITAL

CONG DIST. 5

FUNDS RECIPIENT: CITY OF ATLANTA

CAPITAL 1994

$

0

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

DEKALB 7V1016

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY MANAGER: STEVE KISH

(-

CONG DIST. 4 & 11

CAPITAL 1994

$ 100

YUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

80

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

10

0TH SHARE$

10

DEKALB 7V1017

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH

CONG DIST. 4 & 11

CAPITAL 1995

$ 104

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

83

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

11

0TH SHARE$

10

DEKALB 7Vl018

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH

CONG DIST. 4 & 11

CAPITAL 1996

$ 107

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

86

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

10

0TH SHARE$

11

DEKALB 710323

BIKE/PEDESTRIAN WAY - MORELAND AVE TO STONE MTN PARK BICYCLE/PED. FACILITY/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: G. BOULINEAU

ATLANTA TIP f DK 121 CONG DIST. 4 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL
ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
1920 1536
64 320

DEKALB 712120

REDAN RD BR WON OVER I-285 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .20 MANAGER: BILL MOSKAL

ATLANTA TIP f DK-R 35 CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL
CONST

UNDERWAY AFTER 96

DEKALB 712450

I-285@ ST MT FWY;L'NCEVILLE HWY; BTWN US 78 & L'NEVILLE HWY
RAMP/ NEW CONSTRUCTION PROJECT MILEAGE : .94 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BILL MOSKAL

ATLANTA TIP f DK-R 107 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 71Y450 IS AN ASSOCIATED PROJECT. -

PE 1989 UNDERWAY ROW 1990 UNDERWAY CONST 1994 $ 3509
FED SHARE$ 2807 GA. SHARE$ 702 0TH SHARE$

,. ,,.

,.

.' ,...

~

~

~

~

Ji?'J;,..oli;'d

li!-~'!IJ

~~Z.2~-~!J

-"""'o.,;

~~

fa~~~~~~


~Ltl

fX;:&;l(i

1:,,'"".,

i:" . ,,.,;

~v..--;,~-;-f


.,,

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

1 6 - s - - 1, - 1 9 9 3 Page 107

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

D-PE-K-.IA-.L-NB-O--. --I--2-0-@ ---L-I-T-H-O-N--IAP-R-O-IN-JED-CU-T-S-TD-RA-IA-TAL---BL-V-D------------------------------------A-T-L-A-N-T-CA-O-M.T-MI-PE-N-fT-S-R--5-9----------------------P-EY-E-A1-R9-9-3-----U-NE-DS-TER-SW--AY

712870 INTERCHANGE/ NEW CONSTRUCTION

CONG DIST. 11

ROW 1995 $ 5840

PROJECT MILEAGE : .40 - EXIST. LANES: 0 /PROPOSED LANES: 4

CONST 1996 $ 2027

MANAGER: G. ROSS

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE $ 1622

FEDERAL HIGHWAY ADHIN FUNDS

GA, SHARE $

405

71Y870 IS AN ASSOCIATED PROJECT.

0TH SHARE $

DEKALB I-285 FM MP O - 21; MP 31.3 - 46.9; MP 56.2-62.7;SEE FULTON

ATLANTA TIP f R 130

PE NONE

$

0

71300X UNKNOWN/ UNKNOWN

CONG DIST. 5

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

0

MANAGER:

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

713000 IS AN ASSOCIATED PROJECT,

0TH SHARE$

DEKALB 71307X

I-285 EB 49 SIGNS FM JONESBORO RD TO GLENWOOD RD ... FULTON
SIGNING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK

ATLANTA TIP f R 130

PE NONE

$

0

CONG DIST. 5 & 6

ROW NONE $

0

CONST 1994

$

0

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

713075 IS AN ASSOCIATED PROJECT,

0TH SHARE$

DEKALB 713100

COTILLIAN DR/SAVOY DR ONE-WAY PAIR ON EACH SIDE OF I-285 CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. PROJECT MILEAGE : 1.03 MANAGER:

ATLANTA TIP f DK 117 CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

116

FED SHARE$

104

GA. SHARE$

12

0TH SHARE$

DEKALB 71314Z

COMMUNICATION CABLE ON I-75 FROM I-85 NORTH TO I-285 .. FULTON

MISCELLANEOUS IMPROVEMENTS/ TRAFFIC

t

PROJECT MILEAGE : 5.00 - EXIST. LANES: 0 /PROPOSED LANES: 0

ATLANTA TIP f R 169 CONG DIST. 5 & 6

PE NONE

$

0

ROW NONE $

0

CONST 1994 $

0

MANAGER: BURT RIDDLE

FUND SOURCE: CONG HIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $. GA. SHARE$

0TH SHARE$

DEKALB 713200

I-285 FM INTERCHANGE@ I-20 E TO INTERCHANGE@ I-85 N
BARRIERS/ MAINTENANCE PR9JECT MILEAGE : ,00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ATLANTA TIP f R 130 CONG DIST. 4
FUND SOURCE: I-STATE CONST. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

165

FED SHARE$ 149

GA. SHARE$

17

0TH SHARE$

DEKALB 71Y450

I-285@ ST HT FWY:L'NCEVILLE HWY: BTWN US 78 & L'NEVILLE HWY
RAMP/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0
MANAGER:.BILL MOSKAL

ATLANTA TIP f DI<-R 107 CONG DIST. 4.
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712450 IS AN ASSOCIATED PROJE;CT,

PE 1989 UNDERWAY

ROW 1990 UNDERWAY

CONST 1994

$

250

FED SHARE $ 225

GA. SHARE $

25

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 108

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.
-------------------

PROJECT DATA
---

-------------------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DEKALB I-20@ LITH IND BLVD - SHOWN FOR REMAINING UNFUNDED CST$

ATLANTA TIP f R 59

PE NONE $

-0

71Y870 INTERCHANGE/ NEW CONSTRUCTION

CONG DIST; 11

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 4

CONST 1996 $ 5973

MANAGER: G. ROSS

.

-

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE$ 4778

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$ 1195

712870 IS AN ASSOCIATED PROJECT.

0TH SHARE $.

DEKALB 721050

SR 124@ STONE MOUNTAIN CRK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .50 MANAGER: D. GODWIN
j

ATLANTA TIP f DK.99 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

DEKALB 721055

SR 124@ YELLOW RIVER/ ALSO GWINNETT CO

REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.

PROJECT MILEAGE : .03

.

MANAGER: RAY METTS (C/M)

ATLANTA TIP f DK 100 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

1

AFTER 96

DEKALB 72127X

SR 42/MACON HWY FM S/ANVILBLOCK RD TO OLD TONY RD/CLAYTON RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE: .00. MANAGER: M. REYNOLD~

DEKALB 721330

SR 124/ROCK CHAPEL RD FM UNION GR RD N TO PLEASANT HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .90 MANAGER: D. GODWIN

ATLANTA TIP f CL10/DK8 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721270 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 84 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1992 UNDERWAY

CONST 1996 $

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1993 ROW 1996 CONST

UNDERWAY $ 1481 AFTER 96

DEKALB 721350

SR 12/COVINGTON HWY FM SR 124 E TO TURNER HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.20 MANAGER: D. CHURCH (M)

ATLANTA TIP f DK 30 CONG DIST.- 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

DEKALB 721380

SR 857/ROCKBRIDGE RD FM SR 10/MEMORIAL DRE TO HAIRSTON RD

RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 2.20

.

MANAGER: .M. REYNOLDS (M)

r.

ATLANTA TIP f DK 25

CONG DIST. 4

.

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

:,

...

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

. .,

~

~

~

~

~~~

~~11.ll

~:m

~-m~

r,~1;~;:_i, . ~ . ~

~;,.~_'1',(1,

i';:-:"'./:N

l:i.:':

('~. ,Gd

... ~_,_.,.._V;:~

>

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 109

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DEKALB SR 857/ROCKBRIDGE RD FM HAIRSTON RD TO ST MTN-LITHONIA RD

ATLANTA TIP f DK 25

PE 1992

UNDERWAY

721390 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 4

ROW

AFTER 96

PROJECT MILEAGE : 1.90

CONST

AFTER 96

MANAGER: M. REYNOLDS (M)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 721400

ASHFORD-DUNWOODY/JOHNSON FERRY FM PTREE IND BLVD TO I-285 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.80 MANAGER: G. ROSS

DEKALB 721405

ASHFORD-DUNWOODY RD@ NANCY CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .02 MANAGER: G. ROSS

DEKALB 721530

SR 124 FM ROCKBRIDGE RD TO CENTERVILLE-ROSEBUD RD/GWINNETT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.10 MANAGER: RAY METTS (C/M)

ATLANTA TIP f DK 22

CONG DIST. 4 & 5

.

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

721405 IS AN ASSOCIATED PROJECT.

ATLANTA TIP f DK 22 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 721400 IS AN ASSOCIATED PROJECT.

ATLANTA TIP f GW 76 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

PE 1992 ROW 1996 CONST

UNDERWAY $ 6737 AFTER 96

DEKALB 721535

SR 124 FM PLEASANT HILL RD TO ROCKBRIDGE RD/ INCL CLVT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.92 MANAGER: D. GODWIN

ATLANTA TIP f DK 85 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 2327 AFTER' 96

DEKALB 721880

STONE MOUNTAIN FREEWAY AT HUGH HOWELL ROAD INTERCHANGE INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.20 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: NEIL DAVIS

DEKALB . SR 212/BROWNS MILL RD@ POLE BRIDGE CRK 730970 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES .
.PROJECT MILEAGE : .15
MANAGER: D. GODWIN

ATLANTA TIP f DK-R 117 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 98 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

10

CONST 1996

$ 3267

FED SHARE $ 2614

GA. SHARE $

653

0TH SHARE $

PE 1993 UNDERWAY

ROW 1994

$

10

CONST 1995

$

498

FED SHARE $

398

GA. SHARE $

100

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 110

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

------------------------- ----------

DEKALB REDAN RD@ SNAPFINGER CRK

---------- ------- -----A-T-L-A-N.-T-AC-O-MT-MI-PE-N-fT-S-R-T-P--D-K---2-3-----------------P-EY-E-A1-R9-9-2-----U-NE-DS-TER-SW--AY

751270 REHAB, OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.

CONG DIST . 4

ROW LOCL

PROJECT MILEAGE : .10 MANAGER: BILL MOSKAL

FUND SOURCE: BRIDGE PROGRAM

CONST

AFTER 96

r_

FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 751320

CR 5189/ROCKBRIDGE RD@ SNAPFINGER CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .28 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f DK 101 CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW LOCL CONST

UNDERWAY AFTER 96

DEKALB 751340

CR 23/FAYETTEVILLE RD@ SUGAR CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .50 MANAGER: D. GODWIN

DEKALB 751370

CHAMBLEE-TUCKER RD FM NEW P'TREE RD TO BUFORD HWY/SR 13 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.40 MANAGER: D. GODWIN

ATLANTA TIP f DK 111 CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 1 C_ONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGH.WAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 421

FED SHARE$ 337

GA. SHARE$

84

0TH SHARE$

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96'

DEKALB 751380

CHAMBLEE-TUCKER RD FM I-85 TO I-285 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.30 MANAGER: D.SMITH (C)

DEKALB 751440

WINTERS CHAPEL RD FM OAKCLIFF RD TON/CHICOPEE RD(& SIGNAL) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE.: .90 MANAGER: G. ROSS

DEKALB 751445

WINTERS CHAPEL-OAKCLIFF RD CONN@ SOUTHERN RR BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .08 MANAGER: G.ROSS

ATLANTA TIP f DK 17. CONG DIST. 4
FUND SOURCE: I-STATE CONST. FEDERAL.HIGHWAY ADMIN FUNDS
ATLANTA TIP f DK 44 CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 75Y440 IS AN ASSOCIATED PROJECT.
ATLANTA TIP f DK 94 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 751440.IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 5009
FED SHARE$ 4258 GA. SHARE$ 751 0TH SHARE.$

PE 1992 UNDERWAY

ROW LOCL CONST 1995

-'
$ 6609

FED SHARE$ 5287

GA. SHARE$ 1322

0TH SHARE$

PE 1992 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

....

... >

-~

-~

-==

~~

~

~

~

lffl~-4~5

~
"'-"''=-41

~

.......,;,,~
ln-'
.,-.

~-:- ,--._._~\

~:;7r,:::., ...:.-1

t:-:=T:~~~

~~~-it~

- ~~--..";:-".!



COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

16-Sep-1993 Page 111

FISCAL YEAR

COST ESTS

DEKALB 751490

SR 859/COOLEDGE-BROCKETT RD FM E PONCE DE LEON TO ST MTN FWY RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .30 MANAGER: D. GODWIN

ATLANTA TIP f DK 79 CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1996

$ 1307

FED SHARE $ 1046

GA. SHARE $

261

0TH SHARE $

DEKALB 751495

SR 859/COOLEDE-BROCKETT RD FM STONE MTN FWY-SR 8/W SIGNALS RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.00 MANAGER: D. GODWIN

ATLANTA TIP f DK 79 CONG DIST. 4 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$

42

AFTER 96

AFTER 96

DEKALB 751940

CR 5109/STEPHENSON RD@ CROOKED CRK

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .18

.

MANAGER: D. GODWIN

ATLANTA TIP f DK 97 CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 752100

EAST PONCE DE LEON AT RAYS ROAD INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .28 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN

ATLANTA TIP f DK102 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 752110

SR 154/MEMORIAL DRIVE@ WHITEFOORD AVE. INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .12 - EXIST. LANES: 3 /PROPOSED LANES: 4
MANAGER: D. GODWIN

ATLANTA TIP f AT 29 CONG DIST. 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 752470

SR 236 AT NORTHLAKE PARKWAY AND SIGNAL SYSTEM TURN LANES/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP f DK 119 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 752480

SR 155/CANDLER RD FM COLUMBIA/CLIFTON SPR TO SR 260 GLENWOOD
SIGNALS/ TRAFFIC PROJECT MILEAGE : 3.60 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

ATLANTA TIP f DK 120 CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1991

UNDERWAY

ROW LOCL

CONST 1995 $ 272

FED SHARE$ 218

GA. SHARE$

54

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1995

$

158

FED SHARE$

142

GA. SHARE$

16

0TH SHARE$

PE NONE $

0

ROW 1994

UNDERWAY

CONST 1994

$

91

FED SHARE$

82

GA. SHARE$

9

0TH SHARE$

PE 1994

$

7

ROW 1995 $

10

CONST 1996

$

231

FED SHARE$

208

GA. SHARE$

23

0TH SHARE$

PE NONE

$

0

ROW NONE

$

0

CONST 1994

$

384

FED SHARE$

346

GA. SHARE$

38

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 112

----------------------------------------------------------------- COUNTY
P. I.NO.

DESCRIPTION PROJECT DATA

DEKALB WINTERS CHAPEL RD FM OAKCLIFF RD TON/CHICOPEE RD (&SIGNAL)

COMMENTS ATLANTA TIP f DK 44

FISCAL YEAR
PE 1992

COST ESTS
UNDERWAY

75Y440 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

CONG DIST. 4

ROW LOCL

PROJECT MILEAGE : .00 MANAGER: G. ROSS

FUND SOURCE: OLD URBAN SYSTEM

CONST 1995 $

1

FED SHARE$

1

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

751440 IS AN ASSOCIATED PROJECT.

'0TH SHARE $

DEKALB 770280

CR 690/ALFORD RD@ CROOKED CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .25 MANAGER: D. GODWIN

ATLANTA TIP I DK 96
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1991 UNDERWAY

ROW LOCL

CONST 1994

$

220

FED SHARE$

176

GA. SHARE$

44

0TH SHARE$

DEKALB 770440

PEDESTRIAN/LANDSCAPING ALONG US 278 IN AVONDALE BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

l.

DEKALB 770480

SOUTH DECATUR TROLLY LINE CONVERSION BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : 00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

DEKALB 770530

D'TOWN ST'SCAPES IN DECATUR;SIDEWALKS,X-WALKS,BENCHES,TREES MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ATLANTA TIP f DK 114 CONG DIST. 4
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t DK 116
CONG DIST. 4 & 5
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP I DK 115
CONG DIST. 4
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1995 $

90

FED SHARE$

72

GA. SHARE$

0TH SHARE$

18

PE LOCL

ROW LOCL

CONST 1996

$

625

FED SHARE$

500

GA. SHARE$

0TH SHARE$

125

PE LOCL

ROW LOCL

CONST 1994

$

750

FED SHARE$

600

GA. SHARE$

0TH SHARE$ 150

DEKALB 770603

TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN DEKALB COUNTY
SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE

ATLANTA TIP f DK 118 CONG DIST. 4 & 11
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $'

ROW NONE $

CONST.1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

50 0
1108 886 1 221

DEKALB 770640

CR 299/N CLARENDON AVE AT CSX RAILROAO ... f279941U
RR XING / TRAFFIC PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: W HESTER

CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$-

0

ROW NONE $

0

CONST 1994

$

81

FED SHARE$

73

GA. SHARE$

8

0TH SHARE $

t

o

. '

~

-~

~~

=I C=-

~~

~

~mH~

f~l~i}';1~;

~~

1,~ . -~'~1

rt:~:fJ

~.:~

~i.l~

~~

~

"

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996
COMMENTS

DEKALB 770650

CR 899/LAREDO DR AT CSX RAILROAD ... f279944P
RR XING / TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER

CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

i~~~-~1
t

.,,

16-Sep-1993 Page 113

FISCAL YEAR

COST ESTS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

76

FED SHARE$

68

GA. SHARE$

8

0TH SHARE$

DEKALB 81104X

OVERLAYS FOR 013-0013,089,0089,119-0002,119-0040,139-0004
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 10 & 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

C .

I

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

Page 114

COUNTY

DESCRIPTION

--P-.I-.-NO--. ---

PROJECT DATA
--

DODGE COUNTY OPERATED PUBLIC TRANSIT SERVICE

FISCAL

COST

.

---- COMMENTS----------------------------Y-E-A-R--------E-S-T-S--

2Bll03 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 8

FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

OPERATING 1994 $

75

FUND SOURCE: RURAL TRANSIT

FED SHARE$

45

FEDERAL TRANSIT ADHIN FUNDS

GA. SHARE$

0TH SHARE$

30

DODGE 2Bl104

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

CONG DIST. 8

OPERAT-ING 1995 $

79

FUND SOURCE: RURAL TRANSIT

FED SHARE$

47

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

32

DODGE 2Bl105

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1996 $

84

FUND SOURCE: RURAL TRANSIT

FED SHARE$

50

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

34

DODGE 2C2103

ONE CONVERSION VAN, ONE STANDARD VAN, AND TWO MOBILE RADIOS
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

CONG DIST. 8

CAPITAL 1994

$

50

FUND SOURCE: RURAL TRANSIT.

FED SHARE$

40

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

0TH SHARE$

5

DODGE 2C2104

ONE CONVERSION VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

CONG DIST. 8

CAPITAL 1995

$

30

FUND SOURCE: RURAL TRANSIT

FED SHARE$

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

DODGE 221970

SR 87/US 23 /EASTMAN FROM NW OF CR 141 TO NW OF CR 332 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
PROJECT MILEAGE : .60 MANAGER: D. GRIFFITH

DODGE 231340

r . SR 27@ SR 87, SECOND AVE, SR 46 IN EASTMAN SIGNALS/ TRAFFIC PROJECT MILEAGE : .. 50 - EXIST. LANES: 3 /PROPOSED LANES: 3 MANAGER: BURT RIDDLE

CONG DIST. 8 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$

381

FED SHARE $ 305

GA. SHARE $

76

0TH SHARE $

PE NONE $

0

ROW 1994 $

5

CONST 1994 $ 150-

FED SHARE$ 150

GA .. SHARE $

0TH SHARE$

:t-

..

. .,

~

~

~

~

~

~

R21)W.:JJ

~~

~

j,,:;.~:-~li.l

1"&:'f':.i '(".-.::~,~~

li1~:~-~~1

1/rr:;:~~1~-~

~i<;~,j

~,i;.:,;.'-,:,._-:n;-,!

"



$'

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 115

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--, ----------------PR--O-JE-C--T--D-A-T-A------.---------------------------------------C-O-M--M-E-N-T-S---------------------------Y-EA--R--------E-S-T-S--
DOOLY CITY OPERATED PUBLIC TRANSIT SERVICE

3Bl218 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 2

FUNDS RECIPIENT: CITY OF VIENNA

OPERATING 1994

$

13

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

5

DOOLY 3B1219

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH

CONG DIST. 2

I

OPERATING 1995 $

13

FUND SOURCE: RURAL TRANSIT

FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

5

DOOLY 3B1220

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1996 $

13

FUND SOURCE: RURAL TRANSIT

FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

5

DOOLY 3B1422

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1994 $

32

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

19

GA. SHARE$

0TH SHARE$

13

DOOLY 3B1423

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1995 $

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

20

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

13

DOOLY 3B1424

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1996 $

34

FUND SOURCE: RURAL TRANSIT

FED SHARE$

20

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

DOOLY 3C2218

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH

CONG DIST . .2

CAPITAL 1994

$

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 116

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

D-O-O-L-Y-----O-N-E--C-O-N--V-E-R-SI-O-N--V-A-N--W--IT-H--L--IF-T--A-N-D--O--N-E-M--O-B-IL-E---R-A-D-IO--------------------------------------------------------------------------

3C2422 TRANSIT FACILITIES/ CAPITAL

CONG DIST. 2.

FUNDS RECIPIENT: CITY OF UNADILLA

CAPITAL 1994

$

32

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

DOOLY 3C2423

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH

CONG DIST. 2

CAPITAL 1995

$

20

FUND SOURCE: RURAL TRANSIT

FED SHARE$

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

DOOLY 311610

I-75 UPGRADE REST AREAS fl3 & 14(DOOLY) AND f 22 (MONROE) REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER:
L

CONG DIST. 2 & 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

ROW NONE $

CONST 1995 $

FED SHARE$

GA. SHARE$

0TH SHARE$

172
0 5730 5157
573

DOOLY 321610

SR 90@ SANDY MOUNT;LITTLE PENNAHATACHEE;TURKEY CK & TRIB REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PR0JECT MILEAGE : 1.20 MANAGER: GORDON BROWN

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1990 UNDERWAY

ROW 1995 $

32

CONST 1996 $ 173.4

FED SHARE$ 1387

GA. SHARE$ 347

0TH SHARE$

DOOLY 371210

CR 25 OVER HOGCRAWL CREEK 9 MI WEST OF UNADILLA REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. PROJECT MILEAGE : .21 MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

10

ROW LOCL

CONST 1996 $ 290

FED SHARE$ 232

GA. SHARE$

58

0TH SHARE$

,,



,-

. '



~

~

~ .. ~_i:~,

-=,.,..-_c;;,

r!'@.!!u~

~

tlfl.;t"'R!.J

r;;M"l'!,l

!.:." ..:::j

~--:f:1
"

,'~'~. ,'.~~.

:,T,J

l ' ' , ,.. ,.,.,:,

... """~~~-/

~-.~,,...~.
t

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 117

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O-.----------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DOUGHERT WHEELCHAIR LIFTS FOR PARATRANSIT VEHICLES (ADA)

401013 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 2 & 8

FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH

CAPITAL 1995

$

5

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

5

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

DOUGHERT WHEELCHAIR LIFTS FOR TRANSIT COACHES (ADA) 401015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 2 & 8

CAPITAL 1996

$

50

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

45

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

DOUGHERT CONCRETE REPLACEMENT FOR TRANSIT STATION 404010 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM. MANAGER: STEVE KISH

CONG DIST. 2 & 8

CAPITAL 1994

$ 166

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

133

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

16

0TH SHARE$

17

DOUGHERT VEHCLES, SHELTERS, FACILITY IMP., CAP. MAINT., ETC. 404011 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 2 & 8

CAPITAL 1995

$ 101

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

81

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

10

0TH SHARE$

10

DOUGHERT FACILITY IMP., CAP. MAINT., SHELTERS, FURNITURE, EQUIP., ETC

404012 TRANSIT PROJECTS/ CAPITAL

FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM

,

MANAGER: STEVE KISH

CONG DIST. 2 & 8

CAPITAL 1996

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

1527 1222
152 153

DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY
404016 TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DIST. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL'TRANSIT ADMIN FUNDS

OPERATING 1994 $ 780 FED SHARE$. 390 GA. SHARE$
0TH SHARE$ 390

DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY 404017 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH

CONG DI~T. 2 & 8
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ 717 FED SHARE$ 359
GA. SHARE $
OT~ SHARE$ 359

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 118

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--, -I.-N-O--, ---------------P-R-O-J-E-C-T-.-D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY

4D4018 TRANSIT PROJECTS/ OPERATIONS

CONG DIST. 2 & 8

FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM

OPERATING 1996 $ 737

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT

FED SHARE$

369

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

369

DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 4V1010 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH

CONG DIST. 8 & 2

CAPITAL 1994

$

20

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

16

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

OOUGHERT ELDERLY AND DISABLED VEHICLES ANO EQUIPMENT 4V1011 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA
MANAGER: STEVE KISH

CONG DIST, 8 & 2

CAPITAL 1995

$

21

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

17

FEDERAL TRANSIT.ADMIN FUNDS

GA, SHARE$

2

0TH SHARE$

2

DOUGHERT ELDERLY ANO DISABLED VEHICLES AND EQUIPMENT 4V1012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH
DOUGHERT SR 91/ PHILEMA RO IN ALBANY@ MUCKAFOONEE CREEK 421270 REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDEO LANES.
PROJECT MILEAGE :- .26 MANAGER: 0, CHURCH

CONG DIST. 8 & 2

CAPITAL 1996

$

22

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

ALBANY TIP I B-2
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421420 IS AN ASSOCIATED PROJECT.

PE 1986 UNDERWAY

ROW NONE $

0

CONST 1995 $ 1555

FED SHARE $ 1244

GA. SHARE $

311

0TH SHARE $

DOUGHERT PHILEMA RD FM SR 133 TO LEE CO LINE/EXCL BR@ MUCKAFOONEE CK 421420 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1,90 MANAGER: O. CHURCH (M)

ALBANY TIP I H/R-9
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421270 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY ROW LOCL
CONST 1995 $ 2408 FED SHARE$ 1926 GA. SHARE$ 482 0TH SHARE$

OOUGHERT SR 520/US 82/0GLETHORPE BLVD FM US 19 TO LOFTUS ST/ALBANY 421580 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : ,50 MANAGER: D. CHURCH

ALBANY TIP I HR/11
CONG DIST. 8
GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995 $ 946

FED SHARE $ 757

GA. SHARE $

189

0TH SHARE $



,.

,

.. ,-,

~

~

~ ~
'I

~
Q='ll

P..!!1~

~

~-;,!i!i"@ L ~

}!.. .-~~~:
f,

~-:",>~ I)

t'"' ~fti

l;::;.,:: . . . . .::

\(,~~-'-.',...,"l~{

i'i~

... i . , - . - , ..._,;;,'.

.. '

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-,1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 119

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

D-PO--U. -GI.-HN-EOR-T-. -S-R--3-/-U-S---19--A-T--P-PRR-OO-C-JET-CO-TR---D&-A-GTA-A-M-B-L-E--IN---A-L-BA-N-Y---------------------------A-L-BA--N-Y-C-OT-MI-PM-E-IN-T-HS-/-R---2----------------------P-EY-E-AN-RO-N-E-----$-E-S-T-S--0

422330 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 2

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

116

MANAGER:

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

116

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

DOUGHERT CR 459/COUNTY LINE RD@ PINEY WOOD CRK 431200 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .19 MANAGER: J. LINDSEY

ALBANY TIP I B-1
CONG DIST. B
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$

427

FED SHARE$

342

GA. SHARE$

85

0TH SHARE$

DOUGHERT RADIUM SPRINGS RD FM GARDEN HILL DR TO WHITEHEAD RD
450320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 1.10
MANAGER: D. CHURCH (C)

ALBANY T~P I H/R-10
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

1674 1339
502 837

DOUGHERT CR 539/DAWSON RD@ SR 520/US B2/LIBERTY XWAY ... & LEE CO 450400 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : 1.00 MANAGER: D. CHURCH

ALBANY TIP I H/R-13
CONG DIST. B
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW LOCL
CONST

UNDERWAY AFTER 96

DOUGHERT D'TOWN ENHANCEMENT OF ALBANY/TRAILS,LANDSCAPING,RAIL TERMINA 470910 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

ALBANY TIP I TSM-5
CONG DIST, 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

DOUGHERT BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT f4
470990 BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 $ ROW 1996 $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

so
. 200 1844
1475
50 419

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0 1242
994 248

GEORGIA DEPARTMENT OF TRANSPORTATION_

16-Sep-1993

STATE TRANSPORTATIQ'1 IMPROVEMENTS PROGRAM

Page 120

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P.I.NO.

PROJECT DATA

---------------------- ---------

--

DOUGLAS COUNTY OPERATED PUBLIC VANPOOL SERVICE

FISCAL

COST

- ------.-- COMM-E-N-TS----------------------------Y-E-AR---------E-S-T-S--

7Bl393 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 7

FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

OPERATING 1994 $

13

FED SHARE$

50

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

13

DOUGLAS 7Bl394

COUNTY OPERATED PUBLIC VANPOOL SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH

CONG DIST. 7

OPERATING 1995

$

18

FUND SOURCE: RURAL TRANSIT

FED SHARE$

66

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

18

DOUGLAS 7Bl395

COUNTY OPERATED PUBLIC VANPOOL SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPI:ENT: DOUGLAS MANAGER: STEVE KISH

CONG DIST. 7

OPERATING 1996 $

18

FUND SOURCE: RURAL TRANSIT

FED SHARE$

68

FEDERAL.TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

18

DOUGLAS 707031

PARK AND RIDE LOT I-20 & CHAPEL HILL RD.
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT- ADMIN FUNDS

CAPITALl994

$ 587

FED SHARE$ 470

GA. SHARE$

59

0TH SHARE$

59

DOUGLAS 7D7032

TRANSIT PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH

CONG. DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1995

$ 211

FED SHARE$ 169

GA. SHARE$

21

0TH SHARE$

21

DOUGLAS 7D7033

CAPITAL PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY
MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$ 211

FED SHARE$ 169

GA. SHARE$

21

0TH SHARE$

21

DOUGLAS 7Vl019

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENICES IN DOUGLAS COUNTY
MANAGER: STEVE KISH

CONG DIST . .-. 7

CAPITAL 1994

$

11

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

9

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1:

0TH SHARE$

1

.,

,-

.. ,.

,

-

lli,ii9

~

~ ,~

~~

I!!!!~~~

~~!~!~!

~~

~r::~:!'l

f::.....~

~a.t'iil ~
C

~r.r(~-.-...;--:'.

t .. : . ..:~

. .~ ~ ~

~--~/.i.,j t1,1

p-;-;,, 4.

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 121

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-,-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
DOUGLAS ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

7V1020 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 7

FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY

CAPITAL 1995

$

11

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

9

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

DOUGLAS 7Vl021

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL . FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY
MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1996

$

12

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

10

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

DOUGLAS 720970

SR 92 EXT/DOUGLASVILLE FM SR B NW TO SR 92 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 1.20 MANAGER: BILL MOSKAL

ATLANTA TIP f DO 2

PE 1996 $- 150

CONG DIST. 7

ROW

AFTER 96

r.

CONST

AFTER 96

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

DOUGLAS 721320

BANKHEAD HWY FM SWEETWATER RD E TO THORNTON RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 1.30 MANAGER: D. SMITH

ATLANTA TIP I DO 16
CONG DIST. 7
FUND SOURCE: SURFACE.TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AF.TER 96 AFTER 96

DOUGLAS 721420

SR 92 FM S/SR 166 NE TO LAKE MONROE RD/CR 140 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.26 MANAGER: N. PASSMORE (M)

ATLANTA TIP f DO 28 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 1095~
AFTER 96

DOUGLAS 721435

SR 5/BILL ARP RD@ DOG RIVER SW OF DOUGLASVILLE REPLACEMENT OF THE EXISTING BRIDGES{$). FROM 2 TO 3 LANES.
PROJECT MILEAGE : .20 MANAGER: D. GODWIN

DOUGLAS 721470

SR 5 N&SB FM $/SWEETWATER RD TO S/DOG RIVER BRIDGE ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1,75 MANAGER: D, GODWIN

ATLANTA TIP f DO 42 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DO 38 CONG DIST. 7.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

1

CONST 1995

$

913

FED SHARE $ 730

GA. SHARE $ 183

0TH SHARE $

PE 1992

UNDERWAY

ROW 1993 UNDERWAY

CONST 1996 $ 790

FED SHARE $

632

GA. SHARE $

158

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 122

COUNTY

P.
-

I.N-O--. -----

DESCRIPTION

PROJECT DATA

--

-----

FISCAL.

COST

-----------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

DOUGLAS SR 8/US 78/BANKHEAD HWY FM SR 92 EAST TO CR 15/SWEETWATER RD 721590. RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

ATLANTA TIP f DO 29 CONG DIST. 7

PE 1992 ROW

UNDERWAY AFTER 96

PROJECT MILEAGE : 5.90

CONST-

AFTER 96

MANAGER: D. SMITH (M)

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

DOUGLAS 721770

SR 166 FM OLD LOWER RIVER RD/DOUGLAS TO SR 70/FULTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2,91 MANAGER: RON BRAZIEL (M)

ATLANTA TIP f DO 19 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER96
AFTER 96

DOUGLAS 742800

LOWER RIVER RD FM SR 92 TO CAMP CREEK PKWY/FULTON RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 6,30 MANAGER: K FULBRIGHT {M)

ATLANTA TIP f DO 21 CONG DIST. 7 & 5
FUND SOURCE: SURFACE TRANSPORT. rEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$ 250 AFTER 96

DOUGLAS 751820

DOUGLAS BLVD EXT FM CR 814 TO CR 115 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 1,80 MANAGER: RON BRAZIEL (M)

ATLANTA TIP f DO 32 CONG DIST. 7
.FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL .90NST

$ 103 AFTER 96

DOUGLAS 751825

DOUGLAS BLVD EXT FM CR 142 TO CR 814 CONSTRUCTIONOF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.00 MANAGER: RON BRAZIEL (H)

ATLANTA TIP f DO 31 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADHIN FUNDS

PE 1996
ROW LOCL CONST

$ 103 AFTER 96

DOUGLAS 751970

CR 24/N BURNT HICKORY RD@ GOTHARD CREEK

1.

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE: .20

MANAGER: D. GODWIN

DOUGLAS 770162

CR 39/0LD ALABAMA RD@ SWEETWATER CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER: D. GODWIN

ATLANTA TIP f DO 41 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f DO 39 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$

386

FED SHARE$

309

GA. SHARE$

77

0TH SHARE$

PE 1992

UNDERWAY

ROW LOCL

CONST 1994

$

644

FED SHARE$ 515

GA. SHARE$

129

0TH SHARE$

,,

\.

<

.. ,,,

~

~

~

't-."/=i'~~
'

!if~

!l~~:ffi

1,~

[lr!i!iffi

~;frr]

,. li.'",:~~;e, ~:-.:!.l!l ~ 12

~~

Jb,.~:ir:~~

~

!---;,-~ !"



4,,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 12.3

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

EARLY US 27@ WAMBLE CREEK SOUTH OF BLAKELY

PE 1992 UNDERWAY

421640 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 2

ROW NONE

$

0

PROJECT MILEAGE : .50

GRIP PROJECT

CONST 1996

$

230

MANAGER: RON BRAZIEL (M)

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

184

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

46

422210 IS AN ASSOCIATED PROJECT.

0TH SHARE $

EARLY 422090

SR 62/BLAKELY FM WEST OF SR 200 TO EAST OF SR 62 BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.70 MANAGER: J. LINDSEY (M)

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

10

AFTER 96

EARLY 431320

SR 1 OVER BLUE CREEK TRIB REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER:

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1996 CONST

$

10

$

1

AFTER 96

C

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 124

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------CO-M--M-E-N-T-S-----------------.---------Y-E-A-R--------E-S-T-S--

ECHOLS SR 89/US 441 AT LONG CREEK

PE 1996

$

10

422425 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.

CONG DIST. 8

ROW NONE

$

0

PROJECT MILEAGE : .00

CONST

AFTER 96

MANAGER: N. PASSMORE (M)

FUND SOURCE: BRIDGE PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

422420 IS AN ASSOCIATED PROJECT.

ECHOLS 431060

SR 187@ SUWANNOCHEEE CRK /ALSO CLINCH COUNTY REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDEO LANES.
PROJECT MILEAGE : 1.00
MANAGER: J. LINDSEY

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1994

$ 1719

CONST 1995

$ 1366

FED SHARE $ 1093

GA. SHARE $ 273

0TH SHARE $

(.

. ,,

,.,

,:

~

~ -~

.~ , ~

~,~!ll

~

~.'!.Ii@

iel'!f!.~!!

~~l~

,, ,. ~ ,,.-,.~(::'!

~

~i'i."1

r.cr-:~:..i-.,

~

~. 111

,.._.... .,,,: ~a

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 125

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O- .---------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M--M-E-N-T-S---------------------------Y-EA-R---------E-S-T-S--

EFFINGHA I-95 FM N/I-16 IN CHATHAM TO S.C. STATE LINE ... SEE CHATHAM

PE 1994 . $

0

51116X UNKNOWN/ UNKNOWN

CONG DIST. 1

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994

$

0

MANAGER: UNKNOWN

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

511160 IS AN ASSOCIATED PROJECT.

0TH SHARE$

EFFINGHA I-16 WIDEN 10 BRIDGES@ MP 138.3; 145.9;- 146.6; 147.2/BRYAN 51119X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

0

ROW NONE $

0

CONST 1996 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

EFFINGHA NEW PARALLEL BR/SR 21@ LITTLE EBENEZER CRK 521705 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS

CONG DIST. 1 GRIP.PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521700 IS AN ASSOCIATED PROJECT.

PE 1990 UNDERWAY

ROW NONE

$

0

CONST 1994

$

170

FED SHARE $ 136

GA. SHARE $.

34

0TH SHARE $

EFFINGHA SR 17&26/US 80 FM SR 17 TO CHERRY ST IN BLOOMINGDALE/O~:ATHAM 522170 RECONSTRUCTION & WIDENIN.G FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .79 MANAGER: M. REYNOLDS (M)

SAVANNAH TIP f 87 H3 CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 896 AFTER 96

EFFINGHA CR 307@ EBENEZER CREEK NW OF CR 72
532390 BRIDGES/ REPLACEMENT PROJECT MILEAGE: .11 MANAGER: PETE BLOCKER

CONG DIST. 1 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW LOCL CONST

UNDERWAY AFTER 96

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 126

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

E-L-B-E-R-T-----CO--U-N-TY---O-P-E-R-A-TED P-U--B-L-IC---T-R-A-N-S-IT

SER--V-IC-E----------------------

------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

1Bl008 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 10

FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994

$

81

FED SHARE$

47

GA. SHARE$

0TH SHARE$

33

ELBERT 181009

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1995 $

82

FUND S.OURCE: RURAL TRANSIT

FED SHARE$

48

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

34

ELBERT 181010

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1996 $

87

FUND SOURCE: RURAL TRANSIT

FED SHARE$

51

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

36

ELBERT 1C2008

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT f:1ANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1994

.$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

ELBERT 1C2009

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED .. SHARE $

17

(.

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

ELBERT 1C2010

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

CONG DIST. 10

CAPITAL 1996

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

ELBERT 170990

CR 168/GOSS ROAD@ SOUTH BEAVERDAM CREEK NW OF ELBERTON REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER:

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $

8

ROW LOCL

CONST 1996. $ 282

FED SHARE$ 225

GA. SHARE$

56

0TH SH~$

~ .,,

.j,

,1

,f ~

~

~

~

~~ti

' ~ -.

~

~

~~j!

~~;~!ii

~~~ill!

~
.'" '\al,

,~:'!'..:.J;.'.i
,;)

}!::::.-,'.!;~

~

f:~~-;..~~i

~:::: .i~

.,. ~~!'

!" '.......~.
4,,

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 127

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

ELBERT CR 183/C'WATER-PLANTATION@ GUM LOG BRANCH N OF ELBERTON

PE 1994

$

5

170991 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES,

CONG DIST, 10

ROW LOCL

PROJECT MILEAGE : ,19

CONST 1996

$

173

MANAGER:

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

138

. FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

35

0TH SHARE$

,.-,

(

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 128

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D-A--TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--
EMANUEL COUNTY OPERATED PUBLIC TRANSIT SERVICE

2Bll08 TRANSIT FACILITIES/ OPERATIONS

CONG ors,;. 1

FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

(

FUND SOURCE: RURAL TRANSIT

OPERATING 1994 $

31

FED SHARE$

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

13

EMANUEL 2Bll09

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

CONG DIST. 1

OPERATING 1995 $

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

19

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE$

14

EMANUEL 2Blll0

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

CONG DIST. 1

OPERATING 1996 $

34

FUND SOURCE: RURAL TRANSIT

FED SHARE$

20

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

EMANUEL 2C2108

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

CONG DIST. l

FUND SOURCE: RURAL TRANSIT

CAPITAL 1994

$

32

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

EMANUEL 2C2109

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

CONG DIST. l

CAPITAL 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

EMANUEL 221300

SR 56@ N/S PRONG CANOOCHEE & OFLW;MCKINNEY BR;OGEECHEE OFLW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : ,80 MANAGER: D. GRIFFITH

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1994 $ 2285
FED SHARE $ 1828 GA. SHARE $ 457
0TH SHARE $

EMANUEL 222210

SR 26/SWAINSBORO@ SOUTHERN RR/REMOVE BR & CONST GRADE XING
BRIDGE REMOVAL/ NEW CONSTRUCTION PROJECT MILEAGE : .30 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: D. GRIFFITH

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1995 CONST .

UNDERWAY

$

23

AFTER 96

i,.

,, ,.-,

'. ,,.,.

~

.-,~ . ~

~ ~
~

~

~

~JfL~

f,tW;,m

h.,:,n ~~

(

I

f-"';#.":l\ll

w~c':;':

f;~,......'{

~

~...

'(~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATI9N IMPROVEMENTS PROGRAM

Page 129

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O-.----------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

EMANUEL SR 46@ JACKS CREEK l MILE WEST OF CANDLER CO LINE

PE 1993 UNDERWAY

231130 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 1

ROW 1994

$

1

PROJECT MILEAGE : .30

CONST 1995

$

878

MANAGER: D. GRIFFITH

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

702

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

176

0TH SHARE$

EMANUEL 231380

SR 57/KITE RD@ MCLEOD BRIDGE RD/GOLF RD/ROBIN RD
INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .36 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: D. GRIFFITH

CONG DIST. 1
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1994

$

9

CONST 1994

$

267

FED SHARE$ 240

GA. SHARE$

27

0TH SHARE$

EMANUEL 250460

OLD NUNEZ RD/CR 461 FM MEADOWLAKE PKWY/CR 365 TO SR 56/57 MINOR WIDEN & RESURF / RECST. OR REHAB. PROJECT MILEAGE : .95 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: D. GRIFFITH

CONG DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994

$

658

FED SHARE$

526

GA. SHARE$

132

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 130

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

----------------------------------------

----------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

EVANS SR 73/US 301 FM TATTNALL CO LINE TO S CL/CLAXTON

PE 1993

UNDERWAY

522005 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

CONG DIST. 1

ROW 1995

$

200

PROJECT MILEAGE : 6.75

,

CONST

AFTER 96

MANAGER: PETE BLOCKER

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY AOMIN FUNDS

4

I 4

. '.

.,

Jm!ll!l!!I!

. ,, ~

~~

~ .

~

~

!i!~U~

~,i}'t!~

MJ

1~>. :~:~ ~ *

'tji;~:,;,':1

~~::~:-;-::~-;

i::~;~~1

:-: -. ::.:

~

..

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 131

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------------------------------------------------------- ---------------------------------------------------------------

FANNIN COUNTY OPERATED PUBLIC TRANSIT SERVICE

6B1348 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: FANNIN

OPERATING 1994

$

76

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

44

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

32

FANNIN 6Bl349

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

79

FUND SOURCE: RURAL TRANSIT

FED SHARE$

46

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

33

FANNIN 6Bl350

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1996 $

82

FUND SOURCE: RURAL TRANSIT

FED SHARE$

48

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

34

FANNIN 6C2348

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1994

$

31

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

FANNIN 621340

SR 5 FM SR 2/BLUE RIDGE N TO PROP MCCAYSVILLE BYP- NR CR 138 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 7.80 MANAGER: J. GRAYBEAL (M)

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FANNIN 630875

SR 60@ HEMPTOWN CRK/MINERAL BLUFF; @ YOUNG STONE CRK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .36 MANAGER: BILL MCVEY

FANNIN 63Y875

(_
PROJECT SHOWN FOR "STP" FUNDS ONLY ... SEE 630875 UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 63Y875 IS AN ASSOCIATED PROJECT.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630875 IS AN ASSOCIATED PROJECT.

PE 1988 UNDERWAY

ROW 1989 UNDERWAY

CONST 1994

$

611

FED SHARE $

489

GA. SHARE $

122

0TH SHARE $

PE 1988 UNDERWAY

ROW NONE

$

0

CONST 1994

$

209

FED SHARE $

167

GA. SHARE $

42

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 132

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P, I.NO.

PROJECT DATA

--------- - --- FANNIN SR 515 FM CR 300 (PICKENS) TO UNION CL .... PICKENS/GILMER

------C-O-M--M-E-N-T-S ---------------------------Y-EA--R --------E-S-T-S --

PE NONE $

0

67080Z

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE ETC.CONG DIST. 9

PROJECT MILEAGE : 48.26 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: L. SEABROOK

FUND SOURCE: SURFACE TRANSPORT.

ROW 1994

$

CONST 1994 $

FED SHARE$

0 0

FEDERAL HIGHWAY. ADMIN FUNDS

GA. SHARE$

670800 IS AN ASSOCIATED PROJECT.

0TH SHARE$

FANNIN 670930

RESTORE MINERAL BLUFF DEPOT MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW NONE $

0

CONST 1996 $ 128

FED SHARE$

102

GA. SHARE$

0TH SHARE$

26

l

C,0

'.

~

~

. ~
~


. ~
~

~Xil~

~ft~,~~

f);.(:.~11

t::v,;._i::~

\!(.:~--~::~

~

r.:e.~:~ :~

~

~,:~1::f

I\.'.

I~

~~ .

!t.&-..:--:,:-~'.~
f ..

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 133

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-------------------------------------------------------------! -------------------------------------------------------------------

FAYETTE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

.

3Vl022 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 3

FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY

CAPITAL 1994

$

10

MANAGER: STEVE KISH

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

FAYETTE 3V1023

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH.

CONG DIST. 3

CAPITAL 1995

$

10

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

FAYETTE 3Vl024

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FAYETTE COUNTY MANAGER: STEVE KISH

CONG DIST. 3

CAPITAL 1996

$

10

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

FAYETTE 321950

SR 92 S/FAYETTEVILLE FM MCBRIDE RD/INMAN TO J MAYFIELD DR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3,38 MANAGER: M. REYNOLDS (M)

ATLANTA TIP t FY 3
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 2313 AFTER 96

FAYETTE 321960

SR 85 $/FAYETTEVILLE FM $/BERNHARD RD TO OLD SR 92/F'VILLE RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.58 MANAGER: M. REYNOLDS (M)

ATLANTA TIP t FY 6
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FAYETTE 321964

SR 85 FM SR 74 N TO BERNHARD RD/CR 126 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.30 MANAGER: M. REYNOLDS(CM)

ATLANTA TIP t FY 5
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FAYETTE 321966

SR 85@ WHITEWATER CREEK REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: M. REYNOLDS (M)

ATLANTA TIP t FY 13
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1996

$

136

FED SHARE $

109

GA. SHARE $

27

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM

16-Sep-1993 Page 134

PROJECT LISTING BY COUNTY .FY 1994/FY 1996

COUNTY

DESCRIP_TION

FISCAL

COST

P.I.NO.

PROJECT DATA

F-A-Y--E-T-TE----SR---5-4-@---S-C-L--RR

------

------

-----------A--T-L-A-N-TC-AO-M.-T-MI-PE-N-fT-S-FY---1-2---------------------P-EY-E-A1-R9-9-2-----U-EN-DS-TER-SW--AY

322065 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

CONG DIST. 3

ROW NONE

$

0

PROJECT MILEAGE : .01

CONST 1996

$

663

MANAGER: M. REYNOLDS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 530

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 133

0TH SHARE $

FAYETTE 32206X

SR 34/54 FM FISCHER CROSS RDS TO SR 74 ... SEE COWETA CO UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: M. REYNOLDS

r_-

FAYETTE 32206Y

SR 54@ LINE CREEK/SEE COWETA CO UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M. REYNOLDS

coNG oisT. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 322060 IS AN ASSOCIATED PROJECT.
CONG DIST. 3
FUND "SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322063 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1995 CONST

UNDERWAY

$

0

AFTER 96

PE NONE $

0

ROW NONE $

0

CONST 1996 $-

0

FED SHARE$

GA. SHARE$

0TH SHARE$

FAYETTE 322350

SR 74 FM CROSSTOWN RD/TDK BLVD NW TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: 2:15 MANAGER: M. REYNOLDS

ATLANTA TIP f FY 9 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT . . FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FAYETTE 322355

SR 74 FM SR 85 NW TO CROSSTOWN RD/TDK BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.91
MANAGER: M. REYNOLDS (M)

ATLANTA TIP f FY 9 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AFTER 96 AFTER 96

FAYETTE 322357

SR 74@ FLAT CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .25 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f FY 15 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW NONE CONST

$

10

$

,o

AFTER 96

FAYETTE 322358

SR 74 BICYCLE BRIDGE OVER SR 74 IN PEACHTREE CITY
BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: N. PASSMORE (C)

ATLANTA TIP t FY 14
CONG DIST. 3
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1994

$

754

FED SHARE$

603

GA. SHARE$

48

0TH SHARE$ 103



.

~

E:LL....,

~

~



,f

12L-.J
e_l

f,.JLi

P.tU.'.~

~1~

~--L,

t~}.,'!'l,J

r.. .,_.,.,i

1'r.~~'.~1~

~

::-:-:.....;,

i.'.::-:~-~~

r.~

~


!'.""'""''""~:


GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 135

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. -I.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FAYETTE SR 74 AT PASCHALL ROAD IN PEACHTREE CITY

ATLANTA TIP f FY 9

PE 1994

UNDERWAY

322650 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 3

ROW 1994 $

10

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2

CONST 1994 $ 231

MANAGER:

FUND SOURCE: HWY. SAFETY

FED SHARE$ 208

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

23

0TH SHARE$

FAYETTE 322660

SR 85 AT HOOD AVENUE NORTH OF FAYETTEVILLE SIGNALS/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER:

ATLANTA TIP f FY 18 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $ 347

FED SHARE$

312

GA. SHARE$

35

0TH SHARE$

FAYETTE SR 74 AT CRABAPPLE/PEACHTREE, TYRONE AND JENKINS ROADS 322670 . ACCELERATION/DECELERATION LN / TRAFFIC
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER:

ATLANTA TIP f FY 19 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1995 $ 173

FED SHARE$ 156

GA. SHARE$

17

0TH SHARE$

FAYETTE 331930

SR 85 CONN FM CR 168 TO SR 85; PPL FM 4.0 TO 6.0 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.I,
PROJECT MILEAGE : 3.90 MANAGER: K FULBRIGHT (M)

ATLANTA TIP f FY 1 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1995 CONST

UNDERWAY $ 2950 AFTER 96

FAYETTE 342800

SR 85 CONN FM SR 16 IN SPALDING CTY N TO CR 168 IN BROOKS RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 3.34
MANAGER: GORDON BROWN(M)

ATLANTA TIP f FY 17
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 . ROW
CONST

$

70

AFTER 96

AFTER 96

FAYETTE 37091X

CR 157@ LINE CRK & OFLW .. SEE COWETA CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: UNKNOWN

FAYETTE 370920

CR 275/SHERWOOD RD@ WHITEWATER CREEK REPLACEMENT OF THE EXISTING BRIDGES(S), NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER: GORDON BROWN

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
370910 rs AN ASSOCIATED PROJECT.
ATLANTA TIP f FY 11 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1994 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1994 $ 341

FED SHARE$ 273

GA. SHARE$

68

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993. Page 136

COUNTY

DESCRIPTION

FISCAL

COST

P .I.NO.

PROJECT DATA

--------------------------------------

----

-------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FAYETTE SR 54@ MORNING & CAMP CRKS; FLINT RIVER/SEE CLAYTON CO

ATLANTA TIP f CL23/FY2

PE 1986 UNDERWAY

72104X REPLACEMENT OF THE EXISTING BRIDGES{S), NO ADDED LANES,

CONG DIST. 3

.

ROW 1994

$

0

PROJECT MILEAGE : ,00

CONST 1995

$

0

MANAGER: M; REYNOLDS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

FEDERAL HIGHWAY ADMIN FUNDS 721040 IS AN ASSOCIATED PROJECT,

GA; SHARE $ 0TH SHARE $

FAYETTE 72129X

SR 85 FM SR 279/FAYETTE TO ROBERTS DR/CLAYTON
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: K FULBRIGHT

ATLANTA TIP f CL15/FY4
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 721290 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1996 CONST

UNDERWAY

$

0

AFTER 96

FAYETTE 72129Y

SR 85 NBL@ CAMP CREEK/SEE CLAYTON COUNTY UNKNOWN/ UNKNOWN PROJECT MILEAGE : .OO, - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: K FULBRIGHT

ATLANTA TIP f CL 77 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
721295 IS AN ASSOCIATED PROJECT.

PE 1992 ROW NONE CONST

,UNDERWAY

$ .

0

AFTER 96

FAYETTE 721440

SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 & CLAYTON CO RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 5.53 MANAGER: M. REYNOLDS (M)

ATLANTA TIP f CL41/FY10 CONG DIST. 3 .
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 72144X IS AN ASSOCIATED PROJECT.

PE 1996 ROW CONST

.$

144

AFTER 96

AFTER 96

FAYETTE 75185X

SR 314 FM SR 279 TO NORMAN DR/CLAYTON . SEE CLAYTON CO
UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: M GANNAWAY

ATLANTA TIP f CL5/FY8 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 751850 IS AN ASSOCIATED PROJECT.

PE 1996 ROW CONST

$

0

AFTER 96

AFTER 96



.



~

~

28 ~
~

l!-.'LL.1!

~!,

~UJ:-:~!C

t\.,l,,_.:'!l

!~l,r'J

,, ~

P,fj!itJ~

tt:.:~;re

t'fr~!.{tru

t>,.;;,

~

.. i.'. .:(;; I-'..,,:,'{, ..,,

, ..I~

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 137

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--. I-.-N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FLOYD TRUCK, RADIOS, SECURITY CAMERAS, CAP. MAINT., SHELTERS, ETC

6D6010 TRANSIT PROJECTS / CAPITAL

1.

CONG DIST. 7

FUNDS RECIPIENT: ROME TRANSIT SYSTEM

CAPITAL 1994

$ 1072

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

B5B

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

107

0TH SHARE$

107

FLOYD 6D601l

5 TRANSIT BUSES, VAN, CAR, CAP. MAINT., SHELTERS, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1995

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

1116 B93 112 112

FLOYD 606012

5 TRANSIT COACHES, TOW TRUCK, CAP. MAINT., SHELTERS, ETC. TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1996

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

1149 919 115 115

FLOYD 6D6013

PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1994

$ ' 1330

FED SHARE $- 665

GA. SHARE $.

0TH SHARE $: 665

FLOYD 6D6014

PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

1184 213
213 11B4

FLOYD 6D6015

PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: URBAN TRANSiT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

1254 213 213
1254

FLOYD 6Vl010

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1994

$

23

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

2

GEORGIA DEPARTMENT OF TRANSPORTATION STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

16-Sep-1993 Page 138

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

F-L-O-Y-D-----E-L-D-E-R-L-Y--A-N-D--D--IS-A-B-L-E-D--V--E-H-IC--L-E-S--AND

E-Q-U--IP-M-E-N-T------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

6Vl011 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 7

FUNDS RECIPIENT: AGENCIES IN FLOYD MPO AREA MANAGER: STEVE KISH

CAPITAL 1995

$

24

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

19

FEDERAL TRANSIT.ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

2

FLOYD 6V1012

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES.IN FLOYD MPO AREA MANAGER: STEVE KISH

CONG DIST. 7

l

CAPITAL 1996

$

25

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

20

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

FLOYD 610980

DECK OVERLAYS FOR 115-0006, 115-0007, 123-0024, 129-0066

BRIDGES/ RECST. OR REHAB.

.

PROJECT MILEAGE : .00

MANAGER: L. SEABROOK

FLOYD 620590

SR 1/US 27 IN ROME FM 5TH AVE TO JOHN DAVENPORT DR RECONSTRUCTION & WIDENING FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .20 MANAGER: H. ASHMORE

CONG DIST. 9 & 7
FUND SOURCE: I-STATE M!\,INT. FEDERAL HIGHWAY ADMIN FUNDS 61Y980 IS AN ASSOCIATED PROJECT.

ROME TIP I L-85-11

'

CONG DIST. 7

GRIP PROJECT

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 3135 2822 314

PE 1994 $ ROW 1995 $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

36 50 1215 972 243

FLOYD 620900

SR 101/S OF ROME OVER SR 20 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .30 MANAGER: RON BRAZIEL (M)

ROME TIP f S-86-24 CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1985 ROW LOCL CONST

UNDERWAY AFTER 96

FLOYD 621075

US 27@ ARMUCHEE & LITTLE ARMUCHEE CRKS/CHATTOOGA CO REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .06 MANAGER: RAY METTS

FLOYD 621450

W ROME BP FM CR 638 TO CR 268/INCL BR@ COOSA RVR CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : 1.10 MANAGER: M GANNAWAY

ROME TIP I L-89-8
CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621070 IS AN ASSOCIATED PROJECT.
ROME TIP .I L-89-10 CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1994 $ 725

FED SHARE $ 580

GA. SHARE $

145

0TH SHARE $

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1994

$ 3952

FED SHARE $ 3162

GA. SHARE $

790

0TH SHARE $

,, "'

.

'

IH?-!dm

~

~ ~Lill! '

~

f!i'j!2!=~

~
1;;1~=

1'11'.~1~

~

~-~I\OC;<&

/i?'/,\';1~

~:i'&

r,t:~~-~~~

t~d.--:>:-~

,. ., . ,. . . ~~

~


j,:.-'>-,;--;


GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION-IMPROVEMENTS PROGRAM

Page 139

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I--.N-O--. ---------------P-R-O--JE-C-T--D--A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FLOYD SR 20/100 FM SR 100 NORTH TO SR 100 SOUTH@ COOSA/INCL CLVT

PE 1992 UNDERWAY

621550 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

CONG DIST. 7

ROW

AFTER 96

PROJECT MILEAGE : 2.95

CONST

AFTER 96

MANAGER: BILL MCVEY (M)

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY AOMIN FUNDS

FLOYD 621560

SR 53 FM MP 0.54 TO 14.15 [ WON 20 CLVTS) BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 14.89 MANAGER: BILL MCVEY (M)

FLOYD 621690

SR 101 FM CR 740/CS 899 NORTH TOE 12TH ST/ROME RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.84 MANAGER: RON BRAZIEL (M)

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

44

AFTER 96

ROME TIP I S-92-25
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1994 ROW 1996 CONST

$

134

$ 1150

AFTER 96

FLOYD 621700

SR 20/NEW ROUTE/ATLANTA TO MEMPHIS HIGHWAY ... & BARTOW CO PRELIMINARY ENGINEERING/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: N PASSMORE (M)

ROME TIP f 621700 CONG DIST. 7
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE 1993 ROW NONE CONST NONE

UNDERWAY

$

0

$

0

FLOYD 631350

SR 53 AT SR 140

c

INTERSECTION IMPROVEMENT/ TRAFFIC

.

PROJECT MILEAGE : .02 - EXIST. LANES: 4 /PROPOSED LANES: 4

MANAGER: BILL MCVEY

FLOYD 650410

DIVISION ST/ROME FM SHORTER AVE TO REDMOND RO/& REMOVE RR BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.04 MANAGER: RON BRAZIEL

FLOYD 650460

SR 101 OVER ETOWAH RIVER IN ROME REHAB. OF THE EXISTING BRIOGE(S). FRO~ 4 LANES TO 5 LANES.
PROJECT MILEAGE : .37 MANAGER: D. SMITH

ROME TIP I S-93-1
CONG DIST. 7 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
ROME TIP f L-85-12 CONG DIST. 7 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
ROME TIP f L-89-4 CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0
o
165 149
17

PE 1993 UNDERWAY

ROW LOCL

CONST 1994 $ 1619

FED SHARE$ 1295

GA. SHARE$

324

0TH SHARE$

PE 1993 UNDERWAY

ROW 1996 $ 405

CONST

l AFTER 96

GEORGIA DEPARTMEL:T OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 140

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--,I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FLOYD CR 641 OVER POCKET/JOHN'S CK/S POCKET CAMPGROUND

PE 1993 UNDERWAY

670760 BRIDGES/ REPLACEMENT

CONG DIST. 7

ROW NONE $

0

PROJECT MILEAGE : .00

CONST 1994

$

220

MANAGER: BILL MCVEY

FUND SOURCE: FED. LANDS

FED SHARE$ 220

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

FLOYD 670770

CR 641 OVER JOHNS/POCKET CREEK
BRIDGES/ REPLACEMENT PROJECT MILEAGE : ,15 MANAGER: BILL MCVEY

FLOYD 670820

MAYO'S BAR LOCK AND DAM RESTORATION ON COOSA RIVER MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: MEG BRYSON

CONG DIST. 7
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
ROME TIP I 670820
CONG DIST. 7
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY ROW LOCL
CONST 1994 $ 277 FED SHARE$ 277 GA. SHARE$
0TH SHARE$

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

1450
1160 710
1000

FLOYD 670830

CLASS I BIKEWAY IN ROME BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00. - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: MEG BRYSON

ROME TIP I 670830
CONG DIST. 7
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996 $ 465

FED SHARE$ 372

GA. SHARE$

0TH SHARE$

93

FLOYD 670880

BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT 16
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
.FED SHARE$
GA. SHARE$ 0TH SHARE$

0 0 1019 815 204

,, ,,,



.

~

~ ~ fll,.,_!'!!.!Ll

...



P..L,Ji!,!

~l.)fJl

~

L,.'.':;.,

~),"""-~'1

/,.(.._ ..,,
I

fE!. .;,;~

1,,-.:~,~

11.,l":.:1;_,

/~tt':~{t:f'/

j , ........... :--:

. '

f I

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 14_1

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO,

PROJECT DATA

COMMENTS

YEAR

ESTS

-------------------------- --------------------------------------------------------------------------------------------------------

FORSYTH COUNTY OPERATED PUBLIC TRANSIT SERVICE

1Bl013 TRANSIT FACILITIES/ OPERATIONS

CONG DIST, 9

FUNDS RECIPIENT: FORSYTH

OPERATING 1994

$

51

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

30

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

21

FORSYTH 1B1014

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

53

r.

FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

FED SHARE$

31

GA. SHARE$

0TH SHARE$

22

FORSYTH 1B1015

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1996 $

56

FUND SOURCE: RURAL TRANSIT

FED SHARE$

33

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

23

FORSYTH 1C2013

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL 1994

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

FORSYTH 1C2014

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH

CONG DIST. 9

CAPITAL-1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE$

17

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

FORSYTH 121690

SR 9 SOUTH OF CUMMING FM SR 141 N TO SR 20 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.80 MANAGER: H. ASHMORE(M)

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW
CONST

UNDERWAY AFTER 96
AFTER 96

FORSYTH 121910

RW ON 162010,162014,162018 . FM SR 371 TO ALCOVY RD RIGHTS-OF-WAY/ NEW CONSTRUCTION PROJECT MILEAGE : 25.60 - EXIST. LANES: 0 /PROPOSED LANES: 4 MANAGER: NEIL DAVIS

ATLANTA TIP f R 54 CONG DIST. 9 GRIP PROJECT FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PE NONE ROW 1989 CONST NONE

$

0

UNDERWAY

$

0

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 142

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

P. I.NO.

PROJECT DATA

---- ---------- -

---

--

FORSYTH SR 141 FM 0,6 MI NORTH OF FULTON CO LINE TO SR 9

121980 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 6.21

MANAGER: H. ASHMORE(M)

FISCAL

COST

-------------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

PE 1992 UNDERWAY

CONG DIST. 9

ROW

AFTER 96

CONST

.AFTER 96

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

FORSYTH 122015

SR 306/369 FM SR 400 TO HALL CO LINE/INCL BR@ FOUR MILE CRK RECONSTRUCTION &- WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 9.09 MANAGER: H. ASHMORE(M)

FORSYTH sR 369@ SIX MILE & @ TWO MILE CREEKS 122017 REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .SO MANAGER: H. ASHMORE(M)

FORSYTH SR 20 FM SR 400 TO SAMPLE ROAD/CR 80 122250 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.02
MANAGER: H. ASHMORE(M)
(_

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 122012 IS AN ASSOCIATED PROJECT,

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 122015 IS AN ASSOCIATED PROJECT,

PE 1993 ROW NONE CONST

UNDERWAY

$

0

AFTER 96

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW CONST

UNDERWAY AFTER 96 AFTER 96

FORSYTH 122540

SR 400 INSTALL LOGO SIGN PANELS IN FORSYTH COUNTY
SIGNING/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

FORSYTH 122550

SR 9 AT SR 20 SOUTH OF CUMMING INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

FORSYTH 132390

SR 306 AT SR 369 INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .53 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS_

CONG DIST. 9 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST,. 9 FUND SOURCE: HWY, SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1994 $

21

FED SHARE$

17

GA. SHARE$

4

0TH SHARE$

PE NONE $ ROW 1995 $ CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SHARE$

o
1 173 156
17

PE 1994 UNDERWAY

ROW 1994

$

4

CONST 1995 $ 310

FED SHARE$ 279

GA. SHARE$

31

0TH SHARE$

,, ,.

..,



~

. ~ ~ ,, ~~

[G~C~

,=;,= -za.=,

[,:,X:\\i

~/!'{J

121,:.}~1

~
'

f!!'i'~J

~'TifJi

it*-!i!!!i

,::!:;:~:

I'::.:. .......-.,

~-:--"-




GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 143

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O--JE-C-T---D-A-TA-----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

FORSYTH SR 20/SR 9/CUMMING@ CS 526; & CR 87

PE NONE $

0

141605 INTERSECTION IMPROVEMENT/ TRAFFIC

CONG DIST. 9

ROW 1994 $

50

PROJECT MILEAGE : .10 - EXIST. LANES: 2 /PROPOSED LANES: 3

CONST 1994 $ 250

MANAGER: L. OWENS

FUND SOURCE: HWY. SAFETY

FED SHARE$ 225

FEDERAL HIGHWAY AOMIN FUNDS

GA. SHARE$

25

0TH SHARE$

FORSYTH 141770

SR 9@ SR 306/CHARLES PLACE IN CUMMING INTERSECTION IMPROVEMENT/ TRAFFIC PROJECT MILEAGE : .15 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: L. OWENS

CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 150 135 15

FORSYTH 171010

BRIDGE PAINTING PROJECT FOR FY 1994 IN DISTRICT fl
BRIDGE PAINTING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: UNKNOWN

(.

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE NONE $ ROW NONE $
CONST 1994 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0 1245
996 249

GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 144

PROJECT LISTING BY COUNTY FY 1994/FY 1996

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-----------------------------------------------------------------------------------------------------------------------------------

FRANKLIN I-85 SIGN MOD FM DEK CL TO SC STATE LN .. GWIN/JACKS/BARR/BANK

PE NONE $

0

11044W SIGNING/ MAINTENANCE

CONG DIST. 10 & 6

ROW NONE $

0

PROJECT MILEAGE : 76.00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1994 $

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

110440 IS AN ASSOCIATED PROJECT.

0TH SHARE$

FRANKLIN I-85 UPGRADE NB REST AREA f 81
110460 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER:

CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$

39 0
1310 1179
131

FRANKLIN SR 17(@I-85 RECST INTERCHANGE-IM]FM NCL LAVONIA-STEPHENS CL 12Y080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .00
MANAGER: UNKNOWN

CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 122080 IS AN ASSOCIATED PROJECT.

PE 1994

$

0

ROW 1995 $

0

CONST 1996 $ 500

FED SHARE$ 450

GA. SHARE$

50

0TH SHARE$

FRANKLIN SR 106 AT SR 51 141760 INTERSECTION IMPROVEMENT/ TRAFFIC
PROJECT MILEAGE : .30 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS

CONG DIST. 10
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1993 UNDERWAY

CONST 1994 $ 333

FED SHARE$ 300

GA. SHARE$

33

0TH SHARE$

FRANKLIN OVERLAYS FOR 013-0013,089,0089,119-0002,119-0040,139-0004
811045 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: UNKNOWN

CONG DIST. 10 & 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 81Y045 IS AN ASSOCIATED PROJECT.

PE NONE $ ROW NONE $ CONST 1994 $
FED SHARE$
GA. SHARE$
0TH SHARE$

0 0 1108 997 111

FRANKLIN OVERLAYS FOR SIX BRIDGES IN DIST 1,7; TO SHOW STP FUNDS 81Y045 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: UNKNOWN
I_

PE NONE $

0

CONG DIST. 10 & 4

ROW NONE $

0

CONST 1994 $ 300

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$ 240

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

60

811045 IS AN ASSOCIATED PROJECT.

0TH SHARE$

. ,, '

..

~

~ !i~:~ ~-~~~i e_~;Jffi ~ ~ ~ ; ~~r,;::~ r,.:n;,i.,~ 1:01';:,~ w-x,r,r.~ ~ f;< ..,.:, I





GEORGIA DEPARTMENT OF TRANSPORTATION

16-Sep-1993

STATE TRANSPORTATION IMPROVEMENTS PROGRAM PROJECT LISTING BY COUNTY FY 1994/FY 1996

Page 145

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

FULTON TRANSIT TRAVELER DEMONSTRATION PROJECT

FISCAL

COST

------------------------.-C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S--

7D7010 TRANSIT PROJECTS/ CAPITAL

CONG DIST. 5 & 4

FUNDS RECIPIENT: CITY OF ATLANTA

CAPITAL 1994

$ 1875

MANAGER: STEVE KISH

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$ 1500

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

375

FULTON 707011

NORTH RAIL LINE EXTENSION - MEDICAL CTR TO NORTH SPRINGS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4

CAPITAL 1994

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE.$

50332 40266
10066

FULTON 7D7012

FIXED GUIDEWAY MODERNIZATION PROGRAM TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4

CAPITAL 1994

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

8494 6795
1699

FULTON 707013

PROCURE 100 BUSES AND BUS RELATED FACILITIES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5 & 4

CAPITAL 1994

$

FUND SOURCE: URBAN TRANSIT DISC.