Fourteenth report of the State Highway Board of Georgia to the Governor and General Assembly of the State of Georgia for the fiscal year ending June 30, 1932 [June 30, 1932]

FOURTEENTH REPORT
of the
STATE HIGHWAY BOARD OF GEORGIA
to the
GOVERNOR AND GENERAL ASSEMBLY
of the
STATE OF GEORGIA

.I
1300-11338

for the
FISCAL YEAR ENDING JUNE 3o, 1932
.,.IE!N PIUNT!NQ CO,, ATLANTAo OlAo

FOURTEENTH REPORT
of the
STATE HIGHWAY BOARD OF GEORGIA
to the
GOVERNOR AND GENERAL ASSEJ\1BLY
of the
STATE OF GEORGIA
for the
FISCAL YEAR ENDING JUNE 30, 1932

Oglethorpe Oak, Darien, Coastal Highway

CONTENTS
Part One.-Introductory Part Two.-Accounting Part Three.-Construction Part Four.-Maintenance Part Five.-Other Activities, Statistics and
Miscellaneous Information

Nancy Hart Marker, Elbert County, Georgia.

PART ONE INTRODUCTORY

STATE HIGHWAY BOARD OF GEORGIA HISTORY OF STATE HIGHWAY BOARD MEMBERSHIP
1916 THROUGH JUNE 30, 1932 The State Highway Department of Georgia was created by Act of Legislature, August 16, 1916, and a Highway Commission was appointed composed of the three members of the Prison Commission, together with the State Geologist, the Dean of the College of Civil Engineering of the State University, and the Professor of Highway Engineering at the Georgia School of Technology. The original Highway Commission consisted of the following members: T. E. PATTERSON, Chairman, "l\Iember of Prison Commission E. L. RAINEY, Member of Prison Commission
J E. DAVIDSON, Member of Prison Commission
S. W. McCALLIE, State Geologist C. M. S'l'RAHAN, Professor of Ci,il Engineering, State University R. D. KNEALE, Professor of Civil Engineering, Georgia School of Technology 'fhe above Commission served until the reorganization of the Highway Department, by Act of Legislature approved August 18, 1919. 'l'his Legislature of 1919 provided that the State Highway Department of Georgia reorganized and reconstructed should be managed and controlled by the State Highway Board, which should consist of three members appointed by the Governor, one from each of three divisions of the State and the boundaries of each division were named. The term of office of initial appointees to be two, four, and six year~, after which each new member to serve six years. The Appointments to the newly reorganized State Highway Board and their successors with term of office follows:
6

Name of Member

Title

Appointed By Term Began Term Ended

Remarks

C. M. Strahan ______ _ Chairman __ Governor Dorsey ___ Sept. l, 1919__ Dec. 31, 1921 _Expiration of initial two year term. Stanley B. Bennet ______ _ Member_____ Governor Dorsey __ Sept. l, 1919_. Dec. 31, 1923__ Expiration of initialfour year term. R. C. Neely ___________ _ Member ______ Governor Dorsey__ Sept. l, 1919__ Oct. 27, 1923 _ Died in Office. John N. Holder_ _______ . Chairman ___ Governor Hardwick Jan.l, 1922___ June 2, 1929__ Succeeded C. M. Strahan andRe-
signed. W. T. Anderson__________ Member _____ Governor Walker_ __ Nov. l, 1923___ July, 1925 ____ Succeeded R. C. Neely andRe-
signed. Stanley S. Bennet ____ _ __ Member_ ____ Governor Walker_ __ Jan.l, 1924 Dec. 31, 1929__ Reappointed, served until term
expired. John R. Phillips _________ Member_ ____ Governor Walker .. __ Aug., 1925____ Dec. 31, l93L_ Succeeded W. T. Anderson, served
until term expired. ""'Sam Tate_________________ Chairman____ Governor Hardman June 4, 1929__ Aprill, 1930__ Succeeded John N. Holder, and
Resigned. W. C. Vereen ______________ Member_ _____ Governor Hardman Jan. l, 1930_. StillinOffice_ Succeeded Stanley S. Bennet.
J. W. Barnett_____ _ __ __ Chairman __ . Governor Hardman April l, 1930__ Still in Office. Succeeded Sam Tate. J. P. Wilhoit ____________ Member_ _____ Governor RusselL __ Jan. l, 1932____ Still in Office_ Succeeded John R. Phillips.

Beauty and Convenience along the Coastal Highway in Mcintosh County. Many tourists stop for water from the fiowing well. The planting around the little pool is of oleanders, canna and tiger Wlies. The family in the picture are from Vermont.

FOREWORD The past year has shown one change in Board membership. Hon. J. P. "Wilhoit, of Warrenton, was appointed by Governor Russell to succeed Hon. John R. Phillips whose term expired December 31, 1931. There has been an addition to the State System during the year of 1,058.306 miles, making a total of 8,196.816 miles at the end of the year. Comments in preceding reports have explained in detail the operation of each unit of the Highway Department and the same detail would be merely a repetition: therefore, comments in this report will be confined, more or less, to activities aside from operation procedure.
9

ORGANIZATION CHART- STATE HIGHWAY DEPARTMENT OF GEORGIA 1931-1932

I
SeC'Y TO I:JOARD
......
0

Sr.:.re HIGHWAY ENatNEER

~~rsr-~,n.,~)~:~:~=~'" :~= :::

r I l TREASURER
I ~';/J:;~<;;:K I 15;Ar2:::~~~N I

PRtNCIPAI.. As:'>T ENGJNto~R

J 4 75 IIII

;:o"'::~~."'~-;-NNG
c- ~~' ' -

R~I

_ j DRAFTS~

~AccouNTANTS I
AND CLERkS

Cosr AccouNT 7

1
ReseARCH ENGR

.5 TENOGRAPHC/;>S

QFFICC ENGINeER

OFFICIALS AND PERSONNEL OF THE BOARD AS OF JUNE 30, 1932.

Name

Title

Location

J. W. Barnett__ _ Chairman, State Highway Board __ Atlanta

W. C. Vereen _________ Member, State Highway Board ____ Moultrie

J.P. Wilhoit _________ Member, State Highway Board_____ Warrenton

F. P. Vanstory _______ Treasurer, State Highway Board___ Atlanta

Sam M. Mathews ______ Secretary, State Highway Board___ Atlanta

Ralph Moore _________ Purchasing Agent _________________ Atlanta

B. P. McWhorter______ State Highway Engineer_ _________ Atlanta

E. N. Parker_ _________ Asst. State Highway Engineer_ ____ Atlanta

C. W. Wright _________ Principal Assistant Engineer_ _____ Atlanta

Searcy B. Slack_______ Bridge Engineer_ __________________ Atlanta

L. B. Ackerman_______ Engineer in Charge of State Forces Atlanta

Geo. C. Blount_ ______ Maintenance Engineer_ ___________ Atlanta

E. N. Seymour_ _______ Office Engineer_ __________________ Atlanta

J. C. Boyd ___________ Research Engineer_ ______________ Atlanta

M. E. Cox ____________ Construction Engineer__ __

Atlanta

W. F. Montgomery ____ First Division Engineer____________ Cartersville

E. A. Fish ____________ Second Division Engineer_ _______ Gainesville

W. S. Dennis _________ Third Division Engineer__ _________ Thomaston

Henry E. Newton _____ Fourth Division Engineer_ ________ Louisville

E. A. Stanley_________ Fifth Division Engineer_ __________ Moultrie

H. J. Friedman_______ Sixth Division Engineer_ __________ Waycross

ll

S. A. P. 1015-B, Thomas County, Route No. 35, Thomasville-Moultrie Road, Box Culvert Construction, 1932

December 15, 1932.
'l'o His Excellency,
Hon. R. B. Russell, Jr.,
Governor of Georgia,
Atlanta, Georgia.
DEAR SIR:
According to the law governing the duties of the Highway Board of Georgia, we herewith submit to your Excellency for your consideration a report of the activities of the Board for the Fiscal year ending June 30, 1932.
Construction totals about the same for the Fiscal year just closed as for the year ending June 30, 1931. \Ve have completed eight hundred and fifty miles of road and two miles of bridges. There were one thousand and sixty four miles of road placed under construction, completion of part of which will be carried into succeeding periods. Some projects completed but final estimate not passed are not included in tlw completed projects noted abow. To report these projects as completed before final settlement would confuse our records.
Our State retains a substantial lead over the ten South Eastern States in mileage completed with Federal Aid, due in part to greater Federal funds available, but mainly to the fact that the Board has devoted much construction to roads on the Federal System, the Government's share of which is nearly one-half.
There has been a saving to the public in projects completed owing to lower bids received in consequence of lower construction cost. However, the Board has used its revenue to the limit in improving the roads. thereby giving employment to as many as possible.
There has been a further saving bv a reduction in salaries of 10%, effective January 1st, 1932.
'l'he receipts of the Board from all sources durin; the year were $18,603,455.61 and the disbursements for all purposes were $20,7 56,283.30. Included in the Disbursements were Prison Farm Purchase $124,186.93, and W. & A. Rental Discount $540,000.00, these payments were a part of disbursements authorized at the last session of the General Assembly. There has been a decrease during the year in revenue received from Motor Vehicle Fees and Gas Tax, compared with 1931, of $560,643.59.
13

In the report of the Accounting Department you will find a percentage chart of re\'enue receipts and expense disbursements which shows as follows:
RECEIPTS From Motor Vehicle Fees ............................. 20.3% From Fuel Oil Tax ................................... 46. 8% From Counties, Cities, and Railroads. . . . . . . . . . . . . . . . . . . 4. 4% From Federal Aid and Flood Relief ..................... 28. 4% From Miscellaneous sources . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . 1%
DISBURSEMENTS For Construction ..................................... 81 . 6% For Maintenance .................................... 10.3% For Administration (Overhead) ........................ 2.4% For Land, Buildings, and Equipment ................... 2. S% For Prison Farm $124,186.93 .......................... 0. 6% For \V. & A. Rentals $540,000.00. . . . . . . . . . . . . . . . . . . . . . . 2. 6%
It will be noted that Administration (or Overhead) shows a reduction from the 1931 cost which was the lowest percentage of cost up to that year.
Your attention is invited to the various comments and statistics in the reports of each branch of the Department on the following pages for detail information of the accomplishments and activities of the Board.
Respectfully submitted,
J. W. BARNETT, Chairman.
14

December 16, 1932.
State Highway Board of Georgia:
Hon. J. W. Barnett, Chairman,
Hon. W. C. Vereen, .Member,
Hon. J. P. Wilhoit, Member,
Atlanta, Georgia.
Gentlemen:
Following I submit in detail, my accountability as your Treasurer.
This accountability is included in and comprises the report of the accounting department.
I trust the report will meet your approval and I thank each member of the Board for the confidence and co-operation shown
Respectfully submitted, F. P. Vanstory, Treasurer.

State Highway Board of Georgia:
Hon. J. W. Barnett, Chairman,
Hon. W. C. Verneen, Member,
Hon. J.P. Wilhoit, Member,
Atlanta, Georgia.

September 21, 1932.

Gentlemen: On the following pages of this report will be found a detailed
statement of work performed and in process, by each engineering unit.
There have been completed and placed under construction road and bridge projects to compare favorably with the preceding year.
The progress of surveys, plans, and State forces are up to expectation.
Maintenance has an increased mileage well serviced.
Laboratory and Research work are efficient and satisfactory.

Equipment shows continued improvements.
I beg to acknowledge the help and co-operation of the Board to me and my assistants.
Respectfully submitted, B. P. McWhorter,
State Highway Engineer.
15

--
.....
"'
Route 11. Hall County, Bridge West of Gainesville. Old Bridge at Left

ALPHABETICAL LIST OF COUNTIES, SHOWING COM'RS DIV., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE 1932, PERCENTAGE AT JUNE 30, 1932

County

-------

Appling Atkinson_
Bacon Baker_

----------

------
------

Baldwin -----

-----

Banks ------

--

--

Barrow__

----

----.

Bartow ____

--- --- ---

Ben Hill

-----

Berrien_

--

Bibb________ -----

Bleckley ___

---

Brantley__ -----

-----I

B r o o k s __

------

Bryan_ ---

-----

Bulloch __

----

Burke_____

----

B u t t s __

Calhoun_ ----

Camden_

------

------

Candler_ ----

------

CarrolL

. -------

Catoosa __ -- ----

Charlton___ -----

-- ----

Chatham ______ ------ ---

Chattahoochee

-------

Chattooga

Com. Div.
1 1 1 1 2 3 3 3 1 1 2 2 1 1 1 2 2 2 1 1 2 3 3 1 1 2 3

Cong. Dist.
11 11 11 2 10 9 9
7 3 11 6 12 11 11 1 1 1 6 2 11 1 4 7 11 1 4 7

Eng. Div.
6 6 6 5 4 2 2 1 5 5 3 4 6 5 6 4 4 3 5 6 4 1 1 6 6 3 1

Area Sq. Mi.
454 330 271 357 307 222 168 471 256 455 277 205 434 514 131 668 956 203 284 711 228 492 169 792 370 218 328

Popu- Pop. lation Sq. Mi.

13,314 6,894 7,055 7,818 22,878 9, 703 12,401 25,364 13,047 14,646 77,042 9,133 6,895 21,330 5,952 26,509 29,224 9,345 10,576 6,338 8,991 34,272 9,421 4,381 105,431 8,894 15,407

29 21 26 22 74 44 74 54 51 32 278 44 15 41 14 39 30 46 37
9 39 70 56
5! 285
40 47

Mileage 6-30-31
62.715 49.343 32.!WJ t
32.770 I
44.200 29.400 35.076 59.434 13.301 56.160 49.165 32.425 27.048 73.450 62.038 70.590 81.595 31.058 40.100 42.303 27.050 72.890 13.431 19.238 58.316 37.840 32 .483

Percent- Percent-

Mileage

age

age

6-30-32 6-30-31 6-30-32

----- ----

62.715 .0087854 .0076511

49.343 .0069124 .0060198

32.940 .0046144 .0040186

42.670 .0045906 .0052057 44.893 .0061917 .0054769

36.650 .0041185 .0044712

33.339 .0049136 .0040673

66.954 .0083258 .0081683 19.201 .0018633 .0023425

56.160 .0078672 .0068515

49.165 .0068873 .0059980

32.425 .0045422 .0039558 48.548 .0837890 .0059228

75.785 .0102892 .0092457

62.056 .0886906 .0075707

72.211 .0893886 .0088097

93.092 .0114302 .0113571

31.058 .0043508 .0037890

53.950 .OJ56174 .0065818

57.103 .0059260 .0069665

27.050 .0037893 .0033001

74.310 .010'2108 .0090657 15.853 .0018815 .0019340

43.838 .0026949 .0853482

58.316 .0081692 .0071145

43.032 .0053008 .0052498

33.130 .0845504 .0040418

ALPHABETICAL LIST OF COUNTIES, SHOWING COM'RS DIV., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE 1932, PERCENTAGE AT JUNE 30, 1932

County

Com. Div.

C C

hlaerrkoek_e_e_______________________-_-_-_-_-_-_-

Clay _______________________

3 3 l

Clayton____________________ 3

Clinch_____________________ l

Cobb _____________________ 3

Coffee _____________________ l

Colquitt ___________________ l

Columbia__________________ 2

I-' 00

CCooowke_t_a___________________________________-_-_-

l 2

Crawford __________________ 2

Crisp ______________________ l

Dade_______________________ 3

Dawson____________________ 3

Decatur_ ___________________ l

DeiCalb ____________________ 3

Dodge _____________________ 2

Dooly______________________ 2

Dougherty_________________ l

Douglas ____________________ 3

Early ______________________ l

Echols _____________________ l

Effingham_________________ 2

Elbert_ ____________________ 3

EmanueL _________________ 2

Evans ______________________ l

Cong. Dist.
9 8 3 6 11 7 ll 2 10 11 4 6 3 7 9 2 5 12 3 2 5 2 ll l 8 12 l

Eng. Div.
l 2 5 l 6 l 6 5 4 5 3 3 5 l 2 5 2 4 3 5 l 5 6 4 2 4 6

Area Sq. Mi.
429 114 203 142 747 353 632 529 350 241 443 319 277 186 216 583 272 431 397 342 208 524 362 448 361 764 287

Popu- Pop. lation Sq. Mi.

20,003 25,613
6,943 10,260 7,015 35,408 19,739 30,622 8,793 ll ,311 25,127 7,020 17,343 4,146 3,502 23,622 70,278 21,599 18,025 22,306 9,461 18,273 2, 744 10,164 18,485 24,101
7,102

47 224
34 72
9~
100 31 58 25 47 57 22 63 22 16 41 258 50 45 65 45
35n
23 51 31 25

Mileage 6-30--31
41.799 30.570 37.411 28.610 67.811 52.797 33.156 77.880 34.000 44.470 74.490 45.320 41.651 24.100 32.384 54.392 33.837 48.490 45.515 24.827 18.640 55.900 26.800 35.000 74.100 107.257 20.578

Mileage 6-30--32

Percent- Percent-

age

age

6-30--31 6-30-32

56.579 35.886 37.411 38.772 69.311 49.782 58.380 77.880 52.513 44 .470 78.155 51.720 41.651 24.100 44.104 70.600 41.384 49.827 67.615 50.433 22.975 69.440 55.500 34.454 74.952 118.757 20.578

.0858554 .0042824 .0052407 .0040078 .0094993 .0073961 .0046447 .0109098 .0047629 .0062296 .0104349 .0063487 .0058347 .0033760 .0045365 .0076195 .0047401 .0067927 .0063759 .0034778 .0026112 .0078307 .0037543 .0049029 .0103803 .0150251 .0028827

.0069026 .0043780 .0045641 .0047301 .0084559 .0060733 .0071223 .0095012 .0064066 .0054252 .0095348 .0033098 .0050814 .0029401 .0053806 .OQ86132 .0050487 .0060789 .0082489 .0061528 .0028029 .0084716 .0067709 .0042033 .0091441 .0144881 .0025105

ALPHABETICAL LIST OF COUNTIES, SHOWING COM'RS DIV., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE 1S32, PERCENTAGE AT JUNE 30, 1932

County

Com. Div.

Fannin__ . _________________ 3

Fayette ____________________ 2

Floyd______________________ 3

Forsyth____________________ 3

Franklin___________________ 3

Fulton_____________________ 3

GGillamscero_c_k_______________-_-_-_-__-_-_-_-_-_-_-

3 2

Glynn_____________________ 1

Gordon____________________ 3

GGrreaednye________________________________-_-_-_-_-

1 3

Gwinnett_ _________________ 3

Habersham _________ .. ______ Ffall _______________________

3 3

Hancock___________________ 2

H a r a l s o n ___________________ Harris _____________________ Hart _______________________

3 2 3

Heard _____________________ 2

Henry __________________ .. __ 2

H o u s t o n ___________________ Irwin ______________________

2 1

Jackson ___________________ 3

Jasper_ ____________________ 2

Jeff Davis _________________ 1

Jefferson___ --------------

2

Cong. Dist.
9 6 7 9 8 5 9 10 ll 7 2 8 9 9 9 10 7 4 8 4 6 12 11 9 6 11 10

Eng. Div.
1 3 1 2 2 1 1 4 6 1 5 2 2 2 2 4 1 3 2 3 3 3 5 2 3 6 4

Area Sq. Mi.
401 234 502 247 279 541 440 170 439 375 444 416 440 290 437 530 284 501 261 285 324 443 378 355 321 300 646

Popu- Pop. lation Sq. Mi.
12,969 32 8,665 37 48,667 97 10,624 43 15,902 57 335,220 620 7,344 17 4,388 26 19,400 44 16,846 45 19,200 43 12,616 30 27,853 63 12,748 44 30,313 69 13,070 25 13,263 47 11,140 22 15,174 58 9,102 32 15,924 49 11,280 26 12,199 32 21,609 61 8,594 27 8,118 27 20,727 32

Mileage 6-30-31
45.008 23.610 78.997 28.300 51.540 37.880 35.372 14.375 53.804 56.245 56.020 60.300 72.470 39.570 76.454 62.800 34.711 43.560 48.690 39.170 44.950 63.850 42.480 58.340 60.250 24.836 90.000

Percent- Percent-

Mileage

age

age

6-30-32 6-30-31 6-30-32

45.008 23.610 88.367 37.390 60.840 78.582 51.759 25.975 53.792 56.245 56.020 60.300 94.020 53.870 75.887 62.800 36.065 43.560 57.940 45.570 44.950 63.850 46.230 72.003 60.250 24.806 101.400

.0063049 .0033074 .0110663 .0039644 .0072200 .0053064 .0049551 .0020137 .0075371 .0078791 .0078476 .0084471 .0101520 .0055432 .0107101 .0087973 .0048625 .0061021 .0068208 .0054871 .0062968 .0089444 .0059508 .0081726 .0084401 .0034791 .0126077

.0054909 .0028804 .0107807 .0045615 .0074224 .0095869 .0063145 .0031689 .0065626 .0068618 .0068343 .0073566 .0114703 .0065720 .0092581 .0076616 .0043998 .0053143 .0070686 .0055595 .0054838 .0077896 .0056400 .0087843 .0073504 .0030263 .0123706

ALPHABETICAL LIST OF COUNTIES, SHOWING COM'RS DIV., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE 1932, PERCENTAGE AT JUNE 30, 1932

County

Com. Div.

Jenkins __ ------- ---- ---

2

Johnson -- - -----

--------

2

Jones ______ - ---- -- -- -- -

2

Lamar ____ ---- -- --- ----

2

Lanier_ ____ ---- ----- ---

1

Laurens ______ - ----- ----

2

Lee _____

--------- ----

1

Liberty _ - - - ---

-------

1

Lincoln - ----- - --- --

---

3

'"' Long____

------ --------

Lowndes ___ 0

- - - - - - - -

-----

1 1

Lumpkin ____ ---- ---- --

3

McDuffie _______

--------

2

Mcintosh __ -- - - - ------

1

Macon _______ - ----

---

2

Madison .. ___ ---- ---------

3

Marion_ ---- -------- ---

2

Meriwether___ ----- -----

2

Miller ------ -

------

1

MitchelL -----

------

1

Montgomery__ - - -----

1

Monroe ____ ------ ----

2

Morgan ___ -----

- - ----

3

Murray_

------

-

3

Muscogee

--

2

Newton _____ ---

- ----

3

Oconee ---- - --- ----------

3

Cong. Dist.
1 12
6 6 11 12 3 1 10 1 11 9 10 1 3 8 4 4 2 2 12 6 8 7 4 8 8

Eng. Div.
4 4 3 3 6 4 5 1 2 6 5 2 4 6 3 2 3 3 5 5 6 3 2 1 3 2 2

Area Sq. Mi.
342 292 377 184 191 806 326 543 291 393 483 280 287 470 332 284 360 496 253 548 190 470 390 342 235 262 172

Popu- Pop. lation Sq. Mi.
12,908 38 12,681 44 8,992 24
9,745 53 5,190 27 32,693 40 8,328 25 8,153 15 7,847 27 4,180 11 29,994 62 4,927 18 9,014 32 5,763 12 16,643 50 14,921 53 6,968 10 22,437 45 9,076 36 23,620 43 10,020 53 11,606 25 12,488 32 9,215 27 57,558 245 17,290 66 8,082 47

Mileage 6-30--31
40.000 30.716 50.109 32.380 40.820 75.823 26.900 34.734 32.600 45.263 74.690 46.200 41.206 33.006 51.600 58.950 34.550 55.250 46.380 54.946 23.395 43.640 51.500 51.616 50.476 40.180 37.260

Mileage 6-30--32

Percent- Percent-

age

age

6-30-31 6-30--32

56.095 58.736 63.809 34.271 40.820 92.627 28.017 34.734 39.400 45.263 74.690 58.349 40.629 33.006 54.957 76.750 34.550 56.702 46.380 74.146 47.395 56.923 51.392 51.616 64.214 40.429 37.260

.0056035 .0043028 .0070195 .0045359 .0057183 .0106217 .0037683 .0048657 .0045668 .0063407 .0104619 .0064719 .0057723 .0046236 .0072284 .0082580 .0048399 .0077397 .0064971 .0076971 .0032773 .0061133 .0072284 .0072306 .0070709 .0056286 .0052196

.0068435 .0071658 .0077846 .0041810 .0049800 .0113003 .0034181 .0042375 .0048067 .0055220 .0091121 .0071185 .0049567 .0040267 .0067046 .0093634 .0042151 .0069175 .0056583 .0090457 .0057822 .0069445 .0062697 .0062971 .0078340 .0049323 .0045457

ALPHABETICAL LIST OF COUNTIES, SHOWING COM'RS DIV., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE 1932, PERCENTAGE AT JUNE 30, 1932

County

Com. Div.

Oglethorpe __ -- ---- ----

3

Paulding

------

3

Peach_________ ------ ---

2

Pickens _____ ---- ------- ---

3

Pierce_______ -----Pike ________ - ----Polk ______________

---

-----
--

1 2 3

PulaskL ________

---

2

Putnam_______

----

2

Quitman_______

----

1

Rabun ________

----- -

3

R a n d o l p h _____

---

--

1

Richmond _______

2

Rockdale _________ -------

3

S S

cchrelevye_n___________________________-_-_-_-_-_-

2 2

Seminole____ ----- --- ---

1

Spalding____ --- ------

2

Stephens ---

-----

3

Stewart _________ ---

1

Sumter_ ________ ----------

1

Talbo Taliaf

et _r_r_o_____-_-_-_-____- __-_-_-__-_--_-

2 3

TTaayttlnora_l_l __________________-_-_-_-_-_-_-_-_-_-

1 2

Telfair_ _______ ----- ------

1

TerrelL ___________ ---------

1

Cong. Dist.
8 7 12 9 11 6 7 12 8 3 9 3 10 5 3 1 2 6 9 3 3 4 10 1 3 12 3

Eng. Div.
2 1 3 1 6 3 1 3 4 5 2 5 4 2 3 4 5 3 2 5 5 3 2 6 3 6 5

I Area Popu- Pop. Mileage
Sq. Mi. lation Sq. Mi. 6-30-31

504 12,927 26

58.500

324 12,327 38

20.854

179 10,268 57

30.519

231

9,687 42

44.821

345 12,522 36

21.896

237 10,853 46

38.931

317 25,141 79

40.692

258

9,005 35

54.685

361

8,367 23

58.800

144

3,820 26

36.660

377

6,331 17

40.290

412 17,174 41

39.080

319 72,990 229

68.036

119

7,247 61

8.958

154

5,347 35

28.783

794 20,503 26

46.100

240

7,389 31

15.900

209 23,495 112

38.693

166 11,740 71

25.659

411 11,114 27

67.950

456 26,800 59

76.580

312

8,458 27

45.846

212

6,172 29

13.000

466 15,411 33

68.860

340 10,617 31

33.760

373 14,997 40

35.995

322

18,290

57 I

29.641

Percent- Percent-

Mileage

age

age

6-30-32 6-30-31 6-30--32

--------

58.500 .0081950 .0071369

54.377 .0029216 .0066339

30.09D .0042752 .0036710

42.080 .0062788 .0051337

21.896 .0030673 .0026712

38.942 .0054537 .0047509

49.972 .0057003 .0060965

55.236 .0076606 .0067387

58.790 .0082370 .0071723

36.660 .0051355 .0044725

58.559 .0056440 .0071441

40.174 .0054745 .0049012

68.835 .0095308 .0033978

19.235 .0012549 .0023466

28.760 .0040321 .0035087

60.900 .0064579 .0074297

25.500 .0022.273 .0031110

39.262 .0054203 .0047899

25.659 .0035944 .0031303

67.300 .0095188 .0082105

75.718 .0107277 .0092375

56.546 .0064223 .0068986

24.986 .0018211 .0030482

68.860 .0096463 .0084008

62.560 .0047293 .0076323

55.882 .0050424 .0068175

42.168 .0041523 .0051444

ALPHABETICAL LIST OF COUNTIES, SHOWING COM'RS DIV., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE 1932, PERCENTAGE AT JUNE 30, 1932

County

Com. Div.

I
Cong. Eng. Dist. Div.

Area Sq. Mi.

Population

Pop. Sq. Mi.

Mileage 6-30-31

Mileage 6-30-32

Percent- Percent-

age

age

6-30-31 6-30-32

Thomas ___________________ 1

2

5

530 32,612 61

Tift_ ______________________ 1

2

Toombs____________________ 1

12

Towns ____________________

3

9

5
6 2

243 16,068 66

393 17' 165 44

181

4,346 24

T r e u t l e n __________________

2

12

4

262

7,488 29

Troup ___________________ - - 2

4

3

435 36,752 84

Turner __________________

1

3

5

231 11 '196 48

Tw Un

iigogns______________________-_-_-_-_-_-_-__-_-

2 3

12 9

4 2

314

8,372 27

324

6,340 20

WUpaslokner___-_-__-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-

2 3

6 7

3 1

317 19,509 61 432 26,206 60

WWaarleto_n________-_-_-_-_-_-_-_-_-_-

-

-

-

-

--
--

-
-

3 1

8 11

2 6

331 21' 118 64 771 26,558 35

WWaarsrhenin_g-to--n-_-_-_-_-_-_-_-_-_-_-__-_-_-_-_-

2 2

10 10

4 4

404 11' 181 28 669 25,030 37

Wayne _____________________ 1

11

6

615 12,647 20

Webster_ ________ ------- --

1

3

5

302

5,032 17

Wheeler_ _______________ --- 1

12

6

264

9,149 35

White__ --- - - - - - - - - - - - - - - -

3

9

2

245

6,056 25

Whitfield_ - --- -

-------

3

7

1

283 20,808 73

WWiillckoexs___-_-_-_-_-____--_- _-_-_-_-_-_-_-_-_--

1 3

12 8

5 2

403 13,439 33 458 15,944 35

Wilkinson_________________

2

10

4

472 10,844 23

Worth _______________ -----

1

2

5

651 21,094 32

T-------- Totals _____________

- - - - -

--

-----

58,725

2,908,506

--------

73.100 48.040 43.136 28.580 15.800 56.460 26.218 51.398 44.160 61.830 34.303 45.166 78.716 42.853 61.300 56.138 24.110 46.179 24.500 46.049 44.290 51.500 43.909 55.370
7,138.510

73.046 48.040 60.470 38.330 27.900 60.060 26.218 51.398 44.160 61.830 48.983 52.066 78.716 42.910 92.030 75.438 24.110 46.339 44.900 47.109 44.290 59.347 59.044 55.370

.0102402 .0067297 .0060427 .0040036 .0022133 .0079092 .0036727 .0072001 .0061861 .0086615 .0048053 .0063270 .0110269 .0060031 .0085872 .0078641 .0033774 .0064690 .0034321 .0064508 .0062043 .0072144 .0061510 .0077565

.0089116 .0058608 .0073772 .0046762 .0034038 .0073272 .0031986 .0062705 .0053874 .0075432 .0059758 .0063520 .0096033 .0052349 .0112276 .0092033 .0029414 .0056533 .0054777 .0057472 .0054034 .0072402 .0072033 .0067551

8,196.816 -- ------- ----------

Colquitt County. Bridge Over Ty Ty Creek Widened and Lengthened
Bridge Over Mill Creek Built by State Forces, Route No. 2, Whitfie ld County 23

State Routes 9--11. Union County, 2 Miles North of Neel's Gap. Mountain Laurel in Bloom

PART TWO
ACCOUNTING DEPARTMENT REPORT FOR FISCAL YEAR ENDED JUNE 30, 1932

Route 13. Proj . 222-A. Stephen County, Concrete Completed Nov. 1931

ACCOUNTING DEPARTMENT
FISCAL YEAR 1931-1932
The financial condition of the State Highway Board is reflected in Exhibit "A" Statement of Assets and Liabilities. A Reconciliation of the Fund Deficit, reflecting Fund Revenues, Appropriations and Allotments is given in Exhibit "B". Exhibit "C" reflects Revenue Receipts and Expense Disbursements. In Exhibit "D" is given a Summary of Construction, from the beginning of the State Highway Board to June 30, 1932. These four Exhibits are supported by various Schedules, which analyze the financial results for the fiscal year.
As stated in previous reports the Highway Board operates under the Budget System, therefore complete budgetary control is maintained over expenditures. In order to properly maintain budgetary control, the accounts in the Treasurer's office are not limited to just actual assets and liabilities, but include resources in the form of unearned estimated revenue for the fiscal year; likewise, other obligations in the form of appropriations of these revenues, specific allotments of the appropriations and encumbrances of the allotments.
Through the use of modern accounting and tabulating equipment, monthly statements are rendered accurately and promptly; notwithstanding the fact that the volume of detail handled is very large. A monthly Balance Sheet is prepared in order that the exact financial condition and budget position may be known at all times.
A Cost Accounting system has been installed for recording costs on State Force projects. The system is for recording the cost of each unit of product or division of work in order to facilitate comparison of such cost with the cost of other similar units or divisions let to contract. Although these records are separate and distinct from the general financial accounts, the completed project costs are the same, only shown under proper cost accounting classifications which reflect cost by units of work accomplished. There was no completed data available at the close of this fiscal year; however, in the future, valuable information will be obtained through this system of cost accounting.
In 1931 the General Assembly of the State of Georgia passed a State Budget Act and established a Budget Bureau. The State Highway Board is required to submit quarterly budgets to this Bureau. It was found necessary to make only a few minor changes in Budget procedure to conform with this act. The accounting classification used by this department so nearly conformed with the uniform classification prepared by the Budget Bureau that changes were unnecessary. It is interesting to note
27

the similarity of procedure and classifications; nevertheless it is quite natural, as both systems were designed in accordance with governmental accounting as advocated by leading authorities on this subject.
An audit has been made of this Department by the State Auditor for the period ended December 31, 1931 and the records were found in order, all funds being properly accounted for. The fullest co-operation has been received from the State Auditor's office, and, as stated in past reports, many constructive suggestions have been made by the examiners.
Route 63. Proj. G-1-40. Gordon County, Rock Cut, between Jasper a.nd Fairmount
28

Route 1. Harris County, Concrete Paving on Pine Mountain

Exhibit "A"

STATE HIGHWAY BOARD OF GEORGIA

STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES

JUNE 30. 1932.

ASSETS

Current Assets

Cash in Banks (Schedule No. l)

Treasurer's Account............... $ 499,226.10

Sub Treasury Accounts.... Payroll Account

163,253.14 32, 864.02 $

695, 343.26

State Treasurer... U. S. Government Vouchers in
Transit .............. . Accounts Receivable.................. Advances............................. .

694, 3C3. 24
86,535.44 46,240.23 54,003.08 $ 1,576,425.25

Deferred Assets
Inventory of Materials and Supplies Shop Jobs in Process................ Undistributed Charges............... Payrolls for Re-imbursement........
Total Proprietary Assets...

$ 113,062.21 9,412.73 68,451.66 70,430.45

261,357.05

. ..................... $ 1,837,782.30

Capital Assets

Land. Buildings and Equipment (Schedule No. 4)

Land................................. $ 176,335.25

Buildings........................... 308,411.95

Automobiles........................ 113,028.00

Trucks................ .............. 466,544.00

Tractors............................. 260,336.00

Other Road Equipment............ 423,487.00

Engineering Equipment...........

48,818.00

Office Equipment.................. Shop Equipment...................

51.848.50
62,325 .oo

Laboratory Equipment............ 17,543.00

Quarry Equipment..............

72,737.00 $2,001,413.70

Roads and Bridges (Exhibit "D") Construction Cost to date: On Closed Proiects...............$101. 510,717.27 On Open Projects................ 10,620,967.47

112,131.684.74

Total Capital Assets................................... ..

$ll4,133, 098.44

TotaL ......................................................... $115,970,880.74 30

STATE niGHWAY BOAF>D OF GEORGIA

Exhibit "A"

5TATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES

JUNE 30, 1932.

LIABILITIES, FUND BALANCES AND SURPLUS

Currer.t Liabilities
Accounts Payable Due to Counties. Surveys and Plans

none
106,604.86

Total Propriet::ry LiRbilities

106,604.86

Fund Balar.ccs (Sthedule No.6)
Construction Contracts and Allotments "Cnencumbered Balances (ScheduleNo. 6-Al----Less: Ccntract Participation.

$ 8,146,338.87 639.283.75

Net Cash I iabi!ity __

Less: Cash Participation

County Cash.

_________ $ 699,442.67

Fecenl Aid

], 310,482 87

CthEr Cash

10,476 89

7. f07. 055.12 2. 020,402.43

Net Cash State Liability__ _

Cther rnencumbered Allotments

Survey ProjEcts__

$

Maintenu::ce General

(t'chedu c Ko. 6-B)_ ___ _

Ccnrict Farm __

------- $ 5,486.652.69

136,041.86
67,112.55 73,703.27

276,857.68

l'nliquidated Purchase Crders, etc.

238.897.61

Tot&! Fund Balances
Capital liabilities and Surplus Capital Liabilities Deferred Liability to Counties, for Construction Advances Surplus Invested in Plant and Equipment. ___ ------------ __ _ Surplus Invested in Highways_

6. 002,407.98
$26.163,637.41 2, 00], 413.70
85,968, 0-!7 .33

Total Capital Liacilities ~nd Surplus

$114,133,098.44

Current Fund Ccficit

Ceficit State Fur.ds. Encumbrance against

1922-33 lnccmc- Exhibit "6"-_

Less: Unrecorded ResErves:

For Assets cf Doubtful Value,

County Cash Due___

$

For Revolving Fund to cover In-

ventories. Advcnces. etc.. _

$ 5,170,673.21

C99, 442.67 200,000.00

899,442.67

Deficit ~s per cooks._

----- $ 4,271.220.54 Dr.

TotaL

- nt5.970.880.74

31

STATE HIGHWAY BOARD OF GEORGIA

Exhibit "B"

RECONCILIATION OF FUND DEFICif, REFLECTING FUND REVENUE,

APPROPRIATIONS AND ALLOTMENTS

JULY 1, 1931 TO JUNE 30, 1932. FUND DEFICIT, JULY 1, 1931

4,365,814.19

FUND REVENUE

Revenue Received (Schedule No. 7) Motor Vehicle_______________________ $ 3. 778,430.05 Gas Tax_____________________________ 8, 701,965.17
Federal Flood Relief. Reimbursement_______________________________ 205,272 .42
Miscellaneous Income______________ 24,405.85

$12,755,074.49

Estimated Participation Accruals

Federal Aid Allotments ____________ $ 2, 480,002.63

County Cash (Collections)_________ 297,619.66

County Contract___________________ 59,929.63Dr.

Other Cash ____ --------------------Othe::: Contract.____________________

23,331.80 2,537.67 $ 2,743,562.13

Total Fund Revenue ---------------------------- ___________________ $ 15,498,636.62
------
Available for Allotments____________________________________________ $ 11,132,822.43

APPROPRIATIONS AND ALLOTMENTS

Continuing Allotments (Schedule No. 6) Construction Projects Regular Funds. __________________ $11,837,109 .95 Convict Outfit Appropriation___ 426,884.60 Asphalt Dept. Appropriation.... 387,978.40 Maintenance Appropriation_____ 27,583.30
Survey Projects ____________________ . Reconstruction Projects __________ _ Maintenance GeneraL ____________ _

$12,679,556.25 268,582.13 704 .27Cr.
2,041,444.53

Total Continuing Allotments --------------------$14,988,878.64

Non-Continuing Allotments (Schedule No. 6) Administration. General Administration Appropriation_.$ Maintenance Appropriation_____
Research and Analysis ___________ __ Enforcement of M. V. Law _______ _ Quarry ________________________ _ Equipment
Equipment Appropriation _______ $ Maintenance Appropriation.____
Shop _______________________________ _ W. & A. RentaL. ___________ _

413,663.72 37,736.48
83,507.80 202, 049.4 7

451,400.20 7,067.45 40,592.85 l, 643.69
285,557.27 159.05
540,000.00

Total Non-Continuing Allotments _______________ $ 1,326,420 51

Total Allotments_ --------------------------------$16,315,299.15
Continuing Appropriation (Schedule No. 6) Maintenance Appropriation _______ $ 2, 296, 465.05 Less: Allotments _________________ 2,308,268.56

Excess Allotments over Appropriation. Absorbed in Appropriation. Balance 7-l-31. _____ _

11, R03 5!Cr.

Total Allotments and Appropriations ___________________________ $

Fund Deficit. June 30. 1932_________________ ------------ ________________________ $

16,303,495.64 5,170,673.21

32

Bridge Over Nottley River, Built by State Forces, in Union County, Route 2

STATE HIGHWAY BOARD OF GEORGIA

Exhibit "C"-Page 1.

STATEMENT OF F.EVENUE 1\ECEIPTS AND EXPENSE DISBURSEMENTS

JULY 1, 1931 TO JUNE 30, 1932.

State Tra!l:urer
Motor Vehicle License Tax Fuel Oil Tax__

f\EVENUE F.ECEIPTS

3, 778,430.05 8,701.965.17$ 12,480,395.22

Counties Cash for Construction Construction Contract Credits __

297,619.66 502,392.77 $

800,012.43

Railroads. Cities. Etc. Cash for Construction Construction Contract Credits __

22, 790.77 38 70 $

22,829.47

U. S. Gov<rnment

Federal Aid Vouchers for Construc-

tion_____

-------------

Flood Relief Reimbursement

Voucher------------

5, 025,539.22 250,272.42 $ 5, 275,811.64

Miscellar.ecus lnccme_

24,406.85

Total Revenue Receipts__ _

---- $ 18,f03,455.61

EXPENSE DISBURSEMENTS

Administration (Schedule No. 8-A)
General Administration General Office _ Division Offices Warehouse. ___ _

___ $ 353,021.11 81,650.93 20,509.14 $

Research ____ _ Enforcement of M. V. Law. __ Quarry ________ _

455, 18l.l8
7,376.72 40,537.54 1,647.14 $

504,742.58

Construction (Schedule No. 8-B) Surveys Actual Surveys__ _ Plans __
Construction Supervision. Actual Construction_

- $ 180,480.44 74,936.09 $
-~---

255,416.53

_$ 769,599.22 15,910,059.96

16,679,659.18 $ 16,935,075.71

Maintenance (Schedule No. 8-C) General Supervision ______ _ Actual Maintenance_
Reconstruction Supervision Actual Reconstruction ____ _

_____ $

94,680.92

2, 022,984.30 $

------

_$

12,662.55

2, 117,665.22 12,662.55$

2,130,327.77

34

Exhibit "C"-Page 2.

STATE HIGHWAY BOARD OF GEORGIA

STATEMEN( OF FE\ ENUE RECEIPTS AND EXPENSE DISBURSEMENTS

JULY 1, 1931 TO JUNE 30. 1932.

EXPENSE DISBURSEMENTS-Cont'd.

Land. Buildings and Equipment (Schedule No. 8-D)
Administration Land and Buildings______________ .$ EQuioment.... ______________ _

2,868.78 19,695.97 $

22,564.75

Construction EQuioment....
Maintenance Land and Buildings________________ $ EQuioment _________________________ _

1. 239.90 380,987.27

117,158.39 382,227.17 $ 521.950.31

Legislative Transfers (Schedule No. 8-E) Prison Farm Purchase ______________ _
W. & A. Rental Discount. .......... .

$ 124,186.93
540, oco 00 $ 664,186.93

Total Exoense Disbursements_. ___ .

---------------- $ 20.756.283.30

Excess Disbursements over Receipts .. ________ _
ADD Excess Proori etary Assets over L iabilities. July 1. 193L. ______ _

2, 152,827.69 3,884,005.13

Excess Proprietary Assets over liabilities. June 30. 1932-Exhibit "A" ____________ _

1. 731. 177 .44

RECONCILIATION

Excess Proorietary Assets over Liabili-

ties (As above) Available for LiQuidation of Fund Balances ________________ _

Fund Balances. June 30. 1932. (Con-

tracts. Allotments. Purchase Orders.

Etc.)._____

__________ _

Fund Deficit (as ver booksl-Exhibit

"A"_____

--------------

1,731,177.44 6, 002,407.98 $ 4, 271.230.54

35

REVENUES &EXPENDITURES
CHART SHOWING RELATIVE AMOUNTS RECEIVED FROM DIFFERENT SOURCES AND RELATIVE A~NTS EXPENDED fOR DIFFERENT
PURPOSES FOR EACH DOLLAR JULY-1-1931 THROUGH JUNE-30-1932.

REVENUES

HIGHWAY
DOLLAR

con.S.,Irvc r/on
8/.6%
EXPENDITURES

Tctal Allotments

Net Encur:1trJnces

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF CONSTRUCTION JUNE 30. 1932.

Payments

Total Ch1fges

Cost to Complete

State

Exhibit "D"

Federal

County

Other

Total Allotments

Open Projects. __ _

$ 18.937. 304 87 $169,998.53 $10,620,967.47 $10,790. 966-00 $ 8, 146, 338-87 $13, 813, 508.06 $ 3, 825, 830-68 $ 1, 289. 439-86 $ 8, 526.27 $ 18, 937' 304.87

Closed Projects

Construction Com-

pleted, but final

settlement not

made with County_ 6, 573,494.62 _

6,573,494.62 6,573,494.62-

3,755,497.11 1,243,906.55 1,511,048.21 63,042.75 6,573,494.62

Closed, Settlement

with County______ 94,937,222.65 _

94,937,222.65 94,937,222.65-

40,645,242.42 29,128,009.01 24,699,376.79 464,594.43 94,937,222.65

Total Closed Pro-

jects. -----------$101.510,717.27 -------101.510,717.27101,510,717.27 _

-- $44,400, 739.53 $30,371,915.56 $26,210,425.00 $527,637.18 $101,510,717.27

Total Projects

120,448,022 14 169,998.53112,131,684.74112.301.683.27 8,146,338.87

Total Allotment Distribution _ Total Construction Funds Received __ _

58,214,247.59 34,197,746.24 27,499,864.86 536,163.45 120,448,022.14 52,727,591.9C 32,887,263.37 26,163,637.41 523,187.59 112,301,683.27

Total Construction Funds Due DEDUCT
Contract Participation to Reduce Encumbrance to Cash Basis..
Net Cost to Complete_. Net Construction Funds Due
State_______ _
Federal County Cash___ _ Other Cash
Total Funds Due.

$ 5,486.652.69$ 1,310,482.87$ 1,336,227.45$ 12,975.86$ 8,146,338.87

- ---- $ 639,283.751----
-- $7,507,055.12

-- $ 636,784.78$ 2,498 97$ 639,283.75

$ 5, 486,652.69 -----$ 1,310,482.87 -- $

699,442.67 -- $ 10,476.89 $ 7,507,055.12

c.> 00
Surface Treated Road Between Blue Ridge and McKaysvWe, Route 6, Fannin County

Schedule No. 1 STATE HIGHWAY BOARD OF GEORGIA

BANK BALANCES

JUNE 30, 1932

Treasurer's Account Fulton National Bank, Atlanta __________ _

Sub-Treasury Accounts First National Bank, Atlanta____________ $

Citizens & Southern Nat'l Bank, Atlanta Empire Trust Co., Atlanta _______________ _

Fulton National Bank, Atlanta____ _ City National Bank, Albany_____________ _

Citizens & Southern Nat'l Bank, Athens_ National Bank of Athens ________________ _

Georgia Railroad Bk. & Tr. Co., Augusta_ National Exchange Bank, Augusta ______ _ Bank of Canton_________________ _

First National Bank, Cartersville _______ _ State Bank of Cochran__________________ _

First National Bank, Columbus _________ _

Fourth National Bank, Columbus _______ _

Hardwick Bank & Trust Co., Dalton ____ _ Citizens Banking Co., Eastman__________ _ Citizens Bank, Gainesville _______ _

First National Bank, Gainesville ________ _ Pickens County Bank, Jasper_ __________ _

First National Bank, Lavonia _______ _

First National Bank, Louisville __________ _

Citizens & Southern Nat'l Bank, Macon __ First Nat'l Bk. & Tr. Co., Macon _________ _ First Nat'l Bank, Marietta ___________ _

Moultrie Banking Co., Moultrie National City Bank, Rome __ _

Liberty Nat'l Bk. & Tr. Co., Savannah___ _ Bank of Screven County, Sylvania _____ _

Citizens & Southern Nat'l Bank, Thomas-

ton__

___________ _

Citizens & Soc;.thern Nat'l Bank, Valdosta

Washington Loan & Banking Co.. Wash-

ington_ __________

__________ _

$
11,352.45 488.33
4,960.86 3,612.33
594.57 20,080.95 14,087.87
104.32 1,234.70 3,709.99 7,417.99 5,773.55 1 ,021. 72 3,165.75 3,828.52 2,149.25 3,259.14 14,978.73 10,185.56 5,735.11 5,301.50 1,108.72
301.14 7,435.47 19,934.90 5,584.24
979.13 3,519.09
594.37 387.01
365.88

499,226.10 163,253.14

Payroll Account First National Bank, Atlanta ________ _

32,864.02

Total Cash in Banks-Exhibit "A" ___ _

-$ -=6=95=,34-3-.2=6

39

Description

STATE HIGHWAY BOARD OF GEORGIA

LAND, BUILDINGS AND EQUIPMENT,

JUNE 30, 1932.

~

--~

--- -- - -

-------

Appraisal Value July 1, 1931

Additions For Fiscal Year 1931-32

Total June 30, 1932

Schedule No. 4 Depreciation For Appraisal Value
Fiscal Year June 30, 1932 1931-32

Land ____________________________ $ Buildings _______________________ _ Automobiles ____________________ _ Trucks _________________________ _ ~ Tractors ________________________ _ 0 Other Road Equipment _________ _ Engineering Equipment ________ _ Office Equipment_ _____________ _ Shop Equipment_ ______________ _ Laboratory Equipment __________ _ Quarry Equipment _____________ _
Total-Exhibit "A" _________ $

175,900.00 $ 306,458.00 136,558.00 385,010.00 282,263.00 409,932.00 53,292.00 54,492.00 56,934.00 21,675.00 82,258.00
~_,964, 77~00 _ !___

435.75 $ 3,672.93 31,424.55 262,096.52 73,034.34 127,430.53 6,745.00 7,531.65 10,252.84 CR673.80
52!_,_95Cl_:~!- $

176 '335. 75 $ 310,130.93 167,982.55
647,106.52 355,297.34 537,362.53
60,037.00 62,023.65 67,186.84
21,001.20 82,258.00

.50 $ 1,718.98 54,954.55
180,562.52 94,961.34 113,875.53 11,219.00
10,175.15
4,861.84 3,458.20
9,521.00

176,335.25 308,411.95 113,028.00
466,544.00 260,336.00 423,487.00 48,818.00
51,848.50
62,325.00 17,543.00
72,737.00

:,_'!?6, 722 .31_ =$==-co4=8=5=,3=08==c6=1=i~$=2=,0=0=1=,4=1=3=.o7=0=

Route 13. Ball County, Concrete Paving, Raised Edge Spillways

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ALLOTMENTS, APPROPRIATIONS, AND FUND BALANCES, ALSO
REFLECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS JULY 1, 1931 TO JUNE 30, 1932.

Not

Estimated

Fund Balances Participation Fund Balances

July 1, 1931 July 1, 1931 July 1, 1931

Allotmonts

Net Encumbrances

Expenditure~

Total Charges

Schedule No. 6-Page 1

Estimated

Net

Fund Balances Participation Fund Balances

June 30, 1932 June 30, 1932 June 30, 1932

ALLOTMENTS

Continuing Allotments

Construction. Surveys_

$6,391,128.14$5,789,594.48$12,180,722.62$12,679,556.25 $DR34 280.82$16,679,659.18$16,713,940.00$8,146,338.87$2,659,686.18$5,486,652.69

122,864.36-

122,864.36 268,582.13

11.90 255,416.53 255,404.63 136,041.86

136,041.86

Reconstruction_

13,366.82 __

13,366.82 CR704.27

12,662.55 12,662.55 _

Maintenance

(Schedule No. 6-B) 66,929.37 ----

66,929.37 2,C41,444.53 76,403.87 2,117,665.22 2,041,261.35

67,112.55

67,112.55

Convict Farm........ 197,890.20-

197,890.20 -------------

124,186.93 124,186.93

73,703.27

73,703.27

Total Continuing Allotments ..... $6,792,178.89$5,789,594.48$12,581.773.37$14,988,878.64$ 42,134.95$19,189,590.41$19,147,455.46$8,423,196.55$2,659,686.18$5,763,510.37

Non-Continuing Allotments Administration (Schedule No. 6-Cl Research (Schedule No. 6-C) __ __
Enforcement of M. V. Law (Schedule No. 6-C) __ _
Quarry !Schedule No. 6-C)_
Euuipment (Schedule No. 6-D)
W. & A. RentaL Shop ..

---------- $ 451,400.20 $ 3, 780.98 $ 455, 181.18 $ 451.400.20-

------------

7, 067.45

309.27

7. 376.72

7,067.45-

40,592.85 DR55.31

40,537.54

l. 643.69

3.45

1, 647.14

285,557.27 236,393.04 521.950.31

540,000.00-

540,000.00

159.05 DR159.05 ------------

40,592.85

------- -----

1,643.69- -------------

285,557.27
540, coo .00 -
159.05 -

Total Non-Continuing Allotments ..

------ $ 1.326,420.51 $ 240.272.38$ 1.566,692.89$ 1,326,420.51

Total Allotments . $6, 792, 178.89 $5. 789,594.48 $12,581. 773.37 $!6, 3!5, 299.15 $ 282,407.33 $20,756,283.30 $20,473,875.97 $ 8, 423, 196.55 $2,659.686.18 $5,763,510.37

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ALLOTMENTS, APPROPRIATIONS, AND FUND BALANCES, ALSO
REFLECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS JULY 1, 1931 TO JUNE 30, 1932.

Schedule No. 6-Page 2

Net

Estimated

Fund Balances Participation Fund Balances

July 1, 1931 July 1. 1931 July 1, 1931

Allotments

Net Encumbrances

Eipendltures

Total Ch,o

Estimated

Net

Fund Balances Participation Fund Balances

June 30, 1932 June 30, 1932 June 30, 1932

APPROPRIATION--

Continuing

Maintenance Ap-

propriation _______ $ 11.803 51_

11.803.51 $ 2,296,465.05 Appropriation

2,308,268.56 CR Allotments

------------------------------1--------------- --- -------

Total Appropriation ______________ $ 11,803.51 ___ -------$ 11,803.51 $ 11,803.51 CR_ __________ _

Net Fund Balances. July 1. 1931. .. ____ $6,803,982.40

Estimated Participation. July 1.

1931 ------------ -------------- $5,789,594.48

Fund Balances. JuL.,- 1. 193L--------

__ $12,E93,576.88

Allotments for Year-Exhibit "B" ______

_ $16.303,495.64

Encumbrances for Year-Net Liquidation

$ 282,407.33

Expenditures for Year-Exhibit "C" _

- $20,756,283 .3G

Rota! Charges tor Year._

---- $20,473,875.97

Fund Balances. June 30. 1932.

------------- $8,423,196.55

Estimated Participation. June 30. 1932

$2,659,686.18

Net Fund Balances. June 30. 1932.. ______ _

------ $5,763,510.37

ADD

Unliqu!cl.ated Purchase Orders. Etc. ____ _

238,897.61

Total Fund Balances. Net, June 3C, 1932-Exhibit "A"

---$6,002.407.98

Schedule No. 6-A

STATE HIGHWAY BOARD OF GEORGIA

DETAIL OF CONSTRUCTION UNENCUMBERED ALLOTMENTS, BY CLASS OF PROJECT

JUNE 30, 1932

Unencumbered Allotments

Contracts Contractors ____________________________ $ 3,500,365.02

Less: R. R. Contract Participation__

2,498.97$ 3,597,866.05

Counties Cash Payments Contracts_ __ ____________ $ 2, 677, 104 .89
Less: Contract Partipation___ ____________ 469,598.88

2,207,506.01

Deferred Payment Contracts _________________ $ 1,003,617.00

Less: Contract Participation________________

68,128.88

935,488.12

Future Paving Contracts ________________ $ Less: Contract Partici-
pation _______________ _

364,983.53 99,057.02

265,926.51 3,408,920.64

TotaL ___________________ _

_____________ $ 7,006,786.69

State Force Allotments Divisions and Route !l Allotments _____ _
Asphalt and Convict Forces Allotments

99,928.62 400,339.81

500,268.43

Net Unencumbered Allotments-Exhibit "A" _______ $ 7,507,055.12

44

Route 63. Proj. 2--69, Between Gainesville and Dawsonville. Top Soil and Gravel
Berrien County, Bridge Over New River Built by Convicts 45

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-B

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

Unencumbered Allotments July 1, 1931

Allotments

JUNE 30, 1932.
-

- - -- - - -~- - ~ --~ - -

----

Net Encumbrances

Expenditures

Total Charges

Unencumbered Allotments
June 30, 1932

DIVISION NO. 1.

1-4 ____________ $ 4,015.76 $ 21,086.59 $

11 --65 -__- _-_-_-_-_-_-_-_-_-_-

2,443.850R 1,044.62

18,933.20 7,758.26

1-7-- - ---------

1' 710.49

163,496.78

1-9----- ------

1,546.330R

48,767.84

830.37 $ 25,493.97 $ 24,663.60 $

311.97

16,096.80

15,784.83

391.45

7,957.40

7,565.95

7,248.56

165,862.63

158,614.07

1,877.02

48,114.89

46,237.87

Totals ______ $ 2,780.69 $ 260,042.67 $ 10,659.37 $ 263,525.69 $ 252,866.32 $

438.75 704.52 1,236.93 6,593.20 983.64
9,957.04

DIVISION NO. 2.

2-5 - - - - - -- - - --- $ 2-8 ___ --------2-9 ____________ 2-10- --- ---- -
Totals ______ $

233.12 $ 12,385.76 9,485.31
252.380R
21,851.81 $

10,711.80 143,710.01 156,187.55 12,181.95
322,791.31

$

390.96

7,128.26

5,329.22

144.74

$ 12,993.18

$ 10,178.44 158,381.91 166,878.32 11,223.37
$ 346,662.04

$ 9, 787.48 151,253.65 161,549.10 11,078.63
$ 333,668.86

$ 1,157.44 4,842.12 4,123.76 850.94
$ 10,974.26

Schedule No. 6-B-Cont'd. STATE HIGHWAY BOARD OF GEORGIA DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1932.

Unencumbered
Allotments July 1, 1931

Allotments

Net Encumbrances

Expenditures

Total Charges

Unencumbered
Allotments June 30, 1932

DIVISION NO. 3.

3-3 _______ ---- $

490.910R $ 48,817.12 $

3-4 _______ ---

4,665.25

119,487.28

3-6___----- --

1,540.91

146,649.16

3-12-- ---------

426.15

39,702.13

1, 750.45 $ 48,242.52 $ 46,492.07 $

5,157.97

124,479.33

119,321.36

3,520.39

145,515.96

141,995.57

1, 953.26

41,046.75

39,093.49

1,834.14 4,831.17 6,194.50
1,034.79

Totals ______ $ 6,141.40 $ 354,655.69 $ 12,382.07 $ 359,284.56 $ 346,902.49 $ 13,894.60

4-1 ____________ $ 4-8 ____________ 44--1120_-_- _-_-_-_-_-_-_-_-_-
Totals ____ - $

6,111,510R $ 4,237.47 13,791.43 3,642.29
15,559.68 $

102,455.14 10,645.71
142,224.82 102,080.27
357,405.94

DIVISION NO. 4.

$ 3,335.51 409.31
6,157.16 667.31
$ 10,569.29

$ 96,525.45 14,663.61 156,494.73 105,581.02
$ 373,264.81

$ 93,189.94 14,254.30 150,337.57 104,913.71
$ 362,695.52

$ 3,153.69 628.88
5,678.68 808.85
$ 10,270.10

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-B-Cont'd.

DETAIL OF MAINTENANCE UNENCUMBERED ALI,OTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1932.

Unencumbered
Allotments July 1, 1931

Allotments

Net Encumbrances

Expenditures

Total Charges

Unencumbered Allotments
June 30, 1932

DIVISION NO. 5.

5-2 ____________ $ 12,269.94

5-L ______ ----

2,649.93

$ 175,730.78 108,406.06

$

5--11_ __

---

4,260.98

86,538.05

5-12___ - -- ---

241.220R

21,389.32

-

6,042.61 $ 194,082.87 $ 188,040.26 $

2,458.17

112,647.54

110,189.37

1,300.18

90,041.41

88,741.23

88.25

21,136.18

21,047.93

Totals

- $ 18,939.63 $ 392,064.21 $

9,889.21 $ 417,908.00 1$ 408,018.79 $

39.540R 866.62 2,057.80 100.17
2,985.05

DIVISION NO. 6.

6-l__ ________ - $ 6-1L __________ 6-12 ___________

2,479.080R $ 3,876.71
258.53

110,401.79 198,323.00 50,358.36

$

8,282.79 5,169.83 1,859.70

$ 111,258.98 197,633.40 48,127.74

$ 102,976.19 192,463.57 46,268.04

$

4,946.52 9,736.14 4,348.84

Totals_ ____ $ 1,656.16

$ 359,083.14

$ 15,312.32

$ 357,020.12

$ 341,707.80

$ 19,031.50

G. 0. Signs _______ ------ ------- $

3,406.85CR $

3,406.85

----- ----

--

---------

*3,406.85CR ------------------

Bridge Paint

Crews _________ ------------- $

1,191.58CR $

1,191.58

----

----- ----

$

*1, 191 .58CR ------------------

Totals __ --- $ 66,929.37

$ 2,041,444.53

$ 76,403.87

---- ----------------
$ 2,117,665.22 $ 2,041,261.35 $ 67,112.55

---

*-Expenditures for Signs and Bridge Paint Crews are pro-rated to the Divisions.

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-B-Cont'd.

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1932.

Unencumbered
Allotments July 1, 1931

Allotments

Net Encumbrances

Expenditures

Total Charges

Unencumbered Allotments
June 30, 1932

Div. No. L ____ $
2__ ____ 3__ ____ 4__ ____
5__ ----
6__ ____
Totals --- $

2,780.69 21,851.81 6,141.40 15,559.68 18,939.63
1,656.16
66,929.37

SUMMARIZED BY DIVISION UNITS

$ 260,042.67 322,791.31 354,655.69 357,405.94 392,064.21 359,083.14
$ 2,046,042 .96

$ 10,659.37 12,993.18 12,382.07 10,569.29 9,889.21 15,312.32
$ 71,805.44

$ 263,525.69 346,662.04 359,284.56 373,264.81 417,908.00 357,020.12
$ 2, 117, 665 .22

$ 252,866.32 333,668.86 346,902.49 362,695.52 408,018.79 341,707.80
---
$ 2,045,859.78

$ 9, 957.04 10,974.26 13,894.60 10,270.10 2,985.05 19,031.50
$ 67,112.55

UNDISTRIBUTED BY DIVISION UNITS.

G. 0. Signs ____ ----------------- $ Bridge Paint
Crews ________ -----------------

3,406.850R $ 1,191.580R

Totals ______ ------------- --- $

4,598.430R $

Totals ______ $ 66,929.37 $ 2,041,444.53 $

3,406.85 1,191.58 4, 598.43 76,403.87

-- $

3,406.850R ------------ -

------

--

1,191.580R ------------------

-- $

4,598.430R -----------

$ 2,117, 665 .22 $ 2,041,261.35 $ 67,112.55

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-B-Cont'd.

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1932.

~

~

~

Unencumbered Allotments July 1, 1931

Allotments

Net Encumbrances

Expenditures

Total Charges

Unencumbered
Allotments June 30, 1932

Dist. No. L_ __ $

2~~ ~-

3_~--

4~~--

<n
0

5 ~-- ~
6-~--

7~~- ~

8 ___ -

9~-- ~
10__ --

11__- ~

12 ~ ---

SUMMARIZED BY CONGRESSIONAL DISTRICTS

8,590.590R $ 212,856.93 $ 11,618.30 $ 207,784.43 $

12,269.94

175,730.78

6,042.61

194,082.87

2,159.02

157,223.18

4,208.62

160,890.06

8,681.01

140,573.87

5,988.34

149,973.30

2,210.730R

29,645.00

702.93

26,275.24

2,585.53

154,407.42

3,911.84

153,473.36

1, 710.49

163,496.78

7,248.56

165,862.63

16,623.23

154,355.72

7,537.57

173,045.52

7,938.98

204,955.39

7,206.24

214,993.21

13,539.05

154,406.77

6,301.90

167' 718.10

8,137.69

284,861.05

6,470.01

287,674.81

4,085.75

213,530.07

4,568.52

215,891.69

196,166.13 188,040.26
156,681.44 143,984.96 25,572.31 149,561.52
158,614.07
165,507.95 207,786.97 161,416.20 281,204.80
211,323.17

$ 8,100.21 39.540R
2,700.76 5,269.92 1,861.96 7,431.43 6,593.20 5,471.00
5' 107.40 6,529.62 11,793.94 6,292.65

Totals ____ ~ _ $ 66,929.37 $2,046,042.96 $ 71,805.44 $ 2,117,665.22 $ 2,045,859.78 $ 67,112.55

UNDISTRIBUTED BY CONGRESSIONAL DISTRICTS.

G. 0. Signs _______ -----~------- $ 3,406.850R $ 3,406.85

$

Bridge Paint Crews_ ______ __________ _

l,l91.580R

1,191.58

3,406 .850R __ ~ ~ __ ~ _~ _~ _~ ~ ___ _ 1,191 .58 OR _~ __ ~ ~ ~ _~ ~ ~ ~ _~ __ ~ _

Totals ________ ~ ~ _~ ___ ~ _

~ $

4,598.430R $

4,598.43

----~~-~~~---~-~~~ $

4,598 .430R ~ _~ _~ ~ _~ _~ __ ~ _~ __ ~

Totals ______ $ 66,929 .37 $ 2,041,444.53 $ 76,403.87 $ 2' 117' 665 .22 $ 2,041,261.35 $ 67,112.55

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-C

DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS

JUNE 30, 1932.

Unencumbered Allotments July 1, 1931

Allotments

Net Encumbrances

Expenditures

Total Charges

Unencumbered Allotments
June 30, 1932

GENERAL ADMINISTRATION ALLOTMENTS.

$ G. 0, __________
G. 0. Mtnc. ____ Mtnc. Claims __ Magazine ______

-----------------------------------------------------------------

308,098.92 24,108.41
13,628.07 3,703.37

.0...1..

Totals ______ ----------------- $ 349,538.77

$ $ GENERAL OFFICE. 3,513.62 31.28DR
-----------------
------------------
$ $ 3,482.34

311,612.54 24,077.13 13,628.07 3,703.37
353,021.11

$ 308,098.92
24,108.41 13,628.07 3,703.37
349,538.77

WAREHOUSE.

Warehouse____ -I- _____________ ---1$ 20,509.94 1$

1$ 1$ .80DR

20,509.14

20,509.94

$ No.

L _________ 2 __________

---------------------------------

3__ --- - - ---4 ___________ 5 __________

-------------------------------------------------

6___ -------- -----------------

12,083.84 13,419.86
12,073.20 15,083.47
13,129.26 15,561.86

Totals ______ -----------------$ 81,351.49

Totals ______ ----------------- $ 451,400.20

$ $ DIVISIONS. 59.39 51.49
10.69 6.87DR
39.83 144.91

12,143.23 13,471.35 12,083.89 15,076.60 13,169.09 15,706.77

$

299.44

$ 3, 780.98

$ 81,650.93
$ 455,181.18

$ 12,083.84
13,419.86 12,073.20 15,083.47 13,129.26 15,561.86
$ 81,351.49
$ 451,400.20

----------------------------------------------------
------------------
------------------
1------------------
-------------------------------------------------------------------------------------------------------
------------------
------------------

- - ------

Unencumbered Allotments July 1, 1931

STATE HIGHWAY BOARD OF GEORGIA OTHER ADMINISTRATION ALLOTMENTS.
RESEARCH AND ANALYSIS. JUNE 30, 1932.
-----

Allotments

Net Encumbrances

Expenditures

Schedule No. 6-C-Cont'd.

----
Total Charges

--
Unencumbered Allotments
June 30, 1932

Tests ___ - - - - - - - - - - - - - - - - - - -

$

Research --- - -" - .. -

--

- - ----~-~--

Totals -----

-- $ - - -----

336.850R 1$ 7,404.30 7,067.45 1$

336.85 I
27 .58DR
309.27 $

$ 7,376.72
7,376.72 $

336.850R 7,404.30
7,067.45

---- -----

---------

--

. --

----+ Totals------1----- ____

ENFORCEMENT OF MOTOR VEHICLE LAW.

40,592.85

55 .3lDR 1$ 40,537.54

40,592.85 1------------------

QUARRY.

Totals __ Totals

______________ $

1,643.69 I$

____ -$---4--8-.3-0-3-.9-9--~$

3.45 $

1,647.14 1$

1,643.69

49 257 .4-1-- $-- :561."4o--~ $_ _4_9_,303 .99 -

-----------~------~-------~~

I_____ _
-~~~--_-_- _ - - - - -

STATE HIGHWAY BOARD OF GEORGIA DETAIL OF EQUIPMENT UNENCUMBERED ALLOTMENTS
JUNE 30, 1932.

Schedule No. 6-D

Unencumbered Allotments July 1, 1931

Ailotments

Net

Expenditures

Encumbrances

Admin._ ----

-----

:$
-----.

24,134.31

$

Constr._ --

---- ----

Maint. ____

-- ---

---

- --
-

59,373.49 202,049.47

- - - - - - - - - - - - -- ---- - -----------

Totals -----

- ------- - -$ 285,557.27

$

I

I' 5l7,,576894..5906DR
180,177.70 236,393 .04 1$

22,564.75 117,158.39 382,227.17
521,950.31

Total Charges

Unencumbered Allotments
June 30, 1932

$ 24,134.31 59,373.49 202,049.47

---

- - - - - - - - - - -
-- -------------

-

-------- -- ----------

$ 285,557.27

- - - - - - - - -

Schedule No. 7
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ESTIMATED PARTICIPATION, ALSO REFLECTING RECONCILIATION WITH REVENUE RECEIPTS
JULY 1, 1931 TO JUNE 30, 1932.

Description

Estimated Participation July 1, 1931

Fund Revenue Accrued

Revenue Receipts

State Treasurer Motor Vehicle_______________________________________________ $

Gas Tax_ _________________________________ ___________________ _

Counties "" Cash for Construction ____________________ $

724,531.98

,.. Contract for Construction________________ 1,199,107.18

Railroads, Cities, etc.

Cash for Construction____________________

9,935.86

Contract for Construction___________________________________ _

Federal Aid Cash for Construction____________________ 3,856,019.46 Flood Relief Reimbursement_. _______________________________ _
Miscellaneous Income __________________________________________ _

3,778,430.05 $ 8,701,965.17
272,530.35 59,929.63DR
23,331.80 2,537.67
2,480,002.63 250,272.42 24,406.85

3,778,430.05 8,701,965.17
297,619.66 502,392.77
22,790.77 38.70
5,025,539.22 250,272.42 24,406.85

Estimated Participation, 7-1-3L ____________ $ 5, 789,594.48

Fund Revenue Accrued _________________________________________ $ 15,473,547.31 ADD: Reduction in Reserve for Doubtful
County Cash Due _____________________________________________ :::--c:-:o---=25:::-''-::0c:-89~.3"'"1_

Fund Revenue-Exhibit "B"_______________________________ $==15='=,4=9=8=,6=3=6=.6=2==

Revenue Receipts-Exhibit "C" ____________ _____

____________________________ $

Estimated Participation,6-30-32-Exhibit''A''

18,603,455.61

Estimated Participation June 30, 1932
--------------------------------------$ 699,442.67
636,784.78 10,476.89 2,498.97 1,310,482.87 ------------
----------
$ 2,659,686.18

STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE JULY 1, 1931 TO JUNE 30, 1932

Schedule No.8

(Analysis)

(Analysis)

(Analysis)

(Analysi8)

(Analysis) (Schedule

Total

MEMORANDUM

(Schedule

(Schedule

(Schedule

(Schedule

No. 8-EJ

Net Expense

OBJECT OF EXPENDITURE

No. 8-A)

No. 8-B)

No. 8-C)

No. 8-D)

Legislative Disbursements Net Expense Inter-Depart-1 Gross Expense

Administration Construction Maintenance Equipment

Transfers

Disbursements mental Billings Disbursements

----- ------- ------- --------- ----- -------1-----1-------

Personal Services.................. $ Equipment Expenses.............. Equipment Purchases............ Communication Services........ Heat, Light, Power and Water ..

339,936.50 $ l,034,386.0ii $ 1' 083,886.54 ---------

-------------- $ 2,458,209.09 $ 2,458,209.09$

18,378.37 254,987.78 725,836.46 -----

999,202.61 999,202.61

-----------

------- ---- ........ $ 521,950.31 -------------

521.950.31 521,950.31

19,253.17

4,719.97

7,191.51

31,164.65 31,164.65

5,017.11

1,755.21

1,101.36

7, 873.68

7,873.68

168,712.60 $ 2,626,921.69 7,165.97 l, 006,368.58
----------- 521.950.31 688.98 31,853.63
3,847.09 11,720.77

Rents .............................

6, 201.52

8, 707.05 19,353.41

34,261.98 34,261.98

1.00 34,262.98

Traveling Expenses............ Supplies and Materials.......... 0011 Insurance .. __________ ...........
Printing, Binding, Publicity, etc. Claims. ___ ._. _____ . _____ ... _._ .. -
Payments to Contractors........ Special and Misc. Expenses .....

44,596.04 113,763.07

9, 023.50 807,465.63

15,813.08

4, 641.67

5, 226.20

181.40

25,379.64

----------- 14,591,795.10

15,917.45 112,672.78

29,385.96 226,805.98 ... 17,963.86 ----
41.52
18,155.46 605.71 ...

187,745.07 187,745.07

2, 821.53 190,566.60

l, 043,295.11 1, 043,295.11 176,603.17 l, 219,898.28

38,418.61 38,418.61

687.10 39,105.71

5,449.12

5, 449.12 ---

5, 449.12

25,379.64

25, 379.64 ----

25,379.64

------------- 14,609,950.56 14,609,950.56 -------------- 14,609,950.56

664,186.93 793,382.87 793, 382.87

1,364.53 794,747.40

Total Administration-Exhibit

"C" ......................... .. 504,742.58

Total Construction-Exhibit "C" .. .. ..... $16,935,075 .7!

Total Maintenance-Exhibit "C" ... _ ............. _________ $2,130,327.77

Total Equipment-Exhibit "C".

............

.. _ $

Total Legislative Transfers-Exhibit "C"

Total Expense Disbursements-Exhibit "C".

521,950.31 ------ $

$20, 756, 283.30 $
664,186.93 -$20.756,283.30

361' 891.97 $21, 118, 175.27

NOTE: For Summary by Congressional Districts. see Schedule No. 9. For Summary by Division Units. see Schedule No. 10.

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1931 TO JUNE 30, 1932.

Schedule No. 8-A

OBJECT OF EXPENDITURE

GENERAL ADMINISTRATION

RESEARCH AND ANALYSIS

Inter-Depart-

General

mental

Net General Research and

Administration Billings Administration Analysis

Inter-Departmental Billings

Not Research

Enforce of M. V. Law

Quarry

Total Net Expense Disbursements

Personal Services __
Equipment Expenses--
8; Communication Services _______ _
Heat. Light. Power and Water-. Rents ___ _
Traveling Expenses. Supplies and Materials___ _ Insurance._
Printing, Binding, Publicity, etc. Claims .. Special and Misc. Expenses __ _

TOTALS.

- $

376,656.57 $ 63,300.91 $ 3!3,355.76 $ 23,088.22 $ 22,912.48$

!6,191.66 !9, 20!.63 5,0!7.ll

!6, 191.66 !9, 2Gl.63 5,017.ll

2, 252.53 33.44
1. 30!. 91

!, 604.93 33.09
1, 30!.9! -

6, 20!.52

6, 20!.52

30,978.27 --

30,978.27

2,410.62

2,C63.07

21. 0!4 .47 14,976.93 5,219.04

12,257.92

8, 756.55 !4, 976.93 5,219.04

4,0!5.12 24!.93 7.16 -

3, 797.23 24!. 93 -

25,379.64

25,379.64

9,903.07-

9,903.07

6, 057.33

76 90

- - - - - - - - - - - - -~--------

-------

--------------

530, 74G .01 $ 75,558.83 $ 455, 181.!8 $ 39,108.26 $

Total Administration Expense Disbursements-Exhibit "C"

175.74$ 647 6()
.35

25, 51H. 70 $ 1. 195 84
51 19

347.55 217.89
7 .Hi -

13,270.2234.64 !33 .OG

5, 980.43

33.95

7,37G.72 $ 40,537.54 $

886.30$ 43.27
14.42 703.15

339,936.50 18,378.37 19,253.17 5,0!7.ll 6, 20!.52 44.596 04 9,023.50 15,813.08 5, ?26 .20 25,379.64 15,917.45

1,647.14$ 504,712.58

------- $ 504, 712 .58

Schedule No. 8-B STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF CONSTRUCTION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1931 TO JUNE 30, 1932

Surveys

Construction

Total

Object of Expenditure

Expense Dis-

Actual

Plans

- - - 1 - - Total ISupervision[ Direct

Total

bursements

Personal Services ______________ $ 119,470.67 ____________ $ 119,470.67$ 599,624.78 $ 315,290.60 $ 914,915.38, $ 1,034,386.05

Equipment Expenses__________

6,855.28 ___ _________ 6,855.28 36,933.34 211,199.16 248,132.50

254,987.78

Communication Services_______

126.35 ____________

126.35 1,627.34

2,966.28

4,593.62

4,719.97

Heat, Light, Power and Water_

31.64 _____ ______

31.64

3.98

1,719.59

1,723.57

1,755.21

01 Rents_____ ___ _ ____ __ ____

144.47 ___ ________

144.47 1,159.02

--'~ TravelingExpenses _ _______ 46,990.76________ __ 46,990.76 65,213.50

7,403.56 1,558.81

8,562.58 66,772.31

8,707.05 113,763.07

Supplies and Materials________ 5,209.33 _ _____ ___

5,209.33 22,209.77 780,046.53 802,256.30 807,465.63

Insurance______________________ __ ______ _______ __ ____ ______

313.31

4,328.36

4,641.67

4,641.67

Printing, Binding, Publicity, etc. ___________________________
Payments to Contractors _____ _ Special and Miscellaneous Ex-
penses____ ________ __ ______ _

60 .65 -----------1,575.00------------
16.29$ 74,936.09

60.65 1,575.00
74,952.38

95.75

25 .00

120.75

181 .40

7,959.25 14,582,260.85 14,590,220.10 14,591,795.10

34,459.18

3,261.22

37,720.40

112' 672.78

-----1------ ------ ------ -- ---- 1-------

TOTALS _________________ $ 180,480.44 $ 74,936.09 $ 255,416.53 $ 769,599.22 $15,910,059.96 $16,679,659.18 $16,935,075.71

Total Construction Expense Disbursements-Exhibit "C"

$16,935,075.71

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF MAINTENANCE EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITUFiE

--~~- --~='----~~==-- ~

JULY 1, 1931 TO JUNE 30, 1932

--

~----=-~-=-~===--~-~-=,~==--~~---

GENERAL MAINTENANCE

RECONSTRUCTION

SHOP

Schedule No. 8-C

OBJECT OF EXPENDITURE

Total

Supervision

Direct

Total

Supervision Direct

Total

Shop

Inter-Departmental

Net Expense

Net

Disbursements

Billings

Shop

-------------- ------------ -------- ------------ --------- -----------------------

Personal Services_

___ $ 59.927.22 $ 1, 023,959.32 $ 1, 083,886.54

Equipment Expenses ~ Communication Services

6,364.30 6,014.01

719,472.16 1.177.50

725,836.467,191.51

Heat. Light. Power and Water_

202.72

Rents.

_____________ _ 2,693.40

898.64 16,660.01

1.101.36 ~ 19,353.41-

Traveling Expenses_

15,148.78

14,237.18

29,385.96

Supplies and Materials_________ _ 3,050.48 223,755.50 226,805.98

Insurance __ ----------

],238.49

16,725.37

17,963.86

Printing, Binding, Publicity,

etc________ ---------------

41.52 ~

41.52

Payments to Contractors

5,492.91

5,492.91 --

Special and Misc. Expenses~

605. 7l

605.71

82,499.21 $ 82,499.21

5,561.04 5, 561.04 --

655.89

655 89 -

2, 545.18 2,545.18

1.00

1.00

758.46

758.46

160,548.02 160,548.02

445.17

445.17

- $ 12,662.55 $ 12,662.55 ---~-------1, 287.63

1,287.63

$ 1,083,886.54 725.836.46 7,191.51 ], 101.36 19,353.41 29,385.96 226,805.98 17,963.86
41.52 18,155.46
605. 7l

TOTALS ______________________ $ 94,680.92$2,022,984.30$2,117,665.22------------$ 12,662.5f $ 12,662.55$254,301.60$254,301.60 ____________ $2,130,327.77

Total Maintenance Expense Disbursements- Exhibit "C"--------

------- $2,130,327.77

Schedule No. 8-D STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EQUIPMENT EXPENSE DISBURSEMENTS BY
OBJECT OF EXPENDITURE JULY 1, 1931 TO JUNE 30, 1932

Object of Expenditure Adminis- Construe- Mainte-

tration

tion

nance

Total Expense
Disbursements

Land and Buildings ____ $ 2,868.78 ----------- $ 1,239.90$ 4,108.68

Automobiles ____________ 12,000.76$ 12,020.01 7,403.78 31,424.55

Trucks _________________ Tractors ________________

--------------- --- - - - --

49,094.79 11,729.00

213,001.73 61,305.34

262,096.52 73,034.34

Road Machinery, Misc. _ ----------- 37,601.18 89,829.35 127,430.53

Office Equipment. _____ 7,092.07

439.58 -------------

7,531.65

Engineering Equipment

471.17 6,273.83 ------------

6,745.00

Shop Equipment _______

805.77 ----------- 9,447.07 10,252.84

Laboratory Equipment_ CR673.80 ------------ ---------- CR673.80

Totals ____________ $ 22,564.75 $117,158 .39 $382,227.17 $ 521,950.31

Total Equipment Expense Disbursements-Exhibit "0"_____ -$ -5-2-1,-9-50-.-3-1

Schedule No. 8-E
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF LEGISLATIVE TRANSFER EXPENSE DISBURSEMENTS, JULY 1, 1931 TO JUNE 30, 1932

Total

Object of Expenditure

Convict W.&A. Expense

Farm

Rental Disburse-

Discount

ments

--------------- -----1-----1----

SpecialandMisc.Expenses _____ $124,186.93$540,000.00$ 664,18~!1_3

Total Legislative Transfer Expenses DisbursementsExhibit "0"---------------------- ----------------------1$ 664,186.93

59

Proj. 476-B. Appling County, Sand, Asphalt Paving
Proj. 469. Habersham County, Bridge Over Sou. Ry., at Mt. Airy 60

Schedule No. 9 STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENSE DISBURSEMENTS BY
CONGRESSIONAL DISTRICTS JULY 1, 1931 TO JUNE 30, 1932

(Analysis) (Anaysis\ I (Analysis) l(Analysis)i Dis- (Schedule (Schedule (Schedule [(Schedule tricts No. 1C-Rl No. 10-C) No. 10-D) No. 10-E)
Construction Surveys Maintenance~ Recon-

1_ _ _ _ _ _ [

structiun _ _ _ _ _ _ _

Total

I$ No. l 1,677,583.27$ 16,773.42$

2 1,662,005.63 23,8E5.75

3 1,050,777.56 23,403.96

4

963,096.46 16,010.05

5

529,325.21 5,456.83

6 1 '012, 170 .75 22, 752 .39

7 1,075,718.36 29,198.19

8 1,407,276.79 25,526.97

9 1, 745 '469 .07 28,262 .30

10 1,642,772.53 12,464.72

11 2,430,433.76 27,386.66

12 1,483,029. 79 24,295.29

207,784.431$12,662.55 $1,914,803.67

194,082.87

1,879,974.25

160,890.06-

1,235,071.58

149,973.30-

1,129,079.81

26,275.24_

561,057.28

153,473 .36 ---

1' 188,396 .50

165,862.63

1,270,779.18

173,045.52

1,605,849.28

214,993 .21 -

1, 988,724 .58

167,718.10-

1,822,955.35

287,674.81___

2,745,495.23

215,891.691

1, 723,216.77

Totals. ,$16, 679,659 .18i$255, 416 .53 $2,117,665 .221$12,662 .55

Total Expense Disbursements Distributed by Districts ____ $19,065,403.48

Undistributed By Districts

Administration

General Office ___ _

___ $

Warehouse __________ __

Division Offices__ ________ _

353,021.11 20,509.14 81,650.93$455,181.18

Research________ __ __ _________

7, 376.72

Enforcement of M. V. Law _____________ 40,537.54

Quarry__________ ___________

1,647.14

Total Administration ____ _

$504,742.58

Land, Buildings and Equipment_

- 521,950.31

Legislative Transfers Convict Farm Purchase_____ W. & A. Rental Discount___

124,186.93 540,000.00 664,186.93

Total Expense Disbursements Undistributed by Districts_$ 1, 690,879 .82

Total Expense Disbursements-Exhibit "C" _____________ -~0, 7513_,28i3_.:3o

61

Divisions

STATE HIGHWAY BOARD OF GEORGIA
. SUMMARY OF EXPENSE DISBURSEMENTS, BY DIVISION UNITS JULY 1 1931 TO JUNE 30 1932

Schedule No. 10

Analysis (Schedule
I I No. 10-B) Construction

(Analysis) (Schedule No. 10-C) Surveys

(Analysis) (Schedule No. 10-D) Maintenance

(Analysis)

(Analysis)

(Schedule

(Schedule

I I I No. 10-E)

No. 10-A)

Reconstruction Administration

Total

No. L _________ $ 2 __________ 3 _________

4 _________

5 6

___________-_-_-_-

2,234,546.68$ 2,912,508.29
2,035,865.56 3,581,367.24
2,955,227.31 2,960,144.10

53,546.62$ 41,674.45
43,464.22 31,574.75
46,335.64 38,820.85

263,525.69 $ ----- ------------

346,662.04 -------- --- - ----

359,284.56 -------- ------

373,264.81$

11,877.90

417,908.00 ------ -----------

357,020.12

784.65

12,143.23 $ 13,471.35
12,083.89 15,076.60 13,169.09
15,706.77

2,563,762.22 3,314,316.13 2,450,698.23 4,013,161.30
3,432,640.04 3,372,476.49

Totals __ $ 16,679,659.18 $

255,416.53$ 2 ,117. 665 .22 $

12,662.55 $

81,650.93

0>
""

Und1sTtontbaultEedxpbeynsDelVDl.Si.slObnusrsements

Distributed.

by

Divisions __

----

-------

--------------------

- ----- $

Administration General Office __________________________ _

__________________________ $

Warehouse _____________________________ _

353,021.11 20,509.14 $

373,530.25

Research _________________________________________________________ _ Enforcement of M. V. Law _________________________________________ _ Quarry_ _____________________________________ _____________________ _

7,376.72 40,537.54
1,647.14

19,147,054.41

Total Administration ___________________ _
Land, Buildings and Equipment_ ____ _ Legislative Transfers
Convict Farm Purchase_____________________________________________ $ W. & A. Rental Discount_ ________________________________________ _

124,186.93 540,000.00

423,091.65 521,950.31
664,186.93

Total Expense Disbursements Undistributed by Divisions __________________________________________________ $ 1,609,228.89
------
Total Expense Disbursements-Exhibit "0"________________________________________________________________ $ 20,756,283.30

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS BY UNITS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 10-A

Furnishing

Heat,

Special

Personal Equipment Communi- Light,

Traveling Supplies

Printing,

and

Services Expenses cation

Power

F.ents Expenses and Insurance Binding, Claims Miscel-

Total

Services

and

Materials

Publicity,

laneous

Water

Etc.

Expenses

---- ------------------------------------------------------

GENERAL OFFICE Commissioners ______________ $ 29,608.23$ 1,515.51 ---------- ---------- ---------- $ 6,213.66---------- ---------- ------------ ---------- ---------- $ 37.337.40 General Engineering ______ _ 35,866.17 2,937.14 ---------- __________ ---------- 6,2C5.C4 ---------- ---------- ------------ ---------- ---------- 45,008.35 Construction _______________ _ 4,740.00 834.15------------------------------ 1,759.51 __________ ------------------------------------------ A7, 133.88
Plans for Roadways _______ _ 85,553.80 249.92---------- ---------- ---------- 488.99---------- ---------- ------------ ---------- $ 1,910.89 88,203.40 Plans for Bridges __________ _ 21,077.90 985.33 ---------- ---------- ---------- 1, 888.21 ---------- ---------- ------------ ---------- ---------- 23,951.44

Accounting__ --------------- 65,188.99 883.47---------- ---------- ---------- 3,324.08---------- ---------- ------------ ---------- ---------- 89,174.52

Statistics __ ----------- ______ _ Purchasing_________________ _
Maintenance._--------------

8,542.50---------- ---------- ---------- $ 2,982.47 ---------- $ 500.89---------- ------------ ---------- ----------
19,884.42 418.88---------- ---------- ---------- 201.00 ---------- ---------- ------------ ---------18,579.90 2,7C6.30 ---------- ---------- __________ 4,031.38----------$ 589.87 ____________ $13,628.07 189.68

10,005.88 20,302.28 37,705.20

Publications... ------------- 1,650.00 ---------- $ 274.27 ---------- 125.00 ---------- ---------- ---------- $ 1,644.10----------

10.00 B3, 703.37

Undistributed.. ____________ _ 19,877.86 2,444.70 12,437.80 4,798.88 425.85 419.35 15,991.84 7,953.80 3,520.73 10,942.94 7, 441.11 86,054.48

-------------------------------------------

TOTALS.. _________________ $ 306, 147.77 $12,573.38 $12,712.07 $ 4, 798.88 $ 3, 513.12 $24,531.20 $16,492.73 $ 8, 543.67 $ 5, 164.83 $24,571.01 $ 9, 531.48 $ 428,579.94

Less: BluePrint Billings.. 63,300.91 __________________________________________________ 12,257.92 __________ ---------------------- __________ 75.558.83

1----1---------------------

--------

TOTALS---- _______________ $ 242,846.86 $12,573.38 $12,712.07 $ 4, 798.68 $ 3, 513.12 $24,531.20 $ 4, 234.81 $ 8, 543.67 $ 5, 184.83 $24,571.01 $ 9, 531.48 $ 353,021.11

WAREHOUSE _____________________ $ 18,180.87$ 692.24$ 159.06$ 52.0(1 __________ $ 310.16$ 457.95$ 302.19------------ ---------- $ 354.67$ 20,509.14

A-This amount represents only last four months of fiscal year. Included in General Engineering for balance of year. B-This amount represents only last six months of fiscal year. Magazine taken over on January 1st. Income for corresponding period amounted to
$1,689. 76.

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS BY UNITS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 10-A-Cont'd.

Furnishing

Special

Heat,

Printing,

and

Personal Equipment Communi- Light,

Traveling Supplies

Binding,

Miscel-

Services Expenses cation

Power

F.ents Expenses

and

Insurance Pub I icity,

Claims laneous

Total

Services and Water

Materials

Etc.

----------- ---- ---- ---- ------ ----------1----

DIVISIONS

Expenses

NNoo.. OTwneo __-_-_-_-_-_-_-_-_-_-_-_-__-_-_-_-_--_- $ No. Three _________________ _ No. Four. __ ----------------

7,992.50$ 8, 892.50 7,767.G3 9,260.00

407.84$ 750.50 $ 531.75 785.23 430.77 1,133.47 453.62 1, 262.47

43.16 $
30.50
23 .co
60.77

465 00 $ 889.14$ 422.81 $ 1,165.54$

518.40
300 .oc

926.60 842.90

575.47 1, 002.56
737.98 838.57 -----

480.00 1,196.97 1, 025.23 I, 082.45

6.74 ---------- ---------- $ 18.05 $ 187.95$ 2.34
10.17 ---------255.09

12,143.23 13.471.35 12,083.89 15,076.60

No. Five No. Six __

8, 816.00 9,600.CO

319.20 904.39 7R2.86 1,4!)4.44

400.00 l, 009.41 482.89 1,021.02 9.00 525.00 1,271.89 819.-ll 1,020.93

1~ 68 12.71

199.50 ---------- 13,169 09

155.92

14.58 15,706.77

TOTALS ___________________ $ 52,328.03 $ 2, 926.C4 $ 6, 33C .EG $ 166.43 $ 2.688.40 $ 6.136.911$ 4. 063.79 $ 6.131.07 $

54.21$ 80863$ 16.92$ 81,650.93

TOTAL GENEF.AL

Administration_ _______________ $ 313,355.76 $16, 191.66 $19,201.63 $ 5, 017.11 $ 6, 201.52 $30,978.27 $ 8. 756 [5 $14.976.93 $ 5, 219.04 $25, 379.64 $ 9, 903.07 $ 455, 181.18
==== ------=--== ====--- ====~- ===== ==--- ===== ====--- - - - ---
RESEARCH AND ANALYSIS

Division of Tests ____________ $ 22,912.48$ 1,604 93$ 33C9$1,301.91 __________ $ 2,063.07$3,797.23$ 241.93 ___________ ----------$ 76.90$ 32,031.54

Division of Research________

175.74 647.60

.35----------

347 55 217.89-

7.16---------- 5,980.43 7,376.72

TOTALS __________________ $ 23,088.22$ 2,252.53$ 33.44$ 1,301.91 ---------- $ 2,410.62$ 4,015.12$ 241.93$

7.16 __________ $ 6,C57.33 $ 39,408.26

Less: Test Billings_________ 22,912.48 1,604.93

33 09 1,301.91 __________ 2,063.07 3,797.23 241.93 ------------ ----------

76 90 32,031.54

TOTALS _____________ _

175.74$ 647.60$

.35

--------- $ 347.55$ 217 89 --- ---- - $

7.16 --- -- $ 5,980.43$ 7,376.72

--~---~-- -------------------- - - - - - - - - - - - - - - - - - - - - - 1 - - - -

ENFORCEMENT OF M. V. LAW __ $ 25,518.70$ 1,495.84$ 51.19 ___________________ $13,270.22$ 34.64 $ 133.00 _____________________ $ 33.95 $ 40,537.54

:~:::YA~~;~-~~~R~~;~~-::::::.1~-~ f~~ ~~;,;; ;~ ~T~~J~~J~j: :~~j ~~ ~: =~i ~~

Schedule No. 10-B

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1931 TO JUNE 30, 1932 --

Personal Services

Equipment Expenses

Furnishing Comii\Uni- Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

lnsuranee

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and MiscelJan eo us Expenses

Total

CONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS

g; District No. L- $ 45,100.83 $ 3, 678.18 $ 208.81 ------------ ---------- $ 6,064.45$ 1,971.71 ---------- $

22.45 -------------- $ 3,054.12$ 60,100.55

a2_._-_-

54,662.61 37,246.93

2,802.70 2,483.48

214.83 $

3.98$ 113.00 5,196.72

108.17 ------------

35.00 4, 809.52

2,410.23$ 50 90 ------------ --------------

1,329.82 ----------

.95 --------------

3, 784.97 3, 270.94

69,239.94 49,284.81

4___

38, 137.94 2,044.84

24 86 ------------

74.50 4, 034.72 l, 586.82 ---------- ------------ -------------- 2,374.96

48,278.64

5 ___

23,078.93 l, 405.50

17.64 ------------

30.00 1,857.94

788 54 ---------- ------------ -------------- l, 340.46

28,519.01

6...

33,514.75 2, 280.07

50.82 ------------ ---------- 5,076.90 1,165.14 ---------- ------------ $

237.09 2,367.97

44,692.74

L

55,175.23 3,133.89

65.64 ------------ 380.87 4,879.55 1,920.51

55.90 ------------ -------------- 2,169.89

67,781.48

g_ __

64,646.48 3, 399.81 110.48 ------------

24 00 5, 577.80 l, 714.36 ---------- ------------ -------------- 3,217.24

78,690.17

9--

66,974.37 2, 828.54

87.12 ------------ 133.11 5, 263.62 l, 495 98

76 34 ------------ -------------- 2, 987.91

79,846.99

10.--

53, 193.33 3,859.17 163.53 ------------ 145.36 7,305.21 l, 653.70

50.92

3.23

7,722.16 2,473.87

76,570.48

1L_

75,119.64 5,444.36 380.48 ------------

45.00 9, 239.31 3,978.79

79.25

59.92 -------------- 4, 771.87

99,118.62

12 ...

52,773.74 3,572.80 194.96 ------------ 178.18 5,907.76 2,194.17 ----------

9.20 -------------- 2, 644.98 67' 475.79

1-----1----- ----------------- --------1-----1------1-----

TOTALS. ______ $ 599,624.78$ 36,933.34$ 1,627.34$

3.98$1,159.02$65,213.50$ 22,209.77$ 313.31 $

95.75 $ 7,959.25$ 34,459.18$ 769,599.22

Schedule No. 10-B-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1931 TO JUNE 30, 1932

-

--

Personal Services

Equipment Expenses

Furnishing Communi- Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

lnsur-
a nee

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total

CONSTRUCTION DIRECT BY CONGRESSIONAL Dl ST:.ICTS

Ol District No. L_ $ 18,676.95$ 6,013.57$ 11.25 ----- ------ $ 252 00 $ 438.63$ 13,473.27 --

------------ $ 1,578,617.05 ------------ $1,617,482.72

Ol

2___

35,741.91 15,277.47 246.15$ 104.15 134.25

17.17 40,587.52 $ 554.43 ------------ 1.500,101.12 $

1 00 1. 592, 765.69

L-

4, 461.32 3,997.71

56.30 -----

L_ -------------- ------------ ---------- ----------

57.22 ---------------- ----------

6,693.91

44.17 ------------

4, 289.67 ---------- ------------

986,040.85 910,528.15 --

141.47 1, 001,492.75 914,817.82

5___ --------------

6...

5, 608.66

1,017.89 ---------- ------------ -----------

3, 807.91

24.95 ------------

25.00

7,979.32 ---------- ------------

4 50 8, 962.40

41.86-

491' 809 .08 ---949,002.73 ------

500.806.20 967,478.01

L. 8___ g_ 10...

45,510.87 9, 930.97 97.986 .02 31,784.29

34, C27 .38 2,374.05 81,309.56 18,340.53

874.39 76.25
533 93
478 .so

446.87 2 33
178.84 443.54

289 .19 4,616.76 1. 583.00
146.66

384.60 29.17 460.16 22 38

101,218.96 12,003.77 153,341.66 115,568.56

740 70 ------

86 03 ------------

982.68 ~

25 00

684 72 ----

823,014.78 1,429.14

1, 299,767.29 ---------

1. 327,939.38 1,281.85

1, 398,724.13

8.44

1,007,936 88 1' 328,586.62 1, 665,622.08 1, 566,202.05

1L.

59,272.97 41, 131.25 606.09

543 34 509.48 190.80 225,645.57 1.143.41 -

2. 001,872.91

399.32 2,331,315.14

12 --

6, 316.64 3,901.84

58.17-

90 00

11.40 90,282.21

50 36 ------------ 1,314,843.38 --

1.415,554.00

TOTALS_. _____ $ 315,290.60$211,199.16$2,966.28$ 1.719.59$7,403.56$ 1,558.81$780,046 53$4,328.36$

25.00$14,582,260.85$ 3,261.22$15,910,059.96

Schedule No. 10-B-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1931 TO JUNE 30, 1932

--

--

Personal Services

Equipment
Exreme~

Furrishing Communi- Heat, Light,
cation Power and Services Water

Rents

Traveling Experses

Supplies and
Mat~iial~

lnsur .. a11ce

CONSTRUCTION SUPERVISION BY DIVISION UNITS

Printmg, Binding, Publicity,
Etc.

Payments to Contractors

Special and Misceilaneous Expense"

Total

Division No. L __ 2__ _

:'i

a__

4 __

5 __ _

6___

TOTALS-------

106,340.72 $ 125,499.29 71,661.33 105,377.65 99,141.72 91,604.07

5,306.28$ 6,390.11 4,837.24 8,136.81 5, 978.57 6,284.33

104 04 ------------ $ 618.48 $ 8,879.02$

204.09 ------------

24.00 10,535.88

68.77 ---

42.00 10, 203.25

343.79-

281.54 13,626 03

348.26 $

3.98 193 .CO 11,274.67

558.39 ------- ---- ---------- 10,694.65

4, 089.96 $ 106.79 ------------ -------------- $

2,688.47

76.37 -

-----------

2, 387.24 --

-$

237.09

4,279.31 ---------- $

22.90

7,722.16

3,983.91 104.70

5.89 --------------

4,780.88

25.45

66.96 -

4,980.15$ 5, 748.95 5,113.48 5,729.82 7, 777.92 5,108.86

130,425.44 151,167.16 94,550.40 145.520.01 128,812.62 119, 123.59

599,624.78$ 36,933.34$ 1,627.34$

3.98$ 1,159.02$65,213.50$ 22,209.77$ 313.31 $

95.75 $ 7,959.25$ 34,459.18$ 769,599.22

CONSTRUCTION DlilECT BY DIVISION UNITS

Division No. L __ $ 2--3 ___ 4 ___ 5 ___ 6 ___
TOTALS_______ $

61,971.06 $ 54,342.98 $ 973.02$ 618.35$ 741191$ 571.29 $ 171, 989 .46 $1,369.79$

25.00 $ 1, 809,366.86 $ 2,152.24 $ 2, 104,121.24

108,C39 .53 75,030.86 12,047.49 7,714.82

702.48

448.98 5,520.25

83.12 --- -----

115 .oc

306.11 155,705.10 15.90 54,728.19

952.28 ---- ------- 2, 414,065.56

569.98 2, 761,341.13

92 22 ------------ 1, 866,518.42 ------------ 1,941,315.16

16,248.23 70,326.55 46,657.74

8,157.74 334.17

4.25

86.67

22 .C6 119,908.22

172.06 --- ~-------- 3, 290, 91C .82

3.01 3, 435,847.23

51,083.42 713.48

613.66 336.22 156.32 129,187.04 1,398.94 ------------ 2, 572,063.07

535 99 2, 826,414.69

14,869.34 160.01

34.35 6C4 23 487.13 148,528.52 34307 ------------ 2, 629,336.12 ---- ------- 2,841,C20.51

- - - - - - - - - - - - ----- - - - - - - - - ----~ ------- - - - - - - - - - - -

315,290.60 $ 211,199.16 $ 2,966.28$ 1,719.59 $ 7,403.56 $ 1,558.81 $ 780,046.53 $4,328.36$

25 00 $14,582,260.85$ 3,261.22 $15, 91C, 059.96

Schedule No. 10-C STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1931 TO JUNE 30, 1932. -~

Personal Services

Equipment Expenses

Furnishing

Communi Heat, Light,

cation Power and

Services

Water

Rents

Traveling Expenses

Supplies and
Materials

lnsura nee

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total

SURVEY ACTUAL BY CONGRESSIONAL DISTRICTS

District No.
00

L. $

6,108.5S$

00

2 --

12,862.52

460.94 $ 6.10 ------------ ---------- $2,523.90$

830.64

16 35 $

10.15 $ 1C .29 4, 798.57

224.45 ---------- $

38.10 -------------- $

578.08 ---------- ------------ --------------

.90$ 9,362.98

.48

19, 107.08

3__

10,565.18

709.35

15.04 ------------

20.89 4,266.33

499.23 ---------- ------------ --------------

.85 16,476.87

4__

6, 712.19

329.29 15.46 ------------ ---------- 3, 531.14

571.68 ---------- ------------ --------------

1.52

11,161.28

5 --

3,971.29

122.53

1.00 ------------ ---------- 1,120.21

49.13 ---------- ------------ -------------- -----

5,264.16

6 --

12,356.85

658.54

7.70

2.49

32.00 4,843.24

639.72---------- ------------ -------------- ------------

18,540.54

7 --

15,808.65

8--

10,697.51

945.90 268.88

8.58

6 .cc

7. 75 ------------

20.00 5,407.57 16.06 4,666.22

567.89---------- ------------ $

622.60

21s 99 __________ ____________ ______________

1.39

23,388.58

1.1;:

15,876.56

9 --

14,035.C9

692.78

4.22

13.00

17.74 5, 248.07

396.51 ---------- ------------

952.40 ------------

21,359.81

10...

3,036.82

99.CO 12.25 ------------ ---------- 900.02

226.07 ---------- ------------ --------------

.61

4,274.77

1L. 12 ___

13,463.71 9, 452.27

l, 046.16 691.27

17.87 -----------14.03 ------------

14.CO 4, 5C5 .31 13.49 5,180.18

652.29 ---------58fi. 29

9.55 --------------

9.39

13.00 -------------- ------------

19,718.28 15,949.53

- - - - - - - - - - ~---

~--~~ ~--~ ---~ ~~--~

-----j~------j--~---- ~--~~~

TOTALS ______ _ 119,470.67$ 6,855.28$ 126.35$

31.64$ 144.47$46,990.76$ 5,209.33----------$

60.65 $ 1, 575.00 $

16.29 $ 180,480.44

Schedule No. 10-C-Cont'd. STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1931 TO JUNE 30, 1932

Personal Services

Equipment Expenses

Furnishing Communi .. Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

lnsuranee

SURVEY PLANS BY CONGRESSIONAL DISTRICTS

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total

District No. L- -------------- ---------------------- ---------- ----------- ---------------------- ------------------- -- --------------$ 7,410.44$ 7,410.44

2--- -------------- ----------- ------- -- ---- --

- ---------- ------------ -------- - ---------- - -------------- 4,778.67

4, 778.67

3_ - -------------- ------------ ---------- -------- --- ---------- ---------- ------------ ---------- ------------ -------------- 6, 927.09

6, 927.09

4___ -------------- ------------ ---------- ------------ ---------- ---------- ------------ ---------- ------------ -------------- 4,848.77

4,848.77

5.-- -------------- ------------ ---------- -----------

---- -------- - ------------

------------ --------------

192.67

192.67

6.- -------------- ------------ ---------- --------- -- ---------- ---------- ------------ ---------- ------------ -------------- 4, 211.85

4,211.85

7___ -------------- ------------ ---------- ------------ ---------- --------

5, 8C9 .61

5,809.61

8--- -------------- ------------ ---------- ------------ ---------- ---------- ---------- - ---------- ------------ -------------- 9, 650.41

9, 650.41

9___ ------------ - ------------ ---------- ------------ ---------- --------10 __ _

6, 902.49 8,189.95

6,902.49 8,189.95

1L_

7,668.38

7,668.38

12--

8,245.76

8,345.76

--------1--~--1----- - - - - - - - - - - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

TOTALS------- -------------- ------------ ---------- ------------ -------- - ---------- ------------ ---------- ------------ -------------- $ 74,936.09$ 74,936.C9

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10-C-Cont'd.

ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1931 TO JUNE 30. 1932.

Personal Sf!rvices

Equipment Experses

Furnishing

Communi- Heat, light,

cation Power and

Sl)rvices

Water

Rents

Traveling E>penoes

Supplies and
Materials

Insurance

SURVEY ACTUAL BY DIVISION UNITS
---------,------~------~---,------,---~

Printing, Bind!ng, Publicity,
Etc

Paymerts to Contractors

Special and Miscel .. la11eous Expenses

Total

Division No. L __ $

2 ___

0""'

3 ___

4 ___

5 ___

6 ___

29,136.61$ 18,943.91 20, E2E. 69 s,6e3.62 22, 383.47 18,817.37

I, 616 84 $ 622.39 985.15 39193
I. 550 22 1,688.75

15.28 $

6 .GO$

11.72

13.CC

27.87

2.49

17.25 -----

28 70

10.15

25.53 -------------

3G .OG $10,625.53 $ 23.80 8,177.82 39.50 8, 289.92 13.49 4, 293.66 37.68 8,202.51
7,401.32

1,195.47 ---------- ------------ $ 1,245.20$

445.64 ---------- -----------

329 .8C

1,074 93 ---------- ------------ --------------

466.12 --- ------ ------------

996.82 ---------- ------------ --------------

I, 030.35 ---------- $

6r .65 --------------

2.91 $ 1.15
.85 .61 .48 1C .29

43,873.84 28,569.23 30,946.40 14.846.68 33,21003 29, 024 26

1-------------------------------------------------- -------- -------------

TOTALS. _____ $ 119,470.67$ 6,855.28$ 126.35$

3164$ 144.47$46,990.76$ 5,209.33----------$

60 65 $

180,480.44

SURVEY PLANS BY DIVISION UNITS

Division No. L._ ______________ ____________

____ __________ ________

-- ------------ ----- -------- $ 9, 672.78 $ 9, 672.78

2___ -------------- ------------

---- ---------- ---------- ----------

- ------------ ----

13,105.22

13,105.22

3___ -------------- ------------ ---------- ----

---------- ------------ - -------- ------------

12,517.82

12,517.82

4___ -------------- ------------ ---------- ------------ -------- - ---------- ------------

------------ -------------- 16, 728 .07

16, 728.C7

5.. -------------- ----------- ---------- ----------- ---------- ---------- ---------------------------------- -------------- 13, 12f .61

13,129.61

6. __ ------------- ---------------------------------------------------------------------------------------- ------------- 9, 786.59

9, 786.59

-------------------- ------ ---------- ------ ----1----1------- --------------

TOTALS _______ -------------- ------------ __________ ------------ ___ _

-------- ---------- ------------ --------------$ 74,936.09$ 74,936.09

Schedule No. 10-D STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1931 TO JUNE 30, 1932

Personal Services

Equipment Expenses

Furnishing Communi- Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

Jnsura nee

Printing, Binding, Publicity,
Etc

Payments to Contractors

Special and MiscelJaneous Expenses

MAINTENANCE SUPERVISION BY CONGRESSIONAL DISTRICTS

Total

-...1... District No. L_ $ 2 -

5, 071.42 $ 4, 619.18

699.97 $ 598.34 $ 432.29 475.13

18.60 $ 242.54 $ 997.72 $ 230 22 1, 658.77

288.63 $ 116.31$ 260.54 100.00

9.82 ----- ------- ---------- - $ !.55 -------------- ------------

8,043.35 7, 777.69

3-.

4, 319.70

422.69 453 .57

5.12 178.15 ], 413.68

154.09

87 .C2

1.36 - ------------ ------------

7,035.38

4..

4,472.98

443.01 506.08

20 20 142.13 1,111.79

165.12

90.28

1.68 ------------ ------------

6,953.27

5-

963.45

67.38

69.69

5.01

46.67 227.44

40.69

16.93

.49 -------------- ------------

], 437.75

6 ..

4,627.03

480.91 551.71

18.98 138.06 1,181 .39

142.71

91.08

1 38 -------------- ------------

7, 233.25

7.

6,427.58

321.70 470 54

47.47 291.95 1,276.12

259.00 124.11

9.65 -------------- ------------

9,228.12

8 ..

5, 053.40

588 82 388.73

9 19 259.61 ], 500.59

300.07

91.04

10.00 ------------ -------------

8, 201.45

6,587.73

598.06 485.05

20.81 332.53 ], 778 83

303.58 117.40

1. 75 -------------- ------------

10.225 74

4, 271.25

755.53 446.57

26.55 202.11 ], 065.14

373.26

89.45 ------------ ------- ----- ------------

7, 229.86

7,719.10

735.21 904.08

5.32 375.41 ], 593.83

420.40 188.01

3.34 -------------- ------------

11.944.70

5, 794.40

818.73 564.fi2

25.47 2.54.02 1, 343.48

342.39 126.86

.49 ------ ------- ------------

9,370.36

----- ------- ---- ----------1-----1---- --------------------

TOTALS ______ _

59,927.22$ 6,364.30$6,014.01$

202.72$2,693.40$15,148.78$ 3,050.48$1.238.49$

41.52 ------------

-------- $ 94,680.92

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10-D-Cont'd.

ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1931 TO JUNE 30, 1932

Personal Services

Equipment Expenses

Furnishing Communi- Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

lnsura nee

Printing, Binding, Publicity,
Etc.

MAINTENANCE DIRECT BY CONGRESSIONAL DISTRICTS

Payments to Contractors

Special and Miscellaneous Expenses

Total

District No. 1.. $ 97,113.56$ 79,829.93$ 166.05 $

60.36$ 388.28 $ 883 31 $ 19,169.92 $ 1,424.35- -----~

611.41 $

93 91 $ 199,741.0

2 ..

97' 905.52 68,484.01

41.61

56.21 339.97 1,450.95 16,120.79 l, 700.72 --- ------

167 69

37.71 186, R05 .l

3 ..

82,295.73 58,379.78

26.62

53.31 29746 1,314.60 9, 938.26 l, 386.29 --- -----

147.10

15 53 153,854.6

4..

74,710.34 46,456.32

12.76

59.94 l, 663.19 1,208.90 17,429.80 1,149.72. ----------

237.78

91.28 143,020.0

5 ..

12,801.78 8, 288.89

17.97

19.04 152.19 210.84 3, 073.93 219.01 --- -- ----

29.00

24.84

24,837.4

6 ..

81,831.20 48,475.04

5.30

58.96 29045 l, 287.66 12,940.76 l, 221.61 --

---

119.29

9 84 146,240 .l

7-.

77,461.78 57,708.90

96.58

8 ..

75,035.26 61,652.33 126.69

127.41 49~ .55 1,395.72 112 56 7,046.22 l, 071.67

17,809.68 l, 303.55 -- ---- ---lR, 210.61 l, 361.77 -- ---------

132.79 153.10

73.55 73.86

156,634.5
164,844 .o7

9 .. 105,897.30 62,277.44 209.21

134.11 4, 424.57 1,420.66 28,479.51 1, 676.85 --

-- --

178.61

69.21 201,76747

10--

76,258.28 63,173.33 118.27

72 34

670.26 l, 035.53 17,728.05 1,267.46- ----------

124.10

40.62 160 488.24

11.. 142,639.36 97,216.50 225.96

66.84 378.46 1,514.23 27' 971.98 2,267.17 ---- --- ---

3, 395 53

54.08 275,730 .l l

- - - - 12-- 100,009.21 67.529.69 13048

77.56 514.41 1,443.11 34,882.21 l, 746.87--

-----

166.51

21.28 206,521.3

----

--- ---- ---- ---- ----- ---- ------ ------ ----- -----

TOTALS ----- $ l, 023,959.32 $ 719,472.16 $1,177.50$ 898.64 $16,660.01 $14,237.18 $223,755.50 $16,725.37 -- - .... $ 5, 492.91 $ 605.71 $ 2,022,984.3

Schedule No. 10-D-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1931 TO JUNE 30, 1932

..

- - - - - - - - - - - --

Personal Services

Equipment Expenses

Furnishing Communi- Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

lnsur .. a nee

MAINTENANCE SUPERVISION BY DIVISION UNITS

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total

Division No. L .. $

2...

-'! C'-'

L

10,190.00 $ 9, 952.50
10,544.00

507.86$ 746.69 $ l, 087.66 731.67 l, Hl.41 l, 286.26

75.57 $
13 .oo
40.38

465.00 $ 2.024.48$ 518.40 2,997.74 300 .00 2, 741.66

446.98 $ 495.51 284.45

195.86 $ 173.01 209.36

12.94 -------------- -------- ... $

lO .00 ----

------------

2.65 ----- -------- ------------

14.6G5.38 15, 979.49 16, 55C .17

4...

9, 598.22 l, 760.35 l, 035.85

64.61 450.00 2, 348.52

843.60 202.10 ------------ -------------- ...

16,303.25

5...

9, 860.00

9~2.17

995.00 ------------

480.00 3,539.51

483.48 208.91

3.42 -------------- ------------

[:;, 492.49

6..

9,782.50

944 85 l, 218.54

9.16 480.00 l, 496.87

496.46 249.25

12 51 -------------- ------------

14,690.14

~--~- - - - - - -~~ ~---- - - - - - ~~- ~~~ ~-- -~- - - - - 1 - - - - 1 - - - - - -

TOTALS...... .

59,927.22$ 6,364.30$6,014 01$ 202.72$2,693.40$15,148.78$ 3,050.48$1.23849$

41.52 $ 94,680.92

MAINTENANCE DIRECT BY DIVISION UNITS

Division No. L .. $ 124,174.46 $ 88,236 14 $ 218.51 $ 202 17 $ 969.20 $2,214.98$ 30,237.25 $ 2, 084.45 ---- $

369.76$ 153.39 $ 248,860.3

2... 159,673.23 113,301.79 252.05

213.69 11,370.27 2,151.92 40,624.57 2, 695.97 -----------

302 55

96.51 330,682.5

L. 182,931.24 115,253.37

.55

128.72 l, 953.99 2, 989.04 36,293.79 2,818.97 ------------

287 79

76.93 342. 734.3

L . 173,495.31 133, 191.14 256.80

161.62 l, 318 05 2, 373.53 42,892.26 2, 911.50 ------- ----

279 .85

81 50 356,961.56

5... 211,745.19 138,617.34

89.20

119 24 719.75 3,151.82 39,854.79 3, 530.32 ------------

3, 521.10

66.76 401,415.51

6... 171,939.89 180,872.38 ------

360.39

73 20 328 75 l, 355 89 33,852.84 2,684.16 ------------

731.86

130 62 342,329.98

- - - - - - - - ~-- - - - - - - - - - - - - - - - - - - - -~~- - - - -

TOTALS....... $ l, 023,959.32 $ 719,472.16 $1,177.50$

898.64 $16,660 .Ol $14,237.18 $ 223,755.50 $16,725.37 $

5, 492.91 $

605.71 $ 2, 022,984.3

Schedule No. 10-E STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL
DISTRICTS AND DIVISION UNITS
JULY 1, 1931 TO JUNE 30, 1932.

Payments to Contractors
RECONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS NONE

Total

RECONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS

District No. L 2. 3_
4 5. 6. 7. 8 9 - --10.. 11. 12.

--------

12,662.55 $ 12.662.55

TOTALS.

. ..$ 12,662.55 $ 12,662.55

RECONSTRUCTION SUPERVISION BY DIVISION UNITS NONE

RECONSTRUCTION DIRECT BY DIVISION UNITS

Division No. L. -----------2.. 3. ---------------------4. 5-6. -
TOTALS __

. ...$ 11,877.90$ 11.877.90

784.65

784.65

____________ $ 12,662.55 $ 12.662.55

74

296-C, WUkes-McDuffie Bridge and Approaches

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 11

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPEND! TURE

General Administra-
tion

Research and
Analysis

Enforce. ofM. V.
Law

Quarry

Construction

Surveys

Maintenance and Recon-
struction

Shop

Buldings and
Equipment

Legislative
Transfers

Total

---------- ------------------- -----1----+---1-----J----J-----

PERSONAL SERVICES

G. 0. Administration

Administrative_ Others ______ ... __ .

--- $ 84,067.99 ----------233,800.65 ------

$ 84,067.99 233,800.65

Field Office Adm:nistration

Administrative. ______ _

23,335.00 -

Others. _________________ __ 28,993 03 -----------

23,335.00 28,993.03

Research and Analysis

Administrative __________ - ---------- $ 3,525.00 ------

Others_____ ___________ _

19,387.48---------

3, 525.00 19,387.48

Crack Survey__

175.74-----------

175.74

G. 0. Shop

Administrative Others _____ __
Direct Shop ____________ --

$ 2,950.00--

-----------

8,636.44----------- -----------

70,912.77----------- -----------

2. 950.00 8, 636.44 70,912.77

Supervision

Direct Supervision ____ _ Others .. _______ _

------ $ 594,895.74 ------ ---- $ 43,875.08 4, 729 04 ----------- 16,052.14----------- ----------- -----------

638,770.82 20,781.18

Direct Costs

Survey Parties_

---------- $119,470.67

119,470.67

Maintenance Patrolmen

233,888.89----------- ----

233,888.89

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 11-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE General Research Enforce.

Maintenance

Administra-

and

ofM. V. Quarry Construction Surveys and Recon- Shop

tion

Analysis

Law

struction

Land, Buildings
and Equipmert

Leg islative
Transfers

Total

Direct Costs-Cont'd.
::J Constr. andReconstr.

Foremen________________ ------------ ----------- ----------- ----------

78,766.40 ----------- --

Equipment Operators.. __ ------------

-- ---- . . __ _

Shop Employee's Field.-

______ ___________ ___________ __________

81,541.91 ----------ll,335.07 _________ _

Sign Employees __________ ------------ ----------- ______________________________________ _

216.235.86----------- ----------- ------ ----

42,541.13 ----------- ----------- -----------

30,149.13-

----------- -----------

Other Skilled Labor _____ ------------ __________ ----------- __________

Common Labor. _________ -----

______ ___________ __________

56,548.19 _

17,829.62------- ----------- ------

87,099.03 __________ _ 483,314.69

-- ----------

Quarry

Administrative ___________ .

Others _________________________ _

78,766.40 297,777.77 53,876.20 30,149.13 74,377.81 570,413.72

Direct Quarry____________ ---------------------

----- $ 886.30-------------- ----

886.30

Enforce. of M. V. Law____

________ -----------$25,518.70---------- -------------------

25,518.70

Professional Fees_

6,460.00 ___________ ----------- ______ --- -------------- ___ _

6,460.00

1----1----- - - - ---------1----- -------- ---- ---- -----

TOTALS _________________ $ 376,656.67$23,088.22$ 25,518.70$ 886.30 $ 914,915.38 $ll9,470.67 $1,083,886.54$ 82,499.21 __________ _

$ 2, 626, 921.69

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 11-Cont'd.

ADM I Nl STRATI ON

CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPENDITURE

General Research Enforce.

Maintenance

Buildings Legisl1-

Administra- and

ofM. V. Quarry Construction Surveys and Recon-

Shop

and

tive

tion

Analysis

Law

struction

Equipment Transfers

- - - - - - - - - - - - - - - ----------~--~~- -~~- ~--- --~--

~~---- ~---- ~--~-

~----

Total

EQUIPMENT EXPENSES

Automobile M.\intenance

Tires and Tubes

-- $ 2,654.74$

Accessories, Parts and
..., Repairs. __________
00 Greasing, Washing,

8, 738.49

Storage, etc.

2,566.25

Road Equipment Expense

193.03 $ 312.09 35.75

264.23 -- ------- $ 896.99 --334.62

7,677.04$ 1,081.73$

22.052.45 4.618.05

6. 228 .44

888 86

3, 374.94 $ 4. 706 00
886.11

53.38 222.99 21.25 -----

15, 299 .09 41.547.06 10,961.28

Gas and Oil ___ Tires and Tubes_ Accessories. Parts and

204.10 58.60

415.00 ----------65.41 ------

36 33

113,854.15 ----11,743.23 ---

396,720.47

254.38

21.484 51-----

511.484 .43 33,351.75

Repairs ___________ _
Miscellaneous Charges.. Repairs to Office EQuipt. __ Repairs to Engineering

50.85 1.123.50----2 00 -739 04 --------

76.907.86 1. 276 35
57.20

291.260 97 1.137.61 --

3.40228

43.69 __

1.25

41.60 ----

370,480.79 4,724 32 839 .09

EQuipt __________________ _ Repairs to Machinery

26.82

1. 467.22

265 39

1.11

1. 760 54

EQuipt. _________________ _ Repairs and Upkeep Land

5.75

76.03

13.75 ---

45.18

94.02 ----

234.73

and Buildings __________ _ 1.145 02

31.72 -----------

6.94

138.23-

3, 026.31 1.192.Ql ___ _

Transportation of EQuipt

6,716.58 --------

886 98 2. 541.71 -----------

- - - - - ~--- - - - - - ~~~- - - - - - - -~-- -~----- - - - - ~-

- - - - --~

5, 540 23 10.145 27

TOTALS _____ _

- $ 16,191.66 $ 2. 252.53 $ 1. 495.84 $ 43.27 $ 248,132.50$ 6,855.28$ 725,836.46$ 5,561 04_ ____ _

$ 1.008,368.58

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 11-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE

General Admmostra-
lion

Research and
Analysis

Enforce. ofM. V.
Law

Quarry

Con8'truction

Surveys

Maintenance and Recon-
struction

Shop

Land, Buildings
and Equipment

Leg islative
Transfers

Total

EQUIPMENT PURCHASES Automobiles. ________________________________________________________________________________________________ ----------- $ 31.424.55 __________ _

Trucks________ _____________

__ _________________________________________________ ----------- ------------- ___________ 262,096.52 __________ _

Tractors .. ____

_____ _________ _ ___________ __________ ______________ ___________ _____________ ___________ 73,034.34 __________ _

31,424.55 262, 096.52 73, 034.34

Road Machinery, Misc.____

___________ __

-------------- ___________ ------------- _________ __

Office Equipment.

_____________________ , ___________________________________________________________ __

Engineering Equipment ... ______________________________________________________________________________________ , ___ __

Shop Equipment __________ ------------ ----------- _____________________ -------------- ----------- _____________ ----------Laboratory Equipment____ ---------- ________________________ --------- _____________________________________ -----------

127' 430.53 7.531.65 ----------6,745.00 ----------10,252.84 -----------
OR673.80 _________ _

127,430.53 7. 531.65 6,745.00 10, 252.84
OR673.80

Buildings__________________ -------------------------------------------- ---------- ----------------------------------- 3.672.93 ----- -----

3, 672.93

Land .. _________

--------- ----------- ----------- - -------- -------------- ---- ------- ------------- ---------

435.75-----------

435.75

- - - - - - - - - -------~--1-----1----~ - - - - - - - - - - - - - - - - - - - - - -

TOTALS __________________ ------------ _______________________________ ------------------------- ------------- ----------- $521,950.31 __________ $ 521.950.31

COMMUIIIICATION SERVICES Telephone and Telegraph $ 12,637.33$ 33.44 $ Postage____________________ 6,564.30 __________ _
TOTALS __________________ $ 19,201.63 $ 33.44 $

46.04 ---------- $ 5.15----------
51.19 ---------- $

3,5ll.l6 $ !, 082 .46
4,593.62$

59.74$ 66.61
126.35$

5,202.75$ 1,988.76
7,191.51$

609.64----------- ----------46.25- --------- -----------
655.89----------- ----------- $

22.100.10 9, 753.53
31,853.63

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 11-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE

General Administra-
tion

Research and
Analysis

Enforce. of M. V.
Law

Quarry

Construction

Surveys

Maintenance and Recon-
struction

Shop

Land, Buildings
and Equipment

Legislalive
Transfers

Total

HEAT, LIGHTS, POWER.

WATER, AND CLEANING SER-

VICES

Furnishing of Heat ________ $ 608 92

50.23 ---------- -- ------- $

25.00$

6.50$

30 20 $ 98.36 ----------- ----------- $

819.21

Furnishing of Lights_____ _ 1, 496.83 1,235.68 ----------- ----------

970.75

5 99

517.92 1,976.97---------- -----------

6,204.14

Furnishing oiPower_ _____ _

7.08 -----------

60.63 154.40 ----------- -----------

222 ll

FurniShing of Cleaning __ _ 2,123.00 ----------- - -------- ----

33.88 --------- - ----------- -----------

2, 156.88

Furnishing of Water ______ _

788.36

16.00 ----------- ----------

720.74

19.15

458 '73

315.45 ----------- ----------

2, 318.43

- - - - - - - - - ~-- ~--- --~~ -~-

--~- ---~-

-----1~---1------

TOTALS. ________________ _ 5,017.11$ 1,301.9! ___________ ----------$ 1,723 57$ 31.64$ 1,101.36$ 2,545.18----------- ----------

ll, 720.77

-~--- - - - - - - - - - ---------~-1----1----~- ---~- --~- - - - - - 1 - - - - -

RENTS

Rents, Road Machinery_______________________________________________ $ 6,120.68-----------$ 11,312.01 ________________________________ $ 17,432.69

Rents,Bldgs.andGrounds $ 2,813.40----------- ----------- __________

2,386.90$ 144.47

8,016.40$

1.00 ______

__ _______ __

Rents, Office Equipt..

3,331.97 ___________ ----------- _____________________________________________________________________________ __

Rents, Engineering Equip. __ ______ ___________ ___________ __________

8.00 ________

__ ___________________ _

13,362.17 3, 331.97
8 00

Rents, Miscellaneous. ____ _

56.15----------- -----------

47 00----------

25 00-----------

128.15

1 - - - - 1 - - - - - - - - --~ -~~- - - - - --~- - - - - - - - 1 - - - - - - - - - -

TOTALS _________________ - 6,201.52 ----------- ----------- ---------- $ 8, 562.58 $ 144.47 $ 19,353.41 $

1.00 ----------- -----------

34,262.98

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 11~Cont'd.

ADMINISTRATION

OBJECT OF EXPENDITURE

General Admimstra-
tion

Research and
Analysis

Enforce. ofM. V.
Law

CONSTRUCTION

MAINTENANCE

Quarry

Construction

Surveys

Mairtenance and Recon-
struction

Shop

Land, Buildings
and Equipment

Leg islative
Transfers

Total

00 INSURANCE ,_. Fire Ins. B1dgs. and Fix-
tures _____________________ $
Liability, Fire, etc.. Equip. Bond Premiums__________ _

142.96 9,557.99$ 5,275.98

-------- $ 703.15 -------------- -----------

224.43 -- ------ ---------- $ 4,087 33 -----------

17 50$ 133 00 ----------

554 34 ----------

236.48 -----------

-----------

16,487.08$ 343.67------ - -- --------

1,2-10.30 101.50----------- -----------

1,082.59 30,700.50 7,322.62

TOTALS __________________ $ 14,976.93$ 241.93$ 133.00$ 703 15$ 4,641.67 ----------- $ 17,963.86$ 445.17 --------- - ----------- $ 39,105.71

- - - - - - - 1----1--~--

---~ ~-~- ~~~- -~-~~ -~--~

-~-~- -~-~

TRAVELING EXPENSES

Subsistence_ Transportltion

11,870.40$ 1.008.45$ 4,726.07 .......... $ 11,016.78 $ 36, 256.22 $ 17,209.38$ 279.45 ----------- -----------

Gas and OiL ........... - 13,875.44 Mileage Allow. or Auto

953.95 2, 094.50 ----------

54,772.30 10,601.81 12,025.51

415.99 ----------- -----------

Hire_.

l, 764.94-

5, 461.80 --------

27.00

1.00

2.00 --

---------- -----------

Other Transportation_.

3, 467.49

448.22

987.85 ----------

956.23 131.73

149.07

63 02 ----------- -----------

- - - - - - - 1----!j--~--

-~~ -~-- ---~~ ~~-~~ ~--~ -~-~-

TOTALS________________ 30,978.27$ 2,410.62$ 13,270.22----------$ 66,772.31$46,990.76$ 29,385.96$ 758.46 ______________________ $

82,366.75
94,739.50
7,256.74 6, 203.61 190,566.60

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 11-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE

General Administra-
tion

Research and
Analysis

Enforce. ofM. V.
Law

Quarry

Construction

Surveys

Maintenance and Recon-
struction

Shop

Land. Buildings
and Equipment

Legislalive
Transfers

Total

----------------1------ ------ ------------------------1----1-------

SUPPLES AND MATERIALS

Office Supplies... _________ $ 11,587.11$ 436.37 $ 34 64 ----------

Drafting and Engineering

Supplies. ________________ _ 8,082.90---

'"'00 Photographic Supplies._ .. Cleaning and Toilet Sup-

869 07 --

Supplies. _______________ --

441.39

6.25 -

Laboratory Supplies

3,572.50----------- --

Camp Supplies

I, 318.60 $ 47.16 $ 2, 447.67 $ 600.84-

22,157.02 5,138.37

451.70 ----------- ----------- ----

27.73 ----------

37.71

12 82 ----------- -----------

16,472.39
35,829.99 869.01
498.17 3,600.23

Forage and Supplies-

Animals. _________ ------ ------------ -

18,377.00------------------------

18,377.00

Provisions.--------------- ------------ ----------Wearing AppareL ... _______________ _

42,964.76 --------15,656.11 -------

42,964.76 15,656.11

Medical Supplies ____________________ ----------Other _____________ _

1,946.80 22,025.52 ------

437.50 ----------- ----------- -----------

I, 946.80 22,463.02

Tools

FueL. _____________________ _

34.00

Explosives _____________________________ ----------- ______ _

Signs_____________________________________________ _

Materials _____________________________ _

General Supplies. _____________________ ----------- ___________ $

14.42

6,539.58----------

4,981.11

.85

18,753.21 ----------

187.65

10.00

639,284.22 -----

8,036 99

12.95

7,069.04

762 76 ----------- -----------

380.63 1,368.33----------- -----------

2,437.19

58,794.67

143,456.41 165,440.15 ----------- -----------

11,293.46 2,363.12-

--- -----------

14,371.38 6,764.92 21, 190.40 58,992.32 938,180.78 21,720.94

-----------------------1-----1----------- -----

TOTALS ________________ $ 21,014.47$ 4,015.12$ 34.64$ 14.42$ 802,256.30$ 5,209.33$ 226,805.98$160,548.02 .. _. ______ ----------- $1,219,898.28

Schedule No. 11-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS

JULY l, 1931 TO JUNE 30, 1932
_ _ ==-=====~=====-7-======-=-~~- .-=~==~~======~==========-==-~=-----_-_- -_-_-_-.--------~=

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPENDITURE General Research Enforce.

Maintenance

Buildings Legisla-

Administra- and

of M. V. Quarry Construction Surveys and Recon- Shop

and

live

Total

tion

Analysis

Law

struction

Equipment Transfers

-------~----- - - - - - - - - - - -~~- - - - - - - - - - - - - - - - - - - - - - - - - - - ---~- - - - - - - - - -

PRINTING, BINDING, PUB-

LICITY, ETC. Printing Annual Report ___ $ 1,037.22----------- ----------- ---------- -------------- ----------- ------------- ----------- ----------- ----------- $
Printing Maps_ ----------- 1,075.97 ----------- ----------- ------- -- -------------- ----------- ------------- ----------- ---------- -----------

1, 037.22 1.075.97

Publication-Georgia Highways ______________ _ 2,902.13 ----------- ---------

2, 902.13

Stenography, Typewriting

and Multigraphing. Job Work _____________________ _

95.45 ----------- ----------- ---------- $

25.00 $ 58.10 ------------- ----------- ----------- -----------

178.55

Photo Printing and De-

veloving Job Work ___ --_

108.27$

7.16- --------- ----------

95.75

2.55$

41.52 ----------- ----------- ----------

255.25

- - - ------ ----- ------ --------1------1-------- ------ ----------- -----

TOTALS ________________ $ 5,219.04$

7.16 ----------- ---------- $

120.75$ 60.65 $

41.52 ----------- ----------- ----------- $ 5, 449.12

---------------------------1-------1------ -----------1-------1 -----

CLAIMS Compensation. Employees$ 17,861.44 ___________ ----------- ________________________ -----------

...... ----------- ----------- -----------

17,861.44

Damage, Others____________ 7,518.20 _____ ----- ----------- ---------- ______________ ----------- ------------- ----------- ----------- .......... .

7,518.20

---- -------1-------1---- 1--------------- ------------ ------ -----1 --------

TOTALS----------------$ 25,379.64----------- ................. -------------- ------- ----------- .......... ----------- ........... $ 25,379.64

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 11-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPENDITURE

General Adminiftra-
tion

Research and
Analysis

Enforce. of M. V.
Law

Quarry

Construction

Surveys

Maintenance and Recon-
struction

Shop

Bwldings and
Equipment

- - - - - - - - - - - - - - - 1 . - - - - 1 - - - - - - - - - - -~~ ~--- -~~- --~--- ---~- - - - - --

PAYMENTS TO CONTRACTORS Payments. ______________ _

-- ---------- $14,565,868.69$ 1,575.00$ 18, 155.46

Penalty or Bonus (Net Bonus) ______________ _

24.351.41 -

Leg islative
Transfers

Total
$J.1,585,599.15 24, 351.41

TOTALS __________ _

_ $14,590,22G.l0 $ 1.575.00$ 18, 155 .46 ------

$14,609,950.56

SPECIAL AND MISC. EXPENSES

Advertising_

_______ $ 4,161.65 ______ ___________ ___ __ $

3 00

---------- ----

Blue Prints___

407.40$

1.40 _________

46.27$74.938.09

Tests_________

7.74

60.60 __________

34,349.78

9 39$

466.79$ 1.274.00

Traffic Census

5,897.43 _

_____ ________

Subscriptions and Dues..

3,725.94

3 00 _______

___ -----.

2 00--

Incidentals..... ___________

584.76

94.90$ 33.95 _

1.476.11

4 90

138 92

11.63 __

Interest_____________________ 1. 014.08

____________ . ____________

__ __ ----------

Burial Expense_____________

!.50___________ ___

185.24.

Rewards ....... ____________

1.660.00.

Transfers-Convict Farm .. ____________ ..

_______ ----

Transfer:'--W. &A. Rental ____________ __

_ --------- __________ ...

.. $124.186.93 540,000.00

4,164.65 75,393.16 36,168.30 5,897.43 3,730.94 2.345 17 1. 014 08
186.74 1.660 00 124.186.93 540.000 00

TOTALS ___________ $~; $"(i~;;;;-; $----;~9; ----~ ;--;7, 720 40~;~~;;-3~~;----6~5 ; $-1.287 63 -~ -~_-_ ;~4. 186-~ ;--~~~~;

TOTALS ____________ $ 530,740 01$ 39,408 26$ 40,537 54$~~ ~~9~6~9~ ;2~~;,-;; ;~~;,;;-;; $;;.;~:;;,~ ;;;;-~;3~ ;;..;~-;,-~ $~~~~~

STATE HIGHWAY BOARD OF GEORGI.\ ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 11--Cont'd.

ADMINISTRATION

OBJECT OF EXPENDITURE

General Admm1str.1-
tion

Research and
Analysis

E~Jfarce.
cf M. V. L>w

CONSTRUCTION

MAINTENANCE

Quarry

ConstructiOn

Surveys

Maintenance and P.econ-
struction

Shop

Land, Buildings
and Equipment

Leg1slative
Transfers

TOll I

LESS: INTEi'-CEPAFiTMENTAL

BILLINGS

Blue Prints

G. 0. Salaries..

--- $

G. 0. Supplies and Ma-

terials______

Shop

Total Disbursements

Research and Analysis

Total Test Disbursements

63,300.91 _ 12.257 92
32.031.54

-----$254,301.60 -

I

_

______________ _

63. 3oo .n
12.257 92 254.301.60 32, 031.54

TOTALS

. $-75,558 ;~ ;-;;;~;-;~ __ .

- - ~- -~ $~5U0160 ----==~

- - - - - - - - - - - - - - - -- --- -~

~-

-~- ------~---

------

-- ----

361.891.97

NET EXPENSE DIS-

I

BURSEMENTS.. _____ $455,181.18$ 7,376.72$40,537.54$ 1,647.14$16,679,659 181$255,116 53 2,130.327.77 . ______ $521,950.31$664,186.93 $20,756,233.30

1

1

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1931 TO JUNE 30, 1932

Schedule No. 11-Cont'd.

Administration
General Administration_____ _ Research and Analysis. ____ _
Enforcement of M. V. Law.. Quarry ___ _

SUMMARY

Construction
Construction Surveys _____ _

Maintenance General Maintenance__ _ Reconstruction.

Land, Buildings and Equipment.

Legislative Transfers

___________ . _.

TOTAL-EXHIBIT "C" _

___ $ 455,181.18 7,376.72 40,537.54 1,647.14 $ 504.742.58
--- __ $16, 679,659.18 255,410.53 16,935,075.71
_____ $ 2,117,665.22 12,662.55 2,130,327.77
521,950.31 664,186.93
--- __ $20, 756,283.30

Fannin County, Making 30 Feet Fill by State Forces
Talbot County, Old Covered Bridge Over Big Laze Creek Between Manchester andTalbotton, Wrecked by Equipment which Fell in Creek.
87

Schedu~e No. 12 STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS & DISBURSEMENTS BY TYPES
JULY 1, 1931 TO JUNE 30, 1932

July 1, 1931 I Jan. l, 1931 I

To

To

Total

I Dec. 31, 1931 June 30, 1932 For Year

ALLOTMENTS

Soil

$2,115,746.27$ 1,600,601.92$3,716,348.19

Gravel

470,496.99 CR121,929.17 348,567.82

Macadam__

________ _

74' 120 .40

74,925 .49 149,045 .89

Surface Treated

1,537,933.53 903,687.31 2,441,620.84

Bituminm:s Macadam ____ _

231,908 .01

45,793 .06 277,701 .07

Bitu minot: s Concrete

431 '445 .34 293, 607 .49 725,052 .83

Cement Concrete _________ _ 3,426,576.79 l, 241,603.85 4, 668,180.64

Brick __

22,319 .00

B3, 300 .00 105,619 .00

Structures __________ _

219,627.0

27,792.17 247,419.97

----------------------1----------

Totals

_____ ~~ ,~3;12''!_.13 iB_ '!_,_ l49_.Ri32 .12 $_1:2,~79 ,556_.25

DISBURSEMENTS

Soil

---- -- ---------- --- $ 2,253,050.32 $ 2,620,618.65 $ 4,873,668.91

GraveL ---- --- ----- -- ---

266,534.48

327,254.86

593,789.34

Macae am_

- - - - - - - - - - - -

83,404.01 125,466.91 208,870.92

Surface Treated ___ --- --- 2 , 135, l 73 . 71 1,314,389.49 3,449,563.20

Bituminous Macadam ____

326,331.85 213,763.48 540,095.33

Bituminous Concrete __

455,164.01 224,074.53 678,238.54

Cement Concrete ________

4,230,633.02 1,719,132.06 5,949,765.08

Brick __ - - - - - - - - - - - - - - - - - - - - - - - - - - -

6,267.07

6,267.0 7

Structures ______________ - -

225,658.43 152,742.30 378,400.73

Totals ____________ -- _ $c9,~7~,949.~ $ ~.7~Cl_.'i'()()_.351~l~679,65()_.l8

88

Schedule No. 13
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS, BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
BEGINNING OF HIGHWAY DEPARTMENT TO JUNE 30, 1932

I

!

'Distr. of Total

of Allotments

on Mileage

Basis

Funds Actually
Allotted

Excllss Allot. I Allot. Under

I

over Mileage Basis

Mileage Basis Dis-

I Dist.

tribution

CONSTRUCTION Beginning of Department to June 30, 1932

District No.1 $ 10,222,599.27 :B 9,807,676.36!__ __

I$ 414,922.91

2 10,029,851.92 10,295, 182.91 265,330.98

3_ 10' 422,891. 60 7, 379,389.07 -

3, 048,502.53

4_ 8,779,490.R8 9,286,025.85 506,534.97 1
5 2, 189, 101.87 2, 385,805. 62 196,703. 75

6_ 9,417,398.61 8,101,367.57- --

1,316,031.04

7- 9, 559,961.71 10,664,532.48 1, 104' 570.77,-

8 10,667,928.49 8' 052,823.35

2, 615, 105.14

9-' 12, 631, 500. 67 17, 330, 585.04 4' 699,084. 37

----

10. I 9,200,182.30 8,402,325.82

797,856.47

11 15,428,847.91 18,545,083.33 3, 116,235.42

12- 11, 898,266. 90 10, 197,224. 73 ---

1 , 701 , 042 . 17

- - - - - - - - - --------- - - - - -- ---

Totals - '$120.448, 022.14$120,448,022 .141_-----

-1--

CONSTRUCTION January 1, 1930to June 30, 1932

I

District No. L $ 3,175,312.09$ 3,705,510.94$ 530,198.85 2_ 3,304,313.85 3,233,243.60 -------------

-
71,070.25

3 2, 978, 166.42 2, 268, 112.79

710,053.63

4 2, 623, 183 . 96 1 '679, 922 .40

---

943,261.56

5-

fi47, 478. 10

947, 014 01 399 , 535 . 91 - - - - - - - -

6 2,813,6lfJ.89' l .611,509.80

1,202,106.09

2' 818,099. 79 2, 645,460.56 ------ -- 172,629 23

8_ 3, 372,4.19. 30 3, 252,956. 2R ___ ____ l2fJ, 463.02

3, 897' 775 .15 4, 252' 220. 73 454,445. 58 --

10 2, 797, 8'12 .16 3, 435,420.17 637 ..')38. Ol

lL 4,804,749.96 5,500,165.27 785,415.81 __ _

12 __ _2~1_1_~-=40._~ -- :~~2:3_-~~~ ~4_1_2._:=~ 121_:_:______ _:-_

Totals __ $ 36, 745,247. 65 $ 36,745, 247. 65 __ ___

_ ___ _ _ _ _

SUMMARY OF ALLOTMENTS January 1, 1930 to June 30, 1930_ July 1, 1930 to June 30, 193L ___ _ July 1, 1931 to June 30, 1932 ___ _

_____ $ 7,514,305.57 -- 16,551,385.83 12,679,556.25

Totals ____ _

_$36,745,247.65

89

Proj . ~-C , Stewart County, Route No. 1, Lumpkin-Cusseta Road, Cone. Paving, Sept., 1932

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 14.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

District

JULY 1, 1931 TO JUNE 30, 1932
------"'==----

I Distribution of Total of Allotments on Mileage Basis

Funds As Actually Allotted

July 1, 1931 Jan. 1, 1932

to

to

Dec. 31, 1931 June 30, 1932

Total for Year

July 1, 1931 Jan. 1, 1932

to

to

Dec. 31, 1931 June 30, 1932

Total for Year

Excess Allotment
over Mileage
Basis Distribution

Allotment under Mileage
Basis Dis-
tribution

CONSTRUCTION July 1, 1931 to June 30, 1932

No. L ________ $ 732,690.77$ 345,220.29 $ 1,077' 911.06$ 856,075.30$ 378,968.88 $ 1,235,044.18 $ 157,133.12 ----- -------

2_ --- ---

794,386.97

384,726.56 1,179,113.53

965,686.59

395,452.07 1,361,138.66 182,025.13 --- - -----

3 4

__- -_-_-_-_-_-_-_-

5 _________

6 -- ----

715,788.23 578,680.19
149,132.18 613,729.82

334,983.76 288,772.10
75,224.15 307,427.72

1,050, 771.99
867,452.29 224,356.33 921,157.54

804,233.35 503,063.67 206,299.57 648,846.65

308,529.39
55,850.66 189,483.46 174,788.25

1,112,762.74 61,990.75 ----- ------

558,914.33 ----- -- $ 308,537.96

395,783.03 171,426.70 - - -------

823,634.90 - ----- ------

97,522.64

7-- -- 8 ___ 9 ______ -

667,775.31 756,112.92 919,946.86

322,444.35 990,219.66 360,859.31 1,116,972.23 469,884.33 1,389,831.19

827,993.31 703,273.76 575,456.14

110,054.15 938,047.46 ----- -- 52,172.20

545,932.83 1,249,206.59 132,234.36 --- ------

512,760.12 1,088,216.26 . -----

301,614.93

111012_______-__-__-__--_--_--

638,789.76 1,110,611.62
852,529.50

308,938.10
550,793.13 400,108.32

947,727.86 1,193,818.33 1,661,404.75 779,687.92 1,252,637.82 465,739.54
----

277,679.66 1,471,497.99 523,770.13 -- ----------

674,900.93 1,454,588.85 -- - --- --- 206,815.90

524,981.72

990,721.26 -- -----

261,916.56

Totals - .. - $ 8,530,174.13 $ 4,149,382.12 $12,679,556.25 $ 8,530,174.13 $ 4,149,382.12 $12,679,556.25 -- ------- - ------------

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 14-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JULY 1, 1931 TO JUNE 30, 1932

District

Distribution of Total of Allotments on

Mileage Basis

I

Funds As Actually Allotted

July 1, 1931 Jan. 1, 1932 I Total

to

for Year

Dec. 31, 1931 June t3o0. 1932 I

July 1, 1931 Jan. 1, 1932

to

to

Dec. 31, 1931 June 30, 1932

Total for Year

Excess
Allotment over
Mileage Basis Dis-
tribution

Allotment under Mileage
Basis Distribution

- - - ------~-~-

MAINTENANCE July 1, 1931 to June 30, 1932

No. L _

$ 92' 158.60 $ 85,059.45$ 177,218.05$ 114,778.72$ 98,078.21$ 212,856.93$ 35,638.88

2

--

94,006.57

92,221.88 186,228.45

86,324.98

89,405.80 175,730.78

$ 10,497.67

3 -

85,655.61

83,097.20 168,752.81

72,098.61

85,124.57 157,223.18 --

11,529.63

4

75,505.79

67,180.07 142,685.86

78,484.49

62,089.38 140,573.87 --- .

2,111.9 9

5

13,209.35

17,313.04

30,522.39

15,504.12

14,140.88

29,645.00

877.3 9

6

81,127.91

71,249.05 152,376.96

71,052.52

83,354.90 154,407.42 2,030.46 . --- -

7

-

80,708.76

77,523.29 158,232.05

77,902.73

85,594.05 163,496.78 5,264.73 - - -

8

98,655.09

87,778.57 186,433.66

91,086.72

63,269.00 154,355.72 ---.

32,077.9 4

9

112,162.02 106,798.36 218,960.38 111,407.50

93,547.89 204,955.39 ---

14,004.99

10_

81,088.41

74,158.30 155,246.71

74,129.92

80,276.85 154,406.77 -

839.94

11

137,368.13 128,932.99 266,301.12 149,543.89 135,317.16 284,861.05 18,559.93 --- -- .

12

104,112.77

98,971.75 203,084.52 113,444.81 100,085.26 213,530.07 10,445.55

-----

----~-- --~----

---------

$2,' Totals - -- $ 1,055,759.01$ 990,283.95 046,042. 961$1.'055,759. Ol $ 990,283.95.$ 2,046,042.96 --

-------
------ --- -

I

I

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 14-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JULY 1, 1931 TO JUNE 30, 1932

--

-~

--~

------

--~-

~~-~-

~-~

District

Distribution of Total of Allotments on

Mileage Basis

I

Funds As Actually Allotted

July 1, 1931 Jan. 1, 1932

to

to

Dec. 31, 1931 June 30, 1932

Total for Year

July 1, 1931 Jan. 1, 1932

to

to

Dec. 31, 1931 June 30, 1932

Total for Year

Excess
Allotment over
Mileage Basis Dis-
tribution

Allotment
under Mileage
Basis Distribution

SURVEYS July 1, 1931 to June 30, 1932

L -- -$ 2

12,470.86$ 12,720.92

10,798.36$ 11,707.64

3

11,590.87

10,549.25

4

-

10,217.40

8,528.56

5_

1, 787.48

2,197.90

6

10,978.19

9,045.12

7_

10,921.47

9,841.64

8

13,349.96

11,143.56

9

--

15,177.71

13,558.13

10_

-

10,972.84

9,414.45

11

--

18,588.59

16,368.14

12

14,088.54

12,564.55

------ ------

Totals_ - _I$ 142,864.83$ 125,717.30$

23,269.22$ 24,428.56 22,140.12 18,745.96 3,985.38 20,023.31 20,763.11 24,493.52 28,735.84 20,387.29 34,956.73 26,653.09
268,582.13$

4,564.12$ 13,486.65 13,187.14 10,818.24 1 ,051. 97 11,882.92 18,776.14 16,467.86 10,666.41 8,753.61 26,515.36 6,694.41
~-
142,864.83$

10,843.73$ 6,669.67 10,047.59 7,357.97 6,677.05 9,044.07 17,866.32 12,977.93 11,082.36 3,256.37 18,298.51 11,595.73
125,717.30$

15,407.85 ------------$ 7,861.37

20,156.32 ----------

4,272.24

23,234.73 1,094.61 --

18,176.21 ---- . ------

569.75

7,729.02 3,743.64 --- -

20,926.99

903.68 ---

36,642.46 15,879.35 ----

29,445.79 4,952.27 -

21,748.77 -----

6,987.07

12,009.98 ----

8,377.31

44,813.87 9,857.14 --

18,290.14 ------

8,362.95

-

268,582.13 -----

--- - --- - -

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 14-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JULY 1, 1931 TO JUNE 30, 1932

District

I Distribution of Total of Allotments on Mileage Basis

Funds As Actually Allotted

July 1, 1931 Jan. 1, 1932

to

to

Dec. 31, 1931 June 30, 1932

Total for Year

July 1, 1931 Jan. 1, 1932

to

to

Dec. 31, 1931 June 30, 1932

Total for Year

Excess Allotment
over Mileage Basis Dis-
tribution

Allotment under Mileage
Basis Dis-
tribution

RECONSTRUCTION July 1, 1931 to June 30, 1932

No. L ________ $ 2 ________ _ 3 ________ _ 4 ________ _ 5 ________ _ 6 ________ _ 7 ________ _ 8 ________ _ 9 ________ _ 10 ____ _ 1L _______ _
12 _____ - -
Totals ____ $

6l.470R ______________ $ 62.700R ______ _ 57 .130R _____________ _ 50. 360R ___ _________ _ 8.810R ____________ _ 54.110R _____ _ 53.830R ______ _ 65. 8lOR _____________ _ 74. 820R ___________ _ 54.090R ___________ _ 9l.690R _______ _ 69 .450R __________ _
704.270R ______________ $

6l.470R$ 39.100R _______ _

_$

39.100R$

22 0 37 ------ -----

62. 700R _ ______ _

62.70------------

57 .130R

_ ________ _ ___ ___________ _

57.13 ------------

50. 360R ______________ ______________ ____________ _

8.810R ______________ _______

_____________ _

54.110R ______________ ______ _

___________ _

50.36-----------8 0 81 ------------
54.11 ----

53.830R _____________________________________ _

53.83--- ------ -

65.8lOR

259.510R ___ _ __ _____

259.5lOR

193.70

74.820R _____________________ _

74.82------------

54.090R

405.660R __

405.660R _______

351.57

91. 690R _______ _

- ---------- ---

91.69-------

69.450R __ _

----------

69.45------------

704.270R $ 704.270R __________ . __ _

704.270R ______________________ _

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 14-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JULY 1, 1931 TO JUNE 30, 1932
~=====~~-~~.~==========~~-===~--~========~~-~==========~~-~~==~~-=----_-.

District

Distribution of Total of Allotments on I Mileage Basis

Funds As Actually Allotted

July 1, 1931 Jan. 1, 1932

to

to

Dec. 31, 1931 June 30, 1932

Total for Year

July 1, 1931 Jan. 1, 1932

to

to

Dec. 31, 1931 June 30, 1932

Total for Year

Excess Allotment
over Mileage Basis Dis-
tribution

Allotment
under Mileage Basis Dis-
tribution

TOTAL ALLOTMENTS July 1, 1931 to June 30, 1932

No. L ________ $ 849,178.14$

2 _______ 3 _________

866,205.90 789,257.55

4_ -- - - . - 695,733.90

56___-_-_--

-
--

-
. -

7___ ----

121 '715.08 747,537.94
743,675.79

8.-- - --9 __ -- -- -10 __ -- -1L __ --- 12_ - - - - - - -

909,038.89 1,033,495.94
747,174.01
1,265,752.97 959,327.59

452,264.83 $ 1,301 ,442. 97$ 975' 379.04 $ 490,347.78 1,356,553.68 1,065,498.22 441,831.48 1,231,089.03 889,519.10
357,199.40 1,052,933.30 592,366.40 92,054.17 213,769.25 222,855.66
378,834.33 1,126,372.27 731,782.09
412,194.75 1,155,870.54 924,672.18
466,722.53 1 ,375, 761.42 810,568.83 567,851.59 1,601,347.53 697,530.05
394,302.97 1,141,476.98 1,276,296.20 685,542.38 1,951,295.35 955,747.17
526,237.16 1,485,564.75 585,878.76

487,890.82 $ 1,463,269.86 $ 161,826.89 ------------
491,527.54 1,557,025.76 200,472.08 -------- --403,701.55 1,293,220.65 62,131.62 - ---- ----125,298.01 717,664.41 ------------ 335,268.89 210,301.39 433,157.05 219,387.80 -----------267,187.22 998,969.31 ------------ 127,402.96 213,514.52 1,138,186.70 ------------ 17,683.84 622,179.76 1,432,748.59 56,987.17 -----------617,390.37 1,314,920.42 ------------ 286,427.11 361,212.88 1,637,509.08 496,032.10 ---- -----828,516.60 1,784,263.77 ------------- 167,031.58 636,662.71 1,222,541.47 -------- ---- 263,023.28

Totals ____ $ 9,728,093.70 $ 5,265,383.37 $14,993,477.07 $ 9,728,093.70 $ 5,265,383.37 $14,993,477.07 ------------ ------------

Schedule No. 14-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

Other Allotments, Undistributed Undistributed Maintenance _____ _ Administration ______ _ Research and Analysis _______ _
Enforcement of M. V. Law __ _ Quarry __ Equipment __ _ Shop ____ _
W. & A. Rental Discount ______ _

JULY 1, 1931 TO JUNE 30, 1932
$ 4,598.43CR 451,400.20 7,067.45 40,592.85 1,643.69 285,557.27 159.05 540,000.00

Total Allotments-Exhibit "B"

___ $16,315,299.15

Route 24. Jefferson County, Bridge Over Ogeechee River Near Louisville

STATE HIGHWAY BOARD OF GEORGIA FREIGHT ACCOUNTANT
This activity of the Board is connected with the Accounting Department and is in charge of an experienced traffic and rate clerk who audits all freight accounts. His services are also available to the Purchasing Agent and Engineering Department who frequently need advance information as to the effective rates applicable to contemplated movements of material and supplies.
During the year reported there were audited in excess of 25,000 freight bills and prepaid bills of lading, of which less than one per cent resulted in overcharge claims. A large portion of our bills are audited prior to delivery and in such cases any necessary corrections are made immediately which of course obviates the necessity of filing claims. When irregularities are discovered it is seldom that claims cannot be adjusted and settled by dealing directly with the transportation companies interested. This is due in a large measure to the co-opera.tion and friendly attitude of the transportation companies with wJ::om we have dealings.
The commodities transported in and out are for the use of the Highway Department exclusively. The Board does not deal in any commodity for resale or sales profit.
444-B. Morgan County, Bridge over Sandy Fork Creek Macon to Athens Road
98

PART THREE

CONSTRUCTION

~-~

-

~~--

--

-

---

----

-----

,_.
8
824-B, Johnson

CONSTRUCTION

COMMENT

The organization and personnel of the engineering units remain the same as last year. There have been a few minor changes in the interest of efficiency that do not affect the personnel of the officials. The chart on one of the first pages of this book will explain the organization of the department.

A full description of the precedure employed in placing projects in line for construction and the method of letting contracts for construction is given in Thirteenth report and it. is deemed unnecessary to repeat the process here.

During the year closing June 30, 1932, the miles of road and the bridges completed were as follows:

Graded, sand clay and top soil roads .......... 192.01 \) miles

Gravel and chert roads. . . . . . . . . . . . . . . . . . . . . . 77.427 miles

l\lacadam base and waterbound macadam roads. 35.485 miles

Snrface treatment roads. . . . . . . .

19.472 miles

Lime rock ("Surface treated") roads .......... 163.761 miles

Bituminous surface mix roads.

. . . . . . . . 38.583 miles

Bituminous macadam roads.

21.7 59 miles

Bitminous concrete roads.. . . . .

. . . . . . . . 11.655 miles

Portland cement concrete roads. .

. . 179.388 miles

Sheet asphalt roads ......................... 29.853 miles

Resmfaced roads. . . . . . . . . . . . . . . . . . . . . . . . . . . 81.088 miles

l\Iaking a total of 160 Projects tot2lling 850.481 miles.

Also, the following bridges were completed:

Timber and I beam bridges.

1.320 miles

Concrete bridges.

. ...... .

.643 miles

Concrete cuherts .......................... . .1 54 miles

A total of 45 Bridge Projects and 2.117 miles.

The following roads were placed under constrnction:

Gradeel, sand clav and top soil roads .......... 385.250 miles

Gravel and dwrt roads. .

. ......... 66.055 miles

.:\Iacadam and water bounr1 macadam roads. . . . 10.280 miles

Surface treatment roads.

. . . . . . .

44.345 miles

Lime rock, surface treated roads.

. ..... 122.815 miles

Bituminous, surface mix roads.

. . . . . . . . . . . 36.030 miles

Bituminous macadam roads.

. ....... 36.87 J miles

Bituminous concrete roads.

. ....... 30.708 miles

Bituminous concrete-rigid base roads... . . . . . . . 1.500 miles

Portland cement concrete roads ............... 227.541 miles

101

Sheet Asphalt roads .................... . Brick roads ........................... . Resurfaced roads ................. .

13.000 miles 5.000 miles 84.615 miles

A total of 224 Proiects and 1064.010 miles.

As is usual and inevitable, some completed projects were brought into the period reported from former years and some projects placed under constr11ction will be carried into future years for completion.

Most constrnction projects are let to contractors, but the Board has a State Construction Force consisting of convict labor on some work and free labor on other projects. The state forces form a separate unit whose head is called Engineer in charge of State forces (or Bituminous Engineer). This Engineer reports direct to the State Highway Engineer. The estimated cost of construction is based on contract prices and the results are in line with contract costs.

Owing to the prevailing low price of construction costs a number of projects were completed under the estimates at a substantial saving to the public.

The increase in motor traffic, both in volume and weight has caused a change in specifications for construction for roads and bridges on the main highways. The heavy tonnage of some vehicles demand a revision of restrictive laws governing the size, weight and load of motor vehicles, otherwise, the majority of motor vehicle users will have to pay for roads to stand unusual and unnecessary strain to accommodate the few.

The foregoing paragraph is not intended to curtail transportation facilities, for it is essential to the growth and development of the State that all methods of transportation by land, water and air should be encouraged for the benefit of the general public.

The section of this report relative to construction covers Surveys, Plans and Blue Prints, Regular Road and Bridge Construction by contract, Construction by State Forces, Laboratory Analysis and Research Work and Purchases. The detail of activities in branches named above follows this introductory comment.

102

Rock Cut, Route 53, Near the County Line Between Gordon and Pickens Counties

Heavy Rock Grading on State Route 53, Between Jasper and Fairmount, in Pickens County

STATE HIGHWAY BOARD OF GEORGIA
STATE MILEAGE BY ENGINEERING DIVISIONS AT JUNE 30, 1932
DIVISION ONE (21 COUNTIES)

COUNTY

Cong. Com'rs Area Popu- Mileage

Dist. Div. Sq. Mi. lation

------------ ---- - - -

----- - -

Bartow __ ---- ----

--

7

CarrolL_ -

- ------

4

Catoosa._ ---

-

7

Chattooga. ----------

--

7

Cherokee ..

--- --

9

Clayton ------

fj

Cobb __

-------

7

Dade.

---

7

Douglas __ -----

---

5

Fannin ... ------- -------

9

Floyd.

----

7

*Fulton .. -

---

5

Gilmer __ ---- ------

9

Gordon ---

---- --------

7

Haralson ___

7

Murray ---- ------

7

Paulding

7

Pickens ____

9

Polk. ----- ---- --- ------

7

Walker ---

7

Whitfield_ --------

7

Totals ... - - ---

----- --------

3

471 25,364 66.!J54

3

4!J2 34,272 74.310

3

169 9,421 15.853

3

328 15,407 33 .130

3

429 20,003 56.579

3

142 10,260 38.772

3

353 35,408 49.782

3

186 4,146 24.100

3

208 9,461 22.975

3

401 12,969 45.008

3

502 48,667 i 88.367

3

541 .335,220 78.582

3

440 7,844 I 51.759

3

375 16,846 56.245

3

284 13,263 36.065

3

342 9,215 51.616

3

324 12,327 54.377

3

231 9,687 42.080

3

317 25,141 49.972

3

432 26,206 48.983

3

283 20,808 47.109

, - - - - - - -

----
_'7",_250

~1,

435-11_,03~618

-

DIVISION TWO (30 COUNTIES)

Banks ______ ---- ---- -----

Barrow.

- - - - - - - - - . ----

Clarke ______ ------ -------

Dawson --- ------- ------

DeKalb ____ ---- ---- -- --

Elbert. ___ ----- - -- ----

Forsyth

-------

.

Franklin .. __

--- -----

Greene ----- -----

... ---

Gwinnett. . - -- ----- -.

Habersham_ --- - - ----

HalL __ - . - - - - - - - - - - -----

Hart_ . -- ---------- ----

Jackson. --------- -

-

Lincoln

- ------- ----

Lumpkin - ---------

Madison __ . ---------

Morgan_ ------------ - --

9

3

9

3

8

3

9

3

5

3

8

3

9

3

8

3

8

3

9

3

9

3

9

3

8

3

9

3

10

3

9

3

8

3

8

3

I I

222 9, 703 168 12,401 114 25,613
216 3,502 272 70,278 361 18,485
247 10,624 27!J 15,902 416 12,616 440 27,853 290 12,748 437 30,313 261 15,174 355 21,609 291 7,847 280 4,927
284 14,921 390 12,488

36.650 33.33!)
35.886 44.104 41.384
74.952 37.390
60.840 60.300 94.020
53.870 75.887 57.940
72.003 39.400
58.349 76.750 51.392

*Fulton County Area, Population, Mileage and Percentage includes that of Area merged into Fulton (Campbell and. Milton.)

105

STATE HIGHWAY BOARD OF GEORGIA
STATE MILEAGE BY ENGINEERING DIVISIONS AT JUNE 30, 1932
DIVISION TWO-Continued

County

Cong. Com'rs Area Popu- Mileage

Dist. Div. Sq. Mi. lation

---------------------l------l------l------1------ ------

Newton ___ .- ______________ _ 8

3

262 17,290 40.429

Oconee ____ .. ______________ _ 8

3

172 8,082 37.260

Oglethorpe _______________ _ 8

3

504 12,927 58.500

Rabun ___________________ _ 9

3

377 6,331 58.559

Rockdale _________________ _ 5

3

119 7,247 19.235

Stephens _________________ _ 9

3

166 11,740 25.659

Taliaferro ________________ _ 10

3

212 6,172 24.986

Towns ___________________ _ 9 Union____________________ .. 9

3 3

181 4,346 324 6,340

38.330 44.160

Walton ___________________ _ 8

3

331 21' 118 52.066

White ____________________ _ 9

3

245 6,056 44.900

Wilkes _____ . _____________ _ 8

3

458 15,944 59.347

Totals ______________ _

_!3,674 450,597 :!_,507 .887

DIVISION THREE (28 COUNTIES)

BBiubtbts_______-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-

6 6

C h a t t a h o o c h e e ____________

4

Coweta____________________ 4

Crawford __________________

6

Dooly ________________ ------ 3

F a y e t t e ____________________

6

IIarris _____________________ 4

IIeard _____________________

4

IIenry _____________________

6

IIouston___________________ 12

Jasper ____________________

6

Jones _____________________

6

L a m a r _____________________

6

Macon__________ - ______ - - -- 3

Marion __ .... ________________ 4

Meriwether ________________

4

M o n r o e ____________________

6

Muscogee __________________ 4

Peach _____________________ 12

Pike ___ .. ___________________

6

Pulaski__ __________________ 12

Schley ____________________ S p a l d i n g __________________

3 6

Talbot _____________________ Taylor_ ____________________

4 3

Troup _____________________ 4

Upson ____________________

6

2

277

2

203

2

218

2

443

2

319

2

397

2

324

2

501

2

285

2

324

2

443

2

321

2

377

2

184

2

332

2

360

2

496

2

470

2

235

2

179

2

237

2

258

2

154

2

209

2

312

2

340

2

435

2

317

Totals _______________ -------- -------- 8,860

77,042 9,345 8,894 25,127 7,020 18,025 8,665
11' 140 9,102 15,924 11,280 8,594 8,992 9,745 16,643 6,968 22,437 11,606 57,558 10,268 10,853 9,005 5,347 23,495 8,458 10,617 36,752 19,509

49.165
31.058 43.032
78.155 51.720 67.615
23.610 43.560 45.570
44.950 63.850
60.250 63.809 34.271 54.957
34.550 56.702
56.923 64.214 30.090
38.942 55.236 28.760
39.262
56.546 62.560 60 .0(10
61.830

478,411 1,401.247

106

STATE HIGHWAY BOARD OF GEORGIA

STATE MILEAGE BY ENGINEERING DIVISIONS AT JUNE 30, 1932
DIVISION FOUR (24 COUNTIES)

County

Cong. Com'rs I Area Popu- I Mileage
Dist. Div. Sq. Mi. lation
-~--

Baldwin ___________ -------- 10

Bleckley___ ---------------

12

Bulloch ______ -------- ---

1

Burke ____ ----- - .. ---- ~--- --

1

Candler __ ----------------

1

Columbia Dodge_

--------------------------------

10 12

Effingham -------- ----

1

Emanuel ____ ---- ---- ----

12

Glascock _____ ----- --------

10

Hancock ____ .. ______

10

Jefferson __________ ----- -

10

Jenkins ____ . ------

--

1

Johnson _______ .. ___ -----

12

Laurens ____________ ------- 12

McDuffie_ ----------- -----

10

Putnam __ -- ---------- ---

8

RScicrehvmeonn__d___-_-_-_-_-_-_-_-_-_-_-_-__-_-

10 1

Treutlen ___________________ 12

Twiggs ___________________ 12

Warren ________________ ---

10

Washington ___________ -- 10

Wilkinson ____ ----- -------

10

2

307 22,878 44.893

2

205 9,133 32.425

2

668 26,509 72.211

2

956 29,224 93.092

2

228 8,991 27.050

2

350 8,793 52.513

2

431 21,599 49.827

2

448 10,164 34.454

2

764 24,101 118.757

2

170 4,388 25.975

2

530 13,070 62.800

2

646 20,727 101.400

2

342 12,908 56.095

2

292 12,681 58.736

2

806 32,693 92.627

2

287 9,014 40.629

2

361 8,367 58.790

2

319 72,990 68.835

2

794 20,503 60.900

2

262 7,488 27.900

2

314 8,372 51.398

2

404 11,181 42.910

2

669 25,030 92.030

2

472 10,844 59.044

Totals _______________ ~--;;c:;-~c:; =~ --~ 11,()__5~ 43_1,_64_8_1,425 .291,

DIVISION FIVE (30) COUNTIES)

Baker _____________________

2

Ben HilL _________________

3

Berrien____________________ 11

Brooks ____________________ 11

Calhoun __________________ 2

C l a y _______________________

3

Colquitt ___________________ Cook ______________________

2 11

Crisp __________________ ----

3

Decatur ___________________

2

Dougherty ________________

2

Early ______________________

2

Grady _____________________ 2

Irwin ______________________ L e e ________________________

11 3

Lowndes __________________ 11

M i l l e r ______________________

2

1

357 7,818

1

256 13,047

1

455 14,646

1

514 21,330

1

284 10,576

1

203 6,943

1

529 30,622

1

241 11,311

1

277 17,343

1

583 23,622

1

342 22,306

1

524 18,273

1

444 19,200

1

378 12,199

1

326 8,328

1

483 29,994

1

253 9,076

42.670 19.201 56.160
75.785 53.950 37.411
77 .sao
44.470
41.651 70.600
50.433 69.440 56.020
46.230 28.017 74.690
46.380

107

STATE HIGHWAY BOARD OF GEORGIA STATE MILEAGE BY ENGINEERING DIVISIONS
AT JUNE 30, 1932
DIVISION FIVE-Continued

County

Cong. Com'rs Area Popu- Mileage

Dist. Div. Sq. Mi. lation
I
------- - - ~------ - - - - - - - - - - - - - - - - - - -

Mitchell

---------

Quitman ------- -Ran<'olph_

Seminole ---------Stewart_

Sumter

TerrelL

Thomas_

Tift

Turner

Webster -Wilcox_

Worth_

Totals_

2

1

548 23,620 74.146

3

1

144 3,820 36.660

..

3

1

412 17' 174 40.174

2

1

240 7,389 25.500

3

1

411 11,114 67.300

3

1

456 26,800 75.718

3

1

322 18,290 42.168

2

1

530 32,612 73.046

2

1

243 16,068 48.040

3

1

231 ll '196 26.218

3

1

302 5,032 24.110

12

1

403 13,439 44.290

2

1

651 21,094 55.370

-~~=~=--- --

--

---

---=-=

=U--,=3-4--2=I=--1-=4=8-4--,=2-8--2-=-

1,523.728
- -- -- - -- --- - -

DIVISION SIX (26 COUNTIES)

Appling Atkinson ____ Bacon Brantley Bryan ____
Camden Charlton ChatJ:lam Clinch Coffee Echols Evans Glynn Jeff Davis Lanier Liberty Long Mcintosh _ Montgomery_ Pierce Tattnall ____ Telfair Toombs ____ Ware wayne_
Wheeler
Totals __

11

1

454 13,314 62.715

11

1

330 6,894 49.343

11

1

271 7,055 32.940

ll

1

434 6,895 48.548

1

1

431 5,952 62.056

11

1

711 6,338 57.103

ll

1

792 4,381 43.838

1

1

370 1(5,431 58.316

11

1

747 7,015 69.311

ll

1

632 19,739 58.380

11

1

362 2,744 55.500

1

1

287 7' 102 20.578

11

1

489 19,400 53.792

11

1

300 8,118 ; 24.806

11

1

191 5,190 40.820

1

1

54:1 8,15:1 34.734

1

1

393 4,180 45.263

1

1

47C 5, 76::) 33.006

12

1

1% 10,(20 47.395

11

1

345 12,522 21.896

1

1

466 15,411 68.860

12

1

373 14,997 55.882

12

1

393 17' Hi5 GO .470

11

1

771 2G,558 78.7lG

11

1

615 12,G47 75.438

12

1

264 9,149 46.339

I ----------

11,574 136Z,133 1,306.045 =-==1 --- ---------

108

STATE HIGHWAY BOARD OF GEORGIA
STATE MILEAGE BY ENGINEERING DIVISIONS AT JUNE 30, 1932
SUMMARY OF DIVISIONS

Area

Div. No. ----

Co
--

un
--

ties I Sq. Mi.
---~-~

l_

21

7,113

2

31 30 I 8,811

3

28

8,860

4_

24

11,025

5

30

I 11.342

6

26

11,574

---------

160 Totals 159

58,725

1930 I Mileage

Mileage

Population. July_1, 1931 _J_u_ly_1_,_19_3~

694, 705 457,327 478,411 431, 648 4'04 ,282 362, 133

860. 732 1,288.034 1,266.290 l, 223. 723 l ,390. 667 1, 109.064

1,032.618 l ,507.887 1,401.247 1,425.291 1,523.728 1,306.045

2,908,506 7,138.510 8,196.816

1932 over Hl31

--- 1,058.306

--------------------------

SUMMARY OF CONGRESSIONAL DISTRICTS

1~30 =========-=-=-=-~-======~====~============

Cong. I

Area

I Mileage I Mileage

Dist. Counties Sq. Mi. _ Population _J~~~1931 July ~19~

--------

1

l__

i 13

6,396

260,291

623.130

666.615

2 ____ ' 13

5,528

242,276

635.625

743.475

3

15

4,563

189,719

579.160

652 .520

4___

10

3,777

220, 708

510. 532

556.699

5

4

1,140

422,206

99.315

162.176

6_--

13

3,614

221,050

548.546

594.562

7--

13

4,366

262,219

545.712

622.553

8_

13

4,193

198,927

667.056

724.452

9___

18

5,449

218,496

748.383

912 .646

10

12

4,657

212,934

548.279

655 .415

11

20

12 ____

15

9,465 5,557

248,290 211,390

928.814 703. 958

1,070.481 835 .222

Totals_ 159

I
58,725 I 2, 908,506 7, 128.510 8,196.816

Dif. 1932 over 193L

--- 1,058.306

SUMMARY OF COMMISSIONERS DIVISIONS

Comm I Div. . Counties

Area

1930

fllileage

Sq. Mi. Population July 1, 1931

-1~~~~-- 56___ l~-16-'-l-846,415 2,499.731

2 ____ -- 52

19,885

910,059 2,490.013

3---

51

16,924 1,152, 032 2,148.766

---- --1-- ------ - ----

Totals 159

58,725 2, 908,506 7,138.510

Mileage July 1, 1932
2,829.773 2,826.538 2,540.505
8,196.816

Dif. 1932 over 1931

1,058.306

109

............
0
Proj . Nc. 406-B, 1931, Grady County, Thomaaville-Tall&h&saee Road, Route No.3, 20' Concrete Paving With Raised Bdge

STATE HIGHWAY BOARD OF GEORGIA
STATE MILEAGE~CONGRESSIONAL DISTRICTS AT JUNE 30, 1932
DISTRICT ONE (13 COUNTIES)

County

Mileage Mileage

Com. Eng. Area Popula- June 30, June 30,

Div. Div. Sq. Mi. tion

1931

1932

Bryan_ ---- ---

1

6

431

5,952 62.038

Bulloch ___ . - -- 2

4

668

26,509 70.590

Burke_

----- 2

4

956

29,224 81.595

Candler ____ ------ 2

4

228

8,991 27.050

Chatham_ -- ----- 1

6

370 105,431 58.316

Effingham -- - ---- 2

4

448

10,164 35.000

Evans ____

---- 1

6

287

7,102 20.578

Jenkins_ - -- --- 2

4

342

12,908 40.000

Liberty_.

----

1

6

543

8,153 34.734

Long __

-- . --

1

6

393

4,180 45.263

Mcintosh._._ ----- 1

6

470

5,763 33.006

Screven ___ ------

2

4

794

20,503 46.100

TattnalL - ----- 1

6

466

15,411 68.860

-------

Totals _______ --

-- --

--

6,396
-::=.---==

260,291 ===---===---

623.130 = -

62.056 72.211 93.092 27.050 58.316 34.454 20.578 56.095 34.734 45.263 33.006 60.900 68.860
666.615

DISTRICT TWO (13 COUNTIES)

Baker ___ ________ 1

5

Calhoun _________ .. 1

5

Colquitt_._ .. _____ 1

5

Decatur. __________ 1

5

Dougherty _____ . __ 1

5

Early ___________ .. 1

5

Grady.

______ 1

5

Miller _____

1

5

MitchelL_ ______ 1

5

Seminole __ ______ 1 5

Thomas_ _ __ _ 1

5

Tift___ _ ___ _____ 1

5

Worth. ____ __ _

1

5

Totals_

--- -------

357 284 529 583 342 524 444 253 548 240 530 243 651
5,528

7,818 10,576 30,622 23,622 22,306 18,273 19,200
9,076 23,620
7,389 32,612 16,068 21,094
242,276

32.770 40.100 77.880 54.392 24.827 55.900 56.020 46.380 54.946 15.900 73.100 48.040 55.370
635.625

42.670 53.950 77.880 70.600 50.433 69.440 56.020 46.380 74.146 25.500 73.046 48.040 55.370
743.475

DISTRICT THREE (15 COUNTIES)

Ben HilL _________ 1

5

256

13,047 13.301 19.201

Clay_________ ----- 1

5

203

6,943 37.411 37.411

Crisp __ . __ - - . ---- 1

5

277

17,343 41.651 41.651

Dooly ___ .. _________ 2

3

397

18,025 45.515 67.615

Lee ____________ --- 1

5

326

8,328 26.900 28.017

Macon_ ___ . _______ 2

3

332

16,643 51.600 54.957

Quitman _______ . __ 1

5

144

3,820 36.660 36.660

111

STATE HIGHWAY BOARD OF GEORGIA

STATE MILEAGE-CONGRESSIONAL DISTRICTS AT JUNE 30, 1932

DISTRICT THREE-Continued.

-----~un-ty 'l,'i~ J\'t;J __ l

Mileage Mileage

s!'::, Popula- June 30, June 30,

tion

1931

1932

Randolph Schley
Stewart Sumter Taylor_
Terrell

1 5 I 412 -~- 17,1741- ~!1.0801 -:.174

2

3

154

5,347' "'8.783' 28.760

1

5

411

11,114 67.950 67.300

1

5

456 i 26,800 76.580 75.718

2

3

340

10,617 33.760 62.560

1

5

322

18' 290 29.641 42.168

Turner Webster
Totals _

1

5

231

11' 196 26.218 26.218

-_1= -

1

4~ 5 _ 1 _ _

302

5ss

5.032 24.Jl0 24.110
1~i:il~ [- ~579~~~~ -:~2~52o

DISTRICT FOUR (10 COUNTIES)

CarrolL

3

Chattahoochee_

2

Coweta

2

Harris_

2

Heard_

2

Marion

2

Meriwether

---

2

Muscogee

2

Talbot __ _

2

Troup

2

~~
Totals_

1 ! 492

3

218

3

443

3

501

3

285

3

360

3

491)

3

235

3

312

3

435

3,777

34,272 8,894 25,127 11,140 9,102 6,968 22,437 57,558 8.458 36,752

72.8!10 37.840 74.490 43.560 39.170 34.550 55.250 50.476 45.846 56.460

74.310 43.032 78.155 43.560 45.570 34.550 56.702 64.214 56.546 60.060

I= 708~ - - - -
_220.

-
=

-

5l~[)(32

556. 6!19

DISTRICT FIVE (4 COUNTIES)
------------------------------

DeKalb Doug-las_ Fulto:r. Rockdale
Totals_

3

2

272

70,278 33. 837 41. 384

3

1

208

9,461 18.640 22.975

3

1

541 335,220 37.880 78.582

3

2

119

7' 2!17

8.958 19.235

1,140 422,206 9_~i~l- ~6~~176_

--~----~-

DISTRICT SIX (13 COUNTIES)

Bibb_
Butts Clayton Crawford_

2 -2
3
2

3

277

3

203

1

142

3

319

--

112

77,042 9,345 10,260 7,020

49.165 ! 31.058 28.610 45.320
----

49. 165 31. 058 38. 772 51. 720

STATE HIGHWAY BOARD OF GEORGIA
STATE MILEAGE-CONGRESSIONAL DISTRICTS AT JUNE 30, 1932
DISTRICT SIX-Continued.

County
Fayette __ Henry Jasper _____ _ Jones. _ Lamar_ Monroe_ Pike _ Spalding Upson __
Totals

I

Mileage Mileage

' Com. I Eng. Area Popula- June 30, I' June 30,

Div. Div. Sq. Mi. tbn

1931

1932

---2T -------

3- - '234 - - 8,665

23.610 I

2

3

324

15,924 44.950

23.610 44.950

2

3

321

8,594 60.250 60.250

2

3

377

8,992 50.109 ' 63.809

2

3

184

9,745 32.380 34.271

2

3

470

11,606 43.640 ' 56.923

2

3

237

10,853 38.931 i 38.942

;)

209

23' 495 38.693 39.262

3

317

19,509 61. 83o 1 61. 83o

3,614

221,050 -54s~~()_l_59Z56~

---I---

--

Bartow_ Catoosa __ Chattooga Cobb Dade Floyd ___ . Gordon __ Haralson_ Murray _ Paulding Polk_ Walker_ ___ _ Whitfield_.
Totals

1

471

1

169

1

328

1

35:-3

1

186

1

502

1

375

1

284

1

342

1

324

1

317

1

432

1

283

____ ]4~366 ---1

25' 364 59 .434 66. 954

9,421 13.431 15.853

15,407 I 32.483 33.130

35 , 408 1 52 . 797 49 . 782

4,146 I 24.100 24.100

48,667 78.997 88.367

16,846 56.245 56.245

13,263 34.711 36.065

9,215 51.616 51.616

12,327 20.854 54.377

25, 141 40. 692 49. 972

26,206 34.303 48.983

1==2~~~1~~1=-~5. 20,808 I 46.049 71_g_

1=64~72.:1_0~9~

DISTRICT EIGHT (13 COUNTIES)

Clarke ___ .__ ----

Elbert

Franklin __ -- ----Greene ____ - ----

Hart __

----

Madison ___ . ---Morgan ____ ---- -Newton _____ .. ---

Oconee ____ ------

Oglethorpe ___ . - ---

Putnam_

-

Walton __

-

Wilkes ____ ------

Totals_

3

2

114 I 25,613 30.570 35.886

3

2

361

18,485 74.100 74.952

3

2

279

15,902 51.540 60.840

3

2

416

12,616 60.300 60.300

3 3

2 2

I 261

15,174

284

14,921

48.690 58.950

57.940 76.750

3

2

390

12,488 51.500 51.392

3

2

262

17,290 40.180 40.429

3

2

172

8,082 37.260 37.260

3

2

504

12,927 58.500 58.500

2

4

361

8,367 58.800 58.790

3

2

331

21,118 45.166 52.066

3

21 %8

15,944 51.500 59.347
----- -----

---- 4,193 198,927 667.056 724.452
=-=---=-===--: ~~~~= -~------ -==-=-~=

113

STATE HIGHWAY BOARD OF GEORGIA STATE MILEAGE-CONGRESSIONAL DISTRICTS
AT JUNE 30, 1932
DISTRICT NINE (18 COUNTIES)

County

Mileage Mileage

Com. Eng. Area Popula- June 30, June 30,

Div. Div. Sq. Mi. tion

1931

1932

--

Banks _______

3

Barrow ____ ------- 3

Cherokee ___ -

3

Dawson ____ - . - 3

F a n n i n _______ ----

3

Forsyth _______

3

Gilmer ____ - . - -- 3

Gwinnett --

3

Habersham __

3

Hall ___

3

Jackson .

3

Lumpkin ___

3

Pickens ______

3

Rabun ____

3

S t e p h e n s ____

3

Towns ___ ---

3

Union __

3

White ___

3

--~--
Totals __ -- -
---

2 222

9,703 29.400 36.650

2

168

12,401 35.076 33.339

l

429

20,003 41.799 56.579

2

216

3,502 32.384 44.104

l

401

12,969 45.008 45.008

2

247

10,624 28.300 37.390

l

440

7,344 35.372 51.759

2

440

27,853 72.470 94.020

2

290

12,748 39.570 53.870

2

437

30,313 76.454 75.887

2

355

21,609 58.340 72.003

2 280

4,927 46.200 58.349

l

231

9,687 44.821 42.080

2

377

6,331 40.290 58.559

2

166

ll '740 25.659 25.659

2

181

4,346 28.580 38.330

2

324

6,340 44.160 44.160

2

245

6,056 24.500 44.900

-----

---- 5,449 _218,496_ 748.383 912.646

==

===--== ====

DISTRICT TEN (12 COUNTIES)

Baldwin__ _

2

4

307

22,878 44.200 44.893

C o l u m b i a __

2

4

350

8,793 34.000 52.513

Glascock__

_ 2

4

170

4,388 14.375 25.975

Hancock______ _ 2

4

530

13,070 62.800 62.800

Jefferson _____ .

2

4

646

20,727 90.000 101.400

Lincoln_ __ __ ____ _ 3

2

291

7,847 32.600 39.400

McDuffie__

_ 2

4

287

9,014 41.206 40.629

Richmond__ ____ _ 2

4

319

72,990 68.036 68.835

Taliaferro_ ___ _ __ 3

2

212

6,172 13.000 24.986

Warren _________ _ 2

4

404

ll' 181 42.853 42.910

Washington __

2

4

669

25,030 61.300 92.030

Wilkinson _

2

4

472

10,844 43.909 59.044

------------------1----

Totals_ _ - - ___ ~~57 _ =c~2 0 934 548. 279 655.415

114

STATE HIGHWAY BOARD OF GEORGIA STATE MILEAGE-CONGRESSIONAL DISTRICTS
AT JUNE 30, 1932
DISTRICT ELEVEN (20 COUNTIES)

County

Mileage Mileage

Com. Eng. Area Popula- June 30, June 30,

Div. Div. Sq. Mi. tion

1931

1932

~~

Appling ________ .. _ 1

6

454

13,314

Atkinson __________ 1

6

330

6,894

Bacon _____________ 1

6

271

7,055

Berrien ___________ 1

5

455

14,646

Brantley __________ 1

6

434

6,895

Brooks ___________ 1

5

514

21,330

Camden_ --------

1

6

711

6,338

Charlton __ ------ 1

6

792

4,381

CC ol ifnf eceh_______________- _-_-_-

1
1

6 6

747 632

7,015 19,739

Cook _____________ 1

5

241

11,311

Echols ____________ 1

6

362

2,744

Glynn _____________ 1

6

439

19,400

Irwin ______________ 1

5

378

12,199

Jeff Lani

Da er_

_v_i_s____________-_-

-

1 1

6 6

300 191

8,118 5,190

Lowndes __________ 1

5

483

29,994

WPiaerrec_e________-_-_-_-_-_---_-_

1 1

6 6

345 771

12,522 26,558

Wayne _________ --- 1

6

615

12,647

---

Totals _____ - ---- ---

9,465

248,290

~~ - - - = = = = = =

62.715 49.343 32.940 56.160 27.048 73.450 42.303 19.238 67.811 33.156 44.470 26.800 53.804 42.480 24.836 40.820 74.690 21.896 78.716 56.138
928.814

62.715 49.343 32.940 56.160 48.548 75.785 57.103 43.838 69.311 58.380 44.470 55.500 53.792 46.230 24.806 40.820 74.690 21.896 78.716 75.438
-
1,070.481

DISTRICT TWELVE (16 COUNTIES)

Bleckley__________ . 2

4

205

Dodge _____ .. ______ _ 2

4

431

EmanueL ________ _ 2

4

764

Houston _________ _ 2

3

443

Johnson _____ .. __ _ 2

4

292

Laurens __________ _ 2

4

806

Montgomery___ . __ 1

6

190

Peach __________ _

2

3

179

Pulaski_ ___ .. _ ___ 2

3

258

Telfair_ _________ _ 1

6

373

Toombs __________ _ 1

6

393

Treutlen __________ _ 2

4

262

Twiggs ___________ _ 2

4

314

Wheeler_ ________ _ 1

6

264

Wilcox ___________ _ 1

5

403

Totals_______ ______ __ ___ 5, 577

9,133 21,599 24,101 11,280 12,681 32,693 10,020 10,268 9,005 14,997 17,165 7,488 8,372 9,149 13,439
211,390

32.425 48.490 107.257 63.850 30.716 75.823 23.395 30.519 54.685 35.995 43.136 15.800 51.398 46.179 44.290
703.958

32.425 49.827 118.757 63.850 58.736 92.627 47.395 30.090 55.236 55.882 60.470 27.900 51.398 46.339 44.290
835.222

115

State Route No.8. Gwinnett County, Lawrenceville and Winder. Raised Edges and Cone Spillway

STATE HIGHWAY BOARD OF GEORGIA
ROUTE MILEAGE ON STATE SYSTEM BY ENGINEERING DIVISIONS AT JUNE 30, 1932

Rte. Division Division Division Division Division Division 'I Total No. No. 1 No. 2 No. 3 No. 4 No. 5 No. 6

-------- -- -------

------

1 119.5731 --- 102.960

123. 721

2

75.758, 68. 669 - - - -- -- - - -- -- -

-

346.254 144.427

3 4

__ 125.4411

97.753 ---- - - - 110. 980

---

334.174

-- -------- 98.422 ------ - 118.361 216.783

5

91.969.

91.969

6 7

---55.8691

103.724 ------- - 103.339

55.869 1. 650 208.713

8

88.4661 118.165------ - ----- --- -------- ----- --- 206.631

~ ~1481 9
lO - 27

57. 819 - -- - - - - - -

- - - - -- - - - - -

105.042 -------

14.000 -------

84.967 119.042

11

137.498 111.162 -----

92.165 33.600, 374.425

12

97. 555 - -- - - - - 58. 552 - - - - - - - --

13 14

2.2001 95. 927 --- - - - - - -- - - - - --- -- - - - -

___ 22.860-

60.645--

- --------- -------

15

140.907 -------- 94.940--------- 47.418

16

14.000 -

90.371 63.400----- --- --- ---

156.107 98.127 83.505 283.265 167.771

17

99.315 ---

64.329 -------- --------- 163.644

18 19

77. 628 - ----- - --- -- --- ---- -43.310 31.658---------

77.628 74.968

20

80.852 61.500 --- ----- ---

---- ----- --- ----- 142.352

21 22

-- -I

- - 112. 922 - -- - - - -

7. 600 120.522

91. 278 33. 530 - -- - - - - -- - - - - - - - - 124.808

23

--

49.025-------- 112.674 161.699

24

50.250------- 143.064------------ -- - 193.314

25

- - ---- ------ - ---- -- -- 126.286 126.286

26

---- ---- 100.804 140.324--- ----- 35.002 276.130

27

- ----- --- 10.056 22.537------ -- 116.078 148.671

28

---- ----- 39.050 ----- -- 82.400 ------ - 121.450

29 30

- -- - --- - ----- --- 71.487 --- ----- 18.650 90.137 --- - - ---- ------ 14.190 60.636 121.400 196.226

31 32 33 34 35 36

12.000 90.650

--- --------- 38.460 36.654

100.016 -

29. 820 -- -- - - - - - - - - -

- - - - - - 38. 250 - -- -

55.598------

--- -.-- -- -

102.650 75.114 100.016 29.820 38.250 55.598

37

117.661 ----

117.661

38

127.207 118.521 245.728

39

21. 350 -- - - - -

21.350

40

32.606 32.606

41

73.714-----

73.714

42 43 44

14.236 16.280

.219 49.65839.127 ______ _

I _

14.047 -9.700 -

1----- - -

64.113 55.407 23.747

45 46 47 48

I
-~~~~:~6ol

2o.3ool_ --:s:7~o- -------
47.742-------- 20.300----- --- ---- -- -
I--------- -- ----- --------

18.770 20.300 68.042 14.160

117

STATE HIGHWAY BOARD OF GEORGIA ROUTE MILEAGE ON STATE SYSTEM
BY ENGINEERING DIVISIONS AT JUNE 30, 1932
Rte. Division Division Division Division Division Division Total No. No. 1 No. 2 No. 3 No. 4 No. 6 No. 6

49

43.517-------

8.971

- 52.488

50

129.766 92.296 222.062

51

18.850-

18.850

52

--

13.431 -----

13.431

53

83.596 50.479-

134.075

54

17.490 .

12.810--------

30.300

54B

16.560------

16.560

55

7 0 032 ----- -- 58 0 726 --------- 65.758

56

57 0 250 - - - - - - - - 32 0 900 90.150

57

4.700 79.916

84.616

58

24.100-

24.100

59

32.536

32.536

60

4.069-

4.069

61

85.791

85.791

62

60.120

60.120

63

12.892 12.892

64

30.760 30.760

65

21.200 -

21.200

66

5.500

-

5.500

67

20.701

20.701

68

14.900

14.900

69

1.540-

1.540

70

6.800

6.800

7l

14.400 ----

14.400

72

14.700 -

-

14.700

73

21.490

7.569 29.059

74

30.560 - . -

30.560

75

28.950 -

28.950

76

47.140

47.140

77

73.100 --

73.100

78

26.955 -

26.955

79

24.900-

24.900

80

30.000

30.000

81

10.480 14.740 -

25.220

82

16.600

16.600

83

12.200 13.980

26.180

84

4.100

4.100

85

36.918 ---

36.918

86

16.300

--

16.300

87

6.600 47.400 --------

54.000

88

8 0 941 - -- - -- - - -

8.941

89

56.078 56.078

90

27.100 ---

27.100

91

74 0 550 . - ---

74.550

92

12 0 800 - - - - -

12.800

93

31.050 ----

31.050

94

30.200 30.200

95

10.679 ---

10.679

118

STATE HIGHWAY BOARD OF GEORGIA ROUTE MILEAGE ON STATE SYSTEM
BY ENGINEERING DIVISIONS AT JUNE 30, 1932
Rte. Division Division Division Division Division Division Total No. No. 1 No. 2 No. 3 No. 4 No. 6 No. 6

96 ------ - -------- - - 45 .900 ------------- - -------- - ----

97 - -- - -- - ---- -- --- ---- - -------- - ---- 35.600 ---- - ----

98

7.250 ---- - --- ---- - ------- - -- -- - --- - -- --

99 ---- - - --- .--- - ----

-- ----- ---- - ---- 26.200

100 ------ - -- ------ --- 10.400 --- - ---- ---- - ---- ---- - ----

101

18.650 ------ - -- --- - --- - -- - ---- ---- - ---- - - - -- - ---

102 ------ - -- -------- - ------ -- 22.100 ------ - -- ------ - --

103 ------ - ---------- - 19 .750 -------- --- - ---- - - ----- - -

104 -------- - -- - ---- ----- - - 19 .527 ------ --- ------ - --

105 ----- --- - 8 . 100 ------ - - ----- - - - ------ - -- -- - - .. ---

106 --------- 27. 100 ----- -- ------- - -------- - -------- -

107 -------- - --------- ------ - -- --------- 9. 650 -------- -

45 .900 35 .600
7.250 26.200 10.400
18.650 22. 100 19.750 19.527
8. 100 27 .100 9.650

~ 1,032.6181,507 .8871,401.2471,425.2911,523.7281 ,306.045 8, 196.816

Richmond County, Sand Bar Ferry, Bridge Over Savannah, at Augusta, Ga., Side, Temporary Bridge at Right
119

STATE HIGHWAY BOARD OF GEORGIA STATE MILEAGE-CONGRESSIONAL DISTRICTS
BY ROUTE NUMBERS-AT JUNE 30, 1932.

~ist. Route C-oun-1 Co. I Dist. D-ist. Di:t.- Dist. - Dist. Dist. Dist.

Dist. Dist. Dist. I Dist.

Total

No. ties Seats One Two Three Four Five Six Seven Eight Nine Ten Eleven Twelve Miles

- - - "---" -" - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - - - -

1

18

16

2

8

8

70 .202 53 .519 123 .490

99 .043 49.776

94.651

-----_II
- - --

346.254 144.427

3

19

17

71.652 82.618

11.700 70.983 97.221

-- - -

- 334.174

4

8

8

- "-

59.285 92.273 65.225 216.783

5

5

5

8.861

83.108

91.969

6

3

2

- 55.869

-

55.869

7

13

13

19 .130 52 .044 ---

-- 54 .465

-

53.680 29.394 208.713

8

13

9

37 .480 33 .240

27 0 711 66 .814 41.386

206.631

9

4

4

- 27.148-

57.819

84.967

H10

8

"0 "

i~

G 1i

! -

j 13 .301 :-

11 .346
2~ :~~~ 61.760

--- 79.666 14.030 14.000

31.658 105.840

62.580

71.738:

89.060,

72.806

119.042 374.425 156.107

88.827

!

98.127

14

3

3

60.645 22.860 -

83.505

15

16

12

16 17

8 13

8 8

23 ~800!-

42.460

61.911

49 .540 91 .367 54 .800 26.200 --- 37.200 64 .815 34 .500 40 .529

19.305

68.253

283.265 167.771 163.644

18

6

5

23.518

54.110

77.628

19

6

5

--

43.310

-

1.560 -

30.098 74.968

20

7

6 - --

--- - 10.200------- 51.922 7 .860 72 .370

-

142.352

21

6

6 104.214

--

16.308

120.522

22

9

7

38 .452 ------- 46 0 776 --

33.530

- .. - 124.808

23

8

7 90.2991

-

58.300 13.100 161.699

24

10

9 53.297

59 .590 13 .550 66 .877.

193.314

25 26

6 14

4 10

8713..9767371

38 .180 34 .260 -

54.323

126.286

119.913 276.130

27

7

7

93.520 55.151 148.671

28

6

6 --- -1

- 108.050

29

6

4

34.188

13.400 121.450 55.949 90.137

STATE HIGHWAY BOARD OF GEORGIA STATE MILEAGE-CONGRESSIONAL DISTRICTS
BY ROUTE NUMBERS-AT JUNE 30, 1!!32.

Dis~. Di~t. Ro.ute IC.oun-[ Co. Dist. I

Dist. Dist.l Dist.

Dist. Dist.l Dist.

No. . ties I Seats One [ Two Three Four Five Six Seven Eight Nine

--30--- --;1_1_10- 59.222 --~ 39 .75C --~--- -~- - - ----~-

~~~- I E~~~!n

Dist. Twelve

i- - - - 97.253

Total Miles
196 .226

31

5

32

4

33

4

34

2

35

2

36

3

37

6

:18

14

39

2

4C

2

41

4

42

6

43

4

44

2

45

2

46

2

47

4

48

1

49

3

50

12

51

2

52

2

53

7

54

3

54-B

2

55

5

56

5

57

7

5

--

83 .050 19 .600 102 .650

3

9 .5CO-

3

60 .810 8 .CCC

2

29.82C

'

65.614

I

31.206

I

75.114 1oo.o16
29.820

2

38.25C

1

38.250

2

6

- 102 .68C 14.981

50.298 5 .s_ool

- -- I

-I 55 .59s 117.661

12 31.430 84.888

-

129:410

245.728

2 2 3

~~ 21.350

-- I

73.714 5.9l3 58.2001:

-I

,

32.606:

2~1t.r3[5~0

4

2

_ _____ 1 _ _ 55 .4071

55 .407

2

i

1

18 .77CI'

2 20 .30(' - -

4

1 3

1-- : :1-33.928

--- -I 14.047 - I 9.700

I

----

-

- --

~ ~ 18 342I
__ : __ :jl4.16oi

49

- - - -- I

-. - -~- - - - -_I'

18 .560

23.747 18.770 20.300
~tr~~
52 .488

10

52 .823 59 .57::li

2

1

'
-~::-:~~-58.~701 18.S5C! 75.305 13.4311'

222.062
J!:~~[

6

2

3. 780 26 .520 __ _

__ I

30 .3oo

1 3 4 4

--- -I'-

-I

8.850 49.8761

22 .9CO -

-

- --

---

5. 760 ---- - 10 .800

16.560

7 .032

__

--

--

I

-- -

--

65 .75" 67 .25G 90.150

4.70011_

- 32.596_

47.320 84.616

~~-----~--'-------------~ ~~~~~~--'--~~-

STATE HIGHWAY BOARD OF GEORGIA STATE MILEAGE-CONGRESSIONAL DISTRICTS
BY ROUTE NUMBERS-AT JUNE 30,1932.

Route Coun- Co. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Total

No. ties Seats One Two Three Four Five Six Seven Eight Nine Ten Eleven Twelve Miles

- - - - - - - - - - - - - - - - - - - - - -------------------1----1--~ 1 - - - -

58

1

1

------- ------- 24.100

24.100

59

4

1

25 .090 7 .446

32.536

60

1

0

4.069-------

4.069

61

6

4

2.300 2.100------- 81.391

85.791

62

3

1 - - - - - -- 60 .120 - - - - - --

- - - - - -- - -- - - --

- - - - - -- - - - - - -- - - - - - -- - -- - - -- -- - -- -- -- -- 60.120

63

1

0 12 .892 ------- ------- ------- ------- ------- -------

12.892

64

2

0 16.560------- ------- ----- - ------ ------ -------

14.200 ----- -- 30.760

65

2

2 ------- 14.100------- ------- --------

66

1

0

5.500-

7.100----

21.200 5.500

...... 67 N 68 N 69

2

1 20.701 ------- ------- ---

1

0

1

1

14.900 1.540 ------- --

20.701 14.900
1.540

70

1

1

6.800----

6.800

7l

1

1

72

2

2

14.400----- -- ----- ---14.700 --- --- ------- ------- ------- ---------

14.400 14.700

73

3

1 29 .059 ------- ------- ------- -------

29.059

74

3

1

30.560--

30.560

75

2

1

28.950 -------

28.950

76

3

2

47.140--------- 47.140

77

4

3

73.100 -- ---

73.100

78

2

1

------- ------- 12.405

14.550 26.955

79

2

1

so

3

2

-------

9 .900 ------- 15 .000 -30.000

24.900 30.000

81

2

2

14.740

10.480- ----- -- --

25.220

82

2

0

16.600------- -------

16.600

83

2

2

13 .980 ----- 12 .200 ------- -------

26.180

84

1

0

85

3

1

86

1

0

h --------

- -- 4.100- --

---------

4.100

36 .928 ~ ______ __ ___ _~ ~ ~ ~ ~ ~ __ ~ ~ ~ ~ ~ ~ ~ 6:Sao ~ _~ ~ ~ _: _::~ :__ :: :::::::~:

36.928 16.300

STATE HIGHWAY BOARD OF GEORGIA STATE MILEAGE-CONGRESSIONAL DISTRICTS
BY ROUTE NUMBERS-AT JUNE 30, 1932.

Route Coun- Co. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Total No. ties Seats One Two Three Four Five Six Seven Eight Nine Ten Eleven Twelve Miles

-~~~~- -~---- - - - - - - - - - - - - - - - - - - -~-----~~-1-~~-1-~~- - - - -

87

88

89

90

91

92

93

94

95

..... 96

w1\:)

97 98

99

100

101

102

103

104

105

106

4

3

6 .600 ------- ------- - -

47.400 54.000

1

0

8.941

8.941

3

1

56.078------

56.078

2

1

27.100

27.100

4

4

74.550------- --------

74.550

2

1

2.800 ----- 10.000

12.800

2

1

31.050 ------- -----

31.050

2

1

30.200--------- 30.200

1

0

10.679

10.679

3

1

28 .800 10 .700

6 .400 - - - -- -- - -- -

45.900

2

2

- 35 .600 -------

35.600

1

1

7.250------- --

7.250

2

1 26.200

26.200

3

0

10.400 ------- ------- -------

10.400

2

0

- - - - - - -- - -- - - -- - -- -- -- 18 .650 - - - - -- - -- -- -- - -- - - --

18.650

2

1

----- ------ ------- ------- 22.100

22.100

2

1

19.750 -----

19.750

2

0

19.527

19.527

1

0

8.100-

8.100

2

1

- 27.100 -

27.100

107

2 I

1

5.900-

3.750

9.650

~~- - - - ~-- - - - - - - - - - - - - - - - - - - - - - 1 - - - - ----1-~~-

Tota!ls_ -- 666 .615 743 .475 652 .520 556 .699 162 .176 594 .562i622 .553 724.452 912 .646 655 .415 1,070 .481 835 .222 8,196 .816

Note: Longest State Route No. 11. From N. C. Line near Blairsville to Fla. Line near Statenville, penetrating or touching the following Counties:
Union, Lumpkin, White, Hall, Jackson, Barrow, Walton, Newton, Jasper, Jones, Bibb, Houston, Pulaski, Wilcox, Ben Hill. Irwin, Berrien, Lanier, Lowndes and Echols. Length 374.425 miles.
Shortest State Route No. 69, N. C. Line to Hiawassee, Towns Co. Length 1. 540 miles.

SURVEYS Survey parties have continued their work of locating new highways and relocating old ones, for further improvement. The total length of these surveys for the Fiscal year was approximately 1,500 miles. Surveys have been made far enough in advance of construction to permit the suspension of the survey parties for the present.
PLANS Plans have been prepared during the Fiscal year for a large amount of work by counties and State convict forces in addition to plans for the Federal Aid and Emergency Program and State Aid Work. The total length of plans completed during the year was 1,151 miles.
BLUE PRINTS The blue printing machine has operated almost contin.uously during the year, taking care of printing all plans and special work. A total of 470,000 square feet has been printed at an estimated saving of $4, 700.00. In addition to the saving in money there is also a great saving in time by having prints made quickly as they are needed. A large amount of work has also been d~ne by the Photostat machine at a saving in cost and great convemence.
Proj. 44t-A. Morgan County, Bridge Over Hard Labor Creek Athens to Macon 124


......
0"1'
Route 2. Gilmer County, Under construction, Home of Henry Grady 's Grandfather

STATE HIGHWAY BOARD OF GEORGIA PROJECTS COMPLETED AND CLOSED BY ENGINEERING DIVISIONS-FISCAL YEAR ENDING
JUNE 30, 1932
DIVISION ONE

Mac.

Bitumi-

Project

County

Graded Gravel Base and Surface Lime-rock nous Bitumi- Bitumi- Cement Resur-

No.

Sand-clay Chert W. B. Treat. Surface Surface nous

nous Concrete faced

Top-soil

Mac.

Treated Mixture Mac. Concrete

- - - - - - - - - - - - - - - 1 - - - - - -~-------1----1----------------------

34_ __ ___ Haralson . _ 54 ______ Floyd ___ _
85 ______ Haralson __
86____ Haralson ________ _ ,_. 87 ____ . Haralson __ _
& 120_____ CarrolL __
224 _____ Gordon ___ _
248-A ___ CarrolL __

5.644
5.193 4.466 3.771 8.313

2.311

4.986

---- . -
2.390

248-B ___ CarrolL __ 248-B ___ CarrolL __ _ 426-A ___ Gordon _____ _
426-C ___ Bartow ________ _

4.621 .719

---
4.350 4.960

806-C ___ Whitfield__ _ 986-C ___ Gordon _____ _

-
3.420

5.178

986-C ___ Gordon_ __ 988-D ___ Floyd __ _ 995 _____ Fannin __ _

--------
3.726

3.414

-
3.430

996-B ___ Bartow __ 997-D __ Murray__ _

----
1.969

5.914

997-E ___ Murray__

2.707

- - - - - - - - - ------1----1----1----1----1---~~--- -~-

30.807 8.402

3.414

11.655 10.326 16.878

STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF MILES & TYPES OF COMPLETED ROADS FISCAL YEAR ENDING JUNE 30, 1932
DIVISION ONE

Projects

Type of Roads

Miles

3____ Bituminous Concrete ___ _ L ___ Bituminous Surface Mixture ___ _ 3____ Cement Concrete 2 ____ Chert_ __ 6____ Graded ____ _ L ___ Gravel ___ _ 4 ____ Resurfaced_
-------
Total 20_ __ All Types ___ _

11.655 3.414 10.326 6.433 30.807 1. 969 16.878
81.482

127

STATE HIGHWAY BOARD OF GEORGIA

PROJECTS COMPLETED AND CLOSED BY ENGINEERING DIVISIONS-FISCAL YEAR ENDING
JUNE 30, 1932

DIVISION TWO

Project No.

County

22_ ____ I Milton ___ _
23_ ____ Forsyth_ 48_ ___ Clarke ___ _
-1 117____ Gwi:~mett __ _
126-B ___ Madison ____ _ 128 _____ Barrow ______ _

--- ---------- -

~raded ~- Gravel IBa~ea~n~ I ~urface ILime-rock~-B~I~~i-

Sand-clay Chert W. B. Treat. Surface Surface

I. Top-soil

Mac.

Treated Mixture

--- --~-------~-9.996 1

11.309 .

9.475

I

I

Bitumi- I Bitumi- I Cement Resur-

nous nous I Concrete faced

Mac. I Concrete

_ _,__ __

4. 785 .

3.250 7.996
I
I

128-B ___ Barrow ____ _

-i

,_. 162 _____ Gwinnett_ __ _

~~~~=~~= ~~:~~:~~-----

1.0631

i

6.170

I

1.129 ,,

3.274

247-A ___ 1 DeKalb ___ _ 247-B ___ DeKalb ____ _ 330 _____ Elbert_
332_ __ White _ 361-A __ Hart ___ _
372-B __ Elbert _ 382-B ___ Stephens __ _ 382-E ___ Stephens_ 402-A ___ Franklin 402-0 __ __ Franklin 41L ____ DeKalb __ _

-I
_I
I
I -- I

5.954 5.820
.180 :1

2.144 4.824 2.108 1.780 2.837 2.372

8.740

434-B_ _ Clarke ___ _ 444-A ___ Oconee __ _ 444-B ___ Morgan __ _ 444-B ___ Morgan ____ _ 458-A_ _ Lumpkin _
469_::_::_-___ G\\'innet_:_t_ __:___:__ _

l1.411 .286
7.441

1.022 I
14.250

8.937

STATE HIGHWAY BOARD OF GEORGIA
PROJECTS COMPLETED AND CLOSED BY ENGINEERING DIVISIONS-FISCAL YEAR ENDING
JUNE 30, 1932 DIVISION TWO

Mac. - - - - - - 1

Bitumi-

Project

County

Graded Gravel Base and Surface Lime-rock nous Bitumi- Bitumi- Cement Resur-

No.

Sand-clay Chert W. B. Treat. Surface Surface nous

nous Concrete faced

Top-soil

Mac.

Treated Mixture Mac. Concrete

- - - - - - - - - - - - - - - - - - - - - - - - - ---~~-------

---~-

------- -

- - ----~

--~-

469 __ Gwinnett

.277

483-B Madison_

2.299

613_-- Union _ 68L_ Jackson 754 ____ _ Barrow __

3.363

1.100

6.653

856-B __ _ Oglethorpe __ _

9.178

964-D __ Greene _

4.541

979-A __ _ Banks _ ~ 982 ____ _ Dawson_ on 983-B __ _ Jackson_

4.149 9.349

4.605

984-A~-- Union_

6.637

1050 ___ _ DeKalb ___ _

.086

1056___ _ Barrow

1.707

- - - - - ----~1~---1------ - - - - - - - - - ----~ - - - - ---~----~ - - - -

47.994 21.305 35.485 7.675

5.000 9.390

44.492 26.256

SUMMARY OF MILES AND TYPES OF ROADS COMPLETED FISCAL YEAR ENDING JUNE 30, 1932

Projects

Type of Roads

Miles

Projects

Type of Roads

Miles

------ ---------------------- ----- --------------------------

2

Bituminous macadam __

9.390

4 Resurfaced __ _

26.256

1

Bituminous Surface Mixture __ _

5.000

2 Surface Treatment

7.675

16

Cement Concrete_

44.492

3 Top-soiL __

16.018

2

Chert ___ _

21.305

5

Graded ___ _

31.976 Total 40 All Types __

197.597

5

Macadam_

35.485

STATE HIGHWAY BOARD OF GEORGIA
PROJECTS COMPLETED AND CLOSED
BY ENGINEERING DIVISIONS-FISCAL YEAR ENDING JUNE 30, 1932
DIVISION THREE

Project
No.

County

Graded Gravel Sand-clay Chert

Mac.

Bitumi-

Base and Surface Lime-rock nous

W. B. Treat. Surface Surface

Bituminous

Bitumi- Cement nous Concrete

Resurfaced

Top-soil

Mac.

Treated Mixture Mac. Concrete

17-A ___ Harris __ _ 17-A_ _ Harris ____ _ 46 ____ . Bibb _____ _ 113 _____ PulaskL __ .

20.217

---------~---1---1----1----1---
2.947
.648

183-B ___ Spalding._ ,_. 259-B ___ Pike ___ _ ~ 346 _____ Upson ____ _
401-B ___ Houston __ 418-B __ Monroe _____ _ 436-B ___ Houston ____ _ 475-A ___ PulaskL __ 485-A_ __ 0 hattahoochee ._ 651 _____ Pike _____ _ 895 ____ Pike ________ _
932-B ___ Pulaski __ _ 938 _____ Houston _________ _ 941-B ___ PulaskL __ _ 945-B ___ Peach _____ _ 951-0 ___ Marion ____ _ 951-0 ___ Marion ___ _ 973-A ___ Henry_____ _
976-B ___ Jasper. ___ _

-
8.707
.795 1.534 2.138

-
6.449

6.862
--
9.933
4.490 11.284

5.696
6.658 .036 .068

8.000 9.555

.857

.195

---- --- .--- ------------------- -------------1----

Totals __ _

33.391 6.449

37.813

17.105 17.555

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILES & TYPES OF ROADS COMPLETED
FISCAL YEAR ENDING JUNE 30, 1932
DIVISION THREE

Projects

Type of Roads

Miles

8____ Cement Concrete__ . _ 3 ___ . Graded ______________ _ L ___ GraveL ____________ _ 6 ____ Limerock, Surface Treated 2 ____ Resurfaced_____ _ 2 ____ Sand-clay_
Total 22 ___ All Types _________ _

17.105 29.719
6.449 37.813 17.555
3.672
-1 112.313

131

-

-----=-~--

STATE HIGHWAY BOARD OF GEORGIA PROJECTS COMPLETED AND CLOSED BY ENGINEERING DIVISIONS-FISCAL YEAR ENDING
JUNE 30, 1932 DIVISION FOUR

I Project No.

County

Graded Sand-clay
I Top-soil

Gravel Chert

BaMseaca.nd I Surface Lime-rockl Bri.touums i-l Bitumi- Bitumi-1 Cement I Resur-

W. B. Treat. Surface Surface nous

nous Concrete faced

Mac.

I Treated Mixture Mac. I Concrete

29-0 __ EmanueL_

112 _____ Laurens

.651

138-B ___ Hancock __

1.620

141-0 __ Richmond

170-A. McDuffie _

170-B __ McDuffie _

170-B __ McDuffie

197-A_ Bulloch_

197-B __ Bulloch

:;; 207-A ____ Effingham__ ___ _

!'<>207-B ___ Effingham __

229 _____ Bulloch_

366_

Bulloch_

409-A ___ Putnam

470-A_ Laurens _____ _

17.020

471-A_ McDuffie __ _

4.482

472-A ___ Richmond __

472-B _. _ Burke_

475-B ___ Dodge.

477-A ___ Putnam_

629 _____ Richmond_

756 _____ Baldwin ___ _

4.797

772-A ___ McDuffie ______ _

955 _____ Putnam_

7.000

958-B __ Jefferson __ _

6.592

968-A_ _ Washington_

.504

1010 ____ Washington _________ _

.614

-----------------------

8.488
.438 4.553 5.800
.236 2.250 1.438
.551 1.114 12.275 7.780 1.457
16.232 8.545
6.726 3.255
.638

STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF MILES & TYPES OF ROADS COMPLETED FISCAL YEAR ENDING JUNE 30, 1932 DIVISION FOUR

Projects

Type of Roads

Miles

-----1-------------------- ------------ ---

17 ____ Cement Concrete _ 3____ Graded ___ _
3 __ Limerock, Surface Treated __ 1____ Sand-clay_ 2_ _ Surface treatment__ L _ Top-soil

81.776 19.291
8.941 6.592
11.797 4.482

Total 27 __ All types_

132.879

133

STATE HIGHWAY BOARD OF GEORGIA PROJECTS COMPLETED AND CLOSED BY ENGINEERING DIVISIONS-FISCAL YEAR ENDING
JUNE 30, 1932 DIVISION FIVE

Project No.

County

I Graded Gravel
Sand-clay Chert Top-soil

I BaMseaca.nd Surface Lime-rock nous Bitumi-
I I "' "m'-1 W. B. Treat. Surface Surface nous

Mac.

Treated Mixture Mac.

I Sheet Bitumi-1 Cement
Asphalt nous Concrete Concrete

Resurfaced

:[ 100-D ___ Terrell __
208-B ___ Terrell _ 325-A _Grady _

I

.945 7.838

.587
--

325-D __ Decatur_

11.017

325-D_ Decatur_

.626

347-- - _Terrell 047-A ___ TerrelL

11.007 .439

408-C_ -- Stewart_ __ _ 7.635 430-C ___ Terrell

9.152

....., 430-E Lee ____

6.595

:i:;:431-A. _Lowndes

14.653

431-B __ Lowndes_

4.220

442-A __ Seminole_

8.352

442-A_ Seminole __

8.350

456-B ___ Early

.117

474-B ___ Grady __

7.828

480-A ___ Seminole 485-C __ Stewart_

10.369

6.181

487-A _ _ Colquitt 487-B ___ Colquitt

4.765 4.851

841-B __ Grady __

.086

912-B ___ Irwin

11.160

912-B ___ Irwin __

11.294

947-A ___ Stewart ___

10.849

1002-A _ Worth __

10.910

1006 ____ Quitman

.321

1015-A_ Colquitt. ___ 9.628

1059 - - Seminole ___
- - - - - - - - - - - - - - - - - - --------- - - - - -

1.075
----- ----

Totals ___ 32.007 41.271

39.188

.626 12.369 29.853

25.536 ---------

-----------------------------------~~~~~~~

STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF MILES & TYPES OF ROADS COMPLETED FISCAL YEAR ENDING JUNE 30, 1932 DIVISION FIVE

Projects

Type of Roads

Miles

---------1------

- - - - ------.

2_ _ Bituminous Macadam ___ _

L ___ Bituminous Surface Mixture ______ _

5. ___ Cement Concrete ___ -------.----------

4____ Graded_____

_________ _

4 ____ GraveL___

__

7____ Limerock, Surface Treated ________ _

l. ___ Sand-clay ______ _

4____ Sheet Asphalt__ ___

12.369
.626 25.536 24.372
41.271 39.188
7.635 29.853

Total 28 All Types ___ _

--------~~-180.800

135

STATE HIGHWAY BOARD OF GEORGIA
PROJECTS COMPLETED AND CLOSED
BY ENGINEERING DIVISIONS-FISCAL YEAR ENDING JUNE 30, 1932
DIVISION SIX

Mac.

Bitumi-

Project

County

Graded Gravel Base and Surface Lime-rock nous Bitumi- Bitumi- Cement Resur-

No.

Sand-clay Chert W. B. Treat. Surface Surface nous

nous Concrete faced

Top-soil

Mac.

Treated Mixture Mac. Concrete

---- ----------------1----1---- --------------------------------

8 ______ _ Montgomery __ _

.153

77------ Charlton ____ _ 149 ____ _ Telfair_ _____ _
210-A __ _ Jeff Davis _______ _ 210-B __ _ Telfair_ _______________ _ 210-C_-- Jeff Davis__________ _ .__. 265-A __ _ Telfair_ _ __ _________ _
85 265-B __ _ Telfair __ _
322-B __ _ Wayne ________________ _ 388-C_ -- Brantley ____ _

10.260
2.166
7.436 1.444 12.807 2.625

.014 4.052

19.310

388-E __ _ Brantley __

5.162

388-F __ _ Brantley __ _ 388-H__ _ Glynn __________ _

5.044 12.786

431-C_-- Clinch __

6.360

431-C_-- Clinch __ _ 476-A __ _ Jeff Davis ____ _

4.977

1.089

476-A __ _ Jeff Davis _____ _

.076

476-B __ _ Appling__________ _

10.630

481-A __ _ Coffee _______ _ 832-A __ _ Jeff Davis _______ _ 908-B __ _ Coffee ________
908-C __ _ Coffee ________ _ 908-E __ _ Coffee _______ _

12.469

11.729

12.378 .662
1.731

---- -------------------------------------- -----1----

Totals_ _____

17. 446 _

77. 819

--------~~----~-----~------~------

29 . 543

.153 20.399

STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF MILES & TYPES OF ROADS COMPLETED FISCAL YEAR ENDING JUNE 30, 1932 DIVISION SIX

Projects

Type of Roads

Miles

7____ Bituminous Surface Mixture_ L ___ Cement Concrete_ 2____ Graded. ____ _ 1L ___ Lime-rock, Surface Treated_ 2 ____ Resurfaced ____ _
Total 23 All Types__ __

29.543 .153
17.446 77.819 20.399
145.360

137

STATE HIGHWAY BOARD OF GEORGIA MILES AND TYPES OF ROAD COMPLETED AND PROJECTS CLOSED BY ENGINEERING DIVISIONS FISCAL YEAR ENDING JUNE 30, 1932
RECAPITULATION

Miles

Miles

Miles

Miles

Miles

Miles

Total

Proj.

Types of Road

Div.

Div.

Div.

Div.

Div.

Div.

Miles

One

Two

Three

Four

Five

Six

All Divs.

- - - - - - ------~~- - - - - - - - - - 1 - - - - - - - - - ----~--- - - - - - - - - - - - - - - 1 - - - - - 1 - - - - - - -

3 Bituminous Concrete __ _

11.655

11.655

4 Bituminous Macadam_

9.390

12.369

21.759

10 Bituminous Surface Mix._

3.414

5.000

.626

29.543

38.583

50 Cement Concrete _________ _ 4 Chert ____________ _ 23 Graded ___________________ ~~

10.326 6.433 30.807

44.492 21.305 31.976

17.105 29 0 719

81.776 19.291

25.536 24.372

.153 17.446

179.388 27.738 153.611

r; GraveL ___________ - - - -- -

1.969

6.449

41.271

49.689

27 Lime-rock, Surface Treated_ -~ _

37.813

8.941

39.188

77.819

163.761

5 Macadam ___________ _

35.485

35.485

12

Resurfaced-~~-~-----

4 Sand-clay _________ _

--1 16.878 26.256

17.555 3.672

6.592

7.635

20.399

81.088 17.899

4 Sheet Asphalt ___ _

29.853

29.853

4 Surface Treatment

7.675

ll. 797 -----------

19.472

4 Top-soiL _________ _

16.018

4 .482

- -- -- -- - -- -

20 .500

-~-~i~~---~_____-_-_---_---_----_---_--_---~-1-_-8-_-1-_~.--_4-8- _2~-- 1--~- _.~_1 5_- 193- _27- .8~7- -9--11 -~- -1- 8-0- 3.8--510- 3~------1-4~-5--.-36--0-1 ~-----8--5~0--.-4-8-1--

- - - - - - - - - - - - - - - --

No. of Prcj.

Type of Road

STATE HIGHWAY BOARD OF GEORGIA
TYPES AND MILES OF ROAD COMPLETED AND CLOSED BY CONGRESSIONAL DISTRICTS-FISCAL YEAR, JUNE 30, 1932
RECAPITULATION

Miles Cong. Dist. One

Miles Con g. Dist. Two

Miles Cong. Dist. Three

Miles Cong. Dist. Four

Miles Cong. Dist. Five

Miles Cong. Dist. Six

Miles Cong. Dis!. Seven

Miles Cong. Dist. Eight

Miles Cong. Dist. Nine

Miles Cong. Dis!. Ten

Miles Cong. Dis!. Eleven

Miles Cong. Dist. Twelve

Total Miles

4 lO ...... 50
"<D" 4 23 6 27 5 12 4 4 4
160

Bituminous Concrete___________ --------- --------- -----

Bituminous Macadam _________

1.075 --------- --------- ---

8 225

3430 9 390

----------11.294

11.655 21.759

Bituminous Surface Mix. Cement Concrete __ Chert ___________
Graded. ___ GraveL ______

33.953

.626 9.616
17 456 19.262

15.920
6 916 10.849

--- - - - - - - - - -
19.931 11.860 6.643

28 530

8. 707 6.449

3414
6.433 22.494 1.969

20.540 28.613

5 000 20 .275 21.305 3.363

31.152 1.620

29 .543 9.498
--- --------17.446 18 .466 11.160

38.583 179.388 27.738 153.611 49.689

Lime-rock. surface treated _____ Macadam ___________
Resurfaced ___ ---------------Sand-clay ____ -------------Sheet asphalt._

7.924 12 .391
[~9 7.635 85;

3.672

8.740

12.041 16 878
----- ---- ---

3 350

35485 14 166

1.118 75 .386 54 901

--------- --------- ---------

20.399 17.555

6.592

----- -------

163 761 35.485 81.088 17.899 29.853

Surface treatment

-- ---- ----

8.022 6 653 4 797

19.472

Top-soil

----- -- ---- ------

----

------ -------- 16.018

4.482

20 500

---

--- -----

----- -----

- - - - - ~---

---

---- -----

Totals All Types

33 953 85.812 53.711 52.133 20.600 33 840 59.413 76.543 119.067 49.761 165.228 100 .420 850.481

State Route No.2. Proj. G-1-40, Gordon County, between Jasper and Fairmount

STATE HIGHWAY BOARD OF GEORGIA

PROJECTS PLACED UNDER CONSTRUCTION, SHOWING COUNTIES, MILEAGE, TYPES-BY ENGINEERING DIVISIONSFISCAL YEAR ENDING JUNE 30, 1932

_ _ _- _ - - - 7~---c---

DIVISION ONE

Project Number

County

Graded Sand-clay
and Top-soil

Gravel and Chert

Macadam Base and
W.B. Macadam

Surface Treatment

Lime-rock Surface Treated

Bituminou8 Surface Mixture

Bituminous Macadam

Bituminous Concrete

Bituminous
Concrete Rigid Base

Cem0r.t
Concrete

Resurflced

24 __ _ 34 ___ _
36 __ _
>-'54_ ___ _
~54_--
85__ 86 ______ _
87_ 115-A__ _ 115-B __ _
120 -178 248-B_ 252-A ___ _ 252-B __ _
289 424-A __
587 696-B_ 785-A_ 785-B

___ Cherokee__
___ Haralson---- __ Douglas _____ _ ___ Floyd ____ _
___ B'loyd _Haralson_
___ Haralson _ Haralson __ Chattooga Chattooga __ Carroll _ _Murray_ CarrolL_ Cherokee _Cherokee_
___ Carroll __ Polk ______ _
___ Whitfield Murray_____ _
Whitfield_ Whitfield_

4 040 5 .6EO
284 4.726

Project Number

STAfE HIGHWAY BOARD OF GEORGIA

PROJECTS PLACED UNDER CONSTRUCliON, SHOWING COUNTIES, MILEAGE, TYPES-BY ENGINEERING DIVISIONSFISCAL YEAR ENDING JUNE 30, 1932

----~-

County

Graded Sand-cl1y
and Tcp-soil

Gravrl and Chert

DIVISION ONE-Continued.

Macadam Base and
W. B. Macadam

Surface Treatment

Lime-rock Surface Treated

Bituminous Surface Mixture

Bituminous Macadam

Bituminous Concrete

Bituminous Concrete Rigid Base

Cement Concrete

Resur .. faced

805-E __________ Chattoogd

806-C_

_Whitfield

839.

Bartow_

:p: 900-D904-C_ ~':> 986-B.

_____ Walker_ Polk___ _
___ Pickens

986-C_ ______ Gordon

987__

__ Cobb_

988-A.

__ Floyd_

988-E ______ Floyd_ 991-C __ ____ Chattooga _____ _

1055------- ___ Fulton_

1092.-

Fulton_

TOTALS---

+ L_~ J_~
!

4.696 3.427 -1 15.207

5.178

4.969

5.362 I 320

16.822

- ------------~
---~;;-1

I 500 1.500

123
7.300 50 028

1700

STATE HIGHWAY BOARD OF GEORGIA 1932
DIVISION ONE

SUMMARY
7 Project Graded- Sand Clay- Top SoiL ___ _______ ______ _ 4 Chert and GraveL ___ ______ ______ _____ __ ____ ____ ___ ___ 4 Bituminous Surface Mixture __ ______ ___ ___ __ ________ _ 3 Bituminous Macadam __ _____ __ _____ __ __ __ __ ___ ______ _ 2 Bituminous Concrete______ __ ________ ___ ______ _____ ___ 1 Bituminous Concrete Rigid Base _________ -- - -- -- - - - __ 112 ICteesmuernfatcCedon__c_r_e_te_____ ________ ______________________________________ ________________________

34

Total____ ___ __ ___ ________ _______ ___ ___ ___ ____ __ ___

26.664 25.728 15.267 16.822 6.682 1.500 50.028 1.700
144.391

Vista of Mountains on a Turn in the Road Between Ellijay and Blue Ridge in Gilmer County, State Route No. 5
143

Proj . 442. Seminole County, Sheet A."phalt on Gravel Base

STATE HIGHWAY BOARD OF GEORGIA PROJECTS PLACED UNDER CONSTRUCTION FOR FISCAL YEAR ENDING JUNE 30, 1932
DIVISION TWO

--~-------~

Project !'.umber

County

Graded

Gravel Macadam

Bituminous

Bituminous

Sand-clay

and

Base and Surface

Sheet

Surface Bituminous Concrete

Cement

Resur

1 op-soil

Chert W. B. Mac. Treatment Asphalt

Mixture Macadam Rigid Base Concrete

faced

- - - - -~---- - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------~-[----[-----

22-23 48 _________ _

Walton _______ _ Milton_______ _ Forsyth _____ _ Clarke_______ _

2 000

9 996 11 310

3.350

61 -----------
1!7__. _______ _

Wilkes ___ _ Gwinnett. ________ _

4.000

7 996

,_. 126-B.. _______ _ Madison.
5'; 128-B_ ------- - Barrow..
162-- ----------- Gwinnett. __ 179-B _________ _ Greene ______ _
222-A.--------- Stephens. ___ _ 222-B _________ _ Stephens ___ _

ll.04l

247------------- DeKalb .. _

253-B_ ________ _ Oconee....

274-A__________ _ Stephens.

274-D----------- Stephens______________

.769

293-------------- Wilkes____________ - ----------

332_____________ _ White __ _

5.000

9.478 1.063
1.135 3273
3.095 3.089
10 .ll5

6.170 1.300

35L ______ _ 360-0 ___ _

Franklin. ___ _

4.159

Taliaferro _______________________________________________ ------------

5.800

372-A_ ___ _

Elbert.----------

3.751

376-A__________ _ Oconee.. ___ ---------

378.------------ 402-A------ ____ _

Taliaferro. __ Franklin __________________________________________________

------------

________________________

6.830 ------------------------

.496 2.837

Project Number

County

402-0 ..... .

Franklin.. _

407-A.... .

Rockdale ..

434-B ..... .

Clarke

444-K ..

Morgan.

459-K.

Gwinnett.

483-A.. .

Madison.

>--' 483-0 ... .
:j; 483-F. __

Madison Clarke _

681

Jackson ..

778

Oconee_

800-K ..

Morgan.

857-E

DeKalb ...

857-E- --

Gwinnett

984...

Union.

984-A___

Union __

1043-B_ _

White.

1044..

Lincoln

lOCO._

DeKalb. __ _

1066..

Elbert_

1073

Greene ___ ..

1077...___

Elbert. ___ _

1084... __________ Taliaferro ..

TOTALS ...

STAlE HIGHWAY BOARD OF GEORGIA PROJECTS PLACED UNDER CONSTRUCTION FOR FISCAL YEAR ENDING JUNE 30, H32
DIVISION TWO-Continued.

Graded Sand-clay Top-soil
286 6 372 6.177
6 eos
.760 3 027
10 583 7 549

Grav1 and Chert

M1cadam Base and W. B. M1c.

Surface Treatment

.022

Sheet Asph1lt

Bituminous Surface Mixture

Bituminous Macadam

Bituminous Concrete Rigid Base

Cement Concrete
2 372

8 793 325

4 880 5 400

------------..

I

086 .70)

Resurfaced
g 000
13 8fi9

559

65 .954

21.306

10 280

10.377

4.00

8.877

12 630

41685

SUMMARY OF ROAD TYPE MILES DIVISION TWO 15 Projects Graded, Sand-clay, and Tov-soil----- -- -- -------------------- ---- -- ---- ----- -- 65 .954 Miles 2 Projects Chert------------------ ---------------------- --- --- --- ----- ----- -____ -------- -- --- 21.306 Miles 2 Projects Macadam. ... __ _--- ------ ----------------- ----- ------ --------------------------- - 10 .280 Miles 3 Projects Surface Treatment.. . ______ ----- --------- -- ___ ------ --- --- ----------- -------- --- 10 .377 Miles 1 Project Sheet Ast>ha1t---- ------------ --------------------- -- ------------------ -------- --- 4. 000 Miles 2 Projects Bituminous Surface Mixture------ ----- ----- ------------ ---- ------- ------- --- -- 8.877 Miles 2 Projects Bit uminous Macadam------------ ------------- ------------------ ---- --------- --- 12.630 Miles 13 Projects Concrete.. _____ ___ __ ___ _______ ----------------------- ----------------- ____ ------- 38 .069 Miles 6 Projects Resurfaced. _____ ----- -- ---------- --------- -_- ---------- ---- --- _____----------- __ 41.685 Miles 46 Projects. . . ___ ________ _____ _____ ____ ___ ___ __--- ------ __ _____ --------------______ ------- ... . 213 .178 Miles
Coastal Highway_at Darien

S. A. P. 1015-B. Thomas, 1932, Route No. 35, Thomasville-Moultrie Grading by County Forces
Paving Proj . 112, Laurens 148

STATE HIGHWAY BOARD OF GEOF<GIA PPOJECTS PLACED UNDER CONSTRUCTION FISCAL YEAR ENDING JUNE 30, 1932
DIVISION THREE

Graded

Gravel Mac. Base

Lime-rock Bituminous

Project Number

County

Sand-clay

and

and W. B. Surface

Surface

Surface Bituminous Bituminous Cement

Resur-

and Top-sell Chert

Macadam Treatment Treated

Mixture Macadam Concrete Concrete

faced

-------- - - - - - - - - - - - - - - ----~- - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - - - -

93... ____ -------- Taylor..

144-A______ _ Peach

144-C .. _______ _ Peach

183-A _____ _

Peach.

.906 3 593 4 924

1.332

184..... -- ------ ~ Musco gee~ 259-B __________ _ Pike ... _

8 707

4.700

268 ..

Upson

..... 346... __________ _ Upson __

~ 39Q-C _________ _ Upson

2 976 2.962

5.619

39G-D -------- Crawford. 393-B _________ _ Taylor

4.73-l

10 586

393-C .. .

Ta"lor

7 167

393-D .. .

Taylor

10 ~586

393-E __

Taylor..

3 ~ 273

443-D

Jasper ..

731

445-F --------- Taylor__ 485-A__________ _ Chattahoochee... 58Q-A ______ _ Butts________

3 .461 1.531

6 692

589-B . . . . .

Bibb ____ L

2~343

679-A _____ _

Jasper.. ______________ -----------

679-B __________ _ Jasper.. _______________________ _

685..... .

Henry_______ ___________________ _

788 ....

Heard ___ ___________ 2~160

3 000

2 746

11.805

853-A. .

Coweta ..

2 ~000

941-B ...

Pulaski. ______________ _

.853

STATE HIGHWAY BOARD OF GEORGIA PROJECTS PLACED UNDER CONSTRUCTION FISCAL YEAR ENDING JUNE 30, 1932
DIVISION THREE-Continued.

Graded

Gravel Mac. Base

Lime-rock Bituminous

Project Number

County

Sand-clay

and

and W. B. Surface

Surface

Surface

and Top-soil Chert

Macadam Treatment Treated

Mixture

950-D

l:::: :~~~-~-~-~~~~

---~~-~---- -----~--~~

95Q-K

97Q-C_

Monroe__

.999

973-A _____ _

Henry __

973-A_________ _ Henry ____ _

.850

973-A _____ _

Henry ____ _

,_. 978-A _________ _ Jasper.---------------

g 1021

Marion _____________ _

3.734 3.409

1025-A_________ _ Pulaski ___ ----------- 3.998

1025-B_________ _ Houston

.349

1065--

Schley_________ _

3 189

Bituminous M1cadam

Bituminou~ Cement

Concrete

Ccn~rete

-.,--- ---

llesurflced

1--1--

.86J

.195

TOTALS __

68.675

3477

34.731

4 700

SUMMARY OF ROAD TYPE MILES

22 Projects Graded. Sand-clay or Top-soiL--------------------------- __________________ 68.675 Miles

3 Projects Lime-rock. Surface Treated------------------------------- -----------

19.085 Miles

1 Project Bituminous Surface Mixture______________________________________ ____________ 3.000 Miles

2 Projects Bituminous Concrete_______________________________________________ ____________ 3.477 Miles

7 Projects Cement Concrete_____________________

----------------------------------- 34.731 Miles

1 Project Resurfaced Concrete _----------------------------------------------------------- 4.700 Miles

36 Projects __

___________________________ . ______________________________ 133 .668 Miles

Proj. 347-A. Terrell County, Route No. 66, Dawson-Richland Road Surface Treated Lime Rock, Sept. 1932
G-4.-99, Burke 151

STATE HIGHWAY BOARD OF GEORGIA PROJECTS PLACED UNDER CONSTRUCTION FISCAL YEAR ENDING JUNE 30, 1932
DIVISION FOUR
- - -~~--------~=---- ~===

Project Number

County

Graded Gravel Mac. Base

Lime-rock Bituminous

Bit. Cone.

Sand-clay or

or

Surface Surface

Surface Bituminous Sheet

Rigid

Cement

Resur-

and

Chert

W.B. Treatment Jreated

Mixture Macadam Mphalt

Base

Concrete

faced

Top-soli

Macadam

- - - ~~-

~~-- -~~- -~-- - - - - - 1 - - - - 1 - - - - - - - - - - - - - - - -

25............ Candler. ....... -------------------- ---------- 6.778

112-------------- Laurens........... ---------- ---------- ......... ---------- ------------ ------------ ------------ ------------ ............

.79g ------------

112-------------- Laurens___________ .770 ---------- ---------- ---------- ------------ ____________ ------------ ------------ ----------- ------------ ------------

170-B..... ---- McDuffie......... ---------- __________ ---------- __________ ------------ ____________ ----------------------------------

.2og ------------

172-A___________ Baldwin __________ .................... --------------------

.665 ------------ ------------ ------------ ---------- ....................

172-B........ Baldwin .................. ---------- .......... ......... 9.109 ____________ ------------ ........... ------------ ------------ ...........

...... 207-A........ Effingham ................. ---------- ---------- ---------- ------------ ____________ ............ ------------ ------------

.795 ------------

R:; 207-B........... Effingham ....... -------------------- _________ ---------------------- ____________ ------------ ------------ ------------ 1.ll9 ------------

235.............. Candler. ........ ---------- __________ __________ 3.170 -----------. ____________ ------------ ........... ------------ ----------- ------------

241-A........... Hancock.......... 12.627 ---------- __________ ---------- ____________

______ -------- ....................... ------------ ------------

241-B .......... Baldwin.......... 6.385 -------------------- .......... ------------ ________________________ ------------ ------------------------ -----------2g5______________ McDuffie.......... .307 ---------- ......... __________ ------------ ____________________________________ ------------ ------------ ------------

302.............. Richmond ........ ---------------------------------------------------- ____________ ---------- ___________ ------------

.420 ........... .

366........... Bullock.......... -------- ---------- ---------- ---------- ------------ ____________ ------------ ------------ ------------ 7.785 ------------

387-D....... ---- Burke ........ --------------------------------------------------- __________ . ------------ 4.000 ------------ ----------- ......... 409-C........... Putnam........... 1.920 ---------- ---------- ---------- ------------ _______________________ ------------ ------------ ------------ ........... .

409-D ......... Putnam........... 1.323 ---------- ---------- ---

-------- ---------- . ------------ ------------ ------------ ------------ ........... .

451. ............. EmanueL ......... ---------------------------------------------------__

------------ 5.000 ------------ ------------ ------------

470-A....... ---- Laurens.............................. ____________________ ----------------------- ________________________ ........... 10.038 ------------

470-B.......... Laurens........... ---------- ---------- ---------- ---------- ------------ ------------ ----------- ------------ ------------

.563 ------------

470-C........ Wilkinson......... 10.902 ................. --------- ------------ ____________ ------------ ------------ ---------- --------- ------------

471-A........ McDuffie.................... ------ ---------- .......... ------------ ____________ ------------ ----------- ------------ 4.482 .........

473-B ...... Jefferson-Wash-

ington ................. ---------- ---------- ---------- 24 620

STATE HIGHWAY BOARD OF GEORGIA PROJECTS PLACED UNDER CONSTRUCTION FISCAL YEAR ENDING JUNE 30, 1932
DIVISION FOUR-Continued.

Project Number

County

Graded Sand-clay
and Top-soil

Gravel or
Chert

Mac. Base

or

Surface

W.B. Treatment

Macadam

Lime-rock Surface Treated

Bitummous Surface Bituminous Mixture Macadam

Sheet Asphalt

Bit. Cone. Rigid Base

Cement Concrete

Resurfaced

578-B __________ Jenkins __________ _ 1.575 582-A___________ McDuffie _________ _ 3.030

594-------------- Burke_----------- 10.442 640-------------- Screven____________ 9.565 __________ __________ __________ ____________ ____________

_______________________________________________ _

756-------------- Baldwin.

---------- _ ------- __________ __________ ____________ ________ ___

______ ------------ ____________ ----------- 8.000

772-A ___________ McDuffie --------- ____ _____ __________ __________ __________ ____________ ____________ ____________ ____________ ____________

.638 ----------

~ 823 ------------EmanueL ________ . 3.271 _______________________________________________________________________________________________________________ _

CN 824-------------- Dodge____________ ----------

__________ __________ 14.697 ________________________________________________ ------------ ------------

833______________ Effingham________ 1.728 __________ ---------- __________________________________ ------------ ___________________________________ ------------

861-A ___________ Jefferson

7.428 _______________________________________________________ ------------ ________________________ ------------

928. ------------ Screven 930-0 ___________ Bullock

______________________________ ------------ ------------ 6.344 ____________________________________ -----------__________ __________ __________ ____________ ____________ ____________ __________ _ ____________ 1.616 ------------

939-A___________ Wilkinson_________ 3.000 __________________________________________________________________________________________ ------------ ------------

944-------------- Bleckley___________ 9.300 ______________________________________________________ ------------ ________________________ ------------ ------------

944-0 ___________ Dodge__

2.114 __________ ___ ______ __________ ____________ ____________ _

________________________ ------------ ------------

955______________ Putnam____________

---------- __________ 7.000 ____________ ------------ ____________ _______ ______________ ------------ ------------

966-0 ___________ Burke._________ __ __________ __________ __________ __________

.755

______________________________________________________ ------------

1010------------- Washington ___ 1080 ------------Bullock

________ ---------- ________ _ __________

.614 ____________ ____________

_ ____________ ------------ ------------

3.672

__________ _ ________ ____

______________________________________________ ------------ ------------

TOTALS ___ ----------

81.931

7.428

16.948 50.460

6 S44

9.000

28.464

8.000

SUMMARY OF ROAD TYPES AND MILES
17 Projects Graded, Sand-clay and ToD-solL------- --------------- ----------------------- 81 .931 Miles 1 Project GraveL- ----------- --------------------- --- ---------- ------------------------------ 7.428 Miles 3 ProJects Surface Treatment-------------------------------------------------------------- 16 .948 Miles 6 ProJects Lime-rock. Surface Treated--- ----- ---- -------------------------- -- ------------ 50.460 Miles 1 Project Bituminous Macadam-- --- ---- ------- ---------------- --------------------------- 6.344 Miles 2 ProJects Sheet Asphalt---- --------------- -------------- ---------------------------------- 9.000 Miles 11 ProJects Cement Concrete-------- ------------ ----------------------- -------- ---------- --- 28.464 Miles 1 ProJect Resurfaced- -- --------------- ----- ---------------------- ------------------------ __ 8.000 Miles 42 ProJects-______ ___________________________________________ ___ ___ __ __ ___ ___________ ___ __ ____208 .575 Miles
296-C McDuffie, Grading

Proj. 408-C, Stewart County, Route No.1, Lumpkin-Cusseta Road, Cone. Paving, Sept., 1932

S. A. P. 1015-B, Thomas County, Route No. 35, Thomasville-Moultrie, Grading by County Forces, 1932

=-~~~---~--

STATE HIGHWAY BOARD OF GEORGIA PROJECTS PLACED UNDER CONSTRUCTION FISCAL YEAR ENDING JUNE 30, 1932
DIVISION FIVE

Project Number

County

Graded Sand-clay
and Top-soil

Gravel or
Chert

Mac. Base

Lime-rock

and W. B. Surface Surface

Macadam Treatment Treated

Bituminous Surface Bituminous Mixture Macadam

Brick

Bituminous Cement Concrete Concrete

Resur .. faced

88-A___________ Brooks.

100-D __________ TerrelL_

107-B- _________ Worth __ _

196-B . .

__ Early___ _

208-B _____ _ 264__. _____ _

TerrelL--. Early___ _

4510 2.430

267-A---...... 282---~ 282------
325 _____ _

_Stewart.
Lowndes
Lowndes Decatur_____ _

3 000

325-B __ _ 347-A __

GradY----TerrelL ___________ ------

375-B_ __

Mitchell

379-B-

ColQUitt-

408-0.43()-0_ 467-A __
474-B-. 48()-B __ _

Stewart._
TerrelL--- MitchelL__ Grady ___ _
__ Seminole _

485-B-.

_Stewart-

485-C _

Stewart_

487-A_________ ColQUitt-

~-

J [~1 ... ~~~7:' 7676

3.noo

11.593

8 927 .945

.589 4.000

4 610 12.410

.626 .449

7 220 2.000

8 779

.897

-----

-----

7 -0~5 9.154

13.368

----__ . ---

4.669 ~ .181 4.765 4.862 7 051

---------------------------------------------------

STATE HIGHWAY BOARD OF GEORGIA PROJECTS PLACED UNDER CONSTRUCTION FISCAL YEAR ENDING JUNE 30, 1932
DIVISION FIVE-Continued.

Project Number

County

Graded Sand-clay
and

Gravel or
Chert

M1c. Base

Lime-rock

and W. B. Surface Surface

Macadam Treatment Treated

Bituminous Surface Bituminous Mixture M1cadam

Brick

Bituminou~
Concrete

Cement Concrete

Resurfaced

Top-soil -----1-~------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - .. - - - - - - - - - - -

~~~~=~:::::::::: ~~~~~~~~-~::::::: : ~~~ _.:__.-_.:_:_:_:_:_:_ :_._:_:_:_:_:_:_:__-1 :::::::::::.

............ ....... ....

:

1017..

.. .. Berrien............ 6.000

1017-A......... Cook.....

7.204

.... ..........

..I,..

1018-B. .. .. Berrien.......... 11.565

.......... ..

. ..

1032-A.......... Tift.............. 2 818

...

1034-A......... Sumter........... 11.820

._. 1059

. Seminole.......

~ 1063 ............ Berrien............ 13 COO

1.075

I

...

1075 ............ Early.............. .667

1094 _ .......... Dougherty..

.....

. I ....

.... . . .

5.QOO -~ ..

TOTALS..

. .... -;-:;;-1 ~-;~-~~=---j 17020

~~~;--i-

1.523--1.~;-~-;~;-.

-:;-0~;--

- ----~---- - -

57 744

9 220

SUMMA.-lY OF ROAD TYPES AND Ml LE"-GE
14 Projects Graded, Sand-clay and Top-soiL .. . 1 Project GraveL............................. 2 Projects Surface Treated.......... . 4 Projects Lime-rock Surface Treated.. 2 Pojects Bituminous Surface Mixture .. 1 Project Bituminous Macadam.. 1 Project Brick.............. .. 1 Project Bituminous Concrete.. 9 Projects Cement Concrete 2 Projects Resurfaced

85 467 Miles .. . 11.593 Miles
17.020 Miles 19.100 Miles 1.523 Miles 1 075 Miles 5.000 Miles 4 000 Miles 57 744 Miles ..... 9.220 Miles

37 Projects All Types ...

.. .. 211.742 Miles

Proj. No. 474-A, 1931, Thomas County, Thomasville-Cairo Road, Route No. 33, Graded Road

STATE HIGHWAY BOARD OF GEORGIA PROJECTS PLACED UNDER CONSTRUCTION FISCAL YEAR ENDING JUNE 30, 1932
DIVISION SIX

Graded

Gravel Mac. Base

Lime-rock Bituminous

Project Number

County

Sand-clay

or

or W. B. Surface

Surface

Surface Biturr.inous Bituminous Cement

Resur-

and Top-soil Chert

Macadam Treated

Treated

Mixture Macadam Concrete Concrete

faced

~--~-- ~--~~--~ --~- --~~ - - - - - - - ---~ - - - - ---~- - - - - - - 1 - - - - - 1 - - - - - -

5---------------- Bacon ________________ ------------ ------------ ------------ ------------ 7.973 52______________ Evans_________________ 10.311 ------------------------------------ _
77 _______________ Charlton _____________ ------------ ________________________ ------------ ____________ ------------ ------------ ------------ ------------ 19.310 145______________ Montgomery _________________________________________________________________________________ ------------ ____________ 11.736 ------------

157-------------- Pierce. ___________________________ ------------ ____________ ------------ 7.196 ----------- ------------ ------------ ------------------------

177_________

Bryan______

________________________________________________ ------------ ____________ ____________ 14.549 ------------ ------------

,_. 226-A___________ Liberty________________ 5.000 ------------ ------------ ------------ ------------ ------------ ------------ ------------ ------------ ------------

256-A----------- Appling_______________ 3.789 ------------ ___

------------ ------------ ------------ ------------ ------------ ------------ ------------

309 ______________ Wayne_________________ 3.000 ------------ ------------ ------------ -------------

------------ ------------ ------------ ------------

322-A ___________ Pierce _____________ -- ---------- - ------------ ------------ ------------ 3.576 ------------ ------------ ------------ ------------ ------------

333-------------- Bryan ________________ ------------ ------------ ---------- ________________________ ---------- - ------------ ____________ 5.471 ------------

339. ____________ Pierce. ------------ -- ------------ ------------ ------------ ------------ 2.441 ------------ ------------ ------------ ------------ -----------369-A ___________ Toombs._------------- ------------ ------------ ____________ ------------ ------------ ------------ ------------ ------------ 1.298 -----------369-A___________ Toombs.-------------- 2.325 ------------ ____________ ------------ ------------ _ ------- ------------ ------------ ------------ ------------

41(}-A ___________ Ware-----------------------------------------------------------------432-C ___________ Glynn_________________ -----------------------------------------------476-A ___________ Jeff Davis. ________________________ ------------------------_____________

3.476 2.770

------- ------------ ------------ ------------ -------------------- ------------ ------------ ------------ -----------4.977 ____________ ------------ ------------ ------------

478-A ___________ Long________

7.255 ------------ _____

------------ ------------ ------ --------------- ------------------------------------

478-B___

Liberty_

591-A---------- Bryan_________________

6.791 ------------ ------------ ------------ ------------ --- -------- ------------ ------------ ------------ -----------1.136 ------------ ____________ ------------ ------------ ------------ ------------ ----------- ------- -----------

828-A__________ Wheeler. __ ------------ 1.828 ----------- ------------ ------------ ------------ ----------- ------------ ------------ ------------ -----------

832-A ___________ Jeff Davis. ____________ ------------ ------------ ------------ ------------ ------------

.662 ------------ ------------ ----------- -----------

862-A___________ Tattnall -------------905-D.---------- Clinch_________________

4.170 ------------ ------------ ------------ ------------ -------- --- ------------ ------------ ------------ -----------.312 ------------ ------------ ------------ ------------ ------------ ------------ ----------- ------------ ----------

STATE HIGHWAY BOARD OF GEORGIA PROJECTS PLACED UNDER CONSTRUCTION FISCAL YEAR ENDING JUNE 30, 1932
DIVISION SIX-Continued.

Project Number

County

Graded Sand-clay and Top-oil

Gravel or
Chert

Mac. Base or W. B. Macadam

Surface Treated

Lime-rock Surface Treated

Bituminous
Surface Mixture

Bituminous Macadam

Bituminous Concrete

Cement Concrete

Resur-
faced

908-A___________ Coffee__ _

908-B.-908-E--------919-B. _______ _ 1053-A ___ _

Coffee_____ _ Coffee_______ _
Chatham.-Lanier

TOTALS

10.642 56 559

3.739 2. 999

1.724

34.170

7.363

2.000 16 549

18.505

19 310

SUMMARY OF ROAD TYPES AND MILEAGE

12 Projects Grading___ ____ ---------------------------------------8 Projects Lime-rock Surface Treated ... ------------------------- ___ _ 3 Projects Bituminous Surface Mixture __ -----------------2 Projects Bituminous Concrete ____________________________________ _ 3 Projects Cement Concrete___________________________________________ _
I Project Resurfaced---------------------- ____________________________ _

. 56 .559 Miles 34.170 Miles 7.363 Miles 16 549 Miles 18 505 Miles 19 310 Miles

29 Projects All Types .. ____________________________________________________________________ .. 152 .456 Miles

STATE HIGHWAY BOARD OF GEORGIA TYPES AND MILEAGE OF ROADS PLACED UNDER CONSTRUCTION BY ENGINEEniNG DIVISIONS FISCAL YEA:i 1932
RECAPITULATION

Number

of

Type of Road

Projects
--~--- - - - - - - - - - - - - - - - - - -

Bitummous Concrete __________

Bituminous Concrete (Rigid Basel

Bituminous Macadam_

12 Bituminous Suface Mixture Brick ____

55 Cement Concrete __

fm-'

N

77

Chert___ Grading

2 Gravel __

21 LimE-rock Surface Treatment.

2 Macadam_

12 Resurfacing

1 Sand-clay _

3 Sheet Asphalt

8 Surface Treatment __

9 Top-soiL
-------- ~--- - - - - - - - -

224

TOTALS

Miles Division
One
6 .6S2 !cOO 16 .8?2 15.267 50 C28 23 728 22 308
-I 1H 391

Miles Division
Two
12.630 8.877
38 019 21306 39 .2-!8
10 20 41685 6 .60~i
4 oco
10.377 20 .098
213 178

Miles D1visicn Three
3 477
3 000 31 731 65.333 1!J Q3.j
! 700
3 3-!2 133 66R

Miles Division
Four
6 341
:?3 .464 67 -llli
7.423 PO .Jell 8 .GCO 9 .GO:) 16 918 1! 515 208 57:)

Placed Under Construction Fiscal Year Ending June 30, 1931. All Types and Divisions (228 Projects1_-

Milee Divisian
Five

M1les
Di'.il~ion
SIX

Total I'. II
Divisions

l.U7J 1 E2-3
i). ~;on
;)7 .7 4-1
8i) . .J-i:7 ll ;:g:i 19 .11iC
9.220
17 020
--Ii
211 74'!

30.708

1.500

36.871

36 .030

5.000

227.541

47.034

336 331

19 021

122.815

10 280

84.615

6.608

13 .000

44.345

436-~1 42 311

----------

1-2

l. 03-10111

____ 1. 2RH 013 Miles.

Proj. No. 405-A, 1931, Thomas County, Thomasville-Tallahassee Road, Route No.3, 20' Concrete Paving

Proj . 481-A. Coffee County, Sand-Asphalt Paving
Proj. 481-A. Coffee County, Sand-Asphalt Paving 16 !

STATE HIGHWAY BOARD OF GEORGIA
TYPES AND MILES OF ROAD PLACED UNDER CONSEUCTION BY CONGRESSIONAL DISTRICTS-FISCAL YEAR 1932 F.ECAPITULATION

No. of Proj.

Type of Road

Miles Gong. Dis!. One

Miles Cony. Dis!. Two

Miles Cony. Dis!. Three

MiiBS Gong. Dis!. Four

Miles Cony. Dis!. Five

Miles Gong. Dist.
Six

Miles Gong. Dist. Seven

Miles Miles Miles

Con~.

Con~.

Cony.

Dist.

Di3t.

Dist.

EiJht

Nine

Ten

------ ---- ----

Miles Miles

Cony. Gong. Total

Dis!.

Dis!.

Miles

Eleven Twelve

---- ----- ------

BitumL11ous Concrete

16. 5-!~i

-1 000

Bituminous Concrete !Rigid Base) ____________ _

1.5GO

Bituminous Concrete Macadam 6.3H

!2 Bituminous Sur. Mix

1 Brick__

I

55 Cement Concrete._

Chert

77 Grading _____ _

52 (J~()

2 GraveL

21 Lime-rock. surface treatment_

2 Macadam

12 Resurfacing __ _

Sand-clay_

Sheet Asphalt ________________ _

Surface Treatment._ Top-soiL._

----~~ 9.555 ~-~--;---~~~---1

224

Totals __

---- ll6.027

3.477 1 320

5 .J22

30 703

3 000

li.8:22 ___ _ R ./...~/-1-

J5 237 3 v

5 000

18 968 2.5 :23

2J. 123 2.5 432

14 2i8 21 c(JJ 18 4[:)

---- ill 2so !
28 035

8. 793

25 231 44 0.51 14.697
5 OJO

1 500 03.S71 3 i(l]()
5 OQO 22.7 .5H 47 034 333.331 19 C21 122.815 10 230 84 615
6 50S 13 0:10 44 34) 42 .31!

111.116 113.174 130 035 SJ .038 1034 010

Richmond County, Fifth St. Bridge, Augusta, over Savannah River

BRIDGE CONSTRUCTION
FISCAL YEAR 1931-32
During the past Fiscal Year the progress of bridge construction throughout the State has been very gratifying. Many new structures have been built and many structures have been widened to accommodate modern traffic.
Various design types were used including reinforced concrete, treated timber, cypress timber, structural steel, I beams and plate girders. On numerous occasions where the bridge site warranted a low cost structure without sacrificing strength or durability, a type of bridge was constructed consisting of treated timber pile substructure with I beam joists and concrete floor slab and rail. This type proved very economical and satisfactory.
In another section of this report a tabulation shows structures which have been completed and on which final estimates have been passed amounting to 79 bridges on 45 projects aggregating 2.117 miles, built at an approximate cost of $590,000.00.
In addition to the above, structures which have been completed hut final estimate not passed amount to 94 bridges on 45 projects, aggregating 2.498 miles with an estimated cost of $1,000,000.00. These arc carried as under construction until final estimates arc passed. (See notation below.)
Structures which were actually under construction and incomplete on June 30, 1932, amount to approximately 51 bridges on 31 projects aggregating 1.302 miles with an estimated cost of $350,000.00.
Cost of all completed bridge projects for which settlement has been made is included in Construction Expenditures of the Accounting Department. Bridges which have been completed but on which final settlement has not been closed are treated as being under construction, the same as bridges actually under construction. However, payments on both the latter are included in Construction Expenditures of the Accounting Department.
A FEW OF THE MAJOR PROJECTS COMPLETED AND UNDER CONSTRUCTION ARE DESCRIBED CONCISELY AS FOLLOWS:
COMPLETED
Project 138-B, Warren-Hancock Counties: This bridge is on Route 16 between Sparta and Warrenton over the Ogeechee River, described in annual report for 1931. Treated timber, I beams,
167

concrete floor, 460' long, 22' roadway. Approximate cost $20,000.00.
Project 220- D, Hall County: This project is on Route 11 between Gainesville and Cleveland, over the Chattahoochee River and Little River, described in annual report for 1931. Three bridges, reinforced concrete and structural steel truss, 20' and 24' roadway. Total length 952'. Approximate cost $71,000.00.
Project 296-C, Wilkes-McDuffie Counties: 'fhis bridge is on Route 10 between Washington and Thomson, over Little River, described in annual report for 1931. Total length 450', 22' roadway. Approximate cost $32,300.00.
Project 444-A&B, Oconee-Morgan Counties: These projects cover three bridges on Route 24 between Watkinsville and Madison, described in annual report for 1931. One bridge over Apalachee River, concrete cantilever 371' long and two concrete bridges totaling 614', 24' roadway. Approximate cost $72,000.00.
Project 126-C, Madison County: This bridge is on Route 8 between Athens and Danielsville over the South Broad River. Bridge is of reinforced concrete 278' long, 22' roadway. Replaces an old wooden latticed covered bridge. Approximate cost $22,000.00.
UNDER CONSTRUCTION
Project 302, Richmond County (Flood Relief 11). This is the west approach to the Sand Bar Ferry bridge on Route 52, near Augusta, over the Savannah River. The old approach was washed out during the 1929 flood and replaced with 1591 feet of long I beam spans with concrete floor on treated timber pile bents. Roadway 20'. Approximate cost $77,000.00.
Completed but final estimate not in.
Project 522-C, Richmond County. 'fhis bridge is on Route 4 at Fifth Street in Augusta, over the Savannah River, and replaces an old bridge consisting of light steel trusses on brick piers. 'fwo spans of the old bridge were washed out during the 1929 flood. The old piers were underpinned and retained, and a new superstructure consisting of steel plate girders, I beams and concrete floor was built with a 22 ft. roadway and two six foot sidewalks. Total length 1202'. Approximate cost $202,000.00.
Completed but final estimate not in.
Project Flood Relief 12 (522-C) Richmond County: This is an overflow bridge adjacent to Project 522-C. Consists of 1200' of reinforced concrete deck girders on concrete bents with a road way of 22'. Approximate cost $90,000.00. Two 5' side walks.
Completed but final estimate not in.
168

Project 5 Reop, Bacon County: This bridge is on Route 32 between Alma and Douglas over Little Hurricane Creek, consisting of 420' of treated timber pile trestle with I beams and concrete floor. Roadway 22'. Approximate cost $15,000.00.

Completed but final estimate not in.

Project Flood Relief 4 (322-A) Pierce-Vlayne Counties: This project consists of 4 bridges on route 38 between \Vaycross and Jesup over the Satilla River, aggregating 1440'. Substructure is of treated timber piles and superstructure of I beams with concrete floor, width of roadway 22'. A 100' steel truss span on concrete piers was raised, and retained. Approximate cost $52,000.00.

Completed but final estimate not in.

Project 24 Reop., Part 2, Cherokee County: This bridge is

on Route 5 near Canton, over the Etowah River. The main

river spans are cantilever I beams, concrete floor, 60'-90'---60'

spans, on concrete piers. The approach consists of treated timber

pile bents with I beam and concrete floor.

Total

length

855

1 ,

roadway 22'. Approximate cost $44,000.00.

Project S. A. 1077, Elbert-Wilkes Counties: This bridge is on Route 17 between Elberton and Washington, over the Broad River. The main river spans are cantile\er I beams, concrete floor, 65'-90'-65' spans on concrete piers. The approach consists of treated timber pile bents with I beams and concrete floor. Total length 901', width of roadway 22'. Approximate cost $38,000.00.

Project S. A. 591-A Bryan County: This project is on Route 30 near Clyde, and consists of four cypress timber bridges aggregating in length 1158',width of roadway 20'. Approximate cost $21,000.00.

DESIGN
The Bridge Department has completed designs for 120 bridge structures on 86 projects aggregating in length 5.239 miles. The estimated cost of the above is approximately $1,250,000.00.
Many preliminary layouts and studies have been made for structures anticipating future design. Standards covering all sizes of reinforced concrete culverts have been entirely re-designed and re-drafted.
The following tabulation indicates bridges completely designed during the fiscal year:

169

Length

Concrete Bridges .......... . . ............. 4376 lin. ft.

Structural Steel Bridges ...... .

. . . . . . . . 120 lin. ft.

Timber and I beam Bridges.

. ....... 23165 lin. ft.

Total .................. .

. ............ 27661 lin. ft. 5 239 miles

PAINT
During the year two :Maintenance Bridge Paint Crews lmYe been in operation, repainting steel bridges throughout the State. These crews began operations :May 25, 1931, and disbanded on account of weather conditions on January 13, 1932.
All painting was done by hand brush. One crew cleaned the structures by hand, while the other crew cleaned with sand blast equipment. The bridges were giYen either a full coat of red lead paint or a touch up coat of red lead paint followed by a finish coat of aluminum.
Both crews painted twenty-four bridges located in sixteen counties. The total length of bridges amounted to 4687 lin. feet, or 0.89 miles. In addition to this 1424 lin. feet of handrail was painted.
The following amounts of paint materials were used:
19,300 pounds 95% red lead paste 629 gallons linseed oil 28 gallons Japan dryer 34 gallons turpentine
1,670 gallons varnish vehicle for aluminum 3,083 pounds aluminum powder
Records were available showing weights of structural steel for fifteen bridges. For these ftfteen bridges the total cost of painting per ton per year ranged from $1.20 to $3.41, or an average of $1.92.
On April 4, 1932, these two Paint Crews were reorganized. Report as to their actiYities will be made in Annual Report for 1932-33.
The cost of operating the bridge paint crews will be found in the report of the Accounting Department.

170

S. A. P. 1016-B, Thomas County, Route No. 36, Thomasville-Moultrie, Bridge Over Big Creek, 1932

STATE HIGHWAY BOARD OF GEORGIA

NUMBER AND TYPE OF BRIDGES COMPLETED

FISCAL YEAR ENDING JUNE 30, 1932

DIVISION ONE

..

Miles

IVIiles.

i\'iiles

Wliles

Project No. of

Miles Concrete Timber Treated Timber

Miles

County

Number Bridges Concrete !-Beam !-Beam Timber Concrete Concrete Miles

Total

Cone. Floor I-Beam

Floor

Culverts Paving

Miles

-------- ------- -------

------

------- --"-

- -- ---- ----- -------- ----

Haralson._ Haralson... Carroll -----

...

34

87

. 120

1

.004

1

.005

2

.028

I

.004

I

.005

I

.028

Murray_ .. Gordon...
Totals.

_!l~----11-------- 1----- ..
----

806

, ,

I __

5I s

.o37

.328 .328

.006 I -

'

'

- - - - ---~-

----

I

.006

.328 .006
.371

lJIVl~IO:r.. '!'WO

Madison .. Madison. Newton .. Hart.. DeKalb_ Banks. Hart.. .. Oconee ___
Morgan .. Morgan Habersham

...
.. .
-
.. .
--.
---- ---

Madison. Greene.. _.
Banks ... Jackson. .

----... . ..

Totals .. ....

. .

126-0

1

.035

!

126-A

3

.052

153-D 231-A

1 2

I

.022 .024

... -1

247-A

1

352-0

1

.055

361-A

1

.014

444-A

1

.070

I

-

I

444-B

2

.116

444-0

1

.040 I

469

--

-----

483-B 964-D 979-A 983
15

1

.022

1

..

1

.017

..

1

...

------ ----- --- - - - - --- --

18

.357

.070

.040 I

.035

---- . . .

.052 .022

..

.010

..

.024 .010 .055

.014

...

.070

.116

.
. -.. -f .027 \

.040
.027 \ paving f

.
.014

. . -------
-

-- --
.009

.022 .014 .017 .009

-- -------

.033

.027

.527

Proj. 209, Tift County, Bridge Over Ty Ty Creek

STATE HIGHWAY BOARD OF GEORGIA

NUMBER AND TYPE OF BRIDGES COMPLETED

FISCAL YEAR ENDING JUNE 30, 1932

DIVISION THREE

County

Project Number

No. of Bridges

I Miles

CMoniclereste

I

Concrete 1-Beam

MTiUmb"er 1-Beam

Miles Treated Timber

Miles

Timber

Miles

Concrete Concrete

-
Miles

Total

I

I

I

leone. Floor 1-Beam I Floar I Culverts Paving I Miles

Harris_ Pulaski_

--

17

113

1

1

.027

I

.074

\ .074 .027

Pulaski _

------

475-A

1

--

Chattahoochee ___ --- 485

2

.038

Jasper_ ______ Totals_ --

-____5_1__ I -- 976-B

2

--

7- ----

------~-

I

.065

.030
.125
- -- - - -
.155

-

-- ---

-

.074

-- - --

.030 .038 .125
-~-
.294

DIVISION FOUR

Hancock_

138-B

1------

.087 ---c---

.087

,..... McDuffie_

170

1

.006

.006

~ Effingham__

207-B

4

.027

.027

Bulloch

229

2

.017

.017

Bulloch __

366

2

.011

.011

Laurens __ _

470-A

3

.014

.014

Richmond

472-A

3

.029

--~-~~-~- -- J--_I__ .303_1__ Burke__ _

472-B

2

.065

.065

Dodge __

.017

.017

Jefferson __

.170

.170

Totals 10 23 .065 - - - - - - - - - - - .443 -~~~~~~~~~~~~~~~~--~~~---.D~I'"V'""I;-;;S::-;;Ico;OC;;N;;;--c;F""I'"V~E~~~--~~~

-~~---

----~~

Grady __
Stewart_ Irwin_ Early __ _
Worth_ Quitman

152 408-0 912 917-B 1002-A 1006

3 I .045
2
5 1 6 1

-,I
!
.035
.075

.045

.037

.134

.035

.040

.040

.075

Totals_

6

18

.045

.110

.040

.366

State Route 24. Oconee-Morgan Counties, Bridge Over Apalachee River

STATE HIGHWAY BOARD OF GEORGIA NUMBER AND TYPE OF BRIDGES COMPLETED
FISCAL YEAR ENDING JUNE 30, 1932 DIVISION SIX

County

Project No. of Number Bridges

Telfair__

149

1

Brantley __

388-B

1

Brantley___ ----- ---- 388-F

1

Appling_

476

1

Coffee_

908

1

Montgomery ___

1049

1

-------

Totals __

6

6

Miles Miles Concrete Concrete !-Beam .004
-- ---------
----
.004

I MTiimlebser

Miles Treated

!-Beam Timber

Cone. Floor !-Beam

Miles Timber Concrete Floor

Miles Concrete Culverts

.012 .018 .031 .078
.139

-- ------
------------------
-- ----------
--------- --

FISCAL YEAR ENDING JUNE 30, 1932 BRIDGES, TYPES AND MILEAGE, COMPLETED BY ENGINEERING DIVISIONS

Number Number

of

of

Projects Bridges

Type of Structure

Miles Div. One

Miles Div. Two

Miles Div. Three

Miles Div. Four

Miles Div. Five

Miles Timber Repaired
.466
.466
Miles Div. Six

17

26

Concrete ___________________ --- .037

.357

.065

.065

.045

.004

1

1

Concrete !-beam__________ ---- ---- -----

.070

---- ----- --- ----

- ----

------ ---

14

22 Timber !-beam, cone. floor ____ .328

.040

.155

.303

.llO

.139

3

8

Timber concrete floor __ ---- -- -------- ---------

.074

---------

.171

. -------

10

22

Concrete culverts ______ ------ .006

.033

-----

.075

.040 -----------

45

79

Total constructed -------- .371

.500

.294

.443

.366

.143

1

1 Paving ____________ . __

- --- ---- .027

------

--- - -- ---- ------- -

1

1

Timber repairs__ ________ ---- - --- -- --------- ----

-- -- --- - ------ ----

.466

47

81

Total Constr. Paving and

Repairs _________ - - ---- .371

.527

.294

.443

.366

.609

Total Miles .004 .466 .012 .018 .031 .078
.609
Total Miles
.573 .070 1.075 .245 .154
2.117 .027 .466
2.610

Route 50. Dougherty County, Bridge over Piney Woods Creek

STATE HIGHWAY BOARD OF GEORGIA
BRIDGE TYPES AND MILEAGE COMPLETED BY CONG. DISTRICTS Fl SCAL YEAR ENDING JUNE 30. 1932

No. of Projects
17 1 14 3 10
45 1 1
47

No. of Bridges
26 1 22 8 22
79 1 1
81

Miles in Congressional Districts

Type of Structure

One

Two

Three

Four

Five ---- -



I

Totol

Six

Seven

Eight

Nine Ten Eleven Twelve

- - - - - - - - - ---~ - - - - - - - -----~- -~-

~-- ---~

Concrete ________ _

.035

045

-"I .033

009

.285 .072

Concrete !-beam._ Timber !-beam con. floor_ Timber cone. floor__ Concrete culverts ..

055

::Ill "'~__c"'~ .123

.328 003

.070

.040

.286

i .014 .009

.005

--- - - - - -

Total Constructed.

.120

120

112 .140 .010

343

.4091 OS1

.292

Paving_

.027 I

Timber repairs.

T~:~~i~~str:~avi~g and~--=~~.120

--- - ---- -----

1121 .140

.010

.1251

.3431

.409 .108

.292

1
031
.Oil .125 .134 --
.014

.573 .070 1.075 .245 .154

.195 .170 2.117

027

.466

.456

2.610

._...,..
<0
Route 17. Wilkes-Elbert Counties. Bridge Over Broad River

STATE HIGHWAY BOARD OF GEORGIA
BRIDGES AND CROSSINGS ON STATE SYSTEM AT JUNE 30, 1932

State Construction

Number

Concrete and steeL ________ _

517

Concrete culvert type ___ _

271

Treated timber or !-beams and

timber_ _________________ _

265

Untreated timber___ __ ___________ _ 29

Cypress timber____ ______________ _ 85

Grand

Lin. Total Total

Ft.

Ft. Miles

---

98,272

8,194 --------- -

68,901 2,723
18,999

Total above ____________ _

1167

---- 197,089

-----1----

R. R. Overpasses, concrete or steeL_

21 2,691

R. R. Overpasses, treated timber_____ 46 6,639

1----1-------------

Total Overpasses_ _______

67

9,330

1----/----1---------- .

R. R. Underpasses _______ _

9 not added length not

given

State Maintenance Timber _________ _

161

12,380

Total Structures by State.______ 1395

- 218,799= 41,439

County Construction

Timber

Concrete

__

Struct. Steel Trusses and Trestle

407 48,056 82 10,182
195 30,533

Total Structures by Counties__

684

---- 88,771= 16.813

Railroad Construction Overpasses, treated timber _ Overpasses, untreated timber_

21 2,371 16 1,505

Total R. R. Overpasses __ _

37

3,876= .734

Underpasses by R. R.'s__ _

44 not add ed lengt h not given

Total R. R. Structures

81

Grade Crossings _____ _

528

Fords ____ _

56

Ferries ____ _

9

Total Bridges and Other Cross-

ings_

2709

Bridges in larger cities not included

in above table ________________ _

-- 311,446= 58.986

Note: The foregoing total of Overpasses (104) and Underpasses (53)
does not take into consideration Grade Crossings eliminated by relocations.

180

Berrien County, Bridge Over Withlacoochee, Built by State Force
Route 16. Hancock-Warren, New Bridge Over Ogeechee at Jewell
181

STATE HIGHWAY BOARD OF GEORGIA
COMPARATIVE TABLE SHOWING TYPES AND MILES OF ROADS COMPLETED AND CLOSED FISCAL YEAR ENDING JUNE, 1931 AND JUNE, 1932

Completed

Completed

1931

1932

----,-------;-------;----

Type of Road

No. of

!No. of

Proj. Miles ' Proj. Miles

- --

--

I

Bituminous Concrete

I

Bituminous Concrete (rigid base) _____

Bituminous Macadam __

6 I 54.884

2

4.851

11 72.884

-- 3 11.655 --
4 21.759

Bituminous Surface Mixture_

6 28.541 10 38.583

Cement Concrete

I 31 163.772 50 179.388

Graded, sand-clay and top-soiL

44 246.270 31 192.010

Gravel and chert __

10 57.255 10 77.427

Lime-rock, surface treated

17 62.094 27 163.761

Macadam_

4 27.545

5 35.485

Resurfaced

14 79.203 12 81.088

Sheet Asphalt ___ _

4 29.853

Surface Treatment _

3 19.815

4 19.472

-----

----

Total roads completed

148 817.1141 160 850.481

Type of Bridge: Concrete Bridges and Culverts__ Steel Structures ____ _ Timber and !-Beam Bridges _
Total Bridges Completed

1931 2.005 miles
.031 miles ___ 1. 853 miles
3. 889 miles

1932 . 797 miles 1. 320 miles
2 .117 miles

Roads Placed Under Construction. All Types__________ ___________ ___

1931

1932

Proj. Miles Proj. Miles

__228 1,288.013 224 1,064.010

182

Route 1. Chattooga County, Grading and Chert Road over Taylor's Ridge
Route 6. Cherokee County, Grading of Canton. Note Ditch at Side 183

Bridge Over Coahulla Creek, Built by State Forces, Route 2, Whitfield County

STATE FORCES
"'I.Jl ConYict forces and "~sphalt Department hm'e been operated under the direct supcryision of L. B. Ackerman, Jr.
ASPHALT DEPARTMENT
During the entire ;.'ear three units equipped for a:;phalt paYing construction ha,e been operated on ,arious new construction and repair projects.
The following projects were completed during the fiscal year ending June 30, 1932:
NEW CONSTRUCTION

Div.l Project

County

Type

Miles

No.

No.

------ ---- ------

- --------------- ---

3 A-418 A&B _Monroe ___ 6" I"imerock surface treatment_ 6.87

2 .I\-434B ___ Clark _ __Testroadontopsoil_

__ 1.00

4 A-756_ __Baldwin__ _ 6" Limerock surface treatment_ 8.00

6 A-908 A&B __ Coffee__ __ 6" Limerock surface treatment__ 5.00

5 A-912 B_ ___ Irwin

_ 2" Penetration on pebble soil __ 11.30

3 A-938_______ Houston__ _ 8" Limerock surface treatment _ 4.50

3 A-945 A_____ Peach _____ 8" Limerock surface treatment__ 6.75

3 A-945 B_____ Peach _____ 6" Limerock surface treatment__ 3. 98

4 A-955 _. _____ Putnam _____ Surface treatment on chert___ 6. 00

5 A-442. _____ Seminole ____ Rebuild gravel base__

__ 9.16

5 A-325 B. ___ Grady__ _ __ Rebuild gravel base 1f' Mixed-

in-place __ _

4.61

4 A-360 ABC _ Taliaferro ____ Rebuild gravel base-surface

treatment__

_ 5.15

4 A-378 _______ Taliaferro ___ Rebuild gravel base -surface

treatment_______

_ 6.83

4 A-1084.. _ Taliaferro ___ Rebuild gravel base-Surface

5 A-1059 __

I

treatment_

________ _

lSeminole_ __ 2" Penetration ___ _

1.00 1.00

Project No.

RESURFACING PROJECTS

County

Type

Miles

G A-77 __

1Charlton __ Reseal and 1f' to 2" mixed-in-

place_

_ _

8.00

G A-77

_ Charlton

Retread-surface treatment ______ 11.31

6 A-212__

Ware

5 A-282 __ _ Lowndes

n" Retread-surfctce treatment__

3.00

Reseal-apply cold mix paving 7.22

3 A-380__ ___ Houston __ _ _Reseal __ _

.54

3 A-401 A&B Houston

ReseaL

8.00

3 A-436 B_ ____ Houston _ ReseaL __ _

6.40

2 A-459 ___ . Barrow_

_ ReseaL __

_________ . __

2.10

5 A-776 _____ ,Irwin_

Retread_

__ __

2.00

2 A-247

:DeKalb___ _ _[Retread-surface treatment _

1.30

2 A-407 A_ -!Rockdale__ Retread-surface treatment _

9.00

2 A-459 __ __, Gwinnett . -~'Retread-surface treatment__

13.00

2 A-117___ . !Gwinnett _ __ Retread-surface treatment__

8.90

2 A-162 _ _ Gwinnett _ Retread-surface treatment __

6.10

----------------

185

Pebble Soil Road Graded and Surfaced by State Forces, Route 11, Lanier County

PROJECTS UNDER CONSTRUCTION-JUNE 30, 19 NEW CONSTRUCTION

Div. Project

No.

No.

County

Type

Miles

---------. - --------------------------

4 A-25 A&B Candler

Rebuild base-surface treatment 6.78

4 A-235___ _Candler _ __ Rebuild base-surface treatment 3.17

5 A-375 A&B _Mitchell _ Rebuild base-surface treatment 12.41

l _A-805CD&E chattooga _]Rebuild base-H" cold mix. __

9.10

1

I

-

RESURFACING PROJECTS

2 A-6L_ 4 A-387 D

. Wilkes._ Burke_

Mixed-in-place and surface Treatment ___ _
IRetread-surface treatment_
I

4.00 4.00

CONVICT DEPARTMENT
'fhis department has functioned since July 1, 1930 under the present organization. This unit is made up of four main prison camps, consisting of a personnel of approximately 450 convicts. These camps are located in whitfield County, on State Route No. 71; Bartow County, on State Route ?--Jo. 61; Fannin County, on State Route No. 86; an<i Berrien County, on State Route No.
11.
The work done by these units consists principally of grading, though some bridge projects have been constructed very successfully and at moderate cost. All work is supervised by Engineers under the direction of the Division Engineer.
The following projects were completed during the period:

Div. Project

No.

No.

County

Type

Miles

.._ - - - -

5 A-947 A _____ Stewart ___ __ Grading and drainage __ ------ 10.84

5 A-947 B__ - Stewart __ --- Grading and drainage__________ 5.61

1 A-806 A&C__ Whitfield_ __ 3 bridges_ . __ ------------------ -- ---2 A-613. ___ _ Union___ ---- Grading and drainage __ . ----- 1.10

2 A-984 - .. - _Union____ __ Grading and bridges and water

bound macadam ________ ... __ 10.50

2 A-989___ _Fannin --- __ 4" stone macadam_

------

4.55

5 A-1017 B_ ___ Berrien___ __ Grading and 3 bridges_ ----- . - 5.00

187

Route 9-11. Lumpkin County. Cold Laid Surface on Mountain Highway

PROJECTS UNDER CONSTRUCTION JUNE 30, 193 2:

Div. P roject

No.

No.

Count y

Type

Mil es

1 1

A-785 A-839

Ac&__B_____BWahrittofwie_ld___________

Grading Grading

and and

d r a i n a g e __ drainage __

______ __ ________

14.50 13. 35

1 5

A-1023_____ _ Fannin___ ___ _ Grading and drainage __ . _. ___ __ A-1018__ ____ Berrien_______ Grading and bridges . ____ . ___ __

9.88 11 . 65

4 A-241 A&B__ Hancock _--- Grading and draining_ ------ -- 7. 30

F a nni n County. State Convict Camp, Mineral Bluff 189

View in Chemical Laboratory
Test on Steel Beam Carrying Concrete Slab. Laboratory 190

ANNUAL REPORT OF LABORATORY
JULY I, 1931, TO JUNE 30, 1932
Attached is a list of the samples tested and reported during this year. This list, howcve:-, docs not comprise the entire work of the laboratory. Development of specifications for many materials, such as paints, enamels, metal sheets for signs, grader blades, oils, greases, tars, emulsions, etc., has been an important part of tlie laboratory work. Promulgation of such specifications has resulted in better and more uniform materials, as well as a large saving in money. The development and adoption of a motor oil specification under which competitive bids are invited, has resulted in the use of a uniform product of high quality at a \'ery material sa\ing in price.
The laboratory is frequently engaged in investigation work; to determine the merits of new materials, and new methods; to determine the availabilitv of suitable local materials: and to explain causes of failure. ~
RESEARCH WORK
In addition to the general testing handled by the laboratory considerable work has been done by this staff on several research projects during the past two years. These projects have included the following:
Field tests on highway guard rails made during the spring of 1931 by actual impact between a truck, bus and toming cars with sections of guard rail. These tests have attracted national interest and have been very useful in working out details of guard rail and in comparing the merits of different types o1 material available. This project was reported to the Highway Research Board and the motion pictures taken in connection with the tests were shown in Washington at the meeting of the Highway Re3earch Board in December 1931.
Temperature effects on concrete deck girder bridge slabs have been studied. It has been found that the changes in temperatures are not uniform in the slab and girder sections. This lack of uniformity in temperature causes very appreciable vertical movement in the decks resulting in stresses which have not been taken into account in design. Further work along this line is in progress.
A type of construction very widely used in bridge work consists of a concrete floor slab supported by steel joists. The interaction between the concrete floor slab and steel joists has been the subject of another investigation. It has been found that the concrete slab works with the steel joists, and that the amount
191

the slab works with the steel joists is not dependent upon bond between the slab and the joists. The friction between the slab and the joists seems to be the determining factor. Data is being worked out on seyeral projects in the field and tests haYe been made in the laboratory in an eiiort to eYaluate the amount that the slab and beam wo;k together.

TOTAL SHIPMENTS-REPRESENTED

OR

SAMPLES

Cement Sand ___

4,912 982.400 bbl({t$.007 $

802

2.00

Coarse Aggregate ______

1,062

1.00

Asphalt Lime Rock ____ -Tar Asphalt Filler

1,474 541 180 32

2.00 3.00 3.00
.50

Reinforcing SteeL ____

33:1

1.00

Concrete Cylinders ___

4,884

.50

Concrete Cores_

1,401

5.00

Concrete Beams __ Concrete Pipe ___

431

2.00

206 38,294 Ft. .02

Corr. Metal Pipe_

72H

3.00

Expansion Joint_

38

2.00

Paint

-

Top SoiL ___

H4 1,344

6.00 .75

Timber_ __

55 711.422 EM .75M

Water Grease __

153

2.00

96

6.00

Sodium Silicate Asphalt Sand

28

2.00

94

l.OO

Creosote OiL Motor Oil Clay Pipe

3.00

86

G.OO

1

4.00

Sign Metal

:3

2.00

Road Oil

:2

Water Proofing MateriaL

l

Copper Flash_

1

3.00 5.00 3.00

Wire Cable_ -Fertilizer Center Strip_

2

1.00

lO

.40

4

1.00

---- - - - - - - - - - - - - - ------

Totals

18,984

Oil Inspection at Houston, Texas ____

53,625 Gals..008

6,876.80 1,604.00 1,062.00 2,948.00 1,623.00
540.00 16.00
333.00 2,442.00 7.005.00
862.00 765.88 2' 184.00
76.00 E04.00 1,008.00 177.8G :306.00 576.00
4G.OO 94.00
3.00 516.00
4.00 G.OO G.OO 5.00 3.00 2.00 4.00 4.00
429.00

$32,031.54

192

461 Emanuel, D. B. Thompsons Outfit, June, 1932 Non-skid Surface Treatment on Sheet Asphalt
State Forces Crushing Stone for Base on Route No. 2, in Union County 193

STATE HIGHWAY BOARD OF GEORGIA PURCHASES
The organization and method of procedure of this branch of the Highway Department is in charge of an official designated as the Purchasing Agent who is under the supervision of the State Highway Engineer.
Briefly, all purchases are made through the Purchasing Department. Requisitions for Equipment, Materials and Supplies are made by the unit in need, approved by the head of such unit and forwarded to the Purchasing Agent. Upon the further approval of the Chairman of the Board and State Highway Engineer, bids are requested. These bids are opened at a set time and the items requested are selected upon the approval of the officials mentioned and the award made to the successful bidder or bidders. A purchase order is then issued by the Purchasing Agent. Copies of these orders are sent to the unit requesting the goods, also, to the accounting Department.
When the goods are shipped, invoices are requested to be mailed in duplicate to the Accounting Department. When the goods arrive at destination, if in accordance with the specifications, prices, and terms of the purchase order, the invoice is placed in line for payment. In the event of failure of the Equipment, Materials, or Supplies to meet the specifications of Highway Board, or other requirements of the purchase order, such items are immediately rejected.
It falls upon the Purchasing Department to see that goods reach destination promptly and in good condition. Any irregularity is reported and adjustments are made with the vendor or shipper.
The Board is enabled to obtain substantial discounts, (besides the generally lower prices now prevailing), on some commodities that are in constant use by contracting for same in quantities. These items include grader blades, lubricating greases and oils, tires and tubes, and other supplies and repair parts.
194

Bridge Over Connesauga River Being Constructed by State Forces, Route~No. 2, _Whitfield County
Bridge Being Built by State Forces in Union County on Route No. 2 195

FEDERAL AID APPORTIONED TO GEORGIA FOR FISCAL YEARS 1917 THROUGH 1933

YEAR

AMOUNT

1917 ................... .$ 134,329.48

1918 .. .

268,658.96

1919.

. ...... .

1,749,954.20

1920.... . ....... .

2,557,485.02

1921 ............ .

2,697,150.96

1922.

. ..... .

1,997,957.58

1923 ........... .

1,331,971.72

1924.

1'729,366.09

1925.

1,983,022.99

1926.

2,000,867.00

1927.

1,981,189.00

1928 ........ .

1,979,209.00

1929 .................... . 1,980,015.00

1930 ......... .

1,980,443.00

1931.

3,309,387.00

1932.

3,316,029.00

1933 ..................... . 2, 753,344.80

Total Federal Aid Apportioned to Georgia 1917 through 1932 ....... $33,7 50,380.80 Net after deducting payment on Emergency advance below
Note: Add to above regular apportionment of $33,750,380.80 an Emergency Allotment of $2,077,996.00 which is treated as an advance to be deducted in equal annual payments from regular apportionment until cancelled. One such deduction has been made from 1933 apportionment.

196

PART FOUR MAINTENANCE

.....
<0 CXl
Maintenance Department, Fleet of Trucks

MAINTENANCE

The maintenance organization is very much the same among the officials as described in Thirteenth report.

Mr. C. W. Leftwich has been transferred to Atlanta as Office Assistant to the Maintenance Engineer. Other changes in personnel will be noted in the tables to follow.

Maintenance routine and duties have been explained fully in previous reports, hence a part of this explanation is omitted here.

There has been taken into the State Highway System during

the year ending June 30, 1932, additional mileage amounting to

1,0.'i8.306 miles, making a total of 8,196.816 miles to be main-

tained.



The maintenance department is charged with the duty of regular, special and emergency service to roads and bridges. Also, ::VIaintenance is in charge of detours, Equipment, shops, signs roadside beautification, Buildings and Grounds, Accident reports and Maps.

The addition of over one thousand miles to the State Road System, coupled with the constantly growing traffic in volume and weight has appreciably increased the work of this department.

The State Road System is divided into patrol sections and sub-sections for maintenance; no maintenance contracts are let. Each section is in charge of a competent patrolman with a quota of machine operators, labor and road equipment to keep the roads and bridges serviced at all times regardless of storms, floods and other disasters. \Veather conditions during the year just ended have been normal for road work, no excesses to seriously impair maintenance; this has enabled the maintenance department to operate at a minimum despite the increased mileage taken into the State system and increased volume and weight of motor vehicles mentioned before.

Tables giving patrol sections in detail, mileage of paved and unpaved roads, patrol personnel and other information are to be found on the following pages.

199

STATE HIGHWAY BOARD OF GEORGIA MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE ENGINEERING-DIVISION ONE-HEADQUARTERS, CARTERSVILLE AS OF
JUNE 30, 1932.
L. J. SCOTT, SUPERVISOR, CARTERSVILLE, GEORGIA

Old Section Cong.
No. District

!__ ____ _

7

2__ -----

4

3___ - ---

7

4______ _

9

5______ _

6

8ro 6______ _

5 7

7______ _

7

8 ______ _

5

9 _____ _

9

10___ ----

7

11__ ____ _

5

5

5

12 _____ _ 9

13___ ----

7

14 _____ _

7

14______ _ 7

15___ ----

7

16___ ----

7

17 _____ _ 9

18____ --

7

County

Patrolman

Location

Miles Road
Paved

Bartow_____________________ Sam Wilson_________ __ Cartersville____ _ CarrolL ______________________ L. 0. Baxter_ ____________ Carrollton_____ _

Chattooga____________________ Lee Eleam ________________ Summerville. __ _

Cherokee______________________ E. B. Hubbard ___________ Holly Springs __

Clayton}--------------------- W. C. Elliott__

Jonesboro_____ _

Fulton _____________________ W. C. Elliott _

___ Jonesboro_____ _

Cobb_________________________ W. E. Swanson __________ Marietta_______ _

Dade _________________________ Raymond Doyle___ _____ Wildwood______ _

Douglas ______________________ W. F. Horton_____ _____ Douglasville___ _ Fannin_______________________ H. E. Wilson____________ Hemp ___ _

Floyd_________________________ F. C. Carter_ _____ ___ Rome____ _

!~~i~~i:ried.-i>y-Division-Two~ G. B. Tanner__ _______ ---Fairburn__ _

tF!~~~o-~: ===:::::::::::::::: o-p~n:::::::::::::::::-- :::::::-::::-

Gilmer_ ______________________ J. A. Ray____________ _ _Ellijay___ _

Gordon_____________________ I. M. Floyd_

____ Calhoun ____ _

Gordon} ______________________ J. D. Elrod ______________ Fa~rmount_ ___ _

Bartow ______________________ J.D. Elrod ______________ Faumount ____ _

Haralson_____________________ G. L. Loudermilk________ Bremen________ _

Murray_______________________ W. J. Gregory __________ Chatsworth ___ _

Paulding__________________ __ Gordon Green_____________ Dallas. ________ _

Pickens ______________________ B. E. McCollum___________ Jasper ________ _

33.088 22.720 15.140 23.500 20.990 17.394 45.282 24.100 18.075 22.660 36.740 22.860
0.000 22.348 24.062 15.260 3.427 0.000
6.420 6.680 0.000 42.080

Miles Road Un-
Paved
28.956 51.590 17.990 33.079
17.782} 0.000 4.500 0.000 4.900 22.348 51.627 3.780
12.200 0.000 27.697 18.155 19.403\ 4.910/ 29.645 44.936 54.377 0.000

Total Miles
62.044 74.310 33.130 56.579 56.166
49.782 24.100 22.975 45.008 88.367 26.640
12.200 22.348 51.759 33.415 27.740
36.065 51.616 54.377 42.080

STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE
ENGINEERING-DIVISION ONE-HEADQUARTERS, CARTERSVILLE AS OF JUNE 30, 1932.

Old

Miles Miles

Section Cong.

County

Patrolman

Location

Road Road Un- Total

No. District

Paved Paved

Miles

-----1---- ----------- ------------------------------------

19____ --

7 Polk____ ------------

_B. A. Burnette______ ___ Cedartown_

5.430 44.542

49.972

20___ - --

7 Walker_ __________ - __________ B. F. Nunnelly __ . . _____ LaFayette_ .

22.964 26.019

48.983

21__ ____ _
2L ____ _

7 Whitfield}------------------- D. L. Chitwood ____ -----Dalton __ _ 7 Catoosa ____________________ D. L. Chitwood_ ______ Dalton __

23.952 23.157} 15.853 0.000

62.962

Totals___ _

491.025 541.593 1,032.618

~---~---------------------------------------~-----

....

SUMMARY OF MAINTENANCE PERSONNEL AND PATROL SECTIONS

DIVISION ONE

JUNE 30, 1932

Foreman 1 Foreman 1 Foreman 1 Foreman 1 Foreman 1

Crane Outfit. Asphalt Outfit. Guard Wire Crew. Center Line Crew. Sign Crew.

--

-

-.

Foremen

Sper.ia:l

Division Outfits

Total ___ 5

------

-----

-----

SUMMARY

----

--

-----

Patrol Sections

Patrolmen

Miles Paved

Miles Unpaved

---------
Total Miles Maintained

5

21

21

491.025

541.593

1,032.618

South of Fairburn, Route No. 14
Fulton County, Stewart Ave., Route 3
202

STATE HIGHWAY BOARD OF GEORGIA MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE

ENGINEERING-DIVISION TWO-HEADQUARTERS, GAINESVILLE AS OF JUNE 30, 1932.

R. D. OSTERHOUT, SUPERVISOR, GAINESVILLE, GEORGIA
--~-~~~~~==~ ---~~-- --~------~----

Old Section Cong.
No. District

County

Patrolman

Location

Miles Miles

Total

Road Road Un- Miles

Paved Paved Maintained

l_ _____ _

9 Union_______________

R. J. Butt__________ __Blairsville ____ _ 31.660 12.500

2 ______ _

9

Rabun-Towns ________________ J. E. Barnes~----

_Hiawassee ___ _ 9.840 32.490

3______ _

9

Rabun_ ~----------------

T. G. Nunnally___ _ Clayton ______ _ 22.590 31.969

4___ ----

9

Banks-Habersham\------ ___ T. I .. Brannon~---- _____ Baldwin_

55.978 19.100

8"" 5______ _

9 8

Hall

J

Franklin \--- _____ _

__ W. T. Davis ______ _ ___ Toccoa __

14.659 17.400

9 Stephens J

6____ ---

8 Franklin-Hart____

~B. D. Ayers _____ _

Carnesville

50.590

7 _____ _

9

Banks-Jackson ___________ E. N. Little _____ _

Homer_ _____ _

2.870 31.850

8__ ----

9 Jackson__________

_ __ R. R. Smith________ _

Jefferson __

20.223 21.560

9 ______ .

9 HalL_____ _____

__ T. E. Warf__ ______ _ __ Gainesville ___ _ 16.248 27.831

10__ -----

9 Hall-White_____ __

____ 0. Y. Cook _________ _ _ Cleveland_ _

22.100 28.400

11__ ___ _

9

Dawson-Hall-Lumpkin_______ T. H. Wimpy-~- _

__Dahlonega__ _

12______ _

9

Dawson-Forsyth-Lumpkin___ J. H. Hulsey ______ _

Dawsonville

30.750 2.858

37.919 40.726

13*~ ----

9

~~~~~~h }- ________________ Carl Smith ___ _

Cumming_

2.200 35.390

5

15__ -----

9 Gwinnett____

___ G. D. Tribble __ ~

_____ Lawrenceville__ _ 35.340

15-A ___ _ 5 DeKalb

\----Mark CantrelL

Buford__ _

9 Forsyth-Gwinnett-Hall J

15-B_ ___ _

5

DeKalb-Rockdale }

9 Gwinnett

________ Roy R. Smith ____ _ ____ Loganville

18.000 32.150 10.030 49.977

8 Walton

16__ -----

5 DeKalb____ ___ ~

T. F. Bowman__ _ _ ___ Stone Mtn..

25.611

4.100

44.160 42.330 54.559 75.078
32.059
50.590 34.720 41.783 44.079 50.500 68.669 43.584 37.590
35.340 50.150
60.007
29.711

STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE
ENGINEERING-DIVISION TWO-HEADQUARTERS, GAINESVILLE AS OF JUNE 30, 1932.

Old Section Cong.
No. District

County

Patrolman

Location

Miles Miles

Total

Road Road Un- Miles

Paved Paved Maintained

17______
18___ ---
19 -- .. -2L ____ 22___ - --
23__ -23-A. --2L __ 25 _____
26__ - 27 ___
---
28____ -29 ___ 30___ --

9 8 8 8 8 9 8 8 8 8 5 8 8 8 10 8 10
Totals __

Barrow-Jackson } ______

_A. C. Downs__________ --- Winder ______ -- 40.776

Clarke-Oconee

Clarke-Oconee-Walton __ ---- J. E. Johnston___ ---- --- Monroe_ -------

3.113

Oconee_ -- - - - - - - - - - - - -

..

D. M. Elder___

_ Watkinsville ---

3.630

Clarke-Oglethorpe _____ --- W. J. Yarbrough __

Jackson

} ___ -- -- __ J. M. White___

---- Crawford____ -__ Danielsville_____

23.206

Madison-Clarke

HarL

-------- ---

E. T. Ethridge___

-- _HartwelL_ -- 13.830

Franklin-Hart_ __ Elbert__ -- -DeKalb-Rockdale Newton-Walton

----------- Walter Cox __

---------- Royston__

----- 0. B. Dickerson __

-- _ Elberton __ ----

}----- --- S. H. Johnson_ --- ----- Covington______

11.360 5.687
25.747

Morgan ____ ----

- J.H. Shelton_

---- Madison __ -----

19.892

Greene ____ ---

----- - Judd M. Haywood___ __ Greensboro ----

Taliaferro __ ----W i l k e s ______

- _L.A. Cason -__ C. F. Smith ____

Crawfordville___ 12.686

--- Washington_

14.147

Lincoln____

--- J. H. Holder _

L i n c o l n t o n _____

------

11.493
34.904 24.600 58.500 99.350
26.300 10.300 69.265 27.692
31.500 60.300 12.300 45.200 39.400

- - - - - - - - - .

---------- ---------

------ ---

- ---- --------- 495.031 1,025.056

52.269
38.017 28.230 81.706 99.350
40.130 21.660 74.952 53.439
51.392 60.300 24.986 59.347 39.400
1,520.087

STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE
ENGINEERING-DIVISION TWO-HEADQUARTERS, GAINESVILLE AS OF JUNE 30, 1932.
RECONCILEMENT WITH GENERAL OFFICE

- - - - - - - - - - - - - - " " " - " - - - - - - -

Total Miles Maintained (see Detail Above)__________

______ ___

_____________ _

Deduct miles maintained for Division One, Formerly Milton, 9 Oong. Dist. Now Fulton 5th

Oong. District_________

_ _ _ _ _ _ _ _ _ _ _ _ _

__________ ___________ _

Net Miles Allocated to Division Two _______________ _

495"031 1,025"056 2"200 10"000

1,520"087 12"200

ro 0

SPECIAL OUTFITS-DIVISION TWO

01

Division

Headquarters

Description

Foreman

Location

Two_

______ Gainesville __________ "__ Sign Posting

Two ___ " _________ "__ Gainesville_" _________ Center Line Marking __ "

Two_

_Gainesville _____ "___ "__ Heavy Outfits _____ _

Two_____

______ Gainesville_____

2 Soil Outfits ________ _

Wm. M. Williams ________ Floating _ R. L. McElhannon ___ __ Floating
Various _________________ Floating __Various" ______________ Floating

Foremen Special Outfits
2

Patrol Sections and Sub-Sections
31

SUMMARY-DIVISION TWO

Patrolmen

Miles Paved

Miles Unpaved

Total Miles

in Division

--~"---- _"_ _ _ _ _ _ _ - - 1- - - - " - - - - - - - - - - - - - - - - - -

31

492"831

1,015"056

Route 42. Proj. 973. Henry County, Covering Concrete with Paper, First Test by Dept.
Georgia Emergency F. A. P. 474-B, Grady County Taken June 15, 1931, Type Grading 206

STATE HIGHWAY BOARD OF GEORGIA

MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE

ENGINEERING-DIVISION THREE-HEADQUARTERS, THOMASTON AS OF JUNE 30, 1932.

Section No.

J. M. FLANAGAN, SUPERVISOR, THOMASTON, GEORGIA
~============~=

Old Cong. District

County

Patrolman

Location

Miles Road Paved

Miles

Total

Road Un- Miles

Paved Maintained

I_ _____ _
2 ______ 3 ______ _
{<) 4 _____ _ ~ 5 ____ _
6 __
7______ _ 8 ______ _ 9 ______ _ 10 ______ _
11_ _____ -
12 ______ _ 13 _____ _ 14 _____ _

4 Heard, Troup, Coweta ______ B. H. Hopson_______

Franklin. _____________ _ 60.030

4 Coweta-Troup ______________ E. C. Adams _____________ Grantville__

64.915

4 ~~:l~i;g }- --------- ------ J. B. Kitchens _________ Sharpsburg ____________ _ 49.172

6

6 Fayette______________

___ C. M. Chapman_ _____ Fayetteville ___ _

23.610

6 Spalding-Henry___

J. C. Kitchens __________ Griffin

41.492

6 Henry_________ _

__G. W. Owen____

____ McDonough __ _ 12.ll0 26.110

6 Butts___ ______

A. S. Mills_______

_Jackson __

5.655 25.403

6 Jasper_________

_______ J. A. Allen _____________ Monticello __

5.400 54.850

4 Troup________________ _____ A. D. Davis_____

____ LaGrange __ _

10.070

4 Meriwether-Coweta\ ________ G. W. Williford___

Greenville __

54.952

4 Harris

J

6 Pike-Lamar}------------ ______ D. B. Rawlins __________ Zebulon_

15.282 40.630

4 Meriwether

6 Lamar-Monroe_ _ __________ C. A. Cauthen ___________ Barnesville__

43.054 13.950

6 Jones______ __

_____ W. E. Conley _____________ Gray ___ .

18.791 42.018

4 Muscogee-Harris\ ___________ J. M. Rutledge ___________ Columbus_

57.218

4 Chattahoochee J

60.030 64.915 49.172
23.610 41.492 38.220 31.058 60.250 10.070 54.952
55.912
57.004 60.809 57.218

------ - - - - - - - - - - - - - - - - - - - - - "

STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE
ENGINEERING-DIVISION THREE-HEADQUARTERS, THOMASTON AS OF JUNE 30, 1932.

Old
Section Cong. No. District

County

Patrolman

Location

Miles Miles

Total

Road Road Un- Miles

Paved Paved Maintained

- - - - - - - - - - - - - - - - - - - - - - - - - - - - --~---~---- ---~- --~- - - - - - -

15 16 17 18 19 ~ :20_ 00 21 22_
23 24 25 26 27_ 28 29_
EO
31

4 4 4 6 6 6 4 4 3 3 3 12 12 12 3 3 3
6
[Totals

Muscogee Harris-Meriwether __ Talbot ____ Upson-Monroe Crawford Bibb-Jones Chattahoochee Marion \ Schley J Taylor Macon-Schley __ Peach ___ Houston Pulaski_ Dooly _ Dooly Schley_
Monroe ____

- M. H. Gardiner_ Emory Cox ___
R. A. McKinnon_ W. M. Buffington ---- H. C. Davis ___ __ Walter Roquemore __ W. J. Bush____
W. W. Argo - -

Columbus_
--- Waverly Hall _Talbotton_
Thomaston Roberta_
_Macon
Cusseta __ Buena Vista

G. W. Heath_

___ Butler

--- C. W. Mangham C. 0. Spinks_

__ Oglethorpe _Ft. Valley

_ N. M. Parker

------- Perry __

--- G. W. Dillard __

_ Hawkinsville_

rJ_N. E. Walls ___

----- Unadilla

_ A. S. Perkins ---

__ Vienna

Open-Maintained by

Others _____

FMl'Y

---------- Forsyth_

29.464
7.270 40.865 6.482
19.903 11.530 48.008 17.848 19.865 15.580
535.684

25.720 56.546 58.260 51.720 11.300 25.650 41.630
62.560 41.154 18.560
37.388 15.842 47.750
25.640
865.563

29.464 25.720 56.546 65.530 51.720 52.165 32.132 41.630
62.560 61.057 30.090 48.008 55.236 15.842 67.615
15.580 25.640
1 ,401. 247

Section

STATE HIGHWAY BOARD OF GEORGIA

SPECIAL OUTFITS-DIVISION THREE

- - - - - --- ---,~-==="--~=

Description

Foremen

Location

Division ____________ Shovel Outfit_ _______________________________ G. Q. Reynolds ________________________ Floating Division ____________ Electrician ___________________________________ J. W. Short ____________________________ Floating Division ____________ Bridge Outfit ________________________________ J. H. Redmond ________________________ Floating
Division ____________ Sign Outfit __ ------------------------------- W. H. Poole ____________________________ Floating Division ____________ Center Line Outfit ___________________________ J. T. Flanagan_________________________ Floating

Sections

Counties

SUMMARY-THIRD DIVISION

--

---- --- -

Foremen

Patrolmen

Miles Paved

Miles Unpaved

Total Miles Maintained

31

28

5

30

535.684

865.563

1,401.247

Route 24. Burke County, Gravel Base Road, Louisville to Waynesboro
Route 25. Shoulder Work, Coastal Highway
210

STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE
ENGINEERING-DIVISION FOUR-HEADQUARTERS, LOUISVILLE AS OF JUNE 30, 1932.
H. H. JOHNSON, SUPERVISOR, LOUISVILLE, GEORGIA

Old

Miles

Section Cong.

County

Patrolman

Location

Road

No. District

Paved

------1-----1 ------ -----------1-----------1------- ----

l_ _____

10

Baldwin____ _________

C. L. Dukes__ _ ________ Milledgeville__ _ 31.322

2__ ----- 12 Bleckley-Twiggs ______________ Elbert Wilcher___ ___ Cochran________ _

3__ _____
4 ______

1 Bulloch______________________ H. L. Quattlebaum__ __Statesboro __

7.389

1 Bulloch-Bryan\ ______________ T. A. Dominy ___________ Stilson____ . __ _ 36.963

"">--'
>--'

5 _______

6__ ----

1 Effingham J 1 Burke 1 Burke \ __

________ Joe P. Jordan __ _ ________ Robt. W. Rogers

Waynesboro ___ _ 18.837 __ Midville_

12 Emanuel J

7 ______

1

~~~~~~l }- _______________ S. L. Morris

______ Metter

12

g ______

10

Columbia____________________ W. M. Whitaker ___ _

___ Harlem__

9 ___

12 Dodge \-------------- _____ C. A. Gilbert_

___ Eastman

7.013 27.235

12 Telfair J

10___ ----

1 Effingham ___________________ T. S. Gay_

11_ _____ 12 EmanueL _ ___________ ___ __ J. F. Keen __ _

12 ______ 12 Emanuel

\----------- J. F. OllifL

Springfield_
Swainsboro __ Graymont_

39.137 29.675

1 Bulloch-Jenkins J 13 ______ 10 Hancock ____________________ Alf Roberts__

______ Sparta_____ _

l4 -----

10

Jefferson \ _____ __________ Otis Stevens__ __ ____ ___ Louisville _____ _ 25.386

10 Washington}

15 ________

10

Jefferson

\------------Eugene Beasley__________ Stapleton _____ _ 11.350

10 Warren-Glascock J

Miles

Total

Road Un- Miles

Paved Maintained

13.571 48.425 29.790

44.893 48.425 37.179
36.963

50.255 40.900

69.092 40.900

31.250

31.250

32.300 17.600

39.313 44.835

28.100 22.409 8.900

23.100 61.546 38.575

62.800 54.676

62.800 80.062

40.023

51.373

STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE
ENGINEERING-DIVISION FOUR-HEADQUARTERS, LOUISVILLE AS OF JUNE 30, 1932.

Old

Miles Miles

Total

Section Cong.

County

Patrolman

Location

Road Road Un- Miles

No. District

Paved Paved Maintained

----~--------- ~------------------------r---------------------r-------------r--------r---~----1---------

16___ ----

1 Jenkins_____

___ Warren Allgood__________ Millen ___________________ _ 56.095

17 _____

12 Johnson-Laurens 1 _________ W. L. Kilpatrick _________ Wrightsville ________ _

51.950

56.095 51.950

18 _____

10 Washington

J

12 Johnson-Laurens \------- _H. A. Davidson__________ Soperton________________ _ 39.516

39.516

12 Treutlen-Emanuel J

~ 19_ 1'0 20- -- ---
2L _____
22___ ----

12 10 8
10

Laurens____________

John Crawford _________ Dublin

McDuffie____________________ W. B. Raines _____________ Thomson______ _

}------------------ Putnam______________________ C. C. Crisp_______________ Eatonton______ _

~~~~:~r:

J. B. Stanley_____________ Augusta_______ _

13.788 11.623 18.184
63.835

62.259 29.006 40.606
20.200

76.047 40.629 58.790
84.035

10

23___ ----

1 Screven _____________________ E. W. Lane _______________ Sylvania_______ _ 6.000 54.900

60.900

24____ --- 12 Laurens-Twiggs}--- __________ George PercivaL _________ Jeffersonville __ _

31.658

31.658

10 Wilkinson

25 ______ 10 }if:~~~ck}- ___________________ H. Ivey__________________ Warrenton_______________ _ 45.957

45.957

10

26____ --27 _______

10 12
10

}-- __ -___ -- ________ Glascock-Washington(________ Steve Lawrence___________ Sandersville____ 17.627 78.087

Johnson

J

~~~i::on

B. H. Brookins ___________ Irwinton _______________ _ 65.084

95.714 65.084

12

1-------1--------1--------

Totals___ ________________ - - - -- -- - - -- - - - - -- - - - - --- - -- - - - - -- - - -- - - - - - - -- - - -- -- - -- - - 365.364 1,056.317 1,421.681

STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE ENGINEERING-DIVISION FOUR-HEADQUARTERS, LOUISVILLE AS OF
JUNE 30, 1932.
RECONCILEMENT WITH GENERAL OFFICE MILEAGE

------------------------------------------------- 1----1-----1-----

Total Miles Maintained by 4th Division __________________________________________ _

365 .364 1, 056 .317 1, 421 .681

Add Mileage Maintained by Other Divisions-Dodge County Route 30 by 6th Division __

14.190

14.190

Totals__ ___________ ___

____________ _

Deduct Mileage Maintained for Other Divisions: Bryan County Route 26 for 6th Division ______ _

Telfair County Route 27 for 6th Division _____ _

Total Mileage 4th Division G. 0. Record ______ _

365 .364 1, 070 .507 1,435.871

5.882

4.698

10.580

10.580

----1----1----1------

354.784 1, 070 .507 1,425.291

SPECIAL OUTFITS-DIVISION FOUR

Location

Outfit

Foreman

Headquarters

Floating __ _

Soiling __ _

Floating_

_ Bridge _____ _

Floating ______ HeaVY___ _

S. P. Hewlett _ W. H. Elliott ___ _
Section Patrolman_ __

___ Louisville ______ Louisville
___ Louisville

SUMMARY MAINTENANCE PERSONNEL AND MILEAGE-DIVISION FOUR AS OF JUNE 30, 1932

--Foreman

I

Special Outfits

Patrol Sections

--------

2

27

Total Miles

Patrolmen

Miles Paved

Miles Unpaved

Division

-----------------1-------- ---------

27

354.784

1,070.507

1,425.291

824 Dodge, June, 1932, Surface Treatment on Lime-rock
824 Dodge, June, 1932, Lime-rock Paving 214

STATE HIGHWAY BOARD OF GEORGIA MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE ENGINEERING-DIVISION FIVE-HEADQUARTERS, MOULTRIE AS OF
JUNE 30, 1932.
W. B. WILLIAMS, MAINTENANCE SUPERVISOR, MOUI,TRIE, GEORGIA
-------

Old

Section Cong.

County

Patrolman

Location

No. District

- - - - - - - - - - - --------------- -- -

-

- - - - - - --~- - - - -

l_ __ --

2 Baker_

2______ 11 Berrien __

34____-_-_

11 Brooks

2

Calhoun~

IV. B. Bates IE. Hatcher ---~A. E. Morris __ _ L. L. O'Kelley

1Newton __
]Alapaha Quitman Leary

56 __-_-_-_ {.>..:.>.. 7 ______ 01 8 _____

3 2 11
3

Clay __
Colquitt Cook_ Crisp _____

9 ______ 10 ______

2 Decatur_ 2 Seminole__

E. C. Gill
_IV. c. Bunn
L.A. Brooks_ --- C. A. Webb __
C. C. Robertson __ Paul Peacock

_iFt. Gaines _ _Moultrie
AdeL
Cordele Bainbridge_ D o n a l s o n v i l l e __

11_~~---
12 ______

2 Dougherty_ 2 Early __

- A. P. Brand _ J. B. Barwick_

Albany_ Blakely

13 ___

2 Grady __

14 ___ --

11

Irwin }

Arch Harrell 'Z. T. Mathews_

_Cairo _
- - - - - - Ocilla_~

3 Ben Hill

1156~_-_-~_-_-_--

3 11

Lee _~~ Lowndes ___

17 _____

2

Miller~

18 ____

2 MitchelL ____

I
-19 A. D?llar
:H. M. L1gon --
J. B. Webb _ 0. W. Hardison_

Leesburg Valdosta_ Colquitt __ Camilla ______

19_~----
20 ____ ~ 21 & 22 __ 23 & 24_

3 Quitman_ 3 Randolph___ 3 Stewart_ 3 Sumter_ _______

J. B. Hartley_

Georgetown_

__B. B. Maples ______ --- --- Cuthbert __

N. Ballard __

--- Lumpkin_

_ J. L. McCracken ___

Americus

25~~-----

3 TerrelL ___

J. Wray Patterson_ . --- Dawson

Miles Miles

Total

Road Road Un- Miles

Paved Paved Maintained

--- ---

- ------- - - - - - -

42.670

42.670

56.160

56.160

49.284 26.501

75.785

53.950

53.950

37.411

37.411

37.316 40.564

77.880

21.015 23.455

44.470

15.444 26.207

41.651

23.270 47.330

70.600

13.670 11.830

25.500

25.657 24.776

50.433

17.310 52.130

69.440

27.893 28.127

56.020

29.161 36.270

65.431

28.017 58.380
51.312 2.619
14.929 30.921 29.408

16.310 46.380
22.834 34.041 40.174
52.371 44.797 12.760

28.017
74.690 46.380 '!4.146
33 660 C 174 67.300 75.718 42.168

Old Section Cong.
No. District

STATE HIGHWAY BOARD OF GEORGIA

MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE

ENGINEERING-DIVISION FIVE-HEADQUARTERS, MOULTRIE AS OF

JUNE 30, 1932.

--=-------~ -=~== - - - - ---===cc=-========-====-c===---cc--o:

Miles Miles

Total

County

Patrolman

Location

Road Road Un- Miles

Paved Paved Maintained

26 _____ _ 27 _____ _

2 2

28 _____ _

3

29 _____ _

3

30 _____ _ 12

3L ____ _

2

Thomas ______________________ Arthur Knapp ___________ Thomasville____ 52.269

Tift_________ ________________ H. G. McPhauL _________ Tifton_________ 19.893

Turner_ ______________________ J. A. Putman ____________ Ashburn _____ _ 15.729

Webster_ ____________________ F. H. Jordan ____________ Preston _________________ _

Wilcox_______________________ J. W. Morehouse ________ Abbeville ________________ _

Worth________________________ G. E. Gissendaner_ ______ Sylvester____

35.622

20.777 28.147 10.489
24.110 44.290 19.748

73.046 48.040
26.218 24.110 44.290
55.370

N--------T_o_t_a_ls_____~----_-_--_-_-_--_-_-_--_______-_-_-_--_-_-_-_--_-_-_--_-_-_--_-_-_--_-_-_--_-_-_-_--_-_-_- _--_-_-_--_-_-_--_-_-_-____5_9_9_.1_1_9___9_2_4_.6_0_9___1~,_5_23_._7_28_

~

SPECIAL OUTFITS-DIVISION FIVE

Division

Description

Foreman

Headquarters Location

Five ____________ Asphalt Crew _______________________ J. H. Selman__________________ __Moultrie _______ Floating Five ____________ Bridge Crew__________________________ J. C. Crews __________________________ Moultrie _______ Floating
Five ____________ Heavy Outfit No. L _________________ George Nelms ________________________ Moultrie ______ Floating
Five ____________ Heavy Outfit No. 2 ___________________ R. L. Croxton ________________________ Moultrie _______ Floating Five ____________ Shovel Outfit ____________________ Alex Blair_ ___________________________ Moultrie _______ Floating
Five ____________ Center Line Outfit ______________ J. M. Smith__________________________ Moultrie _______ Floating

SUMMARY-DIVISION FIVE

-------==---- --'----==~--,,

- - - - - - - - - - - - - - - - -- - - -- - - - - - - - -

Foremen Division Special Outfits

Patrol Sections

Patrolmen

Miles Paved

Miles Unpaved

Total Miles Maintained

6

31

29

599.119

924.609

1,523.728

Proj. 430, Lee County, Route No. 50, Albany-Dawson Road, Cone., Paving, Sept., 1932

STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE ENGINEERING-DIVISION SIX-HEADQUARTERS, WAYCROSS AS OF
JUNE 30, 1932.
W. P. PHILLIPS, SUPERVISOR, WAYCROSS, GEORGIA

Old

Section Cong.

County

No. District

- - - - - - - - - - - - -~-

-----~---

L---2
~ >---"
00
3 _____
4 5 __ 6 ____ 7 ______ 8_
9

ll Charlton}_

ll Ware

ll Atkinson1 ll Clinch __

ll ll

l Echols
Ware

ll

Atkinson~

ll

Clinch ___

ll* Lanier I
ll* Lowndes J

ll Echols }ll* Lowndes

11 Atkinson}

11 Ware 11 Coffee_

11 Bacon-Coffee\-- __

11 Ware

f

11 ll

} Appling
Bacon

11 Jeff Davis)

11 Appling_\_ .. _

11 Wayne f

Patrolman
------ ----------

Miles

Miles

Total

Location

Road Road Un- Miles Paved Paved Maintained

-

- - - - ~--- - - - - - - - - - - - - - -

lA. L. Taylor_
I
-~Willie Bell

--- Mattox Homerville

43.497
I
31.348

57.578

43.497 88.926

I
.J. J. Newham_
E. N. Ellis _J.D. Wright_
G. W. Davis _ Carl Adams __
J. B. Hughes ____ A. E. Bradley__

Lakeland __
-~ St9,tenville _Pearson _ 'Douglas_ _Alma
_Hazlehurst B a x l e y __

12.237 43.800

3.504
26.090 44.507

56.450 42.218 29.800

24.443 19.305
21.163 I 36.3461

56.037
56.450 45.722 55.890 41.507
43.748 57.509

STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE
ENGINEERING-DIVISION SIX-HEADQUARTERS, WAYCROSS AS OF JUNE 30, 1932.
---

Old Section Cong.
No. District

County

Patrolman

Location

Miles Miles

Total

Road Road Un- Miles

Paved Paved Maintained

- - - - - - - - - - - - - - - - -~----

10 _____ ~

1L __ ~--

12 ______

!\:) ~

1143_--__-_-_-_-

15 ______ 16 _____ 17 ______

18- -----

19 ______
20 ______
2L _____ 22 ______

12* Dodge \ __ ~ _________ --------- N. F. Smith __

--- McRae_

17.860

12* Telfair/

12 Wheeler\--

W. B. Lyles __ ~

_Glenwood

2.500

1 Tattnallf

12 Toombs ______ 1 TattnalL ______

----- 0. T. Brown ___

---- Lyons

_ 0. 0. Galbreath ___ ~

Reidsville __

26.088

1 Tattnall \ __

------ N. L. Ham ____

_ Claxton __ .

2.000

1 Evans J 1* Bryan_____

W. I. Kennedy ______ _ Pembroke __ ~

1 Chatham___

1

Bryan \- - -

1 Libertyf

_ Archie Minchew ____ - - ~ _ Savannah __

~ - - P.M. Hendricks __

_ Riceboro~ __

58.316 27.361

1 Liberty )

1 1

~~~toshJ -----

G. W. Hendrix __

Ludowici_

1 Mcintosh\----

D. E. Oliver~

---- Darien ______

34.788

11 Glynn J

1

Long \- ---

11 Wayne/

_ N. A. Bradley ______ ----

Jesup ________ -

9.617

11 Glynn _________

_ L. 0. Outlaw ___

----- Brunswick ____ 33.191

11 11

j;'i~~~ee }- _______

---- R. 0. Tillman __

_ Screven __

38.557

11 Ware

47 ._540 43.839 28.498 45.260 39.178 47.004 11.241
54.168
49.693

65.400
46.339
54.586 45.260 41.178
47.004 58.316 38.602
54.168
34.788
59.310
33.191
38.557

-------------
Old Section Cong.
No. District

STATE HIGHWAY BOARD OF GEORGIA

MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE

ENGINEERING-DIVISION SIX-HEADQUARTERS, WAYCROSS AS OF

JUNE 30, 1932.

---------------------

---------

County

Patrolman

Location

Miles
Road Paved

Miles

Total

Road Un- Miles

Paved Maintained

23 ______ 11 Brantley)

11 11

Glynn Ware

I>--

11 Charlton)

N 24 _____

11 Glynn \-

N
0 25_- ---

11 Camden! 11 Charlton\---

11 Camden f

26_----

12 Montgomery\ __

12 Toombs J

Totals ---

----- A. H. Morris __

__Nahunta _______ 41.206 39.000

80.206

------- E. M. Beery____ M. F. Futch____ I. B. Webb _____

_ Woodbine ______ 34.097 ---------__ Kingsland ______ ---------- 32.606 __ Mt. Vernon _____ 12.795 43.484

34.097 32.606 56.279

545.165 --- ---- "------- ------- ---------------- 767.008 1,312.173

STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE SECTIONS, PERSONNEL AND MILEAGE
ENGINEERING-DIVISION SIX-HEADQUARTERS, WAYCROSS AS OF JUNE 30, 1932.
RECONCILEMENT WITH G. 0. MILEAGE

County

Explanation

Miles Miles Total Paved Unpaved Mileage

Total Miles Maintained by 6th Division_________________ ______________________ 545.165 767.008 1,312.173

Add Mileage Maintained by OTHER Division:

Bryan________ Route No. 26 by 4th Division_________________________________________________ 5.864

5.864

Telfair________ Route No. 27 by 4th Division______________________________________ __________ 4.698 _________ _ 4.698

Lanier________ Route No. 11 by 5th Division __________________________________________________________ _ 7.700

7.700

!\:)

~

TotaL____ _________________________________________________________________ 555 .727 774.708 1,330.435

Deduct Miles Maintained for OTHER Divisions:

Dodge________ Route No. 30 for 4th Division_______________________________________ 14.190 _____________________________ _

Lowndes______ Route No. 11 for 5th Division_______________________________________ 10.200 _________ _ 24.390 24.390

Total Mileage Allocated to 6th Division ________________________ _

555.727 750.318 1,306.045

SPECIAL OUTFITS-DIVISION SIX
==~==~~~=====-=~-=~---

----=-=-==~-=-====~=====-=-=-==-

Division

Description

Foreman

Headquarters

Location

Six______________ Asphalt Crew_________________________ E. L. Bradley_____________________ Waycross ___________ Floating Six _____________ Shovel Crew___________ .. ______________ C. A. Webb_______________________ Waycross ____ ... _____ Floating Six _____________ Bridge Crew __________________________ R. 0. Smith ______________________ Waycross ___________ Floating Six _____________ Shop Crew ___________________________ Mechanics________________________ Waycross ___________ Moultrie

- ----- - - - - - - - - - - - - - - - - - - - - - - - - - -

STATE HIGHWAY BOARD OF GEORGIA SUMMARY-DIVISION SIX

Foreman Div.-Special
Outfits
--
3

Patrol Sections and Sub-sections
26

Patrolmen 26

Paved 555.727

Miles Maintained Unpaved 750.318

Total 1,306.045

--- -

-

Division

RECAPITULATION OF PERSONNEL AND MILEAGE-JUNE 30, 1932.

-

--

-- -

-

--

--

-

--

-

---- -

-

---

--

-

--

-

-

Counties

Foremen Special
Outfits

Patrol Sections and
Sub-Sections

Patrolmen

Miles Maintained

Paved

Unpaved

---- ----"-- -- - - -

----

---------

Total

L __ ---------

21

2 ________ 3 ________

-----

30 28

4_________ ---

24

5 2
5 2

21 31 31 27

21 31 30 27

5 _____________

30

6

31

29

6 _____________

26

3

26

26

- - - ------- ---------- . ------ - - - - - -

Totals ____

159

23

167

164

491.025 492.831 535.684 354.784 599.119 555.727
3,029.170

541.593 1,015.056
865.563 1,070.507
924.609 750.318
5,167.646

1,032.618 1,507.887 1,401.247 1,425.291 1,523.728 1,306.045
---------
8' 196.816

S. A. P. 1010-B, Thomas County, Route No. 36, Thomasville-Moultrie, Grading by County Forces, 1932

STATE HIGHWAY BOARD OF GEORGIA
INVENTORIES
All investments in Land and Buildings, Automobiles, Road Equipment, Engineer's, Office, and Shop Equipment, are inventoried periodically.
Also, a card system is in use and every piece of Equipment is listed on a separate card giving description and location of equipment and the name of the person in charge. All purchases, transfers, and sales, are posted on the cards. This work is performed by a competent accountant and under the supervision of the Treasurer all Equipment is appraised with a proper percentage of reduction in valuation for depreciation.
Warehouse stock of parts and supplies is inventoried under the supervision of the Warehouse Superintendent and a card system of recording additions to and deductions from stock is in use similar to that employed in recording heavy equipment.
Inventories of small tools, and expendable supplies are kept at the Division Offices and East Point Shop under the supervision of the Maintenance Supervisors and Shop Superintendent.
Under the heading of Equipment will be found tables describing the major road Equipment and number of units of same.
EQUIPMENT
This branch of the Highway Department requires close attention. It is under the Maintenance Engineer who employs a Superintendent of Equipment to keep in touch with the condition of all motor vehicles, and road machinery and buildings and grounds.
The Equipment Superintendent makes periodical visits to all parts of the State to inspect the machinery in use for possible need of repairs or replacements.
Most of the obsolete machinery has been disposed of to best advantage. Nearly all Equipment received from the Federal Goverment as "surplus war material" has been in use so long that it is not economical to repair most of it. This obsolete and worn machinery is being (or has been) replaced by modern equipment which economizes work and operation.
'fhe following tables give lists and descriptions of the principal equipment in use. There is a large number of pieces of minor equipment which is omitted here.
224

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF TRUCKS, TRACTORS, GRADERS, AND OTHER HEAVY ROAD EQUIPMENT
FOR MAINTENANCE AND CONSTRUCTION AT JUNE 30, 1932

MAINTENANCE

CONSTRUCTION

DESCRIPTION

Div.

Div.

Div.

Div.

Div.

Div. I Brid~e I E. D.

No.1 No. 2 No. 3 No.4 No.5 No. 6 Pt. Crew Sh1p

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - ---~-- - - - - - - - - -- - - - - - - - - - -

Total M1int.

G. B. Asphalt Convict Lobora- Total Grand Scott Dept. Outfits torv Constr. Total

Trucks. ________ _ Tractors.------Graders_. ______ _ ro Other HeavY Road Equipment

64

71

88

100

93

95 I

28

35

38

39

30

27 1--

51

77

75

84

68

61

16

14

19

12

27

23

"'01 Total Number Road Working

Equipment.------------------

159

197

220

235

218

208

515

21

30

36

88

603

197

1

16

23

220

416

6

13

42J

113

--~=-1 25

78

l(Jj

218

. ---- ------ -------

1, 241

24

68

229 1, 470

I

Note: The above totals represent heavY road working equipment and animals in use. but does not include light road equipment. automobiles. shop, garage, warehouse, quarry, engineers, office and convict camp equipment, or land and buildings.

STATE HIGHWAY BOARD OF GEORGIA TRUCKS OPERATED AND ON HAND JUNE 30, 1932

MAINTENANCE

MAKE

Div. No.1

Div. No. 2

Div. No. 3

Div. No. 4

Div. No.5

Autocar .. Aviation _______ _

Chevrolet_-- _________ ------

Corbitt_ Federal ___________________ _
Ford "A"_ ~F. W.D .. ----------------0> G. M. C ... ______________ _
G. M. T __________ _ Graham _________________ _

1

10

5

2

19

15

32

2

3

8

Gramm ____________________ --------------------

Hug_________________________

----------- _

Indiana__ ----------------- 27

36

44

InternationaL __________ _ 2

41

26

15

Kelly-Springfield _________ _

Liberty ___ ----------------Mack _______________________ --------------------_

Packard__ ----------------

l

RReeopu__b_l_i_c_._-____-_-_-_-_-_-_-_-_-_-_-_-_-_--_

Selden_----------------------White _____________________ _ 4

TOTALS ______________ _ 64

7l

88

100

93

Div. No.6
13 33 13
10 22
95

E. D. Shop

Laboratory

G. B. Scott

21

CONSTRUCTION

Paint Crew

Asph1lt Dept.

Conv. Dept.

11 3
15

2

30

36

Total
5 43
4 72 92 13 20
6 138 115
l 26 21
21
603

STATE HIGHWAY BOARD OF GEORGIA TRACTORS IN SERVICE AT JUNE 30, 1932

MAINTENANCE

CONSTRUCTION

MAKE

Div.

Div.

Div.

Div.

Div.

Div.

G. B. Asphalt Convict

fotll

No.1

No. 2 No. 3

No. 4 No. 5 No. 6 Scott

Dept.

Outfits

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --~-

- - - - - - - - - ~--- ~---

~-- -~--~~- --~-

Allis-Chalmers Mod. 1 U

3

Case Model C j_ _______ .. __ _

2

Caterpillar 15-------------

5

1':> Caterpillar 30----------------------- _____________ _

15

18

24

23

17

15

117

~Caterpillar 60.. -----------------

1

4

2

25

Caterpillar 35 _____ _

6

Caterpillar 2 ton __

Cletrac_____________ ---- -----------Holt 2 ton _________ _

Holt 5 ton ____________ _

4

11

Holt 10 ton ____________ -----------------------------------

1

5

Mead-Morrison 8Q __

1

Monarch 35____________ _

28

Monarch 5Q ___________________ _

1

McCormick-Deering 5 ton __ _

2

Oliver Hart-Parr 28-44 _

TOTALS _________ _

220

STATE HIGHWAY BOARD OF GEORGIA HEAVY ROAD EQUIPMENT AT JUNE 30, 1932
MAINTENANCE

r

CONSTRUCTION

DESCRIPTION

Div.

Div.

Div.

Div.

Div.

Div.

Total

No.1

No. 2

No. 3

No. 4

No. 5

No.6

----~ - - - - - - - - - - - - - - --~-- - - - - - - - - - - - - ~ - - - - - - - - - - -

I G. B. Asphalt

Scott

Dept.

Convict Outfits

Asphalt Distributors_

Boiler-Engine Attachment____

--- ----------

Engines_________________________

----------- _

~Graders-Various Sizes___________________

51

77

75

81

68

61

416

!)5 Heaters. Tar-Asphalt. Various Sizes_________ 11

g

11

12

15

65

Mules. Good-Fair-Poor______________________ _

19

Road Machines-------------------------------Road Rollers. ________________ -- ___ -- __ ---------

18

7

Steam Shovels __

- - - - - - - - - - - - - - - -----~---- - - - - - - -

TOTALS----- __________________________ ----.- 67

91

94

96

95

86

529

4 3

74

--- --- ------

32

84

Total
4 3 6 13 l 74 2 8 7
118

STATE HIGHWAY BOARD OF GEORGIA AUTOMOBILE EQUIPMENT AT JUNE 30, 1932

MAKE OF CAR

General Office
and Various

Div. No.1

Div. No. 2

Div. No.3

Div. No.4

Div. No. 5

Div. Total No. 6

Buick... ________________ _ 8 Che\To1et_ ______________ _ 12 Dodge. ___________ ...... _

18

2

38

3

Ford "A"--------------- 18

30

32

26

37

35

32

210

Ford "T" _.. ----Hupmobile_____________ _
LaSalle. ________________ .
Oldsmobile....... ______ _ Pontiac _________________ _

1

2

1

2

3

Reo..... ________________ _

Rockne ________________ _

Studebaker. .. ----------

TOTALS ....... 47

41

40

33

41

41

39

282

229

824 Dodge, June, 1932, Surface Treatment on Lime-rock
Placing Stone Base on State Route No. 2, in Fannin County 230

STATE HIGHWAY BOARD OF GEORGIA
EAST POINT SHOP
This shop is the main unit for work done on the Equipment of the Department. Its activities include rebuilding, reconditioning, repairing road and stationery machinery; Manufacturing cabs, dump bodies, center line markers, rock crushers, tanks, signs, and other machinery and supplies; also, maintenance of buildings and grounds. In fact, all general and special work connected with the physical upkeep of plant and machinery. This unit is equipped to meet all mechanical requirements of the department and its Equipment includes high grade machines and machine tools, blacksmiths, tank makers, carpenters, and painters tools and supplies.
All work is done on a non-profit basis. The labor, materials and parts are charged at a cost price and when the job is finished a small percentage of the total cost is added to cover office or overhead expense.
In addition to the East Point Shop, each Engineering Division has a small shop for minor and emergency repairs located at Division Headquarters.
All machinery, new and rebuilt or repaired, is inspected and our own identifying numbers stamped or stencilled thereon in addition to manufacturers numbers.
The shop still operates a truck service to and from Divisions and patrol sections. The saving bv this service is appreciable, particularly in time. A machine is loaded on the truck and carried to destination and delivered to consignee right on the job and then the truck loarls the machine replaced and transports it to the shop on the return trip. This service is frequently accomplished with no loss of time to the employees in the field.
An idea of the activities of the shop can be formed by reading the succeeding table of jobs completed during the period reported.
231

STATE HIGHWAY BOARD OF GA.

PRODUCTION REPORT-EAST POINT SHOPS FOR FISCAL YEAR ENDING JUNE 30, 1932

Brought into July 1931 and listed among following jobs, 80.

Jobs Completed and Billed, July. . . . . Jobs Completed and Billed, August. . . . Jobs Completed and Billed, September. . . Jobs Completed and Billed, October . . . . . . Jobs Completed and Billed, Nowmber. . . Jobs Completed and Billed, December..... Jobs Completed and Billed, January. . . . Jobs Completed and Billed, February. . Jobs Completed and Billed, -:\Iarch. . . Jobs Completed and Billed, ApriL . . . Jobs Completed and Billed, ::\fay. . . . . Jobs Completed and Billed, J unc. .

135 96 116 121 100 123
111
. . . . . . . 103 113 88 7 6 151

Total .................... .

. ................ 1,333

Jobs incomplete, carried into succeeding year at 6-30, 53.

DISTRIBUTION OF JOBS COMPLETED DURING YEAR

JOBS

Maintenance and Construction ..

87

Asphalt Department ....... .

45

Convict Department. .. .
v..rarehouse ............ .

61 16

Sign Department.... .

22

Bridge Department. . . . . . . . . . . . . . . . . . . . . . ...... .

9

G. 0. Maintenance & Shop Improvement ...

12

Laboratory and Tests. . . . . . . . . . . . . . . . . . . .......... .

23

Secretary of State and Individuals ....
Shop Expenses ................ .
Official Automobiles ........... . Miscellaneous G. 0. and Junk...

3 21 317 . ......... . 7

Division No. One. . . . . . . Division No. Two. . . . . . . .

. ............. . 86 . ..................... . 173

Division No. Three.

. ...................... . 154

Division No. Four. . . . .............................. . 99

Division No. FiYe. . . . . . . . . . . . ................... . 98

DiYision No. Six ...................................... . 100

Total Jobs Distributed ............................. 1,333

232

Proj. 263. Clarke County , East End of Bunt Showing Pressure Cells 1- 2- 3-4
233

STATE HIGHWAY BOARD OF GEORGIA SIGNS
This feature of the departmental activities has been so often and so fully described in previous reports that it seems superfluous to take up space with descriptive narrative in this report.
There has been no change in the size, shape or colors of signs posted and the traveling public has become accustomed to the standardized forms in use. The roads are well marked as a whole, but new mileage being taken into the State system, detours and relocation of old routes, keep the sign crews busy in all divisions. Besides, there is much painting and repairing to be done to old signs, also, center line marking has to be constantly renewed.
Georgia has been complimented repeatedly for intelligent sign posting on the State System. On the main routes there is no excuse for wandering off the Highways.
Following is a table showing the number and kinds of signs placed during the year:
234

-----

STATE HIGHWAY BOARD OF GEORGIA
SIGNS SHIPPED TO ENGINEERING DIVISIONS FISCAL YEAR ENDING JUNE 30, 1932
-----~

Signs Shipped Direct from Manufacturer

Signs Shipped from East Point Shop

Description

Total

Grand Total Total

Div. Div. Div. Div. Div. Div.

Div. Div. Div. Di1. Div. Div.

I I One Two Three Four Five Six

One Two Three Four Five Six

. -------------- --- --- --- ---- ---- - - --- --- --- --- ---- - - ---- --- ---

Curve left -------------------------- 450

350

350

300

300

150 l, 900

136

297

216

120

48

15

832 2. 732

Curve right~ ________________________ 450

270

350

300

300

150 1,820

211

297

216

120

48

15 907 2. 727

S curve left _________________________ 175

75

215

175

75

75

790

38 174

28

120

6

366 l, 155

S curve right _______________________ 175

75

215

175

75

75

790

51 402

40

120

6

619 1,409

Turn lefL --------------------------

75

100

50

75

75

25

400

91

11

36

138 538

Turn right. ----------------------

75

100

50

75

75

{\0 Side road left --------------------- 150

175

240

175

125

""CJl Side road right_ ----------------Cross Road _________________________

150 225

225 225

225 250

175 175

175 325

25

400

65

11

36

75

940

36

14

80

75

168

75 1,025

37

14 153

75

75 l, 275

103

112

72

291

72

112 512

31

404 l, 344

31

310 l, 335

32

682 1,957

Slow________________________________ 200

125

275

!50

200

50 l, 000

113

96

92

24

48

39

412 1, 412

Stop

-------------

Railroad _____________ ------_

300

500

200

375

150

75

5C

150

150

1,375

479

413

481

975

432

377 3,157 4,532

575

122

168

57

72

48

84

551 1, 126

Church ________

------------

100 150

100

75

42~

48

33

16

36

Junction. ----------- -----------

50

25

50

50

150

325

14

49

12

Narrow Bridge _____________________ -

--- --------

10

208

48

133 558

36

lll

436

268

268

City Limit ___________________

100 -------- 100

150

350

24

36

67

74

24

24

249

599

30x36 Sec. Signs_

-------------

-------- -----

89

Tractors with lugs prohibited ____ -------- -------- ----

----- -------

12

75

Men working-Slow --------------

6

6

12

6

42

School Zone------------------------ 100 200 150 100 150

Winding road_ -----------------

150

150

50

50

700

201

145

400

44

Underpass ________ --------------

50

20

70

38

Black and White Stripe_

90

50

36

54

146

36

68

36

48

74

-------- ------48

229

229

123

123

236

278

48

546 1,246

118

518

44

114

48

48

24x24 yellow. black border ________ -------- -------- --------

Detour_______ ------------

--------------

!56

228

36

36

480

72

96 1, 058

--- --------

36

1.068 36

STATE HIGHWAY BOARD OF GEORGIA
SIGNS SHIPPED TO ENGINEERING DIVISIONS FISCAL YEAR ENDING JUNE 30, 1932

Signs Shipped Direct from M1nufacturer

Signs Shipped from E.st Point Shop

Description

Div. Div. Div. Div. One Two Three Four

-~-------

-----------------------~~-

Lookout for Cattle.

U. S. Route Markers

50

U.S. Route left

U.S. Route right_ __

4x30 Wooden Slats __ _

l2xl2 markers _____ _

Toll I

Div. Div.

Five

Six

- - -----~

80

130

Div. One
371
2,896 1, 295

Di1. Oiv. Two Three

169 51 54 1, 160 755

274 134 131 3, 780 l, 023

Div. Four
200
900 l, 3(i0

Div. Five
12 115 l()O 100 1, 040 1, 036

Div. Six
252 31 31 900 1, 52(1

Yellow. black border. l2x12 markE r

gro;

Numbers 4x6 Detour_______ _

10x30 Striped. __

10x48 Striped--

30x36 Detour__ _ 4x15 Wooden Slats_ Detour Hands Reflectors_
Total Signs

-I
. ~~,:~ '"' '.J '"'

Division One, from Factory_____ ___ 2, 749

Division Two, from Factory

___ 2,726

Division Three, from Factory___ _ 3,052

Division Four, from Factor, _________ 2,531

Division Five, from Factory__

_ 2,836

Division Six, from Factory_____

904

---

1, 300 1, 570 2, 478 1,100 120 880

6

2

21

480

520 300

100

480

14 i~ I

----

96

'~- =.~ ,;,: ',.I "j~"~' I "'" I 'd~,
CONSOLIDATION From East Point Shop _______ 8,456 Grand TotaL ____ ll,215

From East Point Shop ______ 6,838 Grand TotaL ____ 9,564

From East Point Shop _______ \0,847 Grand TotaL ____ l3,899

From East Point Shop. ______ 6, 734 Grand TotaL---- 9,2ii5

From East Point Shop _____ 4,035 Grand TotaL ____ 6,871

From East Point Shop__ __ 4,614 Grand TotaL ____ 5,518

Total
12 1,381
319 319 11,036 6, 989
7, 748 29
1,400 480 26 96
"~'

Grand Total
12 1, 511
319 319 11,036 6, 989
7, 748 - 29 1, 400
480 26 96 18 48
56,332

Total Signs.. ____________________ 14.798

41,534

56,332

STATE HIGHWAY BOARD OF GEORGIA

SIGNS-PAINT PURCHASES

~~~==~-=-------

FISCAL YEAR ENDING JUNE 30, 1932
-~=---=-----

Description

Gals.

Gals.

Gals.

Gals.

Div. One Div. Two Div. Three Div. Four

Gals. Div. Five

Gals. Div. Six

Gals. Total

------ ------

-------

----~-

- - - - - - --~--

A l u m i n u m ___ Black EnameL_ _ _

----------

5

27

1 20

47

1 13

ll

--

7

15

133

Black Lacquer_ ____

20

20

Paint Remover _____

6

6

Plimer_ _____ ---
Solvent Naptha__

4

21

10

25

---

10

&5 Thinner _________

2

1

65

10

78

"""Turpentine ___

5

5

Varnish_________

1

9

10

White EnameL

44

10

44

15

7

6

126

White Undercoat___

8

6

41

10

1

8

74

Yellow EnameL . -

ll

17

43

10

5

18

104

Yellow Lacquer__ -------

55

55

Yellow Undercoat_________ -----------

1

13

--------

2

10

----

5 - -- - - - - - - - - - - -

31

Total Gallons Paint___ ----------

98

l 73

362

75

29

47

684

Between Americus and Ellaville, State Route No. 3, Note Planting, Div. 3
Planting Along State Route No. 10, South of Washington 238

HIGHWAY BEAUTIFICATION This work has been carried on as outlined in Thirteenth Report. As a rule the civic organizations of the State furnish the plants and help select the locations, in their vicinity. for planting. The work of planting and servicing is done by the Maintenance forces of the Highway Department. Several counties in the State through local agencies have given much time and many plants for this purpose and some stretches of our Highways are showing progress and improvement. This branch of Highway activities is of comparatively recent origin. In the early years of the Department there were not sufficient funds for the enterprise but, of late, the Board has been enabled to proceed with the work in a limited way. We are looking forward to the time when our roads will be lined by attractive trees and shrubbery from end to end of the State.
Intersection State Routes 60 and 25, Waycross to Brunswick
239

Route 25. Chatham County,ISavannah to Tybee. Palms and Oleander

.. ------------------------------------~~~.~~~~
STATE HIGHWAY BOARD OF GEORGIA
ACCIDENTS REPORTED COMMENT
Accidents reported for the Fiscal Year ending June 30, 1932, consist of those occurring on the State Highway System which were reported by State Highway Employees.
No doubt there were several minor accidents and a few major accidents that were not witnessed by or reported to Highway Employees. Further, accidents in cities and on county roads not on the State System are not fully recorded.
As stated in the last Annual Report, unless and until a State Constabulary is instituted, a number of accidents will never reach the knowledge of :State Highway Officials.
A comparison of accidents reported for year just closed, with year closing June 30, 1931, shows:
Persons Killed, 1931, 125; 1932, 145. Persons Injured, 1931, 581; 1932, 423. Property Damage Only, 1931, 77; 1932, 48. Accidents caused by Intoxicated Drivers, 1931, 48; 1932, 31. By far the most accidents were caused by Reckless, Careless Driving, 1931, 118; 1932, 128. Speeding, 1931, 101; 1932, 85.
Total Accidents Reported, 1931, 406; 1932, 319. The ratio of fatalities to accidents shows: 1931--0ne fatality to 3.2 accidents. 1932--0ne fatality to 2.2 accidents. Injuries show: 1931--0ne Injury to .7 accidents. 1932--0n<: Injury to .75 accidents. Perc<:ntage of Accidents due to Reckless Driving in 1931 was 29%; in 1932, 40%. Percentage of Accidents due to Speeding, 1931, 25%; 1932, 27%. Thus it will appear that though the accidents reported were fewer for the year closing June 1932 than for 1931, the results were more disastrous by ratio and percentage comparison. Over SO% of the accidents each year were caused by Reckless, Careless Driving and Speeding, and the percentage was greater in 1932 than during 1931.
241

STATE HIGHWAY BOARD OF GEORGIA

ACCIDENTS REPORTED

FOR FISCAL YEAR ENDING JUNE_30!1932

- ---

~------
Ca:use of Accident

Collision with
Motor Vehicle
in

Collision with Other
Vehicle
in

Collision

Drove

with

Drove off

Parked off

or

Vehicle Roadway into

At

Ran

R.R. Ran into

Cross- into Pedes-

ing Animal trian

Total

Motion Motion

Bridge

Blinded by Bright Lights _____________

3

Blinded by Dust ___________________

1

Deficient Brakes ___________________

1

Deficient Deficient

Lights ___ Steering Gear_

____-_-_-_-_-_-_-_-__-_-

4

Deficient Tires_ ___ ____ _. ___ ------- - --Driver Asleep ____________________

9

1

1

1

1

1

1

1

1

4

3

1

9

2

3

1

1

14 3 4 13
ll 4 1

"' Driver Intoxicated _______________

8

3

18

1

2

31

l.t Failure to Observe Signs _______

2

2

2

6

Pass car without Right-of-way_ Reckless, Careless Driving ____ Skidding ___________ --------Speeding ___ -------- -------Wrong Side of Road _________

6 41

3

9

9

3

37

ll

12

3

12

128

1

1

12

1

1

52

12

1

3

3

85

5

2

2

9

--- --------------- ------------ - - - - - - - - - - - - - - - - - - --

Totals_____________ _____ _

83

25

10

134

31

13

6

17

319

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~--- - - - - - ---1~-- - - - -

Accidents on Curve ________ _ Accidents on Straight Road _____ _

19 64

7 18

2

55

13

9

3

8

79

18

4

6

14

------------- -------- ---------------

108
211
----

Totals_ __ __________________ _

83

25

10

134

31

13

6

17

---------~----- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

319 ---

Persons Injured___________ _ Persons Killed ___________ _

137 29

45

10

157

35

15

lO

14

423

12

9

66

- - - 10

2

3

14

145

---------------

Property Damage Only __

13

5

1

22

3

3

1

48

STATE HIGHWAY BOARD OF GEORGIA ROAD INFORMATION
The maintenance department is headquarters for information of every description as to the road types, conditions, and routes. The department keeps in constant and daily touch with every section of the State and the travelling public can visit, write or telephone either the General Office at Atlanta, or the Division offices for full information in regard to detours, condition of roads, and most direct route to be followed to proposed destination.
In normal times the answers to these requests are simple but during storm or flood periods the route to be decided upon is more complicated. Also, construction frequently causes rerouting of traffic over detours not as direct as the regular routes, or the selection of an entirely different route to that usually followed, particularly for long journeys.
243

STATE HIGHWAY BOARD OF GEORGIA
MAPS 'l'he Board issues a map of the State Highway System showing new mileage accepted for maintenance, impro\'ements on old routes, and roads under construction with explanation of road types, State and United States route numbers and distances between county seats and principal junction points. On the back of the maps a mileage table is printed and a description of road under construction giving detour information. These maps are issued monthly and corrected to date of issue. The maps are much appreciated by the traveling public and continuous requests are made for copies by individuals. They are principally distributed however, to civic organizations, automobile associations, division offices, garages, filling stations, and others on the regular mailing list. The maps in the back of this report give the present mileage and the types of road on the State System. A comparison with the map included in the 1931 Report denotes much improvement in the System during 1932, thus confirming the deta:l of construction work performed which has already been submitted herein.
244

Proj . 138-A. Hancock-Warren, New Bridge on Right
Proj . 434. Clarke County Examining a Section of Test Road
245

Proj . 123. Grady County. Bridge widened from 18 ft. to 24 ft . Roadway
246

PART FIVE
OTHER ACTIVITIES, STATISTICS and
~1ISCELLANEOUS
INFORJ\:IATION

STATE HIGHWAY BOARD OF GEORGIA
WAREHOUSE
This branch of the Department is operated as an independent unit and its function is to supply the shop and Engineering Divisions with material, parts, and supplies with the least delay and at the lowest available prices. Consequently, a large stock of such items as are in constant demand, is carried; other items not in stock are ordered from Dealers or l\fanufacturers and handled by or in connection with the Warehouse. The Warehouse has recently increased its facilities for storing parts and supplies. Heavy commodities and supplies are bought in car lots at a substantial saving in price and time, over the old method of purchasing these bulky stocks separately from Dealers or Manufacturers upon requisition from the department in need.
All goods passing in or out of the warehouse are recorded on a perpetual card index system. These cards are verified by an almost continuous physical inventory of the goods actually on hand. The warehouse inventory for the Fiscal year being reported is included in the report of the Accounting Department among the first pages of this publication.
Warehouse sales are on a cost basis; the operating expense of the Warehouse is accounted for in Administration expense.
All purchases for the warehouse are made by the purchasing Agent upon requisition. Formerly purchases were made by the Warehouse Superintendent in connection with or in co-operation with the Purchasing Agent as noted in the previous Annual Report.
During the current Fiscal Year over a quarter million dollars worth of materials, supplies, tools, and parts, were handled by the Warehouse. All were for Departmental use as no purchases are made for resale to outsiders.
248

STATE HIGHWAY BOARD OF GEORGIA
HIGHWAY MAGAZINE This periodical is issued monthly by the Board and is Edited by a man of experience in Editorial work and an enthusiast in highway development. 'fhe name of the publication is "Georgia Highways" and it not only records the monthly advancement in construction and engineering activities, but contains many beautiful illustrations from photographs taken in different sections of the State. It has been said "the picture of one piece of improved highway looks just like the picture of another piece of improved highway" but, while true as a concrete proposition, the surroundings give beauty and charm to the improved highway as much as the appearance and riding qualities of the road itself. "Georgia Highways" naturally is devoted to the interest of the traveling public, to the interest of technicians and students in engineering and construction and is much sought after not only by the public but by employees of the State Highway Department who receive much valuable information, o:ome of which is reproduced from the Government Bulletin of the Bureau of Public Roads at Washington. Other articles are obtained from experienced road builders and engineers in this and other States. The map printed on the back of the magazine is changed periodically to reflect the improvements in road construction. The magazine has a wide distribution, not only in Georgia but in other States, some nearby and some remote. While there are a number of subscribers, anyone may secure a copy by request.
249

STATE HIGHWAY BOARD OF GEORGIA

TRAFFIC COUNT

AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH

EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS

DIVISION ONE
-

- - - - - - - - ---- ----------- - -

I I I AVERAGE NO. VEHICLES-7 DAYS AVERAGE PER DAY
-RN-toe-.. -~--C-ou-n-t-y ----~-------R-oa-d---------I-P-aG-sas-.en-g-Feor~rC-eia-gr-ns\-~G-aT.-r~u!~cFko-sr-ei-gn-\-DH-roa~rws~en~~PC-aas-rss'~r~~Tr~u~c~ks~D~Hr~oar~ws~en

1 Walker_ ______ 1chattanooga-LaFayette ___ ----1 2,480

1 Chattooga_ __ LaFayette-Summerville

__ 2, 748

1 Floyd____ __ 1 Floyd_____

__1SRuommme-eCrveidlaler-tRowomn_e______

_

1 1

2,293

1,804

1 Polk______ _Cedartown-Buchanan ___ .

1,643

1,348 617 294 168 177

4581 440 412 549 293

197 87 58 35 33

1 Carroll___ __ Carrollton-Franklin__

2 Walker___ _LaFayette-Dalton

2 Murray__

_Dalton-Chatsworth _

2 Fannin__ __ B. Ridge-Blairsville____

3 Catoosa _

1\Ringgold-Dalton_ _

3 Whitfield_

Dalton-Calhoun__ _

3 Bartow___

Calhoun-Cartersville

3 Cobb_

,Cartersville-Marietta

3 Cobb

Marietta-Atlanta_

3 Clayton_ __Atlanta-Jonesboro_

5 Gilmer_ ______ B. Ridge-Ellijay___

1,139
802 1, 621 1,514
2, 715 2,606 3,119 _ 5,925 14,520
10,385 1. 1,278

41 69 108 391
3,195 2,604 2,464
3,000 2, 717 2,477
140

232 643 165 735
449 337 527
1,0031 2,131 1,822
287

9 9 10 37 334 312 289 394 538 244 29

5 Pickens _______ Ellijay-Jasper___

5 Cherokee ______ Jasper-Canton__

5 Cherokee_ _Canton-Marietta

6 Polk__ _ __ _ \Dallas-Cedartown

8 Cobb______

Atlanta-AustelL______ __

8 Douglas__ _Austell-Douglasville_ _ _

8 Haralson_

1]Douglasville-Bremen____

1,723
2,415 2,572 2,224 2,521
3,935 1,536

192

301

137

421

182

408

259

309

127

506

379 1,040

294

307

16 31
3 96 17 54 28

32

547 93

126

481 75

58

369 67

29

282 83

42

260 47

173

169 35

43

124 93

22

247 25

33

272 110

41

844 112

34

744 93

96

797 117

61 1,275 157

21 2,462 381

12 1,837 295

92

202 45

83

274 45

71

365 65

34

398 59

137

355 58

30

376 75

79

616 156

125

261 48

5 18 8 4 6 25
6 3 5 6 5 14 9 3 2 13 12 10 5 19 4 11 18

----------------~----~----~------------~----

STATE HIGHWAY BOARD OF GEORGIA
TRAFFIC COUNT
AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932---3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS
DIVISION ONE (Continued)

Rte. No.

County

Road

I I AVERAGE NO. VEHICLES-7 DAYS AVERAGE PER DAY

Passenger Cars\ Trucks I Horse Pass'r

Horse

Ga. !Foreign Ga. !Foreign Drawn Cars Trucks Drawn

8 Haralson __ ---- Bremen-Ala. Line __ ---

-

1,304

426

327

58

114

247 55

16

8 CarrolL_ __ Carrollton-Ala. Line ____

3,922 132 368 46

92

579 59

13

14 Fulton _____ --- Atlanta-Fairburn ___

ll ,062 1,108 2,180 97

49 1,740 325

7

16 20
20

CarrolL_ ------ Carrollton-Newnan _____ Floyd _____ ---- Cartersville-Rome __ Floyd _____ __ Rome-Ala. Line __ ---

--
--
-------

1,184
3,028 547

84 707 170

193 424 116

4 57 57

107
50 21

181 27 534 69 103 25

15
7 3

48 Chattooga _____ ummerville-Ala. Line_

919

349

196

99

56

181 42

8

53 Pickens_ __ ____ Dawsonville-Tate __ .. ----

- 1,233

73

171

9

36

185 26

5

53 Pickens _______ Jasper-Fairmount_ ___

----

1,161

139

212

18

270

186 34

39

53 Gordon ____ _ Fairmount-Calhoun __ -----

1,063

74

184

8

116

162 27

17

53 Floyd_____ _ Calhoun-Rome ______

-

4,299

329

638

49

39

661 98

6

53 Floyd ____ ----- _Rome-Ala. Line _____

1,575

681

361 126

62

322 70

9

58 Dade ____ - _ Chattanooga-Birmingham ---

817 1,616 208 422

14

348 90

2

61 Murray_________ Tenn. Line-Chatsworth__

-- 1,014

413

237

97

124

204 48

18

61 Gordon ____ Chatsworth-Fairmount __

470

86

82 10

40

79 13

6

61 Bartow__ ----- Fairmount-Cartersville___

--

994

98

381

35

47

156 59

7

STATE HIGHWAY BOARD OF GEORGIA

TRAFFIC COUNT
AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-~3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS

DIVISION TWO

---

---

-

~--

Rte. No.

County

Road

AVERAGE NO. VEHICLES-7 DAYS AVERAGE PER DAY

Passenger Cars[

Trucks

I Horse Pass'r I

I Horse

Ga. !Foreign Ga. !Foreign Drawn Cars Trucks Drawn

2 Towns _____ - ~ Blairsville-Hiawassee_

2 Towns ____

_Hiawassee-Clayton __

661 439

8 Gwinnett ___ __ Lawrenceville-Decatur_~

8 Gwinnett ___ _Lawrenceville-Winder ____ ---

8 Barrow___

- ~ - Winder-Athens ____ ---

-- ~

---.

7,177 4,088 3,074

8 8 9 9 9 10 10 10
lO 10 ll
ll ll
ll ll
ll

Madison ___

Athens-Danielsville _____ -----

~--

Hart_ ___

~ _ Danielsville-HartwelL_

Forsyth __

Alpharetta-Cumming ____
-----

----

Forsyth ____ Cumming-Dawsonville ____ -----

Lumpkin_

Dahlonega-Blairsville _____ -- ---- -

DeKalb ___ -- _~ Decatur-Monroe __ Walton __ ~ -- Monroe-Athens ___ 0 glethorpe ___ _Athens-Lexington ___

~--
- - - - - -
---

Oglethorpe _____ Lexington-Washington __ ---

Wilkes ____ ----- Washington-Thomson ___ ---. -

Newton ____

Monticello-Covington ___ ----. --

Walton ________ Covington-Monroe ____ -- --- - -

Walton_ --- -- ~ Monroe-Winder __ --- -Barrow_________ Winder-Jefferson ___ --

------

Jackson ________ Jefferson-Gainesville ____ -- - ----

White __________ Gainesville-Cleveland ____________

2,925 2,745 1,020 1,070
655 5,076
915
1,893 827
1,157 863
1,252 789
1,353 1,361 1,129

152 129 1,597 664 480 580 465 35
17 41 685
86
195 130 187
60
109 34 143 94 120

214 221 1,079 616 403 473 346 538 378 221 935 168 385 234 161 231 252 169 214 125 241

70 21 318 57 38 72 100
3 2 2 16 7 32 14 19 7 48 3 ll
2
lO

94

116 41

61

81 34

37 1,253 200

63

679 96

45

508 63

314

501 78

15

459 64

45

151 77

68

155 54

40

79 32

25

823 136

65

143 25

43

298 60

46

137 35

40

192 26

57

132 34

93

194 43

7l

118 25

126

214 32

87

208 18

53

178 36

13 9 5 9 6 45 2 6
lO
6
4 9
6
7 6 8 13
lO 18 12
7

STATE HIGHWAY BOARD OF GEORGIA
TRAFFIC COUNT
AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS
DIVISION TWO (Continued)

Rte. No.

County

Road

I I AVERAGE NO. VEHICLES-7 DAYS AVERAGE PER DAY

Passenger Cars] Trucks I Horse Pass'r

Horse

Ga. !Foreign Ga. [Foreign Drawn Cars Trucks Drawn

11 11 12

Union _________ Cleveland-Blairsville ____ Union __________ Blairsville-N. C. Line __ DeKalb _________ Decatur-Conyers _____

- ----
--

660 1,027 7,130

179

134

281

254

377 1,466

35 RO 56

7

120 24

45

187 4R

24 1,072 217

1 6 3

12 12

Rockd Morga

nal_e_________-_-_-

Conyers-Covington________ Covington-Madison _____ -

---- --

3,262 2,053

299 265

685 497

33 87

31 180

509 102 331 83

4 26

12 Greene _________ Madison-Greensboro ___ ----- 1,458

167

277

13

65

232 41

9

12 Taliaferro ______ Greensboro-Crawfordville_____

852

115

155

7

96

138 23

14

13 Walton _________ Monroe-Lawrenceville _____ ---. - 1,249

43

248

6

132

185 36

19

13 13

HalL ___ HalL _____

--_-__-

Lawrenceville-Gainesville ___ Gainesville-Cornelia _______ ------

6,477 4,161

1,600 1,304

1,206 677

241 92

31 1,154 207

26

781 100

4 4

13 Habersham _____ Cornelia-Toccoa ___ ---- . -----

1,746

870

336

51

45

374 55

6

13 ----- -------- Atlanta-Buford-via Norcross_

1,095

54

216

4

72

164 31

10

15 Greene _____ __ Sparta-Greensboro __

- -----

-

977

64

211

9

139

149 31

20

15 Greene _____ ---- Greensboro-Watkinsville _____ -- 727

25

163

7

83

107 24

12

15 Clarke______ __ Athens-Jefferson ____________ ---- l ,928

79

264

2

120

287 38

17

15 Jackson __ --- _Jefferson-Commerce ________

1,912

95

264

6

72

287 39

10

15 Banks ______ --- Commerce-Cornelia _____ --- - 1,150

80

132

30

163

176 23

23

15 Habersham _____ Cornelia-Clarkesville ----- ----- 4,321

442

792

30

118

680 117

17

17 Wilkes ___ --- Washington-Elberton ____ --- ---

751

51

153

12

72

115 23

10

17 Elbert ____ ----- Elberton-Royston ___ -- ---- --- 1,697

131

416

13

145

261 61

21

17 Stephens___ __ -!Royston-Toccoa__________________ 1,456

282

231

70

236

248 43

34

STATE HIGHWAY BOARD OF GEORGIA

TRAFFIC COUNT

AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS

---

--

Rte. No.

County

-

--

Road

DIVISION TWO (Continued)

-

--

----

-- -

-

-- -

--

AVERAGE NO. VEHICLES-7 DAYS

Passenger Cars\ Trucks I Horse
Ga. !Foreign Ga. IForeign Drawn

---

--

----~

AVERAGE PER DAY

I Pass'r

I Horse

Cars Trucks Drawn

I 17
20

White _____ -Forsyth_ ---

Clarkesvill e-Cl_eveland____ _ Buford-Cumnnng. ______

- --
--

24 Morgan ____ _ Eatonton-Madison __ ... _

- --

24 Oconee ____ __ Madison-Watkinsville ____ ---

36 36
43 47

Madison ________ Commerce-Danielsville ___ --.

Elbe Lum

rt __ pkin

- --
__

-

---_

Danielsville-Elber Dahlonega-Gaines

to vi

n ________ lle _____

-
---

Wilkes ____ __ Washington-Lincolnton __ --- .. --

47 Lincoln __ . -- -- Lincolnton-Appling ____

-. -

53 Jackson ____ . __ Winder-Gainesville. _

---

53 HalL_

_ Gainesville-Dawsonville __
----

-

53

Dawson ___

D a w s o n v i l l e - T a t e ____
---

59 Franklin __ ---- Commerce-Carnesville __

--

77 Hart_____

_ Hartwell-Elberton _____

77 Oglethorpe _____ Elberton-Lexington_

-

77 Oglethorpe ______ Lexington-Union Point _____

79 Elbert_

_Elberton-Lincolnton __

--

81 83

Newton _________ Covington-McDonough ___ -Morgan ______ __ Madison-Monticello _____

568 1.235 1 :o15 1,406
902 1,680
783 784 857 644 902 517 623 904 713 700 296 1,267
283 I

82
43 326 159
65 150
78
19 51
38 68
4 71
79 100 27
68 18
22

92 224
240 225
327 196 297
239 266 119
285 108
107 89
155 158 79
260 69

4
3 46
11
23 19 1
9
7 7 7 1
13 8 9 2
34
0 2

72 14.8 34 45
101 125
60 188
105 60 164
30 117 240
75 79
166 176
36

93 14 183 32 192 41 223 38 138 50 261 31
123 43 115 35 130 39 97 18 139 42 74 16 99 17 140 14
116 23 104 23 52 16 184 37 44 10

10 21 5
6 14
18 9
27 15 8
23 4 17
34 11 11
24
25 5

STATE HIGHWAY BOARD OF GEORGIA
TRAFFIC COUNT
AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS
DIVISION THREE

R te. N o.

County I

Road

AVERAGE NO. VEHICLES-7 DAYS AVERAGE PER DAY

Passenger Cars]

I Trucks I Horse Pass'r

I Horse

!

Ga. !Foreign Ga. !Foreign Drawn Cars Trucks Drawn

---

1 !IHeard __

__ .Carrollton-Franklin __

1,099

I
26 I 272 I

I

5

79

I

161 40

11

1 Heard_

---- Franklin-LaGrange ___

1 Meriwether__ __ LaGrange-Chipley ___

- -[

1 '711 82

85 i 347 ! 4

I 7
0

I
I

75 8

257 13

51 1

11 1

1 Harris ____ ---- Chipley-Hamilton __ ----

965

1707 I 250

11 I 52

149 3'i

7

1 Muscogee ____ Hamilton-Columbus__

5,064

576 I 1,115

26

165

806 163

24

1 Muscogee _____ Fort Benning _____

----

1 Muscogee ______ Columbus-Cusseta ____

--

9,168 1, 760 I 1,469

2,523

405

540

105 141

I

9 39

1,561 225 418 97

1 6

1 Chattahoochee Cusseta-Lumpkin ___

608

52

182

8

8

94 27

1

3 Spalding ___ --- Atlanta-Griffin ____

-- -- 8,160 2,283 1,586 305

38 1,492 270

5

3 3 3

P i k e ___ Taylor_ ____ Schley ______

-

-
_
---

Griffin-Thomaston ___ Thomaston-Butler_ __ Butler-Ellaville - ----

-----

-

3,465 837
2,009

244 94 176

626 237 330

17
10 20

178 23 59

530 92
133 35 312 50

25 3 8

3 Schley____ _:Ellaville-Americus ____

1,912

135

384

14

50

292 57

7

7 Spalding ______ !Griffin-Barnesville _____

5,628 2,246 1,118 186

77 1,125 186

11

7 Lamar___ _-!Barnesville-Culloden_ ____ -

973

169

246

22

70

163 38

10

7 Crawford _____ Culloden-Roberta ________

-- 2,145

227

522

20

81

339 77

12

7 Crawford ____ _ Roberta-Fort Valley____ --

2,178

232

518

19

84

344 77

12

7 Dooly ____ _____ Perry-Vienna _________ ----- --- ' --- 5,231 1,936 1,121 268

242 1,024 198

35

11 Jones ____ --- Monticello-Gray____ - -----

11

Jones _____

Gray-Macon _________

-----

-----

-

-

I

1,046 4,583

25 248

218 777

7 34

14 46

153 32 690 116

2 7

I 11 Houston ___ - Macon-Perry_________ --- - ----- 4,438 2,686 1,2EO

I 313

10

I

1,018 228

1

STATE HIGHWAY BOARD OF GEORGIA
TRAFFIC COUNT AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH
EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS
DIVISION THREE (Continuedl

Rte. No.

County

Road

AVERAGE NO. VEHICLES-7 DAYS Passenger Cars\ Trucks I Horse

Ga. !Foreign Ga. !Foreign Drawn

-l-l-'=H=-o_u_s--ct_o_n________~~P:o-e_r_r_y_-""H;:-a-w---,kccic-n-s-vc-;ilc-le-_--_---_-__-_-_-_-'---2"-,5::c3=-=8c-'----:2~4~4~--~552

20

29

I I AVERAGE PER DAY

Pass'r

Horse

Cars Trucks Drawn

397 82

4

11 Pulaski__ _____ Hawkinsville-Abbeville__ _ _ ___ 1.716

168

333

20

142

269 50

20

14 Coweta____ _ Atlanta-Newnan ____ __ ___ _ __ 4,759

825

671

23

14

798 99

2

14 14

Coweta___ _ Troup _______

1LNaeGwrnaanng-eL-aWGersatnPgoein_t____

__

___ _

3,089 2,910

534 l ,180

441 541

43 95

17 89

518 69 584 91

2 13

16 Coweta ______ Carrollton-Newnan____ __

2,335

115

457

9

66

350 67

9

16 Coweta ________ 1Newnan-Sharpsburg__

_

373

5

79

0

71

54 11

10

16 Coweta _________ Sharpsburg-Griffin______ __ _ __ 1,738

118

369

7

113

265 54

16

16 Butts ________ Griffin-Jackson________ _ __ 1,814

56

231

2

137

267 33

20

16 .Jasper_ _______ .Jackson-Monticello_______ ___

508

5

214

l

54

73 31

8

16 .Jasper_ _________ Monticello-Eatonton_____ _ ___

388

18

135

2

66

58 20

9

18 Pike_____

__ Barnesville-Greenville____ _ ___ 3, 780

215

617

8

151

571 89

21

18 Meriwether_ ____ Greenville-Chipley_________ ___ l, 757

274

221

14

44

290 33

6

19 Bibb ________ Forsyth-Macon__________ __ ____ 4,296 2,034 1,004 259

15

904 180

2

19 Bibb__________ Macon-Jeffersonville_____

___ 3,692

92

824

l

77

541 118

11

22 Jones __________ Milledgeville-Gray___ _ ______ 3,160

243

482

17

25

486 71

3

22 Bibb____________ Macon-Knoxville___________ _ _ 3,473

159

542

22

88

519 81

12

22 Crawford _______ Knoxville-Roberta______ _____ ___ 2,078

119

507

lO

89

318 74

13

22 Taylor_ ________ Roberta-Talbotton___________

485

91

115

4

16

82 17

2

22 Talbot __________ Talbotton-Geneva______________ _

993

176

274

8

28

153 40

4

22 Muscogee _____ Geneva-Columbus_____ ___ _ ____ 4,208

372

898

18

93

654 131

13

26 Marion ________ Cusseta-Buena Vista_______ _ ___ 905

137

159

6

84

149 21

12

26 Schley________ Buena Vista-Ellaville_ _______ __ 2,368

207

423

19

69

225 63

10

26 Macon_____ _ ___ Ellaville-0 glethorpe _______________-_-----'--_4_6_1_ _ _2_9__c___9_2___:__ _2_ _ _4_7_ _ _ _70___13_ _ _ _7__

STATE HIGHWAY BOARD OF GEORGIA
TRAFFIC COUNT AVERAGE TOTAL VEHICLES FOR JAN.~APR.-JULY 1932--3 AND 4, 12 AND 13, 21 AND 22 AND 30TH
EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS DIVISION THREE (Continued)

Rte. No.

County

Road

- - - - ~-:-----=:-c;---;-;-

26 PulaskL

jOglethorpe-Hawkinsville_

26 PulaskL

~Hawkinsville-Cochran

27 PulaskL _

!Hawkinsville-Eastman

28 Pulaski___

_Hawkinsville-Vienna_

34 Heard_

Newnan-Franklin

34 Heard___

Franklin-Ala. Line ___ _

41 Coweta___

Newnan-Greenville._

41 TalboL ___ Greenville-Talbotton__

41 TalboL_

Talbotton-Geneva __ _

41 Marion__

Geneva-Buena Vista ___ _

41 Meriwether_ ___ Greenville-Warm Springs __

42 Butts__ _

Jackson-McDonough_

49 Houston

Echeconnee-Ft. Valley _

49 Macon.__

_ Ft.Valley-Oglethorpe__

49 Macon___

_ 0glethorpe-Americus___ _

54 Fayette

_ Jonesboro-Fayetteville _

54 Fayette __ _ Fayetteville-Fairburn_ 1

55 Chattahoochee IIC'usseta-Richland_ _

72 Upson__

_ Barnesville-Thomaston__

74 Upson__ _ Culloden-Thomaston __

74 Upson______ __Thomaston-Greenville __

83 Jasper__

_Monticello-Madison ___ _

85 Harris _

Warm Springs-Columbus

87 Bibb__

Macon-Cochran _

90 Dooly ____

New Road to Montezuma

1--- AVERAGE NO. VEHICLES- 7 DAYS

Passenger Cars

Trucks 1 Horse

_ Ga._ IForei~~~ _ 'Foreign, Drawn

8,020

472 1,262

30

117

1 ' 552

.58

344

5

117

2,130

97

395

2

247

3 ,017

102

460

11

177

1.379

56

197

10

66

731

77

182

14

48

2. 988

P65

:367

32

61

2,004

89

514

3

115

_ __ :

376

32

123

5

26

I 513

20

84

:3

83

2,300

203

239

8

38

1 '218

23

137

3

46

1,963

514

387

56

4

4,610

274

666

24

427

622

33

102

1

21

4,609

73

753

1

267

2 ,03.6

18

322

0

122

1,983

179

373

24

41

3,064

124

509

34

86

1,366

27

215

7

104

l '605

46

2:37

8

88

2' 155

367

466

53

163

1. 681 2,391

88

301 I 2

119

31

426

7

132

1 632

72

362

21

195

AVERAGE PER DAY

Pass'r Cars

I

I Horse

I Trucks Drawn

1,213 185

17

230 50

17

318 57

35

446 67

25

205 34

9

115 .58

7

479 57

9

299 74

16

58 18

4

76 12

12

358 :w

5

177 20

6

354 63

1

698 99

61

94

15

3

669 108

38

293 46

17

309 57

6

455 78

12

199 32

15

231 35

13

360 74

23

253 43

17

346 62

19

243 -5-5- -

28

STATE HIGHWAY BOARD OF GEORGIA TRAFFIC COUNT
AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS
DIVISION FOUR

Rte. No.
4 4 4 4 4 lO 12 12 12 12 15 15 15 15 15 16
17 19 21 21 21 21 21 22 22

AVERAGE NO. VEHICLES-7 DAYS

County

Road

Passenger Carsl Trucks I Horse Ga. !Foreign Ga. !Foreign Drawn

Richmond _____ Augusta-Wrens____________ ___ 2,946 2,116

857 382

18

Jefferson _______ Wrens-Louisville ______________ _ 1,435 1,820 Jefferson _______ Louisville-Wadley______________ _ 1,585 1,793

302 206 562 313

45
so

EmanueL ______ Wadley-Swainsboro____ _________ _ 1,379 1,962

328 242

65

EmanueL ______ Swainsboro-Lyonf; _______________ _ 1,084 1,657

283 195

70

McDuffie _______ Thomson-Washington ___________ _ 1,446

215

216

86

129

Richmond ______ Augusta-Harlem_______________ _ 3,699

609

997

52

31

Columbia _______ Harlem-Thomson_. _________ _ 2,195

457

365

47

36

Warren ________ Thomson-Warrenton ____________ _ 1,196

216

217

19

38

Warren_________ Warrenton-Crawfordville _______ _ 766

152

165

26

76

Hancock _______ Greensboro-Sparta________ ___ 859

46

123

2

194

Hancock _______ Sparta-Sandersville _____________ _ 474

23

114

5

151

Washington ____ Sandersville-Wrightsville ________ _ 1,173

34

178

8

131

Johnson _______ Wrightsville-Dublin ____________ _ 925

81

77

5

129

Laurens_______ Dublin-Glenwood____________ _

958

43

315

5

138

Warren________ Warrenton-Sparta___________ _ 1,226

218

192

41

50

McDuffie _______ Thomson-Stapleton__ ___ ___

690

34

172

5

197

Twiggs _________ Jeffersonville-Macon__ _______ _ 1,504

140

395

10

27

Richmond ______ Augusta-Waynesboro____ _ _ __ _ 3,256

383

809

59

61

Burke __________ Waynesboro-Millen___ __ ___

737

131

187

46

346

Screven ________ Millen-Sylvania__ _ _________ ____ _ 550

49

92

3

68

Screven ________ Sylvania-Springfield_____________ _ 1,092

98

277

11

61

Effingham _____ Springfield-Savannah ____________ _ 2,010

209

369

38

175

Hancock _______ Sparta-Milledgeville_________ ___ _ 888

116

288

15

140

Baldwin________ Milledgeville-Gray _______________ _ 3,436

334

695

41

183

AVERAGE PER DAY

Pass'r I

I Horse

Cars Trucks Drawn

723 177

3

465 73

6

482 125

11

477 81

9

392 68

10

237 43

18

615 150

4

379 59

5

202 34

5

131 27

11

129 18

28

71 17

21

172 27

19

144 12

18

143 46

20

206 33

7

103 25

28

235 58

4

520 124

9

124 33

49

86 13

lO

170 41

9

317 58

25

143 43

20

539 105

26

STATE HIGHWAY BOARD OF GEORGIA TRAFFIC COUNT
AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932--3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS
DIVISION FOUR (Continued)

Rte. No.

County

Road

AVERAGE NO. VEHICLES-7 DAYS
Passenger Cars! Trucks I Horse

Ga. !Foreign Ga. !Foreign Drawn

23 23

Candler_ _____ Jenkins ______

_Metter-Reidsville_ ---_Millen-Graymont_ __ ---

-

----- - - - - -

309 455

65 61

90

7

99

16

24 90

23 Candler __ --- __Graymont-Metter_ ___ . ----------

774

46

325

5

113

24 Putnam ______ _ Madison-Eatonton ___ ------ ---- 1,325

157

354

16

160

24 Putnam ________ Eatonton-Milledgeville _____ --- 1,179

107

235

20

92

24 Washington ____ Milledgeville-Sandersville _________ 1,409

169

316

20

145

24 Burke __________ Louisville-Waynesboro ___________ 416

56

137

18

234

26 Laurens ____ --- Cochran-Dublin ________ --------- 405

45

45

3

34

26 Laurens ________ Dublin-Swainsboro_______________ 973

211

248

57

44

26 EmanueL ___ __ Graymont-Statesboro_

2,043

180

584

33

146

26 Bulloch ________ Statesboro-Savannah ______ ---- 1,881

200

530

15

55

29 Treutlen_ --- Soperton-Dublin ___________ ----- 585

31

125

3

60

29 Laurens ___

Dublin-Irwinton ____ . ____________ 841

26

246

4

89

29 44 46

Wilkinson ______ Jones __________ Candler ________

Irwinton-Milledgeville_______ ---Eatonton-Gray___________ ------Metter-Statesboro_____ --- -----

920 666 1,002

26

144

2

56

59

195

11

87

68

237

5

110

47 56

Columbia _______ Treutlen _______

Appling-Lincolnton __ -------- S o p e r t o n - N o r r i s t o w n _____________

409 783

22

158

15 221

3

20

2 276

56 EmanueL ______ Swainsboro-Midville ___ --- ------ 635

84 124 32 160

56 Burke --------- Midville-Waynesboro _____ --- --- 554

108

112

37

197

57 67

Wilkinson ______ Irwinton-Macon______ Jenkins ________ Millen-Statesboro ____

--- ------- -------

609 470

12 139 37 108

3 7

37 31

80 Glascock_ ----- Warrenton-Gibson ____ --- -- --- 122

16

36

1

33

87 87

Dodge__ _______ Twiggs _________

ECaoscthmraann--MCoaccohnra_n___________________-_-_-_-_-_-_-

759 647

302 28

266 134

69 2

97 30

AVERAGE PER DAY

Pass'r /

j Horse

Cars Trucks Drawn

53 14

3

74 16

13

117 47

16

212 53

23

184 36

13

225 48

21

67 22

33

64

7

5

169 38

6

318 88

21

297 78

8

88 18

9

124 36

13

135 21

8

103 29

12

153 35

16

61 23

4

114 32

39

103 22

23

95 21

28

89 20

5

72 16

4

20 5

5

151 48

14

96 20

4

STATE HIGHWAY BOARD OF GEORGIA
TRAFFIC COUNT AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH
EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS
DIVISION FIVE

P~=~ni;~r~t;~~~G~a_T Rte.

I I AVERAGE NO. VEHICLES-7 DAYS AVERAGE PER DAY

rucks

Horse Pass'r I

Horse

_N_o_.--'----C-o_u_n_t_y_________ Road_ _ _ _ _

!Foreign Drawn Cars Trucks Drawn

1 Stewart__

Cusseta-Lumpkin __

1 Stewart __ 1 Randolph_

Lumpkin-Cuthbert _ Cuthbert-Blakely ___

""0 ''

1 Early __ 1 Decatur_ l Decatur_ __

Blakely-Colquitt ___ _ Colquitt-Bainbridge ____
Bainbridge-Tallahassee __

3 3
3 3

Lee ___

__ Americus-Albany_ --

Mitchell __ --- Albany-Camilla ___

Thomas ___ __ Camilla-Thomasville___

Grady_ -- -- _Thomasville-Tallahassee ___

7 Turner ___

C o r d e l e - A s h b u r n ___

7 Tift ____

_Tifton-AdeL __
---

7 Cook_ --

Adel-Valdosta __ -- - -

7 Lowndes __ ll Berrien_____

_ Valdosta-Fla. Line _Alapaha-Ocilla ____

11 ll

Irwin __ -Ben HilL __

Ocilla-Fitzgerald __ --- Fitzgerald-Abbeville ___

28 Sumter_

Vienna-Americus_ -

28 Webster_ __ _Americus-Lumpkin __

28 30

Quitman __ Wilcox ____ --

-_~LAubbmepviklilne--GCoerodregleeto__w__n __

874 922
680 735 952
915 1,180 2,400
2,040 1,138 2,591
-I 1,666
-- 2,817 1,964 358 2,565 1,047 1,770 1,179 527 905

116 78
95 119 98 264
554 351
597 932
2,049
l ,911 2,116 2,622
27
151 83
270 37 302 63

26 3 14 l

I 27

91

5

154

11 9

ll

62

19 5

59

126

26 0

10

53

17 9

72

20

31 8

95

27

53 7

55

150

585 176

24

160 123

58

97 2 382

54

499 261

31

760 298

19

530 370

7

10 5

2

21

50 7

20

106

18 4

7

29

38 1

55

lll

25 l

5

133

12 5

51

33

20 9

8

81

141 41 143 21 111 19 122 36 150 39 168 36 248 59 393 85 377 109 296 40 663 193 502 109 705 151 655 129
55 15 388 75 161 27 291 62 174 37 118 25 138 31

13 22 9 18
8 3
4 21 3
8 8 4
3 l
3 15
4 16
19 5 12

STATE HIGHWAY BOARD OF GEORGIA

TRAFFIC COUNT

AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS

DIVISION FIVE(Continued)

-

---

--

-

-- - -

-----

------

---

Rte. No.

County

Road

AVERAGE NO. VEHICLES-7 DAYS AVERAGE PER DAY

Passenger Cars[ Trucks [ Horse Pass'r [

[ Horse

Ga. !Foreign Ga. !Foreign Drawn Cars Trucks Drawn

32 Irwin ____ - - Ocilla-Douglas _________ --- - -- -- 1,390

79

467

11

191

210 68

27

33 Worth_ ----- Sylvester-Moultrie ___ ----

---- 1,390

137

357

18

36

218 53

5

33 Colquitt ________ Moultrie-Quitman __

- 990

145

421

49

82

162 67

12

33 Brooks ____

Quitman-Fla. Line _____

------

820

517

342 131

85

191 68

12

35 Thomas ______ Thomasville-Fla. Line ____ ----

508

367

323

71

103

125 56

15

37 Tift_ _____ ------ Tifton-Moultrie ___

-- 1,391

165

519

30

70

222 78

10

37 Colquitt ____ __ Moultrie-Camilla ____ -- ---

1,253

150

508

71

78

200 83

11

37 MitchelL __ ---- Camilla-Newton __

--

- 969

52

364

9

104

146 53

15

37 Baker__ _ __ Newton-Leary_

--

- ----

811

89

408

36

95

129 63

13

37 Calhoun ________ Leary-Ft.Gaines _______ ---- --- -

962

75

389

13

104

148 57

15

38 Seminole _______ Ala. Line-Donalsonville___

868

364

310

95

57

176 58

8

38 Decatur________ Donalson-Bainbridge ___ - -- ---

1,681

217

325

15

70

271 49

10

38 Decatur_ _______ Bainbridge-Cairo___

- 2,024

223

388

53

110

321 63

16

38 Grady__ - - ---- Cairo-Thomasville__

- -

------

1,721

242

529

50

121

280 83

17

38 Brooks _________ Thomasville-Quitman ___

-- 2,226

815

855 260

247

414 159

35

38 Lowndes ____ _ Quitman-Valdosta_____ ------ 1,929

812

651 249

131

391 129

19

38 Lowndes _______ Valdosta-Homerville ____

----- 1,139

410

433

32

6

221 66

1

39 Clay_

-- - Ft. Gaines-Georgetown __ ------

525

146

85

42

71

96 18

10

45 Miller __

Colquitt-Arlington_______ ------- 627

78

130

30

281

101 23

40

EO Quitman_ -- _Georgetown-Cuthbert --

-- 1,084

726

231 128

83

259 51

12

50 Randolph_ ---- Cuthbert-Dawson ______ --------- 1,598

196

421

44

128

256 66

18

STATE HIGHWAY BOARD OF GEORGIA

TRAFFIC COUNT

AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS

---

------

DIVISION FIVE (Continued)

---

--

----~=~'-----~=

------

---- -

----

-

-

Rte. No.

County

Road

AVERAGE NO. VEHICLES-7 DAYS AVERAGE PER DAY

Passenger Cars[ Trucks I Horse Pass'r I

[ Horse

Ga. IForeign Ga. !Foreign Drawn Cars 'J rucks Drawn

50 TerrelL ___ ---- Dawson-Albany ________ -------- 1,768

214

365

46

66

283 59

9

50 Worth _____ - ---- Albany-Sylvester ____ --- ------- 2,221

281

602

88

187

357 99

27

50 Tift_ __ --- ---- Sylvester-Tifton___

--

- - 1,670

215

397

24

110

269 60

16

50 Berrien ____ ---- Tifton-Alapaha_____ ------- -----

437

42

131

6

7

68 20

l

55 Stewart _____ - Cusseta-Richland __ ------ ------ 1,430

195

325

31

86

232 51

12

55 62 65

Webster_ _______ Richland-Dawson ___ Early___________ Blakely-Arlington ___ Colquitt ________ Moultrie-AdeL ______

---- - -- -- -------------- - ---

1,487 616 758

170 98 56

350 135 321

25 24 8

82 74 80

237 fi3 102 23
116 47

12 11
ll

76 91

Brooks _________ Quitman-AdeL _________ Baker_ _____ -- Newton-Colquitt_

-----------

392 698

67

433

21

58

30

150

12

145

66 64 104 23

8 21

91 93

Miller_ __________ G r a d y __________

Colquitt-Donalsonville_ --------Cairo-Fla. Line __________ ----- --

758 252

132 66

221 31

59 13

367 10

127 40

45

6

52 l

STATE HIGHWAY BOARD OF GEORGIA

TRAFFIC COUNT

AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS

DIVISION SIX

---

-=-=- ___ -----~~~-~-

===---~-=-,--

--~-~---~

- - - - -=--=-=-~--~-=--=-=

Rte. No.

County

Road

AVERAGE NO. VEHICLES-7 DAYS AVERAGE PER DAY

I Passenger Cars\ Trucks I Horse Pass'r

I Horse

Ga. !Foreign Ga. !Foreign Drawn Cars Trucks Drawn

4 Toombs ________ Lyons-Baxley____________

___ 902 1,772

327 174

31

382 41

4

4 Bacon__________ Alma-Waycross________ _____ _ 1,612 1,865

522 249

16

497 110

2

4 Charlton______ Waycross-Folkston__ ____ ___ 892 1,871

428 257

11

395 98

2

15 Wheeler_ ______ Glenwood-Lumber City____ _ _ 581

52

258

2

52

90 37

7

15 Jeff Davis ______ Hazlehurst-Alma_______

____ _ 503

122

184

14

42

89 28

6

23 Mcintosh ______ Eutonia-LudowicL __ _____ _

237

20

98

1

10

37 14

1

23 Long ___________ Ludowici-Reedsville________ _ __ 609

71

124

18

47

97 20

7

25 Chatham_______ S.C. Line-Savannah _______ _

2,747 3,681

602 1,136

9

918 248

1

25 Liberty_________ Savannah-Midway____ ___ _

1,285 2,154

546 231

16

491 111

2

25 Mcintosh ______ Midway-Darien ___ _____ ____ _ 1,113 1,894 371 206

10

430 82

1

25 Mcintosh ______ Darien-Brunswick _____________ _ 1,729 2,291

550 339

1

574 127

1

25 Glynn __________ Brunswick-Woodbine ______ _

1,281 2,287

532 243

2

510 111

1

25 Camden________ Woodbine-Fla. Line _______ _

897 2,489

249 325

12

484 82

2

26 Bryan ___________ Savannah-Statesboro ________ _ 1,389

127

415

9

0

217 61

0

27 Telfair ________ McRae-Lumber City_ _____ _ __ _ 1,675

412

585 154

115

298 106

16

27 Appling ________ Baxley-Jesup ________ _

669

95

195

4

21

109 28

3

27 Glynn__________ Jesup-Brunswick___ _____ _____ _ 712

84

275

8

20

114 40

3

30 Wheeler_ _______ Alamo-Glenwood___ _ ____ _ 1,084

104

277

44

70

170 46

10

30 Montgomery ___ Mt. Vernon-Lyons _________ _ 1,221

185

341 122

108

201 66

15

30 TattnalL _______ Lyons-Reidsville____ _____ ____ _ 927

94

221

13

40

146 33

6

30 Bryan__________ Pembroke-Clyde_______________ _ 688

46

330

7

13

105 48

2

STATE HIGHWAY BOARD OF GEORGIA

TRAFFIC COUN1

AVERAGE TOTAL VEHICLES FOR JAN.-APR.-JULY 1932-3 AND 4, 12 AND 13, 21 AND 22 AND 30TH EQUAL 7 DAYS EACH MONTH-ALSO, DAILY AVERAGE, SAME MONTHS

--- ----

-- -

--

Rte. No.

County

-
Road

DIVISION SIX (Continued)

-

---

-

- ---

I AVERAGE NO. VEHICLES--7 DAYS

Passenger Cars\ Trucks

Horse

Ga. [Foreign Ga. [Foreign Drawn

I AVERAGE PER DAY

Pass'r \

Horse

Cars Trucks Drawn

31 Coffee

_Douglas-Pearson_

31 Atkinson _ _ Pearson-Lakeland ___

32 Coffee_

_ Douglas-Ocilla __

38 Liberty_

_ Midway-Hinesville_

38 Wayne --

_ Hinesville-Jesup_

38 Pierce __

_Jesup-Waycross ____

38 Ware __

Waycross-Homerville

38 Clinch____ __ Homerville-Valdosta __

40 Camden

Kingsland-St. Mary's __

50 Atkinson_ --- Alapaha-Pearson __

50 Ware ___

__ Pearson-Waycross _

50 Brantley ---[Waycross-Nahunta _

50 Glynn __

___ Nahunta-Brunswick ---

63 Bryan

_-~Pembroke-Blitchton ____

64 89

Appling Atkinson __

__ Reidsville-BaxleY:___ __ ___ Pearson-HomerVllle _____

I
--
-
-
--
--
-
---

522
287 982 906 742
3,239
1,080 1,079
485 867
954
989
1,000 867
75 224

49 12 121 68
95 262 504
392 111
110 126 134
155 44
8 14

189
65 300 377 302 742
354 340 182
207 311 328
425 413
5 64

8 9 24 16 11
18 32
39 48
25 26 18
26 2 1
13

50 15 40
19 6
103
12 13 19
38 25
3 2 2 2
14

82 28

43 11

158 46

139 56

120 45

500 109

226 55

210 54

85 33

140 33

154 48

160 49

165 64

130 59

12

1

34 11

7 2 6
3 1
15 2
2
3 5 4 1 1
1 1
2

-

State Forces Finishing a Bridge on Route No. 2, in Union County
State Forces Clearing Stumps for Highway Work on Route No. 11, in Lanier County 265

STATE HIGHWAY BOARD OF GEORGIA DISTRIBUTION OF ONE CENT GAS TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1931 AND JUNE 30, 1932

County

One Cent Gas

Miles on Tax Distribut-

State System ed Yr.Ending

at 6-3Q--31

6--3Q--31

Appling ___________________ A t k i n s o n __________________
Bacon______________ "______ B a k e r _____________________
Baldwin ___________________ Banks _____________________
Barrow_____ ~- _____________ Bartow____________________ Ben HilL __________________ Berrien ____________________ Bibb _______________________ Bleckley___________________ B r a n t l e y __________________ Brooks ____________________ B r y a n _____________________ Bulloch ___________________ Burke _____________________ Butts _____________________ Calhoun __________________
C a m d e n ___________________ Campbell __________________ C a n d l e r ___________________ CarrolL ___________________ Catoosa ___________________

62.715 $ 49.343 32.940 32.770 44.200 29.400 35.076 59.434 13.301
56.160 49.165 32.425 27.048 73.450 62.038 70.590 81.595 31.058 40.100 42.303 20.090 27.050 72.890 13.431

19,284.52 16,236.14 10,217.52 10,237.90 13,816.91 9,190.44 10,565.77 18,594.49 4,157.90 17,555.59 15,368.97 10,136.04 8,496.35 22,960.46 19,267.24 20,501.81 25,893.30 9,708.74 12,491.63 13,227.89 6,280.13 8,455.82 22,785.40 4,202.26

Percentage
of Total Mileage

One Cent Gas

Miles on Tax Distribut-

State S.Y!ltem ed Yr.Ending

at 6-3Q--32

6--3Q--32

.0087854 .0069124 .0046144 .0045906 .0061917 .0041185 .0049136 .0083258 .0018633 .0078672 .0068873 .0045422 .0037890 .0102892 .0086906 .0098886 .0114302 .0043508 .0056174 .0059260 See Fulton .0037893 .0102108 .0018815

62.715 $ 49.343 32.940 42.670 44.893 36.650 33.339 66.954 19.201 56.160 49.165 32.425 48.548 75.785 62.056 72.211 93.092 31.058 53.950 57.103 See Fulton 27.050 74.310 15.853

17,384.76 13,678.01 9,131.05 10,950.53 12,405.30 9,556.26 9,386.17 17,934.15
4,039.63 15,567.69 13,628.66 8,988.29 10,120.29 20,500.05 17,198.16 20,017.06 24,848.79 8,609.36 13,802.75 14,597.73 1,671.48
7,498.33 20,598.90
4,437.01

Percentage of Total Mileage
.0076511 .0060198 .0040186 .0052057 .0054769 .0044712 .0040673 .0081683 .0023425 .0068515 .0059980 .0039558 .0059228 .0092457 .0075707 .0088097 .0113571 .0037890 .0065818 .0069665 See Fulton .0033001 .0090657 .0019340

---------------

STATE HIGHWAY BOARD OF GEORGIA

DISTRIBUTION OF ONE CENT GAS TAX TO COUNTIES

FISCAL YEARS ENDING JUNE 30, 1931 AND JUNE 30, 1932

--

----

---- -

--

-

-----

--

-- -

--

--

---

County

One Cent Gas

Miles on Tax Distribut-

State System ed Yr.Ending

at 6-30-31

6-30-31

Percentage of Total
Mileage

One Cent Gas

Miles on Tax Distribut-

State System ed Yr.Ending

at 6-30-32

6-30-32

Percentage of Total
Mileage

CChhaarthltaomn ______________________-_-_-_-_-_-_-
Chattahoochee ___________ Chattooga ________________ C h e r o k e e __________________ C l a r k e ____________________ Clay_______________________
Clayton ___________________ C l i n c h ____________________ Cobb ______________________ Coffee______ .. ______________ C o l q u i t t ___________________
CCooolukm__b_i_a________________________-_-_-_-_-_C o w e t a ____________________ Crawford __________________ Crisp ______________________ Dade ______________________ Dawson ___________________ D e c a t u r ___________________ DDoeKdgaelb__________________________________-_-_-
DDoooulgyh__e_r_t_y______-_-_-_-_-_-_-_-_-_-_-_-_-

19.238 $ 58.316 37.840 32.483 41.799 30.570 37.411 28.610 67.811 52.797 33.156 77.880 34.000 44.470 74.490 45.320 41.651 24.100 32.384 54.392 33.837 48.490 45.515 24.827

6,013.79 18,481.55 11,828.77
10' 107.16 12,973.04 9,556.18 11,694.66 8,943.48 21,113.03 16,576.59 10,377.19 24,345.26 10,638.39 13,901.31 23,285.55 14,167.02 13,013.25 7,533.65 10,123.23 17,002.92 10,823.18
15' 157.96 14,227.97 9,408.08

.0026949 .0081692 .0053008 .0045504 .0058554 .0042824 .0052407 .0040078 .0094993 .0073961 .0046447 .0109098 .0047629 .0062696 .0104349 .0063487 .0058347 .0033760 .0045365 .0076195 .0047401 .0067927 .0063759 .0034778

43.838 $ 58.316 43.032 33.130 56.579 35.886 37.411 38.772 69.311 49.782 58.380 77.880 52.513 44.470 78.155 51.720 41.651 24.100 44.104 70.600 41.384 49.827 67.615 50.433

8,844.85 16,165.34 11,151.77 9,043.02 14,454.14 9,138.07 10,370.42
9' 141.56 19,088.38 14,441.85 14,084.44 21,588.53 10,492.62 12,327.19
21' 146.06 13,804.44 11,545.76
6,680.59 10,406.49 18,274.08 11,086.51 13,604.63 16,904.33 11,849.74

.0053482 .0071145 .0052498 .0040418 .0069026 .0043780 .0045641 .0047301 .0084559 .0060733 .0071223 .0095012 .0064066 .0054252 .0095348 .0063098 .0050814 .0029401 .0053806 .0086132 .0050487 .0060789 .0082489 .0061528

STATE HIGHWAY BOARD OF GEORGIA

DISTRIBUTION OF ONE CENT GAS TAX TO COUNTIES

-~

-

FISCAL YEARS ENDING JUNE 30, 1931 AND JUNE 30, 1932

--

-~

-~

-- --

--

--- -

-

One Cent Gas

Miles on Tax Distribut-

State System ed Yr.Ending

County

at 6-30-31

-------------- ---------

6-30-31

Douglas_ E a r l y __ Echols ________ Effingham ____

-- -- ~

--

---

--

18.640 $ 55.900 26.800 35.000

5,826.86 17,474.32
8,377.67 10,940.99

Elbert_ EmanueL__ _ _

74.100 107.257

20,766.45 33,528.51

Evans ___

20.578

4,683.77

F a n n i n ___

45.008

10,257.39

Fayette ___ ~

23.610

7,380.49

F l o y d ______

78.997

24,694.44

Forsyth_

- --

28.300

8,846.57

Franklin __

-

Fulton __

51.540 7.790

16' 111.39 5,096.09

Gilmer ____

35.372

11,057.28

Glascock_

-

Glynn __

- ---- --

Gordon _____

----

G r a d y _____

--- --

Greene _____

-- -- --

Gwinnett_ --

--- ---

Habersham ____

14.375 53.804 56.245 56.020 60.300 72.470 39.570

4,493.19 16,762.29 17,562.53 17,511.84 18,849.76 22,654.10 12,369.58

HalL _____

76.454

23,899.50

Hancock__ __

62.800

19,631.26

Haralson___ --

- -- -

34.711

10,892.74

One Cent Gas

I Percentage

Miles on Tax Distribut-

of Total State System ed Yr.Ending

Mileage

at 6-30-32

6-30-32

Percentage of Total Mileage

-~

.0026112 .0078307 .0037543 .0049029 .0103803 .0150251 .0028827 .0063049 .0033074 .0110663 .0039644 .0072200 .0053064 .0049551 .0020137 .0075371 .0078791 .0078426 .0084471 .0101520 .0055432 .0107101 .0087973 .0048625

22.975 $ 69.440 55.500 34.454 74.952 118.757 20.578 45.008 23.610 88.367 37.390 60.840 78.582 51.759 25.975 53.792 56.245 56.020 60.300 94.020 53.870 75.887 62.800 36.065

6,083.90 17,147.20 12,996.91
9,669.45 20,754.05 30,419.10
5,704.28 12,476.33
6,544.75 23,041.09 9,608.30 14,842.75 17,489.23 11,804.04 4,677.95 14,913.88 15,591.25 15,528.88 16,715.32 24,269.62
13' 743.15 21,159.36 17,408.31 9,702.89

.0028029 .0084716 .0067709 .0042033 .0091441 .0144881 .0025105 .0054909 .0028804 .0107807 .0045615 .0074224 .0095869 .0063145 .0031689 .0065626 .0068618 .0068343 .0073566 .0114703 .0065720 .0092581 .0076661 .0043998

STATE HIGHWAY BOARD OF GEORGIA DISTRIBUTION OF ONE CENT GAS TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1931 AND JUNE 30, 1932

County

One Cent Gas

Miles on Tax Distribut-

State System ed Yr.Ending

at 6-30-31

6-30-31

Harris ___ ----------

Hart_ ___

-- ---------- --

Heard ___

H e n r y __

Houston ___

Irwin ___

gsi\:)

Jackson __ Jasper_ ____

Jeff Davis Jefferson ___

--- ------

Jenkins __ -Johnson ____

Jones ____

Lamar_ ___

Lanier_ ___

Laurens ___ Lee _____

L i b e r t y ___

Lincoln ____

Long ___

Lowndes ___

Lumpkin Macon _____

Madison __

43.560 $ 48.690
39.170 44.950 63.850
42.480 58.340 60.250
24.836
90.000 40.000
30.716 50.109
32.380 40.820
75.823
26.900 34.734
32.600 4f1.263
74.690
46.200 51.600 58.950

13,616.84 13,174.10 12,244.52 14,051.36 19,953.42 13,279.23 18,151.54 18,834.14 8,214.40 28,133.97 12,503.99 9,601.82 15,770.01 10,121.98 13,167.02 23,702.26 7,127.55 10,873.27 10,190.75 14,298.18 23,348.08 14,442.10 16,130.15 18,427.76

- - - - - - - - - - - - - - - - - - -----~-

Percentage of Total Mileage
------
.0061021 .0068208 .0054871 .0062968 .0089444 .0059508 .0081726 .0084401 .0034791 .0126077 .0056035 .0043028 .0070195 .0045359 .0057183 .0106217 .0037683 .0048657 .0045668 .0063407 .0104619 .0064719 .0072284 .0082580

Miles on State System
at 6-30-32
43.560 57.940 45.570 44.950 63.850 46.230 72.003 60.250 24.806 101 ,<100 56.095 58.736 60.809 34.271 40.820 92.627 28.017 34.734 39.400 45.263 74.690 58.349 54.957 76.750

One Cent Gas Tax Distributed Yr.Ending
6-30-32
$ 12,074.94 15,291.52 11,638.69 12,460.25 17,699.38 11,999.65 17,838.57 16,701.45 6,878.78 27,159.85 13,966.04 10,207.51 15,561.43 9,206.48 11,315.41 24,561.56 7,593.00 9,628.34 10,921.77 12,547.01 20,704.25 14,303.00 15,073.25 17,404.74

Percentage of Total Mileage
.0053143 .0070686 .0055595 .0054838 .0077896 .0056400 .0087843 .0073504 .0030263 .0123706 .0068435 .0071658 .0077846 .0041810 .0049800 .0113003 .0034181 .0042375 .0048067 .0055220 .0091121 .0071185 .0067046 .0093634

STATE HIGHWAY BOARD OF GEORGIA

DISTRIBUTION OF ONE CENT GAS TAX TO COUNTIES

FISCAL YEARS ENDING JUNE 30, 1931 AND JUNE 30, 1932

--~=---~=c~-~-~-=-=-- _ _ _-_ _- _- -_ _ _- - - - _ -_ _ - ~---_ -

_ _ c_~-~~c==~~~c

---~=~~~~~~-~~ - - - _ - - _ - - - - - -

County

One Cent Gas

Miles on Tax Distribut-

State System ed Yr.Ending

at 6-30-31

6--30-31

Percentage of Total
Mileage

One Cent Gas

Miles on Tax Distribut-

State System ed Yr.Ending

at 6--30-32

6-30-32

Percentage of Total Mileage

Marion__ _ _ ___________ _

McDuffie___

_____ _

Mcintosh _____________ _

Meriwether_____ ____ _

Miller_ _________________ _

Milton____ __________ _

2"l"MMiotcnhroeleL________________________________

Montgomery _________ _

Morgan_______________ _

Murray___ _ _____ _______ _

Muscogee____ ________ _

Newton _________________ _

Oconee _________________ _

Oglethorpe____________ _

Paulding ___________ _

Peach_ _____ _____ __ __

Pickens ______________ _

Pierce _ _ ___________ ___ _

Pike_____ ____ __ _______ _

Polk_______ ____ _______ _

Pulaski___ _____ ____ _

Putnam ______________ _

Quitman _________________ _

34.550 $ 41.206 33.006 55.250
46.380 10.000 54.946
43.640 23.395
51.500 51.616 5C .476
40.180 37.260
58.500 20.854 30.519 44.821
21.896 38.931
40.692
54.685 58.800 36.660

10,800.33 12,880.47 10,301.76
17,434.85 14,618.12 3,126.00
17' 176.11 13,616.20 7,303.68
16,098.89 16,126.32 15,778.78
12,560.26 11,647.46 18,287.08
6,481.31
9,007.25 14,034.19 6,843.29
12,087.74 12,853.62 16,885.92
18,380.86 11,459.92

.0048399 .0057723 .0046236
.0077397 .0064971 See Fulton .0076971
.0061133 .0032773
.0072284 .0072306
.0070709 .0056286 .0052196 .0081950
.0029216 .0042752
.0062788 .0030673
.0054537 .0057003 .0076606
.0082370 .0051355

34.550 $ 40.629 33.006
56.702 46.380 See Fulton 74.146
56.923 47.395
51.392 51.616 64.214
40.429 37.260 58.500
54.377 30.090
42.080 21.896 38.942
49.972 55.236
58.790 36.660

9,577.35 11,310.46 9,149.33
15,492.55 12,856.66
832.00
18,956.02 13,744.93 9,288.61 14,254.98
14,308.08 15,667.80
11' 168.37 10,328.56 16,216.34
12,271.95 8,407.63
12,260.70 6,069.62 10,793.88
12,411.88 15,265.71
16,298.29 10,162.24

.0042151
.0049567 .0040267 .0069175 .0056583
See Fulton .0090457 .0069445 .0057822
.0062697
.0062971 .0078340 .0049323
0045457 .0071369
.0066339 .0036710
.0051337 .0026712 .0047509
.0060965 .0067387 .0071723
.0044725

_ _ -

-------

STATE HIGHWAY BOARD OF GEORGIA DISTRIBUTION OF ONE CENT GAS TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1931 AND JUNE 30, 1932

County

One Cent Gas

Miles on Tax Distribut-

State System ed Yr.Ending

at 6-30-31

6-30-31

Rabun______ __________ _

Randolph___________ _

Richmond___ _

Rockdale _____ _

Schley____ _______ _

Screven __ _

1\:l Seminole __ -1 Spalding____

_ __ _

...... Stephens____ ___ _____ _

Stewart____ ___ _

Sumter_ ______ __

Talbot _________ _

Taliaferro_ ______

_ _

TattnalL_ ____

___

Taylor_ ________________ _

Telfair____ ___ ____ ___

TerrelL__

_ ____ _

Thomas _______________ _

Tift_ __________ __________ _

Toombs_____________ ___

Towns_____ __ . ____ _

Treutlen _______________ _

Troup ___________ ----- ---

Turner_ _________________ _

Twiggs __________________ _

40.290 $ 39.080 68.036
8.958 28.783 46.100 15.900 38.693 25.659 67.950 76.580 45.846 13.000 68.860 33.760 35.995 29.641 73.100 48.040 43.136 28.580 15.800 56.460 26.218 51.398

12,594.65 12,216.40 19,828.70
2,800.28 8,997.57 14,410.85 4,970.33 12,064.33 7,841.15 21,241.16 23,938.88 14,331.44 4,063.79 21,525.61 10,553.36 11,308.85
10' 127.58 22,851.03 15,017.29 13,452.50
8,934.10 4,939.08 17,649.38 8,195.75 16,067.01

Percentage of Total Mileage

One Cent Gas

Miles on Tax Distribut-

State System ed Yr.Ending

at 6-30-32

6-30-32

.0056440 .C054745 .0095308 .0012549 .0040321 .0064579 .0022273 .0054203 .0035944 .0095188 .0107277 .0064223 .0018211 .0096463 .0047293 .0050424 .0041523 .0102402 .0067297 .0060427 .0040036 .0022133 .0079092 .0036727 .0072001

58.559 $ 40.174 68.835 19.235 28.760 60.900 25.500 39.262 25.659 67.300 75.718 56.546 24.986 68.860 62.560 55.882 42.168 73.046 48.040 60.470 38.330 27.900 60.060 26.218 51.398

12,309.71 11,023.05 19,907.50
3,736.73 7,977.34 16,881.62 5,578.51 10,841.37 7,112.73 18,797.07 21,123.02
14 '784 .46 5,928.95 19,088.16 14,945.64 13,836.04 10,771.57 20,256.92 13,316.80 14,151.49 9,111.72 6,727.23 16,089.97 7,267.69 14,247.65

Percentage of Total Mileage
.0071441 .0049012 .0083978 .0023466 .0035087 .0074297 .0031110 .0047899 .0031303 .0082105 .0092375 .0068986 .0030482 .0084008 .0076323 .0068175 .0051444 .0089116 .0058608 .0073772 .0046762 .0034038 .0073272 .0031986 .0062705

STATE HIGHWAY BOARD OF GEORGIA DISTRIBUTION OF ONE CENT GAS TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1931 AND JUNE 30, 1932

County

One Cent Gas

Miles on Tax Distribut-

State System ed Yr.Ending

at 6-30-31

6-30-31

Percentage of Total
Mileage

One Cent Gas

Mile!! on Tax Distribut-

State System ed Yr.Ending

at 6-30-32

6-30---32

Percentage of Total
Mileage

----------------------------------- --------- --1------------------------

Union Upson __ _ Walker __ _
Walton_ Ware __ _ Warren __
"" Washington ~Wayne __ _
Webster __ Wheeler __ White __ _
Whitfield __ Wilcox __ Wilkes_ Wilkinson __ Worth_

44.160 $ 61.830 34.303 45.166 78.716 42.853 61 .300 56.138 24.110 46.179
I 24.500
46.049 44.290 51.500 43.909 55.370 1

13,804.39 19,328.05 10,727.38 14,118.88 24,813.34 13,395.59 19,162 .36 17,762.97
7,536.78 14,435.56
7,658.69
14,469.51 13,845.04 16,098.89 13,725.94 17;308.64

.0061861 .0086615 i .0048053 I .0063270 .0110269 .0060031 .0085872 .0078641 .0033774 .0064690 .0034321 .0064508 .0062043 .0072144 .0061510 .0077565

44.160 $ 61.830 48.983 52.066 78.716 42.910 92.030
75.438 I
24.110 46.339 44.900 47.109 44.290 59.347 59.044 55.370

12,241.26 17,139.42 13,165.62 13,361.77 21,820.27 11,890.02 20,109.09 17,915.76
6,683.34 12,831.98 9,942.44 12,970.55 12,277.30 15,798.26
13,013.66'1 15,348.70

.0053874 .0075432 .0059758 .0063520 .0096033 .0052349 .0112276 .0092033 .0029414 .0056533 .0054777 ,0057472 .0054034 .0072402 .0072033 .0067551

Totals __

7,138.510 [$2:223,867 .37

____ -~196.816-l$2~i-45,630-:4o [~ _.:.___

- - - - - ----------
Mileage State System increased 1932 over 1931.-1,058.306. Gas Tax disbursements decreased to Counties 1932 under

19N31o-$te78: ,23M6.i9l7e.age increases or decreases are changed quarterly. Some counties showing a difference 1932 against 1931, may have shown the difference for three quarters of the year, others may show the difference for only the final quarter.

Percentage is based on the mileage at the end of the fiscal year.

Murray County. Graded Roads by State Forces 273

STATE HIGHWAY BOARD OF GEORGIA
TABLE OF COMPLETED MILEAGE WITH FEDERAL AID, TEN SOUTHEASTERN STATES, AT JUNE 30, 1932 AND 1931.

State

Total Completed Total Completed

To

To

June 30, 1932

June 30, 1931

Increase 1932

Rank In Total Miles
1932

Rank In Added Miles
1932

- - - - - - - - - - -----~--

Alabama_____________________ _ Florida ________________________ _

GEORGIA_______

-----~----

Kentucky____ ~___ _________ _

Louisiana_________________ -~ _____ _

2,393.9 638.0
3,068.4 1,911.0
1,566.8

2,115.8 540.0
2,795.0 1,519.0 1,418.9

278.1

2

98.0

lO

273.4

1

392.0

6

147.9

9

3 9 4 1 8

!\:) MississippL ____________________ _ ~ North Carolina _______________ ~- _

1,809.0 2,226.4

1,772.7 1,970.6

36.3 255.8

7 3

South Carolina __________ ~ _____ _

2,013.6

1,863.5

150.1

4

Tennessee____ ________ ~ ________ _

1,682.4

1,461.4

221.0

8

Virginia _________________ _

1,992.9

1,624.7

368.2

5

lO
5 7 6 2

Totals ~ _____________________ _

19,302.4

17,081.6

2,220.8

---- ----------- -------------

Note: Information obtained from Magazine of Bureau of Public Roads, July 1932 and July 1931 Issues.

STATE HIGHWAY BOARD OF GEORGIA
CURRENT STATUS OF FEDERAL AID PROJECTS UNDER CONSTRUCTION IN 10 SOUTHEASTERN STATES AS OF JUNE 30, 1932

Estimated Estimated

State

Estimated

Federal

Per

Amount

Balance Initial Stage Total

Cost

Aid

Cent

Under

to

Miles Miles Miles

Comp. Construction Complete

Completed

--------------------------l-----------l-----------l~-----l-----------l-----------l--------l------1-------

Alabama__ _ __ ___

__ $ 1,812,011.04$ 884,109.47 95 $ 1, 721,410.49$ 90,600.55 74.1

74.1

Florida_____ _ __ __ ___ _____ 3, 563,837.58 1, 659,559.53 85

3 '029, 261.95 534,575.63 102.1

102.1

GEORGIA_ __ ____

__ __ 6,410,060.34 2,999,196.4S 61

3,910,136.80 2,499,923.54 160.3 166.8 327.1

Kentucky__ ___ _________ _ __ _ 2, 439,460.44 1, 079,480. 86 74

1,805,200.71 634,259.73 144.2

4.0 148.2

Louisiana ___________________ 7,471,657.46 3,511,759.18 46

3,436, 962.43 4,034,695.03 87.0

10.6 97.6

~ MississippL _______________ _ 3, 910,633. 74 1, 915,689. 81 85

3,324,038.68 586,595.06 171.2

68.8 240.0

01 North Carolina___ _________ ___ 1, 152,326. 37 567,278.11 77

887,291.30 265,035.07 67.6

5.0 72.6

South Carolina______

_ 3,131,546.27 1,409,414.06 94

2, 94il, 653.49 187,892.78 73.2

59.7 132.9

Tennessee _____ _

1,427,533.89 697,948.21 57

813,694.32 61:>,839.57 48.7

6.4 55.1

Virginia ______ _

---- 1,915,279.75 957,639.81 69

1,321,543.03 593,736.72 113.5

6.2 119.7

1----------+ ----------- - - - - - - ----~ ----- - - --~. - - - - - - - - - -

Total--10 __ _________ ___ __ $33, 234,346. ss $15, 682,075.5.2 67.8 1$23' 193' 193.20 $10,041, 153.68 1041. 9 327. 5 1369. 4

-- -

STATE HIGHWAY BOARD OF GEORGIA

FEDERAL AID PROJECTS APPROVED FOR CONSTRUCTION-10 SOUTHEASTERN STATES AS OF JUNE 30, 1932

---

- ~~-~- - - - - -

--

--

--

--

-

- - - -- -

-- -

- --

---

State

Estimated Costs Federal Aid Allotted

Initial Miles

Stage Miles

Total Miles

Balance of Federal Aid Available for New Projects
--------

Alabama __

--

--

-----

Florida ___

--------'"

-- $

GEORGIA_

Kentucky ____

-- -----

Louisiana_ ---

---

ississippi

-

-

orth Carolina __ ----

South Carolina ___

---- ---

T ennessee_
virginia _____

------ ------

-

--- -------

Totals_

--- --------------- $

655,532.89 174,461.46 1,399,E04.67 1,103,383.51 116,017.23 300,312.76 101,152.78 733,446.20 754,053.46
5,337,864.96

$

327,766.42

87,230.72

525,166.87

538,516.32

58,008.61

150,156.36

50,000.00

356,461.69

298,883.54

--

$ 2,392,190.53

17.3 6.5 17.3 29.8 16.1 7.1 5.2 17.1 22.9
139.3

$ 5,469,694.24

17.3

2,541,174.33

1.2

7.7

1,345,949.03

107.8

125.1

1,182,786.01

13.3

43.1

321,408.48

16.1

5,152,976.98

4.0

11.1

3,728,867.35

5.2

744,636.09

21.8

38.9

3,157,110.04

21.5

44.4

1,817,277.70

----- -- ------ ---------

169.6

308.9 $ 25,461,880.25

Note: Foregoing information derived from Magazine of Bureau of Public Roads, July,1932, issue. Stage miles are better menton roads that were completed of lower types originally.

STATE HIGHWAY BOARD OF GEORGIA TABLE OF AREA, POPULATION, AUTOS AND TRUCKS, SHOWING
AVERAGE MOTOR VEHICLES TO POPULATION AND SQUARE MILES FOR CALENDAR YEAR, 1931.

1930

I Population Per Autos and Trucks Pop. To Each Motor Vehicle

I ____s_t_a_te_ _ _ _ L~~d_A_re_a ___ Population__ Square_Mil~-- Regis~ered ______M__o_t_or_V_e_h_ic_l_e__ -~~~a_c_h_S_q_._M_i

Alabama _________ _ Arizona __________ _ Arkansas ________ _ California _______ _ Colorado_________ _
Connecticut_ ____ _ Delaware_________ _ Florida __________ _ M Cieorgia __________ _
::g Idaho ____________ _
Illinois.__________ _ Indiana__________ _ Iowa____________ _
Kansas _________ _ Kentucky________ _ Louisiana________ _ Maine.. -- _________ _ Maryland ______ .. __
Massachusetts ___ _ Michigan_________ _
Minnesota ______ .. _
Mississippi__ ____ _ Missouri_ ________ _ Montana_________ _ Nebraska ________ _ Nevada __________ _
New Hampshire__ _

51,279 113,810 52,525 155,652 103,658
4,820 1,965 54,861 58,725 83,354
56,043 36,045 55,586
81,774 40,181 45,409 29,895 9,941 8,039 57,840
80,858 46,362
68,727 146,131 76,808 109,821
9,031

2,646,248 435,573
1,854,482 5,677,251 1,035,791 1,606,903
238,380 1,468,211 2,908,506
445,032 7,630,654 3,238,503 2,470,939 1,880,999 2,614,589 2,101,593
797,423 1,631,526 4,249,614 4,842,325 2,563,953 2,009,821 3,629,367
537,606 1,377,963
91,058 465.293

51.6 3.8
35.3 36.5 10.0 333.4 121.3 26.8 49.5 5.3 136.2 89.8 44.5 23.0 65.1 46.3 26.7 164.1 528.6 84.2 31.7 43.4 52.8
3.7 17.9 0.8 51.5

246,465 105,572 180,731 2,043,281 308,458 336,040 55,502 323,260 320,840 111,663 1,612,770 862,672 748,438 559,176 327,326 263,050 188,238 325,372 840,190 1,230,980 720,401 183,650 752,805 127,166 416,131 32,168 111,510

10.74 4.13 10.26 2.78 3.36 4.78 4.29 4.54 9.06 3.98 4.73 3.75 3.30 3.36 7.99 7.99 4.23
5.01
5.06 3.93 3.56 10.94 4.82 4.23 3.31 2.83 4.17

4.81 .93
3.44 13.13 2.98 69.72 28.24 5.89 5.46
1.33 28.78 23.94 13.46 6.84 8.14 5.81 6.29 32.73 104.51 21.28
8.91 3.93 10.95
.87 5.42
.29 12.35

STATE HIGHWAY BOARD OF GEORGIA TABLE OF AREA, POPULATION, AUTOS AND TRUCKS, SHOWING
AVERAGE MOTOR VEHICLES TO POPULATION AND SQUARE MILES, FOR CALENDAR YEAR, 1931.

1930

Population Per Autos and Trucks Pop. to Each Motor Vehicle

State

Land Area

Population

Square Miles

Registered

Motor Vehicle To Each Sq. Mi.

- - - - - - - 1 - - - - - - ----------------------1----- -- - - - - - - - - - - - - - - - - - -

New Jersey_ _ _

New Mexico __ New York_____ _

North Carolina __

North Dakota_ Ohio________ ___ _

Oklahoma_______ _

Oregon__________ _

""Pennsylvania __ _ O:l Rhode Island__ _

South Carolina __

South Dakota Tennessee_ _____ _

Texas____

_

Utah________ _

Vermont __

Virginia

W a s h i n g t o n __

West Virginia

W i s c o n s i n __

Wyoming

7,514
122,503 47,654 48,740
70,183 40,740 69,414 95,607
44,832 1,067 20,495 76,fl68
41,687 262,298 82,184
9,124
40,262
66,836 24,022 55,256
97,548

4,041,334 423,317
12,588,066
3, 170,276 680,845
6,646,697 2,396,040
953,786 9,631,350
687,497 1,738,765
692,849
2,616,556 5,824, 715
507,847
359,611 2,421,851
1,563,396 1,729,205
2,939,006 225,565

537.8
3.5 264.2 65.0
9.7 163.1
34.5 10.0 214.8 644.3
57.0 9.0 62.8 22.2
6.2 39.4 60.2
23.4 72.0
53.2 2.3

869,867
81,325 2,297,249
428,737 171,293
1,710,625 482,725
278,225 1,741,942
137,878
203,719 193,025 350,520 1,297,301
108,958 f\3,877
379,227
420,878 253,308
754,249 62,101

4.65 5.21 5.48
7.39 3.97 3.89 4.96
3.43 5.53
4.99 8.53 3.59
7.46 4.49
4.66 4.29 6.33
3.71 6.83
3.89 3.63

115.76 .66
48.21 8.fl0 2.44
41.99 6.95 2.91 38.85
129.22
6.68 2.51 8.41 4.94
1.33 9.19 9.42
6.29 10.54
13.65 .64

--1----------------------1--------1-------

Totals __ _

_2_,_()'@_,'714 _ _ _ 12~,288_,_!7:7_ ---------_:c=-

25,640,584 --

4.77

11.67

District Columbia_ Grand Totals

62 2,973,776

486,869
------
1 122,775,046

7,852.7

173,519 25,814,103

2.fl0

2,798.69
---- ----------

MOTOR FUEL CONSUMPTION--NET RECEIPTS FROM SAME, AND TAX RATE BY STATES IN U.S. FOR CALENDAR YEAR, 1931.

State

Net Gals. Taxed For Motor
Vehicles

Net Receipts

I Tax Rate --~------
End Now '31 '32

State

Con-
I sump-
Rtiaonnk I

State

Rank in Re-
ceipts

------ ---- -- - - - --

------

--- --

AArlatzboanmaa_____________-_-_-_-_-_-

162,670,816$ 64,701,865

7,197,474 5 --- New York _____ -3,204,320 5 -- --- California ___

1 2

Calif :1 Ohio

ornia _____

____ ---

-----
-----

-
-

1 2

Arkansas _______ --California _______ Colorado__ --- ----

110,579,175 1,328,787,915
156,358,455

6,448,049 6 39,863,637 3
6,254,338 4

--- Pennsylvania_ --- -

--- Ohio ___ ---

--

Illinois ----- ------

3 (ennsylvania _____

4 5

New York___ _____ Texas ______________

3 4
5

Connecticut

236,399,661

4,776,752 2

-- Texas __ ---

6 !1 Illinois __

-------

6

Delaware_ - ---

35,735,365

1,072,061 3

Michigan ___

7 Michigan_ --------

7

Florida ___ --------

235,057,035

15,018,220 7

New Jersey__

8 Indiana ______ ------

8

GEORGIA

221,891, 668

13,313,500 6

Massachusetts

9 New Jersey ________

9

Idaho _____

-

Illinois __ --- -

Indiana ___ -------

Iowa _____

----

--

Kansas _______

Kentucky______ ----

Louisiana ______ ----

Maine _______

-

Maryland __ --------

M a s s a c h u s e t t s ______

Michigan ___ - ----Minnesota __________

Mississippi _________

MissourL ___________

Montana ____________

Nebraska ___________

Nevada ___________ -
New Hampshire_____

51,967,321 968,856,165 450,863,830 364,252,984 269,029,495 176,202,606 187,955,663 109,568,209 185,775,062 558,555,950 727,744,907 369,005,304 115,640,338 460,328,204 60,363,076
227,406,2071 19,447,944 66,428,585

2,609,427 5 --

Missouri -- -

- 10 Wisconsin _________ 10

29,065,685 3

Indiana ______

11 Massachusetts_ ---- 11

18,043,525 4

Wisconsin_

12 jFlorida_______ ----

12

10,927,589 3

Minnesota __

- 13 North Carolina_____ 13

8,070,885 3

Iowa ____

-----

-

14 GEORGIA____ ------

14

8,812,994 5

Kansas _____

15 Oklahoma ____ ---- 15

9,397,783 5

Oklahoma_

16 Tennessee _____ ---- 16

4,439,375 4 -- --- North Carolina

17 Virginia______ -----

17

7,431,002 4

. --- Washington_

18

Minnesota_ --------

18

15,306,376 3 -- --- Connecticut_ ----

21,872,640 3

-- Florida__

---

19 20

Washington ________ Iowa__________ ----

19 20

11,070,159 3

---- Virginia __ -

-- 21 Louisiana_ ------

21

6,009,436 5~ -- !Nebraska_ _

- 22 MissourL ___ ----- 22

9,206,564 2 ----- GEORGIA__ ------ 23 Nebraska___________

23

3,018,154 5 .. --- ]Tennessee_ _ ----- 24 Kentucky __________

24

9,096,248 4

--- Louisiana __ ---- 25 Kansas ___

------

25

777,918

4

---

I Maryland ___

- 26 .Maryland__ ------

26

2, 657,143 4 ----- IKentucky ___

-- 27 !South Carolina_____ 27

MOTOR FUEL CONSUMPTION-NET RECEIPTS FROM SAME, AND TAX RATE BY STATES IN U.S. FOR CALENDAR YEAR, 1931.

Totals_

15,321,335, 652 $ 535,863,421 _

____ ___ ___ ____ ______ _

District of Columbia!

86,:314,8001

1.726,2961 2r 1------li

Notes: I:'istrict of Columbia not included in total. Information furnished "AmE>rican Highways" by Bureau of Public Roads and was compiled from Reports of State

Officials.

COLLECTION COST AND DISTRIBUTION OF GAS TAX EXPENDITURES, BY STATES IN U. S. CALENDAR YEAR, 1931.

State

Collection

Constr. & Maint.

Road Bond

Miscel.

Total

Tax Rate

Cost

State Hwy.

Local Rds.

Payments

Purposes

End'3 1

----

--

-------- -

Alabama____________ $ Arizona _____________ Arkansas ___________

16,644 $ (16, 556) 20,000

2,204,117$ 2,227,256
200,000

3 ,248, 655$

1,728,058 -- --------- - $

977,064-

--- - - - -

------

-

-----------

787,846

5,282,399$

157,804

7,197,474 5 3,204,320 5 6,448,049 6

C a l i f o r n i a ___________

124,632

Colorado____________

67,379

Connecticut ________

(30,000)

Delaware ___________ Florida _____________

--------

-------
32,050

GEORGIA __________

4,200

Idaho_______________

30,355

Illinois ______________

106,834

Indiana ____________

66,942

Iowa ________________

62,956

Kansas _____________

(15,000)

Kentucky ___________

30,987

L o u i s i a n a ___________ ~aine ______________

62,000 32,772

~aryland ___________

20,549

~assachusetts ______

(22, 500)

~ichigan ____________

54,639

26,467,700 4,330,871

13,233,850 ----- --------1,670,479 ------- --------

37,455 185,609

4,776,752 -- ------------- ------- --- ----- --------------

533,881 ----------------

538,180I --- -- --

5,781,048

423,555

5,781,047

3,000,520

8,872,867

2,218,217 -- ----

---

2,218,216

2,325,833 --- ----

---

242,594

10,645

19,305,901 13,482,437

9,652,950 ---

------

--

---

3,370,609 - ------

1,123,537

6,372,372

4,492,261-

-

----

- ---

- ---

6,270,885

1,800,000 ---- ------

--

--- ---

8,782,007- - --4,791,951 -----

- - - - - - - - -
---

-- - ----
2,664,276

-----
1,879,556

2,203,302

2,203,301-

------

-----

5,868,362- --------

---- ------

- ----

1,542,091

12,535,626 14,707,047

902,267 --- ----

4,070,661

3,000,000

1,868,483 40,293

39,863,637 3 6,254,338 4 4,776,752 2 1,072,061 3 15,018,220 7 13,313,500 6 2,609,427 5
29,065,685 3 18,043,525 4 10,927,589 3 8,070,885 3 8,812,994 5 9,397,783 5 4,439,375 4 7,431,002 4 15,306,376 3 21,872,640 3

~innesota __________

(13,000)

7' 380,106

3,690,053 -----

----

11,070' 159 3

~ississippi --------
~issourL __________ ~ontana ____________

11,281 49,189
27' 147

2,901,625

2,871,310 -----

9,157,375 - ----

---

2,970,346 -- -------

---
- -- --
20,661 ---

225,220
------

6,009,436 5 9,206,564 2 3,018,154 5

Nebraska __________

11,250

Nevada ______ - ------ ------

--- --

New Hampshire ____ --- -- -------

New Jersey _________
New ~exico _______ _I

18,600 60,110

6,813,749

2,271,249-

. ---

777,918 ------

--

1' 992,857- ---- --

664,286.-

11' 636,747 ----- --

427,5001

1,686,034 --

-- --

928,933

-----
---
----
5,090,000 10,500

9,096,248 4 777,918 4
2,657,143 4 17,172,847 3 2,685,577 5

COLLECTION COST AND DISTRIBUTION OF GAS TAX EXPENDITURES,

BY STATES IN U.S. CALENDAR YEAR, 1931.

Tax

State

Collection Cost

Constr. & Maint.

State Hwy.

Local Rds.

Road Bond Payments

Miscel. Purposes

Total

R:1te End '31

~$ --2~~-~:-: $-- 35::~:::::: $--100,~~~~2 $-42~:~~~~~1~8~~ $53~ ------------ ---~~--~1--

New York ___________ $
North Carolina ____ _ North Dakota______ _

50,000 $ 9,370
33,237

22' 904,367$ 4,379,478
1 '332' 351

6,107,831 ---------------- $

2' 639,474$

6,400,509

666' 175 ------------- --

1' 526,958$ 595,472
692

Ohio___ _ Oklahoma _____ ~--Oregon _____________ _
P e n n s y l v a n i a __ Rt ode Island __ f:outh Carolina__ South Dakota _____ _ &5 __ _ Tennessee~ ""Texas __ _ Utah____ _
Vermont_ Vlrginia ~ _________ _
Washington__ _
West Virginia_ Wisconsin_____ _

107,956 71,552 18,300 765,125 (15,737)
48,602 57,305
4,214 (2,000) (14,0961 (10,0001 14' 777 20,469

22 '061, 305

9 '805' 024 --- ------------

7' 353' 768

7,249,008

2,416,302 --- ------------

1,928,570

6,168,618---- ---~ ------ --- ----~------- ---- ------ --

23,423,209

5,563,743

3,436,513 -~- ------

1,422,206 --- -- --------

4,796,512

1,207,665

474,069 ------ ---1,241,812- ~--- - ---

3,346,073-------------- - ----- -------- --

--- --

4,209,658

2,994,786

4,199,274

-- ~--

22,885,918 ------------- -------- --

7' 628,640

2,305,464---------------- ------

- - -- ~ ------

1,562,638 -- ----- ------

278,906

125,000

8,011,651

3,433,564 ---- ---

--- -- ---~

8,587,166

2,445,296---- --

-------

2 '054' 573 ---------------

3, 325,872

-- -

8,830,273

4,514,493

1,797,646]

617,300

\';yoming _____ _

Totals _____ _

30,589, 156

2

14,024, 303

6

2 '032' 455 39' 328' 053 11,665, 432

3 4 5

6,186, 918

4

33,188, 590

3

1,896, 275

2

7,245, 989

6

3,394, 675 11,461, 023

4 7

30,514, 558

2,309, 1,966,

678 544

4 4 4

11,445, 215

5

11,032, 462

5

5' 395, 15,780,

222 181

4 4

014

4

-

---

421

District of Columbia __ ~c:-c:_--=-=-~c:_::_::.::_:cc:::_:.:c:c::__::-c_:_::_-::_:~-:_::-:_::-c:-~-=-=-=-=---=---::_:-::_:-:_::-=-=-~'-~~-___________ ___ ~

1 $~_1::_:::_:72::_:6:_::::_:29_.6:_::i$~_ _:_::1~::_:72::_:6:_::'::_:29::_:6~1-~2-

Notes: Construction and Maintenance 84 .74';;, Collection, Bonds, Miscel.- 15 .26';
District of Columbia not includ.ed in totals. Figures in parenthesis denote collection costs from other sources than Gas Tax and are not added in totals. Miscellaneous purposes, include Expenditures for Schools, for other State Departments, for General Funds and other ~tate items, the largest being Oklahoma for special relief and seeds. Information furnished by Bureau of Public Roads from reports of State Officials.

TOTAL NUMBER OF MOTOR VEHICLES, LICENSE FEES AND GAS TAX PER VEHICLE BY STATES IN U.S -CALENDAR YEAR 1931.

Number Gro. Receipts Average

State

of

from Motor MV Fees

Autos Vhcle License

Per

and

Fees, Etc.

Vehicle

Trucks

- - - - - - -----~~-----

---

Alabama ____ ------ 246,465 $

Arizona ____

-- 105,572

3,379,392 $ 767,508

13.71 7.27

Arkansas_

-----

180,731

3,495,545

19.34

California ---- ---- 2,043,281 Colorado_________ __ 308,458

9,763,274 1,910, 741

4.78 6.19

Connecticut. ______ 336,040

8,259,542

24.58

Delaware_________

55,202

1,043,173

18.90

Florida _________

323,260

4,851,968

15.01

GEORGIA ____ Idaho_______ - -Illinois ______ --

320,840 111,663 1,612,770

4,256,553 1, 909,363 18,426,497

13.27 17.10 11.43

Indiana___

862,672

6,332,101

7.34

Iowa ______ ---

748,438

12,539,613

16.75

Kansas __ -- ----Kentucky ---- -Louisiana____ - --Maine _______ --Maryland _____ -

559,176 327,326 263,050 188,238 325,372

6,059,910 4,842,108
4,549,244 3,184,091 3,497,807

10.84 14.79 17.29 16.91 10.75

Massachusetts

840,190

7,000,306

8.34

Michigan_

-

1,230,980

21,821,290

17.73

Minnesota_ ---

720,401

10,784,845

14.97

Mississippi. __ . ----

183,650

2,421,287

13.18

Missouri._ --- - -Montana ____ ------

752,805 127,166

10,140,429 1,499,492

13.47 11.79

Nebrasl<a _______

416,131

3,742,401

8.99

Nevada _____

32,168

388,327

12.07

New Hampshire__

111,510

2,257,459

20.24

New Jersey ________ 869,867

15,891,2()4

18.27

Net Revenue From
Gas Tax

Average
Gas Tax Revenue
Per
Vehicle

Combined Receipts FromM. V. Fees and Gas Tax

Average Total
Receipts,
Fees and
Gas Per Vehicle

$ 7,197,474
3,204,320 6,448,049 39,863,637
6,254,338 4,776,752 1,072,061
15,018,220 13,313,500 2,609,427 29,065,685
18,043,525 10,927,589 8,070,885 8,812,994
9,397,783 4,439,375
7, 431,002 15,306,376
21,872,640 11,070,159 6,009,436 9,206,564
3,018,154 9,096,248
777,918
2,657,143 17,172,847

--~--

----~--~--

$ 29.20 $ 10,576,866 $

30.35

3, 971,828

35.68

9,943,594

19.51

49,626,911

20.28

8,165,079

14.21

13,036,294

19.42

2,115,234

46.46

19,870,188

41.49

17,570,053

23.37

4,518,790

18.02

47,492,182

20.92

24,375,626

14.60

23,467,202

14.43

14,130,795

26.92

13,655,102

35.73

13,947,027

23.58

7,623,466

22.84

10,928,809

18.22

22,306,682

17.77

43,693,930

15.37

21,855,004

32.72

8,430,723

12.23

19,346,993

23.73

4,517,646

21.86

12,838,649

24.18

1,166,245

23.83

4,914,602

19.74

33,064,051

42.91
37.62 55.02
24.29 26.47 38.79
38.32 61.47 54.76 40.47 29.45 28.26
31.35 25.27 41.71
53.02 40.49
33.59 26.56
35.50 30.34 45.90
25.70 35.52 30.85
36.25 44.07
38.01

Rank in
Total Rcpts.
29 42 31 4 34 26 47 15 19 38
5 10 11 22 24 23 35 28 12
7 13 33 16 39 27 48 37 8

TOTAL NUMBER OF MOTOR VEHICLES, LICENSE FEES AND GAS TAX PER VEHICLE BY STATES IN U. S.-CALENDAR YEAR 1931.

Average

State

Number of
Autos and Trucks

Gro. Receipts Average

from Motor MV Fees

Vhcle License

Per

Fees, Etc.

Vehicle

Net Revenue From
Gas Tax

Average Gas Tax
Revenue Per
Vehicle

Combined
Receipts FromM. V.
Fees and Gas Tax

Total Receipts,
Fees and Gas Per Vehicle

Rank in
Total
Rcpts.

------------1-----1-------1-------------1-------------------- ---1----

New Mexico________ _ 81,325 $ 1,248,097 $ 15.35 $ 2, 685,577 $ 33.02 $ 3, 933,674 $ 48.37

43

New York_________ _ 2,297,249

41,877,611

18.23 30,589,156

13.32

72,466,767

31.55

1

Nortb Carolina ____ _ 428,737

6,164,549

14.38 14,024,303

32.71

20,188,852

47.09

14

North Dakota _____ _ 171,293

1,799,120

10.50

2,032,455

11.87

3,831,575

22.37

44

Ohio_____________ _ 1, 710,625

12,818,705

7.49 39,328,053

22.99

52,146,758

30.48

3

Oklahoma_________ _ 482,725

5,857,107

12.13 11,665,432

24.17

17,522,539

36.30

20

Oregon __________ _ 278,225

6,940,504

24.95

6,186,918

22.24

13,127,422

47.19

25

Pennsylvania _____ _ 1,741,942

31,607,172

18.14 33,188,590

19.05

64,795,762

37.19

2

"" Rhode Island __

137,878

2,272,879

16.48

1,896,275

13.75

4,169,154

30.23

41

~South Carolina __

203,719

2,790,008

13.69

7,245,989

35.57

10,035,997

49.26

30

South Dakota __

193,025

2,808,172

14.55

3,394,675

17.59

6,202,847

32.14

36

Tennessee ________ _ 350,520

4,580,685

13.07 11,461,023

32.70

16,041,708

45.77

26

Texas________ ___ _ 1,297,301

13,994,647

10.79 30,514,558

23.52

44,509,205

34.31

6

Utah ______ _

108,958

828,303

7.60

2 ,309, 678

21.20

3,137, 981

28.80

45

Vermont_ ___

83,877

2,355,913

28 .08

1, 966, 544

23 .45

4, 322,457

51.53

40

Virginia_______ _

379,227

6,159,257

16.24 11,445,215

30.18

17,604,472

46.42

18

Wasllington_____ _ 420,878

7,623,570

18.11 11,032,462

26.21

18,656,032

44.32

17

West Virginia ___ _ 253,308

4,519,763

17.84

5,395,222

21.30

9,914,985

39.14

32

W i s c o n s i n __

754,249

11,724,995

15.55 15,780,181

20.92

27,505,176

36.47

9

Wyoming__ _

62,101

727,667

11.72

1,587,014

25.56

2,314,681

37.28

46

$ - Totals __ _

- - 25,640,584

$ 343,714,194

-
$

-l3 .40-

i$5s5, 868~21-

i$ -2o.-89

-

$879~ 577~

34 .so--

D1stnct of Columbw] 1713,519 !$

623,460 ]$

3.59 ]$ 1,726,296 I$

9.95 ]$ 2,349, 756 i$ 13.54 1

Note: District of Columbia not included in totals. Above information obtained from "American Highways" and was furnished by Bureau of Public Roads from reports of State Officials.

STATE HIGHWAY BOARD OF GEORGIA INDEX TO FOURTEENTH REPORT.

INDEX

Page

A

No.

Accidents Reported-Comment and Tables .. ______ ________ ___ 241

ACCOUNTING-ALPHABETICAL INDEX AS FOLLOWS;

Analysis of Administration Expense Disbursements by Object of

Expenditure___________ ___

________________ Schedule 8-A 56

Analysis of Conf'truction Expense Disbursements b~' Object of

Expenditure ___ --__

_____________________ Schedule 8-B 57

Analysis of Equipment Expense Disbursements by Object of Expenditure ______________________________________ Schedule8-D 59

Analysis of Legislative Transfers Expense Disbursements ____________________________________________ Schedule 8-E 59

Analysis of Maintenance Expense Disbursements by Object of Ex-

penditure

_________

_________________ Schedule 8-C 58

Analysis of Administration Expense Disburc;ement" by Division Units ___________________________________________ Schedule 10-A 63

Analysis of Actual Construction Expen"e Disbursements by CongressionalDistricts and Division Units ___________ Schedule lO-B 65

Analysis of Expense Disbursements by Detail Object of Expenditure Classification ________________________________ Schedule 11 76

Analysi'l of General Maintenance Expense Disbursements by Con-

gressional Districts and Division Units __________ Schedule 10-D 7l

Analysis of Reconstruction Expense Disbursements by Con-

gressional Districts and Division Units _ __ _Schedule 10-E 74

Analysis of Survey Expense Disbursements by Con-

gressional Districts and Division Units ___________ Schedule 10-C 68

Chart of Revenue and Expenditure Percentages_______

36

Comment_ ____________________________________________

27

Construction Allotments and Disbursements by Types Schedule 12 88

Detail of Administration-Unencumbered Allotments by Division

Units and Congressional Districts_____

___ Schedule 6-C 51

Detail of Construction-Unencumbered Allotments by Class of

Project_________________________

Schedule 6-A 44

Detail of Equipment-Unencumbered Allotments _ __Schedule 6-D 53

Detail of Maintenance-Unencumbered Allotments by Division

Units and Congressional Districts

Schedule 6-B 46

Land, Buildings and Equipment__

_____ Schedule 4 40

Reconciliation of Fund Deficit___

____ Exhibit B 32

Statement of Assets and Liabilities Fund Balances ______ Exhibit A 30

Statement of Revenue Receipts and Fund Disbursements_ Exhibit C 34

Summary of Actual Allotments of Congressional Districts and Com-

parison with Allotments on Mileage Basis

__ Schedule 14 91

285

INDEX-Continued

Summary of Allotments, Appropriations and Fund Balances Reflecting Reconciliation with Expense Disbursements__ Schedule 6 42
Summary of Con"truction _______________________________ Exhibit D 37
Summary of Construction Allotments by Congressional DistrictsBeginning of Dept. to June 30, 1932 ________________ Schedule 13 89
Summary of Estimated Participation-Reflecting Reconciliation with Revenue Receipts_ .. ____________________________ Schedule 7 54
Summary of Expense Disbursements by Congressional Districts _____________________________________________ Schedule 9 61
Summary of Expense Disbursements by Division Units Schedule 10 62 Summary of Expense Disbursements by Object of Expen. _Schedule 8 55 Treasurer's Account-Bank Balances____________________ Schedule 1 39

Apportionment of Federal Aid to Georgia__________

_ 196

Asphalt Department-Comment and Tables_______

185

Automobiles--State Highway Department Table ___

229

Automobiles and Trucks Registered in United States-Each State__ 277

B

Biography of Highway Board Members_

_ _ _ _ _ _ _ _ _ _ _ _

6

Beautification-Roadside ______________________________________ 239

124

Board Members and Personnel of Officials ___ _

ll

Bridge Construction-Bridge Comment_____ _____________________ 167

Bridge Construction--Bridges Completed__________________________ 172

Bridge Construction-BridgA Paint_____________________

170

Bridge Construction-R. R. Crossings __ _

180

c

Chart of Highway Dollar ____________

.. ________ 36

Chart of Organization__________________ _______________________ 10

Comment-Accounting__ __________ ____ ___________________

27

Comment-Asphalt Department ____________________________________ 185

Comment-Bridge Department _____________________________________ 167

Comment-Convict Department_ _________ ._________________________ 187

Comment-Laboratory ___ _

___________________________________ 191

Comment-Maintenance____________________________________________ 199

Comment--Road Construction _____________________________________ 101

Comment-Surveys and Plans

124

Comment--Roadside Beautification ________________________________ 239

Comment-Maps __________ _

244

Comment-Magazine _______________________________________________ 249

Comment-Signs __________________________________________________ 234

Comment-Warehouse_________________ ____________________________ 248

Completed Mileage with Federal Aid-10 S. E. States _______________ 274

Construction-Asphalt Department ______________________________ . _ 185

Construction--Blue Prints ________________________________________ 124

286

INDEX-Continued

Construction-Bridge ________________________________ _

172

Construction-Convict ________________________________ _

187

Construction--Laboratory Comment and Renort ______________ _ 191

Construction-- Plans _________________________ _________

124

Construction-Roads Completed___________ ___________ ________ 126

Construction-Road:o Placed Under Construction_ _______ __ _

141

Construction- Surveys_______ _

124

Contents _____ ------------------------------- _________________ _ 3

D

Distribution of Gas Tax Expenditures, each State in U. s.__ _

281

Distribution of Gas Tax Fund, 1 gallon to Georgia Counties_______ 266

E
East Point Shop- -Comment and Report______________________ ___ _ 231 Equipment- -ComrnenL _______ __ ____ __ __ ___ __ ______ __________ 224 Equipment-Tables of Autos and Road Machinery _____________ 225

F

Federal Aid--Apportioned to G<'lorgia. ___________________________ _ 196

Federal Aid-Approved for Construction-10 S. E. States ________ _ 276

Federal Aid-Projects Completed-10 S. E. States _________________ _ 274

Federal Aid-Projects under Construction---10 S. E. States _______ _ 275 Foreword_______________ _ __________________________________ _

Freight Accountant ___ ____________________________________________ _ 98

Frontispiece_________________________________________ _

2

G

Gasoline-Taxed in U. S. bY States_

279

Gasoline--Tax Expenditures in U. S. by States_

281

H

Heavy Road Machinery ________ _

228

Highway Beautification ___________ _

239

Highway Magazine _______________ _

249

Highway Maps_ ___ _

________ _

244

History of Highway Board Members.

6

Inventories _____ _

I - ------- --- ---224

287

INDEX-Continued

L Laboratory Comment and Report_ _________________________________ 191

Land and Buildings ____ -------------------------------- _________ 40

Letter of Transmittal, Board to Governor______________ _________ 13

Letter of Transmittal, Highway Engineer to Board__________________ 15

Letter of Transmittal, Treasurer_______________________

15

List of Georgia Counties, showing Engineering Divisions, Congressional Districts, Population, Mileage___________________________ 17

M Magazine___ ________________________________________________________ 249

Maintenance--Comment________ _

199

Maintenance-Sections, Personnel and Mileage _____________________ 200

Maps______________________________________________________

244

Mileage by Cong1essional Districts________________________

_ 111

Mileage by Engineering Divisions __________________________________ 105

Mileage by Congressional Districts-State Route Numbers_______ ___ 120 Mileage by Engineering Division- State Route Numbers ____________ 117 Motor Vehicles, License Fees, Gas Tax, each State ___________________ 283 Motor Vehicles, Registered and License Fees, Each State ____________ 277

0 Officials and Personnel of Board________________________________ __ 11 Organization Chart____________________________________________ __ __ 10
p Paint-Bridge _______________________________________________ .. ______ 170 Paint-Sign ________________________________________________________ 237

Plans_ ____ ____ ______ __ __ __ __ __ ______ __ __ __ ____ ___ __

__ 124

Projects Completed and Closed-Engineering Units _________ ._ 126
Projects Placed under Construction-Engineeirng Units ___________ 141 Purchases _________________________________________________________ 194

R R. R. Claims_____________________________________________________ __ 98
R. R. Crossings, Eliminated _______________________________________ ._ 180

Recapitulation-Miles and Types of Road Completed-Cong. Dists. 139 Recapitulation-Miles and Types of Road Completed-Eng. Units_._ 138 Recapitulation-Miles and Types of Road under Construction-
Congressional Districts ______________________________________ . 165

Recapitulation-Miles and Types of Road under ConstructionEngineering Units____________________________________________ _ 162
Road Information _______________________ . ___ ___________ _________ __ 243

T

Table Showing Comparison of Road Construction. 1931 and 1S32 ____ 182

Title Page________________________________ ____ __ ___ _________ __

1

Tractors ____.______________________

_______ _____________ __ 227

Traffic Accidents _________________________________________________ 241

Traffic Count _________________________________________ . _________ . _ 250

Trucks and Autos Registered in U. S., Each State________________ 277 Trucks-State Highway Department_____________________________ 226
w
Warehouse Comment __________________________ . _________ .. __________ _ 248 288