Enhancing the accuracy of construction cost estimates for major lump sum (LS) pay items and generating a more-accurate list of pay items throughout the design development process
MLA
Ashuri, Baabak. "Enhancing the accuracy of construction cost estimates for major lump sum (LS) pay items and generating a more-accurate list of pay items throughout the design development process." University of Georgia. Map and Government Information Library. 2022-06, https://dlg.galileo.usg.edu/do:dlg_ggpd_s-ga-bt700-pr4-bm1-b2022-bc67-belec-p-btext.
APA
Ashuri, Baabak (2022-06). Enhancing the accuracy of construction cost estimates for major lump sum (LS) pay items and generating a more-accurate list of pay items throughout the design development process. Retrieved from https://dlg.galileo.usg.edu/do:dlg_ggpd_s-ga-bt700-pr4-bm1-b2022-bc67-belec-p-btext
Chicago
Ashuri, Baabak. "Enhancing the accuracy of construction cost estimates for major lump sum (LS) pay items and generating a more-accurate list of pay items throughout the design development process." 2022-06. July 15, 2025. https://dlg.galileo.usg.edu/do:dlg_ggpd_s-ga-bt700-pr4-bm1-b2022-bc67-belec-p-btext.