State Transportation Improvement Program, FY 2015-2018 [2015]

Please send any comments to: Ryan Walker
STIP Project Manager Email STIPCoordinator@dot.ga.gov Georgia Department of Transportation
Office of Planning 600 W Peachtree Atlanta, Georgia 30308 Phone (404) 631-1987
2

3

FY 2015-2018 State Transportation Improvement Program

Section I. II. III. IV. V.

Page(s) 5 9 11 12 13

VI.

16

VII.

32

VIII.

38

IX.

39

X.

40

XI.

41

Appendix A Appendix B

391
396 397 398 399 400 402 403 404 405 406

Content
Introduction and Overview
Public Involvement Process
Georgia's Transportation Leadership
Governor's Strategic Goals for Georgia
Metropolitan Planning Organizations (MPO) Map Georgia MPO Contact List
Financial Plan STIP Amendment Process
Lump Sum Funding MPO Lump Sum Process
STIP Funds by Category Pie Chart
Understanding STIP Entries
Map of Georgia
Index of Counties STIP Projects by County, Individually numbered
Glossary of terms
Maps Georgia's Rail System Map Existing Urban and Rural Transit Programs Map State Bicycle System Map Governor's Road Improvement Program (GRIP) Fact Sheet and Map Georgia's Statewide Designated Freight Corridor Map State Freight Network STIP Map Georgia Department of Transportation District Map Georgia Congressional Districts Map

4

Section I.
Statewide Transportation Improvement Program
Introduction
We are pleased to present the Statewide Transportation Improvement Program (STIP) for Fiscal Years 2015 through 2018. The STIP lists Federally-funded transportation projects that are located outside Metropolitan Planning Organization (MPO) boundaries.
Each MPO develops its own Transportation Improvement Program (TIP) and questions about projects in those areas of the state may be directed to the individual MPO shown in the MPO Contacts section of this STIP. The TIPs are included in the STIP by reference without modification once approved by the MPO and the Governor or his designee.
Purpose
In order to receive Federal transportation project funds, the Georgia Department of Transportation (GDOT) develops the STIP. The STIP lists all highway, public transit, and multimodal projects proposed for funding under Title 23 (highways) and Title 49 (transit) of the U.S. Code. The STIP includes Highway, Bridge, Bicycle, Pedestrian, Safety, Transportation Alternative Program Activities and Public Transportation (transit) projects.
Project-related costs, such as preliminary engineering (PE), right-of-way acquisition (ROW), construction (CST) and utilities (UTL) are shown for highway projects; capital and operating costs are shown for transit projects. The projects are organized in alphabetical order by county with information on cost, description and fiscal year. Projects that extend into multiple counties are shown in the STIP under each county the project enters. Please see "Understanding STIP Entries" in Section IX for detailed information on how to read STIP entries.
Development
The STIP is developed under the framework of the 2010-2030 Statewide Strategic Transportation Plan (SSTP) in an effort to coincide with the Governor's Strategic Goals for Georgia and to achieve the outlined goals of:
Supporting Georgia's economic growth and competitiveness; Ensuring safety and security; Maximizing the value of Georgia's assets; and Minimizing impact on the environment.
5

This year's STIP makes great strides in the effective movement of freight around the state. Widening corridors designated on the Statewide Freight Corridor Network see Appendix B and key connections to the interstate will improve the flow of freight throughout the state. There are also numerous congestion relief projects including several state route widenings and bypasses. The 2010-2030 SSTP is available online at: www.dot.ga.gov/SSTP-SWTP.
Projects listed in this document were identified through GDOT's ongoing planning processes and are vital to the state's transportation program. Projects in the STIP emphasize the maintenance, safety, and improvement of existing transportation facilities and public transportation systems. The projects support GDOT's mission to provide a safe, seamless and sustainable transportation system that supports Georgia's economy and is sensitive to its citizens and environment.
This STIP serves as a document to provide all citizens and interested stakeholders with the opportunity to review and comment on the state's transportation priorities for the next four fiscal years. Additionally in the non-MPO areas which the STIP covers, projects are identified in direct cooperation with rural (non-MPO) local governments through formal, annual face-to-face meetings with GDOT as well as regular/ongoing informal contact with GDOT throughout the rest of the year. It is also developed with input from stakeholders and the general public.
The STIP was developed under all relevant guidelines provided by the Transportation Equity Act for the 21st Century (TEA-21), passed by Congress in 1998 and has continued with the Moving Ahead for Progress in the 21st Century Act (MAP-21) passed by Congress in 2012. The STIP is submitted to the Federal Highway Administration and Federal Transit Administration for final approval.
Public Involvement
Through direct contact with local elected officials, as well as stakeholders and the general public, the STIP is presented for consideration and comments throughout its development. In addition to the face-to-face meetings with local elected officials, the STIP is presented at public meetings held around the state by GDOT staff that encourages questions and input. These meetings are held at various locations and are advertised through mailings and press releases. Comments and questions can also be submitted by mail, e-mail and telephone/fax directly to GDOT staff at any time throughout the year. The STIP is also available on the internet at:
www.dot.ga.gov/stip
6

Funding
The STIP is fiscally balanced and includes only those projects with funding available or having a reasonable expectation to obtain funds. Federal funds for fiscal years 2015, 2016, 2017 and 2018 are program estimates and will not be final until after the Federal budget is implemented on October 1st of each year.
Cost estimates for individual projects are based on the best available engineering estimates. These costs may change as a project progresses from preliminary engineering to the purchase of right of way to construction. If a cost estimate results from a change in the original scope of the project, the STIP will be amended including the necessary public involvement. If an increased cost estimate is based on updated engineering estimates rather than a change in the actual work, no amendment to the STIP is necessary. Greater detail may be found in the Financial Plan in Section VI.
The most current Census data (2010) indicates that Georgia's population growth rate from 2000 to 2010 was 18.3%, which is more than double the U. S. average population growth of 9.7% over the same time period. Georgia's economy is also growing, leading to increased demands on the transportation system. The STIP process ensures that maximum benefits are received from available funding and that Georgia's transportation system will continue to support and promote Georgia's growth and economy.
Based on the National Cooperative Highway Research Program (NCHRP Project 20-24 (37)), Georgia invests less per capita in transportation than most other states. Despite this fact, Georgia ranks 1st for construction projects on budget at 85% and ranks 2nd for construction projects delivered on time at 85%. Georgia's ranking is based on a 39-state study.
Project List
The continued emergence of the Port at the Savannah complex as one of the leading container ports in the United States has provided Georgia a great strategic transportation asset, giving the State a larger role in global trade. Savannah's growth has introduced a range of economic development opportunities, particularly for distribution, warehousing, and manufacturing. Freight volumes, mostly in the form of containers handled by the Savannah Port Complex, have a direct impact on Georgia's highway and rail networks. As such, the State of Georgia, in cooperation with the Coastal Area (Savannah) Metropolitan Planning Organization and Georgia Ports Authority, is pursuing several projects to accommodate and efficiently serve freight volumes moving throughout Georgia and the region.
7

For example, freight-supportive highway projects pursuing Federal funds are reflected in this FY 2015-2018 STIP document, as well as in the Savannah MPO's 2015-2018 TIP (which is incorporated via reference), to support the continued growth and activity expected at the Port of Savannah complex. The STIP is fiscally balanced such that it lists project phases expected for the fiscal year shown. It is worth noting that project schedules are subject to many issues and events between project conception and project conclusion that may impede or accelerate their progress. Project cost estimates are based on latest and best available engineering estimates at the time the STIP is being developed; the final cost for a project phase may be revised over time as the project is refined during its progression to construction.
Conclusion The Department of Transportation wishes to thank all of the citizens and local officials for taking the time to provide input on the development of this program. Comments and questions may be directed to the person listed on the inside front cover of the STIP.
8

Section II. Public Involvement Process

Background on the Statewide Transportation Improvement Program
Federal legislation requires that each state produce a Statewide Transportation Improvement Program (STIP). The STIP lists federally funded transportation projects for the next four years, and is updated and approved on an annual basis.
A major component of the STIP development process is public involvement. The Office of Planning oversees the STIP public involvement process for the six rural GDOT Districts and distributes the STIP to the Districts for use in their public meetings and meetings with local officials.

Public meetings
Annual public meetings are scheduled to provide an opportunity for public review and comment. All of the public meetings are held in ADA accessible locations. In 2014, ten public meetings were scheduled on the following dates:

August 25 Waycross August 26 Jasper August 28- Cartersville September 2 - Tifton September 4 Elberton

September 4 - Dublin September 8 - Americus September 9 - Statesboro September 9 - Thomson September 11 - LaGrange

The Department invites large numbers of customers to these meetings. The Department mailed over 3,000 individual invitations to local officials and the Family of Partners, a group of stakeholders with interest in transportation.
Ads were placed and press releases sent to local newspapers publicly announcing STIP meetings. Radio ads were aired and legal ads were placed in all Legal Organs in the state. An informational flyer explaining the STIP process has also been published and distributed at the public meetings.

9

Meetings with Local Officials
Every year as part of the STIP development process, the District Planning and Programming Engineers meet with the elected officials from each rural county in their area to discuss proposed projects in the STIP to solicit comments and questions. During these meetings, a range of transportation issues are discussed and requests are forwarded to the appropriate DOT office for response. Local officials sign a "Certification of Cooperation with Elected Officials" documenting STIP consultation.



STIP on the Web

The Department makes the STIP available to citizens on the Department's web page. The web address for the Georgia STIP is:
www.dot.ga.gov/stip
Contact information is also included on this site for citizen's comments.

Comments

Comments received from the public meetings and the meetings with locals are taken into consideration in the development of the STIP and any comments received are answered or forwarded to the appropriate GDOT office for response. The comments and questions received from the public meetings and the meetings with the local officials ranged from general comments such as the need for more public transit routes to project specific questions, such as when is a particular project scheduled for construction.

Additional Comments can be sent using the contact information below:

Mailing Address: Georgia Department of Transportation Attn: Office of Planning/STIP Project Manager 600 W. Peachtree ST NW Atlanta, Georgia 30308
Email: stipcoordinator@dot.ga.gov

In the fifteen previously established metropolitan areas of the state, public involvement is the responsibility of the local metropolitan planning organizations (MPOs); for questions about projects located in these areas, please contact the corresponding agency in Section V (following the MPO map). The area represented by the new Cartersville-Bartow County MPO, which was designated in 2013, will remain in the STIP until the new MPO adopts their initial transportation planning documents (TIP, LRTP).

10

Section III.
Georgia's Transportation Leadership

Governor Deal approved the STIP on September 15, 2014. The Governor

has taken an active role in ensuring the state has a plan that provides

vision, direction, and priorities by developing the Governor's Strategic

Goals for Georgia located on the following page. The Georgia DOT is currently governed by a 14-member State Transportation Board, which

Georgia Governor Nathan Deal

provides leadership and sets policies for the Department. The Board is

entrusted with powers that include, but are not limited to: naming the Commissioner; designating

which public roads are encompassed within the state highway system; approving long-range

transportation plans; overseeing the administration of construction contracts; and authorizing lease

agreements. Board Members are elected by a majority of a General Assembly caucus from each of

Georgia's fourteen congressional districts. Each board member serves a five-year term.

1st Congressional District 2nd Congressional District

Ann Purcell

Johnny Floyd

3rd Congressional District

4th Congressional District Robert L. Brown Jr.

Sam Wellborn

Secretary

5th Congressional District Stacey Key

6th Congressional District
Dan Moody

7th Congressional District
Rudy Bowen

8th Congressional District Jay Shaw

9th Congressional District Emily Dunn
Vice Chairman

10th Congressional District
Jamie Boswell

11th Congressional District Jeff Lewis

12th Congressional District
Don Grantham Chairman

13th Congressional District
Dana Lemon

14th Congressional District
Roger Williams

GDOT Commissioner Keith Golden

GDOT Planning Director Toby Carr

11

Section IV.
12

Section V.
Georgia Metropolitian Planning Organizations (MPO)

Chattanooga

Dalton

Cartersville Gainesville Rome

Atlanta

Athens

Augusta

Columbus

Macon Warner Robins

Albany Valdosta

0

25

50

100 Miles

Savannah Hinesville Brunswick


*Newly designated Cartersville-Bartow County MPO's project phases will remain in the STIP until the adoption of their initial transportation planning documents (TIP, LRTP).
13

Georgia Metropolitan Planning
Organization (MPO) Contact List
Albany (DARTS) Dougherty Area Regional Transportation Study Website: http://dartsmpo.org/ Address: Albany-Dougherty Planning/Comm. Dev.
240 Pine Avenue, Suite 300 Albany, Georgia 31701 Contact: Jennifer Newton, Transportation Planner Phone: (229) 446-2730 Email: jnewton@dougherty.ga.us ------------------------------------------------------------Athens (MACORTS) Madison-Athens-ClarkeOconee Transportation Study Website: www.macorts.org Address: Athens-Clarke Co. Planning Commission 120 W. Dougherty St. Athens, GA 30601 Contact: Sherry F. McDuffie, Transportation Planner Phone: (706) 613-3515 Email: macorts@athensclarkecounty.com --------------------------------------------------------------Atlanta (ARC) Atlanta Regional Commission Website: www.atlantaregional.com Address: 40 Courtland St. NE Atlanta, GA 30303 Contact: John Orr, Manager, Transportation Access and Mobility Division Phone: (404) 463-3265 Email: jorr@atlantaregional.com ------------------------------------------------------------Augusta (ARTS) Augusta Regional Transportation Study Website: www.augustaga.gov/index.aspx?nid=680 Address: Augusta Planning and Development Department 525 Telfair St. Augusta, GA 30901-5867 Contact: Paul DeCamp, Planning Director Phone: (706) 821-1796 Email: pdecamp@augustaga.gov --------------------------------------------------------------Brunswick (BATS) Brunswick Area Transportation Study Website: www.glynncounty.org/ Address: Glynn Co. Community Development 1725 Reynolds St, Ste. 200 Brunswick, GA 31520 Contact: Eric Johnson, Planning Manager Phone: (912) 554-7434 Email: ejohnson@glynncounty-ga.gov -------------------------------------------------------------

Chattanooga (CUATS) Chattanooga Urban Area Transportation Study Website: www.chcrpa.org Address: Chattanooga-Hamilton Co. Regional
Planning Agency 1250 Market St., Ste. 2000 Chattanooga, TN 37402-2713 Contact: Karen Rennich, MPO Coordinator Phone: (423) 643-5903 Email: rennich_karen@chattanooga.gov ------------------------------------------------------------Cartersville Bartow Bartow County Community Development Department Website: http://www.bartowga.org/index.php/communityservices/eviron-main/93-bartowadministration/community-development/675-mpo Address: 135 West Cherokee Avenue Suite 124 Cartersville, GA 30120 Contact: Toms Sills, Transportation Planner Phone: (770) 607-6265 Email: sillst@bartowga.org ------------------------------------------------------------Columbus (CPCTS) Columbus-Phenix City Transportation Study Website: www.columbusga.com/mpo/ Address: Columbus Dept. of Engineering Transportation Planning Division 420 10th St. Columbus, GA 31902 Contact: Lynda Temples, Planner Phone: (706) 225-3938 Email: ltemples@columbusga.org ------------------------------------------------------------Dalton Dalton MPO Website: www.whitfieldcountyga.com/eng/mpo.htm Address: Whitfield County 301 W. Crawford St., Dalton, GA 30722 Mailing: P.O. BOX 248 Dalton, Georgia 30722 Contact: Jacob Bearden, GDMPO Coordinator Phone: (706) 876-2592 Email: jbearden@whitfieldcountyga.com -------------------------------------------------------------
14

Gainesville (GHTS) Gainesville Hall Transportation Study Website: www.ghmpo.org Address: Hall County Government Center,
Department of Planning 2875 Browns Bridge Rd. Gainesville, GA 30504-5635 Contact: Sam Baker, Senior Planner Phone: (770) 531-6809x257 Email: sbaker@hallcounty.org -------------------------------------------------------------
Hinesville (HAMPO) Hinesville Area MPO Website:
http://thelcpc.org/HAMPO/hampo_index.html Address: Hinesville Area MPO
100 Main Street, Suite 7520 Hinesville, GA 31313 Contact: Nils Gustavson, Planner Phone: (912) 408-2030 Email: ngustavson@thelcpc.org ------------------------------------------------------------Macon (MATS) Macon Area Transportation Study Website: www.maconbibbpz.org Address: Macon-Bibb Co. Plan. & Zoning Comm. 682 Cherry St., Ste. 1000 Macon, GA 31201 Contact: Don Tussing, Principal Planner Phone: (478) 751-7460 Email: dtussing@mbpz.org ------------------------------------------------------------Rome (FRUTS) Floyd-Rome Urban Transportation Study Website:http://www.romefloyd.com/Infrastructure/ PlanningandZoning/tabid/333/Default.aspx Address: Rome-Floyd Co. Planning Commission PO Box 1433 Rome, GA 30162-1433 Contact: Sue Hiller, Executive Director Phone: (706) 236-5025 Email: shiller@romega.us ------------------------------------------------------------Savannah (CORE MPO) Coastal Region MPO Website: www.thempc.org Address: Metropolitan Planning Commission PO Box 8246 110 E. State St. Savannah, GA 31412-8246 Contact: Mark Wilkes, Dir. of Trans. Planning Phone: (912) 651-1477 Email: wilkesm@thempc.org -------------------------------------------------------------

Valdosta (VLMPO) Valdosta-Lowndes MPO Website: www.sgrc.us/transportation Address: Southern Georgia Regional Commission
327 West Savannah Ave. Valdosta, GA 31601 Contact: Corey Hull, Transportation Planner Phone: (229) 333-5277 Email: chull@sgrc.com ------------------------------------------------------------Warner Robins (WRATS) Warner Robins Area Transportation Study Website: http://www.wrga.gov/node/52 Address: Warner Robins Dept. of City Development 700 Watson Blvd. Warner Robins, GA 31093 Contact: Jessica Bird, Transportation Planner Phone: (478) 929-1936 Email: jbird@warnerrobingsga.gov -------------------------------------------------------------
*For additional information on Georgia's MPOs, Please visit the Georgia Association of Metropolitan Planning Organization's (GAMPO) website: www.gampo.org

15

Section VI.
Georgia Department of Transportation STIP Financial Plan
The Georgia Statewide Transportation Improvement Program (STIP) is developed in accordance with 23 Code of Federal Regulations (CFR) Section 450.216 and includes a priority list of highway, passenger rail and transit projects to be implemented (Section 630.106(a)(2)).
The following describes transportation program estimates which financially constrain by year the STIP Financial Plan (SFP) for Fiscal 2015-2018. In order to provide for 23CFR Section 630.110, "Modification of Original Agreements," for project phases authorized (Section 630.106(a)(2)) under a previous STIP, the SFP reserves a portion of the funding for this purpose and allocates the remaining transportation revenues to state and local projects for a four year time period. The financial plan includes projects for which funding can reasonably be expected to be available. Only those projects or project phases (scoping, preliminary engineering, rights-of way, utilities or construction) for highway projects or (capital or operating) for transit projects are included in the STIP.
The Fiscal 2015-2018 SFP was developed on the basis of current state and federal fund balances and projected 2015, 2016, 2017 and 2018 Federal-aid and state funding for each of the four years of the STIP. Also the Transportation Improvement Programs (TIP) and their related funding, developed by Georgia's fifteen Metropolitan Planning Organizations (MPO), are incorporated into the STIP by reference.
The Fiscal 2015-2018 SFP for highways and transit totals $8.62 billion with a FY 2015 annual program of $2.07 billion. Funding for this four-year program includes $5.86 billion in federal funds, $1.29 billion in state funds, and $1.47 billion in local funds. This level of infrastructure investment supports jobs in the construction industry as well as a well-maintained transportation system that fosters a healthy economy by providing the infrastructure for efficient movement of goods and people.
The project cost estimates used in developing the STIP are based on the best available engineering estimates at the time. Final cost for the actual project phase authorization may differ, right of way needs or design quantities are finalized through the pre-construction process. If changes due to these revisions alter the STIP description of intent, design, or scope of the project, then appropriate STIP amendment procedures, provided in this section, will be followed. Funds are also reserved for these amendments.
HIGHWAY PROGRAMS funded by MAP-21 (Moving Ahead for Progress in the 21st Century Act)
National Highway Performance Program (NHPP) Under MAP-21, the enhanced National Highway System is composed of rural and urban roads serving major population centers, intermodal transportation facilities and major travel destinations. It includes the Interstate System, all principle arterials, highways that provide motor vehicle access between the NHS and major intermodal transportation facilities, and the network of highways important to U.S. strategic defense (STRAHNET) and its connectors to major military installations. Moving forward it is anticipated as new principle arterials are identified, there will be a separate process/review to determine if they are NHS eligible.
16

Surface Transportation Program (STP) STP funds may be used the State and localities for projects to preserve or improve conditions and performance on any Federal-aid highway, bridge projects on any public road, facilities for nonmotorized transportation, transit capital projects and public bus terminals and facilities. The distribution of STP funds includes 50 percent for use in urban and rural areas of the state based on population. The remaining 50 percent can be used in any area of the state at the direction of the Department.
Highway Safety Improvement Program (HSIP) - The Highway Safety Improvement Program is a program to achieve a significant reduction in traffic fatalities and serious injuries on all public roads. Safety projects include Hazard Elimination, Railroad Crossing, and Railroad Protective Devices.
Congestion Mitigation/Air Quality (CMAQ) - These funds are for projects, which can be proven to reduce traffic congestion and/or improve air quality in non-attainment or maintenance areas. Projects such as intersection improvements, signal coordination, and ride sharing qualify for these funds. Currently, there are twenty eight counties in non-attainment or maintenance areas: Barrow, Bartow, Bibb, Carroll, Catoosa, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Floyd, Forsyth, Fulton, Gwinnett, Hall, Heard, Henry, Monroe, Murray, Newton, Paulding, Putnam, Rockdale, Spalding, Walker and Walton.
Transportation Alternatives Program (TAP) Established with MAP-21, this new program encompasses projects that were previously eligible activities under separately funded programs. Qualifying projects include transportation enhancement activities, recreational trails, safe routes to school, and planning, designing or constructing roadways within the right-of-way of former Interstate routes or other divided highways.
Demonstration or High Priority (Demo, HPP) These funds are congressionally authorized and designated for specified projects.
HIGHWAY FUNDING SOURCES
State Funding Sources - The $1.29 billion in State highway funds are available from several sources including motor fuel taxes, special fuel taxes (diesel), State Bonds and 3% state sales tax on gasoline. Eighty-two percent of these funds are used for construction and maintenance of state highways. Another eight percent are programmed for improvements to local roads. The remainder is not associated with a specific route. Revenues from these sources increase about one percent a year. State funds are part of the STIP program development, with about $1.11 billion used for federal match.
Federal Highway Funding Sources Federal highway funds in the STIP are estimated based on the Department's expectations of what Congress will authorize to be spent on the program. The Department expects to get at least $4.89 billion in federal highway funds over the next four years, from the Highway Trust and Other Funds and $1.24 billion from carryover funding from SAFETEALU and previous highway laws. Estimates are subject to change based on forthcoming yearly appropriation and obligation levels set by Congress.
17

Advance Construction (AC) Federal law allows states to borrow against future federal funding. Available state dollars are used to fund these projects until payments are made. These projects are then partially or completely converted to regular federal funds and the Federal Highway Administration billed for the federal portion of these payments. There are four projects in the STIP (PI # 0006367, 0006368, 0006369, 0009717) establishing amounts for conversion for debt service of GARVEE bond projects that were funded federal AC. Local Highway Funding Sources - During the four-year program, an estimated $1.21 billion in local funds will be needed to match federal-aid for local highway projects and for local contributions to matching improvements on the state highway system. Unobligated Balances Refers to Federal funding from prior years that have not had their Apportionments completely exhausted. These funds are still available to be used as part of the current year's Obligation Authority as well as the new Apportionments for the first year of this document.
18

Description

Summary of Highway Available Funds and Projects
($ Millions) FY 2015 FY 2016 FY 2017 FY 2018

Total funds available

$1,849

$1,827

$2,354

$1,645

Total highway projects

$1,834

$1,807

$2,329

$1,589

Reserve - modifications & amendments Reserve for AC conversions

$15

$20

$25

$56

$0

$0

$0

$0

Total $7,675 $7,559 $116
$0

Total Estimated Highway Funds and Available Spending Authority

($ Millions)

Category Groupings

FY 2015 FY 2016 FY 2017 FY 2018

Total

Apportionment National Highway Performance
Surface Transportation Highway Safety Improvement Congestion Mitigation Transportation Alternatives Total Apportionment Unobligated Balance Grand Total

$697
$330 $79 $65 $33 $1,204 $1,237 $2,441

$704 $334 $80 $66 $34 $1,218
$1,218

$710 $337 $81 $67 $34 $1,229
$1,229

$717 $340 $82 $67 $34 $1,240
$1,240

$2,828
$1,341 $322 $265 $135
$4,891 $1,237 $6,128

Available Federal Spending Authority Formula Obligation Ceiling
Special Limitation High Priority/Earmarks Special Limitation Appalachian Highway Forest Highway/Nat'l Parks
Other Federal Funds
Total Federal Funding Availability AC with State funds
State funds (including state bond) Local funds
Grand Total

$1,222 $31
$13
$0 $20 $1,286
$0 $420
$143 $1,849

$1,234 $38
$36
$0 $3 $1,311
$0 $289
$227 $1,827

$1,246 $41
$17
$0 $1 $1,305
$0 $294
$755 $2,354

$1,258 $6
$13
$0 $1 $1,278
$0 $287
$80 $1,645

$4,960 $116
$79
$0 $25 $5,180
$0 $1,290
$1,205 $7,675

19

FY 15 FY 18 Funding of Highway Projects: The $7.56 billion highway program for FY 20152018 includes $5.06 billion in federal-aid, $1.29 billion in state funds and $1.21 billion in local funds. The following table summarizes program funding for FY 2015-2018:

Fund Source
Federal Aid State Funds Local Funds Total Bond Funds (included in State and/or Local)

FY 2015-2018 Highway Projects ($ Millions)
FY 2015 FY 2016 FY 2017 FY 2018

Total

Average

FY 2015-2018 Annual

$1,271 $420 $143
$1,834 $158

$1,291 $289 $227
$1,807 $0

$1,280 $294 $755
$2,329 $4

$1,222 $287 $80
$1,589 $0

$5,064 $1,290 $1,205 $7,559
$162

$1,266 $323 $301
$1,890 $41

Program Distribution (Federal Aid $) * NHPP

$68

$35

$171

$178

$452 $113

STP

($100)

($112)

($224)

($252)

($688) ($172)

Safety

$3

($2)

$3

($1)

$3

$1

CMAQ

($36)

$31

$30

$45

$70

$18

Transportation Alt.

$27

$32

$32

$32

$123

$31

IM

$0

($1)

($1)

$0

($2)

($1)

NHS

$0

($18)

($40)

$0

($58) ($15)

* The negative balances represent the over programming of a particular fund source, but the overall program maintains financial constraint. Funding from other categories may be transferred to cover the additional projects.

FY 2015-2018 Summary of Highway Projects by MPO Area *

2015

2016

2017

2018

Albany

$45,000

$227,070

$8,768,896

$1,324,412

Athens

$35,063,924

$0

$56,308

$0

Atlanta TMA

$638,330,590

$629,097,909 $1,199,494,547 $538,761,601

Augusta TMA

$22,092,335

$12,131,329

$8,968,926

$30,000

Brunswick

$0

$0

$5,208,292

$0

Chattanooga TMA

$12,123,266

$28,814,957

$1,001,500

$0

Columbus TMA

$24,247,001

$467,450

$3,080,919

$0

Dalton

$2,158,842

$15,584,920

$0

$0

Gainesville

$25,639,046

$67,878,244

$48,582,384 $21,888,042

Hinesville

$2,774,075

$11,457,769

$0

$2,644,000

Macon

$52,252,697

$14,461,282

$52,283,194

$2,381,671

Rome

$26,214,251

$12,651,323

$57,172,054

$0

Savannah TMA

$34,558,384

$33,423,085

$11,060,759 $95,648,673

Valdosta

$0

$56,454,174

$31,863,305

$0

Warner Robins

$0

$173,747

$5,016,014

$0

MPO Total

$875,499,411

$882,823,259 $1,432,557,098 $662,678,399

Rural Area State Total

$959,055,896

$923,634,650

$896,569,051 $926,671,576

$1,834,555,307 $1,806,457,909 $2,329,126,149 $1,589,349,975

* excludes Transit projects

Total $10,365,378 $35,120,232 $3,005,684,647 $43,222,590
$5,208,292 $41,939,723 $27,795,370 $17,743,762 $163,987,716 $16,875,844 $121,378,844 $96,037,628 $174,690,901 $88,317,479
$5,189,761 $3,853,558,167 $3,705,931,173 $7,559,489,340
20

Moving Ahead for Progress in the 21st Century Act Title 3 programs Transit, passenger rail, aviation, freight rail and ports join highways as significant modes in Georgia's intermodal transportation system. Non-highway modes funded through Title 3 or through moneys flexed from Title 1 are part of the STIP. Because of its importance to the state's transportation program, a comprehensive summary of non-highway modal programs, funded with other than MAP-21 funding and administered by the Georgia Department of Transportation is included in this document.
TRANSIT PROGRAMS
The Georgia Department of Transportation (GDOT) in cooperation with the Federal Transit Administration (FTA) and the state's public transit agencies work together to develop service programs and facility improvements to meet the state's public transportation needs.
One of the missions of GDOT's public transit program is to preserve and enhance the state's facilities and equipment in urban and rural public transit. Public transit projects listed in the STIP are funded with Federal Transit Administration funds (under SAFETEA-LU and MAP-21). These projects have been identified by the MPOs through the transportation planning process and become a part of the Transportation Improvement Programs (TIP) in urban areas. The Department in cooperation with rural transit operators identifies rural needs. Urban transit projects are listed for cities with transit programs in operation - Albany, Athens, Atlanta, Augusta, Columbus, Gainesville, Hinesville, Macon, Rome and Savannah.
Typical urban transit projects include urban capital, planning, and operating (Section 5307) and statewide elderly/disabled capital (Section 5310) projects. GDOT is the designated recipient of FTA funds for areas under 200,000 population. The Department receives financing from the State's General Fund budget to match up to one-half of the local share of transit capital projects in Albany, Athens, Gainesville, Hinesville, Macon and Rome. In addition, the Department coordinates with the Georgia Department of Human Services (GDHS) on transportation projects for the elderly and disabled population. Atlanta, Augusta, Savannah and Columbus have populations of over 200,000 and receive transit federal funds directly from FTA. The Department also provides up to one-half the local share of matching funds for capital projects in these areas. Within the constraints of the state budget, the Department provides financial assistance to match projects for Cobb Community Transit (CCT), the Gwinnett County Transit, the Metropolitan Atlanta Rapid Transit Authority (MARTA) and Douglas County.
Transit Programs include:
Urbanized Area Formula Program FTA Section 5307 provides funding for capital, operating and planning assistance. Funds are distributed nationwide on a formula basis.
Fixed Guideway Capital Investment Grants (In lieu of current Bus Discretionary Program, a new formuala Bus and Bus Facilities Program (5339) is established in MAP21) FTA Section 5309 provides capital funds for modernization of existing rail systems (Modified from the New Starts/Small Starts program)
21

Enhanced Mobility of Seniors and Individuals with Disabilities Program FTA Section 5310 supports the capital costs of transportation services for older adults and people with disabilities.
Formula Grants for Rural Areas Program FTA Section 5311 provides funding to enhance the access of people in non-urbanized areas to healthcare, shopping, education, employment, public services and recreation. Funds are available for capital, operating and administrative expenses. This program also includes the Rural Transit Assistance Program for State DOTs (Section 5311(b)(3) which provides funding for training, technical assistance projects, research and other support services for rural transit operations. The Section 5311 Program also includes a 15% set-aside for capital support for the private intercity bus operators (Section 5311(f)).
Job Access and Reverse Commute Program (Repealed and consolidated within FTA Section 5307 and 5311 programs). FTA Section 5316 funds remaining under SAFETEALU provides formula funding to States and Designated Recipients to support the transport of welfare recipients and low income recipients to and from jobs and activities related to their employment including reverse commute projects.
New Freedom Program (Repealed and consolidated within FTA Section 5310 program). 5317 funds remaining under SAFETEA-LU provides funding to support public transportation services beyond those required by the Americans with Disabilities Act of 1990 (ADA) to assist individuals with disabilities with accessing transportation services, including transportation to and from jobs and employment support services.
Transit Asset Management FTA Section 5326 provides new requirements for transit asset management by FTA's grantees as well as new reporting requirements to promote accountability.
State Safety Oversight FTA Section 5329 provides authority to establish and enforce a new comprehensive framework to oversee the safety of public transportation throughout the United States as it pertains to heavy rail, light rail, buses, ferries, and streetcars.
State of Good Repair Grants FTA Section 5337 is dedicated to repairing and upgrading the nation's rail transit systems along with high-intensity motor bus systems that use highoccupancy vehicle lanes, including bus rapid transit (BRT).
Bus and Bus Facilities FTA Section 5339 provides capital funding to replace, rehabilitate and purchase buses and related equipment and to construct bus-related facilities.
***The funds authorized and appropriated for repealed SAFETEA-LU programs are available for obligation (and expenditure) through their authorized period of availability, unless and until Congress takes action directing otherwise. Programs falling under this category include the Clean Fuels Grant Program, Job Access and Reverse Commute, New Freedom, Transit in the Parks, Alternatives Analysis, Bus and Bus Facilities, Fixed Guideway Modernization, and Over-the-Road Bus Program. These programs expired on September 30, 2012 and no new funding is authorized beyond fiscal year 2012.
22

TRANSIT FUNDING SOURCES
State Funding Sources The State Legislature provides up to one-half of the required twenty percent match for federal transit funding through the General Fund. Approximately $6 million in General Funds for transit purposes are programmed in the STIP.
Federal Transit Funding Sources The $796 million in federal funds is partially based on estimates of federal revenue available to Georgia through the Transit Trust Fund and from earmarked funds in SAFETEA-LU.
Local Transit Funding Sources During the four-year program, an estimated $260 million in local funds will be needed to match federal funds. These funds are acquired through local sales taxes, special taxing districts, property taxes as well as the general tax digest.

New Safety Authority (5329)

Summary of Transit Programs as a result the MAP-21 (Moving Ahead for Progress in the 21st Century)

MAP-21 Program Changes

Repealed Clean Fuels Grants (5308)

Consolidated Urbanized Areas Formula
Grants (5307) [JARC]

Modified
Fixed Guideway Capital Investment Grants (5309)

State of Good Repair Gant (5337)
Asset Management (5326)

Job Access and Reverse Commute (5316) [JARC]
New Freedom Program (5317)

Enhanced Mobility of Seniors and Individuals with Disabilities (5310)
[New Freedom]
Rural Area Formula Grants (5311) [JARC]

Metropolitan and Statewide Planning (5303
&5304)
Research Development, Demonstration, and Deployment (5312)

Bus and Bus Facilities (5339)

Paul S. Sarbanes Transit in the Parks (5320)

Public Transportation Emergency Relief (5324)
TOD Planning Pilot
Grants (20005(b) of MAP-21)

Alternatives Analysis (5339)
Over-the-Road Bus (Sec. 3039 - TEA-21)

Technical Assistance and Standards (5314)
Human Resources and Training (5322)

23

Fund Source
Federal Funds State Funds Local Funds Total

FY 2015-2018 Transit Projects ($ Thousands)

FY 2015
$177,984 $1,943 $54,838
$234,765

FY 2016
$195,703 $1,142 $64,786
$261,631

FY 2017
$233,272 $1,356 $69,897
$304,525

FY 2018
$188,966 $1,200 $71,026
$261,192

Total FY 2015-2018
$795,925 $5,641
$260,547 $1,062,113

Annual Average
$198,981 $1,410 $65,137
$265,528

The following new projects have been added to the STIP in FY2015:
1. $1.3M (100% Federal funded) ARRA for the acquisition of the Macon Maintenance Facility 2. $210K (Federal) for Veterans Transportation & Community Living Initiative (VTCLI); $40K
Local 3. $463,947 (Federal) Ben Hill County Transit Start-up in FY2015; $28,960 State; $261,228
Local 4. $87,077 (Federal) Brantley County Transit Start-up in FY2015; $5,248 State; $50,338
Local. 5. $58,263 (Federal) Meriwether County Transit Start-up FY2015; $-0- State; $58,264 Local 6. $862,681 (Federal) GDOT Intermodal SSO Program; $215,670 State

24

Estimated Transit Funds by Program - FY 2015-2018 ($ Thousands)

Category
Metropolitan Planning (5303) Urbanized Area Formula Program (5307) Capital Urbanized Area Formula Program Operating (5307) Enhanced Mobility of Seniors and Individuals with Disabilities (5310) Formula Grants for Rural Areas Program (5311) Capital Formula Grants for Rural Areas Program (5311) Operating Intercity Bus Program (5311f) State Safety Oversight (5329) State of Good Repair (5337) Bus & Bus Facilities (5339) Other Transit Projects Total Apportionment

FY 2015 FY 2016

$0 1$81,688
$6,289
$3,820

$0 $81,894
$15,382
$1,439

2$9,028 3$25,864

$6,555 $28,744

$2,574 4$999 $87,676 $16,532 $295 $234,765

$1,569 $999
$105,211 $19,838
$0 $261,631

FY 2017
$0 $97,055
$10,110
$2,060
$7,866
$34,493
$1,882 $999
$126,254 $23,806
$0 $304,525

FY 2018
$3,190 $5,843
$17,510
$3,890
$2,977
$52,400
$2,008 $0 $0 $0
$173,374 $261,192

Total FY 2015-2018
$3,190 $266,480
$49,291
$11,209
$26,426
$141,501
$8,033 $2,997 $319,141 $60,176 $173,669 $1,062,113

1Macon Maintenance Facility Acquisition ($1.3M) is being added in FY2015 which increases this apportionment 2Capital for the Veterans Transportation & Community Initiative and new rural county transit startups (Ben Hill, Brantley and Meriwether) increases this apportionment 3Operating funding for new rural county transit startups (Ben hill, Brantley and Meriwether) increases this apportionment 4Decrease in State Safety Oversight (SSO) funding in FY 2015 reduces this apportionment 5Apportionment increased due to the construction of the Albany Multimodal Transit Center

25

AVIATION PROGRAMS
The mission of GDOT's aviation program is to preserve and enhance the State's air transportation system to meet the demands of users. The program provides financial and technical support to publicly owned, open to the public airports. The Georgia Department of Transportation is authorized to plan and support the establishment, development and maintenance of aviation and aviation facilities. The Georgia Airport Aid Program (GAAP) provides state funding assistance, appropriated by the Georgia General Assembly, for capital, maintenance, approach aid and planning projects. Development, Maintenance, Approach Aid, and Planning projects are funded at 75% state assistance or 50% state assistance for urban area airports lacking federal support. All FAA (Federal Aviation Administration) supported construction projects may be funded at 95% FAA and 2.5% state aid. Airport markings on State development projects are eligible for 100% funding. In addition, the minimum contract level of state funding assistance on all GAAP projects is $1,500. State projects (non-federal) are selected annually based on the GAAP Priority System criteria. Federally funded projects have the highest priority for matching state funds.
RAIL PROGRAMS
The primary mission of GDOT's rail program is to preserve and enhance the State's rail transportation system for future development and expansion of rail freight and rail passenger service. Existing rail corridors in the Department's Freight Rail Plan are identified to be either acquired and rehabilitated, or rehabilitated, in order to maintain and assure strategic rail freight access to Georgia's communities. Since 1992, GDOT has acquired 540 miles of light density railroad lines and since 1981, GDOT has rehabilitated 793 miles of light density railroad lines.
The passenger rail program defined in the document titled: Intermodal Program for Rail Passenger Service in Georgia, guides implementation of intrastate, intercity, and commuter rail passenger service to provide a multi-modal alternative in the State's largest travel market. Seven (7) commute services and six (6) intercity rail lines are identified in the Program to serve and connect together the Atlanta, Athens, Griffin, Macon, Bremen, Canton, Senoia, Albany, Savannah, Augusta, and Columbus metropolitan markets.
PORT PROGRAMS
The mission of GDOT's ports program is to partner with the Corps of Engineers to maintain the navigability of the Atlantic Intracoastal Waterway and Georgia's deepwater ports in Savannah and Brunswick. In order to maintain a navigable channel, the Corps of Engineers dredges the Savannah and Brunswick Harbors annually. The Department's role is to partner with the Corps to provide dredge material containment areas for the Corp's work for the federal navigation projects. The Department is required to cost/share in dike design, construction, and environmental mitigation. GDOT funds 35% of dike construction costs but no maintenance costs of disposal areas. GDOT annually requests funding from the Georgia General Assembly to cover the costs of these activities.
26

Statewide Transportation Improvement Program (STIP) and Transportation Improvement Program (TIP) Amendment Process
The Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) issued the Final Rule to revise the Statewide and Metropolitan Transportation Planning regulations incorporating changes from the Moving Ahead for Progress in the 21st Century Act (MAP-21) with an effective date of July 2012. The revised regulations clearly define administrative modifications and amendments as actions to update plans and programs. 23 Code of Federal Regulations (CFR) Part 450.104 defines administrative modifications and amendments as follows:
Administrative modification "means a minor revision to a long-range statewide or metropolitan transportation plan, Transportation Improvement Program (TIP), or Statewide Transportation Improvement Program (STIP) that includes minor changes to project/project phase costs, minor changes to funding sources of previously-included projects, and minor changes to project/project phase initiation dates. Administrative Modification is a revision that does not require public review and comment, redemonstration of fiscal constraint, or a conformity determination (in nonattainment and maintenance areas)."
Amendment "means a revision to a long-range statewide or metropolitan transportation plan, TIP, or STIP that involves a major change to a project included in a metropolitan transportation plan, TIP, or STIP, including the addition or deletion of a project or major change in project cost, project/project phase initiation dates, or a major change in design concept or design scope (e.g., changing project termini or the number of through traffic lanes). Changes to projects that are included only for illustrative purposes do not require an amendment. An amendment is a revision that requires public review and comment, redemonstration of fiscal constraint, or a conformity determination (for metropolitan transportation plans and TIPs involving "non-exempt" projects in nonattainment and maintenance areas). In the context of a long-range statewide transportation plan, an amendment is a revision approved by the State in accordance with its public involvement process."
The following procedures have been developed for processing administrative modifications and amendments to the STIP and Metropolitan Planning Organizations (MPOs) TIPs and Long Range Transportation Plans (LRTPs). Processes described below detail procedures that are to be used to update an existing approved STIP or TIP and associated plan, if applicable. A key element of the amendment process is to assure that funding balances are maintained.
27

Administrative Modifications for Initial Authorizations The following actions are eligible as Administrative Modifications to the STIP/TIP/LRTP:
A. Revise a project description without changing the project scope, conflicting with the environmental document or changing the conformity finding in nonattainment and maintenance areas (less than 10% change in project termini). This change would not alter the original project intent.
B. Splitting or combining projects. C. Federal funding category change. D. Minor changes in expenditures for transit projects. E. Roadway project phases may have a cost increase less than $2,000,000 or 20% of the amount
to be authorized. F. Shifting projects within the 4-year STIP as long as the subsequent annual draft STIP was
submitted prior to September 30. G. Projects may be funded from lump sum banks as long as they are consistent with category
definitions. An administrative modification can be processed in accordance with these procedures provided that:
1. It does not affect the air quality conformity determination. 2. It does not impact financial constraint. 3. It does not require public review and comment. The administrative modification process consists of a monthly list of notifications from GDOT to all involved parties, with change summaries sent on a monthly basis to the FHWA and FTA by the GDOT. The GDOT will submit quarterly reports detailing projects drawn from each lump sum bank with remaining balance to the FHWA.
28

Amendments for Initial Authorizations
The following actions are eligible as Amendments to the STIP/TIP/LRTP: A. Addition or deletion of a project. B. Addition or deletion of a phase of a project. C. Roadway project phases that increase in cost over the thresholds described in the Administrative Modification section. D. Addition of an annual TIP. E. Major change to scope of work of an existing project. A major change would be any change that alters the original intent i.e. a change in the number of through lanes, a change in termini of more than 10 percent. F. Shifting projects within the 4-year STIP which require redemonstration of fiscal constraint or when the subsequent annual draft STIP was not submitted prior to September 30. (See Administrative Modification item F.)
Amendments to the STIP/TIP/LRTP will be developed in accordance with the provisions of 23 CFR Part 450. This requires public review and comment and responses to all comments, either individually or in summary form. For amendments in MPO areas, the public review process should be carried out in accordance with the procedures outlined in the Participation Plan. The GDOT will assure that the amendment process and the public involvement procedures have been followed. Cost changes made to the second, third and fourth years of the STIP will be balanced during the STIP yearly update process. All amendments should be approved by FHWA and/or FTA. Notes:
1. The date a TIP becomes effective is when the Governor or his designee approves it. For nonattainment and maintenance areas, the effective date of the TIP is based on the date of U.S. Department of Transportation's positive finding of conformity.
2. The date the STIP becomes effective is when FHWA and FTA approve it. 3. The STIP is developed on the state fiscal year which is July 1-June 30. 4. Funds for cost increases will come from those set aside in the STIP financial plan by the
GDOT for modifications and cost increases. Fiscal Constraint will be maintained in the STIP at all times.
29

Additional Funding Request After the Initial Authorization Additional funding requests for all phases after the receiving initial authorization for those phases shall be a modification and be reported at each month's end except under the following conditions:
A. The Initial Work Authorization for the phase is older than 10 years. B. The additional funding request exceeds the Initial Work Authorization by greater than $10
million.
30

FHWA/GDOT PE and Right of Way FMIS Authorization Policy
Requirements for Additional PE Submittals: These policies pertain to FMIS modifications incurred after the initial authorization. The initial authorization must be programmed in the applicable TIP/STIP to receive funding. The FHWA Georgia Division reserves the right to deny the FMIS modification request regardless of whether it meets the below requirements. Additional funding requests for PE phases after the receiving initial authorization shall be a modification and be reported at each month's end. Any requests not meeting the below expectations or appear to not be a candidate for additional funds through a FMIS modifications shall be required to have programming in the current planning document updated to reflect the request. Mitigation phases added as a FMIS modification will not be approved and must be programmed separately.
If any requests fall outside of the below guidelines the request will need to be programmed in the current planning document.
The Initial Work Authorization for the phase is older than 7 years.
The additional funding request exceeds the Initial Work Authorization by greater than $2,000,000 or 20% of the amount of the initial authorization, whichever is greater.
Requirements for all ROW Submittals: Every project presented to FHWA for right of way funding authorization must be listed in the current STIP/TIP. All FMIS requests need to be based on a current GDOT ROW cost estimate. All projects must have approved current/accurate Right of Way plans. All projects must have a current approved NEPA document.
ROW Phase under $15 million Right of Way Project authorizations under $15 million must be programmed in a single year through the current STIP/TIP and be authorized fully in that same year.
Split Funded Project over $15 million Right of Way projects over $15 million may be split funded in two phases that are programmed in consecutive years. Final Right of Way phase must not fall in the same fiscal year as construction. A minimum of 40% of all funding must be in the first year of authorization.
If Additional Right Of Way Funds are Needed If additional Right of Funds are needed for the following situations: 1) Condemnation over runs, 2) Change in cost estimate due to change in scope or significant plan changes an amount up to 20% of original cost estimate may be authorized immediately with documentation of where the funds were obtained from in the GDOT program to follow within 30 days to the FHWA Georgia Division Office. If an amount is needed over 20% of the original ROW cost estimate, or for reasons other than stated above, FHWA and GDOT will deal with these issues on a case by case basis. Documentation of where the funds were obtained from will be forwarded to the Georgia FHWA Division office within 30 days of approval.
31

Section VII.
LUMP SUM FUNDING A portion of the STIP funding is set aside for eleven groups of projects that do not affect the capacity of the roadway. The Lump Sum projects program is intended to give the Department and MPO flexibility to address projects of an immediate need while fulfilling the requirements of the STIP. Funds are set up in lump sum banks to undertake projects that are developed after the STIP is approved. These lump sums banks, located in the statewide or "All" county section of the STIP, are listed in a number of funding types for each year for the Department's convenience in managing and accounting for the funding. These Lump Sum Banks are shown in the TIP/STIP with the words "Lump Sum" in the project description and contain an amount of funding for each year. Funds are drawn from these lump sums during the year and individual projects are programmed. The individual projects may include work at one or several locations for letting and accounting purposes. Listed below are these eleven groups and information about them. Except for groups for preliminary engineering and rights of way protective buying, the total available funds are shown as construction for easy accounting but preliminary engineering and rights-of-way may be drawn from this amount when needed in that category.
Individual projects are programmed and funds drawn from the Lump Sum Bank at the time these funds are needed for Preliminary Engineering, Rights of Way and Construction. These projects may be funded in the current year or one of the other TIP/STIP years. Funds for these projects are not counted until authorization is requested for the funds. At that time the actual cost is deducted from the balance in the Lump Sum Bank.
To provide the readers of the TIP/STIP with as much information as possible, individual projects to be funded from the Lump Sum Bank in the future may be shown in the TIP/STIP with a program year of 2015 and a preliminary estimated cost. These projects are also denoted with the words "Uses Lump Sum Bank PI # 000xxxx" in the lower left area of the project listing. To avoid double counting, these projects are not included in the county total at the end of the county.
Group: Maintenance
Criteria: existing system maintenance only
This group has six funding/work types: two are for bridge painting/maintenance and the other four are for roadway maintenance. Major types of work undertaken are: resurfacing, pavement rehabilitation, median work, impact attenuators, signing, fencing, pavement markings, landscaping, rest areas, walls, guardrail and shoulder work. Also included is preliminary engineering necessary to prepare plans and rights-of-way needed for work such as landslide repair, sewer hookups and erosion control.
Group: Safety
Criteria: work qualifying for the High Hazard Safety Program and other safety projects
This group includes the following work types: signal installation/upgrades, guardrail installation, sign installation, railroad protection devices, operational improvements, railroad crossing hazard elimination, roadway hazard elimination and special safety studies and programs.
32

Group: Preliminary Engineering
Criteria: planning, studies and management systems This group is a single item
Group: Roadway/Interchange Lighting
Criteria: lighting This group is a single item.
Group: Rights of Way - Protective Buying and Hardship Acquisitions
Criteria: purchase of parcel(s) of rights of way (RW) for future projects that are in jeopardy of development and for hardship acquisition. Qualifying projects are those that have preliminary engineering (PE) underway or have a PE, RW or construction phase in the STIP. For counties that are not in conformance for air quality the only qualifying projects are those that have a RW phase in the STIP. This group is a single item.
Group: Transportation Enhancement
Criteria: projects qualifying for the Transportation Enhancement program (TE) and the Recreational Trails & Scenic Byway programs
TE projects shown in the STIP will be funded on a first come first served basis. When a project is funded it is drawn down from the lump sum. When all funds are gone, no other projects can be funded until the next fiscal year, which begins on July 1.
This group has two funding types.
Group: Transportation Alternatives Program (TAP)
Criteria: TAP provides funding for programs and projects defined as transportation alternatives, including on- and off-road pedestrian and bicycle facilities, infrastructure projects for improving non-driver access to public transportation and enhanced mobility, community improvement activities, and environmental mitigation; recreational trail program projects; safe routes to school projects; and projects for planning, designing, or constructing boulevards and other roadways largely in the right-of-way of former Interstate System routes or other divided highways. Consistent with what is allowed in the MAP-21 legislation, GDOT reserves the right to transfer 50% of available TAP funds to one of the most flexible funding categories available. Those dollars may be spent on any federal-aid eligible project to permit GDOT to focus on delivering the long-needed transportation improvements that support the safe and efficient movement of people and goods, in the most cost-effective manner.
The remaining 50% of TAP funds consists of dollars sub-allocated to MPOs over 200,000 in population as well as TAP funds held at State DOTs eligible for use in areas below 200,000 populations. Projects selected to receive these funds must be the result of a competitive selection process. This group has two funding types.
33

Group: Livable Centers Initiative (LCI) Criteria: projects qualifying for the LCI program and selected by the Atlanta Regional Commission (ARC) LCI implementation projects are selected on a competitive basis and lump sum funding amounts are programmed according to reasonable schedules for engineering, right of way acquisitions and construction for projects comprising the overall program. Funding for individual phases of a project may be shifted between fiscal years as necessary if such shifts do not affect the implementation schedule of other projects or exceed the overall lump sum funding amount. This group is a single item.
Group: Safe Routes to Schools Criteria: To enable and encourage children, including those with disabilities, to walk and bicycle to school; to make walking and bicycling to school safe and more appealing; and to facilitate the planning, development and implementation of projects that will improve safety, and reduce traffic, fuel consumption, and air pollution in the vicinity of schools. This group has three items; Infrastructure & non-infrastructure & any project.
Group: High Risk Rural Roads
Criteria: States are required to identify these roadways (and expend the HRRR funds) according to the following definition: any roadway functionally classified as a rural major or minor collector or a rural local road and
A. on which the accident rate for fatalities and incapacitating injuries exceeds the statewide average for those functional classes of roadway; or
B. that will likely have increases in traffic volume that are likely to create an accident rate for fatalities and incapacitating injuries that exceeds the statewide average for those functional classes of roadway."
34

Group: Regional Traffic Signal Optimization
Criteria: Applies to maintenance and operation of traffic control devices statewide. Candidate projects include:
A. Regional Traffic Operations Concepts B. Micro-Regional Traffic Operations C. Traffic Control Maintenance Contracts D. Signal Timing E. Identification of minor operational improvement projects to be submitted fir Operational
Projects under another Lump Sum category.
Projects will:
A. Have to support the Regional or Statewide Traffic Signal Concept of Operations B. Focus on operating and maintaining the components of traffic control systems C. Local or quasi-governmental agencies may be contracted with at the project level. D. on which the accident rate for fatalities and incapacitating injuries exceeds the statewide
average for those functional classes of roadway; or that will likely have increases in traffic volume that are likely to create an accident rate for fatalities and incapacitating
Group: Low Impact Bridges
Criteria: Candidates for this process will require minimal permits, minor utility impacts, minimal FEMA coordination, no on-site detour, and meet other low-impact characteristics as identified in this document. Projects that ultimately qualify for this expedited process also must not exceed established environmental impact thresholds and thus qualify as a Categorical Exclusion (CE) determinations in compliance with the National Environmental Policy Act (NEPA). The Program has been created with three major principles in mind safety, stewardship and streamlining.
The safety of the travelling public is of paramount importance. It is the intent of this program to reduce risk associated with structurally deficient, scour critical, temporarily shored, or fracture critical structures.
Second only to safety, the program will foster stewardship of Georgia's environmental and financial resources. Projects developed under the Program will seek to minimize the impact to the natural environment while providing long-term cost effective engineering solutions.
The Program will result in accelerated, streamlined delivery of all phases of the bridge replacement including, planning, design, environmental approval and construction.
35

The MPO Lump Sum Process
The types of projects that the Department programs with lump sum funding have always adhered to the Federal Regulations set forth in 23 CFR 450.216 (9) b, which states "(for STIP) projects that are not considered to be of appropriate scale for individual identification in a given program year may be grouped by function, work type, and/or geographic area using the applicable classification under 23 CFR 771.117 (c) and (d) and/or 40 CFR part 51.". The Department's lump sum projects also follow the guidelines set forth in 23 CFR 771.117 (c) and (d). The Lump Sum program is intended to give the Department and MPO the flexibility to address projects of an immediate need while fulfilling the requirements of the STIP.
Every year as the TIP development process begins, each MPO is provided with funding information for the Lump Sum "banks". The Lump Sum banks identified for the MPOs are part of a larger series of Statewide Lump Sum banks. The purpose of showing these Lump Sum banks in the TIPs is to allow for projects that are more "routine" or "minor" to be shown in the TIPs therefore allowing for the funds to be authorized without the need for administrative actions by the MPO.
In an effort to allow for increased transparency in the Lump Sum Program for the MPO areas, several changes in the program will be implemented. These changes include the distribution of the Lump Sum Banks by a population-based formula, establishment of new procedures for revising the distributions levels, and timely and consistent reporting methods for identifying the projects programmed and let against the banks for each MPO. It is with the implementation of these additional efforts we believe that a higher level of transparency will be achieved and maintained.
Beginning with the annual development of each MPO TIP, each MPO shall receive for each Lump Sum bank that they qualify for, the funding amounts as calculated by the most current census information available. The share will be calculated using the MPO's percentage of entire population of the state including the rural areas. Currently those distributions are as follows:

MPO Albany Athens Atlanta Augusta Brunswick Chattanooga Columbus Dalton Gainesville Hinesville Macon Rome Savannah Valdosta Warner Robins MPO Total Rural Total

2010 Census 1.24% 1.57%
49.74% 3.19% 0.82% 1.03% 2.08% 1.06% 1.85% 0.73% 1.73% 0.99% 2.74% 1.14% 1.53%
71.44% 28.56%

36

In the event an MPO exhausts any one annual Lump Sum bank capacity and it becomes necessary to increase the Lump Sum bank, the MPO may move future years Lump Sum bank funding in the TIP of a like kind to the current year. Constraint will be maintained from the annual set aside of obligation authority for modifications. Reporting of the projects that are programmed from these Lump Sum banks will consist of two delivery methods. The first method will consist of two Lump Sum Reports posted on the GDOT external website. The first report will list projects and financial information by Lump Sum bank. The user may select the Lump Sum bank of interest and "real time" project information for all projects funded from that Lump Sum bank for the current fiscal year will be listed. The report shall also include the beginning balance for the Lump Sum bank and its current balance and at the end of the fiscal year, a complete report of the usage and shifts made to the Lump Sum bank will be posted on the webpage. The second report will be by MPO where a user may select the MPO of interest and a "real time" MPO Lump Sum bank usage will be generated that will show project information for all projects programmed for all Lump Sum banks for the MPO in the current fiscal year. The Department will request that each MPO setup a link from their website to these reports to provide another access point to the reports as well. The second delivery method will consist of the reviewing of the Lump Sum banks and projects authorized and let within the MPO area at the regularly scheduled Technical Coordinating Committee and Policy Committee meetings. The same versions of the reports as described earlier will be used to convey this information. With these additional changes to the Lump Sum Program, the Department will be able to provide another level of transparency and at the same time provide each MPO with the most accurate and current information possible. The Department remains committed to providing a responsive Lump Sum program with a transparent, streamlined reporting process.
37

Section VIII.
38

Debt Service for GARVEE
$749,672
Intermodal/Transit
$1,062,112
Other
$892,317
Environmental Improvements
$3,600
Bridge Rehab Added Capacity
$807
$150,202
Bridge Replacement Added Capacity
$ in Thousands

STIP Funds by Category for
2015 - 2018 Total Funds $8.62 Billion

Reconstruction No Added Capacity
$44,525

Restoration, Rehab & Resurfacing
$608,138

Minor Widening
$86,609 Bridge Replacement
No Added Capacity
$532,004
Safety Improvements
$56,023

Bridge Rehab No Added Capacity
$614,308

Traffic Management/Engineering
$283,142

$1,439,336
Major Widening

$33,262
Relocation Added Capacity

$351,513
Construction
New Roads

$1,573,808
Reconstruction Added Capacity

$140,223
Construction New Bridges

Project description

Type of work, see Appendix A Glossary of Terms for further definitions.

This is the PI or Project Identification number used throughout the life of the project for tracking purpose.

Understanding STIP Entries

List of the different phases involved in a particular project. Potential phases include: Scoping, Preliminary Engineering, Rights of way, Utilities, and/or Construction.

Total cost of funding for each phase of work.
The status of when work is scheduled to begin, or when the funds were authorized .

Section IX.
39

Total amount previously authorized, i.e. funds spent on the project

Total cost, authorizations plus funds not yet authorized .

Preliminary parcel count anticipated for ROW phase.

Identify government participation (Federal, State, or Local) in funding each phase of project.

Project Details: Describes the purpose and anticipated benefits of the project.

Funding Category: May be Bridge, STP, NHS, etc. & refers to specific Category of funds to be used.

Section X.

State of Georgia

Outline Map Showing Counties

Dade Catoosa WhitfieldMurray
Walker

Fannin Gilmer

Chattooga

Gordon Pickens

Towns Rabun Union

WhiteHabersham

Lumpkin

Stephens

Floyd

Bartow

Dawson Cherokee Forsyth

Hall Banks Franklin Hart

Jackson Madison Elbert

Polk Paulding Cobb

Gwinnett Barrow Clarke Oglethorpe

Haralson Carroll Heard

DeKalb

Oconee Walton

Wilkes Lincoln

Douglas Fulton

Rockdale

Clayton

Morgan Newton

Greene Taliaferro

Columbia

Coweta

Henry Fayette
Spalding Butts

Jasper

Putnam

McDuffie Warren
Hancock Glascock

Richmond

Meriwether

Troup

Pike Lamar Monroe

Baldwin Jones

Jefferson Washington

Burke

Harris

Upson Talbot

Bibb

Wilkinson

Crawford

Twiggs

Johnson

Jenkins Screven

Muscogee ChattahoocheeMarion

Taylor

Peach Houston

Macon

Bleckley

Laurens

Emanuel

Treutlen

Candler Bulloch Effingham

Schley
Stewart Webster Sumter
Quitman Randolph Terrell Lee

Dooly Crisp

Pulaski Wilcox

Dodge

Montgomery

Wheeler

Toombs

Evans

Tattnall

Telfair

Turner

Ben Hill

Jeff Davis Appling

Long

Bryan Liberty

Chatham

Clay Calhoun

Dougherty

Worth

Irwin Tift

Coffee

Early

Baker

Miller

Mitchell

Colquitt

Berrien Atkinson Cook

Lanier

Seminole Decatur

Grady

Thomas

Brooks

Lowndes

Clinch Echols

Bacon

Wayne

Pierce

Ware

Brantley

Charlton

McIntosh Glynn Camden

40

Section XI. Index of Counties

County
Appling Atkinson Bacon Baker Baldwin Banks Barrow Bartow Ben Hill Berrien Bibb Bleckley Brantley Brooks Bryan Bulloch Burke Butts Calhoun Camden Candler Carroll Catoosa Charlton Chatham Chattahoochee Chattooga Cherokee Clarke Clay Clayton Clinch Cobb Coffee Colquitt Columbia Cook Coweta Crawford Crisp Dade Dawson Decatur DeKalb

Page
105 107 109 110 112 115 118 120 126 128 In an MPO area 130 132 134 136 140 144 146 148 150 153 154 In an MPO area 158 In an MPO area In an MPO area 160 In an MPO area In an MPO area 162 In an MPO area 163 In an MPO area 164 168 172 173 In an MPO area 174 175 177 179 181 In an MPO area

County
Dodge Dooly Dougherty Douglas Early Echols Effingham Elbert Emanuel Evans Fannin Fayette Floyd Forsyth Franklin Fulton Gilmer Glascock Glynn Gordon Grady Greene Gwinnett Habersham Hall Hancock Haralson Harris Hart Heard Henry Houston Irwin Jackson Jasper Jeff Davis Jefferson Jenkins Johnson Jones Lamar

Page 184 186
In an MPO area In an MPO area
189 191 192 195 197 200 201 In an MPO area In an MPO area In an MPO area 203 In an MPO area 205 207 In an MPO area 208 210 212 In an MPO area 214 In an MPO area 217 219 221 224 225 In an MPO area In an MPO area 226 228 232 235 237 241 242 243 244
41

County
Lanier Laurens Lee Liberty Lincoln Long Lowndes Lumpkin Macon Madison Marion McDuffie McIntosh Meriwether Miller Mitchell Monroe Montgomery Morgan Murray Muscogee Newton Oconee Oglethorpe Paulding Peach Pickens Pierce Pike Polk Pulaski Putnam Quitman Rabun Randolph Richmond Rockdale Schley Screven Seminole Spalding Stephens Stewart Sumter Talbot

Page
245 247 250 In an MPO area 251 253 In an MPO area 254 257 260 261 263 266 267 269 270 272 275 276 279 In an MPO area 281 285 286 In an MPO area 287 289 292 294 296 297 299 302 303 305 In an MPO area In an MPO area 307 308 309 310 312 314 316 319

County
Taliaferro Tattnall Taylor Telfair Terrell Thomas Tift Toombs Towns Treutlen Troup Turner Twiggs Union Upson Walker Walton Ware Warren Washington Wayne Webster Wheeler White Whitfield Wilcox Wilkes Wilkinson Worth

Page 321 322 323 325 327 329 331 333 336 338 340 345 348 349 350 352 353 356 360 362 364 N/A 365 366
In an MPO area 368 369 371 372
42

STATE TRANSPORTATION IMPROVEMENT PROGRAM

All Counties

Project: 0000694 Type Work: Miscellaneous Improvements
Descp:OPERATE STATE AGENCY WIDE COMMERCIAL VEHICLE PERMIT SYSTEM Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Fund STP

Year 2015

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0005821 Type Work: Signing
Descp:SBR 15 CENTRAL RTE SBR 60 SBR70 NORTH CRESCENT BICYCLE SIGNS Length: 0.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 477,742 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $43,431 $434,311

State $0 $0

Other $0 $0

Total $43,431 $434,311

Project: 0006123 Type Work: Miscellaneous Improvements
Descp:LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2015 Length: 0.00

Phase ALL

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 19,000,000 $0 0

Fund STP

Year 2015

Federal $15,200,000

State $0

Other $3,800,000

Total $19,000,000

Project: 0006130 Type Work: Intersection Improvement Descp:LUMP SUM ROADWAY SAFETY FUNDS - 2015

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 70,000,000 $0 0

Phase ALL

Fund HSIP

Year 2015

Federal $63,000,000

State $7,000,000

Other $0

Total $70,000,000

Project: 0006137 Type Work: Bridges
Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING 2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,000,000 $0 0

Phase ALL

Fund STP

Year 2015

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

43

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0006165 Type Work: Lighting
Descp:LUMP SUM INTERCHANGE/ROADWAY LIGHTING 2015 Length: 0.00

Phase ALL

Fund NHPP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Year 2015

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0006167 Type Work: Lighting
Descp:LUMP SUM INTERCHANGE/ROADWAY LIGHTING 2016 Length: 0.00

Phase ALL

Fund NHPP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Year 2016

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0006172 Type Work: Bridges
Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,000,000 $0 0

Phase ALL

Fund NHPP

Year 2015

Federal $10,800,000

State $1,200,000

Other $0

Total $12,000,000

Project: 0006179 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA - 2015

Phase ALL

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 73,648,608 $0 0

Fund STP

Year 2015

Federal

State

$58,918,886 $14,729,722

Other $0

Total $73,648,608

Project: 0006186 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,500,000 $0 0

Phase ALL

Fund STP

Year 2015

Federal $10,000,000

State $2,500,000

Other $0

Total $12,500,000

44

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0006193 Type Work: Resurface & Maintenance
Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 43,000,000 $0 0

Phase ALL

Fund NHPP

Year 2015

Federal $34,400,000

State $8,600,000

Other $0

Total $43,000,000

Project: 0006200 Type Work: Railroad Crossing
Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,400,000 $0 0

Phase ALL

Fund HSIP

Year 2015

Federal $4,400,000

State $0

Other $0

Total $4,400,000

Project: 0006207 Type Work: Rights-Of-Way
Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Phase ALL

Fund STP

Year 2015

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0006214 Type Work: Railroad Crossing Descp:LUMP SUM RRX PROTECTION DEVICE - 2015

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,800,000 $0 0

Phase ALL

Fund HSIP

Year 2015

Federal $3,800,000

State $0

Other $0

Total $3,800,000

Project: 0006221 Type Work: Signals
Descp:LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,000,000 $0 0

Phase ALL

Fund STP

Year 2015

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

45

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0006228 Type Work: Special Studies
Descp:LUMP SUM TRAF&REVENUE/DESIGN-BUILD/SPECIAL Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Phase ALL

Fund STP

Year 2015

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0006235 Type Work: Water Pollution Mitig.
Descp:LUMP SUM WETLAND MITIGATION SITE PURCHASE/RESTORATION - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,200,000 $0 0

Phase ALL

Fund STP

Year 2015

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0006294 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN IMPROVEMENTS @ 10 SR LOCATIONS IN DISTRICT 6 Length: 0.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 530,573 $ 97,000 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $87,300
$390,215

State $9,700
$43,357

Other $0 $0

Total $97,000
$433,573

Project: 0006299 Type Work: TE-Landscape/Beautify
Descp:WILDFLOWER PROGRAM OVERHEAD ACCOUNT - PE ONLY Length: 0.00

Phase PE

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 918,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $734,400

State $183,600

Other $0

Total $918,000

Project: 0006367 Type Work: Miscellaneous Improvements
Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2015 Length: 0.00

Phase CST

Fund NHPP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 188,141,960 $0 0

Year

Federal

State

2015 $150,513,568 $37,628,392

Other

Total

$0 $188,141,960

46

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0006368 Type Work: Miscellaneous Improvements
Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2016 Length: 0.00

Phase CST

Fund NHPP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 188,141,960 $0 0

Year

Federal

State

2016 $150,513,568 $37,628,392

Other

Total

$0 $188,141,960

Project: 0006369 Type Work: Miscellaneous Improvements
Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2017 Length: 0.00

Phase CST

Fund NHPP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 188,141,960 $0 0

Year

Federal

State

2017 $150,513,568 $37,628,392

Other

Total

$0 $188,141,960

Project: 0006461 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 12 SR INTERSECTIONS IN DISTRICT 6 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 394,381 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $354,942

State $39,438

Other $0

Total $394,381

Project: 0006947 Type Work: Vegetation Removal
Descp:ENHANCED RECOVERY AREA - VEGETATION REMOVAL IN DISTRICT 6 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 537,792 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $484,012

State $53,779

Other $0

Total $537,792

Project: 0007498 Type Work: Operational Improvement Descp:LUMP SUM OPERATIONS FOR ANY AREA - 2015

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 13,450,000 $0 0

Phase ALL

Fund STP

Year 2015

Federal $10,760,000

State $2,690,000

Other $0

Total $13,450,000

47

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0007505 Type Work: Bicycle/Ped. Facility Descp:LUMP SUM RECREATIONAL TRAILS - 2015

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,250,000 $0 0

Phase ALL

Fund TAP

Year 2015

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0007507 Type Work: Bicycle/Ped. Facility Descp:LUMP SUM RECREATIONAL TRAILS - 2016

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,250,000 $0 0

Phase ALL

Fund TAP

Year 2016

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0007552 Type Work: Special Studies
Descp:SOUTHEASTERN ECONOMIC ALLIANCE HIGH SPEED RAIL DEVELOPMENT Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,249,750 $0 0

Phase PE

Fund HPP

Year 2015

Federal $1,799,800

State $449,950

Other $0

Total $2,249,750

Project: 0007700 Type Work: ITS
Descp:ITS OPERATIONS AND SUPPORT STATEWIDE 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,500,000 $0 0

Phase CST

Fund NHPP

Year 2016

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Project: 0007701 Type Work: ITS
Descp:ITS OPERATIONS AND SUPPORT STATEWIDE 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,500,000 $0 0

Phase CST

Fund NHPP

Year 2017

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

48

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0007702 Type Work: ITS
Descp:ITS OPERATIONS AND SUPPORT STATEWIDE 2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,500,000 $0 0

Phase CST

Fund NHPP

Year 2018

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Project: 0008326 Type Work: Miscellaneous Improvements
Descp:LUMP SUM SAFE ROUTES TO SCHOOL INFRASTRUCTURE - 2015 Length: 0.00

Phase ALL

Fund Safety

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,345,222 $0 0

Year 2015

Federal $1,345,222

State $0

Other $0

Total $1,345,222

Project: 0008333 Type Work: Miscellaneous Improvements
Descp:LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - 2015 Length: 0.00

Phase ALL

Fund Safety

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 810,000 $0 0

Year 2015

Federal $810,000

State $0

Other $0

Total $810,000

Project: 0008334 Type Work: Miscellaneous Improvements
Descp:LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - 2016 Length: 0.00

Phase ALL

Fund Safety

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 810,270 $0 0

Year 2016

Federal $810,270

State $0

Other $0

Total $810,270

Project: 0008639 Type Work: Intersection Improvement Descp:LUMP SUM HIGH RISK RURAL ROADS - 2016

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,200,000 $0 0

Phase ALL

Fund Safety

Year 2016

Federal $2,880,000

State $320,000

Other $0

Total $3,200,000

49

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009224 Type Work: Miscellaneous Improvements
Descp:LUMP SUM SAFE ROUTES TO SCHOOL ANY PROJECTS - 2015 Length: 0.00

Phase ALL

Fund Safety

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 546,170 $0 0

Year 2015

Federal $546,170

State $0

Other $0

Total $546,170

Project: 0009555 Type Work: Preliminary Engineering
Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 350,000 $0 0

Phase PE

Fund STP

Year 2015

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0009574 Type Work: Preliminary Engineering
Descp:STATEWIDE BRIDGE INSPECTION - FY 2016 - PE ONLY Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,500,000 $0 0

Phase PE

Fund STP

Year 2016

Federal $6,800,000

State $1,700,000

Other $0

Total $8,500,000

Project: 0009575 Type Work: Preliminary Engineering
Descp:STATEWIDE BRIDGE INSPECTION - FY 2017 - PE ONLY Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,500,000 $0 0

Phase PE

Fund STP

Year 2017

Federal $6,800,000

State $1,700,000

Other $0

Total $8,500,000

Project: 0009577 Type Work: Preliminary Engineering
Descp:ENVIRONMENTAL ANALYSIS ON FED-AID PROJ BY CONSULTANT-FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,500,000 $0 0

Phase Fund PE NHPPX

Year 2015

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

50

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009578 Type Work: Preliminary Engineering
Descp:ENVIRONMENTAL ANALYSIS ON FED-AID PROJ BY CONSULTANT-FY 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,500,000 $0 0

Phase Fund PE NHPPX

Year 2017

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

Project: 0009581 Type Work: Miscellaneous Improvements
Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - 2015 Length: 0.00

Phase CST CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 28,785,000 $ 11,000,000 0

Fund STP STP

Year 2015 2015

Federal $14,228,000
$8,800,000

State $3,557,000 $2,200,000

Other $0 $0

Total $17,785,000 $11,000,000

Project: 0009582 Type Work: Miscellaneous Improvements
Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - 2016 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 29,072,000 $0 0

Fund STP

Year 2016

Federal $23,257,600

State $5,814,400

Other $0

Total $29,072,000

Project: 0009583 Type Work: Miscellaneous Improvements
Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - 2017 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 29,657,215 $0 0

Fund STP

Year 2017

Federal $23,725,772

State $5,931,443

Other $0

Total $29,657,215

Project: 0009587 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2015 - PE ONLY

Phase PE

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Fund STP

Year 2015

Federal $1,000,000

State $0

Other $0

Total $1,000,000

51

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009588 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2016 - PE ONLY

Phase PE

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Fund STP

Year 2016

Federal $1,000,000

State $0

Other $0

Total $1,000,000

Project: 0009589 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2017 - PE ONLY

Phase PE

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Fund STP

Year 2017

Federal $1,000,000

State $0

Other $0

Total $1,000,000

Project: 0009590 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2015 Length: 0.00

Phase PE

Fund CMAQ

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,200,000 $0 0

Year 2015

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0009591 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2016 Length: 0.00

Phase PE

Fund CMAQ

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,200,000 $0 0

Year 2016

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0009592 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2017 Length: 0.00

Phase PE

Fund CMAQ

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,200,000 $0 0

Year 2017

Federal $960,000

State $240,000

Other $0

Total $1,200,000

52

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009594 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2015 Length: 0.00

Phase PE PE

Fund CMAQ CMAQ

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,000,000 $0 0

Year 2015 2015

Federal $4,944,000
$820,000

State $1,236,000
$0

Other $0 $0

Total $6,180,000
$820,000

Project: 0009595 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2016 Length: 0.00

Phase PE PE

Fund CMAQ CMAQ

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,000,000 $0 0

Year 2016 2016

Federal $4,944,000
$820,000

State $1,236,000
$0

Other $0 $0

Total $6,180,000
$820,000

Project: 0009596 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2017 Length: 0.00

Phase PE PE

Fund CMAQ CMAQ

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,000,000 $0 0

Year 2017 2017

Federal $4,944,000
$820,000

State $1,236,000
$0

Other $0 $0

Total $6,180,000
$820,000

Project: 0009717 Type Work: Miscellaneous Improvements
Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2018 Length: 0.00

Phase CST

Fund NHPP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 185,246,410 $0 0

Year

Federal

State

2018 $148,197,128 $37,049,282

Other

Total

$0 $185,246,410

Project: 0009738 Type Work: Miscellaneous Improvements
Descp:LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2016 Length: 0.00

Phase ALL

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 19,000,000 $0 0

Fund STP

Year 2016

Federal $15,200,000

State $0

Other $3,800,000

Total $19,000,000

53

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009739 Type Work: Miscellaneous Improvements
Descp:LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2017 Length: 0.00

Phase ALL

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 19,000,000 $0 0

Fund STP

Year 2017

Federal $15,200,000

State $0

Other $3,800,000

Total $19,000,000

Project: 0009740 Type Work: Miscellaneous Improvements
Descp:LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2018 Length: 0.00

Phase ALL

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 19,000,000 $0 0

Fund STP

Year 2018

Federal $15,200,000

State $0

Other $3,800,000

Total $19,000,000

Project: 0009742 Type Work: Intersection Improvement Descp:LUMP SUM ROADWAY SAFETY FUNDS - 2016

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 74,850,000 $0 0

Phase ALL

Fund HSIP

Year 2016

Federal $67,365,000

State $7,485,000

Other $0

Total $74,850,000

Project: 0009743 Type Work: Intersection Improvement Descp:LUMP SUM ROADWAY SAFETY FUNDS - 2017

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 75,000,000 $0 0

Phase ALL

Fund HSIP

Year 2017

Federal $67,500,000

State $7,500,000

Other $0

Total $75,000,000

Project: 0009744 Type Work: Intersection Improvement Descp:LUMP SUM ROADWAY SAFETY FUNDS - 2018

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 80,000,000 $0 0

Phase ALL

Fund HSIP

Year 2018

Federal $72,000,000

State $8,000,000

Other $0

Total $80,000,000

54

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009746 Type Work: Bridges
Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,000,000 $0 0

Phase ALL

Fund STP

Year 2016

Federal $4,800,000

State $1,200,000

Other $0

Total $6,000,000

Project: 0009747 Type Work: Bridges
Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,000,000 $0 0

Phase ALL

Fund STP

Year 2017

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Project: 0009748 Type Work: Bridges
Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING 2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,000,000 $0 0

Phase ALL

Fund STP

Year 2018

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Project: 0009755 Type Work: Lighting
Descp:LUMP SUM INTERCHANGE/ROADWAY LIGHTING 2018 Length: 0.00

Phase ALL

Fund NHPP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Year 2018

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0009758 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA - 2016

Phase ALL

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 64,739,730 $0 0

Fund STP

Year 2016

Federal

State

$51,791,784 $12,947,946

Other $0

Total $64,739,730

55

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009759 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA - 2017

Phase ALL

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 56,300,000 $0 0

Fund STP

Year 2017

Federal

State

$45,040,000 $11,260,000

Other $0

Total $56,300,000

Project: 0009760 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA - 2018

Phase ALL

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 62,100,000 $0 0

Fund STP

Year 2018

Federal

State

$49,680,000 $12,420,000

Other $0

Total $62,100,000

Project: 0009762 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,000,000 $0 0

Phase ALL

Fund STP

Year 2016

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: 0009763 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,000,000 $0 0

Phase ALL

Fund STP

Year 2017

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: 0009764 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,000,000 $0 0

Phase ALL

Fund STP

Year 2018

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

56

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009766 Type Work: Resurface & Maintenance
Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 34,000,000 $0 0

Phase ALL

Fund NHPP

Year 2016

Federal $27,200,000

State $6,800,000

Other $0

Total $34,000,000

Project: 0009767 Type Work: Resurface & Maintenance
Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 32,000,000 $0 0

Phase ALL

Fund NHPP

Year 2017

Federal $25,600,000

State $6,400,000

Other $0

Total $32,000,000

Project: 0009768 Type Work: Resurface & Maintenance
Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 31,300,000 $0 0

Phase ALL

Fund NHPP

Year 2018

Federal $25,040,000

State $6,260,000

Other $0

Total $31,300,000

Project: 0009770 Type Work: Railroad Crossing
Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,400,000 $0 0

Phase ALL

Fund HSIP

Year 2016

Federal $4,400,000

State $0

Other $0

Total $4,400,000

Project: 0009771 Type Work: Railroad Crossing
Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,400,000 $0 0

Phase ALL

Fund HSIP

Year 2017

Federal $4,400,000

State $0

Other $0

Total $4,400,000

57

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009772 Type Work: Railroad Crossing
Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,400,000 $0 0

Phase ALL

Fund HSIP

Year 2018

Federal $4,400,000

State $0

Other $0

Total $4,400,000

Project: 0009774 Type Work: Rights-Of-Way
Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Phase ALL

Fund STP

Year 2016

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0009775 Type Work: Rights-Of-Way
Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Phase ALL

Fund STP

Year 2017

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0009776 Type Work: Rights-Of-Way
Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Phase ALL

Fund STP

Year 2018

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0009778 Type Work: Railroad Crossing Descp:LUMP SUM RRX PROTECTION DEVICE - 2016

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,800,000 $0 0

Phase ALL

Fund HSIP

Year 2016

Federal $3,800,000

State $0

Other $0

Total $3,800,000

58

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009779 Type Work: Railroad Crossing Descp:LUMP SUM RRX PROTECTION DEVICE - 2017

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,800,000 $0 0

Phase ALL

Fund HSIP

Year 2017

Federal $3,800,000

State $0

Other $0

Total $3,800,000

Project: 0009780 Type Work: Railroad Crossing Descp:LUMP SUM RRX PROTECTION DEVICE - 2018

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,800,000 $0 0

Phase ALL

Fund HSIP

Year 2018

Federal $3,800,000

State $0

Other $0

Total $3,800,000

Project: 0009782 Type Work: Signals
Descp:LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,000,000 $0 0

Phase ALL

Fund STP

Year 2016

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: 0009783 Type Work: Signals
Descp:LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 13,000,000 $0 0

Phase ALL

Fund STP

Year 2017

Federal $10,400,000

State $2,600,000

Other $0

Total $13,000,000

Project: 0009784 Type Work: Signals
Descp:LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 13,000,000 $0 0

Phase ALL

Fund STP

Year 2018

Federal $10,400,000

State $2,600,000

Other $0

Total $13,000,000

59

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009786 Type Work: Special Studies
Descp:LUMP SUM TRAF&REVENUE/DESIGN-BUILD/SPECIAL Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 750,000 $0 0

Phase ALL

Fund STP

Year 2016

Federal $600,000

State $150,000

Other $0

Total $750,000

Project: 0009787 Type Work: Special Studies
Descp:LUMP SUM TRAF&REVENUE/DESIGN-BUILD/SPECIAL Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Phase ALL

Fund STP

Year 2017

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0009790 Type Work: Operational Improvement Descp:LUMP SUM OPERATIONS FOR ANY AREA - 2016

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 13,000,000 $0 0

Phase ALL

Fund STP

Year 2016

Federal $10,400,000

State $2,600,000

Other $0

Total $13,000,000

Project: 0009791 Type Work: Operational Improvement Descp:LUMP SUM OPERATIONS FOR ANY AREA - 2017

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,000,000 $0 0

Phase ALL

Fund STP

Year 2017

Federal $9,600,000

State $2,400,000

Other $0

Total $12,000,000

Project: 0009792 Type Work: Operational Improvement Descp:LUMP SUM OPERATIONS FOR ANY AREA - 2018

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,000,000 $0 0

Phase ALL

Fund STP

Year 2018

Federal $9,600,000

State $2,400,000

Other $0

Total $12,000,000

60

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009794 Type Work: Bicycle/Ped. Facility Descp:LUMP SUM RECREATIONAL TRAILS - 2017

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,250,000 $0 0

Phase ALL

Fund TAP

Year 2017

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0009795 Type Work: Bicycle/Ped. Facility Descp:LUMP SUM RECREATIONAL TRAILS - 2018

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,250,000 $0 0

Phase ALL

Fund TAP

Year 2018

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0009993 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 1 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 424,483 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $382,035

State $42,448

Other $0

Project: 0009994 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 2 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 424,483 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $382,035

State $42,448

Other $0

Project: 0009995 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 3 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 424,483 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $382,035

State $42,448

Other $0

Total $424,483
Total $424,483
Total $424,483

61

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009996 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 4 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 424,483 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $382,035

State $42,448

Other $0

Project: 0009998 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 6 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 424,483 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $382,035

State $42,448

Other $0

Project: 0010151 Type Work: Preliminary Engineering
Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2015 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 350,000 $0 0

Fund STP

Year 2015

Federal $280,000

State $70,000

Other $0

Total $424,483
Total $424,483
Total $350,000

Project: 0010152 Type Work: Preliminary Engineering
Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2016 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 350,000 $0 0

Fund STP

Year 2016

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0010153 Type Work: Preliminary Engineering
Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2017 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 350,000 $0 0

Fund STP

Year 2017

Federal $280,000

State $70,000

Other $0

Total $350,000

62

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0010154 Type Work: Preliminary Engineering
Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2018 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 350,000 $0 0

Fund STP

Year 2018

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0010169 Type Work: Preliminary Engineering
Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS FY 2015 Length: 0.00

Phase PE

Fund Enhance

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 40,000 $0 0

Year 2015

Federal $32,000

State $8,000

Other $0

Total $40,000

Project: 0010170 Type Work: Preliminary Engineering
Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS FY 2016 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 100,000 $0 0

Fund STP

Year 2016

Federal $80,000

State $20,000

Other $0

Total $100,000

Project: 0010171 Type Work: Preliminary Engineering
Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS FY 2017 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 100,000 $0 0

Fund STP

Year 2017

Federal $80,000

State $20,000

Other $0

Total $100,000

Project: 0010172 Type Work: Preliminary Engineering
Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS FY 2018 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 100,000 $0 0

Fund STP

Year 2018

Federal $80,000

State $20,000

Other $0

Total $100,000

63

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0010300 Type Work: Bridges
Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 10,000,000 $0 0

Phase ALL

Fund NHPP

Year 2016

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Project: 0010301 Type Work: Bridges
Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,000,000 $0 0

Phase ALL

Fund NHPP

Year 2017

Federal $10,800,000

State $1,200,000

Other $0

Total $12,000,000

Project: 0010302 Type Work: Bridges
Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,000,000 $0 0

Phase ALL

Fund NHPP

Year 2018

Federal $10,800,000

State $1,200,000

Other $0

Total $12,000,000

Project: 0010312 Type Work: Preliminary Engineering Descp:SR 400 - HERO EXPANSION

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 660,000 $0 0

Phase PE PE PE PE PE PE

Fund State State State State State State

Year 2014 2015 2016 2017 2018 After 2018

Federal $0 $0 $0 $0 $0 $0

State $0 $0 $0 $0 $0 $0

Other $110,000 $110,000 $110,000 $110,000 $110,000 $110,000

Total $110,000 $110,000 $110,000 $110,000 $110,000 $110,000

Project: 0010491 Type Work: Signals
Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2015 Length: 0.00

Phase CST

Fund STP

Year LUMP

Federal $3,200,000

State $800,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,000,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Other $0

Total $4,000,000

64

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0010566 Type Work: Preliminary Engineering Descp:STATEWIDE SIGNAL TIMING & DESIGN - 2015
Length: 0.00

Phase PE

Fund STP

Year LUMP

Federal $800,000

State $200,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Other $0

Total $1,000,000

Project: 0010833 Type Work: Preliminary Engineering
Descp:ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,200,000 $0 0

Phase PE

Fund STP

Year 2015

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0010834 Type Work: Preliminary Engineering
Descp:ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,200,000 $0 0

Phase PE

Fund STP

Year 2016

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0010908 Type Work: Preliminary Engineering Descp:MS4 PERMIT COMPLIANCE - FY 2015

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,884,715 $ 2,884,715 0

Phase PE

Fund STP

Year 2015

Federal $2,307,772

State $576,943

Other $0

Total $2,884,715

Project: 0010909 Type Work: Preliminary Engineering Descp:MS4 PERMIT COMPLIANCE - FY 2016

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,048,900 $0 0

Phase PE

Fund STP

Year 2016

Federal $4,039,120

State $1,009,780

Other $0

Total $5,048,900

65

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0010919 Type Work: Preliminary Engineering
Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 350,000 $0 0

Phase PE

Fund STP

Year 2016

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0010920 Type Work: Preliminary Engineering
Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 350,000 $0 0

Phase PE

Fund STP

Year 2017

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0011652 Type Work: Signing
Descp:STATE HIGHWAY-RAIL CROSSING SIGNING & MARKING ENG SERVICES Length: 0.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,600,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $100,000
$1,500,000

State $0 $0

Other $0 $0

Total $100,000 $1,500,000

Project: 0012684 Type Work: Weigh Scales Descp:WEIGH-IN-MOTION SCALES - FY 2015

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,000,000 $0 0

Phase PE CST

Fund NHPP NHPP

Year 2015 2015

Federal $450,000
$4,050,000

State $50,000 $450,000

Other $0 $0

Total $500,000 $4,500,000

Project: 0012685 Type Work: Weigh Scales Descp:WEIGH-IN-MOTION SCALES - FY 2016

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,500,000 $0 0

Phase PE CST

Fund NHPP NHPP

Year 2016 2016

Federal $450,000
$4,500,000

State $50,000 $500,000

Other $0 $0

Total $500,000 $5,000,000

66

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012686 Type Work: Weigh Scales Descp:WEIGH-IN-MOTION SCALES - FY 2017

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,000,000 $0 0

Phase PE CST

Fund NHPP NHPP

Year 2017 2017

Federal $450,000
$4,050,000

State $50,000 $450,000

Other $0 $0

Total $500,000 $4,500,000

Project: 0012687 Type Work: Weigh Scales Descp:WEIGH-IN-MOTION SCALES - FY 2018

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,000,000 $0 0

Phase PE CST

Fund NHPP NHPP

Year 2018 2018

Federal $450,000
$4,050,000

State $50,000 $450,000

Other $0 $0

Total $500,000 $4,500,000

Project: 0012713 Type Work: Preliminary Engineering
Descp:DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2014 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,000 $0 0

Phase Fund

Year

PE Other Funds 2015

Federal $300,000

State $0

Other $0

Total $300,000

Project: 0012714 Type Work: Preliminary Engineering
Descp:DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2015 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,000 $0 0

Phase Fund

Year

PE Other Funds 2016

Federal $300,000

State $0

Other $0

Total $300,000

Project: 0012715 Type Work: Preliminary Engineering
Descp:DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,000 $0 0

Phase Fund

Year

PE Other Funds 2017

Federal $300,000

State $0

Other $0

Total $300,000

67

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012716 Type Work: Preliminary Engineering
Descp:DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,000 $0 0

Phase Fund

Year

PE Other Funds 2018

Federal $300,000

State $0

Other $0

Total $300,000

Project: 0012718 Type Work: Preliminary Engineering
Descp:ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2014 Length: 0.00

Phase Fund PE Other Funds

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 200,000 $0 0

Federal $200,000

State $0

Other $0

Total $200,000

Project: 0012719 Type Work: Preliminary Engineering
Descp:ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2015 Length: 0.00

Phase Fund PE Other Funds

Year 2016

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 200,000 $0 0

Federal $200,000

State $0

Other $0

Total $200,000

Project: 0012720 Type Work: Preliminary Engineering
Descp:ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2016 Length: 0.00

Phase Fund PE Other Funds

Year 2017

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 200,000 $0 0

Federal $200,000

State $0

Other $0

Total $200,000

Project: 0012721 Type Work: Preliminary Engineering
Descp:ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2017 Length: 0.00

Phase Fund PE Other Funds

Year 2018

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 200,000 $0 0

Federal $200,000

State $0

Other $0

Total $200,000

68

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012761 Type Work: Preliminary Engineering Descp:LOW IMPACT BRIDGE OVERSIGHT - FY 2015

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 600,000 $0 0

Phase PE

Fund STP

Year 2015

Federal $480,000

State $120,000

Other $0

Total $600,000

Project: 0012762 Type Work: Preliminary Engineering Descp:LOW IMPACT BRIDGE OVERSIGHT - FY 2016

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 600,000 $0 0

Phase PE

Fund STP

Year 2016

Federal $480,000

State $120,000

Other $0

Total $600,000

Project: 0012763 Type Work: Preliminary Engineering Descp:LOW IMPACT BRIDGE OVERSIGHT - FY 2017

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 600,000 $0 0

Phase PE

Fund STP

Year 2017

Federal $480,000

State $120,000

Other $0

Total $600,000

Project: 0012765 Type Work: Bridge Rehab Descp:LUMP SUM LOW IMPACT BRIDGES - 2015

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,000,000 $0 0

Phase ALL

Fund STP

Year 2015

Federal $4,000,000

State $1,000,000

Other $0

Total $5,000,000

Project: 0012766 Type Work: Bridge Rehab Descp:LUMP SUM LOW IMPACT BRIDGES - 2016

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,500,000 $0 0

Phase ALL

Fund STP

Year 2016

Federal $2,800,000

State $700,000

Other $0

Total $3,500,000

69

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012767 Type Work: Bridge Rehab Descp:LUMP SUM LOW IMPACT BRIDGES - 2017

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,000,000 $0 0

Phase ALL

Fund STP

Year 2017

Federal $4,000,000

State $1,000,000

Other $0

Total $5,000,000

Project: 0012770 Type Work: Miscellaneous Improvements
Descp:SAFE ROUTES TO SCHOOLS RESOURCE CENTER - PHASE VII Length: 0.00

Phase PE

Fund Safety

Year LUMP

Federal $160,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 160,000 $0 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE FOR FY 2015 - FY 2018

State $0

Other $0

Project: 0012771 Type Work: Miscellaneous Improvements
Descp:SAFE ROUTES TO SCHOOLS RESOURCE CENTER - PHASE VIII Length: 0.00

Phase PE

Fund Safety

Year LUMP

Federal $160,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 160,000 $0 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE FOR FY 2015 - FY 2018

State $0

Other $0

Project: 0012807 Type Work: Preliminary Engineering

Descp:GEORGIA HISTORIC BRIDGE MGT PLANS &

SURVEY (GHBS) - FY 2015

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,000 $0 0

Phase PE

Fund STP

Year 2015

Federal $240,000

State $60,000

Other $0

Total $160,000
Total $160,000
Total $300,000

Project: 0012810 Type Work: Preliminary Engineering
Descp:AASHTO COMMITTEES & SPONSORED EVENTS FY 2015 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 115,000 $0 0

Fund STP

Year 2015

Federal $115,000

State $0

Other $0

Total $115,000

70

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012811 Type Work: Preliminary Engineering
Descp:AASHTO COMMITTEES & SPONSORED EVENTS FY 2016 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 115,000 $0 0

Fund STP

Year 2016

Federal $115,000

State $0

Other $0

Total $115,000

Project: 0012812 Type Work: Preliminary Engineering
Descp:AASHTO COMMITTEES & SPONSORED EVENTS FY 2017 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 115,000 $0 0

Fund STP

Year 2017

Federal $115,000

State $0

Other $0

Total $115,000

Project: 0012852 Type Work: Preliminary Engineering Descp:SPECIAL DRAINAGE STUDIES - FY 2015

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Phase PE

Fund STP

Year 2015

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0012853 Type Work: Preliminary Engineering Descp:SPECIAL DRAINAGE STUDIES - FY 2016

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Phase PE

Fund STP

Year 2016

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0012945 Type Work: Preliminary Engineering
Descp:STATEWIDE BRIDGE INSPECTION - FY 2018 - PE ONLY Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,500,000 $0 0

Phase PE

Fund STP

Year 2018

Federal $6,800,000

State $1,700,000

Other $0

Total $8,500,000

71

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012950 Type Work: Preliminary Engineering
Descp:ENVIRONMENTAL ANALYSIS ON FED-AID PROJ BY CONSULTANT-FY 2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,500,000 $0 0

Phase Fund PE NHPPX

Year 2018

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

Project: 0012955 Type Work: Miscellaneous Improvements
Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - 2018 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 30,000,000 $0 0

Fund STP

Year 2018

Federal $24,000,000

State $6,000,000

Other $0

Total $30,000,000

Project: 0012960 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2018 - PE ONLY

Phase PE

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Fund STP

Year 2018

Federal $1,000,000

State $0

Other $0

Total $1,000,000

Project: 0012964 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2022 - PE ONLY

Phase PE

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Fund STP

Year 2017

Federal $1,000,000

State $0

Other $0

Total $1,000,000

Project: 0012965 Type Work: Preliminary Engineering
Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 350,000 $0 0

Phase PE

Fund STP

Year 2018

Federal $280,000

State $70,000

Other $0

Total $350,000

72

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012970 Type Work: Preliminary Engineering Descp:LOW IMPACT BRIDGE OVERSIGHT - FY 2018

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 600,000 $0 0

Phase PE

Fund STP

Year 2018

Federal $480,000

State $120,000

Other $0

Total $600,000

Project: 0012975 Type Work: Preliminary Engineering
Descp:AASHTO COMMITTEES & SPONSORED EVENTS FY 2018 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 115,000 $0 0

Fund STP

Year 2018

Federal $115,000

State $0

Other $0

Total $115,000

Project: 0012982 Type Work: Preliminary Engineering
Descp:ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,500,000 $0 0

Phase PE

Fund STP

Year 2017

Federal $1,200,000

State $300,000

Other $0

Total $1,500,000

Project: 0012983 Type Work: Preliminary Engineering
Descp:ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2018 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,500,000 $0 0

Phase PE

Fund STP

Year 2018

Federal $1,200,000

State $300,000

Other $0

Total $1,500,000

Project: 0012988 Type Work: Preliminary Engineering Descp:MS4 PERMIT COMPLIANCE - FY 2017

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,048,900 $0 0

Phase PE

Fund STP

Year 2017

Federal $4,039,120

State $1,009,780

Other $0

Total $5,048,900

73

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012989 Type Work: Preliminary Engineering Descp:MS4 PERMIT COMPLIANCE - FY 2018

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,048,900 $0 0

Phase PE

Fund STP

Year 2018

Federal $4,039,120

State $1,009,780

Other $0

Total $5,048,900

Project: 0012994 Type Work: Preliminary Engineering Descp:SPECIAL DRAINAGE STUDIES - FY 2017

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Phase PE

Fund STP

Year 2017

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0012995 Type Work: Preliminary Engineering Descp:SPECIAL DRAINAGE STUDIES - FY 2018

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Phase PE

Fund STP

Year 2018

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0013057 Type Work: Preliminary Engineering
Descp:ENVIRONMENTAL ANALYSIS ON FED-AID PROJ BY CONSULTANT-FY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,500,000 $0 0

Phase Fund PE NHPPX

Year 2016

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

Project: 0013059 Type Work: Preliminary Engineering
Descp:PE FOR PROJ REVIEW/COST ESTIMATING CONSULTANT SERVICES-2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,000,000 $0 0

Phase PE

Fund STP

Year 2017

Federal $1,600,000

State $400,000

Other $0

Total $2,000,000

74

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013070 Type Work: Preliminary Engineering Descp:LIGHTING DESIGN SERVICES - FY 2015

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 150,000 $0 0

Phase PE

Fund STP

Year 2015

Federal $120,000

State $30,000

Other $0

Total $150,000

Project: 0013071 Type Work: Preliminary Engineering Descp:LIGHTING DESIGN SERVICES - FY 2016

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 150,000 $0 0

Phase PE

Fund STP

Year 2016

Federal $120,000

State $30,000

Other $0

Total $150,000

Project: 0013072 Type Work: Preliminary Engineering Descp:LIGHTING DESIGN SERVICES - FY 2017

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 150,000 $0 0

Phase PE

Fund STP

Year 2017

Federal $120,000

State $30,000

Other $0

Total $150,000

Project: 0013073 Type Work: Preliminary Engineering Descp:LIGHTING DESIGN SERVICES - FY 2018

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 150,000 $0 0

Phase PE

Fund STP

Year 2018

Federal $120,000

State $30,000

Other $0

Total $150,000

Project: 0013080 Type Work: Signals

Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE &

UPGRADES - FY 2016

Lanes: Exist. Prop.

Length: 0.00

Phase CST

Fund STP

Year LUMP

Federal $3,200,000

State $800,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,000,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Other $0

Total $4,000,000

75

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013081 Type Work: Signals
Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2017 Length: 0.00

Phase CST

Fund STP

Year LUMP

Federal $3,200,000

State $800,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,000,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Other $0

Total $4,000,000

Project: 0013082 Type Work: Signals

Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE &

UPGRADES - FY 2018

Lanes: Exist. Prop.

Length: 0.00

Phase CST

Fund STP

Year LUMP

Federal $3,200,000

State $800,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,000,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Other $0

Total $4,000,000

Project: 0013083 Type Work: Signals

Descp:STATEWIDE SIGNAL TIMING & DESIGN - FY 2016

Lanes: Exist. Prop.

Length: 0.00

Phase PE

Fund STP

Year LUMP

Federal $800,000

State $200,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Other $0

Total $1,000,000

Project: 0013084 Type Work: Signals

Descp:STATEWIDE SIGNAL TIMING & DESIGN - FY 2017

Lanes: Exist. Prop.

Length: 0.00

Phase PE

Fund STP

Year LUMP

Federal $800,000

State $200,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Other $0

Total $1,000,000

Project: 0013085 Type Work: Signals

Descp:STATEWIDE SIGNAL TIMING & DESIGN - FY 2018

Lanes: Exist. Prop.

Length: 0.00

Phase PE

Fund STP

Year LUMP

Federal $800,000

State $200,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Other $0

Total $1,000,000

76

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013087 Type Work: Preliminary Engineering

Descp:SAFETY MEDIA ACTIVITIES

Lanes: Exist. Prop.

Length: 0.00

Phase PE

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 100,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $90,000

State $10,000

Other $0

Total $100,000

Project: 0013105 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2018 Length: 0.00

Phase PE PE

Fund CMAQ CMAQ

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,000,000 $0 0

Year 2018 2018

Federal $4,944,000
$820,000

State $1,236,000
$0

Other $0 $0

Total $6,180,000
$820,000

Project: 0013152 Type Work: Special Studies

Descp:ROUNDABOUT FEASIBLITY STUDIES - PHASE I

Lanes: Exist. Prop.

Length: 0.00

Phase PE

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 629,970 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $566,973

State $62,997

Other $0

Total $629,970

Project: 0013168 Type Work: Preliminary Engineering

Descp:TE PROJECT MANAGEMENT - FY 2015

Lanes: Exist. Prop.

Length: 0.00

Phase PE

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,000,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $1,600,000

State $400,000

Other $0

Total $2,000,000

Project: 0013171 Type Work: Pedestrian Crossings

Descp:PEDESTRIAN UPGRADES @ 35 LOCS IN

DISTRICT 1

Lanes: Exist. Prop.

Length: 0.00

Phase PE
ROW CST

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,375,000 $ 1,050,000 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year 2014 LUMP LUMP

Federal $945,000 $472,500
$1,620,000

State $105,000
$52,500 $180,000

Other $0 $0 $0

Total $1,050,000
$525,000 $1,800,000

77

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013172 Type Work: Pedestrian Crossings

Descp:PEDESTRIAN UPGRADES @ 16 LOCS IN

DISTRICT 4

Lanes: Exist. Prop.

Length: 0.00

Phase PE
ROW CST

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,410,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP LUMP

Federal $270,000 $216,000 $783,000

State $30,000 $24,000 $87,000

Other $0 $0 $0

Total $300,000 $240,000 $870,000

Project: 0013173 Type Work: Pedestrian Crossings

Descp:PEDESTRIAN UPGRADES @ 59 LOCS IN

DISTRICT 6

Lanes: Exist. Prop.

Length: 0.00

Phase PE
ROW CST

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,605,000 $ 1,770,000 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year 2014 LUMP LUMP

Federal $1,593,000
$796,500 $2,655,000

State $177,000
$88,500 $295,000

Other $0 $0 $0

Total $1,770,000
$885,000 $2,950,000

Project: 0013181 Type Work: Preliminary Engineering Descp:GDOT IT ENTERPRISE SUPPORT - FY 2016

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 14,390,600 $0 0

Phase PE

Fund STP

Year 2016

Federal $11,512,480

State $2,878,120

Other $0

Total $14,390,600

Project: 0013182 Type Work: Preliminary Engineering Descp:GDOT IT ENTERPRISE SUPPORT - FY 2017

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 14,052,500 $0 0

Phase PE

Fund STP

Year 2017

Federal $11,242,000

State $2,810,500

Other $0

Total $14,052,500

Project: 0013183 Type Work: Preliminary Engineering Descp:GDOT IT ENTERPRISE SUPPORT - FY 2018

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 13,922,000 $0 0

Phase PE

Fund STP

Year 2018

Federal $11,137,600

State $2,784,400

Other $0

Total $13,922,000

78

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013188 Type Work: Bridge Rehab Descp:LUMP SUM LOW IMPACT BRIDGES - 2018

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,000,000 $0 0

Phase ALL

Fund STP

Year 2018

Federal $4,000,000

State $1,000,000

Other $0

Total $5,000,000

Project: 0013190 Type Work: Miscellaneous Improvements
Descp:TOWING & RECOVERY INCENTIVE PROGRAM FY 2018 Length: 0.00

Phase CST

Fund CMAQ

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Year 2018

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0013227 Type Work: ITS

Descp:ITS CAMERAS & ROAD WEATHER INFORMATION

SYSTEMS @ VAR LOCS

Lanes: Exist. Prop.

Length: 0.00

Phase PE CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,500,000 $0 0

Fund Bond Bond

Year 2015 2015

Federal $0 $0

State $150,000 $5,350,000

Other $0 $0

Total $150,000 $5,350,000

Project: 0013233 Type Work: Water Pollution Mitig.
Descp:LUMP SUM WETLAND MITIGATION SITE PURCHASE/RESTORATION - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,200,000 $0 0

Phase ALL

Fund STP

Year 2016

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0013234 Type Work: Water Pollution Mitig.
Descp:LUMP SUM WETLAND MITIGATION SITE PURCHASE/RESTORATION - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,200,000 $0 0

Phase ALL

Fund STP

Year 2017

Federal $960,000

State $240,000

Other $0

Total $1,200,000

79

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013247 Type Work: RRX Warning Device Descp:HAZARD INDEX STUDIES - FY 2015
Length: 0.00

Phase PE

Fund HSIP

Year LUMP

Federal $300,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,000 $0 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018

State $0

Other $0

Total $300,000

Project: 0013265 Type Work: Miscellaneous Improvements

Descp:STATEWIDE SUE CONSULTANT SERVICES - FY

2015

Lanes: Exist. Prop.

Length: 0.00

Phase UTL

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,500,000 $0 0

Fund State

Year 2015

Federal $0

State $0

Other $4,500,000

Total $4,500,000

Project: 821055- Type Work: Bridges
Descp:OFF SYSTEM PILE ENCASEMENT PROJECT TO REPAIR 4 BRIDGES Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 59,755 $0 0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Federal $47,804

State $11,951

Other $0

Project: M001854 Type Work: Bridges
Descp:PILE ENCASEMENT @ 17 SR LOCATIONS IN DIST 6 Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 223,482 $0 0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Federal $178,786

State $44,696

Other $0

Project: M001911 Type Work: Preliminary Engineering Descp:LICENSE AND SUPPORT AGREEMENT HMMS
Length: 0.00

Phase PE

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 179,264 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $143,411

State $35,853

Other $0

Total $59,755
Total $223,482
Total $179,264

80

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M003378 Type Work: Miscellaneous Improvements
Descp:FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2016 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 18,000,000 $0 0

Fund STP

Year 2016

Federal $14,400,000

State $3,600,000

Other $0

Total $18,000,000

Project: M003379 Type Work: Miscellaneous Improvements
Descp:FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2017 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,000,000 $0 0

Fund STP

Year 2017

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: M003380 Type Work: Miscellaneous Improvements
Descp:FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2018 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,000,000 $0 0

Fund STP

Year 2018

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: M003820 Type Work: Weigh Station
Descp:WEIGH STATION UPGRADES @ 6 LOCATIONS PE ONLY - PHASE II Length: 0.00

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 662,448 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $596,204

State $66,245

Other $0

Total $662,448

Project: M004190 Type Work: Signing
Descp:I-16 @ 17 LOCS BETWEEN CANDLER COUNTY & CHATHAM COUNTY Length: 0.00

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,250,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $3,250,000

State $0

Other $0

Total $3,250,000

81

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004191 Type Work: Signing
Descp:I-20 @ 22 LOCS BETWEEN NEWTON COUNTY & RICHMOND COUNTY Length: 0.00

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,820,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $3,820,000

State $0

Other $0

Total $3,820,000

Project: M005113 Type Work: Rest Area
Descp:P3 WELCOME CENTERS & REST AREAS LANDSCAPING & CUSTODIAL SW Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,550,000 $ 4,550,000 0

Phase CST

Fund State

Year 2015

Federal $0

State $4,550,000

Other $0

Total $4,550,000

Project: M005228 Type Work: Bridges
Descp:I-20 @ 8 LOCS IN DISTRICT 1 & 2 - BRIDGE PRESERVATION Length: 0.00

Phase PE CST

Fund IM NHPP

Year 2014 LUMP

Federal $9,000
$1,263,229

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,413,588 $ 10,000 0

Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $1,000
$140,359

Other $0 $0

Total $10,000
$1,403,588

Project: T003959 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 947,800 $0 0

Phase Fund CST Transit

Year 2015

Federal $758,240

State $94,780

Other $94,780

Total $947,800

Project: T003963 Type Work: Operating
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,031,750 $0 0

Phase Fund CST Transit

Year 2015

Federal $1,515,875

State $0

Other $1,515,875

Total $3,031,750

82

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T003967 Type Work: Operating
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,281,002 $0 0

Phase Fund CST Transit

Year 2015

Federal $3,140,501

State $0

Other $3,140,501

Total $6,281,002

Project: T003971 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,929,500 $0 0

Phase Fund CST Transit

Year 2015

Federal $2,343,600

State $292,950

Other $292,950

Total $2,929,500

Project: T003986 Type Work: Operating
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,009,210 $0 0

Phase Fund CST Transit

Year 2015

Federal $1,504,600

State $0

Other $1,504,610

Total $3,009,210

Project: T003990 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,154,950 $0 0

Phase Fund CST Transit

Year 2015

Federal $923,960

State $115,495

Other $115,495

Total $1,154,950

Project: T003994 Type Work: Operating
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,782,602 $0 0

Project Details: Includes T004110 Capital for Berrien

Phase Fund CST Transit

Year 2015

Federal $3,891,301

State $0

Other $3,891,301

Total $7,782,602

83

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T003998 Type Work: Operating
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,584,872 $0 0

Phase Fund CST Transit

Year 2015

Federal $1,792,436

State $0

Other $1,792,436

Total $3,584,872

Project: T004002 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,114,800 $0 0

Project Details: Includes T004111 Capital for Berrien

Project: T004006 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 734,400 $0 0

Phase Fund CST Transit

Year 2015

Federal $1,691,840

State $211,480

Other $211,480

Phase Fund CST Transit

Year 2015

Federal $587,520

State $73,440

Other $73,440

Total $2,114,800
Total $734,400

Project: T004016 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 527,900 $0 0

Phase Fund CST Transit

Year 2015

Federal $422,320

State $52,790

Other $52,790

Total $527,900

Project: T004017 Type Work: Operating
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,174,882 $0 0

Phase Fund CST Transit

Year 2015

Federal $1,087,441

State $0

Other $1,087,441

Total $2,174,882

84

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004061 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 DISCRETIONARY CAPITAL

Phase CST

Fund Transit

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,000 $0 0

Year 2015

Federal $240,000

State $30,000

Other $30,000

Total $300,000

Project: T004062 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Phase Fund CST Transit

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,573,843 $0 0

Project Details: Funding: Federal Share 80% with a 20% local match (e.g. Greyhound)

Project: T004063 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 DISCRETIONARY OPERATING Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 318,362 $0 0

Phase Fund CST Transit

Year 2015

Federal $2,059,074
Federal $159,181

State $0

Other $514,769

State $0

Other $159,181

Total $2,573,843
Total $318,362

Project: T004114 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 337,600 $0 0

Project Details: Moved State Match to Other/Local

Project: T004115 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 162,644 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2015

Federal $270,080

State $0

Other $67,520

Total $337,600

Phase Fund CST Transit

Year 2015

Federal $130,115

State $0

Other $32,529

Total $162,644

85

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004116 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 610,659 $0 0

Project Details: Moved State Match to Other/Local

Project: T004117 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 263,129 $0 0

Project Details: Moved State Match to Other/Local

Project: T004118 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 183,694 $0 0

Project Details: Moved State Match to Other/Local

Project: T004119 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 124,118 $0 0

Project Details: Moved State Match to Other/Local

Project: T004120 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 109,224 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2015

Federal $488,527

State $0

Other $122,132

Total $610,659

Phase Fund CST Transit

Year 2015

Federal $210,503

State $0

Other $52,626

Total $263,129

Phase Fund CST Transit

Year 2015

Federal $146,955

State $0

Other $36,739

Total $183,694

Phase Fund CST Transit

Year 2015

Federal $99,294

State $0

Other $24,824

Total $124,118

Phase Fund CST Transit

Year 2015

Federal $87,379

State $0

Other $21,845

Total $109,224

86

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004121 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 178,729 $0 0

Phase Fund CST Transit

Year 2015

Federal $142,983

State $35,746

Other $0

Total $178,729

Project: T004122 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 183,694 $0 0

Project Details: Moved State Match to Other/Local

Project: T004123 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 89,365 $0 0

Project Details: Moved State Match to Other/Local

Project: T004124 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 64,541 $0 0

Project Details: Moved State Match to Other/Local

Project: T004125 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 804,282 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2015

Federal $146,955

State $0

Other $36,739

Total $183,694

Phase Fund CST Transit

Year 2015

Federal $71,492

State $0

Other $17,873

Total $89,365

Phase Fund CST Transit

Year 2015

Federal $51,633

State $0

Other $12,908

Total $64,541

Phase Fund CST Transit

Year 2015

Federal $643,426

State $0

Other $160,856

Total $804,282

87

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004419 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 202,968 $0 0

Project Details: Moved State Match to Other/Local

Project: T004420 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 121,314 $0 0

Project Details: Moved State Match to Other/Local

Project: T004421 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 123,647 $0 0

Project Details: Moved State Match to Other/Local

Project: T004422 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 109,650 $0 0

Project Details: Moved State Match to Other/Local

Project: T004423 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 118,981 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2016

Federal $162,374

State $0

Other $40,594

Total $202,968

Phase Fund CST Transit

Year 2016

Federal $97,051

State $0

Other $24,263

Total $121,314

Phase Fund CST Transit

Year 2016

Federal $98,918

State $0

Other $24,729

Total $123,647

Phase Fund CST Transit

Year 2016

Federal $87,720

State $0

Other $21,930

Total $109,650

Phase Fund CST Transit

Year 2016

Federal $95,185

State $0

Other $23,796

Total $118,981

88

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004424 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 143,941 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2016

Project: T004426 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 86,320 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2016

Project: T004428 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 114,316 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2016

Project: T004429 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 417,602 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2016

Project: T004431 Type Work: Transit Projects
Descp:FY 2016 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Phase Fund CST Transit

Year 2016

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,567,729 $0 0

Project Details: Funding: Federal Share 80% with a 20% local match (e.g. Greyhound)

Federal $115,153
Federal $69,056
Federal $91,453
Federal $334,082
Federal $1,254,183

State $0

Other $28,788

State $0

Other $17,264

State $0

Other $22,863

State $0

Other $83,520

State $0

Other $313,546

Total $143,941
Total $86,320
Total $114,316
Total $417,602
Total $1,567,729

89

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004448 Type Work: Transit Projects
Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost:

$0

Total Project Authorizations:

$0

Total Parcels:

0

Phase Fund CST Transit

Year 2016

Federal $0

State $0

Other $0

Total $0

Project: T004449 Type Work: Transit Projects
Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 811,294 $0 0

Phase Fund CST Transit

Year 2016

Federal $649,035

State $81,129

Other $81,129

Total $811,294

Project: T004450 Type Work: Operating
Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,447,963 $0 0

Phase Fund CST Transit

Year 2016

Federal $2,223,982

State $0

Other $2,223,982

Total $4,447,963

Project: T004451 Type Work: Operating
Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,106,914 $0 0

Phase Fund CST Transit

Year 2016

Federal $4,053,457

State $0

Other $4,053,457

Total $8,106,914

Project: T004452 Type Work: Operating
Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,384,517 $0 0

Phase Fund CST Transit

Year 2016

Federal $1,192,259

State $0

Other $1,192,259

Total $2,384,517

90

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004453 Type Work: Operating
Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,196,357 $0 0

Phase Fund CST Transit

Year 2016

Federal $1,598,179

State $0

Other $1,598,179

Total $3,196,357

Project: T004454 Type Work: Transit Projects
Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 411,324 $0 0

Phase Fund CST Transit

Year 2016

Federal $329,059

State $41,132

Other $41,132

Total $411,324

Project: T004455 Type Work: Transit Projects
Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,768,161 $0 0

Phase Fund CST Transit

Year 2016

Federal $2,214,529

State $276,816

Other $276,816

Total $2,768,161

Project: T004456 Type Work: Transit Projects
Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 727,989 $0 0

Phase Fund CST Transit

Year 2016

Federal $582,391

State $72,799

Other $72,799

Total $727,989

Project: T004457 Type Work: Operating
Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,552,948 $0 0

Phase Fund CST Transit

Year 2016

Federal $3,276,474

State $0

Other $3,276,474

Total $6,552,948

91

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004458 Type Work: Operating
Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,054,733 $0 0

Phase Fund CST Transit

Year 2016

Federal $2,027,366

State $0

Other $2,027,366

Total $4,054,733

Project: T004459 Type Work: Transit Projects
Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,836,633 $0 0

Phase Fund CST Transit

Year 2016

Federal $1,469,306

State $183,663

Other $183,663

Total $1,836,633

Project: T004810 Type Work: Transit Projects
Descp:FY 2017 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Phase Fund CAP Transit

Year 2017

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,881,275 $0 0

Project Details: Funding: Federal Share 80% with a 20% local match (e.g. Greyhound)

Project: T004811 Type Work: Operating
Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,865,679 $0 0

Phase Fund OPR Transit

Year 2017

Federal $1,505,020
Federal $2,432,840

State $0

Other $376,255

State $0

Other $2,432,840

Total $1,881,275
Total $4,865,679

Project: T004812 Type Work: Operating
Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,863,537 $0 0

Phase Fund OPR Transit

Year 2017

Federal $3,931,769

State $0

Other $3,931,769

Total $7,863,537

92

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004813 Type Work: Operating
Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 9,728,297 $0 0

Phase Fund OPR Transit

Year 2017

Federal $4,864,148

State $0

Other $4,864,148

Total $9,728,297

Project: T004814 Type Work: Operating
Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,337,556 $0 0

Phase Fund OPR Transit

Year 2017

Federal $2,668,778

State $0

Other $2,668,778

Total $5,337,556

Project: T004815 Type Work: Operating
Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,835,629 $0 0

Phase Fund OPR Transit

Year 2017

Federal $1,917,814

State $0

Other $1,917,814

Total $3,835,629

Project: T004816 Type Work: Operating
Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,861,421 $0 0

Phase Fund OPR Transit

Year 2017

Federal $1,430,710

State $0

Other $1,430,710

Total $2,861,421

Project: T004817 Type Work: Transit Projects
Descp:FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,203,959 $0 0

Phase Fund CAP Transit

Year 2017

Federal $1,763,167

State $220,396

Other $220,396

Total $2,203,959

93

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004818 Type Work: Transit Projects
Descp:FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 873,586 $0 0

Phase Fund CAP Transit

Year 2017

Federal $698,869

State $87,359

Other $87,359

Total $873,586

Project: T004819 Type Work: Transit Projects
Descp:FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,321,793 $0 0

Phase Fund CAP Transit

Year 2017

Federal $2,657,435

State $332,179

Other $332,179

Total $3,321,793

Project: T004820 Type Work: Transit Projects
Descp:FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 493,589 $0 0

Phase Fund OPR Transit

Year 2017

Federal $394,871

State $49,359

Other $49,359

Total $493,589

Project: T004821 Type Work: Transit Projects
Descp:FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 973,552 $0 0

Phase Fund CAP Transit

Year 2017

Federal $778,842

State $97,355

Other $97,355

Total $973,552

Project: T004822 Type Work: Transit Projects
Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 103,584 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CAP Transit

Year 2017

Federal $82,867

State $0

Other $20,717

Total $103,584

94

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004823 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 187,881 $0 0

Project Details: Moved State Match to Other/Local

Project: T004824 Type Work: Transit Projects
Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 172,729 $0 0

Project Details: Moved State Match to Other/Local

Project: T004825 Type Work: Transit Projects
Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 142,777 $0 0

Project Details: Moved State Match to Other/Local

Project: T004826 Type Work: Transit Projects
Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 131,580 $0 0

Project Details: Moved State Match to Other/Local

Project: T004827 Type Work: Transit Projects
Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 148,376 $0 0

Phase Fund CAP Transit

Year 2017

Federal $150,305

State $0

Other $37,576

Total $187,881

Phase Fund CAP Transit

Year 2017

Federal $138,183

State $0

Other $34,546

Total $172,729

Phase Fund CAP Transit

Year 2017

Federal $114,222

State $0

Other $28,555

Total $142,777

Phase Fund CAP Transit

Year 2017

Federal $105,264

State $0

Other $26,316

Total $131,580

Phase Fund CAP Transit

Year 2017

Federal $118,701

State $0

Other $29,675

Total $148,376

95

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T004828 Type Work: Transit Projects
Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 145,577 $0 0

Project Details: Moved State Match to Other/Local

Project: T004829 Type Work: Transit Projects
Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 501,000 $0 0

Project Details: Moved State Match to Other/Local

Project: T004830 Type Work: Transit Projects
Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 137,179 $0 0

Project Details: Moved State Match to Other/Local

Project: T004831 Type Work: Transit Projects
Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 145,577 $0 0

Project Details: Moved State Match to Other/Local

Project: T004832 Type Work: Transit Projects
Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 243,562 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CAP Transit

Year 2017

Federal $116,461

State $0

Other $29,115

Total $145,577

Phase Fund CAP Transit

Year 2017

Federal $400,800

State $0

Other $100,200

Total $501,000

Phase Fund CAP Transit

Year 2017

Federal $109,743

State $0

Other $27,436

Total $137,179

Phase Fund OPR Transit

Year 2017

Federal $116,461

State $0

Other $29,115

Total $145,577

Phase Fund CAP Transit

Year 2017

Federal $194,849

State $0

Other $48,712

Total $243,562

96

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T005114 Type Work: Operating

Descp:FY 2018 SECTION 5311 OPERATING FOR DOT

DISTRICT 1

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,145,092 $ 6,145,092 0

Phase Fund OPR Transit

Year 2018

Federal $3,072,546

State $0

Other $3,072,546

Total $6,145,092

Project: T005115 Type Work: Operating

Descp:FY 2018 SECTION 5311 OPERATING FOR DOT

DISTRICT 2

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,780,238 $ 4,780,238 0

Phase Fund OPR Transit

Year 2018

Federal $2,390,119

State $0

Other $2,390,119

Total $4,780,238

Project: T005117 Type Work: Transit Projects

Descp:FY 2018 SECTION 5311 OPERATING FOR DOT

DISTRICT 4

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 20,357,500 $0 0

Phase Fund OPR Transit

Year 2018

Federal $10,178,750

State

Other

$0 $10,178,750

Total $20,357,500

Project: T005118 Type Work: Transit Projects

Descp:FY 2018 SECTION 5311 OPERATING FOR DOT

DISTRICT 5

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,177,180 $0 0

Phase Fund OPR Transit

Year 2018

Federal $1,588,590

State $0

Other $1,588,590

Total $3,177,180

Project: T005119 Type Work: Transit Projects

Descp:FY 2018 SECTION 5311 OPERATING FOR DOT

DISTRICT 6

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 10,785,914 $0 0

Phase Fund OPR Transit

Year 2018

Federal $5,392,957

State $0

Other $5,392,957

Total $10,785,914

97

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T005120 Type Work: Transit Projects

Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT

DISTRICT 1

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,625 $0 0

Project: T005121 Type Work: Transit Projects

Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT

DISTRICT 2

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 277,691 $0 0

Project: T005122 Type Work: Transit Projects

Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT

DISTRICT 3

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 369,686 $0 0

Project: T005123 Type Work: Transit Projects

Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT

DISTRICT 4

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,048,505 $0 0

Project: T005124 Type Work: Transit Projects

Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT

DISTRICT 5

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 462,502 $0 0

Phase Fund CAP Transit

Year 2018

Federal $240,500

State $30,063

Other $30,063

Total $300,625

Phase Fund CAP Transit

Year 2018

Federal $222,153

State $27,769

Other $27,769

Total $277,691

Phase Fund CAP Transit

Year 2018

Federal $295,749

State $36,969

Other $36,969

Total $369,686

Phase Fund CAP Transit

Year 2018

Federal $838,804

State $104,851

Other $104,851

Total $1,048,505

Phase Fund CAP Transit

Year 2018

Federal $370,002

State $46,250

Other $46,250

Total $462,502

98

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: T005125 Type Work: Transit Projects

Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT

DISTRICT 6

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 518,751 $0 0

Phase Fund CAP Transit

Year 2018

Federal $415,001

State $51,875

Other $51,875

Total $518,751

99

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project PI#
0000694 0006123 0006130 0006137 0006165 0006167 0006172 0006179 0006186 0006193 0006200 0006207 0006214 0006221 0006228 0006235 0006367 0006368 0006369 0007498 0007505 0007507 0007552 0007700 0007701 0007702 0008326 0008333 0008334 0008639 0009224 0009555 0009574 0009575 0009577 0009578 0009581 0009581 0009582 0009583 0009587 0009588 0009589 0009590 0009591 0009592 0009594 0009594 0009595 0009595

Year
2015 2015 2015 2015 2015 2016 2015 2015 2015 2015 2015 2015 2015 2015 2015 2015 2015 2016 2017 2015 2015 2016 2015 2016 2017 2018 2015 2015 2016 2016 2015 2015 2016 2017 2015 2017 2015 2015 2016 2017 2015 2016 2017 2015 2016 2017 2015 2015 2016 2016

Phase
CST ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL CST CST CST ALL ALL ALL PE CST CST CST ALL ALL ALL ALL ALL PE PE PE PE PE CST CST CST CST PE PE PE PE PE PE PE PE PE PE

All Counties Totals Summary
County Summary excludes lump sum projects.

Fund
STP STP HSIP STP NHPP NHPP NHPP STP STP NHPP HSIP STP HSIP STP STP STP NHPP NHPP NHPP STP TAP TAP HPP NHPP NHPP NHPP Safety Safety Safety Safety Safety STP STP STP NHPPX NHPPX STP STP STP STP STP STP STP CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ

Federal
$400,000 $15,200,000 $63,000,000
$5,600,000 $800,000 $800,000
$10,800,000 $58,918,886 $10,000,000 $34,400,000
$4,400,000 $800,000
$3,800,000 $12,000,000
$400,000 $960,000 $150,513,568 $150,513,568 $150,513,568 $10,760,000 $1,000,000 $1,000,000 $1,799,800 $6,000,000 $6,000,000 $6,000,000 $1,345,222 $810,000 $810,270 $2,880,000 $546,170 $280,000 $6,800,000 $6,800,000 $2,000,000 $2,000,000 $8,800,000 $14,228,000 $23,257,600 $23,725,772 $1,000,000 $1,000,000 $1,000,000 $960,000 $960,000 $960,000 $820,000 $4,944,000 $820,000 $4,944,000

State
$100,000 $0
$7,000,000 $1,400,000
$200,000 $200,000 $1,200,000 $14,729,722 $2,500,000 $8,600,000
$0 $200,000
$0 $3,000,000
$100,000 $240,000 $37,628,392 $37,628,392 $37,628,392 $2,690,000 $250,000 $250,000 $449,950 $1,500,000 $1,500,000 $1,500,000
$0 $0 $0 $320,000 $0 $70,000 $1,700,000 $1,700,000 $500,000 $500,000 $2,200,000 $3,557,000 $5,814,400 $5,931,443 $0 $0 $0 $240,000 $240,000 $240,000 $0 $1,236,000 $0 $1,236,000

Other
$0 $3,800,000
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total
$500,000 $19,000,000 $70,000,000
$7,000,000 $1,000,000 $1,000,000 $12,000,000 $73,648,608 $12,500,000 $43,000,000 $4,400,000 $1,000,000 $3,800,000 $15,000,000
$500,000 $1,200,000 $188,141,960 $188,141,960 $188,141,960 $13,450,000 $1,250,000 $1,250,000 $2,249,750 $7,500,000 $7,500,000 $7,500,000 $1,345,222
$810,000 $810,270 $3,200,000 $546,170 $350,000 $8,500,000 $8,500,000 $2,500,000 $2,500,000 $11,000,000 $17,785,000 $29,072,000 $29,657,215 $1,000,000 $1,000,000 $1,000,000 $1,200,000 $1,200,000 $1,200,000 $820,000 $6,180,000 $820,000 $6,180,000
100

0009596 0009596 0009717 0009738 0009739 0009740 0009742 0009743 0009744 0009746 0009747 0009748 0009755 0009758 0009759 0009760 0009762 0009763 0009764 0009766 0009767 0009768 0009770 0009771 0009772 0009774 0009775 0009776 0009778 0009779 0009780 0009782 0009783 0009784 0009786 0009787 0009790 0009791 0009792 0009794 0009795 0010151 0010152 0010153 0010154 0010169 0010170 0010171 0010172 0010300 0010301 0010302 0010312 0010312 0010312

STATE TRANSPORTATION IMPROVEMENT PROGRAM

2017

PE

2017

PE

2018

CST

2016

ALL

2017

ALL

2018

ALL

2016

ALL

2017

ALL

2018

ALL

2016

ALL

2017

ALL

2018

ALL

2018

ALL

2016

ALL

2017

ALL

2018

ALL

2016

ALL

2017

ALL

2018

ALL

2016

ALL

2017

ALL

2018

ALL

2016

ALL

2017

ALL

2018

ALL

2016

ALL

2017

ALL

2018

ALL

2016

ALL

2017

ALL

2018

ALL

2016

ALL

2017

ALL

2018

ALL

2016

ALL

2017

ALL

2016

ALL

2017

ALL

2018

ALL

2017

ALL

2018

ALL

2015

PE

2016

PE

2017

PE

2018

PE

2015

PE

2016

PE

2017

PE

2018

PE

2016

ALL

2017

ALL

2018

ALL

2016

PE

2015

PE

2017

PE

CMAQ CMAQ NHPP
STP STP STP HSIP HSIP HSIP STP STP STP NHPP STP STP STP STP STP STP NHPP NHPP NHPP HSIP HSIP HSIP STP STP STP HSIP HSIP HSIP STP STP STP STP STP STP STP STP TAP TAP STP STP STP STP Enhance STP STP STP NHPP NHPP NHPP State State State

$820,000 $4,944,000 $148,197,128 $15,200,000 $15,200,000 $15,200,000 $67,365,000 $67,500,000 $72,000,000 $4,800,000 $5,600,000 $5,600,000
$800,000 $51,791,784 $45,040,000 $49,680,000 $12,000,000 $12,000,000 $12,000,000 $27,200,000 $25,600,000 $25,040,000
$4,400,000 $4,400,000 $4,400,000
$400,000 $800,000 $800,000 $3,800,000 $3,800,000 $3,800,000 $12,000,000 $10,400,000 $10,400,000 $600,000 $400,000 $10,400,000 $9,600,000 $9,600,000 $1,000,000 $1,000,000 $280,000 $280,000 $280,000 $280,000
$32,000 $80,000 $80,000 $80,000 $9,000,000 $10,800,000 $10,800,000
$0 $0 $0

$0 $1,236,000 $37,049,282
$0 $0 $0 $7,485,000 $7,500,000 $8,000,000 $1,200,000 $1,400,000 $1,400,000 $200,000 $12,947,946 $11,260,000 $12,420,000 $3,000,000 $3,000,000 $3,000,000 $6,800,000 $6,400,000 $6,260,000 $0 $0 $0 $100,000 $200,000 $200,000 $0 $0 $0 $3,000,000 $2,600,000 $2,600,000 $150,000 $100,000 $2,600,000 $2,400,000 $2,400,000 $250,000 $250,000 $70,000 $70,000 $70,000 $70,000 $8,000 $20,000 $20,000 $20,000 $1,000,000 $1,200,000 $1,200,000 $0 $0 $0

$0 $0 $0 $3,800,000 $3,800,000 $3,800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $110,000 $110,000 $110,000

$820,000 $6,180,000 $185,246,410 $19,000,000 $19,000,000 $19,000,000 $74,850,000 $75,000,000 $80,000,000 $6,000,000 $7,000,000 $7,000,000 $1,000,000 $64,739,730 $56,300,000 $62,100,000 $15,000,000 $15,000,000 $15,000,000 $34,000,000 $32,000,000 $31,300,000 $4,400,000 $4,400,000 $4,400,000
$500,000 $1,000,000 $1,000,000 $3,800,000 $3,800,000 $3,800,000 $15,000,000 $13,000,000 $13,000,000
$750,000 $500,000 $13,000,000 $12,000,000 $12,000,000 $1,250,000 $1,250,000 $350,000 $350,000 $350,000 $350,000
$40,000 $100,000 $100,000 $100,000 $10,000,000 $12,000,000 $12,000,000 $110,000 $110,000 $110,000

101

0010312 0010833 0010834 0010908 0010909 0010919 0010920 0012684 0012684 0012685 0012685 0012686 0012686 0012687 0012687 0012713 0012714 0012715 0012716 0012718 0012719 0012720 0012721 0012761 0012762 0012763 0012765 0012766 0012767 0012807 0012810 0012811 0012812 0012852 0012853 0012945 0012950 0012955 0012960 0012964 0012965 0012970 0012975 0012982 0012983 0012988 0012989 0012994 0012995 0013057 0013059 0013070 0013071 0013072 0013073

STATE TRANSPORTATION IMPROVEMENT PROGRAM

2018 2015 2016 2015 2016 2016 2017 2015 2015 2016 2016 2017 2017 2018 2018 2015 2016 2017 2018 2015 2016 2017 2018 2015 2016 2017 2015 2016 2017 2015 2015 2016 2017 2015 2016 2018 2018 2018 2018 2017 2018 2018 2018 2017 2018 2017 2018 2017 2018 2016 2017 2015 2016 2017 2018

PE

State

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

NHPP

CST

NHPP

PE

NHPP

CST

NHPP

PE

NHPP

CST

NHPP

PE

NHPP

CST

NHPP

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

STP

PE

STP

PE

STP

ALL

STP

ALL

STP

ALL

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

NHPPX

CST

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

NHPPX

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

$0 $960,000 $960,000 $2,307,772 $4,039,120 $280,000 $280,000 $450,000 $4,050,000 $450,000 $4,500,000 $450,000 $4,050,000 $450,000 $4,050,000 $300,000 $300,000 $300,000 $300,000 $200,000 $200,000 $200,000 $200,000 $480,000 $480,000 $480,000 $4,000,000 $2,800,000 $4,000,000 $240,000 $115,000 $115,000 $115,000 $400,000 $400,000 $6,800,000 $2,000,000 $24,000,000 $1,000,000 $1,000,000 $280,000 $480,000 $115,000 $1,200,000 $1,200,000 $4,039,120 $4,039,120 $400,000 $400,000 $2,000,000 $1,600,000 $120,000 $120,000 $120,000 $120,000

$0 $240,000 $240,000 $576,943 $1,009,780
$70,000 $70,000 $50,000 $450,000 $50,000 $500,000 $50,000 $450,000 $50,000 $450,000
$0 $0 $0 $0 $0 $0 $0 $0 $120,000 $120,000 $120,000 $1,000,000 $700,000 $1,000,000 $60,000 $0 $0 $0 $100,000 $100,000 $1,700,000 $500,000 $6,000,000 $0 $0 $70,000 $120,000 $0 $300,000 $300,000 $1,009,780 $1,009,780 $100,000 $100,000 $500,000 $400,000 $30,000 $30,000 $30,000 $30,000

$110,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$110,000 $1,200,000 $1,200,000 $2,884,715 $5,048,900
$350,000 $350,000 $500,000 $4,500,000 $500,000 $5,000,000 $500,000 $4,500,000 $500,000 $4,500,000 $300,000 $300,000 $300,000 $300,000 $200,000 $200,000 $200,000 $200,000 $600,000 $600,000 $600,000 $5,000,000 $3,500,000 $5,000,000 $300,000 $115,000 $115,000 $115,000 $500,000 $500,000 $8,500,000 $2,500,000 $30,000,000 $1,000,000 $1,000,000 $350,000 $600,000 $115,000 $1,500,000 $1,500,000 $5,048,900 $5,048,900 $500,000 $500,000 $2,500,000 $2,000,000 $150,000 $150,000 $150,000 $150,000
102

0013105 0013105 0013181 0013182 0013183 0013188 0013190 0013227 0013227 0013233 0013234 0013265 M003378 M003379 M003380 M005113 T003959 T003963 T003967 T003971 T003986 T003990 T003994 T003998 T004002 T004006 T004016 T004017 T004061 T004062 T004063 T004114 T004115 T004116 T004117 T004118 T004119 T004120 T004121 T004122 T004123 T004124 T004125 T004419 T004420 T004421 T004422 T004423 T004424 T004426 T004428 T004429 T004431 T004448 T004449

STATE TRANSPORTATION IMPROVEMENT PROGRAM

2018

PE

2018

PE

2016

PE

2017

PE

2018

PE

2018

ALL

2018

CST

2015

PE

2015

CST

2016

ALL

2017

ALL

2015

UTL

2016

CST

2017

CST

2018

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

CMAQ CMAQ
STP STP STP STP CMAQ Bond Bond STP STP State STP STP STP State Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit

$820,000 $4,944,000 $11,512,480 $11,242,000 $11,137,600 $4,000,000
$400,000 $0 $0
$960,000 $960,000
$0 $14,400,000 $12,000,000 $12,000,000
$0 $758,240 $1,515,875 $3,140,501 $2,343,600 $1,504,600 $923,960 $3,891,301 $1,792,436 $1,691,840 $587,520 $422,320 $1,087,441 $240,000 $2,059,074 $159,181 $270,080 $130,115 $488,527 $210,503 $146,955
$99,294 $87,379 $142,983 $146,955 $71,492 $51,633 $643,426 $162,374 $97,051 $98,918 $87,720 $95,185 $115,153 $69,056 $91,453 $334,082 $1,254,183
$0 $649,035

$0 $1,236,000 $2,878,120 $2,810,500 $2,784,400 $1,000,000
$100,000 $150,000 $5,350,000 $240,000 $240,000
$0 $3,600,000 $3,000,000 $3,000,000 $4,550,000
$94,780 $0 $0
$292,950 $0
$115,495 $0 $0
$211,480 $73,440 $52,790
$0 $30,000
$0 $0 $0 $0 $0 $0 $0 $0 $0 $35,746 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $81,129

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,500,000 $0 $0 $0 $0 $94,780 $1,515,875 $3,140,501 $292,950 $1,504,610 $115,495 $3,891,301 $1,792,436 $211,480 $73,440 $52,790 $1,087,441 $30,000 $514,769 $159,181 $67,520 $32,529 $122,132 $52,626 $36,739 $24,824 $21,845 $0 $36,739 $17,873 $12,908 $160,856 $40,594 $24,263 $24,729 $21,930 $23,796 $28,788 $17,264 $22,863 $83,520 $313,546 $0 $81,129

$820,000 $6,180,000 $14,390,600 $14,052,500 $13,922,000 $5,000,000
$500,000 $150,000 $5,350,000 $1,200,000 $1,200,000 $4,500,000 $18,000,000 $15,000,000 $15,000,000 $4,550,000 $947,800 $3,031,750 $6,281,002 $2,929,500 $3,009,210 $1,154,950 $7,782,602 $3,584,872 $2,114,800 $734,400 $527,900 $2,174,882 $300,000 $2,573,843 $318,362 $337,600 $162,644 $610,659 $263,129 $183,694 $124,118 $109,224 $178,729 $183,694
$89,365 $64,541 $804,282 $202,968 $121,314 $123,647 $109,650 $118,981 $143,941 $86,320 $114,316 $417,602 $1,567,729
$0 $811,294
103

STATE TRANSPORTATION IMPROVEMENT PROGRAM

T004450 T004451 T004452 T004453 T004454 T004455 T004456 T004457 T004458 T004459 T004810 T004811 T004812 T004813 T004814 T004815 T004816 T004817 T004818 T004819 T004820 T004821 T004822 T004823 T004824 T004825 T004826 T004827 T004828 T004829 T004830 T004831 T004832 T005114 T005115 T005117 T005118 T005119 T005120 T005121 T005122 T005123 T005124 T005125

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2017

CAP

2017

OPR

2017

OPR

2017

OPR

2017

OPR

2017

OPR

2017

OPR

2017

CAP

2017

CAP

2017

CAP

2017

OPR

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

OPR

2017

CAP

2018

OPR

2018

OPR

2018

OPR

2018

OPR

2018

OPR

2018

CAP

2018

CAP

2018

CAP

2018

CAP

2018

CAP

2018

CAP

Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit

$2,223,982 $4,053,457 $1,192,259 $1,598,179
$329,059 $2,214,529
$582,391 $3,276,474 $2,027,366 $1,469,306 $1,505,020 $2,432,840 $3,931,769 $4,864,148 $2,668,778 $1,917,814 $1,430,710 $1,763,167
$698,869 $2,657,435
$394,871 $778,842
$82,867 $150,305 $138,183 $114,222 $105,264 $118,701 $116,461 $400,800 $109,743 $116,461 $194,849 $3,072,546 $2,390,119 $10,178,750 $1,588,590 $5,392,957 $240,500 $222,153 $295,749 $838,804 $370,002 $415,001

$0 $0 $0 $0 $41,132 $276,816 $72,799 $0 $0 $183,663 $0 $0 $0 $0 $0 $0 $0 $220,396 $87,359 $332,179 $49,359 $97,355 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $30,063 $27,769 $36,969 $104,851 $46,250 $51,875

$2,223,982 $4,053,457 $1,192,259 $1,598,179
$41,132 $276,816
$72,799 $3,276,474 $2,027,366
$183,663 $376,255 $2,432,840 $3,931,769 $4,864,148 $2,668,778 $1,917,814 $1,430,710 $220,396
$87,359 $332,179
$49,359 $97,355 $20,717 $37,576 $34,546 $28,555 $26,316 $29,675 $29,115 $100,200 $27,436 $29,115 $48,712 $3,072,546 $2,390,119 $10,178,750 $1,588,590 $5,392,957 $30,063 $27,769 $36,969 $104,851 $46,250 $51,875

$4,447,963 $8,106,914 $2,384,517 $3,196,357
$411,324 $2,768,161
$727,989 $6,552,948 $4,054,733 $1,836,633 $1,881,275 $4,865,679 $7,863,537 $9,728,297 $5,337,556 $3,835,629 $2,861,421 $2,203,959
$873,586 $3,321,793
$493,589 $973,552 $103,584 $187,881 $172,729 $142,777 $131,580 $148,376 $145,577 $501,000 $137,179 $145,577 $243,562 $6,145,092 $4,780,238 $20,357,500 $3,177,180 $10,785,914 $300,625 $277,691 $369,686 $1,048,505 $462,502 $518,751

$1,902,277,283

$390,527,866

$92,573,853

$2,385,379,002

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

104

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Appling

Project: 0001216 Type Work: Replace Bridge
Descp:SR 4/US 1 @ ALTAMAHA RIVER; OVERFLOW & WILLIAMS CREEK - TIA Length: 1.56

Phase CST CST

Fund State Bond

Year 2014 2015

Federal $0 $0

State $0
$20,256,273

Other $4,969,781
$0

Total $4,969,781 $20,256,273

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 25,226,054 $ 4,969,781 7

Project Details: Widen bridges from 2 to 4 lanes-improve operation and mobility-reduce crash frequency-enhance
economic development-on a GRIP corridor-on State Freight corridor

Also in Toombs County

Project: 0008976 Type Work: TE-Landscape/Beautify
Descp:ALTAMAHA TECHNICAL COLLEGE LANDSCAPE IMPROVEMENTS Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 106,250 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $85,000

State $0

Other $21,250

Total $106,250

Project: 531340- Type Work: Replace Bridge
Descp:CR 305/CR 530 @ BIG SATILLA CREEK & OVERFLOW Length: 0.60

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,145,751 $ 108,120 1

Phase ROW CST CST UTL

Fund Local STP STP Local

Year 2014 2016 2016 2016

Federal $0
$1,295,685 $2,630,634
$0

State $0 $0
$657,658 $0

Other $108,120 $323,921
$0 $129,733

Total $108,120 $1,619,606 $3,288,292 $129,733

Also in Pierce County

Project: M004830 Type Work: Resurface & Maintenance Descp:SR 144 FROM SR 27 TO SR 121
Length: 14.80

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,869,679 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,295,743

State $573,936

Other $0

Total $2,869,679

105

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005170 Type Work: Resurface & Maintenance
Descp:SR 19 FROM BACON COUNTY LINE TO SR 135 CONN Length: 10.96

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,264,475 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,811,580

State $452,895

Other $0

Total $2,264,475

Also in Jeff Davis County

Appling Totals Summary
County Summary excludes lump sum projects.

Project PI#
0001216 531340531340531340-

Year
2015 2016 2016 2016

Phase
CST CST CST UTL

Fund
Bond STP STP Local

Federal
$0 $1,762,524
$868,109 $0

State
$2,633,316 $440,631 $0 $0

Other
$0 $0 $217,027 $86,921

Total
$2,633,316 $2,203,156 $1,085,136
$86,921

$2,630,634

$3,073,947

$303,948

$6,008,528

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

106

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Atkinson

Project: 0010572 Type Work: TE-Bike/Ped Facility
Descp:SR 520 FM CS 515/KIRKLAND ST TO NEW HEALTH DEPT; INC NEW LOC Length: 0.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 192,261 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $153,809

State $0

Other $38,452

Project: 0010573 Type Work: TE-Bike/Ped Facility
Descp:CS 742/RAILROAD STREET FROM SR 135 TO CS 741/FLORIDA ROAD Length: 0.11

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 249,994 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $199,995

State $0

Other $49,999

Project: 0010574 Type Work: TE-Bike/Ped Facility
Descp:CS 500/RAILROAD AVE FROM SR 31 TO CS 503/KING STREET Length: 0.86

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 187,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $150,000

State $0

Other $37,500

Project: M004825 Type Work: Resurface & Maintenance
Descp:SR 520/US 82 FROM CR 212/KIRKLAND RD TO CS 515/KIRKLAND ST Length: 1.73

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 689,515 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $551,612

State $137,903

Other $0

Total $192,261
Total $249,994
Total $187,500
Total $689,515

107

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004826 Type Work: Resurface & Maintenance
Descp:SR 89/US 441 FROM CLINCH COUNTY LINE TO SR 31 Length: 5.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 611,088 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $488,870

State $122,218

Other $0

Total $611,088

Project: M005082 Type Work: Resurface & Maintenance
Descp:SR 520 FM TIFT COUNTY LINE TO W OF WILLACOOCHEE CITY LIMITS Length: 18.66

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,224,636 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $4,979,709

State $1,244,927

Other $0

Total $6,224,636

Also in Berrien County

108

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Bacon

Project: 0010575 Type Work: TE-Bike/Ped Facility
Descp:SR 32 FROM CS 512/CHURCH STREET TO SR 4/US 1 Length: 0.27

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 187,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $150,000

State $0

Other $37,500

Project: M004831 Type Work: Resurface & Maintenance
Descp:SR 4 FROM N OF CR 118/BEACH RD TO N OF CR 252/TADPOLE TRAIL Length: 9.77

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 764,520 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $611,616

State $152,904

Other $0

Project: M004832 Type Work: Resurface & Maintenance
Descp:SR 32 FROM HURRICANE CREEK TO CR 280/DEDGE FARM ROAD Length: 2.15

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 803,993 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $643,194

State $160,799

Other $0

Total $187,500
Total $764,520
Total $803,993

109

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Baker

Project: 0007153 Type Work: Replace Bridge Descp:SR 200 @ ICHAWAYNOCHAWAY CREEK

Length: 0.32

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,929,690 $0 4

Phase ROW CST

Fund STP STP

Year 2015 2017

Federal $93,220
$3,050,532

State $23,305 $762,633

Other $0 $0

Total $116,525
$3,813,165

Project: 0007154 Type Work: Replace Bridge Descp:SR 216 @ ICHAWAYNOCHAWAY CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,252,853 $0 5

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2017 2017 2017 2017

Federal $8,000
$103,048 $1,673,171
$18,064

State $2,000
$25,762 $418,293
$4,516

Other $0 $0 $0 $0

Total $10,000
$128,809 $2,091,463
$22,580

Project: M004827 Type Work: Resurface & Maintenance
Descp:SR 91 FROM SR 37 TO DOUGHERTY COUNTY LINE Length: 10.80

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,325,059 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,060,047

State $265,012

Other $0

Total $1,325,059

Project: M004828 Type Work: Resurface & Maintenance Descp:SR 200 FROM SR 91 TO EARLY COUNTY LINE
Length: 18.70

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,130,324 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,504,259

State $626,065

Other $0

Total $3,130,324

110

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Baker Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007153 0007153 0007154 0007154 0007154 0007154

Year
2015 2017 2017 2017 2017 2017

Phase
ROW CST PE ROW CST UTL

Fund
STP STP STP STP STP STP

Federal
$93,220 $3,050,532
$8,000 $103,048 $1,673,171
$18,064

State
$23,305 $762,633
$2,000 $25,762 $418,293
$4,516

Other
$0 $0 $0 $0 $0 $0

Total
$116,525 $3,813,165
$10,000 $128,809 $2,091,463
$22,580

$4,946,034

$1,236,509

$0

$6,182,542

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

111

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Baldwin

Project: 0010455 Type Work: Bicycle/Ped. Facility
Descp:BALDWIN COUNTY SCHOOL SYSTEM @ 5 SCHOOLS - SRTS Length: 0.00

Phase CST

Fund Safety

Year LUMP

Federal $540,103

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 540,103 $0 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2015 - FY 2018

State $0

Other $0

Total $540,103

Project: 0010711 Type Work: TE-Bike/Ped Facility
Descp:HISTORIC DOWNTOWN MILLEDGEVILLE STREETSCAPE @ 5 LOCS - PH IV Length: 0.76

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,100,000 $0 22

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $880,000

State $0

Other $220,000

Total $1,100,000

Project: 0010712 Type Work: TE-Bike/Ped Facility
Descp:OCONEE RIVER GREENWAY & RIVERWALK @ FISHING CREEK - PH III Length: 1.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,250,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $1,000,000

State $0

Other $250,000

Total $1,250,000

Project: 0013260 Type Work: Pedestrian Crossings
Descp:SR 22; SR 24; SR 29; SR 44 & SR 57 @ 5 LOCS PED UPGRADES Length: 2.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 795,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $153,000 $562,500

State $17,000 $62,500

Other $0 $0

Total $170,000 $625,000

Also in Putnam, Wilkinson County

Project: 270900- Type Work: Replace Bridge
Descp:CS 685/BARROWS FERRY RD @ TOBLER CREEK NE MILLEDGEVILLE Length: 0.21

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $102,000
$10,824 $510,000
$10,200

112

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004815 Type Work: Resurface & Maintenance Descp:SR 24 FROM SR 22 TO CS 328/MARSHALL ROAD
Length: 4.12

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,642,084 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,313,667

State $328,417

Other $0

Total $1,642,084

Project: M004816 Type Work: Resurface & Maintenance
Descp:SR 22 FROM JONES COUNTY LINE TO LITTLE FISHING CREEK Length: 7.00

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,341,310 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,073,048

State $268,262

Other $0

Total $1,341,310

Project: M004817 Type Work: Resurface & Maintenance Descp:SR 49 FROM JONES COUNTY LINE TO SR 22
Length: 11.20

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,120,570 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $3,296,456

State $824,114

Other $0

Total $4,120,570

Project: M004818 Type Work: Resurface & Maintenance Descp:SR 212 FROM PUTNAM COUNTY LINE TO SR 22
Length: 10.70

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,296,326 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,837,061

State $459,265

Other $0

Total $2,296,326

Project: M004819 Type Work: Resurface & Maintenance
Descp:SR 22 FM E OF CR 171/OLD COUNTRY CLUB RD TO HANCOCK CO LINE Length: 9.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,762,864 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,410,291

State $352,573

Other $0

Total $1,762,864

113

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004850 Type Work: Resurface & Maintenance Descp:SR 243 FROM SR 29/US 441 TO SR 22
Length: 4.60

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,762,907 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,410,325

State $352,581

Other $0

Total $1,762,907

Project: M005108 Type Work: Bridges
Descp:SR 22 @ 2 LOCS IN BALDWIN CO & SR 150 @ 1 LOC IN MCDUFFIE CO Length: 1.20

Phase PE CST

Fund STP STP

Year 2014 LUMP

Federal $128,000 $600,000

State $32,000 $150,000

Other $0 $0

Total $160,000 $750,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 910,000 $ 160,000 0

Project Details: Substructure strengthening - deck rehab painting - joint replacement and co-polymer overlay
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Also in McDuffie County

Project: M005187 Type Work: Resurface & Maintenance
Descp:SR 29 FM CR 162/JOHNS GOLDEN RD/WILKINSON TO SR 243/BALDWIN Length: 4.89

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,161,884 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $929,508

State $232,377

Other $0

Total $1,161,884

Also in Wilkinson County

Baldwin Totals Summary
County Summary excludes lump sum projects.

Project PI# 270900-

Year 2016

Phase ROW

Fund Local

Federal $0

State $0

Other $10,824

Total $10,824

$0

$0

$10,824

$10,824

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

114

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Banks

Project: 0007023 Type Work: Replace Bridge Descp:SR 59 @ GROVE CREEK

Length: 0.13

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,870,790 $ 250,000 0

Phase PE
ROW CST

Fund Bridge STP STP

Year 2014 2016 2017

Federal $200,000 $86,561
$1,210,071

State $50,000 $21,640 $302,518

Other $0 $0 $0

Total $250,000 $108,202 $1,512,588

Project: 0007156 Type Work: Replace Bridge
Descp:SR 98 @ HICKORY LEVEL CREEK 3.5 MI SW OF HOMER Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,051,204 $0 5

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2017 2017

Federal $252,960
$1,301,090 $86,913

State $63,240 $325,273 $21,728

Other $0 $0 $0

Total $316,200 $1,626,363 $108,641

Project: 0007157 Type Work: Replace Bridge
Descp:SR 323 @ GROVE CREEK 6.5 MI WEST OF HOMER Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,929,746 $0 5

Phase ROW CST

Fund STP STP

Year 2016 2017

Federal $86,561
$1,457,236

State $21,640 $364,309

Other $0 $0

Total $108,202 $1,821,545

Project: 0007158 Type Work: Replace Bridge
Descp:SR 63 @ MIDDLE FORK BROAD RIVER 9 MI NE OF HOMER Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,349,254 $0 6

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Federal $61,200
$1,787,641 $30,563

State $15,300 $446,910
$7,641

Other $0 $0 $0

Total $76,500
$2,234,551 $38,203

Project: 0013154 Type Work: RRX Warning Device
Descp:RAILROAD CROSSING UPGRADES @SEV LOC FM TOCCOA TO OAKWOOD Length: 0.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 505,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $5,000
$500,000

State $0 $0

Other $0 $0

Total $5,000
$500,000

Also in Habersham, Hall, Stephens County

115

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013236 Type Work: Signing
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 15 CR LOCS IN BANKS COUNTY Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 275,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $275,000

State $0

Other $0

Total $275,000

Project: M004808 Type Work: Resurface & Maintenance
Descp:I-85 FROM N OF SR 63/BANKS TO 0.50 MI S OF SR 17/FRANKLIN Length: 17.77

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 50,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $45,000

State $5,000

Other $0

Total $50,000

Also in Franklin County

Project: M004810 Type Work: Resurface & Maintenance
Descp:SR 15/US 441 FROM JACKSON COUNTY LINE TO CR 18/FAULKNER ROAD Length: 1.30

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 432,120 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $345,696

State $86,424

Other $0

Total $432,120

Project: M004811 Type Work: Resurface & Maintenance
Descp:SR 15/US 441 FROM CR 18/FAULKNER ROAD TO SR 164 Length: 2.90

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,204,950 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $963,960

State $240,990

Other $0

Total $1,204,950

116

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Banks Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007023 0007023 0007156 0007156 0007156 0007157 0007157 0007158 0007158 0007158

Year
2016 2017 2015 2017 2017 2016 2017 2015 2016 2016

Phase
ROW CST ROW CST UTL ROW CST ROW CST UTL

Fund
STP STP STP STP STP STP STP STP STP STP

Federal
$86,561 $1,210,071
$252,960 $1,301,090
$86,913 $86,561 $1,457,236 $61,200 $1,787,641 $30,563

State
$21,640 $302,518
$63,240 $325,273
$21,728 $21,640 $364,309 $15,300 $446,910
$7,641

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total
$108,202 $1,512,588
$316,200 $1,626,363
$108,641 $108,202 $1,821,545
$76,500 $2,234,551
$38,203

$6,360,795

$1,590,199

$0

$7,950,994

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

117

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Barrow

Project: 0008430 Type Work: Interchange Descp:SR 316/US 29 @ SR 11
Length: 1.76

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2016 After 2018 After 2018

Federal $2,362,956 $9,906,565
$111,291

State $590,739 $2,476,641
$27,823

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,476,016 $0 12

Project Details: Grade separating intersection of SR316 & SR11- reduce crash frequency - improve safety- improve
traffic operations

Project: T004075 Type Work: Transit Projects
Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 46,312 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2015

Federal $37,050

State $0

Other $0 $0 $0

Total $2,953,696 $12,383,206
$139,114

Other $9,262

Total $46,312

Project: T004393 Type Work: Transit Projects
Descp:FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 50,000 $0 0

Phase Fund CST Transit

Year 2016

Federal $40,000

State $0

Other $10,000

Total $50,000

Project: T004859 Type Work: Transit Projects
Descp:FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 60,000 $0 0

Phase Fund CST Transit

Year 2017

Federal $48,000

State $0

Other $12,000

Total $60,000

118

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project PI#
0008430 T004075 T004393 T004859

Year
2016 2015 2016 2017

Barrow Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

ROW CST CST CST

NHPP Transit Transit Transit

$2,362,956 $37,050 $40,000 $48,000

$590,739 $0 $0 $0

$0 $9,262 $10,000 $12,000

Total
$2,953,696 $46,312 $50,000 $60,000

$2,488,006

$590,739

$31,262

$3,110,008

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

119

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Bartow

Project: 0004915 Type Work: Widening
Descp:SR 140 FM SR 53/FLOYD TO 0.3 MI W OF OOTHKALOOGA CRK/BARTOW
Lanes: Exist. 2 Prop. 4 Length: 6.20

Phase CST UTL

Fund STP STP

Year 2016 2016

Federal $25,037,592
$7,610,984

State $6,259,398 $1,902,746

Other $0 $0

Total $31,296,990
$9,513,730

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 40,810,720 $0 156

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development

Also in Floyd County

Project: 0007456 Type Work: Pedestrian Crossings
Descp:SR 2 @ 2 LOC; SR 3 @ 9 LOC; SR 5 @ 1 LOC IN BARTOW & FANNIN Length: 4.80

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 585,830 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $158,174 $369,073

State $17,575 $41,008

Other $0 $0

Total $175,749 $410,081

Also in Fannin County

Project: 0007494 Type Work: Widening
Descp:CS 1054/DOUTHIT FERRY RD FM OLD ALABAMA RD TO SR 61/SR 113
Lanes: Exist. 2 Prop. 4 Length: 2.42

Phase ROW CST UTL

Fund Local STP Local

Year

Federal

2015

$0

After 2018 $10,133,710

After 2018

$0

State $0
$2,533,428 $0

Other $3,802,560
$0 $905,346

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 17,375,044 $0 40

Project Details: Widen from 2 to 4 lanes with raised median - Provide additional capacity - reduce congestion -
improve mobility-reduce crash frequency-enhance economic development

Total $3,802,560 $12,667,138
$905,346

Project: 0007836 Type Work: Widening Descp:SR 20 FROM I-75/BARTOW TO I-575/CHEROKEE

Lanes: Exist. 2 Prop. 4 Length: 19.41

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 346,626,341 $0 0

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year

Federal

2017

$5,860,103

After 2018 $46,086,227

After 2018 $193,258,038

After 2018 $32,096,705

State $1,465,026 $11,521,557 $48,314,509 $8,024,176

Other $0 $0 $0 $0

Total $7,325,129 $57,607,783 $241,572,547 $40,120,881

Project Details: provide additional capacity- improve mobility and reduce congestion- enhance economic
development- reduce crash frequency.

Also in Cherokee County

120

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0008067 Type Work: TE-Bike/Ped Facility Descp:LEAKE MOUNDS-ETOWAH RIVERWALK LINK
Length: 1.85

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 938,000 $0 3

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $750,400

State $0

Other $187,600

Total $938,000

Project: 0008382 Type Work: Widening
Descp:SR 113 FM OLD ALA RD RELOC TO SR 61 @ NEW ALIGNMENT - PH I
Lanes: Exist. 2 Prop. 4 Length: 1.10

Phase PE CST UTL

Fund STP STP STP

Year 2015 2018 2018

Federal $48,000
$3,380,951 $372,775

State $12,000 $845,238 $93,194

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,752,157 $0 33

Project Details: Widen 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development

Project: 0009860 Type Work: Replace Bridge
Descp:SR 3 @ CR 122/OLD HWY 41 APPROX 4 MI S OF ADAIRSVILLE Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,161,748 $0 9

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Federal $277,612
$2,156,532 $95,254

State $69,403 $539,133 $23,814

Other $0 $0 $0
Other $0 $0 $0

Total $60,000
$4,226,188 $465,969
Total $347,015 $2,695,665 $119,068

Project: 0010700 Type Work: TE-Bike/Ped Facility Descp:PETTIT CREEK TRAIL - PHASE III
Length: 8.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,075,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $860,000

State $0

Other $215,000

Total $1,075,000

Project: 0010701 Type Work: TE-Bike/Ped Facility
Descp:RAILROAD ST @ 1 LOC; MAIN ST @ 1 LOC; & CHESTNUT ST @ 1 LOC Length: 0.35

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 540,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $432,000

State $0

Other $108,000

Total $540,000

121

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012791 Type Work: RRX Warning Device
Descp:CS 551/KING STREET @ CSX #340490G IN ADAIRSVILLE Length: 0.20

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 226,089 $ 26,089 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $26,089
$200,000

State $0 $0

Other $0 $0

Total $26,089
$200,000

Project: 0012792 Type Work: RRX Consolidation
Descp:CS 524/PARK STREET @ CSX #340489M IN ADAIRSVILLE Length: 0.20

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $3,000 $7,500

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 10,500 $0 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018

State $0 $0

Other $0 $0

Total $3,000 $7,500

Project: 0013176 Type Work: RRX Warning Device
Descp:CS 759/CARTER STREET @ CSX #340445M IN CARTERSVILLE Length: 0.40

Phase PE CST

Fund STP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 223,935 $ 23,935 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $23,935
$200,000

State $0 $0

Other $0 $0

Total $23,935
$200,000

Project: 0013238 Type Work: Preliminary Engineering
Descp:ROME-CARTERSVILLE DEVELOPMENT CORRIDOR - SCOPING Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Phase SCP

Fund STP

Year 2015

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 621410- Type Work: Widening
Descp:SR 113/OLD ALA RD RELOC FM SR 113 -PUMPKINVINE CK- TO CR 699
Lanes: Exist. 2 Prop. 4 Length: 5.35

Phase CST UTL

Fund STP STP

Year 2018 2018

Federal $36,942,384
$1,852,258

State $9,235,596
$463,064

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 48,493,302 $0 106

Project Details: Relocation and widening from 2 to 4 lanes - Provide additional capacity - reduce congestion -
improve mobility-reduce crash frequency-enhance economic development

Other $0 $0

Total $46,177,980
$2,315,322

122

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 621500- Type Work: Widening
Descp:SR 140 FM 0.3 MI W OF OOTHKALOOGA CRK TO SR 3/US 41
Lanes: Exist. 2 Prop. 4 Length: 1.00

Phase CST UTL

Fund STP STP

Year 2015 2015

Federal $2,820,828
$689,520

State $705,207 $172,380

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,387,935 $0 34

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development

Project: 621505- Type Work: Replace Bridge Descp:SR 140 @ OOTHKALOOGA CRK & CSX RR

Lanes: Exist. 2 Prop. 5 Length: 0.80

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,980,537 $0 0

Phase CST UTL

Fund STP STP

Year 2015 2015

Federal $3,069,570
$114,860

State $767,392
$28,715

Other $0 $0
Other $0 $0

Total $3,526,035
$861,900
Total $3,836,962
$143,575

Project: 661950- Type Work: New Construction
Descp:US 411 RELOC FM SR 3/US 41 TO I-75; INCL I-75 INTERCHANGE
Lanes: Exist. 0 Prop. 4 Length: 7.31

Phase PE
ROW ROW

Fund STP STP HPP

Year 2014 2017 2017

Federal $80,000
$10,272,779 $3,644,028

State $20,000 $2,568,195 $911,007

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 220,740,695 $ 100,000 71

ROW ROW ROW CST

HPP HPP HPP STP

2017 $12,243,936

2017

$855,472

2017

$2,874,388

After 2018 $139,423,464

$3,060,984 $213,868 $0
$34,855,866

UTL

STP After 2018 $5,581,349 $1,395,337

Project Details: New location of a 4 lane road - Improve mobility & connectivity enhance economic development
opportunities - State Freight Network

Other $0 $0
$375,481 $1,261,618
$88,148 $1,014,775
$0 $0

Total $100,000 $12,840,974 $4,930,516 $16,566,537 $1,157,488 $3,889,163 $174,279,330 $6,976,687

Project: M004835 Type Work: Resurface & Maintenance
Descp:SR 3 FROM CS 841/MLK JR BLVD TO N OF SR 293 CONNECTOR Length: 6.20

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,606,540 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,885,232

State $721,308

Other $0

Total $3,606,540

Project: M004836 Type Work: Resurface & Maintenance Descp:SR 113 FROM SR 3 TO I-75
Length: 2.13

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 767,007 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $613,606

State $153,401

Other $0

Total $767,007

123

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005109 Type Work: Bridges Descp:I-59 @ 2 LOCS & I-75 @ 4 LOCS
Length: 2.40

Phase PE CST

Fund NHPP NHPP

Year 2014 LUMP

Federal $20,970
$1,485,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,673,300 $ 23,300 0

Project Details: Painting bridge superstructure - on State Freight Network
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $2,330
$165,000

Other $0 $0

Total $23,300
$1,650,000

Also in Dade, Gordon County

Project: M005231 Type Work: Bridges
Descp:SR 1 @ 6 LOCS; SR 20 @ 6 LOCS & SR 61 @ 1 LOC - BRIDGE REHAB Length: 0.00

Phase PE CST

Fund NHPP NHPP

Year 2014 LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,220,000 $ 220,000 0

Project Details: Preservation and rehab on State Freight Network on GRIP Network
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Federal $176,000 $800,000

State $44,000 $200,000

Other $0 $0

Total $220,000 $1,000,000

Also in Floyd County

Project: T004076 Type Work: Transit Projects
Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 40,810 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2015

Federal $32,648

State $0

Other $8,162

Total $40,810

Project: T004394 Type Work: Transit Projects
Descp:FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 43,750 $0 0

Phase Fund CST Transit

Year 2016

Federal $35,000

State $0

Other $8,750

Total $43,750

Project: T004858 Type Work: Transit Projects
Descp:FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 52,500 $0 0

Phase Fund CST Transit

Year 2017

Federal $42,000

State $0

Other $10,500

Total $52,500

124

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project PI#

Bartow Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Year

Phase

Fund

Federal

State

Other

Total

0004915 0004915 0007494 0007836 0008382 0008382 0008382 0009860 0009860 0009860 0013238 621410621410621500621500621505621505661950661950661950661950661950T004076 T004394 T004858

2016 2016 2015 2017 2015 2018 2018 2015 2016 2016 2015 2018 2018 2015 2015 2015 2015 2017 2017 2017 2017 2017 2015 2016 2017

CST UTL ROW PE PE CST UTL ROW CST UTL SCP CST UTL CST UTL CST UTL ROW ROW ROW ROW ROW CST CST CST

STP STP Local NHPP STP STP STP STP STP STP STP STP STP STP STP STP STP HPP HPP HPP HPP STP Transit Transit Transit

$17,275,939 $5,251,579 $0 $2,051,036 $48,000 $3,380,951 $372,775 $277,612 $2,156,532 $95,254 $800,000
$36,942,384 $1,852,258 $2,820,828 $689,520 $3,069,570 $114,860 $2,874,388 $855,472
$12,243,936 $3,644,028
$10,272,779 $32,648 $35,000 $42,000

$4,318,985 $1,312,895
$0 $512,759
$12,000 $845,238
$93,194 $69,403 $539,133 $23,814 $200,000 $9,235,596 $463,064 $705,207 $172,380 $767,392 $28,715
$0 $213,868 $3,060,984 $911,007 $2,568,195
$0 $0 $0

$0 $0 $3,802,560 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,014,775 $88,148 $1,261,618 $375,481 $0 $8,162 $8,750 $10,500

$21,594,923 $6,564,474 $3,802,560 $2,563,795 $60,000 $4,226,188 $465,969 $347,015 $2,695,665 $119,068 $1,000,000
$46,177,980 $2,315,322 $3,526,035 $861,900 $3,836,962 $143,575 $3,889,163 $1,157,488
$16,566,537 $4,930,516
$12,840,974 $40,810 $43,750 $52,500

$107,199,348

$26,053,828

$6,569,993

$139,823,169

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

125

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Ben Hill

Project: 0000313 Type Work: Widening
Descp:SR 107 FROM W OF CR 264/IRWIN TO SR 11/US 129/BEN HILL
Lanes: Exist. 2 Prop. 4 Length: 10.45

Phase ROW CST UTL

Fund STP STP STP

Year

Federal

2018

$7,615,508

After 2018 $28,293,802

After 2018 $1,882,439

State $1,903,877 $7,073,451
$470,610

Other $0 $0 $0

Total $9,519,385 $35,367,253 $2,353,049

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 47,239,687 $0 120

Project Details: Widen from 2 to 4 lanes- improve mobility and reduce congestion- enhance economic development-
reduce crash frequency

Also in Irwin County

Project: 0006529 Type Work: TE-Bike/Ped Facility Descp:JEFFERSON DAVIS HERITAGE TRAIL
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 416,250 $0 11

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $333,000

State $0

Other $83,250

Total $416,250

Project: 0007627 Type Work: Historic Preservation
Descp:PRESERVATION OF 1906 AB&A RAILROAD BUILDING IN FITZGERALD Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 618,683 $ 56,244 0

Phase PE CST

Fund Local HPP

Year LOCL 2015

Federal $0
$449,951

State $0 $0

Other $56,244 $112,488

Total $56,244
$562,439

Project: 0011676 Type Work: Replace Bridge Descp:SR 11 @ HOUSE CREEK 9.5 MI N OF FITZGERALD
Length: 0.85

Phase ROW CST UTL

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,939,441 $0 3

Fund STP STP STP

Year 2016 2018 2018

Federal $125,680
$2,183,238 $42,635

State $31,420 $545,809 $10,659

Other $0 $0 $0

Total $157,100 $2,729,047
$53,294

Project: 0013261 Type Work: RRX Warning Device Descp:CR 152/LILAC ROAD @ CSX #638280V
Length: 0.40

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 225,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $25,000
$200,000

State $0 $0

Other $0 $0

Total $25,000
$200,000

126

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004829 Type Work: Resurface & Maintenance
Descp:SR 11 FROM CS 629/BUSH AVE TO WILCOX COUNTY LINE Length: 9.05

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,271,360 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,017,088

State $254,272

Other $0

Total $1,271,360

Project: M004860 Type Work: Resurface & Maintenance
Descp:SR 206 FROM N OF BROXTON HWY/BEN HILL TO N OF SR 32/COFFEE Length: 16.35

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,722,636 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,378,109

State $344,527

Other $0

Total $1,722,636

Also in Coffee, Irwin County

Project: M005182 Type Work: Resurface & Maintenance
Descp:SR 11 FROM SR 32/IRWIN TO CS 629/BUSH AVE/BEN HILL Length: 10.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,400,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,720,000

State $680,000

Other $0

Total $3,400,000

Also in Irwin County

Ben Hill Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000313 0007627 0011676 0011676 0011676

Year
2018 2015 2016 2018 2018

Phase
ROW CST ROW CST UTL

Fund
STP HPP STP STP STP

Federal
$4,797,770 $449,951 $125,680
$2,183,238 $42,635

State
$1,199,442 $0
$31,420 $545,809
$10,659

Other
$0 $112,488
$0 $0 $0

Total
$5,997,212 $562,439 $157,100
$2,729,047 $53,294

$7,599,274

$1,787,331

$112,488

$9,499,092

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

127

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Berrien

Project: 0010576 Type Work: TE-Bike/Ped Facility
Descp:SR 11; SR 76; S JEFFERSON & E WASHINGTON @ 4 LOCS - PH III Length: 0.70

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $200,000

State $0

Other $50,000

Project: 0010577 Type Work: TE-Bike/Ped Facility Descp:SR 37 FROM BAY STREET TO SR 125
Length: 0.25

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 187,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $150,000

State $0

Other $37,500

Project: 0010578 Type Work: TE-Bike/Ped Facility
Descp:SR 520 @ 1 LOC & CR 357/MAIN ST @ 2 LOCS IN ENIGMA Length: 0.47

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $200,000

State $0

Other $50,000

Project: 0010936 Type Work: TE-Bike/Ped Facility
Descp:CR 356/DOGWOOD STREET FROM SR 125 TO SR 76 Length: 1.01

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 437,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $350,000

State $0

Other $87,500

Total $250,000
Total $187,500
Total $250,000
Total $437,500

128

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004977 Type Work: Resurface & Maintenance
Descp:SR 125 FROM SR 11 TO 0.09 MI N OF CR 357/ENIGMA RD Length: 0.68

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 107,467 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $85,974

State $21,493

Other $0

Total $107,467

Project: M005082 Type Work: Resurface & Maintenance
Descp:SR 520 FM TIFT COUNTY LINE TO W OF WILLACOOCHEE CITY LIMITS Length: 18.66

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,224,636 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $4,979,709

State $1,244,927

Other $0

Total $6,224,636

Also in Atkinson County

Project: M005181 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 37 TO SR 76/SR 125
Length: 10.01

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,526,755 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $3,621,404

State $905,351

Other $0

Total $4,526,755

129

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Bleckley

Project: 0003625 Type Work: Widening
Descp:SR 87 FM 0.2 MI N OF CR 141/FOSKEY RD TO CR 166/DYKES CIRCLE
Lanes: Exist. 2 Prop. 4 Length: 4.40

Phase PE
ROW CST

Fund STP STP STP

Year 2014 2014 2018

Federal $164,000
$1,768,000 $10,298,262

State $41,000 $442,000 $2,574,565

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,287,827 $ 2,415,000 82

Project Details: Widen by 2 additional lanes- provide additional capacity to improve mobility and reduce congestion-
enhance economic development and will reduce crash frequency on SR 87 in Bleckley County.

Other $0 $0 $0

Total $205,000 $2,210,000 $12,872,827

Project: 222410- Type Work: Widening
Descp:SR 87/US 23 FM LOG CABIN/DODGE TO S OF SR 257/BLECKLEY-TIA
Lanes: Exist. 2 Prop. 4 Length: 9.50

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 31,613,029 $ 6,906,751 220

Phase PE CST CST UTL

Fund STP State STP Local

Year 2014 2014 2017 2017

Federal $120,000 $0
$19,178,027 $0

State $30,000
$0 $4,794,507
$0

Other $0
$6,756,751 $0
$733,745

Total $150,000 $6,756,751 $23,972,534 $733,745

Project Details: Widen from 2 to 4 lanes - provide additional capacity to improve mobility and reduce congestion -
enhance economic development and will reduce crash frequency on SR 87 in Dodge and Bleckley
county.

Also in Dodge County

Project: M004189 Type Work: Signing
Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,700,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Project: M004852 Type Work: Resurface & Maintenance
Descp:SR 26 FROM N OF CR 18/BARLOW ROAD TO SR 87BU Length: 3.44

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 791,002 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,700,000
Federal $632,802

State $0

Other $0

Total $1,700,000

Also in Emanuel, Laurens, Treutlen County

State $158,200

Other $0

Total $791,002

130

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004853 Type Work: Resurface & Maintenance Descp:SR 112 FROM SR 87 TO TWIGGS COUNTY LINE
Length: 12.75

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,540,904 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,032,723

State $508,181

Other $0

Total $2,540,904

Project: M004854 Type Work: Resurface & Maintenance Descp:SR 126 FROM SR 26 TO GUM SWAMP CREEK
Length: 5.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 993,352 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $794,681

State $198,670

Other $0

Total $993,352

Bleckley Totals Summary
County Summary excludes lump sum projects.

Project PI#
0003625 222410222410-

Year
2018 2017 2017

Phase
CST CST UTL

Fund
STP STP Local

Federal
$10,298,262 $3,068,484 $0

State
$2,574,565 $767,121 $0

Other
$0 $0 $117,399

Total
$12,872,827 $3,835,605 $117,399

$13,366,746

$3,341,687

$117,399

$16,825,832

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

131

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Brantley

Project: 0007161 Type Work: Replace Bridge
Descp:SR 32 @ LITTLE SATILLA RIVER OVERFLOW 6 MI SE OF PATTERSON Length: 0.25

Phase PE CST

Fund NHPP NHPP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,230,825 $0 0

Year 2016 2016

Federal $8,000
$976,660

State $2,000
$244,165

Other $0 $0

Total $10,000
$1,220,825

Project: M004596 Type Work: Resurface & Maintenance
Descp:SR 520 FM .20 MI W OF CR 184/PALOMA ST TO .02 MI W OF SR 110 Length: 6.58

Phase CST

Fund STP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,651,010 $ 2,651,010 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,120,808

State $530,202

Other $0

Total $2,651,010

Project: M004601 Type Work: Resurface & Maintenance
Descp:SR 520 FM CR 229/OLD POST RD/BRANTLEY TO COLLEGE CREEK/GLYNN Length: 6.70

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,473,476 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,978,781

State $494,695

Other $0

Total $2,473,476

Also in Glynn County

Project: M004833 Type Work: Resurface & Maintenance
Descp:SR 520 FROM E OF CR 278/GALLBERRY RD TO CR 168/BROWNTOWN RD Length: 2.90

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,024,950 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $819,960

State $204,990

Other $0

Total $1,024,950

Project: M004834 Type Work: Resurface & Maintenance
Descp:SR 520 FROM NAHUNTA CITY LIMITS TO E OF CS 528/MORGAN CIRCLE Length: 1.90

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 842,075 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $673,660

State $168,415

Other $0

Total $842,075

132

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Brantley Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0007161 0007161

2016

PE

2016

CST

NHPP NHPP

$8,000 $976,660

$2,000 $244,165

$0

$10,000

$0

$1,220,825

$984,660

$246,165

$0

$1,230,825

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

133

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Brooks

Project: 0000545 Type Work: Widening
Descp:SR 133 FM CR 1/OLD QUITMAN ADEL RD/BROOKS TO CR 256/COLQUITT
Lanes: Exist. 2 Prop. 4 Length: 9.63

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 2016 2016

Federal $1,072,800 $23,623,347
$355,504

State $268,200 $5,905,837
$88,876

Other $0 $0 $0

Total $1,341,000 $29,529,183
$444,380

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 31,314,563 $ 1,341,000 105

Project Details: widen from 2 to 4 lanes- turn lanes added as needed- improve mobility-reduce congestion-enhance
economic development- reduce crash frequency- GRIP

Also in Colquitt County

Project: 0010855 Type Work: Signals
Descp:SR 35 @ 5 LOC; SR 38 @ 3 LOC &SR 133 @ 1 LOC-SIGNAL UPGRADES Length: 3.60

Phase ROW CST

Fund STP STP

Year LUMP LUMP

Federal $156,000
$1,283,050

State $0 $0

Other $0 $0

Total $156,000 $1,283,050

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,439,050 $0 3

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Also in Colquitt County

Project: 0011723 Type Work: RRX Warning Device
Descp:MLK JR DR @ CSX #643305Y; INC 3 CLOSURES IN QUITMAN Length: 1.75

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 275,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $25,000
$250,000

State $0 $0

Other $0 $0

Total $25,000
$250,000

Project: M005163 Type Work: Resurface & Maintenance Descp:SR 76 FROM FLORIDA STATE LINE TO SR 333
Length: 9.90

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,130,003 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $904,002

State $226,001

Other $0

Total $1,130,003

134

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005192 Type Work: Resurface & Maintenance Descp:SR 76 FROM SR 333 TO COOK COUNTY LINE
Length: 18.34

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,309,663 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $5,847,730

State $1,461,933

Other $0

Total $7,309,663

Brooks Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000545 0000545

Year
2016 2016

Phase
CST UTL

Fund
NHPP NHPP

Federal
$18,189,977 $273,738

State
$4,547,494 $68,434

Other
$0 $0

Total
$22,737,471 $342,172

$18,463,715

$4,615,929

$0

$23,079,643

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

135

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Bryan

Project: 0010739 Type Work: Operational Improvement Descp:SR 144 @ I-95 SB & NB OFF RAMPS
Length: 0.40

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 800,000 $0 0

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2015 - FY 2018

Year LUMP

Federal $640,000

State $160,000

Other $0

Total $800,000

Project: 0010913 Type Work: Slope Repair
Descp:SR 144 SPUR @OGEECHEE RIVER-INSTALL RIP RAP SCOUR PROTECTION Length: 0.28

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,612,065 $0 0

Phase ROW CST

Fund STP STP

Year 2017 2018

Federal $119,241
$4,370,411

State $29,810 $1,092,603

Other $0 $0

Total $149,051 $5,463,014

Project: 0012659 Type Work: Interchange
Descp:I-95 @ CR 90/BELFAST SIDING ROAD - NEW INTERCHANGE
Lanes: Exist. 0 Prop. 6 Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,046,949 $ 1,894,000 0

Phase PE PE
ROW CST

Fund Local Local Local STP

Year 2014 2014 2016 2018

Federal $0 $0 $0
$6,922,359

State $0 $0 $0
$1,730,590

Other $1,800,000
$94,000 $1,500,000
$0

Project Details: Interchange- 0 to 4 lanes- bike/ped improvements- improve mobility and connectivity-enhance
economic development- State Freight Corridor

Project: 0012830 Type Work: Operational Improvement Descp:I-95 @ SR 25/US 17 - SB RAMPS
Length: 0.40

Phase PE CST

Fund STP STP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 415,000 $ 125,000 0

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $100,000 $232,000

State $25,000 $58,000

Other $0 $0

Total $1,800,000
$94,000 $1,500,000 $8,652,949
Total $125,000 $290,000

Project: 0012843 Type Work: Signals
Descp:SR 25 @ 4 LOC; SR 26 @ 5 LOC &SR 204 @ 1 LOC-SIGNAL UPGRADES Length: 4.00

Phase PE
ROW CST

Fund STP STP STP

Year 2014 LUMP LUMP

Federal $250,000 $225,000
$1,000,000

State $0 $0 $0

Other $0 $0 $0

Total $250,000 $225,000 $1,000,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,475,000 $ 250,000 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Also in Chatham County

136

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 532370- Type Work: Widening Descp:SR 144 EB FROM S OF CR 100 TO S OF CR 154

Lanes: Exist. 2 Prop. 4 Length: 5.05

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 27,453,270 $ 11,386,346 98

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2014 2017 2017

Federal $381,077
$8,728,000 $12,052,539
$801,000

State $95,269 $2,182,000 $3,013,135 $200,250

Project Details: Widen from 2 to 4 lanes- improve mobility and reduce congestion-enhance economic development-
reduce crash frequency- incorporate bike lanes and sidewalks-

Project: M003079 Type Work: Bridges Descp:I-95 @ CSX RR - BRIDGE REHAB
Length: 0.40

Phase CST

Fund NHPP

Year LUMP

Federal $632,696

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 702,996 $0 0

Project Details: Maintenance- improve safety- State Freight Corridor
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $70,300

Other $0 $0 $0 $0

Total $476,346 $10,910,000 $15,065,674 $1,001,250

Other $0

Total $702,996

Project: M004591 Type Work: Resurface & Maintenance
Descp:SR 144 FM FORT STEWART ENTRANCE/BRYAN TO TRINITY RD/LIBERTY Length: 11.62

Phase CST

Fund NHPP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,231,620 $ 2,231,620 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,785,296

State $446,324

Other $0

Total $2,231,620

Also in Liberty County

Project: M004599 Type Work: Resurface & Maintenance
Descp:SR 67 FROM SR 30/US 280 TO BULLOCH COUNTY LINE Length: 4.20

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 561,427 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $449,142

State $112,285

Other $0

Total $561,427

137

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004865 Type Work: Resurface & Maintenance Descp:SR 144 FROM I-95 TO SR 25/US 17
Length: 3.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,224,331 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $979,464

State $244,866

Other $0

Total $1,224,331

Project: M004866 Type Work: Resurface & Maintenance
Descp:SR 30/US 280 FROM CS 513/N POPLAR ST TO CS 503/WARNELL ST Length: 0.69

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 238,914 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $191,132

State $47,783

Other $0

Total $238,914

Project: M004867 Type Work: Resurface & Maintenance
Descp:SR 144 FM RICHMOND HILL CITY LIMITS TO S OF CR 230/BROWN RD Length: 12.44

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,412,082 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,929,665

State $482,416

Other $0

Total $2,412,082

Project: M004995 Type Work: Bridges Descp:I-16 EB & WB @ BLACK CREEK - SCOUR REPAIR
Length: 0.80

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Federal $157,500 $585,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 825,000 $0 0

Project Details: Maintenance- improve safety- State Freight Corridor
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $17,500 $65,000

Other $0 $0

Total $175,000 $650,000

138

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005053 Type Work: Resurface & Maintenance Descp:SR 119 FROM I-16 TO CS 586/PAYNE DRIVE
Length: 6.63

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,523,846 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,219,077

State $304,769

Other $0

Total $1,523,846

Also in Bulloch County

Bryan Totals Summary
County Summary excludes lump sum projects.

Project PI#
0010913 0010913 0012659 0012659 532370532370-

Year
2017 2018 2016 2018 2017 2017

Phase
ROW CST ROW CST CST UTL

Fund
STP STP Local STP STP STP

Federal
$119,241 $4,370,411
$0 $6,922,359 $12,052,539
$801,000

State
$29,810 $1,092,603
$0 $1,730,590 $3,013,135
$200,250

Other
$0 $0 $1,500,000 $0 $0 $0

Total
$149,051 $5,463,014 $1,500,000 $8,652,949 $15,065,674 $1,001,250

$24,265,550

$6,066,388

$1,500,000

$31,831,938

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

139

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Bulloch

Project: 0005829 Type Work: Passing Lanes
Descp:SR 26 FROM CR 491/AMANDA ROAD TO CR 423/OLD LEE FIELD ROAD Length: 3.10

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,965,557 $ 150,000 43

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2016 2018 2018

Federal $120,000 $961,879
$2,625,587 $264,979

State $30,000 $240,470 $656,397 $66,245

Project Details: Improve passing opportunities- address operational and safety issues -constructing passing lanes
and turn lanes along a 2 lane undivided section of US 80/SR 26 in Bulloch County.

Project: 0010364 Type Work: Intersection Improvement Descp:SR 26 @ CR 585/BURKHALTER ROAD
Length: 0.47

Phase ROW CST

Fund HSIP HSIP

Year 2014 LUMP

Federal $459,000 $716,631

State $51,000 $79,626

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,306,257 $ 510,000 6

Project Details: Will improve the capacity and operations of the intersection to enhance mobility- exisiting
intersection is a two way - proposed project will convert into a roundabout on SR 26 in Bulloch
County
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Other $0 $0 $0 $0
Other $0 $0

Total $150,000 $1,202,349 $3,281,984 $331,224
Total $510,000 $796,257

Project: 0010428 Type Work: Intersection Improvement
Descp:CR 248/LANGSTON CHAPEL ROAD @ CR 585/HARVILLE ROAD Length: 0.20

Phase PE CST

Fund Safety Safety

Year LUMP LUMP

Federal $90,000
$675,000

State $10,000 $75,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 850,000 $0 0

Project Details: Will improve the capacity and operations of the intersection to enhance mobility on CR 248 in
Bulloch County
Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018

Other $0 $0

Total $100,000 $750,000

Project: 0011765 Type Work: RRX Warning Device
Descp:CS 699/ZETTEROWER AVE @ GSFR #620181T IN STATESBORO Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 265,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $265,000

State $0

Other $0

Total $265,000

140

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 522460- Type Work: Widening Descp:SR 67 FM I-16 TO STATESBORO BYPASS Lanes: Exist. 2 Prop. 4 Length: 10.86

Phase ROW CST UTL

Fund STP STP STP

Year 2016 2018 2018

Federal $5,999,363 $23,790,189
$644,708

State $1,499,841 $5,947,547
$161,177

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 38,042,824 $0 77

Project Details: Widen 2 to 4 lane- provide additional capacity to improve mobility and reduce congestio between
Statesboro and I-16- enhance economic development and will reduce crash frequency.

Project: M004594 Type Work: Resurface & Maintenance
Descp:SR 67 FROM 0.46 MI S OF CR 585/HARVILLE ROAD TO SR 73 Length: 3.33

Phase CST

Fund STP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,626,637 $ 2,626,637 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,101,310

State $525,327

Other $0 $0 $0

Total $7,499,203 $29,737,736
$805,885

Other $0

Total $2,626,637

Project: M004598 Type Work: Resurface & Maintenance
Descp:SR 26/SR 67 FROM MILL CREEK TO CS 619/NORTH COLLEGE STREET Length: 6.78

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,015,146 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,412,117

State $603,029

Other $0

Total $3,015,146

Project: M004868 Type Work: Resurface & Maintenance
Descp:SR 26 FROM CS 720/CARMEL DRIVE TO CR 491/AMANDA ROAD Length: 2.70

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 972,263 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $777,810

State $194,453

Other $0

Total $972,263

Project: M005053 Type Work: Resurface & Maintenance Descp:SR 119 FROM I-16 TO CS 586/PAYNE DRIVE
Length: 6.63

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,523,846 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,219,077

State $304,769

Other $0

Total $1,523,846

Also in Bryan County

141

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005079 Type Work: Resurface & Maintenance Descp:SR 24 FROM SR 26 TO CR 445/CLITO ROAD
Length: 6.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,440,418 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,152,334

State $288,084

Other $0

Total $1,440,418

Project: M005080 Type Work: Resurface & Maintenance
Descp:SR 73 FROM CLAXTON CITY LIMITS TO STATESBORO CITY LIMITS Length: 8.55

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,078,831 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,463,065

State $615,766

Other $0

Total $3,078,831

Also in Evans County

Project: M005096 Type Work: Resurface & Maintenance Descp:SR 119 CONN FROM SR 26 TO SR 119
Length: 5.98

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,118,110 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $894,488

State $223,622

Other $0

Total $1,118,110

Project: M005101 Type Work: Resurface & Maintenance
Descp:SR 26/US 80 FROM S OF CS 906/STOCKYARD ROAD TO SR 67 Length: 5.46

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 907,452 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $725,962

State $181,490

Other $0

Total $907,452

Project: M005143 Type Work: Resurface & Maintenance Descp:SR 67 FROM BRYAN COUNTY LINE TO I-16
Length: 5.80

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,204,950 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $963,960

State $240,990

Other $0

Total $1,204,950

142

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005185 Type Work: Resurface & Maintenance
Descp:SR 67 FROM I-16 TO 0.25 MI N OF CR 1197/SOUTHBEND DRIVE Length: 8.60

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,667,516 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,334,013

State $333,503

Other $0

Total $1,667,516

Bulloch Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005829 0005829 0005829 522460522460522460-

Year
2016 2018 2018 2016 2018 2018

Phase
ROW CST UTL ROW CST UTL

Fund
STP STP STP STP STP STP

Federal
$961,879 $2,625,587
$264,979 $5,999,363 $23,790,189
$644,708

State
$240,470 $656,397
$66,245 $1,499,841 $5,947,547
$161,177

Other
$0 $0 $0 $0 $0 $0

Total
$1,202,349 $3,281,984
$331,224 $7,499,203 $29,737,736
$805,885

$34,286,705

$8,571,676

$0

$42,858,381

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

143

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Burke

Project: 0013258 Type Work: Pedestrian Crossings
Descp:SR 4; SR 17 & SR 24 @ 4 LOCS - PEDESTRIAN UPGRADES Length: 1.60

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 636,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Project: M005037 Type Work: Resurface & Maintenance Descp:SR 56 FROM EMANUEL COUNTY LINE TO SR 24
Length: 21.90

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,691,910 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $122,400 $450,000
Federal $2,153,528

State $13,600 $50,000

Other $0 $0

Total $136,000 $500,000

Also in Jefferson, McDuffie County

State $538,382

Other $0

Total $2,691,910

Project: M005038 Type Work: Resurface & Maintenance Descp:SR 56 FROM SR 121 BYPASS TO SR 56 SPUR
Length: 11.19

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,571,991 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,257,593

State $314,398

Other $0

Total $1,571,991

Project: M005147 Type Work: Resurface & Maintenance Descp:SR 80 FROM SR 56 SPUR TO SR 56
Length: 8.80

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,618,795 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,295,036

State $323,759

Other $0

Total $1,618,795

144

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005148 Type Work: Resurface & Maintenance
Descp:SR 24 FM 0.08 MI W OF CS 543/CEMETERY ROAD TO SR 121 BYPASS Length: 14.90

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,197,688 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,558,150

State $639,538

Other $0

Total $3,197,688

145

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Butts

Project: 0000760 Type Work: Widening Descp:SR 16 WIDEN FM I-75 TO CITY OF JACKSON

Lanes: Exist. 2 Prop. 4 Length: 7.36

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 48,152,838 $0 0

Phase SCP PE ROW CST

Fund STP STP STP STP

Year

Federal

2015

$800,000

After 2018 $4,416,323

After 2018 $12,990,915

After 2018 $20,315,032

State $200,000 $1,104,081 $3,247,729 $5,078,758

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development

Project: 0007580 Type Work: Sidewalks
Descp:ROAD IMPROVEMENTS & UTILITY RELOCATIONS IN JACKSON Length: 0.00

Phase PE
ROW CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 674,438 $0 0

Fund Local Local HPP

Year 2016 2016 After 2018

Federal $0 $0
$449,950

State $0 $0 $0

Other $0 $0 $0 $0

Total $1,000,000 $5,520,404 $16,238,644 $25,393,790

Other $62,000 $50,000 $112,488

Total $62,000 $50,000
$562,438

Project: 0009966 Type Work: Roundabout Descp:SR 42 @ SR 87
Length: 0.30

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,320,067 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $400,000 $920,067

State $0 $0

Other $0 $0

Total $400,000 $920,067

Project: 333171- Type Work: Replace Bridge
Descp:SR 36 @ YELLOW WATER CREEK 1 MI N OF JCT SR 42 Length: 0.50

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,634,166 $0 15

Phase ROW CST UTL

Fund STP STP Local

Year 2018 After 2018 After 2018

Federal $58,114
$2,814,537 $0

State $14,529 $703,634
$0

Other $0 $0
$43,351

Total $72,643
$3,518,172 $43,351

Project: M004824 Type Work: Resurface & Maintenance Descp:SR 16 FROM SR 42 TO JASPER COUNTY LINE
Length: 7.39

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,167,916 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $934,333

State $233,583

Other $0

Total $1,167,916

146

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004855 Type Work: Resurface & Maintenance Descp:SR 42 FROM MONROE COUNTY LINE TO SR 16
Length: 8.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,162,967 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,730,374

State $432,593

Other $0

Total $2,162,967

Project: M004856 Type Work: Resurface & Maintenance Descp:SR 16 FROM SR 42 TO I-75
Length: 6.80

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,667,870 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,334,296

State $333,574

Other $0

Total $1,667,870

Butts Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000760 0007580 0007580 333171-

Year
2015 2016 2016 2018

Phase
SCP PE ROW ROW

Fund
STP Local Local STP

Federal
$800,000 $0 $0
$58,114

State
$200,000 $0 $0
$14,529

Other
$0 $62,000 $50,000
$0

Total
$1,000,000 $62,000 $50,000 $72,643

$858,114

$214,529

$112,000

$1,184,643

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

147

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Calhoun

Project: 0009862 Type Work: Replace Bridge Descp:SR 45 @ CORDRAYS POND DRAIN & OVERFLOW
Length: 0.46

Phase ROW CST

Fund Bridge STP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,537,966 $ 90,000 3

Year 2014 2016

Federal $72,000
$1,958,373

State $18,000 $489,593

Other $0 $0

Total $90,000
$2,447,966

Project: 0010597 Type Work: TE-Bike/Ped Facility
Descp:SR 37; SR 45; CS 555/COURT ST & CS 560/WHITNEY ST @ 4 LOCS Length: 0.32

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 266,324 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $213,059

State $0

Other $53,265

Total $266,324

Project: 0013149 Type Work: Signing
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 9 LOCS IN CALHOUN COUNTY Length: 18.49

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 77,025 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $77,025

State $0

Other $0

Total $77,025

Project: 442951- Type Work: Replace Bridge
Descp:SR 234 @ CHICKASAWHATCHEE CREEK 8 MI NE OF LEARY Length: 1.54

Phase ROW CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,422,597 $0 4

Fund STP STP

Year 2016 2017

Federal $291,312
$6,446,765

State $72,828 $1,611,691

Other $0 $0

Total $364,140 $8,058,457

Also in Dougherty County

Project: M005015 Type Work: Resurface & Maintenance Descp:SR 45 FROM SR 62 TO SR 37
Length: 11.59

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,424,622 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,139,698

State $284,924

Other $0

Total $1,424,622

148

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005164 Type Work: Resurface & Maintenance
Descp:SR 62 FROM SR 45 TO DOUGHERTY COUNTY LINE Length: 18.42

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,396,280 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,717,024

State $679,256

Other $0

Total $3,396,280

Project: M005206 Type Work: Resurface & Maintenance Descp:SR 37 FROM SR 1 TO BAKER COUNTY LINE
Length: 27.54

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,901,614 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,321,291

State $580,323

Other $0

Total $2,901,614

Also in Clay County

Calhoun Totals Summary
County Summary excludes lump sum projects.

Project PI#
0009862 442951442951-

Year
2016 2016 2017

Phase
CST ROW CST

Fund
STP STP STP

Federal
$1,958,373 $145,656
$3,223,383

State
$489,593 $36,414
$805,846

Other
$0 $0 $0

Total
$2,447,966 $182,070
$4,029,228

$5,327,411

$1,331,853

$0

$6,659,264

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

149

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Camden

Project: 0000820 Type Work: Widening
Descp:SR 40 FM E OF ST MARYS RIVER TRIB TO E OF CR 66/COLERAIN RD
Lanes: Exist. 2 Prop. 4 Length: 11.47

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 33,408,629 $0 64

Phase ROW ROW CST UTL

Fund HPP HPP NHPP NHPP

Year

Federal

2016

$1,812,278

2016

$711,507

After 2018 $23,920,474

After 2018 $282,645

State $453,069 $177,877 $5,980,119
$70,661

Other $0 $0 $0 $0

Total $2,265,347
$889,383 $29,900,593
$353,306

Project Details: Widen from 2 to 4 lanes-improve operation and mobility-enhance economic development-on GRIP
corridor

Also in Charlton County

Project: 0002861 Type Work: Turn Lanes
Descp:SR 40 FM W OF CS 481/GROVE BLVD TO E OF PR 718/TRUSS PLANT Length: 1.44

Phase CST

Fund NHPP

Year 2018

Federal $5,470,064

State $1,367,516

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,837,580 $0 19

Project Details: Add center turn lane-reduce congestion-improve operation and mobility-reduce crash
frequency-enhance economic development-on GRIP corridor

Project: 0007414 Type Work: Widening
Descp:CR 90/COLERAIN ROAD FM W OF I-95 TO E OF KINGS BAY ROAD
Lanes: Exist. 2 Prop. 4 Length: 5.85

Phase PE CST UTL

Fund STP STP STP

Year 2015 2017 2017

Federal $40,000
$19,746,022 $2,384,815

State $10,000 $4,936,505 $596,204

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 27,713,546 $0 94

Project Details: Widen from two to four lanes-improve operations and mobility-reduce crash frequency

Other $0

Total $6,837,580

Other $0 $0 $0

Total $50,000
$24,682,527 $2,981,018

Project: 0008666 Type Work: Widening
Descp:KINGSLAND BYPASS FROM CR 61/VACUNA ROAD TO W OF I-95
Lanes: Exist. 2 Prop. 4 Length: 4.85

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 22,463,791 $0 64

Phase ROW CST CST CST UTL

Fund HPP STP HPP HPP STP

Year 2016 2018 2018 2018 2018

Project Details: New alignment-improve operation and mobility-reduce crash frequency

Federal $2,127,200 $13,586,433 $1,497,356
$419,900 $340,143

State $531,800 $3,396,608 $374,339 $104,975
$85,036

Other $0 $0 $0 $0 $0

Total $2,659,000 $16,983,042 $1,871,695
$524,875 $425,179

150

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009436 Type Work: RRX Warning Device Descp:SR 40 SPUR @ SMR #861077N IN ST MARYS
Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 159,181 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $159,181

State $0

Other $0

Total $159,181

Project: 0010579 Type Work: TE-Bike/Ped Facility
Descp:SR 40 FROM CS 456/WEST STREET TO CS 457/EAST STREET Length: 0.46

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 7

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $200,000

State $0

Other $50,000

Total $250,000

Project: 0010580 Type Work: TE-Bike/Ped Facility
Descp:ST MARYS FM READY ST TO WATERFRONT-MULTI-USE TRAIL - PH III Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $200,000

State $0

Other $50,000

Total $250,000

Project: M004900 Type Work: Resurface & Maintenance
Descp:SR 40 FROM E OF CS 556//HENRIETTA ST TO CS 599/KINGS BAY RD Length: 4.17

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,220,529 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $976,423

State $244,106

Other $0

Total $1,220,529

Project: M004904 Type Work: Resurface & Maintenance
Descp:SR 40 FROM CS 432/JULIA STREET TO CS 416/CHURCH STREET Length: 1.94

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 806,070 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $644,856

State $161,214

Other $0

Total $806,070

151

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005054 Type Work: Resurface & Maintenance
Descp:SR 40 FROM CHARLTON COUNTY LINE TO E OF CS 556/HENRIETTA ST Length: 13.40

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,083,017 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $3,266,414

State $816,603

Other $0

Total $4,083,017

Project: M005112 Type Work: Bridges
Descp:I-95 SB & NB @ LITTLE SATILLA RIVER - BRIDGE REHAB Length: 0.80

Phase PE CST

Fund NHPP NHPP

Year 2014 LUMP

Federal $139,500 $900,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,155,000 $ 155,000 0

Project Details: Maintenance project-improves safety
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $15,500 $100,000

Other $0 $0

Total $155,000 $1,000,000

Also in Glynn County

Camden Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000820 0000820 0002861 0007414 0007414 0007414 0008666 0008666 0008666 0008666 0008666

Year
2016 2016 2018 2015 2017 2017 2016 2018 2018 2018 2018

Phase
ROW ROW CST
PE CST UTL ROW CST CST CST UTL

Fund
HPP HPP NHPP STP STP STP HPP HPP HPP STP STP

Federal
$619,011 $1,576,682 $5,470,064
$40,000 $19,746,022
$2,384,815 $2,127,200
$419,900 $1,497,356 $13,586,433
$340,143

State
$154,753 $394,170 $1,367,516
$10,000 $4,936,505
$596,204 $531,800 $104,975 $374,339 $3,396,608
$85,036

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total
$773,763 $1,970,852 $6,837,580
$50,000 $24,682,527
$2,981,018 $2,659,000
$524,875 $1,871,695 $16,983,042
$425,179

$47,807,626

$11,951,906

$0

$59,759,532

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

152

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Candler

Project: 0006495 Type Work: RRX Warning Device Descp:CS 587/MLK JR BLVD @ OGE RR #620236D
Length: 0.13

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 179,264 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $179,264

State $0

Other $0

Project: 0010818 Type Work: TE-Bike/Ped Facility
Descp:METTER DOWNTOWN STREETSCAPES @ 4 LOCS - PHASE III Length: 0.25

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 291,034 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $232,827

State $0

Other $58,207

Total $179,264
Total $291,034

153

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Carroll

Project: 0005827 Type Work: Intersection Improvement Descp:SR 166 @ HAYS MILL ROAD IN CARROLLTON
Length: 0.15

Phase CST

Fund NHPP

Year 2017

Federal $346,194

State $86,549

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 432,743 $0 8

Project Details: Intersection safety improvments- Intersection capacity & operational improvements- enhanced
mobility

Project: 0006026 Type Work: Intersection Improvement Descp:SR 5 @ SR 16/US 27 ALT

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,506,942 $ 95,000 0

Phase PE
ROW CST UTL

Fund HSIP HSIP HSIP HSIP

Year 2014 LUMP LUMP LUMP

Federal $85,500
$369,705 $571,103 $329,940

State $9,500
$41,078 $63,456 $36,660

Project Details: Intersection reconstruction including roundabout improve operation reduce crash frequency and
severity
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Other $0
Other $0 $0 $0 $0

Project: 0007640 Type Work: Multi-use Trail
Descp:CHATTAHOOCHEE HILLS REGIONAL GREENWAY TRAIL - CARROLL Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 562,437 $0 0

Fund HPP

Year 2016

Federal $449,950

State $0

Other $112,487

Total $432,743
Total $95,000
$410,783 $634,559 $366,600
Total $562,437

Project: 0010457 Type Work: TE-Bike/Ped Facility Descp:VILLA RICA TRAILHEAD
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 625,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $500,000

State $0

Other $125,000

Total $625,000

154

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0010493 Type Work: Signing
Descp:CR 392 FROM SR 61 TO CR 384 & CR 824 FROM SR 113 TO CR 753 Length: 2.82

Phase PE CST

Fund Safety Safety

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 45,000 $0 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $10,000 $35,000

State $0 $0

Other $0 $0

Total $10,000 $35,000

Project: 0010948 Type Work: TE-Bike/Ped Facility
Descp:CARROLTON GREENBELT FM SR 166 BYPASS TO E OF STRICKLAND RD Length: 1.42

Phase CST CST

Fund HPP STP

Year 2015 LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,182,150 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $251,972
$1,493,748

State $0 $0

Other $62,993 $373,437

Total $314,965 $1,867,185

Project: 631490- Type Work: New Construction
Descp:VILLA RICA BYP EXTEND W FM PROPOSED SR 61 BYPASS TO SR 101
Lanes: Exist. 0 Prop. 2 Length: 2.42

Phase ROW CST

Fund STP STP

Year 2016 2018

Federal $4,034,288 $4,946,902

State $1,008,572 $1,236,726

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 11,226,488 $0 48

Project Details: New location of a 2 lane bypass - Improve mobility & connectivity enhance economic development
opportunities

Project: 662540- Type Work: New Construction
Descp:SR 61 CONN FM SR 61 TO S OF SHORELINE PKWY
Lanes: Exist. 0 Prop. 2 Length: 1.10

Phase ROW CST

Fund STP STP

Year 2017 After 2018

Federal $3,931,411 $3,019,330

State $982,853 $754,833

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,688,427 $0 37

Project Details: New location of a 2 lane bypass - Improve mobility & connectivity enhance economic development
opportunities

Project: M003688 Type Work: Weigh Station
Descp:I-20 FM PLEASANT RIDGE RD TO LEVANS RD NEW WEIGH STATION Length: 1.72

Phase PE
ROW CST

Fund NHPP NHPP NHPP

Year

Federal

LUMP $1,241,594

LUMP

$253,387

After 2018 $31,190,194

State $137,955
$28,154 $3,465,577

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 36,316,860 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Other $0 $0

Total $5,042,860 $6,183,628

Other $0 $0

Total $4,914,264 $3,774,163

Other $0 $0 $0

Total $1,379,549
$281,541 $34,655,771

155

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004648 Type Work: Resurface & Maintenance
Descp:SR 1BU FROM N OF SR 1/CARROLL TO S OF SR 1/HARALSON Length: 4.74

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,125,960 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $900,768

State $225,192

Other $0

Total $1,125,960

Also in Haralson County

Project: M004837 Type Work: Resurface & Maintenance Descp:SR 166 FROM DOUGLAS COUNTY LINE TO SR 61

Phase CST

Length: 5.94

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,037,417 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $829,933

State $207,483

Other $0

Total $1,037,417

Project: M004838 Type Work: Resurface & Maintenance Descp:SR 1/US 27 FROM NS #719232F TO SR 166
Length: 3.25

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 945,263 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $756,210

State $189,053

Other $0

Total $945,263

Project: M004839 Type Work: Resurface & Maintenance
Descp:SR 8 FROM HARALSON COUNTY LINE TO DOUGLAS COUNTY LINE Length: 8.34

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,262,804 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,610,243

State $652,561

Other $0

Total $3,262,804

Project: M004870 Type Work: Resurface & Maintenance Descp:SR 100 FROM HEARD COUNTY LINE TO SR 166
Length: 8.93

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,996,368 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,597,095

State $399,274

Other $0

Total $1,996,368

156

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Carroll Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005827 0007640 0010948 631490631490662540-

Year
2017 2016 2015 2016 2018 2017

Phase
CST CST CST ROW CST ROW

Fund
NHPP HPP HPP STP STP STP

Federal
$346,194 $449,950 $251,972 $4,034,288 $4,946,902 $3,931,411

State
$86,549 $0 $0
$1,008,572 $1,236,726
$982,853

Other
$0 $112,487 $62,993
$0 $0 $0

Total
$432,743 $562,437 $314,965 $5,042,860 $6,183,628 $4,914,264

$13,960,718

$3,314,699

$175,480

$17,450,897

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

157

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Charlton

Project: 0000820 Type Work: Widening
Descp:SR 40 FM E OF ST MARYS RIVER TRIB TO E OF CR 66/COLERAIN RD
Lanes: Exist. 2 Prop. 4 Length: 11.47

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 33,408,629 $0 64

Phase ROW ROW CST UTL

Fund HPP HPP NHPP NHPP

Year

Federal

2016

$1,812,278

2016

$711,507

After 2018 $23,920,474

After 2018 $282,645

State $453,069 $177,877 $5,980,119
$70,661

Other $0 $0 $0 $0

Total $2,265,347
$889,383 $29,900,593
$353,306

Project Details: Widen from 2 to 4 lanes-improve operation and mobility-enhance economic development-on GRIP
corridor

Also in Camden County

Project: 0000821 Type Work: Widening
Descp:SR 40 FM SR 40 CONN TO 0.36 MI EAST OF CR 82/MAY BLUFF ROAD
Lanes: Exist. 2 Prop. 4 Length: 1.65

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2016 2017 2017

Federal $231,208
$5,322,622 $127,190

State $57,802 $1,330,655 $31,798

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,101,274 $0 23

Project Details: Widen from 2 to 5 lanes-improve operation and mobility-enhance economic development-on GRIP
corridor

Project: 0007163 Type Work: Replace Bridge
Descp:SR 252 @ SATILLA RIVER OVERFLOWS 10 MI NORTHEAST OF FOLKSON Length: 0.85

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,420,948 $0 0

Phase PE CST

Fund STP STP

Year 2016 2016

Federal $8,000
$2,728,759

State $2,000
$682,190

Other $0 $0 $0
Other $0 $0

Total $289,009 $6,653,277 $158,988
Total $10,000
$3,410,948

Project: 0007666 Type Work: Drainage Improvements
Descp:SR 4 FM BAY ST TO MAIN ST & SR 23 FM MAGNOLIA ST TO MAIN ST Length: 0.86

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,339,758 $ 810,000 15

Phase ROW CST

Fund NHPP NHPP

Year 2014 2016

Federal $648,000
$1,223,807

State $162,000 $305,952

Other $0 $0

Total $810,000 $1,529,758

Project: 570943- Type Work: Replace Bridge
Descp:CR 60 @ HATCHERS BRANCH 1 MI W OF FOLKSTON Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $102,000
$10,824 $510,000
$10,200

158

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004086 Type Work: Bridges Descp:SR 4/US 1 @ SR 23/US 301 - BEAM REPAIR
Length: 0.40

Phase CST

Fund STP

Year LUMP

Federal $48,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 60,000 $0 0

Project Details: Maintenance project-improves safety-on GRIP corridor-on State Freight corridor
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

State $12,000

Other $0

Total $60,000

Project: M004629 Type Work: Resurface & Maintenance Descp:SR 4 @ 1 LOC & SR 4 SO @ 1 LOC
Length: 1.71

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 799,228 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $639,383

State $159,846

Other $0

Total $799,228

Project: M005127 Type Work: Resurface & Maintenance
Descp:SR 4 FROM FLORIDA STATE LINE TO S OF CS 449/EULA STREET Length: 3.60

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,495,800 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,196,640

State $299,160

Other $0

Total $1,495,800

Charlton Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000820 0000820 0000821 0000821 0000821 0007163 0007163 0007666 570943-

Year
2016 2016 2016 2017 2017 2016 2016 2016 2016

Phase
ROW ROW ROW CST UTL
PE CST CST ROW

Fund
HPP HPP NHPP NHPP NHPP STP STP NHPP Local

Federal
$92,496 $235,596 $231,208 $5,322,622 $127,190
$8,000 $2,728,759 $1,223,807
$0

State
$23,124 $58,899 $57,802 $1,330,655 $31,798
$2,000 $682,190 $305,952
$0

Other
$0 $0 $0 $0 $0 $0 $0 $0 $10,824

Total
$115,620 $294,495 $289,009 $6,653,277 $158,988
$10,000 $3,410,948 $1,529,758
$10,824

$9,969,677

$2,492,419

$10,824

$12,472,920

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

159

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Chattooga

Project: 0003081 Type Work: Replace Bridge
Descp:CR 321/TALIAFERRO SPRINGS @ CHATTOOGA RIVER 1 MI S OF LYERLY Length: 0.61

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,196,777 $0 8

Phase PE
ROW CST UTL

Fund STP Local STP Local

Year 2015 2014 2016 2016

Federal $20,000 $0
$2,235,773 $0

State $5,000 $0
$558,943 $0

Other $0
$324,000 $0
$53,060

Total $25,000
$324,000 $2,794,716
$53,060

Project: 0005530 Type Work: Replace Bridge
Descp:SR 48 @ EAST FORK LITTLE RIVER 3.7 MI NE OF MENLO Length: 0.41

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,222,743 $ 35,244 11

Phase PE
ROW CST UTL

Fund Bridge STP STP STP

Year 2014 2015 2016 2016

Federal $28,195
$330,480 $1,964,721
$254,798

State $7,049
$82,620 $491,180
$63,700

Other $0 $0 $0 $0

Total $35,244
$413,100 $2,455,901
$318,498

Project: 0010702 Type Work: TE-Bike/Ped Facility
Descp:CS 588/WASHINGTON STREET FM SR 1 TO CS 590/UNIVERSITY STREET Length: 0.13

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 625,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $500,000

State $0

Other $125,000

Total $625,000

Project: 621082- Type Work: Widening
Descp:SR 1 FROM CR 329 TO N OF CR 325 @ SR 1/US 27
Lanes: Exist. 2 Prop. 4 Length: 8.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 106,710,424 $ 100,000 85

Phase PE
ROW CST UTL

Fund NHS NHPP NHPP NHPP

Year 2014 2016 2018 2018

Federal $80,000
$10,697,809 $64,593,259
$9,997,272

State $20,000 $2,674,452 $16,148,315 $2,499,318

Project Details: Provide additional capacity - improve mobility and reduce congestion - enhance economic
development - reduce crash frequency - State Freight Network

Other $0 $0 $0 $0

Total $100,000 $13,372,261 $80,741,574 $12,496,589

160

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Chattooga Totals Summary
County Summary excludes lump sum projects.

Project PI#
0003081 0003081 0003081 0005530 0005530 0005530 621082621082621082-

Year
2015 2016 2016 2015 2016 2016 2016 2018 2018

Phase
PE CST UTL ROW CST UTL ROW CST UTL

Fund
STP STP Local STP STP STP NHPP NHPP NHPP

Federal
$20,000 $2,235,773
$0 $330,480 $1,964,721 $254,798 $10,697,809 $64,593,259 $9,997,272

State
$5,000 $558,943
$0 $82,620 $491,180 $63,700 $2,674,452 $16,148,315 $2,499,318

Other
$0 $0 $53,060 $0 $0 $0 $0 $0 $0

Total
$25,000 $2,794,716
$53,060 $413,100 $2,455,901 $318,498 $13,372,261 $80,741,574 $12,496,589

$90,094,111

$22,523,528

$53,060

$112,670,700

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

161

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Clay

Project: M005077 Type Work: Resurface & Maintenance
Descp:SR 1 FM S OF MILL POND RD/CLAY TO CARNEGIE BILULAH/RANDOLPH Length: 7.67

Phase CST

Fund NHPP

Year LUMP

Total Project Cost:

$0

Total Project Authorizations:

$0

Total Parcels:

0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $0

State $0

Other $0

Total $0

Also in Randolph County

Project: M005206 Type Work: Resurface & Maintenance Descp:SR 37 FROM SR 1 TO BAKER COUNTY LINE
Length: 27.54

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,901,614 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,321,291

State $580,323

Other $0

Total $2,901,614

Also in Calhoun County

Project: M005219 Type Work: Resurface & Maintenance Descp:SR 39 FROM EARLY COUNTY LINE TO SR 37
Length: 9.25

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,686,717 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,949,374

State $737,343

Other $0

Total $3,686,717

162

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Clinch

Project: 422120- Type Work: Widening
Descp:SR 38/US 84 FROM W OF WOODYARD CREEK TO W OF GREASY BRANCH
Lanes: Exist. 2 Prop. 4 Length: 11.60

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2015 2015 2015

Federal $3,680,000 $44,391,370
$785,298

State $920,000 $11,097,843 $196,325

Other $0 $0 $0

Total $4,600,000 $55,489,213
$981,623

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 61,070,835 $0 114

Project Details: widen from 2 to 4 lanes- new alignment will bypass Argyle on north side- bridges will be
replaced-improve mobility and reduce congestion-enhance economic development- reduce crash
frequency-GRIP-State Freight Corridor

Also in Ware County

Project: M004769 Type Work: Bridges
Descp:SR 38 @ WOODY CREEK & @ LITTLE SUWANNEE CREEK - BRIDGE REHAB Length: 0.80

Phase PE CST

Fund STP STP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 150,000 $0 0

Project Details: Maintenance- improve safety
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Federal $40,000 $80,000

State $10,000 $20,000

Other $0 $0

Total $50,000
$100,000

Project: M005048 Type Work: Resurface & Maintenance
Descp:SR 89 FROM HOMERVILLE TO ATKINSON COUNTY LINE Length: 9.99

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,531,561 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,225,249

State $306,312

Other $0

Total $1,531,561

Clinch Totals Summary
County Summary excludes lump sum projects.

Project PI#
422120422120422120-

Year
2015 2015 2015

Phase
PE CST UTL

Fund
NHPP NHPP NHPP

Federal
$2,392,000 $28,854,391
$510,444

State
$598,000 $7,213,598
$127,611

Other
$0 $0 $0

Total
$2,990,000 $36,067,988
$638,055

$31,756,834

$7,939,209

$0

$39,696,043

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

163

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Coffee

Project: 0007164 Type Work: Replace Bridge Descp:SR 64 @ 17 MILE RIVER 12 MI NE OF PEARSON

Length: 0.37

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,274,345 $ 120,000 5

Phase ROW CST UTL

Fund Bridge STP STP

Year 2014 2015 2015

Federal $96,000
$3,316,565 $6,912

State $24,000 $829,141
$1,728

Other $0 $0 $0

Total $120,000 $4,145,706
$8,639

Project: 0007165 Type Work: Replace Bridge
Descp:SR 158 @ SATILLA RIVER 12 MI WEST OF DOUGLAS Length: 0.39

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,012,212 $0 4

Phase ROW CST

Fund STP STP

Year 2015 2016

Federal $97,920
$2,311,850

State $24,480 $577,962

Other $0 $0

Total $122,400 $2,889,812

Project: 0010407 Type Work: Replace Bridge
Descp:SR 32 @ BEAR CREEK APPROX 4 MI SE OF AMBROSE Length: 0.19

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,789,082 $ 120,000 4

Phase ROW CST

Fund NHPP NHPP

Year 2014 2016

Federal $96,000
$2,135,265

State $24,000 $533,816

Other $0 $0

Total $120,000 $2,669,082

Project: 0010408 Type Work: Replace Bridge
Descp:SR 32 @ HURRICANE CREEK APPROX 0.4 MI W OF NICHOLLS Length: 0.30

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,399,055 $ 110,000 4

Phase ROW CST

Fund Bridge NHPP

Year 2014 2016

Federal $88,000
$1,831,244

State $22,000 $457,811

Other $0 $0

Total $110,000
$2,289,055

Project: 0010583 Type Work: TE-Bike/Ped Facility
Descp:SR 268 FROM CR 141/MAGNOLIA STREET TO CR 142/CYPRESS AVE Length: 0.22

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 187,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $150,000

State $0

Other $37,500

Total $187,500

164

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0011678 Type Work: Replace Bridge
Descp:SR 32 @ 17 MILE RIVER APPROX 3 MI E OF DOUGLAS Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,753,771 $0 0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2016 2018 2018

Federal $127,345
$2,031,509 $44,163

State $31,836 $507,877 $11,041

Other $0 $0 $0

Total $159,181 $2,539,386
$55,204

Project: 0011679 Type Work: Replace Bridge
Descp:SR 32 @ OTTER CREEK APPROX 5 MI E OF DOUGLAS Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,760,098 $0 0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2016 2018 2018

Federal $127,345
$1,236,571 $44,163

State $31,836 $309,143 $11,041

Other $0 $0 $0

Total $159,181 $1,545,713
$55,204

Project: 0011680 Type Work: Replace Bridge
Descp:SR 32 @ BEAR CREEK APPROX 1.2 MI W OF NICHOLS Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,539,282 $0 0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2016 2018 2018

Federal $127,345
$1,059,918 $44,163

State $31,836 $264,979 $11,041

Other $0 $0 $0

Total $159,181 $1,324,897
$55,204

Project: 0011770 Type Work: RRX Warning Device Descp:CR 296/MITCHELL ROAD @ CSX #638224N
Length: 0.40

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 268,590 $ 18,590 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $18,590
$250,000

State $0 $0

Other $0 $0

Project: 0011771 Type Work: RRX Warning Device Descp:CR 16/MITCHELL ROAD @ CSX #6378191D
Length: 0.20

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 275,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $25,000
$250,000

State $0 $0

Other $0 $0

Total $18,590
$250,000
Total $25,000
$250,000

165

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012745 Type Work: Preliminary Engineering Descp:CR 100/CHANEY ROAD @ CSX #638223G
Length: 0.40

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 368,590 $ 18,590 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $18,590
$350,000

State $0 $0

Other $0 $0

Total $18,590
$350,000

Project: 0012837 Type Work: RRX Warning Device Descp:CR 145/PALMETTO ROAD @ CSX #638228R
Length: 0.40

Phase PE CST

Fund STP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 266,890 $ 16,890 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $16,890
$250,000

State $0 $0

Other $0 $0

Total $16,890
$250,000

Project: 421345- Type Work: Widening
Descp:SR 32 FM W OF CR 296 EAST TO WEST CITY LIMITS OF DOUGLAS
Lanes: Exist. 2 Prop. 4 Length: 4.20

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year

Federal

2015

$3,674,454

After 2018 $16,948,452

After 2018 $1,413,559

State $918,614 $4,237,113 $353,390

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 27,545,581 $0 112

Project Details: widen from 2 to 4 lanes- improve mobility, reduce congestion- enhance economic development
-reduce crash frequency- GRIP

Other $0 $0 $0

Total $4,593,068 $21,185,565 $1,766,949

Project: 431830- Type Work: Widening
Descp:SR 135 FM SR 31/US 441 EAST TO SR 32 INCLUDING RR SEPARATION
Lanes: Exist. 2 Prop. 4 Length: 2.76

Phase CST UTL

Fund NHPP NHPP

Year 2016 2016

Federal $19,895,687
$418,820

State $4,973,922
$104,705

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 25,393,134 $0 108

Project Details: widen from 2 to 4 lanes- improve mobility, reduce congestion- enhance economic development
-reduce crash frequency- GRIP

Other $0 $0

Total $24,869,609
$523,525

Project: M004860 Type Work: Resurface & Maintenance
Descp:SR 206 FROM N OF BROXTON HWY/BEN HILL TO N OF SR 32/COFFEE Length: 16.35

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,722,636 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,378,109

State $344,527

Other $0

Total $1,722,636

Also in Ben Hill, Irwin County

166

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005006 Type Work: Resurface & Maintenance Descp:SR 158 FROM SR 206 TO SR 31
Length: 1.41

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 321,872 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $257,498

State $64,374

Other $0

Total $321,872

Project: M005209 Type Work: Resurface & Maintenance Descp:SR 32 FROM SR 125 TO DOUGLAS CITY LIMITS
Length: 35.02

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 286,758 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $229,406

State $57,352

Other $0

Total $286,758

Also in Irwin County

Coffee Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007164 0007164 0007165 0007165 0010407 0010408 0011678 0011678 0011678 0011679 0011679 0011679 0011680 0011680 0011680 421345431830431830-

Year
2015 2015 2015 2016 2016 2016 2016 2018 2018 2016 2018 2018 2016 2018 2018 2015 2016 2016

Phase
CST UTL ROW CST CST CST ROW CST UTL ROW CST UTL ROW CST UTL ROW CST UTL

Fund
STP STP STP STP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP

Federal
$3,316,565 $6,912
$97,920 $2,311,850 $2,135,265 $1,831,244
$127,345 $2,031,509
$44,163 $127,345 $1,236,571
$44,163 $127,345 $1,059,918
$44,163 $3,674,454 $19,895,687
$418,820

State
$829,141 $1,728
$24,480 $577,962 $533,816 $457,811
$31,836 $507,877
$11,041 $31,836 $309,143 $11,041 $31,836 $264,979 $11,041 $918,614 $4,973,922 $104,705

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total
$4,145,706 $8,639
$122,400 $2,889,812 $2,669,082 $2,289,055
$159,181 $2,539,386
$55,204 $159,181 $1,545,713
$55,204 $159,181 $1,324,897
$55,204 $4,593,068 $24,869,609
$523,525

$38,531,238

$9,632,810

$0

$48,164,048

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

167

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Colquitt

Project: 0000520 Type Work: Widening
Descp:SR 133 FM S OF SR 35/US 319 TO N OF COLQUITT COUNTY LINE
Lanes: Exist. 2 Prop. 4 Length: 13.87

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 75,835,689 $ 161,000 166

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2014 2017 After 2018 After 2018

Federal $128,800
$10,214,764 $49,365,088
$959,900

State $32,200 $2,553,691 $12,341,272 $239,975

Other $0 $0 $0 $0

Total $161,000 $12,768,455 $61,706,360 $1,199,875

Project Details: widen from 2 to 4 lanes- turn lanes added at intersections- improve mobility-reduce
congestion-enhance economic development- reduce crash frequency- GRIP

Also in Worth County

Project: 0000545 Type Work: Widening
Descp:SR 133 FM CR 1/OLD QUITMAN ADEL RD/BROOKS TO CR 256/COLQUITT
Lanes: Exist. 2 Prop. 4 Length: 9.63

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 2016 2016

Federal $1,072,800 $23,623,347
$355,504

State $268,200 $5,905,837
$88,876

Other $0 $0 $0

Total $1,341,000 $29,529,183
$444,380

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 31,314,563 $ 1,341,000 105

Project Details: widen from 2 to 4 lanes- turn lanes added as needed- improve mobility-reduce congestion-enhance
economic development- reduce crash frequency- GRIP

Also in Brooks County

Project: 0000546 Type Work: Widening
Descp:SR 133 FROM CR 256/OLD BERLIN ROAD TO CR 388/HAWTHORNE DRIVE
Lanes: Exist. 2 Prop. 4 Length: 7.86

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 2016 2016

Federal $250,400
$20,946,052 $298,197

State $62,600 $5,236,513 $74,549

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 26,868,311 $ 313,000 100

Project Details: widen from 2 to 4 lanes- inclusion of turn lanes as needed- improve mobility-reduce
congestion-enhance economic development- reduce crash frequency- GRIP

Project: 0007479 Type Work: RRX Warning Device
Descp:CR 494/FUNSTON-DOERUN ROAD @ GFRR #723300L Length: 0.02

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 171,062 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $7,030
$164,032

State $0 $0

Other $0 $0 $0

Total $313,000 $26,182,565 $372,746

Other $0 $0

Total $7,030
$164,032

168

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009846 Type Work: Roundabout Descp:SR 33/US 319 @ SR 33 SO
Length: 0.27

Phase ROW CST UTL

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,896,246 $ 490,000 12

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year 2014 LUMP LUMP

Federal $490,000
$2,376,388 $29,857

State $0 $0 $0

Other $0 $0 $0

Total $490,000 $2,376,388
$29,857

Project: 0009855 Type Work: Roundabout
Descp:SR 37 @ CR 238/INDUSTRIAL DRIVE/CR 477/COOL SPRINGS ROAD Length: 0.25

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 992,000 $0 8

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $142,000 $850,000

State $0 $0

Other $0 $0

Total $142,000 $850,000

Project: 0010558 Type Work: Sidewalks Descp:C A GRAY JUNIOR HIGH SCHOOL - SRTS
Length: 0.42

Phase CST

Fund Safety

Year LUMP

Federal $114,780

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 114,780 $0 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL ANY PROJECTS FOR FY 2015 - FY 2018

State $0

Other $0

Total $114,780

Project: 0010849 Type Work: Intersection Improvement Descp:SR 35/US 319 @ CR 89 INDIAN LAKE DRIVE
Length: 0.50

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,229,487 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $1,106,538

State $122,949

Other $0

Total $1,229,487

Project: 0010855 Type Work: Signals
Descp:SR 35 @ 5 LOC; SR 38 @ 3 LOC &SR 133 @ 1 LOC-SIGNAL UPGRADES Length: 3.60

Phase ROW CST

Fund STP STP

Year LUMP LUMP

Federal $156,000
$1,283,050

State $0 $0

Other $0 $0

Total $156,000 $1,283,050

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,439,050 $0 3

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Also in Brooks County

169

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004898 Type Work: Resurface & Maintenance Descp:SR 133 FROM BROOKS COUNTY LINE TO SR 35
Length: 14.60

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,371,457 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $4,297,166

State $1,074,291

Other $0

Total $5,371,457

Project: M004981 Type Work: Resurface & Maintenance Descp:SR 35 FROM SR 33 TO SR 33
Length: 7.10

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,647,486 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,317,989

State $329,497

Other $0

Total $1,647,486

Project: M005049 Type Work: Resurface & Maintenance Descp:SR 37 FROM MITCHELL COUNTY LINE TO SR 111
Length: 12.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,317,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,053,600

State $263,400

Other $0

Total $1,317,000

Project: M005104 Type Work: Resurface & Maintenance Descp:SR 33 FROM SR 35 TO SR 133
Length: 8.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,378,131 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $3,502,505

State $875,626

Other $0

Total $4,378,131

Project: M005207 Type Work: Resurface & Maintenance Descp:SR 133 FROM SR 33 TO WORTH COUNTY LINE
Length: 11.28

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,285,453 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,628,362

State $657,091

Other $0

Total $3,285,453

170

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005208 Type Work: Resurface & Maintenance
Descp:SR 111 FROM MITCHELL COUNTY LINE TO SR 33 SO Length: 15.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,449,620 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,959,696

State $489,924

Other $0

Total $2,449,620

Colquitt Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000520 0000545 0000545 0000546 0000546

Year
2017 2016 2016 2016 2016

Phase
ROW CST UTL CST UTL

Fund
NHPP NHPP NHPP NHPP NHPP

Federal
$9,908,321 $5,433,370
$81,766 $20,946,052
$298,197

State
$2,477,080 $1,358,342
$20,441 $5,236,513
$74,549

Other
$0 $0 $0 $0 $0

Total
$12,385,401 $6,791,712 $102,207
$26,182,565 $372,746

$36,667,705

$9,166,926

$0

$45,834,632

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

171

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Columbia

Project: 0011733 Type Work: TE-Bike/Ped Facility
Descp:SR 47 FROM SR 10 TO CS 513/SOUTH HICKS STREET IN HARLEM Length: 0.09

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $200,000

State $0

Other $50,000

Total $250,000

Project: M004706 Type Work: Resurface & Maintenance
Descp:SR 223 FROM MCDUFFIE COUNTY LINE TO W OF CS 696/CREEKSIDE DR Length: 11.74

Phase CST

Fund STP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,943,099 $ 1,943,099 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,554,479

State $388,620

Other $0

Total $1,943,099

Project: M004979 Type Work: Resurface & Maintenance Descp:SR 47 FROM LINCOLN COUNTY LINE TO I-20
Length: 16.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,844,692 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,275,754

State $568,938

Other $0

Total $2,844,692

Project: M005196 Type Work: Resurface & Maintenance
Descp:I-20 FROM SR 10/MCDUFFIE TO SR 383/COLUMBIA Length: 21.84

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 20,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $18,000

State $2,000

Other $0

Total $20,000

Also in McDuffie County

172

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Cook

Project: 0010585 Type Work: TE-Bike/Ped Facility
Descp:SR 7 FROM CS 666/7TH STREET TO CS 733/EAST ROGERS STREET Length: 0.53

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 312,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $250,000

State $0

Other $62,500

Total $312,500

173

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Crawford

Project: 0011681 Type Work: Replace Bridge Descp:SR 22 @ BAILEY BRANCH 8 MI W OF ROBERTA

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,430,016 $0 5

Phase ROW CST UTL

Fund STP STP STP

Year 2016 2017 2017

Federal $242,205 $855,318 $46,489

State $60,551 $213,830 $11,622

Other $0 $0 $0

Total $302,756 $1,069,148
$58,112

Project: M005137 Type Work: Resurface & Maintenance Descp:SR 22 FROM SR 7 TO BIBB COUNTY LINE
Length: 10.64

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,428,881 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,943,105

State $485,776

Other $0

Total $2,428,881

Crawford Totals Summary
County Summary excludes lump sum projects.

Project PI#
0011681 0011681 0011681

Year
2016 2017 2017

Phase
ROW CST UTL

Fund
STP STP STP

Federal
$242,205 $855,318
$46,489

State
$60,551 $213,830
$11,622

Other
$0 $0 $0

Total
$302,756 $1,069,148
$58,112

$1,144,013

$286,003

$0

$1,430,016

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

174

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Crisp

Project: 0000481 Type Work: Widening
Descp:SR 30/SR 90 FROM 4 LN @ I-75 TO MIDWAY RD IN CORDELE
Lanes: Exist. 3 Prop. 5 Length: 0.25

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2015 2017 2017

Federal $909,942
$1,442,016 $41,925

State $227,486 $360,504
$10,481

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,992,354 $0 10

Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help
enhance economic development and will reduce crash frequency.

Project: 0010598 Type Work: TE-Bike/Ped Facility
Descp:CR 1/PATEVILLE RD; CR 468/10TH ST & CS 624/25TH AVE @ 3 LOCS Length: 0.68

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 25

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $400,000

State $0

Other $0 $0 $0
Other $100,000

Total $1,137,428 $1,802,519
$52,407
Total $500,000

Project: 0011747 Type Work: TE-Bike/Ped Facility
Descp:CS 688/PECAN ST FM SR 30/SR 90 TO CS 655/8TH AVE IN CORDELE Length: 0.63

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 12

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $200,000

State $0

Other $50,000

Total $250,000

Project: M004803 Type Work: Resurface & Maintenance
Descp:SR 300 FROM S OF CR 29/OLD CONLEY ROAD TO S OF SR 300 CONN Length: 5.60

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,150,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,720,000

State $430,000

Other $0

Total $2,150,000

175

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004805 Type Work: Resurface & Maintenance
Descp:I-75 FROM SR 159/TURNER TO N OF CR 355/OLD HATLEY RD/CRISP Length: 14.37

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 50,000 $0 0

Project Details: On Freight/GRIP Network
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $45,000

State $5,000

Other $0

Total $50,000

Also in Turner County

Project: M005068 Type Work: Resurface & Maintenance
Descp:SR 7 FROM CS 579/CATO ROAD TO DOOLY COUNTY LINE Length: 5.68

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 526,800 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $421,440

State $105,360

Other $0

Total $526,800

Crisp Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000481 0000481 0000481

Year
2015 2017 2017

Phase
ROW CST UTL

Fund
NHPP NHPP NHPP

Federal
$909,942 $1,442,016
$41,925

State
$227,486 $360,504
$10,481

Other
$0 $0 $0

Total
$1,137,428 $1,802,519
$52,407

$2,393,883

$598,471

$0

$2,992,354

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

176

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Dade

Project: 0009021 Type Work: TE-Bike/Ped Facility Descp:TRENTON DOWNTOWN STREETSCAPING
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 360,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $288,400

State $0

Other $72,100

Total $360,500

Project: 0010114 Type Work: Lighting Descp:I-59 @ SR 136 INTERCHANGE - LIGHTING
Length: 0.40

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 620,826 $0 0

Project Details: In Freight/GRIP Network.
Uses Lump Sum Bank: INTERCHANGE/ROADWAY LIGHTING FOR FY 2015 - FY 2018

Federal $558,743

State $62,083

Other $0

Total $620,826

Project: 0010448 Type Work: Signals
Descp:SR 1 @ 3 LOC; SR 2 @ 4 LOC; SR 136 @ 3 LOC &SR 146 @ 2 LOC Length: 4.80

Phase ROW CST UTL

Fund STP STP STP

Year LUMP LUMP LUMP

Federal $985,000
$1,595,238 $395,000

State $0 $0 $0

Other $0 $0 $0

Total $985,000 $1,595,238 $395,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,975,238 $0 26

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Also in Catoosa, Walker County

Project: M004513 Type Work: Signing Descp:I-59 @ 4 LOCS - SIGN UPGRADES
Length: 1.60

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 980,919 $0 0

Project Details: In Freight/GRIP Network
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $10,000
$970,919

State $0 $0

Other $0 $0

Total $10,000
$970,919

177

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004514 Type Work: Signing Descp:I-24 @ I-59 & @ SR 299 - SIGN UPGRADES
Length: 0.80

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,158,781 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $10,000
$1,148,781

State $0 $0

Other $0 $0

Total $10,000
$1,148,781

Project: M004874 Type Work: Resurface & Maintenance
Descp:SR 58 FM N OF CR 101/CEDAR LANE TO N OF CS 601/SCENIC DRIVE Length: 2.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 531,847 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $425,477

State $106,369

Other $0

Total $531,847

Project: M005061 Type Work: Resurface & Maintenance Descp:SR 136 FROM SR 58 TO WALKER COUNTY LINE
Length: 8.62

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,927,065 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,541,652

State $385,413

Other $0

Total $1,927,065

Project: M005109 Type Work: Bridges Descp:I-59 @ 2 LOCS & I-75 @ 4 LOCS
Length: 2.40

Phase PE CST

Fund NHPP NHPP

Year 2014 LUMP

Federal $20,970
$1,485,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,673,300 $ 23,300 0

Project Details: Painting bridge superstructure - on State Freight Network
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $2,330
$165,000

Other $0 $0

Total $23,300
$1,650,000

Also in Bartow, Gordon County

178

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Dawson

Project: 0000315 Type Work: Intersection Improvement
Descp:SR 52 RELOCATION @ SR 183 EXTENSION / MP 3.7 TO 5.3
Lanes: Exist. 0 Prop. 4 Length: 1.60

Phase PE
ROW CST

Fund NHPP NHPP NHPP

Year 2014 2018 After 2018

Federal $391,912 $269,174
$3,846,171

State $97,978 $67,293 $961,543

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,634,071 $ 489,889 0

Project Details: Intersection safety improvements- Intersection capacity & operational improvements- enhanced
mobility

Project: 0007030 Type Work: Replace Bridge Descp:SR 9 @ ETOWAH RIVER

Length: 0.50

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,486,544 $ 190,000 6

Phase PE
ROW CST UTL

Fund STP Bridge STP STP

Year 2015 2014 2015 2015

Federal $8,000
$152,000 $1,790,771
$838,464

State $2,000
$38,000 $447,693 $209,616

Other $0 $0 $0
Other $0 $0 $0 $0

Total $489,889 $336,467 $4,807,714
Total $10,000
$190,000 $2,238,464 $1,048,080

Project: 0007169 Type Work: Replace Bridge
Descp:SR 136 @ ETOWAH RIVER 5.7 MI EAST OF DAWSONVILLE Length: 0.32

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,958,785 $0 5

Phase PE
ROW CST

Fund STP STP STP

Year 2015 2015 2017

Federal $8,000
$143,616 $1,415,412

State $2,000
$35,904 $353,853

Other $0 $0 $0

Total $10,000
$179,520 $1,769,265

Project: 0009022 Type Work: TE-Bike/Ped Facility
Descp:DAWSON COUNTY COMMUNITY CULTURAL TRAILWAY - PHASE I Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 482,241 $0 5

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $385,793

State $0

Other $96,448

Total $482,241

Project: 0009938 Type Work: Roundabout Descp:SR 53 @ SR 183
Length: 0.56

Phase ROW CST UTL

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,420,520 $0 18

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP LUMP

Federal $876,017
$1,525,776 $18,727

State $0 $0 $0

Other $0 $0 $0

Total $876,017 $1,525,776
$18,727

179

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 132790- Type Work: Intersection Improvement Descp:SR 400 @ SR 53/CORR A1
Length: 1.37

Phase CST UTL

Fund App Dev
Local

Year 2015 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 9,677,008 $0 16

Project Details: Intersection capacity & operational improvements- enhanced mobility

Federal $9,147,908
$0

State $0 $0

Other $0
$529,100

Total $9,147,908
$529,100

Project: M004697 Type Work: Bridges
Descp:SR 136 @ SHOAL CREEK & @ BURT CREEK & SR 56 @ OPEN CREEK Length: 1.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 0

Project Details: Maintenance- improve safety along SR 136
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Federal $200,000

State $50,000

Other $0

Total $250,000

Also in Emanuel County

Dawson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000315 0007030 0007030 0007030 0007169 0007169 0007169 132790132790-

Year
2018 2015 2015 2015 2015 2015 2017 2015 2015

Phase
ROW PE CST UTL PE
ROW CST CST UTL

Fund
NHPP STP STP STP STP STP STP App Dev Local

Federal
$269,174 $8,000
$1,790,771 $838,464 $8,000 $143,616
$1,415,412 $9,147,908
$0

State
$67,293 $2,000
$447,693 $209,616
$2,000 $35,904 $353,853
$0 $0

Other
$0 $0 $0 $0 $0 $0 $0 $0 $529,100

Total
$336,467 $10,000
$2,238,464 $1,048,080
$10,000 $179,520 $1,769,265 $9,147,908 $529,100

$13,621,346

$1,118,359

$529,100

$15,268,805

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

180

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Decatur

Project: 0007171 Type Work: Replace Bridge
Descp:SR 97 @ BIG SLOUGH 3.2 MI NORTHEAST OF BAINBRIDGE Length: 0.45

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,186,554 $0 7

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Federal $195,840
$2,306,876 $46,527

State $48,960 $576,719 $11,632

Other $0 $0 $0

Total $244,800 $2,883,596
$58,158

Project: 0010599 Type Work: TE-Bike/Ped Facility
Descp:CS 617/W WATER ST @ 1 LOC & CS 618/W BROUGHTON ST @ 1 LOC Length: 0.56

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 812,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $650,000

State $0

Other $162,500

Total $812,500

Project: 0010926 Type Work: Intersection Improvement Descp:SR 38BU/US 84BU @ SR 38/US 84
Length: 0.40

Phase CST

Fund HSIP

Year LUMP

Federal $550,800

State $61,200

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 612,000 $0 0

Project Details: Intersection reconstruction Improve operation reduce vehicular and pedestrian crash frequency
and severity
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Other $0

Total $612,000

Project: 0011683 Type Work: Replace Bridge
Descp:SR 253 @ SPRING CREEK 12 MI SW OF BAINBRIDGE Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,201,731 $0 4

Phase ROW CST UTL

Fund STP STP STP

Year 2016 2018 2018

Federal $127,345
$1,589,876 $44,163

State $31,836 $397,469 $11,041

Other $0 $0 $0

Total $159,181 $1,987,345
$55,204

Project: M004389 Type Work: Resurface & Maintenance Descp:SR 1BU FROM SR 38BU TO SR 97
Length: 0.82

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 138,605 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $110,884

State $27,721

Other $0

Total $138,605

181

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004895 Type Work: Resurface & Maintenance Descp:SR 1/US 27 FROM SR 38 TO SR 38
Length: 3.20

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,067,658 $0 0

Project Details: On Freight/GRIP Network
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $854,126

State $213,532

Other $0

Total $1,067,658

Project: M005026 Type Work: Resurface & Maintenance Descp:SR 309 FROM SR 97 TO SR 262
Length: 7.34

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 27,613 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $22,090

State $5,523

Other $0

Total $27,613

Project: M005083 Type Work: Resurface & Maintenance
Descp:SR 1 FROM 1 MI S OF CR 193/JOHNNY SKIPPER ROAD TO SR 38 Length: 2.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 484,656 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $387,725

State $96,931

Other $0

Total $484,656

Project: M005105 Type Work: Bridges Descp:SR 1 SB & NB @ FLINT RIVER
Length: 0.80

Phase PE CST

Fund STP STP

Year 2014 LUMP

Federal $160,000
$2,880,000

State $40,000 $720,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,800,000 $ 200,000 0

Project Details: Rehab bridge deck, joint replacement, and zone painting on State Freight Network on GRIP
Network
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Other $0 $0

Total $200,000 $3,600,000

182

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005165 Type Work: Resurface & Maintenance
Descp:SR 38BU/US 84BU FROM CSX #637632V TO FRONTAGE ROAD Length: 1.63

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 493,743 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $394,994

State $98,749

Other $0

Total $493,743

Decatur Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007171 0007171 0007171 0011683 0011683 0011683

Year
2015 2016 2016 2016 2018 2018

Phase
ROW CST UTL ROW CST UTL

Fund
STP STP STP STP STP STP

Federal
$195,840 $2,306,876
$46,527 $127,345 $1,589,876
$44,163

State
$48,960 $576,719
$11,632 $31,836 $397,469 $11,041

Other
$0 $0 $0 $0 $0 $0

Total
$244,800 $2,883,596
$58,158 $159,181 $1,987,345
$55,204

$4,310,628

$1,077,657

$0

$5,388,285

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

183

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Dodge

Project: 0013079 Type Work: RRX Consolidation
Descp:CS 692 @ CSX #635214X/DODGE & CS 729 @ CSX #635213R/TELFAIR Length: 0.42

Phase CST

Fund HSIP

Year LUMP

Federal $240,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 240,000 $0 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018

State $0

Other $0

Total $240,000

Also in Telfair County

Project: 222410- Type Work: Widening
Descp:SR 87/US 23 FM LOG CABIN/DODGE TO S OF SR 257/BLECKLEY-TIA
Lanes: Exist. 2 Prop. 4 Length: 9.50

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 31,613,029 $ 6,906,751 220

Phase PE CST CST UTL

Fund STP State STP Local

Year 2014 2014 2017 2017

Federal $120,000 $0
$19,178,027 $0

State $30,000
$0 $4,794,507
$0

Other $0
$6,756,751 $0
$733,745

Total $150,000 $6,756,751 $23,972,534 $733,745

Project Details: Widen from 2 to 4 lanes - provide additional capacity to improve mobility and reduce congestion -
enhance economic development and will reduce crash frequency on SR 87 in Dodge and Bleckley
county.

Also in Bleckley County

Project: M004939 Type Work: Resurface & Maintenance Descp:SR 27BU FROM SR 27 TO SR 27
Length: 3.89

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,222,463 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $977,970

State $244,493

Other $0

Total $1,222,463

Project: M004966 Type Work: Resurface & Maintenance
Descp:SR 87 FROM SR 27 TO 0.04 MI S OF CR 499/TANNER DRIVE Length: 4.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 573,331 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $458,665

State $114,666

Other $0

Total $573,331

184

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Dodge Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

222410222410-

2017

CST

2017

UTL

STP Local

$16,109,543 $0

$4,027,386 $0

$0 $616,346

$20,136,928 $616,346

$16,109,543

$4,027,386

$616,346

$20,753,274

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

185

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Dooly

Project: 0005320 Type Work: Interchange Descp:I-75 @ SR 215

Length: 1.89

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 18,633,032 $ 4,600,000 28

Phase PE
ROW CST UTL

Fund NHS NHPP NHPP NHPP

Year 2014 2014 2015 2015

Federal $640,000
$3,040,000 $10,060,433
$1,165,992

State $160,000 $760,000 $2,515,108 $291,498

Project Details: Add a center turn lane to bridge-improve operation and mobility-reduce crash frequency

Other $0 $0 $0 $0

Total $800,000 $3,800,000 $12,575,542 $1,457,490

Project: 0007172 Type Work: Replace Bridge Descp:SR 230 @ TURKEY CREEK S OF BYROMVILLE

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,291,056 $ 100,000 3

Phase PE
ROW CST

Fund STP STP STP

Year 2015 2014 2016

Federal $40,000 $80,000
$912,845

State $10,000 $20,000 $228,211

Other $0 $0 $0

Total $50,000
$100,000 $1,141,056

Project: 0010600 Type Work: TE-Bike/Ped Facility
Descp:SR 7 @ 2 LOCS & CS 741/COTTON STREET @ 1 LOC IN VIENNA Length: 0.28

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 293,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $234,400

State $0

Other $58,600

Project: 0010601 Type Work: TE-Bike/Ped Facility
Descp:SR 7 @ 1 LOC; SR 230 @ 1 LOC & CS 533/THIRD STREET @ 1 LOC Length: 0.27

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 625,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $500,000

State $0

Other $125,000

Total $293,000
Total $625,000

186

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 311665- Type Work: Interchange Descp:I-75 @ SR 27 - WIDEN BRIDGE & RAMPS
Length: 0.70

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 2015 2015

Federal $40,000
$14,455,260 $988,118

State $10,000 $3,613,815 $247,030

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 19,354,222 $ 50,000 21

Project Details: Reconstruct interchange ramps and add turn bays-improve operation and mobility-reduce crash
frequency

Other $0 $0 $0

Total $50,000
$18,069,075 $1,235,148

Project: M004974 Type Work: Resurface & Maintenance Descp:SR 329 FROM SR 26/MACON TO SR 230/DOOLY
Length: 9.45

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 829,727 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $663,782

State $165,945

Other $0

Total $829,727

Also in Macon County

Project: M004990 Type Work: Resurface & Maintenance Descp:SR 230 FROM SR 230 CONN TO SR 27
Length: 10.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,664,725 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,331,780

State $332,945

Other $0

Total $1,664,725

Project: M005155 Type Work: Resurface & Maintenance Descp:SR 257 FROM CRISP COUNTY LINE TO SR 215
Length: 3.65

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 384,564 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $307,651

State $76,913

Other $0

Total $384,564

187

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Dooly Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005320 0005320 0007172 0007172 311665311665-

Year
2015 2015 2015 2016 2015 2015

Phase
CST UTL PE CST CST UTL

Fund
NHPP NHPP STP STP NHPP NHPP

Federal
$10,060,433 $1,165,992 $40,000 $912,845
$14,455,260 $988,118

State
$2,515,108 $291,498 $10,000 $228,211
$3,613,815 $247,030

Other
$0 $0 $0 $0 $0 $0

Total
$12,575,542 $1,457,490 $50,000 $1,141,056
$18,069,075 $1,235,148

$27,622,648

$6,905,662

$0

$34,528,310

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

188

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Early

Project: 0006112 Type Work: RRX Warning Device Descp:CS 630/ARLINGTON AVE @ NS #733632H
Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 185,239 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $185,239

State $0

Other $0

Total $185,239

Project: 0009036 Type Work: TE-Bike/Ped Facility Descp:BLAKELY GATEWAY PROJECT
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,000,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $800,000

State $0

Other $200,000

Total $1,000,000

Project: 0013150 Type Work: Signing
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 7 LOCS IN EARLY COUNTY Length: 23.89

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 92,429 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $92,429

State $0

Other $0

Total $92,429

Project: M005094 Type Work: Resurface & Maintenance
Descp:SR 45 FROM MILLER COUNTY LINE TO CALHOUN COUNTY LINE Length: 12.97

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,277,509 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,822,007

State $455,502

Other $0

Total $2,277,509

189

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005223 Type Work: Resurface & Maintenance
Descp:SR 273 SPUR FROM GEORGIA PACIFIC PAPER MILL TO SR 370 Length: 0.75

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 137,966 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $110,373

State $27,593

Other $0

Total $137,966

190

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Echols

Project: M004801 Type Work: Resurface & Maintenance Descp:SR 7 FROM FLORIDA STATE LINE TO NSR
Length: 5.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,100,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $880,000

State $220,000

Other $0

Total $1,100,000

Also in Lowndes County

Project: M005095 Type Work: Resurface & Maintenance
Descp:SR 11 FROM SR 94/ECHOLS COUNTY TO SR 38/LANIER COUNTY Length: 16.56

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,046,278 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,437,022

State $609,256

Other $0

Total $3,046,278

Also in Lanier County

191

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Effingham

Project: 0004913 Type Work: Widening
Descp:SR 119 FROM USHER ROAD TO SR 21 FOR CENTER TURN LANE
Lanes: Exist. 2 Prop. 3 Length: 3.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,140,828 $ 50,000 31

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2016 After 2018 After 2018

Federal $40,000
$394,520 $2,772,151
$105,992

State $10,000 $98,630 $693,038 $26,498

Project Details: widen from 2 to 3 lane- addition of a center turn lane and related improvements- improve operation
and mobility- reduce crash frequency-on 2 State Bicycle Routes-locals/consultant pursuing scaled
back version of project

Other $0 $0 $0 $0

Total $50,000
$493,150 $3,465,189
$132,490

Project: 0006700 Type Work: New Construction
Descp:EFFINGHAM PKWY FROM SR 119/EFFINGHAM TO SR 30/CHATHAM
Lanes: Exist. 0 Prop. 4 Length: 14.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 100,691,462 $0 94

Phase PE
ROW CST UTL

Fund STP Local STP Local

Year

Federal

After 2018

$87,768

2017

$0

After 2018 $58,619,068

After 2018

$0

State $21,942
$0 $14,654,767
$0

Other $0
$26,112,084 $0
$1,195,834

Total $109,710 $26,112,084 $73,273,835 $1,195,834

Project Details: new 0-4 lanes roadway- enhance mobility and connectivity-enhance economic development

Also in Chatham County

Project: 0009437 Type Work: RRX Surface Rehab/Recst Descp:CR 115/INDIGO ROAD @ CSX #635134E
Length: 0.40

Phase CST

Fund HSIP

Year LUMP

Federal $79,591

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 79,591 $0 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018

State $0

Other $0

Total $79,591

Project: 0009870 Type Work: Roundabout Descp:SR 17 @ SR 119
Length: 0.50

Phase ROW CST UTL

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,948,268 $0 10

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP LUMP

Federal $251,777
$1,612,342 $84,150

State $0 $0 $0

Other $0 $0 $0

Total $251,777 $1,612,342
$84,150

192

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009872 Type Work: Roundabout Descp:SR 275 @ CR 307/RINCON-STILL ROAD
Length: 0.40

Phase ROW CST

Fund Safety Safety

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,034,340 $0 8

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $150,000 $884,340

State $0 $0

Other $0 $0

Total $150,000 $884,340

Project: 0010434 Type Work: Intersection Improvement
Descp:CR 156/BLUE JAY RD/BLANFORD RD @ CR 143/CR 176/MCCALL RD Length: 0.40

Phase PE CST

Fund Safety Safety

Year LUMP LUMP

Federal $225,000 $589,500

State $25,000 $65,500

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 905,000 $0 0

Project Details: Intersection improvement- improve the capacity and operations to enhance mobility- increase safety
Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018

Other $0 $0

Total $250,000 $655,000

Project: 0010869 Type Work: TE-Bike/Ped Facility
Descp:SR 21BU FROM CS 610/1ST STREET TO SR 119 IN SPRINGFIELD Length: 0.19

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $300,000

State $0

Other $75,000

Total $375,000

Project: M004630 Type Work: Resurface & Maintenance
Descp:SR 21 FROM 0.20 MI N OF NS #916917C TO JACKS BRANCH Length: 6.64

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,352,428 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $5,081,942

State $1,270,486

Other $0

Total $6,352,428

193

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005055 Type Work: Resurface & Maintenance
Descp:SR 119 FROM CS 616/CRAWFORD ST TO CR 104/PRIESTER RD Length: 7.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,642,600 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,114,080

State $528,520

Other $0

Total $2,642,600

Project: M005183 Type Work: Resurface & Maintenance
Descp:SR 17 FROM SR 30 TO CS 555/SAMUEL SMALLS SENIOR AVE Length: 10.06

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,958,362 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,566,690

State $391,672

Other $0

Total $1,958,362

Effingham Totals Summary
County Summary excludes lump sum projects.

Project PI#
0004913 0006700

Year
2016 2017

Phase
ROW ROW

Fund
STP Local

Federal
$394,520 $0

State
$98,630 $0

Other
$0 $24,023,117

Total
$493,150 $24,023,117

$394,520

$98,630

$24,023,117

$24,516,267

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

194

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Elbert

Project: 0009863 Type Work: Replace Bridge Descp:SR 368 @ PICKENS CREEK

Length: 0.25

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,320,298 $ 160,000 6

Phase ROW CST UTL

Fund STP STP STP

Year 2014 2015 2015

Federal $128,000 $855,206 $73,032

State $32,000 $213,802 $18,258

Other $0 $0 $0

Total $160,000 $1,069,008
$91,290

Project: 122650- Type Work: Widening
Descp:SR 72 FM WEST CITY LIMITS OF COMER TO E OF BROAD RVR/ELBERT
Lanes: Exist. 2 Prop. 4 Length: 9.33

Phase PE CST CST

Fund NHPP NHPP Bond

Year 2015 2015 2015

Federal $104,000
$1,079,729 $0

State $26,000 $269,932 $55,573,560

Other $0 $0 $0

Total $130,000 $1,349,661 $55,573,560

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 57,053,221 $ 56,923,221 0

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development - Project on GRIP corridor & State Freight
Network

Also in Madison County

Project: M004845 Type Work: Resurface & Maintenance Descp:SR 72 FROM MADISON COUNTY LINE TO SR 17
Length: 8.10

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,817,301 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $3,853,841

State $963,460

Other $0

Total $4,817,301

Project: M004996 Type Work: Bridges
Descp:SR 28; SR 52; SR 72 & SR 77 @ 4 LOCS - SCOUR REPAIR & REHAB Length: 1.20

Phase PE CST

Fund STP STP

Year 2014 LUMP

Federal $360,000
$1,680,000

State $90,000 $420,000

Other $0 $0

Total $450,000 $2,100,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,550,000 $ 450,000 0

Project Details: Painting steel superstructure - deck rehab - correct broken welds - joint replacement - spall repairs
on State Freight Network on GRIP network
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Also in Hart, Lumpkin, Rabun County

195

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Elbert Totals Summary
County Summary excludes lump sum projects.

Project PI#
0009863 0009863 122650122650122650-

Year
2015 2015 2015 2015 2015

Phase
CST UTL PE CST CST

Fund
STP STP NHPP Bond NHPP

Federal
$855,206 $73,032 $2,080 $0 $21,595

State
$213,802 $18,258 $520
$1,111,471 $5,399

Other
$0 $0 $0 $0 $0

Total
$1,069,008 $91,290 $2,600
$1,111,471 $26,993

$951,913

$1,349,449

$0

$2,301,362

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

196

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Emanuel

Project: 0006109 Type Work: RRX Warning Device Descp:CS 818/COLEMAN STREET @ OGE #732673J
Length: 0.20

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 161,338 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $161,338

State $0

Other $0

Project: 0006516 Type Work: RRX Warning Device Descp:CS 893/GREENE STREET @ G&F #732671V
Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 191,215 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $191,215

State $0

Other $0

Project: 0006517 Type Work: RRX Warning Device Descp:CS 814/PINE STREET @ NS/OGE #732680U
Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 179,264 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $179,264

State $0

Other $0

Project: 0009917 Type Work: Roundabout Descp:SR 4/US 1 @ SR 57
Length: 0.12

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,104,081 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $165,612 $938,469

State $0 $0

Other $0 $0

Total $161,338
Total $191,215
Total $179,264
Total $165,612 $938,469

197

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0010718 Type Work: TE-Bike/Ped Facility
Descp:SWAINSBORO DOWNTOWN STREETSCAPE IMPROVEMENTS @ 5 LOCS Length: 0.74

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 668,260 $0 16

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $534,608

State $0

Other $133,652

Total $668,260

Project: 0013257 Type Work: Pedestrian Crossings
Descp:SR 4BU; SR 23; SR 26 & SR 46 @ 5 LOCS PEDESTRIAN UPGRADES Length: 2.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 795,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $153,000 $562,500

State $17,000 $62,500

Other $0 $0

Total $170,000 $625,000

Also in Treutlen County

Project: 222630- Type Work: Widening
Descp:SR 4BU/US 1BU FM SWAINSBORO BYPASS N TO CR 382/INJUNCTION RD
Lanes: Exist. 2 Prop. 5 Length: 1.96

Phase PE CST

Fund NHPP NHPP

Year 2014 2015

Federal $112,000
$4,781,024

State $28,000 $1,195,256

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,116,280 $ 140,000 52

Project Details: Widen 2 to 5 lanes - provide additional capacity to improve mobility and reduce congestion-
enhance economic development and reduce crash frequency on SR 4/US 1 in Emanuel County on
the statewide freight network.

Other $0 $0

Total $140,000 $5,976,280

Project: M003880 Type Work: Bridges
Descp:I-16 @ 1 LOC; I-285 @ 4 LOCS - STEEL BEAM REPAIR Length: 2.00

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Federal $24,842
$104,336

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 143,531 $0 0

Project Details: Maintenance- improve safety along I-16- on the statewide freight network
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $2,760 $11,593

Other $0 $0

Total $27,602 $115,928

Also in DeKalb, Fulton County

198

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004189 Type Work: Signing
Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,700,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,700,000

Project: M004697 Type Work: Bridges
Descp:SR 136 @ SHOAL CREEK & @ BURT CREEK & SR 56 @ OPEN CREEK Length: 1.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 0

Project Details: Maintenance- improve safety along SR 136
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Federal $200,000

State $0

Other $0

Total $1,700,000

Also in Bleckley, Laurens, Treutlen County

State $50,000

Other $0

Total $250,000

Also in Dawson County

Project: M005131 Type Work: Resurface & Maintenance
Descp:SR 171 FROM SR 56/TREUTLEN TO SR 26/EMANUEL Length: 6.81

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,148,312 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $918,650

State $229,662

Other $0

Total $1,148,312

Also in Treutlen County

Project: M005186 Type Work: Resurface & Maintenance Descp:SR 57 FROM JOHNSON COUNTY LINE TO SR 4
Length: 8.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,044,805 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $835,844

State $208,961

Other $0

Total $1,044,805

Emanuel Totals Summary
County Summary excludes lump sum projects.

Project PI# 222630-

Year 2015

Phase CST

Fund NHPP

Federal $4,781,024

State $1,195,256

Other $0

Total $5,976,280

$4,781,024

$1,195,256

$0

$5,976,280

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

199

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Evans

Project: 0008297 Type Work: Replace Bridge
Descp:CR 77/DAVID TIPPINS ROAD @ BULL CREEK 5 MI E OF CLAXTON Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $102,000
$10,824 $510,000
$10,200

Project: M005080 Type Work: Resurface & Maintenance
Descp:SR 73 FROM CLAXTON CITY LIMITS TO STATESBORO CITY LIMITS Length: 8.55

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,078,831 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,463,065

State $615,766

Other $0

Total $3,078,831

Also in Bulloch County

Evans Totals Summary
County Summary excludes lump sum projects.

Project PI# 0008297

Year 2016

Phase ROW

Fund Local

Federal $0

State $0

Other $10,824

Total $10,824

$0

$0

$10,824

$10,824

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

200

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Fannin

Project: 0007456 Type Work: Pedestrian Crossings
Descp:SR 2 @ 2 LOC; SR 3 @ 9 LOC; SR 5 @ 1 LOC IN BARTOW & FANNIN Length: 4.80

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 585,830 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $158,174 $369,073

State $17,575 $41,008

Other $0 $0

Total $175,749 $410,081

Also in Bartow County

Project: 0010677 Type Work: TE-Bike/Ped Facility
Descp:CS 548/EAST MAIN ST FM CS 571/DEPOT ST TO CS 592/MOUNTAIN ST Length: 0.26

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 468,750 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $375,000

State $0

Other $93,750

Total $468,750

Project: 0013110 Type Work: Signals
Descp:SR 52 @ 1 LOC; SR 53BU @ 2 LOCS & SR 515 @ 1 LOC Length: 1.60

Phase PE
ROW CST

Fund STP STP STP

Year LUMP LUMP LUMP

Federal $100,000 $80,000 $312,000

State $25,000 $20,000 $78,000

Other $0 $0 $0

Total $125,000 $100,000 $390,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 615,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Also in Gilmer, Pickens County

Project: 620490- Type Work: New Construction
Descp:SR 771 FM SR 5 NEAR CR 18 S/MCCAYSVILLE TO TENN STATE LINE
Lanes: Exist. 0 Prop. 5 Length: 2.05

Phase ROW CST

Fund STP STP

Year 2018 After 2018

Federal $396,800
$5,554,400

State $99,200 $1,388,600

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,439,000 $0 31

Project Details: Project will improve mobility and connectivity within the transportation network. Project will also
enhance economic development opportunities locally and within the region.

Other $0 $0

Total $496,000 $6,943,000

201

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 621340- Type Work: Widening
Descp:SR 5 FM SR 2/BLUE RIDGE N TO PROP MCCAYSVILLE BYP NR CR 138
Lanes: Exist. 2 Prop. 5 Length: 8.00

Phase ROW CST

Fund App Dev App Dev

Year

Federal

2018 $13,327,000

After 2018 $28,637,000

State $0 $0

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 41,964,000 $0 145

Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help
enhance economic development and will reduce crash frequency.

Project: M003371 Type Work: Miscellaneous Improvements
Descp:SR 60 @ 2 LOCS BTWN CR 5 & CR 244 EMERGENCY SLOPE REPAIR Length: 0.80

Phase ROW CST

Fund STP STP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 209,775 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $30,914
$136,906

State $7,729
$34,227

Other $0 $0

Total $13,327,000 $28,637,000

Other $0 $0

Total $38,643
$171,133

Fannin Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

620490621340-

2018 2018

ROW ROW

STP App Dev

$396,800 $13,327,000

$99,200 $0

$0

$496,000

$0

$13,327,000

$13,723,800

$99,200

$0

$13,823,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

202

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Franklin

Project: 0010691 Type Work: TE-Bike/Ped Facility
Descp:LAVONIA DOWNTOWN STREETSCAPE ENHANCEMENT @ 5 LOCS - PHASE II Length: 0.39

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $200,000

State $0

Other $50,000

Total $250,000

Project: 0010695 Type Work: TE-Bike/Ped Facility
Descp:CS 815/RAILROAD ST @ 1 LOC & CS 830/CS 858/BOWERS ST @ 1 LOC Length: 0.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 437,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $350,000

State $0

Other $87,500

Total $437,500

Project: M004808 Type Work: Resurface & Maintenance
Descp:I-85 FROM N OF SR 63/BANKS TO 0.50 MI S OF SR 17/FRANKLIN Length: 17.77

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 50,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $45,000

State $5,000

Other $0

Total $50,000

Also in Banks County

Project: M004849 Type Work: Resurface & Maintenance
Descp:SR 17 FROM N OF CR 108/CLARKS CREEK RD TO STEPHENS CO LINE Length: 0.76

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 147,362 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $117,890

State $29,472

Other $0

Total $147,362

203

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005174 Type Work: Resurface & Maintenance
Descp:SR 17 FROM SR 17BU/HART TO SR 17BU/FRANKLIN Length: 2.47

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 710,792 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $568,634

State $142,158

Other $0

Total $710,792

Also in Hart County

Project: M005200 Type Work: Resurface & Maintenance
Descp:SR 106 FROM SR 59/FRANKLIN TO SR 63/STEPHENS Length: 9.90

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,469,105 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,975,284

State $493,821

Other $0

Total $2,469,105

Also in Stephens County

Project: M005227 Type Work: Bridges
Descp:I-85 @ 9 LOCS & I-985 @ 6 LOCS - BRIDGE PRESERVATION Length: 0.00

Phase PE CST

Fund IM NHPP

Year 2014 LUMP

Federal $40,500
$1,376,779

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,574,754 $ 45,000 0

Project Details: Painting steel superstructure on State Freight Network
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $4,500
$152,975

Other $0 $0

Total $45,000
$1,529,754

Also in Gwinnett, Hall, Jackson County

204

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Gilmer

Project: 0006612 Type Work: TE-Bike/Ped Facility
Descp:ELLIJAY STREETSCAPE FM SR 282 TO SPRING STREET - PHASE III Length: 1.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 20

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $300,000

State $0

Other $75,000

Total $375,000

Project: 0013110 Type Work: Signals
Descp:SR 52 @ 1 LOC; SR 53BU @ 2 LOCS & SR 515 @ 1 LOC Length: 1.60

Phase PE
ROW CST

Fund STP STP STP

Year LUMP LUMP LUMP

Federal $100,000 $80,000 $312,000

State $25,000 $20,000 $78,000

Other $0 $0 $0

Total $125,000 $100,000 $390,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 615,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Also in Fannin, Pickens County

Project: 631260- Type Work: New Construction
Descp:SR 382 EXT FM CR 239 TO SR 5/SR 515 NEW APD CORRIDOR
Lanes: Exist. 0 Prop. 2 Length: 0.79

Phase ROW CST UTL

Fund STP STP STP

Year 2017 2018 2018

Federal $2,701,411 $3,719,794
$600,100

State $675,353 $929,948 $150,025

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,776,631 $0 5

Project Details: Project will improve mobility and connectivity within the transportation network. Project will also
enhance economic development opportunities locally and within the region.

Project: M003646 Type Work: Shoulder Work
Descp:SR 282 FROM COURIER STREET TO CR 239/MAIN STREET Length: 0.22

Phase Fund CST Emergency

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $5,600

State $1,400

Other $0 $0 $0
Other $0

Total $3,376,764 $4,649,742
$750,125
Total $7,000

205

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005184 Type Work: Resurface & Maintenance
Descp:SR 282 FM MURRAY COUNTY LINE TO E OF CR 17/OLD TAILS CRK RD Length: 10.10

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,975,636 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,580,509

State $395,127

Other $0

Total $1,975,636

Gilmer Totals Summary
County Summary excludes lump sum projects.

Project PI#
631260631260631260-

Year
2017 2018 2018

Phase
ROW CST UTL

Fund
STP STP STP

Federal
$2,701,411 $3,719,794
$600,100

State
$675,353 $929,948 $150,025

Other
$0 $0 $0

Total
$3,376,764 $4,649,742
$750,125

$7,021,305

$1,755,326

$0

$8,776,631

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

206

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Glascock

Project: 270710- Type Work: Replace Bridge Descp:CR 50 @ JOES CREEK SW OF GIBSON

Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $300,000
$10,824 $510,000
$10,200

Glascock Totals Summary
County Summary excludes lump sum projects.

Project PI# 270710-

Year 2016

Phase ROW

Fund Local

Federal $0

State $0

Other $10,824

Total $10,824

$0

$0

$10,824

$10,824

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

207

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Gordon

Project: 0006416 Type Work: Realignment
Descp:SR 53 FM E OF CR 269/RYO MOUNTAIN RD TO W OF CR 178/DAVIS RD Length: 1.50

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,985,881 $0 28

Phase PE
ROW CST UTL

Fund HSIP HSIP HSIP HSIP

Year LUMP LUMP LUMP LUMP

Federal $35,100
$2,952,000 $8,161,303
$538,889

State $3,900
$328,000 $906,811 $59,877

Other $0 $0 $0 $0

Total $39,000
$3,280,000 $9,068,115
$598,766

Project Details: Realignment bring horizontal and vertical curves up to current standards add shoulders
decrease frequency of crashes
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Also in Pickens County

Project: 0010409 Type Work: Replace Bridge Descp:SR 3 @ LYNN CREEK 5 MI S OF CALHOUN

Length: 0.30

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,041,271 $0 11

Phase ROW CST UTL

Fund STP STP STP

Year 2016 2017 2017

Federal $88,326
$576,595 $168,095

State $22,082 $144,149 $42,024

Other $0 $0 $0

Total $110,408 $720,744 $210,119

Project: 0010410 Type Work: Replace Bridge Descp:SR 156 @ CSX #340683F 2 MI N OF RANGER

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,989,311 $0 7

Phase ROW CST UTL

Fund STP STP STP

Year 2016 2017 2017

Federal $88,326
$2,082,391 $220,731

State $22,082 $520,598 $55,183

Other $0 $0 $0

Total $110,408
$2,602,989 $275,914

Project: 0010708 Type Work: TE-Bike/Ped Facility
Descp:SR 3 FROM CS 746/HICKS STREET TO CS 738/PIEDMONT STREET Length: 0.33

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $400,000

State $0

Other $100,000

Total $500,000

208

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 662510- Type Work: New Construction
Descp:SOUTH CALHOUN BYPASS FM SR 53 @ CR 13 EAST TO SR 53 @ CR 64
Lanes: Exist. 0 Prop. 4 Length: 6.80

Phase CST UTL

Fund STP STP

Year 2017 2017

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 33,823,138 $0 35

Project Details: Will improve mobility and connectivity - enhance economic development

Federal $25,493,046
$1,565,464

State $6,373,261
$391,366

Other $0 $0

Total $31,866,307
$1,956,831

Project: M005109 Type Work: Bridges Descp:I-59 @ 2 LOCS & I-75 @ 4 LOCS
Length: 2.40

Phase PE CST

Fund NHPP NHPP

Year 2014 LUMP

Federal $20,970
$1,485,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,673,300 $ 23,300 0

Project Details: Painting bridge superstructure - on State Freight Network
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $2,330
$165,000

Other $0 $0

Total $23,300
$1,650,000

Also in Bartow, Dade County

Project: M005222 Type Work: Resurface & Maintenance Descp:SR 136 FROM SR 61 TO MURRAY COUNTY LINE
Length: 0.47

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 91,936 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $73,548

State $18,387

Other $0

Total $91,936

Gordon Totals Summary
County Summary excludes lump sum projects.

Project PI#
0010409 0010409 0010409 0010410 0010410 0010410 662510662510-

Year
2016 2017 2017 2016 2017 2017 2017 2017

Phase
ROW CST UTL ROW CST UTL CST UTL

Fund
STP STP STP STP STP STP STP STP

Federal
$88,326 $576,595 $168,095
$88,326 $2,082,391
$220,731 $25,493,046
$1,565,464

State
$22,082 $144,149
$42,024 $22,082 $520,598 $55,183 $6,373,261 $391,366

Other
$0 $0 $0 $0 $0 $0 $0 $0

Total
$110,408 $720,744 $210,119 $110,408 $2,602,989 $275,914 $31,866,307 $1,956,831

$30,282,976

$7,570,744

$0

$37,853,720

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

209

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Grady

Project: 0010602 Type Work: TE-Bike/Ped Facility
Descp:BROAD STREET FROM CSX #636831U TO CS 551/2ND AVE SE Length: 0.13

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 875,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $700,000

State $0

Other $175,000

Total $875,000

Project: 0012887 Type Work: Replace Bridge Descp:SR 112 @ SAPP CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,200,000 $ 200,000 0

Phase PE CST

Fund Bridge STP

Year 2014 2016

Federal $160,000
$1,600,000

State $40,000 $400,000

Other $0 $0

Total $200,000 $2,000,000

Project: M004432 Type Work: Bridge Painting
Descp:SR 93 @ LITTLE TIRED CREEK TRIB & SR 195 @ MUCKALEE CREEK Length: 0.80

Phase PE CST

Fund STP STP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 204,000 $0 0

Project Details: Bridge painting and remove lead based paint system
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Federal $3,200
$160,000

State $800
$40,000

Other $0 $0

Total $4,000
$200,000

Also in Lee County

Project: M004802 Type Work: Resurface & Maintenance Descp:SR 112 FROM SR 38 TO MITCHELL COUNTY LINE
Length: 12.90

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,150,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,520,000

State $630,000

Other $0

Total $3,150,000

210

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005035 Type Work: Resurface & Maintenance
Descp:SR 38 FM E OF UPPER HAWTHORNE TRAIL TO E OF PIERCE CHAPEL RD Length: 8.10

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,158,960 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $927,168

State $231,792

Other $0

Total $1,158,960

Project: M005057 Type Work: Resurface & Maintenance Descp:SR 93 FROM SR 111 TO SR 38
Length: 1.00

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 210,720 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $168,576

State $42,144

Other $0

Total $210,720

Project: M005141 Type Work: Resurface & Maintenance Descp:SR 111/SR 188 FROM SR 38 TO SR 93
Length: 0.80

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 193,159 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $154,527

State $38,632

Other $0

Total $193,159

Grady Totals Summary
County Summary excludes lump sum projects.

Project PI# 0012887

Year 2016

Phase CST

Fund STP

Federal $1,600,000

State $400,000

Other $0

Total $2,000,000

$1,600,000

$400,000

$0

$2,000,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

211

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Greene

Project: 0006605 Type Work: TE-Bike/Ped Facility Descp:GREENSBORO STREETSCAPE PLAN - PHASE III
Length: 1.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 750,000 $0 18

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $600,000

State $0

Other $150,000

Total $750,000

Project: 0013259 Type Work: Pedestrian Crossings
Descp:SR 12; SR 15; SR 24 BYP; SR 36 &SR 162 @5 LOC - PED UPGRADES Length: 2.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 795,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Project: 270683- Type Work: Replace Bridge
Descp:CR 25/COPELAND ROAD @ GREENBRIER CREEK SW OF PENFIELD Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $153,000 $562,500

State $17,000 $62,500

Other $0 $0

Total $170,000 $625,000

Federal $81,600 $0
$408,000 $8,160

Also in Morgan, Newton, Taliaferro County

State $20,400
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $102,000
$10,824 $510,000
$10,200

Project: M004722 Type Work: Bridges
Descp:I-20 EB & WB @ RICHLAND CREEK - SCOUR REHAB Length: 0.80

Phase CST

Fund NHPP

Year LUMP

Federal $270,000

State $30,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,000 $0 0

Project Details: Deck preservation painting superstructure spall repair scour countermeasures on State
Freight Network
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

Other $0

Total $300,000

212

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004920 Type Work: Resurface & Maintenance
Descp:I-20 FROM SR 44/GREENE TO SR10/SR 17/MCDUFFIE Length: 41.95

Phase CST

Fund NHPP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,191,045 $ 8,191,045 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Project: M005149 Type Work: Resurface & Maintenance Descp:SR 77 FROM SR 15 TO SR 12
Length: 5.70

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,223,277 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $7,371,941
Federal $978,621

State $819,105

Other $0

Total $8,191,045

Also in McDuffie, Taliaferro, Warren County

State $244,655

Other $0

Total $1,223,277

Project: M005197 Type Work: Resurface & Maintenance
Descp:I-20 FROM NS #733146T/MORGAN TO SR 44/GREENE Length: 16.84

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 20,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $18,000

State $2,000

Other $0

Total $20,000

Also in Morgan County

Greene Totals Summary
County Summary excludes lump sum projects.

Project PI# 270683-

Year 2016

Phase ROW

Fund Local

Federal $0

State $0

Other $10,824

Total $10,824

$0

$0

$10,824

$10,824

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

213

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Habersham

Project: 0009945 Type Work: Roundabout Descp:SR 384 @ CR 382/PEA RIDGE ROAD
Length: 0.26

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,520,067 $0 8

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $600,000 $920,067

State $0 $0

Other $0 $0

Total $600,000 $920,067

Project: 0010334 Type Work: Signals
Descp:SR 15 @ 2 LOCS; SR 17 @ 1 LOC & SR 105 @ 4 LOCS Length: 2.80

Phase ROW CST UTL

Fund STP STP STP

Year LUMP LUMP LUMP

Federal $302,000
$1,114,694 $49,210

State $0 $0 $0

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,465,904 $0 10

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Other $0 $0 $0

Total $302,000 $1,114,694
$49,210

Project: 0010692 Type Work: TE-Bike/Ped Facility
Descp:SR 385 FROM CR 387/MT AIRY HWY TO CS 627/FLORIDA STREET Length: 0.74

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $300,000

State $0

Other $75,000

Total $375,000

Project: 0010693 Type Work: TE-Bike/Ped Facility
Descp:CS 879/LEVEL GROVE RD FM CS 878/IRVIN ST TO SR 15/US 411 BYP Length: 0.94

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 14

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $300,000

State $0

Other $75,000

Total $375,000

214

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0012829 Type Work: Operational Improvement Descp:SR 105/US 441 @ SR 15/US 23
Length: 0.40

Phase PE CST

Fund STP STP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 390,000 $ 150,000 0

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $120,000 $192,000

State $30,000 $48,000

Other $0 $0

Total $150,000 $240,000

Project: 0013154 Type Work: RRX Warning Device
Descp:RAILROAD CROSSING UPGRADES @SEV LOC FM TOCCOA TO OAKWOOD Length: 0.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 505,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Project: 0013237 Type Work: Signing
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 17 LOC IN HABERSHAM COUNTY Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 335,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $5,000
$500,000
Federal $335,000

State $0 $0

Other $0 $0

Total $5,000
$500,000

Also in Banks, Hall, Stephens County

State $0

Other $0

Total $335,000

Project: M003643 Type Work: Drainage Improvements
Descp:SR 15/US 441 FROM CR 123/JOHN WOOD RD TO CR 125/TOM BORN RD Length: 2.02

Phase Fund

Year

CST Emergency LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 43,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $34,400

State $8,600

Other $0

Total $43,000

Project: M005060 Type Work: Resurface & Maintenance Descp:SR 385 FROM SR 105 TO SR 17
Length: 4.56

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,136,808 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $909,446

State $227,362

Other $0

Total $1,136,808

215

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005126 Type Work: Resurface & Maintenance Descp:SR 105 FROM SR 15 TO N OF VISION DRIVE
Length: 3.45

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,027,314 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $821,851

State $205,463

Other $0

Total $1,027,314

Project: M005144 Type Work: Resurface & Maintenance Descp:SR 15 CONN FROM W OF SR 365/US 23 TO SR 15

Phase CST

Length: 0.71

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 157,338 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $125,870

State $31,468

Other $0

Total $157,338

216

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Hancock

Project: 0010411 Type Work: Replace Bridge
Descp:SR 16 @ LITTLE SHOULDERBONE CREEK 8.6 MI NW OF SPARTA Length: 0.34

Phase ROW CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,277,620 $0 4

Fund STP STP

Year 2015 2017

Federal $96,288
$1,725,808

State $24,072 $431,452

Other $0 $0

Total $120,360 $2,157,260

Project: 0010713 Type Work: TE-Rehab Hist Trans Bldg Descp:HANCOCK COUNTY DEPOT WELCOME CENTER
Length: 0.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 656,300 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $525,040

State $0

Other $131,260

Total $656,300

Project: 0010719 Type Work: TE-Bike/Ped Facility Descp:SR 15 FROM CR 79/COURT STREET TO SR 16
Length: 0.67

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 625,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $500,000

State $0

Other $125,000

Total $625,000

Project: M004710 Type Work: Resurface & Maintenance Descp:SR 22 FROM BALDWIN COUNTY LINE TO SR 16
Length: 12.45

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,190,845 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,752,676

State $438,169

Other $0

Total $2,190,845

Project: M004967 Type Work: Resurface & Maintenance
Descp:SR 15 FROM WASHINGTON COUNTY LINE TO SR 16 Length: 9.40

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,314,209 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,651,367

State $662,842

Other $0

Total $3,314,209

217

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Hancock Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0010411

2015

ROW

STP

0010411

2017

CST

STP

$96,288 $1,725,808

$24,072 $431,452

$0

$120,360

$0

$2,157,260

$1,822,096

$455,524

$0

$2,277,620

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

218

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Haralson

Project: 0000761 Type Work: Intersection Improvement
Descp:SR 100 FM SR 8 TO SR 120 IN TALLAPOOSA&DRAINAGE IMPROVEMENTS Length: 0.85

Phase ROW CST

Fund STP STP

Year 2018 After 2018

Federal $31,667
$1,149,587

State $7,917
$287,397

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,476,568 $0 0

Project Details: Intersection safety improvements- Intersection capacity & operational improvements- enhanced
mobility

Project: 0009089 Type Work: TE-Bike/Ped Facility Descp:TALLAPOOSA STREETSCAPE - PHASE III
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 531,250 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $425,000

State $0

Other $0 $0
Other $106,250

Total $39,584
$1,436,983
Total $531,250

Project: 0009864 Type Work: Replace Bridge Descp:SR 120 @ BEACH CREEK E OF TALLAPOOSA

Length: 0.30

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,008,803 $0 2

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Federal $97,920
$3,845,949 $63,173

State $24,480 $961,487 $15,793

Other $0 $0 $0

Total $122,400 $4,807,437
$78,966

Project: 0009901 Type Work: Roundabout Descp:I-20 @ SR 348/WACO ROAD - EB & WB RAMPS
Length: 0.43

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,876,937 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $220,816
$1,656,121

State $0 $0

Other $0 $0

Total $220,816 $1,656,121

Project: 0013048 Type Work: RRX Warning Device Descp:CR 279/JOHN ALLEN ROAD @ NS #726681M
Length: 0.20

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 255,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $5,000
$250,000

State $0 $0

Other $0 $0

Total $5,000
$250,000

219

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013088 Type Work: RRX Warning Device Descp:CR 91/NITRA ROAD @ NS #726699X
Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 260,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $260,000

State $0

Other $0

Total $260,000

Project: M004648 Type Work: Resurface & Maintenance
Descp:SR 1BU FROM N OF SR 1/CARROLL TO S OF SR 1/HARALSON Length: 4.74

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,125,960 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $900,768

State $225,192

Other $0

Total $1,125,960

Also in Carroll County

Haralson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000761 0009864 0009864 0009864

Year
2018 2015 2016 2016

Phase
ROW ROW CST UTL

Fund
STP STP STP STP

Federal
$31,667 $97,920 $3,845,949 $63,173

State
$7,917 $24,480 $961,487 $15,793

Other
$0 $0 $0 $0

Total
$39,584 $122,400 $4,807,437
$78,966

$4,038,710

$1,009,678

$0

$5,048,388

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

220

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Harris

Project: 0007036 Type Work: Replace Bridge
Descp:SR 219 @ MOUNTAIN OAK CREEK SOUTH OF WHITESVILLE Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,758,320 $ 519,714 0

Phase PE
ROW CST

Fund Bridge STP STP

Year 2014 2016 2018

Federal $415,771 $54,586
$4,136,299

State $103,943
$13,646 $1,034,075

Other $0 $0 $0

Total $519,714
$68,232 $5,170,374

Project: 0008600 Type Work: Replace Bridge
Descp:CR 386/FORTSON ROAD @ STANDING BOY CREEK Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,356,425 $ 727,960 4

Phase PE
ROW CST UTL

Fund Bridge Local STP STP

Year 2014 2016 2018 2018

Federal $582,368 $0 $450,465 $9,009

State $145,592
$0 $112,616
$2,252

Other $0
$54,122 $0 $0

Total $727,960
$54,122 $563,081
$11,262

Project: 0010615 Type Work: TE-Rail to Trail Descp:SR 1 FROM CR 387/D STREET TO SR 18
Length: 4.07

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 640,591 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $512,473

State $0

Other $128,118

Project: 371150- Type Work: Replace Bridge
Descp:CR 215/EBENEZER CHURCH RD @ WILLIAMS CREEK SE OF HAMILTON I Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $640,591
Total $102,000
$10,824 $510,000
$10,200

Project: M004517 Type Work: Signing Descp:I-185 @ 16 LOCS - SIGN UPGRADES
Length: 0.00

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,943,886 $0 0

Project Details: In Freight/GRIP Network.
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $80,000
$6,863,886

State $0 $0

Other $0 $0

Total $80,000
$6,863,886

Also in Muscogee, Troup County

221

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005084 Type Work: Resurface & Maintenance Descp:SR 315 FROM SR 219 TO TALBOT COUNTY LINE
Length: 24.25

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,938,885 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $3,151,108

State $787,777

Other $0

Total $3,938,885

Project: M005085 Type Work: Resurface & Maintenance Descp:SR 103 FROM SR 219/HARRIS TO SR 18/TROUP
Length: 13.96

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,409,566 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,127,653

State $281,913

Other $0

Total $1,409,566

Also in Troup County

Project: M005103 Type Work: Resurface & Maintenance Descp:SR 18 FROM E OF I-85 TO HARRIS COUNTY LINE
Length: 6.33

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 47,627 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $38,102

State $9,525

Other $0

Total $47,627

Also in Troup County

Project: M005156 Type Work: Resurface & Maintenance
Descp:SR 219 FROM MUSCOGEE COUNTY LINE TO SR 103/SR 116 Length: 11.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,240,155 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $992,124

State $248,031

Other $0

Total $1,240,155

Project: M005215 Type Work: Resurface & Maintenance Descp:SR 116 FROM SR 1 TO CS 248/O STREET
Length: 1.85

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 350,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $280,000

State $70,000

Other $0

Total $350,000

222

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005218 Type Work: Resurface & Maintenance Descp:SR 36 FROM SR 208/HARRIS TO SR 41/TALBOT
Length: 10.15

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,857,935 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,486,348

State $371,587

Other $0

Total $1,857,935

Also in Talbot County

Harris Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007036 0007036 0008600 0008600 0008600 371150-

Year
2016 2018 2016 2018 2018 2016

Phase
ROW CST ROW CST UTL ROW

Fund
STP STP Local STP STP Local

Federal
$54,586 $4,136,299
$0 $450,465
$9,009 $0

State
$13,646 $1,034,075
$0 $112,616
$2,252 $0

Other
$0 $0 $54,122 $0 $0 $10,824

Total
$68,232 $5,170,374
$54,122 $563,081
$11,262 $10,824

$4,650,359

$1,162,590

$64,946

$5,877,895

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

223

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Hart

Project: M004996 Type Work: Bridges
Descp:SR 28; SR 52; SR 72 & SR 77 @ 4 LOCS - SCOUR REPAIR & REHAB Length: 1.20

Phase PE CST

Fund STP STP

Year 2014 LUMP

Federal $360,000
$1,680,000

State $90,000 $420,000

Other $0 $0

Total $450,000 $2,100,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,550,000 $ 450,000 0

Project Details: Painting steel superstructure - deck rehab - correct broken welds - joint replacement - spall repairs
on State Freight Network on GRIP network
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Also in Elbert, Lumpkin, Rabun County

Project: M005000 Type Work: Resurface & Maintenance Descp:SR 8 WE FROM SR 8 TO SR 8
Length: 0.55

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 137,115 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $109,692

State $27,423

Other $0

Total $137,115

Project: M005016 Type Work: Resurface & Maintenance
Descp:SR 8 FROM SR 51 TO E OF CR 33/ELIZABETH ROAD Length: 2.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 573,390 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $458,712

State $114,678

Other $0

Total $573,390

Project: M005174 Type Work: Resurface & Maintenance
Descp:SR 17 FROM SR 17BU/HART TO SR 17BU/FRANKLIN Length: 2.47

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 710,792 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $568,634

State $142,158

Other $0

Total $710,792

Also in Franklin County

224

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Heard

Project: M004915 Type Work: Bridges
Descp:SR 34 @ CHATTAHOOCHEE RIVER - BRIDGE REHAB & REPAIRS Length: 0.40

Phase PE CST

Fund STP STP

Year 2014 LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 347,947 $ 147,947 0

Project Details: Fracture critical rehab and repairs
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Federal $118,358 $160,000

State $29,589 $40,000

Other $0 $0

Total $147,947 $200,000

225

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Irwin

Project: 0000313 Type Work: Widening
Descp:SR 107 FROM W OF CR 264/IRWIN TO SR 11/US 129/BEN HILL
Lanes: Exist. 2 Prop. 4 Length: 10.45

Phase ROW CST UTL

Fund STP STP STP

Year

Federal

2018

$7,615,508

After 2018 $28,293,802

After 2018 $1,882,439

State $1,903,877 $7,073,451
$470,610

Other $0 $0 $0

Total $9,519,385 $35,367,253 $2,353,049

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 47,239,687 $0 120

Project Details: Widen from 2 to 4 lanes- improve mobility and reduce congestion- enhance economic development-
reduce crash frequency

Also in Ben Hill County

Project: 0000314 Type Work: Widening
Descp:SR 107 FROM CR 250/TURNER COUNTY TO CR 264/IRWIN COUNTY
Lanes: Exist. 2 Prop. 4 Length: 7.10

Phase ROW CST UTL

Fund STP STP STP

Year

Federal

2018

$3,643,900

After 2018 $28,865,254

After 2018 $720,865

State $910,975 $7,216,313 $180,216

Other $0 $0 $0

Total $4,554,875 $36,081,567
$901,081

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 41,537,522 $0 46

Project Details: widen from 2 to 4 lanes, improve mobility and reduce congestion, enhance economic development
and reduce crash frequency-

Also in Turner County

Project: 0007591 Type Work: Sidewalks
Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN OCILLA Length: 0.36

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 512,839 $0 0

Phase CST

Fund HPP

Year 2015

Federal $410,271

State $0

Other $102,568

Total $512,839

Project: 0010669 Type Work: TE-Bike/Ped Facility
Descp:SR 32 FROM CR 252/OAK STREET TO CS 524/RUTHERFORD DRIVE Length: 0.65

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 437,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $350,000

State $0

Other $87,500

Total $437,500

226

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004860 Type Work: Resurface & Maintenance
Descp:SR 206 FROM N OF BROXTON HWY/BEN HILL TO N OF SR 32/COFFEE Length: 16.35

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,722,636 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,378,109

State $344,527

Other $0

Total $1,722,636

Also in Ben Hill, Coffee County

Project: M005167 Type Work: Resurface & Maintenance Descp:SR 35 FROM TIFT COUNTY LINE TO SR 32
Length: 9.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,668,183 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,334,546

State $333,637

Other $0

Total $1,668,183

Project: M005182 Type Work: Resurface & Maintenance
Descp:SR 11 FROM SR 32/IRWIN TO CS 629/BUSH AVE/BEN HILL Length: 10.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,400,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,720,000

State $680,000

Other $0

Total $3,400,000

Also in Ben Hill County

Project: M005209 Type Work: Resurface & Maintenance Descp:SR 32 FROM SR 125 TO DOUGLAS CITY LIMITS
Length: 35.02

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 286,758 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $229,406

State $57,352

Other $0

Total $286,758

Also in Coffee County

Irwin Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000313 0000314 0007591

Year
2018 2018 2015

Phase
ROW ROW CST

Fund
STP STP HPP

Federal
$2,817,738 $2,113,462
$410,271

State
$704,434 $528,365
$0

Other
$0 $0 $102,568

Total
$3,522,172 $2,641,827
$512,839

$5,341,471

$1,232,800

$102,568

$6,676,838

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

227

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Jackson

Project: 0007176 Type Work: Replace Bridge
Descp:SR 82 SPUR @ NORTH OCONNEE RIVER 6.8 MI NORTH OF JEFFERSON Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,489,566 $ 341,854 0

Phase PE
ROW CST UTL

Fund Bridge STP STP STP

Year 2014 2018 After 2018 2018

Federal $273,483 $107,903
$3,774,341 $235,926

State $68,371 $26,976 $943,585 $58,981

Other $0 $0 $0 $0

Total $341,854 $134,878 $4,717,927 $294,907

Project: 0007177 Type Work: Replace Bridge
Descp:SR 334 @ SANDY CREEK 11.5 MI SOUTHEAST OF JEFFERSON Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,287,019 $ 551,291 0

Phase PE
ROW CST UTL

Fund Bridge STP STP STP

Year 2014 2017 2018 2018

Federal $441,033 $84,908
$5,967,348 $136,327

State $110,258 $21,227 $1,491,837 $34,082

Other $0 $0 $0 $0

Total $551,291 $106,135 $7,459,185 $170,408

Project: 0010022 Type Work: Sidewalks Descp:JEFFERSON CITY SCHOOL SYSTEM - SRTS
Length: 1.06

Phase CST

Fund Safety

Year LUMP

Federal $485,197

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 485,197 $0 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2015 - FY 2018

State $0

Other $0

Total $485,197

Project: 0010699 Type Work: TE-Bike/Ped Facility
Descp:SR 15 ALT FM CS 749/LAKEVIEW DRIVE TO COMMERCE MIDDLE SCHOOL Length: 1.21

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 312,500 $0 11

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $250,000

State $0

Other $62,500

Total $312,500

Project: 0011672 Type Work: Signals
Descp:I-85 @3 LOC; SR 11 @4 LOC & SR 15 ALT @1 LOC-SIGNAL UPGRADES Length: 3.20

Phase CST UTL

Fund STP STP

Year LUMP LUMP

Federal $1,335,752
$146,940

State $0 $0

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,482,692 $0 8

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Other $0 $0

Total $1,335,752
$146,940

228

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0011677 Type Work: Replace Bridge
Descp:SR 11 @ MULBERRY RIVER TRIBUTARY 6.3 MI SW OF JEFFERSON Length: 0.14

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 775,588 $0 4

Phase ROW CST

Fund STP STP

Year 2016 2017

Federal $114,860 $505,610

State $28,715 $126,403

Other $0 $0

Total $143,575 $632,013

Project: 110630- Type Work: Widening
Descp:I-85 FM N OF SR 53/GREEN ST TO N OF SR 11/US 129/LEE ST
Lanes: Exist. 4 Prop. 6 Length: 8.00

Phase PE CST

Fund NHPP NHPP

Year 2018 After 2018

Federal $353,306
$67,748,412

State $88,326 $16,937,103

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 85,127,148 $0 0

Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help
enhance economic development and will reduce crash frequency.

Project: 121340- Type Work: Replace Bridge
Descp:SR 11/US 129 @ ALLEN CREEK NORTH OF TALMO Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,625,505 $ 20,000 0

Phase PE CST

Fund Bridge NHPP

Year 2014 2016

Federal $16,000
$2,084,404

State $4,000
$521,101

Other $0 $0

Total $441,632 $84,685,515

Other $0 $0

Total $20,000
$2,605,505

Project: 122150- Type Work: Widening
Descp:SR 11/US 129 FM SR 332 @ TALMO/JACKSON TO SR 323/HALL
Lanes: Exist. 2 Prop. 4 Length: 6.72

Phase CST UTL

Fund NHPP NHPP

Year 2016 2016

Federal $30,808,083
$645,642

State $7,702,021
$161,411

Other $0 $0

Total $38,510,104
$807,053

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 39,317,157 $0 188

Project Details: Widen from 2 to 4 lanes - reduce congestion - improve operation and mobility - reduce crash
frequency - enhance economic development.

Also in Hall County

Project: M004774 Type Work: Resurface & Maintenance Descp:SR 98 FROM I-85 TO SR 98WE
Length: 2.70

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 617,515 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $494,012

State $123,503

Other $0

Total $617,515

229

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005020 Type Work: Resurface & Maintenance Descp:SR 326 FROM SR 98 TO SR 15
Length: 1.10

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 358,026 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $286,420

State $71,605

Other $0

Total $358,026

Project: M005098 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 11BU TO 0.45 MI N OF SR 332
Length: 6.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,867,629 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $3,094,103

State $773,526

Other $0

Total $3,867,629

Project: M005136 Type Work: Resurface & Maintenance
Descp:SR 11 FROM CR 205/TALMO TRAIL ROAD TO HALL COUNTY LINE Length: 1.71

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 426,303 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $341,042

State $85,261

Other $0

Total $426,303

Project: M005227 Type Work: Bridges
Descp:I-85 @ 9 LOCS & I-985 @ 6 LOCS - BRIDGE PRESERVATION Length: 0.00

Phase PE CST

Fund IM NHPP

Year 2014 LUMP

Federal $40,500
$1,376,779

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,574,754 $ 45,000 0

Project Details: Painting steel superstructure on State Freight Network
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $4,500
$152,975

Other $0 $0

Total $45,000
$1,529,754

Also in Franklin, Gwinnett, Hall County

230

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Jackson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007176 0007176 0007177 0007177 0007177 0011677 0011677 110630121340122150122150-

Year
2018 2018 2017 2018 2018 2016 2017 2018 2016 2016 2016

Phase
ROW UTL ROW CST UTL ROW CST PE CST CST UTL

Fund
STP STP STP STP STP STP STP NHPP NHPP NHPP NHPP

Federal
$107,903 $235,926
$84,908 $5,967,348
$136,327 $114,860 $505,610 $353,306 $2,084,404 $9,550,506 $200,149

State
$26,976 $58,981 $21,227 $1,491,837 $34,082 $28,715 $126,403 $88,326 $521,101 $2,387,626 $50,037

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total
$134,878 $294,907 $106,135 $7,459,185 $170,408 $143,575 $632,013 $441,632 $2,605,505 $11,938,132 $250,186

$19,341,245

$4,835,311

$0

$24,176,557

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

231

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Jasper

Project: 0001939 Type Work: New Construction Descp:MONTICELLO NE BYPASS FM SR 16 TO SR 83 Lanes: Exist. 0 Prop. 2 Length: 3.28

Phase ROW CST

Fund STP STP

Year

Federal

2015

$1,244,400

After 2018 $10,977,804

State $311,100 $2,744,451

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,277,755 $0 12

Project Details: New location of a 2 lane bypass - Improve mobility & connectivity enhance economic development
opportunities

Other $0 $0

Total $1,555,500 $13,722,255

Project: 0004444 Type Work: Guardrail
Descp:SR 212 @ LAKE JACKSON GUARDRAIL @ APPROACHES Length: 0.40

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 348,145 $0 6

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $179,046 $169,099

State $0 $0

Other $0 $0

Total $179,046 $169,099

Also in Newton County

Project: 0007593 Type Work: Sidewalks
Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN MONTICELLO Length: 0.95

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 516,102 $ 12,500 21

Phase ROW CST CST

Fund Local HPP Local

Year 2014 2015 2015

Federal $0
$329,950 $0

State $0 $0 $0

Other $12,500 $138,052 $35,600

Total $12,500
$468,002 $35,600

Project: 0010670 Type Work: TE-Rehab Hist Trans Bldg
Descp:SEVEN ISLANDS ROAD INTERPRETATIVE MUSEUM & VISITORS CENTER Length: 0.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 312,500 $0 1

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $250,000

State $0

Other $62,500

Total $312,500

232

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 231730- Type Work: Passing Lanes
Descp:SR 83 FM N OF CR 73 TO S OF CR 77 & CR 144 TO S OF CR 133
Lanes: Exist. 2 Prop. 3 Length: 2.48

Phase PE CST CST

Fund STP STP Bond

Year 2014 2015 2015

Federal $242,024 $64,917 $0

State $60,506 $16,229 $3,501,851

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,885,526 $ 3,885,526 18

Project Details: Project will improve passing opportunities along the corridor for motorist and address operational
and safety issues at key locations.

Project: M005021 Type Work: Resurface & Maintenance Descp:SR 212 FROM SR 16 TO PUTNAM COUNTY LINE
Length: 9.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,566,158 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,052,927

State $513,232

Other $0 $0 $0
Other $0

Total $302,529
$81,146 $3,501,851
Total $2,566,158

Project: M005039 Type Work: Resurface & Maintenance Descp:SR 11 SO FROM SR 11 TO SR 11
Length: 0.11

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 18,350 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $14,680

State $3,670

Other $0

Total $18,350

Project: M005150 Type Work: Resurface & Maintenance Descp:SR 83 FROM MONROE COUNTY LINE TO SR 16
Length: 13.71

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,287,126 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,829,701

State $457,425

Other $0

Total $2,287,126

233

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Jasper Totals Summary
County Summary excludes lump sum projects.

Project PI#
0001939 0007593 0007593 231730231730-

Year
2015 2015 2015 2015 2015

Phase
ROW CST CST CST CST

Fund
STP Local HPP Bond STP

Federal
$1,244,400 $0
$329,950 $0
$64,917

State
$311,100 $0 $0
$3,501,851 $16,229

Other
$0 $35,600 $138,052
$0 $0

Total
$1,555,500 $35,600
$468,002 $3,501,851
$81,146

$1,639,267

$3,829,180

$173,652

$5,642,099

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

234

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Jeff Davis

Project: 0001810 Type Work: Railroad Crossing
Descp:SR 19/US 23 OVERPASS @ NORFOLK-SOUTHERN RR GRADE CROSSING Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,593,779 $0 0

Phase PE
ROW CST

Fund STP STP STP

Year 2015 2017 After 2018

Federal $176,000 $494,947
$2,204,076

State $44,000 $123,737 $551,019

Other $0 $0 $0

Total $220,000 $618,684 $2,755,095

Project: 0007037 Type Work: Replace Bridge Descp:SR 135 @ ALTAMAHA RIVER - TIA

Length: 0.60

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,441,627 $ 1,740,833 0

Phase PE
ROW CST CST

Fund STP STP State STP

Year 2017 2017 2014 After 2018

Federal $8,000
$42,448 $0
$5,310,187

State $2,000
$10,612 $0
$1,327,547

Other $0 $0
$1,740,833 $0

Total $10,000 $53,060
$1,740,833 $6,637,734

Also in Montgomery County

Project: 0009876 Type Work: Roundabout Descp:SR 107 @ SR 268
Length: 1.00

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $165,612 $938,469

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,104,081 $0 0

Project Details: Project will improve the capacity and operations of the intersection to enhance mobility.
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

State $0 $0

Other $0 $0

Total $165,612 $938,469

Project: 533176- Type Work: Replace Bridge Descp:SR 135 @ WHITEHEAD CREEK 1 MI OF DENTON

Length: 0.61

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,951,619 $ 210,000 7

Phase ROW CST

Fund STP STP

Year 2014 2015

Federal $168,000
$2,993,295

State $42,000 $748,324

Other $0 $0

Total $210,000 $3,741,619

Project: M004554 Type Work: Resurface & Maintenance
Descp:SR 268 FROM COFFEE COUNTY LINE TO 0.02 MI E OF SR 107 Length: 8.12

Phase CST

Fund STP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,158,590 $ 1,158,590 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $926,872

State $231,718

Other $0

Total $1,158,590

235

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004595 Type Work: Resurface & Maintenance
Descp:SR 135 CONN FROM SR 19 TO 0.01 MI E OF SR 135 IN HAZLEHURST Length: 0.70

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 271,361 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $217,089

State $54,272

Other $0

Total $271,361

Project: M004600 Type Work: Resurface & Maintenance Descp:SR 107 FROM COFFEE COUNTY LINE TO SR 135
Length: 8.77

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,399,303 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,119,442

State $279,861

Other $0

Total $1,399,303

Project: M005170 Type Work: Resurface & Maintenance
Descp:SR 19 FROM BACON COUNTY LINE TO SR 135 CONN Length: 10.96

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,264,475 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,811,580

State $452,895

Other $0

Total $2,264,475

Also in Appling County

Jeff Davis Totals Summary
County Summary excludes lump sum projects.

Project PI#
0001810 0001810 0007037 0007037 533176-

Year
2015 2017 2017 2017 2015

Phase
PE ROW
PE ROW CST

Fund
STP STP STP STP STP

Federal
$176,000 $494,947
$4,000 $21,224 $2,993,295

State
$44,000 $123,737
$1,000 $5,306 $748,324

Other
$0 $0 $0 $0 $0

Total
$220,000 $618,684
$5,000 $26,530 $3,741,619

$3,689,467

$922,367

$0

$4,611,834

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

236

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Jefferson

Project: 0013258 Type Work: Pedestrian Crossings
Descp:SR 4; SR 17 & SR 24 @ 4 LOCS - PEDESTRIAN UPGRADES Length: 1.60

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 636,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $122,400 $450,000

State $13,600 $50,000

Other $0 $0

Total $136,000 $500,000

Also in Burke, McDuffie County

Project: 0013262 Type Work: RRX Consolidation
Descp:CS 632/BETHEA STREET @ NS #732762B IN WADLEY Length: 0.40

Phase CST

Fund STP

Year 2015

Federal $7,500

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,500 $0 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018

State $0

Other $0

Total $7,500

Project: 222120- Type Work: Widening
Descp:SR 4/US 1 FM WADLEY BYPASS TO LOUISV'LE BYP/INCL BRIDGES
Lanes: Exist. 2 Prop. 4 Length: 6.53

Phase ROW CST

Fund NHPP NHPP

Year 2018 After 2018

Federal $4,637,014 $24,511,258

State $1,159,254 $6,127,815

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 36,435,341 $0 60

Project Details: Provide additional capacity - improve mobility and reduce congestion - enhance economic
development - reduce crash frequency - State Freight Network

Other $0 $0

Total $5,796,268 $30,639,073

Project: 222150- Type Work: Widening
Descp:SR 4/US 1/LOUISVILLE BYP FM SR 4 BU/US 1BU TO CR 325 - TIA
Lanes: Exist. 2 Prop. 4 Length: 2.54

Phase ROW CST CST

Fund NHPP State NHPP

Year 2015 2014 2017

Federal $888,460 $0
$13,691,215

State $222,115
$0 $3,422,804

Other $0
$5,975,463 $0

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 24,200,057 $ 5,975,463 106

Project Details: Provide additional capacity - improve mobility and reduce congestion - enhance economic
development - reduce crash frequency - State Freight Network

Total $1,110,575 $5,975,463 $17,114,018

237

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 222160- Type Work: Widening
Descp:SR 4/US 1 FM LOUISVILLE BYP @ CR 325 TO CR 138/MENNONITE CH
Lanes: Exist. 2 Prop. 4 Length: 5.80

Phase ROW CST

Fund NHPP NHPP

Year

Federal

2018

$4,777,613

After 2018 $20,248,566

State $1,194,403 $5,062,141

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 31,282,724 $0 65

Project Details: Widen 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development - Project on GRIP corridor & State Freight
Network if on GRIP/FN

Project: 222170- Type Work: Widening
Descp:SR 4/US 1 FM CR 138 NORTH TO SR 88/FALL LINE FREEWAY
Lanes: Exist. 2 Prop. 4 Length: 6.70

Phase ROW CST

Fund NHPP NHPP

Year

Federal

2018

$6,821,493

After 2018 $45,435,523

State $1,705,373 $11,358,881

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 65,321,270 $0 65

Project Details: Provide additional capacity - improve mobility and reduce congestion - enhance economic
development - reduce crash frequency - State Freight Network

Project: 232265- Type Work: Replace Bridge Descp:SR 4/US 1 @ BIG CREEK 9 MI N OF LOUISVILLE

Lanes: Exist. 2 Prop. 4 Length: 0.22

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,345,218 $0 0

Phase PE CST

Fund NHPP NHPP

Year 2016 After 2018

Federal $292,800
$1,583,375

State $73,200 $395,844

Other $0 $0

Total $5,972,017 $25,310,707

Other $0 $0

Total $8,526,866 $56,794,404

Other $0 $0

Total $366,000 $1,979,218

Project: M004976 Type Work: Resurface & Maintenance Descp:SR 4BU FROM SR 4 TO SR 4 IN LOUISVILLE
Length: 2.76

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 464,835 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $371,868

State $92,967

Other $0

Total $464,835

Project: M005130 Type Work: Resurface & Maintenance
Descp:SR 4BU FM SR 4 S OF WADLEY CITY TO SR 4 N OF WADLEY CITY Length: 3.60

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,352,051 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,081,641

State $270,410

Other $0

Total $1,352,051

238

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005145 Type Work: Resurface & Maintenance
Descp:SR 4 FROM SR 4BU/KENNEDY ROAD TO N OF SR 4BU/MAIN STREET Length: 3.60

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,986,703 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,589,363

State $397,341

Other $0

Total $1,986,703

Project: M005151 Type Work: Resurface & Maintenance
Descp:SR 24 FROM SR 4BU TO WASHINGTON COUNTY LINE Length: 8.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,571,249 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,256,999

State $314,250

Other $0

Total $1,571,249

Project: M005152 Type Work: Resurface & Maintenance Descp:SR 88 FROM SR 80 TO BURKE COUNTY LINE
Length: 9.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,256,531 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,805,225

State $451,306

Other $0

Total $2,256,531

Project: M005202 Type Work: Resurface & Maintenance Descp:SR 80 FROM SR 17 TO SR 296
Length: 2.80

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 804,787 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $643,830

State $160,957

Other $0

Total $804,787

239

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Jefferson Totals Summary
County Summary excludes lump sum projects.

Project PI#
222120222150222150222160222170232265-

Year
2018 2015 2017 2018 2018 2016

Phase
ROW ROW CST ROW ROW
PE

Fund
NHPP NHPP NHPP NHPP NHPP NHPP

Federal
$4,637,014 $888,460
$13,691,215 $4,777,613 $6,821,493 $292,800

State
$1,159,254 $222,115
$3,422,804 $1,194,403 $1,705,373
$73,200

Other
$0 $0 $0 $0 $0 $0

Total
$5,796,268 $1,110,575 $17,114,018 $5,972,017 $8,526,866
$366,000

$31,108,596

$7,777,149

$0

$38,885,744

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

240

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Jenkins

Project: 0006319 Type Work: Replace Bridge
Descp:CR 200/OLD SAVANNAH ROAD @ SCULLS CREEK 5.3 MI S OF MILLEN Length: 0.47

Phase PE
ROW CST

Fund STP Local STP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,450,226 $ 171,160 5

Year 2014 2014 2015

Federal $8,000 $0
$1,023,253

State $2,000 $0
$255,813

Other $0
$161,160 $0

Total $10,000
$161,160 $1,279,066

Project: 0010716 Type Work: TE-Bike/Ped Facility
Descp:MILLEN DOWNTOWN STREETSCAPE/GREENSPACE PRESERVATION @ Length: 0.92

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,250,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $1,000,000

State $0

Other $250,000

Total $1,250,000

Project: 0011756 Type Work: Scenic Hwy Program
Descp:MILLEN-JENKINS COUNTY SCENIC BYWAY INTERPRETIVE VISTOR CTR Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 834,680 $ 15,000 0

Phase PE CST

Fund Byways Byways

Year 2014 2016

Federal $12,000
$655,744

State $0 $0

Other $3,000
$163,936

Total $15,000
$819,680

Jenkins Totals Summary
County Summary excludes lump sum projects.

Project PI#
0006319 0011756

Year
2015 2016

Phase
CST CST

Fund
STP Byways

Federal
$1,023,253 $655,744

State
$255,813 $0

Other
$0 $163,936

Total
$1,279,066 $819,680

$1,678,997

$255,813

$163,936

$2,098,746

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

241

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Johnson

Project: 0007178 Type Work: Replace Bridge Descp:SR 171 @ HOLTEN CREEK 0.6 MI S OF KITE

Length: 0.32

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,688,173 $0 5

Phase ROW CST

Fund STP STP

Year 2015 2017

Federal $116,688
$1,233,850

State $29,172 $308,463

Other $0 $0

Total $145,860 $1,542,313

Project: 0007180 Type Work: Replace Bridge
Descp:SR 171 @ LITTLE OHOOPEE RIVER 2.7 MI N OF KITE Length: 0.18

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,904,180 $0 3

Phase ROW CST

Fund STP STP

Year 2015 2017

Federal $113,424
$1,409,920

State $28,356 $352,480

Other $0 $0

Total $141,780 $1,762,400

Project: M005203 Type Work: Resurface & Maintenance
Descp:SR 15 FM WRIGHTSVILLE CITY LIMITS TO WASHINGTON COUNTY LINE Length: 5.01

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,536,001 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,228,800

State $307,200

Other $0

Total $1,536,001

Johnson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007178 0007178 0007180 0007180

Year
2015 2017 2015 2017

Phase
ROW CST ROW CST

Fund
STP STP STP STP

Federal
$116,688 $1,233,850
$113,424 $1,409,920

State
$29,172 $308,463
$28,356 $352,480

Other
$0 $0 $0 $0

Total
$145,860 $1,542,313
$141,780 $1,762,400

$2,873,882

$718,471

$0

$3,592,353

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

242

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Jones

Project: 0010671 Type Work: TE-Bike/Ped Facility Descp:JONES COUNTY TRAILS @ 6 LOCS - PHASE II
Length: 2.93

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 814,000 $0 12

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $651,200

State $0

Other $162,800

Project: 370860- Type Work: Replace Bridge Descp:CR 28 @ CHEHAW CREEK W OF CLINTON
Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $814,000
Total $102,000
$10,824 $510,000
$10,200

Project: M005066 Type Work: Resurface & Maintenance
Descp:SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE Length: 14.11

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,165,784 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $4,932,627

State $1,233,157

Other $0

Total $6,165,784

Project PI# 370860-

Year 2016

Jones Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

ROW

Local

$0

$0

$10,824

Total $10,824

$0

$0

$10,824

$10,824

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

243

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Lamar

Project: 371173- Type Work: Replace Bridge
Descp:CR 219/RUFFIN ROAD @ POTATO CREEK IN PIEDMONT Length: 0.22

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $300,000
$10,824 $510,000
$10,200

Project: M005001 Type Work: Resurface & Maintenance
Descp:SR 18 FROM E BARNESVILLE BYPASS/LAMAR TO W OF SR 83/MONROE Length: 10.75

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,164,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $931,200

State $232,800

Other $0

Total $1,164,000

Also in Monroe County

Project: M005045 Type Work: Resurface & Maintenance
Descp:SR 7 FROM CS 600/REDBUD DRIVE TO CR 322/MEADOVISTA ROAD Length: 14.46

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,564,550 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $5,251,640

State $1,312,910

Other $0

Total $6,564,550

Also in Pike, Spalding County

Lamar Totals Summary
County Summary excludes lump sum projects.

Project PI# 371173-

Year 2016

Phase ROW

Fund Local

Federal $0

State $0

Other $10,824

Total $10,824

$0

$0

$10,824

$10,824

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

244

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Lanier

Project: 0007181 Type Work: Replace Bridge
Descp:SR 64 @ TEN MILE CREEK 6.5 MI NORTHWEST OF LAKELAND Length: 0.27

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,359,865 $0 4

Phase ROW CST

Fund STP STP

Year 2015 2017

Federal $374,544
$1,513,348

State $93,636 $378,337

Other $0 $0

Total $468,180 $1,891,685

Project: 0007182 Type Work: Replace Bridge
Descp:SR 64 @ FIVE MILE CREEK 5 MI NORTH OF LAKELAND Length: 0.14

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,080,103 $0 4

Phase ROW CST

Fund STP STP

Year 2015 2017

Federal $511,632
$1,152,450

State $127,908 $288,113

Other $0 $0

Total $639,540 $1,440,563

Project: 0010589 Type Work: TE-Bike/Ped Facility
Descp:SR 135 FROM CR 47/SIMPSON AVE TO CR 324/BURNT CHURCH ROAD Length: 7.02

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 312,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $250,000

State $0

Other $62,500

Total $312,500

Project: M005095 Type Work: Resurface & Maintenance
Descp:SR 11 FROM SR 94/ECHOLS COUNTY TO SR 38/LANIER COUNTY Length: 16.56

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,046,278 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,437,022

State $609,256

Other $0

Total $3,046,278

Also in Echols County

Project: M005123 Type Work: Resurface & Maintenance
Descp:SR 11/US 129 FROM SR 37 TO BERRIEN COUNTY LINE Length: 8.27

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,169,400 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,535,520

State $633,880

Other $0

Total $3,169,400

245

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project PI#
0007181 0007181 0007182 0007182

Year
2015 2017 2015 2017

Lanier Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

ROW

STP

$374,544

$93,636

$0

CST

STP

$1,513,348

$378,337

$0

ROW

STP

$511,632

$127,908

$0

CST

STP

$1,152,450

$288,113

$0

Total
$468,180 $1,891,685
$639,540 $1,440,563

$3,551,975

$887,994

$0

$4,439,968

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

246

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Laurens

Project: 0000833 Type Work: Bridges
Descp:NEW OCONEE RVR X'ING FM COUNTRY CLUB TO BLACKSHEAR&FERRY-TIA
Lanes: Exist. 0 Prop. 2 Length: 2.60

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,098,729 $ 8,055,681 21

Phase PE
ROW CST CST

Fund State Local State STP

Year 2014 2014 2014 2015

Federal $0 $0 $0
$3,234,438

State $0 $0 $0
$808,610

Other $220,000 $514,080 $7,321,601
$0

Total $220,000 $514,080 $7,321,601 $4,043,048

Project: 0013177 Type Work: RRX Warning Device Descp:CR 531/MINTER TWEED ROAD @ GCR #641032A
Length: 0.40

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 205,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $5,000
$200,000

State $0 $0

Other $0 $0

Total $5,000
$200,000

Project: 262027- Type Work: Widening
Descp:SR 31/US 441 FROM S OF SR 117 TO CR 354/PINEHILL ROAD
Lanes: Exist. 2 Prop. 4 Length: 4.00

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year

Federal

2017

$8,059,238

After 2018 $15,393,268

After 2018 $1,670,011

State $2,014,810 $3,848,317
$417,503

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 31,403,145 $0 68

Project Details: Widen from 2 to 4 lanes- provide additional capacity to improve mobility and reduce congestion -
enhance economic development and reduce crash frequency- on the statewide freight corridor

Project: 270724- Type Work: Replace Bridge
Descp:CR 421/CHAPELL MILL ROAD @ TURKEY CREEK N OF MONTROSE Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0 $0 $0

Total $10,074,048 $19,241,585
$2,087,513

Other $0
$10,824 $0 $0

Total $300,000
$10,824 $510,000
$10,200

Project: 270725- Type Work: Replace Bridge Descp:CR 264 @ LIME SINK CREEK SE OF CADWELL

Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $300,000
$10,824 $510,000
$10,200

247

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 270746- Type Work: Replace Bridge Descp:CR 423 NW OF DUBLIN @ SANDY CREEK

Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $300,000
$10,824 $510,000
$10,200

Project: M004189 Type Work: Signing
Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,700,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Project: M004704 Type Work: Resurface & Maintenance Descp:SR 31/US 319 FROM I-16 TO SR 26
Length: 4.43

Phase CST

Fund NHPP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,632,256 $ 1,632,256 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,700,000
Federal $1,305,805

State $0

Other $0

Total $1,700,000

Also in Bleckley, Emanuel, Treutlen County

State $326,451

Other $0

Total $1,632,256

Project: M004705 Type Work: Resurface & Maintenance
Descp:SR 257 FROM 0.04 MI N OF CS 493/INDUSTRIAL BLVD TO SR 31 Length: 1.78

Phase CST

Fund STP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 422,592 $ 422,592 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $338,073

State $84,518

Other $0

Total $422,592

Project: M004889 Type Work: Resurface & Maintenance
Descp:SR 29 FROM SR 26 TO CR 471/ED SWINSON ROAD Length: 5.37

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,263,767 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,811,014

State $452,753

Other $0

Total $2,263,767

248

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005081 Type Work: Resurface & Maintenance Descp:SR 257 FROM CS 581/N ALPHA STREET TO I-16
Length: 6.85

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 841,990 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $673,592

State $168,398

Other $0

Total $841,990

Laurens Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000833 262027270724270725270746-

Year
2015 2017 2016 2016 2016

Phase
CST ROW ROW ROW ROW

Fund
STP NHPP Local Local Local

Federal
$3,234,438 $8,059,238
$0 $0 $0

State
$808,610 $2,014,810
$0 $0 $0

Other
$0 $0 $10,824 $10,824 $10,824

Total
$4,043,048 $10,074,048
$10,824 $10,824 $10,824

$11,293,676

$2,823,419

$32,473

$14,149,568

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

249

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Lee

Project: 0009264 Type Work: Miscellaneous Improvements
Descp:LEESBURG TRAIN DEPOT - RENOVATION & PRESERVATION Length: 0.00

Phase Fund CST Other Funds

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 292,078 $0 0

Federal $233,662

State $58,416

Other $0

Total $292,078

Project: 0009865 Type Work: Replace Bridge Descp:SR 118 @ MUCKALOOCHEE CREEK

Length: 0.17

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,269,771 $ 120,000 5

Phase ROW CST

Fund Bridge STP

Year 2014 2015

Federal $96,000
$919,817

State $24,000 $229,954

Other $0 $0

Total $120,000 $1,149,771

Project: M004432 Type Work: Bridge Painting
Descp:SR 93 @ LITTLE TIRED CREEK TRIB & SR 195 @ MUCKALEE CREEK Length: 0.80

Phase PE CST

Fund STP STP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 204,000 $0 0

Project Details: Bridge painting and remove lead based paint system
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Federal $3,200
$160,000

State $800
$40,000

Other $0 $0

Total $4,000
$200,000

Also in Grady County

Project: M004804 Type Work: Resurface & Maintenance
Descp:SR 118 FROM KINCHAFOONEE CREEK TO SUMTER COUNTY Length: 11.63

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,800,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,440,000

State $360,000

Other $0

Total $1,800,000

Project PI#

Lee Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Year

Phase

Fund

Federal

State

Other

Total

0009264 0009865

2015 2015

CST

Other Funds

CST

STP

$233,662 $919,817

$58,416 $229,954

$0

$292,078

$0

$1,149,771

$1,153,479

$288,370

$0

$1,441,848

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

250

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Lincoln

Project: 0007040 Type Work: Replace Bridge
Descp:SR 43 @ LITTLE RIVER @ LINCOLN/MCDUFFIE COUNTY LINE Length: 0.65

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,703,109 $0 2

Phase CST UTL

Fund Bond STP

Year 2015 2015

Federal $0
$311,307

State $8,313,974
$77,827

Other $0 $0

Total $8,313,974
$389,134

Also in McDuffie County

Project: 0010413 Type Work: Replace Bridge Descp:SR 43 @ SOAP CREEK 4 MI E OF LINCOLNTON

Length: 0.56

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,740,349 $0 4

Phase ROW CST

Fund STP STP

Year 2015 2017

Federal $97,920
$3,694,360

State $24,480 $923,590

Other $0 $0

Total $122,400 $4,617,949

Project: 0010698 Type Work: TE-Bike/Ped Facility
Descp:LINCOLNTON DOWNTOWN STREETSCAPES @ 5 LOCS - PHASE III Length: 0.98

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 281,250 $0 1

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $225,000

State $0

Other $56,250

Total $281,250

Project: M004701 Type Work: Resurface & Maintenance

Phase

CST

Descp:SR 44 FROM SR 17BU/WILKES TO SR 79/LINCOLN

Length: 15.23

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,103,780 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,483,024

State $620,756

Other $0

Total $3,103,780

Also in Wilkes County

251

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Lincoln Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007040 0007040 0010413 0010413

Year
2015 2015 2015 2017

Phase
CST UTL ROW CST

Fund
Bond STP STP STP

Federal
$0 $155,654
$97,920 $3,694,360

State
$4,156,987 $38,913 $24,480
$923,590

Other
$0 $0 $0 $0

Total
$4,156,987 $194,567 $122,400
$4,617,949

$3,947,933

$5,143,971

$0

$9,091,904

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

252

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Long

Project: M004593 Type Work: Resurface & Maintenance
Descp:SR 38/US 84 FROM SR 57/LONG TO 0.04 MI W OF SR 119/LIBERTY Length: 7.79

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,813,821 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $3,051,057

State $762,764

Other $0

Total $3,813,821

Also in Liberty County

Project: M005008 Type Work: Resurface & Maintenance
Descp:SR 23 FROM LUDOWICI CITY LIMITS TO TATTNALL COUNTY LINE Length: 14.65

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,275,424 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $4,220,340

State $1,055,085

Other $0

Total $5,275,424

Project: M005171 Type Work: Resurface & Maintenance Descp:SR 144 FROM TATTNALL COUNTY LINE TO SR 119

Phase CST

Length: 15.88

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,299,070 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,639,256

State $659,814

Other $0

Total $3,299,070

Also in Liberty County

253

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Lumpkin

Project: 0007495 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 19 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,369,911 $ 580,000 18

Phase PE
ROW CST UTL

Fund HSIP HSIP HSIP HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Project: 0008912 Type Work: Streetscapes
Descp:DOWNTOWN DEVELOPMENT AUTHORITY DIST STREETSCAPE IN DAHLONEGA Length: 0.10

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,256,070 $0 4

Phase ROW CST CST UTL

Fund Local HPP Local Local

Year 2014 2014 LUMP LUMP
Year LOCL 2015 2015 2015

Federal $18,000
$504,000 $2,429,920
$81,000
Federal $0
$40,553 $0 $0

State $2,000
$56,000 $269,991
$9,000

Other $0 $0 $0 $0

Total $20,000
$560,000 $2,699,911
$90,000

Also in Towns, Union, White County

State $0 $0 $0 $0

Other $83,000
$0 $682,517 $450,000

Total $83,000 $40,553
$682,517 $450,000

Project: 0009104 Type Work: Bicycle/Ped. Facility
Descp:DOWNTOWN DAHLONEGA PEDESTRIAN & LANDSCAPE IMPROVEMENTS Length: 0.15

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 126,250 $0 0

Phase CST

Fund State

Year 2015

Federal $0

State $126,250

Other $0

Total $126,250

Project: 0009948 Type Work: Roundabout Descp:SR 52 @ SR 115/CR 41/COPPER MINE ROAD
Length: 0.26

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,698,369 $0 7

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $759,900 $938,469

State $0 $0

Other $0 $0

Project: 0009949 Type Work: Roundabout Descp:SR 9 @ SR 52
Length: 0.26

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,209,067 $0 4

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $289,000 $920,067

State $0 $0

Other $0 $0

Total $759,900 $938,469
Total $289,000 $920,067

254

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009950 Type Work: Roundabout Descp:SR 9 @ SR 60
Length: 0.26

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,559,649 $0 4

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $621,180 $938,469

State $0 $0

Other $0 $0

Total $621,180 $938,469

Project: 0010681 Type Work: TE-Bike/Ped Facility
Descp:SR 60 BU FROM CS 522/CHOICE ST TO CS 530/CHURCH ST Length: 0.20

Phase ROW CST UTL

Fund Local STP Local

Year LOCL LUMP LOCL

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,476,972 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $0
$500,000 $0

State $0 $0 $0

Other $253,000 $352,472 $371,500

Total $253,000 $852,472 $371,500

Project: M004996 Type Work: Bridges
Descp:SR 28; SR 52; SR 72 & SR 77 @ 4 LOCS - SCOUR REPAIR & REHAB Length: 1.20

Phase PE CST

Fund STP STP

Year 2014 LUMP

Federal $360,000
$1,680,000

State $90,000 $420,000

Other $0 $0

Total $450,000 $2,100,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,550,000 $ 450,000 0

Project Details: Painting steel superstructure - deck rehab - correct broken welds - joint replacement - spall repairs
on State Freight Network on GRIP network
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Also in Elbert, Hart, Rabun County

Project: M005201 Type Work: Resurface & Maintenance
Descp:SR 60 FROM CR 179/LODGE DRIVE/HALL TO SR 9/LUMPKIN Length: 10.19

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,693,578 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,354,862

State $338,716

Other $0

Total $1,693,578

Also in Hall County

255

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005214 Type Work: Resurface & Maintenance Descp:SR 60 FROM SR 9 TO UNION COUNTY LINE
Length: 5.33

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 885,846 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $708,677

State $177,169

Other $0

Total $885,846

Lumpkin Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008912 0008912 0008912 0009104

Year
2015 2015 2015 2015

Phase
CST CST UTL CST

Fund
Local HPP Local State

Federal
$0 $40,553
$0 $0

State
$0 $0 $0 $126,250

Other
$682,517 $0
$450,000 $0

Total
$682,517 $40,553
$450,000 $126,250

$40,553

$126,250

$1,132,517

$1,299,320

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

256

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Macon

Project: 0007042 Type Work: Replace Bridge
Descp:SR 128 @ WHITEWATER CREEK 4 MI N OF OGLETHORPE - TIA Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,422,762 $ 2,500,000 0

Phase PE
ROW CST CST UTL

Fund State STP State STP STP

Year 2014 2017 2014 2018 2018

Federal $0
$118,799 $0
$2,040,682 $178,728

State $0
$29,700 $0
$510,171 $44,682

Other $500,000
$0 $2,000,000
$0 $0

Total $500,000 $148,499 $2,000,000 $2,550,853 $223,410

Project: 0007594 Type Work: Sidewalks
Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN MONTEZUMA Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 222,500 $0 0

Phase CST

Fund HPP

Year 2018

Federal $178,000

State $0

Other $44,500

Total $222,500

Project: 0010603 Type Work: TE-Bike/Ped Facility
Descp:SR 26 & SR 49 FM CR 15/CLIFTON BRADLEY DRIVE TO FLINT RIVER Length: 1.81

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $300,000

State $0

Other $75,000

Total $375,000

Project: M004974 Type Work: Resurface & Maintenance Descp:SR 329 FROM SR 26/MACON TO SR 230/DOOLY
Length: 9.45

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 829,727 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $663,782

State $165,945

Other $0

Total $829,727

Also in Dooly County

Project: M005070 Type Work: Resurface & Maintenance
Descp:SR 26 FROM CS 603/STAGECOACH ROAD/MACON TO SR 7/HOUSTON Length: 17.41

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,362,946 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,690,357

State $672,589

Other $0

Total $3,362,946

Also in Houston County

257

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005073 Type Work: Resurface & Maintenance Descp:SR 26 FROM SCHLEY COUNTY LINE TO SR 49
Length: 8.81

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 966,882 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $773,506

State $193,376

Other $0

Total $966,882

Project: M005086 Type Work: Resurface & Maintenance Descp:SR 128 FROM SR 90 TO TAYLOR COUNTY LINE
Length: 13.44

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,416,038 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,132,830

State $283,208

Other $0

Total $1,416,038

Project: M005087 Type Work: Resurface & Maintenance Descp:SR 49 FROM SR 90 TO SR 127
Length: 13.56

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,869,370 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $3,095,496

State $773,874

Other $0

Total $3,869,370

Project: M005188 Type Work: Resurface & Maintenance
Descp:SR 49 FM SUMTER COUNTY LINE TO N OF CS 577/N RANDOLPH STREET Length: 8.70

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 51,822 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $41,458

State $10,364

Other $0

Total $51,822

258

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Macon Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007042 0007042 0007042 0007594

Year
2017 2018 2018 2018

Phase
ROW CST UTL CST

Fund
STP STP STP HPP

Federal
$118,799 $2,040,682
$178,728 $178,000

State
$29,700 $510,171
$44,682 $0

Other
$0 $0 $0 $44,500

Total
$148,499 $2,550,853
$223,410 $222,500

$2,516,209

$584,552

$44,500

$3,145,262

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

259

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Madison

Project: 122650- Type Work: Widening
Descp:SR 72 FM WEST CITY LIMITS OF COMER TO E OF BROAD RVR/ELBERT
Lanes: Exist. 2 Prop. 4 Length: 9.33

Phase PE CST CST

Fund NHPP NHPP Bond

Year 2015 2015 2015

Federal $104,000
$1,079,729 $0

State $26,000 $269,932 $55,573,560

Other $0 $0 $0

Total $130,000 $1,349,661 $55,573,560

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 57,053,221 $ 56,923,221 0

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development - Project on GRIP corridor & State Freight
Network

Also in Elbert County

Project: M003887 Type Work: Resurface & Maintenance
Descp:SR 72 FROM W OF COMER CITY LIMIT TO W OF CR 287/RIVER ROAD Length: 9.44

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,116,155 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,692,924

State $423,231

Other $0

Total $2,116,155

Project: M005175 Type Work: Resurface & Maintenance
Descp:SR 22 FROM OGLETHORPE COUNTY LINE TO SR 72 Length: 1.23

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 272,571 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $218,057

State $54,514

Other $0

Total $272,571

Project PI#
122650122650122650-

Year
2015 2015 2015

Madison Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

PE

NHPP

$101,920

$25,480

$0

CST

Bond

$0

$54,462,088

$0

CST

NHPP

$1,058,134

$264,534

$0

Total
$127,400 $54,462,088
$1,322,668

$1,160,054

$54,752,102

$0

$55,912,156

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

260

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Marion

Project: 0008647 Type Work: Replace Bridge
Descp:CR 99/BOB SAVEL ROAD @ LANAHASSEE CREEK TRIBUTARY Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $102,000
$10,824 $510,000
$10,200

Project: 371120- Type Work: Replace Bridge
Descp:CR 7/WALTER WELLS ROAD @ SHOAL CREEK NW TAZEWELL CL Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $102,000
$10,824 $510,000
$10,200

Project: M005018 Type Work: Resurface & Maintenance Descp:SR 240 CONN FROM SR 127 TO SR 240
Length: 1.92

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 177,005 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $141,604

State $35,401

Other $0

Total $177,005

Project: M005074 Type Work: Resurface & Maintenance
Descp:SR 26 FROM CHATTAHOOCHEE COUNTY LINE TO SR 3 Length: 23.27

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,801,340 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $3,841,072

State $960,268

Other $0

Total $4,801,340

Also in Schley County

Project: M005176 Type Work: Resurface & Maintenance Descp:SR 137 FROM SR 355 TO SR 41
Length: 8.10

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,427,968 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,142,374

State $285,594

Other $0

Total $1,427,968

261

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005189 Type Work: Resurface & Maintenance
Descp:SR 41 FM N OF CS 532/INDUSTRIAL BLVD/MARION TO SR 22/TALBOT Length: 17.61

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,087,313 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,669,850

State $417,463

Other $0

Total $2,087,313

Also in Talbot County

Project: M005224 Type Work: Resurface & Maintenance Descp:SR 137 SPUR FROM SR 137 TO SR 355
Length: 1.59

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 139,605 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $111,684

State $27,921

Other $0

Total $139,605

Marion Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008647 371120-

Year
2016 2016

Phase
ROW ROW

Fund
Local Local

Federal
$0 $0

State
$0 $0

Other
$10,824 $10,824

Total
$10,824 $10,824

$0

$0

$21,649

$21,649

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

262

STATE TRANSPORTATION IMPROVEMENT PROGRAM

McDuffie

Project: 0007040 Type Work: Replace Bridge
Descp:SR 43 @ LITTLE RIVER @ LINCOLN/MCDUFFIE COUNTY LINE Length: 0.65

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,703,109 $0 2

Phase CST UTL

Fund Bond STP

Year 2015 2015

Federal $0
$311,307

State $8,313,974
$77,827

Other $0 $0

Total $8,313,974
$389,134

Also in Lincoln County

Project: 0013258 Type Work: Pedestrian Crossings
Descp:SR 4; SR 17 & SR 24 @ 4 LOCS - PEDESTRIAN UPGRADES Length: 1.60

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 636,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $122,400 $450,000

State $13,600 $50,000

Other $0 $0

Total $136,000 $500,000

Also in Burke, Jefferson County

Project: 222250- Type Work: Widening
Descp:SR 10/SR 17/US 78 FROM SR 43 TO CR 6/SMITH MILL ROAD - TIA
Lanes: Exist. 2 Prop. 5 Length: 5.74

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 29,460,759 $ 4,344,832 58

Phase PE CST CST UTL

Fund NHPP State NHPP NHPP

Year 2014 2014 2015 2015

Federal $80,000 $0
$19,653,820 $438,922

State $20,000
$0 $4,913,455
$109,730

Other $0
$4,244,832 $0 $0

Project Details: Provide additional capacity - improve mobility and reduce congestion - enhance economic
development - reduce crash frequency - State Freight Network

Total $100,000 $4,244,832 $24,567,275 $548,652

Project: 222255- Type Work: Widening
Descp:SR 10/SR 17 FM SMITH MILL RD TO WASHINGTON BYP/WILKES - TIA
Lanes: Exist. 2 Prop. 4 Length: 12.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 38,105,012 $ 4,125,000 74

Phase PE CST CST UTL

Fund NHPP State NHPP NHPP

Year 2014 2014 2015 2015

Federal $100,000 $0
$25,534,418 $1,649,592

State $25,000
$0 $6,383,605
$412,398

Other $0
$4,000,000 $0 $0

Total $125,000 $4,000,000 $31,918,023 $2,061,990

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development - Project on GRIP corridor & State Freight
Network if on GRIP/FN

Also in Wilkes County

263

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 227815- Type Work: Replace Bridge
Descp:SR 10/17/US 78 @ HART CREEK 9.5 MI N OF THOMSON Length: 0.23

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 649,315 $ 10,000 0

Phase PE CST

Fund Bridge NHPP

Year 2014 2015

Federal $8,000
$511,452

State $2,000
$127,863

Other $0 $0

Total $10,000
$639,315

Project: 227816- Type Work: Replace Bridge Descp:SR 10/US 78 @ BIG CREEK 8 MI N OF THOMSON

Length: 0.24

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,451,834 $ 5,000 0

Phase PE CST

Fund Bridge NHPP

Year 2014 2015

Federal $4,000
$1,957,467

State $1,000
$489,367

Other $0 $0

Total $5,000
$2,446,834

Project: M004920 Type Work: Resurface & Maintenance
Descp:I-20 FROM SR 44/GREENE TO SR10/SR 17/MCDUFFIE Length: 41.95

Phase CST

Fund NHPP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,191,045 $ 8,191,045 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Project: M005040 Type Work: Resurface & Maintenance Descp:SR 12 FROM WARREN COUNTY LINE TO SR 10
Length: 5.90

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 367,904 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $7,371,941
Federal $294,323

State $819,105

Other $0

Total $8,191,045

Also in Greene, Taliaferro, Warren County

State $73,581

Other $0

Total $367,904

Project: M005042 Type Work: Resurface & Maintenance
Descp:SR 17 FROM JEFFERSON COUNTY LINE TO SR 12 Length: 13.60

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,089,664 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,671,731

State $417,933

Other $0

Total $2,089,664

Also in Warren County

264

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005108 Type Work: Bridges
Descp:SR 22 @ 2 LOCS IN BALDWIN CO & SR 150 @ 1 LOC IN MCDUFFIE CO Length: 1.20

Phase PE CST

Fund STP STP

Year 2014 LUMP

Federal $128,000 $600,000

State $32,000 $150,000

Other $0 $0

Total $160,000 $750,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 910,000 $ 160,000 0

Project Details: Substructure strengthening - deck rehab painting - joint replacement and co-polymer overlay
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Also in Baldwin County

Project: M005196 Type Work: Resurface & Maintenance
Descp:I-20 FROM SR 10/MCDUFFIE TO SR 383/COLUMBIA Length: 21.84

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 20,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $18,000

State $2,000

Other $0

Total $20,000

Also in Columbia County

McDuffie Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007040 0007040 222250222250222255222255227815227816-

Year
2015 2015 2015 2015 2015 2015 2015 2015

Phase
CST UTL CST UTL CST UTL CST CST

Fund
Bond STP NHPP NHPP NHPP NHPP NHPP NHPP

Federal
$0 $155,654 $19,653,820 $438,922 $6,638,949 $428,894 $511,452 $1,957,467

State
$4,156,987 $38,913
$4,913,455 $109,730
$1,659,737 $107,223 $127,863 $489,367

Other
$0 $0 $0 $0 $0 $0 $0 $0

Total
$4,156,987 $194,567
$24,567,275 $548,652
$8,298,686 $536,117 $639,315
$2,446,834

$29,785,156

$11,603,276

$0

$41,388,433

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

265

STATE TRANSPORTATION IMPROVEMENT PROGRAM

McIntosh

Project: 0010594 Type Work: TE-Bike/Ped Facility Descp:SR 25 FROM SR 251 TO DARIEN RIVER
Length: 1.53

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 187,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $150,000

State $0

Other $37,500

Total $187,500

Project: 0011713 Type Work: Lighting Descp:I-95 @ SR 57/SR 99 - INTERCHANGE LIGHTING
Length: 0.80

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,458,600 $0 0

Uses Lump Sum Bank: INTERCHANGE/ROADWAY LIGHTING FOR FY 2015 - FY 2018

Federal $146,880
$1,020,000

State $36,720 $255,000

Other $0 $0

Total $183,600 $1,275,000

Project: M004628 Type Work: Resurface & Maintenance
Descp:SR 25 FM SOUTH ALTAMAHA RIVER/GLYNN TO N OF SR 251/MCINTOSH Length: 4.59

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,008,620 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $806,896

State $201,724

Other $0

Total $1,008,620

Also in Glynn County

266

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Meriwether

Project: 0007043 Type Work: Replace Bridge Descp:SR 18 @ CSX RR

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,802,609 $ 554,628 0

Phase PE
ROW CST UTL

Fund Bridge STP STP STP

Year 2014 2017 After 2018 After 2018

Federal $443,702 $139,192
$6,123,540 $335,653

State $110,926 $34,798 $1,530,885 $83,913

Other $0 $0 $0 $0

Total $554,628 $173,990 $7,654,426 $419,566

Project: 0007044 Type Work: Replace Bridge
Descp:SR 85 @ CS 081117 LANE STREET IN MANCHESTER Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,639,713 $0 0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2016 2018 After 2018 After 2018

Federal $645,436 $170,371
$8,733,013 $562,950

State $161,359
$42,593 $2,183,253
$140,738

Other $0 $0 $0 $0

Total $806,795 $212,964 $10,916,266 $703,688

Project: 0010414 Type Work: Replace Bridge
Descp:SR 109 SPUR @ RED OAK CREEK 2 MI SW OF GAY Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,531,407 $0 4

Project Details: In State Freight Network.

Phase ROW CST UTL

Fund STP STP STP

Year 2016 2017 2017

Federal $102,375
$1,114,261 $8,490

State $25,594 $278,565
$2,122

Other $0 $0 $0

Total $127,969 $1,392,826
$10,612

Project: 0010618 Type Work: Bicycle/Ped. Facility
Descp:SR 18 SO/SR 41 SO; SR 109 & CS 799/DEPOT ST @ 3 LOCS - PH II Length: 0.18

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 0

Phase CST

Fund State

Year 2015

Federal $0

State $375,000

Other $0

Total $375,000

Project: M005138 Type Work: Resurface & Maintenance Descp:SR 41 FROM SR 85 TO SR 18
Length: 11.44

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,559,572 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $3,647,658

State $911,914

Other $0

Total $4,559,572

267

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005157 Type Work: Resurface & Maintenance Descp:SR 85 ALT FROM TALBOT COUNTY LINE TO SR 41

Phase CST

Length: 3.90

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,434,841 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,147,873

State $286,968

Other $0

Total $1,434,841

Meriwether Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007043 0007044 0007044 0010414 0010414 0010414 0010618

Year
2017 2016 2018 2016 2017 2017 2015

Phase
ROW PE
ROW ROW CST UTL CST

Fund
STP STP STP STP STP STP State

Federal
$139,192 $645,436 $170,371 $102,375 $1,114,261
$8,490 $0

State
$34,798 $161,359
$42,593 $25,594 $278,565
$2,122 $375,000

Other
$0 $0 $0 $0 $0 $0 $0

Total
$173,990 $806,795 $212,964 $127,969 $1,392,826
$10,612 $375,000

$2,180,126

$920,031

$0

$3,100,157

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

268

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Miller

Project: 0008667 Type Work: Drainage Improvements Descp:SR 1 @ 1 LOC & CS 500/CUTHBERT ST @ 1 LOC

Length: 0.68

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,301,704 $ 460,000 19

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2014 2015 2015

Federal $368,000 $632,155 $41,208

State $92,000 $158,039 $10,302

Other $0 $0 $0

Total $460,000 $790,194
$51,510

Project: 0009111 Type Work: TE-Bike/Ped Facility
Descp:MILFORD STREET/PHILLIPSBURG ROAD SIDEWALKS/WALKING LANE Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $400,000

State $0

Other $100,000

Total $500,000

Project: M005168 Type Work: Resurface & Maintenance
Descp:SR 1 FM 1.15 MI S OF CS 540/BROOKS ST TO 0.20 MI N OF SR 91 Length: 3.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 867,457 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $693,966

State $173,491

Other $0

Total $867,457

Project: M005193 Type Work: Resurface & Maintenance
Descp:SR 1 FROM DECATUR COUNTY LINE TO N OF CR 48/MIDDLETON ROAD Length: 6.00

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 818,415 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $654,732

State $163,683

Other $0

Total $818,415

Miller Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0008667 0008667

2015

CST

2015

UTL

NHPP NHPP

$632,155 $41,208

$158,039 $10,302

$0

$790,194

$0

$51,510

$673,363

$168,341

$0

$841,704

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

269

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Mitchell

Project: 0001570 Type Work: Turn Lanes
Descp:SR 3/US 19 FROM CR 219/SUNSET DRIVE TO CR 159/BIG CREEK ROAD Length: 21.31

Phase CST

Fund NHPP

Year 2018

Federal $11,004,185

State $2,751,046

Other $0

Total $13,755,232

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 13,755,232 $0 0

Project Details: Project will improve the capacity and operations of the intersection to enhance mobility. On GRIP
Network

Also in Thomas County

Project: 0008446 Type Work: Replace Bridge Descp:CR 133/STAGE COACH ROAD @ LITTLE CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 820,404 $ 300,000 3

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $400,000 $8,000

State $60,000
$0 $100,000
$2,000

Other $0
$10,404 $0 $0

Total $300,000
$10,404 $500,000
$10,000

Project: 0010611 Type Work: TE-Bike/Ped Facility
Descp:SR 93; CR 305/E RAILROAD ST & CS 704/W RAILROAD ST @ 3 LOCS Length: 0.94

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 312,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $250,000

State $0

Other $62,500

Total $312,500

Project: M004963 Type Work: Resurface & Maintenance
Descp:SR 3 FROM THOMAS COUNTY LINE TO DOUGHERTY COUNTY LINE Length: 29.34

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,348,919 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,679,135

State $669,784

Other $0

Total $3,348,919

270

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005028 Type Work: Resurface & Maintenance Descp:SR 93 FROM GRADY COUNTY LINE TO SR 3
Length: 33.94

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,257,857 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $5,006,286

State $1,251,571

Other $0

Total $6,257,857

Project: M005078 Type Work: Resurface & Maintenance
Descp:SR 37 FROM E OF CAMILLA CITY LIMITS TO CR 23/PINECLIFF ROAD Length: 4.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,126,035 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $900,828

State $225,207

Other $0

Total $1,126,035

Project: M005220 Type Work: Resurface & Maintenance Descp:SR 112 FROM SR 3 TO WORTH COUNTY LINE
Length: 16.49

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,737,386 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,389,909

State $347,477

Other $0

Total $1,737,386

Project: M005221 Type Work: Resurface & Maintenance
Descp:SR 37 FROM BAKER COUNTY LINE TO CAMILLA CITY LIMITS Length: 6.74

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,420,253 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,136,202

State $284,051

Other $0

Total $1,420,253

Mitchell Totals Summary
County Summary excludes lump sum projects.

Project PI#
0001570 0008446

Year
2018 2016

Phase
CST ROW

Fund
NHPP Local

Federal
$330,126 $0

State
$82,531 $0

Other
$0 $10,404

Total
$412,657 $10,404

$330,126

$82,531

$10,404

$423,061

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

271

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Monroe

Project: 0007046 Type Work: Replace Bridge Descp:SR 83 @ TOWALIGA RIVER

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,826,376 $ 517,532 4

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2016 After 2018 After 2018

Federal $414,025 $81,878
$4,629,544 $335,653

State $103,506
$20,470 $1,157,386
$83,913

Other $0 $0 $0 $0

Total $517,532 $102,348 $5,786,931 $419,566

Project: 0008884 Type Work: Roundabout Descp:SR 18 @ SR 87
Length: 0.18

Phase ROW CST UTL

Fund Safety Safety Safety

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,271,893 $ 230,000 4

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018

Year 2014 LUMP LUMP

Federal $230,000
$1,765,893 $276,000

State $0 $0 $0

Other $0 $0 $0

Total $230,000 $1,765,893 $276,000

Project: 0009336 Type Work: RRX Consolidation
Descp:INDIAN SPRINGS RD CROSSOVER @NS #718327K &RR AVE@NS #718328S Length: 0.04

Phase CST

Fund HSIP

Year LUMP

Federal $16,236

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 16,236 $0 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018

State $0

Other $0

Total $16,236

Project: 0010304 Type Work: TE-Bike/Ped Facility
Descp:CR 271/TIFT COLLEGE DR FM SR 42/SR 83 TO CR 290/PATROL RD Length: 0.78

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 750,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $600,000

State $0

Other $150,000

Total $750,000

Project: 0013046 Type Work: RRX Warning Device
Descp:CS 625/INDIAN SPRINGS ROAD CROSSOVER @ NS #718329Y Length: 0.04

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 255,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $5,000
$250,000

State $0 $0

Other $0 $0

Total $5,000
$250,000

272

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013100 Type Work: RRX Warning Device Descp:CR 35/OLD MACON ROAD @ NS #718346P
Length: 0.20

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 260,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $260,000

State $0

Other $0

Total $260,000

Project: 0013117 Type Work: RRX Warning Device Descp:CR 34/RUMBLE ROAD @ NS #718345H
Length: 0.20

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $25,000
$250,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 275,000 $0 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018

State $0 $0

Other $0 $0

Total $25,000
$250,000

Project: M004519 Type Work: Signing Descp:I-475 @ 5 LOCS - SIGN UPGRADES
Length: 2.00

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,919,222 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $40,000
$2,879,222

State $0 $0

Other $0 $0

Total $40,000
$2,879,222

Also in Bibb County

Project: M004615 Type Work: Resurface & Maintenance Descp:SR 19 FROM BIBB COUNTY LINE TO SE OF SR 18

Phase CST

Length: 12.84

Fund STP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,754,021 $ 2,754,021 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,203,217

State $550,804

Other $0

Total $2,754,021

Project: M005001 Type Work: Resurface & Maintenance
Descp:SR 18 FROM E BARNESVILLE BYPASS/LAMAR TO W OF SR 83/MONROE Length: 10.75

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,164,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $931,200

State $232,800

Other $0

Total $1,164,000

Also in Lamar County

273

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005205 Type Work: Resurface & Maintenance Descp:SR 74 FROM SR 42 TO BIBB COUNTY LINE
Length: 8.66

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 912,417 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $729,934

State $182,483

Other $0

Total $912,417

Project: M005217 Type Work: Resurface & Maintenance Descp:SR 74 FROM SR 7 TO SR 42
Length: 6.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 653,232 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $522,586

State $130,646

Other $0

Total $653,232

Monroe Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007046

Year 2016

Phase ROW

Fund STP

Federal $81,878

State $20,470

Other $0

Total $102,348

$81,878

$20,470

$0

$102,348

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

274

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Montgomery

Project: 0007037 Type Work: Replace Bridge Descp:SR 135 @ ALTAMAHA RIVER - TIA

Length: 0.60

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,441,627 $ 1,740,833 0

Phase PE
ROW CST CST

Fund STP STP State STP

Year 2017 2017 2014 After 2018

Federal $8,000
$42,448 $0
$5,310,187

State $2,000
$10,612 $0
$1,327,547

Other $0 $0
$1,740,833 $0

Total $10,000 $53,060
$1,740,833 $6,637,734

Also in Jeff Davis County

Project: M005030 Type Work: Resurface & Maintenance
Descp:SR 130 FROM SR 135/MONTGOMERY TO SR 30/TOOMBS Length: 6.07

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 574,142 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $459,313

State $114,828

Other $0

Total $574,142

Also in Toombs County

Montgomery Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007037 0007037

Year
2017 2017

Phase
PE ROW

Fund
STP STP

Federal
$4,000 $21,224

State
$1,000 $5,306

Other
$0 $0

Total
$5,000 $26,530

$25,224

$6,306

$0

$31,530

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

275

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Morgan

Project: 0009832 Type Work: Roundabout Descp:SR 24 BYPASS @ CR 252/BETHANY ROAD
Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 220,816 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $220,816

State $0

Other $0

Total $220,816

Project: 0010345 Type Work: TE-Bike/Ped Facility Descp:BOSTWICK STREETSCAPE - PHASE II
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 125,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $100,000

State $0

Other $25,000

Total $125,000

Project: 0013198 Type Work: Signals
Descp:SR 11;SR 24;SR 24BY;SR 36 & SR 81 @ 8 LOCS SIGNAL UPGRADES Length: 3.00

Phase PE
ROW CST

Fund STP STP STP

Year LUMP LUMP LUMP

Federal $290,000 $230,000
$1,250,000

State $0 $0 $0

Other $0 $0 $0

Total $290,000 $230,000 $1,250,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,770,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Also in Newton County

Project: 0013246 Type Work: RRX Warning Device
Descp:CS 603/LIONS CLUB ROAD @ MRSC #733144E IN MADISON Length: 0.40

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 210,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $10,000
$200,000

State $0 $0

Other $0 $0

Total $10,000
$200,000

276

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013259 Type Work: Pedestrian Crossings
Descp:SR 12; SR 15; SR 24 BYP; SR 36 &SR 162 @5 LOC - PED UPGRADES Length: 2.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 795,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $153,000 $562,500

State $17,000 $62,500

Other $0 $0

Total $170,000 $625,000

Also in Greene, Newton, Taliaferro County

Project: 222560- Type Work: Widening
Descp:SR 24/US 441 FM MADISON BYP TO JUST N OF APALACHEE RIV/OCONE
Lanes: Exist. 2 Prop. 4 Length: 7.92

Phase ROW CST

Fund NHPP NHPP

Year 2018 After 2018

Federal $9,755,017 $40,755,853

State $2,438,754 $10,188,963

Other $0 $0

Total $12,193,772 $50,944,816

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 63,138,588 $0 75

Project Details: Widen 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development

Also in Oconee County

Project: 222570- Type Work: Widening
Descp:SR 24/US 441 FM PUTNAM COUNTY TO N OF CR 121/PIERCE DAIRY RD
Lanes: Exist. 2 Prop. 4 Length: 8.10

Phase PE
ROW CST

Fund NHPP NHPP NHPP

Year

Federal

2015

$40,000

2016

$6,029,359

After 2018 $25,921,087

State $10,000 $1,507,340 $6,480,272

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 39,988,058 $0 90

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development

Project: M004936 Type Work: Resurface & Maintenance Descp:SR 24 FROM PUTNAM COUNTY LINE TO I-20
Length: 8.05

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,221,245 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,776,996

State $444,249

Other $0 $0 $0

Total $50,000
$7,536,699 $32,401,359

Other $0

Total $2,221,245

277

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005197 Type Work: Resurface & Maintenance
Descp:I-20 FROM NS #733146T/MORGAN TO SR 44/GREENE Length: 16.84

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 20,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $18,000

State $2,000

Other $0

Total $20,000

Also in Greene County

Morgan Totals Summary
County Summary excludes lump sum projects.

Project PI#
222560222570222570-

Year
2018 2015 2016

Phase
ROW PE
ROW

Fund
NHPP NHPP NHPP

Federal
$9,267,267 $40,000
$6,029,359

State
$2,316,817 $10,000
$1,507,340

Other
$0 $0 $0

Total
$11,584,083 $50,000
$7,536,699

$15,336,626

$3,834,156

$0

$19,170,782

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

278

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Murray

Project: 0006064 Type Work: Turn Lanes
Descp:SR 286 @ COBB ROAD AND @ TOM GREGORY ROAD Length: 0.80

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,553,119 $0 0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2015 2018 After 2018 After 2018

Federal $84,897
$340,744 $225,360 $591,495

Project Details: Project will improve the capacity and operations of the intersection to enhance mobility.

State $21,224 $85,186 $56,340 $147,874

Other $0 $0 $0 $0

Project: 0007047 Type Work: Replace Bridge Descp:SR 52 ALT @ TOWN BRANCH

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 425,708 $0 0

Phase PE
ROW CST

Fund STP STP STP

Year 2015 2017 After 2018

Federal $160,000 $50,730 $129,837

State $40,000 $12,682 $32,459

Other $0 $0 $0

Total $106,121 $425,930 $281,699 $739,369
Total $200,000
$63,412 $162,296

Project: 0009620 Type Work: Roundabout
Descp:SR 225 @ CR 132/MT CARMEL CHURCH ROAD/MITCHELL BRIDGE ROAD Length: 0.30

Phase ROW CST UTL

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,081,024 $0 7

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP LUMP

Federal $426,360
$1,617,944 $36,720

State $0 $0 $0

Other $0 $0 $0

Total $426,360 $1,617,944
$36,720

Project: 0010494 Type Work: Signing
Descp:CR 34 FM CS 621 TO SR 52 & CR 106/109 FM SR 225 TO WHITFIELD Length: 3.68

Phase PE CST

Fund Safety Safety

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 35,000 $0 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $10,000 $25,000

State $0 $0

Other $0 $0

Total $10,000 $25,000

Project: 0011686 Type Work: Replace Bridge Descp:SR 61 @ CSX #340636X 7.9 MI N OF CRANDALL

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,971,722 $0 5

Phase ROW CST UTL

Fund STP STP STP

Year 2016 2017 2017

Federal $848,134
$1,460,583 $68,660

State $212,034 $365,146
$17,165

Other $0 $0 $0

Total $1,060,168 $1,825,729
$85,825

279

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 631550- Type Work: New Construction
Descp:SR 225 BYP FM CR 105/IMPERIAL BLVD TO SR 52/US 76
Lanes: Exist. 0 Prop. 2 Length: 2.90

Phase ROW CST UTL

Fund STP STP STP

Year 2017 After 2018 After 2018

Federal $8,716,610 $7,916,294 $1,902,863

State $2,179,152 $1,979,074
$475,716

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 23,169,709 $0 54

Project Details: Will improve mobility and connectivity - enhance economic development

Other $0 $0 $0

Total $10,895,762
$9,895,368 $2,378,579

Project: M004909 Type Work: Resurface & Maintenance
Descp:SR 2 FROM SR 61 TO 0.50 MI S OF CR 166/DEWBERRY CHURCH RD Length: 6.90

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,815,754 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,452,603

State $363,151

Other $0

Total $1,815,754

Murray Totals Summary
County Summary excludes lump sum projects.

Project PI#
0006064 0006064 0007047 0007047 0011686 0011686 0011686 631550-

Year
2015 2018 2015 2017 2016 2017 2017 2017

Phase
PE ROW
PE ROW ROW CST UTL ROW

Fund
STP STP STP STP STP STP STP STP

Federal
$84,897 $340,744 $160,000
$50,730 $848,134 $1,460,583
$68,660 $8,716,610

State
$21,224 $85,186 $40,000 $12,682 $212,034 $365,146 $17,165 $2,179,152

Other
$0 $0 $0 $0 $0 $0 $0 $0

Total
$106,121 $425,930 $200,000
$63,412 $1,060,168 $1,825,729
$85,825 $10,895,762

$11,730,357

$2,932,589

$0

$14,662,946

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

280

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Newton

Project: 0004444 Type Work: Guardrail
Descp:SR 212 @ LAKE JACKSON GUARDRAIL @ APPROACHES Length: 0.40

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 348,145 $0 6

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $179,046 $169,099

State $0 $0

Other $0 $0

Total $179,046 $169,099

Also in Jasper County

Project: 0007049 Type Work: Replace Bridge Descp:SR 36 @ YELLOW RIVER 14 MI S OF COVINGTON
Length: 0.50

Phase ROW CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,804,764 $0 5

Fund STP STP

Year 2015 2016

Federal $290,496
$3,553,315

State $72,624 $888,329

Other $0 $0

Total $363,120 $4,441,644

Project: 0007592 Type Work: Sidewalks
Descp:YELLOW RIVER MULTI-USE TRAIL IN NEWTON COUNTY Length: 2.36

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 909,000 $0 11

Phase CST

Fund HPP

Year 2017

Federal $524,925

State $0

Other $384,075

Total $909,000

Project: 0009928 Type Work: Roundabout Descp:SR 11 @ SR 142
Length: 0.12

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,320,067 $ 400,000 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $400,000 $920,067

State $0 $0

Other $0 $0

Total $400,000 $920,067

Project: 0013198 Type Work: Signals
Descp:SR 11;SR 24;SR 24BY;SR 36 & SR 81 @ 8 LOCS SIGNAL UPGRADES Length: 3.00

Phase PE
ROW CST

Fund STP STP STP

Year LUMP LUMP LUMP

Federal $290,000 $230,000
$1,250,000

State $0 $0 $0

Other $0 $0 $0

Total $290,000 $230,000 $1,250,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,770,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Also in Morgan County

281

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013259 Type Work: Pedestrian Crossings
Descp:SR 12; SR 15; SR 24 BYP; SR 36 &SR 162 @5 LOC - PED UPGRADES Length: 2.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 795,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $153,000 $562,500

State $17,000 $62,500

Other $0 $0

Total $170,000 $625,000

Also in Greene, Morgan, Taliaferro County

Project: 231630- Type Work: Widening
Descp:SR 12/US 278 FM COVINGTON CITY LIMITS TO E OF SR 142
Lanes: Exist. 2 Prop. 4 Length: 2.46

Phase PE
ROW CST

Fund STP STP STP

Year 2014 2014 2018

Federal $160,000
$1,264,000 $7,319,402

State $40,000 $316,000 $1,829,851

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 10,929,253 $ 1,780,000 56

Project Details: Widen from 2 to 4 lanes - improve operation and mobility - reduce congestion - enhance economic
development - reduce crash frequency.

Other $0 $0 $0

Total $200,000 $1,580,000 $9,149,253

Project: 242230- Type Work: Widening Descp:SR 142 FM I-20 TO ALCOVY RD IN COVINGTON Lanes: Exist. 2 Prop. 4 Length: 1.70

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2015 2016 2016

Federal $40,000
$9,366,675 $1,116,349

State $10,000 $2,341,669 $279,087

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 13,153,781 $0 37

Project Details: widen fm 2 to 4 lanes- replace bridge over CSX RR on SR 142- additional capacity- improve
mobility and reduce congestion- enhance economic development- reduce crash frequency

Other $0 $0 $0

Total $50,000
$11,708,344 $1,395,437

Project: M004708 Type Work: Resurface & Maintenance
Descp:SR 36 FROM BUTTS COUNTY LINE TO CR 653/COVINGTON BYPASS ROAD Length: 13.72

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,049,937 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA GT 200K FOR FY 2015 - FY 2018

Federal $2,439,950

State $609,987

Other $0

Total $3,049,937

282

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005102 Type Work: Resurface & Maintenance
Descp:SR 142 FROM W OF CS 1044/ALCOVY ROAD TO SR 81 Length: 3.45

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 827,947 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $662,358

State $165,589

Other $0

Total $827,947

Project: M005142 Type Work: Resurface & Maintenance Descp:SR 12 FROM SR 142 TO MORGAN COUNTY LINE
Length: 9.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 979,848 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $783,878

State $195,970

Other $0

Total $979,848

Also in Walton County

Project: T004087 Type Work: Transit Projects
Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 199,764 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2015

Federal $159,811

State $0

Other $39,953

Total $199,764

Project: T004407 Type Work: Transit Projects
Descp:FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 200,000 $0 0

Phase Fund CST Transit

Year 2016

Federal $160,000

State $0

Other $40,000

Total $200,000

Project: T004864 Type Work: Transit Projects
Descp:FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 240,000 $0 0

Phase Fund CST Transit

Year 2017

Federal $192,000

State $0

Other $48,000

Total $240,000

283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project PI#
0007049 0007049 0007592 231630242230242230242230T004087 T004407 T004864

Year
2015 2016 2017 2018 2015 2016 2016 2015 2016 2017

Newton Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

ROW CST CST CST PE CST UTL CST CST CST

STP STP HPP STP NHPP NHPP NHPP Transit Transit Transit

$290,496 $3,553,315
$524,925 $7,319,402
$40,000 $9,366,675 $1,116,349
$159,811 $160,000 $192,000

$72,624 $888,329
$0 $1,829,851
$10,000 $2,341,669
$279,087 $0 $0 $0

$0 $0 $384,075 $0 $0 $0 $0 $39,953 $40,000 $48,000

Total
$363,120 $4,441,644
$909,000 $9,149,253
$50,000 $11,708,344 $1,395,437
$199,764 $200,000 $240,000

$22,722,975

$5,421,560

$512,028

$28,656,562

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

284

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Oconee

Project: 122660- Type Work: Widening
Descp:SR 24/US 441 FM N OF APALACHEE RIVER TO WATKINSVILLE BP
Lanes: Exist. 2 Prop. 4 Length: 8.70

Phase PE
ROW CST

Fund NHPP NHPP NHPP

Year 2015 After 2018 After 2018

Federal $800,000
$12,522,926 $42,468,435

State $200,000 $3,130,732 $10,617,109

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 69,739,201 $0 100

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development

Other $0 $0 $0

Total $1,000,000 $15,653,658 $53,085,543

Project: 222560- Type Work: Widening
Descp:SR 24/US 441 FM MADISON BYP TO JUST N OF APALACHEE RIV/OCONE
Lanes: Exist. 2 Prop. 4 Length: 7.92

Phase ROW CST

Fund NHPP NHPP

Year 2018 After 2018

Federal $9,755,017 $40,755,853

State $2,438,754 $10,188,963

Other $0 $0

Total $12,193,772 $50,944,816

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 63,138,588 $0 75

Project Details: Widen 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development

Also in Morgan County

Project: M005178 Type Work: Resurface & Maintenance
Descp:SR 24 FM MORGAN COUNTY TO 0.10 MI N OF CR 107/THOMAS FARM RD Length: 9.40

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,408,489 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,926,791

State $481,698

Other $0

Total $2,408,489

Project PI#
122660222560-

Year
2015 2018

Oconee Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

PE

NHPP

$800,000

$200,000

$0

ROW

NHPP

$487,751

$121,938

$0

Total
$1,000,000 $609,689

$1,287,751

$321,938

$0

$1,609,689

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

285

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Oglethorpe

Project: 222460- Type Work: Passing Lanes
Descp:SR 10:OGLETHORPE 13.7-15;15.3-16.2 &WILKES 0-1.5;5.5-7.0-TIA
Lanes: Exist. 2 Prop. 3 Length: 5.32

Phase PE
ROW CST

Fund State State NHPP

Year 2014 2014 2015

Federal $0 $0
$5,082,748

State $0 $0
$1,270,687

Other $100,000 $100,000
$0

Total $100,000 $100,000 $6,353,435

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,553,435 $ 200,000 60

Project Details: Construct 4 passing lane sections - Passing opportunity improvements to address operational &
safety issues

Also in Wilkes County

Project: M005056 Type Work: Resurface & Maintenance
Descp:SR 10 FROM CLARKE COUNTY LINE TO WILKES COUNTY LINE Length: 18.56

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,125,532 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $3,300,426

State $825,106

Other $0

Total $4,125,532

Oglethorpe Totals Summary
County Summary excludes lump sum projects.

Project PI# 222460-

Year 2015

Phase CST

Fund NHPP

Federal $2,134,754

State $533,689

Other $0

Total $2,668,443

$2,134,754

$533,689

$0

$2,668,443

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

286

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Peach

Project: 0008189 Type Work: TE-Historic Preservation
Descp:FORT VALLEY FREIGHT DEPOT REHABILITATION IN PEACH COUNTY Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,070,265 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $856,212

State $0

Other $214,053

Total $1,070,265

Project: 0010604 Type Work: TE-Bike/Ped Facility
Descp:FORT VALLEY STATE UNIVERSITY PEDESTRIAN IMPROVEMENTS Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $300,000

State $0

Other $75,000

Total $375,000

Project: 0012838 Type Work: RRX Warning Device
Descp:CS 617/TULIP DRIVE @ GSR #718515A IN FORT VALLEY Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 220,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $220,000

State $0

Other $0

Total $220,000

Project: M004961 Type Work: Resurface & Maintenance
Descp:SR 49 FROM SR 7 TO 0.15 MI N OF CR 278/ALEXANDER WAY Length: 2.74

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 625,482 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $500,386

State $125,096

Other $0

Total $625,482

287

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004989 Type Work: Resurface & Maintenance
Descp:SR 7 FROM CS 772/MASON TERRACE/HOUSTON TO SR 49/PEACH Length: 11.03

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,324,242 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,859,394

State $464,848

Other $0

Total $2,324,242

Also in Houston County

288

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Pickens

Project: 0006416 Type Work: Realignment
Descp:SR 53 FM E OF CR 269/RYO MOUNTAIN RD TO W OF CR 178/DAVIS RD Length: 1.50

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,985,881 $0 28

Phase PE
ROW CST UTL

Fund HSIP HSIP HSIP HSIP

Year LUMP LUMP LUMP LUMP

Federal $35,100
$2,952,000 $8,161,303
$538,889

State $3,900
$328,000 $906,811 $59,877

Other $0 $0 $0 $0

Total $39,000
$3,280,000 $9,068,115
$598,766

Project Details: Realignment bring horizontal and vertical curves up to current standards add shoulders
decrease frequency of crashes
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Also in Gordon County

Project: 0008043 Type Work: Acceleration / Decel Lane
Descp:SR 515/US 76 @ CR 250/ANTIOCH CHURCH ROAD Length: 1.10

Phase ROW CST

Fund NHPP NHPP

Year 2017 After 2018

Federal $210,876 $810,680

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,276,945 $0 7

Project Details: Project will improve the capacity and operations of the intersection to enhance mobility.

State $52,719 $202,670

Other $0 $0

Total $263,595 $1,013,350

Project: 0008314 Type Work: Realignment Descp:SR 136 FROM SR 136 CONN TO SR 515
Length: 2.68

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $1,675,800 $4,990,562

State $186,200 $554,507

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 7,407,068 $0 25

Project Details: Realignment improve horizontal alignment decrease frequency of crashes add bike friendly
paved shoulders
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Other $0 $0

Total $1,862,000 $5,545,068

Project: 0009889 Type Work: Roundabout Descp:SR 53 @ SR 53BU
Length: 0.25

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,104,081 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $165,612 $938,469

State $0 $0

Other $0 $0

Total $165,612 $938,469

289

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0010769 Type Work: RRX Warning Device Descp:SR 53 @ GNR #340856T IN TATE
Length: 0.40

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 209,100 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $5,100
$204,000

State $0 $0

Other $0 $0

Total $5,100
$204,000

Project: 0013110 Type Work: Signals
Descp:SR 52 @ 1 LOC; SR 53BU @ 2 LOCS & SR 515 @ 1 LOC Length: 1.60

Phase PE
ROW CST

Fund STP STP STP

Year LUMP LUMP LUMP

Federal $100,000 $80,000 $312,000

State $25,000 $20,000 $78,000

Other $0 $0 $0

Total $125,000 $100,000 $390,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 615,000 $0 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Also in Fannin, Gilmer County

Project: 621490- Type Work: Widening
Descp:SR 53BU FM SR 515/APD TO CR 243/INDUSTRIAL BLVD
Lanes: Exist. 2 Prop. 4 Length: 2.60

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 26,206,371 $ 450,000 38

Phase PE
ROW CST UTL

Fund STP NHPP NHPP NHPP

Year

Federal

2014

$360,000

2017

$8,502,721

After 2018 $10,774,405

After 2018 $1,327,971

State $90,000 $2,125,680 $2,693,601 $331,993

Project Details: Widen from 2 to 4 lanes with raised median reduce congestion and crash frequency

Other $0 $0 $0 $0

Total $450,000 $10,628,401 $13,468,006 $1,659,963

Project: 621595- Type Work: Passing Lanes
Descp:SR 53 FM E OF CR 36/OLD MILL WHITE RD TO E OF STEVE TATE RD
Lanes: Exist. 2 Prop. 3 Length: 2.30

Phase ROW CST UTL

Fund NHPP NHPP Local

Year 2016 After 2018 After 2018

Federal $935,221
$1,237,109 $0

State $233,805 $309,277
$0

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,752,171 $0 26

Project Details: Project will improve passing opportunities along the corridor for motorist and address operational
and safety issues at key locations.

Project: M003372 Type Work: Miscellaneous Improvements
Descp:SR 136 @ 2 LOC BTWN CR 305 & CR 224 EMERGENCY SLOPE REPAIR Length: 0.80

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,310,650 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,048,520

State $262,130

Other $0 $0
$36,758
Other $0

Total $1,169,027 $1,546,386
$36,758
Total $1,310,650

290

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005128 Type Work: Resurface & Maintenance Descp:SR 53BU FROM SR 515 TO SR 53
Length: 6.45

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,979,882 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,583,906

State $395,976

Other $0

Total $1,979,882

Pickens Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008043 621490621595-

Year
2017 2017 2016

Phase
ROW ROW ROW

Fund
NHPP NHPP NHPP

Federal
$210,876 $8,502,721
$935,221

State
$52,719 $2,125,680
$233,805

Other
$0 $0 $0

Total
$263,595 $10,628,401
$1,169,027

$9,648,819

$2,412,205

$0

$12,061,023

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

291

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Pierce

Project: 0010595 Type Work: TE-Bike/Ped Facility
Descp:SR 121 @ 1 LOC & CS 624/S CENTRAL AVE @ 1 LOC IN BLACKSHEAR Length: 0.58

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 312,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $250,000

State $0

Other $62,500

Total $312,500

Project: 531340- Type Work: Replace Bridge
Descp:CR 305/CR 530 @ BIG SATILLA CREEK & OVERFLOW Length: 0.60

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,145,751 $ 108,120 1

Phase ROW CST CST UTL

Fund Local STP STP Local

Year 2014 2016 2016 2016

Federal $0
$1,295,685 $2,630,634
$0

State $0 $0
$657,658 $0

Other $108,120 $323,921
$0 $129,733

Total $108,120 $1,619,606 $3,288,292 $129,733

Also in Appling County

Project: 532320- Type Work: Replace Bridge
Descp:CR 309 @ LITTLE HURRICANE CREEK 3 MI SE OF BACON COUNTY LINE Length: 0.40

Phase CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,277,814 $0 4

Fund STP

Year 2015

Federal $1,822,251

State $0

Other $455,563

Total $2,277,814

Project: M005172 Type Work: Resurface & Maintenance
Descp:SR 15 FM BRANTLEY COUNTY LINE TO 0.15 MI N OF CR 8/ARLON RD Length: 21.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,110,621 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $3,288,497

State $822,124

Other $0

Total $4,110,621

292

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Pierce Totals Summary
County Summary excludes lump sum projects.

Project PI#
531340531340531340532320-

Year
2016 2016 2016 2015

Phase
CST CST UTL CST

Fund
STP STP Local STP

Federal
$868,109 $427,576
$0 $1,822,251

State
$217,027 $0 $0 $0

Other
$0 $106,894
$42,812 $455,563

Total
$1,085,136 $534,470 $42,812
$2,277,814

$3,117,937

$217,027

$605,269

$3,940,232

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

293

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Pike

Project: 0010621 Type Work: TE-Bike/Ped Facility
Descp:SR 18; CR 250/E JACKSON; CS 559/ADAMS & CS 560/DUNN @ 4 LOCS Length: 0.45

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $400,000

State $0

Other $100,000

Project: 371130- Type Work: Replace Bridge
Descp:CR 5/BUFFINGTON ROAD @ TURNPIKE CREEK 5 MI E OF ZEBULON Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $500,000
Total $300,000
$10,824 $510,000
$10,200

Project: M004980 Type Work: Resurface & Maintenance Descp:SR 3 SO FROM SR 3 TO SR 3
Length: 0.82

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 100,793 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $80,634

State $20,159

Other $0

Total $100,793

Project: M005045 Type Work: Resurface & Maintenance
Descp:SR 7 FROM CS 600/REDBUD DRIVE TO CR 322/MEADOVISTA ROAD Length: 14.46

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,564,550 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $5,251,640

State $1,312,910

Other $0

Total $6,564,550

Also in Lamar, Spalding County

Project: M005088 Type Work: Resurface & Maintenance Descp:SR 109 FROM SR 18 TO SR 3
Length: 9.98

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,927,754 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,542,203

State $385,551

Other $0

Total $1,927,754

294

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005190 Type Work: Resurface & Maintenance
Descp:SR 74 FROM SR 18/PIKE TO POTATO CREEK/UPSON Length: 12.31

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,296,982 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,037,586

State $259,396

Other $0

Total $1,296,982

Also in Upson County

Pike Totals Summary
County Summary excludes lump sum projects.

Project PI# 371130-

Year 2016

Phase ROW

Fund Local

Federal $0

State $0

Other $10,824

Total $10,824

$0

$0

$10,824

$10,824

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

295

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Polk

Project: 0010495 Type Work: Signing
Descp:CR 441 @ 1 LOC; CR 442 @ 1 LOC & CR 444 @ 1 LOC Length: 8.03

Phase PE CST

Fund Safety Safety

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 83,000 $0 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $8,000
$75,000

State $0 $0

Other $0 $0

Total $8,000
$75,000

Project: M005072 Type Work: Resurface & Maintenance
Descp:SR 101 FROM N OF CR 507/HOLIDAY DR TO CR 313/DENEY POND RD Length: 10.54

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,751,748 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,401,398

State $350,350

Other $0

Total $1,751,748

Also in Floyd County

296

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Pulaski

Project: 0005533 Type Work: Replace Bridge
Descp:SR 11/US 129 @ BLUFF CREEK 4.7 MILES E OF FINLEYSON Length: 0.49

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,385,372 $0 7

Phase PE
ROW CST

Fund STP STP STP

Year 2018 2016 2018

Federal $8,000
$128,367 $1,771,930

State $2,000
$32,092 $442,983

Other $0 $0 $0

Total $10,000
$160,459 $2,214,913

Project: 0007050 Type Work: Replace Bridge Descp:SR 26 @ OCMULGEE RIVER

Length: 0.61

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 9,952,888 $0 0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2015 2016 2016

Federal $42,448
$6,664,240 $1,255,621

State $10,612 $1,666,060 $313,905

Other $0 $0 $0

Total $53,060
$8,330,300 $1,569,527

Project: 0007585 Type Work: Sidewalks
Descp:SIDEWALKS & LANDSCAPING IN DOWNTOWN HAWKINSVILLE Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 449,950 $0 0

Phase CST

Fund HPP

Year 2016

Federal $359,960

State $0

Other $89,990

Total $449,950

Project: 331890- Type Work: Replace Bridge
Descp:CR 198 @ TEN MILE CRK TRIB NW OF FINLEYSON Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $300,000
$10,824 $510,000
$10,200

Project: M004948 Type Work: Resurface & Maintenance Descp:SR 112 FROM WILCOX COUNTY LINE TO SR 11
Length: 8.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 983,799 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $787,039

State $196,760

Other $0

Total $983,799

297

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005071 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 11BU TO SR 230
Length: 0.68

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 191,052 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $152,842

State $38,210

Other $0

Total $191,052

Project: M005089 Type Work: Resurface & Maintenance Descp:SR 27 FROM SR 11 TO OCMULGEE RIVER
Length: 0.22

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 52,153 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $41,722

State $10,431

Other $0

Total $52,153

Pulaski Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005533 0005533 0005533 0007050 0007050 0007050 0007585 331890-

Year
2018 2016 2018 2015 2016 2016 2016 2016

Phase
PE ROW CST ROW CST UTL CST ROW

Fund
STP STP STP NHPP NHPP NHPP HPP Local

Federal
$8,000 $128,367 $1,771,930
$42,448 $6,664,240 $1,255,621
$359,960 $0

State
$2,000 $32,092 $442,983 $10,612 $1,666,060 $313,905
$0 $0

Other
$0 $0 $0 $0 $0 $0 $89,990 $10,824

Total
$10,000 $160,459 $2,214,913
$53,060 $8,330,300 $1,569,527
$449,950 $10,824

$10,230,567

$2,467,652

$100,814

$12,799,033

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

298

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Putnam

Project: 0007430 Type Work: RRX Warning Device Descp:CS 500/MAPLE STREET @ NS #733066A
Length: 0.40

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 165,204 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $7,030
$158,174

State $0 $0

Other $0 $0

Total $7,030
$158,174

Project: 0009896 Type Work: RRX Warning Device Descp:SR 16 @ NS #733043T
Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 265,302 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $265,302

State $0

Other $0

Total $265,302

Project: 0011702 Type Work: TE-Bike/Ped Facility
Descp:SR 24 FROM SR 16 TO N OF EAST HARRIS ST/WILLIE BAILEY ST Length: 0.10

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 312,500 $0 18

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $250,000

State $0

Other $62,500

Total $312,500

Project: 0013260 Type Work: Pedestrian Crossings
Descp:SR 22; SR 24; SR 29; SR 44 & SR 57 @ 5 LOCS PED UPGRADES Length: 2.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 795,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $153,000 $562,500

State $17,000 $62,500

Other $0 $0

Total $170,000 $625,000

Also in Baldwin, Wilkinson County

299

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 222580- Type Work: Widening
Descp:SR 24/US 441 FM EATONTON BP @ S OF SHERWOOD AVE TO MORGAN CL
Lanes: Exist. 2 Prop. 4 Length: 9.19

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 41,240,632 $0 80

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year

Federal

2015

$40,000

After 2018 $7,271,406

After 2018 $23,780,351

After 2018 $1,900,749

State $10,000 $1,817,851 $5,945,088 $475,187

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development

Project: M004968 Type Work: Resurface & Maintenance
Descp:SR 16 FROM 0.60 MI E OF ROOTY CREEK TO HANCOCK COUNTY LINE Length: 13.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,875,773 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,300,619

State $575,155

Other $0 $0 $0 $0

Total $50,000
$9,089,257 $29,725,438
$2,375,936

Other $0

Total $2,875,773

Project: M004986 Type Work: Resurface & Maintenance
Descp:SR 24 FROM CS 640/SARA LEE DR TO MORGAN COUNTY LINE Length: 8.90

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,637,191 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,309,752

State $327,438

Other $0

Total $1,637,191

Project: M004999 Type Work: Resurface & Maintenance Descp:SR 24BU/US 441BU FROM SR 16 TO SR 24/US 441

Phase CST

Length: 1.38

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 338,480 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $270,784

State $67,696

Other $0

Total $338,480

Project: M005065 Type Work: Resurface & Maintenance
Descp:SR 24 FROM CR 497/TED DUNN BLVD TO CS 640/JEFFERSON AVE Length: 5.60

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,620,159 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,296,127

State $324,032

Other $0

Total $1,620,159

300

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Putnam Totals Summary
County Summary excludes lump sum projects.

Project PI# 222580-

Year 2015

Phase PE

Fund NHPP

Federal $40,000

State $10,000

Other $0

Total $50,000

$40,000

$10,000

$0

$50,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

301

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Quitman

Project: M005051 Type Work: Resurface & Maintenance Descp:SR 50 FROM ALABAMA STATE LINE TO SR 39
Length: 2.70

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 711,186 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $568,949

State $142,237

Other $0

Total $711,186

302

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Rabun

Project: 122090- Type Work: Widening
Descp:SR 15/US 441 FM NORTH CL/CLAYTON TO NORTH CAROLINA LINE
Lanes: Exist. 2 Prop. 4 Length: 7.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 63,210,595 $ 200,000 188

Phase PE
ROW ROW CST UTL

Fund NHS NHPP HPP NHPP NHPP

Year

Federal

2014

$160,000

2016 $15,425,595

2016

$1,799,800

After 2018 $31,786,003

After 2018 $1,324,367

State $40,000 $3,856,399 $449,950 $7,946,501 $331,092

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development - Project on GRIP corridor & State Freight
Network if on GRIP/FN

Project: 170940- Type Work: Replace Bridge
Descp:CR 86/CAT GAP ROAD @ TALLULAH RIVER 7.1 MI NW OF TIGER Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400
$0 $102,000
$2,040

Other $0 $0
$90,890 $0 $0

Total $200,000 $19,281,993 $2,340,640 $39,732,503 $1,655,459

Other $0
$10,824 $0 $0

Total $102,000
$10,824 $510,000
$10,200

Project: M003640 Type Work: Culvert
Descp:SR 246 FROM CR 7/KELLEYS ROAD TO CR 92/WAYFARER LANE Length: 0.84

Phase Fund

Year

CST Emergency LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 16,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $12,800

State $3,200

Other $0

Project: M003641 Type Work: Shoulder Work
Descp:SR 246 FROM CR 92/WAYFARER LANE TO CS 853/WINDING RIDGE ROAD Length: 1.42

Phase Fund

Year

CST Emergency LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $12,000

State $3,000

Other $0

Total $16,000
Total $15,000

303

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M003642 Type Work: Shoulder Work
Descp:SR 246 FROM CS 853/WINDING RIDGE ROAD TO NORTH CAROLINA Length: 0.68

Phase Fund

Year

CST Emergency LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 14,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $11,200

State $2,800

Other $0

Total $14,000

Project: M004996 Type Work: Bridges
Descp:SR 28; SR 52; SR 72 & SR 77 @ 4 LOCS - SCOUR REPAIR & REHAB Length: 1.20

Phase PE CST

Fund STP STP

Year 2014 LUMP

Federal $360,000
$1,680,000

State $90,000 $420,000

Other $0 $0

Total $450,000 $2,100,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,550,000 $ 450,000 0

Project Details: Painting steel superstructure - deck rehab - correct broken welds - joint replacement - spall repairs
on State Freight Network on GRIP network
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Also in Elbert, Hart, Lumpkin County

Rabun Totals Summary
County Summary excludes lump sum projects.

Project PI#
122090122090170940-

Year
2016 2016 2016

Phase
ROW ROW ROW

Fund
HPP NHPP Local

Federal
$1,799,800 $15,425,595
$0

State
$449,950 $3,856,399
$0

Other
$90,890 $0
$10,824

Total
$2,340,640 $19,281,993
$10,824

$17,225,395

$4,306,349

$101,714

$21,633,458

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

304

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Randolph

Project: 0008362 Type Work: Replace Bridge
Descp:CR 22/ELEVEN BRIDGES RD @ CARTER CREEK 10 MI SE OF CUTHBERT Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $300,000
$10,824 $510,000
$10,200

Project: 0009851 Type Work: Roundabout Descp:SR 1/US 27 @ SR 50/US 82
Length: 0.25

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 850,000 $0 0

Project Details: On Freight/GRIP Network
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $850,000

State $0

Other $0

Total $850,000

Project: 0010606 Type Work: TE-Bike/Ped Facility
Descp:SHELLMAN DOWNTOWN STREETSCAPES @ 4 LOCS Length: 0.79

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $300,000

State $0

Other $75,000

Total $375,000

Project: M005052 Type Work: Resurface & Maintenance Descp:SR 1 FROM SR 1BU TO SR 1BU
Length: 4.14

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,163,190 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $930,552

State $232,638

Other $0

Total $1,163,190

305

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005077 Type Work: Resurface & Maintenance
Descp:SR 1 FM S OF MILL POND RD/CLAY TO CARNEGIE BILULAH/RANDOLPH Length: 7.67

Phase CST

Fund NHPP

Year LUMP

Total Project Cost:

$0

Total Project Authorizations:

$0

Total Parcels:

0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $0

State $0

Other $0

Total $0

Also in Clay County

Randolph Totals Summary
County Summary excludes lump sum projects.

Project PI# 0008362

Year 2016

Phase ROW

Fund Local

Federal $0

State $0

Other $10,824

Total $10,824

$0

$0

$10,824

$10,824

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

306

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Schley

Project: M005074 Type Work: Resurface & Maintenance
Descp:SR 26 FROM CHATTAHOOCHEE COUNTY LINE TO SR 3 Length: 23.27

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,801,340 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $3,841,072

State $960,268

Other $0

Total $4,801,340

Also in Marion County

Project: M005090 Type Work: Resurface & Maintenance
Descp:SR 26 FROM ELLAVILLE TO MACON COUNTY LINE Length: 5.52

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 605,810 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $484,648

State $121,162

Other $0

Total $605,810

Project: M005177 Type Work: Resurface & Maintenance Descp:SR 153 FROM SR 30/SUMTER TO SR 26/SCHLEY
Length: 9.08

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,264,475 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,811,580

State $452,895

Other $0

Total $2,264,475

Also in Sumter County

307

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Screven

Project: 0009918 Type Work: Roundabout
Descp:SR 73 LOOP @ CR 248/BUTTERMILK ROAD/SINGLETON ROAD Length: 0.12

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,238,469 $ 300,000 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $300,000 $938,469

State $0 $0

Other $0 $0

Project: M004709 Type Work: Resurface & Maintenance
Descp:SR 21 FROM S OF CS 761/HALCYONDALE RD TO S OF SR 73 Length: 1.71

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 798,080 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $638,464

State $159,616

Other $0

Total $300,000 $938,469
Total $798,080

308

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Seminole

Project: M005059 Type Work: Resurface & Maintenance Descp:SR 91 ALT FROM SR 91 TO SR 91
Length: 1.85

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 503,536 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $402,829

State $100,707

Other $0

Total $503,536

309

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Spalding

Project: 0000410 Type Work: Intersection Improvement
Descp:SR 362 @ CR 507/ROVER ZETELLA ROAD/MORELAND ROAD Length: 0.48

Phase ROW CST UTL

Fund HSIP HSIP HSIP

Year 2014 LUMP LUMP

Federal $828,000
$2,421,004 $57,480

State $92,000 $269,000
$6,387

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,673,871 $ 920,000 14

Project Details: realign- add traffic signal & turn lanes- improve traffic operatons- reduce congestion- reduce
frequency and severity of crashes
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Other $0 $0 $0

Total $920,000 $2,690,004
$63,867

Project: 331690- Type Work: Replace Bridge Descp:CR 496 @ UNNAMED CREEK S OF SR 16

Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $102,000
$10,824 $510,000
$10,200

Project: M005002 Type Work: Resurface & Maintenance
Descp:SR 92 FROM SR 3 TO CR 347/WESTMORELAND ROAD Length: 2.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 376,662 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $301,330

State $75,332

Other $0

Total $376,662

Project: M005003 Type Work: Resurface & Maintenance
Descp:SR 92 FROM CR 347/WESTMORELAND ROAD TO SR 85 Length: 14.67

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,385,234 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $3,508,187

State $877,047

Other $0

Total $4,385,234

Also in Fayette County

310

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005045 Type Work: Resurface & Maintenance
Descp:SR 7 FROM CS 600/REDBUD DRIVE TO CR 322/MEADOVISTA ROAD Length: 14.46

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,564,550 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $5,251,640

State $1,312,910

Other $0

Total $6,564,550

Also in Lamar, Pike County

Project: T004090 Type Work: Transit Projects
Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR SPALDING Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 227,585 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2015

Federal $182,068

State $0

Other $45,517

Total $227,585

Project PI#
331690T004090

Year
2016 2015

Spalding Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

ROW CST

Local Transit

$0 $182,068

$0

$10,824

$0

$45,517

Total
$10,824 $227,585

$182,068

$0

$56,341

$238,409

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

311

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Stephens

Project: 0010416 Type Work: Replace Bridge Descp:SR 184 @ TOCCOA CREEK 3.5 MI NE OF TOCCOA
Length: 0.15

Phase ROW CST UTL

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,710,500 $0 7

Fund STP STP STP

Year 2015 2016 2016

Federal $152,592
$1,137,154 $78,654

State $38,148 $284,289 $19,664

Other $0 $0 $0

Total $190,740 $1,421,443
$98,318

Project: 0010689 Type Work: TE-Bike/Ped Facility
Descp:CS 510/FOREACRE STREET & CR 780/SOUTH PARK LANE @ 2 LOCS Length: 0.22

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 406,250 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $325,000

State $0

Other $81,250

Total $406,250

Project: 0013154 Type Work: RRX Warning Device
Descp:RAILROAD CROSSING UPGRADES @SEV LOC FM TOCCOA TO OAKWOOD Length: 0.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 505,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Project: M003644 Type Work: Shoulder Work
Descp:SR 17 ALT FM CR 171/BLACK MOUNTAIN RD TO CR 174/PHILLIPS RD Length: 2.00

Phase Fund

Year

CST Emergency LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 25,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $5,000
$500,000
Federal $20,000

State $0 $0

Other $0 $0

Total $5,000
$500,000

Also in Banks, Habersham, Hall County

State $5,000

Other $0

Total $25,000

Project: M003645 Type Work: Drainage Improvements Descp:SR 17 FROM I-985 TO HABERSHAM COUNTY LINE

Phase Fund CST Emergency

Year LUMP

Length: 3.98

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 65,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $52,000

State $13,000

Other $0

Total $65,000

312

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005200 Type Work: Resurface & Maintenance
Descp:SR 106 FROM SR 59/FRANKLIN TO SR 63/STEPHENS Length: 9.90

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,469,105 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,975,284

State $493,821

Other $0

Total $2,469,105

Also in Franklin County

Stephens Totals Summary
County Summary excludes lump sum projects.

Project PI#
0010416 0010416 0010416

Year
2015 2016 2016

Phase
ROW CST UTL

Fund
STP STP STP

Federal
$152,592 $1,137,154
$78,654

State
$38,148 $284,289
$19,664

Other
$0 $0 $0

Total
$190,740 $1,421,443
$98,318

$1,368,400

$342,100

$0

$1,710,500

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

313

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Stewart

Project: 0007887 Type Work: Replace Bridge Descp:CR 33/2ND AVE @ HANNAHATCHEE CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,595,198 $ 155,000 4

Phase PE
ROW CST UTL

Fund Bridge Local STP STP

Year 2014 2016 2017 2017

Federal $124,000 $0
$1,033,165 $34,097

State $31,000
$0 $258,291
$8,524

Other $0
$106,121 $0 $0

Total $155,000 $106,121 $1,291,457
$42,621

Project: 0011687 Type Work: Replace Bridge
Descp:SR 39 @ HANNAHATCHEE CREEK TRIBUTARY 4.5 MI E OF OMAHA Length: 0.40

Phase ROW CST UTL

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 766,426 $0 1

Fund STP STP STP

Year 2016 2018 2018

Federal $127,345 $441,632 $44,163

State $31,836 $110,408 $11,041

Other $0 $0 $0

Total $159,181 $552,040
$55,204

Project: M004575 Type Work: Bridges
Descp:SR 39 @ HANNAHATCHEE CREEK TRIB CULVERT REHAB Length: 0.40

Phase PE CST

Fund STP STP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 0

Project Details: Bridge culvert rehab
Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018

Federal $40,000
$160,000

State $10,000 $40,000

Other $0 $0

Total $50,000
$200,000

Project: M004997 Type Work: Resurface & Maintenance Descp:SR 39 CONN FROM SR 39 TO SR 1/US 27
Length: 15.70

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,654,152 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,323,322

State $330,830

Other $0

Total $1,654,152

314

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005091 Type Work: Resurface & Maintenance Descp:SR 27 FROM SR 1 CONN TO SR 520
Length: 8.80

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,545,265 $0 0

Project Details: On Freight/GRIP Network
Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,236,212

State $309,053

Other $0

Total $1,545,265

Project: M005134 Type Work: Resurface & Maintenance
Descp:SR 520 FROM CHATTAHOOCHEE COUNTY LINE TO SR 27/US 280 Length: 11.30

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,190,568 $0 0

Project Details: On Freight/GRIP Network
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $952,454

State $238,114

Other $0

Total $1,190,568

Stewart Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007887 0007887 0007887 0011687 0011687 0011687

Year
2016 2017 2017 2016 2018 2018

Phase
ROW CST UTL ROW CST UTL

Fund
Local STP STP STP STP STP

Federal
$0 $1,033,165
$34,097 $127,345 $441,632
$44,163

State
$0 $258,291
$8,524 $31,836 $110,408 $11,041

Other
$106,121 $0 $0 $0 $0 $0

Total
$106,121 $1,291,457
$42,621 $159,181 $552,040
$55,204

$1,680,402

$420,101

$106,121

$2,206,624

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

315

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Sumter

Project: 0010213 Type Work: TE-Landscape/Beautify
Descp:GEORGIA SOUTHWESTERN STATE UNIVERSITY ENTRACEWAY Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,600,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $1,280,000

State $0

Other $320,000

Total $1,600,000

Project: 0010607 Type Work: TE-Rehab Hist Trans Bldg Descp:ANDERSONVILLE HISTORICAL TRAIN DEPOT
Length: 0.04

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 250,000 $0 1

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $200,000

State $0

Other $50,000

Total $250,000

Project: M004962 Type Work: Resurface & Maintenance Descp:SR 27 FROM SR 30 TO DOOLEY COUNTY LINE
Length: 14.21

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,245,748 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,796,598

State $449,150

Other $0

Total $2,245,748

Project: M004970 Type Work: Resurface & Maintenance Descp:SR 27 FROM SR 3 TO 0.06 MI W OF SR 49
Length: 1.03

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 131,131 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $104,905

State $26,226

Other $0

Total $131,131

316

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005046 Type Work: Resurface & Maintenance Descp:SR 49 FROM SR 27 TO MACON COUNTY LINE
Length: 9.64

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,994,796 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,595,837

State $398,959

Other $0

Total $1,994,796

Project: M005047 Type Work: Resurface & Maintenance Descp:SR 27 FROM SR 49 TO SR 3
Length: 1.03

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 378,945 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $303,156

State $75,789

Other $0

Total $378,945

Project: M005146 Type Work: Resurface & Maintenance
Descp:SR 30 FROM SR 27 TO 0.25 MI E OF CR 307/FELDER STREET Length: 1.30

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 142,673 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $114,138

State $28,535

Other $0

Total $142,673

Project: M005158 Type Work: Resurface & Maintenance
Descp:SR 27/US 280 FROM PLAINS CITY LIMITS TO 0.06 MI W OF SR 49 Length: 8.57

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,890,250 $0 0

Project Details: On GRIP Network
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,312,200

State $578,050

Other $0

Total $2,890,250

317

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005159 Type Work: Resurface & Maintenance Descp:SR 49 FROM TERRELL COUNTY LINE TO SR 27
Length: 13.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,390,752 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,112,602

State $278,150

Other $0

Total $1,390,752

Project: M005177 Type Work: Resurface & Maintenance Descp:SR 153 FROM SR 30/SUMTER TO SR 26/SCHLEY
Length: 9.08

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,264,475 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,811,580

State $452,895

Other $0

Total $2,264,475

Also in Schley County

318

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Talbot

Project: 0007051 Type Work: Replace Bridge
Descp:SR 22 @ POTTERS CREEK 10.1 MI E OF TALBOTTON Length: 0.21

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,172,476 $ 1,172,476 3

Phase CST CST UTL

Fund Bridge Bond Local

Year 2015 2015 LOCL

Federal $22,296 $0 $0

State $5,574
$1,138,606 $0

Other $0 $0
$6,000

Total $27,870
$1,138,606 $6,000

Project: M005004 Type Work: Resurface & Maintenance Descp:SR 22 FROM MUSCOGEE COUNTY LINE TO SR 96

Phase CST

Length: 7.80

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,746,342 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,397,074

State $349,268

Other $0

Total $1,746,342

Project: M005160 Type Work: Resurface & Maintenance
Descp:SR 22 FROM S OF CR 110/CARTER ROAD TO CS 533/ADAMS STREET Length: 1.88

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 412,663 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $330,130

State $82,533

Other $0

Total $412,663

Project: M005189 Type Work: Resurface & Maintenance
Descp:SR 41 FM N OF CS 532/INDUSTRIAL BLVD/MARION TO SR 22/TALBOT Length: 17.61

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,087,313 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,669,850

State $417,463

Other $0

Total $2,087,313

Also in Marion County

Project: M005191 Type Work: Resurface & Maintenance Descp:SR 208 FROM HARRIS COUNTY LINE TO SR 41
Length: 11.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,738,440 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,390,752

State $347,688

Other $0

Total $1,738,440

319

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005218 Type Work: Resurface & Maintenance Descp:SR 36 FROM SR 208/HARRIS TO SR 41/TALBOT
Length: 10.15

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,857,935 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,486,348

State $371,587

Other $0

Total $1,857,935

Also in Harris County

Talbot Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007051 0007051

Year
2015 2015

Phase
CST CST

Fund
Bond Bridge

Federal
$0 $22,296

State
$1,138,606 $5,574

Other
$0 $0

Total
$1,138,606 $27,870

$22,296

$1,144,180

$0

$1,166,476

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

320

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Taliaferro

Project: 0013259 Type Work: Pedestrian Crossings
Descp:SR 12; SR 15; SR 24 BYP; SR 36 &SR 162 @5 LOC - PED UPGRADES Length: 2.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 795,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Project: M004920 Type Work: Resurface & Maintenance
Descp:I-20 FROM SR 44/GREENE TO SR10/SR 17/MCDUFFIE Length: 41.95

Phase CST

Fund NHPP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,191,045 $ 8,191,045 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $153,000 $562,500
Federal $7,371,941

State $17,000 $62,500

Other $0 $0

Total $170,000 $625,000

Also in Greene, Morgan, Newton County

State $819,105

Other $0

Total $8,191,045

Also in Greene, McDuffie, Warren County

321

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Tattnall

Project: 0009880 Type Work: Roundabout Descp:SR 23/US 25/US 301 @ SR 196
Length: 0.50

Phase CST

Fund HSIP

Year LUMP

Federal $938,469

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 938,469 $0 0

Project Details: Project will improve the capacity and operations of the intersection to enhance mobility.
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

State $0

Other $0

Total $938,469

Project: M005009 Type Work: Resurface & Maintenance
Descp:SR 23 FROM LONG COUNTY LINE TO 0.14 MI N OF LOVES CHAPEL RD Length: 7.05

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,538,685 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,030,948

State $507,737

Other $0

Total $2,538,685

Project: M005097 Type Work: Resurface & Maintenance Descp:SR 144 FROM SR 121 TO SR 23
Length: 6.10

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,267,275 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,013,820

State $253,455

Other $0

Total $1,267,275

322

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Taylor

Project: 0007606 Type Work: Landscaping
Descp:SR 96 FROM E OF CS 611/SUMTER ST TO E OF CS 563/S MIMS ST Length: 1.36

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 341,000 $0 0

Phase CST

Fund HPP

Year 2016

Federal $272,800

State $0

Other $68,200

Total $341,000

Project: 0010608 Type Work: TE-Bike/Ped Facility Descp:SR 3; SR 137 & SR 137WE @ 4 LOCS IN BUTLER
Length: 0.97

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 312,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $250,000

State $0

Other $62,500

Project: 370892- Type Work: Replace Bridge Descp:CR 247 @ HORSE CREEK SE OF BUTLER
Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $312,500
Total $300,000
$10,824 $510,000
$10,200

Project: M005005 Type Work: Resurface & Maintenance Descp:SR 137 FROM MARION COUNTY LINE TO SR 128
Length: 27.23

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 9,809,507 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $7,847,606

State $1,961,901

Other $0

Total $9,809,507

Project: M005092 Type Work: Resurface & Maintenance Descp:SR 90 FROM SR 3 TO SR 137
Length: 4.76

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 18,653 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $14,922

State $3,731

Other $0

Total $18,653

323

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005161 Type Work: Resurface & Maintenance Descp:SR 3 SO/US 19 FROM SR 3 TO SR 3 IN BUTLER
Length: 1.01

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 115,283 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $92,226

State $23,057

Other $0

Total $115,283

Project: M005162 Type Work: Resurface & Maintenance Descp:SR 90 FROM MACON COUNTY LINE TO SR 3
Length: 5.10

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 559,716 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $447,773

State $111,943

Other $0

Total $559,716

Taylor Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007606 370892-

Year
2016 2016

Phase
CST ROW

Fund
HPP Local

Federal
$272,800 $0

State
$0 $0

Other
$68,200 $10,824

Total
$341,000 $10,824

$272,800

$0

$79,024

$351,824

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

324

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Telfair

Project: 0002425 Type Work: Replace Bridge
Descp:SR 31/US 319/US 441 @ TURNPIKE CREEK 5.3 MI S OF MCRAE Length: 0.20

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,896,716 $0 4

Year 2015 2016 2016

Federal $81,600
$2,149,815 $85,958

State $20,400 $537,454 $21,489

Other $0 $0 $0

Total $102,000 $2,687,268 $107,447

Project: 0012847 Type Work: Sidewalks Descp:SIDEWALK & CROSSWALK IN MCRAE

Lanes: Exist. Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 260,900 $0 0

Phase CST

Fund HPP

Year 2015

Federal $208,720

State $0

Other $52,180

Total $260,900

Project: 0013079 Type Work: RRX Consolidation
Descp:CS 692 @ CSX #635214X/DODGE & CS 729 @ CSX #635213R/TELFAIR Length: 0.42

Phase CST

Fund HSIP

Year LUMP

Federal $240,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 240,000 $0 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018

State $0

Other $0

Total $240,000

Also in Dodge County

Project: M004555 Type Work: Resurface & Maintenance
Descp:SR 31/US 319 FROM COFFEE COUNTY LINE TO 0.01 MI S OF SR 132 Length: 18.32

Phase CST

Fund NHPP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,415,938 $ 3,415,938 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,732,751

State $683,188

Other $0

Total $3,415,938

Project: M004556 Type Work: Resurface & Maintenance
Descp:SR 149 FROM 0.01 MI N OF SR 117 TO WHEELER COUNTY LINE Length: 18.51

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,765,530 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,212,424

State $553,106

Other $0

Total $2,765,530

325

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004557 Type Work: Resurface & Maintenance
Descp:SR 165 FROM 0.01 MI S OF CR 3/CRAVEY FARM ROAD TO SR 30 Length: 1.86

Phase CST

Fund STP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 312,525 $ 312,525 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $250,020

State $62,505

Other $0

Total $312,525

Project: M004558 Type Work: Resurface & Maintenance
Descp:SR 30/US 280 FROM DODGE COUNTY LINE TO SR 31 Length: 9.61

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,369,530 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,895,624

State $473,906

Other $0

Total $2,369,530

Project: M004975 Type Work: Resurface & Maintenance
Descp:SR 27 FROM S OF HELENA CITY LIMITS TO W OF CS 743/6TH AVE Length: 1.59

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 583,574 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $466,859

State $116,715

Other $0

Total $583,574

Telfair Totals Summary
County Summary excludes lump sum projects.

Project PI#
0002425 0002425 0002425 0012847

Year
2015 2016 2016 2015

Phase
ROW CST UTL CST

Fund
NHPP NHPP NHPP HPP

Federal
$81,600 $2,149,815
$85,958 $208,720

State
$20,400 $537,454
$21,489 $0

Other
$0 $0 $0 $52,180

Total
$102,000 $2,687,268
$107,447 $260,900

$2,526,092

$579,343

$52,180

$3,157,615

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

326

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Terrell

Project: 0007597 Type Work: Streetscapes Descp:STREETSCAPE IN DAWSON

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 247,923 $0 0

Phase PE CST

Fund HPP HPP

Year 2015 After 2018

Federal $38,339
$105,645

State $0 $0

Other $9,585
$94,355

Total $47,923
$200,000

Project: M004800 Type Work: Resurface & Maintenance
Descp:SR 55 FROM CALHOUN COUNTY LINE TO SR 520/US 82 Length: 10.80

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,100,000 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $880,000

State $220,000

Other $0

Total $1,100,000

Project: M004971 Type Work: Resurface & Maintenance
Descp:SR 520/US 82 FROM WEBSTER COUNTY LINE TO SR 45 Length: 10.60

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,350,448 $0 0

Project Details: On Freight/GRIP Network
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,680,358

State $670,090

Other $0

Total $3,350,448

Project: M004972 Type Work: Resurface & Maintenance
Descp:SR 520 FM 0.30 MI E OF CR 138/TAMMY LANE TO LEE COUNTY LINE Length: 8.50

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,795,200 $0 0

Project Details: On Freight/GRIP Network
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $2,236,160

State $559,040

Other $0

Total $2,795,200

327

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005075 Type Work: Resurface & Maintenance Descp:SR 32 FROM SR 520 TO CR 136/OLD MILL ROAD
Length: 1.50

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 355,590 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $284,472

State $71,118

Other $0

Total $355,590

Terrell Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007597

Year 2015

Phase PE

Fund HPP

Federal $38,339

State $0

Other $9,585

Total $47,923

$38,339

$0

$9,585

$47,923

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

328

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Thomas

Project: 0001570 Type Work: Turn Lanes
Descp:SR 3/US 19 FROM CR 219/SUNSET DRIVE TO CR 159/BIG CREEK ROAD Length: 21.31

Phase CST

Fund NHPP

Year 2018

Federal $11,004,185

State $2,751,046

Other $0

Total $13,755,232

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 13,755,232 $0 0

Project Details: Project will improve the capacity and operations of the intersection to enhance mobility. On GRIP
Network

Also in Mitchell County

Project: 0007126 Type Work: Median Crossovers
Descp:SR 3/US 19 FM N OF FLORIDA STATE LN TO S OF CR 219 - 20 LOCS Length: 9.49

Phase CST UTL

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 9,026,438 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $8,117,886
$5,909

State $901,987
$657

Other $0 $0

Total $9,019,873
$6,565

Project: 0007607 Type Work: Streetscapes Descp:STREETSCAPE IN THOMASVILLE

Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,000 $0 0

Phase CST

Fund HPP

Year 2016

Federal $215,977

State $0

Other $84,023

Total $300,000

Project: 0010609 Type Work: TE-Bike/Ped Facility
Descp:CR 384/METCALF ROAD FM BROAD STREET TO METCALF-BEACHTON ROAD Length: 0.12

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 187,500 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $150,000

State $0

Other $37,500

Total $187,500

329

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0013078 Type Work: RRX Warning Device Descp:CS 756/COVINGTON AVE @ CSX #636917D
Length: 0.40

Phase PE CST

Fund STP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 288,885 $ 13,885 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $13,885
$275,000

State $0 $0

Other $0 $0

Total $13,885
$275,000

Project: M004899 Type Work: Resurface & Maintenance
Descp:SR 38 FROM CR 34/GATLIN CREEK ROAD TO BROOKS COUNTY LINE Length: 10.16

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,821,145 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,456,916

State $364,229

Other $0

Total $1,821,145

Project: M005069 Type Work: Resurface & Maintenance
Descp:SR 35 FROM SR 3/SR 300 TO COLQUITT COUNTY LINE Length: 13.01

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 5,185,316 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $4,148,253

State $1,037,063

Other $0

Total $5,185,316

Thomas Totals Summary
County Summary excludes lump sum projects.

Project PI#
0001570 0007607

Year
2018 2016

Phase
CST CST

Fund
NHPP HPP

Federal
$10,674,060 $215,977

State
$2,668,515 $0

Other
$0 $84,023

Total
$13,342,575 $300,000

$10,890,037

$2,668,515

$84,023

$13,642,575

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

330

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Tift

Project: 0001340 Type Work: New Construction
Descp:SOUTH TIFTON BYP FM SR 520/US 82 WEST TO SR 35/US 319 EAST
Lanes: Exist. 0 Prop. 2 Length: 7.50

Phase ROW CST UTL

Fund HPP STP STP

Year

Federal

2016

$4,049,550

After 2018 $48,980,846

After 2018 $943,751

State $1,012,387 $12,245,211
$235,938

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 67,467,683 $0 107

Project Details: new bypass 0-2 lanes- improve mobility and connectivity-enhance economic development- increase
safety- remove truck traffic from commercial areas downtown

Project: 0007273 Type Work: Realignment
Descp:CR 299/OLD OMEGA ROAD FROM SR 35/US 319 TO I-75 Length: 0.30

Phase ROW CST UTL

Fund STP STP STP

Year 2014 2015 2015

Federal $288,000
$1,190,338 $5,998

State $72,000 $297,585
$1,499

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,855,420 $ 360,000 7

Project Details: intersection improve & re-alignment- additions of left and right turn lanes- improve capacity and
operations- improve mobility and connectivity

Project: 0007578 Type Work: Sidewalks
Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN TIFTON Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 704,271 $0 0

Phase ROW CST

Fund Local HPP

Year LOCL 2016

Federal $0
$554,925

State $0 $0

Other $0 $0 $0

Total $5,061,937 $61,226,057 $1,179,688

Other $0 $0 $0

Total $360,000 $1,487,923
$7,497

Other $5,000
$144,346

Total $5,000
$699,271

Project: 0010674 Type Work: TE-Bike/Ped Facility
Descp:SR 7 FROM 4TH ST TO 1ST ST & FROM SR 520 TO POPLAR ST Length: 0.49

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 625,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $500,000

State $0

Other $125,000

Total $625,000

331

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004807 Type Work: Resurface & Maintenance
Descp:I-75 FM S OF CR 204/SOUTHWELL RD/TIFT TO S OF SR 32/TURNER Length: 19.00

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 50,000 $0 0

Project Details: On Freight/GRIP Network
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $45,000

State $5,000

Other $0

Total $50,000

Also in Turner County

Project: M005210 Type Work: Resurface & Maintenance Descp:SR 35 FROM SR 520 TO IRWIN COUNTY LINE
Length: 7.93

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,823,444 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,458,755

State $364,689

Other $0

Total $1,823,444

Tift Totals Summary
County Summary excludes lump sum projects.

Project PI#
0001340 0007273 0007273 0007578

Year
2016 2015 2015 2016

Phase
ROW CST UTL CST

Fund
HPP STP STP HPP

Federal
$4,049,550 $1,190,338
$5,998 $554,925

State
$1,012,387 $297,585 $1,499 $0

Other
$0 $0 $0 $144,346

Total
$5,061,937 $1,487,923
$7,497 $699,271

$5,800,811

$1,311,471

$144,346

$7,256,628

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

332

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Toombs

Project: 0001216 Type Work: Replace Bridge
Descp:SR 4/US 1 @ ALTAMAHA RIVER; OVERFLOW & WILLIAMS CREEK - TIA Length: 1.56

Phase CST CST

Fund State Bond

Year 2014 2015

Federal $0 $0

State $0
$20,256,273

Other $4,969,781
$0

Total $4,969,781 $20,256,273

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 25,226,054 $ 4,969,781 7

Project Details: Widen bridges from 2 to 4 lanes-improve operation and mobility-reduce crash frequency-enhance
economic development-on a GRIP corridor-on State Freight corridor

Also in Appling County

Project: 0009135 Type Work: TE-Bike/Ped Facility
Descp:SR 4/US 1 FROM VICTORY DRIVE TO RAILROAD CORRIDOR @ US 280 Length: 0.99

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 15

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $300,000

State $0

Other $75,000

Total $375,000

Project: 0009883 Type Work: Roundabout Descp:SR 56 @ CR 332/CR 333/JOHNSON CORNER
Length: 0.50

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $165,612 $938,469

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,104,081 $0 0

Project Details: Project will improve the capacity and operations of the intersection to enhance mobility.
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

State $0 $0

Other $0 $0

Total $165,612 $938,469

Project: 522180- Type Work: Widening
Descp:SR 4/US 1 FM SR 56 TO SR 29; INC CLVT @ OPEN CREEK -TIA
Lanes: Exist. 2 Prop. 4 Length: 4.34

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 23,406,968 $ 400,000 30

Phase PE
ROW CST UTL

Fund NHPP NHPP State State

Year 2014 2017 After 2018 After 2018

Federal $320,000
$4,355,198 $0 $0

State $80,000 $1,088,799
$0 $0

Other $0 $0
$16,604,085 $958,886

Project Details: Widen from 2 to 4 lanes-improve operation and mobility-enhance economic development-on GRIP
corridor-on State Freight corridor

Total $400,000 $5,443,997 $16,604,085 $958,886

333

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 522200- Type Work: Widening
Descp:SR 4 FM CR 386/GREEN OAK RD TO SR 130/FISHER BAREFOOT HWY
Lanes: Exist. 2 Prop. 4 Length: 7.30

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year

Federal

2016

$7,482,557

After 2018 $39,039,438

After 2018 $2,122,466

State $1,870,639 $9,759,859
$530,616

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 60,805,575 $0 110

Project Details: Widen from 2 to 4 lanes-improve operation and mobility-enhance economic development-on GRIP
corridor

Other $0 $0 $0

Total $9,353,196 $48,799,297 $2,653,082

Project: M005030 Type Work: Resurface & Maintenance
Descp:SR 130 FROM SR 135/MONTGOMERY TO SR 30/TOOMBS Length: 6.07

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 574,142 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $459,313

State $114,828

Other $0

Total $574,142

Also in Montgomery County

Project: M005124 Type Work: Resurface & Maintenance
Descp:SR 30 FROM CS 770/CS 673/BROADFOOT BLVD TO SR 4/US 1 Length: 5.07

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,895,927 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,516,742

State $379,185

Other $0

Total $1,895,927

Project: M005173 Type Work: Resurface & Maintenance Descp:SR 130 FROM SR 30 TO SR 4
Length: 6.18

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,883,063 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,506,451

State $376,613

Other $0

Total $1,883,063

334

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Toombs Totals Summary
County Summary excludes lump sum projects.

Project PI#
0001216 522180522200-

Year
2015 2017 2016

Phase
CST ROW ROW

Fund
Bond NHPP NHPP

Federal
$0 $4,355,198 $7,482,557

State
$17,622,958 $1,088,799 $1,870,639

Other
$0 $0 $0

Total
$17,622,958 $5,443,997 $9,353,196

$11,837,754

$20,582,396

$0

$32,420,151

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

335

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Towns

Project: 0000303 Type Work: Replace Bridge
Descp:SR 2 @ HIGHTOWER CREEK 6.1 MI E OF HIAWASSEE Length: 0.57

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,527,406 $0 4

Phase CST UTL

Fund NHPP NHPP

Year 2015 2015

Federal $1,976,514
$45,410

State $494,129
$11,353

Other $0 $0

Total $2,470,643
$56,763

Project: 0000304 Type Work: Replace Bridge
Descp:SR 66 @ BRASSTOWN CREEK .5 MI NW OF YOUNG HARRIS Length: 0.76

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,437,961 $0 4

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Federal $692,757
$2,042,025 $15,587

State $173,189 $510,506
$3,897

Other $0 $0 $0

Total $865,946 $2,552,531
$19,484

Project: 0000305 Type Work: Replace Bridge
Descp:SR 66 @ CROOKED CREEK 3.2 MI NW OF YOUNG HARRIS Length: 0.66

Phase ROW CST UTL

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,129,776 $0 4

Fund STP STP STP

Year 2015 2016 2016

Federal $681,360
$1,802,652 $19,809

State $170,340 $450,663
$4,952

Other $0 $0 $0

Total $851,700 $2,253,315
$24,762

Project: 0007495 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 19 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,369,911 $ 580,000 18

Phase PE
ROW CST UTL

Fund HSIP HSIP HSIP HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year 2014 2014 LUMP LUMP

Project: 0010688 Type Work: TE-Bike/Ped Facility
Descp:SR 2/SR 515 FM CS 352/SCHOOL ST TO CR 33/BRASSTOWN CREEK Length: 0.33

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 343,750 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $18,000
$504,000 $2,429,920
$81,000
Federal $275,000

State $2,000
$56,000 $269,991
$9,000

Other $0 $0 $0 $0

Total $20,000
$560,000 $2,699,911
$90,000

Also in Lumpkin, Union, White County

State $0

Other $68,750

Total $343,750

336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005063 Type Work: Resurface & Maintenance
Descp:SR 515 FROM UNION COUNTY LINE TO NORTH CAROLINA STATE LINE Length: 6.22

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,206,041 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $964,833

State $241,208

Other $0

Total $1,206,041

Towns Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000303 0000303 0000304 0000304 0000304 0000305 0000305 0000305

Year
2015 2015 2015 2016 2016 2015 2016 2016

Phase
CST UTL ROW CST UTL ROW CST UTL

Fund
NHPP NHPP STP STP STP STP STP STP

Federal
$1,976,514 $45,410
$692,757 $2,042,025
$15,587 $681,360 $1,802,652
$19,809

State
$494,129 $11,353
$173,189 $510,506
$3,897 $170,340 $450,663
$4,952

Other
$0 $0 $0 $0 $0 $0 $0 $0

Total
$2,470,643 $56,763
$865,946 $2,552,531
$19,484 $851,700 $2,253,315
$24,762

$7,276,114

$1,819,029

$0

$9,095,142

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

337

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Treutlen

Project: 0013257 Type Work: Pedestrian Crossings
Descp:SR 4BU; SR 23; SR 26 & SR 46 @ 5 LOCS PEDESTRIAN UPGRADES Length: 2.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 795,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $153,000 $562,500

State $17,000 $62,500

Other $0 $0

Total $170,000 $625,000

Also in Emanuel County

Project: M004189 Type Work: Signing
Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,700,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Project: M004702 Type Work: Resurface & Maintenance
Descp:SR 56 FROM MONTGOMERY COUNTY LINE TO SR 15 Length: 4.05

Phase CST

Fund STP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,011,660 $ 1,011,660 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,700,000
Federal $809,328

State $0

Other $0

Total $1,700,000

Also in Bleckley, Emanuel, Laurens County

State $202,332

Other $0

Total $1,011,660

Project: M004703 Type Work: Resurface & Maintenance Descp:SR 227 FROM SR 46 TO SR 56
Length: 2.18

Phase CST

Fund STP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 328,783 $ 328,783 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $263,027

State $65,757

Other $0

Total $328,783

338

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005131 Type Work: Resurface & Maintenance
Descp:SR 171 FROM SR 56/TREUTLEN TO SR 26/EMANUEL Length: 6.81

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,148,312 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $918,650

State $229,662

Other $0

Total $1,148,312

Also in Emanuel County

Project: M005153 Type Work: Resurface & Maintenance Descp:SR 15 FROM I-16 TO EMANUEL COUNTY LINE
Length: 5.07

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 623,196 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $498,557

State $124,639

Other $0

Total $623,196

339

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Troup

Project: 0009975 Type Work: Roundabout Descp:I-85 @ SR 18
Length: 0.30

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 938,469 $0 6

Project Details: On Freight/GRIP Network.
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP

Federal $938,469

State $0

Other $0

Total $938,469

Project: 0010623 Type Work: TE-Bike/Ped Facility
Descp:SR 14; CS 659/CS 687/9TH ST & CS 661/8TH ST @ 3 LOC - PH III Length: 0.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 625,000 $0 1

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $500,000

State $0

Other $125,000

Total $625,000

Project: 322250- Type Work: Widening
Descp:SR 1/US 27/LAGRANGE FM AUBURN ST TO SR 219/MORGAN ST
Lanes: Exist. 2 Prop. 4 Length: 1.42

Phase ROW CST UTL

Fund NHPP NHPP Local

Year

Federal

2016 $14,992,580

After 2018 $6,998,140

After 2018

$0

State $3,748,145 $1,749,535
$0

Other $0 $0
$1,338,975

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 28,827,375 $0 179

Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help
enhance economic development and will reduce crash frequency.

Total $18,740,725
$8,747,675 $1,338,975

Project: 342870- Type Work: Replace Bridge
Descp:CR 296/HAMMETT ROAD @ WEST POINT LAKE TRIB. N OF LAGRANGE Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $300,000
$10,824 $510,000
$10,200

340

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 343455- Type Work: Replace Bridge
Descp:CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE Length: 0.20

Phase ROW CST

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,306,255 $0 11

Fund Local STP

Year LOCL 2017

Federal $0
$2,395,404

State $0
$598,851

Other $312,000
$0

Total $312,000 $2,994,255

Project: M004517 Type Work: Signing Descp:I-185 @ 16 LOCS - SIGN UPGRADES
Length: 0.00

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,943,886 $0 0

Project Details: In Freight/GRIP Network.
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $80,000
$6,863,886

State $0 $0

Other $0 $0

Total $80,000
$6,863,886

Also in Harris, Muscogee County

Project: M004521 Type Work: Signing Descp:I-85 @ 12 LOCS - SIGN UPGRADES
Length: 4.80

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,831,907 $0 0

Project Details: In Freight/GRIP Network.
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $80,000
$3,751,907

State $0 $0

Other $0 $0

Total $80,000
$3,751,907

Also in Coweta County

Project: M004891 Type Work: Resurface & Maintenance
Descp:SR 219 FROM SR 14 CONN TO CS 718/SOUTH CHILTON AVE Length: 1.68

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 272,880 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $218,304

State $54,576

Other $0

Total $272,880

341

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004945 Type Work: Resurface & Maintenance Descp:SR 14 FROM ALABAMA STATE LINE TO SR 18
Length: 0.87

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 426,771 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $341,417

State $85,354

Other $0

Total $426,771

Project: M004953 Type Work: Resurface & Maintenance
Descp:SR 14 FROM SR 18 TO N OF CS 1187/MEDICAL PKWY Length: 14.33

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,208,344 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,566,675

State $641,669

Other $0

Total $3,208,344

Project: M004954 Type Work: Resurface & Maintenance
Descp:SR 109 FROM SR 1 TO MERIWETHER COUNTY LINE Length: 9.79

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,830,813 $0 0

Project Details: On Freight Network
Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,464,650

State $366,163

Other $0

Total $1,830,813

Project: M004985 Type Work: Resurface & Maintenance
Descp:SR 1 FROM SR 219 TO 0.10 MI N OF CR 758/FERNWOOD DRIVE Length: 4.20

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,673,968 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,339,174

State $334,794

Other $0

Total $1,673,968

342

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005024 Type Work: Resurface & Maintenance
Descp:SR 14 FROM E OF CS 1135/DAVIS ROAD TO COWETA COUNTY LINE Length: 14.55

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,460,840 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $3,568,672

State $892,168

Other $0

Total $4,460,840

Project: M005025 Type Work: Resurface & Maintenance Descp:SR 18 FROM SR 14 TO I-85
Length: 1.57

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 392,861 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $314,289

State $78,572

Other $0

Total $392,861

Project: M005085 Type Work: Resurface & Maintenance Descp:SR 103 FROM SR 219/HARRIS TO SR 18/TROUP
Length: 13.96

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,409,566 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,127,653

State $281,913

Other $0

Total $1,409,566

Also in Harris County

Project: M005093 Type Work: Resurface & Maintenance Descp:SR 100 FROM SR 14 TO COWETA COUNTY LINE
Length: 3.56

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 390,704 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $312,563

State $78,141

Other $0

Total $390,704

Project: M005103 Type Work: Resurface & Maintenance Descp:SR 18 FROM E OF I-85 TO HARRIS COUNTY LINE
Length: 6.33

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 47,627 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $38,102

State $9,525

Other $0

Total $47,627

Also in Harris County

343

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Troup Totals Summary
County Summary excludes lump sum projects.

Project PI#
322250342870343455-

Year
2016 2016 2017

Phase
ROW ROW CST

Fund
NHPP Local STP

Federal
$14,992,580 $0
$2,395,404

State
$3,748,145 $0
$598,851

Other
$0 $10,824
$0

Total
$18,740,725 $10,824
$2,994,255

$17,387,984

$4,346,996

$10,824

$21,745,805

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

344

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Turner

Project: 0000311 Type Work: Widening Descp:SR 107/SR 112 FROM CR 250 TO I-75 IN ASHBURN

Lanes: Exist. 2 Prop. 4 Length: 7.90

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 29,446,351 $ 50,000 56

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year

Federal

2014

$40,000

2018

$3,030,810

After 2018 $19,817,330

After 2018 $668,940

State $10,000 $757,703 $4,954,333 $167,235

Project Details: Widen from 2 to 4 lanes reconstruct intersection with SR 112 reduce crash frequency and
congestion enhance economic development

Other $0 $0 $0 $0

Total $50,000
$3,788,513 $24,771,663
$836,176

Project: 0000314 Type Work: Widening
Descp:SR 107 FROM CR 250/TURNER COUNTY TO CR 264/IRWIN COUNTY
Lanes: Exist. 2 Prop. 4 Length: 7.10

Phase ROW CST UTL

Fund STP STP STP

Year

Federal

2018

$3,643,900

After 2018 $28,865,254

After 2018 $720,865

State $910,975 $7,216,313 $180,216

Other $0 $0 $0

Total $4,554,875 $36,081,567
$901,081

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 41,537,522 $0 46

Project Details: widen from 2 to 4 lanes, improve mobility and reduce congestion, enhance economic development
and reduce crash frequency-

Also in Irwin County

Project: 0007579 Type Work: Sidewalks
Descp:CS 500/CARLOS AVE FM TOOMBS ST TO JEFFERSON ST IN ASHBURN Length: 0.16

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 534,578 $0 0

Phase CST

Fund HPP

Year 2015

Federal $401,950

State $0

Other $132,628

Total $534,578

Project: 0007596 Type Work: Streetscapes
Descp:SR 7 & SR 112 FM GORDON ST TO EAST COLLEGE ST IN ASHBURN Length: 0.15

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 196,070 $0 0

Phase CST

Fund HPP

Year 2016

Federal $155,980

State $0

Other $40,090

Total $196,070

345

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0010675 Type Work: TE-Bike/Ped Facility
Descp:SR 112 FROM SR 7/US 41 TO CS 503/JOHNSON STREET Length: 0.19

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 625,000 $0 3

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $500,000

State $0

Other $125,000

Total $625,000

Project: 0011646 Type Work: RRX Consolidation
Descp:CS 618/WILLIS STREET @ NS #723712Y & #925521X Length: 0.09

Phase CST

Fund HSIP

Year LUMP

Federal $15,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 15,000 $0 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018

State $0

Other $0

Total $15,000

Project: M004723 Type Work: Bridges Descp:I-75 @ HAT CREEK - SCOUR REHAB
Length: 0.20

Phase CST

Fund NHPP

Year LUMP

Federal $270,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 300,000 $0 0

Project Details: Scour rehab and maintenance repairs - on State Freight/GRIP Network
Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018

State $30,000

Other $0

Total $300,000

Project: M004805 Type Work: Resurface & Maintenance
Descp:I-75 FROM SR 159/TURNER TO N OF CR 355/OLD HATLEY RD/CRISP Length: 14.37

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 50,000 $0 0

Project Details: On Freight/GRIP Network
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $45,000

State $5,000

Other $0

Total $50,000

Also in Crisp County

346

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004807 Type Work: Resurface & Maintenance
Descp:I-75 FM S OF CR 204/SOUTHWELL RD/TIFT TO S OF SR 32/TURNER Length: 19.00

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 50,000 $0 0

Project Details: On Freight/GRIP Network
Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $45,000

State $5,000

Other $0

Total $50,000

Also in Tift County

Turner Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000311 0000314 0007579 0007596

Year
2018 2018 2015 2016

Phase
ROW ROW CST CST

Fund
STP STP HPP HPP

Federal
$3,030,810 $1,530,438
$401,950 $155,980

State
$757,703 $382,609
$0 $0

Other
$0 $0 $132,628 $40,090

Total
$3,788,513 $1,913,047
$534,578 $196,070

$5,119,178

$1,140,312

$172,718

$6,432,207

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

347

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Twiggs

Project: 0007054 Type Work: Replace Bridge Descp:SR 19 @ CSX RR 2.8 MI SE OF DRY BRANCH

Length: 0.56

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,403,384 $0 5

Phase CST UTL

Fund STP STP

Year 2015 2015

Federal $2,481,542
$241,165

State $620,386
$60,291

Other $0 $0

Total $3,101,928
$301,456

Project: 0008416 Type Work: Replace Bridge Descp:CR 189/BULLARD @ FLAT CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 633,024 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $102,000
$10,824 $510,000
$10,200

Project: M004188 Type Work: Signing Descp:I-16 @ 5 LOCS & I-75 @ 4 LOCS
Length: 3.60

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,300,000 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,300,000

State $0

Other $0

Total $1,300,000

Also in Bibb County

Twiggs Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007054 0007054 0008416

Year
2015 2015 2016

Phase
CST UTL ROW

Fund
STP STP Local

Federal
$2,481,542 $241,165 $0

State
$620,386 $60,291 $0

Other
$0 $0 $10,824

Total
$3,101,928 $301,456 $10,824

$2,722,707

$680,677

$10,824

$3,414,208

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

348

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Union

Project: 0007055 Type Work: Replace Bridge Descp:SR 180 @ SLAUGHTER CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,616,623 $ 433,190 0

Phase PE
ROW CST UTL

Fund Bridge STP STP STP

Year 2014 2016 2018 2018

Federal $346,552 $39,507
$4,688,990 $218,250

State $86,638
$9,877 $1,172,247
$54,563

Other $0 $0 $0 $0

Total $433,190
$49,383 $5,861,237
$272,813

Project: 0007495 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 19 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,369,911 $ 580,000 18

Phase PE
ROW CST UTL

Fund HSIP HSIP HSIP HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year 2014 2014 LUMP LUMP

Federal $18,000
$504,000 $2,429,920
$81,000

State $2,000
$56,000 $269,991
$9,000

Other $0 $0 $0 $0

Total $20,000
$560,000 $2,699,911
$90,000

Also in Lumpkin, Towns, White County

Project: 122900- Type Work: Widening
Descp:SR 515/2/US 76 FM E BLAIRSVILLE TO YOUNG HARRIS BP@CL/CORR A
Lanes: Exist. 2 Prop. 4 Length: 5.87

Phase PE
ROW CST

Fund App Dev App Dev App Dev

Year 2014 2016 2017

Federal $500,000
$32,275,000 $17,161,000

State $0 $0 $0

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 49,936,000 $ 500,000 250

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development - Project on GRIP corridor & State Freight
Network if on GRIP/FN

Other $0 $0 $0

Total $500,000 $32,275,000 $17,161,000

Union Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007055 0007055 0007055 122900122900-

Year
2016 2018 2018 2016 2017

Phase
ROW CST UTL ROW CST

Fund
STP STP STP App Dev App Dev

Federal
$39,507 $4,688,990
$218,250 $32,275,000 $17,161,000

State
$9,877 $1,172,247
$54,563 $0 $0

Other
$0 $0 $0 $0 $0

Total
$49,383 $5,861,237
$272,813 $32,275,000 $17,161,000

$54,382,746

$1,236,687

$0

$55,619,433

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

349

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Upson

Project: 0000297 Type Work: Roadway Project
Descp:SR 3/US 19 FM CR 73/EAST-WEST COUNTY RD TO CR 8/ATWATER RD Length: 2.00

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2015 2017 2017

Federal $9,887,472 $7,340,489
$574,929

State $2,471,868 $1,835,122
$143,732

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 22,253,613 $0 95

Project Details: Widen lanes to 12' - add raised median, auxiliary lanes at major intersections, and sidewalks -
realign Delray Rd and install new traffic signal at intersection - reduce crash frequency - improve
operation conditions on GRIP corridor.

Project: 0010624 Type Work: TE-Bike/Ped Facility
Descp:SR 3 FROM CS 602/R STREET TO CS 609/PARK DRIVE Length: 0.43

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 650,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $520,000

State $0

Other $0 $0 $0

Total $12,359,340
$9,175,611 $718,662

Other $130,000

Total $650,000

Project: M005058 Type Work: Resurface & Maintenance
Descp:SR 3 SO FROM CS 652/POPLAR DRIVE TO SR 3 IN THOMASTON Length: 1.76

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 539,593 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $431,674

State $107,919

Other $0

Total $539,593

Project: M005190 Type Work: Resurface & Maintenance
Descp:SR 74 FROM SR 18/PIKE TO POTATO CREEK/UPSON Length: 12.31

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,296,982 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,037,586

State $259,396

Other $0

Total $1,296,982

Also in Pike County

350

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Upson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000297 0000297 0000297

Year
2015 2017 2017

Phase
ROW CST UTL

Fund
NHPP NHPP NHPP

Federal
$9,887,472 $7,340,489
$574,929

State
$2,471,868 $1,835,122
$143,732

Other
$0 $0 $0

Total
$12,359,340 $9,175,611 $718,662

$17,802,890

$4,450,723

$0

$22,253,613

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

351

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Walker

Project: 0007543 Type Work: Miscellaneous Improvements
Descp:TRANSPORTATION IMPROVEMENTS IN WALKER COUNTY Length: 0.00

Phase PE CST

Fund Local HPP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,091,184 $ 22,000 0

Year 2014 2015

Federal $0
$1,655,347

State $0 $0

Other $22,000 $413,837

Total $22,000
$2,069,184

Project: 0010448 Type Work: Signals
Descp:SR 1 @ 3 LOC; SR 2 @ 4 LOC; SR 136 @ 3 LOC &SR 146 @ 2 LOC Length: 4.80

Phase ROW CST UTL

Fund STP STP STP

Year LUMP LUMP LUMP

Federal $985,000
$1,595,238 $395,000

State $0 $0 $0

Other $0 $0 $0

Total $985,000 $1,595,238 $395,000

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,975,238 $0 26

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018

Also in Catoosa, Dade County

Project: M005211 Type Work: Resurface & Maintenance Descp:SR 95 FROM SR 151 TO SR 1
Length: 7.78

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,865,679 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,492,543

State $373,136

Other $0

Total $1,865,679

Project PI# 0007543

Year 2015

Walker Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

HPP

$1,655,347

$0

$413,837

Total $2,069,184

$1,655,347

$0

$413,837

$2,069,184

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

352

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Walton

Project: 0010199 Type Work: TE-Bike/Ped Facility
Descp:SR 11 FROM BLUE WILLOW INN TO HIGHTOWER TRAIL Length: 0.23

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 500,000 $0 2

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $400,000

State $0

Other $100,000

Total $500,000

Project: 0012674 Type Work: Signals
Descp:SR 10; SR 10BU; SR 11; SR 20; SR 81; SR 138@15 LOC IN WALTON Length: 0.00

Phase ROW CST

Fund CMAQ CMAQ

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,100,000 $0 0

Year LUMP LUMP

Federal $600,000
$1,080,000

State $150,000 $270,000

Other $0 $0

Total $750,000 $1,350,000

Project: 132980- Type Work: Replace Bridge
Descp:SR 11 @ CSX RAILROAD IN SOUTH SOCIAL CIRCLE Length: 0.23

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,567,185 $ 725,000 14

Phase PE
ROW CST

Fund STP Bridge STP

Year 2014 2014 2016

Federal $180,000 $400,000
$1,473,748

State $45,000 $100,000 $368,437

Other $0 $0 $0

Total $225,000 $500,000 $1,842,185

Project: 132981- Type Work: Replace Bridge
Descp:SR 11 @ APALACHEE RIVER 7.5 MILES NORTH OF MONROE Length: 0.57

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,507,500 $0 7

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2017 2017

Federal $170,000
$1,800,000 $36,000

State $42,500 $450,000
$9,000

Other $0 $0 $0

Total $212,500 $2,250,000
$45,000

Project: M004660 Type Work: Resurface & Maintenance
Descp:SR 10 FM E OF CS 804/CHERRY HILL ROAD TO OCONEE COUNTY LINE Length: 7.35

Phase CST

Fund STP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,601,876 $ 3,601,876 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,881,501

State $720,375

Other $0

Total $3,601,876

353

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005142 Type Work: Resurface & Maintenance Descp:SR 12 FROM SR 142 TO MORGAN COUNTY LINE
Length: 9.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 979,848 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $783,878

State $195,970

Other $0

Total $979,848

Also in Newton County

Project: T004091 Type Work: Transit Projects
Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 43,346 $0 0

Project Details: Moved State Match to Other/Local

Phase Fund CST Transit

Year 2015

Federal $34,677

State $0

Other $8,669

Total $43,346

Project: T004410 Type Work: Transit Projects
Descp:FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 45,000 $0 0

Phase Fund CST Transit

Year 2016

Federal $36,000

State $0

Other $9,000

Total $45,000

Project: T004843 Type Work: Transit Projects
Descp:FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 54,000 $0 0

Phase Fund CST Transit

Year 2017

Federal $43,200

State $0

Other $10,800

Total $54,000

354

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project PI#

Walton Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Year

Phase

Fund

Federal

State

Other

Total

132980132981132981132981T004091 T004410 T004843

2016 2015 2017 2017 2015 2016 2017

CST ROW CST UTL CST CST CST

STP STP STP STP Transit Transit Transit

$1,473,748 $170,000
$1,800,000 $36,000 $34,677 $36,000 $43,200

$368,437 $42,500
$450,000 $9,000 $0 $0 $0

$0 $0 $0 $0 $8,669 $9,000 $10,800

$1,842,185 $212,500
$2,250,000 $45,000 $43,346 $45,000 $54,000

$3,593,625

$869,937

$28,469

$4,492,031

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

355

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Ware

Project: 0010293 Type Work: Realignment
Descp:SR 122 FM W OF CR 39/CORBITT RD TO E OF CR 68/PINE VALLEY RD Length: 0.90

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $861,300
$1,527,530

State $95,700 $169,726

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,654,256 $0 5

Project Details: Project will improve mobility and connectivity within the transportation network and enhance
economic development opportunities locally and within the region.
Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Other $0 $0

Total $957,000 $1,697,256

Project: 0011688 Type Work: Replace Bridge
Descp:SR 158 @ SATILLA RIVER 9 MI NW OF WAYCROSS Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 4,435,668 $ 357,000 0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2016 2018 2018

Federal $285,600 $127,345
$3,091,426 $44,163

State $71,400 $31,836 $772,857 $11,041

Other $0 $0 $0 $0

Total $357,000 $159,181 $3,864,283
$55,204

Project: 0012845 Type Work: Widening
Descp:SR 38/US 84 FROM PEAGLER CROSSING ROAD TO FIRE TOWER ROAD
Lanes: Exist. 2 Prop. 4 Length: 2.83

Phase PE CST UTL

Fund NHS NHPP NHPP

Year 2014 2015 2015

Federal $40,000
$3,563,200 $1,506,496

State $10,000 $890,800 $376,624

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,387,120 $ 50,000 0

Project Details: Widen from 2 to 4 lanes-improve operation and mobility-enhance economic development-on a GRIP
corridor-on a State Freight corridor

Other $0 $0 $0

Total $50,000
$4,454,000 $1,883,120

Project: 422120- Type Work: Widening
Descp:SR 38/US 84 FROM W OF WOODYARD CREEK TO W OF GREASY BRANCH
Lanes: Exist. 2 Prop. 4 Length: 11.60

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2015 2015 2015

Federal $3,680,000 $44,391,370
$785,298

State $920,000 $11,097,843 $196,325

Other $0 $0 $0

Total $4,600,000 $55,489,213
$981,623

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 61,070,835 $0 114

Project Details: widen from 2 to 4 lanes- new alignment will bypass Argyle on north side- bridges will be
replaced-improve mobility and reduce congestion-enhance economic development- reduce crash
frequency-GRIP-State Freight Corridor

Also in Clinch County

356

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 422125- Type Work: Replace Bridge Descp:SR 38/US 84 @ SUWANNEE CRK

Lanes: Exist. 2 Prop. 4 Length: 0.10

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,742,670 $0 0

Phase CST

Fund NHPP

Year 2015

Federal $1,394,136

State $348,534

Other $0

Total $1,742,670

Project: 522770- Type Work: Widening
Descp:SR 38/US 84 FM W OF GREASY BRANCH CK TO W OF CR 88/RUSKIN RD
Lanes: Exist. 2 Prop. 4 Length: 7.60

Phase CST

Fund NHPP

Year 2015

Federal $18,630,509

State $4,657,627

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 23,288,136 $0 69

Project Details: Widen from two to four lanes-improve operation and mobility-enhance economic development-on
GRIP corridor-on State Freight corridor

Project: 522775- Type Work: Replace Bridge
Descp:SR 38/US 84 @ GREASY BRANCH; LITTLE & BIG ALLIGATOR CREEK
Lanes: Exist. 2 Prop. 4 Length: 0.10

Phase PE CST

Fund NHPP NHPP

Year 2015 2015

Federal $40,000
$10,786,118

State $10,000 $2,696,530

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 13,532,648 $0 0

Project Details: Widen bridge from two to four lanes-improve operation and mobility-enhance economic
development-on GRIP corridor-on State Freight corridor

Project: 522780- Type Work: Widening
Descp:SR 38/US 84 FM W OF CR 88/RUSKIN RD TO E OF CR 294/WADLEY RD
Lanes: Exist. 2 Prop. 4 Length: 6.06

Phase CST UTL

Fund NHPP Local

Year 2016 2016

Federal $15,989,662
$0

State $3,997,416
$0

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 20,507,278 $0 132

Project Details: Widen from 2 to 4 lanes-improve operation and mobility-reduce crash frequency-enhance economic
development-on GRIP corridor-on State Freight corridor

Project: M004592 Type Work: Resurface & Maintenance
Descp:SR 4BU/US 1BU FM CS 911/CARSWELL AVE TO CR 358/WARING STREET Length: 2.17

Phase CST

Fund NHPP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 584,259 $ 584,259 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $467,407

State $116,852

Other $0

Total $23,288,136

Other $0 $0

Total $50,000
$13,482,648

Other $0
$520,200

Total $19,987,078
$520,200

Other $0

Total $584,259

357

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005010 Type Work: Resurface & Maintenance Descp:SR 4 FROM CS 978/PAFFORD ROAD TO SR 520
Length: 0.70

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 290,850 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $232,680

State $58,170

Other $0

Total $290,850

Project: M005011 Type Work: Resurface & Maintenance
Descp:SR 4BU FROM SR 4 TO CS 673/HARRISON STREET Length: 0.50

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 207,750 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $166,200

State $41,550

Other $0

Total $207,750

Project: M005023 Type Work: Resurface & Maintenance Descp:SR 38 FROM CR 71/AMMONS ROAD TO SR 520
Length: 8.53

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,875,550 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,500,440

State $375,110

Other $0

Total $1,875,550

Project: M005125 Type Work: Resurface & Maintenance
Descp:SR 520 FM W OF CR 112/ANITA ST TO W OF CR 392/HATCHER POINT Length: 5.00

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,077,500 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,662,000

State $415,500

Other $0

Total $2,077,500

358

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Ware Totals Summary
County Summary excludes lump sum projects.

Project PI#
0011688 0011688 0011688 0012845 0012845 422120422120422120422125522770522775522775522780522780-

Year
2016 2018 2018 2015 2015 2015 2015 2015 2015 2015 2015 2015 2016 2016

Phase
ROW CST UTL CST UTL PE CST UTL CST CST PE CST CST UTL

Fund
STP STP STP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP Local

Federal
$127,345 $3,091,426
$44,163 $3,563,200 $1,506,496 $1,288,000 $15,536,980
$274,854 $1,394,136 $18,630,509
$40,000 $10,786,118 $15,989,662
$0

State
$31,836 $772,857
$11,041 $890,800 $376,624 $322,000 $3,884,245
$68,714 $348,534 $4,657,627
$10,000 $2,696,530 $3,997,416
$0

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $520,200

Total
$159,181 $3,864,283
$55,204 $4,454,000 $1,883,120 $1,610,000 $19,421,224
$343,568 $1,742,670 $23,288,136
$50,000 $13,482,648 $19,987,078
$520,200

$72,272,889

$18,068,222

$520,200

$90,861,311

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

359

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Warren

Project: 0008680 Type Work: Frontage Roads
Descp:I-20 FRONTAGE RD FM CR 187/RIDGE RD TO SR 80 -PHASE II - TIA
Lanes: Exist. 0 Prop. 2 Length: 3.39

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 13,262,000 $ 2,500,000 0

Phase PE
ROW CST CST

Fund HPP Local State Local

Year 2015 2017 2014 After 2018

Federal $1,398,400
$0 $0 $0

State $0 $0 $0 $0

Other $349,600 $984,000 $2,500,000 $8,030,000

Project Details: New frontage road location - Improve mobility & connectivity enhance economic development
opportunities

Project: 0010844 Type Work: Frontage Roads
Descp:I-20 FRONTAGE RD FM CADLEY ROAD TO RIDGE ROAD - PH I - TIA
Lanes: Exist. 0 Prop. 2 Length: 2.68

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 12,602,311 $ 2,500,000 0

Phase ROW CST CST CST

Fund Local State HPP HPP

Year LOCL 2014 2017 2017

Federal $0 $0
$3,599,601 $3,012,648

State $0 $0 $0 $0

Other $1,837,000 $2,500,000
$899,900 $753,162

Project Details: New frontage road location - Improve mobility & connectivity enhance economic development
opportunities

Project: 0012747 Type Work: Preliminary Engineering Descp:CS 562/BAKER STREET @ CSX #279522W
Length: 0.20

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 165,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $25,000
$140,000

State $0 $0

Other $0 $0

Total $1,748,000
$984,000 $2,500,000 $8,030,000
Total $1,837,000 $2,500,000 $4,499,501 $3,765,809
Total $25,000
$140,000

Project: M004920 Type Work: Resurface & Maintenance
Descp:I-20 FROM SR 44/GREENE TO SR10/SR 17/MCDUFFIE Length: 41.95

Phase CST

Fund NHPP

Year 2015

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 8,191,045 $ 8,191,045 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $7,371,941

State $819,105

Other $0

Total $8,191,045

Also in Greene, McDuffie, Taliaferro County

360

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005042 Type Work: Resurface & Maintenance
Descp:SR 17 FROM JEFFERSON COUNTY LINE TO SR 12 Length: 13.60

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,089,664 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,671,731

State $417,933

Other $0

Total $2,089,664

Also in McDuffie County

Project: M005099 Type Work: Resurface & Maintenance
Descp:SR 12 FROM SR 12 BYPASS TO MCDUFFIE COUNTY LINE Length: 6.39

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,590,576 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,272,461

State $318,115

Other $0

Total $1,590,576

Warren Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008680 0008680 0010844 0010844

Year
2015 2017 2017 2017

Phase
PE ROW CST CST

Fund
HPP Local HPP HPP

Federal
$1,398,400 $0
$3,012,648 $3,599,601

State
$0 $0 $0 $0

Other
$349,600 $984,000 $753,162 $899,900

Total
$1,748,000 $984,000
$3,765,809 $4,499,501

$8,010,649

$0

$2,986,662

$10,997,311

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

361

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Washington

Project: 0006463 Type Work: Pedestrian Crossings
Descp:SR 15 @ 3 LOCS & SR 24 @ 2 LOCS PEDESTRIAN UPGRADES Length: 2.00

Phase PE CST

Fund Safety HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 975,000 $ 350,000 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year 2014 LUMP

Federal $315,000 $562,500

State $35,000 $62,500

Other $0 $0

Project: 0010715 Type Work: TE-Rehab Hist Trans Bldg
Descp:TENNILLE FREIGHT DEPOT REHAB & STREETSCAPE @ 4 LOCS - PH II Length: 0.21

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 625,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $500,000

State $0

Other $125,000

Project: 231170- Type Work: Replace Bridge
Descp:CR 376/HAMBURG RD N JCT W OF SR 102 @ COWPEN CRK Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $350,000 $625,000
Total $625,000
Total $300,000
$10,824 $510,000
$10,200

Project: 245080- Type Work: New Construction
Descp:SR 15 BYP FROM SR 15 TO SR 242 E OF TENNILLE
Lanes: Exist. 0 Prop. 4 Length: 3.70

Phase ROW CST UTL

Fund STP STP STP

Year

Federal

2017

$3,258,565

After 2018 $16,820,463

After 2018 $105,168

State $814,641 $4,205,116
$26,292

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 25,230,245 $0 85

Project Details: New location of a 4 lane bypass - Improve mobility & connectivity enhance economic development
opportunities

Project: M004987 Type Work: Resurface & Maintenance
Descp:SR 15 FROM JOHNSON COUNTY LINE TO NS #732742P Length: 11.82

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,260,779 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,808,623

State $452,156

Other $0 $0 $0

Total $4,073,207 $21,025,578
$131,460

Other $0

Total $2,260,779

362

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M005067 Type Work: Resurface & Maintenance
Descp:SR 15 FROM NS #7327429 TO 0.05 MI N OF CS 568/JERNIGAN ST Length: 3.30

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 373,427 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $298,742

State $74,685

Other $0

Total $373,427

Project: M005132 Type Work: Resurface & Maintenance
Descp:SR 242 SPUR FROM SR 242 TO CS 740/KAOLIN ROAD Length: 2.45

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 450,687 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $360,550

State $90,137

Other $0

Total $450,687

Project: M005154 Type Work: Resurface & Maintenance
Descp:SR 24 FROM JEFFERSON COUNTY LINE TO SR 231 Length: 4.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 421,440 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $337,152

State $84,288

Other $0

Total $421,440

Washington Totals Summary
County Summary excludes lump sum projects.

Project PI#
231170245080-

Year
2016 2017

Phase
ROW ROW

Fund
Local STP

Federal
$0 $3,258,565

State
$0 $814,641

Other
$10,824 $0

Total
$10,824 $4,073,207

$3,258,565

$814,641

$10,824

$4,084,031

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

363

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Wayne

Project: 0013197 Type Work: Roundabout
Descp:CR 396/RAYONIER ROAD @ CR 392/SPRING GROVE ROAD - HRRR Length: 0.60

Phase CST

Fund Safety

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,500,000 $0 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018

Year LUMP

Federal $1,500,000

State $0

Other $0

Total $1,500,000

364

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Wheeler

Project: 0007572 Type Work: Sidewalks
Descp:SR 30 & CR 40 SIDEWALKS & SPEED MONITORING SYSTEM IN ALAMO Length: 0.67

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 246,319 $0 0

Phase CST

Fund HPP

Year 2018

Federal $197,055

State $0

Other $49,264

Total $246,319

Project: 0008417 Type Work: Replace Bridge Descp:CR 178/SNOWHILL ROAD @ OCHWALKEE CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,810,229 $0 0

Phase PE
ROW CST UTL

Fund STP Local STP Local

Year 2015 2016 After 2018 After 2018

Federal $176,653 $0
$1,726,285 $0

State $44,163
$0 $431,571
$0

Other $0
$34,116 $0
$397,441

Total $220,816
$34,116 $2,157,856
$397,441

Project: 532342- Type Work: Replace Bridge Descp:CR 197 @ ALLIGATOR CREEK S OF GLENWOOD

Length: 0.20

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $300,000
$10,824 $510,000
$10,200

Wheeler Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007572 0008417 0008417 532342-

Year
2018 2015 2016 2016

Phase
CST PE ROW ROW

Fund
HPP STP Local Local

Federal
$197,055 $176,653
$0 $0

State
$0 $44,163
$0 $0

Other
$49,264 $0
$34,116 $10,824

Total
$246,319 $220,816
$34,116 $10,824

$373,708

$44,163

$94,204

$512,075

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

365

STATE TRANSPORTATION IMPROVEMENT PROGRAM

White

Project: 0001935 Type Work: TE-Scenic Hwy/Welcome Ctr
Descp:HARDMAN FARM VISITOR CENTER - PARKING LOTS&PEDESTRIAN TRAIL Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 721,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $576,800

State $0

Other $144,200

Total $721,000

Project: 0007495 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 19 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,369,911 $ 580,000 18

Phase PE
ROW CST UTL

Fund HSIP HSIP HSIP HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year 2014 2014 LUMP LUMP

Federal $18,000
$504,000 $2,429,920
$81,000

State $2,000
$56,000 $269,991
$9,000

Other $0 $0 $0 $0

Total $20,000
$560,000 $2,699,911
$90,000

Also in Lumpkin, Towns, Union County

Project: 0010194 Type Work: New Construction
Descp:WEST CLEVELAND BYP FROM N OF SR 115 TO E OF SR 11 - PH II
Lanes: Exist. 0 Prop. 4 Length: 1.73

Phase CST UTL

Fund STP STP

Year 2015 2015

Federal $14,576,915
$1,035,406

State $3,644,229
$258,852

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 19,515,402 $0 0

Project Details: New location of a 4 lane bypass - Improve mobility & connectivity enhance economic development
opportunities

Other $0 $0

Total $18,221,144
$1,294,258

Project: 0010684 Type Work: TE-Bike/Ped Facility
Descp:SR 17/SR 75 @ CHATTAHOOCHEE RIVER IN HELEN Length: 0.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 1

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $300,000

State $0

Other $75,000

Total $375,000

366

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004775 Type Work: Resurface & Maintenance Descp:SR 75 ALT FROM SR 11 TO SR 75
Length: 8.10

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 875,850 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $700,680

State $175,170

Other $0

Total $875,850

Project: M005064 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 115 TO LUMPKIN COUNTY LINE
Length: 8.49

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 2,116,557 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,693,246

State $423,311

Other $0

Total $2,116,557

Project: M005179 Type Work: Resurface & Maintenance Descp:SR 75 FROM CR 88/ASBESTOS ROAD TO SR 17
Length: 4.42

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,346,786 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $1,077,429

State $269,357

Other $0

Total $1,346,786

Project: M005180 Type Work: Resurface & Maintenance Descp:SR 17 FROM SR 75 TO SR 75 ALT
Length: 3.28

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 999,425 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $799,540

State $199,885

Other $0

Total $999,425

White Totals Summary
County Summary excludes lump sum projects.

Project PI#
0010194 0010194

Year
2015 2015

Phase
CST UTL

Fund
STP STP

Federal
$14,576,915 $1,035,406

State
$3,644,229 $258,852

Other
$0 $0

Total
$18,221,144 $1,294,258

$15,612,321

$3,903,080

$0

$19,515,402

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

367

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Wilcox

Project: 0013185 Type Work: RRX Warning Device
Descp:CS 644/BOWEN STREET @ HGR # 635232V IN ABBEVILLE Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 200,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $200,000

State $0

Other $0

Total $200,000

368

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Wilkes

Project: 222255- Type Work: Widening
Descp:SR 10/SR 17 FM SMITH MILL RD TO WASHINGTON BYP/WILKES - TIA
Lanes: Exist. 2 Prop. 4 Length: 12.00

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 38,105,012 $ 4,125,000 74

Phase PE CST CST UTL

Fund NHPP State NHPP NHPP

Year 2014 2014 2015 2015

Federal $100,000 $0
$25,534,418 $1,649,592

State $25,000
$0 $6,383,605
$412,398

Other $0
$4,000,000 $0 $0

Total $125,000 $4,000,000 $31,918,023 $2,061,990

Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce
crash frequency-enhance economic development - Project on GRIP corridor & State Freight
Network if on GRIP/FN

Also in McDuffie County

Project: 222460- Type Work: Passing Lanes
Descp:SR 10:OGLETHORPE 13.7-15;15.3-16.2 &WILKES 0-1.5;5.5-7.0-TIA
Lanes: Exist. 2 Prop. 3 Length: 5.32

Phase PE
ROW CST

Fund State State NHPP

Year 2014 2014 2015

Federal $0 $0
$5,082,748

State $0 $0
$1,270,687

Other $100,000 $100,000
$0

Total $100,000 $100,000 $6,353,435

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 6,553,435 $ 200,000 60

Project Details: Construct 4 passing lane sections - Passing opportunity improvements to address operational &
safety issues

Also in Oglethorpe County

Project: M004701 Type Work: Resurface & Maintenance

Phase

CST

Descp:SR 44 FROM SR 17BU/WILKES TO SR 79/LINCOLN

Length: 15.23

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 3,103,780 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $2,483,024

State $620,756

Other $0

Total $3,103,780

Also in Lincoln County

Project: M004933 Type Work: Resurface & Maintenance Descp:SR 17 FROM SR 47 TO 0.60 MI N OF SR 44
Length: 3.30

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,618,815 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,295,052

State $323,763

Other $0

Total $1,618,815

369

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004946 Type Work: Resurface & Maintenance Descp:SR 17BU FROM SR 17 TO SR 10
Length: 2.75

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 265,153 $0 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018

Federal $212,122

State $53,031

Other $0

Project: M004969 Type Work: Resurface & Maintenance Descp:SR 10BU FROM SR 10 TO SR 10 - TIA

Length: 4.57

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,409,390 $ 606,906 0

Phase CST CST

Fund State STP

Year 2014 LUMP

Federal $0
$641,987

State $0
$160,497

Other $606,906
$0

Total $265,153
Total $606,906 $802,484

Wilkes Totals Summary
County Summary excludes lump sum projects.

Project PI#
222255222255222460-

Year
2015 2015 2015

Phase
CST UTL CST

Fund
NHPP NHPP NHPP

Federal
$18,895,470 $1,220,698 $2,947,994

State
$4,723,867 $305,174 $736,998

Other
$0 $0 $0

Total
$23,619,337 $1,525,872 $3,684,992

$23,064,161

$5,766,040

$0

$28,830,201

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

370

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Wilkinson

Project: 0011762 Type Work: RRX Warning Device
Descp:CR 188/MACON ROAD @ NS #732725Y IN MCINTYRE Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 275,000 $0 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018

Year LUMP

Federal $275,000

State $0

Other $0

Total $275,000

Project: 0013260 Type Work: Pedestrian Crossings
Descp:SR 22; SR 24; SR 29; SR 44 & SR 57 @ 5 LOCS PED UPGRADES Length: 2.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 795,000 $0 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018

Year LUMP LUMP

Federal $153,000 $562,500

State $17,000 $62,500

Other $0 $0

Total $170,000 $625,000

Also in Baldwin, Putnam County

Project: M005187 Type Work: Resurface & Maintenance
Descp:SR 29 FM CR 162/JOHNS GOLDEN RD/WILKINSON TO SR 243/BALDWIN Length: 4.89

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,161,884 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $929,508

State $232,377

Other $0

Total $1,161,884

Also in Baldwin County

371

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Worth

Project: 0000475 Type Work: Widening
Descp:SR 133 FM N OF SR 112 TO N OF CR 459/COUNTY LINE ROAD
Lanes: Exist. 2 Prop. 4 Length: 3.40

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 20,846,698 $ 161,000 70

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year

Federal

2014

$128,800

2017

$3,207,463

After 2018 $12,892,814

After 2018 $448,281

State $32,200 $801,866 $3,223,204 $112,070

Other $0 $0 $0 $0

Total $161,000 $4,009,329 $16,116,018 $560,351

Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help
enhance economic development and will reduce crash frequency.

Also in Dougherty County

Project: 0000519 Type Work: Widening
Descp:SR 133 FM N OF COLQUITT COUNTY LINE TO N OF SR 112
Lanes: Exist. 2 Prop. 4 Length: 6.49

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 34,263,851 $ 339,600 129

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year

Federal

2014

$271,680

2017

$5,242,435

After 2018 $21,389,444

After 2018 $507,522

State $67,920 $1,310,609 $5,347,361 $126,880

Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help
enhance economic development and will reduce crash frequency.

Other $0 $0 $0 $0

Total $339,600 $6,553,044 $26,736,805 $634,402

Project: 0000520 Type Work: Widening
Descp:SR 133 FM S OF SR 35/US 319 TO N OF COLQUITT COUNTY LINE
Lanes: Exist. 2 Prop. 4 Length: 13.87

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 75,835,689 $ 161,000 166

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2014 2017 After 2018 After 2018

Federal $128,800
$10,214,764 $49,365,088
$959,900

State $32,200 $2,553,691 $12,341,272 $239,975

Other $0 $0 $0 $0

Total $161,000 $12,768,455 $61,706,360 $1,199,875

Project Details: widen from 2 to 4 lanes- turn lanes added at intersections- improve mobility-reduce
congestion-enhance economic development- reduce crash frequency- GRIP

Also in Colquitt County

Project: 0001572 Type Work: Turn Lanes
Descp:SR 300/US 19 MEDIAN TURN LANES FROM DOUGHERTY CO TO WARWICK Length: 13.50

Phase ROW CST

Fund NHPP NHPP

Year 2017 2018

Federal $284,896
$8,379,679

State $71,224 $2,094,920

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 10,830,719 $0 1

Project Details: Project will improve the capacity and operations of the intersection to enhance mobility.

Other $0 $0

Total $356,120 $10,474,599

372

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0007622 Type Work: Bicycle/Ped. Facility
Descp:CR 328/ISABELLA ST FM NORTH ST TO KING ST IN SYLVESTER Length: 0.44

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 646,116 $0 0

Phase CST

Fund HPP

Year 2016

Federal $311,960

State $0

Other $334,156

Total $646,116

Project: 0007914 Type Work: Streetscapes
Descp:SR 112 @ 1 LOC & CS 728/KELLY STREET @ 1 LOC IN SYLVESTER Length: 0.28

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 676,200 $0 0

Phase CST

Fund Local

Year 2017

Federal $0

State $0

Other $676,200

Total $676,200

Project: 0010610 Type Work: TE-Bike/Ped Facility
Descp:CS 726/FRONT STREET FROM SR 33 TO SR 112 IN SYLVESTER Length: 0.12

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 375,000 $0 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018

Federal $300,000

State $0

Other $75,000

Project: 431120- Type Work: Replace Bridge
Descp:CR 160 @ OCHLOCKONEE RIVER NE OF DOERUN Length: 0.50

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 831,024 $ 300,000 2

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2014 2016 LUMP LUMP

Federal $240,000 $0 $408,000 $8,160

State $60,000
$0 $102,000
$2,040

Other $0
$10,824 $0 $0

Total $375,000
Total $300,000
$10,824 $510,000
$10,200

Project: M005169 Type Work: Resurface & Maintenance
Descp:SR 133 FROM COLQUITT COUNTY LINE TO DOUGHERTY COUNTY LINE Length: 10.85

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations: Total Parcels:

$ 1,995,901 $0 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018

Federal $1,596,721

State $399,180

Other $0

Total $1,995,901

373

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Worth Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000475 0000519 0000520 0001572 0001572 0007622 0007914 431120-

Year
2017 2017 2017 2017 2018 2016 2017 2016

Phase
ROW ROW ROW ROW CST CST CST ROW

Fund
NHPP NHPP NHPP NHPP NHPP HPP Local Local

Federal
$3,111,239 $5,242,435
$306,443 $284,896 $8,379,679 $311,960
$0 $0

State
$777,810 $1,310,609
$76,611 $71,224 $2,094,920
$0 $0 $0

Other
$0 $0 $0 $0 $0 $334,156 $676,200 $10,824

Total
$3,889,049 $6,553,044
$383,054 $356,120 $10,474,599 $646,116 $676,200
$10,824

$17,636,653

$4,331,173

$1,021,180

$22,989,007

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

374

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: All Counties STIP Totals:
FY 2015 Total: FY 2016 Total: Appling STIP Totals:
FY 2015 Total: FY 2017 Total: Baker STIP Totals:
FY 2016 Total: Baldwin STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2017 Total: Banks STIP Totals:

STIP Counties Summary

Federal $

State $

All Counties

$459,827,651

$101,752,687

$484,640,032

$97,955,178

$478,391,581

$95,502,763

$479,418,018

$95,317,238

$1,902,277,283

$390,527,866

Appling

$0

$2,633,316

$2,630,634

$440,631

$2,630,634

$3,073,947

Baker

$93,220

$23,305

$4,852,814

$1,213,204

$4,946,034

$1,236,509

Baldwin

$0

$0

$0 Banks
$314,160

$0 $78,540

$1,991,326

$497,831

$4,055,310

$1,013,827

$6,360,795

$1,590,199

Other $

Total $

$23,473,639 $19,538,550 $22,730,927 $26,830,738 $92,573,853

$585,053,978 $602,133,760 $596,625,271 $601,565,994 $2,385,379,002

$0 $303,948 $303,948

$2,633,316 $3,375,213 $6,008,528

$0

$116,525

$0

$6,066,018

$0

$6,182,542

$10,824 $10,824

$10,824 $10,824

$0

$392,700

$0

$2,489,157

$0

$5,069,137

$0

$7,950,994

375

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2015 Total: FY 2016 Total: FY 2017 Total: Barrow STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Bartow STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2018 Total: Ben Hill STIP Totals:
FY 2017 Total: FY 2018 Total: Bleckley STIP Totals:
FY 2016 Total: Brantley STIP Totals:
FY 2016 Total: Brooks STIP Totals:

Federal $

State $

Barrow

$37,050

$0

$2,402,956

$590,739

$48,000

$0

$2,488,006

$590,739

Bartow

$7,853,038

$1,955,097

$24,814,304

$6,194,826

$31,983,639

$7,266,813

$42,548,367

$10,637,092

$107,199,348

$26,053,828

Ben Hill

$449,951

$0

$125,680

$31,420

$7,023,642

$1,755,911

$7,599,274

$1,787,331

Bleckley

$3,068,484

$767,121

$10,298,262

$2,574,565

$13,366,746

$3,341,687

Brantley

$984,660

$246,165

$984,660

$246,165

Brooks

$18,463,715

$4,615,929

$18,463,715

$4,615,929

Other $
$9,262 $10,000 $12,000 $31,262
$3,810,722 $8,750
$2,750,521 $0
$6,569,993
$112,488 $0 $0
$112,488
$117,399 $0
$117,399
$0 $0
$0 $0

Total $
$46,312 $3,003,696
$60,000 $3,110,008
$13,618,857 $31,017,880 $42,000,973 $53,185,459 $139,823,169
$562,439 $157,100 $8,779,553 $9,499,092
$3,953,005 $12,872,827 $16,825,832
$1,230,825 $1,230,825
$23,079,643 $23,079,643

376

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2016 Total: FY 2017 Total: FY 2018 Total: Bryan STIP Totals:
FY 2016 Total: FY 2018 Total: Bulloch STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2018 Total: Butts STIP Totals:
FY 2016 Total: FY 2017 Total: Calhoun STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Camden STIP Totals:

Federal $

State $

Bryan

$0

$0

$12,972,780

$3,243,195

$11,292,770

$2,823,193

$24,265,550

$6,066,388

Bulloch

$6,961,242

$1,740,310

$27,325,463

$6,831,366

$34,286,705

$8,571,676

Butts

$800,000

$200,000

$0

$0

$58,114

$14,529

$858,114

$214,529

Calhoun

$2,104,029

$526,007

$3,223,383

$805,846

$5,327,411

$1,331,853

Camden

$40,000

$10,000

$4,322,892

$1,080,723

$22,130,836

$5,532,709

$21,313,897

$5,328,474

$47,807,626

$11,951,906

Other $
$1,500,000 $0 $0
$1,500,000
$0 $0 $0
$0 $112,000
$0 $112,000
$0 $0 $0
$0 $0 $0 $0 $0

Total $
$1,500,000 $16,215,975 $14,115,963 $31,831,938
$8,701,552 $34,156,829 $42,858,381
$1,000,000 $112,000 $72,643
$1,184,643
$2,630,036 $4,029,228 $6,659,264
$50,000 $5,403,616 $27,663,546 $26,642,371 $59,759,532

377

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Carroll STIP Totals:
FY 2016 Total: FY 2017 Total: Charlton STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2018 Total: Chattooga STIP Totals:
FY 2015 Total: Clinch STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2018 Total: Coffee STIP Totals:
FY 2016 Total: FY 2017 Total: Colquitt STIP Totals:

Federal $

State $

Carroll

$251,972

$0

$4,484,238

$1,008,572

$4,277,605

$1,069,401

$4,946,902

$1,236,726

$13,960,718

$3,314,699

Charlton

$4,519,865

$1,129,966

$5,449,812

$1,362,453

$9,969,677

$2,492,419

Chattooga

$350,480

$87,620

$15,153,101

$3,788,275

$74,590,531

$18,647,633

$90,094,111

$22,523,528

Clinch

$31,756,834

$7,939,209

$31,756,834

$7,939,209

Coffee

$7,095,850

$1,773,963

$26,974,901

$6,743,725

$4,460,486

$1,115,122

$38,531,238

$9,632,810

Colquitt

$26,759,384

$6,689,846

$9,908,321

$2,477,080

$36,667,705

$9,166,926

Other $
$62,993 $112,487
$0 $0 $175,480
$10,824 $0
$10,824
$0 $53,060
$0 $53,060
$0 $0
$0 $0 $0 $0
$0 $0 $0

Total $
$314,965 $5,605,298 $5,347,007 $6,183,628 $17,450,897
$5,660,655 $6,812,265 $12,472,920
$438,100 $18,994,436 $93,238,163 $112,670,700
$39,696,043 $39,696,043
$8,869,813 $33,718,627
$5,575,608 $48,164,048
$33,449,231 $12,385,401 $45,834,632

378

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2016 Total: FY 2017 Total: Crawford STIP Totals:
FY 2015 Total: FY 2017 Total: Crisp STIP Totals:
FY 2015 Total: FY 2017 Total: FY 2018 Total: Dawson STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2018 Total: Decatur STIP Totals:
FY 2017 Total: Dodge STIP Totals:
FY 2015 Total: FY 2016 Total: Dooly STIP Totals:

Federal $

State $

Crawford

$242,205

$60,551

$901,807

$225,452

$1,144,013

$286,003

Crisp

$909,942

$227,486

$1,483,941

$370,985

$2,393,883

$598,471

Dawson

$11,936,760

$697,213

$1,415,412

$353,853

$269,174

$67,293

$13,621,346

$1,118,359

Decatur

$195,840

$48,960

$2,480,748

$620,187

$1,634,040

$408,510

$4,310,628

$1,077,657

Dodge

$16,109,543

$4,027,386

$16,109,543

$4,027,386

Dooly

$26,709,803

$6,677,451

$912,845

$228,211

$27,622,648

$6,905,662

Other $
$0 $0 $0
$0 $0 $0
$529,100 $0 $0
$529,100
$0 $0 $0 $0
$616,346 $616,346
$0 $0 $0

Total $
$302,756 $1,127,259 $1,430,016
$1,137,428 $1,854,926 $2,992,354
$13,163,073 $1,769,265 $336,467
$15,268,805
$244,800 $3,100,935 $2,042,549 $5,388,285
$20,753,274 $20,753,274
$33,387,254 $1,141,056
$34,528,310

379

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2016 Total: FY 2017 Total: Effingham STIP Totals:
FY 2015 Total: Elbert STIP Totals:
FY 2015 Total: Emanuel STIP Totals:
FY 2016 Total: Evans STIP Totals:
FY 2018 Total: Fannin STIP Totals:
FY 2017 Total: FY 2018 Total: Gilmer STIP Totals:
FY 2016 Total: Glascock STIP Totals:
FY 2016 Total: FY 2017 Total: Gordon STIP Totals:

Federal $

State $

Effingham

$394,520

$98,630

$0

$0

$394,520

$98,630

Elbert

$951,913

$1,349,449

$951,913

$1,349,449

Emanuel

$4,781,024

$1,195,256

$4,781,024

$1,195,256

Evans

$0

$0

$0

$0

Fannin

$13,723,800

$99,200

$13,723,800

$99,200

Gilmer

$2,701,411

$675,353

$4,319,894

$1,079,974

$7,021,305

$1,755,326

Glascock

$0

$0

$0

$0

Gordon

$176,653

$44,163

$30,106,323

$7,526,581

$30,282,976

$7,570,744

Other $
$0 $24,023,117 $24,023,117
$0 $0
$0 $0
$10,824 $10,824
$0 $0
$0 $0 $0
$10,824 $10,824
$0 $0 $0

Total $
$493,150 $24,023,117 $24,516,267
$2,301,362 $2,301,362
$5,976,280 $5,976,280
$10,824 $10,824
$13,823,000 $13,823,000
$3,376,764 $5,399,868 $8,776,631
$10,824 $10,824
$220,816 $37,632,904 $37,853,720

380

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2016 Total: Grady STIP Totals:
FY 2016 Total: Greene STIP Totals:
FY 2015 Total: FY 2017 Total: Hancock STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2018 Total: Haralson STIP Totals:
FY 2016 Total: FY 2018 Total: Harris STIP Totals:
FY 2015 Total: FY 2018 Total: Irwin STIP Totals:
FY 2016 Total: FY 2017 Total: FY 2018 Total: Jackson STIP Totals:

Federal $

State $

Grady

$1,600,000

$400,000

$1,600,000

$400,000

Greene

$0

$0

$0

$0

Hancock

$96,288

$24,072

$1,725,808

$431,452

$1,822,096

$455,524

Haralson

$97,920

$24,480

$3,909,123

$977,281

$31,667

$7,917

$4,038,710

$1,009,678

Harris

$54,586

$13,646

$4,595,774

$1,148,943

$4,650,359

$1,162,590

Irwin

$410,271

$0

$4,931,200

$1,232,800

$5,341,471

$1,232,800

Jackson

$11,949,919

$2,987,480

$590,518

$147,630

$6,800,808

$1,700,202

$19,341,245

$4,835,311

Other $
$0 $0
$10,824 $10,824
$0 $0 $0
$0 $0 $0 $0
$64,946 $0
$64,946
$102,568 $0
$102,568
$0 $0 $0 $0

Total $
$2,000,000 $2,000,000
$10,824 $10,824
$120,360 $2,157,260 $2,277,620
$122,400 $4,886,403
$39,584 $5,048,388
$133,178 $5,744,717 $5,877,895
$512,839 $6,164,000 $6,676,838
$14,937,398 $738,148
$8,501,010 $24,176,557
381

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2015 Total: Jasper STIP Totals:
FY 2015 Total: FY 2017 Total: Jeff Davis STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Jefferson STIP Totals:
FY 2015 Total: FY 2016 Total: Jenkins STIP Totals:
FY 2015 Total: FY 2017 Total: Johnson STIP Totals:
FY 2016 Total: Jones STIP Totals:
FY 2016 Total: Lamar STIP Totals:

Federal $

State $

Jasper

$1,639,267

$3,829,180

$1,639,267

$3,829,180

Jeff Davis

$3,169,295

$792,324

$520,172

$130,043

$3,689,467

$922,367

Jefferson

$888,460

$222,115

$292,800

$73,200

$13,691,215

$3,422,804

$16,236,121

$4,059,030

$31,108,596

$7,777,149

Jenkins

$1,023,253

$255,813

$655,744

$0

$1,678,997

$255,813

Johnson

$230,112

$57,528

$2,643,770

$660,943

$2,873,882

$718,471

Jones

$0

$0

$0

$0

Lamar

$0

$0

$0

$0

Other $
$173,652 $173,652
$0 $0 $0
$0 $0 $0 $0 $0
$0 $163,936 $163,936
$0 $0 $0
$10,824 $10,824
$10,824 $10,824

Total $
$5,642,099 $5,642,099
$3,961,619 $650,214
$4,611,834
$1,110,575 $366,000
$17,114,018 $20,295,151 $38,885,744
$1,279,066 $819,680
$2,098,746
$287,640 $3,304,713 $3,592,353
$10,824 $10,824
$10,824 $10,824

382

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2015 Total: FY 2017 Total: Lanier STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2017 Total: Laurens STIP Totals:
FY 2015 Total: Lee STIP Totals:
FY 2015 Total: FY 2017 Total: Lincoln STIP Totals:
FY 2015 Total: Lumpkin STIP Totals:
FY 2017 Total: FY 2018 Total: Macon STIP Totals:
FY 2015 Total: Madison STIP Totals:

Federal $

State $

Lanier

$886,176

$221,544

$2,665,799

$666,450

$3,551,975

$887,994

Laurens

$3,234,438

$808,610

$0

$0

$8,059,238

$2,014,810

$11,293,676

$2,823,419

Lee

$1,153,479

$288,370

$1,153,479

$288,370

Lincoln

$253,574

$4,220,381

$3,694,360

$923,590

$3,947,933

$5,143,971

Lumpkin

$40,553

$126,250

$40,553

$126,250

Macon

$118,799

$29,700

$2,397,410

$554,853

$2,516,209

$584,552

Madison

$1,160,054

$54,752,102

$1,160,054

$54,752,102

Other $
$0 $0 $0
$0 $32,473
$0 $32,473
$0 $0
$0 $0 $0
$1,132,517 $1,132,517
$0 $44,500 $44,500
$0 $0

Total $
$1,107,720 $3,332,248 $4,439,968
$4,043,048 $32,473
$10,074,048 $14,149,568
$1,441,848 $1,441,848
$4,473,954 $4,617,949 $9,091,904
$1,299,320 $1,299,320
$148,499 $2,996,763 $3,145,262
$55,912,156 $55,912,156

383

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2016 Total: Marion STIP Totals:
FY 2015 Total: McDuffie STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Meriwether STIP Totals:
FY 2015 Total: Miller STIP Totals:
FY 2016 Total: FY 2018 Total: Mitchell STIP Totals:
FY 2016 Total: Monroe STIP Totals:
FY 2017 Total: Montgomery STIP Totals:

Federal $

State $

Marion

$0

$0

$0

$0

McDuffie

$29,785,156

$11,603,276

$29,785,156

$11,603,276

Meriwether

$0

$375,000

$747,812

$186,953

$1,261,943

$315,486

$170,371

$42,593

$2,180,126

$920,031

Miller

$673,363

$168,341

$673,363

$168,341

Mitchell

$0

$0

$330,126

$82,531

$330,126

$82,531

Monroe

$81,878

$20,470

$81,878

$20,470

Montgomery

$25,224

$6,306

$25,224

$6,306

Other $
$21,649 $21,649
$0 $0
$0 $0 $0 $0 $0
$0 $0
$10,404 $0
$10,404
$0 $0
$0 $0

Total $
$21,649 $21,649
$41,388,433 $41,388,433
$375,000 $934,765 $1,577,428 $212,964 $3,100,157
$841,704 $841,704
$10,404 $412,657 $423,061
$102,348 $102,348
$31,530 $31,530

384

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2015 Total: FY 2016 Total: FY 2018 Total: Morgan STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Murray STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Newton STIP Totals:
FY 2015 Total: FY 2018 Total: Oconee STIP Totals:
FY 2015 Total: Oglethorpe STIP Totals:
FY 2016 Total: FY 2017 Total: Pickens STIP Totals:

Federal $

State $

Morgan

$40,000

$10,000

$6,029,359

$1,507,340

$9,267,267

$2,316,817

$15,336,626

$3,834,156

Murray

$244,897

$61,224

$848,134

$212,034

$10,296,583

$2,574,146

$340,744

$85,186

$11,730,357

$2,932,589

Newton

$490,307

$82,624

$14,196,340

$3,509,085

$716,925

$0

$7,319,402

$1,829,851

$22,722,975

$5,421,560

Oconee

$800,000

$200,000

$487,751

$121,938

$1,287,751

$321,938

Oglethorpe

$2,134,754

$533,689

$2,134,754

$533,689

Pickens

$935,221

$233,805

$8,713,597

$2,178,399

$9,648,819

$2,412,205

Other $
$0 $0 $0 $0
$0 $0 $0 $0 $0
$39,953 $40,000 $432,075
$0 $512,028
$0 $0 $0
$0 $0
$0 $0 $0

Total $
$50,000 $7,536,699 $11,584,083 $19,170,782
$306,121 $1,060,168 $12,870,728
$425,930 $14,662,946
$612,884 $17,745,425
$1,149,000 $9,149,253 $28,656,562
$1,000,000 $609,689
$1,609,689
$2,668,443 $2,668,443
$1,169,027 $10,891,997 $12,061,023
385

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2015 Total: FY 2016 Total: Pierce STIP Totals:
FY 2016 Total: Pike STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2018 Total: Pulaski STIP Totals:
FY 2015 Total: Putnam STIP Totals:
FY 2016 Total: Rabun STIP Totals:
FY 2016 Total: Randolph STIP Totals:
FY 2015 Total: FY 2016 Total: Spalding STIP Totals:

Federal $

State $

Pierce

$1,822,251

$0

$1,295,685

$217,027

$3,117,937

$217,027

Pike

$0

$0

$0

$0

Pulaski

$42,448

$10,612

$8,408,189

$2,012,057

$1,779,930

$444,983

$10,230,567

$2,467,652

Putnam

$40,000

$10,000

$40,000

$10,000

Rabun

$17,225,395

$4,306,349

$17,225,395

$4,306,349

Randolph

$0

$0

$0

$0

Spalding

$182,068

$0

$0

$0

$182,068

$0

Other $
$455,563 $149,706 $605,269
$10,824 $10,824
$0 $100,814
$0 $100,814
$0 $0
$101,714 $101,714
$10,824 $10,824
$45,517 $10,824 $56,341

Total $
$2,277,814 $1,662,418 $3,940,232
$10,824 $10,824
$53,060 $10,521,060
$2,224,913 $12,799,033
$50,000 $50,000
$21,633,458 $21,633,458
$10,824 $10,824
$227,585 $10,824
$238,409

386

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2015 Total: FY 2016 Total: Stephens STIP Totals:
FY 2016 Total: FY 2017 Total: FY 2018 Total: Stewart STIP Totals:
FY 2015 Total: Talbot STIP Totals:
FY 2016 Total: Taylor STIP Totals:
FY 2015 Total: FY 2016 Total: Telfair STIP Totals:
FY 2015 Total: Terrell STIP Totals:
FY 2016 Total: FY 2018 Total: Thomas STIP Totals:

Federal $

State $

Stephens

$152,592

$38,148

$1,215,808

$303,952

$1,368,400

$342,100

Stewart

$127,345

$31,836

$1,067,262

$266,815

$485,796

$121,449

$1,680,402

$420,101

Talbot

$22,296

$1,144,180

$22,296

$1,144,180

Taylor

$272,800

$0

$272,800 Telfair
$290,320

$0 $20,400

$2,235,773

$558,943

$2,526,092

$579,343

Terrell

$38,339

$0

$38,339

$0

Thomas

$215,977

$0

$10,674,060

$2,668,515

$10,890,037

$2,668,515

Other $
$0 $0 $0
$106,121 $0 $0
$106,121
$0 $0
$79,024 $79,024
$52,180 $0
$52,180
$9,585 $9,585
$84,023 $0
$84,023

Total $
$190,740 $1,519,760 $1,710,500
$265,302 $1,334,077
$607,244 $2,206,624
$1,166,476 $1,166,476
$351,824 $351,824
$362,900 $2,794,716 $3,157,615
$47,923 $47,923
$300,000 $13,342,575 $13,642,575

387

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2015 Total: FY 2016 Total: Tift STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2017 Total: Toombs STIP Totals:
FY 2015 Total: FY 2016 Total: Towns STIP Totals:
FY 2016 Total: FY 2017 Total: Troup STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2018 Total: Turner STIP Totals:
FY 2015 Total: FY 2016 Total: Twiggs STIP Totals:

Federal $
Tift $1,196,336

State $
$299,084

$4,604,475

$1,012,387

$5,800,811

$1,311,471

Toombs

$0

$17,622,958

$7,482,557

$1,870,639

$4,355,198

$1,088,799

$11,837,754

$20,582,396

Towns

$3,396,041

$849,010

$3,880,073

$970,018

$7,276,114

$1,819,029

Troup

$14,992,580

$3,748,145

$2,395,404

$598,851

$17,387,984

$4,346,996

Turner

$401,950

$0

$155,980

$0

$4,561,248

$1,140,312

$5,119,178

$1,140,312

Twiggs

$2,722,707

$680,677

$0

$0

$2,722,707

$680,677

Other $
$0 $144,346 $144,346
$0 $0 $0 $0
$0 $0 $0
$10,824 $0
$10,824
$132,628 $40,090 $0
$172,718
$0 $10,824 $10,824

Total $
$1,495,420 $5,761,208 $7,256,628
$17,622,958 $9,353,196 $5,443,997
$32,420,151
$4,245,051 $4,850,091 $9,095,142
$18,751,550 $2,994,255
$21,745,805
$534,578 $196,070 $5,701,560 $6,432,207
$3,403,384 $10,824
$3,414,208

388

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2016 Total: FY 2017 Total: FY 2018 Total: Union STIP Totals:
FY 2015 Total: FY 2017 Total: Upson STIP Totals:
FY 2015 Total: Walker STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2017 Total: Walton STIP Totals:
FY 2015 Total: FY 2016 Total: FY 2018 Total: Ware STIP Totals:
FY 2015 Total: FY 2017 Total: Warren STIP Totals:

Federal $

State $

Union

$32,314,507

$9,877

$17,161,000

$0

$4,907,240

$1,226,810

$54,382,746

$1,236,687

Upson

$9,887,472

$2,471,868

$7,915,418

$1,978,855

$17,802,890

$4,450,723

Walker

$1,655,347

$0

$1,655,347

$0

Walton

$204,677

$42,500

$1,509,748

$368,437

$1,879,200

$459,000

$3,593,625

$869,937

Ware

$53,020,293

$13,255,073

$16,117,007

$4,029,252

$3,135,589

$783,897

$72,272,889

$18,068,222

Warren

$1,398,400

$0

$6,612,249

$0

$8,010,649

$0

Other $
$0 $0 $0 $0
$0 $0 $0
$413,837 $413,837
$8,669 $9,000 $10,800 $28,469
$0 $520,200
$0 $520,200
$349,600 $2,637,062 $2,986,662

Total $
$32,324,383 $17,161,000
$6,134,050 $55,619,433
$12,359,340 $9,894,273
$22,253,613
$2,069,184 $2,069,184
$255,846 $1,887,185 $2,349,000 $4,492,031
$66,275,366 $20,666,459
$3,919,487 $90,861,311
$1,748,000 $9,249,311 $10,997,311

389

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2016 Total:

Federal $

State $

Washington

$0

$0

Other $
$10,824

Total $
$10,824

FY 2017 Total:

$3,258,565

$814,641

$0

$4,073,207

Washington STIP Totals: FY 2015 Total:

$3,258,565

$814,641

Wheeler

$176,653

$44,163

$10,824 $0

$4,084,031 $220,816

FY 2016 Total:

$0

$0

$44,940

$44,940

FY 2018 Total:

$197,055

$0

$49,264

$246,319

Wheeler STIP Totals: FY 2015 Total:

$373,708

$44,163

White

$15,612,321

$3,903,080

$94,204 $0

$512,075 $19,515,402

White STIP Totals: FY 2015 Total:

$15,612,321

$3,903,080

Wilkes

$23,064,161

$5,766,040

$0

$19,515,402

$0

$28,830,201

Wilkes STIP Totals: FY 2016 Total:

$23,064,161

$5,766,040

Worth

$311,960

$0

$0 $344,980

$28,830,201 $656,940

FY 2017 Total:

$8,945,014

$2,236,253

$676,200

$11,857,467

FY 2018 Total:

$8,379,679

$2,094,920

$0

$10,474,599

Worth STIP Totals:

$17,636,653

$4,331,173

$1,021,180

$22,989,007

STIP Grand Totals:

$3,034,987,341

$739,335,729

$135,683,299

$3,910,006,368

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

390

Appendix A
Glossary of terms
391

GLOSSARY OF TERMS
ATMS Advanced Transportation Management System: a computerized system that integrates video, voice, and data management functions to collect information about the transportation infrastructure and performance analysis as well as support traffic management decisions based on real-time information.
CMAQ Congestion Mitigation and Air Quality Improvement Program: directs funds primarily to areas that have failed to reach certain air quality standards. Projects allowed under this program include mass transit improvements and high-occupancy vehicle facilities.
CST Construction: phase of a project that includes the actual construction of the project.
DONOR STATE BONUS Donor states are states that contribute more to the Highway Trust Fund than they receive back in federalaid highway programs. These states receive a predetermined amount based on a comparison of a projection of all payments into the Highway Trust Fund and the amount received in federal-aid apportionments. Starting with the state with the lowest return, states are brought up to the level of return for states with the next higher level of return until available funds are depleted.
FED Share Federal Share: portion of funding to be paid for with federal money.
GARVEE Grant Anticipation Revenue Vehicle: bonds against anticipated federal funds for the purpose of accelerating the construction of the "Governor's Road Improvement Program".
GA Share Georgia Share: portion of funding to be paid for with state money.
GRVA GARVEE Advance: advance funding to pay for "Governor's Road Improvement Program" projects with GARVEE bond before converting to regular federal aid funding.
GRVC GARVEE Converted: funding to pay back the GARVEE bond.
HPP High Priority Project: list of 1,850 high priority projects specified by Congress in TEA-21. Funding for these projects totals $9.4 billion over the six years of TEA-21. Georgia will receive $283.87 million for 40 projects.
392

HIGHWAY TRUST FUND Federal account established by law to hold receipts collected by the government, earmarked for highway programs and a portion of the mass transit program; supported by the federal gasoline tax and other user taxes.
INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT of 1991 (ISTEA) Transportation authorization act approved by Congress in 1991.
METROPOLITAN PLANNING ORGANIZATION (MPO) Required by federal regulations in urbanized areas to develop transportation plans and programs; responsible for developing the Transportation Improvement Program (TIP).
MAP-21 Moving Ahead for Progress in the 21st Century; Most recent Transportation authorization act approved by Congress in 2012.
NEPA National Environmental Policy Act of 1969: requires federal government to use all practical means and measures to protect environmental values; makes environmental protection a part of the mandate of every federal agency and department.
NHS National Highway System: consists primarily of the Interstates and other major routes. Includes all urban and rural principal arterials.
NON-ATTAINMENT Areas that do not meet the national ambient air quality standards set by USEPA.
OBLIGATION CEILING The maximum amount that a state is expected to receive from the Highway Trust Fund.
OTH Share Other Share: portion of funding to be paid for with money other than federal or state funds; generally provided by local governments.
PE Preliminary Engineering: phase of a project that includes the development of the concept, survey, environmental documentation and design plans.
ROW Right of Way: phase of a project that includes the acquisition of any necessary property for the construction of the project.
SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act- A Legacy for Users; Transportation authorization act approved by Congress in 2005.
393

STATE AID LET Projects that are funded with state money.
STATE HIGHWAY SYSTEM Network of roads maintained by the state, including: road and bridge construction, maintenance, rehabilitation and restoration. There are approximately 17, 947 miles of state highways in Georgia which make up 16% of the total public road system in the state.
STP Surface Transportation Program: federal funding category that provides funding for projects on any federal-aid highway, including the NHS, bridge projects on any public road, transit capital projects, and public bus terminals and facilities.
TRANSPORTATION EQUITY ACT FOR THE 21ST CENTURY (TEA-21) A six-year transportation authorization act approved by Congress in 1998.
TRANSPORTATION INVESTMENT ACT (TIA) A 2012 Referendum was passed by Georgia voters in the regions of Central Savannah River Area, Heart of Georgia Altamaha, and River Valley. These three regions have implemented a one-percent regional sales tax over a ten year period to fund transportation improvements. Georgia DOT is responsible for the management of the budget, schedule, execution and delivery of all projects contained in the approved investment lists. Georgia DOT is collaborating with local and state agencies to ensure timely delivery of TIA projects, with a structure that focuses on high-level project management, intergovernmental coordination, transparency and successful program delivery.
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) In metropolitan areas over 50,000 in population, a program of federally funded transportation projects proposed to be carried out in the first three years of adoption by the MPO. There are 16 urbanized areas in Georgia Chattanooga, Dalton, Rome, Athens, Gainesville, Augusta, Savannah, Hinesville, Brunswick, Macon, Columbus, Albany, Valdosta, Atlanta, Cartersville* and Warner Robins. The TIPs are incorporated into the STIP as adopted by the respective governments and approved by the Governor, with no changes. *The Cartersville MPO's project phases will remain in the STIP until the adoption of their initial transportation planning documents (TIP, LRTP).
TYPE WORK category of project and source of funding ATM/ITS - Advanced Transportation Management/Intelligent Transportation System; work relating to computerized transportation system that supports traffic management decisions; commonly known as the NAVIGATOR System. Bicycle/Ped. Facility - generally bike/pedestrian path/lane funded through a Transportation Enhancement Activity (TEA) project. Bridges - lump sum funding identified for bridge maintenance or bridge painting. Bridge Painting - lump sum for bridge painting. Bridge Rehab - bridge rehabilitation work that will improve and/or widen an existing bridge.
394

Capital - funding identified for the purchase of transit related items. Historic Preservation - restoration or rehabilitation of historic structures that have a direct linkage to the transportation system; funded as part of a Transportation Enhancement Activities (TEA) project. Interchange - work at an interchange. Intersection Improvement - work that will improve an existing intersection. Landscaping - purchase/installation of shrubbery, plants, trees, etc. Lighting - lump sum funding for purchase/installation of lighting along a National Highway System road. Miscellaneous Improvements - identified for various projects that are not necessarily covered by a standard category. New Construction - new roadway construction on new location. Operating: funding identified for the operation of transit systems. Passing Lanes -- passing lanes added along an existing roadway. Preliminary Engineering - the design phase of a project. Ramp - construction work on a ramp at an interchange. Realignment - improvements to the geometry of a roadway. Replace Bridge - construction of a new bridge to replace an existing bridge. Rest Area - construction of rest areas along state routes (Interstates). Resurface and Maintenance - re-paving of a roadway and minor improvements. RR Xing - improvements to a road/rail crossing, such as the installation of gates, bells, lights, or improvements to the crossing itself. Safety - work that is designed to reduce accidents. Shoulder Work - improving and/or widening shoulders on a roadway. Sidewalks - installation of sidewalk. Signals - installation and/or improvement of signals. Signing - fabrication/installation of roadway signs. Special Studies - lump sum funding for planning and management studies. Turn Lanes - addition of turn lanes at intersections. Water Pollution Mitig. - lump sum funding for wetland mitigation site that were taken by roadway construction. Weigh Station - construction and/or rehabilitation of truck weigh stations. Widening - adding additional travel lanes to a roadway.
395

Appendix B
Maps
Georgia's Rail System Map Existing Urban and Rural Transit Programs Map
State Bicycle System Map Governor's Road Improvement Program Fact Sheet and Map
Georgia's Statewide Designated Freight Corridor Map State Freight Network STIP Map
Georgia Department of Transportation District Map Georgia Congressional Districts Map
396

Operating

Inactive Shortline Railroad Name

Chattanooga

NS CCKY

Hedges

Dalton

McCaysville

Mineral Bluff

Blue Ridge Chatsworth White Path

CSX Norfolk Southern
Shortlines GDOT Owned

ABR

Athens Branch
Chattahoochee & Gulf Chattahoochee Industrial Chattooga & Chickamauga First Coast Fulton County Georgia Central

CCKY

LaFayette

Ellijay

GNRR

Toccoa

Completed GDOT Rehab Projects

Georgia Dept of Transportation CaterParrott Railnet Georgia Southern

Summerville Calhoun Lyerly

Jasper Tate

Rome

Canton Cartersville

Gainesville

HRT

Lula

Bowersville HRT

Commerce

Hartwell Goss HRT

Last 10 years Prior to 2000
Current Projects Underway
Acquisition Rehabilitation
Potential Abandonments

Georgia Northeastern Georgia Southwestern GWRC Georgia Woodlands GRWR Great Walton GITM* Golden Isle Terminal* HOG Heart of Georgia HRT Hartwell LW Louisville & Wadley

Cedartown

Rockmart

Marietta

Edna Atlanta

Austell

Winder

Center

Athens
Monroe Bishop

Elberton

Known Trails

RSOR Riceboro Southern SAN Sandersville SAPT**Savannah Port Terminal** SM St. Mary's
St. Mary's West

FCR GRWR SCS GWRC

VR Valdosta

Bremen Carrollton

Union City

Social Circle Covington

Madison

Washington

SCS Squaw Creek Southern * GITM aka CISD Colonel's Island

Wansley Newnan

Jonesboro

NS McDonough

Senoia

Griffin

Machen Eatonton
Monticello

Barnett Camak Warrenton
Sparta

Hephzibah

** SAPT aka SSDK Savannah State Docks
Augusta

Rover

LW
SCS GS

LaGrange

Barnesville

Wayside

Milledgeville

Wrens

Waynesboro

West Point

Durand

Thomaston

Manchester

Macon

Junction City

Roberta

Fort Valley

Warner Robins

Mogul GCR

Gordon

SANSandersville Tennille

Louisville Wadley Midville

HOG

Wrightsville Swainsboro

Millen Dover

Sylvania ORC

Mahrt

Columbus

GSWR

GSWR

Cusseta

GS Perry Montezuma

Cochran

Dublin
GCR

HOG

Kirby
Statesboro
Metter

Ardmore

Omaha HOG Georgetown
White GSWR House
Cuthbert
GSWR Hilton
Saffold

GSWR

Richland Preston

Americus

Vienna

HOG

Cordele
HOG

Smithville Dawson GSWR

Cedar Creek

Rochelle

GSWR Sasser
Arlington GSWR

Albany
Sylvester GFRR

Tifton

Fitzgerald

HOG Helena Hazlehurst
Douglas

GDOT

Vidalia
GCR
Hester

Claxton

Pembroke

Savannah

Richmond Hill

SAPT GITM

RSOR

Surrency Jesup

Riceboro

GFRR

Camilla Colquitt

GFRR GFRR

Moultrie

Sparks GFRR

Willacoochee CPR
Adel

Pearson SMWR
Waresboro

Nahunta
Waycross

Everett

GITM

Brunswick

GSWR CIRR

Lynn

Coolidge

CPR

Bainbridge

Thomasville Metcalf

GFRR

Quitman Clyattville

VR

Dupont
Valdosta

Fargo

FCRD

Folkston

Seals Kings Bay

Kingsland

SM St. Mary's

N

Moniac

St. George

Last Updated: September 13, 2012 Visit us at: WWW.DOT.GA.US Or Search for us online, enter: "GDOT RAIL"

397

State of Georgia
Urban and Rural Public Transit Programs 2013

Dade

Catoosa

Fannin

WhitfieldMurray

Towns Rabun Union

Walker

Gilmer

WhiteHabersham

Chattooga

Lumpkin

Stephens

Gordon Pickens Dawson

Hall Banks Franklin Hart

Floyd Bartow Cherokee Forsyth

Urban Transit Program
No Transit Service Rural Transit Program
Regional Urban Transit Program (May not include entire county) City Programs

Jackson Madison Elbert

Polk Paulding Cobb
Haralson

Gwinnett Barrow Clarke

DeKalb

Oglethorpe

Oconee

Walton

Wilkes

Lincoln

Douglas Fulton

Rockdale

Carroll

Clayton

Morgan Newton

GreeneTaliaferro

Columbia

Henry

McDuffie

Fayette

Coweta Heard

Spalding Butts Jasper Putnam

Warren Hancock Glascock

Richmond

Troup

Meriwether

Pike

Lamar Monroe

Baldwin Jones

Jefferson Washington

Burke

Upson

Harris

Talbot

Bibb

Wilkinson

Crawford

Twiggs

Johnson

Jenkins Screven

Muscogee ChattahoocheeMarion

Taylor

Peach

Houston Bleckley

Macon

Emanuel

Laurens Treutlen

Candler Bulloch Effingham

Schley
Stewart Webster Sumter
Quitman Terrell Lee
Randolph

Dooly Crisp

Pulaski Wilcox

Dodge

Montgomery Wheeler Toombs

Evans

Tattnall

Telfair

Bryan

Turner

Ben Hill

Jeff Davis Appling

Liberty Long

Chatham

/

Clay Calhoun Dougherty Worth

Irwin

Tift

Coffee

Early

Baker

Miller

Mitchell

Colquitt

Berrien Atkinson Cook

Seminole Decatur Grady Thomas Brooks

Lanier Lowndes

Clinch

Bacon

Wayne

McIntosh

Pierce

Brantley

Glynn

Ware

Charlton

Camden

Echols

398

399

6

1

7

2 3

5 4



Georgia Department of
Transportation State Bicycle System

LEGEND
STATE BIKE ROUTES SCENIC BYWAYS STATE ROUTES COUNTY BOUNDARY
GDOT DISTRICTS District Number
1 2 3 4 5 6 7

0 15 30

60

90

120

Miles

The data used was provided "as is" and represents the information available and updated within GDOT at the date of issue. Every effort is made to provide accurate and reliable information, but it is still possible
that errors exist or the information has changed.

Georgia Department of Transportation
Fact Sheet
The Governor's Road Improvement Program (GRIP)

Definition

The Governor's Road Improvement Program, commonly referred to as GRIP, is a system of proposed economic developmental highways in Georgia. GRIP was originally adopted in 1989 by the Georgia General Assembly. Georgia law defines the following corridors as the GRIP:

Appalachian Developmental Highway South Georgia Parkway/US 82 US 319 Golden Isles Parkway Fall Line Freeway SR 72 Savannah River Parkway US 19 US 1/SR 17 US 27

US 441 US 84 Sunbelt Parkway/SR 133 Power Alley/US 280 East-West Highway SR 40 SR 32 SR 125 SR 15

GRIP was initiated in 1989 and originally consisted of 12 corridors with 2,845 miles of roadway, including 113 miles of truck access routes. During the 2001 and 2005 Legislative sessions, the General Assembly added new routes, including three truck access routes. The current length of the GRIP system has grown to 3,307 miles. The total length will continue to vary as alignments, including bypasses and shifts, are determined through the engineering process.

Purpose

Economic development highways traditionally receive strong support in Georgia. The purpose of the GRIP system explains why :
Connectivity in Rural Georgia: GRIP will connect 95% of Georgia cities with a population of 2,500 or more to the Interstate System and ensure that 98% of all areas in the state will be within 20 miles of a four-lane road.
Provide opportunities for growth: Several studies have provided evidence that GRIP fosters economic development.
Provide effective and efficient transportation for the growing statewide population
Safer travel in rural areas: Accidents occur three times more often on 2-lane highways than on multi-lane divided highways.

Visit www.dot.ga.gov for updates to this fact sheet.

400
GDOT GRIP System Fact Sheet, updated January 2014

Current GRIP Corridor Statistics

GRIP CORRIDOR Appalachian Developmental
Highw ay South Georgia Parkw ay/US 82
US 319 Golden Isles Parkw ay
Fall Line Freew ay
SR 72
Savannah River Parkw ay US 19
US 1/SR 17

TOTAL LENGTH (m iles)
60
262 72 168 215
45
156 194
331

COM PLETE OR UNDER
CONSTRUCTION (m iles)
58
262 72 168 215
20
156 194
170

US 27

352

328

US 441

371

196

US 84

259

235

Sunbelt Parkw ay/SR 133

66

0

Pow er Alley/US 280

238

4

SR 32

149

13

SR 40

29

13

East-West Highw ay

169

0

SR 15

149

0

SR 125

22

0

COM PLETE OR UNDER
CONSTRUCTION (pe r ce ntage ) 97%
100% 100% 100% 100% 44% 100% 100% 51%
93%
53%
91%
0%
2%
9% 45% 0% 0% 0%

CORRIDOR STATUS No Activity on Final 2
Miles Complete
Active Construction Complete
Active Construction Active Engineering and
Construction Active Construction Active Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
ROW acquisition Active Engineering on
27 miles only Active Engineering on
44 miles only Active Engineering
No Activity No Activity No Activity

REM AINING COST TO
COM PLETE (m illions)
$15.7
$0.0 $0.0 $0.0 $0.0 $154.1 $0.0 $0.0 $772.2
$377.5
$799.8
$110.7
$271.4
$1,399.6
$1,238.0 $57.8
$555.9 $917.8 $170.2

Subtotals for Original 1989 GRIP Cor r idor s :
Subtotals for Active & Com plete GRIP Corridors: Grand Totals for all GRIP
Cor r idor s :

2485 2967 3307

2074 2091 2104

83% 70% 64%

$2,230.0 $4,876.6 $6,840.7

Meeting the Challenge

GDOT is striving to complete the construction of the GRIP System. A strategy is in place that recognizes the

complexity of each of the three phases of project development:

Engineering (including environmental studies)

Right of way acquisition

Construction

These phases are not generally scheduled for completion in the same year, and in most cases a phase takes

several years to complete. Another consideration in scheduling each phase is the availability of funds. A

multiple-year funding program to accomplish the planning, design, right of way and construction of the GRIP

System is based on these considerations and the past funding history for GRIP projects.
Contact:

Office of Program Control 404-631-1523
401

Visit www.dot.ga.gov for updates to this fact sheet.

GDOT GRIP System Fact Sheet, updated January 2014

402

Georgia's Statewide Designated Freight Corridor

59 !(!(!(

tu441

Legend

Savannah

!(75

tu27

575

985

17

85

72

285!(!(!(

20

!( !(!(!(

!( l!(

!(

675

20 !(!(

tu27 85

75

17

520

109 Macon-LaGrange

tu441

F!(all Line Freeway

74

475 !(

185
Fall LineFreeway

tu1

!(

16

Statewide Freight Corridor

!(

Freight Rail Yards

| Sea Port
l HJAIA
Counties *Industrial Facilities by Number of Parking Spaces
55 - 125
126 - 350
351 - 1000

JimmyDeLoach Pkwy
95

0

5 Miles

21 307

!(

| Grange Rd

!( !(Brampton Rd

!(

!(

516

16

!(

Atlanta

!(

285

!( !(

tu27
0

75
!(
520
!(
133
tu84

tu441

| !(!(!(!(!(

tu82
tu84
!(

tu84
95

!( !(

tu82

tu1

!(
| !(

50

100 Miles

!(Austell
6

75 85
!( !(
20 !(

!(

Fairburn!(

85

0

5 Miles

!(
l
75

*Source: Georgia Statewide Freight & Logistics Plan, GDOT, 2012

403

DADE 59

CATOOSA WHITFIELD MURRAY

WALKER 27

FANNIN GILMER

UNION LUMPKIN

TOWNS

RABUN
441

HABERSHAM WHITE

STEPHENS

State Freight Network FY 2015 - 2018 STIP

CHATTOOGA FLOYD

GORDON
75
BARTOW

PICKENS

DAWSON

CHEROKEE
575

FORSYTH

BANKS

FRANKLIN

HART

Project Phases

HALL

85

Project data as of 8/11/2014

441 JACKSON

MADISON

ELBERT 72

POLK 27
HARALSON

PAULDING

COBB

20
DOUGLAS

FULTON

GWINNETT

BARROW

DEKALB ROCKDALE

WALTON

CLARKE OCONEE

OGLETHORPE

17
WILKES

LINCOLN

CARROLL

CLAYTON

NEWTON

MORGAN

GREENE TALIAFERRO 20

COLUMBIA

27
HEARD

COWETA
85

FAYETTE

HENRY

SPALDING

BUTTS
75

JASPER

PUTNAM
441

HANCOCK

WARREN MCDUFFIE
GLASCOCK

RICHMOND

TROUP

MERIWETHER
109

185

PIKE

LAMAR

MONROE

UPSON 74

HARRIS

TALBOT

CRAWFORD

Fall Line

JONES

BALDWIN

Fall Line
WASHINGTON

JEFFERSON

BIBB

WILKINSON TWIGGS

1
JOHNSON

BURKE JENKINS

MUSCOGEE

TAYLOR

PEACH HOUSTON

BLECKLEY

EMANUEL
LAURENS 16 TREUTLEN

CANDLER

CHATTAHOOCHEE MARION

MACON

SCREVEN BULLOCH

EFFINGHAM

SCHLEY

STEWART

WEBSTER

SUMTER

QUITMAN

27

RANDOLPH

TERRELL

LEE

82

DOOLY

PULASKI

DODGE

MONTGOMERY

WHEELER

TOOMBS

EVANS

BRYAN

WILCOX

CRISP

75
TURNER

BEN HILL

TELFAIR
441

JEFF DAVIS

TATTNALL
1APPLING

LIBERTY LONG

CHATHAM

CLAY

CALHOUN

DOUGHERTY

EARLY MILLER

BAKER MITCHELL

WORTH
133
COLQUITT

IRWIN

TIFT

82

BERRIEN

COOK

COFFEE ATKINSON

BACON

WAYNE
84

MCINTOSH
95

PIERCE

GLYNN 82
BRANTLEY

84
SEMINOLE

DECATUR

GRADY

THOMAS 84

BROOKS

!

LANIER

CLINCH

!
LOWNDES

441

!

ECHOLS

!

WARE

1
CHARLTON

CAMDEN

Draft STIP 2015-2018 Phases* Current Activity*

Preliminary Engineering

Under Construction

Right of Way

2 Lanes - No Activities in 15-18 STIP



Construction

4+ Lanes - No Activities in 15-18 STIP

*Projects include capacity improvements, interchanges, and variable speed limit signs

0 10 20

40

Miles

60

80



Georgia Department of Transportation District Map

Dade

Catoosa

Walker

Whitfield Murray

Fannin Gilmer

Union

Chattooga Floyd

Gordon
6
Bartow

Pickens

Lumpkin Dawson

Cherokee

Forsyth

Towns

Rabun

White

Habersham Stephens

Banks Franklin Hall

1 Jackson

Madison

Hart Elbert

Polk Haralson

Paulding

Cobb
7

Douglas Fulton

Gwinnett DeKalb

Barrow Walton

Clarke Oconee

Oglethorpe

Wilkes

Lincoln

Carroll Heard

Coweta

Clayton

Rockdale Newton

Morgan

Greene Taliaferro

Columbia

McDuffie

Fayette

Henry

Spalding

Butts

Jasper

Putnam

Hancock

Warren Glascock

Richmond

Troup

Meriwether Pike

Lamar Monroe

Jones

Baldwin

2
Washington

Jefferson

Burke

Harris

Upson

3 Talbot

Crawford

Bibb

Wilkinson

Twiggs

Johnson

Jenkins

Screven

Muscogee

Taylor

Chattahoochee Marion Schley

Macon

Stewart

Webster

Sumter

Quitman

Peach Houston

Bleckley

Dooly

Pulaski

Dodge

Crisp

Wilcox

Randolph Terrell

Lee

Turner

Ben Hill

Emanuel

Laurens

Treutlen

Candler

Bulloch

Effingham

Montgomery

Wheeler

Telfair

Jeff Davis

Toombs Appling

Evans
Tattnall
5
Long

Bryan Liberty

Chatham

Clay

Calhoun

Dougherty

Early Miller

Baker Mitchell

Worth
4
Colquitt

Irwin Tift
Berrien Cook

Coffee Atkinson

Bacon

Wayne

Pierce

Ware

Brantley

McIntosh Glynn

Seminole Decatur

Grady

Thomas

Lanier

Brooks

Lowndes

Clinch

Charlton

Camden

Echols

0 15 30

60 Miles



Source: Georgia Department of Transportation

405

Georgia Congressional Districts Map

Dade

Catoosa

Walker

Whitfield Murray

Fannin Gilmer

Union

Towns

Rabun

Habersham White

Chattooga

Gordon

Pickens

Lumpkin Dawson

9

Stephens

Floyd
14

Bartow
11

Cherokee

Forsyth

Hall

Banks Franklin Hart

Jackson

Madison

Elbert

Polk

Paulding

Cobb

6

7
Gwinnett

Barrow

Clarke

Oglethorpe

Oconee

Haralson Carroll

Douglas

DeKalb
Fulton 5

4

Walton

13

Clayton

Rockdale Newton

Morgan

Wilkes Greene Taliaferro

Lincoln Columbia

Heard

Fayette

Henry

Coweta

3

Spalding

Butts

Jasper

Putnam

10
Hancock

McDuffie Warren
Glascock

Richmond

Troup

Meriwether Pike

Lamar Monroe

Jones

Baldwin

Jefferson Washington

Burke

Harris

Upson

Bibb

Wilkinson

Talbot

Crawford

Twiggs

Johnson

Jenkins

Screven

Muscogee

Taylor

Chattahoochee Marion Schley

Macon

Stewart

Webster

Sumter

Quitman

Peach Houston

Bleckley

Dooly

Pulaski

Dodge

Crisp

Wilcox

Randolph Terrell

Lee

Turner

Ben Hill

Emanuel

Laurens

Treutlen 12

Candler

Bulloch

Effingham

Montgomery

Wheeler

Telfair

Jeff Davis

Toombs

Evans Tattnall

Bryan

Chatham

Appling

Liberty Long

Clay Early

Calhoun 2 Dougherty
Baker

Miller

Mitchell

Worth Colquitt

Irwin
Tift
8 Berrien
Cook

Coffee Atkinson

Bacon

Wayne

Pierce

1

Ware

Brantley

McIntosh Glynn

Seminole Decatur

Grady

Thomas

Lanier

Brooks

Lowndes

Clinch

Charlton

Camden

Echols

0 15 30

60 Miles



406