Please send any comments to: Ryan Walker STIP Project Manager Email STIPCoordinator@dot.ga.gov Georgia Department of Transportation Office of Planning 600 W Peachtree Atlanta, Georgia 30308 Phone (404) 631-1987 2 3 FY 2015-2018 State Transportation Improvement Program Section I. II. III. IV. V. Page(s) 5 9 11 12 13 VI. 16 VII. 32 VIII. 38 IX. 39 X. 40 XI. 41 Appendix A Appendix B 391 396 397 398 399 400 402 403 404 405 406 Content Introduction and Overview Public Involvement Process Georgia's Transportation Leadership Governor's Strategic Goals for Georgia Metropolitan Planning Organizations (MPO) Map Georgia MPO Contact List Financial Plan STIP Amendment Process Lump Sum Funding MPO Lump Sum Process STIP Funds by Category Pie Chart Understanding STIP Entries Map of Georgia Index of Counties STIP Projects by County, Individually numbered Glossary of terms Maps Georgia's Rail System Map Existing Urban and Rural Transit Programs Map State Bicycle System Map Governor's Road Improvement Program (GRIP) Fact Sheet and Map Georgia's Statewide Designated Freight Corridor Map State Freight Network STIP Map Georgia Department of Transportation District Map Georgia Congressional Districts Map 4 Section I. Statewide Transportation Improvement Program Introduction We are pleased to present the Statewide Transportation Improvement Program (STIP) for Fiscal Years 2015 through 2018. The STIP lists Federally-funded transportation projects that are located outside Metropolitan Planning Organization (MPO) boundaries. Each MPO develops its own Transportation Improvement Program (TIP) and questions about projects in those areas of the state may be directed to the individual MPO shown in the MPO Contacts section of this STIP. The TIPs are included in the STIP by reference without modification once approved by the MPO and the Governor or his designee. Purpose In order to receive Federal transportation project funds, the Georgia Department of Transportation (GDOT) develops the STIP. The STIP lists all highway, public transit, and multimodal projects proposed for funding under Title 23 (highways) and Title 49 (transit) of the U.S. Code. The STIP includes Highway, Bridge, Bicycle, Pedestrian, Safety, Transportation Alternative Program Activities and Public Transportation (transit) projects. Project-related costs, such as preliminary engineering (PE), right-of-way acquisition (ROW), construction (CST) and utilities (UTL) are shown for highway projects; capital and operating costs are shown for transit projects. The projects are organized in alphabetical order by county with information on cost, description and fiscal year. Projects that extend into multiple counties are shown in the STIP under each county the project enters. Please see "Understanding STIP Entries" in Section IX for detailed information on how to read STIP entries. Development The STIP is developed under the framework of the 2010-2030 Statewide Strategic Transportation Plan (SSTP) in an effort to coincide with the Governor's Strategic Goals for Georgia and to achieve the outlined goals of: Supporting Georgia's economic growth and competitiveness; Ensuring safety and security; Maximizing the value of Georgia's assets; and Minimizing impact on the environment. 5 This year's STIP makes great strides in the effective movement of freight around the state. Widening corridors designated on the Statewide Freight Corridor Network see Appendix B and key connections to the interstate will improve the flow of freight throughout the state. There are also numerous congestion relief projects including several state route widenings and bypasses. The 2010-2030 SSTP is available online at: www.dot.ga.gov/SSTP-SWTP. Projects listed in this document were identified through GDOT's ongoing planning processes and are vital to the state's transportation program. Projects in the STIP emphasize the maintenance, safety, and improvement of existing transportation facilities and public transportation systems. The projects support GDOT's mission to provide a safe, seamless and sustainable transportation system that supports Georgia's economy and is sensitive to its citizens and environment. This STIP serves as a document to provide all citizens and interested stakeholders with the opportunity to review and comment on the state's transportation priorities for the next four fiscal years. Additionally in the non-MPO areas which the STIP covers, projects are identified in direct cooperation with rural (non-MPO) local governments through formal, annual face-to-face meetings with GDOT as well as regular/ongoing informal contact with GDOT throughout the rest of the year. It is also developed with input from stakeholders and the general public. The STIP was developed under all relevant guidelines provided by the Transportation Equity Act for the 21st Century (TEA-21), passed by Congress in 1998 and has continued with the Moving Ahead for Progress in the 21st Century Act (MAP-21) passed by Congress in 2012. The STIP is submitted to the Federal Highway Administration and Federal Transit Administration for final approval. Public Involvement Through direct contact with local elected officials, as well as stakeholders and the general public, the STIP is presented for consideration and comments throughout its development. In addition to the face-to-face meetings with local elected officials, the STIP is presented at public meetings held around the state by GDOT staff that encourages questions and input. These meetings are held at various locations and are advertised through mailings and press releases. Comments and questions can also be submitted by mail, e-mail and telephone/fax directly to GDOT staff at any time throughout the year. The STIP is also available on the internet at: www.dot.ga.gov/stip 6 Funding The STIP is fiscally balanced and includes only those projects with funding available or having a reasonable expectation to obtain funds. Federal funds for fiscal years 2015, 2016, 2017 and 2018 are program estimates and will not be final until after the Federal budget is implemented on October 1st of each year. Cost estimates for individual projects are based on the best available engineering estimates. These costs may change as a project progresses from preliminary engineering to the purchase of right of way to construction. If a cost estimate results from a change in the original scope of the project, the STIP will be amended including the necessary public involvement. If an increased cost estimate is based on updated engineering estimates rather than a change in the actual work, no amendment to the STIP is necessary. Greater detail may be found in the Financial Plan in Section VI. The most current Census data (2010) indicates that Georgia's population growth rate from 2000 to 2010 was 18.3%, which is more than double the U. S. average population growth of 9.7% over the same time period. Georgia's economy is also growing, leading to increased demands on the transportation system. The STIP process ensures that maximum benefits are received from available funding and that Georgia's transportation system will continue to support and promote Georgia's growth and economy. Based on the National Cooperative Highway Research Program (NCHRP Project 20-24 (37)), Georgia invests less per capita in transportation than most other states. Despite this fact, Georgia ranks 1st for construction projects on budget at 85% and ranks 2nd for construction projects delivered on time at 85%. Georgia's ranking is based on a 39-state study. Project List The continued emergence of the Port at the Savannah complex as one of the leading container ports in the United States has provided Georgia a great strategic transportation asset, giving the State a larger role in global trade. Savannah's growth has introduced a range of economic development opportunities, particularly for distribution, warehousing, and manufacturing. Freight volumes, mostly in the form of containers handled by the Savannah Port Complex, have a direct impact on Georgia's highway and rail networks. As such, the State of Georgia, in cooperation with the Coastal Area (Savannah) Metropolitan Planning Organization and Georgia Ports Authority, is pursuing several projects to accommodate and efficiently serve freight volumes moving throughout Georgia and the region. 7 For example, freight-supportive highway projects pursuing Federal funds are reflected in this FY 2015-2018 STIP document, as well as in the Savannah MPO's 2015-2018 TIP (which is incorporated via reference), to support the continued growth and activity expected at the Port of Savannah complex. The STIP is fiscally balanced such that it lists project phases expected for the fiscal year shown. It is worth noting that project schedules are subject to many issues and events between project conception and project conclusion that may impede or accelerate their progress. Project cost estimates are based on latest and best available engineering estimates at the time the STIP is being developed; the final cost for a project phase may be revised over time as the project is refined during its progression to construction. Conclusion The Department of Transportation wishes to thank all of the citizens and local officials for taking the time to provide input on the development of this program. Comments and questions may be directed to the person listed on the inside front cover of the STIP. 8 Section II. Public Involvement Process Background on the Statewide Transportation Improvement Program Federal legislation requires that each state produce a Statewide Transportation Improvement Program (STIP). The STIP lists federally funded transportation projects for the next four years, and is updated and approved on an annual basis. A major component of the STIP development process is public involvement. The Office of Planning oversees the STIP public involvement process for the six rural GDOT Districts and distributes the STIP to the Districts for use in their public meetings and meetings with local officials. Public meetings Annual public meetings are scheduled to provide an opportunity for public review and comment. All of the public meetings are held in ADA accessible locations. In 2014, ten public meetings were scheduled on the following dates: August 25 Waycross August 26 Jasper August 28- Cartersville September 2 - Tifton September 4 Elberton September 4 - Dublin September 8 - Americus September 9 - Statesboro September 9 - Thomson September 11 - LaGrange The Department invites large numbers of customers to these meetings. The Department mailed over 3,000 individual invitations to local officials and the Family of Partners, a group of stakeholders with interest in transportation. Ads were placed and press releases sent to local newspapers publicly announcing STIP meetings. Radio ads were aired and legal ads were placed in all Legal Organs in the state. An informational flyer explaining the STIP process has also been published and distributed at the public meetings. 9 Meetings with Local Officials Every year as part of the STIP development process, the District Planning and Programming Engineers meet with the elected officials from each rural county in their area to discuss proposed projects in the STIP to solicit comments and questions. During these meetings, a range of transportation issues are discussed and requests are forwarded to the appropriate DOT office for response. Local officials sign a "Certification of Cooperation with Elected Officials" documenting STIP consultation. STIP on the Web The Department makes the STIP available to citizens on the Department's web page. The web address for the Georgia STIP is: www.dot.ga.gov/stip Contact information is also included on this site for citizen's comments. Comments Comments received from the public meetings and the meetings with locals are taken into consideration in the development of the STIP and any comments received are answered or forwarded to the appropriate GDOT office for response. The comments and questions received from the public meetings and the meetings with the local officials ranged from general comments such as the need for more public transit routes to project specific questions, such as when is a particular project scheduled for construction. Additional Comments can be sent using the contact information below: Mailing Address: Georgia Department of Transportation Attn: Office of Planning/STIP Project Manager 600 W. Peachtree ST NW Atlanta, Georgia 30308 Email: stipcoordinator@dot.ga.gov In the fifteen previously established metropolitan areas of the state, public involvement is the responsibility of the local metropolitan planning organizations (MPOs); for questions about projects located in these areas, please contact the corresponding agency in Section V (following the MPO map). The area represented by the new Cartersville-Bartow County MPO, which was designated in 2013, will remain in the STIP until the new MPO adopts their initial transportation planning documents (TIP, LRTP). 10 Section III. Georgia's Transportation Leadership Governor Deal approved the STIP on September 15, 2014. The Governor has taken an active role in ensuring the state has a plan that provides vision, direction, and priorities by developing the Governor's Strategic Goals for Georgia located on the following page. The Georgia DOT is currently governed by a 14-member State Transportation Board, which Georgia Governor Nathan Deal provides leadership and sets policies for the Department. The Board is entrusted with powers that include, but are not limited to: naming the Commissioner; designating which public roads are encompassed within the state highway system; approving long-range transportation plans; overseeing the administration of construction contracts; and authorizing lease agreements. Board Members are elected by a majority of a General Assembly caucus from each of Georgia's fourteen congressional districts. Each board member serves a five-year term. 1st Congressional District 2nd Congressional District Ann Purcell Johnny Floyd 3rd Congressional District 4th Congressional District Robert L. Brown Jr. Sam Wellborn Secretary 5th Congressional District Stacey Key 6th Congressional District Dan Moody 7th Congressional District Rudy Bowen 8th Congressional District Jay Shaw 9th Congressional District Emily Dunn Vice Chairman 10th Congressional District Jamie Boswell 11th Congressional District Jeff Lewis 12th Congressional District Don Grantham Chairman 13th Congressional District Dana Lemon 14th Congressional District Roger Williams GDOT Commissioner Keith Golden GDOT Planning Director Toby Carr 11 Section IV. 12 Section V. Georgia Metropolitian Planning Organizations (MPO) Chattanooga Dalton Cartersville Gainesville Rome Atlanta Athens Augusta Columbus Macon Warner Robins Albany Valdosta 0 25 50 100 Miles Savannah Hinesville Brunswick *Newly designated Cartersville-Bartow County MPO's project phases will remain in the STIP until the adoption of their initial transportation planning documents (TIP, LRTP). 13 Georgia Metropolitan Planning Organization (MPO) Contact List Albany (DARTS) Dougherty Area Regional Transportation Study Website: http://dartsmpo.org/ Address: Albany-Dougherty Planning/Comm. Dev. 240 Pine Avenue, Suite 300 Albany, Georgia 31701 Contact: Jennifer Newton, Transportation Planner Phone: (229) 446-2730 Email: jnewton@dougherty.ga.us ------------------------------------------------------------Athens (MACORTS) Madison-Athens-ClarkeOconee Transportation Study Website: www.macorts.org Address: Athens-Clarke Co. Planning Commission 120 W. Dougherty St. Athens, GA 30601 Contact: Sherry F. McDuffie, Transportation Planner Phone: (706) 613-3515 Email: macorts@athensclarkecounty.com --------------------------------------------------------------Atlanta (ARC) Atlanta Regional Commission Website: www.atlantaregional.com Address: 40 Courtland St. NE Atlanta, GA 30303 Contact: John Orr, Manager, Transportation Access and Mobility Division Phone: (404) 463-3265 Email: jorr@atlantaregional.com ------------------------------------------------------------Augusta (ARTS) Augusta Regional Transportation Study Website: www.augustaga.gov/index.aspx?nid=680 Address: Augusta Planning and Development Department 525 Telfair St. Augusta, GA 30901-5867 Contact: Paul DeCamp, Planning Director Phone: (706) 821-1796 Email: pdecamp@augustaga.gov --------------------------------------------------------------Brunswick (BATS) Brunswick Area Transportation Study Website: www.glynncounty.org/ Address: Glynn Co. Community Development 1725 Reynolds St, Ste. 200 Brunswick, GA 31520 Contact: Eric Johnson, Planning Manager Phone: (912) 554-7434 Email: ejohnson@glynncounty-ga.gov ------------------------------------------------------------- Chattanooga (CUATS) Chattanooga Urban Area Transportation Study Website: www.chcrpa.org Address: Chattanooga-Hamilton Co. Regional Planning Agency 1250 Market St., Ste. 2000 Chattanooga, TN 37402-2713 Contact: Karen Rennich, MPO Coordinator Phone: (423) 643-5903 Email: rennich_karen@chattanooga.gov ------------------------------------------------------------Cartersville Bartow Bartow County Community Development Department Website: http://www.bartowga.org/index.php/communityservices/eviron-main/93-bartowadministration/community-development/675-mpo Address: 135 West Cherokee Avenue Suite 124 Cartersville, GA 30120 Contact: Toms Sills, Transportation Planner Phone: (770) 607-6265 Email: sillst@bartowga.org ------------------------------------------------------------Columbus (CPCTS) Columbus-Phenix City Transportation Study Website: www.columbusga.com/mpo/ Address: Columbus Dept. of Engineering Transportation Planning Division 420 10th St. Columbus, GA 31902 Contact: Lynda Temples, Planner Phone: (706) 225-3938 Email: ltemples@columbusga.org ------------------------------------------------------------Dalton Dalton MPO Website: www.whitfieldcountyga.com/eng/mpo.htm Address: Whitfield County 301 W. Crawford St., Dalton, GA 30722 Mailing: P.O. BOX 248 Dalton, Georgia 30722 Contact: Jacob Bearden, GDMPO Coordinator Phone: (706) 876-2592 Email: jbearden@whitfieldcountyga.com ------------------------------------------------------------- 14 Gainesville (GHTS) Gainesville Hall Transportation Study Website: www.ghmpo.org Address: Hall County Government Center, Department of Planning 2875 Browns Bridge Rd. Gainesville, GA 30504-5635 Contact: Sam Baker, Senior Planner Phone: (770) 531-6809x257 Email: sbaker@hallcounty.org ------------------------------------------------------------- Hinesville (HAMPO) Hinesville Area MPO Website: http://thelcpc.org/HAMPO/hampo_index.html Address: Hinesville Area MPO 100 Main Street, Suite 7520 Hinesville, GA 31313 Contact: Nils Gustavson, Planner Phone: (912) 408-2030 Email: ngustavson@thelcpc.org ------------------------------------------------------------Macon (MATS) Macon Area Transportation Study Website: www.maconbibbpz.org Address: Macon-Bibb Co. Plan. & Zoning Comm. 682 Cherry St., Ste. 1000 Macon, GA 31201 Contact: Don Tussing, Principal Planner Phone: (478) 751-7460 Email: dtussing@mbpz.org ------------------------------------------------------------Rome (FRUTS) Floyd-Rome Urban Transportation Study Website:http://www.romefloyd.com/Infrastructure/ PlanningandZoning/tabid/333/Default.aspx Address: Rome-Floyd Co. Planning Commission PO Box 1433 Rome, GA 30162-1433 Contact: Sue Hiller, Executive Director Phone: (706) 236-5025 Email: shiller@romega.us ------------------------------------------------------------Savannah (CORE MPO) Coastal Region MPO Website: www.thempc.org Address: Metropolitan Planning Commission PO Box 8246 110 E. State St. Savannah, GA 31412-8246 Contact: Mark Wilkes, Dir. of Trans. Planning Phone: (912) 651-1477 Email: wilkesm@thempc.org ------------------------------------------------------------- Valdosta (VLMPO) Valdosta-Lowndes MPO Website: www.sgrc.us/transportation Address: Southern Georgia Regional Commission 327 West Savannah Ave. Valdosta, GA 31601 Contact: Corey Hull, Transportation Planner Phone: (229) 333-5277 Email: chull@sgrc.com ------------------------------------------------------------Warner Robins (WRATS) Warner Robins Area Transportation Study Website: http://www.wrga.gov/node/52 Address: Warner Robins Dept. of City Development 700 Watson Blvd. Warner Robins, GA 31093 Contact: Jessica Bird, Transportation Planner Phone: (478) 929-1936 Email: jbird@warnerrobingsga.gov ------------------------------------------------------------- *For additional information on Georgia's MPOs, Please visit the Georgia Association of Metropolitan Planning Organization's (GAMPO) website: www.gampo.org 15 Section VI. Georgia Department of Transportation STIP Financial Plan The Georgia Statewide Transportation Improvement Program (STIP) is developed in accordance with 23 Code of Federal Regulations (CFR) Section 450.216 and includes a priority list of highway, passenger rail and transit projects to be implemented (Section 630.106(a)(2)). The following describes transportation program estimates which financially constrain by year the STIP Financial Plan (SFP) for Fiscal 2015-2018. In order to provide for 23CFR Section 630.110, "Modification of Original Agreements," for project phases authorized (Section 630.106(a)(2)) under a previous STIP, the SFP reserves a portion of the funding for this purpose and allocates the remaining transportation revenues to state and local projects for a four year time period. The financial plan includes projects for which funding can reasonably be expected to be available. Only those projects or project phases (scoping, preliminary engineering, rights-of way, utilities or construction) for highway projects or (capital or operating) for transit projects are included in the STIP. The Fiscal 2015-2018 SFP was developed on the basis of current state and federal fund balances and projected 2015, 2016, 2017 and 2018 Federal-aid and state funding for each of the four years of the STIP. Also the Transportation Improvement Programs (TIP) and their related funding, developed by Georgia's fifteen Metropolitan Planning Organizations (MPO), are incorporated into the STIP by reference. The Fiscal 2015-2018 SFP for highways and transit totals $8.62 billion with a FY 2015 annual program of $2.07 billion. Funding for this four-year program includes $5.86 billion in federal funds, $1.29 billion in state funds, and $1.47 billion in local funds. This level of infrastructure investment supports jobs in the construction industry as well as a well-maintained transportation system that fosters a healthy economy by providing the infrastructure for efficient movement of goods and people. The project cost estimates used in developing the STIP are based on the best available engineering estimates at the time. Final cost for the actual project phase authorization may differ, right of way needs or design quantities are finalized through the pre-construction process. If changes due to these revisions alter the STIP description of intent, design, or scope of the project, then appropriate STIP amendment procedures, provided in this section, will be followed. Funds are also reserved for these amendments. HIGHWAY PROGRAMS funded by MAP-21 (Moving Ahead for Progress in the 21st Century Act) National Highway Performance Program (NHPP) Under MAP-21, the enhanced National Highway System is composed of rural and urban roads serving major population centers, intermodal transportation facilities and major travel destinations. It includes the Interstate System, all principle arterials, highways that provide motor vehicle access between the NHS and major intermodal transportation facilities, and the network of highways important to U.S. strategic defense (STRAHNET) and its connectors to major military installations. Moving forward it is anticipated as new principle arterials are identified, there will be a separate process/review to determine if they are NHS eligible. 16 Surface Transportation Program (STP) STP funds may be used the State and localities for projects to preserve or improve conditions and performance on any Federal-aid highway, bridge projects on any public road, facilities for nonmotorized transportation, transit capital projects and public bus terminals and facilities. The distribution of STP funds includes 50 percent for use in urban and rural areas of the state based on population. The remaining 50 percent can be used in any area of the state at the direction of the Department. Highway Safety Improvement Program (HSIP) - The Highway Safety Improvement Program is a program to achieve a significant reduction in traffic fatalities and serious injuries on all public roads. Safety projects include Hazard Elimination, Railroad Crossing, and Railroad Protective Devices. Congestion Mitigation/Air Quality (CMAQ) - These funds are for projects, which can be proven to reduce traffic congestion and/or improve air quality in non-attainment or maintenance areas. Projects such as intersection improvements, signal coordination, and ride sharing qualify for these funds. Currently, there are twenty eight counties in non-attainment or maintenance areas: Barrow, Bartow, Bibb, Carroll, Catoosa, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Floyd, Forsyth, Fulton, Gwinnett, Hall, Heard, Henry, Monroe, Murray, Newton, Paulding, Putnam, Rockdale, Spalding, Walker and Walton. Transportation Alternatives Program (TAP) Established with MAP-21, this new program encompasses projects that were previously eligible activities under separately funded programs. Qualifying projects include transportation enhancement activities, recreational trails, safe routes to school, and planning, designing or constructing roadways within the right-of-way of former Interstate routes or other divided highways. Demonstration or High Priority (Demo, HPP) These funds are congressionally authorized and designated for specified projects. HIGHWAY FUNDING SOURCES State Funding Sources - The $1.29 billion in State highway funds are available from several sources including motor fuel taxes, special fuel taxes (diesel), State Bonds and 3% state sales tax on gasoline. Eighty-two percent of these funds are used for construction and maintenance of state highways. Another eight percent are programmed for improvements to local roads. The remainder is not associated with a specific route. Revenues from these sources increase about one percent a year. State funds are part of the STIP program development, with about $1.11 billion used for federal match. Federal Highway Funding Sources Federal highway funds in the STIP are estimated based on the Department's expectations of what Congress will authorize to be spent on the program. The Department expects to get at least $4.89 billion in federal highway funds over the next four years, from the Highway Trust and Other Funds and $1.24 billion from carryover funding from SAFETEALU and previous highway laws. Estimates are subject to change based on forthcoming yearly appropriation and obligation levels set by Congress. 17 Advance Construction (AC) Federal law allows states to borrow against future federal funding. Available state dollars are used to fund these projects until payments are made. These projects are then partially or completely converted to regular federal funds and the Federal Highway Administration billed for the federal portion of these payments. There are four projects in the STIP (PI # 0006367, 0006368, 0006369, 0009717) establishing amounts for conversion for debt service of GARVEE bond projects that were funded federal AC. Local Highway Funding Sources - During the four-year program, an estimated $1.21 billion in local funds will be needed to match federal-aid for local highway projects and for local contributions to matching improvements on the state highway system. Unobligated Balances Refers to Federal funding from prior years that have not had their Apportionments completely exhausted. These funds are still available to be used as part of the current year's Obligation Authority as well as the new Apportionments for the first year of this document. 18 Description Summary of Highway Available Funds and Projects ($ Millions) FY 2015 FY 2016 FY 2017 FY 2018 Total funds available $1,849 $1,827 $2,354 $1,645 Total highway projects $1,834 $1,807 $2,329 $1,589 Reserve - modifications & amendments Reserve for AC conversions $15 $20 $25 $56 $0 $0 $0 $0 Total $7,675 $7,559 $116 $0 Total Estimated Highway Funds and Available Spending Authority ($ Millions) Category Groupings FY 2015 FY 2016 FY 2017 FY 2018 Total Apportionment National Highway Performance Surface Transportation Highway Safety Improvement Congestion Mitigation Transportation Alternatives Total Apportionment Unobligated Balance Grand Total $697 $330 $79 $65 $33 $1,204 $1,237 $2,441 $704 $334 $80 $66 $34 $1,218 $1,218 $710 $337 $81 $67 $34 $1,229 $1,229 $717 $340 $82 $67 $34 $1,240 $1,240 $2,828 $1,341 $322 $265 $135 $4,891 $1,237 $6,128 Available Federal Spending Authority Formula Obligation Ceiling Special Limitation High Priority/Earmarks Special Limitation Appalachian Highway Forest Highway/Nat'l Parks Other Federal Funds Total Federal Funding Availability AC with State funds State funds (including state bond) Local funds Grand Total $1,222 $31 $13 $0 $20 $1,286 $0 $420 $143 $1,849 $1,234 $38 $36 $0 $3 $1,311 $0 $289 $227 $1,827 $1,246 $41 $17 $0 $1 $1,305 $0 $294 $755 $2,354 $1,258 $6 $13 $0 $1 $1,278 $0 $287 $80 $1,645 $4,960 $116 $79 $0 $25 $5,180 $0 $1,290 $1,205 $7,675 19 FY 15 FY 18 Funding of Highway Projects: The $7.56 billion highway program for FY 20152018 includes $5.06 billion in federal-aid, $1.29 billion in state funds and $1.21 billion in local funds. The following table summarizes program funding for FY 2015-2018: Fund Source Federal Aid State Funds Local Funds Total Bond Funds (included in State and/or Local) FY 2015-2018 Highway Projects ($ Millions) FY 2015 FY 2016 FY 2017 FY 2018 Total Average FY 2015-2018 Annual $1,271 $420 $143 $1,834 $158 $1,291 $289 $227 $1,807 $0 $1,280 $294 $755 $2,329 $4 $1,222 $287 $80 $1,589 $0 $5,064 $1,290 $1,205 $7,559 $162 $1,266 $323 $301 $1,890 $41 Program Distribution (Federal Aid $) * NHPP $68 $35 $171 $178 $452 $113 STP ($100) ($112) ($224) ($252) ($688) ($172) Safety $3 ($2) $3 ($1) $3 $1 CMAQ ($36) $31 $30 $45 $70 $18 Transportation Alt. $27 $32 $32 $32 $123 $31 IM $0 ($1) ($1) $0 ($2) ($1) NHS $0 ($18) ($40) $0 ($58) ($15) * The negative balances represent the over programming of a particular fund source, but the overall program maintains financial constraint. Funding from other categories may be transferred to cover the additional projects. FY 2015-2018 Summary of Highway Projects by MPO Area * 2015 2016 2017 2018 Albany $45,000 $227,070 $8,768,896 $1,324,412 Athens $35,063,924 $0 $56,308 $0 Atlanta TMA $638,330,590 $629,097,909 $1,199,494,547 $538,761,601 Augusta TMA $22,092,335 $12,131,329 $8,968,926 $30,000 Brunswick $0 $0 $5,208,292 $0 Chattanooga TMA $12,123,266 $28,814,957 $1,001,500 $0 Columbus TMA $24,247,001 $467,450 $3,080,919 $0 Dalton $2,158,842 $15,584,920 $0 $0 Gainesville $25,639,046 $67,878,244 $48,582,384 $21,888,042 Hinesville $2,774,075 $11,457,769 $0 $2,644,000 Macon $52,252,697 $14,461,282 $52,283,194 $2,381,671 Rome $26,214,251 $12,651,323 $57,172,054 $0 Savannah TMA $34,558,384 $33,423,085 $11,060,759 $95,648,673 Valdosta $0 $56,454,174 $31,863,305 $0 Warner Robins $0 $173,747 $5,016,014 $0 MPO Total $875,499,411 $882,823,259 $1,432,557,098 $662,678,399 Rural Area State Total $959,055,896 $923,634,650 $896,569,051 $926,671,576 $1,834,555,307 $1,806,457,909 $2,329,126,149 $1,589,349,975 * excludes Transit projects Total $10,365,378 $35,120,232 $3,005,684,647 $43,222,590 $5,208,292 $41,939,723 $27,795,370 $17,743,762 $163,987,716 $16,875,844 $121,378,844 $96,037,628 $174,690,901 $88,317,479 $5,189,761 $3,853,558,167 $3,705,931,173 $7,559,489,340 20 Moving Ahead for Progress in the 21st Century Act Title 3 programs Transit, passenger rail, aviation, freight rail and ports join highways as significant modes in Georgia's intermodal transportation system. Non-highway modes funded through Title 3 or through moneys flexed from Title 1 are part of the STIP. Because of its importance to the state's transportation program, a comprehensive summary of non-highway modal programs, funded with other than MAP-21 funding and administered by the Georgia Department of Transportation is included in this document. TRANSIT PROGRAMS The Georgia Department of Transportation (GDOT) in cooperation with the Federal Transit Administration (FTA) and the state's public transit agencies work together to develop service programs and facility improvements to meet the state's public transportation needs. One of the missions of GDOT's public transit program is to preserve and enhance the state's facilities and equipment in urban and rural public transit. Public transit projects listed in the STIP are funded with Federal Transit Administration funds (under SAFETEA-LU and MAP-21). These projects have been identified by the MPOs through the transportation planning process and become a part of the Transportation Improvement Programs (TIP) in urban areas. The Department in cooperation with rural transit operators identifies rural needs. Urban transit projects are listed for cities with transit programs in operation - Albany, Athens, Atlanta, Augusta, Columbus, Gainesville, Hinesville, Macon, Rome and Savannah. Typical urban transit projects include urban capital, planning, and operating (Section 5307) and statewide elderly/disabled capital (Section 5310) projects. GDOT is the designated recipient of FTA funds for areas under 200,000 population. The Department receives financing from the State's General Fund budget to match up to one-half of the local share of transit capital projects in Albany, Athens, Gainesville, Hinesville, Macon and Rome. In addition, the Department coordinates with the Georgia Department of Human Services (GDHS) on transportation projects for the elderly and disabled population. Atlanta, Augusta, Savannah and Columbus have populations of over 200,000 and receive transit federal funds directly from FTA. The Department also provides up to one-half the local share of matching funds for capital projects in these areas. Within the constraints of the state budget, the Department provides financial assistance to match projects for Cobb Community Transit (CCT), the Gwinnett County Transit, the Metropolitan Atlanta Rapid Transit Authority (MARTA) and Douglas County. Transit Programs include: Urbanized Area Formula Program FTA Section 5307 provides funding for capital, operating and planning assistance. Funds are distributed nationwide on a formula basis. Fixed Guideway Capital Investment Grants (In lieu of current Bus Discretionary Program, a new formuala Bus and Bus Facilities Program (5339) is established in MAP21) FTA Section 5309 provides capital funds for modernization of existing rail systems (Modified from the New Starts/Small Starts program) 21 Enhanced Mobility of Seniors and Individuals with Disabilities Program FTA Section 5310 supports the capital costs of transportation services for older adults and people with disabilities. Formula Grants for Rural Areas Program FTA Section 5311 provides funding to enhance the access of people in non-urbanized areas to healthcare, shopping, education, employment, public services and recreation. Funds are available for capital, operating and administrative expenses. This program also includes the Rural Transit Assistance Program for State DOTs (Section 5311(b)(3) which provides funding for training, technical assistance projects, research and other support services for rural transit operations. The Section 5311 Program also includes a 15% set-aside for capital support for the private intercity bus operators (Section 5311(f)). Job Access and Reverse Commute Program (Repealed and consolidated within FTA Section 5307 and 5311 programs). FTA Section 5316 funds remaining under SAFETEALU provides formula funding to States and Designated Recipients to support the transport of welfare recipients and low income recipients to and from jobs and activities related to their employment including reverse commute projects. New Freedom Program (Repealed and consolidated within FTA Section 5310 program). 5317 funds remaining under SAFETEA-LU provides funding to support public transportation services beyond those required by the Americans with Disabilities Act of 1990 (ADA) to assist individuals with disabilities with accessing transportation services, including transportation to and from jobs and employment support services. Transit Asset Management FTA Section 5326 provides new requirements for transit asset management by FTA's grantees as well as new reporting requirements to promote accountability. State Safety Oversight FTA Section 5329 provides authority to establish and enforce a new comprehensive framework to oversee the safety of public transportation throughout the United States as it pertains to heavy rail, light rail, buses, ferries, and streetcars. State of Good Repair Grants FTA Section 5337 is dedicated to repairing and upgrading the nation's rail transit systems along with high-intensity motor bus systems that use highoccupancy vehicle lanes, including bus rapid transit (BRT). Bus and Bus Facilities FTA Section 5339 provides capital funding to replace, rehabilitate and purchase buses and related equipment and to construct bus-related facilities. ***The funds authorized and appropriated for repealed SAFETEA-LU programs are available for obligation (and expenditure) through their authorized period of availability, unless and until Congress takes action directing otherwise. Programs falling under this category include the Clean Fuels Grant Program, Job Access and Reverse Commute, New Freedom, Transit in the Parks, Alternatives Analysis, Bus and Bus Facilities, Fixed Guideway Modernization, and Over-the-Road Bus Program. These programs expired on September 30, 2012 and no new funding is authorized beyond fiscal year 2012. 22 TRANSIT FUNDING SOURCES State Funding Sources The State Legislature provides up to one-half of the required twenty percent match for federal transit funding through the General Fund. Approximately $6 million in General Funds for transit purposes are programmed in the STIP. Federal Transit Funding Sources The $796 million in federal funds is partially based on estimates of federal revenue available to Georgia through the Transit Trust Fund and from earmarked funds in SAFETEA-LU. Local Transit Funding Sources During the four-year program, an estimated $260 million in local funds will be needed to match federal funds. These funds are acquired through local sales taxes, special taxing districts, property taxes as well as the general tax digest. New Safety Authority (5329) Summary of Transit Programs as a result the MAP-21 (Moving Ahead for Progress in the 21st Century) MAP-21 Program Changes Repealed Clean Fuels Grants (5308) Consolidated Urbanized Areas Formula Grants (5307) [JARC] Modified Fixed Guideway Capital Investment Grants (5309) State of Good Repair Gant (5337) Asset Management (5326) Job Access and Reverse Commute (5316) [JARC] New Freedom Program (5317) Enhanced Mobility of Seniors and Individuals with Disabilities (5310) [New Freedom] Rural Area Formula Grants (5311) [JARC] Metropolitan and Statewide Planning (5303 &5304) Research Development, Demonstration, and Deployment (5312) Bus and Bus Facilities (5339) Paul S. Sarbanes Transit in the Parks (5320) Public Transportation Emergency Relief (5324) TOD Planning Pilot Grants (20005(b) of MAP-21) Alternatives Analysis (5339) Over-the-Road Bus (Sec. 3039 - TEA-21) Technical Assistance and Standards (5314) Human Resources and Training (5322) 23 Fund Source Federal Funds State Funds Local Funds Total FY 2015-2018 Transit Projects ($ Thousands) FY 2015 $177,984 $1,943 $54,838 $234,765 FY 2016 $195,703 $1,142 $64,786 $261,631 FY 2017 $233,272 $1,356 $69,897 $304,525 FY 2018 $188,966 $1,200 $71,026 $261,192 Total FY 2015-2018 $795,925 $5,641 $260,547 $1,062,113 Annual Average $198,981 $1,410 $65,137 $265,528 The following new projects have been added to the STIP in FY2015: 1. $1.3M (100% Federal funded) ARRA for the acquisition of the Macon Maintenance Facility 2. $210K (Federal) for Veterans Transportation & Community Living Initiative (VTCLI); $40K Local 3. $463,947 (Federal) Ben Hill County Transit Start-up in FY2015; $28,960 State; $261,228 Local 4. $87,077 (Federal) Brantley County Transit Start-up in FY2015; $5,248 State; $50,338 Local. 5. $58,263 (Federal) Meriwether County Transit Start-up FY2015; $-0- State; $58,264 Local 6. $862,681 (Federal) GDOT Intermodal SSO Program; $215,670 State 24 Estimated Transit Funds by Program - FY 2015-2018 ($ Thousands) Category Metropolitan Planning (5303) Urbanized Area Formula Program (5307) Capital Urbanized Area Formula Program Operating (5307) Enhanced Mobility of Seniors and Individuals with Disabilities (5310) Formula Grants for Rural Areas Program (5311) Capital Formula Grants for Rural Areas Program (5311) Operating Intercity Bus Program (5311f) State Safety Oversight (5329) State of Good Repair (5337) Bus & Bus Facilities (5339) Other Transit Projects Total Apportionment FY 2015 FY 2016 $0 1$81,688 $6,289 $3,820 $0 $81,894 $15,382 $1,439 2$9,028 3$25,864 $6,555 $28,744 $2,574 4$999 $87,676 $16,532 $295 $234,765 $1,569 $999 $105,211 $19,838 $0 $261,631 FY 2017 $0 $97,055 $10,110 $2,060 $7,866 $34,493 $1,882 $999 $126,254 $23,806 $0 $304,525 FY 2018 $3,190 $5,843 $17,510 $3,890 $2,977 $52,400 $2,008 $0 $0 $0 $173,374 $261,192 Total FY 2015-2018 $3,190 $266,480 $49,291 $11,209 $26,426 $141,501 $8,033 $2,997 $319,141 $60,176 $173,669 $1,062,113 1Macon Maintenance Facility Acquisition ($1.3M) is being added in FY2015 which increases this apportionment 2Capital for the Veterans Transportation & Community Initiative and new rural county transit startups (Ben Hill, Brantley and Meriwether) increases this apportionment 3Operating funding for new rural county transit startups (Ben hill, Brantley and Meriwether) increases this apportionment 4Decrease in State Safety Oversight (SSO) funding in FY 2015 reduces this apportionment 5Apportionment increased due to the construction of the Albany Multimodal Transit Center 25 AVIATION PROGRAMS The mission of GDOT's aviation program is to preserve and enhance the State's air transportation system to meet the demands of users. The program provides financial and technical support to publicly owned, open to the public airports. The Georgia Department of Transportation is authorized to plan and support the establishment, development and maintenance of aviation and aviation facilities. The Georgia Airport Aid Program (GAAP) provides state funding assistance, appropriated by the Georgia General Assembly, for capital, maintenance, approach aid and planning projects. Development, Maintenance, Approach Aid, and Planning projects are funded at 75% state assistance or 50% state assistance for urban area airports lacking federal support. All FAA (Federal Aviation Administration) supported construction projects may be funded at 95% FAA and 2.5% state aid. Airport markings on State development projects are eligible for 100% funding. In addition, the minimum contract level of state funding assistance on all GAAP projects is $1,500. State projects (non-federal) are selected annually based on the GAAP Priority System criteria. Federally funded projects have the highest priority for matching state funds. RAIL PROGRAMS The primary mission of GDOT's rail program is to preserve and enhance the State's rail transportation system for future development and expansion of rail freight and rail passenger service. Existing rail corridors in the Department's Freight Rail Plan are identified to be either acquired and rehabilitated, or rehabilitated, in order to maintain and assure strategic rail freight access to Georgia's communities. Since 1992, GDOT has acquired 540 miles of light density railroad lines and since 1981, GDOT has rehabilitated 793 miles of light density railroad lines. The passenger rail program defined in the document titled: Intermodal Program for Rail Passenger Service in Georgia, guides implementation of intrastate, intercity, and commuter rail passenger service to provide a multi-modal alternative in the State's largest travel market. Seven (7) commute services and six (6) intercity rail lines are identified in the Program to serve and connect together the Atlanta, Athens, Griffin, Macon, Bremen, Canton, Senoia, Albany, Savannah, Augusta, and Columbus metropolitan markets. PORT PROGRAMS The mission of GDOT's ports program is to partner with the Corps of Engineers to maintain the navigability of the Atlantic Intracoastal Waterway and Georgia's deepwater ports in Savannah and Brunswick. In order to maintain a navigable channel, the Corps of Engineers dredges the Savannah and Brunswick Harbors annually. The Department's role is to partner with the Corps to provide dredge material containment areas for the Corp's work for the federal navigation projects. The Department is required to cost/share in dike design, construction, and environmental mitigation. GDOT funds 35% of dike construction costs but no maintenance costs of disposal areas. GDOT annually requests funding from the Georgia General Assembly to cover the costs of these activities. 26 Statewide Transportation Improvement Program (STIP) and Transportation Improvement Program (TIP) Amendment Process The Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) issued the Final Rule to revise the Statewide and Metropolitan Transportation Planning regulations incorporating changes from the Moving Ahead for Progress in the 21st Century Act (MAP-21) with an effective date of July 2012. The revised regulations clearly define administrative modifications and amendments as actions to update plans and programs. 23 Code of Federal Regulations (CFR) Part 450.104 defines administrative modifications and amendments as follows: Administrative modification "means a minor revision to a long-range statewide or metropolitan transportation plan, Transportation Improvement Program (TIP), or Statewide Transportation Improvement Program (STIP) that includes minor changes to project/project phase costs, minor changes to funding sources of previously-included projects, and minor changes to project/project phase initiation dates. Administrative Modification is a revision that does not require public review and comment, redemonstration of fiscal constraint, or a conformity determination (in nonattainment and maintenance areas)." Amendment "means a revision to a long-range statewide or metropolitan transportation plan, TIP, or STIP that involves a major change to a project included in a metropolitan transportation plan, TIP, or STIP, including the addition or deletion of a project or major change in project cost, project/project phase initiation dates, or a major change in design concept or design scope (e.g., changing project termini or the number of through traffic lanes). Changes to projects that are included only for illustrative purposes do not require an amendment. An amendment is a revision that requires public review and comment, redemonstration of fiscal constraint, or a conformity determination (for metropolitan transportation plans and TIPs involving "non-exempt" projects in nonattainment and maintenance areas). In the context of a long-range statewide transportation plan, an amendment is a revision approved by the State in accordance with its public involvement process." The following procedures have been developed for processing administrative modifications and amendments to the STIP and Metropolitan Planning Organizations (MPOs) TIPs and Long Range Transportation Plans (LRTPs). Processes described below detail procedures that are to be used to update an existing approved STIP or TIP and associated plan, if applicable. A key element of the amendment process is to assure that funding balances are maintained. 27 Administrative Modifications for Initial Authorizations The following actions are eligible as Administrative Modifications to the STIP/TIP/LRTP: A. Revise a project description without changing the project scope, conflicting with the environmental document or changing the conformity finding in nonattainment and maintenance areas (less than 10% change in project termini). This change would not alter the original project intent. B. Splitting or combining projects. C. Federal funding category change. D. Minor changes in expenditures for transit projects. E. Roadway project phases may have a cost increase less than $2,000,000 or 20% of the amount to be authorized. F. Shifting projects within the 4-year STIP as long as the subsequent annual draft STIP was submitted prior to September 30. G. Projects may be funded from lump sum banks as long as they are consistent with category definitions. An administrative modification can be processed in accordance with these procedures provided that: 1. It does not affect the air quality conformity determination. 2. It does not impact financial constraint. 3. It does not require public review and comment. The administrative modification process consists of a monthly list of notifications from GDOT to all involved parties, with change summaries sent on a monthly basis to the FHWA and FTA by the GDOT. The GDOT will submit quarterly reports detailing projects drawn from each lump sum bank with remaining balance to the FHWA. 28 Amendments for Initial Authorizations The following actions are eligible as Amendments to the STIP/TIP/LRTP: A. Addition or deletion of a project. B. Addition or deletion of a phase of a project. C. Roadway project phases that increase in cost over the thresholds described in the Administrative Modification section. D. Addition of an annual TIP. E. Major change to scope of work of an existing project. A major change would be any change that alters the original intent i.e. a change in the number of through lanes, a change in termini of more than 10 percent. F. Shifting projects within the 4-year STIP which require redemonstration of fiscal constraint or when the subsequent annual draft STIP was not submitted prior to September 30. (See Administrative Modification item F.) Amendments to the STIP/TIP/LRTP will be developed in accordance with the provisions of 23 CFR Part 450. This requires public review and comment and responses to all comments, either individually or in summary form. For amendments in MPO areas, the public review process should be carried out in accordance with the procedures outlined in the Participation Plan. The GDOT will assure that the amendment process and the public involvement procedures have been followed. Cost changes made to the second, third and fourth years of the STIP will be balanced during the STIP yearly update process. All amendments should be approved by FHWA and/or FTA. Notes: 1. The date a TIP becomes effective is when the Governor or his designee approves it. For nonattainment and maintenance areas, the effective date of the TIP is based on the date of U.S. Department of Transportation's positive finding of conformity. 2. The date the STIP becomes effective is when FHWA and FTA approve it. 3. The STIP is developed on the state fiscal year which is July 1-June 30. 4. Funds for cost increases will come from those set aside in the STIP financial plan by the GDOT for modifications and cost increases. Fiscal Constraint will be maintained in the STIP at all times. 29 Additional Funding Request After the Initial Authorization Additional funding requests for all phases after the receiving initial authorization for those phases shall be a modification and be reported at each month's end except under the following conditions: A. The Initial Work Authorization for the phase is older than 10 years. B. The additional funding request exceeds the Initial Work Authorization by greater than $10 million. 30 FHWA/GDOT PE and Right of Way FMIS Authorization Policy Requirements for Additional PE Submittals: These policies pertain to FMIS modifications incurred after the initial authorization. The initial authorization must be programmed in the applicable TIP/STIP to receive funding. The FHWA Georgia Division reserves the right to deny the FMIS modification request regardless of whether it meets the below requirements. Additional funding requests for PE phases after the receiving initial authorization shall be a modification and be reported at each month's end. Any requests not meeting the below expectations or appear to not be a candidate for additional funds through a FMIS modifications shall be required to have programming in the current planning document updated to reflect the request. Mitigation phases added as a FMIS modification will not be approved and must be programmed separately. If any requests fall outside of the below guidelines the request will need to be programmed in the current planning document. The Initial Work Authorization for the phase is older than 7 years. The additional funding request exceeds the Initial Work Authorization by greater than $2,000,000 or 20% of the amount of the initial authorization, whichever is greater. Requirements for all ROW Submittals: Every project presented to FHWA for right of way funding authorization must be listed in the current STIP/TIP. All FMIS requests need to be based on a current GDOT ROW cost estimate. All projects must have approved current/accurate Right of Way plans. All projects must have a current approved NEPA document. ROW Phase under $15 million Right of Way Project authorizations under $15 million must be programmed in a single year through the current STIP/TIP and be authorized fully in that same year. Split Funded Project over $15 million Right of Way projects over $15 million may be split funded in two phases that are programmed in consecutive years. Final Right of Way phase must not fall in the same fiscal year as construction. A minimum of 40% of all funding must be in the first year of authorization. If Additional Right Of Way Funds are Needed If additional Right of Funds are needed for the following situations: 1) Condemnation over runs, 2) Change in cost estimate due to change in scope or significant plan changes an amount up to 20% of original cost estimate may be authorized immediately with documentation of where the funds were obtained from in the GDOT program to follow within 30 days to the FHWA Georgia Division Office. If an amount is needed over 20% of the original ROW cost estimate, or for reasons other than stated above, FHWA and GDOT will deal with these issues on a case by case basis. Documentation of where the funds were obtained from will be forwarded to the Georgia FHWA Division office within 30 days of approval. 31 Section VII. LUMP SUM FUNDING A portion of the STIP funding is set aside for eleven groups of projects that do not affect the capacity of the roadway. The Lump Sum projects program is intended to give the Department and MPO flexibility to address projects of an immediate need while fulfilling the requirements of the STIP. Funds are set up in lump sum banks to undertake projects that are developed after the STIP is approved. These lump sums banks, located in the statewide or "All" county section of the STIP, are listed in a number of funding types for each year for the Department's convenience in managing and accounting for the funding. These Lump Sum Banks are shown in the TIP/STIP with the words "Lump Sum" in the project description and contain an amount of funding for each year. Funds are drawn from these lump sums during the year and individual projects are programmed. The individual projects may include work at one or several locations for letting and accounting purposes. Listed below are these eleven groups and information about them. Except for groups for preliminary engineering and rights of way protective buying, the total available funds are shown as construction for easy accounting but preliminary engineering and rights-of-way may be drawn from this amount when needed in that category. Individual projects are programmed and funds drawn from the Lump Sum Bank at the time these funds are needed for Preliminary Engineering, Rights of Way and Construction. These projects may be funded in the current year or one of the other TIP/STIP years. Funds for these projects are not counted until authorization is requested for the funds. At that time the actual cost is deducted from the balance in the Lump Sum Bank. To provide the readers of the TIP/STIP with as much information as possible, individual projects to be funded from the Lump Sum Bank in the future may be shown in the TIP/STIP with a program year of 2015 and a preliminary estimated cost. These projects are also denoted with the words "Uses Lump Sum Bank PI # 000xxxx" in the lower left area of the project listing. To avoid double counting, these projects are not included in the county total at the end of the county. Group: Maintenance Criteria: existing system maintenance only This group has six funding/work types: two are for bridge painting/maintenance and the other four are for roadway maintenance. Major types of work undertaken are: resurfacing, pavement rehabilitation, median work, impact attenuators, signing, fencing, pavement markings, landscaping, rest areas, walls, guardrail and shoulder work. Also included is preliminary engineering necessary to prepare plans and rights-of-way needed for work such as landslide repair, sewer hookups and erosion control. Group: Safety Criteria: work qualifying for the High Hazard Safety Program and other safety projects This group includes the following work types: signal installation/upgrades, guardrail installation, sign installation, railroad protection devices, operational improvements, railroad crossing hazard elimination, roadway hazard elimination and special safety studies and programs. 32 Group: Preliminary Engineering Criteria: planning, studies and management systems This group is a single item Group: Roadway/Interchange Lighting Criteria: lighting This group is a single item. Group: Rights of Way - Protective Buying and Hardship Acquisitions Criteria: purchase of parcel(s) of rights of way (RW) for future projects that are in jeopardy of development and for hardship acquisition. Qualifying projects are those that have preliminary engineering (PE) underway or have a PE, RW or construction phase in the STIP. For counties that are not in conformance for air quality the only qualifying projects are those that have a RW phase in the STIP. This group is a single item. Group: Transportation Enhancement Criteria: projects qualifying for the Transportation Enhancement program (TE) and the Recreational Trails & Scenic Byway programs TE projects shown in the STIP will be funded on a first come first served basis. When a project is funded it is drawn down from the lump sum. When all funds are gone, no other projects can be funded until the next fiscal year, which begins on July 1. This group has two funding types. Group: Transportation Alternatives Program (TAP) Criteria: TAP provides funding for programs and projects defined as transportation alternatives, including on- and off-road pedestrian and bicycle facilities, infrastructure projects for improving non-driver access to public transportation and enhanced mobility, community improvement activities, and environmental mitigation; recreational trail program projects; safe routes to school projects; and projects for planning, designing, or constructing boulevards and other roadways largely in the right-of-way of former Interstate System routes or other divided highways. Consistent with what is allowed in the MAP-21 legislation, GDOT reserves the right to transfer 50% of available TAP funds to one of the most flexible funding categories available. Those dollars may be spent on any federal-aid eligible project to permit GDOT to focus on delivering the long-needed transportation improvements that support the safe and efficient movement of people and goods, in the most cost-effective manner. The remaining 50% of TAP funds consists of dollars sub-allocated to MPOs over 200,000 in population as well as TAP funds held at State DOTs eligible for use in areas below 200,000 populations. Projects selected to receive these funds must be the result of a competitive selection process. This group has two funding types. 33 Group: Livable Centers Initiative (LCI) Criteria: projects qualifying for the LCI program and selected by the Atlanta Regional Commission (ARC) LCI implementation projects are selected on a competitive basis and lump sum funding amounts are programmed according to reasonable schedules for engineering, right of way acquisitions and construction for projects comprising the overall program. Funding for individual phases of a project may be shifted between fiscal years as necessary if such shifts do not affect the implementation schedule of other projects or exceed the overall lump sum funding amount. This group is a single item. Group: Safe Routes to Schools Criteria: To enable and encourage children, including those with disabilities, to walk and bicycle to school; to make walking and bicycling to school safe and more appealing; and to facilitate the planning, development and implementation of projects that will improve safety, and reduce traffic, fuel consumption, and air pollution in the vicinity of schools. This group has three items; Infrastructure & non-infrastructure & any project. Group: High Risk Rural Roads Criteria: States are required to identify these roadways (and expend the HRRR funds) according to the following definition: any roadway functionally classified as a rural major or minor collector or a rural local road and A. on which the accident rate for fatalities and incapacitating injuries exceeds the statewide average for those functional classes of roadway; or B. that will likely have increases in traffic volume that are likely to create an accident rate for fatalities and incapacitating injuries that exceeds the statewide average for those functional classes of roadway." 34 Group: Regional Traffic Signal Optimization Criteria: Applies to maintenance and operation of traffic control devices statewide. Candidate projects include: A. Regional Traffic Operations Concepts B. Micro-Regional Traffic Operations C. Traffic Control Maintenance Contracts D. Signal Timing E. Identification of minor operational improvement projects to be submitted fir Operational Projects under another Lump Sum category. Projects will: A. Have to support the Regional or Statewide Traffic Signal Concept of Operations B. Focus on operating and maintaining the components of traffic control systems C. Local or quasi-governmental agencies may be contracted with at the project level. D. on which the accident rate for fatalities and incapacitating injuries exceeds the statewide average for those functional classes of roadway; or that will likely have increases in traffic volume that are likely to create an accident rate for fatalities and incapacitating Group: Low Impact Bridges Criteria: Candidates for this process will require minimal permits, minor utility impacts, minimal FEMA coordination, no on-site detour, and meet other low-impact characteristics as identified in this document. Projects that ultimately qualify for this expedited process also must not exceed established environmental impact thresholds and thus qualify as a Categorical Exclusion (CE) determinations in compliance with the National Environmental Policy Act (NEPA). The Program has been created with three major principles in mind safety, stewardship and streamlining. The safety of the travelling public is of paramount importance. It is the intent of this program to reduce risk associated with structurally deficient, scour critical, temporarily shored, or fracture critical structures. Second only to safety, the program will foster stewardship of Georgia's environmental and financial resources. Projects developed under the Program will seek to minimize the impact to the natural environment while providing long-term cost effective engineering solutions. The Program will result in accelerated, streamlined delivery of all phases of the bridge replacement including, planning, design, environmental approval and construction. 35 The MPO Lump Sum Process The types of projects that the Department programs with lump sum funding have always adhered to the Federal Regulations set forth in 23 CFR 450.216 (9) b, which states "(for STIP) projects that are not considered to be of appropriate scale for individual identification in a given program year may be grouped by function, work type, and/or geographic area using the applicable classification under 23 CFR 771.117 (c) and (d) and/or 40 CFR part 51.". The Department's lump sum projects also follow the guidelines set forth in 23 CFR 771.117 (c) and (d). The Lump Sum program is intended to give the Department and MPO the flexibility to address projects of an immediate need while fulfilling the requirements of the STIP. Every year as the TIP development process begins, each MPO is provided with funding information for the Lump Sum "banks". The Lump Sum banks identified for the MPOs are part of a larger series of Statewide Lump Sum banks. The purpose of showing these Lump Sum banks in the TIPs is to allow for projects that are more "routine" or "minor" to be shown in the TIPs therefore allowing for the funds to be authorized without the need for administrative actions by the MPO. In an effort to allow for increased transparency in the Lump Sum Program for the MPO areas, several changes in the program will be implemented. These changes include the distribution of the Lump Sum Banks by a population-based formula, establishment of new procedures for revising the distributions levels, and timely and consistent reporting methods for identifying the projects programmed and let against the banks for each MPO. It is with the implementation of these additional efforts we believe that a higher level of transparency will be achieved and maintained. Beginning with the annual development of each MPO TIP, each MPO shall receive for each Lump Sum bank that they qualify for, the funding amounts as calculated by the most current census information available. The share will be calculated using the MPO's percentage of entire population of the state including the rural areas. Currently those distributions are as follows: MPO Albany Athens Atlanta Augusta Brunswick Chattanooga Columbus Dalton Gainesville Hinesville Macon Rome Savannah Valdosta Warner Robins MPO Total Rural Total 2010 Census 1.24% 1.57% 49.74% 3.19% 0.82% 1.03% 2.08% 1.06% 1.85% 0.73% 1.73% 0.99% 2.74% 1.14% 1.53% 71.44% 28.56% 36 In the event an MPO exhausts any one annual Lump Sum bank capacity and it becomes necessary to increase the Lump Sum bank, the MPO may move future years Lump Sum bank funding in the TIP of a like kind to the current year. Constraint will be maintained from the annual set aside of obligation authority for modifications. Reporting of the projects that are programmed from these Lump Sum banks will consist of two delivery methods. The first method will consist of two Lump Sum Reports posted on the GDOT external website. The first report will list projects and financial information by Lump Sum bank. The user may select the Lump Sum bank of interest and "real time" project information for all projects funded from that Lump Sum bank for the current fiscal year will be listed. The report shall also include the beginning balance for the Lump Sum bank and its current balance and at the end of the fiscal year, a complete report of the usage and shifts made to the Lump Sum bank will be posted on the webpage. The second report will be by MPO where a user may select the MPO of interest and a "real time" MPO Lump Sum bank usage will be generated that will show project information for all projects programmed for all Lump Sum banks for the MPO in the current fiscal year. The Department will request that each MPO setup a link from their website to these reports to provide another access point to the reports as well. The second delivery method will consist of the reviewing of the Lump Sum banks and projects authorized and let within the MPO area at the regularly scheduled Technical Coordinating Committee and Policy Committee meetings. The same versions of the reports as described earlier will be used to convey this information. With these additional changes to the Lump Sum Program, the Department will be able to provide another level of transparency and at the same time provide each MPO with the most accurate and current information possible. The Department remains committed to providing a responsive Lump Sum program with a transparent, streamlined reporting process. 37 Section VIII. 38 Debt Service for GARVEE $749,672 Intermodal/Transit $1,062,112 Other $892,317 Environmental Improvements $3,600 Bridge Rehab Added Capacity $807 $150,202 Bridge Replacement Added Capacity $ in Thousands STIP Funds by Category for 2015 - 2018 Total Funds $8.62 Billion Reconstruction No Added Capacity $44,525 Restoration, Rehab & Resurfacing $608,138 Minor Widening $86,609 Bridge Replacement No Added Capacity $532,004 Safety Improvements $56,023 Bridge Rehab No Added Capacity $614,308 Traffic Management/Engineering $283,142 $1,439,336 Major Widening $33,262 Relocation Added Capacity $351,513 Construction New Roads $1,573,808 Reconstruction Added Capacity $140,223 Construction New Bridges Project description Type of work, see Appendix A Glossary of Terms for further definitions. This is the PI or Project Identification number used throughout the life of the project for tracking purpose. Understanding STIP Entries List of the different phases involved in a particular project. Potential phases include: Scoping, Preliminary Engineering, Rights of way, Utilities, and/or Construction. Total cost of funding for each phase of work. The status of when work is scheduled to begin, or when the funds were authorized . Section IX. 39 Total amount previously authorized, i.e. funds spent on the project Total cost, authorizations plus funds not yet authorized . Preliminary parcel count anticipated for ROW phase. Identify government participation (Federal, State, or Local) in funding each phase of project. Project Details: Describes the purpose and anticipated benefits of the project. Funding Category: May be Bridge, STP, NHS, etc. & refers to specific Category of funds to be used. Section X. State of Georgia Outline Map Showing Counties Dade Catoosa WhitfieldMurray Walker Fannin Gilmer Chattooga Gordon Pickens Towns Rabun Union WhiteHabersham Lumpkin Stephens Floyd Bartow Dawson Cherokee Forsyth Hall Banks Franklin Hart Jackson Madison Elbert Polk Paulding Cobb Gwinnett Barrow Clarke Oglethorpe Haralson Carroll Heard DeKalb Oconee Walton Wilkes Lincoln Douglas Fulton Rockdale Clayton Morgan Newton Greene Taliaferro Columbia Coweta Henry Fayette Spalding Butts Jasper Putnam McDuffie Warren Hancock Glascock Richmond Meriwether Troup Pike Lamar Monroe Baldwin Jones Jefferson Washington Burke Harris Upson Talbot Bibb Wilkinson Crawford Twiggs Johnson Jenkins Screven Muscogee ChattahoocheeMarion Taylor Peach Houston Macon Bleckley Laurens Emanuel Treutlen Candler Bulloch Effingham Schley Stewart Webster Sumter Quitman Randolph Terrell Lee Dooly Crisp Pulaski Wilcox Dodge Montgomery Wheeler Toombs Evans Tattnall Telfair Turner Ben Hill Jeff Davis Appling Long Bryan Liberty Chatham Clay Calhoun Dougherty Worth Irwin Tift Coffee Early Baker Miller Mitchell Colquitt Berrien Atkinson Cook Lanier Seminole Decatur Grady Thomas Brooks Lowndes Clinch Echols Bacon Wayne Pierce Ware Brantley Charlton McIntosh Glynn Camden 40 Section XI. Index of Counties County Appling Atkinson Bacon Baker Baldwin Banks Barrow Bartow Ben Hill Berrien Bibb Bleckley Brantley Brooks Bryan Bulloch Burke Butts Calhoun Camden Candler Carroll Catoosa Charlton Chatham Chattahoochee Chattooga Cherokee Clarke Clay Clayton Clinch Cobb Coffee Colquitt Columbia Cook Coweta Crawford Crisp Dade Dawson Decatur DeKalb Page 105 107 109 110 112 115 118 120 126 128 In an MPO area 130 132 134 136 140 144 146 148 150 153 154 In an MPO area 158 In an MPO area In an MPO area 160 In an MPO area In an MPO area 162 In an MPO area 163 In an MPO area 164 168 172 173 In an MPO area 174 175 177 179 181 In an MPO area County Dodge Dooly Dougherty Douglas Early Echols Effingham Elbert Emanuel Evans Fannin Fayette Floyd Forsyth Franklin Fulton Gilmer Glascock Glynn Gordon Grady Greene Gwinnett Habersham Hall Hancock Haralson Harris Hart Heard Henry Houston Irwin Jackson Jasper Jeff Davis Jefferson Jenkins Johnson Jones Lamar Page 184 186 In an MPO area In an MPO area 189 191 192 195 197 200 201 In an MPO area In an MPO area In an MPO area 203 In an MPO area 205 207 In an MPO area 208 210 212 In an MPO area 214 In an MPO area 217 219 221 224 225 In an MPO area In an MPO area 226 228 232 235 237 241 242 243 244 41 County Lanier Laurens Lee Liberty Lincoln Long Lowndes Lumpkin Macon Madison Marion McDuffie McIntosh Meriwether Miller Mitchell Monroe Montgomery Morgan Murray Muscogee Newton Oconee Oglethorpe Paulding Peach Pickens Pierce Pike Polk Pulaski Putnam Quitman Rabun Randolph Richmond Rockdale Schley Screven Seminole Spalding Stephens Stewart Sumter Talbot Page 245 247 250 In an MPO area 251 253 In an MPO area 254 257 260 261 263 266 267 269 270 272 275 276 279 In an MPO area 281 285 286 In an MPO area 287 289 292 294 296 297 299 302 303 305 In an MPO area In an MPO area 307 308 309 310 312 314 316 319 County Taliaferro Tattnall Taylor Telfair Terrell Thomas Tift Toombs Towns Treutlen Troup Turner Twiggs Union Upson Walker Walton Ware Warren Washington Wayne Webster Wheeler White Whitfield Wilcox Wilkes Wilkinson Worth Page 321 322 323 325 327 329 331 333 336 338 340 345 348 349 350 352 353 356 360 362 364 N/A 365 366 In an MPO area 368 369 371 372 42 STATE TRANSPORTATION IMPROVEMENT PROGRAM All Counties Project: 0000694 Type Work: Miscellaneous Improvements Descp:OPERATE STATE AGENCY WIDE COMMERCIAL VEHICLE PERMIT SYSTEM Length: 0.00 Phase CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Fund STP Year 2015 Federal $400,000 State $100,000 Other $0 Total $500,000 Project: 0005821 Type Work: Signing Descp:SBR 15 CENTRAL RTE SBR 60 SBR70 NORTH CRESCENT BICYCLE SIGNS Length: 0.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 477,742 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $43,431 $434,311 State $0 $0 Other $0 $0 Total $43,431 $434,311 Project: 0006123 Type Work: Miscellaneous Improvements Descp:LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2015 Length: 0.00 Phase ALL Total Project Cost: Total Project Authorizations: Total Parcels: $ 19,000,000 $0 0 Fund STP Year 2015 Federal $15,200,000 State $0 Other $3,800,000 Total $19,000,000 Project: 0006130 Type Work: Intersection Improvement Descp:LUMP SUM ROADWAY SAFETY FUNDS - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 70,000,000 $0 0 Phase ALL Fund HSIP Year 2015 Federal $63,000,000 State $7,000,000 Other $0 Total $70,000,000 Project: 0006137 Type Work: Bridges Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,000,000 $0 0 Phase ALL Fund STP Year 2015 Federal $5,600,000 State $1,400,000 Other $0 Total $7,000,000 43 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0006165 Type Work: Lighting Descp:LUMP SUM INTERCHANGE/ROADWAY LIGHTING 2015 Length: 0.00 Phase ALL Fund NHPP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Year 2015 Federal $800,000 State $200,000 Other $0 Total $1,000,000 Project: 0006167 Type Work: Lighting Descp:LUMP SUM INTERCHANGE/ROADWAY LIGHTING 2016 Length: 0.00 Phase ALL Fund NHPP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Year 2016 Federal $800,000 State $200,000 Other $0 Total $1,000,000 Project: 0006172 Type Work: Bridges Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,000,000 $0 0 Phase ALL Fund NHPP Year 2015 Federal $10,800,000 State $1,200,000 Other $0 Total $12,000,000 Project: 0006179 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA - 2015 Phase ALL Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 73,648,608 $0 0 Fund STP Year 2015 Federal State $58,918,886 $14,729,722 Other $0 Total $73,648,608 Project: 0006186 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,500,000 $0 0 Phase ALL Fund STP Year 2015 Federal $10,000,000 State $2,500,000 Other $0 Total $12,500,000 44 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0006193 Type Work: Resurface & Maintenance Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 43,000,000 $0 0 Phase ALL Fund NHPP Year 2015 Federal $34,400,000 State $8,600,000 Other $0 Total $43,000,000 Project: 0006200 Type Work: Railroad Crossing Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,400,000 $0 0 Phase ALL Fund HSIP Year 2015 Federal $4,400,000 State $0 Other $0 Total $4,400,000 Project: 0006207 Type Work: Rights-Of-Way Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Phase ALL Fund STP Year 2015 Federal $800,000 State $200,000 Other $0 Total $1,000,000 Project: 0006214 Type Work: Railroad Crossing Descp:LUMP SUM RRX PROTECTION DEVICE - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,800,000 $0 0 Phase ALL Fund HSIP Year 2015 Federal $3,800,000 State $0 Other $0 Total $3,800,000 Project: 0006221 Type Work: Signals Descp:LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,000,000 $0 0 Phase ALL Fund STP Year 2015 Federal $12,000,000 State $3,000,000 Other $0 Total $15,000,000 45 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0006228 Type Work: Special Studies Descp:LUMP SUM TRAF&REVENUE/DESIGN-BUILD/SPECIAL Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Phase ALL Fund STP Year 2015 Federal $400,000 State $100,000 Other $0 Total $500,000 Project: 0006235 Type Work: Water Pollution Mitig. Descp:LUMP SUM WETLAND MITIGATION SITE PURCHASE/RESTORATION - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,200,000 $0 0 Phase ALL Fund STP Year 2015 Federal $960,000 State $240,000 Other $0 Total $1,200,000 Project: 0006294 Type Work: Pedestrian Crossings Descp:PEDESTRIAN IMPROVEMENTS @ 10 SR LOCATIONS IN DISTRICT 6 Length: 0.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 530,573 $ 97,000 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $87,300 $390,215 State $9,700 $43,357 Other $0 $0 Total $97,000 $433,573 Project: 0006299 Type Work: TE-Landscape/Beautify Descp:WILDFLOWER PROGRAM OVERHEAD ACCOUNT - PE ONLY Length: 0.00 Phase PE Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 918,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $734,400 State $183,600 Other $0 Total $918,000 Project: 0006367 Type Work: Miscellaneous Improvements Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2015 Length: 0.00 Phase CST Fund NHPP Total Project Cost: Total Project Authorizations: Total Parcels: $ 188,141,960 $0 0 Year Federal State 2015 $150,513,568 $37,628,392 Other Total $0 $188,141,960 46 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0006368 Type Work: Miscellaneous Improvements Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2016 Length: 0.00 Phase CST Fund NHPP Total Project Cost: Total Project Authorizations: Total Parcels: $ 188,141,960 $0 0 Year Federal State 2016 $150,513,568 $37,628,392 Other Total $0 $188,141,960 Project: 0006369 Type Work: Miscellaneous Improvements Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2017 Length: 0.00 Phase CST Fund NHPP Total Project Cost: Total Project Authorizations: Total Parcels: $ 188,141,960 $0 0 Year Federal State 2017 $150,513,568 $37,628,392 Other Total $0 $188,141,960 Project: 0006461 Type Work: Pedestrian Crossings Descp:PEDESTRIAN UPGRADES @ 12 SR INTERSECTIONS IN DISTRICT 6 Length: 0.00 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 394,381 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $354,942 State $39,438 Other $0 Total $394,381 Project: 0006947 Type Work: Vegetation Removal Descp:ENHANCED RECOVERY AREA - VEGETATION REMOVAL IN DISTRICT 6 Length: 0.00 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 537,792 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $484,012 State $53,779 Other $0 Total $537,792 Project: 0007498 Type Work: Operational Improvement Descp:LUMP SUM OPERATIONS FOR ANY AREA - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 13,450,000 $0 0 Phase ALL Fund STP Year 2015 Federal $10,760,000 State $2,690,000 Other $0 Total $13,450,000 47 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0007505 Type Work: Bicycle/Ped. Facility Descp:LUMP SUM RECREATIONAL TRAILS - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,250,000 $0 0 Phase ALL Fund TAP Year 2015 Federal $1,000,000 State $250,000 Other $0 Total $1,250,000 Project: 0007507 Type Work: Bicycle/Ped. Facility Descp:LUMP SUM RECREATIONAL TRAILS - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,250,000 $0 0 Phase ALL Fund TAP Year 2016 Federal $1,000,000 State $250,000 Other $0 Total $1,250,000 Project: 0007552 Type Work: Special Studies Descp:SOUTHEASTERN ECONOMIC ALLIANCE HIGH SPEED RAIL DEVELOPMENT Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,249,750 $0 0 Phase PE Fund HPP Year 2015 Federal $1,799,800 State $449,950 Other $0 Total $2,249,750 Project: 0007700 Type Work: ITS Descp:ITS OPERATIONS AND SUPPORT STATEWIDE 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,500,000 $0 0 Phase CST Fund NHPP Year 2016 Federal $6,000,000 State $1,500,000 Other $0 Total $7,500,000 Project: 0007701 Type Work: ITS Descp:ITS OPERATIONS AND SUPPORT STATEWIDE 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,500,000 $0 0 Phase CST Fund NHPP Year 2017 Federal $6,000,000 State $1,500,000 Other $0 Total $7,500,000 48 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0007702 Type Work: ITS Descp:ITS OPERATIONS AND SUPPORT STATEWIDE 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,500,000 $0 0 Phase CST Fund NHPP Year 2018 Federal $6,000,000 State $1,500,000 Other $0 Total $7,500,000 Project: 0008326 Type Work: Miscellaneous Improvements Descp:LUMP SUM SAFE ROUTES TO SCHOOL INFRASTRUCTURE - 2015 Length: 0.00 Phase ALL Fund Safety Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,345,222 $0 0 Year 2015 Federal $1,345,222 State $0 Other $0 Total $1,345,222 Project: 0008333 Type Work: Miscellaneous Improvements Descp:LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - 2015 Length: 0.00 Phase ALL Fund Safety Total Project Cost: Total Project Authorizations: Total Parcels: $ 810,000 $0 0 Year 2015 Federal $810,000 State $0 Other $0 Total $810,000 Project: 0008334 Type Work: Miscellaneous Improvements Descp:LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - 2016 Length: 0.00 Phase ALL Fund Safety Total Project Cost: Total Project Authorizations: Total Parcels: $ 810,270 $0 0 Year 2016 Federal $810,270 State $0 Other $0 Total $810,270 Project: 0008639 Type Work: Intersection Improvement Descp:LUMP SUM HIGH RISK RURAL ROADS - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,200,000 $0 0 Phase ALL Fund Safety Year 2016 Federal $2,880,000 State $320,000 Other $0 Total $3,200,000 49 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009224 Type Work: Miscellaneous Improvements Descp:LUMP SUM SAFE ROUTES TO SCHOOL ANY PROJECTS - 2015 Length: 0.00 Phase ALL Fund Safety Total Project Cost: Total Project Authorizations: Total Parcels: $ 546,170 $0 0 Year 2015 Federal $546,170 State $0 Other $0 Total $546,170 Project: 0009555 Type Work: Preliminary Engineering Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 350,000 $0 0 Phase PE Fund STP Year 2015 Federal $280,000 State $70,000 Other $0 Total $350,000 Project: 0009574 Type Work: Preliminary Engineering Descp:STATEWIDE BRIDGE INSPECTION - FY 2016 - PE ONLY Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,500,000 $0 0 Phase PE Fund STP Year 2016 Federal $6,800,000 State $1,700,000 Other $0 Total $8,500,000 Project: 0009575 Type Work: Preliminary Engineering Descp:STATEWIDE BRIDGE INSPECTION - FY 2017 - PE ONLY Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,500,000 $0 0 Phase PE Fund STP Year 2017 Federal $6,800,000 State $1,700,000 Other $0 Total $8,500,000 Project: 0009577 Type Work: Preliminary Engineering Descp:ENVIRONMENTAL ANALYSIS ON FED-AID PROJ BY CONSULTANT-FY 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,500,000 $0 0 Phase Fund PE NHPPX Year 2015 Federal $2,000,000 State $500,000 Other $0 Total $2,500,000 50 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009578 Type Work: Preliminary Engineering Descp:ENVIRONMENTAL ANALYSIS ON FED-AID PROJ BY CONSULTANT-FY 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,500,000 $0 0 Phase Fund PE NHPPX Year 2017 Federal $2,000,000 State $500,000 Other $0 Total $2,500,000 Project: 0009581 Type Work: Miscellaneous Improvements Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - 2015 Length: 0.00 Phase CST CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 28,785,000 $ 11,000,000 0 Fund STP STP Year 2015 2015 Federal $14,228,000 $8,800,000 State $3,557,000 $2,200,000 Other $0 $0 Total $17,785,000 $11,000,000 Project: 0009582 Type Work: Miscellaneous Improvements Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - 2016 Length: 0.00 Phase CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 29,072,000 $0 0 Fund STP Year 2016 Federal $23,257,600 State $5,814,400 Other $0 Total $29,072,000 Project: 0009583 Type Work: Miscellaneous Improvements Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - 2017 Length: 0.00 Phase CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 29,657,215 $0 0 Fund STP Year 2017 Federal $23,725,772 State $5,931,443 Other $0 Total $29,657,215 Project: 0009587 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2015 - PE ONLY Phase PE Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Fund STP Year 2015 Federal $1,000,000 State $0 Other $0 Total $1,000,000 51 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009588 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2016 - PE ONLY Phase PE Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Fund STP Year 2016 Federal $1,000,000 State $0 Other $0 Total $1,000,000 Project: 0009589 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2017 - PE ONLY Phase PE Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Fund STP Year 2017 Federal $1,000,000 State $0 Other $0 Total $1,000,000 Project: 0009590 Type Work: Miscellaneous Improvements Descp:STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2015 Length: 0.00 Phase PE Fund CMAQ Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,200,000 $0 0 Year 2015 Federal $960,000 State $240,000 Other $0 Total $1,200,000 Project: 0009591 Type Work: Miscellaneous Improvements Descp:STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2016 Length: 0.00 Phase PE Fund CMAQ Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,200,000 $0 0 Year 2016 Federal $960,000 State $240,000 Other $0 Total $1,200,000 Project: 0009592 Type Work: Miscellaneous Improvements Descp:STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2017 Length: 0.00 Phase PE Fund CMAQ Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,200,000 $0 0 Year 2017 Federal $960,000 State $240,000 Other $0 Total $1,200,000 52 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009594 Type Work: Miscellaneous Improvements Descp:STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2015 Length: 0.00 Phase PE PE Fund CMAQ CMAQ Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,000,000 $0 0 Year 2015 2015 Federal $4,944,000 $820,000 State $1,236,000 $0 Other $0 $0 Total $6,180,000 $820,000 Project: 0009595 Type Work: Miscellaneous Improvements Descp:STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2016 Length: 0.00 Phase PE PE Fund CMAQ CMAQ Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,000,000 $0 0 Year 2016 2016 Federal $4,944,000 $820,000 State $1,236,000 $0 Other $0 $0 Total $6,180,000 $820,000 Project: 0009596 Type Work: Miscellaneous Improvements Descp:STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2017 Length: 0.00 Phase PE PE Fund CMAQ CMAQ Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,000,000 $0 0 Year 2017 2017 Federal $4,944,000 $820,000 State $1,236,000 $0 Other $0 $0 Total $6,180,000 $820,000 Project: 0009717 Type Work: Miscellaneous Improvements Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2018 Length: 0.00 Phase CST Fund NHPP Total Project Cost: Total Project Authorizations: Total Parcels: $ 185,246,410 $0 0 Year Federal State 2018 $148,197,128 $37,049,282 Other Total $0 $185,246,410 Project: 0009738 Type Work: Miscellaneous Improvements Descp:LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2016 Length: 0.00 Phase ALL Total Project Cost: Total Project Authorizations: Total Parcels: $ 19,000,000 $0 0 Fund STP Year 2016 Federal $15,200,000 State $0 Other $3,800,000 Total $19,000,000 53 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009739 Type Work: Miscellaneous Improvements Descp:LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2017 Length: 0.00 Phase ALL Total Project Cost: Total Project Authorizations: Total Parcels: $ 19,000,000 $0 0 Fund STP Year 2017 Federal $15,200,000 State $0 Other $3,800,000 Total $19,000,000 Project: 0009740 Type Work: Miscellaneous Improvements Descp:LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2018 Length: 0.00 Phase ALL Total Project Cost: Total Project Authorizations: Total Parcels: $ 19,000,000 $0 0 Fund STP Year 2018 Federal $15,200,000 State $0 Other $3,800,000 Total $19,000,000 Project: 0009742 Type Work: Intersection Improvement Descp:LUMP SUM ROADWAY SAFETY FUNDS - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 74,850,000 $0 0 Phase ALL Fund HSIP Year 2016 Federal $67,365,000 State $7,485,000 Other $0 Total $74,850,000 Project: 0009743 Type Work: Intersection Improvement Descp:LUMP SUM ROADWAY SAFETY FUNDS - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 75,000,000 $0 0 Phase ALL Fund HSIP Year 2017 Federal $67,500,000 State $7,500,000 Other $0 Total $75,000,000 Project: 0009744 Type Work: Intersection Improvement Descp:LUMP SUM ROADWAY SAFETY FUNDS - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 80,000,000 $0 0 Phase ALL Fund HSIP Year 2018 Federal $72,000,000 State $8,000,000 Other $0 Total $80,000,000 54 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009746 Type Work: Bridges Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,000,000 $0 0 Phase ALL Fund STP Year 2016 Federal $4,800,000 State $1,200,000 Other $0 Total $6,000,000 Project: 0009747 Type Work: Bridges Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,000,000 $0 0 Phase ALL Fund STP Year 2017 Federal $5,600,000 State $1,400,000 Other $0 Total $7,000,000 Project: 0009748 Type Work: Bridges Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,000,000 $0 0 Phase ALL Fund STP Year 2018 Federal $5,600,000 State $1,400,000 Other $0 Total $7,000,000 Project: 0009755 Type Work: Lighting Descp:LUMP SUM INTERCHANGE/ROADWAY LIGHTING 2018 Length: 0.00 Phase ALL Fund NHPP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Year 2018 Federal $800,000 State $200,000 Other $0 Total $1,000,000 Project: 0009758 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA - 2016 Phase ALL Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 64,739,730 $0 0 Fund STP Year 2016 Federal State $51,791,784 $12,947,946 Other $0 Total $64,739,730 55 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009759 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA - 2017 Phase ALL Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 56,300,000 $0 0 Fund STP Year 2017 Federal State $45,040,000 $11,260,000 Other $0 Total $56,300,000 Project: 0009760 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA - 2018 Phase ALL Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 62,100,000 $0 0 Fund STP Year 2018 Federal State $49,680,000 $12,420,000 Other $0 Total $62,100,000 Project: 0009762 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,000,000 $0 0 Phase ALL Fund STP Year 2016 Federal $12,000,000 State $3,000,000 Other $0 Total $15,000,000 Project: 0009763 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,000,000 $0 0 Phase ALL Fund STP Year 2017 Federal $12,000,000 State $3,000,000 Other $0 Total $15,000,000 Project: 0009764 Type Work: Pavement Rehab Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,000,000 $0 0 Phase ALL Fund STP Year 2018 Federal $12,000,000 State $3,000,000 Other $0 Total $15,000,000 56 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009766 Type Work: Resurface & Maintenance Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 34,000,000 $0 0 Phase ALL Fund NHPP Year 2016 Federal $27,200,000 State $6,800,000 Other $0 Total $34,000,000 Project: 0009767 Type Work: Resurface & Maintenance Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 32,000,000 $0 0 Phase ALL Fund NHPP Year 2017 Federal $25,600,000 State $6,400,000 Other $0 Total $32,000,000 Project: 0009768 Type Work: Resurface & Maintenance Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 31,300,000 $0 0 Phase ALL Fund NHPP Year 2018 Federal $25,040,000 State $6,260,000 Other $0 Total $31,300,000 Project: 0009770 Type Work: Railroad Crossing Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,400,000 $0 0 Phase ALL Fund HSIP Year 2016 Federal $4,400,000 State $0 Other $0 Total $4,400,000 Project: 0009771 Type Work: Railroad Crossing Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,400,000 $0 0 Phase ALL Fund HSIP Year 2017 Federal $4,400,000 State $0 Other $0 Total $4,400,000 57 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009772 Type Work: Railroad Crossing Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,400,000 $0 0 Phase ALL Fund HSIP Year 2018 Federal $4,400,000 State $0 Other $0 Total $4,400,000 Project: 0009774 Type Work: Rights-Of-Way Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Phase ALL Fund STP Year 2016 Federal $400,000 State $100,000 Other $0 Total $500,000 Project: 0009775 Type Work: Rights-Of-Way Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Phase ALL Fund STP Year 2017 Federal $800,000 State $200,000 Other $0 Total $1,000,000 Project: 0009776 Type Work: Rights-Of-Way Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Phase ALL Fund STP Year 2018 Federal $800,000 State $200,000 Other $0 Total $1,000,000 Project: 0009778 Type Work: Railroad Crossing Descp:LUMP SUM RRX PROTECTION DEVICE - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,800,000 $0 0 Phase ALL Fund HSIP Year 2016 Federal $3,800,000 State $0 Other $0 Total $3,800,000 58 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009779 Type Work: Railroad Crossing Descp:LUMP SUM RRX PROTECTION DEVICE - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,800,000 $0 0 Phase ALL Fund HSIP Year 2017 Federal $3,800,000 State $0 Other $0 Total $3,800,000 Project: 0009780 Type Work: Railroad Crossing Descp:LUMP SUM RRX PROTECTION DEVICE - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,800,000 $0 0 Phase ALL Fund HSIP Year 2018 Federal $3,800,000 State $0 Other $0 Total $3,800,000 Project: 0009782 Type Work: Signals Descp:LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,000,000 $0 0 Phase ALL Fund STP Year 2016 Federal $12,000,000 State $3,000,000 Other $0 Total $15,000,000 Project: 0009783 Type Work: Signals Descp:LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 13,000,000 $0 0 Phase ALL Fund STP Year 2017 Federal $10,400,000 State $2,600,000 Other $0 Total $13,000,000 Project: 0009784 Type Work: Signals Descp:LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 13,000,000 $0 0 Phase ALL Fund STP Year 2018 Federal $10,400,000 State $2,600,000 Other $0 Total $13,000,000 59 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009786 Type Work: Special Studies Descp:LUMP SUM TRAF&REVENUE/DESIGN-BUILD/SPECIAL Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 750,000 $0 0 Phase ALL Fund STP Year 2016 Federal $600,000 State $150,000 Other $0 Total $750,000 Project: 0009787 Type Work: Special Studies Descp:LUMP SUM TRAF&REVENUE/DESIGN-BUILD/SPECIAL Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Phase ALL Fund STP Year 2017 Federal $400,000 State $100,000 Other $0 Total $500,000 Project: 0009790 Type Work: Operational Improvement Descp:LUMP SUM OPERATIONS FOR ANY AREA - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 13,000,000 $0 0 Phase ALL Fund STP Year 2016 Federal $10,400,000 State $2,600,000 Other $0 Total $13,000,000 Project: 0009791 Type Work: Operational Improvement Descp:LUMP SUM OPERATIONS FOR ANY AREA - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,000,000 $0 0 Phase ALL Fund STP Year 2017 Federal $9,600,000 State $2,400,000 Other $0 Total $12,000,000 Project: 0009792 Type Work: Operational Improvement Descp:LUMP SUM OPERATIONS FOR ANY AREA - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,000,000 $0 0 Phase ALL Fund STP Year 2018 Federal $9,600,000 State $2,400,000 Other $0 Total $12,000,000 60 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009794 Type Work: Bicycle/Ped. Facility Descp:LUMP SUM RECREATIONAL TRAILS - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,250,000 $0 0 Phase ALL Fund TAP Year 2017 Federal $1,000,000 State $250,000 Other $0 Total $1,250,000 Project: 0009795 Type Work: Bicycle/Ped. Facility Descp:LUMP SUM RECREATIONAL TRAILS - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,250,000 $0 0 Phase ALL Fund TAP Year 2018 Federal $1,000,000 State $250,000 Other $0 Total $1,250,000 Project: 0009993 Type Work: Sharp Curve Treatments Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 1 Length: 0.00 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 424,483 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $382,035 State $42,448 Other $0 Project: 0009994 Type Work: Sharp Curve Treatments Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 2 Length: 0.00 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 424,483 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $382,035 State $42,448 Other $0 Project: 0009995 Type Work: Sharp Curve Treatments Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 3 Length: 0.00 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 424,483 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $382,035 State $42,448 Other $0 Total $424,483 Total $424,483 Total $424,483 61 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009996 Type Work: Sharp Curve Treatments Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 4 Length: 0.00 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 424,483 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $382,035 State $42,448 Other $0 Project: 0009998 Type Work: Sharp Curve Treatments Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 6 Length: 0.00 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 424,483 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $382,035 State $42,448 Other $0 Project: 0010151 Type Work: Preliminary Engineering Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2015 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 350,000 $0 0 Fund STP Year 2015 Federal $280,000 State $70,000 Other $0 Total $424,483 Total $424,483 Total $350,000 Project: 0010152 Type Work: Preliminary Engineering Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2016 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 350,000 $0 0 Fund STP Year 2016 Federal $280,000 State $70,000 Other $0 Total $350,000 Project: 0010153 Type Work: Preliminary Engineering Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2017 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 350,000 $0 0 Fund STP Year 2017 Federal $280,000 State $70,000 Other $0 Total $350,000 62 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0010154 Type Work: Preliminary Engineering Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2018 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 350,000 $0 0 Fund STP Year 2018 Federal $280,000 State $70,000 Other $0 Total $350,000 Project: 0010169 Type Work: Preliminary Engineering Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS FY 2015 Length: 0.00 Phase PE Fund Enhance Total Project Cost: Total Project Authorizations: Total Parcels: $ 40,000 $0 0 Year 2015 Federal $32,000 State $8,000 Other $0 Total $40,000 Project: 0010170 Type Work: Preliminary Engineering Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS FY 2016 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 100,000 $0 0 Fund STP Year 2016 Federal $80,000 State $20,000 Other $0 Total $100,000 Project: 0010171 Type Work: Preliminary Engineering Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS FY 2017 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 100,000 $0 0 Fund STP Year 2017 Federal $80,000 State $20,000 Other $0 Total $100,000 Project: 0010172 Type Work: Preliminary Engineering Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS FY 2018 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 100,000 $0 0 Fund STP Year 2018 Federal $80,000 State $20,000 Other $0 Total $100,000 63 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0010300 Type Work: Bridges Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 10,000,000 $0 0 Phase ALL Fund NHPP Year 2016 Federal $9,000,000 State $1,000,000 Other $0 Total $10,000,000 Project: 0010301 Type Work: Bridges Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,000,000 $0 0 Phase ALL Fund NHPP Year 2017 Federal $10,800,000 State $1,200,000 Other $0 Total $12,000,000 Project: 0010302 Type Work: Bridges Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,000,000 $0 0 Phase ALL Fund NHPP Year 2018 Federal $10,800,000 State $1,200,000 Other $0 Total $12,000,000 Project: 0010312 Type Work: Preliminary Engineering Descp:SR 400 - HERO EXPANSION Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 660,000 $0 0 Phase PE PE PE PE PE PE Fund State State State State State State Year 2014 2015 2016 2017 2018 After 2018 Federal $0 $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 $0 Other $110,000 $110,000 $110,000 $110,000 $110,000 $110,000 Total $110,000 $110,000 $110,000 $110,000 $110,000 $110,000 Project: 0010491 Type Work: Signals Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2015 Length: 0.00 Phase CST Fund STP Year LUMP Federal $3,200,000 State $800,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,000,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Other $0 Total $4,000,000 64 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0010566 Type Work: Preliminary Engineering Descp:STATEWIDE SIGNAL TIMING & DESIGN - 2015 Length: 0.00 Phase PE Fund STP Year LUMP Federal $800,000 State $200,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Other $0 Total $1,000,000 Project: 0010833 Type Work: Preliminary Engineering Descp:ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,200,000 $0 0 Phase PE Fund STP Year 2015 Federal $960,000 State $240,000 Other $0 Total $1,200,000 Project: 0010834 Type Work: Preliminary Engineering Descp:ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,200,000 $0 0 Phase PE Fund STP Year 2016 Federal $960,000 State $240,000 Other $0 Total $1,200,000 Project: 0010908 Type Work: Preliminary Engineering Descp:MS4 PERMIT COMPLIANCE - FY 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,884,715 $ 2,884,715 0 Phase PE Fund STP Year 2015 Federal $2,307,772 State $576,943 Other $0 Total $2,884,715 Project: 0010909 Type Work: Preliminary Engineering Descp:MS4 PERMIT COMPLIANCE - FY 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,048,900 $0 0 Phase PE Fund STP Year 2016 Federal $4,039,120 State $1,009,780 Other $0 Total $5,048,900 65 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0010919 Type Work: Preliminary Engineering Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 350,000 $0 0 Phase PE Fund STP Year 2016 Federal $280,000 State $70,000 Other $0 Total $350,000 Project: 0010920 Type Work: Preliminary Engineering Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 350,000 $0 0 Phase PE Fund STP Year 2017 Federal $280,000 State $70,000 Other $0 Total $350,000 Project: 0011652 Type Work: Signing Descp:STATE HIGHWAY-RAIL CROSSING SIGNING & MARKING ENG SERVICES Length: 0.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,600,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $100,000 $1,500,000 State $0 $0 Other $0 $0 Total $100,000 $1,500,000 Project: 0012684 Type Work: Weigh Scales Descp:WEIGH-IN-MOTION SCALES - FY 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,000,000 $0 0 Phase PE CST Fund NHPP NHPP Year 2015 2015 Federal $450,000 $4,050,000 State $50,000 $450,000 Other $0 $0 Total $500,000 $4,500,000 Project: 0012685 Type Work: Weigh Scales Descp:WEIGH-IN-MOTION SCALES - FY 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,500,000 $0 0 Phase PE CST Fund NHPP NHPP Year 2016 2016 Federal $450,000 $4,500,000 State $50,000 $500,000 Other $0 $0 Total $500,000 $5,000,000 66 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012686 Type Work: Weigh Scales Descp:WEIGH-IN-MOTION SCALES - FY 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,000,000 $0 0 Phase PE CST Fund NHPP NHPP Year 2017 2017 Federal $450,000 $4,050,000 State $50,000 $450,000 Other $0 $0 Total $500,000 $4,500,000 Project: 0012687 Type Work: Weigh Scales Descp:WEIGH-IN-MOTION SCALES - FY 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,000,000 $0 0 Phase PE CST Fund NHPP NHPP Year 2018 2018 Federal $450,000 $4,050,000 State $50,000 $450,000 Other $0 $0 Total $500,000 $4,500,000 Project: 0012713 Type Work: Preliminary Engineering Descp:DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2014 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,000 $0 0 Phase Fund Year PE Other Funds 2015 Federal $300,000 State $0 Other $0 Total $300,000 Project: 0012714 Type Work: Preliminary Engineering Descp:DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,000 $0 0 Phase Fund Year PE Other Funds 2016 Federal $300,000 State $0 Other $0 Total $300,000 Project: 0012715 Type Work: Preliminary Engineering Descp:DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,000 $0 0 Phase Fund Year PE Other Funds 2017 Federal $300,000 State $0 Other $0 Total $300,000 67 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012716 Type Work: Preliminary Engineering Descp:DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,000 $0 0 Phase Fund Year PE Other Funds 2018 Federal $300,000 State $0 Other $0 Total $300,000 Project: 0012718 Type Work: Preliminary Engineering Descp:ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2014 Length: 0.00 Phase Fund PE Other Funds Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 200,000 $0 0 Federal $200,000 State $0 Other $0 Total $200,000 Project: 0012719 Type Work: Preliminary Engineering Descp:ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2015 Length: 0.00 Phase Fund PE Other Funds Year 2016 Total Project Cost: Total Project Authorizations: Total Parcels: $ 200,000 $0 0 Federal $200,000 State $0 Other $0 Total $200,000 Project: 0012720 Type Work: Preliminary Engineering Descp:ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2016 Length: 0.00 Phase Fund PE Other Funds Year 2017 Total Project Cost: Total Project Authorizations: Total Parcels: $ 200,000 $0 0 Federal $200,000 State $0 Other $0 Total $200,000 Project: 0012721 Type Work: Preliminary Engineering Descp:ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2017 Length: 0.00 Phase Fund PE Other Funds Year 2018 Total Project Cost: Total Project Authorizations: Total Parcels: $ 200,000 $0 0 Federal $200,000 State $0 Other $0 Total $200,000 68 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012761 Type Work: Preliminary Engineering Descp:LOW IMPACT BRIDGE OVERSIGHT - FY 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 600,000 $0 0 Phase PE Fund STP Year 2015 Federal $480,000 State $120,000 Other $0 Total $600,000 Project: 0012762 Type Work: Preliminary Engineering Descp:LOW IMPACT BRIDGE OVERSIGHT - FY 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 600,000 $0 0 Phase PE Fund STP Year 2016 Federal $480,000 State $120,000 Other $0 Total $600,000 Project: 0012763 Type Work: Preliminary Engineering Descp:LOW IMPACT BRIDGE OVERSIGHT - FY 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 600,000 $0 0 Phase PE Fund STP Year 2017 Federal $480,000 State $120,000 Other $0 Total $600,000 Project: 0012765 Type Work: Bridge Rehab Descp:LUMP SUM LOW IMPACT BRIDGES - 2015 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,000,000 $0 0 Phase ALL Fund STP Year 2015 Federal $4,000,000 State $1,000,000 Other $0 Total $5,000,000 Project: 0012766 Type Work: Bridge Rehab Descp:LUMP SUM LOW IMPACT BRIDGES - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,500,000 $0 0 Phase ALL Fund STP Year 2016 Federal $2,800,000 State $700,000 Other $0 Total $3,500,000 69 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012767 Type Work: Bridge Rehab Descp:LUMP SUM LOW IMPACT BRIDGES - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,000,000 $0 0 Phase ALL Fund STP Year 2017 Federal $4,000,000 State $1,000,000 Other $0 Total $5,000,000 Project: 0012770 Type Work: Miscellaneous Improvements Descp:SAFE ROUTES TO SCHOOLS RESOURCE CENTER - PHASE VII Length: 0.00 Phase PE Fund Safety Year LUMP Federal $160,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 160,000 $0 0 Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE FOR FY 2015 - FY 2018 State $0 Other $0 Project: 0012771 Type Work: Miscellaneous Improvements Descp:SAFE ROUTES TO SCHOOLS RESOURCE CENTER - PHASE VIII Length: 0.00 Phase PE Fund Safety Year LUMP Federal $160,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 160,000 $0 0 Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE FOR FY 2015 - FY 2018 State $0 Other $0 Project: 0012807 Type Work: Preliminary Engineering Descp:GEORGIA HISTORIC BRIDGE MGT PLANS & SURVEY (GHBS) - FY 2015 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,000 $0 0 Phase PE Fund STP Year 2015 Federal $240,000 State $60,000 Other $0 Total $160,000 Total $160,000 Total $300,000 Project: 0012810 Type Work: Preliminary Engineering Descp:AASHTO COMMITTEES & SPONSORED EVENTS FY 2015 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 115,000 $0 0 Fund STP Year 2015 Federal $115,000 State $0 Other $0 Total $115,000 70 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012811 Type Work: Preliminary Engineering Descp:AASHTO COMMITTEES & SPONSORED EVENTS FY 2016 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 115,000 $0 0 Fund STP Year 2016 Federal $115,000 State $0 Other $0 Total $115,000 Project: 0012812 Type Work: Preliminary Engineering Descp:AASHTO COMMITTEES & SPONSORED EVENTS FY 2017 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 115,000 $0 0 Fund STP Year 2017 Federal $115,000 State $0 Other $0 Total $115,000 Project: 0012852 Type Work: Preliminary Engineering Descp:SPECIAL DRAINAGE STUDIES - FY 2015 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Phase PE Fund STP Year 2015 Federal $400,000 State $100,000 Other $0 Total $500,000 Project: 0012853 Type Work: Preliminary Engineering Descp:SPECIAL DRAINAGE STUDIES - FY 2016 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Phase PE Fund STP Year 2016 Federal $400,000 State $100,000 Other $0 Total $500,000 Project: 0012945 Type Work: Preliminary Engineering Descp:STATEWIDE BRIDGE INSPECTION - FY 2018 - PE ONLY Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,500,000 $0 0 Phase PE Fund STP Year 2018 Federal $6,800,000 State $1,700,000 Other $0 Total $8,500,000 71 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012950 Type Work: Preliminary Engineering Descp:ENVIRONMENTAL ANALYSIS ON FED-AID PROJ BY CONSULTANT-FY 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,500,000 $0 0 Phase Fund PE NHPPX Year 2018 Federal $2,000,000 State $500,000 Other $0 Total $2,500,000 Project: 0012955 Type Work: Miscellaneous Improvements Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED - 2018 Length: 0.00 Phase CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 30,000,000 $0 0 Fund STP Year 2018 Federal $24,000,000 State $6,000,000 Other $0 Total $30,000,000 Project: 0012960 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2018 - PE ONLY Phase PE Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Fund STP Year 2018 Federal $1,000,000 State $0 Other $0 Total $1,000,000 Project: 0012964 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2022 - PE ONLY Phase PE Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Fund STP Year 2017 Federal $1,000,000 State $0 Other $0 Total $1,000,000 Project: 0012965 Type Work: Preliminary Engineering Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 350,000 $0 0 Phase PE Fund STP Year 2018 Federal $280,000 State $70,000 Other $0 Total $350,000 72 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012970 Type Work: Preliminary Engineering Descp:LOW IMPACT BRIDGE OVERSIGHT - FY 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 600,000 $0 0 Phase PE Fund STP Year 2018 Federal $480,000 State $120,000 Other $0 Total $600,000 Project: 0012975 Type Work: Preliminary Engineering Descp:AASHTO COMMITTEES & SPONSORED EVENTS FY 2018 Length: 0.00 Phase PE Total Project Cost: Total Project Authorizations: Total Parcels: $ 115,000 $0 0 Fund STP Year 2018 Federal $115,000 State $0 Other $0 Total $115,000 Project: 0012982 Type Work: Preliminary Engineering Descp:ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,500,000 $0 0 Phase PE Fund STP Year 2017 Federal $1,200,000 State $300,000 Other $0 Total $1,500,000 Project: 0012983 Type Work: Preliminary Engineering Descp:ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,500,000 $0 0 Phase PE Fund STP Year 2018 Federal $1,200,000 State $300,000 Other $0 Total $1,500,000 Project: 0012988 Type Work: Preliminary Engineering Descp:MS4 PERMIT COMPLIANCE - FY 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,048,900 $0 0 Phase PE Fund STP Year 2017 Federal $4,039,120 State $1,009,780 Other $0 Total $5,048,900 73 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012989 Type Work: Preliminary Engineering Descp:MS4 PERMIT COMPLIANCE - FY 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,048,900 $0 0 Phase PE Fund STP Year 2018 Federal $4,039,120 State $1,009,780 Other $0 Total $5,048,900 Project: 0012994 Type Work: Preliminary Engineering Descp:SPECIAL DRAINAGE STUDIES - FY 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Phase PE Fund STP Year 2017 Federal $400,000 State $100,000 Other $0 Total $500,000 Project: 0012995 Type Work: Preliminary Engineering Descp:SPECIAL DRAINAGE STUDIES - FY 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Phase PE Fund STP Year 2018 Federal $400,000 State $100,000 Other $0 Total $500,000 Project: 0013057 Type Work: Preliminary Engineering Descp:ENVIRONMENTAL ANALYSIS ON FED-AID PROJ BY CONSULTANT-FY 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,500,000 $0 0 Phase Fund PE NHPPX Year 2016 Federal $2,000,000 State $500,000 Other $0 Total $2,500,000 Project: 0013059 Type Work: Preliminary Engineering Descp:PE FOR PROJ REVIEW/COST ESTIMATING CONSULTANT SERVICES-2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,000,000 $0 0 Phase PE Fund STP Year 2017 Federal $1,600,000 State $400,000 Other $0 Total $2,000,000 74 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013070 Type Work: Preliminary Engineering Descp:LIGHTING DESIGN SERVICES - FY 2015 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 150,000 $0 0 Phase PE Fund STP Year 2015 Federal $120,000 State $30,000 Other $0 Total $150,000 Project: 0013071 Type Work: Preliminary Engineering Descp:LIGHTING DESIGN SERVICES - FY 2016 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 150,000 $0 0 Phase PE Fund STP Year 2016 Federal $120,000 State $30,000 Other $0 Total $150,000 Project: 0013072 Type Work: Preliminary Engineering Descp:LIGHTING DESIGN SERVICES - FY 2017 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 150,000 $0 0 Phase PE Fund STP Year 2017 Federal $120,000 State $30,000 Other $0 Total $150,000 Project: 0013073 Type Work: Preliminary Engineering Descp:LIGHTING DESIGN SERVICES - FY 2018 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 150,000 $0 0 Phase PE Fund STP Year 2018 Federal $120,000 State $30,000 Other $0 Total $150,000 Project: 0013080 Type Work: Signals Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2016 Lanes: Exist. Prop. Length: 0.00 Phase CST Fund STP Year LUMP Federal $3,200,000 State $800,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,000,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Other $0 Total $4,000,000 75 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013081 Type Work: Signals Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2017 Length: 0.00 Phase CST Fund STP Year LUMP Federal $3,200,000 State $800,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,000,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Other $0 Total $4,000,000 Project: 0013082 Type Work: Signals Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2018 Lanes: Exist. Prop. Length: 0.00 Phase CST Fund STP Year LUMP Federal $3,200,000 State $800,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,000,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Other $0 Total $4,000,000 Project: 0013083 Type Work: Signals Descp:STATEWIDE SIGNAL TIMING & DESIGN - FY 2016 Lanes: Exist. Prop. Length: 0.00 Phase PE Fund STP Year LUMP Federal $800,000 State $200,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Other $0 Total $1,000,000 Project: 0013084 Type Work: Signals Descp:STATEWIDE SIGNAL TIMING & DESIGN - FY 2017 Lanes: Exist. Prop. Length: 0.00 Phase PE Fund STP Year LUMP Federal $800,000 State $200,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Other $0 Total $1,000,000 Project: 0013085 Type Work: Signals Descp:STATEWIDE SIGNAL TIMING & DESIGN - FY 2018 Lanes: Exist. Prop. Length: 0.00 Phase PE Fund STP Year LUMP Federal $800,000 State $200,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Other $0 Total $1,000,000 76 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013087 Type Work: Preliminary Engineering Descp:SAFETY MEDIA ACTIVITIES Lanes: Exist. Prop. Length: 0.00 Phase PE Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 100,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $90,000 State $10,000 Other $0 Total $100,000 Project: 0013105 Type Work: Miscellaneous Improvements Descp:STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2018 Length: 0.00 Phase PE PE Fund CMAQ CMAQ Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,000,000 $0 0 Year 2018 2018 Federal $4,944,000 $820,000 State $1,236,000 $0 Other $0 $0 Total $6,180,000 $820,000 Project: 0013152 Type Work: Special Studies Descp:ROUNDABOUT FEASIBLITY STUDIES - PHASE I Lanes: Exist. Prop. Length: 0.00 Phase PE Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 629,970 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $566,973 State $62,997 Other $0 Total $629,970 Project: 0013168 Type Work: Preliminary Engineering Descp:TE PROJECT MANAGEMENT - FY 2015 Lanes: Exist. Prop. Length: 0.00 Phase PE Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,000,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $1,600,000 State $400,000 Other $0 Total $2,000,000 Project: 0013171 Type Work: Pedestrian Crossings Descp:PEDESTRIAN UPGRADES @ 35 LOCS IN DISTRICT 1 Lanes: Exist. Prop. Length: 0.00 Phase PE ROW CST Fund HSIP HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,375,000 $ 1,050,000 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year 2014 LUMP LUMP Federal $945,000 $472,500 $1,620,000 State $105,000 $52,500 $180,000 Other $0 $0 $0 Total $1,050,000 $525,000 $1,800,000 77 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013172 Type Work: Pedestrian Crossings Descp:PEDESTRIAN UPGRADES @ 16 LOCS IN DISTRICT 4 Lanes: Exist. Prop. Length: 0.00 Phase PE ROW CST Fund HSIP HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,410,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP LUMP Federal $270,000 $216,000 $783,000 State $30,000 $24,000 $87,000 Other $0 $0 $0 Total $300,000 $240,000 $870,000 Project: 0013173 Type Work: Pedestrian Crossings Descp:PEDESTRIAN UPGRADES @ 59 LOCS IN DISTRICT 6 Lanes: Exist. Prop. Length: 0.00 Phase PE ROW CST Fund HSIP HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,605,000 $ 1,770,000 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year 2014 LUMP LUMP Federal $1,593,000 $796,500 $2,655,000 State $177,000 $88,500 $295,000 Other $0 $0 $0 Total $1,770,000 $885,000 $2,950,000 Project: 0013181 Type Work: Preliminary Engineering Descp:GDOT IT ENTERPRISE SUPPORT - FY 2016 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 14,390,600 $0 0 Phase PE Fund STP Year 2016 Federal $11,512,480 State $2,878,120 Other $0 Total $14,390,600 Project: 0013182 Type Work: Preliminary Engineering Descp:GDOT IT ENTERPRISE SUPPORT - FY 2017 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 14,052,500 $0 0 Phase PE Fund STP Year 2017 Federal $11,242,000 State $2,810,500 Other $0 Total $14,052,500 Project: 0013183 Type Work: Preliminary Engineering Descp:GDOT IT ENTERPRISE SUPPORT - FY 2018 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 13,922,000 $0 0 Phase PE Fund STP Year 2018 Federal $11,137,600 State $2,784,400 Other $0 Total $13,922,000 78 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013188 Type Work: Bridge Rehab Descp:LUMP SUM LOW IMPACT BRIDGES - 2018 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,000,000 $0 0 Phase ALL Fund STP Year 2018 Federal $4,000,000 State $1,000,000 Other $0 Total $5,000,000 Project: 0013190 Type Work: Miscellaneous Improvements Descp:TOWING & RECOVERY INCENTIVE PROGRAM FY 2018 Length: 0.00 Phase CST Fund CMAQ Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Year 2018 Federal $400,000 State $100,000 Other $0 Total $500,000 Project: 0013227 Type Work: ITS Descp:ITS CAMERAS & ROAD WEATHER INFORMATION SYSTEMS @ VAR LOCS Lanes: Exist. Prop. Length: 0.00 Phase PE CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,500,000 $0 0 Fund Bond Bond Year 2015 2015 Federal $0 $0 State $150,000 $5,350,000 Other $0 $0 Total $150,000 $5,350,000 Project: 0013233 Type Work: Water Pollution Mitig. Descp:LUMP SUM WETLAND MITIGATION SITE PURCHASE/RESTORATION - 2016 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,200,000 $0 0 Phase ALL Fund STP Year 2016 Federal $960,000 State $240,000 Other $0 Total $1,200,000 Project: 0013234 Type Work: Water Pollution Mitig. Descp:LUMP SUM WETLAND MITIGATION SITE PURCHASE/RESTORATION - 2017 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,200,000 $0 0 Phase ALL Fund STP Year 2017 Federal $960,000 State $240,000 Other $0 Total $1,200,000 79 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013247 Type Work: RRX Warning Device Descp:HAZARD INDEX STUDIES - FY 2015 Length: 0.00 Phase PE Fund HSIP Year LUMP Federal $300,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,000 $0 0 Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018 State $0 Other $0 Total $300,000 Project: 0013265 Type Work: Miscellaneous Improvements Descp:STATEWIDE SUE CONSULTANT SERVICES - FY 2015 Lanes: Exist. Prop. Length: 0.00 Phase UTL Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,500,000 $0 0 Fund State Year 2015 Federal $0 State $0 Other $4,500,000 Total $4,500,000 Project: 821055- Type Work: Bridges Descp:OFF SYSTEM PILE ENCASEMENT PROJECT TO REPAIR 4 BRIDGES Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 59,755 $0 0 Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Federal $47,804 State $11,951 Other $0 Project: M001854 Type Work: Bridges Descp:PILE ENCASEMENT @ 17 SR LOCATIONS IN DIST 6 Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 223,482 $0 0 Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Federal $178,786 State $44,696 Other $0 Project: M001911 Type Work: Preliminary Engineering Descp:LICENSE AND SUPPORT AGREEMENT HMMS Length: 0.00 Phase PE Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 179,264 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $143,411 State $35,853 Other $0 Total $59,755 Total $223,482 Total $179,264 80 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M003378 Type Work: Miscellaneous Improvements Descp:FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2016 Length: 0.00 Phase CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 18,000,000 $0 0 Fund STP Year 2016 Federal $14,400,000 State $3,600,000 Other $0 Total $18,000,000 Project: M003379 Type Work: Miscellaneous Improvements Descp:FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2017 Length: 0.00 Phase CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,000,000 $0 0 Fund STP Year 2017 Federal $12,000,000 State $3,000,000 Other $0 Total $15,000,000 Project: M003380 Type Work: Miscellaneous Improvements Descp:FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2018 Length: 0.00 Phase CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,000,000 $0 0 Fund STP Year 2018 Federal $12,000,000 State $3,000,000 Other $0 Total $15,000,000 Project: M003820 Type Work: Weigh Station Descp:WEIGH STATION UPGRADES @ 6 LOCATIONS PE ONLY - PHASE II Length: 0.00 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 662,448 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $596,204 State $66,245 Other $0 Total $662,448 Project: M004190 Type Work: Signing Descp:I-16 @ 17 LOCS BETWEEN CANDLER COUNTY & CHATHAM COUNTY Length: 0.00 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,250,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $3,250,000 State $0 Other $0 Total $3,250,000 81 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004191 Type Work: Signing Descp:I-20 @ 22 LOCS BETWEEN NEWTON COUNTY & RICHMOND COUNTY Length: 0.00 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,820,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $3,820,000 State $0 Other $0 Total $3,820,000 Project: M005113 Type Work: Rest Area Descp:P3 WELCOME CENTERS & REST AREAS LANDSCAPING & CUSTODIAL SW Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,550,000 $ 4,550,000 0 Phase CST Fund State Year 2015 Federal $0 State $4,550,000 Other $0 Total $4,550,000 Project: M005228 Type Work: Bridges Descp:I-20 @ 8 LOCS IN DISTRICT 1 & 2 - BRIDGE PRESERVATION Length: 0.00 Phase PE CST Fund IM NHPP Year 2014 LUMP Federal $9,000 $1,263,229 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,413,588 $ 10,000 0 Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $1,000 $140,359 Other $0 $0 Total $10,000 $1,403,588 Project: T003959 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 947,800 $0 0 Phase Fund CST Transit Year 2015 Federal $758,240 State $94,780 Other $94,780 Total $947,800 Project: T003963 Type Work: Operating Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,031,750 $0 0 Phase Fund CST Transit Year 2015 Federal $1,515,875 State $0 Other $1,515,875 Total $3,031,750 82 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T003967 Type Work: Operating Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,281,002 $0 0 Phase Fund CST Transit Year 2015 Federal $3,140,501 State $0 Other $3,140,501 Total $6,281,002 Project: T003971 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,929,500 $0 0 Phase Fund CST Transit Year 2015 Federal $2,343,600 State $292,950 Other $292,950 Total $2,929,500 Project: T003986 Type Work: Operating Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,009,210 $0 0 Phase Fund CST Transit Year 2015 Federal $1,504,600 State $0 Other $1,504,610 Total $3,009,210 Project: T003990 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,154,950 $0 0 Phase Fund CST Transit Year 2015 Federal $923,960 State $115,495 Other $115,495 Total $1,154,950 Project: T003994 Type Work: Operating Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,782,602 $0 0 Project Details: Includes T004110 Capital for Berrien Phase Fund CST Transit Year 2015 Federal $3,891,301 State $0 Other $3,891,301 Total $7,782,602 83 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T003998 Type Work: Operating Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,584,872 $0 0 Phase Fund CST Transit Year 2015 Federal $1,792,436 State $0 Other $1,792,436 Total $3,584,872 Project: T004002 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,114,800 $0 0 Project Details: Includes T004111 Capital for Berrien Project: T004006 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 734,400 $0 0 Phase Fund CST Transit Year 2015 Federal $1,691,840 State $211,480 Other $211,480 Phase Fund CST Transit Year 2015 Federal $587,520 State $73,440 Other $73,440 Total $2,114,800 Total $734,400 Project: T004016 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 527,900 $0 0 Phase Fund CST Transit Year 2015 Federal $422,320 State $52,790 Other $52,790 Total $527,900 Project: T004017 Type Work: Operating Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,174,882 $0 0 Phase Fund CST Transit Year 2015 Federal $1,087,441 State $0 Other $1,087,441 Total $2,174,882 84 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004061 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 DISCRETIONARY CAPITAL Phase CST Fund Transit Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,000 $0 0 Year 2015 Federal $240,000 State $30,000 Other $30,000 Total $300,000 Project: T004062 Type Work: Transit Projects Descp:FY 2015 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00 Phase Fund CST Transit Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,573,843 $0 0 Project Details: Funding: Federal Share 80% with a 20% local match (e.g. Greyhound) Project: T004063 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 DISCRETIONARY OPERATING Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 318,362 $0 0 Phase Fund CST Transit Year 2015 Federal $2,059,074 Federal $159,181 State $0 Other $514,769 State $0 Other $159,181 Total $2,573,843 Total $318,362 Project: T004114 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 337,600 $0 0 Project Details: Moved State Match to Other/Local Project: T004115 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 162,644 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2015 Federal $270,080 State $0 Other $67,520 Total $337,600 Phase Fund CST Transit Year 2015 Federal $130,115 State $0 Other $32,529 Total $162,644 85 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004116 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 3 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 610,659 $0 0 Project Details: Moved State Match to Other/Local Project: T004117 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 263,129 $0 0 Project Details: Moved State Match to Other/Local Project: T004118 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 183,694 $0 0 Project Details: Moved State Match to Other/Local Project: T004119 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 124,118 $0 0 Project Details: Moved State Match to Other/Local Project: T004120 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 109,224 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2015 Federal $488,527 State $0 Other $122,132 Total $610,659 Phase Fund CST Transit Year 2015 Federal $210,503 State $0 Other $52,626 Total $263,129 Phase Fund CST Transit Year 2015 Federal $146,955 State $0 Other $36,739 Total $183,694 Phase Fund CST Transit Year 2015 Federal $99,294 State $0 Other $24,824 Total $124,118 Phase Fund CST Transit Year 2015 Federal $87,379 State $0 Other $21,845 Total $109,224 86 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004121 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 178,729 $0 0 Phase Fund CST Transit Year 2015 Federal $142,983 State $35,746 Other $0 Total $178,729 Project: T004122 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 183,694 $0 0 Project Details: Moved State Match to Other/Local Project: T004123 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 89,365 $0 0 Project Details: Moved State Match to Other/Local Project: T004124 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 64,541 $0 0 Project Details: Moved State Match to Other/Local Project: T004125 Type Work: Transit Projects Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 804,282 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2015 Federal $146,955 State $0 Other $36,739 Total $183,694 Phase Fund CST Transit Year 2015 Federal $71,492 State $0 Other $17,873 Total $89,365 Phase Fund CST Transit Year 2015 Federal $51,633 State $0 Other $12,908 Total $64,541 Phase Fund CST Transit Year 2015 Federal $643,426 State $0 Other $160,856 Total $804,282 87 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004419 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 202,968 $0 0 Project Details: Moved State Match to Other/Local Project: T004420 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 121,314 $0 0 Project Details: Moved State Match to Other/Local Project: T004421 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 123,647 $0 0 Project Details: Moved State Match to Other/Local Project: T004422 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 109,650 $0 0 Project Details: Moved State Match to Other/Local Project: T004423 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 118,981 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2016 Federal $162,374 State $0 Other $40,594 Total $202,968 Phase Fund CST Transit Year 2016 Federal $97,051 State $0 Other $24,263 Total $121,314 Phase Fund CST Transit Year 2016 Federal $98,918 State $0 Other $24,729 Total $123,647 Phase Fund CST Transit Year 2016 Federal $87,720 State $0 Other $21,930 Total $109,650 Phase Fund CST Transit Year 2016 Federal $95,185 State $0 Other $23,796 Total $118,981 88 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004424 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 143,941 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2016 Project: T004426 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 86,320 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2016 Project: T004428 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 114,316 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2016 Project: T004429 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 417,602 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2016 Project: T004431 Type Work: Transit Projects Descp:FY 2016 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00 Phase Fund CST Transit Year 2016 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,567,729 $0 0 Project Details: Funding: Federal Share 80% with a 20% local match (e.g. Greyhound) Federal $115,153 Federal $69,056 Federal $91,453 Federal $334,082 Federal $1,254,183 State $0 Other $28,788 State $0 Other $17,264 State $0 Other $22,863 State $0 Other $83,520 State $0 Other $313,546 Total $143,941 Total $86,320 Total $114,316 Total $417,602 Total $1,567,729 89 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004448 Type Work: Transit Projects Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00 Total Project Cost: $0 Total Project Authorizations: $0 Total Parcels: 0 Phase Fund CST Transit Year 2016 Federal $0 State $0 Other $0 Total $0 Project: T004449 Type Work: Transit Projects Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 811,294 $0 0 Phase Fund CST Transit Year 2016 Federal $649,035 State $81,129 Other $81,129 Total $811,294 Project: T004450 Type Work: Operating Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,447,963 $0 0 Phase Fund CST Transit Year 2016 Federal $2,223,982 State $0 Other $2,223,982 Total $4,447,963 Project: T004451 Type Work: Operating Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,106,914 $0 0 Phase Fund CST Transit Year 2016 Federal $4,053,457 State $0 Other $4,053,457 Total $8,106,914 Project: T004452 Type Work: Operating Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,384,517 $0 0 Phase Fund CST Transit Year 2016 Federal $1,192,259 State $0 Other $1,192,259 Total $2,384,517 90 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004453 Type Work: Operating Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,196,357 $0 0 Phase Fund CST Transit Year 2016 Federal $1,598,179 State $0 Other $1,598,179 Total $3,196,357 Project: T004454 Type Work: Transit Projects Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 411,324 $0 0 Phase Fund CST Transit Year 2016 Federal $329,059 State $41,132 Other $41,132 Total $411,324 Project: T004455 Type Work: Transit Projects Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,768,161 $0 0 Phase Fund CST Transit Year 2016 Federal $2,214,529 State $276,816 Other $276,816 Total $2,768,161 Project: T004456 Type Work: Transit Projects Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 727,989 $0 0 Phase Fund CST Transit Year 2016 Federal $582,391 State $72,799 Other $72,799 Total $727,989 Project: T004457 Type Work: Operating Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,552,948 $0 0 Phase Fund CST Transit Year 2016 Federal $3,276,474 State $0 Other $3,276,474 Total $6,552,948 91 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004458 Type Work: Operating Descp:FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,054,733 $0 0 Phase Fund CST Transit Year 2016 Federal $2,027,366 State $0 Other $2,027,366 Total $4,054,733 Project: T004459 Type Work: Transit Projects Descp:FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,836,633 $0 0 Phase Fund CST Transit Year 2016 Federal $1,469,306 State $183,663 Other $183,663 Total $1,836,633 Project: T004810 Type Work: Transit Projects Descp:FY 2017 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00 Phase Fund CAP Transit Year 2017 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,881,275 $0 0 Project Details: Funding: Federal Share 80% with a 20% local match (e.g. Greyhound) Project: T004811 Type Work: Operating Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,865,679 $0 0 Phase Fund OPR Transit Year 2017 Federal $1,505,020 Federal $2,432,840 State $0 Other $376,255 State $0 Other $2,432,840 Total $1,881,275 Total $4,865,679 Project: T004812 Type Work: Operating Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,863,537 $0 0 Phase Fund OPR Transit Year 2017 Federal $3,931,769 State $0 Other $3,931,769 Total $7,863,537 92 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004813 Type Work: Operating Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 9,728,297 $0 0 Phase Fund OPR Transit Year 2017 Federal $4,864,148 State $0 Other $4,864,148 Total $9,728,297 Project: T004814 Type Work: Operating Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,337,556 $0 0 Phase Fund OPR Transit Year 2017 Federal $2,668,778 State $0 Other $2,668,778 Total $5,337,556 Project: T004815 Type Work: Operating Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,835,629 $0 0 Phase Fund OPR Transit Year 2017 Federal $1,917,814 State $0 Other $1,917,814 Total $3,835,629 Project: T004816 Type Work: Operating Descp:FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,861,421 $0 0 Phase Fund OPR Transit Year 2017 Federal $1,430,710 State $0 Other $1,430,710 Total $2,861,421 Project: T004817 Type Work: Transit Projects Descp:FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,203,959 $0 0 Phase Fund CAP Transit Year 2017 Federal $1,763,167 State $220,396 Other $220,396 Total $2,203,959 93 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004818 Type Work: Transit Projects Descp:FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 873,586 $0 0 Phase Fund CAP Transit Year 2017 Federal $698,869 State $87,359 Other $87,359 Total $873,586 Project: T004819 Type Work: Transit Projects Descp:FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,321,793 $0 0 Phase Fund CAP Transit Year 2017 Federal $2,657,435 State $332,179 Other $332,179 Total $3,321,793 Project: T004820 Type Work: Transit Projects Descp:FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 493,589 $0 0 Phase Fund OPR Transit Year 2017 Federal $394,871 State $49,359 Other $49,359 Total $493,589 Project: T004821 Type Work: Transit Projects Descp:FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 973,552 $0 0 Phase Fund CAP Transit Year 2017 Federal $778,842 State $97,355 Other $97,355 Total $973,552 Project: T004822 Type Work: Transit Projects Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 103,584 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CAP Transit Year 2017 Federal $82,867 State $0 Other $20,717 Total $103,584 94 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004823 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 187,881 $0 0 Project Details: Moved State Match to Other/Local Project: T004824 Type Work: Transit Projects Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 172,729 $0 0 Project Details: Moved State Match to Other/Local Project: T004825 Type Work: Transit Projects Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 142,777 $0 0 Project Details: Moved State Match to Other/Local Project: T004826 Type Work: Transit Projects Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 131,580 $0 0 Project Details: Moved State Match to Other/Local Project: T004827 Type Work: Transit Projects Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 148,376 $0 0 Phase Fund CAP Transit Year 2017 Federal $150,305 State $0 Other $37,576 Total $187,881 Phase Fund CAP Transit Year 2017 Federal $138,183 State $0 Other $34,546 Total $172,729 Phase Fund CAP Transit Year 2017 Federal $114,222 State $0 Other $28,555 Total $142,777 Phase Fund CAP Transit Year 2017 Federal $105,264 State $0 Other $26,316 Total $131,580 Phase Fund CAP Transit Year 2017 Federal $118,701 State $0 Other $29,675 Total $148,376 95 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T004828 Type Work: Transit Projects Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 145,577 $0 0 Project Details: Moved State Match to Other/Local Project: T004829 Type Work: Transit Projects Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 501,000 $0 0 Project Details: Moved State Match to Other/Local Project: T004830 Type Work: Transit Projects Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 137,179 $0 0 Project Details: Moved State Match to Other/Local Project: T004831 Type Work: Transit Projects Descp:FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 145,577 $0 0 Project Details: Moved State Match to Other/Local Project: T004832 Type Work: Transit Projects Descp:FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 243,562 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CAP Transit Year 2017 Federal $116,461 State $0 Other $29,115 Total $145,577 Phase Fund CAP Transit Year 2017 Federal $400,800 State $0 Other $100,200 Total $501,000 Phase Fund CAP Transit Year 2017 Federal $109,743 State $0 Other $27,436 Total $137,179 Phase Fund OPR Transit Year 2017 Federal $116,461 State $0 Other $29,115 Total $145,577 Phase Fund CAP Transit Year 2017 Federal $194,849 State $0 Other $48,712 Total $243,562 96 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T005114 Type Work: Operating Descp:FY 2018 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,145,092 $ 6,145,092 0 Phase Fund OPR Transit Year 2018 Federal $3,072,546 State $0 Other $3,072,546 Total $6,145,092 Project: T005115 Type Work: Operating Descp:FY 2018 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,780,238 $ 4,780,238 0 Phase Fund OPR Transit Year 2018 Federal $2,390,119 State $0 Other $2,390,119 Total $4,780,238 Project: T005117 Type Work: Transit Projects Descp:FY 2018 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 20,357,500 $0 0 Phase Fund OPR Transit Year 2018 Federal $10,178,750 State Other $0 $10,178,750 Total $20,357,500 Project: T005118 Type Work: Transit Projects Descp:FY 2018 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,177,180 $0 0 Phase Fund OPR Transit Year 2018 Federal $1,588,590 State $0 Other $1,588,590 Total $3,177,180 Project: T005119 Type Work: Transit Projects Descp:FY 2018 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 10,785,914 $0 0 Phase Fund OPR Transit Year 2018 Federal $5,392,957 State $0 Other $5,392,957 Total $10,785,914 97 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T005120 Type Work: Transit Projects Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,625 $0 0 Project: T005121 Type Work: Transit Projects Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 277,691 $0 0 Project: T005122 Type Work: Transit Projects Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 369,686 $0 0 Project: T005123 Type Work: Transit Projects Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,048,505 $0 0 Project: T005124 Type Work: Transit Projects Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 462,502 $0 0 Phase Fund CAP Transit Year 2018 Federal $240,500 State $30,063 Other $30,063 Total $300,625 Phase Fund CAP Transit Year 2018 Federal $222,153 State $27,769 Other $27,769 Total $277,691 Phase Fund CAP Transit Year 2018 Federal $295,749 State $36,969 Other $36,969 Total $369,686 Phase Fund CAP Transit Year 2018 Federal $838,804 State $104,851 Other $104,851 Total $1,048,505 Phase Fund CAP Transit Year 2018 Federal $370,002 State $46,250 Other $46,250 Total $462,502 98 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: T005125 Type Work: Transit Projects Descp:FY 2018 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 518,751 $0 0 Phase Fund CAP Transit Year 2018 Federal $415,001 State $51,875 Other $51,875 Total $518,751 99 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project PI# 0000694 0006123 0006130 0006137 0006165 0006167 0006172 0006179 0006186 0006193 0006200 0006207 0006214 0006221 0006228 0006235 0006367 0006368 0006369 0007498 0007505 0007507 0007552 0007700 0007701 0007702 0008326 0008333 0008334 0008639 0009224 0009555 0009574 0009575 0009577 0009578 0009581 0009581 0009582 0009583 0009587 0009588 0009589 0009590 0009591 0009592 0009594 0009594 0009595 0009595 Year 2015 2015 2015 2015 2015 2016 2015 2015 2015 2015 2015 2015 2015 2015 2015 2015 2015 2016 2017 2015 2015 2016 2015 2016 2017 2018 2015 2015 2016 2016 2015 2015 2016 2017 2015 2017 2015 2015 2016 2017 2015 2016 2017 2015 2016 2017 2015 2015 2016 2016 Phase CST ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL CST CST CST ALL ALL ALL PE CST CST CST ALL ALL ALL ALL ALL PE PE PE PE PE CST CST CST CST PE PE PE PE PE PE PE PE PE PE All Counties Totals Summary County Summary excludes lump sum projects. Fund STP STP HSIP STP NHPP NHPP NHPP STP STP NHPP HSIP STP HSIP STP STP STP NHPP NHPP NHPP STP TAP TAP HPP NHPP NHPP NHPP Safety Safety Safety Safety Safety STP STP STP NHPPX NHPPX STP STP STP STP STP STP STP CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ Federal $400,000 $15,200,000 $63,000,000 $5,600,000 $800,000 $800,000 $10,800,000 $58,918,886 $10,000,000 $34,400,000 $4,400,000 $800,000 $3,800,000 $12,000,000 $400,000 $960,000 $150,513,568 $150,513,568 $150,513,568 $10,760,000 $1,000,000 $1,000,000 $1,799,800 $6,000,000 $6,000,000 $6,000,000 $1,345,222 $810,000 $810,270 $2,880,000 $546,170 $280,000 $6,800,000 $6,800,000 $2,000,000 $2,000,000 $8,800,000 $14,228,000 $23,257,600 $23,725,772 $1,000,000 $1,000,000 $1,000,000 $960,000 $960,000 $960,000 $820,000 $4,944,000 $820,000 $4,944,000 State $100,000 $0 $7,000,000 $1,400,000 $200,000 $200,000 $1,200,000 $14,729,722 $2,500,000 $8,600,000 $0 $200,000 $0 $3,000,000 $100,000 $240,000 $37,628,392 $37,628,392 $37,628,392 $2,690,000 $250,000 $250,000 $449,950 $1,500,000 $1,500,000 $1,500,000 $0 $0 $0 $320,000 $0 $70,000 $1,700,000 $1,700,000 $500,000 $500,000 $2,200,000 $3,557,000 $5,814,400 $5,931,443 $0 $0 $0 $240,000 $240,000 $240,000 $0 $1,236,000 $0 $1,236,000 Other $0 $3,800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $500,000 $19,000,000 $70,000,000 $7,000,000 $1,000,000 $1,000,000 $12,000,000 $73,648,608 $12,500,000 $43,000,000 $4,400,000 $1,000,000 $3,800,000 $15,000,000 $500,000 $1,200,000 $188,141,960 $188,141,960 $188,141,960 $13,450,000 $1,250,000 $1,250,000 $2,249,750 $7,500,000 $7,500,000 $7,500,000 $1,345,222 $810,000 $810,270 $3,200,000 $546,170 $350,000 $8,500,000 $8,500,000 $2,500,000 $2,500,000 $11,000,000 $17,785,000 $29,072,000 $29,657,215 $1,000,000 $1,000,000 $1,000,000 $1,200,000 $1,200,000 $1,200,000 $820,000 $6,180,000 $820,000 $6,180,000 100 0009596 0009596 0009717 0009738 0009739 0009740 0009742 0009743 0009744 0009746 0009747 0009748 0009755 0009758 0009759 0009760 0009762 0009763 0009764 0009766 0009767 0009768 0009770 0009771 0009772 0009774 0009775 0009776 0009778 0009779 0009780 0009782 0009783 0009784 0009786 0009787 0009790 0009791 0009792 0009794 0009795 0010151 0010152 0010153 0010154 0010169 0010170 0010171 0010172 0010300 0010301 0010302 0010312 0010312 0010312 STATE TRANSPORTATION IMPROVEMENT PROGRAM 2017 PE 2017 PE 2018 CST 2016 ALL 2017 ALL 2018 ALL 2016 ALL 2017 ALL 2018 ALL 2016 ALL 2017 ALL 2018 ALL 2018 ALL 2016 ALL 2017 ALL 2018 ALL 2016 ALL 2017 ALL 2018 ALL 2016 ALL 2017 ALL 2018 ALL 2016 ALL 2017 ALL 2018 ALL 2016 ALL 2017 ALL 2018 ALL 2016 ALL 2017 ALL 2018 ALL 2016 ALL 2017 ALL 2018 ALL 2016 ALL 2017 ALL 2016 ALL 2017 ALL 2018 ALL 2017 ALL 2018 ALL 2015 PE 2016 PE 2017 PE 2018 PE 2015 PE 2016 PE 2017 PE 2018 PE 2016 ALL 2017 ALL 2018 ALL 2016 PE 2015 PE 2017 PE CMAQ CMAQ NHPP STP STP STP HSIP HSIP HSIP STP STP STP NHPP STP STP STP STP STP STP NHPP NHPP NHPP HSIP HSIP HSIP STP STP STP HSIP HSIP HSIP STP STP STP STP STP STP STP STP TAP TAP STP STP STP STP Enhance STP STP STP NHPP NHPP NHPP State State State $820,000 $4,944,000 $148,197,128 $15,200,000 $15,200,000 $15,200,000 $67,365,000 $67,500,000 $72,000,000 $4,800,000 $5,600,000 $5,600,000 $800,000 $51,791,784 $45,040,000 $49,680,000 $12,000,000 $12,000,000 $12,000,000 $27,200,000 $25,600,000 $25,040,000 $4,400,000 $4,400,000 $4,400,000 $400,000 $800,000 $800,000 $3,800,000 $3,800,000 $3,800,000 $12,000,000 $10,400,000 $10,400,000 $600,000 $400,000 $10,400,000 $9,600,000 $9,600,000 $1,000,000 $1,000,000 $280,000 $280,000 $280,000 $280,000 $32,000 $80,000 $80,000 $80,000 $9,000,000 $10,800,000 $10,800,000 $0 $0 $0 $0 $1,236,000 $37,049,282 $0 $0 $0 $7,485,000 $7,500,000 $8,000,000 $1,200,000 $1,400,000 $1,400,000 $200,000 $12,947,946 $11,260,000 $12,420,000 $3,000,000 $3,000,000 $3,000,000 $6,800,000 $6,400,000 $6,260,000 $0 $0 $0 $100,000 $200,000 $200,000 $0 $0 $0 $3,000,000 $2,600,000 $2,600,000 $150,000 $100,000 $2,600,000 $2,400,000 $2,400,000 $250,000 $250,000 $70,000 $70,000 $70,000 $70,000 $8,000 $20,000 $20,000 $20,000 $1,000,000 $1,200,000 $1,200,000 $0 $0 $0 $0 $0 $0 $3,800,000 $3,800,000 $3,800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $110,000 $110,000 $110,000 $820,000 $6,180,000 $185,246,410 $19,000,000 $19,000,000 $19,000,000 $74,850,000 $75,000,000 $80,000,000 $6,000,000 $7,000,000 $7,000,000 $1,000,000 $64,739,730 $56,300,000 $62,100,000 $15,000,000 $15,000,000 $15,000,000 $34,000,000 $32,000,000 $31,300,000 $4,400,000 $4,400,000 $4,400,000 $500,000 $1,000,000 $1,000,000 $3,800,000 $3,800,000 $3,800,000 $15,000,000 $13,000,000 $13,000,000 $750,000 $500,000 $13,000,000 $12,000,000 $12,000,000 $1,250,000 $1,250,000 $350,000 $350,000 $350,000 $350,000 $40,000 $100,000 $100,000 $100,000 $10,000,000 $12,000,000 $12,000,000 $110,000 $110,000 $110,000 101 0010312 0010833 0010834 0010908 0010909 0010919 0010920 0012684 0012684 0012685 0012685 0012686 0012686 0012687 0012687 0012713 0012714 0012715 0012716 0012718 0012719 0012720 0012721 0012761 0012762 0012763 0012765 0012766 0012767 0012807 0012810 0012811 0012812 0012852 0012853 0012945 0012950 0012955 0012960 0012964 0012965 0012970 0012975 0012982 0012983 0012988 0012989 0012994 0012995 0013057 0013059 0013070 0013071 0013072 0013073 STATE TRANSPORTATION IMPROVEMENT PROGRAM 2018 2015 2016 2015 2016 2016 2017 2015 2015 2016 2016 2017 2017 2018 2018 2015 2016 2017 2018 2015 2016 2017 2018 2015 2016 2017 2015 2016 2017 2015 2015 2016 2017 2015 2016 2018 2018 2018 2018 2017 2018 2018 2018 2017 2018 2017 2018 2017 2018 2016 2017 2015 2016 2017 2018 PE State PE STP PE STP PE STP PE STP PE STP PE STP PE NHPP CST NHPP PE NHPP CST NHPP PE NHPP CST NHPP PE NHPP CST NHPP PE Other Funds PE Other Funds PE Other Funds PE Other Funds PE Other Funds PE Other Funds PE Other Funds PE Other Funds PE STP PE STP PE STP ALL STP ALL STP ALL STP PE STP PE STP PE STP PE STP PE STP PE STP PE STP PE NHPPX CST STP PE STP PE STP PE STP PE STP PE STP PE STP PE STP PE STP PE STP PE STP PE STP PE NHPPX PE STP PE STP PE STP PE STP PE STP $0 $960,000 $960,000 $2,307,772 $4,039,120 $280,000 $280,000 $450,000 $4,050,000 $450,000 $4,500,000 $450,000 $4,050,000 $450,000 $4,050,000 $300,000 $300,000 $300,000 $300,000 $200,000 $200,000 $200,000 $200,000 $480,000 $480,000 $480,000 $4,000,000 $2,800,000 $4,000,000 $240,000 $115,000 $115,000 $115,000 $400,000 $400,000 $6,800,000 $2,000,000 $24,000,000 $1,000,000 $1,000,000 $280,000 $480,000 $115,000 $1,200,000 $1,200,000 $4,039,120 $4,039,120 $400,000 $400,000 $2,000,000 $1,600,000 $120,000 $120,000 $120,000 $120,000 $0 $240,000 $240,000 $576,943 $1,009,780 $70,000 $70,000 $50,000 $450,000 $50,000 $500,000 $50,000 $450,000 $50,000 $450,000 $0 $0 $0 $0 $0 $0 $0 $0 $120,000 $120,000 $120,000 $1,000,000 $700,000 $1,000,000 $60,000 $0 $0 $0 $100,000 $100,000 $1,700,000 $500,000 $6,000,000 $0 $0 $70,000 $120,000 $0 $300,000 $300,000 $1,009,780 $1,009,780 $100,000 $100,000 $500,000 $400,000 $30,000 $30,000 $30,000 $30,000 $110,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $110,000 $1,200,000 $1,200,000 $2,884,715 $5,048,900 $350,000 $350,000 $500,000 $4,500,000 $500,000 $5,000,000 $500,000 $4,500,000 $500,000 $4,500,000 $300,000 $300,000 $300,000 $300,000 $200,000 $200,000 $200,000 $200,000 $600,000 $600,000 $600,000 $5,000,000 $3,500,000 $5,000,000 $300,000 $115,000 $115,000 $115,000 $500,000 $500,000 $8,500,000 $2,500,000 $30,000,000 $1,000,000 $1,000,000 $350,000 $600,000 $115,000 $1,500,000 $1,500,000 $5,048,900 $5,048,900 $500,000 $500,000 $2,500,000 $2,000,000 $150,000 $150,000 $150,000 $150,000 102 0013105 0013105 0013181 0013182 0013183 0013188 0013190 0013227 0013227 0013233 0013234 0013265 M003378 M003379 M003380 M005113 T003959 T003963 T003967 T003971 T003986 T003990 T003994 T003998 T004002 T004006 T004016 T004017 T004061 T004062 T004063 T004114 T004115 T004116 T004117 T004118 T004119 T004120 T004121 T004122 T004123 T004124 T004125 T004419 T004420 T004421 T004422 T004423 T004424 T004426 T004428 T004429 T004431 T004448 T004449 STATE TRANSPORTATION IMPROVEMENT PROGRAM 2018 PE 2018 PE 2016 PE 2017 PE 2018 PE 2018 ALL 2018 CST 2015 PE 2015 CST 2016 ALL 2017 ALL 2015 UTL 2016 CST 2017 CST 2018 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2015 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST CMAQ CMAQ STP STP STP STP CMAQ Bond Bond STP STP State STP STP STP State Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit $820,000 $4,944,000 $11,512,480 $11,242,000 $11,137,600 $4,000,000 $400,000 $0 $0 $960,000 $960,000 $0 $14,400,000 $12,000,000 $12,000,000 $0 $758,240 $1,515,875 $3,140,501 $2,343,600 $1,504,600 $923,960 $3,891,301 $1,792,436 $1,691,840 $587,520 $422,320 $1,087,441 $240,000 $2,059,074 $159,181 $270,080 $130,115 $488,527 $210,503 $146,955 $99,294 $87,379 $142,983 $146,955 $71,492 $51,633 $643,426 $162,374 $97,051 $98,918 $87,720 $95,185 $115,153 $69,056 $91,453 $334,082 $1,254,183 $0 $649,035 $0 $1,236,000 $2,878,120 $2,810,500 $2,784,400 $1,000,000 $100,000 $150,000 $5,350,000 $240,000 $240,000 $0 $3,600,000 $3,000,000 $3,000,000 $4,550,000 $94,780 $0 $0 $292,950 $0 $115,495 $0 $0 $211,480 $73,440 $52,790 $0 $30,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $35,746 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $81,129 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,500,000 $0 $0 $0 $0 $94,780 $1,515,875 $3,140,501 $292,950 $1,504,610 $115,495 $3,891,301 $1,792,436 $211,480 $73,440 $52,790 $1,087,441 $30,000 $514,769 $159,181 $67,520 $32,529 $122,132 $52,626 $36,739 $24,824 $21,845 $0 $36,739 $17,873 $12,908 $160,856 $40,594 $24,263 $24,729 $21,930 $23,796 $28,788 $17,264 $22,863 $83,520 $313,546 $0 $81,129 $820,000 $6,180,000 $14,390,600 $14,052,500 $13,922,000 $5,000,000 $500,000 $150,000 $5,350,000 $1,200,000 $1,200,000 $4,500,000 $18,000,000 $15,000,000 $15,000,000 $4,550,000 $947,800 $3,031,750 $6,281,002 $2,929,500 $3,009,210 $1,154,950 $7,782,602 $3,584,872 $2,114,800 $734,400 $527,900 $2,174,882 $300,000 $2,573,843 $318,362 $337,600 $162,644 $610,659 $263,129 $183,694 $124,118 $109,224 $178,729 $183,694 $89,365 $64,541 $804,282 $202,968 $121,314 $123,647 $109,650 $118,981 $143,941 $86,320 $114,316 $417,602 $1,567,729 $0 $811,294 103 STATE TRANSPORTATION IMPROVEMENT PROGRAM T004450 T004451 T004452 T004453 T004454 T004455 T004456 T004457 T004458 T004459 T004810 T004811 T004812 T004813 T004814 T004815 T004816 T004817 T004818 T004819 T004820 T004821 T004822 T004823 T004824 T004825 T004826 T004827 T004828 T004829 T004830 T004831 T004832 T005114 T005115 T005117 T005118 T005119 T005120 T005121 T005122 T005123 T005124 T005125 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2016 CST 2017 CAP 2017 OPR 2017 OPR 2017 OPR 2017 OPR 2017 OPR 2017 OPR 2017 CAP 2017 CAP 2017 CAP 2017 OPR 2017 CAP 2017 CAP 2017 CAP 2017 CAP 2017 CAP 2017 CAP 2017 CAP 2017 CAP 2017 CAP 2017 CAP 2017 OPR 2017 CAP 2018 OPR 2018 OPR 2018 OPR 2018 OPR 2018 OPR 2018 CAP 2018 CAP 2018 CAP 2018 CAP 2018 CAP 2018 CAP Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit $2,223,982 $4,053,457 $1,192,259 $1,598,179 $329,059 $2,214,529 $582,391 $3,276,474 $2,027,366 $1,469,306 $1,505,020 $2,432,840 $3,931,769 $4,864,148 $2,668,778 $1,917,814 $1,430,710 $1,763,167 $698,869 $2,657,435 $394,871 $778,842 $82,867 $150,305 $138,183 $114,222 $105,264 $118,701 $116,461 $400,800 $109,743 $116,461 $194,849 $3,072,546 $2,390,119 $10,178,750 $1,588,590 $5,392,957 $240,500 $222,153 $295,749 $838,804 $370,002 $415,001 $0 $0 $0 $0 $41,132 $276,816 $72,799 $0 $0 $183,663 $0 $0 $0 $0 $0 $0 $0 $220,396 $87,359 $332,179 $49,359 $97,355 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $30,063 $27,769 $36,969 $104,851 $46,250 $51,875 $2,223,982 $4,053,457 $1,192,259 $1,598,179 $41,132 $276,816 $72,799 $3,276,474 $2,027,366 $183,663 $376,255 $2,432,840 $3,931,769 $4,864,148 $2,668,778 $1,917,814 $1,430,710 $220,396 $87,359 $332,179 $49,359 $97,355 $20,717 $37,576 $34,546 $28,555 $26,316 $29,675 $29,115 $100,200 $27,436 $29,115 $48,712 $3,072,546 $2,390,119 $10,178,750 $1,588,590 $5,392,957 $30,063 $27,769 $36,969 $104,851 $46,250 $51,875 $4,447,963 $8,106,914 $2,384,517 $3,196,357 $411,324 $2,768,161 $727,989 $6,552,948 $4,054,733 $1,836,633 $1,881,275 $4,865,679 $7,863,537 $9,728,297 $5,337,556 $3,835,629 $2,861,421 $2,203,959 $873,586 $3,321,793 $493,589 $973,552 $103,584 $187,881 $172,729 $142,777 $131,580 $148,376 $145,577 $501,000 $137,179 $145,577 $243,562 $6,145,092 $4,780,238 $20,357,500 $3,177,180 $10,785,914 $300,625 $277,691 $369,686 $1,048,505 $462,502 $518,751 $1,902,277,283 $390,527,866 $92,573,853 $2,385,379,002 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 104 STATE TRANSPORTATION IMPROVEMENT PROGRAM Appling Project: 0001216 Type Work: Replace Bridge Descp:SR 4/US 1 @ ALTAMAHA RIVER; OVERFLOW & WILLIAMS CREEK - TIA Length: 1.56 Phase CST CST Fund State Bond Year 2014 2015 Federal $0 $0 State $0 $20,256,273 Other $4,969,781 $0 Total $4,969,781 $20,256,273 Total Project Cost: Total Project Authorizations: Total Parcels: $ 25,226,054 $ 4,969,781 7 Project Details: Widen bridges from 2 to 4 lanes-improve operation and mobility-reduce crash frequency-enhance economic development-on a GRIP corridor-on State Freight corridor Also in Toombs County Project: 0008976 Type Work: TE-Landscape/Beautify Descp:ALTAMAHA TECHNICAL COLLEGE LANDSCAPE IMPROVEMENTS Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 106,250 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $85,000 State $0 Other $21,250 Total $106,250 Project: 531340- Type Work: Replace Bridge Descp:CR 305/CR 530 @ BIG SATILLA CREEK & OVERFLOW Length: 0.60 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,145,751 $ 108,120 1 Phase ROW CST CST UTL Fund Local STP STP Local Year 2014 2016 2016 2016 Federal $0 $1,295,685 $2,630,634 $0 State $0 $0 $657,658 $0 Other $108,120 $323,921 $0 $129,733 Total $108,120 $1,619,606 $3,288,292 $129,733 Also in Pierce County Project: M004830 Type Work: Resurface & Maintenance Descp:SR 144 FROM SR 27 TO SR 121 Length: 14.80 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,869,679 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,295,743 State $573,936 Other $0 Total $2,869,679 105 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005170 Type Work: Resurface & Maintenance Descp:SR 19 FROM BACON COUNTY LINE TO SR 135 CONN Length: 10.96 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,264,475 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,811,580 State $452,895 Other $0 Total $2,264,475 Also in Jeff Davis County Appling Totals Summary County Summary excludes lump sum projects. Project PI# 0001216 531340531340531340- Year 2015 2016 2016 2016 Phase CST CST CST UTL Fund Bond STP STP Local Federal $0 $1,762,524 $868,109 $0 State $2,633,316 $440,631 $0 $0 Other $0 $0 $217,027 $86,921 Total $2,633,316 $2,203,156 $1,085,136 $86,921 $2,630,634 $3,073,947 $303,948 $6,008,528 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 106 STATE TRANSPORTATION IMPROVEMENT PROGRAM Atkinson Project: 0010572 Type Work: TE-Bike/Ped Facility Descp:SR 520 FM CS 515/KIRKLAND ST TO NEW HEALTH DEPT; INC NEW LOC Length: 0.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 192,261 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $153,809 State $0 Other $38,452 Project: 0010573 Type Work: TE-Bike/Ped Facility Descp:CS 742/RAILROAD STREET FROM SR 135 TO CS 741/FLORIDA ROAD Length: 0.11 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 249,994 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $199,995 State $0 Other $49,999 Project: 0010574 Type Work: TE-Bike/Ped Facility Descp:CS 500/RAILROAD AVE FROM SR 31 TO CS 503/KING STREET Length: 0.86 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 187,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $150,000 State $0 Other $37,500 Project: M004825 Type Work: Resurface & Maintenance Descp:SR 520/US 82 FROM CR 212/KIRKLAND RD TO CS 515/KIRKLAND ST Length: 1.73 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 689,515 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $551,612 State $137,903 Other $0 Total $192,261 Total $249,994 Total $187,500 Total $689,515 107 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004826 Type Work: Resurface & Maintenance Descp:SR 89/US 441 FROM CLINCH COUNTY LINE TO SR 31 Length: 5.80 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 611,088 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $488,870 State $122,218 Other $0 Total $611,088 Project: M005082 Type Work: Resurface & Maintenance Descp:SR 520 FM TIFT COUNTY LINE TO W OF WILLACOOCHEE CITY LIMITS Length: 18.66 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,224,636 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $4,979,709 State $1,244,927 Other $0 Total $6,224,636 Also in Berrien County 108 STATE TRANSPORTATION IMPROVEMENT PROGRAM Bacon Project: 0010575 Type Work: TE-Bike/Ped Facility Descp:SR 32 FROM CS 512/CHURCH STREET TO SR 4/US 1 Length: 0.27 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 187,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $150,000 State $0 Other $37,500 Project: M004831 Type Work: Resurface & Maintenance Descp:SR 4 FROM N OF CR 118/BEACH RD TO N OF CR 252/TADPOLE TRAIL Length: 9.77 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 764,520 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $611,616 State $152,904 Other $0 Project: M004832 Type Work: Resurface & Maintenance Descp:SR 32 FROM HURRICANE CREEK TO CR 280/DEDGE FARM ROAD Length: 2.15 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 803,993 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $643,194 State $160,799 Other $0 Total $187,500 Total $764,520 Total $803,993 109 STATE TRANSPORTATION IMPROVEMENT PROGRAM Baker Project: 0007153 Type Work: Replace Bridge Descp:SR 200 @ ICHAWAYNOCHAWAY CREEK Length: 0.32 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,929,690 $0 4 Phase ROW CST Fund STP STP Year 2015 2017 Federal $93,220 $3,050,532 State $23,305 $762,633 Other $0 $0 Total $116,525 $3,813,165 Project: 0007154 Type Work: Replace Bridge Descp:SR 216 @ ICHAWAYNOCHAWAY CREEK Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,252,853 $0 5 Phase PE ROW CST UTL Fund STP STP STP STP Year 2017 2017 2017 2017 Federal $8,000 $103,048 $1,673,171 $18,064 State $2,000 $25,762 $418,293 $4,516 Other $0 $0 $0 $0 Total $10,000 $128,809 $2,091,463 $22,580 Project: M004827 Type Work: Resurface & Maintenance Descp:SR 91 FROM SR 37 TO DOUGHERTY COUNTY LINE Length: 10.80 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,325,059 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,060,047 State $265,012 Other $0 Total $1,325,059 Project: M004828 Type Work: Resurface & Maintenance Descp:SR 200 FROM SR 91 TO EARLY COUNTY LINE Length: 18.70 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,130,324 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,504,259 State $626,065 Other $0 Total $3,130,324 110 STATE TRANSPORTATION IMPROVEMENT PROGRAM Baker Totals Summary County Summary excludes lump sum projects. Project PI# 0007153 0007153 0007154 0007154 0007154 0007154 Year 2015 2017 2017 2017 2017 2017 Phase ROW CST PE ROW CST UTL Fund STP STP STP STP STP STP Federal $93,220 $3,050,532 $8,000 $103,048 $1,673,171 $18,064 State $23,305 $762,633 $2,000 $25,762 $418,293 $4,516 Other $0 $0 $0 $0 $0 $0 Total $116,525 $3,813,165 $10,000 $128,809 $2,091,463 $22,580 $4,946,034 $1,236,509 $0 $6,182,542 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 111 STATE TRANSPORTATION IMPROVEMENT PROGRAM Baldwin Project: 0010455 Type Work: Bicycle/Ped. Facility Descp:BALDWIN COUNTY SCHOOL SYSTEM @ 5 SCHOOLS - SRTS Length: 0.00 Phase CST Fund Safety Year LUMP Federal $540,103 Total Project Cost: Total Project Authorizations: Total Parcels: $ 540,103 $0 0 Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2015 - FY 2018 State $0 Other $0 Total $540,103 Project: 0010711 Type Work: TE-Bike/Ped Facility Descp:HISTORIC DOWNTOWN MILLEDGEVILLE STREETSCAPE @ 5 LOCS - PH IV Length: 0.76 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,100,000 $0 22 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $880,000 State $0 Other $220,000 Total $1,100,000 Project: 0010712 Type Work: TE-Bike/Ped Facility Descp:OCONEE RIVER GREENWAY & RIVERWALK @ FISHING CREEK - PH III Length: 1.50 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,250,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $1,000,000 State $0 Other $250,000 Total $1,250,000 Project: 0013260 Type Work: Pedestrian Crossings Descp:SR 22; SR 24; SR 29; SR 44 & SR 57 @ 5 LOCS PED UPGRADES Length: 2.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 795,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $153,000 $562,500 State $17,000 $62,500 Other $0 $0 Total $170,000 $625,000 Also in Putnam, Wilkinson County Project: 270900- Type Work: Replace Bridge Descp:CS 685/BARROWS FERRY RD @ TOBLER CREEK NE MILLEDGEVILLE Length: 0.21 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $81,600 $0 $408,000 $8,160 State $20,400 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $102,000 $10,824 $510,000 $10,200 112 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004815 Type Work: Resurface & Maintenance Descp:SR 24 FROM SR 22 TO CS 328/MARSHALL ROAD Length: 4.12 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,642,084 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,313,667 State $328,417 Other $0 Total $1,642,084 Project: M004816 Type Work: Resurface & Maintenance Descp:SR 22 FROM JONES COUNTY LINE TO LITTLE FISHING CREEK Length: 7.00 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,341,310 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,073,048 State $268,262 Other $0 Total $1,341,310 Project: M004817 Type Work: Resurface & Maintenance Descp:SR 49 FROM JONES COUNTY LINE TO SR 22 Length: 11.20 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,120,570 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $3,296,456 State $824,114 Other $0 Total $4,120,570 Project: M004818 Type Work: Resurface & Maintenance Descp:SR 212 FROM PUTNAM COUNTY LINE TO SR 22 Length: 10.70 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,296,326 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,837,061 State $459,265 Other $0 Total $2,296,326 Project: M004819 Type Work: Resurface & Maintenance Descp:SR 22 FM E OF CR 171/OLD COUNTRY CLUB RD TO HANCOCK CO LINE Length: 9.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,762,864 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,410,291 State $352,573 Other $0 Total $1,762,864 113 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004850 Type Work: Resurface & Maintenance Descp:SR 243 FROM SR 29/US 441 TO SR 22 Length: 4.60 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,762,907 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,410,325 State $352,581 Other $0 Total $1,762,907 Project: M005108 Type Work: Bridges Descp:SR 22 @ 2 LOCS IN BALDWIN CO & SR 150 @ 1 LOC IN MCDUFFIE CO Length: 1.20 Phase PE CST Fund STP STP Year 2014 LUMP Federal $128,000 $600,000 State $32,000 $150,000 Other $0 $0 Total $160,000 $750,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 910,000 $ 160,000 0 Project Details: Substructure strengthening - deck rehab painting - joint replacement and co-polymer overlay Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Also in McDuffie County Project: M005187 Type Work: Resurface & Maintenance Descp:SR 29 FM CR 162/JOHNS GOLDEN RD/WILKINSON TO SR 243/BALDWIN Length: 4.89 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,161,884 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $929,508 State $232,377 Other $0 Total $1,161,884 Also in Wilkinson County Baldwin Totals Summary County Summary excludes lump sum projects. Project PI# 270900- Year 2016 Phase ROW Fund Local Federal $0 State $0 Other $10,824 Total $10,824 $0 $0 $10,824 $10,824 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 114 STATE TRANSPORTATION IMPROVEMENT PROGRAM Banks Project: 0007023 Type Work: Replace Bridge Descp:SR 59 @ GROVE CREEK Length: 0.13 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,870,790 $ 250,000 0 Phase PE ROW CST Fund Bridge STP STP Year 2014 2016 2017 Federal $200,000 $86,561 $1,210,071 State $50,000 $21,640 $302,518 Other $0 $0 $0 Total $250,000 $108,202 $1,512,588 Project: 0007156 Type Work: Replace Bridge Descp:SR 98 @ HICKORY LEVEL CREEK 3.5 MI SW OF HOMER Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,051,204 $0 5 Phase ROW CST UTL Fund STP STP STP Year 2015 2017 2017 Federal $252,960 $1,301,090 $86,913 State $63,240 $325,273 $21,728 Other $0 $0 $0 Total $316,200 $1,626,363 $108,641 Project: 0007157 Type Work: Replace Bridge Descp:SR 323 @ GROVE CREEK 6.5 MI WEST OF HOMER Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,929,746 $0 5 Phase ROW CST Fund STP STP Year 2016 2017 Federal $86,561 $1,457,236 State $21,640 $364,309 Other $0 $0 Total $108,202 $1,821,545 Project: 0007158 Type Work: Replace Bridge Descp:SR 63 @ MIDDLE FORK BROAD RIVER 9 MI NE OF HOMER Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,349,254 $0 6 Phase ROW CST UTL Fund STP STP STP Year 2015 2016 2016 Federal $61,200 $1,787,641 $30,563 State $15,300 $446,910 $7,641 Other $0 $0 $0 Total $76,500 $2,234,551 $38,203 Project: 0013154 Type Work: RRX Warning Device Descp:RAILROAD CROSSING UPGRADES @SEV LOC FM TOCCOA TO OAKWOOD Length: 0.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 505,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $5,000 $500,000 State $0 $0 Other $0 $0 Total $5,000 $500,000 Also in Habersham, Hall, Stephens County 115 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013236 Type Work: Signing Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 15 CR LOCS IN BANKS COUNTY Length: 0.00 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 275,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $275,000 State $0 Other $0 Total $275,000 Project: M004808 Type Work: Resurface & Maintenance Descp:I-85 FROM N OF SR 63/BANKS TO 0.50 MI S OF SR 17/FRANKLIN Length: 17.77 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 50,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $45,000 State $5,000 Other $0 Total $50,000 Also in Franklin County Project: M004810 Type Work: Resurface & Maintenance Descp:SR 15/US 441 FROM JACKSON COUNTY LINE TO CR 18/FAULKNER ROAD Length: 1.30 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 432,120 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $345,696 State $86,424 Other $0 Total $432,120 Project: M004811 Type Work: Resurface & Maintenance Descp:SR 15/US 441 FROM CR 18/FAULKNER ROAD TO SR 164 Length: 2.90 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,204,950 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $963,960 State $240,990 Other $0 Total $1,204,950 116 STATE TRANSPORTATION IMPROVEMENT PROGRAM Banks Totals Summary County Summary excludes lump sum projects. Project PI# 0007023 0007023 0007156 0007156 0007156 0007157 0007157 0007158 0007158 0007158 Year 2016 2017 2015 2017 2017 2016 2017 2015 2016 2016 Phase ROW CST ROW CST UTL ROW CST ROW CST UTL Fund STP STP STP STP STP STP STP STP STP STP Federal $86,561 $1,210,071 $252,960 $1,301,090 $86,913 $86,561 $1,457,236 $61,200 $1,787,641 $30,563 State $21,640 $302,518 $63,240 $325,273 $21,728 $21,640 $364,309 $15,300 $446,910 $7,641 Other $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $108,202 $1,512,588 $316,200 $1,626,363 $108,641 $108,202 $1,821,545 $76,500 $2,234,551 $38,203 $6,360,795 $1,590,199 $0 $7,950,994 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 117 STATE TRANSPORTATION IMPROVEMENT PROGRAM Barrow Project: 0008430 Type Work: Interchange Descp:SR 316/US 29 @ SR 11 Length: 1.76 Phase ROW CST UTL Fund NHPP NHPP NHPP Year 2016 After 2018 After 2018 Federal $2,362,956 $9,906,565 $111,291 State $590,739 $2,476,641 $27,823 Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,476,016 $0 12 Project Details: Grade separating intersection of SR316 & SR11- reduce crash frequency - improve safety- improve traffic operations Project: T004075 Type Work: Transit Projects Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 46,312 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2015 Federal $37,050 State $0 Other $0 $0 $0 Total $2,953,696 $12,383,206 $139,114 Other $9,262 Total $46,312 Project: T004393 Type Work: Transit Projects Descp:FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 50,000 $0 0 Phase Fund CST Transit Year 2016 Federal $40,000 State $0 Other $10,000 Total $50,000 Project: T004859 Type Work: Transit Projects Descp:FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 60,000 $0 0 Phase Fund CST Transit Year 2017 Federal $48,000 State $0 Other $12,000 Total $60,000 118 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project PI# 0008430 T004075 T004393 T004859 Year 2016 2015 2016 2017 Barrow Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Phase Fund Federal State Other ROW CST CST CST NHPP Transit Transit Transit $2,362,956 $37,050 $40,000 $48,000 $590,739 $0 $0 $0 $0 $9,262 $10,000 $12,000 Total $2,953,696 $46,312 $50,000 $60,000 $2,488,006 $590,739 $31,262 $3,110,008 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 119 STATE TRANSPORTATION IMPROVEMENT PROGRAM Bartow Project: 0004915 Type Work: Widening Descp:SR 140 FM SR 53/FLOYD TO 0.3 MI W OF OOTHKALOOGA CRK/BARTOW Lanes: Exist. 2 Prop. 4 Length: 6.20 Phase CST UTL Fund STP STP Year 2016 2016 Federal $25,037,592 $7,610,984 State $6,259,398 $1,902,746 Other $0 $0 Total $31,296,990 $9,513,730 Total Project Cost: Total Project Authorizations: Total Parcels: $ 40,810,720 $0 156 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Also in Floyd County Project: 0007456 Type Work: Pedestrian Crossings Descp:SR 2 @ 2 LOC; SR 3 @ 9 LOC; SR 5 @ 1 LOC IN BARTOW & FANNIN Length: 4.80 Phase ROW CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 585,830 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $158,174 $369,073 State $17,575 $41,008 Other $0 $0 Total $175,749 $410,081 Also in Fannin County Project: 0007494 Type Work: Widening Descp:CS 1054/DOUTHIT FERRY RD FM OLD ALABAMA RD TO SR 61/SR 113 Lanes: Exist. 2 Prop. 4 Length: 2.42 Phase ROW CST UTL Fund Local STP Local Year Federal 2015 $0 After 2018 $10,133,710 After 2018 $0 State $0 $2,533,428 $0 Other $3,802,560 $0 $905,346 Total Project Cost: Total Project Authorizations: Total Parcels: $ 17,375,044 $0 40 Project Details: Widen from 2 to 4 lanes with raised median - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Total $3,802,560 $12,667,138 $905,346 Project: 0007836 Type Work: Widening Descp:SR 20 FROM I-75/BARTOW TO I-575/CHEROKEE Lanes: Exist. 2 Prop. 4 Length: 19.41 Total Project Cost: Total Project Authorizations: Total Parcels: $ 346,626,341 $0 0 Phase PE ROW CST UTL Fund NHPP NHPP NHPP NHPP Year Federal 2017 $5,860,103 After 2018 $46,086,227 After 2018 $193,258,038 After 2018 $32,096,705 State $1,465,026 $11,521,557 $48,314,509 $8,024,176 Other $0 $0 $0 $0 Total $7,325,129 $57,607,783 $241,572,547 $40,120,881 Project Details: provide additional capacity- improve mobility and reduce congestion- enhance economic development- reduce crash frequency. Also in Cherokee County 120 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0008067 Type Work: TE-Bike/Ped Facility Descp:LEAKE MOUNDS-ETOWAH RIVERWALK LINK Length: 1.85 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 938,000 $0 3 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $750,400 State $0 Other $187,600 Total $938,000 Project: 0008382 Type Work: Widening Descp:SR 113 FM OLD ALA RD RELOC TO SR 61 @ NEW ALIGNMENT - PH I Lanes: Exist. 2 Prop. 4 Length: 1.10 Phase PE CST UTL Fund STP STP STP Year 2015 2018 2018 Federal $48,000 $3,380,951 $372,775 State $12,000 $845,238 $93,194 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,752,157 $0 33 Project Details: Widen 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Project: 0009860 Type Work: Replace Bridge Descp:SR 3 @ CR 122/OLD HWY 41 APPROX 4 MI S OF ADAIRSVILLE Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,161,748 $0 9 Phase ROW CST UTL Fund STP STP STP Year 2015 2016 2016 Federal $277,612 $2,156,532 $95,254 State $69,403 $539,133 $23,814 Other $0 $0 $0 Other $0 $0 $0 Total $60,000 $4,226,188 $465,969 Total $347,015 $2,695,665 $119,068 Project: 0010700 Type Work: TE-Bike/Ped Facility Descp:PETTIT CREEK TRAIL - PHASE III Length: 8.50 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,075,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $860,000 State $0 Other $215,000 Total $1,075,000 Project: 0010701 Type Work: TE-Bike/Ped Facility Descp:RAILROAD ST @ 1 LOC; MAIN ST @ 1 LOC; & CHESTNUT ST @ 1 LOC Length: 0.35 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 540,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $432,000 State $0 Other $108,000 Total $540,000 121 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012791 Type Work: RRX Warning Device Descp:CS 551/KING STREET @ CSX #340490G IN ADAIRSVILLE Length: 0.20 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 226,089 $ 26,089 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $26,089 $200,000 State $0 $0 Other $0 $0 Total $26,089 $200,000 Project: 0012792 Type Work: RRX Consolidation Descp:CS 524/PARK STREET @ CSX #340489M IN ADAIRSVILLE Length: 0.20 Phase PE CST Fund HSIP HSIP Year LUMP LUMP Federal $3,000 $7,500 Total Project Cost: Total Project Authorizations: Total Parcels: $ 10,500 $0 0 Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018 State $0 $0 Other $0 $0 Total $3,000 $7,500 Project: 0013176 Type Work: RRX Warning Device Descp:CS 759/CARTER STREET @ CSX #340445M IN CARTERSVILLE Length: 0.40 Phase PE CST Fund STP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 223,935 $ 23,935 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $23,935 $200,000 State $0 $0 Other $0 $0 Total $23,935 $200,000 Project: 0013238 Type Work: Preliminary Engineering Descp:ROME-CARTERSVILLE DEVELOPMENT CORRIDOR - SCOPING Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Phase SCP Fund STP Year 2015 Federal $800,000 State $200,000 Other $0 Total $1,000,000 Project: 621410- Type Work: Widening Descp:SR 113/OLD ALA RD RELOC FM SR 113 -PUMPKINVINE CK- TO CR 699 Lanes: Exist. 2 Prop. 4 Length: 5.35 Phase CST UTL Fund STP STP Year 2018 2018 Federal $36,942,384 $1,852,258 State $9,235,596 $463,064 Total Project Cost: Total Project Authorizations: Total Parcels: $ 48,493,302 $0 106 Project Details: Relocation and widening from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Other $0 $0 Total $46,177,980 $2,315,322 122 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 621500- Type Work: Widening Descp:SR 140 FM 0.3 MI W OF OOTHKALOOGA CRK TO SR 3/US 41 Lanes: Exist. 2 Prop. 4 Length: 1.00 Phase CST UTL Fund STP STP Year 2015 2015 Federal $2,820,828 $689,520 State $705,207 $172,380 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,387,935 $0 34 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Project: 621505- Type Work: Replace Bridge Descp:SR 140 @ OOTHKALOOGA CRK & CSX RR Lanes: Exist. 2 Prop. 5 Length: 0.80 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,980,537 $0 0 Phase CST UTL Fund STP STP Year 2015 2015 Federal $3,069,570 $114,860 State $767,392 $28,715 Other $0 $0 Other $0 $0 Total $3,526,035 $861,900 Total $3,836,962 $143,575 Project: 661950- Type Work: New Construction Descp:US 411 RELOC FM SR 3/US 41 TO I-75; INCL I-75 INTERCHANGE Lanes: Exist. 0 Prop. 4 Length: 7.31 Phase PE ROW ROW Fund STP STP HPP Year 2014 2017 2017 Federal $80,000 $10,272,779 $3,644,028 State $20,000 $2,568,195 $911,007 Total Project Cost: Total Project Authorizations: Total Parcels: $ 220,740,695 $ 100,000 71 ROW ROW ROW CST HPP HPP HPP STP 2017 $12,243,936 2017 $855,472 2017 $2,874,388 After 2018 $139,423,464 $3,060,984 $213,868 $0 $34,855,866 UTL STP After 2018 $5,581,349 $1,395,337 Project Details: New location of a 4 lane road - Improve mobility & connectivity enhance economic development opportunities - State Freight Network Other $0 $0 $375,481 $1,261,618 $88,148 $1,014,775 $0 $0 Total $100,000 $12,840,974 $4,930,516 $16,566,537 $1,157,488 $3,889,163 $174,279,330 $6,976,687 Project: M004835 Type Work: Resurface & Maintenance Descp:SR 3 FROM CS 841/MLK JR BLVD TO N OF SR 293 CONNECTOR Length: 6.20 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,606,540 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,885,232 State $721,308 Other $0 Total $3,606,540 Project: M004836 Type Work: Resurface & Maintenance Descp:SR 113 FROM SR 3 TO I-75 Length: 2.13 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 767,007 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $613,606 State $153,401 Other $0 Total $767,007 123 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005109 Type Work: Bridges Descp:I-59 @ 2 LOCS & I-75 @ 4 LOCS Length: 2.40 Phase PE CST Fund NHPP NHPP Year 2014 LUMP Federal $20,970 $1,485,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,673,300 $ 23,300 0 Project Details: Painting bridge superstructure - on State Freight Network Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $2,330 $165,000 Other $0 $0 Total $23,300 $1,650,000 Also in Dade, Gordon County Project: M005231 Type Work: Bridges Descp:SR 1 @ 6 LOCS; SR 20 @ 6 LOCS & SR 61 @ 1 LOC - BRIDGE REHAB Length: 0.00 Phase PE CST Fund NHPP NHPP Year 2014 LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,220,000 $ 220,000 0 Project Details: Preservation and rehab on State Freight Network on GRIP Network Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Federal $176,000 $800,000 State $44,000 $200,000 Other $0 $0 Total $220,000 $1,000,000 Also in Floyd County Project: T004076 Type Work: Transit Projects Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 40,810 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2015 Federal $32,648 State $0 Other $8,162 Total $40,810 Project: T004394 Type Work: Transit Projects Descp:FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 43,750 $0 0 Phase Fund CST Transit Year 2016 Federal $35,000 State $0 Other $8,750 Total $43,750 Project: T004858 Type Work: Transit Projects Descp:FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 52,500 $0 0 Phase Fund CST Transit Year 2017 Federal $42,000 State $0 Other $10,500 Total $52,500 124 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project PI# Bartow Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Year Phase Fund Federal State Other Total 0004915 0004915 0007494 0007836 0008382 0008382 0008382 0009860 0009860 0009860 0013238 621410621410621500621500621505621505661950661950661950661950661950T004076 T004394 T004858 2016 2016 2015 2017 2015 2018 2018 2015 2016 2016 2015 2018 2018 2015 2015 2015 2015 2017 2017 2017 2017 2017 2015 2016 2017 CST UTL ROW PE PE CST UTL ROW CST UTL SCP CST UTL CST UTL CST UTL ROW ROW ROW ROW ROW CST CST CST STP STP Local NHPP STP STP STP STP STP STP STP STP STP STP STP STP STP HPP HPP HPP HPP STP Transit Transit Transit $17,275,939 $5,251,579 $0 $2,051,036 $48,000 $3,380,951 $372,775 $277,612 $2,156,532 $95,254 $800,000 $36,942,384 $1,852,258 $2,820,828 $689,520 $3,069,570 $114,860 $2,874,388 $855,472 $12,243,936 $3,644,028 $10,272,779 $32,648 $35,000 $42,000 $4,318,985 $1,312,895 $0 $512,759 $12,000 $845,238 $93,194 $69,403 $539,133 $23,814 $200,000 $9,235,596 $463,064 $705,207 $172,380 $767,392 $28,715 $0 $213,868 $3,060,984 $911,007 $2,568,195 $0 $0 $0 $0 $0 $3,802,560 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,014,775 $88,148 $1,261,618 $375,481 $0 $8,162 $8,750 $10,500 $21,594,923 $6,564,474 $3,802,560 $2,563,795 $60,000 $4,226,188 $465,969 $347,015 $2,695,665 $119,068 $1,000,000 $46,177,980 $2,315,322 $3,526,035 $861,900 $3,836,962 $143,575 $3,889,163 $1,157,488 $16,566,537 $4,930,516 $12,840,974 $40,810 $43,750 $52,500 $107,199,348 $26,053,828 $6,569,993 $139,823,169 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 125 STATE TRANSPORTATION IMPROVEMENT PROGRAM Ben Hill Project: 0000313 Type Work: Widening Descp:SR 107 FROM W OF CR 264/IRWIN TO SR 11/US 129/BEN HILL Lanes: Exist. 2 Prop. 4 Length: 10.45 Phase ROW CST UTL Fund STP STP STP Year Federal 2018 $7,615,508 After 2018 $28,293,802 After 2018 $1,882,439 State $1,903,877 $7,073,451 $470,610 Other $0 $0 $0 Total $9,519,385 $35,367,253 $2,353,049 Total Project Cost: Total Project Authorizations: Total Parcels: $ 47,239,687 $0 120 Project Details: Widen from 2 to 4 lanes- improve mobility and reduce congestion- enhance economic development- reduce crash frequency Also in Irwin County Project: 0006529 Type Work: TE-Bike/Ped Facility Descp:JEFFERSON DAVIS HERITAGE TRAIL Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 416,250 $0 11 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $333,000 State $0 Other $83,250 Total $416,250 Project: 0007627 Type Work: Historic Preservation Descp:PRESERVATION OF 1906 AB&A RAILROAD BUILDING IN FITZGERALD Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 618,683 $ 56,244 0 Phase PE CST Fund Local HPP Year LOCL 2015 Federal $0 $449,951 State $0 $0 Other $56,244 $112,488 Total $56,244 $562,439 Project: 0011676 Type Work: Replace Bridge Descp:SR 11 @ HOUSE CREEK 9.5 MI N OF FITZGERALD Length: 0.85 Phase ROW CST UTL Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,939,441 $0 3 Fund STP STP STP Year 2016 2018 2018 Federal $125,680 $2,183,238 $42,635 State $31,420 $545,809 $10,659 Other $0 $0 $0 Total $157,100 $2,729,047 $53,294 Project: 0013261 Type Work: RRX Warning Device Descp:CR 152/LILAC ROAD @ CSX #638280V Length: 0.40 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 225,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $25,000 $200,000 State $0 $0 Other $0 $0 Total $25,000 $200,000 126 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004829 Type Work: Resurface & Maintenance Descp:SR 11 FROM CS 629/BUSH AVE TO WILCOX COUNTY LINE Length: 9.05 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,271,360 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,017,088 State $254,272 Other $0 Total $1,271,360 Project: M004860 Type Work: Resurface & Maintenance Descp:SR 206 FROM N OF BROXTON HWY/BEN HILL TO N OF SR 32/COFFEE Length: 16.35 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,722,636 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,378,109 State $344,527 Other $0 Total $1,722,636 Also in Coffee, Irwin County Project: M005182 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 32/IRWIN TO CS 629/BUSH AVE/BEN HILL Length: 10.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,400,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,720,000 State $680,000 Other $0 Total $3,400,000 Also in Irwin County Ben Hill Totals Summary County Summary excludes lump sum projects. Project PI# 0000313 0007627 0011676 0011676 0011676 Year 2018 2015 2016 2018 2018 Phase ROW CST ROW CST UTL Fund STP HPP STP STP STP Federal $4,797,770 $449,951 $125,680 $2,183,238 $42,635 State $1,199,442 $0 $31,420 $545,809 $10,659 Other $0 $112,488 $0 $0 $0 Total $5,997,212 $562,439 $157,100 $2,729,047 $53,294 $7,599,274 $1,787,331 $112,488 $9,499,092 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 127 STATE TRANSPORTATION IMPROVEMENT PROGRAM Berrien Project: 0010576 Type Work: TE-Bike/Ped Facility Descp:SR 11; SR 76; S JEFFERSON & E WASHINGTON @ 4 LOCS - PH III Length: 0.70 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $200,000 State $0 Other $50,000 Project: 0010577 Type Work: TE-Bike/Ped Facility Descp:SR 37 FROM BAY STREET TO SR 125 Length: 0.25 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 187,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $150,000 State $0 Other $37,500 Project: 0010578 Type Work: TE-Bike/Ped Facility Descp:SR 520 @ 1 LOC & CR 357/MAIN ST @ 2 LOCS IN ENIGMA Length: 0.47 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $200,000 State $0 Other $50,000 Project: 0010936 Type Work: TE-Bike/Ped Facility Descp:CR 356/DOGWOOD STREET FROM SR 125 TO SR 76 Length: 1.01 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 437,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $350,000 State $0 Other $87,500 Total $250,000 Total $187,500 Total $250,000 Total $437,500 128 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004977 Type Work: Resurface & Maintenance Descp:SR 125 FROM SR 11 TO 0.09 MI N OF CR 357/ENIGMA RD Length: 0.68 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 107,467 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $85,974 State $21,493 Other $0 Total $107,467 Project: M005082 Type Work: Resurface & Maintenance Descp:SR 520 FM TIFT COUNTY LINE TO W OF WILLACOOCHEE CITY LIMITS Length: 18.66 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,224,636 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $4,979,709 State $1,244,927 Other $0 Total $6,224,636 Also in Atkinson County Project: M005181 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 37 TO SR 76/SR 125 Length: 10.01 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,526,755 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $3,621,404 State $905,351 Other $0 Total $4,526,755 129 STATE TRANSPORTATION IMPROVEMENT PROGRAM Bleckley Project: 0003625 Type Work: Widening Descp:SR 87 FM 0.2 MI N OF CR 141/FOSKEY RD TO CR 166/DYKES CIRCLE Lanes: Exist. 2 Prop. 4 Length: 4.40 Phase PE ROW CST Fund STP STP STP Year 2014 2014 2018 Federal $164,000 $1,768,000 $10,298,262 State $41,000 $442,000 $2,574,565 Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,287,827 $ 2,415,000 82 Project Details: Widen by 2 additional lanes- provide additional capacity to improve mobility and reduce congestion- enhance economic development and will reduce crash frequency on SR 87 in Bleckley County. Other $0 $0 $0 Total $205,000 $2,210,000 $12,872,827 Project: 222410- Type Work: Widening Descp:SR 87/US 23 FM LOG CABIN/DODGE TO S OF SR 257/BLECKLEY-TIA Lanes: Exist. 2 Prop. 4 Length: 9.50 Total Project Cost: Total Project Authorizations: Total Parcels: $ 31,613,029 $ 6,906,751 220 Phase PE CST CST UTL Fund STP State STP Local Year 2014 2014 2017 2017 Federal $120,000 $0 $19,178,027 $0 State $30,000 $0 $4,794,507 $0 Other $0 $6,756,751 $0 $733,745 Total $150,000 $6,756,751 $23,972,534 $733,745 Project Details: Widen from 2 to 4 lanes - provide additional capacity to improve mobility and reduce congestion - enhance economic development and will reduce crash frequency on SR 87 in Dodge and Bleckley county. Also in Dodge County Project: M004189 Type Work: Signing Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,700,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Project: M004852 Type Work: Resurface & Maintenance Descp:SR 26 FROM N OF CR 18/BARLOW ROAD TO SR 87BU Length: 3.44 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 791,002 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,700,000 Federal $632,802 State $0 Other $0 Total $1,700,000 Also in Emanuel, Laurens, Treutlen County State $158,200 Other $0 Total $791,002 130 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004853 Type Work: Resurface & Maintenance Descp:SR 112 FROM SR 87 TO TWIGGS COUNTY LINE Length: 12.75 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,540,904 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,032,723 State $508,181 Other $0 Total $2,540,904 Project: M004854 Type Work: Resurface & Maintenance Descp:SR 126 FROM SR 26 TO GUM SWAMP CREEK Length: 5.40 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 993,352 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $794,681 State $198,670 Other $0 Total $993,352 Bleckley Totals Summary County Summary excludes lump sum projects. Project PI# 0003625 222410222410- Year 2018 2017 2017 Phase CST CST UTL Fund STP STP Local Federal $10,298,262 $3,068,484 $0 State $2,574,565 $767,121 $0 Other $0 $0 $117,399 Total $12,872,827 $3,835,605 $117,399 $13,366,746 $3,341,687 $117,399 $16,825,832 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 131 STATE TRANSPORTATION IMPROVEMENT PROGRAM Brantley Project: 0007161 Type Work: Replace Bridge Descp:SR 32 @ LITTLE SATILLA RIVER OVERFLOW 6 MI SE OF PATTERSON Length: 0.25 Phase PE CST Fund NHPP NHPP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,230,825 $0 0 Year 2016 2016 Federal $8,000 $976,660 State $2,000 $244,165 Other $0 $0 Total $10,000 $1,220,825 Project: M004596 Type Work: Resurface & Maintenance Descp:SR 520 FM .20 MI W OF CR 184/PALOMA ST TO .02 MI W OF SR 110 Length: 6.58 Phase CST Fund STP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,651,010 $ 2,651,010 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,120,808 State $530,202 Other $0 Total $2,651,010 Project: M004601 Type Work: Resurface & Maintenance Descp:SR 520 FM CR 229/OLD POST RD/BRANTLEY TO COLLEGE CREEK/GLYNN Length: 6.70 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,473,476 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,978,781 State $494,695 Other $0 Total $2,473,476 Also in Glynn County Project: M004833 Type Work: Resurface & Maintenance Descp:SR 520 FROM E OF CR 278/GALLBERRY RD TO CR 168/BROWNTOWN RD Length: 2.90 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,024,950 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $819,960 State $204,990 Other $0 Total $1,024,950 Project: M004834 Type Work: Resurface & Maintenance Descp:SR 520 FROM NAHUNTA CITY LIMITS TO E OF CS 528/MORGAN CIRCLE Length: 1.90 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 842,075 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $673,660 State $168,415 Other $0 Total $842,075 132 STATE TRANSPORTATION IMPROVEMENT PROGRAM Brantley Totals Summary County Summary excludes lump sum projects. Project PI# Year Phase Fund Federal State Other Total 0007161 0007161 2016 PE 2016 CST NHPP NHPP $8,000 $976,660 $2,000 $244,165 $0 $10,000 $0 $1,220,825 $984,660 $246,165 $0 $1,230,825 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 133 STATE TRANSPORTATION IMPROVEMENT PROGRAM Brooks Project: 0000545 Type Work: Widening Descp:SR 133 FM CR 1/OLD QUITMAN ADEL RD/BROOKS TO CR 256/COLQUITT Lanes: Exist. 2 Prop. 4 Length: 9.63 Phase PE CST UTL Fund NHPP NHPP NHPP Year 2014 2016 2016 Federal $1,072,800 $23,623,347 $355,504 State $268,200 $5,905,837 $88,876 Other $0 $0 $0 Total $1,341,000 $29,529,183 $444,380 Total Project Cost: Total Project Authorizations: Total Parcels: $ 31,314,563 $ 1,341,000 105 Project Details: widen from 2 to 4 lanes- turn lanes added as needed- improve mobility-reduce congestion-enhance economic development- reduce crash frequency- GRIP Also in Colquitt County Project: 0010855 Type Work: Signals Descp:SR 35 @ 5 LOC; SR 38 @ 3 LOC &SR 133 @ 1 LOC-SIGNAL UPGRADES Length: 3.60 Phase ROW CST Fund STP STP Year LUMP LUMP Federal $156,000 $1,283,050 State $0 $0 Other $0 $0 Total $156,000 $1,283,050 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,439,050 $0 3 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Also in Colquitt County Project: 0011723 Type Work: RRX Warning Device Descp:MLK JR DR @ CSX #643305Y; INC 3 CLOSURES IN QUITMAN Length: 1.75 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 275,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $25,000 $250,000 State $0 $0 Other $0 $0 Total $25,000 $250,000 Project: M005163 Type Work: Resurface & Maintenance Descp:SR 76 FROM FLORIDA STATE LINE TO SR 333 Length: 9.90 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,130,003 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $904,002 State $226,001 Other $0 Total $1,130,003 134 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005192 Type Work: Resurface & Maintenance Descp:SR 76 FROM SR 333 TO COOK COUNTY LINE Length: 18.34 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,309,663 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $5,847,730 State $1,461,933 Other $0 Total $7,309,663 Brooks Totals Summary County Summary excludes lump sum projects. Project PI# 0000545 0000545 Year 2016 2016 Phase CST UTL Fund NHPP NHPP Federal $18,189,977 $273,738 State $4,547,494 $68,434 Other $0 $0 Total $22,737,471 $342,172 $18,463,715 $4,615,929 $0 $23,079,643 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 135 STATE TRANSPORTATION IMPROVEMENT PROGRAM Bryan Project: 0010739 Type Work: Operational Improvement Descp:SR 144 @ I-95 SB & NB OFF RAMPS Length: 0.40 Phase CST Fund STP Total Project Cost: Total Project Authorizations: Total Parcels: $ 800,000 $0 0 Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2015 - FY 2018 Year LUMP Federal $640,000 State $160,000 Other $0 Total $800,000 Project: 0010913 Type Work: Slope Repair Descp:SR 144 SPUR @OGEECHEE RIVER-INSTALL RIP RAP SCOUR PROTECTION Length: 0.28 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,612,065 $0 0 Phase ROW CST Fund STP STP Year 2017 2018 Federal $119,241 $4,370,411 State $29,810 $1,092,603 Other $0 $0 Total $149,051 $5,463,014 Project: 0012659 Type Work: Interchange Descp:I-95 @ CR 90/BELFAST SIDING ROAD - NEW INTERCHANGE Lanes: Exist. 0 Prop. 6 Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,046,949 $ 1,894,000 0 Phase PE PE ROW CST Fund Local Local Local STP Year 2014 2014 2016 2018 Federal $0 $0 $0 $6,922,359 State $0 $0 $0 $1,730,590 Other $1,800,000 $94,000 $1,500,000 $0 Project Details: Interchange- 0 to 4 lanes- bike/ped improvements- improve mobility and connectivity-enhance economic development- State Freight Corridor Project: 0012830 Type Work: Operational Improvement Descp:I-95 @ SR 25/US 17 - SB RAMPS Length: 0.40 Phase PE CST Fund STP STP Total Project Cost: Total Project Authorizations: Total Parcels: $ 415,000 $ 125,000 0 Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $100,000 $232,000 State $25,000 $58,000 Other $0 $0 Total $1,800,000 $94,000 $1,500,000 $8,652,949 Total $125,000 $290,000 Project: 0012843 Type Work: Signals Descp:SR 25 @ 4 LOC; SR 26 @ 5 LOC &SR 204 @ 1 LOC-SIGNAL UPGRADES Length: 4.00 Phase PE ROW CST Fund STP STP STP Year 2014 LUMP LUMP Federal $250,000 $225,000 $1,000,000 State $0 $0 $0 Other $0 $0 $0 Total $250,000 $225,000 $1,000,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,475,000 $ 250,000 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Also in Chatham County 136 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 532370- Type Work: Widening Descp:SR 144 EB FROM S OF CR 100 TO S OF CR 154 Lanes: Exist. 2 Prop. 4 Length: 5.05 Total Project Cost: Total Project Authorizations: Total Parcels: $ 27,453,270 $ 11,386,346 98 Phase PE ROW CST UTL Fund STP STP STP STP Year 2014 2014 2017 2017 Federal $381,077 $8,728,000 $12,052,539 $801,000 State $95,269 $2,182,000 $3,013,135 $200,250 Project Details: Widen from 2 to 4 lanes- improve mobility and reduce congestion-enhance economic development- reduce crash frequency- incorporate bike lanes and sidewalks- Project: M003079 Type Work: Bridges Descp:I-95 @ CSX RR - BRIDGE REHAB Length: 0.40 Phase CST Fund NHPP Year LUMP Federal $632,696 Total Project Cost: Total Project Authorizations: Total Parcels: $ 702,996 $0 0 Project Details: Maintenance- improve safety- State Freight Corridor Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $70,300 Other $0 $0 $0 $0 Total $476,346 $10,910,000 $15,065,674 $1,001,250 Other $0 Total $702,996 Project: M004591 Type Work: Resurface & Maintenance Descp:SR 144 FM FORT STEWART ENTRANCE/BRYAN TO TRINITY RD/LIBERTY Length: 11.62 Phase CST Fund NHPP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,231,620 $ 2,231,620 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,785,296 State $446,324 Other $0 Total $2,231,620 Also in Liberty County Project: M004599 Type Work: Resurface & Maintenance Descp:SR 67 FROM SR 30/US 280 TO BULLOCH COUNTY LINE Length: 4.20 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 561,427 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $449,142 State $112,285 Other $0 Total $561,427 137 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004865 Type Work: Resurface & Maintenance Descp:SR 144 FROM I-95 TO SR 25/US 17 Length: 3.40 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,224,331 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $979,464 State $244,866 Other $0 Total $1,224,331 Project: M004866 Type Work: Resurface & Maintenance Descp:SR 30/US 280 FROM CS 513/N POPLAR ST TO CS 503/WARNELL ST Length: 0.69 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 238,914 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $191,132 State $47,783 Other $0 Total $238,914 Project: M004867 Type Work: Resurface & Maintenance Descp:SR 144 FM RICHMOND HILL CITY LIMITS TO S OF CR 230/BROWN RD Length: 12.44 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,412,082 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,929,665 State $482,416 Other $0 Total $2,412,082 Project: M004995 Type Work: Bridges Descp:I-16 EB & WB @ BLACK CREEK - SCOUR REPAIR Length: 0.80 Phase PE CST Fund NHPP NHPP Year LUMP LUMP Federal $157,500 $585,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 825,000 $0 0 Project Details: Maintenance- improve safety- State Freight Corridor Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $17,500 $65,000 Other $0 $0 Total $175,000 $650,000 138 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005053 Type Work: Resurface & Maintenance Descp:SR 119 FROM I-16 TO CS 586/PAYNE DRIVE Length: 6.63 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,523,846 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,219,077 State $304,769 Other $0 Total $1,523,846 Also in Bulloch County Bryan Totals Summary County Summary excludes lump sum projects. Project PI# 0010913 0010913 0012659 0012659 532370532370- Year 2017 2018 2016 2018 2017 2017 Phase ROW CST ROW CST CST UTL Fund STP STP Local STP STP STP Federal $119,241 $4,370,411 $0 $6,922,359 $12,052,539 $801,000 State $29,810 $1,092,603 $0 $1,730,590 $3,013,135 $200,250 Other $0 $0 $1,500,000 $0 $0 $0 Total $149,051 $5,463,014 $1,500,000 $8,652,949 $15,065,674 $1,001,250 $24,265,550 $6,066,388 $1,500,000 $31,831,938 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 139 STATE TRANSPORTATION IMPROVEMENT PROGRAM Bulloch Project: 0005829 Type Work: Passing Lanes Descp:SR 26 FROM CR 491/AMANDA ROAD TO CR 423/OLD LEE FIELD ROAD Length: 3.10 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,965,557 $ 150,000 43 Phase PE ROW CST UTL Fund STP STP STP STP Year 2014 2016 2018 2018 Federal $120,000 $961,879 $2,625,587 $264,979 State $30,000 $240,470 $656,397 $66,245 Project Details: Improve passing opportunities- address operational and safety issues -constructing passing lanes and turn lanes along a 2 lane undivided section of US 80/SR 26 in Bulloch County. Project: 0010364 Type Work: Intersection Improvement Descp:SR 26 @ CR 585/BURKHALTER ROAD Length: 0.47 Phase ROW CST Fund HSIP HSIP Year 2014 LUMP Federal $459,000 $716,631 State $51,000 $79,626 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,306,257 $ 510,000 6 Project Details: Will improve the capacity and operations of the intersection to enhance mobility- exisiting intersection is a two way - proposed project will convert into a roundabout on SR 26 in Bulloch County Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Other $0 $0 $0 $0 Other $0 $0 Total $150,000 $1,202,349 $3,281,984 $331,224 Total $510,000 $796,257 Project: 0010428 Type Work: Intersection Improvement Descp:CR 248/LANGSTON CHAPEL ROAD @ CR 585/HARVILLE ROAD Length: 0.20 Phase PE CST Fund Safety Safety Year LUMP LUMP Federal $90,000 $675,000 State $10,000 $75,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 850,000 $0 0 Project Details: Will improve the capacity and operations of the intersection to enhance mobility on CR 248 in Bulloch County Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018 Other $0 $0 Total $100,000 $750,000 Project: 0011765 Type Work: RRX Warning Device Descp:CS 699/ZETTEROWER AVE @ GSFR #620181T IN STATESBORO Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 265,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $265,000 State $0 Other $0 Total $265,000 140 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 522460- Type Work: Widening Descp:SR 67 FM I-16 TO STATESBORO BYPASS Lanes: Exist. 2 Prop. 4 Length: 10.86 Phase ROW CST UTL Fund STP STP STP Year 2016 2018 2018 Federal $5,999,363 $23,790,189 $644,708 State $1,499,841 $5,947,547 $161,177 Total Project Cost: Total Project Authorizations: Total Parcels: $ 38,042,824 $0 77 Project Details: Widen 2 to 4 lane- provide additional capacity to improve mobility and reduce congestio between Statesboro and I-16- enhance economic development and will reduce crash frequency. Project: M004594 Type Work: Resurface & Maintenance Descp:SR 67 FROM 0.46 MI S OF CR 585/HARVILLE ROAD TO SR 73 Length: 3.33 Phase CST Fund STP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,626,637 $ 2,626,637 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,101,310 State $525,327 Other $0 $0 $0 Total $7,499,203 $29,737,736 $805,885 Other $0 Total $2,626,637 Project: M004598 Type Work: Resurface & Maintenance Descp:SR 26/SR 67 FROM MILL CREEK TO CS 619/NORTH COLLEGE STREET Length: 6.78 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,015,146 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,412,117 State $603,029 Other $0 Total $3,015,146 Project: M004868 Type Work: Resurface & Maintenance Descp:SR 26 FROM CS 720/CARMEL DRIVE TO CR 491/AMANDA ROAD Length: 2.70 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 972,263 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $777,810 State $194,453 Other $0 Total $972,263 Project: M005053 Type Work: Resurface & Maintenance Descp:SR 119 FROM I-16 TO CS 586/PAYNE DRIVE Length: 6.63 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,523,846 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,219,077 State $304,769 Other $0 Total $1,523,846 Also in Bryan County 141 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005079 Type Work: Resurface & Maintenance Descp:SR 24 FROM SR 26 TO CR 445/CLITO ROAD Length: 6.50 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,440,418 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,152,334 State $288,084 Other $0 Total $1,440,418 Project: M005080 Type Work: Resurface & Maintenance Descp:SR 73 FROM CLAXTON CITY LIMITS TO STATESBORO CITY LIMITS Length: 8.55 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,078,831 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,463,065 State $615,766 Other $0 Total $3,078,831 Also in Evans County Project: M005096 Type Work: Resurface & Maintenance Descp:SR 119 CONN FROM SR 26 TO SR 119 Length: 5.98 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,118,110 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $894,488 State $223,622 Other $0 Total $1,118,110 Project: M005101 Type Work: Resurface & Maintenance Descp:SR 26/US 80 FROM S OF CS 906/STOCKYARD ROAD TO SR 67 Length: 5.46 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 907,452 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $725,962 State $181,490 Other $0 Total $907,452 Project: M005143 Type Work: Resurface & Maintenance Descp:SR 67 FROM BRYAN COUNTY LINE TO I-16 Length: 5.80 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,204,950 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $963,960 State $240,990 Other $0 Total $1,204,950 142 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005185 Type Work: Resurface & Maintenance Descp:SR 67 FROM I-16 TO 0.25 MI N OF CR 1197/SOUTHBEND DRIVE Length: 8.60 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,667,516 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,334,013 State $333,503 Other $0 Total $1,667,516 Bulloch Totals Summary County Summary excludes lump sum projects. Project PI# 0005829 0005829 0005829 522460522460522460- Year 2016 2018 2018 2016 2018 2018 Phase ROW CST UTL ROW CST UTL Fund STP STP STP STP STP STP Federal $961,879 $2,625,587 $264,979 $5,999,363 $23,790,189 $644,708 State $240,470 $656,397 $66,245 $1,499,841 $5,947,547 $161,177 Other $0 $0 $0 $0 $0 $0 Total $1,202,349 $3,281,984 $331,224 $7,499,203 $29,737,736 $805,885 $34,286,705 $8,571,676 $0 $42,858,381 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 143 STATE TRANSPORTATION IMPROVEMENT PROGRAM Burke Project: 0013258 Type Work: Pedestrian Crossings Descp:SR 4; SR 17 & SR 24 @ 4 LOCS - PEDESTRIAN UPGRADES Length: 1.60 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 636,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Project: M005037 Type Work: Resurface & Maintenance Descp:SR 56 FROM EMANUEL COUNTY LINE TO SR 24 Length: 21.90 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,691,910 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $122,400 $450,000 Federal $2,153,528 State $13,600 $50,000 Other $0 $0 Total $136,000 $500,000 Also in Jefferson, McDuffie County State $538,382 Other $0 Total $2,691,910 Project: M005038 Type Work: Resurface & Maintenance Descp:SR 56 FROM SR 121 BYPASS TO SR 56 SPUR Length: 11.19 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,571,991 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,257,593 State $314,398 Other $0 Total $1,571,991 Project: M005147 Type Work: Resurface & Maintenance Descp:SR 80 FROM SR 56 SPUR TO SR 56 Length: 8.80 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,618,795 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,295,036 State $323,759 Other $0 Total $1,618,795 144 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005148 Type Work: Resurface & Maintenance Descp:SR 24 FM 0.08 MI W OF CS 543/CEMETERY ROAD TO SR 121 BYPASS Length: 14.90 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,197,688 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,558,150 State $639,538 Other $0 Total $3,197,688 145 STATE TRANSPORTATION IMPROVEMENT PROGRAM Butts Project: 0000760 Type Work: Widening Descp:SR 16 WIDEN FM I-75 TO CITY OF JACKSON Lanes: Exist. 2 Prop. 4 Length: 7.36 Total Project Cost: Total Project Authorizations: Total Parcels: $ 48,152,838 $0 0 Phase SCP PE ROW CST Fund STP STP STP STP Year Federal 2015 $800,000 After 2018 $4,416,323 After 2018 $12,990,915 After 2018 $20,315,032 State $200,000 $1,104,081 $3,247,729 $5,078,758 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Project: 0007580 Type Work: Sidewalks Descp:ROAD IMPROVEMENTS & UTILITY RELOCATIONS IN JACKSON Length: 0.00 Phase PE ROW CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 674,438 $0 0 Fund Local Local HPP Year 2016 2016 After 2018 Federal $0 $0 $449,950 State $0 $0 $0 Other $0 $0 $0 $0 Total $1,000,000 $5,520,404 $16,238,644 $25,393,790 Other $62,000 $50,000 $112,488 Total $62,000 $50,000 $562,438 Project: 0009966 Type Work: Roundabout Descp:SR 42 @ SR 87 Length: 0.30 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,320,067 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $400,000 $920,067 State $0 $0 Other $0 $0 Total $400,000 $920,067 Project: 333171- Type Work: Replace Bridge Descp:SR 36 @ YELLOW WATER CREEK 1 MI N OF JCT SR 42 Length: 0.50 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,634,166 $0 15 Phase ROW CST UTL Fund STP STP Local Year 2018 After 2018 After 2018 Federal $58,114 $2,814,537 $0 State $14,529 $703,634 $0 Other $0 $0 $43,351 Total $72,643 $3,518,172 $43,351 Project: M004824 Type Work: Resurface & Maintenance Descp:SR 16 FROM SR 42 TO JASPER COUNTY LINE Length: 7.39 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,167,916 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $934,333 State $233,583 Other $0 Total $1,167,916 146 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004855 Type Work: Resurface & Maintenance Descp:SR 42 FROM MONROE COUNTY LINE TO SR 16 Length: 8.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,162,967 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,730,374 State $432,593 Other $0 Total $2,162,967 Project: M004856 Type Work: Resurface & Maintenance Descp:SR 16 FROM SR 42 TO I-75 Length: 6.80 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,667,870 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,334,296 State $333,574 Other $0 Total $1,667,870 Butts Totals Summary County Summary excludes lump sum projects. Project PI# 0000760 0007580 0007580 333171- Year 2015 2016 2016 2018 Phase SCP PE ROW ROW Fund STP Local Local STP Federal $800,000 $0 $0 $58,114 State $200,000 $0 $0 $14,529 Other $0 $62,000 $50,000 $0 Total $1,000,000 $62,000 $50,000 $72,643 $858,114 $214,529 $112,000 $1,184,643 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 147 STATE TRANSPORTATION IMPROVEMENT PROGRAM Calhoun Project: 0009862 Type Work: Replace Bridge Descp:SR 45 @ CORDRAYS POND DRAIN & OVERFLOW Length: 0.46 Phase ROW CST Fund Bridge STP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,537,966 $ 90,000 3 Year 2014 2016 Federal $72,000 $1,958,373 State $18,000 $489,593 Other $0 $0 Total $90,000 $2,447,966 Project: 0010597 Type Work: TE-Bike/Ped Facility Descp:SR 37; SR 45; CS 555/COURT ST & CS 560/WHITNEY ST @ 4 LOCS Length: 0.32 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 266,324 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $213,059 State $0 Other $53,265 Total $266,324 Project: 0013149 Type Work: Signing Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 9 LOCS IN CALHOUN COUNTY Length: 18.49 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 77,025 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $77,025 State $0 Other $0 Total $77,025 Project: 442951- Type Work: Replace Bridge Descp:SR 234 @ CHICKASAWHATCHEE CREEK 8 MI NE OF LEARY Length: 1.54 Phase ROW CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,422,597 $0 4 Fund STP STP Year 2016 2017 Federal $291,312 $6,446,765 State $72,828 $1,611,691 Other $0 $0 Total $364,140 $8,058,457 Also in Dougherty County Project: M005015 Type Work: Resurface & Maintenance Descp:SR 45 FROM SR 62 TO SR 37 Length: 11.59 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,424,622 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,139,698 State $284,924 Other $0 Total $1,424,622 148 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005164 Type Work: Resurface & Maintenance Descp:SR 62 FROM SR 45 TO DOUGHERTY COUNTY LINE Length: 18.42 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,396,280 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,717,024 State $679,256 Other $0 Total $3,396,280 Project: M005206 Type Work: Resurface & Maintenance Descp:SR 37 FROM SR 1 TO BAKER COUNTY LINE Length: 27.54 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,901,614 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,321,291 State $580,323 Other $0 Total $2,901,614 Also in Clay County Calhoun Totals Summary County Summary excludes lump sum projects. Project PI# 0009862 442951442951- Year 2016 2016 2017 Phase CST ROW CST Fund STP STP STP Federal $1,958,373 $145,656 $3,223,383 State $489,593 $36,414 $805,846 Other $0 $0 $0 Total $2,447,966 $182,070 $4,029,228 $5,327,411 $1,331,853 $0 $6,659,264 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 149 STATE TRANSPORTATION IMPROVEMENT PROGRAM Camden Project: 0000820 Type Work: Widening Descp:SR 40 FM E OF ST MARYS RIVER TRIB TO E OF CR 66/COLERAIN RD Lanes: Exist. 2 Prop. 4 Length: 11.47 Total Project Cost: Total Project Authorizations: Total Parcels: $ 33,408,629 $0 64 Phase ROW ROW CST UTL Fund HPP HPP NHPP NHPP Year Federal 2016 $1,812,278 2016 $711,507 After 2018 $23,920,474 After 2018 $282,645 State $453,069 $177,877 $5,980,119 $70,661 Other $0 $0 $0 $0 Total $2,265,347 $889,383 $29,900,593 $353,306 Project Details: Widen from 2 to 4 lanes-improve operation and mobility-enhance economic development-on GRIP corridor Also in Charlton County Project: 0002861 Type Work: Turn Lanes Descp:SR 40 FM W OF CS 481/GROVE BLVD TO E OF PR 718/TRUSS PLANT Length: 1.44 Phase CST Fund NHPP Year 2018 Federal $5,470,064 State $1,367,516 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,837,580 $0 19 Project Details: Add center turn lane-reduce congestion-improve operation and mobility-reduce crash frequency-enhance economic development-on GRIP corridor Project: 0007414 Type Work: Widening Descp:CR 90/COLERAIN ROAD FM W OF I-95 TO E OF KINGS BAY ROAD Lanes: Exist. 2 Prop. 4 Length: 5.85 Phase PE CST UTL Fund STP STP STP Year 2015 2017 2017 Federal $40,000 $19,746,022 $2,384,815 State $10,000 $4,936,505 $596,204 Total Project Cost: Total Project Authorizations: Total Parcels: $ 27,713,546 $0 94 Project Details: Widen from two to four lanes-improve operations and mobility-reduce crash frequency Other $0 Total $6,837,580 Other $0 $0 $0 Total $50,000 $24,682,527 $2,981,018 Project: 0008666 Type Work: Widening Descp:KINGSLAND BYPASS FROM CR 61/VACUNA ROAD TO W OF I-95 Lanes: Exist. 2 Prop. 4 Length: 4.85 Total Project Cost: Total Project Authorizations: Total Parcels: $ 22,463,791 $0 64 Phase ROW CST CST CST UTL Fund HPP STP HPP HPP STP Year 2016 2018 2018 2018 2018 Project Details: New alignment-improve operation and mobility-reduce crash frequency Federal $2,127,200 $13,586,433 $1,497,356 $419,900 $340,143 State $531,800 $3,396,608 $374,339 $104,975 $85,036 Other $0 $0 $0 $0 $0 Total $2,659,000 $16,983,042 $1,871,695 $524,875 $425,179 150 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009436 Type Work: RRX Warning Device Descp:SR 40 SPUR @ SMR #861077N IN ST MARYS Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 159,181 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $159,181 State $0 Other $0 Total $159,181 Project: 0010579 Type Work: TE-Bike/Ped Facility Descp:SR 40 FROM CS 456/WEST STREET TO CS 457/EAST STREET Length: 0.46 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 7 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $200,000 State $0 Other $50,000 Total $250,000 Project: 0010580 Type Work: TE-Bike/Ped Facility Descp:ST MARYS FM READY ST TO WATERFRONT-MULTI-USE TRAIL - PH III Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $200,000 State $0 Other $50,000 Total $250,000 Project: M004900 Type Work: Resurface & Maintenance Descp:SR 40 FROM E OF CS 556//HENRIETTA ST TO CS 599/KINGS BAY RD Length: 4.17 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,220,529 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $976,423 State $244,106 Other $0 Total $1,220,529 Project: M004904 Type Work: Resurface & Maintenance Descp:SR 40 FROM CS 432/JULIA STREET TO CS 416/CHURCH STREET Length: 1.94 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 806,070 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $644,856 State $161,214 Other $0 Total $806,070 151 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005054 Type Work: Resurface & Maintenance Descp:SR 40 FROM CHARLTON COUNTY LINE TO E OF CS 556/HENRIETTA ST Length: 13.40 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,083,017 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $3,266,414 State $816,603 Other $0 Total $4,083,017 Project: M005112 Type Work: Bridges Descp:I-95 SB & NB @ LITTLE SATILLA RIVER - BRIDGE REHAB Length: 0.80 Phase PE CST Fund NHPP NHPP Year 2014 LUMP Federal $139,500 $900,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,155,000 $ 155,000 0 Project Details: Maintenance project-improves safety Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $15,500 $100,000 Other $0 $0 Total $155,000 $1,000,000 Also in Glynn County Camden Totals Summary County Summary excludes lump sum projects. Project PI# 0000820 0000820 0002861 0007414 0007414 0007414 0008666 0008666 0008666 0008666 0008666 Year 2016 2016 2018 2015 2017 2017 2016 2018 2018 2018 2018 Phase ROW ROW CST PE CST UTL ROW CST CST CST UTL Fund HPP HPP NHPP STP STP STP HPP HPP HPP STP STP Federal $619,011 $1,576,682 $5,470,064 $40,000 $19,746,022 $2,384,815 $2,127,200 $419,900 $1,497,356 $13,586,433 $340,143 State $154,753 $394,170 $1,367,516 $10,000 $4,936,505 $596,204 $531,800 $104,975 $374,339 $3,396,608 $85,036 Other $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $773,763 $1,970,852 $6,837,580 $50,000 $24,682,527 $2,981,018 $2,659,000 $524,875 $1,871,695 $16,983,042 $425,179 $47,807,626 $11,951,906 $0 $59,759,532 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 152 STATE TRANSPORTATION IMPROVEMENT PROGRAM Candler Project: 0006495 Type Work: RRX Warning Device Descp:CS 587/MLK JR BLVD @ OGE RR #620236D Length: 0.13 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 179,264 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $179,264 State $0 Other $0 Project: 0010818 Type Work: TE-Bike/Ped Facility Descp:METTER DOWNTOWN STREETSCAPES @ 4 LOCS - PHASE III Length: 0.25 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 291,034 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $232,827 State $0 Other $58,207 Total $179,264 Total $291,034 153 STATE TRANSPORTATION IMPROVEMENT PROGRAM Carroll Project: 0005827 Type Work: Intersection Improvement Descp:SR 166 @ HAYS MILL ROAD IN CARROLLTON Length: 0.15 Phase CST Fund NHPP Year 2017 Federal $346,194 State $86,549 Total Project Cost: Total Project Authorizations: Total Parcels: $ 432,743 $0 8 Project Details: Intersection safety improvments- Intersection capacity & operational improvements- enhanced mobility Project: 0006026 Type Work: Intersection Improvement Descp:SR 5 @ SR 16/US 27 ALT Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,506,942 $ 95,000 0 Phase PE ROW CST UTL Fund HSIP HSIP HSIP HSIP Year 2014 LUMP LUMP LUMP Federal $85,500 $369,705 $571,103 $329,940 State $9,500 $41,078 $63,456 $36,660 Project Details: Intersection reconstruction including roundabout improve operation reduce crash frequency and severity Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Other $0 Other $0 $0 $0 $0 Project: 0007640 Type Work: Multi-use Trail Descp:CHATTAHOOCHEE HILLS REGIONAL GREENWAY TRAIL - CARROLL Length: 0.00 Phase CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 562,437 $0 0 Fund HPP Year 2016 Federal $449,950 State $0 Other $112,487 Total $432,743 Total $95,000 $410,783 $634,559 $366,600 Total $562,437 Project: 0010457 Type Work: TE-Bike/Ped Facility Descp:VILLA RICA TRAILHEAD Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 625,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $500,000 State $0 Other $125,000 Total $625,000 154 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0010493 Type Work: Signing Descp:CR 392 FROM SR 61 TO CR 384 & CR 824 FROM SR 113 TO CR 753 Length: 2.82 Phase PE CST Fund Safety Safety Total Project Cost: Total Project Authorizations: Total Parcels: $ 45,000 $0 0 Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $10,000 $35,000 State $0 $0 Other $0 $0 Total $10,000 $35,000 Project: 0010948 Type Work: TE-Bike/Ped Facility Descp:CARROLTON GREENBELT FM SR 166 BYPASS TO E OF STRICKLAND RD Length: 1.42 Phase CST CST Fund HPP STP Year 2015 LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,182,150 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $251,972 $1,493,748 State $0 $0 Other $62,993 $373,437 Total $314,965 $1,867,185 Project: 631490- Type Work: New Construction Descp:VILLA RICA BYP EXTEND W FM PROPOSED SR 61 BYPASS TO SR 101 Lanes: Exist. 0 Prop. 2 Length: 2.42 Phase ROW CST Fund STP STP Year 2016 2018 Federal $4,034,288 $4,946,902 State $1,008,572 $1,236,726 Total Project Cost: Total Project Authorizations: Total Parcels: $ 11,226,488 $0 48 Project Details: New location of a 2 lane bypass - Improve mobility & connectivity enhance economic development opportunities Project: 662540- Type Work: New Construction Descp:SR 61 CONN FM SR 61 TO S OF SHORELINE PKWY Lanes: Exist. 0 Prop. 2 Length: 1.10 Phase ROW CST Fund STP STP Year 2017 After 2018 Federal $3,931,411 $3,019,330 State $982,853 $754,833 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,688,427 $0 37 Project Details: New location of a 2 lane bypass - Improve mobility & connectivity enhance economic development opportunities Project: M003688 Type Work: Weigh Station Descp:I-20 FM PLEASANT RIDGE RD TO LEVANS RD NEW WEIGH STATION Length: 1.72 Phase PE ROW CST Fund NHPP NHPP NHPP Year Federal LUMP $1,241,594 LUMP $253,387 After 2018 $31,190,194 State $137,955 $28,154 $3,465,577 Total Project Cost: Total Project Authorizations: Total Parcels: $ 36,316,860 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Other $0 $0 Total $5,042,860 $6,183,628 Other $0 $0 Total $4,914,264 $3,774,163 Other $0 $0 $0 Total $1,379,549 $281,541 $34,655,771 155 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004648 Type Work: Resurface & Maintenance Descp:SR 1BU FROM N OF SR 1/CARROLL TO S OF SR 1/HARALSON Length: 4.74 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,125,960 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $900,768 State $225,192 Other $0 Total $1,125,960 Also in Haralson County Project: M004837 Type Work: Resurface & Maintenance Descp:SR 166 FROM DOUGLAS COUNTY LINE TO SR 61 Phase CST Length: 5.94 Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,037,417 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $829,933 State $207,483 Other $0 Total $1,037,417 Project: M004838 Type Work: Resurface & Maintenance Descp:SR 1/US 27 FROM NS #719232F TO SR 166 Length: 3.25 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 945,263 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $756,210 State $189,053 Other $0 Total $945,263 Project: M004839 Type Work: Resurface & Maintenance Descp:SR 8 FROM HARALSON COUNTY LINE TO DOUGLAS COUNTY LINE Length: 8.34 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,262,804 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,610,243 State $652,561 Other $0 Total $3,262,804 Project: M004870 Type Work: Resurface & Maintenance Descp:SR 100 FROM HEARD COUNTY LINE TO SR 166 Length: 8.93 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,996,368 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,597,095 State $399,274 Other $0 Total $1,996,368 156 STATE TRANSPORTATION IMPROVEMENT PROGRAM Carroll Totals Summary County Summary excludes lump sum projects. Project PI# 0005827 0007640 0010948 631490631490662540- Year 2017 2016 2015 2016 2018 2017 Phase CST CST CST ROW CST ROW Fund NHPP HPP HPP STP STP STP Federal $346,194 $449,950 $251,972 $4,034,288 $4,946,902 $3,931,411 State $86,549 $0 $0 $1,008,572 $1,236,726 $982,853 Other $0 $112,487 $62,993 $0 $0 $0 Total $432,743 $562,437 $314,965 $5,042,860 $6,183,628 $4,914,264 $13,960,718 $3,314,699 $175,480 $17,450,897 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 157 STATE TRANSPORTATION IMPROVEMENT PROGRAM Charlton Project: 0000820 Type Work: Widening Descp:SR 40 FM E OF ST MARYS RIVER TRIB TO E OF CR 66/COLERAIN RD Lanes: Exist. 2 Prop. 4 Length: 11.47 Total Project Cost: Total Project Authorizations: Total Parcels: $ 33,408,629 $0 64 Phase ROW ROW CST UTL Fund HPP HPP NHPP NHPP Year Federal 2016 $1,812,278 2016 $711,507 After 2018 $23,920,474 After 2018 $282,645 State $453,069 $177,877 $5,980,119 $70,661 Other $0 $0 $0 $0 Total $2,265,347 $889,383 $29,900,593 $353,306 Project Details: Widen from 2 to 4 lanes-improve operation and mobility-enhance economic development-on GRIP corridor Also in Camden County Project: 0000821 Type Work: Widening Descp:SR 40 FM SR 40 CONN TO 0.36 MI EAST OF CR 82/MAY BLUFF ROAD Lanes: Exist. 2 Prop. 4 Length: 1.65 Phase ROW CST UTL Fund NHPP NHPP NHPP Year 2016 2017 2017 Federal $231,208 $5,322,622 $127,190 State $57,802 $1,330,655 $31,798 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,101,274 $0 23 Project Details: Widen from 2 to 5 lanes-improve operation and mobility-enhance economic development-on GRIP corridor Project: 0007163 Type Work: Replace Bridge Descp:SR 252 @ SATILLA RIVER OVERFLOWS 10 MI NORTHEAST OF FOLKSON Length: 0.85 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,420,948 $0 0 Phase PE CST Fund STP STP Year 2016 2016 Federal $8,000 $2,728,759 State $2,000 $682,190 Other $0 $0 $0 Other $0 $0 Total $289,009 $6,653,277 $158,988 Total $10,000 $3,410,948 Project: 0007666 Type Work: Drainage Improvements Descp:SR 4 FM BAY ST TO MAIN ST & SR 23 FM MAGNOLIA ST TO MAIN ST Length: 0.86 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,339,758 $ 810,000 15 Phase ROW CST Fund NHPP NHPP Year 2014 2016 Federal $648,000 $1,223,807 State $162,000 $305,952 Other $0 $0 Total $810,000 $1,529,758 Project: 570943- Type Work: Replace Bridge Descp:CR 60 @ HATCHERS BRANCH 1 MI W OF FOLKSTON Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $81,600 $0 $408,000 $8,160 State $20,400 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $102,000 $10,824 $510,000 $10,200 158 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004086 Type Work: Bridges Descp:SR 4/US 1 @ SR 23/US 301 - BEAM REPAIR Length: 0.40 Phase CST Fund STP Year LUMP Federal $48,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 60,000 $0 0 Project Details: Maintenance project-improves safety-on GRIP corridor-on State Freight corridor Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 State $12,000 Other $0 Total $60,000 Project: M004629 Type Work: Resurface & Maintenance Descp:SR 4 @ 1 LOC & SR 4 SO @ 1 LOC Length: 1.71 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 799,228 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $639,383 State $159,846 Other $0 Total $799,228 Project: M005127 Type Work: Resurface & Maintenance Descp:SR 4 FROM FLORIDA STATE LINE TO S OF CS 449/EULA STREET Length: 3.60 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,495,800 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,196,640 State $299,160 Other $0 Total $1,495,800 Charlton Totals Summary County Summary excludes lump sum projects. Project PI# 0000820 0000820 0000821 0000821 0000821 0007163 0007163 0007666 570943- Year 2016 2016 2016 2017 2017 2016 2016 2016 2016 Phase ROW ROW ROW CST UTL PE CST CST ROW Fund HPP HPP NHPP NHPP NHPP STP STP NHPP Local Federal $92,496 $235,596 $231,208 $5,322,622 $127,190 $8,000 $2,728,759 $1,223,807 $0 State $23,124 $58,899 $57,802 $1,330,655 $31,798 $2,000 $682,190 $305,952 $0 Other $0 $0 $0 $0 $0 $0 $0 $0 $10,824 Total $115,620 $294,495 $289,009 $6,653,277 $158,988 $10,000 $3,410,948 $1,529,758 $10,824 $9,969,677 $2,492,419 $10,824 $12,472,920 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 159 STATE TRANSPORTATION IMPROVEMENT PROGRAM Chattooga Project: 0003081 Type Work: Replace Bridge Descp:CR 321/TALIAFERRO SPRINGS @ CHATTOOGA RIVER 1 MI S OF LYERLY Length: 0.61 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,196,777 $0 8 Phase PE ROW CST UTL Fund STP Local STP Local Year 2015 2014 2016 2016 Federal $20,000 $0 $2,235,773 $0 State $5,000 $0 $558,943 $0 Other $0 $324,000 $0 $53,060 Total $25,000 $324,000 $2,794,716 $53,060 Project: 0005530 Type Work: Replace Bridge Descp:SR 48 @ EAST FORK LITTLE RIVER 3.7 MI NE OF MENLO Length: 0.41 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,222,743 $ 35,244 11 Phase PE ROW CST UTL Fund Bridge STP STP STP Year 2014 2015 2016 2016 Federal $28,195 $330,480 $1,964,721 $254,798 State $7,049 $82,620 $491,180 $63,700 Other $0 $0 $0 $0 Total $35,244 $413,100 $2,455,901 $318,498 Project: 0010702 Type Work: TE-Bike/Ped Facility Descp:CS 588/WASHINGTON STREET FM SR 1 TO CS 590/UNIVERSITY STREET Length: 0.13 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 625,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $500,000 State $0 Other $125,000 Total $625,000 Project: 621082- Type Work: Widening Descp:SR 1 FROM CR 329 TO N OF CR 325 @ SR 1/US 27 Lanes: Exist. 2 Prop. 4 Length: 8.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 106,710,424 $ 100,000 85 Phase PE ROW CST UTL Fund NHS NHPP NHPP NHPP Year 2014 2016 2018 2018 Federal $80,000 $10,697,809 $64,593,259 $9,997,272 State $20,000 $2,674,452 $16,148,315 $2,499,318 Project Details: Provide additional capacity - improve mobility and reduce congestion - enhance economic development - reduce crash frequency - State Freight Network Other $0 $0 $0 $0 Total $100,000 $13,372,261 $80,741,574 $12,496,589 160 STATE TRANSPORTATION IMPROVEMENT PROGRAM Chattooga Totals Summary County Summary excludes lump sum projects. Project PI# 0003081 0003081 0003081 0005530 0005530 0005530 621082621082621082- Year 2015 2016 2016 2015 2016 2016 2016 2018 2018 Phase PE CST UTL ROW CST UTL ROW CST UTL Fund STP STP Local STP STP STP NHPP NHPP NHPP Federal $20,000 $2,235,773 $0 $330,480 $1,964,721 $254,798 $10,697,809 $64,593,259 $9,997,272 State $5,000 $558,943 $0 $82,620 $491,180 $63,700 $2,674,452 $16,148,315 $2,499,318 Other $0 $0 $53,060 $0 $0 $0 $0 $0 $0 Total $25,000 $2,794,716 $53,060 $413,100 $2,455,901 $318,498 $13,372,261 $80,741,574 $12,496,589 $90,094,111 $22,523,528 $53,060 $112,670,700 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 161 STATE TRANSPORTATION IMPROVEMENT PROGRAM Clay Project: M005077 Type Work: Resurface & Maintenance Descp:SR 1 FM S OF MILL POND RD/CLAY TO CARNEGIE BILULAH/RANDOLPH Length: 7.67 Phase CST Fund NHPP Year LUMP Total Project Cost: $0 Total Project Authorizations: $0 Total Parcels: 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $0 State $0 Other $0 Total $0 Also in Randolph County Project: M005206 Type Work: Resurface & Maintenance Descp:SR 37 FROM SR 1 TO BAKER COUNTY LINE Length: 27.54 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,901,614 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,321,291 State $580,323 Other $0 Total $2,901,614 Also in Calhoun County Project: M005219 Type Work: Resurface & Maintenance Descp:SR 39 FROM EARLY COUNTY LINE TO SR 37 Length: 9.25 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,686,717 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,949,374 State $737,343 Other $0 Total $3,686,717 162 STATE TRANSPORTATION IMPROVEMENT PROGRAM Clinch Project: 422120- Type Work: Widening Descp:SR 38/US 84 FROM W OF WOODYARD CREEK TO W OF GREASY BRANCH Lanes: Exist. 2 Prop. 4 Length: 11.60 Phase PE CST UTL Fund NHPP NHPP NHPP Year 2015 2015 2015 Federal $3,680,000 $44,391,370 $785,298 State $920,000 $11,097,843 $196,325 Other $0 $0 $0 Total $4,600,000 $55,489,213 $981,623 Total Project Cost: Total Project Authorizations: Total Parcels: $ 61,070,835 $0 114 Project Details: widen from 2 to 4 lanes- new alignment will bypass Argyle on north side- bridges will be replaced-improve mobility and reduce congestion-enhance economic development- reduce crash frequency-GRIP-State Freight Corridor Also in Ware County Project: M004769 Type Work: Bridges Descp:SR 38 @ WOODY CREEK & @ LITTLE SUWANNEE CREEK - BRIDGE REHAB Length: 0.80 Phase PE CST Fund STP STP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 150,000 $0 0 Project Details: Maintenance- improve safety Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Federal $40,000 $80,000 State $10,000 $20,000 Other $0 $0 Total $50,000 $100,000 Project: M005048 Type Work: Resurface & Maintenance Descp:SR 89 FROM HOMERVILLE TO ATKINSON COUNTY LINE Length: 9.99 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,531,561 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,225,249 State $306,312 Other $0 Total $1,531,561 Clinch Totals Summary County Summary excludes lump sum projects. Project PI# 422120422120422120- Year 2015 2015 2015 Phase PE CST UTL Fund NHPP NHPP NHPP Federal $2,392,000 $28,854,391 $510,444 State $598,000 $7,213,598 $127,611 Other $0 $0 $0 Total $2,990,000 $36,067,988 $638,055 $31,756,834 $7,939,209 $0 $39,696,043 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 163 STATE TRANSPORTATION IMPROVEMENT PROGRAM Coffee Project: 0007164 Type Work: Replace Bridge Descp:SR 64 @ 17 MILE RIVER 12 MI NE OF PEARSON Length: 0.37 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,274,345 $ 120,000 5 Phase ROW CST UTL Fund Bridge STP STP Year 2014 2015 2015 Federal $96,000 $3,316,565 $6,912 State $24,000 $829,141 $1,728 Other $0 $0 $0 Total $120,000 $4,145,706 $8,639 Project: 0007165 Type Work: Replace Bridge Descp:SR 158 @ SATILLA RIVER 12 MI WEST OF DOUGLAS Length: 0.39 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,012,212 $0 4 Phase ROW CST Fund STP STP Year 2015 2016 Federal $97,920 $2,311,850 State $24,480 $577,962 Other $0 $0 Total $122,400 $2,889,812 Project: 0010407 Type Work: Replace Bridge Descp:SR 32 @ BEAR CREEK APPROX 4 MI SE OF AMBROSE Length: 0.19 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,789,082 $ 120,000 4 Phase ROW CST Fund NHPP NHPP Year 2014 2016 Federal $96,000 $2,135,265 State $24,000 $533,816 Other $0 $0 Total $120,000 $2,669,082 Project: 0010408 Type Work: Replace Bridge Descp:SR 32 @ HURRICANE CREEK APPROX 0.4 MI W OF NICHOLLS Length: 0.30 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,399,055 $ 110,000 4 Phase ROW CST Fund Bridge NHPP Year 2014 2016 Federal $88,000 $1,831,244 State $22,000 $457,811 Other $0 $0 Total $110,000 $2,289,055 Project: 0010583 Type Work: TE-Bike/Ped Facility Descp:SR 268 FROM CR 141/MAGNOLIA STREET TO CR 142/CYPRESS AVE Length: 0.22 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 187,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $150,000 State $0 Other $37,500 Total $187,500 164 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0011678 Type Work: Replace Bridge Descp:SR 32 @ 17 MILE RIVER APPROX 3 MI E OF DOUGLAS Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,753,771 $0 0 Phase ROW CST UTL Fund NHPP NHPP NHPP Year 2016 2018 2018 Federal $127,345 $2,031,509 $44,163 State $31,836 $507,877 $11,041 Other $0 $0 $0 Total $159,181 $2,539,386 $55,204 Project: 0011679 Type Work: Replace Bridge Descp:SR 32 @ OTTER CREEK APPROX 5 MI E OF DOUGLAS Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,760,098 $0 0 Phase ROW CST UTL Fund NHPP NHPP NHPP Year 2016 2018 2018 Federal $127,345 $1,236,571 $44,163 State $31,836 $309,143 $11,041 Other $0 $0 $0 Total $159,181 $1,545,713 $55,204 Project: 0011680 Type Work: Replace Bridge Descp:SR 32 @ BEAR CREEK APPROX 1.2 MI W OF NICHOLS Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,539,282 $0 0 Phase ROW CST UTL Fund NHPP NHPP NHPP Year 2016 2018 2018 Federal $127,345 $1,059,918 $44,163 State $31,836 $264,979 $11,041 Other $0 $0 $0 Total $159,181 $1,324,897 $55,204 Project: 0011770 Type Work: RRX Warning Device Descp:CR 296/MITCHELL ROAD @ CSX #638224N Length: 0.40 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 268,590 $ 18,590 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $18,590 $250,000 State $0 $0 Other $0 $0 Project: 0011771 Type Work: RRX Warning Device Descp:CR 16/MITCHELL ROAD @ CSX #6378191D Length: 0.20 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 275,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $25,000 $250,000 State $0 $0 Other $0 $0 Total $18,590 $250,000 Total $25,000 $250,000 165 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012745 Type Work: Preliminary Engineering Descp:CR 100/CHANEY ROAD @ CSX #638223G Length: 0.40 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 368,590 $ 18,590 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $18,590 $350,000 State $0 $0 Other $0 $0 Total $18,590 $350,000 Project: 0012837 Type Work: RRX Warning Device Descp:CR 145/PALMETTO ROAD @ CSX #638228R Length: 0.40 Phase PE CST Fund STP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 266,890 $ 16,890 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $16,890 $250,000 State $0 $0 Other $0 $0 Total $16,890 $250,000 Project: 421345- Type Work: Widening Descp:SR 32 FM W OF CR 296 EAST TO WEST CITY LIMITS OF DOUGLAS Lanes: Exist. 2 Prop. 4 Length: 4.20 Phase ROW CST UTL Fund NHPP NHPP NHPP Year Federal 2015 $3,674,454 After 2018 $16,948,452 After 2018 $1,413,559 State $918,614 $4,237,113 $353,390 Total Project Cost: Total Project Authorizations: Total Parcels: $ 27,545,581 $0 112 Project Details: widen from 2 to 4 lanes- improve mobility, reduce congestion- enhance economic development -reduce crash frequency- GRIP Other $0 $0 $0 Total $4,593,068 $21,185,565 $1,766,949 Project: 431830- Type Work: Widening Descp:SR 135 FM SR 31/US 441 EAST TO SR 32 INCLUDING RR SEPARATION Lanes: Exist. 2 Prop. 4 Length: 2.76 Phase CST UTL Fund NHPP NHPP Year 2016 2016 Federal $19,895,687 $418,820 State $4,973,922 $104,705 Total Project Cost: Total Project Authorizations: Total Parcels: $ 25,393,134 $0 108 Project Details: widen from 2 to 4 lanes- improve mobility, reduce congestion- enhance economic development -reduce crash frequency- GRIP Other $0 $0 Total $24,869,609 $523,525 Project: M004860 Type Work: Resurface & Maintenance Descp:SR 206 FROM N OF BROXTON HWY/BEN HILL TO N OF SR 32/COFFEE Length: 16.35 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,722,636 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,378,109 State $344,527 Other $0 Total $1,722,636 Also in Ben Hill, Irwin County 166 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005006 Type Work: Resurface & Maintenance Descp:SR 158 FROM SR 206 TO SR 31 Length: 1.41 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 321,872 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $257,498 State $64,374 Other $0 Total $321,872 Project: M005209 Type Work: Resurface & Maintenance Descp:SR 32 FROM SR 125 TO DOUGLAS CITY LIMITS Length: 35.02 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 286,758 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $229,406 State $57,352 Other $0 Total $286,758 Also in Irwin County Coffee Totals Summary County Summary excludes lump sum projects. Project PI# 0007164 0007164 0007165 0007165 0010407 0010408 0011678 0011678 0011678 0011679 0011679 0011679 0011680 0011680 0011680 421345431830431830- Year 2015 2015 2015 2016 2016 2016 2016 2018 2018 2016 2018 2018 2016 2018 2018 2015 2016 2016 Phase CST UTL ROW CST CST CST ROW CST UTL ROW CST UTL ROW CST UTL ROW CST UTL Fund STP STP STP STP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP Federal $3,316,565 $6,912 $97,920 $2,311,850 $2,135,265 $1,831,244 $127,345 $2,031,509 $44,163 $127,345 $1,236,571 $44,163 $127,345 $1,059,918 $44,163 $3,674,454 $19,895,687 $418,820 State $829,141 $1,728 $24,480 $577,962 $533,816 $457,811 $31,836 $507,877 $11,041 $31,836 $309,143 $11,041 $31,836 $264,979 $11,041 $918,614 $4,973,922 $104,705 Other $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $4,145,706 $8,639 $122,400 $2,889,812 $2,669,082 $2,289,055 $159,181 $2,539,386 $55,204 $159,181 $1,545,713 $55,204 $159,181 $1,324,897 $55,204 $4,593,068 $24,869,609 $523,525 $38,531,238 $9,632,810 $0 $48,164,048 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 167 STATE TRANSPORTATION IMPROVEMENT PROGRAM Colquitt Project: 0000520 Type Work: Widening Descp:SR 133 FM S OF SR 35/US 319 TO N OF COLQUITT COUNTY LINE Lanes: Exist. 2 Prop. 4 Length: 13.87 Total Project Cost: Total Project Authorizations: Total Parcels: $ 75,835,689 $ 161,000 166 Phase PE ROW CST UTL Fund NHPP NHPP NHPP NHPP Year 2014 2017 After 2018 After 2018 Federal $128,800 $10,214,764 $49,365,088 $959,900 State $32,200 $2,553,691 $12,341,272 $239,975 Other $0 $0 $0 $0 Total $161,000 $12,768,455 $61,706,360 $1,199,875 Project Details: widen from 2 to 4 lanes- turn lanes added at intersections- improve mobility-reduce congestion-enhance economic development- reduce crash frequency- GRIP Also in Worth County Project: 0000545 Type Work: Widening Descp:SR 133 FM CR 1/OLD QUITMAN ADEL RD/BROOKS TO CR 256/COLQUITT Lanes: Exist. 2 Prop. 4 Length: 9.63 Phase PE CST UTL Fund NHPP NHPP NHPP Year 2014 2016 2016 Federal $1,072,800 $23,623,347 $355,504 State $268,200 $5,905,837 $88,876 Other $0 $0 $0 Total $1,341,000 $29,529,183 $444,380 Total Project Cost: Total Project Authorizations: Total Parcels: $ 31,314,563 $ 1,341,000 105 Project Details: widen from 2 to 4 lanes- turn lanes added as needed- improve mobility-reduce congestion-enhance economic development- reduce crash frequency- GRIP Also in Brooks County Project: 0000546 Type Work: Widening Descp:SR 133 FROM CR 256/OLD BERLIN ROAD TO CR 388/HAWTHORNE DRIVE Lanes: Exist. 2 Prop. 4 Length: 7.86 Phase PE CST UTL Fund NHPP NHPP NHPP Year 2014 2016 2016 Federal $250,400 $20,946,052 $298,197 State $62,600 $5,236,513 $74,549 Total Project Cost: Total Project Authorizations: Total Parcels: $ 26,868,311 $ 313,000 100 Project Details: widen from 2 to 4 lanes- inclusion of turn lanes as needed- improve mobility-reduce congestion-enhance economic development- reduce crash frequency- GRIP Project: 0007479 Type Work: RRX Warning Device Descp:CR 494/FUNSTON-DOERUN ROAD @ GFRR #723300L Length: 0.02 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 171,062 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $7,030 $164,032 State $0 $0 Other $0 $0 $0 Total $313,000 $26,182,565 $372,746 Other $0 $0 Total $7,030 $164,032 168 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009846 Type Work: Roundabout Descp:SR 33/US 319 @ SR 33 SO Length: 0.27 Phase ROW CST UTL Fund HSIP HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,896,246 $ 490,000 12 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year 2014 LUMP LUMP Federal $490,000 $2,376,388 $29,857 State $0 $0 $0 Other $0 $0 $0 Total $490,000 $2,376,388 $29,857 Project: 0009855 Type Work: Roundabout Descp:SR 37 @ CR 238/INDUSTRIAL DRIVE/CR 477/COOL SPRINGS ROAD Length: 0.25 Phase ROW CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 992,000 $0 8 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $142,000 $850,000 State $0 $0 Other $0 $0 Total $142,000 $850,000 Project: 0010558 Type Work: Sidewalks Descp:C A GRAY JUNIOR HIGH SCHOOL - SRTS Length: 0.42 Phase CST Fund Safety Year LUMP Federal $114,780 Total Project Cost: Total Project Authorizations: Total Parcels: $ 114,780 $0 0 Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL ANY PROJECTS FOR FY 2015 - FY 2018 State $0 Other $0 Total $114,780 Project: 0010849 Type Work: Intersection Improvement Descp:SR 35/US 319 @ CR 89 INDIAN LAKE DRIVE Length: 0.50 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,229,487 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $1,106,538 State $122,949 Other $0 Total $1,229,487 Project: 0010855 Type Work: Signals Descp:SR 35 @ 5 LOC; SR 38 @ 3 LOC &SR 133 @ 1 LOC-SIGNAL UPGRADES Length: 3.60 Phase ROW CST Fund STP STP Year LUMP LUMP Federal $156,000 $1,283,050 State $0 $0 Other $0 $0 Total $156,000 $1,283,050 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,439,050 $0 3 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Also in Brooks County 169 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004898 Type Work: Resurface & Maintenance Descp:SR 133 FROM BROOKS COUNTY LINE TO SR 35 Length: 14.60 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,371,457 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $4,297,166 State $1,074,291 Other $0 Total $5,371,457 Project: M004981 Type Work: Resurface & Maintenance Descp:SR 35 FROM SR 33 TO SR 33 Length: 7.10 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,647,486 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,317,989 State $329,497 Other $0 Total $1,647,486 Project: M005049 Type Work: Resurface & Maintenance Descp:SR 37 FROM MITCHELL COUNTY LINE TO SR 111 Length: 12.50 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,317,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,053,600 State $263,400 Other $0 Total $1,317,000 Project: M005104 Type Work: Resurface & Maintenance Descp:SR 33 FROM SR 35 TO SR 133 Length: 8.40 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,378,131 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $3,502,505 State $875,626 Other $0 Total $4,378,131 Project: M005207 Type Work: Resurface & Maintenance Descp:SR 133 FROM SR 33 TO WORTH COUNTY LINE Length: 11.28 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,285,453 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,628,362 State $657,091 Other $0 Total $3,285,453 170 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005208 Type Work: Resurface & Maintenance Descp:SR 111 FROM MITCHELL COUNTY LINE TO SR 33 SO Length: 15.50 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,449,620 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,959,696 State $489,924 Other $0 Total $2,449,620 Colquitt Totals Summary County Summary excludes lump sum projects. Project PI# 0000520 0000545 0000545 0000546 0000546 Year 2017 2016 2016 2016 2016 Phase ROW CST UTL CST UTL Fund NHPP NHPP NHPP NHPP NHPP Federal $9,908,321 $5,433,370 $81,766 $20,946,052 $298,197 State $2,477,080 $1,358,342 $20,441 $5,236,513 $74,549 Other $0 $0 $0 $0 $0 Total $12,385,401 $6,791,712 $102,207 $26,182,565 $372,746 $36,667,705 $9,166,926 $0 $45,834,632 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 171 STATE TRANSPORTATION IMPROVEMENT PROGRAM Columbia Project: 0011733 Type Work: TE-Bike/Ped Facility Descp:SR 47 FROM SR 10 TO CS 513/SOUTH HICKS STREET IN HARLEM Length: 0.09 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $200,000 State $0 Other $50,000 Total $250,000 Project: M004706 Type Work: Resurface & Maintenance Descp:SR 223 FROM MCDUFFIE COUNTY LINE TO W OF CS 696/CREEKSIDE DR Length: 11.74 Phase CST Fund STP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,943,099 $ 1,943,099 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,554,479 State $388,620 Other $0 Total $1,943,099 Project: M004979 Type Work: Resurface & Maintenance Descp:SR 47 FROM LINCOLN COUNTY LINE TO I-20 Length: 16.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,844,692 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,275,754 State $568,938 Other $0 Total $2,844,692 Project: M005196 Type Work: Resurface & Maintenance Descp:I-20 FROM SR 10/MCDUFFIE TO SR 383/COLUMBIA Length: 21.84 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 20,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $18,000 State $2,000 Other $0 Total $20,000 Also in McDuffie County 172 STATE TRANSPORTATION IMPROVEMENT PROGRAM Cook Project: 0010585 Type Work: TE-Bike/Ped Facility Descp:SR 7 FROM CS 666/7TH STREET TO CS 733/EAST ROGERS STREET Length: 0.53 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 312,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $250,000 State $0 Other $62,500 Total $312,500 173 STATE TRANSPORTATION IMPROVEMENT PROGRAM Crawford Project: 0011681 Type Work: Replace Bridge Descp:SR 22 @ BAILEY BRANCH 8 MI W OF ROBERTA Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,430,016 $0 5 Phase ROW CST UTL Fund STP STP STP Year 2016 2017 2017 Federal $242,205 $855,318 $46,489 State $60,551 $213,830 $11,622 Other $0 $0 $0 Total $302,756 $1,069,148 $58,112 Project: M005137 Type Work: Resurface & Maintenance Descp:SR 22 FROM SR 7 TO BIBB COUNTY LINE Length: 10.64 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,428,881 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,943,105 State $485,776 Other $0 Total $2,428,881 Crawford Totals Summary County Summary excludes lump sum projects. Project PI# 0011681 0011681 0011681 Year 2016 2017 2017 Phase ROW CST UTL Fund STP STP STP Federal $242,205 $855,318 $46,489 State $60,551 $213,830 $11,622 Other $0 $0 $0 Total $302,756 $1,069,148 $58,112 $1,144,013 $286,003 $0 $1,430,016 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 174 STATE TRANSPORTATION IMPROVEMENT PROGRAM Crisp Project: 0000481 Type Work: Widening Descp:SR 30/SR 90 FROM 4 LN @ I-75 TO MIDWAY RD IN CORDELE Lanes: Exist. 3 Prop. 5 Length: 0.25 Phase ROW CST UTL Fund NHPP NHPP NHPP Year 2015 2017 2017 Federal $909,942 $1,442,016 $41,925 State $227,486 $360,504 $10,481 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,992,354 $0 10 Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help enhance economic development and will reduce crash frequency. Project: 0010598 Type Work: TE-Bike/Ped Facility Descp:CR 1/PATEVILLE RD; CR 468/10TH ST & CS 624/25TH AVE @ 3 LOCS Length: 0.68 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 25 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $400,000 State $0 Other $0 $0 $0 Other $100,000 Total $1,137,428 $1,802,519 $52,407 Total $500,000 Project: 0011747 Type Work: TE-Bike/Ped Facility Descp:CS 688/PECAN ST FM SR 30/SR 90 TO CS 655/8TH AVE IN CORDELE Length: 0.63 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 12 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $200,000 State $0 Other $50,000 Total $250,000 Project: M004803 Type Work: Resurface & Maintenance Descp:SR 300 FROM S OF CR 29/OLD CONLEY ROAD TO S OF SR 300 CONN Length: 5.60 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,150,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,720,000 State $430,000 Other $0 Total $2,150,000 175 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004805 Type Work: Resurface & Maintenance Descp:I-75 FROM SR 159/TURNER TO N OF CR 355/OLD HATLEY RD/CRISP Length: 14.37 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 50,000 $0 0 Project Details: On Freight/GRIP Network Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $45,000 State $5,000 Other $0 Total $50,000 Also in Turner County Project: M005068 Type Work: Resurface & Maintenance Descp:SR 7 FROM CS 579/CATO ROAD TO DOOLY COUNTY LINE Length: 5.68 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 526,800 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $421,440 State $105,360 Other $0 Total $526,800 Crisp Totals Summary County Summary excludes lump sum projects. Project PI# 0000481 0000481 0000481 Year 2015 2017 2017 Phase ROW CST UTL Fund NHPP NHPP NHPP Federal $909,942 $1,442,016 $41,925 State $227,486 $360,504 $10,481 Other $0 $0 $0 Total $1,137,428 $1,802,519 $52,407 $2,393,883 $598,471 $0 $2,992,354 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 176 STATE TRANSPORTATION IMPROVEMENT PROGRAM Dade Project: 0009021 Type Work: TE-Bike/Ped Facility Descp:TRENTON DOWNTOWN STREETSCAPING Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 360,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $288,400 State $0 Other $72,100 Total $360,500 Project: 0010114 Type Work: Lighting Descp:I-59 @ SR 136 INTERCHANGE - LIGHTING Length: 0.40 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 620,826 $0 0 Project Details: In Freight/GRIP Network. Uses Lump Sum Bank: INTERCHANGE/ROADWAY LIGHTING FOR FY 2015 - FY 2018 Federal $558,743 State $62,083 Other $0 Total $620,826 Project: 0010448 Type Work: Signals Descp:SR 1 @ 3 LOC; SR 2 @ 4 LOC; SR 136 @ 3 LOC &SR 146 @ 2 LOC Length: 4.80 Phase ROW CST UTL Fund STP STP STP Year LUMP LUMP LUMP Federal $985,000 $1,595,238 $395,000 State $0 $0 $0 Other $0 $0 $0 Total $985,000 $1,595,238 $395,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,975,238 $0 26 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Also in Catoosa, Walker County Project: M004513 Type Work: Signing Descp:I-59 @ 4 LOCS - SIGN UPGRADES Length: 1.60 Phase PE CST Fund NHPP NHPP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 980,919 $0 0 Project Details: In Freight/GRIP Network Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $10,000 $970,919 State $0 $0 Other $0 $0 Total $10,000 $970,919 177 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004514 Type Work: Signing Descp:I-24 @ I-59 & @ SR 299 - SIGN UPGRADES Length: 0.80 Phase PE CST Fund NHPP NHPP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,158,781 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $10,000 $1,148,781 State $0 $0 Other $0 $0 Total $10,000 $1,148,781 Project: M004874 Type Work: Resurface & Maintenance Descp:SR 58 FM N OF CR 101/CEDAR LANE TO N OF CS 601/SCENIC DRIVE Length: 2.40 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 531,847 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $425,477 State $106,369 Other $0 Total $531,847 Project: M005061 Type Work: Resurface & Maintenance Descp:SR 136 FROM SR 58 TO WALKER COUNTY LINE Length: 8.62 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,927,065 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,541,652 State $385,413 Other $0 Total $1,927,065 Project: M005109 Type Work: Bridges Descp:I-59 @ 2 LOCS & I-75 @ 4 LOCS Length: 2.40 Phase PE CST Fund NHPP NHPP Year 2014 LUMP Federal $20,970 $1,485,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,673,300 $ 23,300 0 Project Details: Painting bridge superstructure - on State Freight Network Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $2,330 $165,000 Other $0 $0 Total $23,300 $1,650,000 Also in Bartow, Gordon County 178 STATE TRANSPORTATION IMPROVEMENT PROGRAM Dawson Project: 0000315 Type Work: Intersection Improvement Descp:SR 52 RELOCATION @ SR 183 EXTENSION / MP 3.7 TO 5.3 Lanes: Exist. 0 Prop. 4 Length: 1.60 Phase PE ROW CST Fund NHPP NHPP NHPP Year 2014 2018 After 2018 Federal $391,912 $269,174 $3,846,171 State $97,978 $67,293 $961,543 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,634,071 $ 489,889 0 Project Details: Intersection safety improvements- Intersection capacity & operational improvements- enhanced mobility Project: 0007030 Type Work: Replace Bridge Descp:SR 9 @ ETOWAH RIVER Length: 0.50 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,486,544 $ 190,000 6 Phase PE ROW CST UTL Fund STP Bridge STP STP Year 2015 2014 2015 2015 Federal $8,000 $152,000 $1,790,771 $838,464 State $2,000 $38,000 $447,693 $209,616 Other $0 $0 $0 Other $0 $0 $0 $0 Total $489,889 $336,467 $4,807,714 Total $10,000 $190,000 $2,238,464 $1,048,080 Project: 0007169 Type Work: Replace Bridge Descp:SR 136 @ ETOWAH RIVER 5.7 MI EAST OF DAWSONVILLE Length: 0.32 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,958,785 $0 5 Phase PE ROW CST Fund STP STP STP Year 2015 2015 2017 Federal $8,000 $143,616 $1,415,412 State $2,000 $35,904 $353,853 Other $0 $0 $0 Total $10,000 $179,520 $1,769,265 Project: 0009022 Type Work: TE-Bike/Ped Facility Descp:DAWSON COUNTY COMMUNITY CULTURAL TRAILWAY - PHASE I Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 482,241 $0 5 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $385,793 State $0 Other $96,448 Total $482,241 Project: 0009938 Type Work: Roundabout Descp:SR 53 @ SR 183 Length: 0.56 Phase ROW CST UTL Fund HSIP HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,420,520 $0 18 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP LUMP Federal $876,017 $1,525,776 $18,727 State $0 $0 $0 Other $0 $0 $0 Total $876,017 $1,525,776 $18,727 179 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 132790- Type Work: Intersection Improvement Descp:SR 400 @ SR 53/CORR A1 Length: 1.37 Phase CST UTL Fund App Dev Local Year 2015 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 9,677,008 $0 16 Project Details: Intersection capacity & operational improvements- enhanced mobility Federal $9,147,908 $0 State $0 $0 Other $0 $529,100 Total $9,147,908 $529,100 Project: M004697 Type Work: Bridges Descp:SR 136 @ SHOAL CREEK & @ BURT CREEK & SR 56 @ OPEN CREEK Length: 1.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 0 Project Details: Maintenance- improve safety along SR 136 Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Federal $200,000 State $50,000 Other $0 Total $250,000 Also in Emanuel County Dawson Totals Summary County Summary excludes lump sum projects. Project PI# 0000315 0007030 0007030 0007030 0007169 0007169 0007169 132790132790- Year 2018 2015 2015 2015 2015 2015 2017 2015 2015 Phase ROW PE CST UTL PE ROW CST CST UTL Fund NHPP STP STP STP STP STP STP App Dev Local Federal $269,174 $8,000 $1,790,771 $838,464 $8,000 $143,616 $1,415,412 $9,147,908 $0 State $67,293 $2,000 $447,693 $209,616 $2,000 $35,904 $353,853 $0 $0 Other $0 $0 $0 $0 $0 $0 $0 $0 $529,100 Total $336,467 $10,000 $2,238,464 $1,048,080 $10,000 $179,520 $1,769,265 $9,147,908 $529,100 $13,621,346 $1,118,359 $529,100 $15,268,805 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 180 STATE TRANSPORTATION IMPROVEMENT PROGRAM Decatur Project: 0007171 Type Work: Replace Bridge Descp:SR 97 @ BIG SLOUGH 3.2 MI NORTHEAST OF BAINBRIDGE Length: 0.45 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,186,554 $0 7 Phase ROW CST UTL Fund STP STP STP Year 2015 2016 2016 Federal $195,840 $2,306,876 $46,527 State $48,960 $576,719 $11,632 Other $0 $0 $0 Total $244,800 $2,883,596 $58,158 Project: 0010599 Type Work: TE-Bike/Ped Facility Descp:CS 617/W WATER ST @ 1 LOC & CS 618/W BROUGHTON ST @ 1 LOC Length: 0.56 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 812,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $650,000 State $0 Other $162,500 Total $812,500 Project: 0010926 Type Work: Intersection Improvement Descp:SR 38BU/US 84BU @ SR 38/US 84 Length: 0.40 Phase CST Fund HSIP Year LUMP Federal $550,800 State $61,200 Total Project Cost: Total Project Authorizations: Total Parcels: $ 612,000 $0 0 Project Details: Intersection reconstruction Improve operation reduce vehicular and pedestrian crash frequency and severity Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Other $0 Total $612,000 Project: 0011683 Type Work: Replace Bridge Descp:SR 253 @ SPRING CREEK 12 MI SW OF BAINBRIDGE Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,201,731 $0 4 Phase ROW CST UTL Fund STP STP STP Year 2016 2018 2018 Federal $127,345 $1,589,876 $44,163 State $31,836 $397,469 $11,041 Other $0 $0 $0 Total $159,181 $1,987,345 $55,204 Project: M004389 Type Work: Resurface & Maintenance Descp:SR 1BU FROM SR 38BU TO SR 97 Length: 0.82 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 138,605 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $110,884 State $27,721 Other $0 Total $138,605 181 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004895 Type Work: Resurface & Maintenance Descp:SR 1/US 27 FROM SR 38 TO SR 38 Length: 3.20 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,067,658 $0 0 Project Details: On Freight/GRIP Network Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $854,126 State $213,532 Other $0 Total $1,067,658 Project: M005026 Type Work: Resurface & Maintenance Descp:SR 309 FROM SR 97 TO SR 262 Length: 7.34 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 27,613 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $22,090 State $5,523 Other $0 Total $27,613 Project: M005083 Type Work: Resurface & Maintenance Descp:SR 1 FROM 1 MI S OF CR 193/JOHNNY SKIPPER ROAD TO SR 38 Length: 2.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 484,656 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $387,725 State $96,931 Other $0 Total $484,656 Project: M005105 Type Work: Bridges Descp:SR 1 SB & NB @ FLINT RIVER Length: 0.80 Phase PE CST Fund STP STP Year 2014 LUMP Federal $160,000 $2,880,000 State $40,000 $720,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,800,000 $ 200,000 0 Project Details: Rehab bridge deck, joint replacement, and zone painting on State Freight Network on GRIP Network Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Other $0 $0 Total $200,000 $3,600,000 182 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005165 Type Work: Resurface & Maintenance Descp:SR 38BU/US 84BU FROM CSX #637632V TO FRONTAGE ROAD Length: 1.63 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 493,743 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $394,994 State $98,749 Other $0 Total $493,743 Decatur Totals Summary County Summary excludes lump sum projects. Project PI# 0007171 0007171 0007171 0011683 0011683 0011683 Year 2015 2016 2016 2016 2018 2018 Phase ROW CST UTL ROW CST UTL Fund STP STP STP STP STP STP Federal $195,840 $2,306,876 $46,527 $127,345 $1,589,876 $44,163 State $48,960 $576,719 $11,632 $31,836 $397,469 $11,041 Other $0 $0 $0 $0 $0 $0 Total $244,800 $2,883,596 $58,158 $159,181 $1,987,345 $55,204 $4,310,628 $1,077,657 $0 $5,388,285 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 183 STATE TRANSPORTATION IMPROVEMENT PROGRAM Dodge Project: 0013079 Type Work: RRX Consolidation Descp:CS 692 @ CSX #635214X/DODGE & CS 729 @ CSX #635213R/TELFAIR Length: 0.42 Phase CST Fund HSIP Year LUMP Federal $240,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 240,000 $0 0 Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018 State $0 Other $0 Total $240,000 Also in Telfair County Project: 222410- Type Work: Widening Descp:SR 87/US 23 FM LOG CABIN/DODGE TO S OF SR 257/BLECKLEY-TIA Lanes: Exist. 2 Prop. 4 Length: 9.50 Total Project Cost: Total Project Authorizations: Total Parcels: $ 31,613,029 $ 6,906,751 220 Phase PE CST CST UTL Fund STP State STP Local Year 2014 2014 2017 2017 Federal $120,000 $0 $19,178,027 $0 State $30,000 $0 $4,794,507 $0 Other $0 $6,756,751 $0 $733,745 Total $150,000 $6,756,751 $23,972,534 $733,745 Project Details: Widen from 2 to 4 lanes - provide additional capacity to improve mobility and reduce congestion - enhance economic development and will reduce crash frequency on SR 87 in Dodge and Bleckley county. Also in Bleckley County Project: M004939 Type Work: Resurface & Maintenance Descp:SR 27BU FROM SR 27 TO SR 27 Length: 3.89 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,222,463 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $977,970 State $244,493 Other $0 Total $1,222,463 Project: M004966 Type Work: Resurface & Maintenance Descp:SR 87 FROM SR 27 TO 0.04 MI S OF CR 499/TANNER DRIVE Length: 4.50 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 573,331 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $458,665 State $114,666 Other $0 Total $573,331 184 STATE TRANSPORTATION IMPROVEMENT PROGRAM Dodge Totals Summary County Summary excludes lump sum projects. Project PI# Year Phase Fund Federal State Other Total 222410222410- 2017 CST 2017 UTL STP Local $16,109,543 $0 $4,027,386 $0 $0 $616,346 $20,136,928 $616,346 $16,109,543 $4,027,386 $616,346 $20,753,274 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 185 STATE TRANSPORTATION IMPROVEMENT PROGRAM Dooly Project: 0005320 Type Work: Interchange Descp:I-75 @ SR 215 Length: 1.89 Total Project Cost: Total Project Authorizations: Total Parcels: $ 18,633,032 $ 4,600,000 28 Phase PE ROW CST UTL Fund NHS NHPP NHPP NHPP Year 2014 2014 2015 2015 Federal $640,000 $3,040,000 $10,060,433 $1,165,992 State $160,000 $760,000 $2,515,108 $291,498 Project Details: Add a center turn lane to bridge-improve operation and mobility-reduce crash frequency Other $0 $0 $0 $0 Total $800,000 $3,800,000 $12,575,542 $1,457,490 Project: 0007172 Type Work: Replace Bridge Descp:SR 230 @ TURKEY CREEK S OF BYROMVILLE Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,291,056 $ 100,000 3 Phase PE ROW CST Fund STP STP STP Year 2015 2014 2016 Federal $40,000 $80,000 $912,845 State $10,000 $20,000 $228,211 Other $0 $0 $0 Total $50,000 $100,000 $1,141,056 Project: 0010600 Type Work: TE-Bike/Ped Facility Descp:SR 7 @ 2 LOCS & CS 741/COTTON STREET @ 1 LOC IN VIENNA Length: 0.28 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 293,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $234,400 State $0 Other $58,600 Project: 0010601 Type Work: TE-Bike/Ped Facility Descp:SR 7 @ 1 LOC; SR 230 @ 1 LOC & CS 533/THIRD STREET @ 1 LOC Length: 0.27 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 625,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $500,000 State $0 Other $125,000 Total $293,000 Total $625,000 186 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 311665- Type Work: Interchange Descp:I-75 @ SR 27 - WIDEN BRIDGE & RAMPS Length: 0.70 Phase PE CST UTL Fund NHPP NHPP NHPP Year 2014 2015 2015 Federal $40,000 $14,455,260 $988,118 State $10,000 $3,613,815 $247,030 Total Project Cost: Total Project Authorizations: Total Parcels: $ 19,354,222 $ 50,000 21 Project Details: Reconstruct interchange ramps and add turn bays-improve operation and mobility-reduce crash frequency Other $0 $0 $0 Total $50,000 $18,069,075 $1,235,148 Project: M004974 Type Work: Resurface & Maintenance Descp:SR 329 FROM SR 26/MACON TO SR 230/DOOLY Length: 9.45 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 829,727 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $663,782 State $165,945 Other $0 Total $829,727 Also in Macon County Project: M004990 Type Work: Resurface & Maintenance Descp:SR 230 FROM SR 230 CONN TO SR 27 Length: 10.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,664,725 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,331,780 State $332,945 Other $0 Total $1,664,725 Project: M005155 Type Work: Resurface & Maintenance Descp:SR 257 FROM CRISP COUNTY LINE TO SR 215 Length: 3.65 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 384,564 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $307,651 State $76,913 Other $0 Total $384,564 187 STATE TRANSPORTATION IMPROVEMENT PROGRAM Dooly Totals Summary County Summary excludes lump sum projects. Project PI# 0005320 0005320 0007172 0007172 311665311665- Year 2015 2015 2015 2016 2015 2015 Phase CST UTL PE CST CST UTL Fund NHPP NHPP STP STP NHPP NHPP Federal $10,060,433 $1,165,992 $40,000 $912,845 $14,455,260 $988,118 State $2,515,108 $291,498 $10,000 $228,211 $3,613,815 $247,030 Other $0 $0 $0 $0 $0 $0 Total $12,575,542 $1,457,490 $50,000 $1,141,056 $18,069,075 $1,235,148 $27,622,648 $6,905,662 $0 $34,528,310 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 188 STATE TRANSPORTATION IMPROVEMENT PROGRAM Early Project: 0006112 Type Work: RRX Warning Device Descp:CS 630/ARLINGTON AVE @ NS #733632H Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 185,239 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $185,239 State $0 Other $0 Total $185,239 Project: 0009036 Type Work: TE-Bike/Ped Facility Descp:BLAKELY GATEWAY PROJECT Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,000,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $800,000 State $0 Other $200,000 Total $1,000,000 Project: 0013150 Type Work: Signing Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 7 LOCS IN EARLY COUNTY Length: 23.89 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 92,429 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $92,429 State $0 Other $0 Total $92,429 Project: M005094 Type Work: Resurface & Maintenance Descp:SR 45 FROM MILLER COUNTY LINE TO CALHOUN COUNTY LINE Length: 12.97 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,277,509 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,822,007 State $455,502 Other $0 Total $2,277,509 189 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005223 Type Work: Resurface & Maintenance Descp:SR 273 SPUR FROM GEORGIA PACIFIC PAPER MILL TO SR 370 Length: 0.75 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 137,966 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $110,373 State $27,593 Other $0 Total $137,966 190 STATE TRANSPORTATION IMPROVEMENT PROGRAM Echols Project: M004801 Type Work: Resurface & Maintenance Descp:SR 7 FROM FLORIDA STATE LINE TO NSR Length: 5.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,100,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $880,000 State $220,000 Other $0 Total $1,100,000 Also in Lowndes County Project: M005095 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 94/ECHOLS COUNTY TO SR 38/LANIER COUNTY Length: 16.56 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,046,278 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,437,022 State $609,256 Other $0 Total $3,046,278 Also in Lanier County 191 STATE TRANSPORTATION IMPROVEMENT PROGRAM Effingham Project: 0004913 Type Work: Widening Descp:SR 119 FROM USHER ROAD TO SR 21 FOR CENTER TURN LANE Lanes: Exist. 2 Prop. 3 Length: 3.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,140,828 $ 50,000 31 Phase PE ROW CST UTL Fund STP STP STP STP Year 2014 2016 After 2018 After 2018 Federal $40,000 $394,520 $2,772,151 $105,992 State $10,000 $98,630 $693,038 $26,498 Project Details: widen from 2 to 3 lane- addition of a center turn lane and related improvements- improve operation and mobility- reduce crash frequency-on 2 State Bicycle Routes-locals/consultant pursuing scaled back version of project Other $0 $0 $0 $0 Total $50,000 $493,150 $3,465,189 $132,490 Project: 0006700 Type Work: New Construction Descp:EFFINGHAM PKWY FROM SR 119/EFFINGHAM TO SR 30/CHATHAM Lanes: Exist. 0 Prop. 4 Length: 14.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 100,691,462 $0 94 Phase PE ROW CST UTL Fund STP Local STP Local Year Federal After 2018 $87,768 2017 $0 After 2018 $58,619,068 After 2018 $0 State $21,942 $0 $14,654,767 $0 Other $0 $26,112,084 $0 $1,195,834 Total $109,710 $26,112,084 $73,273,835 $1,195,834 Project Details: new 0-4 lanes roadway- enhance mobility and connectivity-enhance economic development Also in Chatham County Project: 0009437 Type Work: RRX Surface Rehab/Recst Descp:CR 115/INDIGO ROAD @ CSX #635134E Length: 0.40 Phase CST Fund HSIP Year LUMP Federal $79,591 Total Project Cost: Total Project Authorizations: Total Parcels: $ 79,591 $0 0 Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018 State $0 Other $0 Total $79,591 Project: 0009870 Type Work: Roundabout Descp:SR 17 @ SR 119 Length: 0.50 Phase ROW CST UTL Fund HSIP HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,948,268 $0 10 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP LUMP Federal $251,777 $1,612,342 $84,150 State $0 $0 $0 Other $0 $0 $0 Total $251,777 $1,612,342 $84,150 192 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009872 Type Work: Roundabout Descp:SR 275 @ CR 307/RINCON-STILL ROAD Length: 0.40 Phase ROW CST Fund Safety Safety Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,034,340 $0 8 Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $150,000 $884,340 State $0 $0 Other $0 $0 Total $150,000 $884,340 Project: 0010434 Type Work: Intersection Improvement Descp:CR 156/BLUE JAY RD/BLANFORD RD @ CR 143/CR 176/MCCALL RD Length: 0.40 Phase PE CST Fund Safety Safety Year LUMP LUMP Federal $225,000 $589,500 State $25,000 $65,500 Total Project Cost: Total Project Authorizations: Total Parcels: $ 905,000 $0 0 Project Details: Intersection improvement- improve the capacity and operations to enhance mobility- increase safety Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018 Other $0 $0 Total $250,000 $655,000 Project: 0010869 Type Work: TE-Bike/Ped Facility Descp:SR 21BU FROM CS 610/1ST STREET TO SR 119 IN SPRINGFIELD Length: 0.19 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $300,000 State $0 Other $75,000 Total $375,000 Project: M004630 Type Work: Resurface & Maintenance Descp:SR 21 FROM 0.20 MI N OF NS #916917C TO JACKS BRANCH Length: 6.64 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,352,428 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $5,081,942 State $1,270,486 Other $0 Total $6,352,428 193 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005055 Type Work: Resurface & Maintenance Descp:SR 119 FROM CS 616/CRAWFORD ST TO CR 104/PRIESTER RD Length: 7.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,642,600 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,114,080 State $528,520 Other $0 Total $2,642,600 Project: M005183 Type Work: Resurface & Maintenance Descp:SR 17 FROM SR 30 TO CS 555/SAMUEL SMALLS SENIOR AVE Length: 10.06 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,958,362 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,566,690 State $391,672 Other $0 Total $1,958,362 Effingham Totals Summary County Summary excludes lump sum projects. Project PI# 0004913 0006700 Year 2016 2017 Phase ROW ROW Fund STP Local Federal $394,520 $0 State $98,630 $0 Other $0 $24,023,117 Total $493,150 $24,023,117 $394,520 $98,630 $24,023,117 $24,516,267 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 194 STATE TRANSPORTATION IMPROVEMENT PROGRAM Elbert Project: 0009863 Type Work: Replace Bridge Descp:SR 368 @ PICKENS CREEK Length: 0.25 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,320,298 $ 160,000 6 Phase ROW CST UTL Fund STP STP STP Year 2014 2015 2015 Federal $128,000 $855,206 $73,032 State $32,000 $213,802 $18,258 Other $0 $0 $0 Total $160,000 $1,069,008 $91,290 Project: 122650- Type Work: Widening Descp:SR 72 FM WEST CITY LIMITS OF COMER TO E OF BROAD RVR/ELBERT Lanes: Exist. 2 Prop. 4 Length: 9.33 Phase PE CST CST Fund NHPP NHPP Bond Year 2015 2015 2015 Federal $104,000 $1,079,729 $0 State $26,000 $269,932 $55,573,560 Other $0 $0 $0 Total $130,000 $1,349,661 $55,573,560 Total Project Cost: Total Project Authorizations: Total Parcels: $ 57,053,221 $ 56,923,221 0 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development - Project on GRIP corridor & State Freight Network Also in Madison County Project: M004845 Type Work: Resurface & Maintenance Descp:SR 72 FROM MADISON COUNTY LINE TO SR 17 Length: 8.10 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,817,301 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $3,853,841 State $963,460 Other $0 Total $4,817,301 Project: M004996 Type Work: Bridges Descp:SR 28; SR 52; SR 72 & SR 77 @ 4 LOCS - SCOUR REPAIR & REHAB Length: 1.20 Phase PE CST Fund STP STP Year 2014 LUMP Federal $360,000 $1,680,000 State $90,000 $420,000 Other $0 $0 Total $450,000 $2,100,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,550,000 $ 450,000 0 Project Details: Painting steel superstructure - deck rehab - correct broken welds - joint replacement - spall repairs on State Freight Network on GRIP network Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Also in Hart, Lumpkin, Rabun County 195 STATE TRANSPORTATION IMPROVEMENT PROGRAM Elbert Totals Summary County Summary excludes lump sum projects. Project PI# 0009863 0009863 122650122650122650- Year 2015 2015 2015 2015 2015 Phase CST UTL PE CST CST Fund STP STP NHPP Bond NHPP Federal $855,206 $73,032 $2,080 $0 $21,595 State $213,802 $18,258 $520 $1,111,471 $5,399 Other $0 $0 $0 $0 $0 Total $1,069,008 $91,290 $2,600 $1,111,471 $26,993 $951,913 $1,349,449 $0 $2,301,362 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 196 STATE TRANSPORTATION IMPROVEMENT PROGRAM Emanuel Project: 0006109 Type Work: RRX Warning Device Descp:CS 818/COLEMAN STREET @ OGE #732673J Length: 0.20 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 161,338 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $161,338 State $0 Other $0 Project: 0006516 Type Work: RRX Warning Device Descp:CS 893/GREENE STREET @ G&F #732671V Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 191,215 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $191,215 State $0 Other $0 Project: 0006517 Type Work: RRX Warning Device Descp:CS 814/PINE STREET @ NS/OGE #732680U Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 179,264 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $179,264 State $0 Other $0 Project: 0009917 Type Work: Roundabout Descp:SR 4/US 1 @ SR 57 Length: 0.12 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,104,081 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $165,612 $938,469 State $0 $0 Other $0 $0 Total $161,338 Total $191,215 Total $179,264 Total $165,612 $938,469 197 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0010718 Type Work: TE-Bike/Ped Facility Descp:SWAINSBORO DOWNTOWN STREETSCAPE IMPROVEMENTS @ 5 LOCS Length: 0.74 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 668,260 $0 16 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $534,608 State $0 Other $133,652 Total $668,260 Project: 0013257 Type Work: Pedestrian Crossings Descp:SR 4BU; SR 23; SR 26 & SR 46 @ 5 LOCS PEDESTRIAN UPGRADES Length: 2.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 795,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $153,000 $562,500 State $17,000 $62,500 Other $0 $0 Total $170,000 $625,000 Also in Treutlen County Project: 222630- Type Work: Widening Descp:SR 4BU/US 1BU FM SWAINSBORO BYPASS N TO CR 382/INJUNCTION RD Lanes: Exist. 2 Prop. 5 Length: 1.96 Phase PE CST Fund NHPP NHPP Year 2014 2015 Federal $112,000 $4,781,024 State $28,000 $1,195,256 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,116,280 $ 140,000 52 Project Details: Widen 2 to 5 lanes - provide additional capacity to improve mobility and reduce congestion- enhance economic development and reduce crash frequency on SR 4/US 1 in Emanuel County on the statewide freight network. Other $0 $0 Total $140,000 $5,976,280 Project: M003880 Type Work: Bridges Descp:I-16 @ 1 LOC; I-285 @ 4 LOCS - STEEL BEAM REPAIR Length: 2.00 Phase PE CST Fund NHPP NHPP Year LUMP LUMP Federal $24,842 $104,336 Total Project Cost: Total Project Authorizations: Total Parcels: $ 143,531 $0 0 Project Details: Maintenance- improve safety along I-16- on the statewide freight network Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $2,760 $11,593 Other $0 $0 Total $27,602 $115,928 Also in DeKalb, Fulton County 198 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004189 Type Work: Signing Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,700,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,700,000 Project: M004697 Type Work: Bridges Descp:SR 136 @ SHOAL CREEK & @ BURT CREEK & SR 56 @ OPEN CREEK Length: 1.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 0 Project Details: Maintenance- improve safety along SR 136 Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Federal $200,000 State $0 Other $0 Total $1,700,000 Also in Bleckley, Laurens, Treutlen County State $50,000 Other $0 Total $250,000 Also in Dawson County Project: M005131 Type Work: Resurface & Maintenance Descp:SR 171 FROM SR 56/TREUTLEN TO SR 26/EMANUEL Length: 6.81 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,148,312 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $918,650 State $229,662 Other $0 Total $1,148,312 Also in Treutlen County Project: M005186 Type Work: Resurface & Maintenance Descp:SR 57 FROM JOHNSON COUNTY LINE TO SR 4 Length: 8.50 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,044,805 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $835,844 State $208,961 Other $0 Total $1,044,805 Emanuel Totals Summary County Summary excludes lump sum projects. Project PI# 222630- Year 2015 Phase CST Fund NHPP Federal $4,781,024 State $1,195,256 Other $0 Total $5,976,280 $4,781,024 $1,195,256 $0 $5,976,280 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 199 STATE TRANSPORTATION IMPROVEMENT PROGRAM Evans Project: 0008297 Type Work: Replace Bridge Descp:CR 77/DAVID TIPPINS ROAD @ BULL CREEK 5 MI E OF CLAXTON Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $81,600 $0 $408,000 $8,160 State $20,400 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $102,000 $10,824 $510,000 $10,200 Project: M005080 Type Work: Resurface & Maintenance Descp:SR 73 FROM CLAXTON CITY LIMITS TO STATESBORO CITY LIMITS Length: 8.55 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,078,831 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,463,065 State $615,766 Other $0 Total $3,078,831 Also in Bulloch County Evans Totals Summary County Summary excludes lump sum projects. Project PI# 0008297 Year 2016 Phase ROW Fund Local Federal $0 State $0 Other $10,824 Total $10,824 $0 $0 $10,824 $10,824 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 200 STATE TRANSPORTATION IMPROVEMENT PROGRAM Fannin Project: 0007456 Type Work: Pedestrian Crossings Descp:SR 2 @ 2 LOC; SR 3 @ 9 LOC; SR 5 @ 1 LOC IN BARTOW & FANNIN Length: 4.80 Phase ROW CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 585,830 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $158,174 $369,073 State $17,575 $41,008 Other $0 $0 Total $175,749 $410,081 Also in Bartow County Project: 0010677 Type Work: TE-Bike/Ped Facility Descp:CS 548/EAST MAIN ST FM CS 571/DEPOT ST TO CS 592/MOUNTAIN ST Length: 0.26 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 468,750 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $375,000 State $0 Other $93,750 Total $468,750 Project: 0013110 Type Work: Signals Descp:SR 52 @ 1 LOC; SR 53BU @ 2 LOCS & SR 515 @ 1 LOC Length: 1.60 Phase PE ROW CST Fund STP STP STP Year LUMP LUMP LUMP Federal $100,000 $80,000 $312,000 State $25,000 $20,000 $78,000 Other $0 $0 $0 Total $125,000 $100,000 $390,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 615,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Also in Gilmer, Pickens County Project: 620490- Type Work: New Construction Descp:SR 771 FM SR 5 NEAR CR 18 S/MCCAYSVILLE TO TENN STATE LINE Lanes: Exist. 0 Prop. 5 Length: 2.05 Phase ROW CST Fund STP STP Year 2018 After 2018 Federal $396,800 $5,554,400 State $99,200 $1,388,600 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,439,000 $0 31 Project Details: Project will improve mobility and connectivity within the transportation network. Project will also enhance economic development opportunities locally and within the region. Other $0 $0 Total $496,000 $6,943,000 201 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 621340- Type Work: Widening Descp:SR 5 FM SR 2/BLUE RIDGE N TO PROP MCCAYSVILLE BYP NR CR 138 Lanes: Exist. 2 Prop. 5 Length: 8.00 Phase ROW CST Fund App Dev App Dev Year Federal 2018 $13,327,000 After 2018 $28,637,000 State $0 $0 Total Project Cost: Total Project Authorizations: Total Parcels: $ 41,964,000 $0 145 Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help enhance economic development and will reduce crash frequency. Project: M003371 Type Work: Miscellaneous Improvements Descp:SR 60 @ 2 LOCS BTWN CR 5 & CR 244 EMERGENCY SLOPE REPAIR Length: 0.80 Phase ROW CST Fund STP STP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 209,775 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $30,914 $136,906 State $7,729 $34,227 Other $0 $0 Total $13,327,000 $28,637,000 Other $0 $0 Total $38,643 $171,133 Fannin Totals Summary County Summary excludes lump sum projects. Project PI# Year Phase Fund Federal State Other Total 620490621340- 2018 2018 ROW ROW STP App Dev $396,800 $13,327,000 $99,200 $0 $0 $496,000 $0 $13,327,000 $13,723,800 $99,200 $0 $13,823,000 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 202 STATE TRANSPORTATION IMPROVEMENT PROGRAM Franklin Project: 0010691 Type Work: TE-Bike/Ped Facility Descp:LAVONIA DOWNTOWN STREETSCAPE ENHANCEMENT @ 5 LOCS - PHASE II Length: 0.39 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $200,000 State $0 Other $50,000 Total $250,000 Project: 0010695 Type Work: TE-Bike/Ped Facility Descp:CS 815/RAILROAD ST @ 1 LOC & CS 830/CS 858/BOWERS ST @ 1 LOC Length: 0.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 437,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $350,000 State $0 Other $87,500 Total $437,500 Project: M004808 Type Work: Resurface & Maintenance Descp:I-85 FROM N OF SR 63/BANKS TO 0.50 MI S OF SR 17/FRANKLIN Length: 17.77 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 50,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $45,000 State $5,000 Other $0 Total $50,000 Also in Banks County Project: M004849 Type Work: Resurface & Maintenance Descp:SR 17 FROM N OF CR 108/CLARKS CREEK RD TO STEPHENS CO LINE Length: 0.76 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 147,362 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $117,890 State $29,472 Other $0 Total $147,362 203 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005174 Type Work: Resurface & Maintenance Descp:SR 17 FROM SR 17BU/HART TO SR 17BU/FRANKLIN Length: 2.47 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 710,792 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $568,634 State $142,158 Other $0 Total $710,792 Also in Hart County Project: M005200 Type Work: Resurface & Maintenance Descp:SR 106 FROM SR 59/FRANKLIN TO SR 63/STEPHENS Length: 9.90 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,469,105 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,975,284 State $493,821 Other $0 Total $2,469,105 Also in Stephens County Project: M005227 Type Work: Bridges Descp:I-85 @ 9 LOCS & I-985 @ 6 LOCS - BRIDGE PRESERVATION Length: 0.00 Phase PE CST Fund IM NHPP Year 2014 LUMP Federal $40,500 $1,376,779 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,574,754 $ 45,000 0 Project Details: Painting steel superstructure on State Freight Network Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $4,500 $152,975 Other $0 $0 Total $45,000 $1,529,754 Also in Gwinnett, Hall, Jackson County 204 STATE TRANSPORTATION IMPROVEMENT PROGRAM Gilmer Project: 0006612 Type Work: TE-Bike/Ped Facility Descp:ELLIJAY STREETSCAPE FM SR 282 TO SPRING STREET - PHASE III Length: 1.50 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 20 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $300,000 State $0 Other $75,000 Total $375,000 Project: 0013110 Type Work: Signals Descp:SR 52 @ 1 LOC; SR 53BU @ 2 LOCS & SR 515 @ 1 LOC Length: 1.60 Phase PE ROW CST Fund STP STP STP Year LUMP LUMP LUMP Federal $100,000 $80,000 $312,000 State $25,000 $20,000 $78,000 Other $0 $0 $0 Total $125,000 $100,000 $390,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 615,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Also in Fannin, Pickens County Project: 631260- Type Work: New Construction Descp:SR 382 EXT FM CR 239 TO SR 5/SR 515 NEW APD CORRIDOR Lanes: Exist. 0 Prop. 2 Length: 0.79 Phase ROW CST UTL Fund STP STP STP Year 2017 2018 2018 Federal $2,701,411 $3,719,794 $600,100 State $675,353 $929,948 $150,025 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,776,631 $0 5 Project Details: Project will improve mobility and connectivity within the transportation network. Project will also enhance economic development opportunities locally and within the region. Project: M003646 Type Work: Shoulder Work Descp:SR 282 FROM COURIER STREET TO CR 239/MAIN STREET Length: 0.22 Phase Fund CST Emergency Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $5,600 State $1,400 Other $0 $0 $0 Other $0 Total $3,376,764 $4,649,742 $750,125 Total $7,000 205 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005184 Type Work: Resurface & Maintenance Descp:SR 282 FM MURRAY COUNTY LINE TO E OF CR 17/OLD TAILS CRK RD Length: 10.10 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,975,636 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,580,509 State $395,127 Other $0 Total $1,975,636 Gilmer Totals Summary County Summary excludes lump sum projects. Project PI# 631260631260631260- Year 2017 2018 2018 Phase ROW CST UTL Fund STP STP STP Federal $2,701,411 $3,719,794 $600,100 State $675,353 $929,948 $150,025 Other $0 $0 $0 Total $3,376,764 $4,649,742 $750,125 $7,021,305 $1,755,326 $0 $8,776,631 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 206 STATE TRANSPORTATION IMPROVEMENT PROGRAM Glascock Project: 270710- Type Work: Replace Bridge Descp:CR 50 @ JOES CREEK SW OF GIBSON Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $300,000 $10,824 $510,000 $10,200 Glascock Totals Summary County Summary excludes lump sum projects. Project PI# 270710- Year 2016 Phase ROW Fund Local Federal $0 State $0 Other $10,824 Total $10,824 $0 $0 $10,824 $10,824 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 207 STATE TRANSPORTATION IMPROVEMENT PROGRAM Gordon Project: 0006416 Type Work: Realignment Descp:SR 53 FM E OF CR 269/RYO MOUNTAIN RD TO W OF CR 178/DAVIS RD Length: 1.50 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,985,881 $0 28 Phase PE ROW CST UTL Fund HSIP HSIP HSIP HSIP Year LUMP LUMP LUMP LUMP Federal $35,100 $2,952,000 $8,161,303 $538,889 State $3,900 $328,000 $906,811 $59,877 Other $0 $0 $0 $0 Total $39,000 $3,280,000 $9,068,115 $598,766 Project Details: Realignment bring horizontal and vertical curves up to current standards add shoulders decrease frequency of crashes Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Also in Pickens County Project: 0010409 Type Work: Replace Bridge Descp:SR 3 @ LYNN CREEK 5 MI S OF CALHOUN Length: 0.30 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,041,271 $0 11 Phase ROW CST UTL Fund STP STP STP Year 2016 2017 2017 Federal $88,326 $576,595 $168,095 State $22,082 $144,149 $42,024 Other $0 $0 $0 Total $110,408 $720,744 $210,119 Project: 0010410 Type Work: Replace Bridge Descp:SR 156 @ CSX #340683F 2 MI N OF RANGER Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,989,311 $0 7 Phase ROW CST UTL Fund STP STP STP Year 2016 2017 2017 Federal $88,326 $2,082,391 $220,731 State $22,082 $520,598 $55,183 Other $0 $0 $0 Total $110,408 $2,602,989 $275,914 Project: 0010708 Type Work: TE-Bike/Ped Facility Descp:SR 3 FROM CS 746/HICKS STREET TO CS 738/PIEDMONT STREET Length: 0.33 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $400,000 State $0 Other $100,000 Total $500,000 208 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 662510- Type Work: New Construction Descp:SOUTH CALHOUN BYPASS FM SR 53 @ CR 13 EAST TO SR 53 @ CR 64 Lanes: Exist. 0 Prop. 4 Length: 6.80 Phase CST UTL Fund STP STP Year 2017 2017 Total Project Cost: Total Project Authorizations: Total Parcels: $ 33,823,138 $0 35 Project Details: Will improve mobility and connectivity - enhance economic development Federal $25,493,046 $1,565,464 State $6,373,261 $391,366 Other $0 $0 Total $31,866,307 $1,956,831 Project: M005109 Type Work: Bridges Descp:I-59 @ 2 LOCS & I-75 @ 4 LOCS Length: 2.40 Phase PE CST Fund NHPP NHPP Year 2014 LUMP Federal $20,970 $1,485,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,673,300 $ 23,300 0 Project Details: Painting bridge superstructure - on State Freight Network Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $2,330 $165,000 Other $0 $0 Total $23,300 $1,650,000 Also in Bartow, Dade County Project: M005222 Type Work: Resurface & Maintenance Descp:SR 136 FROM SR 61 TO MURRAY COUNTY LINE Length: 0.47 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 91,936 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $73,548 State $18,387 Other $0 Total $91,936 Gordon Totals Summary County Summary excludes lump sum projects. Project PI# 0010409 0010409 0010409 0010410 0010410 0010410 662510662510- Year 2016 2017 2017 2016 2017 2017 2017 2017 Phase ROW CST UTL ROW CST UTL CST UTL Fund STP STP STP STP STP STP STP STP Federal $88,326 $576,595 $168,095 $88,326 $2,082,391 $220,731 $25,493,046 $1,565,464 State $22,082 $144,149 $42,024 $22,082 $520,598 $55,183 $6,373,261 $391,366 Other $0 $0 $0 $0 $0 $0 $0 $0 Total $110,408 $720,744 $210,119 $110,408 $2,602,989 $275,914 $31,866,307 $1,956,831 $30,282,976 $7,570,744 $0 $37,853,720 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 209 STATE TRANSPORTATION IMPROVEMENT PROGRAM Grady Project: 0010602 Type Work: TE-Bike/Ped Facility Descp:BROAD STREET FROM CSX #636831U TO CS 551/2ND AVE SE Length: 0.13 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 875,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $700,000 State $0 Other $175,000 Total $875,000 Project: 0012887 Type Work: Replace Bridge Descp:SR 112 @ SAPP CREEK Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,200,000 $ 200,000 0 Phase PE CST Fund Bridge STP Year 2014 2016 Federal $160,000 $1,600,000 State $40,000 $400,000 Other $0 $0 Total $200,000 $2,000,000 Project: M004432 Type Work: Bridge Painting Descp:SR 93 @ LITTLE TIRED CREEK TRIB & SR 195 @ MUCKALEE CREEK Length: 0.80 Phase PE CST Fund STP STP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 204,000 $0 0 Project Details: Bridge painting and remove lead based paint system Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Federal $3,200 $160,000 State $800 $40,000 Other $0 $0 Total $4,000 $200,000 Also in Lee County Project: M004802 Type Work: Resurface & Maintenance Descp:SR 112 FROM SR 38 TO MITCHELL COUNTY LINE Length: 12.90 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,150,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,520,000 State $630,000 Other $0 Total $3,150,000 210 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005035 Type Work: Resurface & Maintenance Descp:SR 38 FM E OF UPPER HAWTHORNE TRAIL TO E OF PIERCE CHAPEL RD Length: 8.10 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,158,960 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $927,168 State $231,792 Other $0 Total $1,158,960 Project: M005057 Type Work: Resurface & Maintenance Descp:SR 93 FROM SR 111 TO SR 38 Length: 1.00 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 210,720 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $168,576 State $42,144 Other $0 Total $210,720 Project: M005141 Type Work: Resurface & Maintenance Descp:SR 111/SR 188 FROM SR 38 TO SR 93 Length: 0.80 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 193,159 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $154,527 State $38,632 Other $0 Total $193,159 Grady Totals Summary County Summary excludes lump sum projects. Project PI# 0012887 Year 2016 Phase CST Fund STP Federal $1,600,000 State $400,000 Other $0 Total $2,000,000 $1,600,000 $400,000 $0 $2,000,000 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 211 STATE TRANSPORTATION IMPROVEMENT PROGRAM Greene Project: 0006605 Type Work: TE-Bike/Ped Facility Descp:GREENSBORO STREETSCAPE PLAN - PHASE III Length: 1.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 750,000 $0 18 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $600,000 State $0 Other $150,000 Total $750,000 Project: 0013259 Type Work: Pedestrian Crossings Descp:SR 12; SR 15; SR 24 BYP; SR 36 &SR 162 @5 LOC - PED UPGRADES Length: 2.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 795,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Project: 270683- Type Work: Replace Bridge Descp:CR 25/COPELAND ROAD @ GREENBRIER CREEK SW OF PENFIELD Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $153,000 $562,500 State $17,000 $62,500 Other $0 $0 Total $170,000 $625,000 Federal $81,600 $0 $408,000 $8,160 Also in Morgan, Newton, Taliaferro County State $20,400 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $102,000 $10,824 $510,000 $10,200 Project: M004722 Type Work: Bridges Descp:I-20 EB & WB @ RICHLAND CREEK - SCOUR REHAB Length: 0.80 Phase CST Fund NHPP Year LUMP Federal $270,000 State $30,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,000 $0 0 Project Details: Deck preservation painting superstructure spall repair scour countermeasures on State Freight Network Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 Other $0 Total $300,000 212 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004920 Type Work: Resurface & Maintenance Descp:I-20 FROM SR 44/GREENE TO SR10/SR 17/MCDUFFIE Length: 41.95 Phase CST Fund NHPP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,191,045 $ 8,191,045 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Project: M005149 Type Work: Resurface & Maintenance Descp:SR 77 FROM SR 15 TO SR 12 Length: 5.70 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,223,277 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $7,371,941 Federal $978,621 State $819,105 Other $0 Total $8,191,045 Also in McDuffie, Taliaferro, Warren County State $244,655 Other $0 Total $1,223,277 Project: M005197 Type Work: Resurface & Maintenance Descp:I-20 FROM NS #733146T/MORGAN TO SR 44/GREENE Length: 16.84 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 20,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $18,000 State $2,000 Other $0 Total $20,000 Also in Morgan County Greene Totals Summary County Summary excludes lump sum projects. Project PI# 270683- Year 2016 Phase ROW Fund Local Federal $0 State $0 Other $10,824 Total $10,824 $0 $0 $10,824 $10,824 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 213 STATE TRANSPORTATION IMPROVEMENT PROGRAM Habersham Project: 0009945 Type Work: Roundabout Descp:SR 384 @ CR 382/PEA RIDGE ROAD Length: 0.26 Phase ROW CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,520,067 $0 8 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $600,000 $920,067 State $0 $0 Other $0 $0 Total $600,000 $920,067 Project: 0010334 Type Work: Signals Descp:SR 15 @ 2 LOCS; SR 17 @ 1 LOC & SR 105 @ 4 LOCS Length: 2.80 Phase ROW CST UTL Fund STP STP STP Year LUMP LUMP LUMP Federal $302,000 $1,114,694 $49,210 State $0 $0 $0 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,465,904 $0 10 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Other $0 $0 $0 Total $302,000 $1,114,694 $49,210 Project: 0010692 Type Work: TE-Bike/Ped Facility Descp:SR 385 FROM CR 387/MT AIRY HWY TO CS 627/FLORIDA STREET Length: 0.74 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $300,000 State $0 Other $75,000 Total $375,000 Project: 0010693 Type Work: TE-Bike/Ped Facility Descp:CS 879/LEVEL GROVE RD FM CS 878/IRVIN ST TO SR 15/US 411 BYP Length: 0.94 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 14 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $300,000 State $0 Other $75,000 Total $375,000 214 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0012829 Type Work: Operational Improvement Descp:SR 105/US 441 @ SR 15/US 23 Length: 0.40 Phase PE CST Fund STP STP Total Project Cost: Total Project Authorizations: Total Parcels: $ 390,000 $ 150,000 0 Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $120,000 $192,000 State $30,000 $48,000 Other $0 $0 Total $150,000 $240,000 Project: 0013154 Type Work: RRX Warning Device Descp:RAILROAD CROSSING UPGRADES @SEV LOC FM TOCCOA TO OAKWOOD Length: 0.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 505,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Project: 0013237 Type Work: Signing Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 17 LOC IN HABERSHAM COUNTY Length: 0.00 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 335,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $5,000 $500,000 Federal $335,000 State $0 $0 Other $0 $0 Total $5,000 $500,000 Also in Banks, Hall, Stephens County State $0 Other $0 Total $335,000 Project: M003643 Type Work: Drainage Improvements Descp:SR 15/US 441 FROM CR 123/JOHN WOOD RD TO CR 125/TOM BORN RD Length: 2.02 Phase Fund Year CST Emergency LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 43,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $34,400 State $8,600 Other $0 Total $43,000 Project: M005060 Type Work: Resurface & Maintenance Descp:SR 385 FROM SR 105 TO SR 17 Length: 4.56 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,136,808 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $909,446 State $227,362 Other $0 Total $1,136,808 215 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005126 Type Work: Resurface & Maintenance Descp:SR 105 FROM SR 15 TO N OF VISION DRIVE Length: 3.45 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,027,314 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $821,851 State $205,463 Other $0 Total $1,027,314 Project: M005144 Type Work: Resurface & Maintenance Descp:SR 15 CONN FROM W OF SR 365/US 23 TO SR 15 Phase CST Length: 0.71 Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 157,338 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $125,870 State $31,468 Other $0 Total $157,338 216 STATE TRANSPORTATION IMPROVEMENT PROGRAM Hancock Project: 0010411 Type Work: Replace Bridge Descp:SR 16 @ LITTLE SHOULDERBONE CREEK 8.6 MI NW OF SPARTA Length: 0.34 Phase ROW CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,277,620 $0 4 Fund STP STP Year 2015 2017 Federal $96,288 $1,725,808 State $24,072 $431,452 Other $0 $0 Total $120,360 $2,157,260 Project: 0010713 Type Work: TE-Rehab Hist Trans Bldg Descp:HANCOCK COUNTY DEPOT WELCOME CENTER Length: 0.40 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 656,300 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $525,040 State $0 Other $131,260 Total $656,300 Project: 0010719 Type Work: TE-Bike/Ped Facility Descp:SR 15 FROM CR 79/COURT STREET TO SR 16 Length: 0.67 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 625,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $500,000 State $0 Other $125,000 Total $625,000 Project: M004710 Type Work: Resurface & Maintenance Descp:SR 22 FROM BALDWIN COUNTY LINE TO SR 16 Length: 12.45 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,190,845 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,752,676 State $438,169 Other $0 Total $2,190,845 Project: M004967 Type Work: Resurface & Maintenance Descp:SR 15 FROM WASHINGTON COUNTY LINE TO SR 16 Length: 9.40 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,314,209 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,651,367 State $662,842 Other $0 Total $3,314,209 217 STATE TRANSPORTATION IMPROVEMENT PROGRAM Hancock Totals Summary County Summary excludes lump sum projects. Project PI# Year Phase Fund Federal State Other Total 0010411 2015 ROW STP 0010411 2017 CST STP $96,288 $1,725,808 $24,072 $431,452 $0 $120,360 $0 $2,157,260 $1,822,096 $455,524 $0 $2,277,620 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 218 STATE TRANSPORTATION IMPROVEMENT PROGRAM Haralson Project: 0000761 Type Work: Intersection Improvement Descp:SR 100 FM SR 8 TO SR 120 IN TALLAPOOSA&DRAINAGE IMPROVEMENTS Length: 0.85 Phase ROW CST Fund STP STP Year 2018 After 2018 Federal $31,667 $1,149,587 State $7,917 $287,397 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,476,568 $0 0 Project Details: Intersection safety improvements- Intersection capacity & operational improvements- enhanced mobility Project: 0009089 Type Work: TE-Bike/Ped Facility Descp:TALLAPOOSA STREETSCAPE - PHASE III Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 531,250 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $425,000 State $0 Other $0 $0 Other $106,250 Total $39,584 $1,436,983 Total $531,250 Project: 0009864 Type Work: Replace Bridge Descp:SR 120 @ BEACH CREEK E OF TALLAPOOSA Length: 0.30 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,008,803 $0 2 Phase ROW CST UTL Fund STP STP STP Year 2015 2016 2016 Federal $97,920 $3,845,949 $63,173 State $24,480 $961,487 $15,793 Other $0 $0 $0 Total $122,400 $4,807,437 $78,966 Project: 0009901 Type Work: Roundabout Descp:I-20 @ SR 348/WACO ROAD - EB & WB RAMPS Length: 0.43 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,876,937 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $220,816 $1,656,121 State $0 $0 Other $0 $0 Total $220,816 $1,656,121 Project: 0013048 Type Work: RRX Warning Device Descp:CR 279/JOHN ALLEN ROAD @ NS #726681M Length: 0.20 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 255,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $5,000 $250,000 State $0 $0 Other $0 $0 Total $5,000 $250,000 219 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013088 Type Work: RRX Warning Device Descp:CR 91/NITRA ROAD @ NS #726699X Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 260,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $260,000 State $0 Other $0 Total $260,000 Project: M004648 Type Work: Resurface & Maintenance Descp:SR 1BU FROM N OF SR 1/CARROLL TO S OF SR 1/HARALSON Length: 4.74 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,125,960 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $900,768 State $225,192 Other $0 Total $1,125,960 Also in Carroll County Haralson Totals Summary County Summary excludes lump sum projects. Project PI# 0000761 0009864 0009864 0009864 Year 2018 2015 2016 2016 Phase ROW ROW CST UTL Fund STP STP STP STP Federal $31,667 $97,920 $3,845,949 $63,173 State $7,917 $24,480 $961,487 $15,793 Other $0 $0 $0 $0 Total $39,584 $122,400 $4,807,437 $78,966 $4,038,710 $1,009,678 $0 $5,048,388 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 220 STATE TRANSPORTATION IMPROVEMENT PROGRAM Harris Project: 0007036 Type Work: Replace Bridge Descp:SR 219 @ MOUNTAIN OAK CREEK SOUTH OF WHITESVILLE Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,758,320 $ 519,714 0 Phase PE ROW CST Fund Bridge STP STP Year 2014 2016 2018 Federal $415,771 $54,586 $4,136,299 State $103,943 $13,646 $1,034,075 Other $0 $0 $0 Total $519,714 $68,232 $5,170,374 Project: 0008600 Type Work: Replace Bridge Descp:CR 386/FORTSON ROAD @ STANDING BOY CREEK Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,356,425 $ 727,960 4 Phase PE ROW CST UTL Fund Bridge Local STP STP Year 2014 2016 2018 2018 Federal $582,368 $0 $450,465 $9,009 State $145,592 $0 $112,616 $2,252 Other $0 $54,122 $0 $0 Total $727,960 $54,122 $563,081 $11,262 Project: 0010615 Type Work: TE-Rail to Trail Descp:SR 1 FROM CR 387/D STREET TO SR 18 Length: 4.07 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 640,591 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $512,473 State $0 Other $128,118 Project: 371150- Type Work: Replace Bridge Descp:CR 215/EBENEZER CHURCH RD @ WILLIAMS CREEK SE OF HAMILTON I Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $81,600 $0 $408,000 $8,160 State $20,400 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $640,591 Total $102,000 $10,824 $510,000 $10,200 Project: M004517 Type Work: Signing Descp:I-185 @ 16 LOCS - SIGN UPGRADES Length: 0.00 Phase PE CST Fund NHPP NHPP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,943,886 $0 0 Project Details: In Freight/GRIP Network. Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $80,000 $6,863,886 State $0 $0 Other $0 $0 Total $80,000 $6,863,886 Also in Muscogee, Troup County 221 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005084 Type Work: Resurface & Maintenance Descp:SR 315 FROM SR 219 TO TALBOT COUNTY LINE Length: 24.25 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,938,885 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $3,151,108 State $787,777 Other $0 Total $3,938,885 Project: M005085 Type Work: Resurface & Maintenance Descp:SR 103 FROM SR 219/HARRIS TO SR 18/TROUP Length: 13.96 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,409,566 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,127,653 State $281,913 Other $0 Total $1,409,566 Also in Troup County Project: M005103 Type Work: Resurface & Maintenance Descp:SR 18 FROM E OF I-85 TO HARRIS COUNTY LINE Length: 6.33 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 47,627 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $38,102 State $9,525 Other $0 Total $47,627 Also in Troup County Project: M005156 Type Work: Resurface & Maintenance Descp:SR 219 FROM MUSCOGEE COUNTY LINE TO SR 103/SR 116 Length: 11.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,240,155 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $992,124 State $248,031 Other $0 Total $1,240,155 Project: M005215 Type Work: Resurface & Maintenance Descp:SR 116 FROM SR 1 TO CS 248/O STREET Length: 1.85 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 350,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $280,000 State $70,000 Other $0 Total $350,000 222 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005218 Type Work: Resurface & Maintenance Descp:SR 36 FROM SR 208/HARRIS TO SR 41/TALBOT Length: 10.15 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,857,935 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,486,348 State $371,587 Other $0 Total $1,857,935 Also in Talbot County Harris Totals Summary County Summary excludes lump sum projects. Project PI# 0007036 0007036 0008600 0008600 0008600 371150- Year 2016 2018 2016 2018 2018 2016 Phase ROW CST ROW CST UTL ROW Fund STP STP Local STP STP Local Federal $54,586 $4,136,299 $0 $450,465 $9,009 $0 State $13,646 $1,034,075 $0 $112,616 $2,252 $0 Other $0 $0 $54,122 $0 $0 $10,824 Total $68,232 $5,170,374 $54,122 $563,081 $11,262 $10,824 $4,650,359 $1,162,590 $64,946 $5,877,895 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 223 STATE TRANSPORTATION IMPROVEMENT PROGRAM Hart Project: M004996 Type Work: Bridges Descp:SR 28; SR 52; SR 72 & SR 77 @ 4 LOCS - SCOUR REPAIR & REHAB Length: 1.20 Phase PE CST Fund STP STP Year 2014 LUMP Federal $360,000 $1,680,000 State $90,000 $420,000 Other $0 $0 Total $450,000 $2,100,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,550,000 $ 450,000 0 Project Details: Painting steel superstructure - deck rehab - correct broken welds - joint replacement - spall repairs on State Freight Network on GRIP network Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Also in Elbert, Lumpkin, Rabun County Project: M005000 Type Work: Resurface & Maintenance Descp:SR 8 WE FROM SR 8 TO SR 8 Length: 0.55 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 137,115 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $109,692 State $27,423 Other $0 Total $137,115 Project: M005016 Type Work: Resurface & Maintenance Descp:SR 8 FROM SR 51 TO E OF CR 33/ELIZABETH ROAD Length: 2.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 573,390 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $458,712 State $114,678 Other $0 Total $573,390 Project: M005174 Type Work: Resurface & Maintenance Descp:SR 17 FROM SR 17BU/HART TO SR 17BU/FRANKLIN Length: 2.47 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 710,792 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $568,634 State $142,158 Other $0 Total $710,792 Also in Franklin County 224 STATE TRANSPORTATION IMPROVEMENT PROGRAM Heard Project: M004915 Type Work: Bridges Descp:SR 34 @ CHATTAHOOCHEE RIVER - BRIDGE REHAB & REPAIRS Length: 0.40 Phase PE CST Fund STP STP Year 2014 LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 347,947 $ 147,947 0 Project Details: Fracture critical rehab and repairs Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Federal $118,358 $160,000 State $29,589 $40,000 Other $0 $0 Total $147,947 $200,000 225 STATE TRANSPORTATION IMPROVEMENT PROGRAM Irwin Project: 0000313 Type Work: Widening Descp:SR 107 FROM W OF CR 264/IRWIN TO SR 11/US 129/BEN HILL Lanes: Exist. 2 Prop. 4 Length: 10.45 Phase ROW CST UTL Fund STP STP STP Year Federal 2018 $7,615,508 After 2018 $28,293,802 After 2018 $1,882,439 State $1,903,877 $7,073,451 $470,610 Other $0 $0 $0 Total $9,519,385 $35,367,253 $2,353,049 Total Project Cost: Total Project Authorizations: Total Parcels: $ 47,239,687 $0 120 Project Details: Widen from 2 to 4 lanes- improve mobility and reduce congestion- enhance economic development- reduce crash frequency Also in Ben Hill County Project: 0000314 Type Work: Widening Descp:SR 107 FROM CR 250/TURNER COUNTY TO CR 264/IRWIN COUNTY Lanes: Exist. 2 Prop. 4 Length: 7.10 Phase ROW CST UTL Fund STP STP STP Year Federal 2018 $3,643,900 After 2018 $28,865,254 After 2018 $720,865 State $910,975 $7,216,313 $180,216 Other $0 $0 $0 Total $4,554,875 $36,081,567 $901,081 Total Project Cost: Total Project Authorizations: Total Parcels: $ 41,537,522 $0 46 Project Details: widen from 2 to 4 lanes, improve mobility and reduce congestion, enhance economic development and reduce crash frequency- Also in Turner County Project: 0007591 Type Work: Sidewalks Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN OCILLA Length: 0.36 Total Project Cost: Total Project Authorizations: Total Parcels: $ 512,839 $0 0 Phase CST Fund HPP Year 2015 Federal $410,271 State $0 Other $102,568 Total $512,839 Project: 0010669 Type Work: TE-Bike/Ped Facility Descp:SR 32 FROM CR 252/OAK STREET TO CS 524/RUTHERFORD DRIVE Length: 0.65 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 437,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $350,000 State $0 Other $87,500 Total $437,500 226 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004860 Type Work: Resurface & Maintenance Descp:SR 206 FROM N OF BROXTON HWY/BEN HILL TO N OF SR 32/COFFEE Length: 16.35 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,722,636 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,378,109 State $344,527 Other $0 Total $1,722,636 Also in Ben Hill, Coffee County Project: M005167 Type Work: Resurface & Maintenance Descp:SR 35 FROM TIFT COUNTY LINE TO SR 32 Length: 9.50 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,668,183 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,334,546 State $333,637 Other $0 Total $1,668,183 Project: M005182 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 32/IRWIN TO CS 629/BUSH AVE/BEN HILL Length: 10.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,400,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,720,000 State $680,000 Other $0 Total $3,400,000 Also in Ben Hill County Project: M005209 Type Work: Resurface & Maintenance Descp:SR 32 FROM SR 125 TO DOUGLAS CITY LIMITS Length: 35.02 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 286,758 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $229,406 State $57,352 Other $0 Total $286,758 Also in Coffee County Irwin Totals Summary County Summary excludes lump sum projects. Project PI# 0000313 0000314 0007591 Year 2018 2018 2015 Phase ROW ROW CST Fund STP STP HPP Federal $2,817,738 $2,113,462 $410,271 State $704,434 $528,365 $0 Other $0 $0 $102,568 Total $3,522,172 $2,641,827 $512,839 $5,341,471 $1,232,800 $102,568 $6,676,838 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 227 STATE TRANSPORTATION IMPROVEMENT PROGRAM Jackson Project: 0007176 Type Work: Replace Bridge Descp:SR 82 SPUR @ NORTH OCONNEE RIVER 6.8 MI NORTH OF JEFFERSON Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,489,566 $ 341,854 0 Phase PE ROW CST UTL Fund Bridge STP STP STP Year 2014 2018 After 2018 2018 Federal $273,483 $107,903 $3,774,341 $235,926 State $68,371 $26,976 $943,585 $58,981 Other $0 $0 $0 $0 Total $341,854 $134,878 $4,717,927 $294,907 Project: 0007177 Type Work: Replace Bridge Descp:SR 334 @ SANDY CREEK 11.5 MI SOUTHEAST OF JEFFERSON Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,287,019 $ 551,291 0 Phase PE ROW CST UTL Fund Bridge STP STP STP Year 2014 2017 2018 2018 Federal $441,033 $84,908 $5,967,348 $136,327 State $110,258 $21,227 $1,491,837 $34,082 Other $0 $0 $0 $0 Total $551,291 $106,135 $7,459,185 $170,408 Project: 0010022 Type Work: Sidewalks Descp:JEFFERSON CITY SCHOOL SYSTEM - SRTS Length: 1.06 Phase CST Fund Safety Year LUMP Federal $485,197 Total Project Cost: Total Project Authorizations: Total Parcels: $ 485,197 $0 0 Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2015 - FY 2018 State $0 Other $0 Total $485,197 Project: 0010699 Type Work: TE-Bike/Ped Facility Descp:SR 15 ALT FM CS 749/LAKEVIEW DRIVE TO COMMERCE MIDDLE SCHOOL Length: 1.21 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 312,500 $0 11 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $250,000 State $0 Other $62,500 Total $312,500 Project: 0011672 Type Work: Signals Descp:I-85 @3 LOC; SR 11 @4 LOC & SR 15 ALT @1 LOC-SIGNAL UPGRADES Length: 3.20 Phase CST UTL Fund STP STP Year LUMP LUMP Federal $1,335,752 $146,940 State $0 $0 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,482,692 $0 8 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Other $0 $0 Total $1,335,752 $146,940 228 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0011677 Type Work: Replace Bridge Descp:SR 11 @ MULBERRY RIVER TRIBUTARY 6.3 MI SW OF JEFFERSON Length: 0.14 Total Project Cost: Total Project Authorizations: Total Parcels: $ 775,588 $0 4 Phase ROW CST Fund STP STP Year 2016 2017 Federal $114,860 $505,610 State $28,715 $126,403 Other $0 $0 Total $143,575 $632,013 Project: 110630- Type Work: Widening Descp:I-85 FM N OF SR 53/GREEN ST TO N OF SR 11/US 129/LEE ST Lanes: Exist. 4 Prop. 6 Length: 8.00 Phase PE CST Fund NHPP NHPP Year 2018 After 2018 Federal $353,306 $67,748,412 State $88,326 $16,937,103 Total Project Cost: Total Project Authorizations: Total Parcels: $ 85,127,148 $0 0 Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help enhance economic development and will reduce crash frequency. Project: 121340- Type Work: Replace Bridge Descp:SR 11/US 129 @ ALLEN CREEK NORTH OF TALMO Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,625,505 $ 20,000 0 Phase PE CST Fund Bridge NHPP Year 2014 2016 Federal $16,000 $2,084,404 State $4,000 $521,101 Other $0 $0 Total $441,632 $84,685,515 Other $0 $0 Total $20,000 $2,605,505 Project: 122150- Type Work: Widening Descp:SR 11/US 129 FM SR 332 @ TALMO/JACKSON TO SR 323/HALL Lanes: Exist. 2 Prop. 4 Length: 6.72 Phase CST UTL Fund NHPP NHPP Year 2016 2016 Federal $30,808,083 $645,642 State $7,702,021 $161,411 Other $0 $0 Total $38,510,104 $807,053 Total Project Cost: Total Project Authorizations: Total Parcels: $ 39,317,157 $0 188 Project Details: Widen from 2 to 4 lanes - reduce congestion - improve operation and mobility - reduce crash frequency - enhance economic development. Also in Hall County Project: M004774 Type Work: Resurface & Maintenance Descp:SR 98 FROM I-85 TO SR 98WE Length: 2.70 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 617,515 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $494,012 State $123,503 Other $0 Total $617,515 229 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005020 Type Work: Resurface & Maintenance Descp:SR 326 FROM SR 98 TO SR 15 Length: 1.10 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 358,026 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $286,420 State $71,605 Other $0 Total $358,026 Project: M005098 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 11BU TO 0.45 MI N OF SR 332 Length: 6.40 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,867,629 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $3,094,103 State $773,526 Other $0 Total $3,867,629 Project: M005136 Type Work: Resurface & Maintenance Descp:SR 11 FROM CR 205/TALMO TRAIL ROAD TO HALL COUNTY LINE Length: 1.71 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 426,303 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $341,042 State $85,261 Other $0 Total $426,303 Project: M005227 Type Work: Bridges Descp:I-85 @ 9 LOCS & I-985 @ 6 LOCS - BRIDGE PRESERVATION Length: 0.00 Phase PE CST Fund IM NHPP Year 2014 LUMP Federal $40,500 $1,376,779 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,574,754 $ 45,000 0 Project Details: Painting steel superstructure on State Freight Network Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $4,500 $152,975 Other $0 $0 Total $45,000 $1,529,754 Also in Franklin, Gwinnett, Hall County 230 STATE TRANSPORTATION IMPROVEMENT PROGRAM Jackson Totals Summary County Summary excludes lump sum projects. Project PI# 0007176 0007176 0007177 0007177 0007177 0011677 0011677 110630121340122150122150- Year 2018 2018 2017 2018 2018 2016 2017 2018 2016 2016 2016 Phase ROW UTL ROW CST UTL ROW CST PE CST CST UTL Fund STP STP STP STP STP STP STP NHPP NHPP NHPP NHPP Federal $107,903 $235,926 $84,908 $5,967,348 $136,327 $114,860 $505,610 $353,306 $2,084,404 $9,550,506 $200,149 State $26,976 $58,981 $21,227 $1,491,837 $34,082 $28,715 $126,403 $88,326 $521,101 $2,387,626 $50,037 Other $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $134,878 $294,907 $106,135 $7,459,185 $170,408 $143,575 $632,013 $441,632 $2,605,505 $11,938,132 $250,186 $19,341,245 $4,835,311 $0 $24,176,557 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 231 STATE TRANSPORTATION IMPROVEMENT PROGRAM Jasper Project: 0001939 Type Work: New Construction Descp:MONTICELLO NE BYPASS FM SR 16 TO SR 83 Lanes: Exist. 0 Prop. 2 Length: 3.28 Phase ROW CST Fund STP STP Year Federal 2015 $1,244,400 After 2018 $10,977,804 State $311,100 $2,744,451 Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,277,755 $0 12 Project Details: New location of a 2 lane bypass - Improve mobility & connectivity enhance economic development opportunities Other $0 $0 Total $1,555,500 $13,722,255 Project: 0004444 Type Work: Guardrail Descp:SR 212 @ LAKE JACKSON GUARDRAIL @ APPROACHES Length: 0.40 Phase ROW CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 348,145 $0 6 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $179,046 $169,099 State $0 $0 Other $0 $0 Total $179,046 $169,099 Also in Newton County Project: 0007593 Type Work: Sidewalks Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN MONTICELLO Length: 0.95 Total Project Cost: Total Project Authorizations: Total Parcels: $ 516,102 $ 12,500 21 Phase ROW CST CST Fund Local HPP Local Year 2014 2015 2015 Federal $0 $329,950 $0 State $0 $0 $0 Other $12,500 $138,052 $35,600 Total $12,500 $468,002 $35,600 Project: 0010670 Type Work: TE-Rehab Hist Trans Bldg Descp:SEVEN ISLANDS ROAD INTERPRETATIVE MUSEUM & VISITORS CENTER Length: 0.40 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 312,500 $0 1 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $250,000 State $0 Other $62,500 Total $312,500 232 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 231730- Type Work: Passing Lanes Descp:SR 83 FM N OF CR 73 TO S OF CR 77 & CR 144 TO S OF CR 133 Lanes: Exist. 2 Prop. 3 Length: 2.48 Phase PE CST CST Fund STP STP Bond Year 2014 2015 2015 Federal $242,024 $64,917 $0 State $60,506 $16,229 $3,501,851 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,885,526 $ 3,885,526 18 Project Details: Project will improve passing opportunities along the corridor for motorist and address operational and safety issues at key locations. Project: M005021 Type Work: Resurface & Maintenance Descp:SR 212 FROM SR 16 TO PUTNAM COUNTY LINE Length: 9.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,566,158 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,052,927 State $513,232 Other $0 $0 $0 Other $0 Total $302,529 $81,146 $3,501,851 Total $2,566,158 Project: M005039 Type Work: Resurface & Maintenance Descp:SR 11 SO FROM SR 11 TO SR 11 Length: 0.11 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 18,350 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $14,680 State $3,670 Other $0 Total $18,350 Project: M005150 Type Work: Resurface & Maintenance Descp:SR 83 FROM MONROE COUNTY LINE TO SR 16 Length: 13.71 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,287,126 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,829,701 State $457,425 Other $0 Total $2,287,126 233 STATE TRANSPORTATION IMPROVEMENT PROGRAM Jasper Totals Summary County Summary excludes lump sum projects. Project PI# 0001939 0007593 0007593 231730231730- Year 2015 2015 2015 2015 2015 Phase ROW CST CST CST CST Fund STP Local HPP Bond STP Federal $1,244,400 $0 $329,950 $0 $64,917 State $311,100 $0 $0 $3,501,851 $16,229 Other $0 $35,600 $138,052 $0 $0 Total $1,555,500 $35,600 $468,002 $3,501,851 $81,146 $1,639,267 $3,829,180 $173,652 $5,642,099 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 234 STATE TRANSPORTATION IMPROVEMENT PROGRAM Jeff Davis Project: 0001810 Type Work: Railroad Crossing Descp:SR 19/US 23 OVERPASS @ NORFOLK-SOUTHERN RR GRADE CROSSING Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,593,779 $0 0 Phase PE ROW CST Fund STP STP STP Year 2015 2017 After 2018 Federal $176,000 $494,947 $2,204,076 State $44,000 $123,737 $551,019 Other $0 $0 $0 Total $220,000 $618,684 $2,755,095 Project: 0007037 Type Work: Replace Bridge Descp:SR 135 @ ALTAMAHA RIVER - TIA Length: 0.60 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,441,627 $ 1,740,833 0 Phase PE ROW CST CST Fund STP STP State STP Year 2017 2017 2014 After 2018 Federal $8,000 $42,448 $0 $5,310,187 State $2,000 $10,612 $0 $1,327,547 Other $0 $0 $1,740,833 $0 Total $10,000 $53,060 $1,740,833 $6,637,734 Also in Montgomery County Project: 0009876 Type Work: Roundabout Descp:SR 107 @ SR 268 Length: 1.00 Phase PE CST Fund HSIP HSIP Year LUMP LUMP Federal $165,612 $938,469 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,104,081 $0 0 Project Details: Project will improve the capacity and operations of the intersection to enhance mobility. Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 State $0 $0 Other $0 $0 Total $165,612 $938,469 Project: 533176- Type Work: Replace Bridge Descp:SR 135 @ WHITEHEAD CREEK 1 MI OF DENTON Length: 0.61 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,951,619 $ 210,000 7 Phase ROW CST Fund STP STP Year 2014 2015 Federal $168,000 $2,993,295 State $42,000 $748,324 Other $0 $0 Total $210,000 $3,741,619 Project: M004554 Type Work: Resurface & Maintenance Descp:SR 268 FROM COFFEE COUNTY LINE TO 0.02 MI E OF SR 107 Length: 8.12 Phase CST Fund STP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,158,590 $ 1,158,590 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $926,872 State $231,718 Other $0 Total $1,158,590 235 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004595 Type Work: Resurface & Maintenance Descp:SR 135 CONN FROM SR 19 TO 0.01 MI E OF SR 135 IN HAZLEHURST Length: 0.70 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 271,361 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $217,089 State $54,272 Other $0 Total $271,361 Project: M004600 Type Work: Resurface & Maintenance Descp:SR 107 FROM COFFEE COUNTY LINE TO SR 135 Length: 8.77 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,399,303 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,119,442 State $279,861 Other $0 Total $1,399,303 Project: M005170 Type Work: Resurface & Maintenance Descp:SR 19 FROM BACON COUNTY LINE TO SR 135 CONN Length: 10.96 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,264,475 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,811,580 State $452,895 Other $0 Total $2,264,475 Also in Appling County Jeff Davis Totals Summary County Summary excludes lump sum projects. Project PI# 0001810 0001810 0007037 0007037 533176- Year 2015 2017 2017 2017 2015 Phase PE ROW PE ROW CST Fund STP STP STP STP STP Federal $176,000 $494,947 $4,000 $21,224 $2,993,295 State $44,000 $123,737 $1,000 $5,306 $748,324 Other $0 $0 $0 $0 $0 Total $220,000 $618,684 $5,000 $26,530 $3,741,619 $3,689,467 $922,367 $0 $4,611,834 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 236 STATE TRANSPORTATION IMPROVEMENT PROGRAM Jefferson Project: 0013258 Type Work: Pedestrian Crossings Descp:SR 4; SR 17 & SR 24 @ 4 LOCS - PEDESTRIAN UPGRADES Length: 1.60 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 636,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $122,400 $450,000 State $13,600 $50,000 Other $0 $0 Total $136,000 $500,000 Also in Burke, McDuffie County Project: 0013262 Type Work: RRX Consolidation Descp:CS 632/BETHEA STREET @ NS #732762B IN WADLEY Length: 0.40 Phase CST Fund STP Year 2015 Federal $7,500 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,500 $0 0 Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018 State $0 Other $0 Total $7,500 Project: 222120- Type Work: Widening Descp:SR 4/US 1 FM WADLEY BYPASS TO LOUISV'LE BYP/INCL BRIDGES Lanes: Exist. 2 Prop. 4 Length: 6.53 Phase ROW CST Fund NHPP NHPP Year 2018 After 2018 Federal $4,637,014 $24,511,258 State $1,159,254 $6,127,815 Total Project Cost: Total Project Authorizations: Total Parcels: $ 36,435,341 $0 60 Project Details: Provide additional capacity - improve mobility and reduce congestion - enhance economic development - reduce crash frequency - State Freight Network Other $0 $0 Total $5,796,268 $30,639,073 Project: 222150- Type Work: Widening Descp:SR 4/US 1/LOUISVILLE BYP FM SR 4 BU/US 1BU TO CR 325 - TIA Lanes: Exist. 2 Prop. 4 Length: 2.54 Phase ROW CST CST Fund NHPP State NHPP Year 2015 2014 2017 Federal $888,460 $0 $13,691,215 State $222,115 $0 $3,422,804 Other $0 $5,975,463 $0 Total Project Cost: Total Project Authorizations: Total Parcels: $ 24,200,057 $ 5,975,463 106 Project Details: Provide additional capacity - improve mobility and reduce congestion - enhance economic development - reduce crash frequency - State Freight Network Total $1,110,575 $5,975,463 $17,114,018 237 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 222160- Type Work: Widening Descp:SR 4/US 1 FM LOUISVILLE BYP @ CR 325 TO CR 138/MENNONITE CH Lanes: Exist. 2 Prop. 4 Length: 5.80 Phase ROW CST Fund NHPP NHPP Year Federal 2018 $4,777,613 After 2018 $20,248,566 State $1,194,403 $5,062,141 Total Project Cost: Total Project Authorizations: Total Parcels: $ 31,282,724 $0 65 Project Details: Widen 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development - Project on GRIP corridor & State Freight Network if on GRIP/FN Project: 222170- Type Work: Widening Descp:SR 4/US 1 FM CR 138 NORTH TO SR 88/FALL LINE FREEWAY Lanes: Exist. 2 Prop. 4 Length: 6.70 Phase ROW CST Fund NHPP NHPP Year Federal 2018 $6,821,493 After 2018 $45,435,523 State $1,705,373 $11,358,881 Total Project Cost: Total Project Authorizations: Total Parcels: $ 65,321,270 $0 65 Project Details: Provide additional capacity - improve mobility and reduce congestion - enhance economic development - reduce crash frequency - State Freight Network Project: 232265- Type Work: Replace Bridge Descp:SR 4/US 1 @ BIG CREEK 9 MI N OF LOUISVILLE Lanes: Exist. 2 Prop. 4 Length: 0.22 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,345,218 $0 0 Phase PE CST Fund NHPP NHPP Year 2016 After 2018 Federal $292,800 $1,583,375 State $73,200 $395,844 Other $0 $0 Total $5,972,017 $25,310,707 Other $0 $0 Total $8,526,866 $56,794,404 Other $0 $0 Total $366,000 $1,979,218 Project: M004976 Type Work: Resurface & Maintenance Descp:SR 4BU FROM SR 4 TO SR 4 IN LOUISVILLE Length: 2.76 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 464,835 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $371,868 State $92,967 Other $0 Total $464,835 Project: M005130 Type Work: Resurface & Maintenance Descp:SR 4BU FM SR 4 S OF WADLEY CITY TO SR 4 N OF WADLEY CITY Length: 3.60 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,352,051 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,081,641 State $270,410 Other $0 Total $1,352,051 238 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005145 Type Work: Resurface & Maintenance Descp:SR 4 FROM SR 4BU/KENNEDY ROAD TO N OF SR 4BU/MAIN STREET Length: 3.60 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,986,703 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,589,363 State $397,341 Other $0 Total $1,986,703 Project: M005151 Type Work: Resurface & Maintenance Descp:SR 24 FROM SR 4BU TO WASHINGTON COUNTY LINE Length: 8.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,571,249 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,256,999 State $314,250 Other $0 Total $1,571,249 Project: M005152 Type Work: Resurface & Maintenance Descp:SR 88 FROM SR 80 TO BURKE COUNTY LINE Length: 9.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,256,531 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,805,225 State $451,306 Other $0 Total $2,256,531 Project: M005202 Type Work: Resurface & Maintenance Descp:SR 80 FROM SR 17 TO SR 296 Length: 2.80 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 804,787 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $643,830 State $160,957 Other $0 Total $804,787 239 STATE TRANSPORTATION IMPROVEMENT PROGRAM Jefferson Totals Summary County Summary excludes lump sum projects. Project PI# 222120222150222150222160222170232265- Year 2018 2015 2017 2018 2018 2016 Phase ROW ROW CST ROW ROW PE Fund NHPP NHPP NHPP NHPP NHPP NHPP Federal $4,637,014 $888,460 $13,691,215 $4,777,613 $6,821,493 $292,800 State $1,159,254 $222,115 $3,422,804 $1,194,403 $1,705,373 $73,200 Other $0 $0 $0 $0 $0 $0 Total $5,796,268 $1,110,575 $17,114,018 $5,972,017 $8,526,866 $366,000 $31,108,596 $7,777,149 $0 $38,885,744 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 240 STATE TRANSPORTATION IMPROVEMENT PROGRAM Jenkins Project: 0006319 Type Work: Replace Bridge Descp:CR 200/OLD SAVANNAH ROAD @ SCULLS CREEK 5.3 MI S OF MILLEN Length: 0.47 Phase PE ROW CST Fund STP Local STP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,450,226 $ 171,160 5 Year 2014 2014 2015 Federal $8,000 $0 $1,023,253 State $2,000 $0 $255,813 Other $0 $161,160 $0 Total $10,000 $161,160 $1,279,066 Project: 0010716 Type Work: TE-Bike/Ped Facility Descp:MILLEN DOWNTOWN STREETSCAPE/GREENSPACE PRESERVATION @ Length: 0.92 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,250,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $1,000,000 State $0 Other $250,000 Total $1,250,000 Project: 0011756 Type Work: Scenic Hwy Program Descp:MILLEN-JENKINS COUNTY SCENIC BYWAY INTERPRETIVE VISTOR CTR Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 834,680 $ 15,000 0 Phase PE CST Fund Byways Byways Year 2014 2016 Federal $12,000 $655,744 State $0 $0 Other $3,000 $163,936 Total $15,000 $819,680 Jenkins Totals Summary County Summary excludes lump sum projects. Project PI# 0006319 0011756 Year 2015 2016 Phase CST CST Fund STP Byways Federal $1,023,253 $655,744 State $255,813 $0 Other $0 $163,936 Total $1,279,066 $819,680 $1,678,997 $255,813 $163,936 $2,098,746 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 241 STATE TRANSPORTATION IMPROVEMENT PROGRAM Johnson Project: 0007178 Type Work: Replace Bridge Descp:SR 171 @ HOLTEN CREEK 0.6 MI S OF KITE Length: 0.32 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,688,173 $0 5 Phase ROW CST Fund STP STP Year 2015 2017 Federal $116,688 $1,233,850 State $29,172 $308,463 Other $0 $0 Total $145,860 $1,542,313 Project: 0007180 Type Work: Replace Bridge Descp:SR 171 @ LITTLE OHOOPEE RIVER 2.7 MI N OF KITE Length: 0.18 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,904,180 $0 3 Phase ROW CST Fund STP STP Year 2015 2017 Federal $113,424 $1,409,920 State $28,356 $352,480 Other $0 $0 Total $141,780 $1,762,400 Project: M005203 Type Work: Resurface & Maintenance Descp:SR 15 FM WRIGHTSVILLE CITY LIMITS TO WASHINGTON COUNTY LINE Length: 5.01 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,536,001 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,228,800 State $307,200 Other $0 Total $1,536,001 Johnson Totals Summary County Summary excludes lump sum projects. Project PI# 0007178 0007178 0007180 0007180 Year 2015 2017 2015 2017 Phase ROW CST ROW CST Fund STP STP STP STP Federal $116,688 $1,233,850 $113,424 $1,409,920 State $29,172 $308,463 $28,356 $352,480 Other $0 $0 $0 $0 Total $145,860 $1,542,313 $141,780 $1,762,400 $2,873,882 $718,471 $0 $3,592,353 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 242 STATE TRANSPORTATION IMPROVEMENT PROGRAM Jones Project: 0010671 Type Work: TE-Bike/Ped Facility Descp:JONES COUNTY TRAILS @ 6 LOCS - PHASE II Length: 2.93 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 814,000 $0 12 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $651,200 State $0 Other $162,800 Project: 370860- Type Work: Replace Bridge Descp:CR 28 @ CHEHAW CREEK W OF CLINTON Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $81,600 $0 $408,000 $8,160 State $20,400 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $814,000 Total $102,000 $10,824 $510,000 $10,200 Project: M005066 Type Work: Resurface & Maintenance Descp:SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE Length: 14.11 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,165,784 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $4,932,627 State $1,233,157 Other $0 Total $6,165,784 Project PI# 370860- Year 2016 Jones Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Phase Fund Federal State Other ROW Local $0 $0 $10,824 Total $10,824 $0 $0 $10,824 $10,824 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 243 STATE TRANSPORTATION IMPROVEMENT PROGRAM Lamar Project: 371173- Type Work: Replace Bridge Descp:CR 219/RUFFIN ROAD @ POTATO CREEK IN PIEDMONT Length: 0.22 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $300,000 $10,824 $510,000 $10,200 Project: M005001 Type Work: Resurface & Maintenance Descp:SR 18 FROM E BARNESVILLE BYPASS/LAMAR TO W OF SR 83/MONROE Length: 10.75 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,164,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $931,200 State $232,800 Other $0 Total $1,164,000 Also in Monroe County Project: M005045 Type Work: Resurface & Maintenance Descp:SR 7 FROM CS 600/REDBUD DRIVE TO CR 322/MEADOVISTA ROAD Length: 14.46 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,564,550 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $5,251,640 State $1,312,910 Other $0 Total $6,564,550 Also in Pike, Spalding County Lamar Totals Summary County Summary excludes lump sum projects. Project PI# 371173- Year 2016 Phase ROW Fund Local Federal $0 State $0 Other $10,824 Total $10,824 $0 $0 $10,824 $10,824 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 244 STATE TRANSPORTATION IMPROVEMENT PROGRAM Lanier Project: 0007181 Type Work: Replace Bridge Descp:SR 64 @ TEN MILE CREEK 6.5 MI NORTHWEST OF LAKELAND Length: 0.27 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,359,865 $0 4 Phase ROW CST Fund STP STP Year 2015 2017 Federal $374,544 $1,513,348 State $93,636 $378,337 Other $0 $0 Total $468,180 $1,891,685 Project: 0007182 Type Work: Replace Bridge Descp:SR 64 @ FIVE MILE CREEK 5 MI NORTH OF LAKELAND Length: 0.14 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,080,103 $0 4 Phase ROW CST Fund STP STP Year 2015 2017 Federal $511,632 $1,152,450 State $127,908 $288,113 Other $0 $0 Total $639,540 $1,440,563 Project: 0010589 Type Work: TE-Bike/Ped Facility Descp:SR 135 FROM CR 47/SIMPSON AVE TO CR 324/BURNT CHURCH ROAD Length: 7.02 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 312,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $250,000 State $0 Other $62,500 Total $312,500 Project: M005095 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 94/ECHOLS COUNTY TO SR 38/LANIER COUNTY Length: 16.56 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,046,278 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,437,022 State $609,256 Other $0 Total $3,046,278 Also in Echols County Project: M005123 Type Work: Resurface & Maintenance Descp:SR 11/US 129 FROM SR 37 TO BERRIEN COUNTY LINE Length: 8.27 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,169,400 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,535,520 State $633,880 Other $0 Total $3,169,400 245 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project PI# 0007181 0007181 0007182 0007182 Year 2015 2017 2015 2017 Lanier Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Phase Fund Federal State Other ROW STP $374,544 $93,636 $0 CST STP $1,513,348 $378,337 $0 ROW STP $511,632 $127,908 $0 CST STP $1,152,450 $288,113 $0 Total $468,180 $1,891,685 $639,540 $1,440,563 $3,551,975 $887,994 $0 $4,439,968 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 246 STATE TRANSPORTATION IMPROVEMENT PROGRAM Laurens Project: 0000833 Type Work: Bridges Descp:NEW OCONEE RVR X'ING FM COUNTRY CLUB TO BLACKSHEAR&FERRY-TIA Lanes: Exist. 0 Prop. 2 Length: 2.60 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,098,729 $ 8,055,681 21 Phase PE ROW CST CST Fund State Local State STP Year 2014 2014 2014 2015 Federal $0 $0 $0 $3,234,438 State $0 $0 $0 $808,610 Other $220,000 $514,080 $7,321,601 $0 Total $220,000 $514,080 $7,321,601 $4,043,048 Project: 0013177 Type Work: RRX Warning Device Descp:CR 531/MINTER TWEED ROAD @ GCR #641032A Length: 0.40 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 205,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $5,000 $200,000 State $0 $0 Other $0 $0 Total $5,000 $200,000 Project: 262027- Type Work: Widening Descp:SR 31/US 441 FROM S OF SR 117 TO CR 354/PINEHILL ROAD Lanes: Exist. 2 Prop. 4 Length: 4.00 Phase ROW CST UTL Fund NHPP NHPP NHPP Year Federal 2017 $8,059,238 After 2018 $15,393,268 After 2018 $1,670,011 State $2,014,810 $3,848,317 $417,503 Total Project Cost: Total Project Authorizations: Total Parcels: $ 31,403,145 $0 68 Project Details: Widen from 2 to 4 lanes- provide additional capacity to improve mobility and reduce congestion - enhance economic development and reduce crash frequency- on the statewide freight corridor Project: 270724- Type Work: Replace Bridge Descp:CR 421/CHAPELL MILL ROAD @ TURKEY CREEK N OF MONTROSE Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $0 $0 Total $10,074,048 $19,241,585 $2,087,513 Other $0 $10,824 $0 $0 Total $300,000 $10,824 $510,000 $10,200 Project: 270725- Type Work: Replace Bridge Descp:CR 264 @ LIME SINK CREEK SE OF CADWELL Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $300,000 $10,824 $510,000 $10,200 247 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 270746- Type Work: Replace Bridge Descp:CR 423 NW OF DUBLIN @ SANDY CREEK Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $300,000 $10,824 $510,000 $10,200 Project: M004189 Type Work: Signing Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,700,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Project: M004704 Type Work: Resurface & Maintenance Descp:SR 31/US 319 FROM I-16 TO SR 26 Length: 4.43 Phase CST Fund NHPP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,632,256 $ 1,632,256 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,700,000 Federal $1,305,805 State $0 Other $0 Total $1,700,000 Also in Bleckley, Emanuel, Treutlen County State $326,451 Other $0 Total $1,632,256 Project: M004705 Type Work: Resurface & Maintenance Descp:SR 257 FROM 0.04 MI N OF CS 493/INDUSTRIAL BLVD TO SR 31 Length: 1.78 Phase CST Fund STP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 422,592 $ 422,592 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $338,073 State $84,518 Other $0 Total $422,592 Project: M004889 Type Work: Resurface & Maintenance Descp:SR 29 FROM SR 26 TO CR 471/ED SWINSON ROAD Length: 5.37 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,263,767 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,811,014 State $452,753 Other $0 Total $2,263,767 248 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005081 Type Work: Resurface & Maintenance Descp:SR 257 FROM CS 581/N ALPHA STREET TO I-16 Length: 6.85 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 841,990 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $673,592 State $168,398 Other $0 Total $841,990 Laurens Totals Summary County Summary excludes lump sum projects. Project PI# 0000833 262027270724270725270746- Year 2015 2017 2016 2016 2016 Phase CST ROW ROW ROW ROW Fund STP NHPP Local Local Local Federal $3,234,438 $8,059,238 $0 $0 $0 State $808,610 $2,014,810 $0 $0 $0 Other $0 $0 $10,824 $10,824 $10,824 Total $4,043,048 $10,074,048 $10,824 $10,824 $10,824 $11,293,676 $2,823,419 $32,473 $14,149,568 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 249 STATE TRANSPORTATION IMPROVEMENT PROGRAM Lee Project: 0009264 Type Work: Miscellaneous Improvements Descp:LEESBURG TRAIN DEPOT - RENOVATION & PRESERVATION Length: 0.00 Phase Fund CST Other Funds Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 292,078 $0 0 Federal $233,662 State $58,416 Other $0 Total $292,078 Project: 0009865 Type Work: Replace Bridge Descp:SR 118 @ MUCKALOOCHEE CREEK Length: 0.17 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,269,771 $ 120,000 5 Phase ROW CST Fund Bridge STP Year 2014 2015 Federal $96,000 $919,817 State $24,000 $229,954 Other $0 $0 Total $120,000 $1,149,771 Project: M004432 Type Work: Bridge Painting Descp:SR 93 @ LITTLE TIRED CREEK TRIB & SR 195 @ MUCKALEE CREEK Length: 0.80 Phase PE CST Fund STP STP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 204,000 $0 0 Project Details: Bridge painting and remove lead based paint system Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Federal $3,200 $160,000 State $800 $40,000 Other $0 $0 Total $4,000 $200,000 Also in Grady County Project: M004804 Type Work: Resurface & Maintenance Descp:SR 118 FROM KINCHAFOONEE CREEK TO SUMTER COUNTY Length: 11.63 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,800,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,440,000 State $360,000 Other $0 Total $1,800,000 Project PI# Lee Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Year Phase Fund Federal State Other Total 0009264 0009865 2015 2015 CST Other Funds CST STP $233,662 $919,817 $58,416 $229,954 $0 $292,078 $0 $1,149,771 $1,153,479 $288,370 $0 $1,441,848 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 250 STATE TRANSPORTATION IMPROVEMENT PROGRAM Lincoln Project: 0007040 Type Work: Replace Bridge Descp:SR 43 @ LITTLE RIVER @ LINCOLN/MCDUFFIE COUNTY LINE Length: 0.65 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,703,109 $0 2 Phase CST UTL Fund Bond STP Year 2015 2015 Federal $0 $311,307 State $8,313,974 $77,827 Other $0 $0 Total $8,313,974 $389,134 Also in McDuffie County Project: 0010413 Type Work: Replace Bridge Descp:SR 43 @ SOAP CREEK 4 MI E OF LINCOLNTON Length: 0.56 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,740,349 $0 4 Phase ROW CST Fund STP STP Year 2015 2017 Federal $97,920 $3,694,360 State $24,480 $923,590 Other $0 $0 Total $122,400 $4,617,949 Project: 0010698 Type Work: TE-Bike/Ped Facility Descp:LINCOLNTON DOWNTOWN STREETSCAPES @ 5 LOCS - PHASE III Length: 0.98 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 281,250 $0 1 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $225,000 State $0 Other $56,250 Total $281,250 Project: M004701 Type Work: Resurface & Maintenance Phase CST Descp:SR 44 FROM SR 17BU/WILKES TO SR 79/LINCOLN Length: 15.23 Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,103,780 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,483,024 State $620,756 Other $0 Total $3,103,780 Also in Wilkes County 251 STATE TRANSPORTATION IMPROVEMENT PROGRAM Lincoln Totals Summary County Summary excludes lump sum projects. Project PI# 0007040 0007040 0010413 0010413 Year 2015 2015 2015 2017 Phase CST UTL ROW CST Fund Bond STP STP STP Federal $0 $155,654 $97,920 $3,694,360 State $4,156,987 $38,913 $24,480 $923,590 Other $0 $0 $0 $0 Total $4,156,987 $194,567 $122,400 $4,617,949 $3,947,933 $5,143,971 $0 $9,091,904 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 252 STATE TRANSPORTATION IMPROVEMENT PROGRAM Long Project: M004593 Type Work: Resurface & Maintenance Descp:SR 38/US 84 FROM SR 57/LONG TO 0.04 MI W OF SR 119/LIBERTY Length: 7.79 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,813,821 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $3,051,057 State $762,764 Other $0 Total $3,813,821 Also in Liberty County Project: M005008 Type Work: Resurface & Maintenance Descp:SR 23 FROM LUDOWICI CITY LIMITS TO TATTNALL COUNTY LINE Length: 14.65 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,275,424 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $4,220,340 State $1,055,085 Other $0 Total $5,275,424 Project: M005171 Type Work: Resurface & Maintenance Descp:SR 144 FROM TATTNALL COUNTY LINE TO SR 119 Phase CST Length: 15.88 Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,299,070 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,639,256 State $659,814 Other $0 Total $3,299,070 Also in Liberty County 253 STATE TRANSPORTATION IMPROVEMENT PROGRAM Lumpkin Project: 0007495 Type Work: Pedestrian Crossings Descp:PEDESTRIAN UPGRADES @ 19 SR LOCATIONS IN DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,369,911 $ 580,000 18 Phase PE ROW CST UTL Fund HSIP HSIP HSIP HSIP Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Project: 0008912 Type Work: Streetscapes Descp:DOWNTOWN DEVELOPMENT AUTHORITY DIST STREETSCAPE IN DAHLONEGA Length: 0.10 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,256,070 $0 4 Phase ROW CST CST UTL Fund Local HPP Local Local Year 2014 2014 LUMP LUMP Year LOCL 2015 2015 2015 Federal $18,000 $504,000 $2,429,920 $81,000 Federal $0 $40,553 $0 $0 State $2,000 $56,000 $269,991 $9,000 Other $0 $0 $0 $0 Total $20,000 $560,000 $2,699,911 $90,000 Also in Towns, Union, White County State $0 $0 $0 $0 Other $83,000 $0 $682,517 $450,000 Total $83,000 $40,553 $682,517 $450,000 Project: 0009104 Type Work: Bicycle/Ped. Facility Descp:DOWNTOWN DAHLONEGA PEDESTRIAN & LANDSCAPE IMPROVEMENTS Length: 0.15 Total Project Cost: Total Project Authorizations: Total Parcels: $ 126,250 $0 0 Phase CST Fund State Year 2015 Federal $0 State $126,250 Other $0 Total $126,250 Project: 0009948 Type Work: Roundabout Descp:SR 52 @ SR 115/CR 41/COPPER MINE ROAD Length: 0.26 Phase ROW CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,698,369 $0 7 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $759,900 $938,469 State $0 $0 Other $0 $0 Project: 0009949 Type Work: Roundabout Descp:SR 9 @ SR 52 Length: 0.26 Phase ROW CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,209,067 $0 4 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $289,000 $920,067 State $0 $0 Other $0 $0 Total $759,900 $938,469 Total $289,000 $920,067 254 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0009950 Type Work: Roundabout Descp:SR 9 @ SR 60 Length: 0.26 Phase ROW CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,559,649 $0 4 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $621,180 $938,469 State $0 $0 Other $0 $0 Total $621,180 $938,469 Project: 0010681 Type Work: TE-Bike/Ped Facility Descp:SR 60 BU FROM CS 522/CHOICE ST TO CS 530/CHURCH ST Length: 0.20 Phase ROW CST UTL Fund Local STP Local Year LOCL LUMP LOCL Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,476,972 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $0 $500,000 $0 State $0 $0 $0 Other $253,000 $352,472 $371,500 Total $253,000 $852,472 $371,500 Project: M004996 Type Work: Bridges Descp:SR 28; SR 52; SR 72 & SR 77 @ 4 LOCS - SCOUR REPAIR & REHAB Length: 1.20 Phase PE CST Fund STP STP Year 2014 LUMP Federal $360,000 $1,680,000 State $90,000 $420,000 Other $0 $0 Total $450,000 $2,100,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,550,000 $ 450,000 0 Project Details: Painting steel superstructure - deck rehab - correct broken welds - joint replacement - spall repairs on State Freight Network on GRIP network Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Also in Elbert, Hart, Rabun County Project: M005201 Type Work: Resurface & Maintenance Descp:SR 60 FROM CR 179/LODGE DRIVE/HALL TO SR 9/LUMPKIN Length: 10.19 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,693,578 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,354,862 State $338,716 Other $0 Total $1,693,578 Also in Hall County 255 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005214 Type Work: Resurface & Maintenance Descp:SR 60 FROM SR 9 TO UNION COUNTY LINE Length: 5.33 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 885,846 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $708,677 State $177,169 Other $0 Total $885,846 Lumpkin Totals Summary County Summary excludes lump sum projects. Project PI# 0008912 0008912 0008912 0009104 Year 2015 2015 2015 2015 Phase CST CST UTL CST Fund Local HPP Local State Federal $0 $40,553 $0 $0 State $0 $0 $0 $126,250 Other $682,517 $0 $450,000 $0 Total $682,517 $40,553 $450,000 $126,250 $40,553 $126,250 $1,132,517 $1,299,320 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 256 STATE TRANSPORTATION IMPROVEMENT PROGRAM Macon Project: 0007042 Type Work: Replace Bridge Descp:SR 128 @ WHITEWATER CREEK 4 MI N OF OGLETHORPE - TIA Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,422,762 $ 2,500,000 0 Phase PE ROW CST CST UTL Fund State STP State STP STP Year 2014 2017 2014 2018 2018 Federal $0 $118,799 $0 $2,040,682 $178,728 State $0 $29,700 $0 $510,171 $44,682 Other $500,000 $0 $2,000,000 $0 $0 Total $500,000 $148,499 $2,000,000 $2,550,853 $223,410 Project: 0007594 Type Work: Sidewalks Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN MONTEZUMA Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 222,500 $0 0 Phase CST Fund HPP Year 2018 Federal $178,000 State $0 Other $44,500 Total $222,500 Project: 0010603 Type Work: TE-Bike/Ped Facility Descp:SR 26 & SR 49 FM CR 15/CLIFTON BRADLEY DRIVE TO FLINT RIVER Length: 1.81 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $300,000 State $0 Other $75,000 Total $375,000 Project: M004974 Type Work: Resurface & Maintenance Descp:SR 329 FROM SR 26/MACON TO SR 230/DOOLY Length: 9.45 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 829,727 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $663,782 State $165,945 Other $0 Total $829,727 Also in Dooly County Project: M005070 Type Work: Resurface & Maintenance Descp:SR 26 FROM CS 603/STAGECOACH ROAD/MACON TO SR 7/HOUSTON Length: 17.41 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,362,946 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,690,357 State $672,589 Other $0 Total $3,362,946 Also in Houston County 257 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005073 Type Work: Resurface & Maintenance Descp:SR 26 FROM SCHLEY COUNTY LINE TO SR 49 Length: 8.81 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 966,882 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $773,506 State $193,376 Other $0 Total $966,882 Project: M005086 Type Work: Resurface & Maintenance Descp:SR 128 FROM SR 90 TO TAYLOR COUNTY LINE Length: 13.44 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,416,038 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,132,830 State $283,208 Other $0 Total $1,416,038 Project: M005087 Type Work: Resurface & Maintenance Descp:SR 49 FROM SR 90 TO SR 127 Length: 13.56 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,869,370 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $3,095,496 State $773,874 Other $0 Total $3,869,370 Project: M005188 Type Work: Resurface & Maintenance Descp:SR 49 FM SUMTER COUNTY LINE TO N OF CS 577/N RANDOLPH STREET Length: 8.70 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 51,822 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $41,458 State $10,364 Other $0 Total $51,822 258 STATE TRANSPORTATION IMPROVEMENT PROGRAM Macon Totals Summary County Summary excludes lump sum projects. Project PI# 0007042 0007042 0007042 0007594 Year 2017 2018 2018 2018 Phase ROW CST UTL CST Fund STP STP STP HPP Federal $118,799 $2,040,682 $178,728 $178,000 State $29,700 $510,171 $44,682 $0 Other $0 $0 $0 $44,500 Total $148,499 $2,550,853 $223,410 $222,500 $2,516,209 $584,552 $44,500 $3,145,262 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 259 STATE TRANSPORTATION IMPROVEMENT PROGRAM Madison Project: 122650- Type Work: Widening Descp:SR 72 FM WEST CITY LIMITS OF COMER TO E OF BROAD RVR/ELBERT Lanes: Exist. 2 Prop. 4 Length: 9.33 Phase PE CST CST Fund NHPP NHPP Bond Year 2015 2015 2015 Federal $104,000 $1,079,729 $0 State $26,000 $269,932 $55,573,560 Other $0 $0 $0 Total $130,000 $1,349,661 $55,573,560 Total Project Cost: Total Project Authorizations: Total Parcels: $ 57,053,221 $ 56,923,221 0 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development - Project on GRIP corridor & State Freight Network Also in Elbert County Project: M003887 Type Work: Resurface & Maintenance Descp:SR 72 FROM W OF COMER CITY LIMIT TO W OF CR 287/RIVER ROAD Length: 9.44 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,116,155 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,692,924 State $423,231 Other $0 Total $2,116,155 Project: M005175 Type Work: Resurface & Maintenance Descp:SR 22 FROM OGLETHORPE COUNTY LINE TO SR 72 Length: 1.23 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 272,571 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $218,057 State $54,514 Other $0 Total $272,571 Project PI# 122650122650122650- Year 2015 2015 2015 Madison Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Phase Fund Federal State Other PE NHPP $101,920 $25,480 $0 CST Bond $0 $54,462,088 $0 CST NHPP $1,058,134 $264,534 $0 Total $127,400 $54,462,088 $1,322,668 $1,160,054 $54,752,102 $0 $55,912,156 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 260 STATE TRANSPORTATION IMPROVEMENT PROGRAM Marion Project: 0008647 Type Work: Replace Bridge Descp:CR 99/BOB SAVEL ROAD @ LANAHASSEE CREEK TRIBUTARY Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $81,600 $0 $408,000 $8,160 State $20,400 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $102,000 $10,824 $510,000 $10,200 Project: 371120- Type Work: Replace Bridge Descp:CR 7/WALTER WELLS ROAD @ SHOAL CREEK NW TAZEWELL CL Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $81,600 $0 $408,000 $8,160 State $20,400 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $102,000 $10,824 $510,000 $10,200 Project: M005018 Type Work: Resurface & Maintenance Descp:SR 240 CONN FROM SR 127 TO SR 240 Length: 1.92 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 177,005 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $141,604 State $35,401 Other $0 Total $177,005 Project: M005074 Type Work: Resurface & Maintenance Descp:SR 26 FROM CHATTAHOOCHEE COUNTY LINE TO SR 3 Length: 23.27 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,801,340 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $3,841,072 State $960,268 Other $0 Total $4,801,340 Also in Schley County Project: M005176 Type Work: Resurface & Maintenance Descp:SR 137 FROM SR 355 TO SR 41 Length: 8.10 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,427,968 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,142,374 State $285,594 Other $0 Total $1,427,968 261 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005189 Type Work: Resurface & Maintenance Descp:SR 41 FM N OF CS 532/INDUSTRIAL BLVD/MARION TO SR 22/TALBOT Length: 17.61 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,087,313 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,669,850 State $417,463 Other $0 Total $2,087,313 Also in Talbot County Project: M005224 Type Work: Resurface & Maintenance Descp:SR 137 SPUR FROM SR 137 TO SR 355 Length: 1.59 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 139,605 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $111,684 State $27,921 Other $0 Total $139,605 Marion Totals Summary County Summary excludes lump sum projects. Project PI# 0008647 371120- Year 2016 2016 Phase ROW ROW Fund Local Local Federal $0 $0 State $0 $0 Other $10,824 $10,824 Total $10,824 $10,824 $0 $0 $21,649 $21,649 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 262 STATE TRANSPORTATION IMPROVEMENT PROGRAM McDuffie Project: 0007040 Type Work: Replace Bridge Descp:SR 43 @ LITTLE RIVER @ LINCOLN/MCDUFFIE COUNTY LINE Length: 0.65 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,703,109 $0 2 Phase CST UTL Fund Bond STP Year 2015 2015 Federal $0 $311,307 State $8,313,974 $77,827 Other $0 $0 Total $8,313,974 $389,134 Also in Lincoln County Project: 0013258 Type Work: Pedestrian Crossings Descp:SR 4; SR 17 & SR 24 @ 4 LOCS - PEDESTRIAN UPGRADES Length: 1.60 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 636,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $122,400 $450,000 State $13,600 $50,000 Other $0 $0 Total $136,000 $500,000 Also in Burke, Jefferson County Project: 222250- Type Work: Widening Descp:SR 10/SR 17/US 78 FROM SR 43 TO CR 6/SMITH MILL ROAD - TIA Lanes: Exist. 2 Prop. 5 Length: 5.74 Total Project Cost: Total Project Authorizations: Total Parcels: $ 29,460,759 $ 4,344,832 58 Phase PE CST CST UTL Fund NHPP State NHPP NHPP Year 2014 2014 2015 2015 Federal $80,000 $0 $19,653,820 $438,922 State $20,000 $0 $4,913,455 $109,730 Other $0 $4,244,832 $0 $0 Project Details: Provide additional capacity - improve mobility and reduce congestion - enhance economic development - reduce crash frequency - State Freight Network Total $100,000 $4,244,832 $24,567,275 $548,652 Project: 222255- Type Work: Widening Descp:SR 10/SR 17 FM SMITH MILL RD TO WASHINGTON BYP/WILKES - TIA Lanes: Exist. 2 Prop. 4 Length: 12.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 38,105,012 $ 4,125,000 74 Phase PE CST CST UTL Fund NHPP State NHPP NHPP Year 2014 2014 2015 2015 Federal $100,000 $0 $25,534,418 $1,649,592 State $25,000 $0 $6,383,605 $412,398 Other $0 $4,000,000 $0 $0 Total $125,000 $4,000,000 $31,918,023 $2,061,990 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development - Project on GRIP corridor & State Freight Network if on GRIP/FN Also in Wilkes County 263 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 227815- Type Work: Replace Bridge Descp:SR 10/17/US 78 @ HART CREEK 9.5 MI N OF THOMSON Length: 0.23 Total Project Cost: Total Project Authorizations: Total Parcels: $ 649,315 $ 10,000 0 Phase PE CST Fund Bridge NHPP Year 2014 2015 Federal $8,000 $511,452 State $2,000 $127,863 Other $0 $0 Total $10,000 $639,315 Project: 227816- Type Work: Replace Bridge Descp:SR 10/US 78 @ BIG CREEK 8 MI N OF THOMSON Length: 0.24 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,451,834 $ 5,000 0 Phase PE CST Fund Bridge NHPP Year 2014 2015 Federal $4,000 $1,957,467 State $1,000 $489,367 Other $0 $0 Total $5,000 $2,446,834 Project: M004920 Type Work: Resurface & Maintenance Descp:I-20 FROM SR 44/GREENE TO SR10/SR 17/MCDUFFIE Length: 41.95 Phase CST Fund NHPP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,191,045 $ 8,191,045 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Project: M005040 Type Work: Resurface & Maintenance Descp:SR 12 FROM WARREN COUNTY LINE TO SR 10 Length: 5.90 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 367,904 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $7,371,941 Federal $294,323 State $819,105 Other $0 Total $8,191,045 Also in Greene, Taliaferro, Warren County State $73,581 Other $0 Total $367,904 Project: M005042 Type Work: Resurface & Maintenance Descp:SR 17 FROM JEFFERSON COUNTY LINE TO SR 12 Length: 13.60 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,089,664 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,671,731 State $417,933 Other $0 Total $2,089,664 Also in Warren County 264 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005108 Type Work: Bridges Descp:SR 22 @ 2 LOCS IN BALDWIN CO & SR 150 @ 1 LOC IN MCDUFFIE CO Length: 1.20 Phase PE CST Fund STP STP Year 2014 LUMP Federal $128,000 $600,000 State $32,000 $150,000 Other $0 $0 Total $160,000 $750,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 910,000 $ 160,000 0 Project Details: Substructure strengthening - deck rehab painting - joint replacement and co-polymer overlay Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Also in Baldwin County Project: M005196 Type Work: Resurface & Maintenance Descp:I-20 FROM SR 10/MCDUFFIE TO SR 383/COLUMBIA Length: 21.84 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 20,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $18,000 State $2,000 Other $0 Total $20,000 Also in Columbia County McDuffie Totals Summary County Summary excludes lump sum projects. Project PI# 0007040 0007040 222250222250222255222255227815227816- Year 2015 2015 2015 2015 2015 2015 2015 2015 Phase CST UTL CST UTL CST UTL CST CST Fund Bond STP NHPP NHPP NHPP NHPP NHPP NHPP Federal $0 $155,654 $19,653,820 $438,922 $6,638,949 $428,894 $511,452 $1,957,467 State $4,156,987 $38,913 $4,913,455 $109,730 $1,659,737 $107,223 $127,863 $489,367 Other $0 $0 $0 $0 $0 $0 $0 $0 Total $4,156,987 $194,567 $24,567,275 $548,652 $8,298,686 $536,117 $639,315 $2,446,834 $29,785,156 $11,603,276 $0 $41,388,433 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 265 STATE TRANSPORTATION IMPROVEMENT PROGRAM McIntosh Project: 0010594 Type Work: TE-Bike/Ped Facility Descp:SR 25 FROM SR 251 TO DARIEN RIVER Length: 1.53 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 187,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $150,000 State $0 Other $37,500 Total $187,500 Project: 0011713 Type Work: Lighting Descp:I-95 @ SR 57/SR 99 - INTERCHANGE LIGHTING Length: 0.80 Phase PE CST Fund NHPP NHPP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,458,600 $0 0 Uses Lump Sum Bank: INTERCHANGE/ROADWAY LIGHTING FOR FY 2015 - FY 2018 Federal $146,880 $1,020,000 State $36,720 $255,000 Other $0 $0 Total $183,600 $1,275,000 Project: M004628 Type Work: Resurface & Maintenance Descp:SR 25 FM SOUTH ALTAMAHA RIVER/GLYNN TO N OF SR 251/MCINTOSH Length: 4.59 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,008,620 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $806,896 State $201,724 Other $0 Total $1,008,620 Also in Glynn County 266 STATE TRANSPORTATION IMPROVEMENT PROGRAM Meriwether Project: 0007043 Type Work: Replace Bridge Descp:SR 18 @ CSX RR Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,802,609 $ 554,628 0 Phase PE ROW CST UTL Fund Bridge STP STP STP Year 2014 2017 After 2018 After 2018 Federal $443,702 $139,192 $6,123,540 $335,653 State $110,926 $34,798 $1,530,885 $83,913 Other $0 $0 $0 $0 Total $554,628 $173,990 $7,654,426 $419,566 Project: 0007044 Type Work: Replace Bridge Descp:SR 85 @ CS 081117 LANE STREET IN MANCHESTER Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,639,713 $0 0 Phase PE ROW CST UTL Fund STP STP STP STP Year 2016 2018 After 2018 After 2018 Federal $645,436 $170,371 $8,733,013 $562,950 State $161,359 $42,593 $2,183,253 $140,738 Other $0 $0 $0 $0 Total $806,795 $212,964 $10,916,266 $703,688 Project: 0010414 Type Work: Replace Bridge Descp:SR 109 SPUR @ RED OAK CREEK 2 MI SW OF GAY Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,531,407 $0 4 Project Details: In State Freight Network. Phase ROW CST UTL Fund STP STP STP Year 2016 2017 2017 Federal $102,375 $1,114,261 $8,490 State $25,594 $278,565 $2,122 Other $0 $0 $0 Total $127,969 $1,392,826 $10,612 Project: 0010618 Type Work: Bicycle/Ped. Facility Descp:SR 18 SO/SR 41 SO; SR 109 & CS 799/DEPOT ST @ 3 LOCS - PH II Length: 0.18 Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 0 Phase CST Fund State Year 2015 Federal $0 State $375,000 Other $0 Total $375,000 Project: M005138 Type Work: Resurface & Maintenance Descp:SR 41 FROM SR 85 TO SR 18 Length: 11.44 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,559,572 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $3,647,658 State $911,914 Other $0 Total $4,559,572 267 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005157 Type Work: Resurface & Maintenance Descp:SR 85 ALT FROM TALBOT COUNTY LINE TO SR 41 Phase CST Length: 3.90 Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,434,841 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,147,873 State $286,968 Other $0 Total $1,434,841 Meriwether Totals Summary County Summary excludes lump sum projects. Project PI# 0007043 0007044 0007044 0010414 0010414 0010414 0010618 Year 2017 2016 2018 2016 2017 2017 2015 Phase ROW PE ROW ROW CST UTL CST Fund STP STP STP STP STP STP State Federal $139,192 $645,436 $170,371 $102,375 $1,114,261 $8,490 $0 State $34,798 $161,359 $42,593 $25,594 $278,565 $2,122 $375,000 Other $0 $0 $0 $0 $0 $0 $0 Total $173,990 $806,795 $212,964 $127,969 $1,392,826 $10,612 $375,000 $2,180,126 $920,031 $0 $3,100,157 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 268 STATE TRANSPORTATION IMPROVEMENT PROGRAM Miller Project: 0008667 Type Work: Drainage Improvements Descp:SR 1 @ 1 LOC & CS 500/CUTHBERT ST @ 1 LOC Length: 0.68 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,301,704 $ 460,000 19 Phase ROW CST UTL Fund NHPP NHPP NHPP Year 2014 2015 2015 Federal $368,000 $632,155 $41,208 State $92,000 $158,039 $10,302 Other $0 $0 $0 Total $460,000 $790,194 $51,510 Project: 0009111 Type Work: TE-Bike/Ped Facility Descp:MILFORD STREET/PHILLIPSBURG ROAD SIDEWALKS/WALKING LANE Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $400,000 State $0 Other $100,000 Total $500,000 Project: M005168 Type Work: Resurface & Maintenance Descp:SR 1 FM 1.15 MI S OF CS 540/BROOKS ST TO 0.20 MI N OF SR 91 Length: 3.80 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 867,457 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $693,966 State $173,491 Other $0 Total $867,457 Project: M005193 Type Work: Resurface & Maintenance Descp:SR 1 FROM DECATUR COUNTY LINE TO N OF CR 48/MIDDLETON ROAD Length: 6.00 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 818,415 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $654,732 State $163,683 Other $0 Total $818,415 Miller Totals Summary County Summary excludes lump sum projects. Project PI# Year Phase Fund Federal State Other Total 0008667 0008667 2015 CST 2015 UTL NHPP NHPP $632,155 $41,208 $158,039 $10,302 $0 $790,194 $0 $51,510 $673,363 $168,341 $0 $841,704 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 269 STATE TRANSPORTATION IMPROVEMENT PROGRAM Mitchell Project: 0001570 Type Work: Turn Lanes Descp:SR 3/US 19 FROM CR 219/SUNSET DRIVE TO CR 159/BIG CREEK ROAD Length: 21.31 Phase CST Fund NHPP Year 2018 Federal $11,004,185 State $2,751,046 Other $0 Total $13,755,232 Total Project Cost: Total Project Authorizations: Total Parcels: $ 13,755,232 $0 0 Project Details: Project will improve the capacity and operations of the intersection to enhance mobility. On GRIP Network Also in Thomas County Project: 0008446 Type Work: Replace Bridge Descp:CR 133/STAGE COACH ROAD @ LITTLE CREEK Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 820,404 $ 300,000 3 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $400,000 $8,000 State $60,000 $0 $100,000 $2,000 Other $0 $10,404 $0 $0 Total $300,000 $10,404 $500,000 $10,000 Project: 0010611 Type Work: TE-Bike/Ped Facility Descp:SR 93; CR 305/E RAILROAD ST & CS 704/W RAILROAD ST @ 3 LOCS Length: 0.94 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 312,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $250,000 State $0 Other $62,500 Total $312,500 Project: M004963 Type Work: Resurface & Maintenance Descp:SR 3 FROM THOMAS COUNTY LINE TO DOUGHERTY COUNTY LINE Length: 29.34 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,348,919 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,679,135 State $669,784 Other $0 Total $3,348,919 270 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005028 Type Work: Resurface & Maintenance Descp:SR 93 FROM GRADY COUNTY LINE TO SR 3 Length: 33.94 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,257,857 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $5,006,286 State $1,251,571 Other $0 Total $6,257,857 Project: M005078 Type Work: Resurface & Maintenance Descp:SR 37 FROM E OF CAMILLA CITY LIMITS TO CR 23/PINECLIFF ROAD Length: 4.50 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,126,035 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $900,828 State $225,207 Other $0 Total $1,126,035 Project: M005220 Type Work: Resurface & Maintenance Descp:SR 112 FROM SR 3 TO WORTH COUNTY LINE Length: 16.49 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,737,386 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,389,909 State $347,477 Other $0 Total $1,737,386 Project: M005221 Type Work: Resurface & Maintenance Descp:SR 37 FROM BAKER COUNTY LINE TO CAMILLA CITY LIMITS Length: 6.74 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,420,253 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,136,202 State $284,051 Other $0 Total $1,420,253 Mitchell Totals Summary County Summary excludes lump sum projects. Project PI# 0001570 0008446 Year 2018 2016 Phase CST ROW Fund NHPP Local Federal $330,126 $0 State $82,531 $0 Other $0 $10,404 Total $412,657 $10,404 $330,126 $82,531 $10,404 $423,061 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 271 STATE TRANSPORTATION IMPROVEMENT PROGRAM Monroe Project: 0007046 Type Work: Replace Bridge Descp:SR 83 @ TOWALIGA RIVER Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,826,376 $ 517,532 4 Phase PE ROW CST UTL Fund STP STP STP STP Year 2014 2016 After 2018 After 2018 Federal $414,025 $81,878 $4,629,544 $335,653 State $103,506 $20,470 $1,157,386 $83,913 Other $0 $0 $0 $0 Total $517,532 $102,348 $5,786,931 $419,566 Project: 0008884 Type Work: Roundabout Descp:SR 18 @ SR 87 Length: 0.18 Phase ROW CST UTL Fund Safety Safety Safety Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,271,893 $ 230,000 4 Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018 Year 2014 LUMP LUMP Federal $230,000 $1,765,893 $276,000 State $0 $0 $0 Other $0 $0 $0 Total $230,000 $1,765,893 $276,000 Project: 0009336 Type Work: RRX Consolidation Descp:INDIAN SPRINGS RD CROSSOVER @NS #718327K &RR AVE@NS #718328S Length: 0.04 Phase CST Fund HSIP Year LUMP Federal $16,236 Total Project Cost: Total Project Authorizations: Total Parcels: $ 16,236 $0 0 Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018 State $0 Other $0 Total $16,236 Project: 0010304 Type Work: TE-Bike/Ped Facility Descp:CR 271/TIFT COLLEGE DR FM SR 42/SR 83 TO CR 290/PATROL RD Length: 0.78 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 750,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $600,000 State $0 Other $150,000 Total $750,000 Project: 0013046 Type Work: RRX Warning Device Descp:CS 625/INDIAN SPRINGS ROAD CROSSOVER @ NS #718329Y Length: 0.04 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 255,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $5,000 $250,000 State $0 $0 Other $0 $0 Total $5,000 $250,000 272 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013100 Type Work: RRX Warning Device Descp:CR 35/OLD MACON ROAD @ NS #718346P Length: 0.20 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 260,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $260,000 State $0 Other $0 Total $260,000 Project: 0013117 Type Work: RRX Warning Device Descp:CR 34/RUMBLE ROAD @ NS #718345H Length: 0.20 Phase PE CST Fund HSIP HSIP Year LUMP LUMP Federal $25,000 $250,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 275,000 $0 0 Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018 State $0 $0 Other $0 $0 Total $25,000 $250,000 Project: M004519 Type Work: Signing Descp:I-475 @ 5 LOCS - SIGN UPGRADES Length: 2.00 Phase PE CST Fund NHPP NHPP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,919,222 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $40,000 $2,879,222 State $0 $0 Other $0 $0 Total $40,000 $2,879,222 Also in Bibb County Project: M004615 Type Work: Resurface & Maintenance Descp:SR 19 FROM BIBB COUNTY LINE TO SE OF SR 18 Phase CST Length: 12.84 Fund STP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,754,021 $ 2,754,021 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,203,217 State $550,804 Other $0 Total $2,754,021 Project: M005001 Type Work: Resurface & Maintenance Descp:SR 18 FROM E BARNESVILLE BYPASS/LAMAR TO W OF SR 83/MONROE Length: 10.75 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,164,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $931,200 State $232,800 Other $0 Total $1,164,000 Also in Lamar County 273 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005205 Type Work: Resurface & Maintenance Descp:SR 74 FROM SR 42 TO BIBB COUNTY LINE Length: 8.66 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 912,417 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $729,934 State $182,483 Other $0 Total $912,417 Project: M005217 Type Work: Resurface & Maintenance Descp:SR 74 FROM SR 7 TO SR 42 Length: 6.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 653,232 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $522,586 State $130,646 Other $0 Total $653,232 Monroe Totals Summary County Summary excludes lump sum projects. Project PI# 0007046 Year 2016 Phase ROW Fund STP Federal $81,878 State $20,470 Other $0 Total $102,348 $81,878 $20,470 $0 $102,348 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 274 STATE TRANSPORTATION IMPROVEMENT PROGRAM Montgomery Project: 0007037 Type Work: Replace Bridge Descp:SR 135 @ ALTAMAHA RIVER - TIA Length: 0.60 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,441,627 $ 1,740,833 0 Phase PE ROW CST CST Fund STP STP State STP Year 2017 2017 2014 After 2018 Federal $8,000 $42,448 $0 $5,310,187 State $2,000 $10,612 $0 $1,327,547 Other $0 $0 $1,740,833 $0 Total $10,000 $53,060 $1,740,833 $6,637,734 Also in Jeff Davis County Project: M005030 Type Work: Resurface & Maintenance Descp:SR 130 FROM SR 135/MONTGOMERY TO SR 30/TOOMBS Length: 6.07 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 574,142 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $459,313 State $114,828 Other $0 Total $574,142 Also in Toombs County Montgomery Totals Summary County Summary excludes lump sum projects. Project PI# 0007037 0007037 Year 2017 2017 Phase PE ROW Fund STP STP Federal $4,000 $21,224 State $1,000 $5,306 Other $0 $0 Total $5,000 $26,530 $25,224 $6,306 $0 $31,530 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 275 STATE TRANSPORTATION IMPROVEMENT PROGRAM Morgan Project: 0009832 Type Work: Roundabout Descp:SR 24 BYPASS @ CR 252/BETHANY ROAD Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 220,816 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $220,816 State $0 Other $0 Total $220,816 Project: 0010345 Type Work: TE-Bike/Ped Facility Descp:BOSTWICK STREETSCAPE - PHASE II Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 125,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $100,000 State $0 Other $25,000 Total $125,000 Project: 0013198 Type Work: Signals Descp:SR 11;SR 24;SR 24BY;SR 36 & SR 81 @ 8 LOCS SIGNAL UPGRADES Length: 3.00 Phase PE ROW CST Fund STP STP STP Year LUMP LUMP LUMP Federal $290,000 $230,000 $1,250,000 State $0 $0 $0 Other $0 $0 $0 Total $290,000 $230,000 $1,250,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,770,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Also in Newton County Project: 0013246 Type Work: RRX Warning Device Descp:CS 603/LIONS CLUB ROAD @ MRSC #733144E IN MADISON Length: 0.40 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 210,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $10,000 $200,000 State $0 $0 Other $0 $0 Total $10,000 $200,000 276 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013259 Type Work: Pedestrian Crossings Descp:SR 12; SR 15; SR 24 BYP; SR 36 &SR 162 @5 LOC - PED UPGRADES Length: 2.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 795,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $153,000 $562,500 State $17,000 $62,500 Other $0 $0 Total $170,000 $625,000 Also in Greene, Newton, Taliaferro County Project: 222560- Type Work: Widening Descp:SR 24/US 441 FM MADISON BYP TO JUST N OF APALACHEE RIV/OCONE Lanes: Exist. 2 Prop. 4 Length: 7.92 Phase ROW CST Fund NHPP NHPP Year 2018 After 2018 Federal $9,755,017 $40,755,853 State $2,438,754 $10,188,963 Other $0 $0 Total $12,193,772 $50,944,816 Total Project Cost: Total Project Authorizations: Total Parcels: $ 63,138,588 $0 75 Project Details: Widen 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Also in Oconee County Project: 222570- Type Work: Widening Descp:SR 24/US 441 FM PUTNAM COUNTY TO N OF CR 121/PIERCE DAIRY RD Lanes: Exist. 2 Prop. 4 Length: 8.10 Phase PE ROW CST Fund NHPP NHPP NHPP Year Federal 2015 $40,000 2016 $6,029,359 After 2018 $25,921,087 State $10,000 $1,507,340 $6,480,272 Total Project Cost: Total Project Authorizations: Total Parcels: $ 39,988,058 $0 90 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Project: M004936 Type Work: Resurface & Maintenance Descp:SR 24 FROM PUTNAM COUNTY LINE TO I-20 Length: 8.05 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,221,245 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,776,996 State $444,249 Other $0 $0 $0 Total $50,000 $7,536,699 $32,401,359 Other $0 Total $2,221,245 277 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005197 Type Work: Resurface & Maintenance Descp:I-20 FROM NS #733146T/MORGAN TO SR 44/GREENE Length: 16.84 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 20,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $18,000 State $2,000 Other $0 Total $20,000 Also in Greene County Morgan Totals Summary County Summary excludes lump sum projects. Project PI# 222560222570222570- Year 2018 2015 2016 Phase ROW PE ROW Fund NHPP NHPP NHPP Federal $9,267,267 $40,000 $6,029,359 State $2,316,817 $10,000 $1,507,340 Other $0 $0 $0 Total $11,584,083 $50,000 $7,536,699 $15,336,626 $3,834,156 $0 $19,170,782 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 278 STATE TRANSPORTATION IMPROVEMENT PROGRAM Murray Project: 0006064 Type Work: Turn Lanes Descp:SR 286 @ COBB ROAD AND @ TOM GREGORY ROAD Length: 0.80 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,553,119 $0 0 Phase PE ROW CST UTL Fund STP STP STP STP Year 2015 2018 After 2018 After 2018 Federal $84,897 $340,744 $225,360 $591,495 Project Details: Project will improve the capacity and operations of the intersection to enhance mobility. State $21,224 $85,186 $56,340 $147,874 Other $0 $0 $0 $0 Project: 0007047 Type Work: Replace Bridge Descp:SR 52 ALT @ TOWN BRANCH Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 425,708 $0 0 Phase PE ROW CST Fund STP STP STP Year 2015 2017 After 2018 Federal $160,000 $50,730 $129,837 State $40,000 $12,682 $32,459 Other $0 $0 $0 Total $106,121 $425,930 $281,699 $739,369 Total $200,000 $63,412 $162,296 Project: 0009620 Type Work: Roundabout Descp:SR 225 @ CR 132/MT CARMEL CHURCH ROAD/MITCHELL BRIDGE ROAD Length: 0.30 Phase ROW CST UTL Fund HSIP HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,081,024 $0 7 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP LUMP Federal $426,360 $1,617,944 $36,720 State $0 $0 $0 Other $0 $0 $0 Total $426,360 $1,617,944 $36,720 Project: 0010494 Type Work: Signing Descp:CR 34 FM CS 621 TO SR 52 & CR 106/109 FM SR 225 TO WHITFIELD Length: 3.68 Phase PE CST Fund Safety Safety Total Project Cost: Total Project Authorizations: Total Parcels: $ 35,000 $0 0 Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $10,000 $25,000 State $0 $0 Other $0 $0 Total $10,000 $25,000 Project: 0011686 Type Work: Replace Bridge Descp:SR 61 @ CSX #340636X 7.9 MI N OF CRANDALL Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,971,722 $0 5 Phase ROW CST UTL Fund STP STP STP Year 2016 2017 2017 Federal $848,134 $1,460,583 $68,660 State $212,034 $365,146 $17,165 Other $0 $0 $0 Total $1,060,168 $1,825,729 $85,825 279 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 631550- Type Work: New Construction Descp:SR 225 BYP FM CR 105/IMPERIAL BLVD TO SR 52/US 76 Lanes: Exist. 0 Prop. 2 Length: 2.90 Phase ROW CST UTL Fund STP STP STP Year 2017 After 2018 After 2018 Federal $8,716,610 $7,916,294 $1,902,863 State $2,179,152 $1,979,074 $475,716 Total Project Cost: Total Project Authorizations: Total Parcels: $ 23,169,709 $0 54 Project Details: Will improve mobility and connectivity - enhance economic development Other $0 $0 $0 Total $10,895,762 $9,895,368 $2,378,579 Project: M004909 Type Work: Resurface & Maintenance Descp:SR 2 FROM SR 61 TO 0.50 MI S OF CR 166/DEWBERRY CHURCH RD Length: 6.90 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,815,754 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,452,603 State $363,151 Other $0 Total $1,815,754 Murray Totals Summary County Summary excludes lump sum projects. Project PI# 0006064 0006064 0007047 0007047 0011686 0011686 0011686 631550- Year 2015 2018 2015 2017 2016 2017 2017 2017 Phase PE ROW PE ROW ROW CST UTL ROW Fund STP STP STP STP STP STP STP STP Federal $84,897 $340,744 $160,000 $50,730 $848,134 $1,460,583 $68,660 $8,716,610 State $21,224 $85,186 $40,000 $12,682 $212,034 $365,146 $17,165 $2,179,152 Other $0 $0 $0 $0 $0 $0 $0 $0 Total $106,121 $425,930 $200,000 $63,412 $1,060,168 $1,825,729 $85,825 $10,895,762 $11,730,357 $2,932,589 $0 $14,662,946 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 280 STATE TRANSPORTATION IMPROVEMENT PROGRAM Newton Project: 0004444 Type Work: Guardrail Descp:SR 212 @ LAKE JACKSON GUARDRAIL @ APPROACHES Length: 0.40 Phase ROW CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 348,145 $0 6 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $179,046 $169,099 State $0 $0 Other $0 $0 Total $179,046 $169,099 Also in Jasper County Project: 0007049 Type Work: Replace Bridge Descp:SR 36 @ YELLOW RIVER 14 MI S OF COVINGTON Length: 0.50 Phase ROW CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,804,764 $0 5 Fund STP STP Year 2015 2016 Federal $290,496 $3,553,315 State $72,624 $888,329 Other $0 $0 Total $363,120 $4,441,644 Project: 0007592 Type Work: Sidewalks Descp:YELLOW RIVER MULTI-USE TRAIL IN NEWTON COUNTY Length: 2.36 Total Project Cost: Total Project Authorizations: Total Parcels: $ 909,000 $0 11 Phase CST Fund HPP Year 2017 Federal $524,925 State $0 Other $384,075 Total $909,000 Project: 0009928 Type Work: Roundabout Descp:SR 11 @ SR 142 Length: 0.12 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,320,067 $ 400,000 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $400,000 $920,067 State $0 $0 Other $0 $0 Total $400,000 $920,067 Project: 0013198 Type Work: Signals Descp:SR 11;SR 24;SR 24BY;SR 36 & SR 81 @ 8 LOCS SIGNAL UPGRADES Length: 3.00 Phase PE ROW CST Fund STP STP STP Year LUMP LUMP LUMP Federal $290,000 $230,000 $1,250,000 State $0 $0 $0 Other $0 $0 $0 Total $290,000 $230,000 $1,250,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,770,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Also in Morgan County 281 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013259 Type Work: Pedestrian Crossings Descp:SR 12; SR 15; SR 24 BYP; SR 36 &SR 162 @5 LOC - PED UPGRADES Length: 2.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 795,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $153,000 $562,500 State $17,000 $62,500 Other $0 $0 Total $170,000 $625,000 Also in Greene, Morgan, Taliaferro County Project: 231630- Type Work: Widening Descp:SR 12/US 278 FM COVINGTON CITY LIMITS TO E OF SR 142 Lanes: Exist. 2 Prop. 4 Length: 2.46 Phase PE ROW CST Fund STP STP STP Year 2014 2014 2018 Federal $160,000 $1,264,000 $7,319,402 State $40,000 $316,000 $1,829,851 Total Project Cost: Total Project Authorizations: Total Parcels: $ 10,929,253 $ 1,780,000 56 Project Details: Widen from 2 to 4 lanes - improve operation and mobility - reduce congestion - enhance economic development - reduce crash frequency. Other $0 $0 $0 Total $200,000 $1,580,000 $9,149,253 Project: 242230- Type Work: Widening Descp:SR 142 FM I-20 TO ALCOVY RD IN COVINGTON Lanes: Exist. 2 Prop. 4 Length: 1.70 Phase PE CST UTL Fund NHPP NHPP NHPP Year 2015 2016 2016 Federal $40,000 $9,366,675 $1,116,349 State $10,000 $2,341,669 $279,087 Total Project Cost: Total Project Authorizations: Total Parcels: $ 13,153,781 $0 37 Project Details: widen fm 2 to 4 lanes- replace bridge over CSX RR on SR 142- additional capacity- improve mobility and reduce congestion- enhance economic development- reduce crash frequency Other $0 $0 $0 Total $50,000 $11,708,344 $1,395,437 Project: M004708 Type Work: Resurface & Maintenance Descp:SR 36 FROM BUTTS COUNTY LINE TO CR 653/COVINGTON BYPASS ROAD Length: 13.72 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,049,937 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA GT 200K FOR FY 2015 - FY 2018 Federal $2,439,950 State $609,987 Other $0 Total $3,049,937 282 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005102 Type Work: Resurface & Maintenance Descp:SR 142 FROM W OF CS 1044/ALCOVY ROAD TO SR 81 Length: 3.45 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 827,947 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $662,358 State $165,589 Other $0 Total $827,947 Project: M005142 Type Work: Resurface & Maintenance Descp:SR 12 FROM SR 142 TO MORGAN COUNTY LINE Length: 9.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 979,848 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $783,878 State $195,970 Other $0 Total $979,848 Also in Walton County Project: T004087 Type Work: Transit Projects Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 199,764 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2015 Federal $159,811 State $0 Other $39,953 Total $199,764 Project: T004407 Type Work: Transit Projects Descp:FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 200,000 $0 0 Phase Fund CST Transit Year 2016 Federal $160,000 State $0 Other $40,000 Total $200,000 Project: T004864 Type Work: Transit Projects Descp:FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 240,000 $0 0 Phase Fund CST Transit Year 2017 Federal $192,000 State $0 Other $48,000 Total $240,000 283 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project PI# 0007049 0007049 0007592 231630242230242230242230T004087 T004407 T004864 Year 2015 2016 2017 2018 2015 2016 2016 2015 2016 2017 Newton Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Phase Fund Federal State Other ROW CST CST CST PE CST UTL CST CST CST STP STP HPP STP NHPP NHPP NHPP Transit Transit Transit $290,496 $3,553,315 $524,925 $7,319,402 $40,000 $9,366,675 $1,116,349 $159,811 $160,000 $192,000 $72,624 $888,329 $0 $1,829,851 $10,000 $2,341,669 $279,087 $0 $0 $0 $0 $0 $384,075 $0 $0 $0 $0 $39,953 $40,000 $48,000 Total $363,120 $4,441,644 $909,000 $9,149,253 $50,000 $11,708,344 $1,395,437 $199,764 $200,000 $240,000 $22,722,975 $5,421,560 $512,028 $28,656,562 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 284 STATE TRANSPORTATION IMPROVEMENT PROGRAM Oconee Project: 122660- Type Work: Widening Descp:SR 24/US 441 FM N OF APALACHEE RIVER TO WATKINSVILLE BP Lanes: Exist. 2 Prop. 4 Length: 8.70 Phase PE ROW CST Fund NHPP NHPP NHPP Year 2015 After 2018 After 2018 Federal $800,000 $12,522,926 $42,468,435 State $200,000 $3,130,732 $10,617,109 Total Project Cost: Total Project Authorizations: Total Parcels: $ 69,739,201 $0 100 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Other $0 $0 $0 Total $1,000,000 $15,653,658 $53,085,543 Project: 222560- Type Work: Widening Descp:SR 24/US 441 FM MADISON BYP TO JUST N OF APALACHEE RIV/OCONE Lanes: Exist. 2 Prop. 4 Length: 7.92 Phase ROW CST Fund NHPP NHPP Year 2018 After 2018 Federal $9,755,017 $40,755,853 State $2,438,754 $10,188,963 Other $0 $0 Total $12,193,772 $50,944,816 Total Project Cost: Total Project Authorizations: Total Parcels: $ 63,138,588 $0 75 Project Details: Widen 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Also in Morgan County Project: M005178 Type Work: Resurface & Maintenance Descp:SR 24 FM MORGAN COUNTY TO 0.10 MI N OF CR 107/THOMAS FARM RD Length: 9.40 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,408,489 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,926,791 State $481,698 Other $0 Total $2,408,489 Project PI# 122660222560- Year 2015 2018 Oconee Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Phase Fund Federal State Other PE NHPP $800,000 $200,000 $0 ROW NHPP $487,751 $121,938 $0 Total $1,000,000 $609,689 $1,287,751 $321,938 $0 $1,609,689 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 285 STATE TRANSPORTATION IMPROVEMENT PROGRAM Oglethorpe Project: 222460- Type Work: Passing Lanes Descp:SR 10:OGLETHORPE 13.7-15;15.3-16.2 &WILKES 0-1.5;5.5-7.0-TIA Lanes: Exist. 2 Prop. 3 Length: 5.32 Phase PE ROW CST Fund State State NHPP Year 2014 2014 2015 Federal $0 $0 $5,082,748 State $0 $0 $1,270,687 Other $100,000 $100,000 $0 Total $100,000 $100,000 $6,353,435 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,553,435 $ 200,000 60 Project Details: Construct 4 passing lane sections - Passing opportunity improvements to address operational & safety issues Also in Wilkes County Project: M005056 Type Work: Resurface & Maintenance Descp:SR 10 FROM CLARKE COUNTY LINE TO WILKES COUNTY LINE Length: 18.56 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,125,532 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $3,300,426 State $825,106 Other $0 Total $4,125,532 Oglethorpe Totals Summary County Summary excludes lump sum projects. Project PI# 222460- Year 2015 Phase CST Fund NHPP Federal $2,134,754 State $533,689 Other $0 Total $2,668,443 $2,134,754 $533,689 $0 $2,668,443 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 286 STATE TRANSPORTATION IMPROVEMENT PROGRAM Peach Project: 0008189 Type Work: TE-Historic Preservation Descp:FORT VALLEY FREIGHT DEPOT REHABILITATION IN PEACH COUNTY Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,070,265 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $856,212 State $0 Other $214,053 Total $1,070,265 Project: 0010604 Type Work: TE-Bike/Ped Facility Descp:FORT VALLEY STATE UNIVERSITY PEDESTRIAN IMPROVEMENTS Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $300,000 State $0 Other $75,000 Total $375,000 Project: 0012838 Type Work: RRX Warning Device Descp:CS 617/TULIP DRIVE @ GSR #718515A IN FORT VALLEY Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 220,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $220,000 State $0 Other $0 Total $220,000 Project: M004961 Type Work: Resurface & Maintenance Descp:SR 49 FROM SR 7 TO 0.15 MI N OF CR 278/ALEXANDER WAY Length: 2.74 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 625,482 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $500,386 State $125,096 Other $0 Total $625,482 287 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004989 Type Work: Resurface & Maintenance Descp:SR 7 FROM CS 772/MASON TERRACE/HOUSTON TO SR 49/PEACH Length: 11.03 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,324,242 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,859,394 State $464,848 Other $0 Total $2,324,242 Also in Houston County 288 STATE TRANSPORTATION IMPROVEMENT PROGRAM Pickens Project: 0006416 Type Work: Realignment Descp:SR 53 FM E OF CR 269/RYO MOUNTAIN RD TO W OF CR 178/DAVIS RD Length: 1.50 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,985,881 $0 28 Phase PE ROW CST UTL Fund HSIP HSIP HSIP HSIP Year LUMP LUMP LUMP LUMP Federal $35,100 $2,952,000 $8,161,303 $538,889 State $3,900 $328,000 $906,811 $59,877 Other $0 $0 $0 $0 Total $39,000 $3,280,000 $9,068,115 $598,766 Project Details: Realignment bring horizontal and vertical curves up to current standards add shoulders decrease frequency of crashes Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Also in Gordon County Project: 0008043 Type Work: Acceleration / Decel Lane Descp:SR 515/US 76 @ CR 250/ANTIOCH CHURCH ROAD Length: 1.10 Phase ROW CST Fund NHPP NHPP Year 2017 After 2018 Federal $210,876 $810,680 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,276,945 $0 7 Project Details: Project will improve the capacity and operations of the intersection to enhance mobility. State $52,719 $202,670 Other $0 $0 Total $263,595 $1,013,350 Project: 0008314 Type Work: Realignment Descp:SR 136 FROM SR 136 CONN TO SR 515 Length: 2.68 Phase ROW CST Fund HSIP HSIP Year LUMP LUMP Federal $1,675,800 $4,990,562 State $186,200 $554,507 Total Project Cost: Total Project Authorizations: Total Parcels: $ 7,407,068 $0 25 Project Details: Realignment improve horizontal alignment decrease frequency of crashes add bike friendly paved shoulders Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Other $0 $0 Total $1,862,000 $5,545,068 Project: 0009889 Type Work: Roundabout Descp:SR 53 @ SR 53BU Length: 0.25 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,104,081 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $165,612 $938,469 State $0 $0 Other $0 $0 Total $165,612 $938,469 289 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0010769 Type Work: RRX Warning Device Descp:SR 53 @ GNR #340856T IN TATE Length: 0.40 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 209,100 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $5,100 $204,000 State $0 $0 Other $0 $0 Total $5,100 $204,000 Project: 0013110 Type Work: Signals Descp:SR 52 @ 1 LOC; SR 53BU @ 2 LOCS & SR 515 @ 1 LOC Length: 1.60 Phase PE ROW CST Fund STP STP STP Year LUMP LUMP LUMP Federal $100,000 $80,000 $312,000 State $25,000 $20,000 $78,000 Other $0 $0 $0 Total $125,000 $100,000 $390,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 615,000 $0 0 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Also in Fannin, Gilmer County Project: 621490- Type Work: Widening Descp:SR 53BU FM SR 515/APD TO CR 243/INDUSTRIAL BLVD Lanes: Exist. 2 Prop. 4 Length: 2.60 Total Project Cost: Total Project Authorizations: Total Parcels: $ 26,206,371 $ 450,000 38 Phase PE ROW CST UTL Fund STP NHPP NHPP NHPP Year Federal 2014 $360,000 2017 $8,502,721 After 2018 $10,774,405 After 2018 $1,327,971 State $90,000 $2,125,680 $2,693,601 $331,993 Project Details: Widen from 2 to 4 lanes with raised median reduce congestion and crash frequency Other $0 $0 $0 $0 Total $450,000 $10,628,401 $13,468,006 $1,659,963 Project: 621595- Type Work: Passing Lanes Descp:SR 53 FM E OF CR 36/OLD MILL WHITE RD TO E OF STEVE TATE RD Lanes: Exist. 2 Prop. 3 Length: 2.30 Phase ROW CST UTL Fund NHPP NHPP Local Year 2016 After 2018 After 2018 Federal $935,221 $1,237,109 $0 State $233,805 $309,277 $0 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,752,171 $0 26 Project Details: Project will improve passing opportunities along the corridor for motorist and address operational and safety issues at key locations. Project: M003372 Type Work: Miscellaneous Improvements Descp:SR 136 @ 2 LOC BTWN CR 305 & CR 224 EMERGENCY SLOPE REPAIR Length: 0.80 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,310,650 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,048,520 State $262,130 Other $0 $0 $36,758 Other $0 Total $1,169,027 $1,546,386 $36,758 Total $1,310,650 290 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005128 Type Work: Resurface & Maintenance Descp:SR 53BU FROM SR 515 TO SR 53 Length: 6.45 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,979,882 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,583,906 State $395,976 Other $0 Total $1,979,882 Pickens Totals Summary County Summary excludes lump sum projects. Project PI# 0008043 621490621595- Year 2017 2017 2016 Phase ROW ROW ROW Fund NHPP NHPP NHPP Federal $210,876 $8,502,721 $935,221 State $52,719 $2,125,680 $233,805 Other $0 $0 $0 Total $263,595 $10,628,401 $1,169,027 $9,648,819 $2,412,205 $0 $12,061,023 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 291 STATE TRANSPORTATION IMPROVEMENT PROGRAM Pierce Project: 0010595 Type Work: TE-Bike/Ped Facility Descp:SR 121 @ 1 LOC & CS 624/S CENTRAL AVE @ 1 LOC IN BLACKSHEAR Length: 0.58 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 312,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $250,000 State $0 Other $62,500 Total $312,500 Project: 531340- Type Work: Replace Bridge Descp:CR 305/CR 530 @ BIG SATILLA CREEK & OVERFLOW Length: 0.60 Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,145,751 $ 108,120 1 Phase ROW CST CST UTL Fund Local STP STP Local Year 2014 2016 2016 2016 Federal $0 $1,295,685 $2,630,634 $0 State $0 $0 $657,658 $0 Other $108,120 $323,921 $0 $129,733 Total $108,120 $1,619,606 $3,288,292 $129,733 Also in Appling County Project: 532320- Type Work: Replace Bridge Descp:CR 309 @ LITTLE HURRICANE CREEK 3 MI SE OF BACON COUNTY LINE Length: 0.40 Phase CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,277,814 $0 4 Fund STP Year 2015 Federal $1,822,251 State $0 Other $455,563 Total $2,277,814 Project: M005172 Type Work: Resurface & Maintenance Descp:SR 15 FM BRANTLEY COUNTY LINE TO 0.15 MI N OF CR 8/ARLON RD Length: 21.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,110,621 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $3,288,497 State $822,124 Other $0 Total $4,110,621 292 STATE TRANSPORTATION IMPROVEMENT PROGRAM Pierce Totals Summary County Summary excludes lump sum projects. Project PI# 531340531340531340532320- Year 2016 2016 2016 2015 Phase CST CST UTL CST Fund STP STP Local STP Federal $868,109 $427,576 $0 $1,822,251 State $217,027 $0 $0 $0 Other $0 $106,894 $42,812 $455,563 Total $1,085,136 $534,470 $42,812 $2,277,814 $3,117,937 $217,027 $605,269 $3,940,232 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 293 STATE TRANSPORTATION IMPROVEMENT PROGRAM Pike Project: 0010621 Type Work: TE-Bike/Ped Facility Descp:SR 18; CR 250/E JACKSON; CS 559/ADAMS & CS 560/DUNN @ 4 LOCS Length: 0.45 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $400,000 State $0 Other $100,000 Project: 371130- Type Work: Replace Bridge Descp:CR 5/BUFFINGTON ROAD @ TURNPIKE CREEK 5 MI E OF ZEBULON Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $500,000 Total $300,000 $10,824 $510,000 $10,200 Project: M004980 Type Work: Resurface & Maintenance Descp:SR 3 SO FROM SR 3 TO SR 3 Length: 0.82 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 100,793 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $80,634 State $20,159 Other $0 Total $100,793 Project: M005045 Type Work: Resurface & Maintenance Descp:SR 7 FROM CS 600/REDBUD DRIVE TO CR 322/MEADOVISTA ROAD Length: 14.46 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,564,550 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $5,251,640 State $1,312,910 Other $0 Total $6,564,550 Also in Lamar, Spalding County Project: M005088 Type Work: Resurface & Maintenance Descp:SR 109 FROM SR 18 TO SR 3 Length: 9.98 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,927,754 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,542,203 State $385,551 Other $0 Total $1,927,754 294 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005190 Type Work: Resurface & Maintenance Descp:SR 74 FROM SR 18/PIKE TO POTATO CREEK/UPSON Length: 12.31 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,296,982 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,037,586 State $259,396 Other $0 Total $1,296,982 Also in Upson County Pike Totals Summary County Summary excludes lump sum projects. Project PI# 371130- Year 2016 Phase ROW Fund Local Federal $0 State $0 Other $10,824 Total $10,824 $0 $0 $10,824 $10,824 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 295 STATE TRANSPORTATION IMPROVEMENT PROGRAM Polk Project: 0010495 Type Work: Signing Descp:CR 441 @ 1 LOC; CR 442 @ 1 LOC & CR 444 @ 1 LOC Length: 8.03 Phase PE CST Fund Safety Safety Total Project Cost: Total Project Authorizations: Total Parcels: $ 83,000 $0 0 Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $8,000 $75,000 State $0 $0 Other $0 $0 Total $8,000 $75,000 Project: M005072 Type Work: Resurface & Maintenance Descp:SR 101 FROM N OF CR 507/HOLIDAY DR TO CR 313/DENEY POND RD Length: 10.54 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,751,748 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,401,398 State $350,350 Other $0 Total $1,751,748 Also in Floyd County 296 STATE TRANSPORTATION IMPROVEMENT PROGRAM Pulaski Project: 0005533 Type Work: Replace Bridge Descp:SR 11/US 129 @ BLUFF CREEK 4.7 MILES E OF FINLEYSON Length: 0.49 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,385,372 $0 7 Phase PE ROW CST Fund STP STP STP Year 2018 2016 2018 Federal $8,000 $128,367 $1,771,930 State $2,000 $32,092 $442,983 Other $0 $0 $0 Total $10,000 $160,459 $2,214,913 Project: 0007050 Type Work: Replace Bridge Descp:SR 26 @ OCMULGEE RIVER Length: 0.61 Total Project Cost: Total Project Authorizations: Total Parcels: $ 9,952,888 $0 0 Phase ROW CST UTL Fund NHPP NHPP NHPP Year 2015 2016 2016 Federal $42,448 $6,664,240 $1,255,621 State $10,612 $1,666,060 $313,905 Other $0 $0 $0 Total $53,060 $8,330,300 $1,569,527 Project: 0007585 Type Work: Sidewalks Descp:SIDEWALKS & LANDSCAPING IN DOWNTOWN HAWKINSVILLE Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 449,950 $0 0 Phase CST Fund HPP Year 2016 Federal $359,960 State $0 Other $89,990 Total $449,950 Project: 331890- Type Work: Replace Bridge Descp:CR 198 @ TEN MILE CRK TRIB NW OF FINLEYSON Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $300,000 $10,824 $510,000 $10,200 Project: M004948 Type Work: Resurface & Maintenance Descp:SR 112 FROM WILCOX COUNTY LINE TO SR 11 Length: 8.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 983,799 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $787,039 State $196,760 Other $0 Total $983,799 297 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005071 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 11BU TO SR 230 Length: 0.68 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 191,052 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $152,842 State $38,210 Other $0 Total $191,052 Project: M005089 Type Work: Resurface & Maintenance Descp:SR 27 FROM SR 11 TO OCMULGEE RIVER Length: 0.22 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 52,153 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $41,722 State $10,431 Other $0 Total $52,153 Pulaski Totals Summary County Summary excludes lump sum projects. Project PI# 0005533 0005533 0005533 0007050 0007050 0007050 0007585 331890- Year 2018 2016 2018 2015 2016 2016 2016 2016 Phase PE ROW CST ROW CST UTL CST ROW Fund STP STP STP NHPP NHPP NHPP HPP Local Federal $8,000 $128,367 $1,771,930 $42,448 $6,664,240 $1,255,621 $359,960 $0 State $2,000 $32,092 $442,983 $10,612 $1,666,060 $313,905 $0 $0 Other $0 $0 $0 $0 $0 $0 $89,990 $10,824 Total $10,000 $160,459 $2,214,913 $53,060 $8,330,300 $1,569,527 $449,950 $10,824 $10,230,567 $2,467,652 $100,814 $12,799,033 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 298 STATE TRANSPORTATION IMPROVEMENT PROGRAM Putnam Project: 0007430 Type Work: RRX Warning Device Descp:CS 500/MAPLE STREET @ NS #733066A Length: 0.40 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 165,204 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $7,030 $158,174 State $0 $0 Other $0 $0 Total $7,030 $158,174 Project: 0009896 Type Work: RRX Warning Device Descp:SR 16 @ NS #733043T Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 265,302 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $265,302 State $0 Other $0 Total $265,302 Project: 0011702 Type Work: TE-Bike/Ped Facility Descp:SR 24 FROM SR 16 TO N OF EAST HARRIS ST/WILLIE BAILEY ST Length: 0.10 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 312,500 $0 18 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $250,000 State $0 Other $62,500 Total $312,500 Project: 0013260 Type Work: Pedestrian Crossings Descp:SR 22; SR 24; SR 29; SR 44 & SR 57 @ 5 LOCS PED UPGRADES Length: 2.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 795,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $153,000 $562,500 State $17,000 $62,500 Other $0 $0 Total $170,000 $625,000 Also in Baldwin, Wilkinson County 299 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 222580- Type Work: Widening Descp:SR 24/US 441 FM EATONTON BP @ S OF SHERWOOD AVE TO MORGAN CL Lanes: Exist. 2 Prop. 4 Length: 9.19 Total Project Cost: Total Project Authorizations: Total Parcels: $ 41,240,632 $0 80 Phase PE ROW CST UTL Fund NHPP NHPP NHPP NHPP Year Federal 2015 $40,000 After 2018 $7,271,406 After 2018 $23,780,351 After 2018 $1,900,749 State $10,000 $1,817,851 $5,945,088 $475,187 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development Project: M004968 Type Work: Resurface & Maintenance Descp:SR 16 FROM 0.60 MI E OF ROOTY CREEK TO HANCOCK COUNTY LINE Length: 13.40 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,875,773 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,300,619 State $575,155 Other $0 $0 $0 $0 Total $50,000 $9,089,257 $29,725,438 $2,375,936 Other $0 Total $2,875,773 Project: M004986 Type Work: Resurface & Maintenance Descp:SR 24 FROM CS 640/SARA LEE DR TO MORGAN COUNTY LINE Length: 8.90 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,637,191 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,309,752 State $327,438 Other $0 Total $1,637,191 Project: M004999 Type Work: Resurface & Maintenance Descp:SR 24BU/US 441BU FROM SR 16 TO SR 24/US 441 Phase CST Length: 1.38 Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 338,480 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $270,784 State $67,696 Other $0 Total $338,480 Project: M005065 Type Work: Resurface & Maintenance Descp:SR 24 FROM CR 497/TED DUNN BLVD TO CS 640/JEFFERSON AVE Length: 5.60 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,620,159 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,296,127 State $324,032 Other $0 Total $1,620,159 300 STATE TRANSPORTATION IMPROVEMENT PROGRAM Putnam Totals Summary County Summary excludes lump sum projects. Project PI# 222580- Year 2015 Phase PE Fund NHPP Federal $40,000 State $10,000 Other $0 Total $50,000 $40,000 $10,000 $0 $50,000 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 301 STATE TRANSPORTATION IMPROVEMENT PROGRAM Quitman Project: M005051 Type Work: Resurface & Maintenance Descp:SR 50 FROM ALABAMA STATE LINE TO SR 39 Length: 2.70 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 711,186 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $568,949 State $142,237 Other $0 Total $711,186 302 STATE TRANSPORTATION IMPROVEMENT PROGRAM Rabun Project: 122090- Type Work: Widening Descp:SR 15/US 441 FM NORTH CL/CLAYTON TO NORTH CAROLINA LINE Lanes: Exist. 2 Prop. 4 Length: 7.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 63,210,595 $ 200,000 188 Phase PE ROW ROW CST UTL Fund NHS NHPP HPP NHPP NHPP Year Federal 2014 $160,000 2016 $15,425,595 2016 $1,799,800 After 2018 $31,786,003 After 2018 $1,324,367 State $40,000 $3,856,399 $449,950 $7,946,501 $331,092 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development - Project on GRIP corridor & State Freight Network if on GRIP/FN Project: 170940- Type Work: Replace Bridge Descp:CR 86/CAT GAP ROAD @ TALLULAH RIVER 7.1 MI NW OF TIGER Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $81,600 $0 $408,000 $8,160 State $20,400 $0 $102,000 $2,040 Other $0 $0 $90,890 $0 $0 Total $200,000 $19,281,993 $2,340,640 $39,732,503 $1,655,459 Other $0 $10,824 $0 $0 Total $102,000 $10,824 $510,000 $10,200 Project: M003640 Type Work: Culvert Descp:SR 246 FROM CR 7/KELLEYS ROAD TO CR 92/WAYFARER LANE Length: 0.84 Phase Fund Year CST Emergency LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 16,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $12,800 State $3,200 Other $0 Project: M003641 Type Work: Shoulder Work Descp:SR 246 FROM CR 92/WAYFARER LANE TO CS 853/WINDING RIDGE ROAD Length: 1.42 Phase Fund Year CST Emergency LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $12,000 State $3,000 Other $0 Total $16,000 Total $15,000 303 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M003642 Type Work: Shoulder Work Descp:SR 246 FROM CS 853/WINDING RIDGE ROAD TO NORTH CAROLINA Length: 0.68 Phase Fund Year CST Emergency LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 14,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $11,200 State $2,800 Other $0 Total $14,000 Project: M004996 Type Work: Bridges Descp:SR 28; SR 52; SR 72 & SR 77 @ 4 LOCS - SCOUR REPAIR & REHAB Length: 1.20 Phase PE CST Fund STP STP Year 2014 LUMP Federal $360,000 $1,680,000 State $90,000 $420,000 Other $0 $0 Total $450,000 $2,100,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,550,000 $ 450,000 0 Project Details: Painting steel superstructure - deck rehab - correct broken welds - joint replacement - spall repairs on State Freight Network on GRIP network Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Also in Elbert, Hart, Lumpkin County Rabun Totals Summary County Summary excludes lump sum projects. Project PI# 122090122090170940- Year 2016 2016 2016 Phase ROW ROW ROW Fund HPP NHPP Local Federal $1,799,800 $15,425,595 $0 State $449,950 $3,856,399 $0 Other $90,890 $0 $10,824 Total $2,340,640 $19,281,993 $10,824 $17,225,395 $4,306,349 $101,714 $21,633,458 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 304 STATE TRANSPORTATION IMPROVEMENT PROGRAM Randolph Project: 0008362 Type Work: Replace Bridge Descp:CR 22/ELEVEN BRIDGES RD @ CARTER CREEK 10 MI SE OF CUTHBERT Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $300,000 $10,824 $510,000 $10,200 Project: 0009851 Type Work: Roundabout Descp:SR 1/US 27 @ SR 50/US 82 Length: 0.25 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 850,000 $0 0 Project Details: On Freight/GRIP Network Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $850,000 State $0 Other $0 Total $850,000 Project: 0010606 Type Work: TE-Bike/Ped Facility Descp:SHELLMAN DOWNTOWN STREETSCAPES @ 4 LOCS Length: 0.79 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $300,000 State $0 Other $75,000 Total $375,000 Project: M005052 Type Work: Resurface & Maintenance Descp:SR 1 FROM SR 1BU TO SR 1BU Length: 4.14 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,163,190 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $930,552 State $232,638 Other $0 Total $1,163,190 305 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005077 Type Work: Resurface & Maintenance Descp:SR 1 FM S OF MILL POND RD/CLAY TO CARNEGIE BILULAH/RANDOLPH Length: 7.67 Phase CST Fund NHPP Year LUMP Total Project Cost: $0 Total Project Authorizations: $0 Total Parcels: 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $0 State $0 Other $0 Total $0 Also in Clay County Randolph Totals Summary County Summary excludes lump sum projects. Project PI# 0008362 Year 2016 Phase ROW Fund Local Federal $0 State $0 Other $10,824 Total $10,824 $0 $0 $10,824 $10,824 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 306 STATE TRANSPORTATION IMPROVEMENT PROGRAM Schley Project: M005074 Type Work: Resurface & Maintenance Descp:SR 26 FROM CHATTAHOOCHEE COUNTY LINE TO SR 3 Length: 23.27 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,801,340 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $3,841,072 State $960,268 Other $0 Total $4,801,340 Also in Marion County Project: M005090 Type Work: Resurface & Maintenance Descp:SR 26 FROM ELLAVILLE TO MACON COUNTY LINE Length: 5.52 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 605,810 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $484,648 State $121,162 Other $0 Total $605,810 Project: M005177 Type Work: Resurface & Maintenance Descp:SR 153 FROM SR 30/SUMTER TO SR 26/SCHLEY Length: 9.08 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,264,475 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,811,580 State $452,895 Other $0 Total $2,264,475 Also in Sumter County 307 STATE TRANSPORTATION IMPROVEMENT PROGRAM Screven Project: 0009918 Type Work: Roundabout Descp:SR 73 LOOP @ CR 248/BUTTERMILK ROAD/SINGLETON ROAD Length: 0.12 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,238,469 $ 300,000 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $300,000 $938,469 State $0 $0 Other $0 $0 Project: M004709 Type Work: Resurface & Maintenance Descp:SR 21 FROM S OF CS 761/HALCYONDALE RD TO S OF SR 73 Length: 1.71 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 798,080 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $638,464 State $159,616 Other $0 Total $300,000 $938,469 Total $798,080 308 STATE TRANSPORTATION IMPROVEMENT PROGRAM Seminole Project: M005059 Type Work: Resurface & Maintenance Descp:SR 91 ALT FROM SR 91 TO SR 91 Length: 1.85 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 503,536 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $402,829 State $100,707 Other $0 Total $503,536 309 STATE TRANSPORTATION IMPROVEMENT PROGRAM Spalding Project: 0000410 Type Work: Intersection Improvement Descp:SR 362 @ CR 507/ROVER ZETELLA ROAD/MORELAND ROAD Length: 0.48 Phase ROW CST UTL Fund HSIP HSIP HSIP Year 2014 LUMP LUMP Federal $828,000 $2,421,004 $57,480 State $92,000 $269,000 $6,387 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,673,871 $ 920,000 14 Project Details: realign- add traffic signal & turn lanes- improve traffic operatons- reduce congestion- reduce frequency and severity of crashes Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Other $0 $0 $0 Total $920,000 $2,690,004 $63,867 Project: 331690- Type Work: Replace Bridge Descp:CR 496 @ UNNAMED CREEK S OF SR 16 Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $81,600 $0 $408,000 $8,160 State $20,400 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $102,000 $10,824 $510,000 $10,200 Project: M005002 Type Work: Resurface & Maintenance Descp:SR 92 FROM SR 3 TO CR 347/WESTMORELAND ROAD Length: 2.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 376,662 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $301,330 State $75,332 Other $0 Total $376,662 Project: M005003 Type Work: Resurface & Maintenance Descp:SR 92 FROM CR 347/WESTMORELAND ROAD TO SR 85 Length: 14.67 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,385,234 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $3,508,187 State $877,047 Other $0 Total $4,385,234 Also in Fayette County 310 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005045 Type Work: Resurface & Maintenance Descp:SR 7 FROM CS 600/REDBUD DRIVE TO CR 322/MEADOVISTA ROAD Length: 14.46 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,564,550 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $5,251,640 State $1,312,910 Other $0 Total $6,564,550 Also in Lamar, Pike County Project: T004090 Type Work: Transit Projects Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR SPALDING Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 227,585 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2015 Federal $182,068 State $0 Other $45,517 Total $227,585 Project PI# 331690T004090 Year 2016 2015 Spalding Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Phase Fund Federal State Other ROW CST Local Transit $0 $182,068 $0 $10,824 $0 $45,517 Total $10,824 $227,585 $182,068 $0 $56,341 $238,409 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 311 STATE TRANSPORTATION IMPROVEMENT PROGRAM Stephens Project: 0010416 Type Work: Replace Bridge Descp:SR 184 @ TOCCOA CREEK 3.5 MI NE OF TOCCOA Length: 0.15 Phase ROW CST UTL Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,710,500 $0 7 Fund STP STP STP Year 2015 2016 2016 Federal $152,592 $1,137,154 $78,654 State $38,148 $284,289 $19,664 Other $0 $0 $0 Total $190,740 $1,421,443 $98,318 Project: 0010689 Type Work: TE-Bike/Ped Facility Descp:CS 510/FOREACRE STREET & CR 780/SOUTH PARK LANE @ 2 LOCS Length: 0.22 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 406,250 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $325,000 State $0 Other $81,250 Total $406,250 Project: 0013154 Type Work: RRX Warning Device Descp:RAILROAD CROSSING UPGRADES @SEV LOC FM TOCCOA TO OAKWOOD Length: 0.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 505,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Project: M003644 Type Work: Shoulder Work Descp:SR 17 ALT FM CR 171/BLACK MOUNTAIN RD TO CR 174/PHILLIPS RD Length: 2.00 Phase Fund Year CST Emergency LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 25,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $5,000 $500,000 Federal $20,000 State $0 $0 Other $0 $0 Total $5,000 $500,000 Also in Banks, Habersham, Hall County State $5,000 Other $0 Total $25,000 Project: M003645 Type Work: Drainage Improvements Descp:SR 17 FROM I-985 TO HABERSHAM COUNTY LINE Phase Fund CST Emergency Year LUMP Length: 3.98 Total Project Cost: Total Project Authorizations: Total Parcels: $ 65,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $52,000 State $13,000 Other $0 Total $65,000 312 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005200 Type Work: Resurface & Maintenance Descp:SR 106 FROM SR 59/FRANKLIN TO SR 63/STEPHENS Length: 9.90 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,469,105 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,975,284 State $493,821 Other $0 Total $2,469,105 Also in Franklin County Stephens Totals Summary County Summary excludes lump sum projects. Project PI# 0010416 0010416 0010416 Year 2015 2016 2016 Phase ROW CST UTL Fund STP STP STP Federal $152,592 $1,137,154 $78,654 State $38,148 $284,289 $19,664 Other $0 $0 $0 Total $190,740 $1,421,443 $98,318 $1,368,400 $342,100 $0 $1,710,500 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 313 STATE TRANSPORTATION IMPROVEMENT PROGRAM Stewart Project: 0007887 Type Work: Replace Bridge Descp:CR 33/2ND AVE @ HANNAHATCHEE CREEK Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,595,198 $ 155,000 4 Phase PE ROW CST UTL Fund Bridge Local STP STP Year 2014 2016 2017 2017 Federal $124,000 $0 $1,033,165 $34,097 State $31,000 $0 $258,291 $8,524 Other $0 $106,121 $0 $0 Total $155,000 $106,121 $1,291,457 $42,621 Project: 0011687 Type Work: Replace Bridge Descp:SR 39 @ HANNAHATCHEE CREEK TRIBUTARY 4.5 MI E OF OMAHA Length: 0.40 Phase ROW CST UTL Total Project Cost: Total Project Authorizations: Total Parcels: $ 766,426 $0 1 Fund STP STP STP Year 2016 2018 2018 Federal $127,345 $441,632 $44,163 State $31,836 $110,408 $11,041 Other $0 $0 $0 Total $159,181 $552,040 $55,204 Project: M004575 Type Work: Bridges Descp:SR 39 @ HANNAHATCHEE CREEK TRIB CULVERT REHAB Length: 0.40 Phase PE CST Fund STP STP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 0 Project Details: Bridge culvert rehab Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2015 - FY 2018 Federal $40,000 $160,000 State $10,000 $40,000 Other $0 $0 Total $50,000 $200,000 Project: M004997 Type Work: Resurface & Maintenance Descp:SR 39 CONN FROM SR 39 TO SR 1/US 27 Length: 15.70 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,654,152 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,323,322 State $330,830 Other $0 Total $1,654,152 314 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005091 Type Work: Resurface & Maintenance Descp:SR 27 FROM SR 1 CONN TO SR 520 Length: 8.80 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,545,265 $0 0 Project Details: On Freight/GRIP Network Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,236,212 State $309,053 Other $0 Total $1,545,265 Project: M005134 Type Work: Resurface & Maintenance Descp:SR 520 FROM CHATTAHOOCHEE COUNTY LINE TO SR 27/US 280 Length: 11.30 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,190,568 $0 0 Project Details: On Freight/GRIP Network Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $952,454 State $238,114 Other $0 Total $1,190,568 Stewart Totals Summary County Summary excludes lump sum projects. Project PI# 0007887 0007887 0007887 0011687 0011687 0011687 Year 2016 2017 2017 2016 2018 2018 Phase ROW CST UTL ROW CST UTL Fund Local STP STP STP STP STP Federal $0 $1,033,165 $34,097 $127,345 $441,632 $44,163 State $0 $258,291 $8,524 $31,836 $110,408 $11,041 Other $106,121 $0 $0 $0 $0 $0 Total $106,121 $1,291,457 $42,621 $159,181 $552,040 $55,204 $1,680,402 $420,101 $106,121 $2,206,624 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 315 STATE TRANSPORTATION IMPROVEMENT PROGRAM Sumter Project: 0010213 Type Work: TE-Landscape/Beautify Descp:GEORGIA SOUTHWESTERN STATE UNIVERSITY ENTRACEWAY Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,600,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $1,280,000 State $0 Other $320,000 Total $1,600,000 Project: 0010607 Type Work: TE-Rehab Hist Trans Bldg Descp:ANDERSONVILLE HISTORICAL TRAIN DEPOT Length: 0.04 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 250,000 $0 1 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $200,000 State $0 Other $50,000 Total $250,000 Project: M004962 Type Work: Resurface & Maintenance Descp:SR 27 FROM SR 30 TO DOOLEY COUNTY LINE Length: 14.21 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,245,748 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,796,598 State $449,150 Other $0 Total $2,245,748 Project: M004970 Type Work: Resurface & Maintenance Descp:SR 27 FROM SR 3 TO 0.06 MI W OF SR 49 Length: 1.03 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 131,131 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $104,905 State $26,226 Other $0 Total $131,131 316 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005046 Type Work: Resurface & Maintenance Descp:SR 49 FROM SR 27 TO MACON COUNTY LINE Length: 9.64 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,994,796 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,595,837 State $398,959 Other $0 Total $1,994,796 Project: M005047 Type Work: Resurface & Maintenance Descp:SR 27 FROM SR 49 TO SR 3 Length: 1.03 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 378,945 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $303,156 State $75,789 Other $0 Total $378,945 Project: M005146 Type Work: Resurface & Maintenance Descp:SR 30 FROM SR 27 TO 0.25 MI E OF CR 307/FELDER STREET Length: 1.30 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 142,673 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $114,138 State $28,535 Other $0 Total $142,673 Project: M005158 Type Work: Resurface & Maintenance Descp:SR 27/US 280 FROM PLAINS CITY LIMITS TO 0.06 MI W OF SR 49 Length: 8.57 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,890,250 $0 0 Project Details: On GRIP Network Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,312,200 State $578,050 Other $0 Total $2,890,250 317 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005159 Type Work: Resurface & Maintenance Descp:SR 49 FROM TERRELL COUNTY LINE TO SR 27 Length: 13.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,390,752 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,112,602 State $278,150 Other $0 Total $1,390,752 Project: M005177 Type Work: Resurface & Maintenance Descp:SR 153 FROM SR 30/SUMTER TO SR 26/SCHLEY Length: 9.08 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,264,475 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,811,580 State $452,895 Other $0 Total $2,264,475 Also in Schley County 318 STATE TRANSPORTATION IMPROVEMENT PROGRAM Talbot Project: 0007051 Type Work: Replace Bridge Descp:SR 22 @ POTTERS CREEK 10.1 MI E OF TALBOTTON Length: 0.21 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,172,476 $ 1,172,476 3 Phase CST CST UTL Fund Bridge Bond Local Year 2015 2015 LOCL Federal $22,296 $0 $0 State $5,574 $1,138,606 $0 Other $0 $0 $6,000 Total $27,870 $1,138,606 $6,000 Project: M005004 Type Work: Resurface & Maintenance Descp:SR 22 FROM MUSCOGEE COUNTY LINE TO SR 96 Phase CST Length: 7.80 Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,746,342 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,397,074 State $349,268 Other $0 Total $1,746,342 Project: M005160 Type Work: Resurface & Maintenance Descp:SR 22 FROM S OF CR 110/CARTER ROAD TO CS 533/ADAMS STREET Length: 1.88 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 412,663 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $330,130 State $82,533 Other $0 Total $412,663 Project: M005189 Type Work: Resurface & Maintenance Descp:SR 41 FM N OF CS 532/INDUSTRIAL BLVD/MARION TO SR 22/TALBOT Length: 17.61 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,087,313 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,669,850 State $417,463 Other $0 Total $2,087,313 Also in Marion County Project: M005191 Type Work: Resurface & Maintenance Descp:SR 208 FROM HARRIS COUNTY LINE TO SR 41 Length: 11.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,738,440 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,390,752 State $347,688 Other $0 Total $1,738,440 319 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005218 Type Work: Resurface & Maintenance Descp:SR 36 FROM SR 208/HARRIS TO SR 41/TALBOT Length: 10.15 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,857,935 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,486,348 State $371,587 Other $0 Total $1,857,935 Also in Harris County Talbot Totals Summary County Summary excludes lump sum projects. Project PI# 0007051 0007051 Year 2015 2015 Phase CST CST Fund Bond Bridge Federal $0 $22,296 State $1,138,606 $5,574 Other $0 $0 Total $1,138,606 $27,870 $22,296 $1,144,180 $0 $1,166,476 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 320 STATE TRANSPORTATION IMPROVEMENT PROGRAM Taliaferro Project: 0013259 Type Work: Pedestrian Crossings Descp:SR 12; SR 15; SR 24 BYP; SR 36 &SR 162 @5 LOC - PED UPGRADES Length: 2.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 795,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Project: M004920 Type Work: Resurface & Maintenance Descp:I-20 FROM SR 44/GREENE TO SR10/SR 17/MCDUFFIE Length: 41.95 Phase CST Fund NHPP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,191,045 $ 8,191,045 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $153,000 $562,500 Federal $7,371,941 State $17,000 $62,500 Other $0 $0 Total $170,000 $625,000 Also in Greene, Morgan, Newton County State $819,105 Other $0 Total $8,191,045 Also in Greene, McDuffie, Warren County 321 STATE TRANSPORTATION IMPROVEMENT PROGRAM Tattnall Project: 0009880 Type Work: Roundabout Descp:SR 23/US 25/US 301 @ SR 196 Length: 0.50 Phase CST Fund HSIP Year LUMP Federal $938,469 Total Project Cost: Total Project Authorizations: Total Parcels: $ 938,469 $0 0 Project Details: Project will improve the capacity and operations of the intersection to enhance mobility. Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 State $0 Other $0 Total $938,469 Project: M005009 Type Work: Resurface & Maintenance Descp:SR 23 FROM LONG COUNTY LINE TO 0.14 MI N OF LOVES CHAPEL RD Length: 7.05 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,538,685 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,030,948 State $507,737 Other $0 Total $2,538,685 Project: M005097 Type Work: Resurface & Maintenance Descp:SR 144 FROM SR 121 TO SR 23 Length: 6.10 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,267,275 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,013,820 State $253,455 Other $0 Total $1,267,275 322 STATE TRANSPORTATION IMPROVEMENT PROGRAM Taylor Project: 0007606 Type Work: Landscaping Descp:SR 96 FROM E OF CS 611/SUMTER ST TO E OF CS 563/S MIMS ST Length: 1.36 Total Project Cost: Total Project Authorizations: Total Parcels: $ 341,000 $0 0 Phase CST Fund HPP Year 2016 Federal $272,800 State $0 Other $68,200 Total $341,000 Project: 0010608 Type Work: TE-Bike/Ped Facility Descp:SR 3; SR 137 & SR 137WE @ 4 LOCS IN BUTLER Length: 0.97 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 312,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $250,000 State $0 Other $62,500 Project: 370892- Type Work: Replace Bridge Descp:CR 247 @ HORSE CREEK SE OF BUTLER Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $312,500 Total $300,000 $10,824 $510,000 $10,200 Project: M005005 Type Work: Resurface & Maintenance Descp:SR 137 FROM MARION COUNTY LINE TO SR 128 Length: 27.23 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 9,809,507 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $7,847,606 State $1,961,901 Other $0 Total $9,809,507 Project: M005092 Type Work: Resurface & Maintenance Descp:SR 90 FROM SR 3 TO SR 137 Length: 4.76 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 18,653 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $14,922 State $3,731 Other $0 Total $18,653 323 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005161 Type Work: Resurface & Maintenance Descp:SR 3 SO/US 19 FROM SR 3 TO SR 3 IN BUTLER Length: 1.01 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 115,283 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $92,226 State $23,057 Other $0 Total $115,283 Project: M005162 Type Work: Resurface & Maintenance Descp:SR 90 FROM MACON COUNTY LINE TO SR 3 Length: 5.10 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 559,716 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $447,773 State $111,943 Other $0 Total $559,716 Taylor Totals Summary County Summary excludes lump sum projects. Project PI# 0007606 370892- Year 2016 2016 Phase CST ROW Fund HPP Local Federal $272,800 $0 State $0 $0 Other $68,200 $10,824 Total $341,000 $10,824 $272,800 $0 $79,024 $351,824 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 324 STATE TRANSPORTATION IMPROVEMENT PROGRAM Telfair Project: 0002425 Type Work: Replace Bridge Descp:SR 31/US 319/US 441 @ TURNPIKE CREEK 5.3 MI S OF MCRAE Length: 0.20 Phase ROW CST UTL Fund NHPP NHPP NHPP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,896,716 $0 4 Year 2015 2016 2016 Federal $81,600 $2,149,815 $85,958 State $20,400 $537,454 $21,489 Other $0 $0 $0 Total $102,000 $2,687,268 $107,447 Project: 0012847 Type Work: Sidewalks Descp:SIDEWALK & CROSSWALK IN MCRAE Lanes: Exist. Prop. Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 260,900 $0 0 Phase CST Fund HPP Year 2015 Federal $208,720 State $0 Other $52,180 Total $260,900 Project: 0013079 Type Work: RRX Consolidation Descp:CS 692 @ CSX #635214X/DODGE & CS 729 @ CSX #635213R/TELFAIR Length: 0.42 Phase CST Fund HSIP Year LUMP Federal $240,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 240,000 $0 0 Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018 State $0 Other $0 Total $240,000 Also in Dodge County Project: M004555 Type Work: Resurface & Maintenance Descp:SR 31/US 319 FROM COFFEE COUNTY LINE TO 0.01 MI S OF SR 132 Length: 18.32 Phase CST Fund NHPP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,415,938 $ 3,415,938 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,732,751 State $683,188 Other $0 Total $3,415,938 Project: M004556 Type Work: Resurface & Maintenance Descp:SR 149 FROM 0.01 MI N OF SR 117 TO WHEELER COUNTY LINE Length: 18.51 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,765,530 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,212,424 State $553,106 Other $0 Total $2,765,530 325 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004557 Type Work: Resurface & Maintenance Descp:SR 165 FROM 0.01 MI S OF CR 3/CRAVEY FARM ROAD TO SR 30 Length: 1.86 Phase CST Fund STP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 312,525 $ 312,525 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $250,020 State $62,505 Other $0 Total $312,525 Project: M004558 Type Work: Resurface & Maintenance Descp:SR 30/US 280 FROM DODGE COUNTY LINE TO SR 31 Length: 9.61 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,369,530 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,895,624 State $473,906 Other $0 Total $2,369,530 Project: M004975 Type Work: Resurface & Maintenance Descp:SR 27 FROM S OF HELENA CITY LIMITS TO W OF CS 743/6TH AVE Length: 1.59 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 583,574 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $466,859 State $116,715 Other $0 Total $583,574 Telfair Totals Summary County Summary excludes lump sum projects. Project PI# 0002425 0002425 0002425 0012847 Year 2015 2016 2016 2015 Phase ROW CST UTL CST Fund NHPP NHPP NHPP HPP Federal $81,600 $2,149,815 $85,958 $208,720 State $20,400 $537,454 $21,489 $0 Other $0 $0 $0 $52,180 Total $102,000 $2,687,268 $107,447 $260,900 $2,526,092 $579,343 $52,180 $3,157,615 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 326 STATE TRANSPORTATION IMPROVEMENT PROGRAM Terrell Project: 0007597 Type Work: Streetscapes Descp:STREETSCAPE IN DAWSON Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 247,923 $0 0 Phase PE CST Fund HPP HPP Year 2015 After 2018 Federal $38,339 $105,645 State $0 $0 Other $9,585 $94,355 Total $47,923 $200,000 Project: M004800 Type Work: Resurface & Maintenance Descp:SR 55 FROM CALHOUN COUNTY LINE TO SR 520/US 82 Length: 10.80 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,100,000 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $880,000 State $220,000 Other $0 Total $1,100,000 Project: M004971 Type Work: Resurface & Maintenance Descp:SR 520/US 82 FROM WEBSTER COUNTY LINE TO SR 45 Length: 10.60 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,350,448 $0 0 Project Details: On Freight/GRIP Network Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,680,358 State $670,090 Other $0 Total $3,350,448 Project: M004972 Type Work: Resurface & Maintenance Descp:SR 520 FM 0.30 MI E OF CR 138/TAMMY LANE TO LEE COUNTY LINE Length: 8.50 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,795,200 $0 0 Project Details: On Freight/GRIP Network Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $2,236,160 State $559,040 Other $0 Total $2,795,200 327 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005075 Type Work: Resurface & Maintenance Descp:SR 32 FROM SR 520 TO CR 136/OLD MILL ROAD Length: 1.50 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 355,590 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $284,472 State $71,118 Other $0 Total $355,590 Terrell Totals Summary County Summary excludes lump sum projects. Project PI# 0007597 Year 2015 Phase PE Fund HPP Federal $38,339 State $0 Other $9,585 Total $47,923 $38,339 $0 $9,585 $47,923 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 328 STATE TRANSPORTATION IMPROVEMENT PROGRAM Thomas Project: 0001570 Type Work: Turn Lanes Descp:SR 3/US 19 FROM CR 219/SUNSET DRIVE TO CR 159/BIG CREEK ROAD Length: 21.31 Phase CST Fund NHPP Year 2018 Federal $11,004,185 State $2,751,046 Other $0 Total $13,755,232 Total Project Cost: Total Project Authorizations: Total Parcels: $ 13,755,232 $0 0 Project Details: Project will improve the capacity and operations of the intersection to enhance mobility. On GRIP Network Also in Mitchell County Project: 0007126 Type Work: Median Crossovers Descp:SR 3/US 19 FM N OF FLORIDA STATE LN TO S OF CR 219 - 20 LOCS Length: 9.49 Phase CST UTL Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 9,026,438 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $8,117,886 $5,909 State $901,987 $657 Other $0 $0 Total $9,019,873 $6,565 Project: 0007607 Type Work: Streetscapes Descp:STREETSCAPE IN THOMASVILLE Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,000 $0 0 Phase CST Fund HPP Year 2016 Federal $215,977 State $0 Other $84,023 Total $300,000 Project: 0010609 Type Work: TE-Bike/Ped Facility Descp:CR 384/METCALF ROAD FM BROAD STREET TO METCALF-BEACHTON ROAD Length: 0.12 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 187,500 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $150,000 State $0 Other $37,500 Total $187,500 329 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0013078 Type Work: RRX Warning Device Descp:CS 756/COVINGTON AVE @ CSX #636917D Length: 0.40 Phase PE CST Fund STP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 288,885 $ 13,885 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $13,885 $275,000 State $0 $0 Other $0 $0 Total $13,885 $275,000 Project: M004899 Type Work: Resurface & Maintenance Descp:SR 38 FROM CR 34/GATLIN CREEK ROAD TO BROOKS COUNTY LINE Length: 10.16 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,821,145 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,456,916 State $364,229 Other $0 Total $1,821,145 Project: M005069 Type Work: Resurface & Maintenance Descp:SR 35 FROM SR 3/SR 300 TO COLQUITT COUNTY LINE Length: 13.01 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 5,185,316 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $4,148,253 State $1,037,063 Other $0 Total $5,185,316 Thomas Totals Summary County Summary excludes lump sum projects. Project PI# 0001570 0007607 Year 2018 2016 Phase CST CST Fund NHPP HPP Federal $10,674,060 $215,977 State $2,668,515 $0 Other $0 $84,023 Total $13,342,575 $300,000 $10,890,037 $2,668,515 $84,023 $13,642,575 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 330 STATE TRANSPORTATION IMPROVEMENT PROGRAM Tift Project: 0001340 Type Work: New Construction Descp:SOUTH TIFTON BYP FM SR 520/US 82 WEST TO SR 35/US 319 EAST Lanes: Exist. 0 Prop. 2 Length: 7.50 Phase ROW CST UTL Fund HPP STP STP Year Federal 2016 $4,049,550 After 2018 $48,980,846 After 2018 $943,751 State $1,012,387 $12,245,211 $235,938 Total Project Cost: Total Project Authorizations: Total Parcels: $ 67,467,683 $0 107 Project Details: new bypass 0-2 lanes- improve mobility and connectivity-enhance economic development- increase safety- remove truck traffic from commercial areas downtown Project: 0007273 Type Work: Realignment Descp:CR 299/OLD OMEGA ROAD FROM SR 35/US 319 TO I-75 Length: 0.30 Phase ROW CST UTL Fund STP STP STP Year 2014 2015 2015 Federal $288,000 $1,190,338 $5,998 State $72,000 $297,585 $1,499 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,855,420 $ 360,000 7 Project Details: intersection improve & re-alignment- additions of left and right turn lanes- improve capacity and operations- improve mobility and connectivity Project: 0007578 Type Work: Sidewalks Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN TIFTON Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 704,271 $0 0 Phase ROW CST Fund Local HPP Year LOCL 2016 Federal $0 $554,925 State $0 $0 Other $0 $0 $0 Total $5,061,937 $61,226,057 $1,179,688 Other $0 $0 $0 Total $360,000 $1,487,923 $7,497 Other $5,000 $144,346 Total $5,000 $699,271 Project: 0010674 Type Work: TE-Bike/Ped Facility Descp:SR 7 FROM 4TH ST TO 1ST ST & FROM SR 520 TO POPLAR ST Length: 0.49 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 625,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $500,000 State $0 Other $125,000 Total $625,000 331 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004807 Type Work: Resurface & Maintenance Descp:I-75 FM S OF CR 204/SOUTHWELL RD/TIFT TO S OF SR 32/TURNER Length: 19.00 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 50,000 $0 0 Project Details: On Freight/GRIP Network Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $45,000 State $5,000 Other $0 Total $50,000 Also in Turner County Project: M005210 Type Work: Resurface & Maintenance Descp:SR 35 FROM SR 520 TO IRWIN COUNTY LINE Length: 7.93 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,823,444 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,458,755 State $364,689 Other $0 Total $1,823,444 Tift Totals Summary County Summary excludes lump sum projects. Project PI# 0001340 0007273 0007273 0007578 Year 2016 2015 2015 2016 Phase ROW CST UTL CST Fund HPP STP STP HPP Federal $4,049,550 $1,190,338 $5,998 $554,925 State $1,012,387 $297,585 $1,499 $0 Other $0 $0 $0 $144,346 Total $5,061,937 $1,487,923 $7,497 $699,271 $5,800,811 $1,311,471 $144,346 $7,256,628 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 332 STATE TRANSPORTATION IMPROVEMENT PROGRAM Toombs Project: 0001216 Type Work: Replace Bridge Descp:SR 4/US 1 @ ALTAMAHA RIVER; OVERFLOW & WILLIAMS CREEK - TIA Length: 1.56 Phase CST CST Fund State Bond Year 2014 2015 Federal $0 $0 State $0 $20,256,273 Other $4,969,781 $0 Total $4,969,781 $20,256,273 Total Project Cost: Total Project Authorizations: Total Parcels: $ 25,226,054 $ 4,969,781 7 Project Details: Widen bridges from 2 to 4 lanes-improve operation and mobility-reduce crash frequency-enhance economic development-on a GRIP corridor-on State Freight corridor Also in Appling County Project: 0009135 Type Work: TE-Bike/Ped Facility Descp:SR 4/US 1 FROM VICTORY DRIVE TO RAILROAD CORRIDOR @ US 280 Length: 0.99 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 15 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $300,000 State $0 Other $75,000 Total $375,000 Project: 0009883 Type Work: Roundabout Descp:SR 56 @ CR 332/CR 333/JOHNSON CORNER Length: 0.50 Phase PE CST Fund HSIP HSIP Year LUMP LUMP Federal $165,612 $938,469 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,104,081 $0 0 Project Details: Project will improve the capacity and operations of the intersection to enhance mobility. Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 State $0 $0 Other $0 $0 Total $165,612 $938,469 Project: 522180- Type Work: Widening Descp:SR 4/US 1 FM SR 56 TO SR 29; INC CLVT @ OPEN CREEK -TIA Lanes: Exist. 2 Prop. 4 Length: 4.34 Total Project Cost: Total Project Authorizations: Total Parcels: $ 23,406,968 $ 400,000 30 Phase PE ROW CST UTL Fund NHPP NHPP State State Year 2014 2017 After 2018 After 2018 Federal $320,000 $4,355,198 $0 $0 State $80,000 $1,088,799 $0 $0 Other $0 $0 $16,604,085 $958,886 Project Details: Widen from 2 to 4 lanes-improve operation and mobility-enhance economic development-on GRIP corridor-on State Freight corridor Total $400,000 $5,443,997 $16,604,085 $958,886 333 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 522200- Type Work: Widening Descp:SR 4 FM CR 386/GREEN OAK RD TO SR 130/FISHER BAREFOOT HWY Lanes: Exist. 2 Prop. 4 Length: 7.30 Phase ROW CST UTL Fund NHPP NHPP NHPP Year Federal 2016 $7,482,557 After 2018 $39,039,438 After 2018 $2,122,466 State $1,870,639 $9,759,859 $530,616 Total Project Cost: Total Project Authorizations: Total Parcels: $ 60,805,575 $0 110 Project Details: Widen from 2 to 4 lanes-improve operation and mobility-enhance economic development-on GRIP corridor Other $0 $0 $0 Total $9,353,196 $48,799,297 $2,653,082 Project: M005030 Type Work: Resurface & Maintenance Descp:SR 130 FROM SR 135/MONTGOMERY TO SR 30/TOOMBS Length: 6.07 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 574,142 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $459,313 State $114,828 Other $0 Total $574,142 Also in Montgomery County Project: M005124 Type Work: Resurface & Maintenance Descp:SR 30 FROM CS 770/CS 673/BROADFOOT BLVD TO SR 4/US 1 Length: 5.07 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,895,927 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,516,742 State $379,185 Other $0 Total $1,895,927 Project: M005173 Type Work: Resurface & Maintenance Descp:SR 130 FROM SR 30 TO SR 4 Length: 6.18 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,883,063 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,506,451 State $376,613 Other $0 Total $1,883,063 334 STATE TRANSPORTATION IMPROVEMENT PROGRAM Toombs Totals Summary County Summary excludes lump sum projects. Project PI# 0001216 522180522200- Year 2015 2017 2016 Phase CST ROW ROW Fund Bond NHPP NHPP Federal $0 $4,355,198 $7,482,557 State $17,622,958 $1,088,799 $1,870,639 Other $0 $0 $0 Total $17,622,958 $5,443,997 $9,353,196 $11,837,754 $20,582,396 $0 $32,420,151 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 335 STATE TRANSPORTATION IMPROVEMENT PROGRAM Towns Project: 0000303 Type Work: Replace Bridge Descp:SR 2 @ HIGHTOWER CREEK 6.1 MI E OF HIAWASSEE Length: 0.57 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,527,406 $0 4 Phase CST UTL Fund NHPP NHPP Year 2015 2015 Federal $1,976,514 $45,410 State $494,129 $11,353 Other $0 $0 Total $2,470,643 $56,763 Project: 0000304 Type Work: Replace Bridge Descp:SR 66 @ BRASSTOWN CREEK .5 MI NW OF YOUNG HARRIS Length: 0.76 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,437,961 $0 4 Phase ROW CST UTL Fund STP STP STP Year 2015 2016 2016 Federal $692,757 $2,042,025 $15,587 State $173,189 $510,506 $3,897 Other $0 $0 $0 Total $865,946 $2,552,531 $19,484 Project: 0000305 Type Work: Replace Bridge Descp:SR 66 @ CROOKED CREEK 3.2 MI NW OF YOUNG HARRIS Length: 0.66 Phase ROW CST UTL Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,129,776 $0 4 Fund STP STP STP Year 2015 2016 2016 Federal $681,360 $1,802,652 $19,809 State $170,340 $450,663 $4,952 Other $0 $0 $0 Total $851,700 $2,253,315 $24,762 Project: 0007495 Type Work: Pedestrian Crossings Descp:PEDESTRIAN UPGRADES @ 19 SR LOCATIONS IN DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,369,911 $ 580,000 18 Phase PE ROW CST UTL Fund HSIP HSIP HSIP HSIP Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year 2014 2014 LUMP LUMP Project: 0010688 Type Work: TE-Bike/Ped Facility Descp:SR 2/SR 515 FM CS 352/SCHOOL ST TO CR 33/BRASSTOWN CREEK Length: 0.33 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 343,750 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $18,000 $504,000 $2,429,920 $81,000 Federal $275,000 State $2,000 $56,000 $269,991 $9,000 Other $0 $0 $0 $0 Total $20,000 $560,000 $2,699,911 $90,000 Also in Lumpkin, Union, White County State $0 Other $68,750 Total $343,750 336 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005063 Type Work: Resurface & Maintenance Descp:SR 515 FROM UNION COUNTY LINE TO NORTH CAROLINA STATE LINE Length: 6.22 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,206,041 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $964,833 State $241,208 Other $0 Total $1,206,041 Towns Totals Summary County Summary excludes lump sum projects. Project PI# 0000303 0000303 0000304 0000304 0000304 0000305 0000305 0000305 Year 2015 2015 2015 2016 2016 2015 2016 2016 Phase CST UTL ROW CST UTL ROW CST UTL Fund NHPP NHPP STP STP STP STP STP STP Federal $1,976,514 $45,410 $692,757 $2,042,025 $15,587 $681,360 $1,802,652 $19,809 State $494,129 $11,353 $173,189 $510,506 $3,897 $170,340 $450,663 $4,952 Other $0 $0 $0 $0 $0 $0 $0 $0 Total $2,470,643 $56,763 $865,946 $2,552,531 $19,484 $851,700 $2,253,315 $24,762 $7,276,114 $1,819,029 $0 $9,095,142 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 337 STATE TRANSPORTATION IMPROVEMENT PROGRAM Treutlen Project: 0013257 Type Work: Pedestrian Crossings Descp:SR 4BU; SR 23; SR 26 & SR 46 @ 5 LOCS PEDESTRIAN UPGRADES Length: 2.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 795,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $153,000 $562,500 State $17,000 $62,500 Other $0 $0 Total $170,000 $625,000 Also in Emanuel County Project: M004189 Type Work: Signing Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,700,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Project: M004702 Type Work: Resurface & Maintenance Descp:SR 56 FROM MONTGOMERY COUNTY LINE TO SR 15 Length: 4.05 Phase CST Fund STP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,011,660 $ 1,011,660 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,700,000 Federal $809,328 State $0 Other $0 Total $1,700,000 Also in Bleckley, Emanuel, Laurens County State $202,332 Other $0 Total $1,011,660 Project: M004703 Type Work: Resurface & Maintenance Descp:SR 227 FROM SR 46 TO SR 56 Length: 2.18 Phase CST Fund STP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 328,783 $ 328,783 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $263,027 State $65,757 Other $0 Total $328,783 338 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005131 Type Work: Resurface & Maintenance Descp:SR 171 FROM SR 56/TREUTLEN TO SR 26/EMANUEL Length: 6.81 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,148,312 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $918,650 State $229,662 Other $0 Total $1,148,312 Also in Emanuel County Project: M005153 Type Work: Resurface & Maintenance Descp:SR 15 FROM I-16 TO EMANUEL COUNTY LINE Length: 5.07 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 623,196 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $498,557 State $124,639 Other $0 Total $623,196 339 STATE TRANSPORTATION IMPROVEMENT PROGRAM Troup Project: 0009975 Type Work: Roundabout Descp:I-85 @ SR 18 Length: 0.30 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 938,469 $0 6 Project Details: On Freight/GRIP Network. Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP Federal $938,469 State $0 Other $0 Total $938,469 Project: 0010623 Type Work: TE-Bike/Ped Facility Descp:SR 14; CS 659/CS 687/9TH ST & CS 661/8TH ST @ 3 LOC - PH III Length: 0.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 625,000 $0 1 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $500,000 State $0 Other $125,000 Total $625,000 Project: 322250- Type Work: Widening Descp:SR 1/US 27/LAGRANGE FM AUBURN ST TO SR 219/MORGAN ST Lanes: Exist. 2 Prop. 4 Length: 1.42 Phase ROW CST UTL Fund NHPP NHPP Local Year Federal 2016 $14,992,580 After 2018 $6,998,140 After 2018 $0 State $3,748,145 $1,749,535 $0 Other $0 $0 $1,338,975 Total Project Cost: Total Project Authorizations: Total Parcels: $ 28,827,375 $0 179 Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help enhance economic development and will reduce crash frequency. Total $18,740,725 $8,747,675 $1,338,975 Project: 342870- Type Work: Replace Bridge Descp:CR 296/HAMMETT ROAD @ WEST POINT LAKE TRIB. N OF LAGRANGE Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $300,000 $10,824 $510,000 $10,200 340 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 343455- Type Work: Replace Bridge Descp:CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE Length: 0.20 Phase ROW CST Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,306,255 $0 11 Fund Local STP Year LOCL 2017 Federal $0 $2,395,404 State $0 $598,851 Other $312,000 $0 Total $312,000 $2,994,255 Project: M004517 Type Work: Signing Descp:I-185 @ 16 LOCS - SIGN UPGRADES Length: 0.00 Phase PE CST Fund NHPP NHPP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,943,886 $0 0 Project Details: In Freight/GRIP Network. Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $80,000 $6,863,886 State $0 $0 Other $0 $0 Total $80,000 $6,863,886 Also in Harris, Muscogee County Project: M004521 Type Work: Signing Descp:I-85 @ 12 LOCS - SIGN UPGRADES Length: 4.80 Phase PE CST Fund NHPP NHPP Year LUMP LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,831,907 $0 0 Project Details: In Freight/GRIP Network. Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $80,000 $3,751,907 State $0 $0 Other $0 $0 Total $80,000 $3,751,907 Also in Coweta County Project: M004891 Type Work: Resurface & Maintenance Descp:SR 219 FROM SR 14 CONN TO CS 718/SOUTH CHILTON AVE Length: 1.68 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 272,880 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $218,304 State $54,576 Other $0 Total $272,880 341 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004945 Type Work: Resurface & Maintenance Descp:SR 14 FROM ALABAMA STATE LINE TO SR 18 Length: 0.87 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 426,771 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $341,417 State $85,354 Other $0 Total $426,771 Project: M004953 Type Work: Resurface & Maintenance Descp:SR 14 FROM SR 18 TO N OF CS 1187/MEDICAL PKWY Length: 14.33 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,208,344 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,566,675 State $641,669 Other $0 Total $3,208,344 Project: M004954 Type Work: Resurface & Maintenance Descp:SR 109 FROM SR 1 TO MERIWETHER COUNTY LINE Length: 9.79 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,830,813 $0 0 Project Details: On Freight Network Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,464,650 State $366,163 Other $0 Total $1,830,813 Project: M004985 Type Work: Resurface & Maintenance Descp:SR 1 FROM SR 219 TO 0.10 MI N OF CR 758/FERNWOOD DRIVE Length: 4.20 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,673,968 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,339,174 State $334,794 Other $0 Total $1,673,968 342 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005024 Type Work: Resurface & Maintenance Descp:SR 14 FROM E OF CS 1135/DAVIS ROAD TO COWETA COUNTY LINE Length: 14.55 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,460,840 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $3,568,672 State $892,168 Other $0 Total $4,460,840 Project: M005025 Type Work: Resurface & Maintenance Descp:SR 18 FROM SR 14 TO I-85 Length: 1.57 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 392,861 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $314,289 State $78,572 Other $0 Total $392,861 Project: M005085 Type Work: Resurface & Maintenance Descp:SR 103 FROM SR 219/HARRIS TO SR 18/TROUP Length: 13.96 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,409,566 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,127,653 State $281,913 Other $0 Total $1,409,566 Also in Harris County Project: M005093 Type Work: Resurface & Maintenance Descp:SR 100 FROM SR 14 TO COWETA COUNTY LINE Length: 3.56 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 390,704 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $312,563 State $78,141 Other $0 Total $390,704 Project: M005103 Type Work: Resurface & Maintenance Descp:SR 18 FROM E OF I-85 TO HARRIS COUNTY LINE Length: 6.33 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 47,627 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $38,102 State $9,525 Other $0 Total $47,627 Also in Harris County 343 STATE TRANSPORTATION IMPROVEMENT PROGRAM Troup Totals Summary County Summary excludes lump sum projects. Project PI# 322250342870343455- Year 2016 2016 2017 Phase ROW ROW CST Fund NHPP Local STP Federal $14,992,580 $0 $2,395,404 State $3,748,145 $0 $598,851 Other $0 $10,824 $0 Total $18,740,725 $10,824 $2,994,255 $17,387,984 $4,346,996 $10,824 $21,745,805 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 344 STATE TRANSPORTATION IMPROVEMENT PROGRAM Turner Project: 0000311 Type Work: Widening Descp:SR 107/SR 112 FROM CR 250 TO I-75 IN ASHBURN Lanes: Exist. 2 Prop. 4 Length: 7.90 Total Project Cost: Total Project Authorizations: Total Parcels: $ 29,446,351 $ 50,000 56 Phase PE ROW CST UTL Fund STP STP STP STP Year Federal 2014 $40,000 2018 $3,030,810 After 2018 $19,817,330 After 2018 $668,940 State $10,000 $757,703 $4,954,333 $167,235 Project Details: Widen from 2 to 4 lanes reconstruct intersection with SR 112 reduce crash frequency and congestion enhance economic development Other $0 $0 $0 $0 Total $50,000 $3,788,513 $24,771,663 $836,176 Project: 0000314 Type Work: Widening Descp:SR 107 FROM CR 250/TURNER COUNTY TO CR 264/IRWIN COUNTY Lanes: Exist. 2 Prop. 4 Length: 7.10 Phase ROW CST UTL Fund STP STP STP Year Federal 2018 $3,643,900 After 2018 $28,865,254 After 2018 $720,865 State $910,975 $7,216,313 $180,216 Other $0 $0 $0 Total $4,554,875 $36,081,567 $901,081 Total Project Cost: Total Project Authorizations: Total Parcels: $ 41,537,522 $0 46 Project Details: widen from 2 to 4 lanes, improve mobility and reduce congestion, enhance economic development and reduce crash frequency- Also in Irwin County Project: 0007579 Type Work: Sidewalks Descp:CS 500/CARLOS AVE FM TOOMBS ST TO JEFFERSON ST IN ASHBURN Length: 0.16 Total Project Cost: Total Project Authorizations: Total Parcels: $ 534,578 $0 0 Phase CST Fund HPP Year 2015 Federal $401,950 State $0 Other $132,628 Total $534,578 Project: 0007596 Type Work: Streetscapes Descp:SR 7 & SR 112 FM GORDON ST TO EAST COLLEGE ST IN ASHBURN Length: 0.15 Total Project Cost: Total Project Authorizations: Total Parcels: $ 196,070 $0 0 Phase CST Fund HPP Year 2016 Federal $155,980 State $0 Other $40,090 Total $196,070 345 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0010675 Type Work: TE-Bike/Ped Facility Descp:SR 112 FROM SR 7/US 41 TO CS 503/JOHNSON STREET Length: 0.19 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 625,000 $0 3 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $500,000 State $0 Other $125,000 Total $625,000 Project: 0011646 Type Work: RRX Consolidation Descp:CS 618/WILLIS STREET @ NS #723712Y & #925521X Length: 0.09 Phase CST Fund HSIP Year LUMP Federal $15,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 15,000 $0 0 Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2015 - FY 2018 State $0 Other $0 Total $15,000 Project: M004723 Type Work: Bridges Descp:I-75 @ HAT CREEK - SCOUR REHAB Length: 0.20 Phase CST Fund NHPP Year LUMP Federal $270,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 300,000 $0 0 Project Details: Scour rehab and maintenance repairs - on State Freight/GRIP Network Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 - FY 2018 State $30,000 Other $0 Total $300,000 Project: M004805 Type Work: Resurface & Maintenance Descp:I-75 FROM SR 159/TURNER TO N OF CR 355/OLD HATLEY RD/CRISP Length: 14.37 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 50,000 $0 0 Project Details: On Freight/GRIP Network Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $45,000 State $5,000 Other $0 Total $50,000 Also in Crisp County 346 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004807 Type Work: Resurface & Maintenance Descp:I-75 FM S OF CR 204/SOUTHWELL RD/TIFT TO S OF SR 32/TURNER Length: 19.00 Phase PE Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 50,000 $0 0 Project Details: On Freight/GRIP Network Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $45,000 State $5,000 Other $0 Total $50,000 Also in Tift County Turner Totals Summary County Summary excludes lump sum projects. Project PI# 0000311 0000314 0007579 0007596 Year 2018 2018 2015 2016 Phase ROW ROW CST CST Fund STP STP HPP HPP Federal $3,030,810 $1,530,438 $401,950 $155,980 State $757,703 $382,609 $0 $0 Other $0 $0 $132,628 $40,090 Total $3,788,513 $1,913,047 $534,578 $196,070 $5,119,178 $1,140,312 $172,718 $6,432,207 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 347 STATE TRANSPORTATION IMPROVEMENT PROGRAM Twiggs Project: 0007054 Type Work: Replace Bridge Descp:SR 19 @ CSX RR 2.8 MI SE OF DRY BRANCH Length: 0.56 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,403,384 $0 5 Phase CST UTL Fund STP STP Year 2015 2015 Federal $2,481,542 $241,165 State $620,386 $60,291 Other $0 $0 Total $3,101,928 $301,456 Project: 0008416 Type Work: Replace Bridge Descp:CR 189/BULLARD @ FLAT CREEK Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 633,024 $0 0 Phase PE ROW CST UTL Fund STP Local STP STP Year LUMP 2016 LUMP LUMP Federal $81,600 $0 $408,000 $8,160 State $20,400 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $102,000 $10,824 $510,000 $10,200 Project: M004188 Type Work: Signing Descp:I-16 @ 5 LOCS & I-75 @ 4 LOCS Length: 3.60 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,300,000 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,300,000 State $0 Other $0 Total $1,300,000 Also in Bibb County Twiggs Totals Summary County Summary excludes lump sum projects. Project PI# 0007054 0007054 0008416 Year 2015 2015 2016 Phase CST UTL ROW Fund STP STP Local Federal $2,481,542 $241,165 $0 State $620,386 $60,291 $0 Other $0 $0 $10,824 Total $3,101,928 $301,456 $10,824 $2,722,707 $680,677 $10,824 $3,414,208 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 348 STATE TRANSPORTATION IMPROVEMENT PROGRAM Union Project: 0007055 Type Work: Replace Bridge Descp:SR 180 @ SLAUGHTER CREEK Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,616,623 $ 433,190 0 Phase PE ROW CST UTL Fund Bridge STP STP STP Year 2014 2016 2018 2018 Federal $346,552 $39,507 $4,688,990 $218,250 State $86,638 $9,877 $1,172,247 $54,563 Other $0 $0 $0 $0 Total $433,190 $49,383 $5,861,237 $272,813 Project: 0007495 Type Work: Pedestrian Crossings Descp:PEDESTRIAN UPGRADES @ 19 SR LOCATIONS IN DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,369,911 $ 580,000 18 Phase PE ROW CST UTL Fund HSIP HSIP HSIP HSIP Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year 2014 2014 LUMP LUMP Federal $18,000 $504,000 $2,429,920 $81,000 State $2,000 $56,000 $269,991 $9,000 Other $0 $0 $0 $0 Total $20,000 $560,000 $2,699,911 $90,000 Also in Lumpkin, Towns, White County Project: 122900- Type Work: Widening Descp:SR 515/2/US 76 FM E BLAIRSVILLE TO YOUNG HARRIS BP@CL/CORR A Lanes: Exist. 2 Prop. 4 Length: 5.87 Phase PE ROW CST Fund App Dev App Dev App Dev Year 2014 2016 2017 Federal $500,000 $32,275,000 $17,161,000 State $0 $0 $0 Total Project Cost: Total Project Authorizations: Total Parcels: $ 49,936,000 $ 500,000 250 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development - Project on GRIP corridor & State Freight Network if on GRIP/FN Other $0 $0 $0 Total $500,000 $32,275,000 $17,161,000 Union Totals Summary County Summary excludes lump sum projects. Project PI# 0007055 0007055 0007055 122900122900- Year 2016 2018 2018 2016 2017 Phase ROW CST UTL ROW CST Fund STP STP STP App Dev App Dev Federal $39,507 $4,688,990 $218,250 $32,275,000 $17,161,000 State $9,877 $1,172,247 $54,563 $0 $0 Other $0 $0 $0 $0 $0 Total $49,383 $5,861,237 $272,813 $32,275,000 $17,161,000 $54,382,746 $1,236,687 $0 $55,619,433 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 349 STATE TRANSPORTATION IMPROVEMENT PROGRAM Upson Project: 0000297 Type Work: Roadway Project Descp:SR 3/US 19 FM CR 73/EAST-WEST COUNTY RD TO CR 8/ATWATER RD Length: 2.00 Phase ROW CST UTL Fund NHPP NHPP NHPP Year 2015 2017 2017 Federal $9,887,472 $7,340,489 $574,929 State $2,471,868 $1,835,122 $143,732 Total Project Cost: Total Project Authorizations: Total Parcels: $ 22,253,613 $0 95 Project Details: Widen lanes to 12' - add raised median, auxiliary lanes at major intersections, and sidewalks - realign Delray Rd and install new traffic signal at intersection - reduce crash frequency - improve operation conditions on GRIP corridor. Project: 0010624 Type Work: TE-Bike/Ped Facility Descp:SR 3 FROM CS 602/R STREET TO CS 609/PARK DRIVE Length: 0.43 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 650,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $520,000 State $0 Other $0 $0 $0 Total $12,359,340 $9,175,611 $718,662 Other $130,000 Total $650,000 Project: M005058 Type Work: Resurface & Maintenance Descp:SR 3 SO FROM CS 652/POPLAR DRIVE TO SR 3 IN THOMASTON Length: 1.76 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 539,593 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $431,674 State $107,919 Other $0 Total $539,593 Project: M005190 Type Work: Resurface & Maintenance Descp:SR 74 FROM SR 18/PIKE TO POTATO CREEK/UPSON Length: 12.31 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,296,982 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,037,586 State $259,396 Other $0 Total $1,296,982 Also in Pike County 350 STATE TRANSPORTATION IMPROVEMENT PROGRAM Upson Totals Summary County Summary excludes lump sum projects. Project PI# 0000297 0000297 0000297 Year 2015 2017 2017 Phase ROW CST UTL Fund NHPP NHPP NHPP Federal $9,887,472 $7,340,489 $574,929 State $2,471,868 $1,835,122 $143,732 Other $0 $0 $0 Total $12,359,340 $9,175,611 $718,662 $17,802,890 $4,450,723 $0 $22,253,613 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 351 STATE TRANSPORTATION IMPROVEMENT PROGRAM Walker Project: 0007543 Type Work: Miscellaneous Improvements Descp:TRANSPORTATION IMPROVEMENTS IN WALKER COUNTY Length: 0.00 Phase PE CST Fund Local HPP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,091,184 $ 22,000 0 Year 2014 2015 Federal $0 $1,655,347 State $0 $0 Other $22,000 $413,837 Total $22,000 $2,069,184 Project: 0010448 Type Work: Signals Descp:SR 1 @ 3 LOC; SR 2 @ 4 LOC; SR 136 @ 3 LOC &SR 146 @ 2 LOC Length: 4.80 Phase ROW CST UTL Fund STP STP STP Year LUMP LUMP LUMP Federal $985,000 $1,595,238 $395,000 State $0 $0 $0 Other $0 $0 $0 Total $985,000 $1,595,238 $395,000 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,975,238 $0 26 Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2015 - FY 2018 Also in Catoosa, Dade County Project: M005211 Type Work: Resurface & Maintenance Descp:SR 95 FROM SR 151 TO SR 1 Length: 7.78 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,865,679 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,492,543 State $373,136 Other $0 Total $1,865,679 Project PI# 0007543 Year 2015 Walker Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Phase Fund Federal State Other CST HPP $1,655,347 $0 $413,837 Total $2,069,184 $1,655,347 $0 $413,837 $2,069,184 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 352 STATE TRANSPORTATION IMPROVEMENT PROGRAM Walton Project: 0010199 Type Work: TE-Bike/Ped Facility Descp:SR 11 FROM BLUE WILLOW INN TO HIGHTOWER TRAIL Length: 0.23 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 500,000 $0 2 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $400,000 State $0 Other $100,000 Total $500,000 Project: 0012674 Type Work: Signals Descp:SR 10; SR 10BU; SR 11; SR 20; SR 81; SR 138@15 LOC IN WALTON Length: 0.00 Phase ROW CST Fund CMAQ CMAQ Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,100,000 $0 0 Year LUMP LUMP Federal $600,000 $1,080,000 State $150,000 $270,000 Other $0 $0 Total $750,000 $1,350,000 Project: 132980- Type Work: Replace Bridge Descp:SR 11 @ CSX RAILROAD IN SOUTH SOCIAL CIRCLE Length: 0.23 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,567,185 $ 725,000 14 Phase PE ROW CST Fund STP Bridge STP Year 2014 2014 2016 Federal $180,000 $400,000 $1,473,748 State $45,000 $100,000 $368,437 Other $0 $0 $0 Total $225,000 $500,000 $1,842,185 Project: 132981- Type Work: Replace Bridge Descp:SR 11 @ APALACHEE RIVER 7.5 MILES NORTH OF MONROE Length: 0.57 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,507,500 $0 7 Phase ROW CST UTL Fund STP STP STP Year 2015 2017 2017 Federal $170,000 $1,800,000 $36,000 State $42,500 $450,000 $9,000 Other $0 $0 $0 Total $212,500 $2,250,000 $45,000 Project: M004660 Type Work: Resurface & Maintenance Descp:SR 10 FM E OF CS 804/CHERRY HILL ROAD TO OCONEE COUNTY LINE Length: 7.35 Phase CST Fund STP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,601,876 $ 3,601,876 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,881,501 State $720,375 Other $0 Total $3,601,876 353 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005142 Type Work: Resurface & Maintenance Descp:SR 12 FROM SR 142 TO MORGAN COUNTY LINE Length: 9.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 979,848 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $783,878 State $195,970 Other $0 Total $979,848 Also in Newton County Project: T004091 Type Work: Transit Projects Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 43,346 $0 0 Project Details: Moved State Match to Other/Local Phase Fund CST Transit Year 2015 Federal $34,677 State $0 Other $8,669 Total $43,346 Project: T004410 Type Work: Transit Projects Descp:FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 45,000 $0 0 Phase Fund CST Transit Year 2016 Federal $36,000 State $0 Other $9,000 Total $45,000 Project: T004843 Type Work: Transit Projects Descp:FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 54,000 $0 0 Phase Fund CST Transit Year 2017 Federal $43,200 State $0 Other $10,800 Total $54,000 354 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project PI# Walton Totals Summary County Summary excludes lump sum projects. This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP. Year Phase Fund Federal State Other Total 132980132981132981132981T004091 T004410 T004843 2016 2015 2017 2017 2015 2016 2017 CST ROW CST UTL CST CST CST STP STP STP STP Transit Transit Transit $1,473,748 $170,000 $1,800,000 $36,000 $34,677 $36,000 $43,200 $368,437 $42,500 $450,000 $9,000 $0 $0 $0 $0 $0 $0 $0 $8,669 $9,000 $10,800 $1,842,185 $212,500 $2,250,000 $45,000 $43,346 $45,000 $54,000 $3,593,625 $869,937 $28,469 $4,492,031 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 355 STATE TRANSPORTATION IMPROVEMENT PROGRAM Ware Project: 0010293 Type Work: Realignment Descp:SR 122 FM W OF CR 39/CORBITT RD TO E OF CR 68/PINE VALLEY RD Length: 0.90 Phase ROW CST Fund HSIP HSIP Year LUMP LUMP Federal $861,300 $1,527,530 State $95,700 $169,726 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,654,256 $0 5 Project Details: Project will improve mobility and connectivity within the transportation network and enhance economic development opportunities locally and within the region. Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Other $0 $0 Total $957,000 $1,697,256 Project: 0011688 Type Work: Replace Bridge Descp:SR 158 @ SATILLA RIVER 9 MI NW OF WAYCROSS Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 4,435,668 $ 357,000 0 Phase PE ROW CST UTL Fund STP STP STP STP Year 2014 2016 2018 2018 Federal $285,600 $127,345 $3,091,426 $44,163 State $71,400 $31,836 $772,857 $11,041 Other $0 $0 $0 $0 Total $357,000 $159,181 $3,864,283 $55,204 Project: 0012845 Type Work: Widening Descp:SR 38/US 84 FROM PEAGLER CROSSING ROAD TO FIRE TOWER ROAD Lanes: Exist. 2 Prop. 4 Length: 2.83 Phase PE CST UTL Fund NHS NHPP NHPP Year 2014 2015 2015 Federal $40,000 $3,563,200 $1,506,496 State $10,000 $890,800 $376,624 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,387,120 $ 50,000 0 Project Details: Widen from 2 to 4 lanes-improve operation and mobility-enhance economic development-on a GRIP corridor-on a State Freight corridor Other $0 $0 $0 Total $50,000 $4,454,000 $1,883,120 Project: 422120- Type Work: Widening Descp:SR 38/US 84 FROM W OF WOODYARD CREEK TO W OF GREASY BRANCH Lanes: Exist. 2 Prop. 4 Length: 11.60 Phase PE CST UTL Fund NHPP NHPP NHPP Year 2015 2015 2015 Federal $3,680,000 $44,391,370 $785,298 State $920,000 $11,097,843 $196,325 Other $0 $0 $0 Total $4,600,000 $55,489,213 $981,623 Total Project Cost: Total Project Authorizations: Total Parcels: $ 61,070,835 $0 114 Project Details: widen from 2 to 4 lanes- new alignment will bypass Argyle on north side- bridges will be replaced-improve mobility and reduce congestion-enhance economic development- reduce crash frequency-GRIP-State Freight Corridor Also in Clinch County 356 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 422125- Type Work: Replace Bridge Descp:SR 38/US 84 @ SUWANNEE CRK Lanes: Exist. 2 Prop. 4 Length: 0.10 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,742,670 $0 0 Phase CST Fund NHPP Year 2015 Federal $1,394,136 State $348,534 Other $0 Total $1,742,670 Project: 522770- Type Work: Widening Descp:SR 38/US 84 FM W OF GREASY BRANCH CK TO W OF CR 88/RUSKIN RD Lanes: Exist. 2 Prop. 4 Length: 7.60 Phase CST Fund NHPP Year 2015 Federal $18,630,509 State $4,657,627 Total Project Cost: Total Project Authorizations: Total Parcels: $ 23,288,136 $0 69 Project Details: Widen from two to four lanes-improve operation and mobility-enhance economic development-on GRIP corridor-on State Freight corridor Project: 522775- Type Work: Replace Bridge Descp:SR 38/US 84 @ GREASY BRANCH; LITTLE & BIG ALLIGATOR CREEK Lanes: Exist. 2 Prop. 4 Length: 0.10 Phase PE CST Fund NHPP NHPP Year 2015 2015 Federal $40,000 $10,786,118 State $10,000 $2,696,530 Total Project Cost: Total Project Authorizations: Total Parcels: $ 13,532,648 $0 0 Project Details: Widen bridge from two to four lanes-improve operation and mobility-enhance economic development-on GRIP corridor-on State Freight corridor Project: 522780- Type Work: Widening Descp:SR 38/US 84 FM W OF CR 88/RUSKIN RD TO E OF CR 294/WADLEY RD Lanes: Exist. 2 Prop. 4 Length: 6.06 Phase CST UTL Fund NHPP Local Year 2016 2016 Federal $15,989,662 $0 State $3,997,416 $0 Total Project Cost: Total Project Authorizations: Total Parcels: $ 20,507,278 $0 132 Project Details: Widen from 2 to 4 lanes-improve operation and mobility-reduce crash frequency-enhance economic development-on GRIP corridor-on State Freight corridor Project: M004592 Type Work: Resurface & Maintenance Descp:SR 4BU/US 1BU FM CS 911/CARSWELL AVE TO CR 358/WARING STREET Length: 2.17 Phase CST Fund NHPP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 584,259 $ 584,259 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $467,407 State $116,852 Other $0 Total $23,288,136 Other $0 $0 Total $50,000 $13,482,648 Other $0 $520,200 Total $19,987,078 $520,200 Other $0 Total $584,259 357 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005010 Type Work: Resurface & Maintenance Descp:SR 4 FROM CS 978/PAFFORD ROAD TO SR 520 Length: 0.70 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 290,850 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $232,680 State $58,170 Other $0 Total $290,850 Project: M005011 Type Work: Resurface & Maintenance Descp:SR 4BU FROM SR 4 TO CS 673/HARRISON STREET Length: 0.50 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 207,750 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $166,200 State $41,550 Other $0 Total $207,750 Project: M005023 Type Work: Resurface & Maintenance Descp:SR 38 FROM CR 71/AMMONS ROAD TO SR 520 Length: 8.53 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,875,550 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,500,440 State $375,110 Other $0 Total $1,875,550 Project: M005125 Type Work: Resurface & Maintenance Descp:SR 520 FM W OF CR 112/ANITA ST TO W OF CR 392/HATCHER POINT Length: 5.00 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,077,500 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,662,000 State $415,500 Other $0 Total $2,077,500 358 STATE TRANSPORTATION IMPROVEMENT PROGRAM Ware Totals Summary County Summary excludes lump sum projects. Project PI# 0011688 0011688 0011688 0012845 0012845 422120422120422120422125522770522775522775522780522780- Year 2016 2018 2018 2015 2015 2015 2015 2015 2015 2015 2015 2015 2016 2016 Phase ROW CST UTL CST UTL PE CST UTL CST CST PE CST CST UTL Fund STP STP STP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP Local Federal $127,345 $3,091,426 $44,163 $3,563,200 $1,506,496 $1,288,000 $15,536,980 $274,854 $1,394,136 $18,630,509 $40,000 $10,786,118 $15,989,662 $0 State $31,836 $772,857 $11,041 $890,800 $376,624 $322,000 $3,884,245 $68,714 $348,534 $4,657,627 $10,000 $2,696,530 $3,997,416 $0 Other $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $520,200 Total $159,181 $3,864,283 $55,204 $4,454,000 $1,883,120 $1,610,000 $19,421,224 $343,568 $1,742,670 $23,288,136 $50,000 $13,482,648 $19,987,078 $520,200 $72,272,889 $18,068,222 $520,200 $90,861,311 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 359 STATE TRANSPORTATION IMPROVEMENT PROGRAM Warren Project: 0008680 Type Work: Frontage Roads Descp:I-20 FRONTAGE RD FM CR 187/RIDGE RD TO SR 80 -PHASE II - TIA Lanes: Exist. 0 Prop. 2 Length: 3.39 Total Project Cost: Total Project Authorizations: Total Parcels: $ 13,262,000 $ 2,500,000 0 Phase PE ROW CST CST Fund HPP Local State Local Year 2015 2017 2014 After 2018 Federal $1,398,400 $0 $0 $0 State $0 $0 $0 $0 Other $349,600 $984,000 $2,500,000 $8,030,000 Project Details: New frontage road location - Improve mobility & connectivity enhance economic development opportunities Project: 0010844 Type Work: Frontage Roads Descp:I-20 FRONTAGE RD FM CADLEY ROAD TO RIDGE ROAD - PH I - TIA Lanes: Exist. 0 Prop. 2 Length: 2.68 Total Project Cost: Total Project Authorizations: Total Parcels: $ 12,602,311 $ 2,500,000 0 Phase ROW CST CST CST Fund Local State HPP HPP Year LOCL 2014 2017 2017 Federal $0 $0 $3,599,601 $3,012,648 State $0 $0 $0 $0 Other $1,837,000 $2,500,000 $899,900 $753,162 Project Details: New frontage road location - Improve mobility & connectivity enhance economic development opportunities Project: 0012747 Type Work: Preliminary Engineering Descp:CS 562/BAKER STREET @ CSX #279522W Length: 0.20 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 165,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $25,000 $140,000 State $0 $0 Other $0 $0 Total $1,748,000 $984,000 $2,500,000 $8,030,000 Total $1,837,000 $2,500,000 $4,499,501 $3,765,809 Total $25,000 $140,000 Project: M004920 Type Work: Resurface & Maintenance Descp:I-20 FROM SR 44/GREENE TO SR10/SR 17/MCDUFFIE Length: 41.95 Phase CST Fund NHPP Year 2015 Total Project Cost: Total Project Authorizations: Total Parcels: $ 8,191,045 $ 8,191,045 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $7,371,941 State $819,105 Other $0 Total $8,191,045 Also in Greene, McDuffie, Taliaferro County 360 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005042 Type Work: Resurface & Maintenance Descp:SR 17 FROM JEFFERSON COUNTY LINE TO SR 12 Length: 13.60 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,089,664 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,671,731 State $417,933 Other $0 Total $2,089,664 Also in McDuffie County Project: M005099 Type Work: Resurface & Maintenance Descp:SR 12 FROM SR 12 BYPASS TO MCDUFFIE COUNTY LINE Length: 6.39 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,590,576 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,272,461 State $318,115 Other $0 Total $1,590,576 Warren Totals Summary County Summary excludes lump sum projects. Project PI# 0008680 0008680 0010844 0010844 Year 2015 2017 2017 2017 Phase PE ROW CST CST Fund HPP Local HPP HPP Federal $1,398,400 $0 $3,012,648 $3,599,601 State $0 $0 $0 $0 Other $349,600 $984,000 $753,162 $899,900 Total $1,748,000 $984,000 $3,765,809 $4,499,501 $8,010,649 $0 $2,986,662 $10,997,311 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 361 STATE TRANSPORTATION IMPROVEMENT PROGRAM Washington Project: 0006463 Type Work: Pedestrian Crossings Descp:SR 15 @ 3 LOCS & SR 24 @ 2 LOCS PEDESTRIAN UPGRADES Length: 2.00 Phase PE CST Fund Safety HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 975,000 $ 350,000 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year 2014 LUMP Federal $315,000 $562,500 State $35,000 $62,500 Other $0 $0 Project: 0010715 Type Work: TE-Rehab Hist Trans Bldg Descp:TENNILLE FREIGHT DEPOT REHAB & STREETSCAPE @ 4 LOCS - PH II Length: 0.21 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 625,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $500,000 State $0 Other $125,000 Project: 231170- Type Work: Replace Bridge Descp:CR 376/HAMBURG RD N JCT W OF SR 102 @ COWPEN CRK Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $350,000 $625,000 Total $625,000 Total $300,000 $10,824 $510,000 $10,200 Project: 245080- Type Work: New Construction Descp:SR 15 BYP FROM SR 15 TO SR 242 E OF TENNILLE Lanes: Exist. 0 Prop. 4 Length: 3.70 Phase ROW CST UTL Fund STP STP STP Year Federal 2017 $3,258,565 After 2018 $16,820,463 After 2018 $105,168 State $814,641 $4,205,116 $26,292 Total Project Cost: Total Project Authorizations: Total Parcels: $ 25,230,245 $0 85 Project Details: New location of a 4 lane bypass - Improve mobility & connectivity enhance economic development opportunities Project: M004987 Type Work: Resurface & Maintenance Descp:SR 15 FROM JOHNSON COUNTY LINE TO NS #732742P Length: 11.82 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,260,779 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,808,623 State $452,156 Other $0 $0 $0 Total $4,073,207 $21,025,578 $131,460 Other $0 Total $2,260,779 362 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M005067 Type Work: Resurface & Maintenance Descp:SR 15 FROM NS #7327429 TO 0.05 MI N OF CS 568/JERNIGAN ST Length: 3.30 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 373,427 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $298,742 State $74,685 Other $0 Total $373,427 Project: M005132 Type Work: Resurface & Maintenance Descp:SR 242 SPUR FROM SR 242 TO CS 740/KAOLIN ROAD Length: 2.45 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 450,687 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $360,550 State $90,137 Other $0 Total $450,687 Project: M005154 Type Work: Resurface & Maintenance Descp:SR 24 FROM JEFFERSON COUNTY LINE TO SR 231 Length: 4.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 421,440 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $337,152 State $84,288 Other $0 Total $421,440 Washington Totals Summary County Summary excludes lump sum projects. Project PI# 231170245080- Year 2016 2017 Phase ROW ROW Fund Local STP Federal $0 $3,258,565 State $0 $814,641 Other $10,824 $0 Total $10,824 $4,073,207 $3,258,565 $814,641 $10,824 $4,084,031 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 363 STATE TRANSPORTATION IMPROVEMENT PROGRAM Wayne Project: 0013197 Type Work: Roundabout Descp:CR 396/RAYONIER ROAD @ CR 392/SPRING GROVE ROAD - HRRR Length: 0.60 Phase CST Fund Safety Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,500,000 $0 0 Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2015 - FY 2018 Year LUMP Federal $1,500,000 State $0 Other $0 Total $1,500,000 364 STATE TRANSPORTATION IMPROVEMENT PROGRAM Wheeler Project: 0007572 Type Work: Sidewalks Descp:SR 30 & CR 40 SIDEWALKS & SPEED MONITORING SYSTEM IN ALAMO Length: 0.67 Total Project Cost: Total Project Authorizations: Total Parcels: $ 246,319 $0 0 Phase CST Fund HPP Year 2018 Federal $197,055 State $0 Other $49,264 Total $246,319 Project: 0008417 Type Work: Replace Bridge Descp:CR 178/SNOWHILL ROAD @ OCHWALKEE CREEK Length: 0.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,810,229 $0 0 Phase PE ROW CST UTL Fund STP Local STP Local Year 2015 2016 After 2018 After 2018 Federal $176,653 $0 $1,726,285 $0 State $44,163 $0 $431,571 $0 Other $0 $34,116 $0 $397,441 Total $220,816 $34,116 $2,157,856 $397,441 Project: 532342- Type Work: Replace Bridge Descp:CR 197 @ ALLIGATOR CREEK S OF GLENWOOD Length: 0.20 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 0 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $300,000 $10,824 $510,000 $10,200 Wheeler Totals Summary County Summary excludes lump sum projects. Project PI# 0007572 0008417 0008417 532342- Year 2018 2015 2016 2016 Phase CST PE ROW ROW Fund HPP STP Local Local Federal $197,055 $176,653 $0 $0 State $0 $44,163 $0 $0 Other $49,264 $0 $34,116 $10,824 Total $246,319 $220,816 $34,116 $10,824 $373,708 $44,163 $94,204 $512,075 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 365 STATE TRANSPORTATION IMPROVEMENT PROGRAM White Project: 0001935 Type Work: TE-Scenic Hwy/Welcome Ctr Descp:HARDMAN FARM VISITOR CENTER - PARKING LOTS&PEDESTRIAN TRAIL Length: 0.00 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 721,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $576,800 State $0 Other $144,200 Total $721,000 Project: 0007495 Type Work: Pedestrian Crossings Descp:PEDESTRIAN UPGRADES @ 19 SR LOCATIONS IN DISTRICT 1 Length: 0.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,369,911 $ 580,000 18 Phase PE ROW CST UTL Fund HSIP HSIP HSIP HSIP Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year 2014 2014 LUMP LUMP Federal $18,000 $504,000 $2,429,920 $81,000 State $2,000 $56,000 $269,991 $9,000 Other $0 $0 $0 $0 Total $20,000 $560,000 $2,699,911 $90,000 Also in Lumpkin, Towns, Union County Project: 0010194 Type Work: New Construction Descp:WEST CLEVELAND BYP FROM N OF SR 115 TO E OF SR 11 - PH II Lanes: Exist. 0 Prop. 4 Length: 1.73 Phase CST UTL Fund STP STP Year 2015 2015 Federal $14,576,915 $1,035,406 State $3,644,229 $258,852 Total Project Cost: Total Project Authorizations: Total Parcels: $ 19,515,402 $0 0 Project Details: New location of a 4 lane bypass - Improve mobility & connectivity enhance economic development opportunities Other $0 $0 Total $18,221,144 $1,294,258 Project: 0010684 Type Work: TE-Bike/Ped Facility Descp:SR 17/SR 75 @ CHATTAHOOCHEE RIVER IN HELEN Length: 0.20 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 1 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $300,000 State $0 Other $75,000 Total $375,000 366 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004775 Type Work: Resurface & Maintenance Descp:SR 75 ALT FROM SR 11 TO SR 75 Length: 8.10 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 875,850 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $700,680 State $175,170 Other $0 Total $875,850 Project: M005064 Type Work: Resurface & Maintenance Descp:SR 11 FROM SR 115 TO LUMPKIN COUNTY LINE Length: 8.49 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 2,116,557 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,693,246 State $423,311 Other $0 Total $2,116,557 Project: M005179 Type Work: Resurface & Maintenance Descp:SR 75 FROM CR 88/ASBESTOS ROAD TO SR 17 Length: 4.42 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,346,786 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $1,077,429 State $269,357 Other $0 Total $1,346,786 Project: M005180 Type Work: Resurface & Maintenance Descp:SR 17 FROM SR 75 TO SR 75 ALT Length: 3.28 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 999,425 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $799,540 State $199,885 Other $0 Total $999,425 White Totals Summary County Summary excludes lump sum projects. Project PI# 0010194 0010194 Year 2015 2015 Phase CST UTL Fund STP STP Federal $14,576,915 $1,035,406 State $3,644,229 $258,852 Other $0 $0 Total $18,221,144 $1,294,258 $15,612,321 $3,903,080 $0 $19,515,402 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 367 STATE TRANSPORTATION IMPROVEMENT PROGRAM Wilcox Project: 0013185 Type Work: RRX Warning Device Descp:CS 644/BOWEN STREET @ HGR # 635232V IN ABBEVILLE Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 200,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $200,000 State $0 Other $0 Total $200,000 368 STATE TRANSPORTATION IMPROVEMENT PROGRAM Wilkes Project: 222255- Type Work: Widening Descp:SR 10/SR 17 FM SMITH MILL RD TO WASHINGTON BYP/WILKES - TIA Lanes: Exist. 2 Prop. 4 Length: 12.00 Total Project Cost: Total Project Authorizations: Total Parcels: $ 38,105,012 $ 4,125,000 74 Phase PE CST CST UTL Fund NHPP State NHPP NHPP Year 2014 2014 2015 2015 Federal $100,000 $0 $25,534,418 $1,649,592 State $25,000 $0 $6,383,605 $412,398 Other $0 $4,000,000 $0 $0 Total $125,000 $4,000,000 $31,918,023 $2,061,990 Project Details: Widen from 2 to 4 lanes - Provide additional capacity - reduce congestion - improve mobility-reduce crash frequency-enhance economic development - Project on GRIP corridor & State Freight Network if on GRIP/FN Also in McDuffie County Project: 222460- Type Work: Passing Lanes Descp:SR 10:OGLETHORPE 13.7-15;15.3-16.2 &WILKES 0-1.5;5.5-7.0-TIA Lanes: Exist. 2 Prop. 3 Length: 5.32 Phase PE ROW CST Fund State State NHPP Year 2014 2014 2015 Federal $0 $0 $5,082,748 State $0 $0 $1,270,687 Other $100,000 $100,000 $0 Total $100,000 $100,000 $6,353,435 Total Project Cost: Total Project Authorizations: Total Parcels: $ 6,553,435 $ 200,000 60 Project Details: Construct 4 passing lane sections - Passing opportunity improvements to address operational & safety issues Also in Oglethorpe County Project: M004701 Type Work: Resurface & Maintenance Phase CST Descp:SR 44 FROM SR 17BU/WILKES TO SR 79/LINCOLN Length: 15.23 Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 3,103,780 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $2,483,024 State $620,756 Other $0 Total $3,103,780 Also in Lincoln County Project: M004933 Type Work: Resurface & Maintenance Descp:SR 17 FROM SR 47 TO 0.60 MI N OF SR 44 Length: 3.30 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,618,815 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,295,052 State $323,763 Other $0 Total $1,618,815 369 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: M004946 Type Work: Resurface & Maintenance Descp:SR 17BU FROM SR 17 TO SR 10 Length: 2.75 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 265,153 $0 0 Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2015 - FY 2018 Federal $212,122 State $53,031 Other $0 Project: M004969 Type Work: Resurface & Maintenance Descp:SR 10BU FROM SR 10 TO SR 10 - TIA Length: 4.57 Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,409,390 $ 606,906 0 Phase CST CST Fund State STP Year 2014 LUMP Federal $0 $641,987 State $0 $160,497 Other $606,906 $0 Total $265,153 Total $606,906 $802,484 Wilkes Totals Summary County Summary excludes lump sum projects. Project PI# 222255222255222460- Year 2015 2015 2015 Phase CST UTL CST Fund NHPP NHPP NHPP Federal $18,895,470 $1,220,698 $2,947,994 State $4,723,867 $305,174 $736,998 Other $0 $0 $0 Total $23,619,337 $1,525,872 $3,684,992 $23,064,161 $5,766,040 $0 $28,830,201 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 370 STATE TRANSPORTATION IMPROVEMENT PROGRAM Wilkinson Project: 0011762 Type Work: RRX Warning Device Descp:CR 188/MACON ROAD @ NS #732725Y IN MCINTYRE Length: 0.40 Phase CST Fund HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 275,000 $0 0 Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2015 - FY 2018 Year LUMP Federal $275,000 State $0 Other $0 Total $275,000 Project: 0013260 Type Work: Pedestrian Crossings Descp:SR 22; SR 24; SR 29; SR 44 & SR 57 @ 5 LOCS PED UPGRADES Length: 2.00 Phase PE CST Fund HSIP HSIP Total Project Cost: Total Project Authorizations: Total Parcels: $ 795,000 $0 0 Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2015 - FY 2018 Year LUMP LUMP Federal $153,000 $562,500 State $17,000 $62,500 Other $0 $0 Total $170,000 $625,000 Also in Baldwin, Putnam County Project: M005187 Type Work: Resurface & Maintenance Descp:SR 29 FM CR 162/JOHNS GOLDEN RD/WILKINSON TO SR 243/BALDWIN Length: 4.89 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,161,884 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $929,508 State $232,377 Other $0 Total $1,161,884 Also in Baldwin County 371 STATE TRANSPORTATION IMPROVEMENT PROGRAM Worth Project: 0000475 Type Work: Widening Descp:SR 133 FM N OF SR 112 TO N OF CR 459/COUNTY LINE ROAD Lanes: Exist. 2 Prop. 4 Length: 3.40 Total Project Cost: Total Project Authorizations: Total Parcels: $ 20,846,698 $ 161,000 70 Phase PE ROW CST UTL Fund NHPP NHPP NHPP NHPP Year Federal 2014 $128,800 2017 $3,207,463 After 2018 $12,892,814 After 2018 $448,281 State $32,200 $801,866 $3,223,204 $112,070 Other $0 $0 $0 $0 Total $161,000 $4,009,329 $16,116,018 $560,351 Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help enhance economic development and will reduce crash frequency. Also in Dougherty County Project: 0000519 Type Work: Widening Descp:SR 133 FM N OF COLQUITT COUNTY LINE TO N OF SR 112 Lanes: Exist. 2 Prop. 4 Length: 6.49 Total Project Cost: Total Project Authorizations: Total Parcels: $ 34,263,851 $ 339,600 129 Phase PE ROW CST UTL Fund NHPP NHPP NHPP NHPP Year Federal 2014 $271,680 2017 $5,242,435 After 2018 $21,389,444 After 2018 $507,522 State $67,920 $1,310,609 $5,347,361 $126,880 Project Details: Project will provide additional capacity to improve mobility and reduce congestion. Project will help enhance economic development and will reduce crash frequency. Other $0 $0 $0 $0 Total $339,600 $6,553,044 $26,736,805 $634,402 Project: 0000520 Type Work: Widening Descp:SR 133 FM S OF SR 35/US 319 TO N OF COLQUITT COUNTY LINE Lanes: Exist. 2 Prop. 4 Length: 13.87 Total Project Cost: Total Project Authorizations: Total Parcels: $ 75,835,689 $ 161,000 166 Phase PE ROW CST UTL Fund NHPP NHPP NHPP NHPP Year 2014 2017 After 2018 After 2018 Federal $128,800 $10,214,764 $49,365,088 $959,900 State $32,200 $2,553,691 $12,341,272 $239,975 Other $0 $0 $0 $0 Total $161,000 $12,768,455 $61,706,360 $1,199,875 Project Details: widen from 2 to 4 lanes- turn lanes added at intersections- improve mobility-reduce congestion-enhance economic development- reduce crash frequency- GRIP Also in Colquitt County Project: 0001572 Type Work: Turn Lanes Descp:SR 300/US 19 MEDIAN TURN LANES FROM DOUGHERTY CO TO WARWICK Length: 13.50 Phase ROW CST Fund NHPP NHPP Year 2017 2018 Federal $284,896 $8,379,679 State $71,224 $2,094,920 Total Project Cost: Total Project Authorizations: Total Parcels: $ 10,830,719 $0 1 Project Details: Project will improve the capacity and operations of the intersection to enhance mobility. Other $0 $0 Total $356,120 $10,474,599 372 STATE TRANSPORTATION IMPROVEMENT PROGRAM Project: 0007622 Type Work: Bicycle/Ped. Facility Descp:CR 328/ISABELLA ST FM NORTH ST TO KING ST IN SYLVESTER Length: 0.44 Total Project Cost: Total Project Authorizations: Total Parcels: $ 646,116 $0 0 Phase CST Fund HPP Year 2016 Federal $311,960 State $0 Other $334,156 Total $646,116 Project: 0007914 Type Work: Streetscapes Descp:SR 112 @ 1 LOC & CS 728/KELLY STREET @ 1 LOC IN SYLVESTER Length: 0.28 Total Project Cost: Total Project Authorizations: Total Parcels: $ 676,200 $0 0 Phase CST Fund Local Year 2017 Federal $0 State $0 Other $676,200 Total $676,200 Project: 0010610 Type Work: TE-Bike/Ped Facility Descp:CS 726/FRONT STREET FROM SR 33 TO SR 112 IN SYLVESTER Length: 0.12 Phase CST Fund STP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 375,000 $0 0 Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2015 - FY 2018 Federal $300,000 State $0 Other $75,000 Project: 431120- Type Work: Replace Bridge Descp:CR 160 @ OCHLOCKONEE RIVER NE OF DOERUN Length: 0.50 Total Project Cost: Total Project Authorizations: Total Parcels: $ 831,024 $ 300,000 2 Phase PE ROW CST UTL Fund STP Local STP STP Year 2014 2016 LUMP LUMP Federal $240,000 $0 $408,000 $8,160 State $60,000 $0 $102,000 $2,040 Other $0 $10,824 $0 $0 Total $375,000 Total $300,000 $10,824 $510,000 $10,200 Project: M005169 Type Work: Resurface & Maintenance Descp:SR 133 FROM COLQUITT COUNTY LINE TO DOUGHERTY COUNTY LINE Length: 10.85 Phase CST Fund NHPP Year LUMP Total Project Cost: Total Project Authorizations: Total Parcels: $ 1,995,901 $0 0 Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2015 - FY 2018 Federal $1,596,721 State $399,180 Other $0 Total $1,995,901 373 STATE TRANSPORTATION IMPROVEMENT PROGRAM Worth Totals Summary County Summary excludes lump sum projects. Project PI# 0000475 0000519 0000520 0001572 0001572 0007622 0007914 431120- Year 2017 2017 2017 2017 2018 2016 2017 2016 Phase ROW ROW ROW ROW CST CST CST ROW Fund NHPP NHPP NHPP NHPP NHPP HPP Local Local Federal $3,111,239 $5,242,435 $306,443 $284,896 $8,379,679 $311,960 $0 $0 State $777,810 $1,310,609 $76,611 $71,224 $2,094,920 $0 $0 $0 Other $0 $0 $0 $0 $0 $334,156 $676,200 $10,824 Total $3,889,049 $6,553,044 $383,054 $356,120 $10,474,599 $646,116 $676,200 $10,824 $17,636,653 $4,331,173 $1,021,180 $22,989,007 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 374 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: All Counties STIP Totals: FY 2015 Total: FY 2016 Total: Appling STIP Totals: FY 2015 Total: FY 2017 Total: Baker STIP Totals: FY 2016 Total: Baldwin STIP Totals: FY 2015 Total: FY 2016 Total: FY 2017 Total: Banks STIP Totals: STIP Counties Summary Federal $ State $ All Counties $459,827,651 $101,752,687 $484,640,032 $97,955,178 $478,391,581 $95,502,763 $479,418,018 $95,317,238 $1,902,277,283 $390,527,866 Appling $0 $2,633,316 $2,630,634 $440,631 $2,630,634 $3,073,947 Baker $93,220 $23,305 $4,852,814 $1,213,204 $4,946,034 $1,236,509 Baldwin $0 $0 $0 Banks $314,160 $0 $78,540 $1,991,326 $497,831 $4,055,310 $1,013,827 $6,360,795 $1,590,199 Other $ Total $ $23,473,639 $19,538,550 $22,730,927 $26,830,738 $92,573,853 $585,053,978 $602,133,760 $596,625,271 $601,565,994 $2,385,379,002 $0 $303,948 $303,948 $2,633,316 $3,375,213 $6,008,528 $0 $116,525 $0 $6,066,018 $0 $6,182,542 $10,824 $10,824 $10,824 $10,824 $0 $392,700 $0 $2,489,157 $0 $5,069,137 $0 $7,950,994 375 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2015 Total: FY 2016 Total: FY 2017 Total: Barrow STIP Totals: FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Bartow STIP Totals: FY 2015 Total: FY 2016 Total: FY 2018 Total: Ben Hill STIP Totals: FY 2017 Total: FY 2018 Total: Bleckley STIP Totals: FY 2016 Total: Brantley STIP Totals: FY 2016 Total: Brooks STIP Totals: Federal $ State $ Barrow $37,050 $0 $2,402,956 $590,739 $48,000 $0 $2,488,006 $590,739 Bartow $7,853,038 $1,955,097 $24,814,304 $6,194,826 $31,983,639 $7,266,813 $42,548,367 $10,637,092 $107,199,348 $26,053,828 Ben Hill $449,951 $0 $125,680 $31,420 $7,023,642 $1,755,911 $7,599,274 $1,787,331 Bleckley $3,068,484 $767,121 $10,298,262 $2,574,565 $13,366,746 $3,341,687 Brantley $984,660 $246,165 $984,660 $246,165 Brooks $18,463,715 $4,615,929 $18,463,715 $4,615,929 Other $ $9,262 $10,000 $12,000 $31,262 $3,810,722 $8,750 $2,750,521 $0 $6,569,993 $112,488 $0 $0 $112,488 $117,399 $0 $117,399 $0 $0 $0 $0 Total $ $46,312 $3,003,696 $60,000 $3,110,008 $13,618,857 $31,017,880 $42,000,973 $53,185,459 $139,823,169 $562,439 $157,100 $8,779,553 $9,499,092 $3,953,005 $12,872,827 $16,825,832 $1,230,825 $1,230,825 $23,079,643 $23,079,643 376 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2016 Total: FY 2017 Total: FY 2018 Total: Bryan STIP Totals: FY 2016 Total: FY 2018 Total: Bulloch STIP Totals: FY 2015 Total: FY 2016 Total: FY 2018 Total: Butts STIP Totals: FY 2016 Total: FY 2017 Total: Calhoun STIP Totals: FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Camden STIP Totals: Federal $ State $ Bryan $0 $0 $12,972,780 $3,243,195 $11,292,770 $2,823,193 $24,265,550 $6,066,388 Bulloch $6,961,242 $1,740,310 $27,325,463 $6,831,366 $34,286,705 $8,571,676 Butts $800,000 $200,000 $0 $0 $58,114 $14,529 $858,114 $214,529 Calhoun $2,104,029 $526,007 $3,223,383 $805,846 $5,327,411 $1,331,853 Camden $40,000 $10,000 $4,322,892 $1,080,723 $22,130,836 $5,532,709 $21,313,897 $5,328,474 $47,807,626 $11,951,906 Other $ $1,500,000 $0 $0 $1,500,000 $0 $0 $0 $0 $112,000 $0 $112,000 $0 $0 $0 $0 $0 $0 $0 $0 Total $ $1,500,000 $16,215,975 $14,115,963 $31,831,938 $8,701,552 $34,156,829 $42,858,381 $1,000,000 $112,000 $72,643 $1,184,643 $2,630,036 $4,029,228 $6,659,264 $50,000 $5,403,616 $27,663,546 $26,642,371 $59,759,532 377 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Carroll STIP Totals: FY 2016 Total: FY 2017 Total: Charlton STIP Totals: FY 2015 Total: FY 2016 Total: FY 2018 Total: Chattooga STIP Totals: FY 2015 Total: Clinch STIP Totals: FY 2015 Total: FY 2016 Total: FY 2018 Total: Coffee STIP Totals: FY 2016 Total: FY 2017 Total: Colquitt STIP Totals: Federal $ State $ Carroll $251,972 $0 $4,484,238 $1,008,572 $4,277,605 $1,069,401 $4,946,902 $1,236,726 $13,960,718 $3,314,699 Charlton $4,519,865 $1,129,966 $5,449,812 $1,362,453 $9,969,677 $2,492,419 Chattooga $350,480 $87,620 $15,153,101 $3,788,275 $74,590,531 $18,647,633 $90,094,111 $22,523,528 Clinch $31,756,834 $7,939,209 $31,756,834 $7,939,209 Coffee $7,095,850 $1,773,963 $26,974,901 $6,743,725 $4,460,486 $1,115,122 $38,531,238 $9,632,810 Colquitt $26,759,384 $6,689,846 $9,908,321 $2,477,080 $36,667,705 $9,166,926 Other $ $62,993 $112,487 $0 $0 $175,480 $10,824 $0 $10,824 $0 $53,060 $0 $53,060 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $ $314,965 $5,605,298 $5,347,007 $6,183,628 $17,450,897 $5,660,655 $6,812,265 $12,472,920 $438,100 $18,994,436 $93,238,163 $112,670,700 $39,696,043 $39,696,043 $8,869,813 $33,718,627 $5,575,608 $48,164,048 $33,449,231 $12,385,401 $45,834,632 378 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2016 Total: FY 2017 Total: Crawford STIP Totals: FY 2015 Total: FY 2017 Total: Crisp STIP Totals: FY 2015 Total: FY 2017 Total: FY 2018 Total: Dawson STIP Totals: FY 2015 Total: FY 2016 Total: FY 2018 Total: Decatur STIP Totals: FY 2017 Total: Dodge STIP Totals: FY 2015 Total: FY 2016 Total: Dooly STIP Totals: Federal $ State $ Crawford $242,205 $60,551 $901,807 $225,452 $1,144,013 $286,003 Crisp $909,942 $227,486 $1,483,941 $370,985 $2,393,883 $598,471 Dawson $11,936,760 $697,213 $1,415,412 $353,853 $269,174 $67,293 $13,621,346 $1,118,359 Decatur $195,840 $48,960 $2,480,748 $620,187 $1,634,040 $408,510 $4,310,628 $1,077,657 Dodge $16,109,543 $4,027,386 $16,109,543 $4,027,386 Dooly $26,709,803 $6,677,451 $912,845 $228,211 $27,622,648 $6,905,662 Other $ $0 $0 $0 $0 $0 $0 $529,100 $0 $0 $529,100 $0 $0 $0 $0 $616,346 $616,346 $0 $0 $0 Total $ $302,756 $1,127,259 $1,430,016 $1,137,428 $1,854,926 $2,992,354 $13,163,073 $1,769,265 $336,467 $15,268,805 $244,800 $3,100,935 $2,042,549 $5,388,285 $20,753,274 $20,753,274 $33,387,254 $1,141,056 $34,528,310 379 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2016 Total: FY 2017 Total: Effingham STIP Totals: FY 2015 Total: Elbert STIP Totals: FY 2015 Total: Emanuel STIP Totals: FY 2016 Total: Evans STIP Totals: FY 2018 Total: Fannin STIP Totals: FY 2017 Total: FY 2018 Total: Gilmer STIP Totals: FY 2016 Total: Glascock STIP Totals: FY 2016 Total: FY 2017 Total: Gordon STIP Totals: Federal $ State $ Effingham $394,520 $98,630 $0 $0 $394,520 $98,630 Elbert $951,913 $1,349,449 $951,913 $1,349,449 Emanuel $4,781,024 $1,195,256 $4,781,024 $1,195,256 Evans $0 $0 $0 $0 Fannin $13,723,800 $99,200 $13,723,800 $99,200 Gilmer $2,701,411 $675,353 $4,319,894 $1,079,974 $7,021,305 $1,755,326 Glascock $0 $0 $0 $0 Gordon $176,653 $44,163 $30,106,323 $7,526,581 $30,282,976 $7,570,744 Other $ $0 $24,023,117 $24,023,117 $0 $0 $0 $0 $10,824 $10,824 $0 $0 $0 $0 $0 $10,824 $10,824 $0 $0 $0 Total $ $493,150 $24,023,117 $24,516,267 $2,301,362 $2,301,362 $5,976,280 $5,976,280 $10,824 $10,824 $13,823,000 $13,823,000 $3,376,764 $5,399,868 $8,776,631 $10,824 $10,824 $220,816 $37,632,904 $37,853,720 380 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2016 Total: Grady STIP Totals: FY 2016 Total: Greene STIP Totals: FY 2015 Total: FY 2017 Total: Hancock STIP Totals: FY 2015 Total: FY 2016 Total: FY 2018 Total: Haralson STIP Totals: FY 2016 Total: FY 2018 Total: Harris STIP Totals: FY 2015 Total: FY 2018 Total: Irwin STIP Totals: FY 2016 Total: FY 2017 Total: FY 2018 Total: Jackson STIP Totals: Federal $ State $ Grady $1,600,000 $400,000 $1,600,000 $400,000 Greene $0 $0 $0 $0 Hancock $96,288 $24,072 $1,725,808 $431,452 $1,822,096 $455,524 Haralson $97,920 $24,480 $3,909,123 $977,281 $31,667 $7,917 $4,038,710 $1,009,678 Harris $54,586 $13,646 $4,595,774 $1,148,943 $4,650,359 $1,162,590 Irwin $410,271 $0 $4,931,200 $1,232,800 $5,341,471 $1,232,800 Jackson $11,949,919 $2,987,480 $590,518 $147,630 $6,800,808 $1,700,202 $19,341,245 $4,835,311 Other $ $0 $0 $10,824 $10,824 $0 $0 $0 $0 $0 $0 $0 $64,946 $0 $64,946 $102,568 $0 $102,568 $0 $0 $0 $0 Total $ $2,000,000 $2,000,000 $10,824 $10,824 $120,360 $2,157,260 $2,277,620 $122,400 $4,886,403 $39,584 $5,048,388 $133,178 $5,744,717 $5,877,895 $512,839 $6,164,000 $6,676,838 $14,937,398 $738,148 $8,501,010 $24,176,557 381 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2015 Total: Jasper STIP Totals: FY 2015 Total: FY 2017 Total: Jeff Davis STIP Totals: FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Jefferson STIP Totals: FY 2015 Total: FY 2016 Total: Jenkins STIP Totals: FY 2015 Total: FY 2017 Total: Johnson STIP Totals: FY 2016 Total: Jones STIP Totals: FY 2016 Total: Lamar STIP Totals: Federal $ State $ Jasper $1,639,267 $3,829,180 $1,639,267 $3,829,180 Jeff Davis $3,169,295 $792,324 $520,172 $130,043 $3,689,467 $922,367 Jefferson $888,460 $222,115 $292,800 $73,200 $13,691,215 $3,422,804 $16,236,121 $4,059,030 $31,108,596 $7,777,149 Jenkins $1,023,253 $255,813 $655,744 $0 $1,678,997 $255,813 Johnson $230,112 $57,528 $2,643,770 $660,943 $2,873,882 $718,471 Jones $0 $0 $0 $0 Lamar $0 $0 $0 $0 Other $ $173,652 $173,652 $0 $0 $0 $0 $0 $0 $0 $0 $0 $163,936 $163,936 $0 $0 $0 $10,824 $10,824 $10,824 $10,824 Total $ $5,642,099 $5,642,099 $3,961,619 $650,214 $4,611,834 $1,110,575 $366,000 $17,114,018 $20,295,151 $38,885,744 $1,279,066 $819,680 $2,098,746 $287,640 $3,304,713 $3,592,353 $10,824 $10,824 $10,824 $10,824 382 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2015 Total: FY 2017 Total: Lanier STIP Totals: FY 2015 Total: FY 2016 Total: FY 2017 Total: Laurens STIP Totals: FY 2015 Total: Lee STIP Totals: FY 2015 Total: FY 2017 Total: Lincoln STIP Totals: FY 2015 Total: Lumpkin STIP Totals: FY 2017 Total: FY 2018 Total: Macon STIP Totals: FY 2015 Total: Madison STIP Totals: Federal $ State $ Lanier $886,176 $221,544 $2,665,799 $666,450 $3,551,975 $887,994 Laurens $3,234,438 $808,610 $0 $0 $8,059,238 $2,014,810 $11,293,676 $2,823,419 Lee $1,153,479 $288,370 $1,153,479 $288,370 Lincoln $253,574 $4,220,381 $3,694,360 $923,590 $3,947,933 $5,143,971 Lumpkin $40,553 $126,250 $40,553 $126,250 Macon $118,799 $29,700 $2,397,410 $554,853 $2,516,209 $584,552 Madison $1,160,054 $54,752,102 $1,160,054 $54,752,102 Other $ $0 $0 $0 $0 $32,473 $0 $32,473 $0 $0 $0 $0 $0 $1,132,517 $1,132,517 $0 $44,500 $44,500 $0 $0 Total $ $1,107,720 $3,332,248 $4,439,968 $4,043,048 $32,473 $10,074,048 $14,149,568 $1,441,848 $1,441,848 $4,473,954 $4,617,949 $9,091,904 $1,299,320 $1,299,320 $148,499 $2,996,763 $3,145,262 $55,912,156 $55,912,156 383 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2016 Total: Marion STIP Totals: FY 2015 Total: McDuffie STIP Totals: FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Meriwether STIP Totals: FY 2015 Total: Miller STIP Totals: FY 2016 Total: FY 2018 Total: Mitchell STIP Totals: FY 2016 Total: Monroe STIP Totals: FY 2017 Total: Montgomery STIP Totals: Federal $ State $ Marion $0 $0 $0 $0 McDuffie $29,785,156 $11,603,276 $29,785,156 $11,603,276 Meriwether $0 $375,000 $747,812 $186,953 $1,261,943 $315,486 $170,371 $42,593 $2,180,126 $920,031 Miller $673,363 $168,341 $673,363 $168,341 Mitchell $0 $0 $330,126 $82,531 $330,126 $82,531 Monroe $81,878 $20,470 $81,878 $20,470 Montgomery $25,224 $6,306 $25,224 $6,306 Other $ $21,649 $21,649 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,404 $0 $10,404 $0 $0 $0 $0 Total $ $21,649 $21,649 $41,388,433 $41,388,433 $375,000 $934,765 $1,577,428 $212,964 $3,100,157 $841,704 $841,704 $10,404 $412,657 $423,061 $102,348 $102,348 $31,530 $31,530 384 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2015 Total: FY 2016 Total: FY 2018 Total: Morgan STIP Totals: FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Murray STIP Totals: FY 2015 Total: FY 2016 Total: FY 2017 Total: FY 2018 Total: Newton STIP Totals: FY 2015 Total: FY 2018 Total: Oconee STIP Totals: FY 2015 Total: Oglethorpe STIP Totals: FY 2016 Total: FY 2017 Total: Pickens STIP Totals: Federal $ State $ Morgan $40,000 $10,000 $6,029,359 $1,507,340 $9,267,267 $2,316,817 $15,336,626 $3,834,156 Murray $244,897 $61,224 $848,134 $212,034 $10,296,583 $2,574,146 $340,744 $85,186 $11,730,357 $2,932,589 Newton $490,307 $82,624 $14,196,340 $3,509,085 $716,925 $0 $7,319,402 $1,829,851 $22,722,975 $5,421,560 Oconee $800,000 $200,000 $487,751 $121,938 $1,287,751 $321,938 Oglethorpe $2,134,754 $533,689 $2,134,754 $533,689 Pickens $935,221 $233,805 $8,713,597 $2,178,399 $9,648,819 $2,412,205 Other $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $39,953 $40,000 $432,075 $0 $512,028 $0 $0 $0 $0 $0 $0 $0 $0 Total $ $50,000 $7,536,699 $11,584,083 $19,170,782 $306,121 $1,060,168 $12,870,728 $425,930 $14,662,946 $612,884 $17,745,425 $1,149,000 $9,149,253 $28,656,562 $1,000,000 $609,689 $1,609,689 $2,668,443 $2,668,443 $1,169,027 $10,891,997 $12,061,023 385 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2015 Total: FY 2016 Total: Pierce STIP Totals: FY 2016 Total: Pike STIP Totals: FY 2015 Total: FY 2016 Total: FY 2018 Total: Pulaski STIP Totals: FY 2015 Total: Putnam STIP Totals: FY 2016 Total: Rabun STIP Totals: FY 2016 Total: Randolph STIP Totals: FY 2015 Total: FY 2016 Total: Spalding STIP Totals: Federal $ State $ Pierce $1,822,251 $0 $1,295,685 $217,027 $3,117,937 $217,027 Pike $0 $0 $0 $0 Pulaski $42,448 $10,612 $8,408,189 $2,012,057 $1,779,930 $444,983 $10,230,567 $2,467,652 Putnam $40,000 $10,000 $40,000 $10,000 Rabun $17,225,395 $4,306,349 $17,225,395 $4,306,349 Randolph $0 $0 $0 $0 Spalding $182,068 $0 $0 $0 $182,068 $0 Other $ $455,563 $149,706 $605,269 $10,824 $10,824 $0 $100,814 $0 $100,814 $0 $0 $101,714 $101,714 $10,824 $10,824 $45,517 $10,824 $56,341 Total $ $2,277,814 $1,662,418 $3,940,232 $10,824 $10,824 $53,060 $10,521,060 $2,224,913 $12,799,033 $50,000 $50,000 $21,633,458 $21,633,458 $10,824 $10,824 $227,585 $10,824 $238,409 386 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2015 Total: FY 2016 Total: Stephens STIP Totals: FY 2016 Total: FY 2017 Total: FY 2018 Total: Stewart STIP Totals: FY 2015 Total: Talbot STIP Totals: FY 2016 Total: Taylor STIP Totals: FY 2015 Total: FY 2016 Total: Telfair STIP Totals: FY 2015 Total: Terrell STIP Totals: FY 2016 Total: FY 2018 Total: Thomas STIP Totals: Federal $ State $ Stephens $152,592 $38,148 $1,215,808 $303,952 $1,368,400 $342,100 Stewart $127,345 $31,836 $1,067,262 $266,815 $485,796 $121,449 $1,680,402 $420,101 Talbot $22,296 $1,144,180 $22,296 $1,144,180 Taylor $272,800 $0 $272,800 Telfair $290,320 $0 $20,400 $2,235,773 $558,943 $2,526,092 $579,343 Terrell $38,339 $0 $38,339 $0 Thomas $215,977 $0 $10,674,060 $2,668,515 $10,890,037 $2,668,515 Other $ $0 $0 $0 $106,121 $0 $0 $106,121 $0 $0 $79,024 $79,024 $52,180 $0 $52,180 $9,585 $9,585 $84,023 $0 $84,023 Total $ $190,740 $1,519,760 $1,710,500 $265,302 $1,334,077 $607,244 $2,206,624 $1,166,476 $1,166,476 $351,824 $351,824 $362,900 $2,794,716 $3,157,615 $47,923 $47,923 $300,000 $13,342,575 $13,642,575 387 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2015 Total: FY 2016 Total: Tift STIP Totals: FY 2015 Total: FY 2016 Total: FY 2017 Total: Toombs STIP Totals: FY 2015 Total: FY 2016 Total: Towns STIP Totals: FY 2016 Total: FY 2017 Total: Troup STIP Totals: FY 2015 Total: FY 2016 Total: FY 2018 Total: Turner STIP Totals: FY 2015 Total: FY 2016 Total: Twiggs STIP Totals: Federal $ Tift $1,196,336 State $ $299,084 $4,604,475 $1,012,387 $5,800,811 $1,311,471 Toombs $0 $17,622,958 $7,482,557 $1,870,639 $4,355,198 $1,088,799 $11,837,754 $20,582,396 Towns $3,396,041 $849,010 $3,880,073 $970,018 $7,276,114 $1,819,029 Troup $14,992,580 $3,748,145 $2,395,404 $598,851 $17,387,984 $4,346,996 Turner $401,950 $0 $155,980 $0 $4,561,248 $1,140,312 $5,119,178 $1,140,312 Twiggs $2,722,707 $680,677 $0 $0 $2,722,707 $680,677 Other $ $0 $144,346 $144,346 $0 $0 $0 $0 $0 $0 $0 $10,824 $0 $10,824 $132,628 $40,090 $0 $172,718 $0 $10,824 $10,824 Total $ $1,495,420 $5,761,208 $7,256,628 $17,622,958 $9,353,196 $5,443,997 $32,420,151 $4,245,051 $4,850,091 $9,095,142 $18,751,550 $2,994,255 $21,745,805 $534,578 $196,070 $5,701,560 $6,432,207 $3,403,384 $10,824 $3,414,208 388 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2016 Total: FY 2017 Total: FY 2018 Total: Union STIP Totals: FY 2015 Total: FY 2017 Total: Upson STIP Totals: FY 2015 Total: Walker STIP Totals: FY 2015 Total: FY 2016 Total: FY 2017 Total: Walton STIP Totals: FY 2015 Total: FY 2016 Total: FY 2018 Total: Ware STIP Totals: FY 2015 Total: FY 2017 Total: Warren STIP Totals: Federal $ State $ Union $32,314,507 $9,877 $17,161,000 $0 $4,907,240 $1,226,810 $54,382,746 $1,236,687 Upson $9,887,472 $2,471,868 $7,915,418 $1,978,855 $17,802,890 $4,450,723 Walker $1,655,347 $0 $1,655,347 $0 Walton $204,677 $42,500 $1,509,748 $368,437 $1,879,200 $459,000 $3,593,625 $869,937 Ware $53,020,293 $13,255,073 $16,117,007 $4,029,252 $3,135,589 $783,897 $72,272,889 $18,068,222 Warren $1,398,400 $0 $6,612,249 $0 $8,010,649 $0 Other $ $0 $0 $0 $0 $0 $0 $0 $413,837 $413,837 $8,669 $9,000 $10,800 $28,469 $0 $520,200 $0 $520,200 $349,600 $2,637,062 $2,986,662 Total $ $32,324,383 $17,161,000 $6,134,050 $55,619,433 $12,359,340 $9,894,273 $22,253,613 $2,069,184 $2,069,184 $255,846 $1,887,185 $2,349,000 $4,492,031 $66,275,366 $20,666,459 $3,919,487 $90,861,311 $1,748,000 $9,249,311 $10,997,311 389 STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2016 Total: Federal $ State $ Washington $0 $0 Other $ $10,824 Total $ $10,824 FY 2017 Total: $3,258,565 $814,641 $0 $4,073,207 Washington STIP Totals: FY 2015 Total: $3,258,565 $814,641 Wheeler $176,653 $44,163 $10,824 $0 $4,084,031 $220,816 FY 2016 Total: $0 $0 $44,940 $44,940 FY 2018 Total: $197,055 $0 $49,264 $246,319 Wheeler STIP Totals: FY 2015 Total: $373,708 $44,163 White $15,612,321 $3,903,080 $94,204 $0 $512,075 $19,515,402 White STIP Totals: FY 2015 Total: $15,612,321 $3,903,080 Wilkes $23,064,161 $5,766,040 $0 $19,515,402 $0 $28,830,201 Wilkes STIP Totals: FY 2016 Total: $23,064,161 $5,766,040 Worth $311,960 $0 $0 $344,980 $28,830,201 $656,940 FY 2017 Total: $8,945,014 $2,236,253 $676,200 $11,857,467 FY 2018 Total: $8,379,679 $2,094,920 $0 $10,474,599 Worth STIP Totals: $17,636,653 $4,331,173 $1,021,180 $22,989,007 STIP Grand Totals: $3,034,987,341 $739,335,729 $135,683,299 $3,910,006,368 NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties. 390 Appendix A Glossary of terms 391 GLOSSARY OF TERMS ATMS Advanced Transportation Management System: a computerized system that integrates video, voice, and data management functions to collect information about the transportation infrastructure and performance analysis as well as support traffic management decisions based on real-time information. CMAQ Congestion Mitigation and Air Quality Improvement Program: directs funds primarily to areas that have failed to reach certain air quality standards. Projects allowed under this program include mass transit improvements and high-occupancy vehicle facilities. CST Construction: phase of a project that includes the actual construction of the project. DONOR STATE BONUS Donor states are states that contribute more to the Highway Trust Fund than they receive back in federalaid highway programs. These states receive a predetermined amount based on a comparison of a projection of all payments into the Highway Trust Fund and the amount received in federal-aid apportionments. Starting with the state with the lowest return, states are brought up to the level of return for states with the next higher level of return until available funds are depleted. FED Share Federal Share: portion of funding to be paid for with federal money. GARVEE Grant Anticipation Revenue Vehicle: bonds against anticipated federal funds for the purpose of accelerating the construction of the "Governor's Road Improvement Program". GA Share Georgia Share: portion of funding to be paid for with state money. GRVA GARVEE Advance: advance funding to pay for "Governor's Road Improvement Program" projects with GARVEE bond before converting to regular federal aid funding. GRVC GARVEE Converted: funding to pay back the GARVEE bond. HPP High Priority Project: list of 1,850 high priority projects specified by Congress in TEA-21. Funding for these projects totals $9.4 billion over the six years of TEA-21. Georgia will receive $283.87 million for 40 projects. 392 HIGHWAY TRUST FUND Federal account established by law to hold receipts collected by the government, earmarked for highway programs and a portion of the mass transit program; supported by the federal gasoline tax and other user taxes. INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT of 1991 (ISTEA) Transportation authorization act approved by Congress in 1991. METROPOLITAN PLANNING ORGANIZATION (MPO) Required by federal regulations in urbanized areas to develop transportation plans and programs; responsible for developing the Transportation Improvement Program (TIP). MAP-21 Moving Ahead for Progress in the 21st Century; Most recent Transportation authorization act approved by Congress in 2012. NEPA National Environmental Policy Act of 1969: requires federal government to use all practical means and measures to protect environmental values; makes environmental protection a part of the mandate of every federal agency and department. NHS National Highway System: consists primarily of the Interstates and other major routes. Includes all urban and rural principal arterials. NON-ATTAINMENT Areas that do not meet the national ambient air quality standards set by USEPA. OBLIGATION CEILING The maximum amount that a state is expected to receive from the Highway Trust Fund. OTH Share Other Share: portion of funding to be paid for with money other than federal or state funds; generally provided by local governments. PE Preliminary Engineering: phase of a project that includes the development of the concept, survey, environmental documentation and design plans. ROW Right of Way: phase of a project that includes the acquisition of any necessary property for the construction of the project. SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act- A Legacy for Users; Transportation authorization act approved by Congress in 2005. 393 STATE AID LET Projects that are funded with state money. STATE HIGHWAY SYSTEM Network of roads maintained by the state, including: road and bridge construction, maintenance, rehabilitation and restoration. There are approximately 17, 947 miles of state highways in Georgia which make up 16% of the total public road system in the state. STP Surface Transportation Program: federal funding category that provides funding for projects on any federal-aid highway, including the NHS, bridge projects on any public road, transit capital projects, and public bus terminals and facilities. TRANSPORTATION EQUITY ACT FOR THE 21ST CENTURY (TEA-21) A six-year transportation authorization act approved by Congress in 1998. TRANSPORTATION INVESTMENT ACT (TIA) A 2012 Referendum was passed by Georgia voters in the regions of Central Savannah River Area, Heart of Georgia Altamaha, and River Valley. These three regions have implemented a one-percent regional sales tax over a ten year period to fund transportation improvements. Georgia DOT is responsible for the management of the budget, schedule, execution and delivery of all projects contained in the approved investment lists. Georgia DOT is collaborating with local and state agencies to ensure timely delivery of TIA projects, with a structure that focuses on high-level project management, intergovernmental coordination, transparency and successful program delivery. TRANSPORTATION IMPROVEMENT PROGRAM (TIP) In metropolitan areas over 50,000 in population, a program of federally funded transportation projects proposed to be carried out in the first three years of adoption by the MPO. There are 16 urbanized areas in Georgia Chattanooga, Dalton, Rome, Athens, Gainesville, Augusta, Savannah, Hinesville, Brunswick, Macon, Columbus, Albany, Valdosta, Atlanta, Cartersville* and Warner Robins. The TIPs are incorporated into the STIP as adopted by the respective governments and approved by the Governor, with no changes. *The Cartersville MPO's project phases will remain in the STIP until the adoption of their initial transportation planning documents (TIP, LRTP). TYPE WORK category of project and source of funding ATM/ITS - Advanced Transportation Management/Intelligent Transportation System; work relating to computerized transportation system that supports traffic management decisions; commonly known as the NAVIGATOR System. Bicycle/Ped. Facility - generally bike/pedestrian path/lane funded through a Transportation Enhancement Activity (TEA) project. Bridges - lump sum funding identified for bridge maintenance or bridge painting. Bridge Painting - lump sum for bridge painting. Bridge Rehab - bridge rehabilitation work that will improve and/or widen an existing bridge. 394 Capital - funding identified for the purchase of transit related items. Historic Preservation - restoration or rehabilitation of historic structures that have a direct linkage to the transportation system; funded as part of a Transportation Enhancement Activities (TEA) project. Interchange - work at an interchange. Intersection Improvement - work that will improve an existing intersection. Landscaping - purchase/installation of shrubbery, plants, trees, etc. Lighting - lump sum funding for purchase/installation of lighting along a National Highway System road. Miscellaneous Improvements - identified for various projects that are not necessarily covered by a standard category. New Construction - new roadway construction on new location. Operating: funding identified for the operation of transit systems. Passing Lanes -- passing lanes added along an existing roadway. Preliminary Engineering - the design phase of a project. Ramp - construction work on a ramp at an interchange. Realignment - improvements to the geometry of a roadway. Replace Bridge - construction of a new bridge to replace an existing bridge. Rest Area - construction of rest areas along state routes (Interstates). Resurface and Maintenance - re-paving of a roadway and minor improvements. RR Xing - improvements to a road/rail crossing, such as the installation of gates, bells, lights, or improvements to the crossing itself. Safety - work that is designed to reduce accidents. Shoulder Work - improving and/or widening shoulders on a roadway. Sidewalks - installation of sidewalk. Signals - installation and/or improvement of signals. Signing - fabrication/installation of roadway signs. Special Studies - lump sum funding for planning and management studies. Turn Lanes - addition of turn lanes at intersections. Water Pollution Mitig. - lump sum funding for wetland mitigation site that were taken by roadway construction. Weigh Station - construction and/or rehabilitation of truck weigh stations. Widening - adding additional travel lanes to a roadway. 395 Appendix B Maps Georgia's Rail System Map Existing Urban and Rural Transit Programs Map State Bicycle System Map Governor's Road Improvement Program Fact Sheet and Map Georgia's Statewide Designated Freight Corridor Map State Freight Network STIP Map Georgia Department of Transportation District Map Georgia Congressional Districts Map 396 Operating Inactive Shortline Railroad Name Chattanooga NS CCKY Hedges Dalton McCaysville Mineral Bluff Blue Ridge Chatsworth White Path CSX Norfolk Southern Shortlines GDOT Owned ABR Athens Branch Chattahoochee & Gulf Chattahoochee Industrial Chattooga & Chickamauga First Coast Fulton County Georgia Central CCKY LaFayette Ellijay GNRR Toccoa Completed GDOT Rehab Projects Georgia Dept of Transportation CaterParrott Railnet Georgia Southern Summerville Calhoun Lyerly Jasper Tate Rome Canton Cartersville Gainesville HRT Lula Bowersville HRT Commerce Hartwell Goss HRT Last 10 years Prior to 2000 Current Projects Underway Acquisition Rehabilitation Potential Abandonments Georgia Northeastern Georgia Southwestern GWRC Georgia Woodlands GRWR Great Walton GITM* Golden Isle Terminal* HOG Heart of Georgia HRT Hartwell LW Louisville & Wadley Cedartown Rockmart Marietta Edna Atlanta Austell Winder Center Athens Monroe Bishop Elberton Known Trails RSOR Riceboro Southern SAN Sandersville SAPT**Savannah Port Terminal** SM St. Mary's St. Mary's West FCR GRWR SCS GWRC VR Valdosta Bremen Carrollton Union City Social Circle Covington Madison Washington SCS Squaw Creek Southern * GITM aka CISD Colonel's Island Wansley Newnan Jonesboro NS McDonough Senoia Griffin Machen Eatonton Monticello Barnett Camak Warrenton Sparta Hephzibah ** SAPT aka SSDK Savannah State Docks Augusta Rover LW SCS GS LaGrange Barnesville Wayside Milledgeville Wrens Waynesboro West Point Durand Thomaston Manchester Macon Junction City Roberta Fort Valley Warner Robins Mogul GCR Gordon SANSandersville Tennille Louisville Wadley Midville HOG Wrightsville Swainsboro Millen Dover Sylvania ORC Mahrt Columbus GSWR GSWR Cusseta GS Perry Montezuma Cochran Dublin GCR HOG Kirby Statesboro Metter Ardmore Omaha HOG Georgetown White GSWR House Cuthbert GSWR Hilton Saffold GSWR Richland Preston Americus Vienna HOG Cordele HOG Smithville Dawson GSWR Cedar Creek Rochelle GSWR Sasser Arlington GSWR Albany Sylvester GFRR Tifton Fitzgerald HOG Helena Hazlehurst Douglas GDOT Vidalia GCR Hester Claxton Pembroke Savannah Richmond Hill SAPT GITM RSOR Surrency Jesup Riceboro GFRR Camilla Colquitt GFRR GFRR Moultrie Sparks GFRR Willacoochee CPR Adel Pearson SMWR Waresboro Nahunta Waycross Everett GITM Brunswick GSWR CIRR Lynn Coolidge CPR Bainbridge Thomasville Metcalf GFRR Quitman Clyattville VR Dupont Valdosta Fargo FCRD Folkston Seals Kings Bay Kingsland SM St. Mary's N Moniac St. George Last Updated: September 13, 2012 Visit us at: WWW.DOT.GA.US Or Search for us online, enter: "GDOT RAIL" 397 State of Georgia Urban and Rural Public Transit Programs 2013 Dade Catoosa Fannin WhitfieldMurray Towns Rabun Union Walker Gilmer WhiteHabersham Chattooga Lumpkin Stephens Gordon Pickens Dawson Hall Banks Franklin Hart Floyd Bartow Cherokee Forsyth Urban Transit Program No Transit Service Rural Transit Program Regional Urban Transit Program (May not include entire county) City Programs Jackson Madison Elbert Polk Paulding Cobb Haralson Gwinnett Barrow Clarke DeKalb Oglethorpe Oconee Walton Wilkes Lincoln Douglas Fulton Rockdale Carroll Clayton Morgan Newton GreeneTaliaferro Columbia Henry McDuffie Fayette Coweta Heard Spalding Butts Jasper Putnam Warren Hancock Glascock Richmond Troup Meriwether Pike Lamar Monroe Baldwin Jones Jefferson Washington Burke Upson Harris Talbot Bibb Wilkinson Crawford Twiggs Johnson Jenkins Screven Muscogee ChattahoocheeMarion Taylor Peach Houston Bleckley Macon Emanuel Laurens Treutlen Candler Bulloch Effingham Schley Stewart Webster Sumter Quitman Terrell Lee Randolph Dooly Crisp Pulaski Wilcox Dodge Montgomery Wheeler Toombs Evans Tattnall Telfair Bryan Turner Ben Hill Jeff Davis Appling Liberty Long Chatham / Clay Calhoun Dougherty Worth Irwin Tift Coffee Early Baker Miller Mitchell Colquitt Berrien Atkinson Cook Seminole Decatur Grady Thomas Brooks Lanier Lowndes Clinch Bacon Wayne McIntosh Pierce Brantley Glynn Ware Charlton Camden Echols 398 399 6 1 7 2 3 5 4 Georgia Department of Transportation State Bicycle System LEGEND STATE BIKE ROUTES SCENIC BYWAYS STATE ROUTES COUNTY BOUNDARY GDOT DISTRICTS District Number 1 2 3 4 5 6 7 0 15 30 60 90 120 Miles The data used was provided "as is" and represents the information available and updated within GDOT at the date of issue. Every effort is made to provide accurate and reliable information, but it is still possible that errors exist or the information has changed. Georgia Department of Transportation Fact Sheet The Governor's Road Improvement Program (GRIP) Definition The Governor's Road Improvement Program, commonly referred to as GRIP, is a system of proposed economic developmental highways in Georgia. GRIP was originally adopted in 1989 by the Georgia General Assembly. Georgia law defines the following corridors as the GRIP: Appalachian Developmental Highway South Georgia Parkway/US 82 US 319 Golden Isles Parkway Fall Line Freeway SR 72 Savannah River Parkway US 19 US 1/SR 17 US 27 US 441 US 84 Sunbelt Parkway/SR 133 Power Alley/US 280 East-West Highway SR 40 SR 32 SR 125 SR 15 GRIP was initiated in 1989 and originally consisted of 12 corridors with 2,845 miles of roadway, including 113 miles of truck access routes. During the 2001 and 2005 Legislative sessions, the General Assembly added new routes, including three truck access routes. The current length of the GRIP system has grown to 3,307 miles. The total length will continue to vary as alignments, including bypasses and shifts, are determined through the engineering process. Purpose Economic development highways traditionally receive strong support in Georgia. The purpose of the GRIP system explains why : Connectivity in Rural Georgia: GRIP will connect 95% of Georgia cities with a population of 2,500 or more to the Interstate System and ensure that 98% of all areas in the state will be within 20 miles of a four-lane road. Provide opportunities for growth: Several studies have provided evidence that GRIP fosters economic development. Provide effective and efficient transportation for the growing statewide population Safer travel in rural areas: Accidents occur three times more often on 2-lane highways than on multi-lane divided highways. Visit www.dot.ga.gov for updates to this fact sheet. 400 GDOT GRIP System Fact Sheet, updated January 2014 Current GRIP Corridor Statistics GRIP CORRIDOR Appalachian Developmental Highw ay South Georgia Parkw ay/US 82 US 319 Golden Isles Parkw ay Fall Line Freew ay SR 72 Savannah River Parkw ay US 19 US 1/SR 17 TOTAL LENGTH (m iles) 60 262 72 168 215 45 156 194 331 COM PLETE OR UNDER CONSTRUCTION (m iles) 58 262 72 168 215 20 156 194 170 US 27 352 328 US 441 371 196 US 84 259 235 Sunbelt Parkw ay/SR 133 66 0 Pow er Alley/US 280 238 4 SR 32 149 13 SR 40 29 13 East-West Highw ay 169 0 SR 15 149 0 SR 125 22 0 COM PLETE OR UNDER CONSTRUCTION (pe r ce ntage ) 97% 100% 100% 100% 100% 44% 100% 100% 51% 93% 53% 91% 0% 2% 9% 45% 0% 0% 0% CORRIDOR STATUS No Activity on Final 2 Miles Complete Active Construction Complete Active Construction Active Engineering and Construction Active Construction Active Construction Active Engineering and Construction Active Engineering and Construction Active Engineering and Construction Active Engineering and Construction Active Engineering and ROW acquisition Active Engineering on 27 miles only Active Engineering on 44 miles only Active Engineering No Activity No Activity No Activity REM AINING COST TO COM PLETE (m illions) $15.7 $0.0 $0.0 $0.0 $0.0 $154.1 $0.0 $0.0 $772.2 $377.5 $799.8 $110.7 $271.4 $1,399.6 $1,238.0 $57.8 $555.9 $917.8 $170.2 Subtotals for Original 1989 GRIP Cor r idor s : Subtotals for Active & Com plete GRIP Corridors: Grand Totals for all GRIP Cor r idor s : 2485 2967 3307 2074 2091 2104 83% 70% 64% $2,230.0 $4,876.6 $6,840.7 Meeting the Challenge GDOT is striving to complete the construction of the GRIP System. A strategy is in place that recognizes the complexity of each of the three phases of project development: Engineering (including environmental studies) Right of way acquisition Construction These phases are not generally scheduled for completion in the same year, and in most cases a phase takes several years to complete. Another consideration in scheduling each phase is the availability of funds. A multiple-year funding program to accomplish the planning, design, right of way and construction of the GRIP System is based on these considerations and the past funding history for GRIP projects. Contact: Office of Program Control 404-631-1523 401 Visit www.dot.ga.gov for updates to this fact sheet. GDOT GRIP System Fact Sheet, updated January 2014 402 Georgia's Statewide Designated Freight Corridor 59 !(!(!( tu441 Legend Savannah !(75 tu27 575 985 17 85 72 285!(!(!( 20 !( !(!(!( !( l!( !( 675 20 !(!( tu27 85 75 17 520 109 Macon-LaGrange tu441 F!(all Line Freeway 74 475 !( 185 Fall LineFreeway tu1 !( 16 Statewide Freight Corridor !( Freight Rail Yards | Sea Port l HJAIA Counties *Industrial Facilities by Number of Parking Spaces 55 - 125 126 - 350 351 - 1000 JimmyDeLoach Pkwy 95 0 5 Miles 21 307 !( | Grange Rd !( !(Brampton Rd !( !( 516 16 !( Atlanta !( 285 !( !( tu27 0 75 !( 520 !( 133 tu84 tu441 | !(!(!(!(!( tu82 tu84 !( tu84 95 !( !( tu82 tu1 !( | !( 50 100 Miles !(Austell 6 75 85 !( !( 20 !( !( Fairburn!( 85 0 5 Miles !( l 75 *Source: Georgia Statewide Freight & Logistics Plan, GDOT, 2012 403 DADE 59 CATOOSA WHITFIELD MURRAY WALKER 27 FANNIN GILMER UNION LUMPKIN TOWNS RABUN 441 HABERSHAM WHITE STEPHENS State Freight Network FY 2015 - 2018 STIP CHATTOOGA FLOYD GORDON 75 BARTOW PICKENS DAWSON CHEROKEE 575 FORSYTH BANKS FRANKLIN HART Project Phases HALL 85 Project data as of 8/11/2014 441 JACKSON MADISON ELBERT 72 POLK 27 HARALSON PAULDING COBB 20 DOUGLAS FULTON GWINNETT BARROW DEKALB ROCKDALE WALTON CLARKE OCONEE OGLETHORPE 17 WILKES LINCOLN CARROLL CLAYTON NEWTON MORGAN GREENE TALIAFERRO 20 COLUMBIA 27 HEARD COWETA 85 FAYETTE HENRY SPALDING BUTTS 75 JASPER PUTNAM 441 HANCOCK WARREN MCDUFFIE GLASCOCK RICHMOND TROUP MERIWETHER 109 185 PIKE LAMAR MONROE UPSON 74 HARRIS TALBOT CRAWFORD Fall Line JONES BALDWIN Fall Line WASHINGTON JEFFERSON BIBB WILKINSON TWIGGS 1 JOHNSON BURKE JENKINS MUSCOGEE TAYLOR PEACH HOUSTON BLECKLEY EMANUEL LAURENS 16 TREUTLEN CANDLER CHATTAHOOCHEE MARION MACON SCREVEN BULLOCH EFFINGHAM SCHLEY STEWART WEBSTER SUMTER QUITMAN 27 RANDOLPH TERRELL LEE 82 DOOLY PULASKI DODGE MONTGOMERY WHEELER TOOMBS EVANS BRYAN WILCOX CRISP 75 TURNER BEN HILL TELFAIR 441 JEFF DAVIS TATTNALL 1APPLING LIBERTY LONG CHATHAM CLAY CALHOUN DOUGHERTY EARLY MILLER BAKER MITCHELL WORTH 133 COLQUITT IRWIN TIFT 82 BERRIEN COOK COFFEE ATKINSON BACON WAYNE 84 MCINTOSH 95 PIERCE GLYNN 82 BRANTLEY 84 SEMINOLE DECATUR GRADY THOMAS 84 BROOKS ! LANIER CLINCH ! LOWNDES 441 ! ECHOLS ! WARE 1 CHARLTON CAMDEN Draft STIP 2015-2018 Phases* Current Activity* Preliminary Engineering Under Construction Right of Way 2 Lanes - No Activities in 15-18 STIP Construction 4+ Lanes - No Activities in 15-18 STIP *Projects include capacity improvements, interchanges, and variable speed limit signs 0 10 20 40 Miles 60 80 Georgia Department of Transportation District Map Dade Catoosa Walker Whitfield Murray Fannin Gilmer Union Chattooga Floyd Gordon 6 Bartow Pickens Lumpkin Dawson Cherokee Forsyth Towns Rabun White Habersham Stephens Banks Franklin Hall 1 Jackson Madison Hart Elbert Polk Haralson Paulding Cobb 7 Douglas Fulton Gwinnett DeKalb Barrow Walton Clarke Oconee Oglethorpe Wilkes Lincoln Carroll Heard Coweta Clayton Rockdale Newton Morgan Greene Taliaferro Columbia McDuffie Fayette Henry Spalding Butts Jasper Putnam Hancock Warren Glascock Richmond Troup Meriwether Pike Lamar Monroe Jones Baldwin 2 Washington Jefferson Burke Harris Upson 3 Talbot Crawford Bibb Wilkinson Twiggs Johnson Jenkins Screven Muscogee Taylor Chattahoochee Marion Schley Macon Stewart Webster Sumter Quitman Peach Houston Bleckley Dooly Pulaski Dodge Crisp Wilcox Randolph Terrell Lee Turner Ben Hill Emanuel Laurens Treutlen Candler Bulloch Effingham Montgomery Wheeler Telfair Jeff Davis Toombs Appling Evans Tattnall 5 Long Bryan Liberty Chatham Clay Calhoun Dougherty Early Miller Baker Mitchell Worth 4 Colquitt Irwin Tift Berrien Cook Coffee Atkinson Bacon Wayne Pierce Ware Brantley McIntosh Glynn Seminole Decatur Grady Thomas Lanier Brooks Lowndes Clinch Charlton Camden Echols 0 15 30 60 Miles Source: Georgia Department of Transportation 405 Georgia Congressional Districts Map Dade Catoosa Walker Whitfield Murray Fannin Gilmer Union Towns Rabun Habersham White Chattooga Gordon Pickens Lumpkin Dawson 9 Stephens Floyd 14 Bartow 11 Cherokee Forsyth Hall Banks Franklin Hart Jackson Madison Elbert Polk Paulding Cobb 6 7 Gwinnett Barrow Clarke Oglethorpe Oconee Haralson Carroll Douglas DeKalb Fulton 5 4 Walton 13 Clayton Rockdale Newton Morgan Wilkes Greene Taliaferro Lincoln Columbia Heard Fayette Henry Coweta 3 Spalding Butts Jasper Putnam 10 Hancock McDuffie Warren Glascock Richmond Troup Meriwether Pike Lamar Monroe Jones Baldwin Jefferson Washington Burke Harris Upson Bibb Wilkinson Talbot Crawford Twiggs Johnson Jenkins Screven Muscogee Taylor Chattahoochee Marion Schley Macon Stewart Webster Sumter Quitman Peach Houston Bleckley Dooly Pulaski Dodge Crisp Wilcox Randolph Terrell Lee Turner Ben Hill Emanuel Laurens Treutlen 12 Candler Bulloch Effingham Montgomery Wheeler Telfair Jeff Davis Toombs Evans Tattnall Bryan Chatham Appling Liberty Long Clay Early Calhoun 2 Dougherty Baker Miller Mitchell Worth Colquitt Irwin Tift 8 Berrien Cook Coffee Atkinson Bacon Wayne Pierce 1 Ware Brantley McIntosh Glynn Seminole Decatur Grady Thomas Lanier Brooks Lowndes Clinch Charlton Camden Echols 0 15 30 60 Miles 406