STATEWIDE TRANSPORTATION PLANNING PROCESS CERTIFICATION (To be submitted with each Statewide Transportation Improvement Program)
In accordance with Title 23 CFR 450.220, .the Georgia Department of Transportation hereby certifies that its statewide transportation planning process is addressing major issues facing the State and its non-urbanized areas, and is being carried out in accordance with the following requirements:
I. 49 U.S. Section 5323(k), 23 U.S.C. 135 and 23 CFR part 450.220;
II. Title VI of the Civil Rights Act of 1964 and the Title VI assurance executed by each State under 23 U.S,C. 324 and '29 U.S.C. 794;
III. Section 1101 of the Transportation Equity ACt for the 21st Century (Pub. L. 105-178) regarding the involvement of disadvantaged business enterprises in FHWA and FTA funded project (Sec. 105 (f), Pub. L. 97-424,96 Stat. 2100,49 CFR part 23);
IV. The provisions of the Americans, With Disabilities Act of 1990 (Pub. L. 101-336,104 State 327, as amended) and the U.S. DOT implementing regulation;
V. The provision of 49 CFR part 20 regarding restrictions on influencing
certain activities; and
.
VI. (for state with non-attainment and/or maintenance areas outside metropolitan planning area boundaries) sections 174 and 176 (c) and (d) of the Clean Air Act as. amended (42 U.S.C. 7504,7506 (c) and (d).
~ I1n --
~ rv. ..~(~ \ m_-. 4
... {\.
_
~
Commls oner
.
_ _9=- L:l -eJ e.J
_
Date
Please send any comments to:
Georgia Department of Transportation Office of Planning
No.2 Capitol Square Atlanta, Georgia 30334 Attention: Robert Hughes STIP Project Manager Phone (404)657-6699 Email Robert.Hughes@dot.state.ga.us
State Transportation Improvement Program
Introduction
STIP Public Involvement Process
STIP Funds by Category
STIP Financial Plan-Lump Sum Funding
Understanding STIP Entries
Map of Georgia
Index of Projects
STIP Projects
Appendix A
Glossary
Appendix B
Transit Tables
Appendix C (Maps)
Georgia Rail Passenger Program and HSR
Commuter Rail Lines
Intercity Rail Lines
Existing Passenger Rail Service
Urban Transit Systems
Rural Transit Systems
Bike/Ped
GRIP
Metropolitan Areas
State Transportation Improvement Program
Introduction
We are pleased to present the Fiscal Year (FY) 2005-2007 State Transportation Improvement Program (STIP) for Georgia. Please note that STIP projects from the Chattanooga Metropolitan Planning Organization (MPO), which include portions of Catoosa, Dade and Walker Counties in Georgia, only show projects for fiscal years 2005 and 2006 because the Chattanooga MPO will not adopt a FY2006FY2008 TIP until later this year.
The STIP includes Highway, Bridge, Bicycle, Pedestrian, Transportation Enhancement Activities and Public Transportation (transit) projects. Project related costs, such as Preliminary Engineering ("PE"), Right of Way ("ROW"), and Construction ("CST") are given for highways, and capital and operating costs for public transit. The projects are organized in alphabetical order by county with the same information categories listed for each of them. Projects that extend into multiple counties are shown in the STIP under each county the project enters. The project related cost and mileage for multi-county projects are given for the entire project and not per county. Projects listed in the STIP were identified through the planning process in consultation with rural local officials as per GDOT's "Consultation Process with Local Officials in Non-Metropolitan Areas of the State", and are important to the state's transportation program.
Cost estimates for individual projects are based on the best available engineering estimates. These costs may change as a project progresses from preliminary engineering to the purchase of right of way to construction. If these increased costs are the result of a change in the original scope of the project, the STIP will be amended, including the necessary public involvement. If the increased costs are based on updated engineering improvements and not a change in the actual work, no amendment to the STIP is necessary.
The STIP was developed under guidelines provided by the Transportation Equity Act for the 21st Century (TEA-21), passed by Congress in 1998. TEA-21 continues the initiatives started under the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). Projects in the STIP emphasize the maintenance, safety, and improvement of existing transportation facilities and public transportation systems.
The STIP is fiscally balanced, including only those projects with funding available or having a reasonable expectation of obtaining funds. Federal funds for fiscal years 2005,2006 and 2007 are program estimates and will not be final until after the federal budget is implemented on October 1 of each year.
Census Data indicates that the population growth rate of Georgia between April 1, 2000 and July 1, 20Q3 was 6.1%. This growth rate is nearly double the U.S. average. Georgia's economy is also growing, leading to increased demands on the transportation system. The STIP process ensures that we receive maximum benefits from available funding and that Georgia's transportation system will continue to support and promote Georgia's growth and economy.
The Department of Transportation wishes to thank all of the citizens and local officials for taking the time to provide input on the development of this program.
Georgia Department of Transportation
STATE TRANSPORTATION IMPROVEMENT PROGRAM
PUBLIC INVOLVEMENT PROCESS
Background on the State Transportation Improvement Program
Federal legislation requires that each state produce a State Transportation Improvement Program (STIP). The STIP lists federally funded projects for the next three years, and is updated and approved on an annual basis.
A major component of the STIP development process is public involvement. In the fifteen metropolitan areas of the state public involvement is the responsibility of the local metropolitan planning organizations (MPOs) in developing local Transportation Improvement Programs (TIP). The Office of Planning oversees the STIP public involvement process for the six rural GDOT Districts and distributes the STIP to the Districts for use in their public meetings and meetings with local officials.
Process
The public involvement process has evolved over time but the basic components remain the same.
Public meetings
Annual public meetings are held to provide the opportunity for public review and comment. GDOT contracts with 11 Service Delivery Regions (SDR) to assist the DOT District Offices with coordinating the STIP public involvement process and conducting the public meetings. In 2004 fifteen public meetings were held on the following dates:
May 17 - Macon (2 meetings) May 18 - Milledgeville (2 meetings) May 20 - Columbus May 24 - Dublin May 27 - Cartersville June 1 - Plains (2 meetings)
June 3 - Camilla June 3 - Gay June 8- Valdosta June 15- Gainesville June 22 - Augusta June 22 - Jesup'
The Department and the SDRs invited large numbers of customers to these meetings. The Department mailed over 5,200 individual invitations to local officials and the Family of Partners, a group of stakeholders with interest in transportation. The SDRs sent additional invitations to local officials, chambers of commerce, transportation providers, and other stakeholders.
Ads were placed in local newspapers publicly announcing STIP meetings and announcements are published in Department newsletters, (On Target) and SDR publications. An informational brochure explaining the STIP process is also published and distributed at the public meetings.
Meetings with Local Officials
Every year as part of the STIP development process, the District Planning and Programming Engineers meet with representatives from each county and city in their area to discuss projects in the STIP to solicit comments and questions. During these meetings, a range of transportation issues are discussed and requests are forwarded to the appropriate DOT office for response. Local officials sign a "Certification of Cooperation with Elected Officials" documenting STIP consultation.
STIP on web
The Department also makes the FY 2005-2007 STIP available to citizens on the Department's web page. The web address for the Georgia STIP is:
http://www.dot.state.ga.usIDOT/planprog/planning/programs/stip_ 0507 lindex.shtml An email contact is also included on this site for citizen's comments.
Comments
Comments received from the public meetings and the meetings with locals are taken into consideration in the development of the STIP and any questions asked are answered or forwarded to the appropriate office. The comments and questions received from the public meetings and the meetings with the local officials ranged from general comments such as the need for more public transit routes to project specific questions, such as when is a particular project scheduled for construction. All questions were responded to in writing.
The State Transportation Improvement Program is also available in paper format for a fee by calling the Department's Map Sales at (770)986-1436:
(((((((((((((((((((((((
((((
ReconstlRehab
$2,590,212
STIP Funds by Category for
2005 - 200 7 Total Funds $7.9 Billion
(
Transit
_ $819,138
Bridges
$1,412,651
Other
$854,522
$ in Thousands
...
New Construction
$520,959
Safety
$755,482
Enhancement
$400,721
Maintenance
$614,824
Georgia Department of Transportation STIP Financial Plan
The Georgia Statewide Transportation Improvement Program (STIP) lists highway, passenger rail and transit projects. The following describes how the STIP Financial Plan (SFP) was developed for Fiscal 2005-2007. The SFP allocates transportation funding to state and local projects for a three year time period. The financial plan includes projects for which funding can reasonably be expected to be available. Only those projects or project phase (preliminary engineering, rights-of way or construction) for highway projects or (capital or operating) for transit projects may be included in the STIP.
The Fiscal 2005-2007 SFP was developed on the basis of current state and federal fund balances and projected 2004,2006, and 2007 Federal-aid and state funding for each of the three years ofthe STIP. Also the Transportation Improvement Programs (TIP) and their related funding, developed by Georgia's fifteen Metropolitan Planning Organizations (MPO), are incorporated into the STIP by reference.
The Fiscal 2005-2007 SFP for highways and transit totals $7.87 billion with a FY 2005 annual program of$2.60 billion. Funding for this three-year program includes $4.29 billion in federal funds, $2.11 billion in state funds, $1.25 billion in State Bonds, and $0.23 billion in local funds. This level of infrastructure investment supports nearly 330,834 jobs in the construction industry as well as a well-maintained transportation system that fosters a healthy economy by providing the infrastructure for efficient movement of goods and people.
The project cost estimates used in developing the STIP are based on the best available engineering estimates at the time. Final cost for the actual projects may differ, as the projects are refined through the pre-construction process. If changes due to these modifications alter the original intent, design, or scope of the project then appropriate STIP amendment procedure will be followed.
HIGHWAY PROGRAMS -funded by the continuation Title 1 ofTEA 21 (Transportation Equity Actfor the 'Zl" Century)
Interstate Maintenance (1M) - Funds used for resurfacing, restoration, and rehabilitation of the Interstate Highway System. These funds cannot be used to provide new capacity to the system, nor for construction of new facilities such as rest areas, ports of entry, etc.
National Highway System (NHS) - The system of national highways approved by Congress and considered most important to interstate travel, national defense, connectivity with other modes of transportation, and for international commerce. The system includes the current Interstate highways and other key state routes identified by the State.
Surface Transportation Program (STP)- STP funds may be used for a range ofprojects from new construction to resurfacing, and may be flexed to transit. STP funds are distributed according to federal guidelines and in compliance with State legislation.
Fifty percent of STP funds are for urban and rural areas of the state based on population. Thirty percent can be used in any area ofthe state at the direction of the State Transportation Board. Of the remaining twenty percent, ten percent is for highway safety projects and ten percent is used for
Transportation Enhancement Activity projects. Safety projects include Hazard Elimination, Railroad Crossing, and Railroad Protective Devices.
The Transportation Enhancement Program is very popular, especially with users of non-traditional transportation. The State Transportation Board established the Transportation Enhancements Advisory Panel to assist in project selection and to represent statewide interests with expertise in multi-modal facilities, historic resources, transportation aesthetics, scenic preservation and other TEA-type activities.
There are twelve categories of TEA projects.
These include" ...provisions offacilities for pedestrians and bicycles; provision ofsafety and
educational activities for pedestrians and bicyclists; acquisition ofscenic easements...or historic
sites; scenic or historic highway programs (including the provision oftourist and welcome center
facilities), landscaping and other scenic beautification; historic preservation, rehabilitation and
operation ofhistoric transportation buildings, structures, or facilities (including railroadfacilities);
preservation ofabandoned railway corridors (including the conversion and use thereoffor
pedestrian or bicycle trails); control and removal ofoutdoor advertising; archaeological planning
and research; and environmental mitigation to address water pollution due to highway runoff, or
oriefdtruacnesvpeohritcaltei.o-cnamusuesdeuwmilsd. l"ifSeoumrceo: rNtaatliiotnyal
(while, maintaining habitat connectivity);
Transportation Enhancement Clearinghouse,
and,
establishment
Legislation limits eligible recipients to public agencies. However, private groups are encouraged to participate by applying through an appropriate public agency (County and/or City). TEA program funds require a 20% match provided by the recipient.
Congestion Management/Air Quality (CMAQ) - These funds are for projects, which can be proven to reduce traffic congestion and/or improve air quality in non-attainment areas. Projects such as park and ride lots, signal coordination, and ride sharing qualify for these funds. Currently, there are thirteen counties in the non-attainment area: Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Paulding, and Rockdale.
Bridge Replacement (BR) - These funds are for the replacement or rehabilitation of substandard bridges both on and off the federal system. Bridges must have a span of20 feet and must be listed on the Federal Register with a sufficiency rating of 80 or less for rehabilitation and 50 or less for replacement.
Demonstration or High Priority (Demo, HPP) - These funds are congressionally authorized and designated for specified projects.
IHIGHWAY FUNDING SOURCESI
State Funding Sources - The $3.31billion in State highway funds are available from several sources including motor fuel taxes, special fuel taxes (diesel), State Bonds and 3% state sales tax on gasoline. Ninety-seven percent of these funds are used for construction and maintenance of highways. The remaining three percent are programmed for improvements to local roads. Revenues from these sources increase about one percent a year. State funds are part of the STIP program development, with $807 million used for federal match.
2
Federal Highway Funding Sources - Federal highway funds in the STIP are estimated based on the Department's expectations of what Congress will authorize to be spent on the program. The Department expects $3.796 billion in federal highway funds over the next three years, from the Highway Trust and Other Funds and $1.103 billion from carryover funding from the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 and from Transportation Equity Act for the 21stCentury (TEA-21). Georgia's yearly share from the Highway Trust Fund is anticipated to be about 3.50% of the estimated $32.7 billion or $1.133 billion in FY 2005. The obligation ceiling, or the minimum amount of funds that Georgia will receive, is 90.5% of that amount. Estimates are subject to change based on forthcoming yearly appropriation and obligation levels set by Congress.
Local Highway Funding Sources - During the three-year program, an estimated $101 million in local funds will be needed to match federal-aid for local highway projects and for local contributions to matching improvements on the state highway system.
IFY 2005-2007 FUNDING OF HIGHWAY PROJECTSI
The $7.34 billion highway program for FY 2005-2007 includes $3.9 billion in federal-aid, $3.31 billion in state funds and $0.116 billion in local funds. The following table summarizes program funding for FY 2005-2007:
FY 2005-2007 Highway Projects ($ Millions)
Fund Source
Federal Aid State Funds Local Funds Bond Funds Total
FY 2005 FY 2006 FY 2007
$1,446 $527 $54 $327
$2,354
$1,241 $769 $33 $496
$2,539
$1,232 $763 $29 $427
$2,451
Total FY 2005-2007
$3,919 $2,059
$116 $1,250 $7,344
Average Annual FY 2005-2007
$1,306 $686 $39 $417
$2,448
Selected Program Distribution Sidewalks Bicycle/Pedestrian Transfer to Transit HOV ITS Design
$11.5 $48.3 $68.2
$40 $58.9 $213.3
$4.3 $21.3
$5.7 $51.6 $146.5 $99.2
$6.3 $5.5 $47 $42 $115.7 $101.4
$22.1 $75.1 $120.9 $133.6 $321.1 $413.9
$7.37 $25
$40.3 $44.5 $107 $138
Local Road Assistance Federal-aid to local governments is primarily from the Surface Transportation Program and the Bridge Replacement and Rehabilitation Program. Local governments also receive federal demonstration funds for specific projects and Congestion Mitigation/Air Quality funds based on project eligibility and selection. Enhancement projects are selected statewide based on the guidance provided through the Georgia Transportation Enhancement Program.
3
Total Estimated Highway Estimated Funds and Obligation Limitation FY 2005
($ Millions)
Categor~ Groupings Federal Funds Required Matching Funds
Interstate Maintenance Bridge Placement & Rehabilitation National Highway System
Congestion Mitigation Surface Transportation
Program Misc. Categories
Total Apportionment
Total Other Funds Unobligated Balance Grand Total
$177 $89
$244
$28 $377
$218 $1,133
$9 $1,103
$2,245
$18 $18
$49
$6 $75
$44 $227
$2 $221
$449
Formula Obligation Ceiling
Other Obligation Limitation
Special Limitation
Total Apportioned Funding Availability
$903
$11
$504 $1,418
$181
$2
$101 $284
Total
$195 $107
$293
$34 $452
$262 $1,360
$11 $1,324
$2,694
$1084
$13
$605 $1,702
Total Estimated Highway Funds FY 2005-2007
($ Millions)
Category (FY) Federal Aid Match State Local Total
2005 $2,521 $ 504 $350 $54 $3,429
2006 $1,178 $236 $1,029 $33 $2,486
2007 $1,200 $240 $950 $29 $2,419
Total
$4,899 $980
$2,339 $116
$8,334
4
Transportation Equity Act for the 21st Century - Title 3 programs Transit, passenger rail, aviation, freight rail and ports join highways as significant modes in Georgia's intennodal transportation system. Non-highway modes funded through Title III or through moneys flexed from Title 1 are part of the STIP. Because of its importance to the state's transportation program, a comprehensive summary of non-highway modal programs, funded with other than TEA 21 funding and administered by the Georgia Department of Transportation is included in this document.
tI'RANSIT PROGRAMSI
The Georgia Department of Transportation in cooperation with the Federal Transit Administration (FTA) and the state's public transit agencies work together to develop service programs and facility improvements to meet the state's public transportation needs.
One of the missions of GDOT's public transit program is to preserve and enhance the state's facilities and equipment in urban and rural public transit. Public transit projects listed in the STIP are funded with Federal Transit Administration funds (under TEA 21). These projects have been identified by the MPOs through the transportation planning process and become a part of the Transportation Improvement programs (TIP) in urban areas. The Department in cooperation with rural transit operators identifies rural needs. Urban transit projects are listed for cities with transit programs in operation - Albany, Athens, Atlanta, Augusta, Columbus, Gainesville, Macon, Rome and Savannah.
Typical urban transit projects include urban capital, planning, and operating (Federal Transit Section 5307) and statewide elderly/disabled capital (Federal Transit - Section 5310) projects. GDOT is the designated recipient of FTA funds for areas under 200,000 population. The Department receives financing from the State's General Fund budget to match one half of the local share of transit projects in Albany, Athens, Gainesville, Macon and Rome. In addition, the Department coordinates with the Georgia Department of Human Resources (GDHR) on elderly and handicapped transportation projects.
Atlanta, Augusta, Savannah and Columbus have populations of over 200,000 and receive transit funds directly. The Department also provides one half the local share of matching funds for capital projects in these areas. The Department has played an important role in providing financial assistance to match projects for Cobb Community Transit (CCT), the Gwinnett County Transit, the Metropolitan Atlanta Regional Transit Authority (MARTA) and Douglas County.
Transit Programs include:
Job Access and Reverse Commute Program - FTA Section 3037 provides competitive grants to local governments, nonprofit organizations, and designated recipients of Federal transit funding to develop transportation services to connect welfare recipients and low income persons to employment and support services.
Urbanized Area Formula Program - FTA Section 5307 provides funding for capital, operating and planning assistance. Funds are distributed nationwide on a formula basis.
5
Capital Investment Program - FTA Section 5309 offers capital funding for public transportation systems on a discretionary basis. Elderly and Persons with Disabilities Formula Program - FTA Section 5310 provides funding to private non-profit agencies for capital improvements to be used in the provision of transportation service to elderly and disabled persons.
Nonurbanized Area Formula Program - FTA Section 5311 provides funding to enhance the access of people in non-urbanized areas to healthcare, shopping, education, employment, public services and recreation. Funds are available for capital, operating and administrative expenses.' Also provides capital funds for private intercity bus transportation.
tfRANSIT FUNDING SOURCESI
State Funding Sources - The State Legislature provides one-half of the required twenty percent match for federal transit funding through the General Fund. Approximately $20 million in General Funds for transit purposes are programmed in the STIP.
Federal Transit Funding Sources - The $363 million in federal transit funds is partially based on estimates of federal revenue available to Georgia through the Transit Trust Fund and from earmarked funds in the Transportation Efficiency Act for the 21st Century (TEA-21).
Local Transit Funding Sources - During the three-year program, an estimated $137 million in local funds will be needed to match federal transit funds. These funds are acquired through local sales taxes, special taxing districts, property taxes as well as the general tax digest.
FY 2005-2007 Transit Projects ($ Thousands)
Fund Source Federal Funds
FY 2005 130,334
FY 2006 FY 2007 $118,100 $114,100
Total FY Annual Average
2005-2007
$362,534
$120,844
State Funds Local Funds Total
$6,450 $48,395 $185,179
$6,914 $44,115 $169,129
$6,401 $44,416 $164,917
$19,765 $136,926 $519,225
$6,588 $45,642 $173,075
6
.'
Estimated Transit Funds FY 2005 ($ Thousands)
Category
Job Access and Reverse Commute* Urbanized Area Formula Program Capital* Urbanized Area Formula ProgramOperating* Urbanized Area Formula ProgramCapital MARTA Capital Investment Program* Capital Investment Program-MARTA Urbanized Area Formula ProgramCapital Atlanta Area- NonMARTA Nonurbanized Area Formula ProgramOperating - Atlanta Area Nonurbanized Area Formula ProgramCapital - Atlanta Area Elderly & Persons with Disabilities Program - Atlanta Area Elderly & Persons with Disabilities Program Statewide Nonurbanized Area Formula Program-
Federal Funds
$3,209
Required State Required Local
Matching Funds Matching
Funds
$0
$3,209
$7,427
$928
$928
$5,133
$0
$16,037
$36,865
$0
$9,216
$23,067 $24,865 $16,505
$1,692 $2,100
$685
$4,075 $4,116 $3,441
$375 $293 $627 $1,268 $4,273
$0 $37 $157 $317 $534 7
$375 $37 $0 $0 $534
Total $6,418 $9,283 $21,170 $46,081 $28,834 $31,081 $20,631
$750
$367
$784
$1,584
$5,341
Capital Nonurbanized Area Formula ProgramOperating Other
Total Apportionment
$6,427
$0 $130,334
*excludes MARTA
$0
$0 $6,450
$6,427
$0 $48,395
$12,854
$0 $185,179
\AVIATION PROGRAMSI
The mission of GDOT's aviation program is to preserve and enhance the State's air transportation system to meet the demands of users. The program provides financial and technical support to publicly owned, open to the public airports. The Georgia Department of Transportation is authorized to plan and support the establishment, development and maintenance of aviation and aviation facilities. The Georgia Airport Aid Program (GAAP) provides state funding assistance, appropriated by the Georgia General Assembly, for capital, maintenance, approach aid and planning projects. Development, Maintenance, Approach Aid, and Planning projects are funded at 75% state assistance or 50% state assistance for urban area airports lacking federal support. All FAA (Federal Aviation Administration) supported construction projects may be funded at 95% FAA and 2.5% state aid. Airport markings on State development projects are eligible for 100% funding. In addition, the minimum contract level of state funding assistance on all GAAP projects is $1,500. State projects (non-federal) are selected annually based on the GAAP Priority System criteria. Federally funded projects have the highest priority for matching state funds.
!RAIL PROGRAMSI
The mission of GDOT's rail program is to preserve and enhance the State's rail transportation system for the future development of rail freight and rail passenger service. Existing rail corridors identified in the "Freight Rail Plan" are acquired and rehabilitated to assure strategic rail freight access to Georgia communities. Since 1992, GDOT has acquired 497 miles of rail lines in Georgia, all of which is considered light density line track; and since 1981, GDOT has rehabilitated 764 miles of light density line track.
The passenger rail program, defined in the "Intermodal Program for Rail Passenger Service in Georgia" guides implementation of both intrastate, intercity, and commuter rail service to provide a multi-modal alternative in the State's largest travel markets. Seven commuter services and the six intercity lines have been identified to serve the Atlanta, Athens, Gainesville, Bremen, Canton, Senoia, Griffin, Macon, Albany, Savannah, Augusta, and Columbus markets.
WORT PROGRAMSI
The mission of GDOT's ports program is to preserve and enhance waterway transportation. In order to maintain a navigable channel, the Corps of Engineers dredges the Savannah River annually. The Department's role is to provide and maintain dredge material containment areas for the Corp's work
8
on the Savannah Harbor and the Atlanta Intracoastal Waterway. The Department is required to fund dike design, construction, maintenance, environment mitigation and operations. Beginning in FY06, GDOT will fund 35% of dike construction costs and no maintenance costs of disposal areas. GDOT annually requests funding from the Georgia General Assembly to cover the costs of these activities. There are no matching federal or local funds for these programs.
State Transportation Improvement Program (STIP) and Transportation Improvement Program (TIP) Amendment Process
The STIP/TIP amendment process described below details procedures that are to be used to update an existing approved STIP or TIP. A key element of the amendment process is to assure that funding balances are maintained.
TIP (Transportation Improvement Program) Administrative Changes The following actions are eligible as Administrative Changes to the TIP: Obvious minor data entry errors.
Splitting or combining projects. Minor change in expenditures for transit projects
Changes or clarifying elements of a project description (with no change in funding). This would . generally be less than 10% change in project termini. This change would not alter the original project intent.
Increase funding less than 20% for a Lump sum category
The Administrative Change process consists of a letter of notification from the MPO (Metropolitan Planning Organization) to all other involved parties: GDOT, FTA and FHWA. No public involvement is required for Administrative Changes.
TIP (Transportation Improvement Program) Minor Amendments (not controversial)* A Minor Amendment to the TIP would include adding or deleting a phase for one of the following project types:
Bike/pedestrian projects o TEA projects Transit enhancements Transportation studies using capital funds (also needs to be in SPR Work Program) Tum lane, intersection improvements and signal projects Signage, lighting, landscaping or green way projects Recreational Trails projects Minor ITS/ATMS projects
*A controversial project is defined on a case by case basis through the MPO planning process.
Consideration will be given to the amount of money involved, scope, geographic location and impacts in evaluating if a project may be controversial.
A Minor Amendment to the TIP would include making any of the following changes: Shifting projects within the TIP Move PE, ROW or Construction Funds programmed for previous year into a new TIP
9
Shifting Construction funds to add a PE or ROW phase to a project The deletion of a project at the request of the Project Sponsor Increase funding more than 20% for a Lump sum category (maintenance, safety, PE, hazard
elimination, RIR crossing etc.)
The Minor Amendment process for areas with over 500,000 population requires advertising of the amendment in a legal organ, allowing a IS-day comment period and responding to any comments received. Following public notice, approval action may be taken through the TIP approval process.
For areas with less than 500,000 in population, the amendment would 'be put on the agenda for discussion at the CAC, TCC and PC meetings and any comments received prior to or at the meetings would be responded to.
The MPO is responsible for giving notification to GDOT and FHWAlFTA of the action taken and providing assurance that the minor amendment process and the public involvement procedure have been followed.
TIP (Transportation Improvement Program) Major Amendments Major Amendments to the TIP would include the following.
Change in scope that alters the original intent ofthe project Increase or decrease in the scope of a proj ect by more than 10%. AddlDelete a phase of a project not identified in the minor amendment section: i.e.
capacity increases, regionally significant projects, major ATMS projects, controversial projects of any type.
The Major Amendment process for areas with greater than 500,000 in population requires widespread advertisement, a 30 day public comment period, and response to all comments received, either via individual or sumniary form. There is no requirement for a public hearing, however, the MPO may choose to hold a hearing. The Major Amendment project is put on the agenda for discussion and action through the TIP approval process. The Major Amendment process for areas with less than 500,000 in population requires public advertisement, a IS-day comment period, and response to all comments, either individually or in a summary form. There is no requirement for a public hearing. The Major Amendment follows the usual CAC, TCe and PC process for action.
The MPO is responsible for notification to GDOT and FHWA/FTA of action taken and assuring that the Major Amendment process and public involvement procedures have been followed.
STIP (Statewide Transportation Improvement Program) Administrative Changes The following actions are eligible as Administrative Changes to the STIP:
Project number change or Project identification number change. Splitting or combining projects. Increase in Lump Sums by less than 20%. Fund source change. Obvious minor data entry errors. Minor change in expenditures for transit projects Changes or clarifying elements of a project description (with no change in funding). This
would generally be less than 10% change in project termini. This change would not alter the original project intent.
10
. I.'
The STIP Administrative Change process consists of notification to all involved parties in the latest version ofthe Department's Construction Work Program. There is no public involvement required in such instances. If an administrative change is made at the time of submittal of a project for authorization, that form will serve as such notice.
STIP (Statewide Transportation Improvement Program) Minor Amendments A Minor Amendment to the STIP would include the following.
Shifting projects within the STIP. Move PE, ROW or Construction Funds programmed to another year of the STIP The deletion of a project at the request ofthe Project Sponsor. Increase in Lump Sums project amounts by more than 20%. Shifting Construction funds to add a PE or ROW phase to a project Addition or deletion of a phase of a project shown on the TIP Minor Amendment list Increase funding more than 20% for a Lump sum category (maintenance, safety, PE,
hazard elimination, R1R crossing etc.)
Written notification is submitted to the FHWA and FTA showing the change made and stating the source of funding assuring that the financial balance of the STIP is maintained. Cost changes made to the second and third years of the STIP will be balanced during the STIP yearly update process. Minor and Major amendments to the STIP are denoted as addendum's and consecutively numbered.
STIP (Statewide Transportation Improvement Program) Major Amendments Major amendments to the STIP would include the following:
Addition of an annual TIP. Addition or deletion of a phase of a project on the TIP Major list. Major change to scope of work of an existing project. A major change would be any
change that alters the original project intent i.e. a change in the number of through lanes,
a change in termini of more than 1 percent, or a change in location.
The Department handles the public advertisement, a IS-day comment period, and responds to all comments, either individually or in summary form. For a STIP amendment that is solely inclusion of an approved TIP or approved amended TIP, such public involvement is not necessary as this requirement was fulfilled by the MPO prior to State approval.
An amendment will be submitted to FHWA and FTA requesting approval of the addition or change made and stating the source of funding to maintain a balanced STIP. Cost changes made to the second and third year of the STIP will be balanced during the STIP yearly update process. The Department assures that the Major Amendment process and the public involvement procedure had been followed.
Notes: 1) An amendment to the STIP or TIP is not necessary for adding individual projects from Lump sum categories as long as they are consistent with the category definitions. 2) The date at which a TIP becomes effective is when the Governor or his designee approves it. 3) The date at which a STIP becomes effective is when FHWA and FTA approve it. 4) The STIP is developed on the state fiscal year which is July I-June 30. 5) For cost increases> 50% for a project with the STIP cost under $1,000,000 and for cost increases > 20% or $1 million (whichever is greater) for projects costing over $1,000,000 will be handled as
11
an minor amendment. Notification will be sent to the project sponsor and the MPO as appropriate
when a project is shifted within the STIP as a result of these amendments.
1 2 .
LUMP SUM FUNDING
A portion of the STIP funding is set aside for eight groups of projects that do not affect the capacity of the roadway. Funds are set up in lump sum categories to undertake projects that are developed after the STIP is approved. These lump sums are listed in a number of funding types for each year for the Department's convenience in managing and accounting for the funding. Funds are drawn from these lump sums during the year and individual projects are programmed. The individual projects may include work at one or several locations for letting and accounting purposes. Listed below are these eight groups and information about them. Except for groups for preliminary engineering and rights of way protective buying, the total available funds are shown as construction for easy accounting but preliminary engineering and rights-of-way may be drawn from this amount when needed in that category.
Group: maintenance
Criteria: existing system maintenance only
This group has six funding/work types: two are for bridge painting/maintenance and the other four are for roadway maintenance. Major types of work undertaken are: resurfacing, pavement rehabilitation, median work, impact attentuators, signing, fencing, pavement markings, landscaping, rest areas, walls, guardrail and shoulder work. Also included is preliminary engineering necessary to prepare plans and rights-of-way needed for work such as landslide repair, sewer hookups and erosion control.
Group: safety
Criteria: work qualifying for the High Hazard Safety Program and other safety projects
This group includes the following work types: signal installation/upgrades, guardrail installation, sign installation, railroad protection devices, railroad crossing hazard elimination, roadway hazard elimination and special safety studies and programs.
Group: preliminary engineering
Criteria: planning, management systems and consultant design services
This group has two funding/work types: planning/management .systems and consultant design services
Group: wetland mitigation
Criteria: site restoration for projects already under construction/complete and wetland banks
This group is a single item.
Group: roadway/interchange lighting
Criteria: lighting
This group is a single item.
Group: rights of way - protective buying and hardship acquisitions
Criteria: purchase of parcel(s) of rights of way (RW) for future projects that are in jeopardy of development and for hardship acquisition. Qualifying projects are those that have preliminary engineering (PE) underway or have aPE, RW or construction phase in the STIP. For counties that are not in conformance for air quality the only qualifying projects are those that have a RW phase in the STIP. This group is a single item.
Group: transportation enhancement
Criteria: projects qualifying for the Transportation Enhancement program (TEA)
TEA projects shown in the STIP will be funded on a first come first served basis. When a project is funded it is drawn down from the lump sum. When all funds are gone, no other projects can be funded until the next fiscal year, which begins on July 1.
This group is a single item.
Group: livable centers initiative (LeI)
Criteria: projects qualifying for the LCI program and selected by the Atlanta Regional Commission (ARC)
LCI implementation projects are selected on a competitive basis and lump sum funding amounts are programmed according to reasonable schedules for engineering, right of way acquisitions and construction for projects comprising the overall program. Funding for individual phases of a project may be shifted between fiscal years as necessary if such shifts do not affect the implementation schedule of other projects or exceed the overall lump sum funding amount.
This group is a single item.
.'
Group: Appalachia Local Access Road Program
Criteria: projects qualifying for the Appalachian Regional Commission (ARC) Local Access Road Program
The ARC may approve local access road projects, which serve industrial and commercial areas, residential developments, recreational areas, and educational areas. Local access road funds may be used for preliminary engineering, right-of-way and/or construction. ARC funds are available for the initial construction of local access road projects
This group is a single item.
State of Georgia County Boundaries
'-'
~
''-'
~
'-
CoIqulli
'-' '-'
'-' ''-
'-'
''''-
'-
~ ~
'-
Understanding STIP Entries
Typical project
NOTE: Projects that are located in multiple counties are shown in each of the counties the project is located. The funding information and mileage for these projects include the total project cost and mileage and not per county project cost or mileage.
This is the PI or Project Identification number used throughout the life ofthe project for tracking purpose.
List the different phases involved in a particular project. Project can consist of Preliminary Engineering, Right ofway and/or Construction.
~""
~u '.,"
iJ1EN HIL COUNTY ... '..... ~ _.'. I
'PROJECT: 432155
itJ'SSCRP'l+SR 904@t rr:
DRAFTSTATE TRANSPORTATIO IMPROVEMENT PROGRAM
TYPE WORK REPLACEBRIDGE
Phase Fund
HOUSE CREE, K 7.1:NrIN O' ,F'FITZ'.~' ERALD:RPOEW
The status ofwhen work is scheduled to begin. Right of Way to be purchased in fiscal year 2006.
State" Other
Type ofwork, replacement ofan existing bridge. See Glossary of Terms for further definitions.
Project description: State Route 90 at Little House Creek approximately 7.1 miles north ofFitzgerald. Passing lane projects may only indicate milepost numbers.
Funding type: fourth item on top line. May be Bridge, STP, NHS, etc. & refers to specific type of federal funds to be used.
Total cost of funding for each phase of work. Right of Way cost is $20,000.
Identify government participation in funding each phase ofproject. Federal government will pay $16,000 ofright-of-way cost and state government will pay $4,000.
County Appling Atkinson Bacon Baker Baldwin Banks Barrow Bartow Ben Hill Berrien Bibb Bleckley Brantley Brooks Bryan Bulloch Burke Butts Calhoun Camden Candler Carroll Catoosa Charlton Chatham Chattahoochee Chattooga Cherokee Clarke Clay Clayton Clinch Cobb Coffee Colquitt Columbia Cook Coweta Crawford Crisp Dade Dawson Decatur Deka1b Dodge Dooly Dougherty
Page 27 28 29 30 31 33 34 35 38 39 40 45 46 47 48 49 50 51 53 54 55 56 57 59 60 66 67 68 72 75 76 81 82 91 92 93 96 97 100 101 102 103 104 105 117 118 119
County Douglas Early Echols Effingham Elbert Emanuel Evans Fannin Fayette Floyd Forsyth Franklin Fulton Gilmer Glascock Glynn Gordon Grady Greene Gwinnett Habersham Hall Hancock Haralson Harris Hart Heard Henry Houston Irwin Jackson Jasper Jeff Davis Jefferson Jenkins Johnson Jones Lamar Lanier Laurens Lee Liberty Lincoln Long Lowndes Lumpkin Macon
Page 122 126 127 128 129 130 131 132 133 136 139 142 143 168 169 170 173 175 176 177 183 184 187 188 189 191 192 193 199 200 201 203 204 205 206 207 208 209 210 211 213 214 215 216 217 219 220
\
CounO' Madison Marion McDuffie Mcintosh Meriwether Miller Mitchell Monroe Montgomery Morgan Murray Muscogee Newton Oconee Oglethorpe Paulding Peach Pickens Pierce Pike Polk Pulaski Putnam Quitman Rabun Randolph Richmond. Rockdale Schley Screven Seminole Spalding Stephens Stewart Sumter Talbot Taliaferro Tattnall Taylor Telfair Terrell Thomas Tift Toombs Towns Treutlen Troup Turner
Page
221 222 223 224 225 226 227 228 229 230 231 232 235 237 238 239 241 242 243 244 245 246 247 248 249 250 251 254 257 258 259 260 263 264 265 267 268 269 270 271 272 273 274 275 276 277 278 280
County Twiggs Union Upson Walker Walton Ware Warren Washington Wayne Webster Wheeler White Whitfield Wilcox Wilkes Wilkinson Worth
Page
281 282 283 284 286 288 289 290 292 293 294 295 296 297 298 299 300
,
\
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM za/ZOO5
All
Project: 0000536 Type Work: Impact Altentuators
Descp: IMPACT ATIENUATORS INSTALLATION AT 8 LOCS
IN DIST 1, 3, 6 &7
Length: 0.00
LUMP SUM PROJECT
TIP#: LUMP
Project: 0000694 Type Work: Miscellaneous Improvement Descp: OPERATE STATE AGENCY WIDE COMMERCIAL
VEHICLE PERMIT SYSTEM Length: 0.00
TIP#:
Project: 0001439 Type Work: Miscellaneous Improvement
Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT - 2005
Length: 0.00
TIP#: AR-IIOA
Project: 0001484 Type Work: Bicycle/Ped. Facility Descp: LUMP SUM RECREATIONAL TRAILS & SCENIC
BYWY PROGRAMS FY 2005 Length: 0.00
TIP#:
Project: 0001485 Type Work: Bicycle/Ped. Facility Descp: LUMP SUM RECREATIONAL TRAILS & SCENIC
BYWY PROGRAMS FY 2006 Length: 0.00
TIP#:
Project: 0001492 Type Work: Minor Widen & Resurf
Descp: LUMP SUM NATIONAL PARK SERVICE
EMERGENCY FY 2005
Length: 0.00
TlP#:
Project: 0001494 Type Work: Resurface & Maintenance Descp: LUMP SUM NATIONAL PARK SERVICE SAFETY &
MAINTENANCE FY 2005 Length: 0.00
TlP#:
Project: 0001505 Type Work: Miscellaneous Improvement Descp: LUMP SUM FOR TRANSPORTATION
ENHANCEMENT(TEA) PROJECTS Length: 0.00
TlP#: AR 384C
Project: 0001587 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT - 2006 Length: 0.00
TlP#: 2003-H03
Project: 0001628 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT GRIP - 2005 Length: 0.00
TIP#: AR IIOC
Project: 0001629 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACTCONSTRUCTION
MANAGEMENT GRIP - 2006 Length: 0.00
TlP#:
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund CST STP
Year 2005
Phase Fund CST STP
Year 2005
Phase Fund CST Rec Trails
Year 2005
Phase Fund CST Rec Trails
Year 2006
Phase Fund CST Park
Year 2005
Phase Fund CST Park
Year 2005
Phase Fund CST STP
Year 2005
Phase Fund CST STP
Year 2006
Phase Fund CST State
Year 2005
Phase Fund CST State
Year 2006
Federal $270,000
State $30,000
Other $0
Federal $400,000
State $100,000
Other $0
Federal $8,000,000
State $2,000,000
Other $0
Federal $1,000,000
State $0
Other $250,000
Federal $1,000,000
State $250,000
Other $0
Federa/ $75,000
State $25,000
Other $0
Federal $150,000
State $50,000
Other $0
Federal $30,460,304
State $0
Other $7,615,076
Federal $10,160,000
State $2,540,000
Other $0
Federal $0
State $4,500,000
Other $0
Federal $0
State $4,500,000
Other $0
Total $300,000
Total $500,000
Total $10,000,000
Total $1,250,000
Total $1,250,000
Total $100,000
Total $200,000
Total $38,075,380
Total $12,700,000
Total $4,500,000
Total $4,500,000
Page 1 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
All
Project: 0001750 Type Work: Preliminary Engineering Descp: ENVIRONMENTAL ANAL YSIS ON FED-AID
PROJECTS BY CONSULTANT Length: 0.00
TIP#:
Project: 0001751 Type Work: Preliminary Engineering Descp: ENVIRONMENTAL ANAL YSIS ON FED-AID
PROJECTS BY CONSULTANT Length: 0.00
TJP#:
Project: 0001752 Type Work: Preliminary Engineering
Descp: ENVIRONMENTAL ANALYSIS ON GRIP PROJECTS
BY CONSULTANT
Length: 0.00
TIP#:
Project: 0001753 Type Work: Preliminary Engineering
Descp: ENVIRONMENTAL ANALYSIS ON GRIP PROJECTS
BY CONSULTANT
Length: 0.00
TIP#:
Project: 0001755 Type Work: Preliminary Engineering
Descp: ENVIRONMENTAL ANAL YSIS ON GRIP PROJECTS
BY CONSULTANT
Length: 0.00
TlP#:
Project: 0001756 Type Work: Preliminary Engineering Descp: ENVIRONMENTAL ANALYSIS ON GRIP PROJECTS
BY CONSULTANT Length: 0.00
TJP#:
Project: 0002174 Type Work: Miscellaneous Improvement Descp: DEBT SERVICE TO PAY BACK GRB & GO BONDS-
FY 2005 Length: 0.00
TlP#:
Project: 0002175 Type Work: Miscellaneous Improvement Descp: DEBT SERVICE TO PAY BACK GRB & GO BONDS-
FY 2006 Length: 0.00
TlP#:
Project: 0002176 Type Work: Miscellaneous Improvement Descp: DEBT SERVICE TO PAY BACK GRB & GO BONDS -
FY 2007 Length: 0.00
TlP#:
Project: 0002908 Type Work: ATMSIITS Descp: ATMS: ITS OPERATIONS AND SUPPORT
STATEWIDE - 2006 Length: 0.00
TIP#: AR-42SB
Project: 0002914 Type Work: ATMSIITS Descp: ATMS: HERO OPERATIONS AND SUPPORT
STATEWIDE - 2005 Length: 0.00
TlP#: AR-426A
Phase Fund
PE
STP
Phase Fund
PE
STP
Phase Fund
PE
State
Phase Fund
PE
State
Phase Fund
PE
State
Phase Fund
PE
Stale
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST NHS
Year 2005
Year 2006
Year 2007
Year 2007
Year 2005
Year 2006
Year 2005
Year 2006
Year 2007
Year 2006
Year 2005
Federal $2,000,000
State $500,000
Federal $2,000,000
State $500,000
Federal $0
State $2,500,000
Federal $0
State $2,500,000
Federal $0
State $2,500,000
Federal $0
State $2,500,000
Federal $28,000,000
State $7,000,000
Federal $28,000,000
State $7,000,000
Federal $28.000,000
State $7,000,000
Federal $4,800,000
State $1,200,000
Federal $4,800,000
State $1,200,000
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
/
Total $2,500,000
Total $2,500,000
Total $2,500,000
Total $2,500,000
Total $2,500,000
Total $2,500,000
Total $35,000,000
Total $35,000,000
Total $35,000,000
Total $6,000,000
Total $6,000,000
Page 2 of 300
\
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
All
Project: 0002915 Type Work: ATMS/ITS
Descp: ATMS: HERO OPERATIONS AND SUPPORT
STATEWIDE - 2006
Length: 0.00
TIP#: AR-426B
Project: 0002916 Type Work: ATMS/ITS
Descp: ATMS: HERO OPERATIONS AND SUPPORT
STATEWIDE - 2007
Length: 0.00
TIP#: AR-426C
Project: 0003021 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT GRIP - 2007 Length: 0.00
TIP#:
Project: 0003103 Type Work: Preliminary Engineering Descp: PE FOR PROJECT REVIEW/ COST ESTIMATING
CONSULTANT SERVICES Length: 0.00
TIP#:
Project: 0003471 Type Work: Preliminary Engineering Descp: SUBSURFACE UTILITY ENGINEERING
CONSULTANT SERVICES - PH 3 Length: 0.00
TIP#:
Project: 0003474 Type Work: Miscellaneous Improvement
Descp: OPERATE FUEL TAX EVASION & DYED FUEL
PROGRAMS - PHASE 2
Length: 0.00
TIP#:
Project: 0003475 Type Work: Miscellaneous Improvement
Descp: OPERATE FUEL TAX EVASION & DYED FUEL
PROGRAMS - PHASE 3
Length: 0.00
TIP#:
Project: 0003476 Type Work: Miscellaneous Improvement Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT FOR GRIP - PH 1 Length: 0.00
TIP#:
Project: 0003477 Type Work: Miscellaneous Improvement
Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT - PH 2
Length: 0.00
TIP#:
Project: 0003538 Type Work: Transit Projects Descp: GRTA PURCHASE OF CLEAN FUEL BUSES FOR
EXPRESS SERVICE-PH 1 Length: 0.00
TlP#: AR-375C
Project: 0003825 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT BOND - 2004 Length: 0.00
TIP#: AR-IIOF
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST State
Phase Fund
PE
STP
Phase Fund
PE
STP
Phase Fund CST OT3
Phase Fund CST OT3
Phase Fund CST State
Phase Fund CST State
Phase Fund CST Bond
Phase Fund CST Bond
Year 2006
Year 2007
Year 2007
Year 2005
Year 2006
Year 2005
Year 2007
Year 2006
Year 2006
Year 2005
Year 2005
Federal $5,200,000
State $1,300,000
Federal $6,000,000
State $1,500,000
Federal $0
State $1,000,000
Federal $1,920,000
State $480,000
Federal $5,280,000
State $1,320,000
Federal $250,000
State $250,000
Federal $250,000
State $250,000
Federal $0
State $5,000,000
Federal $0
State $5,000,000
Federal $0
State $9,470,000
Federal $0
State $4,000,000
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Total $6,500,000
Total $7,500,000
Total $1,000,000
Total $2,400,000
Total $6,600,000
Total $500,000
Total $500,000
Total $5,000,000
Total $5,000,000
Total $9,470,000
Total $4,000,000
Page 3 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
All
Project: 0003826 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT BOND - 2005 Length: 0.00
TlP#:
Phase Fund CST Bond
Project: 0003827 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT BOND - 2006 Length: 0.00
TlP#:
Phase Fund CST Bond
Project: 0003828 Type Work: Miscellaneous lrnprovernent Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT BOND - 2007 Length: 0.00
TIP#: AR-IIOC
Project: 0003890 Type Work: Landscaping Descp: WILDFLOWER PROGRAM PHASE 2 - DISTRICT 3
Phase Fund CST Bond
Phase Fund CST STP
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 0003891 Type Work: Landscaping Descp: WILDFLOWER PROGRAM PHASE 2 - DISTRICT 4
Phase Fund CST STP
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0003892 Type Work: Landscaping Descp: WILDFLOWER PROGRAM PHASE 2 - DISTRICT 5
Phase Fund CST STP
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0003895 Type Work: Preliminary Engineering
Descp: PE FOR LANDSCAPING PROJECTS INCLUDING
GATEWAYS
Length: 0.00
LUMP SUM PROJECT
TIP#:
Phase Fund
PE
STP
Project: 0004015 Type Work: Preliminary Engineering Descp: OVERSIGHT SERVICES FOR STP/Q23 & CMAQ
FUNDED TIP PROJECTS Length: 0.00
TIP#: AR 450
Project: 0004016 Type Work: Preliminary Engineering Descp: OVERSIGHT SERVICES FOR STP/Q23 & CMAQ
FUNDED TIP PROJECTS Length: 0.00
TlP#: AR 450
Project: 0004017 Type Work: Preliminary Engineering Descp: OVERSIGHT SERVICES FOR STP/Q23 & CMAQ
FUNDED TIP PROJECTS Length: 0.00
TIP#: AR 450
Project: 0004613 Type Work: Preliminary Engineering
Descp: TRAFFIC ENGINEERING STUDIES - DISTRICT SUPPORT FY 2005 Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund PE STP
Phase Fund PE STP
Phase Fund
PE
STP
Phase Fund
PE
STP
Year 2005
Year 2006
Year 2007
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year 2005
Year 2006
Year 2007
Year LUMP
Federal $0
State $4,000,000
Federal $0
State $5,742,179
Federal $0
State $5,742,179
Federal $80,000
State $20,000
Federal $80,000
State $20,000
Federal $80,000
State $20,000
Federal $400,000
State $100,000
Federal $24,000
State $6,000
Federal $24,000
State $6,000
Federal $24,000
State $6,000
Federal $900,000
State $100,000
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
I
Total $4,000,000
Total $5,742,179
Total $5,742,179
Total $100,000
Total $100,000
Total $100,000
Total $500,000
Total $30,000
Total $30,000
Total $30,000
Total $1,000,000
Page 4 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM
ZaJZQQ5
All
Project: 0004815 Type Work: ATMS/ITS
Descp: ATMS: ITS OPERATIONS AND SUPPORT
STATEWIDE 2005
Length: 0.00
TlP#: AR-425A
Project: 0004817 Type Work: ATMSIITS Descp: ATMS: ITS OPERATIONS AND SUPPORT
STATEWIDE - 2007 Length: 0.00
TlP#: AR-425C
Project: 0005388 Type Work: Miscellaneous Improvement Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT FOR FED-AID Length: 0.00
TIP#:
Project: 0005369 Type Work: Miscellaneous Improvement Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT FOR FED-AID Length: 0.00
TlP#:
Project: 0005370 Type Work: Miscellaneous Improvement Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT STATE FUNDED Length: 0.00
TIP#:
Project: 0005371 Type Work: Miscellaneous Improvement Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT STATE FUNDED Lenglh: 0.00
TlP#:
Project: 0005717 Type Work: Miscellaneous Improvement Descp: DOT PERSONNEL TRAINING FY07
Length: 0.00 TlP#:
Project: 0005728 Type Work: Miscellaneous Improvement Descp: DOT PERSONNEL TRAINING FY05
Lenglh: 0.00 TlP#:
Project: 0005729 Type Work: Miscellaneous Improvement Descp: DOT PERSONNEL TRAINING FY06
Length: 0.00 TlP#:
Project: 0005821 Type Work: Signing
Descp: SBR 15 CENTRAL RTE SBR 60 SBR70 NORTH CRESCENT BICYCLE SIGNS Length: 0.00
LUMP SUM PROJECT
TlP#: STP LUMP
Project: 0005935 Type Work: Special Studies Descp: VALUE ENGINEERING STUDIES FOR NHS
PROJECTS OVER 25M FY 07 Length: 0.00
TlP#:
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST State
Phase Fund CST State
Phase Fund PE STP
Phase Fund
PE
STP
Phase Fund PE STP
Phase Fund
PE
STP
CST STP
Phase Fund
PE
NHS
Year 2005
Year 2007
Year 2005
Year 2006
Year 2005
Year 2006
Year 2007
Year 2005
Year 2006
Year LUMP LUMP
Year 2007
Federal $3,600,000
State $900,000
Federal $4,800,000
State $1,200,000
Federal $1,600,000
State $400,000
Federal $1,600,000
State $400,000
Federal $0
State $2,000,000
Federal $0
State $2,000,000
Federal $800,000
State $200,000
Federal $800,000
State $200,000
Federal $800,000
State $200,000
Federal $31,437
$314,370
State $3,493
$34,930
Federal $800,000
State $200,000
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0 $0
Other $0
Total $4,500,000
Total $6,000,000
Total $2,000,000
Total $2,000,000
Total $2,000,000
Total $2,000,000
Total $1,000,000
Total $1,000,000
Total $1,000,000
Total $34,930 $349,300
Total $1,000,000
Page 5 of 300
STA TE TRANSPORTATION IMPROVEMENT PROGRAM 2f7I2QQ5
All
Project: 0005953 Type Work: Preliminary Engineering Descp: SOIL SURVEYS; BRIDGE FOUND.; HAZARD
STUDIES BY CONSULTANT-P3 Length: 0.00
TIP#:
Phase Fund PE STP
Project: 0006013 Type Work: Water Pollution Mitig. Oescp: 3,3BB STREAM CREDITS TO MITIGATE PI# 110465-
Phase Fund ROW STP
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 0006032 Type Work: Rights-Ol-Way Oescp: ROW ACQUISITION FOR CULTURAL RESOURCES
MITIGATION FY 06 &07 Length: 0.00
TlP#:
Phase Fund ROW STP
Project: 0006070 Type Work: Special Studies Oescp: RDC CONTRACT FOR
PLANNING/ENVIRONMENT/LOC SERVICES FY Length: 0.00
TlP#:
Phase Fund PE STP
Project: 0006120 Type Work: Miscellaneous Improvement Descp: LUMP SUM FOR TRANSPORTATION
ENHANCEMENT (TEA) PROJECTS FY 05 Length: 0.00
TlP#: AR-124A
Project: 0006121 Type Work: Miscellaneous Improvement Oescp: LUMP SUM FOR TRANSPORTATION
ENHANCEMENT (TEA) PROJECTS FY 06 Length: 0.00
TlP#: AR-124B
Project: 0006122 Type Work: Miscellaneous Improvemenl Descp: LUMP SUM FOR TRANSPORTATION
ENHANCEMENT (TEA) PROJECTS FY 07 Length: 0.00
TlP#: AR-124C
Project: 0006127 Type Work: Intersection Improvement Descp: LUMP SUM ALL SAFETY FUNDS FOR FY 2005
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Length: 0.00 TlP#: AR-118A
Project: 0006128 Type Work: Intersection Improvement Descp: LUMP SUM ALL SAFETY FUNDS FOR FY 2006
Phase Fund CST STP
Length: 0.00 TlP#: AR-118B
Project: 0006129 Type Work: Intersection Improvement Oescp: LUMP SUM ALL SAFETY FUNDS FOR FY 2007
Phase Fund CST STP
Length: 0.00
TlP#: AR-118C
Project: 0006134 Type Work: Bridges Descp: LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR
FY 2005 Length: 0.00
TlP#: AR-113A
Phase Fund CST STP
Year 2006
Year LUMP
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005
Federal $4,000,000
State $1,000,000
Other $0
Federal $112,000
State $28,000
Other $0
Federal $200,000
State $50,000
Other $0
Federal $3,204,000
Slate $801,000
Other $0
Federal $36,800,000
State $0
Other $9,200,000
Federal $36,800,000
State $0
Other $9,200,000
Federal $36,800,000
Slate $0
Other $9,200,000
Federal $47,116,800
Slale $5,235,200
Other $0
Federal $49,636,800
State $5,515,200
Other $0
Federal $54,856,800
Slate $6,095,200
Other $0
Federal $4,000,000
State $1,000,000
Other $0
Total
$5,000,000
Total
$140,000
Total
$250,000
Total $4,005,000
Total
$46,000,000
Total
$46,000,000
Total
$46,000,000 Total $52,352,000
Total
$55,152,000 Total $60,952,000
Total $5,000,000
Page 601300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2a/2QQ5
All
Project: 0006135 Type Work: Bridges
Descp: LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR
FY 2006
Length: 0.00
T1P#: AR-1138
Project: 0006136 Type Work: Bridges
Descp: LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR
FY 2007
Length: 0.00
TIP#: AR-113C
Project: 0006141 Type Work: Preliminary Engineering Descp: LUMP SUM FEDERAL PE FOR CONSULTANT
SERVICES FOR FY 2005 Length: 0.00
TIP#: AR-I09A
Project: 0006142 Type Work: Preliminary Engineering Descp: LUMP SUM FEDERAL PE FOR CONSULTANT
SERVICES FOR FY 2006 Length: 0.00
TIP#: AR-I098
Project: 0006143 Type Work: Preliminary Engineering Descp: LUMP SUM FEDERAL PE FOR CONSULTANT
SERVICES FOR FY 2007 Length: 0.00
T1P#: AR-I09C
Project: 0006146 Type Work: Resurface & Maintenance
Descp: LUMP SUM FOR INTERSTATE MAINTENANCE FOR
FY 2005
Length: 0.00
T1P#: AR-126A
Project: 0006149 Type Work: Resurface & Maintenance
Descp: LUMP SUM FOR INTERSTATE MAINTENANCE FOR
FY 2006
Length: 0.00
TIP#: AR-1268
Project: 0006150 Type Work: Resurface & Maintenance
Descp: LUMP SUM FOR INTERSTATE MAINTENANCE FOR
FY 2007
Length: 0.00
(\
TIP#: AR-126C
Project: 0006155 i Type Work: Miscellaneous Improvement
Descp: UMP SUM FY05 PROJECT ADJUSTMENTS: PR2A
AND FINAL',vOUCHERS Length: 0.00
TIP#:
Projec : 0006156 Type Work: Miscellaneous Improvement Descp: LUMP SUM FY06 PROJECT ADJUSTMENTS: PR2A
AND FINAL VOUCHERS Length: 0.00
1
Project: 10006157,1 Type Work:
TIP#: Miscellaneous Improvement
Descp: LUMP SYM FY07 PROJECT ADJUSTMENTS: PR2A
. J A~D FINAL VOUCHERS
Length: 0.00
TlP#:
Phase Fund CST STP
Phase Fund CST STP
Phase Fund
PE
STP
Phase Fund
PE
STP
Phase Fund
PE
STP
Phase Fund CST 1M
Phase Fund CST 1M
Phase Fund CST 1M
Phase PE ROW CST
Fund STP STP STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005 2005 2005 Year 2006 2006 2006 Year 2007 2007 2007
Federal $4,000,000
State $1,000,000
Federal $6,000,000
State $1,500,000
Federal $12,000,000
State $3,000,000
Federal $4,000,000
State $1,000,000
Federal $4,000,000
State $1,000,000
Federal $18,000,000
State $2,000,000
Federal $22,500,000
State $2,500,000
Federal $18,000,000
State $2,000,000
Federal $40,000,000 $28,000,000 $76,000,000
State $10,000,000
$7,000.000 $19,000,000
Federal $40,000,000 $28,000,000 $76,000,000
State $10,000,000
$7,000,000 $19,000,000
Federal $40,000,000 $28,000,000 $76,000,000
State $10,000,000
$7,000,000 $19,000,000
Other $0
Total $5,000,000
Other $0
Total $7,500,000
Other $0
Total $15,000,000
Other $0
Total $5,000,000
Other $0
Total $5.000,000
Other $0
Total $20,000,000
Other $0
Total $25,000,000
Other $0
Total $20,000,000
Other $0 $0 $0
Total $50,000,000 $35,000,000 $95,000,000
Other $0 $0 $0
Total $50,000,000 $35,000,000 $95,000,000
Other $0 $0 $0
Total $50,000,000 $35,000,000 $95,000.000
Page 7 01300
STATE TRANSPORTATION IMPROVEMENT PROGRAM WI2005
All
Project: 0006162 Type Work: Lighting
Descp: LUMP SUM INTERCHANGE/ROADWAY LIGHTING
FOR FY 2005
Length: 0.00
TlP#: AR-12IA
Project: 0006163 Type Work: Lighting
Descp: LUMP SUM INTERCHANGE/ROADWAY LIGHTING
FOR FY 2006
Length: 0.00
TlP#: AR-IZI8
Project: 0006164 Type Work: Lighting
Descp: LUMP SUM INTERCHANGEIROADWAY LIGHTING
FOR FY 2007
Length: 0.00
TIP#: AR-IZIC
Project: 0006169 Type Work: Bridges Oescp: LUMP SUM INTERSTATE BRIDGE
PAINTING/MAINTENANCE FOR FY 2005 Length: 0.00
TlP#: AR-114A
Project: 0006170 Type Work: Bridges Oescp: LUMP SUM INTERSTATE BRIDGE
PAINTING/MAINTENANCE FOR FY 2006 Length: 0.00
TlP#: AR-1148
Project: 0006171 Type Work: Bridges Oescp: LUMP SUM INTERSTATE BRIDGE
PAINTING/MAINTENANCE FOR FY 2007 Length: 0.00
TlP#: AR-114C
Project: 0006176 Type Work: Pavement Rehab Oescp: LUMP SUM MAINTENANCE FOR ANY AREA FY
2005 Length: 0.00
TlP#: AR-IZ5A
Project: 0006177 Type Work: Pavement Rehab Oescp: LUMP SUM MAINTENANCE FOR ANY AREA FY
2006 Length: 0.00
TlP#: AR-IZ58
Project: 0006178 Type Work: Pavement Rehab Descp: LUMP SUM MAINTENANCE FOR ANY AREA FY
2007 Length: 0.00
TlP#: AR-IZ5C
Project: 0006183 Type Work: Pavement Rehab Oescp: LUMP SUM MAINTENANCE FOR ANY AREA GT
200K FY 2005 Length: 0.00
TlP#:
Project: 0008184 Type Work: Pavement Rehab Descp: LUMP SUM MAINTENANCE FOR ANY AREA GT
200K FY 2006 Length: 0.00
TlP#:
Phase Fund CST NHS
Year 2005
Federal $800,000
State $200,000
Phase Fund CST NHS
Year 2006
Federal $800,000
State $200,000
Phase Fund CST NHS
Year 2007
Federal $800,000
State $200,000
Phase Fund CST 1M
Year 2005
Federal $9,000,000
State $1,000,000
Phase Fund CST 1M
Year 2006
Federal $9,000,000
State $1,000,000
Phase Fund CST 1M
Year 2007
Federal $9,000,000
State $1,000,000
Phase Fund CST STP
Year 2005
Federal
State
$49,688,000 $12,422,000
Phase Fund CST STP
Year 2006
Federal
State
$49,688,000 $12,422,000
Phase Fund CST STP
Year 2007
Federal
State
$49,688,000 $12,422,000
Phase Fund CST STP
Year 2005
Federal $6,000,000
State $1,500,000
Phase Fund CST STP
Year 2006
Federal $6,000,000
State $1,500,000
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Total
$1,000,000
Total
$1,000,000
Total
$1,000,000
Total $10,000,000
Total
$10,000,000
Total
$10,000,000
Total
$62,110,000 Total $62,110,000 Total $62,110,000 Total
$7,500,000
Total
$7,500,000
Page 8of300
STATE TRANSPORTATION IMPROVEMENT PROGRAM zaJ2QQ5
All
Project: 0006185 Type Work: Pavement Rehab
Descp: LUMP SUM MAINTENANCE FOR ANY AREA GT
200K FY 2007
Length: 0.00
TIP#:
Project: 0006190 Type Work: Pavement Rehab Descp: LUMP SUM MAINTENANCE ON NATIONAL
HIGHWAY SYSTEM FOR FY 2005 Length: 0.00
TlP#: AR-IIIA
Project: 0006191 Type Work: Resurface & Maintenance Descp: LUMP SUM MAINTENANCE ON NATIONAL
HIGHWAY SYSTEM FOR FY 2006 Length: 0.00
TlP#: AR-IIIB
Project: 0006192 Type Work: Resurface & Maintenance Descp: LUMP SUM MAINTENANCE ON NATIONAL
HIGHWAY SYSTEM FOR FY 2007 Length: 0.00
TlP#: AR-IIIC
Project: 0006197 Type Work: Railroad Crossing
Descp: LUMP SUM RAILROAD CROSSING HAZARD
ELIMINATION FY 2005
Length: 0.00
TIP#: AR-117A
Project: 0006198 Type Work: Railroad Crossing
Descp: LUMP SUM RAILROAD CROSSING HAZARD
ELIMINATION FY 2006
Length: 0.00
TIP#: AR-117B
Project: 0006199 Type Work: Railroad Crossing
Descp: LUMP SUM RAILROAD CROSSING HAZARD
ELIMINATION FY 2007
Length: 0.00
TIP#: AR-117C
Project: 0006204 Type Work: Rights-Ot-Way
Descp: LUMP SUM RIGHTS OF WAY PROTECTIVE
BUYING FOR FY 2005
Length: 0.00
TIP#: AR-119A
Project: 0006205 Type Work: Rights-Ot-Way Descp: LUMP SUM RIGHTS OF WAY PROTECTIVE
BUYING FOR FY 2006 Length: 0.00
TlP#: AR-119B
Project: 0006206 Type Work: Rights-Ot-Way Descp: LUMP SUM RIGHTS OF WAY PROTECTIVE
BUYING FOR FY 2007 Length: 0.00
TlP#: AR-119C
Project: 0006211 Type Work: Railroad Crossing
Descp: LUMP SUM RRX PROTECTION DEVICE FOR FY
2005
Length: 0.00
TIP#: AR-122A
Phase Fund CST STP
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund ROW STP
Phase Fund ROW STP
Phase Fund ROW STP
Phase Fund CST STP
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005
Federal $6,000,000
State $1,500,000
Federal $2,000,000
State $500,000
Federal $32,000,000
State $8,000,000
Federal $800,000
State $200,000
Federal $3,100,000
State $0
Federal $3,100,000
State $0
Federal $3,100,000
State $0
Federal $2,000,000
State $500,000
Federal $2,000,000
State $500,000
Federal $2,000,000
State $500,000
Federal $3,100,000
State $0
Other $0
Total $7,500,000
Other $0
Total $2,500,000
Other $0
Total $40,000,000
Other $0
Total $1,000,000
Other $0
Total $3,100,000
Other $0
Total $3,100,000
Other $0
Total $3,100,000
Other $0
Total $2,500,000
Other $0
Total $2,500,000
Other $0
Total $2,500,000
Other $0
Total $3,100,000
Page 9 at 300
STA TE TRANSPORTATION IMPROVEMENT PROGRAM za12QQ5
All
Project: 0006212 Type Work: Railroad Crossing
Descp: LUMP SUM RRX PROTECTION DEVICE FOR FY
2006
Length: 0.00
TlP#: AR-122B
Project: 0006213 Type Work: Railroad Crossing
Descp: LUMP SUM RRX PROTECTION DEVICE FOR FY
2007
Length: 0.00
TlP#: AR-122C
Project: 0006218 Type Work: Signals Descp: LUMP SUM SIGNAL INSTALL;UPGRADES &
MAINTENANCE ANY AREA FY05 Length: 0.00
TlP#: AR-123A
Project: 0006219 Type Work: Signals Descp: LUMP SUM SIGNAL INSTALL;UPGRADES &
MAINTENANCE ANY AREA FY06 Length: 0.00
TIP#: AR-123B
Project: 0006220 Type Work: Signals Descp: LUMP SUM SIGNAL INSTALL;UPGRADES &
MAINTENANCE ANY AREA FY07 Length: 0.00
TIP#: AR-123C
Project: 0006225 Type Work: Special Studies Descp: LUMP SUM TRANSPORTATION PLANNING &
MANAGEMENT SYSTEMS-2005 Length: 0.00
TIP#: AR-115A
Project: 0006226 Type Work: Special Studies Descp: LUMP SUM TRANSPORTATION PLANNING &
MANAGEMENT SYSTEMS-2006 Length: 0.00
TlP#: AR-115B
Project: 0006227 Type Work: Special Studies Descp: LUMP SUM TRANSPORTATION PLANNING &
MANAGEMENT SYSTEMS-2007 Length: 0.00
TIP#: AR-115C
Project: 0006232 Type Work: Water Pollution Mitig. Descp: LUMP SUM WETLAND MITIGATION SITE
PURCHASE/RESTORATION -2005 Length: 0.00
TlP#: AR-116A
Project: 0006233 Type Work: Water POllution Mitig. Descp: LUMP SUM WETLAND MITIGATION SITE
PURCHASE/RESTORATION -2006 Length: 0.00
TlP#: AR-116B
Project: 0006234 Type Work: Water Pollution Mitig. Descp: LUMP SUM WETLAND MITIGATION SITE
PURCHASE/RESTORATION -2007 Length: 0.00
TlP#: AR-116C
Phase Fund CST STP
Year 2006
Federal $3,100,000
State $0
Phase Fund CST STP
Year 2007
Federal $3,100,000
State $0
Phase Fund CST STP
Year 2005
Federal $12,000,000
State $3,000,000
Phase Fund CST STP
Year 2006
Federal $12,000,000
State $3,000,000
Phase Fund CST STP
Year 2007
Federal $12,000,000
State $3,000,000
Phase Fund PE STP
Year 2005
Federal $800,000
State $200,000
Phase Fund
PE
STP
Year 2006
Federal $800,000
State $200,000
Phase Fund PE STP
Year 2007
Federal $2,400,000
State $600,000
Phase Fund CST STP
Year 2005
Federal $2,000,000
State $500,000
Phase Fund CST STP
Year 2006
Federal $2,000,000
State $500,000
Phase Fund CST STP
Year 2007
Federal $8,000,000
State $2,000,000
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Total
$3,100,000
Total
$3,100,000
Total
$15,000,000
Total
$15,000,000
Total
$15,000,000
Total
$1,000,000
Total
$1,000,000 Total $3,000,000 Total
$2,500,000
Total
$2,500,000 Total
$10,000,000
Page 10of300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM za/ZQQ5
All
Project: 0006246 Type Work: New Construction
Descp: LUMP SUM APPALACHIAN DEVELOPMENT LOCAL
ACCESS ROADS
Length: 0.00
TIP#:
Project: 0006247 Type Work: New Construction
Descp: LUMP SUM APPALACHIAN DEVELOPMENT LOCAL
ACCESS ROADS
Length: 0.00
TlP#:
Project: 0006248 Type Work: New Construction
Descp: LUMP SUM APPALACHIAN DEVELOPMENT LOCAL
ACCESS ROADS
Length: 0.00
TlP#:
Project: 0006294 Type Work: Intersection Improvement
Descp: PEDESTRIAN IMPROVEMENTS @ SEVEN LOCATIONS IN DISTRICT 6 Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006366 Type Work: Miscellaneous Improvement
Descp: DEBT SERVICE FOR GARVEE TO PAY BACK
BONDS. FY 2006
Length: 0.00
TIP#:
Project: 0006367 Type Work: Miscellaneous Improvement Descp: DEBT SERVICE FOR GARVEE TO PAY BACK
BONDS FY 2007 Length: 0.00
TlP#:
Project: 0006374 Type Work: ATMS/ITS
Descp: ATMS: MAINTENANCE OF ATMS EQUIPMENT
2007
Length: 0.00
TlP#: AR-427C
Project: 0006380 Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT AND MAINTENANCE OF
EDP EQUIPMENT 2006 Length: 0.00
TlP#: AR-428B
Project: 0006381 Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT AND MAINTENANCE OF
EDP EQUIPMENT 2007 Length: 0.00
TIP#: AR428C
Project: 0006387 Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT OF OUTDATED
HARDWARE (CMS, VDS, ETC) 2005 Length: 0.00
TlP#: AR429A
Project: 0006388 Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT OF OUTDATED
HARDWARfi (CMS, VDS, ETC) 2006 Length: 0.00
TlP#: AR-429B
Phase Fund CST APD
Phase Fund CST APD
Phase Fund CST APD
Phase Fund
PE
STP
CST STP
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST Bond
Phase Fund CST NHS
Year 2005
Year 2006
Year 2007
Year Underway
LUMP
Year 2006
Year 2007
Year 2007
Year 2006
Year 2007
Year 2005
Year 2006
Federal $800,000
State $200,000
Federal $800,000
State $200,000
Federal $800,000
State $200,000
Federal $162,000
State $18,000
Federal $13,898,360
State $3,474,590
Federal $57,473,181
State $14,368,295
Federal $5,600,000
State $1,400,000
Federal $1,200,000
State $300,000
Federal $1,600,000
State $400,000
Federal $0
State $1,500,000
Federal $1,200,000
State $300,000
Other $0
Total $1,000,000
Other $0
Total $1,000,000
Other $0
Total $1,000,000
Other $0
Total $180,000
Other $0
Total $17,372,950
Other $0
Total $71,841,476
Other $0
Total $7,000,000
Other $0
Total $1,500,000
Other $0
Total $2,000,000
Other $0
Total $1,500,000
Other $0
Total $1,500,000
Page 11 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM W/2QQ5
All
Project: 0006389 Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT OF OUTDATED
HARDWARE (CMS, VDS, ETC) 2007 Length: 0.00
TIP#: AR-429C
Project: 0006403 Type Work: Signals
Descp: FULL UPGRADE AND REPAIR OF METRO TRAFFIC
SIGNALS 2005
Lanes: Exist.
Prop.
Length: 0.00
TlP#: AR-445A
Project: 0006404 Type Work: Signals
Descp: FULL UPGRADE AND REPAIR OF METRO TRAFFIC
SIGNALS 2006
Length: 0.00
TlP#: AR445B
Project: 0006405 Type Work: Signals
Descp: FULL UPGRADE AND REPAIR OF METRO TRAFFIC
SIGNALS 2007
Length: 0.00
TlP#: AR-445C
Project: 0006408 Type Work: Signals Descp: TRAFFIC SIGNAL EFFICIENCY OPITIMIZATION
PROJECT 2005 Length: 0.00
TlP#: AR-446A
Project: 0006409 Type Work: Signals Descp: TRAFFIC SIGNAL EFFICIENCY OPITIMIZATION
PROJECT- 2006 Length: 0.00
TlP#: AR-446B
Project: 0006410 Type Work: Signals
Descp: TRAFFIC SIGNAL EFFICIENCY OPITIMIZATION
PROJECT- 2007
Length: 0.00
TlP#: AR446C
Project: 0006443 Type Work: Equip. Purchase Descp: LIGHT EMITTING DIODE (LED) STATEWIDE
UPGRADE 2005 Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006444 Type Work: Equip. Purchase Descp: LIGHT EMITTING DIODE (LED) STATEWIDE
UPGRADE 2006 Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006445 Type Work: Equip. Purchase
Descp: LIGHT EMITTING DIODE (LED) STATEWIDE
UPGRADE 2007
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006461 Type Work: Intersection Improvement Descp: PEDESTRIAN UPGRADES @ 11 INTERSECTIONS
IN DISTRICT 6 Length: 0.00
LUMP SUM PROJECT
TIP#:
Phase Fund CST NHS
Year 2007
Phase Fund CST Bond
Year 2005
Phase Fund CST Bond
Year 2006
Phase Fund CST Bond
Year 2007
Phase Fund CST Bond
Year 2005
Phase Fund CST Bond
Year 2006
Phase Fund CST Bond
Year 2007
Phase Fund
PE
STP
Year LUMP
Phase Fund
PE
STP
Year LUMP
Phase Fund
PE
STP
Year LUMP
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $1,600,000
State $400,000
Federal $0
State $11,200,000
Federal $0
State $11,200,000
Federal $0
State $11,200,000
Federal $0
State $10,000,000
Federal $0
State $10,000,000
Federal $0
State $10,000,000
Federal $3,240,000
State $360,000
Federal $3,240,000
State $360,000
Federal $3,240,000
State $360,000
Federal $297,000
State $33,000
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Total
$2,000,000
Total
$11,200,000
Total
$11,200,000
Total
$11,200,000
Total
$10,000,000
Total
$10,000,000
Total
$10,000,000
Total
$3,600,000 Total
$3,600,000
Total
$3,600,000
Total
$330,000
Page 12of300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2fT/2005
All
Project: 0006463 Type Work: Intersection Improvement
Descp: PEDESTRIAN UPGRADES @ 56 INTERSECTIONS
IN DISTRICT 2
Length: 0.00
LUMP SUM PROJECT
TtP#:
Project: 0006474 Type Work: Signing Descp: OVERHEAD LED ILLUMINATED STREET NAME
SIGNS@ 20 INTERSECTIONS Length: 0.00
TIP#:
Project: 0006475 Type Work: Traffic Signal
Descp: COUNTDOWN PEDESTRIAN SIGNAL HEADS@ 20
INTERSECTIONS
Length: 0.00
TIP#:
Project: 0006478 Type Work: ATMSIITS Descp: ATMS: SURVEILLANCE AND CMS, ENHANCEMENT
EXISTING SYSTEM-2005 Length: 0.00
TIP#: AR-928A
Project: 0006479 Type Work: ATMS/ITS Descp: ATMS: SURVEILLANCE AND CMS, ENHANCEMENT
EXISTING SYSTEM-2008 Length: 0.00
TtP#: AR-928B
Project: 0006651 Type Work: Scenic Hwy Program
Descp: GEORGIA SCENIC BYWAYS PROGRAM MARKETING AND PROMOTION Length: 0.00
LUMP SUM PROJECT
TtP#:
Project: 0006664 Type Work: Signals
Descp: SIGNAL HEAD REPLACEMENT@VARLOCATIONS IN SEVERAL DISTRICTS Length: 0.00
LUMP SUM PROJECT
TtP#:
Project: 0006686 Type Work: Preliminary Engineering
Descp: CONSULTANT DESIGN OF SAFETY PROJECTS 2005 Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006687 Type Work: Preliminary Engineering Descp: SAFETY PROJECTS-CONSULTANT DESIGN 2005
LUMP SUM PROJECT
Length: 0.00 TtP#:
Project: 0006692 Type Work: Research Descp: TRANSPORTATION RESEARCH
CENTER-FREIGHTITRADEIECONOMIC GROWTH Length: 0.00
TtP#:
Project: 0006704 Type Work: Special Studies
Oescp: MULTIMODAL CORRIDOR INVESTMENT STUDIES-
2006
Length: 0.00
TtP#: AR-460B
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $1,971,900
Phase Fund CST State
Year 2005
Federal $0
Phase Fund CST State
Year 2005
Federat $0
Phase Fund
PE
NHS
CST NHS
Year 2005 2005
Federal $80,000
$800,000
Phase Fund
PE
NHS
CST NHS
Year 2007 After 2007
Federal $80,000
Phase Fund CST STP
Year LUMP
Federal $100,000
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $130,500
Phase Fund
PE
STP
Year LUMP
Federal $1,800,000
Phase Fund
PE
STP
Year LUMP
Federal $1,800,000
Phase Fund CST EARMK
Year 2005
Federal $500,000
Phase Fund PE STP
Year 2006
Federal $400,000
State $219,100
State $150,000
State $150,000
State $20,000 $200,000
State $20,000
State $0
State $14,500
State $200,000
State $200,000
State $0
State $250,000
Other $0
Other $0
Other $0
Other $0 $0
Other $0
Other $25,000
Other $0
Other $0
Other $0
Other $0
Other $100,000
Total $2,191,000
Total $150,000
Total $150,000
Total $100,000 $1,000,000
Total $100,000
Total $125,000
Total $145,000
Total $2,000,000
Total $2.000,000
Total $500,000
Total $750,000
Page 13 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
All
Project: 0006706 Type Work: Special Studies Descp: COMMUNITY CHOICES PROGRAM - FY 2006
Length: 0.00 TlP#: AR-462B
Project: 0006708 Type Work: Special Studies Descp: COUNTY COMPREHENSIVE TRANSPORTATION
PLAN ASSIST PROGRAM-2006 Lenglh: 0.00
TlP#: AR-464B
Project: 0006709 Type Work: Special Studies Descp: COUNTY COMPREHENSIVE TRANSPORTATION
PLAN ASSIST PROGRAM-2007 Length: 0.00
TlP#: AR-464C
Project: 0006711 Type Work: Special Studies
Descp: REGIONAL TRANSIT SIDEWALK ACCESSIBILITY
STUDY - FY 2006
Length: 0.00
TlP#: AR-466B
Project: 0006713 Type Work: Special Studies Descp: LIVABLE CENTERS INITIATIVE (LCI) STUDIES - FY
2006 Lenglh: 0.00
TIP#: AR-80IB
Project: 0006714 Type Wort<: Special Studies Descp: LIVABLE CENTERS INITIATIVE (LCI) STUDIES - FY
2007 Lenglh: 0.00
TlP#: AR-80IC
Project: 0006737 Type Work: Unknown Descp: METRO ATLANTA ULTRA LOW SULFUR DIESEL
(ULSD) PROJECT-FY 2006 Length: 0.00
TlP#: AR-41IB
Project: 0006739 Type Work: Transit Projects Descp: SCHOOL BUS RETROFIT PROGRAM - FY 2006
Length: 0.00
TIP#: AR-412B
Project: 0006741 Type Work: Signals Descp: METRO ATLANTA ARTERIAL SIGNAL
OPTIMIZATION PROGRAM FY 2006 Length: 0.00
TIP#: AR-413B
Project: 0006742 Type Work: Signals Descp: METRO ATLANTA ARTERIAL SIGNAL
OPTIMIZATION PROGRAM FY 2007 Length: 0.00
TlP#: AR-413C
Project: 0006743 Type Work: Unknown Descp: TRUCK STOP ELECTRIFICATION PROGRAM
Length: 0.00 TIP#: AR-414
Phase Fund
PE
STP
Year 2006
Federal $80,000
State $0
Other $20,000
Phase Fund
PE
STP
Year 2006
Federal $1,500,000
State $0
Other $375,000
Phase Fund PE STP
Year 2007
Federal $750,000
State $0
Other $187,500
Phase Fund PE STP
Year 2006
Federal $80,000
State $0
Other $20,000
Phase Fund PE SIP
Year 2006
Federal $1,000,000
State $0
Other $250,000
Phase Fund PE STP
Year 2007
Federal $1,000,000
State $0
Other $250,000
Phase Fund CST CMAQ
Year 2006 .
Federal $1,512,255
State $0
Other $378,064
Phase Fund CST CMAQ
Year 2006
Federal $800,000
State $0
Other $200,000
Phase Fund CST CMAQ
Year 2006
Federal $7,500,000
State $0
Other $1,875,000
Phase Fund CST CMAQ
Year 2007
Federal $9,116,340
State $0
Other $2,279,085
Phase Fund CST CMAQ
Year 2006
Federal $2,750,000
State $0
Other $2,865,162
Total $100,000
Total $1,875,000
Total $937,500
Total $100,000
Total $1,250,000
Total $1,250,000
Total $1,890,319
Total $1,000,000
Total $9,375,000
Total $11,395,425
Total $5,615,162
Page 14 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
All
Project: 0006754 Type Work: Special Studies
Descp: TRAVEL DEMAND MODELING ASSISTANCE FY
2006
Length: 0.00
T1P#: AR-463B
Project: 0006757 Type Work: Special Studies Descp: CONGESTION MANAGEMENT SYSTEM - FY 2006
Length: 0.00 TIP#: AR-468B
Project: 0006758 Type Work: Transit Projects Descp: ACTIVITY CENTER SHUTTLE
SYSTEMS-OPERATING ASSISTANCE-FY 2006 Length: 0.00
TIP#: AR-650D
Project: 0006759 Type Work: Transit Projects Descp: ACTIVITY CENTER SHUTTLE
SYSTEMS-OPERATING ASSISTANCE-FY 2007 Length: 0.00
TIP#: AR-650E
Project: 0006763 Type Work: Transit Projects Descp: GRTA REGIONAL EXPRESS BUS SERVICE &
OPERATIONS - FY 2007 Length: 0.00
T1P#: AR-65IA
Project: 0006768 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS-TDM EMPLOYER
SERVICES & INCENTIVES - 2006 Length: 0.00
T1P#: AR-720B
Project: 0006769 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS-TDM EMPLOYER
SERVICES & INCENTIVES - 2007 Length: 0.00
T1P#: AR-720C
Project: 0006774 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS-TDM ADVERTISING &
PUBLIC RELATIONS - 2006 Length: 0.00
T1P#: AR-730B
Project: 0006775 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS-TOM ADVERTISING &
PUBLIC RELATIONS - 2007 Length: 0.00
TIP#: AR-730C
Project: 0006779 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS-TOM REGIONAL
RIDESHARING - FY 2007 - 2009 Length: 0.00
T1P#: AR-740A
Project: 0006782 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS MEASUREMENT &
NEEDS ASSESSMENT - 2006 Length: 0.00
TIP#: AR-750B
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Year 2006
Year 2006
Year 2006
Year 2007
Year 2007
Year 2006
Year 2007
Year 2006
Year 2007
Year 2007
Year 2006
Federal $150,000
State $0
Other $37,500
Federal $160,000
State $0
Other $40,000
Federal $1,500,000
State $0
Other $375,000
Federal $2,000,000
State $0
Other $500,000
Federal $1,225,289
State $0
Other $306,322
Federal $7,120,000
State $0
Other $1,780,000
Federal $7,520,000
State $0
Other $1,880,000
Federal $2,400,000
State $0
Other $600,000
Federal $2,400,000
State $0
Other $600,000
Federal $5,100,000
State $0
Other $0
Federal $800,000
State $0
Other $200,000
Total $187,500
Total $200,000
Total $1,875,000
Total $2,500,000
Total $1,531,611
Total $8,900,000
Total $9,400,000
Total $3,000,000
Total $3,000,000
Total $5,100,000
Total $1,000,000
Page 15 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
All
Project: 0006783 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS MEASUREMENT &
NEEDS ASSESSMENT 2007 Length: 0.00
TfP#: AR-750C
Phase Fund CST CMAO
Project: 0006788 Type Work: Bicycle/Ped. Facility Descp: WALK TO SCHOOL INITIATIVE FY 2005
Phase Fund CST STP
Length: 0.00 TIP#: AR-BPOO7A
Project: 0006938 Type Work: Intersection Improvement
Descp: LUMP SUM OPERATIONS FOR ANY AREA FY
2005
Length: 0.00
TIP#:
Phase Fund CST STP
Project: 0006939 Type Work: Intersection Improvement
Descp: LUMP SUM OPERATIONS FOR ANY AREA FY
2006
Length: 0.00
TIP#:
Phase Fund CST STP
Project: 0006940 Type Work: Intersection Improvement
Descp: LUMP SUM OPERATIONS FOR ANY AREA FY
2007
Length: 0.00
TIP#:
Phase Fund CST STP
Project: 0006946 Type Work: Vegetation Removal
Descp: ENHANCED RECOVERY AREA VEGETATION REMOVAL IN DISTRICT 3 Length: 0.00
LUMP SUM PROJECT
TfP#:
Phase Fund PE STP CST STP
Project: 0006947 Type Work: Vegetation Removal
Descp: ENHANCED RECOVERY AREA VEGETATION REMOVAL IN DISTRICT 6 Length: 0.00
LUMP SUM PROJECT
TfP#:
Phase Fund
PE
STP
CST STP
Project: 0006948 Type Work: Preliminary Engineering
Descp: STATEWIDE BRIDGE INSPECTION FOR 2005 PE
ONLY
Length: 0.00
TfP#:
Phase Fund
PE
Bridge
Project: 0006949 Type Work: Preliminary Engineering Descp: STATEWIDE BRIDGE INSPECTION FOR 2006 PE
ONLY Length: 0.00
TfP#:
Phase Fund PE Bridge
Project: 0006950 Type Work: Preliminary Engineering Descp: STATEWIDE BRiDGE INSPECTION FOR 2007 - PE
ONLY Length: 0.00
TfP#:
Phase Fund
PE
Bridge
Project: 0006958 Type Work: Miscellaneous Improvement Descp: SECTION 163 DUI INCENTIVE FUNDS
Phase Fund PE 008
Length: 0.00 TfP#:
Year 2007
Year 2006
Year 2005
Year 2006
Year 2007
Year LUMP LUMP
Year LUMP LUMP
Year LUMP
Year 2006
Year 2007
Year 2005
Federal $880,000
State $0
Federal $200,000
State $0
Federal $4,000,000
State $1,000,000
Federal $4,000,000
State $1,000,000
Federal $4,000,000
State $1,000,000
Federal $18,000
$522,000
State $2,000
$58,000
Federal $18,000
$405,000
State $2,000
$45,000
Federal $4,000,000
State $1,000,000
Federal $4,000,000
State $1,000,000
Federal $4,000,000
State $1,000,000
Federal $1,411,840
State $0
Other $220,000
Other $50,000
Other $0
Other $0
Other $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $0
Other $0
Total
$1,100,000
Total
$250,000
Total
$5,000,000
Total $5,000,000
Total
$5,000,000
Total
$20,000
$580,000
Total
$20,000
$450,000
Total
$5,000,000 Total $5,000,000
Total
$5,000,000
Total
$1,411,840
Page 16of300
...t'','
..........t.0::''''''''' .'
t,
.'t!
t.
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
All
Project: 0007235 Type Work: Miscellaneous Improvement Descp: LUMP SUM FOR ARC Q23 (NO NEW PROJECTS)
Length: 0.00 TIP#:
Project: 771106- Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT AND MAINTENANCE OF
EDP EQUIPMENT PH 5 Length: 0.00
TIP#: AR-428A
Project: 771292- Type Work: ATMS/ITS
Descp: ATMS: MAINTENANCE OF ATMS EQUIPMENT
2006
Length: 0.00
TlP#: AR-427B
Project: 771295- Type Work: ATMS/ITS
Descp: ATMS: MAINTENANCE OF ATMS EQUIPMENT-
2005
Length: 0,00
TlP#: AR-427A
Project: 821055- Type Work: Bridge Rehab
Descp: OFF SYSTEM PILE ENCASEMENT PROJECT TO
REPAIR 4 BRIDGES
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 860110- Type Work: Rail Projects
Descp: TRANSPORTATION ALTERNATE STUDY-ATLANTA
TO CHATTANOOGA
Length: 0.00
TlP#: AR-267
Project: 870170- Type Work: Preliminary Engineering
Descp: TRAINING FOR TEA PROJECTS 3 YEAR
CONTRACT - PHASE 2
Length: 0,00
TlP#:
Project: MOOOO01 Type Work: Miscellaneous Improvement
Descp: CROSS DRAIN PIPE REPLACEMENTS IN DIST #3 @VARIOUS LOCATIONS Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: MOOO182 Type Work: Miscellaneous Improvement Descp: FORCE ACCOUNT MAINTENANCE ACTVITIES FOR
FY 2005 Length: 0.00
TlP#:
Project: MOOO183 Type Work: Miscellaneous Improvement Descp: FORCE ACCOUNT MAINTENANCE ACTVITIES FOR
FY 2006 Length: 0.00
TlP#:
Project: MOO0889 Type Work: Miscellaneous Improvement
Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN
DISTRICT 3
Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund CST STP
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST STP
Phase Fund
PE
HPP
Phase Fund PE STP
Phase Fund PE STP ROW STP CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund ROW STP CST STP
Year 2007
Year 2005
Year 2006
Year 2005
Year LUMP
Year 2005
Year 2005
Year Underway Underway
LUMP Year 2005
Year 2006
Year Underway
LUMP
Federal $2,567,200
Federal $1,200,000
Federal $4,800,000
Federal $4,800,000
Federal $40,000
Federal $5,800,000
Federal $75,000
Federal $84,800
Federal $12,000,000
Federal $12,000,000
Federal $394,400
State $0
State $300,000
State $1,200,000
State $1,200,000
State $10,000
State $1,450,000
State $0
State $21,200 State $3,000,000
State $3,000,000
State $98,600
Other $641,800
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Total $3,209,000
Total $1.500,000
Total $6,000,000
Total $6,000,000
Total $50.000
Total $7,250,000
Total $75,000
Total $106,000 Total $15,000,000
Total $15,000,000
Total $493,000
Page 17 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 20/2005
All
Project: MOO1854 Type Work: Bridges
oesco: PILE ENCASEMENT AT SEVERAL LOCATIONS IN DI5T 6
Length: 0.00
LUMPSUM PROJECT
TIP#;
Project: MOD1911 Type Work: Preliminary Engineering Descp: LICENSE AND SUPPORT AGREEMENT HMMS
LUMP SUM PROJECT
Length: 0.00 TlP1I:
Project: MOO2132 Type Work: Miscellaneous Improvement
Descp: FORCE ACCOUNT MAINTENANCE ACTVITIES FOR
FY 2007
Length: 0.00
TlP#:
Project: MOO2243 Type Work; Bridges oescp: PROPOSED PILE REHABILITATION AT SEV LOCS
IN 015T 3 Length: 0.00
LUMP SUM PROJECT
TlP#: Lump
Project: MOO2245 Type Work: Bridges De:;cp: PROPOSED PILE REHABILITATION AT SEVERAL
LOCS IN DISTRICT 4 Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: MOO2377 Type Work: Bridge Painting De:;cp. 1-20AT SEVERAL LOCS IN DIST 2 PROPOSED
BRIDGE PAINTING Length: 0.00
LUMPSUM PROJECT
TIP#: NHS LUMP S
PrOject: MOO2378 Type Work: Bridge Painting Descp: PROPOSED BRIDGE PAINTING AT SEVERAL
LOCATIONS IN DISTRICT 2 Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: MOO2384 Type Work: Bridge Painting
D8scp: PROPOSED BRIDGE PAINTING@ SEVERAL LOCATIONS IN DISTRICT 6 Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: MOO2424 Type Work: Bridges Descp: PROPOSED PILE REHABILITATION AT SEVERAL
LOeS IN DISTRICT 5 Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: MOO2486 Type Work: Bridges
Descp: PROPOSED BRIDGE REHABILITATlON@ SEVERAL LOCATIONS IN DIST 1 Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: MOO2557 Type Work: Bridges
Descp: PROPOSED BRIDGE REHABILITATION @ SEVERAL LOCATIONS IN DIST 6 Length: 0.00
LUMP SUM PROJECT
TlP#: lump
Phase Fund
CST STP
Phase Fund PE STP
Phase Fund CST STP
Phase Fund
PE STP CST STP
Phase Fund PE STP CST STP
Phase Fund CST 1M
Phase Fund CST STP
Phase Fund CST STP
Phase Fund PE STP CST STP
Phase Fund PE STP CST STP
Phase Fund PE STP CST STP
Year LUMP
Vear
LUMP
Vear
2007
Vear
Underway LUMP
Vear
Underway LUMP
Vear
LUMP
Year LUMP
Year LUMP
Year Underway
LUMP
Year LUMP LUMP
Vear
LUMP LUMP
Federal $1451,600
Federal $120,000
Federal $12,000,000
Federal $1,040,000
Federal $960,000
Federal $106,900
Federal $276,800
Federal $141,680
Federal $1,200,000
Federal $139,200 $780,000
Federal $148,800 $876,000
State
$37,400
State $30,000
State $3,000,000
State $260,000
State $240,000
State $12,100
State $69,200
State $35,420
State $300,000
State $34,800 $195,000
State $37,200 $219.000
Other $0
Total '187,000
Other $0
Total $150,000
Other $0
Total $15,000,000
Other $0
Total $1,300,000
Other $0
Total $1,200,000
Other $0
Total $121,000
Other $0
Total $346,000
Other $0
Total $177,100
Other $0
Total $1,500,000
Other $0 $0
Total $174,000 $975,000
Other $0 $0
Total $186,000 $1,095,000
Paoe 18 of 300
...\iw
-................
---
,.,..
------
'-
~ ~
STA TE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
All
Project: MOO2558 Type Work: Bridges Descp: PROPOSED BRIDGe R[HAOlLITATION@SEV
LOCATIONS IN DISTRICT 6 Length' 0.00
LUMP SUM PROJECT
TIP#:
Project: 1000672 Type Work: Transit Projects
Descp: FY 2005 SECTION 5311 CAPITAL FOR DOT
DISTRICT 2
Length' 0.00
TlP#:
Project: 1000673 Type Work: Transil Projects
rv Descp: 2005 SECTION 5311 OPERATING FOR DOT
DISTRICT 2
Length: 0.00
TIPit-:
Project: TOO0681 Type Work: TransitProjects
Dcscp: FY 2005 SECtiON 5310 CAPITAL FOR DHR
DISTRICT 1
Length' 0.00
TlP#:
Project: lOO0682 Type Work: Transit Projects Dcscp: FY 2005 SECTION 5310 CAPITAL FOR DHR
DISTRICT 2 Length: 0.00
TlP#:
Project: lOO0683 Type Work: Transit Projects Dcscp: FY 2005 SE:;CTION 5310 CAPITAL FOR DHR
DISTRICT 4 Length: 0.00
TlP#:
Project: TOO0684 Type Worle: Transit Projects
Dcscp: FY 2005 SECTION 5310 CAPITAL FOR DHR
DISTRICTS
Length.' 0.00
TlP#:
Project: TOO0685 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR DHR
DISTRICT 6
Lel1gth: 0.00
TIP#:
Project: TOOO686 Type Work: Transit Projects
Descp: F'"Y 2005 SECTION 5310 CAPITAL FOR DHR
DISTRICT 7
Length: 0,00
TlP#:
Project: TOOO687 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310, CAPITAL FOR DHR
DISTRICT 8
Length: 0.00
TJP#:
Project: TOO0688 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR DHR
DISTRICT 9
Length' 0.00
TlP#:
Phase Fund PE STP CST STP
Yea,
LUMP LUMP
Phase Fund CST Transit
Yea,
2005
Federal $80,000
$488,000
State $20,000 $122,000
Federal $369,200
State $46,650
Phase Fund
CST Transit
Year
2005
Federal $929,069
State $0
Phase Fund
CST Transit
Yea,
2005
Federal $164,742
State $41,185
Phase Fund CST Transit
Yea'
2005
Federal $118,980
State $29,745
Phase Fund CST Transit
Year
2005
Federal $121,268
State $30,317
Phase Fund CST Transit
Year
2005
Federal $84,658
State $21,165
Phase Fund CST Trenslt
Year 2005
Federal $57,201
State
$14,300
Phase Fund CST Transit
Year 2005
Federal $50,337
State $12,584
Phase Fund CST Transit
Year 2005
Federal $82,371
State $20,593
Phase Fund CST Transit
Yea'
2005
Federal $84,659
State $21,165
Other
$0 $0
Other $48.650
Other $929,069
Other
$0
Other
$0
Other
$0
Other $0
Other
$0
Other
$0
Other
$0
Other
$0
Total
$100,000 $610,000
Total
$466,500
Total $1,858,137
Total $205,927
Total $148,725
Total $151,585
Total $105,823
Total $71,501
Total $62,921
Total $102,964
Total $105,824
Page 19 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
All
Project: 1000889 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR DHR
DISTRICT 10
Length: 0.00
TIP#:
Project: 1000890 TypeWork: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR DHR
DISTRICT 11
Len(Jth: 0.00
TlP#:
Project: tOO0691 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR DHR
DISTRICT 12
Length: 0.00
TIP#:
Project: 1000701 Type Work: Transit Projects
Descp: FY 2005 SECTION 5311 CAPITAL FOR DOT
DISTRICT 1
LMgth: 0,00
TlP#:
Project TOO0702 Type Work: Transit Projects
Descp: FY 2005 SECTION 5311 OPERATING FOR DOT
DISTRICT 1
Length: 0.00
TlP#:
Project: TOO0703 Type Work: Transit Projects
De:scp: FY 2005 SECTION 5311 CAPITAL FOR DOT
DISTRICT 3
Length: 0.00
TlP#: AR-HE-S311
Project: TOO0704 Type Work: Transit Prolects
Descp: rv 2005 SECTION 5311 OPERATING FOR DOT
DISTRICT 3
LMgth: 0.00
TlPII: AR-HE-S311
Project: TOO0705 Type Work: Transit Projects Descp: FY 2005 SECTION 5311 CAPITAL FOR DOT
DISTRICT 4 Lfmgth: 0.00
TIP#:
Project: TOO0708 Type Work: Transit Projects
Descp: FY 2005 SECTION 5311 OPERATING FOR DOT
DISTRICT 4
Length: 0.00
TlP#:
Project: TOO0707 Type Work: Transit Projects
Ducp: FY 2005 SECTION 5311 CAPITAL FOR DOT
DISTRICT 5
Length: 0.00
TlP#:
Project: TOO0708 Type Work: Transit Projects
Descp: FY 2005 SECTION 5311 OPERATING FOR DOT
DISTRICT 5
Length: 0.00
TlP#:
Phase Fund CST Transit
Year
2005
Federal $89,235
State $22,309
Other $0
Phase Fund CST Transit
Year
2005
Federal $29.745
State
$7,436
Other $0
Phase Fund
CST Transit
Year 2005
Federal $384,398
State
$96,089
Other $0
Phase Fund
CST Transit
VH'
2005
Federal $216,800
State
$27,100
Other $27,100
Phase Fund CST Transit
Year 2005
Federal $557,193
State $0
Other $557,193
Phase Fund CST Transit
Year
2005
Federal $163,200
State $20,400
Other $20,400
Phase Fund CST Transit
Year
2005
Federal $202,352
Stafe
$U
Of her $202,532
Phase Fund CST Transit
Year
2005
Federal $802,400
Stafe $100,300
Other $100,300
Phase Fund CST Transit
VH'
2005
Federal $1,560,818
State $0
Other $1,560,818
Phase Fund CST Transit
VH'
2005
Federal $315,200
State $39,400
Other $39,400
Phase Fund CST Transit
VH'
2005
Federal $547,411
State $0
Other $547,411
Total $111,544
Total $37,161
Total $460.497
Total $271,000
Total $1,114,386
Total $204,000
r...,
$404,884
ToUI 51,003,000
Total $3,121,835
Total $394,000
Total $1,094,822
Page 20 of 300
.......t','','''',
t/
..t,::
.....'..t".',''''i''
t:
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005
All
Project: TOO0709 Type Work: Transit Projects
Descp: FY 2005 SECTION 5311 CAPITAL FOR DOT
DISTRICTS
Length: 0.00
TlP#: AR-CH-5311
Project: TOO0710 Type Work: Transit Projects
Descp: FY 2005 SECTION 5311 OPERATING FOR DOT
DISTRICT 6
Length: 0.00
TIP#: AR-CH-5311
Project: TOO0711 Type Work: Transit Projects Descp: FY 2005 SECTION 5311 DISCRETIONARY CAPITAL
Length: 0.00 TIP#:
Project: TOO0712 Type Work: Transit Projects
Descp: FY 2005 SECTION 5311 DISCRETIONARY
OPERATING
Length: 0,00
TlP#:
Project: TOO0713 Type Work: Transit Projects Descp: FY 2005 INTERCITY BUS PROGRAM
Length: 0.00 TlP#:
Project: TOO0961 Type Work: Transit Projects
Descp: FY 200S SECTION 5311 CAPITAL FOR DOT
DISTRICT 1
Length: 0.00
TlP#:
Project: TOO0962 Type Work: Transit Projects
Descp: FY 200S SECTION 5311 OPERATING FOR DOT
DISTRICT 1
Length: 0.00
TlP#:
Project: TOO0963 Type Work: Transit Projects
Descp: FY 200S SECTION 5311 CAPITAL FOR DOT
DISTRICT 2
Length: 0.00
T1P#:
Project: TOO0964 Type Work: Transit Projects
Descp: FY 200S SECTION 5311 OPERATING FOR DOT
DISTRICT 2
Length: 0,00
T1P#:
Project: TOO0965 Type Work: Transit Projects
Descp: FY 200S SECTION 5311 CAPITAL FOR DOT
DISTRICT 3
Length: 0.00
T1P#: AR-HE-5311
Project: TOO0966 Type Work: Transit Projects
Descp: FY 200S SECTION 5311 OPERATING FOR DOT
DISTRICT 3
Length: 0,00
TIP#: AR-HE-53 I I
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 200S
Phase Fund CST Transit
Year 200S
Phase Fund CST Transit
Year 200S
Phase Fund CST Transit
Year 200S
Phase Fund CST Transit
Year 200S
Phase Fund CST Transit
Year 200S
Federal $S07,7S0
State $75,970
Other $75,970
Federal $1,S24,723
State $0
Other $1,S24,723
Federal $240,000
State $30,000
Other $30,000
Federal $300,000
State $0
Other $300,000
Federal $1,254,183
State $15S,773
Other $15S,773
Federal $441,SOO
State $55,200
Other $55,200
Federal $S08,S10
State $0
Other $S08,S10
Federal $7S4,400
State $95,550
Other $95,550
Federal $974,015
State $0
Other $974,015
Federal $41,SOO
State $5,200
Other $5,200
Federal $212,618
State $0
Other $212,S18
Total $759,700
Total $3,249,445
Total $300,000
Total $SOO,OOO
Total $1,5S7,729
Total $552,000
Total $1,217,220
Total $955,500
Total $1,948,030
Total $52,000
Total $425,23S
Page 21 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2Q/2QQ5
All
Project: 1000967 Type WorK: Transit Projects
Oescp: FY 2006 SECTION 5311 CAPITAL FOR DOT
D1STRICT 4
Length: 0,00
TIP#:
Project: TOO0968 Type Work: Transit Projects D6scp: FY 2006 SECTION 5311 OPERATING FOR DOT
DISTRICT 4 Length: 000
TIP#:
Project: TOO0969 Type Work: Transit Projects
Dftocp,' FY 2006 SECTION 5311 CAPITAL FOR DOT
DISTRICT 5
Length: 0.00
TlP#:
Project 1000'970 Type Work: Transit Projects
OfJscp: FY 2006 SECTION 5311 OPERATING FOR DOT
DISTRICT 5
Length: 0.00
TlP#:
Project: TOO0971 Type Work: Transit Projects
Descp: FY 2006 SECTION 5311 CAPITAL FOR DOT
DISTRICT B
Length: 0.00
TlP#: ARCH53 I I
Project: 1000972 Type Work: Transit Projects Descp: FY 2006 SECTION 5311 OPERATING FOR DOT
DISTRICT 6 Length: 0,00
TIP#:
Project: TOO0973 Type Work: Transit Projects Descp: FY 2006 SECTION 5311 DISCRETIONARY CAPITAL
Length: 0.00 TIP#:
Project: 1000974 Type Worle Transit Projects
Descp: FY 2006 SECTION 5311 DISCRETIONARY
OPERATING
Length: 0.00
TIP#:
Project: TOO0975 Type Work: Transit Projects D6scp: FY 2006 INTERCITY BUS PROGRAM
Length: 0.00 T/P#:
Project: 1000976 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR
DISTRICT 1
Length: 0.00
TIP#:
Project: 1000977 Type Work: Transit Projects
~scp: FY 2006 SECTION 5310 CAPITAL FOR DHR
DISTRICT 2
Length: 0.00
TIP#:
Phase F"nd
CST Transit
Year
2006
Phase Fund CSI transit
Vea'
2006
Phase Fund CST Transit
Vea,
2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Vea,
2005
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Vea,
2006
Phase Fund CST Transit
Yea' 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Vea,
2006
Federal $2,680,000
State $335,000
Other $335,000
Federal $1,644.237
State
Other
$0 $1,644.237
Federal $137,920
State $17.240
Other $17.240
Federal $538,326
State $0
Other $538,326
Federal $1,059,680
State $132,460
Other $132,460
Federal $1,702,993
State
Other
$0 $1,702,993
Federal $240,000
State' $30,000
Other $30.000
Federal $300,000
State $0
Other $300.000
Federal $1,254,183
State $156.173
Other $156,773
Federal $172.978
State $43,245
Other $0
Federal $124,929
State $31,232
Other $0
Total $3.350.000
Total $3,288,474
Total $172,400
Total $1,076,652
Total $1.324.600
Tot.1 $3.405.986
Total $300.000
Total $600,000
Total $1,567,729
Total $216,223
Total $156,161
Page 22 of 300
~ ~
-.--------.---
.....
--
.....
v
~
-
~ ~
STATE TRANSPORTA TION IMPROVEMENT PROGRAM 20/2005
All
Project: 1000978 Type WorK: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR
OISTRICi 4
Length: 0.00
TIP#:
Project: 100Qt79 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR
DISTRiCTS
Length: 0.00
TlP#:
Project: TOOO981 Type Work.: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL. FOR DHR
DISTRICi 6 Length' 0.00
TlP#:
ProjeCt: TI)OO982 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR
DISTRICT?
Length: 0.00
TIP#:
Project: TOO0983 Type Work: Transit Projects Descp: FY 2006 SeCTlON 5310 CAPITAl. FOR DHR
DISTRICT B Length: 0.00
TJP#:
Project It)009a4 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAl- FOR DHR
DISTRICT 9
Length: 0.00
TIP#:
ProjeCt: TOO0985 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR
DISTRICT 10
Length: 0.00
TIP#:
Project TOO0986 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR
DISTRICT 11 Longth: 0.00
TIP#:
Project: TOO09B7 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR
DISTRICT 12 Length: 0.00
TJP#:
Project: TOO1194 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT
DISTRICT 1 Length: 0.00
TJP#:
Project: TOO1195 Type Work: Transit Projects
Descp: FY 2007 SECTION 5311 OPERATING FOR DOT
DISTRICT 1
Length: 0.00
TJP#:
Phase Fund
CST Transit
Year 2006
Federal $127,331
State $31,833
Phase Fund CST Transit
Vear
2006
Federal $88,892
State $22,223
Phase Fund CST Transit
Vear
2006
Federal $60,062
State $15,016
Phase Fund CST Transit
Year 2006
Federal $52,854
State $13,214
Phase Fund
CST Transit
Vear
2006
Federal $86,490
State $21,822
Phase Fund
CST Transit
VNr
2006
Federal $88,892
State $22,223
Phase Fund
CSl Transit
VNr
2006
Federal $93,696
State $23,424
Phase Fund
CST Transit
Vear
2006
Federal $31,232
State $7,808
Phase Fund
CST Transit
Year 2006
Federal $403,817
State $100,904
Phase Fund
CST Transit
Vear
2007
Federal $225.600
State $28,200
Phase Fund
CST Transit
Vear
2007
Federal $645.270
Stat. $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
OCher $28,200
Other $645,270
ToYI $159,164
Toyl $111,115
Total $75,078
Total $88,088
Total $108,112
Total $111,115
Total $117,120
Total $39,040
Total $504,521
Total $282,000
Tom,
$1,290,540
Page 23 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5
All
Project: TOO1196 Type Work: Transit Projects
Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT
DISTRICT 2
Length: 0.00
TlP#:
Project: TOO1197 Type Work: Transit Projects
Descp: FY 2007 SECTION 5311 OPERATING FOR DOT
DISTRICT 2
Length: 0.00
TlP#:
Project: TOO1198 Type Work: Transit Projects
Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT
DISTRICT 3
Length: 0.00
TIP#: AR-HE-5311
Project: TOO1199 Type Work: Transit Projects
Descp: FY 2007 SECTION 5311 OPERATING FOR GDOT
DISTRICT 3
Length: 0.00
TIP#: AR-HE-5311
Project: TOO1200 Type Work: Transit Projects
Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT
DISTRICT 4
Length: 0.00
TIP#:
Project: T001201 Type Work: Transit Projects
Descp: FY 2007 SECTION 5311 OPERATING FOR DOT
DISTRICT 4
Length: 0.00
TlP#:
Project: TOO1202 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT
DISTRICT 5 Length: 0.00
TIP#:
Project: TOO1203 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 OPERATING FOR DOT
DISTRICT 5 Length: 0.00
TlP#:
Project: TOO1204 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT
DISTRICT 6 Length: 0.00
TIP#:
Project: TOO1205 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 OPERATING FOR DOT
DISTRICT 6 Length: 0.00
TlP#:
Project: TOO1206 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 DISCRETIONARY CAPITAL
Length: 0.00 TlP#:
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Federal $529,200
State $66,150
Other $66,150
Federal $1,058,043
State $0
Other $1,058,043
Federal $84,800
State $10,600
Other $10,600
Federal $222,964
State $0
Other $222,964
Federal $2,168,000
State $271,000
Other $271,000
Federal $1,750,689
State $0
Other $1,750,689
Federal $187,200
State $23,400
Other $23,400
Federal $576,755
State $0
Other $576,755
Federal $601,360
State $75,170
Other $75,170
Federal $1,771,369
State $0
Other $1,771,369
Federal $240,000
State $30,000
Other $30,000
Total $661,500
Total $2,116,086
Total $106,000
Total $445,928
Total $2,710,000
'...''
Total $3,501,378
Total $234,000
Total $1,153,509
t
Total $751,700
Total $3,542,737
Total $300,000
Page 24 01300
t
:'.''....'e..1.'''
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5
All
Project: TOO1207 Type Work: Transit Projects Descp: FY 2007 INTERCITY BUS PROGRAM
Length: 0.00 TlP#:
Project: TOO1208 Type Work: Transit Projects
Descp: FY 2007 SECTION 5311 DISCRETIONARY
OPERATING
Length: 0.00
TlP#:
Project: TOO1209 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 1
Length: 0.00
TlP#:
Project: TOO1210 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 2
Length: 0.00
TIP#:
Project: TOO1211 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 4
Length: 0.00
TIP#:
Project: TOO1212 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 5
Length: 0.00
TlP#:
Project: TOO1213 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 6
Length: 0.00
TIP#:
Project: TOO1214 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 7
Length: 0.00
TIP#:
Project: TOO1215 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 8
Length: 0.00
TlP#:
Project: TOO1216 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 9
Length: 0.00
TlP#:
Project: TOO1217 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 10
Length: 0.00
TIP#:
Phase Fund CST Transit
Year 2007
Federal $1.254.183
State $156,773
Phase Fund CST Transit
Year 2007
Federal $300,000
State $0
Phase Fund CST Transit
Year 2007
Federal $181,628
State $45,407
Phase Fund CST Transit
Year 2007
Federal $131,175
State $32,794
Phase Fund CST Transit
Year 2007
Federal $133,698
State $33,425
Phase Fund CST Transit
Year 2007
Federal $93,337
State $23,334
Phase Fund CST Transit
Year 2007
Federal $63,065
State $15,766
Phase Fund CST Transit
Year 2007
Federal $55.498
State $13.874
Phase Fund CST Transit
Year 2007
Federal $90,814
State $22,703
Phase Fund CST Transit
Year 2007
Federal $93,337
State $23,334
Phase Fund CST Transit
Year 2007
Federal $98,381
State $24,595
Other $156,773
Other $300,000
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Total $1.567.729
Total $600.000
Total $227.035
Total $163.969
Total $167.123
Total $116.671
Total $78.831
Total $69.372
Total $113,517
Total $116,671
Total $122,976
Page 25 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aJZQQ5
All
Project: T001218 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 11 Length: 0.00
TlP#:
Project: T001219 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 12
Length: 0.00
TIP#:
Phase Fund CST Transit
Year 2007
Federal $32,794
State $8,198
Phase Fund CST Transit
Year 2007
Federal $423,798
State $105,949
Other
$0
Total $40,992
Other
$0
Total $529,747
\e
: Page 26 of 300
t'
.'.0 .'.J .'.)
,:
t.
..''.'t l
,I\"
't.:'
......''t1"i'''''' .''i
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aJ2QQ5
Appling
Project: 0001218 Type Work: Replace Bridge
Descp: SR 4IUS 1 @BLACKWATER&SWEETWATER
CKS S OF BAXLEY Lanes: Exist. 2 Prop. 4
Length: 1.00
TIP#:
Project: 0008528 Type Work: Sidewalks
Descp: SURRENCY'S SIDEWALK IMPROVEMENT PROJECT Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 522300. Type Work: Widening
Descp: SR 4IUS 1 FM BACON CL TO N OF SR 15/BAXLEY
INCL 3BRIDGES Lanes: Exist. 2 Prop. 4
Length: 9.10
TIP#:
Project: 533170. Type Work: Replace Bridge Descp: SR 15@ BIG SATILLA CREEK & OfF AT
PIERCE/APPLING COUNTY LN Length: 1.39
TIP#:
Phase Fund
PE
NHS
CST Bridge
Year Underway
2007
Federal $1,976,800
State $494,200
Phase Fund CST STP
Year LUMP
Federal $82,400
State $0
Phase Fund
PE
State
PE
Bond
ROW Bond
CST Bond
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005 2007
Year Underway Underway
2005
Federal
State
$0 $0
Federal
$4,605,000 $10,712,000
State
$3,533,600
$883,400
Other $0
Total $2,471,000
Other $20,600
Total $103,000
Other
Total
$0 $0
Other
$4,605,000 $10,712,000
Total
$0
$4,417,000
Page 27 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012 00 5
Atkinson
Project: 00006088 Type Work: Replace Bridge Descp: SR 135@DARKBAYCREEKAPP4 MI N OF
WILLACOOCHEE Length: 0,45 TlP#:
Project: "70'10- Type Work: Replace Bridge Descp: CR 42 NORTH OF SR 520 @ PUDDING CREEK
Leng/h" 0.50 TJP#:
Phase
PE
ROW
CST
Fund Bridge Brll:lge Bridge
Year
Underway Underway
2005
Phase Fund
PE Bridge
ROW lOGO' CST Bridge
Y. ., 2005 LOCl
Aher2007
Federal
$1.098,400
Federal $37.600
$0
Sfafe
$274,600
srere
$9,400
$0
Other
10
Other
$0 $0
To,.,
$1.373.000
Togi $47.000 SO
Page 28 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Bacon
Project OOOMS5 fype Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @VARIOUS lOC IN
DISTRICT 5
Length: 0.00
LUMP SUM PROJECT
TJP#:
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $280,000
State 570,000
Other
so
5350,000
,..
Pa"e 29 0' 300
STA TE TRA NSPOR TATlON IMPROVEMENT PROGRAM
2/7/2005
Baker
Project: 431710-
Type Work: Replace Bridge
Descp: SR 91/PETER ZACK GEER HWY @
ICHAWAYNOCHAWAY CK N OF SR 253 Length: 0.80
TlP#:
Project: 442860- Type Work: Replace Bridge
Descp: CR 67/JONES ROAD @ MILL CREEK APP 16 MI NW
OF NEWTON
Length: 0.21
TlP#:
Project: 471420.
Type Work: Replace Bridge
Descp: CR 121/CLEAR LAKE ROAD @
CHICKASAWHATCHEE CREEK E OF SR 37 Length: 0.44
TlP#:
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2005
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2005
Federal
$2,644,000
Federal $0
$408,800
Federal $0
$816,000
State
$661,000
State $0
$102,200
State $0
$204,000
Other
$0
Other $10,000
$0
Other $50,000
$0
Total $3.305.000 Total $10,000
$511,000
Total
$50,000
$1,020,000
.'~I
Page 30 of 300
.1
..,'
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Baldwin
Project: 0000346 Type Work: New Construction
Descp: FALL LINE FWY ON NEW LOC FM US
441/WILKINSON CO TO SR 24
Lanes: Exist. 0 Prop, 4
Length: 9.33
TIP#:
Project: 0004527 Type Work: Intersection Improvement Descp: SR 243/US 441 @ CR 466/SWINT & CS
670/CARAKER/MILLEDGEVILLE Length: 0.20
LUMP SUM PROJECT
TIP#:
Project: 0006017 Type Work: Intersection Improvement
Descp: SR 22 @ NORTH JEFFERSON ST IN
MILLEDGEVILLE
Length: 0.40
LUMP SUM PROJECT
TIP#:
Project: 0006028 Type Work: MedianWorl<.
Descp: SR 24/US 441/NORTH COLUMBIA ST FM LOG
CABIN RD TO MLK AVE
Length: 4.67
T1P#:
Project: 0006471 Type Work: Replace Bridge Descp: CR 69/BROWNS CROSSING RD @ FISHING
CREEK Length: 0.40
TIP#:
Project: 0006491 Type Work: Intersection Improvement Descp: SR 29/US 441/ROBERSON MILL ROAD @ CR
10/GARRETT WAY Length: 0.19
LUMP SUM PROJECT
TIP#:
Project: 0006690 Type Work: Multi-use Trail Descp: OCONEE RIVER GREENWAY AND RIVERFRONT
PARK Length: 0.00
TIP#:
Project: 222280. Type Work: Widening
Descp: SR 24/SR 540 FM SOUTH OF CR 186 TO CR 10 IN
WASHINGTON CO Lanes: Exist. 2 Prop. 4
Length: 7.80
T1P#:
Project: 231450- Type Work: Widening
Descp: SR 49 FM JUST W. OF FELTON RD TO EAST OF
MILLEDGEVILLE BYP Lanes: Exist. 2 Prop. 4
Length: 2.80
TIP#:
Project: 232240. Type Work: Intersection Improvement
Descp: SR 221SR 24 AT LAKE LAUREL RD/CR 472 EAST
OF MILLEDGEVILLE
Length: 0.45
LUMP SUM PROJECT
TIP#:
Project: 232260. Type Work: Replace Bridge Descp: SR 22@ CS 558 TATTNALL STREET IN WEST
MILLEDGEVILLE Length: 0.21
TIP#:
Phase Fund ROW Bond CST Bond
Year Underway
2007
Phase Fund ROW Local CST STP
Year LOCL LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year 2006 LOCL After 2007
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund CST EARM
Year 2005
Phase Fund
PE
HPP
ROW HPP
CST Bond
Year Underway
2005 2007
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year Underway
2006 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
LUMP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 After 2007
Federal
State
$0 $48,487,000
Other $0
Federal $0
$377,100
State $0
$41,900
Other $1,064,276
$0
Federal $27,900
$113,400
Federal $200,000
State $3,100
$12,600
State $50,000
Other $0 $0
Other $0
Federal $34,400 $0
State $8,600 $0
Other $0
$50,000
Federal $297,000
State $33,000
Other $0
Federal $250,000
State $0
Other $0
Federal
State
$2,251,200 $0
$562,800 $21,994,000
Federal $440,000
State $110,000
Other $0 $0
Other $0
Federal
State
Other
$1,026,000 Federal $16,000
$114,000 State
$4,000
$0 Other
$0
Total $48,487,000
Total $1,064,276
$419,000
Total $31,000
$126,000 Total $250,000
Total $43,000 $50,000
Total $330,000
Total $250,000
Total $2,814,000 $21,994,000
Total $550,000
Total
$1,140,000 Total $20,000
Page 31 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2QQ5
Baldwin
Project: 245405. Type Work: Replace Bridge
Descp: SR 243/US 441 BUS. @ FISHING CREEK IN
MILLEDGEVILLE
Length: 0.23
TfP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Year underway
2006 Atter2007 Atter2007
Federal $434,400
State $108,600
Other $0
Total $543,000
.
Page32of300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2flI2QQ5
Banks
Project: 0004596 Type Work: Water Pollution Mitig. Descp: 279.5 STREAM CREDITS FOR PI
142265-IBRST-0885(3) Length: 0.00
LUMP SUM PROJECT
TfP#:
Project: 0005921 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ 5 LOCS ALONG SR 15/US 441 Length: 0.00
LUMP SUM PROJECT
TfP#:
Project: 0006601 Type Work: Sireeiscapes Descp: TOWN OF HOMER HISTORIC US 441
REVITALIZATION PROGRAM Length: 4.06
LUMP SUM PROJECT
TIP#:
Project: 110670- Type Work: Widening Descp: 1-85FM N/SR 15/US 441 TO N/SR 63
Lanes: Exist. 4 Prop. 6
Length: 4.50 TIP#:
Project: 110680- Type Work: Widening Descp: 1-85FM NISR 63 TO NISR 51 IN FRANKLIN COUNTY
Lanes: Exist. 4 Prop. 6
Length: 6.10 TfP#:
Phase Fund ROW STP
Year LUMP
Federal $9,600
State $2,400
Phase Fund CST STP
Year LUMP
Federal $320,000
State $80,000
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase Fund PE NHS PE NHS CST Bond
Year Underway
2005 After 2007
Federal $1,440,000
Phase PE PE CST
Fund NHS NHS Bond
Year Underway
2005 After 2007
Federal $2,000,000
State $360,000
State $500,000
Other $0
Other $0
Other $125,000
Other $0
Other $0
Total $12,000
Total $400,000
Total $625,000
Total $1,800,000
Total $2,500.000
Page 33 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 20/2005
Barrow
Project: 0001038 Type Work: Descp: SR 124 @ SR 211
Intersection Improvement
Length: 0.40 TIP#: BA-002
Project: 0006326 Type Work: New Construction
Descp: WEST WINDER BYP FM MATTHEWS SCH RD TO
PEARL PENECOST RD-PH 1
Lanes: Exist. 0 Prop. 2
Lenglh: 0.34
TIP#: BA-005A
Project: 0006327 Type Work: Widening Descp: WEST WINDER BYP FM SR 316 TO SR 211 - PH II
Lanes: Exist. 2 Prop. 4
Length: 3.37 TIP#: I3A-005B
Project: 0006449 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS
LOCATIONS IN BARROW COUNTY Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 110610 Type Work: Widening
Descp: 1-85 FM HAMIL TON RD TO N/SR 211/FARM
MARKET RD IN BARROW
Lanes: Exist. 4 Prop. 6
Length: 6.30
TIP#: GW-AR-192
Project: 110620. Type Work: Widening
Descp: 1-85 FM N/SR 211 TO N/SR 60 IN JACKSON
COUNTY
Lanes: Exist. 4 Prop. 6
Length: 5.94
TlP#: I3A-008A&B
Project: 132970. Type Work: Replace Bridge Descp: SR l11WINDERMONROE HWY. @ MARBURG
CREEK SO OF WINDER Length: 0.18
TlP#: BA-OII
Project: 132971. Type Work: Replace Bridge Descp: SR llIWINDER-MONROE HWY @ SCOTT CREEK
1.7 MI S OF BETHLEHEM Length: 0.21
TlP#: BA-OI2A&B
Project: T001115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rail - Phase II
Length: 0.00 TlP#:
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Phase Fund PE STP CST STP
Year 2005 After 2007
Phase Fund PE STP CST STP
Year 2005 After 2007
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund PE NHS ROW NHS CST Bond
Year Underway
2006 After 2007
Phase Fund PE NHS ROW NHS CST Bond
Year Underway
2005 2007
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2007
Phase Fund PE Bridge ROW Bridge CST Bridge CST STP
Phase Fund CST HPP
Year Underway
2006 After 2007 After 2007
Year 2005
Federal $80,000
State $20,000
Federal $4,000
State $1,000
Federal $4,000
State $1,000
Federal $224,000
State $56,000
Federal $4.116,000
State $1.029,000
Federal
State
$320,000 $0
$80,000 $13,495,000
Federal
State
$1.380,800 Federal $16,000
$345,200 State
$4,000
Federal $5.702,000
State $1,425,500
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0 $0
Other
$0 Other
$0
Other $0
Total $100,000 Total
$5.000
Total $5,000
Total $280,000 Total $5.145,000 Total $400,000 $13,495,000 Total $1,726,000 Total $20,000 Total $7.127,500
Page 34 of 300
.'
STATE TRANSPORTA TION IMPROVEMENT PROGRAM 217/2005
Bartow
Project: 0000291 Type Work: RR Corridors
Descp: OLD ALA RD/SR 113 RELOC FM EAST OF SR 293
@ CSX RR TO 1-75 Lanes: Exist. 0 Prop. 4
Length: 1.18
TlP#: 8T-027A
Project: 0000397 Type Work: Intersection Improvement
Descp: SR 3/US 41 @ CR 1097 & CR 397--RELOCATE
INTERSECTION
Length: 0.30
TlP#:
Project: 0000932 Type Work: Interchange Descp: 1-75/SR401 UPGRADES @ SR 61
Length: 0.20 TlP#:
Project: 0000994 Type Work: Intersection Improvement
Descp: SR 3IUS 41 AT GRASS DALE RD/CR 155 & IRON
BELT RD/CR 232
Length: 0.30
TlP#:
Project: 0002626 Type Work: Interchange
Descp: US 41/SR 3 AND US 411/SR 61 INTERCHANGE
RECONSTRUCTION
Lanes: Ex/st. 2 Prop. 4
Length: 0.98
TlP#:
Project: 0003082 Type Work: Replace Bridge
Descp: CR 9821PERRY ROAD @ LITTLE PINE LOG CREEK
8 MI NW OF WHITE
Length: 0.40
TlP#:
Project: 0003450 Type Work: Replace Bridge Descp: CR 2321IRON BELT RD @ NANCY CREEK 3.3 MI
NW OF CARTERSVILLE Length: 0.20
TlP#:
Project: 0003770 Type Work: Roadway Project
Descp: CR 633/GLADE RD FM CR 384/BARTOW CARVER
TO CR 605/HOMESTEAD
Lanes: Exist. 2 Prop. 3
Length: 4.00
TlP#: 8T-015
Project: 0004591 Type Work: Water Pollution Mitig.
Descp: 873 STREAM CREDITS FOR PI
621350-/STP-012-1(71 )
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0004888 Type Work: Intersection Improvement Descp: SR 3/US 41 AT CR 179/CEDAR CREEK ROAD
LUMP SUM PROJECT
Length: 0.20 TlP#:
Project: 0005870 Type Work: Bridge Rehab
Descp: CR 204/NALLEY ROAD @ LITTLE PINE LOG CREEK
7.2 MI N OF WHITE
Length: 0.40
TlP#:
Phase Fund ROW STP CST STP
Year 2005 After 2007
Phase PE ROW CST
Fund STP STP STP
Year 2007 After 2007 After 2007
Phase Fund CST 1M
Year 2007
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL 2007
Phase Fund ROW STP CST STP
Year 2005 2006
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2007
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2006
Phase Fund PE STP CST STP
Year 2006 After 2007
Phase Fund ROW STP
Year LUMP
Phase PE ROW CST
Fund STP STP STP
Year Underway
LUMP LUMP
Phase Fund PE State ROW Local CST State
Year Underway
LOCL 2005
Federal $1,487,700
State $371,925
Federal $52,000
State $13,000
Federal $2,520,000
State $280,000
Federal
$0 $367,200
State
$0 $91,800
Federal $720,000 $9,104,000
State $180,000 $2,276,000
Federal
$0 $517,600
Federal
$0 $1.012,000
Federal $308,000
State $0
$129,400
State $0
$253,000
State $77,000
Federal $28,800
State $7,200
Federal
$20,160 $212,400
Federal
$0 $0
State $2,240
$23,600
State $0
$500,000
Other $0
Other $0
Other $0
Other $458,000
$0 Other
$0 $0
Other $10,000
$0 Other $38,000
$0 Other
$0
Other $0
Other $0 $0
Other $0 $0
Total $1,859,625
Total $65,000
Total $2,800,000
Total $458,000 $459,000
Total $900,000 $11,380,000
Total $10,000 $647,000
Total $38,000 $1,265,000
Total $385,000
Total $36,000
Total $22,400 $236,000
Total $0
$500,000
Page 35 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Bartow
Project: 0006297 Type Work: Barriers
Descp: 1-75CABLE MEDIAN BARRIERS IN BARTOW
COUNTY
Length: 14,00
LUMP SUM PROJECT
TlP#:
Project: 0006583 Type Work: Multi-use Trail Descp: CITY OF EUHARLEE SHARED-USE PATHWAY
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006619 Type Work: Streetscapes Descp: ADAIRSVILLE PUBLIC SQUARE STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006620 Type Work: Streetscapes Descp: CARTERSVILLE MAIN STREET STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006669 Type Work: Rights-Of-Way Descp: SR 20/US 411 ACCESS RIGHTS FROM FLOYD
COUNTY TO SR 3/US 41 Length: 11.52
TlP#:
Project: 620832- Type Work: Replace Bridge Descp: SR 61/SR 113@ ETOWAH RIVER & APPROACHES
Lanes: Exist. 2 Prop. 4
Length: 0.63 TlP#:
Project: 621255- Type Work: Widening
Descp: SR 61/SR 113 FM CR 533 NO TO PLYMOUTH
DRiCARTERSVILLEIEXC BR
Lanes: Exist. 2 Prop. 4
Length: 2.61
TlP#:
Project: 621350- Type Work: Widening
Descp: SR 20 FM 1-75TO US 411/SR 61 PART
RELOCATION
Lanes: Exist. 2 Prop. 4
Length: 2.47
TlP#:
Project: 621415- Type Work: Widening
Descp: OLD ALA RD/SR 113 RELOC FM CR 699 TO EAST
OF SR 293 @ CSX RR
Lanes: Exist. 2 Prop. 4
Length: 1.95
TIP#:
Project: 621710- Type Work: Passing Lanes
Descp: SR 20 EB & WB MP 17.8-19.3; EB 19.3-20.75; WB
MP20.75-21.95
Lanes: Exist. 2 Prop. 3
Length: 4.15
TIP#:
Project: 621760. Type Work: Replace Bridge Descp: STATE ROUTE 113 @ RICHLAND CREEK
Length: 0.40 TlP#:
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $998,100
State $110,900
Phase Fund CST STP
Year LUMP
Federal $232,000
State $0
Phase Fund CST STP
Year LUMP
Federal $350,400
State $0
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase Fund PE NHS ROW NHS
Year 2005 After 2007
Federal $4,000
State $1,000
Phase Fund
PE
Bridge
ROW Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
STP
ROW STP
ROW STP
CST STP
Phase Fund PE STP ROW STP CST STP
Year Underway Underway Underway
2005
Year Underway Underway Underway
2005
Year Underway
2005 2006
Phase Fund ROW STP CST STP
Year 2005 After 2007
Federal
State
$2.095,200 Federal
$523.800 State
$7,673,600 Federal
$3,456,000 $9,652,000
$1,918,400 State
$864,000 $2,413,000
Federal $2,338,200
State $584,550
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2006
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006
Federat
$2,212,800 $6,686,400
State
$553,200 $1,671,600
Federal
$16.000 $264,000
State
$4,000 $66,000
Other $0
Other $58,000
Other $87,600
Other $125,000
Other $0
Other
$0 Other
$0 Other
$0 $0 Other $0
Other $0 $0
Other $0 $0
Total
$1,109,000 Total
$290,000
Total
$438,000
Total $625,000 Total $5.000 Total $2.619.000 Total $9,592.000 Total $4,320,000 $12,065,000 Total
$2,922.750
Total $2,766,000 $8,358,000 Total $20,000 $330,000 Page 36 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2J7I2QQ5
Bartow
Project: 631510. Type Work: Bridge Rehab Descp: SR 20 AT STAMP CREEK 5.8 MI SE OF WHITE
Length: 0.22 TIP#:
Project: 631515- Type Work: Bridge Rehab Descp: SR 20 @ BOSTON CREEK 6.2 MILES SE OF WHITE
Length: 0.22 TIP#:
Project: 641870- Type Work: Intersection Improvement Descp: SR 293 @ GRASSDALE RD/CR 155
Length: 0.26 TlP#:
Project: 661950. Type Work: New Construction Descp: US 411 RELOC FM SR 20/3/US 41 TO 1-75
Lanes: Exist. 0 Prop. 4
Length: 6.53 TlP#: See AR 230
Project: 671225. Type Work: Replace Bridge
Descp: CR 851/HARDIN BRIDGE ROAD @ ETOWAH RIVER
NORTH OF EUHARLEE Lanes: Exist. 1 Prop. 2
Length: 0.27
TIP#:
Project: M002386 Type Work: Bridge Painting
Descp: PROPOSED BRIDGE PAINTING AT SEV LOCS IN BARTOWIDADEIGORDON Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: M002789 Type Work: Bridges
Descp: 1-75@5LOCATIONS IN BARTOW & GORDON-
DECK REHAB
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: M002965 Type Work: Guardrail
Descp: 1-75FROM SR 5 CONNECTOR TO CR 633/RED TOP
MOUNTAIN ROAD
Length: 24.53
TlP#: AR126G
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2006
Federal
$30,600 $1,352,800
State
$7,650 $338,200
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2006
Federal
$19,200 $1,582,400
State
$4,800 $395,600
Phase Fund
PE
STP
ROW Local
CST STP
Year 2007 LOCL After 2007
Federal $24,000 $0
State $6,000 $0
Phase Fund
PE
State
PE
NHS
ROW NHS
CST NHS
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway Underway
2007 After 2007
Year Underway
LOCL 2007
Federal
$13,329,600 Federal $0
$1,558,400
State
$3,332,400
State $0
$389,600
Phase Fund CST 1M
Year LUMP
Federal $286,560
State $31,840
Phase Fund
PE
1M
CST 1M
Year LUMP LUMP
Federal $180,000 $1,800,000
State $20,000 $200,000
Phase Fund
PE
1M
CST 1M
Year 2005 2005
Federal $1,800,000 $38,400,000
State $200,000 $9,600,000
Other
$0 $0
Other
$0 $0
Other $0 $0
Total
$38,250 $1,691,000
Total
$24,000 $1,978,000
Total $30,000
$0
Other
Total
$0
$16,662,000
Other
$10,000 $0
Total
$10,000 $1,948,000
Other $0
Total $318,400
Other $0 $0
Total $200,000 $2,000,000
Other $0 $0
Total $2,000,000 $48,000,000
Page 37 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM za/ZQQ5
Ben Hill
Project: 0005927 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS @ VAR LOCS IN
BEN HILLITURNERIWORTH Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006529 Type Work: Multi-use Trail Descp: JEFFERSON DAVIS HERITAGE TRAIL
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 432155- Type Work: Replace Bridge
Descp: SR 90 @ LITTLE HOUSE CREEK 7.1 MI N OF
FITZGERALD
Length: 0.47
TIP#:
Phase Fund CST STP
Year LUMP
Federal $1,040,000
Stale $260,000
Phase Fund CST STP
Year LUMP
Federal $308,000
Stale $0
Phase Fund PE Bridge ROW Bridge CST Bridge
Year UndelWay
2006 After 2007
Federat $16,000
State $4,000
Other $0
Other $77,000
Other $0
Total
$1,300,000
Total
$385,000
Total
$20,000
Page38of300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Berrien
Project: 0001913 Type Work: Intersection Improvement Descp: SR 11/US 129 @ CR 37/HAZEL AVENUE
LUMP SUM PROJECT
Length: 0.65 TlP#:
Project: 0006530 Type Work: Streetscapes
Descp: NASHVILLE DOWNTOWN STREETS CAPE
PROJECT
Lenglh: 0.00
LUMP SUM PROJECT
TIP#:
Project: 442920- Type Work: Replace Bridge
Descp: SR 64/SR 168 @ ALAPAHA RIVER & OVERFLOW @
BERRIEN/LANIER LN
Length: 1.08
TlP#:
Project: 442925. Type Work: Replace Bridge
Descp: SR 168 @ TEN MILE CREEK 4.0 MI EAST OF JCT
SR 11
Length: 0.32
TIP#:
Project: 442930- Type Work: Replace Bridge
Descp: SR 168 @ FIVE MILE CREEK 3 MI WEST OF JCT
SR 135
Length: 0.28
TIP#:
Project: 442961. Type Work: Replace Bridge Descp: SR 122@ CAT CREEK APP 9 MI E OF HAHIRA
Length: 0.25
TIP#:
Project: 442991- Type Work: Replace Bridge Descp: SR 37 @ WITH LACOOCHEE RIVER & OVERFLOW
AT COOK-BERRIEN CO LN Length: 0.95
TIP#:
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2006 2006
Year Underway Underway
2005
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway
2005
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Federal $411,300 $833,400 Federal $463,200
Federal
$2,960,800 $299,200 Federal
$916,080 Federal
$1,083,200 Federal
$1,403,200 Federal
$3,852,000
State $45,700 $92,600 State
$0
State
$740,200 $74,800 State
$229,020 State
$270,800 State
$350,800 State
$963.000
Other $0 $0
Other $115,800
Other
$0 $0 Other
$0 Other
$0 Other
$0 Other
$0
Total $457,000 $926,000 Total $579,000
Total
$3,701,000 $374,000 Total
$1,145,100 Total
$1,354,000 Total
$1.754.000 Total
$4.815,000
Page 39 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM WaDD5
Bibb
Project: 0000813 Type Work: Widening
Descp: SR 87/US 23 FROM SR 96fTWIGGS TO 1-16 IN BIBB
COUNTY Lanes: Exist. 2
Prop. 4
Lenglh: 19.96
TlP#: MCN-42
Project: 0000954 Type Work: Lighting
Descp: 1-16 FM E OF CENTRAL GA RR TO SR 87/US 129 IN
MACON-LIGHTING
Lenglh: 3.96
LUMP SUM PROJECT
TIP#: MCN-72
Project: 0001017 Type Work: Bicycle/Ped. Facility
Descp: DNR REC TRAILS - OCMULGEE GREENWAY TRAIL
FM 2ND TO GATEWAY
Length: 0.50
LUMP SUM PROJECT
TIP#: DNR-}
Project: 0001078 Type Work: Bicycle/Ped. Facility
Descp: DNR REC TRAILS - OCMULGEE GREENWAY TRAIL
FM SPRING TO 2ND
Length: 0.50
LUMP SUM PROJECT
TlP#: DNR-4
Project: 0001487 Type Work: Bicycle/Ped. Facility
Descp: DNR RECREATIONAL TRAILS PROG - CENTRAL CITY PARK TRAIL HEAD Length: 0.00
LUMP SUM PROJECT
TlP#: DNR-I
Project: 0001489 Type Work: Bicycle/Ped. Facility Descp: DNR REC TRAILS PROG - PIERCE AVENUE
WATER WORKS TRAIL HEAD Length: 0.00
LUMP SUM PROJECT
TlP#: DNR-I
Project: 0002487 Type Work: Lighting Descp: 1-75LIGHTING AT RIVERSIDE DRIVE
INTERCHANGE IN MACON Length: 0.40
LUMP SUM PROJECT
TlP#: MCN-79
Project: 0004455 Type Work: Widening
Descp: SR 11/INDUSTRIAL HWY FROM AVONDALE MILL
RD TO WALDEN RD Lanes: Exist. 2 Prop. 3
Length: 1.70
TlP#: MCN-77
Project: 0004595 Type Work: Water Pollution Mitig. Descp: 444 STREAM CREDITS FOR PI
312090-/NHIM-75-2(211 ) Length: 0.00
LUMP SUM PROJECT
TIP#: MCN-60
Project: 0006492 Type Work: Striping Descp: SIGNAGE & STRIPING @ VARIOUS RAIL
CROSSINGS IN BIBB & JONES Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 311000- Type Work: Widening
Descp: 1-16/MACON FM SR 11 EAST TO SR 87 INCL
BRIDGES & CD /EXC MLK
Lanes: Exist. 4 Prop. 6
Length: 1.86
TlP#: MCN-IO
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 After 2007 After 2007
Phase Fund
PE
Other
CST NHS
Year Underway
LUMP
Federal $256,000
Federal $1.200.000
State $64.000
State $300.000
Phase Fund CST Rec Trails
Year LUMP
Federal $100,000
State $0
Phase Fund CST Rec Trails
Year LUMP
Federal $100,000
State $0
Phase Fund CST Rec Trails
Year LUMP
Federal $100,000
State $0
Phase Fund CST Rec Trails
Year LUMP
Federal $100.000
State $0
Phase Fund CST NHS
Year LUMP
Federal $136.000
State $34.000
Phase Fund
PE
STP
CST STP
Year Underway
2006
Federal $176.000
State $44.000
Phase. Fund ROW STP
Year LUMP
Federal $14,400
State $3,600
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $48.000
State $0
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year Underway
2005 After 2007
Federal $1.972.000
State $493.000
Other $0
Other $0
Other $25,000
Other $25.000
Other $25.000
Other $25.000
Other $0
Other $0
Other $0
Other $0
Other $0
Total
$320,000
Total
$1.500.000 Total
$125,000
Total
$125.000
Total
$125,000
Total
$125,000
Total
$170,000
Total
$220,000
Total
$18.000
Total $48.000
Total
$2,465.000
Page 40 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM waDD5
Bibb
Project: 311005. Type Work: Bridge Rehab
Descp: 1-16IN MACON- BRIDGE AT MARTIN LUTHER KING
DRIVE Lanes: Exist. 4
Prop. 6
Length: 0.25
TIP#: MCN66
Project: 311400- Type Work: Widening
Descp: 1-75/MACON FROM PIERCE AVE/CR 478 EAST TO
1-16 Lanes: Exist. 4
Prop. 6
Length: 1.61
TIP#: MCN-13
Project: 311410- Type Work: Interchange
Descp: 1-16/175 FM 1-75@ HARDEMAN AVE TO 116 @
SPRING ST Lanes: Exist. 4 Prop. 6
Length: 1.10
TIP#: MCN9
Project: 311465- Type Work: Interchange Descp: 1-75/1-475 INTERCHANGE @ HARTLEY BRIDGE RD.
Length: 2.70 TlP#: MCNIB
Project: 311910- Type Work: Interchange Descp: 1-75NEW INTERCHANGE AT SARDIS CHURCH RD
Length: 0.20 TlP#: MCN15
Project: 312090. Type Work: Widening
Descp: 1-75FM PIERCE AVE/SR 247/US 41 TO
ARKWRIGHT ROAD
Lanes: Exist. 4 Prop. 6
Length: 2.47
TIP#: MCN60
Project: 322000 Type Work: Widening
Descp: SR 87/RIVERSIDE DR/MACON FM HALL RD TO
NORTHSIDE DR Lanes: Exist. 2 Prop. 5
Length: 2.40
TIP#: MCN-IS
Project: 322005. Type Work: Bridge Rehab Descp: SR 87/RIVERSIDE DR/MACON @ SABBATH CREEK
Lanes: Exist. 2 Prop. 4
Length: 0.50 TlP#: MCN-52
Project: 323015- Type Work: ATMS/ITS Descp: ATMS MAINTENANCE IN MACON FOR 2006
Length: 0.00 TIP#: MCN17
Project: 323030 Type Work: ATMS/ITS Descp: ATMS MAINTENANCE IN MACON FOR 2005
Length: 0.00
TlP#: MCN17
Project: 333055 Type Work: Intersection Improvement Descp: SR 87/MACON FM JOE TAMPLIN EXT TO &ALONG
WEAVER RD TO W.ELK Length: 1.80
TlP#: MCN69B
Phase Fund ROW NHS CST NHS
Year 2005 2007
Federal $1,510,400 $14,800,000
State $377,600 $3,700,000
Phase Fund
PE
NHS
ROW NHS
CST Bond
Year Underway
2006 After 2007
Phase PE ROW CST
Fund NHS NHS Bond
Year Underway
2007 After 2007
Phase Fund ROW 1M CST Bond
Year Underway
2006
Federal $35,520
State $8.880
Federal $206,400
State $51,600
Federal
State
$0 $55,000,000
Phase Fund
PE
NHS
ROW NHS
CST Bond
Year Underway
2006 2007
Phase Fund
PE
NHS
ROW NHS
CST Bond
Year Underway
2006 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway Underway
2006
Phase Fund
PE
Bridge
CST Bridge
Year Underway
2006
Federal
State
$2,463,200 $0
$615,800 $10,960.000
Federal $2,250,400
State $562,600
Federal
State
$5.600,000
$1,400.000
Federal $968,000
State $242,000
Phase Fund CST STP
Year 2006
Federal $160,000
State $40,000
Phase Fund CST STP
Year 2005
Federal $160,000
State $40.000
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL 2005
Federal
$0 $4.250,400
State
$0 $1,062,600
Other $0 $0
Total $1.888,000 $18,500.000
Other $0
Total $44,400
Other $0
Total $258,000
Other $0
Total $55.000,000
Other
$0 $0
Total
$3,079.000 $10,960,000
Other $0
Total $2.813,000
Other
Total
$0 Other
$0
$7,000.000 Total
$1.210,000
Other $0
Total $200,000
Other $0
Total $200,000
Other
$0 $0
Total
$0 $5,313,000
Page 41 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 27/2005
Bibb
Project: 333150. Type Work: Replace Bridge
Descp: SR 19/US 23 NBL & SBL @ WALNUT CREEK EAST
EDGE OF MACON
Length: 0.25
TIP#: MCN35
Project: 333152- Type Work: Replace Bridge
Descp: SR 87IUS 23 @ BEAVERDAM CREEK JUST NORTH
OF 1-75
Length: 0.30
TIP#: MCN38
Project: 350520. Type Work: Widening
Descp: FOREST HILL RD IN MACON FROM FORSYTH
ROAD TO WIMBISH ROAD
Lanes: Exist. 2 Prop. 4
Length: 0.75
TlP#: MCN22
Project: 351080- Type Work: Widening
Descp: JEFFERSONVILLE RD FM RECREATION RD TO
FALL LINE FWY/US 80 Lanes: Exist. 2 Prop. 4
Length: 1.20
TlP#: MCN28
Project: 351100- Type Work: Widening
Descp: CR 88/LOG CABIN DR FM SR 74/MERCER UNIV DR
TO HOLLINGSWORTH Lanes: Exist. 2 Prop. 4
Length: 0.90
TIP#: MCN26
Project: 351120- Type Work: Widening
Descp: BLOOMFIELD RD/LOG CABIN OR FM ROCKY CK
RD TO SR 221EI5ENHOWE
Lanes: EXist. 2 Prop. 4
Length: 2.04
TlP#: MCN-31
Project: 351130- Type Work: Widening
Descp: CR 723/FOREST HILL RD FM WIMBISH RD TO
NORTHSIDE DRICR 79 Lanes: Exist. 2 Prop. 3
Length: 1.80
TlP#: MCN-25
Project: 351135. Type Work: Replace Bridge
Descp: CR 723/FOREST HILL ROAD@SABBATH CREEK
NORTH OF SR 19 Lanes: Exist. 2 Prop. 3
Length: 0.20
TlP#: MCN-59
Project: 351140. Type Work: Widening Descp: NW PKWYNEW LOC FM LOG CABIN TO
NAPIER@PARK5TTHENTOSR 19
Lanes: Exist. 2 Prop. 4
Length: 2.10
TlP#: MCN-29
Project: 371774. Type Work: Bicycle/Ped. Facility Descp: OCMULGEE HERITAGE GREENWAY IN MACON
LUMP SUM PROJECT
Length: 1.00 TIP#: TEAI
Project: M002784 Type Work: Bridges Descp: 1-75 @ 6 LOCATIONS IN BIBB COUNTY DECK
REHAB Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2007 After 2007 After 2007
Year Underway
2005 2007
Federal $20,000
State $5,000
Federal
$10,400 $880,000
State
$2,600 $220,000
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2006
Federal
$471,200 $3,070,400
State
$117,800 $767,600
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Federal $1,762,400
State $440,600
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Federal $4,077,600
State $1,019,400
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2005
Federal
State
$5,444,000
$1,361,000
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2007
Federal
$40,000 $3,773,600
State
$10,000 $943,400
Phase Fund ROW STP CST Bridge
Year 2005 2007
Federal $40,000
$186,400
State $10,000 $46,600
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Federal $2,874,400
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Federal $0 $0
$800,000
Phase Fund
PE
1M
CST 1M
Year LUMP LUMP
Federal $202,500 $2,025,000
State
$718,600
State $0 $0 $0
State $22,500 $225,000
Other $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other
$0
Other $0 $0
Other $0 $0
Other $0
Other $0 $0
$200,000
Other $0 $0
Total $25,000
Total $13,000
$1,100,000 Total $589,000
$3,838,000 Total
$2,203,000
Total $5,097,000
Total
$6,805,000 Total $50,000
$4,717,000 Total $50,000 $233,000
Total $3,593,000
Total $0 $0
$1,000,000 Total $225,000
$2,250,000
Page 42 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM ZmZQQ5
Bibb
Project: TOO0658 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 OPERATING FOR MACON
Length: 0.00 TIP#:
Project: TOO0659 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR MACON
Length: 0.00 TIP#:
Project: TOO0660 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR MACON
Length: 0.00 TIP#:
Project: TOO0661 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR MACON
Length: 0.00 T1P#:
Project: TOO0678 Type Work: Transit Projects Descp: FY 2005 SECTION 3037 ACCESS TO JOBS MACON
Length: 0.00 TIP#:
Project: TOO0909 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 OPERATING FOR MACON
Length: 0.00 TIP#:
Project: TOO0910 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR MACON
Length: 0.00 T1P#:
Project: TOO0911 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR MACON
Length: 0.00 T1P#:
Project: TOO0912 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR MACON
Length: 0.00 TIP#:
Project: TOO0943 Type Work: Transit Projects Descp: FY 2006 SECTION 3037 ACCESS TO JOBS MACON
Length: 0.00 T1P#:
Project: T001238 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 OPERATING FOR MACON
Length: 0.00 T1P#:
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Year 2005
Year 2005
Year 2005
Year 2005
Year 2005
Year 2006
Year 2006
Year 2006
Year 2006
Year 2006
Year 2007
Federal $1,335,076
State $0
Other $1,335,076
Federal $644,650
State $80,581
Other $80.581
Federal $228,000
State $28.500
Other $28,500
Federal $57,202
State $14,300
Other $0
Federal $583,885
State $0
Other $583,885
Federal $1,361,778
State $0
Other $1,361,778
Federal $624,650
State $78,081
Other $78,081
Federal $228,000
State $28,500
Other $28.500
Federal $60,062
State $15,016
Other $0
Federal $0
State $0
Other $0
Federal $1,389,013
State $0
Other $1,389,013
Total $2,670.152
Total $805,812
Total $285.000
Total $71,502
Total $1.167,770
Total $2,723.555
Total $780,812
Total $285,000
Total $75.078
Total $0
Total $2.778.026
Page 43 of 300
STA TE TRA NSPOR TA TlON IMPROVEMENT PROGRAM 21712005
Bibb
Project: T001239 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR MACON
Length: 0.00 TlP#:
Project: T001240 Type Work: Transit Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR MACON
Length: 0.00 TIP#:
Project: T001241 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR MACON
Length: 0.00 TIP#:
Project: T001252 Type Work: Transit Projects Descp: FY 2007 SECTION 3037 ACCESS TO JOBS MACON
Length: 0.00 TlP#:
Project: T001280 Type Work: Transit Projects Descp: Macon Mullimodal Terminal Station
Length: 0.00 TlP#:
Project: T001281 Type Work: Transit Projects Descp: Macon Mullimodal Terminal Station Root Rehab.
Length: 0.00 TlP#:
Project: T001282 Type Work: Transit Projects Descp: Macon Altemative Fuel Vehicle Purchase
Length: 0.00 TIP#:
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Federal $644.650
State $80.581
Federal $228.000
State $28.500
Federal $63.065
State $15.766
Federal $0
State $0
Federal $3.460.633
State $0
Federal $265.603
State $0
Federal $235.742
State $0
Other $80.581
Other $28.500
Other $0
Other $0
Other $865.158
Other $66,400
Other $58.936
Total
$805.812
Total
$285.000
Total
$78.831
Total
$0
Total
$4.325.791 Total
$332.003
Total
$294.678
Page 44 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Sleckley
Project: 0001237 Type Work: Intersection Improvement
Descp: SR 67/US 23 AT CR 220/FRANK COOK ROAD EAST
OF COCHRAN
Length: 0.77
LUMP SUM PROJECT
TIP#:
Project: 0003904 Type Work: Intersection Improvement Descp: SR 67IUS 23 @ SR 26
LUMP SUM PROJECT
Length: 0.49 TlP#:
Project: 245336. Type Work: Replace Bridge
Descp: SR 126 @GUM SWAMP CREEK 5.6 MI E OF
COCHRAN
Length: 0.26
TlP#:
Phase Fund
PE
STP
ROW Local
CST STP
Year Undeoway
LOCL LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Undeoway
LUMP LUMP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 After 2007
Federal $0
$750,600
Federal $125,100 $1,350,000
Federal $16,000
State $0
$63,400
State $13,900 $150,000
State $4,000
Other $300,000
$0
Other $0 $0
Other $0
Total $300,000 $634,000
Total $139,000 $1,500,000
Total $20,000
Page 45 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2at2QQ5
Brantley
Project: 0006455 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN
DISTRICT 5
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006468 Type Work: Bridge Replacement Descp: CR 50 OVER BUFFALO CREEK
Length: 0.40 TIP#:
Project: 533158. Type Work: Replace Bridge
Descp: SR 15@ DIX BRANCH IN CITY LIMITS OF
HOBOKEN
Length: 0.39
TlP#:
Project: 533159. Type Work: Replace Bridge
Descp: SR 23/US 301 @ BUFFALO CREEK 1 MI NORTH OF
HICKOX
Length: 1.04
TIP#:
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $280,000
State $70,000
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year 2006 LOCL After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Federal $104,800
$0
Federal
$896,000 Federal
$1,963,200
State $26,200
$0
State
$224.000 State
$490,800
Other $0
Other $0
$50,000
Other
$0 Other
$0
Total $350,000
Total
$131,000
$50.000
Total $1.120,000
Total $2.454,000 Page 46 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
zmzOO5
Brooks
Project: 431170- Type Work: Replace Bridge
Descp: CR 305 @ CSX RAILROAD APPROX. 7 MILES W OF
QUITMAN GA
Length: 0.51
TIP#:
Project: 431900- Type Work: Replace Bridge
Descp: CR 305 BRIDGE REPLACEMENT APPROX 2 MILES
WEST OF QUITMAN
Length: 0.38
TIP#:
Project: 432150- Type Work: Replace Bridge Descp: SR 122 @ MEETINGHOUSE CK & LITTLE RIVER
BROOKS-LOWNDES CO LN Length: 1.09
TIP#:
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2007
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2006
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006
Federal
$0 $465,600
State
$0 $116,400
Federal
$0 $900,800
State
$0 $225,200
Federal
$37,600 $5,304,800
State
$9,400 $1,326,200
Other $0 $0
Other $10,000
$0
Other $0 $0
Total $0
$582,000
Total $10,000 $1,126,000
Total $47,000 $6,631,000
Page 47 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
zaJ2QQ5
Bryan
Project: 0002201
Type Work: Lighting
Descp: 195 @ SR 144 INTERCHANGE LIGHTING
LUMP SUM PROJECT
Length: 0.40 TIP#:
Project: 0006298 Type Work: Guardrail
Descp: 1-95@SEV LOCS GUARDRAIL REPLACEMENT IN
CAMDENIBRYANICHATHAM Length: 20.02
LUMP SUM PROJECT
TlP#:
Project: 0006456 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN
BRYAN/CHATHAM
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006941
Type Work: Special Studies
Descp: 1-95 @ CR 9/BELFAST SIDING ROAD IJR STUDY
LUMP SUM PROJECT
Length: 0.40 TlP#:
Project: 532600. Type Work: Passing Lanes
Descp: SR 144 PASSING LANES THROUGH FT
STEWART/BRYAN.L1BERTY
Lanes: Exist. 2 Prop. 3
Length: 5.01
TIP#:
Phase Fund CST NHS
Year LUMP
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund
PE
40450
Year LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Federal $160,000
State $40,000
Federal $292,500
State $32,500
Federat $336,000
State $84,000
Federal $0
State $100,000
Federal $763,200
State $190,800
Other $0
Other $0
Other $0
Other $0
Other $0
Total
$200,000
Total
$325,000
Total
$420,000
Total
$100,000
Total
$954,000
Page 48 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005
BUlloch
Project: 0003091 Type Work: Replace Bridge Descp: CR 153/CYPRESS LAKE RD@WATERINGHOLE
BRANCH 5MI SW/STATESBORO
Length: OAO
TlP#:
Project: 0003092 Type Work: Replace Bridge
Descp: CR 577/FAS 733 @ LOWER BLACK CREEK 6 MI S
OF BROOKLET
Length: 0.20
TIP#:
Project: 0005829 Type Work: Widening
Descp: SR 26/US 80 FM 5LN @ CR 491 TO CR 423/0LD
LEE FIELD RD Lanes: Exist. 2 Prop. 4
Length: 3.10
TlP#:
Project: 0006091 Type Work: Railroad Crossing Descp: CS 656/EAST JONES AVENUE @ NS #620196H
LUMP SUM PROJECT
Lenglh: 0.20 TlP#:
Project: 0006631 Type Work: Streetscapes
Descp: STATESBORO DOWNTOWN STREETSCAPE ENHANCEMENT-PHASE I Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006632 Type Work: Multi-use Trail Descp: S & S GREENWAY
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 521970- Type Work: Widening
Descp: SR 26/STATESBORO FM SR 67173/US 301 TO
BRANNEN ST/CS 802
Lanes: Exist. 4 Prop. 5
Length: 1.87
TlP#:
Project: 522460- Type Work: Widening Descp: SR 67 FM 1-16TO STATESBORO BYP
Lanes: Exist. 2 Prop. 4
Length: 10.85 TIP#:
Project: 522640- Type Work: Widening
Descp: E. STATESBORO BYP/SR 1018 FROM SR 73/US 25
TO SR 73/US 301
Lanes: Exist. 2 Prop. 4
Length: 6.85
TlP#:
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2005
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2006
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Phase Fund CST STP
Year LUMP
Federal $0
$819,200
Federal $0
$597,600
Federal $2,400,000
Federal $170,000
State $0
$204,800
State $0
$149,400
State $600,000
State $0
Phase Fund CST STP
Year LUMP
Federal $530,400
State $0
Phase Fund CST STP
Year LUMP
Federal $528,800
State $0
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Federal $323,200
State $80,800
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Federal $3,332,800
State $833,200
Phase Fund PE STP ROW STP CST STP
Year Underway Underway
2006
Federal
State
$6,560,000
$1,640,000
Other $10.000
$0 Other $5.500
$0 Other
$0
Other $0
Other $132,600
Other $132,200
Other $0
Other $0
Other
$0
Total $10,000 $1.024,000 Total
$5,500 $747,000 Total $3,000,000
Total $170,000
Total $663,000
Total $661.000
Total $404.000
Total $4,166.000
Total $8,200,000
Page 49 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2flI2QQ5
Burke
Project: 0006633 Type Work: Mulli-use Trail Descp: WAYNESBORO GREENWAY TRAIL
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 222480- Type Work: Widening
Descp: SR 121/US 25 SAVANNAH RIVER PKY FM CR
118/354 TO SR 24 @ BYP
Lanes: Exist. 2 Prop. 4
Length: 8.43
TlP#:
Project: 231260- Type Work: Passing Lanes
Descp: SR 24 PASSING LNS @ 4 LOC BET
WAYNESBORO&LOU'VILLEIJEFFERSON
Lanes: Exist. 2 Prop. 3
Length: 5.28
TIP#:
Project: 231960- Type Work: Replace Bridge Descp: SR 56 (3) BRIDGES OVER OGEECHEE RVR &
OVFL NE OF SUMMERTOWN Length: 0.82
TlP#:
Phase Fund CST STP
Year LUMP
Federal $650,400
State $0
Phase Fund PE State ROW Bond CST EARMK CST Bond
Phase PE ROW CST
Fund STP STP STP
Year Underway Underway
2005 2005
Year Underway
2005 2006
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 After 2007
Federal
State
$1,000,000 $0
Federal
$0 $16,631,000
State
$436,000 $1,995,200
$109,000 $498,800
Federal $40,000
State $10,000
Other $162,600
Other
$0 $0 Other $0 $0
Other $0
Total
$813,000
Total
$1.000,000
$16.631,000
Total
$545,000
$2,494.000
Total
$50,000
Page 50 of 300
,;
t
t~
, I)
4
\
.~
t\
"~ J .\
t;
~)
fl
.,'
"
.: 'J
..t'';;
.'t',\\
tj
t
....t\'\''
STATE TRANSPORTATION IMPROVEMENT PROG~AM 2!712QQ5
Butts
Project: 0000523 Type Work: Interchange Descp: 1-75AT SR 16/ARTHUR BOLTON PKWY
Lanes: Exist. 2 Prop. 4
Length: 1.10 TIP#:
Project: 0000760 Type Work: Widening Descp: SR 16 WIDEN FM 1-75TO CITY OF JACKSON
Lanes: Exist. 2 Prop. 4
Length: 7.36 TIP#:
Project: 0004147 Type Work: Intersection Improvement
Descp: SR 36 AT CR 43IKEYS FERRY RD; CR 289!BARNETTS BR & CR 265 Length: 0.68
LUMP SUM PROJECT
TIP#:
Project: 0006641 Type Work: Historic Facilities Descp: INDIAN SPRING HOTEL - PHASE 111
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 321800- Type Work: Bridge Rehab Descp: SR 16 OR SR 36 IN JACKSON @ SOUTHERN RR
Length: 0.40 TlP#:
Project: 322440. Type Work: Widening Descp: SR 36/JACKSON FM SR 16 TO CR 289/STARK RD
Lanes: Exist. 2 Prop. 4
Length: 0.63 TIP#:
Project: 332510.
Type Work: Replace Bridge
Descp: SR 16 OVER OCMULGEE RIVER AT JASPER
CL(M.L.17.45)
Length: 1.17
TlP#:
Project: 332520 Type Work: Widening
Descp: SR 16/ARTHUR BOLTON FM REHOBOTH
RD/SPALDING TO 1-75/BUTTS
Lanes: Exist. 2 Prop. 4
Length: 7.64
TIP#: SP-020
Project: 333170 Type Work: Replace Bridge
Descp: SR 36 @ TOWALIGA RIVER 7.5 MI SW OF
JACKSON
Length: 0.23
TlP#:
Project: 333171- Type Work: Replace Bridge
Descp: SR 36 @YELLOWWATER CREEK 1 MI N OF JCT
SR42
Length: 0.21
TIP#:
Project: 333172- Type Work: Replace Bridge
Descp: SR 36@SOUTH RIVER AT BUTTS-NEWTON CO
LINE
Length: 0.40
TIP#:
Phase Fund ROW 1M CST Bond
Year Underway
2005
Federal $0
State $6,490.000
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Federal $4.000.000
State $1.000.000
Phase Fund ROW Local CST STP
Year LOCL LUMP
Federal $0
$495,900
State $0
$55,100
Phase Fund CST STP
Year LUMP
Federal $280,000
State $0
Phase Fund ROW State CST State
Year 2007 After 2007
Federal $0
State $4,080.000
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Federal $89,600
State $22,400
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2005
Federal $3.628.800
State $907,200
Phase Fund
PE
STP
ROW STP
CST STP
CST STP
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway
2005 2005
Year Underway
2005 2007
Federal
$670,332 $17,448,000
Federal
$12.000 $880,000
State
$167.583 $4.362.000
State $3.000
$220.000
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2007 After 2007
Federal $12,000
State $3.000
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 After 2007
Federal $12.000
State $3,000
Other $0
Other $0
Other $207,200
$0
Other $70,000
Other $0
Other $0
Other
$0 Other
$0 $0 Other $0 $0 Other $0
Other $0
Total $6.490.000
Total $5.000.000
Total $207,200 $551,000
Total $350,000
Total $4.080.000
Total $112,000
Total
$4,536,000 Total
$837,915 $21,810,000
Total $15.000 $1,100.000 Total $15,000
Total $15,000
Page 51 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2at2QQ5
Butts
Project: MOO1004 TYPEl Work: Bridges
Descp: BRIDGE JACKING@ SEV LOCS IN
BUnSISPALDINGIHENRY COUNTIES
Lanes: Exist.
Prop
Length: 1,60
LUMP SUM PROJECT
TlP#' AR-JII
Project MOO2715 Ty~. W!lfk: Bridges
Descp: 1-75 @ CABIN CREEK IN BUTTS & $R 20 IN HENRY
DECK REHAB
Length: 0.80
LUMP SUM PROJECT
ne
Phase Fund
PE NHS
CST NHS
Year Undero.vay
LUMP
Federal $1,200.000
St.te $300,000
Pha$8 Fund
PE 1M
CST 1M
Y. .,
LUMP LUMP
Federal $90,000
$900,000
State $10,000 $100,000
Other $0
Other $0 $0
Total
$1,500,000
To,.,
$100.000 $1.000.000
Page 52 of 300
---------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
ZaJZQQ5
Calhoun
Project: "2950- Type Work' Replace Bridge Oescp: SR 216 @ LITTLE PACHITlA CREEK 1 MI N OF
EDISON Lenr/th: 0.44
TIP#. 'J'J-Ii.04
Project: A42951.
Type Work: Replace Bridge
Descp: SR 234 @ CHICKASAWHATCHEE CREEK 8 MI NE
OF LEARY
Length: 1.34
TIP#:
Phase Fund PE Bridge ROW Bridge CST Bridge CST STP
Phas9 Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
V..,
Underway Underway
2005 2005
V..,
UndelWsy 2005 2006 2006
Federal
$432.800 $702,400 Federal
$30,400 $858,400 $1.328.000
Stille
$108,200 $175,600 State
$7,600 $214,600 $332,000
Other
$0 $0 Other
$0 $0 $0
Torat
$541.000 $878,000
Tora,
$38,000 $1,073,000 $1.660,000
'-
"-..
Page 53 of 300
STA TE TRANSPORTATION IMPROVEMENT PROGRAM 20/2005
Camden
Project: 0000889 Type Work: Rest Area
Descp: 1-95 RECONSTRUCTION OF THE NORTH BOUND
WELCOM~ CE.NTER
Length: 0.40
TlP#:
Project: 0002801 Type Work: Interchange Descp: SR 40 ADD LEFT TURN STORAGE LANE AT 1-95
INTERCHANGE Length: 1.30
TfP#.-
Project: 00051$7 Type Work: Railroad Crossing Descp: CR 200/lAKES BLVD AT 8M #OOOO36C
LUMP SUM PROJECT
Length" 0.00 T/Pn:
Project: 0006291 Typo Work: Guardrail Descp: 1.95@SEV LOCS GUARDRAIL REPLACEMENT IN
CAMDENIBRYANICHATHAM Length: 20.02
LUMP SUM PROJECT
tu.
P~ct: 0006455
Type Worlc Signals
Oescp: UPGRADE TRAFFIC SIGNALS @VARIOUS LOC IN
DIST~ICT 5
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006701 Type Work' Po...emcnt Rehab Desep: ST MARY'S ROAD PAVING PROJECT
Length" 0.00 TlP#:
Project: 522080.
Type Work: Widening
Descp: SR 40 FM WieR 61 TO SR 25/US 17
Lanes: Exist. 2 Prop. 4
Length: 3,50 TIP#:
Phase
PE
ROW
CST
Fund
1M 1M 1M
Year Underway
2006 After 2007
Phase Fund
PE NHS CST NHS
Y.., 2007
Aft13r2007
Federal $152,100
Federal 5120,000
State $16,900
State $30,000
Phase Fund
CST STP
Year LUMP
Federal $175,000
State $0
Phase Fund
PE STP CST STP
Y..,
Underway LUMP
Federal $292,500
Scare $32,500
Phase Fund
PE STP CST STP
Ye"
Underway LUMP
Federal $280,000
Slalti' $70,000
Phase Fund
CST H170
Year 2005
Federal $100,000
S'.'v SO
Phllse Fund
PE STP ROW STP CST STP
Y..,
Underway
2007
After 2007
Fed&flJ1
~80,OOO
Stale $120,000
Other $0
Other $0
Other
$0
Other
SO
Other
$0
Other
$0
Other
SO
Tor.I $169,000
Toml $150,000
Toy/ $175.000
Tota' $325,000
TDr.1 $350,000
To~1
$100,000
Total
5600,000
Page 54 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
Za12QQ5
Candler
PfOjecl: 0OO284t Type Work' Replace Bridge
Descp: CR 223/ PORTAL HIGHWAY@lITTLE STOCKING HEAD CREEK Length: 0,63
TlP#.-
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
lQCL 2006
Federa'
$0 S181,600
Stat.
$0 $45,400
Other
$10,OQO
SO
Totll
$'0.000
$227,000
Project: 0002'42 Type Work: Replace Bridge DescP_" CR 2231PORTAL HIGHWAY @ BIG BRANCH B MI
NORTH OF M~TTE~ Length: 0.76
TlP#:
Project: OOO2t43 fype WQric: Replace Bridge Descp: CR 223/ PORTAL HIGHWAY@LOTTS CREEK 9 MI
NORTH OF METTER Length: 0.20
T1P#:
Phase Fund PE Bridge ROW Local CST Bridge
Y. .,
uncerwey LOCL 2006
Phase Fund PE Bridge ROW Local CST Bridge
Yellr Underway
LOCL 2006
Federal
$0 $213,800
Federal
$0 $458,000
State
So
$53.400
State
$0 $114,000
Other
$10,000
SO
Other
$10.000
So
Toy'
$10.000 $267.000
To,.,
$10.000 $570,000
.....
Project: 542400- Type Work: Replace Bridge
Descp: SR 46@ FIFTEEN MILE CREEK 2.8 Ml E. OF
l.
METTER
Leflglh: 076
L
TlP#.-
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Federal $2,359,200
State $589,800
OtheT $0
Tot.t
$2,949,000
L
Project: 542401- Type Work: Replace eridge
Phase Fund
Vea,
Federal
State
Other
Total
l.
Descp: SR 129@CANOOCHEERIVER&OVERFlOW4MI SOF METTER
PE Bridge ROW Bridge
Underway Underway
l.
Leflglh: 0.31 TlP#:
CST 6ridge
2005
$2,052.800
$513,200
$0
$2,566.000
l
l
l.
L
e
l. L L
~
L l. l. L
l.
l.-
I...
~
Page 55 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Carroll
Project: 0000758 Type Work: Realignment Descp: SR 113 RELOCATION IN THE CITY OF TEMPLE
Length: 0,20 TlP#:
Project: 0001357 Type Work: Replace Bridge
Descp: SR 16/US 27 ALT@CHATTAHOOCHEERIVERAT
COWETA CO LINE
Length: 1,20
TlP#: CW-035
Project: 0002281 Type Work: Historic Facilities
Descp: CARROLLTON HISTORIC DEPOT VISITOR'S
CENTER
Length: 0,00
LUMP SUM PROJECT
TIP#:
Project: 0004047 Type Work: Intersection Improvement
Descp: SR 166 AT NORTH AND WEST JONESVILLE
ROADS/CR 98/124
Length: 0,62
LUMP SUM PROJECT
TIP#:
Project: 0004730 Type Work: Intersection Improvement
Descp: SR 8/US 78 @ CR 644/ROCKY BRANCH RD AND
CS 80411N1LLA TRACE
Length: 0,34
LUMP SUM PROJECT
TIP#:
Project: 0006026 Type Work: Intersection Improvement Descp: SR 5 @ SR 16/US 27 ALT
LUMP SUM PROJECT
Length: 0.40 TlP#:
Project: 631490- Type Work: New Construction
Descp: VILLA RICA BYP EXTEND W,FM PROPOSED SR 61
BYPASS TO SR 101 Lanes: Exist. 0 Prop, 2
Length: 1.40
TlP#:
Project: 641910. Type Work: Passing Lanes
Descp: SR 100 NB MP 5,5-6,8; NB MP 13,3-14,55; SB MP
15,3-16,8
Lanes: Exist. 2 Prop, 3
Length: 4,05
TIP#:
Project: 642310. Type Work: Replace Bridge Descp: CR 829/CLEM-LOWELL RD @ WHOOPING CREEK
SOUTH OF CARROLLTON Length: 0,30
TIP#:
Project: 850620- Type Work: Miscellaneous Improvement Descp: SR 16/CARROLLTON FM COLUMBIA RD TO SR 1
DRAINAGE IMPROVMENTS Length: 1,10
TlP#:
Project: M002966 Type Work: Guardrail Descp: 1-20 FROM ALABAMA STATE LINE TO SR 1/US 27
LUMP SUM PROJECT
Length: 24,00 TlP#:
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund CST STP
Phase Fund
PE
STP
ROW Local
CST STP
Phase Fund
PE
STP
ROW Local
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
NHS
CST NHS
Year Underway
2007 2007
Year Underway
2005 2006
Year LUMP
Year Underway
LOCL LUMP
Year Underway
LOCL LUMP
Year LUMP LUMP LUMP
Year Underway
2007 After 2007
Year Underway Underway
2005
Year Underway
LOCL 2005
Year Underway
2007 After 2007
Year LUMP LUMP
Federal $160,000 $200,000
Federal $40,000
$2,556,000
Federal $600,000
Federal $0
$345,600
Federal $0
$188,100
Federal $77,400
$171,000 $894,600
Federal $502,400
Federal
$2,727,180
Federal $0
$676,000
Federal $1,336,800
Federal $1,600,000 $26,400,000
State $40,000 $50,000
State $10,000 $639,000
State $0
State $0
$38,400
State $0
$20,900
State $8,600
$19,000 $99,400
State $125,600
State
$681,795
State $0
$169,000
State $334,200
State $400,000 $6,600,000
Other $0 $0
Other $0 $0
Other $150,000 '
Other $832,000
$0
Other $639,600
$0
Other $0 $0 $0
Other $0
Other
$0
Other $10,000
$0
Other $0
Other $0 $0
...
Total $200,000 $250,000
Total $50,000 $3,195,000
Total 5750,000
Total 5832,000 5384,000
Total 5639,600 5209,000
Total $86,000 5190,000 5994,000
Total 5628,000
Total
..-:
$3,408,975 Total $10,000 $845,000 Total
$1,671,000
Total $2,000,000 533,000,000
Page 56 of 300
..
.;
t
t1
.'.1 .'t'..,'
.:'
.1
....t.....o.''''''''o
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aIZQQ5
Catoosa
Project: 0001418 Type Work: Intersection Improvement
Descp: SR 21BATTLEFIELD PARKWAY AT PINE GROVE
ROAD/CR6
Length: 0.36
LUMP SUM PROJECT
TIP#: 021-2
Project: 0001577 Type Work: Turn Lanes
Descp: SR 2 MEDIAN TURN LANES FROM FORT
OGLETHORPE TO 1-75
Length: 4.39
TIP#: GA-0203
Project: 0003948 Type Work: Intersection Improvement Descp: SR 31US41 AT GRAYSVILLE ROADICR 381
LUMP SUM PROJECT
Length: 0.41 TlP#: 021-3
Project: 0006609 Type Work: Wildlife mortality mitigation Descp: DEERVEHICLE COLLISION REDUCTION PROJECT
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 611210- Type Work: Interchange Descp: 1-75AT SR 1461CLOUD SPRINGS ROAD
Length: 0.59 TIP#: GA-OI
Project: 621530. Type Work: Widening
Descp: SR 151 FM ROLLINS IND PKlHOLCOMB RD TO US
41 @ RINGGOLD Lanes: Exist. 2 Prop. 4
Length: 2.03
TlP#: STP-98-2
Project: 631420- Type Work: Turn Lanes
Descp: SR2ISR 31US 41 AT SPARKS STREET IN
RINGGOLD Lanes: Exist. 2 Prop. 3
Length: 0.13
LUMP SUM PROJECT
TIP#: 035-1
Project: 631505- Type Work: Replace Bridge Descp: SR 2/US 41 @SOUTH CHICKAMAUGA CREEK IN
WEST RINGGOLD Length: 0.40
TlP#: BHF-99-4
Project: 632885- Type Work: Replace Bridge
Descp: SR 31US41 @TIGERCREEK 1.9 MI EAST OF
RINGGOLD
Length: 0.24
TIP#:
Project: 642190 Type Work: Widening
Descp: SR 151/00LTEWAH-RINGGOLD HWY FM US 41 NO
TO TENN STATE LINE Lanes: Exisl. 2 Prop. 4
Length: 5.19
TIP#: STP-98
Project: 642210. Type Work: Widening
Descp: SR 1461CLOUD SPGS RD FM \75 NORTH TO SR
31US41 Lanes: Exisl. 2
Prop. 4
Length: 0.51
TlP#: STP-98(3)
Phase PE ROW CST
Fund STP Local STP
Phase Fund PE STP CST STP
Phase Fund
PE
STP
ROW Local
CST STP
Phase Fund CST STP
Phase Fund PE NHS ROW NHS CST Bond
Phase Fund PE 33E PE STP ROW STP ROW STP CST STP CST STP Phase Fund PE STP ROW STP ROW STP CST STP
Phase Fund PE Bridge ROW Bridge CST Bridge
Phase PE ROW CST
Fund Bridge Bridge Bridge
Phase PE ROW CST
Fund STP STP STP
Phase Fund PE 061 ROW STP CST STP
Year Underway
LOCL LUMP
Year Underway
2006
Year Underway
LOCL LUMP
Year LUMP
Year Underway
2005 2006
Year Underway Underway
2005 2005 After 2007 After 2007 Year Underway Underway Underway LUMP Year Underway 2006 After 2007
Year Underway
2006 After 2007
Year 2006 After 2007 After 2007
Year Underway
2005 2006
Federal $0
$215.100
Federal $3.260.000
State $0
$23.900
State $815.000
Federal
$0 $380.700
Federal $85,600
State
$0 $42,300
State $0
Federal
$450.400 $0
State
$112,600 $8,042,362
Federal
State
$2,469.600 $1,700.800
$617.400 $425,200
Federal
State
$401.400 Federal $108,000
$44,600 State $27,000
Federal $12,000
State $3.000
Federal $416.000
State $104,000
Federal
$1,273.600 $2.777,600
State
$318,400 $694,400
Other $0 $0
Other $0
Total $0
$239.000
Total $4.075.000
Other
$15.300 $0
Other $21,400
Total
$15.300 $423,000
Total $107,000
Other $0 $0
Other
Total $563.000 $8,042,362
Total
$0
$3,087,000
$0
$2,126,000
Other
Total
$0 Other
$0
$446,000 Total $135,000
Other $0
Total $15,000
Other $0
Total $520,000
Other
$0 $0
Total
$1,592.000 $3,472.000
Page 57 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Catoosa
Project: 642220-
Type Work.- Widening
Descp: SR 1461CLQUO SPR RD FM SR 1/US 27 EAST TO
LAKEVIEW RateR 553
Lanes: exist. 2 Prop. 4
Length: 2_20
TlP#: STP9S(4)
Project 641140-
Type Work; W~Il\llg
Descp: SR 3!US 41 FM SR 151 NORTHWESTLV TO SR 146
Lanes: Exist. 2 Prop. 4
Length" 7.21 TlP#: S.Tp.98t6j
Proj9Ct: 850430. Type Work: Widening
Descp: SR 3/US 41 FM SOUTH OF HIGHLAND RDfCH 40
TO FRAWLEY ROITENN
Lanes:Exfst. 2 Prop. 4
Length: 1.45
TlP#' STP99-1
Project: 8$0440. Type Work' Widening
DeSCp: SR 146/CLOUD SPGS RD FM LAKEVIEW DR TO
1-75& BRIDGE
Lanes:EXist, 2 Prop. 4
t.ength: 2.34
TlP#: STP99-2
Project: M00271D Type Work: Bridges Descp: 1-75@ 8 lOCATIONS IN CATOOSA DECK REHAB
LUMP SUM PROJECT
L.ength: 0.00 TlPU:
Phase Fund PE STP ROW STP CST STP
Year Underway
2006 After 2007
Federal $6,696,800
State
$1,674,200
Phase funrJ PE STP ROW STP ROW STP ROW STP CST STP Phase Fund PE STP ROW STP CST STP
Year Underway
2006 After 2007 After 2007 After 2007
Yea,
Underway Underway
2005
Federal $9,248,800
State $2.312.200
Fed.,.1
State
$2,922,400
$730,600
Phase Fund PE STP ROW STP ROW Qra CST STP
Phue Fcmd PE 1M CST 1M
Yea'
Underway Underway Underway
2006
Yea'
l,.UMP l,.UMP
Fed.,.1
State
57,520,000
Federal $225,000 12,250,000
$1.680,000
State $25,000 $250,000
Other $0
Total $8,371.000
Other $0
Tota'
$11,561,000
Other
ro~1
$0 Other
$3,653,000 Toto'
$0
0 ....$0 $0
$9,400,000
Toto' $250,000 $2,500,000
Page 58 of 300
STATE TRANSPORTATlON IMPROVEMENT PROGRAM
2a!2QQ5
Charlum
Project: (1002110 Type Work Rephu:e Bridg@
Descp: cR 3@ SPARKMANCREEK 11 MI SOUTH OF ST.
G~ORGE
Lenglh: 0.40
TlP#:
Phase Furtd PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2005
Fedvr.J1
$0 $504,000
State
$0 $126,000
Other
$7,000 $0
Totlll
$7.000 $630,000
Project: 0008531 Type Work: Streetscaoes
~
Descp: DOWNTOWN CENTER CITY OF FOLKSTON
PHASE"
Length: 0.00
~
LUMP SuM PROJECT
-
TIP#:
Phase Fund CST STP
Year LUMP
Fede,.., $450,400
State $0
Other $112,600
Tote' $563,000
'-
'-
'-
I...
\-
\...
\...
l. I... l.
\... I... I... I...
l. I...
'-
l. ',-
'....
'-
'c.
Page59 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Chatham
Project: 0000529 Type Work: Lighting
Descp: 1-95@ SR 21/AUGUSTA ROAD INTERCHANGE-
LIGHTING
Length: 0.40
LUMP SUM PROJECT
TIP#:
Project: 0000690 Type Work: Rest Area
Descp: 1-95 RECONSTRUCTION OF THE SOUTH BOUND
WELCOME CENTER
Length: 0.46
TlP#: 2001-H-02
Project: 0001894 Type Work: Intersection Improvement Descp: SR 26/US 80 @ CS 503/3RD STREET
LUMP SUM PROJECT
Length: 0.20 TlP#:
Project: 0002140 Type Work: Widening Descp: SR 307IDEAN FOREST ROAD FM US 17 TO 1-16
Lanes: Exist. 2 Prop. 4
Length: 2.50 TIP#: 2002-H-06
Project: 0002267 Type Work: Miscellaneous Improvement
Descp: SAVANNAH-OGEECHEE CANAL CORRIDOR PHASES 1 & II; DSGN & CON Length: 0.00
LUMP SUM PROJECT
TIP#: 2002-H-30
Project: 0002921 Type Work: New Construction
Descp: HARRY S.TRUMAN PKY FM ABERCORN TO
WHITFIELD - PHASE V Lanes: Exist. 0 Prop. 4
Length: 0.77
TlP#: 90-H-2
Project: 0003371 Type Work: Railroad Crossing
Descp: CR 654ITREMONT RD IN SAVANNAH @ CSX #
641177L
Length: 0.40
LUMP SUM PROJECT
TIP#: 2002-H-25
Project: 0003803 Type Work: Miscellaneous Improvement
Descp: PE FOR SECURITY SYSTEMS ON TALMADGE & SIDNEY LANIER BRIDGES Length: 35.45
LUMP SUM PROJECT
TIP#: BATS-MSL
Project: 0004046 Type Work: Intersection Improvement
Descp: SR 307/DEAN FOREST ROAD AT OLD LOUISVILLE ROADIeS 568 Length: 0.23
LUMP SUM PROJECT
TlP#: 94-H-40
Project: 0004916 Type Work: Lighting
Descp: 1-516 @ BAY STREET INTERCHANGE - LIGHTING UPGRADE Length: 0.40
LUMP SUM PROJECT
TlP#:
Project: 0005822 Type Work: Interchange Descp: 1-95 AT CR 23iPINE BARREN ROAD
Lanes: Exist. 0 Prop. 4
Length: 0.40 TIP#: 2003-H-OI
Phase Fund CST NHS
Phase Fund
PE
1M
ROW 1M
CST 1M
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW Local
CST STP
Phase Fund CST 'STP
Phase Fund PE NHS ROW NHS CST NHS
Phase Fund CST STP
Phase Fund
PE
NHS
Phase Fund PE STP ROW Local CST STP
Phase Fund CST NHS
Phase Fund PE NHS ROW H170 ROW NHS CST NHS
Year LUMP
Year Underway
2005 2006
Year Underway
LUMP LUMP
Year Underway
LOCL 2007
Year LUMP
Year Underway
2005 After 2007
Year LUMP
Year LUMP
Year Underway
LOCL LUMP
Year LUMP
Year Underway
2005 After 2007 After 2007
Federal $135,200
Federal $152,100 $8,803,800 Federal
$11,700 $149,400 Federal
$0 $4,000,000
Federal $200,000
Federal $11,200,000
Federal $100,000
Federal $48,000
Federal $0
$214,200 Federal $144,000
Federal $750,000
Slate $33,800
Slate $16,900
$0 Slale
$1,300 $16,600 State
$0 $1,000,000
State $0
State $2,800,000
State $0
State $12,000
State $0
$23,800 State $36,000
State $0
Other $176,000
Other $0
$978,200 Olher $0 $0 Other $0 $0 Other $50,000
Other $0
Other $0
Other $0
Other $45,600
$0 Other
$0
Other $0
Total
t'
$345,000
.'Total
$169,000
$9,782,000 Total
$13,000
$166,000
Total
$0 $5,000,000
Total
$250,000
Total
$14,000,000
Total $100,000
Total $60,000
Total
$45,600
$238,000
Total
$180,000
Total
$750,000
Page 60of 300
...'''
STATE TRANSPORTATION IMPROVEMENT PROGRAM za/2QQ5
Chatham
Project: 0006118 Type Work: Railroad Crossing Descp: CR 11/BIG HILL ROAD@ NS #734148K
LUMP SUM PROJECT
Length: 0.40 TlP#:
Project: 0006256 Type Work: Interchange Descp: 1-16/1-516INTERCHANGE
Length: 0.40 TlP#: 2003-H-08
Project: 0006298 Type Work: Guardrail
Descp: 1-95 @SEV LOCS GUARDRAIL REPLACEMENT IN CAMDENIBRYANICHATHAM Length: 20.02
LUMP SUM PROJECT
TIP#:
Project: 0006328 Type Work: New Construction
Descp: BRAMPTON ROAD CONNECTOR FM FOUNDATION
DR TO SR 25/SR21/US80
Lanes: Exist. 0 Prop. 4
Length: 0.00
TlP#:
Project: 0006456 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN
BRY AN/CHATHAM
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006464 Type Work: Lighting Descp: 1-16 @ 1-95 HIGHMAST INTERCHANGE - LIGHTING
LUMP SUM PROJECT
Length: 0.40 TIP#:
Project: 0006485 Type Work: Railroad Crossing Descp: CR 13/WHEATHILL ROAD @ CSX #632475M
LUMP SUM PROJECT
Length: 0.40 TIP#:
Project: 0006486 Type Work: Railroad Crossing Descp: CS 589/HAWKINSVILLE ROAD @ CSX #635110R
LUMP SUM PROJECT
Length: 0.40 TIP#:
Project: 0006487 Type Work: Railroad Crossing Descp: CR 13/WHEATHILL ROAD @ CSX #635109W
LUMP SUM PROJECT
Length: 0.40 TIP#:
Project: 0006532 Type Work: Historic Facilities
Descp: TYBEE ISLAND LIGHT STATION/ASST KEEPER'S
COTIAGE - PHASE II
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006533 Type Work: Sidewalks
Descp: SR 26IUS 80 CURB CUTS & SOLOMON AVE BIKE
LANES
Length: 0.00
LUMP SUM PROJECT
TIP#:
Phase Fund CST STP
Year LUMP
Federal $150,000
State $0
Phase Fund
PE
4260
PE
1M
CST 1M
Year Underway
2005 After 2007
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $5,850,000
Federal $292,500
State $650,000
State $32,500
Phase Fund
PE
Local
PE
STP
ROW STP
CST STP
Phase Fund
PE
SfP
CST STP
Year LOCL 2005 After 2007 After 2007
Year Underway
LUMP
Federal $0
$4,000
Federal $336,000
State $0
$1,000
State $84,000
Phase Fund CST NHS
Year LUMP
Federal $195,200
State $48,800
Phase Fund CST STP
Year LUMP
Federal $140,000
State $0
Phase Fund CST STP
Year LUMP
Federal $140,000
State $0
Phase Fund CST STP
Year LUMP
Federal $140,000
State $0
Phase Fund CST STP
Year LUMP
Federal $320,000
State $0
Phase Fund CST STP
Year LUMP
Federal $80,000
State $0
Other $0
Other $0
Other $0
Other $500,000
$0
Other $0
Other $313,000
Other $0
Other $0
Other $0
Other $80,000
Other $20,000
Total $150,000
Total $6,500,000
Total $325,000
Total $500,000
$5,000
Total $420,000
Total $557,000
Total $140,000
Total $140,000
Total $140,000
Total $400,000
Total $100,000
Page 61 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM WaDD5
Chatham
Project: 0006634 Type Work: Sidewalks Descp: POOLER SIDEWALK PROJECT
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006700 Type Work: Unknown
Descp: NORTH-SOUTH CONN FROM SR
119IEFFINGHAMTO SR 30/CHATHAM
Lanes: Exist. 0 Prop. 4
Length: 14.40
TIP#:
Project: 521855. Type Work: Widening
Descp: SR 26/0GEECHEE RD FM 4-LN E/LYNES PKWY TO
VICTORY DRiCS 188 Lanes: Exist. 2 Prop. 4
Length: 1.38
TlP#: 87-H-18B
Project: 522170- Type Work: Widening
Descp: SR 17&26/US 80 FM SR 17 TO CHERRY ST IN
BLOOMINGDALE/CHATHAM
Lanes: Exist. 2 Prop. 4
Length: 2.49
TlP#: 96-H-5
Project: 522610. Type Work: Replace Bridge
Descp: SR 25/HOULIHAN BRIDGE OVER THE SAVANNAH
RIVER
Length: 0.30
TlP#: 94-H-1
Project: 522790. Type Work: New Construction
Descp: JIMMY DELOACH PARKWAY EXTENSION FM 1-16
TO US 80
Lanes: Exist. 0 Prop. 4
Length: 2.70
TlP#: 94-H-02
Project: 522850. Type Work: Widening
Descp: 1-516/LYNES PKWY FM VETERANS PKY (SW BYP)
NORTH TO 1-16
Lanes: Exist. 4 Prop. 6
Length: 2.10
TlP#: 2003H-07
Project: 522855. Type Work: Bridge Rehab
Descp: 1-5161LYNES PKWY SBL & NBL @ SR 25/US 17 IN
SAVANNAH
Lanes: Exist. 4 Prop. 6
Length: 0.23
TlP#:
Project: 522880. Type Work: Widening Descp: SR 21 FM SMITH AVE/CS 590 NORTH TO SR 307
Lanes: Exist. 4 Prop. 6
Length: 1.00 TlP#: 2002-H04
Project: 532570- Type Work: Intersection Improvement Descp: ABERCORN ST @ TIBET AVE
Length: 0.12
TlP#: 93-H-12
Project: 532750. Type Work: Turn Lanes
Descp: SR 204/ABERCORN ST. @ EGRESS
LN/OGLETHORPE MALL IN SAVANNAH
Lanes: Exist. 6 Prop. 7
Length: 0.31
LUMP SUM PROJECT
TlP#: 97-H-OI
Phase Fund CST STP
Year LUMP
Phase Fund CST H170
Year 2005
Phase Fund
PE
STP
ROW Local
CST 0010
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LOCL 2007 2007
Year Underway Underway
2005
Phase Fund
PE
Bridge
CST Bridge
Year 2005 After 2007
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2007
Phase Fund PE NHS CST Bond
Year 2005 2007
Phase Fund CST NHS
Year 2007
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year Underway
2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2005
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
LUMP
Federal $140,000
State $0
Other $35,000
Federal $250,000
State $0
Other $0
Federal
$0 $800,000 $5,768,000 Federal
State
Other
$0 $200,000 $1,442.000
$11,583,000 $0 $0
State
Other
$4.197.600 $1,049,400
Federal $960,000
Stare $240,000
$0
Other $0
Federal
$0 $9,792.800
State
$0 $2,448,200
Federal $334,400
$0
State $83,600 $4,180,000
Other
$0 $0
Other $0 $0
Federal $709,600
State $177,400
Other $0
Federal $174,400
State $43.600
Other $0
Federal
State
Other
$768,000 Federal
$192,000 State
$0 Other
$1.075.500
$119.500
$0
Total
$175,000
Total $250,000
Total $11,583,000 $1.000.000
$7.210,000
Total $5,247.000 Total
$1.200,000
'.Total $0
$12.241,000
Total
$418,000
'.$4,180.000
Total
$887.000
Total
$218,000
Total
$960,000 Total
$1.195.000
Page 62 01300
('...e..'''',
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2QQ5
Chatham
Project: 532760- Type Work: Turn Lanes
Descp: SR 204/ABERCORN ST. @ DERENNE AVE IN
SAVANNAH Lanes: Exist. 5 Prop. 6
Lenglh: 0.20
LUMP SUM PROJECT
TIP#: 97-H-02
Project: 532770- Type Work: Turn Lanes
Descp: SR 204/ABERCORN ST. @ APACHE AVE IN
SAVANNAH Lanes: Exist. 6 Prop. 7
Length: 0.47
LUMP SUM PROJECT
TlP#: 97-H-03
Project: 532780- Type Work: Turn Lanes
Descp: SR 204/ABERCORN ST. @ LARGO DRIVE IN
SAVANNAH Lanes: Exist. 6 Prop. 7
Length: 0.55
LUMP SUM PROJECT
TIP#: 97-H-04
Project: 533200- Type Work: Replace Bridge Descp: SR 204/ABERCORN EXTENSION @ HARMON
CANAL W OF WHITE BLUFF Length: 0.20
TIP#: 2000-H-14
Project: 533205- Type Work: Replace Bridge Descp: CR 302lMONTGOMERY CROSS RD @ CASEY
CANAL 1 MI E OF SR 204 Length: 0.22
TIP#: 2000-H-J5
Project: 550560- Type Work: Widening
Descp: SR 204 SPIWHITFIELD AVE FM OLD WHITFIELD
TO FERGUSON AVE/SAV
Lanes: Exist. 2 Prop. 4
Length: 1.90
TlP#: 87-H-39
Project: MOO0947 Type Work: Miscellaneous Improvement Descp: SR 405/1-95 SAVANNAH WELCOME CENTER
LUMP SUM PROJECT
Length: 0.00 TIP#: 2002-H-07
Project: M002373 Type Work: Bridges
Descp: 1-16SPUR @ TALMADGE BRIDGE - BRIDGE
REHABILITATION
Length: 0.99
LUMP SUM PROJECT
TIP#:
Project: M002383 Type Work: Bridge Painting Descp: PROPOSED BRIDGE PAINTING AT SEVERAL
LOCATIONS IN CHATHAM CO Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: TOO0668 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR SAVANNAH
Length: 0.00 TlP#:
Project: TOO0669 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR SAVANNAH
Length: 0.00 TIP#:
Phase PE ROW CST
Fund STP STP STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase PE ROW CST
Fund Bridge Bridge Bridge
Phase PE ROW CST
Fund Bridge Local Bridge
Phase Fund
PE
STP
ROW STP
ROW STP
CST STP
Phase Fund
PE
1M
Phase Fund CST 1M
Phase Fund CST 1M
Phase Fund CST Transit
Phase Fund CST Transit
Year Underway Underway
LUMP
Year Underway Underway
LUMP
Year Underway Underway
LUMP
Year Underway
2005 2007
Year Underway
LOCL 2006
Year Underway
2005 2006 2007 Year LUMP
Year LUMP
Year LUMP
Year 2005
Year 2005
Federal
State
$594,000 Federal
$66,000 State
$657,000 Federal
$73,000 State
$1,389,600
$154,400
Federal
$12,000 $600,000
State
$3,000 $150,000
Federal
$0 $541,600
State
$0 $135,400
Federal
$567,200 $1,353,600 $6,936,800
Federal $450,000
State
$141,800 $338,400 $1,734,200
State $50,000
Federal $450,000
State $50,000
Federal $158,400
State $17,600
Federal $1,240,273
State $155,034
Federal $5,893,559
State $736,695
Other
$0 Other
$0 Other
$0 Other
$0 $0 Other $181,000 $0 Other $0 $0 $0 Other $0
Other $0
Other $0
Other $155,034
Other $736,695
Total
$660,000 Total
$730,000 Total
$1,544,000 Total $15,000 $750,000 Total $181,000 $677,000 Total $709,000
$1,692,000 $8,671,000
Total $500,000
Total $500,000
Total $176,000
Total $1,550,341
Total $7,366,949
Page 63 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Chatham
Project: TOO0670 Type Work: Transit Projects Oescp: FY 2005 SECTION 5310 CAPITAL FOR SAVANNAH
Lenglh: 0.00 TlP#:
Project: TOO0675 Type Work: Transit Projects Oescp: FY 2005 SAVANNAH SECTION 3037 OPERATING
Length: 0.00 TIP#:
Project: TOO0923 Type Work: Transit Projects Oescp: FY 2006 SECTION 5309 CAPITAL FOR SAVANNAH
Lenglh: 0.00 TIP#:
Project: TOO0927 Type Work: Transit Projects
Oescp: FY 2006 SECTION 5307 OPERATING FOR
SAVANNAH
Length: 0.00
TlP#:
Project: TOO0928 Type Work: Transit Projects Oescp: FY 2006 SECTION 5307 CAPITAL FOR SAVANNAH
Length: 0.00 TlP#:
Project: TOO0929 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR SAVANNAH
Length: 0.00 TlP#:
Project: TOO0942 Type Work: Transit Projects
Oescp: FY 2006 SAVANNAH SECTION 3037 ACCESS TO
JOBS
Length: 0.00
TIP#:
Project: T001164 Type Work: Transit Projects
Oescp: FY 2005 SECTION 5307 OPERATING FOR
SAVANNAH
Lenglh: 0.00
TIP#:
Project: T001246 Type Work: Transit Projects Oescp: FY 2007 SECTION 5307 OPERATING FOR
SAVANNAH Lenglh: 0.00
TIP#:
Project: T001247 Type Work: Transit Projects Oescp: FY 2007 SECTION 5307 CAPITAL FOR SAVANNAH
Length: 0.00 TIP#:
Project: TOO1248 Type Work: Transit Projects Oescp: FY 2007 SECTION 5309 CAPITAL FOR SAVANNAH
Length: 0.00 TIP#:
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Federal $82,190
State $20,547
Other $0
Federal $1,824,225
State $0
Other $9,068.602
Federal $3,920,000
State $490,000
Other $490,000
Federal $1,878,952
State
Other
$0 $9,340,667
Federal $1,140,000
State $142,500
Other $142,500
Federal $86,298
State $21,575
Other $0
Federal $750,000
State $0
Other $750,000
Federal $1,878,952
State
Other
$0 $9,013,875
Federal $1,935,321
State
Other
$0 $9,620,879
Federal $1,240,000
State $155,000
Other $155,000
Federal $3,440,000
State $430,000
Other $430,000
Total
$102,737
Total
$10,892,827 Total
$4,900,000
Total $11,219,619
Total
$1,425,000 Total $107,873
Total
$1,500,000 Total
$10,892,827 Total
$11,556,200
Total $1,550,000 Total $4,300,000 Page 64 of 300
'I.....'''
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2005
Chatham
Project: T001249 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR SAVANNAH
Length: 0,00 TIP#:
Project: T001251 Type Work: Transit Projects Descp: FY 2007 SAVANNAH SECTION 3037 ACCESS TO
JOBS Length: 0,00 TlP#:
Project: T001284 Type Work: Transit Projects Descp: Chatham Area Transit Buses and Bus Facilities
Length: 0,00 TlP#:
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2005
Federal $90,614
State $22,653
Other $0
Federal $1.000.000
State $0
Other $1,000,000
Federal $5,893,559
State $589,356
Other $589,356
Total $113,267
Total $2,000,000
Total $7,072.271
.,
Page 65 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I2005
Chattahoochee
Project: 0001368 Type Work: Replace Bridge
Descp: CR 58 @ GEORGIA SOUTHWESTERN RAILROAD
4.6 MI E OF CUSSETA
Length: 0.30
TlP#:
Project: 0001893 Type Work: Turn Lanes
Descp: SR 520 FROM 1185/MUSCOGEE TO SR 26/MP
8.51/CHATTAHOOCHEE Lanes: Exist. 4 Prop. 5
Length: 10.28
LUMP SUM PROJECT
TlP#: Safe Lump
Project: 0002408 Type Work: Guardrail
Descp: LINDSAY CREEK PKWY FROM 1ST DIVISION RD/CHATT TO 1-185/MUSCG Length: 0.00
LUMP SUM PROJECT
TlP#: Safe Lump
Project: 0006258 Type Work: Intersection Improvement Descp: US 280/US 27 INTERSECTION IN CUSSETA
Length: 0.40 TlP#:
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2007
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST 064
Year 2005
Federal $0
$759,200 Federal $1.991.700
Federal $819,000
Federal $200,000
State $0
$189.800 State $221.300
State $91.000
State $50.000
Other $12.500
$0 Other
$0
Other $0
Other $0
Total
$12,500
$949.000 Total
$2.213.000
Total
$910.000 Total
$250.000
.' Page66of300
...."''',
.',
t,
.'t
t)
..''f' ..''',',
t,
..',t'. ,
STATE TRANSPORTATION IMPROVEMENT PROGRAM za12QQ5
Chattooga
Project: 0000677 Type Work: Replace Bridge
Descp: CR 87/PEACH ORCHARD ROAD @ ALPINE CREEK
1 MI SE OF MENLO Lanes: Exist. 0 Prop. 1
Length: 0.20
TlP#:
Project: 0000679 Type Work: Replace Bridge Descp: CR 32210LD HIGHWAY 337 @ CHELSEA CREEK
3.2 MI NE OF MENLO Length: 0.21
tte
Project: 0000846 Type Work: Replace Bridge Descp: CR 325/FH 12/HAMMOND GAP ROAD @ RUFF
CREEK NW OF SUBLIGNA Length: 0.20
TlP#:
Project: 0003081 Type Work: Replace Bridge Descp: CR 321ITALIAFERRO SPRINGS@ CHATTOOGA
RIVER 1 MI S OF LYERL Y Length: 0.19
TIP#:
Project: 0005530 Type Work: Replace Bridge Descp: SR 48 @ EAST FORK LITTLE RIVER
Length: 0.20 TlP#:
Project: 00066:z1 Type Work: Historic Facilities Descp: SUMMERVILLE DEPOT RENOVATION
LUMP SUM PROJECT
Length: 0.00 T/P#:
Project: 621082. Type Work: Widening
Descp: SR 1IUS27/SUMMERV'LE BYP FM CR 329 TO N OF
CR325 @ SR 1/US27 Lanes: Ex/st. 2 Prop. 4
Length: 8.00
TlP#:
Project: 621610. Type Work: Widening
Descp: SR 1IUS 27 FM HARRELL ST/CR 331 IN TRION TO
SR 151/WALKER CO
Lanes: Exist. 2 Prop. 4
Length: 4.72
TIP#:
Project: 642470 Type Work: Replace Bridge Descp: CR 3321BACK BERRYTON ROAD @ RACCOON
CREEK CENTER OF BERRYTON Length: 0.22
TlP#:
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2007
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2007
Phase PE ROW CST
Fund Forest Hw Local Forest Hw
Year Underway
LOCL 2005
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2007
Phase Fund PE Bridge ROW Bridge CST Bridge
Year 2005 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Federal $0
$320.000
Federal $0
$320,000
Federal $0
$729,000
Federal $0
$676,800
Federal $36,000
State $0 $0
State $0 $0
State $0 $0
State $0
$169,200
State $9,000
Federal $200,000
State $0
Phase Fund
PE
State
ROW Bond
ROW Bond
CST Bond
Phase Fund PE State ROW State CST Bond
Year Underway
2006 2007 After 2007
Year Underway Underway
2005
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2007
Federal
$0 $0
State
$4,885,000 $5,000,000
Federal
State
$0 $16,500,000
Federal
$0 $722,400
State
$0 $0
Other $16,000 $80,000
Other $10,000 $80,000
Other $0 $0
Other $10,000
$0
Other $0
Other $50,000
Other $0 $0
Other
$0
Other $10,000 $180,600
Total $16.000 $400.000
Total $10,000 $400,000
Total $0
$729,000
Total $10.000 $846,000
Total $45,000
Total $250,000
Total $4,885,000 $5,000,000
Total
$16,500,000
Total $10,000 $903,000
Page 67 of 300
STATE TRANSPORTA TION IMPROVEMENT PROGRAM 217/2005
Cherokee
Pro~t: 0000418 Type WOTk.- Intersection Improvement Descp: OLD SR 5/CR 1061 @ HICKORY RD & HOLLY Sf IN
HOl.LY SPRINGS Length" 0.35
TlP#: CH-20S
Project: 0002837 Type Work: Widening
Descp: SIXES ROAD/eR 779 FROM 1-575 TO OLD SR 51CR
1061 Lanes: Exist. 2
ProP, 4
Length: 0.32
TlPII: CH-190
Project: 0002846 Type Work: Widening Descp: HICKORY FLAT ROAD IN CANTON(LCI PROJECT)
LUMP SUM PROJECT
Length: 3.54 T1P#: CH-AR-240
P~ct: 0002147 TYPfI Work; Widening
Descp: WALESKA STREET FM MAIN/NORTH 5T TO SR 5
BUS (LCI PROJECT)
l.ength: 0.49
LUMPSUM PROJECT
TlP#: CH~AR-24\
Project: (1002141 Typ~ Worn.- Widening
Descp: RAILROAD STREET TRAIL IN CANTON PHASE 1
(Lei PROJECT)
l.ength: 0.00
LUMP SUM PROJECT
TlP#: CH-AR-242A
Project: 0002112 Type Work; Widening
Oesc:p: SR 20 FROM SR 369JCHEROKEE TO SR
371/FORSYTH Lanes: Exist. 2 Prop. 4
Length: 6.37
TlP#: FT-061
Project: 0003111 Type Work.- Widening Descp: SR 20 FROM 1-575 TO SR 369
Lanes: Exist. 2 Prop. 4
Length: 8.64 TIP#: CH-020B
Projec/: 0003771 Type WoriI.- Lighting
Descp: EAST MAIN STREET PEDESTRAIN LIGHTING IN
CANTON Length: 1.35
TIP#: CH-216
Project: 8003&40 Type Werle Intersection Improvemem Descp: SR 5 BUIHOWELL BRIDGE RO AT BALL GROUND
HWY & OLD CANTON RD Length: 0.27
LUMP SUM PROJECT
TlP#: AR-118
Project: 80044" Type Worle BicyclefPed. Facility Descp: MAIN STREET FM WOODSTOCK LIBRARY TO
CHEROKEE CO SOUTH ANN~X Length: 0.33
TlP#: CHAR-BPOI
Project: 000441$ Ty"P~ Work: Bicycll:!/Ped. Facility
Descp: MARIETTA ROAD FM MARIETTA HIGHWAY TO
HICKORY FLAT ROAD
Length: 1.19
Tlp# CH-AR-BPOI
Phase Fund PE STP ROW Local CST STP
Y. .,
Underway LOCL
2006
Phase Fund
PE local ROW Local CST STP
Y. .,
LOCL LOCL
2005
Phase FUnd PE STP CST STP
Y. .,
Underway LUMP
Phase Fund PE STP CST STP
Y. .,
Underway LUMP
Phase Fund PE Local ROW Local CST STP
Ye" LOCL
LOCL
LUMP
Phase PE ROW CST
FlJnd STP STP STP
Y. .,
Underway After 2007 After 2007
Phase Fund PE STP ROW STP ROW STP CST STP
Phase Funcl PE Local CST STP
Y. .,
2007 After 2007 After 2007 After 2007
Y..,
LOCL 2005
Phase Fund ROW Local CST STP
Y..,
LOCL LUMP
Phase Fund PE Local CST CMAQ
Y. .,
lOCL 2005
Phase Fund PE Local ROW Local CST CMAQ
Year LQCL LOCL 2005
Federal $0
$160,000
Feci.,,,,
$0 $0 $708,000
FedfN7ll $960,000
Federal 51,232,000
Federal $0 $0
$1,600,000
Federal
Federal $1,920,000
Federal $0
$400,000
Federal $0
$601,639
Fedel7JI $0
$176,000
Federal $0 $0
$1,200,000
State
$0 $0
Oth.r
$253,750 $40,000
State $0 $0
$177,000
Other
$1CN),OOO $200,000
$0
State $0
Other $240,000
State $0
Orher $308,000
State $0 $0 $0
Other $100,000
$0 5400.000
State
Other
Sl.te $480.000
Other $0
St.te $0 $0
Other $20,000 $100,000
State $0
$66,&49
Other $48,700
$0
State $0 $0
Other $30,000 $44,000
Sfare $0 $0 $0
Other $100,000 $100,000 $300.000
Total $253.150 5200.000
Total 5100,000 $200.000 S885.000
To,.,
$1,200,000
Total
$1,540,000
To,.,
$100.000 $0
$2,000.000
TOIO'
Total $2,400,000
rOlO'
$20,000 $500,000
To,., $48,700
$668,""88
Total $30,000 $220,000
Total
$100,000 $100,000 $1,500,000
Page 68 of 300
STATE TRANSPORTA nON IMPROVEMENT PROGRAM 2012005
Cherokee
Proj9ct: 000"" Type Work: Bicycle/Ped, Facility Descp: TOWNE LAKE PARKWAY FROM MAIN STREET TO
1-575 Length' 0.76
TIP#" CII-ARBPOl
Project: 0004417 Type Worx; Bicycle/Pad Facility Descp: WOODSTOCK GREENWAY
Lenglh" 0.00
TlP#: C'H AR oro)
Ph.,. Fund
PE Local
CST CM,I\Q
Year LOCL 2005
Phase Fund PE local CST CMAQ
vu,
LOCL 2005
Fodefill $0
$408,000
Slat. $0 $0
Ome,
$90.000 $102,000
Total $90,000 $510,000
HH:te('(l1 $0
$1,360.000
Stafe SO $0
OUler $300,000 $340,000
Total $300.000 $1,700,000
Project: 0004491 Type Work: Bicycle/Pad. facility
Phase Fund
Year
Federal
Stilte
Other
ToYI
Descp: PUTNAM FORD ROAD FROM BASCOMBCARMEl
ROW Local
LOCL
$0
$0
$50,000
$50,000
.~
ROAD TO EAGLE DRIVE
CST CMAQ
2005
$187,600
SO
$49,400
$247,000
Length: 1.08
"-
TlP#: C'H-ARor04
"-
~
I.-
L
l.
L
L l-
l. l. l. ll. l. \.. l. l. l. L l-
C
Project: oo~tt TypeWor/(: BicycleIPed. Facility Descp: WOODSTOCK RD FM OAK GROVE SCHOOL RD TO
OAK GROVE ELEMENTARY Length: 0.25
TIP#.: CH-AR-Bro4
Project: 000$970 Type Work: Roadway Project
Oescp: SR 3721BALLGROUND RD FM CANTON HWY TO
CUMMINGHWY
Length 9.85
n"" CH-165
Project: 00g8288 Type Work: Barriers Descp: 1-575 FM TOWN LAKE PKWY TO PICKENS
CO-CABLE MEDIAN BARRIERS Length: 21.98
LUMP SUM PROJECT
TlP#:
Project: 00083304- Typ~ Work: AlMs/ITS
Descp: ATM$/1-75 N COMMUNICISURVEILANCE FM WADE
GREEN RD TO SR 92
Lellgth: 4.28
TIP#.: AR-432
Project: 00"577 Type Work' Multi-use Trail {)eScp: UTILE RIVER GREENWAY & TRAIL PROJECT
LUMPSUM PROJECT
Length: 0.00 TlP#:
Project 0008584 Type WorK: Streetscapes Descp: BALL GROUND DOWNTOWN STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project OOl)$Sl.S Type Work: sweeteeeces
Descp: NELSON PEDESTRIAN ENHANCEMENTS
LUMP SUM PROJECT
Length: 0.00 TlP#'
Phase Fund PE Local ROW Local CST CMAQ
Year LOCL LOCL 2005
Phase Fund PE S7P ROW 5TP CS7 STP
Vw 2007 After 2007 After 2007
Phase Fund PE STP CST STP
Y. . r
Underway LUMP
Feder'"
SO So
$72,000
Fede,..1 $235.200
FGdefiJl $1,566,5100
Srare SO SO $0
Srare 558.800
srare $174,100
O"er
$a,000 $20,000 $18,000
Orher $0
Orher SO
Phase Fund PE NHS CST NHS
V. ., 2005 2006
Feder.1 $120,000 $4,000,000
S[a(e $30.000 $1,000.000
Orher
So SO
Phase Fund CST STP
Vw LUMP
Feder.! $500,000
Srare $0
0 ..., 5125,000
Phase Fund CST STP
V.., LUMP
Fede,..! $520.000
Stare
SO
O"er
$130,000
Phase Fund CST STP
Y. .,
LUMP
F:eder.t $400,000
sere $0
Orher $100,000
Total
se.ooo
$20,000 $90,000
Total $294,000
Total $1,741.000
Toto' $150,000 $5,000,000
Total $625,000
Total $650,000
To,., $500.000
L
Project: 000e118 Ty~ Work: Intersection Improvemenl
Phase Fund
Year
Federal
State
Other
Totl'
Dasc/J: CS 678/MARIETTA ROAD@CS681/HICKORYFLAT
PE Local
LOCL
$0
$0
$60,000
$60,000
L
ROAD
Length: 0.40
CST STP
2005
$272,000
$0
$BB,OOO
$340,000
\...
TIP#' C'H-:!06
'--
"-
Page 69 or 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Cherokee
Project: 0006859 Type Work: Transit Facilities Descp: CITY OF CANTON INTERMODAL TRANSFER
STATION AND PARK & RIDE Length: 0.00
TlP#: CHAR-261
Project: 810740. Type Work: Interchange Descp: 1-75 @ SR 92
Length: 0.25 TlP#: CHAR-I08
Project: 611250- Type Work: Auxiliary Lanes Descp: 1-575 AUXILIARY LANES BETWEEN SR 92 AND
TOWNE LAKE PARKWAY Length: 0.89
TlP#: CH-AR-229
Project: 811260. Type Work: Auxiliary Lanes
Descp: 1-575 AUXILIARY LANES BETWEEN SR 20 AND SR
5 BUSINESS
Length: 0.36
TIP#: CH-AR-230
Project: 811270- Type Work: Interchange Descp: 1-575 AT SR 20 -INTERCHANGE
RECONSTRUCTION Length: 0.28
TlP#: CH-AR-23I
Project: 820920. Type Work: Widening
Descp: SR 92 FM W OF WADE GREEN ROAD EASTERLY
TO CHEROKEE TRAIL
Lanes: Exist. 2 Prop. 4
Length: 4.70
TlP#: CH-003
Project: 820940. Type Work: Widening Descp: SR 92 FM 175 TO WADE GREEN ROAD
Lanes: Exist. 2 Prop. 4
Length: 4.50 TIP#: CHOO4
Project: 830975. Type Work: Replace Bridge
Descp: CR 770/BELLS FERRY RD FM NO VICTORIA TO .2
MI N/LITILE RV
Lanes: Exist. 2 Prop. 4
Length: 0.63
TlP#: CHOlOB
Project: 832790- Type Work: Passing Lanes
Descp: SR 20: 3 TRUCK CLIMBING LANES AND INT IMP
FM 1-575 TO CR 238 Lanes: Exist. 2 Prop. 3
Length: 4.90
TlP#: CH-020Al
Project: 832840. Type Work: Turn Lanes
Descp: SR 140 FM ARNOLD MILL RD/CR 777 TO
MOUNTAIN RD/CR 311 Lanes: Exist. 2 Prop. 3
Length: 1.70
TlP#: CH140F
Project: 832850. Type Work: Intersection Improvement
Descp: SR 140@ HICKORY ROAD/CR 778 & BATESVILLE
ROAD/CR298
Length: 0.53
TlP#: CH-140EI
Phase Fund
PE
Local
ROW STP
CST STP
Year LOCL 2006 2007
Phase Fund PE NHS ROW NHS CST NHS
Year Underway Underway
2005
Phase Fund
PE
NHS
CST NHS
Year Underway
2005
Federal $0
$240,000 $340,000
Federal
State $0 $0 $0
State
$4.680,400 $1,170,100
Federal $1,621,070
State $405,267
Phase Fund
PE
NHS
CST NHS
Year Underway
2005
Federal $478,385
State $119,596
Phase Fund PE NHS ROW NHS CST NHS
Year Underway
2005 2006
Federal
$1,531,200 $748,800
State
$382,800 $187.200
Phase PE ROW CST
Fund NHS NHS NHS
Year Underway Underway
2005
Federal
State
$9,315,200 $2,328,800
Phase Fund
PE
NHS
ROW NHS
ROW NHS
CST NHS
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway Underway
2006 2007
Year Underway
LOCL 2006
Federal
$12,173,600 $12,580,800
Federal
$0 $5,052,000
State
$3,043,400 $3,145,200
State $0
$1,263,000
Phase Fund
PE
STP
ROW STP
ROW STP
CST STP
Phase Fund
PE
051
ROW STP
CST STP
Year Underway Underway
2006 After 2007
Year Underway
2005 2006
Federal
State
$5,895,200 $1,473,800
Federal
$0 $1,301,600
State
$1,302,000 $325,400
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 After 2007
Federal $20,800
State $5,200
Other $75,000 $60,000 $85,000 Other
$0 Other
$0
Other $0
Other $0 $0
Other
$0 Other
$0 $0 Other $0 $0 Other
$0 Other
$0 $0 Other $574,000
Total $75,000
.\
$300,000 $425,000 Total
$5,850,500 Total
$2,026,337
Total
...''111''
$597,981 Total
$1,914,000 $936,000
" Total $11,644,000
Total $15,217,000
$15,726,000
Total $0
$6,315,000
.-j'Total
..''$7,369,000
Total
$1,302,000
$1,627.000
.'Total
$600,000
Page 70of300
,J.-'
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM Za12QQ5
Cherokee
Project: 632855- Type Work: Turn Lanes
Oescp: SR 140 AT MAULDIN ROAD/CR 323 AND UNIVETER
ROAD/CR 309 Lanes: Exist. 2 Prop. 3
Length: 0.40
TIP#: CH-140DI
Project: 642400- Type Work: Replace Bridge
Descp: SR 372 @ ETOWAH RIVER 2.3 MI SE OF BALL
GROUND
Length: 0.76
TIP#: CH-204
Project: 662650. Type Work: Intersection Improvement Descp: SR 20 @ SR 108; WHITE ROAD/CR 17 & MT.
CARMEL LANE/CR 13 Length: 0.20
TIP#: CH-209
Project: 671951- Type Work: Replace Bridge Descp: CR 107/HOWELL BRIDGE RD @ SHARP MTN
CREEK SW OF BALL GROUND Length: 0.13
TlP#: CH-199
Project: 714090- Type Work: ATMS/ITS
Descp: ATMS: 1-575 COMM/SURVEILLANCE FM 1-75/COBB
TO SR 92JCHEROKEE
Length: 8.58
TlP#: AR-341
Project: 721308- Type Work: Replace Bridge Descp: SR 140/HOUZE RD OVER LITTLE RIVER @
FULTON/CHEROKEE CO LINE Length: 0.50
TlP#: FN-232B
Project: M002965 Type Work: Guardrail
Descp: 1-75 FROM SR 5 CONNECTOR TO CR 633/RED TOP
MOUNTAIN ROAD
Length: 24.53
TIP#: AR-126G
Project: TOO0591 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR CHEROKEE
COUNTY
Length: 0.00
TlP#: AR-CH-5310
Project: TOO0988 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR CHEROKEE
COUNTY
Length: 0.00
TlP#: AR-CH-5310
Project: TOO1271 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR CHEROKEE
COUNTY
Length: 0.00
TIP#: AR-CH-5310
Phase PE ROW CST
Fund STP STP STP
Year Underway Underway
2006
Federal $240,000
State $60,000
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 After 2007
Federal $64,000
State $16,000
Phase Fund
PE
STP
ROW STP
CST STP
Year 2006 After 2007 After 2007
Federal $8,000
State $2,000
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2006
Federal
$0 $1,089,000
State
$0 $272,000
Phase PE PE CST
Fund NHS NHS NHS
Year Underway
2005 2006
Federal
$120,000 $10,440,800
State
$30,000 $2,610,200
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006
Federal
$80,000 $2,192,000
State
$20,000 $548,000
Phase Fund
PE
1M
CST 1M
Year 2005 2005
Federal $1,800,000 $38,400,000
State $200,000 $9,600,000
Phase Fund CST Transit
Year 2005
Federal $22,881
State $5,720
Phase Fund CST Transit
Year 2006
Federal $24,025
State $6,006
Phase Fund CST Transit
Year 2007
Federal $25,226
State $6,307
Other
$0 Other
$0
Other $0
Other $400,000
$0 Other
$0 $0 Other $0 $0 Other $0 $0
Other $0
Other $0
Other $0
Total
$300,000 Total $80,000
Total $10,000
Total $400,000 $1,361,000 Total $150,000 $13,051,000 Total $100,000 $2,740,000 Total $2,000,000 $48,000,000
Total $28,601
Total $30,031
Total $31,533
Page 71 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM Za/2QQ5
Clarke
Project: 0001583 Type Work: Turn Lanes
Descp: SR 8/US 29 MED TN LNS FM NE OF ATHENS TO
OLD SR 106/MADISON
Length: 3.66
TIP#: R-75
Project: 0003374 Type Work: Railroad Crossing
Descp: CR 38/RIVERBEND RD IN WHITEHALL @ NS #
733078U
Lenglh: 0.00
LUMP SUM PROJECT
TlP#: RR-OI16
Project: 0005922 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ 7 LOCS ALONG
SR 10lUS 78 BUS
Lenglh: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006320 Type Work: Replace Bridge
Descp: CR 481/COLLEGE STATION RD BRIDGE OVER N
OCONEE RIVER EAST
Length: 0.40
TlP#: 8-7
Project: 0006321 Type Work: Replace Bridge
Descp: CR 481/COLLEGE STATION RD BRIDGE OVER N
OCONEE RIVER WEST
Length: 0.40
TIP#: B-7.
Project: 0006635 Type Work: Multi-use Trail Descp: ATHENS RAIL TO TRAIL - PHASE II
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 121970- Type Work: Widening
Descp: CR 600/DANIELSVILLE RD FM 4-LN NEAR CR 109
TO WALKER DRIVE
Lanes: Exist. 2 Prop. 4
Length: 1.10
TIP#: R-34
Project: 122160- Type Work: Widening
Descp: SR 15 ALT/US 129 FM LAVENDER DR/CLARKE TO
SR 330/JACKSON
Lanes: Exist. 2 Prop. 4
Length: 3.71
TIP#: R-33
Project: 122600- Type Work: Intersection Improvement
Descp: SR 10 LOOP/ATHENS PERIMETER AT US
78/LEXINGTON RD
Lanes: EXist. 4 Prop. 6
Length: 0.70
TIP#: R-47
Project: 122850- Type Work: Interchange Descp: SR 10 LOOP/ATHENS PERIMETER AT PETER
ST/CS 306 & OLYMPIC DR Length: 0.75
TIP#: R-35
Project: 122890- Type Work: Interchange Descp: SR 10LP/PAUL BROUN PKWY AT SR 10/ATLANTA
HWY IN ATHENS Length: 0.80
TIP#: R-n
Phase Fund PE STP CST STP
Year Underway
2006
Federal $4.048.000
State $1.012.000
Phase Fund CST STP
Year LUMP
Federal $100.000
State $0
Phase Fund CST STP
Year LUMP
Federal $440.000
State $110.000
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year 2005 2006 After 2007
Federal $80.000 $80.000
Phase Fund PE Bridge ROW Bridge CST Bridge CST STP
Phase Fund CST STP
Year 2005 2006 After 2007 After 2007 .
Year LUMP
Federal $48.000 $80.000
Federal $184.800
State $20.000 $20.000
State $12.000 $20.000
State $0
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2007
Federal
$800.000 $3.480.000
State
$0 $0
Phase Fund PE STP ROW STP CST STP
Year Underway Underway
2005
Phase Fund PE STP ROW STP CST STP
Year Underway
2006 2007
Phase Fund
PE
NHS
ROW STP
CST STP
Year Underway
2006 After 2007
Federal
State
$9.212.000 $2.303.000
Federal
$490,400 $3,205.600
State
$122.600 $801,400
Federal $121.600
State $30,400
Phase Fund
PE
NHS
ROW STP
ROW STP
CST STP
Year Underway Underway
2007 After 2007
Federal $2.184.000
State $546.000
Other $0
Other $0
Other $0
Other $0 $0
Other $0 $0
Other $46.200
Other $200.000 $870.000
Other
$0 Other
$0 $0 Other $0
Other
$0
Total $5.060.000
Total $100.000
Total $550.000
Total $100.000
I $100.000
Total $60.000
$100.000
.'Total
$231.000
Total $1.000.000 $4.350.000
Total
$11.515.000
~
Total
$613.000 $4.007.000
Total
$152.000
Total
$2.730.000
Page 72 of300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2012005
Clarke
Project: 132660. Type Work: Widening
Descp: SR 10/US 78 FM WHIT DAVIS RDICR 166 TO
SMOKEY/CR 26/& OGLETH
Lanes: Exist. 2 Prop. 4
Length: 11.48
TIP#: R-41
Project: 142205. Type Work: Intersection Improvement Descp: WINTERVILLE RDICR 470 AT INDIAN HILLS &
SPRING VALLEY-REALGN Length: 0.35
TlP#: R-54
Project: 142235- Type Work: Intersection Improvement
Descp: HAWTHORNE AVEICR 811 AT OLD WEST BROAD
STICR 938
Length: 0.25
TlP#: R-74
Project: TOO0644 Type Work: Transit Projects Descp: FY 2005 ATHENS SECTION 5307 OPERATING
Length: 0.00 TlP#:
Project: TOO0645 Type Work: Transit Projects Descp: FY 2005 ATHENS SECTION 5307 CAPITAL
Length: 0.00 TlP#:
Project: TOO0646 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR ATHENS
Length: 0.00 TlP#:
Project: TOO0647 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR ATHENS
Length: 0.00 TlP#:
Project: TOO0905 Type Work: Transit Projects Descp: FY 2006 ATHENS SECTION 5307 OPERATING
Length: 0.00 TIP#:
Project: TOO0906 Type Work: Transit Projects Descp: FY 2006 ATHENS SECTION 5307 CAPITAL
Length: 0.00 TIP#:
Project: TOO0907 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR ATHENS
Length: 0.00 TlP#:
Project: TOO0908 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR ATHENS
Length: 0.00 TlP#:
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL 2005
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL 2007
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Federal $5,656,800
State $1,414,200
Other $0
Federal
$0 $800,000
Federal
$0 $400,000
Federal $477,000
State
$0 $0
Other
$0 $200,000
State
$0 $0
Other
$0 $100.000
State $0
Other $3,034.101
Federal $1,270.729
State $158,841
Other $158.841
Federal $400.000
State $50.000
Other $50.000
Federat $22.881
State $5.720
Other $0
Federal $502.000
State $0
Other $3,011,630
Federal $1.308,850
State $163,606
Other $163.606
Federal $400,000
State $50,000
Other $50,000
Federal $24.025
State $6.006
Other $0
Total $7.071.000
Total $0
$1.000.000 Total $0 $500,000 Total
$3.511.101
Total $1.588,411
Total $500.000
Total $28.601
Total $3.513.630
Total $1.636,063
Total $500.000
Total $30.031
Page 73 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 20/2005
Clarke
Project: T001115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rail Phase II
Length: 0.00 TlPII:
Project: T001225 Type Work: Transit Projects Descp: FY 2007 ATHENS SECTION 5307 OPERATING
Length: 0.00 TlPII:
Project: T001226 Type Work: Transit Projects Descp: FY 2007 ATHENS SECTION 5307 CAPITAL
Length: 0.00 TlPII:
Project: T001227 Type Work: Transit Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR ATHENS
Length: 0.00 TlPII:
Project: T001228 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR ATHENS
Length: 0.00 TlPII:
Project: T001279 Type Work: Transit Projects Descp: Athens Multimodal Station
Length: 0.00 TlPII:
Project: T001283 Type Work: Transit Projects Descp: Athens-Clarke County Park & Ride Project
Length: 0.00 TlPII:
Phase Fund
CST HPP
Year 2005
Federat $5,702,000
State $1,425,500
Other $0
Phase Fund
CST Transit
Year 2007
Federal $517,061
State $0
Other $3.101,978
Phase Fund
CST Transit
Year 2007
Federal $1,348,116
State $168.515
Other $168.515
Phase Fund
CST Transit
Year 2007
Federal $400,000
State $50,000
Other $50,000
Phase Fund
CST Transit
Year 2007
Federal $25.226
State $6,307
Other $0
Phase Fund
CST Transit
Year 2005
Federal $1,571.616
State $0
Other $392,904
Phase Fund
CST Transit
Year 2005
Federal $2,701,214
State $0
Other $675,303
Total
$7.127.500
Total $3.619,039 Total $1,685,145 Total $500,000 Total $31.533 Total $1.964.520 Total
$3.376.517 Page 74 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 20/2005
Clay
Project: 0001369 Type Work: Replace Bridge Descp: CR 76 @ DRAG NASTY CREEK 9 MI N OF FORT
GAINES Length: 0.22
TIP#:
Project: 0006527 Type Work: Water Pollution Mitig.
Descp: 3 PARCELS TO MITIGATE PI#422115 & 422220/EARLY &422230/CLAY Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 422230- Type Work: Widening
Descp: SR 1IUS27FM BLUFFTON BYP TO CARNEGIE VILU
RD/CR 153lRANDOLPH Lanes: Exist. 2 Prop. 4
Length: 6.86
TIP#:
Project: T001286 Type Work: Transit Projects
Descp: Regional Transit for Quitman, Clay, Randolph &
Stewart Count
Length: 0.00
TlP#:
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2006
Phase Fund ROW STP
Year LUMP
Federal
$0 $520,000
Federal $1,600,000
State
$0 $130,000
State $400,000
Phase Fund PE State PE State ROW RRBS CST RRBS
Phase Fund CST Transit
Year Underway Underway
2006 2007
Year 2005
Federal
State
$0 $0
Federal $491,330
$5,769,000 $16,025,000
State $0
Other
$10,000 $0
Other $0
Total
$10,000 $650,000
Total $2,000.000
Other
Total
$0 $0
Other $98,266
$5,769,000 $16.025.000
Total $589,596
Page 75 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM Wl2QQ5
Clayton
Project: 0000621 Type Work: Sidewalks Descp: RIVERDALE SIDEWALKS TO SCHOOLS
Length: 0.00 TlP#: CL-AR-BPOO
Project: 0000622 Type Work: Sidewalks
Descp: FOREST PARK SIDEWALKS TO SCHOOLS -
PHASE 1
Length: 9.10
TlP#: CL-AR-BP23
Project: 0000623 Type Work: Sidewalks
Descp: FOREST PARK SIDEWALKS TO SCHOOLS -
PHASE 2
Length: 4.76
TlP#: CL-AR-BP24
Project: 0001759 Type Work: HOV Lanes
Descp: 1-75FROM SR 54 NORTH TO AVIATION BLVD-
FOR HOV LANES Lanes: Exist. 8 Prop. 10
Length: 6.40
TIP#: AR-H-050A
Project: 0001817 Type Work: Railroad Crossing
Descp: AVIATION BLVD/ CR 1516 GRADE SEPARATION AT
NSRR
Length: 1.10
TlP#: AR-510
Project: 0002754 Type Work: ATMS/ITS Descp: ATMS:I-285 SURVEIL FM 1-75/CLAYTON NE THRU
FULTN TO 1-20/DEK Length: 11.45
TIP#: AR-281
Project: 0002849 Type Work: Sidewalks
Descp: TRANSIT-ORIENTED STREETSCAPE IN MORROW
(LCI PROJECT)
Length: 0.00
LUMP SUM PROJECT
TlP#: CL-AR-243
Project: 0003162 Type Work: HOV Lanes
Descp: 1-85 FROM RIVERDALE RD NORTH TO 1-75 FOR
HOVLANES
Lanes: Exist. 6 Prop. 8
Length: 5.86
TlP#: AR-H-150A
Project: 0003167 Type Work: HOV Lanes Descp: 1-75 FM SR 54/CLAYTON TO EAGLES LANDING
PKY/HENRY HOV LANES
Lanes: Exist. 8 Prop. 10
Length: 8.16
TlP#: AR-H-051A
Project: 0004401 Type Work: Widening
Descp: TARA ROAD FROM MCDONOUGH RD TO TARA
BLVD
Lanes: Exist. 2 Prop. 3
Length: 2.87
TlP#: CL-099
Project: 0004402 Type Work: ATMS/ITS Descp: ATMS: CLAYTON COUNTY ATMS ENHANCEMENT
IMPLEMENTATION Length: 0.00
TlP#: CL-237B
Phase Fund
PE
Local
ROW Local
CST CMAO
Year LOCL LOCL 2005
Phase Fund PE STP ROW Local CST STP
Year 2006 LOCL After 2007
Phase Fund
PE
Local
CST STP
Year LOCL 2007
Federal $0 $0
$1,190,400
Federal $0 $0
Federal $0
$800,000
State $0 $0 $0
State $0 $0
State $0 $0
Phase Fund
PE
NHS
ROW Bond
CST NHS
Year 2005 After 2007 After 2007
Federal $5,760,000
State $1,440,000
Phase Fund
PE
STP
ROW STP
CST STP
Year 2006 After 2007 After 2007
Federal $686,400
State $171,600
Phase Fund CST Bond
Year 2005
Federal $0
State $12,758,000
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Federal
$0 $1,024,000
State
$0 $0
Phase Fund
PE
NHS
PE NHS
ROW Bond
CST NHS
Phase Fund
PE
NHS
ROW Bond
CST NHS
Year 2006 After 2007 After 2007 After 2007
Year 2006 After 2007 After 2007
Federal $4,000,000
State $1,000,000
Federal $6,400,000
State $1,600,000
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year Underway
2005 2006
Federal
$0 $0
State
$350,000 $2,500,000
Phase Fund
PE
Bond
CST Bond
Year 2005 2006
Federal $0 $0
State $950,000 $5,400,000
Other $125,000
$75,000 $297,600
Other $188,000
$50,000
Other $100,000 $238,000
Other $0
Other $0
Other $0
Other $0
$256,000
Other $0
Other $0
Other $0 $0
Other $0 $0
Total $125,000
$75,000 $1,488,000
Total $188,000 $50,000
Total $100,000 $1,038,000
Total $7,200,000
Total $858,000
Total $12,758,000
Total $0
$1,280,000 Total
$5,000,000
Total $8,000,000
Total $350,000 $2,500,000 Total $950,000 $5,400,000
Page 76 of 300
.'
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Clayton
Project: 0004445 Type Work: Signals Descp: SR 54/JONESBORO 16 SIGNAL UPGRADES FM
REX RD TO EAST DIXIE Length: 3.47
LUMP SUM PROJECT
TIP#: CL-236
Project: 0004471 Type Work: Parking Areas
Descp: CITY OF MORROW PARKING DECK FY 2004 LCI
PROJECT
Length: 0.00
LUMP SUM PROJECT
TIP#: CL-AR-244
Project: 0004500 Type Work: Bicycle/Ped. Facility Descp: LAKE HARBIN ROAD FROM MADDOX ROAD TO SR
42 Length: 4.76
TIP#: CL-AR-BP05
Project: 0004501 Type Work: Bicycle/Ped. Facility Descp: TRANSIT ORIENTED PED IMPROVEMENTS FM 1-75
TO US 19/41 Length: 4.76
TIP#: CL-AR-BP09
Project: 0004502 Type Work: Sidewalks
Descp: FOREST PARK SIDEWALKS TO SCHOOLS -
PHASE 3
Length: 4.76
TIP#: CL-AR-BP-2
Project: 0004633 Type Work: Bicycle/Ped. Facility Descp: JONESBORO DOWNTOWN PED STREETSCAPE
FM NORTH AVE TO SOUTH AVE Length: 2.90
TIP#: CL-162
Project: 0004638 Type Work: Curt>& Gutter
Descp: ANVILBLOCK ROAD FROM BOULDERCREST ROAD
TO ALLEN ROAD
Length: 1.32
TlP#: CL-230B
Project: 0006401 Type Work: ATMS/ITS
Descp: ATMS/I-75 S RAMP METERS-HAR FM HUDSON BR
TO CLEVELAND AVE
Length: 17.35
TlP#: AR-443
Project: 0006642 Type Work: Multi-use Trail Descp: MORROWS PATH SYSTEM - PHASE I
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 0006695 Type Work: Preliminary Engineering Descp: FOREST PARK - ATl STATE FARMERS MARKET
TRANSPORTATION STUDY Length: 0.00
TIP#: CL-244
Project: 0006793 Type Work: Bicycle/Ped. Facility
Descp: SR 54/JONESBORO RD - BIKE/PED UNDERPASS &
CROSSWALKS
Length: 0.00
TIP#: CL-AR-BP09
Phase Fund PE Local CST STP
Year LOCL LUMP
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
Local
CST Local
Year lOCL lOCL
Phase Fund PE Local CST CMAQ
Year LOCL 2005
Phase Fund PE Local CST CMAQ
Year lOCL 2005
Phase Fund PE Local CST STP
Year LOCL 2006
Phase Fund PE Bond ROW Bond CST Bond
Year Underway
2005 2006
Phase Fund PE NHS CST Bond
Year 2006 2007
Phase Fund CST STP
Year LUMP
Phase Fund PE H170
Year 2005
Phase Fund PE local CST STP
Year LOCL 2006
Federal $0
$920,000
State $0
$230,000
Federal
$0 $1,600,000
Federal $0 $0
State
$0 $0
State $0 $0
Federal $0
$688,000
State $0 $0
Federal $0
$332,000
State $0 $0
Federal $0
$1,041,600
State $0 $0
Federal
$0 $0
State
$200,000 $1,585,000
Federal $20,000 $0
State $5,000
$1,500,000
Federal $625,600
State $0
Federal $400,000
State $0
Federal $0
$2,200,000
State $0 $0
Other $150,000
$0
Other $0
$400,000
Other $30,000 $300,000
Other $140,000 $172,000
Other $85,000 $83,000
Other $260,500 $260,400
Other $0 $0
Other $0 $0
Other $156,400
Other $100,000
Other $200,000 $550,000
Total $150,000 $1,150,000
Total $0
$2,000,000
Total $30,000
$300,000
Total $140,000 $860,000
Total $85,000 $415,000
Total $260,500 $1,302,000
Total $200,000 $1,585,000
Total $25,000 $1,500,000
Total $782,000
Total $500,000
Total $200,000 $2,750,000
Page 77 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM ZaJZQQ5
Clayton
Project: 0007144 Type Work: Parking Areas
Descp: JONESBORO DOWNTOWN COMMUTER PARKING
DECK
Length: 0.00
TIP#: CL-246
Project: 322050 Type Work: Widening
Descp: SR 42 FM SR 138/STOCK'GE TO 1-675 NB
RAMPSI&CLVERT Lanes: Exist. 2 Prop. 4
Length: 2.30
TIP#: CL-064
Project: 342970. Type Work: Widening
Descp: SR 920 FM SR 3/US 19-41/CLAYTON TO 1-75IN
HENRY {REL SR 81)
Lanes: Exist. 2 Prop. 4
Length: 3.59
TlP#: HE-liS
Project: 712602- Type Work: Bridges Descp: LEE STREET IN MORROW OVER 1-75
Lanes: Exist. 0 Prop. 2
Length: 0.08 TlP#: CL-OS9
Project: 712630. Type Work: Interchange
Descp: 1-75 FM MT ZION BLVD TO OLD DIXIE(BRIDGES)&
SR 54 INTERCH
Length: 2.40
TlP#: CL-AR-031
Project: 713372. Type Work: ATMSIITS Descp: ATMS/I-285 SURVEIL FM I-B5/UNION CITY-FULTN E
TO 1-75/CLAYTN Length: 4.11
TlP#: AR-469
Project: 714095- Type Work: ATMS/ITS
Descp: ATMS/I-675 COMM/SURVEIL FM 175/HENRY TO
1-285/DEKALB
Length: 10.32
TIP#: AR-433A&B
Project: 720815. Type Work: Widening
Descp: SR 42 FM LAKE HARBIN RD N TO ANVIL BLOCK
RD
Lanes: Exist. 2 Prop. 4
Length: 3.20
TlP#: CLOI2
Project: 721290. Type Work: Widening
Descp: SR 85 FM SR 279/FAYETTE N TO 6-LN @
ROBERTS DRiCLAYTON
Lanes: Exist. 4 Prop. 6
Length: 4.00
TlP#: CLOIS
Project: 721440. Type Work: Widening
Descp: SR 54 FM MCDONOUGH RD/FAYETT NE TO SR
3/US 19/41/CLAYTON CO
Lanes: Exist. 2 Prop. 4
Length: 7.16
TlP#: CL-04IB
Project: 721480. Type Work: Widening
Descp: SR 138 FM WALT STEPHENS RD/CLAYTON EAST
TO 1-75/HENRY CO
Lanes: Exist. 2 Prop. 4
Length: 4.27
TIP#: CL-031
Phase Fund PE STP ROW Local CST Local
Year 2005 LOCL LOCL
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year 2006 After 2007 After 2007
Phase Fund
PE
NHS
CST NHS
Year Underway
2006
Federal $400,000
$0 $0
Federal $1,889,600
Federal $1,200,000
Federal $1,088,000
State $0 $0 $0
Other $100,000 $280,000 $5,000,000
State $0
Other $472,400
State $300,000
Other $0
State $272,000
Other $0
Phase Fund PE NHS ROW NHS CST Bond
Year Underway
2006 2007
Phase Fund PE NHS CST NHS
Year 2005 2006
Federal
State
$1,264,800 $0
$316,200 $15,139,000
Federal $120,000 $3,361,600
State $30,000 $840,400
Other
$0 $0
Other $0 $0
Phase Fund
PE
NHS
CST Bond
Year 2006 2007
Federal $120,000
$0
State $300,000 $16,493,000
Other $0 $0
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Federal $1,458,400
State $364,600
Other $0
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Federal $1,920,000
State $0
Other $480,000
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Federal $4,006,400
State $1,001,600
Other $0
Phase Fund PE NHS ROW NHS CST NHS
Year Underway Underway
2005
Federal
State
$10,632,000 $2,658,000
Other $0
Total
$500,000
$280,000
$5,000,000 Total
$2,362,000
Total $1,500,000 Total
$1,360,000
Total
$1,581,000 $15,139,000
Total $150,000
$4,202,000
Total $420,000
$16,493,000
Total $1,823,000 Total $2,400,000 Total
$5,008,000
Total $13,290,000 Page 78of 300
STATE TRANSPORTA TJONIMPROVEMENT PROGRAM W/ZQQ5
Clayton
Project: 731520. Type Work: Replace Bridge
Descp: SR 3/US 19 @ CEN OF GA RAILROAD .35 MI S OF
JCT 1-285
Length: 0.38
TIP#: CL-095
Project: 731885. Type Work: Signals Descp: SR 85 FM SR331 TO POINTE SOUTH PKWY &
SR138 FM SR85 TO NAVE Length: 6.62
TlP#: CL-235
Project: 742870. Type Work: Widening
Descp: SR 920 FROM SR 54 TO SR 3/US 19 (REL SR 81)&
FAYETTE Lanes: Exist. 2 Prop. 4
Length: 5.73
TlP#: CL-IOI
Project: 751790- Type Work: Widening
Descp: PANOLA RD FM BOULDERCREST RD TO
STAGECOACH RD Lanes: Exist. 2 Prop. 4
Length: 1.07
TIP#: CL-239
Project: 751810. Type Work: Widening
Descp: FLINT RIVER RD FM GLENWOODS DR TO
KENDRICKRD Lanes: Exist. 2 Prop. 4
Length: 1.07
TlP#: CL-020
Project: 752180. Type Work: Widening
Descp: CONLEY RD (AVIATION BLVD EXT) FM OLD DIXIE
HWY/SR 3 TO SR 54 Lanes: Exist. 2 Prop. 4
Length: 1.20
TlP#: CL-074
Project: 753010 Type Work: Replace Bridge
Descp: CR 1351/REX ROAD@ BIG COTTON INDIAN
CREEK IN REX
Length: 0.75
TlP#: CL-234A2&
Project: 753020 Type Work: Sidewalks Descp: CONLEY RD/CR 171 FM SR 54 TO CHEROKEE
TRAILIADD CURB/GUTTER Length: 2.73
TIP#: CL-231
Project: 770321 Type Work: Rail Projects Descp: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON)
PHASE 2 Length: 0.00
TIP#: AR-268B
Project: 771210 Type Work: Widening Descp: ANVILBLOCK RD FM 5 LANE TO BOULDERCREST
Lanes: Exist. 2 Prop. 4
Length: 1.50 TIP#: CL-230A
Project: TOO0585 Type Work: Transit Projects Descp: FY 2005 CLAYTON COUNTY SECTION 5307
Length: 0.00 TlP#: AR-CL5307
Phase Fund PE Bridge ROW Bridge ROW Bridge ROW Bridge CST Bridge Phase Fund PE Local CST STP
Year Underway Underway Underway
2005 2006 Year LOCL 2005
Federal
State
$4,488,000 $2,972,800
Federal $0
$1,099,200
$1,122,000 $743,200 State $0 $274,800
Phase Fund PE STP ROW STP CST STP
Year 2006 After 2007 After 2007
Federal $1,000,000
State $250,000
Phase Fund PE STP ROW Local CST STP
Year 2006 LOCL After 2007
Federal $4,000 $0
State $1,000 $0
Phase Fund PE Bond PE STP ROW Bond CST Bond
Phase Fund PE STP ROW STP ROW Bond CST Bond
Phase Fund PE Bridge ROW Bond CST Bridge CST STP
Phase Fund PE Bond ROW Bond CST Bond
Year Underway Underway
2005 2006
Year Underway After 2007
2007 After 2007
Year Underway Underway After 2007 After 2007
Year Underway
2005 2007
Federal
State
$0 $0
Federal
$400,000 $2,200,000
State
$0 $5,150,000
Federal
State
Federal
$0 $0
State
$400,000 $2,050,000
Phase Fund CST NHS
Year 2005
Federal $7,728,000
State $1,932,000
Phase PE ROW CST
Fund Bond Bond Bond
Year Underway
2005 2006
Phase Fund CST Transit
Year 2005
Federal
$0 $0
State
$200,000 $1,585,000
Federal $1,306,255
State $60,000
Other
$0 $0 Other $0 $0
Other $0
Other $0 $0
Other
$0 $0 Other
$0 Other
Other $0 $0
Other $0
Other $0 $0
Other $60,000
Total
$5,610,000 $3,716,000
Total $0
$1,374,000
Total $1,250,000
Total $5,000 $0
Total
$400,000 $2,200,000
Total
$5,150,000 Total
Total $400,000 $2,050,000 Total $9,660,000
Total $200,000 $1,585,000 Total $1,426,255
Page 79 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM Za12QQ5
Clayton
Project: T000592 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR CLAYTON
COUNTY
Length: 0.00
TIP#: AR-CL-5310
Project: T000933 Type Work: Transit Projects Descp: FY 2006 CLAYTON COUNTY SECTION 5307
Length: 0.00 TlP#:
Project: T000989 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR CLAYTON
COUNTY
Length: 0.00
TIP#:
Project: T001272 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR CLAYTON
COUNTY Length: 0.00
TIP#:
Project: T001384 Type Work: Rail Projects Descp: COMMUTER RAIL ATLANTNLOVEJOY
(OPERATIONS ASSISTANCE) Length: 0.00
TlP#: AR-168F
Phase Fund CST Transit
Year 2005
Federal $36,610
State $9,152
Other $0
Phase Fund CST Transit
Year 2006
Federal $604,800
State $67,200
Other $84,000
Phase Fund CST Transit
Year 2006
Federal $38,440
State $9,610
Other $0
Phase Fund CST Transit
Year 2007
Federal $40,632
State $10,090
Other $0
Phase Fund CST CMAQ
Year 2006
Federal $5,500,000
State $0
Other $1,375,000
Total
$45,762
Total
$756,000
Total
$48,050
Total
$50,722
Total
$6,875,000
Page 80 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zaJZQQ5
Clinch
Project: 0002274 Type Work: Streetscapes Descp: HOMERVILLE CENTRAL BUSINESS DISTRICT
STREETSCAPE Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006534 Type Work: Historic Facilities
Descp: RESTORATION OF RAILROAD DEPOT - ROOF
REPAIR ONLY
Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund CST STP
Year LUMP
Federal $650.000
State $0
Phase Fund CST STP
Year LUMP
Federal $100.000
State $0
Other $162.500
Other $25.000
Total $812.500
Total $125.000
Page 81 of 300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 2aJ2QQ5
Cobb
Project: 0000555 Type Work: Turn Lanes Descp: CHASTAIN RD @ BELLS FERRY RD/CR 2845
Length: 0.20 TlP#: CO-313
Project: 0000629 Type Work: Sidewalks
Descp: ROSWELL RD SIDEWALKS FM MANOR CREST CT
TO INDIAN HILLS PK
Length: 1.06
TlP#: CO-AR-BPJ9
Project: 0000630 Type Work: Bicycle/Ped. Facility
Descp: AUSTELL STREETSCAPE IMPROVEMENTS - 3
STREETS
Length: 0.00
TlP#: CO-AR-BP20
Project: 0001239 Type Work: Intersection Improvement
Descp: SR 360 AT CR 809/CORNER RD; CR 2083 AND CR
811IBULLARD RD
Length: 0.87
LUMP SUM PROJECT
TlP#: AR-157
Project: 0001758 Type Work: HOV Lanes
Descp: 1-285 FM 1-75/COBB THRU FULTON TO
1-85/DEKALB FOR HOV
Lanes: Exist. 10 Prop. 12
Length: 13.12
TlP#: AR-H-300A
Project: 0001760 Type Work: HOV Lanes
Descp: 1-20 FM SR 6/DOUGLAS THRU COBB TO SR
280/FUL TON - HOV LANES
Lanes: Exist. B Prop. 10
Length: 8.06
TIP#: AR-H-200
Project: 0002277 Type Work: Bicycle/Ped. Facility Descp: CONCORD ROAD LINEAR PARK
LUMP SUM PROJECT
Length: 0.00 TlP#: AR 384 ABC
Project: 0002850 Type Work: Sidewalks
Descp: ROSWELL STREET STREETSCAPES IN MARIETTA (LCI PROJECT) Length: 1.59
LUMP SUM PROJECT
TIP#: CO-AR283
Project: 0003041 Type Work: HOV Lanes Descp: 1-75N AT 1-285INTERCHANGE RECONSTRUCTION
FOR HOV LANES Length: 0.50
TlP#: AR-H-90JA
Project: 0003511 Type Work: Transit Projects Descp: GRTA NW CORRIDOR TRANSIT - GO.
Length: 0.00 TlP#: AR-25ID
Project: 0003512 Type Work: Transit Projects Descp: GRTA NW CORRIDOR TRANSIT - G.O.
Length: 0.00 TlP#: AR-25IB
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL 2006
Phase PE ROW CST
Fund Local Local STP
Year LOCL LOCL Underway
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL 2005
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund
PE
Bond
PE
NHS
PE
NHS
PE
NHS
ROW Bond
CST NHS
Phase Fund
PE
NHS
ROW NHS
CST Bond
Year After 2007 Underway
2006 2007 After 2007 After 2007 Year Underway 2006 After 2007
Phase Fund CST STP
Year LUMP
Phase PE ROW CST
Fund STP STP STP
Year Underway
LUMP LUMP
Phase Fund
PE
NHS
PE
NHS
PE
NHS
CST Bond
Phase Fund ROW Bond CST Bond
Year 2005 After 2007 After 2007 After 2007
Year 2007 After 2007
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year 2005 2006 After 2007
Federal
$0 $200,000
Federal $0 $0
State
$0 $0
Other
$50,000 $50,000
State $0 $0
Other $100,000
$60,000
Federal $0 $0
$1,250,400
Federal
$1,215,000 $459,000
Federal
State $0 $0 $0
Other $156,000
$50,000 $312,600
State
$135,000 $51,000
Other
$0 $0
State
Other
$4,000,000 $1,000,000
$0
$4,000,000 $1,000,000
$0
Federal $5,000,000
State $1,250,000
Other $0
Federal $500,000
State $0
Other $125,000
Federal
$181,760 $5,241,600
State
Other
$0
$45,440
$0 $1,310,400
Federal $4,000,000
State $1,000,000
Other $0
Federal $0
State $70,200,000
Other $0
Federal $0 $0
State $30,000,000 $32,100,000
Other $0 $0
Total
$50,000
$250,000 Total
$100,000
$60,000
Total
$156,000
$50,000
$1,563,000
Total
$1,350,000 $510,000
Total $5,000,000
$5,000,000
Total
$6,250,000
Total
$625,000
Total $227,200
$6,552,000 Total
$5,000,000
Total
$70,200,000
Total
$30,000,000
$32,100,000 Page 82of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5
Cobb
Project: 0003532 Type Work: Transit Projects Descp: NORTHWEST CORRIDOR TRANSIT - GRVA
Length: 0.00 TlPII. AR-25IB&C
Project: 0003534 Type Work: Transit Projects
Descp: 1-285FROM CUMBERLAND TO PERIMETER
CENTER TRANSIT
Length: 9.37
TlPII: AR-900C
Project: 0004403 Type Work: Interchange Descp: SR 120 AT SR 120 LOOP (EAST)
Length: 0.20
TlPII: CO-289
Project: 0004404 Type Work: Intersection Improvement Descp: SR 176/LOST MTN/MARS HILL@8 INTERSECTIONS
BT CORNER&COBB PKY Length: 1.60
TlPII: CO-325
Project: 0004405 Type Work: Intersection Improvement Descp: SR 5/AUSTELL AT 11 INTERSECTIONS BTWN
SANDTOWN & HOSPITAL SO Length: 4.54
TIPII: CO-326
Project: 0004446 Type Work: Realignment Descp: LEWIS RD FM SR 6/CH JAMES PKWY TO SR 6
BU/NEW S sa IPE-LCI]
Length: 1.30
TIPII: CO-3\2&B
Project: 0004447 Type Work: Intersection Improvement Descp: SR 120IDALLAS ROAD AT RIDGEWAY ROAD
Length: 1.65 TlPII: CO-32 \
Project: 0004448 Type Work: Intersection Improvement
Descp: SR 120/ROSWELL ROAD AT JOHNSON FERRY
ROAD
Length: 1.43
TIPII: CO-322
Project: 0004449 Type Work: Intersection Improvement Descp: SR 360/POWDER SPRINGS ROAD AT CHEATHAM
HILUCALLAWAY ROADS Length: 0.87
TlPII: CO-323
Project: 0004473 Type Work: Landscaping
Descp: COBB GALLERIA PKWY FM AKERS MILL TO
CUMBERLAND PKWY FY04 LCI Length: 0.00
LUMP SUM PROJECT
TlPII: CO AR 286
Project: 0004474 Type Work: Bicycle/Ped. Facility Descp: DOWNTOWN ACWORTH PEDESTRIAN CORRIDOR
IMPROVEMENTS FY 04 LCI Length: 0.00
LUMP SUM PROJECT
TIPII: CO AR 287
Phase CST CST CST
Fund Bond Bond Bond
Year After 2007 After 2007 After 2007
Phase Fund PE NHS ROW Bond CST Bond CST Bond
Phase Fund PE Bond ROW Bond CST Bond
Year 2007 After 2007 After 2007 After 2007
Year Underway
2005 2006
Phase Fund PE Bond ROW Bond CST Bond
Year Underway
2005 2006
Phase PE ROW CST
Fund Bond Bond Bond
Year Underway
2005 2006
Phase Fund
PE
STP
ROW Local
CST STP
CST STP
Phase Fund
PE
Local
ROW Local
CST STP
Year Underway
LOCL 2006 2006
Year LOCL LOCL 2005
Phase Fund
PE
Local
CST STP
Year LOCL 2005
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL 2005
Phase Fund PE STP CST STP
Year Underway
LUMP
Phase Fund CST STP
Year LUMP
Federal
State
Other
Federal $3,200,000
State $800,000
Other $0
Federal
$0 $0
State
$700,000 $5,600,000
Other
$0 $0
Federal
$0 $0
State
$600,000 $4,300,000
Other
$0 $0
Federal
$0 $0
State
$400,000 $3,200,000
Other
$0 $0
Federal
$0 $6,400,000 $2,960,000
Federal $0 $0
$72,000
State
Other
$0 $0 $740,000
State $0 $0 $0
$2,000,000 $1,600,000
$0
Other $10,000 $20.000 $18,000
Federal $0
$64,000
State $0
$16,000
Other $10,000
$0
Federal $0 $0
$981,275
Federal
$1,680,000
State $0 $0
$245,319
Other $97,533 $100,000
$0
State $0
Other $415,800
Federat $217,400
State $0
Other $54.350
Total
Total $4,000,000
Total $700,000 $5,600,000
Total $600,000 $4,300,000
Total $400,000 $3,200,000
Total $2,000,000 $8,000,000 $3,700,000
Total $10.000 $20.000 $90.000
Total $10,000 $80,000
Total $97,533
$100,000 $1.226,594
Total $2.095.800
Total $271,750
Page 83 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Cobb
Project: 0004504 Type Work: Bicycle/Ped. Facility Descp: VETERANS MEMORIAL HIGHWAY FM THORNTON
RD/SR 6 TO ROSEHILL ST Length: 1.00
TIP#: COARBPJ8
Project: 0004505 Type Work: Bicycle/Ped. Facility Descp: ROnENWOOD CREEK TRAIL FM PACES MILL
NPS TO TERRELL MILL RD Length: 4.40
TlP#: COARBPJ9
Project: 0004506 Type Work: Bicycle/Ped. Facility Descp: SILVER COMET TRL EXT FM MAVELL RD TO
SPRING HILL PKY PHASE 1 Length: 2.44
TlP#: COARBP20
Project: 0004507 Type Work: Bicycle/Ped. Facility Descp: SILVER COMET TRL FM SPRING HILL PKWY TO
MT WILKINSON PHASE 2 Length: 0.00
TlP#: CO-AR-BP20
Project: 0004508 Type Work: Bicycle/Ped. Facility Descp: SR 120/DALLAS HIGHWAY FM JOHN WARD RD TO
PAULDING COUNTY LN Length: 7.06
TlP#: CO-ARBP21
Project: 0004509 Type Work: Bicycle/Ped. Facility Descp: KENNESAW RAILROAD UNDERPASS AT SOUTH
OF CHEROKEE STREET Length: 0.00
TlP#: CO-AR-BP21
Project: 0004510 Type Work: Bicycle/Ped. Facility Descp: FLOYD ROAD FM US 78/278 VETERANS
MEMORIAL HIGHWY TO HICKS RD Length: 1.55
TlP#: COAR-BP2J
Project: 0004511 Type Work: Bicycle/Ped. Facility Descp: NOONDAY CREEK TRAIL FM US 41/COBB
PARKWAY TO BELLS FERRY RD Length: 0.00
TlP#: CO-AR-BP21
Project: 0005653 Type Work: ATMS/ITS Descp: ATMS ENHANCEMENT PHASE 4
Length: 0.00 TlP#: CO-2760
Project: 0005788 Type Work: Intersection Improvement
Descp: SR 5 SPUR @ CR 2907/SANDY PLAINS RD 0.90 MI EAST OF 1-75 Length: 0.25
LUMP SUM PROJECT
TlP#: Lump
Project: 0006012 Type Work: Intersection Improvement Descp: SR 5 CO/BARREn PKWY AT CR 175/COBB PLACE
BLVD Length: 0.29
LUMP SUM PROJECT
TlP#: LUMP
Phase Fund
PE
Local
CST CMAQ
Year LOCL 2005
Phase Fund PE Local ROW Local CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL 2007
Phase Fund
PE
Local
ROW Local
CST H170
CST STP
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005 2005
Year LOCL LOCL 2005
Phase Fund PE CMAQ ROW CMAQ CST CMAQ
Year 2005 2006 After 2007
Phase Fund CST STP
Year 2005
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Federal $0
$352,000
Federal $0 $0
$3,000,000
Federal $0 $0
$1,708,000
Federal $0 $0
$1,708,000
Federal $0 $0
$2,000.000
Federal $0 $0
$400,000 $1,360,000
Federal $0 $0
$718,080
Federal $310,400 $310,400
Federal $2,480,000
Federal
$274,500
Federal $0 $0
$491,400
State $0 $0
State $0 $0 $0
State $0 $0 $0
State $0 $0 $0
State $0 $0 $0
Slale $0 $0 $0 $0
State $0 $0 $0
Slate $0 $0
Slale $0
Slate
$30,500
Slale $0 $0
$54.600
Other $44,000 $88,000
Other $750,000 $750,000 $750,000
Other $213,500 $213,500 $427,000
Other $0 $0
$427,000
Other $0 $0
$500,000
Other $0 $0
$100,000 $340,000
Other $0 $0
$179,520
Other $77,600 $77,600
Other $620,000
Other
$0
Other $0
$138,000 $0
Total $44,000 $440,000
Total $750,000 $750,000 $3,750.000
Total $213,500 $213.500 $2,135.000
Total $0 $0
$2.135,000
Total $0 $0
$2,500,000
Total $0 $0
$500.000 $1,700.000
Tolal $0 $0
$897,600
Total $388.000 $388,000
Tolal $3,100,000
Total
$305,000
Total $0
$138,000 $546,000
Page 84 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Cobb
Project: 0006049 Type Work: Widening
Descp: SR 360 FM SR 176/NEW MACLAND ROAD TO SR
120/PAULDING COUNTY
Lanes: Exist. 2 Prop. 4
Length: 5.80
TlP#: CO-367
Project: 0006262 Type Work: Parking Areas
Descp: PARKING & PAVING AROUND SEN RUSSELL SQ&NEW CITY HALL - LCI Length: 0.00
LUMP SUM PROJECT
TIP#: CO-AR 292
Project: 0006264 Type Work: Park & Ride Lot
Descp: PARK & RIDE LOT AT FLOYD ROAD AND CLAY
ROAD - LCI PROJECT
Length: 0.40
LUMP SUM PROJECT
TIP#: CO-AR 295
Project: 0006269 Type Work: Sidewalks
Descp: AKERS MILL FM CUMBERLAND BLVD TO CHATTAHOOCHEE NRA - LCI Length: 0.66
LUMP SUM PROJECT
TlP#: CO-AR-291
Project: 0006295 Type Work: Intersection Improvement
Descp: 1-285INTERCHANGE @ SR 280/S0UTH COBB DRIVE Length: 0.80
LUMP SUM PROJECT
TIP#:
Project: 0006325 Type Work: Replace Bridge
Descp: CR 17821CONCORD ROAD OVER SILVER COMET
TRAIL
Length: 0.40
TIP#: CO-369
Project: 0006334 Type Work: ATMS/ITS Descp: ATMS/I-75 N COMMUNIC/SURVEILANCE FM WADE
GREEN RD TO SR 92 Length: 4.28
TIP#: AR-432
Project: 0006396 Type Work: ATMS/ITS Descp: ATMS/I-75 N RAMP METERS-HAR FROM 1-85TO
WADE GREEN ROAD Length: 8.02
TlP#: AR-438
Project: 0006400 Type Work: ATMS/ITS Descp: ATMS/I-285 S RAMP METERS-HAR FM SR 280 TO
COBB PKWY/US 41 Length: 4.31
TIP#: AR-442
Project: 0006402 Type Work: ATMS/ITS Descp: ATMS/I-20 RAMP METERS-HAR FM THORNTON
RD TO EVANS MILL RD Length: 30.30
TlP#: AR-444
Project: 0006417 Type Work: HOV Lanes
Descp: 1-75FM BANBERRY ROAD TO ALLGOOD ROAD
HOV INTERCHANGE
Lanes: Exist. 8 Prop. 10
Length: 2.31
T/P#: AR-H-002
Phase Fund PE STP ROW STP CST STP
Year 2005 After 2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase Fund PE STP CST STP
Year Underway
LUMP
Phase Fund
PE
1M
ROW 1M
CST 1M
Year Underway
LUMP LUMP
Phase Fund PE Bridge ROW Local CST Bridge
Year 2005 LOCL After 2007
Phase Fund PE NHS CST NHS
Year 2005 2006
Phase Fund PE NHS CST Bond
Year 2005 2006
Phase Fund PE NHS CST Bond
Year 2006 2007
Phase Fund PE NHS CST Bond
Year 2006 2007
Phase Fund PE NHS ROW Bond ROW Bond CST Bond
Year 2006 After 2007 After 2007 After 2007
Federal $1,440,000
State $360,000
Federal $40,000
$243,200
Federal $400,000 $320,000
Federal $2,175,200
State $0 $0
State $0 $0
State $0
Federal
$135,000 $1,256,400
Federal $63,360 $0
State
$15,000 $139,600
State $0 $0
Federal $120,000 $4,000,000
State $30,000 $1,000,000
Federal $28,000 $0
State $7,000
$2,000,000
Federal $20,000 $0
State $5,000
$750,000
Federal $32,000 $0
State $8,000
$2,500,000
Federal $9,600,000
State $2,400,000
Other $0
Other $10,000 $60,800
Other $100,000
$80,000
Other $543,800
Other $0 $0
Other $15,840 $100,000
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Total $1,800,000
Total $50,000 $304,000
Total $500,000 $400,000
Total $2,719,000
Total $150,000 $1,396,000
Total $79,200 $100,000
Total $150,000 $5,000,000
Total $35,000 $2,000,000
Total $25,000
$750,000
Total $40,000 $2,500,000
Total $12,000,000
Page 85 of 300
STATE TRANSPORTATlON IMPROVEMENT PROGRAM
za12QQ5
Cobb
Project: 0006418 Type Work: HOV Lanes
Descp: 1-75 FM ALLGOOD ROAD TO 1-575 HOV
INTERCHANGE Lanes: Exist. 8 Prop. 10
Length: 3.73
TlP#: AR-H-003A
Project: 0006428 Type Work: Transit Projects
Descp: 1-285 FROM CUMBERLAND TO PERIMETER
TRANSIT CORRIDOR
Length: 9.91
TIP#:
Project: 0006429 Type Work: Transit Projects Descp: 1-285 FROM CUMBERLAND TO PERIMETER
TRANSIT CORRIDOR Length: 0.00
TIP#:
Project: 0006578 Type Work: Landscaping
Descp: 1-285@ US 41/COBB PARKWAY INTERCHANGE
BEAUTIFICATION
Length: 0040
LUMP SUM PROJECT
TIP#:
Project: 0006579 Type Work: Sidewalks
Descp: SCHOOL ORIENTED SIDEWALKS - MULTIPLE AREAS Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006580 Type Work: Transportation museums Descp: RAILROAD EDUCATION CENTER - SOUTHERN
MUSEUM OF CIVIL WAR Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006581 Type Work: Multi-use Trail Descp: ACWORTH MULTI-USE TRAIL SYSTEM PHASE I
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006622 Type Work: Multi-use Trail Descp: SWEETWATER CREEK GREENWAY & TRAIL
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006723 Type Work: Bicycle/Ped. Facility Descp: SR 360/POWDER SPRINGS FM GARRISON RD TO
COUNTY SERVICES PKWY Length: 2.13
TIP#: CO-AR-BP21
Project: 0006755 Type Work: Special Studies Descp: SR 6/CAMP CREEK PKWY FM 1-85TO W HIRAM
PKWY- CORRIDOR STUDY Length: 29.07
TlP#: AR-465
Project: 0006794 Type Work: ATMS/ITS Descp: ADVANCED TRANSPORTATION MANAGEMENT-
PHASE V Length: 0.00
TIP#: CO-333
Phase Fund PE NHS ROW Bond CST NHS
Year 2007 After 2007 After 2007
Phase Fund PE Bond PE Bond ROW Bond CST Bond
Phase Fund
PE
Bond
CST Bond
Year 2005 2006 After 2007 After 2007
Year 2007 After 2007
Federal $6,400,000
State $1,600,000
Federal $0 $0
State $5,000,000 $20,000,000
Federal $0
State $11,000,000
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase Fund CST STP
Year LUMP
Federal $800,000
State $0
Phase Fund CST STP
Year LUMP
Federal $400,000
State $0
Phase Fund CST STP
Year LUMP
Federal $700,000
State $0
Phase Fund CST STP
Year LUMP
Federal $350,400
State $0
Phase Fund
PE
Local
CST STP
Year LOCL 2007
Federal $0
$1,014,000
State $0 $0
Phase Fund CST STP
Year 2006
Federal $600,000
State $0
Phase Fund CST CMAQ
Year 2006
Federal $1,870,000
State $0
Other $0
Other $0 $0
Other $0
Other $125,000
Other $200,000
Other $100,000
Other $175,000
Other $87,600
Other $160,000 $253,500
Other $150,000
Other $467,500
Total
$8,000,000
Total
$5,000,000
$20,000,000
Total
$11,000,000
Total
$625,000 Total
$1,000,000
Total $500,000
Total
$875,000 Total $438,000 Total $160,000
$1,267,500
Total $750,000 Total
$2,337,500
Page 86of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM zatZQQ5
Cobb
Project: 0006795 Type Work: ATMS/ITS
Descp: ADVANCED TRANSPORTATION MANAGEMENT-
PHASE IX
Length: 0.00
TIP#: CO-334
Project: 0006797 Type Work: Signals Descp: TRAFFIC SIGNAL RETIMING - FY 2006
Length: 0.00 TlP#: CO-335B
Project: 0006798 Type Work: Signals Descp: TRAFFIC SIGNAL RETIMING - FY 2007
Length: 0.00 TIP#: CO-335C
Project: 0006799 Type Work: ATMS/ITS DesclF ITS INTEGRATION
Length: 0.00 TIP#: CO-AR-289A
Project: 0006801 Type Work: Transit Projects Descp: CCT - SIXTEEN CLEAN FUEL
EXPANSION/REPLACEMENT BUSES Length: 0.00 TIP#: CO-AR-300
Project: 0006802 Type Work: Transit Projects Descp: CCT - AUTOMATION OF FUNCTIONS
Length: 0.00
TlP#: CO-AR-301
Project: 0006803 Type Work: Bicycle/Ped. Facility Descp: SOUTH HURT RD FM RUSSELL ELEM TO
CONCORD RD & MAVELL RD Length: 1.27 TlP#: CO-AR-BP21
Project: 0006804 Type Work: Multi-use Trail Descp: MARIETIA MULTI-USE TRAIL - FY 2008
Length: 0.00 TIP#: CO-AR-BP21
Project: 0006805 Type Work: Sidewalks Descp: LOWER ROSWELL ROAD
Length: 14.95 TlP#: CO-AR-BP22
Project: 0006867 Type Worle Intersection Improvement
Descp: SR 5/CHURCH/CHEROKEE STREET @ TOWER
ROAD
Length: 0.40
TIP#: CO-330
Project: 0006873 Type Work: Multi-use Trail
Descp: KENNESAW MOUNTAIN TO CHATIAHOOCHEE
RIVER TRAIL
Length: 0.00
TlP#: CO-AR-BPI2
Phase Fund CST CMAQ
Year 2007
Phase Fund CST CMAQ
Year 2007
Phase Fund CST CMAQ
Year Atter 2007
Phase Fund CST STP
Year 2007
Phase Fund CST STP
Year 2006
Phase Fund CST CMAQ
Year 2006
Phase Fund CST CMAQ
Year 2006
Phase Fund CST STP
Year 2007
Phase Fund CST CMAQ
Year 2007
Phase Fund
PE
Local
ROW Local
CST STP
Phase Fund
PE
Local
ROW STP
CST STP
Year LOCL LOCL 2007
Year LOCL 2006 2007
Federal $1,870,000
Federal $320,000
Federal
Federal $1,000,000
Federal $4,880,000
Federal $1,200,000
Federal $1.376,000
Federal $662,400
Federal $90,400
Federal $0 $0
$2.280.000 Federal $0 $160.000
$2,000,000
State $0
Other $467,500
State $0
Other $80,000
State
Other
State $0
Other $250,000
State $0
Other $1.220.000
State $0
Other $300,000
State $0
Other $344.000
State $0
Other $165,600
State $0
Other $22.600
State $0 $0 $0
Other $150.000 $1,200,000 $570,000
State $0 $0 $0
Other $300,000
$40,000 $500,000
Total $2,337,500
Total $400,000
Total
Total $1,250,000
Total $6.100.000
Total $1.500,000
Total $1,720.000
Total $828.000
Total $113,000
Total $150,000 $1,200.000 $2.850.000 Total $300.000 $200.000 $2,500,000
Page 87 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Cobb
Project: 0006875 Type Work: Sidewalks Descp: CCT - SUPPORTIVE SIDEWALKS - 2008
Phase Fund CST CMAQ
Length: 0.00 TlP#: CO-AR-BP21
Project: 0007094 Type Work: Park & Ride Lot Descp: GALLERIA PARK AND RIDE LOT
Phase Fund CST Bond
Length: 0.00 TlP#: CO-AR-303
Project: 0007132 Type Work: Miscellaneous Improvement
Descp: CR 2373/FLOYD RD FM SR 8/US 78/US 278 TO CR
28941HICKS RD
Length: 1.55
TlP#: CO-337
Project: 713370. Type Work: ATMS/ITS
Descp: ATMS/I285 SURVEIL FM 1-20W IN FUL TN N TO
175 IN COBB
Length: 6.57
TlP#: AR279
Project: 713405. Type Work: ATMS/ITS Descp: ATMS/I-285 RAMP METERS-HAR FM 1-75 IN COBB
E TO 1-85 IN DEK Length: 13.17
TIP#: AR-24 I
Project: 713620. Type Work: Widening
Descp: 1-20 FM SR 6ITHORNTON RD/DOUGLAS TO
FULTON INDUST BLVD/FULTO
Lanes: EXist. 6 Prop. 8
Length: 4.94
TlP#: DO-AR-057
Project: 714080. Type Work: ATMSIITS Descp: ATMS/I-20 COMM/SURVEI FM SR 6ITHORNTON
RD TO 1-285/FULTON Length: 5.99
TIP#: AR-447
Project: 714090. Type Work: ATMSIITS Descp: ATMS: 1-575 COMM/SURVEILLANCE FM 1-75/COBB
TO SR 921CHEROKEE Length: 8.58
TIP#: AR-341
Project: 714130. Type Work: HOV Lanes
Descp: 1-75 FM AKERS MILL RD TO BANBERRY ROAD
FOR HOV LANES
Lanes: Exist. 8 Prop. 10
Length: 5.14
TlP#: AR-H-OOI
Project: 721152. Type Work: Widening
Descp: SR 3IUS 41/COBB PKWY FM PACES MILL RD TO
AKERS MILL ROAD
Lanes: Exist. 4 Prop. 8
Length: 0.84
TlP#: CO-23I
Project: 721310- Type Work: Widening
Descp: SR 120/ROSWELL RD FM SR 120LP TO
BRIDGEGATE DR
Lanes: Exist. 4 Prop. 6
Length: 1.43
TlP#: CO-I 77
Phase Fund
PE
Local
ROW Local
CST H170
Phase Fund
PE
STP
CST Bond
Phase Fund
PE
NHS
CST NHS
Phase Fund
PE
NHS
ROW NHS
CST NHS
Phase Fund
PE
NHS
CST NHS
Phase Fund
PE
NHS
PE
NHS
CST NHS
Phase Fund
PE
NHS
PE
NHS
PE
NHS
ROW Bond
CST Bond
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
Bond
PE
STP
ROW Bond
CST Bond
Year After 2007
Year 2005
Year LOCL LOCL 2005
Year Underway
2005
Year 2005 2006
Year 2006 After 2007 After 2007
Year 2005 2006
Year Underway
2005 2006
Year Underway
2006 2005 2007 After 2007 Year Underway 2007 After 2007
Year Underway Underway
2005 2006
Federal
State
Other
Federal $0
State $20,000,000
Other $0
Federal $0 $0
$1.600.000
State $0 $0 $0
Other $0 $0
$400,000
Federal
State
$0 $11,923,000
Other $0
Federal $40,000
$1.200,000
State $10,000 $300,000
Other $0 $0
Federal $160,000
State $40,000
Other $0
Federal $120,000 $7,932,695
State $30,000 $1,983,174
Other $0 $0
Federal
$120,000 $10,440,800
State
$30,000 $2,610,200
Other
$0 $0
Federal
State
Other
$3,360,000
$840,000
$0
$6,240,000 $1,560,000
$0
$0 $83,300,000
$0
Federal
State
Other
$5,308,800
$0 $1,327,200
Federal
State
Other
$0
$988,000
$0
$0
$7,680,000
$0
Total
Total
$20,000,000
Total
$0
$0 $2,000,000
Total
$11,923,000 Total
$50.000
$1,500,000
Total
$200,000
Total
$150,000
$9,915,869
Total $150,000 $13,051,000 Total $4,200,000 $7.800,000
$83,300,000
Total
$6.636,000
Total $988,000 $7,680,000
Page 88of 300
STATE TRANSPORTA TION IMPROVEMENT PROGRAM 21712005
Cobb
Project: 731865- Type Work: Replace Bridge
Descp: SR 92 @ PROCTOR CREEK/LAKE ACWORTH IN
SWACWORTH
Length: 0.57
TIP#: CO-311
Project: 752830- Type Work: Replace Bridge
Descp: CR 4455/CANTON ROAD &RR BR OVER SR 3/US
41 N OF MARIETIA
Length: 0.41
TIP#: CO-272
Project: 752710- Type Work: Replace Bridge
Descp: CS 3498/ATLANTA RD@ CHATIAHOOCHEE
RIVER FULTON-COBB CO LINE
Lanes: Exist. 2 Prop. 4
Length: 0.60
TlP#: CO-I04
Project: 752850- Type Work: Replace Bridge
Descp: SR 280/JAMES JACKSON PKWY @ CHATT.
RIVER-SOU RR &APPROACHES
Lanes: Exist. 2 Prop. 4
Length: 1.08
TIP#: AT-I08A&B
Project: 771132- Type Work: Bicycle/Ped. Facility Descp: MARIETTA MULTI USE TRAIL - PHASE 2
Length: 0.00 TlP#: CO-AR-BPI7
Project: 771232- Type Work: Bicycle/Ped. Facility Descp: MULTI-USE TRAIL FM KENNESAW MTN TO
CHATTAHOOCHEE TRAIL Length: 0.00
LUMP SUM PROJECT
TlP#: AR-384ABC
Project: MOO1533 Type Work: Resurface & Maintenance
Descp: SR 401/SR 403 FR UNIVERSITY TO BROOKWOOD
1-285/1-75 RAMPS
Length: 13.77
TIP#: AR-IIIG
Project: M002563 Type Work: Resurface & Maintenance
Descp: SR 120 FROM JOHN WARD ROAD TO EAST
PIEDMONT ROAD
Length: 8.06
LUMP SUM PROJECT
TIP#: lump
Project: M002565 Type Work: Resurface & Maintenance Descp: SR 5 CONN FROM SR 3 TO SR 5
LUMP SUM PROJECT
Length: 2.07 TIP#: lump
Project: M002912 Type Work: Resurface & Maintenance
Descp: 1-20EB FM SWEETWATER CREEK TO HE HOLMES
RD &1-285 RAMPS
Length: 8.63
LUMP SUM PROJECT
TlP#:
Project: M002965 Type Work: Guardrail
Descp: 1-75 FROM SR 5 CONNECTOR TO CR 633/RED TOP
MOUNTAIN ROAD
Length: 24.53
TlP#: AR-126G
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 2007
Federal
$80,000 $2,764,800
State
$20,000 $691,200
Phase PE ROW CST CST
Fund Bridge Bridge Bridge STP
Phase Fund
PE Bond
PE
Bridge
ROW Bond
CST Bond
Phase PE ROW CST CST
Fund Bridge Bridge Bridge STP
Phase PE ROW CST
Fund Local Local CMAQ
Year Underway
2005 2007 2007
Year Underway Underway
2005 2006
Year Underway
2006 2007 2007
Year LOCL LOCL 2006
Federal
$2,250,400 $3,355,200 $1,728,000
Federal
State
$562,600 $838,800 $432,000 State
$0 $0
Federal
$1,412,000 $5,600,000 $1,600,000
Federal $0 $0
$172,000
$500,000 $6,700,000
State
$353,000 $1,400,000
$400,000
State $0 $0 $0
Phase PE ROW CST
Fund Local Local STP
Year LOCL LOCL LUMP
Federal $0 $0
$384,000
State $0 $0 $0
Phase Fund PE NHS CST NHS
Year 2007 2007
Federal $1,600,000 $20,800,000
State $400,000 $5,200,000
Phase Fund CST STP
Year LUMP
Federal $600,000
State $150,000
Phase Fund CST STP
Year LUMP
Federal $540,000
State $135,000
Phase Fund CST 1M
Year LUMP
Federal $11,700,000
State $1,300,000
Phase Fund
PE
1M
CST 1M
Year 2005 2005
Federal $1,800,000 $38,400,000
State $200,000 $9,600,000
Other $0 $0
Other
$0 $0 $0 Other
$0 $0 Other
$0 $0 $0 Other $73,950 $30,000 $160,394
Other $0 $0
$96,000
Other $0 $0
Other $0
Other $0
Other $0
Other $0 $0
Total $100,000 $3,456,000
Total $2,813,000 $4,194,000 $2,160,000
Total
$500,000 $6,700,000
Total $1,765,000 $7,000,000 $2,000,000
Total $73,950 $30,000 $332,394
Total $0 $0
$480,000
Total $2,000,000 $26,000,000
Total $750,000
Total $675,000
Total $13,000,000
Total $2,000,000 $48,000,000
Page 89 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Cobb
Project: M002970 Type Work: Guardrail Descp: 1-285 FROM WEST PACES FERRY ROAD TO
ASHFORD DUNWOODY ROAD Length: 9.78
TlP#: AR-IIIH
Project: T000583 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR CCT
Length: 0.00
TlP#: AR-CO-5307
Project: T000593 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR COBB
COUNTY
Length: 0.00
TlP#: AR-CO-5310
Project: T000934 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR CCT
Length: 0.00 TlP#: AR-CO-5307
Project: T000940 Type Work: Transit Projects
Descp: FY 2006 Section 5309 Capital for Cobb Community
Transit
Length: 0.00
TlP#:
Project: T000990 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR COBB
COUNTY Length: 0.00
TlP#: AR-CO-5310
Project: T001270 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR COBB
COUNTY Length: 0.00
TlP#: AR-CO-5310
Project: T001327 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR CCT
Length: 0.00 TlP#: AR-CO-5307
Phase Fund PE NHS CST NHS
Year 2007 2007
Federal $1,600,000 $30,400,000
State $400,000 $7,600,000
Other $0 $0
Phase Fund CST Transit
Year 2005
Federal $5,008,743
State $0
Other $1,252,186
Phase Fund CST Transit
Year 2005
Federal $96,099
State $24,025
Other $0
Phase Fund CST Transit
Year 2006
Federal $5,002,941
State $0
Other $1,250,735
Phase Fund CST Transit
Year 2006
Federal $1,250,000
State $156,250
Other $156,250
Phase Fund CST Transit
Year 2006
Federal $100,904
State $25,226
Other $0
Phase Fund CST Transit
Year 2007
Federal $105,950
State $26,487
Other $0
Phase Fund CST Transit
Year 2007
Federal $5,040,457
State $0
Other $1,260,114
Total
$2,000,000
$38,000,000
Total
$6,260,929
Total
$120,124
Total
$6,253,676 Total
$1,562,500
Total
$126,130
Total
$132,437
Total
$6,300,571
Page 90 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I2QQ5
Coffee
Project: 0001046 Type Work: Widening
Oescp: SR 32 FM NE OCILLA BYP TO 4 LANE @CR
296/MITCHELL RD Lanes: Exist. 2 Prop. 4
Length: 19.04
TIP#:
Project: 0003789 Type Work: Intersection Improvement Oescp: SR 158 AT CR 513IWOODROW STONE ROAD
LUMP SUM PROJECT
Length: 0.20 TIP#:
Project: 432117. Type Work: Replace Bridge
Oescp: SR 135/US 221 @ TIGER CREEK APP 6 MI NE OF
DOUGLAS
Length: 0.30
TIP#:
Project: 442970. Type Work: Replace Bridge
Oescp: SR 268/AMBROSEBROXTON RD @ HALLS CREEK
2 MI W OF BROXTON
Length: 0.38
TlP#:
Project: 442971. Type Work: Replace Bridge
Oescp: SR 268/AMBROSEBROXTON RD @ ROSES CRK
1.1 MI W OF BROXTON
Length: 038
TIP#:
Phase Fund PE State ROW State CST State
Year 2005 After 2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase PE ROW CST CST
Fund Bridge Bridge Bridge STP
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 After 2007 After 2007
Year Underway
2006 After 2007
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2006 After 2007
Federal $0
State $3,900,000
Federal $9,900
$115,200
Federal $11,200
State $1,100
$12,800
State $2,800
Federal $16,000
State $4,000
Federal $16,000
State $4,000
Other $0
Other $0 $0
Other $0
Other $0
Other $0
Total $3,900,000
Total $11,000 $128,000 Total $14,000
Total $20,000
Total $20,000
Page 91 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Colquitt
Project: 0000429 Type Work: Intersection Improvement
Descp: SR 35/US 319 & LANE ST AT 7 INTERSECTIONS IN
MOULTRIE
Length: 0.85
TlP#:
Project: 0001358 Type Work: Replace Bridge Descp: SR 37 @ OKAPILCO CREEK EAST MOULTRIE
Length: 0.30 TlP#:
Project: 0006691 Type Work: Streetscapes Descp: MOULTRIE STREETSCAPE INITIATIVE - PHASE II
Length: 0.00 TlP#:
Project: 431100- Type Work: Replace Bridge Descp: SR 256 @ WARRIOR CREEK NORTH OF SR 35
Length: 0.50
TIP#:
Project: 442750- Type Work: Replace Bridge Descp: CR 493/FUNSTON-SALE CITY @ UTILE CREEK
APP 1 MI NW FUNSTON Length: 0.20
TIP#:
Project: 471450- Type Work: Replace Bridge Descp: CR 4/wILBUR MURPHY RD.@ UTTLE CREEK &
OVERFLOW S OF FUNSTON Length: 0.59
TlP#:
Project: 471455- Type Work: Replace Bridge
Descp: CR 186/HAGET STILL ROAD@ OCHLOCKONEE
RIVER SE OF DOERUN
Length: 0.23
TlP#:
Project: 471460- Type Work: Replace Bridge Descp: CR 355/0'NEAL ROAD @ BRUSHY BRANCH APP
3.7 MI SW OF DOERUN Length: 0.20
TlP#:
Project: M001147 Type Work: Miscellaneous Improvement Descp: SR 33 BET NE 5TH AVE TO NE 4TH AVE
LUMP SUM PROJECT
Length: 0.22 TlP#:
Phase Fund
PE
NHS
ROW STP
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund CST H680
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2006
Year Underway
2005 2006
Year 2005
Year Underway
2007 After 2007
Year Underway
LOCL 2006
Year Underway
LOCL 2006
Year Underway
LOCL 2006
Year Underway
LOCL 2007
Year LUMP LUMP LUMP
Federal
$1.118,400
Federal $10,400
$405,600
Federal $500,000
Federal $4,000
Federal $0
$360,000
Federal $0
$1,220,000
Federal $0
$628,691
Federal $0
$272,800
Federal $40,000 $22,400
$231,200
State
$279,600
State $2,600
$101,400
State $0
State $1,000
State $0
$90,000
State $0
$305.000
State $0
$157,173
State $0 $0
State $10.000
$5,600 $57,800
Other
$0
Other $0 $0
Other $0
Other $0
Other $50,000
$0
Other $10,000
$0
Other $10,000
$0
Other $10.000 $68.200
Other $0 $0 $0
Total
$1,398,000
Total
$13.000
$507.000
Total
$500,000
Total
$5,000
Total $50,000 $450,000 Total $10,000
$1.525.000
Total
$10.000 $785,864 Total $10.000 $341,000 Total
$50.000
$28.000
$289,000
Page 92of300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 2J7I2QQ5
Columbia
Project: 0000766 Type Work: Interchange
Descp: 1-20 UPGRADES @ SR 47;SR388/COLUMIA & SR
150/MCDUFFIE
Length: 7.02
TIP#: 1M -4
Project: 0002041 Type Work: Intersection Improvement
Descp: SR 104 @CR 16/HALALI ROAD IN COLUMBIA
COUNTY
Length: 0.50
LUMP SUM PROJECT
TIP#:
Project: 0002286 Type Work: Sidewalks
Descp: HARLEM DOWNTOWN WALKWAY
REVITALIZATION PLAN
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0003662 Type Work: Intersection Improvement
Descp: SR 104IWASHINGTON ROAD @ CR 99/GIBBS
ROAD
Length: 0.38
LUMP SUM PROJECT
TlP#: NHSI
Project: 0004732 Type Work: Intersection Improvement Descp: SR 47 AT SR 223
LUMP SUM PROJECT
Length: 0.52 TlP#: STP LUMP S
Project: 0006420 Type Work: Barriers
Descp: 1-20 FM SR 80 TO RICHMOND COUNTY - CABLE
MEDIAN BARRIERS
Length: 29.52
LUMP SUM PROJECT
TlP#:
Project: 0006452 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ 7 LOC ALONG SR
383 IN COLUMBIA CO
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006602 Type Work: Multi-use Trail
Descp: AUGUSTA CANAL HISTORIC HEADGATES
MULTI-USE FACILITIES
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006603 Type Work: Multi-use Trail Descp: EUCHEE CREEK GREENWAY - PHASE II
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006694 Type Work: Rail Projects Descp: AUGUSTA RAIL RELOCATION PROJECT
Length: 0.00 TlP#:
Project: 0006699 Type Work: Barriers Descp: COLUMBIA COUNTY NOISE BARRIERS
Length: 15.32 TlP#:
Phase Fund CST 1M
Year 2005
Federal $10,260,000
State $1,140,000
Phase Fund
PE
STP
CST STP
Year LUMP LUMP
Phase Fund CST STP
Year LUMP
Federal $9,000
$378,900
State $1,000
$42,100
Federal $300,000
State $0
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase PE ROW CST
Fund STP STP STP
Year Underway
LUMP LUMP
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $0
$454,500
Federal $518,400 $378,000
Federal $2,104,200
State $0
$50,500
State $57,600 $42,000
State $233,800
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $392,000
State $98,000
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase Fund CST STP
Year LUMP
Federal $300,000
State $0
Phase Fund CST H170
Year 2005
Federal $1,000,000
State $0
Phase Fund
PE
H170
CST H170
Year 2005 2006
Federal $100,000 $100,000
State $0 $0
Other $0
Other $0 $0
Other $75,000
Other $394,400
$0 Other
$0 $0 Other $0
Other $0
Other $125,000
Other $75,000
Other $0
Other $0 $0
Total $11,400,000
Total $10,000 $421,000
Total $375,000
Total $394,400 $505,000 Total $576,000 $420,000 Total $2,338,000
Total $490,000
Total $625,000
Total $375,000
Total $1.000,000
Total $100,000 $100,000
Page 93 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Columbia
Project: 210570
Type Work: Widening
Descp: 1-20 FM BELAIR RDICOLUMBIA CO TO
RIVERWATCH PARKWAY/RICHMOND
Lanes: Exist. 4 Prop. 6
Length: 5.01
TIP#: NHS-6
Project: 221800. Type Work: Widening
Descp: SR 104 FM MP 11.95 SE/CR 80 TO NW OF SR 47 @
POLLARDS CORNER Lanes: Exist. 2 Prop. 4
Length: 3.30
TfP#:
Project: 221805. Type Work: Widening
Descp: SR 104 FM MP 8.95 S OF CR 515 TO MP 11.95 S OF
CR80 Lanes: Exist. 2
Prop. 4
Length: 3.00
TIP#: STP-Il
Project: 222140- Type Work: Passing Lanes Descp: SR 47 NB MP 8.33-9.53;SB AND NB 13.48 - 15.18
Lanes: Exist. 2 Prop. 4
Length: .4.18 TIP#:
Project: 227805- Type Work: ATMS/ITS
Descp: ATMS/I-20 COMMUNIC/SURVEILLANCE FM SR
388/COLUMBIA TO SC
Length: 11.72
T/P#: NHS-9
Project: 231350. Type Work: Passing Lanes
Descp: SR 47 SB FRM MP 2.45 NEAR KEG CREEK SOUTH
TO MP 3.88
Lanes: Exist. 2 Prop. 3
Length: 1.43
TfP#:
Project: 231440- Type Work: Widening
Descp: SR 232 FM OLD BELAIR RD/CR 221 TO BELAIR
RD/SR 383
Lanes: Exist. 2 Prop. 4
Length: 1.83
TIP#: STP-l
Project: 231710- Type Work: Median Work Descp: SR 104IWASHINGTON RD FM FLOWING WELLS
RD TO HALALI FARM RD Length: 4.71
TfP#: STP19
Project: 232305. Type Work: Replace Bridge Descp: SR 47@ KEG CREEK 6.9 MI N OF APPLING
Length: 0.24 TfP#:
Project: 232306. Type Work: Replace Bridge Descp: SR 223 @ UCHEE CREEK 2.2 MI NW OF
GROVETOWN Length: 0.22
TfP#: BRM -6
Project: 250470- Type Work: Widening
Descp: OLD PETERSBURG RD/OLD EVANS FM BASTON
RD TO WASHINGTON RD
Lanes: Exist. 2 Prop. 4
Length: 2.55
TIP#: STP5
Phase Fund PE NHS CST Bond
Year Underway
2007
Federal
State
$0 $36,100,000
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Federal $4.636.000
State $1.159.000
Phase PE ROW CST
Fund STP STP STP
Year Underway
2007 After 2007
Federal $2.327.200
State $581.800
Phase Fund PE STP ROW STP CST STP
Year Underway Underway After 2007
Federal
State
Phase Fund CST NHS
Year 2007
Federal $15.520,800
State $3.880.200
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 2007
Federal
$61.600 $942,400
State
$15,400 $235.600
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 After 2007
Federal $97,600
State $24,400
Phase Fund PE STP ROW STP CST STP
Year 2005 After 2007 After 2007
Federal $357.600
State $89,400
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 After 2007
Federal $11,200
$880,000
Federal $11,200
State $2.800
$220.000
State $2,800
Phase Fund PE STP ROW STP ROW STP ROW STP ROW STP CST STP
Year Underway Underway Underway
2005 After 2007 After 2007
Federal $11.844,800
State $2.961,200
Other $0
Other $0
Other $0
Other
Other $0
Other $0 $0
Other $0
Other $0
Other $0 $0
Other $0
Other
$0
Total $36.100.000
Total
$5,795,000
Total
$2.909.000 Total
Total
$19,401.000
Total $77.000
$1,178.000
Total
$122.000 Total
$447.000
Total
$14.000
$1,100,000 Total
$14.000
Total $14,806,000 Page 94of300
..''.')
.~
.t,,',
.'t:
t:
.'t ..''t; .t l
'
.>
.:t:
t;
.'t) .
',
t;
..0~
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aI2QQ5
Columbia
Project: 250560. Type Work: Widening
Descp: DAVIS RD FM SKINNER MILL TO WASHINGTON RD
&1-20 HALF DIAMOND
Lanes: Exist. 2 Prop. 4
Length: 1.60
TlP#: STP-8
Project: 250600. Type Work: Widening
Descp: FLOWING WELLS RD/SR 1017 FM 1-20TO
WASHINGTON RD IN AUGUSTA
Lanes: Exist. 2 Prop. 4
Length: 1.62
TIP#: STP-7
Project: 250620. Type Work: New Construction
Descp: WILLIAM FEW PARKWAY EXTENSION FM SR 104
TO HARDY-MCMANUS RD
Lanes: Exist. 0 Prop. 2
Length: 1.33
TIP#: STP-IO
Phase Fund PE STP ROW Q77 CST STP
Year Underway Underway
2005
Phase Fund PE STP ROW STP CST STP
Year Underway
2005 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
2005 After 2007
Federal
State
$8,231,200 $2,057,800
Federal
$4,360,000 $4,525,600
State
$1,090,000 $1,131,400
Federal $800,000
State $200,000
Other
Total
$0
$10,289,000
Other
$0 $0
Total
$5,450,000 $5,657,000
Other $0
Total $1,000,000
Page 95 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 20/2005
Cook
Project: 0000763 Type Work' Widening Descp: 175FM LOWNDES CO LINE TO SR 37 - PHASE 2
Lanss: Exist. 4 Prop. 6
Length 7.90 TlP#:
Project: 0000784 Type Work: Widening
D#1scp: 175FM SR 37 TO CR 246fKINARD BRIDGE RD
PHASE 2
Lanes:Exist. 4 Pro". 6
Length: 9,30
TIP#:
Project: 0000785 TYfJ8 Work.: Widening
Descp: 1-75FM CR 246fCOQK TO CR 204 IN TIFT CO
PHASE 2
Lanes: Exist.
Prop, 6
Length: 9.80
TIP#:
Project: 0008535 Type Work: Streetscapes Descp: ADEL DOWNTOWN MULTIMODAL PROJECT
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 410520.
Type Work: Widening
Desc;p: 1-76 FM SR 37 TO CR 248/KINARD BRIDGE RD -
PHASE 1 Lanes: Exist. 4
ProP. 6
Length: 9.30
TIP#:
Project: 410530. TYtJ9 Work: WidE!ning Descp: 1-15 FM CR 246 TO TIFT CO LINE PHASE 1
Lanes: Exist.
Prop, 6
Length: 3.9S TIP#:
Project: "10820. Type Work: water Pollution Mitig_ Descp: 175 RJW FOR HEART PINE & CECIL BAY
WETLANDS _MITIGATION Length: 0.00
TIP1/-.
project: 432015- Type Worle Replace Bridge DesCP: SR 7/US 41 @GIDDENSMILLCREEKINNORTH
ADEL
Length' 0.21
TIP#.-
Project: 442881
Type Work' Replace Bridge
OeSCp: SR 37@WITHLACOOCHEE RIVER & OVERFLOW
AT COOKBERRIEN CO LN
Length: 0.95
TIPtI.-
Phase Fund
PE NHS
ROW Bond
CST Bond
Ym 2005
After 2007 After 2007
Phase Fund
PE NHS
ROW Bond
CST Bond
Vear
2005
After 2007 After 2007
Phase Fund
PE NHS ROW NHS CST Bond
Y.., 2005 2007 After 2007
Phase Fund
CST STP
Y. .,
LUMP
Federal $400,000
Fedoral
$400,000
t=J.r.1 $400,000 $3,4517,600
Foderal $350,400
State $100,000
St.te $100,000
State $100,000 $874,400
St.te
$0
pm.se Fund
PE NHS PE NHS CST Bond
Y. ., Underway
2005 2006
Phase Fund
PE NHS PE NHS CST Bond
Y. ., Underway
2005 2007
Phase Fund
ROW NHS
Y. . , 2006
Federal
Stare
$400,000 $0
$100,000 $55,304,000
Federal
State
$400.000 $0
$100,000 $29,152,000
F-ederal $2"0,000
Statlt $60,000
Phase Fund
PE Bridge
ROW Bridge
CST Bridge
Y. ., Underway
2006 After zo07
Federal $24,000
Phase Fund
PE Bridge
ROW Bridge
CST Bridge
Y. .r
Underway Underway
2005
Federal 53,852,000
Statlt $6,000
erere $963,000
Other $0
To'" $500,000
Other $0
Total
$500,000
Oth...
$0 $0
Tot1 $500,000 $4,312,000
Oth ...
$87,600
To'" $438,000
Other
$0 $0
To,.,
$500,000 $55,304,000
Other
SO $0
To. .,
$500,000 $29,152,000
Other $0
Toto' $300,000
Oth ...
$0
To,.,
$30.000
Oth ...
To'"
$0
$4,815,000
P8ge 96 of 300
~
~
"
"-
~
<-
~ ~
l. l. L
l.
\.. i... L
l. l.
i..
l.. l.. L l \..
~
~ ~ \, ~
"-
<,
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/712005
Coweta
Project: 0000$01 Type Work": BicyclefPed. FaCility
Descp: SENOIA MULT1USE TRAIL FROM CITY PARK TO
BALL FIELD Length" 1.10
TlP#' CW-ARBPO
Project: 0000818 Type Work: nuersecuon Improvemenl
Descp: SR 16 AT SR 74/SR 85 IN SENOIA
LUMP SUM PROJECT
Length: 057 TJP#" AR-IS7
Project: 0000930 Type Work: tmereecuon Impruvement Descp: SR 141 US 29 AT CR 552IWELDON ROAD
LUMP SUM PROJECT
Length: 0.49 T/P#" AR-157
Project: 0001357 Type Worlc: Replace Bridge
Descp: SR 16/US 27 AlT@CHATTAHOOCHEERIVERAT
COWETA CO LINE
Length: 120
TlP#: (W.OlS
Project: 0002180 Type Work: Railroad CrO$$ing
Descp: CS 706JE WASHINGTON 5T IN NEWNAN @ CSX #
050427N
Length: 040
LUMP SUM PROJECT
TJP#: ARIS6
Project: 00022.7 Type Work: Sidewalk$
Descp: GREENVILLE STREET CORRIDOR IMPROVEMENT
~ROJECT
LenQth: 0.00
LUMP SUM PROJECT
TlP#: AR384ABC
Project: 0003161 Type Work: WH;lening Descp: 1-85FROM SR 14JUS 29 TO SR 34
Lanes: Exist. 4 Prop. 6
Lenglh: 11.44 TIP#: CWAROOI
Project: 0003783 Type Work: Intersection. Improvement
Descp: SR 1eIWELLS STREET AT CR 157IBROAD ST & LUTHER BAILEY ROAD Length' 0.32
LUMP SUM PROJECT
TlP#:
Project: 0004408 Type WO/1(: rntereectcn Improvement Descp: SR 16@WITCHERIGLOVER;SR
154@HAMMOCK&VAUGHN;US 29@2 LOC Length: 1.20
TJP#: CW.033A
Pr0j9CI: 0004-407 Type Work: Minor Widen &. Resurl Descp: LOWER FAYETTEVILLE ROAD FROM GRIESON
TRAIL TO FISCHER ROAD Length: 5.00
TlP#: CW-OJ2
Project: 0004721 Type Worle lntersectlon Improvement Descp: SR 54 AT SR 154 & CR 55/MCINTOSH TRAIL IN
SHARPSBURG Length: 0.45
LUMP SUM PROJECT
TJP#:
Phase Fund
PE Local ROW Local CST CMAQ
Year
LOCL
toct.
2006
Phase Fund PE STP ROW STP CST STP
Y..,
Underway LUMP LUMP
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Phase PE ROW CST
Fund Bridge Bridge Bridge
Yea'
Underway
2005
2006
Phase Func1 CST STP
Yea'
LUMP
Phas. Fund CST STP
Year LUMP
Phase Fund
PE NHS
CST Bond
Year underway
200e
Phase PE ROW CST
Fund STP Local STP
Yea'
Underway LOCL LUMP
Phase PE ROW CST
Fund Bond Local Bond
Year Underway
LOCL 2006
Phase Fund CST RRBS
Y. .,
2005
Philse Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Federal
$0 $0 $270.180
Federal
$71,100 $253.800
Federa'
$0 $342.900
Federal
$40,000 $2,556.000
Federal $100,000
Stare $0 $0 $0
Other $0 $0
$68,400
State
$7,900 $28.200
Other
$0 $0
State
$0 $38,100
Other
$300,000 $0
State
$10,000 $639,000
Other
$0 $0
Slale
$0
Other
$0
Fede,,' $623,152
Stare $0
Other $155,7B8
Fedfll'8J
State
$0 $33,000,000
Other
$0
Federa'
$0
S232,200
Srate
$0
$25,800
Other
$37.600 $0
Fed_
$0
So
State
$0
$1,800,000
Othe,
S100,000
$0
Feder" $0
St.t. $6,000.000
Orner
$0
Federal
$123,750 $393,300
Stare
$13,750 $43,700
orn",
$0 $0
Tor.I $0 $0
$338,580
Tota'
$79,000 $282,000
Total $300,000 $381.000
Tot.l $50,000
$3,195.000
Tota' $100,000
rotal
snB,940
Total $33,000.000
To,.t $37,600
$258,000
To'" $100,000 $1,800.000
To,.,
$6,000.000
rotal
$137,500 $437,000
Page 97 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2005
Coweta
Project: 0005191 Type Work: Intersection Improvement
Descp: SR 54 @ STEWART ROAD/REESE ROAD;
MCINTOSH TRAIL
Length: 0.40
TIP#: CW-0338
Project: 0006293 Type Work: Intersection Improvement
Descp: SR 154@ OLD HWY 16; SR 16 @ PINE RD; SR 54
@GORDONRD
Lenglh: 1.20
TlP#: CW-033C
Project: 0006453 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ 4 LOC ALONG SR 14 IN COWETA COUNTY Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006460 Type Work: Barriers
Descp: 1-85 NOISE WALLS FROM SR 154 TO
COLLINSWORTH RD
Length: 5.11
TlP#: CW-AR-006
Project: 0006591 Type Work: Streetscapes Descp: SHARPSBURG SIDEWALKS & STREETSCAPE
LUMP SUM PROJECT
Lenglh: 0.00 TlP#:
Project: 0006877 Type Work: Widening Descp: SR 16 FM 1-85 TO US 29
Lanes: Exist. 2 Prop. 4
Length: 0.50 TIP#: CW-034
Project: 311790. Type Work: Ramp
Descp: 1-85/SR 34 RAMP RECONSTRUCTION SOUTHEAST
QUADRANT
Lanes: Exist. 0 Prop. 1
Length: 1.40
TlP#: CW-AR-007
Project: 322400. Type Work: Widening
Descp: SR 34 BY/NEW FM CR 70/HOS RD TO JEFFERSON
PKWY INC RR BRIDGE
Lanes: Exist. 2 Prop. 4
Length: 2.63
TlP#: CW-006A
Project: 322405. Type Work: Widening
Descp: SR 34 BYP/NEWNAN FM JEFFERSON PKWY TO
SR 34
Lanes: Exist. 2 Prop. 4
Length: 0.60
TIP#: CW-0068
Project: 322800. Type Worle New Construction
Descp: NEWNAN SOUTHWEST BYPASS FM SR 34 TO SR
14ATSR16
Lanes: Exist. 0 Prop. 2
Length: 6.20
TlP#: CW-007
Project: 333175. Type Work: Replace Bridge Descp: SR 74 @ CSX RAILROAD (639456G) 3.4 MI S OF
SENOIA Length: 0.29
TlP#: CW-029
Phase Fund
PE
Bond
ROW Local
CST Bond
Year Underway
LOCL 2006
Phase Fund
PE
Bond
ROW Local
CST Bond
Year Underway
LOCL 2006
Phase Fund
PE
STP
'CST STP
Year Underway
LUMP
Phase Fund
PE
Q02
CST NHS
Year 2005 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL 2007
Phase Fund
PE
1M
ROW 1M
ROW 1M
CST Bond
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2005 2006
Year Underway
2006 2007
Phase Fund ROW STP CST STP
Year 2006 2007
Phase Fund
PE
Local
PE
STP
ROW Local
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year LOCL Underway LOCL 2007
Year Underway
2005 2006
Federal
$0 $0
State
$0 $650,000
Other
$100,000 $0
Federal
$0 $0
State
$0 $1,500,000
Other
$100,000 $0
Federal $240,000
State $60,000
Other $0
Federal $745,575
State $186,394
Other $0
Federal $312,000
State $0
Other $78,000
Federal $0 $0
$640,000
Federal
State $0 $0 $0
Other $56,000 $450,000 $160.000
State
Other
$1.159.200 $0
Federal
$582.240 $3,308.000
$289,800 $9.962,000
State
$145,560 $827,000
Federal $1.200.000 $2,000,000
State $300,000 $500.000
$0 $0 Other
$0 $0
Other $0 $0
Federal $0
$0 $5.360.000
Federal
$63.200 $1,121.600
State $0
Other $470.000
$0 $0
State
$970,000 $1.340,000
Other
$15.800
$0
$280,400
$0
Total $100,000 $650,000
Total $100,000 $1.500.000
Total $300,000
Total $931,969
Total $390,000
Total $56.000 $450,000 $800,000
Total
$1,449.000 $9.962.000
Total $727.800 $4.135.000
Total $1.500.000 $2.500.000
Total $470,000 $970.000 $6,700.000 Total $79.000 $1,402.000
..,'
Page 98 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2QQ5
Coweta
Project: 333176- Type Work: Replace Bridge
Descp: SR 74@ SOUTHERN RAILROAD (718831X) CITY
OF SENOIA
Length: 0.27
T1P#: CW-028
Project: 333177. Type Work: Replace Bridge Descp: SR 74 @ LINE CREEK COWETA-FAYETTE CO LINE
Length: 0.44 TIP#: CW-031
Project: 343375. Type Work: Replace Bridge Descp: SR 54 @ SHOAL CREEK 4.4 MI N OF TURIN
Length: 0.23 T1P#: CW-030
Project: MOO2434 Type Work: Concrete Rehab
Descp: 1-85FM COLLINSWORTH RD/COWETA TO SR
74/FULTON
Length: 491
LUMP SUM PROJECT
T1P#: Lump
Phase PE ROW CST CST
Fund Bridge Bridge Bridge STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase PE ROW CST CST
Fund Bridge Bridge Bridge STP
Phase Fund CST 1M
Year Underway
2007 After 2007 After 2007
Year Underway
2006 2007 2007
Year Underway
2007 After 2007 After 2007
Year LUMP
Federal $8,000
Federal $118,400 $844,800 $1,364,800 Federal
$10,400
Federal $12,960,000
State $2,000
State $29,600 $211,200 $341,200 State
$2,600
State $1,440,000
Other $0
Total $10,000
Other
$0 $0 $0 Other
$0
Total
$148,000 $1,056,000 $1,706,000
Total
$13,000
Other $0
Total $14,400,000
Page 99 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2flI2QQ5
Crawford
Project: 0006021 Type Work: Turn Lanes
Descp: SR 221US 60 FM EXISTING 4 LANE TO CULPEPPER
CREEK
Lanes: Exist. 2 Prop. 3
Length: 1.65
TIP#:
Phase Fund ROW STP CST STP
Year 2007 After 2007
Federal $200,000
State $50,000
Other
$0
Total $250,000
Page 100of300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2a/2QQ5
Crisp
Project: 0002229 Type Work: Replace Bridge Descp: CR 71/AMBOY ROAD @ LIME CREEK 2 MI E OF
ARABI Length: 0.27
TlP#:
Project: 0003385 Type Work: Water Pollution Mitig.
Descp: 1-75STREAM MITIGATION IN TIFT; TURNER &
CRISP COUNTIES
Length: 0.00
TlP#:
Project: 410260- Type Work: Widening Descp: 1-75FM SR 300 TO DOOL Y COUNTY LINE
Lanes: Exist. 4 Prop. 6
Length: 6.90 TlP#:
Project: 431130- Type Work: Replace Bridge
Descp: CR 357/HAWPOND ROAD @ DEEP CREEK 5.8 MI E
OF ARABI
Length: 0.25
TlP#:
Project: 431132- Type Work: Replace Bridge
Descp: CR 357/HAWPOND ROAD @ REEDY BRANCH 4.9
MI EOFARABI
Length: 0.20
TlP#:
Project: 442660- Type Work: New Construction Descp: SR 90/CR 366 RELOCATION FROM SOUTH OF CR
365 TO SR 257 Length: 2.80
TIP#:
Project: 450550- Type Work: Bridges Descp: 24TH AVENUE/SR 987 GRADE SEPARATION AT
NORFOLK SOUTHERN RR Length: 0.34
TIP#:
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2006
Phase Fund CST NHS
Year 2007
Federal
$0 $231,200
Federal $145,600
State
Other
$0 $57,800
$1,998,000 $0
State $36,400
Other $0
Phase Fund PE NHS ROW NHS ROW HPP CST Bond
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway Underway Underway
2006
Year Underway
LOCL 2007
Federal
State
$0 Federal
$21,217,000 State
$0 $311,200
$0 $77,800
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2007
Federal
$0 $199,200
State
$0 $49,800
Phase PE ROW CST
Fund STP STP STP
Year Underway
2007 After 2007
Federal $201,600
State $50,400
Phase PE ROW CST
Fund STP STP STP
Year Underway Underway
2005
Federal
State
$5,352,000
$1,338,000
Other
$0 Other
$0 $0 Other $0 $0 Other $0
Other
$0
Total $1,998,000
$289,000 Total $182,000
Total
$21,217,000 Total $0 $389,000 Total $0 $249,000 Total $252,000
Total
$6,690,000
Page 101 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Dade
Project: 0006280 Type Work: New Construction
Descp: ACCESS ROAD FM SOUTH INDUSTRIAL BLVD TO
PINEY GROVE ROAD Lanes: Exist. 0 Prop. 2
Length: 0.80
T1P#:
Project: 621230- Type Work: Widening
Descp: SR 136 FM CR 52 TO SR 58/US 11{INCLUDE INT
W/I59} Lanes: Exist. 2
Prop. 5
Length: 0.80
T1P#:
Project: M002386 Type Work: Bridge Painting
Descp: PROPOSED BRIDGE PAINTING AT SEV LOCS IN BARTOWIDADEIGORDON Length: 0.00
LUMP SUM PROJECT
T1P#:
Phase Fund
PE
APD
ROW Local
CST APD
Year Underway
LOCL 2005
Phase Fund PE STP ROW STP CST STP
Year Underway
2006 After 2007
Phase Fund CST 1M
Year LUMP
Federal $0
$1,000,000
Federal $328,000
Federal $286,560
State $0 $0
State $82,000
State $31,840
Other
$50,000 $250,000
Other
$0
Total $50,000 $1,250,000
Total $410,000
Other $0
Total $318,400
Page 102 of 300
.'...'''
STATE TRANSPORTA nON IMPROVEMENT PROGRAM zaL2QQ5
Dawson
Project: 0001170 Type Work: Intersection Improvement Descp: LUMPKIN CAMPGROUND ROADICR 223 AT
DAWSON FOREST ROADICR 252 Length: 0,20 TlP#:
Project: 132790- Type Work: Interchange Descp: SR 400 INTERCHANGE AT SR 53/CORR A1
Length: 2,67 TlP#:
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2005
Federal
$0 $180,800
State
$0 $45,200
Phase PE ROW CST
Fund APD App Dev AppDev
Year Underway
2005 2006
Federal
$1,027,200 $15,069,600
State
$256,800 $3,767,400
Other
$81,000 $0
Total
$81.000 $226,000
Other
$0 $0
Total
$1,284,000 $18,837,000
Page 103 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aI2QQ5
Decatur
Project: MOO2968 Type Work: Resurface & Maintenance
Descp: SR 97 FM SR 1 BUS/US 27 TO SR 311/E RIVER RD
IN BAINBRIDGE
Length: 0.72
LUMP SUM PROJECT
T/P#:
Project: MOO2971 Type Work: Resurface & Maintenance
Descp: SR 38 FM WEST OF COLLEGE RD-WHIGHAM
DAIRY RD TO GRADY CO LN Length: 10.08
LUMP SUM PROJECT
TlP#:
Phase Fund CST STP
Phase Fund CST STP
Year LUMP
Year LUMP
Federal $72,000
State $18,000
Federal $1,740,000
State $435,000
Other
$0
Total $90,000
Other
$0
Total $2,175,000
Page 104 of 300
.....'''''
STATE TRANSPORTA nON IMPROVEMENT PROGRAM za/ZOO5
Dekalb
Project: 0000608 Type Work: Sidewalks Descp: MEMORIAL DR SIDEWALKS FM MORELAND
AVE/SR 42 TO CANDLER RD Length: 3.30
TIP#: AT-AR-llPI2
Project: 0000715 Type Work: HOV Lanes
Descp: 1-20 FROM 1-285 EAST TO EVANS MILL ROAD ADD
2 HOV LANES
Lanes: Exist. a Prop. 2
Length: 7.40
TlP#: AR-H-250
Project: 0000949 Type Work: New Construction
Descp: PERIMETER CENTER PKWY EXT OVR 1-285 FM
HAMMOND TO LAKE HEARN
Lanes: Exist. 0 Prop. 4
Length: 0.40
TlP#: DK-215A&1l
Project: 0001758 Type Work: HOV Lanes
Descp: 1-285 FM 1-75/COBB THRU FULTON TO
1-85/DEKALB FOR HOV Lanes: Exist. 10 Prop. 12
Lenglh: 13.12
TlP#: ARH-300A
Project: 0001791 Type Work: New Construction
Descp: LITHONIA IND BLVD EXT; PH2 FM ROGERS LAKE
TO ROCK CHPLlSR124 Lanes: Exist. 0 Prop. 4
Length: 1.13
TIP#: DK-270C
Project: 0001814 Type Work: Railroad Crossing
Descp: MONTREAL RD/CR 1130 GRADE SEPARATION AT
CSX RR
Length: 0.40
TlP#: DK-275
Project: 0002404 Type Work: Sidewalks
Descp: SR 8 FROM MORELAND AVE TO EAST OF
EASTLAND DR
Length: 4.10
TlP#: DKAR-BP06
Project: 0002405 Type Work: Sidewalks
Descp: SR 10/MEMORIAL DR. FROM MOUNTAIN DR. TO
GOLDSMITH ROAD
Length: 4.92
TIP#: DK-AR-BP05
Project: 0002407 Type Work: Sidewalks Descp: SR 421BRIARCLIFF FM PONCE DE LEON AVE TO
NO, DRUID HILLS RD Length: 4.40
TlP#: DK-AR-llP05
Project: 0002410 Type Work: Sidewalks Descp: SR 141 FROM MCGRAW DR./MP 3.0 TO N.
PEACHTREE RD.lMP 4.8 Length: 1.80
TlP#: DK-AR-llP05
Project: 0002411 Type Work: Sidewalks
Descp: SR 154 FROM COLUMBIA DRIVE TO KENSINGTON
ROAD
Length: 1.58
TlP#: DK-AR-llP05
Phase PE ROW CST
Fund Local Local CMAQ
Year LOCL LOCL 2006
Federal $0 $0
$409,600
State $0 $0 $0
Phase Fund
PE
NHS
ROW Bond
CST Bond
Year 2005 After 2007 After 2007
Federal $7,040,000
State $1,760,000
Phase Fund
PE
HPP
ROW Bond
CST NHS
Year Underway
2004 2005
Federal
$0 $14,056,800
State
$8,000,000 $3,514,200
Phase Fund
PE
Bond
PE
NHS
PE
NHS
PE
NHS
ROW Bond
CST NHS
Phase Fund
ROW 4221
CST Bond
Year After 2007 Underway
2006 2007 After 2007 After 2007 Year 2005 2005
Federal
State
$4,000,000 $4,000,000
$1,000.000 $1,000.000
Federal $0 $0
State $3,165.000 $7,165,000
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2006
Federal
$550,400 $4,224.000
State
$137,600 $1,056,000
Phase Fund
PE
STP
ROW Local
CST STP
Year 2006 LOCL After 2007
Federal $73,600 $0
State $18,400
$0
Phase PE ROW CST
Fund STP STP STP
Year 2005 2007 After 2007
Federal $160,000 $480,000
State $40,000 $120,000
Phase PE ROW CST
Fund STP Local STP
Year 2006 LOCL After 2007
Federal $79,200 $0
State $19,800
$0
Phase Fund
PE
STP
CST STP
Year 2007 After 2007
Federal $64,800
State $16.200
Phase Fund
PE
STP
CST STP
Year 2007 After 2007
Federal $28,800
State $7.200
Other $0 $0
$102,400
Other $0
Other $0 $0
Other
$0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Total $0 $0
$512,000
Total $8,800,000
Total $8.000.000 $17 ,571,000
Total
$5.000.000 $5.000,000
Total $3,165,000 $7,165,000
Total $688,000 $5,280,000
Total $92,000
$0
Total $200,000 $600,000
Total $99.000 $0
Total $81,000
Total $36,000
Page 105 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
zaJZOO5
Dekalb
Project: 0002412 Type Work: Sidewalks Descp: SR 155 FM SNAPFINGER RD/CR 5196 TO
CANDLER RD@ FLAT SHOALS Length: 4.90
TIP#: DKARBP05
Project: 0002414 Type Work: Sidewalks
Descp: SR 236 FROM LAWRENCEVILLE HWY TO COWAN
ROAD
Length: 0.19
TlP#: DK-AR-BP05
Project: 0002415 Type Work: Sidewalks Descp: SR 260 FROM CANDLER ROAD TO COVINGTON
HWY Length: 4.10
TlP#: DK032
Project: 0002669 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS
LOCATIONS IN DEKALB CO Length: 0.00
TlP#: DK-344A
Project: 0002754 Type Work: ATMS/ITS
Descp: ATMS:I285 SURVEIL FM 1-75/CLAYTON NE THRU
FULTN TO 1-20/DEK
Length: 11.45
TlP#: AR-28\
Project: 0002799 Type Work: Landscaping Descp: CHAMBLEE-DUNWOODY RD FM
CLAIRVIEW/CUMBERLAND TO BUFORD HWY Length: 0.40
LUMP SUM PROJECT
TlP#: AR-384ABC
Project: 0002800 Type Work: Intersection Improvement Descp: SR 421US 23/MORELAND AVE @ SR 42
CONN/FREEDOM PARKWAY Length: 0.16
LUMP SUM PROJECT
TIP#: AR-118
Project: 0002851 Type Work: Sidewalks
Descp: CHAMBLEE-TUCKER PEDESTRIAN CORRIDOR IN CHAMBLEE(LCI PROJECT) Length: 0.26
LUMP SUM PROJECT
TlP#: DK-AR-223
Project: 0002852 Type Work: Sidewalks Descp: HOOD AVENUE PEDESTRIAN CORRIDOR IN
CHAMBLEE (LCI PROJECT) Length: 0.25
LUMP SUM PROJECT
TlP#: DK-AR-224
Project: 0002853 Type Work: Sidewalks Descp: P'TREE IND BLVD PEDESTRIAN CORRIDOR IN
CHAMBLEE(LCI PROJECT) Length: 0.57
LUMP SUM PROJECT
TIP#: DK-AR-225A
Project: 0002854 Type Work: Sidewalks Descp: WATKINS AVE PEDESTRIAN CORRIDOR IN
CHAMBLEE(LCI PROJECT) Length: 0.00
LUMP SUM PROJECT
TlP#: DK-AR-226A
Phase Fund PE STP ROW STP CST STP
Year 2007 After 2007 After 2007
Phase Fund PE STP ROW Local CST STP
Year 2007 LOCL After 2007
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2007
Phase Fund
PE
STP
CST STP
Year 2005 2006
Phase Fund CST Bond
Year 2005
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Phase Fund ROW Local CST STP
Year LOCL Underway
Federal $48,000
State $12,000
Other $0
Federal $8,000 $0
State $2,000 $0
Other $0 $0
Federal
$0 $1,476,000
Federal $2,000,000 $2,574,000
State
Other
$0 $369,000
$3,919,000 $0
State $500,000 $644,000
Other $0 $0
Federal $0
State $12,758,000
Other $0
Federal $0 $0
$400,000
Federal
$0 $116,360
Federal
$0 $162,400
Federal
$0 $341,600
Federal
$0 $146,400
Federal $0
State $0 $0 $0
Other $0 $0
$100,000
State
$0 $12,929
Other
$0 $0
State
$0 $0
Other
$0 $40,600
State
$0 $0
Other
$0 $85,400
State
$0 $0
Other
$0 $36.600
State $0
Other $0
Total
$60,000
Total $10,000
$0
Total
$3,919,000
$1,845,000
Total $2,500,000
$3,218,000
Total
$12,758,000
Total $0
$0
$500,000
Total
$0 $129,289
Total
$0 $203,000 Total
$0 $427,000
Total
$0
$183,000
Total
$0
Page 106 of300
.....,''''
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM za/ZQQ5
Dekalb
Project: 0002855 Type Work: Sidewalks
Descp: PTREE/MALONE ST PEDESTRIAN CORRIDOR IN
CHAMBLEE(LCI PROJ)
Length: 0.00
LUMP SUM PROJECT
TIP#: DK-AR-227
Project: 0002856 Type Work: Sidewalks
Descp: REVITALIZE DECATUR MARTA PLAZA AREA PH
1&2(LCI PROJECT)
Length: 0.00
LUMP SUM PROJECT
TIP#: DK-AR-228A
Project: 0002902 Type Work: Sidewalks Descp: SR 13 FROM NORTH DRUID HILLS RD TO
CHAMBLEE TUCKER RD Length: 4.72
TlP#: DK-324C
Project: 0002903 Type Work: Sidewalks Descp: SR 155/CLAIRMONT RD FROM NORTH DRUID
HILLS RD TO BUFORD HWY Length: 3.35
TlP#: DK-AR-BP05
Project: 0002904 Type Work: Sidewalks
Descp: SR 236/LAVISTA RD FM CHESHIRE BR RD/FL TN
TO BRIARCLIFF RD/DE
Length: 1.62
TlP#: DKARBP05
Project: 0002905 Type Work: Sidewalks Descp: SR 236/LAVISTA RD FM HAROBI RD TO
NORTHLAKE PKWY Length: 1.07
TlP#: DKARBP05
Project: 0002908 Type Work: Sidewalks
Descp: ROCKBRIDGE FROM STN. MTN.lLlTHONIA RD TO
MEMORIAL DR
Length: 5.91
TlP#: DK-AR-BP04
Projecl: 0003102 Type Work: Miscellaneous Improvement Descp: SR 155/CANDLER ROAD MAJOR ARTERIAL
ENHANCEMENTSPHASE2 Length: 3.73
TlP#: DK-268B
Project: 0003166 Type Work: HOV Lanes
Descp: 1-20FM EVANS MILL RD/DEKALB TO SALEM
RDIROCKDALE HOV LANES
Lanes: Exist. 6 Prop. 8
Length: 9.73
TlP#: AR-H-25IA
Project: 0003534 Type Work: Transit Projects
Descp: 1-265 FROM CUMBERLAND TO PERIMETER
CENTER TRANSIT
Length: 9.37
TlP#: AR900C
Project: 0003773 Type Work: Barriers
Descp: US 76/STONE MOUNTAIN FREEWY FM SCOTT BLVD TO EAST PARK PLACE Length: 9.56
LUMP SUM PROJECT
TIP#:
Phase Fund ROW Local CST STP
Phase Fund
PE
STP
ROW Local
CST STP
Phase PE ROW CST
Fund STP STP STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
HPP
ROW Local
CST HPP
Phase PE PE ROW CST
Fund NHS Bond NHS NHS
Phase Fund
PE
NHS
ROW Bond
CST Bond
CST Bond
Phase Fund
PE
STP
CST STP
Year LOCL Underway
Year Underway
LOCL LUMP
Year 2007 After 2007 After 2007
Year 2006 2007 After 2007
Year 2006 2007 After 2007
Year 2006 2007 After 2007
Year 2007 After 2007 After 2007
Year Underway
LOCL 2007
Year After 2007
2007 After 2007 After 2007
Year 2007 After 2007 After 2007 After 2007
Year Underway
LUMP
Federal $0
State $0
Federal
$0 $1,600,600
Federal $140,000
State
$0 $0
State $0
Federal $64,000
$120,000
State $16,000 $30,000
Federal $16,000 $46,000
State $4,000
$12,000
Federal $24,000 $72,000
State $6,000
$16.000
Federal $106,600
State $27,200
Federal
$0 $5,916,400
State
$0 $1,479.600
Federal $0
State $7,100.000
Federal $3,200,000
State $600,000
Federal $1,350,000
State $150.000
Other $0
Other $0
$450,200 Other $35,000
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0 $0
Other $0
Other $0
Other $0
Total $0
Total $0
$2,251,000 Total $175,000
Total $60,000 $150,000
Total $20.000 $60,000
Total $30,000 $90,000
Total $136,000
Total $0
$7.398.000 Total
$7.100.000
Total $4,000,000
Total $1,500,000
Page 107 of 300
STATE TRANSPORTATlON IMPROVEMENT PROGRAM
zat2QQ5
Dekalb
Project: 0003899 Type Work: Landscaping Descp: LANDSCAPING ON 120 IN DEKALB COUNTY
LUMP SUM PROJECT
Length: 0.00 TlP#: AR-124
Project: 0004408 Type Work: Intersection Improvement
Desct ASHFORD DUNWOODY ROAD AT PERIMETER
CENTER NORTH
Length: 0.40
TlP#: OK300
Project: 0004411 Type Work: Intersection Improvement
Descp: ASHFORD DUNWOODY ROAD AT ASHFORD
PARKWAY PHASE 1
Length: 0.40
TIP#: OK-303
Project: 0004412 Type Work: Intersection Improvement
Descp: ASHFORD DUNWOODY ROAD AT ASHFORD
PARKWAY (SOUTH)
Length: 0.40
TlP#: OK304
Project: 0004414 Type Work: Intersection Improvement
Descp: ASHFORD DUNWOODY ROAD AT MOUNT
VERNON HIGHWAY
Length: 0.20
TlP#: OK-306
Project: 0004415 Type Work: Intersection Improvement Descp: PERIMETER CENTER PARKWAY AT PERIMETER
MALL ENTRANCE Length: 0.40
TIP#: OK-307
Project: 0004416 Type Work: Intersection Improvement
Descp: PERIMETER CENTER WEST AT PERIMETER
CENTER PARKWAY
Length: 0.40
TlP#: OK-308
Project: 0004417 Type Work: Intersection Improvement Descp: PERIMETER CENTER WEST AT BELL SOUTH
ENTRANCE Length: 0.20
TIP#: OK309
Project: 0004418 Type Work: Intersection Improvement Descp: PERIMETER CENTER WEST AT PERIMETER MALL
ENTRANCE Length: 0.40
TIP#: OK-310
Project: 0004419 Type Work: Intersection Improvement Descp: PERIMETER CENTER WEST AT MEADOW LANE
Length: 0.20
TlP#: OK-311
Project: 0004420 Type Work: Intersection Improvement Descp: ASHFORD DUNWOODY ROAD AT ASHFORD
CENTER Length: 0.40
TlP#: OK-312
Phase Fund CST STP
Phase PE ROW CST
Fund Local Bond Bond
Phase Fund PE Local ROW Bond CST Bond
Phase Fund PE Local ROW Bond CST Bond
Phase PE ROW CST
Fund Local Bond Bond
Phase PE ROW CST
Fund Local Bond Bond
Phase Fund PE Local ROW Bond CST Bond
Phase Fund PE Local ROW Bond CST Bond
Phase Fund PE Local ROW Bond CST Bond
Phase Fund PE Local ROW Bond CST Bond
Phase PE ROW CST
Fund Local Bond Bond
Year LUMP
Year LOCL 2005 2005
Year LOCL 2006 2006
Year LOCL 2006 2006
Year LOCL 2006 2006
Year LOCL 2007 2007
Year LOCL 2005 2005
Year LOCL 2005 2005
Year LOCL 2005 2005
Year LOCL 2005 2005
Year LOCL 2006. 2006
Federal $449,600
State $112,400
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
State $0
$40,000 $392,800
State $56,240 $40,000 $500,000
State $56,240 $40,000 $500,000
State $50,000 $40,000 $500,000
State $50,000 $40,000 $460,000
State $0
$40,000 $460,000
State $0
$40,000 $500,000
State $0
$40,000 $500.000
State $0
$40,000 $460,000
State $66,240 $30,000 $500,000
Other $0
Other $50,000 $10,000 $98,200
Other $14,060 $10,000 $125,000
Other $14,060 $10,000 $125,000
Other $12,500 $10,000 $125,000
Other $12,500 $10,000 $115,000
Other $62,500 $10,000 $115,000
Other $70,300 $10,000 $125,000
Other $62,500 $10,000 $125.000
Other $62,500 $10,000 $115.000
Other $16,560
$7,500 $125,000
Total $562,000
Total $50,000 $50,000 $491,000
Total $70,300 $50,000
$625,000
Total $70,300 $50,000 $625,000
Total $62,500 $50,000 $625,000
Total $62,500 $50,000 $575,000
Total $62,500 $50,000
$575,000
Total $70,300 $50,000 $625,000
Total $62,500 $50,000 $625,000
Total $62,500 $50.000 $575,000
Total $82,800 $37.500
$625,000
Page 108 of 300
..;' ....1:,'
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2flIZOO5
Dekalb
Project: 0004421 Type Work: Intersection Improvement
Descp: ASHFORD DUNWOODY ROAD AT ASHFORD
GABLES
Length: 0.40
T1P#: DK-313
Project: 0004422 Type Work: Intersection Improvement Descp: ASHFORD DUNWOODY ROAD AT RAVINIA DRIVE
Length: 0.40 T1P#: DK-314
Project: 0004423 Type Work: Intersection Improvement
Descp: HAMMOND DRIVE AT PERIMETER MALL
ENTRANCE
Length: 0,40
TIP#: DK-315
Project: 0004424 Type Work: Streetscapes Descp: PERIMETER CENTER PARKWAY STREETSCAPE
Length: 0,50 T1P#: DK-316
Project: 0004451 Type Work: Replace Bridge Descp: CLIFTON ROAD AT CSXJRR
Length: 0.40 TIP#: DK-219
Project: 0004478 Type Work: Bicycle/Ped. Facility
Descp: STREETSCAPES @ SEV LOCS ALONG MALONE &
WATKINS - LCI
Length: 0.43
LUMP SUM PROJECT
T1P#: DK AR 229
Project: 0004479 Type Work: Bicycle/Ped. Facility
Descp: MILLER DRIVE FM PEACHTREE RD TO
ABANDONED RAIL SPUR - LCI Length: 0.31
LUMP SUM PROJECT
T1P#: DK AR 230
Project: 0004480 Type Work: Bicycle/Ped. Facility
Descp: PERIMETER CTR PKWY FM HAMMOND DR TO PERIMETER CTR WEST- LCI Length: 0.50
LUMP SUM PROJECT
T1P#: DK-AR-23I
Project: 0004840 Type Work: Bicycle/Ped. Facility Descp: SR 13IBUFORD HWY FROM FULTON CO LINE TO
SHALLOWFORD TERRACE Length: 4.78
TIP#: DK-324A
Project: 0004641 Type Work: Bicycle/Ped. Facility Descp: SR 13IBUFORD HWY FM SHALLOWFORD
TERRACE TO GWINNETT CO LINE Length: 3.50
TlP#: DK-324E
Project: 0004829 Type Work: Sidewalks Descp: PERIMETER CENTER SIDEWALKS EAST OF
ASHFORD DUNWOODY ROAD Length: 0.00
TIP#: DK-318A
Phase PE ROW CST
Fund Local Bond Bond
Phase Fund
PE
Local
ROW Bond
CST Bond
Phase Fund
PE
Local
ROW Bond
CST Bond
Phase Fund
PE
Local
ROW Bond
CST Bond
Phase PE ROW CST
Fund Local Local STP
Phase Fund
PE
STP
CST STP
Year LOCL 2006 2006
Year LOCL 2005 2005
Year LOCL 2005 2005
Year LOCL 2007 2007
Year LOCL LOCL 2007
Year LUMP LUMP
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase PE ROW CST
Fund Local Local Bond
Phase Fund
PE
Local
ROW Local
CST Bond
Phase Fund
PE
Local
CST Bond
Year LOCL LOCL 2005
Year LOCL LOCL 2005
Year LOCL 2005
Federal $0 $0 $0
State $0
$40,000 $500,000
Federal $0 $0 $0
State $0
$40,000 $358,400
Federal $0 $0 $0
State $0
$40,000 $447,000
Federat $0 $0 $0
State $0
$80,000 $2,304,960
Federat $0 $0
$3,522,400
State $0 $0 $0
Federal $117,600 $468,000
State $0 $0
Federal $56,896
State $0
Federal $1,320,000
State $0
Federal $0 $0 $0
State $0 $0
$2,500,000
Federal $0 $0 $0
State $0 $0
$2,500,000
Federal $0 $0
State $0
$196,800
Other $70,300 $10,000 $125,000
Other $62,500 $10,000 $89,600
Other $62,500 $10,000
$0
Other $210,000
$20,000 $576,240
Other $200,000 $500,000 $880,600
Other $29,400 $117,000
Other
$14,224
Other
$326,700
Other $0 $0 $0
Other $0 $0 $0
Other $26,500 $49,200
Total $70,300 $50,000
$625,000
Total $62,500 $50,000 $448,000
Total $62,500 $50,000 $447,000
Total $210,000 $100,000 $2,881,200
Total $200,000 $500,000 $4,403,000
Total $147,000 $585,000
Total
$71,120
Total
$1,646,700
Total $0 $0
$2,500,000
Total $0 $0
$2,500,000
Total $26.500
$246,000
Page 109 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Dekalb
Project: 0004830 Type Work: Sidewalks Descp: PERIMETER CENTER SIDEWALKS WEST OF
ASHFORD DUNWOODY ROAD Length: 0.00
TlP#: OK318B
Project: 0004831 Type Work: Streetscapes Descp: PERIMETER CTR STREETS CAPE FM MT VERNON
TO ASHFORD DUNWOODY Length: 0.95
TIP#: OK-323
Project: 0005875 Type Work: Widening
Descp: CONSTITUTION RD FM MORELAND AVE TO
INTERNATIONAL PARK DR
Lanes: Exist. 2 Prop. 4
Length: 1.61
TlP#: OK-007
Project: 0005905 Type Work: Widening
Descp: PANOLA RD FM THOMPSON MILL RD TO
SNAPFINGER RD Lanes: Exist. 2 Prop. 4
Length: 3.16
TlP#: OK065A
Project: 0005947 Type Work: Bicycle/Ped. Facility Descp: BIKE PATH FM MORELAND TO OLD
RCKBR-HAMBRICK TO STN MTN PK Length: 0.00
TlP#: OK-325
Project: 0005955 Type Work: Widening
Descp: SR 121COVINGTON HIGHWAY FM SR 124 TO LAKE
CAPRI ROAD
Lanes: Exist. 2 Prop. 4
Length: 1.25
TIP#: OK030B
Project: 0006089 Type Work: Railroad Crossing Descp: CR 944/CHESTNUTT STREET @ CSX #279942B
LUMP SUM PROJECT
Length: 0.20 TlP#: lump
Project: 0006254 Type Work: Sidewalks Descp: US 23/SR 13 BUFORD HWY SIDEWALKS
Length: 0.00 TIP#: OK-324B
Project: 0006265 Type Work: Parking Areas
Descp: AVONDALE MARTA STATION PARKING DECK - LCI PROJECT Length: 0.00
LUMP SUM PROJECT
TlP#: OK-AR232
Project: 0006266 Type Work: Streetscapes
Descp: STREETSCAPE ALONG COLLEGE AVE AND SAM STREET-LCIPROJECT Length: 0.00
LUMP SUM PROJECT
TlP#: OK-AR 233
Project: 0006268 Type Work: Intersection Improvement Descp: NORTH DECATUR ROAD IMPROVEMENTS - LCI
PROJECT Length: 0.40
LUMP SUM PROJECT
TlP#: OK-AR 234
Phase Fund PE Local CST Bond
Year LOCL After 2007
Phase Fund PE Local ROW Local CST Bond
Year LOCL LOCL 2005
Phase Fund
PE
STP
CST STP
Year 2007 After 2007
Phase Fund
PE
Local
ROW Local
CST STP
Year 2005 LOCL After 2007
Phase Fund CST STP
Year 2005
Phase Fund
PE
STP
ROW STP
CST STP
Year 2007 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund
PE
Local
CST 064
Year LOCL 2005
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $0
State $0
Federal $0 $0 $0
State $0 $0
$2,406,400
Federal $400,000
State $0
Federal $8,000 $0
State $2,000 $0
Federal $65,200
State $0
Federal $32,000
State $8,000
Federal $135,000
State $0
Federal $0
$625,000
State $0 $0
Federal $2,224,800
State $0
Federal $570,400
State $0
Federal $2,000,000
State $0
Other $13,000
Other $192,000 $150,000 $601,600
Other $100,000
Other $0 $0
Other $16,300
Other $0
Other $0
Other $0
$156,250
Other $556,200
Other $142,600
Other $500,000
Total
$13,000
Total
$192,000
$150,000 $3,008,000 Total
$500,000
Total
$10,000 $0
Total
$81,500 Total
$40,000
Total
$135,000
Total
$0
$781,250
Total
$2,781,000
Total
$713,000
'.Total
$2,500,000
I. Page 110of300
.....,.,1...'''''
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aJ2QQ5
Dekalb
PrOject: 0006269 Type Work: Sidewalks
Descp: LAVISTA RD FM HAROBI DR TO NORTHLAKE
PKWY - LCI PROJECT
Length: 1.07
LUMP SUM PROJECT
TIP#: DK-AR 235
Project: 0006395 Type Work: ATMS/ITS Descp: ATMS/I-285 NE RAMP METERS-HAR FM 1-85 TO
1-20 Length: 12.95
TIP#: AR-437
Project: 0006397 Type Work: ATMS/ITS Descp: ATMS/I-85 N RAMP METERS-HAR FM BUFORD
HWY TO PLEASANT HILL Length: 16.43
TlP#: AR-439
Project: 0006402 Type Work: ATMSIITS
Descp: ATMS/I-20 RAMP METERS-HAR FM THORNTON
RD TO EVANS MILL RD
Length: 30.30
TIP#: AR-444
Project: 0006428 Type Work: Transit Projects
Descp: 1-285 FROM CUMBERLAND TO PERIMETER
TRANSIT CORRIDOR
Length: 9.91
TIP#:
Project: 0006429 Type Work: Transit Projects
Descp: 1-285 FROM CUMBERLAND TO PERIMETER
TRANSIT CORRIDOR
Length: 0.00
TIP#:
Project: 0006459 Type Work: Barriers Descp: 1-285NOISE WALLS FROM 1-20 TO
BOULDERCREST ROAD Length: 4.80
TlP#: DK-AR-247
Project: 0006564 Type Work: Streetscapes
Descp: MAIN STREET TUCKER DOWNTOWN REDEVELOPMENT PROJECT Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006565 Type Work: Multi-use Trail Descp: SOUTH RIVER GREENWAY TRAIL - PHASE I
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006566 Type Work: Streetscapes
Descp: DOWNTOWN LITHONIA STREETSCAPE PROJECT-
PHASE II
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006567 Type Work: Streetscapes
Descp: AVONDALE ESTATES PLAZA BEAUTIFICATION & STREETSCAPE PROJECT Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund
PE
NHS
CST Bond
Year 2005 2006
Phase Fund
PE
NHS
CST Bond
Year 2005 2006
Phase Fund
PE
NHS
CST Bond
Year 2006 2007
Phase PE PE ROW CST
Fund Bond Bond Bond Bond
Phase Fund
PE
Bond
CST Bond
Year 2005 2006 After 2007 After 2007
Year 2007 After 2007
Phase Fund
PE
a02
CST NHS
Year 2005 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Federal $860,000
State $0
Federal $20,000 $0
State $5,000
$1,000,000
Federal $40,000 $0
State $10,000 $3,000,000
Federal $32,000 $0
State $8,000
$2,500,000
Federat $0 $0
State $5,000,000 $20,000,000
Federal $0
State $11,000,000
Federal $477,168
State $119,292
Federal $900,000
State $0
Federal $920,000
State $0
Federal $750,400
State $0
Federal $348,000
State $0
Other $215,000
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $225,000
Other $230,000
Other $187,600
Other $87,000
Total $1,075,000
Total $25,000 $1,000,000
Total $50,000
$3,000,000
Total $40,000 $2,500,000
Total $5,000,000 $20,000,000
Total $11,000,000
Total $596,460
Total $1,125,000
Total $1,150,000
Total $938,000
Total $435,000
Page 111 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Dekalb
Project: 0006568 Type Work: Descp: UPTOWN PINE LAKE
Streetscapes
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006569 Type Work: Streetscapes
Descp: STONE MOUNTAIN MAIN ST DISTRICT STREETSCAPE-PHASEI Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006665 Type Work: Signing
Descp: 1-285WB FM BUFORD HIGHWAY TO PEACHTREE INDUSTRIAL BOULEVARD Length: 1.40
LUMP SUM PROJECT
TIP#:
Project: 0006807 Type Work: ATMS/ITS Descp: PERIMETER CENTER AREA FIBER OPTIC
INTERCONNECTION @ SEV LOCS Length: 0.00
TIP#: DK-334
Project: 0006808 Type Work: ATMSIITS Descp: MOUNTAIN INDUSTRIAL BLVD TRAFFIC SIGNAL
UPGRADE IN DEKALB Length: 6.97
TIP#: DK-335
Project: 0006809 Type Work: ATMSIITS Descp: NORTH DRUID HILLS ROAD TRAFFIC SIGNAL
UPGRADE Length: 0.00
TlP#: DK-336
Project: 0006810 Type Work: ATMS/ITS
Descp: US 29ILAWRENCEVILLE HIGHWAY TRAFFIC
SIGNAL UPGRADE
Length: 12.07
TIP#: DK-337
Project: 0006811 Type Work: Sidewalks
Descp: ASHFORD DUNWOODY ROAD SIDEWALK & BIKE
LANE
Length: 0.00
TlP#: DK-AR-BP04
Project: 0006812 Type Work: Bicycle/Ped. Facility Descp: KENSINGTON ROAD FROM REDAN ROAD TO
MEMORIAL DRIVE Length: 1.29
TlP#: DK-AR-BP04
Project: 0006843 Type Work: Transit Facilities Descp: MARTA- KENSINGTON TRANSIT STATION LCI
IMPLEMENTATION PROJECT Length: 0.00
TIP#: M-AR-28\
Project: 0006847 Type Work: Transit Projects Descp: MEMORIAL DR BUS RAPID TRANSIT
OPERATIONAL ASSISTANCE - 2006 Length: 0.00
TlP#: M-AR-283A
Phase Fund CST STP
Year LUMP
Federal $182,400
State $0
Other $45,600
Phase Fund CST STP
Year LUMP
Federal $900,000
State $0
Other $225,000
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $162,000
State $18,000
Other $0
Phase Fund CST CMAQ
Year 2006
Federal $1,064,000
State $0
Other $266,000
Phase Fund CST CMAQ
Year 2007
Federal $396,000
State $0
Other $99,000
Phase Fund CST CMAQ
Year 2007
Federal $200,800
State $0
Other $50,200
Phase Fund CST CMAQ
Year 2007
Federal $291,200
State $0
Other $72,800
Phase Fund CST STP
Year 2007
Federal $1,336,000
State $0
Other $334,000
Phase Fund CST CMAQ
Year 2007
Federal $400,000
State $0
Other $100,000
Phase Fund CST STP
Year 2007
Federal $128,000
State $0
Other $32,000
Phase Fund CST STP
Year 2006
Federal $15,370,000
State $0
Other $3,842,500
Total
$228,000
Total
$1,125,000
Total
$180,000
Total
$1,330,000
Total
$495,000 Total
$251,000
Total $364,000 Total $1,670,000
Total
$500,000
Total
$160,000
Total
$19,212,500
Page 112of300
.;
t;\
...t1'',
.J >
t, I
.'.,II
.'...
,
tj
.'t;
t,'
~)
..'''.,.t.1'),': .'t!
.\~
.':>
t,
t!
t-i,
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5
Dekalb
Project: 0006851 Type Work: Transit Projects Descp: MEMORIAL DR BUS RAPID TRANSIT
OPERATIONAL ASSISTANCE - 2007 Length: 0.00
TIP#: M-AR-283B
Project: 0006884 Type Work: Sidewalks Descp: SIDEWALKS ALONG 6 CORRIDORS - PHASE I
Length: 0.00 TlP#: DK-320A
Project: 0006888 Type Work: Widening
Descp: CR 627/HAYDEN QUARRY/SIGMAN RD FM
TURNER HILL TO ROCKDALE CO
Lanes: Exist. 2 Prop. 4
Length: 0.67
TIP#: DK-327A
Project: 0006998 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ 18 LOCATIONS IN
DEKALB CO
Length: 0.00
TlP#: DK-344
Project: 0006999 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @31 LOCATIONS IN
DEKALB CO
Length: 0.00
TlP#: DK-344
Project: 0007003 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @32 LOCATIONS IN
DEKALB CO
Length: 0.00
TIP#: DK-344
Project: 0007004 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @36LOCATIONS IN
DEKALB CO
Length: 0.00
TlP#: DK-344
Project: 713280- Type Work: Interchange
Descp: 1-285 @ SR 10/MEMORIAL DR & RELOCATE
GEORGE LUTHER DR Lanes: Exist. 4 Prop. 6
Length: 0.40
TIP#: DK-AR-205
Project: 713320- Type Work: Interchange Descp: 1-285@SR 8/US 29/LAWRENCEVILLE HIGHWAY
Lanes: Exist. 4 Prop. 6
Length: 0.70 TlP#: DK-AR-184
Project: 713405- Type Work: ATMS/ITS
Descp: ATMS/I-285 RAMP METERS-HAR FM 1-75 IN COBB
E TO 1-85IN DEK
Length: 13.17
TIP#: AR-241
Project: 713610- Type Work: Widening
Descp: 1-20FROM COLUMBIA DRIVE EAST TO EVANS
MILL ROAD
Lanes: Exist. 6 Prop. 8
Length: 7.40
TlP#: DK-AR-009A
Phase Fund CST CMAQ
Year 2007
Federal $2,500,000
State $0
Other $625,000
Phase Fund
PE
Local
ROW Local
CST STP
Phase Fund
PE
Local
ROW Local
CST STP
Phase Fund CST STP
Year LOCL LOCL 2007
Year LOCL LOCL 2007
Year 2006
Federal $0 $0
$2,888,000
Federal $0 $0
$1,200,000
Federal $1,501,600
State $0 $0 $0
Other $267,000 $100,000 $722,000
State $0 $0 $0
Other $150,000 $1,200,000 $300,000
State $375,400
Other $0
Phase Fund CST STP
Year 2006
Federa/ $2,657,600
State $664,400
Other $0
Phase Fund CST STP
Year 2006
Federal $2,668,800
State $667.200
Other $0
Phase Fund CST STP
Year 2006
Federal $3,002,400
State $750,600
Other $0
Phase Fund
PE
1M
ROW 1M
CST Bond
Year Underway Underway
2006
Phase Fund
PE
1M
ROW 04M
ROW 1M
CST Bond
Phase Fund
PE
NHS
CST NHS
Year Underway Underway Underway
2006
Year 2005 2006
Federal
State
$0 $19,535.000
Federal
State
$0
Federal $40,000
$1,200,000
$14,798,000
State $10,000 $300,000
Other
$0 Other
$0 Other
$0 $0
Phase Fund ROW NHS ROW NHS CST NHS
Year 2007 After 2007 After 2007
Federal $4,320,000
State $1,080,000
Other $0
Total $3,125,000
Total $267,000 $100,000 $3,610,000
Total $150,000 $1,200.000 $1,500.000 Total $1,877,000
Total $3,322,000
Total $3.336.000
Total $3,753.000
Total
$19,535,000
Total
$14,798.000 Total $50,000
$1,500,000
Total $5,400,000
Page 113 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005
Dekalb
Project: 714000. Type Work: Interchange Descp: 1-285FROM SR 400 TO N SHALLOWFORD RD
Lanes: Exist. 4 Prop. 6
Length: 3.06 TfP#: DK-AR-219
Project: 714085- Type Work: ATMSIITS
Descp: ATMSII-20 COMM/SURVEILLANCE FM 1-285/DEK
TO SR138/SR20/ROCK
Lenglh: 14.93
TIP#: AR-30S
Project: 714095. Type Work: ATMS/ITS
Descp: ATMS/I-675 COMM/SURVEIL FM 1-75/HENRY TO
1-2851DEKALB
Length: 10.32
TfP#: AR-433A&B
Project: 721820- Type Work: Widening
Descp: SNAPFINGER RD FM WESLEY CHAPEL RD TO
FLAT SHOALS PARKWAY
Lanes: Exist. 2 Prop. 4
Length: 1.78
TfP#: DK-OS6
Project: 721940 Type Work: ATMS/ITS Descp: ATMS/ SR 410 COMM/SURVEIL FM
LAWRENCEV'LE HWY TO E PARK PL Length: 8.22
T/P#: AR-471
Project: 731770- Type Work: Miscellaneous Improvement Descp: BUFORD HIGHWAY/SR 13/US 23 FM
SHALLOWFORD TERR. TO 1-285 Length: 2.20
TfP#: DK-324D
Project: 752900- Type Work: Replace Bridge Descp: SR 155/CANDLER RD AT SHOAL CKiREPL
CLVT;TRN LN&REMOVE PED BR Length: 0.20
TfP#: DK-2S0
Project: 752930- Type Work: Replace Bridge
Descp: BOULDERCREST ROAD AT THE SOUTH RIVER
SOUTH OF 1-285
Length: 0.20
TfP#: DK-260
Project: 753035 Type Work: Turn Lanes Descp: EAST PONCE DE LEON/CR 5151 AT HAMBRICK RD
Lanes: Exist. 2 Prop. 3
Length: 0.20 TfP#: DK-246
Project: 753170- Type Work: Miscellaneous Improvement Descp: SR 155/CANDLER ROAD ENHANCEMENTS AT
GLENWOOD RD - PHASE 1 Length: 0.38
TfP#: DK-268A
Project: 753200 Type Work: Miscellaneous Improvement
Descp: SR 154/SR 10/MEMORIAL DRIVE MAJOR ARTERIAL
ENHANCEMENTS
Length: 0.93
TfP#: DK-267
Phase PE ROW ROW CST
Fund 1M 1M 1M 1M
Phase Fund
PE
NHS
CST Bond
Phase Fund
PE
NHS
CST Bond
Phase Fund
PE
STP
ROW Local
CST STP
Phase Fund
PE
NHS
CST Bond
Phase Fund
PE
HPP
CST HPP
Phase Fund ROW STP CST STP
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Phase PE ROW CST
Fund STP Local STP
Phase PE ROW CST
Fund HPP Local HPP
Phase Fund PE HPP ROW Local CST HPP
Year Underway Underway
2007 After 2007
Year 2005 2006
Year 2006 2007
Year Underway
LOCL 2007
Year 2006 2007
Year Underway
2005
Year 2005 2006
Year Underway
LOCL 2006
Year Underway
LOCL 2006
Year Underway
LOCL 2005
Year Underway
LOCL 2005
Federal
State
Other
$96,873,300 $10,363,700
Federal $160,000
$0
State $40,000 $24,715,176
$0
Other $0 $0
Federal $120,000
$0
State $300,000 $16,493,000
Other $0 $0
Federal
$0 $5,910,400
State
Other
$0 $1,477,600
$4,700,000 $0
Federal $120,000
$0
State $30,000 $11,970,000
Other $0 $0
Federal $1,506,260
State $376,565
Other $0
Federal $617,600 $1,501,600
State $154,400 $375,400
Other $0 $0
Federal $0
$1,520,000
Federal $0
$800,000
Federal $0
$2,198,400
Federal $0
$8,708,000
State
$0 $380,000
Other
$45,000 $0
State
$0 $0
Other
$288,000 $200,000
State
$0 $0
Other
$50,000 $549,600
State
Other
$0
$50.000
$0 $2,177,000
Total
$107,237,000
Total $200,000 $24,715,176
Total $420,000 $16,493,000
Total $4,700,000 $7,388,000
Total $150,000 $11,970,000
Total $1,882,825
Total $772,000 $1,877,000
Total $45,000
$1,900,000
Total $288,000 $1,000,000
Total $50,000
$2,748.000
Total $50.000
$10,885,000
Page 114 of 300
-~
...'~.~'''
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2t7/2005
Dekalb
Project: 753230. Type Work: Widening
Descp: LITHONIA IND BLVD FM STN MTN-L1THONIA TO
ROGERS LAKE& RR SEP
Lanes: Exist. 2 Prop. 4
Length: 1.26
TIP#: DK-270AI.A
Project: 753265- Type Work: Intersection Improvement
Descp: EAST PONCE DE LEON AVE @ MCCLENDON DR &
GLENDALE RD
Length: 0.50
TlP#: DK-273
Project: 753290- Type Work: Intersection Improvement Descp: SR 236/LAVISTA RD AT BRIARCLIFF RDISR 42
Length: 0.20 TlP#: DK-274
Project: 770315. Type Work: Rail Projects
Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)
PHASE 1
Length: 0.00
TlP#: AR-269A
Project: 770316- Type Work: Rail Projects
Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)
PHASE 2
Length: 0.00
TlP#: AR-269B
Project: 771180. Type Work: Replace Bridge Descp: CR 164/L1NECREST ROAD @ CONLEY CREEK
NEAR PANTHERSVILLE RD Length: 0.19
TlP#: DK-256
Project: 771190. Type Work: Replace Bridge Descp: CR 1563/FLOWERS ROAD @ NORTH FORK
P'TREE CREEK NEAR MERCER U Length: 0.21
TIP#: DK-257A&B
Project: MOO2385 Type Work: Bridge Painting
Descp: PROPOSED BRIDGE PAINTING @ SEV LOCATIONS IN DEKALB & FULTON Length: 0.00
LUMP SUM PROJECT
TIP#: Lump
Project: M002387 Type Work: Bridge Painting Descp: 1-85 & 1-285 AT SEVERAL LOCATIONS PROPOSED
BRIDGE PAINTING Length: 0.00
LUMP SUM PROJECT
TIP#: Lump
Project: M002446 Type Work: Resurface & Maintenance Descp: SR 42 FM CUSTER AVENUE TO 1-20
LUMP SUM PROJECT
Length: 2.00 TIP#: Lump
Project: M002562 Type Work: Resurface & Maintenance Descp: SR 141 FROM FULTON COUNTY LINE TO
GWINNETT COUNTY LINE Length: 7.32
LUMP SUM PROJECT
TlP#: lump
Phase Fund
PE
HPP
ROW Bond
CST STP
CST HPP
Phase PE ROW CST
Fund Local Local STP
Year Underway
2005 2006 2006
Year LOCL LOCL 2006
Federal
$0 $4,719,200
$720,800
Federal $0 $0
$1,360,000
State
Other
$1,500,000 $1,179,800
$180,200
State $0 $0
$340,000
$0 $0 $0
Other $8,000 $1,250,000
$0
Phase Fund
PE
STP
ROW STP
CST STP
Year 2006 After 2007 After 2007
Federal $144,000
State $36,000
Other $0
Phase Fund
PE
STP
PE
HPP
CST HPP
Year Underway Underway
2005
Federal
State
$592,000
$148,000
Phase Fund CST HPP
Year 2005
Federal $40,000,000
State $10,000,000
Other
$0 Other
$0
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2006
Phase Fund
PE
Bridge
ROW Local
CST Bridge
CST STP
Phase Fund CST STP
Year Underway
LOCL 2005 2005
Year LUMP
Federal
$0 $149,600
Federal
$0 $644,000 $641,600 Federal $162,560
State
$0 $37,400
Other
$3,000 $0
State
$0 $158,000 $160,400
State $40,640
Other
$540,000 $0 $0
Other $0
Phase Fund CST 1M
Year LUMP
Federal $335,610
State $37,290
Other $0
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $480,000
State $120,000
Other $0
Phase Fund CST STP
Year 2005
Federal $2,268,773
State $567,193
Other $0
Total $1,500,000 $5,899,000
$901,000 Total
$8,000 $1,250,000 $1,700,000
Total $180,000
Total
$740,000
Total $50,000,000
Total $3,000
$187,000
Total $540,000 $802,000 $802,000 Total $203,200
Total $372,900
Total $600,000
Total $2,835,966
Page 115 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM ZmZQQ5
Dekalb
Project: MOO2823 Type Work: Interchange Descp: 1-285 INTERCHANGE @ SR 121COVINGTON HWY
LUMP SUM PROJECT
Length: 0.80 TfP#:
Project: MOO2824 Type Work: Interchange Descp: 1-285 INTERCHANGE @ SR 260/GLENWOOD RD
LUMP SUM PROJECT
Length: 0.80 TfP#:
Project: MOO2967 Type Work: Guardrail Descp: 1-285FROM CR 1764/ASHFORD DUNWOODY
ROAD TO CHAMBLEE TUCKER Length: 5.96
TfP#: AR-12611
Project: MOO2970 Type Work: Guardrail Descp: 1-285FROM WEST PACES FERRY ROAD TO
ASHFORD DUNWOODY ROAD Length: 9.78
T/P#: AR-IIIH
Project: TOOO594 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR DEKALB
COUNTY
Length: 0.00
TIP#: AR-DK-5310
Project: TOOO991 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR DEKALB
COUNTY
Length: 0.00
TIP#: AR-DK-5310
Project: TOO1115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rail - Phase II
Length: 0.00 TfP#:
Project: TOO1268 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DEKALB
COUNTY
Length: 0.00
TIP#: AR-DK-5310
Project: TOO1287 Type Work: Transit Projects Descp: Dekalb County BRT Improvements
Length: 0.00 TIP#:
Phase Fund
PE
1M
ROW 1M
CST 1M
Phase Fund
PE
1M
ROW 1M
CST 1M
Phase Fund
PE
1M
CST 1M
Year LUMP LUMP LUMP
Year LUMP LUMP LUMP
Year 2006 2006
Federal $6,300
$135,000 $306,000
State $700
$15,000 $34,000
Federal $6,300
$180,000 $315,000
State $700
$20,000 $35,000
Federal $1,600,000 $34,400,000
State $400,000 $8,600,000
Phase Fund
PE
NHS
CST NHS
Year 2007 2007
Federal $1,600,000 $30,400,000
State $400,000 $7,600,000
Phase Fund CST Transit
Year 2005
Federal $146,437
State $36,609
Phase Fund CST Transit
Year 2006
Federal $153,759
State $38,440
Phase Fund CST HPP
Year 2005
Federal $5,702,000
State $1,425,500
Phase Fund CST Transit
Year 2007
Federal $161,447
State $40,362
Phase Fund CST Transit
Year 2005
Federal $1,473,390
State $0
Other $0 $0 $0
Other $0 $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $0
Other $0
Other $294,678
Total $7,000
$150,000
$340,000 Total
$7,000
$200,000
$350,000
Total
$2,000,000
$43,000,000
Total
$2,000,000
$38,000,000
Total
$183,046
Total
$192,199 Total $7,127,500 Total
$201,809
Total
$1,768,068
Page 116of300
...'i' .'
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2012005
DOdge
Project: 0002226 Type Work: Replace Bridge Descp: CR 275/NEW BETHEL CH ROAD @ JOINER CREEK
9 MI NE OF CHAUNCEY Length: 0.20
TlP#:
Project: 0006476 Type Work: Guardrail
Descp: SR 117 FM EASTMAN CITY TO SR 29/US 441 S OF
DUBLIN @ 17 LOCS
Length: 20.74
LUMP SUM PROJECT
TJP#:
Project: 0006554 Type Work: Welcome center facilities Descp: DODGE COUNTY WELCOME CENTER
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 231930- Type Work: Widening
Descp: SR 30/US 280 FM WEST TO EAST CITY LIMITS OF
MILAN Lanes: Exisl. 2
Prop. 5
Length: 2.10
TJP#:
Project: 245355- Type Work: Replace Bridge
Descp: SR 87lEASTMAN-RHINE HWY @ SUGAR CREEK
1.8 MI S OF EASTMAN
Length: 0.29
TIP#:
Project: M002901 Type Work: Resurface & Maintenance Descp: SR 257 FM SR 126 IN DODGE TO CR 318/RAIL
ROAD ST IN LAURENS Length: 667
LUMP SUM PROJECT
TIP#:
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2006
Phase PE ROW CST
Fund STP STP STP
Year Underway
LUMP LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway After 2007
Phase Fund CST STP
Year LUMP
Federal $0
$397,600
Federal
$90,000 $675,000
Federal $314,400
State $0
$99,400
State $10,000 $75,000
State $0
Federal $815,469
State $203,867
Federal
State
Federal $547,200
State $136,800
Other $0 $0
Other $0 $0
Other $78,600
Other $0
Other
Other $0
Total $0
$497,000 Total $100,000 $750,000 Total $393,000
Total $1,019,336
Total
Total $684,000
Page 117 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005
Dooly
Project: 0002228 Type Work: Replace Bridge
Descp: CR 104/PLEASANT VALLEY RD @ LITTLE
PENNAHATCHEE CRK
Length: 0.11
TIP#:
Project: 0005320 Type Work: Intersection Improvement Descp: SR 215 @ 1-75
Length: 0.40 TfP#:
Project: 0006555 Type Work: Bicycle/Ped. Facility Descp: VIENNA PEDESTRIAN FACILITIES
LUMP SUM PROJECT
Length: 0.00 TfP#:
Project: 311665- Type Work: Bridge Rehab Descp: 1-75WIDEN BRIDGE & RAMPS @ SR 27
Length: 0.50 TfP#:
Project: 333190- Type Work: Replace Bridge
Descp: SR 27@PENNAHATCHEE CREEK WEST OF
VIENNA
Length: 0.22
TfP#:
Project: M002783 Type Work: Bridges Descp: 1-75@ 2 LaCS IN DOOlY & 1 LOC IN HOUSTON -
DECK REHAB Length: 1.20
LUMP SUM PROJECT
TIP#:
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCl 2005
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year Underway
2007 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund PE 1M ROW NHS CST NHS
Year Underway
2006 After 2007
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 After 2007
Phase Fund PE 1M CST 1M
Year lUMP lUMP
Federal $0
$492,000 Federal $160,000
Federal $400,000
Federal $731,200
Federal $36,000
Federal $135,000 $1,350,000
State $0
$123,000 State $40,000
State $0
State $182,800
State $9,000
State $15,000 $150,000
Other $0 $0
Other $0
Other $100,000
Other $0
Other $0
Other $0 $0
Total
$0 $615,000 Total $200,000
Total
$500,000
Total
$914,000
Total
$45,000
Total
$150,000
$1,500,000
Page 11801300
STATE TRANSPORTATION IMPROVEMENT PROGRAM ZmZOO5
Dougherty
Project: 0000522 Type Work: Intersection Improvement
Descp: SR 133 AT COUNTY LINE ROAD/CR 459 AT
WORTH/DOUGHERTY CO LN
Lanes: Exist. 2 Prop. 4
Length: 0.60
LUMP SUM PROJECT
TlP#: TSM-8
Project: 0002409 Type Work: Widening
Descp: CLARKE AVENUE/SR 300 FROM LIBERTY
EXPRESSWAY TO SR 62
Lanes: Exist. 4 Prop. 6
Length: 1.43
TlP#: HR-99-9
Project: 0002445 Type Work: Widening
Descp: SR 520 BUSINESS FM WASHINGTON ST TO
THORNTON DRIVE
Lanes: Exist. 4 Prop. 6
Length: 2.63
TIP#: H/R-99-11
Project: 0003774 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCS ALONG SR 234 & SR 91 Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006106 Type Work: Railroad Crossing
Descp: CS 1257/DON CUTLER SR DRIVE @ GFRR #723242T Length: 0.40
LUMP SUM PROJECT
TIP#:
Project: 0006693 Type Work: Transit Facilities Descp: ALBANY INTERMODAL FACILITY
Lanes: Exist.
Prop.
Length: 36.00 TIP#:
Project: 422550- Type Work: Interchange
Descp: SR 3/L1BERTY EXWY @ SR 91 & N.JEFFERSON
INTERCHANGE RAMPS
Length: 0.50
TlP#: NHS-2
Project: 422560- Type Work: Ramp
Descp: SR 31LIBERTY PKWY @ CLARK AVE - RAMPS &
TURN LANES/ALBANY
Length: 1.20
TlP#: NHS-4
Project: 422570- Type Work: Interchange
Descp: SR 3/L1BERTY EXWY @ NB & SB RAMPS AT SR
133/MOUL TRIE RD
Length: 0.50
TlP#: NHS-3
Project: 422675- Type Work: Signals
Descp: ATMS: ALBANY/DOUGHERTY COUNTY/GDOT
REGIONAL TCC
Length: 0.00
TlP#: NHS-6
Project: 431740-
Type Work: Widening
Descp: SLAPPEY BLVD/SR 62 & SR 520BU FM COLQUITI
AVE N TO TIFT AVE Lanes: Exist. 4 Prop. 6
Length: 1.92
TlP#: H/R-99-6
Phase Fund ROW STP CST STP
Year LUMP LUMP
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Phase Fund PE STP CST STP
Year Underway
LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST H170
Year 2005
Phase Fund PE NHS ROW NHS CST NHS
Year Underway
2006 2007
Phase Fund PE NHS ROW NHS CST NHS
Year Underway
2006 After 2007
Phase Fund PE NHS CST NHS
Year Underway
2006
Phase Fund CST NHS
Year 2005
Phase Fund PE STP ROW STP CST STP
Year 2005 2007 After 2007
Federal $90,000
$810,000
Federal $1,600,000
Federal $384,000
Federal $780,000
Federal $170,000
Federal $1,000,000
Federal $1,480,800 $1,742,400
Federal $1,061,600
Federal $3,619,200
Federal $336,800
Federal $134,400 $407,200
State $10,000 $90,000
State $400,000
State $96,000
State $195,000
State $0
State $0
State $370,200 $435,600 State $265,400
State $904,800
State $84,200
State $33,600 $101,800
Other $0 $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0 $0
Other $0
Other $0
Other $0
Other $0 $0
Total $100,000 $900,000
Total $2,000,000
Total $480,000
Total $975,000
Total $170,000
Total $1,000,000
Total $1,851,000 $2,178,000
Total $1,327,000
Total $4,524,000
Total $421,000
Total $168,000 $509,000
Page 119 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Dougherty
Project: MOO2960 Type Work: Descp: SR 133 @ FLINT RIVER
Bridges
LUMP SUM PROJECT
Length: 0.40 TlP#:
Project: TOOO641 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 OPERATING FOR ALBANY
Length: 0.00 TlP#:
Project: TOOO642 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR ALBANY
Length: 0.00 TIP#:
Project: TOOO643 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR ALBANY
Length: 0.00 TlP#:
Project: TOOO663 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR ALBANY
Length: 0.00 TlP#:
Project: TOOO901 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 OPERATING FOR ALBANY
Length: 0.00 TIP#:
Project: TOOO902 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR ALBANY
Length: 0.00 TIP#:
Project: TOOO903 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR ALBANY
Length: 0.00 TlP#:
Project: TOOO904 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR ALBANY
Length: 0.00 TlP#:
Project: TOO1221 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 OPERATING FOR ALBANY
Length: 0.00 TIP#:
Project: TOO1222 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR ALBANY
Length: 0.00 TlP#:
Phase Fund
PE
STP
CST STP
Year LUMP LUMP
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Federal $80,000
$640.000
State $20,000 $160,000
Other $0 $0
Federal $763,765
State $0
Other $1.196,353
Federal $496,710
State $62,089
Other $62.089
Federal $400,000
State $50.000
Other $50.000
Federal $29,745
State $7.436
Other $0
Federal $795,339
State $0
Other $1.213.802
Federal $402,510
State $50.314
Other $50.314
Federal $400,000
State $50.000
Other $50.000
Federal $31.232
State $7.808
Other $0
Federal $795,339
State $0
Other $1.359.127
Federal $402,510
State $50.314
Other $50.314
Total $100,000
$800,000
Total $1.960.138
Total
$620.887 Total $500,000 Total
$37.181 Total
$2.009.141 Total $503.138 Total $500.000 Total $39,040 Total $2.154,466 Total $503.138
Page 120of300
.'
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Dougherty
PrOject: TOO1223 Type Work: Transi! Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR ALBANY
Length: 0.00 TlP#:
Project: TOO1224 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR ALBANY
Length: 0.00 TIP#:
Project: TOO1297 Type Work: Transit Projects Descp: ALBANY INTERMODAL FACILITY
Length: 0.00 TlP#:
Phase Fund CST Transit
Year 2007
Federal $400,000
State $50,000
Phase Fund CST Transit
Year 2007
Federal $32,794
State $8,198
Phase Fund CST Transit CST Transit
Year 2005 2006
Federal $1,000,000 $1,000,000
State $0 $0
Other $50,000
Other $0
Other $250,000 $250,000
Total $500,000
Total $40,992
Total $1,250,000 $1,250,000
Page 121 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM za/ZQQ5
Douglas
Project: 0000333 Type Work: Intersection Improvement
Descp: SR 921DALLAS HIGHWAY AT THOMPSON
STREET/CR 519
Length: 0.50
TlP#: DO-28 I
Project: 0000424 Type Work: Intersection Improvement
Descp: SR 5/BANKHEAD HWY/BILL ARP RD AT ROSE
AVENUE/CS 573
Length: 0.20
LUMP SUM PROJECT
TIP#: AR-118
Project: 0000632 Type Work: Sidewalks
Descp: FAIRBURN RD SIDEWALKS FM BANKHEAD HWY
TO HOSPITAL DR
Length: 0.75
TlP#: DO-AR-BPO
Project: 0000633 Type Work: Sidewalks
Descp: MALONE ST SIDEWALKS FM STRICKLAND TO
BROWN ST
Length: 0.50
TlP#: DO-ARBPO
Project: 0000634 Type Work: Sidewalks
Descp: ROSE AVE SIDEWALKS FM SELMAN DR TO
CONCOURSE PKWY
Length: 1.00
TlP#: DOAR-BPO
Project: 0000635 Type Work: Sidewalks Descp: DOUGLAS BLVD SIDEWALKS W. FM BILL ARP/SR
5 TO BRIGHT STAR RD Length: 0.90
TlP#: DO-ARBPO
Project: 0000636 Type Work: Sidewalks Descp: CHAPEL HILL RD SIDEWALKS FM 120 TO CR
155/ARBOR PLACE BLVD Length: 0.37
TlP#: DOAR-BPO
Project: 0000952 Type Work: Replace Bridge Descp: SR 166 @ DOG RIVER 9.2 MI S OF DOUGLASVILLE
Length: 1.00 TIP#: DO-283
Project: 0001760 Type Work: HOV Lanes
Descp: 120 FM SR 6/DOUGLAS THRU COBB TO SR
280/FUL TON HOV LANES
Lanes: Exist. 8 Prop. 10
Length: 8.06
TIP#: AR-H-200
Project: 0001917 Type Work: Widening Descp: WIDEN LEE ROAD BRIDGE AT 1.20
Lanes: Exist. 2 Prop. 4
Length: 0.25 TIP#: DO-220B
Project: 0003165 Type Work: HOV Lanes
Descp: 120 WESTSIDE FROM SR 5/BILL ARP TO SR 6 FOR
HOVLANES
Lanes: Exist. 8 Prop. 10
Length: 9.97
TIP#: ARH-201
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL 2007
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
Local
CST CMAQ
Year LOCL 2005
Phase Fund PE Local ROW Local CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
STP
ROW Local
CST STP
Year 2006 LOCL 2006
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL Underway
Phase Fund PE NHS ROW NHS CST Bond
Year Underway
2006 After 2007
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year Underway
2006 2007
Phase Fund
PE
NHS
ROW NHS
CST Bond
Year Underway
2006 After 2007
Federal $0 $0
$160,000
Federal
$0 $1,117.800
Federal $0
$63.200
State $0 $0 $0
State
$0 $124,200
State $0 $0
Federal $0 $0
$50,400
Federal $0 $0
$217.600
Federal $0 $0
$78,400
Federal $0 $0
$29.600
Federal
$0
State $0 $0 $0
State $0 $0 $0
State $0 $0 $0
State $0 $0 $0
State
$0
Federal $5,000.000
State $1.250.000
Federal
$11.200 $1.600.000
State
$2.800 $400,000
Federal $4,000.000
State $1.000.000
Other $40.000 $75.000 $40.000
Other
$0 $0
Other $8.000 $15.800
Other $6.000
$0 $12.600
Other $20.000
$0 $54,400
Other $10.000
$0 $19.600
Other $4.000
$0 $7,400
Other
$10.000
Other
$0
Other
$0 $0
Other
$0
Total $40.000 $75,000 $200,000
Totat $0
$1.242.000
Total $8,000
$79.000
Total $6.000 $0
$63.000
Total $20.000
$0 $272.000
Total $10.000
$0 $98.000
Total $4.000 $0
$37.000
Total $10.000
Total $6.250.000
Total $14.000 $2.000.000
Total $5.000,000
Page 122 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005
Douglas
Project: 0003947 Type Work: Intersection Improvement Descp: SR 5/BILL ARP RD AT SR 166
LUMP SUM PROJECT
Length: 0.46 TIP#: AR-118
Project: 0004425 Type Work: New Construction
Descp: DURELEE LANE EXTENSION FM END OF
DURELEE LANE TO DORRIS RD
Lanes: Exist. 0 Prop. 2
Length: 0.78
TIPII: 00-009
Project: 0004427 Type Work: Widening Descp: LEE ROADISOUTH SWEETWATER RD PHASE 1
Lanes: Exist. 2 Prop. 4
Length: 0.40 TIP#: 00-022
Project: 0004428 Type Work: Widening
Descp: LEE ROAD FM 1-20TO FAIRBURN ROADISR 92
PHASE2 Lanes: Exist. 2
Prop. 4
Length: 2.83
TIP#: 00-220
Project: 0004481 Type Work: Lighting
Descp: DOUGLASVILLE GATEWAYS LIGHTING AND SIGNAGE FY 04 LCI PROJECT Length: 0.00
LUMP SUM PROJECT
TlP#: DOAR217
Project: 0004482 Type Work: Sidewalks
Descp: DOUGLASVILLE RESIDENTIAL SIDEWALKS FY
2004 LCI PROJECT
Length: 0.00
LUMP SUM PROJECT
TlP#: DO AR 219
Project: 0004504 Type Work: Bicycle/Ped. Facility Descp: VETERANS MEMORIAL HIGHWAY FM THORNTON
RD/SR 6 TO ROSEHILL ST Length: 1.00
TlP#: CO-AR-BPI8
Project: 0006270 Type Work: Intersection Improvement
Descp: DOUGLASVILLE INTERSECTION IMPROVEMENTS
- LCI PROJECT
Length: 0.00
LUMP SUM PROJECT
TlP#: DO-AR 220
Project: 0006324 Type Work: Replace Bridge
Descp: CR 201/MASON CREEK ROAD @ MOBLEY CREEK
TRIBUTARY
Length: 0.40
T/P#: 00-230
Project: 0006402 Type Work: ATMSIITS Descp: ATMS/ 1-20 RAMP METERS-HAR FM THORNTON
RD TO EVANS MILL RD Length: 30.30
T/P#: AR-444
Project: 0006457 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN
DOUGLAS/FULTON
Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund PE STP ROW STP CST STP
Year Underway Underway
LUMP
Phase PE ROW CST
Fund Bond Bond Bond
Year Underway
2005 2006
Phase Fund PE Bond PE STP ROW Bond CST Bond
Phase PE ROW CST
Fund Bond Bond Bond
Year Underway Underway
2006 2007
Year Underway
2006 2007
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund PE STP CST STP
Year Underway
LUMP
Phase Fund
PE
Local
CST CMAQ
Year LOCL 2005
Phase Fund PE STP CST STP
Year LUMP LUMP
Phase PE ROW CST
Fund Bridge Local Bridge
Year 2005 LOCL After 2007
Phase Fund
PE
NHS
CST Bond
Year 2006 2007
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal
State
$702,900
$78,100
Federal
$0 $0
State
$500,000 $1,400,000
Federal
State
$0 $0 Federal
$0 $0
$2,375,000 $4,284,000
State
$2,375,000 $6,035,000
Federal $73,600
State $0
Federal $295,900
State $0
Federal $0
$352,000
State $0 $0
Federal $40,000
$280,000
State $0 $0
Federal $24,800 $0
State $6,200 $0
Federal $32,000 $0
State $8,000
$2,500,000
Federal $896,000
State $224,000
Other
$0
Other $0 $0
Other
$0 $0 Other $0 $0
Other $18,180
Other $72,585
Other $44,000 $88,000
Other $10,000 $70,000
Other $0
$100,000
Other $0 $0
Other $0
Total
$781,000
Total $500,000 $1,400,000
Total
$2,375,000 $4.284,000
Total $2.375,000 $6,035,000
Total $91,780
Total $368,485
Total $44,000
$440,000
Total $50,000 $350,000
Total $31,000 $100,000
Total $40,000 $2,500,000
Total $1,120.000
Page 123 of 300
STATE TRANSPORTATlON IMPROVEMENT PROGRAM W/2QQ5
Douglas
Project: 0006622 Type Work: Multi-use Trail Descp: SWEETWATER CREEK GREENWAY & TRAIL
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 0006623 Type Work: Streetscapes Descp: O'NEAL PLAZA EAST IN DOUGLASVILLE
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006755 Type Work: Special Studies Descp: SR 6/CAMP CREEK PKWY FM 1-85 TO W HIRAM
PKWY- CORRIDOR STUDY Length: 29.07
TlP#: AR-465
Project: 0006902 Type Work: Unknown Descp: CR 8121CHAPEL HILL ROAD FROM 1-20 TO SR 166
Length: 6.67 TIP#: 00-284
Project: 712930- Type Work: Interchange
Descp: 1-20AT SR 921FAIRBURN RD & APPROACHES IN
DOUGLASVILLE
Length: 0.61
TIP#: 00-AR-208A
Project: 713620- Type Work: Widening
Descp: 1-20 FM SR 6fTHORNTON RD/DOUGLAS TO
FULTON INDUST BLVD/FULTO
Lanes: Exist. 6 Prop. 8
Length: 4.94
T1P#: 00-AR-057
Project: 720970- Type Work: New Construction
Descp: SR 92 RELOC FM DURELEE RD N TO SR 92 @
MALONE INCL GRADE SEP
Lanes: Exist. 0 Prop. 4
Length: 2.30
TlP#: 00-282C
Project: 721320- Type Work: Widening
Descp: BANKHEAD HWY FM SWEETWATER RD E TO
THORNTON RD
Lanes: Exist. 2 Prop. 4
Length: 1.10
TlP#: 00-016
Project: 721420. Type Work: Widening
Descp: SR 92 FM S/SR 166 NE TO LAKE MONROE RD/CR
140
Lanes: Exist. 2 Prop. 4
Length: 2.40
TIP#: 00-028
Project: 722040. Type Work: Widening
Descp: CAMP CREEK PKWY/SR 6fTHORNTON RD. FM 1-20
TO CHATT RIVER
Lanes: Exist. 4 Prop. 6
Length: 3.00
TlP#: AR-924B
Project: 753100. Type Work: Intersection Improvement Descp: KINGS HIGHWAY/CR 810 AT CENTRAL CHURCH
RD/CR 173 Length: 0.33
TlP#: 00-262
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year 2006
Phase Fund
PE
Local
ROW STP
CST STP
Year LOCL 2006 2007
Phase Fund
PE
1M
ROW 1M
CST Bond
Year Underway
2005 2006
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year 2006 After 2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 2006 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2005
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year 2007 After 2007 After 2007
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL 2006
Federal $350,400
State $0
Other $87,600
Federal $395,200
State $0
Other $98,800
Federal $600,000
State $0
Other $150,000
Federal $0
$500,000 $2,000,000
State $0 $0 $0
Other $300,000 $125,000 $500,000
Federal
$1,651,500 $0
State
$183,500 $5,084,000
Other
$0 $0
Federal $160,000
State $40,000
Other $0
Federal $4,000
$9,200,000
State $1,000
$5,320,000
Other $1,000,000 $2,300,000
Federal $4,351,200
'State $1,087,800
Other $0
Federal
State
Other
$7,440,000
Federal $144,000
$0 $1,860,000
State $36,000
Other $0
Federal
$0 $552,000
State
$0 $0
Other
$500,000 $138,000
Total $438,000
Total $494,000
Total $750,000
Total $300,000 $625,000 $2,500,000 Total $1,835,000 $5,084,000 Total $200,000
Total $1,005,000 $16,820,000
Total $5,439,000
Total
$9,300,000 Total $180,000
Total $500,000 $690,000
Page 124 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 217/2005
Douglas
Project: 753110- Type Work: Intersection Improvement Descp: CHAPEL HILL RD/CR 812 AT WEST CHAPEL HILL
RD/CR 145 Length: 0.20
TlP#: DO-252CI
Project: 753295- Type Work: Replace Bridge
Descp: ANNEEWAKEE RD/CR 815 BRIDGE @
ANNEEWAKEE CREEK
Length: 0.42
TIP#: DO-275A
Project: 770163- Type Work: Bridge Rehab Descp: POST RD/CR 808 BRIDGE @ DOG RIVER
Length: 020 TlP#: DO-274
Project: M002836 Type Work: Resurface & Maintenance
Descp: SR 166 FM CARROLL COUNTY LINE TO FULTON
COUNTY LINE
Length: 20.00
LUMP SUM PROJECT
TlP#:
Project: M002912 Type Work: Resurface & Maintenance
Descp: 1-20 EB FM SWEETWATER CREEK TO HE HOLMES
RD & 1-285 RAMPS
Length: 8.63
LUMP SUM PROJECT
TlP#:
Project: TOO0586 Type Work: Transit Projects
Descp: FY 2005 DOUGLAS COUNTY SECTION 5307
CAPITAL
Length: 0.00
TlP#: AR-DO-5307
Project: TOO0595 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR DOUGLAS
COUNTY
Length: 0.00
TlP#: AR-DO-5310
Project: TOO0932 Type Work: Transit Projects
Descp: FY 2006 DOUGLAS COUNTY SECTION 5307
CAPITAL
Length: 0.00
TlP#: AR-DO-5307
Project: TOO0992 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR DOUGLAS
COUNTY
Lenglh: 0.00
TlP#: AR-DO-5310
Project: T001273 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR DOUGLAS
COUNTY
Length: 0.00
TlP#: ARDO-5310
Project: TOO1328 Type Work: Transit Projects
Descp: FY 2007 DOUGLAS COUNTY SECTION 5307
CAPITAL
Length: 0.00
TlP#: AR-DO-5307
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL 2006
Phase PE ROW CST CST
Fund Bridge Local Bridge STP
Phase PE ROW CST
Fund Bridge Local Bridge
Year 2005 LOCL 2007 2007
Year 2005 LOCL After 2007
Phase Fund CST STP
Year LUMP
Federal
$0 $472,000
Federal $40,000 $0
$240,000 $249,600 Federal
$40,000 $0
Federal $2,088,000
State
$0 $0
State $10,000
$0 $0 $0 State $10,000 $0
State $522,000
Phase Fund CST 1M
Year LUMP
Federal $11,700,000
State $1,300,000
Phase Fund CST Transit
Year 2005
Federal $471,746
State $58,968
Phase Fund CST Transit
Year 2005
Federal $16,017
State $4,004
Phase Fund CST Transit
Year 2006
Federal $470,719
State $58,840
Phase Fund CST Transit
Year 2006
Federal $16,818
State $4,204
Phase Fund CST Transit
Year 2007
Federal $17,658
State $4,415
Phase Fund CST Transit
Year 2007
Federal $493,648
State $61,706
Other $500,000 $118,000
Other $0
$20,000 $60,000 $62,400 Other
$0 $21,000
Other $0
Other $0
Other $58,968
Other $0
Other $58,840
Other $0
Other $0
Other $61,706
Total $500,000 $590,000 Total
$50,000 $20,000 $300,000 $312,000 Total $50,000 $21,000
Total $2,610,000
Total $13,000,000
Total $589,682
Total $20,021
Total $588,399
Total $21,022
Total $22,073
Total $617,060
Page 125 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2m2005
Early
Project: 0003777 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCS
ALONG SR 62 & SR 1 Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006112 Type Work: Railroad Crossing Descp: CS 630/ARLINGTON AVE @ NS #733632H
LUMP SUM PROJECT
Lenglh: 0.40 TIP#:
Project: 0006527 Type Work: Water Pollution Mitig.
Descp: 3 PARCELS TO MITIGATE PI#422115 & 422220/EARLY &422230/CLAY Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 422215. Type Work: Widening
Descp: SR 1IUS 27 FM CR 279/DAMASCUS-HILTON RD TO
BLAKELY BYPASS Lanes: Exist. 2 Prop. 4
Length: 7.00
TIP#:
Project: 422220. Type Work: Widening
Descp: SR 1IUS 27 FR BLAKELY BYPASS TO CLAY
COUNTY LINE
Lanes: Exist. 2 Prop. 4
Length: 7.15
TlP#:
Project: 431320- Type Work: Replace Bridge Descp: SR 1 OVER BLUE CREEK TRIB
Length: 0.75 TlP#:
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $416,000
Slale $104,000
Phase Fund CST STP
Year LUMP
Federal $155,000
Slale $0
Phase Fund ROW STP
Year LUMP
Federal $1,600,000
Slale $400,000
Phase Fund
PE
State
PE
Bond
ROW Bond
ROW Bond
CST Bond
Phase Fund
PE State
ROW RRBS
CST RRBS
Year Underway Underway Underway
2005 2006 Year Underway 2006 After 2007
Phase Fund PE Bridge CST Bridge
Year Underway
2006
Federal
Slale
$0 $0 Federal
$3,740,000 $18,539,000
Slale
$0 $1,434,000
Federal $368,800
Slale $92,200
Olher $0
Olher $0
Olher $0
Olher
$0 $0 Olher $0
Olher $0
Total $520,000 Total $155,000 Total $2,000.000 Total $3,740,000 $18,539,000 Total $1,434,000 Total $461,000
Page 126 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2aI2QQ5
Echols
Project: 442985- Type Work: Replace Bridge Descp: SR 135 @ LITTLE RIVER APP 5 MI S OF JCT SR
376 Length: 0.26
TlP#:
Project: 442987- Type Work: Replace Bridge Descp: SR 94 @ SUWANNOOCHEE CREEK NEAR CLINCH
COUNTY LINE Length: 057
TlP#:
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway
2005
Federal $2.273.600
Federal $2.057.600
State $568,400 State $514,400
Other
Total
$0 Other
$2.842.000 Total
$0
$2,572.000
Page 127 of 300
STA TE TRANSPORTATION IMPROVEMENT PROGRAM 2aI2QQ5
Effingham
Project: 0001824 Type Work: New Construction
Descp: RINCON TRUCK BYPASS FM SR 21 NEAR
CHATHAM TO SR 275/SR 21
Lanes: Exist. 0 Prop. 2
Length: 11.25
TlP#:
Project: 0004913 Type Work: Widening
Descp: SR 119 FROM USHER ROAD TO SR 21 FOR
CENTER TURN LANE Lanes: Exist. 2 Prop. 3
Length: 3.00
TIP#:
Project: 0006482 Type Work: Railroad Crossing Descp: CR 105/BERRYVILLE RD @ CSX #635135L
LUMP SUM PROJECT
Length: 0.40 TlP#:
Project: 0006483 Type Work: Railroad Crossing Descp: CS 579/E. JOHNSON STREET@CSX#635129H
LUMP SUM PROJECT
Length: 0.40 TlP#:
Project: 0006636 Type Work: Multi-use Trail
Descp: GUYTON'S RAILS TO TRAILS COMMUNITY
PROJECT
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0008700 Type Work: Unknown
Descp: NORTH-SOUTH CONN FROM SR
119/EFFINGHAMTO SR 30/CHATHAM
Lanes: Exist. 0 Prop. 4
Lenglh: 14.40
TlP#:
Project: 522170- Type Work: Widening
Descp: SR 17&26/US 80 FM SR 17 TO CHERRY ST IN
BLOOMINGDALE/CHATHAM
Lanes: Exist. 2 Prop. 4
Lenglh: 2.49
TlP#: 96-H-5
Project: 533145- Type Work: Replace Bridge Descp: SR 26/US 80 @ OGEECHEE RIVER OVERFLOW 9
MI S OF GUYTON Length: 0.23
TlP#:
Project: 571450- Type Work: Replace Bridge Descp: CR 183/LOG LANDING ROAD @ EBENEZER
CREEK 4 MI N OF RINCON Lenglh: 0.15
TIP#:
Phase Fund PE STP ROW H060 ROW STP CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 After 2007 After 2007
Year 2005 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Federal $3.976.400
Federal $176.000
Federal $140.000
State $994.100
State $44.000
State $0
Phase Fund CST STP
Year LUMP
Federal $140.000
State $0
Phase Fund CST STP
Year LUMP
Federal $600.000
State $0
Phase Fund CST H170
Year 2005
Federal $250.000
State $0
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2005
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 2007
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2005
Federal
State
$4.197.600 $1,049,400
Federal
$10,400 $880,000
State
$2.600 $220.000
Federal
$0 $337,600
State
$0 $84,400
Other $0
Other $0
Other $0
Other $0
Other $150.000
Other $0
Other
$0 Other
$0 $0 Other $10.000 $0
Total
$4.970.500
Total
$220.000
Total
$140.000
Total
$140.000
Total $750.000
Total $250.000 Total $5.247.000
Total
$13.000 $1,100.000 Total
$10.000 $422.000
Page 128of300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2QQ5
Elbert
Project: 0000680 Type Work: Replace Bridge
Descp: CR 37/ELlAM ROAD @ WAHACHEE CREEK 5 MI S
OF MIDDLETON Lanes: Exist. 1 Prop. 2
Length: 0.21
TlP#:
Project: 0000681 Type Work: Replace Bridge
Descp: CR 84/SWEET CITY ROAD @ DOVE CREEK 6.5 MI
W OF ELBERTON Lanes: Exist. 1 Prop. 2
Length: 0.29
T/P#:
Project: 0000682 Type Work: Replace Bridge Descp: CR 195/PEACHTREE ROAD @L1TTLE
COLDWATER CREEK N OF ELBERTON Length: 0.21
T/P#:
Project: 0003907 Type Work: Intersection Improvement
Descp: SR 77 @ SR 368 & CR 242/BREWERS BR RD 3.5 MI
N OF ELBERTON
Length: 1.50
LUMP SUM PROJECT
TlP#:
Project: 0006604 Type Work: Welcome center facilities
Descp: ELBERT COUNTY CONFERENCE & WELCOME
CENTER
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006660 Type Work: Bridge Replacement Descp: CR 183/PLANTATION ROAD@ COLDWATER
CREEK Length: 0.40
TlP#:
Project: 132410 Type Work: Interchange
Descp: SR 721SR 17 IN ELBERTON RELOCATE
INTERCHANGE 1200 FT SW
Lanes: Exist. 2 Prop. 4
Length: 1.60
T/P#:
Project: 132990 Type Work: Replace Bridge Descp: SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
Length: 0.23 TlP#:
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2005
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2006
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2005
Phase PE ROW CST
Fund STP STP STP
Year Underway
LUMP LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year 2006 LOCL After 2007
Phase Fund
PE
State
ROW State
CST RRBS
Year Underway Underway
2006
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 After 2007
Federal $0
$194,400
Federal $0
$458,400
Federal $0
$265,600
Federal $1,372,500 $2.565.000
Federal $500.000
State $0
$24,300
State $0
$57,300
State $0
$33,200
State $152,500 $285,000
State $0
Federal $44,000 $0
State $11,000
$0
Federal
State
$0 $11,615,000
Federal $12,000
State $3,000
Other $10,000 $24,300
Other $10,000 $57,300
Other $10,000 $33,200
Other $0 $0
Other $125,000
Other $0
$50,000
Other
$0
Other $0
Total $10,000 $243,000
Total $10,000 $573.000
Total $10.000 $332,000
Total $1.525,000 $2.850,000
Total $625,000
Totat $55,000 $50,000
Total
$11,615,000
Total $15,000
Page 129 of 300
STA TE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Emanuel
Project: 0006109 Type Work: Railroad Crossing
cs Descp: 818/COLEMAN STREET @ OGE #732673J
LUMP SUM PROJECT
Length: 0.20 TIP#:
Project: 0006451 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN
EMANUELITREUTLEN
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 221900- Type Work: Widening
Descp: SR 4!US 1 FM SOUTH TO NORTH CTY LMTS IN
OAK PARK/NEW LOC Lanes: Exist. 2 Prop. 4
Length: 2.20
TlP#:
Project: 221910- Type Work: Widening Descp: SR 4!US 1 FROM NCL OAK PARK TO 1-16
Lanes: Exist. 2 Prop. 4
Length: 2,30 TlP#:
Project: 222490- Type Work: Widening
Descp: SR 4!US 1 FM N. OF 1-16 NORTH TO SR 297@
SWAINSBORO BYPASS Lanes: Exist. 2 Prop. 4
Length: 9,80
TlP#:
Project: 222500- Type Work: Widening
Descp: SR 4/US 1 FM CR 104 TO US l/SR 4 BUS NEAR
WADLEY & JEFFERSON
Lanes: Exist. 2 Prop. 4
Length: 7.10
TIP#:
Project: 222510- Type Work: Widening
Descp: SR 4/US 1 FM N SWAINSBORO BP TO CR 1041
RELOC @ DELW'D
Lanes: Exist. 2 Prop. 4
Length: 6.71
TlP#:
Project: 231960'
Type Work: Replace Bridge
Descp: SR 56 (3) BRIDGES OVER OGEECHEE RVR &
OVFL NE OF SUMMERTOWN
Length: 0.82
TIP#:
Project: 232325-
Type Work: Replace Bridge
Descp: SR 26!US 80 @ E FORK YAM GRANDY CK 2.2 MI
SW OF SWAINSBORO
Length: 0.21
TIP#:
Project: 522130- Type Work: Widening
Descp: SR 4!US 1 FM LYONS CL TO SOUTH CUOAK PARK
IN EMANUEL CO
Lanes: Exist. 2 Prop. 4
Length: 9.20
TIP#:
Phase Fund CST STP
Year LUMP
Phase Fund PE STP CST STP
Year Underway
LUMP
Phase Fund PE Stale PE Bond ROW Bond CST Bond
Phase Fund
PE
State
ROW Bond
CST Bond
Year Underway Underway
2006 2007
Year Underway
2006 2007
Phase Fund
PE
Slaie
PE
Bond
ROW Bond
CST Bond
Phase Fund
PE state
PE
Bond
ROW Bond
CST State
Phase Fund
PE
State
PE
Bond
ROW Bond
CST State
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway Underway
2005
Year Underway Underway
2005 After 2007
Year Underway Underway
2005 After 2007
Year Underway
2005 After 2007
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2006 After 2007
Phase Fund
PE Slate
PE
Bond
ROW Bond
CST Bond
Year Underway Underway
2007 After 2007
Federal $135,000
State $0
Federal $392,000
State $98,000
Federal
State
$0 $0 Federal
$0 $0
$650,000 $6,200,000
State
$85.000 $6,900,000
Federal
State
$0 Federal
$23,735,000 State
$0 $1,407,000
Federal
State
$0 Federal
$40,000
$680,000 State $10.000
Federal $12,000
State $3,000
Federal
State
$0 $2.750.000
Other $0
Other $0
Other
$0 $0 Other $0 $0 Other
$0 Other
$0 Other
$0 Other
$0
Other $0
Other
$0
Total $135,000
Total $490,000
Total $650,000 $6,200,000 Total
$85.000 $6.900,000
Total
$23,735.000 Total
$1,407,000 Total $680,000 Total $50.000
Total $15.000
Total $2,750.000
Page 130 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Evans
Project: 0002302 Type Work: Streetscapes Descp: CLAXTON STREETSCAPE PROJECT
LUMP SUM PROJECT
Length: 0.00 T/P#:
Project: 0006556 Type Work: Streetscapes
Descp: CLAXTON TRANSPORTATION & STREETSCAPE
PROJECT - PHASE II
Length: 0.00
LUMP SUM PROJECT
T/P#:
Project: 522105. Type Work: Widening
Descp: SR 30/CLAXTON FM WEST eTY LMTS TO EAST
eTY LMTS
Lanes: Exist. 2 Prop. 5
Length: 1.51
TlP#:
Phase Fund CST STP
Year LUMP
Federal $250,000
State $0
Phase Fund CST STP
Year LUMP
Federal $400,000
State $0
Phase PE ROW ROW CST
Fund State State RRBS RRBS
Year Underway Underway
2006 2007
Federal
State
$0 $3,982,000 $0 $7,390,000
Other $62,500
Other $100,000
Other
$0 $0
Total $312,500
Total $500,000
Total
$3,982,000 $7,390,000
Page 131 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5
Fannin
Project: 0006610 Type Work: Streets capes Descp: BLUE RIDGE MAIN STREET STREETSCAPE
IMPROVEMENT PROJECT Length: 0,00
LUMP SUM PROJECT
TlP#:
Project: 642165- Type Work: Replace Bridge
Descp: SR 60 OVER SKEENAH CREEK & CHAPEL
BRANCH {PIPE ONLY}
Length: 0.27
TIP#:
Phase Fund CST STP
Year LUMP
Federal $400,000
State $0
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway
2005
Federal $1,064,800
State $266,200
Other $100,000
Other $0
Total
$500,000
Total
$1,331,000
Page 132 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM zaLZQQ5
Fayette
Project: 0000399 Type Work: Intersection Improvement
Descp: SR 92 BET CR 204/HILO RD & CR 375/KINGWOOD
DRIVE-- TURN LANE
Length: 0.20
LUMP SUM PROJECT
TIP#: ARC NOT A
Project: 0002305 Type Work: Bridges
Descp: PEACHTREE CITY WEST VILLAGE MULTI-USE
BRIDGE
Length: 0.00
LUMP SUM PROJECT
TIP#: AR-384ABC
Project: 0004483 Type Work: Landscaping
Descp: SR 54 WEST BRIDGE/GATEWAY FY 2004 LCI
PROJECT
Length: 0.00
LUMP SUM PROJECT
TIP#: FAARI79
Project: 0005568 Type Work: Replace Bridge Descp: SR 92 @ FLINT RIVER 6.6 MILES W OF GRIFFIN
Length: 0.40 TIP#: SP-009
Project: 0008271 Type Work: BicyclelPed. Facility
Descp: MULIT-USE PATH OVER CSX AND ALONG SR 54
CULVERTS-LCIPROJ
Length: 0.40
LUMP SUM PROJECT
TIP#: FA-AR 180
Project: 0006272 Type Work: Parking Areas
Descp: SR 54/LANIER AVE FM DOWNTOWN AREA TO LAFAYETIE PARK - LCI Length: 0.00
LUMP SUM PROJECT
TIP#: FA-AR 181
Project: 0008592 Type Work: Sidewalks
Descp: GRADY AVENUE TRAIL & STONEWALLIBOOKER
SIDEWALKS
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006593 Type Work: Landscaping
Descp: SR 54 EAST LANDSCAPE ENHANCEMENTS -
PHASE IV
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006643 Type Work: Multi-use Trail Descp: HANDLEY PARK TO ANTHONY DRIVE EAST OF
TYRONE CONNECTOR Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006726 Type Work: Sidewalks Descp: FAYETIEVILLE CONNECTING SIDEWALKS
Length: 0.00 TIP#: FA-AR-BP05
Project: 322350. Type Work: Widening
Descp: SR 74 FM JUST SOUTH OF CROSSTOWN RD NW
TOSR 54 Lanes: Exist. 2
Prop. 4
Length: 2.65
TlP#: FA-074AI
Phase PE ROW CST
Fund STP STP STP
Phase Fund CST STP
Year LUMP LUMP LUMP
Year LUMP
Phase Fund PE STP CST STP
Year Underway
LUMP
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year 2005 After 2007 After 2007
Phase Fund PE STP CST STP
Year LOCL LUMP
Phase PE ROW CST
Fund STP STP STP
Year Underway
LUMP LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund PE Local CST STP
Year LOCL 2007
Phase PE ROW CST
Fund STP STP STP
Year Underway Underway
2006
Federal $31,500
$106,425 $319,500
Federal $200,000
State $3,500
$11,825 $35,500
State $0
Federal $432,000
State $0
Federal $89,600
State $22,400
Federal $20,000
$384,267
State $0 $0
Federal
$336,000 $968,000
Federal $500,000
State
$0 $0
State $0
Federal $168,000
State $0
Federal $320,800
State $0
Federal $0
$504,000
State $0 $0
Federal
State
$7,672,800
$1,918,200
Other $0 $0 $0
Other $50,000
Other $108,000
Other $0
Other $5,000 $96,067
Other $84,000 $242,000 Other $125,000
Other $42,000
Other $80,200
Other $63,000 $126,000
Other
$0
Total $35,000
$118,250 $355,000 Total $250,000
Total $540,000
Total $112,000
Total $25,000
$480,334
Total $420,000 $1,210,000 Total $625,000
Total $210,000
Total $401,000
Total $63,000
$630,000
Total
$9,591.000
Page 133 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM za/ZQQ5
Fayette
Project: 322355- Type Work: Widening
Descp: SR 74 FM SR 85 NW TO JUST SOUTH OF
CROSSTOWN RD Lanes: Exist. 2 Prop. 4
Length: 3.05
TlP#: FA-074BI
Project: 322357-
Type Work: Replace Bridge
Descp: SR 74 @ FLAT CREEK
Lanes: Exist. 2 Prop. 4
Length: 0.25 TIP#: FA-074B2
Project: 333177- Type Work: Replace Bridge Descp: SR 74 @ LINE CREEK COWETA-FAYETTE CO LINE
Length: 0.44 TlP#: CW-031
Project: 333185- Type Work: Replace Bridge
Descp: SR 85 NBL @ MORNING CREEK 3.5 MI N OF
FAYETTEVILLE
Length: 0.57
TlP#: FA-333
Project: 371446- Type Work: Bicycle/Ped. Facility Descp: REDWINE MULTIUSE TRAIL - PHASE 1
Length: 0.00 TlP#: FA-ARBPJ7
Project: 371447. Type Work: Bicycle/Ped. Facility Descp: REDWINE MULTIUSE TRAIL PHASE 3 & 4
Length: 0.00 TIP#:
Project: 721290. Type Work: Widening
Descp: SR 85 FM SR 279/FAYETTE N TO 6-LN @
ROBERTS DR/CLAYTON
Lanes: Exist. 4 Prop. 6
Length: 4.00
TIP#: CLOIS
Project: 721440- Type Work: Widening
Descp: SR 54 FM MCDONOUGH RD/FAYETT NE TO SR
3/US 19/41/CLAYTON CO
Lanes: Exist. 2 Prop. 4
Length: 7.16
TlP#: CL04IB
Project: 742870. Type Work: Widening
Descp: SR 920 FROM SR 54 TO SR 3/US 19 (REL SR 81)&
FAYETTE
Lanes: Exist. 2 Prop. 4
Length.' 5.73
TlP#: CL-JOI
Project: TOO0596 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR FAYETTE
COUNTY Length: 0.00
TlP#: ARFAS310
Project: TOO0993 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR FAYETTE
COUNTY Length: 0.00
TlP#: ARFAS310
Phase Fund PE STP ROW STP CST STP
Year Underway
2006 2007
Phase Fund
PE
Bridge
CST Bridge
Year Underway
2007
Federal
$5,584,000 $8,080,000
State
$1,396,000 $2,020.000
Federal $623,000
State $752.000
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2006 2007 2007
Year Underway Underway
2006
Phase Fund PE Local CST STP
Year LOCL 2005
Federal
$118,400 $844,800 $1.364.800 Federal
$2,123,200
Federal $0
$240.000
State
$29.600 $211,200 $341.200 State
$530,800
State $0 $0
Phase Fund PE Local ROW Local CST STP
Year LOCL LOCL 2005
Federal $0 $0
$240,000
State $0 $0 $0
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Federal $1.920,000
State $0
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Federal $4,006,400
State $1.001,600
Phase Fund PE STP ROW STP CST STP
Year 2006 After 2007 After 2007
Federal $1.000.000
State $250.000
Phase Fund CST Transit
Year 2005
Federal $16,017
State $4.004
Phase Fund CST Transit
Year 2006
Federal $16,818
State $4.204
Other $0 $0
Other $0
Other $0 $0 $0
Other
$0
Other $30.000 $60,000
Other $0 $0
$60.000
Other $480,000
Other $0
Other $0
Other $0
Other $0
Total $6,980,000 $10.100.000
Total $1.375.000
Total $148.000 $1,056,000 $1,706.000 Total
$2.654,000 Total $30.000 $300.000
Total $0 $0
$300,000 Total $2,400,000
Total $5.008,000
Total $1.250.000
Total $20.021
Total $21.022
Page 134 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM W12DD5
Fayette
Project: T001274 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR FAYETTE
COUNTY Length: 0.00
TIP#: AR.FA.5310
Phase Fund CST Transit
Year 2007
Federal $17,658
State $4,415
Other $0
Total $22.073
Page 135 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM Za12QQ5
Floyd
Project: 0000401 Type Work: Widening
Descp: SR 101 WIDENING FM CR 57/PLEASANT HOPE RD
TO S ROME BYPASS Lanes: Exist. 2 Prop. 4
Length: 3.53
TlP#:
Project: 0003771 Type Work: Signals
Descp: SR 101 @ EAST 9TH STREET - UPGRADE TRAFFIC
SIGNALS & PED
Length: 0.40
LUMP SUM PROJECT
TlP#:
Project: 0003786 Type Work: Intersection Improvement
Descp: SR 53/CALHOUN HIGHWAY AT CR 159/BURLINGTON ROAD Length: 0.35
LUMP SUM PROJECT
TlP#:
Project: 0004593 Type Work: Water Pollution Mitig.
Descp: 1991 STREAM CREDITS FOR PI 621600-1662420-/EDS-27( 154)&( 127) Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0005931 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS
LOCATIONS IN FLOYD COUNTY Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 620590- Type Work: Widening
Descp: SR 1!US 27 IN ROME FM 5TH AVE TO JOHN
DAVENPORT DR
Lanes: Exist. 4 Prop. 5
Length: 0.20
TlP#: L-85-11
Project: 621600- Type Work: New Construction
Descp: S ROME BYP/US 27 FM SR 1 ALONG BOOZE MTN
RD TO SR 101 @CR 96
Lanes: Exist. 0 Prop. 4
Length: 3.90
TIP#: 5-89-2\
Project: 621660- Type Work: New Construction
Descp: WEST ROME BYP FM N OF BLACKS BLUFF RD TO
SR20@CR262
Lanes: Exist. 0 Prop. 4
Length: 5.70
TIP#: 5-92-24
Project: 621670- Type Work: New Construction
Descp: SW ROME BYP FM PROP W ROME BYP @ CR 638
TO SR 1 @ CR 633&BRD
Lanes: Exist. 0 Prop. 4
Length: 4.60
TlP#: 5-92-23
Project: 632750- Type Work: Widening
Descp: SR 1fTURNER MCCALL BLVD FM RIVERBEND DR
TO MLK BLVD (SR53) Lanes: Exist. 4 Prop. 6
Length: 0.29
TlP#: 592-23
Phase PE ROW CST
Fund STP STP STP
Year 2007 After 2007 After 2007
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund ROW STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2005
Phase Fund
PE State
PE
Bond
ROW Bond
ROW Bond
ROW Bond
ROW Bond
ROW Bond
CST State
Phase Fund
ROW NHS
ROW NHS
CST NHS
Year Underway Underway Underway
2005 2006 2007 After 2007 After 2007 Year Underway 2007 After 2007
Phase Fund ROW STP ROW STP ROW HPP CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 2007 2005 After 2007
Year Underway
2007 After 2007
Federal $792,800
State $198,200
Federal $120,000
State $30,000
Federal
$211,500 $355,500
Federal $64,000
State
$23,500 $39,500
State $16,000
Federal $1,600,000
State $400,000
Federal
State
$3,140,800 Federal
$785,200 State
$0 $5,000,000 $0 $5,000,000 $0 $7,481,000
Federal $4,000,000
State $1,000,000
Federal $6,760,000 $3,057,600 $6,696,000
State $1,690,000
$764,400 $1.674,000
Federal $288,000 .
State $72,000
Other $0
Other $0
Other $0 $0
Other $0
Other $0
Other
$0 Other
$0 $0 $0
Other $0
Other $0 $0 $0
Other $0
Total
$991,000
Total
$150,000
Total
$235,000 $395,000
Total
$80,000
Total $2,000,000 Total
$3,926,000
Total $5,000,000 $5,000,000
$7,481,000
Total $5,000,000 Total $8,450,000
$3,822,000
$8.370.000
Total $360,000 Page 136of 300
STATE TRANSPORTA TION IMPROVEMENT PROGRAM 2a/2QQ5
Floyd
Project: 642395. Type Work: Replace Bridge
Descp: SR 156 @ JOHNS CREEK ON FLOYDGORDON CO
LINE
Length: 0.36
TIP#:
Project: 642405. Type Work: Replace Bridge
Descp: SR 100 @ COOSA RIVER 0.3 MI SOUTH OF JCT
WITHSR20
Length: 1.16
TlP#:
Project: 650360. Type Work: Widening
Descp: CR 373/RIVERSIDE PKWY FM SITURNER MCCALL
TO N ROME CONN Lanes: Exisl. 2 Prop. 4
Length: 1.54
TlP#: L-89-03
Project: 650540. Type Work: Widening
Descp: SR 101/2ND AVENUE FROM WEST 3RD STREET
TO SR 1120 Lanes: Exist. 4 Prop. 5
Length: 0.41
TlP#: 05-01
Project: 662340. Type Work: Widening
Descp: CR 373/RIVERSIDE PKWY/ROME FM BROAD ST
TO TURNERMCALL BLVD
Lanes: Exist. 2 Prop. 3
Length: 0.25
TlP#: L-85-20
Project: 662420. Type Work: Widening
Descp: SE ROME BYP/SR 746 FM SR 101 NE ALONG 4
EXIST RDS TO US 411 Lanes: Exist. 2 Prop. 4
Lenglh: 3.50
TIP#: L-8906
Project: TOO0662 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 OPERATING FOR ROME
Length: 0.00 TlP#:
Project: TOO0664 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPTIAL FOR ROME
Length: 0.00 TlP#:
Project: TOO0665 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR ROME
Lenglh: 0.00 TlP#:
Project: TOO0666 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR ROME
Length: 0.00 TIP#:
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Federal $1,556.800
State $389,200
Phase PE ROW CST CST
Fund Bridge Bridge Bridge STP
Phase PE ROW CST
Fund STP STP STP
Year Underway
2007 After 2007 After 2007
Year Underway Underway
2005
Federal $207,200
State $51.800
Federal
State
$6,760.000
$1.690.000
Phase PE ROW CST
Fund STP STP STP
Year Underway
2005 After 2007
Federal $15.200
State $3.800
Phase Fund ROW PR CST PR
Year Underway
2005
Federal $0
State $1.544.000
Other $0
Other $0
Other $0
Other $0
Other $0
Phase Fund
PE State
PE
Bond
ROW State
ROW Bond
ROW Bond
ROW Bond
CST Bond
Phase Fund
CST Transit
Year Underway Underway Underway Underway
2005 2007 After 2007 Year 2005
Federal
State
Other
$0 $5.000.000
$0
$0 $11,397,000
$0
Federal $631,766
State $0
Other $1.302,564
Phase Fund CST Transit
Year 2005
Federal $508,295
State $63.537
Other $63.537
Phase Fund CST Transit
Year 2005
Federal $200,000
State $25.000
Other $25.000
Phase Fund CST Transit
Year 2005
Federal $34.321
State $8.580
Other $0
Total $1.946.000
Total $259.000
Total $8,450.000
Total $19.000
Total $1.544.000
Total
$5.000,000 $11,397,000
Total $1,934.330
Total $635.369
Total $250,000
Total $42.901
Page 137 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Floyd
Project: T000922 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 OPERATING FOR ROME
Length: 0.00 TlP#:
Project: T000924 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPTIAL FOR ROME
Length: 0.00 TIP#:
Project: T000925 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR ROME
Length: 0.00 TlP#:
Project: T000926 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR ROME
Length: 0.00 TIP#:
Project: T001242 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 OPERATING FOR ROME
Length: 0.00 TIP#:
Project: T001243 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPTIAL FOR ROME
Length: 0.00 TIP#:
Project: T001244 Type Work: Transit Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR ROME
Length: 0.00 TIP#:
Project: T001245 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR ROME
Length: 0.00 TIP#:
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Federal $631,766
State $0
Other $1,399,249
Federal $728,000
State $91,000
Other $91,000
Federal $200,000
State $25,000
Other $25,000
Federal $36,038
State $9,009
Other $0
Federal $631,766
State $0
Other $1,526,204
Federal $584,000
State $73,000
Other $73,000
Federal $200,000
State $25,000
Other $25,000
Federal $37,839
State $9,460
Other $0
Total
$2,031,015
Total
$910,000
Total
$250,000
Total
$45,047
Total
$2,157,970 Total
$730,000
Total
$250,000
Total
$47,299
Page 138 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 217/2005
Forsyth
Project: 0000810 Type Work: Intersection Improvement
Descp: SR 9 AT 6 INTERSECTIONS AND SR 20 AT
TRIBBLE RD
Length: 2.40
TlP#: AR-157
Project: 0000811 Type Work: Intersection Improvement Descp: SR 369 AT 6 INTERSECTIONS BT WALDRIP RD
AND DOC BRAMBLETT RD Length: 2.40
TIP#: AR-118
Project: 0000812 Type Work: Intersection Improvement Descp: SR 306/KEITH BRIDGE RD @ SR 53;
SHADBURN/PARKS & WALDRIP RD Length: 0.80
TIP#: AR-157
Project: 0001037 Type Work: Widening
Descp: SR 369 FM SR 9 TO SR 306 INCL NEW
INTERCHANGE AT SR 400
Lanes: Exist. 0 Prop. 4
Length: 1.79
TIP#: FT-062A
Project: 0001757 Type Work: HOV Lanes
Descp: SR 400 FROM 1-285 TO MCFARLAND
ROAD/FORSYTH CO FOR HOV LANES
Lanes: Exist. 8 Prop. 10
Length: 17.06
TlP#: AR-H-400A
Project: 0002392 Type Work: Widening Descp: SR 20 FM SAMPLES RD TO BURGESS RD
Lanes: Exist. 2 Prop. 4
Length: 2.68 TIP#: FT-061D
Project: 0002862 Type Work: Widening
Descp: SR 20 FROM SR 369/CHEROKEE TO SR
3711FORSYTH Lanes: Exist. 2 Prop. 4
Length: 6.37
TIP#: FT-061
Project: 0003682 Type Work: Widening Descp: SR 20 FROM SR 371 TO SR 400
Lanes: Exist. 2 Prop. 4
Length: 8.39 TlP#: AR-920
Project: 0004429 Type Work: Widening
Descp: MCGINNIS FERRY ROAD FROM SARGENT ROAD
TO CHATTAHOOCHEE RIVER
Lanes: Exist. 2 Prop. 4
Length: 5.06
TlP#: FN-2338
Project: 0004430 Type Work: Widening
Descp: SR 20/CUMMING HWY FM PEACHTREE IND BLVD
TO BURGESS ROAD Lanes: Exist. 2 Prop. 4
Length: 4.60
TlP#: GW-020AI
Project: 0004634 Type Work: Widening
Descp: MCGINNIS FERRY ROAD FM SARGENT ROAD TO
MCFARLAND ROAD Lanes: Exisl. 2 Prop. 4
Length: 7.80
TIP#: FN-133A
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 After 2007
Federal $664,000 $3,995,200
Federal $1,177,600
State
$166,000 $0
Other
$0 $998,800
State $294,400
Other $0
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 After 2007
Federal $1,484,000
State $371,000
Other $0
Phase Fund
PE
STP
ROW STP
ROW State
CST STP
Phase Fund
PE
NHS
PE
NHS
ROW Bond
CST NHS
Phase Fund
PE
Local
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Year 2007 After 2007 Underway After 2007
Year 2005 2007 After 2007 Afler2007
Year LOCL 2005 Afler2007 After 2007
Year Underway After 2007 Afler2007
Federal $720,000
State $180,000
Other $0
Federal $4,000,000 $9,120,000
State $1,000,000 $2,280,000
Other $0 $0
Federal $0
$40,000
State $0
$100,000
Other $557,000 $557,000
Federal
State
Other
Phase Fund
PE
STP
ROW STP
ROW STP
ROW STP
ROW STP
CST STP
Phase Fund
ROW Bond
CST RRBS
Year 2006 After 2007 After 2007 After 2007 After 2007 After 2007 Year 2005 2006
Federal $1,760,000
State $440,000
Federal $0 $0
State $8,000,000 $12,600,000
Other $0
Other $0 $0
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year Underway
2006 Afler2007
Federal $0
State $5,000,000
Other $0
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL 2007
Federal $0 $0
$20,177,600
Stare $0 $0
$5,044,400
Other $2,500,000 $5,000,000
$0
Total $830,000 $4,994,000 Total $1,472,000
Total $1,855,000
Total $900,000
Total $5,000,000 $11,400,000
Total $557,000 $697,000
Total
Total $2,200,000
Total $8,000,000 $12,600,000
Total $5,000,000
Total $2,500,000 $5,000,000 $25,222,000
Page 139 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2al2QQ5
Forsyth
Project: 0005958 Type Work: Intersection Improvement Descp: SR 9 AT MARY ALICE PARK/BALDRIDGE/MEADOW
RD Length: 0040
LUMP SUM PROJECT
TlP#.
Phase Fund PE STP ROW STP CST STP
Project: 0006335 Type Work: ATMS/ITS
Descp: ATMS/SR 400 COMMUNIC/SURVEILANCE FM OLD
MILTON TO SR 20
Length: 11.32
TIP#: AR-435A&B
Phase Fund PE NHS CST Bond
Project: 0006586 Type Work: Multi-use Trail
Descp: FOWLER PARK FROM SR 9 TO MCGINNIS FERRY
ROAD
Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund CST STP
Project: 0006919 Type Work: Bicycle/Ped. Facility
Descp: CR 450/JAMES BURGESS RD FM OLD ATLANTA
RD TO RIVER MIST DR
Length: 2.63
TlP#: FT-AR-BPOO
Phase Fund PE Local ROW Local CST STP
Project: 0006945 Type Work: Miscellaneous Improvement
Descp: SR 369 FM CHEROKEE CO TO HALL CO CENTERLINE RUMBLE STRIPS Length: 19.75
LUMP SUM PROJECT
TlP#:
Phase Fund PE STP CST STP
Project: 121980- Type Work: Widening
Descp: SR 141 FM 0.6 MI NORTH OF FULTON CO LINE TO
SR9
Lanes: Exist. 2 Prop. 4
Length: 6.81
TlP#: FT-002A&B
Phase Fund PE STP ROW STP CST STP CST Bond
Project: 132985- Type Work: Replace Bridge
Descp: SR 20/CUMMING HWY @ CHATTAHOOCHEE
RIVER @ FORSYTH CO LINE
Lanes: Exist. 2 Prop. 4
Length: 0040
TlP#: GW-020A2
Project: 141880- Type Work: Widening
Descp: BETHELVIEW RD/SR 1005 FM SR 9 TO SR 20
INCLUDE SR 20 INT.
Lanes: Exist. 2 Prop. 4
Length: 6.11
TIP#: FT-OOS
Project: 141890- Type Work: Widening Descp: SR 9 FROM SR 20 TO SR 306 RELOCATION
Lanes: Exist. 2 Prop. 4
Length: 2.85 TIP#: FT-OOIE
Project: 142260- Type Work: Replace Bridge Descp: SR 369/MATT ROAD @ SETTINGDOWN CREEK 6
MI N OF CUMMING Length: 0040
TlP#: FT-060
Project: 722010- Type Work: Widening
Descp: SR 400 FROM SR 140/HOLCOMB BRIDGE ROAD
TO MCFARLAND ROAD
Lanes: Exist. 6 Prop. 8
Length: 8.99
TlP#: FN-AR-400A
Phase Fund PE Bridge ROW Bridge CST Bridge CST STP
Phase Fund PE STP ROW STP CST STP
Phase Fund PE STP ROW STP CST STP
Phase Fund PE Bridge ROW Bridge CST Bridge
Phase Fund
PE
NHS
CST Bond
Year Underway
LUMP LUMP
Year 2006 2007
Year LUMP
Year LOCL LOCL 2007
Year LUMP LUMP
Year Underway Underway
2006 2006 Year Underway 2006 After 2007 After 2007 Year Underway 2007 After 2007
Year 2007 After 2007 After 2007
Year Underway
2006 After 2007
Year 2005 2007
Federal
$1,068,300 $936,900
State
Other
$118,700 $104,100
$1,500,000 $0
Federal $120,000
$0
State $30,000 $11.000,000
Other $0 $0
Federal $880,800
State $0
Other $220,200
Federal $0 $0
$728,000
Federal $11,700
$117,000
State $0 $0 $0
Other $90,000 $100,000 $182,000
State $1,300
$13,000
Other $0 $0
Federal
State
Other
$7,996,000 $0
Federal
$1,999,000 $11,005,000
State
$412,000
$103,000
$0 $0 Other
$0
Federat $3,864,000
State $966,000
Other $0
Federat $4,000
State $1,000
Other $1,690,000
Federat $12,000
State $3,000
Other $0
Federal $1,600,000
$0
State $400,000 $33,000,000
Other $0 $0
Total $2,687,000 $1,041,000
Total $150,000 $11,000,000
Total $1,101,000
Totat $90,000 $100,000 $910,000
Total $13,000 $130,000
Total
$9,995.000 $11,005,000
Total $515,000
Total $4,830,000
Total $1,695.000
Total $15,000
Total $2.000,000 $33,000,000
Page 140 of 300
.'
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 217/2005
Forsyth
Project: 742920.
Type Work: Bridge Rehab
Descp: CR 1319/MCGINNIS FERRY RD @
CHATTAHOOCHEE RVRlFORSYTH/GWINET
Lanes: Exist. 2 Prop, 4
Length: 0,60
TIP#: FN.233C
Phase Fund
PE
STP
CST STP
Year 2005 2007
Federal $160,000 $1,600,000
State $40,000 $400,000
Other $0 $0
Total $200,000 $2,000,000
Page 141 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I2QQ5
Franklin
Project: 0003898 Type Work: Landscaping
Descp: LANDSCAPING ON 1-85 IN FRANKLIN AND HART
COUNTIES
Length: 3.25
LUMP SUM PROJECT
TlP#:
Project: 0006421 Type Work: Barriers
Descp: 1-85CABLE MEDIAN BARR,IERS IN HART &
FRANKLIN COUNTY
Length: 23.68
LUMP SUM PROJECT
TlP#:
Project: 0006489 Type Work: Railroad Crossing Descp: CS 800/CORNOG ROAD @ HRT #717525C
LUMP SUM PROJECT
Length: 0.20 TlP#:
Project: 110690-
Type Work: Widening
Descp: 1-85 FM N/SR 51 TO N/SR 320
Lanes: Exist, 4 Prop. 6
Length: 4.10 TlP#:
Project: 110700- Type Work: Widening Descp: 1-85 FM N/SR 320 TO N/SR 17
Lanes: Exist. 4 Prop. 6
Length: 9.30 TlP#:
Project: 110710. Type Work: Widening Descp: 1-85 FM N/SR 17 TO S/SC STATE LINE IN HART
Lanes: Exist. 4 Prop. 6
Length: 6.10 TlP#:
Project: 133001. Type Work: Replace Bridge Descp: SR 145@NORTH FORK BROAD RVR & SR 51
@MIDDLE FORK BROAD RVR Length: 0.47
TIP#:
Project: 142270. Type Work: Replace Bridge Descp: SR 51 @ NAILS CREEK 8.3 MI WEST OF
CARNESVILLE Length: 0.19
TlP#:
Phase Fund CST STP
Year LUMP
Federal $449,600
State $112,400
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $1,688,400
State $187,600
Phase Fund
PE
STP
CST STP
Year LUMP LUMP
Federal $6,000
$140,000
State $0 $0
Phase Fund
PE
NHS
PE
NHS
CST Bond
Year Underway
2005 After 2007
Phase PE PE CST
Fund NHS NHS Bond
Year Underway
2005 After 2007
Phase Fund
PE
NHS
PE
NHS
ROW Bond
CST Bond
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 After 2007 After 2007
Year Underway
2006 After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 After 2007
Federal $1,440,000
Federal $3,360,000
Federal $1,840,000
Federal $24,000
Federal $8,000
State $360,000
State $840,000
State $460,000
State $6,000
State $2,000
Other $0
Other $0
Other $0 $0
Other $0
Other $0
Other $0
Other $0
Other $0
Total $562,000
Total $1,876,000
Total $6,000
$140,000 Total $1,800,000 Total $4,200,000 Total $2,300,000 Total $30,000 Total $10,000
Page 142 of 300
-
STATE TRANSPORTATION IMPROVEMENT PROGRAM za12QQ5
Fulton
Project: 0000066 Type Work: Landscaping Oescp: SR 166 LANDSCAPING FROM 1-285 TO 1-75
LUMP SUM PROJECT
Lenglh: 6.00 TlP#: 1':0 TIP
Project: 0000103 Type Work: Bicycle/Ped. Facility
Oescp: ROGERS BRIDGE ROAD MULTI-USE TRAIL
PROJECT
Length: 0.00
LUMP SUM PROJECT
TIP#: AR384ABC
Project: 0000104 Type Work: Streetscapes Oescp: CRABAPPLE STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TIP#: AR-384ABC
Project: 0000184 Type Work: Sidewalks
Oescp: ATLANTA - LAKEWOOD HEIGHTS TOWN CENTER
STREETSCAPE
Length: 0.00
LUMP SUM PROJECT
TlP#: AR-384ABC
Project: 0000186 Type Work: Sidewalks
Oescp: ATLANTA - CHESHIRE BRIDGE ROAD
STREETSCAPE
Length: 0.00
LUMP SUM PROJECT
TlP#: AR-384ABC
Project: 0000191 Type Work: Bicycle/Ped. Facility Oescp: FAIRBURN RD SIDEWALK/BIKE LANES
LUMP SUM PROJECT
Length: 0.00 TlP#: AR-384ABC
Project: 0000194 Type Work: Bicycle/Ped. Facility Oescp: ATLANTA SOUTHTOWNE TRAIL PHASE 1
LUMP SUM PROJECT
Length: 0.00 TlP#: AR-384AI3C
Project: 0000198 Type Work: Intersection Improvement Oescp: SR 9 IN ROSWELL AT OXBO STREET
LUMP SUM PROJECT
Length: 0.20 TlP#: AR-157
Project: 0000199 Type Work: Intersection Improvement Oescp: SR 9 IN ROSWELL AT OAK STREET
Lanes: Exist. 0 Prop. 4 LUMP SUM PROJECT
Length: 0.28 TIP#: AR-157
Project: 0000200 Type Work: Historic Preservation Oescp: COLLEGE PARK RAIL DEPOT RESTORATION
LUMP SUM PROJECT
Length: 000 TlP#: AR384AI3C
Project: 0000248 Type Work: Intersection Improvement Oescp: SR 9IROSWELL ROAD AT DUNWOODY PLACE
Length: 0.20 TlP#: FN19IA
Phase Fund CST STP
Year LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL Underway
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Phase Fund ROW Local CST STP
Year LOCL LUMP
Phase Fund ROW Local CST STP
Year LOCL LUMP
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Phase Fund
PE
HPP
ROW HPP
CST HPP
Year Underway Underway
2005
Federal $449,600
Federal $0
$840,000
Federal $0
$1.100,000
Federal $0 $0
$300,000
Federal $0 $0
Federal $80,000
$300,000
Federal $0 $0
$440,000
Federal $0
$1,294,830
Federal $0
$1,278,090
Federal $0 $0
$236,000
Federal
$1,600,000
State $112,400
State $0 $0
State $0 $0
State $0 $0 $0
State $0 $0
State $0 $0
State $0 $0 $0
State $0
$143,870
State $0
$142.010
State $0 $0 $0
State
$400,000
Other $0
Other
$0 $210,000
Other $0
$275,000
Other $0 $0
$75,000
Other $0 $0
Other $20,000 $75,000
Other $0 $0
$110,000
Other $0 $0
Other $0 $0
Other $0 $0
$59,000
Other
$0
Total $562,000
Total $0
$1.050.000
Total $0
$1,375,000
Total $0 $0
$375,000
Total $0 $0
Total $100,000 $375.000
Total $0 $0
$550,000
Total $0
$1,438.700
Total $0
$1,420.100
Total $0 $0
$295,000
Total
$2,000,000
Page 143 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM Za12QQ5
Fulton
Project: 0000249 Type Work: Intersection Improvement Descp: SR 9/ROSWELL ROAD AT NORTHRIDGE ROAD
Length: 0.20 TlPII: FN-1910
Project: 0000252 Type Work: Intersection Improvement Descp: SR 140/HOLCOMB BRIDGE ROAD AT HOUZE
ROAD/ALPHARETTA HIGHWAY Length: 0.20 TlPII: FN-19IE
Project: 0000259 Type Work: Intersection Improvement Descp: JONES BRIDGE ROAD/CR 65 AT DOUGLAS ROAD
Length: 0.20 TtPII: FN-19IL
Project: 0000260 Type Work: Intersection Improvement Descp: JONES BRIDGE ROAD/CR 65 AT SARGENT ROAD
Length: 0.20 TlPII: FN-19IM
Project: 0000261 Type Work: Intersection Improvement Descp: WEBB BRIDGE ROAD/CR 70 AT PARK BRIDGE
PARKWAY/SHIRLEY BR RD Length: 0.20 TIPII: FN-I92A
Project: 0000265 Type Work: Intersection Improvement Descp: HARDSCRABBLE RD/CR 1330 AT CHAFIN ROAD
Length: 050 TlPII: FN-192H
Project: 0000266 Type Work: Intersection Improvement Descp: MAYFIELD ROAD/CR 1324 AT PROVIDENCE ROAD
Length: 0040 TIPII: FN-I92F
Project: 0000337 Type Work: Sidewalks Descp: EAST WESLEY SIDEWALK FM PEACHTREE RD TO
PIEDMONT RD&BIKE/PED Length: 1.26 TIPII: AT-AR-8P30
Project: 0000338 Type Work: Bicycle/Ped. Facility Descp: WILLEO/COLEMAN ROAD - BIKE/PED FM SR 120
TO COLEMAN RD Length: 0.68 TlPII: FN-AR-8PIO
Project: 0000376 Type Work: Miscellaneous Improvement Descp: ADDED ENFORCEMENT TO REDUCE TRUCK
SPEEDING; TAILGATING; ETC. Length: 0.00 TIPII: AR-3598
Project: 0000377 Type Work. Miscellaneous Improvement Descp: PROMOTIONAL CAMPAIGN TO REDUCE TRUCKS
DURING RUSH HOUR Length: 0.00 TlPII: AR-359A
Phase Fund PE HPP ROW HPP CST HPP
Phase PE PE ROW CST
Fund HPP HPP HPP HPP
Phase Fund PE HPP ROW HPP CST HPP
Phase Fund PE HPP ROW HPP CST HPP
Phase Fund PE HPP PE HPP ROW HPP CST HPP
Phase Fund PE HPP PE HPP ROW HPP CST HPP
Phase Fund PE HPP ROW HPP CST HPP
Phase Fund CST STP
Phase Fund PE Local CST CMAQ
Phase Fund CST NHS
Phase Fund PE NHS CST NHS
Year Underway Underway
2005
Year Underway Underway
2006 2007 Year Underway Underway 2006
Year Underway Underway
2006
Year Underway Underway
2006 2007 Year Underway Underway 2006 2007 Year Underway Underway 2005
Year 2005
Year LOCL 2005
Year 2005
Year Underway
2005
Federal
$1,440,000 Federal
$240,000 $1,600,000
Federal
$488,000 Federal
$440,000 Federal
$236,000 $960,000 Federal
$100,000 $640,000 Federal
$640,000 Federal $1,000,000
Federal $0
$520,800
Federal $400,000
Federal $320,000
State
$360,000 State
$0 $400,000 State
$122,000 State
$110,000 State
$0 $240,000 State
$0 $160,000 State
$160,000 State
$0
State $0 $0
State $100,000
State $80,000
Other
$0 Other
$60,000 $0
Other
$0 Other
$0 Other
$59,000 $0
Other
$25,000 $0
Other
$0 Other $250,000
Other $35,000 $130,200
Other $0
Other $0
Total
$1,800,000 Total
$300,000 $2,000,000
Total
$610,000 Total
$550,000 Total
$295,000 $1,200.000
Total
$125,000 $800,000 Total
$800,000 Total $1,250.000
Total $35.000 $651,000
Total $500,000
Total $400,000
Page 144 of 300
...'''
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM waDD5
Fulton
Project: 0000526 Type Work: Intersection Improvement Descp: FREEMANVILLE ROAD AT PROVIDENCE ROAD
Length: 0.20 T/P#: FN-213
Project: 0000527 Type Work: Intersection Improvement Descp: FREEMANVILLE ROAD AT BIRMINGHAM ROAD
Length: 0.20 TIP#. FN-212
Project: 0000531 Type Work: Intersection Improvement Descp: PROVIDENCE ROAD @ BETHANY ROAD
Length: 0.20 TIP#: FN-208
Project: 0000533 Type Work: Intersection Improvement
Descp: SR 140/ARNOLD MILL ROAD @NEWPROVIDENCE
ROAD
Length: 0.20
T/P#: FN-206
Project: 0000554 Type Work: Roadway Project
Descp: ALEXANDER ST FM NORTHSIDE DR TO WEST
PEACHTREE ST
Length: 0.50
T/P#: AT-188A
Project: 0000568 Type Work: Ride Sharing Descp: UNIVERSITY RIDESHARE PROGRAM: YEAR 5
Lenglh: 0.00 TIP#: AR-700F
Project: 0000589 Type Work: Ride Sharing
Descp: REGIONAL VAN POOL SUBSIDY PROGRAM-50
VAN POOLS: YEAR 2
Length: 0.00
T/P#: AR-296B
Project: 0000603 Type Work: Miscellaneous Improvement Descp: PEDESTRIAN SAFETY; AWARENESS &
PROMOTION CAMPAIGN: PHASE 2 Length: 0.00
TIP#: AT-AR-BP-2
Project: 0000607 Type Work: Sidewalks
Descp: HOLLYWOOD RD SIDEWALKS FM BOLTON RD TO
BANKHEAD HWY/SR 8
Length: 3.23
TlP#: AT-AR-BPI2
Project: 0000609 Type Work: Sidewalks Descp: ROSWELL RD/SR 9 SIDEWALKS FM PEACHTREE
RD TO ATLANTA CITY LI Length: 2.78
TlP#: AT-AR-BP-I
Project: 0000610 Type Work: Sidewalks
Descp: CHILDRESS DR SIDEWALKS FM CASCADE RD TO
CAMPBELLTON RD
Length: 1.34
T/P#: AT-AR-BPI5
Phase Fund PE HPP ROW HPP CST HPP
Phase Fund
PE
HPP
ROW HPP
CST HPP
Phase Fund PE HPP ROW HPP CST HPP
Phase Fund PE HPP ROW HPP CST HPP
Phase Fund PE Bond ROW Bond CST Bond
Phase Fund PE CMAQ
Phase Fund PE CMAQ
Phase Fund PE CMAQ
Phase Fund PE Local ROW Local CST CMAQ
Phase Fund PE Local ROW Local CST Local
Phase Fund PE Local ROW Local CST CMAQ
Year Underway
2006 2007
Year Underway
2005 2006
Year Underway
2006 2007
Year Underway
2006 2007
Year Underway
2005 2005
Year 2007
Year 2007
Year 2007
Year LOCL LOCL 2005
Year LOCL LOCL 2006
Year LOCL LOCL 2005
Federal
$240,000 $640,000
State
$0 $0
Federal
$200,000 $640,000
State
$0 $0
Federal
$280,000 $720,000
State
$0 $0
Federal
$200,000 $560,000
State
$0 $0
Federal
$0 $0
State
$720,000 $7,680,000
Federal $900,000
State $0
Federal $300,000
State $0
Federal $80,000
State $0
Federal $0 $0
$360,000
Federal $0 $0 $0
Federal $0 $0
$185,600
State $0 $0 $0
State $0 $0 $0
State $0 $0 $0
Other $60,000 $160,000
Other $50,000 $160,000
Other $70,000 $180,000
Other $50,000 $140,000
Other $0 $0
Other $0
Other $0
Other $20,000
Other $0 $0
$90,000
Other $0 $0
$572,000
Other $0 $0
$46,400
Total $300,000 $800,000
Total $250,000 $800,000
Total $350,000 $900,000
Total $250,000 $700,000
Total $720,000 $7,680,000
Total $900,000
Total $300,000
Total $100,000
Total $0 $0
$450,000
Total $0 $0
$572,000
Total $0 $0
$232,000
Page 145 of 300
STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM 2a/2005
Fulton
Project: 0000611 Type Work: Sidewalks
Descp: COLLIER RD SIDEWALKS FM HOWELL MILL TO
PEACHTREE RD
Length: 1.25
tte ATARBPI5
Project: 0000639 Type Work: Bicycle/Ped. Facility
Descp: RIVERSIDE DRIVE BIKE/PED FM JOHNSON FERRY
RD TO 1-285
Length: 0.95
TIPt/: FNARBP05
Project: 0000640 Type Work: BicyclelPed. Facility
Descp: RIVER VALLEY RD FM RIVERSIDE DR TO
ABERNATHY RD
Length: 1.27
tie FNARBP06
Project: 0000643 Type Work: Bicycle/Ped. Facility Descp: SHANNON PKWY BIKE/PED FM MALL BLVD TO SR
138 Length: 0.32
TlPt/: FSAR-BP06
Project: 0000675 Type Work: Bicycle/Ped. Facility
Descp: BUFFINGTON RD BIKE LANE FM FLAT SHOALS RD
TO OLD BILL COOK
Length: 1.12
TlPt/: FSARBP08
Project: 0000784 Type Work: Interchange Descp: 1-285/SR 400 INTERCHANGE RECONSTRUCTION &
HOVSYSTEM Length: 0.40
TlPt/: AR-H-900A
Project: 0001298 Type Work: Realignment
Descp: 1-75 NB ATLANTIC STATION:14TH ST BR; RAMP;
WILLIAMS ST RELOC
Length: 0.20
TlPt/: ATAR-224D
Project: 0001317 Type Work: Rail Projects Descp: ATLANTA MULTI-MODAL PASSENGER TERMINAL
PHASE 2; CT 2 Length: 0.00
tte AR120G
Project: 0001319 Type Work: Rail Projects Descp: COMMUTER RAIL PROGRAM MANAGEMENT - 2005
Length: 0.00
tie AR-344A
Project: 0001320 Type Work: Rail Projects Descp: COMMUTER RAIL PROGRAM MANAGEMENT. 2006
Length: 0.00 TlPt/: AR-344B
Project: 0001321 Type Work: Rail Projects Descp: COMMUTER RAIL PROGRAM MANAGEMENT 2006
Length: 0.00
tte AR-3448
Phase Fund
PE
Local
ROW Local
CST CMAQ
Phase Fund
PE
Local
ROW Local
CST CMAQ
Phase Fund
PE
Local
CST CMAQ
Year LOCL LOCL 2005
Year LOCL LOCL 2006
Year LOCL 2006
Federal $0 $0
$160,000
Federal $0 $0
$720,000
Federal $0
$960,000
State $0 $0 $0
State $0 $0 $0
State $0 $0
Phase Fund
PE
CMAQ
ROW Local
CST CMAQ
Year 2005 LOCL 2005
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
Bond
PE
NHS
PE
NHS
ROW NHS
CST NHS
Phase Fund
ROW Bond
CST Bond
Year After 2007 After 2007
2006 After 2007 After 2007
Year 2005 2006
Federal $0 $0
$444,800
Federal $0 $0
$1,118,400
Federal
State $0 $0 $0
State $0 $0 $0
State
$4,000,000 $1,000,000
Federal $0 $0
State $45,200,000 $37,000,000
Phase Fund CST NHS
Year 2007
Federal $12,000,000
State $3,000,000
Phase Fund
PE
Other
Year 2005
Federal $0
State $2,000,000
Phase Fund
PE
Other
Year 2006
Federal $0
State $2,000,000
Phase Fund
Year
Federal
State
Other $20,000 $100,000 $40,000
Other $180,000 $800,000 $180,000
Other $120,000 $240,000
Other $12,000
$0 $111,200
Other $273,000 $290,000 $279,600
Other
$0
Other $0 $0
Other $0
Other $0
Other $0
Other
Total $20,000 $100,000 $200,000
Total $180,000 $800,000 $900,000
Total $120,000 $1,200,000
Total $12,000
$0 $556,000
Total $273,000 $290,000 $1,398,000
Total
$5,000,000
Total $45,200,000 $37,000,000
Total $15,000,000
Total $2,000,000
Total $2,000,000
Total
Page 146 of 300
...-''
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
FUlton
PrOject: 0001757 Type Work: HOV Lanes
Descp: SR 400 FROM 1285 TO MCFARLAND
ROAD/FORSYTH CO FOR HOV LANES
Lanes: Exist. 8 Prop. 10
Length: 17.06
TIP#: ARH400A
Project: 0001758 Type Work: HOV Lanes
Descp: 1-285 FM 1-75iCOBB THRU FULTON TO
1-85/DEKALB FOR HOV Lanes: Exist. 10 Prop. 12
Length: 13.12
T1P#: AR-H-300A
Project: 0001780 Type Work: HOV Lanes
Descp: 1-20FM SR 6/DOUGLAS THRU COBB TO SR
280/FUL TON - HOV LANES
Lanes: EXist. 8 Prop. 10
Length: 8.06
TIP#: ARH200
Project: 0001787 Type Work: Rail Projects
Descp: ATLANTA TO ATHENS RAIL LINE GRADE CROSSING SAFETY UPGRADES Length: 0.00
LUMP SUM PROJECT
TIP#: AR-378
Project: 0001792 Type Work: Interchange
Descp: 1-75 AT 15TH STREET BR & HOV INTERCHANGE
ATLANTIC STATION
Length: 0.50
T1P#: AR-H600A
Project: 0001895 Type Work: Streetscapes Descp: VIRGINIA HIGHLAND STREETSCAPES FM
UNIVERSITY TO FREEDOM PKWY Length: 0.00
TIP#: ATAR-IlP30
Project: 0002165 Type Work: Railroad Crossing
Descp: CS 6021/BAYARD ST IN EAST POINT@ NS #
718006D
Length: 0.40
LUMP SUM PROJECT
T1P#: AR-156
Project: 0002308 Type Work: Bicycle/Ped. Facility Descp: SOUTH FULTON SCENIC BYWAY BICYCLE ROUTE
LUMP SUM PROJECT
Length: 0.00 T1P#: AR384ABC
Project: 0002310 Type Work: Streetscapes
Descp: ROSWELL ROAD TRANSITORIENTED
STREETSCAPE
Length: 0.00
LUMP SUM PROJECT
T1P#: AR-384ABC
Project: 0002312 Type Work: Streetscapes
Descp: PERRY BOULEVARD/HOLLYWOOD ROAD NODE
STREETSCAPE
Length: 0.20
LUMP SUM PROJECT
T1P#: AR-384ABC
project: 0002316 Type Work: Sidewalks Descp: CITY OF ROSWELL - DESIGN/CONSTR.SIDEWALK
ALONG OLD HOLCOMB B Length: 0.00
LUMP SUM PROJECT
T1P#: AR-384ABC
Phase PE PE ROW CST
Fund NHS NHS Bond NHS
Phase PE PE PE PE ROW CST Phase PE ROW CST
Fund Bond NHS NHS NHS Bond NHS
Fund NHS NHS Bond
Year 2005 2007 After 2007 After 2007
Year After 2007 Underway
2006 2007 After 2007 After 2007 Year Underway 2006 After 2007
Federal $4,000,000 $9,120,000
State $1,000,000 $2,280,000
Federal
State
$4,000,000 $4,000,000
$1,000,000 $1,000,000
Federal $5,000,000
State $1,250,000
Phase Fund CST STP
Year LUMP
Federal $125,000
State $0
Phase Fund PE NHS ROW Bond CST Bond
Year 2005 After 2007 After 2007
Phase Fund PE Local CST CMAQ
Year LOCL 2005
Federal $2,400,000
Federal $0
$500,000
State $600,000
State $0 $0
Phase Fund CST STP
Year LUMP
Federal $100,000
State $0
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase Fund CST STP
Year LUMP
Federal $800,000
State $0
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Other $0 $0
Other
$0 $0
Other $0
Other $0
Other $0
Other $20,000 $125,000
Other $0
Other $125,000
Other $200,000
Other $125,000
Other $125,000
Total $5,000,000 $11,400,000
Total
$5,000,000 $5,000,000
Total $6,250,000
Total $125,000
Total $3,000,000
Total $20,000 $625,000
Total $100,000
Total $625,000
Total $1,000,000
Total $625,000
Total $625,000
Page 147 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
2t7I2QQ5
Fulton
Project: 0002649 Type Work: Bicycle/Ped. Facility Descp: JOHN'S CRK GREENWAY/FULTON FM
RIVER/GWINNETT TO FORSYTH-PH 1 Length: 4.70
TIP#: FN-AR-BI'07
Project: 0002754 Type Work: ATMS/ITS
Descp: ATMS:I-285 SURVEIL FM 1-75/CLAYTON NE THRU
FULTN TO 1-20/DEK
Length: 11.45
TIP#: AR-281
Project: 0002800 Type Work: Intersection Improvement
Descp: SR 421US 23/MORELAND AVE @ SR 42 CONN/FREEDOM PARKWAY Length: 0.16
LUMP SUM PROJECT
TlP#: AR-118
Project: 0002844 Type Work: Bicycle/Ped. Facility
Descp: PEACHTREE ST FROM 3RD STREET TO 10TH
STREET (LCI PROJECT) Length: 0.56
LUMP SUM PROJECT
TIP#: AT-AR-230
Project: 0002845 Type Work: BicyclelPed. Facility
Descp: WEST PEACHTREE ST FROM NORTH AVE TO 17TH ST (LCI PROJECT) Length: 0.50
LUMP SUM PROJECT
TlP#: AT-AR-232
Project: 0002904 Type Work: Sidewalks Descp: SR 236/LAVISTA RD FM CHESHIRE BR RD/FL TN
TO BRIARCLIFF RD/DE Length: 1.82
TIP#: DK-AR-BI'OS
Project: 0003162 Type Work: HOV Lanes
Descp: 1-85 FROM RIVERDALE RD NORTH TO 1-75 FOR
HOV LANES Lanes: Exist. 6 Prop. 8
Length: 5.86
TlP#: AR-H-ISOA
Project: 0003495 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN EASTPOINT Length: 0.00
LUMP SUM PROJECT
TlP#: AR-130H
Project: 0003511 Type Work: Transit Projects Descp: GRTA NW CORRIDOR TRANSIT - G.O.
Length: 0.00 TlP#: AR-2SID
Project: 0003512 Type Work: Transit Projects Descp: GRTA NW CORRIDOR TRANSIT - G.O.
Length: 0.00
TIP#: AR-2S18
Project: 0003534 Type Work: Transit Projects Descp: 1-285 FROM CUMBERLAND TO PERIMETER
CENTER TRANSIT Length: 9.37
TlP#: AR-900C
Phase Fund
PE
HPP
ROW HPP
CST HPP
Year Underway
2005 2006
Phase Fund CST Bond
Year 2005
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year 2006 2007 After 2007
Phase Fund
PE
NHS
PE
NHS
ROW Bond
CST NHS
Phase Fund PE STP CST STP
Year 2006 After 2007 After 2007 After 2007
Year LUMP LUMP
Phase Fund ROW Bond CST Bond
Year 2007 After 2007
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year 2005 2006 After 2007
Phase Fund
PE
NHS
ROW Bond
CST Bond
CST Bond
Year 2007 After 2007 After 2007 After 2007
Federal
$2,000,000 $5,120,000
State
Other
$0
$500,000
$0 $1,280,000
Federal $0
State $12,758,000
Other $0
Federal
$0 $116,360
Federal
$0 $1,560,000
Federal
$0 $3,000,000
Federal $16,000 $48,000
State
$0 $12,929
Other
$0 $0
State
$0 $0
Other
$0 $390,000
State
$0 $0
Other
$0 $750,000
State $4,000
$12,000
Other $0 $0
Federal $4,000,000
State $1,000,000
Other $0
Federal $5,600
$640,000
State $1,400
$160,000
Other $0 $0
Federal $0
State $70,200,000
Other $0
Federal $0 $0
State $30,000,000 $32,100,000
Other $0 $0
Federal $3,200,000
State $800,000
Other $0
Total
$2,500,000 $6,400,000 Total $12,758,000 Total
$0 $129,289
Total $0
$1,950,000
Total
$0
$3,750,000 Total
$20,000
$60,000
Total $5,000,000 Total
$7,000
$800,000
Total $70,200,000 Total
$30,000,000
$32,100,000
Totat $4,000,000 Page 148of 300
..'.,' ..-''
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5
FUlton
Project: 0003539 Type Work: Transit Projects Descp: GRTA PURCHASE OF CLEAN FUEL BUSES FOR
EXPRESS SERVICE-PH 1 Length: 0.00
TIP#: AR-375D
Project: 0003540 Type Work: Transit Projects Descp: GRTA PURCHASE OF CLEAN FUEL BUSES FOR
EXPRESS SERVICE-PH 2 Length: 0.00
TlP#: AR-375D
Project: 0003542 Type Work: Transit Projects
Descp: GRTA FACILITIES TO SUPPORT EXPRESS BUS
SERVICE-YEAR 2
Length: 0.00
TlP#: AR-392
Project: 0003543 Type Work: Transit Projects
Descp: GRTA FACILITIES TO SUPPORT EXPRESS BUS
SERVICE-YEAR 3
Length: 0.00
TIP#: AR-393
Project: 0003544 Type Work: Transit Projects Descp: GRTA-SMART CARD STUDY & IMPLEMENTATION
EXPRESS BUS SERVICE Length: 0.00
TlP#: AR-394A&B
Project: 0003547 Type Work: Transit Projects
Descp: GRTA FACILITIES TO SUPPORT ACCESS
PROGRAM - 2006
Length: 0.00
TlP#: AR-399
Project: 0003548 Type Work: Transit Projects
Descp: GRTA FACILITIES TO SUPPORT ACCESS
PROGRAM - 2007
Length: 0.00
TlP#: AR-400
Project: 0003572 Type Work: Transit Projects
Descp: GRTA PURCHASE OF VEHICLES FOR ACCESS
PROGRAM PHASE 2
Length: 0.00
TlP#: AR-397A
Project: 0003573 Type Work: Transit Projects
Descp: GRTA FACILITIES TO SUPPORT ACCESS
PROGRAM - 2005
Length: 0.00
TlP#: AR-398
Project: 0003764 Type Work: Intersection Improvement
Descp: SR 140/HOLCOMB BRIDGE RD @ 4 LOCS FM OLD ROSWELL TO BARNWELL Length: 1.60
LUMP SUM PROJECT
TlP#: LUMP
Project: 0003765 Type Work: Intersection Improvement Descp: BELL ROAD AT ROGERS CIRCLE ROAD
Length: 0.20 TlP#: FN207
Phase Fund CST Bond
Year 2005
Phase Fund CST Bond
Year 2006
Phase Fund
PE
Bond
ROW Bond
CST Bond
Phase Fund CST Bond
Year 2005 2005 2005
Year 2006
Phase Fund
PE
EARMK
PE
Bond
ROW Bond
CST Bond
Phase Fund CST Bond
Year 2005 2005 2006 2007
Year 2006
Phase Fund CST Bond
Year 2007
Phase Fund CST Bond CST Bond
Year 2005 2006
Phase Fund CST Bond
Year 2005
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase PE ROW CST
Fund HPP HPP HPP
Year Underway
2006 2007
Federal $0
State $1,319,900
Federal $0
State $20,774,600
Federal $0 $0 $0
State $2,000,000 $4,000,000 $14,000,000
Federal $0
State $10,456,250
Federal $700,000
$0 $0 $0
Federal $0
State $0
$218,000 $1,398,000
$94,712
State $375,000
Federal $0
State $375,000
Federal $0 $0
State $1,500,000 $1,500,000
Federal $0
State $1,500,000
Federal $117,000
State $13,000
Federal
$440,000 $1,200,000
State
$0 $0
Other $0
Other $0
Other $0 $0 $0
Other $0
Other $0 $0 $0 $0
Other $0
Other $0
Other $0 $0
Other $0
Other $0
Other $110,000 $300,000
Total $1,319,900
Total $20,774,600
Total $2,000,000 $4,000,000 $14,000,000
Total $10,456,250
Total $700,000 $218,000 $1,398,000
$94,712 Total $375,000
Total $375,000
Total $1,500,000 $1,500,000
Total $1,500,000
Total $130,000
Total $550,000 $1,500,000
Page 149 of 300
STATE TRANSPORTATlON IMPROVEMENT PROGRAM 2/7/2005
Fulton
Project: 0003769 Type Work: Intersection Improvement Descp: KIMBALL BRIDGE ROAD AT WATERS ROAD
Length: 0.20 TIP#: FN-215
Project: 0003775 Type Work: Intersection Improvement
Descp: SR 120/ ABBOnS BRIDGE ROAD @ PARSONS
ROAD
Length: 0.20
T1P#: FN217
Project: 0004166 Type Work: Intersection Improvement
Descp: SR 3/NORTHSIDE DRIVE AT CS 53/COLLIER
RD;CS364; 38; 6; 135
Length: 2.25
LUMP SUM PROJECT
TIP#: AR-IIS
Project: 0004386 Type Work: Transit Facilities Descp: GRTA NW CORRIDOR TRANSIT G.O.
Length: 0.00 T1P#: AR-251A3
Project: 0004388 Type Work: Transit Projects
Descp: GRTA PURCHASE OF VEHICLES FOR ACCESS
PROGRAM - PHASE 3
Length: 0.00
T1P#: AR3978
Project: 0004390 Type Work: Bicycle/Ped. Facility Descp: PEACHTREE STREET FROM 10TH STREET TO 1-85
Length: 1.37 T1P#: AT200
Project: 0004393 Type Work: Bicycle/Ped. Facility
Descp: FOURTEENTH STREET FROM WEST PEACHTREE
ST TO PIEDMONT AVE
Length: 0.57
TIP#: AT-205
Project: 0004394 Type Work: Bicycle/Ped. Facility Descp: DOWNTOWN ATLANTA PEDESTRIAN CORRIDOR
IMPROVEMENTS Length: 0.00
TIP#: AT-206
Project: 0004396 Type Work: Signing Descp: DOWNTOWN AND MIDTOWN ATLANTA
WAYFINDING SIGNAGE SYSTEM Length: 0.00
T1P#: AT-209
Project: 0004397 Type Work: Intersection Improvement Descp: MIDTOWN ATLANTA SIGNAL AND INTERSECTION
IMPROVEMENTS Length: 0.00
TIP#: AT-210
Project: 0004399 Type Work: Intersection Improvement Descp: INTERSECTION IMP AT LINDEN/PONCE DE
LEON/SPRING/PIEDMONT Length: 1.55
T1P#: AT212
Phase Fund
PE
HPP
ROW HPP
CST HPP
Year Underway
2006 2007
Phase Fund
PE
HPP
ROW HPP
CST HPP
Year Underway
2005 2006
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund ROW Bond ROW Bond
Year 2005 After 2007
Phase Fund CST Bond CST Bond
Year 2005 2006
Phase Fund
PE
Local
ROW Local
CST Bond
Phase Fund
PE
Local
CST Bond
Year LOCL LOCL 2005
Year LOCL 2007
Phase Fund PE Bond ROW Local CST Bond
Year Underway
LOCL 2006
Phase Fund
PE
Bond
CST Bond
Year Underway
2006
Phase Fund CST Bond
Year 2006
Phase Fund
PE
Local
ROW Bond
CST Bond
Year LOCL 2006 2007
Federal
$200,000 $560.000
State
$0 $0
Other
$50.000 $140,000
Federal
$200,000 $560,000
State
$50.000 $140.000
Other
$0 $0
Federal
$0 $2.557.800
State
$0 $284.200
Other
$808.200 $0
Federal $0
State $20.000,000
Other $0
Federal $0 $0
State $1.500.000 $1.500,000
Other $0 $0
Federal $0 $0 $0
State $0 $0
$5.167.266
Other $396.136
$0 $1.291,817
Federal $0 $0
State $0
$3.585.354
Other $314,000 $896,338
Federal
$0 $0
State
$0 $2,520.000
Other
$0 $630.000
Federal $0
State $2,224.800
Other $556,200
Federal $0
State $1.600.000
Other $400.000
Federal $0 $0 $0
State $0
$800,000 $1.700.000
Other $148,750 $200,000 $425,000
Total $250,000 $700.000
Total $250.000 $700,000
Total $808,200 $2.842.000
Total $20.000,000
Total $1.500.000 $1.500.000
Totat $396,136
$0 $6,459.083
Total $314,000 $4,481.692
Total $0
$3,150,000
Total $2.781,000
Total $2.000.000
Total $148,750 $1.000.000 $2.125.000
Page 150 of 300
...'''
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Fulton
Project: 0004429 Type Work: Widening
Descp: MCGINNIS FERRY ROAD FROM SARGENT ROAD
TO CHATTAHOOCHEE RIVER
Lanes: Exist. 2 Prop. 4
Length: 5.06
TlP#: FN-2338
Project: 0004436 Type Work: Special Studies
Descp: LIVABLE CENTERS INITIATIVE IMPLEMENTATION
YEAR 3 (LCI PROJ)
Length: 0.00
LUMP SUM PROJECT
TlP#: AR361C
Project: 0004440 Type Work: Special Studies
Descp: CONGESTION MANAGEMENT SYSTEM UPDATE
FY 2005
Length: 0.00
TIP#: AR-468A
Project: 0004453 Type Work: Bicycle/Ped. Facility Descp: MOUNT VERNON HIGHWAY FROM POWERS
FERRY RD TO LAKE FORREST RD Length: 2.27
TIP#: FNARBPOI
Project: 0004460 Type Work: Streetscapes
Descp: LEE STREET STREETSCAPE FM WHITE STREET
EXT TO 120 FY 04 LCI
Length: 0.00
LUMP SUM PROJECT
TlP#: AT AR 229
Project: 0004461 Type Work: Landscaping
Descp: RALPH DAVID ABERNATHY BLVD FM ASHBY ST TO LEE ST LCI PROJ Length: 1.68
LUMP SUM PROJECT
TIP#: ATAR231
Project: 0004463 Type Work: Streetscapes
Descp: ASHBY STREET STREETSCAPE FY 2004 LCI
PROJECT
Length: 0.00
LUMP SUM PROJECT
TIP#: AT AR 234
Project: 0004464 Type Work: Bicycle/Ped. Facility
Descp: PEACHTREE ST PED CROSSING AT POPLARIWALTONIWALL FY04LCI Length: 0.00
LUMP SUM PROJECT
TIP#: AT AR 235
Project: 0004466 Type Work: Landscaping
Descp: GREENBRIAR PARKWAY IMPROVEMENTS FY
2004 LCI PROJECT
Length: 0.00
LUMP SUM PROJECT
TIP#: AT AR 237
Project: 0004467 Type Work: Intersection Improvement
Descp: BARGE ROAD AT CAMPBELLTON ROAD FY 2004
LCI PROJECT
Length: 0.20
LUMP SUM PROJECT
TlP#: AT AR 238
Project: 0004468 Type Work: Intersection Improvement
Descp: SR 154/SR 166/LANGFORD AT CAMPBELLTON RD
FY 2004 LCI PROJECT
Length: 0.00
LUMP SUM PROJECT
TlP#: AT AR 239
Phase Fund ROW Bond CST RRBS
Year 2005 2006
Federal $0 $0
State $8,000,000 $12,600,000
Phase Fund CST STP
Year LUMP
Federal $31,920,000
State $7,980,000
Phase Fund CST STP
Year 2005
Federal $160,000
State $0
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL 2006
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $0 $0
$531,200
Federal
$0 $306,700
Federal
$548,000
State $0 $0 $0
State
$0 $0
State
$0
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Federal $0
$341,800
Federal $0
$144,000
Federal $0
$1,526,400
Federal $0
$224,000
Federal $0
$96,000
State $0 $0
State $0 $0
State $0 $0
State $0 $0
State $0 $0
Other $0 $0
Other $0
Other $40,000
Other $0
$60,000 $132,800
Other $0
$76,680
Other $137,000
Other $0
$85,450
Other $0
$36,000
Other $0
$429,300
Other $0
$64,800
Other $0
$27,000
Total $8,000,000 $12,600,000
Total $39,900,000
Total $200,000
Total $0
$60,000 $664,000
Total $0
$383,380
Total $685,000
Total $0
$427,250
Total $0
$180,000
Total $0
$1,955,700
Total $0
$288,800
Total $0
$123,000
Page 151 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2!712QQ5
Fulton
Project: 0004489 Type Work: Miscellaneous Improvement Descp: FRAMEWORK START UP FUNDS
TRANSPORTATION MTG ASSOCIATION FY05 Length: 0.00
TlP#: AR-71IA
Project: 0004490 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNER-REG TRANS DEMAND
MGT MEDIAIINCENT/EMPL SVC Length: 0.00
TlP#: AR-71IB
Project: 0004491 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS - TDM RESEARCH EVAL
& MEASUREMENT FY 2005 Length: 000
TlP#. AR-715A
Project: 0004493 Type Work: Streetscapes
Descp: MARIETTA ST STREETSCAPE FM W MARIETTA ST
TO ATLANTA CITY LMT
Length: 0.00
TlP#: AT-AR-BP30
Project: 0004512 Type Work: Bicycle/Ped. Facility Descp: HERMI'S BRIDGE AT CHATTAHOOCHE RIVER
NEAR WEST PACES FERRY Length: 0.00
TlP#: FN-193
Project: 0004518 Type Work: Ride Sharing Descp: LOCAL TRANSPORTATION MANAGEMENT
(RIDESHARING) PROGRAM- FY 05 Length: 0.00
TIP#: AR-70IA
Project: 0004627 Type Work: Intersection Improvement
Descp: PEACHTREE ST/SR 9 AT BEVERLY ROADIWEST
PEACHTREE ST
Lanes: Exist. 2 Prop. 4
Length: 0.20
TlP#: AT-218
Project: 0004634 Type Work: Widening
Descp: MCGINNIS FERRY ROAD FM SARGENT ROAD TO
MCFARLAND ROAD
Lanes: Exist. 2 Prop. 4
Length: 7.80
TlP#: FN-233A
Project: 0004651 Type Work: Bicycle/Ped. Facility Descp: TENTH STREET FROM PEACHTREE STREET TO
JUNIPER STREET Length: 0.20
TlP#: AT204
Project: 0004689 Type Work: Median Work Descp: SR 141/PTREE RD CORRIDOR IMP-MAPLE DRIVE
TOSR 400 Length: 0.42
TlP#: AT-215A&B
Project: 0004831 Type Work: Streetscapes Descp: PERIMETER CTR STREETS CAPE FM MT VERNON
TO ASHFORD DUNWOODY Length: 0.95
TlP#: DK-323
Phase Fund PE CMAQ
Phase Fund PE CMAQ
Phase Fund PE CMAQ
Phase Fund PE Local ROW Local CST CMAQ
Phase Fund
PE
Local
CST CMAQ
Phase Fund
PE
CMAQ
Phase Fund PE STP ROW Local CST STP
Phase PE ROW CST
Fund Local Local STP
Phase Fund PE Local CST Bond
Phase Fund PE STP ROW Bond ROW Q68 CST Bond
Phase PE ROW CST
Fund Local Local Bond
Year 2005
Year 2005
Year 2005
Year LOCL LOCL 2005
Year LOCL 2006
Year 2005
Year Underway
LOCL 2007
Year LOCL LOCL 2007
Year LOCL 2006
Year 2005 2005 Underway 2005 Year LOCL LOCL 2005
Federal $400,000
State $0
Other $100,000
Federal $6,080,000
State $0
Other $1,520,000
Federal $680,000
State $0
Other $170,000
Federal $0 $0
$1,000,000
Federal $0
$320,000
State $0 $0 $0
Other $150,000 $200,000 $250,000
State $0 $0
Other $100,000
$80,000
Federal $1,100,000
State $0
Other $0
Federal
$0 $1,360,000
State
$0 $340,000
Other
$0 $0
Federal $0 $0
$20,177 ,600
State $0 $0
$5,044,400
Other $2,500,000 $5,000,000
$0
Federal $0 $0
State $0
$979,699
Other $320,000 $253,670
Federal $4,500 $0
State $500
$4,267,000
$0
Federal $0 $0 $0
$2,951,200
State $0 $0
$2,406,400
Other $0 $0
$737,800
Other $192,000 $150,000 $601,600
Total $500,000
Total $7,600,000
Total $850,000
Total $150,000 $200,000 $1,250,000
Total $100,000 $400,000
Total $1,100,000
Total $0
$1,700,000
Total $2,500.000 $5,000,000 $25,222,000
Total $320,000 $1.233,369
Total $5.000
$4.267.000 $3,689,000
Total $192,000 $150,000 $3,008,000
Page 152 of 300
...'''
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005
Fulton
Project: 0005030 Type Work: Transit Projects Descp: GRTA ACTIVITY CENTER SHUTTLE
SYS-OPERATING ASSIST. FY 2005 Length: 0.00
TIP#: AR-650C'
Project: 0005296 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS AT VARIOUS LOCATIONS ALONG SR 14 Length: 0.00
LUMP SUM PROJECT
TIP#: Lump
Project: 0005409 Type Work: Intersection Improvement Descp: CRABAPPLE ROAD AT CHAFFIN ROAD
Length: DAD
TIP#: FN-211
Project: 0005428 Type Work: Intersection Improvement
Descp: OLD ALABAMA ROAD AT OLD ALABAMA
CONNECTOR
Length: 0.20
TfP#: FN-216
Project: 0005448 Type Work: Intersection Improvement
Descp: SR 3721BIRMINGHAM HWY @ PROVIDENCE RD &
NEW PROVIDENCE RD
Length: 0040
TfP#: FN-209
Project: 0005748 Type Work: Railroad Crossing Descp: CS 60221HENRY FORD II AVENUE @ NS#717993W
LUMP SUM PROJECT
Length: 0040 TIP#: Lump
Project: 0005910 Type Work: Bicycle/Ped. Facility
Descp: SIDEWALK ON HAMMOND DRIVE & SANDY SPRING CIRCLE- LCI PROJECT Length: 0.31
LUMP SUM PROJECT
TIP#: Lump
Project: 0005945 Type Work: Realignment Descp: 14TH ST FM SPRING ST TO WEST PEACHTREE ST
Length: 0.20 TfP#: AT-189
Project: 0006239 Type Work: Miscellaneous Improvement
Descp: LUMP SUM LIVABLE CENTERS INITIATIVE FOR PE
RW OR CST: FY05
Length: 0.00
TfP#: AR810B
Project: 0006240 Type Work: Miscellaneous Improvement
Descp: LUMP SUM LIVABLE CENTERS INITIATIVE FOR PE
RW OR CST: FY06
Length: 0.00
TIP#: AR-81IA
Project: 0006241 Type Work: Miscellaneous Improvement
Descp: LUMP SUM LIVABLE CENTERS INITIATIVE FOR PE
RW OR CST: FY07
Length: 0.00
TIP#: AR-81IB
Phase Fund CST CMAQ
Phase Fund CST STP
Phase PE ROW CST
Fund HPP HPP HPP
Phase PE ROW CST
Fund HPP HPP HPP
Phase PE ROW CST
Fund HPP HPP HPP
Phase Fund CST STP
Phase Fund PE STP CST STP
Phase Fund ROW NHS CST NHS
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Year 2005
Year LUMP
Year Underway
2006 2007
Year Underway
2006 2007
Year Underway
2006 2007
Year LUMP
Year Underway
LUMP
Year 2005 2006
Year 2005
Year 2006
Year 2007
Federal $1,200,000
Federal $277,600
Federal $80,000
$200,000 Federal $120,000 $536,000 Federal $200,000 $640,000 Federal $175,000
Federal $1,146,400
Federal $2,560,000 $1,360,000
Federal $36,000,000
Federal $10,000,000
Federal $12,000,000
State $0
Other $300,000
State $69,400
Other $0
State
$0 $0
Other
$20,000 $50,000
State
$0 $0
Other
$30,000 $134,000
State
$50,000 $160,000
Other
$0 $0
State $0
Other $0
State $0
Other $286,600
State $640,000 $340,000
Other $0 $0
State $0
Other $9,000,000
State $0
Other $2,500,000
State $0
Other $3,000,000
Total $1.500,000
Total $347,000
Total $100,000 $250,000 Total $150,000 $670,000 Total $250,000 $800,000 Total $175,000
Total $1,433,000
Total $3,200.000 $1,700,000
Total $45,000,000
Total $12,500,000
Total $15,000,000
Page 153 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Fulton
Project: 0006259 Type Work: Landscaping Descp: PIEDMONT AVE FM GA STATE MARTA TO JOHN
WESLEY DOBBS AVE LCI Length: 0.56
LUMP SUM PROJECT
TlP#: AT-227B
Project: 0006260 Type Work: Sidewalks
Descp: HEADLAND ST FM GREENBRIAR PKWY TO CITY
LIMITS - LCI PROJECT
Length: 0.40
LUMP SUM PROJECT
TlP#: ATAR 243
Project: 0006261 Type Work: Intersection Improvement
Descp: BOLTON ROAD AT MARIETTA BOULEVARD - LCI
PROJECT
Length: 0.40
LUMP SUM PROJECT
TlP#: AT-AR 245
Project: 0006267 Type Work: Sidewalks
Descp: STREETSCAPE ON MEDICAL CENTER FM 1285 TO
GLENRIDGE CONN-LCI
Length: 0.20
LUMP SUM PROJECT
TIP#: FN-AR 206
Project: 0006273 Type Work: Sidewalks
Descp: VIRGINIA AVE STREETSCAPE FM W CITY LIMITS
TO DOUG DAVIS- LCI
Length: 0.27
LUMP SUM PROJECT
TlP#: FS-AR 180
Project: 0006274 Type Work: Sidewalks
Descp: ALPHARETTA ST STREETSCAPE FM NORCROSS ST TO HOLCOMB BR - LCI Length: 1.28
LUMP SUM PROJECT
TIP#: FN-AR 208
Project: 0006332 Type Work: ATMS/ITS Descp: ATMS/I-85 S COMMUNIC/SURVEILANCE FM CAMP
CREEK PKWY TO SR 74 Length: 11.04
TIP#: AR-430
Project: 0006335 Type Work: ATMS/ITS
Descp: ATMS/SR 400 COMMUNIC/SURVEILANCE FM OLD
MIL TON TO SR 20
Length: 11.32
TIP#: AR-435A&B
Project: 0006396 Type Work: ATMS/ITS
Descp: ATMS/I-75 N RAMP METERS-HAR FROM 185 TO
WADE GREEN ROAD
Length: 8.02
TlP#: AR-438
Project: 0006397 Type Work: ATMS/ITS Descp: ATMS/I-85 N RAMP METERS-HAR FM BUFORD
HWY TO PLEASANT HILL Length: 16.43
TlP#: AR-439
Project: 0006398 Type Work: ATMS/ITS Descp: ATMS/SR 400 RAMP METERS-HAR FM 1-85TO OLD
MILTONPKWY Length: 19.58
TlP#: AR-440
Phase Fund PE STP CST STP
Year Underway
2007
Federal $988,000
State $0
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $200,000
State $0
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $800,000
State $0
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $70,400
$1,513,600
Federal $1,346,400
State $0 $0
State $0
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $2,011,200
State $0
Phase Fund PE NHS CST NHS
Year 2005 2006
Federal $120,000 $10,400,000
State $30,000 $2,600,000
Phase Fund PE NHS CST Bond
Year 2006 2007
Federal $120,000
$0
State $30,000 $11,000,000
Phase Fund PE NHS CST Bond
Year 2005 2006
Federal $28,000 $0
State $7,000
$2,000,000
Phase Fund PE NHS CST Bond
Year 2005 2006
Federal $40,000 $0
State $10,000 $3,000,000
Phase Fund PE NHS CST Bond
Year 2005 2006
Federal $20,000 $0
State $5,000
$1,500,000
Other $247,000
Other $50,000
Other $200,000
Other $17,600 $378,400 Other $336,600
Other $502,800
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Total $1,235,000
Total $250,000
Total $1,000,000
Total $88,000 $1,892,000 Total $1,683,000
Total $2,514,000
Total $150,000 $13,000,000
Total $150,000 $11,000,000
Total $35,000 $2,000,000
Total $50,000 $3,000,000
Total $25,000 $1,500,000
Page 154 of 300
..t')
STATE TRANSPORTATION IMPROVEMENT PROGRAM 27/2005
Fulton
Project: 0006399 Type Work: ATMS/ITS Descp: ATMS/ 1-75/85 RAMP METERS-HAR FM
UNIVERSITY AV TO 10TH ST Length: 4.83
TlP#: AR-441
Project: 0006401 Type Work: ATMS/ITS
Descp: ATMS/I-75 S RAMP METERS-HAR FM HUDSON BR
TO CLEVELAND AVE
Length: 17.35
TIP#: AR-443
Project: 0006402 Type Work: ATMS/ITS
Descp: ATMS/I-20 RAMP METERS-HAR FM THORNTON
RD TO EVANS MILL RD
Length: 30.30
TIP#: AR-444
Project: 0006428 Type Work: Transit Projects
Descp: 1-285 FROM CUMBERLAND TO PERIMETER
TRANSIT CORRIDOR
Length: 9.91
TlP#:
Project: 0006429 Type Work: Transit Projects
Descp: 1-285 FROM CUMBERLAND TO PERIMETER
TRANSIT CORRIDOR
Length: 0.00
TlP#:
Project: 0006457 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN
DOUGLAS/FULTON
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006570 Type Work: Streetscapes Descp: CASCADE-MAYS STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006571 Type Work: Streetscapes Descp: BOLTON/MOORES MILL STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0008572 Type Work: Streetscapes
Descp: ANSLEY PARK PEDESTRIAN & STREETSCAPE
PROJECT
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0008573 Type Work: Streetscapes Descp: SIMPSON ROAD CORRIDOR STREETS CAPE
LUMP SUM PROJECT
Length: 7.28 TlP#:
Project: 0006574 Type Work: Streetscapes
Descp: DECATUR STREET PEDESTRIAN & STREETSCAPEIMPROVEMENTPROJECT Length: 2.67
LUMP SUM PROJECT
TIP#:
Phase Fund
PE
NHS
CST Bond
Year 2005 2006
Phase Fund
PE
NHS
CST Bond
Year 2006 2007
Phase Fund
PE
NHS
CST Bond
Year 2006 2007
Phase Fund
PE
Bond
PE
Bond
ROW Bond
CST Bond
Phase Fund
PE
Bond
CST Bond
Year 2005 2006 After 2007 After 2007
Year 2007 After 2007
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Federal $20,000 $0
State $5,000
$2,000,000
Federal $20,000 $0
State $5,000
$1,500,000
Federal $32,000 $0
State $8,000
$2,500,000
Federal $0 $0
State $5,000,000 $20,000,000
Federal $0
State $11,000,000
Federal $896,000
State $224,000
Federal $500,000
State $0
Federal $500,000
State $0
Federal $500,000
State $0
Federal $600,000
State $0
Federal $700.000
State $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $125,000
Other $125,000
Other $125,000
Other $150,000
Other $175,000
Total $25,000 $2,000.000
Total $25.000 $1,500,000
Total $40.000 $2,500.000
Total $5,000,000 $20,000,000
Total $11.000,000
Total $1.120,000
Total $625,000
Total $625,000
Total $625,000
Total $750,000
Total $875.000
Page 155 of 300
STATE TRANSPORTATlON IMPROVEMENT PROGRAM 2012005
Fulton
Project: 0006575 Type Work: Streetscapes
Descp: ATLANTA METROPOLITAN COLLEGE ENTRYWAY IMPROVEMENT Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006576 Type Work: Streetscapes
Descp: DOWNTOWN EAST POINT STREETSCAPE
PROJECT - PHASE II
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006582 Type Work: Multi-use Trail Descp: BIG CREEK GREENWAY EXTENSION
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0008644 Type Work: Streetscapes Descp: UNION CITY PEDESTRIAN SYSTEM - PHASE II
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006652 Type Work: Streetscapes Descp: CRABAPPLE STREETSCAPE - PHASE II
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006853 Type Work: Multi-use Trail Descp: JOHN LEWIS PLAZA - PHASE II
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006657 Type Work: Intersection Improvement Descp: MT VERNON HWY @ 5 LOCS & PEACHTREE
DUNWOODY RD @NORTHPARK PL Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006683 Type Work: Median Work Descp: SR 141/PTREE RD CORRIDOR IMP FM SR 400 TO
ROXBORO ROAD Length: 1.33
TlP#:
Project: 0006684 Type Work: Median Work Descp: SR 141/PTREE RD CORRIDOR IMP FM
SHADOWLAWN AVE TO MAPLE DR Length: 1.33
TlP#:
Project: 0006688 Type Work: Widening Descp: 1-85 NB VIADUCT @ GA 400 NB - EXIT LANE
Lanes: Exist. 11 Prop. 12
Length: 0.47 TlP#: AT-AR-212A
Project: 0006717 Type Work: Bicycle/Ped. Facility Descp: EAST ATLANTA VILLAGE STREETSCAPES
Length: 0.00 TlP#: AT220
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund
PE
STP
ROW Local
CST STP
Phase Fund ROW Local CST STP CST STP
Phase Fund ROW Local CST Bond
Phase Fund PE NHS CST NHS
Phase Fund PE Local CST STP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP LOCL LUMP
Year LOCL LUMP 2007
Year LOCL 2005
Year 2005 2006
Year LOCL 2007
Federal $200,000
State $0
Other $50,000
Federal $500,000
State $0
Other $125,000
Federal $300,000
State $0
Other $75,000
Federal $500,000
State $0
Other $125,000
Federal $500,000
State $0
Other $125,000
Federal $43,200
State $0
Other $10,800
Federal $1,600 $0
$480,000
Federal $0
$1,338,300 $3,442,875
Federal $0
$604,000
State $400 $0
$120,000
Other $0 $0
$1,800,000
State $0
$148,700 $0
Other $12,510,000
$0 $860,719
State $0
$151,000
Other $2,569,000
$0
Federal $60.000
$6,000.000
State $15,000 $1.500,000
Other $0 $0
Federal $0
$800,000
State $0 $0
Other $277,500 $200,000
Total $250,000
Total $625,000
Total $375,000
Total $625,000
Total $625,000
Total $54,000
Total $2,000 $0
$2,400,000
Total $12,510,000
$1,487.000 $4,303,594
Total $2.569,000
$755,000
Total $75,000 $7,500.000
Total $277,500 $1,000,000
Page 156 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Fulton
Project: 0006718 Type Work: Bicycle/Ped. Facility Descp: BICYCLE/PEDESTRIAN & TRAFFIC CALMING
ENHANCEMENTS @ SEV LOCS Length: 0.00
TIP#: AT-222A
Project: 0006727 Type Work: ATMS/ITS Descp: SR 9/ROSWELL ROAD FM ABERNATHY ROAD TO
FORSYTH COUNTY LINE Length: 17.90
TIP#: FN-199
Project: 0006728 Type Work: Streetscapes Descp: ROSWELL ROAD STREETSCAPE
Length: 0.00 TIP#: FN-AR-BPIO
Project: 0006729 Type Work: Special Studies
Descp: SOUTH FULTON PARKWAY ACCESS
MANAGEMENT PLAN
Length: 000
TIP#: FS-196
Project: 0006755 Type Work: Special Studies Descp: SR 6/CAMP CREEK PKWY FM 1-85TO W HIRAM
PKWY- CORRIDOR STUDY Length: 29.07
TIP#: AR-465
Project: 0006789 Type Work: Special Studies Descp: DOWNTOWN PARKING MANAGEMENT PROGRAM
Length: 0.00 TIP#: AT-223
Project: 0006790 Type Work: Signals Descp: ATLANTA INTERSECTION TIMING & LOOP
DETECTOR INSTALLATION Length: 0.00
TIP#: AT-224
Project: 0006817 Type Work: ATMS/ITS Descp: PERIMETER CENTR FIBER OPTIC
INTERCONNECTION@ SEV LOCS-FUL TON Length: 0.00
TIP#: FN-200
Project: 0006818 Type Work: ATMS/ITS
Descp: WINDWARD PKWY TRAFFIC SIGNAL
INTERCONNECTIONS
Length: 0.00
TIP#: FN-201
Project: 0006819 Type Work: ATMS/ITS
Descp: NORTH POINT PKWY TRAFFIC SIGNAL
INTERCONNECTIONS
Length: 0.00
TIP#: FN202
Project: 0006820 Type Work: ATMSIITS
Descp: SR 140/HOLCOMB BRIDGE RD FM SR 9 TO CR
107IBARNWELL RD
Length: 5.85
TIP#: FN-203
Phase Fund PE Local CST STP
Year LOCL 2006
Phase Fund PE Local CST STP
Year LOCL 2006
Phase Fund
PE
Local
CST STP
Year LOCL 2007
Phase Fund
PE
STP
Year 2006
Phase Fund CST STP
Year 2006
Phase Fund CST STP
Year 2006
Phase Fund CST CMAQ
Year 2006
Phase Fund CST CMAQ
Year 2007
Phase Fund CST CMAQ
Year 2006
Phase Fund CST CMAQ
Year 2006
Phase Fund CST CMAQ
Year 2006
Federal $0
$1,000,000
State $0 $0
Federal $0
$2,800,000
State $0 $0
Federal $0
$697,600
State $0 $0
Federal $320,000
State $0
Federal $600,000
State $0
Federal $140,000
State $0
Federal $800,000
State $0
Federal $539,200
State $0
Federal $920,000
State $0
Federal $856,000
State $0
Federal $600,000
State $0
Other $100,000 $250,000
Other $525,000 $700,000
Other $100,000 $174,400
Other $80,000
Other $150,000
Other $35,000
Other $200,000
Other $134,800
Other $230,000
Other $214,000
Other $150,000
Total $100,000 $1,250,000
Total $525,000 $3,500,000
Total $100,000 $872,000
Total $400,000
Total $750,000
Total $175,000
Total $1,000,000
Total $674,000
Total $1,150,000
Total $1,070,000
Total $750,000
Page 157 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Fulton
Project: 0006821 Type Work: ATMS/ITS Descp: SR 92 FM SR 9 TO COBB COUNTY LINE
Length: 19.17 TlP#: FN-204
Project: 0006822 Type Work: Sidewalks
Descp: SIDEWALKS ALONG CR 4176/CASCADE RD & CS
1057IBEN E MAYS
Length: 0.00
TIP#: AT-AR-BP30
Project: 0006841 Type Work: Special Studies Descp: MARTA -INNER CORE ALTERNATIVES ANALYSIS
Length: 0.00 TIP#: AR-450A&B
Project: 0006842 Type Work: Transit Facilities Descp: MARTA - HE HOLMES TRANSIT STATION LCI
IMPLEMENTATION PROJECT Length: 0.00
TlP#: M-AR-280
Project: 0006845 Type Work: Transit Projects
Descp: MARTA - AUTOMATED FARE COLLECTION
SYSTEM - FY 2006
Length: 0.00
TlP#: M-AR-282B
Project: 0006846 Type Work: Transit Projects
Descp: MARTA - AUTOMATED FARE COLLECTION
SYSTEM - FY 2007
Length: 0.00
TIP#: M-AR-282C
Project: 0006848 Type Work: Transit Facilities Descp: MARTA - HAMILTON GARAGE CNG FACILITY
Length: 0.00
TlP#: M-AR-285
Project: 0006850 Type Work: Transit Projects Descp: MARTA - CLEAN FUEL BUS PROCUREMENT - FY
2006 Length: 0.00
TlP#: M-AR-286B
Project: 0006912 Type Work: Bicycle/Ped. Facility Descp: OLD NATIONAL HWY TRANSIT ORIENTED
DEVELOPMENT IMPLEMENTATION Length: 0.00
TlP#: FS-195
Project: 0006913 Type Work: Median Work Descp: CR 1505/0AKLEY INDUSTRIAL BLVD FM
FAYETTEVILLE RD TO SR 138 Length: 1.71
TlP#: FS-202BI
Project: 0008952 Type Work: Roadway Project Descp: SIMPSON STREET/JONES AVENUE FM
NORTHSIDE DR TO LUCKIE ST Length: 0.48
TlP#: AT-188B
Phase Fund CST CMAQ
Year 2007
Federal $400,000
State $0
Other $100,000
Phase Fund CST CMAQ
Year 2007
Federal $1,040,000
State $0
Other $300,000
Phase Fund PE Local PE Local ROW STP ROW STP CST STP CST STP Phase Fund CST STP
Year 2005 2006 2006 After 2007 After 2007 After 2007 Year 2007
Federal $0 $0
$5,000,000
Federal $106,160
State
Other
$0
$0
$0
$0 $100,000,000
State $0
Other $26,540
Phase Fund CST STP
Year 2006
Federal $8,000,000
State $0
Other $2,000,000
Phase Fund CST STP
Year 2007
Federal $8,000,000
State $0
Other $2,000,000
Phase Fund CST STP
Year 2006
Federal $5,000,000
State $0
Other $1,000,000
Phase Fund CST STP
Year 2006
Federal $2,000,000
State $0
Other $500,000
Phase Fund
PE
Local
ROW Local
CST STP
Phase Fund
PE
Local
ROW Local
CST STP
Phase Fund CST Bond
Year LOCL LOCL 2007
Year LOCL LOCL 2007
Year 2005
Federal $0 $0
$1.000,000
State $0 $0 $0
Other $200,000 $200,000 $250,000
Federal $0 $0
$2,960,000
State $0 $0 $0
Other $320,000 $500,000 $740,000
Federal $0
State $4.618,400
Other $1,154.600
Total $500,000
Total $1,340,000
Total $0
$105,000.000
Total $132,700
Total $10.000,000
Total $10.000,000
Total $6,000,000
Total $2,500,000
Total $200,000 $200,000 $1,250,000 Total $320.000 $500,000 $3.700.000 Total $5,773,000
Page 158 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM Za/2QQ5
Fulton
Project: 0007096 Type Work: Multi-use Trail Descp: CR 1385/BUFFINGTON RD FM 1-85 TO US
29/ROOSEVELT HWY Length: 1.99
TlP#: FS-AR-BP08
Project: 0007133 Type Work: Miscellaneous Improvement
Descp: VARIOUS IMPROVEMENTS IN FULTON COUNTY -
FY 2006
Length: 0.00
TIP#: FN-235
Project: 713330. Type Work: Ramp
Descp: 1285 SOUTH TO 120 WEST INTCHG RCST; WIDEN
&CD Lanes: Exist. 2
Prop. 6
Length: 3.12
TIP#: AT-AR-178
Project: 713370. Type Work: ATMSIITS
Descp: ATMS/I285 SURVEIL FM 1-20 W IN FUL TN N TO
1-75 IN COBB
Length: 6.57
TlP#: AR-279
Project: 713371. Type Work: ATMS/ITS
Descp: ATMS/I-285 SURVEIL FM 1-85/UNION CITY NORTH
TO 1-20WEST
Length: 10.72
TlP#: AR-295
Project: 713372. Type Work: ATMS/ITS
Descp: ATMS/I-285 SURVEIL FM 1-85/UNION CITY-FULTN E
TO 1-75/CLAYTN
Length: 4.11
TlP#: AR-469
Project: 713405- Type Work: ATMS/ITS
Descp: ATMS/I-285 RAMP METERS-HAR FM 1-75IN COBB
E TO 1-85 IN DEK
Length: 13.17
TIP#: AR-241
Project: 713620. Type Work: Widening
Descp: 1-20 FM SR 6ITHORNTON RD/DOUGLAS TO
FULTON INDUST BLVD/FULTO
Lanes: Exist. 6 Prop. 8
Length: 4.94
TIP#: DO-AR-057
Project: 713630. Type Work: Widening Descp: 1-20 FM FULTON INDUSTRIAL BLVD EAST TO 1-285
Lanes: Exist. 8 Prop. 10
Length: 1.72 TlP#: AR-243
Project: 714000 Type Work: Interchange Descp: 1-285 FROM SR 400 TO N SHALLOWFORD RD
Lanes: Exist. 4 Prop. 6
Length: 3.06 TIP#: DK-AR-219
Project: 714080 Type Work: ATMSIITS
Descp: ATMS/I-20 COMM/SURVEI FM SR 6ITHORNTON
RD TO 1-285/FULTON
Length: 5.99
TlP#: AR-447
Phase Fund CST CMAQ
Phase Fund CST HPP
Phase Fund
PE
1M
ROW 1M
CST 1M
Phase Fund
PE
STP
CST Bond
Phase PE PE CST
Fund NHS CMAQ NHS
Phase Fund
PE
NHS
CST NHS
Phase Fund
PE
NHS
CST NHS
Phase PE ROW CST
Fund NHS NHS NHS
Phase PE ROW CST
Fund NHS NHS NHS
Phase Fund
PE
1M
ROW 1M
ROW 1M
CST 1M
Phase Fund
PE
NHS
CST NHS
Year 2006
Year 2006
Year Underway
2007 After 2007
Year Underway
2005
Year 2005 Underway 2006
Year 2005 2006
Year 2005 2006
Year 2006 After 2007 After 2007
Year 2005 2007 After 2007
Year Underway Underway
2007 After 2007
Year 2005 2006
Federal $1,876,000
State $0
Federal $5,600,000
State $1,400,000
Federal $630,000
State $70,000
Federal
State
$0 $11,923,000
Federal $120,000
$6,772,480
State $30,000
$1,693,120
Federal $120,000 $3,361,600
State $30,000 $840,400
Federal $40,000
$1,200,000
State $10,000 $300,000
Federal '$160,000
State $40,000
Federal $120,000 $6,000,000
State $30,000 $1,500,000
Federal
State
$96,873,300 $10,363,700
Federat $120,000 $7,932,695
State $30,000 $1,983,174
Other $469,000
Total $2,345,000
Other $0
Total $7,000,000
Other $0
Total $700,000
Other $0
Total $11,923,000
Other $0
$0
Other $0 $0
Total $150,000
$8,465,600
Total $150,000 $4,202,000
Other $0 $0
Total $50,000
$1,500,000
Other $0
Total $200,000
Other $0 $0
Total $150,000 $7,500,000
Other
Total
$0 $107,237,000
Other $0 $0
Total $150,000 $9,915,869
Page 159 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2QQ5
Fulton
Project: 714115- Type Work: Barriers
Descp: 1-20 NOISE BARRIERS FM FULTON IND BLVD TO
H.E. HOLMES (N&Sl
Length: 3.57
TIP#: AR304
Project: 720570. Type Work: Median Work Descp: DL HOLLOWELL PKWY/SR 8 FM PROCTOR CRK
TO E OF CSX RR BRIDGE Length: 0.50
TlP#: AT-004
Project: 721000- Type Work: Widening
Descp: SR 120 FM STATE BRIDGE RD TO PEACHTREE
IND BLVD/GWINNETT Lanes: Exisl. 2 Prop. 4
Length: 6.54
TlP#: FNOO3A
Project: 721308- Type Work: Replace Bridge Descp: SR 140/HOUZE RD OVER LITTLE RIVER @
FULTON/CHEROKEE CO LINE Length: 0.50
TIP#: FN-232B
Project: 721700. Type Work: Replace Bridge Descp: CSX RR BRIDGE OVER SR 3/NORTHSIDE DR
Lenglh: 0.20 TIP#: AT-187
Project: 721960- Type Work: ATMS/ITS Descp: ATMS/ SR 400 COMMUNICAISURVEIL FM S OF 1-85
TO N OF )285 Length: 7.90
TlP#: AR-340
Project: 722010- Type Work: Widening
Descp: SR 400 FROM SR 140/HOLCOMB BRIDGE ROAD
TO MCFARLAND ROAD
Lanes: Exist. 6 Prop. 8
Lenglh: 8.99
TlP#: FN-AR-400A
Project: 722150- Type Work: HOV Lanes Descp: HOV NETWORK PATROUCONTRACT W/LOCAL
LAW ENFORCEMENT OFFICERS Length: 0.00
TIP#: AR-316
Project: 731860- Type Work: Replace Bridge Descp: SR 70/CASCADE-PALMETTO RD @ DEEP CREEK
7.5 MI N OF FAIRBURN Length: 0.27
TlP#: FS138
Project: 731861. Type Work: Replace Bridge Descp: SR 70/FULTON IND. BLVD. @ CAMP CREEK 7.9 MI
N OF FAIRBURN Length: 0.40
TIP#: FS190
Project: 731870- Type Work: Intersection Improvement Descp: SR 9 IN ROSWELL @ KING/CHATTAHOOCHEE
STREETS Length: 0.60
LUMP SUM PROJECT
TIP#: AR157
Phase Fund
PE
NHS
CST NHS
Year Underway
2005
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year Underway
2005 2006
Phase PE ROW CST
Fund STP STP STP
Year 2007 After 2007 After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006
Phase Fund
PE
NHS
CST NHS
Year Underway After 2007
Phase Fund CST TOL
Year 2005
Phase Fund
PE
NHS
CST Bond
Year 2005 2007
Phase Fund CST NHS
Year 2005
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
2005 2006 2006
Year Underway
2005 2006 2006
Year Underway
LOCL LUMP
Federal $6,203,200
State $1,550,800
Federal
$2,400,000 $7,299,200
State
$600,000 $1,824,800
Federal $1,584,800
State $396,200
Federal $80,000
$2,192,000
Federal
State $20,000 $548,000
State
Federal $0
State $6,331,506
Federal $1,600,000
$0
State $400,000 $33,000,000
Federal $1,600,000
State $400,000
Federal
$26,400 $909,600 $348,800 Federal
$24,800 $861,600 $1,493,600 Federal
$0 $1,075,320
State
$6,600 $227,400
$87,200 State
$6,200 $215,400 $373,400 State
$0 $119,480
Other $0
Other $0 $0
Other $0
Other $0 $0
Other
Other $0
Other $0 $0
Other $0
Other $0 $0 $0
Other $0 $0 $0
Other $0 $0
Total $7,754,000
Total $3,000,000 $9,124,000
Total $1,981,000
Total $100,000 $2,740,000 Total
Total $6,331,506
Total $2,000,000 $33,000,000
Total $2,000,000
Total $33,000 $1,137,000 $436,000 Total $31,000 $1,077,000 $1,867,000 Total
$0 $1,194,800
Page 160 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
FUlton
Project: 731875. Type Work: Replace Bridge Descp: NORTHSIDE DR @ NORFOLK SOUTHERN RR
NORTH OF BANKHEAD HWY Length: 0.21
TIP#: AT-186
Project: 742920.
Type Work: Bridge Rehab
Descp: CR 1319/MCGINNIS FERRY RD @
CHATTAHOOCHEE RVRlFORSYTH/GWINET
Lanes: Exist. 2 Prop. 4
Length: 0.60
TlPII: FN-233C
Project: 742976-
Type Work: Replace Bridge
Descp: CR 1385/BUFFINGTON ROAD @ MORNING CREEK
TRIB. E/UNION CITY
Length: 0.15
TlP#: FS-J~2
Project: 742985-
Type Work: Replace Bridge
Descp: SR 154/CASCADE-PALMETTO@ BEAR CREEK 3
MI N OF PALMETTO
Length: 0.27
TlP#: FS-J9J
Project: 751300-
Type Work: Widening
Descp: JOHNSON FERRY RD FM CHATTAHOOCHEE RV
TO ABERNATHY & BRIDGE
Lanes: Exist. 4 Prop. 6
Length: 1.23
TIP#: FN-023
Project: 751310. Type Work: Widening
Descp: ABERNATHY RD FM JOHNSON FERRY RD TO
ROSWELL RD Lanes: Exist. 2 Prop. 4
Length: 0.93
TIP#: FN03~B
Project: 751640. Type Work: Widening
Descp: ABERNATHY ROAD FROM SR 9/ROSWELL RD TO
SR400 Lanes: Exist. 4
Prop. 6
Length: 1.40
TlPII: FN-043
Project: 751650. Type Work: Widening
Descp: OLD ALABAMA RD/SR961 FM HOLCOMB BRIDGE
RD TO JONES BRIDGE RD
Lanes: Exist. 2 Prop. 4
Lenglh: 4.06
TIPII: FN123
Project: 751710 Type Work: Widening
Descp: SR 70/FULTON IND BLVD FM INTERCHANGE DR
TO SR 811NCL CRK BR Lanes: Exist. 2 Prop. 4
Length: 2.10
TIPII: FS-048
Project: 752015
Type Work: Replace Bridge
Descp: COURTLAND ST OVER CSX RR
Length: 0.10
TlPII: AT-070
Project: 752020 Type Work: Replace Bridge Descp: PEACHTREE ST@ GEORGIA RR & MARTA AT
UNDERGROUND ATLANTA Length: 0.50
TlPII: AT-069
Phase Fund
PE
STP
ROW STP
CST STP
Year 2007 After 2007 After 2007
Phase Fund
PE
STP
CST STP
Year 2005 2007
Federal $0
State $1,000,000
Federal $160,000 $1,600,000
State $40,000 $400,000
Phase PE ROW CST
Fund Bridge Local Bridge
Year Undeoway
LOCL 2006
Federal
$0 $708,800
State
$0 $177,200
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
STP
ROW STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW Bond
ROW STP
ROW Bond
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Year Undeoway
2005 2006 2006
Year Undeoway Undeoway
2005 2006
Year Undeoway
2006 2006 2006 2007 Year 2006 After 2007 After 2007
Federal
$16.800 $544,000 $288,000 Federal
State
$4,200 $136,000
$72,000 State
$16,898,400 $7,787,200
Federal
$4.224,600 $1,946,800
State
$0 $7,200.000
$0 $5.092,000
Federal $1.200,000
$50,975,000 $1,800,000 $4,000,000 $1,273,000 State $300,000
Phase Fund
PE
STP
ROW STP
CST STP
Year 2006 After 2007 After 2007
Federal $1,496,000
State $374.000
Phase PE ROW CST
Fund State State State
Year Undeoway Undeoway
2005
Federal
State
$0 $10,329,000
Phase Fund ROW STP CST Bridge
Year LOCL 2007
Federal $0
$636,000
State $0
$159,000
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Undeoway Undeoway
2005
Federal $2,893,600
State $723,400
Other $0
Other $0 $0
Other $500,000
$0
Other $0 $0 $0
Other
$0 $0 Other $0 $0 $0 $0 Other $0
Other $0
Other
$0
Other $400,000
$0
Other
$0
Total $1,000.000
Total $200,000 $2.000,000
Total $500,000 $886,000
Total $21,000 $680,000 $360.000 Total
$21,123,000 $9,734,000 Total
$50,975,000 $9,000,000 $4,000.000 $6,365.000 Total $1,500.000
Total $1,870.000
Total
$10,329.000
Total $400.000 $795,000
Total
$3,617,000
Page 161 of 300
STA TE TRANSPORTA TJON IMPROVEMENT PROGRAM 217/2005
Fulton
Project: 752075- Type Work: Intersection Improvement
Descp: SR 139/MLK JR DR FM HE HOLMES RD TO
BARFIELD AVE
Length: 0.56
TIP#: AT-079B
Project: 752520- Type Work: Replace Bridge Descp: CS 1985/MITCHELL STREET @ SOUTHERN
RAILROAD .2 MI W OF SR 3E Length: 0.29
TIP#. AT-097
Project: 752650- Type Work: Widening
Descp: HAYNES BRIDGE RD FM OLD ALABAMA RD TO
BIG CREEK Lanes: Exist. 2 Prop. 4
Length: 2.37
TIP#: FN-03IA
Project: 752660. Type Work: Widening
Descp: OLD ALABAMA RD FM JONES BRDG RD TO SR
141IMEDLOCK BRDG R Lanes: Exist. 2 Prop. 4
Length: 3.90
TIP#: FN-123B
Project: 752710- Type Work: Replace Bridge
Descp: CS 3498/ATLANTA RD @ CHATTAHOOCHEE
RIVER FULTON-COBB CO LINE
Lanes: Exist. 2 Prop. 4
Length: 0.60
TlP#: CO-104
Project: 752850. Type Work: Replace Bridge
Descp: SR 280/JAMES JACKSON PKWY @ CHATT.
RIVER-SOU RR & APPROACHES
Lanes: Exist. 2 Prop. 4
Length: 1.08
TIP#: AT-108A&B
Project: 752960. Type Work: Replace Bridge Descp: CR 186/HEMBREE ROAD@ FOE KILLER CREEK 2
MI SW OF ALPHARETTA Length: 0.20
TIP#: FN-174A&B
Project: 752970- Type Work: Replace Bridge Descp: CR 133210LD ROSWELL ROAD@ FOE KILLER
CREEK 2.7 MI S OF ALPH Length: 0.20
TIP#: FN-173B
Project: 753054- Type Work: Bicycle/Ped. Facility Descp: GLENRIDGE DRIeR 351 FM ROSWELL RD TO
GLENRIDGE CONN & MEDIAN Length: 1.16
TIP#: FN-I03
Project: 753255- Type Work: Intersection Improvement Descp: FAIRBURN RD FM GARRISON DR TO CSX RR &
SIDEWALKS; BIKE Length: 1.00
TIP#: FS-130
Project: 753280- Type Work: Sidewalks Descp: NEW HOPE RD/CR 473 FM DANFORTH RD TO
CASCADE RD Length: 0.44
TIP#: FS-AR-BP06
Phase Fund
PE
STP
ROW STP
CST STP
Year 2006 2007 After 2007
Federal $103,200 $2,032,000
State $25,800 $508,000
Other $0 $0
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2006
Federal
$0 $12,000,000
State
$0 $3,000,000
Other
$0 $0
Phase Fund PE STP ROW Bond CST Bond
Year Underway
2006 2007
Federal
$0 $0
State
$2,000,000 $2,300,000
Other
$0 $0
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Federal $17,551,200
State $4,387,800
Other $0
Phase Fund
PE
Bond
PE
Bridge
ROW Bond
CST Bond
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Local
CST Bridge
CST STP
Phase Fund
PE
Bridge
CST Bridge
Year Underway Underway
2005 2006
Year Underway
2006 2007 2007
Year Underway
LOCL 2006 2006
Year Underway
2006
Federal
State
Other
$0 $0 Federal
$1,412,000 $5,600,000 $1,600,000
Federal
$0 $364,800 $160,000 Federal
$2,717.600
$500,000 $6,700,000
State
$0 $0
Other
$353,000 $1,400,000
$400,000
State
$0 $0 $0
Other
$0 $91,200 $40,000
State
$1,500,000 $0 $0
Other
$679,400
$0
Phase Fund
PE
Local
ROW Bond
CST Bond
Year LOCL Underway 2005
Phase Fund PE Local ROW STP CST STP
Year LOCL 2005 After 2007
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005
Federal $0
$0
State $0
$3,300,000
Other $0
$0
Federal $0
$176,000
State $0 $0
Other $120,000
$44,000
Federal $0 $0
$125,600
State $0 $0 $0
Other $15.700
$0 $31,400
Total
$12~,OOO
$2,540,000
Total $0
$15,000,000
Total $2,000,000 $2,300,000
Total $21,939,000
Total
$500,000 $6,700,000
Total $1,765,000 $7.000,000 $2.000,000
Total $1.500,000
$456,000 $200,000 Total $3,397,000
Total $0
$3.300.000
Total $120,000 $220,000
Total $15,700
$0 $157,000
Page 162 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I20Q5
FUlton
Project: 753300- Type Work: Sidewalks
Descp: HAMMOND DR FM GLENRIDGE DR TO DEKALB
COUNTY
Length: 0.86
TIP#: FN-AR-BP08
Project: 762520- Type Work: Bicycle/Ped. Facility
Descp: PARKWAY TRAIL PH I-VIRGINIA AVE TO MARTA
RAIL STATION
Length: 1.95
TIPII: FS-AR-BP-02
Project: 762522- Type Work: Bicycie/Ped. Facility Descp: PKWY TRAIL PH IV/CAMP TRUITT RD TO
BRANNON PK TO TUBMAN ELEM Length: 1.16
TlPII: FS-AR-BP-02
Project: 762525- Type Work: Bicycle/Ped. Facility
Descp: PHOENIX TRAIL FM COMMERCE GATEWAY TO
PHOENIX GATEWAY
Length: 0.00
TlPII: FS-AR-BP-03
Project: 762527- Type Work: Sidewalks Descp: DANFORTH RD FM CASCADE RD TO NEW HOPE
RD Length: 1.30
TlPII: FS-AR-BP03
Project: 762530- Type Work: Sidewalks
Descp: METROPOLITAN AVE FM NORTHSIDE DR TO CITY
LIMITS
Length: 0.82
TlP#: AT-159
Project: 762534- Type Work: Sidewalks Descp: SR 3721BIRMINGHAM HWY FM KENSINGTON
FARMS RD TO CRABAPPLE RD Length: 0.46
TIP#: FN-210
Project: 762562 Type Work: Bicycle/Ped. Facility Descp: WEST END RAIL MULTI-USE TRAIL FM SIMPSON
RD TO PRYOR ROAD Length: 0.00
TIP#: AT-AR-BP09
Project: 762590 Type Work: Intersection Improvement Descp: SR 54IUNIVERSITY AVE/MCDONOUGH AT
CAPITOURIDGE/GAMMON AVE Length: 0.14
LUMP SUM PROJECT
TlP#: AR-157
Project: 762601 Type Work: Sidewalks Descp: CITY OF ATLANTA SIDEWALKS @ 6 SCHOOLS/ PH
2 Length: 0.20
TlP#: AT-AR-BP28
Project: 770303- Type Work: Rail Projects Descp: COMMUTER RAIL PROGRAM MANAGEMENT - 2007
Length: 0.00 TlP#:
Phase Fund
PE
Local
CST CMAQ
Year LOCL 2006
Phase Fund ROW Local CST CMAQ
Year LOCL 2006
Phase Fund CST CMAQ
Year 2006
Phase Fund ROW Local CST CMAQ
Year LOCL 2005
Phase Fund ROW Local CST CMAQ
Year LOCL 2006
Phase Fund ROW Local CST CMAQ
Year LOCL 2005
Phase Fund
PE
STP
PE
HPP
ROW HPP
CST HPP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway Underway
2005 2006
Year Underway
LOCL 2005
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
Other
Year 2007
Federal $0
$500,000
State $0 $0
Federal $0
$274,400
State $0 $0
Federal $212,000
State $0
Federal $0
$957,600
State $0 $0
Federal $0
$420,000
State $0 $0
Federal $0
$721,600
State $0 $0
Federal
State
$120,000 $480,000 Federal
$0 $957,600
$30,000 $120,000 State
$0 $0
Federal
$437,400 $665,000
State
$48,600 $0
Federal $0 $0
$957,600
State $0 $0 $0
Federal $0
State $2,000,000
Other $63,000 $125,000
Other $34,000 $68,600
Other $53,000
Other $0
$239,400
Other $0
$105,000
Other $0
$180,400
Other
$0 $0 Other $50,000 $239,400
Other $0
$114,800
Other $120,000 $100,000 $239,400
Other $0
Total $63,000 $625,000
Total $34,000 $343,000
Total $265,000
Total $0
$1,197,000
Total $0
$525,000
Total $0
$902,000
Total
$150,000 $600,000 Total
$50,000 $1,197,000
Total $486,000 $779,800
Total $120,000 $100,000 $1,197,000
Total $2,000,000
Page 163 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM Za/ZQQ5
Fulton
Project: 770311. Type Work: Rail Projects
Descp: ATLANTA MULTIMODAL PASSENGER TERMINAL
PHASE 1; CT 2
Length: 0.00
TlP#: AR120A&B
Project: 770315. Type Work: Rail Projects
Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)
PHASE 1
Length: 0.00
TlP#: AR-269A
Project: 770316- Type Work: Rail Projects
Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)
PHASE 2
Length: 0.00
TlP#: AR-269B
Project: 770321. Type Work: Rail Projects
Descp: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON)
PHASE 2
Length: 0.00
TlP#: AR-268B
Project: 770900. Type Work: Replace Bridge Descp: CS 3101/GRIMES BRIDGE ROAD @ BIG CREEK IN
SOUTH ROSWELL Length: 0.37
TlP#: FN-095
Project: 770933. Type Work: Sidewalks Descp: HOLCOMB BR RD FM OLD HOLCOMBE BR RD TO
E OF SR 400(INCL BRS) Length: 0.59
TlP#: FNI77
Project: 771200. Type Work: Replace Bridge Descp: CR 188/UPPER HEMBREE ROAD @ FOE KILLER
CREEK 2 MI SW OF ALPH Length: 0.20
TlP#: FN-166
Project: 771228. Type Work: Bicycle/Ped. Facility Descp: MANSELL ROAD/CR 126 FROM BIG CREEK TO
MARTA PARKING LOT Length: 2.91
LUMP SUM PROJECT
TIP#: AR-384ABC
Project: 771252. Type Work: Bicycle/Ped. Facility Descp: ATLANTAWEST END RAIL-TRAIL
LUMP SUM PROJECT
Length: 0.00 TlP#: LUMP
Project: 771254. Type Work: Streetscapes Descp: METROPOLITAN PARKWAY STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TIP#: AR-384ABC
Project: 771270. Type Work: Replace Bridge Descp: CR 85/KIMBALL BRIDGE RD @ BIG CREEK 2 MI SE
OF ALPHARETTA Length: 0.20
TlP#: FN165A&B
Phase Fund CST HPP
Year 2005
Federal $3,333,262
State $833,316
Other $0
Phase Fund
PE STP
PE
HPP
CST HPP
Year Underway Underway
2005
Federal
State
$592,000
$148,000
Phase Fund CST HPP
Year 2005
Federal $40,000,000
State $10,000,000
Other
$0 Other
$0
Phase Fund CST NHS
Year 2005
Federal $7,728,000
State $1,932,000
Other $0
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2006
Phase Fund CST CMAQ
Year 2006
Federal
$0 $1,771,200
Federal $417,600
State
$0 $442,800
Other
$250,000 $0
State $0
Other $104,400
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2005
Phase Fund PE Local ROW Local CST STP
Year LOCL LOCL LUMP
Phase Fund PE Local ROW Local CST STP
Year LOCL LOCL LUMP
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Phase Fund PE Bridge ROW Local CST Bridge CST STP
Year Underway
LOCL 2006 2006
Federal
$0 $599,200
Federal $0 $0
$784,800
Federal $0 $0
$400,000
Federal $0 $0
$500,000
Federal
$0 $544,000 $288,000
State
Other
$0 $149,800
$1,500,000 $0
State $0 $0 $0
Other $0 $0
$196,200
State $0 $0 $0
Other $0 $0
$100,000
State $0 $0 $0
Other $0 $0
$125,000
State
$0 $136,000
$72,000
Other
$513,000 $0 $0
Total $4,166,578
Total
$740,000
Total $50,000,000
Total $9,660,000
Total $250,000 $2,214,000
Total $522,000
Total $1,500,000
$749,000
Total $0 $0
$981,000
Total $0 $0
$500,000
Total $0 $0
$625,000
Total $513,000 $680,000 $360,000
Page 164 of 300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 217/2005
Fulton
Project: 771273- Type Work: Replace Bridge
Descp: CR 629/JOHNSON ROAD @ PEEKS CREEK 1 MI E
OF PALMETTO
Length: 0.20
TIP#: FS-144
Project: 771275. Type Work: Replace Bridge
Descp: CR 13921COCHRAN MILL ROAD@ PEA CREEK 7
MI NW OF PALMETTO
Length: 0.21
TIP#: FS-140
Project: 771276.
Type Work: Replace Bridge
Descp: CR 13921COCHRAN MILL ROAD @ LITTLE PEA
CREEK NW OF PALMETTO Length: 0.10
TIP#: FS-143
Project: 771363.
Type Work: Miscellaneous Improvement
Descp: REGIONAL VANPOOL SUBSIDY PRGM:APPROX 50
COMMUTER VANPOOLS Length: 0.00
TIP#: AR-296A
Project: MOO1533 Type Work: Resurface & Maintenance
Descp: SR 401/SR 403 FR UNIVERSITY TO BROOKWOOD
1-285/1-75 RAMPS
Length: 13.77
TlP#: AR-IIIG
Project: MOO2385 Type Work: Bridge Painting Descp: PROPOSED BRIDGE PAINTING @ SEV
LOCATIONS IN DEKALB & FULTON Length: 0.00
LUMP SUM PROJECT
TIP#: Lump
Project: MOO2387 Type Work: Bridge Painting
Descp: 1-85& 1-285AT SEVERAL LOCATIONS- PROPOSED
BRIDGE PAINTING
Length: 0.00
LUMP SUM PROJECT
TlP#: Lump
Project: MOO2388 Type Work: Bridge Painting
Descp: 1-20AT SEVERAL LOCATIONS IN FULTON-PROPOSED BRIDGE PAINTING Length: 0.00
LUMP SUM PROJECT
TIP#: Lump
Project: MOO2434 Type Work: Concrete Rehab
Descp: 1-85FM COLLINSWORTH RD/COWETA TO SR
74/FULTON
Length: 4.91
LUMP SUM PROJECT
TIP#: Lump
Project: MOO2912 Type Work: Resurface & Maintenance
Descp: 1-20EB FM SWEETWATER CREEK TO HE HOLMES
RD & 1-285 RAMPS
Length: 8.63
LUMP SUM PROJECT
TlP#:
Project: MOO2970 Type Work: Guardrail Descp: 1-285 FROM WEST PACES FERRY ROAD TO
ASHFORD DUNWOODY ROAD Length: 9.78
TlP#: AR-IIIH
Phase PE ROW CST
Fund Bridge Local Bridge
Phase PE ROW CST
Fund Bridge Local Bridge
Phase PE ROW CST
Fund STP Local STP
Phase Fund
PE
CMAQ
Phase Fund PE NHS CST NHS
Phase Fund CST STP
Phase Fund CST 1M
Phase Fund CST 1M
Phase Fund CST 1M
Phase Fund CST 1M
Phase Fund
PE
NHS
CST NHS
Year Underway
LOCL Underway
Year Underway
LOCL 2006
Year Underway
LOCL 2005
Year 2007
Year 2007 2007
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year 2007 2007
Federal $0
Federal $0
$103,200 Federal
$0 $273,600 Federal $270,000
Federal $1,600,000 $20,800,000
Federal $162,560
Federal $335,610
Federal $850,320
Federal $12,960,000
Federal $11,700,000
Federal $1,600,000 $30,400,000
State $0
State $0
$25,800 State
$0 $68,400 State
$0
State $400,000 $5,200,000
State $40,640
State $37,290
State $94,480
State $1,440,000
State $1,300,000
State $400,000 $7,600,000
Other $500,000
Other $500,000
$0 Other $500,000
$0 Other
$0
Other $0 $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0 $0
Total $500,000
Total $500,000 $129,000 Total $500,000 $342,000 Total $270,000
Total $2,000,000 $26,000,000
Total $203,200
Total $372,900
Total $944,800
Total $14,400,000
Total $13,000,000
Total $2,000,000 $38,000,000
Page 165 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Fulton
Project: TOO0581 Type Work: Transit Projects
Descp: FY 2005 ACCESS TO JOBS ATLANTA SECTION
3037
Length: 0.00
TIP#:
Project: TOO0582 Type Work: Transit Projects Descp: MARTA FY 2005 SECTION 5307 CAPITAL
Length: 0.00 TIP#: AR-M-5307A
Project: TOO0587 Type Work: Transit Projects Descp: MARTA FY 2005 SECTION 5309 NEW RAIL STARTS
Length: 0.00 TlP#:
Project: TOOO588 Type Work: Transit Projects Descp: MARTA FY 2005 SECTION 5309 FIXED GUIDEWAY
Length: 0.00 TlP#:
Project: TOO0589 Type Work: Transit Projects
Descp: MARTA FY 2005 SECTION 5309 BUS RELATED
PROCUREMENT
Length: 0.00
TIP#:
Project: TOO0590 Type Work: Transit Projects Descp: GRTA FY 2005 SECTION 5309 CAPITAL FOR BUS
PURCHASE Length: 0.00
TlP#:
Project: TOO0597 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR FULTON
COUNTY Length: 0.00
TIP#: AR-FN-5310
Project: TOO0935 Type Work: Transit Projects Descp: MARTA FY 2006 SECTION 5307 CAPITAL
Length: 0.00
TlP#: AR-M-5307A
Project: TOO0936 Type Work: Transit Projects Descp: MARTA FY 2006 SECTION 5309 BUS RELATED
PROCUREMENT Length: 0.00
TlP#:
Project: TOO0937 Type Work: Transit Projects Descp: MARTA FY 2006 SECTION 5309 NEW RAIL STARTS
Length: 0.00 TIP#:
Project: TOO0938 Type Work: Transit Projects Descp: MARTA FY 2006 SECTION 5309 FIXED GUIDEWAY
Length: 0.00 TlP#:
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Federal $750,000
State $0
Other $750,000
Federal $36,865,124
State $0
Other $9,216,281
Federal $208,000
State $52,000
Other
Federal $22,200,000
State $0
Other $5,550,000
Federal $2,400,000
State $0
Other $600,000
Federal $27,200,000
State $6,800,000
Other $0
Federal $199,063
State $49,766
Other $0
Federal $36,838,095
State $0
Other $9,209,524
Federal $2,400,000
State $600,000
Other $0
Federal $1,600,000
State $400,000
Other
Federal $24,000,000
State $0
Other $6,000,000
Total
$1,500,000
Total
$46,081,405
Total Total
$27,750,000 Total $3,000,000 Total
$34,000,000
Total
$248,829
Total
$46,047,619 Total $3,000,000
Total Total
$30,000,000
Page 166 of300
STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM 217/2005
Fulton
Project: TOO0939 Type Work: Transit Projects
Descp: GRTA - FY 2006 SECTION 5309 CAPITAL BUS
PURCHASES
Length: 0.00
TIP#.
Project: TOO0941 Type Work: Transit Projects Descp: FY 2006 ACCESS TO JOBS ATLANTA SECTION
3037 Length: 0.00
TIP#:
Project: TOO0994 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR FULTON.
COUNTY
Length: 0.00
TlP#: AR-FN-5310
Project: T001115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rail - Phase II
Length: 0.00 TlP#:
Project: T001269 Type Work: Transit Projects
Descp: FY 2007 SECTION 5310 CAPITAL FOR FULTON
COUNTY
Length: 0.00
TIP#: AR-FN-5310
Project: T001312 Type Work: Transit Projects Descp: GRTA REGIONAL VAN POOL PROGRAM
Length: 0.00 TIP#:
Project: T001330 Type Work: Transit Projects Descp: MARTA FY 2007 SECTION 5307 CAPITAL
Length: 0.00 TIP#: AR-M-5307A
Project: T001364 Type Work: Rail Projects Descp: COMMUTER RAIL ATLANTA/LOVEJOY
(OPERATIONS ASSISTANCE) Length: 0.00
TlP#: AR-268F
Phase Fund CST Transit
Year 2006
Federal $27,200,000
State $6,800,000
Other $0
Phase Fund CST Transit
Year 2006
Federal $750,000
State $0
Other $0
Phase Fund CST Transit
Year 2006
Federal $209,016
State $52,254
Other $0
Phase Fund CST HPP
Year 2005
Federal $5,702,000
State $1,425,500
Other $0
Phase Fund CST Transit
Year 2007
Federal $219,467
State $54,867
Other $0
Phase Fund CST Transit CST Transit CST Transit
Phase Fund CST Transit
Year 2005 2006 2007
Year 2007
Federal $733,190 $822,938 $919,829
Federal $35,702,928
State $91,649 $102,867 $114,979
Other $91,649 $102,867 $114,979
State $0
Other $8,925,732
Phase Fund CST CMAQ
Year 2006
Federal $5,500,000
State $0
Other $1,375,000
Total $34,000,000
Total $750,000
Total $261,270
Total $7,127,500
Total $274,334
Total $916,487 $1,028,673 $1,149,786 Total $44,628,660
Total $6,875,000
Page 167 of 300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 21712005
Gilmer
Project: 0000847 Type Work: Replace Bridge Descp: CR 153/FH 34/ROCK CREEK ROAD @ ROCK
CREEK 9 MI NE OF ELLIJAY Length: 0.21
TlP#:
Project: 0006323 Type Work: Replace Bridge
Descp: CR 101/LOWER CARTECAY ROAD@ CARTECAY
RIVER
Length: 0.40
TlP#:
Project: 0006611 Type Work: Multi-use Trail
Descp: GILMER COUNTY RIVERFRONT PEDESTRIAN
WALKWAY
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006612 Type Work: Streetscapes
Descp: ELLIJAY STREETSCAPE FM SR 282 TO SPRING
STREET - PHASE III
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 831280- Type Work: New Construction
Descp: SR 382 EXT FM CR 239/0LD SR 5 TO NEW APD
CORRIDORISR 5
Lanes: Exist. 0 Prop. 2
Length: 1.52
TlP#:
Project: 831580- Type Wor1<: Replace Bridge Descp: SR 282 BRIDGE REPLACEMENT OVER TAILS
CREEK WEST OF ELLIJAY Length: 0.30
TlP#:
Phase Fund PE Forest Hw ROW Local CST Forest Hw
Year Underway
LOCL 2006
Phase Fund PE Bridge ROW Local CST Bridge
Year 2005 LOCL After 2007
Phase Fund CST STP
Year LUMP
Federal
$0 $1,156,000
Federal $24,000 $0
Federal $221,600
State $0 $0
State $6,000 $0
State $0
Phase Fund CST STP
Year LUMP
Federal $300,000
State $0
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Federal $32,000
Federal $2,248,800
State $8,000
State $562,200
Other $0 $0
Other $0
$50,000
Other $55,400
Other $75,000
Other $0
Other
$0
Total
$0
$1,156,000
Total
$30,000
$50,000
Total $277,000 Total $375,000
Total $40,000 Total
$2,811,000 Page 168 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM WI2005
Glascock
Project: 245345- Type Work: Replace Bridge Descp: SR 102@JOES CREEK 2.2 MI SE OF MITCHELL
Length: 0.58 TlP#:
Project: 245346- Type Work: Replace Bridge Descp: SR 171 @ ROCKY COMFORT CREEK &
OVERFLOW@ GIBSON N CITY LIMIT Length: 0.73 TIP#:
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 2006
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2006
Federal
$64,000 $1,164,000
Federal
$16,000 $2,066,400
State $16,000 $291,000
State
$4,000 $516,600
Other
$0 $0
Other
$0 $0
Total $80,000 $1,455,000
Total $20,000 $2,583,000
Page 169 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zmZQQ5
Glynn
Project: 0000422 Type Work: Widening
Descp: SR 99/GRANTS FERRY ROAD FROM EAST OF 1-95
TO SR 25/US 17 Lanes: Exist. 2 Prop. 4
Length: 1.03
TlP#: BATSOO-15
Project: 0001223 Type Work: Replace Bridge
Descp: CR 78 @ BURNETT CREEK 3 MI NW OF
BRUNSWICK
Length: 0.20
TlP#: BATSOI-06
Project: 0001490 Type Work: Bicycle/Ped. Facility
Descp: DNR REC TRAILS PROG - ALTAMAHA PARK
RECREATIONAL TRAIL
Lenglh: 0.00
LUMP SUM PROJECT
TIP#: BATS-Q94
Project: 0001585 Type Work: Interchange Descp: 1-95 INTERCHANGE RECONSTRUCTION AT SR
99/GRANTS FERRY ROAD Length: 1.00
TlP#: BATS02-01
Project: 0002167 Type Work: Railroad Crossing
Descp: CR 581/0LD JESUP RD IN BRUNSWICK @ NS /I
729221V
Length: 0.40
LUMP SUM PROJECT
TlP#: BATS-Q27A
Project: 0002168 Type Work: Railroad Crossing
Descp: CR 721GREEN SWAMP RD IN BRUNSWICK @ NS /I
729224R
Length: 0.40
LUMP SUM PROJECT
TlP#: BATS-Q27B
Project: 0003803 Type Work: Miscellaneous Improvement Descp: PE FOR SECURITY SYSTEMS ON TALMADGE &
SIDNEY LANIER BRIDGES Length: 35.45
LUMP SUM PROJECT
TlP#: BATS-MSL
Project: 0005071 Type Work: Widening Descp: 1-95 FM NORTH OF SR 303 TO CR 586
Lanes: Exist. 4 Prop. 6
Length: 4.93 TlP#: BATS93-09
Project: 0005088 Type Work: Bridge Rehab Descp: 195 AT TURTLE RIVER AND GIBSON CREEK
Lanes: Exist. 4 Prop. 8
Length: 0.80 TlP#: BATS93-09
Project: 0006018 Type Work: Lighting Descp: SIDNEY LANIER BRIDGE AESTHETIC LIGHTING
Length: 0.00 TlP#: BATS03-05
Project: 0006312 Type Work: Tollway Facility Descp: TORRAS CAUSEWAY TOLL PLAZA REMOVAL
Length: 0.20 TlP#:
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2006
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2006
Phase Fund CST Rec Trails
Year LUMP
Phase Fund ROW NHS CST NHS
Year 2006 2007
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
NHS
Year LUMP
Phase Fund PE NHS CST Bond
Year 2005 2006
Phase Fund CST Bond
Year 2006
Phase Fund CST State
Year 2005
Phase Fund CST Other
Year 2005
Federal
$0 $1,856,000
Federal
$0 $417,600
Federal $100,000
State $0
$464,000
State $0
$104,400
State $0
Federal $3,600,000 $5,428,800
State $900,000 $1,357,200
Federal $100,000
State $0
Federal $100,000
State $0
Federal $48,000
State $12,000
Federal $400,000
$0
State $100,000 $26:000,000
Federal $0
State $29,000,000
Federal $0
State $400,000
Federal $0
State $105,000
Other $0 $0
Other $10,000
$0 Other $25,000
Other $0 $0
Other $0
Other $0
Other $0
Other $0 $0
Other $0
Other $0
Other $0
Total
$0
$2,320,000
Total $10,000 $522,000 Total
$125,000
Total $4,500,000
$6,786,000
Total
$100,000 Total
$100,000
Total
$60,000
Total
$500,000
$26,000,000
Total
$29,000,000 Total
$400,000 Total
$105,000 Page 170of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Glynn
Project: 0006536 Type Work: Historic Facilities Descp: ST. SIMON'S LIGHTHOUSE REHABILITATION
LUMP SUM PROJECT
Length: 0.00 TlP#: TE6536
Project: 0006537 Type Work: Multi-use Trail Descp: JEKYLL ISLAND MULTI-USE TRAIL PHASE II
LUMP SUM PROJECT
Length: 0.00 TIP#: TE-6537
Project: 0006655 Type Work: Lighting
Descp: SR 25IUS 17@ JEKYLL ISLAND CAUSEWAY-
LIGHTING
Length: 0.40
LUMP SUM PROJECT
TIP#:
Project: 511090. Type Work: Widening
Descp: 1-95FM US 17/SR 520 SOUTH OF BRUNSWICK TO
NORTH OF SR 303 Lanes: Exist. 4 Prop. 6
Length: 4.31
TlP#: BATS93-09
Project: 511092. Type Work: Bridge Rehab
Descp: 1-95AT SOUTH BRUNSWICK RIVER AND HILLERY
SLOUGH Lanes: Exist. 4
Prop. 6
Length: 0.59
TlP#: BATS93-09
Project: 511100. Type Work: Widening
Descp: 1-95FM N OF CSX RR TO N OF S ALTAMAHA
RIVER;EXC SR 99 INT Lanes: Exist. 4 Prop. 6
Length: 7.82
TlP#: BATS9310
Project: 522890- Type Work: Intersection Improvement
Descp: ALTAMA AVE\CR 590 AT ALTAMA CONN & SR 303
&SR 25 SPUR
Length: 0.30
TlP#: BATS 04-0J
Project: 523190 Type Work: Bridges
Descp: SR 520/SR 25 FLYOVER BRIDGE AT COLONEL'S
ISLAND @ RR(PORTS}
Length: 0.53
TIP#: BATSOO-OJ
Project: TOO0651 Type Work: Transit Projects
Descp: FY 2005 SECTION 5307 OPERATING FOR
BRUNSWICK
Length: 0.00
TlP#: BATS
Project: TOO0652 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR BRUNSWICK
Length: 0.00 TIP#: BATS
Project: TOO0653 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR BRUNSWICK
Length: 0.00 TIP#: BATS
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST NHS
Year LUMP
Phase Fund
PE
NHS
CST Bond
Year Underway
2005
Phase Fund CST Bond
Year 2005
Phase PE ROW CST
Fund NHS NHS Bond
Year Underway
2006 2007
Phase PE ROW CST
Fund STP Local STP
Year 2005 LOCL After 2007
Phase Fund
PE
NHS
ROW Local
CST H060
CST STP
Phase Fund CST Transit
Year Underway
LOCL 2005 2005
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Federal $100,000
State $0
Federal $507,200
State $0
Federal $19,200
State $4,800
Federal
State
$0 $14,000,000
Federal $0
State $24,000,000
Federal
State
$7,200 $0
$1,800 $18,316,476
Federal $8,000 $0
State $2,000 $0
Federal
$0 $2,485,250 $4,453,600
Federal $0
State
$0 $0 $1,113,400
State $0
Federal $0
State $0
Federal $25,169
State $6,292
Other $25,000
Other $126,800
Other $19,000
Other $0
Other $0
Other $0 $0
Other $0 $0
Other $0 $0 $0
Other $0
Other $0
Other $0
Total $125,000
Total $634,000
Total $43,000
Total $14,000,000
Total $24,000,000
Total $9,000
$18,316,476 Total $10,000 $0
Total $0
$2,485,250 $5,567,000
Total $0
Total $0
Total $31,461
Page 171 of 300
STA T TRANSPORTA TlON IMPROVEMENT PROGRAM
2aJ2QQ5
Glynn
Project: T000916 Type Work: Transit Projects
Descp: FY 2006 SECTION 5307 OPERATING FOR
BRUNSWICK
Length: 0.00
TIP#: BATS
Project: T000917 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR BRUNSWICK
Length: 000 TIP#: BATS
Project: T000918 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR BRUNSWICK
Length: 0.00
TlP#: BATS
Project: T001232 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 OPERATING FOR
BRUNSWICK Length: 0.00
TlP#:
Project: T001233 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR BRUNSWICK
Length: 0.00 TlP#:
Project: T001234 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR BRUNSWICK
Length: 0.00 TIP#:
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Year 2006
Year 2006
Year 2006
Year 2007
Year 2007
Year 2007
Federal $218,798
State $0
Federal $221,499
State $27,687
Federal $26,427
State $6,607
Federal $218,798
State $0
Federal $221,499
State $27,687
Federal $27,749
State $6,937
Other $295,154
Other $27,687
Other $0
Other $295,154
Other $27,687
Other $0
Total
$513,952
Total
$276,874 Total $33.034
Total
$513,952
Total
$276,874
Total
$34.686
Page 172 of 300
'.
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2t7/2005
Gordon
Project: 0000308 Type Work: Intersection Improvement Descp: SR 156 @ COLLEGE STREET IN CALHOUN
Length: 0.25 TlP#:
Project: 0000683 Type Work: Replace Bridge
Descp: CR 134/COUNTY LINE ROAD@ POLECAT CREEK
@ MURRAY CO. LINE Lanes: Exist. 0 Prop. 1
Length: 0.20
TIP#:
Project: 0001578 Type Work: Turn Lanes Descp: SR 53 MEDIAN TURN LANES FM NORTH OF
FLOYD CO TO SR 53 SPUR Length: 3.83
TlP#:
Project: 0001727 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNAL EQUIP @ VARIOUS
LOC IN GORDON CO
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0003721 Type Work: Railroad Crossing
Descp: CR 93/S0UTH HOLCOMB RD IN ADAIRSVILLE@
CSX #340496X
Length: 0.20
LUMP SUM PROJECT
TlP#:
Project: 0004048 Type Work: Intersection Improvement
Descp: SR 53 AT MCDANIEL STATION ROADICR 5 0.5 MI
WEST OF CALHOUN
Length: 0.52
LUMP SUM PROJECT
TlP#:
Project: 0008416 Type Work: Roadway Project
Descp: SR 53 FM CR 271/CARTER MOUNTAIN RD TO CR
178IDAVIS RD
Length: 2.40
LUMP SUM PROJECT
TlP#:
Project: 810750. Type Work: Interchange
Descp: 1-75 @ SR 156 IN CALHOUN AND WIDENING OF SR
1561 REDBUD RD
Lanes: Exist. 3 Prop. 5
Length: 0.50
TlP#:
Project: 610870 Type Work: Interchange Descp: 1-75 @ UNION GROVE RD/CR 65 RELOC IN
CALHOUN Length: 1.00
TlP#:
Project: 610930. Type Work: Interchange Descp: 1-75 INTERCHANGE @ SR 136 & WIDENING ON SR
136 Length: 1.00
TIP#:
Project: 620780. Type Work: Widening
Descp: SR 3/US 41 FM S OF SR 156 N TO CALHOUN BYP
IN CALHOUN
Lanes: Exist. 2 Prop. 4
Length: 1.65
TIP#:
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL 2006
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2005
Phase Fund
PE
STP
CST STP
Year Underway
2006
Federal $0
$288,000
Federal $0
$306,400
Federal $3,193,600
State $0
$72,000
State $0
$76,600
State $798,400
Phase Fund CST STP
Year LUMP
Federal $600,000
State $150,000
Phase Fund CST STP
Year LUMP
Federal $120,000
State $0
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL LUMP
Federal
$0 $652,500
State
$0 $72,500
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Federal
$315,000 $2,430,000
State
$35,000 $270,000
Phase Fund
PE
1M
ROW 1M
ROW 1M
CST 1M
Phase PE ROW CST
Fund NHS STP STP
Year Underway
2005 After 2007 After 2007
Year Underway
2006 After 2007
Federal $11,743,200
Federal $2,054,400
State
$1,304,800
State
$513,600
Phase PE ROW CST CST
Fund STP STP 1M STP
Phase PE ROW CST
Fund STP STP STP
Year Underway
2006 After 2007 After 2007
Year Underway
2007 After 2007
Federal $602,400
State
$150,600
Federal $4,410,400
State
$1,102,600
Other $0 $0
Other $10,000
$0
Other $0
Total $0
$360,000
Total $10,000
$383,000
Total $3,992,000
Other $0
Total $750,000
Other $0
Total $120,000
Other
$74,000 $0
Total
$74,000 $725,000
Other
$0 $0
Total
$350,000 $2,700,000
Other $0
Total $13,048,000
Other $0
Total $2,568,000
Other $0
Total $753,000
Other $0
Total $5,513,000
Page 173 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM za12QQ5
Gordon
Project: 621365- Type Work: Widening
Descp: SR 3/US 41/CALHOUN FM CR 65/UNION GROVE
RD TO SR 53/1NCL BR Lanes: Exist. 2 Prop. 4
Length: 2.84
TlP#:
Project: 632906- Type Work: Replace Bridge
Descp: SR 225@ COOSAWATTEE RIVER 4 MI NE OF
CALHOUN
Length: 0.32
TIP#:
Project: 642391- Type Work: Replace Bridge
Descp: SR 156 @ OOTHKALOOGA CREEK 1 MI WEST OF
CALHOUN
Length: 0,46
TIP#:
Project: 642395- Type Work: Replace Bridge
Descp: SR 156@ JOHNS CREEK ON FLOYDGORDON CO
LINE
Length: 0.36
TIP#:
Project: MOO2386 Type Work: Bridge Painting
Descp: PROPOSED BRIDGE PAINTING AT SEV LOCS IN BARTOWIDADEIGORDON Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: MOO2540 Type Work: Resurface & Maintenance DeSCP: SR 136 CONN FROM SR 136 TO OOSTANAULA
RIVER BRIDGE Length: 8.87
LUMP SUM PROJECT
TlP#:
Project: M002542 Type Work: Resurface & Maintenance
Descp: SR 136 FROM SR l/WALKER TO SR 136
CONN/GORDON
Length: 19.99
LUMP SUM PROJECT
TIP#:
Project: MOO2789 Type Work: Bridges
Descp: 1-75@ 5 LOCATIONS IN BARTOW & GORDON. DECK REHAB Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2007 After 2007
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2006 After 2007
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway
2005
Phase Fund CST 1M
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund PE 1M CST 1M
Year LUMP LUMP
Federal $800.000
Federal $13,000
Federal $8,000
Federal $1,556,800
Federal $286,560
Federal $499,200
Federal $1,040,000
Federal $180,000 $1,800,000
State $200.000
State $3.250
State $2,000
State $389.200 State
$31,840
State $124,800
State $260,000
State $20.000 $200,000
Other $0
Other $0
Other $0
Other
$0 Other
$0
Other $0
Other $0
Other $0 $0
Total
$1.000.000
Total $16.250 Total $10,000
Total
$1.946.000
Total
$318,400 Total
$624,000
Total
$1,300.000
Total $200,000
$2,000.000
Page 174 of 300
STA TE TRANSPORTA nON IMPROVEMENT PROGRAM 2al2QQ5
Grady
PrOject: 0000535 Type Work: Intersection Improvement Descp: SR 38/US 84@ SR 112 AND 17TH AVENUE
Length: 0.62 TlP#:
Project: 0001035 Type Work: Passing Lanes
Descp: SR 93 FM CAIRO/GRADY CO TO
PELHAM/MITCHELL CO AT 3 LOCATIONS
Lanes: Exist. 2 Prop. 3
Length: 9.05
TIP#:
Project: 0003842 Type Work: Replace Bridge
Descp: CR 85 @ UTILE TIRED CREEK APP .4 MI SE OF
CAIRO
Length: 0.34
TIP#:
Project: 0005293 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS AT VAR LOC ALONG
SR 38IUS 84 & SR 93
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 431800. Type Work: Replace Bridge
Descp: SR 1121PELHAM ROAD @ SAPP CREEK APP 5 MI
NOFCAIRO
Length: 0.40
TlP#:
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year 2006 After 2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year 2007 After 2007 After 2007
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2006
Phase Fund ROW Local CST STP
Year LOCL LUMP
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2007
Federal $32,000
State $8,000
Federal $160,000
State $40,000
Federal
$0 $824.000
Federal $0
$398,400
State
$0 $206,000
State $0
$99,600
Federal
State
$623,305
$155,826
Other $0
Other $0
Other $10,000
$0 Other
$0 $0
Other
$0
Total $40,000
Total $200,000
Total $10,000 $1,030.000 Total
$0 $498,000
Total
$779,131
Page 175 of 300
STA TE TRANSPORTA TION IMPROVEMENT PROGRAM 21712005
Greene
Project: 0004292 Type Work: Intersection Improvement
Descp: SR 12@ CR 110/CUNNINGHAM RD INTERSECTION
IMPROVEMENTS
Length: 0.61
TIP#:
Project: 0006252 Type Work: Widening
Descp: SR 44 FM WEST US 441 BYPASS TO CR
54/L1NGER LONGER RD
Lanes: Exist. 2 Prop. 4
Length: 15.00
TIP#:
Project: 0006253 Type Work: Widening
Descp: SR 44 FM CR 54/L1NGER LONGER ROAD TO EAST
GREENSBORO BYPASS
Lanes: Exist. 2 Prop. 4
Length: 7.94
TlP#:
Project: 0006605 Type Work: Streetscapes Descp: GREENSBORO STREETSCAPE PLAN - PHASE III
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 0006944 Type Work: Realignment
Descp: SR 44 @ CR 39/0LD EATONTON RD N OF 1-20-
INTERSECTION RELOC
Length: 0.15
TlP#:
Project: M002468 Type Work: Shoulder Work Descp: 1-20RAMPS AT SR 77 AND SR 22
LUMP SUM PROJECT
Length: 0.80 TlP#:
Phase Fund
PE
STP
ROW STP
CST STP
Year 2007 After 2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year 2007 After 2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year 2007 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Phase PE ROW CST
Fund STP STP STP
Year 2005 2007 After 2007
Phase Fund CST 1M
Year LUMP
Federal $103.200
Federal $3.692.000
Federal $1,950,400
Federal $600.000
Federal $20,000 $20.000
Federal $1.078.200
State $25,800
State $923.000
State $487,600
State $0
State $5,000 $5,000
State $119.800
Other $0
Other $0
Other $0
Other $150,000
Other $0 $0
Other $0
Total
$129,000
Total
$4.615.000
Total
$2,438,000
Total
$750,000
Total
$25.000
$25,000
Total
$1,198.000
Page 176 of300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005
GWinnett
Project: 0000106 Type Work: Bicycle/Ped. Facility Descp: ROGERS BRIDGE TRAIL IN FULTON & GWINNETT
LUMP SUM PROJECT
Lenglh: 0.00 TlP#: AR-384ABC
Project: 0000109 Type Work: Bicycle/Ped. Facility
Descp: ROGERS BR TRAIUMULTI-USE FAC/ROGERS BR
RD & LANDSCAPING
Length: 0.50
LUMP SUM PROJECT
TIP#: AR-384ABC
Project: 0000300 Type Work: Replace Bridge
Descp: SR 8/US 29 @ ALCOVY RIVER 3 MI NE OF
LAWRENCEVILLE
Length: 0.22
TIP#: GW-295
Project: 0000844 Type Work: Intersection Improvement Descp: SR 8/US 29 AT PLEASANT HILULESTER ROADS
Length: 0.21 TlP#: GW-296
Project: 0000845 Type Work: Intersection Improvement Descp: SR 8IUS 29 AT BEAVER RUIN ROAD/SR 378
Lanes: Exist. 0 Prop. 2
Length: 1.10 TIP#: GW-297
Project: 0002104 Type Work: ATMS/ITS
Descp: SR 124/SCENIC HWY ATMS FM US 78/SR 10 TO US
29/SR 8
Length: 7.30
TIP#: GW-323
Project: 0002328 Type Work: Miscellaneous Improvement Descp: DULUTH TOWN CENTER SCENIC
BEAUTIFICATION Length: 0.00
LUMP SUM PROJECT
TIP#: AR-384ABC
Project: 0002859 Type Work: Bicycle/Ped. Facility
Descp: DULUTH TOWN GREEN PATHWAYS (LCI PROJECT) Length: 0.00
LUMP SUM PROJECT
TlP#: GW-AR-239
Project: 0002860 Type Work: Bicycle/Ped. Facility Descp: SR 120 REALIGNMENT IN DULUTH (LCI PROJECT)
LUMP SUM PROJECT
Length: 0.00 TIP#: GW-AR-241
Project: 0003184 Type Work: HOV Lanes
Descp: 1-85FROM SR 316 NORTH TO HAMIL TON MILL RD
FOR HOV LANES
Lanes: Exist. 8 Prop. 10
Length: 13.99
TlP#: AR-H-IOO
Project: 0003168 Type Work: HOV Lanes Descp: SR 316 FROM 1-85TO SR 20 FOR HOV LANES
Lanes: Exist. 4 Prop. 6
Length: 5.13 TIP#: AR-H-500
Phase Fund
PE
STP
ROW Local
CST STP
Phase Fund
PE
Local
ROW Local
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund PE STP ROW STP CST STP
Phase Fund PE STP ROW STP CST STP
Phase Fund
PE
Local
CST STP
Phase Fund CST STP
Phase Fund PE Local ROW Local CST STP
Phase Fund PE STP ROW Local CST STP
Phase Fund PE Bond ROW Bond CST Bond
Phase Fund PE NHS ROW NHS CST Bond
Year Underway
LOCL LUMP
Year LOCL LOCL LUMP
Year Underway
2006 2007
Year Underway
2005 2007
Year Underway
2005 2007
Year LOCL 2006
Year LUMP
Year LOCL LOCL LUMP
Year Underway
LOCL LUMP
Year Underway
2007 After 2007
Year Underway
2006 After 2007
Federal
$0 $160,000
State
$0 $0
Federal $0 $0
$326,400
State $0 $0 $0
Federal
$160,000 $920,000
State
$40,000 $230,000
Federal
$1.771,200 $4,409,600
State
$442.800 $1,102,400
Federal
$809,600 $2.642,400
State
$202,400 $660.600
Federal $0
$1.717,152
State $0 $0
Federal $750,000
State $0
Federal $0 $0
$728,000
State $0 $0 $0
Federal
$0 $1,260,000
State
$0 $0
Federal $0
State $3.000.000
Federal $2,400.000
State $600,000
Other $0
$40,000
Other $0 $0
$81,600
Other $0 $0
Other $0 $0
Other $0 $0
Other $125,000 $429,288
Other $187,500
Other $0 $0
$182,000
Other $0
$315,000
Other $0
Other $0
Total $0
$200,000
Total $0 $0
$408,000
Total $200,000 $1,150,000
Total $2,214.000 $5,512,000
Total $1,012.000 $3,303,000
Total $125,000 $2,146,440
Total $937,500
Total $0 $0
$910,000
Total $0
$1.575,000
Total $3.000,000
Total $3,000.000
Page 177 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM WaDD5
Gwinnett
Project: 0003773 Type Work: Barriers
Descp: US 78/STONE MOUNTAIN FREEWY FM SCOTT
BLVD TO EAST PARK PLACE Length: 9.58
LUMP SUM PROJECT
TIP#:
Project: 0004430 Type Work: Widening
Descp: SR 20/CUMMING HWY FM PEACHTREE IND BLVD
TO BURGESS ROAD Lanes: Exist. 2 Prop. 4
Length: 4.60
TIP#: GW-020Al
Project: 0004456 Type Work: New Construction
Descp: MCGINNIS FERRY RD EXT FM L'VILLE-SUWANEE
TO SATELLITE BLVD Lanes: Exist. 0 Prop. 4
Length: 2.67
TlP#: GW-119
Project: 0004457 Type Work: Sidewalks Descp: LILBURN CONNECTING SIDEWALKS FM CHURCH
STREET TO BURNS ROAD Length: 0.00
TlP#: GW-AR-BPI
Project: 0004486 Type Work: New Construction
Descp: MCCLURE BRIDGE/DAVENPORT ROAD EXTENSION (SOUTH) LCI PROJECT Length: 0.00
LUMP SUM PROJECT
TlP#: GW-AR-240
Project: 0004594 Type Work: Water Pollution Mitig. Descp: 3852.5 STREAM CREDITS FOR PI
110530-/NHIM-85-2(146) Length: 0.00
LUMP SUM PROJECT
TlP#: AR-311
Project: 0004644 Type Work: Widening
Descp: SR 20/LOGANVILLE HIGHWAY FM OZORA RD TO
SR81
Lanes: Exist. 2 Prop. 4
Length: 3.64
TIP#: GW-020FI&
Project: 0004869 Type Work: HOV Lanes
Descp: SR 316 FROM SR 20 TO DROWNING CREEK ROAD
FOR HOV LANES Lanes: Exist. 4 Prop. 6
Length: 8.04
TlP#: AR-H-501
Project: 0005688 Type Work: ATMSIITS Descp: SR 378 BEAVER RUIN RD ATMS/ITS FROM
SR13/US 23 TO SR8/US 29 Length: 6.45
TlP#: GW-324
Project: 0005689 Type Work: ATMSIITS Descp: LAWRENCEVILLE SWANEE RD ATMS FM
PCHTREE IND BLVD TO SR 120 Length: 8.01
TlP#: GW-325
Project: 0005825 Type Work: ATMSIITS Descp: OLD NORCROSS RD ATMS & SUR FROM
SATELLITE BLVD TO SR 120 Length: 7.00
TlP#: GW-322
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $1,350,000
State $150,000
Other $0
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year Underway
2006 After 2007
Federal $0
State $5,000,000
Other $0
Phase Fund
PE
Local
ROW Local
CST STP
Phase Fund
PE
Local
CST CMAQ
Year LOCL LOCL 2006
Year LOCL 2005
Federal $0 $0
$14,400.000
State $0 $0
$3.600.000
Other $1,800,000 $5,000,000
$0
Federal $0
$400,000
State $0 $0
Other $0
$100,000
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund ROW STP
Year LUMP
Federal
$44,900 $264,000
Federal $124,000
State
$0 $0
State $31.000
Other
$8,823 $70,579
Other $0
Phase Fund
PE
Bond
ROW STP
ROW Bond
CST STP
CST Bond
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year Underway
2005 2005 2006 2006 Year 2007 After 2007 After 2007
Federal
$212,000 $0
$560,000 $0
Federal $7.348,000
State
$53.000 $1.750,000
$140,000 $4,550,000
State $1,837.000
Other
$0 $0 $0 $0 Other $0
Phase Fund
PE
Local
CST STP
Year LOCL 2007
Federal $0
$1,136,800
State $0 $0
Other $105,000 $284,200
Phase Fund
PE
Local
CST STP
Year LOCL 2006
Federal $0
$1,328,400
State $0 $0
Other $105,000 $332.100
Phase Fund CST STP
Year 2007
Federal $1,112,992
State $0
Other $278,248
Total
$1.500,000
Total
$5,000,000
Total
$1,800,000
$5,000.000
$18,000,000
Total
$0
$500,000
Total
$53.723
$334,579
Total
$155,000
Total
$265,000 $1,750,000
$700.000
$4.550,000 Total
$9,185,000
Total $105,000 $1,421,000 Total
$105.000
$1,660,500
Total
$1,391,240 Page 178of300
.'
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 20/2005
GWinnett
Project: 0006276 Type Work: New Construction
Descp: MCCLURE BRIDGE/DAVENPORT ROAD
EXTENSION (NORTH) LCI PROJECT
Lanes: Exist. 0 Prop. 2
Length: 0.20
LUMP SUM PROJECT
TlP#: GW-AR-242
Project: 0006277 Type Work: Sidewalks
Descp: PEDESTRIAN IMPROVEMENTS ALONG MAIN ST
TO BUFORD HWY - LCI
Length: 0.00
LUMP SUM PROJECT
TlP#: GW-AR-243
Project: 0006306 Type Work: Widening
Descp: SR 316 FROM SR 20 EAST TO BARROW CO L1NE-
ADVANCE RW ONLY Lanes: Exist. 4 Prop. 6
Length: 9.20
TlP#: GW-AR-249
Project: 0006336 Type Work: ATMS/ITS
Descp: ATMS/I-985 COMMUNIC/SURVEILANCE FM 1-85 TO
FLOWERY BRANCH
Length: 11.65
TlP#: AR-436
Project: 0006397 Type Work: ATMS/ITS Descp: ATMS/I-85 N RAMP METERS-HAR FM BUFORD
HWY TO PLEASANT HILL Length: 16.43
TIP#: AR-439
Project: 0006587 Type Work: Streetscapes Descp: NORCROSS DOWNTOWN STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 0006588 Type Work: Multi-use Trail Descp: IVY CREEK GREENWAY - PHASE I
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006813 Type Work: Streetscapes Descp: CITY OF DACULA STREETSCAPE PROJECT
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 0008845 Type Work: Multi-use Trail Descp: CAMP CREEK GREENWAY & TRAIL
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0008698 Type Work: Sidewalks Descp: JIMMY CARTER BLVD - PEDESTRIAN SAFETY
Length: 0.00 TIP#:
Project: 0006823 Type Work: ATMS/ITS
Descp: PLEASANT HILL RD FM STEVE REYNOLDS BLVD
TO FULTON CO LINE
Length: 4.04
TlP#: GW-326
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $48,000
$264,000
Federal $840,000
State $0 $0
State $0
Phase Fund ROW NHS
Year 2005
Federal $4,800,000
State $1,200,000
Phase Fund
PE
NHS
CST Bond
Year 2006 2007
Phase Fund
PE
NHS
CST Bond
Year 2005 2006
Phase Fund CST STP
Year LUMP
Federal $120,000
$0
State $30,000 $13,000,000
Federal $40,000 $0
State $10,000 $3,000,000
Federal $800,000
State $0
Phase Fund CST STP
Year LUMP
Federal $1,000,000
State $0
Phase Fund CST STP
Year LUMP
Federal $249,600
State $0
Phase Fund CST STP
Year LUMP
Federal $600,000
State $0
Phase Fund CST H170
Year 2005
Federal $400.000
State $0
Phase Fund
PE
Local
CST STP
Year LOCL 2007
Federal $0
$952,000
State $0 $0
Other $12,000 $66,000 Other $210,000
Other $0
Other $0 $0
Other $0 $0
Other $200,000
Other $250,000
Other $62,400
Other $150,000
Other $0
Other $63,000 $238,000
Total $60,000
$330,000 Total $1,050,000
Total $6,000,000
Total $150,000 $13,000,000
Total $50,000 $3,000,000
Total $1,000,000
Total $1,250,000
Total $312,000
Total $750,000
Total $400,000
Total $63,000 $1,190,000
Page 179 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zaL2005
Gwinnett
Project: 0006831 Type Work: ATMSIITS
Descp: GWINNETT COUNTY TRAFFIC SIGNAL UPGRADES
- SECTION ONE
Length: 0.00
TlPI/. GW-306A
Project: 0006832 Type Work: ATMS/ITS
Descp: GWINNETT COUNTY TRAFFIC SIGNAL UPGRADES
- SECTION TWO
Length: 0.00
TIP#: GW-306B
Project: 0006836 Type Work: Multi-use Trail Descp: PEACHTREE INDUSTRIAL BLVD MULTI-USE PATH
Length: 0.00 TlP#: GW-AR-BPI
Project: 0006838 Type Work: Bicycle/Ped. Facility Descp: DULUTH RESIDENTIAL
LOOP@IRVINDALEIHOWELL MEADIHOWELL Length: 0.00
TlP#: GW-AR-BPI
Project: 0006839 Type Work: BicyclelPed. Facility Descp: SR 1201WLAWRENCEVILLE FM BUFORD HWY TO
DULUTH ELEM & MIDDLE Length: 0.22
TlP#: GW-AR-BPI
Project: 110610- Type Work: Widening
Descp: 1-85FM HAMIL TON RD TO N/SR 211/FARM
MARKET RD IN BARROW
Lanes: Exist. 4 Prop. 6
Length: 6.30
TlP#: GW-AR-192
Project: 110720- Type Work: ATMS/ITS
Descp: ATMS/I-85 N COMMUNIC/SURVEILANCE FROM SR
316 TO SR 20
Lenglh: 9.22
TlP#: AR-470
Project: 121710- Type Work: Widening
Descp: SR 201L0GANVILLE HWY FM PLANTATION BLVD
TO OZORA RD
Lanes: Exist. 2 Prop. 4
Length: 3.90
TlP#: GW-020E
Project: 122925- Type Work: ATMS/ITS Descp: ATMS/SR 316 COMM/SURVEILLANCE FM 1-85TO
SR 124/SR 20 Length: 7.14
TlP#: AR-434
Project: 132890- Type Work: Bridges Descp: CR 1880/PLEASANT HILL RD @ BUFORD HWY &
NS RR/GRD SEP PHl Length: 0.60
TlP#: GW-279A&B
Project: 132985- Type Work: Replace Bridge
Descp: SR 20/CUMMING HWY@ CHATTAHOOCHEE
RIVER @ FORSYTH CO LINE
Lanes: Exist. 2 Prop. 4
Length: 0.40
TIP#: GW-020A2
Phase Fund CST CMAQ
Year 2006
Federal $273,600
State $0
Phase Fund CST CMAQ
Year 2007
Federal $252,000
State $0
Phase Fund
PE
Local
CST STP
Year LOCL 2007
Federal $0
$1,540,000
State $0 $0
Phase Fund CST CMAQ
Year 2007
Federal $1.184.000
State $0
Phase Fund CST CMAQ
Year 2007
Federal $496,000
State $0
Phase Fund PE NHS ROW NHS CST Bond
Year Underway
2006 After 2007
Federal $4.116.000
State $1.029.000
Phase Fund
PE
NHS
CST NHS
Year 2005 2006
Federal $120.000 $12.372,000
State $30.000 $3.093.000
Phase Fund PE STP ROW Bond ROW State CST Bond
Phase Fund PE NHS CST NHS
Year Underway Underway Underway
2006
Year 2006 2007
Federal
State
$0
Federal $120,000 $9.120.000
$7.900.000
State $30.000 $2.280.000
Phase Fund PE STP ROW STP CST STP CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Year Underway Underway
2005 2005
Year Underway
2006 After 2007 After 2007
Federal
State
$8,000,000 $8.000.000
Federal
$412,000
$2,000.000 $2.000.000
State
$103.000
Other $68,400
Other $63.000
Other $192.500 $385,000
Other $296,000
Other $124.000
Other $0
Other $0 $0
Other
$0 Other
$0 $0
Other
$0 $0 Other $0
Total $342,000
Total $315,000
Total $192.500 $1.925.000
Total $1.480.000
Total $620.000
Total $5.145.000
Total $150.000 $15,465.000
Total
$7.900.000 Total $150.000
$11,400,000
Total
$10.000.000 $10.000,000
Total $515.000
Page 180 of 300
STATE TRANSPORTA TION IMPROVEMENT PROGRAM W/2QQ5
Gwinnett
Project: 132986. Type Work: Replace Bridge
Descp: SR 120/DULUTH HIGHWAY@ SINGLETON CREEK
1.5 MI E OF DULUTH
Length: 0.38
TlP#: GW-290A&B
Project: 142285. Type Work: Replace Bridge
Descp: SR 324/GRAVEL SPRING RD @ 1-85 4.5 MI SE OF
BUFORD Lanes: Exist. 2
Prop. 4
Length: 0.25
TlP#: GW-289
Project: 150310. Type Work: Replace Bridge
Descp: CR 1958ITRICKUM ROAD@ YELLOW RIVER 4.5 MI
SW LAWRENCEVILLE Lanes: EXist. 2 Prop. 4
Length: 0.22
TlP#: GW-273
Project: 162526- Type Work: Sidewalks Descp: MILLER RD FM COLE DR TO HAMBRICK DR
Length: 0.83 TIP#: GW-AR-BPO
Project: 171630. Type Work: Park & Ride Lot Descp: SNELLVILLE AREA PARK & RIDEITRANSFER
CTR:NEAR US 78 @SR 124 Length: 0.40
TIP#: GW-AR-228
Project: 721000- Type Work: Widening
Descp: SR 120 FM STATE BRIDGE RD TO PEACHTREE
IND BLVD/GWINNEIT Lanes: Exist. 2 Prop. 4
Length: 6.54
TIP#: FN-003A
Project: 721940- Type Work: ATMSIITS Descp: ATMSI SR 410 COMM/SURVEIL FM
LAWRENCEV'LE HWY TO E PARK PL Length: 8.22
TlP#: AR-471
Project: 742920- Type Work: Bridge Rehab
Descp: CR 1319/MCGINNIS FERRY RD @
CHAITAHOOCHEE RVR/FORSYTH/GWINET
Lanes: Exist. 2 Prop. 4
Length: 0.60
TlP#: FN-233C
Project: 770315 Type Work: Rail Projects
Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)
PHASE 1
Length: 0.00
TIP#: AR-269A
Project: 770316 Type Work: Rail Projects
Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)
PHASE 2
Length: 0.00
TlP#: AR-269B
Project: M002825 Type Work: Concrete Rehab Descp: SR 316 FM SR 120 TO SR 8/US 29
LUMP SUM PROJECT
Length: 5.55 TlP#:
Phase Fund
PE
Bridge
ROW Bridge
CST STP
Year Underway
2005 2006
Federal
$326,400 $1,238,400
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
2007 After 2007 After 2007
Year 2005 LOCL After 2007
Federal $412,000
Federal $24,000 $0
Phase Fund ROW CMAQ CST CMAQ
Year 2005 2006
Federal $0
$302,400
State $81,600 $309,600
State $103,000
State $6,000 $0
State $0 $0
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2006
Phase Fund PE STP ROW STP CST STP
Year 2007 After 2007 After 2007
Phase Fund PE NHS CST Bond
Year 2006 2007
Federal
$0 $1,790,400
Federal $1,584,800
State
$0 $0
State $396,200
Federal $120,000
$0
State $30,000 $11,970,000
Phase Fund PE STP CST STP
Year 2005 2007
Federal $160,000 $1,600,000
State $40,000 $400,000
Phase Fund
PE
STP
PE
HPP
CST HPP
Year Underway Underway
2005
Federal
State
$592,000
$148,000
Phase Fund CST HPP
Year 2005
Federal $40,000,000
State $10,000,000
Phase Fund CST 1M
Year LUMP
Federal $9,000,000
State $1.000,000
Other $0 $0
Other $0
Other $0 $0
Other $100,000
$75,600
Other $100,000 $447,600
Other $0
Other $0 $0
Other $0 $0
Other
$0 Other
$0
Other $0
Total $408,000 $1.548,000
Total $515,000
Total $30,000
$0
Total $100,000 $378,000
Total $100,000 $2,238,000
Total $1,981,000
Total $150,000 $11,970,000
Total $200,000 $2,000,000
Total
$740,000
Total $50,000,000
Total $10,000,000
Page 181 of 300
STATE TRANSPORTA nON IMPROVEMENT PROGRAM za12QQ5
Gwinnett
Project: T000584 Type Work: Transit Projects
Descp: FY 2005 SECTION 5307 CAPITAL FOR GWINNETT
COUNTY
Length: 0.00
TlP#: AR.GW5307
Project: T000598 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR GWINNETT
COUNTY
Length: 0.00
TIP#: AR-GW.5310
Project: T000931 Type Work: Transit Projects
Descp: FY 2006 SECTION 5307 CAPITAL FOR GWINNETT
COUNTY
Length: 0.00
TlP#: ARGW5307
Project: T000995 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR GWINNETT COUNTY Length: 0.00
TlP#: ARGW5310
Project: T001115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rail Phase 11
Length: 0.00 TlP#:
Project: T001275 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR GWINNETT
COUNTY Length: 0.00
TlP#: AR-GW-5310
Project: T001329 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR GWINNETT
COUNTY Length: 0.00
TIP#: AR-GW.5307
Phase Fund
CST Transit
Year 2005
Phase Fund
CST Transit
Year 2005
Phase Fund
CST Transit
Year 2006
Phase Fund
CST Transit
Year 2006
Phase Fund
CST HPP
Year 2005
Phase Fund
CST Transit
Year 2007
Phase Fund
CST Transit
Year 2007
Federal $5,256,574
State $0
Other $1,314,143
Federal $64,066
State $16,017
Other $0
Federal $5,377,454
State $0
Other $1,344,363
Federal $67,270
State $16,817
Other $0
Federal $5,702,000
State $1,425,500
Other $0
Federal $70,633
State $17,658
Other $0
Federal $5,067,982
State $0
Other $1,266,996
Total
$6,570.717
Tolal
$80,083
Total
$6.721,817
Tolal
$84,087
Total
$7,127.500 Tolal
$86.291
Tolal
$6,334.978
Page 182 of 300
..e''.
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005
Habersham
Project: 0000139 Type Work: Bicycle/Ped. Facility
Descp: TALLULAH GORGE MULTIUSE TRAIL & BRIDGE
PHASE 3
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0000317 Type Work: Interchange
Descp: SR 365 @ LEVEL GROVE RD/IMP RAMPS/ADD
SIGNALS
Lanes: Exist. 0 Prop. 4
Length: 0.25
TlP#:
Project: 0000318 Type Work: Widening
Descp: SR 15CO FROM SR 365 TO US 441 UPGRADE TO 4
LANES
Lanes: Exist. 3 Prop. 4
Length: 0.50
TlP#:
Project: 0008447 Type Work: Intersection Improvement Descp: SR 385/US 441 @ PIEDMONT COLLEGE-
PEDESTRIAN BRIDGE Length: 0.40
LUMP SUM PROJECT
TlP#:
Project: 0006450 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN HABERSHAM/STEPHENS Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 132100. Type Work: Widening
Descp: SR 105/US 441 BUS FM CANNON BRIDGE RD TO
WALNUT ST/CORNELIA Lanes: Exist. 2 Prop. 6
Length: 2.74
TlP#:
Project: 171380. Type Work: Minor Widen & Resurf
Descp: CR 240/CR 81/LOW GAP RD FM CR 245INEW
LIBERTY TO RABUN CO.
Lanes: Exist. 1 Prop. 2
Length: 2.36
TlP#:
Phase Fund
PE
Local
ROW STP
CST STP
Year LOCL Underway LUMP
Phase Fund
PE
NHS
CST NHS
Year 2006 After 2007
Federal $0
$577,000
Federal $56,000
Phase Fund
PE
STP
CST STP
Year 2007 After 2007
Federal $107,200
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $0
$317,520
Federal $504,000
Phase PE ROW CST
Fund STP STP STP
Year Underway
2007 After 2007
Phase PE ROW CST
Fund Forest Hw Local Forest Hw
Year Underway
LOCL 2005
Federal $3,600,000
Federal $0
$2,239,000
State $0 $0
State $14,000
State $26,800
State $0
$35,280 State $126,000
State $900,000
State $0 $0
Other $0
$144,000 Other $0
Other $0
Other $0
$88,200 Other
$0
Other $0
Other $0 $0
Total $0
$721,000 Total
$70,000
Total $134,000
Total $0
$441,000 Total $630,000
Total $4,500,000
Total $0
$2,239,000
Page 183 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 27/2005
Hall
Project: 0006309 Type Work: Intersection Improvement Descp: SR 13/ATLANTA HIGHWAY AT HILTON DRIVE
Lanes: Exist. 2 Prop. 3 LUMP SUM PROJECT
Lenglh: 0.40 TlP#:
Project: 0006336 Type Work: ATMSIITS
Descp: ATMSII-985 COMMUNIC/SURVEILANCE FM 1-85TO
FLOWERY BRANCH
Length: 11,65
TIP#: AR-436
Project: 0006448 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ 7 LOC ALONG SR
131N HALL COUNTY
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006614 Type Work: Streetscapes
Descp: FLOWERY BRANCH HISTORIC DISTRICT
STREETS CAPE
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006615 Type Work: Multi-use Trail Descp: ROCK CREEK GREENWAY - PHASE"
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 110400. Type Work: Interchange
Descp: 1-985SPLIT DIAMOND INTERCHANGE @ SR 13 &
SR 53 & CD SYSTEM
Length: 3.40
TIP#:
Project: 110465. Type Work: Interchange Descp: 1-985 @ SR 11/US 129 NB EXIT LOOP & SB EXIT
Lanes: Exist. 2 Prop. 4
Length: 1.24 TIP#:
Project: 122010- Type Work: Widening
Descp: SR 369/BROWN'S BR RD FM FORSYTH CO LINE
TO SR 53
Lanes: Exist. 2 Prop. 4
Length: 4.93
TlP#:
Project: 122150- Type Work: Widening
Descp: SR 11/US 129 FM SR 332@ TALMO/JACKSON CO
TO SR 323/HALL CO
Lanes: Exist. 2 Prop. 4
Length: 6.73
TlP#:
Project: 122240. Type Work: Widening
Descp: SR 11IUS 129 FM SR 284/CLERMONT TO
CLEVELAND BYPIWHITE CO
Lanes: Exist. 2 Prop. 4
Length: 24.00
TIP#:
Project: 132250. Type Work: Passing Lanes
Descp: SR 52 FM 1 MILE NORTH OF SR 365 TO SOUTH OF
JULIAN WILEY RD
Lanes: Exist. 2 Prop. 3
Length: 2.50
TlP#:
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL LUMP
Phase Fund PE NHS CST Bond
Year 2006 2007
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
NHS
ROW NHS
CST Bond
Year Underway Underway
2006
Phase Fund
PE NHS
ROW 34A
ROW NHS
ROW STP
CST NHS
Phase Fund
PE
STP
ROW STP
ROW STP
CST STP
Phase Fund
PE
NHS
ROW NHS
ROW NHS
CST NHS
Phase Fund PE STP ROW STP CST STP
Year Underway Underway
2007 Underway After 2007
Year Underway
2007 After 2007 After 2007
Year Underway Underway
2005 After 2007
Year Underway
2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
2006 After 2007
Federal
$0 $315,000
State
$0 $35,000
Federal $120,000
$0
State $30,000 $13,000,000
Federal $392,000
State $98,000
Federal $321,600
State $0
Federal $500,000
State $0
Federal
State
$0 $44,401,000
Federal
State
$1,316,800
$329,200
Federal $4,312,000
State $1,078,000
Federal
State
$4,627,200 $1,156,800
Federal $2,741,600
State $685,400
Federal $3,200,000
State $800,000
Other $0 $0
Other $0 $0
Other $0
Other $80,400
Other $125,000
Other
$0 Other
$0 Other
$0
Other
$0 Other
$0
Other $0
Total $0
$350,000 Total $150,000 $13,000,000
Total $490,000
Total $402,000
Total $625,000
Total $44,401,000
Total $1,646,000
Total $5,390,000
Total $5,784,000
Total $3,427,000
Total $4,000,000
Page 184 of 300
..''
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
zaJ2QQ5
Hall
Project: 132995- Type Work: Replace Bridge Descp: SR 52 @ CANDLER CREEK 5.4 MI SOUTH OF LULA
Length: 0.22 TIP#:
Project: 142290. Type Work: Replace Bridge
Descp: SR 52@ CHATTAHOOCHEE RIVER 3 MI NW OF
LULA
Length: 0.27
TIP#:
Project: 142291. Type Work: Replace Bridge
Descp: SR 284 @CHATTAHOOCHEE RVRlLAKE LANIER 4
MI N OF GAINESVILLE
Length: 0.55
TlP#:
Project: 142292- Type Work: Replace Bridge
Descp: SR 323 @ NORTH OCONEE RIVER & OVERFLOW
7.5 MI SOUTH OF LULA
Length: 0.42
TlP#:
Project: 142294. Type Work: Replace Bridge Descp: SR 332 @ WALNUT CREEK 1.7 MI SW OF
CANDLER Length: 0.23
TlP#:
Project: 162430. Type Work: Widening
Descp: SR 347/FRIENDSHIP & THOMPSON MILL RD FM
1-985TO SR 211
Lanes: Exist. 2 Prop. 6
Length: 8.40
TlP#:
Project: TOO0674 Type Work: Transit Projects Descp: FY 2005 ACCESS TO JOBS FOR GAINESVILLE
Length: 0.00 TIP#:
Project: TOO0944 Type Work: Transit Projects Descp: FY 2006 ACCESS TO JOBS FOR GAINESVILLE
Length: 0.00 TIP#:
Project: T001253 Type Work: Transit Projects Descp: FY 2007 ACCESS TO JOBS FOR GAINESVILLE
Length: 0.00 TlP#:
Project: T001254 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 OPERATING ASSISTANCE
FOR GAINESVILLE Length: 0.00 TIP#:
Project: T001256 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 OPERATING ASSISTANCE
FOR GAINESVILLE Length: 0.00 TIP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 After 2007
Federal $12,000
State $3,000
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 After 2007 After 2007
Year Underway
2006 After 2007
Federat $800,000
State $200,000
Federal $383,200
State $95,800
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway After 2007
Federat
State
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 After 2007
Federal $12,000
State $3,000
Phase Fund
PE
STP
ROW STP
ROW STP
ROW STP
CST STP
Phase Fund
CST Transit
Year Underway Underway Underway
2005 After 2007
Year 2005
Federal
State
$5,482,400
Federal $320,000
$1,370,600
State $80,000
Phase Fund CST Transit
Year 2006
Federal $320,000
State $80.000
Phase Fund CST Transit
Year 2007
Federal $320,000
State $80,000
Phase Fund CST Transit
Year 2005
Federal $100,990
State $0
Phase Fund CST Transit
Year 2006
Federal $100,990
State $0
Other $0
Other $0
Other $0
Other
Other $0
Other
$0 Other
$0
Other $0
Other $0
Other $100,990
Other $100,990
Total $15,000
Total $1,000,000
Total $479,000
Total
Total $15,000
Total
$6,853,000 Total $400,000
Total $400,000
Total $400,000
Total $201,979
Total $201,979
Page 185 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Hall
Project: T001257 Type Work: Transit Projects
Descp: FY 2007 SECTION 5307 OPERATING ASSISTANCE
FOR GAINESVILLE
Length: 0.00
TIP#:
Project: T001258 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR
GAINESVILLE Length: 0.00
TIP#:
Project: T001259 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR
GAINESVILLE Length: 0.00
TlP#:
Project: T001260 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR
GAINESVILLE Length: 0.00
TIP#:
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2007
Federal $100,990
State $0
Federal $679,840
State $84,980
Federal $679,840
State $84,980
Federal $679,840
State $84,980
Other $100,990
Other $84,980
Other $84,980
Other $84,980
Total
$201,979
Total
$849,800
Total
$849,800
Total
$849,800
Page186of300
.:
''e......,''''
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM Wl2QQ5
Hancock
Project: 231270- Type Work: Replace Bridge Descp: SR 16 OVER THE OCONEE RIVER @ HANCOCK
COUNTY LINE Length: 1.00
TlP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Federal
State
$4,156,800 $1,039,200
Other $0
Total $5,196.000
Page 187 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Haralson
Project: 621580. Type Work: Passing Lanes
Descp: SR 120 FM W OF BUCHANAN BYP TO LAKE
OLYMPIA Lanes: Exist. 2 Prop. 4
Length: 1.20
TlP#:
Project: 63117 5- Type Work: Intersection Improvement Descp: SR 8 WIDEN;INTERSECT.IMP;BIKE-PED FM
FLORIDA AVE TO BRYAN ST Length: 0.25
TlP#:
Project: 632915. Type Work: Replace Bridge Descp: SR 120@ LITTLE RIVER IN EAST BUCHANAN
Length: 0.23 TlP#:
Project: 842350- Type Work: New Construction Descp: STOUFFEL RD FM SR 100 TO SR 8; GOLF COURSE
TO SR 8 NEW LOC Length: 0.90
TlP#:
Project: 642380- Type Work: Replace Bridge Descp: SR 100 AT WALKER CREEK 3 MI S OF
TALLAPOOSA Length: 0.22
TIP#:
Project: 671200- Type Work: Sidewalks Descp: STREETSCAPES & SIDEWALKS IN THE CITY OF
BREMEN Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: M002966 Type Work: Guardrail Descp: 1-20FROM ALABAMA STATE LINE TO SR 1/US 27
LUMP SUM PROJECT
Length: 24.00 TlP#:
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2005
Phase Fund ROW STP CST STP
Year 2006 2007
Federal
$1,462,400
Federal $170,400 $1,064,000
State
$365,600
State $42,600 $266,000
Phase Fund
PE
Bridge
CST Bridge
Year Underway
2005
Federal $806,400
State $201,600
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2005
Federal $11,757,600
State $2,939,400
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 2007
Federal
$12,000 $1,008,800
State
$3,000 $252,200
Phase Fund PE Local ROW Local CST STP
Year LOCL LOCL LUMP
Federal $0 $0
$344,800
State $0 $0 $0
Phase Fund PE NHS CST NHS
Year LUMP LUMP
Federal $1,600,000 $26,400,000
State $400,000 $6,600,000
Other
$0
Other $0 $0
Other $0
Other
$0
Other $0 $0
Other $0 $0
$86,200
Other $0 $0
Total
$1,828,000
Total
$213,000
$1,330,000
Total $1,008,000
Total
$14,697,000 Total
$15,000 $1,261,000 Total
$0
$0
$431,000 Total
$2,000.000
$33,000,000
.' Page188of300
.'
'.'I
STATE TRANSPORTATION IMPROVEMENT PROGRAM WI2DDS
Harris
Project: 0002382 Type Work: Landscaping
Descp: LANDSCAPING ON 1-185 IN HARRIS AND TROUP COUNTIES Length: 34.81
LUMP SUM PROJECT
TlP#:
Project: 0003084 Type Work: Replace Bridge
Descp: CR 140IWHITESVILLE ROAD @ STANDING BOY
CREEK TRIB. NORTH
Lanes: Exist. 1 Prop. 2
Length: 0.12
TIP#:
Project: 0003085 Type Work: Replace Bridge
Descp: CR 140IWHITESVILLE ROAD @STANDING BOY
CREEK TRIB. SOUTH
Lanes: Exist. 1 Prop. 2
Length: 0.13
TIP#:
Project: 0003086 Type Work: Replace Bridge
Descp: CR 140IWHITESVILLE ROAD @STANDING BOY
CREEK SO OF SR 315
Lanes: Exist. 1 Prop. 2
Length: 0.08
TlP#:
Project: 0003088 Type Work: Replace Bridge Descp: CR 393/LOWER BLUE SPRINGS @ BARNES
CREEK 2.4 MI SW HAMIL TON Length: 0.19
TIP#:
Project: 0003090 Type Work: Replace Bridge
Descp: CR 219/BROWN CREEK RD @ BROWN CREEK 5
MI NW OF WAVERLY HALL
Lanes: Exist. 1 Prop. 2
Length: 0.14
TIP#:
Project: 0006446 Type Work: Widening
Descp: SR llUS 27 FM TURNBERRY LN/MUSCOGEE TO
GATLIN LN/HARRIS
Lanes: Exist. 2 Prop. 4
Length: 6.26
TIP#: VET 2005
Project: 0006594 Type Work: Landscaping Descp: PINE MOUNTAIN BEAUTIFICATION
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006595 Type Work: Transportation museums
Descp: OLD MOUNTAIN HILL SCHOOLHOUSE MUSEUMPHASE II Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006596 Type Work: Multi-use Trail Descp: VILLAGE GREEN MULTI-MODAL TRAIL - PHASE II
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 331660- Type Work: Replace Bridge Descp: CR 387 @ PALMETTO CREEK 4 MI. SOUTH OF
PINE MOUNTAIN Length: 0.19
TIP#:
Phase Fund CST STP
Year LUMP
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2005
Phase Fund PE 114 ROW Local CST Bridge
Year Underway
LOCL 2005
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2005
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2006
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2005
Phase Fund PE STP ROW STP CST STP
Year 2007 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2006
Federal $449,600
State $112,400
Federal $0
$160,800
Federal $0
$200,800
Federal $0
$271,200
Federal $0
$333,600
Federal $0
$335,200
Federal $4,000
State $0
$40,200
State $0
$50,200
State $0
$67,800
State $0
$83,400
State $0
$83,800
State $1,000
Federal $320,000
State $0
Federal $80,000
State $0
Federal $84,800
State $0
Federal
$0 $441,600
State
$0 $110,400
Other $0
Other $10,000
$0 Other $10,000
$0 Other $10,000
$0 Other $20,000
$0 Other $20,000
$0 Other
$0
Other $80,000
Other $20,000
Other $21,200
Other $20,000
$0
Total $562,000
Total $10,000 $201,000
Total $10,000 $251,000
Total $10,000 $339,000
Total $20,000 $417,000 Total $20,000 $419,000
Total $5,000
Total $400,000
Total $100,000
Total $106,000
Total $20,000 $552,000
Page 189 ot 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM Za12005
Harris
Project: 333155- Type Work: Replace Bridge Descp: SR 1IUS 27@ MOUNTAIN CREEK 1,6 MI N OF SR
190 Lenglh: 0,25
TlP#:
Project: 333156. Type Work: Replace Bridge Descp: SR 103@ FLAT SHOALS CREEK 11,2 MI W OF SR
116 Length: 0,63
TIP#:
Project: 343370- Type Work: Replace Bridge
Descp: SR 116 @ LITTLE PALMETTO CREEK HAMIL TON -
NE SECTION
Lenglh: 0.42
TIP#:
Project: 343371- Type Work: Replace Bridge Descp: SR 116 @ PALMETTO CREEK 1.4 MI E OF SR 1
Length: 0,76 TlP#:
Project: 343372- Type Work: Replace Bridge Descp: SR 116 @ BETHLEHEM CRK AND BETHEL CRK 6
MILES NE OF HAMILTON Length: 0,80
TlP#:
Project: 370850- Type Work: Replace Bridge Descp: CR 20/MONUMENT RD @ HOUSE CREEK ,2 MI NW
OF WHITESVILLE Length: 0,21
TIP#:
Project: MOO0890 Type Work: Miscellaneous Improvement Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN
DISTRICT 3 Length: 0,00
LUMP SUM PROJECT
TlP#:
Project: MOO2440 Type Work: Rest Area
Descp: 1-85WEST POINT WELCOME CENTER RESTROOM RENOVATIONS Length: 0.40
LUMP SUM PROJECT
TlP#:
Project: MOO2782 Type Work: Bridges Descp: 1-85@CHATTAHOOCHEE RIVER - PROPOSED
DECK REHAB Length: 0,20
LUMP SUM PROJECT
TlP#:
Project: MOO2969 Type Work: Guardrail
Descp: 1-185 FM CS 2249/WILLIAMS RD/MUSCOGEE TO SR 1/TROUP Length: 30,32
LUMP SUM PROJECT
TIP#:
Phase Fund PE Bridge ROW Bridge CST Bridge
Phase Fund PE Bridge ROW Bridge CST Bridge
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund PE Bridge ROW Bridge CST Bridge
Phase Fund PE Bridge ROW Local CST Bridge
Phase Fund ROW STP CST STP
Phase Fund
PE
1M
CST 1M
Phase Fund
PE
1M
CST 1M
Phase Fund PE 1M CST 1M
Year Underway Underway
2005
Year Underway
2005 After 2007
Year Underway
2005 2005
Year Underway
2005 2005
Year Underway
2005 2006
Year Underway
LOCL 2006
Year Underway
LUMP
Year Underway
LUMP
Year LUMP LUMP
Year LUMP LUMP
Federal
$763.200
Federal $12.000
Federal $20.000
$880,000
Federal $68.000
$2.267.200
Federal $28.000
$1.522,400
Federal $0
$559.200
Federal $236.000
Federal $450,000
Federal $90.000
$900,000
Federal $1.800.000 $43,200,000
State
$190.800
State $3,000
State $5.000
$220,000
State $17,000 $566.800
State $7.000
$380.600
State $0
$139.800
State $59,000
State $50,000
State $10,000 $100,000
State $200,000 $4,800.000
Other
$0
Other $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $0 $0
Other $0 $0
Total
$954.000 Total $15.000
Total $25.000
$1.100.000 Total $85.000
$2.834.000 Total $35.000
$1.903.000 Total $0 $699.000 Total $295.000
Total $500.000
Total $100,000 $1.000.000
Total $2.000.000 $48.000.000
Page 190 of 300
'."1
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2012005
Hart
Project: 0003898 Type Work: Landscaping
Descp: LANDSCAPING ON 1-85 IN FRANKLIN AND HART
COUNTIES
Length: 3.25
LUMP SUM PROJECT
TlP#:
Project: 0006421 Type Work: Barriers
Descp: 1-a5CABLE MEDIAN BARRIERS IN HART &
FRANKLIN COUNTY
Length: 23.68
LUMP SUM PROJECT
TIP#:
Project: 0006606 Type Work: Strestscapes Descp: HARTWELL STREETSCAPE PHASE II
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 142275. Type Work: Replace Bridge
Descp: SR 172@ COLDWATER CREEK 8.5 MI E OF
ROYSTON
Length: 0.47
TIP#:
Phase Fund CST STP
Year LUMP
Federal $449.600
State $112,400
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $1,688,400
State $187.600
Phase Fund CST STP
Year LUMP
Federal $500.000
State $0
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 2007
Federal
$16,000 $1.015,200
State
$4,000 $253.800
Other $0
Other $0
Other $125.000
Other $0 $0
Total $562.000
Total $1,876,000
Total $625.000
Total $20,000 $1.269.000
Page 191 of 300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 217/2005
Heard
Project: 0006624 Type Work: Streetscapes Descp: FRANKLIN DOWNTOWN MULTI-USE TRAIL
FACILITIES & STREETSCAPE Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 343420.
Type Work: Replace Bridge
Descp: SR 100@ NEW RIVER 2.9 MI W OF CORINTH
Length: 0.25 TlP#:
Project: 343421- Type Work: Replace Bridge Descp: SR 100 @ CLEAR CREEK 4.2 MI W OF CORINTH
Length: 0.22 TlP#:
Phase Fund CST STP
Year LUMP
Federal $224,800
State $0
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2007
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2007
Federal
$11,200 $880,000
Federal
$11,200 $880,000
State $2,800
$220,000
State $2,800
$220,000
Other $56,200
Total $281,000
Other
$0 $0
Other
$0 $0
Total
$14.000 $1,100,000
Total $14,000 $1,100,000
,(.I
Page192of300
..'J
STA TE TRANSPORTATION IMPROVEMENT PROGRAM W/2QQ5
Henry
Project: 0000294 Type Work: Widening
Descp: SR 3IUS 19/41 FM LAPRADE RD/CR 18 TO SR 20 IN
HENRY COUNTY
Lanes: Exist. 4 Prop. 6
Length: 8.55
TfP#: HE-166
Project: 0000298 Type Work: Intersection Improvement Descp: SR 155 AT KELLYTOWN ROAD/CR 107
Length: 0.25 TIP#: HE-160
Project: 0000528 Type Work: Lighting
Descp: 1-75@ BILL GARDNER PARKWAY INTERCHANGE-
LIGHTING
Length: 0.40
LUMP SUM PROJECT
TIP#: LUMP
Project: 0000561 Type Work: New Construction
Descp: GRTACAMPGROUND RD EXT FM JODECO RD TO
SR 42 @CAMPGROUND RD
Lanes: Exist. 0 Prop. 2
Length: 1.50
TfP#: HE-IIO
Project: 0000562 Type Work: Minor Widen & Resurf Descp: HAMPTON-LOCUST GROVE RD FM STRICKLAND
RD TO 1-75: PH 1 -GRTA Length: 5.08
TfP#: HE-126BI&
Project: 0000883 Type Work: Intersection Improvement Descp: SR 138 AT FLAT ROCK ROAD/CR 100
LUMP SUM PROJECT
Length: 0.47 TfP#: AR-157
Project: 0001055 Type Work: Intersection Improvement Descp: SR 155 AT RACE TRACK ROADICR 376
LUMP SUM PROJECT
Length: 0.42 TIP#: AR-118
Project: 0001096 Type Work: New Construction
Descp: MCDONOUGH PARKWAY EXT FM JONESBORO RD
TO SR 421US 23 PHASE 1
Lanes: Exist. 0 Prop. 2
Length: 1.20
TfP#: HE-118B
Project: 0002638 Type Work: Widening
Descp: EAGLE'S LANDING PARKWAY/CR 659 FROM SR 42
TO JODECO ROAD Lanes: Exist. 2 Prop. 4
Length: 3.66
TIP#: HE-132BI&
Project: 0002857 Type Work: Bicycle/Ped. Facility
Descp: OLD ATLANTA RD/EAST ATLANTA RD/REEVES CREEK TRAIL (LCI PROJ) Length: 0.00
LUMP SUM PROJECT
TfP#: HE-AR-227
Project: 0002858 Type Work: Bicycle/Ped. Facility
Descp: SOUTH LEE STREET FM US 23 TO ROCK QUARRY
RD (LCI PROJ)
Length: 0.44
LUMP SUM PROJECT
TIP#: HE AR 228
Phase PE ROW CST
Fund NHS NHS NHS
Year 2007 After 2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2006
Phase Fund CST NHS
Year LUMP
Phase PE ROW CST
Fund Local Local Bond
Year LOCL LOCL 2006
Phase PE ROW CST
Fund Local Local Bond
Year LOCL LOCL 2006
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
LUMP
Phase Fund
PE
Local
ROW Local
CST Bond
Year LOCL LOCL 2005
Phase PE ROW CST
Fund Local Local Bond
Year LOCL LOCL 2006
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL LUMP
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL LUMP
Federal $688,000
State $172,000
Other $0
Federal
$180,000 $516,000
Federal $167,200
State
$45,000 $129,000
State $41,800
Other
$0 $0
Other $0
Federal $0 $0 $0
State $0 $0
$2,600,000
Other $250,000 $700,000
$0
Federal $0 $0 $0
State $0 $0
$2,000,000
Other $1,000,000 $1,500,000 $8,000,000
Federal
$0 $1,260,000
State
$0 $140,000
Other
$452,900 $0
Federal
State
Other
$551,700
$61,300
$0
Federal $0 $0 $0
State $0 $0
$1,800,000
Other $300,000 $300,000 $1,200,000
Federal $0 $0 $0
State $0 $0
$5,526,000
Other $260,000 $2,500,000
$0
Federal
$0 $480,000
State
$0 $0
Other
$0 $120,000
Federal
$0 $400,000
State
$0 $0
Other
$0 $100,000
Total $860,000
Total $225,000 $645,000
Total $209,000
Total $250,000 $700,000 $2,600,000
Total $1,000,000 $1,500,000 $10,000,000
Total $452,900 $1,400,000
Total
$613,000
Total $300,000 $300,000 $3.000,000
Total $260,000 $2,500.000 $5,526.000
Total $0
$600,000
Total $0
$500,000
Page 193 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 20/2005
Henry
Project: 0003167 Type Work: HOV Lanes
Descp: 1-75 FM SR 54/CLAYTON TO EAGLES LANDING
PKY/HENRY HOV LANES
Lanes: Exist. 8 Prop. 10
Length: 8.16
TlP#: AR-H-05IA
Project: 0003436 Type Work: HOV Lanes
Descp: 1-75 FM EAGLES LANDING PKY TO SR 155 - FOR
HOVLANES Lanes: Exist. 6 Prop. 8
Length: 7.84
TIP#: AR-H-052A
Project: 0003784 Type Work: Intersection Improvement
Descp: SR 3IUS 19/41 AT SR 81/CR 653/UPPER WOOLSEY
ROAD
Length: 0.78
LUMP SUM PROJECT
TlP#: AR-118
Project: 0003903 Type Work: Intersection Improvement Descp: SR 20@ CR 133/AIRLINE ROAD
LUMP SUM PROJECT
Length: 0.42 TlP#: AR-157
Project: 0003905 Type Work: Intersection Improvement
Descp: SR 155 @ CR 650/HAMPTON-LOCUST GROVE ROAD Length: 1.00
LUMP SUM PROJECT
TIP#: AR-157
Project: 0004431 Type Work: New Construction Descp: PATRICK HENRY PKWY FM END OF EXISTING RD
TO EAGLES LANDING Length: 0.47
TlP#: HE-165A
Project: 0004432 Type Work: Widening Descp: ROCK QUARRY ROAD FROM EAGLES LANDING
PARKWAY TO RED OAK RD Length: 1.51
TIP#: HE-16IA
Project: 0004645 Type Work: New Construction
Descp: EAST LAKE ROAD EXTENSION FM SPRINGDALE
RD TO SR 155 PHASE 2
Lanes: Exist. 0 Prop. 2
Length: 0.44
TlP#: HE103B
Project: 0006278 Type Work: Sidewalks Descp: DOWNTOWN STREETSCAPE ALONG E
ATLANTAIWEST STIUS231LEE - LCI Length: 0.00
LUMP SUM PROJECT
TlP#: HE-AR 230
Project: 0006307 Type Work: Water Pollution Mitig. Descp: TOWALIGA RIVER RESTORATION AND WETLAND
MITIGATION Length: 0.00
LUMP SUM PROJECT
TlP#: LUMP
Project: 0006333 Type Work: ATMSIITS Descp: ATMS/I-75 S COMMUNIC/SURVEILANCE FM
HUDSON BRIDGE TO SR 155 Length: 7.84
TlP#: AR-431
Phase Fund PE NHS ROW Bond CST NHS
Year 2006 After 2007 After 2007
Phase Fund PE NHS ROW Bond CST NHS
Year 2006 After 2007 After 2007
Phase Fund ROW STP CST STP
Year Underway
LUMP
Phase Fund ROW Local CST STP
Year LOCL LUMP
Phase Fund ROW Local CST STP
Year LOCL LUMP
Phase Fund CST Bond CST Bond
Year 2005 2005
Phase Fund PE Local ROW Local CST Bond
Year LOCL LOCL 2006
Phase Fund PE Local ROW Local CST RRBS
Year LOCL LOCL 2005
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase Fund CST STP
Year LUMP
Phase Fund PE NHS CST NHS
Year 2005 2006
Federal $6,400,000
State $1,600,000
Other $0
Federal $5,840,000
State $1,460,000
Other $0
Federal $902,700
State $100,300
Other $0
Federal $0
$209,700
State $0
$23,300
Other $111,650
$0
Federat $0
$879,300
State $0
$97,700
Other $4,847,200
$0
Federal $0 $0
State $4,280,000
$994,000
Other $0 $0
Federal $0 $0 $0
State $0 $0
$2,730,000
Other $125,000 $750,000 $1,270,000
Federal $0 $0 $0
State $0 $0
$3,600,000
Other $360,000 $2,000,000 $1,600,000
Federa/
$80,000 $800,000
State
$0 $0
Other
$20,000 $200.000
Federal $567,200
State $141,800
Other $0
Federal $120,000 $7.200,000
State $30,000 $1,800,000
Other $0 $0
Total
$8,000,000
Total
$7,300,000
Total $1,003,000
Total
$111,650
$233,000
Totat $4,847,200
$977,000
Total $4,280,000
$994,000
Total $125,000
$750,000
$4,000,000 Total $360,000
$2,000,000
$5,200.000 Total $100,000
$1,000,000 Total
$709.000
Total $150,000
$9,000,000
Page 194of300
STATE TRANSPORTA TION IMPROVEMENT PROGRAM ZaL2005
Henry
Project: 0006401 Type Work: ATMS/ITS
Descp: ATMS/I-75 S RAMP METERS-HAR FM HUDSON BR
TO CLEVELAND AVE
Lenglh: 17.35
TIP#: AR-443
Project: 0006646 Type Work: Streetscapes Descp: DOWNTOWN LOCUST GROVE STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TlP#:
p'roject: 0006647 Type Work: Multi-use Trail Descp: REEVES CREEK TRAIL & GREENWAY
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 0006650 Type Work: Streetscapes
Descp: DOWNTOWN HAMPTON STREETSCAPE
IMPROVEMENTS
Lenglh: 0.00
LUMP SUM PROJECT
TIP#:
Project: 245380. Type Work: Replace Bridge Descp: SR 20 @ SOUTH RIVER NEWTON-HENRY CO LINE
Lenglh: 0.61 TlP#: NEOI2
Project: 312160- Type Work: Interchange
Descp: 1-75@ JODECO ROAD/CR 824 - INTERCHANGE
IMPROVEMENT Lanes: Exist. 2 Prop. 6
Length: 1.00
TIP#: HE-AR-216
Project: 321530 Type Work: Realignment
Descp: E-W 1-WAY/SR 20 FM HIGHLAND AVE TO LEMON
ST Lanes: Exist. 2
Prop. 4
Length: 1.75
TIP#: HE-020B
Project: 322050 Type Work: Widening
Descp: SR 42 FM SR 138/STOCK'GE TO 1-675 NB
RAMPSI&CLVERT Lanes: Exist. 2 Prop. 4
Length: 2.30
TIP#: CL-064
Project: 323050 Type Work: Replace Bridge
Descp: SR 138 @ BIG COTTON INDIAN CREEK 3 MI E OF
STOCKBRIDGE
Length: 0.22
TlP#: HE-IS7
Project: 323070 Type Work: Intersection Improvement Descp: SR 138 AT MILLERS MILL ROAD/CR 665
Length: 0.57 TlP#: HE-14S
Project: 323075 Type Work: Intersection Improvement Descp: SR 138 AT SR 155
LUMP SUM PROJECT
Length: 0.40 TlP#: AR-IS7
Phase Fund
PE
NHS
CST Bond
Year 2006 2007
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Phase Fund
PE
NHS
ROW Bond
CST Bond
Year Underway
2007 After 2007
Phase PE ROW CST
Fund STP STP STP
Year Underway
2007 After 2007
Phase PE ROW CST
Fund STP STP STP
Year Underway
2007 After 2007
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Phase Fund PE STP PE STP ROW STP CST STP
Phase PE ROW CST
Fund Local Local STP
Year Underway
2005 2006 After 2007
Year LOCL LOCL LUMP
Federal $20,000 $0
State $5,000
$1,500,000
Federal $543,200
State $0
Federal $560,000
State $0
Federal $500,000
State $0
Federal
State
$1,785,600
$446,400
Federal
State
$0 $17,053,000
Federal $9,064,000
State $2,266,000
Federal $1,889,600
State $0
Federal
State
$1,243,200
Federal
$80,000 $80,000
Federal $0 $0
$792,900
$310,800
State
$0 $0
State $0 $0
$88,100
Other $0 $0
Other $135,800
Other $140,000
Other $125,000
Other
$0 Other
$0
Other $0
Other $472,400
Other
$0 Other $20,000 $20,000 Other $30,000 $387,000
$0
Total $25,000
$1,500,000
Total $679,000
Total $700,000
Total $625,000
Total
$2,232,000 Total
$17,053,000
Total $11,330,000
Total $2,362.000
Total
$1,554,000 Total $100,000 $100,000 Total $30.000 $387,000 $881,000
Page 195 of 300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 217/2005
Henry
Project: 331980- Type Work: Widening Descp: SR 920/JONESBORO RD FM 1-75 TO 1-WAY PAIR
IMCDONOUGH &BR Lanes: Exist. 2 Prop. 4
Length: 2.86
TlP#: HE-920A
Project: 331990- Type Work: Replace Bridge Descp: SR 920/JONESBORO ROAD @ BIRCH CREEK
Length: 0.25 TIP#: HE 007B
Project: 332467-
Type Work: Replace Bridge
Descp: SR 155@L1TTLE COTTON INDIAN CRK 5 MI N OF
MCDONOUGH
Length: 0.42
TIP#: HE-128A&B
Project: 332945- Type Work: Signals Descp: SR 81 AT KEYS FERRY RD
LUMP SUM PROJECT
Length: 0.42 TlP#: AR-157
Project: 332970. Type Work: Signals Descp: SR 81 AT NEW HOPE RD
LUMP SUM PROJECT
Length: 0.20 TlP#: AR-157
Project: 332915. Type Work: Intersection Improvement Descp: SR 81 AT RACETRACK RD/CR 376
LUMP SUM PROJECT
Length: 0.31 TlP#: AR-157
Project: 332980. Type Work: Signals Descp: SR 155 AT FAIRVIEW RD
LUMP SUM PROJECT
Length: 0.20 TlP#: AR-157
Project: 333126. Type Work: Replace Bridge Descp: SR 155@WALNUTCREEKATMCDONOUGH CITY
LIMITS Length: 0.43
TlP#: HE-154
Project: 333127. Type Work: Replace Bridge
Descp: SR 155 @ BIG COTTON INDIAN CREEK 6 MI N OF
MCDONOUGH
Length: 0.57
TlP#: HE-155A&B
Project: 333295- Type Work: Intersection Improvement Descp: SR 155@MILLERS MILL RD/CR 665
LUMP SUM PROJECT
Length: 0.28 TIP#: AR-157
Project: 342970. Type Work: Widening
Descp: SR 920 FM SR 3/US 19-41/CLAYTON TO 1-75 IN
HENRY (REL SR 81)
Lanes: EXist. 2 Prop. 4
Length: 3.59
TlP#: HE-115
Phase Fund PE STP ROW STP CST STP
Year Underway Underway
2005
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Local
ROW Local
CST STP
Year Underway
2005 2006 2006
Year LOCL LOCL LUMP
Phase Fund PE Local ROW Local CST STP
Year LOCL LOCL LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Phase Fund PE Bridge ROW Local CST Bridge CST STP
Phase PE ROW CST
Fund STP Local STP
Year Underway
2005 2006 2006
Year LUMP LOCL LUMP
Phase Fund PE STP ROW STP CST STP
Year 2006 After 2007 After 2007
Federal
State
$6.730,400 $1.682,600
Federal
$0 $668.800
State
$0 $167,200
Federat
$135,200 $575,200 $640.000
Federat $0 $0
$30,600
State
$33,800 $143,800 $160.000
State $0 $0
$3,400
Federal $0 $0
$32,400
State $0 $0
$3,600
Federal
$0 $229,500
State
$0 $25,500
Federal $0 $0
$38.700
State $0 $0
$4.300
Federat
State
$1.240,800
Federat
$0 $57.600 $480,000 Federat $159,300
$0 $1.060.200
Federal $1.200.000
$310,200
State
$0 $14,400 $120.000 State $17.700
$0 $117,800
State $300.000
Other
$0
Other
$0 $0
Other
$0 $0 $0 Other $0 $113,400 $0
Other $0 $0 $0
Other
$112,700 $0
Other $0 $0 $0
Other
$0
Other
$120,000 $0 $0
Other $0
$50.000 $0
Other $0
Total
$8,413.000
Total $0
$836.000
Total $169,000 $719.000 $800,000 Total
$0 $113.400
$34.000
Total $0 $0
$36.000
Total $112,700 $255.000
Total $0 $0
$43,000
Total
$1.551,000
Total $120,000
$72.000 $600.000 Total $177,000
$50,000 $1.178.000
Total $1,500.000
Page 196 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Henry
Project: 343395- Type Work: Replace Bridge
Descp: SR 20 @ WALNUT CREEK 6 MI NE OF
MCDONOUGH
Length: 0.23
TIP#: IIE-158A
Project: 343396- Type Work: Replace Bridge
Descp: SR 20 @ BIG COTTON INDIAN CREEK 9 MI NE OF
MCDONOUGH
Length: 0.57
T1P#: IIE-\62
Project: 343500- Type Work: Intersection Improvement Descp: OLD CONYERS RD/CR 69 @ FLAT ROCK RD/CR
100 Length: 0.40
T1P#: IIE-144
Project: 351230- Type Work: Signals Descp: WALT STEPHENS RD AT SPEER RD
Length: 0.20 T1P#: IIE-125
Project: 351240- Type Work: Intersection Improvement Descp: FAIRVIEW RD/CR 676 @ THURMAN DR/CR 25
Length: 0.40 T1P#: IIE-147
Project: 721480- Type Work: Widening
Descp: SR 138 FM WALT STEPHENS RD/CLAYTON EAST
TO 1-75/HENRY CO Lanes: Exist. 2 Prop. 4
Length: 4.27
T1P#: CL-D3\
Project: 770321- Type Work: Rail Projects
Descp: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON)
PHASE 2
Length: 0.00
TIP#: AR-26813
Project: M001994 Type Work: Bridges
Descp: BRIDGE JACKING @ SEV LOCS IN BUTTSISPALDINGIHENRY COUNTIES Length: 1.60
LUMP SUM PROJECT
T1P#: AR-3\1
Project: M002785 Type Work: Bridges
Descp: 1-75@ CABIN CREEK IN BUTTS & SR 20 IN HENRY
-DECK REHAB
Length: 0.80
LUMP SUM PROJECT
TIP#:
Project: 1000599 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR HENRY
COUNTY
Length: 0.00
T1P#: AR-HE-1510
Project: 1000996 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR HENRY
COUNTY
Length: 0.00
TIP#: AR-HE-1510
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2006
Federal
$59,200 $888,000
State
$14,800 $222,000
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Federal $1,232,800
State $308,200
Phase PE ROW CST
Fund Local Local STP
Year LOCL LOCL 2006
Federal $0 $0
$320,000
State $0 $0 $0
Phase Fund PE Local ROW Local CST STP
Year LOCL LOCL 2006
Federal $0 $0
$34,000
State $0 $0 $0
Phase Fund PE Local ROW Local CST STP
Year LOCL LOCL 2007
Federal $0 $0
$164,000
State $0 $0 $0
Phase PE ROW CST
Fund NHS NHS NHS
Year Underway Underway
2005
Federal $10,632,000
State $2,658,000
Phase Fund CST NHS
Year 2005
Federal $7,728,000
State $1,932,000
Phase Fund
PE
NHS
CST NHS
Year Underway
LUMP
Federal $1,200,000
State $300,000
Phase Fund
PE
1M
CST 1M
Year LUMP LUMP
Federal $90,000
$900,000
State $10,000 $100,000
Phase Fund CST Transit
Year 2005
Federal $18,305
State $4,576
Phase Fund CST Transit
Year 2006
Federal $19,220
State $4,805
Other $0 $0
Other
$0
Other $40,000 $300,000 $80,000
Other $4,000
$0 $9,000
Other $20,000 $300,000 $41,000
Other
$0
Other $0
Other $0
Other $0 $0
Other $0
Other $0
Total $74,000 $1,110,000
Total
$1,541,000
Total $40,000 $300,000 $400,000
Total $4,000 $0
$43,000
Total $20,000 $300,000 $205,000
Total
$13,290,000
Total $9,660,000
Total $1,500,000
Total $100,000 $1,000,000
Total $22,881
Total $24,025
Page 197 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM W/2QQ5
Henry
Project: T001216 Type Work: Transit Projects
Descp: FY 2001 SECTION 5310 CAPITAL FOR HENRY
COUNTY
Length: 0.00
TlP#: AR.HE.1510
Project: T001364 Type Work: Rail Projects Descp: COMMUTER RAIL ATLANTA/LOVEJOY
(OPERATIONS ASSISTANCE) Length: 0.00
TlP#: AR-268F
Phase Fund CST Transit
Year 2001
Federal $20,181
State $5,045
Other $0
Phase Fund CST CMAQ
Year 2006
Federal $5,500,000
State $0
Other $1,375,000
Total $25,226 Total $6,875,000
Page 198 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Houston
Project: 0001018 Type Work: Bicycle/Ped Facility
Desep: DNR REC TRAILS-BAY GALL CREEK GREENWAY FM CORDER TO KIMBERLY Length: 1.07
LUMP SUM PROJECT
TlP#: Q94(1)
Project: 0002336 Type Work: Miscellaneous Improvement
Desep: GA NAT'L FAIRGROUNDS & AGRICENTER LINK TO HISTORIC DOWNTOWN Length: 0.00
LUMP SUM PROJECT
TlP#: Q22(1)
Project: 322965. Type Work: Replace Bridge
Descp: SR 247/US 129 NBL @ ECHECONNEE CREEK
HOUSTON-BIBB CO LINE
Lanes: Exist. 2 Prop. 3
Length: 0.27
TIP#: 1998-1
Project: M002783 Type Work: Bridges
Desep: 1-75@ 2 LOCS IN DOOL Y & 1 LOC IN HOUSTON -
DECK REHAB
Length: 1.20
LUMP SUM PROJECT
TIP#:
Project: TOO0671 Type Work: Transit Projects
Desep: FY 2005 SECTION 5310 CAPITAL FOR WARNER
ROBINS
Length: 0.00
TIP#:
Project: TOO0930 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR WARNER
ROBINS
Length: 0.00
TlP#:
Project: TOO1250 Type Work: Transit Projects
Desep: FY 2007 SECTION 5310 CAPITAL FOR WARNER
ROBINS
Length: 0.00
TlP#:
Phase Fund CST Ree Trails
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
Bridge
CST Bridge
Year Underway
2006
Phase Fund
PE
1M
CST 1M
Year LUMP LUMP
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2007
Federal $100,000
Federal $400,000
Federal $2.400,000
Federal $135.000 $1,350.000
Federal $22.881
Federat $25.170
Federal $25.226
State $0
State $0
State $600,000
State $15.000 $150.000
State $5.720
State $6.293
State $6,307
Other $25,000
Other $100,000
Other $0
Other $0 $0
Other $0
Other $0
Other $0
Total $125,000
Total $500,000
Totat $3,000.000
Total $150,000 $1.500,000
Total $28.601
Totat $31.463
Total $31.533
Page 199 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2a/2QQ5
Irwin
Project: 0001046 Type Work: Widening
Descp: SR 32 FM NE OCILLA BYP TO 4 LANE @CR
2961MITCHELL RD Lanes: Exist. 2 Prop. 4
Length: 19.04
TlP#:
Project: 0004798 Type Work: Widening
Descp: SR 32 FROM EAST OF 1-75/TURNER TO SR
125/IRWIN Lanes: Exist. 2 Prop. 4
Length: 10.34
TlP#:
Project: 0004799 Type Work: Widening Descp: SR 321SR 125 COMMON SECTION
Lanes: Exist. 2 Prop. 4
Length: 4.57 TlP#:
Project: 0005069 Type Work: Widening Descp: SR 32 FM SR 125 TO SR 11
Lanes: Exist. 2 Prop. 4
Length: 5.00 TlP#:
Project: 0006538 Type Work: Streetscapes
Descp: IRWIN CO HISTORIC COURTHOWSE -
STREETSCAPE ONLY
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006539 Type Work: Bicycle/Ped. Facility Descp: OCILLA PEDESTRIAN FACILITIES
LUMP SUM PROJECT
Length: 0.00 TlP#:
Phase PE ROW CST
Fund State State State
Year 2005 After 2007 After 2007
Phase Fund
PE
State
ROW State
CST State
Year 2005 After 2007 After 2007
Phase Fund PE State ROW State CST State
Year 2005 After 2007 After 2007
Phase Fund
PE
State
ROW State
CST State
Year 2005 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Federal $0
Stale $3.900,000
Federal $0
Slale $988,000
Federal $0
Slale $494,000
Federal $0
Slale $494.230
Federal $50,400
Slale $0
Phase Fund CST STP
Year LUMP
Federal $500,000
Slale $0
Other $0
Other $0
Other $0
Other $0
Other $12.600
Other $125,000
Total
$3,900.000
Total
$988,000
Total
$494,000
Total
$494,230 Total
$63,000
Total
$625,000
Page 200 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
2flI2QQ5
Jackson
Project: 0001933 Type Work: Intersection Improvement Descp: SR 98 @ B. WILSON/CR 286 & KING ROAD/CR 536
LUMP SUM PROJECT
Length: 0.42 TIP#:
Project: 0006015 Type Work: Water Pollution Mitig.
Descp: 748 STREAM CREDITS TO MITIGATE PI# 171004
&171005 JACKSON CO
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006119 Type Work: Railroad Crossing Descp: CR 213/JOHN BROOKS ROAD@ CSX #848484L
LUMP SUM PROJECT
Length: 0.20 TIP#:
Project: 0006493 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS@ VAR LOC ALONG
SR 11&SR 98 - JACKSON Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 110620- Type Work: Widening
Descp: 1-85FM N/SR 211 TO N/SR 60 IN JACKSON
COUNTY Lanes: Exist. 4
Prop. 6
Length: 5.94
TlP#: BA-008A&B
Project: 110630- Type Work: Widening Descp: 1-85FM N/SR 60 TO N/SR 11
Lanes: Exist. 4 Prop. 6
Length: 4.60 TlP#:
Project: 110640. Type Work: Widening Descp: 1-85FM N/SR 11 TO N/SR 82
Lanes: Exist. 4 Prop. 6
Length: 3.80 TIP#:
Project: 110650- Type Work: Widening Descp: 1-85FM N/SR 82 TO N/SR 98
Lanes: Exist. 4 Prop. 6
Length: 6.10 TlP#:
Project: 110660- Type Work: Widening Descp: 1-85FM N/SR 98 TO N/SR 15 IN BANKS
Lanes: Exist. 4 Prop. 6
Length: 2.70 TlP#:
Project: 122150- Type Work: Widening
Descp: SR 11/US 129 FM SR 332@TALMO/JACKSON CO
TO SR 323!HALL CO Lanes: Exist. 2 Prop. 4
Length: 6.73
TIP#:
Project: 122160 Type Work: Widening
Descp: SR 15ALT/US 129 FM LAVENDER DR/CLARKE TO
SR 330/JACKSON Lanes: Exist. 2 Prop. 4
Length: 3.71
TIP#: R-33
Phase PE ROW CST
Fund STP STP STP
Year Underway
LUMP LUMP
Phase Fund ROW STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase PE ROW CST
Fund NHS NHS Bond
Year Underway
2005 2007
Phase PE PE CST
Fund NHS NHS Bond
Year Underway
2005 After 2007
Phase PE PE CST
Fund NHS NHS Bond
Year Underway
2005 After 2007
Phase PE PE CST
Fund NHS NHS Bond
Year Underway
2005 After 2007
Phase Fund
PE
NHS
PE
NHS
CST Bond
Year Underway
2005 After 2007
Phase PE ROW ROW CST
Fund NHS NHS NHS NHS
Phase PE ROW CST
Fund STP STP STP
Year Underway Underway
2005 After 2007
Year Underway Underway
2005
Federal
$33,300 $269,100
Federal $28,000
State
$3,700 $29,900
State $7,000
Federal $210,000
State $0
Federal $396,000
State $99,000
Federal
State
$320,000 $0
$80.000 $13,495.000
Federal $1.760.000
State $440.000
Federal $1.360.000
State $340.000
Federal $2.080.000
State $520.000
Federal $880,000
State $220.000
Federal
State
$4.627,200
$1.156,800
Federal
State
$9.212.000
$2.303,000
Other
$0 $0
Other $0
Total
$37,000 $299,000
Total $35,000
Other $0
Total $210,000
Other $0
Total $495,000
Other
$0 $0
Total
$400,000 $13,495,000
Other $0
Total $2,200,000
Other $0
Total $1.700.000
Other $0
Total $2.600.000
Other $0
Total $1,100.000
Other
Total
$0 Other
$5.784,000 Total
$0
$11.515,000
Page 201 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005
Jackson
Project: 122170-
Type Work: Widening
Descp: SR 15 ALTIUS 129 FM SR 330 TO JEFFERSON BYP
@CR104 Lanes: Exist. 2 Prop. 4
Length: 6.70
TIP#:
Project: 122300- Type Work: Widening
Descp: SR 15/US 441 FROM THE CLARKE/JACKSON
COUNTY LINE TO SR 335
Lanes: Exist. 2 Prop. 4
Length: 6.98
TIP#:
Project: 122310- Type Work: Widening Descp: SR 15IUS 441 FM SR 335 TO COMMERCE BYPASS
Lanes: Exist. 2 Prop. 4
Length: 5.19 TlP#:
Project: 122510- Type Work: Bridge Rehab Descp: SR 15 ALT IN JEFFERSON AT BIG CURRY CREEK
Lanes: Exist. 2 Prop. 3
Length: 0.60 TlP#:
Project: M002916 Type Work: Resurface & Maintenance Descp: SR 334 FM SR 15/US 441 TO SR 98
LUMP SUM PROJECT
Length: 12.48 TlP#:
Phase Fund
PE
STP
ROW STP
ROW STP
CST STP
Phase Fund PE State ROW Bond CST Bond
Year Underway Underway
2006 After 2007
Year Underway Underway
2005
Phase Fund PE NHS ROW Bond CST Bond
Year Underway Underway
2005
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2006 After 2007
Phase Fund CST STP
Year 2005
Federal
State
$3,254,400 Federal
$813,600 State
$0 $22,626,000
Federal
State
$0 $20,360,000
Federal $320,000
State $80,000
Federal $1,113,509
State $278,377
Other $0
Other $0
Other
$0 Other
$0
Other $0
Total $4,068,000
Total $22,626,000 Total
$20,360,000
Total
$400,000
Total $1,391,886
Page 202 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM
2!7/2QQ5
Jasper
Project: 0000423 Type Work: Widening
Descp: SR 16 WIDENING AT WEST CITY LIMITS OF
MONTICELLO Lanes: Exist. 2 Prop. 4
Length: 0.87
TIP#:
Project: 0001939 Type Work: New Construction Descp: MONTICELLO NE BYPASS FM SR 16 TO SR 83
Lanes: Exist. 0 Prop. 2
Length: 3.28 TlP#:
Project: 0002337 Type Work: Landscaping
Descp: MONTICELLO DOWNTOWN STREETSCAPE AND SCENIC BYWAY BIKEWAY Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0004444 Type Work: Guardrail
Descp: SR 212 OVER LAKE JACKSON GUARDRAIL AT
APPROACHES
Length: 0040
LUMP SUM PROJECT
TIP#:
Project: 332510- Type Work: Replace Bridge Descp: SR 16 OVER OCMULGEE RIVER AT JASPER
CL(M.L.17.45) Length: 1.17
TlP#:
Project: MOO0355 Type Work: Miscellaneous Improvement
Descp: SR 83 AT CHURCH STREET IN MONTICELLO DRAINAGE IMPROVEMENTS
Length: DAD
LUMP SUM PROJECT
TIP#:
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund CST STP
Phase PE ROW CST
Fund STP STP STP
Phase PE ROW CST
Fund STP STP STP
Phase Fund ROW STP CST STP
Year Underway
2007 After 2007
Year Underway
2007 After 2007
Year LUMP
Year Underway
LUMP LUMP
Year Underway Underway
2005
Year LUMP LUMP
Federal $447,200
Federal $183,200
Federal $400,000
Federal $129,600 $122,400 Federal
$3,628,800 Federal $2,400 $169,600
State $111,800
State $45,800
State $0
State $14,400 $13,600 State
$907,200 State
$600 $42,400
Other $0
Other $0
Other $100,000
Other $0 $0
Other
$0 Other
$0 $0
Total $559,000
Total $229,000
Total $500,000
Total $144,000 $136,000 Total
$4,536,000 Total $3,000 $212,000
Page 203 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Jeff Davis
Project: 533175. Type Work: Replace Bridge
Descp: SR 135/US 221 @ TOWN CREEK 2.9 MILES SOUTH
OF DENTON
Length: 0.45
TlP#:
Project: 533176- Type Work: Replace Bridge Descp: SR 135/US 221 @WHITEHEADCREEK 1 MILE
NORTH OF DENTON Length: 0.87
TlP#:
Project: 533177. Type Work: Replace Bridge
Descp: SR 135/US 221 @ HURRICANE CREEK 6.8 MI SW
OF HAZELHURST
Length: 0.57
TlP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006
Federal $11.200
$1.137,600
Federal $10,400
$1.266,400
Federal $10,400
$1.126,400
State $2.800
$284,400
State $2.600
$316,600
State $2,600
$281,600
Other
$0
$0
Other $0
$0 Other $0 $0
Total $14,000 $1,422,000
Total $13.000
$1.583.000
Total $13.000 $1.408,000
Page 204 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2nt2QQ5
Jefferson
PrOject: 0002341 Type Work: Slreetscapes Descp: WRENS STREETSCAPE PROJECT
LUMP SUM PROJECT
Length: 000 TlP#:
Project: 0006637 Type Work: Streetscapes Descp: DOWNTOWN GATEWAY
IMPROVEMENTS-STREETSCAPE, CROSSWALK Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 222500- Type Work: Widening
Descp: SR 4/US 1 FM CR 104 TO US 1/SR 4 BUS NEAR
WADLEY & JEFFERSON
Lanes: Exist. 2 Prop. 4
Length: 7.10
TlP#:
Project: 231230- Type Work: Passing Lanes
Descp: SR 24/US 221 EB MP 12.6-13.8;WB 10.0-11.3;EB
3.2-4.3
Lanes: Exist. 2 Prop. 3
Length: 3.60
TlP#:
Project: 231260- Type Work: Passing Lanes
Descp: SR 24 PASSING LNS @ 4 LOC BET
WA YNESBORO&LOU'VILLE/JEFFERSON
Lanes: Exist. 2 Prop. 3
Length: 5.28
TlP#:
Project: 232281- Type Work: Replace Bridge Descp: SR 4 BUS- US 1 BUS @ WILLIAMSON SWAMP
CREEK IN WADLEY Length: 0.22
TlP#:
Project: 245390- Type Work: Replace Bridge Descp: SR 17@ BIG CREEK 3 MI SE OF LOUISVILLE
Length: 0.28 TlP#:
Phase Fund CST STP
Year LUMP
Federal $700,000
State $0
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase Fund
PE
Stale
PE
Bond
ROW Bond
CST Slate
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2005 After 2007
Year Underway
2005 2006
Federat
State
$0
$1,407,000
Federal
$40,000 $2,166,400
State
$10,000 $541,600
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2006
Federal
$436,000 $1,995,200
State
$109,000 $498,800
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006 2006
Year Underway Underway
2005
Federal
$10,400 $1,430,400
$272,000 Federal
$1,096.800
State $2,600
$357,600 $68,000 State
$274,200
Other $175,000
Other $125,000
Other
$0 Other
$0 $0 Other $0 $0 Other $0 $0 $0 Other
$0
Total $875,000
Total $625,000
Total
$1,407.000
Total $50,000 $2.708,000
Total $545,000 $2.494,000
Total $13,000 $1,788,000 $340,000 Total
$1,371.000
Page 205 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005
Jenkins
Project: 0006319 Type Work: Replace Bridge Descp: CR 20010LD SAVANNAH ROAD @ SCULLS CREEK
Length: 0.40 T1P#:
Project: 0006638 Type Work: Streetscapes
Descp: COTION AVENUE STREETS CAPE & GREENSPACE PRESERVATION Length: 0.64
LUMP SUM PROJECT
T1P#:
Project: 222540-
Type Work: Widening
Descp: SR 23/SR 121/US 25 SAV RV PKWY FM SR 67 TO
SR 21 & BR [EXC]
Lanes: Exist. 2 Prop. 4
Length: 6.23
TIP#:
Project: 222545-
Type Work: Bridge Rehab
Descp: SR 121/US 25 WIDEN UTILE BUCKHEAD CREEK
BRIDGE
Lanes: Exist. 2 Prop. 4
Length: 0.27
T1P#:
Project: 245365-
Type Work: Replace Bridge
Descp: SR 23@ BEAVERDAM CREEK 11.7 MI NE OF
MILLEN
Length: 0.61
TIP#:
Phase Fund PE Bridge ROW Bridge CST Bridge
Year 2005 2006 After 2007
Phase Fund CST STP
Year LUMP
Federal $40,000 $40,000
Federal $500,000
State $10,000 $10,000
State $0
Phase Fund PE State ROW Bond ROW RRBS CST RRBS
Phase Fund PE Bridge CST Bridge
Year Underway Underway
2005 2006
Year Underway
2006
Federal
State
$0 $0
Federal
$8,135,000 $11,563,000
State
$624,000
$156,000
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 2006
Federal
$16,000 $1,081,600
Slate
$4,000 $270,400
Other $0 $0
Other $125,000
Other
$0 $0 Other $0
Other $0 $0
Total
$50,000
$50,000
Total
$625,000
Total $8,135,000
$11,563,000
Total
$780,000 Total $20,000 $1,352,000
Page206of300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2flI2QQ5
Johnson
Project: 0006557 Type Work: Bicycle/Ped. Facility
Descp: WRIGHTSVILLE PEDESTRIAN FACILITIES - PHASE II Length: 0.00
LUMP SUM PROJECT
T/P#:
Project: 0006668 Type Work: Park & Ride Lot Descp: SR 31/US 319 @ CR 243/IVEY CHAPEL ROAD -
PARK & RIDE LOT Length: 0.38
T/P#:
Project: 222190- Type Work: Passing Lanes
Descp: SR 15 AT 3 LOC BTWN WRIGHTSVILLE &
TENNILLE/& WASHINGTON
Lanes: EXist. 2 Prop. 3
Length: 4.03
T/P#:
Phase Fund CST STP
Year LUMP
Phase Fund
PE
NHS
CST NHS
Year 2005 2005
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 After 2007
Federal $400,000
State $0
Federal $1.600
$12.800
State $400
$3.200
Federal $92.800
State $23,200
Other $100,000
Other $0 $0
Other $0
Total $500,000
Total $2.000
$16.000
Total $116,000
Page 207 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/712005
Jones
Project: 0001040 Type Work: Widening
Descp: SR 44 FM GRAY BYPASS TO CR 104/MATHIS
ROAD Lanes: Exist. 2
Prop. 4
Length: 10.89
T/P#:
Project: 0006492 Type Work: Striping
Descp: SIGNAGE & STRIPING @ VARIOUS RAIL CROSSINGS IN BIBB & JONES Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 231620- Type Work: Widening
Descp: SR 44 FM MATHIS ROAD/JONES TO US
441IPUTNAM
Lanes: Exist. 2 Prop. 3
Length: 10.73
T1P#:
Project: 333100- Type Work: Miscellaneous Improvement Descp: SR 22iUS 129 FM STEWART ST TO MADISON
ST-DRAINAGE IMPRVMNTS Length: 0.31
T1P#:
Project: 343400- Type Work: Replace Bridge Descp: SR 18 @ WALNUT CREEK 6 MI W OF GRAY
Length: 0.47 T1P#:
Phase Fund PE STP ROW STP CST STP
Phase Fund PE STP CST STP
Phase PE ROW CST
Fund STP STP STP
Phase PE ROW CST
Fund STP STP STP
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year 2007 After 2007 After 2007
Year Underway
LUMP
Year Underway
2006 After 2007
Year Underway
2005 2005
Year Underway Underway
2005
Federat $2,662,400
State $665,600
Federal $48,000
State $0
Federal $4,992.800
State $1,248,200
Federal $217,600 $415,200
Federal
State $54,400 $103,800
State
$999,200
$249,800
Other $0
Other $0
Other $0
Other $0 $0
Other
$0
Totat $3,328,000
Totat $48.000 Total $6,241.000 Totat $272,000 $519.000 Total $1,249,000
Page 208 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Lamar
Project: 0004590 Type Work: Water Pollution Mitig.
Descp: 889 STREAM CREDITS FOR PI 322530-/STP-0001-3(31 )SPUR Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 321370. Type Work: Passing Lanes
Descp: SR 18 SB 13.7-15.2IMONROE/EB 2.3-3.6IWB
3.38-5.1ITL 5.10-5.6 Lanes: Exist. 2 Prop. 3
Length: 4.80
TlP#:
Project: 322530. Type Work: New Construction
Descp: BARNESVILLE BYP [TRUCK BYPJ FM SR 7/US 341
N. TO SR 18/US41 Lanes: Exist. 0 Prop. 2
Length: 1.90
TlP#:
Project: 333140. Type Work: Replace Bridge
Descp: SR 18@POTATOCREEK4 MI W OF
BARNESVILLE
Length: 0.27
TIP#:
Project: 343390- Type Work: Replace Bridge Descp: SR 36 @ EDIE CREEK 6 MI N OF BARNESVILLE
Length: 0.22 TIP#:
Project: 343391. Type Work: Replace Bridge Descp: SR 36 @ BUCK CREEK 9.5 MI N OF BARNESVILLE
Length: 0.44 TlP#:
Phase Fund ROW STP
Year LUMP
Federal $28,800
State $7,200
Phase PE ROW CST
Fund STP STP STP
Year Underway
2005 After 2007
Federal $192,000
Phase PE ROW CST
Fund STP STP STP
Year Underway Underway
2005
Federal $2,139,200
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 2007
Federal
$11,200 $815,200
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 2007
Federal
$11,200 $880,000
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2007
Federal
$27,200 $2,320,000
State $48,000
State
$534,800
State $2,800
$203,800
State $2,800
$220,000
State $6,800
$580,000
Other $0
Total $36,000
Other $0
Total $240,000
Other
Total
$0
Other $0 $0
Other $0 $0
Other $0 $0
$2,674,000
Total $14,000
$1,019,000
Total $14,000 $1,100,000
Total $34,000 $2,900,000
Page 209 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM wa005
Lanier
Project: 0000310 Type Work: Intersection Improvement
Descp: SR 31!US 221 @ SR 37 & SR 11/US 129 EAST OF
LAKELAND Lanes: Exist. 2 Prop. 3
Length: 0.32
LUMP SUM PROJECT
TlP#:
Project: 442920. Type Work: Replace Bridge
Descp: SR 64/SR 168 @ ALAPAHA RIVER & OVERFLOW @
BERRIEN/LANIER LN
Length: 1.08
TIP#:
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Year Underway Underway
2006 2006
Federal $27.200
$1.312.800
Federal
$2.960.800 $299,200
State $6,800
$328.200
State
$740.200 $74.800
Other
$0
$0 Other
Total $34.000 $1.641.000
Total
$0
$3.701.000
$0
$374.000
Page 210 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aJ2QQ5
Laurens
Project: 0000542 Type Work: Widening Descp: SR 257 FROM 1-16TO INDUSTRIAL BLVD
Lanes: Exisl. 2 Prop. 4
Length: 2.86 TlP#:
Project: 0005923 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCATIONS IN LAURENS CO Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006476 Type Work: Guardrail
Descp: SR 117 FM EASTMAN CITY TO SR 29/US 441 S OF
DUBLIN @ 17 LOCS
Length: 20.74
LUMP SUM PROJECT
TlP#:
Project: 0006558 Type Work: Streetscapes Descp: DUBLIN PATHWAY & ENHANCEMENT
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 210940- Type Work: Interchange Descp: 1-16SAFETY UPGRADES @ SR 338, SR 257 & SR
19 Length: 1.20
TlP#:
Project: 232270- Type Work: Replace Bridge
Descp: SR 26/US 80 @ PUGHES CREEK 2.8 MI SE OF
BREWTON
Length: 0.22
TlP#:
Project: 245395- Type Work: Replace Bridge
Descp: SR 19@ WHITEWATER CREEK 13.2 MI SE OF
DUBLIN
Length: 0.20
TlP#:
Project: 245396- Type Work: Replace Bridge Descp: SR 19 @ BIG FLAT CREEK 13 MI SE OF DUBLIN
Length: 0.25 TlP#:
Project: 245397-
Type Work: Replace Bridge
Descp: SR 19@ LITTLE FLAT CREEK 12.5 MI SE OF
DUBLIN
Length: 0.31
TlP#:
Project: 245398 Type Work: Replace Bridge
Descp: SR 199 @ PUGHES CREEK 6.9 MI SE OF EAST
DUBLIN
Length: 0.27
TlP#:
Project: 262040- Type Work: New Construction
Descp: DUBLIN BYP FM US 441 @.5 MI N OF FIRE TOWER
RD NW TO US 441 Lanes: Exist. 0 Prop. 4
Length: 8.74
TlP#:
Phase Fund
PE
STP
ROW State
ROW STP
CST STP
Phase Fund CST STP
Year Underway Underway Underway
2005
Year LUMP
Federal
State
$4,653,600
Federal $480,000
$1,163,400
State $120,000
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund CST STP
Year LUMP
Federal
$90,000 $675,000
Federal $500,000
State
$10,000 $75,000
State $0
Phase Fund
PE
1M
CST 1M
Year Underway
2005
Federal $5,268,600
State $585,400
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2007
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Phase Fund
PE
Bridge
ROW STP
CST Bridge
Year Underway Underway
2005
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Phase Fund
PE
State
ROW Bond
ROW State
ROW Bond
ROW State
CST Bond
Year Underway
2005 Underway
2005 Underway
2007
Federal
State
$916,000 Federal
$229,000 State
$867,471 Federal
$216,868 State
$884,000 Federal
$221,000 State
$888,000 Federal
$222,000 State
$1,128,800
$282,200
Federal
State
$0
$4,230,000
$0
$6,788,000
$0 $29,076,000
Other
Total
$0
Other $0
$5,817,000
Total $600,000
Other
$0 $0
Other $125,000
Total
$100,000 $750,000
Total $625,000
Other $0
Total $5,854,000
Other
Total
$0 Other
$1,145,000 Total
$0 Other
$1,084,339 Total
$0 Other
$1,105,000 Total
$0 Other
$1,110,000 Total
$0
$1,411,000
Other $0 $0 $0
Total $4,230,000 $6,788,000 $29,076,000 Page 211 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Laurens
Project: MOO2704 Type Work: Rest Area Descp: 1-16 DUBLIN REST AREAS WATER AND SEWER
SERVICE IN LAURENS CO Length: 0.80
LUMP SUM PROJECT
TlP#:
Project: MOO2901 Type Work: Resurface & Maintenance
Descp: SR 257 FM SR 126 IN DODGE TO CR 318/RAIL
ROAD ST IN LAURENS
Length: 6.67
LUMP SUM PROJECT
TlP#:
Phase Fund
PE
1M
CST 1M
Year Underway
LUMP
Phase Fund CST STP
Year LUMP
Federal $3,397,500
Federal $547,200
State $377,500
State $136,800
Other $0
Total $3,775,000
Other
$0
Total $684,000
Page212of300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Lee
Project: 0000666 Type Work: Railroad Crossing
Descp: EASTWEST CONN IN LEESBURG @ NS
#TEMP177
Length: 0040
LUMP SUM PROJECT
TIP#:
Project: 0001420 Type Work: New Construction
Descp: LEESBURG NORTH BYPASS/SR RELOC FM SR
3/US 19 EAST TO SR 195
Lanes: Exist. 0 Prop. 2
Length: 5.90
TIP#: H/R-99-l3
Project: 431730. Type Work: Widening
Descp: SR 91/PHILEMA RD FM CR 5/GRAVES SPGS RD
NE TO SR 32 Lanes: Exist. 2 Prop. 4
Length: 5.94
TIP#: H/R-99-l2
Project: 432090. Type Work: Replace Bridge Descp: SR 32 @ MUCKALEE CREEK APP 2.5 Ml E OF
LEESBURG Length: 0.69
TlP#: SRl
Project: 432092. Type Work: Replace Bridge Descp: SR 32@ FLINT RIVER AND OVERFLOW AT THE
LEEIWORTH COUNTY LN. Length: 1.17
TlP#: OR-3
Project: 462395. Type Work: Widening
Descp: SR 3/US 19 FM NORTH OF CR 151 NW TO SUMTER
CL @ SMITHVILLE
Lanes: Exist. 2 Prop. 4
Length: 8.98
TlP#:
Project: T001285 Type Work: Transit Projects Descp: Leesburg Train Depot Rennovation and Restoration
Length: 0.00 TIP#:
Phase Fund CST STP
Year LUMP
Federal $100,000
State $0
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Federal $160,000
State $40,000
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Federal $1,040,000
State $260,000
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway
2005
Federal $2,217,600
State $554,400
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 2005
Phase PE ROW ROW CST
Fund State E02 RRBS RRBS
Phase Fund CST Transit
Year Underway Underway Underway
2007
Year 2005
Federal
$45,600 $4,904,000
State
$11,400 $1,226,000
Federal
State
$0
Federal $294,678
$19,856,000
State $0
Other $0
Total $100,000
Other $0
Total $200,000
Other $0
Total $1,300,000
Other
Total
$0
Other $0 $0
Other
$2,772,000
Total $57,000 $6,130,000
Total
$0
Other $73.669
$19,856,000
Total $368,347
Page 213 of 300
STATE TRANSPORTA nON IMPROVEMENT PROGRAM Za12QQ5
Liberty
Project: 0000455 Type Work: Descp: SR 38IUS 84 AT SR 196
Intersection Improvement
Length: 0.83 TlP#:
Project: 0004917 Type Work: Widening
Descp: SR 119/AIRPORT ROAD FROM US 84 TO SR 196 IN
HINESVILLE
Lanes: Exist. 2 Prop. 4
Length: 3.24
TlP#:
Project: 0006484 Type Work: Railroad Crossing Descp: CR 39/ROGERS PASTURE ROAD @ CSX #637342M
LUMP SUM PROJECT
Length: 0.40 TlP#:
Project: 520781. Type Work: Widening Descp: SR 196 FM US84/SR 38 TO SR 25/US 17 SW OF 1-95
Lanes: Exist. 2 Prop. 4
Length: 8.73 TlP#:
Project: 521190. Type Work: Replace Bridge Descp: SR 196@ BAKER SWAMP SLOUGH
Lanes: Exist. 2 Prop. 5
Length: 0.32 TlP#:
Project: 522570. Type Work: New Construction
Descp: US 84 CONN FM 1 MI S SR 196/US84 INT TO US 84
S FLEMINGTON
Lanes: Exist. 0 Prop. 4
Length: 3.70
TlP#:
Project: 532600. Type Work: Passing Lanes
Descp: SR 144 PASSING LANES THROUGH FT
STEWART/BRYAN-LIBERTY
Lanes: Exist. 2 Prop. 3
Length: 5.01
TlP#:
Phase Fund PE NHS ROW NHS CST STP
Year Underway Underway
2005
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway
2006
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway
2006
Phase Fund PE NHS ROW NHS CST NHS
Year Underway
2006 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
2006 After 2007
Federal
State
$921,600
Federal $4,000
$230,400
State $1,000
Federal $140,000
State $0
Federal
State
$9,919,200 $2,479,800
Federal
State
$1,164,000 Federal $864,800
$291,000 State $216,200
Federal $763,200
State $190,800
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Total
$1.152.000
Total $5,000
Total
$140,000
Total
$12,399,000 Total
$1,455,000 Total
$1.081,000
Total
$954,000
Page 214 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM ZmZQQ5
Lincoln
Project: 0000759 Type Work: Realignment Descp: SR 79 RELOCATION USING CR 278 FM SR 43 TO
SR 79 & BR Length: 2.00
T1P#:
Project: 0001370 Type Work: Replace Bridge
Descp: SR 43/US 378 @ SAVANNAH RIVER 6.8 MI E OF
LINCOLNTON @ S.C.
Length: 0.60
T1P#:
Project: 0004454 Type Work: Intersection Improvement
Descp: SR 47 AT CS 514/ELAM HEIGHTS & LILLIAN SIMS
IN LINCOLNTON CL
Length: 0.11
LUMP SUM PROJECT
T1P#:
Project: 231360. Type Work: Passing Lanes
Descp: SR 47 FM SR 43 CONN TO .5 NW OF CR 80 - TWO
PASSING LANES Lanes: Exist. 2 Prop. 3
Length: 1.52
TIP#:
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 2007
Federal $385,600
Federal $8,000
Federal $1,710
$124,200 Federal
$88,000 $1,540,800
State $96,400
State $2,000
State $190
$13,800
State $22,000 $385,200
Other $0
Other $0
Other $0 $0
Other $0 $0
Total $482,000
Total $10,000
Total $1,900
$138,000 Total $110,000 $1,926,000
Page 215 of 300
STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM 2t7I2QQ5
Long
Project: 532600-
Type Work: Passing Lanes
Descp: SR 144 PASSING LANES THROUGH FT
STEWART/BRYAN-LIBERTY
Lanes: Exist. 2 Prop. 3
Length: 5.01
TlP#:
Phase PE ROW CST
Fund STP STP STP
Year Underway
2006 After 2007
Federal $763,200
State $190,800
Other $0
Total $954,000
Page216of300
.e',
STATE TRANSPORTATION IMPROVEMENT PROGRAM WaDD5
Lowndes
Project: 0000083 Type Work: Bicycle/Ped. Facility Descp: VALDOSTA MULTI-USE TRAIL
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0000684 Type Work: Replace Bridge
Descp: CS 1191ITUCKER ROAD @ DUKES BAY CANAL IN
SOUTH VALDOSTA
Length: 0.21
TlP#:
Project: 0000762 Type Work: Widening
Descp: 1-75FM NORTH OF SR 133 TO COOK COUNTY
LINE - PHASE 2 Lanes: Exist. 4 Prop. 6
Length: 13.40
TIP#:
Project: 0000837 Type Work: Widening
Descp: JERRY JONES RD/CR 784 FROM GORNTO RD TO
JADAN PLACE Lanes: Exist. 2 Prop. 4
Length: 1.66
TlP#:
Project: 0001566 Type Work: Turn Lanes Descp: SR 38/US 84 MEDIAN TURN LANES FROM
VALDOSTA TO LANIER CO Length: 13.03
TIP#:
Project: 0003896 Type Work: Landscaping Descp: 1-75 INTERSTATE GATEWAY LANDSCAPING
LUMP SUM PROJECT
Length: 1.00 TlP#:
Project: 0005950 Type Work: Turn Lanes
Descp: SR 125@CR 784/NORTHSIDE DR & SR 133@ CR 4851RIVER ST Length: 1.09
LUMP SUM PROJECT
TlP#:
Project: 0006440 Type Work: Intersection Improvement Descp: SR 1024/INNER PERIMETER RD @ SR 94
LUMP SUM PROJECT
Length: 0.80 TIP#:
Project: 422710- Type Work: Bridges
Descp: SR 38/US 84/W. HILL AVE GRADE SEPARATION AT
NORFOLK SOU. RR
Length: 0.32
TIP#:
Project: 431480-
Type Work: Widening
Descp: CR 868 (OLD US 41) FM SR 7/N VALDOSTA RD TO
SR 122 Lanes: Exist. 2
Prop. 4
Length: 7.33
TIP#:
Project: 432100-
Type Work: Replace Bridge
Descp: SR 31 AT WITHLACOOCHEE RIVER AT THE
GA-FLA STATE LINE
Length: 0.33
TlP#:
Phase PE ROW CST
Fund Local Local STP
Year LOCL LOCL LUMP
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2007
Phase Fund PE NHS ROW NHS CST Bond
Year 2005 2007 After 2007
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2006
Phase Fund PE NHS CST NHS
Year Underway
2007
Phase Fund CST STP
Year LUMP
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase PE ROW CST
Fund STP STP STP
Year Underway
LUMP LUMP
Phase Fund PE STP ROW STP CST STP
Year Underway
2006 2007
Phase PE ROW CST
Fund STP STP STP
Year Underway
2006 After 2007
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2006
Federal $0 $0
$759,200
State $0 $0 $0
Other $0 $0
$189,800
Federal
$0 $208,000
State
$0 $52,000
Other
$0 $0
Federal $2,400,000 $9,273,600
State $600,000 $2,318,400
Other $0 $0
Federal
$0 $1,400.000
State
$0 $350.000
Federal $4,644.800
State $1,161.200
Other $0 $0
Other $0
Federal $1.000.000
State $250,000
Other $0
Federal
$64.800 $1,269,000
State
$7.200 $141,000
Federal
$13.500 $225,000
State
$1,500 $25,000
Federal
$2,150,400 $5,504.800
State
$537,600 $1.376,200
Federal $1,986,400
State $496,600
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Federal
$35,200 $2,147.200
State
Other
$8,800 $536,800
$0 $1,660,000
Total $0 $0
$949,000
Total $0
$260,000
Total $3.000.000 $11,592,000
Total $0
$1.750,000
Total $5,806,000
Total $1.250.000
Total $72.000
$1,410.000
Total $15.000
$250.000
Total $2.688.000 $6.881.000
Total $2,483.000
Total $44.000
$4.344.000
Page 217 of 300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM zal2QQ5
Lowndes
Project: 432150- Type Work: Replace Bridge Descp: SR 122@MEETINGHOUSE CK & LITTLE RIVER
BROOKS-LOWNDES CO LN Length: 1.09
TIP#:
Project: 442645- Type Work: Replace Bridge
Descp: CR 781/STATEN ROAD @WITHLACOOCHEE
RIVER
Length: 0.20
TlP#:
Project: 442960- Type Work: Replace Bridge
Descp: SR 122@WITHLACOOCHEE RIVER APP 4.5 MI E
OF HAHIRA
Length: 0.81
TIP#:
Project: 450200- Type Work: Widening
Descp: N. FORREST ST IN VALDOSTA FM PARK AVE/SR
31 TO BEMISS ROAD Lanes: Exist. 2 Prop. 5
Length: 3.20
TlP#:
Project: 450510- Type Work: Widening
Descp: N OAK ST EXT/MT ZION CH RD FM SR 7/N
VALDOSTA TO FORREST ST
Lanes: Exist. 2 Prop. 4
Length: 2.47
TIP#:
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 2006
Federal
$37,600 $5,304,800
State
$9,400 $1,326,200
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2006
Federal
$0 $2,180,800
State
$0 $545,200
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Federal $2,267,200
State $566,800
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2006
Federal
$0 $5,268,000
State
$0 $1,317,000
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2007
Federal
$0 $4,320,000
State
$0 $1,080,000
Other $0 $0
Other $10,000
$0
Other
$0
Other $0 $0
Other $0 $0
Total
$47,000
$6,631,000
Total $10,000 $2,726,000
Total $2,834,000
Total
$0
$6,585,000
Total
$0
$5,400,000
Page 218 of300
...'''
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Lumpkin
Project: 0000565 Type Work: Replace Bridge
Descp: AURARIA ROADICR 226 OVER CROOKED CREEK
SE OF DAHLONEGA
Length: 0.22
TIP#:
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2007
Federal
$0 $554,400
State
$0 $138,600
Other
$0 $0
Total
$0 $693,000
Page 219 of 300
STATE TRANSPORTA nON IMPROVEMENT PROGRAM 21712005
Macon
Project: 322285- Type Work: Replace Bridge Descp: SR 90 @ CSX RR SOUTH OF IDEAL NEAR CR 57
Length: 0.90 TlP#:
Project: 333070. Type Work: Intersection Improvement Descp: SR 128 @SR 90 & SR 127; SR 26 @ SR 49 & SR
224 & SIGNING Length: 2.60
TlP#:
Project: 343340. Type Work: Replace Bridge Descp: SR 240 @ BUCK CREEK APP 5 MI S OF IDEAL
Length: 0.66 TlP#:
Project: 343350. Type Work: Replace Bridge
Descp: SR 329 @ HOGCRAWL CREEK 7.0 MILES E OF
MONTEZUMA
Length: 0.57
TlP#:
Phase Fund ROW Bridge CST Bridge
Year 2005 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 After 2007
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 After 2007
Federal $30,400
Federal $162,000
Federal $24,000
Federal $16,000
State $7,600
State $40,500
State $6,000
State $4,000
Other
$0
Total $38,000
Other
$0
Total $202,500
Other
$0
Total $30,000
Other
$0
Total $20,000
Page220of300
'..~e''
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I2005
Madison
Project: 0001047 Type Work: Passing Lanes
Descp: SR 98 PASSING LANES AT 2 LOCATIONS
BETWEEN SR 8 AND SR 172
Lanes: Exist. 2 Prop. 3
Length: 2.45
TlP#:
Project: 0001583 Type Work: Turn Lanes
Descp: SR 8/US 29 MED TN LNS FM NE OF ATHENS TO
OLD SR 106IMADISON
Length: 3.66
TlP#: R-75
Project: 0005531 Type Work: Replace Bridge
Descp: SR 191 @ SCULL SHOAL CREEK 4 MILES NE OF
DANIELSVILLE
Length: 0.20
TlP#:
Project: 122100. Type Work: Widening
Descp: SR 72 FM EAST OF SR 172 TO THE WEST CITY
LIMITS OF COMER Lanes: Exist. 2 Prop. 4
Length: 2.93
TlP#:
Project: 142280. Type Work: Replace Bridge
Descp: SR 172 @ SOUTH FORK BROAD RIVER 2.5 MI W
OF COMER
Length: 0.19
TlP#:
Phase PE ROW CST
Fund STP STP STP
Year 2007 After 2007 After 2007
Phase Fund
PE
STP
CST STP
Year Underway
2006
Federal $120,000
State $30,000
Federal $4,048,000
State $1,012,000
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2007 After 2007
Phase PE PE ROW CST
Fund Slate Bond Bond Bond
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2006 After 2007
Year Underway Underway
2005
Federal $40,000
State $10,000
Federal
State
$0
$7,100,000
Federal
State
$769,600
$192,400
Other $0
Other $0
Other $0
Other $0
Other $0
Total $150,000
Total $5,060,000
Total $50,000
Total $7,100,000
Total $962,000
Page 221 of 300
STATE TRANSPOR TATION IMPROVEMENT PROGRAM
ZmZQQ5
Marion
Project: 0006559 Type Work: Sidewalks Descp: BUENA VISTA SIDEWALK PROJECT
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 343356. Type Work: Replace Bridge Descp: SR 137@ BUCK & GIN CREEKS WEST OF
TAZEWELL CITY LIMITS Length: 0.95
TIP#:
Phase Fund CST STP
Year LUMP
Federal $72.800
State $0
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 After 2007
Federal $32.000
Slate $8,000
Other
$18,200
Total $91.000
Other $0
Total $40.000
Page222of300
''.....''''
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zaJ2005
McDuffie
Project: 0000766 Type Work: Interchange
Descp: 1-20UPGRADES @ SR 47;SR388/COLUMIA & SR
150IMCDUFFIE
Length: 7.02
TlP#: 1M -4
Project: 0001999 Type Work: Intersection Improvement
Descp: SR 10/US 78fTHOMSON EAST BYPASS AT SR
223/WHITE OAK RD
Length: 0.80
LUMP SUM PROJECT
TlP#:
Project: 0004291 Type Work: Median Work Descp: SR 10/17 FM CR 26IDALLAS DR TO CR
308IHARRISON RD-ADD MEDIAN Length: 168
TlP#:
Project: 0006315 Type Work: Water Pollution Mitig.
Descp: 99.95 WETLAND CREDITS TO MITIGATE PI#
262400- MCDUFFIE CO
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006420 Type Work: Barriers
Descp: 1-20FM SR 80 TO RICHMOND COUNTY - CABLE
MEDIAN BARRIERS
Length: 29.52
LUMP SUM PROJECT
TlP#:
Project: 0006607 Type Work: Streetscapes Descp: DOWNTOWN WALKWAY REVITALIZATION PLAN
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 232320- Type Work: Replace Bridge
Descp: SR 47/US 221 @ HEADSTALL CREEK 5.3 MI S OF
DEARING
Length: 0.27
TlP#:
Project: 262400- Type Work: New Construction
Descp: THOMSON E BYP FM SR 17 @ CR 311 NE NEW
LOC TO SR 17 @ CR 20
Lanes: Exist. 0 Prop. 4
Length: 7.50
TIP#:
Phase Fund CST 1M
Year 2005
Federal $10,260,000
State $1,140,000
Phase PE ROW CST
Fund STP STP STP
Year Underway
LUMP LUMP
Phase PE ROW CST
Fund STP STP STP
Year 2007 After 2007 After 2007
Phase Fund ROW STP
Year LUMP
Federal
$22,500 $572,400
Federal $256,000
State
$2,500 $63,600
State $64,000
Federal $160,000
State $40,000
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $2,104,200
State $233,800
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2007
Phase Fund
PE
State
ROW State
ROW RRBS
CST RRBS
Year Underway Underway Underway
2006
Federal
State
$997,600 Federal
$249,400 State
$0 $26,213,000
Other $0
Other $0 $0
Other $0
Other $0
Other $0
Other $125,000
Other $0
Other
$0
Total $11,400,000
Total $25,000 $636,000 Total $320,000
Total $200,000
Total $2,338,000
Total $625,000
Total $1,247,000
Total
$26,213,000
Page 223 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM wa005
McIntosh
Project: 0005949 Type Work: Multi-use Trail
Descp: SAPELO ISLAND WALKING TRAIL - MCINTOSH
COUNTY
Length: 0.11
LUMP SUM PROJECT
TIP#:
Project: 0006540 Type Work: Sidewalks Descp: DARIEN PEDESTRIAN CORRIDOR - PHASE III
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 511110. Type Work: Widening
Descp: 1-95 FM JUST N OF AL TAMAHA RIVER BR @
GLYNN COUNTY LN
Lanes: Exist. 4 Prop. 6
Length: 4.12
TlP#:
Project: 511120- Type Work: Widening
Descp: 1-95 FM 1-MILE NORTH OF SR 251 TO SR 57 --
PHASE 1
Lanes: Exist. 4 Prop. 6
Length: 941
TlP#:
Phase Fund CST STP
Year LUMP
Federal $214,400
State $0
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase Fund
PE
NHS
PE
NHS
CST Bond
Year Underway
2005 After 2007
Phase Fund
PE
NHS
PE
NHS
ROW NHS
CST Bond
Year Underway
2005 2006 2007
Federal $640,000
State $160,000
Federal
State
$480,000 $9,600 $0
$120,000 $2,400
$35,000,000
Other $53,600
Other $125,000
Other $0
Other $0 $0 $0
Total
$268,000
Total
$625,000
Total $800,000 Total
$600,000
$12,000
$35,000,000
Page 224 of 300
)'....'' ..''
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7/2005
Meriwether
Project: 0005532 Type Work: Replace Bridge
Descp: SR 851N MANCHESTER LOCATED @ CSX
RAILROAD
Length: 0.20
TtP#:
Project: 0006625 Type Work: Streetscapes
Descp: CITY OF MANCHESTER DOWNTOWN STREETSCAPEIMPROVEMENTPROGRAM Length: 0.00
LUMP SUM PROJECT
TtP#:
Project: 333180. Type Work: Replace Bridge
Descp: SR 85 SR 74 @ PAPPYS CREEK .5 MI N OF
WOODBURY
Length: 0.60
TtP#:
Project: 333181- Type Work: Replace Bridge
Descp: SR 85 SR 74 @ RED OAK CREEK 3.5 MI N OF
WOODBURY
Length: OAO
TIP#:
Project: 333182. Type Work: Replace Bridge
Descp: SR 85 SR 74 @ WHITE OAK CREEK A MI N OF
ALVATON
Length: 054
TtP#:
Project: 333184. Type Work: Replace Bridge
Descp: SR 85 AL T @ POUND CREEK 2 MI S OF
WOODBURY
Length: 0.22
TtP#:
Project: 333200 Type Work: Replace Bridge Descp: SR 85 @ CANE CREEK 1.7 MI S OF WOODBURY
Length: 0.24 TtP#:
Project: 333202 Type Work: Replace Bridge
Descp: SR 18IUS 27 ALT. @ KENDALL CREEK 2 MI S OF
GREENVILLE Lanes: Exist. 2 Prop. 3
Length: 0.38
TIP#:
Project: MOO0890 Type Work: Miscellaneous Improvement Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN
DISTRICT 3 Length: 0.00
LUMP SUM PROJECT
TtP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund ROW STP CST STP
Year 2005 2007 After 2007
Year LUMP
Year Underway Underway
2005
Year Underway
2005 After 2007
Year Underway Underway
2005
Year Underway Underway
2005
Year Underway
2005 2007
Year Underway Underway
2005
Year Underway
LUMP
Federal $80,000 $40,000
Federal $422,400
Federal
$1,461,600 Federal $9,600
Federal
$1,808,800 Federal
$1,015,200 Federal $24,000
$3,284,000 Federal
$1,278,400 Federal $236,000
State $20,000 $10,000
State $0
State
$365,400 State
$2,400
State
$452,200 State
$253,800 State
$6,000 $821,000 State
$319,600 State $59,000
Other $0 $0
Other $105,600
Other
$0 Other
$0
Other
$0 Other
$0 Other
$0 $0 Other
$0 Other
$0
Total $100,000
$50,000
Total $528,000
Total
$1,827,000 Total $12,000
Total
$2,261,000 Total
$1,269,000 Total $30,000
$4,105,000 Total
$1,598,000 Total $295,000
Page 225 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM WIZ005
Miller
Project: 0001381 Type Work: Replace Bridge Descp: SR 91 @ DRY CREEK 9.5 MI S OF COLQUITT
Length: 0.32 TIP#:
Project: 0005308 Type Work: Pavement Rehab Descp: OLD ALBANY RD FM SR 91 TO SR 45
Length: 2.70 TlP#:
Project: 0008543 Type Work: Sidewalks Descp: MILFORD STREET SIDEWALK PROJECT
LUMP SUM PROJECT
Length: 0.28 TIP#:
Project: 422210- Type Work: Widening
Descp: SR 1IUS 27 FR W CL @ COLQUITT TO CR
279/DAMASCUS-HILTON RD
Lanes: Exist. 2 Prop. 4
Length: 9.30
TlP#:
Project: 470880- Type Work: Replace Bridge Descp: CR 14 SOUTH OF BABCOCK @ BIG DRAIN CREEK
Length: 0,50 TlP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006
Phase PE ROW CST
Fund STP Local STP
Year 2007 LOCL After 2007
Phase Fund CST STP
Year LUMP
Phase Fund
PE
State
PE
Bond
ROW Bond
ROW Bond
CST Bond
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway Underway Underway
2005 2006 Year Underway LOCL 2007
Federal
$8,000 $788,800
Federal $108,000
$0
State
$2,000 $197.200
State $27,000
$0
Federal $224,000
State $0
Federal
State
$0 $0 Federal
$6,672,000 $11,562,000
State
$0 $132,800
$0 $33,200
Other $0 $0
Other $0
$6,000
Other $56.000
Other
$0 $0 Other $0 $0
Total
$10.000
$986.000
Total
$135,000 $6.000
Total
$280,000
Total $6.672.000
$11,562.000 Total $0 $166,000
Page 226 of 300
..-.-.0"''
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 2t7/2005
Mitchell
Project: 0001035 Type Work: Passing Lanes Descp: SR 93 FM CAIRO/GRADY CO TO
PELHAM/MITCHELL CO AT 3 LOCATIONS
Lanes: Exist. 2 Prop. 3
Length: 9.05
TlP#:
Project: 0003766 Type Work: Railroad Crossing Descp: SR 65/93 @ GFRN #637120D
LUMP SUM PROJECT
Length: 0.01 TIP#:
Project: 0004908 Type Work: Widening
Descp: SR 37 FROM EXISTING 4 LANE TO EAST OF SR 3
IN CAMILLA
Lanes: Exist. 2 Prop. 4
Length: 0.43
TlP#:
Project: 0004909 Type Work: Widening DfiSCP: SR 112 FROM SR 97 TO SR 31N CAMILLA
Lanes: Exist. 2 Prop. 4
Length: 1.84 TIP#:
Project: 0005293 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS AT VAR LOC ALONG
SR 38/US 84 & SR 93
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006544 Type Work: Streetscapes Descp: PELHAM STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006545 Type Work: Streetscapes Descp: CAMILLA EAST BROAD STREETS CAPE
IMPROVEMENTS Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006943 Type Work: Water Pollution Mitig. Descp: 95.21 ACRES OF WETLAND IN
MITCHELL-RACCOON CREEK MITIGATION Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 422690- Type Work: Bridge Rehab Descp: SR 3/US 19- SR 300 SBL @ WETHINGTON
SLOUGH S OF BACONTON Length: 0.22
TlP#:
Project: 422691- Type Work: Bridge Rehab
Descp: SR 3IUS 19- SR 300 SBL @ RACCOON CRK SOUTH
OF BACONTON
Length: 0.22
TlP#:
Project: 442740- Type Work: Replace Bridge
Descp: CR 307 AT BIG SLOUGH AND OVERFLOW IN
NORTH CAMILLA
Length: 0.52
TlP#:
Phase Fund PE STP ROW STP CST STP
Year 2007 After 2007 After 2007
Phase Fund
PE
STP
CST STP
Year LUMP LUMP
Federal $160,000
Federal $6,000
$175,000
State $40,000
State $0 $0
Phase Fund
PE
STP
ROW STP
CST STP
Year 2007 After 2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year 2007 After 2007 After 2007
Phase Fund ROW Local CST STP
Year LOCL LUMP
Federal $112,640
State $28,160
Federal $452,960
State $113,240
Federal $0
$398,400
State $0
$99,600
Phase Fund CST STP
Year LUMP
Federal $565,600
State $0
Phase Fund CST STP
Year LUMP
Federat $280,800
State $0
Phase Fund CST STP
Year LUMP
Federal $2,486,400
State $621,600
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2007 After 2007
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2007 After 2007
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2005
Federal $8,000
State $2,000
Federal $8,000
State $2,000
Federal
$0 $800,000
State
$0 $200,000
Other $0
Other $0 $0
Other $0
Other $0
Other $0 $0
Other $141,400
Other $70,200
Other $0
Other $0
Other $0
Other $50,000
$0
Total $200,000
Total $6,000
$175,000
Total $140,800
Total $566,200
Total $0
$498,000
Total $707,000
Total $351,000
Total $3,108,000
Total $10,000
Total $10,000
Total $50,000 $1,000,000
Page 227 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM ZmZQQ5
Monroe
Project: 0000685 Type Work: Replace Bridge Descp: CR 59/REEDY CREEK ROAD @ TOBESOFKEE
CREEK AND TRIBUTARY Length: 1.00
TIP#:
Project: 0006490 Type Work: Railroad Crossing Descp: CS 611/E. MAIN STREET@ NS #718334V
LUMP SUM PROJECT
Length: 020 TlP#:
Project: 0006696 Type Work: Streetscapes Descp: FORSYTH DOWNTOWN STREETS CAPES
Length: 0.00 TIP#:
Project: 321370. Type Work: Passing Lanes Descp: SR 18 SB 13.7-15.2IMONROE/EB 2.3-3.6IWB
3.38-5.1ITL 5.10-5.6 Lanes: Exist. 2 Prop. 3
Length: 4.80
TIP#:
Project: 343167. Type Work: Replace Bridge
Descp: SR 42 @ ECHECONNEE CREEK 6 MI E OF
CULLODEN
Length: 0.40
TIP#:
Project: 370813- Type Work: Replace Bridge
Descp: CR 158/ROCKY CREEK ROAD@ LITTLE
TOWALIGA RIVER W OF 1-75
Lanes: Exist. 1 Prop. 2
Length: 0.40
TlP#:
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2005
Phase Fund CST STP
Year LUMP
Federal
$0 $1,839,200
Federal $150,000
State
$0 $229,900
State $0
Phase Fund CST H170
Year 2005
Federal $750,000
State $0
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 After 2007
Federal $192,000
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Federal $1,600,000
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2005
Federal
$0 $1,180,000
State $48,000
State
$400,000 State
$0 $295,000
Other $10,000 $229,900 Other
$0
Other $0
Other $0
Other
$0 Other $10,000
$0
Total
$10,000
$2.299,000
Total
$150,000
Total
$750,000
Total
$240,000
Total
$2,000,000 Total
$10,000 $1,475,000
Page 228 of 300
.1
I..' ...,''
STATE TRANSPORTA TION IMPROVEMENT PROGRAM 2012005
Montgomery
Project: 0001366 Type Work: Replace Bridge Descp: SR 30lUS 280 @ OCONEE RIVER AT
WHEELERIMONTGOMERY CO LINE Length: 0.65
TIP#:
Project: 532330. Type Work: Replace Bridge Descp: CR 169fTHOMPSON POND ROAD @ TIGER CREEK
4 MI SE OF TARRYTOWN Length: 0.24
TlP#:
Project: 542410- Type Work: Replace Bridge
Descp: SR 56 @ MILLIGAN CREEK IN CITY LIMITS OF
UVALDA
Length: 0.23
TIP#:
Project: 550610-
Type Work: Turn Lanes
Descp: SR 292NIDALIA FM MORN'SIDE - LOWERY WITH
RIGHT ON WILSON Lanes: Exist. 2 Prop. 3
Length: 1.32
TIP#:
Project: 570760. Type Work: Replace Bridge Descp: CR 12@ TIGER CREEK 3 MI SE OF TARRYTOWN
Length: 0.22 TIP#:
Project: 571455. Type Work: Replace Bridge Descp: CR 1 @ TIGER CREEK 1 MI E OF TARRYTOWN
Length: 0.22 TlP#:
Project: M002617 Type Work: Resurface & Maintenance Descp: SR 292 FM SR 15 TO TOOMBS COUNTY LINE
LUMP SUM PROJECT
Length: 1.86 TIP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 After 2007
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2005
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2007
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2005
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2005
Phase Fund CST STP
Year LUMP
Federal $55,200
Federal $0
$692,000
Federal
$820,000
Federal $400,000 $2,432,000
Federal $0
$1,140,800
Federal $0
$680,000
Federal $96,000
State $13,800
State $0
$173,000
State
$205,000
State $100,000 $608,000
State $0
$285,200
State $0
$170,000
State $24,000
Other $0
Other $10,000
$0
Other
$0
Other $0 $0
Other $10,000
$0
Other $10,000
$0
Other $0
Total $69,000
Total $10.000 $865,000
Total
$1,025,000
Total $500,000 $3.040.000
Total $10,000 $1,426,000
Total $10.000 $850,000
Total $120,000
Page 229 of 300
STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM waDD5
Morgan
Project: 0002735 Type Work: Replace Bridge
Descp: CR 1161AQUA RD@ LITTLE INDIAN CREEK 5.7 MI
SO. OF MADISON
Length: 0.56
TlP#:
Project: 0006432 Type Work: Replace Bridge
Descp: CR 251/SEVEN ISLANDS RD @ BIG INDIAN CREEK
OVERFLOW
Length: 0040
TIP#:
Project: 0006433 Type Work: Replace Bridge Descp: CR 251/SEVEN ISLANDS RD @ BIG INDIAN CREEK
Length: 0040 TlP#:
Project: 222570. Type Work: Widening
Descp: SR 24IUS 441 FM THE PUTNAM CL TO N OF
PIERCE DAIRY RD/CR 121
Lanes: Exist. 2 Prop. 4
Length: 8.05
TIP#:
Project: 245400. Type Work: Replace Bridge
Descp: SR 83/BOSTWICK HWY @ LITTLE SANDY CRK 4.6
MI S OF BOSTWICK
Length: 0.57
TlP#:
Project: 245401- Type Work: Replace Bridge
Descp: SR 831B0STWICK HWY @ BIG SANDY CRK 3 MI
SO OF BOSTWICK
Length: 0.28
TlP#:
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2005
Phase PE ROW CST
Fund Bridge Local Bridge
Year 2005 LOCL After 2007
Phase PE ROW CST
Fund Bridge Local Bridge
Year 2005 LOCL After 2007
Phase Fund
PE State
PE
Bond
ROW Bond
ROW Bond
CST Bond
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2006 2007 After 2007 Year Underway 2006 2007
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 2007
Federal
$0 $814,400
Federal $28,000 $0
State
$0 $203,600
State $7,000 $0
Federal $36,800 $0
State $9,200 $0
Federal
State
$0 $0
Federal
$8.000 $792,000
$5,000,000 $6,797,000
State
$2,000 $198,000
Federal
$8.000 $840,000
State
$2,000 $210,000
Other $0 $0
Other $0
$50,000
Other $0
$50,000
Other
$0 $0 Other $0 $0
Other $0 $0
Total
$0
$1,018,000
Total $35,000
$50,000
Total
$46,000
$50,000
Total
$5,000,000
$6,797,000
Total $10,000 $990,000 Total $10,000
$1,050,000
Page 230 of 300
.'
STATE TRANSPORTATION IMPROVEMENT PROGRAM zmZOO5
Murray
Project: 0006616 Type Work: Historic Acquisition Descp: VAN HOUSE LAND ACQUISITION FOR HISTORIC
FEDERAL ROAD & TRAIL Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 621260- Type Work: New Construction
Descp: SR 282 RELOCATION FM SR 61/US 411 E TO CR
309
Lanes: Exist. 0 Prop. 2
Length: 1.20
TIP#:
Project: 631550- Type Work: New Construction
Descp: SR 225/SPRING PL BYP FM NEW HOPE RD TO SR
521US 76 -PHASE 1 Lanes: Exist. 0 Prop. 4
Length: 3.72
TlP#:
Project: 642410- Type Work: Replace Bridge
Descp: SR 282 @ ROCK CREEK 5.3 MI S OF
CHATSWORTH
Length: 0.22
TIP#:
Project: 871230- Type Work: Miscellaneous Improvement
Descp: RELOCATE CR 23; CONSTRUCT A CANOE/KAYAK RAMP & PARKING AREA Length: 0.23
LUMP SUM PROJECT
TIP#:
Phase Fund ROW STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase PE ROW CST
Fund STP STP STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase PE ROW CST
Fund STP STP STP
Year LUMP
Year Underway
2006 2007
Year Underway
2007 After 2007
Year Underway
2005 After 2007
Year Underway Underway
LUMP
Federal $600,000
Federal $472,800 $2,160,000 Federal $1,780,000
Federal $11,200
Federal
$172,000
State $0
State $118.200 $540,000 State $445.000
State $2,800
State $0
Other $150,000
Other $0 $0
Other $0
Other $0
Other
$43,000
Total $750,000
Total $591.000 $2.700.000 Total $2,225.000
Total $14,000
Total $215,000
Page 231 of 300
STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM zaJ2005
Muscogee
Project: 0000099 Type Work: Bicycle/Ped. Facility Descp: WARM SPRINGS RAIL LINE BIKE/PED TRAIL
LUMP SUM PROJECT
Length: 12.00 TIPII: DTR
Project: 0000342 Type Work: Widening
Descp: MACON RD/SR 22SP FM UNIVERSITY AVE/CS 959
TO REESE RD/CS2111
Length: 1.31
TlPII: 03-SR-2111
Project: 0001362 Type Work: Bridge Rehab
Descp: GENTIAN BLVD/CS 1781 @ LINDSEY CREEK JUST
EAST OF 1-185
Length: 0.20
TIPII: 00-SR-1362
Project: 0001607 Type Work: Intersection Improvement
Descp: SR 221US 80 AT BRADLEY PARK DRIVE/CS 1505 IN
COLUMBUS
Length: 0.46
LUMP SUM PROJECT
TlP#: Safe Lump
Project: 0001893 Type Work: Turn Lanes
Descp: SR 520 FROM 1-185/MUSCOGEE TO SR 26/MP
8.51/CHArrAHOOCHEE
Lanes: Exist. 4 Prop. 5
Length: 10.28
LUMP SUM PROJECT
TIP#: SafeLump
Project: 0002350 Type Work: Miscellaneous Improvement Descp: EAST BANK TO WEST BANK OF
CHATTAHOOCHEE RIVER Length: 0.00
LUMP SUM PROJECT
TIP#: Enhan
Project: 0002408 Type Work: Guardrail
Descp: LINDSAY CREEK PKWY FROM 1ST DIVISION RD/CHATT TO 1-185/MUSCG Length: 0.00
LUMP SUM PROJECT
TlP#: Safe Lump
Project: 0004729 Type Work: Replace Bridge
Descp: CS 2227/BROWN AVE. @ SOUTHERN RAILROAD
SW. COLUMBUS
Length: 0.25
TIP#: BR-4729
Project: 0006101 Type Work: Railroad Crossing Descp: CS 117218TH AVENUE @ NS #718961U
LUMP SUM PROJECT
Length: 0.20 TIP#:
Project: 0006446 Type Work: Widening
Descp: SR 1/US 27 FM TURNBERRY LN/MUSCOGEE TO
GATLIN LN/HARRIS
Lanes: Exist. 2 Prop. 4
Length: 6.26
TlP#: VET 2005
Project: 0006472 Type Work: New Construction
Descp: SCHATULGA RD/EASTERN CONN FRM RED
ARROW RD TO CHATHSWORTH RD
Lanes: Exist. 0 Prop. 2
Length: 1.16
TIP#: EAST2005
Phase Fund PE Local ROW Local CST STP
Phase Fund PE NHS ROW NHS CST NHS
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
STP
CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Phase Fund CST STP
Phase Fund PE STP ROW STP CST STP
Phase Fund ROW Local CST STP
Year LOCL LOCL LUMP
Year Underway
2006 After 2007
Year Underway
2005 2006
Year Underway
LUMP
Year LUMP
Year LUMP
Year LUMP
Year 2005 LOCL After 2007
Year LUMP
Year 2007 After 2007 After 2007
Year LOCL 2005
Federal $0 $0
$1,000,000 Federal $416,000
Federal $16,000
$258,400 Federal $367,200
Federal $1,991,700
Federal $1,000,000
Federal $819,000
Federal $184,000
$0
Federal $170,000
Federal $4,000
Federal $0
$3.200,000
State $0 $0 $0
State $104,000
State $4,000
$64,600 State $40,800
State $221,300
State $0
State $91,000
State $46,000
$0
State $0
State $1,000
State $0 $0
Other $0 $0
$250,000 Other $0
Other $0 $0
Other $0
Other $0
Other $250,000
Other $0
Other $0
$20,000
Other $0
Other $0
Other $214,000 $800,000
Total
$0
$0 $1,250,000 Total $520,000
Total
$20,000 $323,000 Total $408,000 Total $2,213,000
Total $1.250,000
Total $910,000 Total $230,000
$20,000
Total
$170,000 Total $5,000
Total
$214,000
$4,000,000
Page 232of 300
..:'
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Muscogee
Project: 0006597 Type Work: Streetscapes
Descp: VETERANS PARKWAY STREETSCAPE
IMPROVEMENTS
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006598 Type Work: Multi-use Trail
Descp: CHATTAHOOCHEE RIVERWALK BIBB MILL
CONNECTOR
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 311445. Type Work: Widening Descp: 1-185/COLUMBUS FM SR 520 TO ST MARYS ROAD
Lanes: Exist. 4 Prop. 6
Length: 2.83 TIP#: 91-ST-2003
Project: 311830. Type Work: Interchange Descp: 1-185 INTERCHANGE AT SR l/SR 520
Lanes: Exist, 2 Prop. 4
Length: 1.61 TIP#: 91-ST-~01
Project: 332820. Type Work: Widening
Descp: SR l/US 27 FM OLD MOON ROAD TO TURNBERRY
LANE Lanes: Exist. 2
Prop. 4
Length: 1.23
TIP#: 98-SR-01
Project: 350780. Type Work: Widening
Descp: FOREST RD FM MACON{+MACON IMPROV} TO
WOODRUFF FA/FLOYD RD
Lanes: Exist. 2 Prop. 4
Length: 2.14
TlP#: 79-SR-2003
Project: 350790. Type Work: Widening
Descp: ST MARYS RD/CS 2108/COLUMBUS FM BUENA
VISTA TO ROBIN DR
Lanes: Exist. 2 Prop. 4
Length: 0.91
TlP#: 79-SR-2020
Project: 350850 Type Work: Widening
Descp: SCHATULGA RD/EASTERN CONN. RD FM BUENA
VISTA RD TO MACON RD
Lanes: Exist. 2 Prop. 4
Length: 3.76
TlP#: 91-SR-2003
Project: 351000-
Type Work: Intersection Improvement
Descp: SR 22SP/MACON RDIWYNNTON AT BROWN
AVENUE AND PEACOCK AVENUE Length: 0.20
LUMP SUM PROJECT
TlP#: 79-SR-2004
Project: M002989 Type Work: Guardrail
Descp: 1-185 FM CS 22491WILlIAMS RD/MUSCOGEE TO
SR 1rrROUP
Length: 30.32
LUMP SUM PROJECT
TlP#:
project: TOO0855 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR COLUMBUS
Length: 0.00 TIP#:
Phase Fund CST STP
Year LUMP
Federal $1,000,000
State $0
Other $250,000
Phase Fund CST STP
Year LUMP
Federal $1,000,000
State $0
Other $250,000
Phase Fund
PE
NHS
ROW NHS
CST Bond
Year Underway
2005 2006
Federal
State
$320,000 $0
$80,000 $16,214,000
Other
$0 $0
Phase PE ROW CST
Fund 1M 1M Bond
Year Underway
2005 2006
Federal
$1,806,300 $0
State
$200,700 $8,245,000
Other
$0 $0
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2006
Federal
$2,544,000 $2,634,400
State
$636,000 $658,600
Other
$0 $0
Phase Fund
PE
STP
ROW STP
ROW STP
CST STP
CST STP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway Underway
2007 After 2007 After 2007
Year Underway
LOCL 2006
Federal
$11,680,000
Federal $0
$3,849,600
State
$2,920,000
State $0
$962,400
Other
$0
Other $0 $0
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL 2007
Federal
$0 $15,816,000
State
Other
$0
$214,000
$0 $3,954,000
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Federal
$0 $528,300
State
$0 $58,700
Other
$0 $0
Phase Fund
PE
1M
CST 1M
Year LUMP LUMP
Federal $1,800,000 $43,200,000
State $200,000 $4,800,000
Other $0 $0
Phase Fund CST Transit
Year 2005
Federal $889,568
State $111,196
Other $111,196
Total $1,250,000
Total $1,250,000
Total $400,000 $16,214,000
Total $2,007,000 $8,245,000
Total $3,180,000 $3,293,000
Total
$14,600,000
Total $0
$4,812,000
Total $214,000 $19,770,000
Total $0
$587,000
Total $2,000,000 $48,000,000
Total $1,111,960
Page 233 of 300
STATE TRANSPOR TATJON IMPROVEMENT PROGRAM
2t7I2QQ5
Muscogee
Project: T000656 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T000657 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T000919 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T000920 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T000921 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T001235 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T001236 Type Work: Transit Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR COLUMBUS
Length: 0.00 TIP#:
Project: T001237 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Phase Fund CST Transit
Year 2007
Federal $800,000
State $100,000
Federal $59,490
State $14.873
Federal $1,017,292
State $127,162
Federal $0
State $0
Federal $62,465
State $15.616
Federal $1,377.847
State $172,231
Federal $0
State $0
Federal $65.588
State $16,397
Other $100,000
Other $0
Other $127,162
Other $0
Other $0
Other $172.231
Other $0
Other $0
Total
$1.000.000
Total
$74.363
Total
$1.271,615
Total $0
Total
$78.081 Total $1,722,309
Total
$0
Total
$81,985
Page 234 of 300
.'
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM Za12005
Newton
Project: 0000842 Type Work: Intersection Improvement Descp: SR 1621SALEM ROAD AT CR 33/SPRING ROAD
LUMP SUM PROJECT
Length: 0.32 TIP#:
Project: 0004146 Type Work: Intersection Improvement
Descp: SR 81 AT CR 309/653 & SR 162 CONNECTOR; CR
574 PORTERDALE
Length: 0.53
LUMP SUM PROJECT
TlP#:
Project: 0004444 Type Work: Guardrail
Descp: SR 212 OVER LAKE JACKSON GUARDRAIL AT
APPROACHES
Length: 0040
LUMP SUM PROJECT
TlP#:
Project: 0004709 Type Work: Bicycle/Ped. Facility
Descp: YELLOW RIVER/BROWN'S BRIDGE ROAD
MULTI-USE TRAIL
Length: 5.00
LUMP SUM PROJECT
TlP#:
Project: 0006022 Type Work: New Construction
Descp: SR 11/1-20 RELOCATE CLOSE FRONTAGE RD-
RIVER RD EXTENSION Lanes: Exist. 0 Prop. 2
Length: 0.20
TlP#:
Project: 0006648 Type Work: Sidewalks Descp: PACE & ELM STREET SIDEWALK
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006649 Type Work: Historic Facilities Descp: HISTORIC TRAIN DEPOT-PORTERDALE'S TRAIL&
RIVERSIDE COMMUNITY Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 210530 Type Work: Interchange Descp: 1-20@ SR 142-121COVINGTON (INCL RELOC OF
FRONTAGE RD/CR 72) Length: 0.71
TIP#: NE-AR-OOIA
Project: 210810- Type Work: Widening
Descp: 1-20FM ALCOVY ROAD INCL INTERCHANGE TO
SR 142 IN COVINGTON Lanes: Exist. 4 Prop. 6
Length: 2.73
TlP#: NE-AR-002A
Project: 231210- Type Work: Widening
Descp: SR 1621SALEM RD FM BROWN BR RD/NEWTN TO
S/FLAT SHOALSIRCKDLE
Lanes: Exist. 2 Prop. 6
Length: 3.72
TIP#: NE-004
Project: 231220 Type Work: Widening
Descp: SR 142 FM S OF SR 121US 278 NORTH TO N OF CR
75 IN COVINGTON Lanes: Exist. 2 Prop. 4
Length: 1.07
TIP#:
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL LUMP
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL LUMP
Phase PE ROW CST
Fund STP STP STP
Year Underway
LUMP LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year 2007 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase PE ROW CST
Fund 1M NHS Bond
Year Underway
2005 2006
Phase PE ROW CST
Fund NHS NHS Bond
Year Underway
2005 2006
Phase PE ROW CST
Fund STP STP STP
Year 2005 After 2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
2005 After 2007
Federal $0
$360,000
Federal $0
$630,858
Federal $129,600 $122,400
Federal $350,000
State $0
$40,000
State $0
$70,095
State $14,400 $13,600
State $0
Federal $12,000
State $3,000
Federal $292,000
State $0
Federal $278,400
State $0
Federal
$5,250,400 $0
State
$1,312,600 $9,550,000
Federal
State
$4,903,200 $0
$1,225,800 $24,583,000
Federal $1,840,000
State $460,000
Federal $480,000
State $120,000
Other $25,000
$0 Other $476,000
$0 Other
$0 $0 Other $87,500
Other $0
Other $73,000
Other $69,600
Other $0 $0
Other $0 $0
Other $0
Other $0
Total $25,000 $400,000 Total $476,000 $700,953 Total $144,000 $136,000 Total $437,500
Total $15,000
Total $365,000
Total $348,000
Total $6,563,000 $9,550,000
Total $6,129,000 $24,583,000
Total $2,300,000
Total $600,000
Page 235 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 20/2005
Newton
Project: 231630- Type Work: Widening
Descp: SR 121US 278 FM COVINGTON BYPASS/CR 653
EAST TO SR 142 Lanes: Exisl. 2 Prop. 4
Length: 3.45
TIP#: NE-007
Project: 232330. Type Work: Intersection Improvement
Descp: SR 36 AT FLAT SHOALS/STEELE RD/CR 181 & HENDERSON MILLlCR508 Length: 0.80
LUMP SUM PROJECT
TIP#:
Project: 242230- Type Work: Widening Descp: SR 142 FM 1-20TO ALCOVY RD IN COVINGTON
Lanes: Exist. 2 Prop. 4
Length: 1.70 TIP#:
Project: 245190. Type Work: Intersection Improvement
Descp: SR 212 FROM BETHANY ROAD TO OAK HILL
ROAD
Length: 2.11
TlP#: NE-OII
Project: 245380. Type Work: Replace Bridge Descp: SR 20 @ SOUTH RIVER NEWTON-HENRY CO LINE
Length: 0.61
TlP#: NE-OI2
Project: 333172- Type Work: Replace Bridge Descp: SR 36@ SOUTH RIVER AT BUTTS-NEWTON CO
LINE Length: 0.40
TIP#:
Phase Fund PE STP ROW STP CST STP
Year Underway
2005 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase Fund PE STP ROW STP CST STP
Year Underway
2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
2005 2007
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway
2005
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 After 2007
Federal $240,000
Federal $0
$1.242,900 Federal
$2,343,200
Federal $696,000 $1,844,000 Federal
$1,785,600 Federal $12,000
State $60,000
State $50,000 $138,100 State $585,800
State $174,000 $461,000 State
$446,400 State
$3,000
Other $0
Other $300,000
$0 Other
$0
Other $0 $0
Other
$0 Other
$0
Total
$300,000 Total
$350,000 $1,381.000 Total $2,929,000 Total $870,000 $2,305.000 Total $2.232,000 Total
$15,000
Page 236 of 300
.'
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 217/2005
Oconee
Project: 0002351 Type Work: Streetscapes Descp: WATKINSVILLE DOWNTOWN STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 142060. Type Work: Widening
Descp: SR 53 & MARS HILL RDICR 264 FM SR 15 TO SR
316 & OCONEE CONN
Lanes: Exist. 2 Prop. 4
Length: 3.57
TIP#: R-14
Project: 171460. Type Work: Bicycle/Ped. Facility
Descp: SIMONTON BRIDGE ROAD FM WATKINSVILLE TO
CLARKE COUNTY
Length: 2.50
LUMP SUM PROJECT
TIP#: VOl
Project: 171574. Type Work: Sidewalks
Descp: STREETSCAPES FOR BUTLER'S CROSSING IN
WATKINSVILLE
Length: 4.90
LUMP SUM PROJECT
TIP#: v-os
Project: T001115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rall- Phase II
Length: 0.00 TIP#:
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year LUMP LOCL LUMP
Phase Fund CST HPP
Year 2005
Federal $2,777,600
State $694,400
Federal $0 $0
$315,200
State $0 $0 $0
Federal $18,400 $0
$181,600
State $0 $0 $0
Federal $5,702,000
State $1,425,500
Other $125,000
Other $0
Other $0 $0
$78,800
Other $4,600
$0 $45,400
Other $0
Total $625,000
Total $3,472,000
Total $0 $0
$394,000
Total $23,000
$0 $227,000
Total $7,127,500
Page 237 of 300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM
2flI2QQ5
Oglethorpe
Project: 0001221 Type Work: Bridge Rehab
Descp: SR 101 US 78 OVER MOSS CREEK 1.4 MI W OF
ARNOLDSVILLE Lanes: Exist. 2 Prop. 4
Length: 0.20
TlP#:
Project: 132660. Type Work: Widening
Descp: SR 10lUS 78 FM WHIT DAVIS RD/CR 166 TO
SMOKEY/CR 26/& OGLETH
Lanes: Exist. 2 Prop. 4
Length: 11.48
TJP#: R-41
Project: 222460- Type Work: Passing Lanes
Descp: SR 10: OGLETHORPE MP13.7-15;15.3-16.2&
WILKES: 0-1.5;5.5-7.0 Lanes: Exist. 2 Prop. 3
Lenglh: 5.70
TJP#:
Project: 231910- Type Work: New Construction
Descp: CRAWFORD/LEXINGTON BYP FM E OF CR
116/SMOKEYRD SE TO SR 22
Lanes: Exist. 0 Prop. 4
Length: 7.10
TIP#:
Project: 245372. Type Work: Replace Bridge Descp: SR 22 @ SOUTH FORK BROAD RIVER 4 MI NE OF
SMITHSONIA Length: 0.38
TJP#:
Phase Fund
PE
Bridge
CST Bridge
Year Underway
2006
Federal $66,400
State $16,600
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Federal $5,656,800
State $1,414,200
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 2007
Federal
$72,000 $4,812,800
State
$18,000 $1,203,200
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Federal $1,755,200
State $438,800
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 2007
Federal
$8,000 $1.292,800
State
$2,000 $323,200
Other $0
Other $0
Other $0 $0
Other $0
Other $0 $0
Total $83,000 Total $7,071,000 Total $90,000 $6,016,000 Total $2,194,000 Total $10,000 $1,616.000
Page 238 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005
Paulding
Project: 0002120 Type Work: Bicycle/Ped. Facility
Descp: SILVER COMET TRAIL APPROACHES TO THE US
278 TUNNEL
Length: 0.80
TlP#: PA AR BPOO
Project: 0002121 Type Work: Bicycle/Ped. Facility
Descp: WINNDALE ROAD SPUR TO THE SILVER COMET
TRAIL
Length: 0.21
TlP#: PA AR BPOO
Project: 0004208 Type Work: Sidewalks Descp: DAlLAS CONNECTING SIDEWALKS
Length: lAO TlP#: PA-AR-BPOO
Project: 0004688 Type Work: New Construction Descp: EAST HIRAM PARKWAY FM SR 92 TO US 278
Lanes: Exist. 0 Prop. 4
Length: 2.70 TlP#: PA-OI6
Project: 0005830 Type Work: Intersection Improvement Descp: SR 92 AT CEDARCREST RD AND AT DALLAS
ACWORTH HIGHWAY/CR 473 Length: 0040
TlP#:
Project: 0006049 Type Work: Widening
Descp: SR 360 FM SR 176/NEW MACLAND ROAD TO SR
120IPAULDING COUNTY
Lanes: Exist. 2 Prop. 4
Length: 5.80
TlP#: CO-367
Project: 0006589 Type Work: Streetscapes Descp: DOWNTOWN DALLAS STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 0006590 Type Work: Welcome center facilities Descp: PAULDING COUNTY CHAMBER OF COMMERCE
WELCOME CENTER RESTROOM Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006755 Type Work: Special Studies Descp: SR 6/CAMP CREEK PKWY FM 1-85 TO W HIRAM
PKWY- CORRIDOR STUDY Length: 29.07
TlP#: AR-465
Project: 0006858 Type Work: Multi-use Trail
Descp: WILLIAMS LAKE ROAD TRAIL CONNECTION TO
SCHOOLS & PARK
Length: 0.00
TlP#: PA-AR-BPOO
Project: 0006928 Type Work: Intersection Improvement Descp: SR 92 @ CR 466/DUE WEST ROAD
Length: 0040 TlP#: PA-092D2
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
Local
ROW Local
CST CMAQ
Year LOCL LOCL 2005
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year Underway
2006 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year 2006
Phase Fund CST CMAQ
Year 2007
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL 2007
Federal $0 $0
$120,000
State $0 $0 $0
Federal $0 $0
$37,600
State $0 $0 $0
Federal $0 $0
$700,000
State $0 $0 $0
Federal
State
$0
$2,475,000
$0 $11,015,000
Federal $104,000
State $26,000
Federal $1,440,000
State $360,000
Federal $500,000
State $0
Federal $50,400
State $0
Federal $600,000
State $0
Federal $280,000
State $0
Federal $0 $0
$240,000
State $0 $0 $0
Other $0 $0
$30,000
Other $0 $0
$9,400
Other $175,000 $125,000 $175,000
Other $0 $0
Other $0
Other $0
Other $125,000
Other $12,600
Other $150,000
Other $70,000
Other $80,000 $40,000 $60,000
Total $0 $0
$150,000
Total $0 $0
$47,000
Total $175,000 $125,000 $875,000
Total $2,475,000 $11,015,000
Total $130,000
Total $1,800,000
Total $625,000
Total $63,000
Total $750,000
Total $350,000
Total $80,000 $40,000 $300,000
Page 239 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zmZ005
Paulding
Project: 621570- Type Work: Widening Descp: SR 61 FM SR 120 CONN TO SR 6/DALLAS BYPASS
Lanes: Exist. 2 Prop. 4
Length: 4.10 TlP#: PA06ICI
Project: 621720- Type Work: Widening
Descp: SR 92 FM NEBO RD S/HIRAM TO SR 120 INCL
POWDER SPINGS CK;BRD
Lanes: Exist. 2 Prop. 4
Length: 4.45
TIP#: PA092BI
Project: 632920- Type Work: Replace Bridge Descp: SR 120@SILVERCOMET 1.1 MI SW OF DALLAS
Length: 0.10 TlP#: PA-026
Project: 632921- Type Work: Replace Bridge Descp: SR 92@ CR 511- SOU RR (719809H) IN HIRAM
Length: 0.24 TlP#: PA-027
Project: 641830- Type Work: Widenirig Descp: SR 61 BRIDGE OVER SILVER COMET TRAIL
Lanes: Exist. 2 Prop. 4 LUMP SUM PROJECT
Length: 0.03 TIP#: PA-OI7A
Project: 670366. Type Work: Replace Bridge Descp: CR 84210LD HARRIS ROAD @ SOUTHERN RR
(719808G) SE OF DALLAS Length: 0.23
TlP#: PA-025
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year Underway
2006 After 2007
Federal $4.550,400
State $1,049,600
Phase PE ROW CST
Fund STP STP STP
Year Underway
2006 After 2007
Federal $16,901,600
State $4,225,400
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 2006
Federal
$8,000 $425,600
State
$2,000 $106,400
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 After 2007
Federal $10,400
State $2,600
Phase Fund
PE
Bridge
CST Bridge
CST STP
Year Underway After 2007
LUMP
Federal $1,125,000
State $125,000
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2005
Federal
$0 $650,977
State
$0 $162,744
Other $0
Other $0
Other $0 $0
Other $0
Other
$0 Other $300,000 $203,430
Total
$5,600,000
Total $21,127,000
Total
$10,000
$532,000
Total
$13,000 Total $1,250,000
Total
$300,000
$1.017.151 Page 240 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217!2QQ5
Peach
Project: 0000951 Type Work: Replace Bridge
Descp: CR 49/0LD MACON ROAD OVER NORFOLK
SOUTHERN RAILROAD Lanes: Exist. 0 Prop. 2
Length: 0.16
TIP#:
Project: 0003623 Type Work: Miscellaneous Improvement Descp: SR 49 FROM SR 96 TO CS 632 - DRAINAGE
STRUCTURES/FORT VALLEY Length: 0.72
TIP#:
Project: 0004206 Type Work: Intersection Improvement
Descp: SR 49 AT CR 145/CHAPMAN; OLD MACON; INDUSTRIAL & WOODLAND Length: 0.52
LUMP SUM PROJECT
TIP#:
Project: 0006117 Type Work: Railroad Crossing Descp: CS 643/GREEN STREET @ NS #734052V
LUMP SUM PROJECT
Length: 0.20 TIP#:
Project: 0006454 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN
PEACH COUNTY
Length: 0.00
LUMP SUM PROJECT
T1P#:
Phase Fund PE State ROW Local CST State
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund
PE
STP
ROW Local
CST STP
Phase Fund CST STP
Phase Fund
PE
STP
CST STP
Year 2005 LOCL After 2007
Year Underway
2005 2007
Year Underway
LOCL LUMP
Year LUMP
Year Underway
LUMP
Federal $0 $0
Federal $632,000 $1,208,800
Federal $0
$414,000
Federal $135,000
Federal $176,000
State $100,000
$0
State $158,000 $302,200
State $0
$46,000
State $0
State $44,000
Other $0
$100,000
Other $0 $0
Other $487,500
$0
Other $0
Other $0
Total $100,000 $100,000
Total $790,000 $1,511,000
Total $487,500 $460,000
Total $135,000
Total $220,000
Page 241 of 300
STATE TRANSPORTA nON IMPROVEMENT PROGRAM 2/7/2005
Pickens
Project: 0008418 Type Work: Roadway Project
Descp: SR 53 FM CR 271/CARTER MOUNTAIN RD TO CR
178IDAVIS RD
Length: 2.40
LUMP SUM PROJECT
TIP#:
Project: 0008585 Type Work: Streetscapes Descp: NELSON PEDESTRIAN ENHANCEMENTS
LUMP SUM PROJECT
Length: 0.00 TlP#:
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase Fund CST STP
Year LUMP
Federal
$315,000 $2.430,000
Federal $400,000
State
$35,000 $270,000
State $0
Other
$0
$0 Other
$100,000
Total
$350,000 $2.700.000
Total $500,000
Page242of300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005
Pierce
Project: 0001937 Type Work: Railroad Crossing Oescp: CR 218/SANDY BOTTOMS ROAD @ CSX #638163A
LUMP SUM PROJECT
Length: 0.20 TlP#:
Project: 0003087 Type Work: Replace Bridge
Oescp: SR 15@ FISHING CREEK 2 MILES NORTH OF
BRISTOL
Length: 0.50
TlP#:
Project: 0003782 Type Work: Intersection Improvement Oescp: SR 38 AT CR 178IHACKELBARNEY ROAD
LUMP SUM PROJECT
Length: 0.32 TIP#:
Project: 533170- Type Work: Replace Bridge Oescp: SR 15@ BIG SATILLA CREEK & OfF AT
PIERCE/APPLING COUNTY LN Length: 1.39
TlP#:
Phase Fund CST STP
Year LUMP
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 2007
Phase Fund PE STP CST STP
Year Underway
LUMP
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Federal $145,000
Federal $35,200
$2,162,400 Federal $287,100
Federal
$3,533,600
State $0
State $8,800
$540,600 State $31,900
State
$883,400
Other $0
Other $0 $0
Other $0
Other
$0
Total $145,000
Total $44,000 $2,703,000 Total $319,000
Total
$4,417,000
Page 243 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
2!7I2QQ5
Pike
Project: 0006599 Type Work: Streetscapes
Descp: ZEBULON REVITALIZATION COURTHOUSE COMMERCIAL DIST - PHASE I Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006600 Type Work: Multi-use Trail Descp: MOLENA WALKING TRAIL PROJECT
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 333110.
Type Work: Intersection Improvement
Descp: SR 18/SR 109 AND SR 74 INTERSECTION
IMPROVEMENT
Length: 0.20
TlP#:
Project: 333145- Type Work: Replace Bridge Descp: SR 18@ ELKINS CREEK .1 MI W OF ZEBULON
Length: 0.38 TlP#:
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2006
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2006
Federal $410,400
Federal $124,800
Federal $216,000 $538,400 Federal
$1,223,200
State $0
State $0
State $54,000 $134,600 State
$305,800
Other
$102,600
Total $513,000
Other
$31,200
Total $156,000
Other
$0
$0
Other
Total $270,000 $673,000
Total
$0
$1,529,000
Page 244 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2!7/2QQ5
Polk
Project: 0006626 Type Work: Streetscapes Descp: CEDARTOWN MAIN STREET STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 T1P#:
Project: 0006627 Type Work: Streetscapes
Descp: ROCKMART STREETSCAPE ENHANCEMENT
PROJECT - PHASE II
Length: 0.00
LUMP SUM PROJECT
T1P#:
Project: 621860- Type Work: Widening
Descp: CEDARTOWN BYPASS/US 27 FM SR 100 N TO
JUST S. OF CR 334 Lanes: Exist. 2 Prop. 4
Length: 5.71
TfP#:
Project: 670678- Type Work: Repiace Bridge
Descp: CR 1821BETHLEHEM ROAD @ FISH CREEK 5.7 MI
W OF ROCKMART
Length: 0.25
T1P#:
Phase Fund CST STP
Year LUMP
Federal $500,000
State $0
Phase Fund CST STP
Year LUMP
Federal $224,800
State $0
Phase Fund
PE
State
PE
Bond
ROW Bond
CST Bond
Phase Fund
PE
Bridge
ROW Local
CST Bridge
CST STP
Year Underway Underway Underway
2005
Year Underway
LOCL 2006 2006
Federal
State
$0 Federal
$25,325,000 State
$0 $395,200 $395,200
$0 $98,800 $98,800
Other $125,000
Other $56,200
Other
$0 Other $10,000
$0 $0
Total $625,000
Total $281,000
Total
$25,325,000 Total $10,000 $494,000 $494,000
Page 245 of 300
STA TE TRANSPORTATION IMPROVEMENT PROGRAM 2m2005
Pulaski
Project: 0005533 Type Work: Replace Bridge
Descp: SR 11 @ BLUFF CREEK 4.7 MILES E OF
FINLEYSON
Lenglh: 0.20
TlP#:
Project: 0005548 Type Work: Replace Bridge
Descp: SR 11 @BIGTUCASAWATCHEE CREEK 3.7 MILES
S OF HAWKINSVILLE
Length: 0.20
TIP#:
Project: 333080. Type Work: Replace Bridge Descp: SR 257 @ TEN MILE CREEK 3.5 MI NW OF
FINLEYSON Length: 0.57
TlP#:
Project: 343000.
Type Work: Replace Bridge
Descp: SR 230 @ BIG CREEK 5.6 MILES WEST OF
HAWKINSVILLE
Lenglh: 0.58
TlP#:
Phase Fund PE Bridge ROW Bridge CST Bridge
Year 2005 After 2007 After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year 2005 After 2007 After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 After 2007
Federal $62,400
State $15,600
Federal $63,200
State $15,800
Federal $20,000
State $5,000
Federal $248,800
State $62,200
Other
$0
Total $78,000
Other
$0
Total $79.000
Other
$0
Total $25,000
Other $0
Total $311,000
Page246of300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 2J7I2QQ5
Putnam
Project: 0001077 Type Work: Intersection Improvement Descp: SR 16 FM JEFFERSON AVE TO EAST OF ROOTY
CREEK IN EATONTON Length: 0.90
LUMP SUM PROJECT
TIP#:
Project: 0003267 Type Work: Replace Bridge
Descp: CR 69/PARKS ROAD @ ROOTY CREEK 3.5 MI SE
OF EATONTON
Length: 0.30
TIP#:
Project: 0006252 Type Worle Widening
Descp: SR 44 FM WEST US 441 BYPASS TO CR
54/L1NGER LONGER RD
Lanes: Exist. 2 Prop. 4
Length: 15.00
TlP#:
Project: 222470- Type Work: Widening
Descp: SR 24/US 441 FM CR 245 TO EATONTON BYPASS
@US 129 Lanes: EXist. 2 Prop. 4
Length: 6.30
TIP#:
Project: 222560- Type Work: Widening
Descp: SR 24IUS 441 FM EATONTON BP @S/SHERWOOD
AVE TO MORGAN CL Lanes: Exist. 2 Prop. 4
Length: 9.19
TlP#:
Project: 231270- Type Work: Replace Bridge
Descp: SR 16 OVER THE OCONEE RIVER @ HANCOCK
COUNTY LINE
Length: 1.00
TIP#:
Project: 231620- Type Work: Widening
Descp: SR 44 FM MATHIS ROAD/JONES TO US
441IPUTNAM Lanes: Exist. 2 Prop. 3
Length: 10.73
TlP#:
Project: 232295- Type Work: Replace Bridge Descp: SR 16@ ROOTY CREEK IN EAST EATONTON
Length: 0.25 TIP#:
Project: 245350- Type Work: Replace Bridge Descp: SR 16@ CROOKED CREEK 6 MI E OF EATONTON
Length: 0.37 TlP#:
Phase Fund PE STP ROW STP CST STP
Year Underway Underway
LUMP
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2006
Phase Fund PE STP ROW STP CST STP
Year 2007 After 2007 After 2007
Phase Fund
PE State
PE
Bond
ROW Bond
CST Bond
Phase Fund
PE State
PE
Bond
ROW Bond
ROW Bond
CST Bond
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005 2007
Year Underway Underway
2006 2007 After 2007 Year Underway Underway 2005
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2006
Federal
State
$1,000,600
Federal $0
$600,000
Federal $3,692,000
$111,200
State $0
$200,000
State $923,000
Federal
State
$0 $0
Federal
$3,111,000 $26,442,000
State
$0 $0
Federal
$5,436,000 $6,000,000
State
$4,156,600
$1,039,200
Federal $4,992,600
State $1,246,200
Federal
State
$1,240,000 Federal
$310,000 State
$1,400,600
$350,200
Other
Total
$0
Other $10,000
$0
Other $0
$1,112,000
Total $10,000 $1,000,000
Total $4,615,000
Other
Total
$0 $0
Other
$3,111,000 $26,442,000
Total
$0 $0
Other
$5,436,000 $6,000,000
Total
$0 Other
$0
$5,196,000 Total
$6,241,000
Other
Total
$0 Other
$1,550,000 Total
$0
$1,751,000
Page 247 of 300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 21712005
Quitman
Project: 470950. Type Work: Replace Bridge
Descp: CR 84 @ PATAULA CREEK OVERFLOW 2.5 MI N
OF MORRIS
Lenglh: 0.22
TlP#:
Project: T001286 Type Work: Transit Projects Descp: Regional Transit for Quitman, Clay, Randolph &
Stewart Count Length: 0.00
TIP#:
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2007
Phase Fund CST Transit
Year 2005
Federal
$0 $420,800
Federal $491,330
State
$0 $105,200
State $0
Other
$0
$0
Other $98,266
Total
$0 $526,000
Total $589,596
Page 248 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2t7I2QQ5
Rabun
Project: 0000306 Type Work: Replace Bridge Descp: SR 28 @ NORTH FORK CHATTOOGA RIVER 13 MI
NE OF CLAYTON Length: 0.24
TIP#:
Project: 0005386 Type Work: Miscellaneous Improvement
Descp: SR 246 GAiSR 106 N CAROLINA ADVANCED TRUCK WARNING SYSTEM Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006322 Type Work: Replace Bridge
Descp: SR 2/US 76 OVER THE CHATTOOGA RIVER @ SC
LINE
Length: 0.20
TIP#:
Project: 122090. Type Work: Widening
Descp: SR 15IUS 441 FM NORTH CUCLAYTON TO NORTH
CAROLINA LINE Lanes: Ex/st. 2 Prop. 4
Lenglh: 7040
TIP#:
Project: 171580- Type Work: Replace Bridge Descp: LOW GAP ROADICR 80 AT TALLULAH RIVER 6.6 MI
SWOFTIGER Lanes: Ex/sl. 1 Prop. 2
Length: 0.10
TlP#:
Project: M002587 Type Work: Bridges
Descp: SR 15/US 441 @ BETTY CREEK BRIDGE
MAINTENANCE REHAB
Length: 0040
LUMP SUM PROJECT
TlP#:
Project: M002788 Type Work: Resurface & Maintenance Descp: SR 2 AT 1 LOC & SR 15 AT 2 LOCS IN RABUN
DECK REPLACEMENT Length: 1.20
LUMP SUM PROJECT
TlP#:
Phase Fund PE Bridge ROW STP CST Bridge CST STP
Phase Fund PE STP CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
Slate
PE
Bond
ROW Bond
ROW Bond
ROW Bond
CST E99
CST State
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Phase Fund
PE
NHS
CST NHS
Phase Fund PE STP CST STP
Year Underway
2006 2007 2007
Year Underway
LUMP
Year 2005 2005 2005
Year Underway Underway
2007 After 2007 After 2007 Underway After 2007
Year Underway
LOCL 2005
Year LUMP LUMP
Year LUMP LUMP
Federal
$22,400 $500,000 $500,000 Federal
$675,000
State
$5,600 $125,000 $125,000 State
$75,000
Federal $200,000
$40,000 $2,000,000
Federal
State $50,000 $10,000 $500,000
State
$0 $15,900,000
Federal
$0 $844,000
Federal $60,000
$400,000
State
$0 $211,000
State $15,000 $100,000
Federal $80,000
$800,000
State $20,000 $200,000
Other
$0 $0 $0 Other
$0
Total
$28,000 $625,000 $625,000 Total
$750,000
Other $0 $0 $0
Other
Total $250,000
$50,000 $2,500,000
Total
$0
$15,900,000
Other
$10,000 $0
Other $0 $0
Total
$10,000 $1,055,000
Total $75,000 $500,000
Other $0 $0
Total $100,000 $1,000,000
Page 249 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2al2QQ5
Randolph
Project: 0006527 Type Work: Water Pollution Mitig. Descp: 3 PARCELS TO MITIGATE PI#422115 &
422220/EARLY & 422230/CLAY Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006546 Type Work: RR Facilities Descp: SHELLMAN RAILROAD DEPOT
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 422230- Type Work: Widening
Descp: SR l/US27FM BLUFFTON BYP TO CARNEGIE VILU
RD/CR 153/RANDOLPH Lanes: Exist. 2 Prop. 4
Length: 6.86
TlP#:
Project: 422235. Type Work: Widening
Descp: SR 1/US 27 FM CARNEGIE VILULAH RD/CR 153 TO
CUTHBERT BYPASS Lanes: Exist. 2 Prop. 4
Length: 8.60
TlP#:
Project: 432095. Type Work: Replace Bridge
Descp: SR 50lUS 82 @ PACHITLA CREEK 4 MI E OF
CUTHBERT
Length: 0.30
TIP#:
Project: 442955. Type Work: Replace Bridge Descp: SR 216 @ CARTER CREEK 4.6 MI S OF CUTHBERT
Length: 0.51 TlP#:
Project: 442956. Type Work: Replace Bridge
Descp: SR 266 @ GEORGIA SOUTHWESTERN RAILROAD
2 MI W OF CUTHBERT
Length: 0.40
TlP#:
Project: T001286 Type Work: Transit Projects
Descp: Regional Transit for Quitman, Clay, Randolph &
Stewart Count
Lenglh: 0.00
TlP#:
Phase Fund ROW STP
Year LUMP
Federal $1.600.000
State $400.000
Phase Fund CST STP
Year LUMP
Federal $148,800
State $0
Phase Fund
PE
State
PE State
ROW RRBS
CST RRBS
Phase Fund
PE
State
PE
State
ROW RRBS
CST State
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2006 2007
Year Underway Underway
2006 After 2007
Year Underway Underway
2005
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund CST Transit
Year Underway
2005 2007 2007
Year 2005
Federal
State
$0 $0
Federal
$5.769.000 $16,025,000
State
$0 $5,451.000
Federal
State
$1.496.800
Federal
$11.200 $1.430,400
Federal
$40,000 $660.800 $378,400 Federal $491,330
$374.200
State
$2.800 $357.600
State
$10.000 $165.200
$94.600 State
$0
Other $0
Other $37.200
Other
$0 $0 Other
$0
Other
$0 Other
$0 $0
Other $0 $0 $0
Other $98.266
Total
$2,000.000
Total $186.000 Total
$5.769.000
$16,025.000
Total
$5,451.000
Total
$1.871.000 Total
$14.000
$1.788.000
Total $50.000 $826.000
$473.000
Total
$589.596
Page 250 of 300
.'
STATE TRANSPORTATION IMPROVEMENT PROGRAM
zrraoos
Richmond
Project: 0001794 Type Work: Widening
Descp: ALEXANDER DRIVE/CR 560 FM WASHINGTON RD
TO RIVERWATCH PKWY
Lanes: Exist. 2 Prop. 4
Length: 0.87
T1P#: STP-18
Project: 0001795 Type Work: Miscellaneous Improvement Descp: 1-20JUST EAST OF DAVIS ROAD - DRAINAGE
IMPRVS @ CRANE CREEK Length: 0.74
T1P#: IM-3
Project: 0002383 Type Work: Landscaping
Descp: LANDSCAPE GATEWAYS TO GEORGIA ON 1-20IN
RICHMOND CO.
Length: 1.00
LUMP SUM PROJECT
T1P#: TEA
Project: 0003790 Type Work: Intersection Improvement
Descp: SR 4/15TH STREET AT CR 2207/CENTRAL AVENUE
IN AUGUSTA
Length: 010
LUMP SUM PROJECT
T1P#: NHS LUMP S
Project: 0005925 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCATIONS ALONG SR 28 Length: 0.00
LUMP SUM PROJECT
T1P#: STP LUMP
Project: 0005934 Type Work: Railroad Crossing Descp: CR 479/ARTHERN ROAD @ CSX # 633711T
LUMP SUM PROJECT
Length: 0.20 T1P#: MSL
Project: 0006314 Type Work: Water Pollution Milig.
Descp: 8.45 WETLAND CREDITS TO MITIGATE PI# 250510-
RICHMOND COUNTY
Length: 0.00
LUMP SUM PROJECT
T1P#:
Project: 0006639 Type Work: Multi-use Trail Descp: AUGUSTA CANAL MULTI-USE TRAIL - PHASE III
LUMP SUM PROJECT
Length: 0.00 T1P#:
Project: 0006694 Type Work: Rail Projects Descp: AUGUSTA RAIL RELOCATION PROJECT
Length: 0.00 T1P#:
Project: 210450- Type Work: Interchange Descp: 1-20AT 1-520 INTERCHANGE RECONSTRUCTION
Length: 1.90 TIP#: NHS-2
Project: 210570- Type Work: Widening
Descp: 1-20FM BELAIR RD/COLUMBIA CO TO
RIVERWATCH PARKWAY/RICHMOND
Lanes: Exist. 4 Prop. 6
Length: 5.01
T1P#: NHS-6
Phase Fund PE Local PE STP ROW Local CST STP
Phase PE ROW CST
Fund 1M 1M 1M
Phase Fund CST STP
Phase Fund PE STP ROW Local CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund ROW STP
Phase Fund CST STP
Phase Fund CST H170
Phase PE ROW ROW CST
Fund NHS NHS NHS Bond
Phase Fund
PE
NHS
CST Bond
Year Underway Underway
LOCL 2006 Year Underway 2005 2005
Year LUMP
Year Underway
LOCL LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year 2005
Year Underway Underway
2005 2007 Year Underway 2007
Federal
State
$0 $3,545,600
Federal
$430,200 $9,129,600
$0 $886,400 State
$47,800 $1,014,400
Federal $449,600
State $112,400
Federal
$0 $105,300
Federal $800,000
State
$0 $11,700
State $200,000
Federal $190,000
State $0
Federal $13,600
State $3,400
Federal $600,000
State $0
Federal $1,000,000
State $0
Federal
State
$21,119,200 $0
Federal
$5,279,800 $85,672,660
State
$0 $36,100,000
Other
$460,000 $0
Other $0 $0
Other $0
Other $102,000
$0 Other
$0
Other $0
Other $0
Other $150,000
Other $0
Other
$0 $0 Other $0
Total
$460,000 $4,432,000
Total $478,000 $10,144,000 Total $562,000
Total $102,000 $117,000 Total $1,000,000
Total $190,000
Total $17,000
Total $750,000
Total $1,000,000
Total
$26,399,000 $85,672,660
Total $36,100,000
Page 251 of 300
STA TE TRANSPORTATION IMPROVEMENT PROGRAM
2t7/2QQ5
Richmond
Project: 210700.
Type Work: Widening
Descp: 1-520 FROM SR 4/US 1 TO GORDON HIGHWAY
Lanes: Exist. 4 Prop. 6
Length: 3.20 TlP#: NHS-IO
Project: 222710- Type Work: Median Work Descp: SR 10/US 78 FM SR 121/US 25 TO WALTON
WAY-CONSTRUCT BARRIER Length: 3.50
TlP#: NHS-7
Project: 227800. Type Work: ATMSIITS Descp: ATMS/ AUGUSTA SLO SCAN/CMS/RADAR
Length: 0.00 TlP#: NHS-9
Project: 227805- Type Work: ATMS/ITS
Descp: ATMS/I-20 COMMUNIC/SURVEILLANCE FM SR
388/COLUMBIA TO SC
Length: 1172
TlP#: NHS-9
Project: 227810. Type Work: ATMS/ITS
Descp: ATMS/ AUGUSTA/RICHMOND COUNTY/GDOT
REGIONAL TCC
Length: 0.00
TlP#: NHS-9
Project: 245320- Type Work: Widening
Descp: WINDSOR SPRNGS RD/CR 65 FM SR
88/HEPHZIBAH TO WILLIS FOREMAN
Lanes: Exist. 2 Prop. 4
Length: 2.25
TlP#: STP-17
Project: 245325- Type Work: Replace Bridge
Descp: CR 651WINDSOR SPRINGS RD @ NOR-SOU RR
(734145PjIHEPHZIBAH
Lanes: Exist. 2 Prop. 4
Length: 0.21
TlP#: BRM-I
Project: 250510. Type Work: Widening
Descp: WRIGHTSBORO RD/CR 1501 FM JIMMIE DYESS
PKWY TO 1-520 RAMPS
Lanes: Exist. 2 Prop. 4
Length: 2.55
TlP#: STP-6
Project: 250560- Type Work: Widening
Descp: DAVIS RD FM SKINNER MILL TO WASHINGTON RD
&1-20 HALF DIAMOND
Lanes: Exist. 2 Prop. 4
Length: 1.60
TlP#: STP-8
Project: 250610- Type Work: Widening
Descp: WINDSOR SPRINGS RD/CR 65 FM WILLIS
FORMAN RD TO TOBACCO RD
Lanes: Exist. 2 Prop. 4
Length: 2.68
TlP#: STP-16
Project: 250615. Type Work: Replace Bridge
Descp: CR 651WINDSOR SPRINGS RD @ SPIRIT CREEK
2.7 MI N/HEPHZIBAH
Lanes: EXist. 2 Prop. 4
Length: 0.21
TIP#: BRM-6
Phase Fund PE NHS ROW NHS CST Bond
Year 2005 After 2007 After 2007
Phase Fund
PE
NHS
ROW Local
CST NHS
Year Underway
LOCL 2006
Phase Fund CST NHS
Year 2007
Federal $1,056,000
Federal $0
$3,576,800
Federal $1,320,800
State $264,000
State $0
$894,200
State $330,200
Other $0
Other $0 $0
Other $0
Phase Fund CST NHS
Year 2007
Federal $15,520,800
State $3,880,200
Other $0
Phase Fund CST NHS
Year 2006
Federal $968,000
State $242,000
Other $0
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2007
Phase Fund
PE
Bridge
CST Bridge
Year Underway
2007
Federal
$0 $5,980,000
State
Other
$0 $1,495,000
$8,343,000 $0
Federal $800,000
State $200,000
Other $0
Phase PE ROW CST
Fund STP STP STP
Year Underway
2005 2007
Phase Fund
PE
STP
ROW 077
CST STP
Year Underway Underway
2005
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL 2007
Phase Fund
PE
Bridge
CST Bridge
Year Underway
2007
Federal
$4,320,000 $9,200,000
State
$1,080,000 $2,300,000
Federal
State
Other $0 $0
Other
$8,231,200 $2,057,800
$0
Federal
$0 $8,364,000
State
Other
$0 $2,091,000
$9,955,000 $0
Federal $620,800
State $155,200
Other $0
Total
$1,320,000
Total $0 $4,471,000
Total
$1,651,000 Total
$19,401,000
Total
$1,210,000 Total
$8,343,000
$7,475,000
Total $1,000,000
Total
$5,400,000
$11,500,000 Total
$10,289,000 Total
$9,955,000
$10,455,000
Total $776,000
Page 252 of300
.;
STATE TRANSPORTATION IMPROVEMENT PROGRAM ZaJ2005
Richmond
Project: 262750- Type Work: New Construction
Descp: ST. SEBASTIAN/GREENE ST EXT/SR 28 NEAR CSX
RR & 15TH ST
Length: 2.00
TlP#: DEMO-3
Project: M002958 Type Work: Bridges
Descp: SR 10@6LOCATIONS IN RICHMOND COUNTY-
DECK REPLACEMENT
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: TOO0648 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR AUGUSTA
Length: 0.00 TlP#:
Project: TOO0649 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR AUGUSTA
Length: 0.00 TlP#:
Project: TOO0650 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR AUGUSTA
Length: 0.00 TlP#:
Project: TOO0913 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR AUGUSTA
Lenglh: 0.00 TlP#:
Project: TOO0914 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR AUGUSTA
Lenglh: 0.00 TlP#:
Project: TOO0915 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR AUGUSTA
Lenglh: 0.00 TlP#:
Project: T001229 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR AUGUSTA
Length: 0.00 TIP#:
Project: T001230 Type Work: Transit Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR AUGUSTA
Length: 0.00 TIP#:
project: T001231 Type Work: Transit Projects DesCP: FY 2007 SECTION 5310 CAPITAL FOR AUGUSTA
Length: 0.00 TIP#:
Phase Fund PE Demo ROW Local CST Demo CST Demo CST Demo Phase Fund PE NHS CST NHS
Year Underway
LOCL 2006 2006 2006 Year LUMP LUMP
Federal
$0 $5,596,800 $1,635,200 $6,394,450
Federal $180.000 $1.800.000
State
Other
$0 $1.399.200
$408.800 $336,550 State
$45,000 $450.000
$7,789,000 $0 $0 $0
Other $0 $0
Phase Fund CST Transit
Year 2005
Federal $1.696,464
State $212,058
Other $212,058
Phase Fund CST Transit
Year 2005
Federal $400.000
State $50,000
Other $50.000
Phase Fund CST Transit
Year 2005
Federal $59,490
State $14,873
Other $0
Phase Fund CST Transit
Year 2006
Federal $3.162,600
State $395,325
Other $395,325
Phase Fund CST Transit
Year 2006
Federal $400,000
State $50.000
Other $50,000
Phase Fund CST Transit
Year 2006
Federal $62,465
State $15,616
Other $0
Phase Fund CST Transit
Year 2007
Federal $1,188,600
State $148.575
Other $148.575
Phase Fund CST Transit
Year 2007
Federal $400.000
State $50.000
Other $50,000
Phase Fund CST Transit
Year 2007
Federal $65,588
State $16,397
Other $0
Total $7,789,000 $6,996,000 $2,044.000 $6.731.000
Total $225,000 $2.250.000
Total $2,120,580
Total $500,000
Total $74,363
Total $3.953,250
Total $500,000
Total $78,081
Total $1,485.750
Total $500,000
Total $81.985
Page 253 of 300
STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005
Rockdale
Project: 0000416 Type Work: Widening
Descp: SR 20 FM SHARON CHURCH RD TO PLEASANT
HILL RD Lanes: Exist. 2
Prop. 4
Length: 4.29
TlP#: AR-9\9
Project: 0003166 Type Work: HOV Lanes
Descp: 1-20 FM EVANS MILL RD/DEKALB TO SALEM
RD/ROCKDALE HOV LANES
Lanes: Exist. 6 Prop. 8
Length: 9.73
TIP#: AR-H-2S\A
Project: 0004433 Type Work: Widening
Descp: PARKER RD FM MILLERS CHAPEL RD TO FLAT
SHOALS RD PHASE 3 Lanes: Exist. 2 Prop. 4
Length: 0.59
TlP#: RO-OISE
Project: 0004434 Type Work: Minor Widen & Resurf
Descp: SR 1621SALEM ROAD FM FLAT SHOALS RD TO
OLD SALEM ROAD
Length: 0.42
TlP#: RO-206
Project: 0004487 Type Work: Intersection Improvement
Descp: SIGMAN ROAD AT EASTVIEW ROAD FY 2004 LCI
PROJECT
Length: 0.40
LUMP SUM PROJECT
TlP#: RO AR 203
Project: 0004647 Type Work: Intersection Improvement Descp: IRIS DRIVE AT MCDANIEL MILL ROAD
Length: 0.40 TIP#: RO-230
Project: 0004648 Type Work: Intersection Improvement Descp: LENORA CHURCH ROAD AT PLEASANT HILL
ROAD Length: 0.40 TlP#: RO-D\
Project: 0004649 Type Work: Intersection Improvement Descp: OLD SALEM ROAD AT MCCALLA ROAD
Length: 0.30 TlP#: RO-232
Project: 0004650 Type Work: Intersection Improvement Descp: SIGMAN ROAD AT GEES MILL ROAD
Length: 0.40 TlP#: ROD3
Project: 0005933 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCATIONS IN ROCKDALE CO Length: 0.00
LUMP SUM PROJECT
TlP#: Lump
Project: 0005955 Type Work: Widening
Descp: SR 121COVINGTON HIGHWAY FM SR 124 TO LAKE
CAPRI ROAD
Lanes: EXist. 2 Prop. 4
Length: 1.25
TIP#: DK030B
Phase Fund
PE
STP
ROW STP
CST STP
Year After 2007 After 2007 After 2007
Phase Fund
PE
NHS
PE
Bond
ROW NHS
CST NHS
Phase PE ROW CST
Fund Bond Bond Bond
Year After 2007
2007 After 2007 After 2007
Year Underway
2006 2007
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year Underway
2006 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
LUMP LUMP
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year Underway
2005 2006
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year Underway
2005 2006
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year Underway
2005 2006
Phase Fund
PE
Bond
ROW Bond
CST Bond
Year 2005 2006 2007
Phase Fund CST STP
Year LUMP
Phase Fund
PE
STP
ROW STP
CST STP
Year 2007 After 2007 After 2007
Federal
State
Federal $0
State $7,100,000
Federal
$0 $0
State
$1,050,000 $3,000,000
Federal
$0 $0
State
$1,250,000 $2,500,000
Federal
$72,000 $400,000
State
$0 $0
Federal
$0 $0
State
$195,000 $480,000
Federal
$0 $0
State
$320,000 $450,000
Federal
$0 $0
State
$170,000 $525,000
Federal $0 $0 $0
State $72,000 $240,000 $550,000
Federal $400,000
State $100,000
Federal $32,000
State $8,000
Other
Other $0
Other $0 $0
Other $0 $0
Other $13,000 $104,000
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0 $0
Other $0
Other $0
Total
Total
$7,100,000 Total
$1,050,000
$3,000,000
Total
$1,250,000
$2,500,000
Total
$85,000 $504,000 Total
$195,000
$480,000
Total $320,000
$450,000
Total
$170,000
$525,000
Total
$72,000
$240,000
$550,000 Total
$500,000
Total
$40,000
Page 254 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Rockdale
Project: 0006257 Type Work: Landscaping Descp: SR 138/SR 20 COMMON SECTION
BEAUTIFICATION INITIATIVE Lenglh: 2.80
TIP#: RO-138C
Project: 0006697 Type Work: Multi-use Trail
Descp: GEORGIA VETERANS MEMORIAL PARK IN
ROCKDALE
Length: 0.00
TlP#:
Project: 231210- Type Work: Widening
Descp: SR 1621SALEM RD FM BROWN BR RD/NEWTN TO
S/FLAT SHOALSIRCKDLE
Lanes: Exist. 2 Prop. 6
Length: 3.72
TlP#: NE-004
Project: 714065- Type Work: ATMS/ITS
Descp: ATMS/I-20 COMM/SURVEILLANCE FM 1-285/DEK
TO SR138/SR201R0CK
Length: 14.93
TlP#: AR-305
Project: 731047- Type Work: Widening
Descp: SR 138/SR 20 FROM NORTH OF 1-20TO SIGMAN
ROAD Lanes: Exist. 4
Prop. 6
Length: 1.70
TIP#: RO-138D
Project: 742980- Type Work: Replace Bridge Descp: SR 212 @ HONEY CREEK 2.5 MI S OF JCT SR 138
Length: 0.76 TlP#: RO-229
Project: 752200- Type Work: Widening
Descp: SR 20/CR 435/SIGMAN RD FM IRWIN BRIDGE
RD/CR 442 TO SR 138
Lanes: Exist. 2 Prop. 4
Length: 2.72
TIP#: RO-OI4B
Project: 752270- Type Work: Widening
Descp: OLD COVINGTON HWY FM GREEN ST TO SR
138/20 Lanes: Exist. 2
Prop. 4
Length: 0.65
TIP#: RO-034
Project: 752360 Type Work: Widening
Descp: FLAT SHOALS ROAD FROM OLD SALEM ROAD TO
SALEM ROAD Lanes: Exist. 2 Prop. 4
Lenglh: 1.34
TIP#: RO-025C
Project: 752380 Type Work: Widening
Descp: PARKER RD/CR 92 FM S/FLAT SHOALS TO
CULPEPPER DR/CS 651
Lanes: Exist. 2 Prop. 5
Length: 1.07
TlP#: RO-OI5D
Project: 752400 Type Work: Replace Bridge Descp: HURST ROAD AT HONEY CREEK
Lenglh: 0.40 TIP#: RO-049
Phase Fund PE HPP CST 4260
Year 2005 2005
Phase Fund CST H170
Year 2005
Federal $80,000
$720,000
State $0 $0
Other $20,000 $180,000
Federal $500,000
State $0
Other $0
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 After 2007 After 2007
Federal $1,840,000
State $460,000
Phase Fund PE NHS CST Bond
Year 2005 2006
Federal $160,000
$0
State $40,000 $24,715,176
Other $0
Other $0 $0
Phase Fund ROW NHS CST NHS
Year Underway
2006
Federal $7,985,600
State $1,996,400
Other $0
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
2006 2007 2007
Year 2005 LOCL After 2007
Federal
$16,000 $460,800 $942,400
Federal $4,000 $0
State
$4,000 $115,200 $235,600
State $1,000 $0
Other
$0 $0 $0
Other $0
$570,000
Phase PE ROW CST
Fund Bond Bond Bond
Year Underway
2006 2007
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL 2006
Federal
$0 $0
State
$250,000 $1,041,000
Other
$0 $0
Federal
$0 $4,248,800
State
Other
$0 $1,062,200
$2,000,000 $0
Phase PE ROW CST
Fund STP Bond Bond
Year Underway Underway
2005
Federal
State
Other
$0 $2,850,000
$250,000
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2007
Federal
$0 $562,400
State
$0 $140,600
Other
$300,000 $0
Total $100,000 $900,000
Total $500,000
Total $2,300,000
Total $200,000 $24,715,176
Total $9,982,000
Total $20,000 $576,000 $1,178,000 Total
$5,000 $570,000
Total $250,000 $1,041,000
Total $2,000,000 $5,311,000
Total
$3,100,000
Total $300,000 $703,000
Page 255 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM
zat2QQ5
Rockdale
Project: 752420- Type Work: Intersection Improvement Descp: ROCKBRIDGE RD/CR 74 @ MAIN ST IN CONYERS
LUMP SUM PROJECT
Length: 0.42 TlP#: RO-052
Project: 753075. Type Work: Turn Lanes Descp: SR 20 @ OGLESBY BRIDGE RD/CR 1
Lanes: Exist. 2 Prop. 3
Length: 0.40 T/P#: RO-202D
Project: 762440- Type Work: New Construction
Descp: SMYRNA RD & DOGWOOD DR EXTENSION FM
OLD COVINGTOr-J TO DOG'vVOOD
Lanes: Exist. 0 Prop. 2
Length: 0.65
TlP#: RO-023A
Project: T000600 Type Work: Transit Projects
Descp: FY 2005 SECTION 5310 CAPITAL FOR ROCKDALE
COUNTY
Length: 0.00
TIP#: AR-RO-5310
Project: T000997 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR ROCKDALE
COUNTY
Length: 0.00
TIP#: AR-RO-5310
Project: T001277 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR ROCKDALE
COUNTY Length: 0.00
TIP#: AR-RO-5310
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL Underway
Phase PE ROW CST
Fund Local Local PR
Year LOCL LOCL 2007
Phase Fund CST Transit
Year 2005
Phase Fund CST Transit
Year 2006
Phase Fund CST Transit
Year 2007
Federal $0
$225,000
Federal $0
Slale $0 $0
Slale $0
Federal $0 $0 $0
Slate $0 $0
$1,000,000
Federal $11,440
Slate $2,860
Federal $12,013
Stale $3.003
Federal $12,613
State $3,153
Other $0
$203,000
Olher $100,000
Other $50,000 $100,000
$0
Other $0
Olher $0
Other $0
Total $0
$428,000
Total $100,000 Total
$50,000
$100,000
$1,000,000
Total
$14,300
Total
$15,016 Total
$15,766
Page 256 of 300
.'
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Schley
Project: 322730- Type Work: Widening Descp: SR 3/US 19 FROM SR 271 TO SR 240
Lanes: Exist. 2 Prop. 4
Length: 10.37 TlP#:
Project: 343345- Type Work: Replace Bridge
Descp: SR 153@ UTILE MUCKALEE CREEK 3.0 MI E OF
JCT SR45
Length: 0.32
TIP#:
Phase PE PE ROW ROW CST Phase PE ROW CST
Fund State Bond Bond 43410 Bond
Fund Bridge Bridge Bridge
Year Underway Underway Underway Underway
2006 Year Underway 2005 After 2007
Federal
State
$0 Federal
$25,548,000 State
$24,000
$6,000
Other
Total
$0 Other
$0
$25,548,000 Total
$30,000
Page 257 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2012005
Screven
Project: 227830- Type Work: Replace Bridge
Descp: SR 73/US 301 @ SOUTH FORK OGEECHEE CRK
6.8 MI S OF SYLVANIA
Length: 0.44
TlP#:
Project: 227831- Type Work: Replace Bridge Descp: SR 73IUS 301 @ OGEECHEE CREEK 2.8 MI S OF
SYLVANIA Length: 0.29
TlP#:
Project: 231670- Type Work: Replace Bridge
Descp: SR 73IUS 301 @ OGEECHEE RIVER OVERFLOW
11 MI NW OF OLIVER Lanes: Exist. 2 Prop. 4
Length: 0.25
TlP#:
Project: 231680- Type Work: Replace Bridge
Descp: SR 73IUS 301 @ NORFOLK SOUTHERN RR
(620143J) SOUTH OF SR 17
Lanes: Exist. 2 Prop. 4
Length: 0.22
TlP#:
Project: 231760. Type Work: Widening
Descp: SR 73IUS 301 FM SR 17 N TO EXISTING 4LN AT
SYLVANIA BYPASS
Lanes: Exist. 2 Prop. 4
Length: 9.95
TlP#:
Project: 231790- Type Work: Widening
Descp: SR 73IUS 301 FROM NORTH END OF SYLVANIA
BYPASS TO CR 243
Lanes: Exist. 2 Prop. 4
Length: 13.95
TlP#:
Project: 231800. Type Work: Widening
Descp: SR 73IUS 301 FM CR 243 TO S.C. L1NE{& BRDGE @
SAVANNAH RVR}
Lanes: Exist. 2 Prop. 4
Length: 1.40
TlP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2006
Phase Fund
PE
Bridge
CST Bridge
Year Underway
2007
Federal $1,180,000
Federal $1,018,400
Federal $670,400
Phase Fund
PE
Bridge
CST Bridge
Year Underway
2007
Federal $1,132,800
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 After 2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 After 2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 After 2007 After 2007
Federal $836,000
Federal $1.172,800
Federal $295,200
State $295,000 State $254.600 State $167,600
State $283,200
State $209.000
State $293,200
State $73.800
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Total
$1,475,000 Total $1,273,000 Total
$838,000 Total
$1,416,000
Total
$1.045,000 Total
$1,466.000
Total $369,000
Page 258 of 300
...'''
STATE TRANSPORTATlON IMPROVEMENT PROGRAM
2al2QQ5
Seminole
Project: 0003767 Type Work: Roadway Project Descp: SR 39 FM N OF CR' 99/SPORTSMAN RD TO S OF
CR 71/DRAKE FARM RD Length: 0.50
TIP#:
Project: 0006547 Type Work: Streetscapes
Descp: DOWNTOWN STREETSCAPE IMPROVEMENTS -
PHASE II
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 442935- Type Work: Replace Bridge
Descp: SR 285 @ FISH POND DRAIN APP .5 MI N OF JCT
SR39
Length: 0.22
TIP#:
Phase Fund
PE
STP
ROW STP
CST STP
Year 2007 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Federal $32.000
Federal $450,400
State $8,000
State $0
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2006
Federal $1,063,200
State $265,800
Other $0
Other $112,600
Other $0
Total $40.000
Total $563.000
Total $1.329.000
Page 259 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 27/2005
Spalding
Project: 0000294 Type Work: Widening
Descp: SR 3/US 19/41 FM LAPRADE RD/CR 18 TO SR 20 IN
HENRY COUNTY Lanes: Exist. 4 Prop. 6
Length: 8.55
TlP#: HE166
Project: 0000403 Type Work: Median Work Descp: ATLANTA RD/US 19/41 BUS/SR 92 FM ELLIS RD TO
WTAYLOR ST Length: 0.90
TIP#:
Project: 0000408 Type Work: Intersection Improvement
Descp: SR 16@ CR 35NAUGHN RD & CR 507/ROVER
RD-- TURN LANES
Length: 0.20
LUMP SUM PROJECT
TlP#: AR 157
Project: 0000409 Type Work: Turn Lanes
Descp: SR 16 AT CR 496/688/0LD 85
CONNECTOR/HOLLONVILLE RD
Lanes: Exist. 2 Prop. 3
Length: 0.40
LUMP SUM PROJECT
TlP#: AR 157
Project: 0000410 Type Work: Intersection Improvement
Descp: SR 362 @ CR 507/ROVER-WILLIAMSON
ROADS--TURN LANES Lanes: Exist. 2 Prop. 3
Length: 0.48
LUMP SUM PROJECT
TlP#: AR t57
Project: 0000882 Type Work: Passing Lanes Descp: SR 155 NORTHBOUND FROM MP 9.79 TO MP 10.79
Lanes: Exist. 2 Prop. 3
Length: 1.07 TIP#: SPOO5
Project: 0001573 Type Work: Turn Lanes Descp: SR 3/US 19/41 MEDIAN TURN LANES FM GRIFFIN
TO HENRY CO LINE Length: 3.15
TlP#: SPOO7
Project: 0001818 Type Work: Railroad Crossing Descp: ARTHUR K. BOLTON PKWY/ SR 16 GRADE
SEPARATION AT NS RR Length: 1.02
TIP#: SPOO8
Project: 0003862 Type Work: Intersection Improvement Descp: SR 16 @ CR 551WILSON ROAD 2 MILES E OF
GRIFFIN CITY LIMITS Length: 0.12
LUMP SUM PROJECT
TlP#:
Project: 0003926 Type Work: Intersection Improvement Descp: SR 362 @ CR 231/S. PINE HILL ROAD
LUMP SUM PROJECT
Length: 0.30 TlP#:
Project: 0004587 Type Work: Intersection Improvement Descp: SR 155/US 19/41 BUSINESS AT AIRPORT ROAD/CR
43 Length: 0.26
LUMP SUM PROJECT
TlP#:
Phase Fund
PE
NHS
ROW NHS
CST NHS
Year 2007 After 2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund ROW STP CST STP
Year Underway
2005
Phase Fund
PE
NHS
CST NHS
Year Underway
2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2007 After 2007
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund ROW Local CST STP
Year LOCL LUMP
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Federal $688,000
Federal $775,200
Federal $0
$750,600
Federal $0
$349,200
Federal $0
$1,422,000
Federal $771,200
Federal $1,774,400
Federal $400,000
Federal $0
$243,900
Federal $0
$118,800
Federal $0 $0
$203,754
State $172,000
Other $0
State $193,800
Other $0
State
Other
$0 $83,400
$1,310,000 $0
State
$0 $38,800
Other
$507,600 $0
State
$0 $158,000
Other
$165,400 $0
State $192,800
Other $0
State $443,600
Other $0
State $100,000
Other $0
State
$0 $27,100
Other
$8,000 $0
State $0
$13,200
Other $434,300
$0
State $0 $0
$22,639
Other $0 $0 $0
Total
$860,000
Total
$969,000
Total
$1,310,000
$834,000
Total
$507,600
$388,000
Total
$165,400 $1,580,000 Total
$964,000
Total
$2,218,000
Total $500,000
Total
$8,000 $271,000
Total
$434,300
$132,000
Total
$0
$0
$226,393 Page 260 of300
.'e..','
STATE TRANSPORTATION IMPROVEMENT PROGRAM
Za12QQ5
Spalding
Project: 0005568 Type Work: Replace Bridge Descp: SR 92 @ FLINT RIVER 6.6 MILES W OF GRIFFIN
Length: 0.40 TlP#: SP-009
Project: 323060- Type Work: Replace Bridge
Descp: SR 155/JACKSON ROAD @ CABIN CREEK 2 MI E
OF GRIFFIN
Length: 0.28
TlP#: SP-OII
Project: 331520- Type Work: Passing Lanes Descp: SR 155 NB MP 5.79-6.84ISB 8.5-9.75INB 11.86-12.94
Lanes: Exist. 2 Prop. 4
Length: 338 TIP#: SP-OI2
Project: 331910- Type Work: Replace Bridge
Descp: CR 508/JORDAN HILL RD N/GRIFFIN @
TROUBLESOME CRK
Length: 0.40
TlP#: SP-OI9
Project: 331970- Type Work: Turn Lanes Descp: SR 155@ TEAMON ROADICR 514
Lanes: Exist. 2 Prop. 3 LUMP SUM PROJECT
Length: 0.27 TlP#:
Project: 332520- Type Work: Widening
Descp: SR 16/ARTHUR BOLTON FM REHOBOTH
RD/SPALDING TO 1-75/BUTTS
Lanes: Exist. 2 Prop. 4
Length: 7.64
TIP#: SP-020
Project: 332890- Type Work: Turn Lanes Descp: SR 3IUS 19 TURN LANES AT SR 16 IN GRIFFIN
Lanes: Exist. 4 Prop. 5
Length: 0.33 TIP#: SP-021
Project: 343240- Type Work: Replace Bridge Descp: SR 155@ TOWALIGA RIVER 6.5 MI NE OF GRIFFIN
Length: 0.37 TIP#: SP-025
Project: 343380- Type Work: Replace Bridge
Descp: SR 155@TROUBLESOME CREEK 6 MI NE OF
GRIFFIN
Length: 0.40
TlP#: SP-026A&B
Project: 343460- Type Work: Replace Bridge Descp: CS 797/SIXTH STREET @ SR 155-CS
792-NOR-SOU RR IN GRIFFIN Length: 0.20
TIP#: SP-027
Project: 350710- Type Work: Widening
Descp: CS 877/W MCINTOSH RD/GRIFFIN FM OLD
ATLANTA RD TO US 41/SR 3
Lanes: Exist. 2 Prop. 4
Length: 0.35
TIP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year 2005 After 2007 After 2007
Federal $89,600
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2006
Federal $1,168,800
Phase PE ROW CST
Fund STP STP STP
Year Underway Underway
2006
Federal $2,098,400
Phase Fund
PE
Bridge
CST Bridge
Year 2005 2007
Federal $9,600
$96,800
Slale $22,400
Slale
$292,200 Slate
$524,600 State
$2,400 $24,200
Phase Fund PE STP ROW Local CST STP
Year Underway
LOCL LUMP
Federal
$0 $262,800
State
$0 $29,200
Phase Fund
PE
STP
ROW STP
CST STP
CST STP
Phase PE ROW CST
Fund NHS NHS NHS
Year Underway Underway
2005 2005
Year Underway
2007 After 2007
Federal
$670,332 $17,448,000
Federal $560,000
State
$167,583 $4,362,000
State $140,000
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2006
Federal $1,597,600
State $399,400
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway Underway
2005 2005
Year Underway
LOCL 2007
Federal
$466,867 $400,000 Federal
$0 $2,115,200
State
$116,717 $100,000 State
$0 $528.800
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL Underway
Federal $0
State $0
Other $0
Other
$0 Other
$0 Other
$0 $0
Other $300,000
$0 Other
$0 $0 Other $0
Other
$0 Other
$0 $0 Other $40,000 $0 Other $0
Total $112,000
Total
$1,461,000 Total
$2,623,000 Total $12.000 $121,000
Total $300,000 $292,000 Total
$837,915 $21,810,000
Total $700,000
Total
$1,997,000 Total
$583,584 $500,000 Total
$40,000 $2,644,000
Total $0
Page 261 of 300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM
2al2QQ5
Spalding
Project: 351220-
Type Work: Intersection Improvement
Descp: MACON RDICR 511 AT EAST COLLEGE STICR 253
& FUTRAL RDICR 56
Length: 0.90
LUMP SUM PROJECT
TlP#:
Project: 770321-
Type Work: Rail Projects
Descp: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON)
PHASE 2
Length: 0.00
TlP#: AR26813
Project: MOO1994 Type Work: Bridges
Descp: BRIDGE JACKING @ SEV LOCS IN BUnSISPALDINGjHENRY COUNTIES Length: 1.60
LUMP SUM PROJECT
TlP#: AR311
Project: M002714 Type Work: Resurface & Maintenance
Descp: SR 155 FM E OF NORTH HILL STREET TO
MCDONOUGH ROAD
Length: 5.66
LUMP SUM PROJECT
TlP#:
Project: TOO1364 Type Work: Rail Projects Descp: COMMUTER RAIL ATLANTA/LOVEJOY
(OPERATIONS ASSISTANCE) Length: 0.00
TlP#: AR-268F
Phase PE ROW CST
Fund STP Local STP
Year Underway
LOCL LUMP
Phase Fund CST NHS
Year 2005
Phase Fund
PE
NHS
CST NHS
Year Underway
LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST CMAQ
Year 2006
Federal
$0 $1.183,500
State
$0 $131.500
Other
$300.000 $0
Federal $7,728,000
State $1.932,000
Other $0
Federal $1.200.000
State $300,000
Other $0
Federal $392.000
State $98,000
Other $0
Federal $5.500.000
State $0
Other $1,375,000
Total
$300.000
$1,315,000 Total $9.660.000 Total
$1,500.000 Total
$490,000
Total
$6,875,000
Page262of300
I'.e..''
STATE TRANSPORTA nON IMPROVEMENT PROGRAM 21712005
Stephens
Project: 0000143 Type Work: Streetscapes
Descp: DOWNTOWN TOCCOA STREETSCAPE PROJECT
PHASE III
Length: 0.00
LUMP SUM PROJECT
TlPII:
Phase PE ROW CST
Fund Local Local STP
Project: 0002360 Type Work: Miscellaneous Improvement Descp: TOCCOA TRAIN MUSEUM (ONLY)
Phase Fund CST STP
LUMP SUM PROJECT
Length: 0.00 TIPII:
Project: 0006450 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN HABERSHAM/STEPHENS Length: 0.00
LUMP SUM PROJECT
TlPII:
Phase Fund
PE
STP
CST STP
Project: 121360. Type Work: Bridge Rehab Descp: SR 17 @ OGGS BRANCH
Length: 0.30 TlPII:
Phase Fund
PE
Bridge
CST Bridge
Project: 122260- Type Work: Widening
Descp: SR 17 FROM NW OF CR 13/RUMSEY ROAD TO
MEMORIAL DRIVE
Lanes: Exist. 2 Prop. 4
Length: 4.96
TIPII:
Project: 122670. Type Work: Widening
Descp: SR 17 FROM SR 184/365 SE OF TOCCOA EAST TO
SR 17 ALT.
Lanes: Exist. 2 Prop. 4
Length: 5.35
TIPII:
Project: 132440. Type Work: New Construction
Descp: SR 365ITOCCOA BYP EXT @ SR 17 NE ON NEW
LOC TO SR 365@CR 311
Lanes: Exist. 0 Prop. 4
Length: 5.70
T/PII:
Phase PE PE ROW CST
Fund State Bond Bond Bond
Phase PE PE ROW CST
Fund State Bond Bond Bond
Phase PE ROW ROW CST
Fund STP STP STP STP
Year LOCL LOCL LUMP
Year LUMP
Year Underway
LUMP
Year Underway
2007
Year Underway Underway
2006 2007 Year Underway Underway 2005 2007 Year Underway Underway 2007 After 2007
Federal $0 $0
$250,400
Federal $400,000
State $0 $0 $0
State $0
Federal $504,000
State $126,000
Federal $200,000
State $50,000
Federal
State
$0 $0
Federal
$13,164,000 $12,454,000
State
$0 $0
Federal
$2,415,000 $13,634,000
State
$8,247,200 $2,061,800
Other $0 $0
$62,600 Other $100,000
Other $0
Other $0
Other
$0 $0 Other
$0 $0 Other
$0
Total $0 $0
$313,000
Total $500,000
Total $630,000
Total $250,000
Total
$13,164,000 $12,454,000
Total
$2,415,000 $13,634,000
Total
$10,309,000
Page 263 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM ZaJZ005
Stewart
Project: 0000084 Type Work: Streetscapes Descp: RICHLAND BROAD STREET STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TJPII:
Project: T001286 Type Work: Transit Projects Descp: Regional Transit for Quitman, Clay, Randolph &
Stewart Count Length: 0.00
TJPII:
Phase Fund PE Local ROW Local CST STP
Phase Fund CST Transit
Year LOCL LOCL LUMP
Year 2005
Federal $0 $0
$330,400
Federal $491,330
State $0 $0 $0
State $0
-
Other
$0
$0
$82,600 Other
$98,266
Total $0 $0
$413,000
Total $589,596
Page264of300
I..,~.'' ..:''
STATE TRANSPORTATION IMPROVEMENT PROGRAM
zatZQQ5
Sumter
Project: 0005939 Type Work: Intersection Improvement
Descp: SOUTHERFIELD ROAD @ SR 49 & DISTRICT LINE
ROAD EXTENSION
Length: 5.68
TlPII:
Project: 0006546 Type Work: Bicycle/Ped. Facility
Descp: GA SOUTHWESTERN STATE BIKE &PEDESTRIAN
FACILITIES - PHASE II
Length: 0.00
LUMP SUM PROJECT
TIPII:
Project: 0006549 Type Work: Streetscapes Descp: AMERICUS PEDESTRIAN CORRIDOR - PHASE II
LUMP SUM PROJECT
Length: 0.00 TlPII:
Project: 0006942 Type Work: Water Pollution Mitig. Descp: 400.28 ACRES OF WETLANDS IN
SUMTER-MUCKALEE CREEK MITIGATION Length: 0.00
LUMP SUM PROJECT
TlPII:
Project: 322190- Type Work: Widening
Descp: SR 3!US 19 FM CR 42 TO 0.3 MI N/US 280 (INCL
NEWRR BR)
Lanes: Exist. 2 Prop. 4
Length: 6.34
TlPII:
Project: 322193- Type Work: Bridge Rehab Descp: SR 3!US 19 @ CSX RR SOUTH OF US 280
Lanes: Exist. 2 Prop. 4
Length: 0.40 TlPII:
Project: 322195- Type Work: Widening
Descp: SR 3!US 19 FM LEE CO LINE TO CR 421SUMTER
(INCL BRIDGES)
Lanes: Exist. 2 Prop. 4
Length: 5.50
TlP#:
Project: 322310- Type Work: Replace Bridge Descp: SR 3!US 19 @ BEAR BRANCH S/SR 27
Lanes: Exist. 2 Prop. 4
Length: 0.01 TlP#:
Project: 322780 Type Work: Widening
Descp: SR 27!US 280 FROM SR 45 IN PLAINS TO SR 49
SW OF AMERICUS Lanes: Exist. 2 Prop. 4
Length: 7.85
TlP#:
project: 333085- Type Work: Replace Bridge
Descp: SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S
OF ANDERSONVILLE
Length: 0.93
TIPII:
project: 333195 Type Work: Replace Bridge Descp: SR 27@ LIME CREEK 6.7 MI E OF JCT SR 30
Length: 0.22 TlP#:
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
State
PE
State
ROW RRBS
CST RRBS
Phase Fund
PE
Bridge
CST Bridge
Year Underway Underway
2005 2007
Year Underway
2007
Phase Fund
PE
State
PE
State
ROW RRBS
CST RRBS
Phase Fund
PE
Bridge
CST Bridge
Year Underway Underway
2005 2006
Year Underway
2006
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2006
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2007
Federal $140,000
State $35,000
Federal $500,000
State $0
Federal $240,000
State $0
Federal $2,146,400
State $536,600
Federal
State
$0 $0
Federal
$3,500,000 $11,970,000
State
$856,800
$214,200
Federal
State
$0 $0
Federal
$1,077.000 $12,748,000
State
$172,800
$43,200
Federal $2.013.600
State $503,400
Federal
$40,000 $2.338,400
Federal
$36,000 $1,016,800
State $10,000 $584,600
State $9,000
$254.200
Other $0
Other $125,000
Other $60,000
Other $0
Other
$0 $0 Other $0
Other
$0 $0 Other $0
O'ther $0
Other $0 $0
Other $0 $0
Total $175,000
Total $625,000
Total $300,000
Total $2,683,000
Total
$3,500,000 $11,970,000
Total $1.071.000
Total
$1,077,000 $12,748,000
Total $216.000
Total $2,517,000
Total $50.000 $2,923,000 Total $45.000 $1.271,000
Page 265 of 300
STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM W/2QQ5
Sumter
Project: 333196. Type Work: Replace Bridge
Descp: SR 30 @ MUCKALEE CREEK 0.5 MI WEST OF
AMERICUS
Length: 0.76
TlP#:
Project: 343230- Type Work: Intersection Improvement
Descp: SR 308/BONDS TRAIL RD REALIGNMENT FROM
CR 32 TO CR 140
Length: 0.55
TIP#:
Project: 343410. Type Work: Replace Bridge Descp: SR 195@ LIME CREEK 5 MI N OF JCT SR 30
Length: 0.22 TlP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2007
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 2006
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2007
Federal
$1,992,800
Federal $9,600
$553,600
Federal $36,000
$1,140,800
State
$498,200
State $2,400
$138,400
State $9,000
$285,200
Other
Total
$0 Other $0 $0 Other
$0
$0
$2,491,000
Total $12,000 $692,000
Total $45.000 $1,426,000
Page 266 of 300
I,'..'.-...''' .
'
'..''
STATE TRANSPORTATION IMPROVEMENT PROGRAM zaL2005
Talbot
Project: 0006095 Type Work: Railroad Crossing Descp: CS 530/MONROE STREET @ CSX #6384340
LUMP SUM PROJECT
Length: 0.40 TlP#:
Project: 333210. Type Work: Replace Bridge Descp: SR 36 @ FLINT RIVER 9.6 MI E OF WOODLAND
Lenglh: 0.46 TlP#:
Project: 343110- Type Work: Replace Bridge
Descp: CR 1721POBIDDY ROAD@ FLINT RIVER N OF JCT
SR 221UPSONITALBOT
Length: 0.66
TlP#:
Project: 343405- Type Work: Replace Bridge Descp: SR 240@ BLACK CREEK 2.6 MI S OF GENEVA
Length: 0.48 TIP#:
Project: MOOOB90 Type Work: Miscellaneous Improvement
Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN DISTRICT 3 Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Phase Fund ROW STP CST STP
Year LUMP
Year Underway
2007 After 2007
Year Underway
LOCL 2007
Year Underway Underway
2005
Year Underway
LUMP
Federal $145,000
Federal $1,004,800
Federal $0
$3,136,800 Federal
$651,200 Federal $236,000
State $0
State $251,200
State $0
$784,200 State
$162,800 State $59,000
Other $0
Other $0
Other $40,000
$0 Other
$0 Other
$0
Total $145,000
Total $1,256.000
Total $40,000 $3,921.000 Total
$814,000 Total $295,000
Page 267 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM ZmZQQ5
Taliaferro
Project: 245375- Type Work: Replace Bridge Descp: SR 22 @ SOUTH & NORTH FORKS OGEECHEE
RIV. S OF CRAWFORDVILLE Length: 0.37
TIP#:
Project: 245377- Type Work: Replace Bridge
Descp: SR 47 @ HARDEN CREEK & TRIBUTARY 8 MI NE
OF CRAWFORDVILLE
Length: 0.54
TlP#:
Project: MOO2466 Type Work: Shoulder Work Descp: 1-20RAMPS AT SR 77 AND SR 22
LUMP SUM PROJECT
Length: 0.80 TlP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2005
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Phase Fund CST 1M
Year LUMP
Federal
$1,767,200 Federal
$1,942,400 Federal
$1,078,200
State
$441,800 State
$485,600 State $119,800
Other
Total
$0
Other
$2,209,000 Total
$0
Other
$0
$2.428.000
Total $1,198,000
Page268ot300
.......e:'''''',
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Tattnall
Project: 0001364 Type Work: Replace Bridge
Descp: SR 56/NAIL BRIDGE @ OHOOPEE RIVER 2 MILES
W OF REIDSVILLE
Lenglh: 0.41
TIP#:
Project: 532640. Type Work: Turn Lanes
Descp: SR 30/US 280 FM SR 56 TO ENTRANCE OF
GORDONIA STATE PARK
Lanes: Exist. 2 Prop. 3
Length: 0.68
TlP#:
Project: 533120. Type Work: Replace Bridge
Descp: SR 144 AT WATERMELON CREEK 3 MI W OF
GLENNVILLE
Length: 0.46
TlP#:
Project: 533160. Type Work: Replace Bridge Descp: SR 144 @ BEARD'S CREEK 2 MI E OF GLENNVILLE
Length: 0.58 TlP#:
Project: 571180. Type Work: Replace Bridge
Descp: MIDWAY RDICR 79 @ CEDAR CREEK 2 MI NORTH
OF COLLINS
Length: 0.50
TlP#:
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 After 2007
Federal $3,200
Phase Fund PE STP ROW STP CST STP
Year Underway Underway
2005
Federal $812,800
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2006
Federal
$8,000 $1,149,600
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway
2005
Federal $1,933,600
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2005
Federal
$0 $777,600
State $800
State
$203,200 State
$2,000 $287,400 State
$483,400 State
$0 $194,400
Other $0
Other
$0 Other
$0 $0 Other
$0 Other $10,000
$0
Total $4,000
Total
$1,016,000 Total $10,000
$1,437,000 Total
$2,417,000 Total $10,000 $972,000
Page 269 of 300
STATE TRANSPORTA nON IMPROVEMENT PROGRAM 2t7I2005
Taylor
Project: 0006560 Type Work: Sidewalks
Descp: BUTLER SIDEWALK ALONG SR 137 TO CEDAR
STREET
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 322710. Type Work: Widening
Descp: SR 3IUS 19 FM CR 201/COOPER RD TO BUTLER
BYPASS & NEW LOC Lanes: Exist. 2 Prop. 4
Length: 10.17
TlP#:
Project: 333205- Type Work: Replace Bridge Descp: SR 128 @ FLINT RIVER 8 MI N OF REYNOLDS
Length: 0.94 TlP#:
Project: 343366- Type Work: Replace Bridge
Descp: SR 137@WHITEWATER CREEK TRIB. 7 MI SW OF
BUTLER
Length: 0.40
TlP#:
Phase Fund CST STP
Year LUMP
Phase Fund
PE
State
PE
NHS
ROW Bond
CST Bond
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway Underway
2005
Year Underway
2007 After 2007
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 After 2007
Federal $188.000
State $0
Federal
State
$0 Federal
$27,413,000 State
$31.200
$7.800
Federal $27.200
State $6.800
Other
$47.000
Total $235,000
Other
Total
$0
Other $0
$27.413.000 Total $39.000
Other
$0
Total $34.000
Page 270 of 300
......''....'''''''''
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2012005
Telfair
Project: 0002366 Type Work: Bicycle/Ped. Facility
Descp: JACKSONVILLE PEDESTRIAN FACILITIESPHASE II Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 531100- Type Work: New Construction
Descp: S MCRAE BYP FM SR 31/US 441 NE TO SR 27/US
341 @ N.MCRAE BYP
Lanes: Exist. 0 Prop. 4
Length: 2.55
TlP#:
Project: 542395- Type Work: Replace Bridge
Descp: SR 117 @ BIG HORSE CREEK 9.2 MI E OF
JACKSONVILLE
Length: 0.40
TlP#:
Project: 561470- Type Work: New Construction
Descp: N MCRAE BYP FM US 341/S BYP TO US
441IWHEELERJINCL SIGNALS
Lanes: Exist. 0 Prop. 4
Length: 2.80
TlP#:
Phase Fund CST STP
Year LUMP
Federal $78,940
State $0
Phase Fund
PE State
PE
Bond
ROW Bond
CST Bond
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2006 After 2007
Year Underway
2005 After 2007
Phase Fund PE State PE Bond ROW State ROW Bond CST Bond
Year Underway Underway Underway
2006 After 2007
Federal
State
$0 Federal
$16,000
$767.000 State
$4,000
Federal
State
$0
$491.000
Other $19,735
Other $0
Other $0
Other
$0
Total $98,675
Total $767.000 Total
$20,000
Total
$491,000
Page 271 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Terrell
Project: 0000452 Type Work: Replace Bridge Descp: CR 164/SASSERHEROD ROAD @ BRANTLEY
CREEK WEST OF SASSER Length: 0.22
TIP#:
Project: 0000453 Type Work: Replace Bridge Descp: CR 164/SASSER-HEROD ROAD @
CHICKASAWHATCHEE CREEK Length: 0.55
TIP#:
Project: 0000454 Type Work: Replace Bridge
Descp: CR 11/BELLFLOWER ROAD @ HEROD CREEK 3.5
MI S'l',jOF DAVVSON
Length: 0.16
TIP#:
Project: 431410. Type Work: Minor Widen & Resurf Descp: SR 49 FM SR 45 FOR APPROX. 3 MILES TO
CORRECT HORIZ ALIGN. Length: 2.98
TIP#:
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2006
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2006
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2005
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2005 After 2007
Federal $0
$612,000
Federal $0
$580,000
Federal $0
$206,400
Federal $44,800
State $0
$153,000
State $0
$145,000
State $0
$51,600
State $11,200
Other $0 $0
Other $0 $0
Other $10,000
$0
Other $0
Total $0
$765,000 Total
$0 $725,000 Total
$10,000 $258,000 Total
$56,000
Page 272 of 300
e
'.
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Thomas
Project: 0001363 Type Work: Replace Bridge Descp: SR 3 ALT @ OCHLOCKNEE RIVER APP 9 MI N OF
JCT SR 38 Length: 0.40
TIP#:
Project: 0001570 Type Work: Turn Lanes Descp: SR 300/US 19 MED TN LANES FM S OF
THOMASVILLE TO MITCHELL CO Length: 20.42
TIP#:
Project: 0005832 Type Work: Intersection Improvement Descp: SR 188 AT CR 124/ROCKY FORD ROAD
Length: 0.40 TIP#:
Project: 0005882 Type Work: Turn Lanes
Descp: SR 38 BUS/US 84@ HANSELL ST 1.05 MI N OF SR
35 THOMASVILLE
Length: 0.24
LUMP SUM PROJECT
TIP#:
Project: 0006550 Type Work: Streetscapes Descp: DOWNTOWN THOMASVILLE - PHASE II
LUMP SUM PROJECT
Length: 0.00 T1P#:
Project: 421970- Type Work: Replace Bridge
Descp: SR 38/US 84 BUS @ GA-FLA RAIL NET INC
NWITHOMASVILLE
Length: 0.28
T1P#:
Project: 442965- Type Work: Replace Bridge
Descp: SR 33 @ REEDY CREEK APP 0.8 MI SOUTH OF
PAVO
Length: 0.30
T1P#:
Project: 470695 Type Work: Replace Bridge
Descp: CR 40/0LD QUITMAN ROAD @ MASSE BRANCH
TRIB. N OF BOSTON
Length: 0.20
T1P#:
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 After 2007
Federal $22,400
State $5,600
Phase Fund
PE
NHS
CST NHS
Year Underway
2007
Federal $11,632,800
State $2,908.200
Phase PE ROW CST
Fund STP STP STP
Year 2006 After 2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase Fund CST STP
Year LUMP
Federal $30,400
Federal $1,466,100
$237,600
Federal $500,000
State $7,600
State $162,900
$26,400
State $0
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2006
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2007
Federal
$3,974,400
Federal $10,400
$516,000
Federal $0
$146,400
State
$993,600
State $2,600
$129.000
State $0
$36,600
Other $0
Other $0
Other $0
Other $0 $0
Other $125,000
Other
$0 Other
$0 $0 Other $0 $0
Total $28.000
Total $14.541,000
Total $38.000
Total $1,629,000
$264,000 Total $625,000
Total
$4,968.000 Total $13,000 $645,000 Total $0 $183.000
Page 273 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM
zaJ2QQ5
Tift
Project: 0000803 Type Work: Widening
Descp: 1-75 FM N CITY LIMITS OF TIFTON TO TURNER CO
LINE - PHASE 2
Lanes: Exist. 4 Prop. 6
Length: 8.00
TlP#:
Project: 0003094 Type Work: Replace Bridge
Descp: CR 411/SCOOTERVILLE ROAD @ TY TY CREEK 6.5
MI NW OF OMEGA
Length: 0.76
TIP#:
Project: 0003385 Type Work: Water Pollution Mitig.
Descp: 1-75STREAM MITIGATION IN TIFT; TURNER &
CRISP COUNT!ES
Length: 0.00
TlP#:
Project: 0003430 Type Work: Widening
Descp: CARPENTER RDICR 75 IN TIFTON FM SR 520lUS
82 TO DAVIS RD
Lanes: Exist. 2 Prop. 5
Length: 2.50
TlP#:
Project: 0006073 Type Work: Widening Descp: 1-75 FM COOK COUNTY LINE TO CR 204 - PHASE 1
Lanes: Exist. 4 Prop. 6
Length: 6.24 TlP#:
Project: 0006551 Type Work: Multi-use Trail Descp: ABAC PEDESTRIAN MALL
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006552 Type Work: Sidewalks Descp: OAK STREET SIDEWALKS AND STREETLIGHTS
LUMP SUM PROJECT
Length: 0.00 TlP#:
Phase Fund
PE
NHS
ROW NHS
CST Bond
Year 2005 After 2007 After 2007
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2006
Phase Fund CST NHS
Year 2007
Federal $2,400,000
Federal $0
$1,128,000
Federal $145,600
State $600,000
State $0
$282,000
State $36,400
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL 2007
Phase Fund
PE
NHS
CST Bond
Year 2005 2007
Federal
$0 $3,703,200
State
$0 $925,800
Federal $400,000
$0
State $100,000 $42,700,000
Phase Fund CST STP
Year LUMP
Federal $500.000
State $0
Phase Fund CST STP
Year LUMP
Federal $91,200
State $0
Other $0
Other $10,000
$0 Other
$0
Other $40,000
$0 Other
$0 $0
Other $125,000
Other $22,800
Total $3,000,000
.,
Total $10,000
$1,410,000
Total
$182.000 Total $40,000 $4,629,000 Total $500,000
$42,700,000
Total
$625,000 Total $114,000
Page 274 of 300
.'
..1J
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I2QQ5
Toombs
Project: 0003902 Type Work: Descp: SR 4 @ SR 178
Intersection Improvement
LUMP SUM PROJECT
Length: 0.10 TlP#:
Project: 0006561 Type Work: Multi-use Trail Descp: LYONS RAILS TO TRAILS
LUMP SUM PROJECT
Length: 0.00 TIP#:
Project: 522130- Type Work: Widening
Descp: SR 4IUS 1 FM LYONS CL TO SOUTH CUOAK PARK
IN EMANUEL CO Lanes: Exist. 2 Prop. 4
Length: 9.20
TlP#:
Project: 522200- Type Work: Widening
Descp: SR 4 LYONS FM S CTY LMTS TO N CTY LMTS/lNCL
1-WY PAIR&CLVT Lanes: Exist. 2 Prop. 4
Length: 3.10
TlP#:
Project: 542415- Type Work: Replace Bridge Descp: SR 56 @ ROCKY CREEK 13 MI SE OF LYONS
Length: 0.80 TlP#:
Project: 542416. Type Work: Replace Bridge Descp: SR 147 @ COBB CREEK 17 MI S OF LYONS
Length: 0.49 TlP#:
Project: 550610 Type Work: Turn Lanes
Descp: SR 292NIDALIA FM MORN'SIDE - LOWERY WITH
RIGHT ON WILSON Lanes: Exist. 2 Prop. 3
Length: 1.32
TlP#:
Phase Fund ROW STP CST STP
Year LUMP LUMP
Phase Fund CST STP
Year LUMP
Phase PE PE ROW CST
Fund State Bond Bond Bond
Phase PE PE ROW CST
Fund Stale Bond Bond Bond
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway Underway
2007 After 2007
Year Underway Underway
2007 After 2007
Year Underway Underway
2005
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2006
Phase PE ROW CST
Fund STP STP STP
Year Underway
2005 2007
Federal $88,650
$148,500
State $9,850
$16,500
Federal $650,400
State $0
Federat
State
$0
$2,750,000
Federat
State
$0 $15,940,000
Federal
State
$1,277,600
Federal $8,000
$1,113,600
Federal $400,000 $2,432,000
$319,400
State $2,000
$278,400
State $100,000 $608,000
Other $0 $0
Other $162,600
Other
$0 Other
$0 Other
$0 Other
$0 $0 Other $0 $0
Total $98,500 $165,000
Total $813,000
Total
$2,750,000 Total
$15,940,000 Total
$1,597,000 Total $10,000
$1,392,000 Total $500,000
$3,040,000
Page 275 of 300
STATE TRANSPORTATlON IMPROVEMENT PROGRAM 2!7I2QQ5
Towns
Project: 0000301 Type Work: Replace Bridge
Descp: SR 17- SR 75 @ HIAWASSEE RIVER 6.5 MI S OF
HIAWASSEE
Length: 0.22
TlP#:
Project: 0000302 Type Work: Replace Bridge
Descp: SR 17- SR 75 @ HIAWASSEE RIVER 3.6 MI S OF
HIAWASSEE
Length: 0.22
TlP#:
Project: 0000303 Type Work: Replace Bridge
Descp: SR 2JUS 76 @ HIGHTOWER CREEK 6.1 MI E OF
HiA'vVASSEE
Length: 0.22
TIP#:
Project: 0000304 Type Work: Replace Bridge
Descp: SR 66 @ BRASSTOWN CREEK .5 MI NW OF
YOUNG HARRIS
Length: 0.22
TlP#:
Project: 0000305 Type Work: Replace Bridge
Descp: SR 66 @ CROOKED CREEK 3.2 MI NW OF YOUNG
HARRIS
Length: 0.22
TlP#:
Project: 0002100 Type Work: New Construction Descp: TOWNS COUNTY APPALACHIAN ACCESS ROAD
PROGRAM Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0002369 Type Work: Sidewalks Descp: HIAWASSEEITOWNS COUNTY SIDEWALK
EXPANSION AND ENHANCEMENT PR Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 132710- Type Work: Widening
Descp: SR 515 FM SR 2 N OF HIAWASSEE TO THE N
CAROLINA LN/CORR A
Lanes: Exist. 2 Prop. 4
Length: 1.13
TIP#:
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund CST APD
Year Underway
2006 2007 2007
Year Underway
2005 2006 2006
Year Underway
2006 After 2007 After 2007
Year Underway
2006 After 2007 After 2007
Year Underway
2006 2007 2007
Year LUMP
Federal
$48,000 $488,000 $488,000 Federal
$48,000 $506,000 $506,000 Federal
$48,000
State
$12,000 $122,000 $122,000 State
$12,000 $126,500 $126,500 State
$12,000
Federal $44,160
State $11,040
Federal
$44,160 $350,000 $350,000 Federal $524,800
State
$11,040 $87.500 $87,500
State $0
Phase Fund CST STP
Year LUMP
Federal $277,222
State $0
Phase Fund
PE
APD
ROW App Dev
CST AppDev
Year Underway
2006 2007
Federal
$1,657,600 $940,800
State
$414,400 $235.200
Other $0 $0 $0
Other $0 $0 $0
Other $0
Other $0
Other $0 $0 '$0
Other $131,200
Other $69,306
Other $0 $0
Total $60,000 $610,000
$610,000
Total $60,000 $632,500
$632,500
Total $60,000 Total $55,200 Total $55.200 $437,500
$437,500
Total $656.000 Total
$346,528
Total $2,072,000 $1,176.000
Page 276of300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Treutlen
Project: 0006451 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN
EMANUELfTREUTLEN Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: M002428 Type Work: Bridges
Descp: SR 46 OVER THE OCONEE RIVER BRIDGE 10#309-0016-0 Length: 0.40
LUMP SUM PROJECT
TIP#:
Phase Fund PE STP CST STP
Year Underway
LUMP
Phase Fund CST PR
Year LUMP
Federal $392,000
State $98,000
Federal $0
State $100,000
Other $0
Other $0
Total $490,000
Total $100.000
Page 277 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Troup
Project: 0002382 Type Work: Landscaping
Descp: LANDSCAPING ON 1185 IN HARRIS AND TROUP
COUNTIES
Length: 34.81
LUMP SUM PROJECT
T1P#:
Project: 0003787 Type Work: Ramp Descp: 1-85 EXIT RAMPS AT SR 18
LUMP SUM PROJECT
Length: 0.27 T1P#:
Project: 0006488 Type Work: Railroad Crossing Descp: CR 263/GREEN STREET @ CSX #050468T
LUMP SUM PROJECT
Length: 0.20 T1P#:
Project: 0006828 Type Work: Multi-use Trail
Descp: YOUNG'S MILL BRIDGE PEDESTRIAN & BICYCLE
TRAIL
Length: 0.00
LUMP SUM PROJECT
T1P#:
Project: 0006629 Type Work: Slreelscapes
Descp: WEST POINT PEDESTRIAN ENHANCEMENT
PROJECT
Length: 0.00
LUMP SUM PROJECT
T1P#:
Project: 0006630 Type Work: Slreelscapes Descp: HOGANSVILLE STREETSCAPE - PHASE II
LUMP SUM PROJECT
Length: 0.00 T1P#:
Project: 321715- Type Work: Widening
Descp: SR 14/US 29 FM CR 403/UPPER GLASS BRIDGE
TO OLD VERNON RD
Lanes: Exist. 2 Prop. 4
Length: 3.05
TIP#:
Project: 322250- Type Work: Widening
Descp: SR 1IUS 27/LAGRANGE FM AUBURN ST TO SR
219IMORGAN ST
Lanes: Exist. 2 Prop. 4
Length: 1.42
T1P#:
Project: 343190- Type Work: Replace Bridge Descp: CS 769/JEFFERSON STREET @ CSX RAILROAD IN
WEST LAGRANGE Length: 0.21
TlP#:
Project: 351170- Type Work: Turn Lanes
Descp: SR 14/US 29 LEFT TURN LANE FROM MEADOW
WAY DR TO SR 14 SPUR
Lanes: Exist. 2 Prop. 3
Length: 0.92
TIP#:
Project: MOO0890 Type Work: Miscellaneous Improvement Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN
DISTRICT 3 Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund CST STP
Phase Fund
PE
STP
CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund PE NHS ROW NHS CST NHS
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Phase Fund
PE
STP
ROW STP
CST STP
Phase Fund ROW STP CST STP
Year LUMP
Year Underway
LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year Underway
2007 After 2007
Year Underway
2005 After 2007
Year Underway
LOCL 2005
Year Underway
2005 2005
Year Underway
LUMP
Federal $449,600
Federal $108,000
Federal $150,000
Federal $160,000
Federal $500,000
Federal $200,000
Federal $2,454,400
Federal $14,288,000
Federal $0
$640,000 Federal $629,600 $1,180,000 Federal $236,000
State $112,400
State $12,000
State $0
State $0
State $0
State $0
State $613,600
State $3,572,000
State $0
$160,000 State $157,400 $295,000 State $59,000
Other $0
Other $0
Other $0
Other $40,000
Other $125,000
Other $50,000
Other $0
Other $0
Other $20,000
$0 Other
$0 $0 Other $0
Total
$562,000
Total
$120,000
Total
$150,000
e Total
$200,000
Total
$625,000
Total
$250,000
Total $3.068,000 Total $17,860,000 Total $20.000 $800,000
Total
$787,000 $1,475.000 Total
$295,000
Page 278 of300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Troup
Project: M002969 Type Work: Guardrail Descp: 1-185 FM CS 22491WILLIAMS RD/MUSCOGEE TO
SR 1ITROUP Length: 30.32
LUMP SUM PROJECT
TIP#:
Phase Fund
PE
1M
CST 1M
Year LUMP LUMP
Federal $1,800,000 $43,200,000
State $200,000 $4,800,000
Other $0 $0
Total $2,000,000 $48,000,000
Page279 of 300
STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM 2t7/2005
Turner
Project: 0000804 Type Work: Widening Descp: 1-75 FM TIFT COUNTY LINE TO SR 159 - PHASE 2
Lanes: Exist. 4 Prop, 6
Length: 11.30 TIP#:
Project: 0000805 Type Work: Widening
Descp: 1-75 FM SR 159 NR ASHBURN TO SR 300/CRISP CO
- PHASE 2 Lanes: Exist. 4 Prop. 6
Length: 14.50
TJP#:
Project: 0003385 Type Work: Water Pollution Mitig. Descp: 1-75STREAM MITIGATION IN TIFT; TURNER &
CRISP COUNTIES Length: 0.00
TJP#:
Project: 0004798 Type Work: Widening
Descp: SR 32 FROM EAST OF 1-75/TURNER TO SR
125/1RWIN
Lanes: Exist. 2 Prop. 4
Length: 10.34
TJP#:
Project: 0005927 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VAR LOCS IN
BEN HILLITURNERIWORTH
Lanes: Exist.
Prop.
Length: 0.00
LUMP SUM PROJECT
TJP#:
Project: 0006016 Type Work: Widening Descp: 1-75FROM SR 32 TO SR 159
Lanes: Exist. 4 Prop. 6
Length: 6.15 TJP#:
Project: 410245-
Type Work: Widening
Descp: 1-75 FM TIFT COUNTY LINE TO SR 32
Lanes: Exist. 4 Prop. 6
Length: 5.11 TJP#:
Project: 442980.
Type Work: Replace Bridge
Descp: SR 112 @ DEEP CREEK 4.6 MI E OF ASHBURN
Length: 0.41 TJP#:
Project: MOO0743 Type Work: Miscellaneous Improvement Descp: SR 7!US 41 AT EAST COLLEGE AVE
LUMP SUM PROJECT
Length: 0.47 TIP#:
Phase PE ROW CST
Fund NHS NHS Bond
Phase PE ROW CST
Fund NHS Bond Bond
Phase Fund CST NHS
Phase Fund
PE
State
ROW State
CST State
Phase Fund CST STP
Phase Fund ROW NHS CST NHS
Phase PE ROW CST
Fund NHS NHS Bond
Phase PE ROW CST
Fund Bridge Bridge Bridge
Phase Fund PE STP CST STP
Year 2005 2006 After 2007
Year 2005 2006 After 2007
Year 2007
Year 2005 After 2007 After 2007
Year LUMP
Year 2005 2005
Year Underway
2005 2005
Year Underway Underway
2005
Year Underway
LUMP
Federal $400,000 $7,124,000
State $100,000 $1,761,000
Federal $2,400,000
$0
State $600,000 $11,604,000
Federal $145,600
State $36,400
Federal $0
Slate $966,000
Federal $1,040,000
State $260,000
Federal $142,600 $26,160,800
Slate $35,700 $6,540,200
Federal
Slale
$40,000 $0
$10,000 $21,059,000
Federal
State
$1,664,000 Federal $349,600
$416,000 State $87,400
Other $0 $0
Total $500,000 $6,905,000
Other $0 $0
Total $3,000,000 $11,604,000
Other $0
Total $162,000
.
Other $0
Other $0
Olher $0 $0
Other $0 $0
Other
$0 Other
$0
Tolal
$966,000 Total
$1,300,000
Total $178,500
$32,701,000
Total
$50,000
$21,059,000
Total
$2,080,000
Total
$437,000
Page 280 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Twiggs
Project: 0000813 Type Work: Widening
Descp: SR 87IUS 23 FROM SR 96ITWIGGS TO 1-16 IN BIBB
COUNTY Lanes: Exist. 2
Prop. 4
Length: 19.96
TIP#: MCN-42
Project: MOO2902 Type Work: Resurface & Maintenance Descp: SR 18 FM SR 18 SPURIWILKINSON TO RAILROAD
TRACKITWIGGS Length: 14.38
LUMP SUM PROJECT
TlP#:
Phase Fund
PE
STP
ROW STP
CST STP
Year 2005 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Federal $256,000
Federal $1,830,400
State $64,000
State $457,600
Other $0
Other $0
Total $320,000
Total $2,288,000
Page 281 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2a/2QQ5
Union
Project: 0001918 Type Work: Intersection Improvement
Descp: SR 11/US 129@CR 1DO/PAT COLWELL &@CR
221PAT HARRALSON DR Length: 0.60
LUMP SUM PROJECT
TlP#:
Project: 132180- Type Work: Replace Bridge Descp: CR 341 @ NOTTLEY RIVER SW OF BLAIRSVILLE
Length: 0.50 TlP#:
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase Fund PE Bridge ROW Local CST Bridge
Year Underway
LOCL 2006
Federal
$13,500 $336,600
Federal
$0 $958,400
State $1,500
$37,400
State
$0 $239,600
Other
$0 $0
Other
$60,000 $0
Total
$15,000 $374,000
Total
$60,000 $1,198,000
.
Page282of300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2!7I2QQ5
Upson
Project: 0000297 Type Work: Widening Descp: SR 3/US 19 FM N OF POTATO CK TO ATWATER
RDICR 8 IN THOMASTON Length: 2.47
TfP#:
Project: 322550- Type Work: Widening
Descp: SR 74 FM HOLSTUN DR TO TRICE ROAD IN
THOMASTON
Lanes: Exisl. 2 Prop. 5
Lenglh: 1.42
TIP#:
Project: 322920- Type Work: Intersection Improvement Descp: SR 3/US 19 AT CR 73/EAST AND WEST COUNTY
ROAD IN THOMASTON Length: 0.20
TlP#:
Project: 322922- Type Work: Replace Bridge Descp: SR 3/US 19 @POTATO CREEK IN THOMASTON
Lanes: Exisl. 4 Prop. 5
Length: 0.23 TlP#:
Project: 333210- Type Work: Replace Bridge Descp: SR 36 @ FLINT RIVER 9.6 MI E OF WOODLAND
Length: 0.46 TlP#:
Project: 343110 Type Work: Replace Bridge
Descp: CR 1721POBIDDY ROAD@ FLINT RIVER N OF JCT
SR 221UPSONITALBOT
Length: 0.66
TlP#:
Project: MOO0890 Type Work: Miscellaneous Improvement
Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN
DISTRICT 3
Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund PE NHS ROW NHS CST NHS
Phase Fund PE STP ROW STP CST STP
Phase PE ROW CST
Fund NHS NHS NHS
Phase Fund PE Bridge ROW Bridge CST Bridge
Phase Fund PE Bridge ROW Bridge CST Bridge
Phase Fund PE Bridge ROW Local CST Bridge
Phase Fund ROW STP CST STP
Year 2007 After 2007 After 2007
Year Underway Underway
2005
Year Underway
2007 After 2007
Year Underway
2007 After 2007
Year Underway
2007 After 2007
Year Underway
LOCL 2007
Year Underway
LUMP
Federal $536,000
Federal
$2,560,800 Federal
$10,608,000
Federal $22,400
Federal $1,004,800
Federal $0
$3,136,800 Federal $236,000
State $134,000
State $640,200 State $2,652,000
State $5,600
State $251,200
State $0
$784,200 State $59,000
Other $0
Total $670,000
Other
Total
$0
$3,201,000
Other $0
Total $13,260,000
Other $0
Total $28,000
Other $0
Total $1,256,000
Other $40,000
$0
Other $0
Total $40,000
$3,921,000
Total $295,000
Page 283 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM waDD5
Walker
Project: 0000144 Type Work: Streetscapes Descp: ROSSVILLE-CHICKAMAUGA AVE STREETSCAPE
LUMP SUM PROJECT
Length: 0.00 TIP#: TE-144
Project: 0003452 Type Work: Replace Bridge Descp: CR 835/HAPPY VALLEY RD @ CHATTANOOGA CK
4 MI SW OF ROSSVILLE Length: 0.09
TlP#:
Project: 0003453 Type Work: Replace Bridge
Descp: CR 835/HAPPY VALLEY ROAD @ CHATTANOOGA
CREEK OVF=RI=LOW
Length: 0.09
TlP#:
Project: 0003776 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCS ALONG SR 52 AND SR 2 Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0004266 Type Work: Widening Descp: SR 1IUS 27.FM SR 151 TO LAFAYETTE BYPASS
Lanes: Exist. 2 Prop. 4
Length: 7.04 TIP#:
Project: 0005571 Type Work: Replace Bridge Descp: SR 136@WESTCHICKAMAUGACREEK5.7 M SW
OF LAFAYETTE Length: 0.20
TlP#:
Project: 0006617 Type Work: Streetscapes
Descp: HISTORIC DOWNTOWN CHICKAMAUGA STREETSCAPE PROJECT Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0006951 Type Work: Multi-use Trail Descp: LULA LAKE ROAD PEDESTRAIN PATHWAY
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 621610. Type Work: Widening
Descp: SR 1/US 27 FM HARRELL ST/CR 331 IN TRION TO
SR 151/WALKER CO
Lanes: EXist. 2 Prop. 4
Length: 4.72
TlP#:
Project: 650530. Type Work: Widening
Descp: CR 704/MCFARLAND AVE FROM SR 2 TO SALEM
ROAD/CR354
Lanes: Exist. 2 Prop. 4
Length: 0.97
TlP#: STP-98(8)
Project: 671216. Type Work: Bicycle/Ped. Facility
Descp: CHATTANOOGA CREEK GREENWAY MULTI-USE TRAILS & BRIDGE REHAB Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund
PE
Local
ROW Local
CST STP
Year LOCL LOCL LUMP
Phase PE ROW CST
Fund Bridge Local Bridge
Year Underway
LOCL 2007
Phase Fund
PE
Bridge
ROW Local
CST Bridge
Year Underway
LOCL 2007
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $0 $0
$1.000.000
Federal
$0 $259,200
Federal
$0 $396,000
Federal
$884,000
State $0 $0 $0
State
$0 $64,800
State
$0 $99,000
State
$221,000
Phase PE ROW CST
Fund State State Bond
Year Underway Underway
2005
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year 2005 After 2007 After 2007
Phase Fund CST STP
Year LUMP
Federal
State
$0 $20,600,000
Federal $77,600
State $19,400
Federal $600,000
State $0
Phase Fund CST STP
Year LUMP
Federal $136,000
State $0
Phase Fund PE State ROW State CST Bond
Year Underway Underway
2005
Phase Fund PE STP ROW Local CST STP
Year 2005 LOCL After 2007
Phase Fund PE Local ROW Local CST STP
Year LOCL LOCL LUMP
Federal
State
$0 $16,500,000
Federal $60,000 $0
State $15.000
$0
Federal $0 $0
$80,000
State $0 $0 $0
Other $0 $0
$250,000
Other $13,500
$0
Other $16,000
$0
Other $0
Other
$0
Other $0
Other $150,000
Other $34,000
Other
$0
Other $0 $0
Other $0 $0
$20.000
Total
$0
$0
$1.250.000 Total
$13.500
$324.000
Total
$16,000
$495,000 Total $1.105,000 Total
$20,600,000 Total
$97,000
Total
$750,000
Total
$170,000 Total $16,500.000
Total $75.000
$0
Total $0
$0
$100,000 Page 284 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM zaJ2QQ5
Walker
Project: M002542 Type Work: Resurface & Maintenance Descp: SR 136 FROM SR 1/WALKER TO SR 136
CONN/GORDON Length: 19.99
LUMP SUM PROJECT
TlP#:
Phase Fund CST STP
Year LUMP
Federal $1,040,000
State $260,000
Other $0
Total $1,300.000
Page 285 of 300
STATE TRANSPORTA TION IMPROVEMENT PROGRAM 2aI2QQ5
Walton
Project: 0000412 Type Work: Intersection Improvement Descp: SR 10IUS78@SPRING ST/SR lOBUS-ADD WB
RAMPS/UPGRD INTERCHNGE Length: 0.20
TIP#:
Project: 0000413 Type Work: Widening
Descp: SR 11 FM N OF SOCIAL CIR BY l-WAY PAIR IN
MONROE TO CO. LINE Lanes: Exist. 0 Prop. 4
Length: 16.00
TIP#:
Project: 0000414 Type Work: Widening
Descp: SR 138 WIDENING FM NEWTON CTY LN TO SR
4nlllC" "7D IVIV,,",IU
Lanes: Exist. 0
Prop. 4
Length: 12.00
TIP#:
Project: 0000415 Type Work: Widening
Descp: WIDEN SR 10/US 78 FM GWINNETT CTY LN TO SR
10 BU IN MONROE Lanes: Exist. 4 Prop. 6
Length: 9.78
TlP#:
Project: 0000416 Type Work: Widening
Descp: SR 20 FM SHARON CHURCH RD TO PLEASANT
HILL RD
Lanes: Exist. 2 Prop. 4
Length: 4.29
TlP#: AR-919
Project: 0002019 Type Work: Intersection Improvement Descp: SR 81 AT CLAUDE AND TOM BREWER ROADS/CR
88 Length: 0.40
LUMP SUM PROJECT
TlP#:
Project: 0004644 Type Work: Widening
Descp: SR 20ILOGANVILLE HIGHWAY FM OZORA RD TO
SR81
Lanes: Exist. 2 Prop. 4
Length: 3.64
TIP#: GW-020FI&
Project: 0004708 Type Work: Sidewalks Descp: SOCIAL CIRCLE PEDESTRIAN AND BICYCLE
TRAILWAYS Length: 2.80
LUMP SUM PROJECT
TIP#:
Project: 0007103 Type Work: New Construction
Descp: SR 138 EXTENSION FM SR 10/US 78 TO SR
11/MONROE CITY LIMITS
Lanes: Exist. 0 Prop. 2
Length: 0.00
TlP#: WA-026
Project: 132980- Type Work: Replace Bridge Descp: SR 11 @ CSX RAILROAD IN SOUTH SOCIAL
CIRCLE Length: 0.23
TIP#:
Project: 132981. Type Work: Replace Bridge Descp: SR 11 @ APALACHEE RIVER 7.5 MILES NORTH OF
MONROE Length: 0.57
TIP#:
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway
2006 After 2007
Phase Fund PE STP ROW STP CST STP
Year 2007 After 2007 After 2007
Phase Fund
PE
STP
ROW STP
CST STP
Year 2007 After 2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year 2007 After 2007 After 2007
Phase Fund
PE sip
ROW STP
CST STP
Year After 2007 After 2007 After 2007
Phase Fund
PE
STP
ROW Local
CST STP
Year Underway
LOCL LUMP
Phase Fund
PE
Bond
ROW STP
ROW Bond
CST STP
CST Bond
Phase Fund
CST STP
Year Underway
2005 2005 2006 2006 Year LUMP
Phase Fund PE Local ROW Local CST STP
Year LOCL LOCL 2006
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
CST STP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2006 After 2007 After 2007
Year Underway
2006 After 2007
Federal $800,000
State $200,000
Other $0
Federal $3,144,800
State $786.200
Other $0
Federal $1,796,800
State $449,200
Other $0
Federal $1,684,800
State $421.200
Other $0
Federal
State
Other
Federal
$0 $668,700
State
$0 $74,300
Other
$300,000 $0
Federal
$212,000 $0
$560,000 $0
Federal $400,000
State
$53,000 $1,750,000
$140,000 $4.550,000
State $0
Other
$0 $0 $0 $0 Other $100,000
Federal $0 $0
$1,000.000
Federal
$16,000
State $0 $0 $0
Other $300,000 $650,000 $2,200,000
State $4,000
Other $0
Federal $10,400
State $2,600
Other $0
Total
$1.000,000
Total
$3,931.000
Total
$2,246,000
Total
$2.106.000
Total Total
$300,000
$743,000
Total
$265,000 $1.750,000
$700,000
$4,550,000 Total $500,000 Total $300,000 $650,000
$3.200,000
Total $20,000
Total
$13.000
Page 286 of300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Walton
Project: 132982- Type Work: Bridge Rehab Descp: SR 10lUS 78 WBL @ APALACHEE RIVER 4 MI E OF
GRATIS Length: 0.28
TIP#: WA-OI4
Project: 142000- Type Work: Widening
Descp: SR 20 FM ROSEBUD RD TO SR 81 IN LOGANViLL
INCL 1 WAY PAIR
Lanes: Exist. 2 Prop. 5
Length: 5.50
TlP#: WA-02\
Project: 142295- Type Work: Replace Bridge
Descp: SR 81 @ ALCOVY RIVER 1 MI SW OF BOLD
SPRINGS
Length: 0.61
TlP#: WA-OI5
Project: 142296- Type Work: Replace Bridge
Descp: SR 81 @APALACHEE RIVER 1.5 MI NE OF BOLD
SPRINGS
Length: 0.43
TIP#: WAOI6
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 After 2007
Federal $10,400
State $2,600
Phase Fund PE STP ROW STP CST STP
Year Underway
2006 After 2007
Federal $4,491,200
State $1,122,800
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 2006
Federal
$240,000 $1,219,200
State
$60,000 $304,800
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2007 After 2007
Federal $8.000
State $2,000
Other $0
Other $0
Other $0 $0
Other $0
Total $13,000
Total $5,614,000
Total $300,000 $1,524,000 Total
$10,000
Page 287 of 300
STATE TRANSPORTA nON IMPROVEMENT PROGRAM 2f7I2QQ5
Ware
Project: 0006441 Type Work: Replace Bridge Descp: CR 467/BICKLEY HIGHWAY@ CANE CREEK
Length: 0.40 TlP#:
Project: 522780. Type Work: Widening
Descp: SR 38/US 84 FM CR 79/NEEDHAM RD TO SR 38 @
SR 50/US 82 Lanes: Exist. 2 Prop. 4
Length: 5.60
TlP#:
Phase Fund PE Bridge ROW Local CST Bridge
Year 2005 LOCL Atter2007
Phase Fund
PE
State
ROW State
ROW HPP
CST State
Year Underway Atter2007
2007 Atter2007
Federal $28,000 $0
State $7,000 $0
Federal
State
$4,000,000
$1,000,000
Other
$0
$50.000
Total $35.000 $50.000
Other
Total
$0
$5.000.000
Page 288 of 300
.'
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zmZOO5
Warren
PrOject: 0006420 Type Work: Barriers
Descp: 1-20 FM SR 80 TO RICHMOND COUNTY - CABLE
MEDIAN BARRIERS
Length: 29.52
LUMP SUM PROJECT
TIP#:
Project: 0006640 Type Work: Historic Facilities
Descp: WARREN COUNTY DEPOT REHABILITATION AND
STREETSCAPE
Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 232220- Type Work: Railroad Crossing
Descp: SR 12/E WARRENTON @ SOUTHERN RR
BRID;REMOVE & REPL W/@-GRADE
Lanes: Exist. 2 Prop. 4
Length: 0.40
TIP#:
Phase Fund
PE
STP
CST STP
Year Underway
LUMP
Federal $2.104.200
State $233.800
Phase Fund CST STP
Year LUMP
Federal $190,400
State $0
Phase PE ROW CST
Fund STP STP STP
Year Underway Underway
2005
Federal
State
$693.600
$173,400
Other $0
Other $47.600
Other $0
Total $2.338.000
Total $238.000
Total $867.000
Page 289 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005
Washington
Project: 0000418 Type Work: Median Work
Descp: SR 15 FROM SR 242 TO NEWMAN ST IN
SANDERSVILLE Lanes: Exist. 2 Prop. 4
Length: 0.24
TlP#:
Project: 0002169 Type Work: Railroad Crossing
Descp: CS 704ITHOMAS ST IN DAVISBORO @ NS #
732750G
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 0005834 Type Work: Intersection Improvement Descp: SR 15AT MATTHEWS ROAD IN TENNILLE
LUMP SUM PROJECT
Length: 0.40 TIP#:
Project: 0006562 Type Work: Streetscapes
Descp: DOWNTOWN STREETSCAPE EXTENSION & KAOLIN PARK SIDEWALKS Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 222190- Type Work: Passing Lanes
Descp: SR 15 AT 3 LOC BTWN WRIGHTSVILLE &
TENNILLE/& WASHINGTON
Lanes: Exist. 2 Prop. 3
Length: 4.03
TlP#:
Project: 222280- Type Work: Widening
Descp: SR 24/SR 540 FM SOUTH OF CR 186 TO CR 10 IN
WASHINGTON CO
Lanes: Exist. 2 Prop. 4
Length: 7.80
TlP#:
Project: 222285- Type Work: Widening Descp: SR 24/SR 540 FM CR 10 TO JUST WEST OF SR 68
Lanes: Exist. 2 Prop. 4
Length: 8.00 TlP#:
Project: 231240- Type Work: Passing Lanes
Descp: SR 24 BET SANDERS'LE & DAVISBORO EB MP
14.3-13.4;WB 5.3-7.0
Lanes: Exist. 2 Prop. 3
Length: 1.60
TlP#:
Project: 245080- Type Work: New Construction
Descp: SR 15 BYP/CR 67 EXT FM SR 15 TO SR 242 WEST
OF TENNILLE
Lanes: Exist. 0 Prop. 4
Length: 3.00
TlP#:
Project: 245090. Type Work: Widening
Descp: SR 15 BYP/CR 67 FM SR 242 TO SR 15 {EXC
262480-0.6 Mil
Lanes: Exist. 2 Prop. 4
Length: 4.23
TlP#:
Project: 245140- Type Work: Replace Bridge Descp: SR 24 OVER WILLIAMSON SWAMP CREEK 1.3
MILES NW OF DAVISBORO Length: 0.25
TIP#:
Phase Fund PE STP ROW STP CST STP
Year Underway
2006 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund PE STP ROW STP CST STP
Year Underway
LUMP LUMP
Phase Fund CST STP
Year LUMP
Phase Fund PE STP ROW STP CST STP
Year Underway
2005 After 2007
Phase Fund PE HPP ROW HPP CST Bond
Year Underway
2005 2007
Phase Fund PE NHS ROW Bond CST Bond
Year Underway
2005 2006
Phase Fund PE STP ROW STP CST STP
Year Underway
2005 After 2007
Phase Fund PE STP ROW STP CST STP
Year 2005 After 2007 After 2007
Phase Fund PE STP ROW STP CST STP
Year 2005 After 2007 After 2007
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 2005
Federal $240,000
State $60,000
Federal $100,000
State $0
Federal
$100,000 $1,094,400
Federal $500,000
State
$25,000 $121,600
State $0
Federal $92,800
State $23,200
Federal
State
$2,251,200 $0
$562,800 $21,994,000
Federal
State
$0 $2,008,000 $0 $19,800,000
Federal $12,000
State $3,000
Federal $340,000
State $85,000
Federal $360,000
State $90,000
Federal
$4,000 $2,480,000
State
$1,000 $620,000
Other $0
Other $0
Other $0 $0
Other $125,000
Other $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $0
Other $0 $0
Total
$300,000 Total
$100,000
Total e $125,000
$1,216,000
Total $625,000 Total
$116,000 Total $2,814,000
$21,994,000
Total
$2,008,000
$19,800,000 Total
$15,000 Total
$425,000
Total $450,000 Total
$5.000
. $3,100,000
Page 290 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2flI2QQ5
Washington
Project: 262480- Type Work: Minor Widen & Resurf
Descp: SR 24 RELOC ALONG CR 67 FM SR 24 N TO SR
540/FALL LINE FWY Lanes: Exist. 2 Prop. 3
Length: 0.58
TIP#:
Phase PE ROW CST
Fund STP STP STP
Year Underway Underway
2005
Federal $497.600
State $124,400
Other $0
Total $622.000
Page 291 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Wayne
Project: 0006541 Type Work: Sidewalks Descp: ODUM SIDEWALKS & LIGHTING
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 0006542 Type Work: Streetscapes
Descp: SCREVEN STREETSCAPE SIDEWALK
STREETSCAPE ONLY
Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 522390- Type Work: Widening Descp: SR 38IUS 84 FM SR 203 TO CR 392 AT JESUP
Lanes: Exist. 2 Prop. 4
Length: 5.10 TlP#:
Project: 542425- Type Work: Replace Bridge Descp: SR 203@ REEDY CREEK 1.1 MI E OF APPLING CO
LINE Length: 0.54
TlP#:
Project: M002382 Type Work: Bridge Painting Descp: PROPOSED BRIDGE PAINTING @ SEVERAL
LOCATIONS IN WAYNE CO Length: 0.00
LUMP SUM PROJECT
TlP#:
Phase Fund CST STP
Year LUMP
Federal $98,400
State $0
Phase Fund CST STP
Year LUMP
Federal $300,000
State $0
Phase Fund PE State ROW RRBS CST RRBS
Year Underway
2005 2007
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway Underway
2005
Phase Fund CST STP
Year LUMP
Federal
State
$0 $6,44;,000 $0 $11,129,000
Federal
State
$1.176,000
Federal $158,400
$294,000
State $39,600
Other $24,600
Other $75,000
Other $0 $0
Other
$0 Other
$0
Total
$123,000
Total
$375,000
Total
$6,441.000
$11,129,000
Total $1,470,000
Total
$198,000
Page292of300
STATE TRANSPORTATION IMPROVEMENT PROGRAM
ZmZQQ5
Webster
Project: 333165. Type Work: Replace Bridge
Descp: SR 27IUS 280 @ LANAHASSEE CREEK 2.2 MI E OF
PRESTON
Length: 0.50
TlP#:
Project: 343360. Type Work: Replace Bridge Descp: SR 41 @ BEAR CREEK 1.8 MI N OF WESTON
Length: 0.25 TIP#:
Project: 343361- Type Work: Replace Bridge
Descp: SR 41 @ KINCHAFOONEE CREEK IN SW
PRESTON
Length: 0.41
TIP#:
Project: 343362. Type Work: Replace Bridge
Descp: SR 153@ LANAHASSEE CREEK 3.5 MI NE OF
PRESTON
Length: 0.27
TlP#:
Project: 343364. Type Work: Replace Bridge Descp: SR 45 @ KINCHAFOONEE CREEK AND
OVERFLOW W. OF SUMTER CO LINE Length: 0.85
TIP#:
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2006
Federal
$20.000 $1,078,400
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2007
Federal
$10,400 $704,800
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2007
Federal
$8.000 $1.173.600
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2007
Federal
$14,400 $793.600
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2005 2005
Federal
$24.000 $2.609,600
State $5.000
$269.600
State $2.600
$176,200
State $2.000
$293,400
State $3,600
$198,400
State $6,000
$652,400
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Total $25.000 $1.348.000
Total $13.000 $881.000
Total $10.000 $1,467.000
Total $18.000 $992.000
Total $30.000 $3.262.000
Page 293 of 300
STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005
Wheeler
Project: 0001366 Type Work: Replace Bridge Descp: SR 30/US 280 @ OCONEE RIVER AT
WHEELER/MONTGOMERY CO LINE Length: 0.65
TlP#:
Project: 561470. Type Work: New Construction
Descp: N MCRAE BYP FM US 341/S BYP TO US
441IWHEELERIINCL SIGNALS
Lanes: Exist. 0 Prop. 4
Length: 2.80
TIP#:
Project: M002428 Type Work: Bridges
Descp: SR 46 OVER THE OeONI:;!:; HIVER I::lRIDGE
ID#309-o0160
Length: 0.40
LUMP SUM PROJECT
TIP#:
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway
2006 After 2007
Phase Fund
PE
State
PE
Bond
ROW State
ROW Bond
CST Bond
Phase Fund
CST PR
Year Underway Underway Underway
2006 After 2007
Year LUMP
Federal $55,200
State $13,800
Federal
State
$0
Federal $0
$491,000
State $100,000
Other
$0
Total $69,000
Other
Total
$0 Other
$0
$491,000
Total S100,OOO
Page 294 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
White
Project: 0001935 Type Work: Welcome center facilities Descp: HARDMAN FARM VISITOR CENTER - PARKING
LOTS&PEDESTRAIN TRIAL Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006665 Type Work: Guardrail
Descp: SR 17/SR 75 FM .08 MI S OF HELEN CITY LIMITS
TO CR 110
Length: 0.65
LUMP SUM PROJECT
TIP#:
Project: 122130- Type Work: Widening
Descp: SR 75 FM SR 75 ALT/CLEVELAND NE TO
ASBESTOS RD/CR 88
Lanes: Exist. 2 Prop. 3
Length: 2.21
TlP#:
Project: 122240- Type Work: Widening
Descp: SR 11/US 129 FM SR 284/CLERMONT TO
CLEVELAND BYPIWHITE CO
Lanes: Exist. 2 Prop. 4
Length: 24.00
TIP#:
Project: 162390- Type Work: New Construction
Descp: CLEVELAND WEST BYP FM SR 11 N ON NEW
LOC/HULSEY RD TO SR 75
Lanes: Exist. 0 Prop. 4
Length: 4.60
TlP#:
Phase Fund CST STP
Year LUMP
Federal $576,800
State $0
Phase Fund PE STP CST STP
Year Underway
LUMP
Federal $81,000
State $9,000
Phase PE ROW ROW CST
Fund STP STP State STP
Phase Fund
PE
STP
ROW STP
CST STP
Year Underway Underway Underway
2007
Year Underway
2007 After 2007
Federal
$3,600,000 Federal
$2,741,600
State
$900,000 State $685,400
Phase PE ROW CST
Fund NHS NHS NHS
Year Underway
2006 After 2007
Federal $5,707,200
State $1,426,800
Other $144,200
Other $0
Other
$0 Other
$0
Other $0
Total $721,000
Total $90,000
Total
$4,500,000 Total
$3,427,000
Total $7,134,000
Page 295 of 300
STA TE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005
Whitfield
Project: 0000931 Type Work: Interchange
Descp: 1-75@ SR 3/US 41/ROCKY FACE EXIT - PHASE 2
INT RECONST Lanes: Exist, 4 Prop, 6
Length: 0,72
TlP#:
Project: 0002377 Type Work: Bicycle/Pad. Facility
Descp: THE ATLANTA CAMPAIGN & MARCH TO THE SEA
HERITAGE TRAILS
Length: 0,00
LUMP SUM PROJECT
TlP#:
Project: 0003776 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCS
ALONG SR 52 AND SR 2 Length: 0,00
LUMP SUM PROJECT
TlP#:
Project: 0004607 Type Work: Railroad Crossing Descp: CR 3/HENRY OWENS ROAD @ NS# 719723E
LUMP SUM PROJECT
Length: 0,20 TIP#:
Project: 0006081 Type Work: Water Pollution Mitig,
Descp: PARCEL 1W & 2W TO MITIGATE PI# 610890- IN
WHITFIELD COUNTY
Length: 0,00
LUMP SUM PROJECT
TlP#:
Project: 0006318 Type Work: Lighting
Descp: 1-75@ SR 52/wALNUT AVENUE INTERCHANGE LIGHTING Length: 0.40
LUMP SUM PROJECT
TIP#:
Project: 0006618 Type Work: Historic Facilities Descp: NORFOLK SOUTHERN DEPOT AREA RENOVATION
LUMP SUM PROJECT
Length: 0.00 TlP#:
Phase Fund ROW 1M CST 1M
Year 2006 After 2007
Phase Fund CST STP
Year LUMP
Phase Fund PE STP
CST STP
Year Underway
LUMP
Phase Fund CST STP
Year LUMP
Phase Fund ROW SIP
Year LUMP
Phase Fund CST NHS
Year LUMP
Phase Fund CST STP
Year LUMP
Federal $767,700
State $85,300
Federal $688,240
State $0
Federal $884,000
State $221,000
Federal $130,000
State $0
Federal $480,000
State $120,000
Federal $80,800
State $20,200
Federal $250,400
State $0
Other $0
Other $172,060
Other $0
Other $0
Other $0
Other $109,000
Other $62,600
Total
$853,000
Total
$860,300
Total $1,105,000
Total
$130,000 Total
$600,000
Total $210,000
Total
$313,000
Page 296 of 300
STATE TRANSPORTA nON IMPROVEMENT PROGRAM 2aa005
Wilcox
PrOject: 432070.
Type Work: Replace Bridge
Descp: SR 30/US 280 @ ALAPAHA RIVER TRIB. 0.8 MI E
OF SEVILLE
Length: 0.63
TlP#:
Phase PE ROW CST
Fund Bridge Bridge Bridge
Year Underway Underway
2005
Federal
State
$800,000
$200,000
Other $0
Total $1,000,000
Page 297 of 300
STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005
Wilkes
Project: 0001367 Type Work: Replace Bridge Descp: SR 47/US 378 @ REHOBOTH BRANCH 7.1 MI E OF
WASHINGTON Length: 0.22
TlP#:
Project: 0006067 Type Work: Railroad Crossing Descp: SR 44 SPUR/HARRIS ROAD @ GWCR #279757G
LUMP SUM PROJECT
Length: 0.40 TIP#:
Project: 0006088 Type Work: Railroad Crossing Desco: CR 240/HOSPITAL DRIVE @ CWCR #2797620
LUMP SUM PROJECT
Length: 0.40 TIP#:
Project: 0006608 Type Work: Streetscapes
Descp: CITY OF WASHINGTON PEDESTRIAN ENHANCEMENT PROJECT Length: 0.00
LUMP SUM PROJECT
TlP#:
Project: 221740. Type Work: Widening
Descp: SR 17 FM MP 13.0-16.9IMP 23.2-26.3 INCL 3-CLVTS
&BRDG
Lanes: Exist. 2 Prop. 4
Length: 7.00
TIP#:
Project: 222260- Type Work: Widening
Descp: SR 17 FM N WASHINGTON BYP TO PASSING LN
SO OF CR 193 (EXC)
Lanes: Exist. 2 Prop. 4
Length: 11.75
TlP#:
Project: 222460. Type Work: Passing Lanes
Descp: SR 10: OGLETHORPE MP13.7-15;15.3-16.2&
WILKES: 0-1.5;5.5-7.0
Lanes: Exist. 2 Prop. 3
Length: 5.70
TIP#:
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 2006
Phase Fund CST STP
Year LUMP
Federal
$4,000 $965,600
Federal $145,000
State
$1,000 $241,400
State $0
Phase Fund CST STP
Year LUMP
Federal $175,000
State $0
Phase Fund CST STP
Year LUMP
Federal $140,000
State $0
Phase Fund PE State PE Bond ROW Bond CST Bond
Phase Fund
PE State
PE
Bond
ROW Bond
CST Bond
Phase Fund PE STP ROW STP CST STP
Year Underway Underway
2006 2007
Year Underway Underway
2006 2007
Year Underway
2006 2007
Federal
State
$0 $0
Federal
$300,000 $16,342,000
State
$0 $0
Federal
$4,907,000 $23,110,000
State
$72,000 $4,812,800
$18,000 $1.203.200
Other $0 $0
Other $0
Other $0
Other $35,000
Other
$0 $0 Other
$0 $0 Other $0 $0
Total $5.000
$1.207.000 Total $145,000
Total $175,000
Total $175,000
Total $300,000 $16,342,000 Total $4,907.000 $23,110,000 Total $90,000 $6.016,000
Page 298 of 300
~
..,' '.
STATE TRANSPORTATION IMPROVEMENT PROGRAM 20/2005
Wilkinson
Project: 0000346 Type Work: New Construction
Descp: FALL LINE FWY ON NEW LOC FM US
4411WILKINSON CO TO SR 24
Lanes: Exist. 0 Prop. 4
Lenglh: 9.33
TIP#:
Project: 0006563 Type Work: Streetscapes
Descp: GORDON MAIN STREET STREETSCAPE IMPROVEMENT PROJECT Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 221870- Type Work: New Construction
Descp: FALL LINE FWY/NORTH GORDON BYPASS FM SR
57 TO SR 243 @ LAKE Lanes: Exist. 0 Prop. 4
Length: 7.20
TIP#:
Project: 222220- Type Work: Bridge Rehab
Descp: SR 57 OVER THE OCONEE RIVER AT
WASHINGTON COUNTY LINE
Lanes: Exist. 2 Prop. 3
Length: 0.84
TIP#:
Project: 262470- Type Work: New Construction
Descp: FALL LINE FWY ON NEW LOC FM SR 243 @
MORNINGSIDE TO US 441
Lanes: Exist. 2 Prop. 4
Length: 8.12
TIP#:
Project: M002902 Type Work: Resurface & Maintenance
Descp: SR 18 FM SR 18 SPURIWILKINSON TO RAILROAD
TRACKITWIGGS
Length: 14.38
LUMP SUM PROJECT
TlP#:
Phase Fund ROW Bond CST Bond
Year Underway
2007
Federal
State
$0 $48,487,000
Phase Fund CST STP
Year LUMP
Federal $400,000
State $0
Phase PE ROW CST
Fund HPP HPP HPP
Year Underway Underway
2005
Federal $15,425,600
State $3,856,400
Phase Fund PE Bridge ROW Bridge CST Bridge
Year Underway
2005 2005
Federal
$16,800 $6,488,800
State
$4,200 $1,622,200
Phase Fund PE State PE Bond ROW Bond CST Bond
Phase Fund CST STP
Year Underway Underway Underway
2006
Year LUMP
Federal
State
$0
Federal $1,830,400
$32,759,000
State $457,600
Other $0
Other $100,000
Other
$0 Other
$0 $0 Other
$0 Other
$0
Total $48,487,000
Total $500,000
Total
$19,282,000 Total $21,000
$8,111,000 Total
$32,759,000 Total
$2,288,000
Page 299 of 300
STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 2012005
Worth
Project: 0000522 Type Work: Intersection Improvement
Descp: SR 133 AT COUNTY LINE ROADICR 459 AT
WORTHIDOUGHERTY CO LN
Lanes: EXist. 2 Prop. 4
Length: 0.60
LUMP SUM PROJECT
TIP#: TSM-8
Project: 0005927 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VAR LOCS IN BEN HILLITURNERIWORTH Length: 0.00
LUMP SUM PROJECT
TIP#:
Project: 0006553 Type Work: Streetscapes Descp: SYLVESTER STREETSCAPE & SIDEWALK
LUMP SUM PROJECT
Length: 0.00 TlP#:
Project: 432092- Type Work: Replace Bridge Descp: SR 32@ FLINT RIVER AND OVERFLOW AT THE
LEEIWORTH COUNTY LN. Length: 1.17
TIP#: OR-)
Phase Fund ROW STP CST STP
Year LUMP LUMP
Phase Fund CST STP
Year LUMP
Phase Fund CST STP
Year LUMP
Phase Fund
PE
Bridge
ROW Bridge
CST Bridge
Year Underway
2005 2005
Federal $90,000
$810,000
State $10,000 $90,000
Federal $1,040,000
State $260,000
Federat $500,000
State $0
Federal
$45,600 $4,904,000
State
$11,400 $1,226,000
Other $0 $0
Other $0
Other $125,000
Other $0 $0
Total $100,000 $900,000 Total $1,300,000 Total $625,000 Total $57,000 $6,130,000
Page 300 of 300
e
..'
APPENDIX A
Glossary
.' 1
..'
GLOSSARY OF TERMS
ATMS Advanced Transportation Management System; a computerized system that integrates video, voice, and data management functions to collect information about the transportation infrastructure and performance analysis as well as support traffic management decisions based on real-time information.
CMAQ Congestion Mitigation and Air Quality Improvement Program; directs funds primarily to areas that have failed to reach certain air quality standards. Projects allowed under this program include mass transit improvements and high-occupancy vehicle facilities.
CST Construction; phase of a project that includes the actual construction of the project.
.,'
DONOR STATE BONUS Donor states are states that contribute more to the Highway Trust Fund than they receive back in federalaid highway programs. These states receive a predetermined amount based on a comparison of a projection of all payments into the Highway Trust Fund and the amount received in federal-aid apportionments. Starting with the state with the lowest return, states are brought up to the level of return for states with the next higher level of return until available funds are depleted.
FED Share
'.
Federal Share; portion of funding to be paid for with federal money.
GARVEE Grant Anticipation Revenue Vehicle; bonds against anticipated federal funds for the purpose of accelerating the construction of the "Governor's Road Improvement Program".
GAShare Georgia Share; portion of funding to be paid for with state money.
GRVA GARVEE Advance; advance funding to pay for "Governor's Road Improvement Program" projects with GARVEE bond before converting to regular federal aid funding.
GRVC GARVEE Converted; funding to pay back the GARVEE bond.
HPP High Priority Project; list of 1,850 high priority projects specified by Congress in TEA-21. Funding for these projects totals $9.4 billion over the six years ofTEA-21. Georgia will receive $283.87 million for 40 projects.
HIGHWAY TRUST FUND Federal account established by law to hold receipts collected by the government, earmarked for highway programs and a portion of the mass transit program; supported by the federal gasoline tax and other user taxes.
INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT of 1991 (lSTEA) Transportation bill approved by Congress in 1991.
METROPOLITAN PLANNING ORGANIZATION (MPO) Required by federal regulations in urbanized areas to develop transportation plans and programs; responsible for developing the Transportation Improvement Program (TIP).
NEPA National Environmental Policy Act of 1969; requires federal government to use all practical means and measures to protect environmental values; makes environmental protection a part of the mandate of every federal agency and department.
NHS National Highway System; consists primarily of the Interstates and other major routes. Includes a large percentage of urban and rural principal arterials.
NON-ATTAINMENT The 13 county area around Atlanta that fails to meet federal air-quality standards. Projects in the nonattainment area are not allowed to proceed ifthere is an increase in capacity of a roadway unless they were identified in the 1995 TIP for Atlanta.
OBLIGATION CEILING The maximum amount that a state is expected to receive from the Highway Trust Fund.
OTHShare Other Share; portion of funding to be paid for with money other than federal or state funds; generally provided by local governments.
PE Preliminary Engineering; phase of a project that includes the development ofthe concept, survey, environmental documentation and design plans.
ROW Right of Way; phase of a project that includes the acquisition of any necessary property for the construction of the project.
STATE AID LET Projects that are funded with state money.
STATE HIGHWAY SYSTEM Network of roads maintained by the state including road and bridge construction, maintenance, rehabilitation and restoration. There are approximately 17,947 miles of state highways in Georgia which make up 16% of the total public road system in the state.
e
..' .'.'
STP Surface Transportation Program; federal funding category that provides funding for projects on any federal-aid highway, including the NHS, bridge projects on any public road, transit capital projects, and public bus terminals and facilities.
TRANSPORTATION EQUITY ACT FOR THE 21ST CENTURY (TEA-21) Six year transportation bill approved by Congress in 1998.
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) In metropolitan areas over 50,000 in population, a program of federally funded transportation projects proposed to be carried out in the first three years of adoption by the MPO. There are 11 urbanized areas in Georgia - Chattanooga, Rome, Athens, Augusta, Savannah, Brunswick, Macon, Columbus, Albany, Atlanta, and Warner Robins. The TIPS's are incorporated into the STIP as adopted by the respective governments and approved by the Governor, with no changes.
TYPE WORK - category of project and source of funding ATMIITS - Advanced Transportation Management/Intelligent Transportation System; work relating to computerized transportation system that supports traffic management decisions; commonly known as the NAVIGATOR System. Bicycle/Ped. Facility - generally bike/pedestrian path/lane funded through a Transportation Enhancement Activity (TEA) project. Bridges -lump sum funding identified for bridge maintenance or bridge painting. Bridge Painting - lump sum for bridge painting. Bridge Rehab - bridge rehabilitation - work that will improve and/or widen an existing bridge. Capital - funding identified for the purchase of transit related items. Historic Preservation - restoration or rehabilitation of historic structures that have a direct linkage to the transportation system; funded as part of a Transportation Enhancement Activities (TEA) project. Interchange - work at an interchange. Intersection Improvement - work that will improve an existing intersection. Landscaping - purchase/installation of shrubbery, plants, trees, etc. Lighting - lump sum funding for purchase/installation of lighting along a National Highway System road. Miscellaneous Improvements - identified for various projects that are not necessarily covered by a standard category. New Construction - new roadway construction on new location. Operating: funding identified for the operation of transit systems. Passing Lanes -- passing lanes added along an existing roadway. Preliminary Engineering - the design phase of a project. Ramp - construction work on a ramp at an interchange. Realignment - improvements to the geometry of a roadway. Replace Bridge - construction of a new bridge to replace an existing bridge. Rest Area -construction of rest areas along state routes (Interstates). Resurface and Maintenance - re-paving of a roadway and minor improvements. RR Xing - improvements to a road/rail crossing, such as the installation of gates, bells, lights, or improvements to the crossing itself. Safety - work that is designed to reduce accidents.
'
Shoulder Work - improving and/or widening shoulders on a roadway.
Sidewalks - installation of sidewalk. Signals - installation and/or improvement of signals. Signing - fabrication/installation of roadway signs. Special Studies - lump sum funding for planning and management studies. Turn Lanes - addition of turn lanes at intersections. Water Pollution Mitig. -lump sum funding for wetland mitigation site that were taken by roadway construction. Weigh Station - construction and/or rehabilitation of truck weigh stations. Widening - adding additional travel lanes to a roadway.
e
APPENDIXB
Transit tables
:
T~SIT
.'
Table of Contents:
Urban Transit Programs
Albany ------:----------------------------------------------- 1
Athens ---------------------------------------------------- 7
' Atlanta (Including Metro Counties)---------------------13
Augusta --------------------------------------------------- 23
Brunswick ------------------------------------------------ 30
Columbus ------------------------------------------------- 33
Gainesville------------------------------~------------------ 36
Macon ----------------------------------------------------- 41
Rome ------------------------------------------------------' 48
Savannah--------------------------------------------------- 52
.'
Warner Robins ------------------------------------------- 57 Rural Transit Programs---------------------------------------~- 60
ALBANY
CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5307
Transit Coach/Lease Capital Maintenance Items Maintenance Tools and Equipment Bus Stop Amenities Office & Facility Automation Security/Surveillance Equipment/Upgrade Fareboxes & Related Equipment Office Equipment/Furniture Facility Modifications Multi-Modal Facility Lease
FEDERAL COST STATE COST LOCAL COST
:,::::,::,:::'::,F~::i:i:::::::
:':.:.;::ltQPQ.~Qgi:.:ili:,:::
$120,138 I
$120,138 I
$120,138 I
$360,414
$160,000 I
$160,000 I
$160,000 I
$480,000
$10,000 I $25,000 I $15,000 I
$5,500 I $25,000 I $5,000 I
$5,500 I
$25,000 ,
$5,000 I
$21,000 $75,000 $25,000
$20,000 I
I
I
$20,000
$20,000 I
$0 I
$0 I
$20,000
$30,000 I .
$5,000 I
$5,000 I
$40,000
$50,749 I
$12,500 I
$12,500 I
$75,749
$170,000 I
$170,000 I
$170,000 I
$510,000
i::::;:;:;:; },}{{:~:?}?}:::::::::::::::::::.::;:: .:;:;:::::::::::;::::
:.:.: ; :.:.:.:.:.: ';':':':':':':':':':':':::::::::::::::':::":':';:::::::::::::::::::::::::. ::::::::::::::::::::::~::.: ::;::: ..::::::':':":::':::':':':':',',
itV miti~g9.~~~f'j ttttt::~g;m!~t::v::v:::::::::::::~~q~~1:~~::: :','vvrrM;~g7M~:~t
I
$496,710
$402,510
$402,510
$1,301,730
$62,089 I
$50,314 I
$50,314 I
$162,716
$62,089 I
$50,314 I
$50,314 I
$162,716
DOT DISTRICT # 4
CONG. DIST.
21RDC
SWG
......
OPERATING ASSISTANCE SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5307
::::::::;:;':&9:gQ~I~:i::::ilitl;": ::*gQ9~~1:;'::::::;;:;;;I;lJ1'mlgg,1:;:::';;::;;;;;:; ::)(\::f::;;;:;;;;:;::iii::::m::::r:r::::::?::::::ffllt;9g;;;;;::;;,;,,;:r:::FYJPp;::::::;:::::::::::;;:;";;;:::;:;;::;:::::F!:;:P!i::::::::::::;:;:;:;::::;;I::::::::::::::':::::mgm~I@::::::;;;':::;
07/01/04- 06/30/05
$1,960,138
$1,960,138
07/01/05 - 06/30/06
$2,009,141
$2,009,141
07/01/06 - 06/30/07
$2,154,466
$2,154,466
N;::B:g~;:M!g9;;J*(q~n:::: ::::::::??t::::::::::::;::::::.::::::.,{:):,:::,:?:::.:.. . .. . ;: :;:: : :~1:~~9Qm:R!:: ': :::::m::':::::~~~QQ~~~!!':;: :;::: :::::::;:;~g;:1;~I~!ip:::::::':':::::::':::'::~B~!:g~~fA~::::
FEDERAL COST
$763,785
$795,339
$795,339
$2,354,463
LOCAL COST
$1,196,353
$1,213,802
$1,359,127
$3,769,282
DOT DISTRICT # 4
CONG.OIST.
21 ROC
SWG
N
CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM
::~~~:.:.:i:!:::::=~~:=:i::::ii!:I:
I
$500,000
Purchase New Vehicles (2 Trolley)
I
I
$500,000 I
I
PRQ4.$:Tp$1!: :::::::::::::::::::::::Imn;Tn~~Q,o;p.Qq:H:~1I.qP.;9QQI:::::::::\$.~Q(j,fM~T:
FEDERAL COST
I
$400,000 I
$400,000 I
$400,000 I
LOCAL COST
1
$50,000 I
$50,000 I
$50,000 I
STATE COST
I
$50,000 I
$50,000 I
$50,000 I
FY2005 Vehicles-(2) 12year buses for Fixed Route FY2006
Vehicles-(2) 12year buses for Downtown Shuttle FY2007
Vehicles-(2) 12year buses for Fixed Route
$500,000 :::$1;~Q;Q(j,Q:
$1,200,000
$150,000 $150,000
DOT DISTRICT # 4
CONGo DIST. # 2
21 RDC
SWG
CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5309
!Q!J.t~$..t}( \\F.!"\P'~::}
Albany Multi-Modal Facility
I
$1,250,000 I $1,250,000 I
$0 I $2,500,000
RRQ4$:Tp$[((::\::)\\\::():::::::\\::l:\ )::::::U;~~q;QQMt((J1;?~~;QQql:::ttt:::\\ :\~~q ::\\$?;?~MQ~:
FEDERAL COST
I
$1,000,000 I $1,000,000 I
$0 I $2,000,000
LOCAL COST
I
$250,000 I
$250,000 I
$0 I
$50,000
STATE COST
I
$0 I
$0 I
$0 I
$0
DOT DISTRICT # 4
CONGo DIST. # 2
21 RDC
SWG
CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5309
:effl?4.~r$t}r:
FEDERAL COST
LOCAL COST
w
STATE COST
DOT DISTRICT # 4
CONGo DIST. # 2
$368,347
)))):($~;~4t:: $294,678 $73,669 $0
SWG
CAPITAL SCHEDULE IN ALBANY FOR ELDERLY AND DISABLED Section 5310
::,:[f9QQPP4 i'i!! '!::::'::::!:!:!::lliqQQ~~4.i::::i:!! i /!!ii!wQ(!1iggl:::!:::!:::::!::
Purchase of Service
Purchase of Service
Purchase of Service
jt;,!iQ4PRll1Eyg:!:' :::::::::: : ...;.;.;.;.;.;.;.;.;.;.:.:.-.:.:.- :.: :.:::::::::::::::::::::::::::::::::::::::
FEDERAL COST STATE COST
DOT DISTRICT # 4
$37,181
I
$29,745 I
I
$7,436 I
CONG.DIST.
$39,040
$40,992
$37,181.00 $39,040.00 $40,992.00
$31,232 I $7,808 I
$32,794 I $8,198 I
21 ROC
$93,770 $23,443
SWG
~
TRANSPORTATION IMPROVEMENT PROGRAM
Operating Assistance for Non-Urbanized Area Transit - Dougherty County Section 5311
Operating Period
1/1/05 - 12/31/05 1/1/06 - 12/341/06 1/1/07 - 12/31/07
,ft:Qject.QJ)t Federal Cost (50%) Local Cost (50%)
DOT District # 4
TOOO706 FY05 68,140
TOOO968 FY~06
75,548
TO()120~
FyT07
86,748
T()tal
68,140 75,548 86,748
$~i8, 140 $34,070 $34,070
$I~,,i48,
$37,774 $37,774
$~,71' $43,374 $43,374
$2~Q&~6, $115,218
$115,218
CONG.DIST
2
RDC
SWG
Capital Assistance for Non-Urbanized Are Transit - Dougherty County
-
Section 5311
QR~till!!9g~j~io~
Description Shuttle Van (2) Shuttle Van/Lift (3) Shuttle Bus (2)
rI9()()l()2
FY05
$0 $0 $0
tJ::()Q()~'~ FYO~
$0 $0 $0
tr!l()i!~P! fXj9~1J
$ 95,000 $154,500 $105,000
TotaJ~
~WN.-w.w
$ 95,000 $154,500 $105,000
~.t9j~~tQ~~!
~~Q
Federal Cost
$0
~.~Q
/j;31,5I;;Pl.500
~;".'. -""-"~
~gf~J;~
$0
$283,600
$283,600
VI
State Cost
$0
$0
$ 35,450
$ 35,450
Local Cost
$0
$0
$ 35,450
$ 35,450
DOT District # 4
CONG.DIST
2
RDC
SWG
TRANSPORTATION IMPROVEMENT PROGRAM
Operating Assistance for Non-Urbanized Area Transit - Lee County Section 5311
pperatil!g {'ep!od
1/1/05 - 12/31/05 1/1/06 - 12/31/06 1/1/07 - 12/31/07
Project Cost Federal Cost (50%) Local Cost (50%)
~OO0706
'FY05 $ 53,068
$53,06~
$ 26,534 $ 26,534
1ll9009~
FY06'
$ 63,998
$3,~9.~
$ 31,999 $ 31,999
mpOl2()1i
~XW~
$ 68,145
$ 6?,145..
$ 34,073 $ 34,073
[\Qtats
$ 53,068 $ 63,998 $ 68,145
~1?5,2J!
$ 92,606 $ 92,606
DOT District # 4
CONG.DIST
2
RDC
SWG
Capital Assistance for Non-Urbanized Area Transit - Lee County Section 5311
Ppe.r~til!g~]>e.l'i()d [Q~~qiptio!!!
TOOO705 FY05
[.QQ(}2~J; t!tXO~
[QQ170Q
(JJ .Oh
tt:9i a ls,
Shuttle Van (1)
$0
Shuttle Van/Lift (1)
$0
$ 46,500
$0
$ 50,500
$0
$ 46,500 $ 50,500
~.foje~iCost
$~
Federal Cost
$0
State Cost
$0
Local Cost
$0
~'i~7.,OOQ
~g
$ 77,600
$0
$ 9,700
$0
$ 9,700
$0
$'9700d ,. ~,._.. ,.. ,..,J $ 77,600 $ 9,700 $ 9,700
DOT District # 4
CONG.DIST
2
RDC
SWG
0'\
ATHENS
OPERATING ASSISTANCE SCHEDULE FOR PUBLIC TRANSIT
Athens Transit System
FY 20052007 Transportation Improvement Program
SECTION 5307
.
I
I I I I I FY05*
FY06*
FY 07*
Total Cost
PI#
TOO0664
TOO0905
T001225
TOTAL PROJECT COST $ 3,511,101 $:;::$;$1$;~~Q $ 3,619,039 $ 10,643,770
TOTAL FEDERAL COST $ 477,000 }$:i!!i:$!14iPQQii $ 517,061 $ 1,496,061
LOCAL COST
$ 3,034,101 :$H::H$~QtMp.~Qii $ 3,101,978 $ 9,147,709
- NOTE: The funding source for each fiscal year is Title 49 USC 5307.
* Federal Operating Assistance Shortfall Supplemental Funds (federal funds not utilized by other transit systems in Georgia). These funds will be requested by The Unified Government of Athens-Clarke County. Supplemental funding is not guaranteed and should it not be available service cuts or local funding would be needed.
-....)
CAPITAL SCHEDULE FOR PUBLIC TRANSIT Title 49 U.S.C. Section 5307
AT AN 80% FEDERAL, 10% STATE, 10% LOCAL SPLIT Athens Transit System and Other Mass Transit
FY 2005-2007 Transportation Improvement Program
FY II 2005
2006**
2007**
PI#
FUNDING 49 USC 5307 49 USC 5307 49 USC 5307 49 USC 5307 49 USC 5307
PROJ. # I I I I I
CAPITAL ITEM / DESCRIPTION 30 ft. Transit Bus Vehicles 35 ft. Transit Bus Vehicles 40 ft. Transit Bus Vehicles Rubber Tired Trolleys
Demand Response Vehicle-Van
UNIT COST
TOTAL
*varies *varies "varies 275,000
$
s $ 520,000
1,040,000 $ 1,120,000 $
$ -s
-$
-$
$ 825,000 $
-$
-$
-
2,680,000
-
825,000
$ 75,000 $ 75,000 $ 150,000 $ 225,000' $
450,000
49 USC 5307
II
Capital Maintenance
n/a
$ 113,411 $ 136,063 $ 120,000 $ 369,474
49 USC 5307 49 USC 5307 49 USC 5307 49 USC 5307 49 USC 5307 49 USC 5307
*49 USC 5307
II
Replace Maintenance Equipment
II
Office Equipment
n/a
$ 25,000 $ 40,000 $ 40,000 $
105,000
n/a
$
- $ 10,000 $
-$
10,000
III
Supervisor Vehicle
IV
Upgrade Fareboxes
IV
Bus Washer
V
Contingency Funds - Section "9" Grant
n/a
$ 30,000 $ 60,000 $ 30,000 $
120,000
n/a
$
- $ 200,000 $
-$
200,000
n/a
$
-$
- $ 150,145 $
150,145
n/a
$
-$
-$
-$
-
TOmAWPP$l1JP.F:PRPJ.S.!$.) :::::/\"i }}}
)$::n$.~$AWt) )$':::)hP.4Q;Q9.${ )$))1~p.~QM4~J: )$': :::)4;~P~UM~::
(formerly Section 9)
FEDERAL COST
1,270,729
1,308,850
1,348,116
3,927,695
STATE COST
158,841
163,606
168,515
490,962
LOCAL COST
158,841
163,606
168,515
490,962
** Based on projected capital needs
00
CAPITAL SCHEDULE FOR PUBLIC TRANSIT Title 49 U.S.C. Section 5309
AT AN 80% FEDERAL, 10% STATE, 10% LOCAL SPLIT Athens Transit System and Other Mass Transit
FY 20052007 Transportation Improvement Program
FUNDING 49 USC 5309 49 USC 5309 49 USC 5309 49 USC 5309
PROJ. # I I I II
49 USC 5309
III
49 USC 5309
IV
*49 USC 5309/formerly Sec. 3
FY
2005
2006
2007
PI#
CAPITAL ITEM / DESCRIPTION
UNIT COST
TOTAL
*30-40 ft.Transit Bus Vehicles* - Section "5309" Grant *varies $ 500,000 $
-$
- $ 500,000
*30-40 ft.Transit Bus Vehicles* - Section "5309" Grant *varies $
- $ 500,000 $
- $ 500,000
*30-40 ft.Transit Bus Vehicles* - Section "5309" Grant Demonstration Project - Athens Multimodal Trans. Ctr.
*varies n/a
$
-$
$ 1,964,520 $
-$ -$
500,000 $ 500,000
- $ 1,964,520
w/connection to Rail to Trail oroiect ** PI# T001279
Demonstration Project - Park-N-Ride Lots PI# T00128 Contingency Funds - Section "5309" Grant
n/a
$ 3,376,518 $
n/a
$
-$
-$ -$
- $ 3,376,518
-$
-
:$::'::("$o:crOo.o : )()::::):::::::(mQT.At:c.p$inOF:BRQJ~C.t$::::,,:::,:,\:::{::,:(,::::::?: ($::5a41:0~e.
;:$(( :::\50.0.000. :($ (::::Q.:;$4XQ$.S:
FEDERAL COST
$ 4,672,830 $ 400,000 $ 400,000 $ 5,472,830
STATE COST
$ 50,000 $ 50,000 $
50,000 $ 150,000
LOCAL COST
$ 1,118,208 $ 50,000 $
50,000 $ 1,218,208
** See Section V-A 11 in 2nd Tier for project description of Rail to Trail Project.
\0
CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80/20 SPLIT ELDERLY AND DISABLED:
Title 49 USC 5310 (formerly 16 B . 2) FY 20052007 Transportation Improvement Program
I
I . I FY05
I I I FY06
FY 07 Total Cost
PI#
TOO0647 TOO0908 T001228
: :81K~g@.w.@g*~ :~::~:::i:g~;:9@j :.:.~::::::g@Qgj. ~~::~:~::::gj::;99@,:: ~:~~~:~Q@:99::::
FEDERAL COST $ 22,881 $ 24,025 $ 25,226 $ 72,132
STATE COST $ 5,720 $ 6,006 $ 6,307 $ 18,033
LOCAL COST $
-$
-$ -$
-
....
o
CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80/20 SPLIT
GENERAL PUBLIC DEMAND RESPONSE:
Title 49 USC 5311
FY 20052007 Transportation Improvement Program
CLARKE CO.
I
I I I I I FY05
FY06
FY07 Total Cost
PI#
TOO0701 TOO0961 TOO1194
: !1J%.~Q:e.~lli~~$i :::$:::""$!i;:~P~ $':;4p;~~~::: :~:;4R;~P~:::: :::~:::::::m~f;:m~p::
FEDERAL COST
77,600 $ 36,000 $ 36,000 $ 149,600
STATE COST $ 9,700 $ 4,500 $ 4,500 $ 18,700
LOCAL COST $ 9,700 $ 4,500 $ 4,500 $ 18,700
............
OPERATING SCHEDULE FOR PUBLIC TRANSIT AT SO/50 SPLIT
GENERAL PUBLIC DEMAND RESPONSE:
Title 49 USC 5311
FY 20052007 Transportation Improvement Program
CLARKE CO.
I
I I I I I FY05
FY06
FY07 Total Cost
FI#
TOOOO702 TOOO962 TOO1195
:e!Kmijia~i:~rQ~x :$lPffi;fl4p .::$:i=::tffi;PA4:::: :i::~:=:i::::~~M:P.4:::: ::~:::::~~P~;:$.Zp.:::
FEDERAL COST $ 53,723 $ 38,886 $ 41,576 $ ':34,185
STATE COST $
-$
-$ -$
-
LOCAL COST $ 53,723 $ 38,886 $ 41,576 $ 134,185
-IV
.'
ATLANTA
CAPITAL and PLANNING SCHEDULE FOR METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY Section 5307
" " " . ' . , . , . ~~,~~g$, ~~~::::~:~J::~:~:~:::::::::~:::::~Bt1])pf:::::::::::::~:::::~::~::~}\ FY07 .....'. . .
Tools and Equipment
:~::!:!n~g99$,~g:::~':~::::::::::::::::;r9pp~~$:::::::::~::::d:::::::::::::::m991:~~9:f@::}::
:"l;\)RHVH~grl:::l~B.tMt~!9f!8::~~:::~~~RBMi!~Ql.PP}
$873,000
$874,000
$874,000
$2,621,000
Security Equipment
$850,000
$850,000
$850,000
$2,550,000
Line Structure Rehabilitation/Renovation
$450,000
$500,000
$500,000
$1,450,000
Facilities Rehabilitation/Renovation
$475,000
$525,000
$525,000
$1,525,000
Environmental Rehabilitation/Renovation
$375,000
$375,000
$375,000
$1,125,000
Training
$75,000
$75,000
$75,000
$225,000
Preventive Maintenance
$33,325,405 $33,144,619 $31,866,660 $98,336,684
Bus Replacement Program
$950,000
$950,000
$950,000
$2,850,000
Transit Enhancements
$500,000
$500,000
$500,000
$1,500,000
ADA Paratransit Service
$4,608,000
$4,604,000
$4,463,000 $13,675,000
Q~p!:Mfe.tgJ~F~trnf?t:::~'::~::: :} '\:!::::::!:,,:::::::::,? r( /\::}$I:~;$$1;49?}~:::f::::~4~~~~fJpl~~~}:::$.4P.;~~~;pp9\ $125,857,684
TRANSIT PLANNING PROGRAM
$0
Regional Transit Planning
$800,000
$800,000
$800,000
$2,400,000
Short Range Transit Planning
$950,000
$950,000
$950,000
$2,850,000
Special Projects Planning
$950,000
$950,000
$950,000
$2,850,000
Long Range Transportation Planning
$900,000
$950,000
$950,000
. ::::: :i:t~ti~if:l1t~tiniftg;:e.tqgt~m@Eqt~r:~::'::::::::::::::L::/: : : :~::::i?:;~pp;999::~::~::~~~~?mppp:::: @:~:::~:':~:::~:~;~p;;pp:~:::
$2,800,000 $10,900,000
$0
EROJec.;r\c.O$m:~,:))f~:{{~)f:?:???/ {:: rru::~~I:~:::~:$.49;9~1,;4P.$.ul~::::~::::::$~9mI:7~91:~:::~I:::::::::::::f~;pg$:;P:p9:~J $136,757,684
FEDERAL COST
I $36,865,124 I $36,838,095 I $35,702,928 I $109,406,147
STATE COST
I
I
I
I
$0
I $9,216,281
$9,209,524
$8,925,732
DOT DISTRICT # 7
4,5,6, 131RDC
ARC
......
V-J
CAPITAL SCHEDULE FOR METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY Section 5309
';;;;;;=:.1r=tlll,:IJl:=::J;;~::~:::;~re:::o:
Station Rehabilitation/Renovation/Fare Collection M-AR-202
T001131
$5,250,000
$0
$0
$5,250,000
Preventive Maintenance
MtAR@9~:::i//tt:: XgP1:t~gi i:i:t?k
$500,000
$0
$0
$500,000
Rail Car Rehab/Retrofit Propulsion System
M-AR-211
T001133
$18,000,000
$0
$0 $18,000,000
Rail Car Procurement
MtARf4.9Q::::t::::t: XgP11~//::/:: $2,000,000
$0
$0
$2,000,000
Total
$28,250,000
$0
$0 $28,250,000
i.?!4~a$.ij9J;J.q~::f!~91mmK::::::::::::i::t:::':::::):':L::p:m!e!::,::ttf::::::::::::Xgp~~~~"::::':::'::::::::::i::::mg~@'9.~K::::m::,:::::t:'?mpp.J~~J:::::fti
Procurement of Clean Fuel Buses
MiARB:14.i i/::/::} XgQ?~~/://::'::}
$3,000,000
$0
$0
Totall
1
1 $3,000,0001
$01
$01
$3,000,000
R#.H::tM~h$.~i,V't~H~M::glq~!#H9'6.~:))):$:J:!p#::f::::)mt:):
North Line Extension/Railcars
INOT IN ARC TIP
::t)r.qQ.9?~Z)mttlt:))::]gOO~@'1r::::::):Ft:):::mQ.Q4~?gmf::::: $331,763
$331,763
~gA~i.;'TI~}}t::::::::\:::::t:::: :::::::::::,,:it::::)'}fffW\,::t:)::::::::;:
FEDERAL COST STATE COST LOCAL COST
DOT DISTRICT # 7
:?')$9.)t;p~
$24,865,410
$2,100,000
$4,116,353
$01
4,5,6, 131RDC
r:mf:$.~1W~~t;:t~
$0 $24,865,410 $2,100,000
$01 $4,116,353
ARC
....
~
OPERATING ASSISTANCE SCHEDULE FOR NONURBANIZED AREA TRANSIT (Atlanta Area) Section 5311
qQqNmx:\I$.m!ed~..:':::::::::::)))UIA.RQimI.P#} \UI\FYfQ$ ii:iii:U::li:::iii::::::iffiMiP~i::\\\I\ '::i::::i::::ffiMi:P7iUi::::::::::::::I:::::::U: TOTAL.:ii::::
Cherokee 1T000710
AR-CH-5311A
T000972
T001205
Canton 1T000710
AR-CH-5311 B
T000972
T001205
Henry
1T000704
AR-HE-5311B
T000966
T001199
i9rrAl#:g$.1[$i(ii)):'( ::::\..:::://\::<:.
FEDERAL COST (50%)
LOCAL FUNDS (50%)
$344,195
$344,195
$385,126
$385,126
$405,470
$405,470
$134,052
$134,052
$159,501
$159,501
$166,050
$166,050
$405,064
$405,064
$425,236
$425,236
$445,928 I
$445,928
. . . . . .; )$:f4~~~$~]:( }::::{\$Mq~~~gi]}U:m:::::::ii}$~$1j~~~::::I:::::::}:::::::$4;7q~~fg:::
$374,6301
$405,181 1 $425,6991 $1,435,311
$374,6301
$405,181 1 $425,6991 $1,435,311
CAPITAL SCHEDULE FOR NONURBANIZED AREA TRANSIT (Atlanta Area) Section 5311
QQQNJ?fht:4PJ;$PR1RJ.1QN :)t i: ::ttIARQiTIBU(i:iiii/' ::i:ii((F)Q~(:(ii:::lt::t::F]).:t:)::i::::::I::::::::::::t:::F~rV::)::::::::::l::::))i,(mOmAt/\i\\
STIP #
IAR-CH-5311 C
Cherokee IShuttle Buses with lift
T000709 I T000971 I T001204
$111,ooo-T-$O- 1$57,500
$168,500
Shuttle Buses Two-way Radio
$50,500 1 $103,000 1
$0
$500 I
$0
I
$0
$153,500 $500
Canton ISTIP #
IAR-CH-5311D
T000709 I T000971 I T001204
Shuttle Buses with lifts
$0
1 $56,500 1 $57,500
$114,000
Shuttle Buses
$0
1 $51,500 1
$0
$51,500
Two-way Radio
$0
1 $100 1
$0
$100
STIP #
IAR-HE-5311A
T000703 I T000965 I T001198
Henry
IShuttle Buses with lift
$204,000 1 $52,000 1 $106,000 1 $362,000
Wptr*.PXJQiW@""':::t::::::,/')":tr:':r'tif:', "'3;::::;::::::::::
":::f::~$~~HqQP:::::t::::I::::::::::::::~g~;,:qQf'::f:I::::tf~g~:tmqQ\:t:'::I':::\:'::'~~$P;:tP:QJt:'t::
.....
FEDERAL COST (80%)
VI
STATE FUNDS (10%)
LOCAL FUNDS (10%)
$292,800 1
$36,600 1
$36,600 -I
$210,480) $26,310 1 $26,310 1
$1'16,8-00- 1 $680,080
r-- $22,100 I $85,010
$22~nfd--
-$85,010
CAPITAL SCHEDULE FOR ELDERLY AND PERSONS WITH DISABILlTI'ES ATLANTA AREA Section 5310
:P.PQNmv'/j) ST:IPW#) ( ::,:::: i ARCnp#/// ( ::EYj~PQ$/) :':FY:~QQ~) :":j')PY/,2QQ:V/ :'/: )j:j'))SfP:1Att :,:,:"
Cherokee
T000591
AR-CH-5310
$28,601
T000988
$30,031
T001271
$2,1,533
$90,165
Clayton
T000592
AR-CL-5310
$45,762
T000989
$48,050
T001272
$E;0,452
$144,264
Cobb
T000593
AR-CO-5310
$120,124
T000990
$126,130
T001270
$132,437
$378,691
Dekalb
T000594
AR-DK-5310
$183,046
T000991
$192,199
T001268
$201,809
$577,054
Douqlas
T000595
AR-DO-5310
$20,021
T000992
$21,022
T001273
$22,073
$63,116
Fayette
T000596
AR-FA-5310
$20,021
T000993
$21,022
T001274
$22,073
$63,116
Fulton
T000597
AR-FN-5310
$248,829
T000994
$261,270
T001269
$274,334
$784,433
Gwinnett
T000598
AR-GW-5310
$80,083
T000995
$84,087
T001275
$88,291
$252,461
Henry
T000599
AR-HE-5310
$22,881
T000996
$24,025
T001276
$25,226
$72,132
Rockdale
T000600
AR-RO-5310
$14,300
T000997
$15,016
T001277
$1(;,766
$45,082
b:m=P=:r.A=;.:ti=)P=:W=.$=;n=m:_'j:j::/'m:$.Z$$."l:igja :;:::j:::::::;:;::::':':;:$.$.2g;a$.2)m:;//:;:;/I$el:i~Hm.>';:;'m:;:;';:;:$.Z4.1o.~$.t4:
FEDERAL COS~
$626,934
$658,282
$691,195
$1,976,411
-0"1
STATE FUNDS (20%)
$156,734
$164,570.
$112,799
$494,103
::::;:::;::~:~:~:~:~:~;~:~:~:~:~:~:~:::::::::.: .........:...::;:::::::::::;:;:::::.:.....
BARROW
BARTOW PJ1F't~rHf\NmQN(( CHEROKEE CLIFTON CORRIDOR TMA
- l,;UWETA
I-AYETTE
-FORSYTH
\,jRTA
-HALL
Ht:NRY
- NEWTON
t""AULDING
- ROCKDALE
~)t""ALDING
T001410 T001400 T001401 T001402 T001403 T001404 T001405 T001406 T001407 T001408 T001409
.1:;tt~Q~WE~1!m~:I:~~g:;~411}~~~;~g$:
Transit Facilities I $34,773 I $34,824 Transit Facilities I $30,641 I $30,686
Tt?h$.Jtlt@nlt@$::I:~g91@~li(i~gB?i1@~:
Transit Facilities I $234,800 I $235,139
Transit Facilities $1,157,534 $1,149,624
Transit Facilities $101,071 $101,219
Transit Facilities $312,271 $312,729
Transit Facilities $255,825 $256,200
Transit Facilities $2,303,561 $2,288,356
Transit Facilities
$20,145
$20,174
Transit Facilities
$349,131
$349,643
Transit Facilities
$149,991
$150,211
Transit Facilities $210,700 $211,009
Transit Facilities
$260,071
$260,451
Transit Facilities $170,880 $171,130
:eBigg;Hm::RQ$:1:::::::~~;1$7;9g?1~~n~~t~~$~:::
FEDERAL COSl $4,925,620 I $4,910,286
STATE COST I
$0 I
$0
LOCAL COST I $1,231 ,405 I $1,227,572
--...J
$3,566,164 $304,851 $941,874 $771,620
$9,406,306 $60,760
$1,053,051 $452,405
. $635,514 $784,426 $515,409 1::::::~gQ;:9:~g;:QYW::l $16,881,553 .
$0 $3,513,518
CAPITAL SCHEDULE FOR CLAYTON COUNTY Section 5307
]:'::::'::::::Blt:P::jj:j:::"j::::,::j':ffiKOS:)'::" '(::/::://FY1Q1i:::::::::jjj::j':jjl'
!!!!!~lli~~~~ii:!:!;;:~ilil~i::~~!.i:i=il~~=:iil!!!!1
Transit Facilities
I $1,632,711
$1,632,700
$1,678,940
:::RRQ,~B*:::Hgm:::::jj::::jjj:::fj:j:::~m::mm:j:;:;1':::::]:::):I::I::::::~n:::::mj::::j:j::j:j:jjjjj:j::::j:j:j:::]::::j::j::j:j::jj::~W;9~:~;i11:jljjj:::j::j:jj:::j::11~ggrr.9Pll::j:jj:j::jj::::jj:~lt~7~&197:
FEDERAL COST
I $1,306,169 I $1,306,160 I $1,343,152
STATE COST
LOCAL COST
$326,542
$326,540
$335,788
$4,944,351 $4,944,351 $3,955,481
$0 $988,870
DOT DISTRICT # 7
CONG.DIST.
5,13 I ROC
ARC
.....
00
CAPITAL SCHEDULE FOR COBB COMMUNITY TRANSIT Section 5307
PI::SCRIPTI~Qti!;;\~.... :. STIP#
/~jK;;',,,
ARC TIP#
Park and Ride Lots
Transit Center
Support Vehicles
Bus Stop Improvements
Transit Planning Program
Computer and Computer Related
Education/Training
Preventive Maintenance (including upgrades)
Capital Projects: Bus Replacement
Capital Projects: Paratransit Vehicle Replacement
Fare Collection System
Capital Projects: ATMS and Related Equipment
Capital Projects: Paratransit Operations
PROJECT COST
.,,'.
FEDERAL COST
STATE COST
LOCAL COST
FY05 TOO0583
'j;>FY06 ..... '.z-"'. ".. ,-",. :~:;,:,;.,}',~. ::.:-;.,{~," ..-.-.',. ,., ~~ -.,'-,
,...QOO934 "'.:, .. .-. , :~:', "',*',y,'<>$,,.,~.---_
AR-CO-5307A AR"CQ:-5307A
$0
$80,000
$50,000
$150,000
$160,000
$0
$25,000
$983,677
$90,000
$300,000
$0
$100,000
$10,000
$15,000
$2,000,000
$2,100,000
$2,673,929
$850,000
$600,000
$600,000
$25,000
$250,000
$0
$200,000
$627,000
$625,000
$6,260,929
$6;253,677
$5,008,743
$5,002,942
$626,093
$625,368
$626,093
$625,368
FYO':-' _>;:f:~"iiNfi>--<,-_,'_'
'f(fn~~~7
AR-CO-5307A $100,000 $200,000 $400,000 $351,144 $325,000 $100,000 $20,000
$2,200,000 $0
$850,000 $250,000 $874,428 $630,000
$6,a;t"fo572
$5,040,458 $630,057 $630,057
fOfA6,.:l~
';::471
/;,04
$180,000 $400,000 $560,000 $1,359,821 $715,000 $200,000
$45,000 $6,300,000 $3,523,929 $2,050,000
$525,000 $1,074,428 $1,882,000 $18,815,178 $15,052,142 $1,881,518 $1,881,518
DOT DISTRICT # 7
-1.0
CONG.DIST.
5,6,11 ROC
ARC
CAPITAL SCHEDULE FOR DOUGLAS COUNTY Section 5307
: !!::::::::~m?~~!:::::??~ ~~:::::::~~::~;~~:::Fm::~~.:~.::.::??::;::~;:::::fl19:~~;:::~:::~:::::::::::~:::~:~:::~::::~:::::ill!ill~g:?{
: : : impq,Q$~~::::::::::::::::::::::::~::::::~:mgqQ~2&.::::::::::::::::::::~::::::::::~~~::ig~;~:~~~~:::::::::~::J
::8~%QQi~:i)7:A .~Btggeggi~~:::~::::~Ecj?gt?B9t~::::
Transit Facilities
I
$589,682
$588,399
$617,060
:::gmQ4p.m:::~@::::::::::::::::::::::?::::::::::::::iii:::::::::: :::::::: ::::::::::::::::::::::::::::::]:::::::::~:::::~:::::i:R~~~~~gB:::::::::~:~:::::~:::::~?~~;~~~t_::::: ~;1fi;:gg
$1,795,141 $1,795,141
FEDERAL COST
I
$471,7461
$470,7191
$493,648 $1,436,113
STATE COST
I
$58,9681
$58,8401
$61,706
$179,514
LOCAL COST
I
$58,9681
$58,8401
$61,706
$179,514
DOT DISTRICT # 7
CONGo OIS1. 13, 11
ROC
ARC
oN
CAPITAL SCHEDULE FOR GWINNETT COUNTY Section 5307
:::::::::Ex])$:wlP::::::::::::FQ::::::::::,n::::::::::f:tt::~tN::::'::::::::::::U
:::: ::mQQQ~$i.:1*0HtQQQ~~1:::::I:::::::LQQ1g;~]:m
::p;;rW+$~QiAI:'8B;;wi$,~Qt~:Iw;m.t~\(\(~?9.7A:
Transit Facilities
I $6,570,716 I $6,721,817 I $6,334,978 $19,627,511
!ie"q~I$QmH~Q$.mm:!ii:i::<:':</<,::,:(I::I:i~~;$7P;71~]:,:,:,~~7g1;~1t:l@:::::$~;~~4J~!~' $19,627,511
FEDERAL COST
I $5,256,573 I $5,377,454 I $5,067,982 $15,702,009
STATE COST
I
$657,072 I
$672,182 I
$633,498
$1,962,751
LOCAL COST
I
$657,072 I
$672,182 I
$633,498
$1,962,751
DOT DISTRICT # 7
CONGo DIST.
7,10,13 I RDC
ARC
,N....
CAPITAL SCHEDULE FOR GWINNETT COUNTY Section 5309
DESCRIPTION
StIP#3F[ ',;:0;'
.
-v ,
y
Gwinnett Bus Maintenance Facility (Land
Purchase & Construction)
,PROJECT COST
FEDERAL COST
STATE COST
LOCAL COST
FY04 TOO0245
$495,015 $495,015 $396,012
$49,502 $49,502
FY05
>i: "
$0 $0 $0 $0 $0
FYO'6
}':
""
' TOTAL
'N
'
"<r";
$495,015 $495,015 $396,012
$49,502 $49,502
DOT DISTRICT # 7
CONG.DIST.
7,10,13 ROC
ARC
tv tv
I....'''
.'
AUGUSTA
TRANSPORTATION IMPROVEMENT PROGRAM
FY 2005 2007
PROJECT DESCRIPTION:
CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80110110 SPLIT
AUGUSTA PUBLIC TRANSIT
FUNDING
PI#
SEC 5307
N/A
SEC 5307
N/A
SEC 5307
NfA
SEC 5307
NfA
SEC 5307
N/A
SEC 5307
NfA
SEC 5307
N/A
SEC 5307
N/A
SEC 5307
N/A
SEC 5307
N/A
SEC 5307
N/A
SEC 5307
N/A
SEC 5307
NfA
SEC 5307
N/A
SEC 5307
N/A
SEC 5307
NfA
TIP # TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229
PROJECT# N/A N/A N/A N/A N/A NfA N/A N/A N/A N/A N/A N/A NJA N/A NJA N/A
CAPITAL ITEMIDESCRIPTION 2 Transit Vehicles <30ft 5 Paratranslt Vans 1 Small Truck 1 SUV
Preventive Maintenance Tire Leasing
ADA Expenses Shop Equipment Security/Surveillance Cameras Management Training Braille Embosser Braille Translation Software Paratranslt Certification Software Mobile Data TermlnallAutoVehicleLoc. New Phone System Rehab/Renovate APT Facilities
UNIT COST $250,000 $50,000 $15,000 $40,000 Varies Varies Varies Varies $10,000 Varies Varies Varies Varies Varies Varies Varies
FY05 $500,000
$15,000
$900,000 $27,500
$250,000 $12,500 $10,000 $25,000 $5,400 $4,300 $55,200
$181,700 $33,000
FY06 $50,000 $40,000
$900,000 $250,000
$25,000
$1,500,000
FY07
TOTAL
$500,OO~
$200,000
$250,000
$15,000
$40,000
$900,000
$2,700,00
$27,500
$55,000
$250,000
$750,00
$12,500
$25,000
$10,000
$25,000
$75,000
$5,400
$4,300
$55,200
$181,700
$33,000
$1,500,000
SEC 5307
N/A
TOO0648
NJA
Construct Transfer Center South Augusta Varies
$1,000,000
$1,000,000
TOO0913
T001229
SEC 5307
N/A
TOO0648
N/A
Contract Contingencies
Varies
5100 e80
5188250
570750
535998
TOO0813
T001229
I"RQ'Je:C; f;:;$:T::::: :::::::::::;::::::::::::::::::::::: ...;.:.:::.::..:..:.:.: :;::::::::: ::::::::::::::: ::: :::::: :~;1
;.
:U
; ;::: : :.0,
FEDERAL COST
$1,696,464.0 $3,162800.0 51,188,600.0 $6,047 664.0
tv
(,;.)
STATE COST LOCAL COST
$212,058.0 $212058.0
$395,325,0 $385325.0
$148,575.0 $148575.0
$755,958.0 $755858.0
DOT D/STRICT#:
2 CONGoD/ST.: 8& 12
ROC:
CSR
TRANSPORTATION IMPROVEMENT PROGRAM
FY 2005 . 2007
OJECT DESCRIPTION:
OPERA TlNG ASSISTANCE SCHEDULE FOR PUBLIC TRANSIT
RURAL RICHMOND COUNTY
OPERATING PERIOD
FISCAL YEAR 2005
TIP# :1 FUNDING II OPE~;ING
T000673 I SEC 53111
TOOO964 TOO1197
FY 005 $143,147
FY 2006
FY 2007
TOTAL $143,147
FISCAL YEAR 2006
T000673!SEC 5311
TOOO964 TOO1197
$152,214
$152,214
FISCAL YEAR 2007
TOOO673 TOOO964 TOO1197
SEC 5311
$159,614
$159,614
IDOTDISTRICT #
2
ItONGRESSIONAL DISTRICT #
N
~
TRANSPORTA TlON IMPROVEMENT PROGRAM
IPROJECT DESCRIPTiiiN;-
I
FY 2005 - 2007
'CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80110110 SPLIT
AUGUSTA PUBLIC TRANSIT
PITAL ITEM/DESC Transit Vehicles
'NIT COST Varies
Y05 II FY06 I
$500,000 I
I
FY07
I TOTAL I
I
$500,000
I SEC 5309 I N/A I T000649I N/A TOO0914
T001230
~
I
SEC 53091 N/A I TOOO649l
N/A
I
TOO0914
TOO1230
Transit Vehicles Transit Vehicles
I Varies I
I
I
I I Varies
I
$500,0001
I
I
I
I
I
I
$500,0001
$500,000 $500,000
e~T:c.Q.WIDI"'?::i::::{})):):)}::
FEDERAL COST STATE COST LOCAL COST
OT DISTRICT #:
$400,000.00 $50,000.00 $50,000.00 9 & 12
)QQ~l)o.l~Qo.~o.Q();@1
$400,000.0011 $1,200,000.001
$50,000.0011 $150,000.00
$50,000.0011 $150,000.00
RDC:
CSR
N VI
TRANSPORTATION IMPROVEMENT PROGRAM
FY 2005 2007
PROJECT DESCRIPTION:
CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80110110 SPLIT
RURAL RICHMON> COUNTY
SEC 5311
TIP # PROJECT# II CAPITAL/TEM/DESCRIPTION IIUNITCOsir--FYos:]1 FY06 I FY07 I TOTAL I
1 Shuttle Bus and Mobile
N/A T000672 N/A I
Radio
T000963
$52,500
$52,500
$52,500
T001196
SEC 5311
N/A T000672
N/A
T000963
T001196
SEC 5311
N/A T000672 T000963
T001196
N/A
2 Shuttle Buses and 2 Mobile
Radios
I $54,500
$109,0001 $109,000
$0.00 $42,000.00 $87,200.00 $129,200.00
$0.00 $5,250.00 $10,900.00 $16,150.00
LOCAL COST
II
$0.00 $5,250.00 $10,900.00 $16,150.00
IV
[DOT DlTRICT # : - - - -
2 __~ICONG~ DISL 9 & 12 '-R15C-:-
CSR I
0\
...........................
..
'
,
TRANSPORTATION IMPROVEMENT PROGRAM
FY 2005- 2007
PROJECT DESCRIPTION: OPERATING ASSISTANCE SCHEDULE FOR PUBLIC TRANSIT
RURAL COLUMBIA COUNTY
OPERATING PERIOD
FISCAL YEAR 2005
TlP#
FUNDING
I
I
I
TOO0673 SEC 5311
TOOO964
T001197
OPERATING CAP
II
FY 2005
II
FY 2006
II
FY 2007
I TOTAL
II
$107,595
$107,595
FISCAL YEAR 2006
TOOO673 TOOO964 TOO1197
SEC 5311
$114,282
$114,282
FISCAL YEAR 2007
TOOO673 TOOO964 TOO1197
SEC 5311
$116,992 $116,992
p.RQUeCT:CQST:;/ ;;::;};:::(::::: ::::;:))$1(tiI5~$ ?;;;;;:;:??$W~4a.~~ ;::);:::;::;;;)$iM~r~~~ ;?:::):;:?$a~~::~~s:
FEDERAL COST
$51,154
$56,587
$59,699 $167,440
LOCAL COST
$51,154
$56,588
$59,699 $167,441
SUPPLEMENT IDOT DISTRICT #
$0
$0
$0
2
I CONGo DISTRICT #
$0 9
tv
-....J
TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 2007
PROJECT DESCRIPTION:
CAPITAL SCHEDULE FOR PUBLIC TRANSIT A T 80/10/10 SPLIT RURAL COLUMBIA COUNTY
FUNDING
II PI#,I TIPtf,IPROJECT#11 CAPITAL ITEM/DESCRIPTION II UNITeaST II FY05 II FY06 II FY07 II TOTAL
1 Standard Van and 1
I I SEC 5311 I N/A IT000672 N/A
Mobile Radio
I $29,500 I $29,500 I
I
I $29,500
TOO0963
T001196
SEC 5311
I N/A T000672I N/A
T000963
T001196
SEC 5311
I N/A T000672/ N/A
T000963
T001196
STATE COST LOCAL COST DOT DISTRICT#:
$2,950
$2,950
2
IICONG.DIST.:
$0 $0 9
$0 $0 ROC:
$2,950 $2,950 CSR
N 00
TRANSPORTA nON IMPROVEMENT PROGRAM
FY 2005 2007
PROJECT DESCRIPTION:
CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80120 SPLIT
RICHMOND CO. SERVICE AGENCIES
FUNDING SEC 5310
PI#
I TIP # I PROJECT # II CAPITAL ITEM/DESCRIPTION I UNIT COST I FY05
N/A
TOO0650
N/A
For Purchase Of Services
$74,363
TOO0915
T001231
FY06
FY07
TOTAL $74,363
SEC 5310
N/A
TOO0650
N/A
TOO0915
T001231
For Purchase Of Services
$78,081
$78,081
SEC 5310
N/A
TOO0650
N/A
TOO0915
T001231
For Purchase Of Services
$81,985
$81,985
PRP4J;CTCP$.T::= ::=:,,::=)?: :)r) :":,:\,:,i, r:=( :=:':"$!4;1!&:~~QQ
rEDERAL COST
$59,490.40
STATE COST
$14,872.60
I
IDOT DISTRICT #:
2
IICONG. DIST.:
.7~;Q.$tW.Q '::r$at'9.$~Qq: ::=$~~4~;Qij
$62,464.80 $65,588.00 $187,543.20 $15,616.20 $16,397.00 $46,885.80
9 & 12
RDC:
CSR I
tv
\0
'.
BRUNSWICI(
OPERATING ASSISTANCE SCHEDULE FOR BRUNSWICK MPO Section 5307
STIP# ;;2 OPERATING PERIOD
TQ,Q0651
\
' ;"
FY05
TOOO916
,rv os
,
ti'OO123? ,,,,-=.. __,,__ ,~>_._,_"_,_: c__,, .. . . . . . . . ,:: ..
i;;:,
':>:"~-fV: Y., ,. -' ........ -~:~Sy!'
. FY07
";
"\
,>,;;;'C' " i ;
TOTAL
July 1, 2004 - June 30, 2005
$0
$0
July 1, 2005- June 30, 2006
$513,952
$513,952
July 1, 2006 - June 30, 2007
$513,952 $513,952
,PRQJECT;I"COS""fi;;\
,.,c- "......
.. .. :"Y~:...
..": : <
FEDERAL COST
LOCAL COST,
:~! ,'~~t;1
;'~J
"!I~O
;):$513:~52
;;;li:;;14$1513','952; ' "")X:.':." c. ~;:::"d':~,,__ '
~\$1lQ~7,904i
$0 $218,798 $218,798 $437,596
$0 $295,154 $295,154 $590,308
DOT DISTRICT # 5
CONGo DIS.
1 ROC
CG
ow
CAPITAL SCHEDULE FOR BRUNSWICK MPO Section 5307
DESCRIPTION
,<'-',-' ~" , - -.:-:>,
'0
<,5TIP#
FY05 T000652,
FY 06;;
V'ifFf
TOO0917
~"FY 07
~~~,-~,
w
'001233,
TOT~L
"',
""
Facility Leasing Three 30' Transit buses Office Equipment Two Vans Capital Maintenance Continqencv
$0
$33,926
$33,926
$67,852
$0 $169,600 $169,600 $339,200
$0
$0
$0
$0
$0
$45,074
$45,07'4
$90,148
$0
$11,200
$11,200
$22,400
$0
$17,074
$17,07'4
$34,148
PROJECT COST , FEDERAL COST LOCAL COST STATE COST
$0 $276,874 $276,874 $553,,748
$0 $221,499 $221,499 $442,998
$0
$27,687
$27,687
$55,375
$0
$27,687
$27,687
$55,375
DOT DISTRICT # 5
CONG.DIST.
1 ROC
CG
.w....
CAPITAL SCHEDULE FOR BRUNSWICK MPO Section 5310
'sTip #",,,
5310 Proaram Services
$31,461
$33,034
$34,686
$99,181
FEDERAL COST LOCAL COST STATE COST
DOT DISTRICT # 5
$25,169
$26,427
$27,749
$6,292
$6,607
$6,937
CONG.D1ST.
1 I ROC
$79,345 $19,386
CG
W
N
COLUMBUS
CAPITAL SCHEDULE FOR COLUMBUS TRANSIT SYSTEM
Section 5307
~=~= ::rt .FY06 iI(( iii mq~Q~j~>::i
:;:::::::~:.;~~~:::ii::::_
Preventive Maintenance
$447,020
$469,370
$492,839
$1,409,229
Tire Leasing (Tires, Tubes, Materials)
$60,000
$63,000
$66,150
$189,150
Engine Rebuild Program
$80,000
$84,000
$88,200
$252,200
Transmission Rebuild Program
$60,000
$63,000
$66,150
$189,150
Bus Stop Signs, Poles, Benches and Trash Cans
$15,000
$15,300
$15,610
$45,910
Paratransit Operations
$0
$52,000
$52,000
Training
$0
$32,000
$32,000
Lights at Body Shop (Upper Shop Pits)
$8,000
$8,000
Security Cameras for Buses (15)
$40,000
$80,000
$120,000
Low Profile Axle Jack Air Powered (1)
$1,200
$1,200
Automatic Announcement System (20)
$95,000
$95,000
Swipe Card Ticket Vending Machine (1)
$60,000
$60,000
Golf Carts (2 or 3)
$28,240
$28,240
Mini Bus w/Camera (1)
$180,000
$180,000
35' Low Floor Bus w/Camera (4)
$0
$269,695
$833,360
$1,103,055
Parts Room Shelves/Utility Shelves
$8,500
$8,500
Lockers for Shop (Uniforms)
$4,000
$4,000
Service Vehicle
$25,000
$25,000
Construction Storage (ADA)
$0
$64,750
$64,750
Facilities equipment
a erational E ui ment
$0
$4,750
$30,000
$34,750
$0
$73,750
$130,000
$203,750
. ( (:t:~jHj1:;~~ij:: ::::%:11;iii;~1:~::: ::::::::::::::::~:j~1~~;~P~:: ::::::::::14a~.;~#:
FEDERAL COST
$889,568
$1,017,292
$1,377,847
$3,284,707
STATE COST
$111,196
$127,162
$172,231
$410,588
LOCAL COST
$111,196
$127,162
$172,231
$410,588
ww
DOT DISTRICT # 3
CONG.DIST.
2,3 RDC
LC
CAPITAL SCHEDULE FOR COLUMBUS TRANSIT SYSTEM Section 5309
~(ll:~1!~ii"i !=ji;;::!"%~ ;ii{~ ~=~
30 Ft. Transit Coaches (3 <30 Ft. Transit Coaches (2)
FEDERAL COST LOCAL COST STATE COST
$750,000 $250,000
}" J1;ppgl9QQ
$800,000 $100,000 $100,000
,,~i,;:mlilll_wiitili!
$0
$01
$750,000
$250,000
':::":::::::::~:~:::::i1~~Q9P~g~P
$0
$0
$800,000
$0
$01
$100,000
$0
$01
$100,000
DOT DISTRICT# 3
CONG.018T.
2,3 I ROC
LC
w
~
CAPITAL SCHEDULE IN COLUMBUS FOR ELDERLY AND DISABLED Section 5310
Purchase of Service Purchase of Service Purchase of Service
FEDERAL COST STATE COST
DOT DISTRICT # 3
$74,363
$74,363
$78,081
$78,081
$81,985
$81,985
$.:7~;~~~$:?~;Q~1 .$::.:::::::.i1;~~~:::{:\ ::.::$.l?~4~i~~
$59.490
$62.465
$65,588
$187,543
$14,873 I
$15,616 I
$16,397 I
$46,886
CONG.DI5T.
2,3 I ROC
LC
w
VI
GAINESVILLE
ACCESS TO JOBS FOR GAINESVILLE SECTION 3037
DESQ,RIPTIQ,N.
STIP;#
",'
'i>" ' ;~:~"
F't:",Q
FYQ6
~;/}{&')-1' , ;'.<: I" ,,"m",,'
TOOO674
TOQ0944
FY07', rqTAL
;<'::::::t\,,' _ ,-,'::%$'4';}0;
,;]1001253
~
4:':);~"
"'"
Access to Jobs/Reverse Commute Program
$400,000 $400,000 $400,000 $1,200,000
TOTAL
\+\
Federal
State
Local
DOT DISTRICT # 1
>:"il))
;:
$~QO,()O()~ I~ $4Q'Q';()()O
i$4()O'06'f)y "..
., .... -.;::-,
$f2, 0,;(.").',oM
$200,000 $200,000 $200,000 $600,000
$0
$0
$0
$0
$200,000 $200,000 $200,000 $600,000
CONG.DIST.
4,6,11 ROC
ARC
UJ
0\
OPERATING SCHEDULE FOR PUBLIC TRANSIT AT SO/50 SPLIT
GENERAL PUBLIC DEMAND RESPONSE:
Title 49 USC 5311
FY 2005-2007 Transportation Improvement Program
HALL CO.
FY 05
FY 06 FY07 Total Cost
PI#
TOOO0702 TOO0962 T001195
F';~OJEGT co,t
$i:;
'$1,1S~22 "$,i~~6, 352,462
,;-jtff! ' , .' ;a~;~~;d
$'.$96,2"12
41"S,,1
FEDERAL COST $ STATE COST $
176,231 $ 198,121 $ 208,209 $ 582,561
-$ -$ -$ -
LOCAL COST DOT DISTRICT 1
$ 176,231 $ 198,121 $ 208,209 $ 582,561
Cong.Dist. 4,6,11 ROC
ARC
VJ
-....l
Federal State Local DOT DISTRICT# 1
GAINESVILLE SECTION 5307 OPERATING
iiiiiiii~I~~~ ill:!!:l!:
$201,971
$201,971
$605,913
$100,986 $0
$100,986 CONGo DIST.
~~~1i~~~1::H:i:iiii.i.iii;.14:1~~1\~iiil:i:.:: ::: .:$~g$;~1~
$100,986
$100,986
$302,957
$0
$100,986 I
$0 $100,986
$0 $302,957
4,6,11 I ROC
ARC
w
00
CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80/20 SPLIT
GENERAL PUBLIC DEMAND RESPONSE:
Title 49 USC 5311
FY 2005-2007 Transportation Improvement Program
HALL CO.
FY05
FY 06 FY 07 Total Cost
PI#
TOO0701 TOO0961 T001194
PRQJECT COST FEDERAL COST
$0 $ 138,QQO $ ~~,OOQ( $,aG3;!,QQO
- $ 110,400 $ 75,200 $ 18fi,600
STATE COST $
- $ 4,500 $ 4,500 $ H,OOO
LOCAL COST $
- $ 4,500 $ 4,500 $ H,OOO
DOT DISTRICT 1 Congo Dist 4,6,11 RDC
ARC
w
\0
SECTION 5307 CAPITAL GAINESVILLE
<;, i + : / . J \ i
"
c,
DESCRIPTION.
;;.
<i....1. \. iii
.
, ii""i'lf" .. t( ,;~, .'(
51=IP #.
'1" "*
''1-''"
V"
,
'f ""i'
<. t 't <. ....'1-'. ".1 i .': .. i"
"'i' :" .,c',' .<:.. 'ii
' FY05
;FY06 ,FY07'
..' " +i,i
<t' ','~j 'I, .+ 'iF ''',
1+ " ' , , 9 ..
.: i TOO1258(( :; 11001259 "TOOj1,260 Ii..
'" ' / ..' .:,c.
TOTAL
Purchase Four (4) Twenty-five foot Expansion Vehicles
$565,300 $565,300 $565,300
$1,695,900
Fare Boxes
$180,000 $180,000 $180,000
$540,000
Shelters
$20,000 $20,000 $20,000
$60,000
Shelters
$60,000 $60,000 $60,000
$180,000
Shelters
$20,000 $20,000 $20,000
$60,000
Signs
$2,500
$2,500
$2,500
$7,500
Brochure Holders
'F' 'i,_
,
Total
Federal
.,....., .....
'I' """
j '.
$2,000
$2,000
$2,000
$6,000
"Tt V
,
<$~~9't800 '$8~g8Bdo .p ~8~9;86p IF
, $2,~4g:;490
"
.1..: _._,
$679,840 $679,840 $679,840
$2,039,520
State
$84,980 $84,980 $84,980
$254,940
Local
DOT DISTRICT # 1
.p..
o
$84,980
Cong.Oist.
$84,980 $84,980
4,6,11 ROC
$254,940
ARC
'.',
MACON
ACCESS TO JOBS FOR MACON Section 3037
DESCRIPTION
STIP#
,
<'
Access to Jobs/Reverse Commute Program
TOTAL "
Federal
"
<'
,
State
Local
DOT DISTRICT # 3
FY05 TOO0678
PY06'
FY07
TOO0943 TOO1252 ~"
TOTAL
$1,167,700
$0
$0 $1,167,700
$1,167,700 $583,850 $0 583,850
CONG.OIST.
(\$0' v' ">/-"$0
$0
$0
$0
$0
$0
$0
3,8 ROC
"$1;1 61,too
$583,850 $0
583,850 MO
,~ .....
CAPITAL SCHEDULE FOR MACONBIBB COUNTY TRANSIT AUTHORITY
Purchase 30 ft transit buses (3 Administrative Vehicles (2) Purchase Paratransit Van (1) Lease Payments on Vehicles (3 buses, 2 trolleys, 1 van
FEDERAL COST STATE COST LOCAL COST
DOT DISTRICT # 3
~ll~I\_i=~;I~
$585,000
$585,000
$585,000
$1,755,000
$25,000 I
I
$25,000
$50,000
$40,000 I
$40,000
$80,000
i,812 I
$155,812
$40,000 I
I
I
$40,000
::~::::!~Q:;~1g::f::.:::::::::~Z~g~~lg::.1:::::::;::::i~9~~~1@:::IH::.;:;:~gi~~g;I::::
$644,650 I $80,581 I $80,581 I
$624,650 I $78,081 I $78,081 I
$644,650 I $80,581 I $80,581 I
$1,913,949 $239,244 $239,244
CONGo DIST.
3,81RDC
MG
~
tv
ft ~
OPERATING ASSISTANCE SCHEDULE FOR MACON-BIBB COUNTY TRANSIT AUTHORITY SECTION 5307
:::::[QPpiQi::::::::::::::::
::::::::::::!:!:FM:9.~! ..!:::!.::!:.:!:!
(07/0104 - 06/30/05)
$2,670,152
$2,670,152
(07/01/05- 06/30/06)
$2,723,555
$2,723,555
FEDERAL COST LOCAL COST
$2,778,026
$2,778,026
.:0Ig;~lP~1.~I:.::!!:!::!;g~t~~;~~~!I::.::"!:.:I~~I~!;pg~:::I:::::::::"~,,~~~:~~~t~I:::
$1,335,076
$1,361,778
$1,389,013
$2,561,362
$1,335,076
$1,361,778
$1,389,013
$5,610,371
DOT DISTRICT# 3
CONG.DIST.
3,81 ROC
MG
.j:>.
w
CAPITAL SCHEDULE FOR MACONBIBB COUNTY TRANSIT AUTHORITY SECTION 5309
Qe$Q~,ettf~N.i.:.:!:.::"::::i::!:):::::i:)::i:)ii:!:ij,!!!ii!ii:i::::::.
::i:iiiiij~J1i:i::i::::ii:i i;ii;i;:::~g~1:~~1:::!::::!i:ii:::
:'!))::i)::~M=:~~:)i::)::::.::)!:! i:'::i::'))!':::!:'!i:'!F:M)!~;t);,:!:!:')"':i:':"':ir:':):i::iii::)i:itillti!i:i:::):):):):i::
Purchase three 30 ft transit buses
$285,000
$285,000
$285,000
$855,000
kgbJS6mdbsm::::::::::;:\:;;::::!::::;::;:::::::::i:i:i;::::.:::: :i::i:i:i:::H!!ii.::::i:::i.I:i:::i:i!i!$.~~~JI.~~iiHii.i.:i:ii:i:i$.i$.~~iUQ::.!j.::"!:~i:.i::iii!~I;~iu:i:)I!!!.!::::i!i:::: .i:ii$~~$l~~iii
FEDERAL COST STATE COST LOCAL COST
$228,000 $28,500 $28,500
$228,000 I $28,500 I $28,500 I
$228,000 I $28,500 I
$684,000 $85,500
$28,500 1$85,500
DOT DISTRICT # 3
CONGo DIST.
3,8IRDC
MG"
t
CAPITAL SCHEDULE FOR MACON-BIBB COUNTY TRANSIT AUTHORITY
Purchase one alternative fuel vehicle Multi-modal Terminal Station Renovation Terminal Station Roof Rehabilitation
T001282 T001280 T001281
$294,678 $4,325,791
$332,004
..:..::::::.::::::::.:t... .. gi~4.~'!i:i&iji':::.ii
-.:.: :'.'.'.'.':'.':':':':':':':':':':'::::. :::::::::::::::::::ill::::::::::::::::::::::.I.i:.:..ii:.:$.~~~'$~i;!7~ii::
FEDERAL COST
$3,961,978
STATE COST
$0
LOCAL COST
$990,495
DOTDISTRICT# 3
CONG.DIST.
$294,678 $4,325,791
$332,004
3,8IRDC
: :.:::.::::Ji$,~~p:I~~Jii
MG
~ VI
CAPITAL SCHEDULE IN MACON FOR ELDERLY AND DISABLED Section 5310
~; t ' l -
Purchase of Service
$71,502
$71,502
Purchase of Service Purchase of Service
$75,078
$78,831
$75,078 $78,831
FEDERAL COST STATE COST
$57,202 $14,300
$60,062 $15,016
$63,065 $15,766
$180,329 $45,082
DOT DISTRICT # 3
CONG.DIST.
3,81RDC
MG
+::-
0'\
OPERATING ASSISTANCE SCHEDULE FOR NONURBANIZED AREA TRANSIT (Jones County)
SECTION 5311
OPERATING 'EJUOlJ
FY 2005
FY 2006
FY 2()07
TOTA,~
FISCAL YEAR 2005
$114,396
$114,396
(111105-12131105)
FISCAL YEAR 2006
$114,532
$114,532
(111106-12131106)
FISCAL YEAR 2007
$121,728
$121,728
(111107-12131107)
PROJECT COST
$114,396
FEDERAL COST
$57,198
LOCAL COST
$57,198
Project Identification # hDOT DIST. Ii
T_n~ n~ 070 3
3&8
CAPITAL SCHEDULE FOR NONURBANIZED AREA TRANSIT (Jones County)
SECTION 5311
$40,000
$41,000
$0 $81,000
PROJECT COST.
'$79,(100
EDERALCOST
$63,200
STATE COST
$7,900
LOCAL COST Project Identification #
$7,900
T000965 II TOO 1198
~
'I DOT DIST.
I
CONGo DISTRICT #
3&8
-:J
'.
ROME
CAPITAL SCHEDULE FOR ROME TRANSIT DEPARTMENT Section 5307
Transit Coaches Bus shelter/bench renovations and additional purshases
$480,000 $20,000
:mQQ1~4~i::i:ii:,
$540,000 $250,000 1 $1,270,000
$20,000
$20,000
$60,000
One(1) Trolley bus w/lift two-way radio, fare box
$300,000 1 $300,000
One (1) Administrative support vehicle
$25,000
$25,000 1 $25,000 1 $75,000
Maintenance support truck
$25,000
$25,000 1 $25,000 1 $75,000
Fareboxes for buses
$50,000 1
1 $50,000
security and surveillance cameras
$50,0001
1 $50,000
Paving/repair parking lot Office Equipment/Furniture, etc. Maintenance Tools/Equipment
$20,000 I .$15,000 I
$75,000 1
$10,000 I $20,000 I
1
$10,000 I $20,000 I
$75,000 $40,000 $55,000
Maintenance Items (capital parts) FEDERAL COST
$50,369
$95,000
$80,000 $225,369
~i:::i::i$~~~~~liiii::iiiiii:i:$.~~9~~~9:il i:iiiiil:lililii$7~g19ppiil iii:i:I:~~~I!~~I~i:i:
I $508,295
$728,000
$584,000 $1,820,295
STATE COST
$63,537 1 $91,000 1 $73,000 1 $227,537
LOCAL COST
$63,537 1 $91,000 1 $73,000 1 $227,537
+>-
00
DOT DISTRICT # 6
CONG.DIST.
11 IRDC
CV
OPERATING ASSISTANCE SCHEDULE FOR ROME TRANSIT DEPARTMENT Section 5307
"",:'<:':::'}:}I::::::::!::':::::!:::::i:EI:::ge:::;',:::,T::,,:h:::!::.]::::9:::::L::::':~::::Ei~::!!pf:::::l!:!'::T:!:::h::!::H~:!:::~!::::_::::::1':'mJ!!1Qp,:1:::::~,:!,::!::::!.!t::::!:!:!:'!:':":!:'lliliBE::':::;':::::.:'::'!
(01/01/05 - 12/31/05)
$ 1,934,330
$ 1,934,330
(01/01/06 - 12/~1/06)
$ 2,031,015
$ 2,031,015
(01/01/07 - 12/31/07)
$ 2,15,7,970 I $ 2,157,970
1:::'B~~4.IRn::'Rqlu:::'::::::!:::::::':::::::::::::::::,::::::::::::::::::::::::::::::::::::!::::::::::,::::::::::::::$:::::::::":':::::1~1~!~~~9:::::!I:,::::::::::gi@~:1::~91:::,:::I:::::::::I~I:~iP~~jfQ::::::::::$.:::::::::::pjl:g~~$.:1:p:,:::1
FEDERAL COST
$ 631,766 $ 631,766 $ 62,1,766 $ 1,895,298
LOCAL COST
$ 1,302,564 $ 1,399,249 $ 1,52:6,204 $ 4,228,017
DOT DISTRICT # 6
CONG.OIST.
111 ROC
CV
+:-
\0
CAPITAL SCHEDULE FOR ROME TRANSIT DEPARTMENT
FEDERAL COST LOCAL COST STATE COST
DOT DISTRICT # 6
$1,000,000
$0
$0 I $1,000,000
$250,000
$250,000
:!:!ij;~$~;~~!~:!!: ~!;:!!!:!!~i~~j:ii:p,::i!:"::!::;!:!i~$.p~i9g::::.:!::~!1;~~:9~99:9:i,1
$1,000,000 $125,000 $125,000
$200,000 $25,000 $25,000
$200,000 $1,000,000
$25,000 I $125,000 $25,000 I $125,000
CONG.OIST.
11 I ROC
CV
oVI
CAPITAL SCHEDULE IN ROME FOR ELDERLY AND DISABLI~D Section 5310
eg1ir-N~i::eJ;g($pii:::
iiiiiiii;l;qQ~Ii!i!iiilii:ill~lill!!!"!!.
Purchase of Service Purchase of Service Purchase of Service
$42,901
$42,901
$45,047
$45,047
$47,2(39
$47,299
FEDERAL COST STATE COST
$34,321 $8,580
$36,038 $9,009
$37,8:391 $9,41301
$108,198 $27,049
DOT DISTRICT # 6
CONGo DIST.
111RDC
CV
-VI
SAVANNAH
TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 - 2007
CAPITAL SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY (50/50)
r',,, "'>FUNDING .: ,11:,:'' DESCRIPTION . .: .11
STIP#
UNIFCOST:qll. . FY2005 ".',:.ill :':FY2006>II>FY200ZII '<TOTAL>I
TOO0675
TOO0942
T001251
Section 3037
Job Access
N/A
$4,850,348
$1,500,000
$2,000,000
$8,350,348
!PROJECTCOST ........
IFEDERAL COST LOCAL COST lOOT DISTRICT #
II... ,::$4.85o,34811 """"''$1;500;0001/$2;000;00011<$8,350,3481
$2,425,174 II
I
$2,425,17411
5I1CONG. DIST.
1, 12
$750,000 II
$750,000 II
IIRDC
$1,000,000 II
$1,000,000 II
CG
$4,175,174 $4,175,174
I
VI
tv
TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 - 2007
CAPITAL SCHEDULE FOR CHATHAMAREA TRANSIT AUTHORITY (80110/101
I
I < ..FUNDING< 11<
I
ISTIP #
DESCRIPTION
<.<IIUNITCOST 11 . FY2005<1I . FY2006)<IIFY2007<U>TOTAL. . ,
I
I
T000668
I
T000928
I
T001247
I
I
ISection 5307
Communications
VARIES
$175,000
$225,000
$275,000
$675,000
Section 5307
Maintenance Tools/Equipment
VARIES
$175,000
$200.000
$225,000
$600.000
Section 5307
Transportation Development Plan (TDP)
VARIES
$150,000
$100.000
$100,000
$350.000
Section 5307
Preventive Maintenance
VARIES
$880.341
$800.000
$900,000
$2.580.341
Section 5307
IService Vehicles
I
VARIES
I
$170.000
$100.000
$50.000
$320.000
IfPSQ4E:OJCQOST
rEDERAl COST STATE COST LOCAL COST IDOT DISTRICT #
I ..... > ............... ><. . .> ICI>{$h!)!)O.:.H1LII.....>..) .$1.44!)~QQOII)$1i!)!)Q.oOo II< .....)$4'SZSia4tl
$1,240,273
$1,140,000
$1,240,000
$3,620,273
$155.033
$142,500
$155,000
$452.533
$155034
$142500
$155000 .
$452534
5I1CONG. DIST.
1, 12
IIRDC
CG
I
Vl W
TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 - 2007
CAPITAL SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY (80/10/10)
) ' "... FUNDING ".".."
.>bE$CRIPTION<> ' ) . . PNITCOST I. ...'"'.
STIP#
TOO0669
Section 5309 Bus and Bus-Related Facilities
NA
$5,495,170
Section 5309 Passenger Amenities
NA
$1,160,000
Section 5309 Intelligent Transportation System
NA
$1,250,000
Section 5309 Facility Modifications
NA
$1,914,745
Section 5309 Fareboxes
NA
$350,000
Section 5309 Centre Station
NA
$2,716,949
TOO0923 $1,000,000
$700,000 $500,000 $1,500,000 $200,000 $1,000,000
T001248 $1,000,000
$100,000 $500,000 $1,500,000 $200,000 $1,000,000
$7,495,170 $1,960,000 $2,250,000 $4,914,745
$750,000 $4,716,949
.~ 'f ~w
~
STATE COST LOCAL COST lOOT DISTRICT #
'$12;$$();$p@ .n))$4;~qQ;qqq.
$10,309,491
$3,920,000
$1,288,686
$490,000
$1,288,687
$490,000
51ICONG. DIST.
1, 12
IIRDC
$4i$QP;QQQi n.n$44MJ$()\$94
$3,440,000
$17,669,491
$430,000
I $430,000
$2,208,686
I $2,208,687
CG
I
FHWA
VI
~ I"" _ .._, I I _I I
I
0001771
!.)nitCQst I $1,000,000 I
4ff;F~deral&,.
( /)Ji; .~tater
$800,000 I
$100,000 I
$100,000 ,
$1,000,000 I
**MPC Does This One
TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 - 2007
CAPITAL SCHEDULE IN SAVANNAH FOR ELDERLY AND DISABLED (80/20)
I
FUNQINGH>II .'. ... DESCRIPTION.>ill
UNITGOST
II FY 2005 .. II\FY2006 .>II>PY2007<1I>TOTAL . 1
STIP#
TOO0670
TOO0929
TOOO1249
Section 5310
Miscellaneous Equipment
VARIES
$102,964
$102,964
Section 5310
Miscellaneous Equipment
VARIES
$108,111
$108,111
Section 5310
Miscellaneous Equipment
VARIES
$113,517
$113,517
IPRQ4E.OIQQ$Tt..n..}} ....... ......<......... i.>....>.11.. i./}$"1.02iQ64II<$"10l3/11"1ill??$"1"1.$iS"17UII.:$$g4;$$.2.tl
FEDERAL COST
$82,371
$86,489
$90,814
$259,674
STATE COST LOCAL COST
lOOT DISTRICT #
$20,593 $0
51ICONG. DIST. 1, 12
$21,622 $0
IIRDC
$22,703 $0
CG
$64,918 $0
I
VI VI
TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 - 2007
OPERATING ASSISTANCE SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY
FISCAL YEAR 2005
Section 5307
TOO0667
$10,892,827
$10,892,827
July 1, 2004 - June 30, 2005
FISCAL YEAR 2006
Section 5307
TOO0927
$11,219,619
$11,219,619
July 1, 2005 - June 30, 2006
FISCAL YEAR 2007
Section 5307
T001246
$11,556,200
$11,556,200
July 1 2006- June 30 2007
5~r~_,
-_:- _.::. . .. . . ..~~.. __!:. IPROJECTCOST.... ......................................................11 ><$10,892,827.11.(. $11,219161911 >. $1.1;556;20011(..<$33,668,6461
IFEDERAL COST LOCAL COST
$1,824,22511
$1,878,952
I
$9,068,602 II
$9,340,667
$1,935,321 II
$9,620,879 1/
$5,638,498 $28,030,148
lOOT DISTRICT #
51 CONGo DIST.
1, 12
I
1, 11
I
VI 0\
WARNER ROBINS
RURAL PUBLIC TRANSIT
TITLE 49 U.S.C. SECTION 5311
TRANSPORTA TlON IMPROVEMENT PROGRAM FY 2005-2007
IPROJECT DESCRIPTION:
I
OPERATING ASSISTANCE SCHEDULE FOR RURAL PUBLIC TRANSIT (PEACH COUNTY)
OPERATING PERIOD
FISCAL YEAR 2005 (1/1/05-12/31/05) FISCAL YEAR 2006 (1/1/06-12/31/06) FISCAL YEAR 2007 (1/1/07-12/31/07)
oEJI
'389(J05 i
. . - ~.~--~
Rural
Transit
ICI::J~ 2005
2006
2007
.'dxt<;j ),,1,,,;,,p1~.<,,,4I1di~
$138,410
~'._~~fl.gp~.:._ Rural Transit
{ ..
..3.~~QQ7 .. Rural Transit
. ijw.la~ii.b.~::.:: ::::::t::::::;;:;.::::::::
FEDERAL COST FAREBOX LOCAL COST !DOTDISTRICT #
"y "$142i;905
1----
...~ .... _ -
I'"
. . 'f
I:; .~J~.,I~}
$142,905 $152,735
$138,410 $55,364 $27,682 $55,364 3
$142,905
$152,735
$434,050
$57,162
$61,094
$173,620
$28,581
$30,547
$86,810
$57,162
$61,094
$173,620
CONGo DISTRICT # 1 & 3
VI -.l
CAPITAL SCHEDULE IN WARNER ROBINS FOR ELDERLY AND DISABLED Section 5310
::;!!m~~n~~o:ii.:ir j:ji;iiiii:e.:I~:.:.j:j.::::
Purchase of Service
$28,601
$28,601
Purchase of Service
$30,031
$30,031
Purchase of Service
$31,533
$31,533
:1!f.)wlII!~~~~:::::i:::::::.::!:i.i.!.:iI:i:1i:.:.i:"::.i:I:i::.:!:.i:.:.:Iii:l:i.. :iii.ii.liliiiiii::I;ii~~~~~:i:::::i:.i:i:.::: -,:I~~:~~~.1H::i.::.:;:.:::::I:.I:I~Ii.i~~~I:ii:i::::::l:;:il~:~~~:~~
FEDERAL COST
$22,881
$24,025
$25,226
$72,132
STATE COST
$5,720
$6,006
$6,307
$18,033
DOT DISTRICT # 3
CONGo DIST.11,3
ROC
MG
VI 00
RURAL PUBLIC TRANSIT
TITLE 49 U.S.C. SECTION 5311
TRANSPORTATION IMPROVEMENT PROGRAM
FY2005-2007
\PROJECT DESCRIPTION:
I
I
CAPITAL SCHEDULE FOR RURAL PUBLIC TRANSIT AT 80110110 SPLIT (PEACH COUNTY)
FUNDfNG RURAL TRANSIT
(1) Conversion Van with Lift,
RURAL TRANSIT I 3C90061 WRATS1-1812l I NONE I
RURAL TRANSIT I~~~()QZJ WRATS1-18(3) I NONE I
FEDERAL COST STATE COST LOCAL COST IDOT DfSTRfCT#:
TAL
$0
$0 $40,000
1/
I
$0
.$0:
$0
$0
-
I
I
$0
"7'~'
'?
$0
$32,000 $4,000
" $4,000 3ItONG. DfST.:
$0
$0
$0
$0
1 & 3 RDC:
--
$40,000
$32,000 $4,000 $4,000
MG
VI \0
RURAL TRANSIT PROGRAMS
CAPITAL SCHEDULE FOR STATEWIDE NONURBANIZED AREA TRANSIT Section 5311
P.l$tt{ljWfIPi$.mgJ$J$i@Meititifi))il$ne:~ri))p)i:it:Y:~U.Q$.if)[lfiiffiiii~.~J)Qi:)))qi))iiifit:Yi:~U.Qtif:)ii::iliifiii))TP.T.Aijft:?
1
Gainesville
2
Tennille
3
Thomaston
4
Tifton
5
Jesup
6
Cartersville
7
Atlanta
All
Supplemental
--
Ali Iintercitv Bus
T000701 $ 271,000
T000961 T001194 T000672 $
$
I
486,500
552,000 1$
I 282,000
$1,105,000
T000963 T001196 T000703 $
$
I
559,500
955,500 1$
I 661,500
$2,103,500
T000965 T001198
$
I
443,000 1$
I 176,000
$1,178,500
T000705 $ 1,003,000
T000967 T001200 T000707 $
$
I 394,000
3,350,000 1$
I 2,710,000
$7,063,000
T000969 T001202 T000709 $
$
I 759,700
172,400 1$
I 234,000
$800,400
T000971
T001204
N/A N/A N/A
$
~
1,324,600 1$
$0
I
I 751,700
$2,836,000
$0 I
$0
T000711 $ 300,000
T000973 T001206 T000713 $
$
I
1,567,729
300,000 1$
I 300,000
$900,000
T000975
$ 1,567,729
T001207 I
I
I $ 1,567,729 I $4,703,187
-~---
)i:ii::$$;$41i4~$.ii$::)1h~[$ii~~~)i:i$:n)p';~~j$~~tiri)i$1$.~$.~$. ;\mQ i
:HH\fffii$.4:Z:r~i14~ :f::::HH$.9.$.a2tJ~: HHHHH$.S::..4.~r~4~:HHH$1~1:aSI1:zQ
:::::fi$.~~4;it4~i::Hi:H/%$.$/.;.~;$z~ ::/:fi:::i:i::i)$.$.$.~;Z$~::::i::f$1i$Q~:h$.4~ i:)i:$;$~4a4~:t:::::ttt)$.$.$:~:i$~$.)::):t:)):$~:~:i~~:i: :t: :ii::::::$M~~~:i~4'l).
o01
OPERATING SCHEDULE FOR STATEWIDE NONURBANIZED AREA TRANSIT Section 5311
p!$TRip.1W;.O!$TRfOJHJAMg::)')::))::)))::.\$Tifti:) : ')'::)fM)ZQQ~)))::)):) ::::::)):EX:z.mi~E :.: )))):::::::::]i,1Yi.QijZ:: .,: :::::WQ:fAW: (:
1
Gainesville
TOO0702
$1,114,386
TOO0962
$1,217,220
T001195
$1,290,540
$3,622,146
2
Tennille
TOO0673
$1,858,137
TOO0964
$1,948,030
T001197
$2,116,086
$5,922,253
3
Thomaston
TOO0704
$1,816,117
TOO0966
$1,861,912
T001199
$1,386,109
$5,064,138
4
Tifton
TOO0706
$3,121,635
TOO0968
$3,288,474
T001201
$3,501,378
$9,911,487
5
Jesup
TOO0708
$1,094,822
TOO0970
$1,076,652
T001203
$1,153,509
$3,324,983
6
Cartersville
TOO0710
$3,249,445
TOO0972
$3,405,986
T001205
$3,542,737 $10,198,168
7
Atlanta
N/A
$0
N/A
$0
N/A
$0
$0
ALL SUPPLEMENTAL
TOO0712
$600,000
TOO0974
$600,000
T001208
$600,000
$1,800,000
!t9IAM:PQ$.:r.$:.:)://ii//? ':.":'::,"::': :: ''$.1\Z;~$41$4.~ :i/"U~;~~~h~rt.#' /::$.1;};~~~;~$~ ::)://$~~;Mli~art.~:
FEDERAL COST (50%)
$6,427,271
$6,699,137
$6,795,180 $19,921,588
LOCAL FUNDS (50%)
$6,427,271
$6,699,137
$6,795,180 $19,921,588
-0\
CAPITAL SCHEDULE FOR ELDERLY AND DISABLED (Statewide) SECTION 5310
[~!.$lqf({{'::f{ f $:If.iNft :':,:{:d:{:) 'f,y:t.ii:il~ f/::/!{(:{f,yiii:M:::fff, :t':::'f::::,:::t,y:;iii:ilit:ttltt::::::ji:itAC ::rr';;;
1 (15 Counties)
2 (13 Counties)
4 (10 Counties)
5 (11 Counites)
6 (15 Counties)
7 (11 Counties)
8 /16 Counites)
9 (15 Counites)
10 /14 Counties)
11 /18 Counties)
12 (9 Counties)
TOO0681 TOO0976 T001209 TOO0682 TOO0977 T001210 TOO0683 TOO0978 T001211 TOO0684 TOO0979 T001212 TOO0685 TOO0981 T001213 TOO0686 TOO0982 T001214 TOO0687 TOO0983 T001215 TOO0688 TOO0984 T001216 TOO0689 TOO0985 T001217 TOO0690 TOO0986 T001218 TOO0691 TOO0987 T001219
$205,927 $148,725 $151,585 $105,823
$71,501
$62,921 $102,964 $105,824 $111,544
$37,181 $480,497
$216,223 $156,161 $159,164 $111,115
$75,078 $66,068 $108,112 $111,115 $117,120 $39,040 $504,521
$227,035 $163,969 $167,123 $116,671
$78,831 $69,372 $113,517
$116, 67 1.l
$122,976 $40,992
$529,7471
$649,185 $468,855 $477,8721 $333,609 $225,410 $198,361 $324,593 $333,610 $351,640 $117,213 $1,514,7651
iiAt,q$t$:{{
,::::t$i;$1;i4)i~I::):$j;~~MMit:::::::):::::::f:nit4~;~Mlrt::::::f4;~~;:H$
FEDERAL COST (80%) STATE COST (20%)
$
1,267,5941 $
1,330,9741 $
1,397,5231 $
3,996,090
$
316,898 1$
332,743 I $
349,381 1 $
999,023
0\
ILOCAL FUNDS (0%)
01
01
01
0
N
APPENDIXC
MAPS
Georgia Rail Passenger Program and HSR Commuter Rail Lines Intercity Rail Lines Existing Passenger Rail System Urban Transit Systems Rural Transit System Bicycle / Pedestrian Governor's Road Improvement Program (GRIP) Metropolitan Areas
(((
( .i .r -.l ..i .: .s .c--.! .s .: --.! .: .: .: ...L _L-l ( ( Georgia Rail Passenger Program
Georgia Rail Passenger Program & HSR
Gulf Coast High-Speed Rail Corridor
j3JeenV~ ille
\
1
So uth-East High- Speed Rail Corridor
Augusta
cdS b Commuter lines
m, Intercity lines
Phase 1
Intercity Tier 1
_
.:. Dacula & Griffin
Albany, Savannah, Jacksonville
.:. Athens & Macon Other Intercity
Other Commuter
Augusta, Columbus, Greenville
Bremen, Madison, Canton
Senoia, Gainesville
1
~~ i ' W"Ir.ij
, (
(
(
<
(( ( (((( (((( ( ((
Georgia Rail Passenger Program
Commuter Rail Lines
Ca ~1'efl---j Gainesville
o .;-vccoa
Augusta
2
=.r::',
rn .
Georgia Rail Passenger Program
Intercity Rail Lines
~
sernen
o
<~
'J
G ree n vil l e
J\
o
I
../
l Ca~to" Oame.ivd!
I o
0'
O'I O:\:CO<l
"jy eul. (Jnens
!;t[a nta
Olson (
.I. I.
oI Senoia
_6 .I'j m'
J
\. JJ
(
tl
a r.on
L
'-
) '-COll {mou s
)
Ea.t m
"
Augusta 0 " \.
)
\
)
t
l
( o lit~lii'l .>S'il va n~~ h
r
0,)
( Amerlcus
r)
\
~
-_I
~
t"
l \ :::l
i
~
3es u ~7~
o<r
i) 'v
1J
. J~kSOnV'lIe
o
3
. .. GRC ~ ~ ~ , ~"
Existing Passenger Rail Service (AMTRAK)
E
sC:Il ..... cOJ
E...
rn
'- ~
To Greenville
Passenger Service
Passenger Station
--11II(0)---
To Columbia &
Charleston
Georgia Department of Transportation Office Of Intermoda l Programs July 1,2004
Jacksonville
URBAN TRANSIT SYSTEMS
M ROPOdTA AT
T sn A TH
(MARTA)
~ AREA
T
nT Sll (HAT )
en COv T'r r
DOJ LA ' COJ
(AT 5 ) A GJ TA PUB ~I C
5 11 TAA SI1 (APT )
I -S hAR l
SI1
MACOl'.-l:)lt~ CO r ...-. 1 ".. ' 11 A rH ITY {M TA}
CO,-
II 'iST -
TAA)
AREA T ' SIT AJTH R T't (C AT)
_bAN TfV'\l",.,11 SYST -
-,
Rural Public Transportation Programs
SECTION 5311
CD Cedartown
@ Canton
Unadilla
@ Vienna
Americus Social Circle
(j) Arlington
Dawson Sylvester
Statewide Bicycle Route Network & Locally Adopted Bicycle/Pedestrian Plans
___ Planned Statewide Route
o MPOplans
D Both MPO and other plan(s)
II] Plans in development
D Plans under consideration
GOOT Oltlce '" P1an" '"Q tv.lI03
4PO
{
Governor's Road Improvement Program
(GRIP) CURRENT STATUS
JANUARY 05
Ope n Unde r Construction Right of Way Preliminary Engineering No Activities
Georg ia MPOs Chattanooga and Urban Areas Boundaries
Dalton
Rome
o MPO Boundl:a~ri:e~s--...L-_-J__-l--~....._L-=:=:::::_~-J
1990 Urbanized Areas 2000 Urban Clusters _ 2000 Urbanized Areas
c=J GA Counties 'Oalton MPO Boundary r not yel detefTTuned"'j
+N
GeorgaI DOT O1Tice of PlamlllQ, Sl1B1Oo4