State Transportation Improvement Program 2005-2007 [2004]

....JJl' .....1'''' .

e..1),l

......>"1r))
,..e...J)))t'

.......e11t''>''

Fiscal Years 2005 2007



STATEWIDE TRANSPORTATION PLANNING PROCESS CERTIFICATION (To be submitted with each Statewide Transportation Improvement Program)

In accordance with Title 23 CFR 450.220, .the Georgia Department of Transportation hereby certifies that its statewide transportation planning process is addressing major issues facing the State and its non-urbanized areas, and is being carried out in accordance with the following requirements:

I. 49 U.S. Section 5323(k), 23 U.S.C. 135 and 23 CFR part 450.220;

II. Title VI of the Civil Rights Act of 1964 and the Title VI assurance executed by each State under 23 U.S,C. 324 and '29 U.S.C. 794;
III. Section 1101 of the Transportation Equity ACt for the 21st Century (Pub. L. 105-178) regarding the involvement of disadvantaged business enterprises in FHWA and FTA funded project (Sec. 105 (f), Pub. L. 97-424,96 Stat. 2100,49 CFR part 23);

IV. The provisions of the Americans, With Disabilities Act of 1990 (Pub. L. 101-336,104 State 327, as amended) and the U.S. DOT implementing regulation;

V. The provision of 49 CFR part 20 regarding restrictions on influencing

certain activities; and

.

VI. (for state with non-attainment and/or maintenance areas outside metropolitan planning area boundaries) sections 174 and 176 (c) and (d) of the Clean Air Act as. amended (42 U.S.C. 7504,7506 (c) and (d).

~ I1n --

~ rv. ..~(~ \ m_-. 4

... {\.
_

~

Commls oner

.

_ _9=- L:l -eJ e.J

_

Date



Please send any comments to:
Georgia Department of Transportation Office of Planning
No.2 Capitol Square Atlanta, Georgia 30334 Attention: Robert Hughes STIP Project Manager Phone (404)657-6699 Email Robert.Hughes@dot.state.ga.us



State Transportation Improvement Program



Introduction



STIP Public Involvement Process



STIP Funds by Category



STIP Financial Plan-Lump Sum Funding



Understanding STIP Entries



Map of Georgia



Index of Projects



STIP Projects



Appendix A

Glossary



Appendix B

Transit Tables



Appendix C (Maps)

Georgia Rail Passenger Program and HSR

Commuter Rail Lines

Intercity Rail Lines

Existing Passenger Rail Service

Urban Transit Systems

Rural Transit Systems

Bike/Ped

GRIP

Metropolitan Areas



State Transportation Improvement Program
Introduction
We are pleased to present the Fiscal Year (FY) 2005-2007 State Transportation Improvement Program (STIP) for Georgia. Please note that STIP projects from the Chattanooga Metropolitan Planning Organization (MPO), which include portions of Catoosa, Dade and Walker Counties in Georgia, only show projects for fiscal years 2005 and 2006 because the Chattanooga MPO will not adopt a FY2006FY2008 TIP until later this year.
The STIP includes Highway, Bridge, Bicycle, Pedestrian, Transportation Enhancement Activities and Public Transportation (transit) projects. Project related costs, such as Preliminary Engineering ("PE"), Right of Way ("ROW"), and Construction ("CST") are given for highways, and capital and operating costs for public transit. The projects are organized in alphabetical order by county with the same information categories listed for each of them. Projects that extend into multiple counties are shown in the STIP under each county the project enters. The project related cost and mileage for multi-county projects are given for the entire project and not per county. Projects listed in the STIP were identified through the planning process in consultation with rural local officials as per GDOT's "Consultation Process with Local Officials in Non-Metropolitan Areas of the State", and are important to the state's transportation program.
Cost estimates for individual projects are based on the best available engineering estimates. These costs may change as a project progresses from preliminary engineering to the purchase of right of way to construction. If these increased costs are the result of a change in the original scope of the project, the STIP will be amended, including the necessary public involvement. If the increased costs are based on updated engineering improvements and not a change in the actual work, no amendment to the STIP is necessary.
The STIP was developed under guidelines provided by the Transportation Equity Act for the 21st Century (TEA-21), passed by Congress in 1998. TEA-21 continues the initiatives started under the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). Projects in the STIP emphasize the maintenance, safety, and improvement of existing transportation facilities and public transportation systems.
The STIP is fiscally balanced, including only those projects with funding available or having a reasonable expectation of obtaining funds. Federal funds for fiscal years 2005,2006 and 2007 are program estimates and will not be final until after the federal budget is implemented on October 1 of each year.
Census Data indicates that the population growth rate of Georgia between April 1, 2000 and July 1, 20Q3 was 6.1%. This growth rate is nearly double the U.S. average. Georgia's economy is also growing, leading to increased demands on the transportation system. The STIP process ensures that we receive maximum benefits from available funding and that Georgia's transportation system will continue to support and promote Georgia's growth and economy.
The Department of Transportation wishes to thank all of the citizens and local officials for taking the time to provide input on the development of this program.



Georgia Department of Transportation
STATE TRANSPORTATION IMPROVEMENT PROGRAM
PUBLIC INVOLVEMENT PROCESS

Background on the State Transportation Improvement Program

Federal legislation requires that each state produce a State Transportation Improvement Program (STIP). The STIP lists federally funded projects for the next three years, and is updated and approved on an annual basis.

A major component of the STIP development process is public involvement. In the fifteen metropolitan areas of the state public involvement is the responsibility of the local metropolitan planning organizations (MPOs) in developing local Transportation Improvement Programs (TIP). The Office of Planning oversees the STIP public involvement process for the six rural GDOT Districts and distributes the STIP to the Districts for use in their public meetings and meetings with local officials.

Process
The public involvement process has evolved over time but the basic components remain the same.



Public meetings

Annual public meetings are held to provide the opportunity for public review and comment. GDOT contracts with 11 Service Delivery Regions (SDR) to assist the DOT District Offices with coordinating the STIP public involvement process and conducting the public meetings. In 2004 fifteen public meetings were held on the following dates:

May 17 - Macon (2 meetings) May 18 - Milledgeville (2 meetings) May 20 - Columbus May 24 - Dublin May 27 - Cartersville June 1 - Plains (2 meetings)

June 3 - Camilla June 3 - Gay June 8- Valdosta June 15- Gainesville June 22 - Augusta June 22 - Jesup'

The Department and the SDRs invited large numbers of customers to these meetings. The Department mailed over 5,200 individual invitations to local officials and the Family of Partners, a group of stakeholders with interest in transportation. The SDRs sent additional invitations to local officials, chambers of commerce, transportation providers, and other stakeholders.

Ads were placed in local newspapers publicly announcing STIP meetings and announcements are published in Department newsletters, (On Target) and SDR publications. An informational brochure explaining the STIP process is also published and distributed at the public meetings.



Meetings with Local Officials

Every year as part of the STIP development process, the District Planning and Programming Engineers meet with representatives from each county and city in their area to discuss projects in the STIP to solicit comments and questions. During these meetings, a range of transportation issues are discussed and requests are forwarded to the appropriate DOT office for response. Local officials sign a "Certification of Cooperation with Elected Officials" documenting STIP consultation.



STIP on web

The Department also makes the FY 2005-2007 STIP available to citizens on the Department's web page. The web address for the Georgia STIP is:

http://www.dot.state.ga.usIDOT/planprog/planning/programs/stip_ 0507 lindex.shtml An email contact is also included on this site for citizen's comments.



Comments

Comments received from the public meetings and the meetings with locals are taken into consideration in the development of the STIP and any questions asked are answered or forwarded to the appropriate office. The comments and questions received from the public meetings and the meetings with the local officials ranged from general comments such as the need for more public transit routes to project specific questions, such as when is a particular project scheduled for construction. All questions were responded to in writing.

The State Transportation Improvement Program is also available in paper format for a fee by calling the Department's Map Sales at (770)986-1436:



(((((((((((((((((((((((

((((

ReconstlRehab
$2,590,212

STIP Funds by Category for
2005 - 200 7 Total Funds $7.9 Billion

(
Transit
_ $819,138
Bridges
$1,412,651

Other
$854,522
$ in Thousands

...
New Construction
$520,959

Safety
$755,482

Enhancement
$400,721

Maintenance
$614,824



Georgia Department of Transportation STIP Financial Plan
The Georgia Statewide Transportation Improvement Program (STIP) lists highway, passenger rail and transit projects. The following describes how the STIP Financial Plan (SFP) was developed for Fiscal 2005-2007. The SFP allocates transportation funding to state and local projects for a three year time period. The financial plan includes projects for which funding can reasonably be expected to be available. Only those projects or project phase (preliminary engineering, rights-of way or construction) for highway projects or (capital or operating) for transit projects may be included in the STIP.
The Fiscal 2005-2007 SFP was developed on the basis of current state and federal fund balances and projected 2004,2006, and 2007 Federal-aid and state funding for each of the three years ofthe STIP. Also the Transportation Improvement Programs (TIP) and their related funding, developed by Georgia's fifteen Metropolitan Planning Organizations (MPO), are incorporated into the STIP by reference.
The Fiscal 2005-2007 SFP for highways and transit totals $7.87 billion with a FY 2005 annual program of$2.60 billion. Funding for this three-year program includes $4.29 billion in federal funds, $2.11 billion in state funds, $1.25 billion in State Bonds, and $0.23 billion in local funds. This level of infrastructure investment supports nearly 330,834 jobs in the construction industry as well as a well-maintained transportation system that fosters a healthy economy by providing the infrastructure for efficient movement of goods and people.
The project cost estimates used in developing the STIP are based on the best available engineering estimates at the time. Final cost for the actual projects may differ, as the projects are refined through the pre-construction process. If changes due to these modifications alter the original intent, design, or scope of the project then appropriate STIP amendment procedure will be followed.
HIGHWAY PROGRAMS -funded by the continuation Title 1 ofTEA 21 (Transportation Equity Actfor the 'Zl" Century)
Interstate Maintenance (1M) - Funds used for resurfacing, restoration, and rehabilitation of the Interstate Highway System. These funds cannot be used to provide new capacity to the system, nor for construction of new facilities such as rest areas, ports of entry, etc.
National Highway System (NHS) - The system of national highways approved by Congress and considered most important to interstate travel, national defense, connectivity with other modes of transportation, and for international commerce. The system includes the current Interstate highways and other key state routes identified by the State.
Surface Transportation Program (STP)- STP funds may be used for a range ofprojects from new construction to resurfacing, and may be flexed to transit. STP funds are distributed according to federal guidelines and in compliance with State legislation.
Fifty percent of STP funds are for urban and rural areas of the state based on population. Thirty percent can be used in any area ofthe state at the direction of the State Transportation Board. Of the remaining twenty percent, ten percent is for highway safety projects and ten percent is used for

Transportation Enhancement Activity projects. Safety projects include Hazard Elimination, Railroad Crossing, and Railroad Protective Devices.

The Transportation Enhancement Program is very popular, especially with users of non-traditional transportation. The State Transportation Board established the Transportation Enhancements Advisory Panel to assist in project selection and to represent statewide interests with expertise in multi-modal facilities, historic resources, transportation aesthetics, scenic preservation and other TEA-type activities.

There are twelve categories of TEA projects.

These include" ...provisions offacilities for pedestrians and bicycles; provision ofsafety and

educational activities for pedestrians and bicyclists; acquisition ofscenic easements...or historic

sites; scenic or historic highway programs (including the provision oftourist and welcome center

facilities), landscaping and other scenic beautification; historic preservation, rehabilitation and

operation ofhistoric transportation buildings, structures, or facilities (including railroadfacilities);

preservation ofabandoned railway corridors (including the conversion and use thereoffor

pedestrian or bicycle trails); control and removal ofoutdoor advertising; archaeological planning

and research; and environmental mitigation to address water pollution due to highway runoff, or

oriefdtruacnesvpeohritcaltei.o-cnamusuesdeuwmilsd. l"ifSeoumrceo: rNtaatliiotnyal

(while, maintaining habitat connectivity);
Transportation Enhancement Clearinghouse,

and,

establishment

Legislation limits eligible recipients to public agencies. However, private groups are encouraged to participate by applying through an appropriate public agency (County and/or City). TEA program funds require a 20% match provided by the recipient.

Congestion Management/Air Quality (CMAQ) - These funds are for projects, which can be proven to reduce traffic congestion and/or improve air quality in non-attainment areas. Projects such as park and ride lots, signal coordination, and ride sharing qualify for these funds. Currently, there are thirteen counties in the non-attainment area: Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Paulding, and Rockdale.

Bridge Replacement (BR) - These funds are for the replacement or rehabilitation of substandard bridges both on and off the federal system. Bridges must have a span of20 feet and must be listed on the Federal Register with a sufficiency rating of 80 or less for rehabilitation and 50 or less for replacement.

Demonstration or High Priority (Demo, HPP) - These funds are congressionally authorized and designated for specified projects.

IHIGHWAY FUNDING SOURCESI

State Funding Sources - The $3.31billion in State highway funds are available from several sources including motor fuel taxes, special fuel taxes (diesel), State Bonds and 3% state sales tax on gasoline. Ninety-seven percent of these funds are used for construction and maintenance of highways. The remaining three percent are programmed for improvements to local roads. Revenues from these sources increase about one percent a year. State funds are part of the STIP program development, with $807 million used for federal match.

2





Federal Highway Funding Sources - Federal highway funds in the STIP are estimated based on the Department's expectations of what Congress will authorize to be spent on the program. The Department expects $3.796 billion in federal highway funds over the next three years, from the Highway Trust and Other Funds and $1.103 billion from carryover funding from the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 and from Transportation Equity Act for the 21stCentury (TEA-21). Georgia's yearly share from the Highway Trust Fund is anticipated to be about 3.50% of the estimated $32.7 billion or $1.133 billion in FY 2005. The obligation ceiling, or the minimum amount of funds that Georgia will receive, is 90.5% of that amount. Estimates are subject to change based on forthcoming yearly appropriation and obligation levels set by Congress.
Local Highway Funding Sources - During the three-year program, an estimated $101 million in local funds will be needed to match federal-aid for local highway projects and for local contributions to matching improvements on the state highway system.
IFY 2005-2007 FUNDING OF HIGHWAY PROJECTSI
The $7.34 billion highway program for FY 2005-2007 includes $3.9 billion in federal-aid, $3.31 billion in state funds and $0.116 billion in local funds. The following table summarizes program funding for FY 2005-2007:

FY 2005-2007 Highway Projects ($ Millions)

Fund Source
Federal Aid State Funds Local Funds Bond Funds Total

FY 2005 FY 2006 FY 2007

$1,446 $527 $54 $327
$2,354

$1,241 $769 $33 $496
$2,539

$1,232 $763 $29 $427
$2,451

Total FY 2005-2007
$3,919 $2,059
$116 $1,250 $7,344

Average Annual FY 2005-2007
$1,306 $686 $39 $417
$2,448

Selected Program Distribution Sidewalks Bicycle/Pedestrian Transfer to Transit HOV ITS Design

$11.5 $48.3 $68.2
$40 $58.9 $213.3

$4.3 $21.3
$5.7 $51.6 $146.5 $99.2

$6.3 $5.5 $47 $42 $115.7 $101.4

$22.1 $75.1 $120.9 $133.6 $321.1 $413.9

$7.37 $25
$40.3 $44.5 $107 $138

Local Road Assistance Federal-aid to local governments is primarily from the Surface Transportation Program and the Bridge Replacement and Rehabilitation Program. Local governments also receive federal demonstration funds for specific projects and Congestion Mitigation/Air Quality funds based on project eligibility and selection. Enhancement projects are selected statewide based on the guidance provided through the Georgia Transportation Enhancement Program.
3

Total Estimated Highway Estimated Funds and Obligation Limitation FY 2005
($ Millions)

Categor~ Groupings Federal Funds Required Matching Funds

Interstate Maintenance Bridge Placement & Rehabilitation National Highway System
Congestion Mitigation Surface Transportation
Program Misc. Categories
Total Apportionment
Total Other Funds Unobligated Balance Grand Total

$177 $89
$244
$28 $377
$218 $1,133
$9 $1,103
$2,245

$18 $18
$49
$6 $75
$44 $227
$2 $221
$449

Formula Obligation Ceiling
Other Obligation Limitation
Special Limitation
Total Apportioned Funding Availability

$903
$11
$504 $1,418

$181
$2
$101 $284

Total
$195 $107
$293
$34 $452
$262 $1,360
$11 $1,324
$2,694
$1084
$13
$605 $1,702

Total Estimated Highway Funds FY 2005-2007
($ Millions)

Category (FY) Federal Aid Match State Local Total

2005 $2,521 $ 504 $350 $54 $3,429

2006 $1,178 $236 $1,029 $33 $2,486

2007 $1,200 $240 $950 $29 $2,419

Total
$4,899 $980
$2,339 $116
$8,334

4





Transportation Equity Act for the 21st Century - Title 3 programs Transit, passenger rail, aviation, freight rail and ports join highways as significant modes in Georgia's intennodal transportation system. Non-highway modes funded through Title III or through moneys flexed from Title 1 are part of the STIP. Because of its importance to the state's transportation program, a comprehensive summary of non-highway modal programs, funded with other than TEA 21 funding and administered by the Georgia Department of Transportation is included in this document.
tI'RANSIT PROGRAMSI
The Georgia Department of Transportation in cooperation with the Federal Transit Administration (FTA) and the state's public transit agencies work together to develop service programs and facility improvements to meet the state's public transportation needs.
One of the missions of GDOT's public transit program is to preserve and enhance the state's facilities and equipment in urban and rural public transit. Public transit projects listed in the STIP are funded with Federal Transit Administration funds (under TEA 21). These projects have been identified by the MPOs through the transportation planning process and become a part of the Transportation Improvement programs (TIP) in urban areas. The Department in cooperation with rural transit operators identifies rural needs. Urban transit projects are listed for cities with transit programs in operation - Albany, Athens, Atlanta, Augusta, Columbus, Gainesville, Macon, Rome and Savannah.
Typical urban transit projects include urban capital, planning, and operating (Federal Transit Section 5307) and statewide elderly/disabled capital (Federal Transit - Section 5310) projects. GDOT is the designated recipient of FTA funds for areas under 200,000 population. The Department receives financing from the State's General Fund budget to match one half of the local share of transit projects in Albany, Athens, Gainesville, Macon and Rome. In addition, the Department coordinates with the Georgia Department of Human Resources (GDHR) on elderly and handicapped transportation projects.
Atlanta, Augusta, Savannah and Columbus have populations of over 200,000 and receive transit funds directly. The Department also provides one half the local share of matching funds for capital projects in these areas. The Department has played an important role in providing financial assistance to match projects for Cobb Community Transit (CCT), the Gwinnett County Transit, the Metropolitan Atlanta Regional Transit Authority (MARTA) and Douglas County.
Transit Programs include:
Job Access and Reverse Commute Program - FTA Section 3037 provides competitive grants to local governments, nonprofit organizations, and designated recipients of Federal transit funding to develop transportation services to connect welfare recipients and low income persons to employment and support services.
Urbanized Area Formula Program - FTA Section 5307 provides funding for capital, operating and planning assistance. Funds are distributed nationwide on a formula basis.
5

Capital Investment Program - FTA Section 5309 offers capital funding for public transportation systems on a discretionary basis. Elderly and Persons with Disabilities Formula Program - FTA Section 5310 provides funding to private non-profit agencies for capital improvements to be used in the provision of transportation service to elderly and disabled persons.
Nonurbanized Area Formula Program - FTA Section 5311 provides funding to enhance the access of people in non-urbanized areas to healthcare, shopping, education, employment, public services and recreation. Funds are available for capital, operating and administrative expenses.' Also provides capital funds for private intercity bus transportation.

tfRANSIT FUNDING SOURCESI

State Funding Sources - The State Legislature provides one-half of the required twenty percent match for federal transit funding through the General Fund. Approximately $20 million in General Funds for transit purposes are programmed in the STIP.

Federal Transit Funding Sources - The $363 million in federal transit funds is partially based on estimates of federal revenue available to Georgia through the Transit Trust Fund and from earmarked funds in the Transportation Efficiency Act for the 21st Century (TEA-21).

Local Transit Funding Sources - During the three-year program, an estimated $137 million in local funds will be needed to match federal transit funds. These funds are acquired through local sales taxes, special taxing districts, property taxes as well as the general tax digest.

FY 2005-2007 Transit Projects ($ Thousands)

Fund Source Federal Funds

FY 2005 130,334

FY 2006 FY 2007 $118,100 $114,100

Total FY Annual Average

2005-2007

$362,534

$120,844

State Funds Local Funds Total

$6,450 $48,395 $185,179

$6,914 $44,115 $169,129

$6,401 $44,416 $164,917

$19,765 $136,926 $519,225

$6,588 $45,642 $173,075

6



.'

Estimated Transit Funds FY 2005 ($ Thousands)

Category
Job Access and Reverse Commute* Urbanized Area Formula Program Capital* Urbanized Area Formula ProgramOperating* Urbanized Area Formula ProgramCapital MARTA Capital Investment Program* Capital Investment Program-MARTA Urbanized Area Formula ProgramCapital Atlanta Area- NonMARTA Nonurbanized Area Formula ProgramOperating - Atlanta Area Nonurbanized Area Formula ProgramCapital - Atlanta Area Elderly & Persons with Disabilities Program - Atlanta Area Elderly & Persons with Disabilities Program Statewide Nonurbanized Area Formula Program-

Federal Funds
$3,209

Required State Required Local

Matching Funds Matching

Funds

$0

$3,209

$7,427

$928

$928

$5,133

$0

$16,037

$36,865

$0

$9,216

$23,067 $24,865 $16,505

$1,692 $2,100
$685

$4,075 $4,116 $3,441

$375 $293 $627 $1,268 $4,273

$0 $37 $157 $317 $534 7

$375 $37 $0 $0 $534

Total $6,418 $9,283 $21,170 $46,081 $28,834 $31,081 $20,631
$750
$367
$784
$1,584
$5,341

Capital Nonurbanized Area Formula ProgramOperating Other
Total Apportionment

$6,427
$0 $130,334

*excludes MARTA

$0
$0 $6,450

$6,427
$0 $48,395

$12,854
$0 $185,179

\AVIATION PROGRAMSI
The mission of GDOT's aviation program is to preserve and enhance the State's air transportation system to meet the demands of users. The program provides financial and technical support to publicly owned, open to the public airports. The Georgia Department of Transportation is authorized to plan and support the establishment, development and maintenance of aviation and aviation facilities. The Georgia Airport Aid Program (GAAP) provides state funding assistance, appropriated by the Georgia General Assembly, for capital, maintenance, approach aid and planning projects. Development, Maintenance, Approach Aid, and Planning projects are funded at 75% state assistance or 50% state assistance for urban area airports lacking federal support. All FAA (Federal Aviation Administration) supported construction projects may be funded at 95% FAA and 2.5% state aid. Airport markings on State development projects are eligible for 100% funding. In addition, the minimum contract level of state funding assistance on all GAAP projects is $1,500. State projects (non-federal) are selected annually based on the GAAP Priority System criteria. Federally funded projects have the highest priority for matching state funds.

!RAIL PROGRAMSI
The mission of GDOT's rail program is to preserve and enhance the State's rail transportation system for the future development of rail freight and rail passenger service. Existing rail corridors identified in the "Freight Rail Plan" are acquired and rehabilitated to assure strategic rail freight access to Georgia communities. Since 1992, GDOT has acquired 497 miles of rail lines in Georgia, all of which is considered light density line track; and since 1981, GDOT has rehabilitated 764 miles of light density line track.
The passenger rail program, defined in the "Intermodal Program for Rail Passenger Service in Georgia" guides implementation of both intrastate, intercity, and commuter rail service to provide a multi-modal alternative in the State's largest travel markets. Seven commuter services and the six intercity lines have been identified to serve the Atlanta, Athens, Gainesville, Bremen, Canton, Senoia, Griffin, Macon, Albany, Savannah, Augusta, and Columbus markets.

WORT PROGRAMSI
The mission of GDOT's ports program is to preserve and enhance waterway transportation. In order to maintain a navigable channel, the Corps of Engineers dredges the Savannah River annually. The Department's role is to provide and maintain dredge material containment areas for the Corp's work
8





on the Savannah Harbor and the Atlanta Intracoastal Waterway. The Department is required to fund dike design, construction, maintenance, environment mitigation and operations. Beginning in FY06, GDOT will fund 35% of dike construction costs and no maintenance costs of disposal areas. GDOT annually requests funding from the Georgia General Assembly to cover the costs of these activities. There are no matching federal or local funds for these programs.
State Transportation Improvement Program (STIP) and Transportation Improvement Program (TIP) Amendment Process
The STIP/TIP amendment process described below details procedures that are to be used to update an existing approved STIP or TIP. A key element of the amendment process is to assure that funding balances are maintained.
TIP (Transportation Improvement Program) Administrative Changes The following actions are eligible as Administrative Changes to the TIP: Obvious minor data entry errors.
Splitting or combining projects. Minor change in expenditures for transit projects
Changes or clarifying elements of a project description (with no change in funding). This would . generally be less than 10% change in project termini. This change would not alter the original project intent.
Increase funding less than 20% for a Lump sum category
The Administrative Change process consists of a letter of notification from the MPO (Metropolitan Planning Organization) to all other involved parties: GDOT, FTA and FHWA. No public involvement is required for Administrative Changes.
TIP (Transportation Improvement Program) Minor Amendments (not controversial)* A Minor Amendment to the TIP would include adding or deleting a phase for one of the following project types:
Bike/pedestrian projects o TEA projects Transit enhancements Transportation studies using capital funds (also needs to be in SPR Work Program) Tum lane, intersection improvements and signal projects Signage, lighting, landscaping or green way projects Recreational Trails projects Minor ITS/ATMS projects
*A controversial project is defined on a case by case basis through the MPO planning process.
Consideration will be given to the amount of money involved, scope, geographic location and impacts in evaluating if a project may be controversial.
A Minor Amendment to the TIP would include making any of the following changes: Shifting projects within the TIP Move PE, ROW or Construction Funds programmed for previous year into a new TIP
9

Shifting Construction funds to add a PE or ROW phase to a project The deletion of a project at the request of the Project Sponsor Increase funding more than 20% for a Lump sum category (maintenance, safety, PE, hazard
elimination, RIR crossing etc.)
The Minor Amendment process for areas with over 500,000 population requires advertising of the amendment in a legal organ, allowing a IS-day comment period and responding to any comments received. Following public notice, approval action may be taken through the TIP approval process.
For areas with less than 500,000 in population, the amendment would 'be put on the agenda for discussion at the CAC, TCC and PC meetings and any comments received prior to or at the meetings would be responded to.
The MPO is responsible for giving notification to GDOT and FHWAlFTA of the action taken and providing assurance that the minor amendment process and the public involvement procedure have been followed.
TIP (Transportation Improvement Program) Major Amendments Major Amendments to the TIP would include the following.
Change in scope that alters the original intent ofthe project Increase or decrease in the scope of a proj ect by more than 10%. AddlDelete a phase of a project not identified in the minor amendment section: i.e.
capacity increases, regionally significant projects, major ATMS projects, controversial projects of any type.
The Major Amendment process for areas with greater than 500,000 in population requires widespread advertisement, a 30 day public comment period, and response to all comments received, either via individual or sumniary form. There is no requirement for a public hearing, however, the MPO may choose to hold a hearing. The Major Amendment project is put on the agenda for discussion and action through the TIP approval process. The Major Amendment process for areas with less than 500,000 in population requires public advertisement, a IS-day comment period, and response to all comments, either individually or in a summary form. There is no requirement for a public hearing. The Major Amendment follows the usual CAC, TCe and PC process for action.
The MPO is responsible for notification to GDOT and FHWA/FTA of action taken and assuring that the Major Amendment process and public involvement procedures have been followed.
STIP (Statewide Transportation Improvement Program) Administrative Changes The following actions are eligible as Administrative Changes to the STIP:
Project number change or Project identification number change. Splitting or combining projects. Increase in Lump Sums by less than 20%. Fund source change. Obvious minor data entry errors. Minor change in expenditures for transit projects Changes or clarifying elements of a project description (with no change in funding). This
would generally be less than 10% change in project termini. This change would not alter the original project intent.
10



. I.'

The STIP Administrative Change process consists of notification to all involved parties in the latest version ofthe Department's Construction Work Program. There is no public involvement required in such instances. If an administrative change is made at the time of submittal of a project for authorization, that form will serve as such notice.
STIP (Statewide Transportation Improvement Program) Minor Amendments A Minor Amendment to the STIP would include the following.
Shifting projects within the STIP. Move PE, ROW or Construction Funds programmed to another year of the STIP The deletion of a project at the request ofthe Project Sponsor. Increase in Lump Sums project amounts by more than 20%. Shifting Construction funds to add a PE or ROW phase to a project Addition or deletion of a phase of a project shown on the TIP Minor Amendment list Increase funding more than 20% for a Lump sum category (maintenance, safety, PE,
hazard elimination, R1R crossing etc.)



Written notification is submitted to the FHWA and FTA showing the change made and stating the source of funding assuring that the financial balance of the STIP is maintained. Cost changes made to the second and third years of the STIP will be balanced during the STIP yearly update process. Minor and Major amendments to the STIP are denoted as addendum's and consecutively numbered.
STIP (Statewide Transportation Improvement Program) Major Amendments Major amendments to the STIP would include the following:
Addition of an annual TIP. Addition or deletion of a phase of a project on the TIP Major list. Major change to scope of work of an existing project. A major change would be any
change that alters the original project intent i.e. a change in the number of through lanes,
a change in termini of more than 1 percent, or a change in location.
The Department handles the public advertisement, a IS-day comment period, and responds to all comments, either individually or in summary form. For a STIP amendment that is solely inclusion of an approved TIP or approved amended TIP, such public involvement is not necessary as this requirement was fulfilled by the MPO prior to State approval.
An amendment will be submitted to FHWA and FTA requesting approval of the addition or change made and stating the source of funding to maintain a balanced STIP. Cost changes made to the second and third year of the STIP will be balanced during the STIP yearly update process. The Department assures that the Major Amendment process and the public involvement procedure had been followed.
Notes: 1) An amendment to the STIP or TIP is not necessary for adding individual projects from Lump sum categories as long as they are consistent with the category definitions. 2) The date at which a TIP becomes effective is when the Governor or his designee approves it. 3) The date at which a STIP becomes effective is when FHWA and FTA approve it. 4) The STIP is developed on the state fiscal year which is July I-June 30. 5) For cost increases> 50% for a project with the STIP cost under $1,000,000 and for cost increases > 20% or $1 million (whichever is greater) for projects costing over $1,000,000 will be handled as
11



an minor amendment. Notification will be sent to the project sponsor and the MPO as appropriate



when a project is shifted within the STIP as a result of these amendments.



1 2 .



LUMP SUM FUNDING
A portion of the STIP funding is set aside for eight groups of projects that do not affect the capacity of the roadway. Funds are set up in lump sum categories to undertake projects that are developed after the STIP is approved. These lump sums are listed in a number of funding types for each year for the Department's convenience in managing and accounting for the funding. Funds are drawn from these lump sums during the year and individual projects are programmed. The individual projects may include work at one or several locations for letting and accounting purposes. Listed below are these eight groups and information about them. Except for groups for preliminary engineering and rights of way protective buying, the total available funds are shown as construction for easy accounting but preliminary engineering and rights-of-way may be drawn from this amount when needed in that category.
Group: maintenance
Criteria: existing system maintenance only
This group has six funding/work types: two are for bridge painting/maintenance and the other four are for roadway maintenance. Major types of work undertaken are: resurfacing, pavement rehabilitation, median work, impact attentuators, signing, fencing, pavement markings, landscaping, rest areas, walls, guardrail and shoulder work. Also included is preliminary engineering necessary to prepare plans and rights-of-way needed for work such as landslide repair, sewer hookups and erosion control.
Group: safety
Criteria: work qualifying for the High Hazard Safety Program and other safety projects
This group includes the following work types: signal installation/upgrades, guardrail installation, sign installation, railroad protection devices, railroad crossing hazard elimination, roadway hazard elimination and special safety studies and programs.
Group: preliminary engineering
Criteria: planning, management systems and consultant design services
This group has two funding/work types: planning/management .systems and consultant design services
Group: wetland mitigation
Criteria: site restoration for projects already under construction/complete and wetland banks

This group is a single item.
Group: roadway/interchange lighting
Criteria: lighting
This group is a single item.
Group: rights of way - protective buying and hardship acquisitions
Criteria: purchase of parcel(s) of rights of way (RW) for future projects that are in jeopardy of development and for hardship acquisition. Qualifying projects are those that have preliminary engineering (PE) underway or have aPE, RW or construction phase in the STIP. For counties that are not in conformance for air quality the only qualifying projects are those that have a RW phase in the STIP. This group is a single item.
Group: transportation enhancement
Criteria: projects qualifying for the Transportation Enhancement program (TEA)
TEA projects shown in the STIP will be funded on a first come first served basis. When a project is funded it is drawn down from the lump sum. When all funds are gone, no other projects can be funded until the next fiscal year, which begins on July 1.
This group is a single item.
Group: livable centers initiative (LeI)
Criteria: projects qualifying for the LCI program and selected by the Atlanta Regional Commission (ARC)
LCI implementation projects are selected on a competitive basis and lump sum funding amounts are programmed according to reasonable schedules for engineering, right of way acquisitions and construction for projects comprising the overall program. Funding for individual phases of a project may be shifted between fiscal years as necessary if such shifts do not affect the implementation schedule of other projects or exceed the overall lump sum funding amount.
This group is a single item.



.'

Group: Appalachia Local Access Road Program
Criteria: projects qualifying for the Appalachian Regional Commission (ARC) Local Access Road Program
The ARC may approve local access road projects, which serve industrial and commercial areas, residential developments, recreational areas, and educational areas. Local access road funds may be used for preliminary engineering, right-of-way and/or construction. ARC funds are available for the initial construction of local access road projects
This group is a single item.

State of Georgia County Boundaries
'-'
~
''-'
~
'-
CoIqulli
'-' '-'
'-' ''-
'-'
''''-
'-
~ ~
'-



Understanding STIP Entries
Typical project

NOTE: Projects that are located in multiple counties are shown in each of the counties the project is located. The funding information and mileage for these projects include the total project cost and mileage and not per county project cost or mileage.

This is the PI or Project Identification number used throughout the life ofthe project for tracking purpose.

List the different phases involved in a particular project. Project can consist of Preliminary Engineering, Right ofway and/or Construction.

~""

~u '.,"

iJ1EN HIL COUNTY ... '..... ~ _.'. I

'PROJECT: 432155
itJ'SSCRP'l+SR 904@t rr:

DRAFTSTATE TRANSPORTATIO IMPROVEMENT PROGRAM

TYPE WORK REPLACEBRIDGE

Phase Fund

HOUSE CREE, K 7.1:NrIN O' ,F'FITZ'.~' ERALD:RPOEW

The status ofwhen work is scheduled to begin. Right of Way to be purchased in fiscal year 2006.
State" Other

Type ofwork, replacement ofan existing bridge. See Glossary of Terms for further definitions.
Project description: State Route 90 at Little House Creek approximately 7.1 miles north ofFitzgerald. Passing lane projects may only indicate milepost numbers.

Funding type: fourth item on top line. May be Bridge, STP, NHS, etc. & refers to specific type of federal funds to be used.

Total cost of funding for each phase of work. Right of Way cost is $20,000.

Identify government participation in funding each phase ofproject. Federal government will pay $16,000 ofright-of-way cost and state government will pay $4,000.



County Appling Atkinson Bacon Baker Baldwin Banks Barrow Bartow Ben Hill Berrien Bibb Bleckley Brantley Brooks Bryan Bulloch Burke Butts Calhoun Camden Candler Carroll Catoosa Charlton Chatham Chattahoochee Chattooga Cherokee Clarke Clay Clayton Clinch Cobb Coffee Colquitt Columbia Cook Coweta Crawford Crisp Dade Dawson Decatur Deka1b Dodge Dooly Dougherty

Page 27 28 29 30 31 33 34 35 38 39 40 45 46 47 48 49 50 51 53 54 55 56 57 59 60 66 67 68 72 75 76 81 82 91 92 93 96 97 100 101 102 103 104 105 117 118 119

County Douglas Early Echols Effingham Elbert Emanuel Evans Fannin Fayette Floyd Forsyth Franklin Fulton Gilmer Glascock Glynn Gordon Grady Greene Gwinnett Habersham Hall Hancock Haralson Harris Hart Heard Henry Houston Irwin Jackson Jasper Jeff Davis Jefferson Jenkins Johnson Jones Lamar Lanier Laurens Lee Liberty Lincoln Long Lowndes Lumpkin Macon

Page 122 126 127 128 129 130 131 132 133 136 139 142 143 168 169 170 173 175 176 177 183 184 187 188 189 191 192 193 199 200 201 203 204 205 206 207 208 209 210 211 213 214 215 216 217 219 220



\
CounO' Madison Marion McDuffie Mcintosh Meriwether Miller Mitchell Monroe Montgomery Morgan Murray Muscogee Newton Oconee Oglethorpe Paulding Peach Pickens Pierce Pike Polk Pulaski Putnam Quitman Rabun Randolph Richmond. Rockdale Schley Screven Seminole Spalding Stephens Stewart Sumter Talbot Taliaferro Tattnall Taylor Telfair Terrell Thomas Tift Toombs Towns Treutlen Troup Turner

Page
221 222 223 224 225 226 227 228 229 230 231 232 235 237 238 239 241 242 243 244 245 246 247 248 249 250 251 254 257 258 259 260 263 264 265 267 268 269 270 271 272 273 274 275 276 277 278 280

County Twiggs Union Upson Walker Walton Ware Warren Washington Wayne Webster Wheeler White Whitfield Wilcox Wilkes Wilkinson Worth

Page
281 282 283 284 286 288 289 290 292 293 294 295 296 297 298 299 300



,
\

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM za/ZOO5

All

Project: 0000536 Type Work: Impact Altentuators

Descp: IMPACT ATIENUATORS INSTALLATION AT 8 LOCS

IN DIST 1, 3, 6 &7

Length: 0.00

LUMP SUM PROJECT

TIP#: LUMP

Project: 0000694 Type Work: Miscellaneous Improvement Descp: OPERATE STATE AGENCY WIDE COMMERCIAL
VEHICLE PERMIT SYSTEM Length: 0.00
TIP#:

Project: 0001439 Type Work: Miscellaneous Improvement

Descp: TASK ORDER CONTRACT-CONSTRUCTION

MANAGEMENT - 2005

Length: 0.00

TIP#: AR-IIOA

Project: 0001484 Type Work: Bicycle/Ped. Facility Descp: LUMP SUM RECREATIONAL TRAILS & SCENIC
BYWY PROGRAMS FY 2005 Length: 0.00
TIP#:

Project: 0001485 Type Work: Bicycle/Ped. Facility Descp: LUMP SUM RECREATIONAL TRAILS & SCENIC
BYWY PROGRAMS FY 2006 Length: 0.00
TIP#:

Project: 0001492 Type Work: Minor Widen & Resurf

Descp: LUMP SUM NATIONAL PARK SERVICE

EMERGENCY FY 2005

Length: 0.00

TlP#:

Project: 0001494 Type Work: Resurface & Maintenance Descp: LUMP SUM NATIONAL PARK SERVICE SAFETY &
MAINTENANCE FY 2005 Length: 0.00
TlP#:

Project: 0001505 Type Work: Miscellaneous Improvement Descp: LUMP SUM FOR TRANSPORTATION
ENHANCEMENT(TEA) PROJECTS Length: 0.00
TlP#: AR 384C

Project: 0001587 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT - 2006 Length: 0.00
TlP#: 2003-H03

Project: 0001628 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT GRIP - 2005 Length: 0.00
TIP#: AR IIOC

Project: 0001629 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACTCONSTRUCTION
MANAGEMENT GRIP - 2006 Length: 0.00
TlP#:

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund CST STP

Year 2005

Phase Fund CST STP

Year 2005

Phase Fund CST Rec Trails

Year 2005

Phase Fund CST Rec Trails

Year 2006

Phase Fund CST Park

Year 2005

Phase Fund CST Park

Year 2005

Phase Fund CST STP

Year 2005

Phase Fund CST STP

Year 2006

Phase Fund CST State

Year 2005

Phase Fund CST State

Year 2006

Federal $270,000

State $30,000

Other $0

Federal $400,000

State $100,000

Other $0

Federal $8,000,000

State $2,000,000

Other $0

Federal $1,000,000

State $0

Other $250,000

Federal $1,000,000

State $250,000

Other $0

Federa/ $75,000

State $25,000

Other $0

Federal $150,000

State $50,000

Other $0

Federal $30,460,304

State $0

Other $7,615,076

Federal $10,160,000

State $2,540,000

Other $0

Federal $0

State $4,500,000

Other $0

Federal $0

State $4,500,000

Other $0

Total $300,000
Total $500,000
Total $10,000,000
Total $1,250,000
Total $1,250,000
Total $100,000
Total $200,000
Total $38,075,380
Total $12,700,000
Total $4,500,000
Total $4,500,000

Page 1 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

All
Project: 0001750 Type Work: Preliminary Engineering Descp: ENVIRONMENTAL ANAL YSIS ON FED-AID
PROJECTS BY CONSULTANT Length: 0.00
TIP#:

Project: 0001751 Type Work: Preliminary Engineering Descp: ENVIRONMENTAL ANAL YSIS ON FED-AID
PROJECTS BY CONSULTANT Length: 0.00
TJP#:

Project: 0001752 Type Work: Preliminary Engineering

Descp: ENVIRONMENTAL ANALYSIS ON GRIP PROJECTS

BY CONSULTANT

Length: 0.00

TIP#:

Project: 0001753 Type Work: Preliminary Engineering

Descp: ENVIRONMENTAL ANALYSIS ON GRIP PROJECTS

BY CONSULTANT

Length: 0.00

TIP#:

Project: 0001755 Type Work: Preliminary Engineering

Descp: ENVIRONMENTAL ANAL YSIS ON GRIP PROJECTS

BY CONSULTANT

Length: 0.00

TlP#:

Project: 0001756 Type Work: Preliminary Engineering Descp: ENVIRONMENTAL ANALYSIS ON GRIP PROJECTS
BY CONSULTANT Length: 0.00
TJP#:

Project: 0002174 Type Work: Miscellaneous Improvement Descp: DEBT SERVICE TO PAY BACK GRB & GO BONDS-
FY 2005 Length: 0.00
TlP#:

Project: 0002175 Type Work: Miscellaneous Improvement Descp: DEBT SERVICE TO PAY BACK GRB & GO BONDS-
FY 2006 Length: 0.00
TlP#:

Project: 0002176 Type Work: Miscellaneous Improvement Descp: DEBT SERVICE TO PAY BACK GRB & GO BONDS -
FY 2007 Length: 0.00
TlP#:

Project: 0002908 Type Work: ATMSIITS Descp: ATMS: ITS OPERATIONS AND SUPPORT
STATEWIDE - 2006 Length: 0.00
TIP#: AR-42SB
Project: 0002914 Type Work: ATMSIITS Descp: ATMS: HERO OPERATIONS AND SUPPORT
STATEWIDE - 2005 Length: 0.00
TlP#: AR-426A

Phase Fund

PE

STP

Phase Fund

PE

STP

Phase Fund

PE

State

Phase Fund

PE

State

Phase Fund

PE

State

Phase Fund

PE

Stale

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST NHS

Year 2005
Year 2006
Year 2007
Year 2007
Year 2005
Year 2006
Year 2005
Year 2006
Year 2007
Year 2006
Year 2005

Federal $2,000,000

State $500,000

Federal $2,000,000

State $500,000

Federal $0

State $2,500,000

Federal $0

State $2,500,000

Federal $0

State $2,500,000

Federal $0

State $2,500,000

Federal $28,000,000

State $7,000,000

Federal $28,000,000

State $7,000,000

Federal $28.000,000

State $7,000,000

Federal $4,800,000

State $1,200,000

Federal $4,800,000

State $1,200,000

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0

/
Total $2,500,000
Total $2,500,000
Total $2,500,000
Total $2,500,000
Total $2,500,000
Total $2,500,000
Total $35,000,000
Total $35,000,000
Total $35,000,000
Total $6,000,000
Total $6,000,000
Page 2 of 300





\

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

All

Project: 0002915 Type Work: ATMS/ITS

Descp: ATMS: HERO OPERATIONS AND SUPPORT

STATEWIDE - 2006

Length: 0.00

TIP#: AR-426B

Project: 0002916 Type Work: ATMS/ITS

Descp: ATMS: HERO OPERATIONS AND SUPPORT

STATEWIDE - 2007

Length: 0.00

TIP#: AR-426C

Project: 0003021 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT GRIP - 2007 Length: 0.00
TIP#:

Project: 0003103 Type Work: Preliminary Engineering Descp: PE FOR PROJECT REVIEW/ COST ESTIMATING
CONSULTANT SERVICES Length: 0.00
TIP#:

Project: 0003471 Type Work: Preliminary Engineering Descp: SUBSURFACE UTILITY ENGINEERING
CONSULTANT SERVICES - PH 3 Length: 0.00
TIP#:

Project: 0003474 Type Work: Miscellaneous Improvement

Descp: OPERATE FUEL TAX EVASION & DYED FUEL

PROGRAMS - PHASE 2

Length: 0.00

TIP#:

Project: 0003475 Type Work: Miscellaneous Improvement

Descp: OPERATE FUEL TAX EVASION & DYED FUEL

PROGRAMS - PHASE 3

Length: 0.00

TIP#:

Project: 0003476 Type Work: Miscellaneous Improvement Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT FOR GRIP - PH 1 Length: 0.00
TIP#:

Project: 0003477 Type Work: Miscellaneous Improvement

Descp: MATERIALS TESTING & LAB WORK BY

CONSULTANT - PH 2

Length: 0.00

TIP#:

Project: 0003538 Type Work: Transit Projects Descp: GRTA PURCHASE OF CLEAN FUEL BUSES FOR
EXPRESS SERVICE-PH 1 Length: 0.00
TlP#: AR-375C

Project: 0003825 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT BOND - 2004 Length: 0.00
TIP#: AR-IIOF

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST State

Phase Fund

PE

STP

Phase Fund

PE

STP

Phase Fund CST OT3

Phase Fund CST OT3

Phase Fund CST State

Phase Fund CST State

Phase Fund CST Bond

Phase Fund CST Bond

Year 2006
Year 2007
Year 2007
Year 2005
Year 2006
Year 2005
Year 2007
Year 2006
Year 2006
Year 2005
Year 2005

Federal $5,200,000

State $1,300,000

Federal $6,000,000

State $1,500,000

Federal $0

State $1,000,000

Federal $1,920,000

State $480,000

Federal $5,280,000

State $1,320,000

Federal $250,000

State $250,000

Federal $250,000

State $250,000

Federal $0

State $5,000,000

Federal $0

State $5,000,000

Federal $0

State $9,470,000

Federal $0

State $4,000,000

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0

Total $6,500,000
Total $7,500,000
Total $1,000,000
Total $2,400,000
Total $6,600,000
Total $500,000
Total $500,000
Total $5,000,000
Total $5,000,000
Total $9,470,000
Total $4,000,000

Page 3 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

All
Project: 0003826 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT BOND - 2005 Length: 0.00
TlP#:

Phase Fund CST Bond

Project: 0003827 Type Work: Miscellaneous Improvement Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT BOND - 2006 Length: 0.00
TlP#:

Phase Fund CST Bond

Project: 0003828 Type Work: Miscellaneous lrnprovernent Descp: TASK ORDER CONTRACT-CONSTRUCTION
MANAGEMENT BOND - 2007 Length: 0.00
TIP#: AR-IIOC
Project: 0003890 Type Work: Landscaping Descp: WILDFLOWER PROGRAM PHASE 2 - DISTRICT 3

Phase Fund CST Bond
Phase Fund CST STP

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 0003891 Type Work: Landscaping Descp: WILDFLOWER PROGRAM PHASE 2 - DISTRICT 4

Phase Fund CST STP

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0003892 Type Work: Landscaping Descp: WILDFLOWER PROGRAM PHASE 2 - DISTRICT 5

Phase Fund CST STP

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0003895 Type Work: Preliminary Engineering

Descp: PE FOR LANDSCAPING PROJECTS INCLUDING

GATEWAYS

Length: 0.00

LUMP SUM PROJECT

TIP#:

Phase Fund

PE

STP

Project: 0004015 Type Work: Preliminary Engineering Descp: OVERSIGHT SERVICES FOR STP/Q23 & CMAQ
FUNDED TIP PROJECTS Length: 0.00
TIP#: AR 450

Project: 0004016 Type Work: Preliminary Engineering Descp: OVERSIGHT SERVICES FOR STP/Q23 & CMAQ
FUNDED TIP PROJECTS Length: 0.00
TlP#: AR 450

Project: 0004017 Type Work: Preliminary Engineering Descp: OVERSIGHT SERVICES FOR STP/Q23 & CMAQ
FUNDED TIP PROJECTS Length: 0.00
TIP#: AR 450

Project: 0004613 Type Work: Preliminary Engineering
Descp: TRAFFIC ENGINEERING STUDIES - DISTRICT SUPPORT FY 2005 Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund PE STP

Phase Fund PE STP

Phase Fund

PE

STP

Phase Fund

PE

STP

Year 2005
Year 2006
Year 2007
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year 2005
Year 2006
Year 2007
Year LUMP

Federal $0

State $4,000,000

Federal $0

State $5,742,179

Federal $0

State $5,742,179

Federal $80,000

State $20,000

Federal $80,000

State $20,000

Federal $80,000

State $20,000

Federal $400,000

State $100,000

Federal $24,000

State $6,000

Federal $24,000

State $6,000

Federal $24,000

State $6,000

Federal $900,000

State $100,000

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0

I
Total $4,000,000
Total $5,742,179
Total $5,742,179
Total $100,000
Total $100,000
Total $100,000
Total $500,000
Total $30,000
Total $30,000
Total $30,000
Total $1,000,000
Page 4 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM
ZaJZQQ5

All

Project: 0004815 Type Work: ATMS/ITS

Descp: ATMS: ITS OPERATIONS AND SUPPORT

STATEWIDE 2005

Length: 0.00

TlP#: AR-425A

Project: 0004817 Type Work: ATMSIITS Descp: ATMS: ITS OPERATIONS AND SUPPORT
STATEWIDE - 2007 Length: 0.00
TlP#: AR-425C

Project: 0005388 Type Work: Miscellaneous Improvement Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT FOR FED-AID Length: 0.00
TIP#:

Project: 0005369 Type Work: Miscellaneous Improvement Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT FOR FED-AID Length: 0.00
TlP#:

Project: 0005370 Type Work: Miscellaneous Improvement Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT STATE FUNDED Length: 0.00
TIP#:
Project: 0005371 Type Work: Miscellaneous Improvement Descp: MATERIALS TESTING & LAB WORK BY
CONSULTANT STATE FUNDED Lenglh: 0.00
TlP#:
Project: 0005717 Type Work: Miscellaneous Improvement Descp: DOT PERSONNEL TRAINING FY07

Length: 0.00 TlP#:
Project: 0005728 Type Work: Miscellaneous Improvement Descp: DOT PERSONNEL TRAINING FY05

Lenglh: 0.00 TlP#:

Project: 0005729 Type Work: Miscellaneous Improvement Descp: DOT PERSONNEL TRAINING FY06

Length: 0.00 TlP#:

Project: 0005821 Type Work: Signing
Descp: SBR 15 CENTRAL RTE SBR 60 SBR70 NORTH CRESCENT BICYCLE SIGNS Length: 0.00

LUMP SUM PROJECT

TlP#: STP LUMP

Project: 0005935 Type Work: Special Studies Descp: VALUE ENGINEERING STUDIES FOR NHS
PROJECTS OVER 25M FY 07 Length: 0.00
TlP#:

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST STP

Phase Fund CST STP

Phase Fund CST State

Phase Fund CST State

Phase Fund PE STP

Phase Fund

PE

STP

Phase Fund PE STP

Phase Fund

PE

STP

CST STP

Phase Fund

PE

NHS

Year 2005
Year 2007
Year 2005
Year 2006
Year 2005
Year 2006
Year 2007
Year 2005
Year 2006
Year LUMP LUMP
Year 2007

Federal $3,600,000

State $900,000

Federal $4,800,000

State $1,200,000

Federal $1,600,000

State $400,000

Federal $1,600,000

State $400,000

Federal $0

State $2,000,000

Federal $0

State $2,000,000

Federal $800,000

State $200,000

Federal $800,000

State $200,000

Federal $800,000

State $200,000

Federal $31,437
$314,370

State $3,493
$34,930

Federal $800,000

State $200,000

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0 $0
Other $0

Total $4,500,000
Total $6,000,000
Total $2,000,000
Total $2,000,000
Total $2,000,000
Total $2,000,000
Total $1,000,000
Total $1,000,000
Total $1,000,000
Total $34,930 $349,300
Total $1,000,000

Page 5 of 300

STA TE TRANSPORTATION IMPROVEMENT PROGRAM 2f7I2QQ5

All
Project: 0005953 Type Work: Preliminary Engineering Descp: SOIL SURVEYS; BRIDGE FOUND.; HAZARD
STUDIES BY CONSULTANT-P3 Length: 0.00
TIP#:

Phase Fund PE STP

Project: 0006013 Type Work: Water Pollution Mitig. Oescp: 3,3BB STREAM CREDITS TO MITIGATE PI# 110465-

Phase Fund ROW STP

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 0006032 Type Work: Rights-Ol-Way Oescp: ROW ACQUISITION FOR CULTURAL RESOURCES
MITIGATION FY 06 &07 Length: 0.00
TlP#:

Phase Fund ROW STP

Project: 0006070 Type Work: Special Studies Oescp: RDC CONTRACT FOR
PLANNING/ENVIRONMENT/LOC SERVICES FY Length: 0.00
TlP#:

Phase Fund PE STP

Project: 0006120 Type Work: Miscellaneous Improvement Descp: LUMP SUM FOR TRANSPORTATION
ENHANCEMENT (TEA) PROJECTS FY 05 Length: 0.00
TlP#: AR-124A
Project: 0006121 Type Work: Miscellaneous Improvement Oescp: LUMP SUM FOR TRANSPORTATION
ENHANCEMENT (TEA) PROJECTS FY 06 Length: 0.00
TlP#: AR-124B
Project: 0006122 Type Work: Miscellaneous Improvemenl Descp: LUMP SUM FOR TRANSPORTATION
ENHANCEMENT (TEA) PROJECTS FY 07 Length: 0.00
TlP#: AR-124C
Project: 0006127 Type Work: Intersection Improvement Descp: LUMP SUM ALL SAFETY FUNDS FOR FY 2005

Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP

Length: 0.00 TlP#: AR-118A
Project: 0006128 Type Work: Intersection Improvement Descp: LUMP SUM ALL SAFETY FUNDS FOR FY 2006

Phase Fund CST STP

Length: 0.00 TlP#: AR-118B
Project: 0006129 Type Work: Intersection Improvement Oescp: LUMP SUM ALL SAFETY FUNDS FOR FY 2007

Phase Fund CST STP

Length: 0.00
TlP#: AR-118C
Project: 0006134 Type Work: Bridges Descp: LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR
FY 2005 Length: 0.00
TlP#: AR-113A

Phase Fund CST STP

Year 2006
Year LUMP
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005

Federal $4,000,000

State $1,000,000

Other $0

Federal $112,000

State $28,000

Other $0

Federal $200,000

State $50,000

Other $0

Federal $3,204,000

Slate $801,000

Other $0

Federal $36,800,000

State $0

Other $9,200,000

Federal $36,800,000

State $0

Other $9,200,000

Federal $36,800,000

Slate $0

Other $9,200,000

Federal $47,116,800

Slale $5,235,200

Other $0

Federal $49,636,800

State $5,515,200

Other $0

Federal $54,856,800

Slate $6,095,200

Other $0

Federal $4,000,000

State $1,000,000

Other $0

Total
$5,000,000
Total
$140,000
Total
$250,000
Total $4,005,000
Total
$46,000,000
Total
$46,000,000
Total
$46,000,000 Total $52,352,000
Total
$55,152,000 Total $60,952,000
Total $5,000,000
Page 601300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2a/2QQ5

All

Project: 0006135 Type Work: Bridges

Descp: LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR

FY 2006

Length: 0.00

T1P#: AR-1138

Project: 0006136 Type Work: Bridges

Descp: LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR

FY 2007

Length: 0.00

TIP#: AR-113C

Project: 0006141 Type Work: Preliminary Engineering Descp: LUMP SUM FEDERAL PE FOR CONSULTANT
SERVICES FOR FY 2005 Length: 0.00
TIP#: AR-I09A

Project: 0006142 Type Work: Preliminary Engineering Descp: LUMP SUM FEDERAL PE FOR CONSULTANT
SERVICES FOR FY 2006 Length: 0.00
TIP#: AR-I098

Project: 0006143 Type Work: Preliminary Engineering Descp: LUMP SUM FEDERAL PE FOR CONSULTANT
SERVICES FOR FY 2007 Length: 0.00
T1P#: AR-I09C

Project: 0006146 Type Work: Resurface & Maintenance

Descp: LUMP SUM FOR INTERSTATE MAINTENANCE FOR

FY 2005

Length: 0.00

T1P#: AR-126A

Project: 0006149 Type Work: Resurface & Maintenance

Descp: LUMP SUM FOR INTERSTATE MAINTENANCE FOR

FY 2006

Length: 0.00

TIP#: AR-1268

Project: 0006150 Type Work: Resurface & Maintenance

Descp: LUMP SUM FOR INTERSTATE MAINTENANCE FOR

FY 2007

Length: 0.00

(\

TIP#: AR-126C

Project: 0006155 i Type Work: Miscellaneous Improvement

Descp: UMP SUM FY05 PROJECT ADJUSTMENTS: PR2A

AND FINAL',vOUCHERS Length: 0.00

TIP#:

Projec : 0006156 Type Work: Miscellaneous Improvement Descp: LUMP SUM FY06 PROJECT ADJUSTMENTS: PR2A
AND FINAL VOUCHERS Length: 0.00

1
Project: 10006157,1 Type Work:

TIP#: Miscellaneous Improvement

Descp: LUMP SYM FY07 PROJECT ADJUSTMENTS: PR2A

. J A~D FINAL VOUCHERS

Length: 0.00

TlP#:

Phase Fund CST STP

Phase Fund CST STP

Phase Fund

PE

STP

Phase Fund

PE

STP

Phase Fund

PE

STP

Phase Fund CST 1M

Phase Fund CST 1M

Phase Fund CST 1M

Phase PE ROW CST

Fund STP STP STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005 2005 2005 Year 2006 2006 2006 Year 2007 2007 2007

Federal $4,000,000

State $1,000,000

Federal $6,000,000

State $1,500,000

Federal $12,000,000

State $3,000,000

Federal $4,000,000

State $1,000,000

Federal $4,000,000

State $1,000,000

Federal $18,000,000

State $2,000,000

Federal $22,500,000

State $2,500,000

Federal $18,000,000

State $2,000,000

Federal $40,000,000 $28,000,000 $76,000,000

State $10,000,000
$7,000.000 $19,000,000

Federal $40,000,000 $28,000,000 $76,000,000

State $10,000,000
$7,000,000 $19,000,000

Federal $40,000,000 $28,000,000 $76,000,000

State $10,000,000
$7,000,000 $19,000,000

Other $0

Total $5,000,000

Other $0

Total $7,500,000

Other $0

Total $15,000,000

Other $0

Total $5,000,000

Other $0

Total $5.000,000

Other $0

Total $20,000,000

Other $0

Total $25,000,000

Other $0

Total $20,000,000

Other $0 $0 $0

Total $50,000,000 $35,000,000 $95,000,000

Other $0 $0 $0

Total $50,000,000 $35,000,000 $95,000,000

Other $0 $0 $0

Total $50,000,000 $35,000,000 $95,000.000

Page 7 01300

STATE TRANSPORTATION IMPROVEMENT PROGRAM WI2005

All

Project: 0006162 Type Work: Lighting

Descp: LUMP SUM INTERCHANGE/ROADWAY LIGHTING

FOR FY 2005

Length: 0.00

TlP#: AR-12IA

Project: 0006163 Type Work: Lighting

Descp: LUMP SUM INTERCHANGE/ROADWAY LIGHTING

FOR FY 2006

Length: 0.00

TlP#: AR-IZI8

Project: 0006164 Type Work: Lighting

Descp: LUMP SUM INTERCHANGEIROADWAY LIGHTING

FOR FY 2007

Length: 0.00

TIP#: AR-IZIC

Project: 0006169 Type Work: Bridges Oescp: LUMP SUM INTERSTATE BRIDGE
PAINTING/MAINTENANCE FOR FY 2005 Length: 0.00
TlP#: AR-114A

Project: 0006170 Type Work: Bridges Oescp: LUMP SUM INTERSTATE BRIDGE
PAINTING/MAINTENANCE FOR FY 2006 Length: 0.00
TlP#: AR-1148

Project: 0006171 Type Work: Bridges Oescp: LUMP SUM INTERSTATE BRIDGE
PAINTING/MAINTENANCE FOR FY 2007 Length: 0.00
TlP#: AR-114C

Project: 0006176 Type Work: Pavement Rehab Oescp: LUMP SUM MAINTENANCE FOR ANY AREA FY
2005 Length: 0.00
TlP#: AR-IZ5A

Project: 0006177 Type Work: Pavement Rehab Oescp: LUMP SUM MAINTENANCE FOR ANY AREA FY
2006 Length: 0.00
TlP#: AR-IZ58

Project: 0006178 Type Work: Pavement Rehab Descp: LUMP SUM MAINTENANCE FOR ANY AREA FY
2007 Length: 0.00
TlP#: AR-IZ5C

Project: 0006183 Type Work: Pavement Rehab Oescp: LUMP SUM MAINTENANCE FOR ANY AREA GT
200K FY 2005 Length: 0.00
TlP#:

Project: 0008184 Type Work: Pavement Rehab Descp: LUMP SUM MAINTENANCE FOR ANY AREA GT
200K FY 2006 Length: 0.00
TlP#:

Phase Fund CST NHS

Year 2005

Federal $800,000

State $200,000

Phase Fund CST NHS

Year 2006

Federal $800,000

State $200,000

Phase Fund CST NHS

Year 2007

Federal $800,000

State $200,000

Phase Fund CST 1M

Year 2005

Federal $9,000,000

State $1,000,000

Phase Fund CST 1M

Year 2006

Federal $9,000,000

State $1,000,000

Phase Fund CST 1M

Year 2007

Federal $9,000,000

State $1,000,000

Phase Fund CST STP

Year 2005

Federal

State

$49,688,000 $12,422,000

Phase Fund CST STP

Year 2006

Federal

State

$49,688,000 $12,422,000

Phase Fund CST STP

Year 2007

Federal

State

$49,688,000 $12,422,000

Phase Fund CST STP

Year 2005

Federal $6,000,000

State $1,500,000

Phase Fund CST STP

Year 2006

Federal $6,000,000

State $1,500,000

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0

Total
$1,000,000
Total
$1,000,000
Total
$1,000,000
Total $10,000,000
Total
$10,000,000
Total
$10,000,000
Total
$62,110,000 Total $62,110,000 Total $62,110,000 Total
$7,500,000
Total
$7,500,000
Page 8of300



STATE TRANSPORTATION IMPROVEMENT PROGRAM zaJ2QQ5

All

Project: 0006185 Type Work: Pavement Rehab

Descp: LUMP SUM MAINTENANCE FOR ANY AREA GT

200K FY 2007

Length: 0.00

TIP#:

Project: 0006190 Type Work: Pavement Rehab Descp: LUMP SUM MAINTENANCE ON NATIONAL
HIGHWAY SYSTEM FOR FY 2005 Length: 0.00
TlP#: AR-IIIA

Project: 0006191 Type Work: Resurface & Maintenance Descp: LUMP SUM MAINTENANCE ON NATIONAL
HIGHWAY SYSTEM FOR FY 2006 Length: 0.00
TlP#: AR-IIIB

Project: 0006192 Type Work: Resurface & Maintenance Descp: LUMP SUM MAINTENANCE ON NATIONAL
HIGHWAY SYSTEM FOR FY 2007 Length: 0.00
TlP#: AR-IIIC

Project: 0006197 Type Work: Railroad Crossing

Descp: LUMP SUM RAILROAD CROSSING HAZARD

ELIMINATION FY 2005

Length: 0.00

TIP#: AR-117A

Project: 0006198 Type Work: Railroad Crossing

Descp: LUMP SUM RAILROAD CROSSING HAZARD

ELIMINATION FY 2006

Length: 0.00

TIP#: AR-117B

Project: 0006199 Type Work: Railroad Crossing

Descp: LUMP SUM RAILROAD CROSSING HAZARD

ELIMINATION FY 2007

Length: 0.00

TIP#: AR-117C

Project: 0006204 Type Work: Rights-Ot-Way

Descp: LUMP SUM RIGHTS OF WAY PROTECTIVE

BUYING FOR FY 2005

Length: 0.00

TIP#: AR-119A

Project: 0006205 Type Work: Rights-Ot-Way Descp: LUMP SUM RIGHTS OF WAY PROTECTIVE
BUYING FOR FY 2006 Length: 0.00
TlP#: AR-119B

Project: 0006206 Type Work: Rights-Ot-Way Descp: LUMP SUM RIGHTS OF WAY PROTECTIVE
BUYING FOR FY 2007 Length: 0.00
TlP#: AR-119C

Project: 0006211 Type Work: Railroad Crossing

Descp: LUMP SUM RRX PROTECTION DEVICE FOR FY

2005

Length: 0.00

TIP#: AR-122A

Phase Fund CST STP
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST NHS
Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST STP
Phase Fund ROW STP
Phase Fund ROW STP
Phase Fund ROW STP
Phase Fund CST STP

Year 2007
Year 2005
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005
Year 2006
Year 2007
Year 2005

Federal $6,000,000

State $1,500,000

Federal $2,000,000

State $500,000

Federal $32,000,000

State $8,000,000

Federal $800,000

State $200,000

Federal $3,100,000

State $0

Federal $3,100,000

State $0

Federal $3,100,000

State $0

Federal $2,000,000

State $500,000

Federal $2,000,000

State $500,000

Federal $2,000,000

State $500,000

Federal $3,100,000

State $0

Other $0

Total $7,500,000

Other $0

Total $2,500,000

Other $0

Total $40,000,000

Other $0

Total $1,000,000

Other $0

Total $3,100,000

Other $0

Total $3,100,000

Other $0

Total $3,100,000

Other $0

Total $2,500,000

Other $0

Total $2,500,000

Other $0

Total $2,500,000

Other $0

Total $3,100,000

Page 9 at 300

STA TE TRANSPORTATION IMPROVEMENT PROGRAM za12QQ5

All

Project: 0006212 Type Work: Railroad Crossing

Descp: LUMP SUM RRX PROTECTION DEVICE FOR FY

2006

Length: 0.00

TlP#: AR-122B

Project: 0006213 Type Work: Railroad Crossing

Descp: LUMP SUM RRX PROTECTION DEVICE FOR FY

2007

Length: 0.00

TlP#: AR-122C

Project: 0006218 Type Work: Signals Descp: LUMP SUM SIGNAL INSTALL;UPGRADES &
MAINTENANCE ANY AREA FY05 Length: 0.00
TlP#: AR-123A

Project: 0006219 Type Work: Signals Descp: LUMP SUM SIGNAL INSTALL;UPGRADES &
MAINTENANCE ANY AREA FY06 Length: 0.00
TIP#: AR-123B

Project: 0006220 Type Work: Signals Descp: LUMP SUM SIGNAL INSTALL;UPGRADES &
MAINTENANCE ANY AREA FY07 Length: 0.00
TIP#: AR-123C

Project: 0006225 Type Work: Special Studies Descp: LUMP SUM TRANSPORTATION PLANNING &
MANAGEMENT SYSTEMS-2005 Length: 0.00
TIP#: AR-115A

Project: 0006226 Type Work: Special Studies Descp: LUMP SUM TRANSPORTATION PLANNING &
MANAGEMENT SYSTEMS-2006 Length: 0.00
TlP#: AR-115B

Project: 0006227 Type Work: Special Studies Descp: LUMP SUM TRANSPORTATION PLANNING &
MANAGEMENT SYSTEMS-2007 Length: 0.00
TIP#: AR-115C

Project: 0006232 Type Work: Water Pollution Mitig. Descp: LUMP SUM WETLAND MITIGATION SITE
PURCHASE/RESTORATION -2005 Length: 0.00
TlP#: AR-116A

Project: 0006233 Type Work: Water POllution Mitig. Descp: LUMP SUM WETLAND MITIGATION SITE
PURCHASE/RESTORATION -2006 Length: 0.00
TlP#: AR-116B

Project: 0006234 Type Work: Water Pollution Mitig. Descp: LUMP SUM WETLAND MITIGATION SITE
PURCHASE/RESTORATION -2007 Length: 0.00
TlP#: AR-116C

Phase Fund CST STP

Year 2006

Federal $3,100,000

State $0

Phase Fund CST STP

Year 2007

Federal $3,100,000

State $0

Phase Fund CST STP

Year 2005

Federal $12,000,000

State $3,000,000

Phase Fund CST STP

Year 2006

Federal $12,000,000

State $3,000,000

Phase Fund CST STP

Year 2007

Federal $12,000,000

State $3,000,000

Phase Fund PE STP

Year 2005

Federal $800,000

State $200,000

Phase Fund

PE

STP

Year 2006

Federal $800,000

State $200,000

Phase Fund PE STP

Year 2007

Federal $2,400,000

State $600,000

Phase Fund CST STP

Year 2005

Federal $2,000,000

State $500,000

Phase Fund CST STP

Year 2006

Federal $2,000,000

State $500,000

Phase Fund CST STP

Year 2007

Federal $8,000,000

State $2,000,000

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0

Total
$3,100,000
Total
$3,100,000
Total
$15,000,000
Total
$15,000,000
Total
$15,000,000
Total
$1,000,000
Total
$1,000,000 Total $3,000,000 Total
$2,500,000
Total
$2,500,000 Total
$10,000,000
Page 10of300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM za/ZQQ5

All

Project: 0006246 Type Work: New Construction

Descp: LUMP SUM APPALACHIAN DEVELOPMENT LOCAL

ACCESS ROADS

Length: 0.00

TIP#:

Project: 0006247 Type Work: New Construction

Descp: LUMP SUM APPALACHIAN DEVELOPMENT LOCAL

ACCESS ROADS

Length: 0.00

TlP#:

Project: 0006248 Type Work: New Construction

Descp: LUMP SUM APPALACHIAN DEVELOPMENT LOCAL

ACCESS ROADS

Length: 0.00

TlP#:

Project: 0006294 Type Work: Intersection Improvement
Descp: PEDESTRIAN IMPROVEMENTS @ SEVEN LOCATIONS IN DISTRICT 6 Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006366 Type Work: Miscellaneous Improvement

Descp: DEBT SERVICE FOR GARVEE TO PAY BACK

BONDS. FY 2006

Length: 0.00

TIP#:

Project: 0006367 Type Work: Miscellaneous Improvement Descp: DEBT SERVICE FOR GARVEE TO PAY BACK
BONDS FY 2007 Length: 0.00
TlP#:

Project: 0006374 Type Work: ATMS/ITS

Descp: ATMS: MAINTENANCE OF ATMS EQUIPMENT

2007

Length: 0.00

TlP#: AR-427C

Project: 0006380 Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT AND MAINTENANCE OF
EDP EQUIPMENT 2006 Length: 0.00
TlP#: AR-428B

Project: 0006381 Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT AND MAINTENANCE OF
EDP EQUIPMENT 2007 Length: 0.00
TIP#: AR428C

Project: 0006387 Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT OF OUTDATED
HARDWARE (CMS, VDS, ETC) 2005 Length: 0.00
TlP#: AR429A

Project: 0006388 Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT OF OUTDATED
HARDWARfi (CMS, VDS, ETC) 2006 Length: 0.00
TlP#: AR-429B

Phase Fund CST APD

Phase Fund CST APD

Phase Fund CST APD

Phase Fund

PE

STP

CST STP

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST Bond

Phase Fund CST NHS

Year 2005
Year 2006
Year 2007
Year Underway
LUMP
Year 2006
Year 2007
Year 2007
Year 2006
Year 2007
Year 2005
Year 2006

Federal $800,000

State $200,000

Federal $800,000

State $200,000

Federal $800,000

State $200,000

Federal $162,000

State $18,000

Federal $13,898,360

State $3,474,590

Federal $57,473,181

State $14,368,295

Federal $5,600,000

State $1,400,000

Federal $1,200,000

State $300,000

Federal $1,600,000

State $400,000

Federal $0

State $1,500,000

Federal $1,200,000

State $300,000

Other $0

Total $1,000,000

Other $0

Total $1,000,000

Other $0

Total $1,000,000

Other $0

Total $180,000

Other $0

Total $17,372,950

Other $0

Total $71,841,476

Other $0

Total $7,000,000

Other $0

Total $1,500,000

Other $0

Total $2,000,000

Other $0

Total $1,500,000

Other $0

Total $1,500,000

Page 11 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM W/2QQ5

All
Project: 0006389 Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT OF OUTDATED
HARDWARE (CMS, VDS, ETC) 2007 Length: 0.00
TIP#: AR-429C

Project: 0006403 Type Work: Signals

Descp: FULL UPGRADE AND REPAIR OF METRO TRAFFIC

SIGNALS 2005

Lanes: Exist.

Prop.

Length: 0.00

TlP#: AR-445A

Project: 0006404 Type Work: Signals

Descp: FULL UPGRADE AND REPAIR OF METRO TRAFFIC

SIGNALS 2006

Length: 0.00

TlP#: AR445B

Project: 0006405 Type Work: Signals

Descp: FULL UPGRADE AND REPAIR OF METRO TRAFFIC

SIGNALS 2007

Length: 0.00

TlP#: AR-445C

Project: 0006408 Type Work: Signals Descp: TRAFFIC SIGNAL EFFICIENCY OPITIMIZATION
PROJECT 2005 Length: 0.00
TlP#: AR-446A

Project: 0006409 Type Work: Signals Descp: TRAFFIC SIGNAL EFFICIENCY OPITIMIZATION
PROJECT- 2006 Length: 0.00
TlP#: AR-446B

Project: 0006410 Type Work: Signals

Descp: TRAFFIC SIGNAL EFFICIENCY OPITIMIZATION

PROJECT- 2007

Length: 0.00

TlP#: AR446C

Project: 0006443 Type Work: Equip. Purchase Descp: LIGHT EMITTING DIODE (LED) STATEWIDE
UPGRADE 2005 Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006444 Type Work: Equip. Purchase Descp: LIGHT EMITTING DIODE (LED) STATEWIDE
UPGRADE 2006 Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006445 Type Work: Equip. Purchase

Descp: LIGHT EMITTING DIODE (LED) STATEWIDE

UPGRADE 2007

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006461 Type Work: Intersection Improvement Descp: PEDESTRIAN UPGRADES @ 11 INTERSECTIONS
IN DISTRICT 6 Length: 0.00

LUMP SUM PROJECT

TIP#:

Phase Fund CST NHS

Year 2007

Phase Fund CST Bond

Year 2005

Phase Fund CST Bond

Year 2006

Phase Fund CST Bond

Year 2007

Phase Fund CST Bond

Year 2005

Phase Fund CST Bond

Year 2006

Phase Fund CST Bond

Year 2007

Phase Fund

PE

STP

Year LUMP

Phase Fund

PE

STP

Year LUMP

Phase Fund

PE

STP

Year LUMP

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $1,600,000

State $400,000

Federal $0

State $11,200,000

Federal $0

State $11,200,000

Federal $0

State $11,200,000

Federal $0

State $10,000,000

Federal $0

State $10,000,000

Federal $0

State $10,000,000

Federal $3,240,000

State $360,000

Federal $3,240,000

State $360,000

Federal $3,240,000

State $360,000

Federal $297,000

State $33,000

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0

Total
$2,000,000
Total
$11,200,000
Total
$11,200,000
Total
$11,200,000
Total
$10,000,000
Total
$10,000,000
Total
$10,000,000
Total
$3,600,000 Total
$3,600,000
Total
$3,600,000
Total
$330,000
Page 12of300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2fT/2005

All

Project: 0006463 Type Work: Intersection Improvement

Descp: PEDESTRIAN UPGRADES @ 56 INTERSECTIONS

IN DISTRICT 2

Length: 0.00

LUMP SUM PROJECT

TtP#:

Project: 0006474 Type Work: Signing Descp: OVERHEAD LED ILLUMINATED STREET NAME
SIGNS@ 20 INTERSECTIONS Length: 0.00
TIP#:

Project: 0006475 Type Work: Traffic Signal

Descp: COUNTDOWN PEDESTRIAN SIGNAL HEADS@ 20

INTERSECTIONS

Length: 0.00

TIP#:

Project: 0006478 Type Work: ATMSIITS Descp: ATMS: SURVEILLANCE AND CMS, ENHANCEMENT
EXISTING SYSTEM-2005 Length: 0.00
TIP#: AR-928A

Project: 0006479 Type Work: ATMS/ITS Descp: ATMS: SURVEILLANCE AND CMS, ENHANCEMENT
EXISTING SYSTEM-2008 Length: 0.00
TtP#: AR-928B

Project: 0006651 Type Work: Scenic Hwy Program
Descp: GEORGIA SCENIC BYWAYS PROGRAM MARKETING AND PROMOTION Length: 0.00

LUMP SUM PROJECT

TtP#:

Project: 0006664 Type Work: Signals
Descp: SIGNAL HEAD REPLACEMENT@VARLOCATIONS IN SEVERAL DISTRICTS Length: 0.00

LUMP SUM PROJECT

TtP#:

Project: 0006686 Type Work: Preliminary Engineering
Descp: CONSULTANT DESIGN OF SAFETY PROJECTS 2005 Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006687 Type Work: Preliminary Engineering Descp: SAFETY PROJECTS-CONSULTANT DESIGN 2005

LUMP SUM PROJECT

Length: 0.00 TtP#:

Project: 0006692 Type Work: Research Descp: TRANSPORTATION RESEARCH
CENTER-FREIGHTITRADEIECONOMIC GROWTH Length: 0.00
TtP#:

Project: 0006704 Type Work: Special Studies

Oescp: MULTIMODAL CORRIDOR INVESTMENT STUDIES-

2006

Length: 0.00

TtP#: AR-460B

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $1,971,900

Phase Fund CST State

Year 2005

Federal $0

Phase Fund CST State

Year 2005

Federat $0

Phase Fund

PE

NHS

CST NHS

Year 2005 2005

Federal $80,000
$800,000

Phase Fund

PE

NHS

CST NHS

Year 2007 After 2007

Federal $80,000

Phase Fund CST STP

Year LUMP

Federal $100,000

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $130,500

Phase Fund

PE

STP

Year LUMP

Federal $1,800,000

Phase Fund

PE

STP

Year LUMP

Federal $1,800,000

Phase Fund CST EARMK

Year 2005

Federal $500,000

Phase Fund PE STP

Year 2006

Federal $400,000

State $219,100
State $150,000
State $150,000
State $20,000 $200,000
State $20,000
State $0
State $14,500
State $200,000
State $200,000
State $0
State $250,000

Other $0
Other $0
Other $0
Other $0 $0
Other $0
Other $25,000
Other $0
Other $0
Other $0
Other $0
Other $100,000

Total $2,191,000
Total $150,000
Total $150,000
Total $100,000 $1,000,000
Total $100,000
Total $125,000
Total $145,000
Total $2,000,000
Total $2.000,000
Total $500,000
Total $750,000

Page 13 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

All
Project: 0006706 Type Work: Special Studies Descp: COMMUNITY CHOICES PROGRAM - FY 2006

Length: 0.00 TlP#: AR-462B

Project: 0006708 Type Work: Special Studies Descp: COUNTY COMPREHENSIVE TRANSPORTATION
PLAN ASSIST PROGRAM-2006 Lenglh: 0.00
TlP#: AR-464B

Project: 0006709 Type Work: Special Studies Descp: COUNTY COMPREHENSIVE TRANSPORTATION
PLAN ASSIST PROGRAM-2007 Length: 0.00
TlP#: AR-464C

Project: 0006711 Type Work: Special Studies

Descp: REGIONAL TRANSIT SIDEWALK ACCESSIBILITY

STUDY - FY 2006

Length: 0.00

TlP#: AR-466B

Project: 0006713 Type Work: Special Studies Descp: LIVABLE CENTERS INITIATIVE (LCI) STUDIES - FY
2006 Lenglh: 0.00
TIP#: AR-80IB

Project: 0006714 Type Wort<: Special Studies Descp: LIVABLE CENTERS INITIATIVE (LCI) STUDIES - FY
2007 Lenglh: 0.00
TlP#: AR-80IC

Project: 0006737 Type Work: Unknown Descp: METRO ATLANTA ULTRA LOW SULFUR DIESEL
(ULSD) PROJECT-FY 2006 Length: 0.00
TlP#: AR-41IB

Project: 0006739 Type Work: Transit Projects Descp: SCHOOL BUS RETROFIT PROGRAM - FY 2006

Length: 0.00
TIP#: AR-412B
Project: 0006741 Type Work: Signals Descp: METRO ATLANTA ARTERIAL SIGNAL
OPTIMIZATION PROGRAM FY 2006 Length: 0.00
TIP#: AR-413B
Project: 0006742 Type Work: Signals Descp: METRO ATLANTA ARTERIAL SIGNAL
OPTIMIZATION PROGRAM FY 2007 Length: 0.00
TlP#: AR-413C
Project: 0006743 Type Work: Unknown Descp: TRUCK STOP ELECTRIFICATION PROGRAM

Length: 0.00 TIP#: AR-414

Phase Fund

PE

STP

Year 2006

Federal $80,000

State $0

Other $20,000

Phase Fund

PE

STP

Year 2006

Federal $1,500,000

State $0

Other $375,000

Phase Fund PE STP

Year 2007

Federal $750,000

State $0

Other $187,500

Phase Fund PE STP

Year 2006

Federal $80,000

State $0

Other $20,000

Phase Fund PE SIP

Year 2006

Federal $1,000,000

State $0

Other $250,000

Phase Fund PE STP

Year 2007

Federal $1,000,000

State $0

Other $250,000

Phase Fund CST CMAQ

Year 2006 .

Federal $1,512,255

State $0

Other $378,064

Phase Fund CST CMAQ

Year 2006

Federal $800,000

State $0

Other $200,000

Phase Fund CST CMAQ

Year 2006

Federal $7,500,000

State $0

Other $1,875,000

Phase Fund CST CMAQ

Year 2007

Federal $9,116,340

State $0

Other $2,279,085

Phase Fund CST CMAQ

Year 2006

Federal $2,750,000

State $0

Other $2,865,162

Total $100,000
Total $1,875,000
Total $937,500
Total $100,000
Total $1,250,000
Total $1,250,000
Total $1,890,319
Total $1,000,000
Total $9,375,000
Total $11,395,425
Total $5,615,162
Page 14 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

All

Project: 0006754 Type Work: Special Studies

Descp: TRAVEL DEMAND MODELING ASSISTANCE FY

2006

Length: 0.00

T1P#: AR-463B

Project: 0006757 Type Work: Special Studies Descp: CONGESTION MANAGEMENT SYSTEM - FY 2006

Length: 0.00 TIP#: AR-468B

Project: 0006758 Type Work: Transit Projects Descp: ACTIVITY CENTER SHUTTLE
SYSTEMS-OPERATING ASSISTANCE-FY 2006 Length: 0.00
TIP#: AR-650D
Project: 0006759 Type Work: Transit Projects Descp: ACTIVITY CENTER SHUTTLE
SYSTEMS-OPERATING ASSISTANCE-FY 2007 Length: 0.00
TIP#: AR-650E

Project: 0006763 Type Work: Transit Projects Descp: GRTA REGIONAL EXPRESS BUS SERVICE &
OPERATIONS - FY 2007 Length: 0.00
T1P#: AR-65IA
Project: 0006768 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS-TDM EMPLOYER
SERVICES & INCENTIVES - 2006 Length: 0.00
T1P#: AR-720B

Project: 0006769 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS-TDM EMPLOYER
SERVICES & INCENTIVES - 2007 Length: 0.00
T1P#: AR-720C
Project: 0006774 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS-TDM ADVERTISING &
PUBLIC RELATIONS - 2006 Length: 0.00
T1P#: AR-730B

Project: 0006775 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS-TOM ADVERTISING &
PUBLIC RELATIONS - 2007 Length: 0.00
TIP#: AR-730C

Project: 0006779 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS-TOM REGIONAL
RIDESHARING - FY 2007 - 2009 Length: 0.00
T1P#: AR-740A

Project: 0006782 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS MEASUREMENT &
NEEDS ASSESSMENT - 2006 Length: 0.00
TIP#: AR-750B

Phase Fund CST STP
Phase Fund CST STP
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ
Phase Fund CST CMAQ

Year 2006
Year 2006
Year 2006
Year 2007
Year 2007
Year 2006
Year 2007
Year 2006
Year 2007
Year 2007
Year 2006

Federal $150,000

State $0

Other $37,500

Federal $160,000

State $0

Other $40,000

Federal $1,500,000

State $0

Other $375,000

Federal $2,000,000

State $0

Other $500,000

Federal $1,225,289

State $0

Other $306,322

Federal $7,120,000

State $0

Other $1,780,000

Federal $7,520,000

State $0

Other $1,880,000

Federal $2,400,000

State $0

Other $600,000

Federal $2,400,000

State $0

Other $600,000

Federal $5,100,000

State $0

Other $0

Federal $800,000

State $0

Other $200,000

Total $187,500
Total $200,000
Total $1,875,000
Total $2,500,000
Total $1,531,611
Total $8,900,000
Total $9,400,000
Total $3,000,000
Total $3,000,000
Total $5,100,000
Total $1,000,000

Page 15 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

All
Project: 0006783 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS MEASUREMENT &
NEEDS ASSESSMENT 2007 Length: 0.00
TfP#: AR-750C

Phase Fund CST CMAO

Project: 0006788 Type Work: Bicycle/Ped. Facility Descp: WALK TO SCHOOL INITIATIVE FY 2005

Phase Fund CST STP

Length: 0.00 TIP#: AR-BPOO7A

Project: 0006938 Type Work: Intersection Improvement

Descp: LUMP SUM OPERATIONS FOR ANY AREA FY

2005

Length: 0.00

TIP#:

Phase Fund CST STP

Project: 0006939 Type Work: Intersection Improvement

Descp: LUMP SUM OPERATIONS FOR ANY AREA FY

2006

Length: 0.00

TIP#:

Phase Fund CST STP

Project: 0006940 Type Work: Intersection Improvement

Descp: LUMP SUM OPERATIONS FOR ANY AREA FY

2007

Length: 0.00

TIP#:

Phase Fund CST STP

Project: 0006946 Type Work: Vegetation Removal
Descp: ENHANCED RECOVERY AREA VEGETATION REMOVAL IN DISTRICT 3 Length: 0.00

LUMP SUM PROJECT

TfP#:

Phase Fund PE STP CST STP

Project: 0006947 Type Work: Vegetation Removal
Descp: ENHANCED RECOVERY AREA VEGETATION REMOVAL IN DISTRICT 6 Length: 0.00

LUMP SUM PROJECT

TfP#:

Phase Fund

PE

STP

CST STP

Project: 0006948 Type Work: Preliminary Engineering

Descp: STATEWIDE BRIDGE INSPECTION FOR 2005 PE

ONLY

Length: 0.00

TfP#:

Phase Fund

PE

Bridge

Project: 0006949 Type Work: Preliminary Engineering Descp: STATEWIDE BRIDGE INSPECTION FOR 2006 PE
ONLY Length: 0.00
TfP#:

Phase Fund PE Bridge

Project: 0006950 Type Work: Preliminary Engineering Descp: STATEWIDE BRiDGE INSPECTION FOR 2007 - PE
ONLY Length: 0.00
TfP#:

Phase Fund

PE

Bridge

Project: 0006958 Type Work: Miscellaneous Improvement Descp: SECTION 163 DUI INCENTIVE FUNDS

Phase Fund PE 008

Length: 0.00 TfP#:

Year 2007
Year 2006
Year 2005
Year 2006
Year 2007
Year LUMP LUMP
Year LUMP LUMP
Year LUMP
Year 2006
Year 2007
Year 2005

Federal $880,000

State $0

Federal $200,000

State $0

Federal $4,000,000

State $1,000,000

Federal $4,000,000

State $1,000,000

Federal $4,000,000

State $1,000,000

Federal $18,000
$522,000

State $2,000
$58,000

Federal $18,000
$405,000

State $2,000
$45,000

Federal $4,000,000

State $1,000,000

Federal $4,000,000

State $1,000,000

Federal $4,000,000

State $1,000,000

Federal $1,411,840

State $0

Other $220,000
Other $50,000
Other $0
Other $0
Other $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $0
Other $0

Total
$1,100,000
Total
$250,000
Total
$5,000,000
Total $5,000,000
Total
$5,000,000
Total
$20,000
$580,000
Total
$20,000
$450,000
Total
$5,000,000 Total $5,000,000
Total
$5,000,000
Total
$1,411,840
Page 16of300

...t'','
..........t.0::''''''''' .'
t,
.'t!
t.

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

All
Project: 0007235 Type Work: Miscellaneous Improvement Descp: LUMP SUM FOR ARC Q23 (NO NEW PROJECTS)

Length: 0.00 TIP#:

Project: 771106- Type Work: ATMS/ITS Descp: ATMS: REPLACEMENT AND MAINTENANCE OF
EDP EQUIPMENT PH 5 Length: 0.00
TIP#: AR-428A

Project: 771292- Type Work: ATMS/ITS

Descp: ATMS: MAINTENANCE OF ATMS EQUIPMENT

2006

Length: 0.00

TlP#: AR-427B

Project: 771295- Type Work: ATMS/ITS

Descp: ATMS: MAINTENANCE OF ATMS EQUIPMENT-

2005

Length: 0,00

TlP#: AR-427A

Project: 821055- Type Work: Bridge Rehab

Descp: OFF SYSTEM PILE ENCASEMENT PROJECT TO

REPAIR 4 BRIDGES

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 860110- Type Work: Rail Projects

Descp: TRANSPORTATION ALTERNATE STUDY-ATLANTA

TO CHATTANOOGA

Length: 0.00

TlP#: AR-267

Project: 870170- Type Work: Preliminary Engineering

Descp: TRAINING FOR TEA PROJECTS 3 YEAR

CONTRACT - PHASE 2

Length: 0,00

TlP#:

Project: MOOOO01 Type Work: Miscellaneous Improvement
Descp: CROSS DRAIN PIPE REPLACEMENTS IN DIST #3 @VARIOUS LOCATIONS Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: MOOO182 Type Work: Miscellaneous Improvement Descp: FORCE ACCOUNT MAINTENANCE ACTVITIES FOR
FY 2005 Length: 0.00
TlP#:

Project: MOOO183 Type Work: Miscellaneous Improvement Descp: FORCE ACCOUNT MAINTENANCE ACTVITIES FOR
FY 2006 Length: 0.00
TlP#:

Project: MOO0889 Type Work: Miscellaneous Improvement

Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN

DISTRICT 3

Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund CST STP

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST NHS

Phase Fund CST STP

Phase Fund

PE

HPP

Phase Fund PE STP

Phase Fund PE STP ROW STP CST STP
Phase Fund CST STP

Phase Fund CST STP

Phase Fund ROW STP CST STP

Year 2007
Year 2005
Year 2006
Year 2005
Year LUMP
Year 2005
Year 2005
Year Underway Underway
LUMP Year 2005
Year 2006
Year Underway
LUMP

Federal $2,567,200
Federal $1,200,000
Federal $4,800,000
Federal $4,800,000
Federal $40,000
Federal $5,800,000
Federal $75,000
Federal $84,800
Federal $12,000,000
Federal $12,000,000
Federal $394,400

State $0
State $300,000
State $1,200,000
State $1,200,000
State $10,000
State $1,450,000
State $0
State $21,200 State $3,000,000
State $3,000,000
State $98,600

Other $641,800
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0

Total $3,209,000
Total $1.500,000
Total $6,000,000
Total $6,000,000
Total $50.000
Total $7,250,000
Total $75,000
Total $106,000 Total $15,000,000
Total $15,000,000
Total $493,000

Page 17 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 20/2005

All

Project: MOO1854 Type Work: Bridges
oesco: PILE ENCASEMENT AT SEVERAL LOCATIONS IN DI5T 6
Length: 0.00

LUMPSUM PROJECT

TIP#;

Project: MOD1911 Type Work: Preliminary Engineering Descp: LICENSE AND SUPPORT AGREEMENT HMMS

LUMP SUM PROJECT

Length: 0.00 TlP1I:

Project: MOO2132 Type Work: Miscellaneous Improvement

Descp: FORCE ACCOUNT MAINTENANCE ACTVITIES FOR

FY 2007

Length: 0.00

TlP#:

Project: MOO2243 Type Work; Bridges oescp: PROPOSED PILE REHABILITATION AT SEV LOCS
IN 015T 3 Length: 0.00

LUMP SUM PROJECT

TlP#: Lump

Project: MOO2245 Type Work: Bridges De:;cp: PROPOSED PILE REHABILITATION AT SEVERAL
LOCS IN DISTRICT 4 Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: MOO2377 Type Work: Bridge Painting De:;cp. 1-20AT SEVERAL LOCS IN DIST 2 PROPOSED
BRIDGE PAINTING Length: 0.00

LUMPSUM PROJECT

TIP#: NHS LUMP S

PrOject: MOO2378 Type Work: Bridge Painting Descp: PROPOSED BRIDGE PAINTING AT SEVERAL
LOCATIONS IN DISTRICT 2 Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: MOO2384 Type Work: Bridge Painting
D8scp: PROPOSED BRIDGE PAINTING@ SEVERAL LOCATIONS IN DISTRICT 6 Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: MOO2424 Type Work: Bridges Descp: PROPOSED PILE REHABILITATION AT SEVERAL
LOeS IN DISTRICT 5 Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: MOO2486 Type Work: Bridges
Descp: PROPOSED BRIDGE REHABILITATlON@ SEVERAL LOCATIONS IN DIST 1 Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: MOO2557 Type Work: Bridges
Descp: PROPOSED BRIDGE REHABILITATION @ SEVERAL LOCATIONS IN DIST 6 Length: 0.00

LUMP SUM PROJECT

TlP#: lump

Phase Fund
CST STP
Phase Fund PE STP
Phase Fund CST STP
Phase Fund
PE STP CST STP
Phase Fund PE STP CST STP
Phase Fund CST 1M
Phase Fund CST STP
Phase Fund CST STP
Phase Fund PE STP CST STP
Phase Fund PE STP CST STP
Phase Fund PE STP CST STP

Year LUMP
Vear
LUMP
Vear
2007
Vear
Underway LUMP
Vear
Underway LUMP
Vear
LUMP
Year LUMP
Year LUMP
Year Underway
LUMP
Year LUMP LUMP
Vear
LUMP LUMP

Federal $1451,600
Federal $120,000
Federal $12,000,000
Federal $1,040,000
Federal $960,000
Federal $106,900
Federal $276,800
Federal $141,680
Federal $1,200,000
Federal $139,200 $780,000
Federal $148,800 $876,000

State
$37,400
State $30,000
State $3,000,000
State $260,000
State $240,000
State $12,100
State $69,200
State $35,420
State $300,000
State $34,800 $195,000
State $37,200 $219.000

Other $0

Total '187,000

Other $0

Total $150,000

Other $0

Total $15,000,000

Other $0

Total $1,300,000

Other $0

Total $1,200,000

Other $0

Total $121,000

Other $0

Total $346,000

Other $0

Total $177,100

Other $0

Total $1,500,000

Other $0 $0

Total $174,000 $975,000

Other $0 $0

Total $186,000 $1,095,000

Paoe 18 of 300

...\iw
-................
---
,.,..
------
'-
~ ~

STA TE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

All

Project: MOO2558 Type Work: Bridges Descp: PROPOSED BRIDGe R[HAOlLITATION@SEV
LOCATIONS IN DISTRICT 6 Length' 0.00

LUMP SUM PROJECT

TIP#:

Project: 1000672 Type Work: Transit Projects

Descp: FY 2005 SECTION 5311 CAPITAL FOR DOT

DISTRICT 2

Length' 0.00

TlP#:

Project: 1000673 Type Work: Transil Projects
rv Descp: 2005 SECTION 5311 OPERATING FOR DOT

DISTRICT 2

Length: 0.00

TIPit-:

Project: TOO0681 Type Work: TransitProjects

Dcscp: FY 2005 SECtiON 5310 CAPITAL FOR DHR

DISTRICT 1

Length' 0.00

TlP#:

Project: lOO0682 Type Work: Transit Projects Dcscp: FY 2005 SECTION 5310 CAPITAL FOR DHR
DISTRICT 2 Length: 0.00
TlP#:

Project: lOO0683 Type Work: Transit Projects Dcscp: FY 2005 SE:;CTION 5310 CAPITAL FOR DHR
DISTRICT 4 Length: 0.00
TlP#:

Project: TOO0684 Type Worle: Transit Projects

Dcscp: FY 2005 SECTION 5310 CAPITAL FOR DHR

DISTRICTS

Length.' 0.00

TlP#:

Project: TOO0685 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR DHR

DISTRICT 6

Lel1gth: 0.00

TIP#:

Project: TOOO686 Type Work: Transit Projects

Descp: F'"Y 2005 SECTION 5310 CAPITAL FOR DHR

DISTRICT 7

Length: 0,00

TlP#:

Project: TOOO687 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310, CAPITAL FOR DHR

DISTRICT 8

Length: 0.00

TJP#:

Project: TOO0688 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR DHR

DISTRICT 9

Length' 0.00

TlP#:

Phase Fund PE STP CST STP

Yea,
LUMP LUMP

Phase Fund CST Transit

Yea,
2005

Federal $80,000
$488,000

State $20,000 $122,000

Federal $369,200

State $46,650

Phase Fund
CST Transit

Year
2005

Federal $929,069

State $0

Phase Fund
CST Transit

Yea,
2005

Federal $164,742

State $41,185

Phase Fund CST Transit

Yea'
2005

Federal $118,980

State $29,745

Phase Fund CST Transit

Year
2005

Federal $121,268

State $30,317

Phase Fund CST Transit

Year
2005

Federal $84,658

State $21,165

Phase Fund CST Trenslt

Year 2005

Federal $57,201

State
$14,300

Phase Fund CST Transit

Year 2005

Federal $50,337

State $12,584

Phase Fund CST Transit

Year 2005

Federal $82,371

State $20,593

Phase Fund CST Transit

Yea'
2005

Federal $84,659

State $21,165

Other
$0 $0
Other $48.650
Other $929,069
Other
$0
Other
$0
Other
$0
Other $0
Other
$0
Other
$0
Other
$0
Other
$0

Total
$100,000 $610,000
Total
$466,500
Total $1,858,137
Total $205,927
Total $148,725
Total $151,585
Total $105,823
Total $71,501
Total $62,921
Total $102,964
Total $105,824

Page 19 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

All

Project: 1000889 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR DHR

DISTRICT 10

Length: 0.00

TIP#:

Project: 1000890 TypeWork: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR DHR

DISTRICT 11

Len(Jth: 0.00

TlP#:

Project: tOO0691 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR DHR

DISTRICT 12

Length: 0.00

TIP#:

Project: 1000701 Type Work: Transit Projects

Descp: FY 2005 SECTION 5311 CAPITAL FOR DOT

DISTRICT 1

LMgth: 0,00

TlP#:

Project TOO0702 Type Work: Transit Projects

Descp: FY 2005 SECTION 5311 OPERATING FOR DOT

DISTRICT 1

Length: 0.00

TlP#:

Project: TOO0703 Type Work: Transit Projects

De:scp: FY 2005 SECTION 5311 CAPITAL FOR DOT

DISTRICT 3

Length: 0.00

TlP#: AR-HE-S311

Project: TOO0704 Type Work: Transit Prolects

Descp: rv 2005 SECTION 5311 OPERATING FOR DOT

DISTRICT 3

LMgth: 0.00

TlPII: AR-HE-S311

Project: TOO0705 Type Work: Transit Projects Descp: FY 2005 SECTION 5311 CAPITAL FOR DOT
DISTRICT 4 Lfmgth: 0.00
TIP#:

Project: TOO0708 Type Work: Transit Projects

Descp: FY 2005 SECTION 5311 OPERATING FOR DOT

DISTRICT 4

Length: 0.00

TlP#:

Project: TOO0707 Type Work: Transit Projects

Ducp: FY 2005 SECTION 5311 CAPITAL FOR DOT

DISTRICT 5

Length: 0.00

TlP#:

Project: TOO0708 Type Work: Transit Projects

Descp: FY 2005 SECTION 5311 OPERATING FOR DOT

DISTRICT 5

Length: 0.00

TlP#:

Phase Fund CST Transit

Year
2005

Federal $89,235

State $22,309

Other $0

Phase Fund CST Transit

Year
2005

Federal $29.745

State
$7,436

Other $0

Phase Fund
CST Transit

Year 2005

Federal $384,398

State
$96,089

Other $0

Phase Fund
CST Transit

VH'
2005

Federal $216,800

State
$27,100

Other $27,100

Phase Fund CST Transit

Year 2005

Federal $557,193

State $0

Other $557,193

Phase Fund CST Transit

Year
2005

Federal $163,200

State $20,400

Other $20,400

Phase Fund CST Transit

Year
2005

Federal $202,352

Stafe
$U

Of her $202,532

Phase Fund CST Transit

Year
2005

Federal $802,400

Stafe $100,300

Other $100,300

Phase Fund CST Transit

VH'
2005

Federal $1,560,818

State $0

Other $1,560,818

Phase Fund CST Transit

VH'
2005

Federal $315,200

State $39,400

Other $39,400

Phase Fund CST Transit

VH'
2005

Federal $547,411

State $0

Other $547,411

Total $111,544
Total $37,161
Total $460.497
Total $271,000
Total $1,114,386
Total $204,000
r...,
$404,884
ToUI 51,003,000
Total $3,121,835
Total $394,000
Total $1,094,822

Page 20 of 300

.......t','','''',
t/
..t,::
.....'..t".',''''i''
t:

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005

All

Project: TOO0709 Type Work: Transit Projects

Descp: FY 2005 SECTION 5311 CAPITAL FOR DOT

DISTRICTS

Length: 0.00

TlP#: AR-CH-5311

Project: TOO0710 Type Work: Transit Projects

Descp: FY 2005 SECTION 5311 OPERATING FOR DOT

DISTRICT 6

Length: 0.00

TIP#: AR-CH-5311

Project: TOO0711 Type Work: Transit Projects Descp: FY 2005 SECTION 5311 DISCRETIONARY CAPITAL

Length: 0.00 TIP#:

Project: TOO0712 Type Work: Transit Projects

Descp: FY 2005 SECTION 5311 DISCRETIONARY

OPERATING

Length: 0,00

TlP#:

Project: TOO0713 Type Work: Transit Projects Descp: FY 2005 INTERCITY BUS PROGRAM

Length: 0.00 TlP#:

Project: TOO0961 Type Work: Transit Projects

Descp: FY 200S SECTION 5311 CAPITAL FOR DOT

DISTRICT 1

Length: 0.00

TlP#:

Project: TOO0962 Type Work: Transit Projects

Descp: FY 200S SECTION 5311 OPERATING FOR DOT

DISTRICT 1

Length: 0.00

TlP#:

Project: TOO0963 Type Work: Transit Projects

Descp: FY 200S SECTION 5311 CAPITAL FOR DOT

DISTRICT 2

Length: 0.00

T1P#:

Project: TOO0964 Type Work: Transit Projects

Descp: FY 200S SECTION 5311 OPERATING FOR DOT

DISTRICT 2

Length: 0,00

T1P#:

Project: TOO0965 Type Work: Transit Projects

Descp: FY 200S SECTION 5311 CAPITAL FOR DOT

DISTRICT 3

Length: 0.00

T1P#: AR-HE-5311

Project: TOO0966 Type Work: Transit Projects

Descp: FY 200S SECTION 5311 OPERATING FOR DOT

DISTRICT 3

Length: 0,00

TIP#: AR-HE-53 I I

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 200S

Phase Fund CST Transit

Year 200S

Phase Fund CST Transit

Year 200S

Phase Fund CST Transit

Year 200S

Phase Fund CST Transit

Year 200S

Phase Fund CST Transit

Year 200S

Federal $S07,7S0

State $75,970

Other $75,970

Federal $1,S24,723

State $0

Other $1,S24,723

Federal $240,000

State $30,000

Other $30,000

Federal $300,000

State $0

Other $300,000

Federal $1,254,183

State $15S,773

Other $15S,773

Federal $441,SOO

State $55,200

Other $55,200

Federal $S08,S10

State $0

Other $S08,S10

Federal $7S4,400

State $95,550

Other $95,550

Federal $974,015

State $0

Other $974,015

Federal $41,SOO

State $5,200

Other $5,200

Federal $212,618

State $0

Other $212,S18

Total $759,700
Total $3,249,445
Total $300,000
Total $SOO,OOO
Total $1,5S7,729
Total $552,000
Total $1,217,220
Total $955,500
Total $1,948,030
Total $52,000
Total $425,23S

Page 21 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2Q/2QQ5

All

Project: 1000967 Type WorK: Transit Projects

Oescp: FY 2006 SECTION 5311 CAPITAL FOR DOT

D1STRICT 4

Length: 0,00

TIP#:

Project: TOO0968 Type Work: Transit Projects D6scp: FY 2006 SECTION 5311 OPERATING FOR DOT
DISTRICT 4 Length: 000
TIP#:

Project: TOO0969 Type Work: Transit Projects

Dftocp,' FY 2006 SECTION 5311 CAPITAL FOR DOT

DISTRICT 5

Length: 0.00

TlP#:

Project 1000'970 Type Work: Transit Projects

OfJscp: FY 2006 SECTION 5311 OPERATING FOR DOT

DISTRICT 5

Length: 0.00

TlP#:

Project: TOO0971 Type Work: Transit Projects

Descp: FY 2006 SECTION 5311 CAPITAL FOR DOT

DISTRICT B

Length: 0.00

TlP#: ARCH53 I I

Project: 1000972 Type Work: Transit Projects Descp: FY 2006 SECTION 5311 OPERATING FOR DOT
DISTRICT 6 Length: 0,00
TIP#:

Project: TOO0973 Type Work: Transit Projects Descp: FY 2006 SECTION 5311 DISCRETIONARY CAPITAL

Length: 0.00 TIP#:

Project: 1000974 Type Worle Transit Projects

Descp: FY 2006 SECTION 5311 DISCRETIONARY

OPERATING

Length: 0.00

TIP#:

Project: TOO0975 Type Work: Transit Projects D6scp: FY 2006 INTERCITY BUS PROGRAM

Length: 0.00 T/P#:

Project: 1000976 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR

DISTRICT 1

Length: 0.00

TIP#:

Project: 1000977 Type Work: Transit Projects

~scp: FY 2006 SECTION 5310 CAPITAL FOR DHR

DISTRICT 2

Length: 0.00

TIP#:

Phase F"nd
CST Transit

Year
2006

Phase Fund CSI transit

Vea'
2006

Phase Fund CST Transit

Vea,
2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Vea,
2005

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Vea,
2006

Phase Fund CST Transit

Yea' 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Vea,
2006

Federal $2,680,000

State $335,000

Other $335,000

Federal $1,644.237

State

Other

$0 $1,644.237

Federal $137,920

State $17.240

Other $17.240

Federal $538,326

State $0

Other $538,326

Federal $1,059,680

State $132,460

Other $132,460

Federal $1,702,993

State

Other

$0 $1,702,993

Federal $240,000

State' $30,000

Other $30.000

Federal $300,000

State $0

Other $300.000

Federal $1,254,183

State $156.173

Other $156,773

Federal $172.978

State $43,245

Other $0

Federal $124,929

State $31,232

Other $0

Total $3.350.000
Total $3,288,474
Total $172,400
Total $1,076,652
Total $1.324.600
Tot.1 $3.405.986
Total $300.000
Total $600,000
Total $1,567,729
Total $216,223
Total $156,161

Page 22 of 300

~ ~
-.--------.---
.....
--
.....
v
~
-
~ ~

STATE TRANSPORTA TION IMPROVEMENT PROGRAM 20/2005

All

Project: 1000978 Type WorK: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR

OISTRICi 4

Length: 0.00

TIP#:

Project: 100Qt79 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR

DISTRiCTS

Length: 0.00

TlP#:

Project: TOOO981 Type Work.: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL. FOR DHR
DISTRICi 6 Length' 0.00
TlP#:

ProjeCt: TI)OO982 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR

DISTRICT?

Length: 0.00

TIP#:

Project: TOO0983 Type Work: Transit Projects Descp: FY 2006 SeCTlON 5310 CAPITAl. FOR DHR
DISTRICT B Length: 0.00
TJP#:

Project It)009a4 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAl- FOR DHR

DISTRICT 9

Length: 0.00

TIP#:

ProjeCt: TOO0985 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR

DISTRICT 10

Length: 0.00

TIP#:

Project TOO0986 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR
DISTRICT 11 Longth: 0.00
TIP#:

Project: TOO09B7 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR DHR
DISTRICT 12 Length: 0.00
TJP#:

Project: TOO1194 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT
DISTRICT 1 Length: 0.00
TJP#:

Project: TOO1195 Type Work: Transit Projects

Descp: FY 2007 SECTION 5311 OPERATING FOR DOT

DISTRICT 1

Length: 0.00

TJP#:

Phase Fund
CST Transit

Year 2006

Federal $127,331

State $31,833

Phase Fund CST Transit

Vear
2006

Federal $88,892

State $22,223

Phase Fund CST Transit

Vear
2006

Federal $60,062

State $15,016

Phase Fund CST Transit

Year 2006

Federal $52,854

State $13,214

Phase Fund
CST Transit

Vear
2006

Federal $86,490

State $21,822

Phase Fund
CST Transit

VNr
2006

Federal $88,892

State $22,223

Phase Fund
CSl Transit

VNr
2006

Federal $93,696

State $23,424

Phase Fund
CST Transit

Vear
2006

Federal $31,232

State $7,808

Phase Fund
CST Transit

Year 2006

Federal $403,817

State $100,904

Phase Fund
CST Transit

Vear
2007

Federal $225.600

State $28,200

Phase Fund
CST Transit

Vear
2007

Federal $645.270

Stat. $0

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
OCher $28,200
Other $645,270

ToYI $159,164
Toyl $111,115
Total $75,078
Total $88,088
Total $108,112
Total $111,115
Total $117,120
Total $39,040
Total $504,521
Total $282,000
Tom,
$1,290,540

Page 23 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5

All

Project: TOO1196 Type Work: Transit Projects

Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT

DISTRICT 2

Length: 0.00

TlP#:

Project: TOO1197 Type Work: Transit Projects

Descp: FY 2007 SECTION 5311 OPERATING FOR DOT

DISTRICT 2

Length: 0.00

TlP#:

Project: TOO1198 Type Work: Transit Projects

Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT

DISTRICT 3

Length: 0.00

TIP#: AR-HE-5311

Project: TOO1199 Type Work: Transit Projects

Descp: FY 2007 SECTION 5311 OPERATING FOR GDOT

DISTRICT 3

Length: 0.00

TIP#: AR-HE-5311

Project: TOO1200 Type Work: Transit Projects

Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT

DISTRICT 4

Length: 0.00

TIP#:

Project: T001201 Type Work: Transit Projects

Descp: FY 2007 SECTION 5311 OPERATING FOR DOT

DISTRICT 4

Length: 0.00

TlP#:

Project: TOO1202 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT
DISTRICT 5 Length: 0.00
TIP#:

Project: TOO1203 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 OPERATING FOR DOT
DISTRICT 5 Length: 0.00
TlP#:
Project: TOO1204 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 CAPITAL FOR DOT
DISTRICT 6 Length: 0.00
TIP#:
Project: TOO1205 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 OPERATING FOR DOT
DISTRICT 6 Length: 0.00
TlP#:
Project: TOO1206 Type Work: Transit Projects Descp: FY 2007 SECTION 5311 DISCRETIONARY CAPITAL

Length: 0.00 TlP#:

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Federal $529,200

State $66,150

Other $66,150

Federal $1,058,043

State $0

Other $1,058,043

Federal $84,800

State $10,600

Other $10,600

Federal $222,964

State $0

Other $222,964

Federal $2,168,000

State $271,000

Other $271,000

Federal $1,750,689

State $0

Other $1,750,689

Federal $187,200

State $23,400

Other $23,400

Federal $576,755

State $0

Other $576,755

Federal $601,360

State $75,170

Other $75,170

Federal $1,771,369

State $0

Other $1,771,369

Federal $240,000

State $30,000

Other $30,000

Total $661,500
Total $2,116,086
Total $106,000
Total $445,928
Total $2,710,000

'...''

Total $3,501,378
Total $234,000
Total $1,153,509

t

Total $751,700
Total $3,542,737
Total $300,000
Page 24 01300

t

:'.''....'e..1.'''


STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5

All
Project: TOO1207 Type Work: Transit Projects Descp: FY 2007 INTERCITY BUS PROGRAM

Length: 0.00 TlP#:

Project: TOO1208 Type Work: Transit Projects

Descp: FY 2007 SECTION 5311 DISCRETIONARY

OPERATING

Length: 0.00

TlP#:

Project: TOO1209 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR

DISTRICT 1

Length: 0.00

TlP#:

Project: TOO1210 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR

DISTRICT 2

Length: 0.00

TIP#:

Project: TOO1211 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR

DISTRICT 4

Length: 0.00

TIP#:

Project: TOO1212 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR

DISTRICT 5

Length: 0.00

TlP#:

Project: TOO1213 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR

DISTRICT 6

Length: 0.00

TIP#:

Project: TOO1214 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR

DISTRICT 7

Length: 0.00

TIP#:

Project: TOO1215 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR

DISTRICT 8

Length: 0.00

TlP#:

Project: TOO1216 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR

DISTRICT 9

Length: 0.00

TlP#:

Project: TOO1217 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR

DISTRICT 10

Length: 0.00

TIP#:

Phase Fund CST Transit

Year 2007

Federal $1.254.183

State $156,773

Phase Fund CST Transit

Year 2007

Federal $300,000

State $0

Phase Fund CST Transit

Year 2007

Federal $181,628

State $45,407

Phase Fund CST Transit

Year 2007

Federal $131,175

State $32,794

Phase Fund CST Transit

Year 2007

Federal $133,698

State $33,425

Phase Fund CST Transit

Year 2007

Federal $93,337

State $23,334

Phase Fund CST Transit

Year 2007

Federal $63,065

State $15,766

Phase Fund CST Transit

Year 2007

Federal $55.498

State $13.874

Phase Fund CST Transit

Year 2007

Federal $90,814

State $22,703

Phase Fund CST Transit

Year 2007

Federal $93,337

State $23,334

Phase Fund CST Transit

Year 2007

Federal $98,381

State $24,595

Other $156,773
Other $300,000
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0

Total $1.567.729
Total $600.000
Total $227.035
Total $163.969
Total $167.123
Total $116.671
Total $78.831
Total $69.372
Total $113,517
Total $116,671
Total $122,976

Page 25 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aJZQQ5

All
Project: T001218 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR
DISTRICT 11 Length: 0.00
TlP#:

Project: T001219 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DHR

DISTRICT 12

Length: 0.00

TIP#:

Phase Fund CST Transit

Year 2007

Federal $32,794

State $8,198

Phase Fund CST Transit

Year 2007

Federal $423,798

State $105,949

Other
$0

Total $40,992

Other
$0

Total $529,747

\e

: Page 26 of 300

t'
.'.0 .'.J .'.)
,:
t.
..''.'t l
,I\"
't.:'
......''t1"i'''''' .''i


STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aJ2QQ5

Appling

Project: 0001218 Type Work: Replace Bridge

Descp: SR 4IUS 1 @BLACKWATER&SWEETWATER

CKS S OF BAXLEY Lanes: Exist. 2 Prop. 4

Length: 1.00

TIP#:

Project: 0008528 Type Work: Sidewalks
Descp: SURRENCY'S SIDEWALK IMPROVEMENT PROJECT Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 522300. Type Work: Widening

Descp: SR 4IUS 1 FM BACON CL TO N OF SR 15/BAXLEY

INCL 3BRIDGES Lanes: Exist. 2 Prop. 4

Length: 9.10

TIP#:

Project: 533170. Type Work: Replace Bridge Descp: SR 15@ BIG SATILLA CREEK & OfF AT
PIERCE/APPLING COUNTY LN Length: 1.39
TIP#:

Phase Fund

PE

NHS

CST Bridge

Year Underway
2007

Federal $1,976,800

State $494,200

Phase Fund CST STP

Year LUMP

Federal $82,400

State $0

Phase Fund

PE

State

PE

Bond

ROW Bond

CST Bond

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005 2007
Year Underway Underway
2005

Federal

State

$0 $0
Federal

$4,605,000 $10,712,000
State

$3,533,600

$883,400

Other $0

Total $2,471,000

Other $20,600

Total $103,000

Other

Total

$0 $0
Other

$4,605,000 $10,712,000
Total

$0

$4,417,000

Page 27 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012 00 5

Atkinson
Project: 00006088 Type Work: Replace Bridge Descp: SR 135@DARKBAYCREEKAPP4 MI N OF
WILLACOOCHEE Length: 0,45 TlP#:
Project: "70'10- Type Work: Replace Bridge Descp: CR 42 NORTH OF SR 520 @ PUDDING CREEK
Leng/h" 0.50 TJP#:

Phase
PE
ROW
CST

Fund Bridge Brll:lge Bridge

Year
Underway Underway
2005

Phase Fund
PE Bridge
ROW lOGO' CST Bridge

Y. ., 2005 LOCl
Aher2007

Federal
$1.098,400
Federal $37.600
$0

Sfafe
$274,600
srere
$9,400
$0

Other
10
Other
$0 $0

To,.,
$1.373.000
Togi $47.000 SO

Page 28 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Bacon

Project OOOMS5 fype Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @VARIOUS lOC IN

DISTRICT 5

Length: 0.00

LUMP SUM PROJECT

TJP#:

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $280,000

State 570,000

Other
so

5350,000

,..

Pa"e 29 0' 300

STA TE TRA NSPOR TATlON IMPROVEMENT PROGRAM
2/7/2005

Baker

Project: 431710-

Type Work: Replace Bridge

Descp: SR 91/PETER ZACK GEER HWY @

ICHAWAYNOCHAWAY CK N OF SR 253 Length: 0.80

TlP#:

Project: 442860- Type Work: Replace Bridge

Descp: CR 67/JONES ROAD @ MILL CREEK APP 16 MI NW

OF NEWTON

Length: 0.21

TlP#:

Project: 471420.

Type Work: Replace Bridge

Descp: CR 121/CLEAR LAKE ROAD @

CHICKASAWHATCHEE CREEK E OF SR 37 Length: 0.44

TlP#:

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2005

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2005

Federal
$2,644,000
Federal $0
$408,800
Federal $0
$816,000

State
$661,000
State $0
$102,200
State $0
$204,000

Other
$0
Other $10,000
$0
Other $50,000
$0

Total $3.305.000 Total $10,000
$511,000
Total
$50,000
$1,020,000
.'~I
Page 30 of 300

.1
..,'


STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Baldwin

Project: 0000346 Type Work: New Construction

Descp: FALL LINE FWY ON NEW LOC FM US

441/WILKINSON CO TO SR 24

Lanes: Exist. 0 Prop, 4

Length: 9.33

TIP#:

Project: 0004527 Type Work: Intersection Improvement Descp: SR 243/US 441 @ CR 466/SWINT & CS
670/CARAKER/MILLEDGEVILLE Length: 0.20

LUMP SUM PROJECT

TIP#:

Project: 0006017 Type Work: Intersection Improvement

Descp: SR 22 @ NORTH JEFFERSON ST IN

MILLEDGEVILLE

Length: 0.40

LUMP SUM PROJECT

TIP#:

Project: 0006028 Type Work: MedianWorl<.

Descp: SR 24/US 441/NORTH COLUMBIA ST FM LOG

CABIN RD TO MLK AVE

Length: 4.67

T1P#:

Project: 0006471 Type Work: Replace Bridge Descp: CR 69/BROWNS CROSSING RD @ FISHING
CREEK Length: 0.40
TIP#:

Project: 0006491 Type Work: Intersection Improvement Descp: SR 29/US 441/ROBERSON MILL ROAD @ CR
10/GARRETT WAY Length: 0.19

LUMP SUM PROJECT

TIP#:

Project: 0006690 Type Work: Multi-use Trail Descp: OCONEE RIVER GREENWAY AND RIVERFRONT
PARK Length: 0.00
TIP#:

Project: 222280. Type Work: Widening

Descp: SR 24/SR 540 FM SOUTH OF CR 186 TO CR 10 IN

WASHINGTON CO Lanes: Exist. 2 Prop. 4

Length: 7.80

T1P#:

Project: 231450- Type Work: Widening

Descp: SR 49 FM JUST W. OF FELTON RD TO EAST OF

MILLEDGEVILLE BYP Lanes: Exist. 2 Prop. 4

Length: 2.80

TIP#:

Project: 232240. Type Work: Intersection Improvement

Descp: SR 221SR 24 AT LAKE LAUREL RD/CR 472 EAST

OF MILLEDGEVILLE

Length: 0.45

LUMP SUM PROJECT

TIP#:

Project: 232260. Type Work: Replace Bridge Descp: SR 22@ CS 558 TATTNALL STREET IN WEST
MILLEDGEVILLE Length: 0.21
TIP#:

Phase Fund ROW Bond CST Bond

Year Underway
2007

Phase Fund ROW Local CST STP

Year LOCL LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year 2006 LOCL After 2007

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund CST EARM

Year 2005

Phase Fund

PE

HPP

ROW HPP

CST Bond

Year Underway
2005 2007

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year Underway
2006 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
LUMP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 After 2007

Federal

State

$0 $48,487,000

Other $0

Federal $0
$377,100

State $0
$41,900

Other $1,064,276
$0

Federal $27,900
$113,400
Federal $200,000

State $3,100
$12,600
State $50,000

Other $0 $0
Other $0

Federal $34,400 $0

State $8,600 $0

Other $0
$50,000

Federal $297,000

State $33,000

Other $0

Federal $250,000

State $0

Other $0

Federal

State

$2,251,200 $0

$562,800 $21,994,000

Federal $440,000

State $110,000

Other $0 $0
Other $0

Federal

State

Other

$1,026,000 Federal $16,000

$114,000 State
$4,000

$0 Other
$0

Total $48,487,000
Total $1,064,276
$419,000
Total $31,000
$126,000 Total $250,000
Total $43,000 $50,000
Total $330,000
Total $250,000
Total $2,814,000 $21,994,000
Total $550,000
Total
$1,140,000 Total $20,000

Page 31 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2QQ5

Baldwin

Project: 245405. Type Work: Replace Bridge

Descp: SR 243/US 441 BUS. @ FISHING CREEK IN

MILLEDGEVILLE

Length: 0.23

TfP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Year underway
2006 Atter2007 Atter2007

Federal $434,400

State $108,600

Other $0

Total $543,000
.

Page32of300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2flI2QQ5

Banks

Project: 0004596 Type Work: Water Pollution Mitig. Descp: 279.5 STREAM CREDITS FOR PI
142265-IBRST-0885(3) Length: 0.00

LUMP SUM PROJECT

TfP#:

Project: 0005921 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ 5 LOCS ALONG SR 15/US 441 Length: 0.00

LUMP SUM PROJECT

TfP#:

Project: 0006601 Type Work: Sireeiscapes Descp: TOWN OF HOMER HISTORIC US 441
REVITALIZATION PROGRAM Length: 4.06

LUMP SUM PROJECT

TIP#:

Project: 110670- Type Work: Widening Descp: 1-85FM N/SR 15/US 441 TO N/SR 63

Lanes: Exist. 4 Prop. 6

Length: 4.50 TIP#:

Project: 110680- Type Work: Widening Descp: 1-85FM NISR 63 TO NISR 51 IN FRANKLIN COUNTY

Lanes: Exist. 4 Prop. 6

Length: 6.10 TfP#:

Phase Fund ROW STP

Year LUMP

Federal $9,600

State $2,400

Phase Fund CST STP

Year LUMP

Federal $320,000

State $80,000

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase Fund PE NHS PE NHS CST Bond

Year Underway
2005 After 2007

Federal $1,440,000

Phase PE PE CST

Fund NHS NHS Bond

Year Underway
2005 After 2007

Federal $2,000,000

State $360,000
State $500,000

Other $0
Other $0
Other $125,000
Other $0
Other $0

Total $12,000
Total $400,000
Total $625,000
Total $1,800,000
Total $2,500.000

Page 33 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 20/2005

Barrow
Project: 0001038 Type Work: Descp: SR 124 @ SR 211

Intersection Improvement

Length: 0.40 TIP#: BA-002

Project: 0006326 Type Work: New Construction

Descp: WEST WINDER BYP FM MATTHEWS SCH RD TO

PEARL PENECOST RD-PH 1

Lanes: Exist. 0 Prop. 2

Lenglh: 0.34

TIP#: BA-005A

Project: 0006327 Type Work: Widening Descp: WEST WINDER BYP FM SR 316 TO SR 211 - PH II

Lanes: Exist. 2 Prop. 4

Length: 3.37 TIP#: I3A-005B

Project: 0006449 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS
LOCATIONS IN BARROW COUNTY Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 110610 Type Work: Widening

Descp: 1-85 FM HAMIL TON RD TO N/SR 211/FARM

MARKET RD IN BARROW

Lanes: Exist. 4 Prop. 6

Length: 6.30

TIP#: GW-AR-192

Project: 110620. Type Work: Widening

Descp: 1-85 FM N/SR 211 TO N/SR 60 IN JACKSON

COUNTY

Lanes: Exist. 4 Prop. 6

Length: 5.94

TlP#: I3A-008A&B

Project: 132970. Type Work: Replace Bridge Descp: SR l11WINDERMONROE HWY. @ MARBURG
CREEK SO OF WINDER Length: 0.18
TlP#: BA-OII

Project: 132971. Type Work: Replace Bridge Descp: SR llIWINDER-MONROE HWY @ SCOTT CREEK
1.7 MI S OF BETHLEHEM Length: 0.21
TlP#: BA-OI2A&B

Project: T001115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rail - Phase II

Length: 0.00 TlP#:

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Phase Fund PE STP CST STP

Year 2005 After 2007

Phase Fund PE STP CST STP

Year 2005 After 2007

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund PE NHS ROW NHS CST Bond

Year Underway
2006 After 2007

Phase Fund PE NHS ROW NHS CST Bond

Year Underway
2005 2007

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2007

Phase Fund PE Bridge ROW Bridge CST Bridge CST STP
Phase Fund CST HPP

Year Underway
2006 After 2007 After 2007
Year 2005

Federal $80,000

State $20,000

Federal $4,000

State $1,000

Federal $4,000

State $1,000

Federal $224,000

State $56,000

Federal $4.116,000

State $1.029,000

Federal

State

$320,000 $0

$80,000 $13,495,000

Federal

State

$1.380,800 Federal $16,000

$345,200 State
$4,000

Federal $5.702,000

State $1,425,500

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0 $0
Other
$0 Other
$0
Other $0

Total $100,000 Total
$5.000
Total $5,000
Total $280,000 Total $5.145,000 Total $400,000 $13,495,000 Total $1,726,000 Total $20,000 Total $7.127,500
Page 34 of 300

.'

STATE TRANSPORTA TION IMPROVEMENT PROGRAM 217/2005

Bartow

Project: 0000291 Type Work: RR Corridors

Descp: OLD ALA RD/SR 113 RELOC FM EAST OF SR 293

@ CSX RR TO 1-75 Lanes: Exist. 0 Prop. 4

Length: 1.18

TlP#: 8T-027A

Project: 0000397 Type Work: Intersection Improvement

Descp: SR 3/US 41 @ CR 1097 & CR 397--RELOCATE

INTERSECTION

Length: 0.30

TlP#:

Project: 0000932 Type Work: Interchange Descp: 1-75/SR401 UPGRADES @ SR 61

Length: 0.20 TlP#:

Project: 0000994 Type Work: Intersection Improvement

Descp: SR 3IUS 41 AT GRASS DALE RD/CR 155 & IRON

BELT RD/CR 232

Length: 0.30

TlP#:

Project: 0002626 Type Work: Interchange

Descp: US 41/SR 3 AND US 411/SR 61 INTERCHANGE

RECONSTRUCTION

Lanes: Ex/st. 2 Prop. 4

Length: 0.98

TlP#:

Project: 0003082 Type Work: Replace Bridge

Descp: CR 9821PERRY ROAD @ LITTLE PINE LOG CREEK

8 MI NW OF WHITE

Length: 0.40

TlP#:

Project: 0003450 Type Work: Replace Bridge Descp: CR 2321IRON BELT RD @ NANCY CREEK 3.3 MI
NW OF CARTERSVILLE Length: 0.20
TlP#:

Project: 0003770 Type Work: Roadway Project

Descp: CR 633/GLADE RD FM CR 384/BARTOW CARVER

TO CR 605/HOMESTEAD

Lanes: Exist. 2 Prop. 3

Length: 4.00

TlP#: 8T-015

Project: 0004591 Type Work: Water Pollution Mitig.

Descp: 873 STREAM CREDITS FOR PI

621350-/STP-012-1(71 )

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0004888 Type Work: Intersection Improvement Descp: SR 3/US 41 AT CR 179/CEDAR CREEK ROAD

LUMP SUM PROJECT

Length: 0.20 TlP#:

Project: 0005870 Type Work: Bridge Rehab

Descp: CR 204/NALLEY ROAD @ LITTLE PINE LOG CREEK

7.2 MI N OF WHITE

Length: 0.40

TlP#:

Phase Fund ROW STP CST STP

Year 2005 After 2007

Phase PE ROW CST

Fund STP STP STP

Year 2007 After 2007 After 2007

Phase Fund CST 1M

Year 2007

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL 2007

Phase Fund ROW STP CST STP

Year 2005 2006

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2007

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2006

Phase Fund PE STP CST STP

Year 2006 After 2007

Phase Fund ROW STP

Year LUMP

Phase PE ROW CST

Fund STP STP STP

Year Underway
LUMP LUMP

Phase Fund PE State ROW Local CST State

Year Underway
LOCL 2005

Federal $1,487,700

State $371,925

Federal $52,000

State $13,000

Federal $2,520,000

State $280,000

Federal
$0 $367,200

State
$0 $91,800

Federal $720,000 $9,104,000

State $180,000 $2,276,000

Federal
$0 $517,600
Federal
$0 $1.012,000
Federal $308,000

State $0
$129,400
State $0
$253,000
State $77,000

Federal $28,800

State $7,200

Federal
$20,160 $212,400
Federal
$0 $0

State $2,240
$23,600
State $0
$500,000

Other $0
Other $0
Other $0
Other $458,000
$0 Other
$0 $0
Other $10,000
$0 Other $38,000
$0 Other
$0
Other $0
Other $0 $0
Other $0 $0

Total $1,859,625
Total $65,000
Total $2,800,000
Total $458,000 $459,000
Total $900,000 $11,380,000
Total $10,000 $647,000
Total $38,000 $1,265,000
Total $385,000
Total $36,000
Total $22,400 $236,000
Total $0
$500,000

Page 35 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Bartow

Project: 0006297 Type Work: Barriers

Descp: 1-75CABLE MEDIAN BARRIERS IN BARTOW

COUNTY

Length: 14,00

LUMP SUM PROJECT

TlP#:

Project: 0006583 Type Work: Multi-use Trail Descp: CITY OF EUHARLEE SHARED-USE PATHWAY

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006619 Type Work: Streetscapes Descp: ADAIRSVILLE PUBLIC SQUARE STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006620 Type Work: Streetscapes Descp: CARTERSVILLE MAIN STREET STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006669 Type Work: Rights-Of-Way Descp: SR 20/US 411 ACCESS RIGHTS FROM FLOYD
COUNTY TO SR 3/US 41 Length: 11.52
TlP#:

Project: 620832- Type Work: Replace Bridge Descp: SR 61/SR 113@ ETOWAH RIVER & APPROACHES

Lanes: Exist. 2 Prop. 4

Length: 0.63 TlP#:

Project: 621255- Type Work: Widening

Descp: SR 61/SR 113 FM CR 533 NO TO PLYMOUTH

DRiCARTERSVILLEIEXC BR

Lanes: Exist. 2 Prop. 4

Length: 2.61

TlP#:

Project: 621350- Type Work: Widening

Descp: SR 20 FM 1-75TO US 411/SR 61 PART

RELOCATION

Lanes: Exist. 2 Prop. 4

Length: 2.47

TlP#:

Project: 621415- Type Work: Widening

Descp: OLD ALA RD/SR 113 RELOC FM CR 699 TO EAST

OF SR 293 @ CSX RR

Lanes: Exist. 2 Prop. 4

Length: 1.95

TIP#:

Project: 621710- Type Work: Passing Lanes

Descp: SR 20 EB & WB MP 17.8-19.3; EB 19.3-20.75; WB

MP20.75-21.95

Lanes: Exist. 2 Prop. 3

Length: 4.15

TIP#:

Project: 621760. Type Work: Replace Bridge Descp: STATE ROUTE 113 @ RICHLAND CREEK

Length: 0.40 TlP#:

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $998,100

State $110,900

Phase Fund CST STP

Year LUMP

Federal $232,000

State $0

Phase Fund CST STP

Year LUMP

Federal $350,400

State $0

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase Fund PE NHS ROW NHS

Year 2005 After 2007

Federal $4,000

State $1,000

Phase Fund

PE

Bridge

ROW Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

STP

ROW STP

ROW STP

CST STP

Phase Fund PE STP ROW STP CST STP

Year Underway Underway Underway
2005
Year Underway Underway Underway
2005
Year Underway
2005 2006

Phase Fund ROW STP CST STP

Year 2005 After 2007

Federal

State

$2.095,200 Federal

$523.800 State

$7,673,600 Federal
$3,456,000 $9,652,000

$1,918,400 State
$864,000 $2,413,000

Federal $2,338,200

State $584,550

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2006

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006

Federat
$2,212,800 $6,686,400

State
$553,200 $1,671,600

Federal
$16.000 $264,000

State
$4,000 $66,000

Other $0
Other $58,000
Other $87,600
Other $125,000
Other $0
Other
$0 Other
$0 Other
$0 $0 Other $0
Other $0 $0
Other $0 $0

Total
$1,109,000 Total
$290,000
Total
$438,000
Total $625,000 Total $5.000 Total $2.619.000 Total $9,592.000 Total $4,320,000 $12,065,000 Total
$2,922.750
Total $2,766,000 $8,358,000 Total $20,000 $330,000 Page 36 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 2J7I2QQ5

Bartow
Project: 631510. Type Work: Bridge Rehab Descp: SR 20 AT STAMP CREEK 5.8 MI SE OF WHITE

Length: 0.22 TIP#:

Project: 631515- Type Work: Bridge Rehab Descp: SR 20 @ BOSTON CREEK 6.2 MILES SE OF WHITE

Length: 0.22 TIP#:

Project: 641870- Type Work: Intersection Improvement Descp: SR 293 @ GRASSDALE RD/CR 155

Length: 0.26 TlP#:

Project: 661950. Type Work: New Construction Descp: US 411 RELOC FM SR 20/3/US 41 TO 1-75

Lanes: Exist. 0 Prop. 4

Length: 6.53 TlP#: See AR 230

Project: 671225. Type Work: Replace Bridge

Descp: CR 851/HARDIN BRIDGE ROAD @ ETOWAH RIVER

NORTH OF EUHARLEE Lanes: Exist. 1 Prop. 2

Length: 0.27

TIP#:

Project: M002386 Type Work: Bridge Painting
Descp: PROPOSED BRIDGE PAINTING AT SEV LOCS IN BARTOWIDADEIGORDON Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: M002789 Type Work: Bridges

Descp: 1-75@5LOCATIONS IN BARTOW & GORDON-

DECK REHAB

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: M002965 Type Work: Guardrail

Descp: 1-75FROM SR 5 CONNECTOR TO CR 633/RED TOP

MOUNTAIN ROAD

Length: 24.53

TlP#: AR126G

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2006

Federal
$30,600 $1,352,800

State
$7,650 $338,200

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2006

Federal
$19,200 $1,582,400

State
$4,800 $395,600

Phase Fund

PE

STP

ROW Local

CST STP

Year 2007 LOCL After 2007

Federal $24,000 $0

State $6,000 $0

Phase Fund

PE

State

PE

NHS

ROW NHS

CST NHS

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway Underway
2007 After 2007
Year Underway
LOCL 2007

Federal
$13,329,600 Federal $0
$1,558,400

State
$3,332,400
State $0
$389,600

Phase Fund CST 1M

Year LUMP

Federal $286,560

State $31,840

Phase Fund

PE

1M

CST 1M

Year LUMP LUMP

Federal $180,000 $1,800,000

State $20,000 $200,000

Phase Fund

PE

1M

CST 1M

Year 2005 2005

Federal $1,800,000 $38,400,000

State $200,000 $9,600,000

Other
$0 $0
Other
$0 $0
Other $0 $0

Total
$38,250 $1,691,000
Total
$24,000 $1,978,000
Total $30,000
$0

Other

Total

$0

$16,662,000

Other
$10,000 $0

Total
$10,000 $1,948,000

Other $0

Total $318,400

Other $0 $0

Total $200,000 $2,000,000

Other $0 $0

Total $2,000,000 $48,000,000

Page 37 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM za/ZQQ5

Ben Hill

Project: 0005927 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS @ VAR LOCS IN
BEN HILLITURNERIWORTH Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006529 Type Work: Multi-use Trail Descp: JEFFERSON DAVIS HERITAGE TRAIL

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 432155- Type Work: Replace Bridge

Descp: SR 90 @ LITTLE HOUSE CREEK 7.1 MI N OF

FITZGERALD

Length: 0.47

TIP#:

Phase Fund CST STP

Year LUMP

Federal $1,040,000

Stale $260,000

Phase Fund CST STP

Year LUMP

Federal $308,000

Stale $0

Phase Fund PE Bridge ROW Bridge CST Bridge

Year UndelWay
2006 After 2007

Federat $16,000

State $4,000

Other $0
Other $77,000
Other $0

Total
$1,300,000
Total
$385,000
Total
$20,000
Page38of300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Berrien
Project: 0001913 Type Work: Intersection Improvement Descp: SR 11/US 129 @ CR 37/HAZEL AVENUE

LUMP SUM PROJECT

Length: 0.65 TlP#:

Project: 0006530 Type Work: Streetscapes

Descp: NASHVILLE DOWNTOWN STREETS CAPE

PROJECT

Lenglh: 0.00

LUMP SUM PROJECT

TIP#:

Project: 442920- Type Work: Replace Bridge

Descp: SR 64/SR 168 @ ALAPAHA RIVER & OVERFLOW @

BERRIEN/LANIER LN

Length: 1.08

TlP#:

Project: 442925. Type Work: Replace Bridge

Descp: SR 168 @ TEN MILE CREEK 4.0 MI EAST OF JCT

SR 11

Length: 0.32

TIP#:

Project: 442930- Type Work: Replace Bridge

Descp: SR 168 @ FIVE MILE CREEK 3 MI WEST OF JCT

SR 135

Length: 0.28

TIP#:

Project: 442961. Type Work: Replace Bridge Descp: SR 122@ CAT CREEK APP 9 MI E OF HAHIRA

Length: 0.25
TIP#:
Project: 442991- Type Work: Replace Bridge Descp: SR 37 @ WITH LACOOCHEE RIVER & OVERFLOW
AT COOK-BERRIEN CO LN Length: 0.95
TIP#:

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2006 2006
Year Underway Underway
2005

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway
2005

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Federal $411,300 $833,400 Federal $463,200
Federal
$2,960,800 $299,200 Federal
$916,080 Federal
$1,083,200 Federal
$1,403,200 Federal
$3,852,000

State $45,700 $92,600 State
$0
State
$740,200 $74,800 State
$229,020 State
$270,800 State
$350,800 State
$963.000

Other $0 $0
Other $115,800
Other
$0 $0 Other
$0 Other
$0 Other
$0 Other
$0

Total $457,000 $926,000 Total $579,000
Total
$3,701,000 $374,000 Total
$1,145,100 Total
$1,354,000 Total
$1.754.000 Total
$4.815,000

Page 39 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM WaDD5

Bibb

Project: 0000813 Type Work: Widening

Descp: SR 87/US 23 FROM SR 96fTWIGGS TO 1-16 IN BIBB

COUNTY Lanes: Exist. 2

Prop. 4

Lenglh: 19.96

TlP#: MCN-42

Project: 0000954 Type Work: Lighting

Descp: 1-16 FM E OF CENTRAL GA RR TO SR 87/US 129 IN

MACON-LIGHTING

Lenglh: 3.96

LUMP SUM PROJECT

TIP#: MCN-72

Project: 0001017 Type Work: Bicycle/Ped. Facility

Descp: DNR REC TRAILS - OCMULGEE GREENWAY TRAIL

FM 2ND TO GATEWAY

Length: 0.50

LUMP SUM PROJECT

TIP#: DNR-}

Project: 0001078 Type Work: Bicycle/Ped. Facility

Descp: DNR REC TRAILS - OCMULGEE GREENWAY TRAIL

FM SPRING TO 2ND

Length: 0.50

LUMP SUM PROJECT

TlP#: DNR-4

Project: 0001487 Type Work: Bicycle/Ped. Facility
Descp: DNR RECREATIONAL TRAILS PROG - CENTRAL CITY PARK TRAIL HEAD Length: 0.00

LUMP SUM PROJECT

TlP#: DNR-I

Project: 0001489 Type Work: Bicycle/Ped. Facility Descp: DNR REC TRAILS PROG - PIERCE AVENUE
WATER WORKS TRAIL HEAD Length: 0.00

LUMP SUM PROJECT

TlP#: DNR-I

Project: 0002487 Type Work: Lighting Descp: 1-75LIGHTING AT RIVERSIDE DRIVE
INTERCHANGE IN MACON Length: 0.40

LUMP SUM PROJECT

TlP#: MCN-79

Project: 0004455 Type Work: Widening

Descp: SR 11/INDUSTRIAL HWY FROM AVONDALE MILL

RD TO WALDEN RD Lanes: Exist. 2 Prop. 3

Length: 1.70

TlP#: MCN-77

Project: 0004595 Type Work: Water Pollution Mitig. Descp: 444 STREAM CREDITS FOR PI
312090-/NHIM-75-2(211 ) Length: 0.00

LUMP SUM PROJECT

TIP#: MCN-60

Project: 0006492 Type Work: Striping Descp: SIGNAGE & STRIPING @ VARIOUS RAIL
CROSSINGS IN BIBB & JONES Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 311000- Type Work: Widening

Descp: 1-16/MACON FM SR 11 EAST TO SR 87 INCL

BRIDGES & CD /EXC MLK

Lanes: Exist. 4 Prop. 6

Length: 1.86

TlP#: MCN-IO

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 After 2007 After 2007

Phase Fund

PE

Other

CST NHS

Year Underway
LUMP

Federal $256,000
Federal $1.200.000

State $64.000
State $300.000

Phase Fund CST Rec Trails

Year LUMP

Federal $100,000

State $0

Phase Fund CST Rec Trails

Year LUMP

Federal $100,000

State $0

Phase Fund CST Rec Trails

Year LUMP

Federal $100,000

State $0

Phase Fund CST Rec Trails

Year LUMP

Federal $100.000

State $0

Phase Fund CST NHS

Year LUMP

Federal $136.000

State $34.000

Phase Fund

PE

STP

CST STP

Year Underway
2006

Federal $176.000

State $44.000

Phase. Fund ROW STP

Year LUMP

Federal $14,400

State $3,600

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $48.000

State $0

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year Underway
2005 After 2007

Federal $1.972.000

State $493.000

Other $0
Other $0
Other $25,000
Other $25.000
Other $25.000
Other $25.000
Other $0
Other $0
Other $0
Other $0
Other $0

Total
$320,000
Total
$1.500.000 Total
$125,000
Total
$125.000
Total
$125,000
Total
$125,000
Total
$170,000
Total
$220,000
Total
$18.000
Total $48.000
Total
$2,465.000
Page 40 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM waDD5

Bibb

Project: 311005. Type Work: Bridge Rehab

Descp: 1-16IN MACON- BRIDGE AT MARTIN LUTHER KING

DRIVE Lanes: Exist. 4

Prop. 6

Length: 0.25

TIP#: MCN66

Project: 311400- Type Work: Widening

Descp: 1-75/MACON FROM PIERCE AVE/CR 478 EAST TO

1-16 Lanes: Exist. 4

Prop. 6

Length: 1.61

TIP#: MCN-13

Project: 311410- Type Work: Interchange

Descp: 1-16/175 FM 1-75@ HARDEMAN AVE TO 116 @

SPRING ST Lanes: Exist. 4 Prop. 6

Length: 1.10

TIP#: MCN9

Project: 311465- Type Work: Interchange Descp: 1-75/1-475 INTERCHANGE @ HARTLEY BRIDGE RD.

Length: 2.70 TlP#: MCNIB
Project: 311910- Type Work: Interchange Descp: 1-75NEW INTERCHANGE AT SARDIS CHURCH RD

Length: 0.20 TlP#: MCN15

Project: 312090. Type Work: Widening

Descp: 1-75FM PIERCE AVE/SR 247/US 41 TO

ARKWRIGHT ROAD

Lanes: Exist. 4 Prop. 6

Length: 2.47

TIP#: MCN60

Project: 322000 Type Work: Widening

Descp: SR 87/RIVERSIDE DR/MACON FM HALL RD TO

NORTHSIDE DR Lanes: Exist. 2 Prop. 5

Length: 2.40

TIP#: MCN-IS

Project: 322005. Type Work: Bridge Rehab Descp: SR 87/RIVERSIDE DR/MACON @ SABBATH CREEK

Lanes: Exist. 2 Prop. 4

Length: 0.50 TlP#: MCN-52

Project: 323015- Type Work: ATMS/ITS Descp: ATMS MAINTENANCE IN MACON FOR 2006

Length: 0.00 TIP#: MCN17
Project: 323030 Type Work: ATMS/ITS Descp: ATMS MAINTENANCE IN MACON FOR 2005

Length: 0.00
TlP#: MCN17
Project: 333055 Type Work: Intersection Improvement Descp: SR 87/MACON FM JOE TAMPLIN EXT TO &ALONG
WEAVER RD TO W.ELK Length: 1.80
TlP#: MCN69B

Phase Fund ROW NHS CST NHS

Year 2005 2007

Federal $1,510,400 $14,800,000

State $377,600 $3,700,000

Phase Fund

PE

NHS

ROW NHS

CST Bond

Year Underway
2006 After 2007

Phase PE ROW CST

Fund NHS NHS Bond

Year Underway
2007 After 2007

Phase Fund ROW 1M CST Bond

Year Underway
2006

Federal $35,520

State $8.880

Federal $206,400

State $51,600

Federal

State

$0 $55,000,000

Phase Fund

PE

NHS

ROW NHS

CST Bond

Year Underway
2006 2007

Phase Fund

PE

NHS

ROW NHS

CST Bond

Year Underway
2006 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway Underway
2006

Phase Fund

PE

Bridge

CST Bridge

Year Underway
2006

Federal

State

$2,463,200 $0

$615,800 $10,960.000

Federal $2,250,400

State $562,600

Federal

State

$5.600,000

$1,400.000

Federal $968,000

State $242,000

Phase Fund CST STP

Year 2006

Federal $160,000

State $40,000

Phase Fund CST STP

Year 2005

Federal $160,000

State $40.000

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL 2005

Federal
$0 $4.250,400

State
$0 $1,062,600

Other $0 $0

Total $1.888,000 $18,500.000

Other $0

Total $44,400

Other $0

Total $258,000

Other $0

Total $55.000,000

Other
$0 $0

Total
$3,079.000 $10,960,000

Other $0

Total $2.813,000

Other

Total

$0 Other
$0

$7,000.000 Total
$1.210,000

Other $0

Total $200,000

Other $0

Total $200,000

Other
$0 $0

Total
$0 $5,313,000

Page 41 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 27/2005

Bibb

Project: 333150. Type Work: Replace Bridge

Descp: SR 19/US 23 NBL & SBL @ WALNUT CREEK EAST

EDGE OF MACON

Length: 0.25

TIP#: MCN35

Project: 333152- Type Work: Replace Bridge

Descp: SR 87IUS 23 @ BEAVERDAM CREEK JUST NORTH

OF 1-75

Length: 0.30

TIP#: MCN38

Project: 350520. Type Work: Widening

Descp: FOREST HILL RD IN MACON FROM FORSYTH

ROAD TO WIMBISH ROAD

Lanes: Exist. 2 Prop. 4

Length: 0.75

TlP#: MCN22

Project: 351080- Type Work: Widening

Descp: JEFFERSONVILLE RD FM RECREATION RD TO

FALL LINE FWY/US 80 Lanes: Exist. 2 Prop. 4

Length: 1.20

TlP#: MCN28

Project: 351100- Type Work: Widening

Descp: CR 88/LOG CABIN DR FM SR 74/MERCER UNIV DR

TO HOLLINGSWORTH Lanes: Exist. 2 Prop. 4

Length: 0.90

TIP#: MCN26

Project: 351120- Type Work: Widening

Descp: BLOOMFIELD RD/LOG CABIN OR FM ROCKY CK

RD TO SR 221EI5ENHOWE

Lanes: EXist. 2 Prop. 4

Length: 2.04

TlP#: MCN-31

Project: 351130- Type Work: Widening

Descp: CR 723/FOREST HILL RD FM WIMBISH RD TO

NORTHSIDE DRICR 79 Lanes: Exist. 2 Prop. 3

Length: 1.80

TlP#: MCN-25

Project: 351135. Type Work: Replace Bridge

Descp: CR 723/FOREST HILL ROAD@SABBATH CREEK

NORTH OF SR 19 Lanes: Exist. 2 Prop. 3

Length: 0.20

TlP#: MCN-59

Project: 351140. Type Work: Widening Descp: NW PKWYNEW LOC FM LOG CABIN TO

NAPIER@PARK5TTHENTOSR 19

Lanes: Exist. 2 Prop. 4

Length: 2.10

TlP#: MCN-29

Project: 371774. Type Work: Bicycle/Ped. Facility Descp: OCMULGEE HERITAGE GREENWAY IN MACON

LUMP SUM PROJECT

Length: 1.00 TIP#: TEAI

Project: M002784 Type Work: Bridges Descp: 1-75 @ 6 LOCATIONS IN BIBB COUNTY DECK
REHAB Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2007 After 2007 After 2007
Year Underway
2005 2007

Federal $20,000

State $5,000

Federal
$10,400 $880,000

State
$2,600 $220,000

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2006

Federal
$471,200 $3,070,400

State
$117,800 $767,600

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Federal $1,762,400

State $440,600

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Federal $4,077,600

State $1,019,400

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2005

Federal

State

$5,444,000

$1,361,000

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2007

Federal
$40,000 $3,773,600

State
$10,000 $943,400

Phase Fund ROW STP CST Bridge

Year 2005 2007

Federal $40,000
$186,400

State $10,000 $46,600

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Federal $2,874,400

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Federal $0 $0
$800,000

Phase Fund

PE

1M

CST 1M

Year LUMP LUMP

Federal $202,500 $2,025,000

State
$718,600
State $0 $0 $0
State $22,500 $225,000

Other $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other
$0
Other $0 $0
Other $0 $0
Other $0
Other $0 $0
$200,000
Other $0 $0

Total $25,000
Total $13,000
$1,100,000 Total $589,000
$3,838,000 Total
$2,203,000
Total $5,097,000
Total
$6,805,000 Total $50,000
$4,717,000 Total $50,000 $233,000
Total $3,593,000
Total $0 $0
$1,000,000 Total $225,000
$2,250,000
Page 42 of 300





STATE TRANSPORTA TlON IMPROVEMENT PROGRAM ZmZQQ5

Bibb
Project: TOO0658 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 OPERATING FOR MACON
Length: 0.00 TIP#:
Project: TOO0659 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR MACON
Length: 0.00 TIP#:
Project: TOO0660 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR MACON
Length: 0.00 TIP#:
Project: TOO0661 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR MACON
Length: 0.00 T1P#:
Project: TOO0678 Type Work: Transit Projects Descp: FY 2005 SECTION 3037 ACCESS TO JOBS MACON
Length: 0.00 TIP#:
Project: TOO0909 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 OPERATING FOR MACON
Length: 0.00 TIP#:
Project: TOO0910 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR MACON
Length: 0.00 T1P#:
Project: TOO0911 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR MACON
Length: 0.00 T1P#:
Project: TOO0912 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR MACON
Length: 0.00 TIP#:
Project: TOO0943 Type Work: Transit Projects Descp: FY 2006 SECTION 3037 ACCESS TO JOBS MACON
Length: 0.00 T1P#:
Project: T001238 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 OPERATING FOR MACON
Length: 0.00 T1P#:

Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit

Year 2005
Year 2005
Year 2005
Year 2005
Year 2005
Year 2006
Year 2006
Year 2006
Year 2006
Year 2006
Year 2007

Federal $1,335,076

State $0

Other $1,335,076

Federal $644,650

State $80,581

Other $80.581

Federal $228,000

State $28.500

Other $28,500

Federal $57,202

State $14,300

Other $0

Federal $583,885

State $0

Other $583,885

Federal $1,361,778

State $0

Other $1,361,778

Federal $624,650

State $78,081

Other $78,081

Federal $228,000

State $28,500

Other $28.500

Federal $60,062

State $15,016

Other $0

Federal $0

State $0

Other $0

Federal $1,389,013

State $0

Other $1,389,013

Total $2,670.152
Total $805,812
Total $285.000
Total $71,502
Total $1.167,770
Total $2,723.555
Total $780,812
Total $285,000
Total $75.078
Total $0
Total $2.778.026

Page 43 of 300

STA TE TRA NSPOR TA TlON IMPROVEMENT PROGRAM 21712005

Bibb
Project: T001239 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR MACON
Length: 0.00 TlP#:
Project: T001240 Type Work: Transit Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR MACON
Length: 0.00 TIP#:
Project: T001241 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR MACON
Length: 0.00 TIP#:
Project: T001252 Type Work: Transit Projects Descp: FY 2007 SECTION 3037 ACCESS TO JOBS MACON
Length: 0.00 TlP#:
Project: T001280 Type Work: Transit Projects Descp: Macon Mullimodal Terminal Station
Length: 0.00 TlP#:
Project: T001281 Type Work: Transit Projects Descp: Macon Mullimodal Terminal Station Root Rehab.
Length: 0.00 TlP#:
Project: T001282 Type Work: Transit Projects Descp: Macon Altemative Fuel Vehicle Purchase
Length: 0.00 TIP#:

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Federal $644.650

State $80.581

Federal $228.000

State $28.500

Federal $63.065

State $15.766

Federal $0

State $0

Federal $3.460.633

State $0

Federal $265.603

State $0

Federal $235.742

State $0

Other $80.581
Other $28.500
Other $0
Other $0
Other $865.158
Other $66,400
Other $58.936

Total
$805.812
Total
$285.000
Total
$78.831
Total
$0
Total
$4.325.791 Total
$332.003
Total
$294.678
Page 44 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Sleckley

Project: 0001237 Type Work: Intersection Improvement

Descp: SR 67/US 23 AT CR 220/FRANK COOK ROAD EAST

OF COCHRAN

Length: 0.77

LUMP SUM PROJECT

TIP#:

Project: 0003904 Type Work: Intersection Improvement Descp: SR 67IUS 23 @ SR 26

LUMP SUM PROJECT

Length: 0.49 TlP#:

Project: 245336. Type Work: Replace Bridge

Descp: SR 126 @GUM SWAMP CREEK 5.6 MI E OF

COCHRAN

Length: 0.26

TlP#:

Phase Fund

PE

STP

ROW Local

CST STP

Year Undeoway
LOCL LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Undeoway
LUMP LUMP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 After 2007

Federal $0
$750,600
Federal $125,100 $1,350,000
Federal $16,000

State $0
$63,400
State $13,900 $150,000
State $4,000

Other $300,000
$0
Other $0 $0
Other $0

Total $300,000 $634,000
Total $139,000 $1,500,000
Total $20,000

Page 45 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2at2QQ5

Brantley

Project: 0006455 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN

DISTRICT 5

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006468 Type Work: Bridge Replacement Descp: CR 50 OVER BUFFALO CREEK

Length: 0.40 TIP#:

Project: 533158. Type Work: Replace Bridge

Descp: SR 15@ DIX BRANCH IN CITY LIMITS OF

HOBOKEN

Length: 0.39

TlP#:

Project: 533159. Type Work: Replace Bridge

Descp: SR 23/US 301 @ BUFFALO CREEK 1 MI NORTH OF

HICKOX

Length: 1.04

TIP#:

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $280,000

State $70,000

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year 2006 LOCL After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Federal $104,800
$0
Federal
$896,000 Federal
$1,963,200

State $26,200
$0
State
$224.000 State
$490,800

Other $0
Other $0
$50,000
Other
$0 Other
$0

Total $350,000
Total
$131,000
$50.000
Total $1.120,000
Total $2.454,000 Page 46 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
zmzOO5

Brooks

Project: 431170- Type Work: Replace Bridge

Descp: CR 305 @ CSX RAILROAD APPROX. 7 MILES W OF

QUITMAN GA

Length: 0.51

TIP#:

Project: 431900- Type Work: Replace Bridge

Descp: CR 305 BRIDGE REPLACEMENT APPROX 2 MILES

WEST OF QUITMAN

Length: 0.38

TIP#:

Project: 432150- Type Work: Replace Bridge Descp: SR 122 @ MEETINGHOUSE CK & LITTLE RIVER
BROOKS-LOWNDES CO LN Length: 1.09
TIP#:

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2007

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2006

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006

Federal
$0 $465,600

State
$0 $116,400

Federal
$0 $900,800

State
$0 $225,200

Federal
$37,600 $5,304,800

State
$9,400 $1,326,200

Other $0 $0
Other $10,000
$0
Other $0 $0

Total $0
$582,000
Total $10,000 $1,126,000
Total $47,000 $6,631,000

Page 47 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
zaJ2QQ5

Bryan

Project: 0002201

Type Work: Lighting

Descp: 195 @ SR 144 INTERCHANGE LIGHTING

LUMP SUM PROJECT

Length: 0.40 TIP#:

Project: 0006298 Type Work: Guardrail
Descp: 1-95@SEV LOCS GUARDRAIL REPLACEMENT IN
CAMDENIBRYANICHATHAM Length: 20.02

LUMP SUM PROJECT

TlP#:

Project: 0006456 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN

BRYAN/CHATHAM

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006941

Type Work: Special Studies

Descp: 1-95 @ CR 9/BELFAST SIDING ROAD IJR STUDY

LUMP SUM PROJECT

Length: 0.40 TlP#:

Project: 532600. Type Work: Passing Lanes

Descp: SR 144 PASSING LANES THROUGH FT

STEWART/BRYAN.L1BERTY

Lanes: Exist. 2 Prop. 3

Length: 5.01

TIP#:

Phase Fund CST NHS

Year LUMP

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund

PE

40450

Year LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Federal $160,000

State $40,000

Federal $292,500

State $32,500

Federat $336,000

State $84,000

Federal $0

State $100,000

Federal $763,200

State $190,800

Other $0
Other $0
Other $0
Other $0
Other $0

Total
$200,000
Total
$325,000
Total
$420,000
Total
$100,000
Total
$954,000
Page 48 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005

BUlloch

Project: 0003091 Type Work: Replace Bridge Descp: CR 153/CYPRESS LAKE RD@WATERINGHOLE
BRANCH 5MI SW/STATESBORO
Length: OAO
TlP#:

Project: 0003092 Type Work: Replace Bridge

Descp: CR 577/FAS 733 @ LOWER BLACK CREEK 6 MI S

OF BROOKLET

Length: 0.20

TIP#:

Project: 0005829 Type Work: Widening

Descp: SR 26/US 80 FM 5LN @ CR 491 TO CR 423/0LD

LEE FIELD RD Lanes: Exist. 2 Prop. 4

Length: 3.10

TlP#:

Project: 0006091 Type Work: Railroad Crossing Descp: CS 656/EAST JONES AVENUE @ NS #620196H

LUMP SUM PROJECT

Lenglh: 0.20 TlP#:

Project: 0006631 Type Work: Streetscapes
Descp: STATESBORO DOWNTOWN STREETSCAPE ENHANCEMENT-PHASE I Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006632 Type Work: Multi-use Trail Descp: S & S GREENWAY

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 521970- Type Work: Widening

Descp: SR 26/STATESBORO FM SR 67173/US 301 TO

BRANNEN ST/CS 802

Lanes: Exist. 4 Prop. 5

Length: 1.87

TlP#:

Project: 522460- Type Work: Widening Descp: SR 67 FM 1-16TO STATESBORO BYP

Lanes: Exist. 2 Prop. 4

Length: 10.85 TIP#:

Project: 522640- Type Work: Widening

Descp: E. STATESBORO BYP/SR 1018 FROM SR 73/US 25

TO SR 73/US 301

Lanes: Exist. 2 Prop. 4

Length: 6.85

TlP#:

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2005

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2006

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Phase Fund CST STP

Year LUMP

Federal $0
$819,200
Federal $0
$597,600
Federal $2,400,000
Federal $170,000

State $0
$204,800
State $0
$149,400
State $600,000
State $0

Phase Fund CST STP

Year LUMP

Federal $530,400

State $0

Phase Fund CST STP

Year LUMP

Federal $528,800

State $0

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Federal $323,200

State $80,800

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Federal $3,332,800

State $833,200

Phase Fund PE STP ROW STP CST STP

Year Underway Underway
2006

Federal

State

$6,560,000

$1,640,000

Other $10.000
$0 Other $5.500
$0 Other
$0
Other $0
Other $132,600
Other $132,200
Other $0
Other $0
Other
$0

Total $10,000 $1.024,000 Total
$5,500 $747,000 Total $3,000,000
Total $170,000
Total $663,000
Total $661.000
Total $404.000
Total $4,166.000
Total $8,200,000

Page 49 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2flI2QQ5

Burke
Project: 0006633 Type Work: Mulli-use Trail Descp: WAYNESBORO GREENWAY TRAIL

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 222480- Type Work: Widening

Descp: SR 121/US 25 SAVANNAH RIVER PKY FM CR

118/354 TO SR 24 @ BYP

Lanes: Exist. 2 Prop. 4

Length: 8.43

TlP#:

Project: 231260- Type Work: Passing Lanes

Descp: SR 24 PASSING LNS @ 4 LOC BET

WAYNESBORO&LOU'VILLEIJEFFERSON

Lanes: Exist. 2 Prop. 3

Length: 5.28

TIP#:

Project: 231960- Type Work: Replace Bridge Descp: SR 56 (3) BRIDGES OVER OGEECHEE RVR &
OVFL NE OF SUMMERTOWN Length: 0.82
TlP#:

Phase Fund CST STP

Year LUMP

Federal $650,400

State $0

Phase Fund PE State ROW Bond CST EARMK CST Bond

Phase PE ROW CST

Fund STP STP STP

Year Underway Underway
2005 2005
Year Underway
2005 2006

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 After 2007

Federal

State

$1,000,000 $0
Federal

$0 $16,631,000
State

$436,000 $1,995,200

$109,000 $498,800

Federal $40,000

State $10,000

Other $162,600
Other
$0 $0 Other $0 $0
Other $0

Total
$813,000
Total
$1.000,000
$16.631,000
Total
$545,000
$2,494.000
Total
$50,000
Page 50 of 300

,;
t
t~
, I)
4
\
.~
t\
"~ J .\
t;
~)
fl
.,'

"
.: 'J
..t'';;
.'t',\\
tj
t
....t\'\''

STATE TRANSPORTATION IMPROVEMENT PROG~AM 2!712QQ5

Butts
Project: 0000523 Type Work: Interchange Descp: 1-75AT SR 16/ARTHUR BOLTON PKWY

Lanes: Exist. 2 Prop. 4

Length: 1.10 TIP#:

Project: 0000760 Type Work: Widening Descp: SR 16 WIDEN FM 1-75TO CITY OF JACKSON

Lanes: Exist. 2 Prop. 4

Length: 7.36 TIP#:

Project: 0004147 Type Work: Intersection Improvement
Descp: SR 36 AT CR 43IKEYS FERRY RD; CR 289!BARNETTS BR & CR 265 Length: 0.68

LUMP SUM PROJECT

TIP#:

Project: 0006641 Type Work: Historic Facilities Descp: INDIAN SPRING HOTEL - PHASE 111

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 321800- Type Work: Bridge Rehab Descp: SR 16 OR SR 36 IN JACKSON @ SOUTHERN RR

Length: 0.40 TlP#:
Project: 322440. Type Work: Widening Descp: SR 36/JACKSON FM SR 16 TO CR 289/STARK RD

Lanes: Exist. 2 Prop. 4

Length: 0.63 TIP#:

Project: 332510.

Type Work: Replace Bridge

Descp: SR 16 OVER OCMULGEE RIVER AT JASPER

CL(M.L.17.45)

Length: 1.17

TlP#:

Project: 332520 Type Work: Widening

Descp: SR 16/ARTHUR BOLTON FM REHOBOTH

RD/SPALDING TO 1-75/BUTTS

Lanes: Exist. 2 Prop. 4

Length: 7.64

TIP#: SP-020

Project: 333170 Type Work: Replace Bridge

Descp: SR 36 @ TOWALIGA RIVER 7.5 MI SW OF

JACKSON

Length: 0.23

TlP#:

Project: 333171- Type Work: Replace Bridge

Descp: SR 36 @YELLOWWATER CREEK 1 MI N OF JCT

SR42

Length: 0.21

TIP#:

Project: 333172- Type Work: Replace Bridge

Descp: SR 36@SOUTH RIVER AT BUTTS-NEWTON CO

LINE

Length: 0.40

TIP#:

Phase Fund ROW 1M CST Bond

Year Underway
2005

Federal $0

State $6,490.000

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Federal $4.000.000

State $1.000.000

Phase Fund ROW Local CST STP

Year LOCL LUMP

Federal $0
$495,900

State $0
$55,100

Phase Fund CST STP

Year LUMP

Federal $280,000

State $0

Phase Fund ROW State CST State

Year 2007 After 2007

Federal $0

State $4,080.000

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Federal $89,600

State $22,400

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2005

Federal $3.628.800

State $907,200

Phase Fund

PE

STP

ROW STP

CST STP

CST STP

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway
2005 2005
Year Underway
2005 2007

Federal
$670,332 $17,448,000
Federal
$12.000 $880,000

State
$167.583 $4.362.000
State $3.000
$220.000

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2007 After 2007

Federal $12,000

State $3.000

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 After 2007

Federal $12.000

State $3,000

Other $0
Other $0
Other $207,200
$0
Other $70,000
Other $0
Other $0
Other
$0 Other
$0 $0 Other $0 $0 Other $0
Other $0

Total $6.490.000
Total $5.000.000
Total $207,200 $551,000
Total $350,000
Total $4.080.000
Total $112,000
Total
$4,536,000 Total
$837,915 $21,810,000
Total $15.000 $1,100.000 Total $15,000
Total $15,000

Page 51 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2at2QQ5

Butts

Project: MOO1004 TYPEl Work: Bridges

Descp: BRIDGE JACKING@ SEV LOCS IN

BUnSISPALDINGIHENRY COUNTIES

Lanes: Exist.

Prop

Length: 1,60

LUMP SUM PROJECT

TlP#' AR-JII

Project MOO2715 Ty~. W!lfk: Bridges

Descp: 1-75 @ CABIN CREEK IN BUTTS & $R 20 IN HENRY

DECK REHAB

Length: 0.80

LUMP SUM PROJECT

ne

Phase Fund
PE NHS
CST NHS

Year Undero.vay
LUMP

Federal $1,200.000

St.te $300,000

Pha$8 Fund
PE 1M
CST 1M

Y. .,
LUMP LUMP

Federal $90,000
$900,000

State $10,000 $100,000

Other $0
Other $0 $0

Total
$1,500,000
To,.,
$100.000 $1.000.000

Page 52 of 300

---------

STATE TRANSPORTATION IMPROVEMENT PROGRAM
ZaJZQQ5

Calhoun
Project: "2950- Type Work' Replace Bridge Oescp: SR 216 @ LITTLE PACHITlA CREEK 1 MI N OF
EDISON Lenr/th: 0.44
TIP#. 'J'J-Ii.04

Project: A42951.

Type Work: Replace Bridge

Descp: SR 234 @ CHICKASAWHATCHEE CREEK 8 MI NE

OF LEARY

Length: 1.34

TIP#:

Phase Fund PE Bridge ROW Bridge CST Bridge CST STP

Phas9 Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

V..,
Underway Underway
2005 2005
V..,
UndelWsy 2005 2006 2006

Federal
$432.800 $702,400 Federal
$30,400 $858,400 $1.328.000

Stille
$108,200 $175,600 State
$7,600 $214,600 $332,000

Other
$0 $0 Other
$0 $0 $0

Torat
$541.000 $878,000
Tora,
$38,000 $1,073,000 $1.660,000

'-

"-..

Page 53 of 300

STA TE TRANSPORTATION IMPROVEMENT PROGRAM 20/2005

Camden

Project: 0000889 Type Work: Rest Area

Descp: 1-95 RECONSTRUCTION OF THE NORTH BOUND

WELCOM~ CE.NTER

Length: 0.40

TlP#:

Project: 0002801 Type Work: Interchange Descp: SR 40 ADD LEFT TURN STORAGE LANE AT 1-95
INTERCHANGE Length: 1.30
TfP#.-

Project: 00051$7 Type Work: Railroad Crossing Descp: CR 200/lAKES BLVD AT 8M #OOOO36C

LUMP SUM PROJECT

Length" 0.00 T/Pn:

Project: 0006291 Typo Work: Guardrail Descp: 1.95@SEV LOCS GUARDRAIL REPLACEMENT IN
CAMDENIBRYANICHATHAM Length: 20.02

LUMP SUM PROJECT

tu.

P~ct: 0006455

Type Worlc Signals

Oescp: UPGRADE TRAFFIC SIGNALS @VARIOUS LOC IN

DIST~ICT 5

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006701 Type Work' Po...emcnt Rehab Desep: ST MARY'S ROAD PAVING PROJECT

Length" 0.00 TlP#:

Project: 522080.

Type Work: Widening

Descp: SR 40 FM WieR 61 TO SR 25/US 17

Lanes: Exist. 2 Prop. 4

Length: 3,50 TIP#:

Phase
PE
ROW
CST

Fund
1M 1M 1M

Year Underway
2006 After 2007

Phase Fund
PE NHS CST NHS

Y.., 2007
Aft13r2007

Federal $152,100
Federal 5120,000

State $16,900
State $30,000

Phase Fund
CST STP

Year LUMP

Federal $175,000

State $0

Phase Fund
PE STP CST STP

Y..,
Underway LUMP

Federal $292,500

Scare $32,500

Phase Fund
PE STP CST STP

Ye"
Underway LUMP

Federal $280,000

Slalti' $70,000

Phase Fund
CST H170

Year 2005

Federal $100,000

S'.'v SO

Phllse Fund
PE STP ROW STP CST STP

Y..,
Underway
2007
After 2007

Fed&flJ1
~80,OOO

Stale $120,000

Other $0
Other $0
Other
$0
Other
SO
Other
$0
Other
$0
Other
SO

Tor.I $169,000
Toml $150,000
Toy/ $175.000
Tota' $325,000
TDr.1 $350,000
To~1
$100,000
Total
5600,000

Page 54 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
Za12QQ5

Candler

PfOjecl: 0OO284t Type Work' Replace Bridge
Descp: CR 223/ PORTAL HIGHWAY@lITTLE STOCKING HEAD CREEK Length: 0,63
TlP#.-

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
lQCL 2006

Federa'
$0 S181,600

Stat.
$0 $45,400

Other
$10,OQO
SO

Totll
$'0.000
$227,000

Project: 0002'42 Type Work: Replace Bridge DescP_" CR 2231PORTAL HIGHWAY @ BIG BRANCH B MI
NORTH OF M~TTE~ Length: 0.76
TlP#:
Project: OOO2t43 fype WQric: Replace Bridge Descp: CR 223/ PORTAL HIGHWAY@LOTTS CREEK 9 MI
NORTH OF METTER Length: 0.20
T1P#:

Phase Fund PE Bridge ROW Local CST Bridge

Y. .,
uncerwey LOCL 2006

Phase Fund PE Bridge ROW Local CST Bridge

Yellr Underway
LOCL 2006

Federal
$0 $213,800
Federal
$0 $458,000

State
So
$53.400
State
$0 $114,000

Other
$10,000
SO
Other
$10.000
So

Toy'
$10.000 $267.000
To,.,
$10.000 $570,000

.....

Project: 542400- Type Work: Replace Bridge

Descp: SR 46@ FIFTEEN MILE CREEK 2.8 Ml E. OF

l.

METTER

Leflglh: 076

L

TlP#.-

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Federal $2,359,200

State $589,800

OtheT $0

Tot.t
$2,949,000

L

Project: 542401- Type Work: Replace eridge

Phase Fund

Vea,

Federal

State

Other

Total

l.

Descp: SR 129@CANOOCHEERIVER&OVERFlOW4MI SOF METTER

PE Bridge ROW Bridge

Underway Underway

l.

Leflglh: 0.31 TlP#:

CST 6ridge

2005

$2,052.800

$513,200

$0

$2,566.000

l

l

l.

L
e

l. L L
~
L l. l. L

l.

l.-
I...

~

Page 55 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Carroll
Project: 0000758 Type Work: Realignment Descp: SR 113 RELOCATION IN THE CITY OF TEMPLE

Length: 0,20 TlP#:

Project: 0001357 Type Work: Replace Bridge

Descp: SR 16/US 27 ALT@CHATTAHOOCHEERIVERAT

COWETA CO LINE

Length: 1,20

TlP#: CW-035

Project: 0002281 Type Work: Historic Facilities

Descp: CARROLLTON HISTORIC DEPOT VISITOR'S

CENTER

Length: 0,00

LUMP SUM PROJECT

TIP#:

Project: 0004047 Type Work: Intersection Improvement

Descp: SR 166 AT NORTH AND WEST JONESVILLE

ROADS/CR 98/124

Length: 0,62

LUMP SUM PROJECT

TIP#:

Project: 0004730 Type Work: Intersection Improvement

Descp: SR 8/US 78 @ CR 644/ROCKY BRANCH RD AND

CS 80411N1LLA TRACE

Length: 0,34

LUMP SUM PROJECT

TIP#:

Project: 0006026 Type Work: Intersection Improvement Descp: SR 5 @ SR 16/US 27 ALT

LUMP SUM PROJECT

Length: 0.40 TlP#:

Project: 631490- Type Work: New Construction

Descp: VILLA RICA BYP EXTEND W,FM PROPOSED SR 61

BYPASS TO SR 101 Lanes: Exist. 0 Prop, 2

Length: 1.40

TlP#:

Project: 641910. Type Work: Passing Lanes

Descp: SR 100 NB MP 5,5-6,8; NB MP 13,3-14,55; SB MP

15,3-16,8

Lanes: Exist. 2 Prop, 3

Length: 4,05

TIP#:

Project: 642310. Type Work: Replace Bridge Descp: CR 829/CLEM-LOWELL RD @ WHOOPING CREEK
SOUTH OF CARROLLTON Length: 0,30
TIP#:

Project: 850620- Type Work: Miscellaneous Improvement Descp: SR 16/CARROLLTON FM COLUMBIA RD TO SR 1
DRAINAGE IMPROVMENTS Length: 1,10
TlP#:

Project: M002966 Type Work: Guardrail Descp: 1-20 FROM ALABAMA STATE LINE TO SR 1/US 27

LUMP SUM PROJECT

Length: 24,00 TlP#:

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund CST STP

Phase Fund

PE

STP

ROW Local

CST STP

Phase Fund

PE

STP

ROW Local

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

NHS

CST NHS

Year Underway
2007 2007
Year Underway
2005 2006
Year LUMP
Year Underway
LOCL LUMP
Year Underway
LOCL LUMP
Year LUMP LUMP LUMP
Year Underway
2007 After 2007
Year Underway Underway
2005
Year Underway
LOCL 2005
Year Underway
2007 After 2007
Year LUMP LUMP

Federal $160,000 $200,000
Federal $40,000
$2,556,000
Federal $600,000
Federal $0
$345,600
Federal $0
$188,100
Federal $77,400
$171,000 $894,600
Federal $502,400
Federal
$2,727,180
Federal $0
$676,000
Federal $1,336,800
Federal $1,600,000 $26,400,000

State $40,000 $50,000
State $10,000 $639,000
State $0
State $0
$38,400
State $0
$20,900
State $8,600
$19,000 $99,400
State $125,600
State
$681,795
State $0
$169,000
State $334,200
State $400,000 $6,600,000

Other $0 $0
Other $0 $0
Other $150,000 '
Other $832,000
$0
Other $639,600
$0
Other $0 $0 $0
Other $0
Other
$0
Other $10,000
$0
Other $0
Other $0 $0

...

Total $200,000 $250,000
Total $50,000 $3,195,000
Total 5750,000
Total 5832,000 5384,000
Total 5639,600 5209,000
Total $86,000 5190,000 5994,000
Total 5628,000
Total

..-:

$3,408,975 Total $10,000 $845,000 Total
$1,671,000
Total $2,000,000 533,000,000
Page 56 of 300

..

.;
t
t1

.'.1 .'t'..,'
.:'
.1
....t.....o.''''''''o

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aIZQQ5

Catoosa

Project: 0001418 Type Work: Intersection Improvement

Descp: SR 21BATTLEFIELD PARKWAY AT PINE GROVE

ROAD/CR6

Length: 0.36

LUMP SUM PROJECT

TIP#: 021-2

Project: 0001577 Type Work: Turn Lanes

Descp: SR 2 MEDIAN TURN LANES FROM FORT

OGLETHORPE TO 1-75

Length: 4.39

TIP#: GA-0203

Project: 0003948 Type Work: Intersection Improvement Descp: SR 31US41 AT GRAYSVILLE ROADICR 381

LUMP SUM PROJECT

Length: 0.41 TlP#: 021-3

Project: 0006609 Type Work: Wildlife mortality mitigation Descp: DEERVEHICLE COLLISION REDUCTION PROJECT

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 611210- Type Work: Interchange Descp: 1-75AT SR 1461CLOUD SPRINGS ROAD

Length: 0.59 TIP#: GA-OI

Project: 621530. Type Work: Widening

Descp: SR 151 FM ROLLINS IND PKlHOLCOMB RD TO US

41 @ RINGGOLD Lanes: Exist. 2 Prop. 4

Length: 2.03

TlP#: STP-98-2

Project: 631420- Type Work: Turn Lanes

Descp: SR2ISR 31US 41 AT SPARKS STREET IN

RINGGOLD Lanes: Exist. 2 Prop. 3

Length: 0.13

LUMP SUM PROJECT

TIP#: 035-1

Project: 631505- Type Work: Replace Bridge Descp: SR 2/US 41 @SOUTH CHICKAMAUGA CREEK IN
WEST RINGGOLD Length: 0.40
TlP#: BHF-99-4

Project: 632885- Type Work: Replace Bridge

Descp: SR 31US41 @TIGERCREEK 1.9 MI EAST OF

RINGGOLD

Length: 0.24

TIP#:

Project: 642190 Type Work: Widening

Descp: SR 151/00LTEWAH-RINGGOLD HWY FM US 41 NO

TO TENN STATE LINE Lanes: Exisl. 2 Prop. 4

Length: 5.19

TIP#: STP-98

Project: 642210. Type Work: Widening

Descp: SR 1461CLOUD SPGS RD FM \75 NORTH TO SR

31US41 Lanes: Exisl. 2

Prop. 4

Length: 0.51

TlP#: STP-98(3)

Phase PE ROW CST

Fund STP Local STP

Phase Fund PE STP CST STP

Phase Fund

PE

STP

ROW Local

CST STP

Phase Fund CST STP

Phase Fund PE NHS ROW NHS CST Bond

Phase Fund PE 33E PE STP ROW STP ROW STP CST STP CST STP Phase Fund PE STP ROW STP ROW STP CST STP
Phase Fund PE Bridge ROW Bridge CST Bridge

Phase PE ROW CST

Fund Bridge Bridge Bridge

Phase PE ROW CST

Fund STP STP STP

Phase Fund PE 061 ROW STP CST STP

Year Underway
LOCL LUMP
Year Underway
2006
Year Underway
LOCL LUMP
Year LUMP
Year Underway
2005 2006
Year Underway Underway
2005 2005 After 2007 After 2007 Year Underway Underway Underway LUMP Year Underway 2006 After 2007
Year Underway
2006 After 2007
Year 2006 After 2007 After 2007
Year Underway
2005 2006

Federal $0
$215.100
Federal $3.260.000

State $0
$23.900
State $815.000

Federal
$0 $380.700
Federal $85,600

State
$0 $42,300
State $0

Federal
$450.400 $0

State
$112,600 $8,042,362

Federal

State

$2,469.600 $1,700.800

$617.400 $425,200

Federal

State

$401.400 Federal $108,000

$44,600 State $27,000

Federal $12,000

State $3.000

Federal $416.000

State $104,000

Federal
$1,273.600 $2.777,600

State
$318,400 $694,400

Other $0 $0
Other $0

Total $0
$239.000
Total $4.075.000

Other
$15.300 $0
Other $21,400

Total
$15.300 $423,000
Total $107,000

Other $0 $0
Other

Total $563.000 $8,042,362
Total

$0

$3,087,000

$0

$2,126,000

Other

Total

$0 Other
$0

$446,000 Total $135,000

Other $0

Total $15,000

Other $0

Total $520,000

Other
$0 $0

Total
$1,592.000 $3,472.000

Page 57 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Catoosa

Project: 642220-

Type Work.- Widening

Descp: SR 1461CLQUO SPR RD FM SR 1/US 27 EAST TO

LAKEVIEW RateR 553
Lanes: exist. 2 Prop. 4

Length: 2_20

TlP#: STP9S(4)

Project 641140-

Type Work; W~Il\llg

Descp: SR 3!US 41 FM SR 151 NORTHWESTLV TO SR 146

Lanes: Exist. 2 Prop. 4

Length" 7.21 TlP#: S.Tp.98t6j

Proj9Ct: 850430. Type Work: Widening

Descp: SR 3/US 41 FM SOUTH OF HIGHLAND RDfCH 40

TO FRAWLEY ROITENN

Lanes:Exfst. 2 Prop. 4

Length: 1.45

TlP#' STP99-1

Project: 8$0440. Type Work' Widening

DeSCp: SR 146/CLOUD SPGS RD FM LAKEVIEW DR TO

1-75& BRIDGE

Lanes:EXist, 2 Prop. 4

t.ength: 2.34

TlP#: STP99-2

Project: M00271D Type Work: Bridges Descp: 1-75@ 8 lOCATIONS IN CATOOSA DECK REHAB

LUMP SUM PROJECT

L.ength: 0.00 TlPU:

Phase Fund PE STP ROW STP CST STP

Year Underway
2006 After 2007

Federal $6,696,800

State
$1,674,200

Phase funrJ PE STP ROW STP ROW STP ROW STP CST STP Phase Fund PE STP ROW STP CST STP

Year Underway
2006 After 2007 After 2007 After 2007
Yea,
Underway Underway
2005

Federal $9,248,800

State $2.312.200

Fed.,.1

State

$2,922,400

$730,600

Phase Fund PE STP ROW STP ROW Qra CST STP
Phue Fcmd PE 1M CST 1M

Yea'
Underway Underway Underway
2006
Yea'
l,.UMP l,.UMP

Fed.,.1

State

57,520,000
Federal $225,000 12,250,000

$1.680,000
State $25,000 $250,000

Other $0

Total $8,371.000

Other $0

Tota'
$11,561,000

Other

ro~1

$0 Other

$3,653,000 Toto'

$0
0 ....$0 $0

$9,400,000
Toto' $250,000 $2,500,000

Page 58 of 300

STATE TRANSPORTATlON IMPROVEMENT PROGRAM
2a!2QQ5

Charlum

Project: (1002110 Type Work Rephu:e Bridg@

Descp: cR 3@ SPARKMANCREEK 11 MI SOUTH OF ST.

G~ORGE

Lenglh: 0.40

TlP#:

Phase Furtd PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2005

Fedvr.J1
$0 $504,000

State
$0 $126,000

Other
$7,000 $0

Totlll
$7.000 $630,000

Project: 0008531 Type Work: Streetscaoes
~
Descp: DOWNTOWN CENTER CITY OF FOLKSTON

PHASE"

Length: 0.00

~

LUMP SuM PROJECT

-

TIP#:

Phase Fund CST STP

Year LUMP

Fede,.., $450,400

State $0

Other $112,600

Tote' $563,000

'-

'-

'-
I...

\-
\...
\...
l. I... l.
\... I... I... I...
l. I...
'-
l. ',-

'....

'-
'c.

Page59 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Chatham

Project: 0000529 Type Work: Lighting

Descp: 1-95@ SR 21/AUGUSTA ROAD INTERCHANGE-

LIGHTING

Length: 0.40

LUMP SUM PROJECT

TIP#:

Project: 0000690 Type Work: Rest Area

Descp: 1-95 RECONSTRUCTION OF THE SOUTH BOUND

WELCOME CENTER

Length: 0.46

TlP#: 2001-H-02

Project: 0001894 Type Work: Intersection Improvement Descp: SR 26/US 80 @ CS 503/3RD STREET

LUMP SUM PROJECT

Length: 0.20 TlP#:

Project: 0002140 Type Work: Widening Descp: SR 307IDEAN FOREST ROAD FM US 17 TO 1-16

Lanes: Exist. 2 Prop. 4

Length: 2.50 TIP#: 2002-H-06

Project: 0002267 Type Work: Miscellaneous Improvement
Descp: SAVANNAH-OGEECHEE CANAL CORRIDOR PHASES 1 & II; DSGN & CON Length: 0.00

LUMP SUM PROJECT

TIP#: 2002-H-30

Project: 0002921 Type Work: New Construction

Descp: HARRY S.TRUMAN PKY FM ABERCORN TO

WHITFIELD - PHASE V Lanes: Exist. 0 Prop. 4

Length: 0.77

TlP#: 90-H-2

Project: 0003371 Type Work: Railroad Crossing

Descp: CR 654ITREMONT RD IN SAVANNAH @ CSX #

641177L

Length: 0.40

LUMP SUM PROJECT

TIP#: 2002-H-25

Project: 0003803 Type Work: Miscellaneous Improvement
Descp: PE FOR SECURITY SYSTEMS ON TALMADGE & SIDNEY LANIER BRIDGES Length: 35.45

LUMP SUM PROJECT

TIP#: BATS-MSL

Project: 0004046 Type Work: Intersection Improvement
Descp: SR 307/DEAN FOREST ROAD AT OLD LOUISVILLE ROADIeS 568 Length: 0.23

LUMP SUM PROJECT

TlP#: 94-H-40

Project: 0004916 Type Work: Lighting
Descp: 1-516 @ BAY STREET INTERCHANGE - LIGHTING UPGRADE Length: 0.40

LUMP SUM PROJECT

TlP#:

Project: 0005822 Type Work: Interchange Descp: 1-95 AT CR 23iPINE BARREN ROAD

Lanes: Exist. 0 Prop. 4

Length: 0.40 TIP#: 2003-H-OI

Phase Fund CST NHS

Phase Fund

PE

1M

ROW 1M

CST 1M

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW Local

CST STP

Phase Fund CST 'STP

Phase Fund PE NHS ROW NHS CST NHS
Phase Fund CST STP

Phase Fund

PE

NHS

Phase Fund PE STP ROW Local CST STP
Phase Fund CST NHS

Phase Fund PE NHS ROW H170 ROW NHS CST NHS

Year LUMP
Year Underway
2005 2006
Year Underway
LUMP LUMP
Year Underway
LOCL 2007
Year LUMP
Year Underway
2005 After 2007
Year LUMP
Year LUMP
Year Underway
LOCL LUMP
Year LUMP
Year Underway
2005 After 2007 After 2007

Federal $135,200
Federal $152,100 $8,803,800 Federal
$11,700 $149,400 Federal
$0 $4,000,000
Federal $200,000
Federal $11,200,000
Federal $100,000
Federal $48,000
Federal $0
$214,200 Federal $144,000
Federal $750,000

Slate $33,800
Slate $16,900
$0 Slale
$1,300 $16,600 State
$0 $1,000,000
State $0
State $2,800,000
State $0
State $12,000
State $0
$23,800 State $36,000
State $0

Other $176,000
Other $0
$978,200 Olher $0 $0 Other $0 $0 Other $50,000
Other $0
Other $0
Other $0
Other $45,600
$0 Other
$0
Other $0

Total

t'

$345,000

.'Total
$169,000
$9,782,000 Total
$13,000
$166,000
Total
$0 $5,000,000
Total
$250,000

Total
$14,000,000
Total $100,000

Total $60,000

Total
$45,600
$238,000
Total
$180,000

Total
$750,000

Page 60of 300

...'''

STATE TRANSPORTATION IMPROVEMENT PROGRAM za/2QQ5

Chatham
Project: 0006118 Type Work: Railroad Crossing Descp: CR 11/BIG HILL ROAD@ NS #734148K

LUMP SUM PROJECT

Length: 0.40 TlP#:

Project: 0006256 Type Work: Interchange Descp: 1-16/1-516INTERCHANGE

Length: 0.40 TlP#: 2003-H-08

Project: 0006298 Type Work: Guardrail
Descp: 1-95 @SEV LOCS GUARDRAIL REPLACEMENT IN CAMDENIBRYANICHATHAM Length: 20.02

LUMP SUM PROJECT

TIP#:

Project: 0006328 Type Work: New Construction

Descp: BRAMPTON ROAD CONNECTOR FM FOUNDATION

DR TO SR 25/SR21/US80

Lanes: Exist. 0 Prop. 4

Length: 0.00

TlP#:

Project: 0006456 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN

BRY AN/CHATHAM

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006464 Type Work: Lighting Descp: 1-16 @ 1-95 HIGHMAST INTERCHANGE - LIGHTING

LUMP SUM PROJECT

Length: 0.40 TIP#:

Project: 0006485 Type Work: Railroad Crossing Descp: CR 13/WHEATHILL ROAD @ CSX #632475M

LUMP SUM PROJECT

Length: 0.40 TIP#:

Project: 0006486 Type Work: Railroad Crossing Descp: CS 589/HAWKINSVILLE ROAD @ CSX #635110R

LUMP SUM PROJECT

Length: 0.40 TIP#:

Project: 0006487 Type Work: Railroad Crossing Descp: CR 13/WHEATHILL ROAD @ CSX #635109W

LUMP SUM PROJECT

Length: 0.40 TIP#:

Project: 0006532 Type Work: Historic Facilities

Descp: TYBEE ISLAND LIGHT STATION/ASST KEEPER'S

COTIAGE - PHASE II

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006533 Type Work: Sidewalks

Descp: SR 26IUS 80 CURB CUTS & SOLOMON AVE BIKE

LANES

Length: 0.00

LUMP SUM PROJECT

TIP#:

Phase Fund CST STP

Year LUMP

Federal $150,000

State $0

Phase Fund

PE

4260

PE

1M

CST 1M

Year Underway
2005 After 2007

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $5,850,000
Federal $292,500

State $650,000
State $32,500

Phase Fund

PE

Local

PE

STP

ROW STP

CST STP

Phase Fund

PE

SfP

CST STP

Year LOCL 2005 After 2007 After 2007
Year Underway
LUMP

Federal $0
$4,000
Federal $336,000

State $0
$1,000
State $84,000

Phase Fund CST NHS

Year LUMP

Federal $195,200

State $48,800

Phase Fund CST STP

Year LUMP

Federal $140,000

State $0

Phase Fund CST STP

Year LUMP

Federal $140,000

State $0

Phase Fund CST STP

Year LUMP

Federal $140,000

State $0

Phase Fund CST STP

Year LUMP

Federal $320,000

State $0

Phase Fund CST STP

Year LUMP

Federal $80,000

State $0

Other $0
Other $0
Other $0
Other $500,000
$0
Other $0
Other $313,000
Other $0
Other $0
Other $0
Other $80,000
Other $20,000

Total $150,000
Total $6,500,000
Total $325,000
Total $500,000
$5,000
Total $420,000
Total $557,000
Total $140,000
Total $140,000
Total $140,000
Total $400,000
Total $100,000

Page 61 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM WaDD5

Chatham
Project: 0006634 Type Work: Sidewalks Descp: POOLER SIDEWALK PROJECT

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006700 Type Work: Unknown

Descp: NORTH-SOUTH CONN FROM SR

119IEFFINGHAMTO SR 30/CHATHAM

Lanes: Exist. 0 Prop. 4

Length: 14.40

TIP#:

Project: 521855. Type Work: Widening

Descp: SR 26/0GEECHEE RD FM 4-LN E/LYNES PKWY TO

VICTORY DRiCS 188 Lanes: Exist. 2 Prop. 4

Length: 1.38

TlP#: 87-H-18B

Project: 522170- Type Work: Widening

Descp: SR 17&26/US 80 FM SR 17 TO CHERRY ST IN

BLOOMINGDALE/CHATHAM

Lanes: Exist. 2 Prop. 4

Length: 2.49

TlP#: 96-H-5

Project: 522610. Type Work: Replace Bridge

Descp: SR 25/HOULIHAN BRIDGE OVER THE SAVANNAH

RIVER

Length: 0.30

TlP#: 94-H-1

Project: 522790. Type Work: New Construction

Descp: JIMMY DELOACH PARKWAY EXTENSION FM 1-16

TO US 80

Lanes: Exist. 0 Prop. 4

Length: 2.70

TlP#: 94-H-02

Project: 522850. Type Work: Widening

Descp: 1-516/LYNES PKWY FM VETERANS PKY (SW BYP)

NORTH TO 1-16

Lanes: Exist. 4 Prop. 6

Length: 2.10

TlP#: 2003H-07

Project: 522855. Type Work: Bridge Rehab

Descp: 1-5161LYNES PKWY SBL & NBL @ SR 25/US 17 IN

SAVANNAH

Lanes: Exist. 4 Prop. 6

Length: 0.23

TlP#:

Project: 522880. Type Work: Widening Descp: SR 21 FM SMITH AVE/CS 590 NORTH TO SR 307

Lanes: Exist. 4 Prop. 6

Length: 1.00 TlP#: 2002-H04

Project: 532570- Type Work: Intersection Improvement Descp: ABERCORN ST @ TIBET AVE

Length: 0.12

TlP#: 93-H-12

Project: 532750. Type Work: Turn Lanes

Descp: SR 204/ABERCORN ST. @ EGRESS

LN/OGLETHORPE MALL IN SAVANNAH

Lanes: Exist. 6 Prop. 7

Length: 0.31

LUMP SUM PROJECT

TlP#: 97-H-OI

Phase Fund CST STP

Year LUMP

Phase Fund CST H170

Year 2005

Phase Fund

PE

STP

ROW Local

CST 0010

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LOCL 2007 2007
Year Underway Underway
2005

Phase Fund

PE

Bridge

CST Bridge

Year 2005 After 2007

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2007

Phase Fund PE NHS CST Bond

Year 2005 2007

Phase Fund CST NHS

Year 2007

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year Underway
2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2005

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
LUMP

Federal $140,000

State $0

Other $35,000

Federal $250,000

State $0

Other $0

Federal
$0 $800,000 $5,768,000 Federal

State

Other

$0 $200,000 $1,442.000

$11,583,000 $0 $0

State

Other

$4.197.600 $1,049,400

Federal $960,000

Stare $240,000

$0
Other $0

Federal
$0 $9,792.800

State
$0 $2,448,200

Federal $334,400
$0

State $83,600 $4,180,000

Other
$0 $0
Other $0 $0

Federal $709,600

State $177,400

Other $0

Federal $174,400

State $43.600

Other $0

Federal

State

Other

$768,000 Federal

$192,000 State

$0 Other

$1.075.500

$119.500

$0

Total
$175,000
Total $250,000
Total $11,583,000 $1.000.000
$7.210,000
Total $5,247.000 Total
$1.200,000
'.Total $0
$12.241,000
Total
$418,000
'.$4,180.000
Total
$887.000
Total
$218,000
Total
$960,000 Total
$1.195.000
Page 62 01300

('...e..'''',


STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2QQ5

Chatham

Project: 532760- Type Work: Turn Lanes

Descp: SR 204/ABERCORN ST. @ DERENNE AVE IN

SAVANNAH Lanes: Exist. 5 Prop. 6

Lenglh: 0.20

LUMP SUM PROJECT

TIP#: 97-H-02

Project: 532770- Type Work: Turn Lanes

Descp: SR 204/ABERCORN ST. @ APACHE AVE IN

SAVANNAH Lanes: Exist. 6 Prop. 7

Length: 0.47

LUMP SUM PROJECT

TlP#: 97-H-03

Project: 532780- Type Work: Turn Lanes

Descp: SR 204/ABERCORN ST. @ LARGO DRIVE IN

SAVANNAH Lanes: Exist. 6 Prop. 7

Length: 0.55

LUMP SUM PROJECT

TIP#: 97-H-04

Project: 533200- Type Work: Replace Bridge Descp: SR 204/ABERCORN EXTENSION @ HARMON
CANAL W OF WHITE BLUFF Length: 0.20
TIP#: 2000-H-14

Project: 533205- Type Work: Replace Bridge Descp: CR 302lMONTGOMERY CROSS RD @ CASEY
CANAL 1 MI E OF SR 204 Length: 0.22
TIP#: 2000-H-J5

Project: 550560- Type Work: Widening

Descp: SR 204 SPIWHITFIELD AVE FM OLD WHITFIELD

TO FERGUSON AVE/SAV

Lanes: Exist. 2 Prop. 4

Length: 1.90

TlP#: 87-H-39

Project: MOO0947 Type Work: Miscellaneous Improvement Descp: SR 405/1-95 SAVANNAH WELCOME CENTER

LUMP SUM PROJECT

Length: 0.00 TIP#: 2002-H-07

Project: M002373 Type Work: Bridges

Descp: 1-16SPUR @ TALMADGE BRIDGE - BRIDGE

REHABILITATION

Length: 0.99

LUMP SUM PROJECT

TIP#:

Project: M002383 Type Work: Bridge Painting Descp: PROPOSED BRIDGE PAINTING AT SEVERAL
LOCATIONS IN CHATHAM CO Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: TOO0668 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR SAVANNAH

Length: 0.00 TlP#:

Project: TOO0669 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR SAVANNAH

Length: 0.00 TIP#:

Phase PE ROW CST

Fund STP STP STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase PE ROW CST

Fund Bridge Bridge Bridge

Phase PE ROW CST

Fund Bridge Local Bridge

Phase Fund

PE

STP

ROW STP

ROW STP

CST STP

Phase Fund

PE

1M

Phase Fund CST 1M

Phase Fund CST 1M

Phase Fund CST Transit

Phase Fund CST Transit

Year Underway Underway
LUMP
Year Underway Underway
LUMP
Year Underway Underway
LUMP
Year Underway
2005 2007
Year Underway
LOCL 2006
Year Underway
2005 2006 2007 Year LUMP
Year LUMP
Year LUMP
Year 2005
Year 2005

Federal

State

$594,000 Federal

$66,000 State

$657,000 Federal

$73,000 State

$1,389,600

$154,400

Federal
$12,000 $600,000

State
$3,000 $150,000

Federal
$0 $541,600

State
$0 $135,400

Federal
$567,200 $1,353,600 $6,936,800
Federal $450,000

State
$141,800 $338,400 $1,734,200
State $50,000

Federal $450,000

State $50,000

Federal $158,400

State $17,600

Federal $1,240,273

State $155,034

Federal $5,893,559

State $736,695

Other
$0 Other
$0 Other
$0 Other
$0 $0 Other $181,000 $0 Other $0 $0 $0 Other $0
Other $0
Other $0
Other $155,034
Other $736,695

Total
$660,000 Total
$730,000 Total
$1,544,000 Total $15,000 $750,000 Total $181,000 $677,000 Total $709,000
$1,692,000 $8,671,000
Total $500,000
Total $500,000
Total $176,000
Total $1,550,341
Total $7,366,949

Page 63 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Chatham
Project: TOO0670 Type Work: Transit Projects Oescp: FY 2005 SECTION 5310 CAPITAL FOR SAVANNAH

Lenglh: 0.00 TlP#:

Project: TOO0675 Type Work: Transit Projects Oescp: FY 2005 SAVANNAH SECTION 3037 OPERATING

Length: 0.00 TIP#:

Project: TOO0923 Type Work: Transit Projects Oescp: FY 2006 SECTION 5309 CAPITAL FOR SAVANNAH

Lenglh: 0.00 TIP#:

Project: TOO0927 Type Work: Transit Projects

Oescp: FY 2006 SECTION 5307 OPERATING FOR

SAVANNAH

Length: 0.00

TlP#:

Project: TOO0928 Type Work: Transit Projects Oescp: FY 2006 SECTION 5307 CAPITAL FOR SAVANNAH

Length: 0.00 TlP#:

Project: TOO0929 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR SAVANNAH

Length: 0.00 TlP#:

Project: TOO0942 Type Work: Transit Projects

Oescp: FY 2006 SAVANNAH SECTION 3037 ACCESS TO

JOBS

Length: 0.00

TIP#:

Project: T001164 Type Work: Transit Projects

Oescp: FY 2005 SECTION 5307 OPERATING FOR

SAVANNAH

Lenglh: 0.00

TIP#:

Project: T001246 Type Work: Transit Projects Oescp: FY 2007 SECTION 5307 OPERATING FOR
SAVANNAH Lenglh: 0.00
TIP#:

Project: T001247 Type Work: Transit Projects Oescp: FY 2007 SECTION 5307 CAPITAL FOR SAVANNAH

Length: 0.00 TIP#:

Project: TOO1248 Type Work: Transit Projects Oescp: FY 2007 SECTION 5309 CAPITAL FOR SAVANNAH

Length: 0.00 TIP#:

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Federal $82,190

State $20,547

Other $0

Federal $1,824,225

State $0

Other $9,068.602

Federal $3,920,000

State $490,000

Other $490,000

Federal $1,878,952

State

Other

$0 $9,340,667

Federal $1,140,000

State $142,500

Other $142,500

Federal $86,298

State $21,575

Other $0

Federal $750,000

State $0

Other $750,000

Federal $1,878,952

State

Other

$0 $9,013,875

Federal $1,935,321

State

Other

$0 $9,620,879

Federal $1,240,000

State $155,000

Other $155,000

Federal $3,440,000

State $430,000

Other $430,000

Total
$102,737
Total
$10,892,827 Total
$4,900,000
Total $11,219,619
Total
$1,425,000 Total $107,873
Total
$1,500,000 Total
$10,892,827 Total
$11,556,200
Total $1,550,000 Total $4,300,000 Page 64 of 300

'I.....'''

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2005

Chatham
Project: T001249 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR SAVANNAH
Length: 0,00 TIP#:
Project: T001251 Type Work: Transit Projects Descp: FY 2007 SAVANNAH SECTION 3037 ACCESS TO
JOBS Length: 0,00 TlP#:
Project: T001284 Type Work: Transit Projects Descp: Chatham Area Transit Buses and Bus Facilities
Length: 0,00 TlP#:

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2005

Federal $90,614

State $22,653

Other $0

Federal $1.000.000

State $0

Other $1,000,000

Federal $5,893,559

State $589,356

Other $589,356

Total $113,267
Total $2,000,000
Total $7,072.271

.,



Page 65 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I2005

Chattahoochee

Project: 0001368 Type Work: Replace Bridge

Descp: CR 58 @ GEORGIA SOUTHWESTERN RAILROAD

4.6 MI E OF CUSSETA

Length: 0.30

TlP#:

Project: 0001893 Type Work: Turn Lanes

Descp: SR 520 FROM 1185/MUSCOGEE TO SR 26/MP

8.51/CHATTAHOOCHEE Lanes: Exist. 4 Prop. 5

Length: 10.28

LUMP SUM PROJECT

TlP#: Safe Lump

Project: 0002408 Type Work: Guardrail
Descp: LINDSAY CREEK PKWY FROM 1ST DIVISION RD/CHATT TO 1-185/MUSCG Length: 0.00

LUMP SUM PROJECT

TlP#: Safe Lump

Project: 0006258 Type Work: Intersection Improvement Descp: US 280/US 27 INTERSECTION IN CUSSETA

Length: 0.40 TlP#:

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2007

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST 064

Year 2005

Federal $0
$759,200 Federal $1.991.700
Federal $819,000
Federal $200,000

State $0
$189.800 State $221.300
State $91.000
State $50.000

Other $12.500
$0 Other
$0
Other $0
Other $0

Total
$12,500
$949.000 Total
$2.213.000
Total
$910.000 Total
$250.000
.' Page66of300

...."''',
.',
t,
.'t
t)

..''f' ..''',',
t,
..',t'. ,

STATE TRANSPORTATION IMPROVEMENT PROGRAM za12QQ5

Chattooga

Project: 0000677 Type Work: Replace Bridge

Descp: CR 87/PEACH ORCHARD ROAD @ ALPINE CREEK

1 MI SE OF MENLO Lanes: Exist. 0 Prop. 1

Length: 0.20

TlP#:

Project: 0000679 Type Work: Replace Bridge Descp: CR 32210LD HIGHWAY 337 @ CHELSEA CREEK
3.2 MI NE OF MENLO Length: 0.21
tte

Project: 0000846 Type Work: Replace Bridge Descp: CR 325/FH 12/HAMMOND GAP ROAD @ RUFF
CREEK NW OF SUBLIGNA Length: 0.20
TlP#:

Project: 0003081 Type Work: Replace Bridge Descp: CR 321ITALIAFERRO SPRINGS@ CHATTOOGA
RIVER 1 MI S OF LYERL Y Length: 0.19
TIP#:

Project: 0005530 Type Work: Replace Bridge Descp: SR 48 @ EAST FORK LITTLE RIVER

Length: 0.20 TlP#:
Project: 00066:z1 Type Work: Historic Facilities Descp: SUMMERVILLE DEPOT RENOVATION

LUMP SUM PROJECT

Length: 0.00 T/P#:

Project: 621082. Type Work: Widening

Descp: SR 1IUS27/SUMMERV'LE BYP FM CR 329 TO N OF

CR325 @ SR 1/US27 Lanes: Ex/st. 2 Prop. 4

Length: 8.00

TlP#:

Project: 621610. Type Work: Widening

Descp: SR 1IUS 27 FM HARRELL ST/CR 331 IN TRION TO

SR 151/WALKER CO

Lanes: Exist. 2 Prop. 4

Length: 4.72

TIP#:

Project: 642470 Type Work: Replace Bridge Descp: CR 3321BACK BERRYTON ROAD @ RACCOON
CREEK CENTER OF BERRYTON Length: 0.22
TlP#:

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2007

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2007

Phase PE ROW CST

Fund Forest Hw Local Forest Hw

Year Underway
LOCL 2005

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2007

Phase Fund PE Bridge ROW Bridge CST Bridge

Year 2005 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Federal $0
$320.000
Federal $0
$320,000
Federal $0
$729,000
Federal $0
$676,800
Federal $36,000

State $0 $0
State $0 $0
State $0 $0
State $0
$169,200
State $9,000

Federal $200,000

State $0

Phase Fund

PE

State

ROW Bond

ROW Bond

CST Bond

Phase Fund PE State ROW State CST Bond

Year Underway
2006 2007 After 2007
Year Underway Underway
2005

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2007

Federal
$0 $0

State
$4,885,000 $5,000,000

Federal

State

$0 $16,500,000

Federal
$0 $722,400

State
$0 $0

Other $16,000 $80,000
Other $10,000 $80,000
Other $0 $0
Other $10,000
$0
Other $0
Other $50,000
Other $0 $0
Other
$0
Other $10,000 $180,600

Total $16.000 $400.000
Total $10,000 $400,000
Total $0
$729,000
Total $10.000 $846,000
Total $45,000
Total $250,000
Total $4,885,000 $5,000,000
Total
$16,500,000
Total $10,000 $903,000

Page 67 of 300

STATE TRANSPORTA TION IMPROVEMENT PROGRAM 217/2005

Cherokee
Pro~t: 0000418 Type WOTk.- Intersection Improvement Descp: OLD SR 5/CR 1061 @ HICKORY RD & HOLLY Sf IN
HOl.LY SPRINGS Length" 0.35
TlP#: CH-20S

Project: 0002837 Type Work: Widening

Descp: SIXES ROAD/eR 779 FROM 1-575 TO OLD SR 51CR

1061 Lanes: Exist. 2

ProP, 4

Length: 0.32

TlPII: CH-190

Project: 0002846 Type Work: Widening Descp: HICKORY FLAT ROAD IN CANTON(LCI PROJECT)

LUMP SUM PROJECT

Length: 3.54 T1P#: CH-AR-240

P~ct: 0002147 TYPfI Work; Widening

Descp: WALESKA STREET FM MAIN/NORTH 5T TO SR 5

BUS (LCI PROJECT)

l.ength: 0.49

LUMPSUM PROJECT

TlP#: CH~AR-24\

Project: (1002141 Typ~ Worn.- Widening

Descp: RAILROAD STREET TRAIL IN CANTON PHASE 1

(Lei PROJECT)

l.ength: 0.00

LUMP SUM PROJECT

TlP#: CH-AR-242A

Project: 0002112 Type Work; Widening

Oesc:p: SR 20 FROM SR 369JCHEROKEE TO SR

371/FORSYTH Lanes: Exist. 2 Prop. 4

Length: 6.37

TlP#: FT-061

Project: 0003111 Type Work.- Widening Descp: SR 20 FROM 1-575 TO SR 369

Lanes: Exist. 2 Prop. 4

Length: 8.64 TIP#: CH-020B

Projec/: 0003771 Type WoriI.- Lighting
Descp: EAST MAIN STREET PEDESTRAIN LIGHTING IN
CANTON Length: 1.35
TIP#: CH-216

Project: 8003&40 Type Werle Intersection Improvemem Descp: SR 5 BUIHOWELL BRIDGE RO AT BALL GROUND
HWY & OLD CANTON RD Length: 0.27

LUMP SUM PROJECT

TlP#: AR-118

Project: 80044" Type Worle BicyclefPed. Facility Descp: MAIN STREET FM WOODSTOCK LIBRARY TO
CHEROKEE CO SOUTH ANN~X Length: 0.33
TlP#: CHAR-BPOI

Project: 000441$ Ty"P~ Work: Bicycll:!/Ped. Facility

Descp: MARIETTA ROAD FM MARIETTA HIGHWAY TO

HICKORY FLAT ROAD

Length: 1.19

Tlp# CH-AR-BPOI

Phase Fund PE STP ROW Local CST STP

Y. .,
Underway LOCL
2006

Phase Fund
PE local ROW Local CST STP

Y. .,
LOCL LOCL
2005

Phase FUnd PE STP CST STP

Y. .,
Underway LUMP

Phase Fund PE STP CST STP

Y. .,
Underway LUMP

Phase Fund PE Local ROW Local CST STP

Ye" LOCL
LOCL
LUMP

Phase PE ROW CST

FlJnd STP STP STP

Y. .,
Underway After 2007 After 2007

Phase Fund PE STP ROW STP ROW STP CST STP
Phase Funcl PE Local CST STP

Y. .,
2007 After 2007 After 2007 After 2007
Y..,
LOCL 2005

Phase Fund ROW Local CST STP

Y..,
LOCL LUMP

Phase Fund PE Local CST CMAQ

Y. .,
lOCL 2005

Phase Fund PE Local ROW Local CST CMAQ

Year LQCL LOCL 2005

Federal $0
$160,000
Feci.,,,,
$0 $0 $708,000
FedfN7ll $960,000
Federal 51,232,000
Federal $0 $0
$1,600,000
Federal
Federal $1,920,000
Federal $0
$400,000
Federal $0
$601,639
Fedel7JI $0
$176,000
Federal $0 $0
$1,200,000

State
$0 $0

Oth.r
$253,750 $40,000

State $0 $0
$177,000

Other
$1CN),OOO $200,000
$0

State $0

Other $240,000

State $0

Orher $308,000

State $0 $0 $0

Other $100,000
$0 5400.000

State

Other

Sl.te $480.000

Other $0

St.te $0 $0

Other $20,000 $100,000

State $0
$66,&49

Other $48,700
$0

State $0 $0

Other $30,000 $44,000

Sfare $0 $0 $0

Other $100,000 $100,000 $300.000

Total $253.150 5200.000
Total 5100,000 $200.000 S885.000
To,.,
$1,200,000
Total
$1,540,000
To,.,
$100.000 $0
$2,000.000
TOIO'
Total $2,400,000
rOlO'
$20,000 $500,000
To,., $48,700
$668,""88
Total $30,000 $220,000
Total
$100,000 $100,000 $1,500,000

Page 68 of 300



STATE TRANSPORTA nON IMPROVEMENT PROGRAM 2012005

Cherokee
Proj9ct: 000"" Type Work: Bicycle/Ped, Facility Descp: TOWNE LAKE PARKWAY FROM MAIN STREET TO
1-575 Length' 0.76
TIP#" CII-ARBPOl
Project: 0004417 Type Worx; Bicycle/Pad Facility Descp: WOODSTOCK GREENWAY
Lenglh" 0.00
TlP#: C'H AR oro)

Ph.,. Fund
PE Local
CST CM,I\Q

Year LOCL 2005

Phase Fund PE local CST CMAQ

vu,
LOCL 2005

Fodefill $0
$408,000

Slat. $0 $0

Ome,
$90.000 $102,000

Total $90,000 $510,000

HH:te('(l1 $0
$1,360.000

Stafe SO $0

OUler $300,000 $340,000

Total $300.000 $1,700,000

Project: 0004491 Type Work: Bicycle/Pad. facility

Phase Fund

Year

Federal

Stilte

Other

ToYI

Descp: PUTNAM FORD ROAD FROM BASCOMBCARMEl

ROW Local

LOCL

$0

$0

$50,000

$50,000

.~

ROAD TO EAGLE DRIVE

CST CMAQ

2005

$187,600

SO

$49,400

$247,000

Length: 1.08

"-

TlP#: C'H-ARor04

"-
~
I.-
L
l.
L
L l-
l. l. l. ll. l. \.. l. l. l. L l-
C

Project: oo~tt TypeWor/(: BicycleIPed. Facility Descp: WOODSTOCK RD FM OAK GROVE SCHOOL RD TO
OAK GROVE ELEMENTARY Length: 0.25
TIP#.: CH-AR-Bro4

Project: 000$970 Type Work: Roadway Project

Oescp: SR 3721BALLGROUND RD FM CANTON HWY TO

CUMMINGHWY

Length 9.85

n"" CH-165

Project: 00g8288 Type Work: Barriers Descp: 1-575 FM TOWN LAKE PKWY TO PICKENS
CO-CABLE MEDIAN BARRIERS Length: 21.98

LUMP SUM PROJECT

TlP#:

Project: 00083304- Typ~ Work: AlMs/ITS

Descp: ATM$/1-75 N COMMUNICISURVEILANCE FM WADE

GREEN RD TO SR 92

Lellgth: 4.28

TIP#.: AR-432

Project: 00"577 Type Work' Multi-use Trail {)eScp: UTILE RIVER GREENWAY & TRAIL PROJECT

LUMPSUM PROJECT

Length: 0.00 TlP#:

Project 0008584 Type WorK: Streetscapes Descp: BALL GROUND DOWNTOWN STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project OOl)$Sl.S Type Work: sweeteeeces
Descp: NELSON PEDESTRIAN ENHANCEMENTS

LUMP SUM PROJECT

Length: 0.00 TlP#'

Phase Fund PE Local ROW Local CST CMAQ

Year LOCL LOCL 2005

Phase Fund PE S7P ROW 5TP CS7 STP

Vw 2007 After 2007 After 2007

Phase Fund PE STP CST STP

Y. . r
Underway LUMP

Feder'"
SO So
$72,000
Fede,..1 $235.200
FGdefiJl $1,566,5100

Srare SO SO $0
Srare 558.800
srare $174,100

O"er
$a,000 $20,000 $18,000
Orher $0
Orher SO

Phase Fund PE NHS CST NHS

V. ., 2005 2006

Feder.1 $120,000 $4,000,000

S[a(e $30.000 $1,000.000

Orher
So SO

Phase Fund CST STP

Vw LUMP

Feder.! $500,000

Srare $0

0 ..., 5125,000

Phase Fund CST STP

V.., LUMP

Fede,..! $520.000

Stare
SO

O"er
$130,000

Phase Fund CST STP

Y. .,
LUMP

F:eder.t $400,000

sere $0

Orher $100,000

Total
se.ooo
$20,000 $90,000
Total $294,000
Total $1,741.000
Toto' $150,000 $5,000,000
Total $625,000
Total $650,000
To,., $500.000

L

Project: 000e118 Ty~ Work: Intersection Improvemenl

Phase Fund

Year

Federal

State

Other

Totl'

Dasc/J: CS 678/MARIETTA ROAD@CS681/HICKORYFLAT

PE Local

LOCL

$0

$0

$60,000

$60,000

L

ROAD

Length: 0.40

CST STP

2005

$272,000

$0

$BB,OOO

$340,000

\...

TIP#' C'H-:!06

'--

"-

Page 69 or 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Cherokee
Project: 0006859 Type Work: Transit Facilities Descp: CITY OF CANTON INTERMODAL TRANSFER
STATION AND PARK & RIDE Length: 0.00
TlP#: CHAR-261
Project: 810740. Type Work: Interchange Descp: 1-75 @ SR 92

Length: 0.25 TlP#: CHAR-I08

Project: 611250- Type Work: Auxiliary Lanes Descp: 1-575 AUXILIARY LANES BETWEEN SR 92 AND
TOWNE LAKE PARKWAY Length: 0.89
TlP#: CH-AR-229

Project: 811260. Type Work: Auxiliary Lanes

Descp: 1-575 AUXILIARY LANES BETWEEN SR 20 AND SR

5 BUSINESS

Length: 0.36

TIP#: CH-AR-230

Project: 811270- Type Work: Interchange Descp: 1-575 AT SR 20 -INTERCHANGE
RECONSTRUCTION Length: 0.28
TlP#: CH-AR-23I

Project: 820920. Type Work: Widening

Descp: SR 92 FM W OF WADE GREEN ROAD EASTERLY

TO CHEROKEE TRAIL

Lanes: Exist. 2 Prop. 4

Length: 4.70

TlP#: CH-003

Project: 820940. Type Work: Widening Descp: SR 92 FM 175 TO WADE GREEN ROAD

Lanes: Exist. 2 Prop. 4

Length: 4.50 TIP#: CHOO4

Project: 830975. Type Work: Replace Bridge

Descp: CR 770/BELLS FERRY RD FM NO VICTORIA TO .2

MI N/LITILE RV

Lanes: Exist. 2 Prop. 4

Length: 0.63

TlP#: CHOlOB

Project: 832790- Type Work: Passing Lanes

Descp: SR 20: 3 TRUCK CLIMBING LANES AND INT IMP

FM 1-575 TO CR 238 Lanes: Exist. 2 Prop. 3

Length: 4.90

TlP#: CH-020Al

Project: 832840. Type Work: Turn Lanes

Descp: SR 140 FM ARNOLD MILL RD/CR 777 TO

MOUNTAIN RD/CR 311 Lanes: Exist. 2 Prop. 3

Length: 1.70

TlP#: CH140F

Project: 832850. Type Work: Intersection Improvement

Descp: SR 140@ HICKORY ROAD/CR 778 & BATESVILLE

ROAD/CR298

Length: 0.53

TlP#: CH-140EI

Phase Fund

PE

Local

ROW STP

CST STP

Year LOCL 2006 2007

Phase Fund PE NHS ROW NHS CST NHS

Year Underway Underway
2005

Phase Fund

PE

NHS

CST NHS

Year Underway
2005

Federal $0
$240,000 $340,000
Federal

State $0 $0 $0
State

$4.680,400 $1,170,100

Federal $1,621,070

State $405,267

Phase Fund

PE

NHS

CST NHS

Year Underway
2005

Federal $478,385

State $119,596

Phase Fund PE NHS ROW NHS CST NHS

Year Underway
2005 2006

Federal
$1,531,200 $748,800

State
$382,800 $187.200

Phase PE ROW CST

Fund NHS NHS NHS

Year Underway Underway
2005

Federal

State

$9,315,200 $2,328,800

Phase Fund

PE

NHS

ROW NHS

ROW NHS

CST NHS

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway Underway
2006 2007
Year Underway
LOCL 2006

Federal
$12,173,600 $12,580,800
Federal
$0 $5,052,000

State
$3,043,400 $3,145,200
State $0
$1,263,000

Phase Fund

PE

STP

ROW STP

ROW STP

CST STP

Phase Fund

PE

051

ROW STP

CST STP

Year Underway Underway
2006 After 2007
Year Underway
2005 2006

Federal

State

$5,895,200 $1,473,800

Federal
$0 $1,301,600

State
$1,302,000 $325,400

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 After 2007

Federal $20,800

State $5,200

Other $75,000 $60,000 $85,000 Other
$0 Other
$0
Other $0
Other $0 $0
Other
$0 Other
$0 $0 Other $0 $0 Other
$0 Other
$0 $0 Other $574,000

Total $75,000

.\

$300,000 $425,000 Total
$5,850,500 Total
$2,026,337
Total

...''111''

$597,981 Total



$1,914,000 $936,000
" Total $11,644,000
Total $15,217,000
$15,726,000
Total $0
$6,315,000
.-j'Total
..''$7,369,000
Total
$1,302,000
$1,627.000
.'Total
$600,000
Page 70of300

,J.-'


STATE TRANSPORTA TlON IMPROVEMENT PROGRAM Za12QQ5

Cherokee

Project: 632855- Type Work: Turn Lanes

Oescp: SR 140 AT MAULDIN ROAD/CR 323 AND UNIVETER

ROAD/CR 309 Lanes: Exist. 2 Prop. 3

Length: 0.40

TIP#: CH-140DI

Project: 642400- Type Work: Replace Bridge

Descp: SR 372 @ ETOWAH RIVER 2.3 MI SE OF BALL

GROUND

Length: 0.76

TIP#: CH-204

Project: 662650. Type Work: Intersection Improvement Descp: SR 20 @ SR 108; WHITE ROAD/CR 17 & MT.
CARMEL LANE/CR 13 Length: 0.20
TIP#: CH-209

Project: 671951- Type Work: Replace Bridge Descp: CR 107/HOWELL BRIDGE RD @ SHARP MTN
CREEK SW OF BALL GROUND Length: 0.13
TlP#: CH-199

Project: 714090- Type Work: ATMS/ITS

Descp: ATMS: 1-575 COMM/SURVEILLANCE FM 1-75/COBB

TO SR 92JCHEROKEE

Length: 8.58

TlP#: AR-341

Project: 721308- Type Work: Replace Bridge Descp: SR 140/HOUZE RD OVER LITTLE RIVER @
FULTON/CHEROKEE CO LINE Length: 0.50
TlP#: FN-232B

Project: M002965 Type Work: Guardrail

Descp: 1-75 FROM SR 5 CONNECTOR TO CR 633/RED TOP

MOUNTAIN ROAD

Length: 24.53

TIP#: AR-126G

Project: TOO0591 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR CHEROKEE

COUNTY

Length: 0.00

TlP#: AR-CH-5310

Project: TOO0988 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR CHEROKEE

COUNTY

Length: 0.00

TlP#: AR-CH-5310

Project: TOO1271 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR CHEROKEE

COUNTY

Length: 0.00

TIP#: AR-CH-5310

Phase PE ROW CST

Fund STP STP STP

Year Underway Underway
2006

Federal $240,000

State $60,000

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 After 2007

Federal $64,000

State $16,000

Phase Fund

PE

STP

ROW STP

CST STP

Year 2006 After 2007 After 2007

Federal $8,000

State $2,000

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2006

Federal
$0 $1,089,000

State
$0 $272,000

Phase PE PE CST

Fund NHS NHS NHS

Year Underway
2005 2006

Federal
$120,000 $10,440,800

State
$30,000 $2,610,200

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006

Federal
$80,000 $2,192,000

State
$20,000 $548,000

Phase Fund

PE

1M

CST 1M

Year 2005 2005

Federal $1,800,000 $38,400,000

State $200,000 $9,600,000

Phase Fund CST Transit

Year 2005

Federal $22,881

State $5,720

Phase Fund CST Transit

Year 2006

Federal $24,025

State $6,006

Phase Fund CST Transit

Year 2007

Federal $25,226

State $6,307

Other
$0 Other
$0
Other $0
Other $400,000
$0 Other
$0 $0 Other $0 $0 Other $0 $0
Other $0
Other $0
Other $0

Total
$300,000 Total $80,000
Total $10,000
Total $400,000 $1,361,000 Total $150,000 $13,051,000 Total $100,000 $2,740,000 Total $2,000,000 $48,000,000
Total $28,601
Total $30,031
Total $31,533

Page 71 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM Za/2QQ5

Clarke

Project: 0001583 Type Work: Turn Lanes

Descp: SR 8/US 29 MED TN LNS FM NE OF ATHENS TO

OLD SR 106/MADISON

Length: 3.66

TIP#: R-75

Project: 0003374 Type Work: Railroad Crossing

Descp: CR 38/RIVERBEND RD IN WHITEHALL @ NS #

733078U

Lenglh: 0.00

LUMP SUM PROJECT

TlP#: RR-OI16

Project: 0005922 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ 7 LOCS ALONG

SR 10lUS 78 BUS

Lenglh: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006320 Type Work: Replace Bridge

Descp: CR 481/COLLEGE STATION RD BRIDGE OVER N

OCONEE RIVER EAST

Length: 0.40

TlP#: 8-7

Project: 0006321 Type Work: Replace Bridge

Descp: CR 481/COLLEGE STATION RD BRIDGE OVER N

OCONEE RIVER WEST

Length: 0.40

TIP#: B-7.

Project: 0006635 Type Work: Multi-use Trail Descp: ATHENS RAIL TO TRAIL - PHASE II

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 121970- Type Work: Widening

Descp: CR 600/DANIELSVILLE RD FM 4-LN NEAR CR 109

TO WALKER DRIVE

Lanes: Exist. 2 Prop. 4

Length: 1.10

TIP#: R-34

Project: 122160- Type Work: Widening

Descp: SR 15 ALT/US 129 FM LAVENDER DR/CLARKE TO

SR 330/JACKSON

Lanes: Exist. 2 Prop. 4

Length: 3.71

TIP#: R-33

Project: 122600- Type Work: Intersection Improvement

Descp: SR 10 LOOP/ATHENS PERIMETER AT US

78/LEXINGTON RD

Lanes: EXist. 4 Prop. 6

Length: 0.70

TIP#: R-47

Project: 122850- Type Work: Interchange Descp: SR 10 LOOP/ATHENS PERIMETER AT PETER
ST/CS 306 & OLYMPIC DR Length: 0.75
TIP#: R-35

Project: 122890- Type Work: Interchange Descp: SR 10LP/PAUL BROUN PKWY AT SR 10/ATLANTA
HWY IN ATHENS Length: 0.80
TIP#: R-n

Phase Fund PE STP CST STP

Year Underway
2006

Federal $4.048.000

State $1.012.000

Phase Fund CST STP

Year LUMP

Federal $100.000

State $0

Phase Fund CST STP

Year LUMP

Federal $440.000

State $110.000

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year 2005 2006 After 2007

Federal $80.000 $80.000

Phase Fund PE Bridge ROW Bridge CST Bridge CST STP
Phase Fund CST STP

Year 2005 2006 After 2007 After 2007 .
Year LUMP

Federal $48.000 $80.000
Federal $184.800

State $20.000 $20.000
State $12.000 $20.000
State $0

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2007

Federal
$800.000 $3.480.000

State
$0 $0

Phase Fund PE STP ROW STP CST STP

Year Underway Underway
2005

Phase Fund PE STP ROW STP CST STP

Year Underway
2006 2007

Phase Fund

PE

NHS

ROW STP

CST STP

Year Underway
2006 After 2007

Federal

State

$9.212.000 $2.303.000

Federal
$490,400 $3,205.600

State
$122.600 $801,400

Federal $121.600

State $30,400

Phase Fund

PE

NHS

ROW STP

ROW STP

CST STP

Year Underway Underway
2007 After 2007

Federal $2.184.000

State $546.000

Other $0
Other $0
Other $0
Other $0 $0
Other $0 $0
Other $46.200
Other $200.000 $870.000
Other
$0 Other
$0 $0 Other $0
Other
$0

Total $5.060.000
Total $100.000
Total $550.000



Total $100.000
I $100.000
Total $60.000
$100.000
.'Total
$231.000

Total $1.000.000 $4.350.000

Total

$11.515.000

~

Total

$613.000 $4.007.000

Total
$152.000

Total
$2.730.000

Page 72 of300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2012005

Clarke

Project: 132660. Type Work: Widening

Descp: SR 10/US 78 FM WHIT DAVIS RDICR 166 TO

SMOKEY/CR 26/& OGLETH

Lanes: Exist. 2 Prop. 4

Length: 11.48

TIP#: R-41

Project: 142205. Type Work: Intersection Improvement Descp: WINTERVILLE RDICR 470 AT INDIAN HILLS &
SPRING VALLEY-REALGN Length: 0.35
TlP#: R-54

Project: 142235- Type Work: Intersection Improvement

Descp: HAWTHORNE AVEICR 811 AT OLD WEST BROAD

STICR 938

Length: 0.25

TlP#: R-74

Project: TOO0644 Type Work: Transit Projects Descp: FY 2005 ATHENS SECTION 5307 OPERATING

Length: 0.00 TlP#:

Project: TOO0645 Type Work: Transit Projects Descp: FY 2005 ATHENS SECTION 5307 CAPITAL

Length: 0.00 TlP#:

Project: TOO0646 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR ATHENS

Length: 0.00 TlP#:

Project: TOO0647 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR ATHENS

Length: 0.00 TlP#:

Project: TOO0905 Type Work: Transit Projects Descp: FY 2006 ATHENS SECTION 5307 OPERATING

Length: 0.00 TIP#:

Project: TOO0906 Type Work: Transit Projects Descp: FY 2006 ATHENS SECTION 5307 CAPITAL

Length: 0.00 TIP#:

Project: TOO0907 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR ATHENS

Length: 0.00 TlP#:

Project: TOO0908 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR ATHENS

Length: 0.00 TlP#:

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL 2005

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL 2007

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Federal $5,656,800

State $1,414,200

Other $0

Federal
$0 $800,000
Federal
$0 $400,000
Federal $477,000

State
$0 $0

Other
$0 $200,000

State
$0 $0

Other
$0 $100.000

State $0

Other $3,034.101

Federal $1,270.729

State $158,841

Other $158.841

Federal $400.000

State $50.000

Other $50.000

Federat $22.881

State $5.720

Other $0

Federal $502.000

State $0

Other $3,011,630

Federal $1.308,850

State $163,606

Other $163.606

Federal $400,000

State $50,000

Other $50,000

Federal $24.025

State $6.006

Other $0

Total $7.071.000
Total $0
$1.000.000 Total $0 $500,000 Total
$3.511.101
Total $1.588,411
Total $500.000
Total $28.601
Total $3.513.630
Total $1.636,063
Total $500.000
Total $30.031

Page 73 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 20/2005

Clarke
Project: T001115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rail Phase II
Length: 0.00 TlPII:
Project: T001225 Type Work: Transit Projects Descp: FY 2007 ATHENS SECTION 5307 OPERATING
Length: 0.00 TlPII:
Project: T001226 Type Work: Transit Projects Descp: FY 2007 ATHENS SECTION 5307 CAPITAL
Length: 0.00 TlPII:
Project: T001227 Type Work: Transit Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR ATHENS
Length: 0.00 TlPII:
Project: T001228 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR ATHENS
Length: 0.00 TlPII:
Project: T001279 Type Work: Transit Projects Descp: Athens Multimodal Station
Length: 0.00 TlPII:
Project: T001283 Type Work: Transit Projects Descp: Athens-Clarke County Park & Ride Project
Length: 0.00 TlPII:

Phase Fund
CST HPP

Year 2005

Federat $5,702,000

State $1,425,500

Other $0

Phase Fund
CST Transit

Year 2007

Federal $517,061

State $0

Other $3.101,978

Phase Fund
CST Transit

Year 2007

Federal $1,348,116

State $168.515

Other $168.515

Phase Fund
CST Transit

Year 2007

Federal $400,000

State $50,000

Other $50,000

Phase Fund
CST Transit

Year 2007

Federal $25.226

State $6,307

Other $0

Phase Fund
CST Transit

Year 2005

Federal $1,571.616

State $0

Other $392,904

Phase Fund
CST Transit

Year 2005

Federal $2,701,214

State $0

Other $675,303

Total
$7.127.500
Total $3.619,039 Total $1,685,145 Total $500,000 Total $31.533 Total $1.964.520 Total
$3.376.517 Page 74 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 20/2005

Clay

Project: 0001369 Type Work: Replace Bridge Descp: CR 76 @ DRAG NASTY CREEK 9 MI N OF FORT
GAINES Length: 0.22
TIP#:

Project: 0006527 Type Work: Water Pollution Mitig.
Descp: 3 PARCELS TO MITIGATE PI#422115 & 422220/EARLY &422230/CLAY Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 422230- Type Work: Widening

Descp: SR 1IUS27FM BLUFFTON BYP TO CARNEGIE VILU

RD/CR 153lRANDOLPH Lanes: Exist. 2 Prop. 4

Length: 6.86

TIP#:

Project: T001286 Type Work: Transit Projects

Descp: Regional Transit for Quitman, Clay, Randolph &

Stewart Count

Length: 0.00

TlP#:

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2006

Phase Fund ROW STP

Year LUMP

Federal
$0 $520,000
Federal $1,600,000

State
$0 $130,000
State $400,000

Phase Fund PE State PE State ROW RRBS CST RRBS
Phase Fund CST Transit

Year Underway Underway
2006 2007
Year 2005

Federal

State

$0 $0
Federal $491,330

$5,769,000 $16,025,000
State $0

Other
$10,000 $0
Other $0

Total
$10,000 $650,000
Total $2,000.000

Other

Total

$0 $0
Other $98,266

$5,769,000 $16.025.000
Total $589,596

Page 75 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM Wl2QQ5

Clayton
Project: 0000621 Type Work: Sidewalks Descp: RIVERDALE SIDEWALKS TO SCHOOLS

Length: 0.00 TlP#: CL-AR-BPOO

Project: 0000622 Type Work: Sidewalks

Descp: FOREST PARK SIDEWALKS TO SCHOOLS -

PHASE 1

Length: 9.10

TlP#: CL-AR-BP23

Project: 0000623 Type Work: Sidewalks

Descp: FOREST PARK SIDEWALKS TO SCHOOLS -

PHASE 2

Length: 4.76

TlP#: CL-AR-BP24

Project: 0001759 Type Work: HOV Lanes

Descp: 1-75FROM SR 54 NORTH TO AVIATION BLVD-

FOR HOV LANES Lanes: Exist. 8 Prop. 10

Length: 6.40

TIP#: AR-H-050A

Project: 0001817 Type Work: Railroad Crossing

Descp: AVIATION BLVD/ CR 1516 GRADE SEPARATION AT

NSRR

Length: 1.10

TlP#: AR-510

Project: 0002754 Type Work: ATMS/ITS Descp: ATMS:I-285 SURVEIL FM 1-75/CLAYTON NE THRU
FULTN TO 1-20/DEK Length: 11.45
TIP#: AR-281

Project: 0002849 Type Work: Sidewalks

Descp: TRANSIT-ORIENTED STREETSCAPE IN MORROW

(LCI PROJECT)

Length: 0.00

LUMP SUM PROJECT

TlP#: CL-AR-243

Project: 0003162 Type Work: HOV Lanes

Descp: 1-85 FROM RIVERDALE RD NORTH TO 1-75 FOR

HOVLANES

Lanes: Exist. 6 Prop. 8

Length: 5.86

TlP#: AR-H-150A

Project: 0003167 Type Work: HOV Lanes Descp: 1-75 FM SR 54/CLAYTON TO EAGLES LANDING

PKY/HENRY HOV LANES

Lanes: Exist. 8 Prop. 10

Length: 8.16

TlP#: AR-H-051A

Project: 0004401 Type Work: Widening

Descp: TARA ROAD FROM MCDONOUGH RD TO TARA

BLVD

Lanes: Exist. 2 Prop. 3

Length: 2.87

TlP#: CL-099

Project: 0004402 Type Work: ATMS/ITS Descp: ATMS: CLAYTON COUNTY ATMS ENHANCEMENT
IMPLEMENTATION Length: 0.00
TlP#: CL-237B

Phase Fund

PE

Local

ROW Local

CST CMAO

Year LOCL LOCL 2005

Phase Fund PE STP ROW Local CST STP

Year 2006 LOCL After 2007

Phase Fund

PE

Local

CST STP

Year LOCL 2007

Federal $0 $0
$1,190,400
Federal $0 $0
Federal $0
$800,000

State $0 $0 $0
State $0 $0
State $0 $0

Phase Fund

PE

NHS

ROW Bond

CST NHS

Year 2005 After 2007 After 2007

Federal $5,760,000

State $1,440,000

Phase Fund

PE

STP

ROW STP

CST STP

Year 2006 After 2007 After 2007

Federal $686,400

State $171,600

Phase Fund CST Bond

Year 2005

Federal $0

State $12,758,000

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Federal
$0 $1,024,000

State
$0 $0

Phase Fund

PE

NHS

PE NHS

ROW Bond

CST NHS

Phase Fund

PE

NHS

ROW Bond

CST NHS

Year 2006 After 2007 After 2007 After 2007
Year 2006 After 2007 After 2007

Federal $4,000,000

State $1,000,000

Federal $6,400,000

State $1,600,000

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year Underway
2005 2006

Federal
$0 $0

State
$350,000 $2,500,000

Phase Fund

PE

Bond

CST Bond

Year 2005 2006

Federal $0 $0

State $950,000 $5,400,000

Other $125,000
$75,000 $297,600
Other $188,000
$50,000
Other $100,000 $238,000
Other $0
Other $0
Other $0
Other $0
$256,000
Other $0
Other $0
Other $0 $0
Other $0 $0

Total $125,000
$75,000 $1,488,000
Total $188,000 $50,000
Total $100,000 $1,038,000
Total $7,200,000
Total $858,000
Total $12,758,000
Total $0
$1,280,000 Total
$5,000,000
Total $8,000,000
Total $350,000 $2,500,000 Total $950,000 $5,400,000
Page 76 of 300



.'

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Clayton

Project: 0004445 Type Work: Signals Descp: SR 54/JONESBORO 16 SIGNAL UPGRADES FM
REX RD TO EAST DIXIE Length: 3.47

LUMP SUM PROJECT

TIP#: CL-236

Project: 0004471 Type Work: Parking Areas

Descp: CITY OF MORROW PARKING DECK FY 2004 LCI

PROJECT

Length: 0.00

LUMP SUM PROJECT

TIP#: CL-AR-244

Project: 0004500 Type Work: Bicycle/Ped. Facility Descp: LAKE HARBIN ROAD FROM MADDOX ROAD TO SR
42 Length: 4.76
TIP#: CL-AR-BP05

Project: 0004501 Type Work: Bicycle/Ped. Facility Descp: TRANSIT ORIENTED PED IMPROVEMENTS FM 1-75
TO US 19/41 Length: 4.76
TIP#: CL-AR-BP09

Project: 0004502 Type Work: Sidewalks

Descp: FOREST PARK SIDEWALKS TO SCHOOLS -

PHASE 3

Length: 4.76

TIP#: CL-AR-BP-2

Project: 0004633 Type Work: Bicycle/Ped. Facility Descp: JONESBORO DOWNTOWN PED STREETSCAPE
FM NORTH AVE TO SOUTH AVE Length: 2.90
TIP#: CL-162

Project: 0004638 Type Work: Curt>& Gutter

Descp: ANVILBLOCK ROAD FROM BOULDERCREST ROAD

TO ALLEN ROAD

Length: 1.32

TlP#: CL-230B

Project: 0006401 Type Work: ATMS/ITS

Descp: ATMS/I-75 S RAMP METERS-HAR FM HUDSON BR

TO CLEVELAND AVE

Length: 17.35

TlP#: AR-443

Project: 0006642 Type Work: Multi-use Trail Descp: MORROWS PATH SYSTEM - PHASE I

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 0006695 Type Work: Preliminary Engineering Descp: FOREST PARK - ATl STATE FARMERS MARKET
TRANSPORTATION STUDY Length: 0.00
TIP#: CL-244

Project: 0006793 Type Work: Bicycle/Ped. Facility

Descp: SR 54/JONESBORO RD - BIKE/PED UNDERPASS &

CROSSWALKS

Length: 0.00

TIP#: CL-AR-BP09

Phase Fund PE Local CST STP

Year LOCL LUMP

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

Local

CST Local

Year lOCL lOCL

Phase Fund PE Local CST CMAQ

Year LOCL 2005

Phase Fund PE Local CST CMAQ

Year lOCL 2005

Phase Fund PE Local CST STP

Year LOCL 2006

Phase Fund PE Bond ROW Bond CST Bond

Year Underway
2005 2006

Phase Fund PE NHS CST Bond

Year 2006 2007

Phase Fund CST STP

Year LUMP

Phase Fund PE H170

Year 2005

Phase Fund PE local CST STP

Year LOCL 2006

Federal $0
$920,000

State $0
$230,000

Federal
$0 $1,600,000
Federal $0 $0

State
$0 $0
State $0 $0

Federal $0
$688,000

State $0 $0

Federal $0
$332,000

State $0 $0

Federal $0
$1,041,600

State $0 $0

Federal
$0 $0

State
$200,000 $1,585,000

Federal $20,000 $0

State $5,000
$1,500,000

Federal $625,600

State $0

Federal $400,000

State $0

Federal $0
$2,200,000

State $0 $0

Other $150,000
$0
Other $0
$400,000
Other $30,000 $300,000
Other $140,000 $172,000
Other $85,000 $83,000
Other $260,500 $260,400
Other $0 $0
Other $0 $0
Other $156,400
Other $100,000
Other $200,000 $550,000

Total $150,000 $1,150,000
Total $0
$2,000,000
Total $30,000
$300,000
Total $140,000 $860,000
Total $85,000 $415,000
Total $260,500 $1,302,000
Total $200,000 $1,585,000
Total $25,000 $1,500,000
Total $782,000
Total $500,000
Total $200,000 $2,750,000

Page 77 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM ZaJZQQ5

Clayton

Project: 0007144 Type Work: Parking Areas

Descp: JONESBORO DOWNTOWN COMMUTER PARKING

DECK

Length: 0.00

TIP#: CL-246

Project: 322050 Type Work: Widening

Descp: SR 42 FM SR 138/STOCK'GE TO 1-675 NB

RAMPSI&CLVERT Lanes: Exist. 2 Prop. 4

Length: 2.30

TIP#: CL-064

Project: 342970. Type Work: Widening

Descp: SR 920 FM SR 3/US 19-41/CLAYTON TO 1-75IN

HENRY {REL SR 81)

Lanes: Exist. 2 Prop. 4

Length: 3.59

TlP#: HE-liS

Project: 712602- Type Work: Bridges Descp: LEE STREET IN MORROW OVER 1-75

Lanes: Exist. 0 Prop. 2

Length: 0.08 TlP#: CL-OS9

Project: 712630. Type Work: Interchange

Descp: 1-75 FM MT ZION BLVD TO OLD DIXIE(BRIDGES)&

SR 54 INTERCH

Length: 2.40

TlP#: CL-AR-031

Project: 713372. Type Work: ATMSIITS Descp: ATMS/I-285 SURVEIL FM I-B5/UNION CITY-FULTN E
TO 1-75/CLAYTN Length: 4.11
TlP#: AR-469

Project: 714095- Type Work: ATMS/ITS

Descp: ATMS/I-675 COMM/SURVEIL FM 175/HENRY TO

1-285/DEKALB

Length: 10.32

TIP#: AR-433A&B

Project: 720815. Type Work: Widening

Descp: SR 42 FM LAKE HARBIN RD N TO ANVIL BLOCK

RD

Lanes: Exist. 2 Prop. 4

Length: 3.20

TlP#: CLOI2

Project: 721290. Type Work: Widening

Descp: SR 85 FM SR 279/FAYETTE N TO 6-LN @

ROBERTS DRiCLAYTON

Lanes: Exist. 4 Prop. 6

Length: 4.00

TlP#: CLOIS

Project: 721440. Type Work: Widening

Descp: SR 54 FM MCDONOUGH RD/FAYETT NE TO SR

3/US 19/41/CLAYTON CO

Lanes: Exist. 2 Prop. 4

Length: 7.16

TlP#: CL-04IB

Project: 721480. Type Work: Widening

Descp: SR 138 FM WALT STEPHENS RD/CLAYTON EAST

TO 1-75/HENRY CO

Lanes: Exist. 2 Prop. 4

Length: 4.27

TIP#: CL-031

Phase Fund PE STP ROW Local CST Local

Year 2005 LOCL LOCL

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year 2006 After 2007 After 2007

Phase Fund

PE

NHS

CST NHS

Year Underway
2006

Federal $400,000
$0 $0
Federal $1,889,600
Federal $1,200,000
Federal $1,088,000

State $0 $0 $0

Other $100,000 $280,000 $5,000,000

State $0

Other $472,400

State $300,000

Other $0

State $272,000

Other $0

Phase Fund PE NHS ROW NHS CST Bond

Year Underway
2006 2007

Phase Fund PE NHS CST NHS

Year 2005 2006

Federal

State

$1,264,800 $0

$316,200 $15,139,000

Federal $120,000 $3,361,600

State $30,000 $840,400

Other
$0 $0
Other $0 $0

Phase Fund

PE

NHS

CST Bond

Year 2006 2007

Federal $120,000
$0

State $300,000 $16,493,000

Other $0 $0

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Federal $1,458,400

State $364,600

Other $0

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Federal $1,920,000

State $0

Other $480,000

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Federal $4,006,400

State $1,001,600

Other $0

Phase Fund PE NHS ROW NHS CST NHS

Year Underway Underway
2005

Federal

State

$10,632,000 $2,658,000

Other $0

Total
$500,000
$280,000
$5,000,000 Total
$2,362,000
Total $1,500,000 Total
$1,360,000
Total
$1,581,000 $15,139,000
Total $150,000
$4,202,000
Total $420,000
$16,493,000
Total $1,823,000 Total $2,400,000 Total
$5,008,000
Total $13,290,000 Page 78of 300



STATE TRANSPORTA TJONIMPROVEMENT PROGRAM W/ZQQ5

Clayton

Project: 731520. Type Work: Replace Bridge

Descp: SR 3/US 19 @ CEN OF GA RAILROAD .35 MI S OF

JCT 1-285

Length: 0.38

TIP#: CL-095

Project: 731885. Type Work: Signals Descp: SR 85 FM SR331 TO POINTE SOUTH PKWY &
SR138 FM SR85 TO NAVE Length: 6.62
TlP#: CL-235

Project: 742870. Type Work: Widening

Descp: SR 920 FROM SR 54 TO SR 3/US 19 (REL SR 81)&

FAYETTE Lanes: Exist. 2 Prop. 4

Length: 5.73

TlP#: CL-IOI

Project: 751790- Type Work: Widening

Descp: PANOLA RD FM BOULDERCREST RD TO

STAGECOACH RD Lanes: Exist. 2 Prop. 4

Length: 1.07

TIP#: CL-239

Project: 751810. Type Work: Widening

Descp: FLINT RIVER RD FM GLENWOODS DR TO

KENDRICKRD Lanes: Exist. 2 Prop. 4

Length: 1.07

TlP#: CL-020

Project: 752180. Type Work: Widening

Descp: CONLEY RD (AVIATION BLVD EXT) FM OLD DIXIE

HWY/SR 3 TO SR 54 Lanes: Exist. 2 Prop. 4

Length: 1.20

TlP#: CL-074

Project: 753010 Type Work: Replace Bridge

Descp: CR 1351/REX ROAD@ BIG COTTON INDIAN

CREEK IN REX

Length: 0.75

TlP#: CL-234A2&

Project: 753020 Type Work: Sidewalks Descp: CONLEY RD/CR 171 FM SR 54 TO CHEROKEE
TRAILIADD CURB/GUTTER Length: 2.73
TIP#: CL-231
Project: 770321 Type Work: Rail Projects Descp: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON)
PHASE 2 Length: 0.00
TIP#: AR-268B

Project: 771210 Type Work: Widening Descp: ANVILBLOCK RD FM 5 LANE TO BOULDERCREST

Lanes: Exist. 2 Prop. 4

Length: 1.50 TIP#: CL-230A

Project: TOO0585 Type Work: Transit Projects Descp: FY 2005 CLAYTON COUNTY SECTION 5307

Length: 0.00 TlP#: AR-CL5307

Phase Fund PE Bridge ROW Bridge ROW Bridge ROW Bridge CST Bridge Phase Fund PE Local CST STP

Year Underway Underway Underway
2005 2006 Year LOCL 2005

Federal

State

$4,488,000 $2,972,800
Federal $0
$1,099,200

$1,122,000 $743,200 State $0 $274,800

Phase Fund PE STP ROW STP CST STP

Year 2006 After 2007 After 2007

Federal $1,000,000

State $250,000

Phase Fund PE STP ROW Local CST STP

Year 2006 LOCL After 2007

Federal $4,000 $0

State $1,000 $0

Phase Fund PE Bond PE STP ROW Bond CST Bond
Phase Fund PE STP ROW STP ROW Bond CST Bond
Phase Fund PE Bridge ROW Bond CST Bridge CST STP
Phase Fund PE Bond ROW Bond CST Bond

Year Underway Underway
2005 2006
Year Underway After 2007
2007 After 2007
Year Underway Underway After 2007 After 2007
Year Underway
2005 2007

Federal

State

$0 $0
Federal

$400,000 $2,200,000
State

$0 $5,150,000

Federal

State

Federal
$0 $0

State
$400,000 $2,050,000

Phase Fund CST NHS

Year 2005

Federal $7,728,000

State $1,932,000

Phase PE ROW CST

Fund Bond Bond Bond

Year Underway
2005 2006

Phase Fund CST Transit

Year 2005

Federal
$0 $0

State
$200,000 $1,585,000

Federal $1,306,255

State $60,000

Other
$0 $0 Other $0 $0
Other $0
Other $0 $0
Other
$0 $0 Other
$0 Other
Other $0 $0
Other $0
Other $0 $0
Other $60,000

Total
$5,610,000 $3,716,000
Total $0
$1,374,000
Total $1,250,000
Total $5,000 $0
Total
$400,000 $2,200,000
Total
$5,150,000 Total
Total $400,000 $2,050,000 Total $9,660,000
Total $200,000 $1,585,000 Total $1,426,255

Page 79 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM Za12QQ5

Clayton

Project: T000592 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR CLAYTON

COUNTY

Length: 0.00

TIP#: AR-CL-5310

Project: T000933 Type Work: Transit Projects Descp: FY 2006 CLAYTON COUNTY SECTION 5307

Length: 0.00 TlP#:

Project: T000989 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR CLAYTON

COUNTY

Length: 0.00

TIP#:

Project: T001272 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR CLAYTON
COUNTY Length: 0.00
TIP#:

Project: T001384 Type Work: Rail Projects Descp: COMMUTER RAIL ATLANTNLOVEJOY
(OPERATIONS ASSISTANCE) Length: 0.00
TlP#: AR-168F

Phase Fund CST Transit

Year 2005

Federal $36,610

State $9,152

Other $0

Phase Fund CST Transit

Year 2006

Federal $604,800

State $67,200

Other $84,000

Phase Fund CST Transit

Year 2006

Federal $38,440

State $9,610

Other $0

Phase Fund CST Transit

Year 2007

Federal $40,632

State $10,090

Other $0

Phase Fund CST CMAQ

Year 2006

Federal $5,500,000

State $0

Other $1,375,000

Total
$45,762
Total
$756,000
Total
$48,050
Total
$50,722
Total
$6,875,000
Page 80 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zaJZQQ5

Clinch

Project: 0002274 Type Work: Streetscapes Descp: HOMERVILLE CENTRAL BUSINESS DISTRICT
STREETSCAPE Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006534 Type Work: Historic Facilities

Descp: RESTORATION OF RAILROAD DEPOT - ROOF

REPAIR ONLY

Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund CST STP

Year LUMP

Federal $650.000

State $0

Phase Fund CST STP

Year LUMP

Federal $100.000

State $0

Other $162.500
Other $25.000

Total $812.500
Total $125.000

Page 81 of 300

STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 2aJ2QQ5

Cobb
Project: 0000555 Type Work: Turn Lanes Descp: CHASTAIN RD @ BELLS FERRY RD/CR 2845

Length: 0.20 TlP#: CO-313

Project: 0000629 Type Work: Sidewalks

Descp: ROSWELL RD SIDEWALKS FM MANOR CREST CT

TO INDIAN HILLS PK

Length: 1.06

TlP#: CO-AR-BPJ9

Project: 0000630 Type Work: Bicycle/Ped. Facility

Descp: AUSTELL STREETSCAPE IMPROVEMENTS - 3

STREETS

Length: 0.00

TlP#: CO-AR-BP20

Project: 0001239 Type Work: Intersection Improvement

Descp: SR 360 AT CR 809/CORNER RD; CR 2083 AND CR

811IBULLARD RD

Length: 0.87

LUMP SUM PROJECT

TlP#: AR-157

Project: 0001758 Type Work: HOV Lanes

Descp: 1-285 FM 1-75/COBB THRU FULTON TO

1-85/DEKALB FOR HOV

Lanes: Exist. 10 Prop. 12

Length: 13.12

TlP#: AR-H-300A

Project: 0001760 Type Work: HOV Lanes

Descp: 1-20 FM SR 6/DOUGLAS THRU COBB TO SR

280/FUL TON - HOV LANES

Lanes: Exist. B Prop. 10

Length: 8.06

TIP#: AR-H-200

Project: 0002277 Type Work: Bicycle/Ped. Facility Descp: CONCORD ROAD LINEAR PARK

LUMP SUM PROJECT

Length: 0.00 TlP#: AR 384 ABC

Project: 0002850 Type Work: Sidewalks
Descp: ROSWELL STREET STREETSCAPES IN MARIETTA (LCI PROJECT) Length: 1.59

LUMP SUM PROJECT

TIP#: CO-AR283

Project: 0003041 Type Work: HOV Lanes Descp: 1-75N AT 1-285INTERCHANGE RECONSTRUCTION
FOR HOV LANES Length: 0.50
TlP#: AR-H-90JA

Project: 0003511 Type Work: Transit Projects Descp: GRTA NW CORRIDOR TRANSIT - GO.

Length: 0.00 TlP#: AR-25ID
Project: 0003512 Type Work: Transit Projects Descp: GRTA NW CORRIDOR TRANSIT - G.O.

Length: 0.00 TlP#: AR-25IB

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL 2006

Phase PE ROW CST

Fund Local Local STP

Year LOCL LOCL Underway

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL 2005

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund

PE

Bond

PE

NHS

PE

NHS

PE

NHS

ROW Bond

CST NHS

Phase Fund

PE

NHS

ROW NHS

CST Bond

Year After 2007 Underway
2006 2007 After 2007 After 2007 Year Underway 2006 After 2007

Phase Fund CST STP

Year LUMP

Phase PE ROW CST

Fund STP STP STP

Year Underway
LUMP LUMP

Phase Fund

PE

NHS

PE

NHS

PE

NHS

CST Bond

Phase Fund ROW Bond CST Bond

Year 2005 After 2007 After 2007 After 2007
Year 2007 After 2007

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year 2005 2006 After 2007

Federal
$0 $200,000
Federal $0 $0

State
$0 $0

Other
$50,000 $50,000

State $0 $0

Other $100,000
$60,000

Federal $0 $0
$1,250,400
Federal
$1,215,000 $459,000
Federal

State $0 $0 $0

Other $156,000
$50,000 $312,600

State
$135,000 $51,000

Other
$0 $0

State

Other

$4,000,000 $1,000,000

$0

$4,000,000 $1,000,000

$0

Federal $5,000,000

State $1,250,000

Other $0

Federal $500,000

State $0

Other $125,000

Federal
$181,760 $5,241,600

State

Other

$0

$45,440

$0 $1,310,400

Federal $4,000,000

State $1,000,000

Other $0

Federal $0

State $70,200,000

Other $0

Federal $0 $0

State $30,000,000 $32,100,000

Other $0 $0

Total
$50,000
$250,000 Total
$100,000
$60,000
Total
$156,000
$50,000
$1,563,000
Total
$1,350,000 $510,000
Total $5,000,000
$5,000,000
Total
$6,250,000
Total
$625,000
Total $227,200
$6,552,000 Total
$5,000,000
Total
$70,200,000
Total
$30,000,000
$32,100,000 Page 82of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5

Cobb
Project: 0003532 Type Work: Transit Projects Descp: NORTHWEST CORRIDOR TRANSIT - GRVA

Length: 0.00 TlPII. AR-25IB&C

Project: 0003534 Type Work: Transit Projects

Descp: 1-285FROM CUMBERLAND TO PERIMETER

CENTER TRANSIT

Length: 9.37

TlPII: AR-900C

Project: 0004403 Type Work: Interchange Descp: SR 120 AT SR 120 LOOP (EAST)

Length: 0.20
TlPII: CO-289
Project: 0004404 Type Work: Intersection Improvement Descp: SR 176/LOST MTN/MARS HILL@8 INTERSECTIONS
BT CORNER&COBB PKY Length: 1.60
TlPII: CO-325
Project: 0004405 Type Work: Intersection Improvement Descp: SR 5/AUSTELL AT 11 INTERSECTIONS BTWN
SANDTOWN & HOSPITAL SO Length: 4.54
TIPII: CO-326
Project: 0004446 Type Work: Realignment Descp: LEWIS RD FM SR 6/CH JAMES PKWY TO SR 6
BU/NEW S sa IPE-LCI]
Length: 1.30
TIPII: CO-3\2&B

Project: 0004447 Type Work: Intersection Improvement Descp: SR 120IDALLAS ROAD AT RIDGEWAY ROAD

Length: 1.65 TlPII: CO-32 \

Project: 0004448 Type Work: Intersection Improvement

Descp: SR 120/ROSWELL ROAD AT JOHNSON FERRY

ROAD

Length: 1.43

TIPII: CO-322

Project: 0004449 Type Work: Intersection Improvement Descp: SR 360/POWDER SPRINGS ROAD AT CHEATHAM
HILUCALLAWAY ROADS Length: 0.87
TlPII: CO-323

Project: 0004473 Type Work: Landscaping
Descp: COBB GALLERIA PKWY FM AKERS MILL TO
CUMBERLAND PKWY FY04 LCI Length: 0.00

LUMP SUM PROJECT

TlPII: CO AR 286

Project: 0004474 Type Work: Bicycle/Ped. Facility Descp: DOWNTOWN ACWORTH PEDESTRIAN CORRIDOR
IMPROVEMENTS FY 04 LCI Length: 0.00

LUMP SUM PROJECT

TIPII: CO AR 287

Phase CST CST CST

Fund Bond Bond Bond

Year After 2007 After 2007 After 2007

Phase Fund PE NHS ROW Bond CST Bond CST Bond
Phase Fund PE Bond ROW Bond CST Bond

Year 2007 After 2007 After 2007 After 2007
Year Underway
2005 2006

Phase Fund PE Bond ROW Bond CST Bond

Year Underway
2005 2006

Phase PE ROW CST

Fund Bond Bond Bond

Year Underway
2005 2006

Phase Fund

PE

STP

ROW Local

CST STP

CST STP

Phase Fund

PE

Local

ROW Local

CST STP

Year Underway
LOCL 2006 2006
Year LOCL LOCL 2005

Phase Fund

PE

Local

CST STP

Year LOCL 2005

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL 2005

Phase Fund PE STP CST STP

Year Underway
LUMP

Phase Fund CST STP

Year LUMP

Federal

State

Other

Federal $3,200,000

State $800,000

Other $0

Federal
$0 $0

State
$700,000 $5,600,000

Other
$0 $0

Federal
$0 $0

State
$600,000 $4,300,000

Other
$0 $0

Federal
$0 $0

State
$400,000 $3,200,000

Other
$0 $0

Federal
$0 $6,400,000 $2,960,000
Federal $0 $0
$72,000

State

Other

$0 $0 $740,000
State $0 $0 $0

$2,000,000 $1,600,000
$0
Other $10,000 $20.000 $18,000

Federal $0
$64,000

State $0
$16,000

Other $10,000
$0

Federal $0 $0
$981,275
Federal
$1,680,000

State $0 $0
$245,319

Other $97,533 $100,000
$0

State $0

Other $415,800

Federat $217,400

State $0

Other $54.350

Total
Total $4,000,000
Total $700,000 $5,600,000
Total $600,000 $4,300,000
Total $400,000 $3,200,000
Total $2,000,000 $8,000,000 $3,700,000
Total $10.000 $20.000 $90.000
Total $10,000 $80,000
Total $97,533
$100,000 $1.226,594
Total $2.095.800
Total $271,750

Page 83 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Cobb
Project: 0004504 Type Work: Bicycle/Ped. Facility Descp: VETERANS MEMORIAL HIGHWAY FM THORNTON
RD/SR 6 TO ROSEHILL ST Length: 1.00
TIP#: COARBPJ8
Project: 0004505 Type Work: Bicycle/Ped. Facility Descp: ROnENWOOD CREEK TRAIL FM PACES MILL
NPS TO TERRELL MILL RD Length: 4.40
TlP#: COARBPJ9
Project: 0004506 Type Work: Bicycle/Ped. Facility Descp: SILVER COMET TRL EXT FM MAVELL RD TO
SPRING HILL PKY PHASE 1 Length: 2.44
TlP#: COARBP20
Project: 0004507 Type Work: Bicycle/Ped. Facility Descp: SILVER COMET TRL FM SPRING HILL PKWY TO
MT WILKINSON PHASE 2 Length: 0.00
TlP#: CO-AR-BP20
Project: 0004508 Type Work: Bicycle/Ped. Facility Descp: SR 120/DALLAS HIGHWAY FM JOHN WARD RD TO
PAULDING COUNTY LN Length: 7.06
TlP#: CO-ARBP21
Project: 0004509 Type Work: Bicycle/Ped. Facility Descp: KENNESAW RAILROAD UNDERPASS AT SOUTH
OF CHEROKEE STREET Length: 0.00
TlP#: CO-AR-BP21
Project: 0004510 Type Work: Bicycle/Ped. Facility Descp: FLOYD ROAD FM US 78/278 VETERANS
MEMORIAL HIGHWY TO HICKS RD Length: 1.55
TlP#: COAR-BP2J
Project: 0004511 Type Work: Bicycle/Ped. Facility Descp: NOONDAY CREEK TRAIL FM US 41/COBB
PARKWAY TO BELLS FERRY RD Length: 0.00
TlP#: CO-AR-BP21
Project: 0005653 Type Work: ATMS/ITS Descp: ATMS ENHANCEMENT PHASE 4

Length: 0.00 TlP#: CO-2760

Project: 0005788 Type Work: Intersection Improvement
Descp: SR 5 SPUR @ CR 2907/SANDY PLAINS RD 0.90 MI EAST OF 1-75 Length: 0.25

LUMP SUM PROJECT

TlP#: Lump

Project: 0006012 Type Work: Intersection Improvement Descp: SR 5 CO/BARREn PKWY AT CR 175/COBB PLACE
BLVD Length: 0.29

LUMP SUM PROJECT

TlP#: LUMP

Phase Fund

PE

Local

CST CMAQ

Year LOCL 2005

Phase Fund PE Local ROW Local CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL 2007

Phase Fund

PE

Local

ROW Local

CST H170

CST STP

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005 2005
Year LOCL LOCL 2005

Phase Fund PE CMAQ ROW CMAQ CST CMAQ

Year 2005 2006 After 2007

Phase Fund CST STP

Year 2005

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Federal $0
$352,000
Federal $0 $0
$3,000,000
Federal $0 $0
$1,708,000
Federal $0 $0
$1,708,000
Federal $0 $0
$2,000.000
Federal $0 $0
$400,000 $1,360,000
Federal $0 $0
$718,080
Federal $310,400 $310,400
Federal $2,480,000
Federal
$274,500
Federal $0 $0
$491,400

State $0 $0
State $0 $0 $0
State $0 $0 $0
State $0 $0 $0
State $0 $0 $0
Slale $0 $0 $0 $0
State $0 $0 $0
Slate $0 $0
Slale $0
Slate
$30,500
Slale $0 $0
$54.600

Other $44,000 $88,000
Other $750,000 $750,000 $750,000
Other $213,500 $213,500 $427,000
Other $0 $0
$427,000
Other $0 $0
$500,000
Other $0 $0
$100,000 $340,000
Other $0 $0
$179,520
Other $77,600 $77,600
Other $620,000
Other
$0
Other $0
$138,000 $0

Total $44,000 $440,000
Total $750,000 $750,000 $3,750.000
Total $213,500 $213.500 $2,135.000
Total $0 $0
$2.135,000
Total $0 $0
$2,500,000
Total $0 $0
$500.000 $1,700.000
Tolal $0 $0
$897,600
Total $388.000 $388,000
Tolal $3,100,000
Total
$305,000
Total $0
$138,000 $546,000
Page 84 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Cobb

Project: 0006049 Type Work: Widening

Descp: SR 360 FM SR 176/NEW MACLAND ROAD TO SR

120/PAULDING COUNTY

Lanes: Exist. 2 Prop. 4

Length: 5.80

TlP#: CO-367

Project: 0006262 Type Work: Parking Areas
Descp: PARKING & PAVING AROUND SEN RUSSELL SQ&NEW CITY HALL - LCI Length: 0.00

LUMP SUM PROJECT

TIP#: CO-AR 292

Project: 0006264 Type Work: Park & Ride Lot

Descp: PARK & RIDE LOT AT FLOYD ROAD AND CLAY

ROAD - LCI PROJECT

Length: 0.40

LUMP SUM PROJECT

TIP#: CO-AR 295

Project: 0006269 Type Work: Sidewalks
Descp: AKERS MILL FM CUMBERLAND BLVD TO CHATTAHOOCHEE NRA - LCI Length: 0.66

LUMP SUM PROJECT

TlP#: CO-AR-291

Project: 0006295 Type Work: Intersection Improvement
Descp: 1-285INTERCHANGE @ SR 280/S0UTH COBB DRIVE Length: 0.80

LUMP SUM PROJECT

TIP#:

Project: 0006325 Type Work: Replace Bridge

Descp: CR 17821CONCORD ROAD OVER SILVER COMET

TRAIL

Length: 0.40

TIP#: CO-369

Project: 0006334 Type Work: ATMS/ITS Descp: ATMS/I-75 N COMMUNIC/SURVEILANCE FM WADE
GREEN RD TO SR 92 Length: 4.28
TIP#: AR-432

Project: 0006396 Type Work: ATMS/ITS Descp: ATMS/I-75 N RAMP METERS-HAR FROM 1-85TO
WADE GREEN ROAD Length: 8.02
TlP#: AR-438

Project: 0006400 Type Work: ATMS/ITS Descp: ATMS/I-285 S RAMP METERS-HAR FM SR 280 TO
COBB PKWY/US 41 Length: 4.31
TIP#: AR-442

Project: 0006402 Type Work: ATMS/ITS Descp: ATMS/I-20 RAMP METERS-HAR FM THORNTON
RD TO EVANS MILL RD Length: 30.30
TlP#: AR-444

Project: 0006417 Type Work: HOV Lanes

Descp: 1-75FM BANBERRY ROAD TO ALLGOOD ROAD

HOV INTERCHANGE

Lanes: Exist. 8 Prop. 10

Length: 2.31

T/P#: AR-H-002

Phase Fund PE STP ROW STP CST STP

Year 2005 After 2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase Fund PE STP CST STP

Year Underway
LUMP

Phase Fund

PE

1M

ROW 1M

CST 1M

Year Underway
LUMP LUMP

Phase Fund PE Bridge ROW Local CST Bridge

Year 2005 LOCL After 2007

Phase Fund PE NHS CST NHS

Year 2005 2006

Phase Fund PE NHS CST Bond

Year 2005 2006

Phase Fund PE NHS CST Bond

Year 2006 2007

Phase Fund PE NHS CST Bond

Year 2006 2007

Phase Fund PE NHS ROW Bond ROW Bond CST Bond

Year 2006 After 2007 After 2007 After 2007

Federal $1,440,000

State $360,000

Federal $40,000
$243,200
Federal $400,000 $320,000
Federal $2,175,200

State $0 $0
State $0 $0
State $0

Federal
$135,000 $1,256,400
Federal $63,360 $0

State
$15,000 $139,600
State $0 $0

Federal $120,000 $4,000,000

State $30,000 $1,000,000

Federal $28,000 $0

State $7,000
$2,000,000

Federal $20,000 $0

State $5,000
$750,000

Federal $32,000 $0

State $8,000
$2,500,000

Federal $9,600,000

State $2,400,000

Other $0
Other $10,000 $60,800
Other $100,000
$80,000
Other $543,800
Other $0 $0
Other $15,840 $100,000
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0

Total $1,800,000
Total $50,000 $304,000
Total $500,000 $400,000
Total $2,719,000
Total $150,000 $1,396,000
Total $79,200 $100,000
Total $150,000 $5,000,000
Total $35,000 $2,000,000
Total $25,000
$750,000
Total $40,000 $2,500,000
Total $12,000,000

Page 85 of 300

STATE TRANSPORTATlON IMPROVEMENT PROGRAM
za12QQ5

Cobb

Project: 0006418 Type Work: HOV Lanes

Descp: 1-75 FM ALLGOOD ROAD TO 1-575 HOV

INTERCHANGE Lanes: Exist. 8 Prop. 10

Length: 3.73

TlP#: AR-H-003A

Project: 0006428 Type Work: Transit Projects

Descp: 1-285 FROM CUMBERLAND TO PERIMETER

TRANSIT CORRIDOR

Length: 9.91

TIP#:

Project: 0006429 Type Work: Transit Projects Descp: 1-285 FROM CUMBERLAND TO PERIMETER
TRANSIT CORRIDOR Length: 0.00
TIP#:

Project: 0006578 Type Work: Landscaping

Descp: 1-285@ US 41/COBB PARKWAY INTERCHANGE

BEAUTIFICATION

Length: 0040

LUMP SUM PROJECT

TIP#:

Project: 0006579 Type Work: Sidewalks
Descp: SCHOOL ORIENTED SIDEWALKS - MULTIPLE AREAS Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006580 Type Work: Transportation museums Descp: RAILROAD EDUCATION CENTER - SOUTHERN
MUSEUM OF CIVIL WAR Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006581 Type Work: Multi-use Trail Descp: ACWORTH MULTI-USE TRAIL SYSTEM PHASE I

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006622 Type Work: Multi-use Trail Descp: SWEETWATER CREEK GREENWAY & TRAIL

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006723 Type Work: Bicycle/Ped. Facility Descp: SR 360/POWDER SPRINGS FM GARRISON RD TO
COUNTY SERVICES PKWY Length: 2.13
TIP#: CO-AR-BP21
Project: 0006755 Type Work: Special Studies Descp: SR 6/CAMP CREEK PKWY FM 1-85TO W HIRAM
PKWY- CORRIDOR STUDY Length: 29.07
TlP#: AR-465
Project: 0006794 Type Work: ATMS/ITS Descp: ADVANCED TRANSPORTATION MANAGEMENT-
PHASE V Length: 0.00
TIP#: CO-333

Phase Fund PE NHS ROW Bond CST NHS

Year 2007 After 2007 After 2007

Phase Fund PE Bond PE Bond ROW Bond CST Bond

Phase Fund

PE

Bond

CST Bond

Year 2005 2006 After 2007 After 2007
Year 2007 After 2007

Federal $6,400,000

State $1,600,000

Federal $0 $0

State $5,000,000 $20,000,000

Federal $0

State $11,000,000

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase Fund CST STP

Year LUMP

Federal $800,000

State $0

Phase Fund CST STP

Year LUMP

Federal $400,000

State $0

Phase Fund CST STP

Year LUMP

Federal $700,000

State $0

Phase Fund CST STP

Year LUMP

Federal $350,400

State $0

Phase Fund

PE

Local

CST STP

Year LOCL 2007

Federal $0
$1,014,000

State $0 $0

Phase Fund CST STP

Year 2006

Federal $600,000

State $0

Phase Fund CST CMAQ

Year 2006

Federal $1,870,000

State $0

Other $0
Other $0 $0
Other $0
Other $125,000
Other $200,000
Other $100,000
Other $175,000
Other $87,600
Other $160,000 $253,500
Other $150,000
Other $467,500

Total
$8,000,000
Total
$5,000,000
$20,000,000
Total
$11,000,000
Total
$625,000 Total
$1,000,000
Total $500,000
Total
$875,000 Total $438,000 Total $160,000
$1,267,500
Total $750,000 Total
$2,337,500
Page 86of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM zatZQQ5

Cobb

Project: 0006795 Type Work: ATMS/ITS

Descp: ADVANCED TRANSPORTATION MANAGEMENT-

PHASE IX

Length: 0.00

TIP#: CO-334

Project: 0006797 Type Work: Signals Descp: TRAFFIC SIGNAL RETIMING - FY 2006

Length: 0.00 TlP#: CO-335B
Project: 0006798 Type Work: Signals Descp: TRAFFIC SIGNAL RETIMING - FY 2007

Length: 0.00 TIP#: CO-335C
Project: 0006799 Type Work: ATMS/ITS DesclF ITS INTEGRATION

Length: 0.00 TIP#: CO-AR-289A
Project: 0006801 Type Work: Transit Projects Descp: CCT - SIXTEEN CLEAN FUEL
EXPANSION/REPLACEMENT BUSES Length: 0.00 TIP#: CO-AR-300
Project: 0006802 Type Work: Transit Projects Descp: CCT - AUTOMATION OF FUNCTIONS

Length: 0.00
TlP#: CO-AR-301
Project: 0006803 Type Work: Bicycle/Ped. Facility Descp: SOUTH HURT RD FM RUSSELL ELEM TO
CONCORD RD & MAVELL RD Length: 1.27 TlP#: CO-AR-BP21
Project: 0006804 Type Work: Multi-use Trail Descp: MARIETIA MULTI-USE TRAIL - FY 2008

Length: 0.00 TIP#: CO-AR-BP21
Project: 0006805 Type Work: Sidewalks Descp: LOWER ROSWELL ROAD

Length: 14.95 TlP#: CO-AR-BP22

Project: 0006867 Type Worle Intersection Improvement

Descp: SR 5/CHURCH/CHEROKEE STREET @ TOWER

ROAD

Length: 0.40

TIP#: CO-330

Project: 0006873 Type Work: Multi-use Trail

Descp: KENNESAW MOUNTAIN TO CHATIAHOOCHEE

RIVER TRAIL

Length: 0.00

TlP#: CO-AR-BPI2

Phase Fund CST CMAQ

Year 2007

Phase Fund CST CMAQ

Year 2007

Phase Fund CST CMAQ

Year Atter 2007

Phase Fund CST STP

Year 2007

Phase Fund CST STP

Year 2006

Phase Fund CST CMAQ

Year 2006

Phase Fund CST CMAQ

Year 2006

Phase Fund CST STP

Year 2007

Phase Fund CST CMAQ

Year 2007

Phase Fund

PE

Local

ROW Local

CST STP

Phase Fund

PE

Local

ROW STP

CST STP

Year LOCL LOCL 2007
Year LOCL 2006 2007

Federal $1,870,000
Federal $320,000
Federal
Federal $1,000,000
Federal $4,880,000
Federal $1,200,000
Federal $1.376,000
Federal $662,400
Federal $90,400
Federal $0 $0
$2.280.000 Federal $0 $160.000
$2,000,000

State $0

Other $467,500

State $0

Other $80,000

State

Other

State $0

Other $250,000

State $0

Other $1.220.000

State $0

Other $300,000

State $0

Other $344.000

State $0

Other $165,600

State $0

Other $22.600

State $0 $0 $0

Other $150.000 $1,200,000 $570,000

State $0 $0 $0

Other $300,000
$40,000 $500,000

Total $2,337,500
Total $400,000
Total
Total $1,250,000
Total $6.100.000
Total $1.500,000
Total $1,720.000
Total $828.000
Total $113,000
Total $150,000 $1,200.000 $2.850.000 Total $300.000 $200.000 $2,500,000

Page 87 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Cobb
Project: 0006875 Type Work: Sidewalks Descp: CCT - SUPPORTIVE SIDEWALKS - 2008

Phase Fund CST CMAQ

Length: 0.00 TlP#: CO-AR-BP21

Project: 0007094 Type Work: Park & Ride Lot Descp: GALLERIA PARK AND RIDE LOT

Phase Fund CST Bond

Length: 0.00 TlP#: CO-AR-303

Project: 0007132 Type Work: Miscellaneous Improvement

Descp: CR 2373/FLOYD RD FM SR 8/US 78/US 278 TO CR

28941HICKS RD

Length: 1.55

TlP#: CO-337

Project: 713370. Type Work: ATMS/ITS

Descp: ATMS/I285 SURVEIL FM 1-20W IN FUL TN N TO

175 IN COBB

Length: 6.57

TlP#: AR279

Project: 713405. Type Work: ATMS/ITS Descp: ATMS/I-285 RAMP METERS-HAR FM 1-75 IN COBB
E TO 1-85 IN DEK Length: 13.17
TIP#: AR-24 I

Project: 713620. Type Work: Widening

Descp: 1-20 FM SR 6ITHORNTON RD/DOUGLAS TO

FULTON INDUST BLVD/FULTO

Lanes: EXist. 6 Prop. 8

Length: 4.94

TlP#: DO-AR-057

Project: 714080. Type Work: ATMSIITS Descp: ATMS/I-20 COMM/SURVEI FM SR 6ITHORNTON
RD TO 1-285/FULTON Length: 5.99
TIP#: AR-447

Project: 714090. Type Work: ATMSIITS Descp: ATMS: 1-575 COMM/SURVEILLANCE FM 1-75/COBB
TO SR 921CHEROKEE Length: 8.58
TIP#: AR-341

Project: 714130. Type Work: HOV Lanes

Descp: 1-75 FM AKERS MILL RD TO BANBERRY ROAD

FOR HOV LANES

Lanes: Exist. 8 Prop. 10

Length: 5.14

TlP#: AR-H-OOI

Project: 721152. Type Work: Widening

Descp: SR 3IUS 41/COBB PKWY FM PACES MILL RD TO

AKERS MILL ROAD

Lanes: Exist. 4 Prop. 8

Length: 0.84

TlP#: CO-23I

Project: 721310- Type Work: Widening

Descp: SR 120/ROSWELL RD FM SR 120LP TO

BRIDGEGATE DR

Lanes: Exist. 4 Prop. 6

Length: 1.43

TlP#: CO-I 77

Phase Fund

PE

Local

ROW Local

CST H170

Phase Fund

PE

STP

CST Bond

Phase Fund

PE

NHS

CST NHS

Phase Fund

PE

NHS

ROW NHS

CST NHS

Phase Fund

PE

NHS

CST NHS

Phase Fund

PE

NHS

PE

NHS

CST NHS

Phase Fund

PE

NHS

PE

NHS

PE

NHS

ROW Bond

CST Bond

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

Bond

PE

STP

ROW Bond

CST Bond

Year After 2007
Year 2005
Year LOCL LOCL 2005
Year Underway
2005
Year 2005 2006
Year 2006 After 2007 After 2007
Year 2005 2006
Year Underway
2005 2006
Year Underway
2006 2005 2007 After 2007 Year Underway 2007 After 2007
Year Underway Underway
2005 2006

Federal

State

Other

Federal $0

State $20,000,000

Other $0

Federal $0 $0
$1.600.000

State $0 $0 $0

Other $0 $0
$400,000

Federal

State

$0 $11,923,000

Other $0

Federal $40,000
$1.200,000

State $10,000 $300,000

Other $0 $0

Federal $160,000

State $40,000

Other $0

Federal $120,000 $7,932,695

State $30,000 $1,983,174

Other $0 $0

Federal
$120,000 $10,440,800

State
$30,000 $2,610,200

Other
$0 $0

Federal

State

Other

$3,360,000

$840,000

$0

$6,240,000 $1,560,000

$0

$0 $83,300,000

$0

Federal

State

Other

$5,308,800

$0 $1,327,200

Federal

State

Other

$0

$988,000

$0

$0

$7,680,000

$0

Total
Total
$20,000,000
Total
$0
$0 $2,000,000
Total
$11,923,000 Total
$50.000
$1,500,000
Total
$200,000
Total
$150,000
$9,915,869
Total $150,000 $13,051,000 Total $4,200,000 $7.800,000
$83,300,000
Total
$6.636,000
Total $988,000 $7,680,000
Page 88of 300



STATE TRANSPORTA TION IMPROVEMENT PROGRAM 21712005

Cobb

Project: 731865- Type Work: Replace Bridge

Descp: SR 92 @ PROCTOR CREEK/LAKE ACWORTH IN

SWACWORTH

Length: 0.57

TIP#: CO-311

Project: 752830- Type Work: Replace Bridge

Descp: CR 4455/CANTON ROAD &RR BR OVER SR 3/US

41 N OF MARIETIA

Length: 0.41

TIP#: CO-272

Project: 752710- Type Work: Replace Bridge

Descp: CS 3498/ATLANTA RD@ CHATIAHOOCHEE

RIVER FULTON-COBB CO LINE

Lanes: Exist. 2 Prop. 4

Length: 0.60

TlP#: CO-I04

Project: 752850- Type Work: Replace Bridge

Descp: SR 280/JAMES JACKSON PKWY @ CHATT.

RIVER-SOU RR &APPROACHES

Lanes: Exist. 2 Prop. 4

Length: 1.08

TIP#: AT-I08A&B

Project: 771132- Type Work: Bicycle/Ped. Facility Descp: MARIETTA MULTI USE TRAIL - PHASE 2

Length: 0.00 TlP#: CO-AR-BPI7

Project: 771232- Type Work: Bicycle/Ped. Facility Descp: MULTI-USE TRAIL FM KENNESAW MTN TO
CHATTAHOOCHEE TRAIL Length: 0.00

LUMP SUM PROJECT

TlP#: AR-384ABC

Project: MOO1533 Type Work: Resurface & Maintenance

Descp: SR 401/SR 403 FR UNIVERSITY TO BROOKWOOD

1-285/1-75 RAMPS

Length: 13.77

TIP#: AR-IIIG

Project: M002563 Type Work: Resurface & Maintenance

Descp: SR 120 FROM JOHN WARD ROAD TO EAST

PIEDMONT ROAD

Length: 8.06

LUMP SUM PROJECT

TIP#: lump

Project: M002565 Type Work: Resurface & Maintenance Descp: SR 5 CONN FROM SR 3 TO SR 5

LUMP SUM PROJECT

Length: 2.07 TIP#: lump

Project: M002912 Type Work: Resurface & Maintenance

Descp: 1-20EB FM SWEETWATER CREEK TO HE HOLMES

RD &1-285 RAMPS

Length: 8.63

LUMP SUM PROJECT

TlP#:

Project: M002965 Type Work: Guardrail

Descp: 1-75 FROM SR 5 CONNECTOR TO CR 633/RED TOP

MOUNTAIN ROAD

Length: 24.53

TlP#: AR-126G

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 2007

Federal
$80,000 $2,764,800

State
$20,000 $691,200

Phase PE ROW CST CST

Fund Bridge Bridge Bridge STP

Phase Fund

PE Bond

PE

Bridge

ROW Bond

CST Bond

Phase PE ROW CST CST

Fund Bridge Bridge Bridge STP

Phase PE ROW CST

Fund Local Local CMAQ

Year Underway
2005 2007 2007
Year Underway Underway
2005 2006
Year Underway
2006 2007 2007
Year LOCL LOCL 2006

Federal
$2,250,400 $3,355,200 $1,728,000
Federal

State
$562,600 $838,800 $432,000 State

$0 $0
Federal
$1,412,000 $5,600,000 $1,600,000
Federal $0 $0
$172,000

$500,000 $6,700,000
State
$353,000 $1,400,000
$400,000
State $0 $0 $0

Phase PE ROW CST

Fund Local Local STP

Year LOCL LOCL LUMP

Federal $0 $0
$384,000

State $0 $0 $0

Phase Fund PE NHS CST NHS

Year 2007 2007

Federal $1,600,000 $20,800,000

State $400,000 $5,200,000

Phase Fund CST STP

Year LUMP

Federal $600,000

State $150,000

Phase Fund CST STP

Year LUMP

Federal $540,000

State $135,000

Phase Fund CST 1M

Year LUMP

Federal $11,700,000

State $1,300,000

Phase Fund

PE

1M

CST 1M

Year 2005 2005

Federal $1,800,000 $38,400,000

State $200,000 $9,600,000

Other $0 $0
Other
$0 $0 $0 Other
$0 $0 Other
$0 $0 $0 Other $73,950 $30,000 $160,394
Other $0 $0
$96,000
Other $0 $0
Other $0
Other $0
Other $0
Other $0 $0

Total $100,000 $3,456,000
Total $2,813,000 $4,194,000 $2,160,000
Total
$500,000 $6,700,000
Total $1,765,000 $7,000,000 $2,000,000
Total $73,950 $30,000 $332,394
Total $0 $0
$480,000
Total $2,000,000 $26,000,000
Total $750,000
Total $675,000
Total $13,000,000
Total $2,000,000 $48,000,000

Page 89 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Cobb
Project: M002970 Type Work: Guardrail Descp: 1-285 FROM WEST PACES FERRY ROAD TO
ASHFORD DUNWOODY ROAD Length: 9.78
TlP#: AR-IIIH
Project: T000583 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR CCT

Length: 0.00

TlP#: AR-CO-5307

Project: T000593 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR COBB

COUNTY

Length: 0.00

TlP#: AR-CO-5310

Project: T000934 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR CCT

Length: 0.00 TlP#: AR-CO-5307

Project: T000940 Type Work: Transit Projects

Descp: FY 2006 Section 5309 Capital for Cobb Community

Transit

Length: 0.00

TlP#:

Project: T000990 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR COBB
COUNTY Length: 0.00
TlP#: AR-CO-5310

Project: T001270 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR COBB
COUNTY Length: 0.00
TlP#: AR-CO-5310

Project: T001327 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR CCT

Length: 0.00 TlP#: AR-CO-5307

Phase Fund PE NHS CST NHS

Year 2007 2007

Federal $1,600,000 $30,400,000

State $400,000 $7,600,000

Other $0 $0

Phase Fund CST Transit

Year 2005

Federal $5,008,743

State $0

Other $1,252,186

Phase Fund CST Transit

Year 2005

Federal $96,099

State $24,025

Other $0

Phase Fund CST Transit

Year 2006

Federal $5,002,941

State $0

Other $1,250,735

Phase Fund CST Transit

Year 2006

Federal $1,250,000

State $156,250

Other $156,250

Phase Fund CST Transit

Year 2006

Federal $100,904

State $25,226

Other $0

Phase Fund CST Transit

Year 2007

Federal $105,950

State $26,487

Other $0

Phase Fund CST Transit

Year 2007

Federal $5,040,457

State $0

Other $1,260,114

Total
$2,000,000
$38,000,000
Total
$6,260,929
Total
$120,124
Total
$6,253,676 Total
$1,562,500
Total
$126,130
Total
$132,437
Total
$6,300,571
Page 90 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I2QQ5

Coffee

Project: 0001046 Type Work: Widening

Oescp: SR 32 FM NE OCILLA BYP TO 4 LANE @CR

296/MITCHELL RD Lanes: Exist. 2 Prop. 4

Length: 19.04

TIP#:

Project: 0003789 Type Work: Intersection Improvement Oescp: SR 158 AT CR 513IWOODROW STONE ROAD

LUMP SUM PROJECT

Length: 0.20 TIP#:

Project: 432117. Type Work: Replace Bridge

Oescp: SR 135/US 221 @ TIGER CREEK APP 6 MI NE OF

DOUGLAS

Length: 0.30

TIP#:

Project: 442970. Type Work: Replace Bridge

Oescp: SR 268/AMBROSEBROXTON RD @ HALLS CREEK

2 MI W OF BROXTON

Length: 0.38

TlP#:

Project: 442971. Type Work: Replace Bridge

Oescp: SR 268/AMBROSEBROXTON RD @ ROSES CRK

1.1 MI W OF BROXTON

Length: 038

TIP#:

Phase Fund PE State ROW State CST State

Year 2005 After 2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase PE ROW CST CST

Fund Bridge Bridge Bridge STP

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 After 2007 After 2007
Year Underway
2006 After 2007

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2006 After 2007

Federal $0

State $3,900,000

Federal $9,900
$115,200
Federal $11,200

State $1,100
$12,800
State $2,800

Federal $16,000

State $4,000

Federal $16,000

State $4,000

Other $0
Other $0 $0
Other $0
Other $0
Other $0

Total $3,900,000
Total $11,000 $128,000 Total $14,000
Total $20,000
Total $20,000

Page 91 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Colquitt

Project: 0000429 Type Work: Intersection Improvement

Descp: SR 35/US 319 & LANE ST AT 7 INTERSECTIONS IN

MOULTRIE

Length: 0.85

TlP#:

Project: 0001358 Type Work: Replace Bridge Descp: SR 37 @ OKAPILCO CREEK EAST MOULTRIE

Length: 0.30 TlP#:

Project: 0006691 Type Work: Streetscapes Descp: MOULTRIE STREETSCAPE INITIATIVE - PHASE II

Length: 0.00 TlP#:

Project: 431100- Type Work: Replace Bridge Descp: SR 256 @ WARRIOR CREEK NORTH OF SR 35

Length: 0.50
TIP#:
Project: 442750- Type Work: Replace Bridge Descp: CR 493/FUNSTON-SALE CITY @ UTILE CREEK
APP 1 MI NW FUNSTON Length: 0.20
TIP#:

Project: 471450- Type Work: Replace Bridge Descp: CR 4/wILBUR MURPHY RD.@ UTTLE CREEK &
OVERFLOW S OF FUNSTON Length: 0.59
TlP#:

Project: 471455- Type Work: Replace Bridge

Descp: CR 186/HAGET STILL ROAD@ OCHLOCKONEE

RIVER SE OF DOERUN

Length: 0.23

TlP#:

Project: 471460- Type Work: Replace Bridge Descp: CR 355/0'NEAL ROAD @ BRUSHY BRANCH APP
3.7 MI SW OF DOERUN Length: 0.20
TlP#:

Project: M001147 Type Work: Miscellaneous Improvement Descp: SR 33 BET NE 5TH AVE TO NE 4TH AVE

LUMP SUM PROJECT

Length: 0.22 TlP#:

Phase Fund

PE

NHS

ROW STP

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund CST H680

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2006
Year Underway
2005 2006
Year 2005
Year Underway
2007 After 2007
Year Underway
LOCL 2006
Year Underway
LOCL 2006
Year Underway
LOCL 2006
Year Underway
LOCL 2007
Year LUMP LUMP LUMP

Federal
$1.118,400
Federal $10,400
$405,600
Federal $500,000
Federal $4,000
Federal $0
$360,000
Federal $0
$1,220,000
Federal $0
$628,691
Federal $0
$272,800
Federal $40,000 $22,400
$231,200

State
$279,600
State $2,600
$101,400
State $0
State $1,000
State $0
$90,000
State $0
$305.000
State $0
$157,173
State $0 $0
State $10.000
$5,600 $57,800

Other
$0
Other $0 $0
Other $0
Other $0
Other $50,000
$0
Other $10,000
$0
Other $10,000
$0
Other $10.000 $68.200
Other $0 $0 $0

Total
$1,398,000
Total
$13.000
$507.000
Total
$500,000
Total
$5,000
Total $50,000 $450,000 Total $10,000
$1.525.000
Total
$10.000 $785,864 Total $10.000 $341,000 Total
$50.000
$28.000
$289,000
Page 92of300



STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 2J7I2QQ5

Columbia

Project: 0000766 Type Work: Interchange

Descp: 1-20 UPGRADES @ SR 47;SR388/COLUMIA & SR

150/MCDUFFIE

Length: 7.02

TIP#: 1M -4

Project: 0002041 Type Work: Intersection Improvement

Descp: SR 104 @CR 16/HALALI ROAD IN COLUMBIA

COUNTY

Length: 0.50

LUMP SUM PROJECT

TIP#:

Project: 0002286 Type Work: Sidewalks

Descp: HARLEM DOWNTOWN WALKWAY

REVITALIZATION PLAN

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0003662 Type Work: Intersection Improvement

Descp: SR 104IWASHINGTON ROAD @ CR 99/GIBBS

ROAD

Length: 0.38

LUMP SUM PROJECT

TlP#: NHSI

Project: 0004732 Type Work: Intersection Improvement Descp: SR 47 AT SR 223

LUMP SUM PROJECT

Length: 0.52 TlP#: STP LUMP S

Project: 0006420 Type Work: Barriers

Descp: 1-20 FM SR 80 TO RICHMOND COUNTY - CABLE

MEDIAN BARRIERS

Length: 29.52

LUMP SUM PROJECT

TlP#:

Project: 0006452 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ 7 LOC ALONG SR

383 IN COLUMBIA CO

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006602 Type Work: Multi-use Trail

Descp: AUGUSTA CANAL HISTORIC HEADGATES

MULTI-USE FACILITIES

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006603 Type Work: Multi-use Trail Descp: EUCHEE CREEK GREENWAY - PHASE II

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006694 Type Work: Rail Projects Descp: AUGUSTA RAIL RELOCATION PROJECT

Length: 0.00 TlP#:

Project: 0006699 Type Work: Barriers Descp: COLUMBIA COUNTY NOISE BARRIERS

Length: 15.32 TlP#:

Phase Fund CST 1M

Year 2005

Federal $10,260,000

State $1,140,000

Phase Fund

PE

STP

CST STP

Year LUMP LUMP

Phase Fund CST STP

Year LUMP

Federal $9,000
$378,900

State $1,000
$42,100

Federal $300,000

State $0

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase PE ROW CST

Fund STP STP STP

Year Underway
LUMP LUMP

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $0
$454,500
Federal $518,400 $378,000
Federal $2,104,200

State $0
$50,500
State $57,600 $42,000
State $233,800

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $392,000

State $98,000

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase Fund CST STP

Year LUMP

Federal $300,000

State $0

Phase Fund CST H170

Year 2005

Federal $1,000,000

State $0

Phase Fund

PE

H170

CST H170

Year 2005 2006

Federal $100,000 $100,000

State $0 $0

Other $0
Other $0 $0
Other $75,000
Other $394,400
$0 Other
$0 $0 Other $0
Other $0
Other $125,000
Other $75,000
Other $0
Other $0 $0

Total $11,400,000
Total $10,000 $421,000
Total $375,000
Total $394,400 $505,000 Total $576,000 $420,000 Total $2,338,000
Total $490,000
Total $625,000
Total $375,000
Total $1.000,000
Total $100,000 $100,000

Page 93 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Columbia

Project: 210570

Type Work: Widening

Descp: 1-20 FM BELAIR RDICOLUMBIA CO TO

RIVERWATCH PARKWAY/RICHMOND

Lanes: Exist. 4 Prop. 6

Length: 5.01

TIP#: NHS-6

Project: 221800. Type Work: Widening

Descp: SR 104 FM MP 11.95 SE/CR 80 TO NW OF SR 47 @

POLLARDS CORNER Lanes: Exist. 2 Prop. 4

Length: 3.30

TfP#:

Project: 221805. Type Work: Widening

Descp: SR 104 FM MP 8.95 S OF CR 515 TO MP 11.95 S OF

CR80 Lanes: Exist. 2

Prop. 4

Length: 3.00

TIP#: STP-Il

Project: 222140- Type Work: Passing Lanes Descp: SR 47 NB MP 8.33-9.53;SB AND NB 13.48 - 15.18

Lanes: Exist. 2 Prop. 4

Length: .4.18 TIP#:

Project: 227805- Type Work: ATMS/ITS

Descp: ATMS/I-20 COMMUNIC/SURVEILLANCE FM SR

388/COLUMBIA TO SC

Length: 11.72

T/P#: NHS-9

Project: 231350. Type Work: Passing Lanes

Descp: SR 47 SB FRM MP 2.45 NEAR KEG CREEK SOUTH

TO MP 3.88

Lanes: Exist. 2 Prop. 3

Length: 1.43

TfP#:

Project: 231440- Type Work: Widening

Descp: SR 232 FM OLD BELAIR RD/CR 221 TO BELAIR

RD/SR 383

Lanes: Exist. 2 Prop. 4

Length: 1.83

TIP#: STP-l

Project: 231710- Type Work: Median Work Descp: SR 104IWASHINGTON RD FM FLOWING WELLS
RD TO HALALI FARM RD Length: 4.71
TfP#: STP19

Project: 232305. Type Work: Replace Bridge Descp: SR 47@ KEG CREEK 6.9 MI N OF APPLING

Length: 0.24 TfP#:

Project: 232306. Type Work: Replace Bridge Descp: SR 223 @ UCHEE CREEK 2.2 MI NW OF
GROVETOWN Length: 0.22
TfP#: BRM -6

Project: 250470- Type Work: Widening

Descp: OLD PETERSBURG RD/OLD EVANS FM BASTON

RD TO WASHINGTON RD

Lanes: Exist. 2 Prop. 4

Length: 2.55

TIP#: STP5

Phase Fund PE NHS CST Bond

Year Underway
2007

Federal

State

$0 $36,100,000

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Federal $4.636.000

State $1.159.000

Phase PE ROW CST

Fund STP STP STP

Year Underway
2007 After 2007

Federal $2.327.200

State $581.800

Phase Fund PE STP ROW STP CST STP

Year Underway Underway After 2007

Federal

State

Phase Fund CST NHS

Year 2007

Federal $15.520,800

State $3.880.200

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 2007

Federal
$61.600 $942,400

State
$15,400 $235.600

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 After 2007

Federal $97,600

State $24,400

Phase Fund PE STP ROW STP CST STP

Year 2005 After 2007 After 2007

Federal $357.600

State $89,400

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 After 2007

Federal $11,200
$880,000
Federal $11,200

State $2.800
$220.000
State $2,800

Phase Fund PE STP ROW STP ROW STP ROW STP ROW STP CST STP

Year Underway Underway Underway
2005 After 2007 After 2007

Federal $11.844,800

State $2.961,200

Other $0
Other $0
Other $0
Other
Other $0
Other $0 $0
Other $0
Other $0
Other $0 $0
Other $0
Other
$0

Total $36.100.000
Total
$5,795,000
Total
$2.909.000 Total
Total
$19,401.000
Total $77.000
$1,178.000
Total
$122.000 Total
$447.000
Total
$14.000
$1,100,000 Total
$14.000
Total $14,806,000 Page 94of300

..''.')
.~
.t,,',
.'t:
t:
.'t ..''t; .t l
'
.>
.:t:
t;

.'t) .
',
t;
..0~

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aI2QQ5

Columbia

Project: 250560. Type Work: Widening

Descp: DAVIS RD FM SKINNER MILL TO WASHINGTON RD

&1-20 HALF DIAMOND

Lanes: Exist. 2 Prop. 4

Length: 1.60

TlP#: STP-8

Project: 250600. Type Work: Widening

Descp: FLOWING WELLS RD/SR 1017 FM 1-20TO

WASHINGTON RD IN AUGUSTA

Lanes: Exist. 2 Prop. 4

Length: 1.62

TIP#: STP-7

Project: 250620. Type Work: New Construction

Descp: WILLIAM FEW PARKWAY EXTENSION FM SR 104

TO HARDY-MCMANUS RD

Lanes: Exist. 0 Prop. 2

Length: 1.33

TIP#: STP-IO

Phase Fund PE STP ROW Q77 CST STP

Year Underway Underway
2005

Phase Fund PE STP ROW STP CST STP

Year Underway
2005 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
2005 After 2007

Federal

State

$8,231,200 $2,057,800

Federal
$4,360,000 $4,525,600

State
$1,090,000 $1,131,400

Federal $800,000

State $200,000

Other

Total

$0

$10,289,000

Other
$0 $0

Total
$5,450,000 $5,657,000

Other $0

Total $1,000,000

Page 95 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 20/2005

Cook
Project: 0000763 Type Work' Widening Descp: 175FM LOWNDES CO LINE TO SR 37 - PHASE 2

Lanss: Exist. 4 Prop. 6

Length 7.90 TlP#:

Project: 0000784 Type Work: Widening

D#1scp: 175FM SR 37 TO CR 246fKINARD BRIDGE RD

PHASE 2
Lanes:Exist. 4 Pro". 6

Length: 9,30

TIP#:

Project: 0000785 TYfJ8 Work.: Widening

Descp: 1-75FM CR 246fCOQK TO CR 204 IN TIFT CO

PHASE 2

Lanes: Exist.

Prop, 6

Length: 9.80

TIP#:

Project: 0008535 Type Work: Streetscapes Descp: ADEL DOWNTOWN MULTIMODAL PROJECT

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 410520.

Type Work: Widening

Desc;p: 1-76 FM SR 37 TO CR 248/KINARD BRIDGE RD -

PHASE 1 Lanes: Exist. 4

ProP. 6

Length: 9.30

TIP#:

Project: 410530. TYtJ9 Work: WidE!ning Descp: 1-15 FM CR 246 TO TIFT CO LINE PHASE 1

Lanes: Exist.

Prop, 6

Length: 3.9S TIP#:

Project: "10820. Type Work: water Pollution Mitig_ Descp: 175 RJW FOR HEART PINE & CECIL BAY
WETLANDS _MITIGATION Length: 0.00
TIP1/-.

project: 432015- Type Worle Replace Bridge DesCP: SR 7/US 41 @GIDDENSMILLCREEKINNORTH
ADEL
Length' 0.21
TIP#.-

Project: 442881

Type Work' Replace Bridge

OeSCp: SR 37@WITHLACOOCHEE RIVER & OVERFLOW

AT COOKBERRIEN CO LN

Length: 0.95

TIPtI.-

Phase Fund
PE NHS
ROW Bond
CST Bond

Ym 2005
After 2007 After 2007

Phase Fund
PE NHS
ROW Bond
CST Bond

Vear
2005
After 2007 After 2007

Phase Fund
PE NHS ROW NHS CST Bond

Y.., 2005 2007 After 2007

Phase Fund
CST STP

Y. .,
LUMP

Federal $400,000
Fedoral
$400,000
t=J.r.1 $400,000 $3,4517,600
Foderal $350,400

State $100,000
St.te $100,000
State $100,000 $874,400
St.te
$0

pm.se Fund
PE NHS PE NHS CST Bond

Y. ., Underway
2005 2006

Phase Fund
PE NHS PE NHS CST Bond

Y. ., Underway
2005 2007

Phase Fund
ROW NHS

Y. . , 2006

Federal

Stare

$400,000 $0

$100,000 $55,304,000

Federal

State

$400.000 $0

$100,000 $29,152,000

F-ederal $2"0,000

Statlt $60,000

Phase Fund
PE Bridge
ROW Bridge
CST Bridge

Y. ., Underway
2006 After zo07

Federal $24,000

Phase Fund
PE Bridge
ROW Bridge
CST Bridge

Y. .r
Underway Underway
2005

Federal 53,852,000

Statlt $6,000
erere $963,000

Other $0

To'" $500,000

Other $0

Total
$500,000

Oth...
$0 $0

Tot1 $500,000 $4,312,000

Oth ...
$87,600

To'" $438,000

Other
$0 $0

To,.,
$500,000 $55,304,000

Other
SO $0

To. .,
$500,000 $29,152,000

Other $0

Toto' $300,000

Oth ...
$0

To,.,
$30.000

Oth ...

To'"

$0

$4,815,000

P8ge 96 of 300

~
~
"
"-
~
<-
~ ~
l. l. L
l.
\.. i... L
l. l.
i..
l.. l.. L l \..
~
~ ~ \, ~
"-
<,

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/712005

Coweta
Project: 0000$01 Type Work": BicyclefPed. FaCility
Descp: SENOIA MULT1USE TRAIL FROM CITY PARK TO
BALL FIELD Length" 1.10
TlP#' CW-ARBPO
Project: 0000818 Type Work: nuersecuon Improvemenl
Descp: SR 16 AT SR 74/SR 85 IN SENOIA

LUMP SUM PROJECT

Length: 057 TJP#" AR-IS7

Project: 0000930 Type Work: tmereecuon Impruvement Descp: SR 141 US 29 AT CR 552IWELDON ROAD

LUMP SUM PROJECT

Length: 0.49 T/P#" AR-157

Project: 0001357 Type Worlc: Replace Bridge

Descp: SR 16/US 27 AlT@CHATTAHOOCHEERIVERAT

COWETA CO LINE

Length: 120

TlP#: (W.OlS

Project: 0002180 Type Work: Railroad CrO$$ing

Descp: CS 706JE WASHINGTON 5T IN NEWNAN @ CSX #

050427N

Length: 040

LUMP SUM PROJECT

TJP#: ARIS6

Project: 00022.7 Type Work: Sidewalk$
Descp: GREENVILLE STREET CORRIDOR IMPROVEMENT
~ROJECT
LenQth: 0.00

LUMP SUM PROJECT

TlP#: AR384ABC

Project: 0003161 Type Work: WH;lening Descp: 1-85FROM SR 14JUS 29 TO SR 34

Lanes: Exist. 4 Prop. 6

Lenglh: 11.44 TIP#: CWAROOI

Project: 0003783 Type Work: Intersection. Improvement
Descp: SR 1eIWELLS STREET AT CR 157IBROAD ST & LUTHER BAILEY ROAD Length' 0.32

LUMP SUM PROJECT

TlP#:

Project: 0004408 Type WO/1(: rntereectcn Improvement Descp: SR 16@WITCHERIGLOVER;SR
154@HAMMOCK&VAUGHN;US 29@2 LOC Length: 1.20
TJP#: CW.033A

Pr0j9CI: 0004-407 Type Work: Minor Widen &. Resurl Descp: LOWER FAYETTEVILLE ROAD FROM GRIESON
TRAIL TO FISCHER ROAD Length: 5.00
TlP#: CW-OJ2

Project: 0004721 Type Worle lntersectlon Improvement Descp: SR 54 AT SR 154 & CR 55/MCINTOSH TRAIL IN
SHARPSBURG Length: 0.45

LUMP SUM PROJECT

TJP#:

Phase Fund
PE Local ROW Local CST CMAQ

Year
LOCL
toct.
2006

Phase Fund PE STP ROW STP CST STP

Y..,
Underway LUMP LUMP

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Phase PE ROW CST

Fund Bridge Bridge Bridge

Yea'
Underway
2005
2006

Phase Func1 CST STP

Yea'
LUMP

Phas. Fund CST STP

Year LUMP

Phase Fund
PE NHS
CST Bond

Year underway
200e

Phase PE ROW CST

Fund STP Local STP

Yea'
Underway LOCL LUMP

Phase PE ROW CST

Fund Bond Local Bond

Year Underway
LOCL 2006

Phase Fund CST RRBS

Y. .,
2005

Philse Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Federal
$0 $0 $270.180
Federal
$71,100 $253.800
Federa'
$0 $342.900
Federal
$40,000 $2,556.000
Federal $100,000

Stare $0 $0 $0

Other $0 $0
$68,400

State
$7,900 $28.200

Other
$0 $0

State
$0 $38,100

Other
$300,000 $0

State
$10,000 $639,000

Other
$0 $0

Slale
$0

Other
$0

Fede,,' $623,152

Stare $0

Other $155,7B8

Fedfll'8J

State

$0 $33,000,000

Other
$0

Federa'
$0
S232,200

Srate
$0
$25,800

Other
$37.600 $0

Fed_
$0
So

State
$0
$1,800,000

Othe,
S100,000
$0

Feder" $0

St.t. $6,000.000

Orner
$0

Federal
$123,750 $393,300

Stare
$13,750 $43,700

orn",
$0 $0

Tor.I $0 $0
$338,580
Tota'
$79,000 $282,000
Total $300,000 $381.000
Tot.l $50,000
$3,195.000
Tota' $100,000
rotal
snB,940
Total $33,000.000
To,.t $37,600
$258,000
To'" $100,000 $1,800.000
To,.,
$6,000.000
rotal
$137,500 $437,000

Page 97 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2005

Coweta

Project: 0005191 Type Work: Intersection Improvement

Descp: SR 54 @ STEWART ROAD/REESE ROAD;

MCINTOSH TRAIL

Length: 0.40

TIP#: CW-0338

Project: 0006293 Type Work: Intersection Improvement

Descp: SR 154@ OLD HWY 16; SR 16 @ PINE RD; SR 54

@GORDONRD

Lenglh: 1.20

TlP#: CW-033C

Project: 0006453 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ 4 LOC ALONG SR 14 IN COWETA COUNTY Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006460 Type Work: Barriers

Descp: 1-85 NOISE WALLS FROM SR 154 TO

COLLINSWORTH RD

Length: 5.11

TlP#: CW-AR-006

Project: 0006591 Type Work: Streetscapes Descp: SHARPSBURG SIDEWALKS & STREETSCAPE

LUMP SUM PROJECT

Lenglh: 0.00 TlP#:

Project: 0006877 Type Work: Widening Descp: SR 16 FM 1-85 TO US 29

Lanes: Exist. 2 Prop. 4

Length: 0.50 TIP#: CW-034

Project: 311790. Type Work: Ramp

Descp: 1-85/SR 34 RAMP RECONSTRUCTION SOUTHEAST

QUADRANT

Lanes: Exist. 0 Prop. 1

Length: 1.40

TlP#: CW-AR-007

Project: 322400. Type Work: Widening

Descp: SR 34 BY/NEW FM CR 70/HOS RD TO JEFFERSON

PKWY INC RR BRIDGE

Lanes: Exist. 2 Prop. 4

Length: 2.63

TlP#: CW-006A

Project: 322405. Type Work: Widening

Descp: SR 34 BYP/NEWNAN FM JEFFERSON PKWY TO

SR 34

Lanes: Exist. 2 Prop. 4

Length: 0.60

TIP#: CW-0068

Project: 322800. Type Worle New Construction

Descp: NEWNAN SOUTHWEST BYPASS FM SR 34 TO SR

14ATSR16

Lanes: Exist. 0 Prop. 2

Length: 6.20

TlP#: CW-007

Project: 333175. Type Work: Replace Bridge Descp: SR 74 @ CSX RAILROAD (639456G) 3.4 MI S OF
SENOIA Length: 0.29
TlP#: CW-029

Phase Fund

PE

Bond

ROW Local

CST Bond

Year Underway
LOCL 2006

Phase Fund

PE

Bond

ROW Local

CST Bond

Year Underway
LOCL 2006

Phase Fund

PE

STP

'CST STP

Year Underway
LUMP

Phase Fund

PE

Q02

CST NHS

Year 2005 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL 2007

Phase Fund

PE

1M

ROW 1M

ROW 1M

CST Bond

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2005 2006
Year Underway
2006 2007

Phase Fund ROW STP CST STP

Year 2006 2007

Phase Fund

PE

Local

PE

STP

ROW Local

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year LOCL Underway LOCL 2007
Year Underway
2005 2006

Federal
$0 $0

State
$0 $650,000

Other
$100,000 $0

Federal
$0 $0

State
$0 $1,500,000

Other
$100,000 $0

Federal $240,000

State $60,000

Other $0

Federal $745,575

State $186,394

Other $0

Federal $312,000

State $0

Other $78,000

Federal $0 $0
$640,000
Federal

State $0 $0 $0

Other $56,000 $450,000 $160.000

State

Other

$1.159.200 $0
Federal
$582.240 $3,308.000

$289,800 $9.962,000
State
$145,560 $827,000

Federal $1.200.000 $2,000,000

State $300,000 $500.000

$0 $0 Other
$0 $0
Other $0 $0

Federal $0
$0 $5.360.000
Federal
$63.200 $1,121.600

State $0

Other $470.000

$0 $0
State

$970,000 $1.340,000
Other

$15.800

$0

$280,400

$0

Total $100,000 $650,000
Total $100,000 $1.500.000
Total $300,000
Total $931,969
Total $390,000
Total $56.000 $450,000 $800,000
Total
$1,449.000 $9.962.000
Total $727.800 $4.135.000
Total $1.500.000 $2.500.000
Total $470,000 $970.000 $6,700.000 Total $79.000 $1,402.000

..,'

Page 98 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2QQ5

Coweta

Project: 333176- Type Work: Replace Bridge

Descp: SR 74@ SOUTHERN RAILROAD (718831X) CITY

OF SENOIA

Length: 0.27

T1P#: CW-028

Project: 333177. Type Work: Replace Bridge Descp: SR 74 @ LINE CREEK COWETA-FAYETTE CO LINE

Length: 0.44 TIP#: CW-031
Project: 343375. Type Work: Replace Bridge Descp: SR 54 @ SHOAL CREEK 4.4 MI N OF TURIN

Length: 0.23 T1P#: CW-030

Project: MOO2434 Type Work: Concrete Rehab

Descp: 1-85FM COLLINSWORTH RD/COWETA TO SR

74/FULTON

Length: 491

LUMP SUM PROJECT

T1P#: Lump

Phase PE ROW CST CST

Fund Bridge Bridge Bridge STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase PE ROW CST CST

Fund Bridge Bridge Bridge STP

Phase Fund CST 1M

Year Underway
2007 After 2007 After 2007
Year Underway
2006 2007 2007
Year Underway
2007 After 2007 After 2007
Year LUMP

Federal $8,000
Federal $118,400 $844,800 $1,364,800 Federal
$10,400
Federal $12,960,000

State $2,000
State $29,600 $211,200 $341,200 State
$2,600
State $1,440,000

Other $0

Total $10,000

Other
$0 $0 $0 Other
$0

Total
$148,000 $1,056,000 $1,706,000
Total
$13,000

Other $0

Total $14,400,000

Page 99 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2flI2QQ5

Crawford

Project: 0006021 Type Work: Turn Lanes

Descp: SR 221US 60 FM EXISTING 4 LANE TO CULPEPPER

CREEK

Lanes: Exist. 2 Prop. 3

Length: 1.65

TIP#:

Phase Fund ROW STP CST STP

Year 2007 After 2007

Federal $200,000

State $50,000



Other
$0

Total $250,000













Page 100of300





STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2a/2QQ5

Crisp

Project: 0002229 Type Work: Replace Bridge Descp: CR 71/AMBOY ROAD @ LIME CREEK 2 MI E OF
ARABI Length: 0.27
TlP#:

Project: 0003385 Type Work: Water Pollution Mitig.

Descp: 1-75STREAM MITIGATION IN TIFT; TURNER &

CRISP COUNTIES

Length: 0.00

TlP#:

Project: 410260- Type Work: Widening Descp: 1-75FM SR 300 TO DOOL Y COUNTY LINE

Lanes: Exist. 4 Prop. 6

Length: 6.90 TlP#:

Project: 431130- Type Work: Replace Bridge

Descp: CR 357/HAWPOND ROAD @ DEEP CREEK 5.8 MI E

OF ARABI

Length: 0.25

TlP#:

Project: 431132- Type Work: Replace Bridge

Descp: CR 357/HAWPOND ROAD @ REEDY BRANCH 4.9

MI EOFARABI

Length: 0.20

TlP#:

Project: 442660- Type Work: New Construction Descp: SR 90/CR 366 RELOCATION FROM SOUTH OF CR
365 TO SR 257 Length: 2.80
TIP#:

Project: 450550- Type Work: Bridges Descp: 24TH AVENUE/SR 987 GRADE SEPARATION AT
NORFOLK SOUTHERN RR Length: 0.34
TIP#:

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2006

Phase Fund CST NHS

Year 2007

Federal
$0 $231,200
Federal $145,600

State

Other

$0 $57,800

$1,998,000 $0

State $36,400

Other $0

Phase Fund PE NHS ROW NHS ROW HPP CST Bond

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway Underway Underway
2006
Year Underway
LOCL 2007

Federal

State

$0 Federal

$21,217,000 State

$0 $311,200

$0 $77,800

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2007

Federal
$0 $199,200

State
$0 $49,800

Phase PE ROW CST

Fund STP STP STP

Year Underway
2007 After 2007

Federal $201,600

State $50,400

Phase PE ROW CST

Fund STP STP STP

Year Underway Underway
2005

Federal

State

$5,352,000

$1,338,000

Other
$0 Other
$0 $0 Other $0 $0 Other $0
Other
$0

Total $1,998,000
$289,000 Total $182,000
Total
$21,217,000 Total $0 $389,000 Total $0 $249,000 Total $252,000
Total
$6,690,000

Page 101 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Dade

Project: 0006280 Type Work: New Construction

Descp: ACCESS ROAD FM SOUTH INDUSTRIAL BLVD TO

PINEY GROVE ROAD Lanes: Exist. 0 Prop. 2

Length: 0.80

T1P#:

Project: 621230- Type Work: Widening

Descp: SR 136 FM CR 52 TO SR 58/US 11{INCLUDE INT

W/I59} Lanes: Exist. 2

Prop. 5

Length: 0.80

T1P#:

Project: M002386 Type Work: Bridge Painting
Descp: PROPOSED BRIDGE PAINTING AT SEV LOCS IN BARTOWIDADEIGORDON Length: 0.00

LUMP SUM PROJECT

T1P#:

Phase Fund

PE

APD

ROW Local

CST APD

Year Underway
LOCL 2005

Phase Fund PE STP ROW STP CST STP

Year Underway
2006 After 2007

Phase Fund CST 1M

Year LUMP

Federal $0
$1,000,000
Federal $328,000
Federal $286,560

State $0 $0
State $82,000
State $31,840

Other
$50,000 $250,000
Other
$0

Total $50,000 $1,250,000
Total $410,000

Other $0

Total $318,400

Page 102 of 300

.'...'''

STATE TRANSPORTA nON IMPROVEMENT PROGRAM zaL2QQ5

Dawson
Project: 0001170 Type Work: Intersection Improvement Descp: LUMPKIN CAMPGROUND ROADICR 223 AT
DAWSON FOREST ROADICR 252 Length: 0,20 TlP#:
Project: 132790- Type Work: Interchange Descp: SR 400 INTERCHANGE AT SR 53/CORR A1
Length: 2,67 TlP#:

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2005

Federal
$0 $180,800

State
$0 $45,200

Phase PE ROW CST

Fund APD App Dev AppDev

Year Underway
2005 2006

Federal
$1,027,200 $15,069,600

State
$256,800 $3,767,400

Other
$81,000 $0

Total
$81.000 $226,000

Other
$0 $0

Total
$1,284,000 $18,837,000

Page 103 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aI2QQ5

Decatur

Project: MOO2968 Type Work: Resurface & Maintenance

Descp: SR 97 FM SR 1 BUS/US 27 TO SR 311/E RIVER RD

IN BAINBRIDGE

Length: 0.72

LUMP SUM PROJECT

T/P#:

Project: MOO2971 Type Work: Resurface & Maintenance
Descp: SR 38 FM WEST OF COLLEGE RD-WHIGHAM
DAIRY RD TO GRADY CO LN Length: 10.08

LUMP SUM PROJECT

TlP#:

Phase Fund CST STP
Phase Fund CST STP

Year LUMP
Year LUMP

Federal $72,000

State $18,000

Federal $1,740,000

State $435,000

Other
$0

Total $90,000

Other
$0

Total $2,175,000

Page 104 of 300

.....'''''

STATE TRANSPORTA nON IMPROVEMENT PROGRAM za/ZOO5

Dekalb

Project: 0000608 Type Work: Sidewalks Descp: MEMORIAL DR SIDEWALKS FM MORELAND
AVE/SR 42 TO CANDLER RD Length: 3.30
TIP#: AT-AR-llPI2

Project: 0000715 Type Work: HOV Lanes

Descp: 1-20 FROM 1-285 EAST TO EVANS MILL ROAD ADD

2 HOV LANES
Lanes: Exist. a Prop. 2

Length: 7.40

TlP#: AR-H-250

Project: 0000949 Type Work: New Construction

Descp: PERIMETER CENTER PKWY EXT OVR 1-285 FM

HAMMOND TO LAKE HEARN

Lanes: Exist. 0 Prop. 4

Length: 0.40

TlP#: DK-215A&1l

Project: 0001758 Type Work: HOV Lanes

Descp: 1-285 FM 1-75/COBB THRU FULTON TO

1-85/DEKALB FOR HOV Lanes: Exist. 10 Prop. 12

Lenglh: 13.12

TlP#: ARH-300A

Project: 0001791 Type Work: New Construction

Descp: LITHONIA IND BLVD EXT; PH2 FM ROGERS LAKE

TO ROCK CHPLlSR124 Lanes: Exist. 0 Prop. 4

Length: 1.13

TIP#: DK-270C

Project: 0001814 Type Work: Railroad Crossing

Descp: MONTREAL RD/CR 1130 GRADE SEPARATION AT

CSX RR

Length: 0.40

TlP#: DK-275

Project: 0002404 Type Work: Sidewalks

Descp: SR 8 FROM MORELAND AVE TO EAST OF

EASTLAND DR

Length: 4.10

TlP#: DKAR-BP06

Project: 0002405 Type Work: Sidewalks

Descp: SR 10/MEMORIAL DR. FROM MOUNTAIN DR. TO

GOLDSMITH ROAD

Length: 4.92

TIP#: DK-AR-BP05

Project: 0002407 Type Work: Sidewalks Descp: SR 421BRIARCLIFF FM PONCE DE LEON AVE TO
NO, DRUID HILLS RD Length: 4.40
TlP#: DK-AR-llP05

Project: 0002410 Type Work: Sidewalks Descp: SR 141 FROM MCGRAW DR./MP 3.0 TO N.
PEACHTREE RD.lMP 4.8 Length: 1.80
TlP#: DK-AR-llP05

Project: 0002411 Type Work: Sidewalks

Descp: SR 154 FROM COLUMBIA DRIVE TO KENSINGTON

ROAD

Length: 1.58

TlP#: DK-AR-llP05

Phase PE ROW CST

Fund Local Local CMAQ

Year LOCL LOCL 2006

Federal $0 $0
$409,600

State $0 $0 $0

Phase Fund

PE

NHS

ROW Bond

CST Bond

Year 2005 After 2007 After 2007

Federal $7,040,000

State $1,760,000

Phase Fund

PE

HPP

ROW Bond

CST NHS

Year Underway
2004 2005

Federal
$0 $14,056,800

State
$8,000,000 $3,514,200

Phase Fund

PE

Bond

PE

NHS

PE

NHS

PE

NHS

ROW Bond

CST NHS

Phase Fund

ROW 4221

CST Bond

Year After 2007 Underway
2006 2007 After 2007 After 2007 Year 2005 2005

Federal

State

$4,000,000 $4,000,000

$1,000.000 $1,000.000

Federal $0 $0

State $3,165.000 $7,165,000

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2006

Federal
$550,400 $4,224.000

State
$137,600 $1,056,000

Phase Fund

PE

STP

ROW Local

CST STP

Year 2006 LOCL After 2007

Federal $73,600 $0

State $18,400
$0

Phase PE ROW CST

Fund STP STP STP

Year 2005 2007 After 2007

Federal $160,000 $480,000

State $40,000 $120,000

Phase PE ROW CST

Fund STP Local STP

Year 2006 LOCL After 2007

Federal $79,200 $0

State $19,800
$0

Phase Fund

PE

STP

CST STP

Year 2007 After 2007

Federal $64,800

State $16.200

Phase Fund

PE

STP

CST STP

Year 2007 After 2007

Federal $28,800

State $7.200

Other $0 $0
$102,400
Other $0
Other $0 $0
Other
$0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0

Total $0 $0
$512,000
Total $8,800,000
Total $8.000.000 $17 ,571,000
Total
$5.000.000 $5.000,000
Total $3,165,000 $7,165,000
Total $688,000 $5,280,000
Total $92,000
$0
Total $200,000 $600,000
Total $99.000 $0
Total $81,000
Total $36,000

Page 105 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
zaJZOO5

Dekalb
Project: 0002412 Type Work: Sidewalks Descp: SR 155 FM SNAPFINGER RD/CR 5196 TO
CANDLER RD@ FLAT SHOALS Length: 4.90
TIP#: DKARBP05

Project: 0002414 Type Work: Sidewalks

Descp: SR 236 FROM LAWRENCEVILLE HWY TO COWAN

ROAD

Length: 0.19

TlP#: DK-AR-BP05

Project: 0002415 Type Work: Sidewalks Descp: SR 260 FROM CANDLER ROAD TO COVINGTON
HWY Length: 4.10
TlP#: DK032

Project: 0002669 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS
LOCATIONS IN DEKALB CO Length: 0.00
TlP#: DK-344A

Project: 0002754 Type Work: ATMS/ITS

Descp: ATMS:I285 SURVEIL FM 1-75/CLAYTON NE THRU

FULTN TO 1-20/DEK

Length: 11.45

TlP#: AR-28\

Project: 0002799 Type Work: Landscaping Descp: CHAMBLEE-DUNWOODY RD FM
CLAIRVIEW/CUMBERLAND TO BUFORD HWY Length: 0.40

LUMP SUM PROJECT

TlP#: AR-384ABC

Project: 0002800 Type Work: Intersection Improvement Descp: SR 421US 23/MORELAND AVE @ SR 42
CONN/FREEDOM PARKWAY Length: 0.16

LUMP SUM PROJECT

TIP#: AR-118

Project: 0002851 Type Work: Sidewalks

Descp: CHAMBLEE-TUCKER PEDESTRIAN CORRIDOR IN CHAMBLEE(LCI PROJECT) Length: 0.26

LUMP SUM PROJECT

TlP#: DK-AR-223

Project: 0002852 Type Work: Sidewalks Descp: HOOD AVENUE PEDESTRIAN CORRIDOR IN
CHAMBLEE (LCI PROJECT) Length: 0.25

LUMP SUM PROJECT

TlP#: DK-AR-224

Project: 0002853 Type Work: Sidewalks Descp: P'TREE IND BLVD PEDESTRIAN CORRIDOR IN
CHAMBLEE(LCI PROJECT) Length: 0.57

LUMP SUM PROJECT

TIP#: DK-AR-225A

Project: 0002854 Type Work: Sidewalks Descp: WATKINS AVE PEDESTRIAN CORRIDOR IN
CHAMBLEE(LCI PROJECT) Length: 0.00

LUMP SUM PROJECT

TlP#: DK-AR-226A

Phase Fund PE STP ROW STP CST STP

Year 2007 After 2007 After 2007

Phase Fund PE STP ROW Local CST STP

Year 2007 LOCL After 2007

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2007

Phase Fund

PE

STP

CST STP

Year 2005 2006

Phase Fund CST Bond

Year 2005

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Phase Fund ROW Local CST STP

Year LOCL Underway

Federal $48,000

State $12,000

Other $0

Federal $8,000 $0

State $2,000 $0

Other $0 $0

Federal
$0 $1,476,000
Federal $2,000,000 $2,574,000

State

Other

$0 $369,000

$3,919,000 $0

State $500,000 $644,000

Other $0 $0

Federal $0

State $12,758,000

Other $0

Federal $0 $0
$400,000
Federal
$0 $116,360
Federal
$0 $162,400
Federal
$0 $341,600
Federal
$0 $146,400
Federal $0

State $0 $0 $0

Other $0 $0
$100,000

State
$0 $12,929

Other
$0 $0

State
$0 $0

Other
$0 $40,600

State
$0 $0

Other
$0 $85,400

State
$0 $0

Other
$0 $36.600

State $0

Other $0

Total
$60,000
Total $10,000
$0
Total
$3,919,000
$1,845,000
Total $2,500,000
$3,218,000
Total
$12,758,000
Total $0
$0
$500,000
Total
$0 $129,289
Total
$0 $203,000 Total
$0 $427,000
Total
$0
$183,000
Total
$0
Page 106 of300

.....,''''

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM za/ZQQ5

Dekalb

Project: 0002855 Type Work: Sidewalks

Descp: PTREE/MALONE ST PEDESTRIAN CORRIDOR IN

CHAMBLEE(LCI PROJ)

Length: 0.00

LUMP SUM PROJECT

TIP#: DK-AR-227

Project: 0002856 Type Work: Sidewalks

Descp: REVITALIZE DECATUR MARTA PLAZA AREA PH

1&2(LCI PROJECT)

Length: 0.00

LUMP SUM PROJECT

TIP#: DK-AR-228A

Project: 0002902 Type Work: Sidewalks Descp: SR 13 FROM NORTH DRUID HILLS RD TO
CHAMBLEE TUCKER RD Length: 4.72
TlP#: DK-324C

Project: 0002903 Type Work: Sidewalks Descp: SR 155/CLAIRMONT RD FROM NORTH DRUID
HILLS RD TO BUFORD HWY Length: 3.35
TlP#: DK-AR-BP05

Project: 0002904 Type Work: Sidewalks

Descp: SR 236/LAVISTA RD FM CHESHIRE BR RD/FL TN

TO BRIARCLIFF RD/DE

Length: 1.62

TlP#: DKARBP05

Project: 0002905 Type Work: Sidewalks Descp: SR 236/LAVISTA RD FM HAROBI RD TO
NORTHLAKE PKWY Length: 1.07
TlP#: DKARBP05

Project: 0002908 Type Work: Sidewalks

Descp: ROCKBRIDGE FROM STN. MTN.lLlTHONIA RD TO

MEMORIAL DR

Length: 5.91

TlP#: DK-AR-BP04

Projecl: 0003102 Type Work: Miscellaneous Improvement Descp: SR 155/CANDLER ROAD MAJOR ARTERIAL
ENHANCEMENTSPHASE2 Length: 3.73
TlP#: DK-268B

Project: 0003166 Type Work: HOV Lanes

Descp: 1-20FM EVANS MILL RD/DEKALB TO SALEM

RDIROCKDALE HOV LANES

Lanes: Exist. 6 Prop. 8

Length: 9.73

TlP#: AR-H-25IA

Project: 0003534 Type Work: Transit Projects

Descp: 1-265 FROM CUMBERLAND TO PERIMETER

CENTER TRANSIT

Length: 9.37

TlP#: AR900C

Project: 0003773 Type Work: Barriers
Descp: US 76/STONE MOUNTAIN FREEWY FM SCOTT BLVD TO EAST PARK PLACE Length: 9.56

LUMP SUM PROJECT

TIP#:

Phase Fund ROW Local CST STP

Phase Fund

PE

STP

ROW Local

CST STP

Phase PE ROW CST

Fund STP STP STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

HPP

ROW Local

CST HPP

Phase PE PE ROW CST

Fund NHS Bond NHS NHS

Phase Fund

PE

NHS

ROW Bond

CST Bond

CST Bond

Phase Fund

PE

STP

CST STP

Year LOCL Underway
Year Underway
LOCL LUMP
Year 2007 After 2007 After 2007
Year 2006 2007 After 2007
Year 2006 2007 After 2007
Year 2006 2007 After 2007
Year 2007 After 2007 After 2007
Year Underway
LOCL 2007
Year After 2007
2007 After 2007 After 2007
Year 2007 After 2007 After 2007 After 2007
Year Underway
LUMP

Federal $0

State $0

Federal
$0 $1,600,600
Federal $140,000

State
$0 $0
State $0

Federal $64,000
$120,000

State $16,000 $30,000

Federal $16,000 $46,000

State $4,000
$12,000

Federal $24,000 $72,000

State $6,000
$16.000

Federal $106,600

State $27,200

Federal
$0 $5,916,400

State
$0 $1,479.600

Federal $0

State $7,100.000

Federal $3,200,000

State $600,000

Federal $1,350,000

State $150.000

Other $0
Other $0
$450,200 Other $35,000
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0 $0
Other $0
Other $0
Other $0

Total $0
Total $0
$2,251,000 Total $175,000
Total $60,000 $150,000
Total $20.000 $60,000
Total $30,000 $90,000
Total $136,000
Total $0
$7.398.000 Total
$7.100.000
Total $4,000,000
Total $1,500,000

Page 107 of 300

STATE TRANSPORTATlON IMPROVEMENT PROGRAM
zat2QQ5

Dekalb
Project: 0003899 Type Work: Landscaping Descp: LANDSCAPING ON 120 IN DEKALB COUNTY

LUMP SUM PROJECT

Length: 0.00 TlP#: AR-124

Project: 0004408 Type Work: Intersection Improvement

Desct ASHFORD DUNWOODY ROAD AT PERIMETER

CENTER NORTH

Length: 0.40

TlP#: OK300

Project: 0004411 Type Work: Intersection Improvement

Descp: ASHFORD DUNWOODY ROAD AT ASHFORD

PARKWAY PHASE 1

Length: 0.40

TIP#: OK-303

Project: 0004412 Type Work: Intersection Improvement

Descp: ASHFORD DUNWOODY ROAD AT ASHFORD

PARKWAY (SOUTH)

Length: 0.40

TlP#: OK304

Project: 0004414 Type Work: Intersection Improvement

Descp: ASHFORD DUNWOODY ROAD AT MOUNT

VERNON HIGHWAY

Length: 0.20

TlP#: OK-306

Project: 0004415 Type Work: Intersection Improvement Descp: PERIMETER CENTER PARKWAY AT PERIMETER
MALL ENTRANCE Length: 0.40
TIP#: OK-307

Project: 0004416 Type Work: Intersection Improvement

Descp: PERIMETER CENTER WEST AT PERIMETER

CENTER PARKWAY

Length: 0.40

TlP#: OK-308

Project: 0004417 Type Work: Intersection Improvement Descp: PERIMETER CENTER WEST AT BELL SOUTH
ENTRANCE Length: 0.20
TIP#: OK309

Project: 0004418 Type Work: Intersection Improvement Descp: PERIMETER CENTER WEST AT PERIMETER MALL
ENTRANCE Length: 0.40
TIP#: OK-310

Project: 0004419 Type Work: Intersection Improvement Descp: PERIMETER CENTER WEST AT MEADOW LANE

Length: 0.20
TlP#: OK-311
Project: 0004420 Type Work: Intersection Improvement Descp: ASHFORD DUNWOODY ROAD AT ASHFORD
CENTER Length: 0.40
TlP#: OK-312

Phase Fund CST STP

Phase PE ROW CST

Fund Local Bond Bond

Phase Fund PE Local ROW Bond CST Bond

Phase Fund PE Local ROW Bond CST Bond

Phase PE ROW CST

Fund Local Bond Bond

Phase PE ROW CST

Fund Local Bond Bond

Phase Fund PE Local ROW Bond CST Bond

Phase Fund PE Local ROW Bond CST Bond

Phase Fund PE Local ROW Bond CST Bond

Phase Fund PE Local ROW Bond CST Bond

Phase PE ROW CST

Fund Local Bond Bond

Year LUMP
Year LOCL 2005 2005
Year LOCL 2006 2006
Year LOCL 2006 2006
Year LOCL 2006 2006
Year LOCL 2007 2007
Year LOCL 2005 2005
Year LOCL 2005 2005
Year LOCL 2005 2005
Year LOCL 2005 2005
Year LOCL 2006. 2006

Federal $449,600

State $112,400

Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0
Federal $0 $0 $0

State $0
$40,000 $392,800
State $56,240 $40,000 $500,000
State $56,240 $40,000 $500,000
State $50,000 $40,000 $500,000
State $50,000 $40,000 $460,000
State $0
$40,000 $460,000
State $0
$40,000 $500,000
State $0
$40,000 $500.000
State $0
$40,000 $460,000
State $66,240 $30,000 $500,000

Other $0
Other $50,000 $10,000 $98,200
Other $14,060 $10,000 $125,000
Other $14,060 $10,000 $125,000
Other $12,500 $10,000 $125,000
Other $12,500 $10,000 $115,000
Other $62,500 $10,000 $115,000
Other $70,300 $10,000 $125,000
Other $62,500 $10,000 $125.000
Other $62,500 $10,000 $115.000
Other $16,560
$7,500 $125,000

Total $562,000
Total $50,000 $50,000 $491,000
Total $70,300 $50,000
$625,000
Total $70,300 $50,000 $625,000
Total $62,500 $50,000 $625,000
Total $62,500 $50,000 $575,000
Total $62,500 $50,000
$575,000
Total $70,300 $50,000 $625,000
Total $62,500 $50,000 $625,000
Total $62,500 $50.000 $575,000
Total $82,800 $37.500
$625,000
Page 108 of 300



..;' ....1:,'

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2flIZOO5

Dekalb

Project: 0004421 Type Work: Intersection Improvement

Descp: ASHFORD DUNWOODY ROAD AT ASHFORD

GABLES

Length: 0.40

T1P#: DK-313

Project: 0004422 Type Work: Intersection Improvement Descp: ASHFORD DUNWOODY ROAD AT RAVINIA DRIVE

Length: 0.40 T1P#: DK-314

Project: 0004423 Type Work: Intersection Improvement

Descp: HAMMOND DRIVE AT PERIMETER MALL

ENTRANCE

Length: 0,40

TIP#: DK-315

Project: 0004424 Type Work: Streetscapes Descp: PERIMETER CENTER PARKWAY STREETSCAPE

Length: 0,50 T1P#: DK-316
Project: 0004451 Type Work: Replace Bridge Descp: CLIFTON ROAD AT CSXJRR

Length: 0.40 TIP#: DK-219

Project: 0004478 Type Work: Bicycle/Ped. Facility

Descp: STREETSCAPES @ SEV LOCS ALONG MALONE &

WATKINS - LCI

Length: 0.43

LUMP SUM PROJECT

T1P#: DK AR 229

Project: 0004479 Type Work: Bicycle/Ped. Facility
Descp: MILLER DRIVE FM PEACHTREE RD TO
ABANDONED RAIL SPUR - LCI Length: 0.31

LUMP SUM PROJECT

T1P#: DK AR 230

Project: 0004480 Type Work: Bicycle/Ped. Facility
Descp: PERIMETER CTR PKWY FM HAMMOND DR TO PERIMETER CTR WEST- LCI Length: 0.50

LUMP SUM PROJECT

T1P#: DK-AR-23I

Project: 0004840 Type Work: Bicycle/Ped. Facility Descp: SR 13IBUFORD HWY FROM FULTON CO LINE TO
SHALLOWFORD TERRACE Length: 4.78
TIP#: DK-324A

Project: 0004641 Type Work: Bicycle/Ped. Facility Descp: SR 13IBUFORD HWY FM SHALLOWFORD
TERRACE TO GWINNETT CO LINE Length: 3.50
TlP#: DK-324E

Project: 0004829 Type Work: Sidewalks Descp: PERIMETER CENTER SIDEWALKS EAST OF
ASHFORD DUNWOODY ROAD Length: 0.00
TIP#: DK-318A

Phase PE ROW CST

Fund Local Bond Bond

Phase Fund

PE

Local

ROW Bond

CST Bond

Phase Fund

PE

Local

ROW Bond

CST Bond

Phase Fund

PE

Local

ROW Bond

CST Bond

Phase PE ROW CST

Fund Local Local STP

Phase Fund

PE

STP

CST STP

Year LOCL 2006 2006
Year LOCL 2005 2005
Year LOCL 2005 2005
Year LOCL 2007 2007
Year LOCL LOCL 2007
Year LUMP LUMP

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase PE ROW CST

Fund Local Local Bond

Phase Fund

PE

Local

ROW Local

CST Bond

Phase Fund

PE

Local

CST Bond

Year LOCL LOCL 2005
Year LOCL LOCL 2005
Year LOCL 2005

Federal $0 $0 $0

State $0
$40,000 $500,000

Federal $0 $0 $0

State $0
$40,000 $358,400

Federal $0 $0 $0

State $0
$40,000 $447,000

Federat $0 $0 $0

State $0
$80,000 $2,304,960

Federat $0 $0
$3,522,400

State $0 $0 $0

Federal $117,600 $468,000

State $0 $0

Federal $56,896

State $0

Federal $1,320,000

State $0

Federal $0 $0 $0

State $0 $0
$2,500,000

Federal $0 $0 $0

State $0 $0
$2,500,000

Federal $0 $0

State $0
$196,800

Other $70,300 $10,000 $125,000
Other $62,500 $10,000 $89,600
Other $62,500 $10,000
$0
Other $210,000
$20,000 $576,240
Other $200,000 $500,000 $880,600
Other $29,400 $117,000
Other
$14,224
Other
$326,700
Other $0 $0 $0
Other $0 $0 $0
Other $26,500 $49,200

Total $70,300 $50,000
$625,000
Total $62,500 $50,000 $448,000
Total $62,500 $50,000 $447,000
Total $210,000 $100,000 $2,881,200
Total $200,000 $500,000 $4,403,000
Total $147,000 $585,000
Total
$71,120
Total
$1,646,700
Total $0 $0
$2,500,000
Total $0 $0
$2,500,000
Total $26.500
$246,000

Page 109 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Dekalb
Project: 0004830 Type Work: Sidewalks Descp: PERIMETER CENTER SIDEWALKS WEST OF
ASHFORD DUNWOODY ROAD Length: 0.00
TlP#: OK318B

Project: 0004831 Type Work: Streetscapes Descp: PERIMETER CTR STREETS CAPE FM MT VERNON
TO ASHFORD DUNWOODY Length: 0.95
TIP#: OK-323

Project: 0005875 Type Work: Widening

Descp: CONSTITUTION RD FM MORELAND AVE TO

INTERNATIONAL PARK DR

Lanes: Exist. 2 Prop. 4

Length: 1.61

TlP#: OK-007

Project: 0005905 Type Work: Widening

Descp: PANOLA RD FM THOMPSON MILL RD TO

SNAPFINGER RD Lanes: Exist. 2 Prop. 4

Length: 3.16

TlP#: OK065A

Project: 0005947 Type Work: Bicycle/Ped. Facility Descp: BIKE PATH FM MORELAND TO OLD
RCKBR-HAMBRICK TO STN MTN PK Length: 0.00
TlP#: OK-325

Project: 0005955 Type Work: Widening

Descp: SR 121COVINGTON HIGHWAY FM SR 124 TO LAKE

CAPRI ROAD

Lanes: Exist. 2 Prop. 4

Length: 1.25

TIP#: OK030B

Project: 0006089 Type Work: Railroad Crossing Descp: CR 944/CHESTNUTT STREET @ CSX #279942B

LUMP SUM PROJECT

Length: 0.20 TlP#: lump

Project: 0006254 Type Work: Sidewalks Descp: US 23/SR 13 BUFORD HWY SIDEWALKS

Length: 0.00 TIP#: OK-324B

Project: 0006265 Type Work: Parking Areas
Descp: AVONDALE MARTA STATION PARKING DECK - LCI PROJECT Length: 0.00

LUMP SUM PROJECT

TlP#: OK-AR232

Project: 0006266 Type Work: Streetscapes
Descp: STREETSCAPE ALONG COLLEGE AVE AND SAM STREET-LCIPROJECT Length: 0.00

LUMP SUM PROJECT

TlP#: OK-AR 233

Project: 0006268 Type Work: Intersection Improvement Descp: NORTH DECATUR ROAD IMPROVEMENTS - LCI
PROJECT Length: 0.40

LUMP SUM PROJECT

TlP#: OK-AR 234

Phase Fund PE Local CST Bond

Year LOCL After 2007

Phase Fund PE Local ROW Local CST Bond

Year LOCL LOCL 2005

Phase Fund

PE

STP

CST STP

Year 2007 After 2007

Phase Fund

PE

Local

ROW Local

CST STP

Year 2005 LOCL After 2007

Phase Fund CST STP

Year 2005

Phase Fund

PE

STP

ROW STP

CST STP

Year 2007 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund

PE

Local

CST 064

Year LOCL 2005

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $0

State $0

Federal $0 $0 $0

State $0 $0
$2,406,400

Federal $400,000

State $0

Federal $8,000 $0

State $2,000 $0

Federal $65,200

State $0

Federal $32,000

State $8,000

Federal $135,000

State $0

Federal $0
$625,000

State $0 $0

Federal $2,224,800

State $0

Federal $570,400

State $0

Federal $2,000,000

State $0

Other $13,000
Other $192,000 $150,000 $601,600
Other $100,000
Other $0 $0
Other $16,300
Other $0
Other $0
Other $0
$156,250
Other $556,200
Other $142,600
Other $500,000

Total
$13,000
Total
$192,000
$150,000 $3,008,000 Total
$500,000
Total
$10,000 $0
Total
$81,500 Total
$40,000
Total
$135,000
Total
$0
$781,250
Total
$2,781,000
Total
$713,000
'.Total
$2,500,000
I. Page 110of300


.....,.,1...'''''

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aJ2QQ5

Dekalb

PrOject: 0006269 Type Work: Sidewalks

Descp: LAVISTA RD FM HAROBI DR TO NORTHLAKE

PKWY - LCI PROJECT

Length: 1.07

LUMP SUM PROJECT

TIP#: DK-AR 235

Project: 0006395 Type Work: ATMS/ITS Descp: ATMS/I-285 NE RAMP METERS-HAR FM 1-85 TO
1-20 Length: 12.95
TIP#: AR-437

Project: 0006397 Type Work: ATMS/ITS Descp: ATMS/I-85 N RAMP METERS-HAR FM BUFORD
HWY TO PLEASANT HILL Length: 16.43
TlP#: AR-439

Project: 0006402 Type Work: ATMSIITS

Descp: ATMS/I-20 RAMP METERS-HAR FM THORNTON

RD TO EVANS MILL RD

Length: 30.30

TIP#: AR-444

Project: 0006428 Type Work: Transit Projects

Descp: 1-285 FROM CUMBERLAND TO PERIMETER

TRANSIT CORRIDOR

Length: 9.91

TIP#:

Project: 0006429 Type Work: Transit Projects

Descp: 1-285 FROM CUMBERLAND TO PERIMETER

TRANSIT CORRIDOR

Length: 0.00

TIP#:

Project: 0006459 Type Work: Barriers Descp: 1-285NOISE WALLS FROM 1-20 TO
BOULDERCREST ROAD Length: 4.80
TlP#: DK-AR-247

Project: 0006564 Type Work: Streetscapes
Descp: MAIN STREET TUCKER DOWNTOWN REDEVELOPMENT PROJECT Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006565 Type Work: Multi-use Trail Descp: SOUTH RIVER GREENWAY TRAIL - PHASE I

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006566 Type Work: Streetscapes

Descp: DOWNTOWN LITHONIA STREETSCAPE PROJECT-

PHASE II

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006567 Type Work: Streetscapes
Descp: AVONDALE ESTATES PLAZA BEAUTIFICATION & STREETSCAPE PROJECT Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund

PE

NHS

CST Bond

Year 2005 2006

Phase Fund

PE

NHS

CST Bond

Year 2005 2006

Phase Fund

PE

NHS

CST Bond

Year 2006 2007

Phase PE PE ROW CST

Fund Bond Bond Bond Bond

Phase Fund

PE

Bond

CST Bond

Year 2005 2006 After 2007 After 2007
Year 2007 After 2007

Phase Fund

PE

a02

CST NHS

Year 2005 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Federal $860,000

State $0

Federal $20,000 $0

State $5,000
$1,000,000

Federal $40,000 $0

State $10,000 $3,000,000

Federal $32,000 $0

State $8,000
$2,500,000

Federat $0 $0

State $5,000,000 $20,000,000

Federal $0

State $11,000,000

Federal $477,168

State $119,292

Federal $900,000

State $0

Federal $920,000

State $0

Federal $750,400

State $0

Federal $348,000

State $0

Other $215,000
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $225,000
Other $230,000
Other $187,600
Other $87,000

Total $1,075,000
Total $25,000 $1,000,000
Total $50,000
$3,000,000
Total $40,000 $2,500,000
Total $5,000,000 $20,000,000
Total $11,000,000
Total $596,460
Total $1,125,000
Total $1,150,000
Total $938,000
Total $435,000

Page 111 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Dekalb
Project: 0006568 Type Work: Descp: UPTOWN PINE LAKE

Streetscapes

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006569 Type Work: Streetscapes
Descp: STONE MOUNTAIN MAIN ST DISTRICT STREETSCAPE-PHASEI Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006665 Type Work: Signing
Descp: 1-285WB FM BUFORD HIGHWAY TO PEACHTREE INDUSTRIAL BOULEVARD Length: 1.40

LUMP SUM PROJECT

TIP#:

Project: 0006807 Type Work: ATMS/ITS Descp: PERIMETER CENTER AREA FIBER OPTIC
INTERCONNECTION @ SEV LOCS Length: 0.00
TIP#: DK-334
Project: 0006808 Type Work: ATMSIITS Descp: MOUNTAIN INDUSTRIAL BLVD TRAFFIC SIGNAL
UPGRADE IN DEKALB Length: 6.97
TIP#: DK-335
Project: 0006809 Type Work: ATMSIITS Descp: NORTH DRUID HILLS ROAD TRAFFIC SIGNAL
UPGRADE Length: 0.00
TlP#: DK-336

Project: 0006810 Type Work: ATMS/ITS

Descp: US 29ILAWRENCEVILLE HIGHWAY TRAFFIC

SIGNAL UPGRADE

Length: 12.07

TIP#: DK-337

Project: 0006811 Type Work: Sidewalks

Descp: ASHFORD DUNWOODY ROAD SIDEWALK & BIKE

LANE

Length: 0.00

TlP#: DK-AR-BP04

Project: 0006812 Type Work: Bicycle/Ped. Facility Descp: KENSINGTON ROAD FROM REDAN ROAD TO
MEMORIAL DRIVE Length: 1.29
TlP#: DK-AR-BP04

Project: 0006843 Type Work: Transit Facilities Descp: MARTA- KENSINGTON TRANSIT STATION LCI
IMPLEMENTATION PROJECT Length: 0.00
TIP#: M-AR-28\

Project: 0006847 Type Work: Transit Projects Descp: MEMORIAL DR BUS RAPID TRANSIT
OPERATIONAL ASSISTANCE - 2006 Length: 0.00
TlP#: M-AR-283A

Phase Fund CST STP

Year LUMP

Federal $182,400

State $0

Other $45,600

Phase Fund CST STP

Year LUMP

Federal $900,000

State $0

Other $225,000

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $162,000

State $18,000

Other $0

Phase Fund CST CMAQ

Year 2006

Federal $1,064,000

State $0

Other $266,000

Phase Fund CST CMAQ

Year 2007

Federal $396,000

State $0

Other $99,000

Phase Fund CST CMAQ

Year 2007

Federal $200,800

State $0

Other $50,200

Phase Fund CST CMAQ

Year 2007

Federal $291,200

State $0

Other $72,800

Phase Fund CST STP

Year 2007

Federal $1,336,000

State $0

Other $334,000

Phase Fund CST CMAQ

Year 2007

Federal $400,000

State $0

Other $100,000

Phase Fund CST STP

Year 2007

Federal $128,000

State $0

Other $32,000

Phase Fund CST STP

Year 2006

Federal $15,370,000

State $0

Other $3,842,500

Total
$228,000
Total
$1,125,000
Total
$180,000
Total
$1,330,000
Total
$495,000 Total
$251,000
Total $364,000 Total $1,670,000
Total
$500,000
Total
$160,000
Total
$19,212,500
Page 112of300

.;
t;\
...t1'',
.J >
t, I
.'.,II
.'...
,
tj
.'t;
t,'
~)
..'''.,.t.1'),': .'t!
.\~
.':>
t,
t!
t-i,

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5

Dekalb
Project: 0006851 Type Work: Transit Projects Descp: MEMORIAL DR BUS RAPID TRANSIT
OPERATIONAL ASSISTANCE - 2007 Length: 0.00
TIP#: M-AR-283B
Project: 0006884 Type Work: Sidewalks Descp: SIDEWALKS ALONG 6 CORRIDORS - PHASE I

Length: 0.00 TlP#: DK-320A

Project: 0006888 Type Work: Widening

Descp: CR 627/HAYDEN QUARRY/SIGMAN RD FM

TURNER HILL TO ROCKDALE CO

Lanes: Exist. 2 Prop. 4

Length: 0.67

TIP#: DK-327A

Project: 0006998 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ 18 LOCATIONS IN

DEKALB CO

Length: 0.00

TlP#: DK-344

Project: 0006999 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @31 LOCATIONS IN

DEKALB CO

Length: 0.00

TlP#: DK-344

Project: 0007003 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @32 LOCATIONS IN

DEKALB CO

Length: 0.00

TIP#: DK-344

Project: 0007004 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @36LOCATIONS IN

DEKALB CO

Length: 0.00

TlP#: DK-344

Project: 713280- Type Work: Interchange

Descp: 1-285 @ SR 10/MEMORIAL DR & RELOCATE

GEORGE LUTHER DR Lanes: Exist. 4 Prop. 6

Length: 0.40

TIP#: DK-AR-205

Project: 713320- Type Work: Interchange Descp: 1-285@SR 8/US 29/LAWRENCEVILLE HIGHWAY

Lanes: Exist. 4 Prop. 6

Length: 0.70 TlP#: DK-AR-184

Project: 713405- Type Work: ATMS/ITS

Descp: ATMS/I-285 RAMP METERS-HAR FM 1-75 IN COBB

E TO 1-85IN DEK

Length: 13.17

TIP#: AR-241

Project: 713610- Type Work: Widening

Descp: 1-20FROM COLUMBIA DRIVE EAST TO EVANS

MILL ROAD

Lanes: Exist. 6 Prop. 8

Length: 7.40

TlP#: DK-AR-009A

Phase Fund CST CMAQ

Year 2007

Federal $2,500,000

State $0

Other $625,000

Phase Fund

PE

Local

ROW Local

CST STP

Phase Fund

PE

Local

ROW Local

CST STP

Phase Fund CST STP

Year LOCL LOCL 2007
Year LOCL LOCL 2007
Year 2006

Federal $0 $0
$2,888,000
Federal $0 $0
$1,200,000
Federal $1,501,600

State $0 $0 $0

Other $267,000 $100,000 $722,000

State $0 $0 $0

Other $150,000 $1,200,000 $300,000

State $375,400

Other $0

Phase Fund CST STP

Year 2006

Federa/ $2,657,600

State $664,400

Other $0

Phase Fund CST STP

Year 2006

Federal $2,668,800

State $667.200

Other $0

Phase Fund CST STP

Year 2006

Federal $3,002,400

State $750,600

Other $0

Phase Fund

PE

1M

ROW 1M

CST Bond

Year Underway Underway
2006

Phase Fund

PE

1M

ROW 04M

ROW 1M

CST Bond

Phase Fund

PE

NHS

CST NHS

Year Underway Underway Underway
2006
Year 2005 2006

Federal

State

$0 $19,535.000

Federal

State

$0
Federal $40,000
$1,200,000

$14,798,000
State $10,000 $300,000

Other
$0 Other
$0 Other
$0 $0

Phase Fund ROW NHS ROW NHS CST NHS

Year 2007 After 2007 After 2007

Federal $4,320,000

State $1,080,000

Other $0

Total $3,125,000
Total $267,000 $100,000 $3,610,000
Total $150,000 $1,200.000 $1,500.000 Total $1,877,000
Total $3,322,000
Total $3.336.000
Total $3,753.000
Total
$19,535,000
Total
$14,798.000 Total $50,000
$1,500,000
Total $5,400,000

Page 113 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005

Dekalb
Project: 714000. Type Work: Interchange Descp: 1-285FROM SR 400 TO N SHALLOWFORD RD

Lanes: Exist. 4 Prop. 6

Length: 3.06 TfP#: DK-AR-219

Project: 714085- Type Work: ATMSIITS

Descp: ATMSII-20 COMM/SURVEILLANCE FM 1-285/DEK

TO SR138/SR20/ROCK

Lenglh: 14.93

TIP#: AR-30S

Project: 714095. Type Work: ATMS/ITS

Descp: ATMS/I-675 COMM/SURVEIL FM 1-75/HENRY TO

1-2851DEKALB

Length: 10.32

TfP#: AR-433A&B

Project: 721820- Type Work: Widening

Descp: SNAPFINGER RD FM WESLEY CHAPEL RD TO

FLAT SHOALS PARKWAY

Lanes: Exist. 2 Prop. 4

Length: 1.78

TfP#: DK-OS6

Project: 721940 Type Work: ATMS/ITS Descp: ATMS/ SR 410 COMM/SURVEIL FM
LAWRENCEV'LE HWY TO E PARK PL Length: 8.22
T/P#: AR-471

Project: 731770- Type Work: Miscellaneous Improvement Descp: BUFORD HIGHWAY/SR 13/US 23 FM
SHALLOWFORD TERR. TO 1-285 Length: 2.20
TfP#: DK-324D

Project: 752900- Type Work: Replace Bridge Descp: SR 155/CANDLER RD AT SHOAL CKiREPL
CLVT;TRN LN&REMOVE PED BR Length: 0.20
TfP#: DK-2S0

Project: 752930- Type Work: Replace Bridge

Descp: BOULDERCREST ROAD AT THE SOUTH RIVER

SOUTH OF 1-285

Length: 0.20

TfP#: DK-260

Project: 753035 Type Work: Turn Lanes Descp: EAST PONCE DE LEON/CR 5151 AT HAMBRICK RD

Lanes: Exist. 2 Prop. 3

Length: 0.20 TfP#: DK-246

Project: 753170- Type Work: Miscellaneous Improvement Descp: SR 155/CANDLER ROAD ENHANCEMENTS AT
GLENWOOD RD - PHASE 1 Length: 0.38
TfP#: DK-268A

Project: 753200 Type Work: Miscellaneous Improvement

Descp: SR 154/SR 10/MEMORIAL DRIVE MAJOR ARTERIAL

ENHANCEMENTS

Length: 0.93

TfP#: DK-267

Phase PE ROW ROW CST

Fund 1M 1M 1M 1M

Phase Fund

PE

NHS

CST Bond

Phase Fund

PE

NHS

CST Bond

Phase Fund

PE

STP

ROW Local

CST STP

Phase Fund

PE

NHS

CST Bond

Phase Fund

PE

HPP

CST HPP

Phase Fund ROW STP CST STP

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Phase PE ROW CST

Fund STP Local STP

Phase PE ROW CST

Fund HPP Local HPP

Phase Fund PE HPP ROW Local CST HPP

Year Underway Underway
2007 After 2007
Year 2005 2006
Year 2006 2007
Year Underway
LOCL 2007
Year 2006 2007
Year Underway
2005
Year 2005 2006
Year Underway
LOCL 2006
Year Underway
LOCL 2006
Year Underway
LOCL 2005
Year Underway
LOCL 2005

Federal

State

Other

$96,873,300 $10,363,700

Federal $160,000
$0

State $40,000 $24,715,176

$0
Other $0 $0

Federal $120,000
$0

State $300,000 $16,493,000

Other $0 $0

Federal
$0 $5,910,400

State

Other

$0 $1,477,600

$4,700,000 $0

Federal $120,000
$0

State $30,000 $11,970,000

Other $0 $0

Federal $1,506,260

State $376,565

Other $0

Federal $617,600 $1,501,600

State $154,400 $375,400

Other $0 $0

Federal $0
$1,520,000
Federal $0
$800,000
Federal $0
$2,198,400
Federal $0
$8,708,000

State
$0 $380,000

Other
$45,000 $0

State
$0 $0

Other
$288,000 $200,000

State
$0 $0

Other
$50,000 $549,600

State

Other

$0

$50.000

$0 $2,177,000

Total
$107,237,000
Total $200,000 $24,715,176
Total $420,000 $16,493,000
Total $4,700,000 $7,388,000
Total $150,000 $11,970,000
Total $1,882,825
Total $772,000 $1,877,000
Total $45,000
$1,900,000
Total $288,000 $1,000,000
Total $50,000
$2,748.000
Total $50.000
$10,885,000
Page 114 of 300

-~

...'~.~'''

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2t7/2005

Dekalb

Project: 753230. Type Work: Widening

Descp: LITHONIA IND BLVD FM STN MTN-L1THONIA TO

ROGERS LAKE& RR SEP

Lanes: Exist. 2 Prop. 4

Length: 1.26

TIP#: DK-270AI.A

Project: 753265- Type Work: Intersection Improvement

Descp: EAST PONCE DE LEON AVE @ MCCLENDON DR &

GLENDALE RD

Length: 0.50

TlP#: DK-273

Project: 753290- Type Work: Intersection Improvement Descp: SR 236/LAVISTA RD AT BRIARCLIFF RDISR 42

Length: 0.20 TlP#: DK-274

Project: 770315. Type Work: Rail Projects

Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)

PHASE 1

Length: 0.00

TlP#: AR-269A

Project: 770316- Type Work: Rail Projects

Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)

PHASE 2

Length: 0.00

TlP#: AR-269B

Project: 771180. Type Work: Replace Bridge Descp: CR 164/L1NECREST ROAD @ CONLEY CREEK
NEAR PANTHERSVILLE RD Length: 0.19
TlP#: DK-256

Project: 771190. Type Work: Replace Bridge Descp: CR 1563/FLOWERS ROAD @ NORTH FORK
P'TREE CREEK NEAR MERCER U Length: 0.21
TIP#: DK-257A&B

Project: MOO2385 Type Work: Bridge Painting
Descp: PROPOSED BRIDGE PAINTING @ SEV LOCATIONS IN DEKALB & FULTON Length: 0.00

LUMP SUM PROJECT

TIP#: Lump

Project: M002387 Type Work: Bridge Painting Descp: 1-85 & 1-285 AT SEVERAL LOCATIONS PROPOSED
BRIDGE PAINTING Length: 0.00

LUMP SUM PROJECT

TIP#: Lump

Project: M002446 Type Work: Resurface & Maintenance Descp: SR 42 FM CUSTER AVENUE TO 1-20

LUMP SUM PROJECT

Length: 2.00 TIP#: Lump

Project: M002562 Type Work: Resurface & Maintenance Descp: SR 141 FROM FULTON COUNTY LINE TO
GWINNETT COUNTY LINE Length: 7.32

LUMP SUM PROJECT

TlP#: lump

Phase Fund

PE

HPP

ROW Bond

CST STP

CST HPP

Phase PE ROW CST

Fund Local Local STP

Year Underway
2005 2006 2006
Year LOCL LOCL 2006

Federal
$0 $4,719,200
$720,800
Federal $0 $0
$1,360,000

State

Other

$1,500,000 $1,179,800
$180,200
State $0 $0
$340,000

$0 $0 $0
Other $8,000 $1,250,000
$0

Phase Fund

PE

STP

ROW STP

CST STP

Year 2006 After 2007 After 2007

Federal $144,000

State $36,000

Other $0

Phase Fund

PE

STP

PE

HPP

CST HPP

Year Underway Underway
2005

Federal

State

$592,000

$148,000

Phase Fund CST HPP

Year 2005

Federal $40,000,000

State $10,000,000

Other
$0 Other
$0

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2006

Phase Fund

PE

Bridge

ROW Local

CST Bridge

CST STP

Phase Fund CST STP

Year Underway
LOCL 2005 2005
Year LUMP

Federal
$0 $149,600
Federal
$0 $644,000 $641,600 Federal $162,560

State
$0 $37,400

Other
$3,000 $0

State
$0 $158,000 $160,400
State $40,640

Other
$540,000 $0 $0
Other $0

Phase Fund CST 1M

Year LUMP

Federal $335,610

State $37,290

Other $0

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $480,000

State $120,000

Other $0

Phase Fund CST STP

Year 2005

Federal $2,268,773

State $567,193

Other $0

Total $1,500,000 $5,899,000
$901,000 Total
$8,000 $1,250,000 $1,700,000
Total $180,000
Total
$740,000
Total $50,000,000
Total $3,000
$187,000
Total $540,000 $802,000 $802,000 Total $203,200
Total $372,900
Total $600,000
Total $2,835,966

Page 115 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM ZmZQQ5

Dekalb
Project: MOO2823 Type Work: Interchange Descp: 1-285 INTERCHANGE @ SR 121COVINGTON HWY

LUMP SUM PROJECT

Length: 0.80 TfP#:

Project: MOO2824 Type Work: Interchange Descp: 1-285 INTERCHANGE @ SR 260/GLENWOOD RD

LUMP SUM PROJECT

Length: 0.80 TfP#:

Project: MOO2967 Type Work: Guardrail Descp: 1-285FROM CR 1764/ASHFORD DUNWOODY
ROAD TO CHAMBLEE TUCKER Length: 5.96
TfP#: AR-12611

Project: MOO2970 Type Work: Guardrail Descp: 1-285FROM WEST PACES FERRY ROAD TO
ASHFORD DUNWOODY ROAD Length: 9.78
T/P#: AR-IIIH

Project: TOOO594 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR DEKALB

COUNTY

Length: 0.00

TIP#: AR-DK-5310

Project: TOOO991 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR DEKALB

COUNTY

Length: 0.00

TIP#: AR-DK-5310

Project: TOO1115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rail - Phase II

Length: 0.00 TfP#:

Project: TOO1268 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DEKALB

COUNTY

Length: 0.00

TIP#: AR-DK-5310

Project: TOO1287 Type Work: Transit Projects Descp: Dekalb County BRT Improvements

Length: 0.00 TIP#:

Phase Fund

PE

1M

ROW 1M

CST 1M

Phase Fund

PE

1M

ROW 1M

CST 1M

Phase Fund

PE

1M

CST 1M

Year LUMP LUMP LUMP
Year LUMP LUMP LUMP
Year 2006 2006

Federal $6,300
$135,000 $306,000

State $700
$15,000 $34,000

Federal $6,300
$180,000 $315,000

State $700
$20,000 $35,000

Federal $1,600,000 $34,400,000

State $400,000 $8,600,000

Phase Fund

PE

NHS

CST NHS

Year 2007 2007

Federal $1,600,000 $30,400,000

State $400,000 $7,600,000

Phase Fund CST Transit

Year 2005

Federal $146,437

State $36,609

Phase Fund CST Transit

Year 2006

Federal $153,759

State $38,440

Phase Fund CST HPP

Year 2005

Federal $5,702,000

State $1,425,500

Phase Fund CST Transit

Year 2007

Federal $161,447

State $40,362

Phase Fund CST Transit

Year 2005

Federal $1,473,390

State $0

Other $0 $0 $0
Other $0 $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $0
Other $0
Other $294,678

Total $7,000
$150,000
$340,000 Total
$7,000
$200,000
$350,000
Total
$2,000,000
$43,000,000
Total
$2,000,000
$38,000,000
Total
$183,046
Total
$192,199 Total $7,127,500 Total
$201,809
Total
$1,768,068
Page 116of300

...'i' .'

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2012005

DOdge
Project: 0002226 Type Work: Replace Bridge Descp: CR 275/NEW BETHEL CH ROAD @ JOINER CREEK
9 MI NE OF CHAUNCEY Length: 0.20
TlP#:

Project: 0006476 Type Work: Guardrail

Descp: SR 117 FM EASTMAN CITY TO SR 29/US 441 S OF

DUBLIN @ 17 LOCS

Length: 20.74

LUMP SUM PROJECT

TJP#:

Project: 0006554 Type Work: Welcome center facilities Descp: DODGE COUNTY WELCOME CENTER

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 231930- Type Work: Widening

Descp: SR 30/US 280 FM WEST TO EAST CITY LIMITS OF

MILAN Lanes: Exisl. 2

Prop. 5

Length: 2.10

TJP#:

Project: 245355- Type Work: Replace Bridge

Descp: SR 87lEASTMAN-RHINE HWY @ SUGAR CREEK

1.8 MI S OF EASTMAN

Length: 0.29

TIP#:

Project: M002901 Type Work: Resurface & Maintenance Descp: SR 257 FM SR 126 IN DODGE TO CR 318/RAIL
ROAD ST IN LAURENS Length: 667

LUMP SUM PROJECT

TIP#:

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2006

Phase PE ROW CST

Fund STP STP STP

Year Underway
LUMP LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway After 2007

Phase Fund CST STP

Year LUMP

Federal $0
$397,600
Federal
$90,000 $675,000
Federal $314,400

State $0
$99,400
State $10,000 $75,000
State $0

Federal $815,469

State $203,867

Federal

State

Federal $547,200

State $136,800

Other $0 $0
Other $0 $0
Other $78,600
Other $0
Other
Other $0

Total $0
$497,000 Total $100,000 $750,000 Total $393,000
Total $1,019,336
Total
Total $684,000

Page 117 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005

Dooly

Project: 0002228 Type Work: Replace Bridge

Descp: CR 104/PLEASANT VALLEY RD @ LITTLE

PENNAHATCHEE CRK

Length: 0.11

TIP#:

Project: 0005320 Type Work: Intersection Improvement Descp: SR 215 @ 1-75

Length: 0.40 TfP#:

Project: 0006555 Type Work: Bicycle/Ped. Facility Descp: VIENNA PEDESTRIAN FACILITIES

LUMP SUM PROJECT

Length: 0.00 TfP#:

Project: 311665- Type Work: Bridge Rehab Descp: 1-75WIDEN BRIDGE & RAMPS @ SR 27

Length: 0.50 TfP#:

Project: 333190- Type Work: Replace Bridge

Descp: SR 27@PENNAHATCHEE CREEK WEST OF

VIENNA

Length: 0.22

TfP#:

Project: M002783 Type Work: Bridges Descp: 1-75@ 2 LaCS IN DOOlY & 1 LOC IN HOUSTON -
DECK REHAB Length: 1.20

LUMP SUM PROJECT

TIP#:

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCl 2005

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year Underway
2007 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund PE 1M ROW NHS CST NHS

Year Underway
2006 After 2007

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 After 2007

Phase Fund PE 1M CST 1M

Year lUMP lUMP

Federal $0
$492,000 Federal $160,000
Federal $400,000
Federal $731,200
Federal $36,000
Federal $135,000 $1,350,000

State $0
$123,000 State $40,000
State $0
State $182,800
State $9,000
State $15,000 $150,000

Other $0 $0
Other $0
Other $100,000
Other $0
Other $0
Other $0 $0

Total
$0 $615,000 Total $200,000
Total
$500,000
Total
$914,000
Total
$45,000
Total
$150,000
$1,500,000
Page 11801300



STATE TRANSPORTATION IMPROVEMENT PROGRAM ZmZOO5

Dougherty

Project: 0000522 Type Work: Intersection Improvement

Descp: SR 133 AT COUNTY LINE ROAD/CR 459 AT

WORTH/DOUGHERTY CO LN

Lanes: Exist. 2 Prop. 4

Length: 0.60

LUMP SUM PROJECT

TlP#: TSM-8

Project: 0002409 Type Work: Widening

Descp: CLARKE AVENUE/SR 300 FROM LIBERTY

EXPRESSWAY TO SR 62

Lanes: Exist. 4 Prop. 6

Length: 1.43

TlP#: HR-99-9

Project: 0002445 Type Work: Widening

Descp: SR 520 BUSINESS FM WASHINGTON ST TO

THORNTON DRIVE

Lanes: Exist. 4 Prop. 6

Length: 2.63

TIP#: H/R-99-11

Project: 0003774 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCS ALONG SR 234 & SR 91 Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006106 Type Work: Railroad Crossing
Descp: CS 1257/DON CUTLER SR DRIVE @ GFRR #723242T Length: 0.40

LUMP SUM PROJECT

TIP#:

Project: 0006693 Type Work: Transit Facilities Descp: ALBANY INTERMODAL FACILITY

Lanes: Exist.

Prop.

Length: 36.00 TIP#:

Project: 422550- Type Work: Interchange

Descp: SR 3/L1BERTY EXWY @ SR 91 & N.JEFFERSON

INTERCHANGE RAMPS

Length: 0.50

TlP#: NHS-2

Project: 422560- Type Work: Ramp

Descp: SR 31LIBERTY PKWY @ CLARK AVE - RAMPS &

TURN LANES/ALBANY

Length: 1.20

TlP#: NHS-4

Project: 422570- Type Work: Interchange

Descp: SR 3/L1BERTY EXWY @ NB & SB RAMPS AT SR

133/MOUL TRIE RD

Length: 0.50

TlP#: NHS-3

Project: 422675- Type Work: Signals

Descp: ATMS: ALBANY/DOUGHERTY COUNTY/GDOT

REGIONAL TCC

Length: 0.00

TlP#: NHS-6

Project: 431740-

Type Work: Widening

Descp: SLAPPEY BLVD/SR 62 & SR 520BU FM COLQUITI

AVE N TO TIFT AVE Lanes: Exist. 4 Prop. 6

Length: 1.92

TlP#: H/R-99-6

Phase Fund ROW STP CST STP

Year LUMP LUMP

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Phase Fund PE STP CST STP

Year Underway
LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST H170

Year 2005

Phase Fund PE NHS ROW NHS CST NHS

Year Underway
2006 2007

Phase Fund PE NHS ROW NHS CST NHS

Year Underway
2006 After 2007

Phase Fund PE NHS CST NHS

Year Underway
2006

Phase Fund CST NHS

Year 2005

Phase Fund PE STP ROW STP CST STP

Year 2005 2007 After 2007

Federal $90,000
$810,000
Federal $1,600,000
Federal $384,000
Federal $780,000
Federal $170,000
Federal $1,000,000
Federal $1,480,800 $1,742,400
Federal $1,061,600
Federal $3,619,200
Federal $336,800
Federal $134,400 $407,200

State $10,000 $90,000
State $400,000
State $96,000
State $195,000
State $0
State $0
State $370,200 $435,600 State $265,400
State $904,800
State $84,200
State $33,600 $101,800

Other $0 $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0 $0
Other $0
Other $0
Other $0
Other $0 $0

Total $100,000 $900,000
Total $2,000,000
Total $480,000
Total $975,000
Total $170,000
Total $1,000,000
Total $1,851,000 $2,178,000
Total $1,327,000
Total $4,524,000
Total $421,000
Total $168,000 $509,000

Page 119 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Dougherty
Project: MOO2960 Type Work: Descp: SR 133 @ FLINT RIVER

Bridges

LUMP SUM PROJECT

Length: 0.40 TlP#:

Project: TOOO641 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 OPERATING FOR ALBANY

Length: 0.00 TlP#:

Project: TOOO642 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR ALBANY

Length: 0.00 TIP#:

Project: TOOO643 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR ALBANY

Length: 0.00 TlP#:

Project: TOOO663 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR ALBANY

Length: 0.00 TlP#:

Project: TOOO901 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 OPERATING FOR ALBANY

Length: 0.00 TIP#:
Project: TOOO902 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR ALBANY

Length: 0.00 TIP#:
Project: TOOO903 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR ALBANY

Length: 0.00 TlP#:

Project: TOOO904 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR ALBANY

Length: 0.00 TlP#:
Project: TOO1221 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 OPERATING FOR ALBANY

Length: 0.00 TIP#:
Project: TOO1222 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR ALBANY

Length: 0.00 TlP#:

Phase Fund

PE

STP

CST STP

Year LUMP LUMP

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Federal $80,000
$640.000

State $20,000 $160,000

Other $0 $0

Federal $763,765

State $0

Other $1.196,353

Federal $496,710

State $62,089

Other $62.089

Federal $400,000

State $50.000

Other $50.000

Federal $29,745

State $7.436

Other $0

Federal $795,339

State $0

Other $1.213.802

Federal $402,510

State $50.314

Other $50.314

Federal $400,000

State $50.000

Other $50.000

Federal $31.232

State $7.808

Other $0

Federal $795,339

State $0

Other $1.359.127

Federal $402,510

State $50.314

Other $50.314

Total $100,000
$800,000
Total $1.960.138
Total
$620.887 Total $500,000 Total
$37.181 Total
$2.009.141 Total $503.138 Total $500.000 Total $39,040 Total $2.154,466 Total $503.138
Page 120of300

.'

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Dougherty
PrOject: TOO1223 Type Work: Transi! Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR ALBANY
Length: 0.00 TlP#:
Project: TOO1224 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR ALBANY
Length: 0.00 TIP#:
Project: TOO1297 Type Work: Transit Projects Descp: ALBANY INTERMODAL FACILITY
Length: 0.00 TlP#:

Phase Fund CST Transit

Year 2007

Federal $400,000

State $50,000

Phase Fund CST Transit

Year 2007

Federal $32,794

State $8,198

Phase Fund CST Transit CST Transit

Year 2005 2006

Federal $1,000,000 $1,000,000

State $0 $0

Other $50,000
Other $0
Other $250,000 $250,000

Total $500,000
Total $40,992
Total $1,250,000 $1,250,000

Page 121 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM za/ZQQ5

Douglas

Project: 0000333 Type Work: Intersection Improvement

Descp: SR 921DALLAS HIGHWAY AT THOMPSON

STREET/CR 519

Length: 0.50

TlP#: DO-28 I

Project: 0000424 Type Work: Intersection Improvement

Descp: SR 5/BANKHEAD HWY/BILL ARP RD AT ROSE

AVENUE/CS 573

Length: 0.20

LUMP SUM PROJECT

TIP#: AR-118

Project: 0000632 Type Work: Sidewalks

Descp: FAIRBURN RD SIDEWALKS FM BANKHEAD HWY

TO HOSPITAL DR

Length: 0.75

TlP#: DO-AR-BPO

Project: 0000633 Type Work: Sidewalks

Descp: MALONE ST SIDEWALKS FM STRICKLAND TO

BROWN ST

Length: 0.50

TlP#: DO-ARBPO

Project: 0000634 Type Work: Sidewalks

Descp: ROSE AVE SIDEWALKS FM SELMAN DR TO

CONCOURSE PKWY

Length: 1.00

TlP#: DOAR-BPO

Project: 0000635 Type Work: Sidewalks Descp: DOUGLAS BLVD SIDEWALKS W. FM BILL ARP/SR
5 TO BRIGHT STAR RD Length: 0.90
TlP#: DO-ARBPO

Project: 0000636 Type Work: Sidewalks Descp: CHAPEL HILL RD SIDEWALKS FM 120 TO CR
155/ARBOR PLACE BLVD Length: 0.37
TlP#: DOAR-BPO

Project: 0000952 Type Work: Replace Bridge Descp: SR 166 @ DOG RIVER 9.2 MI S OF DOUGLASVILLE

Length: 1.00 TIP#: DO-283

Project: 0001760 Type Work: HOV Lanes

Descp: 120 FM SR 6/DOUGLAS THRU COBB TO SR

280/FUL TON HOV LANES

Lanes: Exist. 8 Prop. 10

Length: 8.06

TIP#: AR-H-200

Project: 0001917 Type Work: Widening Descp: WIDEN LEE ROAD BRIDGE AT 1.20

Lanes: Exist. 2 Prop. 4

Length: 0.25 TIP#: DO-220B

Project: 0003165 Type Work: HOV Lanes

Descp: 120 WESTSIDE FROM SR 5/BILL ARP TO SR 6 FOR

HOVLANES

Lanes: Exist. 8 Prop. 10

Length: 9.97

TIP#: ARH-201

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL 2007

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

Local

CST CMAQ

Year LOCL 2005

Phase Fund PE Local ROW Local CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

STP

ROW Local

CST STP

Year 2006 LOCL 2006

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL Underway

Phase Fund PE NHS ROW NHS CST Bond

Year Underway
2006 After 2007

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year Underway
2006 2007

Phase Fund

PE

NHS

ROW NHS

CST Bond

Year Underway
2006 After 2007

Federal $0 $0
$160,000
Federal
$0 $1,117.800
Federal $0
$63.200

State $0 $0 $0
State
$0 $124,200
State $0 $0

Federal $0 $0
$50,400
Federal $0 $0
$217.600
Federal $0 $0
$78,400
Federal $0 $0
$29.600
Federal
$0

State $0 $0 $0
State $0 $0 $0
State $0 $0 $0
State $0 $0 $0
State
$0

Federal $5,000.000

State $1.250.000

Federal
$11.200 $1.600.000

State
$2.800 $400,000

Federal $4,000.000

State $1.000.000

Other $40.000 $75.000 $40.000
Other
$0 $0
Other $8.000 $15.800
Other $6.000
$0 $12.600
Other $20.000
$0 $54,400
Other $10.000
$0 $19.600
Other $4.000
$0 $7,400
Other
$10.000
Other
$0
Other
$0 $0
Other
$0

Total $40.000 $75,000 $200,000
Totat $0
$1.242.000
Total $8,000
$79.000
Total $6.000 $0
$63.000
Total $20.000
$0 $272.000
Total $10.000
$0 $98.000
Total $4.000 $0
$37.000
Total $10.000
Total $6.250.000
Total $14.000 $2.000.000
Total $5.000,000
Page 122 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005

Douglas
Project: 0003947 Type Work: Intersection Improvement Descp: SR 5/BILL ARP RD AT SR 166

LUMP SUM PROJECT

Length: 0.46 TIP#: AR-118

Project: 0004425 Type Work: New Construction

Descp: DURELEE LANE EXTENSION FM END OF

DURELEE LANE TO DORRIS RD

Lanes: Exist. 0 Prop. 2

Length: 0.78

TIPII: 00-009

Project: 0004427 Type Work: Widening Descp: LEE ROADISOUTH SWEETWATER RD PHASE 1

Lanes: Exist. 2 Prop. 4

Length: 0.40 TIP#: 00-022

Project: 0004428 Type Work: Widening

Descp: LEE ROAD FM 1-20TO FAIRBURN ROADISR 92

PHASE2 Lanes: Exist. 2

Prop. 4

Length: 2.83

TIP#: 00-220

Project: 0004481 Type Work: Lighting
Descp: DOUGLASVILLE GATEWAYS LIGHTING AND SIGNAGE FY 04 LCI PROJECT Length: 0.00

LUMP SUM PROJECT

TlP#: DOAR217

Project: 0004482 Type Work: Sidewalks

Descp: DOUGLASVILLE RESIDENTIAL SIDEWALKS FY

2004 LCI PROJECT

Length: 0.00

LUMP SUM PROJECT

TlP#: DO AR 219

Project: 0004504 Type Work: Bicycle/Ped. Facility Descp: VETERANS MEMORIAL HIGHWAY FM THORNTON
RD/SR 6 TO ROSEHILL ST Length: 1.00
TlP#: CO-AR-BPI8

Project: 0006270 Type Work: Intersection Improvement

Descp: DOUGLASVILLE INTERSECTION IMPROVEMENTS

- LCI PROJECT

Length: 0.00

LUMP SUM PROJECT

TlP#: DO-AR 220

Project: 0006324 Type Work: Replace Bridge

Descp: CR 201/MASON CREEK ROAD @ MOBLEY CREEK

TRIBUTARY

Length: 0.40

T/P#: 00-230

Project: 0006402 Type Work: ATMSIITS Descp: ATMS/ 1-20 RAMP METERS-HAR FM THORNTON
RD TO EVANS MILL RD Length: 30.30
T/P#: AR-444

Project: 0006457 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN

DOUGLAS/FULTON

Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund PE STP ROW STP CST STP

Year Underway Underway
LUMP

Phase PE ROW CST

Fund Bond Bond Bond

Year Underway
2005 2006

Phase Fund PE Bond PE STP ROW Bond CST Bond

Phase PE ROW CST

Fund Bond Bond Bond

Year Underway Underway
2006 2007
Year Underway
2006 2007

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund PE STP CST STP

Year Underway
LUMP

Phase Fund

PE

Local

CST CMAQ

Year LOCL 2005

Phase Fund PE STP CST STP

Year LUMP LUMP

Phase PE ROW CST

Fund Bridge Local Bridge

Year 2005 LOCL After 2007

Phase Fund

PE

NHS

CST Bond

Year 2006 2007

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal

State

$702,900

$78,100

Federal
$0 $0

State
$500,000 $1,400,000

Federal

State

$0 $0 Federal
$0 $0

$2,375,000 $4,284,000
State
$2,375,000 $6,035,000

Federal $73,600

State $0

Federal $295,900

State $0

Federal $0
$352,000

State $0 $0

Federal $40,000
$280,000

State $0 $0

Federal $24,800 $0

State $6,200 $0

Federal $32,000 $0

State $8,000
$2,500,000

Federal $896,000

State $224,000

Other
$0
Other $0 $0
Other
$0 $0 Other $0 $0
Other $18,180
Other $72,585
Other $44,000 $88,000
Other $10,000 $70,000
Other $0
$100,000
Other $0 $0
Other $0

Total
$781,000
Total $500,000 $1,400,000
Total
$2,375,000 $4.284,000
Total $2.375,000 $6,035,000
Total $91,780
Total $368,485
Total $44,000
$440,000
Total $50,000 $350,000
Total $31,000 $100,000
Total $40,000 $2,500,000
Total $1,120.000

Page 123 of 300

STATE TRANSPORTATlON IMPROVEMENT PROGRAM W/2QQ5

Douglas
Project: 0006622 Type Work: Multi-use Trail Descp: SWEETWATER CREEK GREENWAY & TRAIL

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 0006623 Type Work: Streetscapes Descp: O'NEAL PLAZA EAST IN DOUGLASVILLE

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006755 Type Work: Special Studies Descp: SR 6/CAMP CREEK PKWY FM 1-85 TO W HIRAM
PKWY- CORRIDOR STUDY Length: 29.07
TlP#: AR-465

Project: 0006902 Type Work: Unknown Descp: CR 8121CHAPEL HILL ROAD FROM 1-20 TO SR 166

Length: 6.67 TIP#: 00-284

Project: 712930- Type Work: Interchange

Descp: 1-20AT SR 921FAIRBURN RD & APPROACHES IN

DOUGLASVILLE

Length: 0.61

TIP#: 00-AR-208A

Project: 713620- Type Work: Widening

Descp: 1-20 FM SR 6fTHORNTON RD/DOUGLAS TO

FULTON INDUST BLVD/FULTO

Lanes: Exist. 6 Prop. 8

Length: 4.94

T1P#: 00-AR-057

Project: 720970- Type Work: New Construction

Descp: SR 92 RELOC FM DURELEE RD N TO SR 92 @

MALONE INCL GRADE SEP

Lanes: Exist. 0 Prop. 4

Length: 2.30

TlP#: 00-282C

Project: 721320- Type Work: Widening

Descp: BANKHEAD HWY FM SWEETWATER RD E TO

THORNTON RD

Lanes: Exist. 2 Prop. 4

Length: 1.10

TlP#: 00-016

Project: 721420. Type Work: Widening

Descp: SR 92 FM S/SR 166 NE TO LAKE MONROE RD/CR

140

Lanes: Exist. 2 Prop. 4

Length: 2.40

TIP#: 00-028

Project: 722040. Type Work: Widening

Descp: CAMP CREEK PKWY/SR 6fTHORNTON RD. FM 1-20

TO CHATT RIVER

Lanes: Exist. 4 Prop. 6

Length: 3.00

TlP#: AR-924B

Project: 753100. Type Work: Intersection Improvement Descp: KINGS HIGHWAY/CR 810 AT CENTRAL CHURCH
RD/CR 173 Length: 0.33
TlP#: 00-262

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year 2006

Phase Fund

PE

Local

ROW STP

CST STP

Year LOCL 2006 2007

Phase Fund

PE

1M

ROW 1M

CST Bond

Year Underway
2005 2006

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year 2006 After 2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 2006 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2005

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year 2007 After 2007 After 2007

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL 2006

Federal $350,400

State $0

Other $87,600

Federal $395,200

State $0

Other $98,800

Federal $600,000

State $0

Other $150,000

Federal $0
$500,000 $2,000,000

State $0 $0 $0

Other $300,000 $125,000 $500,000

Federal
$1,651,500 $0

State
$183,500 $5,084,000

Other
$0 $0

Federal $160,000

State $40,000

Other $0

Federal $4,000
$9,200,000

State $1,000
$5,320,000

Other $1,000,000 $2,300,000

Federal $4,351,200

'State $1,087,800

Other $0

Federal

State

Other

$7,440,000
Federal $144,000

$0 $1,860,000

State $36,000

Other $0

Federal
$0 $552,000

State
$0 $0

Other
$500,000 $138,000

Total $438,000
Total $494,000
Total $750,000
Total $300,000 $625,000 $2,500,000 Total $1,835,000 $5,084,000 Total $200,000
Total $1,005,000 $16,820,000
Total $5,439,000
Total
$9,300,000 Total $180,000
Total $500,000 $690,000
Page 124 of 300





STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 217/2005

Douglas

Project: 753110- Type Work: Intersection Improvement Descp: CHAPEL HILL RD/CR 812 AT WEST CHAPEL HILL
RD/CR 145 Length: 0.20
TlP#: DO-252CI

Project: 753295- Type Work: Replace Bridge

Descp: ANNEEWAKEE RD/CR 815 BRIDGE @

ANNEEWAKEE CREEK

Length: 0.42

TIP#: DO-275A

Project: 770163- Type Work: Bridge Rehab Descp: POST RD/CR 808 BRIDGE @ DOG RIVER

Length: 020 TlP#: DO-274

Project: M002836 Type Work: Resurface & Maintenance

Descp: SR 166 FM CARROLL COUNTY LINE TO FULTON

COUNTY LINE

Length: 20.00

LUMP SUM PROJECT

TlP#:

Project: M002912 Type Work: Resurface & Maintenance

Descp: 1-20 EB FM SWEETWATER CREEK TO HE HOLMES

RD & 1-285 RAMPS

Length: 8.63

LUMP SUM PROJECT

TlP#:

Project: TOO0586 Type Work: Transit Projects

Descp: FY 2005 DOUGLAS COUNTY SECTION 5307

CAPITAL

Length: 0.00

TlP#: AR-DO-5307

Project: TOO0595 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR DOUGLAS

COUNTY

Length: 0.00

TlP#: AR-DO-5310

Project: TOO0932 Type Work: Transit Projects

Descp: FY 2006 DOUGLAS COUNTY SECTION 5307

CAPITAL

Length: 0.00

TlP#: AR-DO-5307

Project: TOO0992 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR DOUGLAS

COUNTY

Lenglh: 0.00

TlP#: AR-DO-5310

Project: T001273 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR DOUGLAS

COUNTY

Length: 0.00

TlP#: ARDO-5310

Project: TOO1328 Type Work: Transit Projects

Descp: FY 2007 DOUGLAS COUNTY SECTION 5307

CAPITAL

Length: 0.00

TlP#: AR-DO-5307

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL 2006

Phase PE ROW CST CST

Fund Bridge Local Bridge STP

Phase PE ROW CST

Fund Bridge Local Bridge

Year 2005 LOCL 2007 2007
Year 2005 LOCL After 2007

Phase Fund CST STP

Year LUMP

Federal
$0 $472,000
Federal $40,000 $0
$240,000 $249,600 Federal
$40,000 $0
Federal $2,088,000

State
$0 $0
State $10,000
$0 $0 $0 State $10,000 $0
State $522,000

Phase Fund CST 1M

Year LUMP

Federal $11,700,000

State $1,300,000

Phase Fund CST Transit

Year 2005

Federal $471,746

State $58,968

Phase Fund CST Transit

Year 2005

Federal $16,017

State $4,004

Phase Fund CST Transit

Year 2006

Federal $470,719

State $58,840

Phase Fund CST Transit

Year 2006

Federal $16,818

State $4,204

Phase Fund CST Transit

Year 2007

Federal $17,658

State $4,415

Phase Fund CST Transit

Year 2007

Federal $493,648

State $61,706

Other $500,000 $118,000
Other $0
$20,000 $60,000 $62,400 Other
$0 $21,000
Other $0
Other $0
Other $58,968
Other $0
Other $58,840
Other $0
Other $0
Other $61,706

Total $500,000 $590,000 Total
$50,000 $20,000 $300,000 $312,000 Total $50,000 $21,000
Total $2,610,000
Total $13,000,000
Total $589,682
Total $20,021
Total $588,399
Total $21,022
Total $22,073
Total $617,060

Page 125 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2m2005

Early

Project: 0003777 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCS
ALONG SR 62 & SR 1 Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006112 Type Work: Railroad Crossing Descp: CS 630/ARLINGTON AVE @ NS #733632H

LUMP SUM PROJECT

Lenglh: 0.40 TIP#:

Project: 0006527 Type Work: Water Pollution Mitig.
Descp: 3 PARCELS TO MITIGATE PI#422115 & 422220/EARLY &422230/CLAY Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 422215. Type Work: Widening

Descp: SR 1IUS 27 FM CR 279/DAMASCUS-HILTON RD TO

BLAKELY BYPASS Lanes: Exist. 2 Prop. 4

Length: 7.00

TIP#:

Project: 422220. Type Work: Widening

Descp: SR 1IUS 27 FR BLAKELY BYPASS TO CLAY

COUNTY LINE

Lanes: Exist. 2 Prop. 4

Length: 7.15

TlP#:

Project: 431320- Type Work: Replace Bridge Descp: SR 1 OVER BLUE CREEK TRIB

Length: 0.75 TlP#:

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $416,000

Slale $104,000

Phase Fund CST STP

Year LUMP

Federal $155,000

Slale $0

Phase Fund ROW STP

Year LUMP

Federal $1,600,000

Slale $400,000

Phase Fund

PE

State

PE

Bond

ROW Bond

ROW Bond

CST Bond

Phase Fund

PE State

ROW RRBS

CST RRBS

Year Underway Underway Underway
2005 2006 Year Underway 2006 After 2007

Phase Fund PE Bridge CST Bridge

Year Underway
2006

Federal

Slale

$0 $0 Federal

$3,740,000 $18,539,000
Slale

$0 $1,434,000

Federal $368,800

Slale $92,200

Olher $0
Olher $0
Olher $0
Olher
$0 $0 Olher $0
Olher $0

Total $520,000 Total $155,000 Total $2,000.000 Total $3,740,000 $18,539,000 Total $1,434,000 Total $461,000
Page 126 of 300





STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2aI2QQ5

Echols
Project: 442985- Type Work: Replace Bridge Descp: SR 135 @ LITTLE RIVER APP 5 MI S OF JCT SR
376 Length: 0.26
TlP#:
Project: 442987- Type Work: Replace Bridge Descp: SR 94 @ SUWANNOOCHEE CREEK NEAR CLINCH
COUNTY LINE Length: 057
TlP#:

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway
2005

Federal $2.273.600
Federal $2.057.600

State $568,400 State $514,400

Other

Total

$0 Other

$2.842.000 Total

$0

$2,572.000

Page 127 of 300

STA TE TRANSPORTATION IMPROVEMENT PROGRAM 2aI2QQ5

Effingham

Project: 0001824 Type Work: New Construction

Descp: RINCON TRUCK BYPASS FM SR 21 NEAR

CHATHAM TO SR 275/SR 21

Lanes: Exist. 0 Prop. 2

Length: 11.25

TlP#:

Project: 0004913 Type Work: Widening

Descp: SR 119 FROM USHER ROAD TO SR 21 FOR

CENTER TURN LANE Lanes: Exist. 2 Prop. 3

Length: 3.00

TIP#:

Project: 0006482 Type Work: Railroad Crossing Descp: CR 105/BERRYVILLE RD @ CSX #635135L

LUMP SUM PROJECT

Length: 0.40 TlP#:

Project: 0006483 Type Work: Railroad Crossing Descp: CS 579/E. JOHNSON STREET@CSX#635129H

LUMP SUM PROJECT

Length: 0.40 TlP#:

Project: 0006636 Type Work: Multi-use Trail

Descp: GUYTON'S RAILS TO TRAILS COMMUNITY

PROJECT

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0008700 Type Work: Unknown

Descp: NORTH-SOUTH CONN FROM SR

119/EFFINGHAMTO SR 30/CHATHAM

Lanes: Exist. 0 Prop. 4

Lenglh: 14.40

TlP#:

Project: 522170- Type Work: Widening

Descp: SR 17&26/US 80 FM SR 17 TO CHERRY ST IN

BLOOMINGDALE/CHATHAM

Lanes: Exist. 2 Prop. 4

Lenglh: 2.49

TlP#: 96-H-5

Project: 533145- Type Work: Replace Bridge Descp: SR 26/US 80 @ OGEECHEE RIVER OVERFLOW 9
MI S OF GUYTON Length: 0.23
TlP#:

Project: 571450- Type Work: Replace Bridge Descp: CR 183/LOG LANDING ROAD @ EBENEZER
CREEK 4 MI N OF RINCON Lenglh: 0.15
TIP#:

Phase Fund PE STP ROW H060 ROW STP CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 After 2007 After 2007
Year 2005 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Federal $3.976.400
Federal $176.000
Federal $140.000

State $994.100
State $44.000
State $0

Phase Fund CST STP

Year LUMP

Federal $140.000

State $0

Phase Fund CST STP

Year LUMP

Federal $600.000

State $0

Phase Fund CST H170

Year 2005

Federal $250.000

State $0

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2005

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 2007

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2005

Federal

State

$4.197.600 $1,049,400

Federal
$10,400 $880,000

State
$2.600 $220.000

Federal
$0 $337,600

State
$0 $84,400

Other $0
Other $0
Other $0
Other $0
Other $150.000
Other $0
Other
$0 Other
$0 $0 Other $10.000 $0

Total
$4.970.500
Total
$220.000
Total
$140.000
Total
$140.000
Total $750.000
Total $250.000 Total $5.247.000
Total
$13.000 $1,100.000 Total
$10.000 $422.000
Page 128of300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2QQ5

Elbert

Project: 0000680 Type Work: Replace Bridge

Descp: CR 37/ELlAM ROAD @ WAHACHEE CREEK 5 MI S

OF MIDDLETON Lanes: Exist. 1 Prop. 2

Length: 0.21

TlP#:

Project: 0000681 Type Work: Replace Bridge

Descp: CR 84/SWEET CITY ROAD @ DOVE CREEK 6.5 MI

W OF ELBERTON Lanes: Exist. 1 Prop. 2

Length: 0.29

T/P#:

Project: 0000682 Type Work: Replace Bridge Descp: CR 195/PEACHTREE ROAD @L1TTLE
COLDWATER CREEK N OF ELBERTON Length: 0.21
T/P#:

Project: 0003907 Type Work: Intersection Improvement

Descp: SR 77 @ SR 368 & CR 242/BREWERS BR RD 3.5 MI

N OF ELBERTON

Length: 1.50

LUMP SUM PROJECT

TlP#:

Project: 0006604 Type Work: Welcome center facilities

Descp: ELBERT COUNTY CONFERENCE & WELCOME

CENTER

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006660 Type Work: Bridge Replacement Descp: CR 183/PLANTATION ROAD@ COLDWATER
CREEK Length: 0.40
TlP#:

Project: 132410 Type Work: Interchange

Descp: SR 721SR 17 IN ELBERTON RELOCATE

INTERCHANGE 1200 FT SW

Lanes: Exist. 2 Prop. 4

Length: 1.60

T/P#:

Project: 132990 Type Work: Replace Bridge Descp: SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON

Length: 0.23 TlP#:

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2005

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2006

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2005

Phase PE ROW CST

Fund STP STP STP

Year Underway
LUMP LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year 2006 LOCL After 2007

Phase Fund

PE

State

ROW State

CST RRBS

Year Underway Underway
2006

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 After 2007

Federal $0
$194,400
Federal $0
$458,400
Federal $0
$265,600
Federal $1,372,500 $2.565.000
Federal $500.000

State $0
$24,300
State $0
$57,300
State $0
$33,200
State $152,500 $285,000
State $0

Federal $44,000 $0

State $11,000
$0

Federal

State

$0 $11,615,000

Federal $12,000

State $3,000

Other $10,000 $24,300
Other $10,000 $57,300
Other $10,000 $33,200
Other $0 $0
Other $125,000
Other $0
$50,000
Other
$0
Other $0

Total $10,000 $243,000
Total $10,000 $573.000
Total $10.000 $332,000
Total $1.525,000 $2.850,000
Total $625,000
Totat $55,000 $50,000
Total
$11,615,000
Total $15,000

Page 129 of 300

STA TE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Emanuel
Project: 0006109 Type Work: Railroad Crossing
cs Descp: 818/COLEMAN STREET @ OGE #732673J

LUMP SUM PROJECT

Length: 0.20 TIP#:

Project: 0006451 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN

EMANUELITREUTLEN

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 221900- Type Work: Widening

Descp: SR 4!US 1 FM SOUTH TO NORTH CTY LMTS IN

OAK PARK/NEW LOC Lanes: Exist. 2 Prop. 4

Length: 2.20

TlP#:

Project: 221910- Type Work: Widening Descp: SR 4!US 1 FROM NCL OAK PARK TO 1-16

Lanes: Exist. 2 Prop. 4

Length: 2,30 TlP#:

Project: 222490- Type Work: Widening

Descp: SR 4!US 1 FM N. OF 1-16 NORTH TO SR 297@

SWAINSBORO BYPASS Lanes: Exist. 2 Prop. 4

Length: 9,80

TlP#:

Project: 222500- Type Work: Widening

Descp: SR 4/US 1 FM CR 104 TO US l/SR 4 BUS NEAR

WADLEY & JEFFERSON

Lanes: Exist. 2 Prop. 4

Length: 7.10

TIP#:

Project: 222510- Type Work: Widening

Descp: SR 4/US 1 FM N SWAINSBORO BP TO CR 1041

RELOC @ DELW'D

Lanes: Exist. 2 Prop. 4

Length: 6.71

TlP#:

Project: 231960'

Type Work: Replace Bridge

Descp: SR 56 (3) BRIDGES OVER OGEECHEE RVR &

OVFL NE OF SUMMERTOWN

Length: 0.82

TIP#:

Project: 232325-

Type Work: Replace Bridge

Descp: SR 26!US 80 @ E FORK YAM GRANDY CK 2.2 MI

SW OF SWAINSBORO

Length: 0.21

TIP#:

Project: 522130- Type Work: Widening

Descp: SR 4!US 1 FM LYONS CL TO SOUTH CUOAK PARK

IN EMANUEL CO

Lanes: Exist. 2 Prop. 4

Length: 9.20

TIP#:

Phase Fund CST STP

Year LUMP

Phase Fund PE STP CST STP

Year Underway
LUMP

Phase Fund PE Stale PE Bond ROW Bond CST Bond

Phase Fund

PE

State

ROW Bond

CST Bond

Year Underway Underway
2006 2007
Year Underway
2006 2007

Phase Fund

PE

Slaie

PE

Bond

ROW Bond

CST Bond

Phase Fund

PE state

PE

Bond

ROW Bond

CST State

Phase Fund

PE

State

PE

Bond

ROW Bond

CST State

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway Underway
2005
Year Underway Underway
2005 After 2007
Year Underway Underway
2005 After 2007
Year Underway
2005 After 2007

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2006 After 2007

Phase Fund

PE Slate

PE

Bond

ROW Bond

CST Bond

Year Underway Underway
2007 After 2007

Federal $135,000

State $0

Federal $392,000

State $98,000

Federal

State

$0 $0 Federal
$0 $0

$650,000 $6,200,000
State
$85.000 $6,900,000

Federal

State

$0 Federal

$23,735,000 State

$0 $1,407,000

Federal

State

$0 Federal
$40,000

$680,000 State $10.000

Federal $12,000

State $3,000

Federal

State

$0 $2.750.000

Other $0
Other $0
Other
$0 $0 Other $0 $0 Other
$0 Other
$0 Other
$0 Other
$0
Other $0
Other
$0

Total $135,000
Total $490,000
Total $650,000 $6,200,000 Total
$85.000 $6.900,000
Total
$23,735.000 Total
$1,407,000 Total $680,000 Total $50.000
Total $15.000
Total $2,750.000
Page 130 of 300





STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Evans
Project: 0002302 Type Work: Streetscapes Descp: CLAXTON STREETSCAPE PROJECT

LUMP SUM PROJECT

Length: 0.00 T/P#:

Project: 0006556 Type Work: Streetscapes

Descp: CLAXTON TRANSPORTATION & STREETSCAPE

PROJECT - PHASE II

Length: 0.00

LUMP SUM PROJECT

T/P#:

Project: 522105. Type Work: Widening

Descp: SR 30/CLAXTON FM WEST eTY LMTS TO EAST

eTY LMTS

Lanes: Exist. 2 Prop. 5

Length: 1.51

TlP#:

Phase Fund CST STP

Year LUMP

Federal $250,000

State $0

Phase Fund CST STP

Year LUMP

Federal $400,000

State $0

Phase PE ROW ROW CST

Fund State State RRBS RRBS

Year Underway Underway
2006 2007

Federal

State

$0 $3,982,000 $0 $7,390,000

Other $62,500
Other $100,000
Other
$0 $0

Total $312,500
Total $500,000
Total
$3,982,000 $7,390,000

Page 131 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5

Fannin

Project: 0006610 Type Work: Streets capes Descp: BLUE RIDGE MAIN STREET STREETSCAPE
IMPROVEMENT PROJECT Length: 0,00

LUMP SUM PROJECT

TlP#:

Project: 642165- Type Work: Replace Bridge

Descp: SR 60 OVER SKEENAH CREEK & CHAPEL

BRANCH {PIPE ONLY}

Length: 0.27

TIP#:

Phase Fund CST STP

Year LUMP

Federal $400,000

State $0

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway
2005

Federal $1,064,800

State $266,200

Other $100,000
Other $0

Total
$500,000
Total
$1,331,000
Page 132 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM zaLZQQ5

Fayette

Project: 0000399 Type Work: Intersection Improvement

Descp: SR 92 BET CR 204/HILO RD & CR 375/KINGWOOD

DRIVE-- TURN LANE

Length: 0.20

LUMP SUM PROJECT

TIP#: ARC NOT A

Project: 0002305 Type Work: Bridges

Descp: PEACHTREE CITY WEST VILLAGE MULTI-USE

BRIDGE

Length: 0.00

LUMP SUM PROJECT

TIP#: AR-384ABC

Project: 0004483 Type Work: Landscaping

Descp: SR 54 WEST BRIDGE/GATEWAY FY 2004 LCI

PROJECT

Length: 0.00

LUMP SUM PROJECT

TIP#: FAARI79

Project: 0005568 Type Work: Replace Bridge Descp: SR 92 @ FLINT RIVER 6.6 MILES W OF GRIFFIN

Length: 0.40 TIP#: SP-009

Project: 0008271 Type Work: BicyclelPed. Facility

Descp: MULIT-USE PATH OVER CSX AND ALONG SR 54

CULVERTS-LCIPROJ

Length: 0.40

LUMP SUM PROJECT

TIP#: FA-AR 180

Project: 0006272 Type Work: Parking Areas
Descp: SR 54/LANIER AVE FM DOWNTOWN AREA TO LAFAYETIE PARK - LCI Length: 0.00

LUMP SUM PROJECT

TIP#: FA-AR 181

Project: 0008592 Type Work: Sidewalks

Descp: GRADY AVENUE TRAIL & STONEWALLIBOOKER

SIDEWALKS

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006593 Type Work: Landscaping

Descp: SR 54 EAST LANDSCAPE ENHANCEMENTS -

PHASE IV

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006643 Type Work: Multi-use Trail Descp: HANDLEY PARK TO ANTHONY DRIVE EAST OF
TYRONE CONNECTOR Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006726 Type Work: Sidewalks Descp: FAYETIEVILLE CONNECTING SIDEWALKS

Length: 0.00 TIP#: FA-AR-BP05

Project: 322350. Type Work: Widening

Descp: SR 74 FM JUST SOUTH OF CROSSTOWN RD NW

TOSR 54 Lanes: Exist. 2

Prop. 4

Length: 2.65

TlP#: FA-074AI

Phase PE ROW CST

Fund STP STP STP

Phase Fund CST STP

Year LUMP LUMP LUMP
Year LUMP

Phase Fund PE STP CST STP

Year Underway
LUMP

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year 2005 After 2007 After 2007

Phase Fund PE STP CST STP

Year LOCL LUMP

Phase PE ROW CST

Fund STP STP STP

Year Underway
LUMP LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund PE Local CST STP

Year LOCL 2007

Phase PE ROW CST

Fund STP STP STP

Year Underway Underway
2006

Federal $31,500
$106,425 $319,500
Federal $200,000

State $3,500
$11,825 $35,500
State $0

Federal $432,000

State $0

Federal $89,600

State $22,400

Federal $20,000
$384,267

State $0 $0

Federal
$336,000 $968,000
Federal $500,000

State
$0 $0
State $0

Federal $168,000

State $0

Federal $320,800

State $0

Federal $0
$504,000

State $0 $0

Federal

State

$7,672,800

$1,918,200

Other $0 $0 $0
Other $50,000
Other $108,000
Other $0
Other $5,000 $96,067
Other $84,000 $242,000 Other $125,000
Other $42,000
Other $80,200
Other $63,000 $126,000
Other
$0

Total $35,000
$118,250 $355,000 Total $250,000
Total $540,000
Total $112,000
Total $25,000
$480,334
Total $420,000 $1,210,000 Total $625,000
Total $210,000
Total $401,000
Total $63,000
$630,000
Total
$9,591.000

Page 133 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM za/ZQQ5

Fayette

Project: 322355- Type Work: Widening

Descp: SR 74 FM SR 85 NW TO JUST SOUTH OF

CROSSTOWN RD Lanes: Exist. 2 Prop. 4

Length: 3.05

TlP#: FA-074BI

Project: 322357-

Type Work: Replace Bridge

Descp: SR 74 @ FLAT CREEK

Lanes: Exist. 2 Prop. 4

Length: 0.25 TIP#: FA-074B2

Project: 333177- Type Work: Replace Bridge Descp: SR 74 @ LINE CREEK COWETA-FAYETTE CO LINE

Length: 0.44 TlP#: CW-031

Project: 333185- Type Work: Replace Bridge

Descp: SR 85 NBL @ MORNING CREEK 3.5 MI N OF

FAYETTEVILLE

Length: 0.57

TlP#: FA-333

Project: 371446- Type Work: Bicycle/Ped. Facility Descp: REDWINE MULTIUSE TRAIL - PHASE 1

Length: 0.00 TlP#: FA-ARBPJ7
Project: 371447. Type Work: Bicycle/Ped. Facility Descp: REDWINE MULTIUSE TRAIL PHASE 3 & 4

Length: 0.00 TIP#:

Project: 721290. Type Work: Widening

Descp: SR 85 FM SR 279/FAYETTE N TO 6-LN @

ROBERTS DR/CLAYTON

Lanes: Exist. 4 Prop. 6

Length: 4.00

TIP#: CLOIS

Project: 721440- Type Work: Widening

Descp: SR 54 FM MCDONOUGH RD/FAYETT NE TO SR

3/US 19/41/CLAYTON CO

Lanes: Exist. 2 Prop. 4

Length: 7.16

TlP#: CL04IB

Project: 742870. Type Work: Widening

Descp: SR 920 FROM SR 54 TO SR 3/US 19 (REL SR 81)&

FAYETTE

Lanes: Exist. 2 Prop. 4

Length.' 5.73

TlP#: CL-JOI

Project: TOO0596 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR FAYETTE
COUNTY Length: 0.00
TlP#: ARFAS310

Project: TOO0993 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR FAYETTE
COUNTY Length: 0.00
TlP#: ARFAS310

Phase Fund PE STP ROW STP CST STP

Year Underway
2006 2007

Phase Fund

PE

Bridge

CST Bridge

Year Underway
2007

Federal
$5,584,000 $8,080,000

State
$1,396,000 $2,020.000

Federal $623,000

State $752.000

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2006 2007 2007
Year Underway Underway
2006

Phase Fund PE Local CST STP

Year LOCL 2005

Federal
$118,400 $844,800 $1.364.800 Federal
$2,123,200
Federal $0
$240.000

State
$29.600 $211,200 $341.200 State
$530,800
State $0 $0

Phase Fund PE Local ROW Local CST STP

Year LOCL LOCL 2005

Federal $0 $0
$240,000

State $0 $0 $0

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Federal $1.920,000

State $0

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Federal $4,006,400

State $1.001,600

Phase Fund PE STP ROW STP CST STP

Year 2006 After 2007 After 2007

Federal $1.000.000

State $250.000

Phase Fund CST Transit

Year 2005

Federal $16,017

State $4.004

Phase Fund CST Transit

Year 2006

Federal $16,818

State $4.204

Other $0 $0
Other $0
Other $0 $0 $0
Other
$0
Other $30.000 $60,000
Other $0 $0
$60.000
Other $480,000
Other $0
Other $0
Other $0
Other $0

Total $6,980,000 $10.100.000
Total $1.375.000
Total $148.000 $1,056,000 $1,706.000 Total
$2.654,000 Total $30.000 $300.000
Total $0 $0
$300,000 Total $2,400,000
Total $5.008,000
Total $1.250.000
Total $20.021
Total $21.022
Page 134 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM W12DD5

Fayette
Project: T001274 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR FAYETTE
COUNTY Length: 0.00
TIP#: AR.FA.5310

Phase Fund CST Transit

Year 2007

Federal $17,658

State $4,415

Other $0

Total $22.073

Page 135 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM Za12QQ5

Floyd

Project: 0000401 Type Work: Widening

Descp: SR 101 WIDENING FM CR 57/PLEASANT HOPE RD

TO S ROME BYPASS Lanes: Exist. 2 Prop. 4

Length: 3.53

TlP#:

Project: 0003771 Type Work: Signals

Descp: SR 101 @ EAST 9TH STREET - UPGRADE TRAFFIC

SIGNALS & PED

Length: 0.40

LUMP SUM PROJECT

TlP#:

Project: 0003786 Type Work: Intersection Improvement
Descp: SR 53/CALHOUN HIGHWAY AT CR 159/BURLINGTON ROAD Length: 0.35

LUMP SUM PROJECT

TlP#:

Project: 0004593 Type Work: Water Pollution Mitig.
Descp: 1991 STREAM CREDITS FOR PI 621600-1662420-/EDS-27( 154)&( 127) Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0005931 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS
LOCATIONS IN FLOYD COUNTY Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 620590- Type Work: Widening

Descp: SR 1!US 27 IN ROME FM 5TH AVE TO JOHN

DAVENPORT DR

Lanes: Exist. 4 Prop. 5

Length: 0.20

TlP#: L-85-11

Project: 621600- Type Work: New Construction

Descp: S ROME BYP/US 27 FM SR 1 ALONG BOOZE MTN

RD TO SR 101 @CR 96

Lanes: Exist. 0 Prop. 4

Length: 3.90

TIP#: 5-89-2\

Project: 621660- Type Work: New Construction

Descp: WEST ROME BYP FM N OF BLACKS BLUFF RD TO

SR20@CR262

Lanes: Exist. 0 Prop. 4

Length: 5.70

TIP#: 5-92-24

Project: 621670- Type Work: New Construction

Descp: SW ROME BYP FM PROP W ROME BYP @ CR 638

TO SR 1 @ CR 633&BRD

Lanes: Exist. 0 Prop. 4

Length: 4.60

TlP#: 5-92-23

Project: 632750- Type Work: Widening

Descp: SR 1fTURNER MCCALL BLVD FM RIVERBEND DR

TO MLK BLVD (SR53) Lanes: Exist. 4 Prop. 6

Length: 0.29

TlP#: 592-23

Phase PE ROW CST

Fund STP STP STP

Year 2007 After 2007 After 2007

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund ROW STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2005

Phase Fund

PE State

PE

Bond

ROW Bond

ROW Bond

ROW Bond

ROW Bond

ROW Bond

CST State

Phase Fund

ROW NHS

ROW NHS

CST NHS

Year Underway Underway Underway
2005 2006 2007 After 2007 After 2007 Year Underway 2007 After 2007

Phase Fund ROW STP ROW STP ROW HPP CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 2007 2005 After 2007
Year Underway
2007 After 2007

Federal $792,800

State $198,200

Federal $120,000

State $30,000

Federal
$211,500 $355,500
Federal $64,000

State
$23,500 $39,500
State $16,000

Federal $1,600,000

State $400,000

Federal

State

$3,140,800 Federal

$785,200 State

$0 $5,000,000 $0 $5,000,000 $0 $7,481,000

Federal $4,000,000

State $1,000,000

Federal $6,760,000 $3,057,600 $6,696,000

State $1,690,000
$764,400 $1.674,000

Federal $288,000 .

State $72,000

Other $0
Other $0
Other $0 $0
Other $0
Other $0
Other
$0 Other
$0 $0 $0
Other $0
Other $0 $0 $0
Other $0

Total
$991,000
Total
$150,000
Total
$235,000 $395,000
Total
$80,000
Total $2,000,000 Total
$3,926,000
Total $5,000,000 $5,000,000
$7,481,000
Total $5,000,000 Total $8,450,000
$3,822,000
$8.370.000
Total $360,000 Page 136of 300



STATE TRANSPORTA TION IMPROVEMENT PROGRAM 2a/2QQ5

Floyd

Project: 642395. Type Work: Replace Bridge

Descp: SR 156 @ JOHNS CREEK ON FLOYDGORDON CO

LINE

Length: 0.36

TIP#:

Project: 642405. Type Work: Replace Bridge

Descp: SR 100 @ COOSA RIVER 0.3 MI SOUTH OF JCT

WITHSR20

Length: 1.16

TlP#:

Project: 650360. Type Work: Widening

Descp: CR 373/RIVERSIDE PKWY FM SITURNER MCCALL

TO N ROME CONN Lanes: Exisl. 2 Prop. 4

Length: 1.54

TlP#: L-89-03

Project: 650540. Type Work: Widening

Descp: SR 101/2ND AVENUE FROM WEST 3RD STREET

TO SR 1120 Lanes: Exist. 4 Prop. 5

Length: 0.41

TlP#: 05-01

Project: 662340. Type Work: Widening

Descp: CR 373/RIVERSIDE PKWY/ROME FM BROAD ST

TO TURNERMCALL BLVD

Lanes: Exist. 2 Prop. 3

Length: 0.25

TlP#: L-85-20

Project: 662420. Type Work: Widening

Descp: SE ROME BYP/SR 746 FM SR 101 NE ALONG 4

EXIST RDS TO US 411 Lanes: Exist. 2 Prop. 4

Lenglh: 3.50

TIP#: L-8906

Project: TOO0662 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 OPERATING FOR ROME
Length: 0.00 TlP#:
Project: TOO0664 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPTIAL FOR ROME
Length: 0.00 TlP#:
Project: TOO0665 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR ROME
Lenglh: 0.00 TlP#:
Project: TOO0666 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR ROME
Length: 0.00 TIP#:

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Federal $1,556.800

State $389,200

Phase PE ROW CST CST

Fund Bridge Bridge Bridge STP

Phase PE ROW CST

Fund STP STP STP

Year Underway
2007 After 2007 After 2007
Year Underway Underway
2005

Federal $207,200

State $51.800

Federal

State

$6,760.000

$1.690.000

Phase PE ROW CST

Fund STP STP STP

Year Underway
2005 After 2007

Federal $15.200

State $3.800

Phase Fund ROW PR CST PR

Year Underway
2005

Federal $0

State $1.544.000

Other $0
Other $0
Other $0
Other $0
Other $0

Phase Fund

PE State

PE

Bond

ROW State

ROW Bond

ROW Bond

ROW Bond

CST Bond

Phase Fund

CST Transit

Year Underway Underway Underway Underway
2005 2007 After 2007 Year 2005

Federal

State

Other

$0 $5.000.000

$0

$0 $11,397,000

$0

Federal $631,766

State $0

Other $1.302,564

Phase Fund CST Transit

Year 2005

Federal $508,295

State $63.537

Other $63.537

Phase Fund CST Transit

Year 2005

Federal $200,000

State $25.000

Other $25.000

Phase Fund CST Transit

Year 2005

Federal $34.321

State $8.580

Other $0

Total $1.946.000
Total $259.000
Total $8,450.000
Total $19.000
Total $1.544.000
Total
$5.000,000 $11,397,000
Total $1,934.330
Total $635.369
Total $250,000
Total $42.901

Page 137 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Floyd
Project: T000922 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 OPERATING FOR ROME
Length: 0.00 TlP#:
Project: T000924 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPTIAL FOR ROME
Length: 0.00 TIP#:
Project: T000925 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR ROME
Length: 0.00 TlP#:
Project: T000926 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR ROME
Length: 0.00 TIP#:
Project: T001242 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 OPERATING FOR ROME
Length: 0.00 TIP#:
Project: T001243 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPTIAL FOR ROME
Length: 0.00 TIP#:
Project: T001244 Type Work: Transit Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR ROME
Length: 0.00 TIP#:
Project: T001245 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR ROME
Length: 0.00 TIP#:

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Federal $631,766

State $0

Other $1,399,249

Federal $728,000

State $91,000

Other $91,000

Federal $200,000

State $25,000

Other $25,000

Federal $36,038

State $9,009

Other $0

Federal $631,766

State $0

Other $1,526,204

Federal $584,000

State $73,000

Other $73,000

Federal $200,000

State $25,000

Other $25,000

Federal $37,839

State $9,460

Other $0

Total
$2,031,015
Total
$910,000
Total
$250,000
Total
$45,047
Total
$2,157,970 Total
$730,000
Total
$250,000
Total
$47,299
Page 138 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 217/2005

Forsyth

Project: 0000810 Type Work: Intersection Improvement

Descp: SR 9 AT 6 INTERSECTIONS AND SR 20 AT

TRIBBLE RD

Length: 2.40

TlP#: AR-157

Project: 0000811 Type Work: Intersection Improvement Descp: SR 369 AT 6 INTERSECTIONS BT WALDRIP RD
AND DOC BRAMBLETT RD Length: 2.40
TIP#: AR-118

Project: 0000812 Type Work: Intersection Improvement Descp: SR 306/KEITH BRIDGE RD @ SR 53;
SHADBURN/PARKS & WALDRIP RD Length: 0.80
TIP#: AR-157

Project: 0001037 Type Work: Widening

Descp: SR 369 FM SR 9 TO SR 306 INCL NEW

INTERCHANGE AT SR 400

Lanes: Exist. 0 Prop. 4

Length: 1.79

TIP#: FT-062A

Project: 0001757 Type Work: HOV Lanes

Descp: SR 400 FROM 1-285 TO MCFARLAND

ROAD/FORSYTH CO FOR HOV LANES

Lanes: Exist. 8 Prop. 10

Length: 17.06

TlP#: AR-H-400A

Project: 0002392 Type Work: Widening Descp: SR 20 FM SAMPLES RD TO BURGESS RD

Lanes: Exist. 2 Prop. 4

Length: 2.68 TIP#: FT-061D

Project: 0002862 Type Work: Widening

Descp: SR 20 FROM SR 369/CHEROKEE TO SR

3711FORSYTH Lanes: Exist. 2 Prop. 4

Length: 6.37

TIP#: FT-061

Project: 0003682 Type Work: Widening Descp: SR 20 FROM SR 371 TO SR 400

Lanes: Exist. 2 Prop. 4

Length: 8.39 TlP#: AR-920

Project: 0004429 Type Work: Widening

Descp: MCGINNIS FERRY ROAD FROM SARGENT ROAD

TO CHATTAHOOCHEE RIVER

Lanes: Exist. 2 Prop. 4

Length: 5.06

TlP#: FN-2338

Project: 0004430 Type Work: Widening

Descp: SR 20/CUMMING HWY FM PEACHTREE IND BLVD

TO BURGESS ROAD Lanes: Exist. 2 Prop. 4

Length: 4.60

TlP#: GW-020AI

Project: 0004634 Type Work: Widening

Descp: MCGINNIS FERRY ROAD FM SARGENT ROAD TO

MCFARLAND ROAD Lanes: Exisl. 2 Prop. 4

Length: 7.80

TIP#: FN-133A

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 After 2007

Federal $664,000 $3,995,200
Federal $1,177,600

State
$166,000 $0

Other
$0 $998,800

State $294,400

Other $0

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 After 2007

Federal $1,484,000

State $371,000

Other $0

Phase Fund

PE

STP

ROW STP

ROW State

CST STP

Phase Fund

PE

NHS

PE

NHS

ROW Bond

CST NHS

Phase Fund

PE

Local

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Year 2007 After 2007 Underway After 2007
Year 2005 2007 After 2007 Afler2007
Year LOCL 2005 Afler2007 After 2007
Year Underway After 2007 Afler2007

Federal $720,000

State $180,000

Other $0

Federal $4,000,000 $9,120,000

State $1,000,000 $2,280,000

Other $0 $0

Federal $0
$40,000

State $0
$100,000

Other $557,000 $557,000

Federal

State

Other

Phase Fund

PE

STP

ROW STP

ROW STP

ROW STP

ROW STP

CST STP

Phase Fund

ROW Bond

CST RRBS

Year 2006 After 2007 After 2007 After 2007 After 2007 After 2007 Year 2005 2006

Federal $1,760,000

State $440,000

Federal $0 $0

State $8,000,000 $12,600,000

Other $0
Other $0 $0

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year Underway
2006 Afler2007

Federal $0

State $5,000,000

Other $0

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL 2007

Federal $0 $0
$20,177,600

Stare $0 $0
$5,044,400

Other $2,500,000 $5,000,000
$0

Total $830,000 $4,994,000 Total $1,472,000
Total $1,855,000
Total $900,000
Total $5,000,000 $11,400,000
Total $557,000 $697,000
Total
Total $2,200,000
Total $8,000,000 $12,600,000
Total $5,000,000
Total $2,500,000 $5,000,000 $25,222,000

Page 139 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2al2QQ5

Forsyth

Project: 0005958 Type Work: Intersection Improvement Descp: SR 9 AT MARY ALICE PARK/BALDRIDGE/MEADOW
RD Length: 0040

LUMP SUM PROJECT

TlP#.

Phase Fund PE STP ROW STP CST STP

Project: 0006335 Type Work: ATMS/ITS

Descp: ATMS/SR 400 COMMUNIC/SURVEILANCE FM OLD

MILTON TO SR 20

Length: 11.32

TIP#: AR-435A&B

Phase Fund PE NHS CST Bond

Project: 0006586 Type Work: Multi-use Trail

Descp: FOWLER PARK FROM SR 9 TO MCGINNIS FERRY

ROAD

Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund CST STP

Project: 0006919 Type Work: Bicycle/Ped. Facility

Descp: CR 450/JAMES BURGESS RD FM OLD ATLANTA

RD TO RIVER MIST DR

Length: 2.63

TlP#: FT-AR-BPOO

Phase Fund PE Local ROW Local CST STP

Project: 0006945 Type Work: Miscellaneous Improvement
Descp: SR 369 FM CHEROKEE CO TO HALL CO CENTERLINE RUMBLE STRIPS Length: 19.75

LUMP SUM PROJECT

TlP#:

Phase Fund PE STP CST STP

Project: 121980- Type Work: Widening

Descp: SR 141 FM 0.6 MI NORTH OF FULTON CO LINE TO

SR9

Lanes: Exist. 2 Prop. 4

Length: 6.81

TlP#: FT-002A&B

Phase Fund PE STP ROW STP CST STP CST Bond

Project: 132985- Type Work: Replace Bridge

Descp: SR 20/CUMMING HWY @ CHATTAHOOCHEE

RIVER @ FORSYTH CO LINE

Lanes: Exist. 2 Prop. 4

Length: 0040

TlP#: GW-020A2

Project: 141880- Type Work: Widening

Descp: BETHELVIEW RD/SR 1005 FM SR 9 TO SR 20

INCLUDE SR 20 INT.

Lanes: Exist. 2 Prop. 4

Length: 6.11

TIP#: FT-OOS

Project: 141890- Type Work: Widening Descp: SR 9 FROM SR 20 TO SR 306 RELOCATION

Lanes: Exist. 2 Prop. 4

Length: 2.85 TIP#: FT-OOIE

Project: 142260- Type Work: Replace Bridge Descp: SR 369/MATT ROAD @ SETTINGDOWN CREEK 6
MI N OF CUMMING Length: 0040
TlP#: FT-060

Project: 722010- Type Work: Widening

Descp: SR 400 FROM SR 140/HOLCOMB BRIDGE ROAD

TO MCFARLAND ROAD

Lanes: Exist. 6 Prop. 8

Length: 8.99

TlP#: FN-AR-400A

Phase Fund PE Bridge ROW Bridge CST Bridge CST STP
Phase Fund PE STP ROW STP CST STP

Phase Fund PE STP ROW STP CST STP

Phase Fund PE Bridge ROW Bridge CST Bridge

Phase Fund

PE

NHS

CST Bond

Year Underway
LUMP LUMP
Year 2006 2007
Year LUMP
Year LOCL LOCL 2007
Year LUMP LUMP
Year Underway Underway
2006 2006 Year Underway 2006 After 2007 After 2007 Year Underway 2007 After 2007
Year 2007 After 2007 After 2007
Year Underway
2006 After 2007
Year 2005 2007

Federal
$1,068,300 $936,900

State

Other

$118,700 $104,100

$1,500,000 $0

Federal $120,000
$0

State $30,000 $11.000,000

Other $0 $0

Federal $880,800

State $0

Other $220,200

Federal $0 $0
$728,000
Federal $11,700
$117,000

State $0 $0 $0

Other $90,000 $100,000 $182,000

State $1,300
$13,000

Other $0 $0

Federal

State

Other

$7,996,000 $0
Federal

$1,999,000 $11,005,000
State

$412,000

$103,000

$0 $0 Other
$0

Federat $3,864,000

State $966,000

Other $0

Federat $4,000

State $1,000

Other $1,690,000

Federat $12,000

State $3,000

Other $0

Federal $1,600,000
$0

State $400,000 $33,000,000

Other $0 $0

Total $2,687,000 $1,041,000
Total $150,000 $11,000,000
Total $1,101,000
Totat $90,000 $100,000 $910,000
Total $13,000 $130,000
Total
$9,995.000 $11,005,000
Total $515,000
Total $4,830,000
Total $1,695.000
Total $15,000
Total $2.000,000 $33,000,000
Page 140 of 300



.'

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 217/2005

Forsyth

Project: 742920.

Type Work: Bridge Rehab

Descp: CR 1319/MCGINNIS FERRY RD @

CHATTAHOOCHEE RVRlFORSYTH/GWINET

Lanes: Exist. 2 Prop, 4

Length: 0,60

TIP#: FN.233C

Phase Fund

PE

STP

CST STP

Year 2005 2007

Federal $160,000 $1,600,000

State $40,000 $400,000

Other $0 $0

Total $200,000 $2,000,000

Page 141 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I2QQ5

Franklin

Project: 0003898 Type Work: Landscaping

Descp: LANDSCAPING ON 1-85 IN FRANKLIN AND HART

COUNTIES

Length: 3.25

LUMP SUM PROJECT

TlP#:

Project: 0006421 Type Work: Barriers

Descp: 1-85CABLE MEDIAN BARR,IERS IN HART &

FRANKLIN COUNTY

Length: 23.68

LUMP SUM PROJECT

TlP#:

Project: 0006489 Type Work: Railroad Crossing Descp: CS 800/CORNOG ROAD @ HRT #717525C

LUMP SUM PROJECT

Length: 0.20 TlP#:

Project: 110690-

Type Work: Widening

Descp: 1-85 FM N/SR 51 TO N/SR 320

Lanes: Exist, 4 Prop. 6

Length: 4.10 TlP#:

Project: 110700- Type Work: Widening Descp: 1-85 FM N/SR 320 TO N/SR 17

Lanes: Exist. 4 Prop. 6

Length: 9.30 TlP#:

Project: 110710. Type Work: Widening Descp: 1-85 FM N/SR 17 TO S/SC STATE LINE IN HART

Lanes: Exist. 4 Prop. 6

Length: 6.10 TlP#:

Project: 133001. Type Work: Replace Bridge Descp: SR 145@NORTH FORK BROAD RVR & SR 51
@MIDDLE FORK BROAD RVR Length: 0.47
TIP#:

Project: 142270. Type Work: Replace Bridge Descp: SR 51 @ NAILS CREEK 8.3 MI WEST OF
CARNESVILLE Length: 0.19
TlP#:

Phase Fund CST STP

Year LUMP

Federal $449,600

State $112,400

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $1,688,400

State $187,600

Phase Fund

PE

STP

CST STP

Year LUMP LUMP

Federal $6,000
$140,000

State $0 $0

Phase Fund

PE

NHS

PE

NHS

CST Bond

Year Underway
2005 After 2007

Phase PE PE CST

Fund NHS NHS Bond

Year Underway
2005 After 2007

Phase Fund

PE

NHS

PE

NHS

ROW Bond

CST Bond

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 After 2007 After 2007
Year Underway
2006 After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 After 2007

Federal $1,440,000
Federal $3,360,000
Federal $1,840,000
Federal $24,000
Federal $8,000

State $360,000
State $840,000
State $460,000
State $6,000
State $2,000

Other $0
Other $0
Other $0 $0
Other $0
Other $0
Other $0
Other $0
Other $0

Total $562,000
Total $1,876,000
Total $6,000
$140,000 Total $1,800,000 Total $4,200,000 Total $2,300,000 Total $30,000 Total $10,000
Page 142 of 300



-

STATE TRANSPORTATION IMPROVEMENT PROGRAM za12QQ5

Fulton
Project: 0000066 Type Work: Landscaping Oescp: SR 166 LANDSCAPING FROM 1-285 TO 1-75

LUMP SUM PROJECT

Lenglh: 6.00 TlP#: 1':0 TIP

Project: 0000103 Type Work: Bicycle/Ped. Facility

Oescp: ROGERS BRIDGE ROAD MULTI-USE TRAIL

PROJECT

Length: 0.00

LUMP SUM PROJECT

TIP#: AR384ABC

Project: 0000104 Type Work: Streetscapes Oescp: CRABAPPLE STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TIP#: AR-384ABC

Project: 0000184 Type Work: Sidewalks

Oescp: ATLANTA - LAKEWOOD HEIGHTS TOWN CENTER

STREETSCAPE

Length: 0.00

LUMP SUM PROJECT

TlP#: AR-384ABC

Project: 0000186 Type Work: Sidewalks

Oescp: ATLANTA - CHESHIRE BRIDGE ROAD

STREETSCAPE

Length: 0.00

LUMP SUM PROJECT

TlP#: AR-384ABC

Project: 0000191 Type Work: Bicycle/Ped. Facility Oescp: FAIRBURN RD SIDEWALK/BIKE LANES

LUMP SUM PROJECT

Length: 0.00 TlP#: AR-384ABC

Project: 0000194 Type Work: Bicycle/Ped. Facility Oescp: ATLANTA SOUTHTOWNE TRAIL PHASE 1

LUMP SUM PROJECT

Length: 0.00 TlP#: AR-384AI3C

Project: 0000198 Type Work: Intersection Improvement Oescp: SR 9 IN ROSWELL AT OXBO STREET

LUMP SUM PROJECT

Length: 0.20 TlP#: AR-157

Project: 0000199 Type Work: Intersection Improvement Oescp: SR 9 IN ROSWELL AT OAK STREET

Lanes: Exist. 0 Prop. 4 LUMP SUM PROJECT

Length: 0.28 TIP#: AR-157

Project: 0000200 Type Work: Historic Preservation Oescp: COLLEGE PARK RAIL DEPOT RESTORATION

LUMP SUM PROJECT

Length: 000 TlP#: AR384AI3C

Project: 0000248 Type Work: Intersection Improvement Oescp: SR 9IROSWELL ROAD AT DUNWOODY PLACE

Length: 0.20 TlP#: FN19IA

Phase Fund CST STP

Year LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL Underway

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Phase Fund ROW Local CST STP

Year LOCL LUMP

Phase Fund ROW Local CST STP

Year LOCL LUMP

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Phase Fund

PE

HPP

ROW HPP

CST HPP

Year Underway Underway
2005

Federal $449,600
Federal $0
$840,000
Federal $0
$1.100,000
Federal $0 $0
$300,000
Federal $0 $0
Federal $80,000
$300,000
Federal $0 $0
$440,000
Federal $0
$1,294,830
Federal $0
$1,278,090
Federal $0 $0
$236,000
Federal
$1,600,000

State $112,400
State $0 $0
State $0 $0
State $0 $0 $0
State $0 $0
State $0 $0
State $0 $0 $0
State $0
$143,870
State $0
$142.010
State $0 $0 $0
State
$400,000

Other $0
Other
$0 $210,000
Other $0
$275,000
Other $0 $0
$75,000
Other $0 $0
Other $20,000 $75,000
Other $0 $0
$110,000
Other $0 $0
Other $0 $0
Other $0 $0
$59,000
Other
$0

Total $562,000
Total $0
$1.050.000
Total $0
$1,375,000
Total $0 $0
$375,000
Total $0 $0
Total $100,000 $375.000
Total $0 $0
$550,000
Total $0
$1,438.700
Total $0
$1,420.100
Total $0 $0
$295,000
Total
$2,000,000

Page 143 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM Za12QQ5

Fulton
Project: 0000249 Type Work: Intersection Improvement Descp: SR 9/ROSWELL ROAD AT NORTHRIDGE ROAD
Length: 0.20 TlPII: FN-1910
Project: 0000252 Type Work: Intersection Improvement Descp: SR 140/HOLCOMB BRIDGE ROAD AT HOUZE
ROAD/ALPHARETTA HIGHWAY Length: 0.20 TlPII: FN-19IE
Project: 0000259 Type Work: Intersection Improvement Descp: JONES BRIDGE ROAD/CR 65 AT DOUGLAS ROAD
Length: 0.20 TtPII: FN-19IL
Project: 0000260 Type Work: Intersection Improvement Descp: JONES BRIDGE ROAD/CR 65 AT SARGENT ROAD
Length: 0.20 TlPII: FN-19IM
Project: 0000261 Type Work: Intersection Improvement Descp: WEBB BRIDGE ROAD/CR 70 AT PARK BRIDGE
PARKWAY/SHIRLEY BR RD Length: 0.20 TIPII: FN-I92A
Project: 0000265 Type Work: Intersection Improvement Descp: HARDSCRABBLE RD/CR 1330 AT CHAFIN ROAD
Length: 050 TlPII: FN-192H
Project: 0000266 Type Work: Intersection Improvement Descp: MAYFIELD ROAD/CR 1324 AT PROVIDENCE ROAD
Length: 0040 TIPII: FN-I92F
Project: 0000337 Type Work: Sidewalks Descp: EAST WESLEY SIDEWALK FM PEACHTREE RD TO
PIEDMONT RD&BIKE/PED Length: 1.26 TIPII: AT-AR-8P30
Project: 0000338 Type Work: Bicycle/Ped. Facility Descp: WILLEO/COLEMAN ROAD - BIKE/PED FM SR 120
TO COLEMAN RD Length: 0.68 TlPII: FN-AR-8PIO
Project: 0000376 Type Work: Miscellaneous Improvement Descp: ADDED ENFORCEMENT TO REDUCE TRUCK
SPEEDING; TAILGATING; ETC. Length: 0.00 TIPII: AR-3598
Project: 0000377 Type Work. Miscellaneous Improvement Descp: PROMOTIONAL CAMPAIGN TO REDUCE TRUCKS
DURING RUSH HOUR Length: 0.00 TlPII: AR-359A

Phase Fund PE HPP ROW HPP CST HPP

Phase PE PE ROW CST

Fund HPP HPP HPP HPP

Phase Fund PE HPP ROW HPP CST HPP

Phase Fund PE HPP ROW HPP CST HPP

Phase Fund PE HPP PE HPP ROW HPP CST HPP
Phase Fund PE HPP PE HPP ROW HPP CST HPP
Phase Fund PE HPP ROW HPP CST HPP

Phase Fund CST STP

Phase Fund PE Local CST CMAQ
Phase Fund CST NHS

Phase Fund PE NHS CST NHS

Year Underway Underway
2005
Year Underway Underway
2006 2007 Year Underway Underway 2006
Year Underway Underway
2006
Year Underway Underway
2006 2007 Year Underway Underway 2006 2007 Year Underway Underway 2005
Year 2005
Year LOCL 2005
Year 2005
Year Underway
2005

Federal
$1,440,000 Federal
$240,000 $1,600,000
Federal
$488,000 Federal
$440,000 Federal
$236,000 $960,000 Federal
$100,000 $640,000 Federal
$640,000 Federal $1,000,000
Federal $0
$520,800
Federal $400,000
Federal $320,000

State
$360,000 State
$0 $400,000 State
$122,000 State
$110,000 State
$0 $240,000 State
$0 $160,000 State
$160,000 State
$0
State $0 $0
State $100,000
State $80,000

Other
$0 Other
$60,000 $0
Other
$0 Other
$0 Other
$59,000 $0
Other
$25,000 $0
Other
$0 Other $250,000
Other $35,000 $130,200
Other $0
Other $0

Total
$1,800,000 Total
$300,000 $2,000,000
Total
$610,000 Total
$550,000 Total
$295,000 $1,200.000
Total
$125,000 $800,000 Total
$800,000 Total $1,250.000
Total $35.000 $651,000
Total $500,000
Total $400,000
Page 144 of 300



...'''

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM waDD5

Fulton
Project: 0000526 Type Work: Intersection Improvement Descp: FREEMANVILLE ROAD AT PROVIDENCE ROAD

Length: 0.20 T/P#: FN-213
Project: 0000527 Type Work: Intersection Improvement Descp: FREEMANVILLE ROAD AT BIRMINGHAM ROAD

Length: 0.20 TIP#. FN-212
Project: 0000531 Type Work: Intersection Improvement Descp: PROVIDENCE ROAD @ BETHANY ROAD

Length: 0.20 TIP#: FN-208

Project: 0000533 Type Work: Intersection Improvement

Descp: SR 140/ARNOLD MILL ROAD @NEWPROVIDENCE

ROAD

Length: 0.20

T/P#: FN-206

Project: 0000554 Type Work: Roadway Project

Descp: ALEXANDER ST FM NORTHSIDE DR TO WEST

PEACHTREE ST

Length: 0.50

T/P#: AT-188A

Project: 0000568 Type Work: Ride Sharing Descp: UNIVERSITY RIDESHARE PROGRAM: YEAR 5

Lenglh: 0.00 TIP#: AR-700F

Project: 0000589 Type Work: Ride Sharing

Descp: REGIONAL VAN POOL SUBSIDY PROGRAM-50

VAN POOLS: YEAR 2

Length: 0.00

T/P#: AR-296B

Project: 0000603 Type Work: Miscellaneous Improvement Descp: PEDESTRIAN SAFETY; AWARENESS &
PROMOTION CAMPAIGN: PHASE 2 Length: 0.00
TIP#: AT-AR-BP-2

Project: 0000607 Type Work: Sidewalks

Descp: HOLLYWOOD RD SIDEWALKS FM BOLTON RD TO

BANKHEAD HWY/SR 8

Length: 3.23

TlP#: AT-AR-BPI2

Project: 0000609 Type Work: Sidewalks Descp: ROSWELL RD/SR 9 SIDEWALKS FM PEACHTREE
RD TO ATLANTA CITY LI Length: 2.78
TlP#: AT-AR-BP-I

Project: 0000610 Type Work: Sidewalks

Descp: CHILDRESS DR SIDEWALKS FM CASCADE RD TO

CAMPBELLTON RD

Length: 1.34

T/P#: AT-AR-BPI5

Phase Fund PE HPP ROW HPP CST HPP

Phase Fund

PE

HPP

ROW HPP

CST HPP

Phase Fund PE HPP ROW HPP CST HPP

Phase Fund PE HPP ROW HPP CST HPP

Phase Fund PE Bond ROW Bond CST Bond

Phase Fund PE CMAQ

Phase Fund PE CMAQ

Phase Fund PE CMAQ

Phase Fund PE Local ROW Local CST CMAQ
Phase Fund PE Local ROW Local CST Local
Phase Fund PE Local ROW Local CST CMAQ

Year Underway
2006 2007
Year Underway
2005 2006
Year Underway
2006 2007
Year Underway
2006 2007
Year Underway
2005 2005
Year 2007
Year 2007
Year 2007
Year LOCL LOCL 2005
Year LOCL LOCL 2006
Year LOCL LOCL 2005

Federal
$240,000 $640,000

State
$0 $0

Federal
$200,000 $640,000

State
$0 $0

Federal
$280,000 $720,000

State
$0 $0

Federal
$200,000 $560,000

State
$0 $0

Federal
$0 $0

State
$720,000 $7,680,000

Federal $900,000

State $0

Federal $300,000

State $0

Federal $80,000

State $0

Federal $0 $0
$360,000
Federal $0 $0 $0
Federal $0 $0
$185,600

State $0 $0 $0
State $0 $0 $0
State $0 $0 $0

Other $60,000 $160,000
Other $50,000 $160,000
Other $70,000 $180,000
Other $50,000 $140,000
Other $0 $0
Other $0
Other $0
Other $20,000
Other $0 $0
$90,000
Other $0 $0
$572,000
Other $0 $0
$46,400

Total $300,000 $800,000
Total $250,000 $800,000
Total $350,000 $900,000
Total $250,000 $700,000
Total $720,000 $7,680,000
Total $900,000
Total $300,000
Total $100,000
Total $0 $0
$450,000
Total $0 $0
$572,000
Total $0 $0
$232,000

Page 145 of 300

STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM 2a/2005

Fulton

Project: 0000611 Type Work: Sidewalks

Descp: COLLIER RD SIDEWALKS FM HOWELL MILL TO

PEACHTREE RD

Length: 1.25

tte ATARBPI5

Project: 0000639 Type Work: Bicycle/Ped. Facility

Descp: RIVERSIDE DRIVE BIKE/PED FM JOHNSON FERRY

RD TO 1-285

Length: 0.95

TIPt/: FNARBP05

Project: 0000640 Type Work: BicyclelPed. Facility

Descp: RIVER VALLEY RD FM RIVERSIDE DR TO

ABERNATHY RD

Length: 1.27

tie FNARBP06

Project: 0000643 Type Work: Bicycle/Ped. Facility Descp: SHANNON PKWY BIKE/PED FM MALL BLVD TO SR
138 Length: 0.32
TlPt/: FSAR-BP06

Project: 0000675 Type Work: Bicycle/Ped. Facility

Descp: BUFFINGTON RD BIKE LANE FM FLAT SHOALS RD

TO OLD BILL COOK

Length: 1.12

TlPt/: FSARBP08

Project: 0000784 Type Work: Interchange Descp: 1-285/SR 400 INTERCHANGE RECONSTRUCTION &
HOVSYSTEM Length: 0.40
TlPt/: AR-H-900A

Project: 0001298 Type Work: Realignment

Descp: 1-75 NB ATLANTIC STATION:14TH ST BR; RAMP;

WILLIAMS ST RELOC

Length: 0.20

TlPt/: ATAR-224D

Project: 0001317 Type Work: Rail Projects Descp: ATLANTA MULTI-MODAL PASSENGER TERMINAL
PHASE 2; CT 2 Length: 0.00
tte AR120G

Project: 0001319 Type Work: Rail Projects Descp: COMMUTER RAIL PROGRAM MANAGEMENT - 2005

Length: 0.00
tie AR-344A
Project: 0001320 Type Work: Rail Projects Descp: COMMUTER RAIL PROGRAM MANAGEMENT. 2006

Length: 0.00 TlPt/: AR-344B
Project: 0001321 Type Work: Rail Projects Descp: COMMUTER RAIL PROGRAM MANAGEMENT 2006

Length: 0.00
tte AR-3448

Phase Fund

PE

Local

ROW Local

CST CMAQ

Phase Fund

PE

Local

ROW Local

CST CMAQ

Phase Fund

PE

Local

CST CMAQ

Year LOCL LOCL 2005
Year LOCL LOCL 2006
Year LOCL 2006

Federal $0 $0
$160,000
Federal $0 $0
$720,000
Federal $0
$960,000

State $0 $0 $0
State $0 $0 $0
State $0 $0

Phase Fund

PE

CMAQ

ROW Local

CST CMAQ

Year 2005 LOCL 2005

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

Bond

PE

NHS

PE

NHS

ROW NHS

CST NHS

Phase Fund

ROW Bond

CST Bond

Year After 2007 After 2007
2006 After 2007 After 2007
Year 2005 2006

Federal $0 $0
$444,800
Federal $0 $0
$1,118,400
Federal

State $0 $0 $0
State $0 $0 $0
State

$4,000,000 $1,000,000

Federal $0 $0

State $45,200,000 $37,000,000

Phase Fund CST NHS

Year 2007

Federal $12,000,000

State $3,000,000

Phase Fund

PE

Other

Year 2005

Federal $0

State $2,000,000

Phase Fund

PE

Other

Year 2006

Federal $0

State $2,000,000

Phase Fund

Year

Federal

State

Other $20,000 $100,000 $40,000
Other $180,000 $800,000 $180,000
Other $120,000 $240,000
Other $12,000
$0 $111,200
Other $273,000 $290,000 $279,600
Other
$0
Other $0 $0
Other $0
Other $0
Other $0
Other

Total $20,000 $100,000 $200,000
Total $180,000 $800,000 $900,000
Total $120,000 $1,200,000
Total $12,000
$0 $556,000
Total $273,000 $290,000 $1,398,000
Total
$5,000,000
Total $45,200,000 $37,000,000
Total $15,000,000
Total $2,000,000
Total $2,000,000
Total
Page 146 of 300



...-''

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

FUlton

PrOject: 0001757 Type Work: HOV Lanes

Descp: SR 400 FROM 1285 TO MCFARLAND

ROAD/FORSYTH CO FOR HOV LANES

Lanes: Exist. 8 Prop. 10

Length: 17.06

TIP#: ARH400A

Project: 0001758 Type Work: HOV Lanes

Descp: 1-285 FM 1-75iCOBB THRU FULTON TO

1-85/DEKALB FOR HOV Lanes: Exist. 10 Prop. 12

Length: 13.12

T1P#: AR-H-300A

Project: 0001780 Type Work: HOV Lanes

Descp: 1-20FM SR 6/DOUGLAS THRU COBB TO SR

280/FUL TON - HOV LANES

Lanes: EXist. 8 Prop. 10

Length: 8.06

TIP#: ARH200

Project: 0001787 Type Work: Rail Projects
Descp: ATLANTA TO ATHENS RAIL LINE GRADE CROSSING SAFETY UPGRADES Length: 0.00

LUMP SUM PROJECT

TIP#: AR-378

Project: 0001792 Type Work: Interchange

Descp: 1-75 AT 15TH STREET BR & HOV INTERCHANGE

ATLANTIC STATION

Length: 0.50

T1P#: AR-H600A

Project: 0001895 Type Work: Streetscapes Descp: VIRGINIA HIGHLAND STREETSCAPES FM
UNIVERSITY TO FREEDOM PKWY Length: 0.00
TIP#: ATAR-IlP30

Project: 0002165 Type Work: Railroad Crossing

Descp: CS 6021/BAYARD ST IN EAST POINT@ NS #

718006D

Length: 0.40

LUMP SUM PROJECT

T1P#: AR-156

Project: 0002308 Type Work: Bicycle/Ped. Facility Descp: SOUTH FULTON SCENIC BYWAY BICYCLE ROUTE

LUMP SUM PROJECT

Length: 0.00 T1P#: AR384ABC

Project: 0002310 Type Work: Streetscapes

Descp: ROSWELL ROAD TRANSITORIENTED

STREETSCAPE

Length: 0.00

LUMP SUM PROJECT

T1P#: AR-384ABC

Project: 0002312 Type Work: Streetscapes

Descp: PERRY BOULEVARD/HOLLYWOOD ROAD NODE

STREETSCAPE

Length: 0.20

LUMP SUM PROJECT

T1P#: AR-384ABC

project: 0002316 Type Work: Sidewalks Descp: CITY OF ROSWELL - DESIGN/CONSTR.SIDEWALK
ALONG OLD HOLCOMB B Length: 0.00

LUMP SUM PROJECT

T1P#: AR-384ABC

Phase PE PE ROW CST

Fund NHS NHS Bond NHS

Phase PE PE PE PE ROW CST Phase PE ROW CST

Fund Bond NHS NHS NHS Bond NHS
Fund NHS NHS Bond

Year 2005 2007 After 2007 After 2007
Year After 2007 Underway
2006 2007 After 2007 After 2007 Year Underway 2006 After 2007

Federal $4,000,000 $9,120,000

State $1,000,000 $2,280,000

Federal

State

$4,000,000 $4,000,000

$1,000,000 $1,000,000

Federal $5,000,000

State $1,250,000

Phase Fund CST STP

Year LUMP

Federal $125,000

State $0

Phase Fund PE NHS ROW Bond CST Bond

Year 2005 After 2007 After 2007

Phase Fund PE Local CST CMAQ

Year LOCL 2005

Federal $2,400,000
Federal $0
$500,000

State $600,000
State $0 $0

Phase Fund CST STP

Year LUMP

Federal $100,000

State $0

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase Fund CST STP

Year LUMP

Federal $800,000

State $0

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Other $0 $0
Other
$0 $0
Other $0
Other $0
Other $0
Other $20,000 $125,000
Other $0
Other $125,000
Other $200,000
Other $125,000
Other $125,000

Total $5,000,000 $11,400,000
Total
$5,000,000 $5,000,000
Total $6,250,000
Total $125,000
Total $3,000,000
Total $20,000 $625,000
Total $100,000
Total $625,000
Total $1,000,000
Total $625,000
Total $625,000

Page 147 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
2t7I2QQ5

Fulton
Project: 0002649 Type Work: Bicycle/Ped. Facility Descp: JOHN'S CRK GREENWAY/FULTON FM
RIVER/GWINNETT TO FORSYTH-PH 1 Length: 4.70
TIP#: FN-AR-BI'07

Project: 0002754 Type Work: ATMS/ITS

Descp: ATMS:I-285 SURVEIL FM 1-75/CLAYTON NE THRU

FULTN TO 1-20/DEK

Length: 11.45

TIP#: AR-281

Project: 0002800 Type Work: Intersection Improvement
Descp: SR 421US 23/MORELAND AVE @ SR 42 CONN/FREEDOM PARKWAY Length: 0.16

LUMP SUM PROJECT

TlP#: AR-118

Project: 0002844 Type Work: Bicycle/Ped. Facility
Descp: PEACHTREE ST FROM 3RD STREET TO 10TH
STREET (LCI PROJECT) Length: 0.56

LUMP SUM PROJECT

TIP#: AT-AR-230

Project: 0002845 Type Work: BicyclelPed. Facility
Descp: WEST PEACHTREE ST FROM NORTH AVE TO 17TH ST (LCI PROJECT) Length: 0.50

LUMP SUM PROJECT

TlP#: AT-AR-232

Project: 0002904 Type Work: Sidewalks Descp: SR 236/LAVISTA RD FM CHESHIRE BR RD/FL TN
TO BRIARCLIFF RD/DE Length: 1.82
TIP#: DK-AR-BI'OS

Project: 0003162 Type Work: HOV Lanes

Descp: 1-85 FROM RIVERDALE RD NORTH TO 1-75 FOR

HOV LANES Lanes: Exist. 6 Prop. 8

Length: 5.86

TlP#: AR-H-ISOA

Project: 0003495 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN EASTPOINT Length: 0.00

LUMP SUM PROJECT

TlP#: AR-130H

Project: 0003511 Type Work: Transit Projects Descp: GRTA NW CORRIDOR TRANSIT - G.O.

Length: 0.00 TlP#: AR-2SID
Project: 0003512 Type Work: Transit Projects Descp: GRTA NW CORRIDOR TRANSIT - G.O.

Length: 0.00
TIP#: AR-2S18
Project: 0003534 Type Work: Transit Projects Descp: 1-285 FROM CUMBERLAND TO PERIMETER
CENTER TRANSIT Length: 9.37
TlP#: AR-900C

Phase Fund

PE

HPP

ROW HPP

CST HPP

Year Underway
2005 2006

Phase Fund CST Bond

Year 2005

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year 2006 2007 After 2007

Phase Fund

PE

NHS

PE

NHS

ROW Bond

CST NHS

Phase Fund PE STP CST STP

Year 2006 After 2007 After 2007 After 2007
Year LUMP LUMP

Phase Fund ROW Bond CST Bond

Year 2007 After 2007

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year 2005 2006 After 2007

Phase Fund

PE

NHS

ROW Bond

CST Bond

CST Bond

Year 2007 After 2007 After 2007 After 2007

Federal
$2,000,000 $5,120,000

State

Other

$0

$500,000

$0 $1,280,000

Federal $0

State $12,758,000

Other $0

Federal
$0 $116,360
Federal
$0 $1,560,000
Federal
$0 $3,000,000
Federal $16,000 $48,000

State
$0 $12,929

Other
$0 $0

State
$0 $0

Other
$0 $390,000

State
$0 $0

Other
$0 $750,000

State $4,000
$12,000

Other $0 $0

Federal $4,000,000

State $1,000,000

Other $0

Federal $5,600
$640,000

State $1,400
$160,000

Other $0 $0

Federal $0

State $70,200,000

Other $0

Federal $0 $0

State $30,000,000 $32,100,000

Other $0 $0

Federal $3,200,000

State $800,000

Other $0

Total
$2,500,000 $6,400,000 Total $12,758,000 Total
$0 $129,289
Total $0
$1,950,000
Total
$0
$3,750,000 Total
$20,000
$60,000
Total $5,000,000 Total
$7,000
$800,000
Total $70,200,000 Total
$30,000,000
$32,100,000
Totat $4,000,000 Page 148of 300

..'.,' ..-''

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2a/2QQ5

FUlton
Project: 0003539 Type Work: Transit Projects Descp: GRTA PURCHASE OF CLEAN FUEL BUSES FOR
EXPRESS SERVICE-PH 1 Length: 0.00
TIP#: AR-375D

Project: 0003540 Type Work: Transit Projects Descp: GRTA PURCHASE OF CLEAN FUEL BUSES FOR
EXPRESS SERVICE-PH 2 Length: 0.00
TlP#: AR-375D

Project: 0003542 Type Work: Transit Projects

Descp: GRTA FACILITIES TO SUPPORT EXPRESS BUS

SERVICE-YEAR 2

Length: 0.00

TlP#: AR-392

Project: 0003543 Type Work: Transit Projects

Descp: GRTA FACILITIES TO SUPPORT EXPRESS BUS

SERVICE-YEAR 3

Length: 0.00

TIP#: AR-393

Project: 0003544 Type Work: Transit Projects Descp: GRTA-SMART CARD STUDY & IMPLEMENTATION
EXPRESS BUS SERVICE Length: 0.00
TlP#: AR-394A&B

Project: 0003547 Type Work: Transit Projects

Descp: GRTA FACILITIES TO SUPPORT ACCESS

PROGRAM - 2006

Length: 0.00

TlP#: AR-399

Project: 0003548 Type Work: Transit Projects

Descp: GRTA FACILITIES TO SUPPORT ACCESS

PROGRAM - 2007

Length: 0.00

TlP#: AR-400

Project: 0003572 Type Work: Transit Projects

Descp: GRTA PURCHASE OF VEHICLES FOR ACCESS

PROGRAM PHASE 2

Length: 0.00

TlP#: AR-397A

Project: 0003573 Type Work: Transit Projects

Descp: GRTA FACILITIES TO SUPPORT ACCESS

PROGRAM - 2005

Length: 0.00

TlP#: AR-398

Project: 0003764 Type Work: Intersection Improvement
Descp: SR 140/HOLCOMB BRIDGE RD @ 4 LOCS FM OLD ROSWELL TO BARNWELL Length: 1.60

LUMP SUM PROJECT

TlP#: LUMP

Project: 0003765 Type Work: Intersection Improvement Descp: BELL ROAD AT ROGERS CIRCLE ROAD

Length: 0.20 TlP#: FN207

Phase Fund CST Bond

Year 2005

Phase Fund CST Bond

Year 2006

Phase Fund

PE

Bond

ROW Bond

CST Bond

Phase Fund CST Bond

Year 2005 2005 2005
Year 2006

Phase Fund

PE

EARMK

PE

Bond

ROW Bond

CST Bond

Phase Fund CST Bond

Year 2005 2005 2006 2007
Year 2006

Phase Fund CST Bond

Year 2007

Phase Fund CST Bond CST Bond

Year 2005 2006

Phase Fund CST Bond

Year 2005

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase PE ROW CST

Fund HPP HPP HPP

Year Underway
2006 2007

Federal $0

State $1,319,900

Federal $0

State $20,774,600

Federal $0 $0 $0

State $2,000,000 $4,000,000 $14,000,000

Federal $0

State $10,456,250

Federal $700,000
$0 $0 $0
Federal $0

State $0
$218,000 $1,398,000
$94,712
State $375,000

Federal $0

State $375,000

Federal $0 $0

State $1,500,000 $1,500,000

Federal $0

State $1,500,000

Federal $117,000

State $13,000

Federal
$440,000 $1,200,000

State
$0 $0

Other $0
Other $0
Other $0 $0 $0
Other $0
Other $0 $0 $0 $0
Other $0
Other $0
Other $0 $0
Other $0
Other $0
Other $110,000 $300,000

Total $1,319,900
Total $20,774,600
Total $2,000,000 $4,000,000 $14,000,000
Total $10,456,250
Total $700,000 $218,000 $1,398,000
$94,712 Total $375,000
Total $375,000
Total $1,500,000 $1,500,000
Total $1,500,000
Total $130,000
Total $550,000 $1,500,000

Page 149 of 300

STATE TRANSPORTATlON IMPROVEMENT PROGRAM 2/7/2005

Fulton
Project: 0003769 Type Work: Intersection Improvement Descp: KIMBALL BRIDGE ROAD AT WATERS ROAD

Length: 0.20 TIP#: FN-215

Project: 0003775 Type Work: Intersection Improvement

Descp: SR 120/ ABBOnS BRIDGE ROAD @ PARSONS

ROAD

Length: 0.20

T1P#: FN217

Project: 0004166 Type Work: Intersection Improvement

Descp: SR 3/NORTHSIDE DRIVE AT CS 53/COLLIER

RD;CS364; 38; 6; 135

Length: 2.25

LUMP SUM PROJECT

TIP#: AR-IIS

Project: 0004386 Type Work: Transit Facilities Descp: GRTA NW CORRIDOR TRANSIT G.O.

Length: 0.00 T1P#: AR-251A3

Project: 0004388 Type Work: Transit Projects

Descp: GRTA PURCHASE OF VEHICLES FOR ACCESS

PROGRAM - PHASE 3

Length: 0.00

T1P#: AR3978

Project: 0004390 Type Work: Bicycle/Ped. Facility Descp: PEACHTREE STREET FROM 10TH STREET TO 1-85

Length: 1.37 T1P#: AT200

Project: 0004393 Type Work: Bicycle/Ped. Facility

Descp: FOURTEENTH STREET FROM WEST PEACHTREE

ST TO PIEDMONT AVE

Length: 0.57

TIP#: AT-205

Project: 0004394 Type Work: Bicycle/Ped. Facility Descp: DOWNTOWN ATLANTA PEDESTRIAN CORRIDOR
IMPROVEMENTS Length: 0.00
TIP#: AT-206

Project: 0004396 Type Work: Signing Descp: DOWNTOWN AND MIDTOWN ATLANTA
WAYFINDING SIGNAGE SYSTEM Length: 0.00
T1P#: AT-209

Project: 0004397 Type Work: Intersection Improvement Descp: MIDTOWN ATLANTA SIGNAL AND INTERSECTION
IMPROVEMENTS Length: 0.00
TIP#: AT-210

Project: 0004399 Type Work: Intersection Improvement Descp: INTERSECTION IMP AT LINDEN/PONCE DE
LEON/SPRING/PIEDMONT Length: 1.55
T1P#: AT212

Phase Fund

PE

HPP

ROW HPP

CST HPP

Year Underway
2006 2007

Phase Fund

PE

HPP

ROW HPP

CST HPP

Year Underway
2005 2006

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund ROW Bond ROW Bond

Year 2005 After 2007

Phase Fund CST Bond CST Bond

Year 2005 2006

Phase Fund

PE

Local

ROW Local

CST Bond

Phase Fund

PE

Local

CST Bond

Year LOCL LOCL 2005
Year LOCL 2007

Phase Fund PE Bond ROW Local CST Bond

Year Underway
LOCL 2006

Phase Fund

PE

Bond

CST Bond

Year Underway
2006

Phase Fund CST Bond

Year 2006

Phase Fund

PE

Local

ROW Bond

CST Bond

Year LOCL 2006 2007

Federal
$200,000 $560.000

State
$0 $0

Other
$50.000 $140,000

Federal
$200,000 $560,000

State
$50.000 $140.000

Other
$0 $0

Federal
$0 $2.557.800

State
$0 $284.200

Other
$808.200 $0

Federal $0

State $20.000,000

Other $0

Federal $0 $0

State $1.500.000 $1.500,000

Other $0 $0

Federal $0 $0 $0

State $0 $0
$5.167.266

Other $396.136
$0 $1.291,817

Federal $0 $0

State $0
$3.585.354

Other $314,000 $896,338

Federal
$0 $0

State
$0 $2,520.000

Other
$0 $630.000

Federal $0

State $2,224.800

Other $556,200

Federal $0

State $1.600.000

Other $400.000

Federal $0 $0 $0

State $0
$800,000 $1.700.000

Other $148,750 $200,000 $425,000

Total $250,000 $700.000
Total $250.000 $700,000
Total $808,200 $2.842.000
Total $20.000,000
Total $1.500.000 $1.500.000
Totat $396,136
$0 $6,459.083
Total $314,000 $4,481.692
Total $0
$3,150,000
Total $2.781,000
Total $2.000.000
Total $148,750 $1.000.000 $2.125.000
Page 150 of 300



...'''

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Fulton

Project: 0004429 Type Work: Widening

Descp: MCGINNIS FERRY ROAD FROM SARGENT ROAD

TO CHATTAHOOCHEE RIVER

Lanes: Exist. 2 Prop. 4

Length: 5.06

TlP#: FN-2338

Project: 0004436 Type Work: Special Studies

Descp: LIVABLE CENTERS INITIATIVE IMPLEMENTATION

YEAR 3 (LCI PROJ)

Length: 0.00

LUMP SUM PROJECT

TlP#: AR361C

Project: 0004440 Type Work: Special Studies

Descp: CONGESTION MANAGEMENT SYSTEM UPDATE

FY 2005

Length: 0.00

TIP#: AR-468A

Project: 0004453 Type Work: Bicycle/Ped. Facility Descp: MOUNT VERNON HIGHWAY FROM POWERS
FERRY RD TO LAKE FORREST RD Length: 2.27
TIP#: FNARBPOI

Project: 0004460 Type Work: Streetscapes

Descp: LEE STREET STREETSCAPE FM WHITE STREET

EXT TO 120 FY 04 LCI

Length: 0.00

LUMP SUM PROJECT

TlP#: AT AR 229

Project: 0004461 Type Work: Landscaping
Descp: RALPH DAVID ABERNATHY BLVD FM ASHBY ST TO LEE ST LCI PROJ Length: 1.68

LUMP SUM PROJECT

TIP#: ATAR231

Project: 0004463 Type Work: Streetscapes

Descp: ASHBY STREET STREETSCAPE FY 2004 LCI

PROJECT

Length: 0.00

LUMP SUM PROJECT

TIP#: AT AR 234

Project: 0004464 Type Work: Bicycle/Ped. Facility
Descp: PEACHTREE ST PED CROSSING AT POPLARIWALTONIWALL FY04LCI Length: 0.00

LUMP SUM PROJECT

TIP#: AT AR 235

Project: 0004466 Type Work: Landscaping

Descp: GREENBRIAR PARKWAY IMPROVEMENTS FY

2004 LCI PROJECT

Length: 0.00

LUMP SUM PROJECT

TIP#: AT AR 237

Project: 0004467 Type Work: Intersection Improvement

Descp: BARGE ROAD AT CAMPBELLTON ROAD FY 2004

LCI PROJECT

Length: 0.20

LUMP SUM PROJECT

TlP#: AT AR 238

Project: 0004468 Type Work: Intersection Improvement

Descp: SR 154/SR 166/LANGFORD AT CAMPBELLTON RD

FY 2004 LCI PROJECT

Length: 0.00

LUMP SUM PROJECT

TlP#: AT AR 239

Phase Fund ROW Bond CST RRBS

Year 2005 2006

Federal $0 $0

State $8,000,000 $12,600,000

Phase Fund CST STP

Year LUMP

Federal $31,920,000

State $7,980,000

Phase Fund CST STP

Year 2005

Federal $160,000

State $0

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL 2006

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $0 $0
$531,200
Federal
$0 $306,700
Federal
$548,000

State $0 $0 $0
State
$0 $0
State
$0

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Federal $0
$341,800
Federal $0
$144,000
Federal $0
$1,526,400
Federal $0
$224,000
Federal $0
$96,000

State $0 $0
State $0 $0
State $0 $0
State $0 $0
State $0 $0

Other $0 $0
Other $0
Other $40,000
Other $0
$60,000 $132,800
Other $0
$76,680
Other $137,000
Other $0
$85,450
Other $0
$36,000
Other $0
$429,300
Other $0
$64,800
Other $0
$27,000

Total $8,000,000 $12,600,000
Total $39,900,000
Total $200,000
Total $0
$60,000 $664,000
Total $0
$383,380
Total $685,000
Total $0
$427,250
Total $0
$180,000
Total $0
$1,955,700
Total $0
$288,800
Total $0
$123,000

Page 151 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2!712QQ5

Fulton
Project: 0004489 Type Work: Miscellaneous Improvement Descp: FRAMEWORK START UP FUNDS
TRANSPORTATION MTG ASSOCIATION FY05 Length: 0.00
TlP#: AR-71IA

Project: 0004490 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNER-REG TRANS DEMAND
MGT MEDIAIINCENT/EMPL SVC Length: 0.00
TlP#: AR-71IB

Project: 0004491 Type Work: Miscellaneous Improvement Descp: FRAMEWORK PARTNERS - TDM RESEARCH EVAL
& MEASUREMENT FY 2005 Length: 000
TlP#. AR-715A

Project: 0004493 Type Work: Streetscapes

Descp: MARIETTA ST STREETSCAPE FM W MARIETTA ST

TO ATLANTA CITY LMT

Length: 0.00

TlP#: AT-AR-BP30

Project: 0004512 Type Work: Bicycle/Ped. Facility Descp: HERMI'S BRIDGE AT CHATTAHOOCHE RIVER
NEAR WEST PACES FERRY Length: 0.00
TlP#: FN-193

Project: 0004518 Type Work: Ride Sharing Descp: LOCAL TRANSPORTATION MANAGEMENT
(RIDESHARING) PROGRAM- FY 05 Length: 0.00
TIP#: AR-70IA

Project: 0004627 Type Work: Intersection Improvement

Descp: PEACHTREE ST/SR 9 AT BEVERLY ROADIWEST

PEACHTREE ST

Lanes: Exist. 2 Prop. 4

Length: 0.20

TlP#: AT-218

Project: 0004634 Type Work: Widening

Descp: MCGINNIS FERRY ROAD FM SARGENT ROAD TO

MCFARLAND ROAD

Lanes: Exist. 2 Prop. 4

Length: 7.80

TlP#: FN-233A

Project: 0004651 Type Work: Bicycle/Ped. Facility Descp: TENTH STREET FROM PEACHTREE STREET TO
JUNIPER STREET Length: 0.20
TlP#: AT204

Project: 0004689 Type Work: Median Work Descp: SR 141/PTREE RD CORRIDOR IMP-MAPLE DRIVE
TOSR 400 Length: 0.42
TlP#: AT-215A&B

Project: 0004831 Type Work: Streetscapes Descp: PERIMETER CTR STREETS CAPE FM MT VERNON
TO ASHFORD DUNWOODY Length: 0.95
TlP#: DK-323

Phase Fund PE CMAQ

Phase Fund PE CMAQ

Phase Fund PE CMAQ

Phase Fund PE Local ROW Local CST CMAQ

Phase Fund

PE

Local

CST CMAQ

Phase Fund

PE

CMAQ

Phase Fund PE STP ROW Local CST STP

Phase PE ROW CST

Fund Local Local STP

Phase Fund PE Local CST Bond

Phase Fund PE STP ROW Bond ROW Q68 CST Bond

Phase PE ROW CST

Fund Local Local Bond

Year 2005
Year 2005
Year 2005
Year LOCL LOCL 2005
Year LOCL 2006
Year 2005
Year Underway
LOCL 2007
Year LOCL LOCL 2007
Year LOCL 2006
Year 2005 2005 Underway 2005 Year LOCL LOCL 2005

Federal $400,000

State $0

Other $100,000

Federal $6,080,000

State $0

Other $1,520,000

Federal $680,000

State $0

Other $170,000

Federal $0 $0
$1,000,000
Federal $0
$320,000

State $0 $0 $0

Other $150,000 $200,000 $250,000

State $0 $0

Other $100,000
$80,000

Federal $1,100,000

State $0

Other $0

Federal
$0 $1,360,000

State
$0 $340,000

Other
$0 $0

Federal $0 $0
$20,177 ,600

State $0 $0
$5,044,400

Other $2,500,000 $5,000,000
$0

Federal $0 $0

State $0
$979,699

Other $320,000 $253,670

Federal $4,500 $0

State $500
$4,267,000

$0
Federal $0 $0 $0

$2,951,200
State $0 $0
$2,406,400

Other $0 $0
$737,800
Other $192,000 $150,000 $601,600

Total $500,000
Total $7,600,000
Total $850,000
Total $150,000 $200,000 $1,250,000
Total $100,000 $400,000
Total $1,100,000
Total $0
$1,700,000
Total $2,500.000 $5,000,000 $25,222,000
Total $320,000 $1.233,369
Total $5.000
$4.267.000 $3,689,000
Total $192,000 $150,000 $3,008,000
Page 152 of 300



...'''

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005

Fulton

Project: 0005030 Type Work: Transit Projects Descp: GRTA ACTIVITY CENTER SHUTTLE
SYS-OPERATING ASSIST. FY 2005 Length: 0.00
TIP#: AR-650C'

Project: 0005296 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS AT VARIOUS LOCATIONS ALONG SR 14 Length: 0.00

LUMP SUM PROJECT

TIP#: Lump

Project: 0005409 Type Work: Intersection Improvement Descp: CRABAPPLE ROAD AT CHAFFIN ROAD

Length: DAD
TIP#: FN-211

Project: 0005428 Type Work: Intersection Improvement

Descp: OLD ALABAMA ROAD AT OLD ALABAMA

CONNECTOR

Length: 0.20

TfP#: FN-216

Project: 0005448 Type Work: Intersection Improvement

Descp: SR 3721BIRMINGHAM HWY @ PROVIDENCE RD &

NEW PROVIDENCE RD

Length: 0040

TfP#: FN-209

Project: 0005748 Type Work: Railroad Crossing Descp: CS 60221HENRY FORD II AVENUE @ NS#717993W

LUMP SUM PROJECT

Length: 0040 TIP#: Lump

Project: 0005910 Type Work: Bicycle/Ped. Facility
Descp: SIDEWALK ON HAMMOND DRIVE & SANDY SPRING CIRCLE- LCI PROJECT Length: 0.31

LUMP SUM PROJECT

TIP#: Lump

Project: 0005945 Type Work: Realignment Descp: 14TH ST FM SPRING ST TO WEST PEACHTREE ST

Length: 0.20 TfP#: AT-189

Project: 0006239 Type Work: Miscellaneous Improvement

Descp: LUMP SUM LIVABLE CENTERS INITIATIVE FOR PE

RW OR CST: FY05

Length: 0.00

TfP#: AR810B

Project: 0006240 Type Work: Miscellaneous Improvement

Descp: LUMP SUM LIVABLE CENTERS INITIATIVE FOR PE

RW OR CST: FY06

Length: 0.00

TIP#: AR-81IA

Project: 0006241 Type Work: Miscellaneous Improvement

Descp: LUMP SUM LIVABLE CENTERS INITIATIVE FOR PE

RW OR CST: FY07

Length: 0.00

TIP#: AR-81IB

Phase Fund CST CMAQ

Phase Fund CST STP

Phase PE ROW CST

Fund HPP HPP HPP

Phase PE ROW CST

Fund HPP HPP HPP

Phase PE ROW CST

Fund HPP HPP HPP

Phase Fund CST STP

Phase Fund PE STP CST STP
Phase Fund ROW NHS CST NHS
Phase Fund CST STP

Phase Fund CST STP

Phase Fund CST STP

Year 2005
Year LUMP
Year Underway
2006 2007
Year Underway
2006 2007
Year Underway
2006 2007
Year LUMP
Year Underway
LUMP
Year 2005 2006
Year 2005
Year 2006
Year 2007

Federal $1,200,000
Federal $277,600
Federal $80,000
$200,000 Federal $120,000 $536,000 Federal $200,000 $640,000 Federal $175,000
Federal $1,146,400
Federal $2,560,000 $1,360,000
Federal $36,000,000
Federal $10,000,000
Federal $12,000,000

State $0

Other $300,000

State $69,400

Other $0

State
$0 $0

Other
$20,000 $50,000

State
$0 $0

Other
$30,000 $134,000

State
$50,000 $160,000

Other
$0 $0

State $0

Other $0

State $0

Other $286,600

State $640,000 $340,000

Other $0 $0

State $0

Other $9,000,000

State $0

Other $2,500,000

State $0

Other $3,000,000

Total $1.500,000
Total $347,000
Total $100,000 $250,000 Total $150,000 $670,000 Total $250,000 $800,000 Total $175,000
Total $1,433,000
Total $3,200.000 $1,700,000
Total $45,000,000
Total $12,500,000
Total $15,000,000

Page 153 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Fulton

Project: 0006259 Type Work: Landscaping Descp: PIEDMONT AVE FM GA STATE MARTA TO JOHN
WESLEY DOBBS AVE LCI Length: 0.56

LUMP SUM PROJECT

TlP#: AT-227B

Project: 0006260 Type Work: Sidewalks

Descp: HEADLAND ST FM GREENBRIAR PKWY TO CITY

LIMITS - LCI PROJECT

Length: 0.40

LUMP SUM PROJECT

TlP#: ATAR 243

Project: 0006261 Type Work: Intersection Improvement

Descp: BOLTON ROAD AT MARIETTA BOULEVARD - LCI

PROJECT

Length: 0.40

LUMP SUM PROJECT

TlP#: AT-AR 245

Project: 0006267 Type Work: Sidewalks

Descp: STREETSCAPE ON MEDICAL CENTER FM 1285 TO

GLENRIDGE CONN-LCI

Length: 0.20

LUMP SUM PROJECT

TIP#: FN-AR 206

Project: 0006273 Type Work: Sidewalks

Descp: VIRGINIA AVE STREETSCAPE FM W CITY LIMITS

TO DOUG DAVIS- LCI

Length: 0.27

LUMP SUM PROJECT

TlP#: FS-AR 180

Project: 0006274 Type Work: Sidewalks
Descp: ALPHARETTA ST STREETSCAPE FM NORCROSS ST TO HOLCOMB BR - LCI Length: 1.28

LUMP SUM PROJECT

TIP#: FN-AR 208

Project: 0006332 Type Work: ATMS/ITS Descp: ATMS/I-85 S COMMUNIC/SURVEILANCE FM CAMP
CREEK PKWY TO SR 74 Length: 11.04
TIP#: AR-430

Project: 0006335 Type Work: ATMS/ITS

Descp: ATMS/SR 400 COMMUNIC/SURVEILANCE FM OLD

MIL TON TO SR 20

Length: 11.32

TIP#: AR-435A&B

Project: 0006396 Type Work: ATMS/ITS

Descp: ATMS/I-75 N RAMP METERS-HAR FROM 185 TO

WADE GREEN ROAD

Length: 8.02

TlP#: AR-438

Project: 0006397 Type Work: ATMS/ITS Descp: ATMS/I-85 N RAMP METERS-HAR FM BUFORD
HWY TO PLEASANT HILL Length: 16.43
TlP#: AR-439

Project: 0006398 Type Work: ATMS/ITS Descp: ATMS/SR 400 RAMP METERS-HAR FM 1-85TO OLD
MILTONPKWY Length: 19.58
TlP#: AR-440

Phase Fund PE STP CST STP

Year Underway
2007

Federal $988,000

State $0

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $200,000

State $0

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $800,000

State $0

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $70,400
$1,513,600
Federal $1,346,400

State $0 $0
State $0

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $2,011,200

State $0

Phase Fund PE NHS CST NHS

Year 2005 2006

Federal $120,000 $10,400,000

State $30,000 $2,600,000

Phase Fund PE NHS CST Bond

Year 2006 2007

Federal $120,000
$0

State $30,000 $11,000,000

Phase Fund PE NHS CST Bond

Year 2005 2006

Federal $28,000 $0

State $7,000
$2,000,000

Phase Fund PE NHS CST Bond

Year 2005 2006

Federal $40,000 $0

State $10,000 $3,000,000

Phase Fund PE NHS CST Bond

Year 2005 2006

Federal $20,000 $0

State $5,000
$1,500,000

Other $247,000
Other $50,000
Other $200,000
Other $17,600 $378,400 Other $336,600
Other $502,800
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0

Total $1,235,000
Total $250,000
Total $1,000,000
Total $88,000 $1,892,000 Total $1,683,000
Total $2,514,000
Total $150,000 $13,000,000
Total $150,000 $11,000,000
Total $35,000 $2,000,000
Total $50,000 $3,000,000
Total $25,000 $1,500,000
Page 154 of 300



..t')

STATE TRANSPORTATION IMPROVEMENT PROGRAM 27/2005

Fulton

Project: 0006399 Type Work: ATMS/ITS Descp: ATMS/ 1-75/85 RAMP METERS-HAR FM
UNIVERSITY AV TO 10TH ST Length: 4.83
TlP#: AR-441

Project: 0006401 Type Work: ATMS/ITS

Descp: ATMS/I-75 S RAMP METERS-HAR FM HUDSON BR

TO CLEVELAND AVE

Length: 17.35

TIP#: AR-443

Project: 0006402 Type Work: ATMS/ITS

Descp: ATMS/I-20 RAMP METERS-HAR FM THORNTON

RD TO EVANS MILL RD

Length: 30.30

TIP#: AR-444

Project: 0006428 Type Work: Transit Projects

Descp: 1-285 FROM CUMBERLAND TO PERIMETER

TRANSIT CORRIDOR

Length: 9.91

TlP#:

Project: 0006429 Type Work: Transit Projects

Descp: 1-285 FROM CUMBERLAND TO PERIMETER

TRANSIT CORRIDOR

Length: 0.00

TlP#:

Project: 0006457 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN

DOUGLAS/FULTON

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006570 Type Work: Streetscapes Descp: CASCADE-MAYS STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006571 Type Work: Streetscapes Descp: BOLTON/MOORES MILL STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0008572 Type Work: Streetscapes

Descp: ANSLEY PARK PEDESTRIAN & STREETSCAPE

PROJECT

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0008573 Type Work: Streetscapes Descp: SIMPSON ROAD CORRIDOR STREETS CAPE

LUMP SUM PROJECT

Length: 7.28 TlP#:

Project: 0006574 Type Work: Streetscapes
Descp: DECATUR STREET PEDESTRIAN & STREETSCAPEIMPROVEMENTPROJECT Length: 2.67

LUMP SUM PROJECT

TIP#:

Phase Fund

PE

NHS

CST Bond

Year 2005 2006

Phase Fund

PE

NHS

CST Bond

Year 2006 2007

Phase Fund

PE

NHS

CST Bond

Year 2006 2007

Phase Fund

PE

Bond

PE

Bond

ROW Bond

CST Bond

Phase Fund

PE

Bond

CST Bond

Year 2005 2006 After 2007 After 2007
Year 2007 After 2007

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Federal $20,000 $0

State $5,000
$2,000,000

Federal $20,000 $0

State $5,000
$1,500,000

Federal $32,000 $0

State $8,000
$2,500,000

Federal $0 $0

State $5,000,000 $20,000,000

Federal $0

State $11,000,000

Federal $896,000

State $224,000

Federal $500,000

State $0

Federal $500,000

State $0

Federal $500,000

State $0

Federal $600,000

State $0

Federal $700.000

State $0

Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $125,000
Other $125,000
Other $125,000
Other $150,000
Other $175,000

Total $25,000 $2,000.000
Total $25.000 $1,500,000
Total $40.000 $2,500.000
Total $5,000,000 $20,000,000
Total $11.000,000
Total $1.120,000
Total $625,000
Total $625,000
Total $625,000
Total $750,000
Total $875.000

Page 155 of 300

STATE TRANSPORTATlON IMPROVEMENT PROGRAM 2012005

Fulton

Project: 0006575 Type Work: Streetscapes
Descp: ATLANTA METROPOLITAN COLLEGE ENTRYWAY IMPROVEMENT Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006576 Type Work: Streetscapes

Descp: DOWNTOWN EAST POINT STREETSCAPE

PROJECT - PHASE II

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006582 Type Work: Multi-use Trail Descp: BIG CREEK GREENWAY EXTENSION

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0008644 Type Work: Streetscapes Descp: UNION CITY PEDESTRIAN SYSTEM - PHASE II

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006652 Type Work: Streetscapes Descp: CRABAPPLE STREETSCAPE - PHASE II

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006853 Type Work: Multi-use Trail Descp: JOHN LEWIS PLAZA - PHASE II

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006657 Type Work: Intersection Improvement Descp: MT VERNON HWY @ 5 LOCS & PEACHTREE
DUNWOODY RD @NORTHPARK PL Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006683 Type Work: Median Work Descp: SR 141/PTREE RD CORRIDOR IMP FM SR 400 TO
ROXBORO ROAD Length: 1.33
TlP#:
Project: 0006684 Type Work: Median Work Descp: SR 141/PTREE RD CORRIDOR IMP FM
SHADOWLAWN AVE TO MAPLE DR Length: 1.33
TlP#:

Project: 0006688 Type Work: Widening Descp: 1-85 NB VIADUCT @ GA 400 NB - EXIT LANE

Lanes: Exist. 11 Prop. 12

Length: 0.47 TlP#: AT-AR-212A

Project: 0006717 Type Work: Bicycle/Ped. Facility Descp: EAST ATLANTA VILLAGE STREETSCAPES

Length: 0.00 TlP#: AT220

Phase Fund CST STP

Phase Fund CST STP

Phase Fund CST STP

Phase Fund CST STP

Phase Fund CST STP

Phase Fund CST STP

Phase Fund

PE

STP

ROW Local

CST STP

Phase Fund ROW Local CST STP CST STP

Phase Fund ROW Local CST Bond

Phase Fund PE NHS CST NHS

Phase Fund PE Local CST STP

Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP LOCL LUMP
Year LOCL LUMP 2007
Year LOCL 2005
Year 2005 2006
Year LOCL 2007

Federal $200,000

State $0

Other $50,000

Federal $500,000

State $0

Other $125,000

Federal $300,000

State $0

Other $75,000

Federal $500,000

State $0

Other $125,000

Federal $500,000

State $0

Other $125,000

Federal $43,200

State $0

Other $10,800

Federal $1,600 $0
$480,000
Federal $0
$1,338,300 $3,442,875
Federal $0
$604,000

State $400 $0
$120,000

Other $0 $0
$1,800,000

State $0
$148,700 $0

Other $12,510,000
$0 $860,719

State $0
$151,000

Other $2,569,000
$0

Federal $60.000
$6,000.000

State $15,000 $1.500,000

Other $0 $0

Federal $0
$800,000

State $0 $0

Other $277,500 $200,000

Total $250,000
Total $625,000
Total $375,000
Total $625,000
Total $625,000
Total $54,000
Total $2,000 $0
$2,400,000
Total $12,510,000
$1,487.000 $4,303,594
Total $2.569,000
$755,000
Total $75,000 $7,500.000
Total $277,500 $1,000,000
Page 156 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Fulton
Project: 0006718 Type Work: Bicycle/Ped. Facility Descp: BICYCLE/PEDESTRIAN & TRAFFIC CALMING
ENHANCEMENTS @ SEV LOCS Length: 0.00
TIP#: AT-222A
Project: 0006727 Type Work: ATMS/ITS Descp: SR 9/ROSWELL ROAD FM ABERNATHY ROAD TO
FORSYTH COUNTY LINE Length: 17.90
TIP#: FN-199
Project: 0006728 Type Work: Streetscapes Descp: ROSWELL ROAD STREETSCAPE

Length: 0.00 TIP#: FN-AR-BPIO

Project: 0006729 Type Work: Special Studies

Descp: SOUTH FULTON PARKWAY ACCESS

MANAGEMENT PLAN

Length: 000

TIP#: FS-196

Project: 0006755 Type Work: Special Studies Descp: SR 6/CAMP CREEK PKWY FM 1-85TO W HIRAM
PKWY- CORRIDOR STUDY Length: 29.07
TIP#: AR-465

Project: 0006789 Type Work: Special Studies Descp: DOWNTOWN PARKING MANAGEMENT PROGRAM

Length: 0.00 TIP#: AT-223

Project: 0006790 Type Work: Signals Descp: ATLANTA INTERSECTION TIMING & LOOP
DETECTOR INSTALLATION Length: 0.00
TIP#: AT-224

Project: 0006817 Type Work: ATMS/ITS Descp: PERIMETER CENTR FIBER OPTIC
INTERCONNECTION@ SEV LOCS-FUL TON Length: 0.00
TIP#: FN-200

Project: 0006818 Type Work: ATMS/ITS

Descp: WINDWARD PKWY TRAFFIC SIGNAL

INTERCONNECTIONS

Length: 0.00

TIP#: FN-201

Project: 0006819 Type Work: ATMS/ITS

Descp: NORTH POINT PKWY TRAFFIC SIGNAL

INTERCONNECTIONS

Length: 0.00

TIP#: FN202

Project: 0006820 Type Work: ATMSIITS

Descp: SR 140/HOLCOMB BRIDGE RD FM SR 9 TO CR

107IBARNWELL RD

Length: 5.85

TIP#: FN-203

Phase Fund PE Local CST STP

Year LOCL 2006

Phase Fund PE Local CST STP

Year LOCL 2006

Phase Fund

PE

Local

CST STP

Year LOCL 2007

Phase Fund

PE

STP

Year 2006

Phase Fund CST STP

Year 2006

Phase Fund CST STP

Year 2006

Phase Fund CST CMAQ

Year 2006

Phase Fund CST CMAQ

Year 2007

Phase Fund CST CMAQ

Year 2006

Phase Fund CST CMAQ

Year 2006

Phase Fund CST CMAQ

Year 2006

Federal $0
$1,000,000

State $0 $0

Federal $0
$2,800,000

State $0 $0

Federal $0
$697,600

State $0 $0

Federal $320,000

State $0

Federal $600,000

State $0

Federal $140,000

State $0

Federal $800,000

State $0

Federal $539,200

State $0

Federal $920,000

State $0

Federal $856,000

State $0

Federal $600,000

State $0

Other $100,000 $250,000
Other $525,000 $700,000
Other $100,000 $174,400
Other $80,000
Other $150,000
Other $35,000
Other $200,000
Other $134,800
Other $230,000
Other $214,000
Other $150,000

Total $100,000 $1,250,000
Total $525,000 $3,500,000
Total $100,000 $872,000
Total $400,000
Total $750,000
Total $175,000
Total $1,000,000
Total $674,000
Total $1,150,000
Total $1,070,000
Total $750,000

Page 157 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Fulton
Project: 0006821 Type Work: ATMS/ITS Descp: SR 92 FM SR 9 TO COBB COUNTY LINE

Length: 19.17 TlP#: FN-204

Project: 0006822 Type Work: Sidewalks

Descp: SIDEWALKS ALONG CR 4176/CASCADE RD & CS

1057IBEN E MAYS

Length: 0.00

TIP#: AT-AR-BP30

Project: 0006841 Type Work: Special Studies Descp: MARTA -INNER CORE ALTERNATIVES ANALYSIS

Length: 0.00 TIP#: AR-450A&B

Project: 0006842 Type Work: Transit Facilities Descp: MARTA - HE HOLMES TRANSIT STATION LCI
IMPLEMENTATION PROJECT Length: 0.00
TlP#: M-AR-280

Project: 0006845 Type Work: Transit Projects

Descp: MARTA - AUTOMATED FARE COLLECTION

SYSTEM - FY 2006

Length: 0.00

TlP#: M-AR-282B

Project: 0006846 Type Work: Transit Projects

Descp: MARTA - AUTOMATED FARE COLLECTION

SYSTEM - FY 2007

Length: 0.00

TIP#: M-AR-282C

Project: 0006848 Type Work: Transit Facilities Descp: MARTA - HAMILTON GARAGE CNG FACILITY

Length: 0.00
TlP#: M-AR-285
Project: 0006850 Type Work: Transit Projects Descp: MARTA - CLEAN FUEL BUS PROCUREMENT - FY
2006 Length: 0.00
TlP#: M-AR-286B
Project: 0006912 Type Work: Bicycle/Ped. Facility Descp: OLD NATIONAL HWY TRANSIT ORIENTED
DEVELOPMENT IMPLEMENTATION Length: 0.00
TlP#: FS-195
Project: 0006913 Type Work: Median Work Descp: CR 1505/0AKLEY INDUSTRIAL BLVD FM
FAYETTEVILLE RD TO SR 138 Length: 1.71
TlP#: FS-202BI
Project: 0008952 Type Work: Roadway Project Descp: SIMPSON STREET/JONES AVENUE FM
NORTHSIDE DR TO LUCKIE ST Length: 0.48
TlP#: AT-188B

Phase Fund CST CMAQ

Year 2007

Federal $400,000

State $0

Other $100,000

Phase Fund CST CMAQ

Year 2007

Federal $1,040,000

State $0

Other $300,000

Phase Fund PE Local PE Local ROW STP ROW STP CST STP CST STP Phase Fund CST STP

Year 2005 2006 2006 After 2007 After 2007 After 2007 Year 2007

Federal $0 $0
$5,000,000
Federal $106,160

State

Other

$0

$0

$0

$0 $100,000,000

State $0

Other $26,540

Phase Fund CST STP

Year 2006

Federal $8,000,000

State $0

Other $2,000,000

Phase Fund CST STP

Year 2007

Federal $8,000,000

State $0

Other $2,000,000

Phase Fund CST STP

Year 2006

Federal $5,000,000

State $0

Other $1,000,000

Phase Fund CST STP

Year 2006

Federal $2,000,000

State $0

Other $500,000

Phase Fund

PE

Local

ROW Local

CST STP

Phase Fund

PE

Local

ROW Local

CST STP

Phase Fund CST Bond

Year LOCL LOCL 2007
Year LOCL LOCL 2007
Year 2005

Federal $0 $0
$1.000,000

State $0 $0 $0

Other $200,000 $200,000 $250,000

Federal $0 $0
$2,960,000

State $0 $0 $0

Other $320,000 $500,000 $740,000

Federal $0

State $4.618,400

Other $1,154.600

Total $500,000
Total $1,340,000
Total $0
$105,000.000
Total $132,700
Total $10.000,000
Total $10.000,000
Total $6,000,000
Total $2,500,000
Total $200,000 $200,000 $1,250,000 Total $320.000 $500,000 $3.700.000 Total $5,773,000
Page 158 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM Za/2QQ5

Fulton

Project: 0007096 Type Work: Multi-use Trail Descp: CR 1385/BUFFINGTON RD FM 1-85 TO US
29/ROOSEVELT HWY Length: 1.99
TlP#: FS-AR-BP08

Project: 0007133 Type Work: Miscellaneous Improvement

Descp: VARIOUS IMPROVEMENTS IN FULTON COUNTY -

FY 2006

Length: 0.00

TIP#: FN-235

Project: 713330. Type Work: Ramp

Descp: 1285 SOUTH TO 120 WEST INTCHG RCST; WIDEN

&CD Lanes: Exist. 2

Prop. 6

Length: 3.12

TIP#: AT-AR-178

Project: 713370. Type Work: ATMSIITS

Descp: ATMS/I285 SURVEIL FM 1-20 W IN FUL TN N TO

1-75 IN COBB

Length: 6.57

TlP#: AR-279

Project: 713371. Type Work: ATMS/ITS

Descp: ATMS/I-285 SURVEIL FM 1-85/UNION CITY NORTH

TO 1-20WEST

Length: 10.72

TlP#: AR-295

Project: 713372. Type Work: ATMS/ITS

Descp: ATMS/I-285 SURVEIL FM 1-85/UNION CITY-FULTN E

TO 1-75/CLAYTN

Length: 4.11

TlP#: AR-469

Project: 713405- Type Work: ATMS/ITS

Descp: ATMS/I-285 RAMP METERS-HAR FM 1-75IN COBB

E TO 1-85 IN DEK

Length: 13.17

TIP#: AR-241

Project: 713620. Type Work: Widening

Descp: 1-20 FM SR 6ITHORNTON RD/DOUGLAS TO

FULTON INDUST BLVD/FULTO

Lanes: Exist. 6 Prop. 8

Length: 4.94

TIP#: DO-AR-057

Project: 713630. Type Work: Widening Descp: 1-20 FM FULTON INDUSTRIAL BLVD EAST TO 1-285

Lanes: Exist. 8 Prop. 10

Length: 1.72 TlP#: AR-243

Project: 714000 Type Work: Interchange Descp: 1-285 FROM SR 400 TO N SHALLOWFORD RD

Lanes: Exist. 4 Prop. 6

Length: 3.06 TIP#: DK-AR-219

Project: 714080 Type Work: ATMSIITS

Descp: ATMS/I-20 COMM/SURVEI FM SR 6ITHORNTON

RD TO 1-285/FULTON

Length: 5.99

TlP#: AR-447

Phase Fund CST CMAQ

Phase Fund CST HPP

Phase Fund

PE

1M

ROW 1M

CST 1M

Phase Fund

PE

STP

CST Bond

Phase PE PE CST

Fund NHS CMAQ NHS

Phase Fund

PE

NHS

CST NHS

Phase Fund

PE

NHS

CST NHS

Phase PE ROW CST

Fund NHS NHS NHS

Phase PE ROW CST

Fund NHS NHS NHS

Phase Fund

PE

1M

ROW 1M

ROW 1M

CST 1M

Phase Fund

PE

NHS

CST NHS

Year 2006
Year 2006
Year Underway
2007 After 2007
Year Underway
2005
Year 2005 Underway 2006
Year 2005 2006
Year 2005 2006
Year 2006 After 2007 After 2007
Year 2005 2007 After 2007
Year Underway Underway
2007 After 2007
Year 2005 2006

Federal $1,876,000

State $0

Federal $5,600,000

State $1,400,000

Federal $630,000

State $70,000

Federal

State

$0 $11,923,000

Federal $120,000
$6,772,480

State $30,000
$1,693,120

Federal $120,000 $3,361,600

State $30,000 $840,400

Federal $40,000
$1,200,000

State $10,000 $300,000

Federal '$160,000

State $40,000

Federal $120,000 $6,000,000

State $30,000 $1,500,000

Federal

State

$96,873,300 $10,363,700

Federat $120,000 $7,932,695

State $30,000 $1,983,174

Other $469,000

Total $2,345,000

Other $0

Total $7,000,000

Other $0

Total $700,000

Other $0

Total $11,923,000

Other $0
$0
Other $0 $0

Total $150,000
$8,465,600
Total $150,000 $4,202,000

Other $0 $0

Total $50,000
$1,500,000

Other $0

Total $200,000

Other $0 $0

Total $150,000 $7,500,000

Other

Total

$0 $107,237,000

Other $0 $0

Total $150,000 $9,915,869

Page 159 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2al2QQ5

Fulton

Project: 714115- Type Work: Barriers

Descp: 1-20 NOISE BARRIERS FM FULTON IND BLVD TO

H.E. HOLMES (N&Sl

Length: 3.57

TIP#: AR304

Project: 720570. Type Work: Median Work Descp: DL HOLLOWELL PKWY/SR 8 FM PROCTOR CRK
TO E OF CSX RR BRIDGE Length: 0.50
TlP#: AT-004

Project: 721000- Type Work: Widening

Descp: SR 120 FM STATE BRIDGE RD TO PEACHTREE

IND BLVD/GWINNETT Lanes: Exisl. 2 Prop. 4

Length: 6.54

TlP#: FNOO3A

Project: 721308- Type Work: Replace Bridge Descp: SR 140/HOUZE RD OVER LITTLE RIVER @
FULTON/CHEROKEE CO LINE Length: 0.50
TIP#: FN-232B

Project: 721700. Type Work: Replace Bridge Descp: CSX RR BRIDGE OVER SR 3/NORTHSIDE DR

Lenglh: 0.20 TIP#: AT-187

Project: 721960- Type Work: ATMS/ITS Descp: ATMS/ SR 400 COMMUNICAISURVEIL FM S OF 1-85
TO N OF )285 Length: 7.90
TlP#: AR-340

Project: 722010- Type Work: Widening

Descp: SR 400 FROM SR 140/HOLCOMB BRIDGE ROAD

TO MCFARLAND ROAD

Lanes: Exist. 6 Prop. 8

Lenglh: 8.99

TlP#: FN-AR-400A

Project: 722150- Type Work: HOV Lanes Descp: HOV NETWORK PATROUCONTRACT W/LOCAL
LAW ENFORCEMENT OFFICERS Length: 0.00
TIP#: AR-316

Project: 731860- Type Work: Replace Bridge Descp: SR 70/CASCADE-PALMETTO RD @ DEEP CREEK
7.5 MI N OF FAIRBURN Length: 0.27
TlP#: FS138

Project: 731861. Type Work: Replace Bridge Descp: SR 70/FULTON IND. BLVD. @ CAMP CREEK 7.9 MI
N OF FAIRBURN Length: 0.40
TIP#: FS190

Project: 731870- Type Work: Intersection Improvement Descp: SR 9 IN ROSWELL @ KING/CHATTAHOOCHEE
STREETS Length: 0.60

LUMP SUM PROJECT

TIP#: AR157

Phase Fund

PE

NHS

CST NHS

Year Underway
2005

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year Underway
2005 2006

Phase PE ROW CST

Fund STP STP STP

Year 2007 After 2007 After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006

Phase Fund

PE

NHS

CST NHS

Year Underway After 2007

Phase Fund CST TOL

Year 2005

Phase Fund

PE

NHS

CST Bond

Year 2005 2007

Phase Fund CST NHS

Year 2005

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
2005 2006 2006
Year Underway
2005 2006 2006
Year Underway
LOCL LUMP

Federal $6,203,200

State $1,550,800

Federal
$2,400,000 $7,299,200

State
$600,000 $1,824,800

Federal $1,584,800

State $396,200

Federal $80,000
$2,192,000
Federal

State $20,000 $548,000
State

Federal $0

State $6,331,506

Federal $1,600,000
$0

State $400,000 $33,000,000

Federal $1,600,000

State $400,000

Federal
$26,400 $909,600 $348,800 Federal
$24,800 $861,600 $1,493,600 Federal
$0 $1,075,320

State
$6,600 $227,400
$87,200 State
$6,200 $215,400 $373,400 State
$0 $119,480

Other $0
Other $0 $0
Other $0
Other $0 $0
Other
Other $0
Other $0 $0
Other $0
Other $0 $0 $0
Other $0 $0 $0
Other $0 $0

Total $7,754,000
Total $3,000,000 $9,124,000
Total $1,981,000
Total $100,000 $2,740,000 Total
Total $6,331,506
Total $2,000,000 $33,000,000
Total $2,000,000
Total $33,000 $1,137,000 $436,000 Total $31,000 $1,077,000 $1,867,000 Total
$0 $1,194,800
Page 160 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

FUlton

Project: 731875. Type Work: Replace Bridge Descp: NORTHSIDE DR @ NORFOLK SOUTHERN RR
NORTH OF BANKHEAD HWY Length: 0.21
TIP#: AT-186

Project: 742920.

Type Work: Bridge Rehab

Descp: CR 1319/MCGINNIS FERRY RD @

CHATTAHOOCHEE RVRlFORSYTH/GWINET

Lanes: Exist. 2 Prop. 4

Length: 0.60

TlPII: FN-233C

Project: 742976-

Type Work: Replace Bridge

Descp: CR 1385/BUFFINGTON ROAD @ MORNING CREEK

TRIB. E/UNION CITY

Length: 0.15

TlP#: FS-J~2

Project: 742985-

Type Work: Replace Bridge

Descp: SR 154/CASCADE-PALMETTO@ BEAR CREEK 3

MI N OF PALMETTO

Length: 0.27

TlP#: FS-J9J

Project: 751300-

Type Work: Widening

Descp: JOHNSON FERRY RD FM CHATTAHOOCHEE RV

TO ABERNATHY & BRIDGE

Lanes: Exist. 4 Prop. 6

Length: 1.23

TIP#: FN-023

Project: 751310. Type Work: Widening

Descp: ABERNATHY RD FM JOHNSON FERRY RD TO

ROSWELL RD Lanes: Exist. 2 Prop. 4

Length: 0.93

TIP#: FN03~B

Project: 751640. Type Work: Widening

Descp: ABERNATHY ROAD FROM SR 9/ROSWELL RD TO

SR400 Lanes: Exist. 4

Prop. 6

Length: 1.40

TlPII: FN-043

Project: 751650. Type Work: Widening

Descp: OLD ALABAMA RD/SR961 FM HOLCOMB BRIDGE

RD TO JONES BRIDGE RD

Lanes: Exist. 2 Prop. 4

Lenglh: 4.06

TIPII: FN123

Project: 751710 Type Work: Widening

Descp: SR 70/FULTON IND BLVD FM INTERCHANGE DR

TO SR 811NCL CRK BR Lanes: Exist. 2 Prop. 4

Length: 2.10

TIPII: FS-048

Project: 752015

Type Work: Replace Bridge

Descp: COURTLAND ST OVER CSX RR

Length: 0.10
TlPII: AT-070
Project: 752020 Type Work: Replace Bridge Descp: PEACHTREE ST@ GEORGIA RR & MARTA AT
UNDERGROUND ATLANTA Length: 0.50
TlPII: AT-069

Phase Fund

PE

STP

ROW STP

CST STP

Year 2007 After 2007 After 2007

Phase Fund

PE

STP

CST STP

Year 2005 2007

Federal $0

State $1,000,000

Federal $160,000 $1,600,000

State $40,000 $400,000

Phase PE ROW CST

Fund Bridge Local Bridge

Year Undeoway
LOCL 2006

Federal
$0 $708,800

State
$0 $177,200

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

STP

ROW STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW Bond

ROW STP

ROW Bond

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Year Undeoway
2005 2006 2006
Year Undeoway Undeoway
2005 2006
Year Undeoway
2006 2006 2006 2007 Year 2006 After 2007 After 2007

Federal
$16.800 $544,000 $288,000 Federal

State
$4,200 $136,000
$72,000 State

$16,898,400 $7,787,200
Federal

$4.224,600 $1,946,800
State

$0 $7,200.000
$0 $5.092,000
Federal $1.200,000

$50,975,000 $1,800,000 $4,000,000 $1,273,000 State $300,000

Phase Fund

PE

STP

ROW STP

CST STP

Year 2006 After 2007 After 2007

Federal $1,496,000

State $374.000

Phase PE ROW CST

Fund State State State

Year Undeoway Undeoway
2005

Federal

State

$0 $10,329,000

Phase Fund ROW STP CST Bridge

Year LOCL 2007

Federal $0
$636,000

State $0
$159,000

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Undeoway Undeoway
2005

Federal $2,893,600

State $723,400

Other $0
Other $0 $0
Other $500,000
$0
Other $0 $0 $0
Other
$0 $0 Other $0 $0 $0 $0 Other $0
Other $0
Other
$0
Other $400,000
$0
Other
$0

Total $1,000.000
Total $200,000 $2.000,000
Total $500,000 $886,000
Total $21,000 $680,000 $360.000 Total
$21,123,000 $9,734,000 Total
$50,975,000 $9,000,000 $4,000.000 $6,365.000 Total $1,500.000
Total $1,870.000
Total
$10,329.000
Total $400.000 $795,000
Total
$3,617,000

Page 161 of 300

STA TE TRANSPORTA TJON IMPROVEMENT PROGRAM 217/2005

Fulton

Project: 752075- Type Work: Intersection Improvement

Descp: SR 139/MLK JR DR FM HE HOLMES RD TO

BARFIELD AVE

Length: 0.56

TIP#: AT-079B

Project: 752520- Type Work: Replace Bridge Descp: CS 1985/MITCHELL STREET @ SOUTHERN
RAILROAD .2 MI W OF SR 3E Length: 0.29
TIP#. AT-097

Project: 752650- Type Work: Widening

Descp: HAYNES BRIDGE RD FM OLD ALABAMA RD TO

BIG CREEK Lanes: Exist. 2 Prop. 4

Length: 2.37

TIP#: FN-03IA

Project: 752660. Type Work: Widening

Descp: OLD ALABAMA RD FM JONES BRDG RD TO SR

141IMEDLOCK BRDG R Lanes: Exist. 2 Prop. 4

Length: 3.90

TIP#: FN-123B

Project: 752710- Type Work: Replace Bridge

Descp: CS 3498/ATLANTA RD @ CHATTAHOOCHEE

RIVER FULTON-COBB CO LINE

Lanes: Exist. 2 Prop. 4

Length: 0.60

TlP#: CO-104

Project: 752850. Type Work: Replace Bridge

Descp: SR 280/JAMES JACKSON PKWY @ CHATT.

RIVER-SOU RR & APPROACHES

Lanes: Exist. 2 Prop. 4

Length: 1.08

TIP#: AT-108A&B

Project: 752960. Type Work: Replace Bridge Descp: CR 186/HEMBREE ROAD@ FOE KILLER CREEK 2
MI SW OF ALPHARETTA Length: 0.20
TIP#: FN-174A&B

Project: 752970- Type Work: Replace Bridge Descp: CR 133210LD ROSWELL ROAD@ FOE KILLER
CREEK 2.7 MI S OF ALPH Length: 0.20
TIP#: FN-173B

Project: 753054- Type Work: Bicycle/Ped. Facility Descp: GLENRIDGE DRIeR 351 FM ROSWELL RD TO
GLENRIDGE CONN & MEDIAN Length: 1.16
TIP#: FN-I03

Project: 753255- Type Work: Intersection Improvement Descp: FAIRBURN RD FM GARRISON DR TO CSX RR &
SIDEWALKS; BIKE Length: 1.00
TIP#: FS-130

Project: 753280- Type Work: Sidewalks Descp: NEW HOPE RD/CR 473 FM DANFORTH RD TO
CASCADE RD Length: 0.44
TIP#: FS-AR-BP06

Phase Fund

PE

STP

ROW STP

CST STP

Year 2006 2007 After 2007

Federal $103,200 $2,032,000

State $25,800 $508,000

Other $0 $0

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2006

Federal
$0 $12,000,000

State
$0 $3,000,000

Other
$0 $0

Phase Fund PE STP ROW Bond CST Bond

Year Underway
2006 2007

Federal
$0 $0

State
$2,000,000 $2,300,000

Other
$0 $0

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Federal $17,551,200

State $4,387,800

Other $0

Phase Fund

PE

Bond

PE

Bridge

ROW Bond

CST Bond

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Local

CST Bridge

CST STP

Phase Fund

PE

Bridge

CST Bridge

Year Underway Underway
2005 2006
Year Underway
2006 2007 2007
Year Underway
LOCL 2006 2006
Year Underway
2006

Federal

State

Other

$0 $0 Federal
$1,412,000 $5,600,000 $1,600,000
Federal
$0 $364,800 $160,000 Federal
$2,717.600

$500,000 $6,700,000
State

$0 $0
Other

$353,000 $1,400,000
$400,000
State

$0 $0 $0
Other

$0 $91,200 $40,000
State

$1,500,000 $0 $0
Other

$679,400

$0

Phase Fund

PE

Local

ROW Bond

CST Bond

Year LOCL Underway 2005

Phase Fund PE Local ROW STP CST STP

Year LOCL 2005 After 2007

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005

Federal $0
$0

State $0
$3,300,000

Other $0
$0

Federal $0
$176,000

State $0 $0

Other $120,000
$44,000

Federal $0 $0
$125,600

State $0 $0 $0

Other $15.700
$0 $31,400

Total
$12~,OOO
$2,540,000
Total $0
$15,000,000
Total $2,000,000 $2,300,000
Total $21,939,000
Total
$500,000 $6,700,000
Total $1,765,000 $7.000,000 $2.000,000
Total $1.500,000
$456,000 $200,000 Total $3,397,000
Total $0
$3.300.000
Total $120,000 $220,000
Total $15,700
$0 $157,000
Page 162 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I20Q5

FUlton

Project: 753300- Type Work: Sidewalks

Descp: HAMMOND DR FM GLENRIDGE DR TO DEKALB

COUNTY

Length: 0.86

TIP#: FN-AR-BP08

Project: 762520- Type Work: Bicycle/Ped. Facility

Descp: PARKWAY TRAIL PH I-VIRGINIA AVE TO MARTA

RAIL STATION

Length: 1.95

TIPII: FS-AR-BP-02

Project: 762522- Type Work: Bicycie/Ped. Facility Descp: PKWY TRAIL PH IV/CAMP TRUITT RD TO
BRANNON PK TO TUBMAN ELEM Length: 1.16
TlPII: FS-AR-BP-02

Project: 762525- Type Work: Bicycle/Ped. Facility

Descp: PHOENIX TRAIL FM COMMERCE GATEWAY TO

PHOENIX GATEWAY

Length: 0.00

TlPII: FS-AR-BP-03

Project: 762527- Type Work: Sidewalks Descp: DANFORTH RD FM CASCADE RD TO NEW HOPE
RD Length: 1.30
TlPII: FS-AR-BP03

Project: 762530- Type Work: Sidewalks

Descp: METROPOLITAN AVE FM NORTHSIDE DR TO CITY

LIMITS

Length: 0.82

TlP#: AT-159

Project: 762534- Type Work: Sidewalks Descp: SR 3721BIRMINGHAM HWY FM KENSINGTON
FARMS RD TO CRABAPPLE RD Length: 0.46
TIP#: FN-210

Project: 762562 Type Work: Bicycle/Ped. Facility Descp: WEST END RAIL MULTI-USE TRAIL FM SIMPSON
RD TO PRYOR ROAD Length: 0.00
TIP#: AT-AR-BP09

Project: 762590 Type Work: Intersection Improvement Descp: SR 54IUNIVERSITY AVE/MCDONOUGH AT
CAPITOURIDGE/GAMMON AVE Length: 0.14

LUMP SUM PROJECT

TlP#: AR-157

Project: 762601 Type Work: Sidewalks Descp: CITY OF ATLANTA SIDEWALKS @ 6 SCHOOLS/ PH
2 Length: 0.20
TlP#: AT-AR-BP28

Project: 770303- Type Work: Rail Projects Descp: COMMUTER RAIL PROGRAM MANAGEMENT - 2007

Length: 0.00 TlP#:

Phase Fund

PE

Local

CST CMAQ

Year LOCL 2006

Phase Fund ROW Local CST CMAQ

Year LOCL 2006

Phase Fund CST CMAQ

Year 2006

Phase Fund ROW Local CST CMAQ

Year LOCL 2005

Phase Fund ROW Local CST CMAQ

Year LOCL 2006

Phase Fund ROW Local CST CMAQ

Year LOCL 2005

Phase Fund

PE

STP

PE

HPP

ROW HPP

CST HPP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway Underway
2005 2006
Year Underway
LOCL 2005

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

Other

Year 2007

Federal $0
$500,000

State $0 $0

Federal $0
$274,400

State $0 $0

Federal $212,000

State $0

Federal $0
$957,600

State $0 $0

Federal $0
$420,000

State $0 $0

Federal $0
$721,600

State $0 $0

Federal

State

$120,000 $480,000 Federal
$0 $957,600

$30,000 $120,000 State
$0 $0

Federal
$437,400 $665,000

State
$48,600 $0

Federal $0 $0
$957,600

State $0 $0 $0

Federal $0

State $2,000,000

Other $63,000 $125,000
Other $34,000 $68,600
Other $53,000
Other $0
$239,400
Other $0
$105,000
Other $0
$180,400
Other
$0 $0 Other $50,000 $239,400
Other $0
$114,800
Other $120,000 $100,000 $239,400
Other $0

Total $63,000 $625,000
Total $34,000 $343,000
Total $265,000
Total $0
$1,197,000
Total $0
$525,000
Total $0
$902,000
Total
$150,000 $600,000 Total
$50,000 $1,197,000
Total $486,000 $779,800
Total $120,000 $100,000 $1,197,000
Total $2,000,000

Page 163 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM Za/ZQQ5

Fulton

Project: 770311. Type Work: Rail Projects

Descp: ATLANTA MULTIMODAL PASSENGER TERMINAL

PHASE 1; CT 2

Length: 0.00

TlP#: AR120A&B

Project: 770315. Type Work: Rail Projects

Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)

PHASE 1

Length: 0.00

TlP#: AR-269A

Project: 770316- Type Work: Rail Projects

Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)

PHASE 2

Length: 0.00

TlP#: AR-269B

Project: 770321. Type Work: Rail Projects

Descp: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON)

PHASE 2

Length: 0.00

TlP#: AR-268B

Project: 770900. Type Work: Replace Bridge Descp: CS 3101/GRIMES BRIDGE ROAD @ BIG CREEK IN
SOUTH ROSWELL Length: 0.37
TlP#: FN-095

Project: 770933. Type Work: Sidewalks Descp: HOLCOMB BR RD FM OLD HOLCOMBE BR RD TO
E OF SR 400(INCL BRS) Length: 0.59
TlP#: FNI77

Project: 771200. Type Work: Replace Bridge Descp: CR 188/UPPER HEMBREE ROAD @ FOE KILLER
CREEK 2 MI SW OF ALPH Length: 0.20
TlP#: FN-166

Project: 771228. Type Work: Bicycle/Ped. Facility Descp: MANSELL ROAD/CR 126 FROM BIG CREEK TO
MARTA PARKING LOT Length: 2.91

LUMP SUM PROJECT

TIP#: AR-384ABC

Project: 771252. Type Work: Bicycle/Ped. Facility Descp: ATLANTAWEST END RAIL-TRAIL

LUMP SUM PROJECT

Length: 0.00 TlP#: LUMP

Project: 771254. Type Work: Streetscapes Descp: METROPOLITAN PARKWAY STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TIP#: AR-384ABC

Project: 771270. Type Work: Replace Bridge Descp: CR 85/KIMBALL BRIDGE RD @ BIG CREEK 2 MI SE
OF ALPHARETTA Length: 0.20

TlP#: FN165A&B

Phase Fund CST HPP

Year 2005

Federal $3,333,262

State $833,316

Other $0

Phase Fund

PE STP

PE

HPP

CST HPP

Year Underway Underway
2005

Federal

State

$592,000

$148,000

Phase Fund CST HPP

Year 2005

Federal $40,000,000

State $10,000,000

Other
$0 Other
$0

Phase Fund CST NHS

Year 2005

Federal $7,728,000

State $1,932,000

Other $0

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2006

Phase Fund CST CMAQ

Year 2006

Federal
$0 $1,771,200
Federal $417,600

State
$0 $442,800

Other
$250,000 $0

State $0

Other $104,400

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2005

Phase Fund PE Local ROW Local CST STP

Year LOCL LOCL LUMP

Phase Fund PE Local ROW Local CST STP

Year LOCL LOCL LUMP

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Phase Fund PE Bridge ROW Local CST Bridge CST STP

Year Underway
LOCL 2006 2006

Federal
$0 $599,200
Federal $0 $0
$784,800
Federal $0 $0
$400,000
Federal $0 $0
$500,000
Federal
$0 $544,000 $288,000

State

Other

$0 $149,800

$1,500,000 $0

State $0 $0 $0

Other $0 $0
$196,200

State $0 $0 $0

Other $0 $0
$100,000

State $0 $0 $0

Other $0 $0
$125,000

State
$0 $136,000
$72,000

Other
$513,000 $0 $0

Total $4,166,578
Total
$740,000
Total $50,000,000
Total $9,660,000
Total $250,000 $2,214,000
Total $522,000
Total $1,500,000
$749,000
Total $0 $0
$981,000
Total $0 $0
$500,000
Total $0 $0
$625,000
Total $513,000 $680,000 $360,000
Page 164 of 300





STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 217/2005

Fulton

Project: 771273- Type Work: Replace Bridge

Descp: CR 629/JOHNSON ROAD @ PEEKS CREEK 1 MI E

OF PALMETTO

Length: 0.20

TIP#: FS-144

Project: 771275. Type Work: Replace Bridge

Descp: CR 13921COCHRAN MILL ROAD@ PEA CREEK 7

MI NW OF PALMETTO

Length: 0.21

TIP#: FS-140

Project: 771276.

Type Work: Replace Bridge

Descp: CR 13921COCHRAN MILL ROAD @ LITTLE PEA

CREEK NW OF PALMETTO Length: 0.10

TIP#: FS-143

Project: 771363.

Type Work: Miscellaneous Improvement

Descp: REGIONAL VANPOOL SUBSIDY PRGM:APPROX 50

COMMUTER VANPOOLS Length: 0.00

TIP#: AR-296A

Project: MOO1533 Type Work: Resurface & Maintenance

Descp: SR 401/SR 403 FR UNIVERSITY TO BROOKWOOD

1-285/1-75 RAMPS

Length: 13.77

TlP#: AR-IIIG

Project: MOO2385 Type Work: Bridge Painting Descp: PROPOSED BRIDGE PAINTING @ SEV
LOCATIONS IN DEKALB & FULTON Length: 0.00

LUMP SUM PROJECT

TIP#: Lump

Project: MOO2387 Type Work: Bridge Painting

Descp: 1-85& 1-285AT SEVERAL LOCATIONS- PROPOSED

BRIDGE PAINTING

Length: 0.00

LUMP SUM PROJECT

TlP#: Lump

Project: MOO2388 Type Work: Bridge Painting
Descp: 1-20AT SEVERAL LOCATIONS IN FULTON-PROPOSED BRIDGE PAINTING Length: 0.00

LUMP SUM PROJECT

TIP#: Lump

Project: MOO2434 Type Work: Concrete Rehab

Descp: 1-85FM COLLINSWORTH RD/COWETA TO SR

74/FULTON

Length: 4.91

LUMP SUM PROJECT

TIP#: Lump

Project: MOO2912 Type Work: Resurface & Maintenance

Descp: 1-20EB FM SWEETWATER CREEK TO HE HOLMES

RD & 1-285 RAMPS

Length: 8.63

LUMP SUM PROJECT

TlP#:

Project: MOO2970 Type Work: Guardrail Descp: 1-285 FROM WEST PACES FERRY ROAD TO
ASHFORD DUNWOODY ROAD Length: 9.78
TlP#: AR-IIIH

Phase PE ROW CST

Fund Bridge Local Bridge

Phase PE ROW CST

Fund Bridge Local Bridge

Phase PE ROW CST

Fund STP Local STP

Phase Fund

PE

CMAQ

Phase Fund PE NHS CST NHS
Phase Fund CST STP

Phase Fund CST 1M

Phase Fund CST 1M

Phase Fund CST 1M

Phase Fund CST 1M

Phase Fund

PE

NHS

CST NHS

Year Underway
LOCL Underway
Year Underway
LOCL 2006
Year Underway
LOCL 2005
Year 2007
Year 2007 2007
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year 2007 2007

Federal $0
Federal $0
$103,200 Federal
$0 $273,600 Federal $270,000
Federal $1,600,000 $20,800,000
Federal $162,560
Federal $335,610
Federal $850,320
Federal $12,960,000
Federal $11,700,000
Federal $1,600,000 $30,400,000

State $0
State $0
$25,800 State
$0 $68,400 State
$0
State $400,000 $5,200,000
State $40,640
State $37,290
State $94,480
State $1,440,000
State $1,300,000
State $400,000 $7,600,000

Other $500,000
Other $500,000
$0 Other $500,000
$0 Other
$0
Other $0 $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0 $0

Total $500,000
Total $500,000 $129,000 Total $500,000 $342,000 Total $270,000
Total $2,000,000 $26,000,000
Total $203,200
Total $372,900
Total $944,800
Total $14,400,000
Total $13,000,000
Total $2,000,000 $38,000,000

Page 165 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Fulton

Project: TOO0581 Type Work: Transit Projects

Descp: FY 2005 ACCESS TO JOBS ATLANTA SECTION

3037

Length: 0.00

TIP#:

Project: TOO0582 Type Work: Transit Projects Descp: MARTA FY 2005 SECTION 5307 CAPITAL

Length: 0.00 TIP#: AR-M-5307A
Project: TOO0587 Type Work: Transit Projects Descp: MARTA FY 2005 SECTION 5309 NEW RAIL STARTS

Length: 0.00 TlP#:

Project: TOOO588 Type Work: Transit Projects Descp: MARTA FY 2005 SECTION 5309 FIXED GUIDEWAY

Length: 0.00 TlP#:

Project: TOO0589 Type Work: Transit Projects

Descp: MARTA FY 2005 SECTION 5309 BUS RELATED

PROCUREMENT

Length: 0.00

TIP#:

Project: TOO0590 Type Work: Transit Projects Descp: GRTA FY 2005 SECTION 5309 CAPITAL FOR BUS
PURCHASE Length: 0.00
TlP#:

Project: TOO0597 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR FULTON
COUNTY Length: 0.00
TIP#: AR-FN-5310
Project: TOO0935 Type Work: Transit Projects Descp: MARTA FY 2006 SECTION 5307 CAPITAL

Length: 0.00
TlP#: AR-M-5307A
Project: TOO0936 Type Work: Transit Projects Descp: MARTA FY 2006 SECTION 5309 BUS RELATED
PROCUREMENT Length: 0.00
TlP#:

Project: TOO0937 Type Work: Transit Projects Descp: MARTA FY 2006 SECTION 5309 NEW RAIL STARTS

Length: 0.00 TIP#:
Project: TOO0938 Type Work: Transit Projects Descp: MARTA FY 2006 SECTION 5309 FIXED GUIDEWAY

Length: 0.00 TlP#:

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Federal $750,000

State $0

Other $750,000

Federal $36,865,124

State $0

Other $9,216,281

Federal $208,000

State $52,000

Other

Federal $22,200,000

State $0

Other $5,550,000

Federal $2,400,000

State $0

Other $600,000

Federal $27,200,000

State $6,800,000

Other $0

Federal $199,063

State $49,766

Other $0

Federal $36,838,095

State $0

Other $9,209,524

Federal $2,400,000

State $600,000

Other $0

Federal $1,600,000

State $400,000

Other

Federal $24,000,000

State $0

Other $6,000,000

Total
$1,500,000
Total
$46,081,405
Total Total
$27,750,000 Total $3,000,000 Total
$34,000,000
Total
$248,829
Total
$46,047,619 Total $3,000,000
Total Total
$30,000,000
Page 166 of300



STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM 217/2005

Fulton

Project: TOO0939 Type Work: Transit Projects

Descp: GRTA - FY 2006 SECTION 5309 CAPITAL BUS

PURCHASES

Length: 0.00

TIP#.

Project: TOO0941 Type Work: Transit Projects Descp: FY 2006 ACCESS TO JOBS ATLANTA SECTION
3037 Length: 0.00
TIP#:

Project: TOO0994 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR FULTON.

COUNTY

Length: 0.00

TlP#: AR-FN-5310

Project: T001115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rail - Phase II

Length: 0.00 TlP#:

Project: T001269 Type Work: Transit Projects

Descp: FY 2007 SECTION 5310 CAPITAL FOR FULTON

COUNTY

Length: 0.00

TIP#: AR-FN-5310

Project: T001312 Type Work: Transit Projects Descp: GRTA REGIONAL VAN POOL PROGRAM

Length: 0.00 TIP#:

Project: T001330 Type Work: Transit Projects Descp: MARTA FY 2007 SECTION 5307 CAPITAL

Length: 0.00 TIP#: AR-M-5307A
Project: T001364 Type Work: Rail Projects Descp: COMMUTER RAIL ATLANTA/LOVEJOY
(OPERATIONS ASSISTANCE) Length: 0.00
TlP#: AR-268F

Phase Fund CST Transit

Year 2006

Federal $27,200,000

State $6,800,000

Other $0

Phase Fund CST Transit

Year 2006

Federal $750,000

State $0

Other $0

Phase Fund CST Transit

Year 2006

Federal $209,016

State $52,254

Other $0

Phase Fund CST HPP

Year 2005

Federal $5,702,000

State $1,425,500

Other $0

Phase Fund CST Transit

Year 2007

Federal $219,467

State $54,867

Other $0

Phase Fund CST Transit CST Transit CST Transit
Phase Fund CST Transit

Year 2005 2006 2007
Year 2007

Federal $733,190 $822,938 $919,829
Federal $35,702,928

State $91,649 $102,867 $114,979

Other $91,649 $102,867 $114,979

State $0

Other $8,925,732

Phase Fund CST CMAQ

Year 2006

Federal $5,500,000

State $0

Other $1,375,000

Total $34,000,000
Total $750,000
Total $261,270
Total $7,127,500
Total $274,334
Total $916,487 $1,028,673 $1,149,786 Total $44,628,660
Total $6,875,000

Page 167 of 300

STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 21712005

Gilmer
Project: 0000847 Type Work: Replace Bridge Descp: CR 153/FH 34/ROCK CREEK ROAD @ ROCK
CREEK 9 MI NE OF ELLIJAY Length: 0.21
TlP#:

Project: 0006323 Type Work: Replace Bridge

Descp: CR 101/LOWER CARTECAY ROAD@ CARTECAY

RIVER

Length: 0.40

TlP#:

Project: 0006611 Type Work: Multi-use Trail

Descp: GILMER COUNTY RIVERFRONT PEDESTRIAN

WALKWAY

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006612 Type Work: Streetscapes

Descp: ELLIJAY STREETSCAPE FM SR 282 TO SPRING

STREET - PHASE III

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 831280- Type Work: New Construction

Descp: SR 382 EXT FM CR 239/0LD SR 5 TO NEW APD

CORRIDORISR 5

Lanes: Exist. 0 Prop. 2

Length: 1.52

TlP#:

Project: 831580- Type Wor1<: Replace Bridge Descp: SR 282 BRIDGE REPLACEMENT OVER TAILS
CREEK WEST OF ELLIJAY Length: 0.30
TlP#:

Phase Fund PE Forest Hw ROW Local CST Forest Hw

Year Underway
LOCL 2006

Phase Fund PE Bridge ROW Local CST Bridge

Year 2005 LOCL After 2007

Phase Fund CST STP

Year LUMP

Federal
$0 $1,156,000
Federal $24,000 $0
Federal $221,600

State $0 $0
State $6,000 $0
State $0

Phase Fund CST STP

Year LUMP

Federal $300,000

State $0

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Federal $32,000
Federal $2,248,800

State $8,000
State $562,200

Other $0 $0
Other $0
$50,000
Other $55,400
Other $75,000
Other $0
Other
$0

Total
$0
$1,156,000
Total
$30,000
$50,000
Total $277,000 Total $375,000
Total $40,000 Total
$2,811,000 Page 168 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM WI2005

Glascock
Project: 245345- Type Work: Replace Bridge Descp: SR 102@JOES CREEK 2.2 MI SE OF MITCHELL
Length: 0.58 TlP#:
Project: 245346- Type Work: Replace Bridge Descp: SR 171 @ ROCKY COMFORT CREEK &
OVERFLOW@ GIBSON N CITY LIMIT Length: 0.73 TIP#:

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 2006

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2006

Federal
$64,000 $1,164,000
Federal
$16,000 $2,066,400

State $16,000 $291,000
State
$4,000 $516,600

Other
$0 $0
Other
$0 $0

Total $80,000 $1,455,000
Total $20,000 $2,583,000

Page 169 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zmZQQ5

Glynn

Project: 0000422 Type Work: Widening

Descp: SR 99/GRANTS FERRY ROAD FROM EAST OF 1-95

TO SR 25/US 17 Lanes: Exist. 2 Prop. 4

Length: 1.03

TlP#: BATSOO-15

Project: 0001223 Type Work: Replace Bridge

Descp: CR 78 @ BURNETT CREEK 3 MI NW OF

BRUNSWICK

Length: 0.20

TlP#: BATSOI-06

Project: 0001490 Type Work: Bicycle/Ped. Facility

Descp: DNR REC TRAILS PROG - ALTAMAHA PARK

RECREATIONAL TRAIL

Lenglh: 0.00

LUMP SUM PROJECT

TIP#: BATS-Q94

Project: 0001585 Type Work: Interchange Descp: 1-95 INTERCHANGE RECONSTRUCTION AT SR
99/GRANTS FERRY ROAD Length: 1.00
TlP#: BATS02-01

Project: 0002167 Type Work: Railroad Crossing

Descp: CR 581/0LD JESUP RD IN BRUNSWICK @ NS /I

729221V

Length: 0.40

LUMP SUM PROJECT

TlP#: BATS-Q27A

Project: 0002168 Type Work: Railroad Crossing

Descp: CR 721GREEN SWAMP RD IN BRUNSWICK @ NS /I

729224R

Length: 0.40

LUMP SUM PROJECT

TlP#: BATS-Q27B

Project: 0003803 Type Work: Miscellaneous Improvement Descp: PE FOR SECURITY SYSTEMS ON TALMADGE &
SIDNEY LANIER BRIDGES Length: 35.45

LUMP SUM PROJECT

TlP#: BATS-MSL

Project: 0005071 Type Work: Widening Descp: 1-95 FM NORTH OF SR 303 TO CR 586

Lanes: Exist. 4 Prop. 6

Length: 4.93 TlP#: BATS93-09

Project: 0005088 Type Work: Bridge Rehab Descp: 195 AT TURTLE RIVER AND GIBSON CREEK

Lanes: Exist. 4 Prop. 8

Length: 0.80 TlP#: BATS93-09

Project: 0006018 Type Work: Lighting Descp: SIDNEY LANIER BRIDGE AESTHETIC LIGHTING

Length: 0.00 TlP#: BATS03-05
Project: 0006312 Type Work: Tollway Facility Descp: TORRAS CAUSEWAY TOLL PLAZA REMOVAL

Length: 0.20 TlP#:

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2006

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2006

Phase Fund CST Rec Trails

Year LUMP

Phase Fund ROW NHS CST NHS

Year 2006 2007

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

NHS

Year LUMP

Phase Fund PE NHS CST Bond

Year 2005 2006

Phase Fund CST Bond

Year 2006

Phase Fund CST State

Year 2005

Phase Fund CST Other

Year 2005

Federal
$0 $1,856,000
Federal
$0 $417,600
Federal $100,000

State $0
$464,000
State $0
$104,400
State $0

Federal $3,600,000 $5,428,800

State $900,000 $1,357,200

Federal $100,000

State $0

Federal $100,000

State $0

Federal $48,000

State $12,000

Federal $400,000
$0

State $100,000 $26:000,000

Federal $0

State $29,000,000

Federal $0

State $400,000

Federal $0

State $105,000

Other $0 $0
Other $10,000
$0 Other $25,000
Other $0 $0
Other $0
Other $0
Other $0
Other $0 $0
Other $0
Other $0
Other $0

Total
$0
$2,320,000
Total $10,000 $522,000 Total
$125,000
Total $4,500,000
$6,786,000
Total
$100,000 Total
$100,000
Total
$60,000
Total
$500,000
$26,000,000
Total
$29,000,000 Total
$400,000 Total
$105,000 Page 170of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Glynn
Project: 0006536 Type Work: Historic Facilities Descp: ST. SIMON'S LIGHTHOUSE REHABILITATION

LUMP SUM PROJECT

Length: 0.00 TlP#: TE6536

Project: 0006537 Type Work: Multi-use Trail Descp: JEKYLL ISLAND MULTI-USE TRAIL PHASE II

LUMP SUM PROJECT

Length: 0.00 TIP#: TE-6537

Project: 0006655 Type Work: Lighting

Descp: SR 25IUS 17@ JEKYLL ISLAND CAUSEWAY-

LIGHTING

Length: 0.40

LUMP SUM PROJECT

TIP#:

Project: 511090. Type Work: Widening

Descp: 1-95FM US 17/SR 520 SOUTH OF BRUNSWICK TO

NORTH OF SR 303 Lanes: Exist. 4 Prop. 6

Length: 4.31

TlP#: BATS93-09

Project: 511092. Type Work: Bridge Rehab

Descp: 1-95AT SOUTH BRUNSWICK RIVER AND HILLERY

SLOUGH Lanes: Exist. 4

Prop. 6

Length: 0.59

TlP#: BATS93-09

Project: 511100. Type Work: Widening

Descp: 1-95FM N OF CSX RR TO N OF S ALTAMAHA

RIVER;EXC SR 99 INT Lanes: Exist. 4 Prop. 6

Length: 7.82

TlP#: BATS9310

Project: 522890- Type Work: Intersection Improvement

Descp: ALTAMA AVE\CR 590 AT ALTAMA CONN & SR 303

&SR 25 SPUR

Length: 0.30

TlP#: BATS 04-0J

Project: 523190 Type Work: Bridges

Descp: SR 520/SR 25 FLYOVER BRIDGE AT COLONEL'S

ISLAND @ RR(PORTS}

Length: 0.53

TIP#: BATSOO-OJ

Project: TOO0651 Type Work: Transit Projects

Descp: FY 2005 SECTION 5307 OPERATING FOR

BRUNSWICK

Length: 0.00

TlP#: BATS

Project: TOO0652 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR BRUNSWICK

Length: 0.00 TIP#: BATS
Project: TOO0653 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR BRUNSWICK

Length: 0.00 TIP#: BATS

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST NHS

Year LUMP

Phase Fund

PE

NHS

CST Bond

Year Underway
2005

Phase Fund CST Bond

Year 2005

Phase PE ROW CST

Fund NHS NHS Bond

Year Underway
2006 2007

Phase PE ROW CST

Fund STP Local STP

Year 2005 LOCL After 2007

Phase Fund

PE

NHS

ROW Local

CST H060

CST STP

Phase Fund CST Transit

Year Underway
LOCL 2005 2005
Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Federal $100,000

State $0

Federal $507,200

State $0

Federal $19,200

State $4,800

Federal

State

$0 $14,000,000

Federal $0

State $24,000,000

Federal

State

$7,200 $0

$1,800 $18,316,476

Federal $8,000 $0

State $2,000 $0

Federal
$0 $2,485,250 $4,453,600
Federal $0

State
$0 $0 $1,113,400
State $0

Federal $0

State $0

Federal $25,169

State $6,292

Other $25,000
Other $126,800
Other $19,000
Other $0
Other $0
Other $0 $0
Other $0 $0
Other $0 $0 $0
Other $0
Other $0
Other $0

Total $125,000
Total $634,000
Total $43,000
Total $14,000,000
Total $24,000,000
Total $9,000
$18,316,476 Total $10,000 $0
Total $0
$2,485,250 $5,567,000
Total $0
Total $0
Total $31,461

Page 171 of 300

STA T TRANSPORTA TlON IMPROVEMENT PROGRAM
2aJ2QQ5

Glynn

Project: T000916 Type Work: Transit Projects

Descp: FY 2006 SECTION 5307 OPERATING FOR

BRUNSWICK

Length: 0.00

TIP#: BATS

Project: T000917 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR BRUNSWICK

Length: 000 TIP#: BATS
Project: T000918 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR BRUNSWICK

Length: 0.00
TlP#: BATS
Project: T001232 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 OPERATING FOR
BRUNSWICK Length: 0.00
TlP#:

Project: T001233 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR BRUNSWICK

Length: 0.00 TlP#:
Project: T001234 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR BRUNSWICK

Length: 0.00 TIP#:

Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit
Phase Fund CST Transit

Year 2006
Year 2006
Year 2006
Year 2007
Year 2007
Year 2007

Federal $218,798

State $0

Federal $221,499

State $27,687

Federal $26,427

State $6,607

Federal $218,798

State $0

Federal $221,499

State $27,687

Federal $27,749

State $6,937

Other $295,154
Other $27,687
Other $0
Other $295,154
Other $27,687
Other $0

Total
$513,952
Total
$276,874 Total $33.034
Total
$513,952
Total
$276,874
Total
$34.686
Page 172 of 300

'.

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2t7/2005

Gordon
Project: 0000308 Type Work: Intersection Improvement Descp: SR 156 @ COLLEGE STREET IN CALHOUN

Length: 0.25 TlP#:

Project: 0000683 Type Work: Replace Bridge

Descp: CR 134/COUNTY LINE ROAD@ POLECAT CREEK

@ MURRAY CO. LINE Lanes: Exist. 0 Prop. 1

Length: 0.20

TIP#:

Project: 0001578 Type Work: Turn Lanes Descp: SR 53 MEDIAN TURN LANES FM NORTH OF
FLOYD CO TO SR 53 SPUR Length: 3.83
TlP#:

Project: 0001727 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNAL EQUIP @ VARIOUS

LOC IN GORDON CO

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0003721 Type Work: Railroad Crossing

Descp: CR 93/S0UTH HOLCOMB RD IN ADAIRSVILLE@

CSX #340496X

Length: 0.20

LUMP SUM PROJECT

TlP#:

Project: 0004048 Type Work: Intersection Improvement

Descp: SR 53 AT MCDANIEL STATION ROADICR 5 0.5 MI

WEST OF CALHOUN

Length: 0.52

LUMP SUM PROJECT

TlP#:

Project: 0008416 Type Work: Roadway Project

Descp: SR 53 FM CR 271/CARTER MOUNTAIN RD TO CR

178IDAVIS RD

Length: 2.40

LUMP SUM PROJECT

TlP#:

Project: 810750. Type Work: Interchange

Descp: 1-75 @ SR 156 IN CALHOUN AND WIDENING OF SR

1561 REDBUD RD

Lanes: Exist. 3 Prop. 5

Length: 0.50

TlP#:

Project: 610870 Type Work: Interchange Descp: 1-75 @ UNION GROVE RD/CR 65 RELOC IN
CALHOUN Length: 1.00
TlP#:

Project: 610930. Type Work: Interchange Descp: 1-75 INTERCHANGE @ SR 136 & WIDENING ON SR
136 Length: 1.00
TIP#:

Project: 620780. Type Work: Widening

Descp: SR 3/US 41 FM S OF SR 156 N TO CALHOUN BYP

IN CALHOUN

Lanes: Exist. 2 Prop. 4

Length: 1.65

TIP#:

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL 2006

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2005

Phase Fund

PE

STP

CST STP

Year Underway
2006

Federal $0
$288,000
Federal $0
$306,400
Federal $3,193,600

State $0
$72,000
State $0
$76,600
State $798,400

Phase Fund CST STP

Year LUMP

Federal $600,000

State $150,000

Phase Fund CST STP

Year LUMP

Federal $120,000

State $0

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL LUMP

Federal
$0 $652,500

State
$0 $72,500

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Federal
$315,000 $2,430,000

State
$35,000 $270,000

Phase Fund

PE

1M

ROW 1M

ROW 1M

CST 1M

Phase PE ROW CST

Fund NHS STP STP

Year Underway
2005 After 2007 After 2007
Year Underway
2006 After 2007

Federal $11,743,200
Federal $2,054,400

State
$1,304,800
State
$513,600

Phase PE ROW CST CST

Fund STP STP 1M STP

Phase PE ROW CST

Fund STP STP STP

Year Underway
2006 After 2007 After 2007
Year Underway
2007 After 2007

Federal $602,400

State
$150,600

Federal $4,410,400

State
$1,102,600

Other $0 $0
Other $10,000
$0
Other $0

Total $0
$360,000
Total $10,000
$383,000
Total $3,992,000

Other $0

Total $750,000

Other $0

Total $120,000

Other
$74,000 $0

Total
$74,000 $725,000

Other
$0 $0

Total
$350,000 $2,700,000

Other $0

Total $13,048,000

Other $0

Total $2,568,000

Other $0

Total $753,000

Other $0

Total $5,513,000

Page 173 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM za12QQ5

Gordon

Project: 621365- Type Work: Widening

Descp: SR 3/US 41/CALHOUN FM CR 65/UNION GROVE

RD TO SR 53/1NCL BR Lanes: Exist. 2 Prop. 4

Length: 2.84

TlP#:

Project: 632906- Type Work: Replace Bridge

Descp: SR 225@ COOSAWATTEE RIVER 4 MI NE OF

CALHOUN

Length: 0.32

TIP#:

Project: 642391- Type Work: Replace Bridge

Descp: SR 156 @ OOTHKALOOGA CREEK 1 MI WEST OF

CALHOUN

Length: 0,46

TIP#:

Project: 642395- Type Work: Replace Bridge

Descp: SR 156@ JOHNS CREEK ON FLOYDGORDON CO

LINE

Length: 0.36

TIP#:

Project: MOO2386 Type Work: Bridge Painting
Descp: PROPOSED BRIDGE PAINTING AT SEV LOCS IN BARTOWIDADEIGORDON Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: MOO2540 Type Work: Resurface & Maintenance DeSCP: SR 136 CONN FROM SR 136 TO OOSTANAULA
RIVER BRIDGE Length: 8.87

LUMP SUM PROJECT

TlP#:

Project: M002542 Type Work: Resurface & Maintenance

Descp: SR 136 FROM SR l/WALKER TO SR 136

CONN/GORDON

Length: 19.99

LUMP SUM PROJECT

TIP#:

Project: MOO2789 Type Work: Bridges
Descp: 1-75@ 5 LOCATIONS IN BARTOW & GORDON. DECK REHAB Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2007 After 2007

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2006 After 2007

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway
2005

Phase Fund CST 1M

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund PE 1M CST 1M

Year LUMP LUMP

Federal $800.000
Federal $13,000
Federal $8,000
Federal $1,556,800
Federal $286,560
Federal $499,200
Federal $1,040,000
Federal $180,000 $1,800,000

State $200.000
State $3.250
State $2,000
State $389.200 State
$31,840
State $124,800
State $260,000
State $20.000 $200,000

Other $0
Other $0
Other $0
Other
$0 Other
$0
Other $0
Other $0
Other $0 $0

Total
$1.000.000
Total $16.250 Total $10,000
Total
$1.946.000
Total
$318,400 Total
$624,000
Total
$1,300.000
Total $200,000
$2,000.000
Page 174 of 300



STA TE TRANSPORTA nON IMPROVEMENT PROGRAM 2al2QQ5

Grady
PrOject: 0000535 Type Work: Intersection Improvement Descp: SR 38/US 84@ SR 112 AND 17TH AVENUE

Length: 0.62 TlP#:

Project: 0001035 Type Work: Passing Lanes

Descp: SR 93 FM CAIRO/GRADY CO TO

PELHAM/MITCHELL CO AT 3 LOCATIONS

Lanes: Exist. 2 Prop. 3

Length: 9.05

TIP#:

Project: 0003842 Type Work: Replace Bridge

Descp: CR 85 @ UTILE TIRED CREEK APP .4 MI SE OF

CAIRO

Length: 0.34

TIP#:

Project: 0005293 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS AT VAR LOC ALONG

SR 38IUS 84 & SR 93

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 431800. Type Work: Replace Bridge

Descp: SR 1121PELHAM ROAD @ SAPP CREEK APP 5 MI

NOFCAIRO

Length: 0.40

TlP#:

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year 2006 After 2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year 2007 After 2007 After 2007

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2006

Phase Fund ROW Local CST STP

Year LOCL LUMP

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2007

Federal $32,000

State $8,000

Federal $160,000

State $40,000

Federal
$0 $824.000
Federal $0
$398,400

State
$0 $206,000
State $0
$99,600

Federal

State

$623,305

$155,826

Other $0
Other $0
Other $10,000
$0 Other
$0 $0
Other
$0

Total $40,000
Total $200,000
Total $10,000 $1,030.000 Total
$0 $498,000
Total
$779,131

Page 175 of 300

STA TE TRANSPORTA TION IMPROVEMENT PROGRAM 21712005

Greene

Project: 0004292 Type Work: Intersection Improvement

Descp: SR 12@ CR 110/CUNNINGHAM RD INTERSECTION

IMPROVEMENTS

Length: 0.61

TIP#:

Project: 0006252 Type Work: Widening

Descp: SR 44 FM WEST US 441 BYPASS TO CR

54/L1NGER LONGER RD

Lanes: Exist. 2 Prop. 4

Length: 15.00

TIP#:

Project: 0006253 Type Work: Widening

Descp: SR 44 FM CR 54/L1NGER LONGER ROAD TO EAST

GREENSBORO BYPASS

Lanes: Exist. 2 Prop. 4

Length: 7.94

TlP#:

Project: 0006605 Type Work: Streetscapes Descp: GREENSBORO STREETSCAPE PLAN - PHASE III

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 0006944 Type Work: Realignment

Descp: SR 44 @ CR 39/0LD EATONTON RD N OF 1-20-

INTERSECTION RELOC

Length: 0.15

TlP#:

Project: M002468 Type Work: Shoulder Work Descp: 1-20RAMPS AT SR 77 AND SR 22

LUMP SUM PROJECT

Length: 0.80 TlP#:

Phase Fund

PE

STP

ROW STP

CST STP

Year 2007 After 2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year 2007 After 2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year 2007 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Phase PE ROW CST

Fund STP STP STP

Year 2005 2007 After 2007

Phase Fund CST 1M

Year LUMP

Federal $103.200
Federal $3.692.000
Federal $1,950,400
Federal $600.000
Federal $20,000 $20.000
Federal $1.078.200

State $25,800
State $923.000
State $487,600
State $0
State $5,000 $5,000
State $119.800

Other $0
Other $0
Other $0
Other $150,000
Other $0 $0
Other $0

Total
$129,000
Total
$4.615.000
Total
$2,438,000
Total
$750,000
Total
$25.000
$25,000
Total
$1,198.000
Page 176 of300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005

GWinnett
Project: 0000106 Type Work: Bicycle/Ped. Facility Descp: ROGERS BRIDGE TRAIL IN FULTON & GWINNETT

LUMP SUM PROJECT

Lenglh: 0.00 TlP#: AR-384ABC

Project: 0000109 Type Work: Bicycle/Ped. Facility

Descp: ROGERS BR TRAIUMULTI-USE FAC/ROGERS BR

RD & LANDSCAPING

Length: 0.50

LUMP SUM PROJECT

TIP#: AR-384ABC

Project: 0000300 Type Work: Replace Bridge

Descp: SR 8/US 29 @ ALCOVY RIVER 3 MI NE OF

LAWRENCEVILLE

Length: 0.22

TIP#: GW-295

Project: 0000844 Type Work: Intersection Improvement Descp: SR 8/US 29 AT PLEASANT HILULESTER ROADS

Length: 0.21 TlP#: GW-296
Project: 0000845 Type Work: Intersection Improvement Descp: SR 8IUS 29 AT BEAVER RUIN ROAD/SR 378

Lanes: Exist. 0 Prop. 2

Length: 1.10 TIP#: GW-297

Project: 0002104 Type Work: ATMS/ITS

Descp: SR 124/SCENIC HWY ATMS FM US 78/SR 10 TO US

29/SR 8

Length: 7.30

TIP#: GW-323

Project: 0002328 Type Work: Miscellaneous Improvement Descp: DULUTH TOWN CENTER SCENIC
BEAUTIFICATION Length: 0.00

LUMP SUM PROJECT

TIP#: AR-384ABC

Project: 0002859 Type Work: Bicycle/Ped. Facility
Descp: DULUTH TOWN GREEN PATHWAYS (LCI PROJECT) Length: 0.00

LUMP SUM PROJECT

TlP#: GW-AR-239

Project: 0002860 Type Work: Bicycle/Ped. Facility Descp: SR 120 REALIGNMENT IN DULUTH (LCI PROJECT)

LUMP SUM PROJECT

Length: 0.00 TIP#: GW-AR-241

Project: 0003184 Type Work: HOV Lanes

Descp: 1-85FROM SR 316 NORTH TO HAMIL TON MILL RD

FOR HOV LANES

Lanes: Exist. 8 Prop. 10

Length: 13.99

TlP#: AR-H-IOO

Project: 0003168 Type Work: HOV Lanes Descp: SR 316 FROM 1-85TO SR 20 FOR HOV LANES

Lanes: Exist. 4 Prop. 6

Length: 5.13 TIP#: AR-H-500

Phase Fund

PE

STP

ROW Local

CST STP

Phase Fund

PE

Local

ROW Local

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund PE STP ROW STP CST STP

Phase Fund PE STP ROW STP CST STP

Phase Fund

PE

Local

CST STP

Phase Fund CST STP

Phase Fund PE Local ROW Local CST STP
Phase Fund PE STP ROW Local CST STP
Phase Fund PE Bond ROW Bond CST Bond
Phase Fund PE NHS ROW NHS CST Bond

Year Underway
LOCL LUMP
Year LOCL LOCL LUMP
Year Underway
2006 2007
Year Underway
2005 2007
Year Underway
2005 2007
Year LOCL 2006
Year LUMP
Year LOCL LOCL LUMP
Year Underway
LOCL LUMP
Year Underway
2007 After 2007
Year Underway
2006 After 2007

Federal
$0 $160,000

State
$0 $0

Federal $0 $0
$326,400

State $0 $0 $0

Federal
$160,000 $920,000

State
$40,000 $230,000

Federal
$1.771,200 $4,409,600

State
$442.800 $1,102,400

Federal
$809,600 $2.642,400

State
$202,400 $660.600

Federal $0
$1.717,152

State $0 $0

Federal $750,000

State $0

Federal $0 $0
$728,000

State $0 $0 $0

Federal
$0 $1,260,000

State
$0 $0

Federal $0

State $3.000.000

Federal $2,400.000

State $600,000

Other $0
$40,000
Other $0 $0
$81,600
Other $0 $0
Other $0 $0
Other $0 $0
Other $125,000 $429,288
Other $187,500
Other $0 $0
$182,000
Other $0
$315,000
Other $0
Other $0

Total $0
$200,000
Total $0 $0
$408,000
Total $200,000 $1,150,000
Total $2,214.000 $5,512,000
Total $1,012.000 $3,303,000
Total $125,000 $2,146,440
Total $937,500
Total $0 $0
$910,000
Total $0
$1.575,000
Total $3.000,000
Total $3,000.000

Page 177 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM WaDD5

Gwinnett

Project: 0003773 Type Work: Barriers
Descp: US 78/STONE MOUNTAIN FREEWY FM SCOTT
BLVD TO EAST PARK PLACE Length: 9.58

LUMP SUM PROJECT

TIP#:

Project: 0004430 Type Work: Widening

Descp: SR 20/CUMMING HWY FM PEACHTREE IND BLVD

TO BURGESS ROAD Lanes: Exist. 2 Prop. 4

Length: 4.60

TIP#: GW-020Al

Project: 0004456 Type Work: New Construction

Descp: MCGINNIS FERRY RD EXT FM L'VILLE-SUWANEE

TO SATELLITE BLVD Lanes: Exist. 0 Prop. 4

Length: 2.67

TlP#: GW-119

Project: 0004457 Type Work: Sidewalks Descp: LILBURN CONNECTING SIDEWALKS FM CHURCH
STREET TO BURNS ROAD Length: 0.00
TlP#: GW-AR-BPI

Project: 0004486 Type Work: New Construction
Descp: MCCLURE BRIDGE/DAVENPORT ROAD EXTENSION (SOUTH) LCI PROJECT Length: 0.00

LUMP SUM PROJECT

TlP#: GW-AR-240

Project: 0004594 Type Work: Water Pollution Mitig. Descp: 3852.5 STREAM CREDITS FOR PI
110530-/NHIM-85-2(146) Length: 0.00

LUMP SUM PROJECT

TlP#: AR-311

Project: 0004644 Type Work: Widening

Descp: SR 20/LOGANVILLE HIGHWAY FM OZORA RD TO

SR81

Lanes: Exist. 2 Prop. 4

Length: 3.64

TIP#: GW-020FI&

Project: 0004869 Type Work: HOV Lanes

Descp: SR 316 FROM SR 20 TO DROWNING CREEK ROAD

FOR HOV LANES Lanes: Exist. 4 Prop. 6

Length: 8.04

TlP#: AR-H-501

Project: 0005688 Type Work: ATMSIITS Descp: SR 378 BEAVER RUIN RD ATMS/ITS FROM
SR13/US 23 TO SR8/US 29 Length: 6.45
TlP#: GW-324

Project: 0005689 Type Work: ATMSIITS Descp: LAWRENCEVILLE SWANEE RD ATMS FM
PCHTREE IND BLVD TO SR 120 Length: 8.01
TlP#: GW-325

Project: 0005825 Type Work: ATMSIITS Descp: OLD NORCROSS RD ATMS & SUR FROM
SATELLITE BLVD TO SR 120 Length: 7.00
TlP#: GW-322

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $1,350,000

State $150,000

Other $0

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year Underway
2006 After 2007

Federal $0

State $5,000,000

Other $0

Phase Fund

PE

Local

ROW Local

CST STP

Phase Fund

PE

Local

CST CMAQ

Year LOCL LOCL 2006
Year LOCL 2005

Federal $0 $0
$14,400.000

State $0 $0
$3.600.000

Other $1,800,000 $5,000,000
$0

Federal $0
$400,000

State $0 $0

Other $0
$100,000

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund ROW STP

Year LUMP

Federal
$44,900 $264,000
Federal $124,000

State
$0 $0
State $31.000

Other
$8,823 $70,579
Other $0

Phase Fund

PE

Bond

ROW STP

ROW Bond

CST STP

CST Bond

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year Underway
2005 2005 2006 2006 Year 2007 After 2007 After 2007

Federal
$212,000 $0
$560,000 $0
Federal $7.348,000

State
$53.000 $1.750,000
$140,000 $4,550,000
State $1,837.000

Other
$0 $0 $0 $0 Other $0

Phase Fund

PE

Local

CST STP

Year LOCL 2007

Federal $0
$1,136,800

State $0 $0

Other $105,000 $284,200

Phase Fund

PE

Local

CST STP

Year LOCL 2006

Federal $0
$1,328,400

State $0 $0

Other $105,000 $332.100

Phase Fund CST STP

Year 2007

Federal $1,112,992

State $0

Other $278,248

Total
$1.500,000
Total
$5,000,000
Total
$1,800,000
$5,000.000
$18,000,000
Total
$0
$500,000
Total
$53.723
$334,579
Total
$155,000
Total
$265,000 $1,750,000
$700.000
$4.550,000 Total
$9,185,000
Total $105,000 $1,421,000 Total
$105.000
$1,660,500
Total
$1,391,240 Page 178of300

.'

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 20/2005

GWinnett

Project: 0006276 Type Work: New Construction

Descp: MCCLURE BRIDGE/DAVENPORT ROAD

EXTENSION (NORTH) LCI PROJECT

Lanes: Exist. 0 Prop. 2

Length: 0.20

LUMP SUM PROJECT

TlP#: GW-AR-242

Project: 0006277 Type Work: Sidewalks

Descp: PEDESTRIAN IMPROVEMENTS ALONG MAIN ST

TO BUFORD HWY - LCI

Length: 0.00

LUMP SUM PROJECT

TlP#: GW-AR-243

Project: 0006306 Type Work: Widening

Descp: SR 316 FROM SR 20 EAST TO BARROW CO L1NE-

ADVANCE RW ONLY Lanes: Exist. 4 Prop. 6

Length: 9.20

TlP#: GW-AR-249

Project: 0006336 Type Work: ATMS/ITS

Descp: ATMS/I-985 COMMUNIC/SURVEILANCE FM 1-85 TO

FLOWERY BRANCH

Length: 11.65

TlP#: AR-436

Project: 0006397 Type Work: ATMS/ITS Descp: ATMS/I-85 N RAMP METERS-HAR FM BUFORD
HWY TO PLEASANT HILL Length: 16.43
TIP#: AR-439

Project: 0006587 Type Work: Streetscapes Descp: NORCROSS DOWNTOWN STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 0006588 Type Work: Multi-use Trail Descp: IVY CREEK GREENWAY - PHASE I

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006813 Type Work: Streetscapes Descp: CITY OF DACULA STREETSCAPE PROJECT

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 0008845 Type Work: Multi-use Trail Descp: CAMP CREEK GREENWAY & TRAIL

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0008698 Type Work: Sidewalks Descp: JIMMY CARTER BLVD - PEDESTRIAN SAFETY

Length: 0.00 TIP#:

Project: 0006823 Type Work: ATMS/ITS

Descp: PLEASANT HILL RD FM STEVE REYNOLDS BLVD

TO FULTON CO LINE

Length: 4.04

TlP#: GW-326

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $48,000
$264,000
Federal $840,000

State $0 $0
State $0

Phase Fund ROW NHS

Year 2005

Federal $4,800,000

State $1,200,000

Phase Fund

PE

NHS

CST Bond

Year 2006 2007

Phase Fund

PE

NHS

CST Bond

Year 2005 2006

Phase Fund CST STP

Year LUMP

Federal $120,000
$0

State $30,000 $13,000,000

Federal $40,000 $0

State $10,000 $3,000,000

Federal $800,000

State $0

Phase Fund CST STP

Year LUMP

Federal $1,000,000

State $0

Phase Fund CST STP

Year LUMP

Federal $249,600

State $0

Phase Fund CST STP

Year LUMP

Federal $600,000

State $0

Phase Fund CST H170

Year 2005

Federal $400.000

State $0

Phase Fund

PE

Local

CST STP

Year LOCL 2007

Federal $0
$952,000

State $0 $0

Other $12,000 $66,000 Other $210,000
Other $0
Other $0 $0
Other $0 $0
Other $200,000
Other $250,000
Other $62,400
Other $150,000
Other $0
Other $63,000 $238,000

Total $60,000
$330,000 Total $1,050,000
Total $6,000,000
Total $150,000 $13,000,000
Total $50,000 $3,000,000
Total $1,000,000
Total $1,250,000
Total $312,000
Total $750,000
Total $400,000
Total $63,000 $1,190,000

Page 179 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zaL2005

Gwinnett

Project: 0006831 Type Work: ATMSIITS

Descp: GWINNETT COUNTY TRAFFIC SIGNAL UPGRADES

- SECTION ONE

Length: 0.00

TlPI/. GW-306A

Project: 0006832 Type Work: ATMS/ITS

Descp: GWINNETT COUNTY TRAFFIC SIGNAL UPGRADES

- SECTION TWO

Length: 0.00

TIP#: GW-306B

Project: 0006836 Type Work: Multi-use Trail Descp: PEACHTREE INDUSTRIAL BLVD MULTI-USE PATH

Length: 0.00 TlP#: GW-AR-BPI

Project: 0006838 Type Work: Bicycle/Ped. Facility Descp: DULUTH RESIDENTIAL
LOOP@IRVINDALEIHOWELL MEADIHOWELL Length: 0.00
TlP#: GW-AR-BPI

Project: 0006839 Type Work: BicyclelPed. Facility Descp: SR 1201WLAWRENCEVILLE FM BUFORD HWY TO
DULUTH ELEM & MIDDLE Length: 0.22
TlP#: GW-AR-BPI

Project: 110610- Type Work: Widening

Descp: 1-85FM HAMIL TON RD TO N/SR 211/FARM

MARKET RD IN BARROW

Lanes: Exist. 4 Prop. 6

Length: 6.30

TlP#: GW-AR-192

Project: 110720- Type Work: ATMS/ITS

Descp: ATMS/I-85 N COMMUNIC/SURVEILANCE FROM SR

316 TO SR 20

Lenglh: 9.22

TlP#: AR-470

Project: 121710- Type Work: Widening

Descp: SR 201L0GANVILLE HWY FM PLANTATION BLVD

TO OZORA RD

Lanes: Exist. 2 Prop. 4

Length: 3.90

TlP#: GW-020E

Project: 122925- Type Work: ATMS/ITS Descp: ATMS/SR 316 COMM/SURVEILLANCE FM 1-85TO
SR 124/SR 20 Length: 7.14
TlP#: AR-434

Project: 132890- Type Work: Bridges Descp: CR 1880/PLEASANT HILL RD @ BUFORD HWY &
NS RR/GRD SEP PHl Length: 0.60
TlP#: GW-279A&B

Project: 132985- Type Work: Replace Bridge

Descp: SR 20/CUMMING HWY@ CHATTAHOOCHEE

RIVER @ FORSYTH CO LINE

Lanes: Exist. 2 Prop. 4

Length: 0.40

TIP#: GW-020A2

Phase Fund CST CMAQ

Year 2006

Federal $273,600

State $0

Phase Fund CST CMAQ

Year 2007

Federal $252,000

State $0

Phase Fund

PE

Local

CST STP

Year LOCL 2007

Federal $0
$1,540,000

State $0 $0

Phase Fund CST CMAQ

Year 2007

Federal $1.184.000

State $0

Phase Fund CST CMAQ

Year 2007

Federal $496,000

State $0

Phase Fund PE NHS ROW NHS CST Bond

Year Underway
2006 After 2007

Federal $4.116.000

State $1.029.000

Phase Fund

PE

NHS

CST NHS

Year 2005 2006

Federal $120.000 $12.372,000

State $30.000 $3.093.000

Phase Fund PE STP ROW Bond ROW State CST Bond
Phase Fund PE NHS CST NHS

Year Underway Underway Underway
2006
Year 2006 2007

Federal

State

$0
Federal $120,000 $9.120.000

$7.900.000
State $30.000 $2.280.000

Phase Fund PE STP ROW STP CST STP CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Year Underway Underway
2005 2005
Year Underway
2006 After 2007 After 2007

Federal

State

$8,000,000 $8.000.000
Federal
$412,000

$2,000.000 $2.000.000
State
$103.000

Other $68,400
Other $63.000
Other $192.500 $385,000
Other $296,000
Other $124.000
Other $0
Other $0 $0
Other
$0 Other
$0 $0
Other
$0 $0 Other $0

Total $342,000
Total $315,000
Total $192.500 $1.925.000
Total $1.480.000
Total $620.000
Total $5.145.000
Total $150.000 $15,465.000
Total
$7.900.000 Total $150.000
$11,400,000
Total
$10.000.000 $10.000,000
Total $515.000
Page 180 of 300





STATE TRANSPORTA TION IMPROVEMENT PROGRAM W/2QQ5

Gwinnett

Project: 132986. Type Work: Replace Bridge

Descp: SR 120/DULUTH HIGHWAY@ SINGLETON CREEK

1.5 MI E OF DULUTH

Length: 0.38

TlP#: GW-290A&B

Project: 142285. Type Work: Replace Bridge

Descp: SR 324/GRAVEL SPRING RD @ 1-85 4.5 MI SE OF

BUFORD Lanes: Exist. 2

Prop. 4

Length: 0.25

TlP#: GW-289

Project: 150310. Type Work: Replace Bridge

Descp: CR 1958ITRICKUM ROAD@ YELLOW RIVER 4.5 MI

SW LAWRENCEVILLE Lanes: EXist. 2 Prop. 4

Length: 0.22

TlP#: GW-273

Project: 162526- Type Work: Sidewalks Descp: MILLER RD FM COLE DR TO HAMBRICK DR

Length: 0.83 TIP#: GW-AR-BPO

Project: 171630. Type Work: Park & Ride Lot Descp: SNELLVILLE AREA PARK & RIDEITRANSFER
CTR:NEAR US 78 @SR 124 Length: 0.40
TIP#: GW-AR-228

Project: 721000- Type Work: Widening

Descp: SR 120 FM STATE BRIDGE RD TO PEACHTREE

IND BLVD/GWINNEIT Lanes: Exist. 2 Prop. 4

Length: 6.54

TIP#: FN-003A

Project: 721940- Type Work: ATMSIITS Descp: ATMSI SR 410 COMM/SURVEIL FM
LAWRENCEV'LE HWY TO E PARK PL Length: 8.22
TlP#: AR-471

Project: 742920- Type Work: Bridge Rehab

Descp: CR 1319/MCGINNIS FERRY RD @

CHAITAHOOCHEE RVR/FORSYTH/GWINET

Lanes: Exist. 2 Prop. 4

Length: 0.60

TlP#: FN-233C

Project: 770315 Type Work: Rail Projects

Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)

PHASE 1

Length: 0.00

TIP#: AR-269A

Project: 770316 Type Work: Rail Projects

Descp: COMMUTER RAIL ATLANTA TO DACULA (ATHENS)

PHASE 2

Length: 0.00

TlP#: AR-269B

Project: M002825 Type Work: Concrete Rehab Descp: SR 316 FM SR 120 TO SR 8/US 29

LUMP SUM PROJECT

Length: 5.55 TlP#:

Phase Fund

PE

Bridge

ROW Bridge

CST STP

Year Underway
2005 2006

Federal
$326,400 $1,238,400

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
2007 After 2007 After 2007
Year 2005 LOCL After 2007

Federal $412,000
Federal $24,000 $0

Phase Fund ROW CMAQ CST CMAQ

Year 2005 2006

Federal $0
$302,400

State $81,600 $309,600
State $103,000
State $6,000 $0
State $0 $0

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2006

Phase Fund PE STP ROW STP CST STP

Year 2007 After 2007 After 2007

Phase Fund PE NHS CST Bond

Year 2006 2007

Federal
$0 $1,790,400
Federal $1,584,800

State
$0 $0
State $396,200

Federal $120,000
$0

State $30,000 $11,970,000

Phase Fund PE STP CST STP

Year 2005 2007

Federal $160,000 $1,600,000

State $40,000 $400,000

Phase Fund

PE

STP

PE

HPP

CST HPP

Year Underway Underway
2005

Federal

State

$592,000

$148,000

Phase Fund CST HPP

Year 2005

Federal $40,000,000

State $10,000,000

Phase Fund CST 1M

Year LUMP

Federal $9,000,000

State $1.000,000

Other $0 $0
Other $0
Other $0 $0
Other $100,000
$75,600
Other $100,000 $447,600
Other $0
Other $0 $0
Other $0 $0
Other
$0 Other
$0
Other $0

Total $408,000 $1.548,000
Total $515,000
Total $30,000
$0
Total $100,000 $378,000
Total $100,000 $2,238,000
Total $1,981,000
Total $150,000 $11,970,000
Total $200,000 $2,000,000
Total
$740,000
Total $50,000,000
Total $10,000,000

Page 181 of 300

STATE TRANSPORTA nON IMPROVEMENT PROGRAM za12QQ5

Gwinnett

Project: T000584 Type Work: Transit Projects

Descp: FY 2005 SECTION 5307 CAPITAL FOR GWINNETT

COUNTY

Length: 0.00

TlP#: AR.GW5307

Project: T000598 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR GWINNETT

COUNTY

Length: 0.00

TIP#: AR-GW.5310

Project: T000931 Type Work: Transit Projects

Descp: FY 2006 SECTION 5307 CAPITAL FOR GWINNETT

COUNTY

Length: 0.00

TlP#: ARGW5307

Project: T000995 Type Work: Transit Projects
Descp: FY 2006 SECTION 5310 CAPITAL FOR GWINNETT COUNTY Length: 0.00

TlP#: ARGW5310

Project: T001115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rail Phase 11

Length: 0.00 TlP#:

Project: T001275 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR GWINNETT
COUNTY Length: 0.00
TlP#: AR-GW-5310
Project: T001329 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR GWINNETT
COUNTY Length: 0.00
TIP#: AR-GW.5307

Phase Fund
CST Transit

Year 2005

Phase Fund
CST Transit

Year 2005

Phase Fund
CST Transit

Year 2006

Phase Fund
CST Transit

Year 2006

Phase Fund
CST HPP

Year 2005

Phase Fund
CST Transit

Year 2007

Phase Fund
CST Transit

Year 2007

Federal $5,256,574

State $0

Other $1,314,143

Federal $64,066

State $16,017

Other $0

Federal $5,377,454

State $0

Other $1,344,363

Federal $67,270

State $16,817

Other $0

Federal $5,702,000

State $1,425,500

Other $0

Federal $70,633

State $17,658

Other $0

Federal $5,067,982

State $0

Other $1,266,996

Total
$6,570.717
Tolal
$80,083
Total
$6.721,817
Tolal
$84,087
Total
$7,127.500 Tolal
$86.291
Tolal
$6,334.978
Page 182 of 300

..e''.

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005

Habersham

Project: 0000139 Type Work: Bicycle/Ped. Facility

Descp: TALLULAH GORGE MULTIUSE TRAIL & BRIDGE

PHASE 3

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0000317 Type Work: Interchange

Descp: SR 365 @ LEVEL GROVE RD/IMP RAMPS/ADD

SIGNALS

Lanes: Exist. 0 Prop. 4

Length: 0.25

TlP#:

Project: 0000318 Type Work: Widening

Descp: SR 15CO FROM SR 365 TO US 441 UPGRADE TO 4

LANES

Lanes: Exist. 3 Prop. 4

Length: 0.50

TlP#:

Project: 0008447 Type Work: Intersection Improvement Descp: SR 385/US 441 @ PIEDMONT COLLEGE-
PEDESTRIAN BRIDGE Length: 0.40

LUMP SUM PROJECT

TlP#:

Project: 0006450 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN HABERSHAM/STEPHENS Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 132100. Type Work: Widening

Descp: SR 105/US 441 BUS FM CANNON BRIDGE RD TO

WALNUT ST/CORNELIA Lanes: Exist. 2 Prop. 6

Length: 2.74

TlP#:

Project: 171380. Type Work: Minor Widen & Resurf

Descp: CR 240/CR 81/LOW GAP RD FM CR 245INEW

LIBERTY TO RABUN CO.

Lanes: Exist. 1 Prop. 2

Length: 2.36

TlP#:

Phase Fund

PE

Local

ROW STP

CST STP

Year LOCL Underway LUMP

Phase Fund

PE

NHS

CST NHS

Year 2006 After 2007

Federal $0
$577,000
Federal $56,000

Phase Fund

PE

STP

CST STP

Year 2007 After 2007

Federal $107,200

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $0
$317,520
Federal $504,000

Phase PE ROW CST

Fund STP STP STP

Year Underway
2007 After 2007

Phase PE ROW CST

Fund Forest Hw Local Forest Hw

Year Underway
LOCL 2005

Federal $3,600,000
Federal $0
$2,239,000

State $0 $0
State $14,000
State $26,800
State $0
$35,280 State $126,000
State $900,000
State $0 $0

Other $0
$144,000 Other $0
Other $0
Other $0
$88,200 Other
$0
Other $0
Other $0 $0

Total $0
$721,000 Total
$70,000
Total $134,000
Total $0
$441,000 Total $630,000
Total $4,500,000
Total $0
$2,239,000

Page 183 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 27/2005

Hall
Project: 0006309 Type Work: Intersection Improvement Descp: SR 13/ATLANTA HIGHWAY AT HILTON DRIVE

Lanes: Exist. 2 Prop. 3 LUMP SUM PROJECT

Lenglh: 0.40 TlP#:

Project: 0006336 Type Work: ATMSIITS

Descp: ATMSII-985 COMMUNIC/SURVEILANCE FM 1-85TO

FLOWERY BRANCH

Length: 11,65

TIP#: AR-436

Project: 0006448 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ 7 LOC ALONG SR

131N HALL COUNTY

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006614 Type Work: Streetscapes

Descp: FLOWERY BRANCH HISTORIC DISTRICT

STREETS CAPE

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006615 Type Work: Multi-use Trail Descp: ROCK CREEK GREENWAY - PHASE"

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 110400. Type Work: Interchange

Descp: 1-985SPLIT DIAMOND INTERCHANGE @ SR 13 &

SR 53 & CD SYSTEM

Length: 3.40

TIP#:

Project: 110465. Type Work: Interchange Descp: 1-985 @ SR 11/US 129 NB EXIT LOOP & SB EXIT

Lanes: Exist. 2 Prop. 4

Length: 1.24 TIP#:

Project: 122010- Type Work: Widening

Descp: SR 369/BROWN'S BR RD FM FORSYTH CO LINE

TO SR 53

Lanes: Exist. 2 Prop. 4

Length: 4.93

TlP#:

Project: 122150- Type Work: Widening

Descp: SR 11/US 129 FM SR 332@ TALMO/JACKSON CO

TO SR 323/HALL CO

Lanes: Exist. 2 Prop. 4

Length: 6.73

TlP#:

Project: 122240. Type Work: Widening

Descp: SR 11IUS 129 FM SR 284/CLERMONT TO

CLEVELAND BYPIWHITE CO

Lanes: Exist. 2 Prop. 4

Length: 24.00

TIP#:

Project: 132250. Type Work: Passing Lanes

Descp: SR 52 FM 1 MILE NORTH OF SR 365 TO SOUTH OF

JULIAN WILEY RD

Lanes: Exist. 2 Prop. 3

Length: 2.50

TlP#:

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL LUMP

Phase Fund PE NHS CST Bond

Year 2006 2007

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

NHS

ROW NHS

CST Bond

Year Underway Underway
2006

Phase Fund

PE NHS

ROW 34A

ROW NHS

ROW STP

CST NHS

Phase Fund

PE

STP

ROW STP

ROW STP

CST STP

Phase Fund

PE

NHS

ROW NHS

ROW NHS

CST NHS

Phase Fund PE STP ROW STP CST STP

Year Underway Underway
2007 Underway After 2007
Year Underway
2007 After 2007 After 2007
Year Underway Underway
2005 After 2007
Year Underway
2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
2006 After 2007

Federal
$0 $315,000

State
$0 $35,000

Federal $120,000
$0

State $30,000 $13,000,000

Federal $392,000

State $98,000

Federal $321,600

State $0

Federal $500,000

State $0

Federal

State

$0 $44,401,000

Federal

State

$1,316,800

$329,200

Federal $4,312,000

State $1,078,000

Federal

State

$4,627,200 $1,156,800

Federal $2,741,600

State $685,400

Federal $3,200,000

State $800,000

Other $0 $0
Other $0 $0
Other $0
Other $80,400
Other $125,000
Other
$0 Other
$0 Other
$0
Other
$0 Other
$0
Other $0

Total $0
$350,000 Total $150,000 $13,000,000
Total $490,000
Total $402,000
Total $625,000
Total $44,401,000
Total $1,646,000
Total $5,390,000
Total $5,784,000
Total $3,427,000
Total $4,000,000
Page 184 of 300



..''

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
zaJ2QQ5

Hall
Project: 132995- Type Work: Replace Bridge Descp: SR 52 @ CANDLER CREEK 5.4 MI SOUTH OF LULA

Length: 0.22 TIP#:

Project: 142290. Type Work: Replace Bridge

Descp: SR 52@ CHATTAHOOCHEE RIVER 3 MI NW OF

LULA

Length: 0.27

TIP#:

Project: 142291. Type Work: Replace Bridge

Descp: SR 284 @CHATTAHOOCHEE RVRlLAKE LANIER 4

MI N OF GAINESVILLE

Length: 0.55

TlP#:

Project: 142292- Type Work: Replace Bridge

Descp: SR 323 @ NORTH OCONEE RIVER & OVERFLOW

7.5 MI SOUTH OF LULA

Length: 0.42

TlP#:

Project: 142294. Type Work: Replace Bridge Descp: SR 332 @ WALNUT CREEK 1.7 MI SW OF
CANDLER Length: 0.23
TlP#:

Project: 162430. Type Work: Widening

Descp: SR 347/FRIENDSHIP & THOMPSON MILL RD FM

1-985TO SR 211

Lanes: Exist. 2 Prop. 6

Length: 8.40

TlP#:

Project: TOO0674 Type Work: Transit Projects Descp: FY 2005 ACCESS TO JOBS FOR GAINESVILLE
Length: 0.00 TIP#:
Project: TOO0944 Type Work: Transit Projects Descp: FY 2006 ACCESS TO JOBS FOR GAINESVILLE
Length: 0.00 TIP#:
Project: T001253 Type Work: Transit Projects Descp: FY 2007 ACCESS TO JOBS FOR GAINESVILLE
Length: 0.00 TlP#:
Project: T001254 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 OPERATING ASSISTANCE
FOR GAINESVILLE Length: 0.00 TIP#:
Project: T001256 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 OPERATING ASSISTANCE
FOR GAINESVILLE Length: 0.00 TIP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 After 2007

Federal $12,000

State $3,000

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 After 2007 After 2007
Year Underway
2006 After 2007

Federat $800,000

State $200,000

Federal $383,200

State $95,800

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway After 2007

Federat

State

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 After 2007

Federal $12,000

State $3,000

Phase Fund

PE

STP

ROW STP

ROW STP

ROW STP

CST STP

Phase Fund

CST Transit

Year Underway Underway Underway
2005 After 2007
Year 2005

Federal

State

$5,482,400
Federal $320,000

$1,370,600
State $80,000

Phase Fund CST Transit

Year 2006

Federal $320,000

State $80.000

Phase Fund CST Transit

Year 2007

Federal $320,000

State $80,000

Phase Fund CST Transit

Year 2005

Federal $100,990

State $0

Phase Fund CST Transit

Year 2006

Federal $100,990

State $0

Other $0
Other $0
Other $0
Other
Other $0
Other
$0 Other
$0
Other $0
Other $0
Other $100,990
Other $100,990

Total $15,000
Total $1,000,000
Total $479,000
Total
Total $15,000
Total
$6,853,000 Total $400,000
Total $400,000
Total $400,000
Total $201,979
Total $201,979

Page 185 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Hall

Project: T001257 Type Work: Transit Projects

Descp: FY 2007 SECTION 5307 OPERATING ASSISTANCE

FOR GAINESVILLE

Length: 0.00

TIP#:

Project: T001258 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR
GAINESVILLE Length: 0.00
TIP#:

Project: T001259 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR
GAINESVILLE Length: 0.00
TlP#:

Project: T001260 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR
GAINESVILLE Length: 0.00
TIP#:

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2007

Federal $100,990

State $0

Federal $679,840

State $84,980

Federal $679,840

State $84,980

Federal $679,840

State $84,980

Other $100,990
Other $84,980
Other $84,980
Other $84,980

Total
$201,979
Total
$849,800
Total
$849,800
Total
$849,800
Page186of300

.:

''e......,''''

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM Wl2QQ5

Hancock
Project: 231270- Type Work: Replace Bridge Descp: SR 16 OVER THE OCONEE RIVER @ HANCOCK
COUNTY LINE Length: 1.00
TlP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Federal

State

$4,156,800 $1,039,200

Other $0

Total $5,196.000

Page 187 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Haralson

Project: 621580. Type Work: Passing Lanes

Descp: SR 120 FM W OF BUCHANAN BYP TO LAKE

OLYMPIA Lanes: Exist. 2 Prop. 4

Length: 1.20

TlP#:

Project: 63117 5- Type Work: Intersection Improvement Descp: SR 8 WIDEN;INTERSECT.IMP;BIKE-PED FM
FLORIDA AVE TO BRYAN ST Length: 0.25
TlP#:

Project: 632915. Type Work: Replace Bridge Descp: SR 120@ LITTLE RIVER IN EAST BUCHANAN

Length: 0.23 TlP#:

Project: 842350- Type Work: New Construction Descp: STOUFFEL RD FM SR 100 TO SR 8; GOLF COURSE
TO SR 8 NEW LOC Length: 0.90
TlP#:

Project: 642380- Type Work: Replace Bridge Descp: SR 100 AT WALKER CREEK 3 MI S OF
TALLAPOOSA Length: 0.22
TIP#:

Project: 671200- Type Work: Sidewalks Descp: STREETSCAPES & SIDEWALKS IN THE CITY OF
BREMEN Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: M002966 Type Work: Guardrail Descp: 1-20FROM ALABAMA STATE LINE TO SR 1/US 27

LUMP SUM PROJECT

Length: 24.00 TlP#:

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2005

Phase Fund ROW STP CST STP

Year 2006 2007

Federal
$1,462,400
Federal $170,400 $1,064,000

State
$365,600
State $42,600 $266,000

Phase Fund

PE

Bridge

CST Bridge

Year Underway
2005

Federal $806,400

State $201,600

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2005

Federal $11,757,600

State $2,939,400

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 2007

Federal
$12,000 $1,008,800

State
$3,000 $252,200

Phase Fund PE Local ROW Local CST STP

Year LOCL LOCL LUMP

Federal $0 $0
$344,800

State $0 $0 $0

Phase Fund PE NHS CST NHS

Year LUMP LUMP

Federal $1,600,000 $26,400,000

State $400,000 $6,600,000

Other
$0
Other $0 $0
Other $0
Other
$0
Other $0 $0
Other $0 $0
$86,200
Other $0 $0

Total
$1,828,000
Total
$213,000
$1,330,000
Total $1,008,000
Total
$14,697,000 Total
$15,000 $1,261,000 Total
$0
$0
$431,000 Total
$2,000.000
$33,000,000
.' Page188of300

.'
'.'I

STATE TRANSPORTATION IMPROVEMENT PROGRAM WI2DDS

Harris

Project: 0002382 Type Work: Landscaping
Descp: LANDSCAPING ON 1-185 IN HARRIS AND TROUP COUNTIES Length: 34.81

LUMP SUM PROJECT

TlP#:

Project: 0003084 Type Work: Replace Bridge

Descp: CR 140IWHITESVILLE ROAD @ STANDING BOY

CREEK TRIB. NORTH

Lanes: Exist. 1 Prop. 2

Length: 0.12

TIP#:

Project: 0003085 Type Work: Replace Bridge

Descp: CR 140IWHITESVILLE ROAD @STANDING BOY

CREEK TRIB. SOUTH

Lanes: Exist. 1 Prop. 2

Length: 0.13

TIP#:

Project: 0003086 Type Work: Replace Bridge

Descp: CR 140IWHITESVILLE ROAD @STANDING BOY

CREEK SO OF SR 315

Lanes: Exist. 1 Prop. 2

Length: 0.08

TlP#:

Project: 0003088 Type Work: Replace Bridge Descp: CR 393/LOWER BLUE SPRINGS @ BARNES
CREEK 2.4 MI SW HAMIL TON Length: 0.19
TIP#:

Project: 0003090 Type Work: Replace Bridge

Descp: CR 219/BROWN CREEK RD @ BROWN CREEK 5

MI NW OF WAVERLY HALL

Lanes: Exist. 1 Prop. 2

Length: 0.14

TIP#:

Project: 0006446 Type Work: Widening

Descp: SR llUS 27 FM TURNBERRY LN/MUSCOGEE TO

GATLIN LN/HARRIS

Lanes: Exist. 2 Prop. 4

Length: 6.26

TIP#: VET 2005

Project: 0006594 Type Work: Landscaping Descp: PINE MOUNTAIN BEAUTIFICATION

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006595 Type Work: Transportation museums
Descp: OLD MOUNTAIN HILL SCHOOLHOUSE MUSEUMPHASE II Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006596 Type Work: Multi-use Trail Descp: VILLAGE GREEN MULTI-MODAL TRAIL - PHASE II

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 331660- Type Work: Replace Bridge Descp: CR 387 @ PALMETTO CREEK 4 MI. SOUTH OF
PINE MOUNTAIN Length: 0.19
TIP#:

Phase Fund CST STP

Year LUMP

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2005

Phase Fund PE 114 ROW Local CST Bridge

Year Underway
LOCL 2005

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2005

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2006

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2005

Phase Fund PE STP ROW STP CST STP

Year 2007 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2006

Federal $449,600

State $112,400

Federal $0
$160,800
Federal $0
$200,800
Federal $0
$271,200
Federal $0
$333,600
Federal $0
$335,200
Federal $4,000

State $0
$40,200
State $0
$50,200
State $0
$67,800
State $0
$83,400
State $0
$83,800
State $1,000

Federal $320,000

State $0

Federal $80,000

State $0

Federal $84,800

State $0

Federal
$0 $441,600

State
$0 $110,400

Other $0
Other $10,000
$0 Other $10,000
$0 Other $10,000
$0 Other $20,000
$0 Other $20,000
$0 Other
$0
Other $80,000
Other $20,000
Other $21,200
Other $20,000
$0

Total $562,000
Total $10,000 $201,000
Total $10,000 $251,000
Total $10,000 $339,000
Total $20,000 $417,000 Total $20,000 $419,000
Total $5,000
Total $400,000
Total $100,000
Total $106,000
Total $20,000 $552,000

Page 189 ot 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM Za12005

Harris
Project: 333155- Type Work: Replace Bridge Descp: SR 1IUS 27@ MOUNTAIN CREEK 1,6 MI N OF SR
190 Lenglh: 0,25
TlP#:

Project: 333156. Type Work: Replace Bridge Descp: SR 103@ FLAT SHOALS CREEK 11,2 MI W OF SR
116 Length: 0,63
TIP#:

Project: 343370- Type Work: Replace Bridge

Descp: SR 116 @ LITTLE PALMETTO CREEK HAMIL TON -

NE SECTION

Lenglh: 0.42

TIP#:

Project: 343371- Type Work: Replace Bridge Descp: SR 116 @ PALMETTO CREEK 1.4 MI E OF SR 1

Length: 0,76 TlP#:

Project: 343372- Type Work: Replace Bridge Descp: SR 116 @ BETHLEHEM CRK AND BETHEL CRK 6
MILES NE OF HAMILTON Length: 0,80
TlP#:

Project: 370850- Type Work: Replace Bridge Descp: CR 20/MONUMENT RD @ HOUSE CREEK ,2 MI NW
OF WHITESVILLE Length: 0,21
TIP#:

Project: MOO0890 Type Work: Miscellaneous Improvement Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN
DISTRICT 3 Length: 0,00

LUMP SUM PROJECT

TlP#:

Project: MOO2440 Type Work: Rest Area
Descp: 1-85WEST POINT WELCOME CENTER RESTROOM RENOVATIONS Length: 0.40

LUMP SUM PROJECT

TlP#:

Project: MOO2782 Type Work: Bridges Descp: 1-85@CHATTAHOOCHEE RIVER - PROPOSED
DECK REHAB Length: 0,20

LUMP SUM PROJECT

TlP#:

Project: MOO2969 Type Work: Guardrail
Descp: 1-185 FM CS 2249/WILLIAMS RD/MUSCOGEE TO SR 1/TROUP Length: 30,32

LUMP SUM PROJECT

TIP#:

Phase Fund PE Bridge ROW Bridge CST Bridge

Phase Fund PE Bridge ROW Bridge CST Bridge

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund PE Bridge ROW Bridge CST Bridge

Phase Fund PE Bridge ROW Local CST Bridge

Phase Fund ROW STP CST STP

Phase Fund

PE

1M

CST 1M

Phase Fund

PE

1M

CST 1M

Phase Fund PE 1M CST 1M

Year Underway Underway
2005
Year Underway
2005 After 2007
Year Underway
2005 2005
Year Underway
2005 2005
Year Underway
2005 2006
Year Underway
LOCL 2006
Year Underway
LUMP
Year Underway
LUMP
Year LUMP LUMP
Year LUMP LUMP

Federal
$763.200
Federal $12.000
Federal $20.000
$880,000
Federal $68.000
$2.267.200
Federal $28.000
$1.522,400
Federal $0
$559.200
Federal $236.000
Federal $450,000
Federal $90.000
$900,000
Federal $1.800.000 $43,200,000

State
$190.800
State $3,000
State $5.000
$220,000
State $17,000 $566.800
State $7.000
$380.600
State $0
$139.800
State $59,000
State $50,000
State $10,000 $100,000
State $200,000 $4,800.000

Other
$0
Other $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $0 $0
Other $0 $0

Total
$954.000 Total $15.000
Total $25.000
$1.100.000 Total $85.000
$2.834.000 Total $35.000
$1.903.000 Total $0 $699.000 Total $295.000
Total $500.000
Total $100,000 $1.000.000
Total $2.000.000 $48.000.000
Page 190 of 300



'."1


STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2012005

Hart

Project: 0003898 Type Work: Landscaping

Descp: LANDSCAPING ON 1-85 IN FRANKLIN AND HART

COUNTIES

Length: 3.25

LUMP SUM PROJECT

TlP#:

Project: 0006421 Type Work: Barriers

Descp: 1-a5CABLE MEDIAN BARRIERS IN HART &

FRANKLIN COUNTY

Length: 23.68

LUMP SUM PROJECT

TIP#:

Project: 0006606 Type Work: Strestscapes Descp: HARTWELL STREETSCAPE PHASE II

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 142275. Type Work: Replace Bridge

Descp: SR 172@ COLDWATER CREEK 8.5 MI E OF

ROYSTON

Length: 0.47

TIP#:

Phase Fund CST STP

Year LUMP

Federal $449.600

State $112,400

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $1,688,400

State $187.600

Phase Fund CST STP

Year LUMP

Federal $500.000

State $0

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 2007

Federal
$16,000 $1.015,200

State
$4,000 $253.800

Other $0
Other $0
Other $125.000
Other $0 $0

Total $562.000
Total $1,876,000
Total $625.000
Total $20,000 $1.269.000

Page 191 of 300

STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 217/2005

Heard

Project: 0006624 Type Work: Streetscapes Descp: FRANKLIN DOWNTOWN MULTI-USE TRAIL
FACILITIES & STREETSCAPE Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 343420.

Type Work: Replace Bridge

Descp: SR 100@ NEW RIVER 2.9 MI W OF CORINTH

Length: 0.25 TlP#:

Project: 343421- Type Work: Replace Bridge Descp: SR 100 @ CLEAR CREEK 4.2 MI W OF CORINTH

Length: 0.22 TlP#:

Phase Fund CST STP

Year LUMP

Federal $224,800

State $0

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2007

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2007

Federal
$11,200 $880,000
Federal
$11,200 $880,000

State $2,800
$220,000
State $2,800
$220,000

Other $56,200

Total $281,000



Other
$0 $0
Other
$0 $0

Total
$14.000 $1,100,000
Total $14,000 $1,100,000

,(.I

Page192of300

..'J

STA TE TRANSPORTATION IMPROVEMENT PROGRAM W/2QQ5

Henry

Project: 0000294 Type Work: Widening

Descp: SR 3IUS 19/41 FM LAPRADE RD/CR 18 TO SR 20 IN

HENRY COUNTY

Lanes: Exist. 4 Prop. 6

Length: 8.55

TfP#: HE-166

Project: 0000298 Type Work: Intersection Improvement Descp: SR 155 AT KELLYTOWN ROAD/CR 107

Length: 0.25 TIP#: HE-160

Project: 0000528 Type Work: Lighting

Descp: 1-75@ BILL GARDNER PARKWAY INTERCHANGE-

LIGHTING

Length: 0.40

LUMP SUM PROJECT

TIP#: LUMP

Project: 0000561 Type Work: New Construction

Descp: GRTACAMPGROUND RD EXT FM JODECO RD TO

SR 42 @CAMPGROUND RD

Lanes: Exist. 0 Prop. 2

Length: 1.50

TfP#: HE-IIO

Project: 0000562 Type Work: Minor Widen & Resurf Descp: HAMPTON-LOCUST GROVE RD FM STRICKLAND
RD TO 1-75: PH 1 -GRTA Length: 5.08
TfP#: HE-126BI&

Project: 0000883 Type Work: Intersection Improvement Descp: SR 138 AT FLAT ROCK ROAD/CR 100

LUMP SUM PROJECT

Length: 0.47 TfP#: AR-157

Project: 0001055 Type Work: Intersection Improvement Descp: SR 155 AT RACE TRACK ROADICR 376

LUMP SUM PROJECT

Length: 0.42 TIP#: AR-118

Project: 0001096 Type Work: New Construction

Descp: MCDONOUGH PARKWAY EXT FM JONESBORO RD

TO SR 421US 23 PHASE 1

Lanes: Exist. 0 Prop. 2

Length: 1.20

TfP#: HE-118B

Project: 0002638 Type Work: Widening

Descp: EAGLE'S LANDING PARKWAY/CR 659 FROM SR 42

TO JODECO ROAD Lanes: Exist. 2 Prop. 4

Length: 3.66

TIP#: HE-132BI&

Project: 0002857 Type Work: Bicycle/Ped. Facility
Descp: OLD ATLANTA RD/EAST ATLANTA RD/REEVES CREEK TRAIL (LCI PROJ) Length: 0.00

LUMP SUM PROJECT

TfP#: HE-AR-227

Project: 0002858 Type Work: Bicycle/Ped. Facility

Descp: SOUTH LEE STREET FM US 23 TO ROCK QUARRY

RD (LCI PROJ)

Length: 0.44

LUMP SUM PROJECT

TIP#: HE AR 228

Phase PE ROW CST

Fund NHS NHS NHS

Year 2007 After 2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2006

Phase Fund CST NHS

Year LUMP

Phase PE ROW CST

Fund Local Local Bond

Year LOCL LOCL 2006

Phase PE ROW CST

Fund Local Local Bond

Year LOCL LOCL 2006

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
LUMP

Phase Fund

PE

Local

ROW Local

CST Bond

Year LOCL LOCL 2005

Phase PE ROW CST

Fund Local Local Bond

Year LOCL LOCL 2006

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL LUMP

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL LUMP

Federal $688,000

State $172,000

Other $0

Federal
$180,000 $516,000
Federal $167,200

State
$45,000 $129,000
State $41,800

Other
$0 $0
Other $0

Federal $0 $0 $0

State $0 $0
$2,600,000

Other $250,000 $700,000
$0

Federal $0 $0 $0

State $0 $0
$2,000,000

Other $1,000,000 $1,500,000 $8,000,000

Federal
$0 $1,260,000

State
$0 $140,000

Other
$452,900 $0

Federal

State

Other

$551,700

$61,300

$0

Federal $0 $0 $0

State $0 $0
$1,800,000

Other $300,000 $300,000 $1,200,000

Federal $0 $0 $0

State $0 $0
$5,526,000

Other $260,000 $2,500,000
$0

Federal
$0 $480,000

State
$0 $0

Other
$0 $120,000

Federal
$0 $400,000

State
$0 $0

Other
$0 $100,000

Total $860,000
Total $225,000 $645,000
Total $209,000
Total $250,000 $700,000 $2,600,000
Total $1,000,000 $1,500,000 $10,000,000
Total $452,900 $1,400,000
Total
$613,000
Total $300,000 $300,000 $3.000,000
Total $260,000 $2,500.000 $5,526.000
Total $0
$600,000
Total $0
$500,000

Page 193 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 20/2005

Henry

Project: 0003167 Type Work: HOV Lanes

Descp: 1-75 FM SR 54/CLAYTON TO EAGLES LANDING

PKY/HENRY HOV LANES

Lanes: Exist. 8 Prop. 10

Length: 8.16

TlP#: AR-H-05IA

Project: 0003436 Type Work: HOV Lanes

Descp: 1-75 FM EAGLES LANDING PKY TO SR 155 - FOR

HOVLANES Lanes: Exist. 6 Prop. 8

Length: 7.84

TIP#: AR-H-052A

Project: 0003784 Type Work: Intersection Improvement

Descp: SR 3IUS 19/41 AT SR 81/CR 653/UPPER WOOLSEY

ROAD

Length: 0.78

LUMP SUM PROJECT

TlP#: AR-118

Project: 0003903 Type Work: Intersection Improvement Descp: SR 20@ CR 133/AIRLINE ROAD

LUMP SUM PROJECT

Length: 0.42 TlP#: AR-157

Project: 0003905 Type Work: Intersection Improvement
Descp: SR 155 @ CR 650/HAMPTON-LOCUST GROVE ROAD Length: 1.00

LUMP SUM PROJECT

TIP#: AR-157

Project: 0004431 Type Work: New Construction Descp: PATRICK HENRY PKWY FM END OF EXISTING RD
TO EAGLES LANDING Length: 0.47
TlP#: HE-165A

Project: 0004432 Type Work: Widening Descp: ROCK QUARRY ROAD FROM EAGLES LANDING
PARKWAY TO RED OAK RD Length: 1.51
TIP#: HE-16IA

Project: 0004645 Type Work: New Construction

Descp: EAST LAKE ROAD EXTENSION FM SPRINGDALE

RD TO SR 155 PHASE 2

Lanes: Exist. 0 Prop. 2

Length: 0.44

TlP#: HE103B

Project: 0006278 Type Work: Sidewalks Descp: DOWNTOWN STREETSCAPE ALONG E
ATLANTAIWEST STIUS231LEE - LCI Length: 0.00

LUMP SUM PROJECT

TlP#: HE-AR 230

Project: 0006307 Type Work: Water Pollution Mitig. Descp: TOWALIGA RIVER RESTORATION AND WETLAND
MITIGATION Length: 0.00

LUMP SUM PROJECT

TlP#: LUMP

Project: 0006333 Type Work: ATMSIITS Descp: ATMS/I-75 S COMMUNIC/SURVEILANCE FM
HUDSON BRIDGE TO SR 155 Length: 7.84
TlP#: AR-431

Phase Fund PE NHS ROW Bond CST NHS

Year 2006 After 2007 After 2007

Phase Fund PE NHS ROW Bond CST NHS

Year 2006 After 2007 After 2007

Phase Fund ROW STP CST STP

Year Underway
LUMP

Phase Fund ROW Local CST STP

Year LOCL LUMP

Phase Fund ROW Local CST STP

Year LOCL LUMP

Phase Fund CST Bond CST Bond

Year 2005 2005

Phase Fund PE Local ROW Local CST Bond

Year LOCL LOCL 2006

Phase Fund PE Local ROW Local CST RRBS

Year LOCL LOCL 2005

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase Fund CST STP

Year LUMP

Phase Fund PE NHS CST NHS

Year 2005 2006

Federal $6,400,000

State $1,600,000

Other $0

Federal $5,840,000

State $1,460,000

Other $0

Federal $902,700

State $100,300

Other $0

Federal $0
$209,700

State $0
$23,300

Other $111,650
$0

Federat $0
$879,300

State $0
$97,700

Other $4,847,200
$0

Federal $0 $0

State $4,280,000
$994,000

Other $0 $0

Federal $0 $0 $0

State $0 $0
$2,730,000

Other $125,000 $750,000 $1,270,000

Federal $0 $0 $0

State $0 $0
$3,600,000

Other $360,000 $2,000,000 $1,600,000

Federa/
$80,000 $800,000

State
$0 $0

Other
$20,000 $200.000

Federal $567,200

State $141,800

Other $0

Federal $120,000 $7.200,000

State $30,000 $1,800,000

Other $0 $0

Total
$8,000,000
Total
$7,300,000
Total $1,003,000
Total
$111,650
$233,000
Totat $4,847,200
$977,000
Total $4,280,000
$994,000
Total $125,000
$750,000
$4,000,000 Total $360,000
$2,000,000
$5,200.000 Total $100,000
$1,000,000 Total
$709.000
Total $150,000
$9,000,000
Page 194of300



STATE TRANSPORTA TION IMPROVEMENT PROGRAM ZaL2005

Henry

Project: 0006401 Type Work: ATMS/ITS

Descp: ATMS/I-75 S RAMP METERS-HAR FM HUDSON BR

TO CLEVELAND AVE

Lenglh: 17.35

TIP#: AR-443

Project: 0006646 Type Work: Streetscapes Descp: DOWNTOWN LOCUST GROVE STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TlP#:

p'roject: 0006647 Type Work: Multi-use Trail Descp: REEVES CREEK TRAIL & GREENWAY

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 0006650 Type Work: Streetscapes

Descp: DOWNTOWN HAMPTON STREETSCAPE

IMPROVEMENTS

Lenglh: 0.00

LUMP SUM PROJECT

TIP#:

Project: 245380. Type Work: Replace Bridge Descp: SR 20 @ SOUTH RIVER NEWTON-HENRY CO LINE

Lenglh: 0.61 TlP#: NEOI2

Project: 312160- Type Work: Interchange

Descp: 1-75@ JODECO ROAD/CR 824 - INTERCHANGE

IMPROVEMENT Lanes: Exist. 2 Prop. 6

Length: 1.00

TIP#: HE-AR-216

Project: 321530 Type Work: Realignment

Descp: E-W 1-WAY/SR 20 FM HIGHLAND AVE TO LEMON

ST Lanes: Exist. 2

Prop. 4

Length: 1.75

TIP#: HE-020B

Project: 322050 Type Work: Widening

Descp: SR 42 FM SR 138/STOCK'GE TO 1-675 NB

RAMPSI&CLVERT Lanes: Exist. 2 Prop. 4

Length: 2.30

TIP#: CL-064

Project: 323050 Type Work: Replace Bridge

Descp: SR 138 @ BIG COTTON INDIAN CREEK 3 MI E OF

STOCKBRIDGE

Length: 0.22

TlP#: HE-IS7

Project: 323070 Type Work: Intersection Improvement Descp: SR 138 AT MILLERS MILL ROAD/CR 665

Length: 0.57 TlP#: HE-14S
Project: 323075 Type Work: Intersection Improvement Descp: SR 138 AT SR 155

LUMP SUM PROJECT

Length: 0.40 TlP#: AR-IS7

Phase Fund

PE

NHS

CST Bond

Year 2006 2007

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Phase Fund

PE

NHS

ROW Bond

CST Bond

Year Underway
2007 After 2007

Phase PE ROW CST

Fund STP STP STP

Year Underway
2007 After 2007

Phase PE ROW CST

Fund STP STP STP

Year Underway
2007 After 2007

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Phase Fund PE STP PE STP ROW STP CST STP

Phase PE ROW CST

Fund Local Local STP

Year Underway
2005 2006 After 2007
Year LOCL LOCL LUMP

Federal $20,000 $0

State $5,000
$1,500,000

Federal $543,200

State $0

Federal $560,000

State $0

Federal $500,000

State $0

Federal

State

$1,785,600

$446,400

Federal

State

$0 $17,053,000

Federal $9,064,000

State $2,266,000

Federal $1,889,600

State $0

Federal

State

$1,243,200
Federal
$80,000 $80,000
Federal $0 $0
$792,900

$310,800
State
$0 $0
State $0 $0
$88,100

Other $0 $0
Other $135,800
Other $140,000
Other $125,000
Other
$0 Other
$0
Other $0
Other $472,400
Other
$0 Other $20,000 $20,000 Other $30,000 $387,000
$0

Total $25,000
$1,500,000
Total $679,000
Total $700,000
Total $625,000
Total
$2,232,000 Total
$17,053,000
Total $11,330,000
Total $2,362.000
Total
$1,554,000 Total $100,000 $100,000 Total $30.000 $387,000 $881,000

Page 195 of 300

STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 217/2005

Henry

Project: 331980- Type Work: Widening Descp: SR 920/JONESBORO RD FM 1-75 TO 1-WAY PAIR

IMCDONOUGH &BR Lanes: Exist. 2 Prop. 4

Length: 2.86

TlP#: HE-920A

Project: 331990- Type Work: Replace Bridge Descp: SR 920/JONESBORO ROAD @ BIRCH CREEK

Length: 0.25 TIP#: HE 007B

Project: 332467-

Type Work: Replace Bridge

Descp: SR 155@L1TTLE COTTON INDIAN CRK 5 MI N OF

MCDONOUGH

Length: 0.42

TIP#: HE-128A&B

Project: 332945- Type Work: Signals Descp: SR 81 AT KEYS FERRY RD

LUMP SUM PROJECT

Length: 0.42 TlP#: AR-157

Project: 332970. Type Work: Signals Descp: SR 81 AT NEW HOPE RD

LUMP SUM PROJECT

Length: 0.20 TlP#: AR-157

Project: 332915. Type Work: Intersection Improvement Descp: SR 81 AT RACETRACK RD/CR 376

LUMP SUM PROJECT

Length: 0.31 TlP#: AR-157

Project: 332980. Type Work: Signals Descp: SR 155 AT FAIRVIEW RD

LUMP SUM PROJECT

Length: 0.20 TlP#: AR-157

Project: 333126. Type Work: Replace Bridge Descp: SR 155@WALNUTCREEKATMCDONOUGH CITY
LIMITS Length: 0.43
TlP#: HE-154

Project: 333127. Type Work: Replace Bridge

Descp: SR 155 @ BIG COTTON INDIAN CREEK 6 MI N OF

MCDONOUGH

Length: 0.57

TlP#: HE-155A&B

Project: 333295- Type Work: Intersection Improvement Descp: SR 155@MILLERS MILL RD/CR 665

LUMP SUM PROJECT

Length: 0.28 TIP#: AR-157

Project: 342970. Type Work: Widening

Descp: SR 920 FM SR 3/US 19-41/CLAYTON TO 1-75 IN

HENRY (REL SR 81)

Lanes: EXist. 2 Prop. 4

Length: 3.59

TlP#: HE-115

Phase Fund PE STP ROW STP CST STP

Year Underway Underway
2005

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Local

ROW Local

CST STP

Year Underway
2005 2006 2006
Year LOCL LOCL LUMP

Phase Fund PE Local ROW Local CST STP

Year LOCL LOCL LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Phase Fund PE Bridge ROW Local CST Bridge CST STP

Phase PE ROW CST

Fund STP Local STP

Year Underway
2005 2006 2006
Year LUMP LOCL LUMP

Phase Fund PE STP ROW STP CST STP

Year 2006 After 2007 After 2007

Federal

State

$6.730,400 $1.682,600

Federal
$0 $668.800

State
$0 $167,200

Federat
$135,200 $575,200 $640.000
Federat $0 $0
$30,600

State
$33,800 $143,800 $160.000
State $0 $0
$3,400

Federal $0 $0
$32,400

State $0 $0
$3,600

Federal
$0 $229,500

State
$0 $25,500

Federal $0 $0
$38.700

State $0 $0
$4.300

Federat

State

$1.240,800
Federat
$0 $57.600 $480,000 Federat $159,300
$0 $1.060.200
Federal $1.200.000

$310,200
State
$0 $14,400 $120.000 State $17.700
$0 $117,800
State $300.000

Other
$0
Other
$0 $0
Other
$0 $0 $0 Other $0 $113,400 $0
Other $0 $0 $0
Other
$112,700 $0
Other $0 $0 $0
Other
$0
Other
$120,000 $0 $0
Other $0
$50.000 $0
Other $0

Total
$8,413.000
Total $0
$836.000
Total $169,000 $719.000 $800,000 Total
$0 $113.400
$34.000
Total $0 $0
$36.000
Total $112,700 $255.000
Total $0 $0
$43,000
Total
$1.551,000
Total $120,000
$72.000 $600.000 Total $177,000
$50,000 $1.178.000
Total $1,500.000
Page 196 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Henry

Project: 343395- Type Work: Replace Bridge

Descp: SR 20 @ WALNUT CREEK 6 MI NE OF

MCDONOUGH

Length: 0.23

TIP#: IIE-158A

Project: 343396- Type Work: Replace Bridge

Descp: SR 20 @ BIG COTTON INDIAN CREEK 9 MI NE OF

MCDONOUGH

Length: 0.57

T1P#: IIE-\62

Project: 343500- Type Work: Intersection Improvement Descp: OLD CONYERS RD/CR 69 @ FLAT ROCK RD/CR
100 Length: 0.40
T1P#: IIE-144

Project: 351230- Type Work: Signals Descp: WALT STEPHENS RD AT SPEER RD

Length: 0.20 T1P#: IIE-125
Project: 351240- Type Work: Intersection Improvement Descp: FAIRVIEW RD/CR 676 @ THURMAN DR/CR 25

Length: 0.40 T1P#: IIE-147

Project: 721480- Type Work: Widening

Descp: SR 138 FM WALT STEPHENS RD/CLAYTON EAST

TO 1-75/HENRY CO Lanes: Exist. 2 Prop. 4

Length: 4.27

T1P#: CL-D3\

Project: 770321- Type Work: Rail Projects

Descp: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON)

PHASE 2

Length: 0.00

TIP#: AR-26813

Project: M001994 Type Work: Bridges
Descp: BRIDGE JACKING @ SEV LOCS IN BUTTSISPALDINGIHENRY COUNTIES Length: 1.60

LUMP SUM PROJECT

T1P#: AR-3\1

Project: M002785 Type Work: Bridges

Descp: 1-75@ CABIN CREEK IN BUTTS & SR 20 IN HENRY

-DECK REHAB

Length: 0.80

LUMP SUM PROJECT

TIP#:

Project: 1000599 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR HENRY

COUNTY

Length: 0.00

T1P#: AR-HE-1510

Project: 1000996 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR HENRY

COUNTY

Length: 0.00

TIP#: AR-HE-1510

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2006

Federal
$59,200 $888,000

State
$14,800 $222,000

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Federal $1,232,800

State $308,200

Phase PE ROW CST

Fund Local Local STP

Year LOCL LOCL 2006

Federal $0 $0
$320,000

State $0 $0 $0

Phase Fund PE Local ROW Local CST STP

Year LOCL LOCL 2006

Federal $0 $0
$34,000

State $0 $0 $0

Phase Fund PE Local ROW Local CST STP

Year LOCL LOCL 2007

Federal $0 $0
$164,000

State $0 $0 $0

Phase PE ROW CST

Fund NHS NHS NHS

Year Underway Underway
2005

Federal $10,632,000

State $2,658,000

Phase Fund CST NHS

Year 2005

Federal $7,728,000

State $1,932,000

Phase Fund

PE

NHS

CST NHS

Year Underway
LUMP

Federal $1,200,000

State $300,000

Phase Fund

PE

1M

CST 1M

Year LUMP LUMP

Federal $90,000
$900,000

State $10,000 $100,000

Phase Fund CST Transit

Year 2005

Federal $18,305

State $4,576

Phase Fund CST Transit

Year 2006

Federal $19,220

State $4,805

Other $0 $0
Other
$0
Other $40,000 $300,000 $80,000
Other $4,000
$0 $9,000
Other $20,000 $300,000 $41,000
Other
$0
Other $0
Other $0
Other $0 $0
Other $0
Other $0

Total $74,000 $1,110,000
Total
$1,541,000
Total $40,000 $300,000 $400,000
Total $4,000 $0
$43,000
Total $20,000 $300,000 $205,000
Total
$13,290,000
Total $9,660,000
Total $1,500,000
Total $100,000 $1,000,000
Total $22,881
Total $24,025

Page 197 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM W/2QQ5

Henry

Project: T001216 Type Work: Transit Projects

Descp: FY 2001 SECTION 5310 CAPITAL FOR HENRY

COUNTY

Length: 0.00

TlP#: AR.HE.1510

Project: T001364 Type Work: Rail Projects Descp: COMMUTER RAIL ATLANTA/LOVEJOY
(OPERATIONS ASSISTANCE) Length: 0.00
TlP#: AR-268F

Phase Fund CST Transit

Year 2001

Federal $20,181

State $5,045

Other $0

Phase Fund CST CMAQ

Year 2006

Federal $5,500,000

State $0

Other $1,375,000

Total $25,226 Total $6,875,000
Page 198 of 300





STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Houston

Project: 0001018 Type Work: Bicycle/Ped Facility
Desep: DNR REC TRAILS-BAY GALL CREEK GREENWAY FM CORDER TO KIMBERLY Length: 1.07

LUMP SUM PROJECT

TlP#: Q94(1)

Project: 0002336 Type Work: Miscellaneous Improvement
Desep: GA NAT'L FAIRGROUNDS & AGRICENTER LINK TO HISTORIC DOWNTOWN Length: 0.00

LUMP SUM PROJECT

TlP#: Q22(1)

Project: 322965. Type Work: Replace Bridge

Descp: SR 247/US 129 NBL @ ECHECONNEE CREEK

HOUSTON-BIBB CO LINE

Lanes: Exist. 2 Prop. 3

Length: 0.27

TIP#: 1998-1

Project: M002783 Type Work: Bridges

Desep: 1-75@ 2 LOCS IN DOOL Y & 1 LOC IN HOUSTON -

DECK REHAB

Length: 1.20

LUMP SUM PROJECT

TIP#:

Project: TOO0671 Type Work: Transit Projects

Desep: FY 2005 SECTION 5310 CAPITAL FOR WARNER

ROBINS

Length: 0.00

TIP#:

Project: TOO0930 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR WARNER

ROBINS

Length: 0.00

TlP#:

Project: TOO1250 Type Work: Transit Projects

Desep: FY 2007 SECTION 5310 CAPITAL FOR WARNER

ROBINS

Length: 0.00

TlP#:

Phase Fund CST Ree Trails

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

Bridge

CST Bridge

Year Underway
2006

Phase Fund

PE

1M

CST 1M

Year LUMP LUMP

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2007

Federal $100,000
Federal $400,000
Federal $2.400,000
Federal $135.000 $1,350.000
Federal $22.881
Federat $25.170
Federal $25.226

State $0
State $0
State $600,000
State $15.000 $150.000
State $5.720
State $6.293
State $6,307

Other $25,000
Other $100,000
Other $0
Other $0 $0
Other $0
Other $0
Other $0

Total $125,000
Total $500,000
Totat $3,000.000
Total $150,000 $1.500,000
Total $28.601
Totat $31.463
Total $31.533

Page 199 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2a/2QQ5

Irwin

Project: 0001046 Type Work: Widening

Descp: SR 32 FM NE OCILLA BYP TO 4 LANE @CR

2961MITCHELL RD Lanes: Exist. 2 Prop. 4

Length: 19.04

TlP#:

Project: 0004798 Type Work: Widening

Descp: SR 32 FROM EAST OF 1-75/TURNER TO SR

125/IRWIN Lanes: Exist. 2 Prop. 4

Length: 10.34

TlP#:

Project: 0004799 Type Work: Widening Descp: SR 321SR 125 COMMON SECTION

Lanes: Exist. 2 Prop. 4

Length: 4.57 TlP#:

Project: 0005069 Type Work: Widening Descp: SR 32 FM SR 125 TO SR 11

Lanes: Exist. 2 Prop. 4

Length: 5.00 TlP#:

Project: 0006538 Type Work: Streetscapes

Descp: IRWIN CO HISTORIC COURTHOWSE -

STREETSCAPE ONLY

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006539 Type Work: Bicycle/Ped. Facility Descp: OCILLA PEDESTRIAN FACILITIES

LUMP SUM PROJECT

Length: 0.00 TlP#:

Phase PE ROW CST

Fund State State State

Year 2005 After 2007 After 2007

Phase Fund

PE

State

ROW State

CST State

Year 2005 After 2007 After 2007

Phase Fund PE State ROW State CST State

Year 2005 After 2007 After 2007

Phase Fund

PE

State

ROW State

CST State

Year 2005 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Federal $0

Stale $3.900,000

Federal $0

Slale $988,000

Federal $0

Slale $494,000

Federal $0

Slale $494.230

Federal $50,400

Slale $0

Phase Fund CST STP

Year LUMP

Federal $500,000

Slale $0

Other $0
Other $0
Other $0
Other $0
Other $12.600
Other $125,000

Total
$3,900.000
Total
$988,000
Total
$494,000
Total
$494,230 Total
$63,000
Total
$625,000
Page 200 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
2flI2QQ5

Jackson
Project: 0001933 Type Work: Intersection Improvement Descp: SR 98 @ B. WILSON/CR 286 & KING ROAD/CR 536

LUMP SUM PROJECT

Length: 0.42 TIP#:

Project: 0006015 Type Work: Water Pollution Mitig.

Descp: 748 STREAM CREDITS TO MITIGATE PI# 171004

&171005 JACKSON CO

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006119 Type Work: Railroad Crossing Descp: CR 213/JOHN BROOKS ROAD@ CSX #848484L

LUMP SUM PROJECT

Length: 0.20 TIP#:

Project: 0006493 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS@ VAR LOC ALONG
SR 11&SR 98 - JACKSON Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 110620- Type Work: Widening

Descp: 1-85FM N/SR 211 TO N/SR 60 IN JACKSON

COUNTY Lanes: Exist. 4

Prop. 6

Length: 5.94

TlP#: BA-008A&B

Project: 110630- Type Work: Widening Descp: 1-85FM N/SR 60 TO N/SR 11

Lanes: Exist. 4 Prop. 6

Length: 4.60 TlP#:

Project: 110640. Type Work: Widening Descp: 1-85FM N/SR 11 TO N/SR 82

Lanes: Exist. 4 Prop. 6

Length: 3.80 TIP#:

Project: 110650- Type Work: Widening Descp: 1-85FM N/SR 82 TO N/SR 98

Lanes: Exist. 4 Prop. 6

Length: 6.10 TlP#:

Project: 110660- Type Work: Widening Descp: 1-85FM N/SR 98 TO N/SR 15 IN BANKS

Lanes: Exist. 4 Prop. 6

Length: 2.70 TlP#:

Project: 122150- Type Work: Widening

Descp: SR 11/US 129 FM SR 332@TALMO/JACKSON CO

TO SR 323!HALL CO Lanes: Exist. 2 Prop. 4

Length: 6.73

TIP#:

Project: 122160 Type Work: Widening

Descp: SR 15ALT/US 129 FM LAVENDER DR/CLARKE TO

SR 330/JACKSON Lanes: Exist. 2 Prop. 4

Length: 3.71

TIP#: R-33

Phase PE ROW CST

Fund STP STP STP

Year Underway
LUMP LUMP

Phase Fund ROW STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase PE ROW CST

Fund NHS NHS Bond

Year Underway
2005 2007

Phase PE PE CST

Fund NHS NHS Bond

Year Underway
2005 After 2007

Phase PE PE CST

Fund NHS NHS Bond

Year Underway
2005 After 2007

Phase PE PE CST

Fund NHS NHS Bond

Year Underway
2005 After 2007

Phase Fund

PE

NHS

PE

NHS

CST Bond

Year Underway
2005 After 2007

Phase PE ROW ROW CST

Fund NHS NHS NHS NHS

Phase PE ROW CST

Fund STP STP STP

Year Underway Underway
2005 After 2007
Year Underway Underway
2005

Federal
$33,300 $269,100
Federal $28,000

State
$3,700 $29,900
State $7,000

Federal $210,000

State $0

Federal $396,000

State $99,000

Federal

State

$320,000 $0

$80.000 $13,495.000

Federal $1.760.000

State $440.000

Federal $1.360.000

State $340.000

Federal $2.080.000

State $520.000

Federal $880,000

State $220.000

Federal

State

$4.627,200

$1.156,800

Federal

State

$9.212.000

$2.303,000

Other
$0 $0
Other $0

Total
$37,000 $299,000
Total $35,000

Other $0

Total $210,000

Other $0

Total $495,000

Other
$0 $0

Total
$400,000 $13,495,000

Other $0

Total $2,200,000

Other $0

Total $1.700.000

Other $0

Total $2.600.000

Other $0

Total $1,100.000

Other

Total

$0 Other

$5.784,000 Total

$0

$11.515,000

Page 201 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005

Jackson

Project: 122170-

Type Work: Widening

Descp: SR 15 ALTIUS 129 FM SR 330 TO JEFFERSON BYP

@CR104 Lanes: Exist. 2 Prop. 4

Length: 6.70

TIP#:

Project: 122300- Type Work: Widening

Descp: SR 15/US 441 FROM THE CLARKE/JACKSON

COUNTY LINE TO SR 335

Lanes: Exist. 2 Prop. 4

Length: 6.98

TIP#:

Project: 122310- Type Work: Widening Descp: SR 15IUS 441 FM SR 335 TO COMMERCE BYPASS

Lanes: Exist. 2 Prop. 4

Length: 5.19 TlP#:

Project: 122510- Type Work: Bridge Rehab Descp: SR 15 ALT IN JEFFERSON AT BIG CURRY CREEK

Lanes: Exist. 2 Prop. 3

Length: 0.60 TlP#:

Project: M002916 Type Work: Resurface & Maintenance Descp: SR 334 FM SR 15/US 441 TO SR 98

LUMP SUM PROJECT

Length: 12.48 TlP#:

Phase Fund

PE

STP

ROW STP

ROW STP

CST STP

Phase Fund PE State ROW Bond CST Bond

Year Underway Underway
2006 After 2007
Year Underway Underway
2005

Phase Fund PE NHS ROW Bond CST Bond

Year Underway Underway
2005

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2006 After 2007

Phase Fund CST STP

Year 2005

Federal

State

$3,254,400 Federal

$813,600 State

$0 $22,626,000

Federal

State

$0 $20,360,000

Federal $320,000

State $80,000

Federal $1,113,509

State $278,377

Other $0
Other $0
Other
$0 Other
$0
Other $0

Total $4,068,000
Total $22,626,000 Total
$20,360,000
Total
$400,000
Total $1,391,886
Page 202 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM
2!7/2QQ5

Jasper

Project: 0000423 Type Work: Widening

Descp: SR 16 WIDENING AT WEST CITY LIMITS OF

MONTICELLO Lanes: Exist. 2 Prop. 4

Length: 0.87

TIP#:

Project: 0001939 Type Work: New Construction Descp: MONTICELLO NE BYPASS FM SR 16 TO SR 83

Lanes: Exist. 0 Prop. 2

Length: 3.28 TlP#:

Project: 0002337 Type Work: Landscaping
Descp: MONTICELLO DOWNTOWN STREETSCAPE AND SCENIC BYWAY BIKEWAY Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0004444 Type Work: Guardrail

Descp: SR 212 OVER LAKE JACKSON GUARDRAIL AT

APPROACHES

Length: 0040

LUMP SUM PROJECT

TIP#:

Project: 332510- Type Work: Replace Bridge Descp: SR 16 OVER OCMULGEE RIVER AT JASPER
CL(M.L.17.45) Length: 1.17
TlP#:

Project: MOO0355 Type Work: Miscellaneous Improvement
Descp: SR 83 AT CHURCH STREET IN MONTICELLO DRAINAGE IMPROVEMENTS
Length: DAD

LUMP SUM PROJECT

TIP#:

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund CST STP

Phase PE ROW CST

Fund STP STP STP

Phase PE ROW CST

Fund STP STP STP

Phase Fund ROW STP CST STP

Year Underway
2007 After 2007
Year Underway
2007 After 2007
Year LUMP
Year Underway
LUMP LUMP
Year Underway Underway
2005
Year LUMP LUMP

Federal $447,200
Federal $183,200
Federal $400,000
Federal $129,600 $122,400 Federal
$3,628,800 Federal $2,400 $169,600

State $111,800
State $45,800
State $0
State $14,400 $13,600 State
$907,200 State
$600 $42,400

Other $0
Other $0
Other $100,000
Other $0 $0
Other
$0 Other
$0 $0

Total $559,000
Total $229,000
Total $500,000
Total $144,000 $136,000 Total
$4,536,000 Total $3,000 $212,000

Page 203 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Jeff Davis

Project: 533175. Type Work: Replace Bridge

Descp: SR 135/US 221 @ TOWN CREEK 2.9 MILES SOUTH

OF DENTON

Length: 0.45

TlP#:

Project: 533176- Type Work: Replace Bridge Descp: SR 135/US 221 @WHITEHEADCREEK 1 MILE
NORTH OF DENTON Length: 0.87
TlP#:

Project: 533177. Type Work: Replace Bridge

Descp: SR 135/US 221 @ HURRICANE CREEK 6.8 MI SW

OF HAZELHURST

Length: 0.57

TlP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006

Federal $11.200
$1.137,600
Federal $10,400
$1.266,400
Federal $10,400
$1.126,400

State $2.800
$284,400
State $2.600
$316,600
State $2,600
$281,600

Other
$0
$0
Other $0
$0 Other $0 $0

Total $14,000 $1,422,000
Total $13.000
$1.583.000
Total $13.000 $1.408,000

Page 204 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2nt2QQ5

Jefferson
PrOject: 0002341 Type Work: Slreetscapes Descp: WRENS STREETSCAPE PROJECT

LUMP SUM PROJECT

Length: 000 TlP#:

Project: 0006637 Type Work: Streetscapes Descp: DOWNTOWN GATEWAY
IMPROVEMENTS-STREETSCAPE, CROSSWALK Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 222500- Type Work: Widening

Descp: SR 4/US 1 FM CR 104 TO US 1/SR 4 BUS NEAR

WADLEY & JEFFERSON

Lanes: Exist. 2 Prop. 4

Length: 7.10

TlP#:

Project: 231230- Type Work: Passing Lanes

Descp: SR 24/US 221 EB MP 12.6-13.8;WB 10.0-11.3;EB

3.2-4.3

Lanes: Exist. 2 Prop. 3

Length: 3.60

TlP#:

Project: 231260- Type Work: Passing Lanes

Descp: SR 24 PASSING LNS @ 4 LOC BET

WA YNESBORO&LOU'VILLE/JEFFERSON

Lanes: Exist. 2 Prop. 3

Length: 5.28

TlP#:

Project: 232281- Type Work: Replace Bridge Descp: SR 4 BUS- US 1 BUS @ WILLIAMSON SWAMP
CREEK IN WADLEY Length: 0.22
TlP#:

Project: 245390- Type Work: Replace Bridge Descp: SR 17@ BIG CREEK 3 MI SE OF LOUISVILLE

Length: 0.28 TlP#:

Phase Fund CST STP

Year LUMP

Federal $700,000

State $0

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase Fund

PE

Stale

PE

Bond

ROW Bond

CST Slate

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2005 After 2007
Year Underway
2005 2006

Federat

State

$0

$1,407,000

Federal
$40,000 $2,166,400

State
$10,000 $541,600

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2006

Federal
$436,000 $1,995,200

State
$109,000 $498,800

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006 2006
Year Underway Underway
2005

Federal
$10,400 $1,430,400
$272,000 Federal
$1,096.800

State $2,600
$357,600 $68,000 State
$274,200

Other $175,000
Other $125,000
Other
$0 Other
$0 $0 Other $0 $0 Other $0 $0 $0 Other
$0

Total $875,000
Total $625,000
Total
$1,407.000
Total $50,000 $2.708,000
Total $545,000 $2.494,000
Total $13,000 $1,788,000 $340,000 Total
$1,371.000

Page 205 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005

Jenkins
Project: 0006319 Type Work: Replace Bridge Descp: CR 20010LD SAVANNAH ROAD @ SCULLS CREEK

Length: 0.40 T1P#:

Project: 0006638 Type Work: Streetscapes
Descp: COTION AVENUE STREETS CAPE & GREENSPACE PRESERVATION Length: 0.64

LUMP SUM PROJECT

T1P#:

Project: 222540-

Type Work: Widening

Descp: SR 23/SR 121/US 25 SAV RV PKWY FM SR 67 TO

SR 21 & BR [EXC]

Lanes: Exist. 2 Prop. 4

Length: 6.23

TIP#:

Project: 222545-

Type Work: Bridge Rehab

Descp: SR 121/US 25 WIDEN UTILE BUCKHEAD CREEK

BRIDGE

Lanes: Exist. 2 Prop. 4

Length: 0.27

T1P#:

Project: 245365-

Type Work: Replace Bridge

Descp: SR 23@ BEAVERDAM CREEK 11.7 MI NE OF

MILLEN

Length: 0.61

TIP#:

Phase Fund PE Bridge ROW Bridge CST Bridge

Year 2005 2006 After 2007

Phase Fund CST STP

Year LUMP

Federal $40,000 $40,000
Federal $500,000

State $10,000 $10,000
State $0

Phase Fund PE State ROW Bond ROW RRBS CST RRBS
Phase Fund PE Bridge CST Bridge

Year Underway Underway
2005 2006
Year Underway
2006

Federal

State

$0 $0
Federal

$8,135,000 $11,563,000
State

$624,000

$156,000

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 2006

Federal
$16,000 $1,081,600

Slate
$4,000 $270,400

Other $0 $0
Other $125,000
Other
$0 $0 Other $0
Other $0 $0

Total
$50,000
$50,000
Total
$625,000
Total $8,135,000
$11,563,000
Total
$780,000 Total $20,000 $1,352,000
Page206of300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2flI2QQ5

Johnson

Project: 0006557 Type Work: Bicycle/Ped. Facility
Descp: WRIGHTSVILLE PEDESTRIAN FACILITIES - PHASE II Length: 0.00

LUMP SUM PROJECT

T/P#:

Project: 0006668 Type Work: Park & Ride Lot Descp: SR 31/US 319 @ CR 243/IVEY CHAPEL ROAD -
PARK & RIDE LOT Length: 0.38
T/P#:

Project: 222190- Type Work: Passing Lanes

Descp: SR 15 AT 3 LOC BTWN WRIGHTSVILLE &

TENNILLE/& WASHINGTON

Lanes: EXist. 2 Prop. 3

Length: 4.03

T/P#:

Phase Fund CST STP

Year LUMP

Phase Fund

PE

NHS

CST NHS

Year 2005 2005

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 After 2007

Federal $400,000

State $0

Federal $1.600
$12.800

State $400
$3.200

Federal $92.800

State $23,200

Other $100,000
Other $0 $0
Other $0

Total $500,000
Total $2.000
$16.000
Total $116,000

Page 207 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/712005

Jones

Project: 0001040 Type Work: Widening

Descp: SR 44 FM GRAY BYPASS TO CR 104/MATHIS

ROAD Lanes: Exist. 2

Prop. 4

Length: 10.89

T/P#:

Project: 0006492 Type Work: Striping
Descp: SIGNAGE & STRIPING @ VARIOUS RAIL CROSSINGS IN BIBB & JONES Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 231620- Type Work: Widening

Descp: SR 44 FM MATHIS ROAD/JONES TO US

441IPUTNAM

Lanes: Exist. 2 Prop. 3

Length: 10.73

T1P#:

Project: 333100- Type Work: Miscellaneous Improvement Descp: SR 22iUS 129 FM STEWART ST TO MADISON
ST-DRAINAGE IMPRVMNTS Length: 0.31
T1P#:

Project: 343400- Type Work: Replace Bridge Descp: SR 18 @ WALNUT CREEK 6 MI W OF GRAY

Length: 0.47 T1P#:

Phase Fund PE STP ROW STP CST STP
Phase Fund PE STP CST STP

Phase PE ROW CST

Fund STP STP STP

Phase PE ROW CST

Fund STP STP STP

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year 2007 After 2007 After 2007
Year Underway
LUMP
Year Underway
2006 After 2007
Year Underway
2005 2005
Year Underway Underway
2005

Federat $2,662,400

State $665,600

Federal $48,000

State $0

Federal $4,992.800

State $1,248,200

Federal $217,600 $415,200
Federal

State $54,400 $103,800
State

$999,200

$249,800

Other $0
Other $0
Other $0
Other $0 $0
Other
$0

Totat $3,328,000
Totat $48.000 Total $6,241.000 Totat $272,000 $519.000 Total $1,249,000
Page 208 of 300





STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Lamar

Project: 0004590 Type Work: Water Pollution Mitig.
Descp: 889 STREAM CREDITS FOR PI 322530-/STP-0001-3(31 )SPUR Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 321370. Type Work: Passing Lanes

Descp: SR 18 SB 13.7-15.2IMONROE/EB 2.3-3.6IWB

3.38-5.1ITL 5.10-5.6 Lanes: Exist. 2 Prop. 3

Length: 4.80

TlP#:

Project: 322530. Type Work: New Construction

Descp: BARNESVILLE BYP [TRUCK BYPJ FM SR 7/US 341

N. TO SR 18/US41 Lanes: Exist. 0 Prop. 2

Length: 1.90

TlP#:

Project: 333140. Type Work: Replace Bridge

Descp: SR 18@POTATOCREEK4 MI W OF

BARNESVILLE

Length: 0.27

TIP#:

Project: 343390- Type Work: Replace Bridge Descp: SR 36 @ EDIE CREEK 6 MI N OF BARNESVILLE

Length: 0.22 TIP#:

Project: 343391. Type Work: Replace Bridge Descp: SR 36 @ BUCK CREEK 9.5 MI N OF BARNESVILLE

Length: 0.44 TlP#:

Phase Fund ROW STP

Year LUMP

Federal $28,800

State $7,200

Phase PE ROW CST

Fund STP STP STP

Year Underway
2005 After 2007

Federal $192,000

Phase PE ROW CST

Fund STP STP STP

Year Underway Underway
2005

Federal $2,139,200

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 2007

Federal
$11,200 $815,200

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 2007

Federal
$11,200 $880,000

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2007

Federal
$27,200 $2,320,000

State $48,000
State
$534,800
State $2,800
$203,800
State $2,800
$220,000
State $6,800
$580,000

Other $0

Total $36,000

Other $0

Total $240,000

Other

Total

$0
Other $0 $0
Other $0 $0
Other $0 $0

$2,674,000
Total $14,000
$1,019,000
Total $14,000 $1,100,000
Total $34,000 $2,900,000

Page 209 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM wa005

Lanier

Project: 0000310 Type Work: Intersection Improvement

Descp: SR 31!US 221 @ SR 37 & SR 11/US 129 EAST OF

LAKELAND Lanes: Exist. 2 Prop. 3

Length: 0.32

LUMP SUM PROJECT

TlP#:

Project: 442920. Type Work: Replace Bridge

Descp: SR 64/SR 168 @ ALAPAHA RIVER & OVERFLOW @

BERRIEN/LANIER LN

Length: 1.08

TIP#:

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Year Underway Underway
2006 2006

Federal $27.200
$1.312.800
Federal
$2.960.800 $299,200

State $6,800
$328.200
State
$740.200 $74.800

Other
$0
$0 Other

Total $34.000 $1.641.000
Total

$0

$3.701.000

$0

$374.000

Page 210 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 2aJ2QQ5

Laurens
Project: 0000542 Type Work: Widening Descp: SR 257 FROM 1-16TO INDUSTRIAL BLVD

Lanes: Exisl. 2 Prop. 4

Length: 2.86 TlP#:

Project: 0005923 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCATIONS IN LAURENS CO Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006476 Type Work: Guardrail

Descp: SR 117 FM EASTMAN CITY TO SR 29/US 441 S OF

DUBLIN @ 17 LOCS

Length: 20.74

LUMP SUM PROJECT

TlP#:

Project: 0006558 Type Work: Streetscapes Descp: DUBLIN PATHWAY & ENHANCEMENT

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 210940- Type Work: Interchange Descp: 1-16SAFETY UPGRADES @ SR 338, SR 257 & SR
19 Length: 1.20
TlP#:

Project: 232270- Type Work: Replace Bridge

Descp: SR 26/US 80 @ PUGHES CREEK 2.8 MI SE OF

BREWTON

Length: 0.22

TlP#:

Project: 245395- Type Work: Replace Bridge

Descp: SR 19@ WHITEWATER CREEK 13.2 MI SE OF

DUBLIN

Length: 0.20

TlP#:

Project: 245396- Type Work: Replace Bridge Descp: SR 19 @ BIG FLAT CREEK 13 MI SE OF DUBLIN

Length: 0.25 TlP#:

Project: 245397-

Type Work: Replace Bridge

Descp: SR 19@ LITTLE FLAT CREEK 12.5 MI SE OF

DUBLIN

Length: 0.31

TlP#:

Project: 245398 Type Work: Replace Bridge

Descp: SR 199 @ PUGHES CREEK 6.9 MI SE OF EAST

DUBLIN

Length: 0.27

TlP#:

Project: 262040- Type Work: New Construction

Descp: DUBLIN BYP FM US 441 @.5 MI N OF FIRE TOWER

RD NW TO US 441 Lanes: Exist. 0 Prop. 4

Length: 8.74

TlP#:

Phase Fund

PE

STP

ROW State

ROW STP

CST STP

Phase Fund CST STP

Year Underway Underway Underway
2005
Year LUMP

Federal

State

$4,653,600
Federal $480,000

$1,163,400
State $120,000

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund CST STP

Year LUMP

Federal
$90,000 $675,000
Federal $500,000

State
$10,000 $75,000
State $0

Phase Fund

PE

1M

CST 1M

Year Underway
2005

Federal $5,268,600

State $585,400

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2007

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Phase Fund

PE

Bridge

ROW STP

CST Bridge

Year Underway Underway
2005

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Phase Fund

PE

State

ROW Bond

ROW State

ROW Bond

ROW State

CST Bond

Year Underway
2005 Underway
2005 Underway
2007

Federal

State

$916,000 Federal

$229,000 State

$867,471 Federal

$216,868 State

$884,000 Federal

$221,000 State

$888,000 Federal

$222,000 State

$1,128,800

$282,200

Federal

State

$0

$4,230,000

$0

$6,788,000

$0 $29,076,000

Other

Total

$0
Other $0

$5,817,000
Total $600,000

Other
$0 $0
Other $125,000

Total
$100,000 $750,000
Total $625,000

Other $0

Total $5,854,000

Other

Total

$0 Other

$1,145,000 Total

$0 Other

$1,084,339 Total

$0 Other

$1,105,000 Total

$0 Other

$1,110,000 Total

$0

$1,411,000

Other $0 $0 $0

Total $4,230,000 $6,788,000 $29,076,000 Page 211 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Laurens

Project: MOO2704 Type Work: Rest Area Descp: 1-16 DUBLIN REST AREAS WATER AND SEWER
SERVICE IN LAURENS CO Length: 0.80

LUMP SUM PROJECT

TlP#:

Project: MOO2901 Type Work: Resurface & Maintenance

Descp: SR 257 FM SR 126 IN DODGE TO CR 318/RAIL

ROAD ST IN LAURENS

Length: 6.67

LUMP SUM PROJECT

TlP#:

Phase Fund

PE

1M

CST 1M

Year Underway
LUMP

Phase Fund CST STP

Year LUMP

Federal $3,397,500
Federal $547,200

State $377,500
State $136,800

Other $0

Total $3,775,000

Other
$0

Total $684,000

Page212of300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Lee

Project: 0000666 Type Work: Railroad Crossing

Descp: EASTWEST CONN IN LEESBURG @ NS

#TEMP177

Length: 0040

LUMP SUM PROJECT

TIP#:

Project: 0001420 Type Work: New Construction

Descp: LEESBURG NORTH BYPASS/SR RELOC FM SR

3/US 19 EAST TO SR 195

Lanes: Exist. 0 Prop. 2

Length: 5.90

TIP#: H/R-99-l3

Project: 431730. Type Work: Widening

Descp: SR 91/PHILEMA RD FM CR 5/GRAVES SPGS RD

NE TO SR 32 Lanes: Exist. 2 Prop. 4

Length: 5.94

TIP#: H/R-99-l2

Project: 432090. Type Work: Replace Bridge Descp: SR 32 @ MUCKALEE CREEK APP 2.5 Ml E OF
LEESBURG Length: 0.69
TlP#: SRl

Project: 432092. Type Work: Replace Bridge Descp: SR 32@ FLINT RIVER AND OVERFLOW AT THE
LEEIWORTH COUNTY LN. Length: 1.17
TlP#: OR-3

Project: 462395. Type Work: Widening

Descp: SR 3/US 19 FM NORTH OF CR 151 NW TO SUMTER

CL @ SMITHVILLE

Lanes: Exist. 2 Prop. 4

Length: 8.98

TlP#:

Project: T001285 Type Work: Transit Projects Descp: Leesburg Train Depot Rennovation and Restoration

Length: 0.00 TIP#:

Phase Fund CST STP

Year LUMP

Federal $100,000

State $0

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Federal $160,000

State $40,000

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Federal $1,040,000

State $260,000

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway
2005

Federal $2,217,600

State $554,400

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 2005

Phase PE ROW ROW CST

Fund State E02 RRBS RRBS

Phase Fund CST Transit

Year Underway Underway Underway
2007
Year 2005

Federal
$45,600 $4,904,000

State
$11,400 $1,226,000

Federal

State

$0
Federal $294,678

$19,856,000
State $0

Other $0

Total $100,000

Other $0

Total $200,000

Other $0

Total $1,300,000

Other

Total

$0
Other $0 $0
Other

$2,772,000
Total $57,000 $6,130,000
Total

$0
Other $73.669

$19,856,000
Total $368,347

Page 213 of 300

STATE TRANSPORTA nON IMPROVEMENT PROGRAM Za12QQ5

Liberty
Project: 0000455 Type Work: Descp: SR 38IUS 84 AT SR 196

Intersection Improvement

Length: 0.83 TlP#:

Project: 0004917 Type Work: Widening

Descp: SR 119/AIRPORT ROAD FROM US 84 TO SR 196 IN

HINESVILLE

Lanes: Exist. 2 Prop. 4

Length: 3.24

TlP#:

Project: 0006484 Type Work: Railroad Crossing Descp: CR 39/ROGERS PASTURE ROAD @ CSX #637342M

LUMP SUM PROJECT

Length: 0.40 TlP#:

Project: 520781. Type Work: Widening Descp: SR 196 FM US84/SR 38 TO SR 25/US 17 SW OF 1-95

Lanes: Exist. 2 Prop. 4

Length: 8.73 TlP#:

Project: 521190. Type Work: Replace Bridge Descp: SR 196@ BAKER SWAMP SLOUGH

Lanes: Exist. 2 Prop. 5

Length: 0.32 TlP#:

Project: 522570. Type Work: New Construction

Descp: US 84 CONN FM 1 MI S SR 196/US84 INT TO US 84

S FLEMINGTON

Lanes: Exist. 0 Prop. 4

Length: 3.70

TlP#:

Project: 532600. Type Work: Passing Lanes

Descp: SR 144 PASSING LANES THROUGH FT

STEWART/BRYAN-LIBERTY

Lanes: Exist. 2 Prop. 3

Length: 5.01

TlP#:

Phase Fund PE NHS ROW NHS CST STP

Year Underway Underway
2005

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway
2006

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway
2006

Phase Fund PE NHS ROW NHS CST NHS

Year Underway
2006 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
2006 After 2007

Federal

State

$921,600
Federal $4,000

$230,400
State $1,000

Federal $140,000

State $0

Federal

State

$9,919,200 $2,479,800

Federal

State

$1,164,000 Federal $864,800

$291,000 State $216,200

Federal $763,200

State $190,800

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0

Total
$1.152.000
Total $5,000
Total
$140,000
Total
$12,399,000 Total
$1,455,000 Total
$1.081,000
Total
$954,000
Page 214 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM ZmZQQ5

Lincoln
Project: 0000759 Type Work: Realignment Descp: SR 79 RELOCATION USING CR 278 FM SR 43 TO
SR 79 & BR Length: 2.00
T1P#:

Project: 0001370 Type Work: Replace Bridge

Descp: SR 43/US 378 @ SAVANNAH RIVER 6.8 MI E OF

LINCOLNTON @ S.C.

Length: 0.60

T1P#:

Project: 0004454 Type Work: Intersection Improvement

Descp: SR 47 AT CS 514/ELAM HEIGHTS & LILLIAN SIMS

IN LINCOLNTON CL

Length: 0.11

LUMP SUM PROJECT

T1P#:

Project: 231360. Type Work: Passing Lanes

Descp: SR 47 FM SR 43 CONN TO .5 NW OF CR 80 - TWO

PASSING LANES Lanes: Exist. 2 Prop. 3

Length: 1.52

TIP#:

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 2007

Federal $385,600
Federal $8,000
Federal $1,710
$124,200 Federal
$88,000 $1,540,800

State $96,400
State $2,000
State $190
$13,800
State $22,000 $385,200

Other $0
Other $0
Other $0 $0
Other $0 $0

Total $482,000
Total $10,000
Total $1,900
$138,000 Total $110,000 $1,926,000

Page 215 of 300

STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM 2t7I2QQ5

Long

Project: 532600-

Type Work: Passing Lanes

Descp: SR 144 PASSING LANES THROUGH FT

STEWART/BRYAN-LIBERTY

Lanes: Exist. 2 Prop. 3

Length: 5.01

TlP#:

Phase PE ROW CST

Fund STP STP STP

Year Underway
2006 After 2007

Federal $763,200

State $190,800

Other $0

Total $954,000




Page216of300

.e',

STATE TRANSPORTATION IMPROVEMENT PROGRAM WaDD5

Lowndes
Project: 0000083 Type Work: Bicycle/Ped. Facility Descp: VALDOSTA MULTI-USE TRAIL

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0000684 Type Work: Replace Bridge

Descp: CS 1191ITUCKER ROAD @ DUKES BAY CANAL IN

SOUTH VALDOSTA

Length: 0.21

TlP#:

Project: 0000762 Type Work: Widening

Descp: 1-75FM NORTH OF SR 133 TO COOK COUNTY

LINE - PHASE 2 Lanes: Exist. 4 Prop. 6

Length: 13.40

TIP#:

Project: 0000837 Type Work: Widening

Descp: JERRY JONES RD/CR 784 FROM GORNTO RD TO

JADAN PLACE Lanes: Exist. 2 Prop. 4

Length: 1.66

TlP#:

Project: 0001566 Type Work: Turn Lanes Descp: SR 38/US 84 MEDIAN TURN LANES FROM
VALDOSTA TO LANIER CO Length: 13.03
TIP#:

Project: 0003896 Type Work: Landscaping Descp: 1-75 INTERSTATE GATEWAY LANDSCAPING

LUMP SUM PROJECT

Length: 1.00 TlP#:

Project: 0005950 Type Work: Turn Lanes
Descp: SR 125@CR 784/NORTHSIDE DR & SR 133@ CR 4851RIVER ST Length: 1.09

LUMP SUM PROJECT

TlP#:

Project: 0006440 Type Work: Intersection Improvement Descp: SR 1024/INNER PERIMETER RD @ SR 94

LUMP SUM PROJECT

Length: 0.80 TIP#:

Project: 422710- Type Work: Bridges

Descp: SR 38/US 84/W. HILL AVE GRADE SEPARATION AT

NORFOLK SOU. RR

Length: 0.32

TIP#:

Project: 431480-

Type Work: Widening

Descp: CR 868 (OLD US 41) FM SR 7/N VALDOSTA RD TO

SR 122 Lanes: Exist. 2

Prop. 4

Length: 7.33

TIP#:

Project: 432100-

Type Work: Replace Bridge

Descp: SR 31 AT WITHLACOOCHEE RIVER AT THE

GA-FLA STATE LINE

Length: 0.33

TlP#:

Phase PE ROW CST

Fund Local Local STP

Year LOCL LOCL LUMP

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2007

Phase Fund PE NHS ROW NHS CST Bond

Year 2005 2007 After 2007

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2006

Phase Fund PE NHS CST NHS

Year Underway
2007

Phase Fund CST STP

Year LUMP

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase PE ROW CST

Fund STP STP STP

Year Underway
LUMP LUMP

Phase Fund PE STP ROW STP CST STP

Year Underway
2006 2007

Phase PE ROW CST

Fund STP STP STP

Year Underway
2006 After 2007

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2006

Federal $0 $0
$759,200

State $0 $0 $0

Other $0 $0
$189,800

Federal
$0 $208,000

State
$0 $52,000

Other
$0 $0

Federal $2,400,000 $9,273,600

State $600,000 $2,318,400

Other $0 $0

Federal
$0 $1,400.000

State
$0 $350.000

Federal $4,644.800

State $1,161.200

Other $0 $0
Other $0

Federal $1.000.000

State $250,000

Other $0

Federal
$64.800 $1,269,000

State
$7.200 $141,000

Federal
$13.500 $225,000

State
$1,500 $25,000

Federal
$2,150,400 $5,504.800

State
$537,600 $1.376,200

Federal $1,986,400

State $496,600

Other $0 $0
Other $0 $0
Other $0 $0
Other $0

Federal
$35,200 $2,147.200

State

Other

$8,800 $536,800

$0 $1,660,000

Total $0 $0
$949,000
Total $0
$260,000
Total $3.000.000 $11,592,000
Total $0
$1.750,000
Total $5,806,000
Total $1.250.000
Total $72.000
$1,410.000
Total $15.000
$250.000
Total $2.688.000 $6.881.000
Total $2,483.000
Total $44.000
$4.344.000

Page 217 of 300

STATE TRANSPORTA TJON IMPROVEMENT PROGRAM zal2QQ5

Lowndes
Project: 432150- Type Work: Replace Bridge Descp: SR 122@MEETINGHOUSE CK & LITTLE RIVER
BROOKS-LOWNDES CO LN Length: 1.09
TIP#:

Project: 442645- Type Work: Replace Bridge

Descp: CR 781/STATEN ROAD @WITHLACOOCHEE

RIVER

Length: 0.20

TlP#:

Project: 442960- Type Work: Replace Bridge

Descp: SR 122@WITHLACOOCHEE RIVER APP 4.5 MI E

OF HAHIRA

Length: 0.81

TIP#:

Project: 450200- Type Work: Widening

Descp: N. FORREST ST IN VALDOSTA FM PARK AVE/SR

31 TO BEMISS ROAD Lanes: Exist. 2 Prop. 5

Length: 3.20

TlP#:

Project: 450510- Type Work: Widening

Descp: N OAK ST EXT/MT ZION CH RD FM SR 7/N

VALDOSTA TO FORREST ST

Lanes: Exist. 2 Prop. 4

Length: 2.47

TIP#:

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 2006

Federal
$37,600 $5,304,800

State
$9,400 $1,326,200

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2006

Federal
$0 $2,180,800

State
$0 $545,200

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Federal $2,267,200

State $566,800

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2006

Federal
$0 $5,268,000

State
$0 $1,317,000

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2007

Federal
$0 $4,320,000

State
$0 $1,080,000

Other $0 $0
Other $10,000
$0
Other
$0
Other $0 $0
Other $0 $0

Total
$47,000
$6,631,000
Total $10,000 $2,726,000
Total $2,834,000
Total
$0
$6,585,000
Total
$0
$5,400,000
Page 218 of300

...'''

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Lumpkin

Project: 0000565 Type Work: Replace Bridge

Descp: AURARIA ROADICR 226 OVER CROOKED CREEK

SE OF DAHLONEGA

Length: 0.22

TIP#:

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2007

Federal
$0 $554,400

State
$0 $138,600

Other
$0 $0

Total
$0 $693,000

Page 219 of 300

STATE TRANSPORTA nON IMPROVEMENT PROGRAM 21712005

Macon
Project: 322285- Type Work: Replace Bridge Descp: SR 90 @ CSX RR SOUTH OF IDEAL NEAR CR 57

Length: 0.90 TlP#:

Project: 333070. Type Work: Intersection Improvement Descp: SR 128 @SR 90 & SR 127; SR 26 @ SR 49 & SR
224 & SIGNING Length: 2.60
TlP#:

Project: 343340. Type Work: Replace Bridge Descp: SR 240 @ BUCK CREEK APP 5 MI S OF IDEAL

Length: 0.66 TlP#:

Project: 343350. Type Work: Replace Bridge

Descp: SR 329 @ HOGCRAWL CREEK 7.0 MILES E OF

MONTEZUMA

Length: 0.57

TlP#:

Phase Fund ROW Bridge CST Bridge

Year 2005 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 After 2007

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 After 2007

Federal $30,400
Federal $162,000
Federal $24,000
Federal $16,000

State $7,600
State $40,500
State $6,000
State $4,000

Other
$0

Total $38,000

Other
$0

Total $202,500

Other
$0

Total $30,000

Other
$0

Total $20,000

Page220of300

'..~e''

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I2005

Madison

Project: 0001047 Type Work: Passing Lanes

Descp: SR 98 PASSING LANES AT 2 LOCATIONS

BETWEEN SR 8 AND SR 172

Lanes: Exist. 2 Prop. 3

Length: 2.45

TlP#:

Project: 0001583 Type Work: Turn Lanes

Descp: SR 8/US 29 MED TN LNS FM NE OF ATHENS TO

OLD SR 106IMADISON

Length: 3.66

TlP#: R-75

Project: 0005531 Type Work: Replace Bridge

Descp: SR 191 @ SCULL SHOAL CREEK 4 MILES NE OF

DANIELSVILLE

Length: 0.20

TlP#:

Project: 122100. Type Work: Widening

Descp: SR 72 FM EAST OF SR 172 TO THE WEST CITY

LIMITS OF COMER Lanes: Exist. 2 Prop. 4

Length: 2.93

TlP#:

Project: 142280. Type Work: Replace Bridge

Descp: SR 172 @ SOUTH FORK BROAD RIVER 2.5 MI W

OF COMER

Length: 0.19

TlP#:

Phase PE ROW CST

Fund STP STP STP

Year 2007 After 2007 After 2007

Phase Fund

PE

STP

CST STP

Year Underway
2006

Federal $120,000

State $30,000

Federal $4,048,000

State $1,012,000

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2007 After 2007

Phase PE PE ROW CST

Fund Slate Bond Bond Bond

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2006 After 2007
Year Underway Underway
2005

Federal $40,000

State $10,000

Federal

State

$0

$7,100,000

Federal

State

$769,600

$192,400

Other $0
Other $0
Other $0
Other $0
Other $0

Total $150,000
Total $5,060,000
Total $50,000
Total $7,100,000
Total $962,000

Page 221 of 300

STATE TRANSPOR TATION IMPROVEMENT PROGRAM
ZmZQQ5

Marion
Project: 0006559 Type Work: Sidewalks Descp: BUENA VISTA SIDEWALK PROJECT

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 343356. Type Work: Replace Bridge Descp: SR 137@ BUCK & GIN CREEKS WEST OF
TAZEWELL CITY LIMITS Length: 0.95
TIP#:

Phase Fund CST STP

Year LUMP

Federal $72.800

State $0

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 After 2007

Federal $32.000

Slate $8,000

Other
$18,200

Total $91.000

Other $0

Total $40.000

Page222of300

''.....''''

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zaJ2005

McDuffie

Project: 0000766 Type Work: Interchange

Descp: 1-20UPGRADES @ SR 47;SR388/COLUMIA & SR

150IMCDUFFIE

Length: 7.02

TlP#: 1M -4

Project: 0001999 Type Work: Intersection Improvement

Descp: SR 10/US 78fTHOMSON EAST BYPASS AT SR

223/WHITE OAK RD

Length: 0.80

LUMP SUM PROJECT

TlP#:

Project: 0004291 Type Work: Median Work Descp: SR 10/17 FM CR 26IDALLAS DR TO CR
308IHARRISON RD-ADD MEDIAN Length: 168
TlP#:

Project: 0006315 Type Work: Water Pollution Mitig.

Descp: 99.95 WETLAND CREDITS TO MITIGATE PI#

262400- MCDUFFIE CO

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006420 Type Work: Barriers

Descp: 1-20FM SR 80 TO RICHMOND COUNTY - CABLE

MEDIAN BARRIERS

Length: 29.52

LUMP SUM PROJECT

TlP#:

Project: 0006607 Type Work: Streetscapes Descp: DOWNTOWN WALKWAY REVITALIZATION PLAN

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 232320- Type Work: Replace Bridge

Descp: SR 47/US 221 @ HEADSTALL CREEK 5.3 MI S OF

DEARING

Length: 0.27

TlP#:

Project: 262400- Type Work: New Construction

Descp: THOMSON E BYP FM SR 17 @ CR 311 NE NEW

LOC TO SR 17 @ CR 20

Lanes: Exist. 0 Prop. 4

Length: 7.50

TIP#:

Phase Fund CST 1M

Year 2005

Federal $10,260,000

State $1,140,000

Phase PE ROW CST

Fund STP STP STP

Year Underway
LUMP LUMP

Phase PE ROW CST

Fund STP STP STP

Year 2007 After 2007 After 2007

Phase Fund ROW STP

Year LUMP

Federal
$22,500 $572,400
Federal $256,000

State
$2,500 $63,600
State $64,000

Federal $160,000

State $40,000

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $2,104,200

State $233,800

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2007

Phase Fund

PE

State

ROW State

ROW RRBS

CST RRBS

Year Underway Underway Underway
2006

Federal

State

$997,600 Federal

$249,400 State

$0 $26,213,000

Other $0
Other $0 $0
Other $0
Other $0
Other $0
Other $125,000
Other $0
Other
$0

Total $11,400,000
Total $25,000 $636,000 Total $320,000
Total $200,000
Total $2,338,000
Total $625,000
Total $1,247,000
Total
$26,213,000

Page 223 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM wa005

McIntosh

Project: 0005949 Type Work: Multi-use Trail

Descp: SAPELO ISLAND WALKING TRAIL - MCINTOSH

COUNTY

Length: 0.11

LUMP SUM PROJECT

TIP#:

Project: 0006540 Type Work: Sidewalks Descp: DARIEN PEDESTRIAN CORRIDOR - PHASE III

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 511110. Type Work: Widening

Descp: 1-95 FM JUST N OF AL TAMAHA RIVER BR @

GLYNN COUNTY LN

Lanes: Exist. 4 Prop. 6

Length: 4.12

TlP#:

Project: 511120- Type Work: Widening

Descp: 1-95 FM 1-MILE NORTH OF SR 251 TO SR 57 --

PHASE 1

Lanes: Exist. 4 Prop. 6

Length: 941

TlP#:

Phase Fund CST STP

Year LUMP

Federal $214,400

State $0

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase Fund

PE

NHS

PE

NHS

CST Bond

Year Underway
2005 After 2007

Phase Fund

PE

NHS

PE

NHS

ROW NHS

CST Bond

Year Underway
2005 2006 2007

Federal $640,000

State $160,000

Federal

State

$480,000 $9,600 $0

$120,000 $2,400
$35,000,000

Other $53,600
Other $125,000
Other $0
Other $0 $0 $0

Total
$268,000
Total
$625,000
Total $800,000 Total
$600,000
$12,000
$35,000,000
Page 224 of 300

)'....'' ..''

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7/2005

Meriwether

Project: 0005532 Type Work: Replace Bridge

Descp: SR 851N MANCHESTER LOCATED @ CSX

RAILROAD

Length: 0.20

TtP#:

Project: 0006625 Type Work: Streetscapes
Descp: CITY OF MANCHESTER DOWNTOWN STREETSCAPEIMPROVEMENTPROGRAM Length: 0.00

LUMP SUM PROJECT

TtP#:

Project: 333180. Type Work: Replace Bridge

Descp: SR 85 SR 74 @ PAPPYS CREEK .5 MI N OF

WOODBURY

Length: 0.60

TtP#:

Project: 333181- Type Work: Replace Bridge

Descp: SR 85 SR 74 @ RED OAK CREEK 3.5 MI N OF

WOODBURY

Length: OAO

TIP#:

Project: 333182. Type Work: Replace Bridge

Descp: SR 85 SR 74 @ WHITE OAK CREEK A MI N OF

ALVATON

Length: 054

TtP#:

Project: 333184. Type Work: Replace Bridge

Descp: SR 85 AL T @ POUND CREEK 2 MI S OF

WOODBURY

Length: 0.22

TtP#:

Project: 333200 Type Work: Replace Bridge Descp: SR 85 @ CANE CREEK 1.7 MI S OF WOODBURY

Length: 0.24 TtP#:

Project: 333202 Type Work: Replace Bridge

Descp: SR 18IUS 27 ALT. @ KENDALL CREEK 2 MI S OF

GREENVILLE Lanes: Exist. 2 Prop. 3

Length: 0.38

TIP#:

Project: MOO0890 Type Work: Miscellaneous Improvement Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN
DISTRICT 3 Length: 0.00

LUMP SUM PROJECT

TtP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund ROW STP CST STP

Year 2005 2007 After 2007
Year LUMP
Year Underway Underway
2005
Year Underway
2005 After 2007
Year Underway Underway
2005
Year Underway Underway
2005
Year Underway
2005 2007
Year Underway Underway
2005
Year Underway
LUMP

Federal $80,000 $40,000
Federal $422,400
Federal
$1,461,600 Federal $9,600
Federal
$1,808,800 Federal
$1,015,200 Federal $24,000
$3,284,000 Federal
$1,278,400 Federal $236,000

State $20,000 $10,000
State $0
State
$365,400 State
$2,400
State
$452,200 State
$253,800 State
$6,000 $821,000 State
$319,600 State $59,000

Other $0 $0
Other $105,600
Other
$0 Other
$0
Other
$0 Other
$0 Other
$0 $0 Other
$0 Other
$0

Total $100,000
$50,000
Total $528,000
Total
$1,827,000 Total $12,000
Total
$2,261,000 Total
$1,269,000 Total $30,000
$4,105,000 Total
$1,598,000 Total $295,000

Page 225 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM WIZ005

Miller
Project: 0001381 Type Work: Replace Bridge Descp: SR 91 @ DRY CREEK 9.5 MI S OF COLQUITT

Length: 0.32 TIP#:

Project: 0005308 Type Work: Pavement Rehab Descp: OLD ALBANY RD FM SR 91 TO SR 45

Length: 2.70 TlP#:

Project: 0008543 Type Work: Sidewalks Descp: MILFORD STREET SIDEWALK PROJECT

LUMP SUM PROJECT

Length: 0.28 TIP#:

Project: 422210- Type Work: Widening

Descp: SR 1IUS 27 FR W CL @ COLQUITT TO CR

279/DAMASCUS-HILTON RD

Lanes: Exist. 2 Prop. 4

Length: 9.30

TlP#:

Project: 470880- Type Work: Replace Bridge Descp: CR 14 SOUTH OF BABCOCK @ BIG DRAIN CREEK
Length: 0,50 TlP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006

Phase PE ROW CST

Fund STP Local STP

Year 2007 LOCL After 2007

Phase Fund CST STP

Year LUMP

Phase Fund

PE

State

PE

Bond

ROW Bond

ROW Bond

CST Bond

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway Underway Underway
2005 2006 Year Underway LOCL 2007

Federal
$8,000 $788,800
Federal $108,000
$0

State
$2,000 $197.200
State $27,000
$0

Federal $224,000

State $0

Federal

State

$0 $0 Federal

$6,672,000 $11,562,000
State

$0 $132,800

$0 $33,200

Other $0 $0
Other $0
$6,000
Other $56.000
Other
$0 $0 Other $0 $0

Total
$10.000
$986.000
Total
$135,000 $6.000
Total
$280,000
Total $6.672.000
$11,562.000 Total $0 $166,000
Page 226 of 300

..-.-.0"''

STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 2t7/2005

Mitchell

Project: 0001035 Type Work: Passing Lanes Descp: SR 93 FM CAIRO/GRADY CO TO

PELHAM/MITCHELL CO AT 3 LOCATIONS

Lanes: Exist. 2 Prop. 3

Length: 9.05

TlP#:

Project: 0003766 Type Work: Railroad Crossing Descp: SR 65/93 @ GFRN #637120D

LUMP SUM PROJECT

Length: 0.01 TIP#:

Project: 0004908 Type Work: Widening

Descp: SR 37 FROM EXISTING 4 LANE TO EAST OF SR 3

IN CAMILLA

Lanes: Exist. 2 Prop. 4

Length: 0.43

TlP#:

Project: 0004909 Type Work: Widening DfiSCP: SR 112 FROM SR 97 TO SR 31N CAMILLA

Lanes: Exist. 2 Prop. 4

Length: 1.84 TIP#:

Project: 0005293 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS AT VAR LOC ALONG

SR 38/US 84 & SR 93

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006544 Type Work: Streetscapes Descp: PELHAM STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006545 Type Work: Streetscapes Descp: CAMILLA EAST BROAD STREETS CAPE
IMPROVEMENTS Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006943 Type Work: Water Pollution Mitig. Descp: 95.21 ACRES OF WETLAND IN
MITCHELL-RACCOON CREEK MITIGATION Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 422690- Type Work: Bridge Rehab Descp: SR 3/US 19- SR 300 SBL @ WETHINGTON
SLOUGH S OF BACONTON Length: 0.22
TlP#:

Project: 422691- Type Work: Bridge Rehab

Descp: SR 3IUS 19- SR 300 SBL @ RACCOON CRK SOUTH

OF BACONTON

Length: 0.22

TlP#:

Project: 442740- Type Work: Replace Bridge

Descp: CR 307 AT BIG SLOUGH AND OVERFLOW IN

NORTH CAMILLA

Length: 0.52

TlP#:

Phase Fund PE STP ROW STP CST STP

Year 2007 After 2007 After 2007

Phase Fund

PE

STP

CST STP

Year LUMP LUMP

Federal $160,000
Federal $6,000
$175,000

State $40,000
State $0 $0

Phase Fund

PE

STP

ROW STP

CST STP

Year 2007 After 2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year 2007 After 2007 After 2007

Phase Fund ROW Local CST STP

Year LOCL LUMP

Federal $112,640

State $28,160

Federal $452,960

State $113,240

Federal $0
$398,400

State $0
$99,600

Phase Fund CST STP

Year LUMP

Federal $565,600

State $0

Phase Fund CST STP

Year LUMP

Federat $280,800

State $0

Phase Fund CST STP

Year LUMP

Federal $2,486,400

State $621,600

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2007 After 2007

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2007 After 2007

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2005

Federal $8,000

State $2,000

Federal $8,000

State $2,000

Federal
$0 $800,000

State
$0 $200,000

Other $0
Other $0 $0
Other $0
Other $0
Other $0 $0
Other $141,400
Other $70,200
Other $0
Other $0
Other $0
Other $50,000
$0

Total $200,000
Total $6,000
$175,000
Total $140,800
Total $566,200
Total $0
$498,000
Total $707,000
Total $351,000
Total $3,108,000
Total $10,000
Total $10,000
Total $50,000 $1,000,000

Page 227 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM ZmZQQ5

Monroe
Project: 0000685 Type Work: Replace Bridge Descp: CR 59/REEDY CREEK ROAD @ TOBESOFKEE
CREEK AND TRIBUTARY Length: 1.00
TIP#:

Project: 0006490 Type Work: Railroad Crossing Descp: CS 611/E. MAIN STREET@ NS #718334V

LUMP SUM PROJECT

Length: 020 TlP#:

Project: 0006696 Type Work: Streetscapes Descp: FORSYTH DOWNTOWN STREETS CAPES

Length: 0.00 TIP#:

Project: 321370. Type Work: Passing Lanes Descp: SR 18 SB 13.7-15.2IMONROE/EB 2.3-3.6IWB

3.38-5.1ITL 5.10-5.6 Lanes: Exist. 2 Prop. 3

Length: 4.80

TIP#:

Project: 343167. Type Work: Replace Bridge

Descp: SR 42 @ ECHECONNEE CREEK 6 MI E OF

CULLODEN

Length: 0.40

TIP#:

Project: 370813- Type Work: Replace Bridge

Descp: CR 158/ROCKY CREEK ROAD@ LITTLE

TOWALIGA RIVER W OF 1-75

Lanes: Exist. 1 Prop. 2

Length: 0.40

TlP#:

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2005

Phase Fund CST STP

Year LUMP

Federal
$0 $1,839,200
Federal $150,000

State
$0 $229,900
State $0

Phase Fund CST H170

Year 2005

Federal $750,000

State $0

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 After 2007

Federal $192,000

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Federal $1,600,000

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2005

Federal
$0 $1,180,000

State $48,000
State
$400,000 State
$0 $295,000

Other $10,000 $229,900 Other
$0
Other $0
Other $0
Other
$0 Other $10,000
$0

Total
$10,000
$2.299,000
Total
$150,000
Total
$750,000
Total
$240,000
Total
$2,000,000 Total
$10,000 $1,475,000
Page 228 of 300

.1
I..' ...,''

STATE TRANSPORTA TION IMPROVEMENT PROGRAM 2012005

Montgomery
Project: 0001366 Type Work: Replace Bridge Descp: SR 30lUS 280 @ OCONEE RIVER AT
WHEELERIMONTGOMERY CO LINE Length: 0.65
TIP#:

Project: 532330. Type Work: Replace Bridge Descp: CR 169fTHOMPSON POND ROAD @ TIGER CREEK
4 MI SE OF TARRYTOWN Length: 0.24
TlP#:

Project: 542410- Type Work: Replace Bridge

Descp: SR 56 @ MILLIGAN CREEK IN CITY LIMITS OF

UVALDA

Length: 0.23

TIP#:

Project: 550610-

Type Work: Turn Lanes

Descp: SR 292NIDALIA FM MORN'SIDE - LOWERY WITH

RIGHT ON WILSON Lanes: Exist. 2 Prop. 3

Length: 1.32

TIP#:

Project: 570760. Type Work: Replace Bridge Descp: CR 12@ TIGER CREEK 3 MI SE OF TARRYTOWN

Length: 0.22 TIP#:

Project: 571455. Type Work: Replace Bridge Descp: CR 1 @ TIGER CREEK 1 MI E OF TARRYTOWN

Length: 0.22 TlP#:

Project: M002617 Type Work: Resurface & Maintenance Descp: SR 292 FM SR 15 TO TOOMBS COUNTY LINE

LUMP SUM PROJECT

Length: 1.86 TIP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 After 2007

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2005

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2007

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2005

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2005

Phase Fund CST STP

Year LUMP

Federal $55,200
Federal $0
$692,000
Federal
$820,000
Federal $400,000 $2,432,000
Federal $0
$1,140,800
Federal $0
$680,000
Federal $96,000

State $13,800
State $0
$173,000
State
$205,000
State $100,000 $608,000
State $0
$285,200
State $0
$170,000
State $24,000

Other $0
Other $10,000
$0
Other
$0
Other $0 $0
Other $10,000
$0
Other $10,000
$0
Other $0

Total $69,000
Total $10.000 $865,000
Total
$1,025,000
Total $500,000 $3.040.000
Total $10,000 $1,426,000
Total $10.000 $850,000
Total $120,000

Page 229 of 300

STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM waDD5

Morgan

Project: 0002735 Type Work: Replace Bridge

Descp: CR 1161AQUA RD@ LITTLE INDIAN CREEK 5.7 MI

SO. OF MADISON

Length: 0.56

TlP#:

Project: 0006432 Type Work: Replace Bridge

Descp: CR 251/SEVEN ISLANDS RD @ BIG INDIAN CREEK

OVERFLOW

Length: 0040

TIP#:

Project: 0006433 Type Work: Replace Bridge Descp: CR 251/SEVEN ISLANDS RD @ BIG INDIAN CREEK

Length: 0040 TlP#:

Project: 222570. Type Work: Widening

Descp: SR 24IUS 441 FM THE PUTNAM CL TO N OF

PIERCE DAIRY RD/CR 121

Lanes: Exist. 2 Prop. 4

Length: 8.05

TIP#:

Project: 245400. Type Work: Replace Bridge

Descp: SR 83/BOSTWICK HWY @ LITTLE SANDY CRK 4.6

MI S OF BOSTWICK

Length: 0.57

TlP#:

Project: 245401- Type Work: Replace Bridge

Descp: SR 831B0STWICK HWY @ BIG SANDY CRK 3 MI

SO OF BOSTWICK

Length: 0.28

TlP#:

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2005

Phase PE ROW CST

Fund Bridge Local Bridge

Year 2005 LOCL After 2007

Phase PE ROW CST

Fund Bridge Local Bridge

Year 2005 LOCL After 2007

Phase Fund

PE State

PE

Bond

ROW Bond

ROW Bond

CST Bond

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2006 2007 After 2007 Year Underway 2006 2007

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 2007

Federal
$0 $814,400
Federal $28,000 $0

State
$0 $203,600
State $7,000 $0

Federal $36,800 $0

State $9,200 $0

Federal

State

$0 $0
Federal
$8.000 $792,000

$5,000,000 $6,797,000
State
$2,000 $198,000

Federal
$8.000 $840,000

State
$2,000 $210,000

Other $0 $0
Other $0
$50,000
Other $0
$50,000
Other
$0 $0 Other $0 $0
Other $0 $0

Total
$0
$1,018,000
Total $35,000
$50,000
Total
$46,000
$50,000
Total
$5,000,000
$6,797,000
Total $10,000 $990,000 Total $10,000
$1,050,000
Page 230 of 300

.'

STATE TRANSPORTATION IMPROVEMENT PROGRAM zmZOO5

Murray

Project: 0006616 Type Work: Historic Acquisition Descp: VAN HOUSE LAND ACQUISITION FOR HISTORIC
FEDERAL ROAD & TRAIL Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 621260- Type Work: New Construction

Descp: SR 282 RELOCATION FM SR 61/US 411 E TO CR

309

Lanes: Exist. 0 Prop. 2

Length: 1.20

TIP#:

Project: 631550- Type Work: New Construction

Descp: SR 225/SPRING PL BYP FM NEW HOPE RD TO SR

521US 76 -PHASE 1 Lanes: Exist. 0 Prop. 4

Length: 3.72

TlP#:

Project: 642410- Type Work: Replace Bridge

Descp: SR 282 @ ROCK CREEK 5.3 MI S OF

CHATSWORTH

Length: 0.22

TIP#:

Project: 871230- Type Work: Miscellaneous Improvement
Descp: RELOCATE CR 23; CONSTRUCT A CANOE/KAYAK RAMP & PARKING AREA Length: 0.23

LUMP SUM PROJECT

TIP#:

Phase Fund ROW STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase PE ROW CST

Fund STP STP STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase PE ROW CST

Fund STP STP STP

Year LUMP
Year Underway
2006 2007
Year Underway
2007 After 2007
Year Underway
2005 After 2007
Year Underway Underway
LUMP

Federal $600,000
Federal $472,800 $2,160,000 Federal $1,780,000
Federal $11,200
Federal
$172,000

State $0
State $118.200 $540,000 State $445.000
State $2,800
State $0

Other $150,000
Other $0 $0
Other $0
Other $0
Other
$43,000

Total $750,000
Total $591.000 $2.700.000 Total $2,225.000
Total $14,000
Total $215,000

Page 231 of 300

STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM zaJ2005

Muscogee
Project: 0000099 Type Work: Bicycle/Ped. Facility Descp: WARM SPRINGS RAIL LINE BIKE/PED TRAIL

LUMP SUM PROJECT

Length: 12.00 TIPII: DTR

Project: 0000342 Type Work: Widening

Descp: MACON RD/SR 22SP FM UNIVERSITY AVE/CS 959

TO REESE RD/CS2111

Length: 1.31

TlPII: 03-SR-2111

Project: 0001362 Type Work: Bridge Rehab

Descp: GENTIAN BLVD/CS 1781 @ LINDSEY CREEK JUST

EAST OF 1-185

Length: 0.20

TIPII: 00-SR-1362

Project: 0001607 Type Work: Intersection Improvement

Descp: SR 221US 80 AT BRADLEY PARK DRIVE/CS 1505 IN

COLUMBUS

Length: 0.46

LUMP SUM PROJECT

TlP#: Safe Lump

Project: 0001893 Type Work: Turn Lanes

Descp: SR 520 FROM 1-185/MUSCOGEE TO SR 26/MP

8.51/CHArrAHOOCHEE

Lanes: Exist. 4 Prop. 5

Length: 10.28

LUMP SUM PROJECT

TIP#: SafeLump

Project: 0002350 Type Work: Miscellaneous Improvement Descp: EAST BANK TO WEST BANK OF
CHATTAHOOCHEE RIVER Length: 0.00

LUMP SUM PROJECT

TIP#: Enhan

Project: 0002408 Type Work: Guardrail
Descp: LINDSAY CREEK PKWY FROM 1ST DIVISION RD/CHATT TO 1-185/MUSCG Length: 0.00

LUMP SUM PROJECT

TlP#: Safe Lump

Project: 0004729 Type Work: Replace Bridge

Descp: CS 2227/BROWN AVE. @ SOUTHERN RAILROAD

SW. COLUMBUS

Length: 0.25

TIP#: BR-4729

Project: 0006101 Type Work: Railroad Crossing Descp: CS 117218TH AVENUE @ NS #718961U

LUMP SUM PROJECT

Length: 0.20 TIP#:

Project: 0006446 Type Work: Widening

Descp: SR 1/US 27 FM TURNBERRY LN/MUSCOGEE TO

GATLIN LN/HARRIS

Lanes: Exist. 2 Prop. 4

Length: 6.26

TlP#: VET 2005

Project: 0006472 Type Work: New Construction

Descp: SCHATULGA RD/EASTERN CONN FRM RED

ARROW RD TO CHATHSWORTH RD

Lanes: Exist. 0 Prop. 2

Length: 1.16

TIP#: EAST2005

Phase Fund PE Local ROW Local CST STP

Phase Fund PE NHS ROW NHS CST NHS

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

STP

CST STP

Phase Fund CST STP

Phase Fund CST STP

Phase Fund CST STP

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Phase Fund CST STP

Phase Fund PE STP ROW STP CST STP
Phase Fund ROW Local CST STP

Year LOCL LOCL LUMP
Year Underway
2006 After 2007
Year Underway
2005 2006
Year Underway
LUMP
Year LUMP
Year LUMP
Year LUMP
Year 2005 LOCL After 2007
Year LUMP
Year 2007 After 2007 After 2007
Year LOCL 2005

Federal $0 $0
$1,000,000 Federal $416,000
Federal $16,000
$258,400 Federal $367,200
Federal $1,991,700
Federal $1,000,000
Federal $819,000
Federal $184,000
$0
Federal $170,000
Federal $4,000
Federal $0
$3.200,000

State $0 $0 $0
State $104,000
State $4,000
$64,600 State $40,800
State $221,300
State $0
State $91,000
State $46,000
$0
State $0
State $1,000
State $0 $0

Other $0 $0
$250,000 Other $0
Other $0 $0
Other $0
Other $0
Other $250,000
Other $0
Other $0
$20,000
Other $0
Other $0
Other $214,000 $800,000

Total
$0
$0 $1,250,000 Total $520,000
Total
$20,000 $323,000 Total $408,000 Total $2,213,000
Total $1.250,000
Total $910,000 Total $230,000
$20,000
Total
$170,000 Total $5,000
Total
$214,000
$4,000,000
Page 232of 300

..:'


STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Muscogee

Project: 0006597 Type Work: Streetscapes

Descp: VETERANS PARKWAY STREETSCAPE

IMPROVEMENTS

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006598 Type Work: Multi-use Trail

Descp: CHATTAHOOCHEE RIVERWALK BIBB MILL

CONNECTOR

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 311445. Type Work: Widening Descp: 1-185/COLUMBUS FM SR 520 TO ST MARYS ROAD

Lanes: Exist. 4 Prop. 6

Length: 2.83 TIP#: 91-ST-2003

Project: 311830. Type Work: Interchange Descp: 1-185 INTERCHANGE AT SR l/SR 520

Lanes: Exist, 2 Prop. 4

Length: 1.61 TIP#: 91-ST-~01

Project: 332820. Type Work: Widening

Descp: SR l/US 27 FM OLD MOON ROAD TO TURNBERRY

LANE Lanes: Exist. 2

Prop. 4

Length: 1.23

TIP#: 98-SR-01

Project: 350780. Type Work: Widening

Descp: FOREST RD FM MACON{+MACON IMPROV} TO

WOODRUFF FA/FLOYD RD

Lanes: Exist. 2 Prop. 4

Length: 2.14

TlP#: 79-SR-2003

Project: 350790. Type Work: Widening

Descp: ST MARYS RD/CS 2108/COLUMBUS FM BUENA

VISTA TO ROBIN DR

Lanes: Exist. 2 Prop. 4

Length: 0.91

TlP#: 79-SR-2020

Project: 350850 Type Work: Widening

Descp: SCHATULGA RD/EASTERN CONN. RD FM BUENA

VISTA RD TO MACON RD

Lanes: Exist. 2 Prop. 4

Length: 3.76

TlP#: 91-SR-2003

Project: 351000-

Type Work: Intersection Improvement

Descp: SR 22SP/MACON RDIWYNNTON AT BROWN

AVENUE AND PEACOCK AVENUE Length: 0.20

LUMP SUM PROJECT

TlP#: 79-SR-2004

Project: M002989 Type Work: Guardrail

Descp: 1-185 FM CS 22491WILlIAMS RD/MUSCOGEE TO

SR 1rrROUP

Length: 30.32

LUMP SUM PROJECT

TlP#:

project: TOO0855 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR COLUMBUS

Length: 0.00 TIP#:

Phase Fund CST STP

Year LUMP

Federal $1,000,000

State $0

Other $250,000

Phase Fund CST STP

Year LUMP

Federal $1,000,000

State $0

Other $250,000

Phase Fund

PE

NHS

ROW NHS

CST Bond

Year Underway
2005 2006

Federal

State

$320,000 $0

$80,000 $16,214,000

Other
$0 $0

Phase PE ROW CST

Fund 1M 1M Bond

Year Underway
2005 2006

Federal
$1,806,300 $0

State
$200,700 $8,245,000

Other
$0 $0

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2006

Federal
$2,544,000 $2,634,400

State
$636,000 $658,600

Other
$0 $0

Phase Fund

PE

STP

ROW STP

ROW STP

CST STP

CST STP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway Underway
2007 After 2007 After 2007
Year Underway
LOCL 2006

Federal
$11,680,000
Federal $0
$3,849,600

State
$2,920,000
State $0
$962,400

Other
$0
Other $0 $0

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL 2007

Federal
$0 $15,816,000

State

Other

$0

$214,000

$0 $3,954,000

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Federal
$0 $528,300

State
$0 $58,700

Other
$0 $0

Phase Fund

PE

1M

CST 1M

Year LUMP LUMP

Federal $1,800,000 $43,200,000

State $200,000 $4,800,000

Other $0 $0

Phase Fund CST Transit

Year 2005

Federal $889,568

State $111,196

Other $111,196

Total $1,250,000
Total $1,250,000
Total $400,000 $16,214,000
Total $2,007,000 $8,245,000
Total $3,180,000 $3,293,000
Total
$14,600,000
Total $0
$4,812,000
Total $214,000 $19,770,000
Total $0
$587,000
Total $2,000,000 $48,000,000
Total $1,111,960

Page 233 of 300

STATE TRANSPOR TATJON IMPROVEMENT PROGRAM
2t7I2QQ5

Muscogee
Project: T000656 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T000657 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T000919 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T000920 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T000921 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T001235 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:
Project: T001236 Type Work: Transit Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR COLUMBUS
Length: 0.00 TIP#:
Project: T001237 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR COLUMBUS
Length: 0.00 TlP#:

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Phase Fund CST Transit

Year 2007

Federal $800,000

State $100,000

Federal $59,490

State $14.873

Federal $1,017,292

State $127,162

Federal $0

State $0

Federal $62,465

State $15.616

Federal $1,377.847

State $172,231

Federal $0

State $0

Federal $65.588

State $16,397

Other $100,000
Other $0
Other $127,162
Other $0
Other $0
Other $172.231
Other $0
Other $0

Total
$1.000.000
Total
$74.363
Total
$1.271,615
Total $0
Total
$78.081 Total $1,722,309
Total
$0
Total
$81,985
Page 234 of 300

.'

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM Za12005

Newton
Project: 0000842 Type Work: Intersection Improvement Descp: SR 1621SALEM ROAD AT CR 33/SPRING ROAD

LUMP SUM PROJECT

Length: 0.32 TIP#:

Project: 0004146 Type Work: Intersection Improvement

Descp: SR 81 AT CR 309/653 & SR 162 CONNECTOR; CR

574 PORTERDALE

Length: 0.53

LUMP SUM PROJECT

TlP#:

Project: 0004444 Type Work: Guardrail

Descp: SR 212 OVER LAKE JACKSON GUARDRAIL AT

APPROACHES

Length: 0040

LUMP SUM PROJECT

TlP#:

Project: 0004709 Type Work: Bicycle/Ped. Facility

Descp: YELLOW RIVER/BROWN'S BRIDGE ROAD

MULTI-USE TRAIL

Length: 5.00

LUMP SUM PROJECT

TlP#:

Project: 0006022 Type Work: New Construction

Descp: SR 11/1-20 RELOCATE CLOSE FRONTAGE RD-

RIVER RD EXTENSION Lanes: Exist. 0 Prop. 2

Length: 0.20

TlP#:

Project: 0006648 Type Work: Sidewalks Descp: PACE & ELM STREET SIDEWALK

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006649 Type Work: Historic Facilities Descp: HISTORIC TRAIN DEPOT-PORTERDALE'S TRAIL&
RIVERSIDE COMMUNITY Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 210530 Type Work: Interchange Descp: 1-20@ SR 142-121COVINGTON (INCL RELOC OF
FRONTAGE RD/CR 72) Length: 0.71
TIP#: NE-AR-OOIA

Project: 210810- Type Work: Widening

Descp: 1-20FM ALCOVY ROAD INCL INTERCHANGE TO

SR 142 IN COVINGTON Lanes: Exist. 4 Prop. 6

Length: 2.73

TlP#: NE-AR-002A

Project: 231210- Type Work: Widening

Descp: SR 1621SALEM RD FM BROWN BR RD/NEWTN TO

S/FLAT SHOALSIRCKDLE

Lanes: Exist. 2 Prop. 6

Length: 3.72

TIP#: NE-004

Project: 231220 Type Work: Widening

Descp: SR 142 FM S OF SR 121US 278 NORTH TO N OF CR

75 IN COVINGTON Lanes: Exist. 2 Prop. 4

Length: 1.07

TIP#:

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL LUMP

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL LUMP

Phase PE ROW CST

Fund STP STP STP

Year Underway
LUMP LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year 2007 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase PE ROW CST

Fund 1M NHS Bond

Year Underway
2005 2006

Phase PE ROW CST

Fund NHS NHS Bond

Year Underway
2005 2006

Phase PE ROW CST

Fund STP STP STP

Year 2005 After 2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
2005 After 2007

Federal $0
$360,000
Federal $0
$630,858
Federal $129,600 $122,400
Federal $350,000

State $0
$40,000
State $0
$70,095
State $14,400 $13,600
State $0

Federal $12,000

State $3,000

Federal $292,000

State $0

Federal $278,400

State $0

Federal
$5,250,400 $0

State
$1,312,600 $9,550,000

Federal

State

$4,903,200 $0

$1,225,800 $24,583,000

Federal $1,840,000

State $460,000

Federal $480,000

State $120,000

Other $25,000
$0 Other $476,000
$0 Other
$0 $0 Other $87,500
Other $0
Other $73,000
Other $69,600
Other $0 $0
Other $0 $0
Other $0
Other $0

Total $25,000 $400,000 Total $476,000 $700,953 Total $144,000 $136,000 Total $437,500
Total $15,000
Total $365,000
Total $348,000
Total $6,563,000 $9,550,000
Total $6,129,000 $24,583,000
Total $2,300,000
Total $600,000

Page 235 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 20/2005

Newton

Project: 231630- Type Work: Widening

Descp: SR 121US 278 FM COVINGTON BYPASS/CR 653

EAST TO SR 142 Lanes: Exisl. 2 Prop. 4

Length: 3.45

TIP#: NE-007

Project: 232330. Type Work: Intersection Improvement
Descp: SR 36 AT FLAT SHOALS/STEELE RD/CR 181 & HENDERSON MILLlCR508 Length: 0.80

LUMP SUM PROJECT

TIP#:

Project: 242230- Type Work: Widening Descp: SR 142 FM 1-20TO ALCOVY RD IN COVINGTON

Lanes: Exist. 2 Prop. 4

Length: 1.70 TIP#:

Project: 245190. Type Work: Intersection Improvement

Descp: SR 212 FROM BETHANY ROAD TO OAK HILL

ROAD

Length: 2.11

TlP#: NE-OII

Project: 245380. Type Work: Replace Bridge Descp: SR 20 @ SOUTH RIVER NEWTON-HENRY CO LINE

Length: 0.61
TlP#: NE-OI2
Project: 333172- Type Work: Replace Bridge Descp: SR 36@ SOUTH RIVER AT BUTTS-NEWTON CO
LINE Length: 0.40
TIP#:

Phase Fund PE STP ROW STP CST STP

Year Underway
2005 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase Fund PE STP ROW STP CST STP

Year Underway
2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
2005 2007

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway
2005

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 After 2007

Federal $240,000
Federal $0
$1.242,900 Federal
$2,343,200
Federal $696,000 $1,844,000 Federal
$1,785,600 Federal $12,000

State $60,000
State $50,000 $138,100 State $585,800
State $174,000 $461,000 State
$446,400 State
$3,000

Other $0
Other $300,000
$0 Other
$0
Other $0 $0
Other
$0 Other
$0

Total
$300,000 Total
$350,000 $1,381.000 Total $2,929,000 Total $870,000 $2,305.000 Total $2.232,000 Total
$15,000
Page 236 of 300

.'

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 217/2005

Oconee
Project: 0002351 Type Work: Streetscapes Descp: WATKINSVILLE DOWNTOWN STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 142060. Type Work: Widening

Descp: SR 53 & MARS HILL RDICR 264 FM SR 15 TO SR

316 & OCONEE CONN

Lanes: Exist. 2 Prop. 4

Length: 3.57

TIP#: R-14

Project: 171460. Type Work: Bicycle/Ped. Facility

Descp: SIMONTON BRIDGE ROAD FM WATKINSVILLE TO

CLARKE COUNTY

Length: 2.50

LUMP SUM PROJECT

TIP#: VOl

Project: 171574. Type Work: Sidewalks

Descp: STREETSCAPES FOR BUTLER'S CROSSING IN

WATKINSVILLE

Length: 4.90

LUMP SUM PROJECT

TIP#: v-os

Project: T001115 Type Work: RR Corridors Descp: Athens to Atlanta Passenger Rall- Phase II

Length: 0.00 TIP#:

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year LUMP LOCL LUMP

Phase Fund CST HPP

Year 2005

Federal $2,777,600

State $694,400

Federal $0 $0
$315,200

State $0 $0 $0

Federal $18,400 $0
$181,600

State $0 $0 $0

Federal $5,702,000

State $1,425,500

Other $125,000
Other $0
Other $0 $0
$78,800
Other $4,600
$0 $45,400
Other $0

Total $625,000
Total $3,472,000
Total $0 $0
$394,000
Total $23,000
$0 $227,000
Total $7,127,500

Page 237 of 300

STATE TRANSPORTA TJON IMPROVEMENT PROGRAM
2flI2QQ5

Oglethorpe

Project: 0001221 Type Work: Bridge Rehab

Descp: SR 101 US 78 OVER MOSS CREEK 1.4 MI W OF

ARNOLDSVILLE Lanes: Exist. 2 Prop. 4

Length: 0.20

TlP#:

Project: 132660. Type Work: Widening

Descp: SR 10lUS 78 FM WHIT DAVIS RD/CR 166 TO

SMOKEY/CR 26/& OGLETH

Lanes: Exist. 2 Prop. 4

Length: 11.48

TJP#: R-41

Project: 222460- Type Work: Passing Lanes

Descp: SR 10: OGLETHORPE MP13.7-15;15.3-16.2&

WILKES: 0-1.5;5.5-7.0 Lanes: Exist. 2 Prop. 3

Lenglh: 5.70

TJP#:

Project: 231910- Type Work: New Construction

Descp: CRAWFORD/LEXINGTON BYP FM E OF CR

116/SMOKEYRD SE TO SR 22

Lanes: Exist. 0 Prop. 4

Length: 7.10

TIP#:

Project: 245372. Type Work: Replace Bridge Descp: SR 22 @ SOUTH FORK BROAD RIVER 4 MI NE OF
SMITHSONIA Length: 0.38
TJP#:

Phase Fund

PE

Bridge

CST Bridge

Year Underway
2006

Federal $66,400

State $16,600

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Federal $5,656,800

State $1,414,200

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 2007

Federal
$72,000 $4,812,800

State
$18,000 $1,203,200

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Federal $1,755,200

State $438,800

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 2007

Federal
$8,000 $1.292,800

State
$2,000 $323,200

Other $0
Other $0
Other $0 $0
Other $0
Other $0 $0

Total $83,000 Total $7,071,000 Total $90,000 $6,016,000 Total $2,194,000 Total $10,000 $1,616.000
Page 238 of 300





STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005

Paulding

Project: 0002120 Type Work: Bicycle/Ped. Facility

Descp: SILVER COMET TRAIL APPROACHES TO THE US

278 TUNNEL

Length: 0.80

TlP#: PA AR BPOO

Project: 0002121 Type Work: Bicycle/Ped. Facility

Descp: WINNDALE ROAD SPUR TO THE SILVER COMET

TRAIL

Length: 0.21

TlP#: PA AR BPOO

Project: 0004208 Type Work: Sidewalks Descp: DAlLAS CONNECTING SIDEWALKS

Length: lAO TlP#: PA-AR-BPOO
Project: 0004688 Type Work: New Construction Descp: EAST HIRAM PARKWAY FM SR 92 TO US 278

Lanes: Exist. 0 Prop. 4

Length: 2.70 TlP#: PA-OI6

Project: 0005830 Type Work: Intersection Improvement Descp: SR 92 AT CEDARCREST RD AND AT DALLAS
ACWORTH HIGHWAY/CR 473 Length: 0040
TlP#:

Project: 0006049 Type Work: Widening

Descp: SR 360 FM SR 176/NEW MACLAND ROAD TO SR

120IPAULDING COUNTY

Lanes: Exist. 2 Prop. 4

Length: 5.80

TlP#: CO-367

Project: 0006589 Type Work: Streetscapes Descp: DOWNTOWN DALLAS STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 0006590 Type Work: Welcome center facilities Descp: PAULDING COUNTY CHAMBER OF COMMERCE
WELCOME CENTER RESTROOM Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006755 Type Work: Special Studies Descp: SR 6/CAMP CREEK PKWY FM 1-85 TO W HIRAM
PKWY- CORRIDOR STUDY Length: 29.07
TlP#: AR-465

Project: 0006858 Type Work: Multi-use Trail

Descp: WILLIAMS LAKE ROAD TRAIL CONNECTION TO

SCHOOLS & PARK

Length: 0.00

TlP#: PA-AR-BPOO

Project: 0006928 Type Work: Intersection Improvement Descp: SR 92 @ CR 466/DUE WEST ROAD

Length: 0040 TlP#: PA-092D2

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

Local

ROW Local

CST CMAQ

Year LOCL LOCL 2005

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year Underway
2006 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year 2006

Phase Fund CST CMAQ

Year 2007

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL 2007

Federal $0 $0
$120,000

State $0 $0 $0

Federal $0 $0
$37,600

State $0 $0 $0

Federal $0 $0
$700,000

State $0 $0 $0

Federal

State

$0

$2,475,000

$0 $11,015,000

Federal $104,000

State $26,000

Federal $1,440,000

State $360,000

Federal $500,000

State $0

Federal $50,400

State $0

Federal $600,000

State $0

Federal $280,000

State $0

Federal $0 $0
$240,000

State $0 $0 $0

Other $0 $0
$30,000
Other $0 $0
$9,400
Other $175,000 $125,000 $175,000
Other $0 $0
Other $0
Other $0
Other $125,000
Other $12,600
Other $150,000
Other $70,000
Other $80,000 $40,000 $60,000

Total $0 $0
$150,000
Total $0 $0
$47,000
Total $175,000 $125,000 $875,000
Total $2,475,000 $11,015,000
Total $130,000
Total $1,800,000
Total $625,000
Total $63,000
Total $750,000
Total $350,000
Total $80,000 $40,000 $300,000

Page 239 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zmZ005

Paulding
Project: 621570- Type Work: Widening Descp: SR 61 FM SR 120 CONN TO SR 6/DALLAS BYPASS

Lanes: Exist. 2 Prop. 4

Length: 4.10 TlP#: PA06ICI

Project: 621720- Type Work: Widening

Descp: SR 92 FM NEBO RD S/HIRAM TO SR 120 INCL

POWDER SPINGS CK;BRD

Lanes: Exist. 2 Prop. 4

Length: 4.45

TIP#: PA092BI

Project: 632920- Type Work: Replace Bridge Descp: SR 120@SILVERCOMET 1.1 MI SW OF DALLAS

Length: 0.10 TlP#: PA-026
Project: 632921- Type Work: Replace Bridge Descp: SR 92@ CR 511- SOU RR (719809H) IN HIRAM

Length: 0.24 TlP#: PA-027
Project: 641830- Type Work: Widenirig Descp: SR 61 BRIDGE OVER SILVER COMET TRAIL

Lanes: Exist. 2 Prop. 4 LUMP SUM PROJECT

Length: 0.03 TIP#: PA-OI7A

Project: 670366. Type Work: Replace Bridge Descp: CR 84210LD HARRIS ROAD @ SOUTHERN RR
(719808G) SE OF DALLAS Length: 0.23
TlP#: PA-025

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year Underway
2006 After 2007

Federal $4.550,400

State $1,049,600

Phase PE ROW CST

Fund STP STP STP

Year Underway
2006 After 2007

Federal $16,901,600

State $4,225,400

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 2006

Federal
$8,000 $425,600

State
$2,000 $106,400

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 After 2007

Federal $10,400

State $2,600

Phase Fund

PE

Bridge

CST Bridge

CST STP

Year Underway After 2007
LUMP

Federal $1,125,000

State $125,000

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2005

Federal
$0 $650,977

State
$0 $162,744

Other $0
Other $0
Other $0 $0
Other $0
Other
$0 Other $300,000 $203,430

Total
$5,600,000
Total $21,127,000
Total
$10,000
$532,000
Total
$13,000 Total $1,250,000
Total
$300,000
$1.017.151 Page 240 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 217!2QQ5

Peach

Project: 0000951 Type Work: Replace Bridge

Descp: CR 49/0LD MACON ROAD OVER NORFOLK

SOUTHERN RAILROAD Lanes: Exist. 0 Prop. 2

Length: 0.16

TIP#:

Project: 0003623 Type Work: Miscellaneous Improvement Descp: SR 49 FROM SR 96 TO CS 632 - DRAINAGE
STRUCTURES/FORT VALLEY Length: 0.72
TIP#:

Project: 0004206 Type Work: Intersection Improvement
Descp: SR 49 AT CR 145/CHAPMAN; OLD MACON; INDUSTRIAL & WOODLAND Length: 0.52

LUMP SUM PROJECT

TIP#:

Project: 0006117 Type Work: Railroad Crossing Descp: CS 643/GREEN STREET @ NS #734052V

LUMP SUM PROJECT

Length: 0.20 TIP#:

Project: 0006454 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN

PEACH COUNTY

Length: 0.00

LUMP SUM PROJECT

T1P#:

Phase Fund PE State ROW Local CST State

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund

PE

STP

ROW Local

CST STP

Phase Fund CST STP

Phase Fund

PE

STP

CST STP

Year 2005 LOCL After 2007
Year Underway
2005 2007
Year Underway
LOCL LUMP
Year LUMP
Year Underway
LUMP

Federal $0 $0
Federal $632,000 $1,208,800
Federal $0
$414,000
Federal $135,000
Federal $176,000

State $100,000
$0
State $158,000 $302,200
State $0
$46,000
State $0
State $44,000

Other $0
$100,000
Other $0 $0
Other $487,500
$0
Other $0
Other $0

Total $100,000 $100,000
Total $790,000 $1,511,000
Total $487,500 $460,000
Total $135,000
Total $220,000

Page 241 of 300

STATE TRANSPORTA nON IMPROVEMENT PROGRAM 2/7/2005

Pickens

Project: 0008418 Type Work: Roadway Project

Descp: SR 53 FM CR 271/CARTER MOUNTAIN RD TO CR

178IDAVIS RD

Length: 2.40

LUMP SUM PROJECT

TIP#:

Project: 0008585 Type Work: Streetscapes Descp: NELSON PEDESTRIAN ENHANCEMENTS

LUMP SUM PROJECT

Length: 0.00 TlP#:

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase Fund CST STP

Year LUMP

Federal
$315,000 $2.430,000
Federal $400,000

State
$35,000 $270,000
State $0

Other
$0
$0 Other
$100,000

Total
$350,000 $2.700.000
Total $500,000

Page242of300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 2012005

Pierce
Project: 0001937 Type Work: Railroad Crossing Oescp: CR 218/SANDY BOTTOMS ROAD @ CSX #638163A

LUMP SUM PROJECT

Length: 0.20 TlP#:

Project: 0003087 Type Work: Replace Bridge

Oescp: SR 15@ FISHING CREEK 2 MILES NORTH OF

BRISTOL

Length: 0.50

TlP#:

Project: 0003782 Type Work: Intersection Improvement Oescp: SR 38 AT CR 178IHACKELBARNEY ROAD

LUMP SUM PROJECT

Length: 0.32 TIP#:

Project: 533170- Type Work: Replace Bridge Oescp: SR 15@ BIG SATILLA CREEK & OfF AT
PIERCE/APPLING COUNTY LN Length: 1.39
TlP#:

Phase Fund CST STP

Year LUMP

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 2007

Phase Fund PE STP CST STP

Year Underway
LUMP

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Federal $145,000
Federal $35,200
$2,162,400 Federal $287,100
Federal
$3,533,600

State $0
State $8,800
$540,600 State $31,900
State
$883,400

Other $0
Other $0 $0
Other $0
Other
$0

Total $145,000
Total $44,000 $2,703,000 Total $319,000
Total
$4,417,000

Page 243 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM
2!7I2QQ5

Pike

Project: 0006599 Type Work: Streetscapes
Descp: ZEBULON REVITALIZATION COURTHOUSE COMMERCIAL DIST - PHASE I Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006600 Type Work: Multi-use Trail Descp: MOLENA WALKING TRAIL PROJECT

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 333110.

Type Work: Intersection Improvement

Descp: SR 18/SR 109 AND SR 74 INTERSECTION

IMPROVEMENT

Length: 0.20

TlP#:

Project: 333145- Type Work: Replace Bridge Descp: SR 18@ ELKINS CREEK .1 MI W OF ZEBULON

Length: 0.38 TlP#:

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2006

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2006

Federal $410,400
Federal $124,800
Federal $216,000 $538,400 Federal
$1,223,200

State $0
State $0
State $54,000 $134,600 State
$305,800

Other
$102,600

Total $513,000

Other
$31,200

Total $156,000

Other
$0
$0
Other

Total $270,000 $673,000
Total

$0

$1,529,000

Page 244 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2!7/2QQ5

Polk
Project: 0006626 Type Work: Streetscapes Descp: CEDARTOWN MAIN STREET STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 T1P#:

Project: 0006627 Type Work: Streetscapes

Descp: ROCKMART STREETSCAPE ENHANCEMENT

PROJECT - PHASE II

Length: 0.00

LUMP SUM PROJECT

T1P#:

Project: 621860- Type Work: Widening

Descp: CEDARTOWN BYPASS/US 27 FM SR 100 N TO

JUST S. OF CR 334 Lanes: Exist. 2 Prop. 4

Length: 5.71

TfP#:

Project: 670678- Type Work: Repiace Bridge

Descp: CR 1821BETHLEHEM ROAD @ FISH CREEK 5.7 MI

W OF ROCKMART

Length: 0.25

T1P#:

Phase Fund CST STP

Year LUMP

Federal $500,000

State $0

Phase Fund CST STP

Year LUMP

Federal $224,800

State $0

Phase Fund

PE

State

PE

Bond

ROW Bond

CST Bond

Phase Fund

PE

Bridge

ROW Local

CST Bridge

CST STP

Year Underway Underway Underway
2005
Year Underway
LOCL 2006 2006

Federal

State

$0 Federal

$25,325,000 State

$0 $395,200 $395,200

$0 $98,800 $98,800

Other $125,000
Other $56,200
Other
$0 Other $10,000
$0 $0

Total $625,000
Total $281,000
Total
$25,325,000 Total $10,000 $494,000 $494,000

Page 245 of 300

STA TE TRANSPORTATION IMPROVEMENT PROGRAM 2m2005

Pulaski

Project: 0005533 Type Work: Replace Bridge

Descp: SR 11 @ BLUFF CREEK 4.7 MILES E OF

FINLEYSON

Lenglh: 0.20

TlP#:

Project: 0005548 Type Work: Replace Bridge

Descp: SR 11 @BIGTUCASAWATCHEE CREEK 3.7 MILES

S OF HAWKINSVILLE

Length: 0.20

TIP#:

Project: 333080. Type Work: Replace Bridge Descp: SR 257 @ TEN MILE CREEK 3.5 MI NW OF
FINLEYSON Length: 0.57
TlP#:

Project: 343000.

Type Work: Replace Bridge

Descp: SR 230 @ BIG CREEK 5.6 MILES WEST OF

HAWKINSVILLE

Lenglh: 0.58

TlP#:

Phase Fund PE Bridge ROW Bridge CST Bridge

Year 2005 After 2007 After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year 2005 After 2007 After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 After 2007

Federal $62,400

State $15,600

Federal $63,200

State $15,800

Federal $20,000

State $5,000

Federal $248,800

State $62,200

Other
$0

Total $78,000

Other
$0

Total $79.000

Other
$0

Total $25,000

Other $0

Total $311,000

Page246of300



STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 2J7I2QQ5

Putnam

Project: 0001077 Type Work: Intersection Improvement Descp: SR 16 FM JEFFERSON AVE TO EAST OF ROOTY
CREEK IN EATONTON Length: 0.90

LUMP SUM PROJECT

TIP#:

Project: 0003267 Type Work: Replace Bridge

Descp: CR 69/PARKS ROAD @ ROOTY CREEK 3.5 MI SE

OF EATONTON

Length: 0.30

TIP#:

Project: 0006252 Type Worle Widening

Descp: SR 44 FM WEST US 441 BYPASS TO CR

54/L1NGER LONGER RD

Lanes: Exist. 2 Prop. 4

Length: 15.00

TlP#:

Project: 222470- Type Work: Widening

Descp: SR 24/US 441 FM CR 245 TO EATONTON BYPASS

@US 129 Lanes: EXist. 2 Prop. 4

Length: 6.30

TIP#:

Project: 222560- Type Work: Widening

Descp: SR 24IUS 441 FM EATONTON BP @S/SHERWOOD

AVE TO MORGAN CL Lanes: Exist. 2 Prop. 4

Length: 9.19

TlP#:

Project: 231270- Type Work: Replace Bridge

Descp: SR 16 OVER THE OCONEE RIVER @ HANCOCK

COUNTY LINE

Length: 1.00

TIP#:

Project: 231620- Type Work: Widening

Descp: SR 44 FM MATHIS ROAD/JONES TO US

441IPUTNAM Lanes: Exist. 2 Prop. 3

Length: 10.73

TlP#:

Project: 232295- Type Work: Replace Bridge Descp: SR 16@ ROOTY CREEK IN EAST EATONTON

Length: 0.25 TIP#:

Project: 245350- Type Work: Replace Bridge Descp: SR 16@ CROOKED CREEK 6 MI E OF EATONTON

Length: 0.37 TlP#:

Phase Fund PE STP ROW STP CST STP

Year Underway Underway
LUMP

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2006

Phase Fund PE STP ROW STP CST STP

Year 2007 After 2007 After 2007

Phase Fund

PE State

PE

Bond

ROW Bond

CST Bond

Phase Fund

PE State

PE

Bond

ROW Bond

ROW Bond

CST Bond

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005 2007
Year Underway Underway
2006 2007 After 2007 Year Underway Underway 2005

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2006

Federal

State

$1,000,600
Federal $0
$600,000
Federal $3,692,000

$111,200
State $0
$200,000
State $923,000

Federal

State

$0 $0
Federal

$3,111,000 $26,442,000
State

$0 $0
Federal

$5,436,000 $6,000,000
State

$4,156,600

$1,039,200

Federal $4,992,600

State $1,246,200

Federal

State

$1,240,000 Federal

$310,000 State

$1,400,600

$350,200

Other

Total

$0
Other $10,000
$0
Other $0

$1,112,000
Total $10,000 $1,000,000
Total $4,615,000

Other

Total

$0 $0
Other

$3,111,000 $26,442,000
Total

$0 $0
Other

$5,436,000 $6,000,000
Total

$0 Other
$0

$5,196,000 Total
$6,241,000

Other

Total

$0 Other

$1,550,000 Total

$0

$1,751,000

Page 247 of 300

STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 21712005

Quitman

Project: 470950. Type Work: Replace Bridge

Descp: CR 84 @ PATAULA CREEK OVERFLOW 2.5 MI N

OF MORRIS

Lenglh: 0.22

TlP#:

Project: T001286 Type Work: Transit Projects Descp: Regional Transit for Quitman, Clay, Randolph &
Stewart Count Length: 0.00
TIP#:

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2007

Phase Fund CST Transit

Year 2005

Federal
$0 $420,800
Federal $491,330

State
$0 $105,200
State $0

Other
$0
$0
Other $98,266

Total
$0 $526,000
Total $589,596

Page 248 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2t7I2QQ5

Rabun
Project: 0000306 Type Work: Replace Bridge Descp: SR 28 @ NORTH FORK CHATTOOGA RIVER 13 MI
NE OF CLAYTON Length: 0.24
TIP#:

Project: 0005386 Type Work: Miscellaneous Improvement
Descp: SR 246 GAiSR 106 N CAROLINA ADVANCED TRUCK WARNING SYSTEM Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006322 Type Work: Replace Bridge

Descp: SR 2/US 76 OVER THE CHATTOOGA RIVER @ SC

LINE

Length: 0.20

TIP#:

Project: 122090. Type Work: Widening

Descp: SR 15IUS 441 FM NORTH CUCLAYTON TO NORTH

CAROLINA LINE Lanes: Ex/st. 2 Prop. 4

Lenglh: 7040

TIP#:

Project: 171580- Type Work: Replace Bridge Descp: LOW GAP ROADICR 80 AT TALLULAH RIVER 6.6 MI

SWOFTIGER Lanes: Ex/sl. 1 Prop. 2

Length: 0.10

TlP#:

Project: M002587 Type Work: Bridges

Descp: SR 15/US 441 @ BETTY CREEK BRIDGE

MAINTENANCE REHAB

Length: 0040

LUMP SUM PROJECT

TlP#:

Project: M002788 Type Work: Resurface & Maintenance Descp: SR 2 AT 1 LOC & SR 15 AT 2 LOCS IN RABUN
DECK REPLACEMENT Length: 1.20

LUMP SUM PROJECT

TlP#:

Phase Fund PE Bridge ROW STP CST Bridge CST STP
Phase Fund PE STP CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

Slate

PE

Bond

ROW Bond

ROW Bond

ROW Bond

CST E99

CST State

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Phase Fund

PE

NHS

CST NHS

Phase Fund PE STP CST STP

Year Underway
2006 2007 2007
Year Underway
LUMP
Year 2005 2005 2005
Year Underway Underway
2007 After 2007 After 2007 Underway After 2007
Year Underway
LOCL 2005
Year LUMP LUMP
Year LUMP LUMP

Federal
$22,400 $500,000 $500,000 Federal
$675,000

State
$5,600 $125,000 $125,000 State
$75,000

Federal $200,000
$40,000 $2,000,000
Federal

State $50,000 $10,000 $500,000
State

$0 $15,900,000

Federal
$0 $844,000
Federal $60,000
$400,000

State
$0 $211,000
State $15,000 $100,000

Federal $80,000
$800,000

State $20,000 $200,000

Other
$0 $0 $0 Other
$0

Total
$28,000 $625,000 $625,000 Total
$750,000

Other $0 $0 $0
Other

Total $250,000
$50,000 $2,500,000
Total

$0

$15,900,000

Other
$10,000 $0
Other $0 $0

Total
$10,000 $1,055,000
Total $75,000 $500,000

Other $0 $0

Total $100,000 $1,000,000

Page 249 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2al2QQ5

Randolph

Project: 0006527 Type Work: Water Pollution Mitig. Descp: 3 PARCELS TO MITIGATE PI#422115 &
422220/EARLY & 422230/CLAY Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006546 Type Work: RR Facilities Descp: SHELLMAN RAILROAD DEPOT

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 422230- Type Work: Widening

Descp: SR l/US27FM BLUFFTON BYP TO CARNEGIE VILU

RD/CR 153/RANDOLPH Lanes: Exist. 2 Prop. 4

Length: 6.86

TlP#:

Project: 422235. Type Work: Widening

Descp: SR 1/US 27 FM CARNEGIE VILULAH RD/CR 153 TO

CUTHBERT BYPASS Lanes: Exist. 2 Prop. 4

Length: 8.60

TlP#:

Project: 432095. Type Work: Replace Bridge

Descp: SR 50lUS 82 @ PACHITLA CREEK 4 MI E OF

CUTHBERT

Length: 0.30

TIP#:

Project: 442955. Type Work: Replace Bridge Descp: SR 216 @ CARTER CREEK 4.6 MI S OF CUTHBERT

Length: 0.51 TlP#:

Project: 442956. Type Work: Replace Bridge

Descp: SR 266 @ GEORGIA SOUTHWESTERN RAILROAD

2 MI W OF CUTHBERT

Length: 0.40

TlP#:

Project: T001286 Type Work: Transit Projects

Descp: Regional Transit for Quitman, Clay, Randolph &

Stewart Count

Lenglh: 0.00

TlP#:

Phase Fund ROW STP

Year LUMP

Federal $1.600.000

State $400.000

Phase Fund CST STP

Year LUMP

Federal $148,800

State $0

Phase Fund

PE

State

PE State

ROW RRBS

CST RRBS

Phase Fund

PE

State

PE

State

ROW RRBS

CST State

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2006 2007
Year Underway Underway
2006 After 2007
Year Underway Underway
2005

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund CST Transit

Year Underway
2005 2007 2007
Year 2005

Federal

State

$0 $0
Federal

$5.769.000 $16,025,000
State

$0 $5,451.000

Federal

State

$1.496.800
Federal
$11.200 $1.430,400
Federal
$40,000 $660.800 $378,400 Federal $491,330

$374.200
State
$2.800 $357.600
State
$10.000 $165.200
$94.600 State
$0

Other $0
Other $37.200
Other
$0 $0 Other
$0
Other
$0 Other
$0 $0
Other $0 $0 $0
Other $98.266

Total
$2,000.000
Total $186.000 Total
$5.769.000
$16,025.000
Total
$5,451.000
Total
$1.871.000 Total
$14.000
$1.788.000
Total $50.000 $826.000
$473.000
Total
$589.596
Page 250 of 300

.'

STATE TRANSPORTATION IMPROVEMENT PROGRAM
zrraoos

Richmond

Project: 0001794 Type Work: Widening

Descp: ALEXANDER DRIVE/CR 560 FM WASHINGTON RD

TO RIVERWATCH PKWY

Lanes: Exist. 2 Prop. 4

Length: 0.87

T1P#: STP-18

Project: 0001795 Type Work: Miscellaneous Improvement Descp: 1-20JUST EAST OF DAVIS ROAD - DRAINAGE
IMPRVS @ CRANE CREEK Length: 0.74
T1P#: IM-3

Project: 0002383 Type Work: Landscaping

Descp: LANDSCAPE GATEWAYS TO GEORGIA ON 1-20IN

RICHMOND CO.

Length: 1.00

LUMP SUM PROJECT

T1P#: TEA

Project: 0003790 Type Work: Intersection Improvement

Descp: SR 4/15TH STREET AT CR 2207/CENTRAL AVENUE

IN AUGUSTA

Length: 010

LUMP SUM PROJECT

T1P#: NHS LUMP S

Project: 0005925 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCATIONS ALONG SR 28 Length: 0.00

LUMP SUM PROJECT

T1P#: STP LUMP

Project: 0005934 Type Work: Railroad Crossing Descp: CR 479/ARTHERN ROAD @ CSX # 633711T

LUMP SUM PROJECT

Length: 0.20 T1P#: MSL

Project: 0006314 Type Work: Water Pollution Milig.

Descp: 8.45 WETLAND CREDITS TO MITIGATE PI# 250510-

RICHMOND COUNTY

Length: 0.00

LUMP SUM PROJECT

T1P#:

Project: 0006639 Type Work: Multi-use Trail Descp: AUGUSTA CANAL MULTI-USE TRAIL - PHASE III

LUMP SUM PROJECT

Length: 0.00 T1P#:

Project: 0006694 Type Work: Rail Projects Descp: AUGUSTA RAIL RELOCATION PROJECT

Length: 0.00 T1P#:

Project: 210450- Type Work: Interchange Descp: 1-20AT 1-520 INTERCHANGE RECONSTRUCTION

Length: 1.90 TIP#: NHS-2

Project: 210570- Type Work: Widening

Descp: 1-20FM BELAIR RD/COLUMBIA CO TO

RIVERWATCH PARKWAY/RICHMOND

Lanes: Exist. 4 Prop. 6

Length: 5.01

T1P#: NHS-6

Phase Fund PE Local PE STP ROW Local CST STP

Phase PE ROW CST

Fund 1M 1M 1M

Phase Fund CST STP

Phase Fund PE STP ROW Local CST STP
Phase Fund CST STP

Phase Fund CST STP

Phase Fund ROW STP

Phase Fund CST STP

Phase Fund CST H170

Phase PE ROW ROW CST

Fund NHS NHS NHS Bond

Phase Fund

PE

NHS

CST Bond

Year Underway Underway
LOCL 2006 Year Underway 2005 2005
Year LUMP
Year Underway
LOCL LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year 2005
Year Underway Underway
2005 2007 Year Underway 2007

Federal

State

$0 $3,545,600
Federal
$430,200 $9,129,600

$0 $886,400 State
$47,800 $1,014,400

Federal $449,600

State $112,400

Federal
$0 $105,300
Federal $800,000

State
$0 $11,700
State $200,000

Federal $190,000

State $0

Federal $13,600

State $3,400

Federal $600,000

State $0

Federal $1,000,000

State $0

Federal

State

$21,119,200 $0
Federal

$5,279,800 $85,672,660
State

$0 $36,100,000

Other
$460,000 $0
Other $0 $0
Other $0
Other $102,000
$0 Other
$0
Other $0
Other $0
Other $150,000
Other $0
Other
$0 $0 Other $0

Total
$460,000 $4,432,000
Total $478,000 $10,144,000 Total $562,000
Total $102,000 $117,000 Total $1,000,000
Total $190,000
Total $17,000
Total $750,000
Total $1,000,000
Total
$26,399,000 $85,672,660
Total $36,100,000

Page 251 of 300

STA TE TRANSPORTATION IMPROVEMENT PROGRAM
2t7/2QQ5

Richmond

Project: 210700.

Type Work: Widening

Descp: 1-520 FROM SR 4/US 1 TO GORDON HIGHWAY

Lanes: Exist. 4 Prop. 6

Length: 3.20 TlP#: NHS-IO

Project: 222710- Type Work: Median Work Descp: SR 10/US 78 FM SR 121/US 25 TO WALTON
WAY-CONSTRUCT BARRIER Length: 3.50
TlP#: NHS-7

Project: 227800. Type Work: ATMSIITS Descp: ATMS/ AUGUSTA SLO SCAN/CMS/RADAR

Length: 0.00 TlP#: NHS-9

Project: 227805- Type Work: ATMS/ITS

Descp: ATMS/I-20 COMMUNIC/SURVEILLANCE FM SR

388/COLUMBIA TO SC

Length: 1172

TlP#: NHS-9

Project: 227810. Type Work: ATMS/ITS

Descp: ATMS/ AUGUSTA/RICHMOND COUNTY/GDOT

REGIONAL TCC

Length: 0.00

TlP#: NHS-9

Project: 245320- Type Work: Widening

Descp: WINDSOR SPRNGS RD/CR 65 FM SR

88/HEPHZIBAH TO WILLIS FOREMAN

Lanes: Exist. 2 Prop. 4

Length: 2.25

TlP#: STP-17

Project: 245325- Type Work: Replace Bridge

Descp: CR 651WINDSOR SPRINGS RD @ NOR-SOU RR

(734145PjIHEPHZIBAH

Lanes: Exist. 2 Prop. 4

Length: 0.21

TlP#: BRM-I

Project: 250510. Type Work: Widening

Descp: WRIGHTSBORO RD/CR 1501 FM JIMMIE DYESS

PKWY TO 1-520 RAMPS

Lanes: Exist. 2 Prop. 4

Length: 2.55

TlP#: STP-6

Project: 250560- Type Work: Widening

Descp: DAVIS RD FM SKINNER MILL TO WASHINGTON RD

&1-20 HALF DIAMOND

Lanes: Exist. 2 Prop. 4

Length: 1.60

TlP#: STP-8

Project: 250610- Type Work: Widening

Descp: WINDSOR SPRINGS RD/CR 65 FM WILLIS

FORMAN RD TO TOBACCO RD

Lanes: Exist. 2 Prop. 4

Length: 2.68

TlP#: STP-16

Project: 250615. Type Work: Replace Bridge

Descp: CR 651WINDSOR SPRINGS RD @ SPIRIT CREEK

2.7 MI N/HEPHZIBAH

Lanes: EXist. 2 Prop. 4

Length: 0.21

TIP#: BRM-6

Phase Fund PE NHS ROW NHS CST Bond

Year 2005 After 2007 After 2007

Phase Fund

PE

NHS

ROW Local

CST NHS

Year Underway
LOCL 2006

Phase Fund CST NHS

Year 2007

Federal $1,056,000
Federal $0
$3,576,800
Federal $1,320,800

State $264,000
State $0
$894,200
State $330,200

Other $0
Other $0 $0
Other $0

Phase Fund CST NHS

Year 2007

Federal $15,520,800

State $3,880,200

Other $0

Phase Fund CST NHS

Year 2006

Federal $968,000

State $242,000

Other $0

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2007

Phase Fund

PE

Bridge

CST Bridge

Year Underway
2007

Federal
$0 $5,980,000

State

Other

$0 $1,495,000

$8,343,000 $0

Federal $800,000

State $200,000

Other $0

Phase PE ROW CST

Fund STP STP STP

Year Underway
2005 2007

Phase Fund

PE

STP

ROW 077

CST STP

Year Underway Underway
2005

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL 2007

Phase Fund

PE

Bridge

CST Bridge

Year Underway
2007

Federal
$4,320,000 $9,200,000

State
$1,080,000 $2,300,000

Federal

State

Other $0 $0
Other

$8,231,200 $2,057,800

$0

Federal
$0 $8,364,000

State

Other

$0 $2,091,000

$9,955,000 $0

Federal $620,800

State $155,200

Other $0

Total
$1,320,000
Total $0 $4,471,000
Total
$1,651,000 Total
$19,401,000
Total
$1,210,000 Total
$8,343,000
$7,475,000
Total $1,000,000
Total
$5,400,000
$11,500,000 Total
$10,289,000 Total
$9,955,000
$10,455,000
Total $776,000
Page 252 of300

.;


STATE TRANSPORTATION IMPROVEMENT PROGRAM ZaJ2005

Richmond

Project: 262750- Type Work: New Construction

Descp: ST. SEBASTIAN/GREENE ST EXT/SR 28 NEAR CSX

RR & 15TH ST

Length: 2.00

TlP#: DEMO-3

Project: M002958 Type Work: Bridges

Descp: SR 10@6LOCATIONS IN RICHMOND COUNTY-

DECK REPLACEMENT

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: TOO0648 Type Work: Transit Projects Descp: FY 2005 SECTION 5307 CAPITAL FOR AUGUSTA

Length: 0.00 TlP#:

Project: TOO0649 Type Work: Transit Projects Descp: FY 2005 SECTION 5309 CAPITAL FOR AUGUSTA

Length: 0.00 TlP#:

Project: TOO0650 Type Work: Transit Projects Descp: FY 2005 SECTION 5310 CAPITAL FOR AUGUSTA

Length: 0.00 TlP#:
Project: TOO0913 Type Work: Transit Projects Descp: FY 2006 SECTION 5307 CAPITAL FOR AUGUSTA

Lenglh: 0.00 TlP#:

Project: TOO0914 Type Work: Transit Projects Descp: FY 2006 SECTION 5309 CAPITAL FOR AUGUSTA

Lenglh: 0.00 TlP#:

Project: TOO0915 Type Work: Transit Projects Descp: FY 2006 SECTION 5310 CAPITAL FOR AUGUSTA

Lenglh: 0.00 TlP#:

Project: T001229 Type Work: Transit Projects Descp: FY 2007 SECTION 5307 CAPITAL FOR AUGUSTA

Length: 0.00 TIP#:

Project: T001230 Type Work: Transit Projects Descp: FY 2007 SECTION 5309 CAPITAL FOR AUGUSTA

Length: 0.00 TIP#:

project: T001231 Type Work: Transit Projects DesCP: FY 2007 SECTION 5310 CAPITAL FOR AUGUSTA

Length: 0.00 TIP#:

Phase Fund PE Demo ROW Local CST Demo CST Demo CST Demo Phase Fund PE NHS CST NHS

Year Underway
LOCL 2006 2006 2006 Year LUMP LUMP

Federal
$0 $5,596,800 $1,635,200 $6,394,450
Federal $180.000 $1.800.000

State

Other

$0 $1.399.200
$408.800 $336,550 State
$45,000 $450.000

$7,789,000 $0 $0 $0
Other $0 $0

Phase Fund CST Transit

Year 2005

Federal $1.696,464

State $212,058

Other $212,058

Phase Fund CST Transit

Year 2005

Federal $400.000

State $50,000

Other $50.000

Phase Fund CST Transit

Year 2005

Federal $59,490

State $14,873

Other $0

Phase Fund CST Transit

Year 2006

Federal $3.162,600

State $395,325

Other $395,325

Phase Fund CST Transit

Year 2006

Federal $400,000

State $50.000

Other $50,000

Phase Fund CST Transit

Year 2006

Federal $62,465

State $15,616

Other $0

Phase Fund CST Transit

Year 2007

Federal $1,188,600

State $148.575

Other $148.575

Phase Fund CST Transit

Year 2007

Federal $400.000

State $50.000

Other $50,000

Phase Fund CST Transit

Year 2007

Federal $65,588

State $16,397

Other $0

Total $7,789,000 $6,996,000 $2,044.000 $6.731.000
Total $225,000 $2.250.000
Total $2,120,580
Total $500,000
Total $74,363
Total $3.953,250
Total $500,000
Total $78,081
Total $1,485.750
Total $500,000
Total $81.985

Page 253 of 300

STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM 2/7/2005

Rockdale

Project: 0000416 Type Work: Widening

Descp: SR 20 FM SHARON CHURCH RD TO PLEASANT

HILL RD Lanes: Exist. 2

Prop. 4

Length: 4.29

TlP#: AR-9\9

Project: 0003166 Type Work: HOV Lanes

Descp: 1-20 FM EVANS MILL RD/DEKALB TO SALEM

RD/ROCKDALE HOV LANES

Lanes: Exist. 6 Prop. 8

Length: 9.73

TIP#: AR-H-2S\A

Project: 0004433 Type Work: Widening

Descp: PARKER RD FM MILLERS CHAPEL RD TO FLAT

SHOALS RD PHASE 3 Lanes: Exist. 2 Prop. 4

Length: 0.59

TlP#: RO-OISE

Project: 0004434 Type Work: Minor Widen & Resurf

Descp: SR 1621SALEM ROAD FM FLAT SHOALS RD TO

OLD SALEM ROAD

Length: 0.42

TlP#: RO-206

Project: 0004487 Type Work: Intersection Improvement

Descp: SIGMAN ROAD AT EASTVIEW ROAD FY 2004 LCI

PROJECT

Length: 0.40

LUMP SUM PROJECT

TlP#: RO AR 203

Project: 0004647 Type Work: Intersection Improvement Descp: IRIS DRIVE AT MCDANIEL MILL ROAD

Length: 0.40 TIP#: RO-230
Project: 0004648 Type Work: Intersection Improvement Descp: LENORA CHURCH ROAD AT PLEASANT HILL
ROAD Length: 0.40 TlP#: RO-D\
Project: 0004649 Type Work: Intersection Improvement Descp: OLD SALEM ROAD AT MCCALLA ROAD

Length: 0.30 TlP#: RO-232
Project: 0004650 Type Work: Intersection Improvement Descp: SIGMAN ROAD AT GEES MILL ROAD

Length: 0.40 TlP#: ROD3

Project: 0005933 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCATIONS IN ROCKDALE CO Length: 0.00

LUMP SUM PROJECT

TlP#: Lump

Project: 0005955 Type Work: Widening

Descp: SR 121COVINGTON HIGHWAY FM SR 124 TO LAKE

CAPRI ROAD

Lanes: EXist. 2 Prop. 4

Length: 1.25

TIP#: DK030B

Phase Fund

PE

STP

ROW STP

CST STP

Year After 2007 After 2007 After 2007

Phase Fund

PE

NHS

PE

Bond

ROW NHS

CST NHS

Phase PE ROW CST

Fund Bond Bond Bond

Year After 2007
2007 After 2007 After 2007
Year Underway
2006 2007

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year Underway
2006 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
LUMP LUMP

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year Underway
2005 2006

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year Underway
2005 2006

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year Underway
2005 2006

Phase Fund

PE

Bond

ROW Bond

CST Bond

Year 2005 2006 2007

Phase Fund CST STP

Year LUMP

Phase Fund

PE

STP

ROW STP

CST STP

Year 2007 After 2007 After 2007

Federal

State

Federal $0

State $7,100,000

Federal
$0 $0

State
$1,050,000 $3,000,000

Federal
$0 $0

State
$1,250,000 $2,500,000

Federal
$72,000 $400,000

State
$0 $0

Federal
$0 $0

State
$195,000 $480,000

Federal
$0 $0

State
$320,000 $450,000

Federal
$0 $0

State
$170,000 $525,000

Federal $0 $0 $0

State $72,000 $240,000 $550,000

Federal $400,000

State $100,000

Federal $32,000

State $8,000

Other
Other $0
Other $0 $0
Other $0 $0
Other $13,000 $104,000
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0 $0
Other $0
Other $0

Total
Total
$7,100,000 Total
$1,050,000
$3,000,000
Total
$1,250,000
$2,500,000
Total
$85,000 $504,000 Total
$195,000
$480,000
Total $320,000
$450,000
Total
$170,000
$525,000
Total
$72,000
$240,000
$550,000 Total
$500,000
Total
$40,000
Page 254 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Rockdale

Project: 0006257 Type Work: Landscaping Descp: SR 138/SR 20 COMMON SECTION
BEAUTIFICATION INITIATIVE Lenglh: 2.80
TIP#: RO-138C

Project: 0006697 Type Work: Multi-use Trail

Descp: GEORGIA VETERANS MEMORIAL PARK IN

ROCKDALE

Length: 0.00

TlP#:

Project: 231210- Type Work: Widening

Descp: SR 1621SALEM RD FM BROWN BR RD/NEWTN TO

S/FLAT SHOALSIRCKDLE

Lanes: Exist. 2 Prop. 6

Length: 3.72

TlP#: NE-004

Project: 714065- Type Work: ATMS/ITS

Descp: ATMS/I-20 COMM/SURVEILLANCE FM 1-285/DEK

TO SR138/SR201R0CK

Length: 14.93

TlP#: AR-305

Project: 731047- Type Work: Widening

Descp: SR 138/SR 20 FROM NORTH OF 1-20TO SIGMAN

ROAD Lanes: Exist. 4

Prop. 6

Length: 1.70

TIP#: RO-138D

Project: 742980- Type Work: Replace Bridge Descp: SR 212 @ HONEY CREEK 2.5 MI S OF JCT SR 138

Length: 0.76 TlP#: RO-229

Project: 752200- Type Work: Widening

Descp: SR 20/CR 435/SIGMAN RD FM IRWIN BRIDGE

RD/CR 442 TO SR 138

Lanes: Exist. 2 Prop. 4

Length: 2.72

TIP#: RO-OI4B

Project: 752270- Type Work: Widening

Descp: OLD COVINGTON HWY FM GREEN ST TO SR

138/20 Lanes: Exist. 2

Prop. 4

Length: 0.65

TIP#: RO-034

Project: 752360 Type Work: Widening

Descp: FLAT SHOALS ROAD FROM OLD SALEM ROAD TO

SALEM ROAD Lanes: Exist. 2 Prop. 4

Lenglh: 1.34

TIP#: RO-025C

Project: 752380 Type Work: Widening

Descp: PARKER RD/CR 92 FM S/FLAT SHOALS TO

CULPEPPER DR/CS 651

Lanes: Exist. 2 Prop. 5

Length: 1.07

TlP#: RO-OI5D

Project: 752400 Type Work: Replace Bridge Descp: HURST ROAD AT HONEY CREEK

Lenglh: 0.40 TIP#: RO-049

Phase Fund PE HPP CST 4260

Year 2005 2005

Phase Fund CST H170

Year 2005

Federal $80,000
$720,000

State $0 $0

Other $20,000 $180,000

Federal $500,000

State $0

Other $0

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 After 2007 After 2007

Federal $1,840,000

State $460,000

Phase Fund PE NHS CST Bond

Year 2005 2006

Federal $160,000
$0

State $40,000 $24,715,176

Other $0
Other $0 $0

Phase Fund ROW NHS CST NHS

Year Underway
2006

Federal $7,985,600

State $1,996,400

Other $0

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
2006 2007 2007
Year 2005 LOCL After 2007

Federal
$16,000 $460,800 $942,400
Federal $4,000 $0

State
$4,000 $115,200 $235,600
State $1,000 $0

Other
$0 $0 $0
Other $0
$570,000

Phase PE ROW CST

Fund Bond Bond Bond

Year Underway
2006 2007

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL 2006

Federal
$0 $0

State
$250,000 $1,041,000

Other
$0 $0

Federal
$0 $4,248,800

State

Other

$0 $1,062,200

$2,000,000 $0

Phase PE ROW CST

Fund STP Bond Bond

Year Underway Underway
2005

Federal

State

Other

$0 $2,850,000

$250,000

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2007

Federal
$0 $562,400

State
$0 $140,600

Other
$300,000 $0

Total $100,000 $900,000
Total $500,000
Total $2,300,000
Total $200,000 $24,715,176
Total $9,982,000
Total $20,000 $576,000 $1,178,000 Total
$5,000 $570,000
Total $250,000 $1,041,000
Total $2,000,000 $5,311,000
Total
$3,100,000
Total $300,000 $703,000

Page 255 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM
zat2QQ5

Rockdale
Project: 752420- Type Work: Intersection Improvement Descp: ROCKBRIDGE RD/CR 74 @ MAIN ST IN CONYERS

LUMP SUM PROJECT

Length: 0.42 TlP#: RO-052

Project: 753075. Type Work: Turn Lanes Descp: SR 20 @ OGLESBY BRIDGE RD/CR 1

Lanes: Exist. 2 Prop. 3

Length: 0.40 T/P#: RO-202D

Project: 762440- Type Work: New Construction

Descp: SMYRNA RD & DOGWOOD DR EXTENSION FM

OLD COVINGTOr-J TO DOG'vVOOD

Lanes: Exist. 0 Prop. 2

Length: 0.65

TlP#: RO-023A

Project: T000600 Type Work: Transit Projects

Descp: FY 2005 SECTION 5310 CAPITAL FOR ROCKDALE

COUNTY

Length: 0.00

TIP#: AR-RO-5310

Project: T000997 Type Work: Transit Projects

Descp: FY 2006 SECTION 5310 CAPITAL FOR ROCKDALE

COUNTY

Length: 0.00

TIP#: AR-RO-5310

Project: T001277 Type Work: Transit Projects Descp: FY 2007 SECTION 5310 CAPITAL FOR ROCKDALE
COUNTY Length: 0.00
TIP#: AR-RO-5310

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL Underway

Phase PE ROW CST

Fund Local Local PR

Year LOCL LOCL 2007

Phase Fund CST Transit

Year 2005

Phase Fund CST Transit

Year 2006

Phase Fund CST Transit

Year 2007

Federal $0
$225,000
Federal $0

Slale $0 $0
Slale $0

Federal $0 $0 $0

Slate $0 $0
$1,000,000

Federal $11,440

Slate $2,860

Federal $12,013

Stale $3.003

Federal $12,613

State $3,153

Other $0
$203,000
Olher $100,000
Other $50,000 $100,000
$0
Other $0
Olher $0
Other $0

Total $0
$428,000
Total $100,000 Total
$50,000
$100,000
$1,000,000
Total
$14,300
Total
$15,016 Total
$15,766
Page 256 of 300

.'

STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Schley
Project: 322730- Type Work: Widening Descp: SR 3/US 19 FROM SR 271 TO SR 240

Lanes: Exist. 2 Prop. 4

Length: 10.37 TlP#:

Project: 343345- Type Work: Replace Bridge

Descp: SR 153@ UTILE MUCKALEE CREEK 3.0 MI E OF

JCT SR45

Length: 0.32

TIP#:

Phase PE PE ROW ROW CST Phase PE ROW CST

Fund State Bond Bond 43410 Bond
Fund Bridge Bridge Bridge

Year Underway Underway Underway Underway
2006 Year Underway 2005 After 2007

Federal

State

$0 Federal

$25,548,000 State

$24,000

$6,000

Other

Total

$0 Other
$0

$25,548,000 Total
$30,000

Page 257 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2012005

Screven

Project: 227830- Type Work: Replace Bridge

Descp: SR 73/US 301 @ SOUTH FORK OGEECHEE CRK

6.8 MI S OF SYLVANIA

Length: 0.44

TlP#:

Project: 227831- Type Work: Replace Bridge Descp: SR 73IUS 301 @ OGEECHEE CREEK 2.8 MI S OF
SYLVANIA Length: 0.29
TlP#:

Project: 231670- Type Work: Replace Bridge

Descp: SR 73IUS 301 @ OGEECHEE RIVER OVERFLOW

11 MI NW OF OLIVER Lanes: Exist. 2 Prop. 4

Length: 0.25

TlP#:

Project: 231680- Type Work: Replace Bridge

Descp: SR 73IUS 301 @ NORFOLK SOUTHERN RR

(620143J) SOUTH OF SR 17

Lanes: Exist. 2 Prop. 4

Length: 0.22

TlP#:

Project: 231760. Type Work: Widening

Descp: SR 73IUS 301 FM SR 17 N TO EXISTING 4LN AT

SYLVANIA BYPASS

Lanes: Exist. 2 Prop. 4

Length: 9.95

TlP#:

Project: 231790- Type Work: Widening

Descp: SR 73IUS 301 FROM NORTH END OF SYLVANIA

BYPASS TO CR 243

Lanes: Exist. 2 Prop. 4

Length: 13.95

TlP#:

Project: 231800. Type Work: Widening

Descp: SR 73IUS 301 FM CR 243 TO S.C. L1NE{& BRDGE @

SAVANNAH RVR}

Lanes: Exist. 2 Prop. 4

Length: 1.40

TlP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2006

Phase Fund

PE

Bridge

CST Bridge

Year Underway
2007

Federal $1,180,000
Federal $1,018,400
Federal $670,400

Phase Fund

PE

Bridge

CST Bridge

Year Underway
2007

Federal $1,132,800

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 After 2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 After 2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 After 2007 After 2007

Federal $836,000
Federal $1.172,800
Federal $295,200

State $295,000 State $254.600 State $167,600
State $283,200
State $209.000
State $293,200
State $73.800

Other $0
Other $0
Other $0
Other $0
Other $0
Other $0
Other $0

Total
$1,475,000 Total $1,273,000 Total
$838,000 Total
$1,416,000
Total
$1.045,000 Total
$1,466.000
Total $369,000
Page 258 of 300

...'''

STATE TRANSPORTATlON IMPROVEMENT PROGRAM
2al2QQ5

Seminole
Project: 0003767 Type Work: Roadway Project Descp: SR 39 FM N OF CR' 99/SPORTSMAN RD TO S OF
CR 71/DRAKE FARM RD Length: 0.50
TIP#:

Project: 0006547 Type Work: Streetscapes

Descp: DOWNTOWN STREETSCAPE IMPROVEMENTS -

PHASE II

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 442935- Type Work: Replace Bridge

Descp: SR 285 @ FISH POND DRAIN APP .5 MI N OF JCT

SR39

Length: 0.22

TIP#:

Phase Fund

PE

STP

ROW STP

CST STP

Year 2007 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Federal $32.000
Federal $450,400

State $8,000
State $0

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2006

Federal $1,063,200

State $265,800

Other $0
Other $112,600
Other $0

Total $40.000
Total $563.000
Total $1.329.000

Page 259 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 27/2005

Spalding

Project: 0000294 Type Work: Widening

Descp: SR 3/US 19/41 FM LAPRADE RD/CR 18 TO SR 20 IN

HENRY COUNTY Lanes: Exist. 4 Prop. 6

Length: 8.55

TlP#: HE166

Project: 0000403 Type Work: Median Work Descp: ATLANTA RD/US 19/41 BUS/SR 92 FM ELLIS RD TO
WTAYLOR ST Length: 0.90
TIP#:

Project: 0000408 Type Work: Intersection Improvement

Descp: SR 16@ CR 35NAUGHN RD & CR 507/ROVER

RD-- TURN LANES

Length: 0.20

LUMP SUM PROJECT

TlP#: AR 157

Project: 0000409 Type Work: Turn Lanes

Descp: SR 16 AT CR 496/688/0LD 85

CONNECTOR/HOLLONVILLE RD

Lanes: Exist. 2 Prop. 3

Length: 0.40

LUMP SUM PROJECT

TlP#: AR 157

Project: 0000410 Type Work: Intersection Improvement

Descp: SR 362 @ CR 507/ROVER-WILLIAMSON

ROADS--TURN LANES Lanes: Exist. 2 Prop. 3

Length: 0.48

LUMP SUM PROJECT

TlP#: AR t57

Project: 0000882 Type Work: Passing Lanes Descp: SR 155 NORTHBOUND FROM MP 9.79 TO MP 10.79

Lanes: Exist. 2 Prop. 3

Length: 1.07 TIP#: SPOO5

Project: 0001573 Type Work: Turn Lanes Descp: SR 3/US 19/41 MEDIAN TURN LANES FM GRIFFIN
TO HENRY CO LINE Length: 3.15
TlP#: SPOO7

Project: 0001818 Type Work: Railroad Crossing Descp: ARTHUR K. BOLTON PKWY/ SR 16 GRADE
SEPARATION AT NS RR Length: 1.02
TIP#: SPOO8

Project: 0003862 Type Work: Intersection Improvement Descp: SR 16 @ CR 551WILSON ROAD 2 MILES E OF
GRIFFIN CITY LIMITS Length: 0.12

LUMP SUM PROJECT

TlP#:

Project: 0003926 Type Work: Intersection Improvement Descp: SR 362 @ CR 231/S. PINE HILL ROAD

LUMP SUM PROJECT

Length: 0.30 TlP#:

Project: 0004587 Type Work: Intersection Improvement Descp: SR 155/US 19/41 BUSINESS AT AIRPORT ROAD/CR
43 Length: 0.26

LUMP SUM PROJECT

TlP#:

Phase Fund

PE

NHS

ROW NHS

CST NHS

Year 2007 After 2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund ROW STP CST STP

Year Underway
2005

Phase Fund

PE

NHS

CST NHS

Year Underway
2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2007 After 2007

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund ROW Local CST STP

Year LOCL LUMP

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Federal $688,000
Federal $775,200
Federal $0
$750,600
Federal $0
$349,200
Federal $0
$1,422,000
Federal $771,200
Federal $1,774,400
Federal $400,000
Federal $0
$243,900
Federal $0
$118,800
Federal $0 $0
$203,754

State $172,000

Other $0

State $193,800

Other $0

State

Other

$0 $83,400

$1,310,000 $0

State
$0 $38,800

Other
$507,600 $0

State
$0 $158,000

Other
$165,400 $0

State $192,800

Other $0

State $443,600

Other $0

State $100,000

Other $0

State
$0 $27,100

Other
$8,000 $0

State $0
$13,200

Other $434,300
$0

State $0 $0
$22,639

Other $0 $0 $0

Total
$860,000
Total
$969,000
Total
$1,310,000
$834,000
Total
$507,600
$388,000
Total
$165,400 $1,580,000 Total
$964,000
Total
$2,218,000
Total $500,000
Total
$8,000 $271,000
Total
$434,300
$132,000
Total
$0
$0
$226,393 Page 260 of300

.'e..','

STATE TRANSPORTATION IMPROVEMENT PROGRAM
Za12QQ5

Spalding
Project: 0005568 Type Work: Replace Bridge Descp: SR 92 @ FLINT RIVER 6.6 MILES W OF GRIFFIN

Length: 0.40 TlP#: SP-009

Project: 323060- Type Work: Replace Bridge

Descp: SR 155/JACKSON ROAD @ CABIN CREEK 2 MI E

OF GRIFFIN

Length: 0.28

TlP#: SP-OII

Project: 331520- Type Work: Passing Lanes Descp: SR 155 NB MP 5.79-6.84ISB 8.5-9.75INB 11.86-12.94

Lanes: Exist. 2 Prop. 4

Length: 338 TIP#: SP-OI2

Project: 331910- Type Work: Replace Bridge

Descp: CR 508/JORDAN HILL RD N/GRIFFIN @

TROUBLESOME CRK

Length: 0.40

TlP#: SP-OI9

Project: 331970- Type Work: Turn Lanes Descp: SR 155@ TEAMON ROADICR 514

Lanes: Exist. 2 Prop. 3 LUMP SUM PROJECT

Length: 0.27 TlP#:

Project: 332520- Type Work: Widening

Descp: SR 16/ARTHUR BOLTON FM REHOBOTH

RD/SPALDING TO 1-75/BUTTS

Lanes: Exist. 2 Prop. 4

Length: 7.64

TIP#: SP-020

Project: 332890- Type Work: Turn Lanes Descp: SR 3IUS 19 TURN LANES AT SR 16 IN GRIFFIN

Lanes: Exist. 4 Prop. 5

Length: 0.33 TIP#: SP-021

Project: 343240- Type Work: Replace Bridge Descp: SR 155@ TOWALIGA RIVER 6.5 MI NE OF GRIFFIN

Length: 0.37 TIP#: SP-025

Project: 343380- Type Work: Replace Bridge

Descp: SR 155@TROUBLESOME CREEK 6 MI NE OF

GRIFFIN

Length: 0.40

TlP#: SP-026A&B

Project: 343460- Type Work: Replace Bridge Descp: CS 797/SIXTH STREET @ SR 155-CS
792-NOR-SOU RR IN GRIFFIN Length: 0.20
TIP#: SP-027

Project: 350710- Type Work: Widening

Descp: CS 877/W MCINTOSH RD/GRIFFIN FM OLD

ATLANTA RD TO US 41/SR 3

Lanes: Exist. 2 Prop. 4

Length: 0.35

TIP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year 2005 After 2007 After 2007

Federal $89,600

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2006

Federal $1,168,800

Phase PE ROW CST

Fund STP STP STP

Year Underway Underway
2006

Federal $2,098,400

Phase Fund

PE

Bridge

CST Bridge

Year 2005 2007

Federal $9,600
$96,800

Slale $22,400
Slale
$292,200 Slate
$524,600 State
$2,400 $24,200

Phase Fund PE STP ROW Local CST STP

Year Underway
LOCL LUMP

Federal
$0 $262,800

State
$0 $29,200

Phase Fund

PE

STP

ROW STP

CST STP

CST STP

Phase PE ROW CST

Fund NHS NHS NHS

Year Underway Underway
2005 2005
Year Underway
2007 After 2007

Federal
$670,332 $17,448,000
Federal $560,000

State
$167,583 $4,362,000
State $140,000

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2006

Federal $1,597,600

State $399,400

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway Underway
2005 2005
Year Underway
LOCL 2007

Federal
$466,867 $400,000 Federal
$0 $2,115,200

State
$116,717 $100,000 State
$0 $528.800

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL Underway

Federal $0

State $0

Other $0
Other
$0 Other
$0 Other
$0 $0
Other $300,000
$0 Other
$0 $0 Other $0
Other
$0 Other
$0 $0 Other $40,000 $0 Other $0

Total $112,000
Total
$1,461,000 Total
$2,623,000 Total $12.000 $121,000
Total $300,000 $292,000 Total
$837,915 $21,810,000
Total $700,000
Total
$1,997,000 Total
$583,584 $500,000 Total
$40,000 $2,644,000
Total $0

Page 261 of 300

STATE TRANSPORTA TJON IMPROVEMENT PROGRAM
2al2QQ5

Spalding

Project: 351220-

Type Work: Intersection Improvement

Descp: MACON RDICR 511 AT EAST COLLEGE STICR 253

& FUTRAL RDICR 56

Length: 0.90

LUMP SUM PROJECT

TlP#:

Project: 770321-

Type Work: Rail Projects

Descp: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON)

PHASE 2

Length: 0.00

TlP#: AR26813

Project: MOO1994 Type Work: Bridges
Descp: BRIDGE JACKING @ SEV LOCS IN BUnSISPALDINGjHENRY COUNTIES Length: 1.60

LUMP SUM PROJECT

TlP#: AR311

Project: M002714 Type Work: Resurface & Maintenance

Descp: SR 155 FM E OF NORTH HILL STREET TO

MCDONOUGH ROAD

Length: 5.66

LUMP SUM PROJECT

TlP#:

Project: TOO1364 Type Work: Rail Projects Descp: COMMUTER RAIL ATLANTA/LOVEJOY
(OPERATIONS ASSISTANCE) Length: 0.00
TlP#: AR-268F

Phase PE ROW CST

Fund STP Local STP

Year Underway
LOCL LUMP

Phase Fund CST NHS

Year 2005

Phase Fund

PE

NHS

CST NHS

Year Underway
LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST CMAQ

Year 2006

Federal
$0 $1.183,500

State
$0 $131.500

Other
$300.000 $0

Federal $7,728,000

State $1.932,000

Other $0

Federal $1.200.000

State $300,000

Other $0

Federal $392.000

State $98,000

Other $0

Federal $5.500.000

State $0

Other $1,375,000

Total
$300.000
$1,315,000 Total $9.660.000 Total
$1,500.000 Total
$490,000
Total
$6,875,000
Page262of300

I'.e..''


STATE TRANSPORTA nON IMPROVEMENT PROGRAM 21712005

Stephens

Project: 0000143 Type Work: Streetscapes

Descp: DOWNTOWN TOCCOA STREETSCAPE PROJECT

PHASE III

Length: 0.00

LUMP SUM PROJECT

TlPII:

Phase PE ROW CST

Fund Local Local STP

Project: 0002360 Type Work: Miscellaneous Improvement Descp: TOCCOA TRAIN MUSEUM (ONLY)

Phase Fund CST STP

LUMP SUM PROJECT

Length: 0.00 TIPII:

Project: 0006450 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN HABERSHAM/STEPHENS Length: 0.00

LUMP SUM PROJECT

TlPII:

Phase Fund

PE

STP

CST STP

Project: 121360. Type Work: Bridge Rehab Descp: SR 17 @ OGGS BRANCH
Length: 0.30 TlPII:

Phase Fund

PE

Bridge

CST Bridge

Project: 122260- Type Work: Widening

Descp: SR 17 FROM NW OF CR 13/RUMSEY ROAD TO

MEMORIAL DRIVE

Lanes: Exist. 2 Prop. 4

Length: 4.96

TIPII:

Project: 122670. Type Work: Widening

Descp: SR 17 FROM SR 184/365 SE OF TOCCOA EAST TO

SR 17 ALT.

Lanes: Exist. 2 Prop. 4

Length: 5.35

TIPII:

Project: 132440. Type Work: New Construction

Descp: SR 365ITOCCOA BYP EXT @ SR 17 NE ON NEW

LOC TO SR 365@CR 311

Lanes: Exist. 0 Prop. 4

Length: 5.70

T/PII:

Phase PE PE ROW CST

Fund State Bond Bond Bond

Phase PE PE ROW CST

Fund State Bond Bond Bond

Phase PE ROW ROW CST

Fund STP STP STP STP

Year LOCL LOCL LUMP
Year LUMP
Year Underway
LUMP
Year Underway
2007
Year Underway Underway
2006 2007 Year Underway Underway 2005 2007 Year Underway Underway 2007 After 2007

Federal $0 $0
$250,400
Federal $400,000

State $0 $0 $0
State $0

Federal $504,000

State $126,000

Federal $200,000

State $50,000

Federal

State

$0 $0
Federal

$13,164,000 $12,454,000
State

$0 $0
Federal

$2,415,000 $13,634,000
State

$8,247,200 $2,061,800

Other $0 $0
$62,600 Other $100,000
Other $0
Other $0
Other
$0 $0 Other
$0 $0 Other
$0

Total $0 $0
$313,000
Total $500,000
Total $630,000
Total $250,000
Total
$13,164,000 $12,454,000
Total
$2,415,000 $13,634,000
Total
$10,309,000

Page 263 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM ZaJZ005

Stewart
Project: 0000084 Type Work: Streetscapes Descp: RICHLAND BROAD STREET STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TJPII:

Project: T001286 Type Work: Transit Projects Descp: Regional Transit for Quitman, Clay, Randolph &
Stewart Count Length: 0.00
TJPII:

Phase Fund PE Local ROW Local CST STP
Phase Fund CST Transit

Year LOCL LOCL LUMP
Year 2005

Federal $0 $0
$330,400
Federal $491,330

State $0 $0 $0
State $0

-

Other
$0
$0
$82,600 Other
$98,266

Total $0 $0
$413,000
Total $589,596

Page264of300

I..,~.'' ..:''

STATE TRANSPORTATION IMPROVEMENT PROGRAM
zatZQQ5

Sumter

Project: 0005939 Type Work: Intersection Improvement

Descp: SOUTHERFIELD ROAD @ SR 49 & DISTRICT LINE

ROAD EXTENSION

Length: 5.68

TlPII:

Project: 0006546 Type Work: Bicycle/Ped. Facility

Descp: GA SOUTHWESTERN STATE BIKE &PEDESTRIAN

FACILITIES - PHASE II

Length: 0.00

LUMP SUM PROJECT

TIPII:

Project: 0006549 Type Work: Streetscapes Descp: AMERICUS PEDESTRIAN CORRIDOR - PHASE II

LUMP SUM PROJECT

Length: 0.00 TlPII:

Project: 0006942 Type Work: Water Pollution Mitig. Descp: 400.28 ACRES OF WETLANDS IN
SUMTER-MUCKALEE CREEK MITIGATION Length: 0.00

LUMP SUM PROJECT

TlPII:

Project: 322190- Type Work: Widening

Descp: SR 3!US 19 FM CR 42 TO 0.3 MI N/US 280 (INCL

NEWRR BR)

Lanes: Exist. 2 Prop. 4

Length: 6.34

TlPII:

Project: 322193- Type Work: Bridge Rehab Descp: SR 3!US 19 @ CSX RR SOUTH OF US 280

Lanes: Exist. 2 Prop. 4

Length: 0.40 TlPII:

Project: 322195- Type Work: Widening

Descp: SR 3!US 19 FM LEE CO LINE TO CR 421SUMTER

(INCL BRIDGES)

Lanes: Exist. 2 Prop. 4

Length: 5.50

TlP#:

Project: 322310- Type Work: Replace Bridge Descp: SR 3!US 19 @ BEAR BRANCH S/SR 27

Lanes: Exist. 2 Prop. 4

Length: 0.01 TlP#:

Project: 322780 Type Work: Widening

Descp: SR 27!US 280 FROM SR 45 IN PLAINS TO SR 49

SW OF AMERICUS Lanes: Exist. 2 Prop. 4

Length: 7.85

TlP#:

project: 333085- Type Work: Replace Bridge

Descp: SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S

OF ANDERSONVILLE

Length: 0.93

TIPII:

project: 333195 Type Work: Replace Bridge Descp: SR 27@ LIME CREEK 6.7 MI E OF JCT SR 30

Length: 0.22 TlP#:

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

State

PE

State

ROW RRBS

CST RRBS

Phase Fund

PE

Bridge

CST Bridge

Year Underway Underway
2005 2007
Year Underway
2007

Phase Fund

PE

State

PE

State

ROW RRBS

CST RRBS

Phase Fund

PE

Bridge

CST Bridge

Year Underway Underway
2005 2006
Year Underway
2006

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2006

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2007

Federal $140,000

State $35,000

Federal $500,000

State $0

Federal $240,000

State $0

Federal $2,146,400

State $536,600

Federal

State

$0 $0
Federal

$3,500,000 $11,970,000
State

$856,800

$214,200

Federal

State

$0 $0
Federal

$1,077.000 $12,748,000
State

$172,800

$43,200

Federal $2.013.600

State $503,400

Federal
$40,000 $2.338,400
Federal
$36,000 $1,016,800

State $10,000 $584,600
State $9,000
$254.200

Other $0
Other $125,000
Other $60,000
Other $0
Other
$0 $0 Other $0
Other
$0 $0 Other $0
O'ther $0
Other $0 $0
Other $0 $0

Total $175,000
Total $625,000
Total $300,000
Total $2,683,000
Total
$3,500,000 $11,970,000
Total $1.071.000
Total
$1,077,000 $12,748,000
Total $216.000
Total $2,517,000
Total $50.000 $2,923,000 Total $45.000 $1.271,000

Page 265 of 300

STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM W/2QQ5

Sumter

Project: 333196. Type Work: Replace Bridge

Descp: SR 30 @ MUCKALEE CREEK 0.5 MI WEST OF

AMERICUS

Length: 0.76

TlP#:

Project: 343230- Type Work: Intersection Improvement

Descp: SR 308/BONDS TRAIL RD REALIGNMENT FROM

CR 32 TO CR 140

Length: 0.55

TIP#:

Project: 343410. Type Work: Replace Bridge Descp: SR 195@ LIME CREEK 5 MI N OF JCT SR 30

Length: 0.22 TlP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2007

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 2006

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2007

Federal
$1,992,800
Federal $9,600
$553,600
Federal $36,000
$1,140,800

State
$498,200
State $2,400
$138,400
State $9,000
$285,200

Other

Total

$0 Other $0 $0 Other
$0
$0

$2,491,000
Total $12,000 $692,000
Total $45.000 $1,426,000

Page 266 of 300

I,'..'.-...''' .
'
'..''

STATE TRANSPORTATION IMPROVEMENT PROGRAM zaL2005

Talbot
Project: 0006095 Type Work: Railroad Crossing Descp: CS 530/MONROE STREET @ CSX #6384340

LUMP SUM PROJECT

Length: 0.40 TlP#:

Project: 333210. Type Work: Replace Bridge Descp: SR 36 @ FLINT RIVER 9.6 MI E OF WOODLAND

Lenglh: 0.46 TlP#:

Project: 343110- Type Work: Replace Bridge

Descp: CR 1721POBIDDY ROAD@ FLINT RIVER N OF JCT

SR 221UPSONITALBOT

Length: 0.66

TlP#:

Project: 343405- Type Work: Replace Bridge Descp: SR 240@ BLACK CREEK 2.6 MI S OF GENEVA

Length: 0.48 TIP#:

Project: MOOOB90 Type Work: Miscellaneous Improvement
Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN DISTRICT 3 Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Phase Fund ROW STP CST STP

Year LUMP
Year Underway
2007 After 2007
Year Underway
LOCL 2007
Year Underway Underway
2005
Year Underway
LUMP

Federal $145,000
Federal $1,004,800
Federal $0
$3,136,800 Federal
$651,200 Federal $236,000

State $0
State $251,200
State $0
$784,200 State
$162,800 State $59,000

Other $0
Other $0
Other $40,000
$0 Other
$0 Other
$0

Total $145,000
Total $1,256.000
Total $40,000 $3,921.000 Total
$814,000 Total $295,000

Page 267 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM ZmZQQ5

Taliaferro
Project: 245375- Type Work: Replace Bridge Descp: SR 22 @ SOUTH & NORTH FORKS OGEECHEE
RIV. S OF CRAWFORDVILLE Length: 0.37
TIP#:

Project: 245377- Type Work: Replace Bridge

Descp: SR 47 @ HARDEN CREEK & TRIBUTARY 8 MI NE

OF CRAWFORDVILLE

Length: 0.54

TlP#:

Project: MOO2466 Type Work: Shoulder Work Descp: 1-20RAMPS AT SR 77 AND SR 22

LUMP SUM PROJECT

Length: 0.80 TlP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2005

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Phase Fund CST 1M

Year LUMP

Federal
$1,767,200 Federal
$1,942,400 Federal
$1,078,200

State
$441,800 State
$485,600 State $119,800

Other

Total

$0
Other

$2,209,000 Total

$0
Other
$0

$2.428.000
Total $1,198,000

Page268ot300

.......e:'''''',

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Tattnall

Project: 0001364 Type Work: Replace Bridge

Descp: SR 56/NAIL BRIDGE @ OHOOPEE RIVER 2 MILES

W OF REIDSVILLE

Lenglh: 0.41

TIP#:

Project: 532640. Type Work: Turn Lanes

Descp: SR 30/US 280 FM SR 56 TO ENTRANCE OF

GORDONIA STATE PARK

Lanes: Exist. 2 Prop. 3

Length: 0.68

TlP#:

Project: 533120. Type Work: Replace Bridge

Descp: SR 144 AT WATERMELON CREEK 3 MI W OF

GLENNVILLE

Length: 0.46

TlP#:

Project: 533160. Type Work: Replace Bridge Descp: SR 144 @ BEARD'S CREEK 2 MI E OF GLENNVILLE

Length: 0.58 TlP#:

Project: 571180. Type Work: Replace Bridge

Descp: MIDWAY RDICR 79 @ CEDAR CREEK 2 MI NORTH

OF COLLINS

Length: 0.50

TlP#:

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 After 2007

Federal $3,200

Phase Fund PE STP ROW STP CST STP

Year Underway Underway
2005

Federal $812,800

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2006

Federal
$8,000 $1,149,600

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway
2005

Federal $1,933,600

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2005

Federal
$0 $777,600

State $800
State
$203,200 State
$2,000 $287,400 State
$483,400 State
$0 $194,400

Other $0
Other
$0 Other
$0 $0 Other
$0 Other $10,000
$0

Total $4,000
Total
$1,016,000 Total $10,000
$1,437,000 Total
$2,417,000 Total $10,000 $972,000

Page 269 of 300

STATE TRANSPORTA nON IMPROVEMENT PROGRAM 2t7I2005

Taylor

Project: 0006560 Type Work: Sidewalks

Descp: BUTLER SIDEWALK ALONG SR 137 TO CEDAR

STREET

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 322710. Type Work: Widening

Descp: SR 3IUS 19 FM CR 201/COOPER RD TO BUTLER

BYPASS & NEW LOC Lanes: Exist. 2 Prop. 4

Length: 10.17

TlP#:

Project: 333205- Type Work: Replace Bridge Descp: SR 128 @ FLINT RIVER 8 MI N OF REYNOLDS

Length: 0.94 TlP#:

Project: 343366- Type Work: Replace Bridge

Descp: SR 137@WHITEWATER CREEK TRIB. 7 MI SW OF

BUTLER

Length: 0.40

TlP#:

Phase Fund CST STP

Year LUMP

Phase Fund

PE

State

PE

NHS

ROW Bond

CST Bond

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway Underway
2005
Year Underway
2007 After 2007

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 After 2007

Federal $188.000

State $0

Federal

State

$0 Federal

$27,413,000 State

$31.200

$7.800

Federal $27.200

State $6.800

Other
$47.000

Total $235,000

Other

Total

$0
Other $0

$27.413.000 Total $39.000

Other
$0

Total $34.000

Page 270 of 300

......''....'''''''''

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2012005

Telfair

Project: 0002366 Type Work: Bicycle/Ped. Facility
Descp: JACKSONVILLE PEDESTRIAN FACILITIESPHASE II Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 531100- Type Work: New Construction

Descp: S MCRAE BYP FM SR 31/US 441 NE TO SR 27/US

341 @ N.MCRAE BYP

Lanes: Exist. 0 Prop. 4

Length: 2.55

TlP#:

Project: 542395- Type Work: Replace Bridge

Descp: SR 117 @ BIG HORSE CREEK 9.2 MI E OF

JACKSONVILLE

Length: 0.40

TlP#:

Project: 561470- Type Work: New Construction

Descp: N MCRAE BYP FM US 341/S BYP TO US

441IWHEELERJINCL SIGNALS

Lanes: Exist. 0 Prop. 4

Length: 2.80

TlP#:

Phase Fund CST STP

Year LUMP

Federal $78,940

State $0

Phase Fund

PE State

PE

Bond

ROW Bond

CST Bond

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2006 After 2007
Year Underway
2005 After 2007

Phase Fund PE State PE Bond ROW State ROW Bond CST Bond

Year Underway Underway Underway
2006 After 2007

Federal

State

$0 Federal
$16,000

$767.000 State
$4,000

Federal

State

$0

$491.000

Other $19,735
Other $0
Other $0
Other
$0

Total $98,675
Total $767.000 Total
$20,000
Total
$491,000

Page 271 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Terrell
Project: 0000452 Type Work: Replace Bridge Descp: CR 164/SASSERHEROD ROAD @ BRANTLEY
CREEK WEST OF SASSER Length: 0.22
TIP#:

Project: 0000453 Type Work: Replace Bridge Descp: CR 164/SASSER-HEROD ROAD @
CHICKASAWHATCHEE CREEK Length: 0.55
TIP#:

Project: 0000454 Type Work: Replace Bridge

Descp: CR 11/BELLFLOWER ROAD @ HEROD CREEK 3.5

MI S'l',jOF DAVVSON

Length: 0.16

TIP#:

Project: 431410. Type Work: Minor Widen & Resurf Descp: SR 49 FM SR 45 FOR APPROX. 3 MILES TO
CORRECT HORIZ ALIGN. Length: 2.98
TIP#:

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2006

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2006

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2005

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2005 After 2007

Federal $0
$612,000
Federal $0
$580,000
Federal $0
$206,400
Federal $44,800

State $0
$153,000
State $0
$145,000
State $0
$51,600
State $11,200

Other $0 $0
Other $0 $0
Other $10,000
$0
Other $0

Total $0
$765,000 Total
$0 $725,000 Total
$10,000 $258,000 Total
$56,000
Page 272 of 300

e

'.

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Thomas
Project: 0001363 Type Work: Replace Bridge Descp: SR 3 ALT @ OCHLOCKNEE RIVER APP 9 MI N OF
JCT SR 38 Length: 0.40
TIP#:

Project: 0001570 Type Work: Turn Lanes Descp: SR 300/US 19 MED TN LANES FM S OF
THOMASVILLE TO MITCHELL CO Length: 20.42
TIP#:

Project: 0005832 Type Work: Intersection Improvement Descp: SR 188 AT CR 124/ROCKY FORD ROAD

Length: 0.40 TIP#:

Project: 0005882 Type Work: Turn Lanes

Descp: SR 38 BUS/US 84@ HANSELL ST 1.05 MI N OF SR

35 THOMASVILLE

Length: 0.24

LUMP SUM PROJECT

TIP#:

Project: 0006550 Type Work: Streetscapes Descp: DOWNTOWN THOMASVILLE - PHASE II

LUMP SUM PROJECT

Length: 0.00 T1P#:

Project: 421970- Type Work: Replace Bridge

Descp: SR 38/US 84 BUS @ GA-FLA RAIL NET INC

NWITHOMASVILLE

Length: 0.28

T1P#:

Project: 442965- Type Work: Replace Bridge

Descp: SR 33 @ REEDY CREEK APP 0.8 MI SOUTH OF

PAVO

Length: 0.30

T1P#:

Project: 470695 Type Work: Replace Bridge

Descp: CR 40/0LD QUITMAN ROAD @ MASSE BRANCH

TRIB. N OF BOSTON

Length: 0.20

T1P#:

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 After 2007

Federal $22,400

State $5,600

Phase Fund

PE

NHS

CST NHS

Year Underway
2007

Federal $11,632,800

State $2,908.200

Phase PE ROW CST

Fund STP STP STP

Year 2006 After 2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase Fund CST STP

Year LUMP

Federal $30,400
Federal $1,466,100
$237,600
Federal $500,000

State $7,600
State $162,900
$26,400
State $0

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2006

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2007

Federal
$3,974,400
Federal $10,400
$516,000
Federal $0
$146,400

State
$993,600
State $2,600
$129.000
State $0
$36,600

Other $0
Other $0
Other $0
Other $0 $0
Other $125,000
Other
$0 Other
$0 $0 Other $0 $0

Total $28.000
Total $14.541,000
Total $38.000
Total $1,629,000
$264,000 Total $625,000
Total
$4,968.000 Total $13,000 $645,000 Total $0 $183.000

Page 273 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM
zaJ2QQ5

Tift

Project: 0000803 Type Work: Widening

Descp: 1-75 FM N CITY LIMITS OF TIFTON TO TURNER CO

LINE - PHASE 2

Lanes: Exist. 4 Prop. 6

Length: 8.00

TlP#:

Project: 0003094 Type Work: Replace Bridge

Descp: CR 411/SCOOTERVILLE ROAD @ TY TY CREEK 6.5

MI NW OF OMEGA

Length: 0.76

TIP#:

Project: 0003385 Type Work: Water Pollution Mitig.

Descp: 1-75STREAM MITIGATION IN TIFT; TURNER &

CRISP COUNT!ES

Length: 0.00

TlP#:

Project: 0003430 Type Work: Widening

Descp: CARPENTER RDICR 75 IN TIFTON FM SR 520lUS

82 TO DAVIS RD

Lanes: Exist. 2 Prop. 5

Length: 2.50

TlP#:

Project: 0006073 Type Work: Widening Descp: 1-75 FM COOK COUNTY LINE TO CR 204 - PHASE 1

Lanes: Exist. 4 Prop. 6

Length: 6.24 TlP#:

Project: 0006551 Type Work: Multi-use Trail Descp: ABAC PEDESTRIAN MALL

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006552 Type Work: Sidewalks Descp: OAK STREET SIDEWALKS AND STREETLIGHTS

LUMP SUM PROJECT

Length: 0.00 TlP#:

Phase Fund

PE

NHS

ROW NHS

CST Bond

Year 2005 After 2007 After 2007

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2006

Phase Fund CST NHS

Year 2007

Federal $2,400,000
Federal $0
$1,128,000
Federal $145,600

State $600,000
State $0
$282,000
State $36,400

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL 2007

Phase Fund

PE

NHS

CST Bond

Year 2005 2007

Federal
$0 $3,703,200

State
$0 $925,800

Federal $400,000
$0

State $100,000 $42,700,000

Phase Fund CST STP

Year LUMP

Federal $500.000

State $0

Phase Fund CST STP

Year LUMP

Federal $91,200

State $0

Other $0
Other $10,000
$0 Other
$0
Other $40,000
$0 Other
$0 $0
Other $125,000
Other $22,800

Total $3,000,000

.,

Total $10,000
$1,410,000
Total
$182.000 Total $40,000 $4,629,000 Total $500,000
$42,700,000
Total
$625,000 Total $114,000
Page 274 of 300

.'
..1J

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2t7I2QQ5

Toombs
Project: 0003902 Type Work: Descp: SR 4 @ SR 178

Intersection Improvement

LUMP SUM PROJECT

Length: 0.10 TlP#:

Project: 0006561 Type Work: Multi-use Trail Descp: LYONS RAILS TO TRAILS

LUMP SUM PROJECT

Length: 0.00 TIP#:

Project: 522130- Type Work: Widening

Descp: SR 4IUS 1 FM LYONS CL TO SOUTH CUOAK PARK

IN EMANUEL CO Lanes: Exist. 2 Prop. 4

Length: 9.20

TlP#:

Project: 522200- Type Work: Widening

Descp: SR 4 LYONS FM S CTY LMTS TO N CTY LMTS/lNCL

1-WY PAIR&CLVT Lanes: Exist. 2 Prop. 4

Length: 3.10

TlP#:

Project: 542415- Type Work: Replace Bridge Descp: SR 56 @ ROCKY CREEK 13 MI SE OF LYONS

Length: 0.80 TlP#:
Project: 542416. Type Work: Replace Bridge Descp: SR 147 @ COBB CREEK 17 MI S OF LYONS

Length: 0.49 TlP#:

Project: 550610 Type Work: Turn Lanes

Descp: SR 292NIDALIA FM MORN'SIDE - LOWERY WITH

RIGHT ON WILSON Lanes: Exist. 2 Prop. 3

Length: 1.32

TlP#:

Phase Fund ROW STP CST STP

Year LUMP LUMP

Phase Fund CST STP

Year LUMP

Phase PE PE ROW CST

Fund State Bond Bond Bond

Phase PE PE ROW CST

Fund Stale Bond Bond Bond

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway Underway
2007 After 2007
Year Underway Underway
2007 After 2007
Year Underway Underway
2005

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2006

Phase PE ROW CST

Fund STP STP STP

Year Underway
2005 2007

Federal $88,650
$148,500

State $9,850
$16,500

Federal $650,400

State $0

Federat

State

$0

$2,750,000

Federat

State

$0 $15,940,000

Federal

State

$1,277,600
Federal $8,000
$1,113,600
Federal $400,000 $2,432,000

$319,400
State $2,000
$278,400
State $100,000 $608,000

Other $0 $0
Other $162,600
Other
$0 Other
$0 Other
$0 Other
$0 $0 Other $0 $0

Total $98,500 $165,000
Total $813,000
Total
$2,750,000 Total
$15,940,000 Total
$1,597,000 Total $10,000
$1,392,000 Total $500,000
$3,040,000

Page 275 of 300

STATE TRANSPORTATlON IMPROVEMENT PROGRAM 2!7I2QQ5

Towns

Project: 0000301 Type Work: Replace Bridge

Descp: SR 17- SR 75 @ HIAWASSEE RIVER 6.5 MI S OF

HIAWASSEE

Length: 0.22

TlP#:

Project: 0000302 Type Work: Replace Bridge

Descp: SR 17- SR 75 @ HIAWASSEE RIVER 3.6 MI S OF

HIAWASSEE

Length: 0.22

TlP#:

Project: 0000303 Type Work: Replace Bridge

Descp: SR 2JUS 76 @ HIGHTOWER CREEK 6.1 MI E OF

HiA'vVASSEE

Length: 0.22

TIP#:

Project: 0000304 Type Work: Replace Bridge

Descp: SR 66 @ BRASSTOWN CREEK .5 MI NW OF

YOUNG HARRIS

Length: 0.22

TlP#:

Project: 0000305 Type Work: Replace Bridge

Descp: SR 66 @ CROOKED CREEK 3.2 MI NW OF YOUNG

HARRIS

Length: 0.22

TlP#:

Project: 0002100 Type Work: New Construction Descp: TOWNS COUNTY APPALACHIAN ACCESS ROAD
PROGRAM Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0002369 Type Work: Sidewalks Descp: HIAWASSEEITOWNS COUNTY SIDEWALK
EXPANSION AND ENHANCEMENT PR Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 132710- Type Work: Widening

Descp: SR 515 FM SR 2 N OF HIAWASSEE TO THE N

CAROLINA LN/CORR A

Lanes: Exist. 2 Prop. 4

Length: 1.13

TIP#:

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund CST APD

Year Underway
2006 2007 2007
Year Underway
2005 2006 2006
Year Underway
2006 After 2007 After 2007
Year Underway
2006 After 2007 After 2007
Year Underway
2006 2007 2007
Year LUMP

Federal
$48,000 $488,000 $488,000 Federal
$48,000 $506,000 $506,000 Federal
$48,000

State
$12,000 $122,000 $122,000 State
$12,000 $126,500 $126,500 State
$12,000

Federal $44,160

State $11,040

Federal
$44,160 $350,000 $350,000 Federal $524,800

State
$11,040 $87.500 $87,500
State $0

Phase Fund CST STP

Year LUMP

Federal $277,222

State $0

Phase Fund

PE

APD

ROW App Dev

CST AppDev

Year Underway
2006 2007

Federal
$1,657,600 $940,800

State
$414,400 $235.200

Other $0 $0 $0
Other $0 $0 $0
Other $0
Other $0
Other $0 $0 '$0
Other $131,200
Other $69,306
Other $0 $0

Total $60,000 $610,000
$610,000
Total $60,000 $632,500
$632,500
Total $60,000 Total $55,200 Total $55.200 $437,500
$437,500
Total $656.000 Total
$346,528
Total $2,072,000 $1,176.000
Page 276of300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Treutlen

Project: 0006451 Type Work: Signals Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN
EMANUELfTREUTLEN Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: M002428 Type Work: Bridges
Descp: SR 46 OVER THE OCONEE RIVER BRIDGE 10#309-0016-0 Length: 0.40

LUMP SUM PROJECT

TIP#:

Phase Fund PE STP CST STP

Year Underway
LUMP

Phase Fund CST PR

Year LUMP

Federal $392,000

State $98,000

Federal $0

State $100,000

Other $0
Other $0

Total $490,000
Total $100.000

Page 277 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Troup

Project: 0002382 Type Work: Landscaping

Descp: LANDSCAPING ON 1185 IN HARRIS AND TROUP

COUNTIES

Length: 34.81

LUMP SUM PROJECT

T1P#:

Project: 0003787 Type Work: Ramp Descp: 1-85 EXIT RAMPS AT SR 18

LUMP SUM PROJECT

Length: 0.27 T1P#:

Project: 0006488 Type Work: Railroad Crossing Descp: CR 263/GREEN STREET @ CSX #050468T

LUMP SUM PROJECT

Length: 0.20 T1P#:

Project: 0006828 Type Work: Multi-use Trail

Descp: YOUNG'S MILL BRIDGE PEDESTRIAN & BICYCLE

TRAIL

Length: 0.00

LUMP SUM PROJECT

T1P#:

Project: 0006629 Type Work: Slreelscapes

Descp: WEST POINT PEDESTRIAN ENHANCEMENT

PROJECT

Length: 0.00

LUMP SUM PROJECT

T1P#:

Project: 0006630 Type Work: Slreelscapes Descp: HOGANSVILLE STREETSCAPE - PHASE II

LUMP SUM PROJECT

Length: 0.00 T1P#:

Project: 321715- Type Work: Widening

Descp: SR 14/US 29 FM CR 403/UPPER GLASS BRIDGE

TO OLD VERNON RD

Lanes: Exist. 2 Prop. 4

Length: 3.05

TIP#:

Project: 322250- Type Work: Widening

Descp: SR 1IUS 27/LAGRANGE FM AUBURN ST TO SR

219IMORGAN ST

Lanes: Exist. 2 Prop. 4

Length: 1.42

T1P#:

Project: 343190- Type Work: Replace Bridge Descp: CS 769/JEFFERSON STREET @ CSX RAILROAD IN
WEST LAGRANGE Length: 0.21
TlP#:

Project: 351170- Type Work: Turn Lanes

Descp: SR 14/US 29 LEFT TURN LANE FROM MEADOW

WAY DR TO SR 14 SPUR

Lanes: Exist. 2 Prop. 3

Length: 0.92

TIP#:

Project: MOO0890 Type Work: Miscellaneous Improvement Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN
DISTRICT 3 Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund CST STP

Phase Fund

PE

STP

CST STP

Phase Fund CST STP

Phase Fund CST STP

Phase Fund CST STP

Phase Fund CST STP

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund PE NHS ROW NHS CST NHS

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Phase Fund

PE

STP

ROW STP

CST STP

Phase Fund ROW STP CST STP

Year LUMP
Year Underway
LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year Underway
2007 After 2007
Year Underway
2005 After 2007
Year Underway
LOCL 2005
Year Underway
2005 2005
Year Underway
LUMP

Federal $449,600
Federal $108,000
Federal $150,000
Federal $160,000
Federal $500,000
Federal $200,000
Federal $2,454,400
Federal $14,288,000
Federal $0
$640,000 Federal $629,600 $1,180,000 Federal $236,000

State $112,400
State $12,000
State $0
State $0
State $0
State $0
State $613,600
State $3,572,000
State $0
$160,000 State $157,400 $295,000 State $59,000

Other $0
Other $0
Other $0
Other $40,000
Other $125,000
Other $50,000
Other $0
Other $0
Other $20,000
$0 Other
$0 $0 Other $0

Total
$562,000
Total
$120,000
Total
$150,000
e Total
$200,000
Total
$625,000
Total
$250,000
Total $3.068,000 Total $17,860,000 Total $20.000 $800,000
Total
$787,000 $1,475.000 Total
$295,000
Page 278 of300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Troup

Project: M002969 Type Work: Guardrail Descp: 1-185 FM CS 22491WILLIAMS RD/MUSCOGEE TO
SR 1ITROUP Length: 30.32

LUMP SUM PROJECT

TIP#:

Phase Fund

PE

1M

CST 1M

Year LUMP LUMP

Federal $1,800,000 $43,200,000

State $200,000 $4,800,000

Other $0 $0

Total $2,000,000 $48,000,000

Page279 of 300

STA TE TRANSPORTA TlON IMPROVEMENT PROGRAM 2t7/2005

Turner
Project: 0000804 Type Work: Widening Descp: 1-75 FM TIFT COUNTY LINE TO SR 159 - PHASE 2

Lanes: Exist. 4 Prop, 6

Length: 11.30 TIP#:

Project: 0000805 Type Work: Widening

Descp: 1-75 FM SR 159 NR ASHBURN TO SR 300/CRISP CO

- PHASE 2 Lanes: Exist. 4 Prop. 6

Length: 14.50

TJP#:

Project: 0003385 Type Work: Water Pollution Mitig. Descp: 1-75STREAM MITIGATION IN TIFT; TURNER &
CRISP COUNTIES Length: 0.00
TJP#:

Project: 0004798 Type Work: Widening

Descp: SR 32 FROM EAST OF 1-75/TURNER TO SR

125/1RWIN

Lanes: Exist. 2 Prop. 4

Length: 10.34

TJP#:

Project: 0005927 Type Work: Signals

Descp: UPGRADE TRAFFIC SIGNALS @ VAR LOCS IN

BEN HILLITURNERIWORTH

Lanes: Exist.

Prop.

Length: 0.00

LUMP SUM PROJECT

TJP#:

Project: 0006016 Type Work: Widening Descp: 1-75FROM SR 32 TO SR 159

Lanes: Exist. 4 Prop. 6

Length: 6.15 TJP#:

Project: 410245-

Type Work: Widening

Descp: 1-75 FM TIFT COUNTY LINE TO SR 32

Lanes: Exist. 4 Prop. 6

Length: 5.11 TJP#:

Project: 442980.

Type Work: Replace Bridge

Descp: SR 112 @ DEEP CREEK 4.6 MI E OF ASHBURN

Length: 0.41 TJP#:
Project: MOO0743 Type Work: Miscellaneous Improvement Descp: SR 7!US 41 AT EAST COLLEGE AVE

LUMP SUM PROJECT

Length: 0.47 TIP#:

Phase PE ROW CST

Fund NHS NHS Bond

Phase PE ROW CST

Fund NHS Bond Bond

Phase Fund CST NHS

Phase Fund

PE

State

ROW State

CST State

Phase Fund CST STP

Phase Fund ROW NHS CST NHS

Phase PE ROW CST

Fund NHS NHS Bond

Phase PE ROW CST

Fund Bridge Bridge Bridge

Phase Fund PE STP CST STP

Year 2005 2006 After 2007
Year 2005 2006 After 2007
Year 2007
Year 2005 After 2007 After 2007
Year LUMP
Year 2005 2005
Year Underway
2005 2005
Year Underway Underway
2005
Year Underway
LUMP

Federal $400,000 $7,124,000

State $100,000 $1,761,000

Federal $2,400,000
$0

State $600,000 $11,604,000

Federal $145,600

State $36,400

Federal $0

Slate $966,000

Federal $1,040,000

State $260,000

Federal $142,600 $26,160,800

Slate $35,700 $6,540,200

Federal

Slale

$40,000 $0

$10,000 $21,059,000

Federal

State

$1,664,000 Federal $349,600

$416,000 State $87,400

Other $0 $0

Total $500,000 $6,905,000

Other $0 $0

Total $3,000,000 $11,604,000

Other $0

Total $162,000

.

Other $0
Other $0
Olher $0 $0
Other $0 $0
Other
$0 Other
$0

Tolal
$966,000 Total
$1,300,000
Total $178,500
$32,701,000
Total
$50,000
$21,059,000
Total
$2,080,000
Total
$437,000
Page 280 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Twiggs

Project: 0000813 Type Work: Widening

Descp: SR 87IUS 23 FROM SR 96ITWIGGS TO 1-16 IN BIBB

COUNTY Lanes: Exist. 2

Prop. 4

Length: 19.96

TIP#: MCN-42

Project: MOO2902 Type Work: Resurface & Maintenance Descp: SR 18 FM SR 18 SPURIWILKINSON TO RAILROAD
TRACKITWIGGS Length: 14.38

LUMP SUM PROJECT

TlP#:

Phase Fund

PE

STP

ROW STP

CST STP

Year 2005 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Federal $256,000
Federal $1,830,400

State $64,000
State $457,600

Other $0
Other $0

Total $320,000
Total $2,288,000

Page 281 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2a/2QQ5

Union

Project: 0001918 Type Work: Intersection Improvement
Descp: SR 11/US 129@CR 1DO/PAT COLWELL &@CR
221PAT HARRALSON DR Length: 0.60

LUMP SUM PROJECT

TlP#:

Project: 132180- Type Work: Replace Bridge Descp: CR 341 @ NOTTLEY RIVER SW OF BLAIRSVILLE

Length: 0.50 TlP#:

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase Fund PE Bridge ROW Local CST Bridge

Year Underway
LOCL 2006

Federal
$13,500 $336,600
Federal
$0 $958,400

State $1,500
$37,400
State
$0 $239,600

Other
$0 $0
Other
$60,000 $0

Total
$15,000 $374,000
Total
$60,000 $1,198,000

.

Page282of300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2!7I2QQ5

Upson
Project: 0000297 Type Work: Widening Descp: SR 3/US 19 FM N OF POTATO CK TO ATWATER
RDICR 8 IN THOMASTON Length: 2.47
TfP#:

Project: 322550- Type Work: Widening

Descp: SR 74 FM HOLSTUN DR TO TRICE ROAD IN

THOMASTON

Lanes: Exisl. 2 Prop. 5

Lenglh: 1.42

TIP#:

Project: 322920- Type Work: Intersection Improvement Descp: SR 3/US 19 AT CR 73/EAST AND WEST COUNTY
ROAD IN THOMASTON Length: 0.20
TlP#:

Project: 322922- Type Work: Replace Bridge Descp: SR 3/US 19 @POTATO CREEK IN THOMASTON

Lanes: Exisl. 4 Prop. 5

Length: 0.23 TlP#:

Project: 333210- Type Work: Replace Bridge Descp: SR 36 @ FLINT RIVER 9.6 MI E OF WOODLAND

Length: 0.46 TlP#:

Project: 343110 Type Work: Replace Bridge

Descp: CR 1721POBIDDY ROAD@ FLINT RIVER N OF JCT

SR 221UPSONITALBOT

Length: 0.66

TlP#:

Project: MOO0890 Type Work: Miscellaneous Improvement

Descp: DRAINAGE IMPROVEMENTS @ SEVERAL LOC IN

DISTRICT 3

Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund PE NHS ROW NHS CST NHS

Phase Fund PE STP ROW STP CST STP

Phase PE ROW CST

Fund NHS NHS NHS

Phase Fund PE Bridge ROW Bridge CST Bridge

Phase Fund PE Bridge ROW Bridge CST Bridge

Phase Fund PE Bridge ROW Local CST Bridge

Phase Fund ROW STP CST STP

Year 2007 After 2007 After 2007
Year Underway Underway
2005
Year Underway
2007 After 2007
Year Underway
2007 After 2007
Year Underway
2007 After 2007
Year Underway
LOCL 2007
Year Underway
LUMP

Federal $536,000
Federal
$2,560,800 Federal
$10,608,000
Federal $22,400
Federal $1,004,800
Federal $0
$3,136,800 Federal $236,000

State $134,000
State $640,200 State $2,652,000
State $5,600
State $251,200
State $0
$784,200 State $59,000

Other $0

Total $670,000

Other

Total

$0

$3,201,000

Other $0

Total $13,260,000

Other $0

Total $28,000

Other $0

Total $1,256,000

Other $40,000
$0
Other $0

Total $40,000
$3,921,000
Total $295,000

Page 283 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM waDD5

Walker
Project: 0000144 Type Work: Streetscapes Descp: ROSSVILLE-CHICKAMAUGA AVE STREETSCAPE

LUMP SUM PROJECT

Length: 0.00 TIP#: TE-144

Project: 0003452 Type Work: Replace Bridge Descp: CR 835/HAPPY VALLEY RD @ CHATTANOOGA CK
4 MI SW OF ROSSVILLE Length: 0.09
TlP#:

Project: 0003453 Type Work: Replace Bridge

Descp: CR 835/HAPPY VALLEY ROAD @ CHATTANOOGA

CREEK OVF=RI=LOW

Length: 0.09

TlP#:

Project: 0003776 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCS ALONG SR 52 AND SR 2 Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0004266 Type Work: Widening Descp: SR 1IUS 27.FM SR 151 TO LAFAYETTE BYPASS

Lanes: Exist. 2 Prop. 4

Length: 7.04 TIP#:

Project: 0005571 Type Work: Replace Bridge Descp: SR 136@WESTCHICKAMAUGACREEK5.7 M SW
OF LAFAYETTE Length: 0.20
TlP#:

Project: 0006617 Type Work: Streetscapes
Descp: HISTORIC DOWNTOWN CHICKAMAUGA STREETSCAPE PROJECT Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0006951 Type Work: Multi-use Trail Descp: LULA LAKE ROAD PEDESTRAIN PATHWAY

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 621610. Type Work: Widening

Descp: SR 1/US 27 FM HARRELL ST/CR 331 IN TRION TO

SR 151/WALKER CO

Lanes: EXist. 2 Prop. 4

Length: 4.72

TlP#:

Project: 650530. Type Work: Widening

Descp: CR 704/MCFARLAND AVE FROM SR 2 TO SALEM

ROAD/CR354

Lanes: Exist. 2 Prop. 4

Length: 0.97

TlP#: STP-98(8)

Project: 671216. Type Work: Bicycle/Ped. Facility
Descp: CHATTANOOGA CREEK GREENWAY MULTI-USE TRAILS & BRIDGE REHAB Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund

PE

Local

ROW Local

CST STP

Year LOCL LOCL LUMP

Phase PE ROW CST

Fund Bridge Local Bridge

Year Underway
LOCL 2007

Phase Fund

PE

Bridge

ROW Local

CST Bridge

Year Underway
LOCL 2007

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $0 $0
$1.000.000
Federal
$0 $259,200
Federal
$0 $396,000
Federal
$884,000

State $0 $0 $0
State
$0 $64,800
State
$0 $99,000
State
$221,000

Phase PE ROW CST

Fund State State Bond

Year Underway Underway
2005

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year 2005 After 2007 After 2007

Phase Fund CST STP

Year LUMP

Federal

State

$0 $20,600,000

Federal $77,600

State $19,400

Federal $600,000

State $0

Phase Fund CST STP

Year LUMP

Federal $136,000

State $0

Phase Fund PE State ROW State CST Bond

Year Underway Underway
2005

Phase Fund PE STP ROW Local CST STP

Year 2005 LOCL After 2007

Phase Fund PE Local ROW Local CST STP

Year LOCL LOCL LUMP

Federal

State

$0 $16,500,000

Federal $60,000 $0

State $15.000
$0

Federal $0 $0
$80,000

State $0 $0 $0

Other $0 $0
$250,000
Other $13,500
$0
Other $16,000
$0
Other $0
Other
$0
Other $0
Other $150,000
Other $34,000
Other
$0
Other $0 $0
Other $0 $0
$20.000

Total
$0
$0
$1.250.000 Total
$13.500
$324.000
Total
$16,000
$495,000 Total $1.105,000 Total
$20,600,000 Total
$97,000
Total
$750,000
Total
$170,000 Total $16,500.000
Total $75.000
$0
Total $0
$0
$100,000 Page 284 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM zaJ2QQ5

Walker

Project: M002542 Type Work: Resurface & Maintenance Descp: SR 136 FROM SR 1/WALKER TO SR 136
CONN/GORDON Length: 19.99

LUMP SUM PROJECT

TlP#:

Phase Fund CST STP

Year LUMP

Federal $1,040,000

State $260,000

Other $0

Total $1,300.000

Page 285 of 300

STATE TRANSPORTA TION IMPROVEMENT PROGRAM 2aI2QQ5

Walton
Project: 0000412 Type Work: Intersection Improvement Descp: SR 10IUS78@SPRING ST/SR lOBUS-ADD WB
RAMPS/UPGRD INTERCHNGE Length: 0.20
TIP#:

Project: 0000413 Type Work: Widening

Descp: SR 11 FM N OF SOCIAL CIR BY l-WAY PAIR IN

MONROE TO CO. LINE Lanes: Exist. 0 Prop. 4

Length: 16.00

TIP#:

Project: 0000414 Type Work: Widening

Descp: SR 138 WIDENING FM NEWTON CTY LN TO SR

4nlllC" "7D IVIV,,",IU
Lanes: Exist. 0

Prop. 4

Length: 12.00

TIP#:

Project: 0000415 Type Work: Widening

Descp: WIDEN SR 10/US 78 FM GWINNETT CTY LN TO SR

10 BU IN MONROE Lanes: Exist. 4 Prop. 6

Length: 9.78

TlP#:

Project: 0000416 Type Work: Widening

Descp: SR 20 FM SHARON CHURCH RD TO PLEASANT

HILL RD

Lanes: Exist. 2 Prop. 4

Length: 4.29

TlP#: AR-919

Project: 0002019 Type Work: Intersection Improvement Descp: SR 81 AT CLAUDE AND TOM BREWER ROADS/CR
88 Length: 0.40

LUMP SUM PROJECT

TlP#:

Project: 0004644 Type Work: Widening

Descp: SR 20ILOGANVILLE HIGHWAY FM OZORA RD TO

SR81

Lanes: Exist. 2 Prop. 4

Length: 3.64

TIP#: GW-020FI&

Project: 0004708 Type Work: Sidewalks Descp: SOCIAL CIRCLE PEDESTRIAN AND BICYCLE
TRAILWAYS Length: 2.80

LUMP SUM PROJECT

TIP#:

Project: 0007103 Type Work: New Construction

Descp: SR 138 EXTENSION FM SR 10/US 78 TO SR

11/MONROE CITY LIMITS

Lanes: Exist. 0 Prop. 2

Length: 0.00

TlP#: WA-026

Project: 132980- Type Work: Replace Bridge Descp: SR 11 @ CSX RAILROAD IN SOUTH SOCIAL
CIRCLE Length: 0.23
TIP#:

Project: 132981. Type Work: Replace Bridge Descp: SR 11 @ APALACHEE RIVER 7.5 MILES NORTH OF
MONROE Length: 0.57
TIP#:

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway
2006 After 2007

Phase Fund PE STP ROW STP CST STP

Year 2007 After 2007 After 2007

Phase Fund

PE

STP

ROW STP

CST STP

Year 2007 After 2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year 2007 After 2007 After 2007

Phase Fund
PE sip
ROW STP
CST STP

Year After 2007 After 2007 After 2007

Phase Fund

PE

STP

ROW Local

CST STP

Year Underway
LOCL LUMP

Phase Fund

PE

Bond

ROW STP

ROW Bond

CST STP

CST Bond

Phase Fund

CST STP

Year Underway
2005 2005 2006 2006 Year LUMP

Phase Fund PE Local ROW Local CST STP

Year LOCL LOCL 2006

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

CST STP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2006 After 2007 After 2007
Year Underway
2006 After 2007

Federal $800,000

State $200,000

Other $0

Federal $3,144,800

State $786.200

Other $0

Federal $1,796,800

State $449,200

Other $0

Federal $1,684,800

State $421.200

Other $0

Federal

State

Other

Federal
$0 $668,700

State
$0 $74,300

Other
$300,000 $0

Federal
$212,000 $0
$560,000 $0
Federal $400,000

State
$53,000 $1,750,000
$140,000 $4.550,000
State $0

Other
$0 $0 $0 $0 Other $100,000

Federal $0 $0
$1,000.000
Federal
$16,000

State $0 $0 $0

Other $300,000 $650,000 $2,200,000

State $4,000

Other $0

Federal $10,400

State $2,600

Other $0

Total
$1.000,000
Total
$3,931.000
Total
$2,246,000
Total
$2.106.000
Total Total
$300,000
$743,000
Total
$265,000 $1.750,000
$700,000
$4,550,000 Total $500,000 Total $300,000 $650,000
$3.200,000
Total $20,000
Total
$13.000
Page 286 of300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Walton

Project: 132982- Type Work: Bridge Rehab Descp: SR 10lUS 78 WBL @ APALACHEE RIVER 4 MI E OF
GRATIS Length: 0.28
TIP#: WA-OI4

Project: 142000- Type Work: Widening

Descp: SR 20 FM ROSEBUD RD TO SR 81 IN LOGANViLL

INCL 1 WAY PAIR

Lanes: Exist. 2 Prop. 5

Length: 5.50

TlP#: WA-02\

Project: 142295- Type Work: Replace Bridge

Descp: SR 81 @ ALCOVY RIVER 1 MI SW OF BOLD

SPRINGS

Length: 0.61

TlP#: WA-OI5

Project: 142296- Type Work: Replace Bridge

Descp: SR 81 @APALACHEE RIVER 1.5 MI NE OF BOLD

SPRINGS

Length: 0.43

TIP#: WAOI6

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 After 2007

Federal $10,400

State $2,600

Phase Fund PE STP ROW STP CST STP

Year Underway
2006 After 2007

Federal $4,491,200

State $1,122,800

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 2006

Federal
$240,000 $1,219,200

State
$60,000 $304,800

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2007 After 2007

Federal $8.000

State $2,000

Other $0
Other $0
Other $0 $0
Other $0

Total $13,000
Total $5,614,000
Total $300,000 $1,524,000 Total
$10,000

Page 287 of 300

STATE TRANSPORTA nON IMPROVEMENT PROGRAM 2f7I2QQ5

Ware
Project: 0006441 Type Work: Replace Bridge Descp: CR 467/BICKLEY HIGHWAY@ CANE CREEK

Length: 0.40 TlP#:

Project: 522780. Type Work: Widening

Descp: SR 38/US 84 FM CR 79/NEEDHAM RD TO SR 38 @

SR 50/US 82 Lanes: Exist. 2 Prop. 4

Length: 5.60

TlP#:

Phase Fund PE Bridge ROW Local CST Bridge

Year 2005 LOCL Atter2007

Phase Fund

PE

State

ROW State

ROW HPP

CST State

Year Underway Atter2007
2007 Atter2007

Federal $28,000 $0

State $7,000 $0

Federal

State

$4,000,000

$1,000,000

Other
$0
$50.000

Total $35.000 $50.000

Other

Total

$0

$5.000.000

Page 288 of 300

.'

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM zmZOO5

Warren

PrOject: 0006420 Type Work: Barriers

Descp: 1-20 FM SR 80 TO RICHMOND COUNTY - CABLE

MEDIAN BARRIERS

Length: 29.52

LUMP SUM PROJECT

TIP#:

Project: 0006640 Type Work: Historic Facilities

Descp: WARREN COUNTY DEPOT REHABILITATION AND

STREETSCAPE

Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 232220- Type Work: Railroad Crossing

Descp: SR 12/E WARRENTON @ SOUTHERN RR

BRID;REMOVE & REPL W/@-GRADE

Lanes: Exist. 2 Prop. 4

Length: 0.40

TIP#:

Phase Fund

PE

STP

CST STP

Year Underway
LUMP

Federal $2.104.200

State $233.800

Phase Fund CST STP

Year LUMP

Federal $190,400

State $0

Phase PE ROW CST

Fund STP STP STP

Year Underway Underway
2005

Federal

State

$693.600

$173,400

Other $0
Other $47.600
Other $0

Total $2.338.000
Total $238.000
Total $867.000

Page 289 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 2/7/2005

Washington

Project: 0000418 Type Work: Median Work

Descp: SR 15 FROM SR 242 TO NEWMAN ST IN

SANDERSVILLE Lanes: Exist. 2 Prop. 4

Length: 0.24

TlP#:

Project: 0002169 Type Work: Railroad Crossing

Descp: CS 704ITHOMAS ST IN DAVISBORO @ NS #

732750G

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 0005834 Type Work: Intersection Improvement Descp: SR 15AT MATTHEWS ROAD IN TENNILLE

LUMP SUM PROJECT

Length: 0.40 TIP#:

Project: 0006562 Type Work: Streetscapes
Descp: DOWNTOWN STREETSCAPE EXTENSION & KAOLIN PARK SIDEWALKS Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 222190- Type Work: Passing Lanes

Descp: SR 15 AT 3 LOC BTWN WRIGHTSVILLE &

TENNILLE/& WASHINGTON

Lanes: Exist. 2 Prop. 3

Length: 4.03

TlP#:

Project: 222280- Type Work: Widening

Descp: SR 24/SR 540 FM SOUTH OF CR 186 TO CR 10 IN

WASHINGTON CO

Lanes: Exist. 2 Prop. 4

Length: 7.80

TlP#:

Project: 222285- Type Work: Widening Descp: SR 24/SR 540 FM CR 10 TO JUST WEST OF SR 68

Lanes: Exist. 2 Prop. 4

Length: 8.00 TlP#:

Project: 231240- Type Work: Passing Lanes

Descp: SR 24 BET SANDERS'LE & DAVISBORO EB MP

14.3-13.4;WB 5.3-7.0

Lanes: Exist. 2 Prop. 3

Length: 1.60

TlP#:

Project: 245080- Type Work: New Construction

Descp: SR 15 BYP/CR 67 EXT FM SR 15 TO SR 242 WEST

OF TENNILLE

Lanes: Exist. 0 Prop. 4

Length: 3.00

TlP#:

Project: 245090. Type Work: Widening

Descp: SR 15 BYP/CR 67 FM SR 242 TO SR 15 {EXC

262480-0.6 Mil

Lanes: Exist. 2 Prop. 4

Length: 4.23

TlP#:

Project: 245140- Type Work: Replace Bridge Descp: SR 24 OVER WILLIAMSON SWAMP CREEK 1.3
MILES NW OF DAVISBORO Length: 0.25
TIP#:

Phase Fund PE STP ROW STP CST STP

Year Underway
2006 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund PE STP ROW STP CST STP

Year Underway
LUMP LUMP

Phase Fund CST STP

Year LUMP

Phase Fund PE STP ROW STP CST STP

Year Underway
2005 After 2007

Phase Fund PE HPP ROW HPP CST Bond

Year Underway
2005 2007

Phase Fund PE NHS ROW Bond CST Bond

Year Underway
2005 2006

Phase Fund PE STP ROW STP CST STP

Year Underway
2005 After 2007

Phase Fund PE STP ROW STP CST STP

Year 2005 After 2007 After 2007

Phase Fund PE STP ROW STP CST STP

Year 2005 After 2007 After 2007

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 2005

Federal $240,000

State $60,000

Federal $100,000

State $0

Federal
$100,000 $1,094,400
Federal $500,000

State
$25,000 $121,600
State $0

Federal $92,800

State $23,200

Federal

State

$2,251,200 $0

$562,800 $21,994,000

Federal

State

$0 $2,008,000 $0 $19,800,000

Federal $12,000

State $3,000

Federal $340,000

State $85,000

Federal $360,000

State $90,000

Federal
$4,000 $2,480,000

State
$1,000 $620,000

Other $0
Other $0
Other $0 $0
Other $125,000
Other $0
Other $0 $0
Other $0 $0
Other $0
Other $0
Other $0
Other $0 $0

Total
$300,000 Total
$100,000
Total e $125,000
$1,216,000
Total $625,000 Total
$116,000 Total $2,814,000
$21,994,000
Total
$2,008,000
$19,800,000 Total
$15,000 Total
$425,000
Total $450,000 Total
$5.000
. $3,100,000
Page 290 of 300



STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 2flI2QQ5

Washington

Project: 262480- Type Work: Minor Widen & Resurf

Descp: SR 24 RELOC ALONG CR 67 FM SR 24 N TO SR

540/FALL LINE FWY Lanes: Exist. 2 Prop. 3

Length: 0.58

TIP#:

Phase PE ROW CST

Fund STP STP STP

Year Underway Underway
2005

Federal $497.600

State $124,400

Other $0

Total $622.000

Page 291 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Wayne
Project: 0006541 Type Work: Sidewalks Descp: ODUM SIDEWALKS & LIGHTING

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 0006542 Type Work: Streetscapes

Descp: SCREVEN STREETSCAPE SIDEWALK

STREETSCAPE ONLY

Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 522390- Type Work: Widening Descp: SR 38IUS 84 FM SR 203 TO CR 392 AT JESUP

Lanes: Exist. 2 Prop. 4

Length: 5.10 TlP#:

Project: 542425- Type Work: Replace Bridge Descp: SR 203@ REEDY CREEK 1.1 MI E OF APPLING CO
LINE Length: 0.54
TlP#:

Project: M002382 Type Work: Bridge Painting Descp: PROPOSED BRIDGE PAINTING @ SEVERAL
LOCATIONS IN WAYNE CO Length: 0.00

LUMP SUM PROJECT

TlP#:

Phase Fund CST STP

Year LUMP

Federal $98,400

State $0

Phase Fund CST STP

Year LUMP

Federal $300,000

State $0

Phase Fund PE State ROW RRBS CST RRBS

Year Underway
2005 2007

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway Underway
2005

Phase Fund CST STP

Year LUMP

Federal

State

$0 $6,44;,000 $0 $11,129,000

Federal

State

$1.176,000
Federal $158,400

$294,000
State $39,600

Other $24,600
Other $75,000
Other $0 $0
Other
$0 Other
$0

Total
$123,000
Total
$375,000
Total
$6,441.000
$11,129,000
Total $1,470,000
Total
$198,000
Page292of300



STATE TRANSPORTATION IMPROVEMENT PROGRAM
ZmZQQ5

Webster

Project: 333165. Type Work: Replace Bridge

Descp: SR 27IUS 280 @ LANAHASSEE CREEK 2.2 MI E OF

PRESTON

Length: 0.50

TlP#:

Project: 343360. Type Work: Replace Bridge Descp: SR 41 @ BEAR CREEK 1.8 MI N OF WESTON

Length: 0.25 TIP#:

Project: 343361- Type Work: Replace Bridge

Descp: SR 41 @ KINCHAFOONEE CREEK IN SW

PRESTON

Length: 0.41

TIP#:

Project: 343362. Type Work: Replace Bridge

Descp: SR 153@ LANAHASSEE CREEK 3.5 MI NE OF

PRESTON

Length: 0.27

TlP#:

Project: 343364. Type Work: Replace Bridge Descp: SR 45 @ KINCHAFOONEE CREEK AND
OVERFLOW W. OF SUMTER CO LINE Length: 0.85
TIP#:

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2006

Federal
$20.000 $1,078,400

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2007

Federal
$10,400 $704,800

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2007

Federal
$8.000 $1.173.600

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2007

Federal
$14,400 $793.600

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2005 2005

Federal
$24.000 $2.609,600

State $5.000
$269.600
State $2.600
$176,200
State $2.000
$293,400
State $3,600
$198,400
State $6,000
$652,400

Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0

Total $25.000 $1.348.000
Total $13.000 $881.000
Total $10.000 $1,467.000
Total $18.000 $992.000
Total $30.000 $3.262.000

Page 293 of 300

STATE TRANSPORTA TlON IMPROVEMENT PROGRAM 21712005

Wheeler
Project: 0001366 Type Work: Replace Bridge Descp: SR 30/US 280 @ OCONEE RIVER AT
WHEELER/MONTGOMERY CO LINE Length: 0.65
TlP#:

Project: 561470. Type Work: New Construction

Descp: N MCRAE BYP FM US 341/S BYP TO US

441IWHEELERIINCL SIGNALS

Lanes: Exist. 0 Prop. 4

Length: 2.80

TIP#:

Project: M002428 Type Work: Bridges

Descp: SR 46 OVER THE OeONI:;!:; HIVER I::lRIDGE

ID#309-o0160

Length: 0.40

LUMP SUM PROJECT

TIP#:

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway
2006 After 2007

Phase Fund

PE

State

PE

Bond

ROW State

ROW Bond

CST Bond

Phase Fund

CST PR

Year Underway Underway Underway
2006 After 2007
Year LUMP

Federal $55,200

State $13,800

Federal

State

$0
Federal $0

$491,000
State $100,000

Other
$0

Total $69,000

Other

Total

$0 Other
$0

$491,000
Total S100,OOO

Page 294 of 300



STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

White

Project: 0001935 Type Work: Welcome center facilities Descp: HARDMAN FARM VISITOR CENTER - PARKING
LOTS&PEDESTRAIN TRIAL Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006665 Type Work: Guardrail

Descp: SR 17/SR 75 FM .08 MI S OF HELEN CITY LIMITS

TO CR 110

Length: 0.65

LUMP SUM PROJECT

TIP#:

Project: 122130- Type Work: Widening

Descp: SR 75 FM SR 75 ALT/CLEVELAND NE TO

ASBESTOS RD/CR 88

Lanes: Exist. 2 Prop. 3

Length: 2.21

TlP#:

Project: 122240- Type Work: Widening

Descp: SR 11/US 129 FM SR 284/CLERMONT TO

CLEVELAND BYPIWHITE CO

Lanes: Exist. 2 Prop. 4

Length: 24.00

TIP#:

Project: 162390- Type Work: New Construction

Descp: CLEVELAND WEST BYP FM SR 11 N ON NEW

LOC/HULSEY RD TO SR 75

Lanes: Exist. 0 Prop. 4

Length: 4.60

TlP#:

Phase Fund CST STP

Year LUMP

Federal $576,800

State $0

Phase Fund PE STP CST STP

Year Underway
LUMP

Federal $81,000

State $9,000

Phase PE ROW ROW CST

Fund STP STP State STP

Phase Fund

PE

STP

ROW STP

CST STP

Year Underway Underway Underway
2007
Year Underway
2007 After 2007

Federal
$3,600,000 Federal
$2,741,600

State
$900,000 State $685,400

Phase PE ROW CST

Fund NHS NHS NHS

Year Underway
2006 After 2007

Federal $5,707,200

State $1,426,800

Other $144,200
Other $0
Other
$0 Other
$0
Other $0

Total $721,000
Total $90,000
Total
$4,500,000 Total
$3,427,000
Total $7,134,000

Page 295 of 300

STA TE TRANSPORTATION IMPROVEMENT PROGRAM 217/2005

Whitfield

Project: 0000931 Type Work: Interchange

Descp: 1-75@ SR 3/US 41/ROCKY FACE EXIT - PHASE 2

INT RECONST Lanes: Exist, 4 Prop, 6

Length: 0,72

TlP#:

Project: 0002377 Type Work: Bicycle/Pad. Facility

Descp: THE ATLANTA CAMPAIGN & MARCH TO THE SEA

HERITAGE TRAILS

Length: 0,00

LUMP SUM PROJECT

TlP#:

Project: 0003776 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOCS
ALONG SR 52 AND SR 2 Length: 0,00

LUMP SUM PROJECT

TlP#:

Project: 0004607 Type Work: Railroad Crossing Descp: CR 3/HENRY OWENS ROAD @ NS# 719723E

LUMP SUM PROJECT

Length: 0,20 TIP#:

Project: 0006081 Type Work: Water Pollution Mitig,

Descp: PARCEL 1W & 2W TO MITIGATE PI# 610890- IN

WHITFIELD COUNTY

Length: 0,00

LUMP SUM PROJECT

TlP#:

Project: 0006318 Type Work: Lighting
Descp: 1-75@ SR 52/wALNUT AVENUE INTERCHANGE LIGHTING Length: 0.40

LUMP SUM PROJECT

TIP#:

Project: 0006618 Type Work: Historic Facilities Descp: NORFOLK SOUTHERN DEPOT AREA RENOVATION

LUMP SUM PROJECT

Length: 0.00 TlP#:

Phase Fund ROW 1M CST 1M

Year 2006 After 2007

Phase Fund CST STP

Year LUMP

Phase Fund PE STP
CST STP

Year Underway
LUMP

Phase Fund CST STP

Year LUMP

Phase Fund ROW SIP

Year LUMP

Phase Fund CST NHS

Year LUMP

Phase Fund CST STP

Year LUMP

Federal $767,700

State $85,300

Federal $688,240

State $0

Federal $884,000

State $221,000

Federal $130,000

State $0

Federal $480,000

State $120,000

Federal $80,800

State $20,200

Federal $250,400

State $0

Other $0
Other $172,060
Other $0
Other $0
Other $0
Other $109,000
Other $62,600

Total
$853,000
Total
$860,300
Total $1,105,000
Total
$130,000 Total
$600,000
Total $210,000
Total
$313,000
Page 296 of 300



STATE TRANSPORTA nON IMPROVEMENT PROGRAM 2aa005

Wilcox

PrOject: 432070.

Type Work: Replace Bridge

Descp: SR 30/US 280 @ ALAPAHA RIVER TRIB. 0.8 MI E

OF SEVILLE

Length: 0.63

TlP#:

Phase PE ROW CST

Fund Bridge Bridge Bridge

Year Underway Underway
2005

Federal

State

$800,000

$200,000

Other $0

Total $1,000,000

Page 297 of 300

STATE TRANSPORTATION IMPROVEMENT PROGRAM 21712005

Wilkes
Project: 0001367 Type Work: Replace Bridge Descp: SR 47/US 378 @ REHOBOTH BRANCH 7.1 MI E OF
WASHINGTON Length: 0.22
TlP#:

Project: 0006067 Type Work: Railroad Crossing Descp: SR 44 SPUR/HARRIS ROAD @ GWCR #279757G

LUMP SUM PROJECT

Length: 0.40 TIP#:

Project: 0006088 Type Work: Railroad Crossing Desco: CR 240/HOSPITAL DRIVE @ CWCR #2797620

LUMP SUM PROJECT

Length: 0.40 TIP#:

Project: 0006608 Type Work: Streetscapes
Descp: CITY OF WASHINGTON PEDESTRIAN ENHANCEMENT PROJECT Length: 0.00

LUMP SUM PROJECT

TlP#:

Project: 221740. Type Work: Widening

Descp: SR 17 FM MP 13.0-16.9IMP 23.2-26.3 INCL 3-CLVTS

&BRDG

Lanes: Exist. 2 Prop. 4

Length: 7.00

TIP#:

Project: 222260- Type Work: Widening

Descp: SR 17 FM N WASHINGTON BYP TO PASSING LN

SO OF CR 193 (EXC)

Lanes: Exist. 2 Prop. 4

Length: 11.75

TlP#:

Project: 222460. Type Work: Passing Lanes

Descp: SR 10: OGLETHORPE MP13.7-15;15.3-16.2&

WILKES: 0-1.5;5.5-7.0

Lanes: Exist. 2 Prop. 3

Length: 5.70

TIP#:

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 2006

Phase Fund CST STP

Year LUMP

Federal
$4,000 $965,600
Federal $145,000

State
$1,000 $241,400
State $0

Phase Fund CST STP

Year LUMP

Federal $175,000

State $0

Phase Fund CST STP

Year LUMP

Federal $140,000

State $0

Phase Fund PE State PE Bond ROW Bond CST Bond

Phase Fund

PE State

PE

Bond

ROW Bond

CST Bond

Phase Fund PE STP ROW STP CST STP

Year Underway Underway
2006 2007
Year Underway Underway
2006 2007
Year Underway
2006 2007

Federal

State

$0 $0
Federal

$300,000 $16,342,000
State

$0 $0
Federal

$4,907,000 $23,110,000
State

$72,000 $4,812,800

$18,000 $1.203.200

Other $0 $0
Other $0
Other $0
Other $35,000
Other
$0 $0 Other
$0 $0 Other $0 $0

Total $5.000
$1.207.000 Total $145,000
Total $175,000
Total $175,000
Total $300,000 $16,342,000 Total $4,907.000 $23,110,000 Total $90,000 $6.016,000
Page 298 of 300

~

..,' '.

STATE TRANSPORTATION IMPROVEMENT PROGRAM 20/2005

Wilkinson

Project: 0000346 Type Work: New Construction

Descp: FALL LINE FWY ON NEW LOC FM US

4411WILKINSON CO TO SR 24

Lanes: Exist. 0 Prop. 4

Lenglh: 9.33

TIP#:

Project: 0006563 Type Work: Streetscapes
Descp: GORDON MAIN STREET STREETSCAPE IMPROVEMENT PROJECT Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 221870- Type Work: New Construction

Descp: FALL LINE FWY/NORTH GORDON BYPASS FM SR

57 TO SR 243 @ LAKE Lanes: Exist. 0 Prop. 4

Length: 7.20

TIP#:

Project: 222220- Type Work: Bridge Rehab

Descp: SR 57 OVER THE OCONEE RIVER AT

WASHINGTON COUNTY LINE

Lanes: Exist. 2 Prop. 3

Length: 0.84

TIP#:

Project: 262470- Type Work: New Construction

Descp: FALL LINE FWY ON NEW LOC FM SR 243 @

MORNINGSIDE TO US 441

Lanes: Exist. 2 Prop. 4

Length: 8.12

TIP#:

Project: M002902 Type Work: Resurface & Maintenance

Descp: SR 18 FM SR 18 SPURIWILKINSON TO RAILROAD

TRACKITWIGGS

Length: 14.38

LUMP SUM PROJECT

TlP#:

Phase Fund ROW Bond CST Bond

Year Underway
2007

Federal

State

$0 $48,487,000

Phase Fund CST STP

Year LUMP

Federal $400,000

State $0

Phase PE ROW CST

Fund HPP HPP HPP

Year Underway Underway
2005

Federal $15,425,600

State $3,856,400

Phase Fund PE Bridge ROW Bridge CST Bridge

Year Underway
2005 2005

Federal
$16,800 $6,488,800

State
$4,200 $1,622,200

Phase Fund PE State PE Bond ROW Bond CST Bond
Phase Fund CST STP

Year Underway Underway Underway
2006
Year LUMP

Federal

State

$0
Federal $1,830,400

$32,759,000
State $457,600

Other $0
Other $100,000
Other
$0 Other
$0 $0 Other
$0 Other
$0

Total $48,487,000
Total $500,000
Total
$19,282,000 Total $21,000
$8,111,000 Total
$32,759,000 Total
$2,288,000

Page 299 of 300

STATE TRANSPORTA TJON IMPROVEMENT PROGRAM 2012005

Worth

Project: 0000522 Type Work: Intersection Improvement

Descp: SR 133 AT COUNTY LINE ROADICR 459 AT

WORTHIDOUGHERTY CO LN

Lanes: EXist. 2 Prop. 4

Length: 0.60

LUMP SUM PROJECT

TIP#: TSM-8

Project: 0005927 Type Work: Signals
Descp: UPGRADE TRAFFIC SIGNALS @ VAR LOCS IN BEN HILLITURNERIWORTH Length: 0.00

LUMP SUM PROJECT

TIP#:

Project: 0006553 Type Work: Streetscapes Descp: SYLVESTER STREETSCAPE & SIDEWALK

LUMP SUM PROJECT

Length: 0.00 TlP#:

Project: 432092- Type Work: Replace Bridge Descp: SR 32@ FLINT RIVER AND OVERFLOW AT THE
LEEIWORTH COUNTY LN. Length: 1.17
TIP#: OR-)

Phase Fund ROW STP CST STP

Year LUMP LUMP

Phase Fund CST STP

Year LUMP

Phase Fund CST STP

Year LUMP

Phase Fund

PE

Bridge

ROW Bridge

CST Bridge

Year Underway
2005 2005

Federal $90,000
$810,000

State $10,000 $90,000

Federal $1,040,000

State $260,000

Federat $500,000

State $0

Federal
$45,600 $4,904,000

State
$11,400 $1,226,000

Other $0 $0
Other $0
Other $125,000
Other $0 $0

Total $100,000 $900,000 Total $1,300,000 Total $625,000 Total $57,000 $6,130,000
Page 300 of 300

e

..'

APPENDIX A
Glossary

.' 1

..'

GLOSSARY OF TERMS
ATMS Advanced Transportation Management System; a computerized system that integrates video, voice, and data management functions to collect information about the transportation infrastructure and performance analysis as well as support traffic management decisions based on real-time information.
CMAQ Congestion Mitigation and Air Quality Improvement Program; directs funds primarily to areas that have failed to reach certain air quality standards. Projects allowed under this program include mass transit improvements and high-occupancy vehicle facilities.
CST Construction; phase of a project that includes the actual construction of the project.

.,'

DONOR STATE BONUS Donor states are states that contribute more to the Highway Trust Fund than they receive back in federalaid highway programs. These states receive a predetermined amount based on a comparison of a projection of all payments into the Highway Trust Fund and the amount received in federal-aid apportionments. Starting with the state with the lowest return, states are brought up to the level of return for states with the next higher level of return until available funds are depleted.
FED Share

'.

Federal Share; portion of funding to be paid for with federal money.
GARVEE Grant Anticipation Revenue Vehicle; bonds against anticipated federal funds for the purpose of accelerating the construction of the "Governor's Road Improvement Program".
GAShare Georgia Share; portion of funding to be paid for with state money.
GRVA GARVEE Advance; advance funding to pay for "Governor's Road Improvement Program" projects with GARVEE bond before converting to regular federal aid funding.
GRVC GARVEE Converted; funding to pay back the GARVEE bond.
HPP High Priority Project; list of 1,850 high priority projects specified by Congress in TEA-21. Funding for these projects totals $9.4 billion over the six years ofTEA-21. Georgia will receive $283.87 million for 40 projects.
HIGHWAY TRUST FUND Federal account established by law to hold receipts collected by the government, earmarked for highway programs and a portion of the mass transit program; supported by the federal gasoline tax and other user taxes.

INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT of 1991 (lSTEA) Transportation bill approved by Congress in 1991.
METROPOLITAN PLANNING ORGANIZATION (MPO) Required by federal regulations in urbanized areas to develop transportation plans and programs; responsible for developing the Transportation Improvement Program (TIP).
NEPA National Environmental Policy Act of 1969; requires federal government to use all practical means and measures to protect environmental values; makes environmental protection a part of the mandate of every federal agency and department.
NHS National Highway System; consists primarily of the Interstates and other major routes. Includes a large percentage of urban and rural principal arterials.
NON-ATTAINMENT The 13 county area around Atlanta that fails to meet federal air-quality standards. Projects in the nonattainment area are not allowed to proceed ifthere is an increase in capacity of a roadway unless they were identified in the 1995 TIP for Atlanta.
OBLIGATION CEILING The maximum amount that a state is expected to receive from the Highway Trust Fund.
OTHShare Other Share; portion of funding to be paid for with money other than federal or state funds; generally provided by local governments.
PE Preliminary Engineering; phase of a project that includes the development ofthe concept, survey, environmental documentation and design plans.
ROW Right of Way; phase of a project that includes the acquisition of any necessary property for the construction of the project.
STATE AID LET Projects that are funded with state money.
STATE HIGHWAY SYSTEM Network of roads maintained by the state including road and bridge construction, maintenance, rehabilitation and restoration. There are approximately 17,947 miles of state highways in Georgia which make up 16% of the total public road system in the state.

e

..' .'.'

STP Surface Transportation Program; federal funding category that provides funding for projects on any federal-aid highway, including the NHS, bridge projects on any public road, transit capital projects, and public bus terminals and facilities.
TRANSPORTATION EQUITY ACT FOR THE 21ST CENTURY (TEA-21) Six year transportation bill approved by Congress in 1998.
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) In metropolitan areas over 50,000 in population, a program of federally funded transportation projects proposed to be carried out in the first three years of adoption by the MPO. There are 11 urbanized areas in Georgia - Chattanooga, Rome, Athens, Augusta, Savannah, Brunswick, Macon, Columbus, Albany, Atlanta, and Warner Robins. The TIPS's are incorporated into the STIP as adopted by the respective governments and approved by the Governor, with no changes.
TYPE WORK - category of project and source of funding ATMIITS - Advanced Transportation Management/Intelligent Transportation System; work relating to computerized transportation system that supports traffic management decisions; commonly known as the NAVIGATOR System. Bicycle/Ped. Facility - generally bike/pedestrian path/lane funded through a Transportation Enhancement Activity (TEA) project. Bridges -lump sum funding identified for bridge maintenance or bridge painting. Bridge Painting - lump sum for bridge painting. Bridge Rehab - bridge rehabilitation - work that will improve and/or widen an existing bridge. Capital - funding identified for the purchase of transit related items. Historic Preservation - restoration or rehabilitation of historic structures that have a direct linkage to the transportation system; funded as part of a Transportation Enhancement Activities (TEA) project. Interchange - work at an interchange. Intersection Improvement - work that will improve an existing intersection. Landscaping - purchase/installation of shrubbery, plants, trees, etc. Lighting - lump sum funding for purchase/installation of lighting along a National Highway System road. Miscellaneous Improvements - identified for various projects that are not necessarily covered by a standard category. New Construction - new roadway construction on new location. Operating: funding identified for the operation of transit systems. Passing Lanes -- passing lanes added along an existing roadway. Preliminary Engineering - the design phase of a project. Ramp - construction work on a ramp at an interchange. Realignment - improvements to the geometry of a roadway. Replace Bridge - construction of a new bridge to replace an existing bridge. Rest Area -construction of rest areas along state routes (Interstates). Resurface and Maintenance - re-paving of a roadway and minor improvements. RR Xing - improvements to a road/rail crossing, such as the installation of gates, bells, lights, or improvements to the crossing itself. Safety - work that is designed to reduce accidents.

'

Shoulder Work - improving and/or widening shoulders on a roadway.

Sidewalks - installation of sidewalk. Signals - installation and/or improvement of signals. Signing - fabrication/installation of roadway signs. Special Studies - lump sum funding for planning and management studies. Turn Lanes - addition of turn lanes at intersections. Water Pollution Mitig. -lump sum funding for wetland mitigation site that were taken by roadway construction. Weigh Station - construction and/or rehabilitation of truck weigh stations. Widening - adding additional travel lanes to a roadway.

e



APPENDIXB
Transit tables


:

T~SIT

.'


Table of Contents:
Urban Transit Programs



Albany ------:----------------------------------------------- 1



Athens ---------------------------------------------------- 7



' Atlanta (Including Metro Counties)---------------------13



Augusta --------------------------------------------------- 23



Brunswick ------------------------------------------------ 30



Columbus ------------------------------------------------- 33



Gainesville------------------------------~------------------ 36



Macon ----------------------------------------------------- 41



Rome ------------------------------------------------------' 48



Savannah--------------------------------------------------- 52

.'


Warner Robins ------------------------------------------- 57 Rural Transit Programs---------------------------------------~- 60



ALBANY



CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5307

Transit Coach/Lease Capital Maintenance Items Maintenance Tools and Equipment Bus Stop Amenities Office & Facility Automation Security/Surveillance Equipment/Upgrade Fareboxes & Related Equipment Office Equipment/Furniture Facility Modifications Multi-Modal Facility Lease
FEDERAL COST STATE COST LOCAL COST

:,::::,::,:::'::,F~::i:i:::::::
:':.:.;::ltQPQ.~Qgi:.:ili:,:::

$120,138 I

$120,138 I

$120,138 I

$360,414

$160,000 I

$160,000 I

$160,000 I

$480,000

$10,000 I $25,000 I $15,000 I

$5,500 I $25,000 I $5,000 I

$5,500 I
$25,000 ,
$5,000 I

$21,000 $75,000 $25,000

$20,000 I

I

I

$20,000

$20,000 I

$0 I

$0 I

$20,000

$30,000 I .

$5,000 I

$5,000 I

$40,000

$50,749 I

$12,500 I

$12,500 I

$75,749

$170,000 I

$170,000 I

$170,000 I

$510,000

i::::;:;:;:; },}{{:~:?}?}:::::::::::::::::::.::;:: .:;:;:::::::::::;::::

:.:.: ; :.:.:.:.:.: ';':':':':':':':':':':':::::::::::::::':::":':';:::::::::::::::::::::::::. ::::::::::::::::::::::~::.: ::;::: ..::::::':':":::':::':':':':',',

itV miti~g9.~~~f'j ttttt::~g;m!~t::v::v:::::::::::::~~q~~1:~~::: :','vvrrM;~g7M~:~t

I

$496,710

$402,510

$402,510

$1,301,730

$62,089 I

$50,314 I

$50,314 I

$162,716

$62,089 I

$50,314 I

$50,314 I

$162,716

DOT DISTRICT # 4

CONG. DIST.

21RDC

SWG

......

OPERATING ASSISTANCE SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5307

::::::::;:;':&9:gQ~I~:i::::ilitl;": ::*gQ9~~1:;'::::::;;:;;;I;lJ1'mlgg,1:;:::';;::;;;;;:; ::)(\::f::;;;:;;;;:;::iii::::m::::r:r::::::?::::::ffllt;9g;;;;;::;;,;,,;:r:::FYJPp;::::::;:::::::::::;;:;";;;:::;:;;::;:::::F!:;:P!i::::::::::::;:;:;:;::::;;I::::::::::::::':::::mgm~I@::::::;;;':::;

07/01/04- 06/30/05

$1,960,138

$1,960,138

07/01/05 - 06/30/06

$2,009,141

$2,009,141

07/01/06 - 06/30/07

$2,154,466

$2,154,466

N;::B:g~;:M!g9;;J*(q~n:::: ::::::::??t::::::::::::;::::::.::::::.,{:):,:::,:?:::.:.. . .. . ;: :;:: : :~1:~~9Qm:R!:: ': :::::m::':::::~~~QQ~~~!!':;: :;::: :::::::;:;~g;:1;~I~!ip:::::::':':::::::':::'::~B~!:g~~fA~::::

FEDERAL COST

$763,785

$795,339

$795,339

$2,354,463

LOCAL COST

$1,196,353

$1,213,802

$1,359,127

$3,769,282

DOT DISTRICT # 4

CONG.OIST.

21 ROC

SWG

N




CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM

::~~~:.:.:i:!:::::=~~:=:i::::ii!:I:

I

$500,000

Purchase New Vehicles (2 Trolley)

I

I

$500,000 I

I

PRQ4.$:Tp$1!: :::::::::::::::::::::::Imn;Tn~~Q,o;p.Qq:H:~1I.qP.;9QQI:::::::::\$.~Q(j,fM~T:

FEDERAL COST

I

$400,000 I

$400,000 I

$400,000 I

LOCAL COST

1

$50,000 I

$50,000 I

$50,000 I

STATE COST

I

$50,000 I

$50,000 I

$50,000 I

FY2005 Vehicles-(2) 12year buses for Fixed Route FY2006

Vehicles-(2) 12year buses for Downtown Shuttle FY2007

Vehicles-(2) 12year buses for Fixed Route

$500,000 :::$1;~Q;Q(j,Q:
$1,200,000
$150,000 $150,000

DOT DISTRICT # 4

CONGo DIST. # 2

21 RDC

SWG

CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5309

!Q!J.t~$..t}( \\F.!"\P'~::}

Albany Multi-Modal Facility

I

$1,250,000 I $1,250,000 I

$0 I $2,500,000

RRQ4$:Tp$[((::\::)\\\::():::::::\\::l:\ )::::::U;~~q;QQMt((J1;?~~;QQql:::ttt:::\\ :\~~q ::\\$?;?~MQ~:

FEDERAL COST

I

$1,000,000 I $1,000,000 I

$0 I $2,000,000

LOCAL COST

I

$250,000 I

$250,000 I

$0 I

$50,000

STATE COST

I

$0 I

$0 I

$0 I

$0

DOT DISTRICT # 4

CONGo DIST. # 2

21 RDC

SWG

CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5309

:effl?4.~r$t}r:

FEDERAL COST

LOCAL COST

w

STATE COST

DOT DISTRICT # 4

CONGo DIST. # 2

$368,347
)))):($~;~4t:: $294,678 $73,669 $0
SWG

CAPITAL SCHEDULE IN ALBANY FOR ELDERLY AND DISABLED Section 5310
::,:[f9QQPP4 i'i!! '!::::'::::!:!:!::lliqQQ~~4.i::::i:!! i /!!ii!wQ(!1iggl:::!:::!:::::!::

Purchase of Service
Purchase of Service
Purchase of Service
jt;,!iQ4PRll1Eyg:!:' :::::::::: : ...;.;.;.;.;.;.;.;.;.;.:.:.-.:.:.- :.: :.:::::::::::::::::::::::::::::::::::::::
FEDERAL COST STATE COST
DOT DISTRICT # 4

$37,181

I

$29,745 I

I

$7,436 I

CONG.DIST.

$39,040

$40,992

$37,181.00 $39,040.00 $40,992.00

$31,232 I $7,808 I

$32,794 I $8,198 I

21 ROC

$93,770 $23,443
SWG

~



TRANSPORTATION IMPROVEMENT PROGRAM

Operating Assistance for Non-Urbanized Area Transit - Dougherty County Section 5311

Operating Period
1/1/05 - 12/31/05 1/1/06 - 12/341/06 1/1/07 - 12/31/07
,ft:Qject.QJ)t Federal Cost (50%) Local Cost (50%)
DOT District # 4

TOOO706 FY05 68,140

TOOO968 FY~06
75,548

TO()120~
FyT07
86,748

T()tal
68,140 75,548 86,748

$~i8, 140 $34,070 $34,070

$I~,,i48,
$37,774 $37,774

$~,71' $43,374 $43,374

$2~Q&~6, $115,218
$115,218

CONG.DIST

2

RDC

SWG

Capital Assistance for Non-Urbanized Are Transit - Dougherty County

-

Section 5311

QR~till!!9g~j~io~
Description Shuttle Van (2) Shuttle Van/Lift (3) Shuttle Bus (2)

rI9()()l()2
FY05
$0 $0 $0

tJ::()Q()~'~ FYO~
$0 $0 $0

tr!l()i!~P! fXj9~1J
$ 95,000 $154,500 $105,000

TotaJ~
~WN.-w.w
$ 95,000 $154,500 $105,000

~.t9j~~tQ~~!

~~Q

Federal Cost

$0

~.~Q

/j;31,5I;;Pl.500
~;".'. -""-"~

~gf~J;~

$0

$283,600

$283,600

VI

State Cost

$0

$0

$ 35,450

$ 35,450

Local Cost

$0

$0

$ 35,450

$ 35,450

DOT District # 4

CONG.DIST

2

RDC

SWG

TRANSPORTATION IMPROVEMENT PROGRAM

Operating Assistance for Non-Urbanized Area Transit - Lee County Section 5311

pperatil!g {'ep!od
1/1/05 - 12/31/05 1/1/06 - 12/31/06 1/1/07 - 12/31/07
Project Cost Federal Cost (50%) Local Cost (50%)

~OO0706
'FY05 $ 53,068
$53,06~
$ 26,534 $ 26,534

1ll9009~
FY06'
$ 63,998
$3,~9.~
$ 31,999 $ 31,999

mpOl2()1i
~XW~
$ 68,145
$ 6?,145..
$ 34,073 $ 34,073

[\Qtats
$ 53,068 $ 63,998 $ 68,145
~1?5,2J!
$ 92,606 $ 92,606

DOT District # 4

CONG.DIST

2

RDC

SWG

Capital Assistance for Non-Urbanized Area Transit - Lee County Section 5311

Ppe.r~til!g~]>e.l'i()d [Q~~qiptio!!!

TOOO705 FY05

[.QQ(}2~J; t!tXO~

[QQ170Q
(JJ .Oh

tt:9i a ls,

Shuttle Van (1)

$0

Shuttle Van/Lift (1)

$0

$ 46,500

$0

$ 50,500

$0

$ 46,500 $ 50,500

~.foje~iCost

$~

Federal Cost

$0

State Cost

$0

Local Cost

$0

~'i~7.,OOQ

~g

$ 77,600

$0

$ 9,700

$0

$ 9,700

$0

$'9700d ,. ~,._.. ,.. ,..,J $ 77,600 $ 9,700 $ 9,700

DOT District # 4

CONG.DIST

2

RDC

SWG

0'\





ATHENS



OPERATING ASSISTANCE SCHEDULE FOR PUBLIC TRANSIT

Athens Transit System

FY 20052007 Transportation Improvement Program

SECTION 5307

.

I

I I I I I FY05*

FY06*

FY 07*

Total Cost

PI#

TOO0664

TOO0905

T001225

TOTAL PROJECT COST $ 3,511,101 $:;::$;$1$;~~Q $ 3,619,039 $ 10,643,770

TOTAL FEDERAL COST $ 477,000 }$:i!!i:$!14iPQQii $ 517,061 $ 1,496,061

LOCAL COST

$ 3,034,101 :$H::H$~QtMp.~Qii $ 3,101,978 $ 9,147,709

- NOTE: The funding source for each fiscal year is Title 49 USC 5307.

* Federal Operating Assistance Shortfall Supplemental Funds (federal funds not utilized by other transit systems in Georgia). These funds will be requested by The Unified Government of Athens-Clarke County. Supplemental funding is not guaranteed and should it not be available service cuts or local funding would be needed.

-....)

CAPITAL SCHEDULE FOR PUBLIC TRANSIT Title 49 U.S.C. Section 5307
AT AN 80% FEDERAL, 10% STATE, 10% LOCAL SPLIT Athens Transit System and Other Mass Transit
FY 2005-2007 Transportation Improvement Program

FY II 2005

2006**

2007**

PI#

FUNDING 49 USC 5307 49 USC 5307 49 USC 5307 49 USC 5307 49 USC 5307

PROJ. # I I I I I

CAPITAL ITEM / DESCRIPTION 30 ft. Transit Bus Vehicles 35 ft. Transit Bus Vehicles 40 ft. Transit Bus Vehicles Rubber Tired Trolleys
Demand Response Vehicle-Van

UNIT COST

TOTAL

*varies *varies "varies 275,000

$

s $ 520,000

1,040,000 $ 1,120,000 $

$ -s

-$

-$

$ 825,000 $

-$

-$

-
2,680,000
-
825,000

$ 75,000 $ 75,000 $ 150,000 $ 225,000' $

450,000

49 USC 5307

II

Capital Maintenance

n/a

$ 113,411 $ 136,063 $ 120,000 $ 369,474

49 USC 5307 49 USC 5307 49 USC 5307 49 USC 5307 49 USC 5307 49 USC 5307
*49 USC 5307

II

Replace Maintenance Equipment

II

Office Equipment

n/a

$ 25,000 $ 40,000 $ 40,000 $

105,000

n/a

$

- $ 10,000 $

-$

10,000

III

Supervisor Vehicle

IV

Upgrade Fareboxes

IV

Bus Washer

V

Contingency Funds - Section "9" Grant

n/a

$ 30,000 $ 60,000 $ 30,000 $

120,000

n/a

$

- $ 200,000 $

-$

200,000

n/a

$

-$

- $ 150,145 $

150,145

n/a

$

-$

-$

-$

-

TOmAWPP$l1JP.F:PRPJ.S.!$.) :::::/\"i }}}

)$::n$.~$AWt) )$':::)hP.4Q;Q9.${ )$))1~p.~QM4~J: )$': :::)4;~P~UM~::

(formerly Section 9)

FEDERAL COST

1,270,729

1,308,850

1,348,116

3,927,695

STATE COST

158,841

163,606

168,515

490,962

LOCAL COST

158,841

163,606

168,515

490,962

** Based on projected capital needs

00




CAPITAL SCHEDULE FOR PUBLIC TRANSIT Title 49 U.S.C. Section 5309
AT AN 80% FEDERAL, 10% STATE, 10% LOCAL SPLIT Athens Transit System and Other Mass Transit
FY 20052007 Transportation Improvement Program

FUNDING 49 USC 5309 49 USC 5309 49 USC 5309 49 USC 5309

PROJ. # I I I II

49 USC 5309

III

49 USC 5309

IV

*49 USC 5309/formerly Sec. 3

FY

2005

2006

2007

PI#

CAPITAL ITEM / DESCRIPTION

UNIT COST

TOTAL

*30-40 ft.Transit Bus Vehicles* - Section "5309" Grant *varies $ 500,000 $

-$

- $ 500,000

*30-40 ft.Transit Bus Vehicles* - Section "5309" Grant *varies $

- $ 500,000 $

- $ 500,000

*30-40 ft.Transit Bus Vehicles* - Section "5309" Grant Demonstration Project - Athens Multimodal Trans. Ctr.

*varies n/a

$

-$

$ 1,964,520 $

-$ -$

500,000 $ 500,000
- $ 1,964,520

w/connection to Rail to Trail oroiect ** PI# T001279

Demonstration Project - Park-N-Ride Lots PI# T00128 Contingency Funds - Section "5309" Grant

n/a

$ 3,376,518 $

n/a

$

-$

-$ -$

- $ 3,376,518

-$

-

:$::'::("$o:crOo.o : )()::::):::::::(mQT.At:c.p$inOF:BRQJ~C.t$::::,,:::,:,\:::{::,:(,::::::?: ($::5a41:0~e.

;:$(( :::\50.0.000. :($ (::::Q.:;$4XQ$.S:

FEDERAL COST

$ 4,672,830 $ 400,000 $ 400,000 $ 5,472,830

STATE COST

$ 50,000 $ 50,000 $

50,000 $ 150,000

LOCAL COST

$ 1,118,208 $ 50,000 $

50,000 $ 1,218,208

** See Section V-A 11 in 2nd Tier for project description of Rail to Trail Project.

\0

CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80/20 SPLIT ELDERLY AND DISABLED:
Title 49 USC 5310 (formerly 16 B . 2) FY 20052007 Transportation Improvement Program

I

I . I FY05

I I I FY06

FY 07 Total Cost

PI#

TOO0647 TOO0908 T001228

: :81K~g@.w.@g*~ :~::~:::i:g~;:9@j :.:.~::::::g@Qgj. ~~::~:~::::gj::;99@,:: ~:~~~:~Q@:99::::

FEDERAL COST $ 22,881 $ 24,025 $ 25,226 $ 72,132

STATE COST $ 5,720 $ 6,006 $ 6,307 $ 18,033

LOCAL COST $

-$

-$ -$

-

....
o




CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80/20 SPLIT

GENERAL PUBLIC DEMAND RESPONSE:

Title 49 USC 5311

FY 20052007 Transportation Improvement Program

CLARKE CO.

I

I I I I I FY05

FY06

FY07 Total Cost

PI#

TOO0701 TOO0961 TOO1194

: !1J%.~Q:e.~lli~~$i :::$:::""$!i;:~P~ $':;4p;~~~::: :~:;4R;~P~:::: :::~:::::::m~f;:m~p::

FEDERAL COST

77,600 $ 36,000 $ 36,000 $ 149,600

STATE COST $ 9,700 $ 4,500 $ 4,500 $ 18,700

LOCAL COST $ 9,700 $ 4,500 $ 4,500 $ 18,700

............

OPERATING SCHEDULE FOR PUBLIC TRANSIT AT SO/50 SPLIT

GENERAL PUBLIC DEMAND RESPONSE:

Title 49 USC 5311

FY 20052007 Transportation Improvement Program

CLARKE CO.

I

I I I I I FY05

FY06

FY07 Total Cost

FI#

TOOOO702 TOOO962 TOO1195

:e!Kmijia~i:~rQ~x :$lPffi;fl4p .::$:i=::tffi;PA4:::: :i::~:=:i::::~~M:P.4:::: ::~:::::~~P~;:$.Zp.:::

FEDERAL COST $ 53,723 $ 38,886 $ 41,576 $ ':34,185

STATE COST $

-$

-$ -$

-

LOCAL COST $ 53,723 $ 38,886 $ 41,576 $ 134,185

-IV


.'

ATLANTA



CAPITAL and PLANNING SCHEDULE FOR METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY Section 5307

" " " . ' . , . , . ~~,~~g$, ~~~::::~:~J::~:~:~:::::::::~:::::~Bt1])pf:::::::::::::~:::::~::~::~}\ FY07 .....'. . .

Tools and Equipment

:~::!:!n~g99$,~g:::~':~::::::::::::::::;r9pp~~$:::::::::~::::d:::::::::::::::m991:~~9:f@::}::

:"l;\)RHVH~grl:::l~B.tMt~!9f!8::~~:::~~~RBMi!~Ql.PP}

$873,000

$874,000

$874,000

$2,621,000

Security Equipment

$850,000

$850,000

$850,000

$2,550,000

Line Structure Rehabilitation/Renovation

$450,000

$500,000

$500,000

$1,450,000

Facilities Rehabilitation/Renovation

$475,000

$525,000

$525,000

$1,525,000

Environmental Rehabilitation/Renovation

$375,000

$375,000

$375,000

$1,125,000

Training

$75,000

$75,000

$75,000

$225,000

Preventive Maintenance

$33,325,405 $33,144,619 $31,866,660 $98,336,684

Bus Replacement Program

$950,000

$950,000

$950,000

$2,850,000

Transit Enhancements

$500,000

$500,000

$500,000

$1,500,000

ADA Paratransit Service

$4,608,000

$4,604,000

$4,463,000 $13,675,000

Q~p!:Mfe.tgJ~F~trnf?t:::~'::~::: :} '\:!::::::!:,,:::::::::,? r( /\::}$I:~;$$1;49?}~:::f::::~4~~~~fJpl~~~}:::$.4P.;~~~;pp9\ $125,857,684

TRANSIT PLANNING PROGRAM

$0

Regional Transit Planning

$800,000

$800,000

$800,000

$2,400,000

Short Range Transit Planning

$950,000

$950,000

$950,000

$2,850,000

Special Projects Planning

$950,000

$950,000

$950,000

$2,850,000

Long Range Transportation Planning

$900,000

$950,000

$950,000

. ::::: :i:t~ti~if:l1t~tiniftg;:e.tqgt~m@Eqt~r:~::'::::::::::::::L::/: : : :~::::i?:;~pp;999::~::~::~~~~?mppp:::: @:~:::~:':~:::~:~;~p;;pp:~:::

$2,800,000 $10,900,000

$0

EROJec.;r\c.O$m:~,:))f~:{{~)f:?:???/ {:: rru::~~I:~:::~:$.49;9~1,;4P.$.ul~::::~::::::$~9mI:7~91:~:::~I:::::::::::::f~;pg$:;P:p9:~J $136,757,684

FEDERAL COST

I $36,865,124 I $36,838,095 I $35,702,928 I $109,406,147

STATE COST

I

I

I

I

$0

I $9,216,281

$9,209,524

$8,925,732

DOT DISTRICT # 7

4,5,6, 131RDC

ARC

......
V-J

CAPITAL SCHEDULE FOR METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY Section 5309
';;;;;;=:.1r=tlll,:IJl:=::J;;~::~:::;~re:::o:

Station Rehabilitation/Renovation/Fare Collection M-AR-202

T001131

$5,250,000

$0

$0

$5,250,000

Preventive Maintenance

MtAR@9~:::i//tt:: XgP1:t~gi i:i:t?k

$500,000

$0

$0

$500,000

Rail Car Rehab/Retrofit Propulsion System

M-AR-211

T001133

$18,000,000

$0

$0 $18,000,000

Rail Car Procurement

MtARf4.9Q::::t::::t: XgP11~//::/:: $2,000,000

$0

$0

$2,000,000

Total

$28,250,000

$0

$0 $28,250,000

i.?!4~a$.ij9J;J.q~::f!~91mmK::::::::::::i::t:::':::::):':L::p:m!e!::,::ttf::::::::::::Xgp~~~~"::::':::'::::::::::i::::mg~@'9.~K::::m::,:::::t:'?mpp.J~~J:::::fti

Procurement of Clean Fuel Buses

MiARB:14.i i/::/::} XgQ?~~/://::'::}

$3,000,000

$0

$0

Totall

1

1 $3,000,0001

$01

$01

$3,000,000

R#.H::tM~h$.~i,V't~H~M::glq~!#H9'6.~:))):$:J:!p#::f::::)mt:):

North Line Extension/Railcars

INOT IN ARC TIP

::t)r.qQ.9?~Z)mttlt:))::]gOO~@'1r::::::):Ft:):::mQ.Q4~?gmf::::: $331,763

$331,763

~gA~i.;'TI~}}t::::::::\:::::t:::: :::::::::::,,:it::::)'}fffW\,::t:)::::::::;:
FEDERAL COST STATE COST LOCAL COST
DOT DISTRICT # 7

:?')$9.)t;p~

$24,865,410

$2,100,000

$4,116,353

$01

4,5,6, 131RDC

r:mf:$.~1W~~t;:t~
$0 $24,865,410 $2,100,000
$01 $4,116,353
ARC

....
~




OPERATING ASSISTANCE SCHEDULE FOR NONURBANIZED AREA TRANSIT (Atlanta Area) Section 5311

qQqNmx:\I$.m!ed~..:':::::::::::)))UIA.RQimI.P#} \UI\FYfQ$ ii:iii:U::li:::iii::::::iffiMiP~i::\\\I\ '::i::::i::::ffiMi:P7iUi::::::::::::::I:::::::U: TOTAL.:ii::::

Cherokee 1T000710

AR-CH-5311A

T000972

T001205

Canton 1T000710

AR-CH-5311 B

T000972

T001205

Henry

1T000704

AR-HE-5311B

T000966

T001199
i9rrAl#:g$.1[$i(ii)):'( ::::\..:::://\::<:.

FEDERAL COST (50%)

LOCAL FUNDS (50%)

$344,195

$344,195

$385,126

$385,126

$405,470

$405,470

$134,052

$134,052

$159,501

$159,501

$166,050

$166,050

$405,064

$405,064

$425,236

$425,236

$445,928 I

$445,928

. . . . . .; )$:f4~~~$~]:( }::::{\$Mq~~~gi]}U:m:::::::ii}$~$1j~~~::::I:::::::}:::::::$4;7q~~fg:::

$374,6301

$405,181 1 $425,6991 $1,435,311

$374,6301

$405,181 1 $425,6991 $1,435,311

CAPITAL SCHEDULE FOR NONURBANIZED AREA TRANSIT (Atlanta Area) Section 5311

QQQNJ?fht:4PJ;$PR1RJ.1QN :)t i: ::ttIARQiTIBU(i:iiii/' ::i:ii((F)Q~(:(ii:::lt::t::F]).:t:)::i::::::I::::::::::::t:::F~rV::)::::::::::l::::))i,(mOmAt/\i\\

STIP #

IAR-CH-5311 C

Cherokee IShuttle Buses with lift

T000709 I T000971 I T001204
$111,ooo-T-$O- 1$57,500

$168,500

Shuttle Buses Two-way Radio

$50,500 1 $103,000 1

$0

$500 I

$0

I

$0

$153,500 $500

Canton ISTIP #

IAR-CH-5311D

T000709 I T000971 I T001204

Shuttle Buses with lifts

$0

1 $56,500 1 $57,500

$114,000

Shuttle Buses

$0

1 $51,500 1

$0

$51,500

Two-way Radio

$0

1 $100 1

$0

$100

STIP #

IAR-HE-5311A

T000703 I T000965 I T001198

Henry

IShuttle Buses with lift

$204,000 1 $52,000 1 $106,000 1 $362,000

Wptr*.PXJQiW@""':::t::::::,/')":tr:':r'tif:', "'3;::::;::::::::::

":::f::~$~~HqQP:::::t::::I::::::::::::::~g~;,:qQf'::f:I::::tf~g~:tmqQ\:t:'::I':::\:'::'~~$P;:tP:QJt:'t::

.....

FEDERAL COST (80%)

VI

STATE FUNDS (10%)

LOCAL FUNDS (10%)

$292,800 1
$36,600 1
$36,600 -I

$210,480) $26,310 1 $26,310 1

$1'16,8-00- 1 $680,080

r-- $22,100 I $85,010

$22~nfd--

-$85,010

CAPITAL SCHEDULE FOR ELDERLY AND PERSONS WITH DISABILlTI'ES ATLANTA AREA Section 5310

:P.PQNmv'/j) ST:IPW#) ( ::,:::: i ARCnp#/// ( ::EYj~PQ$/) :':FY:~QQ~) :":j')PY/,2QQ:V/ :'/: )j:j'))SfP:1Att :,:,:"

Cherokee

T000591

AR-CH-5310

$28,601

T000988

$30,031

T001271

$2,1,533

$90,165

Clayton

T000592

AR-CL-5310

$45,762

T000989

$48,050

T001272

$E;0,452

$144,264

Cobb

T000593

AR-CO-5310

$120,124

T000990

$126,130

T001270

$132,437

$378,691

Dekalb

T000594

AR-DK-5310

$183,046

T000991

$192,199

T001268

$201,809

$577,054

Douqlas

T000595

AR-DO-5310

$20,021

T000992

$21,022

T001273

$22,073

$63,116

Fayette

T000596

AR-FA-5310

$20,021

T000993

$21,022

T001274

$22,073

$63,116

Fulton

T000597

AR-FN-5310

$248,829

T000994

$261,270

T001269

$274,334

$784,433

Gwinnett

T000598

AR-GW-5310

$80,083

T000995

$84,087

T001275

$88,291

$252,461

Henry

T000599

AR-HE-5310

$22,881

T000996

$24,025

T001276

$25,226

$72,132

Rockdale

T000600

AR-RO-5310

$14,300

T000997

$15,016

T001277

$1(;,766

$45,082

b:m=P=:r.A=;.:ti=)P=:W=.$=;n=m:_'j:j::/'m:$.Z$$."l:igja :;:::j:::::::;:;::::':':;:$.$.2g;a$.2)m:;//:;:;/I$el:i~Hm.>';:;'m:;:;';:;:$.Z4.1o.~$.t4:

FEDERAL COS~

$626,934

$658,282

$691,195

$1,976,411

-0"1

STATE FUNDS (20%)

$156,734

$164,570.

$112,799

$494,103




::::;:::;::~:~:~:~:~:~;~:~:~:~:~:~:~:::::::::.: .........:...::;:::::::::::;:;:::::.:.....

BARROW
BARTOW PJ1F't~rHf\NmQN(( CHEROKEE CLIFTON CORRIDOR TMA
- l,;UWETA
I-AYETTE
-FORSYTH
\,jRTA
-HALL
Ht:NRY
- NEWTON
t""AULDING
- ROCKDALE
~)t""ALDING

T001410 T001400 T001401 T001402 T001403 T001404 T001405 T001406 T001407 T001408 T001409

.1:;tt~Q~WE~1!m~:I:~~g:;~411}~~~;~g$:
Transit Facilities I $34,773 I $34,824 Transit Facilities I $30,641 I $30,686
Tt?h$.Jtlt@nlt@$::I:~g91@~li(i~gB?i1@~:
Transit Facilities I $234,800 I $235,139

Transit Facilities $1,157,534 $1,149,624

Transit Facilities $101,071 $101,219

Transit Facilities $312,271 $312,729

Transit Facilities $255,825 $256,200

Transit Facilities $2,303,561 $2,288,356

Transit Facilities

$20,145

$20,174

Transit Facilities

$349,131

$349,643

Transit Facilities

$149,991

$150,211

Transit Facilities $210,700 $211,009

Transit Facilities

$260,071

$260,451

Transit Facilities $170,880 $171,130

:eBigg;Hm::RQ$:1:::::::~~;1$7;9g?1~~n~~t~~$~:::

FEDERAL COSl $4,925,620 I $4,910,286

STATE COST I

$0 I

$0

LOCAL COST I $1,231 ,405 I $1,227,572

--...J

$3,566,164 $304,851 $941,874 $771,620
$9,406,306 $60,760
$1,053,051 $452,405
. $635,514 $784,426 $515,409 1::::::~gQ;:9:~g;:QYW::l $16,881,553 .
$0 $3,513,518

CAPITAL SCHEDULE FOR CLAYTON COUNTY Section 5307

]:'::::'::::::Blt:P::jj:j:::"j::::,::j':ffiKOS:)'::" '(::/::://FY1Q1i:::::::::jjj::j':jjl'

!!!!!~lli~~~~ii:!:!;;:~ilil~i::~~!.i:i=il~~=:iil!!!!1

Transit Facilities

I $1,632,711

$1,632,700

$1,678,940

:::RRQ,~B*:::Hgm:::::jj::::jjj:::fj:j:::~m::mm:j:;:;1':::::]:::):I::I::::::~n:::::mj::::j:j::j:j:jjjjj:j::::j:j:j:::]::::j::j::j:j::jj::~W;9~:~;i11:jljjj:::j::j:jj:::j::11~ggrr.9Pll::j:jj:j::jj::::jj:~lt~7~&197:

FEDERAL COST

I $1,306,169 I $1,306,160 I $1,343,152

STATE COST

LOCAL COST

$326,542

$326,540

$335,788

$4,944,351 $4,944,351 $3,955,481
$0 $988,870

DOT DISTRICT # 7

CONG.DIST.

5,13 I ROC

ARC

.....
00




CAPITAL SCHEDULE FOR COBB COMMUNITY TRANSIT Section 5307

PI::SCRIPTI~Qti!;;\~.... :. STIP#

/~jK;;',,,

ARC TIP#

Park and Ride Lots

Transit Center

Support Vehicles

Bus Stop Improvements

Transit Planning Program

Computer and Computer Related

Education/Training

Preventive Maintenance (including upgrades)

Capital Projects: Bus Replacement

Capital Projects: Paratransit Vehicle Replacement

Fare Collection System

Capital Projects: ATMS and Related Equipment

Capital Projects: Paratransit Operations

PROJECT COST

.,,'.

FEDERAL COST

STATE COST

LOCAL COST

FY05 TOO0583

'j;>FY06 ..... '.z-"'. ".. ,-",. :~:;,:,;.,}',~. ::.:-;.,{~," ..-.-.',. ,., ~~ -.,'-,
,...QOO934 "'.:, .. .-. , :~:', "',*',y,'<>$,,.,~.---_

AR-CO-5307A AR"CQ:-5307A

$0

$80,000

$50,000

$150,000

$160,000

$0

$25,000

$983,677

$90,000

$300,000

$0

$100,000

$10,000

$15,000

$2,000,000

$2,100,000

$2,673,929

$850,000

$600,000

$600,000

$25,000

$250,000

$0

$200,000

$627,000

$625,000

$6,260,929

$6;253,677

$5,008,743

$5,002,942

$626,093

$625,368

$626,093

$625,368

FYO':-' _>;:f:~"iiNfi>--<,-_,'_'
'f(fn~~~7
AR-CO-5307A $100,000 $200,000 $400,000 $351,144 $325,000 $100,000 $20,000
$2,200,000 $0
$850,000 $250,000 $874,428 $630,000
$6,a;t"fo572
$5,040,458 $630,057 $630,057

fOfA6,.:l~
';::471
/;,04
$180,000 $400,000 $560,000 $1,359,821 $715,000 $200,000
$45,000 $6,300,000 $3,523,929 $2,050,000
$525,000 $1,074,428 $1,882,000 $18,815,178 $15,052,142 $1,881,518 $1,881,518

DOT DISTRICT # 7
-1.0

CONG.DIST.

5,6,11 ROC

ARC

CAPITAL SCHEDULE FOR DOUGLAS COUNTY Section 5307

: !!::::::::~m?~~!:::::??~ ~~:::::::~~::~;~~:::Fm::~~.:~.::.::??::;::~;:::::fl19:~~;:::~:::~:::::::::::~:::~:~:::~::::~:::::ill!ill~g:?{

: : : impq,Q$~~::::::::::::::::::::::::~::::::~:mgqQ~2&.::::::::::::::::::::~::::::::::~~~::ig~;~:~~~~:::::::::~::J

::8~%QQi~:i)7:A .~Btggeggi~~:::~::::~Ecj?gt?B9t~::::

Transit Facilities

I

$589,682

$588,399

$617,060

:::gmQ4p.m:::~@::::::::::::::::::::::?::::::::::::::iii:::::::::: :::::::: ::::::::::::::::::::::::::::::]:::::::::~:::::~:::::i:R~~~~~gB:::::::::~:~:::::~:::::~?~~;~~~t_::::: ~;1fi;:gg

$1,795,141 $1,795,141

FEDERAL COST

I

$471,7461

$470,7191

$493,648 $1,436,113

STATE COST

I

$58,9681

$58,8401

$61,706

$179,514

LOCAL COST

I

$58,9681

$58,8401

$61,706

$179,514

DOT DISTRICT # 7

CONGo OIS1. 13, 11

ROC

ARC

oN




CAPITAL SCHEDULE FOR GWINNETT COUNTY Section 5307

:::::::::Ex])$:wlP::::::::::::FQ::::::::::,n::::::::::f:tt::~tN::::'::::::::::::U

:::: ::mQQQ~$i.:1*0HtQQQ~~1:::::I:::::::LQQ1g;~]:m

::p;;rW+$~QiAI:'8B;;wi$,~Qt~:Iw;m.t~\(\(~?9.7A:

Transit Facilities

I $6,570,716 I $6,721,817 I $6,334,978 $19,627,511

!ie"q~I$QmH~Q$.mm:!ii:i::<:':</<,::,:(I::I:i~~;$7P;71~]:,:,:,~~7g1;~1t:l@:::::$~;~~4J~!~' $19,627,511

FEDERAL COST

I $5,256,573 I $5,377,454 I $5,067,982 $15,702,009

STATE COST

I

$657,072 I

$672,182 I

$633,498

$1,962,751

LOCAL COST

I

$657,072 I

$672,182 I

$633,498

$1,962,751

DOT DISTRICT # 7

CONGo DIST.

7,10,13 I RDC

ARC

,N....

CAPITAL SCHEDULE FOR GWINNETT COUNTY Section 5309

DESCRIPTION
StIP#3F[ ',;:0;'

.

-v ,

y

Gwinnett Bus Maintenance Facility (Land

Purchase & Construction)

,PROJECT COST

FEDERAL COST

STATE COST

LOCAL COST

FY04 TOO0245
$495,015 $495,015 $396,012
$49,502 $49,502

FY05
>i: "
$0 $0 $0 $0 $0

FYO'6
}':
""

' TOTAL

'N

'

"<r";

$495,015 $495,015 $396,012
$49,502 $49,502

DOT DISTRICT # 7

CONG.DIST.

7,10,13 ROC

ARC

tv tv


I....'''

.'

AUGUSTA



TRANSPORTATION IMPROVEMENT PROGRAM

FY 2005 2007

PROJECT DESCRIPTION:

CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80110110 SPLIT

AUGUSTA PUBLIC TRANSIT

FUNDING

PI#

SEC 5307

N/A

SEC 5307

N/A

SEC 5307

NfA

SEC 5307

NfA

SEC 5307

N/A

SEC 5307

NfA

SEC 5307

N/A

SEC 5307

N/A

SEC 5307

N/A

SEC 5307

N/A

SEC 5307

N/A

SEC 5307

N/A

SEC 5307

NfA

SEC 5307

N/A

SEC 5307

N/A

SEC 5307

NfA

TIP # TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229 TOO0648 TOO0913 T001229

PROJECT# N/A N/A N/A N/A N/A NfA N/A N/A N/A N/A N/A N/A NJA N/A NJA N/A

CAPITAL ITEMIDESCRIPTION 2 Transit Vehicles <30ft 5 Paratranslt Vans 1 Small Truck 1 SUV
Preventive Maintenance Tire Leasing
ADA Expenses Shop Equipment Security/Surveillance Cameras Management Training Braille Embosser Braille Translation Software Paratranslt Certification Software Mobile Data TermlnallAutoVehicleLoc. New Phone System Rehab/Renovate APT Facilities

UNIT COST $250,000 $50,000 $15,000 $40,000 Varies Varies Varies Varies $10,000 Varies Varies Varies Varies Varies Varies Varies

FY05 $500,000
$15,000
$900,000 $27,500
$250,000 $12,500 $10,000 $25,000 $5,400 $4,300 $55,200
$181,700 $33,000

FY06 $50,000 $40,000
$900,000 $250,000
$25,000
$1,500,000

FY07

TOTAL
$500,OO~

$200,000

$250,000

$15,000

$40,000

$900,000

$2,700,00

$27,500

$55,000

$250,000

$750,00

$12,500

$25,000

$10,000

$25,000

$75,000

$5,400

$4,300

$55,200

$181,700

$33,000

$1,500,000

SEC 5307

N/A

TOO0648

NJA

Construct Transfer Center South Augusta Varies

$1,000,000

$1,000,000

TOO0913

T001229

SEC 5307

N/A

TOO0648

N/A

Contract Contingencies

Varies

5100 e80

5188250

570750

535998

TOO0813

T001229

I"RQ'Je:C; f;:;$:T::::: :::::::::::;::::::::::::::::::::::: ...;.:.:::.::..:..:.:.: :;::::::::: ::::::::::::::: ::: :::::: :~;1

;.

:U

; ;::: : :.0,

FEDERAL COST

$1,696,464.0 $3,162800.0 51,188,600.0 $6,047 664.0

tv
(,;.)

STATE COST LOCAL COST

$212,058.0 $212058.0

$395,325,0 $385325.0

$148,575.0 $148575.0

$755,958.0 $755858.0

DOT D/STRICT#:

2 CONGoD/ST.: 8& 12

ROC:

CSR

TRANSPORTATION IMPROVEMENT PROGRAM

FY 2005 . 2007

OJECT DESCRIPTION:

OPERA TlNG ASSISTANCE SCHEDULE FOR PUBLIC TRANSIT

RURAL RICHMOND COUNTY

OPERATING PERIOD
FISCAL YEAR 2005

TIP# :1 FUNDING II OPE~;ING
T000673 I SEC 53111
TOOO964 TOO1197

FY 005 $143,147

FY 2006

FY 2007

TOTAL $143,147

FISCAL YEAR 2006

T000673!SEC 5311
TOOO964 TOO1197

$152,214

$152,214

FISCAL YEAR 2007

TOOO673 TOOO964 TOO1197

SEC 5311

$159,614

$159,614

IDOTDISTRICT #

2

ItONGRESSIONAL DISTRICT #

N
~





TRANSPORTA TlON IMPROVEMENT PROGRAM

IPROJECT DESCRIPTiiiN;-

I

FY 2005 - 2007

'CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80110110 SPLIT

AUGUSTA PUBLIC TRANSIT

PITAL ITEM/DESC Transit Vehicles

'NIT COST Varies

Y05 II FY06 I

$500,000 I

I

FY07

I TOTAL I

I

$500,000

I SEC 5309 I N/A I T000649I N/A TOO0914

T001230

~

I

SEC 53091 N/A I TOOO649l

N/A

I

TOO0914

TOO1230

Transit Vehicles Transit Vehicles

I Varies I

I

I

I I Varies

I

$500,0001

I

I

I

I

I

I

$500,0001

$500,000 $500,000

e~T:c.Q.WIDI"'?::i::::{})):):)}::
FEDERAL COST STATE COST LOCAL COST
OT DISTRICT #:

$400,000.00 $50,000.00 $50,000.00 9 & 12

)QQ~l)o.l~Qo.~o.Q();@1

$400,000.0011 $1,200,000.001

$50,000.0011 $150,000.00

$50,000.0011 $150,000.00

RDC:

CSR

N VI

TRANSPORTATION IMPROVEMENT PROGRAM

FY 2005 2007

PROJECT DESCRIPTION:

CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80110110 SPLIT

RURAL RICHMON> COUNTY

SEC 5311

TIP # PROJECT# II CAPITAL/TEM/DESCRIPTION IIUNITCOsir--FYos:]1 FY06 I FY07 I TOTAL I

1 Shuttle Bus and Mobile

N/A T000672 N/A I

Radio

T000963

$52,500

$52,500

$52,500

T001196

SEC 5311

N/A T000672

N/A

T000963

T001196

SEC 5311

N/A T000672 T000963
T001196

N/A

2 Shuttle Buses and 2 Mobile

Radios

I $54,500

$109,0001 $109,000

$0.00 $42,000.00 $87,200.00 $129,200.00

$0.00 $5,250.00 $10,900.00 $16,150.00

LOCAL COST

II

$0.00 $5,250.00 $10,900.00 $16,150.00

IV

[DOT DlTRICT # : - - - -

2 __~ICONG~ DISL 9 & 12 '-R15C-:-

CSR I

0\



...........................

..

'

,

TRANSPORTATION IMPROVEMENT PROGRAM
FY 2005- 2007
PROJECT DESCRIPTION: OPERATING ASSISTANCE SCHEDULE FOR PUBLIC TRANSIT

RURAL COLUMBIA COUNTY

OPERATING PERIOD
FISCAL YEAR 2005

TlP#

FUNDING

I

I

I

TOO0673 SEC 5311

TOOO964

T001197

OPERATING CAP

II

FY 2005

II

FY 2006

II

FY 2007

I TOTAL
II

$107,595

$107,595

FISCAL YEAR 2006

TOOO673 TOOO964 TOO1197

SEC 5311

$114,282

$114,282

FISCAL YEAR 2007

TOOO673 TOOO964 TOO1197

SEC 5311

$116,992 $116,992

p.RQUeCT:CQST:;/ ;;::;};:::(::::: ::::;:))$1(tiI5~$ ?;;;;;:;:??$W~4a.~~ ;::);:::;::;;;)$iM~r~~~ ;?:::):;:?$a~~::~~s:

FEDERAL COST

$51,154

$56,587

$59,699 $167,440

LOCAL COST

$51,154

$56,588

$59,699 $167,441

SUPPLEMENT IDOT DISTRICT #

$0

$0

$0

2

I CONGo DISTRICT #

$0 9

tv
-....J

TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 2007
PROJECT DESCRIPTION:
CAPITAL SCHEDULE FOR PUBLIC TRANSIT A T 80/10/10 SPLIT RURAL COLUMBIA COUNTY

FUNDING

II PI#,I TIPtf,IPROJECT#11 CAPITAL ITEM/DESCRIPTION II UNITeaST II FY05 II FY06 II FY07 II TOTAL

1 Standard Van and 1

I I SEC 5311 I N/A IT000672 N/A

Mobile Radio

I $29,500 I $29,500 I

I

I $29,500

TOO0963

T001196

SEC 5311

I N/A T000672I N/A
T000963
T001196

SEC 5311

I N/A T000672/ N/A
T000963
T001196

STATE COST LOCAL COST DOT DISTRICT#:

$2,950

$2,950

2

IICONG.DIST.:

$0 $0 9

$0 $0 ROC:

$2,950 $2,950 CSR

N 00




TRANSPORTA nON IMPROVEMENT PROGRAM

FY 2005 2007

PROJECT DESCRIPTION:

CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80120 SPLIT

RICHMOND CO. SERVICE AGENCIES

FUNDING SEC 5310

PI#

I TIP # I PROJECT # II CAPITAL ITEM/DESCRIPTION I UNIT COST I FY05

N/A

TOO0650

N/A

For Purchase Of Services

$74,363

TOO0915

T001231

FY06

FY07

TOTAL $74,363

SEC 5310

N/A

TOO0650

N/A

TOO0915

T001231

For Purchase Of Services

$78,081

$78,081

SEC 5310

N/A

TOO0650

N/A

TOO0915

T001231

For Purchase Of Services

$81,985

$81,985

PRP4J;CTCP$.T::= ::=:,,::=)?: :)r) :":,:\,:,i, r:=( :=:':"$!4;1!&:~~QQ

rEDERAL COST

$59,490.40

STATE COST

$14,872.60
I

IDOT DISTRICT #:

2

IICONG. DIST.:

.7~;Q.$tW.Q '::r$at'9.$~Qq: ::=$~~4~;Qij
$62,464.80 $65,588.00 $187,543.20 $15,616.20 $16,397.00 $46,885.80

9 & 12

RDC:

CSR I

tv
\0

'.

BRUNSWICI(



OPERATING ASSISTANCE SCHEDULE FOR BRUNSWICK MPO Section 5307

STIP# ;;2 OPERATING PERIOD

TQ,Q0651

\

' ;"

FY05

TOOO916
,rv os
,

ti'OO123? ,,,,-=.. __,,__ ,~>_._,_"_,_: c__,, .. . . . . . . . ,:: ..

i;;:,

':>:"~-fV: Y., ,. -' ........ -~:~Sy!'

. FY07

";

"\

,>,;;;'C' " i ;

TOTAL

July 1, 2004 - June 30, 2005

$0

$0

July 1, 2005- June 30, 2006

$513,952

$513,952

July 1, 2006 - June 30, 2007

$513,952 $513,952

,PRQJECT;I"COS""fi;;\

,.,c- "......

.. .. :"Y~:...

..": : <

FEDERAL COST

LOCAL COST,

:~! ,'~~t;1

;'~J

"!I~O

;):$513:~52

;;;li:;;14$1513','952; ' "")X:.':." c. ~;:::"d':~,,__ '

~\$1lQ~7,904i

$0 $218,798 $218,798 $437,596

$0 $295,154 $295,154 $590,308

DOT DISTRICT # 5

CONGo DIS.

1 ROC

CG

ow

CAPITAL SCHEDULE FOR BRUNSWICK MPO Section 5307

DESCRIPTION

,<'-',-' ~" , - -.:-:>,

'0

<,5TIP#

FY05 T000652,

FY 06;;
V'ifFf
TOO0917

~"FY 07

~~~,-~,

w

'001233,

TOT~L

"',

""

Facility Leasing Three 30' Transit buses Office Equipment Two Vans Capital Maintenance Continqencv

$0

$33,926

$33,926

$67,852

$0 $169,600 $169,600 $339,200

$0

$0

$0

$0

$0

$45,074

$45,07'4

$90,148

$0

$11,200

$11,200

$22,400

$0

$17,074

$17,07'4

$34,148

PROJECT COST , FEDERAL COST LOCAL COST STATE COST

$0 $276,874 $276,874 $553,,748

$0 $221,499 $221,499 $442,998

$0

$27,687

$27,687

$55,375

$0

$27,687

$27,687

$55,375

DOT DISTRICT # 5

CONG.DIST.

1 ROC

CG

.w....





CAPITAL SCHEDULE FOR BRUNSWICK MPO Section 5310

'sTip #",,,
5310 Proaram Services

$31,461

$33,034

$34,686

$99,181

FEDERAL COST LOCAL COST STATE COST
DOT DISTRICT # 5

$25,169

$26,427

$27,749

$6,292

$6,607

$6,937

CONG.D1ST.

1 I ROC

$79,345 $19,386
CG

W
N



COLUMBUS



CAPITAL SCHEDULE FOR COLUMBUS TRANSIT SYSTEM

Section 5307

~=~= ::rt .FY06 iI(( iii mq~Q~j~>::i

:;:::::::~:.;~~~:::ii::::_

Preventive Maintenance

$447,020

$469,370

$492,839

$1,409,229

Tire Leasing (Tires, Tubes, Materials)

$60,000

$63,000

$66,150

$189,150

Engine Rebuild Program

$80,000

$84,000

$88,200

$252,200

Transmission Rebuild Program

$60,000

$63,000

$66,150

$189,150

Bus Stop Signs, Poles, Benches and Trash Cans

$15,000

$15,300

$15,610

$45,910

Paratransit Operations

$0

$52,000

$52,000

Training

$0

$32,000

$32,000

Lights at Body Shop (Upper Shop Pits)

$8,000

$8,000

Security Cameras for Buses (15)

$40,000

$80,000

$120,000

Low Profile Axle Jack Air Powered (1)

$1,200

$1,200

Automatic Announcement System (20)

$95,000

$95,000

Swipe Card Ticket Vending Machine (1)

$60,000

$60,000

Golf Carts (2 or 3)

$28,240

$28,240

Mini Bus w/Camera (1)

$180,000

$180,000

35' Low Floor Bus w/Camera (4)

$0

$269,695

$833,360

$1,103,055

Parts Room Shelves/Utility Shelves

$8,500

$8,500

Lockers for Shop (Uniforms)

$4,000

$4,000

Service Vehicle

$25,000

$25,000

Construction Storage (ADA)

$0

$64,750

$64,750

Facilities equipment
a erational E ui ment

$0

$4,750

$30,000

$34,750

$0

$73,750

$130,000

$203,750

. ( (:t:~jHj1:;~~ij:: ::::%:11;iii;~1:~::: ::::::::::::::::~:j~1~~;~P~:: ::::::::::14a~.;~#:

FEDERAL COST

$889,568

$1,017,292

$1,377,847

$3,284,707

STATE COST

$111,196

$127,162

$172,231

$410,588

LOCAL COST

$111,196

$127,162

$172,231

$410,588

ww

DOT DISTRICT # 3

CONG.DIST.

2,3 RDC

LC

CAPITAL SCHEDULE FOR COLUMBUS TRANSIT SYSTEM Section 5309

~(ll:~1!~ii"i !=ji;;::!"%~ ;ii{~ ~=~

30 Ft. Transit Coaches (3 <30 Ft. Transit Coaches (2)
FEDERAL COST LOCAL COST STATE COST

$750,000 $250,000
}" J1;ppgl9QQ
$800,000 $100,000 $100,000

,,~i,;:mlilll_wiitili!

$0

$01

$750,000

$250,000
':::":::::::::~:~:::::i1~~Q9P~g~P

$0

$0

$800,000

$0

$01

$100,000

$0

$01

$100,000

DOT DISTRICT# 3

CONG.018T.

2,3 I ROC

LC

w
~



CAPITAL SCHEDULE IN COLUMBUS FOR ELDERLY AND DISABLED Section 5310

Purchase of Service Purchase of Service Purchase of Service
FEDERAL COST STATE COST
DOT DISTRICT # 3

$74,363

$74,363

$78,081

$78,081

$81,985

$81,985

$.:7~;~~~$:?~;Q~1 .$::.:::::::.i1;~~~:::{:\ ::.::$.l?~4~i~~

$59.490

$62.465

$65,588

$187,543

$14,873 I

$15,616 I

$16,397 I

$46,886

CONG.DI5T.

2,3 I ROC

LC

w
VI



GAINESVILLE



ACCESS TO JOBS FOR GAINESVILLE SECTION 3037

DESQ,RIPTIQ,N.
STIP;#

",'
'i>" ' ;~:~"

F't:",Q

FYQ6

~;/}{&')-1' , ;'.<: I" ,,"m",,'

TOOO674

TOQ0944

FY07', rqTAL

;<'::::::t\,,' _ ,-,'::%$'4';}0;
,;]1001253

~

4:':);~"

"'"

Access to Jobs/Reverse Commute Program

$400,000 $400,000 $400,000 $1,200,000

TOTAL

\+\

Federal

State

Local

DOT DISTRICT # 1

>:"il))

;:

$~QO,()O()~ I~ $4Q'Q';()()O

i$4()O'06'f)y "..

., .... -.;::-,

$f2, 0,;(.").',oM

$200,000 $200,000 $200,000 $600,000

$0

$0

$0

$0

$200,000 $200,000 $200,000 $600,000

CONG.DIST.

4,6,11 ROC

ARC

UJ
0\

OPERATING SCHEDULE FOR PUBLIC TRANSIT AT SO/50 SPLIT

GENERAL PUBLIC DEMAND RESPONSE:

Title 49 USC 5311

FY 2005-2007 Transportation Improvement Program
HALL CO.

FY 05

FY 06 FY07 Total Cost

PI#

TOOO0702 TOO0962 T001195

F';~OJEGT co,t

$i:;

'$1,1S~22 "$,i~~6, 352,462

,;-jtff! ' , .' ;a~;~~;d
$'.$96,2"12

41"S,,1

FEDERAL COST $ STATE COST $

176,231 $ 198,121 $ 208,209 $ 582,561
-$ -$ -$ -

LOCAL COST DOT DISTRICT 1

$ 176,231 $ 198,121 $ 208,209 $ 582,561

Cong.Dist. 4,6,11 ROC

ARC

VJ
-....l




Federal State Local DOT DISTRICT# 1

GAINESVILLE SECTION 5307 OPERATING

iiiiiiii~I~~~ ill:!!:l!:

$201,971

$201,971

$605,913

$100,986 $0
$100,986 CONGo DIST.

~~~1i~~~1::H:i:iiii.i.iii;.14:1~~1\~iiil:i:.:: ::: .:$~g$;~1~

$100,986

$100,986

$302,957

$0
$100,986 I

$0 $100,986

$0 $302,957

4,6,11 I ROC

ARC

w
00

CAPITAL SCHEDULE FOR PUBLIC TRANSIT AT 80/20 SPLIT

GENERAL PUBLIC DEMAND RESPONSE:

Title 49 USC 5311

FY 2005-2007 Transportation Improvement Program
HALL CO.

FY05

FY 06 FY 07 Total Cost

PI#

TOO0701 TOO0961 T001194

PRQJECT COST FEDERAL COST

$0 $ 138,QQO $ ~~,OOQ( $,aG3;!,QQO
- $ 110,400 $ 75,200 $ 18fi,600

STATE COST $

- $ 4,500 $ 4,500 $ H,OOO

LOCAL COST $

- $ 4,500 $ 4,500 $ H,OOO

DOT DISTRICT 1 Congo Dist 4,6,11 RDC

ARC

w
\0




SECTION 5307 CAPITAL GAINESVILLE

<;, i + : / . J \ i

"

c,

DESCRIPTION.

;;.

<i....1. \. iii

.

, ii""i'lf" .. t( ,;~, .'(

51=IP #.

'1" "*

''1-''"

V"

,
'f ""i'

<. t 't <. ....'1-'. ".1 i .': .. i"

"'i' :" .,c',' .<:.. 'ii

' FY05

;FY06 ,FY07'

..' " +i,i

<t' ','~j 'I, .+ 'iF ''',

1+ " ' , , 9 ..

.: i TOO1258(( :; 11001259 "TOOj1,260 Ii..

'" ' / ..' .:,c.
TOTAL

Purchase Four (4) Twenty-five foot Expansion Vehicles

$565,300 $565,300 $565,300

$1,695,900

Fare Boxes

$180,000 $180,000 $180,000

$540,000

Shelters

$20,000 $20,000 $20,000

$60,000

Shelters

$60,000 $60,000 $60,000

$180,000

Shelters

$20,000 $20,000 $20,000

$60,000

Signs

$2,500

$2,500

$2,500

$7,500

Brochure Holders

'F' 'i,_

,

Total

Federal

.,....., .....
'I' """
j '.

$2,000

$2,000

$2,000

$6,000

"Tt V

,

<$~~9't800 '$8~g8Bdo .p ~8~9;86p IF

, $2,~4g:;490

"

.1..: _._,

$679,840 $679,840 $679,840

$2,039,520

State

$84,980 $84,980 $84,980

$254,940

Local
DOT DISTRICT # 1
.p..
o

$84,980
Cong.Oist.

$84,980 $84,980
4,6,11 ROC

$254,940
ARC



'.',

MACON



ACCESS TO JOBS FOR MACON Section 3037

DESCRIPTION

STIP#

,

<'

Access to Jobs/Reverse Commute Program

TOTAL "
Federal

"

<'

,

State

Local

DOT DISTRICT # 3

FY05 TOO0678

PY06'

FY07

TOO0943 TOO1252 ~"

TOTAL

$1,167,700

$0

$0 $1,167,700

$1,167,700 $583,850 $0 583,850
CONG.OIST.

(\$0' v' ">/-"$0

$0

$0

$0

$0

$0

$0

3,8 ROC

"$1;1 61,too
$583,850 $0
583,850 MO

,~ .....

CAPITAL SCHEDULE FOR MACONBIBB COUNTY TRANSIT AUTHORITY

Purchase 30 ft transit buses (3 Administrative Vehicles (2) Purchase Paratransit Van (1) Lease Payments on Vehicles (3 buses, 2 trolleys, 1 van
FEDERAL COST STATE COST LOCAL COST
DOT DISTRICT # 3

~ll~I\_i=~;I~

$585,000

$585,000

$585,000

$1,755,000

$25,000 I

I

$25,000

$50,000

$40,000 I

$40,000

$80,000

i,812 I

$155,812

$40,000 I

I

I

$40,000

::~::::!~Q:;~1g::f::.:::::::::~Z~g~~lg::.1:::::::;::::i~9~~~1@:::IH::.;:;:~gi~~g;I::::

$644,650 I $80,581 I $80,581 I

$624,650 I $78,081 I $78,081 I

$644,650 I $80,581 I $80,581 I

$1,913,949 $239,244 $239,244

CONGo DIST.

3,81RDC

MG

~
tv


ft ~

OPERATING ASSISTANCE SCHEDULE FOR MACON-BIBB COUNTY TRANSIT AUTHORITY SECTION 5307
:::::[QPpiQi::::::::::::::::
::::::::::::!:!:FM:9.~! ..!:::!.::!:.:!:!

(07/0104 - 06/30/05)

$2,670,152

$2,670,152

(07/01/05- 06/30/06)

$2,723,555

$2,723,555

FEDERAL COST LOCAL COST

$2,778,026

$2,778,026

.:0Ig;~lP~1.~I:.::!!:!::!;g~t~~;~~~!I::.::"!:.:I~~I~!;pg~:::I:::::::::"~,,~~~:~~~t~I:::

$1,335,076

$1,361,778

$1,389,013

$2,561,362

$1,335,076

$1,361,778

$1,389,013

$5,610,371

DOT DISTRICT# 3

CONG.DIST.

3,81 ROC

MG

.j:>.
w

CAPITAL SCHEDULE FOR MACONBIBB COUNTY TRANSIT AUTHORITY SECTION 5309

Qe$Q~,ettf~N.i.:.:!:.::"::::i::!:):::::i:)::i:)ii:!:ij,!!!ii!ii:i::::::.

::i:iiiiij~J1i:i::i::::ii:i i;ii;i;:::~g~1:~~1:::!::::!i:ii:::
:'!))::i)::~M=:~~:)i::)::::.::)!:! i:'::i::'))!':::!:'!i:'!F:M)!~;t);,:!:!:')"':i:':"':ir:':):i::iii::)i:itillti!i:i:::):):):):i::

Purchase three 30 ft transit buses

$285,000

$285,000

$285,000

$855,000

kgbJS6mdbsm::::::::::;:\:;;::::!::::;::;:::::::::i:i:i;::::.:::: :i::i:i:i:::H!!ii.::::i:::i.I:i:::i:i!i!$.~~~JI.~~iiHii.i.:i:ii:i:i$.i$.~~iUQ::.!j.::"!:~i:.i::iii!~I;~iu:i:)I!!!.!::::i!i:::: .i:ii$~~$l~~iii

FEDERAL COST STATE COST LOCAL COST

$228,000 $28,500 $28,500

$228,000 I $28,500 I $28,500 I

$228,000 I $28,500 I

$684,000 $85,500

$28,500 1$85,500

DOT DISTRICT # 3

CONGo DIST.

3,8IRDC

MG"

t



CAPITAL SCHEDULE FOR MACON-BIBB COUNTY TRANSIT AUTHORITY

Purchase one alternative fuel vehicle Multi-modal Terminal Station Renovation Terminal Station Roof Rehabilitation

T001282 T001280 T001281

$294,678 $4,325,791
$332,004

..:..::::::.::::::::.:t... .. gi~4.~'!i:i&iji':::.ii

-.:.: :'.'.'.'.':'.':':':':':':':':':':'::::. :::::::::::::::::::ill::::::::::::::::::::::.I.i:.:..ii:.:$.~~~'$~i;!7~ii::

FEDERAL COST

$3,961,978

STATE COST

$0

LOCAL COST

$990,495

DOTDISTRICT# 3

CONG.DIST.

$294,678 $4,325,791
$332,004

3,8IRDC

: :.:::.::::Ji$,~~p:I~~Jii
MG

~ VI

CAPITAL SCHEDULE IN MACON FOR ELDERLY AND DISABLED Section 5310
~; t ' l -

Purchase of Service

$71,502

$71,502

Purchase of Service Purchase of Service

$75,078

$78,831

$75,078 $78,831

FEDERAL COST STATE COST

$57,202 $14,300

$60,062 $15,016

$63,065 $15,766

$180,329 $45,082

DOT DISTRICT # 3

CONG.DIST.

3,81RDC

MG

+::-
0'\




OPERATING ASSISTANCE SCHEDULE FOR NONURBANIZED AREA TRANSIT (Jones County)

SECTION 5311

OPERATING 'EJUOlJ

FY 2005

FY 2006

FY 2()07

TOTA,~

FISCAL YEAR 2005

$114,396

$114,396

(111105-12131105)

FISCAL YEAR 2006

$114,532

$114,532

(111106-12131106)

FISCAL YEAR 2007

$121,728

$121,728

(111107-12131107)

PROJECT COST

$114,396

FEDERAL COST

$57,198

LOCAL COST

$57,198

Project Identification # hDOT DIST. Ii

T_n~ n~ 070 3

3&8

CAPITAL SCHEDULE FOR NONURBANIZED AREA TRANSIT (Jones County)
SECTION 5311

$40,000

$41,000

$0 $81,000

PROJECT COST.

'$79,(100

EDERALCOST

$63,200

STATE COST

$7,900

LOCAL COST Project Identification #

$7,900
T000965 II TOO 1198

~

'I DOT DIST.

I

CONGo DISTRICT #

3&8

-:J

'.

ROME



CAPITAL SCHEDULE FOR ROME TRANSIT DEPARTMENT Section 5307

Transit Coaches Bus shelter/bench renovations and additional purshases

$480,000 $20,000

:mQQ1~4~i::i:ii:,
$540,000 $250,000 1 $1,270,000

$20,000

$20,000

$60,000

One(1) Trolley bus w/lift two-way radio, fare box

$300,000 1 $300,000

One (1) Administrative support vehicle

$25,000

$25,000 1 $25,000 1 $75,000

Maintenance support truck

$25,000

$25,000 1 $25,000 1 $75,000

Fareboxes for buses

$50,000 1

1 $50,000

security and surveillance cameras

$50,0001

1 $50,000

Paving/repair parking lot Office Equipment/Furniture, etc. Maintenance Tools/Equipment

$20,000 I .$15,000 I

$75,000 1
$10,000 I $20,000 I

1
$10,000 I $20,000 I

$75,000 $40,000 $55,000

Maintenance Items (capital parts) FEDERAL COST

$50,369

$95,000

$80,000 $225,369

~i:::i::i$~~~~~liiii::iiiiii:i:$.~~9~~~9:il i:iiiiil:lililii$7~g19ppiil iii:i:I:~~~I!~~I~i:i:

I $508,295

$728,000

$584,000 $1,820,295

STATE COST

$63,537 1 $91,000 1 $73,000 1 $227,537

LOCAL COST

$63,537 1 $91,000 1 $73,000 1 $227,537

+>-
00
DOT DISTRICT # 6

CONG.DIST.

11 IRDC

CV

OPERATING ASSISTANCE SCHEDULE FOR ROME TRANSIT DEPARTMENT Section 5307

"",:'<:':::'}:}I::::::::!::':::::!:::::i:EI:::ge:::;',:::,T::,,:h:::!::.]::::9:::::L::::':~::::Ei~::!!pf:::::l!:!'::T:!:::h::!::H~:!:::~!::::_::::::1':'mJ!!1Qp,:1:::::~,:!,::!::::!.!t::::!:!:!:'!:':":!:'lliliBE::':::;':::::.:'::'!

(01/01/05 - 12/31/05)

$ 1,934,330

$ 1,934,330

(01/01/06 - 12/~1/06)

$ 2,031,015

$ 2,031,015

(01/01/07 - 12/31/07)

$ 2,15,7,970 I $ 2,157,970

1:::'B~~4.IRn::'Rqlu:::'::::::!:::::::':::::::::::::::::,::::::::::::::::::::::::::::::::::::!::::::::::,::::::::::::::$:::::::::":':::::1~1~!~~~9:::::!I:,::::::::::gi@~:1::~91:::,:::I:::::::::I~I:~iP~~jfQ::::::::::$.:::::::::::pjl:g~~$.:1:p:,:::1

FEDERAL COST

$ 631,766 $ 631,766 $ 62,1,766 $ 1,895,298

LOCAL COST

$ 1,302,564 $ 1,399,249 $ 1,52:6,204 $ 4,228,017

DOT DISTRICT # 6

CONG.OIST.

111 ROC

CV

+:-
\0



CAPITAL SCHEDULE FOR ROME TRANSIT DEPARTMENT

FEDERAL COST LOCAL COST STATE COST
DOT DISTRICT # 6

$1,000,000

$0

$0 I $1,000,000

$250,000

$250,000

:!:!ij;~$~;~~!~:!!: ~!;:!!!:!!~i~~j:ii:p,::i!:"::!::;!:!i~$.p~i9g::::.:!::~!1;~~:9~99:9:i,1

$1,000,000 $125,000 $125,000

$200,000 $25,000 $25,000

$200,000 $1,000,000
$25,000 I $125,000 $25,000 I $125,000

CONG.OIST.

11 I ROC

CV

oVI

CAPITAL SCHEDULE IN ROME FOR ELDERLY AND DISABLI~D Section 5310

eg1ir-N~i::eJ;g($pii:::

iiiiiiii;l;qQ~Ii!i!iiilii:ill~lill!!!"!!.

Purchase of Service Purchase of Service Purchase of Service

$42,901

$42,901

$45,047

$45,047

$47,2(39

$47,299

FEDERAL COST STATE COST

$34,321 $8,580

$36,038 $9,009

$37,8:391 $9,41301

$108,198 $27,049

DOT DISTRICT # 6

CONGo DIST.

111RDC

CV

-VI




SAVANNAH



TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 - 2007

CAPITAL SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY (50/50)

r',,, "'>FUNDING .: ,11:,:'' DESCRIPTION . .: .11
STIP#

UNIFCOST:qll. . FY2005 ".',:.ill :':FY2006>II>FY200ZII '<TOTAL>I

TOO0675

TOO0942

T001251

Section 3037

Job Access

N/A

$4,850,348

$1,500,000

$2,000,000

$8,350,348

!PROJECTCOST ........
IFEDERAL COST LOCAL COST lOOT DISTRICT #

II... ,::$4.85o,34811 """"''$1;500;0001/$2;000;00011<$8,350,3481

$2,425,174 II

I

$2,425,17411

5I1CONG. DIST.

1, 12

$750,000 II
$750,000 II
IIRDC

$1,000,000 II
$1,000,000 II
CG

$4,175,174 $4,175,174
I

VI
tv

TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 - 2007

CAPITAL SCHEDULE FOR CHATHAMAREA TRANSIT AUTHORITY (80110/101

I

I < ..FUNDING< 11<

I

ISTIP #

DESCRIPTION

<.<IIUNITCOST 11 . FY2005<1I . FY2006)<IIFY2007<U>TOTAL. . ,

I

I

T000668

I

T000928

I

T001247

I

I

ISection 5307

Communications

VARIES

$175,000

$225,000

$275,000

$675,000

Section 5307

Maintenance Tools/Equipment

VARIES

$175,000

$200.000

$225,000

$600.000

Section 5307

Transportation Development Plan (TDP)

VARIES

$150,000

$100.000

$100,000

$350.000

Section 5307

Preventive Maintenance

VARIES

$880.341

$800.000

$900,000

$2.580.341

Section 5307

IService Vehicles

I

VARIES

I

$170.000

$100.000

$50.000

$320.000

IfPSQ4E:OJCQOST
rEDERAl COST STATE COST LOCAL COST IDOT DISTRICT #

I ..... > ............... ><. . .> ICI>{$h!)!)O.:.H1LII.....>..) .$1.44!)~QQOII)$1i!)!)Q.oOo II< .....)$4'SZSia4tl

$1,240,273

$1,140,000

$1,240,000

$3,620,273

$155.033

$142,500

$155,000

$452.533

$155034

$142500

$155000 .

$452534

5I1CONG. DIST.

1, 12

IIRDC

CG

I

Vl W




TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 - 2007

CAPITAL SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY (80/10/10)

) ' "... FUNDING ".".."

.>bE$CRIPTION<> ' ) . . PNITCOST I. ...'"'.

STIP#

TOO0669

Section 5309 Bus and Bus-Related Facilities

NA

$5,495,170

Section 5309 Passenger Amenities

NA

$1,160,000

Section 5309 Intelligent Transportation System

NA

$1,250,000

Section 5309 Facility Modifications

NA

$1,914,745

Section 5309 Fareboxes

NA

$350,000

Section 5309 Centre Station

NA

$2,716,949

TOO0923 $1,000,000
$700,000 $500,000 $1,500,000 $200,000 $1,000,000

T001248 $1,000,000
$100,000 $500,000 $1,500,000 $200,000 $1,000,000

$7,495,170 $1,960,000 $2,250,000 $4,914,745
$750,000 $4,716,949

.~ 'f ~w

~
STATE COST LOCAL COST lOOT DISTRICT #

'$12;$$();$p@ .n))$4;~qQ;qqq.

$10,309,491

$3,920,000

$1,288,686

$490,000

$1,288,687

$490,000

51ICONG. DIST.

1, 12

IIRDC

$4i$QP;QQQi n.n$44MJ$()\$94

$3,440,000

$17,669,491

$430,000
I $430,000

$2,208,686
I $2,208,687

CG

I

FHWA

VI

~ I"" _ .._, I I _I I

I

0001771

!.)nitCQst I $1,000,000 I

4ff;F~deral&,.

( /)Ji; .~tater

$800,000 I

$100,000 I

$100,000 ,

$1,000,000 I

**MPC Does This One

TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 - 2007

CAPITAL SCHEDULE IN SAVANNAH FOR ELDERLY AND DISABLED (80/20)

I

FUNQINGH>II .'. ... DESCRIPTION.>ill

UNITGOST

II FY 2005 .. II\FY2006 .>II>PY2007<1I>TOTAL . 1

STIP#

TOO0670

TOO0929

TOOO1249

Section 5310

Miscellaneous Equipment

VARIES

$102,964

$102,964

Section 5310

Miscellaneous Equipment

VARIES

$108,111

$108,111

Section 5310

Miscellaneous Equipment

VARIES

$113,517

$113,517

IPRQ4E.OIQQ$Tt..n..}} ....... ......<......... i.>....>.11.. i./}$"1.02iQ64II<$"10l3/11"1ill??$"1"1.$iS"17UII.:$$g4;$$.2.tl

FEDERAL COST

$82,371

$86,489

$90,814

$259,674

STATE COST LOCAL COST
lOOT DISTRICT #

$20,593 $0
51ICONG. DIST. 1, 12

$21,622 $0
IIRDC

$22,703 $0
CG

$64,918 $0
I

VI VI




TRANSPORTATION IMPROVEMENT PROGRAM FY 2005 - 2007
OPERATING ASSISTANCE SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY

FISCAL YEAR 2005

Section 5307

TOO0667

$10,892,827

$10,892,827

July 1, 2004 - June 30, 2005

FISCAL YEAR 2006

Section 5307

TOO0927

$11,219,619

$11,219,619

July 1, 2005 - June 30, 2006

FISCAL YEAR 2007

Section 5307

T001246

$11,556,200

$11,556,200

July 1 2006- June 30 2007

5~r~_,

-_:- _.::. . .. . . ..~~.. __!:. IPROJECTCOST.... ......................................................11 ><$10,892,827.11.(. $11,219161911 >. $1.1;556;20011(..<$33,668,6461

IFEDERAL COST LOCAL COST

$1,824,22511

$1,878,952

I

$9,068,602 II

$9,340,667

$1,935,321 II
$9,620,879 1/

$5,638,498 $28,030,148

lOOT DISTRICT #

51 CONGo DIST.

1, 12

I

1, 11

I

VI 0\



WARNER ROBINS



RURAL PUBLIC TRANSIT
TITLE 49 U.S.C. SECTION 5311
TRANSPORTA TlON IMPROVEMENT PROGRAM FY 2005-2007

IPROJECT DESCRIPTION:

I

OPERATING ASSISTANCE SCHEDULE FOR RURAL PUBLIC TRANSIT (PEACH COUNTY)

OPERATING PERIOD
FISCAL YEAR 2005 (1/1/05-12/31/05) FISCAL YEAR 2006 (1/1/06-12/31/06) FISCAL YEAR 2007 (1/1/07-12/31/07)

oEJI

'389(J05 i
. . - ~.~--~

Rural

Transit

ICI::J~ 2005

2006

2007

.'dxt<;j ),,1,,,;,,p1~.<,,,4I1di~

$138,410

~'._~~fl.gp~.:._ Rural Transit
{ ..
..3.~~QQ7 .. Rural Transit
. ijw.la~ii.b.~::.:: ::::::t::::::;;:;.::::::::
FEDERAL COST FAREBOX LOCAL COST !DOTDISTRICT #

"y "$142i;905

1----

...~ .... _ -

I'"

. . 'f

I:; .~J~.,I~}

$142,905 $152,735

$138,410 $55,364 $27,682 $55,364 3

$142,905

$152,735

$434,050

$57,162

$61,094

$173,620

$28,581

$30,547

$86,810

$57,162

$61,094

$173,620

CONGo DISTRICT # 1 & 3

VI -.l

CAPITAL SCHEDULE IN WARNER ROBINS FOR ELDERLY AND DISABLED Section 5310
::;!!m~~n~~o:ii.:ir j:ji;iiiii:e.:I~:.:.j:j.::::

Purchase of Service

$28,601

$28,601

Purchase of Service

$30,031

$30,031

Purchase of Service

$31,533

$31,533

:1!f.)wlII!~~~~:::::i:::::::.::!:i.i.!.:iI:i:1i:.:.i:"::.i:I:i::.:!:.i:.:.:Iii:l:i.. :iii.ii.liliiiiii::I;ii~~~~~:i:::::i:.i:i:.::: -,:I~~:~~~.1H::i.::.:;:.:::::I:.I:I~Ii.i~~~I:ii:i::::::l:;:il~:~~~:~~

FEDERAL COST

$22,881

$24,025

$25,226

$72,132

STATE COST

$5,720

$6,006

$6,307

$18,033

DOT DISTRICT # 3

CONGo DIST.11,3

ROC

MG

VI 00




RURAL PUBLIC TRANSIT

TITLE 49 U.S.C. SECTION 5311

TRANSPORTATION IMPROVEMENT PROGRAM

FY2005-2007

\PROJECT DESCRIPTION:

I

I
CAPITAL SCHEDULE FOR RURAL PUBLIC TRANSIT AT 80110110 SPLIT (PEACH COUNTY)

FUNDfNG RURAL TRANSIT

(1) Conversion Van with Lift,

RURAL TRANSIT I 3C90061 WRATS1-1812l I NONE I

RURAL TRANSIT I~~~()QZJ WRATS1-18(3) I NONE I

FEDERAL COST STATE COST LOCAL COST IDOT DfSTRfCT#:

TAL

$0

$0 $40,000

1/

I

$0

.$0:

$0

$0

-

I

I

$0

"7'~'

'?

$0

$32,000 $4,000
" $4,000 3ItONG. DfST.:

$0

$0

$0

$0

1 & 3 RDC:

--
$40,000
$32,000 $4,000 $4,000
MG

VI \0



RURAL TRANSIT PROGRAMS



CAPITAL SCHEDULE FOR STATEWIDE NONURBANIZED AREA TRANSIT Section 5311

P.l$tt{ljWfIPi$.mgJ$J$i@Meititifi))il$ne:~ri))p)i:it:Y:~U.Q$.if)[lfiiffiiii~.~J)Qi:)))qi))iiifit:Yi:~U.Qtif:)ii::iliifiii))TP.T.Aijft:?

1

Gainesville

2

Tennille

3

Thomaston

4

Tifton

5

Jesup

6

Cartersville

7

Atlanta

All

Supplemental

--

Ali Iintercitv Bus

T000701 $ 271,000

T000961 T001194 T000672 $

$
I
486,500

552,000 1$

I 282,000

$1,105,000

T000963 T001196 T000703 $

$
I
559,500

955,500 1$

I 661,500

$2,103,500

T000965 T001198

$
I

443,000 1$

I 176,000

$1,178,500

T000705 $ 1,003,000

T000967 T001200 T000707 $

$
I 394,000

3,350,000 1$

I 2,710,000

$7,063,000

T000969 T001202 T000709 $

$
I 759,700

172,400 1$

I 234,000

$800,400

T000971
T001204
N/A N/A N/A

$
~

1,324,600 1$
$0
I

I 751,700

$2,836,000

$0 I

$0

T000711 $ 300,000

T000973 T001206 T000713 $

$
I
1,567,729

300,000 1$

I 300,000

$900,000

T000975

$ 1,567,729

T001207 I

I

I $ 1,567,729 I $4,703,187

-~---

)i:ii::$$;$41i4~$.ii$::)1h~[$ii~~~)i:i$:n)p';~~j$~~tiri)i$1$.~$.~$. ;\mQ i

:HH\fffii$.4:Z:r~i14~ :f::::HH$.9.$.a2tJ~: HHHHH$.S::..4.~r~4~:HHH$1~1:aSI1:zQ
:::::fi$.~~4;it4~i::Hi:H/%$.$/.;.~;$z~ ::/:fi:::i:i::i)$.$.$.~;Z$~::::i::f$1i$Q~:h$.4~ i:)i:$;$~4a4~:t:::::ttt)$.$.$:~:i$~$.)::):t:)):$~:~:i~~:i: :t: :ii::::::$M~~~:i~4'l).

o01

OPERATING SCHEDULE FOR STATEWIDE NONURBANIZED AREA TRANSIT Section 5311
p!$TRip.1W;.O!$TRfOJHJAMg::)')::))::)))::.\$Tifti:) : ')'::)fM)ZQQ~)))::)):) ::::::)):EX:z.mi~E :.: )))):::::::::]i,1Yi.QijZ:: .,: :::::WQ:fAW: (:

1

Gainesville

TOO0702

$1,114,386

TOO0962

$1,217,220

T001195

$1,290,540

$3,622,146

2

Tennille

TOO0673

$1,858,137

TOO0964

$1,948,030

T001197

$2,116,086

$5,922,253

3

Thomaston

TOO0704

$1,816,117

TOO0966

$1,861,912

T001199

$1,386,109

$5,064,138

4

Tifton

TOO0706

$3,121,635

TOO0968

$3,288,474

T001201

$3,501,378

$9,911,487

5

Jesup

TOO0708

$1,094,822

TOO0970

$1,076,652

T001203

$1,153,509

$3,324,983

6

Cartersville

TOO0710

$3,249,445

TOO0972

$3,405,986

T001205

$3,542,737 $10,198,168

7

Atlanta

N/A

$0

N/A

$0

N/A

$0

$0

ALL SUPPLEMENTAL

TOO0712

$600,000

TOO0974

$600,000

T001208

$600,000

$1,800,000

!t9IAM:PQ$.:r.$:.:)://ii//? ':.":'::,"::': :: ''$.1\Z;~$41$4.~ :i/"U~;~~~h~rt.#' /::$.1;};~~~;~$~ ::)://$~~;Mli~art.~:

FEDERAL COST (50%)

$6,427,271

$6,699,137

$6,795,180 $19,921,588

LOCAL FUNDS (50%)

$6,427,271

$6,699,137

$6,795,180 $19,921,588

-0\





CAPITAL SCHEDULE FOR ELDERLY AND DISABLED (Statewide) SECTION 5310
[~!.$lqf({{'::f{ f $:If.iNft :':,:{:d:{:) 'f,y:t.ii:il~ f/::/!{(:{f,yiii:M:::fff, :t':::'f::::,:::t,y:;iii:ilit:ttltt::::::ji:itAC ::rr';;;

1 (15 Counties)
2 (13 Counties)
4 (10 Counties)
5 (11 Counites)
6 (15 Counties)
7 (11 Counties)
8 /16 Counites)
9 (15 Counites)
10 /14 Counties)
11 /18 Counties)
12 (9 Counties)

TOO0681 TOO0976 T001209 TOO0682 TOO0977 T001210 TOO0683 TOO0978 T001211 TOO0684 TOO0979 T001212 TOO0685 TOO0981 T001213 TOO0686 TOO0982 T001214 TOO0687 TOO0983 T001215 TOO0688 TOO0984 T001216 TOO0689 TOO0985 T001217 TOO0690 TOO0986 T001218 TOO0691 TOO0987 T001219

$205,927 $148,725 $151,585 $105,823
$71,501
$62,921 $102,964 $105,824 $111,544
$37,181 $480,497

$216,223 $156,161 $159,164 $111,115
$75,078 $66,068 $108,112 $111,115 $117,120 $39,040 $504,521

$227,035 $163,969 $167,123 $116,671
$78,831 $69,372 $113,517
$116, 67 1.l
$122,976 $40,992
$529,7471

$649,185 $468,855 $477,8721 $333,609 $225,410 $198,361 $324,593 $333,610 $351,640 $117,213 $1,514,7651

iiAt,q$t$:{{

,::::t$i;$1;i4)i~I::):$j;~~MMit:::::::):::::::f:nit4~;~Mlrt::::::f4;~~;:H$

FEDERAL COST (80%) STATE COST (20%)

$

1,267,5941 $

1,330,9741 $

1,397,5231 $

3,996,090

$

316,898 1$

332,743 I $

349,381 1 $

999,023

0\

ILOCAL FUNDS (0%)

01

01

01

0

N



APPENDIXC
MAPS
Georgia Rail Passenger Program and HSR Commuter Rail Lines Intercity Rail Lines Existing Passenger Rail System Urban Transit Systems Rural Transit System Bicycle / Pedestrian Governor's Road Improvement Program (GRIP) Metropolitan Areas

(((

( .i .r -.l ..i .: .s .c--.! .s .: --.! .: .: .: ...L _L-l ( ( Georgia Rail Passenger Program

Georgia Rail Passenger Program & HSR

Gulf Coast High-Speed Rail Corridor

j3JeenV~ ille
\

1
So uth-East High- Speed Rail Corridor

Augusta

cdS b Commuter lines

m, Intercity lines

Phase 1

Intercity Tier 1

_

.:. Dacula & Griffin

Albany, Savannah, Jacksonville

.:. Athens & Macon Other Intercity

Other Commuter

Augusta, Columbus, Greenville

Bremen, Madison, Canton

Senoia, Gainesville

1

~~ i ' W"Ir.ij

, (

(

(

<

(( ( (((( (((( ( ((

Georgia Rail Passenger Program

Commuter Rail Lines

Ca ~1'efl---j Gainesville

o .;-vccoa

Augusta

2

=.r::',

rn .

Georgia Rail Passenger Program
Intercity Rail Lines

~

sernen
o

<~
'J

G ree n vil l e

J\

o

I

../

l Ca~to" Oame.ivd!

I o

0'

O'I O:\:CO<l

"jy eul. (Jnens

!;t[a nta

Olson (

.I. I.

oI Senoia

_6 .I'j m'

J

\. JJ
(
tl
a r.on
L

'-

) '-COll {mou s
)

Ea.t m

"

Augusta 0 " \.

)

\

)

t

l

( o lit~lii'l .>S'il va n~~ h

r

0,)

( Amerlcus
r)

\
~

-_I

~
t"
l \ :::l

i
~

3es u ~7~

o<r
i) 'v

1J

. J~kSOnV'lIe
o

3

. .. GRC ~ ~ ~ , ~"

Existing Passenger Rail Service (AMTRAK)

E
sC:Il ..... cOJ
E...
rn
'- ~

To Greenville

Passenger Service
Passenger Station
--11II(0)---

To Columbia &
Charleston

Georgia Department of Transportation Office Of Intermoda l Programs July 1,2004

Jacksonville

URBAN TRANSIT SYSTEMS

M ROPOdTA AT
T sn A TH
(MARTA)

~ AREA

T

nT Sll (HAT )

en COv T'r r
DOJ LA ' COJ

(AT 5 ) A GJ TA PUB ~I C
5 11 TAA SI1 (APT )
I -S hAR l
SI1

MACOl'.-l:)lt~ CO r ...-. 1 ".. ' 11 A rH ITY {M TA}

CO,-

II 'iST -

TAA)

AREA T ' SIT AJTH R T't (C AT)

_bAN TfV'\l",.,11 SYST -

-,

Rural Public Transportation Programs

SECTION 5311

CD Cedartown
@ Canton
Unadilla
@ Vienna
Americus Social Circle
(j) Arlington
Dawson Sylvester



Statewide Bicycle Route Network & Locally Adopted Bicycle/Pedestrian Plans
___ Planned Statewide Route
o MPOplans
D Both MPO and other plan(s)
II] Plans in development
D Plans under consideration
GOOT Oltlce '" P1an" '"Q tv.lI03

4PO
{

Governor's Road Improvement Program
(GRIP) CURRENT STATUS
JANUARY 05

Ope n Unde r Construction Right of Way Preliminary Engineering No Activities

Georg ia MPOs Chattanooga and Urban Areas Boundaries
Dalton
Rome

o MPO Boundl:a~ri:e~s--...L-_-J__-l--~....._L-=:=:::::_~-J
1990 Urbanized Areas 2000 Urban Clusters _ 2000 Urbanized Areas
c=J GA Counties 'Oalton MPO Boundary r not yel detefTTuned"'j

+N
GeorgaI DOT O1Tice of PlamlllQ, Sl1B1Oo4