State Transportation Improvement Program 2001-2003

/>: <,

)

';

v

;

(

.-. \

Georgi Depanment .
of Transponation

o 2001-
2002'
.. 2003

State Transportation

......
l'
....It.. .c.\
:.,.:.... -'':
.,~-:::;.;~~;,-

Improvement Program

State Transportation Improvement Program


Introduction



STIP Public Involvement Process

STIP Funds by Category

STIP Financial Plan - Lump Sum Funding



Understanding STIP Entries

Map of Georgia



Highway, Bridge, and Transit Projects



Index

Appendix
.,~

Glossary

Transit Programs Tables

Proposed Passenger Rail System

Intercity Rail Passenger Routes

Bike/Ped Map



GRIP Map

Rural Transit Map



Urban Transit Systems

Metropolitan Areas

"
..(\
~--

...



State Transportation Improvement Program

Introduction

We are pleased to present the State Transportation Improvement Program (STIP). Projects listed in this document were identified through the planning process and are important to the state's transportation program.

The STIP includes Highway and Bridge, Bicycle, Pedestrian, Transportation Enhancement Activities and Public Transportation (transit) projects. Project related cost, such as Preliminary Engineering (PE), Right of Way (ROW), and Construction are given for highways and Capital and Operating cost for public transit. The projects are organized in alphabetical order by county with the same information categories listed for each of them.

Cost estimates for individual projects are based on the best available engineering estimates.

These costs may change as a project progresses from preliminary engineering to the purchase of

right of way to construction. If these increased costs are the result of a change in the original

scope of the project, the STIP will be amended, after public comments are considered. If the

'.

increased costs are based on updated engineering improvements, and not a change in the actual work, no amendment to the STIP is necessary.

The STIP was developed under guidelines provided by the Transportation Equity Act for the 21st Century (TEA-21), passed by Congress in 1998. TEA-21 continues the initiatives started under the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). Projects in the STIP emphasize the maintenance, safety, and improvement of existing transportation facilities, and public transportation systems.

The STIP is fiscally balanced, including only those projects with funding available or having a reasonable expectation of obtaining funds. Federal funds for fiscal years 2001,2002, and 2003 .are program estimates and will not be final until after the federal budget is implemented on October 1 of each year.

Georgia continues to grow in population at more than double the national average. Georgia's economy is also growing, leading to increased demands on the transportation system. The STIP process insures that we receive maximum benefits from available .funding and that Georgia's transportation system will continue to support and promote Georgia's growth and economy.

The Department of Transportation wishes to thank all of the citizens and local officials for taking the time to provide input on the development of this program.

"'



Georgia Department of Transportation

STATE TRANSPORTATION IMPROVEMENT PROGRAM

PUBLIC INVOLVEMENT PROCESS


Background on the State Transportation Improvement Program

Federal legislation requires that each state produce a State Transportation hnprovement Program (STlP). The STIP lists federally funded projects for the next three years, updated and approved on an annual basis.

A major component of the STIP development process is public- involvement. In the eleven metropolitan areas of the state public involvement is the responsibility of the local metropolitan planning organizations (MPOs) in developing local Transportation hnprovement Programs (TIP). The Office of Planning oversees the STIP public involvement process for the six rural GDOT Districts and distributes the STIP to the Districts for use in their public meetings and meetings with local officials.

Process

The public involvement process has evolved over time but the basic components remain the

same.

'



Public meetings

'.

,
Annual public meetings are held to provide the opportunity for public review and

comment. GDOT contracts with 15 Regional Development Centers (RDC) to

assist with coordinating the STIP public involvement process. In 1997, a

statewide video teleconference was held in seven sites throughout the state. For I
the past three years, DOT District personnel with RDC participation have

conducted the meetings. In 2000 nine public meetings were held on the following

dates:

May 31 June 1 June 6June 7June 7June 8June 15 June 15 June 22 -

Jesup Gainesville Commerce Calhoun Reynolds Thomaston Tifton Hiwassee Tennille

The Department and the RDCs invite large numbers of customers to these meetings. The Department mailed 3,700 individual invitations to local officials and the Family of Partners, a group of stakeholders with interest in transportation.

The RDCs invite local officials, chambers of commerce, transportation providers,

and others. In all, over 5,000 invitations are distributed. Total attendance



statewide at the nine meetings was 380 people.

Ads are placed in local newspapers publicly announcing STIP meetings and



announcements are published in Department newsletters, (OnTarget) and RDC

publications. An informational brochure explaining the STIP process is also

published and distributed at the public meetings.



Meetings with Local Officials

Every year as part of the STIP development process, the District Planning and Programming Engineers meet with representatives from each county and city in their area to discuss projects in the STIP to solicit comments and questions. During these meetings, a range of transportation issues are discussed and requests
a are forwarded to the appropriate DOT office for response. Local officials sign
"Certification of Cooperation with Elected Officials" documenting STIP consultation.



STIP on web

The Department also makes the STIP available to citizens on the Department's . web page. The web address for the Georgia STIP is:

http://www.dot.state.ga.us/homeoffs/planning.www/stip/district.htm

An email contact is also included on this site for citizen's comments.



Comments

Comments received from the public meetings and the meetings with locals are taken into consideration in the development of the STIP and any questions asked are answered or forwarded to the appropriate office. To date, 84 written comments have been received, from the public meetings and the meetings with the local officials. The comments and questions ranged from general questions such as the need for more public transit routes to project specific questions, such as when is a particular project scheduled for construction. All questions were responded to in writing.

The State Transportation Improvement Program is also available in paper format for a fee by calling the Department's Map Sales at (404) 656-5336.

.......

.'

STIP FUNDS BY CATEGORY

Fiscal Year 2001 - 2003

$5.1 Billion

ReconstlRehab - - .
$2,178

Other ----.,.
$157

Safety-$305

Public Transit
$1,042

Maintenance
$236

Bridge
$521

Dollars shown in Millions

"'--- Enhancement
$182
New Construction
$469

Georgia Department of Transportation STIP Financial Plan

The Georgia State Transportation Improvement Program (STIP) lists highway, passenger rail and transit projects. This section describes how: the funding for the STIP was identified for Fiscal 2001-2003. The STu> Financial Plan demonstrates the' source and expenditures of transportation funds to state and local projects. The financial plan includes expenditures for projects matching resources that we can reasonably expect will be available. Only those projects or project phase (preliminary engineering, rights-of way or construction) for highway projects or (capital or operating) for transit projects are included in the STIP.

The 'Fiscal 2001-2003 STIP was developed on the basis of estimated state and federal fund balances and projected 2001, 2002, and 2003 Federal-aid and state funding. TheSTIP document includes a listing of urban and rural transportation projects. The STIP listing incorporates urban projects from the Transportation Improvement Programs adopted by Georgia's urbanized areas and approved by the Governor or his designee. This document is developed for the purpose of providing citizens a comprehensive listing of transportation activities.

The Fiscal 2001-2003 STIP totals $5.09 billion with a FY 2001 annual program of $2.25 billion. Funding for this three-year program includes $3.40 billion in federal funds, $1.48 billion in state funds, and $0.21 billion in local funds. This level of infrastructure investment supports nearly 200,900 jobs in the construction industry as well as a well-maintained transportation system that fosters a healthy economy by providing the infrastructure for efficient movement of goods and people.

The project cost estimates used in developing the STIP are based on the:best available engineering estimates at the time. Final cost for the actual projects may differ, as the'projects are refined in the project development process prior to construction. Modifications that alter the original intent, design, or scope of the project trigger a STIP amendment to incorporate the change.

U&~~f'~*:'.?'~~{~,~.;~f:::~fA ~.'(:~r~~;r~~\~e.~~;?::~~Yj,tx'.1F.f-V:Or:th~:,:?iJ

. ;:;:::-':'.:~.:'''_.~ .".

. . ,...,,: t.:,

,~'. :'. .-.

..::::~:::,':;::, "~::'! .. ',..... : ,,:

Interstate Maintenance (1M) - Funds used for resurfacing, restoration,' and rehabilitation of the Interstate Highway System. These funds cannot be used to provide new capacity to the system, nor for construction of new facilities such as rest areas, ports of entry, etc. '

National Highway System (NHS) - The system of national highways approved by Congress and considered most important to interstate travel, national defense, connectivity with other modes of transportation, and for international commerce. The system includes the current Interstate highways and other key state routes identified by the State.

.

Surface Transportation Program (STP) - STP funds may be used for a range of projects from new construction to resurfacing, and may be flexed to transit. STP funds are distributed according to

f...: - ....

~ .. federal guidelines and in compliance with State legislation.

Lf

Fifty percent of STP funds are for urban and rural areas of the state based on population. Thirty percent can be used in any area of the state at the direction of the State Transportation Board. Of the remaining twenty percent, ten percent is for highway safety projects and ten percent is used for' Transportation Enhancement Activity projects. Safety projects include Hazard Elimination, Railroad Crossing, and Railroad Protective Devices.
The Transportation Enhancement Program is very popular, especially with 'users of non-traditional transportation. The State Transportation Board established the Transportation Enhancements Advisory Panel to assist in project selection and to represent statewide interests with expertise in . multi-modal facilities, historic resources, transportation aesthetics, scenic preservation and other' TEA-type activities.
There are twelve categories of TEA projects. These include It provisions offacilities for pedestrians and bicycles; provision of safety and educational activities for pedestrians and bicyclists; acquisition ofscenic easements...or historic sites; scenic or historic highway programs (including the provision of tourist and welcome center facilities), landscaping and other scenic beautification; historic preservation, rehabilitation and operation ofhistoric transportation buildings, structures, or facilities (including railroad facilities); preservation ofabandoned railway corridors (including the conversion and use thereoffor pedestrian or bicycle trails); control and removal ofoutdoor advertising; archaeological planning and research; and environmental mitigation to address water pollution due to highway runoff, or reduce vehicle-caused wildlife mortality (while maintaining habitat connectivity); and, establishment of transportation museums. It Source: National Transportation Enhancement Clearinghouse.
Legislation limits eligible recipients to public agencies. However, private groups are encouraged to participate by applying through an appropriate public agency (County and/or City). TEA program funds require a 20% match provided by the recipient.
Congestion Management/Air Quality (CMAQ) - These funds are for projects, which can be proven to reduce traffic congestion and/or improve air quality in non-attainment areas. Projects such as park and ride lots, signal coordination, and ride sharing qualify for these funds. Currently, there are thirteen counties in the non-attainment area: Cherokee, Clayton, Cobb, Coweta, DeKalh, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Paulding, and Rockdale.
Bridge Replacement (DR) - These funds are for the replacement orrehabilitation of substandard bridges both on and off the federal system. Bridges must have a span of 20 feet and must be listed on the Federal Register with a sufficiency. rating of 80 or less for rehabilitation and 50 or less for replacement.
Demonstration or High Priority (Demo, HPP) - These funds are Congressionally authorized and designated for specified projects.

State Funding Sources - State funds are available from several sources including motor fuel taxes,

special fuel taxes (diesel) and 3% state sales tax on gasoline. Eighty-five percent of these funds are

-;;. used for construction and maintenance of highways. The remaining fifteen percent are programmed

I:.
~.~,,::.

(or improvements to local roads. Revenues from these sources increase about one percent a year. State funds are part of the STIP program development and are used for federal match.

2

Federal Highway Funding Sources - Federal funds in the STIP are estimated based on the

expectations of what Congress will authorize to be spent on the program. The Department expects a

total of $3.61. billion in federal funds over the next three years, from the Highway Trust Fund and

from carryover funding from the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 and from Transportation Equity Act for the 21st Century (TEA-21). Georgia's yearly share from the

Highway Trust Fund is anticipated to be about 3.48% of the estimated $29.2 billion Congress is

expected to approve. The obligation ceiling, or the minimum amount of funds that Georgia will

receive, is 92% of that amount. Estimates are subject to change based on forthcoming yearly

appropriation and obligation levels set by Congress.

I

Local Highway Funding Sources - During the three-year program local funds will be needed to match federal-aid for local highway projects and for local contributions to matching improvements on the state highway system.

The federal-aid program for FY 2001-2003 includes funds for improvements to the state highway system, for the local roads, transit and other projects. The following table summarizes program funding for FY 2001-2003:

FY 2001-2003 Estimated Cost of Highway Projects ($ Millions)
.... '

Fund Source

FY 2001

Federal Aid State Funds Local Funds Total
Program Distribution State Highway Local Roads and Streets Transfer to Transit Transit Related Highway Funded Other Total

$1,165 $646 $50
$1,861
$1,346 $242 $41 $137 $95
$1,861

Total

,

FY 2001-2003 ,

$2,695 $1,276
$77 $4,0,48

i

$2,924 $501 $84 $361 $178
$4,048 1

Average Annual FY 2001-2003
$898 $425
$26 $1,349
$975 $167
$28 $120 $59 $1,349

;-;'
LJ'

I Note that the amount offunds Programmedfor projects is $4,048 million. Amount offunds from all sources is $5.09,billion. The transportation

program isjinancially constrained.

'

3

Local Road Assistance

Federal-aid to local governments is primarily from the Surface Transportation Program and the Bridge Replacement and Rehab" ilitation Prog. ra,m' : . Loca] . .' '\, ,g' overnplen't. s r" ec" eive' ,fed".e' ,.ral fu' nIds for

specific projects arid Congestion Mitigation!Air: Quality funds based on project eligibility and

selection, Enhancement projects are selected, statewide based on the guidance provided through the

Georgia Transportation Enhancement Program. '

,

\
(, ".
:';,. .
~.y
4

Federal Aid Highway Estimated Obligation Authority FY 2001
($ Millions)

Category

Federal Funds

Interstate Maintenance Bridge Placement & Rehabilitation
National Highway System Congestion Mitigation Surface Transportation Program Misc. Categories Total Apportionment

$330 $216
$255 $49
$506 $216 $1,572

Required Matching Funds Total

I

:

$33 $365

I

$43 $259

$47 $302

$9 $58

$94 $600

$40 $256

$266 $1,840

Obligation Ceiling Minimum Guarantee Appalachian High Priority Projects Misc. Projects
Total Federal Funding Availability

$710 $215
$43 $179
$10
$1,157

I

i

$130 $840

$40 $255

,

$8 $51

$36 $215

$2 $12

$216 $1,373

Federal Aid Highway Estimated Total Apportionment FY 20012003
($ Millions)

Category (FY) Federal Aid Match Local Total

2001 $2018 $297 $58 $2,373

2002 $1,210
$189 $35
$1,434

2003

Total

,
$1,220

$4,448

$191

$677

$35

$128

$1,446

$5,253

Transportation Equity Act for the 21st Century - Title 3 programs

Transit, passenger rail, aviation, freight rail and ports join highways as significant modes in

Georgia's intermodal transportation system. Non-highway modes funded through Title ill or

through moneys flexed from Title 1 are part of the STIP. Because of its importance to the state's

transportation program, a comprehensive summary of non-highway modal programs, funded with

other than TEA 21 funding and administered by the Georgia Department of Transportation is

included in this document.

'

tJ.. ~:.-. ~

5

The Georgia Department of Transportation in cooperation with the Federal Transit Administration (FTA) and the state's public transit agencies work together to develop service programs and facility improvements to meet the state's public transportation needs.

One of the missions .of GDOT's public transit program is to preserve and enhance the state's facilities and equipment in urban and rural public transit. Public transit projects listed in the STIP are funded with Federal Transit Administration funds (under TEA 21). These projects have been identified by the MPOs through the transportation planning process and become a part of the Transportation Improvement programs (TIP) in urban areas.' The Department in cooperation with rural transit operators identifies rural needs. Urban transit projects are listed for cities with transit programs in operation - Albany, Athens, Atlanta, Augusta, Columbus, Macon, Rome and Savannah.

Urban transit projects include capital, planning, and operating (Federal Transit - Section 5307) and statewide elderly/disabled capital (Federal Transit - Section 5310) projects. GDOT is the designated recipient of FTA funds for areas under 200,000 population. The Department receives financing from' the General Fund budget to match one half of the local share of transit projects in Albany, Athens, Macon, Rome and Savannah. In addition, the Department coordinates with the Georgia Department of Human Resources (GDHR) on elderly and handicapped transportation projects.

Atlanta, Augusta and Columbus have populations of over 200,000 and receive transit funds directly. The Department also provides one half the local share of matching funds for capital projects in these areas. In the past few years, the Department has played an important role in providing financial assistance to match projects for Cobb Community Transit (CCT), the new Gwinnett County Transit, and the Metropolitan Atlanta Regional Transit Authority (MARTA).

Transit Programs include:

"

FTA Section 5307 Program - provides funding for capital, planning and operation

assistance. Funds are distributed nationwide on a formula basis.

FTA Section 5309 Program - offers capital funding for public transportation systems on a

discretionary basis.

'

FTA Section 5310 Program - provides funding to private non-profit agencies for capital improvements to be used in the provision of transportation service to elderly and disabled persons.

FTA Section 5311 Program - provides funding to enhance the access of people in nonurbanized areas to healthcare, shopping, education, employment, public services and recreation. Funds are available for capital equipment, operating and administrative expenses.

IJ
State Funding Sources - The State Legislature provides one-half of the required twenty percent

match for federal transit funding through the General Fund. Approximately $12 million in General
. (~','' ',. Funds for transit purposes are programmed in the STIP.

..

6

Federal Transit Funding Sources - The federal-aid funds estimates are partially based on estimates of federal revenue available to Georgia through the Transit Trust Fund and from earmarked funds in the Transportation Efficiency Act for the 21st Century (TEA-21).

Local Transit Funding Sources - During the three-year program, an estimated $130 million in ,local funds will be needed to match federal-aid. These funds are acquired through local sales taxes, special taxing districts, property taxes as well as the general tax digest.

FY 20012003 Source of Funds: Transit Projects ($ Thousands)

Fund Source Federal Funds State Funds Local Funds Total

FY 2001

$155,592 $4,891 $45,822
$206,305

Total FY 20012003 . $427;Q64 $12,145 $130,523 $569,732

Annual Averaae $142,355 $4,048 $43,508 $189,911

Estimated Costs: Transit Projects FY 2001 ($ Thousands)

Category .
Section 5311 0 Section 5307 0 Section 5310 Section 5311 C Section 5309 Cl Section 5309 C4 Section 5307 C 1 Section 5307 C4 G93 Total Apportionment

Federal Funds
$2,270 $4,372 $1,662 $4,192 $30,936 $57,660 $18,711 $35,639
$150 $155,592

Required State Matching Funds
$0 $0 $417 $526 $1,717 $0 $2,231 $0 $0 $4,891

Required Local
Matching

Total

Funds

$2,270 $4,540

$12,657 .$17,029

$2 ' $2,081

$526 $5,244

$4,517 $37,170

$14,415 '$72,075

$2,375 '$23,317

$8,910 $44,549

$150 $300

$45,822 $206,305

Estimated Federal Appropriations for Transit FY 2001. 2003 ($ Thousands)

Category (FY) Federal Funds State Funds Local Funds Total
r>. <-
~j

2001 $155,592 $4,891 $45,822 $206,305

2002 $136,899 $3,887 $42,707 $183,493

2003 $134,573 $3,367 $41,994 $179,934

Total $427,064 $12,145 $130,523 $569,732

7

The mission ofGDOT's aviation program is to'preserve and enhance the State's air transportation system to meet the demands of users. The program provides financial and technical support to publicly owned, open to the public airports. The GeorgiaDepartment of Transportation is authorized to plan and support the establishment, development and maintenance of aviation and aviation facilities. The Georgia Airport Aid Program (GAAP) provides state funding assistance, appropriated by the Georgia General Assembly, for capital, maintenance, approach aid and planning , projects. Development, Maintenance, Approach Aid, and Planning projects are funded at 75% state assistance or 50% state assistance for urban area airports lacking federal support. All FAA (Federal Aviation Administration) supported construction projects may be funded at 90% FAA and 5.5% state aid. Airport markings on State development projects are eligible for 100% funding. In addition, the minimum contract level of state funding assistance on all GAAP projects is $1,500. State projects (non-federal) are selected annually based on the GAAp Priority System criteria. Federally funded projects have the highest priority for matching state funds.

The mission of GDOT's rail program is to preserve and enhance the State's rail transportation. system for future development of freight and passenger rail service. Existing rail corridors identified in the "Freight Rail Plan" are acquired and rehabilitated to assure strategic rail freight access to Georgia communities. GDOT has acquired 281 miles of rail lines in Georgia since 1992. Three hundred and one miles of rail lines in the State have been rehabilitated since 1981. The passenger rail program, defined in the "Intermodal Program for Rail Passenger Service in Georgia," guides implementation of both intra-state, intercity and commuter rail service to provide a multi-modal alternative in the State's largest travel markets. The seven commuter services and the six intercity lines will serve the Atlanta, Athens, Gainesville, Bremen, Canton, Senoia, Griffin, Macon, Albany, Savannah, Augusta and Columbus markets.

The mission of GDOT's ports program is to preserve and enhance waterway transportation. In order to maintain a navigable channel, the Corps of Engineers dredges the Savannah River annually. The Department's role is to provide and maintain dredge material containment areas for the Corp's work on the Savannah Harbor and the Atlantic Intracoastal Waterway. The Department is required to fund dike design, construction, maintenance, environment mitigation and operations. GDOT annually requests funding from the Georgia General Assembly to cover the costs of these activities. There are no matching federal or local funds for these programs.

State Transportation Improvement Program (STIP) and

Transportation Improvement Program (TIP) Amendment Process

If

The STIPfTIP amendment process described below details procedures that are to be used to update an existing approved STIP or TIP. A key element of the amendment process is to assure that funding balances are maintained.

8

TIP (Transportation Improvement Program) Administrative Changes The following actions are eligible as Administrative Changes to the TIP: Obvious minor data entry errors. Splitting or combining projects. Minor change in expenditures for transit projects Changes or clarifying elements of a project description (with no change in funding). This would
generally be less than 10% change in project termini. This change would not alter the original project intent. Increase funding less than 20% for a Lump sum category

The Administrative Change process consists of a letter of notification from the MPO (Metropolitan

Planning Organization) to all other involved parties: GOOT, FfA and FHWA. No public

involvement process is required for Administrative Changes.

'

TIP (Transportation Improvement Program) Minor Amendments (not controversial)*

A Minor Amendment to the TIP would include adding or deleting one of the following project types:

Bike/pedestrian projects

TEA projects

Transit enhancements

Transportation studies using capital funds (also needs to be in S~R Work Program)

Turn lane, intersection improvements and signal projects

.,

Signage, lighting, landscaping or green way projects

Recreational Trails projects

~

Minor ITS/ATMS projects

*A controversial project is defined on a case by case basis through the MPO planning process. Consideration will be given to the amount of money involved, scope, geographic location and impacts in evaluating if a project maybe controversial.

A Minor Amendment to the TIP would include making any of the following changes: Shifting projects within the TIP Move PE, ROW or Construction Funds programmed for previous year into a new TIP Shifting Construction funds to add a PE or ROW phase to a project The deletion of a project at the request of the Project Sponsor . Increase funding more than 20% for a Lump sum category (maintenance, safety, PE, hazard elimination, RIR crossing etc.)

The Minor Amendment process for areas with over 500,000 population requires advertising of the amendment in a legal organ, allowing a IS-day comment period and responding to any comments received. Following public notice, approval action may be taken through the usual TCC, TAQC and ARC Board process.
'\
For areas with less than 500,000 in population, the amendment is placed on the agenda for discussion at the CAC, TCC and PC meetings and any comments receive responses.

The MPO is responsible for giving notification to GDOT and FHWA/FfA of the action taken and providing assurance that the minor amendment process and the public involvement process were

9

followed.

TIP (Transportation Improvement Program) Major Amendments

Major Amendments to the TIP would include the following.

Change in scope that alters the original intent of the project

Increase or decrease in the scope of a project by more than 10%.

Add/Delete project not identified in the minor amendment section: i.e. capacity increases,

regionally significant projects, major ATMS projects, and controversial projects of any

type.

'

The Major Amendment process for areas with greater than 500,000 in population requires

widespread advertisement, a 30 day public comment period, and response to all comments received,

either via individual or summary form. There is no requirement for a public hearing; however, the

MPO may choose to hold a hearing. The Major Amendment project is put on the agenda for

discussion and action at TCC, TAQC and the ARC Board.

'

The Major Amendment process for areas with less than "500,000 in population requires public advertisement, a IS-day comment period, and response to all comments, either individually or in a summary form. There is no requirement for a public hearing. The Major Amendment follows the usual CAC, TCC and PC process for action.

The MPO is responsible for notification to aDOT and FHWAIFTA of action taken and assuring that

the
\

Major

Amendment

process

and

public

involvement

procedures

have

been
.

followed..

STIP (Statewide Transportation Improvement Program) Administrative Changes The following actions are eligible as Administrative Changes to the STIP:
Project number change or Project identification number change. Splitting or combining projects. Increase in Lump Sums by less than 20%. Fund source change. Obvious minor data entry errors. Minor change in expenditures for transit projects Changes or clarifying elements of a project description (with no change in funding). This
would generally be less than 10% change in-project termini. This change would not alter the original project intent.

The STIP Administrative Change process consists of notification to all involved parties in'the latest version of the Department's Construction Work Program. No public involvement process is required in such instances. If an administrative change is made at the time of submittal of a project for authorization, that form will serve as such notice.

STIP (State Transportation Improvement Program) Minor Amendments

A Minor Amendment to the STIP would include the following.

Shifting projects within the STIP.

Move PE, ROW or Construction Funds programmed to another year of the STIP

The deletion of a project at the request of the Project Sponsor.
f.:......



~

.

Increase in Lump Sums project amounts by more than 20%.

L,,:,Y

Shifting Construction funds to add a PE or ROW phase to a project

Addition or deletion of projects shown on the TIP Minor Amendment list

10

Increase funding more than 20% for a Lump sum category (maintenance, safety, PE, hazard elimination, RJR crossing etc.)

':

Written notification is submitted to the FHWA showing the change made and stating the source of

funding assuring that the financial balance of the STIP is maintained. Cost changes made to the

second and third years of the STIP will be balanced during the STIP yearly update process. Minor

and Major amendments to the STIP are denoted as addenda and consecutively numbered.

STIP (State Transportation Improvement Program) Major Amendments Major amendments to the STIP would include the following:
Addition of an annual TIP. Addition or deletion of projects on the TIP Major list. Major change to scope of work of an existing project. A major change would be any
change that alters' the original project intent i.e. a change in the number of through lanes, a change in termini of more than 10 percent, or a change in location.
The Department places the public advertisement, with a 15-day comment period, and responds to all comments, either individually or in summary form. For a STIP amendment that is solely inclusion of an approved TIP or approved amended TIP, a further public involvement process is not required because the MPO conducts a process prior to State approval.
An amendment will be submitted to FHWA requesting approval of the addition or change made and stating the source of funding to maintain a balanced STIP. Cost changes; made to the second and third year of the STIP will be balanced during the STIP yearly update process. The Department assures that the Major Amendment process and the public involvement procedure was followed.
Notes: 1) An amendment to the STIP or TIP is not necessary for adding individual projects from Lump sum categories as long as they are consistent with the category definitions. . 2) The date at which a TIP becomes effective is when the Governor or his designee approves it.
3) The date at which a STIP becomes effective is when FHWA and FTA approve it.
4) The STIP is developed on the state fiscal year, which begins July 1. 5) For cost increases> 50% for a project with the STIP cost under $1,000,000 andfor cost increases> 20% or $1 million (whichever is greater) for projects costing over $1,000,000 will be handled as a minor amendment. Notification will be sent to the project sponsor and the MPO as appropriate when a project is shifted within the STIP as a result of these amendments.
STIP Financial Plan Final

j
t< ''\
lY
11

LUMP SUM FUNDING

A portion of the STIP funding is set aside for five groups of projects that do not affect the capacity of the roadway. Funds are set up in lump sum categories to undertake projects that are developed after ,the STIP is approved. These lump sums are listed in a number of funding types for each year for the Department's convenience in managing the funding. Funds are drawn from theselump sums during the year and individual projects are programmed. The individual projects may include work at one or several locations for letting and accounting purposes. Listed below are these five groups and information about them. The total available fundsare shown as construction but preliminary engineering and rights-of-way may be drawn from this amount when needed.

Group: maintenance

Criteria: maintenance. only

This group has six funding/work types: two are for bridge painting/maintenance and the other four are for roadway maintenance. Major types of work .undertaken are: resurfacing, pavement rehabilitation, median work, impact attentuators, signing, fencing, pavement markings, landscaping, rest areas, walls, guardrail' and shoulder work. Also included is .. preliminary engineering necessary' to prepare plans and rights-of-way needed for things like landslide repair, sewer hookups and erosion control.

Group: safety

Criteria: work qualifying for the High Hazard Safety Program

This group has four funding/work types: signal installation/upgrades, guardrail installation, sign installation, railroad protection devices, railroad crossing hazard elimination, roadway hazard elimination and special safety studies and programs.

Group: preliminary engineering

Criteria: planning, management systeins and consultant design services

This group has two funding/work types: planning/management systems and consultant design. services

Group: wetland mitigation

Criteria: site restoration for projects already under construction/complete and wetland banks

This group is a single item.

Group: roadway/interchange lighting

(

Criteria: lighting

~..~.~ .:. ..:

.:.':
...

This group is a single item.

Understandihg STIP Entries
Typical project

This is the PI or Project Identification number used throughout the life of the project for tracking purposes.

Preliminary Engineering Year that funding became available for this phase.

DRAFT STATE TRANSPORTATION IMPROVEMENT PROGRAM

Friday, March 12,2000 Page 20 of 221

Type of work, replacement of an existing bridge. See Glossary of Terms for further definitions. _

Funding type: third item on top line. May be Bridge, STP, NHS, etc. & refers to specific type of federal funds to be used.
Project description: State route 90 at Little House Creek approximately 1.7 miles south of Fitzgerald. Passing lane projects may only indicate milepost numbers.

..

.;

..

Federal share of construction. Georgia share of construction.

Construction. The DOT is scheduled to let to construction after 2002.

Right of Way to be purchased after 2002.

If dollar amount is shown, that is the

federal funding; if LOCL is shown, right

of way to be purchased by local

.

government.

\I

BICYCLE AND PEDESTRIAN ENHANCEMENTS :
;
HIGHWAYS AND BRIDGES MAINTENANCE SAFETY TRANSIT
....
I I
.
f: :.-
~hJ;

County

Appling

Atkinson

Bacon

Baker

Baldwin

Banks

Barrow

Bartow

Ben Hill

Berrien

Bibb

Bleckley

Brantley

Brooks

Bryan

Bulloch

Burke

Butts

Calhoun

Camden

Candler

Carroll

.

Catoosa

Charlton

Chatham

a-

Chattahoochee

Chattooga

Cherokee

Clarke

Clay

Clayton

Clinch

Cobb

Coffee

Colquitt

Columbia

Cook

Coweta

Crawford

Crisp

Dade

Dawson

Decatur

Dekalb

Dodge

t :. s~;..
~:;:/

Dooly Dougherty

Page 25 26 27 28 29 31 32 34 37 38 39 47 48 49 50 51 52 53 55 56 58 59 61 63
64 70 71 72 77 81 82 87 88 95 97 99 102 103 106 107 .
108 109 110 111 118 119 120

County

Douglas

Early

Echols

Effingham

Elbert

Emanuel

Evans

Fannin

Fayette

Floyd

Forsyth

Franklin

Fulton

Gilmer

Glascock

Glynn

Gordon

Grady

Greene

Gwinnett

Habersham

Hall

Hancock

Haralson

Harris

Hart

Heard

Henry

Houston

Jackson

Jasper

Jeff Davis

Jefferson

Jenkins

'\ ,

Johnson

Jones

Lamar ,

Lanier

Laurens

Lee

Liberty

Lincoln

Long

Lowndes

Lumpkin

Macon

Madison

Page
123 127 128 129 131 132 134 135 136 139 143 145 146 183 184 185 188 190 191 193 199 201 204 205 207 209 210 211 215 218 220 221 222 224 225 226 227 228 229 232 233 235 236 237 239 240 241

, County

Marion

McDuffie

.' McIntosh

Meriwether

. Miller

Mitchell

Monroe

Montgomery

Morgan

Murray

Muscogee

Newton

Oconee

Oglethorpe

Paulding

. Peach

Pickens

Pierce

Pike

Polk

Pulaski

Putnam

Quitman

Rabun

Randolph

Richmond

Rockdale

Schley

Screven

Seminole

.Spalding

Stephens

Stewart

Sumter

Talbot

Taliaferro

Tattnall

Taylor

Telfair

Terrell

Thomas

Tift

Toombs

Towns

Treutlen

f'~,.

Troup

6~~

Turner

Page
242 243 244 245 247 248 249 251 252 253 254 259 262 263 264 265 267 268 269 270 272 '273 275 276 277 278 282 285 286 287 ,288
, ,. 291 292 293 295 296 297 298
~299
301 302 303 305 307 308 309 311

County Twiggs Union Upson Walker Walton Ware Warren Washington Wayne Webster Wheeler White . Whitfield Wilcox Wilkes Wilkinson Worth

Page
313 314 315 317 318 320 322 323 325 .327 328 329 330 332 333 334 336
..
,~
,f

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

ALL COUNTY
PROJECT: 0000064 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: INTERSTATE WILDFLOWER PROGRAM

FUND: STP
0/0.00

PE: 200 I ROW: LOCL CST: 2001 . FED Share: GA Share:

$40,000
$460,000 $368,000
$92,000

PROJECT: 0000065 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: INTERSTATE GATEWAY LANDSCAPING FY 2000

FUND:STP
0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share: GA Share:

$1,250,000 $1,000,000
$250,000

PROJECT: 0000066 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: INTERSTATE GATEWAY LANDSCAPING FY 2001

FUND: STP
0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share: GA Share:

$1,250,000 $1,000,000
$250,000

PROJECT: 0000295 TYPE WORK: SIGNING

FUND: STP

PE: 2001

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: APPALACHIAN FOOTHILLS PARKWAY-FABRICATE & INSTALL LOGO SIGNS

CST: 2001

FED Share:

GA Share:

$50,000
$300,000 $240,000
$60,000

PROJECT: 0000348 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STATE LENGTH (miles / km) 0/0.00
DESCRPT: TASK ORDER CT-CONSULTANT ENGINEERING & INSPECTION GRIP $FYOI

PE:NONE ROW: NONE CST: 2001

GA Share:

$3,000,000 $3,000,000

PROJECT: 0000349 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STATE LENGTH (miles / km) 0 /0.00
DESCRPT: TASK ORDER CT-CONSULTANT ENGINEERING & INSPECTION GRIP $FY02

PE:NONE ROW: NONE CST: 2002

GA Share:

$3,000,000 $3,000,000

PROJECT: 0000350 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STATE LENGTH (miles / km) 0/0.00
DESCRPT: TASK ORDER CT-CONSULTANT ENGINEERING & INSPECTION GRIP $FY03

PE.'NONE ROW: NONE CST: 2003

GA Share:

$3,000,000 $3,000,000


f- "
l,

PROJECT: 0000372 TYPE WORK: ATMS/ITS

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: ATMS: VARIABLE MESSAGE SIGNS AT WEIGH STATIONS NEAR ATLANTA

PE: 2000 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$1,500,000 $1,350,000
$150,000

Page J of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

ALL COUNTY

PROJECT: 0000395 TYPE WORK: ,SPECIAL STUDIES

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: VALUE E1'!GINEERING STUDIES FOR NHS PROJECTS COSTING OVER 25 M

PE: 2001 ROW: NONE CST: NONE

$2,400,000

PROJECT: 000q694 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) 0/0.00
DESCRPT: OPERATE STATE AGENCY WIDE COMMERCIAL VEHICLE PERMIT SYSTEM

PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:

$3;000,000 $2,400,000
$600,000

PROJECT: 0000782 TYPE WORK: PRELIMINARY ENGINEERING

FUND: STATE

LENGTH(miles / km) 0/0.00

DESCRPT: SUBSURF~CE. UTILITY ENGINEERING CONSULTANT SERVICES - GRIP,

PE: 2001 ROW: NONE CST: NONE

$1,000,000

PROJECT: 0000806 TYPE WORK: PRELIMINARY ENGINEERING

FUND: MIN. GUARAN PE: 2000

UNDERWAY

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: SOIL SURVEYS; BRIDGE FOUND.; HAZARD STUDIES BY CONSULTANT

CST: NONE

LUMP SUM PROJECT

.

PROJECT: 0000839 TYPE WORK: ATMS/ITS

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: ATMS/ INSTALL ITS COMPONENTS OF COASTAL GA EVACUATION PLAN

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$4,627,000 $3,701,600
$925,400

PROJECT: 0000840 TYPE WORK: PRELIMINARY ENGINEERING

FUND: BRIDGE

LENGTH (miles / km) 0/0.00

DESCRPT: DESIGN OF 40 BRIDGES OUTSIDE THE ATLANTA MPO-CT 4 - PE ONLY,

PE: 2001' ROW: NONE CST: NONE

$9,999,000

PROJECT: 0000841 TYPE WORK: PRELIMINARY,ENGINEERING

FUND: BRIDGE

LENGTH (miles / km) 0/0.00

DESCRPT: DESIGN OF 40 BRIDGES OUTSIDE THE ATLANTA MPO-CT 5 - PE ONLY

" PE: 2002 ROW: NONE CST: NONE

$9,999,000

PROJECT: 0000863 TYPE WORK: SIGNALS

FUND:,sTP

LENGTH (miles / km) , 0/0.00

r' '.~

DESCRPT: CONSULTANT SERV FOR TRAFFIC SIGNAL DESIGN STATEWIDE/PH 4~PE LUMP SUM PROJECT

~2:~;:j:'

PE:2000 ROW: NONE .CST: NONE

UNDERWAY

Page 2 0/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

,----------_._*. 9/21/00

_-""-_..-.;-~-."'..."

ALL COUNTY

PROJECT: 0001015 TYPE WORK: PRELIMINARY ENGINEERING

FUND: STATE

LENGTH (miles / km) 0/0.00

DESCRPT: ENVIRONMENTAL ANALYSIS ON GRIP PROJECTS BY CONSULTANT

LUMP SUM PROJECT

PE: 2000 ROW: NONE CST: NONE

UNDERWAY

PROJECT: 0001016 TYPE WORK: PRELIMINARY ENGINEERING

FUND: STATE

LENGTH (miles / km) 0/0.00

DESCRPT: ENVIRONMENTAL ANALYSIS ON STATE-AID PROJECTS BY CONSULTANT

LUMP SUM PROJECT

PE:2000 ROW: NONE CST: NONE

UNDERWAY

PROJECT: 0001135 TYPE WORK: SIGNALS LENGTH (miles / km)
DESCRPT: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN DIST 3 LUMP SUM PROJECT

FUND:STP 0/0.00

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$500,000 $400,000 $100,000

PROJECT: 04MOOI- TYPE WORK: RESURFACE & MAINTENANCE

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM FOR INTERSTATE MAINTENANCE FOR FY 2001

PE: 2001 ROW: NONE CST: 2001 FED Share: GA Share:

$200,000
$6,557,000 $5,901,300
$655,700

:;

'~~" -
PROJECT: 04M002- TYPE WORK: RESURFACE & MAINTENANCE

FUND: 1M

PE: 2002

$200,000

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: LUMP SUM FOR INTERSTATE MAINTENANCE FOR FY 2002

CST: 2002

$20,000,000

FED Share:

$18,000,000

GA Share:

$2,000,000

PROJECT: 04M003- TYPE WORK: RESURFACE & MAINTENANCE

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM FOR INTERSTATE MAINTENANCE FOR FY 2003

PE: 2003 ROW: NONE CST: 2003 FED Share: GA Share:

$200,000
$20,000,000 $18,000,000
$2,000,000

PROJECT: 04MBOl- TYPE WORK: BRIDGES

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2001

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$7,000,000 $6,300,000
$700,000

_...
. . . .. C!:~. ':'~
}.-
~J~'

PROJECT: 04MB02- TYPE WORK: BRIDGES

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 200i

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$5,000,000 $4,500,000
$500,000

Page 3 0/336

_ _ _'""n

STATE TRANSPORTATIO. N IMPROVEM. ENT PROGRAM





.. " _ .

9/21/00

.,.--.._. ,._.



~.....

ALL COUNTY

PROJECT: 04MB03- TYPE WORK: BRIDGES

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2003 .

PE:N0.NE ROW: NONE CST: 2003 FED Share: GA Share:

.. "'_ _
$2,000,000 $1,800,000
$200,000

PROJECT: 171540- TYPE WORK: BRIDGE PAINTING

FUND: STP .

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: BRIDGE PAINT IN CLARKE-FRANKLIN-JACKSON-STEPHENS-WALTONIY540

CST: 2001

LUMP SUM PROJECT

FED Share: .

ASSOCIATED PROJECTS: 17Y540-

GA Share:

$303,000 $242,400
$60,600

PROJECT: 17Y540- TYPE WORK: BRIDGE PAINTING

FUND: 1M

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: BRIDGE PAINT IN CLARKE-FRANKLN-JACKSON-STEPHNS-WALTONII 7 I 540 .:

CST: 2001

LUMP SUM PROJECT

FED Share: .

ASSOCIATED PROJECTS: 171540-

GA Share:

$104,000 $93,600 $10,400

PROJECT: IB9005- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

LENGTH (miles / km)

0/0.00

ROW: NONE

DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 16 COUNTIES/CITIES IN NE GA.

CST: 2001

FED Share:

OTHShare:

PROJECT: IB9006- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 16 COUNTIES/CITIES IN NE GA

CST: 2002

FED Share:

OTHShare:

PROJECT: I C9005- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: VEHICLES- RADIOS- BASE STATIONS- COMPUTERS- ETC.

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTH Share:

PROJECT: IC90067 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTHShare:

lj:(i.':

PROJECT: 271175- TYP~ WORK: BRIDGE PAINTING

FUND: STP

PE: NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: "BR"PAINT IN BALDWNIBLCKLY/GREN/HANCKlJASPRIMORGINEWTN/RCHMD CST: 2001

LUMP SUM PROJECT

FED Share:

ASSOCIATED PROJECTS: 27Y175-

GA Share:

$438,000 $219,000
~
$219,000
"
$460,000. $230,000
$230,000
$239,000 $212,000
$27,000 $27,000
$11 1,000 $99,000 $12,000 $12,000 I
$185,000 $148,000 . $37,000

Page 4 0/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _ _ _ _ _ _ _O

9/21/00

Jidi_._ _~,_ $I

.~.

_

ALL COUNTY

PROJECT: 27Y175- TYPE WORK: BRIDGE PAINTING

FUND: 1M

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: "BR"PAINT IN BALDWN/BLCKLYIGRENIHANCKlJASPRIMORGINEWTNIRCHMD CST: 200 I

LUMP SUM PROJECT

FED Share:

ASSOCIATED PROJECTS: 271175-

GA Share:

$50,000 $45,000
$5,000

PROJECT: 2B9005- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 0 /0.00

ROW: NONE

DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 22 COUNTIES/CITIES IN E. GA.

CST: 2001

FED Share:

$1,040,000 $520,000

OTH Share:

PROJECT: 2B9006- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

. LENGTH (miles / km) 0 /0.00

ROW: NONE

DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 22 COUNTIES/CITIES IN E. GA

CST: 2002

FED Share:

$520,000
$1,110,000 $555,000

OTHShare:

$555,000

PROJECT: 2C9005- TYPE WORK: CAPITAL

FUND: TRANSIT

PE: NONE

LENGTH (miles / km) 0 10.00

ROW: NONE

DESCRPT: VEHICLES RADIOS- BASE STATIONS- COMPUTERS- ETC.

CST: 2001

$988,000

FED Share:

$878,000

GA Share:

$110,000

<i:
~'.

OTH Share:

$110,000

PROJECT: 2C9006- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTH Share:

$448,000 $398,000
$50,000 $50,000

PROJECT: 312180- TYPE WORK: BRIDGE PAINTING

FUND: 1M

LENGTH (miles/km) 0/0.00

DESCRPT: BRIDGE PAINTING IN BIBB-HOUSTON-MACON-PEACH COUNTIES/3IYI80

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 31Y180-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$270,000 $243,000
$27,000

.
f'
t:;~~

PROJECT: 312185- TYPE WORK: BRIDGE PAINTING

FUND: 1M

LENGTH (miles / km) 0 10.00

DESCRPT: BRIDGE PAINTING IN HENRY-PEACH-TALBOT-TROUP COUNTlES131YI85

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 31Y185-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

PROJECT: 315001- TYPE WORK: RESURFACE & MAINTENANCE

FUND:NHS

LENGTH (mileslkm) 010.00

DESCRPT: LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 2001

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$403,000 $362,700
$40,300
$17,360,000 $13,888,000
$3,472,000

PageS 0/336
----- ---- - - - - -

---_._-_._-----
STATE TRANSPORTATION IMPROVEME.NT PROGRAM

9121100
_ _ _ _ _ _...

10 lll:



. , _ , . _ ,.. ,

.._*"'- ..

..

,,~. ~ ""~

ALL COUNTY

PROJECT: 315002- TYPE WORK: RESURFACE & MAINTENANCE

FUND: NHS

LENGTH (miles I km) 0/0.00

DESCRPT: LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 2002

PE:NONE ROW: NONE CST: 2002 FED Shure: GA Shure:'

$37,500,000 $30,000,000 $7,500,000

PROJECT: 315003- TYPE WORK: RESURFACE & MAINTENANCE

FUND: NHS

." LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 2003

PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:

$37,500,000 $30,000,000
$7,500,000

PROJECT: 315UOI- TYPE WORK: LIGHTING

FUND:NHS

. LENGTH (miles / km) 0 10.00

DESCRPT: LUMP SUM INTERCHANGE/ROADWA Y LIGHTING FOR FY 2001

PE:NONE , ROW: NONE
CST:200i FED Shure:
GA Share:

$1,000,000 $800,000 $200,000

PROJECT: 315U02- TYPE WORK: LIGHTING

FUND:NHS

LENGTH (miles r km) 0/0.00 .

DESCRPT: LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 2002

PE:NONE . ROW: NONE
CST: 2002 FED Share:
GA Share:

. $] ,000,000 . $800,000 $200,000

PROJECT: 3 I5U03- TYPE WORK: LIGHTING

FUND: NHS

LENGTH (miles I km) 0 10.00

DESCRPT: LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 2003

PE."NONE ROW: NONE CST: 2003 FED Share: GA Share:

$1,000,000 $800,000 $200,000

PROJECT: 31Y I80- TYPE WORK: BRIDGE PAINTING

FUND: STP

.

LENGTH (miles I km)

0/0:00 .

DESCRPT: BRIDGE PAINTING IN BIBB-HOUSTON-MACON-PEACH COUNTlES/312180

LUMPSUM PROJECT

ASS'OCIATED PROJECTS: 312180-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$35,000 $28,000
$7,000

PROJECT: 31YI85- TYPE WORK: BRIDGE PAINTING

FUND: STP

LENGTH (miles I km) 0 10.00

DESCRPT: BRIDGE PAINTING IN HENRY-PEACH-TALBOT-TROUP COUNTlES/3 12185

'LUMP SUM PROJECT

ASSOCIATED PROJECTS: 312185-

PE:NONE ROW: NONE CST: 200] FED Share: GA Share:

$272,000 $217,600
$54,400

PROJECT: 33AOOI- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

PE:NONE

I

LENGTH (miles I km) . 0 10.00

ROW: NONE

DESCRPT: LUMP SUM ALL SAFETY FUNDS FOR FY 200 I

CST: 2001

$5,000,000

FED Share:

$4,500,000

GA Share:

$500,000

Page 6 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _ _ _ _ _ _ _ _ _ _ _ _Ol. ...





_ 9/21/00

ALL COUNTY
PROJECT: 33A002- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: LUMP SUM ALL SAFETY FUNDS FOR FY 2002

FUND: STP 0/0.00

PE: NONE ROW: NONE CST: 2002 FED'Share: GA Share:

$2,294,000 $2,064,600
$229,400

PROJECT: 33A003- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles/km)
DESCRPT: LUMP SUM ALL SAFETY FUNDS FOR FY 2003

FUND: STP 0/0.00

PE: NONE ROW: NONE CST: 2003 FED Share: GA Share:

$2,500,000 $2,250,000
$250,000

PROJECT: 33COOI- TYPE WORK: RESURFACE & MAINTENANCE

FUND: STP

.LENGTH (miles / km) 0 /0.00

DESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA GT 200K FY 2001

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$5,636,000 $4,508,800 $1,127,200

PROJECT: 33C002- TYPE WORK: RESURFACE & MAINTENANCE

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA GT 200K FY 2002

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$7,500,000 $6,000,000 $1,500,000

PROJECT: 33C003- TYPE WORK: RESURFACE & MAINTENANCE

FUND: STP

LENGTH (miles / km) 0/0.00

IJESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA GT 200K FY 2003

PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:

$7,500,000 $6,000,000 $1,500,000

PROJECT: 33DOOI- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA FY 200 I

FUND:STP 0/0.00

PE:2001 ROW: NONE CST: 2001 FED Share: GA Share:

$700,000
$2,740,000 $2,192,000
$548,000

PROJECT: 330002- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA FY 2002

FUND:STP 0/0.00

PE:2002 ROW: NONE CST: 2002 FED Share: GA Share:

$700,000
$30,000,000 $24,000,000
$6,000,000

,
f" ~L;~;:

PROJECT: 33D003- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA FY 2003

FUND:STP 0/0.00

PE: 2003 ROW: NONE CST: 2003 FED Share: GA Share:

$700,000
$40,000,000 $32,000,000
$8,000,000

Page 70/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_

... , . " . . . . . . - _ - _ .

_ _ ....
~

9/21/00
._.D Z I ;... ~

,_ _. _ .

.._ . . . .



""..,""_~

.. ,..

ALL COUNTY

PROJECT: 33DBOI- TYPE WORK: BRIDGES

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR FY 2001

PE:NONE ROW: NONE CST: 2001 FED Share: GAShare:

$16,000,000 $12,800,000
$3,200,000

PROJECT: 33DB02- TYPE WORK: BRIDGES

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR FY 2002

PE:NONE ROW: NONE CST: 2002' FED Share: GA Share:

$5,000,000 $4,000,000 $1,000,000

PROJECT: 33DB03- TYPE WORK: BRIDGES

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP ~UM BRIDGE MAINTENANCEIPAINTING J:OR FY 2003

PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:

$5,000,000 $4,000,000 $1,000,000

PROJECT: 33DMOI-. TYPE WORK: SPECIAL STUDIES

FUND: STP

LENGTH (miles / km) . 0/0.00

DESCRPT: LUMP SUM T~NSPORTATION PLANNING & MANAGEMENT SYST~MS

PE: 2001 1l0W:NONE CST:NONE .

$1,840,000

:!

PROJECT: 33DM02- TYPE WORK: SPECIAL STUDIES

FUND:STP

LENGTH.(miles/km) 0/0.00

DESCRPT: LUMP .SU,M TRANSPORTATION PLANNING & MANAGEMENT SYSTEMS

PE: 2002

$2,000,000

~

ROW: NONE

. CST: NONE

PROJECT: 33DM03- TYPE WORK: SPECIAL STUDIES

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM TRANSPORTATION PLANNING & MANAGEMENT SYSTEMS

PE: 2003 ROW: NONE CST: NONE

$2,000,000

PROJECT: 33DWOI- TYPE WORK: WATER POLLUTION MITIG.FUND:'$TP

.

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP S~M WETLAND MITIGATION SITE PURCHASE/RESTORATION 2001

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$5,041,000 $4,032,800 $1,008,200

PROJECT: 33DW02- TYPE WORK: WATER POLLUTION MITIG.

FUND: STP .'

PE:NONE

,

LENGTH (miles /km) 0/0.00

ROW: NONE

DESCRPT: LUMP SUM WETLAND MITIGATION SITE PURCHASE/RESTORATION -2002

CST: 2002

$2,000,000

f" '~,
lit

FED Share: GA Share:

$1,600,000 $400,000

Page8oj336

,

...,



'.

STATE TRANSPORTATION IMPROVEMENT PROGRAM

n.

... .... ..

gl_"_~"""'

_"'"~

9/21/00
9"""'_~~:_"'

~~_.,_""

0' ",.,- _

ALL COUNTY

PROJECT: 33DW03- TYPE WORK: WATER POLLUTION MITIG.

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM WETLAND MITIGATION SITE PURCHASE/RESTORATION -2003

PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:

$2,000,000 $1,600,000
$400,000

PROJECT: 33MSOI- TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: LUMP SUM R.RX PROTECTION DEVICE FOR FY 200\

FUND:STP 0/0.00

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$5,976,000 $5,378,400
$597,600

PROJECT: 33MS02- TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: LUMP SUM R.RX PROTECTION DEVICE FOR FY 2002

FUND:STP 0/0.00

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$2,600,000 $2,340,000
$260,000

PROJECT: 33MS03- TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: LUMP SUM R.RX PROTECTION DEVICE FOR FY 2003

FUND:STP 0/0.00

PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:

$2,600,000 $2,340,000
$260,000

PROJECT: .33NSOI- TYPE WORK: RR XING

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM RAILROAD CROSSING HAZARD ELlMINA TION FY 200 I

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$6,811,000 $6,129,900
$681,100

PROJECT: 33NS02- TYPE WORK: RR XING

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: LUMP SUM RAILROAD CROSSING HAZARD ELlMINA TION FY 2002

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share: .

$2,600,000 $2,340,000
$260,000

,
rr ';
~c ~;:

PROJECT: 33NSOJ- TYPE WORK: RR XING

FUND: STP

LENGTH (miles/km) 0/0.00

DESCRPT: LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION FY 2003

PROJECT: 371720- TYPE WORK: BRIDGE PAINTING

FUND: STP

LENGTH (miles/km) 0/0.00

DESCRPT: BRIDGE PAINTING IN MUSCOGEE-SUMTER-TALBOT-TAYLOR COUNTIES

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 37Y720-

PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:
PE:NONE ROW: NONE CST: 2001 FEDSlJare: GA Share:

$2,600,000 $2,340,000
$260,000
$210,000 $168,000
$42,000

Page 90[336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

.. -------~------_ .._----- 9/21/00 ------"'------=------

ALL COUNTY

PROJECT: 37Y720- TYPE WORK: BRIDGE PAINTING
LENGTH (miles i km)

FUND: 1M 0/0.00

DESCRPT: BRIDGE PAINTING IN MUSCOGEE-SUMTER-TALBOT- TAYLOR COUNTIES

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 371720-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$70,000 $63,000 $7,000

PROJECT: 3B9005- TYPE WORK: OPERATING

FUJVD: TRANSIT

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: RURAL ~UBLIC TRANSIT SERVICE IN 17 COUNTIES/CITIES IN MID.GA

CST: 2001

FED Share:

OTH Share:

PROJECT: 3B9006- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 17 COUNTIES/CITIES IN MID GA

CST: 2002

FED Share:

OTH Share:

PROJECT: 3C9005- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: MODIFIED VAN; MINIBUS WITH LIFT

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTHShare:

PROJECT: 3C9006- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTHShare:

PROJECT: 410715- TYPE WORK: BRIDGE PAINTING

FUND: 1M

LENGTH {miles/ km) 0/0.00

DESCRPT: BRIDGE PA~TING IN COFFEE-COO~-ECHOLS-TIFT COUNTIES/41 Y7 I5

LUMPSUM PROJECT

ASSOCIATED PROJE~TS: 41Y715-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

. $856,000 $428,000 $428,000 $990,000 $495,000 $495,000
$649,000 $584,100
$64,900

PROJECT: 41Y715- TYPE WORK: BRIDGE PAINTING

FUND: STP

. LENGTH (miles / km) 0/0.00

DESCRPT: BRIDGE PAINTING IN COFFEE-COOK-ECHOLS-TIFT COUNTIES/410715

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 410715-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

PROJECT: 471410-. TYPE WORK: BRIDGE PAINTING

FUND: STP

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: BRIDGE PAINTING IN CRISP-DECATUR-DOUGHERTY COUNTIES/47Y410

CST: 2001

c;

LUMP SUM PROJECT

FED Share:

L;;~~~ ASSOCIATED PROJECTS: 47Y410-

GA Share:

Page 10 0[336

------------_._--,._ __ STATE TRANSPORTATION IMPROVEMENT PROGRAM' 9/21/00
....... --------------~-------

.. .

ALL COUNTY

PROJECT: 47Y410 TYPE WORK: BRIDGE PAINTING

FUND: 1M

LENGTH (miles I km} 0 10.00

DESCRPT: BRIDGE PAINTING IN CRISPDECATUR-DOUGHERTY COUNTIES/471410

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 471410-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$219,000 $197,100
$21,900

PROJECT: 4B9005- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

LENGTH (miles I km) 010.00

ROW: NONE

DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 7 COUNTIES/CITIES IN S.W. GA

CST: 2001

FED Share:

OTH Shure:

PROJECT: 4B9006- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

LENGTH (miles I km) 0 10.00

ROW: NONE

DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 7 COUNTIES/CITIES IN S.W. GA

CST: 2002

FED Shure:

OTH Share:

PROJECT: 4C9005- TYPE WORK: CAPITAL LENGTH (miles I km)
DESCRPT: VEHICLES- RADIOS- BASE STATIONS COMPUTERS- ETC.

FUND: TRANSIT

PE: NONE

010.00

ROW.' NONE

CST: 2001

FED Share:

GA Shure:

OTH Share:

PROJECT: 4C9006- TYPE WORK: CAPITAL LENGTH (miles I km)
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC.

FUND: TRANSIT

PE: NONE

010.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTH Shure:

PROJECT: 511395- TYPE WORK: BRIDGE PAINTING

FUND: 1M

LENGTH (miles I km) 0 10.00

DESCRPT: BRIDGE PAINTING IN APPLING-CHARLTON-CHA THAM-GLYNN CO/51 Y395

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 51Y395-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$198,000 $99,000 $99,000
$210,000 $105,000 $105,000
$368,000 $327,000
$41,000 $41,000
$102,000 $91,000 $11,000 $11,000
$180,000 $162,000
$18,000

,
__:;f~
~l

PROJECT: 51Y395 TYPE WORK: BRIDGE PAINTING

FUND: STP

LENGTH (miles I km) 0 10.00

DESCRPT: BRIDGE PAINTING IN APPLING-CHARLTON-CHATHAM-GLYNN CO/51 1395

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 511395-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

PROJECT: 5B9005- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

LENGTH (miles I km) 0 10.00

ROW: NONE

DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 5 COUNTIES IN S.E. GA.

CST: 2001

FED Share:

OTH Share:

$101,000 $80,800 $20,200
$300,000 $150,000 $150,000

Page JJ of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
-...""------ ,,------_._--- 9/21/00 . ,----~_ ..._.------"""""-~--...._""-----_._-------

ALL COUNTY

PROJECT: 5B9006- TYPE WORK: OPERATING

FUND: TRANSIT

PE: NONE

.0

LENGTH (miles / km) 0/0.00

ROW.; NONE

DESCRPT: RURAL PUBLIC TRANSIT IN 5 COUNTIES/CITIES IN S.E. GA

CST: 2002

$260,000

FED Share:

$130,000

OTHShare:

PROJECT.~ 5C9005- TYPE WORK: CAPllAL LENGTH (miles / km)
DESCRPT: VEHICLES- RADIOS- BASE STATIONS- COMPUTERS- ETC.

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTHShare:

PROJECT: 5C9006- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC.

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTH Share:

PROJECT: 611285-, TYPE WORK: BRIDGE PAINTING

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT:, BRIDGE PAINTING IN BARTOW-CHEROKEE-GORDON COUNTIES/6IY285

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 61 Y285-

PE:NONE ROW.; NONE
CST: 2001 FED Share:
GA Share:

$130,000
$475,000 $422,000
$53,000 $53,000
$136,000 $121,000
$15,000 .$15,000
$815,000 $733,500 $81,500

PROJECT: 61Y285- TYPE WORK: BRIDGE PAINTING

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: BRIDGE PAINTING IN BARTOW-CHEROKEE-GORDON COUNTIES/611285

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 611285-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$163,000 $130,400
$32,600

PROJECT: 671190- TYPE WORK: BRIDGE PAINTING LENGTH (miles / km)

FUND: STP

0 /0.00

.'

PE:NONE ROW: NONE

DESCRPT: BRIDGE PAINT IN CATOOSA-DADE-FANNIN-MURRAY COUNTIES/67Y 190

CST: 2001

LUMP SUM PROJECT

FED Share:

ASSOCIATED PROJECTS: 67Y190-

GA Share:

$233,000 $186,400 $46,600

PROJECT: 671195- TYPE WORK: BRIDGE PAINTING

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: BRIDGE PAINT IN CARROLL-FLOYD-PAULDING-POLK COUNTIES/67YI95

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 67Y195

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$354,000 $283,200 $70,800

PROJECT: 67Y190 TYPE WORK: BRIDGE PAINTING

FUND: 1M

PE:NONE

,

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: BRIDGE PAINT IN CATOOSA-DADE-FANNIN-MURRAY COUNTIES/671 190

CST: 2001

$143,000

LUMP SUM PROJECT

FED Share:

$128,700 .

ASSOCIATED PROJECTS': 671190-

GA Share:

$14,300

Page 12 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _ _ _ _ _ _ _ _ _ _ _ _ _

9/21/00

" - - _.... _ _..... _

IS<

.,.._

,----~-------

ALL COUNTY

PROJECT: 67Y195- TYPE WORK: BRIDGE PAINTING

FUND: 1M

LENGTH (miles I km) 0 10.00 DESCRPT: BRIDGE PAINT IN CARROLL-FLOYD-PAULDING~POLK COUNTIES/67 I 195

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 671195-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$318,000 $286,200
$31,800

PROJECT: 6B9005- TYPE WORK: OPERATING

FUND: TRANSIT

PE.'NONE

LENGTH (miles I km) 0/0.00

ROW: NONE

DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 15 COUNTIES/CITITES IN NW GA

CST: 2001

FED Share:

$1,108,000 $554,000

OTH Share:

PROJECT: 6B9006- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

LENGTH (miles I km) 0/0.00

ROW: NONE

DESCRPT: RURAL PUBLIC TRANSIT IN 15 COUNTIES/CITIES IN N.W. GA

CST: 2002

FED Share:

$554,000
$1,134,000 $567,000

OTHShare:

$567,000

PROJECT: 6C9005- TYPE WORK: CAPITAL LENGTH (miles I km)
DESCRPT: VEHICLES-RADIOS-BASE STATIONS-CPMPUTERS-ETC.

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTHShare:

'-.
PROJECT: 6C9006- TYPE WORK: CAPI,TAL

FUND: TRANSIT

PE: NONE

LENGTH (miles I km) 0/0.00

ROW: NONE

DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC.

CST: 2002

FED Share:

GA Share:

OTHShare:

$666,000 $592,000
$74,000 $74,000
$357,000 $3 I 7,000
$40,000 $40,000

PROJECT: 821055- TYPE WORK: BRIDGE REHAB

FUND: STP

LENGTH (mites I km) 0/0.00

DESCRPT: OFF SYSTEM PILE ENCASEMENT PROJECT TO REPAIR 4 BRIDGES

PE: 1996 ROW: NONE CST: 2003 FED Share: GA Share:

UNDERWAY
$50,000 $40,000 $10,000

PROJECT: 82 I 070- TYPE WORK: ATMS/ITS LENGTH (miles I km)
DESCRPT: ATMS/ ROADWAY WEATHER INFORMATION SYSTEM

FUND: NHS 0/0.00

PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$4,597,000 $3,677,600
$919,400

to "",-:
~i~:

PROJECT: 860110- TYPE WORK: PRELIMINARY ENGINEERING

FUND: HPP

LENGTH (miles I km) 0 10.00

DESCRPT: TRANSPORTATION ALTERNATE STUDY-ATLANTA TO CHATTANOOGA(RURAL) PROPOSED TCM

ASSOCIATED PROJECTS: 86Y110-

PE: 2001 ROW: NONE eST: NONE

$3,875,000

Page J3 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

ALL COUNTY

PROJECT: 870152- . TYPE WORK: PRELIMINARY ENGINEERING

FUND: BRIDGE

LENGTH (miles / km) 0/0.00 DESCRPT: STATEWIDE BRIDGE INVENTORY & INSPECTION FOR 2001 - PE ONLY

PE: 2001 ROW: NONE CST: NONE

$3,800,000

PROJECT: 870153- TYPE WORK: PRELIMINARY ENGINEERING

FUND: BRIDGE

LENGTH (miles / km) 0/0.00

DESCRPT: STATEWIDE BRIDGE INVENTORY & INSPECTION FOR 2002 - PE ONLY

PE: 2002 ROW: NONE CST: NONE

$3,000,000

PROJECT: 870154- TYPE WORK: PRELIMINARY ENGINEERING

FUND: BRIDGE.

LENGTH (miles / km) 0/0.00

DESCRPT: STATEWIDE BRIDGE INVENTORY & INSPECTION' FOR 2003 - PE ONLY

PE: 2003 ROW: NONE CST: NONE

$3,000,000

PROJECT: 870165- TYPE WORK: PRELIMINARY ENGINEERING LENGTH (miles / km)
DESCRPT: TRAINING FOR TEA PROJECTS - 3 YEAR CONTRACT

FUND:STP 0/0.00

PE: 2001 ROW: NONE CST: NONE

$75,000

PROJECT: 870315- TYPE WORK: SIGNING

FUND: STP

,

LENGTH (miles / km) 0/0.00

DESCRPT: SIGNING OF BICYCLE AND PEDESTRIAN ROUTES STATEWIDE

LUMP SUM PROJECT

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$500,000 $450,000 $50,000

PROJECT: 870345 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) 0/0.00
DESCRPT: SIGNAL SOFTWARE PROCUREMENT LUMPSUM PROJECT

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$500,000 $450,000
$50,000 .

PROJECT: 870351- TYPE WORK: SIGNING

FUND: STP

PE: 1999

.

LENGTH (miles/km) 0/0.00

ROW: NONE

DESCRPT: NON-INTERSTATE LIMITED ACCESS HIGHWA Y SIGN UPGRADE STATEWIDE

CST: 2001

.

FED Share:

UNDERWAY
$4,000,000 $4,000,000

PROJECT: 870422- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP

PE:NONE

...

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT - PHASE 2

CST: 2001

$9,000,000

FED Share:

$7,200,000

GA Share:

'$1,800,000

Page l4 of336

STATE TRANSPORTAl,/ON IMPROVEMENT PROGRAM
9/21/00

ALL COUNTY
PROJECT: 870424- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles I km) 0/0.00
DESCRPT: TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT - PHASE 3

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$9,000,000 $7,200,000 $1,800,000

PROJECT: 870426- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: TASK ORDER CONTRACT-CONSULTANT ENGINEERING & INSPECTION PH 4

CST: 2003

FED Share:

GA Share:

$9,000,000 $7,200,000 $1,800,000

PROJECT: 8B9005- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 010.00

ROW: NONE

DESCRPT: DISCRETIONARY OPERATING FOR RURAL PUBLIC TRANSPORTATION PROG

.CST: 200 I

FED Share:

OTH Share:

PROJECT: 8B9006- TYPE WORK: OPERATING

FUND: TRANSIT

PE: NONE

LENGTH (miles I km) 0/0.00

ROW: NONE

DESCRPT: DISCRETIONARY OPERATING FOR RURAL 'PUBLIC TRANSPORTATION PROG

CST: 2002

FED Share:

OTHShare:

PROJECT: 8C9005- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

LENGTH (mileslkm) 0/0.00

ROW: NONE

DESCRPT: DISCRETIONARY CAPITAL FOR RURAL PUBLIC TRANSPORTATION PROG.

CST: 2001

FED Share:

GA Share:

OTHShare:

PROJECT: 8C9006- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

LENGTH (miles I km) 0 10.00

ROW: NONE

DESCRPT: DISCRETIONARY CAPITAL FOR RURAL PUBLIC TRANSPORTATON PROG.

CST: 2002

FED Share:

GA Share:

OTHShare:

PROJECT: 8C9103- TYPE WORK: CAPITAL LENGTH (miles I km)
DESCRPT: PURCHASE OF INTERCITY BUS COACHES

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTH Share:

;.
l.~

PROJECT: 8C9 I04- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: PURCHASE INTERCITY BUS COACHES

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTHShare:

$600,000 $300,000 $300,000
$600,000 $300,000 $300,000
$270,000 $240,000
$30,000 $30,000
$270,000 $240,000
$30,000 $30,000
$1,228,000 $1,091,000
$137,000 $137,000
$1,319,000 $1,172,000
$147,000 $147,000

Page 15 of336

STATE TRANSPORTATION IMPROVEMENT PROGRA.M

d. ..._= .9/21/00

IIII

... _ _ ~

..............."'''' _ _ .. ,

ALL COUNTY
PROJECT: DNROOI~ TYPE WORK: BICYCLE/PED. FACILITY

FUND: REC TRAILS PE: NONE

.

LENGTH (miles r km), 010.00

ROW: NONE

DESCRPT: LUMP SUM DNR RECREATIONAL TRAILS PROGRAM FOR FY 2001

CST: 2001

$950,000

FED Share:

$750,000

OTH Share:

PROJECT: DNR002- TYPE WORK: BICYCLE/PED. FACILITY

FUND: REC TRAILS PE:NONE

LENGTH (miles I km) 010.00

ROW: NONE

DESCRPT: LUMP SUM DNR RECREATIONAL TRAILS PROGRAM FOR FY 2002

CST: 2002

FED Share:

$200,000
$1,250,000 $1,000,000

OTH Share:

PROJECT: DNR003 TYPE WORK: BICYCLE/PED. FACILITY

FUND: REC TRAILS PE: NONE

LENGTH (mileslkm) 0/0:00

ROW: NONE

DESCRPT: LUMP SUM DNR RECREATIONAL TRAILS PROGRAM FOR FY 2003

CST: 2003

FED Share:

$250,000
$.1,250,000 $1,000,000

PROJECT: MOOOOOI TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles I km) 010.00
DESCRPT: CROSS DRAIN PIPE REPLACEM.ENTS IN D1ST#3 @ VARIOUS LOCATIONS . LUMP SUM PROJECT

OTH Share:
PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:

$250,000
UNDERWAY
$1,000,000 $800,000 $200,000

PROJECT: MOOOl78 TYPE W.ORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles I km) 0 10.00
DESCRPT: FORCE ACCOUNT MAINTENANCE ACTYITIES FOR FY 2001

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$15,000,000 $12,000,000
$3,000,000

PROJECT: MOOOl79 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (mileslkm) 010.00
DESCRPT: FORCE ACCOUNT MAINTENANCE ACTVITIES FOR FY 2002

PE:NONE. ROW: NONE CST: 2002 FED Share: GA Share:

$15,000,000 $12,060,000
$3,000,000

PROJECT: MOOOl80 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles I km) 0 10.00
DESCRPT: FORCE ACCOUNT MAINTENANCE ACTVITIES FOR FY 2003

.. '

((:

.~

.

~..:.:.>

PROJECT: M00033I TYPE WORK: BRIDGES

ATLANTA TMA TIP# .

LENGTH (miles I km)

DESCRPT: BRIDGE JACKING IN SEVERAL LOC IN D1ST 7

LUMP SUM PROJECT

FUND:,NHS 0/0.00

PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:
PE: 2001 ROW: NONE CST: NONE

$15,000,000 $12,000,000
$3,000,000
$5,000

Page 16 0/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _ _ _ _ _.._ _

9/21/00

_ _.. ._~.,. ~....._ _ ~ ...

BCli _.....,..

. _ .a_ _

ALL COUNTY
PROJECT: M000460 TYPE WORK: PRELIMINARY ENGINEERING LENGTH (miles / km)
DESCRPT: LICENSE AND SUPPORT AGR,EEMENT FOR HMMS LUMP SUM PROJECT

FUND:STP 0/0.00

PE: 2001 ROW: NONE CST: NONE

$85,000

PROJECT: M000501 TYPE WORK: PRELIMINARY ENGINEERING

ATLANTA TMA TIP #

LENGTH (miles / km)

DESCRPT: DRAINAGE IMPROVEMENTS IN DISTRICT 7/PE ONL Y

LUMP SUM PROJECT

FUND:STP 0/0.00

PE: 2001 ROW: NONE CST: NONE

$10,000

PROJECT: NPSEOI- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 2001

FUND: PARK 0/0.00

PE:NONE ROW: NONE CST: 2001 FED Share:

$33,000 $33,000

PROJECT: NPSE02- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 2002

FUND: PARK 0/0.00

PE:NONE ROW: NONE CST: 2002 FED Share:

$40,000 $40,000

PROJECT: NPSE03- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 2003

FUND: PARK 0/0.00

PE:NONE ROW: NONE CST: 2003 FED Share:

$40,000 $40,000

PROJECT: NPSSOI- TYPE WORK: SIGNING LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 2001

FUND: PARK 0/0.00

PE:NONE ROW: NONE CST: 2001 FED Share:

$44,000 $44,000

PROJECT: NPSS02- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 2002

FUND: PARK 0/0.00

PE:NONE ROW: NONE CST: 2002 FED Share:

$40,000 $40,000

;<
(:~..~..
b~/

PROJECT: NPSS03- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 200.1

FUND: PARK 0/0.00

PE:NONE ROW: NONE CST: 2003 FED Share:

$40,000 $40,000

Page 17 of336

----~--------------,------~------------~------

STATE TRANSPORTATION IMPROVEMENTPROGRAM

..

...""..." 9/21/00

_ _

.._,,._'.l'.I._. .

_

ALL COUNTY

PROJECT: Q24S01- TYPE WORK: SIGNALS

FUND: STP

PE.NONE.

LENGTH (miles/km) 0/0.00

ROW: NONE

DESCRPT: LUMP SUM SIGNAL INSTALLA TION;UPGRADES & MAINTENANCE ANY AREA

CST: 200 I

FED Share:

GA Share:

$9,575,000 $7,660,000 $1,915,000

PROJECT: Q24S02- TYPE WORK: SIGNALS

FUND: STP

PE: NONE

LENGTH (miles/km) 0/0.00

ROW: NONE

DESCRPT: LUMP SUM SIGNAL INSTALLATION;UPGRADES & MAINTENANCE ANY AREA CST: 2002

FED Share:

GA Share:

$10,500,000 $8,400,000 $2,100,000

PROJECT: Q24S03- TYPE WORK: SIGNALS

FUND: STP

PE: NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: LUMP SUM SIGNAL INSTALLATION;UPGRADES & MAINTENANCE ANY AREA

CST: 2003

FED Share:

GA Share:

$10,500,000 $8,400,000 $2,100,000

PROJECT: Q76001- TYPE WORK: PRELIMINARY ENGINEERING

. FUND: MIN. GUARAN PE: 2001

I' LENGTH(miles/km) 0/0.00

ROW: NONE

DESCRPT: LUMP SUM FEDERAL PE FOR CONSULTANT SERVICES FOR FY 2001

CST: NONE

$5,000,000

PROJECT: Q76002- TfPE WORK: PRELIMINARY ENGINEERING

FUND: MIN. GUARAN PE: 2002

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: LUMP SUM FEDERAL PE FOR CONSULTANT SERVICES FOR FY 2002

CST: NONE

$9,999,000

PROJECT: Q76003- TYPE WORK: PRELIMINARY ENGINEERING

FUND: MIN. GUARAN PE: 2003

.

LENGTH (miles/km) 0/0.00"

. - ROW:NONE

DESCRPT: LUMP SUM FEDERAL PE FOR CONSULTANT SERVICES FOR FY 2003

CST: NONE

$9,999,000

PROJECT: T000041 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: DISTRICT I RURAL CAPITAL PROGRAM

F. <.
lcd'

PROJECT: T000042 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: DISTRICT 2 RURAL CAPITAL PROGRAM

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

$75,000 $67,000
$8,000 $8,000
$3 i 0,000
$276,000 $34,000 $34,000

Page J8 of336

____._-,_.---- STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

--,--_.----------,--------------_._._-'-------~-.

.

ALL COUNTY
PROJECT: T000043 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: DISTRICT 3 RURAL CAPITAL PROGRAM

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

$155,000 $138,000
$17,000 $17,000

PROJECT: T000044 TYPE WORK: CAPITAL LENG,TH (miles / km)
DESCRPT: DISTRICT 4 RURAL CAPITAL PROGRAM .

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

$298,000 $265,000
$33,000 $33,000

PROJECT: T000045 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: DISTRICT 5 RURAL CAPITAL PROGRAM

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

$214,000 $190,000
$24,000 $24,000

PROJECT: T000046 TYPE WORK: CAPITAL LENGTH (Miles/ km)
DESCRPT: DISTRICT 6 RURAL CAPITAL PROGRAM

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTHShare:

$318,000 $283,000 $35,000 $35,000

PROJECT: T000047 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: DISTRICT 7 RURAL OPERATING PROGRAM

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

$1,000 $1,000

PROJECT: T000048 TYPE WORK: CAPITAL LENGTH(miles / km)
DESCRPT: STATEWIDE RURAL CAPITAL SUPPLEMENT

PROJECT: T000049 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: INTERCITY BUS CAPITAL PROGRAM

{'
L.:5~~

PROJECT: T000050 TYPE WORK: OPERATING LENGTH (miles / km)
DESCRPT: DISTRICT I RURAL OPERATING PROGRAM

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

OTH Share:

$270,000 $240,000
$30,000 $30,000
$1,411,000 $1,254,000
$157,000 $157,000
$482,000 $241,000
$241,000

Page 19 of336

~-----------------------------------------~------- -

~;>-"_~

'STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _ '~

""'o;_,_""~_~

""...""""","",,,,

9/21/00

>_~''''_''''''

~''''"'.

tQ:_'''''_'''... .._ . ,,.:~:,..,t,

""""_..._ _

_

~_,

ALL COUNTY
PROJECT: T00005] TYPE WORK: OPERATING LENGTH (miles / km)
DESCRPT: DISTRICT 2 RURAL OPERATING PROGRAM

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

. $1,188,000 $594,000

PROJECT: T000052 TYPE WORK: OPERATING

.

LENGTH (miles / km)

DESCRPT: DISTRICT 3 RURAL OPERATING PROGRAM

OTHShare:

FUND: TRANsiT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

$594,000
$1,040,000 $520,000

PROJECT: T000053 TYPE WORK: OPERATING

,

LENGTH (miles / km)

DESCRPT: DISTRICT 4 RURAL OPERATING PROGRAM

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

$520,000
$226,000 $113,000

OTH Share:

$113,000

PROJECT: T000054 TYPE WORK: OPERATING LENGTH (miles / km)
DESCRPT: DISTRICT 5 RURAL OPERATING PROGRAM

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

OTHShare:

$272,000 $136,000
~
$136,000

. PROJECT: T000055 TYPE WORK: OPERATING

.

FUND: TRANSIT

PE: NONE

",

" .

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: DISTRICT 6 RURAL OPERATING PROGRAM

CST: 2003

$1,114,000

FED Share:

$557,000

PROJECT: T000056 TYPE WORK: OPERATING . LENGTH (miles / k;")
DESCRPT: DISTRICT 7 RURAL OPERATING PROGRAM

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

$557,000
$2,000 $1,000

OTH Share:

PROJECT: T000057 TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 0 /0.00

ROW: NONE

DESCRPT: STATEWIDE SUPPLEMENTAL FOR RURAL OPERATING PROGRAM

CST: 2003

FED Share:

$1,000
$600,000 $300,000

it' '-~
L~>

PROJECT: T000061 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 5310 FOR D.H.R. DISTRICT I

.OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

. ROW: NONE

CST: 2001

FED Share:

GA Share:

$300,000
$118,000 $118,000
$30,000

Page 20 'of336

_w_ ;,

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Ql._.._ '_ _~~

9/21/00

.'..

..

ALL COUNTY
PROJECT: T000062 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 53 I0 FOR O.H.R. DISTRICT I

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

PROJECT: T000063 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 53 I0 FOR O.H.R. DISTRICT I

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

PROJECT: T000064 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 53 10 FOR O.H.R. DISTRICT 2

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

PROJECT: T000065 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY2002 SECTION 5310 FOR O.H.R. DISTRICT 2

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

PROJECT: T000066 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 53 I0 FOR O.H.R. DISTRICT 2

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

PROJECT: T000067 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 SECTION 5310 FOR O.H.R. DISTRICT 4

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

PROJECT: T000068 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR O.H.R. DISTRICT 4

FUND: TRANSIT

PE:.NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

PROJECT: T000069 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR O.H.R. DISTRICT 4

FUND: TRANSIT

PE:NONE.

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

.._
$124,000 $124,000
$31,000
$130,000 $130,000
$33,000
$85,000 $85,000 $21,000
$90,000 $90,000 $22,000
$94,000 $94,000 $24,000
$87,000 $87,000 $22,000
$91,000 $91,000 $23,000
$96,000 $96,000 $24,000

Page 21 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

_ _ _ _ _ _ _ :o\. _ _ .,.

_ _._ """~"" _......_ .

.,, _ _. . _ _



ALL COUNTY
PROJECT:. T000070 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 SECTION 5310 FOR DRR. DISTRICT 5

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

PROJECT: T000071 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR DRR. DISTRICT 5

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

.CST: 2002

FED Share:

G~ Share:

PROJECT: Toooon TYPE WORK: CAPITAL
. LENGTH (miles / km) DESCRPT: FY 2003 SECTION 5310 FOR O.H.R. DISTRICT 5

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

PROJECT: T000073 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 SECTION 5310 FOR O.H.R. DISTRICT 6

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

\..;:.;. "
PROJECT: T000074 TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: FY 2002 SECTION 5310 FOR ORR. DISTRICT 6

CST: 2002

FED Share:

GA Share:

PROJECT: T000075 TYPE WORK: CAPITAL

.

LENGTH (miles / km)

DESCRPT: FY 2003 SECTION 5310 FOR ORR. DISTRICT 6

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

PROJECT: T000076 TYPE WORK: CAPITAL . LENGTH (miles / km)
DESCRPT: FY 2001 SECTION 5310 FOR ORR. DISTRICT 7

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

' r ''\0
!~ .~:
~

PROJECT: roooo TYPE WORK: CAPITAL
LENGTH (miles / km) DESCRPT: FY 2002 SECTION 5310 FOR ORR. DISTRICT 7

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:'

_
$61,000 $61,000 $15,000
$64,000 $64,000 $16,000
$67,000 $67,000 $17,000
$41,000 $41,000 $10,000
$43,000 $43,000 $11,000
$45,000 $45,000 $11,000
$36,000 $36,000 $9,000
$38,000 $38,000
$9,000

Page 22 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
-----,~--------- --_._--,--, 9/21/00 -----------------------

ALL COUNTY
PROJECT: T000078 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR O.H.R. DISTRICT 7

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$40,000 $40,000 $10,000

PROJECT: T000079 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 SECTION 5310 FOR D.H.R. DISTRICT 8

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$59,000 $59,000 $15,000

PROJECT: T000080 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR O.H.R. DISTRICT 8

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GAShare:

$62,000 $62,000 $16,000

PROJECT: T000081 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR O.H.R. DISTRICT 8

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$65,000 $65,000 $16,000

PROJECT: T000082 TYPE WORK: CAPITAL

I.

LENGTH (miles / km)

DESCRPT: FY 200 I SECTION 5310 FOR O.H.R. DISTRICT 9

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Shure:

$61,000 $61,000 $15,000

PROJECT: T000083 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR O.H.R. DISTRICT 9

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$64,000 $64,000 $16,000

PROJECT: T000084 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR O.H.R. DISTRICT 9

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$67,000 $67,000 $17,000

:. .
Lj~:

PROJECT: T000085 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 5310 FOR O.H.R. DISTRICT 10

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001
rso sss-

GA Shure:

$64,000 $64,000 $16,000

Page 23 of336

---------------------------------------,---------
STATE TRANSPORTATIONIMPROVEMENT PROGRAM
9/21/00

ALL COUNTY
PROJECT: T000086 TYPE WORK: CAPITAL , LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR DHK DISTRICT 10

FUND: TRANSIT

PE: NONE

0/0,00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$67,000 $67,000 $17,000

PROJECT: T000087 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR DHR. DISTRICT 10

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$71,000 $71,000 $18,000

PROJECT: T000088 TYPE WORK: CAPITAL, , LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 5310 FOR DHR. DISTRICT 11

FUND: TRANSIT

PE: NONE

0/0,00

ROW: NONE

CST: 2001

FEDShllre:

GA Share:

$21,000 $21,000 $5,000

PROJECT: T000089 TYPE WORK: CAPITAL

FUND: TRANSIT

PE: NONE

,

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: FY 2002 SECTION 5310 FOR DHR, DISTRICT I I

CST: 2002,

FEDShllre:

GA Share:
.;.

PROJECT: T000090 TYPE WORK: CAPITAL . LENGTH (miles / km)
, DESCRPT: FY 2003 SECTION 53 I0 FOR DHR. DISTRICT 11

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$22,000

$22,000

$6,000

e

'"
$24,000 $24,000 $6,000

PROJECT: T000091 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 5310 FOR DHR. DISTRICT 12

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$276,000 $276,000
$69,000

PROJECT: T000092 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR DHR. DISTRICT 12

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FEDShllre:

GA Share:

$289,000 $289,000 $72,000

PROJECT: T000093 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR DHR. DISTRICT 12

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FEDShllre:

GA Shure:

$304,000 $304,000
$76,000

Page 24 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
-------------------, 9121100 ------- ,----.-----

APPLING COUNTY
PROJECT: 00001/9 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: BAXLEY STREETSCAPE AND WELCOME CENTER

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$700,000 $560,000

OTH Share:

PROJECT: 0001216 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 1.79/2.88

DESCRPT: SR 4fUS I @ ALTAMAHA RIVER; OVERFLOW AND WILLIAMS CKrrOOMBS

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2002 ROW: CST:

$140,000
$100,000 AFTER 2003 AFTER 2003

PROJECT: 0001218 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 1.2/1.93

DESCRPT: SR 4fUS I @BLACK WATER & SWEET WATER CREEKS 2 MI S OF BAXLEY

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2002 ROW: CST:

$240,000 AFTER 2003 AFTER 2003

PROJECT: 522580- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 8/12.88

DESCRPT: SR 27fUS 341 FM CL OF SURRENCY TO W CL OF ODUMf WAYNE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 52258X- 523265-

PROJECT: 522590- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 27IUS 341 FM 4-LN IN BAXLEY TO W CL OF SURRENCY EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STATE 10 / 16. /0

PE: 1994 ROW: 2002 CST:

UNDERWAY $922,000
AFTER 2003

PE: 1994 ROW: 2001 CST:

UNDERWAY $323,000
AFTER 2003

PROJECT: 532460- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / ~m) 2.86/4.60

DESCRPT: SR 15 FM CR 53 liMP 16.73 TO CR202f4I7IMP 19.59 S OF BAXLEY

EXIST. LANES: 02 PROPOSED LANES: 05

PE: 2001 ROW: 2002 CST:

$198,000 $180,000 AFTER 2003

PROJECT: 533165- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2001

LENGTH (miles / km) 0.24/0.39

ROW: 2001

DESCRPT: SR 15 @ BIG SATILLA CREEK OfF .21 MI N OF PIERCE CO LN

CST: 2003

FED Share:

GA Share:

~t::

PROJECT: 53317X- TYPE WORK:' REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km}

0/0.00

DESCRPT: SR 15 @BIG SATILLA CREEK AT APPLING CO LNISEE PIERCE 533170

ASSOCIATED PROJECTS: 533170-

PE:NONE ROW: NONE CST: NONE

$20,000 $/0,000 $608,000 $486,400 $121,600

Page 250/336

-----------------,.,-_._--_.._ - - - - - - - - - - - - - - - - - - - -
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

ATKINSON COUNTY

PROJECT: 0000688 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (mileslkm) 0.21/0.34

DESCRPT: SR 135 @ DARK BAY CREEK APP 4 MI N OF WILLACOOCHE

PE: 2001 ROW: 2002 CST:

, $20,000 $10,000
AFTER 2003

PROJECT: 432105- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.26/0.42

ROW: 2001

DESCRPT: SR 135 @ALAPAHA RIVER OVERFLOW APP 3 MLS OF JCT SR 520

, CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$1,283,000 $1,026,400
$256,600

PROJECT: 432106- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.26 /0.42
DESCRPT: SR 135 @ALAPAHA RIVER OVERFLOW APP 2 MI SOF JCT SR 520 & Y

ROW: 2001 CST: 2002

FED Share:

ASSOCIATED PROJECTS: 43Y106-

GA Share:

UNDERWAY $10,000 $783,000 $626,400
$156,600

,PROJECT: 432107- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

UNDERWAY

LENGTH (miles / km) 0.21 10.34

ROW: 2001

$10,000

DESCRPT: SR 135 @ PUDDING CREEK APP 1.5 MI N JCT SR 520

CST: 2002

$723,000

FED Share:

$578,400

GA Share:

$144,600

;:"

"

PROJECT: 4321 IX- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles 1 km) 010.00

DESCRPT: SR 135 @ALAPAHA RIVER @ ATKINSON CO LINEISEE BERRIEN 432110

PE:NONE ROW: NONE CST: NONE

ASSOCIATED PROJECTS: 432110-

PROJECT: 43YIQ6- TYPE WORK: REPLACE BRIDGE

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: SR 135 @ALAPAHA RIVER OVERFLOW - FOR STP $1 SEE 432106-

ASSOCIATED PROJECTS: 432106-

PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:

UNDERWAY
$500,000 $40.0,000 $100,000

~, : ~;:

,'
Page 26 of336

----------....,------.--_.-_._ _ ... - - - - - - - - -

-_ ._------- -_ .. __ _-~._.

STATE TRANSPORTATION IMPROVEMENT PROGRAM
,-------_._-- 9/21/00-------_._-----"... ....

BACON COUNTY
PROJECT: 0001155 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles/km)
DESCRPT: SR 32 AT SR 4 ALT IN ALMA LUMP SUM PROJECT

FUND: STP 0.1/0.16

PE: 2001 ROW: 2002 CST: 2003 FEDSilare: GA Share:

$5,000 $10,000 $83,000 $74,700 $8,300

. ~:-
,=.
ba::'
Page 27 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
_.. ----_._._-_._._---_. _?/.2_1/0-0,,-----------_._-- -------

BAKER COUNTY

PROJECT: 431710- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.8/1.29 DESCRPT: SR 91/PETER ZACKGEER HWY@ICHAWAYNOCHAWAYCKNOFSR253

PE: 1997 ROW: 2001 CST:

UNDERWAY $35,000
AFTER 2003

PROJECT: 442850- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.18 /0.29

ROW: LOCL

DESCRPT: CR 124/FAS 1630 @BIG CYPRESS CREEK APP 12 MI SW OF NEWTON

CST: 2001

FED Share:

GA Share:

UNDERWAY
$388,000 $310,400
$77,600

PROJECT: 442860- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.12 /0.19

ROW: LOCL

DESCRPT: CR 67/JONES ROAD @ MILL CREEK APP 16 MI NW OF NEWTON

CST: 2002

FED Share:

GA Share:

UNDERWAY
$388,000 $310,400
$77,600

PROJECT: 471420- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1998

LENGTH (miles / km) 0.12/0.19

ROW: LOCL

DESCRPT: CR l2l/CLEAR LAKE ROAD@CHICKASAWHATCHEECREEKEOFSR37

CST: 2001

FED Share:

GA Share:

UNDERWAY
$1,200,000 $960,000 $240,000

f'
t;:i:'
Page 28 0/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

BALDWIN COUNTY

PROJECT: 0000148 TYPE WORK: HISTORIC PRESERVATION

FUND: STP

LENGTH (mileslkm) 010.00

DESCRPT: MILLEDGEVILLE RR DEPOT RESTORATION & LANDSCAPING

PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 0000346 TYPE WORK: NEW CONSTRUCTION

FUND: STATE

LENGTH (miles I km) 8.8 I 14.17

DESCRPT: FALL LINE FWY ON NEW LOC FM US 441IWILKINSON CO TO SR 24

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 2001 CST:

$1,000,000 $800,000
$200,000
UNDERWAY $1,800,000 AFTER 2003

PROJECT: 222280- TYPE WORK: WIDENING

FUND: HPP

LENGTH (miles I km) 7.5 112.08

DESCRPT: SR 24/SR 540 FM SOUTH OF CR 186 TO CR lOIN WASHINGTON CO

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIA TED PROJECTS: 22228X-

PE: 1993 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $2,001,000 $18,395,000 $14,716,000 $3,679,000

PROJECT: 231450- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles I km) 2.4 13.86

DESCRPT: SR 49 FM JUST W. OF ALLEN MEMORIAL RD TO MILLEDGEVILLE BYP

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1997 ROW: 2002 CST:

UNDERWAY $105,000
AFTER 2003

PROJECT: 232240- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (mileslkm) 0.45/0.72

DESCRPT: SR 22/SR 24 AT LAKE LAUREL RD/CR 472 EAST OF MILLEDGEVILLE

LUMP SUM PROJECT

PE: 1999 ROW: 2001 CST: 2001 FED Share: GA Share:

UNDERWAY $32,000
$232,000 $208,800
$23,200

PROJECT: 232260- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.2 I 10.34

DESCRPT: SR 22 @ CS 558 TATTN ALL STREET IN WEST MILLEDGEVILLE

PE: 2001 ROW: 2003 CST:

$66,000 $10,000 AFTER 2003

PROJECT: 245405- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

LENGTH (miles I km). 0.24 10.39

DESCRPT: SR 243/US 441 BUS. @ FISHING CREEK SOUTH MILLEDGEVILLE

PE: 2001 ROW: CST:

$131,000 AFTER 2003 AFTER 2003

PROJECT: 26247X- TYPE WORK: NEW CONSTRUCTION

FUND: STATE

LENGTH (miles I km) 0 10.00

DESCRPT: FALL LINE FWY-NEW LOC FM N GORDON BYP TO SR 24/SEE WILKINSON

ASSOCIATED PROJECTS: 262470-

PE:NONE ROW: NONE CST: NONE

Page 29 of336

ST~TE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

BALDWIN COUNTY

PROJECT: 270700- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1998

LENGTH (miles / km) 0.22/0.35

ROW: LOCL

DESCRPT: CR 72/PETTIGREW ROAD @ FISHING CREEK 6.3 MI W OF MILLEDGEVIL

CST: 2002

FED Share:

GA Share;

UNDERWAY
$633,000 $506,400 $126,600

.PROJECT:, 271287- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

I.

LENGTH (miles / km) 0/0.00

DESCRPT: BIKE/PED TRAIL FM MILLEDGEVILLE TO GC&SU CAMPUS & H.S.

PE:LOCL ROW: LOCL CST: 2001 . FED Share:

OTHShare:

$400,000 $320,000
$80,000

,.
Page 30 of336

STATE TRANSPORTA TION IMPROVEMENT PROGRAM

--_ _----_._- ..__ 9/21/00.._,._.

.......

.~_,_.

.*ffl._._. ._._..

..._.._._. _

_._~

BANKS COUNTY

PROJECT: 0000158 TYPE WORK: SIDEWALKS

FUND: STP

LENGTH (miles 1 km) 010.00

DESCRPT: BANKS CROSSING CORRIDOR BEAUTIFICATION & SIDEWALKS

PE:LOCL ROW: LOCL CST: 2001 FED Share:

$600,000 $480,000

PROJECT: 0000470 TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles 1 km) 0.6/0.97

DESCRPT: 1-85 SAFETY UPGRADES @ SR 15; SR 63 AND SR 51/320/FRANKLIN

ASSOCIA TED PROJECTS: 00004XO

OTHSIUlre:
PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:

$120,000 .
UNDERWAY
$13,800,000 $12,420,000
$1,380,000

PROJECT: 142265- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 51 @ GROVE CREEK 7 MI WEST OF HOMER

FUND: BRIDGE

PE: 1999

0.21 10.34

ROW: 2001

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$348,000 $278,400
$69,600

PROJECT: 142266- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (mileslkm) 0.22/0.35

ROW: 2001

DESCRPT: SR 105 @MIDDLE FORK BROAD RIVER 9.6 MI NORTH OF HOMER

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$201,000 $160,800
$40,200

Page 31 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

BARROW COUNTY
PROJECT: 0000950 TYPE WORK: NEW CONSTRUCTION LENGTH (miles I km)
DESCRPT: SR 316 AT SR 81 - LOCAL SERVICE ROAD

FUND: STATE 0.2 10.32

PE: 1996 ROW: NONE CST: 2001

GA Share:

UNDERWAY $350,000 $350,000

PROJECT: 121730- TYPE WORK: NEW CONSTRUCTION

FUND: STP

LENGTH (miles I km) 2.6/4.19

DESCRPT: WINQER EAST BYP/SR 988 FM SR 316 (INCL INTERCHANGE) TO SR 53

EXIST. LANES: 00 PROPOSED LANES: 04

PE: 1998 ROW: 2001 .CST:

UNDERWAY $5,278,000 AFTER 2003

PROJECT: 12R870- TYPE WORK: . INTERCHANGE

FUND: NHS

LENGTH (mileslkm) 010.00

DESCRPT: SR 316 IN BARROW AND OCONEE COS-26 INTCHG FOR ADDL RWII 22870

ASSOCIATED PROJECT.S: 122870~ 122870-

PE: 1996 ROW: 2001 CST: NONE

UNDERWAY $12,500,000

PROJECT: 132570- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (mileslkm) 0.21/0.34

ROW: 2000

DESCRPT: SR 53/GAINESVILLE HWY. @ CEDAR C~EEK 2.7 MI NORTH OF WINDER

CST: 2001

FED Share:

ASSOCIATED PROJECTS: ,132670-

GA Share:

UNDERWAY UNDERWAY
$662,000 $529,600 $132,400

PROJECT: 132670- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles I km) 0.2 10.32

DESCRPT: SR 53 AT ROCKWELL CHURCH RD/CR 4 NORTH OF WINDER

ASSOCIATED PROJECTS: 132570- .

PE: 1996 ROW: 1997 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$315,000 $252,000
$63,000

PROJECT: 132970- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.22/0.35

DESCRPT: SR II/WINDER-MONROE HWY. @ MARBURY CREEK SO OF WINDER

PE: 1999 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 132971- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.22/0.35

DESCRPT: SR II/WINDER-MONROE HWY. @ SCOTT CREEK SOUTH OF BETHLEHEM

PE: 1999 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 142130- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles I km) 0.66/1.06

DESCRPT: SR 211 AT ROCKWELL CHURCH RD/CR 4/CEDAR HILL RD/CR 327

LUMP SUM PROJECT

PE: 1998 ROW: 2001 CST: 2001 FED Share: GA Share:

UNDERWAY $1,000,000 $1,159,000 $1,043,100
$115,900

Page 31 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
-- 9/21/00 -----------------

BARROW COUNTY

PROJECT: 171600- TYPE WORK: RAIL PROJECTS

FUND:NHS

ATHENS TIP #

LENGTH (miles I km) 0 10.00

DESCRPT: COMMUTER RAIL DACULA TO ATHENS/CLARKE - PHASE 4 PROPOSED TCM

PE:NONE ROW: 2002 CST: 2003 FED Share: GA Share:

$5,000,000 $ 15,000,000 $12,000,000
$3,000,000

. ~\
LJ
Page 33 of336

---

STATE TRANSPORTAi70N IMPROVEMENT PROGRAM

$,_.

9/21/00

_

BARTOW COUNTY

PROJECT: 0000291 TYPE WORK: REALIGNMENT

FUND: STP

LENGTH (miles 1 km) 1.16/1.87

DESCRPT: OLD ALA RDISR 113 RELOC FM EAST OF SR 293 @ CSX RR TO 1-75

EXIST, LANES: 00 PROPOSED LANES: 04

'

PE: 1998 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $1,322,000 $7,890,000 $6,312,000 $1,578,000

PROJECT: 0000932 TYPE WORK: INTERCHANGE LENGTH (miles 1 km)
DESCRPT: 1-75 SAFETY UPGRADES @ SR 61

FUND: 1M 0.2/0.32

' PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$2,800,000 $2,520,000
$280,000

PROJECT: 620832- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 61 @ ETOWAH RIVER & APPROACHES EXIST ..LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 621255-

FUND: BRIDGE

PE: 1994

0.63/1.01

ROW: 1987

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY
$4,262,000 $3,409,600
$852,400

PROJECT: 621130- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1988

LENGTH (miles 1 km) 0.3/0.48

ROW: 2001

DESCRPT: SR 113 BRIDGE & APPROACHES OVER HILLS CREEK

CST: 2002

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

GA Share:
.<

:~-.. .
PROJECT: 621250- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles 1 km) 2.4 13.86

DESCRPT: SR 61/CARTERSVILLE FM GILMER ST TO SR 20/lNCL I-WAY PAIR

EXIST. LANES: 03 PROPOSED LANES: 05

PE: 1992 ROW: 2002 CST:

UNDERWAY $50,000
$462,000 $369,600
$92,400
UNDERWAY $1,198,000 AFTER 2003

PROJECT: 621255- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles 1 km) 2.61 14.20

DESCRPT: SR 61/SR I 13 FM CR 533 NO TO PLYMOUTH DRiCARTERSVILLEIEXC BR

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 620832-

PE: 1992 ROW: 1997 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$4,144,000 $3,315,200
$828,800

PROJECT: 621350- TYPE WORK: WIDENING

,

LENGTH (miles 1 km)

DESCRPT: SR 20 FM SR 61 TO 1-75 (INCL INTCH WISR 61 & US 41)

EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 2.47/3.98

PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Shure:

UNDERWAY $3,456,000
$13,751,000 $11,000,800
$2,750,200

f'
t~~~~;

PROJECT: 621410- TYPE WORK: REALIGNMENT

FUND: STP

LENGTH (miles 1 km) 5.35 18.61

DESCRPT: OLD ALA RDISR 113 RELOC FM SR 113--PUMPKINVINE CK-TO CR 699

PE: 1998 ROW: 2001 CST:

UNDERWAY $3,360,000 AFTER 2003

Page 34 of336

""' .. - _

_,

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

lll

_ _... _ ,... _ " '...

_ __..__

....-~~~ _~

_

I''J

.... _ ' = .. ....

_~

"'..

BARTOW COUNTY

PROJECT: 621415- TYPE WORK: REALIGNMENT

FUND: STP

LENGTH (miles / km) 1.97/3.17

DESCRPT: OLD ALA RDISR 113 RELOC FM CR 699 TO EAST OF SR 293 @CSX RR

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1998 ROW: 2001 CST: 2003 FED Share: GA Share:

_
UNDERWAY $2,078,000 $9,034,000 $7,227,200 $1,806,800

PROJECT: 621430- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 4.7/7.57

DESCRPT: SR 113 FMSITAYLORSVILLE CL NE TO CR 31ISTILESBORO/POLK

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 62143X- 621435-

PE: 1993 ROW: 2001 CST:

UNDERWAY $2,345,000 AFTER 2003

PROJECT: 621435- TYPE WORK: BRIDGE REHAB LENGTH (miles / km)
DESCRPT: SR 113 @DRY CREEK EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 621430-

FUND: BRIDGE

PE: 1993

0.16/0.26

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY $50,000
$221,000 $176,800
$44,200

PROJECT: 621440- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 113 FM CR 311STILESBORO NE TO SR 61 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 621760-

FUND: STP 4.3 /6.92

PE: 1998 ROW: 2002 CST:

UNDERWAY $2,855,000 AFTER 2003

PROJECT: 621710- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 4.15 /6.68

DESCRPT: SR 20 EB & WB MP 17.8-19.3; EB 19.3-20.75; WB MP 20.75-21.95

EXIST. LANES: 02 PROPOSED LANES: 03

ASSOCIATED PROJECTS: 631510-

PE: 1998 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $2,213,000 $4,876,000 $3,900,800 $975,200

PROJECT: 621760- TYPE WORK: REPLACE BRIDGE

.

LENGTH (miles / km)

DESCRPT: STATE ROUTE 113 @RICHLAND CREEK

FUND: BRIDGE
0.2/0.32

PE: 1993 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 622150- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR 61 AT OLD ALABAMA RD/CARNES RD/CR 636 LUMP SUM PROJECT

FUND: STP
0.22/0.35

PE: 1999 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $23,000
$692,000 $622,800
$69,200


c'. :'
t~sF

PROJECT: 62Y135- TYPE WORK: TURN LANES

FUND: NHS

LENGTH (miles / km) 4.1 /6.60
s DESCRPT: SR 20 FM SR I IN FLOYD TO SR 3 FOR RURAL SEE 622135

ASSOCIATED PROJECTS: 622135-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$5,862,000 $4,689,600 $1,172,400

Page 35 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
---~,~,._-----------------------------_._._--~_._------

BARTOW COUNTY
PROJECT: 631510- TYPE WORK: BRIDGE REHAB LENGTH (miles 1 km)
DESCRPT: SR 20 AT STAMP CREEK 5.8 MI SE OF WHITE
ASSOCIATED PROJECTS:- 621710-

, FUND: BRIDGE

PE: 1996

0.22/0.35

ROW: 2002

CST: 2003

FED Share:

GA Share:

, UNDERWAY $34,000
.. $907,000 $725,600 $181,400

PROJECT: 631515~ TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

LENGTH (miles 1 km)' 0.22/0.35

DESCRPT: SR 20 @ BOSTON CREEK 6.2 MILES SE OF WHITE .

ASSOCIATED PROJECTS: 621710-

PE: 1996 ROW: 2002 CST:

UNDERWAY $24,000
AFTER 2003

PROJECT: 632925- TYPE WORK: BRIDGES

FUND: STP

LENGTH (miles 1 km) . 010.00

DESCRPT: DECK HYDRODEMOLITION ON 2 BRIDGES IN BARTOW COUNTY

LUMP SUM PROJECT

PE:NONE ROW: NONE CST: 2001 ' FED Share: GA Share:

$38,000 $30,400
$7,600

PROJECT: 642035- TYPE WORK: PASSING LANES

FUND: STP'

LENGTH (miles 1 km) 2.8 14.51

. '"DESCRPT: SR 140 EB MP 19.05-20.0;WB MP 20.00-20.95;EB MP 20.95-21.90

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 2000 ROW: 2002 CST:

UNDERWAY $137,000
AFJER2003

PROJECT: 642100- TYPE WORK: BRIDGE REHAB

FUND: STP

LENGTH (mileslkm) 0.45'/0.72

DESCRPT: CSX RAILROAD UNDERPASS RELOC AT SR 293 NORTH OF CARTERSVILLE, !

. PE: 2000 ROW: 2002 CST: ,

UNDERWAY $847,000
AFTER 2003

PROJECT: 662205- TYPE WORK: NEW CONSTRUCTION LENGTH (miles 1 km)
DESCRPT: OUTER PERIMETER FM CR 623 EAST TO SR 3/US 4 I EXIST. LANES: 00 PROPOSED LANES: 04

FUND: STATE 6.7/10.79

PE: 2003 ROW: CST:

. $228,000 AFTER 2003 AFTER 2003

PROJECT: 671204- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: MULTI-USE TRAIL IN EUHARLEE

FUND:STP 0/0.00

PE:LOCL ROW: LOCL CST: 200) FED Share:

OTHShare:

PROJECT: 671225- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.27 /0.43

ROW: LOCL

DESCRPT: CR 851/HARDIN BRIDGE ROAD @ ETOWAH RIVER NORTH OF EUHARLEE

CST: 2003

FED Share:

OTH Share:

$100,000 $80,000
$20,000 UNDERWAY
$I,~OO,OOO
$1,200,000
$300,000

Page 36 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

BEN HILL COUNTY

PROJECT: 0000120 TYPE WORK: B1CYCLEIPED. FACILITY

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: FITZGERALD DOWNTOWN REVITALIZATION & STREETSCAPE

PE:LOCL ROW: LOCL
CST: 2001 FED Share:

PROJECT: 471440- TYPE WORK: BICYCLEIPED. FACILITY LENGTH (miles / km)
DESCRPT: STREETSCAPES IN THE CITY OF FITZGERALD

FUND:STP 0/0.00

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

$875,000 $700,000 $175,000
$625,000 $500,000 $125.000

Page 37 of336

------------------------,--._------------
STATE TRANSPORTATION IMPROVEMENTPROGRAM
,9/21/00
. _ - , - - - - _... - _.....> " - ' -......._ ............- - - " ' , " " , - - - - - - - - - " - - - _ . _ - - , - -..._ - - - - - -

BERRIEN COUNTY
PROJECT: 0000121 TYPE WORK: BlCYCLE/PED. FACILITY , LENGTH (miles / km)
DESCRPT: ALAPAHA WALKING TRAIL

FUND:STP 0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

~

$16,000

$13,000

~"

PROJECT: 0000208 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR 761ADEL ROAD AT DOGWOOD DRIVEICR 356 LUMP SUM PROJECT

FUND: STP 0.25 /0.40

OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

$3,000
UNDERWAY
$318,000 $286,200
$31,800

PROJECT: 432110- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 135 @ALAPAHA RIVER@ATKINSON CO LINE
ASSOCIATED PROJECTS: 4321 IX-

FUND: BRIDGE

PE: 1999

0.41 /0.66

ROW: 2002

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$2,846,000 $2,276,800
$569,200

PROJECT: 432 I I 1- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.23/0.37

DESCRPT: SR 125 @ NEW RIVER NEAR BERRIEN-TIFT CO LINE

ASSOCIATED PROJECTS: 43211 Z-

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 442920- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.23/0.37

ROW: 2001

DESCRPT: SR 64/SR 84/SR 168 @ ALAPAHA RIVER OVERFLOW NEAR ATKINSON CO.

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$468,000 $374,400 $93,600

PROJECT: 442925- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles/km) 0.23/0.37

ROW: 2001

DESCRPT: SR 168@TEN MILE CREEK APP 4.5 MI EAST OF JCT SR II

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000 $593,000
$474,400 $118,600

PROJECT: 442930- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.22/0.35

ROW: 2001

DESCRPT: SR 168 @ FIVE MILE CREEK APP 2.8 MI WEST OF JCT SR 135

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$539,000 $431,200 $107,800

PROJECT: 442931- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.24 /0.39

ROW: 2003

DESCRPT: SR 37 @ CAT CREEK IN RAY CITY
f:

CST:

~..:;;

UNDERWAY $10,000
AFTER 2003

Page 38 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

--------------------

9/21/00
------

0

' . , - - - -

._.,._._.

_

BIBB COUNTY

PROJECT: 0000122 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

MACON TIP # MCN-n

LENGTH (miles I km) 0.5 10.81

DESCRPT: SEC 102/103 OF OCMULGEE HERITAGE GREENWAY TRAIL/LANDSCAPING

PE:LOCL ROW: LOCL CST: 2001 FED Share:

$1,000,000 $800,000

OTH Share:

PROJECT: 0000566 TYPE WORK: WIDENING

FUND: STP

MACON TIP # MCN-39

LENGTH (miles I km) 5.45 18.77

DESCRPT: SARDIS CHURCH RD/CR 717 FROM 1-75 TO SR 247IHA WKINSVILLE RD

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2001 ROW: 2002 CST: 2003 FED Share: GA Share:

$200,000
$5,000 $2,132,000 $14,000,000 $11,200,000 $2,800,000

PROJECT: 0000835 TYPE WORK: BRIDGE REHAB

FUND: STP

MACON TIP # MCN-28

LENGTH (miles I km) 0.2 10.32

DESCRPT: JEFFERSONVILLE RD AT NORFOLK' SOUTHERN RAILROAD

EXIST. LANES: 02 PROPOSED LANES; 05

ASSOCIATED PROJECTS; 351080-

PE: 1996 ROW: NONE CST: 2003 FED Share: GA Share:

UNDERWAY
$4,839,000 $3,871,200
$967,800

PROJECT: 0000954 TYPE WORK: LIGHTING

FUND: OTHER

MACON TIP #

LENGTH (miles I km) 0/0.00

DESCRPT: 1-16 FM EAST OF CENTRAL OF GA RR TO SR 87/US 129 IN MACON

LUMP SUM PROJECT

PE: 2001 ROW: NONE CST: 2001
GA Share:

$125,000 $1,500,000 $1,500,000

PROJECT: 000 I017 TYPE WORK: BICYCLEIPED. FACILITY

FUND: REC TRAILS PE: NONE

MACON TIP # DNR-3

LENGTH (miles I km) 0.5 10.8 I

ROW: NONE

DESCRPT: DNR REC TRAILS - OCMULGEE GREENWAY TRAIL FM 2ND TO GATEWAY

CST: 200 I

FED Share:

OTHShare:

PROJECT: 0001078 TYPE WORK: BICYCLE/PED. FACILITY

FUND: REC TRAILS PE: NONE

MACON TIP # DNR-4

LENGTH (miles I km) 0.4 10.64

ROW: NONE

DESCRPT: DNR REC TRAILS - OCMULGEE GREENWAY TRAIL FM SPRING TO 2ND

CST: 200 I

FED Share:

PROJECT: 310980- TYPE WORK: INTERCHANGE

FUND: NHS

MACON TIP # MCN- I I

LENGTH (miles I km) 0.97 I 1.56

DESCRPT: 1-16 @SR540INCL 1-16 ML BR @SAL RRjl STREAM & 1 RIVER

OTHShare:
PE: 1986 ROW: 2001 CST:

$125,000 $100,000
$25,000
$125,000 $\00,000
$25,000 UNDERWAY
$500,000 AFTER 2003

y:{. -. t~J:'

PROJECT: 3 I 1000- TYPE WORK: WIDENING

FUND: NHS

MACON TIP # MCN-IO

LENGTH (miles I km) 1.86/2.99

DESCRPT: 1-16/MACON FM SR II EAST TO SR 87 INCLBRIDGES & CD IEXC MLK

EXIST. LANES; 04 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 311400-

PE: 1986 ROW: 2002 CST:

UNDERWAY $7,000,000 AFTER 2003

Page 39 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

BIBB COUNTY

PROJECT: 311005- TYPE WORK: BRIDGE REHAB

FUND: NHS

MACON TIP # MCN-66 '

' LENGTH (miles / km) 0,25 /0.40

DESCRPT: 1-16 IN MACON- BRIDGE AT MARTIN LUTHER KING DRIVE

EXIST. LANES: 04 PROPOSr:D LANES: 06

PE: 1986 ROW: NONE CST: 2003 FED Share: GA Share:

UNDERWAY
$10,000,000 $8,000,000 $2,000,000

PROJECT: 311400- TYPE WORK: WIDENING

MACON TIP # MCN-13

LENGTH (miles / km)

DESCRPT: 1-75/MACON FROM PIERCE AVE/CR 478 EAST TO 1-16

EXIST. LANES: 04 PR0I.'OSED LANES: 06

ASSOCIATED PROJECTS: 311000-

FUND: NHS 1,62 /2,61

PE: 1992 ROW: 2003 CST:

UNDERWAY $10,000,000 AFTER 2003

PROJECT: 311460- TYPE WORK: BRIDGI;: REHAB

FUND: 1M

MACON TIP # MCN-I A

LENGTH (miles / km) 0.45 /0,72

DESCRPT: RECONSTRUCT HARTLEY BRIDGE RD/CR 740 BRIDGE & APP OVER 1-75

EXIST. LANES: 02 PROPOSED LANES: 05

PE: 1992 ROW: 2001 CST: 2001 , FED Share: GA Share:

UNDERWAY $5,247,000 $4,875,000 $4,387,500 $487,500

PROJECT: 3 11465- TYPE WORK: INTERCHANGE

MACON TIP # MCN-IB

,LENGTH (miles / km)

DESCRPT: 1-75!1-475 INTERCHANGE @ HARTLEY BRIDGE RD

FUND: 1M 2,7/4,35

PE: 1992 ROW: 2001 CST:

UNDERWAY $2,000,000 AFTER 2003

PROJECT: 311910- TYPE WORK: INTERCHANGE

MACON TIP # MCN-15

LENGTH (miles / km)

DESCRPT: 1-75 NEW INTERCHANGE AT,SARDIS CHURCH RD

FUND: NHS 0,2 /0.32

PE: 1997 ROW: 2002 CST: 2003
FEDSh~lre:
GA Share:

UNDERWAY $1,256,000 $6,889,000 $5,511,200 $1,377,800

PROJECT: 311950- TYPE WORK: INTERCHANGE

FUND: NHS

MACON TIP # MCN-54

LENGTH (miles / km) 0.5 /0.81

DESCRPT: 1-475IZEBULON RD INTERCHANGE MODIFICATION {INCL LIGHTING}

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $180,000
$3,978,000 $3,182,400
$795,600

. PROJECT: 311992- TYPE WORK: BARRIERS

FUND:NHS

MACON TIP # MCN-71

LENGTH (miles / km) 0/0.00

, DESCRPT: 1-475 FM 1-75 NR HARTLEY BRDGE RD TO. 1-75/NOISE BARRIER WALL

PE: 1997 ROW: NONE CST: 2002 FED Share: GA Share:

UNDERWAY
. $2,900,000 $2,320,000
$580,000

# :.
W:;

PROJECT: 312090- TYPE WORK: WIDENING

FUND:NHS

MACON TIP # MCN-60

LENGTH (miles / km) 2.47/3.98

DESCRPT: 1-75 FM PIERCE AVE/SR 247/US 41 TO ARKWRIGHT ROAD

EXIST. LANES: 04 PROPOSED LANES: 06

PE: 1998 ROW: 2002 CST: 2003 FED Share: GA Shnre:

UNDERWAY $2,000,000 $9,000,000 $7,200,000 $1,800,000

Page 40 of336

STATE TRANSPORTATioN IMPROVEMENT PROGRAM

~,---,_._._---------

,-9-/2-1/-00_._._-----------

BIBB COUNTY

PROJECT: 322000- TYPE WORK: WIDENING

FUND: STP

MACONTIP#MCN-18

LENGTH (miles 1 km) 2.29/3.69

DESCRPT: SR 87IRIVERSIDE DR/MACON FM HALL RD TO NORTHSIDE DR

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 322005-

PE: 1992 ROW: 2002 CST:

UNDERWAY $1,000,000 AFTER 2003

PROJECT: 32296X- TYPE WORK: WIDENING

FUND: NHS

MACON TIP #

LENGTH (miles / km) 0/0.00

DESCRPT: SR 247/US 129 FM GREEN STREET/GATE I/HOUSTON TO US 41/BIBB

EXIST. LANES: 04 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 322960-

PE:NONE ROW.'NONE CST: NONE

PROJECT: 323010- TYPE WORK: ATMS/ITS

MACON TIP # MCN-17

LENGTH (miles / km)

DESCRPT: ATMS MAINTENANCE IN MACON FOR 2001

FUND: NHS 0/0.00

PE: NONE ROW: NONE
CST: 2001 FED Share:
GA Share:

$200,000 $160,000
$40,000

PROJECT: 323015- TYPE WORK: ATMSIITS

MACON TIP # MCN-17

LENGTH (miles 1 km)

DESCRPT: ATMS MAINTENANCE IN MACON FOR 2002

FUND:NHS 0/0.00

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$200,000 $160,000 $40,000

PROJECT: 323020- TYPE WORK: ATMS/ITS

MACON TIP # MCN-I7

LENGTH (miles 1km)

DESCRPT: ATMS MAINTENANCE IN MACON FOR 2003

FUND: NHS 0/0.00

PE: NONE ROW: NONE CST: 2003 FED Share: GA Share:

$200,000 $160,000
$40,000

PROJECT: 323045- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

MACON TIP # MCN-7

LENGTH (miles/ km) 0.23/0.37

DESCRPT: SR 247IUS 129 SBL @ NOR-SOU RAILROAD S OF MACON CTY LIMIT

EXIST. LANES: 04 PROPOSED LANES: 06

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 331870- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

MACON TIP # MCN-47

LENGTH (miles / km) 0.18 /0.29

ROW: LOCL

DESCRPT: CR 742ITUCKER ROAD@ROCKYCREEK I MI W OF MACON CTY LMTS

CST: 2001

FED Share:

GA Share:

UNDERWAY
$557,000 $445,600 $111,400

;:
~i...:.:_::::-.

PROJECT: 332230- TYPE WORK: PASSING LANES

MACON TIP # MCN-5I

LENGTH (miles / km)

DESCRPT: SR 19 PASSING LANES NB FM MP 19.127 TO MP 20.370

EXIST. LANES: 02 PROPOSED LANES: 03

FUND: STP 1.24 /2.00

PE: 1999 ROW: 2002 CST:

UNDERWAY $137,000
AFTER 2003

Page 41 0/336

_ _

<>"

STATE TRANSPORTATION IMPROVEMENT PROGRAM

l"'._. ,.._..." _ _, ~

_=_._,_. . . "'__ 9/21/00 .._..__ __

"'_.

~"'~,

~-_'_W"'_T

~

~"",..

BIBB COUNTY

PROJECT: 333050- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

'MACON TIP # MCN-69A

LENGTH (miles / km) 0.2/0.32

DESCRPT: SR 87/MAC01'/ AT JOE TAMPLIN IND BLVD& 1-16 - PHASE IA

PE: 2002 ROW: LOCL CST:

..
$5,000 AFTER 2003

PROJECT: 333055~ TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

MACON TIP # MCN-69B

LENGTH (miles / km) 1.2/1.93

DESCRPT: SR 87/MACON FM JOE TAMPLIN EXT TO & ALONG WEAVER RD - PH IB

'PE:1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$3,274,000 $2,619,200 . $654,800

PROJECT: 333090- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

MACON TIP # MCN-43

LENGTH (miles / km) 4.25/6.84

DESCRPT: SR 247IUS 129 FROM HOUSTON CO LINE TO NORTH OF SOFKEE RD

LUMP SUM PROJECT

PE: 1999 ROW: LOCL CST: ~OOI FED Share: GA Share:

UNDERWAY
$935,000 $841,500
$93,500

PROJECT: 333 150- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

MACON TIP # MCN-35

LENGTH (miles / km). 0.25/0.40

DESCRPT: SR I9/US 23 NBL @ WALNUT CREEK EAST EDGE OF MACON

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 333 I51- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

MACON TIP # MCN-35 ,

LENGTH (miles / km) 0.25 /0.40

DESCRPT: SR 19/US 23 SBL @ WALNUT CREEK EAST EDGE OF MACON

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 333 I52- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

MACON TIP # MCN-38

LENGTH (miles / km) 0.24 /0.39

DESCRPT: SR 87/US 23 @ BEAVERDAM CREEK JUST NORTH OF 1-75

PE: 2001 . ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT:, 342080-. ,TYPE WORK: WIDENING

FUND: STP

MACON TIP # MCN-36

LENGTH (miles / km) 0.86/1.38

DESCRPT: JEFFERSON'LE FM WALNUT CK-RECREATION & MILLER'LD TO BRISTOL

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 351095-

PE: 1995 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY . $1,347,000
$2,268,000 $1,814,400
$453,600

PROJECT: 350520~ ,TYPE WORK: WIDENING

FUND: STP

MACON TIP # MCN-22

LENGTH (miles / km) 0.64 /1.03

DESCRPT: FOREST HILL RD IN MACON FROM FORSYTH ROAD TO WIMBISH ROAD

EXIST, LANES: 02 PROPOSED LANES: 04

PE: 1984 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$2,510,000 $2,008,000
$502,000

Page 42 of336

<lJ'

._~.

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

~.......

_

.. - ------~---......-._-_,

BIBB COUNTY

PROJECT: 350960- TYPE WORK: TURN LANES

FUND: STP

MACON TIP # MCN-40

LENGTH (miles / km) 1.3 /2.09

DESCRPT: SR 74 FMW OF 1-475 W/TRN LNES TO EOF LOG CABIN DRiSR 74 SP

PE: 1994 ROW: 1997 CST: 2002 FED Share: GA Shure:

UNDERWAY UNDERWAY $4,040,000 $3,232,000
$808,000

PROJECT: 351080- TYPE WORK: WIDENING

FUND: STP

MACON TIP # MCN-28

LENGTH (miles / km) 1.2/1.93

DESCRPT: JEFFERSONVILLE RD FM RECREATION RD TO FALL LINE FWY/US 80

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 0000835

PE: 1996 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $1,566,000 . $2,500,000 $2,000,000
$500,000

PROJECT: 351090- TYPE WORK: WIDENING

FUND: STP

MACON TIP # MCN-24

LENGTH (miles / km) 0.85/1.37

DESCRPT: JEFFERSONVILLE RD FM EMERY HWYISR 19 TO WALNUT CREEK BRIDGE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 342080-

-,

PE: 1996 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $2,618,000 $1,535,000 $1,228,000 $307,000

PROJECT: 351095- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

MACON TIP # MCN-55

LENGTH (miles / km) 0.22 /0.35

ROW: NONE

DESCRPT: CR 727/JEFFERSONVILLE RD. @ WALNUT CREEK IN NE MACON

CST: 2003

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 342080-

GA Share:

UNDERWAY
$1,235,000 $988;000 $247,000

.,~.....'-.
PROJECT: 351100- TYPE WORK: WIDENING

FUND: STP

PE: 1995

MACON TIP # MCN-26

LENGTH (miles / km) 0.9/1.45

ROW: 2001

DESCRPT: CR 88/LOG CABIN DR FM SR 74/MERCER UNIV DR TO HOLLINGSWORTH

CST: 2003

EXI~T. LANES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 351105-

GA Share:

UNDERWAY $3,865,000 $3,682,000 $2,945,600
$736,400

PROJECT: 351105- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

PE: 1995

MACON TIP # MCN-56

LENGTH.(mi/es / km) 0.22/0.35

ROW: LOCL

DESCRPT: CR 88ILOG CABIN DRIVE @ ROCKY CREEK WEST OF SR 74

CST: 2003

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 351100-

GA Share:

UNDERWAY
$1,549,000 $1,239,200
$309,800

PROJECT: 351 I 10- TYPE WOI/K: WIDENING

FUND: STP

MACON TIP # MCN-30

LENGTH (miles / km} 0.64 /1.03

DESCRPT: LOG CABIN DR FM EISENHOWER PKWY TO MERCER UNIV DRI SR 74

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $1,316,000 $1,591,000 $1,272,800 $318,200

r >.
L~:

PROJECT: 351120- TYPE WORK: WIDENING

FUND: STP

MACON TIP # MCN-31

LENGTH (miles / km) 2.04/3.28

DESCRPT: BLOOMFIELD RDILOG CABIN DR FM ROCKY CK RD TO SR 22/EISENHOWE

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 2002 CST:

UNDERWAY $2,429,000 AFTER 2003

Page 43 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

- - - - , - - - - - - _ .. -_._"~_

.... ..~_,_.

9/21/00

-----

BIBB COUNTY

PROJ~CT: 351140- TYPE WORK: WIDENING

MACON TIP # MCN~29

LENGTH (miles / km)

FUND: STP 2. I /3.38

DESCRPT: NW PK WY-NEW LOC FM LOG CABIN TO NAPIER@PARK ST THEN TO SR 19

. EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1996 ROW: 2002 CST:

UNDERWAY $3.286,000 AFTER 2003

PROJECT: 351150- TYPE WORK: WIDENING

FUND: STP

MACON TIP # MCN-27

LENGTH (miles / km) 0.99/1.59

DESCRPT: CR 79INORTHSIDE DR FM WESLEY AN DR TO FOREST HILL RD/CR 723

EXIST. LANES: 02 PRO~OSED LANES: 04

PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$2,637.000 $2,109,600
$527,400

PROJECT: 362695- TYPE WORK: NEW CONSTRUCTION

FUND: NHS

MACON TIP # MCN-49

LENGTH (miles / km) 1.7412.80

DESCRPT: SR 540/EISENHOWER PKWY FM 1-16 N TO SR 19IUS'80/EMERY HWY

EXIST. LANES: 00 PROPOSED LANES: 04

'I

ASSOCIATED PROJECTS: 36Y695-

PE: 1986 ROW: 2002 CST:

UNDERWAY $1,008,000 AFTER 2003

PROJECT: 363630- TYPE WORK: NEW CONSTRUCTION

FUND: NHS

MACON TIP # MCN-50

LENGTH (miles / km) 1.9/3.06

DESCRPT: SR 540IFALL LINE FWY FM LOWER BOUNDARY ST E TO 1-16

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 36Y630-

. PE: 1992 'ROW:2002
CST:

UNDERWAY $2,174,000 AFTER 2003

PROJECT: 371774- TYPE WORK: BICYCLE/PED.FACILITY

FUND:STP

PE:LOCL

MACON TIP # TEA- I

LENGTH (miles / km) 1/1.61

ROW: LOCL

L~

DESCRPT: OCMULGEE HERIT AGE GR~ENWAY IN MACON

CST: 2001

$1,000,000

FED Share:

$800,000

OTHShare:

PROJECT: 303102- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

MACON TIP #

LENGTH (miles / km) 0/0,00

ROW: NONE

DESCRPT: PURCHASE TRANSIT VEHICLES; BUS WASHER; REPLACE PAINT SHOP

CST: 2001

FED Share:

GA Share: .

OTH Share:

PROJECT: 303103- TYPE WORK: OPERATING

MACON TIP #

LENGTH (miles / km)

DESCRPT: OPERATING ASSISTANCE FOR FY 2001

FlIND: TRANSIT

PE: NONE

0/0.00

' ROW: NONE

CST: 2001

FED Share:

szoo.ooo
$63?,000 $564,000' $71,000
$71,000
$1,736,000 $813,000

PROJECT: 3D3104- TYPE WORK: CAPITAL

MACON TIP #

LENGTH (miles / km)

DESCRPT: PURCHASE BUSES; REPLACEMENT OF PAINT SHOP

~;

.~

kj

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTH Share:

$923,000
$761,000 $676,000
$85,000 $85,000

Page 44 of336

_______________.,..-__._h_. __ . STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

~,......

~~:

BIBB COUNTY

PROJECT: 303105- TYPE WORK: OPERATING

MACON TIP #

LENGTH (miles / km)

DESCRPT: FY-2002 OPERATING ASSISTANCE

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

OTHShare:

PROJECT: 303106- TYPE WORK: MACON TIP # DESCRPT: PURCHASE 6 BUSES

CAPITAL

LENGTH (miles / km)

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTHShare:

PROJECT: 303107- TYPE WORK: CAPITAL MACON TIP # DESCRPT: PURCHASE 6 BUSES

LENGTH (miles / km)

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTH Share:

PROJECT: 3V7036- TYPE WORK: CAPIT AL

MACON TIP #

LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

:- .

~_ ..
PROJECT: DNR252- TYPE WORK: BICYCLE/PED. FACILITY

FUND: REC TRAILS PE: NONE

MACON TIP # DNR- I

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: DNR RECREATIONAL TRAILS PROG - CENTRAL CITY PARK TRAIL HEAD

CST: 2001

FED Share:

OTH Share:

PROJECT: DNR253- TYPE WORK: BICYCLE/PED. FACILITY

FUND: REC TRAILS PE: NONE

MACON TIP # DNR-2

LENGTH (miles r km)

0/0.00

ROW: NONE

DESCRPT: DNR REC TRAILS PROG - PIERCE AVENUE WATER WORKS TRAIL HEAD

CST: 200 I

FED Share:

PROJECT: M000352 TYPE WORK: SHOULDER WORK

MACON TIP #

LENGTH (miles / km)

DESCRPT: SR 74 FM MONROE CO LN TO MOSELEY DIXON RD

LUMP SUM PROJECT

FUND: STP 7.35/ I 1.83

OTH Share:
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

. _" _'
$1,771,000 $621,000
$1,150,000
$450,000 $400,000 $50,000
$50,000
$450,000 $400,000
$50,000 $50,000
$41,000 . $41,000
$11,000
$125,000 $100,000 $25,000
$125,000 $100,000
$25,000
$519,000 $415,200 $103,800

PROJECT: TOOOl37 TYPE WORK: CAPITAL

FUND: TRANSIT

PE: NONE

MACON TIP #

LENGTH (miles / km) 0/0.00

.'

DESCRPT: FY 2003 MACON SECTION 5307 CAPITAL

ROW: NONE CST: 2003 FED Share:

GA Share:

OTH Share:

$662,000 $588,000
$74,000 $74,000

Page 45 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM

.-..""'>..._""""',., ....,..-~--.--_.,--_..._

9/21/00
.... .--"""''''"''''......,--~---..--,-------,_.._ . ~-------.~.- - - - - - -

BIBB COUNTY

PROJECT: T000138 TYPE WORK: CAPITAL

MACON TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 MACON SECTION 5309 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTHShare:

$450,000 $400,000
$50,000 $50,000

PROJECT: TOOOIJ9 TYPE WORK: OPERATING

MACON TIP # .

LENGTH (miles /km)

DESCRPT: FY 2003 MACON SECTION 5307 OPERATING

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

$1,806,000 $709,000

PROJECT: T000140 TYPE WORK: CAPITAL MACON TIP # DESCRPT: FY 2003 MACON SECTION 53 IO

LEi(VGTH (miles / km)

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$1,097,000
$46,000 $46,000 $11,000

PROJECT: TOOOl59 TYPE WORK: CAPITAL

MACON TIP #

LENGTH (miles / km)

DESCRPT: FY 2002 MACON SECTION 5310 CAPITAL

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$43,000 $43,000 $11,000

Page 46 of336

_ _ _ _ .......

STATE TRANSPORTATION IMPROVEMENT PROGRAM

4

9/21/00 . _ _ "I<~_"'

~~~

._,,_"""'"

BLECKLEY COUNTY
PROJECT: 0000123 TYPE WORK: LANDSCAPING LENGTH (miles I km)
DESCRPT: COCHRAN STREETS CAPE

FUND: STP 010.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 222360- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles I km) 2.5 14.03

DESCRPT: SR 87 FM NORTH OF SR 257 NW TO THE COCHRAN BYPASS

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 2001 CST: 2002
GA Share:

$55,000 $44,000
$11,000
UNDERWAY $1,867,000 $4,296,000
$4,296,000

PROJECT: 245336- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (mileslkm) 0.24/0.39

DESCRPT: SR 126 @ GUM SWAMP CREEK 5.8 MI E OF COCHRAN

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

,
"-.

:"; .
i~;~~;'

Page 47of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

,

-

-

-

-

-

-

-

-

.

.

.

.

.

.

-__.

_.<

_.

.

_.",.

.

.

.

.

~-

.

9/21/00
_--._.'"',._-~"'_

.

_~ . ._

_.__ ..~,...""'..-_,-..

_

-

-

-

BRANTLEY COUNTY

PROJECT: 533155- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.25 /0040

ROW: 2001

DESCRPT: SR 32/HARRELL HIGHWAY @BARBERS CREEK 2 MI E OF HORTENSE

CST: 2002

FED Share:

GA Share:

liNDERWAY $10,000
$794,000 $635,200 $158,800

PROJECT: 533156- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles 1 km) 0.21 10.34

ROW: 2001

DESCRPT: SR 32/HARRELL HIGHWAY @ MILL BRANCH 4 MI E OF HORTENSE

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$250,000 $200,000
$50,000

PROJECT: 533157- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

. PE: 1999

LENGTH (miles 1 km) 0.24/0.39

ROW: 2001

DESCRPT: SR 32/HARRELL HIGHWAY @ BROWNTOWN SWAMP 9 MI E OF H~RTENSE

CST: 2002

FED Share:

GA Share:

UNDERWAY . $10,000 $901,000 $720,800 $180,200

PROJECT: 533158- TYPE WORK: REPLACE BRIDGE LENGTH (mi/eslkm)
DESCRPT: SR 15 @ DIX BRANCH IN CITY LIMITS OF HOBOKEN

FUND: BRIDGE 0.21/0.34

PE: 2001 ROW: , CST:

'$20,000 AFTER 2003 AFTER 2003

PROJECT: 570926- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1998

LENGTH (mileslkm) 0.21/0.34

ROW: LOCL

DESCRPT: CR 191 @ SOUTH PRONG BIG CREEK 4.5 MI S OF HOBOKEN

CST: 2002

FED Shure:

GA Share:

UNDERWAY
'\ $605,000 $484,000 $121,000

. ~;;'
:;'.. .~
~:;i:

Page 48 of336

_ ._ __..."" ....,

- - - - - - - - - - - _.._ - - _ . -
STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

,_ _,_ _ w _._""

_ _

_~..".,'"''''I>--...

._a ''''_..... ....' - , ~

BROOKS COUNTY

PROJECT: 0000079 TYPE WORK: LANDSCAPING

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: DOWNTOWN QUITMAN BEAUTIFICATION & PED SAFETY PLAN

PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 431900- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles / km) 0.38/0.61

ROW: LOCL

DESCRPT: CR 305 @ NEGRO BRANCH APPROX 2 MILES WEST OF QUITMAN

CST: 2002
rso suo

GA Share:

$223,000 $178,000
$45,000
UNDERWAY
$1,076,000 $860,800 $215,200

'-.:..

~.(
<..

Page 49 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ - - - - - - - _ . _ - _ . _ - _..........

9/21/00

BRYAN COUNTY

PROJECT: 532602- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 0/0.00 DESCRPT: SR 144 PASSING LANES THROUGH FT STEWART /SEE LONG'-532600

PE:NONE ROW: NONE eST: NONE

ASSOCIATED PROJECTS: 532600-

Lt:'t" -"-:,'
Page 50 of336

_ _.,_"

STATE TRANSPORTATJ(iN IMPROVEMENT PROGRAM

.__

. . ._9._/21_/0..0

_""'''''_~w_,_._

"_~

.__.__

BULLOCH COUNTY

PROJECT: 0001076 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: MIN. GUARAN PE: 2001

LENGTH (miles / km) 0.46/0.74

ROW: LOCL

DESCRPT: SR 26/US 80 AT AKINS POND RD/CR 9 NORTH OF STATESBORO

CST:

$23,000 AITER 2003

PROJECT: 521270- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 1.4 /2.25

DESCRPT: SR 67 FM JUST S OF CR 248/585 NORTH TO 5-LN & @ OGEECHEE RR

EXIST. LANES: 02 PROPOSED LANES: 05

PE: 1992
ROW: 1997
CST: 2001
reo sno
GA Share:

UNDERWAY UNDERWAY $5,242,000 $4,193,600 $1,048,400

PROJECT: 522460- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 67 FM 1-16 TO STATESBORO BYP EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 10.9/17.48

PE:2002 ROW: CST:

$2,000,000 AITER 2003 AITER 2003

PROJECT: 522465- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

PE: 1992

LENGTH (miles / km) O. 12/ O. I9

ROW: 2001

DESCRPT: SR 67 @ WOODCOCK BRANCH & ZETTEROWER BRANCH

CST: 2001

FEDShllre:

GA,Share:

UNDERWAY $10,000
$2,405,000 $1,924,000
$481,000

PROJECT: 522640- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 6.85 / 11.03

DESCRPT: E. STATESBORO BYP/SR 1018 FROM SR 73/US 25 TO SR 73/US 301

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1997 ROW: 2002 CST:

UNDERWAY $460,000
AITER2003

PROJECT: 522650- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 4.917.89

DESCRPT: W.BYPASS/SR 67/US 25 FM SR 73/US 25 NW TO SR 26/US 80

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 2001 CST: 2001
GA Shure:

UNDERWAY $50,000
$4,400,000
$4,400,000

PROJECT: 542040- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: CR 927 @ MA~ BRANCH 9 MI S OF BROOKLET

FUND: BRIDGE

PE: 1998

0.2/0.32

ROW: LOCL

CST: 2001

FEDShllre:

GA Share:

UNDERWAY
$598,000 $478,400 $119,600

PROJECT: 542380- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 46 @ LOTTS CREEK 1.8 MI E OF REGISTER

FUND: BRIDGE

PE: 1999

0.27/0.43

ROW: 2001

CST: 2001

FED Share:

GA Share:

UNDERWAY $10,000
$1,486,000 $1,188,800
$297,200

Page 51 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM
--------_._-_.__._--, --_. 9/21/00 _-_._---,--------

BURKE COUNTY

PROJECT: 222100- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 5.9/9.50

DESCRPT: SR 1211US 25 FM WAYNESBORO BYPASS @ CR 451 TO CR 438

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 22Y100-

PE: 1993 ROW: 2001 CST: 2001 FED Share: ,GA Share:

UNDERWAY , $1,210,000 $12,874,000 $10,299,200
$2,574,800

PROJECT: 222110- TYPE WORK: WIDENING

FUND:NHS

LENGTH (miles / km) 10 / 16.10
ro DESCRPT: SR 121IUS 25 FM CR 438/BURKE CO SR 88 IN RICHMOND CO

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 2221IX- 22YI10-

PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $6,468,000
$16,298,000 $13,038,400
$3,259,600

PROJECT: 222480- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 8.8 / 14., 7

DESCRPT: SR 121/US 25 SAVANNAH RIVER PKY FM CR 118/354 TO SR 24 @BYP

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 22Y480-

PE: 1993 ROW: 2003 CST:

UNDERWAY $2,526,000 AFTER 2003

PROJECT: 22255X- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 0/0.00

DESCRPT: SR I21IUS 25/SA VN RVR PKWY FM CR 16 TO CR 118/JENKINS-i22550

EXIST. LANES: 02 PROPOSEP LANES: 04

ASSOCIATED PROJECTS: 222550-

. ~':'
PROJECT:,231260- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km)5.63 /9.06

DESCRPT: SR 24 PASSING LNS @ 4 LOC BET WAYNESBORO&LOU'VILLEIJEFFERSON

EXIST. LANES: 02 PROPOSED LANES: 03

ASSOCIATED PROJECTS: 23I26X-

PE:NONE ROW: NONE CST: NONE

PE: 1997 ROW: 2002 CST:

UNDERWAY $100,000
AFTER 2003

\
~. . ~~:.:.:;;.

Page 51 of336

_ _ _ _~

STATE TRANSPORTATioN IMPROvEMENT PROGRAM

,

, ., 9/21/00

=..

w_._. .__, ._.

_._,,,~,""

_

BUTTS COUNTY
PROJECT: 0000149 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles / km)
DESCRPT: INDIAN SPRINGS HOTEL PHASE 2

FUND: STP
0/0,00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000523 TYPE WORK: INTERCHANGE LENGTH (miles / km)
DESCRPT: SR 16/ARTHUR BOLTON PKWY AT 1-75 EXIST. LANES: 02 PROPOSED LANES: 04

FUND: 1M 0.83 /1.34

OTHShare:
PE: 1997 ROW: 2003 CST:

$313,000 $250,000
$63,000
UNDERWAY $9,800,000 AFTER 2003

PROJECT: 33182X- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: SR 36 FM HIGH FALLS RD TO .lUST WEST OF 1-75;SEE LAMAR

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 331820-

PROJECT: 332360- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 3.74/6.02

DESCRPT: SR 42IUS 23 PPL @ MPI 0.60-11.881 MPI 1.88- I3.35[ MP 14.3-15.3

EXIST. LANES: 02 PROPOSED LANES: 03

ASSOCIATED PROJECTS: 33236X-

PROJECT: 332510- TYPE WORK: REPLACE BRIDGE

FUND: STP

LENGTH (miles / km) 0.9/1.45

DESCRPT: SR 16 OVER OCMULGEE RIVER AT JASPER CL(M.L. 17.45)

PE:NONE
ROW: NONE CST: NONE

PE: 1999 ROW: 2002 CST:

UNDERWAY $149,000
AFTER 2903

PE: 1997
ROW: 2001 CST:

UNDERWAY $89,000
AFTER 2003

PROJECT: 33252X- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 0 /0.00

DESCRPT: SR 16/ARTHUR BOLTON PKWY NR REHOBOTH RD TO 1-75/SEE 332520

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 332520-

PE:NONE
ROW: NONE CST: NONE

PROJECT: 333170- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.23 /0.37

DESCRPT: SR 36@TOWALIGA RIVER 7.5 MI SW OF JACKSON

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

l~:

PROJECT: 333172- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.28/0.45

DESCRPT: SR 36 @ SOUTH RIVER AT BUTTS-NEWTON CO LINE

ASSOCIATED PROJECTS: 33317X-

PH: 2001 ROW: CST:

$34,000 AFTER 2003 AFTER 2003

Page 53 of336

STATE TRANSpqRTAT!ON IMPROVEMENT PROGRAM
9/21/00

BUTTS COUNTY

PROJECT: 343450- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2001 .

LENGTH (miles I km) 0.27/0.43

ROW: LOCL

DESCRPT: CR 290/FINCHERVILLE ROAD @ TUSSAHA W CREEK 5 MI N OF JACKSON

CST: 2002

FED Share:

GA Share:

OTHShare:

PROJECT: M000542 TYPE WORK: SHOULDER WORK

FUND: NHS

LENGTH (miles/km) 21.7/34.99

DESCRPT: SR 40)/1-75 FM S OF SR )6/BUTTS TO S OF WALT STEPHENS/HENRY

L UMP SUM PROJECT

PE:NONE ROW: NONE CST: 200) FED Share: GA Share:

$28,000
$950,000 $760,000 $95,000 $95,000
$) 0,000,000 $8,000,000 $2,000,000

,;

Page 54 of336

STATE TRANSPORTATION IMPROvEMENT PROGRAM
9/21/00

CALHOUN COUNTY
PROJECT: 0000080 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles / km)
DESCRPT: ARLINGTON RR DEPOT REHAB

FUND:STP 0/0.00

PE:LoCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 442950- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 216 @ LITTLE PACHITLA CREEK 1 MI N OF EDISON

FUND: BRIDGE 0.22/0.35

PE: 1999 ROW: 2003 CST:

$104,000 $83,000
$21,000
UNDERWAY $10,000
AFTER 2003

v.


.
-,:"
t~T

Page 55 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

CAMDEN COUNTY
PROJECT: 0000067 TYPE WORK: LANDSCAPING . LENGTH (miles / km)
DESCRPT: KINGSLAND STREETSCAPE PHASE II

FUND: STP 0/0:00

PE: LOCL ROW: LOCL . CST: 2001 FED Share:

PROJECT: 0000069 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: WOODBINE WALKWAY AND RIVERWALK PHASE 2

FUND:STP 0/0.00

OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000070 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: ST. MARYS HISTORIC WATERFRONT PROJECT PHASE I

FUND:STP 0/0.00

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000689 TYPE WORK: REST AREA

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: RECONSTRUCTION OF THE 1-95NORTH BOUND WELCOME CENTER

OTH Share:
PE: 2001 ROW: 2003 CST:

$250,000 $200,000 $50,000
$250,000' $200,000
$50,000
$625,000 $500,000 $125,000 $200,000 $150,000 AFTER 2003

PROJECT: 511084- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 6.76 / 10.88

DESCRPT: 1-95 FM CR 138 TO US 17/GLYNN & BR@L SATILLA RIVER--51108X

EXIST. LANES: 04 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 51108X-

PE: 1994 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$25,806,000 $20,644,800
$5,161,200

PROJECT: 51141 X- TYPE WORK: REST AREA

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SAVANNAH & KINGSLAND WELCOME CNTRS ON 1-95/BATHROOMS/CHATHAM

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 511410-

PE:NONE ROW: NONE CST: NONE

PROJECT: 521910- . TYPE WORK: WIDENING

FUND: STP

LENGTH (mi/es/km) 3.3/5.31

DESCRPT: SR 40 FM KINGS 'BAY RD SE TO SR 40 SPUR AND SIDEWALKS

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 1998 CST: 2001 FED Share: GA Share: OTH Share:

PROJECT: 522690- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.1/0.16

DESCRPT: SR 25/US 17 BRIDGE OVER ST. MARY'S RIVER /FLA STATE LINE

PE: 1993 ROW: 2001 CST:

UNDERWAY UNDERWAY
$6,791,000 $5,432,800
$358,200 $1,000,000
UNDERWAY $5,000
AFTER 2003

Page 56 of336

-"--~,-----

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/0J

CAMDEN COUNTY

PROJECT: 571431- TYPE WORK: WATER POLLUTION MITIG.

FUND:STP

LENGTH (miles / km) 0/0.00

DESCRPT: WETLAND MITIGATION SITE NEAR WOODBINE WEST OF SR II O@SATILLA

LUMP SUM PROJECT

PE:NONE ROW: 2001 . CST: NONE

$700,000 .

,.
~,
l_,
Page 57 0/336

----_._--_.

STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00

CANDLER COUlYTY

PROJECT: 0000071 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

PE: LOCL

..,

LENGTH (miles / km) 0 / 0.00

ROW: LOCL

DESCRPT: SIDEWALKS/BIKE LANES TO LINK COMMUNITY SERVICES IN METTER

CST: 2001

$250,000

FED Share:

$200,000

OTH Share:

PROJECT: 0000691 TYPE WORK: REST AREA

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: 1-16 CONSTRUCTION OF A NEW REST AREA IN MEDIAN AT MP 97

PE: 2001 ROW: NONE CST:

$50,000 $350,000 AFTER 2003

PROJECT: 542402- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 129@CANOOCHEE RIVER OfF 4 MI S OF METTER

FUND: BRIDGE
0.22 i 0.35

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

~-'':
L>
Page 58 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9121100

--------

CARROLL COUNTY
PROJECT: 0000110 TYPE WORK: LIGHTING LENGTH (miles / km)
DESCRPT: DOWNTOWN CARROLLTON STREETSCAPE

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$1,250,000 $1,000,000

PROJECT: 631300- TYPE U:ORK: WIDENING

FUND: STP

LENGTH (miles / km) 4.517.25

DESCRPT: SR 166 FM CR 828/141 TO 4-LN/CARROLLTON ..INCL BRIDGES

EXIST. LANES: 02 PROPOSED LANES: 04

OTH Share:
PE: 1992 ROW: 2003 CST:

$250,000
UNDERWAY $6,728,000 AFTER 2003

PROJECT: 631320- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 1.65 /2.66

DESCRPT: SR 16/US 27ALT FM SR 166 SE TO W OF STRIPLING CHAP RD/CR 24

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 2002 CST:

UNDERWAY $1,761,000 AFTER 2003

PROJECT: 631490- TYPE WORK: NEW CONSTRUCTION

FUND: STP

LENGTH (miles / km) 1.4 /2.25

DESCRPT: VILLA RICA BYP EXTEND W.FM PROPOSED SR 61 BYPASS TO SR 101

EXIST. LANES: 00 PROPOSED LANES: 02
r
ASSOCIATED PROJECTS: 662540-

PE: 2001 ROW: CST:

$134,000 AFTER 2003 AFTER 2003

PROJECT: 632865- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.86/1.38

DESCRPT: SR 61 AT SANDHILL-HICKORY LEVEL RD/CR 394 & OLD SR 61/CR 945

LUMP SUM PROJECT

PE: 1999 ROW: 2001 CST: 2001 FED Share: GA Share:

UNDERWAY $1,000
$309,000 $278,100
$30,900

PROJECT: 641910- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 100 NB MP 5.5-6.81 NB MP 13.3-14.551 SB MP 15.3-16.8 EXIST. LANES: 02 PROPOSED LANES: 03

FUND: STP 4.05 /6.52

PE: 1993 ROW: 2000 CST: 2002 FED Share: GA Share:

UNDERWAY UNDERWAY
$2,419,000 $1,935,200
$483,800

PROJECT: 642080- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles/km) 0.21/0.34

ROW: LOCL

DESCRPT: CR 834/SMITHFIELD ROAD @ INDIAN CREEK 4 MI NORTH OF BOWDON

CST: 2001

FED Share:

GA Share:

UNDERWAY
$375,000 $300,000 $75,000



PROJECT: 642090- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

UNDERWAY

LENGTH (miles / km) 0.21 /0.34

ROW: LOCL



DESCRPT: CR 523/JONES MILL ROAD @ SNAKE CREEK 1.5 MI N OF WHITESBURG

CST: 2001 FED Share:

$702,000 $561,600

GA Share:

$140,400

Page 59 of336

S

T

A

T

E

T

R

A

N

S

P

O

R

T

A

T

I

O

N

I

M

P

R

O

V

E.M

E

N

T

P

R

O ;

G ~

R

A

M

9/21/00

CARROLL COUNTY

PROJECT: 642310- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.3 /0.48

ROW: LOCL

DESCRPT: CR 829/CLEM-LOWELL RD @ WHOOPING CREEK SOUTH OF CARROLLTON

CST: 2002

FED Share:

GA Share:

UNDERWAY
$704,000 $563,200 $140,800

PROJECT: 64242X- TYPE WORK: NEW CONSTRUCTION

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: SR 997 FM PLEASANT RDG@HUTCHESON TO SR 8@CASHTOWN RlHARALSON

EXIST. LANES: 00 PROPOSED LANES: 02

ASSOCIATED PROJECTS: 642420-

PE:NONE ROW: NONE CST: NONE

PROJECT: 650620- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) . 1.1 / 1.77
DESCRPT: SR 16/CARROLLTON FM COLUMBIA RD TO SR I DRAINAGE IMPROVMENTS

PE: 2001 ROW: 2002 CST:

$100,000 $55,000
AFTER 2003

PROJECT: 662540- . TYPE WORK: NEW CONSTRUCTION

FUND: OTHER

,

LENGTH (miles / km) 1 /1.61

DESCRPT: SR 61 CONN FM N OF NS RR BRIDG.E @ DOUGLAS CL TO SR 61

EXIST. LANES: 00 PROPOSED LANES: 02

ASSOCIATED PROJECTS: 631490-

PE: 2001 ROW: CST:

$220,000 AFTER 2003 AFTER 2003

PROJECT: 811064- TYPE WORK: WEIGH STATION

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: 1-20: UPGRADE WB & NEW EB WEIGH STATIONS INCL SCALE REPL

ASSOCIATED PROJECTS: .. 81Y064-

PE: 1995 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $100,000
$9,900,000 $8,910;000
$990,000

Page 60 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

CATOOSA COUNTY

PROJECT: 611210- TYPE WORK: INTERCHANGE

CHATTANOOGA TMA TIP # GA-OI

LENGTH (mileslkm)

DESCRPT: 1-75 AT SR I 46/CLOUD SPRINGS ROAD

FUND:NHS 0.59/0.95

PE: 1999 ROW: 2001 CST:

UNDERWAY $5,000,000 AFTER 2003

PROJECT: 61131Z- TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles 1 km} 0/0.00

DESCRPT: I-59 @ 3 LOQI-24 @ 111-75 @ 4/WHITFIELD-SEE DADE-61131 O\XIZ

ASSOCIATED PROJECTS: 611310-

PE.NONE ROW: NONE CST: NONE

PROJECT: 621530- TYPE WORK: WIDENING

FUND: STP

CHATT ANOOGA TMA TIP # STP-98-2

LENGTH (miles 1 km)

2/3.22

DESCRPT: SR 151 FM ROLLINS IND PK/HOLCOMB RD TO US 41 @ RINGGOLD-&"Y"

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 62Y530-

PE: 1992 ROW: 2001 CST: 2003 FED Shure: GA Shure:

UNDERWAY $1,796,000 $2,405,000 $1,924,000 $481,000

PROJECT: 62Y530- TYPE WORK: WIDENING

FUND: 1M

CHATTANOOGA TMA TIP # STP-98-11

LENGTH (miles 1 km) 0/0.00

DESCRPT: SR 151 FM CR 179/666 TO US-41\SHOW IM$ FOR RAMPS/62 I 530

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 621530-

PE:NONE ROW: 2001 CST: 2003 FED Shure: GA Share:

$1,237,000 $3,469,000 $3,122,100
$346,900

PROJECT: 632885- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km}
DESCRPT: SR 3/US 41 @ TIGER CREEK 1.9 MI EAST OF RINGGOLD'

FUND: BRIDGE

PE: 2001

0.24 10.39

ROW: 2002

CST: 2003

FED Shure:

GA Share:

$20,000 $10,000 $593,000 $474,400 $118,600

PROJECT: 642210- TYPE WORK: WIDENING

CHATTANOOGA TMA TIP # STP-98(3)

LENGTH [miles 1 km)

DESCRPT: SR I46/CLOUD SPGS RD FM 1-75 NORTH TO SR 3/US 41

EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 0.59/0.95

PE: 1999 ROW: 2001 CST: 2003 FED Share: GA Shure:

UNDERWAY $314,000
$1,716,000 $1,372,800
$343,200

PROJECT: 642220- TYPE WORK: WIDENING

FUND: STP

CHATTANOOGATMA TIP# STP-98(4)

LENGTH (miles Ikm) 2.2/3.54

DESCRPT: SR 146 FM SR I/US 27 EASTWARD TO LAKEVIEW RD/CR 553

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2000 ROW: 2001 CST:

UNDERWAY $1,256,000 AFTER 2003

-,
PROJECT: 642230- TYPE WORK: WIDENING

FUND: STP

CHATTANOOGA TMA TIP # STP-98(5)

LENGTH (miles 1 km) 3.09/4.97

DESCRPT: CR'S 381-245 & 244 FM SR 3/US 41 NORTHWARD TO TENN STATE LIN

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2001 ROW: LOCL CST:

$48,000 AFTER 2003

Page 61 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

. ------..-..-...- _----_ - 9/21/00
->-;_:.~--,-"",,,,----,,,-~,,,,,,<",,,<,,,,,",-,,,....--~.........,,.. ..._ - - _ . _ -

....

.

CATOOSA COUNTY

PROJECT: 642240- TYPE WORK: WIDENING

CHATTANOOGA TMA TIP # STP-98(6)

LENGTH (miles r km)

DESCRPT: SR 3/US 41 FM SR 15I NORTHWESTLY TO SR 146

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 631505-

FUND: STP 7.21 I 11.61

PE: 1999 ROW: 2003 CST:

UNDERWAY $1,200,000 AFTER 2003

PROJECT: 650430- TYPE WORK: WIDENING

FUND: STP

CHATTANOOGA TMA TIP # STP-99-1

LENGTH (miles I km) 1.45/2.33

DESCRPT: SR 3/US 41 FM SOUTH OF HIGHLAND RD/CR 40 TO FRAWLEY RDITENN

EXIST; LANES: 02 PROPOSED LANES: 04

PROJECT: 650440- TYPE WORK: WIDENING

FUND: STP

CHATTANOOGA TMA TIP # STP-99-2

LENGTH (miles ? km) 2.34/3.77

DESCRPT: SR I46/CLOUD SPGS RD FM LAKEVIEW DR TO 1-75 & BRIDGE &65Y440

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 65Y440-

PE: 1993 ROW: 1998 CST: 2003 FED Share:
ornsuo
PE: 1992 ROW: 2001 CST:

UNDERWAY UNDERWAY
$2,965,000 $2,106,000
. $859,000
UNDERWAY $3;074,000 AFTER 2003

PROJECT: 65Y440- TYPE WORK: WIDENING

FUND: STP

CHA TTANOOGA TMA TIP # STP-98-2

LENGTH (miles I km)

0 10.00

DESCRPT: SR I46/CLOljD SPGS RD FM LAKEVIEW DRTO I~751FOR Q23 $1650440

EXIST. LANES: 02 PROPOSED LANES: 05

ASSOCIATED PROJECTS: 650440-

PE: 1992 . ROW: 2001
CST: NONE

UNDERWAY $1,075,000

PROJECT: 670710- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

CHATTANOOGA TMA TIP # BRZ-98- i

LENGTH (miles I km) 0.5 10.8 I

PE: 1995 ROW: 2001

DESCRPT: CR 259 SOUTH OF RINGGOLD @ LITTLE CHICKAMAUGA CRK & RELOCATE

CST: 2001

FED Share:

GA Share:

UNDERWAY $220,000
$1,092,000 $873,600 $218,400

PROJECT: 671218- TYPE WORK: LANDSCAPING

FUND: STP

CHATTANOOGA TMA TIP #

LENGTH (miles I km) 0 10.00

DESCRPT: STREETSCAPES & SIDEWALKS IN THE CITY OF FORT OGLETHORPE

PE:LOCL ROW: LOCL CST: 2001 , FED Share:

OTHShare:

PROJECT: M000437 TYPE WORK: BRIDGES

FUND: NHS

LENGTH (miles I km) 0 10.00

DESCRPT: DECK REPLACEMENT/REHAB @ SEVERAL LOC IN CATOOSA COIPE ONLY

LUMP SUM PROJECT

PE:2001 ROW: NONE CST: NONE

$750,000 $600,000
$150,000 $40,000

PROJECT: M000438 TYPE WORK: RAMP

FUND: 1M

PE: 2001

$80,000

LENGTH (miles I km) 0/0.00

ROW: NONE

DESCRPT: SR 401/1-75 WEIGH STATION(SOUTHBOUND SIDE)

CST: 2001

$350,000

LUMP SUM PROJECT

FED Share: GA Share:

$280,000
D
$70,000

Page 62 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _ _ _ _ _ _ _ _ _ _ _ _ _~.

=

9/21/00 __..

0- _.



.~_

. CHARLTON COUNTY
PROJECT: 0000124 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles / km)
DESCRPT: FOLKSTON STREESCAPE; MUSEUM & WELCOME CENTER

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 522350- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / kin) 2.5 /4.03

DESCRPT: SR 40 EIFOLKSTONI MP 2.75/E OF CR 82/KENNISONS RD TO MP 5.0

EXIST. LANES: 02 PROPOSED LANES: 04

OTH Share:
PE: 1992 ROW: 2001 CST: 2001 FED Share: GA Share:

$118,000 $94,000
$24,000
UNDERWAY $100,000
$2,782,000 $2,225,600
$556,400

e. :-: .

..~v ':.
~~i'
Page 63 0/336

,-------------------------------------------~~--- -
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

CHATHAM COUNTY

PROJECT: 0000072 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

PE: LOCL ,

SAVANNAH TIP # 2000-H-17

LENGTH (miles / km) 0/0.00

ROW: LOCL

DESCRPT: TOM TRIPLETT COMMUNITY PARK TRAIL & OGEECHEE CANAL MASTER PL

CST: 2001

FED Share:

$500,000 $400,000

OTHShare:

PROJECT: 0000538 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

SAVANNAH TIP # 2000-H-18

LENGTH (miles / km)

0/0.00

DESCRPT: COASTAL GEORGIA GREENWAY-MULTI-USE TRAILS-9 COUNTIES

','

PE:LOCL ROW: LOCL CST: 2001 FED Share:
'OTH Share:

PROJECT: 0000539 TYPE WORK: BICYCLE/PED. FACILITY

SAVANNAH TIP # 2000-H-16

LENGTH (miles / km)

DESCRPT: GARDEN CITY BIKE LANE

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$100,000
$500,000 $400,000 $100,000,
$300,000 $240,000

OTHShare:

PROJECT: 0000676 TYPE WORK: NEW CONSTRUCTION

FUND: NHS

SAVANNAH TIP # 2001-H-03

LENGTH (miles / km) 0/0.00

DESCRPT: HS TRUMAN PKWY PH3 CT 2 - SKIDA WAY RD @ EISENHOWER DR

EXIST. LANES: 00 PROPOSED LANES: 04

PE: 1992 ROW: LOCL CST: 2001 FED Share: GA Share:

$60,000
UNDERWAY
$1,167,000 $933,600 $233,400

PROJECT: 0000690 TYPE WORK: REST AREA

FUND: 1M

SAVANNAH TIP # 2001-H-02

LENGTH (miles / km) 0/0.00

DESCRPT: RECONSTRUCTION OF THE 1-95 SOUTH BOUND WELCOME CENTER

PE: 2002 ROW: 2003 CST:

$200,000 $150,000 AFTER 2003

PROJECT: 511410- TYPE WORK: REST AREA

FUND: 1M

PE: 200 I

SAVANNAH TIP # 200 I-H-OI

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: SAVANNAH & KINGSLAND WELCOME CNTRS ON I-95/BATHROOMS/CAMDEN

CST: 2002

LUMP SUM PROJECT

FED Share:

ASSOCIATED PROJECTS: 51141X-

GA Share:

$35,000
$265,000 $238,500
$26,500

PROJECT: 521505- TYPE WORK: NEW CONSTRUCTION

FUND: HPP

PE: 1992

SAVANNAH TIP # 87-H-IO

LENGTH (miles / km) 1.9/3.06

ROW: LOCL

DESCRPT: HARRY S.TRUMAN PKY/PH IV FM WHITFIELD AVE TO MONTGOMERY X-RD

CST: 2002

EXIST. LANES: OO,YROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 52Y505-

GA Share:

UNDERWAY
$7,766,000 $6,212,800 $1,553,200

PROJECT: 521508- TYPE WORK: NEW CONSTRUCTION

FUND: NHS

PE: 1992

SAVANNAH TIP # 87-H-09

LENGTH (miles / km) 2.2/3.54

ROW: LOCL

DESCRPT: HARRY S.TRUMAN PKY/PH lIlA FM MONTGOMERY X-RD TO DERENNE AVE

CST: 2001

EXIST. LANES: 00 PROPOSED LANES: 04

, FED Share:

GA Share:

UNDERWAY
$22,540,000 $ I8,032,000
$4,508,000

Page 64 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

---- ----_. __ 9/21/00

------,-_._--,~--_.

._-,-

CHATHAM COUNTY

PROJECT: 521860- TYPE WORK: WIDENING

FUND: STP

SAVANNAH TIP # 90-H-6

LENGTH (miles / km) 3.69/5.94

DESCRPT: SR 25 FM 4-LN N/SR 204 NE TO SR 307 (lNCLD TWO BRDGES &BIKE)

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 1998 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$6,049,000 $4,839,200 $1,209,800

PROJECT: 52217X- TYPE WORK: WIDENING

FUND: STP

SAVANNAH TIP # 96-H-5

LENGTH (miles / km) 0/0.00

DESCRPT: SR 17/US 80 FM SR 17 TO CHERRY ST IN BLOOMINGDALE/EFFINGHAM

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 522170-

PE.'NONE ROW: NONE CST: NONE

PROJECT: 522490- TYPE WORK: WIDENING

FUND: HPP

SAVANNAH TIP # 93-H-03

LENGTH (miles I km) 5.77 /9.29

DESCRPT: SR 26IUS80 FM W OF BULL RIVER TO E OF LAZARETTO CRK & "Y"

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 52Y490-

PE: 1994 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $593,000
$2,735,000 $2,188,000
$547,000

PROJECT: 523230- TYPE WORK: ATMSIITS

FUND: NHS

SAVANNAH TIP # 2000-H-02

LENGTH (miles I km) 0 10.00

DESCRPT: ATMS: SAVANNAH/CHATHAM COUNTY/GDOT REGIONAL TCC

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$1,000,000 $800,000 $200,000

PROJECT: 523235- TYPE WORK: ATMS/ITS

SAVANNAH TIP # 2000-H-03

LENGTH (miles I km)

DESCRPT: ATMS: SAVANNAH SLO SCAN/CMS/RADAR

FUND: NHS 0/0.00

PE: NONE ROW: NONE CST: 2003 FED Share: GA Share:

$1,650,000 $1,320,000
$330,000

PROJECT: 52Y490- TYPE WORK: WIDENING

FUND: STP

SAVANNAH TIP # 93-H-3

LENGTH (miles I km) 5.16/8.31

DESCRPT: SR 26IUS80 FM W OF BULL RIVER TO E OF LAZARETTO qSEE 522490

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 522490-

PE: 1994 ROW: NONE CST: 2003 FED Share: GA Share:

UNDERWAY
$35,414,000 $28,331,200
$7,082,800

PROJECT: 52Y505- TYPE WORK: NEW CONSTRUCTION

FUND: NHS

SAVANNAHTIP#87-H-IO

LENGTH (miles Zkm) 1.9/3.06

DESCRPT: HARRY S,TRUMAN PKY/PH IV FM WHITFIELD TO MONTOGMERY--Q05 $

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 521505-

PE: 1992 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$2,318,000 $1,854,400
$463,600

~~ ~
l:;:

PROJECT: 532570- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

SAVANNAH TIP # 93-H-12

LENGTH (miles I km) 0.12 10.19

DESCRPT:ABERCO~ST @ TIBETAVE

PE: 1995 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$767,000 $613,600 $153,400

Page 65 of336

_ , _ _._,_.~

STATE TRANSPORTATION IMPROVEMENT PROGRAM

--.re_.__. __ __ 9/21/00
>o:,.....-.._._. .._ '...

~_.

._,_t""_"" _ _

__

~";"'''''''_''''

CHATHAM COUNTY

PROJECT: 532750- TYPE WORK: TURN LANES

FUND: STP

SAVANNAH TIP # 97-H-OI

LENGTH (miles / km) 0.3 I /0.50

DESCRPT:. SR 204/ABERCORN ST. @ EGRESS LN/OGLETI-IORPE MALL IN SAVANNAH

PE: 1998 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$750,000 $675,000
$75,000

PROJECT: 532760- TYPE WORK: TURN LANES

SAVANNAH TIP # 97-H-02

, LENGTH (miles / km)

DESCRPT: SR 2041ABERCORN ST. @ DERENNE ,AVE IN SAVANNAH

FUND:STP 0.2/0.32

PE: 1998 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$174,000 $156,600
$17,400

PROJECT: 532770- TYPE WORK: TURN LANES

SAVANNAH TIP # 97-H-03

LENGTH (miles / km)

DESC.RPT: SR 204/ABERCORN ST. @APACHEAVE IN S.AVAN' NAH

FUND:STP 0.47/0.76

PE:1998
ROW: LOCL
, CST: 2002
FED Share:
GA Share:

UNDERWAY
$234,000. $21Q,600
$23,400

PROJECT: 532780- TYPE WORK: TURN LANES

SAVANNAH TIP # 97-H-04

LENGTH (miles / km}

DESCRPT: SR 2041ABERCORN ST. @ LARGO DRIVE IN SAVANNA,H

FUND:STP 0.41/0.66

PE: 1998 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$277,000 $249,300 $27,700

PROJECT: 533070- TYPE WORK: REPLACE BRIDGE

FUND: STP

SAVANNAH TIP # 2000-H-06

LENGTH (miles / km) 0.2 /0.32

DESCRPT: SR 26NICTORY DRIVE OVER PLACENTIA CANAL IN THUNDERBOLT.

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$451,000 $360,800
$90,200

PROJECT: 533 I 60- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

SAVANNAH TIP # 2001-H-04

LENGTH (miles / km) 0,23/0.37

PESCRPT: SR 25/0CEAN HIGHWAY @ CSX RAILROAD 5 MI N OF SAVANNAH

PE: 2001 ROW: CST:

.' $20,000 AFTER 2003 AFTER 2003

PROJECT: 533200- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

SAVANNAH TIP # 2000-H-14

LENGTH (miles / km) 0.2 /0.32

DESCRPT: SR 204/ABERCORN EXTENSION @ HARMON CANAL N OF WHITE BLUFF

PE: 2003 ROW: CST:

$35,000 AFTER 2003 AFTER 2003

,'.
L

PROJECT: 533205- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

SAVANNAH TIP # 2000-H- I 5

LENGTH (miles / km) 0.22 /0.35

DESCRPT: CR 302/MONTGOMERY CROSS RD @CASEY CANAL I MI E OF SR 204

PE: 2003 ROW: LOCL CST:

$20,000 AFTER 2003

Page 66 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
...._-_._.""-------_._......_-,_.""'-,-'- - - 9/21/00

CHATHAM COUNTY

PROJECT: 550550- TYPE WORK: WIDENING

FUND: STP

SAVANNAH TIP # 92-H-03

LENGTH (miles / km) 3.2/5.15

DESCRPT: SR 204 SPURJDIAMOND CSWY FM FERGUSON AVE TO MCWHORTER RD

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $1,810,000
$26,071,000 $20,856,800 $5,214,200

PROJECT: 550575- TYPE WORK: REALIGNMENT

FUND: STP

SAVANNAH TIP # 2000-H-05

LENGTH (miles I km) 1.32/2.13

DESCRPT: PERIMETER RD RELOCATIO,N (PHASE I OF MONTGOMERY X WIDENING)

PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$846,000 $676,800 $169,200

PROJECT: 562165- TYPE WORK: WIDENING

SAVANNAH TIP # 99-H-04

LENGTH (miles / km)

DESCRPT: SR 307/DEAN FOREST ROAD FM R.B. MILLER RD TO SR 21

EXIST. LANES: 04 PROPOSED LANES: 05

FUND: STATE I /1.6 I

PE:NONE ROW: 2002 CST: 2003

GA Share:

$300,000 $600,000
$600,000

PROJECT: 571406- TYPE WORK: HISTORIC PRESERV AnON

SAVANNAH TIP # 99-H-5

LENGTH (miles / km)

DESCRPT: CENTRAL OF GA RAILROAD BUILDINGS IN SAVANNAH

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 505033- TYPE WORK: CAPITAL

SAVANNAH TIP #

LENGTH (miles / km)

DESCRPT: CAPITAL MAINT. ITEMS; OFFICE EQUIP.; FACILITY MOD.

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Sit are:

GA Share:

OTH Share:

PROJECT: 505034- TYPE WORK: OPERATING

SAVANNAH TIP #

LENGTH (miles / km)

DESCRPT: TRANSIT OPERA TING ASSISTANCE FOR FY 200 I

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

PROJECT: 505035- TYPE WORK: CAPITAL

SAVANNAH TIP #

LENGTH (miles / km)

DESCRPT: BUSES AND FACILITIES

PROJECT: 505037- TYPE WORK: CAPITAL SAVANNAH TIP # DESCRPT: BUSES AND FACILITIES

LENGTH (miles / km)

OTHShare:

FUND: TRANSIT

PE: NONE

. 0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTHShare:

FUND: TRANSIT

PE: NONE

010.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTHShare:

$187,000 $150,000
$37,000
$505,000 $449,000
$56,000 $56,000
$8,273,000 $1,404,000 $6,869,000
$4,050,000 $3,600,000
$450,000 $450,000
$4,050,000 $3,600,000
$450,000 $450,000

Page 670/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
,-------.-...~-------""'

CHATHAM COUNTY

PROJECT: 505038- TYPE WORK: CAP~TAL

FUND: TRANSIT

PE:NONE

SAVANNAH TIP #

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: CAPITAL MAINTENANCE ITEMS; OFFICE EQUIP.; FACILITY MOD.;

CST: 2002

FED Share:

GA Share:

OTH Share:

$738,000 $656,000.
$82,000 $82,000

PROJECT: 505039- TYPE WORK: OPERATING

.SAVANNAH TIP #

LENGTH (miles / km)

DESCRPT: TRANSIT OPERATING ASSISTANCE FOR FY 2002

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

$8,438,000 $1,400,000

. PROJECT: 5V7023- TYPE WORK: CAPITAL

.SAVANNAH TIP #

LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

,.

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$7,038,000
$59,000 $59,000 $15,000

PROJECT: TOOOl61 TYPE WORK: CAPITAL

SAVANNAH TIP #

LENGTH(miles / km) .

DESCRPT: FY 2002 SAVANNAH SECTION 5310 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE.

CST: 2002

FED Share:

GA Share:

$62,000 $62,000 $16,000

PROJECT: TOOOI74 TYPE WORK: CAPITAL

SAVANNAH TIP #

LE,NGTH (miles / km)

DESCRPT: FY 2003 SAVANNAH SECTION 5309 CAPITAL

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share;'

GA Share:

OTH Share:

PROJECT: TOOOI77 TYPE WORK: CAPITAL

SAVANNAH TIP #

LENGTHJt;niles / km)

DESCRPT: FY 2003 SAVANNAH SECTION 5307 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

PROJECT: TOOOl78 TYPE WORK: CAPIT AL

SAVANNAH TIP #

. LENGTH (miles/ km) -

D.ESCRPT: FY 2003 SAVANNAH SECTION 5310 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$4,050,000 $3,600,000
$450,000 $450,000
$603,000 $536,000
$67,000 $67,000
$65,000 $65,000 $16,000

PROJECT: TOOOI94 TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

SAVANNAH TIP #

. LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: FY 2003 SAVANNAH SECTION 5307 CAPITAL

CST: 2003

$8,443,000

$". ~.

FED Share:

$1,400,000

'.

~-..:;)

OTH Shure:

$7,043,000

Page 68 of336

S TATE TRANSPORTATION IMPROVE"MENT PROGRAM
9/21/00

CHATHAM COUNTY

PROJECT: 1'000195 TYPE WORK: OPERATING

SAVANNAH TIP #

LENGTH (miles I km}

DESCRPT: FY 2001 SAVANNAH SECTION 3037 OPERATING

PROJECT: 1'000196 TYPE WORK: OPERATING

SAVANNAH TIP #

LENGTH (miles I km)

DESCRPT: FY 2002 SAVANNAH SECTION 3037 OPERATING

PROJECT: 1'000197 TYPE WORK: OPERATING

SAVANNAH TIP #

LENGTH (miles I km)

DESCRPT: FY 2003 SAVANNAH SECTION 3037 OPERATING

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW.- NONE

CST: 2002

FED Share:

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

OTHShare:

$1,500,000 $750,000 $750,000
$1,500,000 $750,000 $750,000
$1,500,000 $750,000 $750,000

.....;. ....

~.
Page 69 0/336

......-

' _.1....

STATE TRANSPORTATION IMPROVEMENT PROGRAM

, _ _._._ _

9/21/00 .
-

._"

_ _ "'1

. _ " ' . " " _ : _... _ - . . . .

CHATTAHOOCHEE COUNTY

PROJECT: 32216X- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 0/0.00 DESCRPT:. SR 1 FM CR 43/STEWART TO US 280/SEE STEWART CO- 322160

EXIST. LANES: 02 PROPOSED LANES: 04

ASSQCIATED PROJECTS: 322160-

PE:NONE ROW: NONE CST: NONE

~~ .
~:

Page 70 of336

_ - - - - - - - - - - - - - - - - - - , '--.,-_.. .. _--------------_._---
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

CHATTOOGA COUNTY

PROJECT: 0000 III TYPE WORK: HISTORIC PRESERVATION

FUND: STP

PE: LOCL

LENGTH (miles I km) 0 10.00

ROW: LOCL

DESCRPT: SUMMERVILLE-DOWDY PK TURNTABLE/DEPOT RESTORATION/PED WALKWY CST: 2001

FED Share:

OTH Share:

PROJECT: 0000677 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.2 10.32

DESCRPT: CR 87/PEACH ORCHARD ROAD @ ALPINE CREEK I MI SE OF MENLO

PE: 2001 ROW: LOCL CST:

$319,000 $255,000
$64,000 $21,000
AFTER 2003

PROJECT: 0000678 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

. LENGTH (miles I km) 0.2 10.32

DESCRPT: CR 318/HAIR LAKE ROAD @ CHELSEA CREEK 5 MI NE OF MENLO

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 0000679 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (mileslkm) 0.21/0,34

DESCRPT: CR 322/0LD HIGHWAY 337 @ CHELSEA CREEK 3.2 MI NE OF MENLO

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 0000846 TYPE WORK: REPLACE BRIDGE

FUND: FOREST HWY PE: 2001

LENGTH (miles I km) 0.2/0.32

ROW: NONE

DESCRPT: CR 325/FH 12/HAMMOND GAP ROAD @ RUFF CREEK NW OF SUBLIGNA

CST: 2003

FED Share:

$25,000
$159,000 $159,000

PROJECT: 621082- TYPE WORK: WIDENING

FUND: STATE

LENGTH (mileslkm) 8 I 12.88

DESCRPT: SR I/US27/SUMMERV'LE BYP FM CR 329 TO N OF CR325 @ SR I/US27

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 62Y082-

PE: 1993 ROW: 2001 CST:

UNDERWAY $2,180,000 AFTER 2003

PROJECT: 621610- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles I km) 11.7 I 18.84 .

DESCRPT: SR IIUS 27 FM CR 331 rrRION TO LAFA YETTE BYP & WALKER CO

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 62161X-

PE: 1992 ROW: 2001 CST:

UNDERWAY $5,861,000 AFTER 2003

~
t.e:

PROJECT: 642470- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles I km) 0.22/0.35

ROW: LOCL

DESCRPT: CR 332/BACK BERRYTON ROAD @RACCOON CREEK CENTER OF BERRYTON

CST: 2002

FED Share:

OTH Share:

UNDERWAY
$700,000 $560,000
$140,000

Page 71 of336

r--====================-=-:_-. :- -:_:.=. _=-=_=.=_=-=-=-=-=================~'----STATE TRANSPORTATI0{V IMPROVEMENT PROGRAM

.............. .-.

"....".,,"""""" "

,.-oQllI"'""""""..,.."""'''' _ _~_ _'

9/21/00 M

'_.

, _ ._ _...

_

CHEROKEE COUNTY

PROJECT: 0000135 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # CH AR BP041

LENGTH (miles / km)

DESCRPT: ETOWAH RIVER GREENWAYIBIKE-PED PATH'

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$900,000 $720,000

PROJECT: 0000615 TYPE WORK: SIDEWALKS

ATLANT A TMA TIP # CH AR BP032

LENGTH (miles / km)

DESCRPT: SR 20 SIDEWALKS FM 1-575 TO CHAMBLEE LANE

OTH Share:

FUND: CMAQ

PE: LOCL

0/0.00

ROW: LOCL

CST: 2002

FED Share:

$180,000
$164,000 $131,000

PROJECT: 0000616 TYPE WORK: BICYCLE/PED. FACILITY

ATLANT A TMA TIP # CH AR BP039

LENGTH (miles / km)

DESCRPT: OAKDALE RD BIKE/PED FN SR 20 TO HA YNES ROAD

OTH Share:

FUND: CMAQ 0/0.00

PE: LOCL 'ROW: LOCL
CST: 2002 FED Share:

$33,000
$60,000 $48,000

PROJECT: 0000617 TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # CH AR BP040

LENGTH (miles / km)

DESCRPT: DOWNTOWN CANTON STREETSCAPE & SIDEWALKS

OTH Share:

FUND: CMAQ

PE: LOCL

0/0.00

ROW: LOCL

CST: 2001

FED Share:

$12,000
$1,265,000 $1,012,000

OTH Share:

PROJECT: 610740- TYPE WORK: ATLANTA TMA TIP # CH AR 108 DESCRPT: 1-75 @ SR 92

INTERCHANGE LENGTH (miles / km)

FUND:NHS 0.65 /1.05

PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:

$253,000
UNDERWAY , $2,580,000
$4,885,000 $3,908,000
$977,000

PROJECT: 611250- TYPE WORK: TURN LANES

FUND: NHS

ATLANTA TMA TIP # CH AR 229

LENGTH (miles / km) 1.21/ 1.95

DESCRPT: 1-575 AUXILIARY LANES BETWEEN SR 92 AND TOWNE LAKE PARKWAY

PE:2001 ROW: 2003 CST:

.$80,000 $25,000 AFTER 2003

PROJECT: 611260- TYPE WORK: TURN LANES

ATLANT A TMA TIP # CH AR 230

LENGTH (miles / km)

DESCRPT: 1-575 AUX LANES BETWEEN SR 20 AND SR 5 BUSINESS

FUND:NHS 0.28 /0.45

PE: 2001 ROW: NONE CST: 2003 FED Share: GA Share:

$25,000
$1,000,000 $800,000 $200,000

PROJECT: 611270- TYPE WORK:. INTERCHANGE

ATLANTA TMA TIP # CH AR 231

LENGTH (miles / km)

DESCRPT: 1-575 AT SR 20 -INTERCHANGE RECONSTRUCTION

FUND:NHS 0.28 /0.45

PE:2001

ROW: 2002

,.

CST: 2003

FED Share:

GA Share:

$75,000 $500,000 $2,000,000 $1,600,000 . $400,000

Page 72 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
. 9/21/00
,------~----_~--- -~------

CHEROKEE COUNTY

PROJECT: 620920- TYPE WORK: WIDENING

FUND: NHS

ATLANTA TMA TIP # CH 003

LENGTH (miles 1 km) 2.83/4.56

DESCRPT: SR 92 FM W OF WADE GREEN ROAD EASTERLY TO CHEROKEE TRAIL

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 1999 CST: 2003 FED Share: GA Share:

UNDERWAY UNDERWAY $8,793,000 $7,034,400 $1,758,600

PROJECT: 620940- TYPE WORK: WIDENING

ATLANTA TMA TIP # CH 004

LENGTH (miles 1 km)

DESCRPT: SR 92 FM 1-75 TO WADE GREEN ROAD

EXIST. LANES: 02 PROPOSED LANES: 04

FUND: NHS 4.5/7.25

PE: 1995 ROW: 2001 CST:

UNDERWAY $6,450,000 AFTER 2003

PROJECT: 630975- TYPE WORK: WIDENING

FUND: BRIDGE

PE: 1993

ATLANTA TMA TIP # CH 0 18

LENGTH (miles 1 km) 0.63 11.0 I

ROW: LOCL

DESCRPT: CR 770/BELLS FERRY RD FM NO VICTORIA TO.2 MI N/LITTLE RVR

'CST: 2003

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

GA Share:

UNDERWAY
$5,260,000 $4,208,000 $1,052,000

PROJECT: 631210- TYPE WORK: REALIGNMENT

FUND: STP

ATLANTA TMA TIP# CH 187

LENGTH (mileslkm) 5.23/8.42

DESCRPT: CR 772/KELLOG CRK RD FM SR 92 TO BELLS FERRY RD



PE: 2002 ROW: LOCL CST:

$197,000 AFTER 2003

PROJECT: 632790- TYPE WORK: PASSING LANES

FUND: MIN. GUARAN PE: 1999

ATLANTA TMA TIP # CH 182

LENGTH (miles 1 km) 4.917.89

ROW: 2001

DESCRPT: SR 20 3 TRUCK CLIMBING LANES AND INT IMP FM 1-575 TO CR 238

CST: 2002

FED Share:

GA Share:

UNDERWAY $4,374,000 $5,826,000 $4,660,800 $1,165,200

PROJECT: 632840- TYPE WORK: TURN LANES

FUND: STP

ATLANTA TMA TIP # CH 197

LENGTH (miles 1 km) 1.7 12.74

DESCRPT: SR 140 FM ARNOLD MILL RD/CR 777 TO MOUNTAIN RD/CR 311

PE: 1999 ROW: 2003 CST: 2003 FED Share: GA Share:

UNDERWAY $115,000
$1,965,000 $1,572,000
$393,000

PROJECT: 632845- TYPE WORK: TURN LANES

ATLANTA TMA TIP # CH 196

LENGTH (miles 1 km)

DESCRPT: SR 140 @ SUGAR PIKE RD/CR 296

FUND: STP 0.2 10.32

PE: 1999 ROW: 2003 CST: 2003 FED Share: GA Share:

UNDERWAY $20,000
$246,000 $196,800
$49,200

~
.;....
~.s>

PROJECT: 632850- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # CH 195

LENGTH (miles / km) 0.2 10.32

DESCRPT: SR 140@HICKORY ROADICR 778 & BATESVILLE ROAD/CR 298

PE: 1999 ROW: 2003 CST: 2003 FED Share: GA Share:

UNDERWAY $26,000
$217,000 $173,600
$43,400

Page 73 of336

_ _,

STATE TRANSPORTATION IMPROVEMENT PROGRAM

. . . ~.$

... , _.. , . . .

9/21/00

.._ _ _ _:... ,._~>;''''''',_.:'1

~

....''''_._ _ ... ."............... ~

,..,_,,_~_'''''<

<.

CHEROKEE COUNTY

PROJECT: 632855- TYPE WORK: TURN LANES

FUND: STP

ATLANTA TMA TIP # CH 194

LENGTH (miles I km) 0.4 10.64

DESCRPT: SR 140 AT MAULDIN ROAD/CR 323 AND UNIVETER ROAD/CR 309

PE: 1999 ROW: 2003 CST: 2003 FED Share: GA Share:

UNDERWAY $47,000
$310,000 $248,000
$62,000

PROJECT: 632860- TYPE WORK: TURN LANES.

ATLANTA TMA TIP # CH 198

LENGTH (miles I km)

DESCRPT: SR 140 AT SCOTT ROAD/CR 288

FUND: STP 0.2 10.32

PE: 1999 ROW: 2003 CST: 2003 FED Share: GA Share:

UNDERWAY $21,000
$258,000 $206,400 $51,600

PROJECT: 642485- TYPE WORK: . INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # CH 200

LENGTH (miles I km) 0.2 10.32

DESCRPT: SR 140; REALIGN HOSPITAL RD & SHOAL CK RD IN CITY OF CANTON

PE: LOCL ROW: 2001 CST: 2001 FED Share:

OTH Share:

PROJECT: 642490- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # CH AR BP035

LENGTH (miles I km) 1.5/2.42

DESCRPT: SR 5 BUS MULT-USE TRAIL FM JUNIPER ST TO BOLING PK IN CANTON

PE:LOCL ROW: LOCL CST: 2001 . FED Share:

PROJECT: 642495- 'TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # CH AR BP021

LENGTH (miles I km)

0 10.00

DESCRPT: JOHN T PETIT MULTI-USE TRAIL &DRAINAGE;LN WIDENING IN CANTON

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 662610- TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # CH AR BPO18 .

LENGTH (miles I km)

DESCRPT: TOWNE LAKE PKWY/CR 416 FM 1~575 TO EAGLE DR

FUND: STP 0/0.00

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 662612- TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # CH AR BP020

LENGTH (miles I km)

DESCRPT: WADE GREEN RD FM HWY 92 TO COBB CO LINE

FUND: STP 0/0.00

OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 662614- TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # CH AR BPO15

LENGTH (miles I km)

DESCRPT: TOWNE LAKE PKWY FM BELLS FERRY RD TO EAGLE DR

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 . FED Share:

OTH Share:

$300,000 $565,000 $452,000 $113,000
$160,000 $128,000
,0
$32,000
$144,000 $115,000
$29,000
$185,000 $148,000
$37,000
$84,000 $67,000 $17,000
$173,000 $138,000
$35,000

Page 74 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
._._---- __ '--_.~,_. --- 9/21/00---------------_.,----

CHEROKEE COUNTY

PROJECT: 662615- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # CH AR BP037

LENGTH (miles I km) I.5 12.42

DESCRPT: SUNSET/IVY DRS FM MARIETTA TO MCCOLLUM IN CANTON

PE:LOCL ROW: LOCL CST: 2001 FED Share:

$275,000 $220,000

PROJECT: 662616- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANT A TMA TIP # CH AR BP038

LENGTH (miles I km) 0.9 I 1.45

DESCRPT: MERIDAN ST IN CANTON: BIKE/PED LN W/L1GHTING & SIGNAGE

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$55,000
$150,000 $120,000

PROJECT: 662617- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # CH AR BP034

LENGTH (miles I km) 2 13.22

DESCRPT: MEDICAL DISTRICT IN CANTON:HOSP RD@SRI40tO HOSP DR@SR5BU

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$30,000
$800,000 $640,000 .

PROJECT: 662618- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # CH AR BP036

LENGTH (miles I km) 010.00

DESCRPT: PED BRIDGE FM W OF CANTON MILL LOFTS TO SR 5 BUS TO JUNIPER

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

$160,000
$750,000 $600,000

OTH Share:

$150,000

" '.

PROJECT: 662620- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

PE: 1999

UNDERWAY

ATLANTATMATIP#CHI81

LENGTH (mileslkm) 3.67/5.91

ROW: LOCL

DESCRPT: OLD SR 5 FM WOODSTOCK CL TO HOLLY SPRINGS CL

CST: 2002

$2,500,000

FED Share:

$2,000,000

OTH Share:

PROJECT: 671951- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # CH 199

LENGTH (miles I km) 0.21 10.34

ROW: LOCL

DESCRPT: CR 107/HOWELL BRIDGE RD @ SHARP MTN CREEK SW OF BALL GROUND

CST: 2002

FED Share:

GA Share:

$500,000
UNDERWAY
$597,000 $477,600 $119,400

PROJECT: 6V7025- TYPE WORK: CAPITAL LENGTH (miles I km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE: NONE

010.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$17,000 $17,000 $4,000

PROJECT: 71364X- TYPE WORK: WIDENING

FUND:NHS

ATLANT A TMA TIP # AR 3 I8B

LENGTH (miles I km) 0 10.00

DESCRPT: 1-575 FM 1-75 NORTH TO SIXES ROAD/CHEROKEE-HOV- SEE COBB

EXIST. LANES: 04 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 713640-

,PE:NONE ROW: NONE CST: NONE

o
Page 75 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

__ _--"._:- _----,...,..-,- 9/21/00

"' ~_._--- ----_._~_._-------~,........,-""'-~ ... ~

'" ...... .

..

CHEROKEE COUNTY

PROJECT: 71409X TYPE WORK: ATMSIITS

FUND: CMAQ

A.TLANTA TMA TIP # AR 341

LENGTH (miles I km) 0 10.00

. DESCRPT: ATMS/I-575 COMM/SURV FM I751COBB TO SR 92.ICOBB-7I4090

I
PE:NONE
ROW: NONE
CST: NONE

ASSOCIATED PROJECTS: 714090

PROJECT: TOOOOOI TYPE WORK: CAPITAL

ATLANTA TMA TIP # CH 152D

LENGTH (miles I km)

DESCRPT: FY 2002 CHE~OKEE COUNTY SECTION 5310

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FEDS!zare:

GA Share:

$17,000 . $17,000
$4,000

PROJECT: T000020 TYPE WORK: CAPITAL

ATLANT A TMA TIP # CH 152D

LENGTH (miles I km)

DESCRPT: FY 2003 CHEROKEE COUNTY SECTION 5310

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

,

CST: 2003

FED Share:

GA Share:

$18,000 $18,000
$5,000

<{
~
[-:':.,:..:;'

Page 76 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM

_~

j"_"l"'

=

"'''_''_'''-_~'_,

n _ _ ",,~

9/21/00

... _ < " "

_

CLARKE COUNTY

PROJECT: 0000159 TYPE WORK: SIDEWALKS

FUND: STP

PE:LOCL

ATHENS TIP #

LENGTH (miles I km) 0 10.00

ROW: LOCL

DESCRPT: ATHENS-CLARKE CO/WHITEHEAD & OGLETHORPE ELEMENTARYIPED IMP

CST: 2001

FED Share:

'PROJECT: 0000160 TYPE WORK: BICYCLE/PED. FACILITY

ATHENS TIP #

LENGTH (miles I km)

DESCRPT: ATHENS-CLARKE CO/RIVER BEND ROAD BIKE LANES

FUND: STP 010.00

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 0000161 TYPE WORK:, BICYCLE/PED. FACILITY

FUND: STP

ATHENS TIP #

LENGTH (miles I km) 0 10.00

DESCRPT: ATHENS-CLARKE CO/MULTI-USE BRIDGES OVER TRAIL & SANDY CREEKS

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000162 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATHENS TIP #

LENGTH (mileslkm) 0/0:00

DESCRPT: ATHENS-CLARKE CO/THE UNIVERSITY OF GEORGIA RIVER TRAIL PH II

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 122160- TYPE WORK: . WIDENING

FUND: STP

ATHENS TIP # 11-01(2)

LENGTH (miles I km) 4 16.44

DESCRPT: SR 15 ALT/US i 29 FM LAVENDER DR/CLARKE TO SR 330/JACKSON

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 12216X- .

OTH Share:
PE: 1992 ROW: 2001 CST: 2001 FED Share: GA Share:

$225,000 $180,000 $45,000
$303,000 $242,000
$61,000
$361,000 $289,000 $72,000
$365,OQO $292,000 $73,000 UNDERWAY $3,054,000 $8,950,000 $7,160,000 $1,790,000

PROJECT: 122600- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATHENS TIP # 11-04

LENGTH (miles I km) 0.5 10.81

DESCRPT: SR 10 LOOP/ATHENS PERIMETER AT US 78/LEXINGTON RD

EXIST. LANES: 00 PROPOSED LANES: 02

PE: 1994 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $495,000 $712,000 $569,600 $142,400

PROJECT: 122850- TYPE WORK: INTERCHANGE

FUND:NHS

ATHENS TIP # 11-09

LENGTH (mileslkm) 0.2/0.32

DESCRPT: SR 10 LOOP/ATHENS PERIMETER AT PETER ST/CS 306 & OLYMPIC DR

EXIST. LANES: 00 PROPOSED LANES: 02

PE: 1998 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $500,000
$10,500,000 $8,400,000 $2,100,000

{:
l;.:

PROJECT: 142200- TYPE WORK: INTERSECTION IMPROVEMENT

ATHENS TIP # 11-14

LENGTH (miles I km)

DESCRPT: WINTERVILLE RD/CR 470 AT NELLIE B. AVE/CR 141

FUND: STP 0.2 10.32

PE:2000 ROW: LOCL CST: 2001 FED Share:
OTH Share:

UNDERWAY
$355,000 $284,000
$71,000

, Page 77 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

---'...-----_._,--~

_ _ _",....- ..__. _.9_/.2_1/_ 00

_ _'

'""~

'_"__'_Il''"'_ _,

CLARKE COUNTY

PROJECT: 142205- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATHENS TIP # 11-15

.LENGTH [miles I km) 0.35 10.56

DESCRPT: WINTERVILLE RD/CR 470 AT INDIAN HILLS & SPRING VALLEY-REALGN

PE: 2000 ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 142210- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATHENS TIP # 11-16

LE,NGTH (miles! km) 0.28/0.45

DESCRPT: SPRING VALLEY RD/CR 140 AT ATHENA DR AND MOSS RD-REALIGNMENT

PE: 2000 ROW: LOCL CST: 2001 FED Share:

PROJECT: 142230- TYPE WORK: WIDENING

FUND: STP

ATHENS TIP # 11-02

LENGTH (mileslkm) 2.4 13.86

DESCRPT: OLD HULL RD/CR 127 FM NORTH AVE TO HULL RD/SR 72(EXCEPTION)

EXIST. LANES: 02 PROPOSED LANES: 03

OTHShare:
PE: 1999 ROW: LOCL CST: 2003 FED Share:

PROJECT: 142235- TYPE WORK: INTERSECTION IMPROVEMENT , FUND: STP

ATHENS TIP # 11- I9 I

LENGTH [miles I km) 0.25 10.40

DESCRPT: HAWTHORNE AVE/CR 811 AT OLD WEST BROAD STICR 938

OTHShare:
PE: 2000 ROW: LOCL CST: 2003 FED Share:

OTHShare:

PROJECT: 170522- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

ATHENSTIP#IV-05

. LENGTH(mileslkm) 0.47/0.76

ROW: LOCL

DESCRPT: CR 119/NO~HERE ROAD @ EAST SANDY CREEK 4 MI NORTH OF ATHENS

CST: 2001

FED Share:

OTHShare:

PROJECT: \D1071- TYPE WORK: CAPITAL

ATHENS TIP #

LENGTH (miles / km:

DESCRPT: TRANSIT VEHICLE

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTHShare:

PROJECT: \DI072- TYPE WORK: CAPITAL

ATHENS TIP # .

LENGTH (miles I km) .

DESCRPT: TRANSIT VEHICLES; MANINTENANCE AND EQUIP.

FUND: TRANSIT

PE: N01'!E

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTH Share:

PROJECT: \DI073- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

ATHENS TIP #

LENGTH(mileslkm) 0/0.00

ROW: NONE

DESCRPT: PUBLIC TRANSIT SERVICE IN ATHENS AND C;..ARKE COUNTY

CST: 2001

FED Share:

OTHShare:



_

UNDERWAY
$798,000 $638,000
$160,000 UNDERWAY
$354,000 $283,000
$71,000 UNDERWAY
$1,750,000 $1,400,000
$350,000 UNDERWAY
$420,000 $336,000
$84,000 UNDERWAY
$1,174,000 $939,000
$235,000

$450,000 $400,000
$50,000 $50,000

$411,000 . $365,000
$46,000 $46,000

$2,454,000 $455,000
$1,999,000

Page 78 of336.

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_~_~_________

..c: ...~""""'_

9/21/00

.... ~ ..

_~l.1Il

CLARKE COUNTY

PROJECT: 1DI074- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

ATHENS Tip #

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: TRANSIT VEHICLE; MULTI-MODAL TRANSPORTATION CENTER

CST: 2002

FED Share:

GA Share:

OTH Share:

PROJECT: 1D1075- TYPE WORK: CAPITAL

ATHENS TIP #

LENGTH (miles / km)

DESCRPT: TRANSIT VEHICLES; MAINTENANCE AND EQUIP.

FUND: TRANSIT

PE:NONE

0/0.00.

ROW.' NONE

CST: 2002

FED Share:

GA Share:

OTH Share:

PROJECT: 1DI076- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

ATHENS TIP #

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: PUBLIC TRANSIT SERVICE IN ATHENS AND CLARKE COUNTY

CST: 2002

FED Share:

PROJECT: IV7027- TYPE WORK: CAPITAL

ATHENS TIP #

LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

PROJECT: TOOOl14 TYPE WORK: CAPITAL

ATHENS TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 ATHENS SECTION 5307 CAPITAL

PROJECT: TOOOl15 TYPE WORK: CAPITAL

ATHENS TIP #

LENGTH (miles./ km)

DESCRPT: FY 2003 ATHENS SECTION 5309 CAPITAL

PROJECT: TOOOl16 TYPE WORK: CAPITAL

ATHENS TIP #

LENGTH (miles /km)

DESCRPT: FY 2003 ATHENS SECTION 5310 CAPITAL

OTH Share:

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTH Share:

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Shure:

OTH Share:

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$1,554,000 $1,381,000
$173,000 $173,000
$609,000 $541,000
$68,000 $68,000
$2,454,000 $455,000
$1,999,000
$18,000 $16,000
$2,000 $2,000
$673,000 $598,000
$75,000 $75,000
$450,000 $400,000
$50,000 $50,000
$18,000 $18,000
$5,000

~~: ~;i;~

PROJECT: TOOOl17 TYPE WORK: OPERATING

ATHENS TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 ATHENS SECTION 5307 OPERATING

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

OTH Share:

$2,503,000 $464,000
$2,039,000

Page 79 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
. - - - - , - - - - 9/21/00 , - - - - - - - - - - - - _ . _ - - - -

CLARKE COUNTY

PROJECT: TOOO)54 TYPE WORK: CAPITAL

ATHENS TIP #

LENGTH (miles / km)

DESCRPT: FY 200 I ATHENS SECTION 53) 0 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 200)

FED Share:

GA Share:

$)7,000 $)7,000
$4,000

PROJECT: TOOO)55 TYPE WORK: CAPITAL

ATHENS TIP #

LENGTH (miles / km)

DESCRPT: FY 2002 ATHENS SECTION 5310 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$)8,000 $)8,000
$4,000

<!S": ':.-
tj:

,. Page 80 of336

~ I

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_

_

~

,------_._-------,.. - ' - - - .. ~.=_"' ~oo;_ _

9/21/00

-.. -~..

CLAY COUNTY

PROJECT: 422230- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km)7.44 / I 1.98

DESCRPT: SR 1 FM BLUFFTON BYP TO CA.RNEGIE VILULAH RD/CR 153/RANDOLPH

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 42223X- 42Y230-

PE: 1993 ROW: 2001 CST: 2003
GA Share:

UNDERWAY $1,119,000 $ 11,762,000
$ 11,762,000

Page 81 of336

'------ __ '-_.''''--,-.-; - STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

.. ........,,"''''--,~''' _-;.,'-~_.

........

....._-----~_.-_._.,,.. ....

CLAYTON COUNTY

PROJECT: 0000090 TYPE WORK: SIDEW ALKS

ATLANTA TMA TIP # CL AR BP238

LENGTH (miles / km)

DESCRPT: FOREST PARK SIDEWALKS & LANDSCAPING

FUND:STP 0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share: .

$1,126,000 $901,000

OTH Share:

PROJECT: 0000340 TYPE WORK: CAPITAL

FUND: CMAQ

PE:LOCL

ATLANTA TMA TIP # CL AR 238A

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: CLAYTON COUNTY PUBLIC TRANSPORTATION SYSTEM - PHASE I

CST: 2001

FED Share:

$225,000
$5,000,000 $4,000,000

PROJECT: 0000375 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: 1M

ATLANTATMATIP#ARI30P

LENGTH (miles/km) 0/0.00

DESCRPT: 1-285/1-75 INTERMEDIATE SOLUTION TO REDUCE TRUCK OVERTURNING

OTH Share:
PE: 2000 ROW: NONE CST: 2001 FED Share: GA Share:

$1,000,000
UNDERWAY
$1,500,000 $1,350,000
$150,000

PROJECT: 0000541 TYPE WORK: SIGNALS

FUND: STP

ATLANTA TMA TIP # AR l30H

LENGTH (miles / km) 0/0.00

DESCRPT: SR 3/SR 154 INSTALL TRAFFIC SIGNAL LOOPS @ VARIOUS LOCATIONS

LUMP SUM PROJECT

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$76,000 $60,800 $15,200

PROJECT: 0000564 TYPE WORK: REALIGNMENT

FUND: STP

ATLANTA TMA TIP Ii CL AR 230

LENGTH (miles / km) 1.75 /2.82

DESCRPT: LOOP ROAD REALIGNMENT FM LAKE MIRROR RD TO RIVERDALE RD

PE:LOCL ROW: LOCL CST: 2003 FED Share:

PROJECT: 0000618 TYPE WORK: VEHICLE PURCHASES

ATLANTA TMA TIP # CL AR 238B

LENGTH (miles / km)

DESCRPT: CLAYTON COUNTY CNG BUS PURCHASE: PHASE 2

OTH Share:

FUND: CMAQ

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

PROJECT: 0000619 TYPE WORK: VEHICLE PURCHASES

ATLANTA TMA TIP # CL AR 238C

LENGTH (miles / km)

DESCRPT: CLAYTON COUNTY CNG BUS PURCHASE: PHASE 3

OTH Share:

FUND: CMAQ 0/0.00

PE: NONE ROW: NONE CST: 2003 FED Share:

OTH Share:

PROJECT: 0000620 TYPE WORK: OPERATING

FUND: CMAQ

PE:NONE

ATLANTA TMA TIP # CL AR 239A

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: CLAYTON COUNTY BUS SYSTEM OPERATING ASSISTANCE: PHASE I

CST: 2002

FED Share:

OTH Share:

$5,000,000 $4,000,000 $1,000,000
$4,860,000 $3,888,000
$972,000
$3,240,000 $2,592,000
$648,000
$5,000,000 $4,000,000 $1,000,000

Page 81 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
-----_..._.,.-..---,91-21-10-0 _.--,._,-----... _._-__----_.

CLAYTON COUNTY

PROJECT: 0000621 TYPE WORK: SIDEWALKS

ATLANT A TMA TIP # CL AR BP004

LENGTH (miles / km)

DESCRPT: RIVERDALE SIDEWALKS TO SCHOOLS

FUND: CMAQ 0/0.00

PE: LOCL ROW: LOCL CST: 2003 FEDSllare:

$1,250,000 $1,000,000

PROJECT: 0000622 TYPE WORK: SIDEWALKS

ATLANT A TMA TIP # CL AR BP239

LENGTH (miles / km)

DESCRPT: FOREST PARK SIDEWALKS TO SCHOOLS - PHASE I

OTH Share:

FUND: CMAQ 0/0.00

PE: LOCL ROW: LOCL CST: 2003 FED Shure:

$250,000
$1,875,000 $1.500,000

PROJECT: 0000623 TYPE WORK: SIDEWALKS

ATLANT A TMA TIP # CL AR BP240

LENGTH (miles / km)

DESCRPT: FOREST PARK SIDEWALKS TO SCHOOLS - PHASE 2

OTH Share:

FUND:CMAQ

PE:LOCL

0/0.00

ROW: LOCL

CST: 2003

FED Share:

$375,000
$1,000,000 $800,000

OTH Share:

PROJECT: 0000646 TYPE WORK: OPERATING

FUND: CMAQ,

PE:NONE

ATLANT A TMA TIP # CL AR 239B

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: CLAYTON COUNTY BUS SYSTEM OPERATING ASSISTANCE: PHASE 2

CST: 2003

FED Share:

$200,000
$4,000,000 $3,200,000

PROJECT: 0000674 TYPE WORK: ATMS/ITS

ATLANTA TMA TIP # CL 224B

LENGTH (miles / km)

DESCRPT: ATMS: CLAYTON ATMS ENHANCEMENT - PHASE 2

OTH Share:

FUND: CMAQ 0/0.00

PE: LOCL ROW: LOCL CST: 2002 FEDShclTe:

$800,000
$785,000 $628,000

OTHShare:

PROJECT: 712602- TYPE WORK: BRIDGES

ATLANTA TMA TIP # CL 059

LENGTH (miles / km)

DESCRPT: LEE STREET IN MORROW OVER 1-75

EXIST. LANES: 00 PROPOSED LANES: 02

ASSOCIATED PROJECTS: 712630-

FUND:NHS 0.08/0.13

PE: 1992 ROW: LOCL CST: 2003 FED Share: GA Share:

$157,000 .
UNDERWAY
$1,076,000 $860,800 $215,200

PROJECT: 712630- TYPE WORK: INTERCHANGE

FUND: NHS

ATLANTA TMA TIP # CL AR 031

LENGTH (miles/km) 2.4 /3.86

DESCRPT: 1-75 FM MT ZION BLVD TO OLD DIXIE(BRIDGES)& SR 54 INTERCH

.ASSOCIATED PROJECTS: 712602-

PE: 1992 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $920,000
$15,139,000 $12,111,200
$3,027,800

.
;~
~'.':...:. ~>

PROJECT: 713210- TYPE WORK: RAMP

ATLANTA TMA TIP # CL AR 179

LENGTH (miles / km)

DESCRPT: 1-285 EAST TO 1-75 SOUTH RAMP ALIGNMENT

FUND: 1M 1.4712.37

PE: 1995 ROW: 2001 CST:

UNDERWAY $680,000
AFTER 2003

Page 83 of336

-,
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

CLAYTON COUNTY

PROJECT: 71337W- TYPE WORK: A T M S I I T S F U N D : C M A Q .

ATLANTA TMATIP # DK AR 2 I 4

LENGTH (miles / km) 0/0.00

DESCRPT: ATMS/I-285 SURVEIL FM I-75ICLAYTON NE THRU FULTN TO I-20/DEK
v,

ASSOCIATED PROJECTS: 7 I3373-

PE:NONE ROW: NONE CST: NONE

PROJECT: 713880- TYPE WORK: INTERCHANGE

FUND:NHS

ATLANTA TMA TIP # CL AR 223A

LENGTH (miles / km) 1.2/ 1.93

DESCRPT: 1-75 NEW INTERCHANGE BETWEEN SR 54 & OLD DIXIE HWY & CD SYS

PE:,2002 ROW: CST:

$750,000 AFTER 2003 AFTER 2003

PROJECT: 714070- TYPE WORK: ATMS/ITS I

FUND: CMAQ

PE:NONE

ATLANTA TMA TIP # AR 282

LENGTH (miles / km) 3.53/5.'68

ROW: NONE

DESCRPT: ATMS/I-75 SURVEILLANCE DEVICES FM TARA BLVD TO 1-285

CST: 2001

FED Share:

GA Share:

$1,784,000 $1,427,200
$356,800

PROJECT: 714075- TYPE WORK: ATMS/ITS

FUND:NHS

ATLANT A TMA TIP # AR 307

LENGTH (miles / km) 10.5 / 16.89

DESCRPT: ATMSII-75 COMM/SURVEIL FM HUDSON BR RDIHENRY TO TA~ BLVD

ASSOCIATED PROJECTS: 71407X-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$9,132,000 $7,305,600 $1,826,400

PROJECT: 714200- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # AR 157

LENGTH (miles / km) 0.3 /0.48

DESCRPT: 1-75 SOUTHBOUND EXIT RAMP TO AND WEST ALONG MT ZION BLVD

LUMP SUM PROJECT

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
.$64,600 . $57,600
$6,400

PROJECT: 721480- TYPE WORK: WIDENING

FUND:NHS

ATLANTA TMA TIP # CL 031

LENGTH (miles/km) 3.9/6.28

DESCRPT: SR 138 FM WALT STEPHENS RD EAST TO 1-75/HENRY CO & 72148X

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 72148X- 72R480-

PE:1992 ROW: 1997 CST: 2002 FED Share: GA Share:

UNDERWAY UNDERWAY $6,485,000 $5,188,000 $1,297,000

PROJECT: 731520- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

ATLANTA TMA TIP # CL 095

LENGTH (miles / km) 0.42 /0.68

. ROW: 2001

DESCRPT:, SR 3/US 19 @ CEN OF GA RAILROAD .35 MI S OF JCT 1-285

CST: 2002

FED Share:

GA Share:

UNDERWAY $391,000
$3,500,000 $2,800,000 , $700,000

PROJECT: 731885- TYPE WORK: SIGNALS

FUND: STP

ATLANTA TMA TIP # CL 235

LENGTH (miles / km) 0/0.00

DESCRPT: SR 85 FM SR331 TO POINTE SOUTH PKWY & SRI38 FM SR85 TO NAVE

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$657,000 $525,600 $131,400

Page 84 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

---_._-'""'------- --..---_._-- __.. .~.~--....~---....-:---_:

9/21/00
~-,-"'---"--------

...

CLAYTONCOUNTY

i

PROJECT: 742870- TYPE WORK: WIDENIN.G

FUND: STP

ATLANTA TMA TIP # CL IOI

LENGTH (miles/ km) 5.7319.23

DESCRPT: SR 920 FROM SR 54 TO SR 3/US 19 {REL SR 81 J& FAYETTE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 74287X-

PE: 2003 ROW: CST:

$1,250,000 AFTER 2003 AFTER 2003

PROJECT: 751810- TYPE WORK: WIDENING

ATLANTA TMA TIP # CL 020

LENGTH (miles I km)

DESCRPT: FLINT RIVER RD FM WEBB DR TO TARA BLVD

EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 2.82 14.54

PE: 2001 ROW: LOCL CST:

$10,000 AFTER 2003

PROJECT: 752180- TYPE WORK: WIDENING

FUND: STP

ATLANTATMATIP#CL074

LENGTH (mileslkm) 1.712.74

DESCRPT: CONLEY RD (AVIATION BLVD EXT) FM OLD DIXIE HWY/SR 3 TO SR 54

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2001 ROW: LOCL CST:

$5 I ,000 AFTER 2003

PROJECT: 753010- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # CL 234

LENGTH (miles I km) 0.2 I 10.34

ROW: LOCL

DESCRPT: CR 1351/REX ROAD @LITTLE COTTON INDIAN CREEK IN REX

CST: 2002

FED Share:

GA Share:

:.:'

...;..:... ....

PROJECT: 762609- TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # CL AR BP092

LENGTH (miles I km) 5.6/9.02

ROW: LOCL

DESCRPT: FOREST PARK ALONG US 19/41; SR 54; SR 160 & SR 331

CST: 2001

FED Share:

UNDERWAY $1,645,000 $1,316,000
$329,000
$625,000 $500,000

PROJECT: 77120X- TYPE WORK: BRIDGE PAINTING

FUND: STP

ATLANTATMATIP#ARI3ID

LENGTH (miles r km) 010.00

DESCRPT: BRIDGE PAINTING IN COBB & CLAYTON COUNTIES177I 2051Y20.5

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 771205-

OTHShare:
PE:NONE ROW: NONE CST: NONE

$125,000

PROJECT: 771226- TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # CL AR BP022B

LENGTH (miles I km)

DESCRPT: JESTERS CREEK GREENWAY PHASE II

PROJECT: 7V704 I- TYPE WORK: CAPITAL

ATLANTA TMA TIP # CL 233D

LENGTH (miles I km)

. ,.~._",
~
~G>

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: STP 010.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

FUND: TRANSIT

PE: NONE

010.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$1,250,000 $1,000,000
$250,000
$26,000 $26,000 $7,000

Page 85 of336

----

STATE,~~rr~l',~l.lJ:A,TJ(JNIMl'1f;()VEMENr~~OGRAM

""'~---~

9/21/00
_ _ w
___.._~

, _---:

_

CLAYTON COUNTY

PROJECT: M000522 TYPE WORK: RESURFACE & MAINTENANCE

FUND: 1M

ATLANTA TMA TJP # AR I30P

LENGTH (miles /km) 5.21 /8.39

DESCRPT: SR 403/1-85 FM S OF RIVERDALE RD TO BR OVER S:TEWA"RT AVE

LUMP SUM PROJECT'

PE:,NONE ROW: NONE CST: 2001 FED Share: GA Share:

$1,271,000 $1,016,800
$254,200

PROJECT: T000002 TYPE WORK: CAPITAL

ATLANTA TMA TIP # CL 2330

LENGTH (miles / km)

DESCRPT: FY 2002 CLAYTON COUNTY SECTION 53 IO

FUND: TRANSIT 0/0.00

. . PE:NONE .
ROW: NONE

CST: 2002

FE.D,Share:

GA Share:

$28,000 $28,000
$7,000

PROJECT: T000021 TYPE WORK: CAPITAL

ATLANT A TMA TIP # CL 233D

LENGTH (miles / km)

DESCRPT: FY 2003 CLAYTON COUNTY SECTION 5310

FUND: TRANSIT . PE: NONE

0/0.00

ROW: NONE

CST: 2003

. FED Share:

GA Share:

$29,000 $29,000 $7,000

PROJECT: T000037 TYPE WORK: CAPITAL

ATLANT A TMA TIP # CL AR 238E

LENGTH (miles / km)

DESCRPT: FY 2001 CLAYTON COUNTY CAPITAL SECTION 5307

PROJECT: T000038 TYPE WORK: CAPITAL

ATLANTA TMA TIP # CL AR 238E

LENGTH (miles / km)

DESCRPT: FY 2002 CLAYTON COUNTY CAPITAL SECTION 5307

PROJECT: T000039 TYPE WORK: CAPITAL

ATLANTA TMA TIP # CL AR 238E

LENGTH (mileslkm)

DESCRPT: FY 2003 CLAYTON COUNTY CAPITAL SECTION 5307

FUND: TRANSIT

PE:NONE

0/,0.00

ROW: NONE

CST: 2001

'FED Share:

GA Share:

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTHShare:

$2,700,000 $2,400,000
$300,000 $300,000
$1,170,000 $1,040,000
$130,000 $130,000
, $720,000 $640,000
$80,000 $80,000

:;... " ~> r.
~;>

Page 86 of336

STATE TRANSPORTATIONIMPROVEMENT PROGRAM

- - ----------_._-~,_.

9/21/00

CLINCH COUNTY

PROJECT: 422030- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 2.4 /3.86

DESCRPT: SR 38/US 84 AND SR 89/US 441 WIDENING THROUGH HOMERVILLE

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 1999 CST: 2003
GA Share:

UNDERWAY UNDERWAY
$4,558,000
$4,558,000

PROJECT: 422055- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1992

LENGTH (miles / km) 0.6 / 0.97

ROW: NONE

DESCRPT: SR 38/US 84 @SUWANNOOCHEECREEK; ALAPAHA RVR & OVERFLOW

CST: 2001

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 422050-

GA Share:

UNDERWAY
$5,000,000 $4,000,000 $1,000,000

PROJECT: 42205X- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 0/0.00

DESCRPT: SR 38/US 84 FM W/ALAPAHA RVRlLOWNDES TO DUPONT/SEE LANIER

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 422050-

PE:NONE ROW: NONE CST: NONE

PROJECT: 422060- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 7.4 / 11.91

DESCRPT: SR 38/US 84 FM CR 207/DUPONT TO WEST CLiHOMERVILLE

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 . ROW: 1997 CST: 2001
GA Share:

UNDERWAY UNDERWAY $9,756,000
$9,756,000

PROJECT: 422120- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 11.8/19.00

DESCRPT: SR 38 FM WEST OF WOODYARD CK TO W OF GREASY CK 142212X

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 42212X- 422125- 42Y120-

PE: 1994 ROW: 2001 CST:

UNDERWAY $2,862,000 AFTER 2003

PROJECT: 42Y 400- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 89IUS 441 FM CR 8 FARGO TO CR 40/204 - FOR FED PE; 422400

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 422400-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 42Y410- TYPE WORK: WIDENING

FUND:NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 89/US 441 FM CR 40/204 TO SHIRLEY RD - FOR FED PE; 422410

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 422410-

PE: 2001 ROW: NONE CST: NONE

$1,000

: !!"
. Page87of336

--_..._ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
STATE TRANSPORTATION IMPROVEMENT PROGRAM

,.-...- ..........

..._. .....

........_ _,, ..- - . . .

, - ~ "_.~

9/21/00

"._

._._4101

....,_ _

COBB COUNTY

PROJECT: 0000102 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # CO AR BP204

LENGTH (miles / km)

DESCRPT: SMYRNA - SPRING ROAD LINEAR PARK

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000555 TYPE WORK: TURN LANES

ATLANTA TMA TIP # CO 313

LENGTH (miles / km)

DESCRPT: CHASTAIN RD @ BELLS FERRY RD/CR 2845

FUND: STP 0.2/0.32

OTHShare:
PE: 2002 ROW: LOCL CST: 2003 FED Share:

PROJECT: 0000556 TYPE WORK: TURN LANES

ATLANTA TMA TIP # CO 314

LENGTH (miles / km)

DESCRPT: CHASTAIN RD@BUSBEEPKWY

FUND: STP 0.2/0.32

OTHShare:
PE: 2002 ROW: LOCL CST: 2003 FED Share:

PROJECT: 0000557 TYPE WORK: TURN LANES

ATLANTA TMA TIP # CO 315

LENGTH (miles / km)

DESCRPT: CHASTAIN RD @ BIG SHANTY RDITOWN POINT DRIVE

FUND: STP 0.2 /0.32

OTHShare:
PE: 2002 ROW: LOCL CST: 2003 FED Share:

PROJECT: 0000558 TYPE WORK: TURN LANES .

ATLANTA TMA TIP # CO 316

LENGTH (miles / km)

DESCRPT: BARRETT PKWY @ COBB PKWY/SR 3

FUND: STP 0.21 0.32

OTHShare:
PE: 2002 ROW: LOCL CST: 2003 FED Share:

OTH Share:

PROJECT: 0000559 TYPE WORK: TURN LANES

ATLANTA TMA TIP # CO 317

LENGTH (miles / km)

DESCRPT: BARRETT PKWY @ ROBERTS BLVO

FUND: STP . 0.2/0.32

PE: 2002 ROW: LOCL eST: 2003 FED Share:

PROJECT: 0000560 TYPE WORK: PARK & RIDE LOT

ATLANTA TMA TIP # CO 318

LENGTH (miles / km)

DESCRPT: CCT PARK AND RIDE LOTS @ 3 LOCATIONS

FUND: STP . 0 /0.00

OTH Share:
PE:2001 ROW: 2001 eST: 2001 FED Share: '

~. ;~.
~~:

PROJECT: 0000598 TYPE WORK: SPECIAL STUDIES

ATLANTA TMA TIP # AR 370A

LENGTH (miles / km)

DESCRPT: CUMBERLAND RAIL CIRCULATOR ANALYSIS: PHASE I

OTHShare:

FUND:CMAQ 0/0.00

PE: 2001 ROW: NONE eST: NONE

$882,000 $706,000
$176,000 $48,000
.$250,000 $200,000
$50,000 $10,000
$75,000 $60,000
$15,000 $30,000
$100,000 $80,000
$20,000 $92,000
$450,000 $360,000
$90,000 $23,000
$65,000 $52,000
$13,000 $100,000 $400,000 $1,645,000 $1,316,000
$329,000 $800,000

Page 88 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
---- 9/21/00 -------------

COBB COUNTY

PROJECT: 0000599 TYPE WORK: SPECIAL STUDIES

ATLANTA TMA TIP # AR 370B.

.LENGTH (miles I km)

DESCRPT: CUMBERLAND RAIL CIRCULATOR ANALYSIS: PHASE 2

FUND:CMAQ 010.00

PE:2002 ROW: NONE CST: NONE

$1,200,000

PROJECT: 0000624 TYPE WORK: VEHICLE PURCHASES

FUND: CMAQ

PE:NONE

ATLANT A TMA TIP # CO AR 278

LENGTH (miles I km) 0 10.00

ROW: NONE

DESCRPT: CCT TOWN CENTER SHUTTLE SYSTEM PURCHASE - 12 MINI BUSES

CST: 2002

FED Share:

OTH Share:

PROJECT: 0000625 TYPE WORK: VEHICLE PURCHASES

FUND: CMAQ

PE:NONE

ATLANT A TMA TIP # CO AR 279

LENGTH (miles I km) 0 10.00

ROW: NONE

DESCRPT: CUMBERLAND SHUTTLE SYSTEM PURCHASE - 15 MINI BUSES

CST: 2003

FED Share:

OTH Share:

PROJECT: 0000626 TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # CO AR BPI30

LENGTH (mileslkm) 010.00

ROW: LOCL

DESCRPT: DILLARD ST FM SILVER COMET TRAIL TO MARIETTA STREET

CST: 2001

FED Share:

OTH Share:

PROJECT: 0000627 TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # CO AR BPI76A

LENGTH (miles I km) 1.2 I 1.93

ROW: LOCL

DESCRPT: SHIPP RD SIDEWALKS FM FLORENCE RD TO OLD LOST MTN

CST: 2002

FED Share:

OTH Share:

PROJECT: 0000628 TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # CO AR BPI89

LENGTH (miles I km) 4.417.08

ROW: LOCL

DESCRPT: SOUTH COBB DR EXTEND SIDEWALKS TO FAIRGROUNDS & MANER RD

CST: 2003

FEDShllre:

OTHShare:

PROJECT: 0000629 TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # CO AR BP 190

LENGTH (miles I km) 2.52 14.06

ROW: LOCL

DESCRPT: ROSWELL RD SIDEWALKS FM COBB PKWY TO ROBINSON RD

CST: 2003

FED Share:

PROJECT: 0000630 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # CO AR BP205

LENGTH (miles I km)

DESCRP~ AUSTELLSTREETSCAPEIMPROVEMENTS-3STREETS

$:
tJ'

OTHShare:

FUND: CMAQ

PE: LOCL

010.00

ROW: LOCL

CST: 2003

FED Share:

OTH Share:

$3,500,000 $2,800,000
$700,000
$4,250,000 $3,400,000
$850,000
$299,000 $239,000 $60,000
$360,000 $288,000 $72,000
$930,000 $744,006 $186,000
$1,003,000 $802,000 $201,000
$1,563,000 $1,250,000
$313,000

Page 89 of336

__ --_. .._- -------------------:-----
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

COBB COUNTY

PROJECT: 0000631 TYPE WORK: BRIDGES

FUND: CMAQ

ATLANTA TMA TIP # CQ AR BP209

LENGTH (miles / km) 0.2 /0.32

DESCRPT: SILVER COMET TRAIL GRADE SEPARA nON AT SR 6/US 278

PE:LOCL ROW: LOCL CST: +003 FED Share:

PROJECT: 712760- TYPE WORK: NEW CONSTRUCTION

FUND: NHS

ATLANT A TMA TIP # CO AR 070B

LENGTH (miles 1 km) 0.681 1.09

DESCRPT: EAST-WEST CONN INTCH W/I-285 E RAMPS& ATLANTA RD BRDG-PH6

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 712762-

OTHShare:
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:

$436,000 $349,000
$87,000
UNDERWAY $3,962;000 $11,579,000 $9,263,200 $2,315,800

PROJECT: 712762 TYPE WORK: NEW CONSTRUCTION

FUND:NHS

ATLANT A TMA TIP # CO AR 070C

LENGTH (miles 1 km) 0.68 11.09

DESCRPT: EAST-WEST CONN @ 1-285 W RAMPS AND CD ROADSI PHASE 7

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 7 I2760-

PE: 1996 ROW: LOCL CST: 2003 FED Share: GA Share:

UNDERWAY
$9,519,000 $7,615,200 $1,903,800

PROJECT: 712806- TYPE WORK: INTERCHANGE

FUND: 1M

ATLANTA TMA TIP # CO AR 078M

LENGTH (miles 1 km} 0.2 /0.32

DESCRPT: KENNEDY INTERCHANGE 1-75NB TO P285WB FLYOVER BRIDGE (CT 5)

EXIST. LANES: 00 PROPOSED LANES: 02

PE: 1997 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$10,00 I ,000 $9,000,900 $1,000,100

PROJECT: 713640- TYPE WORK: WIDENING

FUND: NHS

ATLANTA TMA TIP # AR 318B

LENGTH'(miles / km) 13.1 121.06

DESCRPT: 1-575 FM 1-75 NORTH TO SIXES ROAD/CHEROKEE ~ FOR HOV

EXIST. LANES: 04 PROPOSED LANES: 06

. ASSOCIATED PROJECTS: 71364X-

PE: 2001 ROW: NONE CST:

$7,000,000 AFTER 2003

PROJECT: 713700- TYPE WORK: REST AREA

FUND:NHS

ATLANTA TMA TIP# CO AR 274

LENGTH '(miles 1 km) 0.2/0.32

DESCRPT: 1-75 CONSTRUCT GATEWAY WELCOME CENTER @ WADE GREEN ROAD

PE: 1996 ROW: NONE eST: 2001 FED Share:

PROJECT: 714020 TYPE WORK: BRIDGE PAINTING

ATLANTA TMA TIP # AR 131L

LENGTH (miles / km)

DESCRPT: BRIDGE PAINTING ON INTERSTATES IN COBB COUNTY

LUMP SUM PROJECT

FUND: 1M 0/0.00

OTH Share:
PE:NONE ROW: NONE eST: 2001 FED Share: GA Share:

UNDERWAY $ I4,000,000 . $ I 1,200,000
$2,800,000
$491,000 $441,900
$49,100

PROJECT: 714090- TYPE WORK: ATMS/ITS

FUND:NHS

ATLANTA TMA TIP # AR 341

LENGTH [miles r km) 8.58/13.81

DESCRPT: ATMS/I-575 COMM/SURVEILLANCE FM 1-75 TO SR 92/CHEROKEE

ASSOCIATED PROJECTS: 71409X

PE: 2001 ROW: NONE eST: 2002 FED Sit are: GA Share:

$100,000
$6,332,000 $5,065,600 $1,266,400

Page 900/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

COBB COUNTY

PROJECT: 714130- TYPE WORK: HOY LANES

FUND:NHS

ATLANTA TMA TIP # AR 3 I 8A

LENGTH (miles 1 km) 14.2122.78

DESCRPT: 1-75 FM KENNEDY PKWY TO WADE GREEN ROAD FOR HOY LANES

EXIST. LANES: 08 PROPOSED LANES: 10

PE: 2001 ROW: 2003 CST:

$9,999,000 $13,000,000 AFTER 2003

PROJECT: 714150- TYPE WORK: TURN LANES

ATLANTA TMA TIP # CO 308

LENGTH (miles 1 km)

DESCRPT: 1-75 AT CHASTAIN RD - SB AND NB OFF RAMPS

FUND:NHS
0.56/0.90

PE: 1999 ROW: NONE . CST: 2002 FED Share: GA Share:

UNDERWAY
$1,754,000 $1,403,200
$350,800

PROJECT: 714160- TYPE WORK: TURN LANES

ATLANTA TMA TIP # CO 309

LENGTH (miles I km)

DESCRPT: 1-575 AT BARRETT PARK WAY - SB & NB OFF RAMPS

FUND:NHS
0.68/1.09

PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 714170- TYPE WORK: TURN LANES

ATLANTA TMA TIP # CO 310

LENGTH (miles 1 km)

DESCRPT: 1-575 AT CHASTAIN RD - SB AND NB OFF RAMPS

FUND:NHS
0.62/1.00

PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:

UNDERWAY
$990,000 $792,000 $198,000

PROJECT: 714180- TYPE WORK: SIDEWALKS

FUND:NHS

ATLANTA TMA TIP # CO AR BPI99

LENGTH (mileslkm) 0.42/0.68

DESCRPT: CUMBERLAND BOULEVARD OYER 1-285 - ADDITION OF SIDEWALKS

PE: 2000 ROW: NONE CST: 2001 FED Share: GA Share:

$15,000
$300,000 $240,000
$60,000

PROJECT: 731865- TYPE WORK: REPLACE BRIDGE

ATLANTA TMA TIP # CO 3 I I

LENGTH (miles 1 km)

DESCRPT: SR 92 @ PROCTOR CREEK (LAKE) IN SW ACWORTH

FUND: BRIDGE

PE: 2000

0.23 10.37

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$791,000 $632,800 $158,200

PROJECT: 752290- TYPE WORK: NEW CONSTRUCTION

FUND: STP

ATLANTA TMA TIP # CO AR 078K I

LENGTH (miles 1 km)

I 1 1.61

DESCRPT: KENNEDY INTCH-MILL GREEN PKWY FM AKERS MILL TO INT.PKY"Y" .

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 75Y290-

PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$9,004,000 $7,203,200 $1,800,800

. L~}

PROJECT: 752295- TYPE WORK: NEW CONSTRUCTION

FUND: STP

ATLANTA TMA TIP # CO AR 078L

LENGTH (miles 1 km) 0.5 10.8 I

DESCRPT: KENNEDY INTCH-RIYERWOOD PKWY FM US 41 TO CUMBERLAND CIR

PE: 1995 ROW: LOCL CST: 2003 FED Share: GA Share:

UNDERWAY
$2,400,000 $1,920,000
$480,000

Page 91 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

COBB COUNTY

PROJECT: 752630- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

ATLANTA TMA TIP # CO 272

LENGTH (miles r km) 0.2/0.32

DESCRPT: CR 4455/CANTON ROAD & RR B~ OVER SR 3/US 41 N OF MAf\IETTA

ASSOCIATED PROJECTS: 75Y63Q-

PE: 1997 ROW: 2001 CST:

UNDERWAY $2,000,000 AFTER 2003

PROJECT: 753025- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

, ATLANTA TMA TIP # CO 281

LENGTH (miles / km) 0.55/0.89

DESCRPT: MARIETIA ST/SR 6 BU FM NEW MACLAND RD TO BROWNSVILLE RD/BIKE

EXIST. LANES: 03 PROPOSED LANES: 02

ASSOCIATED PROJECTS: 771230-

PE: 1999 ROW: LOCL CST: 2001 FED Share:
OTH Share:

PROJECT: 75Y290- TYPE WORK: NEW CONSTRUCTION

FUND: 1M

ATLANTA TMA TIP # CO AR 078K2

" . LENGTH (miles / km)

I /1.61

DESCRPT: KENNEDY INTCH-MILL GREEN PKWY FM AKERS MILL TO INT.PKY"Y"

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: . 752290-

PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$1,800,000 $1,440,000
$360,000
UNDERWAY
$2,500,000 $2,250,000
$250,000

. PROtECT: 762450- TYPE WORK: VEHIGLE PURCHASES

ATLANTA TMA TIP # CO AR 273

LENGTH (miles / km)

DESCRPT: REPLACEMENT OF 10 CNG EXPRESS & LOCAL BUSES

FUND:STP
0/0.00

PE:LOCL ROW: NONE CST: 2001 FED Share:

PROJECT: 762470- TYPE WORK: VEHICLE PURCHASES

ATLANTA TMA TIP # CO 282

LENGTH (miles I km)

DESCRPT: EXPRESS B,US SERVICE IN 1-75 CORRIDOR (YEAR I)

OTH Share:

FUND:CMAQ

PE:LOCL

0/0.00

ROW: NONE

CST: 2001

FED Share:

'PROJECT: 762471~. TYPE WORK: VEHICLE PURCHASES

ATLANTA TMA TIP # CO 283

I LENGTH (miles / km)

DESCRPT: EXPRESS BUS SERVICE IN 1-20 CORRIDOR (YEAR I)

OTH Share:

FUND: CMAQ

PE:LOCL

0/0.00

ROW: NONE

CST: 2001

FED Share:

OTH Share:

PROJECT: 762494- TYPE WORK: BICYCLE/PED. FACILITY

FUND:O-:1AQ

: PE: 1995

ATLANTA TMA TIP # CO AR BPI24B

LENGTH (miles / km) 0/0.00

ROW: LOCL

DESCRPT: PH 2 LUCILLE CREEK TRAIL' FM SILVER COMET TRAIL TO SHIPP RD

CST: 2002 '

FED Share:

~,
l~J'

OTHShure:

\
PROJECT: 762558- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

PE:,NONE

ATLANTA TMA TIP # CO AR BPI87C

LENGTH (mileslkm) 0.95/1.53

ROW: LOCL

DESCRPT: CUMBERLAND AND TOWN CENTER AREA & TRANSIT LINKAGES - PHASE 3

CST: 2001

FED Share:

OTH Share:

$3,250,000 $2,600,000
$650,000
$2,200,000 $1,760,000
$440,000
$2,200,000 $1,760,000
$440,000 UNDERWAY
$560,000 $448,000 $112,000
$1,000,000 $800,000 $200,000

Page 92 of336

-----,------STAT~ TRANSPORTATION IMPROvEMENT PROGRAM
9/21/00

COBB COUNTY

PROJECT: 770922- TYPE WORK: BICYCLE/PED, FACILITY

ATLANTA TMA TIP # CO AR I77B

LENGTH (miles / km)

DESCRPT: VILLAGE PKWY FM SPRING RD TO WINDY HILL ROAD

FUND: CMAQ

PE: 1995

L2 / L93

ROW: NONE

CST: 2001

FED Share:

PROJECT: 771205- TYPE WORK: BRIDGE PAINTING

FUND: STP

ATLANTA TMA TIP # AR 131H

LENGTH (miles / km) 0/0.00

DESCRPT: BRIDGE PAINTING IN COBB & CLAYTON COUNTIESI77Y205\X

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 77120X- 77Y205-

OTH Share:
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY $165,000 $132,000 $33,000
$386,000 $308,800
$77,200

PROJECT: 77Y205- TYPE WORK: BRIDGE PAINTING

FUND: 1M

ATLANTA TMA TIP # AR 131L

LENGTH (miles / km) 0/0.00

DESCRPT: BRIDGE PAINTING IN COBB & CLAYTON COUNTlES17712051X

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 771205-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$143,000 $128,700 $14,300

PROJECT: 7D7603- TYPE-WORK: CAPIT AL

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 0/0,00

ROW: NONE

DESCRPT: TRANSIT CAPITAL (SECTION 5307) ASSISTANCE FOR FY 2001

CST: 2001

FED Share:

'GA Share:

OTH Share:

PROJECT: 7D7606- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: CAPITAL IMPROVEMENTS FOR FY 2002

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTH Share:

PROJECT: 7V7042- TYPE WORK: CAPITAL

ATLANTA TMA TIP # CO AR 23 I D

LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$9,457,000 $8,406,000 $1,051,000 $1,051,000
$4,641,000 $4,125,000
$516,000 $516,000
$69,000 $69,000 $17,000

PROJECT: MOOOl73 TYPE WORK: RESURFACE & MAINTENANCE

ATLANTA TMA TIP # AR 130H

LENGTH (miles / km)

DESCRPT: SR 5 FROM SR 8 TO SR 280

LUMP SUM PROJECT

FUND: STP 8.24/13.27

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$2,816,000 $2,252,800
$563,200

'"
~.
~~.~.:.

PROJECT: MOOOl74 TYPE WORK: RESURFACE & MAINTENANCE

FUND: STP

ATLANTA TMA TIP # AR l30H

LENGTH (miles / km) 8.18/13.17

DESCRPT: SR 280 FM CHATTAHOOCHEE RIVTO SR 5/AUSTELL ROAD

LUMP SUM PROJECT

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$2,624,000 $2,099,200
$524,800

Page 93 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _ _ _ _ _ _ ~ _ _ "''''

9/21/00

1''O<I''!~~

'''''''... _ _ ....__,~_._"

,

.... _

..

,~_.

_

COBB COUNTY

~~" .

PROJECT: TOOOOl2 TYPE WORK: CAPITAL

FUND: TRANSIT

PE: NONE

ATLANTA TMA TIP # CO AR 231 D

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: FY 2002 COBB COUNTY SECTION 5310

CST: 2002 '

FED Share:

GA Share:

$72,000 $72,000 $18,000

PROJECT: T000022 TYPE WORK: CAPITAL

ATLANTA TMA TIP # CO AR 23 ID

LENGTH (miles / km)

DESCRPT: FY 2003 COBB COUNTY SECTION 53 J0

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$80,000 $80,000 $19,000

PROJECT: T000035, TYPE. WORK: CAPITAL

ATLANTA TMA TIP # CO AR 231 D

LENGTH (miles / km)

DESCRPT: FY 2003 COBB COUNTY CAPITAL SECTION 5307

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTHShare:

$4,950,000 $4,400,0,00
$550,000 $550,000

Page 94 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
- - - - - - - - - - - - - - - - - - -9-/21-/0-0 - - _.._.--*-----~-_. _ _._--

COFFEE COUNTY
PROJECT: 422250- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 311US 441 @ MILL CREEK EXIST. LANES: 02 PROPOSED LANES: 04

FUND: BRIDGE

PE: 1992

0.8/1.29

ROW: 2001

CST: 2001

FED Share:

GA Share:

UNDERWAY $125,000
$1,954,000 $1,563,200
$390,800

PROJECT: 42Y900- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 3 IIUS 441 FM CR 416 TO N OF CURRIN RD -FOR FED PE; 421900

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 421900-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 42Y905- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 3 I FM N OF CURRIN RD TO GASMAN RD - FOR FED PE; 421905

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 42 I905-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 42Y910- TYPE WORK: WIDENING

FUND:NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 311US 441 FM NIBROXTON TO SR 107 - FOR FED PE; 421910

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 421910-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 431830- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 2.45/3.94

DESCRPT: SR 135 FM SR 311US 441 EAST TO SR 32 INCLUDING RR SEPARA nON

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2002 ROW: CST:

$290,000 AFTER 2003 AFTER 2003

PROJECT: 432115- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 135 @ SATILLA RIVER APP 6 MI S OF DOUGLAS

FUND: BRIDGE

PE: 1999

0.27/0.43

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$908,000 $726,400 $181,600

PROJECT: 432116- TYPE WORK: REPLACE BRIDGE LENGTH (miles/km)
DESCRPT: SR 135 @INDIAN CREEK APP3.5 MI S OF DOUGLAS

FUND: BRIDGE

PE: 1999

0.22/0.35

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$357,000 $285,600
$71,400

r':'. '"-:.
lsi:

PROJECT: 432118- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.25/0.40

ROW: 2001

DESCRPT: SR 135IUS 221 @ RR PROP. (NO TRACKS) @ SW WEST GREEN CTY LIM

CST: 2001

FED Share:

GA Share:

UNDERWAY $10,000
$747,000 $597,600 $149,400

Page 95 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

f r '\": .. ,,-

~ .f

._--------------_ I.. .'_9/2-1/0-0---------

COFFEE COUNTY

PROJECT: 442940- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 2.37/3.82

DESCRPT: SR 158 FM 200 FT WEST OF THURSTON PAULK RD TO SR 206

EXIST. LANES: 02 PROPOSED LANES: 04

PE:2000 ROW: 2003 CST:

UNDERWAY
$I,OOO~OOO
AFTER 2003

PROJECT: 442971- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.21 /0.34

DESCRPT: SR 268/AMBROSE-BROXTON RD @ ROSES CRK 1.1 MI W OF BROXTON

PE: 1999 ROW: 2003 CST:

UN.DERWAY $10,000
AFTER 2003

-'- . .

S
:',:
~;:;,:... ,

Page 96 of336

STATE TRANSPORTATION IMPROvEMENT PROGRAM

----_ - - _ -------_ -_ _ - .. .. ._~---_._--

...

9/21/00
......

....._. --._.--,-_._. .

COLQUITT COUNTY

PROJECT: 0000082 TYPE WORK: LANDSCAPING

FUND: STP

PE:LOCL

LENGTH (miles / km) 0/0.00

ROW: LOCL

DESCRPT: DOWNTOWN MOULTRIE STREETSCAPE COMMERCIAL HISTORIC DISTRICT

CST: 2001

FED Share:

$1,250,000 $1,000,000

OTHShare:

PROJECT: 0000429 TYPE WORK: MEDIAN WORK

FUND: NHS .

LENGTH (miles / km) 1.2/ 1.93

DESCRPT: SR 35/US 319 BET MAGNOLIA & GA/FLA RAILNET XING N OF SR37

PE: 2001 ROW: 2001 CST: 2001 FED Share: GA Share:

$250,000
$45,000 $5,000
$794,000 $635,200 $158,800

PROJECT: 422450- TYPE WORK: PASSING LANES . LENGTH (miles / km)
DESCRPT: SR 133 NB & SB FROM WESLEY CHAPEL RD TO ADEL RD EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 1.5 /2.42

PE: 2003 ROW: CST:

$126,000 AFTER 2003 AFTER 2003

PROJECT: 431780- TYPE WORK: WIDENING

FUND:STP

LENGTH (miles -jkm) 4.63/7.45

DESCRPT: SR 133 FM SPENCE FIELD TO SR 35 (E.MOULTRIE BYPASS)

EXIST. LANES: 04 PROPOSED LANES: 05
.~

PE: 2002 ROW: CST:

$619,000 AFTER 2003 AFTER 2003

.

PROJECT: 442750- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

UNDERWAY

LENGTH (miles / km) 0.2/0.32

ROW: LOCL

DESCRPT: CR 493/FUNSTON-SALE CITY @ LITTLE CREEK APP I MI NW FUNSTON

CST: 2001

$580,000

FED Share:

$464,000

GA Share:

$116,000

PROJECT: 450570- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles./ km) 0.21 /0.34

ROW: LOCL

DESCRPT: CS 1079/ADEL ROAD @ OKAPILCO CREEK IN EAST MOULTRIE

CST: 2001

FED Share:

GA Share:

UNDERWAY
$721,000 $576,800 $144,200

PROJECT: 471450- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) .0.2 /0.32

ROW: LOCL

DESCRPT: CR 4/WILBURN MURPHY RD. @ LITTLE CREEK OVERFLOW S OF FUNSTON

CST: 2003

FED Share:

GA Share:

OTHShare:

PROJECT: 471455- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.23 /0.37

ROW: LOCL

DESCRPT: CR I86/HAGET STILL ROAD @ OCHLOCKONEE RIVER SE OF DOERUN

CST: 2002

FED Share:

GA Share:

OTHShare:

UNDERWAY
$215,000 $172,000
$22,000 $21,000
UNDERWAY
$438,000 $350,400
$43,600 $44,000

Page 97 of336

_~~_~._.

STATE TRANSPORTATION IMPROVEMENTPROGRAM

y_x-.-

... ~

9/21/00
, = , _ ,__ .,.. ._~~

.... .._.. r .-.. ".-. - '_ .

.

_'~

_~'

-COLQUITT COUNTY

PROJECT: 471460- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.2 /0.32

DESCRPT: CR 355/0'NEAL ROAD @ BRUSHY BRANCH APr 3.7 MI SW OF DOERUN

PE: 1999 ROW: LOCL CST: 2003

FED Share: GA Share:

OTH Shure:

PROJECT: 471465- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.2 /0.32

ROW: LOCL

DESCRPT: CS 835/SW 13TH AVE @ OCHLOCKONEE RIVER TRIB. IN MOULTRIE

CST: 2002

FED Share:

GA Share:

OTH Shure:

PROJECT: M000351 TYPE WORK: SHOULDER WORK

FUND: STP

LENGTH (miles / km) 21.6/34.74

DESCRPT: SR 33 FM SR 133 COLQUITT CO TO CROCKETT ST WORTH CO

LUMP SUM PROJECT

PE:NONE ROW: NONE CST: 2001 FED Shure: GA Share:

_
UNDERWAY
$215,000 $172,000
$22,000 $21,000 UNDERWAY
$295,000 $236,000
$29,000 $30,000
$1,370,000 $1,096,000
$274,000

.

r .~~
L j !.: .:

Page 98 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
-_ _ ......... .. ----------------_.-- 9/21/00 -- - - - - - - - - - - -

COLUMBIA COUNTY

PROJECT: 0000150 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

AUGUSTA TMA TIP # TEA-7

LENGTH (miles I km) 010.00

DESCRPT: EVANS TO LOCKS ROAD MULTI-USEFACILITY'& LANDSCAPING

PE:LOCL ROW: LOCL CST: 2001 FED Share:

$625,000 $500,000

PROJECT: 0000695 TYPE WORK: LIGHTING

AUGUST A TMA TIP #

LENGTH (miles I km)

DESCRPT: 1-20/BELAIR ROAD INTERCHANGE LIGHTING

LUMP SUM PROJECT

FUND: NHS 0/0.00

OTH Share:
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$125,000
$287,000 $229,600
$57,400

PROJECT: 210910- TYPE WORK: REST AREA

FUND: 1M

LENGTH (miles I km) 0/0.00

DESCRPT: I-20/SR 402 SEWAGE HOOKUP FOR REST AREAS #62 AND #63

LUMP SUM PROJECT

PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$545,000 $490,500
$54,500

PROJECT: 221800- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 2.96 14.77

DESCRPT: SR 104 FM MP I 1.95 S/CR 80 TO SR 47 @ POLLARDS CORNER

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 2003 CST:

UNDERWAY $762,000
AFTER 2003

PROJECT: 221805- TYPE WORK: WIDENING

AUGUSTA TMA TIP # STP-12

LENGTH (mileslkm)

DESCRPT: SR 104 FM MP 8.95 S OF CR 515 TO MP 11.95 S OF CR 80

EXIST. LANES: 02 PROPOSED LANES: 04

FUND:STP 3/4.83

PE: 1992 ROW: 2002 CST:

UNDERWAY $1,337,000 AFTER 2003

PROJECT: 221860- TYPE WORK: WIDENING

FUND: STP

AUGUSTA TMA TIP # STP-3

LENGTH (miles I km) 2.88 14.64

DESCRPT: SR 28IFURYS FERRY RD FM RVRWATCH PKWY/RICHMONDTON OF CR 98

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 22186X- 22Y860-

PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$4,527,000 $3,621,600
$905,400

PROJECT: 222140- TYPE WORK: PASSING LANES LENGTH (miles I km)
DESCRPT: SR 47 NB MP 8.33-9.53ISB AND NB 13.48 - 15.18 EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 4.18 16.73

PE: 1997 ROW: 2002 CST:

UNDERWAY $30,000
AFTER 2003

PROJECT: 22781X- TYPE WORK: ATMS/ITS

FUND:NHS

AUGUSTA TMATIP#

LENGTH (mileslkm) 010.00

.

DESCRPT: ATMS/ AUGUSTA/RICHMOND COUNTY/GDOT REGIONAL TCC-SEE RICHMOND

f L~

ASSOCIATED PROJECTS: 227810-

PE."NONE ROW: NONE CST: NONE

Page 99 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

COLUMBIA COUNTY

PROJECT: 22Y860- TYPE WORK: WIDENING

FUND: STP

AUGUSTA TMA TIP # STP-3

LENGTH (miles I km) 0 10.00

DESCRPT: SR 28/FURYS FERRY RD FM RVRWATCH PKWY TO N OF CR 981SPLIT $

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 221860-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$2,773,000 $2,218,400
$554,600

PROJECT: 231350- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles I km) 1.43 12.30

DESCRPT: SR, 47 SB FRM MP.2.45 NEAR KEG CREEK SOUTH TO MP 3.88
EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1994 ROW: 2002 CST:

UNDERWAY '$77,000
AFTER 2003

PROJECT: 231440- TYPE WORK: WIDENING

AUGUSTA TMA TIP # STP-2

LENGTH (miles I km)

DESCRPT: SR 232 FM JUST WEST OF CRAWFORD CK TO CR 223

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 0000809

FuND:STP 1.4212.29

PE: 2001 ROW: CST:

$4 15,000 AFTER 2003 AFTER 2003

PROJECT: 231710- TYPE WORK: MEDIAN WORK

FUND: STP .

AUGUSTATMATIP#STP-19

LENqTH(mileslkm) 4.7117.58

DESCRPT: SR 104/WASHINGTON RD FM FLOWING WELLS RD TO HALALI FARM RD

PE: 2003 ROW: CST:

$447,000 AFTER 2003 AFTER 2003

.

PROJECT: 232306- TYPE WORK: REPLACE.BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.22 10.35

DESCRPT: SR 223 @ UCHEE CREEK 2.2 MI NW OF GROVETOWN

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 250470- TYPE WORK: WIDENING

FUND: STP

AUGUSTA TMA TIP #~STP-5

LENGTH (miles I km) 2.55 14.1 I

DESCRPT: OLD PETERSBURG RD/OLD EVANS FM BASTON RD TO WASHINGTON RD; R

EXIST. LANES: 02 PROPOSED LANES: 04 '

ASSOCIATED PROJECTS: 25R470-

PROJECT: 25056X- TYPE WORK: WIDENING

FUND: STP

AUGUSTA TMA TIP# STP-T2-5

LENGTH (mileslkm) 010.00'

DESCRPT: DAVIS RD FM SCOTT NIXON BLVDIRICHMOND TO WASHINGTON ROAD

sxisr. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 250560-
\

PROJECT: 25R470- TYPE WORK: WIDENING

FUND: STP

AUGUSTA TMA TIP # STP-5

LENGTH (miles I km} 2.55 14.11

DESCRPT: OLD PETERSBURG RD/OLD EVANS FM BASTON TO WASHINGTON-250470

:f
0> .
~_:"

EXIST. LANES: 02 PROPOSED LANES: 05 ASSOCIATED PROJECTS: 250470-

PE: 1992 ROW: 2002 CST:

UNDERWAY $1,400,000 AFTER 2003

PE:NONE ROW: LOCL CST: NONE

PE: 1992 ROW: 2002 CST: NONE

UNDERWAY $ I6,850,000

Page 100 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

- _. ., - ._,..._----. . . . =-----_-...""'~-,...-.._~

9121100

""-"--..;...--------_.~_._-----

COLUMBIA COUNTY

PROJECT: 262080- TYPE WORK: WIDENING

FUND: STP

AUGUSTATMATIP# STP-13

LENGTH (miles 1 km) 2.29/3.69

DESCRPT: SR 104 FM CR 91/HALALI FARM RD TO E/CR 5 I5 (INCL BRIDGES)

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 2003 CST:

UNDERWAY $1,995,000 AFTER 2003

PROJECT: 811062- TYPE WORK: WEIGHSTATION

FUND: 1M

LENGTH (miles 1 km) 010.00

DESCRPT: UPGRADE 1-20 EB AND WB WEIGH STATIONS INCL SCALE REPLACEMENT

PE: 1995 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $75,000
$8,000,000 $7,200,000
$800,000

j~
:~-_. :,.'

Page 10J of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

COOK COUNTY
PROJECT: 0000764 TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: 1-75 FM SR 37 TO CR 246/KINARD BRIDGE RD - PHASE 2 EXIST. LANES: 06 PROPOSED LANES: 08

FUND: NHS 9.3 114.97

PE: 1993 ROW: 2002 CST:

UNDERWAY $5,421,000 AFTER 2003

PROJECT: 0000765 TYPE WORK: WIDENING LENGTH (mileslkm)
DESCRPT: 1-75 FM CR 246/COOK TO CR 204 IN TIFT CO - PHASE 2 EXIST. LANES: 06 PROPOSED LANES: 08

FUND: NHS 9.8/15.78

PE: 1993 ROW: 2002 CST:

UNDERWAY $4,372,000 AFTER 2003

PROJECT: 410420- TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles I km) 0.6/0.97

DESCRPT: 1-75 @ SR 37/ADEL [FM 1500 FT WEST TO 650 FT EAST 1-75]

EXIST. LANES: 02 PROPOSED LANES: 05

PE: 1992 ROW: 2001 CST:

UNDERWAY $6,164,000 AFTER 2003

PROJECT: 410530- TYPE WORK: WIDENING

FUND: NHS

PE: 1993

UNDERWAY

LENGTH (miles r km) 9.8/15.78

ROW: NONE

DESCRPT: 1-75 FM CR 246/COOK TO CR 204 IN TIFT CO - PHASE IIX

CST: 2003

$29,233,000

EXIST. LANES: 04 PROPOSED LANES: 06 ASSOCIATED PROJECTS: 41053X-

FED Share: GA Share:

$23,386,400

$5,846,600

.

PROJECT: 442990- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.27/0.43

DESCRPT: SR 37 @ WITHLACOOCHEE RIVER O/F APP 6 MI E OF ADEL

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

5e.:
~.:.~":.,,

Page 102 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

COWETA COUNTY
PROJECT: 0000091 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: COWETA COUNTY BIKE NETWORK

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000092 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: NEWNAN TEMPLE/CLARK CORRIDOR IMPROVEMENT & LANDSCAPING

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTR Share:

PROJECT: 0000569 TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE:LOCL

LENGTH (miles / km) 0/0.00

ROW: LOCL

DESCRPT: SENOIA MULTI-USE TRAIL FROM CITY PARK TO BALL FIELD

CST: 2001

FED Share:

PROJECT: 0000818 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR 16 AT SR 74/SR 85 IN SENOIA LUMP SUM PROJECT

FUND: STP 0.57 / O. 92

OTRShare:
PE: 2001 ROW: 2002 CST: 2002
reo ss.o
GA Share:

$100,000 $80,000
$20,000
$500,000 $400,000 $100,000
$342,000 $274,000
$68,000 $10,000 $79,000 $282,000 $253,800 $28,200

PROJECT: 0000930 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR I4/US 29 AT CR 33/WELDON ROAD LUMP SUM PROJECT

FUND: STP 0.49/ O. 79

PE: 2001
ROW: LOCL CST: 2003
reo sns-
GA Share:

$21,000
$381,000 $342,900
$38,100

PROJECT: 3 I 1790- TYPE WORK: RAMP

FUND: 1M

LENGTH (miles / km) 0.2 /0.32

DESCRPT: I-85/SR 34 RAMP RECONSTRUCTION SOUTHEAST QUADRANT

EXIST. LANES: 00 PROPOSED LANES: 01

PE:1995 ROW: 2002 CST:

UNDERWAY $1,601,000 AFTER 2003

PROJECT: 322060- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 2.25/3.62

DESCRPT: SR 54/34 FM FISCHER CROSS ROAD TO SR 74 /& FAYETTE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 32206X- 322065-

PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $1,806,000 $4,000,000 $3,200,000
$800,000

. Lf;

PROJECT: 322063- TYPE WORK: BRIDGE REHAB LENGTH (miles / km)
DESCRPT: SR 54 OVER LINE CREEK/ALSO FAYETTE CO EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 32206Z- 322060-

FUND: BRIDGE

PE: 1992

0.42/0.68

ROW: NONE

CST: 200)

FED Share:

GA Share:

UNDERWAY
$851,000 $680,800 $170,200

Page 103 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
._----,------_."._----_._.~ . ._,- __9/21/00 --------- _._--- ._--~---_.

COWETA COUNTY
PROJECT: 322340- TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR 34 E/NEWNAN FM SR 154 TO FISCHER RDICR 552 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 322345- 32Y340-

FUND: STP 3.86/6.21

PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $9,731,000 $4,731,000 $3,784,800
$946,200

PROJECT: 322345- TYPE WORK: BRIDGE REHAB LENGTH (miles 1 km)
DESCRPT: SR 34 @ SHOAL CREEK EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 322340-

FUND: BRIDGE

PE: 1992

0.2/0.32

ROW: NONE

CST: 2003

FED Share:

GA Share:

UNDERWAY
$968,000 $774,400 $193,600

PROJECT: 322800- TYPE WORK: NEW CONSTRUCTION

FUND: STP .

LENGTH (miles r km) 6.2/9.98

DESCRPI:: NEWNAN SOUTHWEST BYPASS FM SR 34 TO SR 14 AT SR 16

EXIST. LANES: 00 PROPOSED LANES: 02

PE: 2001 ROW: CST:

$1,000,000 AFTER 2003 AFTER 2003

PROJECT: 333120- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

PE: 1999

UNDERWAY

LENGTH (mileslkm) 0.2/0.32

ROW: LOCL

DESCRPT: SR 14/US 29/27 ALT AT CR 201lEAST CAMP STREET

CST: 2001

$331,000

LUMP SUM PROJECT

FED Share: GA Share:

$297,900

$33,100

..

PROJECT: 343495- TYPE WORK: INTERSECTION IMPROVEMENT

.' .

LENGTH (miles 1 km)

DESCRPT: SR 154 AT RAYMOND HILL RD/CR 32 JUST SOUTH OF 1-85

LUMP SUM PROJECT

FUND: STP 0.2 10.32

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$136,000 $122,400
$13,600

PROJECT: 371306- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles 1 km) , 0.32 10.52

ROW: LOCL

DESCRPT: CR 211HAPPY VALLEY CIRCLE @ BROWNS CREEK 6 MI N OF NEWNAN

CST: 2001

FED Share:

ASSOCIATED PROJECTS: 371332-

GA Share:

UNDERWAY
$361,000 $288,800
$72,200

PROJECT: 371331- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (mileslkm) 0.12/0.19

ROW: LOCL

DESCRPT: CR 91/MCINTOSH TRAIL@SOU. RR (718851J) W OF SHARPSBURG

CST: 2001

FED Share:

GA Share:

UNDERWAY
$363,000 $290,400
$72,600

~;
~
~::.~;~_.

PROJECT: 3.71332- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

. PE: 1999

LENGTH (miles 1 km) 0.42 10.68

ROW: LOCL

DESCRPT: CR 14/JIM STARR ROAD @ CEDAR CREEK 6 MI N OF NEWNAN

CST: 2001

FED Share:

ASSOCIATED PROJECTS: 371306-

GA Share:

UNDERWAY
$377,000 $301,600
$75,400

Page 104 0/336

STATE TRANSPORTATiON IMPROVEMENT PROGRAM
9/21/00

COWETA COUNTY

PROJECT: 371333- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.25 /0.40

ROW: LOCL

DESCRPT: CR 201/BETHLEHEM CH. ROAD @ NEW RIVER 3.5 MI S OF NEWNAN

CST: 2001

FED Share:

GA Share:

UNDERWAY
$321,000 $256,800
$64,200

PROJECT: 371334- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.25 /0.40

ROW: LOCL

DESCRPT: CR 227/GRANDMA BRANCH RD. @ NEW RIVER 2.5 M NW OF GRANTVILLE

CST: 2001

FED Share:

ASSOCIATED PROJECTS: 371335-

GA Share:

UNDERWAY
$363,000 $290,400
$72,600

PROJECT: 371335-' TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.25 /0.40

ROW: LOCL

DESCRPT: CR 227/GRANDMA BRANCH RD. @ NEW RIVER TRIB. NW OF GRANTVILLE

CST: 2001

FED Share:

ASSOCIATED PROJECTS: 371334-

GA Share:

UNDERWAY
$299,000 $239,200
$59,800

PROJECT: 371336- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.25 /0.40

ROW: LOCL

DESCRPT: CR 25/0LD ATLANTA HWY @ WAHOO CREEK N OF NEWNAN

CST: 2001

FED Share:

GA Share:

UNDERWAY
$419,000 $335,200 $83,800

;:
"

PROJECT: 371337- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

UNDERWAY

LENGTH (miles / km) 0.25 /0.40

ROW: LOCL

DESCRPT: CR 14/BRIMER ROAD @ CEDAR CREEK 6 MI N OF NEWNAN

CST: 2001

$438,000

FED Share:

$350,400

GA Share:

$87,600

"
L .s.
~~.

Page 105 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

..--""-_ _' :024_.

,_,.

. 9/21/00
~_.

......._~__._,

"""" .__

CRA WFORD COUNTY

PROJECT: 363130- TYPE WORK: WIDENING

FUND: STATE

LENGTH(mileslkm) 9.8/15.78 DESCRPT: SR 96 FM E OF FLINT RIV TO FT VALLEY BP/SR 49C & BRIDG/PEACH EXIST. lANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 36313X- 36Y 130-

PE: 1992 ROW: 2001 CST: 2001
GA Share:

UNDERWAY $1,019,000 $17,604,000
$17,604,000

PROJECT: 36Y 130- TYPE WORK: WIDENING

FUND: BRIDGE

PE:NONE

LENGTH (miles 1 km) 0/0.00 '

ROW: NONE

DESCRPT: SR 96 AT MACOMIS CREEK - FOR BR FUNDING; SEE 363130 . EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 363130-

CST: 2001 FED Shure:
GA Shure:

$500,000 $400,000 $100,000

..

..

-;

Page J06 of336

STATE TRANSPORtATION IMPROVEMENT PROGRAM

---,-_ ------_.---_.-------_ .. 9/21/00 _-----------"--._._~._~,-_._-_ .....

.

..:.:

FUND:NHS

PE:NONE

0/0.00

ROW: NONE

CST: NONE

PROJECT: 410260- TYPE WORK:' WIDENING

FUND: NHS

LENGTH (miles / km) 6.9/11.11

DESCRPT: 1-75 FM SR 300 TO DOOL Y COUNTY LINE & 41 R260 FOR HPP RlW $

EXIST. LANES: 04 PROPOSED LANES: 08

ASSOCIATED PROJECTS: 41R260-

PE: 1986 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $1,457,000 $14,300,000 $11,440,000 $2,860,000

PROJECT: 41R260- TYPE WORK: WIDENING

FUND: HPP

LENGTH (miles / km) 11.9/19.13

DESCRPT: 1-75 FM SR 300 TO DOOLY COUNTY LINE - FOR HPP RlW $1410260

EXIST. LANES: 04 PROPOSED LANES: 08

ASSOCIATED PROJECTS: 410260-

PE: 1986 ROW: 2001 CST: NONE

UNDERWAY $10,312,000

. PROJECT: 450550- TYPE WORK: BRIDGES

FUND: STP

LENGTH (miles / km) 0.31 /0.50

DESCRPT: 24th AVENUE/SR 987 GRADE SEPARATION AT NORFOLK SOUTHERN RR

PE: 1998 ROW: 2002 CST:

UNDERWAY $700,000
AFTER 2003

PROJECT: 471427- TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: STREETSCAPES IN THE CITY OF CORDELE

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

$250,000 $200,000
'$50,000

Page 1070[336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

DADE COUNTY

PROJECT: 0000136 TYPE WORK: LANDSCAPING

FUND: STP

CHAITANOOGA TMA TIP #

LENGTH (miles / km) 0/0.00

DESCRPT: LOOKOUT MOUNTAIN PARK WAY SCENIC OVERLOOKJSR 189

PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 610990- TYPE WORK: REPLACE BRIDGE

CHATTANOOGA TMA TIP # IM-97-8

LENGTH (miles / km)

DESCRPT: 1-24/1-59 INTERCHANGE - THREE BRIDGES

FUND: 1M 0 /0.00

OTHShare:
PE: ]995 ROW: NONE CST: 2001 FED Share: GA Share:

$125,000 . $100,000
$25,000
UNDERWAY
$4,118,000 $3,706,200
$41 ],800

PROJECT: 611020- TYPE WORK: WIDENING

CHATTANOOGA TMA TIP # NH-24-01

. LE(VGTH (mileslkm)

DESCRPT: 1-24/SR 409 FROM I-59 TO TENNESSEE STATE LINE

EXIST. LANES: 04 PROPOSED LANES: 06

FUND: NHS 3.27/5.26

PE: 1998 ROW: NONE . CST: 2003 FED Share: GA Share:

UNDERWAY
$7,150,000 $5,720,000 $1,430,000

PROJECT: 611080- TYPE WORK: INTERCHANGE

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: 1-591SR 406- NEW INTERCHANGE AT HICKS HOLLOW ROAD (CR 271)

PE: 1999 ROW: 2003
CST:

UNDERWAY $3,000,000 AFTER 2003

PROJECT: 621230- TYPE WORK: WIDENING .

FUND: STP

LENGTH (miles 1 km) 0.8 /1.29

DESCRPT: SR 136 FM CR 52 TO SR 58/US II {INCLUDE INT W/I-59}/621230IY

EXIST. LANES: 02 PROPOSED LANES: 05

ASSOCIATED PROJECTS: 62Y230-

PROJECT: 62Y230- TYPE WORK: WIDENING

FUND: 1M

LENGTH (miles / km) 010.00

DESCRPT: SR 136 FM CR 52 TO SR 58 {FOR 1M $ FOR INT W/I-59} /621230jY

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 621230-

. PE: 1992 ROW: 2003 CST:

UNDERWAY $410,000
AFTER 2003

PE:NONE ROW: 2003 CST:

$100,000 AFTER 2003

Page J08 0/336

STATE TRANSPORTATION IMPROVEMENTPROGRAM
----_._---_._---------- 9/21/00 ------------------

DAWSON COUNTY

PROJECT: 0000202 TYPE WORK: TURN LANES

FUND: STP

LENGTH (mileslkm) 0.37/0.60

DESCRPT: SR 53 AT BLUE RIDGE OVERLOOKICR 195 & WAR HILL PARK RD/CR218

L UMP SUM PROJECT

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$194,000 $174,600
$19,400

PROJECT: 0000316 TYPE WORK: SAFETY LENGTH (miles 1 km)
DESCRPT: SR 52 HORIZONTAL CORRECTION @ MP 6.4 TO 6.6

FUND:STP 0.2/0.32

PE: 2003 ROW: CST:

$270,000 AFTER 2003 AFTER 2003

PROJECT: 132790- TYPE WORK: INTERCHANGE LENGTH (miles 1 km)
DESCRPT: SR 400 INTERCHANGE AT SR 53

FUND:APD 0.5/0.81

PE: 1998 ROW: 2002 CST:

UNDERWAY $15,000,000 AFTER 2003

"" ,
"

Page 109 of336

STATE TRANSPORTATIONIMPROVEMENT PROGRAM

.



..

'_''_K'

9/21/00

,..

,_ _ __ """,...-

_

DECATUR COUNTY

PROJECT: 0001236 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.1 /0.16

DESCRPT: SR 253/SPRING CREEK RD AT SR I1US 27/BAINBRIDGE BYP NB RAMP

LUMP SUM PROJECT .

.PE: 2001 ROW: NONE CST: 2002 FED Share: GA Share:

$5,000
$83,000 . $74,700
$8,300

PROJECT: M000346 TYPE WORK: SHOULDER WORK LENGTH (miles / km)
DESCRPT: SR 309 FM FLORIDA STATE LN TO N OF CR 490 LUMP SUM PROJECT.

FUND: STP 13.8122.25

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$1,262,000 $1,009,600
$252,400

Page 110 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

- - - - .....- . - -........- - .

,...'~

',"_..........-

"'~ _ _\'i _ _,

.. _ _" ' _ ~ _ m '

_

DEKALB COUNTY

,"

PROJECT: 0000172 TYPE WORK: BICYCLE/PED. FACILITY

FUND:STP

PE:LOCL

ATLANTA TMA TIP # DK AR BP039

LENGTH (miles I km) 010.00

ROW: LOCL

DESCRPT: CHAMBLEE STREETSCAPE PHASE 2

CST: 2001

FED Share:

$350,000 $280,000

PROJECT: 0000173 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # DK AR BP040

LENGTH (miles I km)

DESCRPT: STONE MOUNTAIN/ATLANTA TRAIL PHASE 3

FUND:STP 010.00

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

$70,000
$1,200,000 $960,000

PROJECT: 0000174 TYPE WORK: LANDSCAPING

ATLANTA TMA TIP # DK AR BP041 ,

LENGTH (miles I km)

DESCRPT: MURPHEY CANDLER LAKE RESTORATION

FUND:STP 010.00

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

$240,000
$1,500,000 , $1,200,000

PROJECT: 0000176 TYPE WORK: HISTORIC PRESERVATION

ATLANTA TMA TIP # DK AR BP042

LENGTH (miles I km)

DESCRPT: OLD DECATUR RAILROAD DEPOT REHABILITAnON

FUND:STP 010.00

OTH Share:
PE:LOCL' ROW: LOCL CST: 2001 FED Share:

$300,000
$283,OQO $226,000

PROJECT: 0000177 TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # DK AR BP043

LENGTH (miles I km)

DESCRPT: DECATUR DOWNTOWN STREETSCAPE PHASE 3

ASSOCIATED PROJECTS: 771224-

FUND:STP 010.00

PROJECT: 0000178 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # DK AR BP044

LENGTH (miles I km) 0 10.00

DESCRPT: ATL PED INTERSECT IMP/STSCAPING/DUNNWOODY MARTA/PER MALL

OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$57,000
$1,500,000 $1,200,000
$300,000-
$1,200,000 $960,000

PROJECT: 0000204 TYPE WORK: LANDSCAPING

FUND: STP

ATLANTATMA TIP # DKARBP045

LENGTH (mileslkm) 0/0.00

DESCRPT: DECATUR MLK JR HARMONY PARK/OAKHURST BUSINESS DISTRICT

OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$240,000
$79,000 $63,000

PROJECT: 0000374 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: 1M

ATLANTA TMA TIP # AR 130P

LENGTH (miles I km) 0 10.00

DESCRPT: 1-285/1-20 INTERMEDIATE SOLUTION TO REDUCE TRUCK OVERTURNING

~:.",.

OTH Share:
PE: 2000 ROW: NONE CST: 2001 FED Share: 'GA Share:

$16,000
UNDERWAY
$1,500,000 $1,350,000
$150,000

Page I JJ of336

,

. ,_ _'

STATE TRANSPORTATION IMPROVEMENT PROGRAM

. . . . . . . ; ._ _0. _ _. _

.0. . . . . ,_~~, 9/Q2_.1/00

.

.

DEKALB COUNTY

PROJECT: 712870- TYPE WORK: INTERCHANGE

FUND: DEMO

ATLANTA TMA TIP # DK AR059A

LENGTH (miles / km) 3.5/5.64

DESCRPT: 1-20 @LITHONIA INDUSTRIAL BLVD & 71Y870 FOR OTH $

PE: 1992 ROW: 1998 CST: 2003

EXIST. LANES: 00 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 71Y870-

GA Share:

_
UNDERWAY UNDERWAY
$800,000 $640,000 $160,000

PROJECT: 713220- TYPE WORK: INTERCHANGE

FUND: 1M

ATLANTA TMA TIP # DK AR 182A

LENGTH (miles / km) 1.4 /2.25

DESCRPT: 1-20 @ WESLEY CHAPEL RD & RELOC FRONTAGE RD{ SNAPFINGER}

PE: 1995 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $3,910,000 $6,591,000 $5,931,900
$659,100

PROJECT: 713250- TYPE WORK: INTERCHANGE

FUND: 1M

ATLANTA TMA TIP # DK AR 183

LENGTH (miles / km)

I /1.61

DESCRPT: 1-285 SOUTH AUXILLARY LN FM SR 8 TO STN MTN FWY & FWY BRIDGE

ASSOCIATED PROJECTS: 713320-.

PE: 1995 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$2,543,000 $2,288,700
$254,300

PROJECT: 713280- TYPE WORK: INTERCHANGE

FUND: 1M

ATLANTA TMA TIP # DK AR 205

LENGTH (miles / km) 0/0.00

DESCRPT: 1-285 @ SR 10/MEMORIAL DR & RELOCATE GEORGE LUTHER DR

EXIST. LANES: 04 PROPOSED LANES: 06

PE: 1997 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $17,487,000 $10,228,000 $9,205,200
$1,022,800

PROJECT: 713290- TYPE WORK: INTERCHANGE

ATLANTA TMA TIP # DK AR 206

LENGTH (miles / km)

DESCRPT: 1-285@SR I55/FLAT SHOALS ROAD

EXIST. LANES: 04 PROPOSED LANES: 06

FUND: 1M 0.2 /0.32

PE: 1999 ROW: 2001 CST:

UNDERWAY $1,150,000 AFTER 2003

/
PROJECT: 713300- TYPE WORK: INTERCHANGE

ATLANTA TMA TIP # DK AR 207

. LENGTH (miles / km)

DESCRPT: 1-285 @ BOULDERCREST ROAD

EXIST. LANES: 04 PROPOSED LANES: 06

FUND: 1M 0/0.00

PE: 1998 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $1,150,000
$18,400,000 $16,560,000
$1,840,000

PROJECT: 713320- TYPE WORK: INTERCHANGE,

ATLANTA TMA TIP# DKAR 184

LENGTH (miles/km)

DESCRPT: 1-285 @ SR 8/US 29/LA WRENCEVILLE HIGHWAY

EXIST. LAN~S: 04 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 713250-

FUND: 1M 0.7/1.13

PE: 1995 ROW: 2002 CST:

UNDERWAY $6,847,000 AFTER 2003

f .'
~i~/

PROJECT: 713373- TYPE WORK: ATMSIITS

FUND:CMAQ

PE:2000

ATLANTA TMA TIP # AR 281

LENGTH (miles / km) 12.5 120.11

ROW: NONE

DESCRPT: ATMS/I-285 SURVEIL FM 1-75/CLAYTON NE THRU FULTN TO 1-20/DEK

CST: 2001

FED Share:

ASSOCIATED PROJECTS: 71337Z-

GA Share:

$5,000
$6,300,000 $5,040,000 $1,260,000

Page Jl2 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

DEKALB COUNTY

PROJECT: 713410- TYPE WORK: ATMS/ITS

FUND: CMAQ

'ATLANTA TMA TIP # DK AK 215A

LENGTH (miles/km) 17.5/28.09.

DESCRPT: ATMS: 1-285 COMM/SURVEIL FM S OF FLAT SHOALS TO 1-85 N

PE.NONE ROW: NONE CST: 2001

FED Share:

GA Share:

$10,045,000 $8,036,000 $2,009,000

PROJECT: 714000- TYPE WORK: INTERCHANGE

ATLANTATMA TIP#DKAR219

LENGTH (miles Zkm)

DESCRPT: '1-285 @ ASHFORD DUNWOODY ROAD

EXIST. LANES: 04 PROPOSED LANES: 06

FUND: 1M 0.5/0.81

PE:NONE ROW: 2001 CST: 2003 FED Share: GA Share:

$7,000,000 $30,000,000 $27,000,000
$3,000,000

PROJECT: 714110- TYPE WORK: BARRIERS

FUND: NHS

ATLANTA TMA TIP # AR 303

LENGTH (miles / km) 3.11 /5.01

DESCRPT: 1-20 NOISE BARRIERS FM FLAT SHOALS ROAD TO COLUMBIA DR (N&S)

PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$3,000,000 $2,400,000
$600,000

PROJECT: 71Y870- TYPE WORK: INTERCHANGE

FUND: OTHER

PE: 1992

ATLANT A TMA TIP # DK AR 059B

LENGTH (miles / km) 0/0.00

ROW: 1998

DESCRPT: 1-20 @L1THONIA INDUSTRIAL BLVD - FOR OTHER $ISEE 712870

CST: 2003

EXIST. LANES: 00 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 712870-

GA Share:

UNDERWAY UNDERWAY $32,086,000 $25,668,800
$6,417,200

PROJECT: 721405- TYPE WORK~' REPLACE BRIDGE ,

ATLANT A TMA TIP # DK 022B

LENGTH (miles / km)

DESCRPT: ASHFORD-DUNWOODY RD @NANCY CRK & 72Y405-

ASSOCIATED PROJECTS: 72Y405-

FUND: BRIDGE

PE: 1992

0.52 /0.8:t

ROW: LOCL

CST: 2001

FED Share:

GA Share:

UNDERWAY
$1,188,000 $950,400 $237,600

PROJECT: 721820- TYPE WORK: WIDENING

FUND: STP

ATLANTA TMA TIP # DK 056

LENGTH (miles / km) 1.4 /2.25

DESCRPT: SNAPFINGER RD FM WESLEY CHAPEL RD TO S OF RIDERS TRAIL

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2001 ROW: NONE CST:

$117,000 AFTER 2003

PROJECT: 722145- TYPE WORK: ATMSIITS

FUND:NHS'

ATLANTA TMA TIP # AR 306

LENGTH (miles / km) 5.52/8.89

DESCRPT: ATMS/SRI41 COMM/SURVEIL FM 1-285 TO SPALDING DRiGWINNETT

ASSOCIATED PROJECTS: 72214X-

PE: 2001 ROW: NONE CST: 2002 FED Share: GA Share:

$200,000
$5,032,000 $4,025,600 $1,006,400

~
~:..

.

~~;;;::

PROJECT: 731500- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # DK 254

LENGTH (miles / km) 0.23 /0.37

DESCRPT: SR 42/BRIARCLIFF ROAD AT SHERIDAN ROAD/CR 139

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$703,000 $632,700.
$70,300

Page 1130/336

.... r--------------------~~~,.,~~

tt _ _. - ' ,_ _ lSI'a

STATE TRANSPORTATION IMPROVEMENT PROGRAM

. - -_ _,_.". '

- - - - - - _ 9/21/00

_ .. o _ o ,

_

.. ----,------,

DEKALB COUNTY

PROJECT: 731770- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: HPP

ATLANTA TMA TIP # DK 266

LENGTH (miles 1 km) 8.281 13.33

DESCRPT: BUFORD HIGHWAY/SR 13/US 23 ARTERIAL ENHANCEMENTS

PE: 1999 ROW: NONE CST: 2001 FED Share:

UNDERWAY
$1,312,000 $1,050,000

OTH Share:

PROJECT: 75 I 320- TYPE WORK: REPLACE BRIDGE

ATLANTA TMA TIP # DK 101

LENGTH (mileslkm)

DESCRPT: CR 5 I89/ROCKBRIDGE RD@ SNAPFINGER CREEK

FUND: BRIDGE

PE: 1991

0.28/0.45

ROW: LOCL

CST: 2001

FED Share:

GA Share:

$262,000
UNDERWAY
$1,150,000 $920,000 $230,000

PROJECT: 75287X TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # AT 163

LENGTH (mileslkm) 0/0.00

DESCRPT: SR 154/MEMORIAL DRIVE AT MORELAND AVE - SEE FULTON CO

ASSOCIATED PROJECTS: 752870-

.PE:NONE ROW: NONE CST: NONE

PROJECT: 752880- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANT A TMA TIP # AT 164

LENGTH (miles1 km) 0.42 /0.68

DESCRPT: SR I 54/MEMORIAL DRIVE AT SR I 55/CANDLER ROAD

PE: 1997 ROW: 2000 CST: 2001 FED Share: GA Share:

. UNDERWAY $2,576,000 $225,000 $180,000 $45,000

PROJECT: 752900- TYPE WORK: REPLACE BRIDGE

FUND: STP

ATLANT A TMA TIP # DK 250 .

LENGTH (miles 1 km) 0.2 /0.32

( DESCRPT: SR I 55/CANDLER RD AT SHOAL CKJREPL CL VT;TRN LN&REMOVE PED BR

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1996 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $744,000 $670,000 $536,000 $134,000

PROJECT: 752930- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

. PE: 1999

ATLANTA TMA TIP # DK 260

LENGTH (miles1 km) 0.2 /0.32

ROW:.LOCL

DESCRPT: BOULDERCREST ROAD AT THE SOUTH RIVER SOUTH OF 1-285

CST: 2001

FED Share:

GA Share:

UNDERWAY
$1,528,000 $1,222,400
$305,600

PROJECT: 752940- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # DK 258

LENGTH (miles / km) 0.2/0.32

ROW: LOCL

DESCRPT: CR 5 194/FLAT SHOALS ROAD @ DOLITTLE CREEK JUST SOUTH OF 1-20

CST: 2002

FED Share:

. GA Share:

UNDERWAY
$633,000 $506,400 $126,600

{ ::; :~!
~';:':.

PROJECT: 752950- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # DK 259'

LENGTH (mileslkm) 0.21/0.34

ROW: LOCL

DESCRPT: CR 3271/MERCER UNIV. DRIVE @ N FORK PEACHTREE CREEK

CST: 2002

FED Share:

GA Shure:

UNDERWAY'
$404,000 $323,200
$80,800

Page 114 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00
_ _ _ _ - . - - - - - - - - - - - - - - - - - - - - - - - - -_ _ _ _. _ .



....--,

DEKALB COUNTY

PROJECT: 753030- TYPE WORK: TURN LANES

ATLANTA TMA TIP # DK 261

LENGTH (miles / km)

DESCRPT: PANOLA RD/CR 5150 AT ROCK SPRINGS RD

FUND: STP 0.2 /0.32

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 753035- TYPE WORK: TURN LANES

ATLANT A TMA TIP # DK 246

LENGTH (miles / km)

DESCRPT: EAST PONCE DE LEON/CR 5151 AT HAMBRICK RD

FUND: STP 0.2 /0.32

OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

PROJECT: 753045- TYPE WORK: TURN LANES

FUND: STP

ATLANTATMA T1P# DK239

LENGTH (miles/km) 0.2/0.32

DESCRPT: TILLY MILL W/CR 1698 AT NORTH PEACHTReE/PEELER RD

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 753170- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: HPP

ATLANT A TMA TIP # DK 268

LENGTH (miles / km) 0/0.00

DESCRPT: SR I55/CANDLER ROAD MAJOR ARTERIAL ENHANCEMENTS

OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

';.'
:
:~~".I' PROJECT: 753200- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: HPP

ATLANTA TMA TIP # DK 267

LENGTH (miles / km) 0/0.00

DESCRPT: SR I 54/SR 10/MEMORIAL DRIVE MAJOR ARTERIAL ENHANCEMENTS

OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

PROJECT: 753265- TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # DK 273

LENGTH (miles / km)

DESCRPT: EAST PONCE DE LEON AVE @ MCCLENDON DR

FUND: STP 0/0.00

OTH Share:
PE: LOCL ROW: LOCL CST: 2003 FED Share:

PROJECT: 753290- TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # DK 274

LENGTH (miles / km)

DESCRPT: SR 236/LAVISTA RD AT BRIARCLIFF RD/CR 1532

FUND: STP 0.2 /0.32

OTHShare:
PE:LOCL ROW: LOCL CST: 2003 FED Share:

OTH Share:

.
IteJ

PROJECT: 76247X- TYPE WORK: VEHICLE PURCHASES

FUND: CMAQ

ATLANTA TMA TIP # M AR 237B

LENGTH (miles / km) 0/0.00

DESCRPT: MARTA INTELLIGENT TRANS SYSTEM(FLEET AVLS)ISEE FULTON 762472

ASSOCIATED PROJECTS: 762472-

PE:NONE ROW: NONE CST: NONE

'0'41:.'"
$450,000 $360,000
$90,000 UNDERWAY
$900,000 $720,000 $180,000
$600,000 $480,000 $120,000 UNDERWAY $10,146,000 $8,117,000 $2,029,000 UNDERWAY $10,885,000 $8,708,000 $2,177,000
$75,000 $60,000 $15,000
$75,000 $60,000 $15,000

Page 115 0/336

STATE TMNSPORTATIONIMPROVEMENTPROGRAM
9/21/00

DEKALB COUNTY

PROJECT: 762500- TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # DK AR BP022

LENGTH (miles I km)

DESCRPT: TILLY MILL RD FM MT VERNON TO PEELER RD

FUND: STP 010.00

PE: 1999 ROW: LOCL CST: 2001 FED Share:

UNDERWAY
$880,000 $704,000

PROJECT: 762502- TYPE WORK: SIDEWALKS

ATLANT A TMA TIP # DK AR BP021

LENGTH (miles I km)

DESCRPT: SR 260/GLENWOOD AVE FM 1-20 TO EAST LAKE RD

FUND: STP 010.00

OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

$176,000 UNDERWAY
$510,000 $408,000

OTHShare:

PROJECT: 762611- TYPE WORK: SIDEWALKS

FUND: CMAQ

PE:LOCL

ATLANTA TMA TIP # DK AR BP038

LENGTH (miles I km) 2.5 14.03

ROW: LOCL

DESCRPT: PERIMETER AREA AROUND DUNWOODY MA~TA' STATION

CST: 2001

FED Share:

$1'02,000 .
$500,000 $400,000

OTHShare:

PROJECT: 770911- TYPE WORK: SIDEWALKS

FUND:CMAQ

PE: 1995

ATLANTA TMA TIP # DK AR 165CDE

. LENGTH (miles I km) 3.99 16.42

ROW: NONE

DESCRPT:

SIDEWALKS AT BUFORD HWY- NEW

PEACHTREE RD. &.

SHALLOWFORD RD.

'

CST: 2001
.

FED Share:

$100,000 UNDERWAY
$316,000 $253,000

OTHShare:

PROJECT: 770912- TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # DK AR 165AB

LENGTH (miles I km)

DESCRPT: SIDEWALKS AT BRIAR WOOD ROAD & DRESDEN ROAD

FUND: CMAQ

PE: 1995

1.21 11.95

ROW: NONE

CST: 2001

FED Share:

$63,000 UNpERWAY
$96,000 $77,000

OTH Share:

$19,000

PROJECT: 771170- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # DK f55

LENGTH (miles I km) 0.21 10.34

ROW:LOCL .

DESCRPT: CR 1644/BRIARWOOD ROAD @NORTH FORK P'TREE CREEK N OF 1-85

CST: 2002

FED Share:

GA Share:

UNDERWAY
$350,000 $280,000
$70,000

PROJECT: 771180- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # DK 256

LENGTH (miles I km) 0.19 10.31

ROW: LOCL

DESCRPT: CR 164/ELLINGWOOD DRIVE @CONLEY CREEK NEAR PANTHERSVILLE RD

CST: 2002

.FED Share:

GA Share:

UNDERWAY
$187,000 $149,600 $37,400

PROJECT: 771190-. TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # DK 257

LENGTH (mileslkm) 0.21/0.34

ROW: LOCL

DESCRPT: CR 1563/FLOWERS ROAD @ NORTH FORK P'TREE CREEK NEAR MERCER U

CST: 2002

FED Share:

GA Share:

UNDERWAY
$429,000 $343,200
$85,800

Page 116 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

- - - , - - - - - - - - - - - - - - - - - - - - --""~._""-------------------

9/21/00

DEKALB COUNTY

PROJECT: 771222- TYPE WORK: LANDSCAPING

FUND: STP

ATLANTA TMA TIP # OK 262

LENGTH (miles /km) 1.89/3.04

PE:LOCL ROW: LOCL

DESCRPT: CHAMBLEE-DUNWOODY RD FROM NEW P'TREE RD TO BUFORD HWY/SR 13

CST: 2001

FED Share:

$1,250,000 $1,000,000

OTH Share:

PROJECT: 771224- TyPE WORK: LANDSCAPING

ATLANTA TMA TIP # OK 264

LENGTH (miles r km)

FUND: STP 0/0.00

DESCRPT: DOWNTOWN DECATUR STREETSCAPES & SIDEWALKS PHASE II

ASSOCIATED PROJECTS: 0000177

PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:

PROJECT: 7V7043- TYPE WORK: CAPITAL

ATLANTA TMA TIP # OK 2 IOD

LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$250,000
$1,250,000 $1,000,000
$250,000
$105,000 $105,000
$27,000

PROJECT: MOOOl76 TYPE WORK: RESURFACE & MAINTENANCE

ATLANTA TMA TIP # AR 130H

LENGTH (miles / km)

DESCRPT: SR 155 FM SNAPFINGER ROAD TO MEMORIAL DR

LUMP SUM PROJECT

FUND: STP 4.22/6.79

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$2,714,000 $2,171,200
$542,800

PROJECT: TOOOOI3 TYPE WORK: CAPITAL

ATLANTA TMA TIP # OK 21 OD

LENGTH (miles / km)

DESCRPT: FY 2002 DEKALB COUNTY SECTION 5310

FUND: T.RANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$110,000 $110,000 $28,000

PROJECT: T000023 TYPE WORK: CAPITAL

ATLANTA TMA TIP # DK 2 I 00

LENGTH (miles / km)

DESCRPT: FY 2003 DEKALB COUNTY SECTION 5310

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$116,000 $116,000
$29,000

Page 117 0/336

......... _~t4

3

_ _ ...

,

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _._",r

WoI_>t.>_. 9/21/00
""',.,"""" _ _e-e

,"'

"''-,

*'_ _,_ _

DODGE COUNTY

PROJECT: 221960- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 8.4 /13.52

DESCRPT: SR 27 FM CHAUNCEY E CL TO HELENA WEST CUfELFAIR.CO-22196X

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS.: 22196X-

PE: 1993 ROW: 1996 CST: 2001
GA Share:

, UNDERWAY UNDERWAY $14,963,000
$14,963,000

PROJECT: 222410- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 12.6/20.30

DESCRPT: SR 87/US 23 FM CR 332/EASTMAN TO SR 257/FRAZIER (EXCEPTION)

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1996 ROW: 2001 eST:

UNDERWAY $4,084,000 AFTER 2003

PROJECT: 245355-TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) . 0.23/0.37

DESCRPT: SR 87/EASTMAN-RHINE HWY @ SUGAR CREEK 1.8 MI S OF EASTMAN

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,0.00
AFTER 2003

PROJECT: 26206Z- TYPE WORK: WIDENING LENGTH (miles / km)

FUND: STATE 0/0.00

DESCRPT: SR 31/US 441 FM N/CR 132 THRU DODGE TO SR 46/WHEELER-262061

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 262061-

.~.

PE.NONE ROW: NONE eST: NONE

PROJECT: 271306- .TYPE WORK: LANDSCAPING

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: DOWNTOWN EASTMAN LANDSCAPING AND STREETS CAPE

PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

$632,000 $506,000
$126,000

~~ .
~~':.;,-_:..'

Page 1/80/336

"_ _'

STATE TRANSPORTATioNiMPROVEMENTPROGRAM

__ 9/21/00

'

"''''-'~'''~_'''''''';O_'_'''~~_~~.

'_~

._,

DOOLY COUNTY
PROJECT: 0001123 TYPE WORK: RR XING LENGTH (miles I km)
DESCRPT: CR 326/COTTON ST IN VIENNA @ CSX # 638341J LUMP SUM PROJECT

FUND: STP 0 10.00

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

_
$100,000 $80,000. $20,000

PROJECT: 31 1665- TYPE WORK: BRIDGE REHAB LENGTH (miles I km)
DESCRPT: 1-75 WIDEN BRIDGE & RAMPS@SR27

FUND: 1M 0.510.81

PE: 1997 ROW: 2001 CST:

UNDERWAY $612,000
AFTER 2003

PROJECT: 333190- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (mileslkm) 0.22/0.35

DESCRPT: SR 27 @ PENNAHATCHEE CREEK WEST OF VIENNA

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page 119 0[336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

DOUGHERTY COUNTY

PROJECT: 0000522 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ALBANY TIP # TSM-8

LENGTH (miles I km) 0.510.81

DESCRPT: SR 133 AT COUNTY LINE ROAD/CR 459 AT WORTH COUNTY LINE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 00005X2

PE: 2001 ROW: CST:

$90,000 AFTER 2003 AFTER 2003

PROJECT: 422550- TYPE WORK: INTERCHANGE

FUND: NHS

ALBANY TIP # NHS-2

LENGTH (miles I km) 0.510.81

DESCRPT: SR 3/LIBERTY EXWY @ SR 91 & N.JEFFERSON INTERCHANGE RAMPS

EXIST. LANES: 01 PROPOSED LANES: 04

PE: 1999 ROW: 2002 CST: 2002 FED Share: GA Share:

UNDERWAY $150,000
$2,178,000 $1,742,400
$435,600

PROJECT: 422560-, TYPE WORK: RAMP

FUND:NHS

ALBANY TIP # NHS-4

; LENGTH (miles I km) . 0.2 10.32

DESCRPT: SR 3/LIBERTY PKWY @ CLARK AVE - RAMPS & TURN LANES/ALBANY

EXIST. LANES; 01 PROPOSED LANES: 04

PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:

UNDERWAY
$234,000 $187,200
$46,800

PROJECT: 422570- TYPE WORK: INTERCHANGE

FUND: NHS

ALBANY TIP # NHS-3

LENGTH (miles I km) 0.5 10.81

DESCRPT: SR 3ILIBERTY EXWY @ NB & SB RAMPS AT SR I33IMOUL TRIE RD

PE: 1999 ROW: 2002 CST: 2002 FED Share: GA Share:

UNDERWAY $150,000 $650,000 $520,000 $130,000

PROJECT: 422670- TYPE WORK: ATMS/ITS

ALBANY TIP # NHS-5

LENGTH (miles I km)

DESCRPT: ATMS/ ALBANY SLO SCAN/CMS/RADAR

FUND: NHS 010.00

PE: NONE ROW: NONE CST: 2003 FED Share: GA Share:

$1,650,0'00 $1,320,000
$330,000

PROJECT: 431740- TYPE WORK: WIDENING

FUND: STP

ALBANY TIP # HlR-99-6

LENGTH (miles I km) 1.3 12.09

DESCRPT: SLAPPEY BL VD/SR 62 & SR 520BU FM COLQUITT AVE N TO TIFT AVE

EXIST. LANES; 04 PROPOSED LANES: 06

PE:2002 ROW: CST:

$168,000 AFTER 2003 AFTER 2003

PROJECT: 432125- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

ALBANY TIP #

LENGTH (mileslkm) 0.23/0.37

DESCRPT: SR 133 SBL @ GA-FLA RAILNET INC ALBANY - SE SECTION

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 450490- TYPE WORK: WIDENING

FUND: STP

ALBANYTIP#HlR-95-6

LENGTH (miles I km) 2.17/3.49

DESCRPT: SR 234/GILLIONVILLE RD FM EIGHT MILE RD TO LOCKETT STATION

EXIST. LANES; 02 PROPOSED LANES: 04

PE: 1997 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$6,653,000 $5,322,400 $1,330,600

Page 120 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

DOUGHERTY COUNTY

PROJECT: 450495- TYPE WORK: WIDENING

FUND: STP

ALBANY TIP # HIR-95-5

LENGTH (miles / km) 1.3 12.09

DESCRPT: SR 234/GILLIONVILLE RD FM LOCKETT STATION RD TO BEATTIE RD

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1996 ROW: LOCL CST: 2001 FED Shure: GA Shure:

UNDERWAY
$2,904,000 $2,323',200
$580,800

PROJECT: 4D4030- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

ALBANY TIP #

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: FACILITY MODIFICATION; TRANSIT COACH; PARATRANSIT VEHICLES;

CST: 2001

FED Shure:

GA Share:

OTH Shure:

PROJECT: 4D4031- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

ALBANY TIP #

LENGTH (miles / km) 0 /0.00

ROW: NONE

DESCRPT: TRANSIT COACH LEASE; PARATRANSIT VEHICLES; BICYCLE RACKS

CST: 2001

FED Share:

GA Shure:

OTH Shure:

PROJECT: 4D4032- TYPE WORK: OPERATING

ALBANY TIP #

LENGTH (miles / km)

DESCRPT: TRANSIT OPERATING ASSISTANCE FOR FY 2001

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

OTH Shure:

PROJECT: 4D4033- TYPE WORK: CAPITAL

ALBANY TIP #

LENGTH (miles / km)

DESCRPT: TRANSIT COACHES

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002

FED Shure:

GA Shure:

OTH Shure:

PROJECT: 4D4034- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

ALBANY TIP #

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: TRANSIT COACH LEASE; PARA TRANSIT VEHICLES; CAPITAL MAINT.

CST: 2002

FED Share:

GA Shure:

OTH Share:

PROJECT: 4D4035- TYPE WORK: OPERATING

ALBANY TIP #

LENGTH (miles / km)

DESCRPT: TRANSIT OPERATING ASSISTANCE FOR FY 2002

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

,.-(;
;;:~~.~:

PROJECT: 4V7015- TYPE WORK: CAPITAL

ALBANY TIP #

LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$3,645,000 $3,240,000
$405,000 $405,000
$442,000 $393,000
$49,000 $49,000
$1,399,000 $363,000
$1,036,000
$495,000 $440,000
$55,000 $55,000
$375,000 $333,000
$42,000 $42,000
$1,399,000 $369,000
$1,030,000
$22,000 $22,000
$5,000

Page 1210[336

__ --_. . _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
STATE TRANSPORTATION IMPROVEMENT PROGRAM

9121100
._--------_._------~--,-----_.

-

DOUGHERTY COUNTY

PROJECT: 4V7016- TYPE WORK: CAPITAL

ALBANY TIP #

LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$23,000 $23,000
$5,000

PROJECT: TOOOl18 TYPE WORK: . CAPITAL

ALBANY TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 ALBANY SECTION 5307 CAPITAL

PROJECT: TOOOl19 TYPE WORK: CAPITAL

ALBANY TIP #

LENGTH (mile~/km)

DESCRPT: FY 2003 ALBANY SECTION 5309 CAPITAL

PROJECT: TOOOl20 TYPE WORK: CAPITAL

ALBANY TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 ALBANY SECTION 5310 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

)FEDShare:

GA Share:

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

.FED Share:

GA Share:

OTHShare:

FUND: TRANSIT

PE: 1'JONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

. . :...,. ' PROJECT: TOOOl2I TYPE WORK: ,OPERATING

ALBANY TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 ALBANY SECTION 5307 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

OTHShare:

$439,000 $390,000 $49,000 $49,000
$743,000 $660,000
$83,000. $83,000
$24,000 $24,000
$6,000
$1,399,000 $363,000
$1,036,000

~. . ,
~~.~~:

Page J 22 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

-

_ .., , _,_9o/2._1../..0..0.



_

DOUGLAS COUNTY

PROJECT: 0000245 TYPE WORK: BRIDGE REHAB

FUND: DEMO

ATLANTA TMA TIP # DO 0 I 7C I

LENGTH (miles I km) 0.65 11.05

DESCRPT: SR 61 CONN/LIBERTY ROAD FM 120 TO PUNKINTOWN RD REALIGNMENT

ASSOCIATED PROJECTS: 00Y0245

PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$500,000 $400,000 $100,000

PROJECT: 0000333 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # DO 281

LENGTH (mileslkm) 0.5/0.81

DESCRPT: SR 92/DALLAS HIGHWAY AT THOMPSON STREETICR 519

PE:LOCL ROW: LOCL CST: 2003 FED Share:

PROJECT: 0000424 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

.ATLANTA TMA TIP # AR 157

LENGTH (miles I km) 0.2 10.32

DESCRPT: SR 5/BANKHEAD HWYIBILL ARP RD AT ROSE AVENUE/CS 573

LUMP SUM PROJECT

OTH Share:
PE: 2000 ROW: LOCL CST: 2001 FED Share: GA Share:

$95,000 $76,000
$19,000
UNDERWAY
$1,088,000 $979,200 $108,800

PROJECT: 0000632 TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: LOCL.

ATLANTA TMA TIP # DO AR BPO17

LENGTH (miles I km) 0 10.00

ROW: LOCL

DESCRPT: FAIRBURN RD SIDEWALKS FM BANKHEAD HWY TO HOSPITAL DR

CST: 2003

FED Share:

OTH Share:

PROJECT: 0000633 TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # DO AR BP053

LENGTH (miles I km)

DESCRPT: MALONE ST SIDEWALKS FM E. STRICKLAND TO BROWN

FUND: CMAQ 0.5/0.81

PE: LOCL ROW: LOCL CST: 2003 FED Share:

OTH Share:

PROJECT: 0000634 TYPE WORK: SIDEWALKS

FUND: CMAQ

PE:LOCL

ATLANTA TMA TIP # DO AR BP054

LENGTH (miles I km) 0.5 10.81

ROW: LOCL

DESCRPT: ROSE AVE SIDEWALKS FM SALMEN DR TO CONCOURSE PKWY

CST: 2003

FED Share:

OTH Share:

PROJECT: 0000635 TYPE WORK: SIDEWALKS

FUND: CMAQ

ATLANTA TMA TIP # DO AR BP061

LENGTH (miles I km) 0.9 I 1.45

DESCRPT: DOUGLAS BL VD SIDEWALKS W. FM BILL ARP/SR 5 TO BRIGHT STAR RD

PE: LOCL ROW: LOCL CST: 2003 FED Share:

OTH Share:

f -".~
li?

PROJECT: 0000636 TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP# DOARBP062

LENGTH (mileslkm) 0.37/0.60

ROW: LOCL

DESCRPT: CHAPEL HILL RD SIDEWALKS FM 120 TO RESERVOIR DR

CST: 2003

FED Share:

OTHShare:

$79,000 $63,000 $16,000
$63,000 $50,000 $13,000
$197,000 $158,000 $39,000
$98,000 $78,000 $20,000
$37,000 $30,000
$7,000

Page 123 of336

STATE TRANSPORTATIONIMPROVEMENTPROGRAM

_,_. 9121100 ---~--_.....

_._._._-----"'''_......-_'"'''''''''''''.,.'''-~~--,---- " ' - - - " ,...

DOUGLAS COUNTY

PROJECT: 00Y0245 TYPE WORK: WIDENING

FUND: STP

PE: 1995

UNDERWAY

~

ATLANTA TMA TIP # DO 017C2

. LENGTH (miles / km) 0.65/1.05

ROW: LOCL

DESCRPT: SR 61 CONN FM 120 TO PUNKINTOWN RD - FOR Q24 $; SEE 0000245

CST: 2001

$2,778,000

FED Share:

$2,222,400

ASSOCIATED PROJECTS: 0000245

GA Share:

$555,600

PROJECT: 713490- TYPE WORK: NEW CONSTRUCTION

FUND: STP

ATLANTA TMA TIP # DO 017 A

LENGTH (miles / km) 0.08 /0.13

DESCRPT: 1-20 @SR 61 CONN/LIBERTY ROAD INTERCHANGE RECONSTRUCTION

PE: 1~95 ROW: LOCL CST: 2003 FED Share: GA Share:

PROJECT: 721590- TYPE WORK: WIDENING

FUND: STP

ATLANTA TMA TIP # DO 029A

LENGTH (miles /Rm) 5.88/9.47

DESCRPT: SR 5&8/US 78/BANKHEAD FM SR 92 E TO CR IS/SWEETWATER RD

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 72Y590-

PE: 1992 ROW: 2003 CST:

UNDERWAY
$3,800,000 $3,040,000
$760,000
, UNDERWAY
$8,000,000 AFTER 2003

PROJECT: 721770- TYPE WORK: WIDENING

FUND: STP

ATLANTATMATIP#DOOI9

LENGTH (miJes/km) 2.91/4.69

DESCRPT: SR 166 FM OLD LOWER RIVER RD/DOUGLAS TO SR 70IFULTON CO

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 72 I77X-

PE: 1992 ROW: 2003 CST:

UNDERWAY $4,100,000 AFTER 2003

PROJECT: 72Y590- TYPE WORK: WIDENING

FUND: STP

ATLANTA TMA TIP.# DO 029B

LENGTH (miles / km) 5.88/9.47

DESCRPT: SR 5&8/US 78/BANKHEAD HW FM SR 92 TO CR 15/SWEETWATERIADD RW

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 721590-

PE:NONE ROW: 2003 CST: NONE.

$11,637,000

PROJECT: 731800- TYPE WORK: SIGNALS

ATLANTA TMA TIP # DO 257

LENGTH (miles / km)

DESCRPT: BILL ARP RD/SR 5 AT WESLEY POND RD

FUND: STP 0.2 /0.32

PE:LOCL ROW: LOCL CS,T: 2001 FED Share:

PROJECT: 731810- TYPE WORK: SIGNALS .

ATLANTA TMA TIP # DO 264

LENGTH (miles / km)

DESCRPT: DALLAS HWY/SR 92 AT UPSHAW MILL RD

FUND:STP 0.2/0.32

OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

(.

l



ti~~~~:

PROJECT: 731825- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # DO 265

LENGTH (miles / km) 0.42 /0.68

DESCRPT: SR 5 AT SR 92 REALIGN AND IMPROVE SIGNALIZATION

OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
OTHShare:

$142,000 $114,000
$28,000
$60,000 $48,000 $12,000 UNDERWAY $225,000 $180,000 $45,000

Page 124 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

----_ - 9/21/00

....... . ,. .._-----~---_ _-~---

DOUGLAS COUNTY

:

PROJECT: 753090- TYPE WORK: SIGNALS

FUND: STP

PE:LOCL

ATLANTA TMA TIP # DO 267

LENGTH (miles / km) 0.42 /0.68

ROW: LOCL

DESCRPT: DOUGLAS BOULEYARD AT STEW ART PARK WAY--SIGNALS

CST: 2001

$60,000

FED Share:

$48,000

PROJECT: 753095- TYPE WORK: TURN LANES

FUND: STP

ATLANT A TMA TIP # DO 258

LENGTH (miles I km) 0.2 10.32

DESCRPT: LEE RD/CR 817 AT EAST COUNTY UNE RD & SIDEWALKS

OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

$12,000 UNDERWAY
$90,000 $72,000

PROJECT: 753100- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # DO 262

LENGTH (miles / km) 0.2 10.32

DESCRPT: CENTRAL CHURCH RD/CR 173 AT KINGS HIGHWAY/CR 810

OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

$18,000 UNDERWAY
$100,000 $80,000

PROJECT: 753105- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # DO 268

LENGTH (miles I km) 0.2 /0.32

DESCRPT: CENTRAL CHURCH RD AT YANCEY RD/COURSEY LAKE RDIREALIGN

OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

$20,000 UNDERWAY
$90,000 $72,000

PROJECT: 753110- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # DO 266

LENGTH (miles / km) 0.2/0.32

DESCRPT: CHAPEL HILL RD/CR 812 AT WEST CHAPEL HILL RD/CR 145

OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

$18,000 UNDERWAY
$90,000 $72,000

PROJECT: 753295- .TYPE WORK: REPLACE BRIDGE

FUND: STP

ATLANTA TMA TIP # DO 275

LENGTH (miles / km) 0.42/0.68

DESCRPT: ANNEEWAKEE RD/CR 815 BRIDGE @ ANNEEW AKEE CREEK

OTHShare:
PE:LOCL ROW: 2001 CST: 2001 FED Share:

$18,000
$20,000 $1,000,000
$800,000

PROJECT: 762385- TYPE WORK: WIDENING

FUND: STP

ATLANTA TMA TIP # DO 0 17B1

LENGTH (miles / km) 0.65 11.05

DESCRPT: SR 61 CONN/UBERTY ROAD FM 1-20 TO PUNKINTOWN ROAD

EXIST. LANES: 02 PROPOSED LANES: 04

OTH Share:
PE: 1995 ROW: LOCL CST: 2003 FED Share: GA Share:

$200,000
UNDERWAY
$6,400,000 $5,120,000 $1,280,000

PROJECT: 762510- TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: 1995

ATLANTA TMA TIP # DO AR BP048A

LENGTH (mileslkm) 010.00

ROW: LOCL

DESCRPT: SIDEWALKS: EAST COUNTY LINE RD FM MACK RD 1'0 LEE ROAD

CST: 2001

FED Share:

OTH Share:

UNDERWAY
$163,000 $130,000
$33,000

Page 125 0/336

STATE

TRANSPORTATI.ON

IMPROVEMENT .

PRO.GRAM

..-_-----,..._--------

9/21/00

DOUGLAS COUNTY

PROJECT: 770163- TYPE WORK: REPLACE BRIDGE

ATLANTA TMA TIP #. DO 274

LENGTH (miles / km)

DESCRPT: POST RO/CR 808 BRIDGE @ DOG RIVER

FUND: STP 0.2 /0.32

PE:LOCL ROW: 2001 . CST: 2002 FED Share:

OTH Share:

PROJECT: 771124- TYPE WORK: SIDEWALKS

ATLANTA TMA TIP #. DO AR 1770

LENGTH (miles / km)

DESCRPT: SIDEWALKS IN OOUGLASVILLE-PRESTLEY MILL ROAD

FUND: CMAQ

PE:LOCL

0.28 /0.45

ROW: LOCL

CST: 2001

FED Share:

OTH Share:

PROJECT: 707552- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

ATLANT A TMA TIP #. DO 211C

LENGTH (miles / km} 0 /0.00

ROW: NONE

DESCRPT: TRANSIT CAPITAL (SECTION 5307) ASSISTANCE FOR.FY 2001

CST: 2001

FED Share:

GA Share:

OTHShare:

PROJECT: 707554- TYPE WORK: CAPITAL

ATLANTA TMA TIP #. DO 211C

LENGTH (miles / km)

DESCRPT: TRANSIT CAPITAL ITEMS

FUND: TRANSll

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTHShare:

PR. OJECT:. 7V7044- TYPE WORK: CAPIT.AL

ATLANTA TMA TIP #. DO 2130

. LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$20,000 $1,000,000
$800,000 $200,000
$84,000 $67,000 $17,000
$1,404,000 $1,248,000
$46,000 $156,000
$445,000 $395,000 $50,000 $50,000
$12,000 $12,000
$3,000

PROJECT: TOOOOl4 TYPE WORK:CAPJ:rAL

ATLANTA TMA TIP #. DO 2130

LENGTH (miles / km)

DESCRPT:FY 2002 DOUGLAS COUNTY SECTION 5310

,,

PROJECT: T000024 TYPE WORK: CAPITAL

ATLANTA TMA TIP #. DO 2130

LENGTH (miles / km)

DESCRPT: FY 2003 DOUGLAS COUNTY SECTION 5310

FUND: TRANSIT

PE."NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 200~

FED Share:

GA Share:

$12,000 $12,000 $3,000
$13,000 $13,000
$3,000

. PROJECT: T000040 TYPE WORK: CAPITAL

ATLANTA TMA TIP #. DO 211C

LENGTH (miles / km)

DESCRPT: FY 2003 DOUGLAS COUNTY CAPITAL SECTION 5307

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

"

$394,000

$350,000

"

$44,000

$44,000

Page 126 of336

_ _ _,_.

STATE TRANSPORTATION IMPROVEMENTPROGRAM

"""""'"

.I,

9/21/00
~_."'-~----------_._-_ ....._ - _...~ _ _ y

EARLY COUNTY

PROJECT: 0000352 TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 1.3 /2.09

DESCRPT: SR 38/US 84 FROM ALABAMA LINE TO SR 370 INCLUDING RIVER BR

EXIST. LANES: 02 PROPOSED LANES: 04

PE:2001 ROW: CST:

$500,000 AFTER 2003 AFTER 2003

PROJECT: 0000353 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.26/0.42

DESCRPT: SR 38/US 84 @ CHAITAHOOCHEE RIVER OIF @ MP .30 WEST OF JAKIN

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2001 ROW: NONE CST:

$230,000 AFTER 2003

PROJECT: 0000354 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.25 /0.40

DESCRPT: SR 38/US 84 @ CHAITAHOOCHEE RIVER AT MP 1.00 WEST OF JAKIN

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2001 ROW: NONE CST:

$180,000 AFTER 2003

PROJECT: 422215- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 7.3/11.75

DESCRPT: SR IIUS 27 FM CR 279/DAMASCUS-HILTON RD TO BLAKELY BYPASS

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 431320- 42Y215-

PE: 1996 ROW: 2002 CST:

UNDERWAY $3,885,000 AFTER 2003

PROJECT: 422220- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 7.15/11.51

DESCRPT: SR IIUS 27 FR BLAKELY BYPASS TO CLAY COUNTY LINE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 42Y220-

PE: 1993 ROW: 2001 CST:

UNDERWAY $1,275,000 AFTER 2003

PROJECT: 431320- TYPE WORK: REPLACE BRIDGE LENGTH (miles-s' km)
DESCRPT: SR lOVER BLUE CREEK TRIB
ASSOCIATED PROJECTS: 422215-

FUND: BRIDGE

PE: 1994

0.75/ 1.21

ROW: NONE

CST: 2003

FEDShare:

GA Share:

UNDERWAY
$369,000 $295,200
$73,800

~
l:~
Page J27 of336

STATE TRA, N_. SPORTATI- ON IMPRO. VEMENT PROGRAM
9/21/00

ECHOLS COUNTY

PROJECT: 42Y 420- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km)

0/0.00

DESCRPT: SR 89IUS 441 FROM FLA TO CR 8 IN CLINCH - FOR FED PE; 422420

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIA TED PROJECTS: 422420-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 442985- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 135 @ LITTLE RIVER APP 5 MI S OF JCT SR 376

FUND: BRIDGE 0.26 /0.42

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 442986- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 94 @ TOMS CREEK APP 10.3 MI E OF JCT SR I I

FUND: BRIDGE 0.23 /0.37

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PE: 2001 ROW: LOCL CST: 2003 . FED Share: GA Share:

$33,000
$325,000 $260,000
$65,000

.;. ~:;_.>~.,;

Page 128 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
_- - - - - - - - - - ' - , - - - - - - - -9/-21/0-0 _...~ .. ~--_.-,_.......

EFFINGHAM COUNTY
PROJECT: 0000073 TYPE WORK: BICYCLE/PED, FACILITY LENGTH (miles / km)
DESCRPT: EBENEZER BIKEIPED. TRAIL

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000269 TYPE WORK: PRELIMINARY ENGINEERING

FUND: STP

LENGTH (miles / km) 0.25 /0.40

DESCRPT: SR 119 STUDY ROADWAY LOWERING AT RR CROSSING IN SPRINGFIELD

OTH Share:
PE: 2001 ROW: NONE CST: NONE

$500,000 $400,000
$100,000 $100,000

PROJECT: 222270- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles/ km) 10.2/16.39

DESCRPT: SR 21 FM N OF CR 39 TO CR 255 IN SCREVEN COUNTY & 22R270

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 22227X- 22R270-

PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $3,145,000
$14,570,000 $11,656,000
$2,914,000

PROJECT: 22R270- TYPE WORK: WIDENING

FUND: HPP

LENGTH (miles / km) 10.2 / 16.39

DESCRPT: SR 21 FM N OF CR 39 TO CR 255/SCREVEN - FOR HPP $1 222270

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 222270-

PE: 1993 . ROW: NONE CST: 2003 FED Share: GA Share:

UNDERWAY
$3,230,000 $2,584,000
$646,000

PROJECT: 521702- TYPE WORK: BARRIERS

FUND: STATE

LENGTH (miles / km) 0/0.00

DESCRPT: SR 2'I-CONSTRUCTION OF A NOISE WALL FOR SPRINGFIELD BYPASS

PE: 1993 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 522170- .TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 2.6/4.19

DESCRPT: SR 17&261US 80 fM SR 17 TO CHERRY ST IN BLOOMINGDALE/CHATHAM

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 52217X-

PE: 1993 ROW: 1998 CST: 2002 FED Share: GA Share:

UNDERWAY UNDERWAY $4,156,000 $3,324,800
$831,200

PROJECT: 571408- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: MULTI-USE TRAIL IN SPRINGFIELD

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

..
t
~t~;'

OTH Share:

PROJECT: 571450- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

.

LENGTH (miles / km) 0.23/0.37

ROW: LOCL

DESCRPT: CR 183/LOG LANDING ROAD @ EBENEZER CREEK 4 MI "N OF RINCON

CST: 2002

FED Share:

GA Share:

$802,000 $642,000
$160,000
UNDERWAY
$584,000 $467,200 $116,800

Page 119 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

.....- - - - - ~ - - - - - - - - ~ - -

9/il/OO

_.o_.

._

EFFINGHAM COUNTY
PROJECT: M000343 TYPE WORK: SHOULDER WORK LENGTH (miles / km)
DESCRPT: SR 17 FM SR 30/US 17 TO N OF SR 119 LUMP SUM PROJECT

FUND: STP 10.1 /16.21

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$782,000 $625,600 $156,400

Page 130 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

- _.. __-,--_._----_., .. _----------~--_.....

9/21/00

--"_._~._._-----_.

ELBERT COUNTY

PROJECT: 0000680 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.21 10.34

DESCRPT: CR 37/ELIAM ROAD@WAHACHEECREEK5 MI S OF MIDDLETON

PE:2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 0000681 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.21 10.34

DESCRPT: CR 84/ED WEBB ROAD @ DOVE CREEK 6.5 MI W OF ELBERTON

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 0000682 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (mileslkm) 0.21/0.34

DESCRPT: CR I95/PEACHTREE ROAD@LITTLE COLDWATER CREEK N OF ELBERTON

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 12Y840- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles I km) 010.00

DESCRPT: SR 17 FROM NORTH OF CR 50 TO SO OF CR 367-FOR FED PEIJ22840

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 122840-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 132410- TYPE WORK: INTERCHANGE LENGTH (miles I km)
DESCRPT: SR 72/SR 17 INTERCHANGE JUST WEST OF ELBERTON EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STATE 0.58/0.93

PE: 1993 ROW: 1999 CST: 2001
GA Share:

UNDERWAY UNDERWAY
$7,468,000
$7,468,000

PROJECT: 132990- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.23/0.37

DESCRPT: SR 77@FALLING CREEK 6.1 MI S OF ELBERTON

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 142020- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles I km) 0.23/0.37

ROW: LOCL

. DESCRPT: CR 242/BREWERS BRIDGE RD @ BEAVERDAM CK 2.5 MI N OF ELBERTON

CST: 2001

FED Share:

GA Share:

UNDERWAY
$571,000 $456,800 $114,200

r
l~)
Page 131 of336

, ,

STATE

TRANSPORTATIO.N

IM. PROVEMENT

PROGRAM

-'--.-_ _-.~--:---~

_ _. 9/21/00
~-""'""""J=------.----------

_

EMANUEL COUNTY

PROJECT: 221900- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 2.2 13.54

DESCRPT: SR 4/US I FM SOUTH TO NORTH CTY LMTS IN OAK PARKINEW LOC

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 22Y900-

PE: 1993 ROW: 2001 CST:

UNDERWAY $1,109,000 AFTER 2003

PROJECT: 221910- TYPE WORK: WlpENING LENGTH (miles 1 km)
DESCRPT: SR 4/US I FROM NCL OAK PARK TO 1-16 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 22Y910-

FUND: STATE 2.3/3.70

PE: 1993 ROW: 2001 CST:

UNDERWAY $160,000
AFTER 2003

PROJECT: 222490- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 9.8/15.78

DESCRPT: SR 4/US I FM N. OF 1-16 NORTH TO SR 297@SWAINSBOROBYPASS

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 22Y490-

\

PROJECT: 222630- . TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles 1 km) 2.5 14.03

DESCRPT: SR 4/US I FM PROPOSED BYPASS N TO INJUNCTION RD IN SWAINSBOR

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 2001 CST:
PE:2001 ROW: CST:

UNDERWAY $2,593,000 AFTER 2003
$110,000 AFTER 2003 AFTER 2003

PROJECT: 231960- TYPE WORK: REPLACE BRIDGE

FUND: BRlDGE

LENGTH (miles 1 km) 0.74/1.19

DESCRPT: SR 56 (3) BRIDGES OVER OGEECHEE RVR & OVFL NE OF SUMMERTOWN .

PE: 1997 ROW: 2002 CST:

UNDERWAY $2,000
AFTER 2003

PROJECT: 231970- ToYPE WORK: BRIDGE REHAB

FUND: BRIDGE

LENGTH (miles r km) 0.23/0.37

DESCRPT: SR 57 OVER SARDIS CREEK 9.7 MILES NW OF SWAINSBORO

PE:1997 ROW: 2001 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 232010- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (mileslkm) 3.71/5.97

DESCRPT: SR 26- 2 LOC BETWEEN SWAINSBORO & TWIN CITY AND TURN LANE

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 2003 ROW: CST:

$170,000 AFTER 2003 AFTER 2003

PROJECT: 232325- TYPE WORK: REPLAc:E BRIDGE

FUND: BRIDGE

LENGTH (miles 1 km) 0.21 /0.34

DESCRPT: SR 26IUS 80 @ E FORK YAM GRANDY CK 2.2 MI SW OF SWAINSBORO

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

Page 132 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

__ ------ ------------_._--_._._-,--.

...... 9/21/00
._-_._._._~_._

EMANUEL COUNTY

PROJECT: 262390- TYPE WORK: NEW CONSTRUCTION

FUND: STATE

LENGTH (miles / km) 5.5/8.86

DESCRPT: N SWAINSBORO BYP FM SR 26/US 80 NW TO SR 4/US I NEAR CR 98

EXIST. LANES: 00 PROPOSED LANES: 02

ASSOCIATED PROJECTS: 262395-

PE: 1993 ROW: 1998 CST: 2001
GA Share:

UNDERWAY UNDERWAY $11,967,000
$11,967,000

PROJECT: 262395- TYPE WORK: NEW CONSTRUCTION LENGTH (miles / km)
DESCRPT: SR 4/SWAINSBORO S BYP FM S OF SR 297 NW TO US 80 EXIST. LANES: 00 PROPOSED LANES: 02 ASSOCIATED PROJECTS: 262390-

FUND: STATE 5/8.05

PE: 1993 ROW: 1998 CST: 2001

GA Share:'

UNDERWAY UNDERWAY $15,246,000
$15,246,000

PROJECT: 52213X- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 0/0.00

DESCRPT: SR 4/US I FM LYONS CLITOOMBS TO SOUTH CLiOAK PARK-SEE TOOMBS

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 522130-

PE:NONE ROW: NONE CST: NONE

~.\
L;~:'

Page J33 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

EVANS COUNTY

PROJECT: 0000074 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: CLAXTON PLANNING FOR MULTI-USE FACILITY AND LANDSCAPING

PE:LOCL ROW: LOCL CST: 2001 FED Share:

$S4,000 $67,000

OTH Share:

PROJECT: 522105- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 1.54/ 2AS

DESCRPT: SR 30/CLAXTON FM WEST CTY LMTS TO EAST CTY LMTS

EXIST. LANES: 02 PRQPOSED LANES: 05

PE: 2000 ROW: 2002 CST:

$17,000
"-UNDERWAY $2,436,000 AFTER 2003

Page 134 of336

-,--- ,---------------'--,,.---------------------STATE TRANSPORTATION IMPROVEMENT PROGRAM

...-~

9/21/00
1I'_ _ 1.._ .......-_... _ . _ ....._ .. .

.._ . .

li _ _,

_

FANNIN COUNTY

PROJECT: 62214Z- TYPE WORK: TURN LANES

FUND:NHS

LENGTH (mileslkm) 16,9/27.27

DESCRPT: SR515 FM 1-575 THRU GILMER TO TOTEHEROW RD/FANNINISEE PICKEN

ASSOCIATED PROJECTS: 622140-

PE:NONE ROW: NONE CST: NONE

PROJECT: 630870- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 60 FM CR 63 TO MINERAL BLUFF CL & MP 24.3-25.3 EXIST. LANES: 02 PROPOSED LANES: 03

FUND:STP 1.15/1.85

PE: 1999 ROW: 2002 CST:

UNDERWAY $18,000
AFTER 2003

PROJECT: 630872- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles 1 km) 9.4 /15.13

DESCRPT: SR 60/SR 60SP FM SR 2 TO NORTH CAROLINA/INC MINERAL BLUFF BP

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2002 ROW: CST:

$1,200,000 AFTER 2003 AFTER 2003

PROJECT: 642160- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles 1 km) 0.15/0.24

DESCRPT: SR 60 BRIDGE REPLACEMENT OVER COOPER'S CREEK

ASSOCIATED PROJECTS: 642165-

PE: 1995 ' ROW: 2001 CST:

UNDERWAY $7,000
AFTER 2003

PROJECT: 642165- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.15 /0.24

DESCRPT: SR 60 OVER SKEENAH CREEK & CHAPEL BRANCH {PIPE ONLY}

ASSOCIATED PROJECTS: 642160-

PE: 1995 ROW: 2001 CST:

UNDERWAY $7,000
AFTER 2003

PROJECT: 642280- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles / km) 0.22/0.35

ROW: LOCL

DESCRPT: CR 220/LOVING RD @ HEMPTOWN CREEK 1.5 MI NE OF MORGANTON

CST: 2001

FED Share:

GA Share:

UNDERWAY
$670,000 $536,000 $134,000

.'
~~;. ..
l:>
Page 135 0/336

... r--------------------~~.~'-.~.- -~~-----------~~~

STATE TRANSPORTATION IMPROVEMENT PROGRAM
.... 9/21/00
------------~------....;...---------_~----,-----

FAYETTE COUNTY

PROJECT: 0000093 TYPE WORK: SIDEWALKS

FUND: STP

ATLANT A TMA TIP # FA AR BP029

LENGTH (miles / km) 0/0.00

DESCRPT: PEACHTREE CITY HWY 54 EAST LANDSCAPE ENHANCEMENTS PHASE 3

PE:LOCL ROW: LOCL CST: 2001 FED Share:

$83,000 $66,000

PROJECT: 0000094 TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # FA AR BP030

LENGTH (miles / km)

DESCRPT: TYRONE ARROWOOD SIDEWALK PROJECT

FUND: STP 0/0.00

OTH Share: .
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$17,000
$89,000 $71,000

PROJECT: 0000095 TYPE WORK: SIDEWALKS

FUND: STP

ATLANTA TMA TIP # FA AR BP031

LENGTH (miles / km) 0/0.00

DESCRPT: FAYETTEVILLE CHURCH STREET PROJECT & LANDSCAPING

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$18,000
$239,000 $191,000

PROJECT: 0000096 TYPE WORK:BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FA AR BP032

LENGTH (miles / km)

DESCRPT: PEACHTREE CITY FLAT CREEK MULTI-USE BRIDGE

FUND:STP 0/0.00

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$48,000
$72,000 $58,000

OTH Share:

PROJECT: 322065- TYPE WORK: REPLACE BRIDGE

ATLANTA TMA TIP # FA 012

LENGTH (miles / km)

DESCRPT: SR 54 @ SCL RR

EXIST. LANES: 02 PROPOSED LANES: .04

ASSOCIA TED PROJECTS: 322060-

FUND: BRIDGE

PE: 1992

0.0 I /0.02

ROW: NONE

CST: 2003

FED Share:

GA Share:

$14,000
UNDERWAY
$871,000 $696,800 $174,200

PROJECT: 32206X- TYPE WORK: WIDENING

ATLANT A TMA TIP # CW 003

LENGTH (miles / km)

DESCRPT: SR 34/54 FM FISCHER CROSS RDS TO SR 74 1322060

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIA TED PROJECTS: 322060-

FUND:STP 0/0.00

PE:NONE ROW: NONE CST: NONE

PROJECT: 32206Z- TYPE WORK: BRIDGE REHAB

ATLANT A TMA TIP # CW 008

LENGTH (miles / km)

DESCRPT: SR 54@LINECREEK/SEECOWETACO-322063

ASSOCIATED PROJECTS: 322063-

FUND: BRIDGE 0/0.00

PE:NONE ROW: NONE CST: NONE

PROJECT: 332370- TYPE WORK: TURN LANES

FUND: STP

ATLANTA TMA TIP# FA 101

LENGTH (miles/km) 0.42/0.68

DESCRPT: SR 92 @ RIVERS ROAD AND WES~ BRIDGE ROAD - TURN LANES

f.
~::::;..;-~.

PE: 1996 ROW: 19LU CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$130,000 $117,000 $13,000

Page 136 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FAYETTE COUNTY

PROJECT: 332940- TYPE WORK: TURN LANES

ATLANTA TMA TIP # FA 107

LENGTH (miles I km)

DESCRPT: SR 54 AT JEFF DAVISIADD SIGNALS AND TURN LANES

FUND: STP 0.2 10.32

PE: LOCL ROW: 2001 CST: 2001 FED Share:

PROJECT: 332985- TYPE WORK: SIGNALS ATLANTA TMA TIP # FA 231 DESCRPT: SR 74 AT DOGWOOD TRAIL

LENGTH (miles I km)

FUND: STP 0.2 10.32

OTHShare:
PE:LOCL ROW: 2001 CST: 2001 FED Share:

PROJECT: 332990- TYPE WORK: SIGNALS ATLANTA TMA TIP # FA 227 DESCRPT: HOOD AVE @ SR 85/ SR 92

LENGTH (miles I km)

FUND: STP 0.2/0.32

OTHShare:
PE:LOCL ROW: 2001 CST: 2001 FED Share:

PROJECT: 333000- TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FA 110 .

LENGTH (mileslkm)

DESCRPT: SR 54 AT SANDY CREEK RD/CR 365

FUND: STP 0.2/0.32

OTH Share:
PE: 1999 ROW: 2001 CST: 2001 FED Share:

OTH Share:

PROJECT: 333172- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 010.00

DESCRPT: SR 74 @ LINE CREEK COWETAFAYETTE CO L1NEISEE COWETA 333177

PE:NONE ROW: NONE CST: NONE

ASSOCIATED PROJECTS: 333177-

$100,000 $175,000 $140,000
$35,000
$30,000 $100,000
$80,000
$20,000
$10,000 $70,000 $56,000
$14,000
UNDERWAY $50,000
$100,000 $80,000
$20,000

PROJECT: 371446- TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FA AR 177A

LENGTH (miles I km)

DESCRPT: REDWINE MULIT-USE TRAIL PHASE I

PROJECT: 371447- TYPE WORK: BICYCLE/PED:FACILITY

ATLANTA TMA TIP # FA AR 177B

LENGTH (miles I km)

DESCRPT: REDWINE MULIT-USE TRAIL - PHASE 3 & 4

PROJECT: 3V7039- TYPE WORK: CAPITAL

ATLANTA TMA TIP # FA 100D

LENGTH (miles I km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: CMAQ

PE: LOCL

010.00

ROW: LOCL

CST: 2001

FED Share:

OTH Share:

FUND: CMAQ

PE: LOCL

0/0.00

ROW: LOCL

CST:200J

FED Share:

OTHShare:

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$300,000 $240,000
$60,000
$210,000 $168,000
$42,000
$12,000 $12,000
$3,000

Page 137 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

r,

_ _ _ _ _ _ ...""... ..,. _ _. ~_..._"V'_""'

,~:

9/21/00

~



.......

~.....

" " = __ _" ....._~

FAYETTE COUNTY

PROJECT: 74287X TYPE WORK: WIDENING

FUND: STP

ATLANT A TMA TIP # CL 10 I

, LENGTf!(miles / km) , 0 /0,00

DESCRPT: SR 920 FROM SR 54 TO SR 3/US 19 {REL SR 81l SEE CLAYTON

EXIST, LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 742870-

PE:NONE 'ROW:NONE
CST: NONE

PROJECT: TOOOOl5 TYPE WORK: CAPITAL

ATLANTA TMA TIP # FA 1000

LENGTH (miles / km)

DESCRPT: FY 2002 FAYETTE COUNTY SECTION 5310

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

PROJECT: T000025 TYPE WORK: CAPITAL

ATLANTA TMA TIP # FA 1000

LENGTH (miles / km)

DESCRPT: FY 2003 FAYETTE COUNTY SECTION 5310

FUND: TRANSIT ~ PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$12,000 $12,000 $3,000
$13,000 $13,000 $3,000

..

i.
1
l;:S
,,
\

Page J38 of336

- - - - - - - - - - - _...-
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FLOYD COUNTY

PROJECT: 0000113 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ROME TIP #

LENGTH (miles / km) 0 /0.00

DESCRPT: OOSTANAULA RIVER BRiPED MALL NEAR CO OFC'SILANDSCAPING

PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 620590- TYPE WORK: WIDENING

FUND: STP

ROME TIP # L-85-11

LENGTH (miles / km) 0.2 /0.32 .

DESCRPT: SR IIUS 27 IN ROME FM 5TH AVE TO JOHN DAVENPORT DR

EXIST. LANES: 04 PROPOSED LANES: 05

OTHShare:
PE: 1993 ROW: 1997 CST: 2001 FED Share: GA Share:

$1,250,000 $1,000,000
$250,000
UNDERWAY UNDERWAY $3,702,000
$2,961,600 $740,400

PROJECT: 621550- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles/ km) 2.95/4.75

DESCRPT: SR 20/100 FM SR 100 NORTH TO SR 100 SOUTH @ COOSAIINCL CLVT

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$7,680,000 $6,144,000 $1,536,000

PROJECT: 621600- TYPE WORK: NEW CONSTRUCTION

FUND: STATE

PE: 1992

UNDERWAY

ROME TIP # S-89-21

LENGTH (miles / km) 3.9/6.28

ROW: 2002

$11,250,000

DESCRPT: S ROME BYP FM SR I ALONG BOOZE MTN RD TO SR 101 @ CR 96

CST:

AFTER 2003

..

EXIST. LANES: 00 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 62Y600-

PROJECT: 621660- TYPE WORK: NEW CONSTRUCTION

FUND:NHS

ROME TIP # S-92-24

LENGTH (miles / km) 5.4/8.69

DESCRPT: WEST ROME BYP FM HORSELEG CRK RD TO SR 20 @ CR 262; RW=HPP

EXIST. LANES: 00 PROPOSED LANES: 04

PE:NONE ROW: 2001 CST:,.

$8,250,000 AFTER 2003

PROJECT: 621670- TYPE WORK: NEW CONSTRUCTION

FUND:NHS

ROME TIP # S-92-23

LENGTH (miles / km} 5.8/9.34

DESCRPT: SW ROME BYP FM PROP W ROME BYP @ CR 268 TO SR I @ CR 633&BRD

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 2002 CST:

UNDERWAY $8,250,000 AFTER2003

PROJECT: 621690- TYPE WORK: WIDENING

FUND: STP

ROME TIP # S-92-25

LENGTH (miles / km) 0.87/1.40

DESCRPT: SR 101 FM CR 740/SADDLE TR TO CR 335/LOMBARDY WAY IN ROME

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIA TED PROJECTS: 620900-

PE: 1993 ROW: 2003 CST:

UNDERWAY $730,000
AFTER 2003

PROJECT: 622135- TYPE WORK: TURN LANES

FUND:NHS

ROME TIP # N-00-4

LENGTH (miles / km) 2.1 /3.38

DESCRPT: SR 20 TURN LANES FM SR 1 IN ROME TO SR 3 IN BARTOW CO/62Y 135

ASSOCIATED PROJECTS: 62Y I35-

PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$3,297,000 $2,637,600
$659,400

Page 139 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FLOYD .COUNTY

PROJECT: 631480- TYPE WORK: WIDENING

FUND: STP

ROME TIP # L-88

LENGTH (miles 1 km) 1.812.90

DESCRPT: SR IIUS 27 FROM VETERANS HIGHWAY TO OLD DALTON ROAD

EXIST. LANES: 04 PROPOSED LANES: 06

PE: 2001 ROW: CST: .

$352,000 AFTER 2003 AFTER 2003

PROJECT: 642395- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles 1 km) 0.23/0.37

DESCRPT: SR 156 @ JOHNS CREEK ON FLOYD-GORDON CO LINE

ASSOCIATED PROJECTS: 64239X-

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 642405- TYPE WORK: REPLACE BRIDGE LENGTH (mileslkm)
DESCRPT: SR 100 @COOSA RIVER.3 MI SOUTH OF JCT WITH SR 20

FUND: BRIDGE 0.3 10.48

PE:2001 ROW: CST:

$49,000 AFTER 2003 AFTER 2003

PROJECT: 642450- TYPE WORK: NEW CONSTRUCTION

FUND: STP

ROME TIP #

LENGTH (miles 1km) 4 16.44

DESCRPT: NORTH ROME BYPASS FM SR 20 @ CR 756 TO TECHNOLOGY PAR.K\yAY

EXIST. LANES: 00 PROPOSED LANES: 04

PE: 2001 ROW: LOCL CST:

$1,800,000 AFTER 2003

PROJECT: 650460- TYPE WORK: REPLACE BRIDGE

ROME TIP # L-89-04

LENGTH (miles 1 km)

'DESCRPT: SR 101 OVER ETOWAH RIVER IN ROME

EXIST. LANES: 04 PROPOSED LANES: 05

FUND: BRIDGE

PE: 1993

0.37/0.60

ROW: 1999

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY
$5,049,000 . $4,039,200 $1,009,800

PROJECT: 650540- TYPE WORK: WIDENING

FUND: STP

ROME TIP #

LENGTH (miles1 km) 0.41/0.66

DESCRPT: SR 101/2ND AVENUE FROM WEST 3RD STR~ET TO SR 1/20

EXIST. LANES: 03 PROPOSED LANES: 04

PE: 2003 ROW: CST:

$143,000 AFTER 2003 AFTER 2003

PROJECT: 650550- TYPE WORK: MINOR WIDEN & RESURF

FUND: STP

ROME TIP #

LENGTH (miles 1 km) 0.59/0.95

DESCRPT: CS 7721N. 2ND AVE FROM SHORTER AVE TO JOHN DAVENPORT DRIVE

PE:2003 ROW: LOCL CST:

$44,000
.AFTER 2003
,

PROJECT: 650610- TYPE WORK: TURN LANES

, ROME TIP #

LENGTH (miles 1 km)

DESCRPT: SR ILP AT CR 796/0LD CALHOUN ROAD IN ROME

LUMP SUM PROJECT

FUND: STP 0.2/0.32

PE: 2001 ROW: LOCL CST: 2003 FED Share: GA Share:

$32,000
$67,000 $60,300 $6,700

Page 140 of336

_ _._-_.__-_. - STATE ,TRANSPORTATIONIMPROVEMENTPROGRAM

..

..

-,-~--, . ."" ._.9,/-2-1_/00.-, ,,-------,----

FLOYD COUNTY

PROJECT: 662420- TYPE WORK: WIDENING

FUND: STATE

ROME TIP # L-89-06

LENGTH (miles / km)' 4 /6.44

DESCRPT: SR 746/SE ROME BYP FM SR 101 NE ALONG 4 EXIST RDS TO US 411

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 66Y420-

PE: 1993 ROW: 2002 CST:

UNDERWAY $18,100,000

.'

AFTER 2003

PROJECT: 671110- TYPE WORK: SIGNING'

FUND: FOREST HWY PE: 1999

LENGTH (miles/km) 6.2/9.98

ROW: NONE

DESCRPT: CALHOUN GAP RD/CR 21OICR 194 FM CR 641 TO CR 482/GORDON

CST: 200 I FED Share:

ASSOCIATED PROJECTS: 67111X-

UNDERWAY
$10,000 $10,000

PROJECT: 6V7024- TYPE WORK: CAPITAL

ROME TIP #

LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$25,000 $25,000 $6,000

PROJECT: TOOOl60 TYPE WORK: CAPITAL

ROME TIP #

LENGTH (miles / km)

DESCRPT: FY 2002 ROME SECTION 5310 CAPITAL

FUND: TRANSIT

PE: NONE

0/0,00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$26,000 $26,000
$7,000

PROJECT: TOOOl99 TYPE WORK: CAPITAL

ROME TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 ROME SECTION 5310 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$27,000 $27,000 $7,000

PROJECT: T000201 TYPE WORK: CAPITAL

ROME TIP #

LENGTH (miles / km)

DESCRPT: FY 2001 ROME SECTION 5307 CAPITAL

PROJECT: T000202 TYPE WORK: CAPITAL

ROME TIP#

LENGTH (miles / km)

DESCRPT: FY 2002 ROME SECTION 5307 CAPITAL

PROJECT: T000203 TYPE WORK: CAPITAL

ROME TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 ROME SECTION 5307 CAPITAL

r
t~~;~~:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTHShare:

$202,000 $149,000
$19,000 $53,000
$89,000 $79,000 $10,000 $10,000
$63,000 $56,000 $7,000 $7,000

Page 141 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9121100

FLOYD COUNTY

PROJECT: T000204 TYPE WORK: CAPIT AL

ROME TIP #

LENGTH (miles / km)

DESCRPT: FY 2001 ROME SECTION 5309 CAPITAL

PROJECT: T000205 TYPE WORK: CAPITAL

ROME TIP #

LENGTH (miles / km)

DESCRPT: FY 2002 ROME SECTION 5309 CAPITAL

PROJECT: T000206 TYPE WORK: . CAPITAL

ROME TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 ROME SECTION 5309 CAPITAL

PROJECT: T000207 TYPE WORK,: OPERATING

ROME TIP #

. LENGTH (miles / km)

. DESCRPT: FY 200 I ROME SECTION 5307 OPERATING

PROJECT: T000208 TYPE WORK: OPERATING

ROME TIP #

LENGTH(miles / km)

DESCRPT: FY 2002 ROME SECTION 5307 OPERATING

. PROJECT: T000209 TYPE WORK: OPERATING

ROME TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 ROME SECTION 5307 OPERATING

FUND: TRANSIT

PE: NONE

010.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

. CST: 2002

FED Share:

GA Share:

OTHShare:

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

FUND: TRANSIT

PE: NONE

010.00

ROW: NONE

CST: 2001

FED Share:

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

OTHShare:

FUND: TRANSIT. PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

OTH Share:

$198,000 $176,000 $22,000
$22,000
$198,000 $176,000
$22,000 $22,000
$198,000 $176,000
$22,000 $22,000
/ i I'
$1,247,000 $377,000
$870,000
$1,310,000 $377,000
$933,000
$1,376,000 $377,000
$999,000

c :.',1'' ..~... ~C:,~? ~>:..

Page 142 of336

___"''-_..

STATE TRANSPORTATION IMPROVEMENT PROGRAM

''

9'/2.1_./.,0_0r.,_._'. .'_._._...__. _._.... ._ ...,_,_.,__ '

~_"',

. ._._ _

FORSYTH COUNTY
PROJECT: 0000137 TYPE WORK: SIDEWALKS LENGTH (miles / km)
DESCRPT: CUMMING SIDEWALKS

FUND: STP 0/0,00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000811 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 1.2 / 1.93

DESCRPT: SR 369 AT 6 INTERSECTIONS BT BETHEL RD AND SHADY GROVE RD

LUMP SUM PROJECT

OTH Share:
PE: 2000 ROW: CST:

$500,000 $400,000
$100,000
UNDERWAY AFTER 2003 AFTER 2003

PROJECT: 0000812 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.6/0.97

DESCRPT: SR 306@SR 53; SR 306@SHADBURN/PARKS; SR 306@ WALDRIP RD

LUMP SUM PROJECT

PE: 2000 ROW: CST:

UNDERWAY AFTER 2003 AFTER 2003

PROJECT: 122250- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 20 FM SR 400 TO SAMPLE ROAD/CR 80 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 132630-

FUND:STP 2.29/3.69

PE: 1992 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $13,145,000
$4,382,000 $3,505,600
$876,400

t.... PROJECT: 132630- TYPE WORK: INTERCHANGE

FUND:NHS

PE: 1992

-"
UNDERWAY

LENGTH (miles / km) 0.2/0.32

ROW: 2001

$3,385,000

,DESCRPT: SR 400 AT SR 20 INTERCHANGE RECONSTRUCTION

CST: 2002

$6,201,000

FED Share:

$4,960,800

ASSOCIATED PROJECTS: 122250-

GA Share:

$1,240,200

PROJECT: 132940- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles/km) 0.5/0.81

DESCRPT: SR 400/US 19 AT SETTING DOWN ROAD/CR 176 NE OF CUMMING

LUMP SUM PROJECT

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$361,000 $324,900
$36,100

PROJECT: 13298X- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0/0.00

DESCRPT: SR20 @ CHAITAHOOCHEE RIVER@FORSYTH CO LNISEE GWINNEIT 132985

ASSOCIATED PROJECTS: 132985-

PE:NONE ROW: NONE CST: NONE

PROJECT: 141870- TYPE WORK: INTERCHANGE

FUND: STP

PE: 2001

LENGTH (miles / km) 0.5 /0.81

ROW: 2002

DESCRPT: SR 400 AT MCFARLAND ROAD INTERCHANGE RECONSTRUCTION .~"
(
L~)~

CST: 2003 FED Share:
GA Share:

$5,000 $2,000,000 $5,760,000 $4,608,000 $1,152,000

Page 143 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FORSYTH COUNTY

.-';.

PROJECT: 142300- .TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

lli

LENGTH (miles 1 km) 0.2/0.32

PE: 1999 ROW: LOCL

UNDERWAY

DESCRPT: SR 371 AT KELL Y MILL' ROAD/CR 5

'

CST: 2001

$394,000

LUMP SUM PROJECT

FED Share:

$354,600

GA Share:

$39,400

...

( l._~::-~

Page 144 of336

_ _ lOa ,

STATE TRANSPORTATION IMPROVEMENT PROGRAM

" _ _._~"_"'

9/21/00
I._:CO."""'-"'_ _"'_"-_'''.''"'''''':

"'lIlL ,

._a-._._*

FRANKLIN COUNTY

PROJECT: 00004XO TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles I km)O 10.00

DESCRPT: 1-85 @ SR 15; SR 63 BANKS & AND SR 51/320/FRANKLIN 0000470

PE:NONE ROW: NONE CST: NONE

ASSOCIATED PROJECTS: 0000470

PROJECT: 0000955 TYPE WORK: BRIDGES

FUND: OTHER

LENGTH (miles I km) O. I 10.16

DESCRPT: SR 8/US 29 NEW PEDESTRIAN BR E OF SPRING STIFRANKLIN SPRINGS

PE:2001 ROW: NONE CST: NONE

_
$75,000

PROJECT: 110780- TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles I km) 0.6 10.97

DESCRPT: 1-85 SAFETY UPGRADES @ SR 106; SR 17 AND SR 77 IN HART CO.

ASSOCIATED PROJECTS: 110782-

PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$9,800,000 $8,820,000
$980,000

PROJECT: 122080- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 4.3 16.92

DESCRPT: SR 17 FM SE CR 67/ROSS PL N LAVONIA TO SE STEPHENS CL & BR

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 12Y080-

PE: 1993 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $2,402,000 $7,000,000 $5,600,000 $1,400,000

PROJECT: 12Y080- TYPE WORK: WIDENING

FUND: 1M

LENGTH (miles I km) 0 10.00

DESCRPT: SR 17[@1-85 RECST INT) FM CR 67/ROSS PL LAVONIA-STEPHENS C

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 122080-

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$500,000 $450,000
$50,000

PROJECT: 133001- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (mlles r km) 0.24/0.39

DESCRPT: SR 145 @ NORTH FORK BROAD RIVER 1.7 MI W FRANKLIN SPRJNGS

PE: 2001 ROW: CST:

$22,000 AFTER 2003 AFTER 2003

PROJECT: 141990- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles I km) 0.22 10.35

ROW: 2000

DESCRPT: SR 145 @NORTH FORK BROAD RIVER NORTH OF CARNESVILLE

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY
$635,000 $508,000 $127,000

PROJECT: 811063- TYPE WORK: WEIGH STATION

FUND: 1M

PE: 1995

UNDERWAY

. LENGTH (miles I km) 0 10.00

ROW: NONE

DESCRPT: UPGRADE 1-85 NB AND SB WEIGH STATIONS INCL SCALE REPLACEMENT

CST: 2001

$5,000,000

~

':

t~ .0;

FED Share: GA Share:

$4,500,000 $500,000

Page 145 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
._---.-. ._-<--_. . _ _., ..--,,---_._9-/2-1_/0.0_. "'- _._/._------

FULTON COUNTY

"

PROJECT: 0000044, TYPE WORK: SIDEWALKS

FUND: STP

,;;'t

ATLANT A TMA TIP # AT AR BP300

LENG!H (miles / km) 0/0.00

DESCRPT: ATLANTA - FAIRLIE/POPLAR STREETSCAPE

PE:LOCL ROW: LOCL CST: 2001

FED Share:

PROJECT: 0000103 TYPE WORK: BICYCLE/PED, FACII.ITY

ATLANTA TMA TIP # FN AR BPI 00

LENGTH (miles / km)

DESl;RPT: ROGERS BRIDGE ROAD MULTI-USE TRAIL PROJECT

FUND: STP 0/0.00

OTHShure:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000104 TYPE WORK: LANDSCAPING

ATLANT A TMA TIP # FN AR BP099

LENGTH (miles I km)

DESCRP~ CRABAPPLESTREETSCAPE

FUND:STP 0/0.00

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000105 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FN AR BP098

LENGTH (miles / km)

DESCRPT: VICKERY CREEK UNIT (NPS) PED BRIDGES

OTHShare:

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 '. FED Share:

PROJECT: 0000106 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # GW AR BP097

LENGTH (miles / km)

DESCRPT: ROGERS BRIDGE TRAIL IN FULTON & GWINNETT

FUND: STP 0/0.00

OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000181 TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # AT AR BP299 .

LENGTH (miles / km)

DESCRPT: ATLANTA - CASCADE/MAYS STREETSCAPE

FUND: STP 0/0.00

OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 0000183 TYPE WORK: LANDSCAPING

PUND: STP

PE: LOCL

ATLANTA TMA TIP# AT AR BP298

LENGTH (miles/km) 0/0.00

ROW: LOCL

DESCRPT: ATLANTA - JOHN LEWIS COMMEMORATIVE PK GATEWAY TO FREEDOM PK

CST: 200 I

FED Share:

.,~..: ,
4:.s::.:::

PROJECT: 0000184 TYPE WORK: SIDEWALKS

. FUND: STP

ATLANTA TMA TIP # AT AR BP297

LENGTH (miles / km) 0/0.00

DESCRPT: ATLANTA - LAKEWOOD HEIGHTS TOWN CENTER STREETSCAPE

OTHShure:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

$1,200,000 $960,000 $240,000
$1,500,000 $1,200,000
$300,000
$1,128,000 $902,000 $226,000
$600,000 $480,000 $120,000
$480,000 $384,000
$96,000
$450,000 $360,000
$90,000
$300,000 $240,000 $60,000
$450,000 $360,000
$90,000

Page 146 of336

- _ _......

.... .

STATE TRANSPORTATION IMPROVEMENT PROGRAM
.. _----9/2-1/0-0 --. . ------_._-

. FULTON COUNTY PROJECT: 0000186 TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # AT AR BP296

LENGTH (miles / km)

DESCRPT: ATLANTA - CHESHIRE BRIDGE ROAD STREETSCAPE

FUND:STP 0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

$600,000 $480,000

PROJECT: 0000187 TYPE WORK: SIDEWALKS

ATLANT A TMA TIP # AT AR BP295

LENGTH (miles / km)

DESCRPT: ATLANTA - MEMORIAL PARKffANYARD PK TRAIL

FUND: STP 0/0.00

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

$120,000
$224,000 $179,000

PROJECT: 0000189 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FS AR BP081

LENGTH (miles / km)

DESCRPT: ROOSEVELT HWY(US 29) BIKE LANES/SIDEWALKS

FUND: STP 0/0.00

OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$45,000
$150,000 $120,000

PROJECT: 0000191 TYPE WORK: BICYCLE/PED. FACILITY

ATLANT A TMA TIP # FS AR BP082

LENGTH (miles / km)

DESCRPT: FAIRBURN RD SIDEW ALKIBIKE LANES

.-

PROJECT: 0000192 TYPE WORK: LANDSCAPING

ATLANT A TMA TIP # FN AR BP096

LENGTH (miles / km)

DESCRPT: SANDY SPRINGS - ROSWELL RD STREETS CAPE

FUND:STP 0/0.00

OTH Share:
PE: LOCLROW: LOCL CST: 2001 FED Share:

FUND:STP 0/0.00

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$30,000
$750,000 $600,000 $150,000
$600,000 $480,000

PROJECT: 0000193 TYPE WORK: BICYCLE/PED. FACILITY

ATLANT A TMA TIP # FS AR BP083

LENGTH (miles / km)

DESCRPT: UNION CITY STREETSCAPE

FUND: STP 0/0.00

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

$120,000
$300,000 $240,000

PROJECT: 0000194 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # AT AR BP294

LENGTH (miles / km)

DESCRPT: ATLANTA SOUTHTOWNE TRAIL PHASE I

FUND: STP 0/0.00

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$60,000
$660,000 $528,000

PROJECT: 0000197 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FS AR BP084

LENGTH (miles / km)

DESCRPT: EAST POINT - MAIN STREET STREETSCAPE ~
r-
~.
~2'-"

FUND:STP 0/0.00

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

$132,000
$150,000 $120,000
$30,000

Page 147 of336

__ ---------------------------------_. ..
. STATE TRANSPORTATIONIMPROVEMENTPROGRAM
9121100

FULTON COUNTY

PROJECT: 0000198 TYPE WORK: INTERSECTION IMPROVEMENT

I

ATLANTA TMA TIP # AR 157

LENGTH (miles / km)

DESCRPT: SR 9 IN ROSWELL AT OXBO STREET

LUMP SUM PROJECT

FUND:STP 0.2/0.32

.'

PROJECT: 0000199 TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # AR 157

LENGTH (miles / km)

DESCRPT: SR 9 IN ROSWELL AT OAK STREET

LUMP SUM PROJECT

FUND:STP 0.2/0.32

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
.$218,000 $196,200 $21,800
UNDERWAY
. $229,000 $206,100
$22,900

PROJECT: 0000200 TYPE WORK: HISTORIC PRESERVATION

ATLANTA TMA TIP # FS AR BP085

LENGTH (miles / km)

DESCRPT: COLLEGE PARK RAIL DEPOT RESTORATION

FUND:STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$354,000 $283,000

OTH Share:

$71,000

PROJECT: 0000201 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FS AR BP086

LENGTH (miles / km)

DESCRPT: EAST POINT - DODSON CONNECTOR BIKE/PED LANES

FUND:STP 0/0.00

PE: LOCL ROW: LOCL . CST: 2001 FED Share:

OTH Share:

$210,000
-. $168,000
$42,000

PROJECT: 0000247 TYPE WORK: TURN LANES

FUND:NHS

ATLANTA TMA TIP # FN AR 203

LENGTH (miles / km) . 0.2/0.32

DESCRPT: 1-285 INTERCHANGE AT ROSWELL ROAD

PE: 2000 ROW: 2001 CST: 2002 FED Share: GA Share:

. UNDERWAY $200,000
$1,100,000 $880,000 $220,000

PROJECT: 0000248 TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FN 191A

LENGTH (miles / km)

DESCRPT: SR 9/ROSWELL ROAD AT DUNWOODY PLACE

FUND:HPP 0.2/0.32

PE: 1999 ROW:-LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 0000249 TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FN 191B

LENGTH (miles / km)

DESCRPT: SR 9/ROSWELL ROAD AT NORTHRIDGE ROAD

FUND:HPP 0.2/0.32

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 0000251 TYPE WORK: INTERSECTION IMPROVEMENT' FUND:HPP

PE: 1999

UNDERWAY

ATLANTATMA TIP# FN 1910

LENGTH (mileslkm) 0.2/0.32

ROW: LOCL

DESCRPT: SR 140/ARNOLD MILL ROAD AT GREEN ROAD

CST: 2001

$400,000

FED Shure:

$320,000

~~..;.)

GA Share:

$80,000

Page J 48 of336

STATE TRANSPORTATIONIMPROVEMENT PROGRAM

--,--,._---_.__.__.. 9/21/00 _-~-~>:&--..--,

-_.--_. " . ._--_. . .__. -

FULTON COUNTY

PROJECT: 0000252 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: HPP

PE: 1999 .

ATLANTA TMA TIP # FN 191E

. LENGTH (miles 1 km) 0.2 10.32

ROW: LOCL

DESCRPT: SR I40/HOLCOMB BRIDGE ROAD AT HOUZE ROADI ALPHARETTA HIGHWAY

CST: 200 I

FED Share:

GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 0000253 TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FN 191F

LENGTH (miles 1 km)

DESCRPT: SR 9/CUMMING HIGHWA Y AT WEBB ROAD

FUND:HPP 0.2/0.32

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 0000254 TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FN 191G

LENGTH (miles 1 km)

DESCRPT: MCGINNIS FERRY ROAD/CR 1319 AT DOUGLAS ROAD

FUND:HPP 0.2/0.32

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 0000255 TYPE WORK: INTERSECTION IMPROVEMENT

. ATLANTA TMA TIP # FN 191H

LENGTH (mileslkm)

DESCRPT: RUCKER ROAD/CR 1331 AT HARRIS ROAD

FUND:HPP 0.2/0.32

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 0000256 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: HPP

ATLANTA TMA TIP# FN 1911

LENGTH (miles Zkm) 0.2/0.32

DESCRPT: MCGINNIS FERRY ROAD/CR 1319 AT WINDWARD PARKWAY

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 0000257 TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FN 191J

LENGTH (mileslkm)

. DESCRPT: MCGINNIS FERRY ROAD/CR 13I 9 AT UNION HILL ROAD

FUND: HPP 0.210.32

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 0000258 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: HPP

ATLANTA TMA TIP # FN 191K

LENGTH (miles r km) 0.2/0.32

DESCRPT: MCGINNIS FERRY ROAD/CR 41 AT WINDWARD CONCOURSE

'PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

::
(" .
~..:

PROJECT: 0000259 TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FN 191L

LENGTH (miles 1 km)

DESCRPT: JONES BRIDGE ROAD/CR 65 AT DOUGLAS ROAD

FUND: HPP 0.2/0.32

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:'

UNDERWAY
$400,000 $320,000
$80,000
UNDERWAY
$400,000 $320,000
$80,000

Page 149 of336

---- ---_._-----------------
STATE TRANSPORTATION IMPROVEMENTPROGRAM

9/21/00

..- . , . . - " " " ' - - ' . . , " " - '...- - . , . , . " ".. ~-""""":;~".--""'-,.-<

-.~--'-''''.--'''''------_0

-,_,_ti<_.

~ AI_.__..

,

FULTON COUNTY

PROJECT: 0000337 'TYPE WORK: SIDEWALKS

FUND: STP

PE: NONE

ATLANTA TMA TIP # AT AR BP301

LENGTH (miles/km) 0/0.00

ROW: NONE

DESCRPT: EAST WESLEY SIDEWALK FM PEACHTREE RD TO PIEDMONT RD&BIKE/PED

CST: 2001

FED Share:

$1,250,000 $1,000,000

PROJECT: 0000338 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FN AR BPI02

LENGTH (miles/km)

DESCRPT: WILLEO/COLEMAN ROAD - BIKE/PED

FUND: STP 0/0.00

OTHShare:
PE: LOCL ROW: NONE CST: 2001 FED Share:

$250,000
$350,000 $280,000

PROJECT: 0000351 TYPE WORK: RIDE SHARING

ATLANTA TMA TIP # AR 220C

LENGTH (miles / km)

DESCRPT: UNIVERSITY RIDESHARE PROG YEAR 3

OTH Share:

FUND:CMAQ 0/0.00

PE: 2001 ROW: NONE CST: NONE

$70,000 $250,000

PROJECT: 0000371 TYPE WORK: PVMNT MARKINGS

ATLANTA TMA TIP # AR 130P

LENGTH (miles / km)

DESCRPT: PAVEMI,::NT MARKINGS TO DESIGNATE TRUCKLANES

LUMP SUM PROJECT

FUND: 1M 0/0.00

PE: 2000 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY

$1,500,000

$1,350,000

$150,000

.~

PROJECT: 0000373 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: 1M

ATLANTATMATIP#AR 130P

LENGTH (miles/km) 0/0.00

DESCRPT: 1-285/1-20 INTERMEDIATE SOLUTION TO REDUCE ,TRUCK OVERTURNING

PE: 2000 ROW: NONE CST: 2001 FEDShllre: GA Share:

UNDERWAY
$1,500,000 $1,350,000
$150,000

PROJECT: 0000376 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: NHS

ATLANTA TMA TIP # AR 359B

LENGTH (miles / km) 0/0.00

DESCRPT: ADDED ENFORCEMENT TO REDUCE TRUCK SPEEDING; TAILGATING; ETC.

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$500,000 $400,000 $100,000

PROJECT: 0000377 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: NHS

ATLANTATMA TIP#AR359A

LENGTH (miles/km) 0/0.00

DESCRPT: PROMOTIONAL CAMPAIGN TO REDUCE TRUCKS DURING RUSH HOUR

PE: 2000 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 0000394 TYPE WORK: SPECIAL STUDIES

FUND: NHS

ATLANTA TMA TIP # AR 373

LENGTH (miles / km) . 0/0.00

DESCRPT: STUDY OF HOURLY TRUCK MOVEMENTS AROUND ATLANTA

PE: 2001 ROW: NONE CST: NONE

$600,000

Page 150 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00 ._--_._-_._--------

FULTON COUNTY

PROJECT: 0000490 TYPE WORK: RAIL PROJECTS

ATLANTA TMA TIP # AR 3440

LENGTH (miles I km}

DESCRPT: COMMUTER RAIL PROGRAM MANAGEMENT - PHASE 4 PROPOSED TCM

FUND: OTHER 010.00

. PE: 2003 ROW: NONE CST: NONE

$2,000,000

PROJECT: 0000491 TYPE WORK: VEHICLE PURCHASES

FUND:NHS

ATLANTA TMA TIP # AR 268A2

LENGTH (miles I km) 0 10.00

DESCRPT: COMMUTER RAIL ATLANTA TO GRIFFIN TRAINSET PURCHASE FOR 2001

PROPOSED TCM

.

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$15,000,000 $12,000,000
$3,000,000

PROJECT: 0000492 TYPE WORK: VEHICLE PURCHASES

FUND: NHS

ATLANTA TMA TIP # AR 268B2

LENGTH (mileslkm) 010.00

DESCRPT: COMMUTER RAIL ATLANTA TO GRIFFIN TRAIN SET PURCHASE FOR 2002 PROPOSED TCM

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:'

$15,000,000 $12,000,000
$3,000,000

PROJECT: 0000493 TYPE WORK: VEHICLE PURCHASES

FUND: NHS

PE:NONE

ATLANTA TMA TIP # AR 269A2A

LENGTH (mileslkm) 010.00

ROW: NONE

DESCRPT: COMMUTER RAIL ATLANTA TO ATHENS TRAIN SET PURCHASE FOR 200 I; Y

CST: 2001

PROPOSED TCM

FED Share:

ASSOCIATED PROJECTS: 00Y0493

GA Share:

$17,500,000 $14,000,000
$3,500,000

PROJECT: 0000494 TYPE WORK: VEHICLE PURCHASES

FUND: NHS

ATLANTA TMA TIP # AR 269B2

LENGTH (miles I km) 0 10.00

DESCRPT: COMMUTER RAIL ATLANTA TO ATHENS TRAINSET PURCHASE FOR 2002 PROPOSED TCM

PE:NONE ROW.' NONE CST: 2002 FED Share: GA Share:

$29,000,000 $23,200,000
$5,800,000

PROJECT: 0000524 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 2870

LENGTH (miles I km) 0 10.00

DESCRPT: MEASUREMENT OF AIR QUALITY INITIATIVES (PSG; CC; CAC)

PE:2003 ROW: NONE CST: NONE

$800,000

PROJECT: 0000537 TYPE WORK: LANDSCAPING

ATLANTA TMA TIP # FS AR BP080

LENGTH (miles I km)

DESCRPT: PALMETTO STREETSCAPE

FUND: STP 010.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000547 TYPE WORK: MISCELLANEO~S IMPROVEMENTS FUND: STP

ATLANTA TMA TIP.# AR 300C

LENGTH (miles Zkm) 010.00

DESeRPT: PARTNERSHIP FOR A SMOG-FREE GEORGIA (PSG) PHASE 6

OTHShare:
PE:2003 ROW: NONE CST: NONE

$180,000 $144,000
$36,000 $1,500,000

Page 151 of336

__ _-------- ----_. .._--

._----------_._----

__ __.----- _-_._ STATE TRANSPORTATION IMPROVEMENT PROGRAM

.."--_._-. ._. ._----~~----,--_._-_

9/21/00

__ ... .... ~-_ _.~~.

..~--

FULTON COUNTY

PROJECT: 0000548 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP

ATLANTA TMA TIP # AR 346B

LENGTH (miles / km) 0/0.00

DESCRPT: ACTIVITY CENTERfTOWN CENTER INVESTMENT POLICY STUDIES: YR, 2

PE: 2001 ROW: NONE CST: NONE

$1,250,000

PROJECT: 0000549 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP

ATLANTA TMA TIP # AR 346C

LENGTH (miles / km) 0/0.00

DESCRPT: ACTIVITY CENTERfTOWN CENTER INVESTMENT POLICY STUDIES: YR 3

PE: 2002 ROW: NONE CST: NONE

$1,250,000

PROJECT: 0000550. TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP

ATLANTA TMA TIP # AR 3460

LENGTH (miles/km) 0/0.00

DESCRPT: ACTIVITY CENTERfTOWN CENTER INVESTMENT POLICY STUDIES: YR 4

PE: 2003 ROW: NONE CST: NONE

$1,250,000

PROJECT: 000055 I TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP

PE:NONE

ATLANTA TMA TIP # AR 361A

LENGTH (miles I km) 0/0.00

ROW: NONE

DESCRPT: ACTIVITYffOWN CENTER INVESTMENT POLICY STUDIES:IMPLEMENT:YRI

CST: 2003

$20,000,000

FED Share:

$16,000,000

.,

OTH Share:

$4,000,000

PROJECT: 0000552 TYPE WORK: TRANSIT FACILITIES

FUND: STP

ATLANTA TMA TIP # AR 362

LENGTH (miles / km) 0/0.00

DESCRPT: BUCKHEAD MAINTENANCE FACILITY FOR SHUTTLE SYSTEM

PE:NONE ROW: NONE CST: 2003 FED Share:

$620,000 $496,000

PROJECT: 0000553 TYPE WORK:, VEHICLE PURCHASES

ATLANTA TMA TIP # AR 375

LENGTH (miles / km)

DESCRPT: REGIONAL BUS PURCHASE: 60 eNG BUSES

FUND: ~TP 0/0.00

OTHShare:
PE: NONE ROW: NONE CST:2001 . FED Share:

$124,000
$20,000,000 $16,000,000

PROJECT: 0000554 TYPE WORK: B!CYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # AT 18.8

'. LENGTH (miles / km) 0.5 /0.81

DESCRPT: ALEXANDER ST CORRIDOR IMPR FM W. PEACHTREE ST TO LUCKIE ST

OTH Share:
PE:LOCL ROW: LOCL ,CST: 2001 FED Share:

$4,000,000
. $5,000,000 $4,000,000

PROJECT: 0000563 TYPE WORK: PARK & RIDE LOJ

FUND: STP

ATLANTA TMA TIP # MA AR 266

t' LENGTH (miles I km)

0 /0.00

DESCRPT: MARTA PARK AND RIDE LOT SR 400 AT WINDWARD PK WY

OTHShare:
PE:NONE ROW: NONE CST: 2001 FED Share:

$1,000,000
$1,000,000 $800,000

OTH Share:

$200,000

Page J52 of336

_ _..

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00 .-"'_._ _ _ _ ~

"._::_'~_,:<O."'_.

.._' _......

~ _ u _._._ . '

...

FULTON COUNTY

PROJECT: 0000567 TYPE WORK: RIDE SHARING

ATLANTA TMA TIP # AR 2200

LENGTH (miles / km)

DESCRPT: UNIVERSITY RIDES HARE PROGRAM: YEAR 4

FUND:CMAQ 0/0.00

PE: 2002 ROW: NONE CST: NONE

_
$900,000

PROJECT: 0000568 TYPE WORK: RIDE SHARING

ATLANTA TMA TIP # AR 220E

LENGTH (miles /ikm)

DESCRPT: UNIVERSITY RIDESHARE PROGRAM: YEAR 5

FUND:CMAQ 0/0.00

PE: 2003 ROW: NONE CST: NONE

$900,000

PROJECT: 0000570 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 22 IE

LENGTH (miles / km) 0 /0.00

DESCRPT: START-UP FUNDS TRANSPORTATION MANAGEMENT ASSOCIATIONS: YR 4

PE: 2002 ROW: NONE CST: NONE

$675,000

PROJECT: 0000571 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 221 F

LENGTH (miles / km) 0/0.00

DESCRPT: START-UP FUNDS TRANSPORTATION MANAGEMENT ASSOCIATIONS: YR 5

PE: 2003 ROW: NONE CST: NONE

$1,000,000

'-.>. -
PROJECT: 0000572 TYPE WORK: SPECIAL STUDIES

ATLANTA TMA TIP # AT AR 225

LENGTH (miles / km)

DESCRPT: MORELAND AVE CORRIDOR STUDY

FUND:CMAQ 0/0.00

PE: 2001 ROW: NONE CST: NONE

$75,000

PROJECT: 0000573 TYPE WORK: SPECIAL STUDIES

FUND: CMAQ

ATLANTA TMA TIP # AT AR 226

LENGTH (miles / km) 0 /0.00

DESCRPT: PONCE DE LEON AVE CORRIDOR TRANSPORTATION STUDY

PE: 2001 ROW: NONE CST: NONE

$70,000

PROJECT: 0000574 TYPE WORK: SPECIAL STUDIES

FUND: CMAQ

ATLANTA TMA TIP # AT AR 227

LENGTH (miles/km) 0/0.00

DESCRPT: NORTHSIDE DRIVE CORRIDOR TRANSPORTATION STUDY

PE: 2001 ROW: NONE CST: NONE

$165,000

~.
c~( '. ~:~~.

PROJECT: 0000579 TYPE WORK: MISCELLANEOU~ IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 2800

LENGTH (miles / km) 0/0.00

DESCRPT: ALTERNATE FUEL INFASTRUCTURE DEVELOPMENT PROGRAM - PHASE 4

PE:NONE ROW.'NONE CST: 2001 FED Share:

OTHShare:

$1,000,000 $800,000
$200,000

Page /53 of336

._--_ __ STATE TRANSPORTATION IMPROVEMENT PROGRAM ._. . ----- ---_.--.._---- 9/21/00 --------,--_.._--.

FULTON COUNTY

PROJECT: 0000580 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 280E

LENGTH (miles I km) 0/0.00

DESCRPT: ALTERNATE FUEL INFASTRUCTURE DEVELOPMENT PROGRAM - PHASE 5

PE:NONE ROW: NONE CST: 2002 FED Share:

$1,000,000 . $800,000

OTHShare:

PROJECT: 0000581 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

PE:NONE

. ATLANTA TMA TIP # AR 280F

LENGTH (miles I km) 0 10.00

ROW: NONE

DESCRPT: ALTERNATE FUEL INFASTRUCTURE DEVELOPMENT PROGRAM - PHASE 6

CST: 2003

FED Share:

$200,000
$1,000,000 $800,000

OTHShare:

PROJECT: 0000582 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 285B

LENGTH (mileslkm) 0/0.00

DESCRPT: ALT FUEL VEHICLE INCREMENTAL COST INCENTIVE PRGM - YEAR 2

PE: 2002 ROW: NONE CST: NONE

$200,000 $2,000,000

PROJECT: 0000583 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 285C

LENGTH {miles I km) 0 10.00

DESCRPT: ALT FUEL VEHICLE INCREMENTAL COST INCENTIVE PRGM - YEAR 3

PE: 2003 ROW: NONE CST: NONE

$2,000,000

~, . ' . ,~

PROJECT: 0000584 TYPE WORK: RIDE SHARING

FUND: CMAQ

ATLANTA TMA TIP # AR 290B

LENGTH (miles I km) 0 10.00

DESCRPT: TRANSIT & CARPOOL SUBSIDIES FOR REGIONAL EMPLOYEES: YEAR 2

PE: 2001 ROW: NONE CST: NONE

$25,000

PROJECT: 0000585 TYPE WORK: RIDE SHARING

FUND: CMAQ

ATLANTA TMA TIP # AR 290C

LENGTH (miles I km) 0 10.00

DESCRPT: TRANSIT & CARPOOL SUBSIDIES FOR REGI9NAL EMPLOYEES: YEAR 3

PE: 2002 ROW: NONE CST: NONE

$25,000

PROJECT: 0000586 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: C,MAQ

ATLANTA TMA TIP #AR 291C

LENGTH (miles rkm) 0/0.00

DESCRPT: STATE .EMPLOYEE COMMUTER ASSISTANCE &TRANSIT INCENTIVE PR.PH4

PE: 2003 . Ro'W:NONE
CSr':NONE

. $500,000

;( ."
LJ:

PROJECT: 0000587. TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTATMA TIP#AR272B

LENGTH (mileslkm) 0/0.00

DESCRPT: TRANSPORTATION MANAGEMENT INITIATIVE:PH 2 EMPLOYER ASSIST.

PE: 2002 ROW: NONE CST: NONE

, $300,000

Page 154 of336

-------------- ._--'----------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
-----------,-"-,-_._--,------_.,~---~--_._---

FULTON COUNTY

PROJECT: 0000588 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 272C

LENGTH (miJes/km) 010.00

DESCRPT: TRANSPORTAnON MANAGEMENT INITIATIVE:PH 3 EMPLOYER ASSIST.

PE:2003 ROW: NONE CST: NONE

$300,000

PROJECT: 0000589 TYPE WORK: RIDE SHARING

FUND: CMAQ

ATLANTA TMA TIP # AR 296B

LENGTH (miles I km) 0/0.00

DESCRPT: REGIONAL VANPOOL SUBSIDY PROGRAM-50 VANPOOLS: YEAR 2

PE: 2002 ROW: NONE CST: NONE

$300,000

PROJECT: 0000590 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANT A TMA TIP # AR 2970

LENGTH (miles / km) 0 /0.00

DESCRPT: CLEAN AIR CAMPAIGN EDUCATION AND OUTREACH: YEAR 6

PE: 2003 ROW: NONE CST: NONE

$3,000,000

PROJECT: 0000591 TYPE WORK: VEHICLE PURCHASES

FUND: CMAQ

PE:NONE

ATLANTA TMA TIP # AR 365

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: SCAT: PURCHASE 9 REGIONAL ALTERNATIVE FUELED BUSES

CST: 2002

FED Share:

$2,363,000 $1,890,000

.~: .

OTH Share:

-t. ~~ ..
PROJECT: 0000592 TYPE WORK: SPECIAL STUDIES

FUND:CMAQ

PE: 2001

ATLANTA TMA TIP # AR 367 A

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: REGIONAL TRAFFIC NEEDS STUDY: PHASE I

CST: NONE

$473,000 $2,000,000

PROJECT: 0000593 TYPE WORK: SPECIAL STUDIES

ATLANTA TMA TIP # AR 367B

LENGTH (miles / km)

DESCRPT: REGIONAL TRAFFIC NEEDS STUDY: PHASE 2

FUND:CMAQ 0/0.00

PE: 2002 ROW: NONE CST: NONE

$1,100,000

PROJECT: 0000594 TYPE WORK: SPECIAL STUDIES

ATLANTA TMA TIP # AR 367C

LENGTH (miles / km)

DESCRPT: REGIONAL TRAFFIC NEEDS STUDY: PHASE 3

FUND:CMAQ 0/0.00

PE:2003 ROW: NONE CST: NONE

$500,000

~
u~

PROJECT: 0000595 TYPE WORK: RIDE SHARING

ATLANTA TMA TIP # AR 368

LENGTH (miles / km)

DESCRPT: REGIONAL 13 COUNTY VANPOOL PROGRAM

FUND: CMAQ

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Shure:

OTH Shure:

$3,000,000 $2,400,000
$600,000

Page J55 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FULTON COUNTY

PROJECT: 0000596 TYPE WORK: SPECIAL,STUDIES

ATLANTA TMA TIP # AR 369A

LENGTH (miles I km}

DESCRPT: PERIMETER RAIL CIRCULATOR ANAL YSIS: PHASE I

FUND:CMAQ 010.00

PE:2001 ROW: NONE CST: NONE

$800,000

PROJECT: 0000597 TYPE WORK: SPECIAL STUDIES

ATLANTA TMA TIP # AR 369B

~ LENGTH (miles I km)

DESCRPT: PERIMETER RAIL CIRCULATOR ANALYSIS: PHASE 2

FUND:CMAQ 010.00

PE: 2002 ROW: NONE CST: NONE

$1,200,000

PROJECT: 0000600 TYPE WORK: SPECIAL STUDIES

FUND: CMAQ .

ATLANTA TMA TIP # AR 371A

LENGTH (mileslkm) 010.00

DESCRPT: ARTS CENTER TO CUMBERLAND RAIL ANAL YSIS; PHASE I

PE: 2001 ROW: NONE CST: NONE

$1,200,000

PROJECT: 0000601 TYPE WORK: SPECIAL STUDIES

FUND: CMAQ

ATLANTA TMA TIP # AR 371B

LENGTH (mileslkm) 010.00

DESCRPT: ARTS CENTER TO CUMBERLAND RAIL ANAL YSIS; PHASE 2

PE:2002 ROW: NONE CST: NONE

$2,000,000

PROJECT: 0000602 TYPE WORK: SIGNING

ATLANTA TMA TIP # AR 374

LENGTH (miles I km)

DESCRPT: BUCKHEAD COMMUNITY SHUTTLE (PR & SIGNAGE)

FUND: CMAQ.

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

OTHShare:

PROJECT: 0000603 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ .

ATLANTA TMA TIP # AT AR BP290A

LENGTH (miles I km) 0 10.00

DESCRPT: PEDESTRIAN ~AFETY; AWARENESS & PROMOTION CAMPAIGN; PHASE 2

PE: 2001 ROW: NONE CST: NONE

$215,000 $172,000
$43,000 $100,000

PROJECT: 0000604 TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # AT AR BP050

LENGTH (mileslkm) 0.28/0.45

ROW: LOCL

DESCRPT: VANlRA AVE SIDEWALKS FM CAPITOL AVE TO CONNELEY ST

CST: 2003

FED Share:

OTHShare:

PROJECT: 0000605 TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # AT AR BP102

LENGTH (miles I km) 0.84 11.35

ROW: LOCL

DESCRPT: BOULEVARD AVE SIDEWALKS FM MCDONOUGH TO HAMIL TON

CST: 2003

FED Share:

OTH Share:

$64,000 $51,000 $13,000
$144,000 $115,000 $29,000

Page 156 of336

STATE TRANSPORTATION IJlrIPROVEMENT PROGRAM
9/21/00 --------------,-------_._--~~----....._ ~---~---_._--

FULTON COUNTY

PROJECT: 0000606 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

.!!

ATLANTA TMA TIP # AT AR BPI 06A.

LENGTH (miles I km) 0 10.00 .

PE:NONE ROW: NONE

DESCRPT: BUCKHEAD PED NETWORK: PH I ACCESS TO MARTA RAIL

CST: 2003

FED Share:

$240,000 $192,000

OTHShare:

PROJECT: 0000607 TYPE WORK: SIDEWALKS

FUND: CMAQ

ATLANTA TMA TIP # AT AR BPI20

LENGTH (mileslkm) 3.23/5.20

DESCRPT: HOLLYWOOD RD SIDEWALKS FM BOLTON RD TO BANKHEAD HWY/SR 8

PE:LOCL ROW: LOCL CST: 2003 FED Share:

$48,000
. $480,000 $384,000

OTHShare:

PROJECT: 0000608 TYPE WORK: 'SIDEWALKS

FUND:CMAQ

PE:LOCL

ATLANTA TMA TIP# AT AR BPI27

LENGTH (mileslkm) 3.3/5.31

ROW: LOCL

DESCRPT: MEMORIAL DR SIDEWALKS FM MORELAND AVE/SR 42 TO CANDLER RD

CST: 2003

FED Share:

$96,000
$512,000 $410,000

OTHShare:

PROJECT: 0000609 TYPE WORK: SIDEWALKS

FUND:CMAQ

PE: LOCL

ATLANTA TMA TIP # AT AR BPI32

LENGTH (mileslkm) 2.78/4.48

ROW: LOCL

DESCRPT: ROSWELL RDISR 9 SIDEWALKS FM PEACHTREE RD TO ATLANTA CITY LJ

CST: 2003

FEDShare~

$102,000
$240,000 $192,000

OTHShare:

PROJECT: 0000610 TYPE WORK: SIDEWALKS

FUND:CMAQ

PE:LOCL

ATLANTA TMA TIP # AT AR BPI53

. LENGTH (miles/km) 1.75/2.82

ROW: LOCL

DESCRPT: CHILDRESS DR SIDEWALKS FM CASCADE RD TO CAMPBELL TON RD

CST: 2003

FED Share:

$48,000
$320,000 $256,000

OTHShare:

PROJECT: 000061 I TYPE WORK: SIDEWALKS

FUND: CMAQ

PE:LOCL

ATLANTA TMA TIP # AT AR BPI 54

LENGTH (miles./ km) 1.211 1.95

ROW: LOCL

DESCRPT: COLLIER RD SIDEWALKS FM HOWELL MILL TO PEACHTREE RD

CST: 2003

FED Share:

$64,000
$200,000 $160,000

OTH Share:

PROJECT: 0000612 TYPE WORK: SIDEWALKS

FUND:CMAQ

PE: LOCL

ATLANTA TMA TIP # AT AR BPI57

LENGTH (mileslkm) 0.54/0.87

ROW: LOCL

DESCRPT: DILL AVE SIDEWALKS FM METROPOLITAN PKWY TO SYLVAN RD

CST: 2003

FED Share:

$40,000
$96,000 $77,000

OTHShare:

PROJECT: 0000613 TYPE WORK: SIDEWALKS

FUND:CMAQ

PE:LOCL

ATLANTA TMA TIP # AT AR BPI79

LENGTH (mileslkm) 0.46/0.74

ROW: LOCL

DESCRPT: LAWTON ST SIDEWALKS FM OGLETHORPE AVE TO LUCILLE AVE

CST: 2002

FED Share:

$19,000
$80,000 $64,000

OTHShare:

$16,000

Page J57 of336

,--,-~-~~~~--------------,~~-~=,..,---,----.,.----------~--

-------_._---
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9121100

FULTON COUNTY

PROJECT: 0000614 TYPE WORK: SIDEWALKS

FUND:CMAQ

ATLANTA TMA TIP # AT AR BP209

LENGTH (miles / km) 0.9/1.45

PE:LOCL ROW: LOCL

DESCRPT: WILSON MILL RD SIDEWALKS FM BAKERS FERRY RD TO BOULDER PK DR

CST: 2003

FED Share:

OTHShare:

PROJECT: 0000637 TYPE WORK: SPECIAL STUDIES

FUND: CMAQ

ATLANTA TMA TIP # AT AR 228

LENGTH (miles / kin) 0/0.00

DESCRPT: MARTIN LUTHER KING DRIVE CORRIDOR TRANSPORTATION STUDY

PE: 2003 ROW: NONE CST: NONE

$112,000 $90,000
$22,000 $250,000

PROJECT: 0000638 TYPE WORK: BlCYCLE/PED. FACILITY

FUND: CMAQ

PE:LOCL

ATLANTA TMA TIP # FN AR BPO13

LENGTH (miles / km) 3 /4.83

ROW: LOCL

DESCRPT: BRUICE & SPRUILL RDS FM OLD ALABAMA RD TO JONES BRIDGE RD

CST: 2003

FED Share:

$650,000 $520,000

OT/i Shure:

$130,000

PROJECT: 0000639 TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE:LOCL

ATLANT A TMA TIP # FN AR BP052

LENGTH (miles / km) 2.2 /3.54

ROW: LOCL

DESCRPT: RIVERSIDE DRIVE BlKE/PED FM JOHNSON FERRY RD'TO 1-285

CST: 2003

$1,800,000

FED Share:

$1,440,000

-.

OTHShare:

$360,000

PROJECT: 0000640 TYPE WORK: BICYCLE/PED. FACILITY

FUND:CMAQ

PE:LOCL

ATLANTA TMA TIP # FN AR BP067

LENGTH (miles / km) 0.9/1.45

ROW: LOCL

DESCRPT: RIVER VALLEY RD FM RIVERSIDE DR TO ABERNATHY RD

CST: 2003

FED Share:

$1,200,000 $960,000

OTH Share:

PROJECT: 0000641 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FS AR BP058 .

LENGTH (miles / km)

DESCRPT: SR I 38/JONESBORO RD FM SHANNON PARKWAY TO 1-85

FUND: CMAQ

PE: LOCL

0.3/0.48

ROW: LOCL

CST: 2003

FED Share:

$240,000
$59,000 $47,000

OTHShare:

PROJECT: 0000642 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FS AR BP059

LENGTH (miles/ km)

DESCRPT: LONDONBERRY BIKEIPED FM SR 138 TO MALL BLVD

FUND: CMAQ

PE: LOCL

0.45/0.72

ROW: LOCL

CST: 2003

FED Share:

$12,000
$117,000 $94,000

OTH Share:

PROJECT: 0000643 TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FS AR BP060

LENGTH (miles / km)

DESCRPT: SHANNON PKWY BIKE/PED FM MALL BLVD TO SR 138

FUND: CMAQ

PE:LOCL

0.32 /0.52

ROW: LOCL

CST: 2003

FED Share:

$23,000
$119,000 $95,000

OTH Share:

$24,000

Page J58 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM

9/21/00

...

,..."..,

"'...._ _

. _..

..

._

~,

~.,.<1<_~

"''''_~_,_~

FULTON COUNTY

PROJECT: 0000644 TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # FS AR BP065

LENGTH (miles 1 km) 3.12/5.02

ROW:LOcL'

DESCRPT: SR 1381J0NESBORO RD/BEVE INGRAM FM ROOSEVELT TO BUFFINGTON

CST: 2003

FED Share:

$637,000 $510,000

OTH Share:

PROJECT: 0000645 TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: LOCL

ATLANT A TMA TIP # FS AR BPOn

LENGTH (miles 1 km) 1.42/2.29

ROW: LOCL

DESCRPT: CONNELL RD SIDEWALKS FM BETHSAIDA RD TO FLAT SHOALS RD

CST: 2002

FED Share:

$127,000
$350,000 $280,000

OTH Share:

PROJECT: 0000675 TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE:LOCL

ATLANT A TMA TIP # FS AR BP087

LENGTH (miles 1 km) 0/0.00

ROW: LOCL

DESCRPT: BUFFINGTON RD BIKE LANE FM FLAT SHOALS RD TO ROOSEVELT HWY

CST: 2003

FED Share:

$70,000
$2,730,000 $2,184,000

OTHShare:

PROJECT: 0000717 TYPE WORK: SPECIAL STUDIES

FUND: STP

PE: 200i

ATLANTA TMA TIP # AR 30 IA

LENGTH (miles 1 km) 0/0.00

ROW: NONE

DESCRPT: MAG-LEV TRANSPORTATION TECHNOLOGY DEPLOYMENT PROGRAM-PHASE 2 CST: NONE

$546,000 $3,650,000

PROJECT: OOY0493 TYPE WORK: VEHICLE PURCHASES

FUND: HPP

ATLANTA TMA TIP # AR 269A2B

LENGTH (miles 1 km) 010.00

DESCRPT: COMMUTER RAIL ATLANTA TO ATHENS TRAINSET PURCHASE SEE0000493 PROPOSED TCM

ASSOCIATED PROJECTS: 0000493

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

.$12,500,000 $10,000,000
$2,500,000

PROJECT: 713230- TYPE WORK: BRIDGE REHAB

ATLANTA TMA TIP # FN AR 185

LENGTH (miles 1 km)

DESCRPT: 1-285 @ RIVERSIDE DRI TURN LANES

FUND: 1M 0.26/0.42

PE: 1995 ROW: 2001 CST:

UNDERWAY $400,000
AFTER 2003

PROJECT: 713270- TYPE WORK: j3RIDGES

FUND: 1M

ATLANTA TMA TIP # AT AR 2 I I

LENGTH (miles 1 km) I 11.6 I

DESCRPT: 1-75 ~OUTH TO 1-85 NORTH FLY OVER BRIDGE @ BROOKWOOD STATION

EXIST. LANES: 00 PROPOSED LANES: 01

PE:2001 ROW: CST:

$2,800,000 AFTER 2003 AFTER 2003

PROJECT: 713330- TYPE WORK: INTERCHANGE

ATLANTA TMA TIP # AT AR 178

LENGTH (mileslkm)

DESCRPT: 1-285 SOUTH TO 1-20 WEST INTCHG RECST; WIDEN & CD

EXIST. LANES: 00 PROPOSED LANES: 06

FUND: 1M 3.12/5.02

PE: 1995 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $100,000
$5,703,000 $5,132,700
$570,300

Page 159 of336

..._ _

l' t _ '

STATE TRANSPORTATION IMPROVEMENT PROGRAM

rr_..-... 9/21/00

-......................_ _

~':rs<.~'"

.. .....,.

-.k<

~

FULTON COUNTY

PROJECT: 713370- TYPE WORK: ATMSIITS

FUND: STP

ATLANTA TMA TJP # AR 279

LENGTH (miles I km) 9.45 /15.21

DESCRPT: ATMS/I-285 SURVEIL FM 1-20 WIN FULTN N TO 1-75 IN COBB

ASSOCIATED PROJECTS: 71337L- 71Y370-

PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:

UNDERWAY
$5,137,000 $4,109,600 $1,027,400

PROJECT: 713371- TYPE WORK: ATMS/ITS

FUND: CMAQ

ATLANTA TMA TIP # AR 295

LENGTH (miles I km) 10.7 I 17.26

DESCRPT: ATMS/ ]-285 SURVEIL FM 1-85/UNION CITY NORTH TO 1-20 WEST

PE: 2001 ROW: NONE CST:

$100,000 AFTER 2003

PROJECT: 713372- TYPE WORK: ATMS/ITS

FUND: CMAQ

ATLANTA TMA TIP # AR 281

LENGTH (miles I km) 0 10.00

DESCRPT: ATMSII-285 SURVEIL FM J-75/CLAYTON NE THRU FULTN TO J-20/DEK

ASSOCIATED PROJECTS: 713373-

PE:NONE ROW: NONE CST: NONE

PROJECT: 713690- TYPE WORK: INTERCHANGE

ATLANTA TMA TIP # AT AR 214

LENGTH (miles I km}

DESCRPT: 1-285 AT BANKHEAD HIGHWA Y/SR 8/US 78-278

ASSOCIA TED PROJECTS: 750780-

FUND: NHS 0.2 10.32

PE: 1999 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $1,200,000 $4,485,000 $3,588,000 $897,000

PROJECT: 714190- TYPE WORK: BRIDGES

ATLANTA TMA TIP # AT AR 224A

LENGTH (miles I km)

DESCRPT: NEW 17TH STREET BRIDGE OVER 1-75

FUND: NHS 010.00

PE: 200 I ROW: 2002 CST: 2003 FED Share: GA Share:

$5,000 $50,000,000 $26,000,000 $20,800,000
$5,200,000

PROJECT: 71Y370- TYPE WORK: ATMSIITS

FUND: STP

ATLANTA TMA TIP # AR 279

LENGTH (mileslkm) 9.45 115.21

DESCRPT: ATMS/I-285 SURVEIL FM 1-20 W IN FULTN N TO 1-75/COBB 713370-

ASSOCIATED PROJECTS: 713370-

PE: 1999 ROW: NONE CST: 2003 FED Share: GA Share:

UNDERWAY
$4,312,000 $3,449,600
$862,400

PROJECT: 720570- TYPE WORK: MEDIAN WORK

FUND: NHS

ATLANTA TMA TIP # AT 004

LENGTH (miles I km) 0.51 10.82

DESCRPT: DL HOLLOWELL PKWY/SR 8 FM PROCTOR CRK TO E OF CSX R~ BRIDGE

PE: 1993 ROW: 2000 CST: 2001 FED Share: GA Share:

UNDERWAY $2,125,000 $7,709,000 $6,167,200 $1,541,800

PROJECT: 72177X- TYPE WORK: WIDENING

FUND: STP

ATLANTA TMA TIP # DO 019

LENGTH (miles I km) 0 10.00

DESCRPT: SR 166 FM OLD LOWER RIVER RD TO SR 701 SEE DOUGLAS CO

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 721770-

PE:NONE ROW: NONE CST: NONE

Page 160 of336

r-------=======================================================-------STATE TRANSPORTA110N IMPROVEMENT PROGRAM 9/21/00

FULTON COUNTY

PROJECT: 722090- TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FN AR 190 .

LENGTH (miles I km)

DESCRPT: SR 400 AT WINDWARD PARKWAY

FUND: NHS 0.2 10.32

PE: 1999 ROW: 2000 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY $8,874,000 $7,099,200 $1,774,800

PROJECT: 722140- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: HPP

ATLANTA TMA TIP # FN AR 202

LENGTH (miles I km) 0 10.00

DESCRPT: SR 400 MULTIMODAL TRANSPORTATION CORRIDOR STUDY/CONST

ASSOCIATED PROJECTS: 72Y 140-

PE: 2001. ROW: NONE CST:

$5,000,000 AFTER 2003

PROJECT: 730886- TYPE WORK: BRIDGES

FUND: BRIDGE

PE: 1993

ATLANTATMATIP#FN07IA

LENGTH (miles r km) 0.05/0.08

.ROW: LOCL

DESCRPT: STATE BRIDGE RD @ JOHNS CREEK - NEW PARALLEL BRIDGE

CST: 2003

EXIST. LANES: 00 PROPOSED LANES: 02

FED Share:

ASSOCIATED PROJECTS: 730880-

GA Share:

UNDERWAY
$525,000 $420,000 $105,000

PROJECT: 731510- TYPE WORK: ATMSIITS

FUND: CMAQ

PE:NONE

ATLANTA TMA TIP # AR 294A

LENGTH (mileslkm) 6/9.66

ROW: NONE

DESCRPT: ATMS/ SR 154/166 COMM'CTION/SURVEILLANCE FM 1-285 TO 1-75/85

CST: 2002

FED Share:

GA Share:

$5,055,000 $4,044,000 $1,011,000

PROJECT: 73 I830- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # FS 083

LENGTH (miles'; km) 0.2 10.32

DESCRPT: CAMPBELLTON RD/SR 166 @ BOAT ROCKINEW HOPE ROADS

PE: 1999 ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 731835- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # FN 12 I

LENGTH (miles I km) 1.6/2.58

DESCRPT: SR 120/ABBOTTS BRIDGE ROAD AT JONES BRIDGE ROAD

PE: 1999 ROW: LOCL CST: 2001 FED Share: , GA Share:

UNDERWAY
$370,000 $296,000
$74,000
UNDERWAY
$2,000,000 $1,600,000
$400,000

PROJECT: 731860- TYPE WORK: REPLACEBRIDGE

FUND: BRIDGE

ATLANTA TMA TIP.# FS 138

LENGTH (mileslkm) 0.2210.35

DESCRPT: SR 70/CASCADE-PALMETTO @DEEP CREEK 7.5 MI N OF FAIRBURN

PE: 2000 ROW: 2001 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 731870- TYPE WORK: IJ':JTERSECTION IMPROVEMENT

ATLANTA TMA TIP # AR 157

LENGTH (miles I km)

DESCRPT: SR 91N ROSWELL@KING/CHATTAHOOCHEE STREETS

LUMP SUM PROJECT

FUND: STP 0.2 10.32

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY

$235,000.

$211,500



$23,500

Page 1610/336

STATE TRANSPORTATION IMpROVEMENT PROGRAM
9/21/00

FULTON COUNTY

PROJECT: 731895- TYPE WORK: SIDEWALKS

FUND:CMAQ

ATLANTA TMA TIP # FN AR BP078

LENGTH (miles 1 km) 1.71 12.75

DESCRPT: HOLCOMB BRIDGE RDISR 140 FM SCOTT RD TO BARNWELL RD

PE:LOCL ROW: LOCL CST: 2001

FED Share:

PROJECT: 742482- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # AT AR J 16

LENGTH (miles 1 km) 0.19 10.31

DESCRPT: SR I 66ILAKEWOOD FWY EB EXIT RAMP @ SYLVAN RD

OTH Share:
PE: 2001 ROW: NONE CST:

$625,000 $500,000
$125,000 $5,000
AFTER 2003

PROJECT: 742860- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP #. FN 088

LENGTH (miles 1 km) 1.5212.45

DESCRPT: SPALDING DR FROM MT VERNON RD TO SR 140 @ INTER 174286X

ASSOCIATED PR9JECTS: 74286X-

PE: 1997 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$892,000 $713,600 $178,400

PROJECT: 742970- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # FS 120

LENGTH (miles 1 km) 0.21 0.32

DESCRPT: SR I 54/CASCADE PALMETTO HWY@WILKERSON MILL RD

PE: 1999 ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 742976- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

ATLANTA TMA TIP # FS 142

LENGTH (miles 1 km) 0.2/0.32

ROW: LOCL

DESCRPT: CR I385/BUFFINGTON ROAD@MORNING CREEK TRIB. E/UNION CITY

CST: 2002

FED Share:

GA Share:

UNDERWAY
$250,000 $200,000
$50,000 UNDERWAY
$313,000 $250,400
$62,600

PROJECT: 742990- TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FN 159

LENGTH (miles / km)

DESCRPT: MCGINNIS FERRY RD/CR 1319 AT SARGENT RD/CR 66

FUND: STP 0.2 /0.32

PE: LOCL ROW: 2001 CST: 2001 FED Share:

PROJECT: 750 I05- TYPE WORK: WIDENING

FUND: STP

ATLANTA TMA TIP#AT005

LENGTH (mileslkm) 1.41/2.27

DESCRPT: SR 280IHE HOLMES FM 1-20 TO DL HOLLOWELL PKWY/SR8/US278

EXIST. LANES: 02 PROPOSED LANES: 04

OTHShare:
PE: 2003 ROW: LOCL CST:

$100,000 $375,000 $300,000
$75,000 $568,000
AFTER 2003

PROJECT: 751710- TYPE WORK: WIDENING

FUND: STATE

ATLANTA TMA TIP # ATOl7/FS048

LENGTH (miles / km) 2.1 13.38

DESCRPT: SR 70/FULTON IND BLVD FM INTERCHANGE DR TO SR 8/1NCL CRK BR

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 1994 CST: 2003
GA Share:

UNDERWAY UNDERWAY
$5,557,000
$5,557,000

Page 162 of336

STATE TRANSPORTAl/ON IMPROVEMENT PROGRAM
. 9/21/00

FULTON COUNTY

PROJECT: 752015- TYPE WORK: REPLACE BRIDGE

ATLANTA TMA TIP # AT 070

LENGTH (miles / km)

DESCRPT: COURTLAND ST OVER CSX RR

FUND: BRIDGE

PE: 1992

0.1/0.16

. ROW: LOCL

CST: 2001

FED Share:

GA Share:

. UNDERWAY,
$795,000 $636,000 $159,000

PROJECT: 752020- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1992

ATLANTATMATI~#AT069

' . LENGTH (miles/km) 0.5/0.81

ROW: LOCL

DESCRPT: PEACHTREE ST @ GEORGIA RR & MARTA AT UNDERGROUND ATLANTA

'CST: 2002

FED Share:

GA Share:

. UNDERWAY
$3,509,000 $2,807,200
$701,800

PROJECT: 752030- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 19.92

ATLANTATMATIP#AT068

LENGTH (miles r km) 0.5/0.81

ROW: LOCL

DESCRPT: INTERNATIONAL BLVD@CSX & NORFOLK-SOUTHERN RR@OMNI&75Y030

CST: 2001

FED Share:

ASSOCIATED PROJECTS: .75Y030-

GA Share: .:

UNDERWAY
$4,947,000 $3,957,600
$989,400

PROJECT: 752040- TYPE WORK: REPLACE BRIDGE .

FUND: STP

ATLANTA TMA TIP # AT 009A

LENGTH (miles/km) 0.18/0.29

DESCRPT: ROXBORO RD FM E PACES FERRY RD TO ROCKHAVEN CIR& SOURR BR

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1997 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$5,539,000 $4,431,200 $1,107,800

PROJECT: 752086- TYPE WORK: BRIDGE REHAB

ATLANTA TMA TIP # AT 086A

LENGTH (miles / km)

DESCRPT: SR 999fCS 3586fSPRING STREET OVER CSX RAILROAD

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 752560-

FUND: BRIDGE

PE: 1992

0.5/0.81

ROW: 2000

CST: 2001

FED Share:

GA Share:

UNDERWAY $5,000,000 $2,737,000 $2,189,600
$547,400

PROJECT: 752090- TYPE WORK: WIDENING

FUND: STP

ATLANTATMA TIP # AT 009B

LENGTH (miles Zkm) 0.32/0.52

DESCRPT: ROXBORO ROAD FROM PRICHARD WAY TO EAST PACES FERRY RD

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$1,879,000 $1,503,200
$375,800

PROJECT: 752150- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

PE: 1993

ATLANTA TMA TIP # FN 02 I

LENGTH (miles / km) 0.4 /0.64

ROW: LOCL

DESCRPT: WINDSOR PARK WA YfCR 361 OVER NANCY CREEK .3 MILE EAST SR 400

CST: 2001

FED Share:

GA Share:

UNDERWAY
$963,000 $770,400 $192,600

PROJECT: 752520- TYPE WORK: . REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

ATLANT A TMA TIP # AT 097

LENGTH (miles / km) . 0.29/0.47

ROW: LOCL

DESCRPT: CS I985fMITCHELL STREET@SOUTHERN RAILROAD.2 MI W OF SR 3E

. CST: 2001

FED Share:

GA Share:

UNDERWAY

$3,410,000

$2,728,000 $682,000



Page 163 of336

STATE TRANSPORTAtION IMPROVEMENT PROGRAM
9121100

FULTON COUNTY

PROJECT: 752560- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1998

ATLANTA TMA TIP # AT 086B

LENGTH (miles 1 km) 0.48 10.77

ROW: 2001

DESCRPT: SR 999/CS 3586/SPRING STREET @ SOU RR- CSX RR REPLACEMENT

CST: 2001

FED Share:

ASSOCIATED PROJECTS: 752086-

GA Share:

UNDERWAY $5,000,000 $11,852,000 $9,481,600 $2,370,400

PROJECT: 752570- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

ATLANTA TMA TIP # AT 100

UlNGTH (miles 1 km) 0.22 10.35

ROW: LOCL

DESCRPT: CR 1349/FAIRBURN ROAD @CSX RAILROAD 0l0RTH OF CASCADE RD

CST: 2001

FED Share:

GA Share:

UNDERWAY
$1,167,000 $933,600 $233,400

PROJECT: 752580- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

. ATLANTA TMA TIP # FS 069

LENGTH (miles 1 km) 0.21 10.34

ROW: LOCL

DESCRPT: CR 495/0LD FAIRBURN ROAD @ CAMP CREEK .03MI SCAMP CRK PKY

CST: 2001

EXIST. LANES: 02 PROPOSED LANES: 03

FED Share:

GA Share:

UNDERWAY
$1,407,000 $1,125,600
$281,400

PROJECT: 752860- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANT A TMA TIP # AT 162

LENGTH (miles 1 km) 0.42 10.68

DESCRPT: SR I 54/MEMORIAL DRIVE AT BOULEVARD A VE/CS 520

PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $281,000 $285,000 $228,000 $57,000

PROJECT: 752870- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP#AT 163

LENGTH (miles 1 km) 0.42/0.68

DESCRPT: SR 154/MEMORIAL DRIVE AT MORELAND AVE & DEKALB CO

ASSOCIATED PROJECTS: 75287X-

PE: 1997 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$390,000 $312,000 $78,000

PROJECT: 752960- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

ATLANTATMATIP#FNI74

LENGTH (miles 1 km) 0.2/0.32

ROW: LOCL

DESCRPT: CR I 86/HEMBREE ROAD@ FOE KILLER CREEK 2 MI SW OF ALPHARETTA

CST: 2003

FED Share:

GA Share:

UNDERWAY
$200,000 $160,000
$40,000

PROJECT: 752970- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

ATLANTA TMA TIP # FN 173

LENGTH (miles 1 km) 0.2 10.32

ROW: LOCL

DESCRPT: CR I332/0LD ROSWELL ROAD@FOE KILLER CREEK 2.7 MI S OF ALPH

CST: 2002

FED Share:

GA Share:

UNDERWAY
$400,000 $320,000
$80,000

PROJECT: 752980- TYPE WORK: BRIDGES

FUND: STP

ATLANTA TMA TIP # FS 088

LENGTH (miles 1 km) 0.2/0.32

DESCRPT: FAYETTEVILLE RD/CR 1316 GRADE SEPARATION AT CSX RAILROAD

PE: 1999 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$2,500,000 $2,000,000
$500,000

Page 164 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM

9/21/00 ..--.-......- - . , - - - - . " -...-.""---.-..-""" .."""--_:"..-.., ~ '''''...". _ _'

41._..""_ _"_.0__,.,..,_:,"'"'.,,"",___ ...._."'.."",.,,.,._...

FULTON COUNTY

PROJECT: 753050- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # FS 073

LENGTH (miles / km) 1.31 /2.11

DESCRPT: CR 4 I76/CASCADE RD FM DANFORTH RD TO ALTANTA CITY LIMITS

PE: 1999 ROW: LOCL CST: 2002 FED Share:

UNDERWAY
$600,000 $480,000

OTH Share:

PROJECT: 753052- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP'

ATLANTA TMA TIP # FS 116

LENGTH (miles / km) 2.97/4.78

DESCRPT: FLAT SHOALS RDICR 1384 FM 1-85 TO OLD NATIONAL HWYIADD MEDIAN

PE: 1999 ROW: LOCL CST: 2001 FED Share:

orn ss.o-.

PROJECT: 753054- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # FN 103

LENGTH (miles / km) I. I6/1.87

DESCRPT: GLEN RIDGE DR/CR 351 FM ROSWELL RD TO GLENRIDGE CONN & MEDIAN

PE: LOCL ROW: LOCL CST: 2001 FED Share:

<,
OTH Share:

PROJECT: 753125- TYPE WORK: INTERSECTION IMPROVEMEN~

FUND: STP

ATLANTA TMA TIP # FN 119

LENGTH (miles / km) 0.08 /0.13

DESCRPT: NESBIT FERRY RD/CR 108 @ BRUMBELOW ~D '

PE: 1999 ROW: LOCL CST: 2001 FED Share:

$120,000 UNDERWAY $1,500,000 $1,200,000
$300,000
$600,000 $480,000 $120,000 UNDERWAY $250,000 $200,000

PROJECT: 753130- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # FN 117

LENGTH (miles / km) 0.21 /0.34

DE.SCRPT: NESBIT FERRY ROAD/CR 108 AT SCOTT ROAD

OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

$50,000 UNDERWAY
$280,000 $224,000

PROJECT: 753135- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # FN 118

LENGTH (miles / km) 0.62/1.00

DESCRPT: NESBIT FERRY ROAD/CR 108 AT ARBOR WOODS DRIVE/CR 2608

OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

$56,000 UNDERWAY
$200,000 , $160,000

PROJECT: 753140- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # FS 084

, LENGTH (miles / km) 0.2/0.32

DESCRPT: CASCADE RD/CR 4176 @CARLO WOODS DR/CASCADE OVERLOOK RD

OT/! Share:
PE: 1999 ROW: LOCL CST: 2001 FEDShllre:

$40,000 UNDERWAY
$350,000 $280,000

PROJECT: 753145- TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FS 076

LENGTH (miles / km)

DESCRPT: CAMP CREEK PKWY/SR 6 AT BUTNER RD/CR 1374

FUND: STP 0.2 /0.32

OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:

$70,000 UNDERWAY
$150,000 $120,000

OTH Share:

$30,000

Page 165 of336

STATE TRANSPORTAI10N IMPROVEMENT PROGRAM
_---,----- 9/21/00
--~'--------'----'----'-" ...

FULTON COUNTY

PROJECT: 753220- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

ATLANTA TMA TIP # FN 171

LENGTH (miles r km) 0.2/0.32

ROW: LOCL

DESCRPT: CR 1324/BETHANY ROAD @COOPER SANDY CREEK 3.0 MI N OF ALPHAR

CST: 2002

FED Share:

GA Share:

$40,000
$802,000 $641,600 $160,400

PROJECT: 753235- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # FN 156

LENGTH (miles / km) 0.2 10.32

DESCRPT: PEACHTREE DUNWOODY RD/CR 143) @ JOHNSON FERRY ROAD

PE: 2000 ROW: 2001 CST:

UNDERWAY $58,000
AFTER 2003

PROJECT: 753240- TYPE WORK: BICYCLE/PED. FACILI.TY

ATLANTA TMA TIP # FN 161

LENGTH (miles / km)

DESCRPT: ROSWELL RD FM ABERNATHY RD TO HAM]vIOND DR

FUND: STP 1.44/2.32

PE:LOCL ROW: 2001 CST: 2001 FED Share:

PROJECT: 753245- TYPE WORK: SIDEWALKS

FUND: STP

ATLANTA TMA TIP # FN AR BP091

LENGTH (miles 1 km) 0.96/1.55

DESCRPT: WINDSOR PKWY/CR 361 FM ROSWELL RD TO GA 400

OTH Share:
PE:LOCL ROW: 2001 CST:

$796,000 $2,755,000 $2,204,000
$551,000
$60,000 AFTER 2003

PROJECT: 753250- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # FN AR BP089

LENGTH (miles / km) 2.5/4.03

DESCRPT: MT VERON HWY/CR 1318 FM HEARD'S FERRY RD TO ROSWELL RD

PE: 2000 ROW: 2001 CST: 2001 FED Share:

PROJECT: 753255- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # FS 130

LENGTH (miles / km) 2.02/3.25

DESCRPT: FAIRBURN RD FM GARRISON DR TO CSX RR & SIDEWALKS; BIKE


OTH Share:
. PE:LOCL ROW: 2001 CST: 2001 FED Share:

OTH Share:

PROJECT: 753260- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # FN 157

LENGTH (miles / km) 0.3 10.48

DESCRPT: NORTHSIDE DR @RIVERVIEW RD/CR291 & OLD POWERS FERRY RD/CR293

PE:LOCL ROW: 2001 CST: 2001 FED Share:

OTH Share:

PROJECT: 753275- TYPE WORK: SIDEWALKS

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # FS AR BP063

LENGTH (miles / km) 3.05/4.91

ROW: LOCL

DESCRPT: CASCADE RD/CR 4176 FM DANFORTH RD TO FULTON INDUSTRIAL BLVD

CST: 2001

FED Share:

OTH Share:

UNDERWAY $125,000 $350,000 $280,000
$70,000
$220,000 $1,800,000 $1,440,000
$360,000
$75,000 $343,000 $274,000
$69,000
$625,000 $500,000
$125,000

Page 166 0/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00 ,--_._--_._--_._.._--

FULTON COUNTY

PROJECT: 753280- TYPE WORK: SIDEWALKS

FUND: CMAQ

ATLANTA TMA TIP # FS AR BP062

LENGTH (miles f km) 0.42/0.68

DESCRPT: NEW HOPE RD/CR 473 FM DANFORTH RD TO CASCADE RD

PE:LOCL ROW: LOCL CST: 2001

FED Share:

$250,000 $200,000

OTH Share:

PROJECT: 753285- TYPE WORK: SIDEWALKS

FUND:CMAQ

PE: LOCL

ATLANT A TMA TIP # FS AR BP070

LENGTH (miles / km) 0.7/1.13

ROW: LOCL

DESCRPT: WASHINGTON RD/CR 1389 FM ROOSEVELT HWY TO E POINT CITY LIM

CST: 2001

FED Share:

$50,000
$200,000 $160,000

OTH Share:

PROJECT: 753300- TYPE WORK: SIDEWALKS

FUND: CMAQ

PE:LOCL

ATLANTA TMA TIP # FN AR BP083

LENGTH (miles / km) 0.86/1.38

ROW: LOCL

DESCRPT: HAMMOND DR FM GLENRIDGE DR TO DEKALB COUNTY

CST: 2001

FED Share:

$40,000
$625,000 $500,000

OTH Share:

PROJECT: 753305- TYPE WORK: SIDEWALKS

FUND:CMAQ

PE:LOCL

ATLANTA TMA TIP # FN AR BP081

LENGTH (miles / km) 1.18 / 1.90

ROW: LOCL

DESCRPT: DUNWOODY PLACE FM ROSWELL RD TO NORTHRIDGE RD .

CST: 2001

FED Share:

$125,000
$350,000 $280,000

OTH Share:

PROJECT: 753310- TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # FS AR BP067B

LENGTH (miles/km) 1.5412.48

ROW: LOCL

DESCRPT: ROOSEVELT HWY/SR 14 FM WELCOME ALL RD TO BUFFINGTON RD: PH 2

. CST: 2001

FED Share:

$70,000
$625,000 $500,000

OTH Share:

PROJECT: 753315- TYPE WORK: SIDEWALKS

FUND:CMAQ

PE:LOCL

ATLANTA TMA TIP # FN AR BP075

LENGTH (miles / km) 0.44 / 0.71

ROW: LOCL

DESCRPT: NORTHRIDGE RD SIDEWALKS FM ROSWELL RD TO SR 400

CST: 2001



FED Share:

$125,000
$250,000 $200,000

PROJECT: 753320- TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # FN 158

LENGTH (miles / km)

DESCRPT: CRABAPPLE.RD/CR 1441 @RUCKERRD/CR 1331

FUND: STP 0/0.00

OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$50,000
$360,000 $288,000

PROJECT: 753325- TYPE WORK: !3ICYCLEIPED. FACILITY

FUND: STP

ATLANTA TMA TIP # FN AR BP095

LENGTH (miles / km) 0.3 /0.48

DESCRPT: MANSELL RD FM WESTSIDE PKWY TO OLD ROSWELL RD

OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

$72,000
$550,000 $440,000

$'110,000

Page 167 of336

STATE TRANSpORTATION IMPROVEMENT PROGRAM
9/21/00

FULTON COUNTY

PROJECT: 75Y030- TYPE WORK: REPLACE BRIDGE

FUND: STP

ATLANTA TMA TIP # AT 068B

LENGTH (miles / km) 0.5 /0.81

DESCRPT: INTERNATIONAL BLVD @ CSX &. NS RR @OMNI FOR STP $/ 752030

ASSOCIATED PROJECTS: 752030-

PE: 1992 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$4,947,000 $3,957,600
$989,400

PROJECT: 75Y660- TYPE WORK: WIDENING

FUND: STP

ATLANTA TMA TIP # FN 028B

LENGTH (miles / km) 3.9/6.28

DESCRPT: OLD ALABAMA RD FM JONES BRDG RD TO SR 141 - FOR ADDL'RW

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 752660-

PE: 1996 ROW: 2003 CST: NONE

UNDERWAY $11,300,000

PROJECT: 762330- TYPE WORK: WIDENING

FUND: STP

ATLANTA TMA TIP # AT 049

LENGTH (miles / km) 1.36 /2. I9

DESCRPT: LENOX ROAD FROM CANTERBURY RD TO FERNCLIFF RD IN ATLANTA

EXIST. LANES: 02 PROPOSED LANES: 04

PE: LOCL ROW: 2001 CST:

$2,900,000 AFTER 2003

PROJECT: 762380- TYPE WORK: INTERCHANGE

ATLANTA TMA TIP # AT AR 212

LENGTH (miles / km)

DESCRPT: SR 400/1-85 CONNECTOR RAMPS

EXIST. LANES: 00 PROPOSED LANES: 02

FUND:NHS 0/0.00

PE: 2001 ROW: NONE CST:

$2,500,000 AFTER 2003

PROJECT: 762465- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # M AR 246B

LENGTH (miles / km) 0/0.00

DESCRPT: PHASE II BUCKHEAD STATION N CONCOURSE (PEDESTRIAN BRIDGE)

PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 762472- TYPE WORK: VEHICLE PURCHASES

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # M AR 237B

LENGTH (miles / km) 0/0.00 .

ROW: LOCL

DESCRPT: MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB

CST: 2001

FED Share:

ASSOCIATED PROJECTS: 76247X-

OTH Share:

PROJECT: 762516- TYPE WORK: BICYCLE/PED. FACILITY

ATLANT A TMA TIP # AT AR BPO14

LENGTH (miles / km)

DESCRPT: MULTIUSE TRAIL FM FREEDOM PK TO CENTENNIAL PK

FUND: CMAQ 0/0.00

PE: 1995 ROW: LOCL CST: 2001 FED Share:

PROJECT: 762518- TYPE WORK: SIDEWALKS

FUND: STP

ATLANTA TMA TIP # AT AR BPI38

LENGTH (miles/km) 0/0.00

DESCRPT: LINDBERGH DR FM PEACHTREE RD TO CHESHIRE BRIDGE ROAD

OTH Share:
PE: 1995 ROW: LOCL CST: 2001 FED Share:

OTH Share:

$6:925,000 $5,540,000 $1,385,000
$1,000,000 $800,000 $200,000
UNDERWAY $750,000 $600,000 $150,000
UNDERWAY $1,233,000
$986,000 $247,000

Page J68 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00

FULTON COUNTY

PROJECT: 762520- . TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE: 1995

ATLANTA TMA TIP # FS AR BP029A

LENGTH (miles / km) 0/0.00

ROW: LOCL

DESCRPT: PARKWAY TRAIL PH I--VIRGINIA AVE TO MARTA RAIL STATION

CST: 2001

FED Share:

OTH Share:

PROJECT: 762522- TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE: 1995

ATLANTA TMA TIP # FS AR BP029D

LENGTH (miles / km) 0 /0.00

ROW: LOCL

DESCRPT: PKWY TRAIL PH IV/CAMP TRUITT RD TO BRANNON PK TO TUBMAN ELEM

CST: 2001

FED Share:

OTHShare:

PROJECT: 762525- TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE: 1995

ATLANTA TMA TIP # FS AR BP032

LENGTH (miles/km) 0/0.00

ROW: LOCL

DESCRPT: PHOENIX TRAIL FM COMMERCE GATEWA Y TO PHOENIX GATEWAY

CST: 2001

FED Share:

PROJECT: 762527-. TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # FS AR BP034

LENGTH (miles / km)

DESCRPT: DANFORTH RD FM CASCADE RD TO NEW HOPE RD

OTHShare:

FUND: CMAQ

PE: 1995

0/0.00

ROW: LOCL

CST: 2001

FED Share:

PROJECT: 762529- TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # FS AR BP035

LENGTH (miles / km)

DESCRPT: FLAT SHOALS RD FM 1-85 TO OAKLEY RD

OTH Share:

FUND:CMAQ

PE: 1995

0/0.00

ROW: LOCL

CST: 2001

FED Share:

OTHShare:

PROJECT: 762530- TYPE WORK: SIDEWALKS

ATLANTA TMA ;f1P # AT 159

LENGTH (miles / km)

,DESCRPT: METROPOLITAN AVE FM NORTHSIDE DR TO CITY LIMITS

FUND: CMAQ

PE: 1995

0/0.00

ROW: LOCL

CST: 2001

FED Share:

ottt suoe.

PROJECT: 762548- TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # AT AR BP023

LENGTH (miles / km)

DESCRPT: BOLTON RD FM MARIETTA BLVD TO JACKSONPKWY

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 762550- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # AT AR BP024

LENGTH (miles / km) 0/0.00

DESCRPT: BOLTON RD FM JACKSON PKWY TO DL HOWELL PARK WAY

OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

UNDERWAY $343,000 $274,000 $69,000
UNDERWAY $265,000 $212,000 $53,000
UNDERWAY $1,197,000 $958,000 $239,000
UNDERWAY $357,000 $286,000 $71,000
UNDERWAY $357,000 $286,000 $71,000
UNDERWAY $929,000 $743,000 $186,000
$392,000 $314,000
$78,000
$,397,000 $318,000
$79,000

PageJ690j336

"_..4.. ~

=<--.... _ ~. _

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00



" " " " " " " . - . c : _ _;

,

:X_,;""""': ..._ _- . . . ~ _ _ . _ ~_ _._...

FULTON COUNTY

PROJECT: 762554- TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # AT AR BPI 2 I

LENGTH (miles I km)

DESCRPT: HOWELL MILL RD FM NORTHSIDE PKWY TO COLLIER RD

FUND:STP 010.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 762556- TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE: LOCL

ATLANTATMATIP#ATARBPI35

LENGTHfmileslkm) 010.00

ROW: LOCL

DESCRPT: WEST PACES FERRY RD FM PEACHTREE RD TO CITY LIMITS

CST: 2001

FED Share:

PROJECT: 762562- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # AT AR BP098

LENGTH (miles I km) 010.00

DESCRPT: WEST END RAIL MULTI-USE TRAIL FM SIMPSON RD TO PRYOR ROAD

OTH Share:
PE: 1999 ROW: LOCL CST: 2002 FED Share:

PROJECT: 762563- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # AT AR BP282

LENGTH (miles I km) 5.39 18.68

DESCRPT: FAIRBURN RD/CR 1349 FM MLK JR DR TO STONE RD BIKE LANES

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 762565- TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # FS AR BP079

LENGTH (miles I km)

DE~CRPT: DOWNTOWN UNION CITY AT VARIOUS LOCATIONS

OTH Share:

FUND:CMAQ

PE: LOCL

010.00

ROW:LOCL

CST: 2001

FED Share:

OTH Share:

PROJECT: 762590- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # AR 157

LENGTH (mileslkm) 0.6/0.97

DESCRPT: SR 54IUNIVERSITY AVE/MCDONOUGH AT CAPITOL/RIDGE/GAMMON AVE

LUMP SUM PROJECT

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

$682,000 $546,000 $136,000
$200,000 $160,000 $40,000 UNDERWAY $1,095,000 $876,000 $219,000
$1,400,000 $1,120,000
$280,000
$525,000 $420,000 $105,000 UNDERWAY $399,000 $359,100 $39,900

PROJECT: 762600- TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # AT AR BP280A

LENGTH (miles I km)

DESCRPT: CITY OF ATLANTA SIDEWALKS @ 12 SCHOOLS/ PH I

PROJECT: 762601- TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # AT AR BP280B

LENGTH (miles I km)

DESCRPT: CITY OF ATLANTA SIDEWALKS @ 12 SCHOOLS/ PH 2

FUND:STP 010.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

FUND:STP 010.00

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

$1,190,000 $952,000 $238,000 .
$1,197,000 $958,000' $239,000

Page 170 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FULTON COUNTY

. PROJECT: 762602- TYPE WORK: SIDEW ALKS

FUND: STP

ATLANTA TMA TIP # AT AR BP278

LENGTH (miles 1 km) 0.671 1.08

DESCRPT: DECATUR ST FM MLK MARTA STAT TO MLK VISTORS CTRJSTREETSCAPES

PE:LOCL ROW: LOCL CST: 2002 FED Share:

$836,000 $669,000

PROJECT: 762603-. TYPE WORK: SIDEWALKS

FUND: STP

ATLANTA TMA TIP # AT AR BP283

LENGTH (miles 1 km) 0.62 1 1.00

DESCRPT: PIEDMONTRD FM MARTA OVERPASS TO PHARR RD STREETSCAPES

OTH Share:
PE: LOCL ROW: LOCL
est. 2001
FED Share:

$167,000
$350,000 $280,000

PROJECT: 762604- TYPE WORK: SIDEWALKS

FUND: STP

ATLANTA TMA TIP # AT AR BP277

. LENGTH (miles 1 km) 1.53 12.46

'DESCRPT: BOULEV ARD/CS 520 STREETSCAPE FROM 1-20TO MLK JR

OTHShare:
PE:LOCL ROW: LOCL CST: 2002 FEDShllre:

$70,000
$2,295,000 $1,836,000

PROJECT: 762605- TYPE WORK: SIDEWALKS

FUND: STP

ATLANTA TMA TIP # AT AR BP284

LENGTH (miles 1 km) 0.24 10.39

DESCRPT: GRANT ST FM MLK MARTA STATION/DECATUR ST TO MEMORIAL DR

OTHShare:
PE: LOCL . ROW: LOCL CST: 2001 FED Share:

$459,000
$380,000 $304,000

PROJECT: 762606- TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # FN AR BP082

LENGTH (miles 1 km)

DESCRPT: ROSWELL RD/SR 9 FM 1-285 TO ATLANTA CITY LIMIT

FUND: STP 2.25 13.62

OTHShare:
PE: 2000 ROW: 2001 CST: 2001 FED Share:

$76,000
UNDERWAY $50,000
$900,000 $720,000

PROJECT: 762607- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP# AT ARBP287

LENGTH (mileslkm) 0.61/0.98

DESCRPT: CHEROKEE AVE/CS 2227 FM MEMORIAL DR !O AUGUSTA AVE (ZOO)

OTHShare:
PE:LOCL ROW: LOCL . CST: 2001 FED Share:

$180,000
$405,000 $324,000

PROJECT: 762608-. TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # AT AR BP288

LENGTH (miles 1 km) 1.6I 12.59

DESCRPT: 10TH FM JUNIPER TO MONROE & PIEDMONT FM 10TH TO WESTMINSTER

OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$81,000
$1,800,000 $1,440,000

OTH Share:

PROJECT: 762610- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # AT AR BP286

LENGTH (miles I km) 010.00

DESCRPT: RANDOLPH AVE/LAKE AVE FM EDGEWOOD AVE TO LITTLE FIVE POINTS

PE:LOCL ROW: LOCL CST: 2002
reo sss-

$360,000
$956,000 $765,000

OTHShare:

$191,000

Page 171 0/336

- - - --- ._- -_.. _---------------

STATE TRANSPORTATION IMPROVEMENT PROGRAM

__--_ _"'-------_. . ... .. . ~_ ..,~-,..~.--_ .........""""-,

........

9/21/00
.."'

--.....-"".... ..""__

...

"'~_

""_"'_...w_~~"'

__
~~_"""

FULTON COUNTY

PROJECT: 762613- TYPE WORK: SIDEWALKS

FUND: CMAQ

. PE:LOCL

ATLANTA TMA TIP # AT AR BP29IB

LENGTH (miles/km) 0/0.00

ROW: LOCL

DESCRPT: SE ATLANTA ALONG MANIGAULT; FUNSTON ST; LAKEWOOD AVE

CST: 2001

FED Share:

$443,000 $354,000

OTHShare:

PROJECT: 762614- TYPE WORK: SIDEWALKS

FUND:CMAQ

PE: LOCL

ATLANTA TMA TIP # AT AR BP29 IA

LENGTH (miles / km) 0/0.00

ROW: LOCL

DESCRPT: SW ATLANTA ALONG OGLETHORPE AVE; ROSE CIR; MCMURRA Y DR

CST: 2001

FED Share:

$89,000
$418,000 $334,000

OTH Share:

PROJECT: 762615- TYPE WORK: SIDEWALKS

FUND:CMAQ

PE: LOCL

ATLANTA TMA TIP # FN AR BP085

LENGTH (miles / km) 0.51 /0.82

ROW: LOCL

DESCRPT: TROWBRIDGE RD FM DALRYMPLE RD TO ROSWELL RD

CST: 2001

FED Share:

$84,000
$250,000 $200,000

PROJECT: 762616- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # FN AR BP084

LENGTH (miles / km) I.3 7 12.2 I

DESCRPT: WILLEO RD/RIVERSIDE DR FM COBB COUNTY TO AZALEA DR

OTH Share:
PE: LOCL ROW: LOCL CST: 2002 FED Share:

$50,000
$350,000 $280,000

OTHShare:

PROJECT: 762620- TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE:NONE

ATLANTA TMA TIP # AR BP003B

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: ATLANTA REGION BICYCLE & MULTI-USE TRAIL PLANNING - PH 2

. CST: 2001

FED Share:

$70,000
$140,000 $112,000

OTH Share:

PROJECT: 762624- TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE:LOCL

ATLANTA TMA TIP # AT AR BP293

LENGTH (miles / km) 1.5 /2.42

ROW: LOCL

DESCRPT: PEACHTREE HILLS FM PEACHTREE TO LINDBERGH & SIDEWALKS

CST: 2001

FED Share:

$28,000
$1,075,000 $860,000

PROJECT: 762630- TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # AT 185

LENGTH (miles / km)

DESCRPT: CHESHIRE BRIDGE/SR 13 @ LINDBERGH DRiSR 236

FUND:STP 0/0.00

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Shure:

$215,000
$1,000,000 $800,000

PROJECT: 762632- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # AT 184

LENGTH (miles rkm) 0/0.00

DESCRPT: PIEDMONT RD/SR 237 @ SIDNEY MARCUS & LINDBERGH DR

OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$200,000
$2,500,000 $2,000,000

OTH Share:

$500,000

Page 172 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FULTON COUNTY

PROJECT: 770302- TYPE WORK: RAIL PROJECTS

ATLANT A TMA TIP # AR 344B .

LENGTH (miles / km)

DESCRPT: COMMUTER RAIL PROGRAM MANAGEMENT - PHASE 2 PROPOSED TCM

FUND: OTHER 0/0.00

PE: 2001 ROW: NONE CST: NONE

$1,550,000

PROJECT: 770303- TYPE WORK: RAIL PROJECTS

ATLANTA TMA TIP # AR 344C

LENGTH (miles / km)>

DESCRPT: COMMUTER RAIL PROGRAM MANAGEMENT - PHASE 3

PROPOSED TCM

.

FUND: OTHER 0/0.00

PE: 2002 ROW: NONE CST: NONE

$2,700,000

PROJECT: 770310- TYPE WORK: RAIL PROJECTS

FUND:HPP

ATLANTA TMA TIP # AR 120A

LENGTH (miles / km) 0.5 /0.81

DESCRPT: ATLANTA MULTI-MODAL PASSENGER TERMINAL PHASE I; CT I PROPOSED TCM

ASSOCIATED PROJECTS: 77Y310-

PE: 1993 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$19,525,000 $15,620,000
$3,905,000

PROJECT: 770311- TYPE WORK: RAIL PROJECTS

FUND: NHS

ATLANTA TMA TIP# AR 120B

LENGTH (miles/km) 0/0.00

DESCRPT: ATLANTA MULTI-MODAL PASSENGER TERMINAL PHASE I; CT 2

PROPOSED TCM

PE: 1993 ROW: NONE CST: 2002 FED Share: GA Share:

UNDERWAY
$10,000,000 $8,000,000 $2,000,000

PROJECT: 770315 TYPE WORK: RAIL PROJECTS

FUND:NHS

ATLANTA TMA TIP # AR 269A

LENGTH (miles / km) 0/0.00

DESCRPT: COMMUTER RAIL ATLANTA TO DACULA (ATHENS) PHASE I PROPOSED TCM

PE: 200\ ROW: 2001 CST: 2001 FED Share: GA Share:

$9,999,000 $1,000,000 $14,000,000 $11,200,000 $2,800,000

PROJECT: 770316- TYPE WORK: RAIL PROJECTS

FUND:NHS

ATLANTATMA TIP#.AR269B

LENGTH (miles/km) 0/0.00

DESCRPT: COMMUTER RAIL ATLANTA TO DACULA (ATHENS) PHASE 2 PROPOSED TCM

PE:NONE ROW: 2002 CST: 2002 FED Share: GA Share:

$5,000,000 . $40,000,000
$32,000,000 $8,000,000

PROJECT: 770320- TYPE WORK: RAIL PROJECTS

FUND: HPP

ATLANTA TMA TIP # AR 268A

LENGTH (miles / km) 0/0.00

DESCRPT: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON) PHASE I

PROPOSED TCM

PE: 2001 ROW: 2001 CST: 2001 FED Share: GA Share:

$6,000,000 $5,000,000 $6,000,000 $4,800,000 $1,200,000

PROJECT: 770321 TYPE WORK: RAILPROJECTS

. FUND:NHS

ATLANTA TMA TIP # AR 268B

LENGTH (miles / km) 0 10.00

DESCRPT: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON) PHASE 2 & 77Y321 PROPOSED TCM

ASSOCIATED PROJECTS: 77Y321-

PE:NONE ROW: 2002 CST: 2002 FED Share: GA Share:

$5,000,000 $14,000,000 $11,200,000
$2,800,000

Page 173 of336

__ ._--- . .- --_.-._._---_. ------------------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FULTON COUNTY

PROJECT: 770873- TYPE WORK: ATMS/ITS

FUND: CMAQ

ATLANTA TMA TIP # AR 20 I B

LENGTH (miles / km)

0/0.00

DESCRPT: ATMSI ARTERIAL ROUTES IN ATL-INSTALL COMM CABLE & HDW/DEKALB

PE:NONE ROW: NONE CST: 2001

FED Share:

GA Share:

$1,000,000 $800,000 $200,000

PROJECT: 770900- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

ATLANTA TMA TIP # FN 095

LENGTH (miles r km) 0.37/0.60

ROW: LOCL

DESCRPT: CS 3101/GRIMES BRiDGE ROAD@BIG CREEK IN SOUTH ROSWELL

CST: 2001

FED Share:

GA Shure:

UNDERWAY
$2,214,000 $1,771,200
$442,800

PROJECT: 770923- TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # FN AR 177C

LENGTH (miles / km)

DESCRPT: OLD ALABAMA FM RIVERSIDE DR TO MARKET BLVD

FUND:CMAQ

PE: 1995

1.2 / 1.93

ROW: NONE

CST: 2001

FEDShllre:

OTHShare:

PROJECT: 771090- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1998

ATLANTA TMA TIP # FN 115

LENGTH (miles / km} 0.2/0.32

ROW: LOCL

DESCRPT: CR 34/FREEMANVILLE ROAD@CHICKEN CREEK 2.5 MI N ALPHARETTA

CST: 2001

FED Share:

GA Share:

UNDERWAY
$332,000 $266,000
$66,000
UNDERWAY
$550,000 $440,000 $110,000

PROJECT: 771102- TYPE WORK: ATMS/ITS

FUND: CMAQ

PE:NONE

ATLANTA TMA TIP # FN/S AR 193C

LENGTH (miles / km)

0/0.00

ROW: NONE

DESCRPT: ATMS: REPLACEMENT AND MAINTENANCE OF EDP EQUIPMENT

CST: 2003

FED Share:

GA Share:

$1,000,000 $800,000 $200,000

PROJECT: 771103- TYPE WORK: ATt\1S/ITS

FUND: CMAQ

ATLANTA TMA TIP # AR 286

LENGTH (miles / km) 0/0.00

DESCRPT: ATMS: REPLACEMENT AND MAINTENANCE OF EDP EQUIPMENT - 2001

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$1,000,000 $800,000 $200,000

PROJECT: 771 I 15- TYPE WORK: SIGNALS

FUND: CMAQ

ATLANTA TMA TIP # M AR 164C

LENGTH (miles/km) 0/0.00

DESCRPT: MARTA OPERATION ENHANCEMENT-SIGNAL PRIORITY SYSTEM (I CORRI)

PE.NONE ROW:NONE
CST: 2003 FED Share:

OTHShare:

PROJECT: 771130- TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE: LOCL

ATLANTA TMA TIP # FS AR I77C

LENGTH (miles / km)

0 /0.00

ROW: LOCL

DESCRPT: SIDEWALKS AND BIKE LANES ON US 29/MAIN STREET/COLLEGE PARK

CST: 2002

FEDShllre:

OTH Shure:

$200,000 $160,000 $40,000
$375,000 $300,000
$75,000

Page J 74 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FULTON COUNTY

PROJECT: 771131- TYPE WORK: BICYCLE/PED. FACILITY

ATLANTA TMA TIP # AT AR 177F

LENGTH (miles / km)

DESCRPT: BICYCLE PARKING RACKS

FUND:CMAQ

PE: LOCL

0/0.00

ROW: LOCL

CST: 2001

FED Share:

OTH Share:

PROJECT: 771141- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

. ATLANTA TMA TIP # AR 221 C

LENGTH (miles / km) 0 /0.00

DESCRPT: START-UP FUNDS FOR TRANSPORTATION MANAGEMENT ASSN-TMA PH-3

PE: 2001 ROW: NONE CST: NONE

$63,000 . $50,000
$13,000 $1,500,000

PROJECT: 771145- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 297B

LENGTH (miles / km) 0/0.00

DESCRPT: CLEAN AIR CAMPAIGN (AIR QUALITY INFORMATION PROGRAM) YEAR 4

PE: 2001 ROW: NONE CST: NONE

$2,500,000

PROJECT: 771146- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 297C

LENGTH (miles / km) 0/0.00

DESCRPT: CLEAN AIR CAMPAIGN (AIR QUALITY INFORMATION PROGRAM) YEAR 5

PE: 2002 ROW: NONE CST: NONE

$2,500,000

PROJECT: 771148- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP

ATLANTA TMA TIP # AR 287B

LENGTH (miles / km) 0/0.00

DESCRPT: CLEAN AIR SPECIAL IN ITATIVE - YEAR 2

.PE: 2001 , ROW:NONE
CST: NONE

$2,000,000

PROJECT: 771149- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP

ATLANTA TMA TIP # AR 287C

LENGTH (miles / km) 0/0.00

DESCRPT: CLEAN AIR SPECIAL IN ITATIVE - YEAR 3

PE: 2002 ROW: NONE CST: NONE

$2,000,000

PROJECT: 771200- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

ATLANTA TMA TIP # FN 166

LENGTH (miles / km) 0.2 /0.32

ROW: LOCL

DESCRPT: CR I88/UPPER HEMBREE ROAD@ FOE KILLER CREEK 2 MI SW OF ALPH

CST: 2002

FED Share:

GA Share:

UNDERWAY
$749,000 $599,200 $149,800

PROJECT: 771228- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # FN AR BPO14

LENGTH (miles / km) 0/0.00

DESCRPT: MANSELL ROAD/CR 126 FROM BIG CREEK TO MARTA PARKING LOT

PE:LOCL ROW: LOCL CST: 2001, FED Share: ,
OTH Share:

$981,000 $785,000

$196,000

Page 175 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

--_._._------_._- __ _-_. .. ._-_. . -__----,-_.--~_.

9/21/00
--'-_._--~~--,,_.,----

__._.",--

FULTON COUNTY

PROJECT: 771240- TYPE WORK: SIDEWALKS

FUND: STP

ATLANTA TMA TIP # FN AR BPOl5

LENGTH (miles 1 km) 010,00

DESCRPT: AZALEA DRIVE/FROM WILLEO ROAD TO SR 9/ROSWELL ROAD

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$812,000 $650,000

PROJECT: 771250- TYPE WORK: BICYCLE/PED, FACILITY

FUND: STP

ATLANTA TMA TIP # FS AR BP028

LENGTH (miles / km) 010.00

DESCRPT: ON-STREET BICYCLE & PEDESTRIAN WALKS & TRAILS/COLLEGE PARK

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$162,000
$504,000 $403,000

PROJECT: 771254- TYPE WORK: LANDSCAPING

ATLANtA TMA TIP # AT AR BP270

LENGTH (miles 1 km)

DESCRPT: METROPOLITAN PARK WAY STREETS CAPE

FUND: STP
o10,00

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$101,000
$625,000 $500,000

OTH Share:

PROJECT: 771270- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

ATLANTA TMA TIP# FN 165

LENGTH (mileslkm) 0.2 10.32

ROW: LOCL

DESCRPT: CR 85/KIMBALL BRIDGE RD. @ BIG CREEK 2 MI SE OF ALPHARETTA

CST: 2002

FED Share:

GA Share:

$125,000
UNDERWAY
$433,000 $346,400 $86,600

PROJECT: 771271- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # FS 139

LENGTH (miles 1 km) 0.2/0.32

ROW: LOCL

DESCRPT: CR 1390/RICO ROAD @MOSS CREEK 6 MI NW OF PALMETTO

CST: 2003

FED Share:

GA Share:

UNDERWAY
$134,000 $107,200
$26,800

PROJECT: 771272- TYPE WORK: , REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

ATLANTA TMA TIP # FS 141

LENGTH (miles 1 km) 0.21/0.34

ROW: LOCL

DESCRPT: CR 485IENON ROAD @ CAMP CREEK 12 MI W OF ATLANTA

CST: 2002

FED Share:

GA Share:

UNDERWAY
$387,000 $309,600
$77,400

PROJECT: 771273- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

ATLANTA TMA TIP # FS 144

LENGTH (miles 1 km) 0.2/0.32

ROW: LOCL

DESCRPT: CR 629/JOHNSON ROAD @PEEKS CREEK I MI E OF PALMETTO

CST: 2002

FED Share:

GA Share:

UNDERWAY
$177,000 $141,600
$35,400

PROJECT: 771274- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

ATLANTA TMA TIP # FN 168

LENGTH (miles 1 km) 0.21/0.34

ROW: LOCL

DESCRPT: CR 27/PROVIDENCE ROAD @ COOPER SANDY CREEK 5 MI NW OFALPHAR

CST: 2002

FED Share:

GA Share:

UNDERWAY
$598,000 $478,400 $119,600

Page J 76 of336

-----,-------_._-------- ,----
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00

FULTON COUNTY

PROJECT: 771Q75- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

ATLANTA TMA TIP # FS 140

LENGTH (miles / km) 0.19/0.31

DESCRPT: CR I 392/COCHRAN MILL ROAD@PEACREEK 7 MI NW OF PALMETTO

PE:2000 ROW: LOCL CST: 2002

FED Share:

GA Share:

UNDERWAY
$129,000 $103,200
$25,800

PROJECT: 771276- TYPE WORK: REPLACE BRIDGE

FUND: STP

ATLANTA TMA TIP # FS 143

LENGTH (miles / km) 0.19/0.31

DESCRPT: CR 1392/COCHRAN MILL ROAD@UTILE PEA CREEK NW OF PALMETTO

PE: 2000 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$129,000 $103,200
$25,800

PROJECT: 771282- TYPE WORK: PRELIMINARY ENGINEERING

ATLANTA TMA TIP # AR 270

LENGTH (miles / km)

DESCRPT: REGIONAL TRANSIT FARE STUDY

FUND:CMAQ 0/0.00

PE:2003 ROW: NONE CST: NONE

$25,000

PROJECT: 771291- TYPE WORK: A T M S / I T S " , FUND:NHS

ATLANT A TMA TIP # AR 308B

LENGTH (miles / km) 0/0.00

DESCRPT: ATMS: MAINTENANCE OF METRO ATLANTA ATMS EQUIPMENT - 2001

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$2,000,000 $1,600,000
$400,000

PROJECT: 771301- TYPE WORK: ATMSIITS

FUND:NHS

ATLANT A TMA TIP # AR 31DB

LENGTH (miles / km) 0/0.00

DESCRPT: ATMS: ITS OPERATIONS AND SUPPORT IN THE ATL REGION - 2001

PE:NONE ROW: NONE CST:200! FED Share: GA Share:

r
$6,250,000 $5,000,000 $1,250,000

PROJECT: 771306- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND:NHS

ATLANTATMATIP#AR313B

LENGTH (miles/km) 0/0.00

DESCRPT: HERO OPERATIONS AND SUPPORT IN THE ATLANTA REGlON-2001

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$2,800,000 $2,240,000
$560,000

PROJECT: 771331- TYPE WORK: RIDE SHARING

FUND: CMAQ

ATLANTA TMA TIP # AR 288

LENGTH (miles! km) ,0/0.00

DESCRPT: REGIONAL TRANSPORTATION COORDINATOR:ONSITE EMPLOYER-BASE TOM

PE: 2001 ROW: NONE CST: NONE

$450,000

PROJECT: 771333- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP

ATLANTA TMA TIP # AR 300A

LENGTH (miles / km) 0/0.00

DESCRPT: PARTNERSHIP FOR SMOG FREE GA (PSG) PH 4

PE: 2001 \ ROW: NONE CST: NONE

$3,000,000

Page J 77 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

_ _ _ _ _ _ _ _ _ ""....._. . _ _....._,_,..- . . . -......

.... .h'...

..._ _.._.._"""""........._ _....

_ . . . - ~ ~,~.' _~

-,,--..0;,..__ l

_ ...... _,~""

FULTON COUNTY

PROJECT: 771334- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP

ATLANTA TMA TIP # AR 300B

LENGTH (miles I km) 0 10.00

DESCRPT: PARTNERSHIP FOR SMOG FREE GA (PSG) PH 5

PE: 2002 ROW: NONE CST: NONE

$4,000,000

PROJECT: 771335- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 291A

LENGTH (miles I km) 0/0.00

DESCRPT: STATE EMPLOYEE COMMUTER ASST & TRANSIT INCENTIVE PROM: PH 2

PE: 2001 ROW: NONE CST: NONE

$500,000

PROJECT: 771336- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 291B

LENGTH (miles I km) 0 10.00

DESCRPT: STATE EMPLOYEE COMMUTER ASST & TRANSIT INCENTIVE PROM: PH 3

PE: 2002 ROW: NONE CST: NONE

$500,000

PROJECT: 771337- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 285A

LENGTH (miles I km) 0 10.00

DESCRPT: ALT FUEL VEHICLE INCREMENTAL COST INCENTIVE PROM/ YR I

PE: 2001 ROW: NONE CST: NONE

$500,000

PROJECT: 771338- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 283

LENGTH (mileslkm) 0/0.00

DESCRPT: ALT FUEL TAROETED FLEET VEHICLE TURNOVER PROM & TAXIS;SHUTTL

PE:NONE ROW: NONE CST: 2001 FED Share:

OTHShare:

PROJECT: 771339- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 289

LENGTH (miles I km) 0 10.00

DESCRPT: CLEAN/ALT FUEL TECHNOLOGIES EDUCATION & OUTREACH PROM

PE:2001 ROW: NONE CST: NONE

$500,000 $400,000
$100,000 $60,000

PROJECT: 771340- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATLANTA TMA TIP # AT AR BP281

LENGTH (miles Zkm) 1/1.61

DESCRPT: PRYOR RD STREETSCAPE FM CLAIRE DR TO UNIVERSITY AVE

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 771351- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

PE.NONE

ATLANTA TMA TIP # M AR 250B

LENGTH (miles I km) 0 10.00

ROW: NONE

DESCRPT: MARTA AUTOMATED TRA VELER INFO SYSTEM & OTHER ITS: PH 2

CST: 2001

FED Share:

OTH Share:

$241,000 $193,000
$48,000
$2,000,000 $1,600,000
$400,000

Page 178 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FULTON COUNTY

PROJECT: 771352- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

PE:NONE

ATLANTATMATIP#MAR250C'

LENGTH (miles/km) 0/0.00

ROW: NONE

DESCRPT: MARTA AUTOMATED TRA VELER INFO SYSTEM & OTHER ITS: PH 3

CST: 2002

FED Share:

OTHShare:

PROJECT: 771354- TYPE WORK: RIDE SHARING

FUND: CMAQ

ATLANTA TMA TIP # AR 159C I

LENGTH (miles / km) 0/0.00

DESCRPT: REGIONAL RIDESHARE PROGRAM-COMMUTE CONNECTIONS- PH I

PE: 2001 ROW: NONE C.ST:NONE

$2,000,000 $1,600,000
$400,000 $2,375,000

PROJECT: 771355- TYPE WORK: R.IDE SHARING

FUND: CMAQ

ATLANTA TMA TIP # AR 159C2

LENGTH (miles / km) 0/0.00

DESCRPT: REGIONAL RIDESHARE PROGRAM-COMMUTE CONNECTIONS- PH 2

PE: 2001 ROW: NONE CST: NONE

$2,375,000

PROJECT: 771360- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 272

LENGTH (miles / km) 0/0.00

DESCRPT: EMPLOYER ASSISTANCE TO PROMOTE TRA VEL DEMAND MANAGEMENT

PE: 2001 ROW: NONE CST: NONE

$150,000

PROJECT: 771363- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

ATLANTA TMA TIP # AR 296A

LENGTH (miles / km) 0/0.00

DESCRPT: REGIONAL VANPOOL SUBSIDY PRGM:APPROX 50 COMMUTER VANPOOLS

PE: 2001 ROW: NONE CST: NONE

$270,000

PROJECT: 771367- TYPE WORK: . MISCELLANEOUS IMPROVEMENTS FUND:CMAQ

PE:NONE

ATLANTA TMA TIP # AR 280B

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: ALT FUEL REVOLVING LOAN PRGM TO FUND FLEET;INFRASTRUCTURE;P2

CST: 2001

FED Share:

OTH Share:

PROJECT: 771368- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ

PE:NONE

ATLANTA TMA TIP # AR 280C

LENGTH (miles / km) 0/0.00

ROW: NONE

. D~SCRPT: ALT FUEL REVOLVING LOAN PRGM TO FUJ':lD FLEET;INFRASTRUCTURE;P3

CST: 2002

FED Share:

PROJECT: 77Y321- TYPE WORK: RAIL PROJECTS

FUND: HPP

ATLANTA TMA TIP # AR 268B I

LENGTH (miles / km) 0/0.00

DESCRPT: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON) PHASE 2 SEE 770321 PROPOSED TCM

ASSOCIATED PROJECTS: 770321-

OTH Shure:
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$1,067,000 $854,000
$213,000
$1,067,000 $854,000
$213,000
"
$4,000,000 $3,200,000
$800,000

Page J 79 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FULTON COUNTY
PROJECT: 707306- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 RAIL CONSTRUCTION PROGRAM (SECTION 5309)

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

OTHShare:

PROJECT: 707307- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: FY 2001 FIXED GUIDEWAY MODERNIZATION (SECTION 5309)

CST: 2001

FED Share:

PROJECT: 707308- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 BUS PROCUREMENT (40) - (SECTION 5309)

OTHShare:

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

PROJECT: 7V7045- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$45,575,000 $36,460,000
$9,115,000
$22,500,000 $18,000,000
$4,500,000
$4,000,000 $3,200,000
$800,000
$143,000 $143,000 $37,000

PROJECT: 86UIIO- TYPE WORK: PRELIMINARY ENGINEERING

FUND: HPP

ATLANTA TMA TIP # AR 267

LENGTH (miles / km) 0/0.00 .

DESCRPT: TRANS ALT STUDY FM ATLANTA TO CHATTANOOGA(ATLANTA $)860110 PROPOSED TCM

PE: 2001 ROW: NONE CST: NONE

$1,875,000

PROJECT: 870375- TYPE WORK: PRELIMINARY ENGINEERING

FUND: BRIDGE

ATLANTA TMA TIP # AR 372

LENGTH (miles/km) 0/0.00

DESCRPT: DESIGN OF 40 BRIDGES IN THE 13 COUNTY ATLANTA AREA-PE ONLY

PE:2001 'ROW: NONE
CST: NONE

$9,999,000

PROJECT: T000006 TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: MARTA FY 2003 RAIL NEW START CATEGORY (SECTION 5309)

CST: 2003

FED Share:

OTH Share:

PROJECT: T000007 TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 0 /0.00

ROW: NONE

DESCRPT: MARTAFY 2003 FIXED GUIDEWAY MODERNIZATION (SECTION 5309)

CST: 2003

FED Share:

OTH Share:

$18,750,000 $15,000,000 $3,750,000
$23,750,000 $19,000,000
$4,750,000

Page 180 of336

_------------_._---
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

FULTON COUNTY
PROJECT: T000008 TYPE WORK: . CAPITAL LENGTH (miles / km)
DESCRPT: MARTA FY 2003 BUS ALLOCATIONS (SECTION 5309)
PROJECT: T000009 TYPE WORK: CAPITAL LENGTH (mites / km)
DESCRPT: FY 2001 GRTA CNG BUS PURCHASE (SECTION 5309)
PROJECT: TOOOOIO TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 GRTA CNG BUS PURCHASE (SECTION 5309)
PROJECT: TOOOOII TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 GRTA CNG BUS PURCHASE (SECTION 5309)
PROJECT: TOOOOl6 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 FULTON COUNTY SECTION 5310

FUND: TRANSIT.

PE: NON E

0/0.00

ROW: NONE

, CST: 2003

FED Share:

$4,000,000 $3,200,000

OTHShare:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001
rso sno

$800,000
$18,000,000 $16,200,000

OTH Share:

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002

FED Shure:

$1,800,000
$18,000,000 $16,200,000

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

$1,800,000
$24,000,000 $21,600,000

OTH Share:

FUND:TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

.FED Share:

GA Share:

$2,400,000
$150,000 $150,000 $37,000

PROJECT: T000026 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 FULTON COUNTY SECTION 5310

FUND: TRANSIT

PE: NON E

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Shure:

$157,000 . $157,000
$39,000

PROJECT: T000030 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 MARTA CAPITAL SECTION 5307
PROJECT: T00003 I TYPE WORK: CAPITAL LENGTH (miles I km}
DESCRPT: FY 2002 MARTA CAPITAL SECTION 5307

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

OTH Shllre:

FUND: TRANSIT

PE:. NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

OTH Share:

$44,549,000 $35,639,000 $8,910,000
$48,339,000 $38,671,000 $9,668,000

Page 181 of336

- - - - - - - - - - - - _ _... __ _ .
STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

_ _ _...,._.~._..,_ _.._ ............,.__" ' _ j _.."'t_"',.......__,

.~_.... . . . - . - - _ .

..

vV':

" ..

# _ - . .........."'....."",nIt:........._ _

FULTON COUNTY
PROJECT: T000032 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 MARTA CAPITAL SECTION 5307

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FEDSllare:

$53,580,000 $42,864,000

PROJECT: T00022I TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 ATLANTA SECTION 3037

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

$10,716,000
$2,000,000 $1,000,000

PROJECT: T000222 TYPE WORK: CAPlT AL LENGTH (miles / km)
DESCRPT: FY 2002 ATLANTA SECTION 3037

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

$1,000,000
$2,000,000 $1,000,000

PROJECT: T000223 TYPE WORK: CAPITAL DESCRPT: FY 2003 ATLANTA SECTION 3037

LENGTH (miles / km)

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

. FED Share:

$1,000,000
$2,000,000 $1,000,000

OTH Share:

PROJECT: T000224 TYPE WORK: CAPITAL

FUND: TRANSIT . PE:NONE

LENGTH (miles / km) 0 /0.00

ROW: NONE

DESCRPT: MARTA FY 2002 RAIL NEW START CATEGORY (SECTION 5309) .

CST: 2002

FED Share:

$1,000,000
$33,250,000 $26,600.000

01'11 Share:

PROJECT: T000225 TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

ATLANTA TMA TIP #

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: MARTA FY 2002 FIXED GUIDEWAY MODERNIZATION (SECTION 5309)

CST: 2002

FED Share:

$6,650,000
$23,125,000 $18,500,000

OTiJ Share:

$4,625,000

Page J81 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

GiLMER COUNTY

PROJECT: 0000847 TYPE WORK: REPLACE BRIDGE

FUND: FOREST HWY PE: 2001

LENGTH (miles / km) 0.21 /0.34

ROW: NONE

DESCRPT: CR I 53/FH 34IROCK CREEK ROAD @ ROCK CREEK 9 MI NE OF ELLIJAY

CST: 2002 FED Share:

.$25,000
$238,000 $238,000

PROJECT: 62214X- TYPE WORK: TURN LANES

FUND:NHS

LENGTH (miles / km) 22. I /35.52

DESCRPT: SR515 FM 1-575 THRU GILMER TO TOTEHEROW RD/FANNINISEE PICKEN

ASSOCIATED PROJECTS: 622140-

PE:NONE ROW: NONE CST: NONE

PROJECT: 631580- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.3 /0.48

PE: 1998 ROW: 2001

DESCRPT: SR 282 BRIDGE REPLACEMENT OVER TAILS CREEK WEST OF ELLlJA Y

CST: 2002 FED Share:

GA Share:

UNDERWAY $36,000
$1,506,000 $1,204,800
$301,200

PROJECT: 631590- TYPE WORK: PASSING LANES

FUND: STP

,

LENGTH (miles / km) 3.3 /5.31

DESCRPT: SR 2/52 PASSING LNS EB MP 4.8-5.9IMP 8.25-9.35IWB 10.4-115

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 2003 ROW: CST:

$306,000 AFTER 2003 AFTER 2003

PROJECT: 642070- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 5.35 /8.61

DESCRPT: SR 382- FOUR LOCATIONS BETWEEN SR 136 AND OLD SR 5

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 2003 ROW: CST:

$461,000 AFTER 2003 AFTER 2003

Page 183 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

GLASCOCK COUNTY
PROJECT: 245345- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 102 @ JOES CREEK 2.2 MI SE OF MITCHELL

FUND: BRIDGE

PE: 200 I

0.21/0.34

ROW: 2002

CST: 2003

FED Share:

GA Share:

$20,000 $10,000 $605,000 $484,000 $121,000

PROJECT: 245347- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.22/0.35

DESCRPT: SR 171 @ ROCKY COMFORT CREEK OfF 1.8 MJ NE OF GIBSON

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page 184 0/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

~-'-'-----'----

9/21/00

GLYNN COUNTY

PROJECT: 0000075 TYPE WORK: LANDSCAPING

~RUNSWICKTIP#BATSOI-05

LENGTH (mileslkm)

DESCRPT: SPUR 25 CORRIDOR BEAUTIFICATION & PED/BIKE ROUTE

FUND: STP 010.00

PE:LOCL ROW:LOCL CST: 2001 FED Share:

PROJECT: 0000421 TYPE WORK: WIDENING

FUND: STP

BRUNSWICK TIP # BATSO1-02

LENGTH (miles I km) 2.4 13.86

DESCRPT: SR 25 SPUR FM CATE RD ALONG CANAL RD/CR 588 TO SR 99

EXIST. LANES: 02 PROPOSED LANES: 04

OTHShare:
PE:2003 ROW: LOCL CST:

!!
$500,000 $400,000
$100,000 $5,000
AFTER 2003

PROJECT: 0000422 TYPE WORK: WIDENING

BRUNSWICK TIP # BATSOO-15

LENGTH (miles I km)

DESCRPT: SR 99/GRANTS FERRY ROAD FROM SR 25/US 17 TO 1-95

EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 1.26/2.03

PE: 2001 ROW: LOCL . CST:

$5,000 AFTER 2003

PROJECT: 0001136 TYPE WORK: SIGNALS

FUND: STP

BRUNSWICK TIP #

LENGTH (miles I km) 0 10.00

DESCRPT: UPGRADE SIGNAL EQUIPMENT @ SEVERAL LOC IN GLYNN CO

LUMP SUM PROJECT

PE.NONE ROW: NONE CST: 2001 FED Share: GA Share:

$425,000 $340,000
$85,000

PROJECT: 51108X- TYPE WORK: WIDENING

FUND: NHS

BRUNSWICK TIP # BATS93-11

. LENGTH (miles I km) 0 10.00

DESCRPT: 1-95 FM CR 138 TO US 17/GLYNN & BR @ L SATlLLA RIVER--511 084

EXIST. LANES: 04 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 511084-

PE:NONE ROW: NONE CST: NONE

PROJECT: 511100- TYPE WORK: WIDENING

FUND: NHS

BRUNSWICK TIP # BATS93-10

LENGTH (mileslkm) 7.77/12.51

DESCRPT: 1-95 FM US 341 TO ALTAMAHA RIVER @ MCINTOSH COUNTY LINE

EXIST. LANES: 04 PROPOSED LANES: 06

PE: 1993 ROW: 2001 CST:

UNDERWAY $8,000
AFTER 2003

PROJECT: 511325- TYPE WORK: ATMS/ITS

FUND: 1M

BRUNSWICK TIP# BATSOI-OI

LENGTH (miles I km) 7/11.27

DESCRPT: ATMS/I-95 FOG DETECTION SYS FM SR 520/US 82 TO SR 27/US 341

PE: 1997 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$1,500,000 $1,350,000
$150,000

PROJECT: 511420- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles I km)
DESCRPT: 1-95 AT SR 520/US 17/0CEAN HIGHWAY LUMP SUM PROJECT

FUND:STP 0.63/1.01

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
~
$309,000 $278,100
$30,900

Page 1850/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

GLYNN COUNTY

PROJECT: 522042- TYPE WORK: BRIDGE REMOV AL

FUND: OTHER

BRUNSWICK TIP#BATS96-05

LENGTH (miles/km) 0/0.00

DESCRPT: SR 25IBRUNSWICK REMOVAL OF OLD SIDNEY LANIER BRIDGE

PE: 1991 ROW: NONE CST: 2001

FED Share:

GA Share:

UNDERWAY
$7,924,000 $3,962,000 $3,962,000

PROJECT: 522730- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

BRUNSWICK TIP # BATS94-08

LENGTH (miles 1 km) 0.27/0.43

DESCRPT: SR 25 @ CS 427ffALMADGE AVE & SR 25CIGLOUCESTER ST/BRUNSWICK

EXIST. LANES: 04 PROPOSED LANES: 05

PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$450,000 $405,000
$45,000

PROJECT: 532650- TYPE WORK: WIDENING

FUND: STP

BRUNSWICK TIP # BATSOI-03

LENGTH (miles 1 km) 3.7516.04

DESCRPT: SR 25/US 17 FROM YACHT DRIVE TO ALTAMAHA BLVD-WIDENING

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 532655-

PE: 2002 ROW: CST:

$50,000 AFTER 2003 AFTER 2003

PROJECT: 533140- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

BRUNSWICK TIP # 00-02

LENGTH (miles 1 km) 0.2510.40

DESCRPT: SR 520/JEKYLL ISLAND ROAD @ CEDAR CREEK 1.5 MI SE OF SR 25

PE: 2000 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 542240- TYPE WORK: WIDENING

FUND: STP

BRUNSWICK TIP # BATSOI-04

LENGTH (miles 1 km) 1.512.42

DESCRPT: OLD JESUP HWY/CR 586 FM SR303/COMMUNITY RD TO CATE RD/CR 589

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 2002 ROW: LOCL CST:

$100,000 AFTER 2003

PROJECT: 562120- TYPE WORK: BRIDGES

FUND: STATE

BRUNSWICK TIP # BATS96-06

LENGTH (miles 1 km) 1.45/2.33

DESCRPT: SR 520 OVER LATHAM RIVER AT ONE LOCATION ON JEKYLL CAUSEWAY

PE: 2001 ROW: 2001 CST:

. $250,000 $182,000
AFTER 2003

PROJECT: 5D8007- TYPE WORK: OPERATING

FUND: TRANSIT

PE:NONE

BRUNSWICK TIP #

LENGTH (miles 1 km) 010.00

ROW: NONE

DESCRPT: PUBLIC TRANSIT SERVICE FOR BRUNSWICK AND GLYNN COUNTY

CST: 2001

FED Share:

OTH Share:

PROJECT: 5D8008- TYPE WORK: CAPITAL

FUND: TRANSIT

PE.NONE

BRUNSWICK TIP #

LENGTH (miles 1 km) 010.00

ROW: NONE

DESCRPT: TRANSIT VEHICLES- OFFICE EQUIPMENT- CAP. MAINT- ETC.

CST: 2001

FED Share:

GA Share:

OTH Share:

$420,000 $210,000
$210,000
$203,000 $180,000
$23,000 $23,000

Page 186 of336

r--------::==::==========================:::::::.::::===========::::..:=========-=.,=-----------~------
STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _-_._'.., _ - - , .. .. ...... ....... -."'~"'"-',._"'--,------_._---, ~

9/21/00

.....

..

_ _..

-l" _ _ ~""""O:

I. _ _

GLYNN COUNTY

PROJECT: 508009- TYPE WORK: OPERATING

BRUNSWICK TIP #

LENGTH (miles / km)

FUND: TRANSIT 0/0.00

PE:NONE ROW: NONE

DESCRPT: PUBLIC TRANSIT SERVICE FOR BRUNSWICK ANO GLYNN COUNTY

CST: 2002

FED Share:

$450,000 $225,000

OTB Share:

PROJECT: 508010- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

BRUNSWICK TIP #

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: TRANSIT VEHICLES- OFFICE EQUIPMENT. CAP. MAINT- ETC.

CST: 2002

FED Share:

GA Share:

OTH Share:

PROJECT: 50801 I- TYPE WORK: OPERATING

FUND: TRANSIT

. PE:NONE

BRUNSWICK TIP #

LENGTH (miles / km) 0/0.00

. ROW: NONE

DESCRPT: PUBLIC TRANSIT SERVICE FOR BRUNSWICK ANO GL YNN COUNTY

CST: 2003

FED Share:

$225,000
$221,000 $196,000
$25,000 $25,000
$480,000 $240,000

OTH Share:

PROJECT: 508012- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

BRUNSWICK TIP #

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: FACILITY LEASING- OFFICE EQUIPMENT- CAP. MAINT.- ETC

CST: 2003

FED Share:

GA Share:

OTH Shure:

PROJECT: ONR255- TYPE WORK: B1CYCLE/PEO. FACILITY

FUND: REC TRAILS PE: NONE

BRUNSWICK TIP # BATSOI-06

LENGTH (miles/km) 0/0.00

ROW: NONE

DESCRPT: ONR REC TRAILS PROG - ALTAMAH A PARK RECREATIONAL TRAIL

CST: 200 I

FED Shure:

$240,000
$221,000 $196,000
$25,000 $25,000
$125,000 $100,000

PROJECT: TOOOl57 TYPE WORK: CAPITAL

BRUNSWICK TIP #

LENGTH.(mites / km)

DESCRPT: FY 2001 BRUNSWICK SECTION 5310

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share: '

$25,000
.$18,000 $18,000
$5,000

PROJECT: TOOOl58 TYPE WORK: CAPITAL

BRUNSWICK TIP #

LENGTH (miles / km)

DESCRPT: FY 2002 BRUNSWICK SECTION'5310

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$19,000 $19,000
$5,000

PROJECT: TOOOI98 TYPE WORK: CAPITAL

BRUNSWICK TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 BRUNSWICK SECTION 53 10

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$20,000 $20,000 $5,000

Page 187 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

GORDON COUNTY
PROJECT: 0000308 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR 156 @ COLLEGE STREET IN CALHOUN

FUND: STP 0.25 /0.40

PE: 2000 ROW: LOCL CST: 2003 FED Share: GA Share:

UNDERWAY
$361,000 $288,800 $72,200

PROJECT: 0000683 TYPE WORK:' REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.2/0.32

DESCRPT: CR I 34/COUNTY LINE ROAD @ POLECAT CREEK AT MURRA Y CO LINE

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 610750- TYPE WORK: INTERCHANGE LENGTH (miles/km)
DESCRPT: 1-75 @ SR 1561N CALHOUN EXIST. LANES: 03 PROPOSED LANES: 05

FUND: 1M 0.5/0.81

PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $9,476,000 $5,631,000 . $5,067,900
$563,100

PROJECT: 610930- TYPE WORK: INTERCHANGE

FUND: STP

LENGTH (miles / km)

1 /1.61

DESCRPT: 1-75 INTERCHANGE'@ SR 136 & WIDENING ON SR 136/61 Y930

ASSOCIATED PROJECTS: 61Y930-

PE: 1995 ROW: 2002 CST:

UNDERWAY $753,000
AFTER 2003

PROJECT: 620780- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 1.65 12.66

DESCRPT: SR 3/US 41 FM S OF SR 156 N TO CALHOUN BYP IN CALHOUN

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 621365-

PE: 1992 ROW: 2001 CST:

UNDERWAY $5,513,000 AFTER 2003

PROJECT: 621360- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 0.7/1.13

DESCRPT: SR 3IUS 41 FM LINE ST. TO N OF SR I56IREDBUD RD IN CALHOUN

EXIST. LANES: 02 PROPOSED LANES: 04

PE:NONE ROW: 2001 CST: 2001
GA Share:

$3,500,000 $1,309,000
$1,309,000

PROJECT: 621365- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 1.612.58

DESCRPT: SR 3/US 41/CALHOUN FM CR 651UNION GROVE RD TO SR 53/INCL BR

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 610870-

PE: 1992 ROW: 2003 CST:

UNDERWAY $1,000,000 AFTER 2003

PROJECT: 621620- TYPE WORK: TURN LANES

FUND: STP

LENGTH (miles / km) 0.84/1.35

DESCRPT: SR 53/CALHOUN FM W C BRYANT PKWY/CS 814 EAST TO SR 3/US 41

PE: 1993 ROW: 2002 CST:

UNDERWAY $265,000
AFTER 2003

Page J88 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00

GORDON COUNTY
PROJECT: .632905- TYPE WORK: REPLACE ~RIDGE LENGTH (miles I km)
DESCRPT: SR 53@SALACOACREEK I MI WEST OF FAIRMOUNT

FUND: BRIDGE 0.24/0.39

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 642390- TYPE WORK: REPLACE BRIDGE LE!VGTH (miles I km)
DESCRPT: SR 156 @ SALACOA CREEK 6 MI NW OF RANGER

FUND: BRIDGE

PE: 1999

0.27 /0.43

ROW: 2002

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$1,153,000 $922,400 $230,600

PROJECT: 642391- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.26 10.42

DESCRPT: SR 156 @ OOTHKALOOGA CREEK I MI WEST OF CALHOUN

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 64239X- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0/0.00

DESCRPT: SR 156 @ JOHNS CREEK ON FLOYD-GORDON CO LNISEE FLOYD 642395

ASSOCIATED PROJECTS: 642395-

PE:NONE ROW: NONE CST: NONE

PROJECT: 67111X- TYPE WORK: SIGNING

FUND: FOREST HWY P. NONE

LENGTH (miles I km) 0/0.00

ROW: NONE

DESCRPT: CALHOUN GAP RD/CR 21OICR 194 FM CR 641 TO CR 482; SEE FLOYD

CST: NONE

ASSOCIATED PROJECTS: 671110-

PROJECT: 671165- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1998

LENGTH (miles I km) 0.25 /0.40

ROW: LOCL

DESCRPT: CR 233/KNIGHT BOTTOM ROAD @ SALACOA CREEK 4.4 M~ W OF RANGER

CST: 2002

FED Share:

GA Share:

UNDERWAY
$630,000 $504,000 $126,000

PROJECT: M000484 TYPE WORK: BRIDGE PAINTING

FUND: 1M .

LENGTH (miles / km) . 0/0.00 DESCRPT: BRIDGE PAINTING@SEVERALLOC IN GO~DON & WHITFIELD COUNTIES

LUMP SUM PROJECT

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$518,000 ,$414,400 $103,600

.,

Page 189 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
,----------------_.----" _.,9-/2-1-/0-0 ----.;..,-------_._-------,--

GRADY COUNTY
PROJECT: 0000451 TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: CR 324/PINE PARK ROAD @ LITTLE TIRED CREEK

FUND: BRIDGE

PE: 200 I

0.25/0.40

ROW: LOCL

CST: 2003

FED Share:

GA Share:

$20,000
$662,000 $529,600 $132,400

PROJECT: 431550- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
, DESCRPT: SR III @TlREDCREEK&OVERFLOW SOUTH OF CAIRO

FUND: BRIDGE

PE: 1995

0,21 /034

ROW: 2000

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY
$2,565,000 $2,052,000
$513,000

PROJECT: 431800- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles / km) 0,22/035

ROW: 2001

DESCRPT: SR 112/PELHAM ROAD @ SAPP CREEK APP 5 MI N OF CAIRO

CST: 2003

FED Share:

GA Share:

UNDERWAY $2,000
$809,000 $647,200 $161,800

PROJECT: 432120- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.21 /034

DESCRPT: SR 93- SR II I @ GIN BRANCH APP 2 MI N OF CAIRO

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 471432- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: MULTI-USE TRAILS IN THE CITY OF CAIRO

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Shure:

OTHShare:

$334,000 $267,000
$67,000

Page 190 of336

._--_._-------
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00

GREENE COUNTY

PROJECT: 0000151 TYPE WORK: LANDSCAPING

FUND:STP

PE: LOCL

LENGTH (miles / km) 0/0.00

ROW: LOCL

DESCRPT: LAKE OCONEE PARKWAY GATEWAY ENHANCE & STORM WATER MANAGEME CST: 2001

FED Share:

PROJECT: 00004X2 TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles / km) 0 /0.00

DESCRPT: 1-20 SAFETY UPGRADES @ 2 LOC MORGAN CO &SR 44/GREENE/0000472

OTHShare:
PE:NONE ROW: NONE CST: NONE

ASSOCIATED PROJECTS: 6000472

$125,000 $100,000
$25,000

PROJECT: 23 I 760- TYPE WORK: REPLACE BRIDGE

FUND: ~RIDGE

PE: 1996

.LENGTH (miles / km) 0.5/0.81

ROW: 2000

DESCRPT: SR 44/JASPER COPELAND BRIDGE OVER RICHLAND CREEK & TURN LNS

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY $1,315,000 $1,052,000
$263,000

PROJECT: 232290- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.23/0.37

DESCRPT: SR 44 @ NORTH FORK LITTLE RIVER 7.8 MI NE OF UNION POINT

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 245100- . TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles / km) 0.43/0.69

ROW: 2001

DESCRPT: SR 15 OVER HARRIS BRANCH 9.7 MILES NW OF GREENSBORO

CST: 2001

FED Share:

GA Share:

UNDERWAY $50,000
$944,000 $755,200 $188,800

PROJECT: 245 I 10- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles / km) 0.5/0.8 I

ROW: 2001

DESCRPT: SR, 15 OVER FISHING CREEK 7.9 MILES NW OF GREENSBORO

CST: 2001

FED Share:

GA Share:

UNDERWAY $50,000
$950,000 $760,000 $190,000

PROJECT: 245 I20- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 15 OVER TOWN CREEK 5.2 MILES N OF GREENSBORO

FUND: BRIDGE

PE: 1997

0.5/0.81

ROW: 2001

CST: 2001

FED Share:

GA Share:

UNDERWAY $50,000
$1,099,000 $879,200 $219,800

PROJECT: 262740- TYPE WORK: RECSTIREHAB

FUND: STP

LENGTH (miles / km) 4.2 /6.76

DESCRPT: LINGER LONGER RDICR 54/55 FM SR 44 TO END(PARTNEW CONST&BR)

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$3,120,000 $2,496,000
$624,000

Page 1910/336

-,--------------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

GREENE COUNTY



PROJECT: 271292- TYPE WORK: LANDSCAPING

FUND: STP

PE: LOCL

LENGTH (miles I km) 0 10.00

ROW: LOCL

DESCRPT: STREETSCAPES & SIDEWALKS IN THE CITY OF GREENSBORO

CST: 2001

$300,000

FED Share:

$240,000

OTHShare:

$60,000

.
Page /91 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00 -

GWINNETT COUNTY

PROJECT: 0000107 TYPE WORK: HISTORIC PRESERVATION

ATLANTA TMA TIP # GW AR BP091 _

LENGTH (miles / km)

DESCRPT: SOUTHEAST RAIL WAY MUSEUM IMPROVEMENTS

FUND:STP 0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000163 TYPE WORK: SIDEWALKS

FUND: STP

ATLANTA TMA TIP # GW AR BP094

LENGTH (miles / km) 0/0.00

DESCRPT: SUGAR HILL WEST PRICE ROAD SIDEWALK AND LANDSCAPING

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000164 TYPE WORK: LANDSCAPING

ATLANTA TMA TIP # GW AR BP095

LENGTH (miles r km)

DESCRPT: BUFORQ STREETSCAPE

FUND: STP 0/0.00

OTH Share:
PE:LOCL ROW: LOCL -CST:200( FED Share:

OTH Share:

PROJECT: 0000165 TYPE WORK: SIDEWALKS

FUND: STP

PE: LOCL

ATLANTA TMA TIP # GW AR BP096

LENGTH (miles/km) 0/0.00

ROW: LOCL

DESCRPT: LAWRENCEVILLE SIDEWALKS ALONG HWY 20/GWINNETT DR TO SIMONTON

CST: 200 J

FED Share:

PROJECT: 0000575 TYPE WORK: TRANSIT FACILITIES

ATLANTA TMA TIP # GW AR 235

LENGTH (miles / km)

DESCRPT: LILBURN COMMUTER RAIL STATION

OTH Share:

FUND:CMAQ

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

PROJECT: 0000576 TYPE WORK: TRANSIT FACILITIES

ATLANTA TMA TIP # GW AR236

LENGTH (m/Jes/ km)

DESCRPT: RONALD REGAN PKWY COMMUTER RAIL STATION

OTH Share:

FUND:CMAQ

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

PROJECT: 0000577 TYPE WORK: TRANSIT FACILITIES

ATLANTA TMA TIP # GW AR 237

LENGTH (miles/km)

DESCRPT: DACULA COMMUTER RAIL STATION

OTH Share:

FUND:CMAQ

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

PROJECT: 0000578 TYPE WORK: TRANSIT FACILITIES

ATLANTA TMA TIP # GW AR 238

LENGTH (miles / km)

DESCRPT: LAWRENCEVILLE COMMUTER RAIL STATION

OTHShare:

FUND:CMAQ

PE.NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

OTH Share:

$972,000 $778,000 $194,000
$282,000 $226,000 $56,000
$1,350,000 $1,080,000
$270,000
$102,000 $82,000 $20,000
$1,500,000 $1,200,000
$300,000
$1,500,000 $1,200,000
$300,000
$1,888,000 $1,510,000
$378,000
$1,500,000 $1,200,000
$300,000

Page 193 of336

------_._---_.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

GWINNETT COUNTY

PROJECT: 110233- TYPE WORK: INTERCHANGE

FUND: 1M

ATLANTA TMA TIP # GW AR 072E

LENGTH (miles I km) 1.7 12.74

DESCRPT: 1-85 FM N OF SUGARLOAF TO N OF OLD PEACHTREE & CD SYSTEM

EXIST. LANES: 08 PROPOSED LANES: 12

PE.NONE ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY $19,638,000 $17,674,200
$1,963,800

PROJECT: 110435- TYPE WORK: REST AREA

ATLANTA TMA TIP # GW AR 186B

LENGTH (miles I km)

DESCRPT: 1-85 DEMOLISH REST AREAS # 75 & # 76

FUND: 1M 010.00

PE: 1995 ROW: NONE CST: 2003 FED Share: GA Share:

UNDERWAY
$350,000 $315,000
$35,000

PROJECT: 110530- TYPE WORK: INTERCHANGE

ATLANTA TMA TIP # GW AR 053A

LENGTH (miles I km)

DESCRPT: 1-85/SR 403 AT SR 316 INTERCHANGE

FUND: 1M 2/3.22

PE: 1997 ROW: 2001 CST:

UNDERWAY $13,623,000 AFTER 2003

PROJECT: 110600- TYPE WORK: WIDENING

ATLANTA TMA TIP # GW AR 191

LENGTH (miles I km)

DESCRPT: 1-85 FM 1-985 TO N/CR 134/HAMILTON MILL RD

EXIST. LANES: 04 PROPOSED LANES: 06

FUND:NHS 7 I 11.27

PE: 2001 ROW: 2002 CST: 2002 FED Share: GA Share:

$2,799,000 $402,000
$27,206,000 $21,764,800
$5,441,200

PROJECT: 110610- TYPE WORK: WIDENING

FUND:NHS

ATLANTA TMA TIP # GW AR 192

LENGTH (mileslkm) 6.3 110.14

DESCRPT: 1-85 FM HAMILTON RD TO N/SR 211/FARl'v1 MARKET RD IN BARROW

EXIST. LANES: 04 PROPOSED LANES: 06

PE: 2001 ROW: 2002 CST: 2003 FED Share: GA Share:

$2,500,000 $402,000
$24,323,000 . $19,458,400
$4,864,600

PROJECT: 110720- TYPE WORK: ATMSIITS

FUND:CMAQ

ATLANTA TMA TIP # GW AR 193

LENGTH (mileslkm) 9.22 114.84

DESCRPT: ATMS/ 1-85 N COMMUNIC/SURVEILANCE FROM SR 316 TO SR 20

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$5,000 $4,000 $1,000

PROJECT: 110800- TYPE WORK: PARK & RIDE LOT

FUND: NHS

ATLANTA TMA TIP # GW 284

LENGTH (mileslkm) 010.00

DESCRPT: 1-85 @INDIAN TRAIL RD MODIFICATIONS TO PARK AND RIDE LOT

PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$500,000 $400,000 $100,000

PROJECT: 121682- TYPE WORK: WIDENING

FUND: STP

ATLANTA TMA TIP # GW 088

LENGTH (mileslkm) 2.94/4.73

DESCRPT: SR 120 FM 1-85 WEST OF ATKINSON RDTO W OF RIVERSIDE PKWY

EXIST. ~ANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: NONE CST: 2003 FED Share: GA Share:

UNDERWAY
$6,014,000 $4,811,200 $1,202,800

Page 194 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

GWINNEtT COUNTY

PROJECT: 121720- TYPE WORK: WIDENI~G

FUND:NHS

ATLANTA TMA TIP # GW 076B

LENGTH (miles 1 km) 3.9/6.28

DESCRPT: SR 124 FM CENTERVILLE-ROSEBUD RD TO HENRY CLOWER BLVD

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 1996 CST: 2003 FED Share: GA Share:

UNDERWAY UNDERWAY $12,495,000 $9,996,000 $2,499,000

PROJECT: 132890- TYPE WORK: BRIDGES

FUND: STP

ATLANTA TMA TIP # GW 279A

LENGTH (miles 1 km) 0.6/0.97

DESCRPT: CR I 880IPLEASANT HILL RD@BUFORD HWY & NS RR/GRD SEP PHI

ASSOCIATED PROJECTS: I3Y890-

PE: 1999 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $ J8,425,000
$9,567,000 $7,653,600 $1,913,400

. PROJECT: 132985- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # GW 288

LENGTH (miles 1 km) 0.3510.56

ROW: 2001

DESCRPT: SR 20/CUMMING HWY @ CHA TTAHOOCHEE RIVER @ FORSYTH CO LINE

CST: 2002

FED Share:

ASSOCIATED PROJECTS: 13298X-

GA Share:

UNDERWAY $10,000
$4,402,000 $3,521,600
$880,400

PROJECT: 132986-' TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

ATLANTA TMA TIP# GW 290

LENGTH (mileslkm) 0.2110.34

DESCRPT: SR 120/DULUTH HIGHWAY @ SINGLETON CREEK 1.5 MI E OF DULUTH

PE: 1999 ROW: 2001 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 133091- TYPE WORK: ATMSIITS

FUND: STP

ATLANTA TMA TIP # GW 282

LENGTH (mileslkm) 8.4/13.52

DESCRPT: ATMS: PEACHTREE INDUST BLVD FM HOLCOMB BR TO ROGERS BR RDS

PE: 2000 ROW: LOCL CST: 2001 FED Share:

OTl/.Share:

PROJECT: I3Y890- TYPE WORK: BRIDGES

FUND: STP

ATLANTA TMA TIP # GW 279B I

LENGTH (miles 1 km) 0.2 10.32

DESCRPT: PLEASANT HILL RD @ BUFORD HWY & NS RR/GRADE SEPARATE 132890

ASSOCIATED PROJECTS: 132890-

PE: 1999 ROW: NONE CST: 2002 , FED Share: GA Share:

$102,000
$914,000 $731,000
$183,000 UNDERWAY
$10,000,000 '$8,000,000 $2,000,000

PROJECT: 142285- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # GW 289

. LENGTH (miles 1 km); 0.25 10.40

ROW: 2001

DESCRPT: SR 324/GRAVEL SPRING RD @ 1-85 4.5 MI SE OF BUFORD

CST: 2001

FED Share:

GA Share:

UNDERWAY $10,000
$1,345,000 $1,076,000
$269,000

PROJECT: 150320- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

ATLANTA TMA TIP# GW274

LENGTH (mileslkm) 0.2210.35

DESCRPT: CR 417/KILLIAN HILL ROAD@YELLOW RIVER 4 MI SE OF LILBURN

EXIST. LANES: 02 PROPOSED LANES: 04

.

ASSOCIATED PROJECTS: 150270-

PE: 2001 ROW: LOCL CST:

$32,000 AFTER 2003

Page 1950/336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
..- 9/21/00
------------"'----~-""""""""""~-- ....._,.,."-----~.,,.,..-_..-.."'''''~'''- ...........'''''

GW1NNETT COUNTY

PROJECT: 162520- TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

ATLANTA TMA TIP # GWARBPOII

LENGTH (miles I km) 2.2/3.54

DESCRPT: WP JONES TRAIL! PLEASANT HILL RD FM RIVER TO BUFORD HWY

PE: 1995 ROW: LOCL CST: 2001

FED Share:

PROJECT: 162522- TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # GW AR BPO19

LENGTH (miles I km)

DESCRPT: BUFORD HWY FM HERAEUS BLVD TO NEAR SR 20

OTH Share:

FUND: CMAQ

PE: 1995

0/0.00

ROW: LOCL

CST: 2001

FED Share:

PROJECT: 162526- TYPE WORK: SIDEWALKS

ATLANTA TMA TIP # GW AR BP04 J

LENGTH (miles I km)

DESCRPT: MILLER RD FM COLE DR TO HAMBRICK DR

OTH Share:

FUND: CMAQ

PE: 1995

0/0.00

ROW: LOCL

CST: 2001

FED Share:

OTHShare:

PROJECT: 171350- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

ATLANTA TMA TIP # GW 216

LENGTH (mileslkm) 0.2/0.32

ROW: LOCL

DESCRPT: CR I959/CENTERVILLE-ROSEBUD RD @ BIG HAYNES CREEK

CST: 2001

FED Share:

GA Share:

UNDERWAY
$500,000 $400,000
$100,000 UNDERWAY
$200,000 $160,000
$40,000 UNDERWAY
$440,000 $352,000
$88,000 UNDERWAY
$384,000 $307,200
$76,800

PROJECT: 171545- TYPE WORK: BRIDGE PAINTING

FUND: STP

ATLANTA TMA TIP # AR 131D

LENGTH (miles I km)

0 10.00

DESCRPT: BRIDGE PAINTING IN GWINNETT AND HALL COUNTIES/17154X

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 17154X-

PE:NONE ROW: NONE
CST: 2001 FED Share:
GA Share:

$628,000 $502,400 $125,600

PROJECT: 171630- TYPE WORK: PARK & RIDE LOT

FUND: STP

ATLANTA TMA TIP # GW AR 228

LENGTH (miles I km) 0 10.00

DESCRPT: SNELLVILLE AREA PARK & RIDEITRANSFER CTR:NEAR US 78 @SR 124

PE: 2002 ROW: LOCL CST:

$100,000 AFTER 2003

PROJECT: 171632- TYPE WORK: VEHICLE PURCHASES

ATLANTA TMA TIP # GW AR 224

LENGTH (mileslkm)

DESCRPT: BUS ACQUISITION: 8-9 LOCAL CNG BUSES

FUND: CMAQ

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

OTHShare:

PROJECT: 171633- TYPE WORK: VEHICLE PURCHASES

FUND: CMAQ

PE.-NONE

ATLANTA TMA TIP # GW AR 225

LENGTH (miles I km) 0 10.00

ROW: NONE

DESCRPT: ACQUISITION OF 4-5 CNG COMMUTER BUSES & RELATED EQUIP

CST: 2002

FED Shure:

OTII Shure:

$3,444,000 $2,755,000
$689,000
$1,969,000 $1,575,000
$394,000

Page 196 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM

.._.,.__. _ - - - _.. . __...._.. _-_._-----.-- -~,:_~

9/21/00
--""'--~-"""""'""""""""-~--;~----"""~--._

GWINNETT COUNTY

PROJECT: 171636- TYPE WORK: VEHICLE PURCHASES

ATLANTA TMA TIP # GW AR 223

LENGTH (miles / km)

DESCRPT: PARATRANSIT BUS ACQUISITION: 3-4 CNG BUSES

FUND: CMAQ

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

$297,000 $238,000

OTH Shure:

PROJECT: 107155- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

LENGTH (miles / km) 0 /0.00

ROW: NONE

DESCRPT: TRANSIT CAPITAL (SECTION 5307) ASSISTANCE FOR FY 2001

CST: 2001

FED Share:

GA Share:

OTHShare:

PROJECT: 107157- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: TRANSIT CAPITAL ITEMS

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTHShare:

PROJECT: I V7028- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$59,000
$2,115,000 $1,880,000
$235,000 $235,000
$2,254,000 $2,003,000
$251,000 $251,000
$46,000 $46,000 $12,000

PROJECT: 72214X- TYPE WORK: ATMS/ITS

FUND: CMAQ

ATLANTA TMA TIP # AR 306

LENGTH (miles / km) 5.52 /8.89

DESCRPT: ATMS/SRI41 COMM/SURV FM 1-285 TO SPALDING DRjSEE DEK. 722145

ASSOCIATED PROJECTS: 722145-

PE:NONE ROW: NONE CST: NONE

PROJECT: 74286X- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ATLANTA TMA TIP # FN 088

. LENGTH (miles / km) 0/0.00

DESCRPT: SPALDING DR FROM MT VERNON RD TO SR 140 @ INTER 1742860

ASSOCIATED PROJECTS: 742860-

PE:NONE ROW: NONE CST: NONE

PROJECT: TOOOOl7 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 GWINNETT COUNTY SECTION 5310

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$48,000 $48,000 $12,000

PROJECT: T000027 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 GWINNETT COUNTY SECTION 5310

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Shure:

$51,000 $51,000 . $13,000

Page J 97 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~""~.~_,,......_ . _ .

... ~ _ ._ ._ _

, _....~"'",Il

_

. GWINNETT COUNTY
PROJECT: T000033 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 GWINNEIT COUNTY BUS CAPITAL SECTION 5309

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTHShare:

PROJECT: T000034 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 GWINNEIT COUNTY BUS CAPITAL SECTION 5309

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTHShare:

PROJECT: T000036 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 GWINNEIT COUNTY BUS CAPITAL SECTlON 5307

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTHShare:

$5,760,000 $5,120,000
$640,000 $640,000
$5,400,000 $4,800,000
$600,000 $600,000
. $2,401,000 $2,134,000
$267,000 $267,000

Page 198 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00

HABERSHAM COUNTY

PROJECT: 0000138 TYPE WORK: LANDSCAPING

FUND: STP

LENGTH (miles I km) 0 10.00

DESf;RPT: DOWNTOWN CLA.RKESVILLE BUSINESS DISTRICT STREETSCAPE

PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000139 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles I km)
DESCRPT: TALLULAH GORGE MULTI-USE TRAIL PHASE 3

FUND:STP 010.00

OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 122440- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 17 FM 3-LANE @ BEAVERDAM CK TO SR 115 EXIST. LANES: 02 PROPOSED LANES: 04

FUND:STP 1.37/2.21

'J

PROJECT: 122450- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles I km) 2.05 13.30

DESCRPT: SR 105 RELOC FOR PASSING LANES FRM E OF CR 56 TO W OF CR 53

EXIST. LANES: 02 PROPOSED LANES: 03

OTH Share:
PE:1993 ROW: 2001 CST: 2002 FED Share: GA Share:
PE: 1995 ROW: 1997 CST: 2002 FED Share: GA Share:

$313,000 $250,000
$63,000
$563,000 $450,000
$113,000
UNDERWAY $240,000 $918,000 $734,400 $183,600
UNDERWAY UNDERWAY $2,237,000 $1,789,600
$447,400

PROJECT: 122455- TYPE WORK: BRIDGE REHAB LENGTH (miles I km)
DESCRPT: SR 105 OVER SOQUEE CREEK ...GOES WITH PI 122450 EXIST. LANES: 02 PROPOSED LANES: 03 ASSOCIATED PROJECTS: 122450-

FUND: BRIDGE

PE: 1996

0.41/0.66

ROW: NONE

CST: 2002

FED Share:

GA Share:

UNDERWAY
$1,407,000 $1,125,600
$281,400

PROJECT: 12294X- TYPE WORK: TURN LANES

FUND: STP

LENGTH (miles I km) 0 10.00

DESCRPT: SR365 FM RAMSEY RD TO LC TURNER RD/HABERSHAMISEE HALL 122945

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 122945-

PROJECT: 131080- TYPE WORK: REALIGNMENT LENGTH (miles I km)
DESCRPT: ANTIOCH RD/CR 117 FM SR 17 TO SR 17 ALT

FUND:STP 4/6.44

PE:NONE ROW: NONE CST: NONE

PE: 1992 ROW: 2003 CST:

UNDERWAY $348,000
AFTER 2003

PROJECT: 132 I00- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 1.63 12.62

DESCRPT: SR 105/US 441 BUS FM SR 365 SE TO SOU RR & I-WAY PAIR

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 2002 CST:

UNDERWAY $1,705,000 AFTER 2003

Page 199 of336

_"'__>'1""""'_'

STATE TRANSPORTATION IMPROVEMENT PROGRAM

.."....

9121100

-._,



_4~

.........,_:W

._,_ _, "".....--,._

'HABERSHAM COUNTY

PROJECT: 13256X- TYPE WORK: REPLACE BRIDGE LENGTH ('(Iiles / km)

FUND: BRIDGE 0/0.00

DESCRPT: SR 115 @ CHATTAHOOCHEE RIVER 7.5 MI E. OF CLEVELAND/WHITE

ASSOCIATED PROJECTS: 132560-

PE:NONE ROW: NONE CST: NONE

PROJECT: 171380- TYPE WORK: MINOR WIDEN & RESURF

FUND: FOREST HWY PE: 1996

LENGTH (miles / km) 3.5/5.64

ROW: LOCL

DESCRPT: CR 240/CR 811LOW GAP RD FM CR 245INEW LIBERTY TO PVMT/RABUN

CST: 2001

FED Share:

OTHShare:

UNDERWAY
$2,500,000 $1,250,000
$1,250,000

Page 200 of336

"---,,,,-_._._---_._- --_.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

HALL COUNTY
PROJECT: 0000140 TYPE WORK: . BICYCLE/PED. FACILITY LENGTH (miles I km)
DESCRPT: GAINESVILLE" ROCK CREEK GREENWAY

FUND:STP 010.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000425 TYPE WORK: INTERCHANGE

FUND: NHS

LENGTH (miles I km) 0.4 10.64

DESCRPT: 1-985 NEW INTERCHANGE NO. Of SR 13 CROSSOVER NEAR MARTIN RD

OTHShare:
PE: 2001 ROW: NONE CST: NONE

$563,000 $450,000
$113,000 $10,000

PROJECT: 110400- TYPE WORK: INTERCHANGE

FUND: NHS

LENGTH (mileslkm) 3.4/5.47

DESCRPT: 1-985 SPLIT DIAMOND INTERCHANGE@ SR 13 & SR 53 & CD SYSTEM

PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $12,000,000 $18,266,000 \ $14,612,800 $3,653,200

PROJECT: 110465- TYPE WORK: INTERCHANGE LENGTH (miles I km)
DESCRPT: 1-985 @.SR IIIUS 129 NB EXIT LOOP & SB EXIT EXIST. LANES: 02 PROPOSED LANES: 04

FUND: NHS 1.24 12.00

PE: 1997 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $1,317,000
$11,330,000 $9,064,000 $2,266,000

PROJECT: 121780- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 2/3.22

DESCRPT: SR 53/DA WSONVILLE HWY FM CR 248 @ SARDIS E TO DUCKETT MILL

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 2002 CST:

UNDERWAY $3,898,000 AFTER 2003

PROJECT: 122010- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 369/BROWN'S BR RD FM FORSYTH CO LINE TO SR 53 EXIST. LANES: 02 PROPOSED LANES: 04

FUND:STP 4.9317.94

PE: 1992 ROW: 2003 CST:

UNDERWAY $6,390,000 AFTER 2003

PROJECT: 122020- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 53 FROM SOUTH OF SR 211 TO CEDAR RIDGE DRIVE EXIST. LANES: 02 PROPOSED LANES: 04

FUND:STP 4.4417.15

PROJECT: 12215X TYPE WORK: WIDENING

I
FUND:NHS

.

LENGTH (miles I km) 0/0.00

DESCRPT: SR II/US 129 FM SR 332 @TALMOIJACKSON CO TO SR 323/HALL CO

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 122150-

PE: 1992 ROW: 2001 CST:

UNDERWAY $11,500,000 AFTER 2003

PE:NONE

ROW: NONE

CST: NONE

..

Page 201 of336

__._-------_.,------- STATE TRANSPORTATION IMPROVEMENT PROGRAM

------------~.

9/21/00

HALL COUNTY
PROJECT: 122910- TYPE WORK: ATMSIITS LENGTH (miles I km)
DESCRPT: ATMS/ GAINESVILLE SLO SCAN/CMS/RADAR

FUND: NHS 010.00

PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$1,650,000 $1,320,000
$330,000

PROJECT: 122915- TYPE WORK: ATMS/ITS

FUND:NHS

LENGTH (miles / km) 0/0.00

DESCRPT: ATMS/ GAINESVILLE/HALL COUNTY/GDOT REGIONAL TCC

PE.:NONE ROW: NONE CST: 2003 FED Share: GA Share:

$1,000,000 $800,000 $200,000.

PROJECT: 122945- TYPE WORK: TURN LANES

FUND:NHS

LENGTH (miles / km) 17127.35

DESCRPT: SR 365 TURN LANES FM RAMSEY RD TO LC TURNER RD/HABERSHAM

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 12294X-

PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$6,801,000 $5,440,800 $1,360,200

PROJECT: 132690- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR IIIUS 129 AT JIM HOOD ROADINOPONE ROAD

FUND: STP 0.2 /0.32

PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$1,403,000 $1;122,400
$280,600

PROJECT: 13286X- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 3.9 16.28

DESCRPT: SR 53 FM 1-85/JACKSON TO ROAD ATLANTAICR 681/HALL SEE 132860

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 132860-

PE:NONE ROW: NONE CST: NONE

PROJECT: 132995- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 52 @ CANDLER CREEK 5.4 MI SOUTH OF LULA

FUND: BRIDGE 0.22/0.35

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 141820- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 2.4 /3.86

DESCRPT:SR 323/G1LLSVILLE HWY FM MP 0.4 TO MP 2.79 N/SR 82/MP 2.79

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 2002 ROW: CST:

$230,000 AFTER 2003 AFTER 2003

PROJECT: 142290- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.27/0.43

DESCRPT: SR 52 @ CHATTAHOOCHEE RIVER 3 MI NW OF LULA

PE: 2001 ROW: CST:

$31,000 AFTER 2003 AFTER 2003

Page 202 of336

--_._----------- .._---_._.._ - - - - - -
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

HALL COUNTY

PROJECT: 142292- TYPE WORK: REPLACE BRIDGE

FUND: B~IDGE.

LENGTH (miles I km) 0.22/0.35

DESCRPT: SR 323 @ NORTH OCONEE RIVER 7.5 MI SOUTH OF LULA

PE:1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 142293- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

.

LENGTH (miles I km) 0.22 10.35

DESCRPT: SR 323 @N OCONEE RIVER OVERFLOW 7.5 MI SOUTH OF LULA

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 142294- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 3~2 @ WALNUT CREEK 1.7 MI SW OF CANDLER

FUND: BRIDGE 0.23/0.37

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 150200- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 53 FM SR 369/BROWNS BRIDGE RD TO SR 53 CONN EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 1.98/3. I9

PE: 1993 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY . $381,000 $6,686,000 $5,348,800 $1,337,200

PROJECT: 170735- TYPE WORK: WIDENING

FUND: STP

LENGTH (mileslkm) 3.4/5.47

DESCRPT: LAKE LANIER ACCESS RD FM 1-985 TO LAKE (PH 11- LANES 3 & 4)

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1997 ROW: 2003 CST:

UNDERWAY $2,000,000 AFTER 2003

PROJECT:' 17154X- TYPE WORK: BRIDGE PAINTING

FUND: STP

LENGTH (miles I km) 0 10.00

DESCRPT: BRIDGE PAINTING IN GWINNETT AND HALL COUNTIESjl71545

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 171545-

PE:NONE ROW: NONE CST: NONE

PROJECT: 171620- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

. PE: 2001

LENGTH (milesI km) 0.2 I 10.34

ROW: LOCL

DESCRPT: CR 17/F. GAILEY ROAD @ EAST FORK LITTLE RIVER SW OF CLERMONT

CST: 2002

FED Share:

GA Share:

PROJECT: T000094 TYPE WORK: CAPITAL

FUND: BRIDGE

PE:NONE

LENGTH (milesI km) 0 10.00

ROW: NONI:

DESCRPT: ACCESS TO JOBS & REVERSE COMMUTE PROGRAM FOR GAINESVILLE

CST: 2001

FED Share:

OTH Share:

$20,000 $306,000 $244,800
$61,200
$300,000 $150,000 $150,000

Page 203 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9i21/00

HANCOCK COUNTY

PROJECT: 271280- TYPE WORK: BRIDGE PAINTING

FUND: STP

LENGTH (miles / km)

0 /0.00

DESCRPT: BRIDGE PAINTING IN HANCOCK AND RICHMOND COUNTIESI27Y280

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 27I28X- 27Y280-

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

PROJECT: 27Y280- TYPE WORK: BRIDGE PAINTING

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: BRIDGE PAINTING IN HANCOCK AND RICHMOND COUNTIES\27Y280

LUMP SUM PROJECT

ASSOCIATED PROJECTS: 271280-

PE:NONE ROW: NONE CST: 2001 FED Shure: GA Share:

$405,000 $324,000
$81,000
$160,000 $144,000
$16,000

Page 204 of336

---------
STATE TRANSPORTrjTIONIMPROVEMENT PROGRAM

_.. "---<----""-..,. t---"'--- , ~---~"..~.,_._--_.

9121100
'"*""

<>

~.",- ... _~ .. Iol;, ....._ ,.... _ " ' " " " ' ..._

.....I<,.,"","",~."__.

~

HARALSON COUNTY

PROJECT: 0000114 TYPE WORK: BICYCLE/PED. FACILITY

DESCRPT: TALLAPOOSA STREETSCAPE

LENGTH (miles I km)

FUND: STP 010.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$313,000 $250,000

PROJECT: 611320- TYPE WORK: REST AREA

FUND: STP

LENGTH (miles I km) 010.00

DESCRPT: TALLAPOOSA WELCOME CENTER ON 1-20 - SEWER HOOK-UP

LUMP SUM PROJECT

OTHShare:
PE: 2001 ROW: NONE CST: 2001 FED Share: GA Share:

$63,000
$60,000
$1,045,000 $940,500 $104,500

PROJECT: 611322- TYPE WORK: LANDSCAPING

FUND: NHS

LENGTH (miles I km) 0 10.00

DESCRPT: GA VISITOR CTR ON 1-20--ADD TO PARKING AREA & LANDSCAPING

PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$634,000 $507,200 $126,800

PROJECT: 621580- TYPE WORK: PASSING LANES LENGTH (miles I km)
DESCRPT: SR 120 FM W OF BUCHANAN BYP TO LAKE OLYMPIA EXIST. LANES: 02 PROPOSED LANES: 03

FUND: STP 1.2 I 1.93

PE: 1992 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $75,000
$900,000 $720,000 $180,000

PROJECT: 631143- TYPE WORK: MINOR WIDEN & RESURF

FUND: STP

LENGTH (miles I km) 4.6417.47

DESCRPT: CR 342/CASHTOWN RD/SR 898 SP FM CR 346/MORGAN RD N TO CR 345

PE: 1992 ROW: 2001 CST: 2001 FED Share: GAShare:

UNDERWAY $215,000
$2,122,000 $1,697,600
$424;400

PROJECT: 631145- TYPE WORK: MINOR WIDEN & RESURF

FUND: STP

LENGTH (miles I km) 5.28 18.50

DESCRPT: CR 342/440 FM CR 345 N TO CR I68/PLEASANT HILL RD/POLK CO

ASSOCIATED PROJECTS: 63114X-

PE: 1992 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $114,000
$2,614,000 $2,091,200
$522,800

PROJECT: 63 I 175- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.25 10.40

DESCRPT: SR 8 WIDEN;INTERSECT.IMP;BIKE-PED FM FLORIDA AVE TO BRYAN ST

PE: 1992 ROW: 2001 CST: 2001 FED Share: GA Share:

UNDERWAY $68,000
$997,000 $797,600 $199,400

PROJECT: 632915- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 120 @ LITTLE RIVER IN EAST BUCHANAN

FUND: BRIDGE

PE: 2001

0.23/0.37

ROW: 2002

CST: 2003

FED Share:

GA Share:

$20,000 $10,000 $619,000 $495,200 $123,800

Page 205 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

HARALSON COUNTY
PROJECT: 641920- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 120- EB MP 1.36-2.821 WB MP 4.62 TO 6.48 EXIST. LANES: 02 PROPOSED LANES: 03

FUND: STP 3.32/5.35

PE: 2000 ROW: 2002 CST:

UNDERWAY $267,000
AFTER 2003

PROJECT: 642000- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 2.8/4.51

DESCRPT: SR 100- NB & SB PASSING LANES NORTH OF TALLAPOOSA

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 2000 ROW: 2002 CST:

UNDERWAY $63,000
AFTER 2003

PROJECT: 642350- TYPE WORK: NEW CONSTRUCTION .

FUND: STP

LENGTH (miles / km) 2.8/4.51

DESCRPT: STOUFFEL RD FM SR 100 TO SR 81 GOLF COURSE TO SR 8 - NEW LOC

PE: 1999 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $2,000,000 $3,000,000 $2,400,000 $600,000

PROJECT: 642380- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.22 /0.35

DESCRPT: SR 100 AT WALKER CREEK 3 MI S OF TALLAPOOSA

PE: 2000 ROW: 2002 CST:

UNDERWAY $100,000
AFTER 2003

PROJECT: 642420- TYPE WORK: NEW CONSTRUCTION

FUND: STP

LENGTH (miles / km) 2.11 /3.40

DESCRPT: SR 9Q7 FM PLEASANT RDG@HUTCHESON/CARROLL TO SR 8@CASHTOWN RD

EXIST. LANES: 00 PROPOSED LANES: 02

ASSOCIATED PROJECTS: 64242X-

PE: 1999 ROW: 2002 CST:

UNDERWAY $2,000,000 AFTER 2003

PROJECT: 671200- TYPE WORK: SIDEWALKS LENGTH (miles / km)
DESCRPT: STREETSCAPES & SIDEWALKS IN THE CITY OF BREMEN

FUND: STP 0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

$431,000 $345,000
$86,000

Page 206 of336

, - - -...:.",

STATE TRANSPORTATION IMPROVEMENTPRpGRAM

_ 5 '_ _'~~_'~

~'

9/21/00

_ _ ~ ~

~

" _ . _ .... _ _,

, _ _

HARRIS COUNTY
'PROJECT: 0000097 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles I km)
DESCRPT: HAMILTON-PALMETO CREEK WALKING & BIKE CENTER

FUND: STP 0 10.00

PE:LOCL ROW: LOC'L CST: 2001 FED Share:

PROJECT: 322820- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles I km) 1.4912.40

DESCRPT: SR IIUS 27 PASSING LANE N OF HAMILTON - SB Mp 15.10-13.61

EXIST. LANES: 02 PROPOSED LANES: 03

OTH Share:
PE: 1999, ROW: 2002 CST:

$223,000 $178,000
$45,000
UNDERWAY $63,000
AFTER 2003

PROJECT: 332310- TYPE WORK: REPLACE BRIDGE LENGTH (mites I km)
DESCRPT: SR lIUS 27 @MULBERRYCREEK.7 MI ~ OF JCT SR 208

FUND: BRIDGE

PE: 1995

0.24/0.39

ROW: 2001

CST: 2001

FED Share:

GA Share:

UNDERWAY $40,000
$1,393,000 $1,114,400
$278,600

PROJECT: 33282X- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 0 10.00

DESCRPT: SR I/HAMILTON RD FM OLD MOON RD/MUSCOGEE TO FORTUNE HOLE RD

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 332820-

PE:NONE ROW: NONE CST: NONE

PROJECT: 332860- TYPE WORK: WIDENING

FUND: STP

LENGTH (mileslkm) 5.32/8.57

DESCRPT: SR 85 FM MULT-LN NR ELLERSLIE TO WAVERL Y HALL SE CITY LMTS

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1998 ROW: 2002 CST:

UNDERWAY $2,361,000 AFTER 2003

PROJECT: 332870- TYPE WORK:. WIDENING

FUND:STP

LENGTH (miles I km) 2.09/3.36

PESCRPT: SR 85 FM SOUTH CL OF WAVERL Y HALL TO NORTH CITY LIMITS

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1998 ROW: 2002 CST:

UNDERWAY $1,045,000 AFTER 2003

PROJECT: 332880- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 7.18/11.56

DESCRPT: SR 85 FM N OF WAVERL Y HALL TO SR 85 EIW SPLIT @ TALBOT CL

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1998 ROW: 2002 CST:

UNDERWAY $1,573,000 AFTER 2003

PROJECT: 333 I 55- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR IIUS 27 @ MOUNTAIN CREEK 1.6 MI N OF SR 190

FUND: BRIDGE

PE: 1999

0.2210.35

ROW: 2003

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$348,000 $278,400
$69,600

Page 207 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

HARRIS COUNTY
PROJECT: 333156- .TYPE WORK: REPLACE BRIDGE . LENGTH (miles / km)
DESCRPT: SR 103 @ FLAT SHOALS CREEK 11.2 MI W OF SR 116

FUND: BRIDGE 0.26 /0.42

PE: 1999 ROW: 2001 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 343030- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.39 /0.63

DESCRPT: SR 219 AT HOPEWELL CHURCH ROAD/CR 388 IN WHITESVILLE

PE: 1998 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $50,000
$109,000 $87,200 . $21,800

PROJECT: 343040- TYPE WORK: INTERSECTION IMPROVEMENT. FUND: STP LENGTH (miles / km) 0.55 /0.89
DESCRPT: SR 219 AT MCCRARY RD/CR 124 AND LICK SKILLET ROAD/CR 389

PE: 1998 ROW: 200\ CST: 2002 FED Share: GA Share:

UNDERWAY $50,000
$1,000,000 $800,000 $200,000

PROJECT: 343370- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.21 /0.34

ROW: 2003

DESCRPT: SR 116 @ LITTLE PALMETTO CREEK HAMILTON - NE SECTION

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$554,000 $443,200 $110,800

PROJECT: 343371- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 116 @ PALMETTO CREEK 1.4 MI E OF SR I

FUND: BRIDGE

PE: 1999

0.22/0.35

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$786,000 $628,800 $157,200

PROJECT: 343372- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles r km) 0.22/0.35

ROW: 2001

DESCRPT: SR 116 @BETHLEHEM CREEK 6 MILES NE OF HAMILTON

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$318,000 $254,400
$63,600

PROJECT: 371770- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

PE: LOCL

LENGTH (miles 1 km) 010.00

ROW: LOCL

DESCRPT: CORRIDOR FROM NEW DEAL SETTLEMENT TO CHAT-FLINT HERITAGE HWY

CST: 2001

. FED Share:

OTH Share:

$301,000 $241,000
$60,000

Page 208 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

HART COUNTY
PROJECT: 0000166 TYPE WORK: SIDEWALKS LENGTH (miles / km)
DESCRPT: HARTWELL STREETSCAPE

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 110782- TYPE WORK: INTERCHANGE LENGTH (miles / km)
DESCRPT: 1-85 @ SR 106; SR 17 FRANKLIN & SR 77 HART CO. llO?80

FUND: 1M 0/0.00

OTHShare:
PE:NONE ROW: NONE CST: NONE

ASSOCIATED PROJECTS: 110780-

$1,125,000 $900,000
$225,000


Page 209 of336

I

i:. '

, ' . . . .~

f..

J :

'. t.

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_.. ..._,_._._._._ _

9/21/00 110_

.__

_ ._ _ __ ~'~

HEARD COUNTY

PROJECT: 362930- TYPE WORK: WIDENING

FUND: HPP

LENGTH (miles / km) 12.4 /20.00

..

DESCRPT: SRI/US 27 FM SR 54ffROUP TO PATTERSON (SOME NEW LOC)& YIX EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 36293X- 36Y930-

PE: 1992 ROW: 2001 CST:

UNDERWAY $6,000,000 AFTER 2003

Page 210 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
.. .... - -,--,..,.,.~...,.,.,.....,. )--~-,",,-'-~---~'''_:~;'''''"'----_._---'-~._' -- _

HENRY COUNTY

PROJECT: 0000561 TYPE WORK: REALIGNMENT

FUND: STP

PE: LOCL

ATLANTATMATIP#HEIIO

LENGTH (miles 1 km) 1.5/2.42

ROW: LOCL

DESCRPT: JODECO RD RELOCATION FM OAK GROVE RD TO SR 42 @CAMPGROUND RD

CST: 200 I

EXIST. LANES: 00 PROPOSED LANES: 02

FED Share:

PROJECT: 0000562 TYPE WORK: WIDENING

FUND: STP

ATLANTA TMA TIP # HE 126B

LENGTH (miles 1 km) 5.1 18.21

DESCRPT: HAMPTON-LOCUST GROVE RD FM STRICKLAND RD TO 1-75: PHASE I

EXIST. LANES: 02 PROPOSED LANES: 04

OTHShare:
PE: LOCL ROW: LOCL CST: 2003 FED Share:

PROJECT: 0000883 TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # AR 157

LENGTH (miles / km)

DESCRPT: SR 138 AT FLAT ROCK ROAD/CR 100

LUMP SUM PROJECT

FUND:STP 0.47/0.76

OTHShare:
PE: 2000 ROW: LOCL . CST: 2002 FED Share: GA Share:

$2,551,000 $2,041,000
$510,000
$10,000,000 $8,000,000 $2,000,000 UNDERWAY
$336,000 $302,400
$33,600

PROJECT: 0001055 TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # AR 157

LENGTH (miles / km)

DESCRPT: SR 155 AT RACE TRACK ROADICR 376

LUMP SUM PROJECT

FUND:STP 0.42/0.68

PE: 2000 ROW: LOCL CST: 2002 FED Share: GA Share:

$38,000
$382,000 $343,800
$38,200

PROJECT: 24538X- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0/0.00

DESCRPT: SR 20@ SOUTH RIVER NEWTON-HENRY CO LINEISEE NEWTON 245380

ASSOCIATED PROJECTS: 245380-

PE:NONE ROW: NONE CST: NONE

PROJECT: 311840- TYPE WORK: INTERCHANGE

FUND: 1M

ATLANTA TMA TIP # HE AR 209

LENGTH (miles / km) . 0.42 /0.68

DESCRPT: 1-75 @ JONESBORO ROAD/SR 920

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995. ROW: 1998 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$4,342,000 $3,907,800
$434,200

PROJECT: 312150- TYPE WORK: INTERCtlANGE

FUND:NHS

ATLANTA TMA TIP # HE AR 215

LENGTH (miles / km) 0.55 /0.89

DESCRPT: 1-75@ HUDSON BRIDGE RD/EAGLES LANDING PKWY/CR 659-BR REPL

EXIST. LANES: 02 PROPOSED LANES: 06

PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:

UNDERWAY
$10,500,000 $8,400,000 $2,100,000

PROJECT: 321145- TYPE WORK: RECST/REHAB

FUND: STP

ATLANTA TMA TIP # HE 0 I0

LENGTH (miles / km) 11.3 /18.11

DESCRPT: N-S 1-WAY PAIR/MCDONOUGH FM N/RACETRACK RD TO N/CARMICAEL

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 321530- 32R145-

PE: 1992 ROW: 1997 CST: 2003 FED Share: GA Share:

UNDERWAY UNDERWAY $1,417,000 $1,133,600
$283,400 ...

Page 2 J] of336

__ - - - - - - - - - - - - - - - - - _ . - ._-----_._--_._-_ ._.__ -_._-_ _.__ __ _ .
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. . . ._.,""---_.-. _-g-_...-. 9/21/00
-----~---------_~-~,_ _~"""----- ,--"~

HENRY COUNTY

PROJECT: 323070-' TYPE WORK: INTERSECTION IMPROVEMENT

ATLANTA TMA TIP # HE 145

LENGTH (miles 1 km)

DESCRPT: SR 138 AT MILLERS MILL ROAD/CR 665

FUND: STP 0.2 10.32 .

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$360,000 $324,000 $36,000

PROJECT: 332467- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTATMA TIP # HE 128

LENGTH (miles 1 km) 0.42/0.68

ROW: 2001

DESCRPT: SR 155 @ LITTLE COTTON INDIAN CRK 5 MI N OF MCDONOUGH

CST: 2003

FED Share:

GA Share:

UNDERWAY $50,000
$608,000 $486,400 $121,600

PROJECT: 332945- TYPE WORK: SIGNALS

FUND:STP

ATLANTA TMA TIP# HE 122

LENGTH (miles 1 km) 0.42/0.68

DESCRPT: SR 81 AT KEYS FERRY RD

PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 332970- TYPE WORK: SIGNALS

ATLANTA TMA TIP # HE 123

LENGTH (miles 1 km}

DESCRPT: SR 81 AT NEW HOPE RD

FUND:STP 0.2/0.32

OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 332975- TYPE WORK: SIGNALS ATLANTA TMA TIP # HE 124 DESCRPT: SR 81 AT RACETRACK RD

LENGTH (miles / km)

FUND: STP 0.2/0.32

OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 332980- TYPE WORK: SIGNALS

ATLANTA TMA TIP # HE 120

LENGTH (miles / km)

DESCRPT: SR 155 AT FAIRVIEW RD

FUND:STP 0.2/0.32

OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 333126- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

ATLANTA TMA TIP # HE 154

LENGTH (miles 1 km) 0.23/0.37

ROW: 2001

DESCRPT: SR 155 @ WALNUT CREEK AT MCDONOUGH CITY LIMITS

CST: 2003

FED Share:

GA Share:

$34,000 $27,000 $7,000
$36,000 $29,000
$7,000
$34,000 $27,000
$7,000
$43,000 $34,000
$9,000 UNDERWAY
$10,000 $813,000 $650,400 $162,600

'!.

PROJECT: 333127- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

UNDERWAY

ATLANTA TMA TIP # HE 155

LENGTH (miles / km) 0.25/0.40

ROW: 2001

$10,000

DESCRPT: SR 155 @ BIG COTTON INDIAN CREEK 6 MI N CF MCDONOUGH

CST:

AFTER 2003

!:l

Page 212 0/336

--_._--,---------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

HENRY COUNTY

PROJECT: 343060- TYPE WORK: WIDENING

FUND: STATE

ATLANTA TMA TIP # HE 104

LENGTH (miles I km) 9.2 /14.81

DESCRPT: SR 20 & WOOLSEY RD RELOC FM CR 1336 TO 1-75 INCL HAMPTON BYP

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1998 ROW: 2001 CST: 2001
GA Share:

UNDERWAY
$16,951,000
$33, I 58,000
..
$33,158,000

PROJECT: 343260- TYPE WORK: SIGNALS

ATLANTA TMA TIP # HE 121

LENGTH (miles I km)

DESCRPT: SR 155 @HAMPTON/LOCUST GROVE RD

FUND: STP 0.2 10.32

PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 343265- . TYPE WORK: MINOR WIDEN & RESURF

FUND: STP

ATLANTA TMA TIP # HE 126A

LENGTH (miles I km) 4.0816.57

DESCRPT: CR 650/HAMPTON/LOCUST GROVE RD FM SR 20 TO STRICKLAND RD

EXIST. LANES: 02 PROPOSED LANES: 04

OTHShare:
PE: 2001 ROW: LOCL CST:
GA Share:

$37,000 $30,000 $7,000 $5,000 AFTER 2003
$0

PROJECT: 351230- TYPE WORK: SIGNALS

ATLANTA TMA TIP# HE 125

LENGTH (mileslkm)

DESCRPT: WALT STEPHENS RD AT SPEER RD

FUND: STP 0.2/0.32

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 363860- TYPE WORK: PARK & RIDE LOT

FUND: STP

ATLANTA TMA TIP # HE 119

LENGTH (mileslkm) 0/0.00

DESCRPT: JODECO RD EXPAND PARK & RJDE LOT & RELOCATE OCTAGON RD

OTH Share:
PE: 2000 ROW: 2001 CST: 2001 FED Share:

OTH Share:

PROJECT: 363875- TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE:LOCL

ATLANTA TMA TIP # HE AR BP006

LENGTH (miles I km) 0 10.00

ROW: LOCL

DESCRPT: FAIRVIEW RD FM EAST ATLANTA RD TO FAIRVIEW ELEMENTARY

CST: 2002

FED Share:

OTH Share:

PROJECT: 363876- TYPE WORK: BICYCLE/PED. FACILITY

FUND: CMAQ

PE:LOCL

ATLANTA TMA TIP # HE AR BPOI8C

LENGTH (miles I km) 2.4 13.86

ROW: LOCL

DESCRPT: MCDONOUGH EW ONE WAY PAIR FM JONESBORO RD TO KEYS FRY RD

CST: 2001

FED Share:

OTH Share:

PROJECT: 363877- TYPE WORK: BlCYCLE/PED. FACILITY

FUND: CMAQ

ATLANTA TMA TIP # HE AR BPOl8B

LENGTH (mileslkm) 2.4/3.86

PE: LOCL ROW: LOCL

DESCRPT: MCDONOUGH NS ONE WAY PAIR FM GRIFFI}'; ST TO MACON ST&SIDEW ALK . CST: 200 I . FED Share:

.\ OTH Share:

$43,000 $34,000 $9,000 UNDERWAY $360,000 ,. $1,200,000 $960,000 $240,000
$329,000' $263,000 $66,000
$180,000 $144,000
$36,000
$225,000
. $180,000
$45,000

Page 2/3 of336

_ _ _M._._. ._.

'J



STATE TRANSPORTATION IMPROVEMENT PROGRAM

.__._.._. , .

9121,.1._0._0 _" ~.,

__. ~_. "...,. __...

.. _

HENRY COUNTY
PROJECT: 3V7040- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE:NONE

0/0.00

- ROW: NONE

CST: 2001

FED Share:

GA Share:

$13,000 $13,000
$4,000

PROJECT: 71407X- TYPE WORK: ATMS/ITS

FUND:NHS

ATLANTA TMA TIP# AR 307

LENGTH (miles/ km)

0/0.00

DESCRPT: ATMS/I-75 COMM/SURVEIL FM HUDSON BR RD TO TARA BLVD/CLAYTON

ASSOCIATED PROJECTS: 714075-

PE:NONE ROW: NONE CST: NONE

PROJECT: 72148X- TYPE WORK: WIDENING

FUND:NHS

ATLANTA TMA TIP # CL 031

LENGTH (miles / km) 0/0.00

DESCRPT: SR 138 FM WALT STEPHENS RD/CLA YTON TO 1-75...SEE CLAYTON CO

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 721480-

PE:NONE ROW: NONE CST: NONE

PROJECT: TOOOOl8 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 HENRY COUNTY SECTION 5310

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$14,000 $14,000 $3,000

PROJECT: T000028 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 HENRY COUNTY SECTION 5310

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

$14,000 $14,000 $4,000

Page 214 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9121100

HOUSTON COUNTY
PROJECT: 0000125 TYPE'WORK:
DESCRP:r: PERRY STREETSCAPE

BICYCLE/PED. FACILITY LENGTH (miles I km)

FUND: STP 010.00

PE: LOCL ROW: LOCL CST: 2001 FED Shure:

PROJECT: 0000126 TYPE WORK: BICYCLE/PED. FACILITY

WARNER ROBINS TIP # 2000-2

LENGTH (miles I km)

DESCRPT: CENTERVILLE SIDEWALK SApETY IMPROVEMENTS

FUND: STP 2.45 13.94

OTH Shure:
PE: LOCL ROW: LOCL CST: 2002 FED Shure:

PROJECT: 0000909 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

WARNER ROBINS TIP #

LENGTH (miles I km) 0.28/0.45

DESCRPT: SR 96 AT CR 540ITHOMPSON MILL ROAD/CR 108/0AKY WOODS ROAD

LUMP SUM PROJECT

OTH Shure:
PE: 2000 .ROW: 2002
CST: 2003 FED Shure:
GA Share:

$875,000 $700,000
$175,000
$163,000 . $130,000
$33,000 $21,000 $10,000 $374,000 $336,600 $37,400

PROJECT: 0001018 TYPE WORK: BICYCLE/PED. FACILITY

FUND: RECTRAILS PE.NONE

WARNER ROBINS TIP#

, LENGTH(miles/km) 1.07/1.72

ROW: NONE

DESCRPT: DNR REC TRAILS-BAYGALL CREEK GREENWAY FM CORDER TO KIMBERLY

CST: 2001

FED Share:

OTHShare:

PROJECT: 322960- TYPE WORK: WIDENING

FUND: NHS

WARNER ROBINS TIP # 1998-2

LENGTH (miles / km) 2.65 14.27

DESCRPT: SR 247/US 129 FM GREEN STREET/GATE'1 TO US 41 IN BIBB

EXIST. LANES: 04 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 32296X- 322965-

PE: 2001 ROW: CST:

$125,000 $100,000
$25,000
$1,500,000 AFTER 2003 AFTER 2003

PROJECT: 322965- TYPE WORK: REPLACE BRIDGE .

FUND: BRIDGE

PE: 2001

WARNER ROBINS TIP # 1998-1...

LENGTH (miles I km) 0.27 10.43

ROW: 2001

DESCRPT: SR 247/US 129 NBL @ ECHECONNEE CREEK HOUSTON-BIBB CO LINE.

CST: 2002

EXIST. LANES: 02 PROPOSED LANES: 03

FED Share:

ASSOCIATED PROJECTS: 322960-

GA Shure:

$15,000 $12,000 $3,000,000 $2,400,000 $600,000

PROJECT: 33 I830- TYPE WORK: WIDENING

FUND: STP

WARNER ROBINS TIP # WR I992-1

LENGTH (miles I km) 4 16.44

DESCRPT: HOUSTON LAKE RD FM SR 127@CR279TO SR 96/& INTER@CR 188

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 2001 CST:

UNDERWAY $2,000,000 AFTER 2003

PROJECT: 331860- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 2.65 14.27

DESCRPT: SR 127 FM NORTH PERRY BYPASS TO E OF LAKE JOY ROAD

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 33 I865-

PE: 1994 ROW: 2001 CST: 2003 FEDShllre: GA Share:

UNDERWAY $1,536,000 $7,540,000 $6,032,000 $1,508,000

Page 2/5 of336

STATE TRANSPORTATION IMpROVEMENT PROGRAM
9/21/00

HOUSTON COUNTY

PROJECT: 331865- TYPE WORK: BRIDGE REHAB

WARNER ROBINS TIP # WR 1-1993(5)

LENGTH (miles / km)

DESCRPT: SR 127 AT MOSSY CREEK ILET WITH 331860

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 331860-

FUND: BRIDGE

PE: 1994

0.03 /0.05

~ ROW: NONE

CST: 2003

FED Share:

GA Share:

UNDERWAY
$891,000 $712,800 $178,200

PROJECT: 342340- TYPE WORK: INTERSECTION IMPROVEMENT'

FUND: STP

WARNER ROBINS TIP # WR 1985-6

LENGTH (miles / km) 4.817.73

DESCRPT: SR 247C FM NELSON DRIVE TO SR 247 - INCL INTER IMPROVE

PE: 1992 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$478,000 $430,200
$47,800

PROJECT: 350840- TYPE WORK: WIDENING

FUND: STP

WARNER ROBINS TIP # WR1991-2

LENGTH (miles/ km) 2.81/4.52

DESCRPT: HOUSTON LAKE RD/CR 535 FM SR 96 TO RICHARD RUSSELL PKWY

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY $8,588,000 $6,870,400 $1,717,600

PROJECT: 351070- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

WARNER ROBINS TIP # WR 1-1996( I)

LENGTH (miles / km) 0.26 /0.42

ROW: LOCL

DESCRPT: CR I56/MOODY ROAD @ BAY GALL CREEK IN WARNER ROBINS

CST: 2001

FED Share:

GA Share:

UNDERWAY
$822,000 . $657,600
$164,400

PROJECT: 36376X- TYPE WORK: NEW CONSTRUCTION

FUND: BRIDGE

WARNER ROBINS TIP # WR 1-1996(2)

LENGTH (miles / km) 0/0.00

DESCRPT: RICHARD RUSSELL PKWY FM E OF 1-75 TO CORDER RD/PEACH

ASSOCIATED PROJECTS: 363760-

PE:NONE ROW: NONE CST: NONE

PROJECT: 371730- TYPE WORK: MINOR WIDEN & RESURF

FUND: HPP

WARNER ROBINS TIP# 2000-1

LENGTH (miles! km) 0/0.00

DESCRPT: DAVIS DRI GREEN ST & N HOUSTON RD IN WARNER ROBINS

PE:LOCL ROW: NONE CST: 2002 FED Share:

PROJECT: TOOOl62 TYPE WORK: CAPITAL

WARNER ROBINS TIP #

LENGTH (miles / km)

DESCRPT: FY 2001 WARNER ROBINS SECTION 5310

OTH Share:

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$367,000 $294,000
$73,000
$17,000 $17,000 $4,000

PROJECT: TOOOl63 TYPE WORK: CAPITAL

WARNER ROBINS TIP #

LENGTH (miles / km)

DESCRPT: FY 2002 WARNER ROBINS SECTION 5310

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

-, GA Share:

$18,000 $18,000
$4,000

Page216of336

STATE TIUNSPORTATION IMPROVEMENT PROGRAM

9/21/00

,

...

....,. _ _ . ~ ............

,._

.,

I

'

t_

_

~

_

.
'

K

_

,

"

'

_...........

...

~"

_'''~

.._ .

_

~

...

_

...... ....._ ~_

HOUSTON COUNTY

PROJECT: T000200 TYPE WORK: CAPITAL

WARNER ROBINS TIP #

LENGTH (miles 1 km)

DESCRPT: FY 2003 WARNER ROBINS SECTION 5310

FUND: TRANSIT

PE: NONE

010.00

ROW: NONE

CST: 2003,

FED Share:

GA Share:

$18,000 $18,000
$5,000

".

Page 217 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

JACKSON COUNTY
PROJECT: 0000167 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles I km)
DESCRPT: HOSCHTON RR DEPOT REHAB

FUND: STP 010.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 0001258 TYPE WORK: RIGHTS-OFWAY

FUND: STATE

LENGTH (miles I km) 010.00

DESCRPT: SR 1007/CONNECTOR ROAD PM SR 335 TO SR 15/US441 IN NICHOLSON

PE:NONE ROW: 2001 CST: LOCL

$40,000 $32,000
$8,000
$40,000

PROJECT: 110520- TYPE WORK: REST AREA

FUND: 1M

LENGTH (miles I km) 0 10.00

DESCRPT: 1-85 CONSTRUCT NEW REST AREAS TO REPLACE # 75 AND # 76

PE: 1997 ROW: 2003 CST:

UNDERWAY $423,000
AFTER 2003

PROJECT: 121340- TYPE WORK: BRIDGE REHAB LENGTH (miles I km)
DESCRPT: SR 11/ US 129/ @ ALLEN CREEK N OF TALMO
ASSOCIATED PROJECTS: .122150-

. FUND: BRIDGE

PE: 1986

0.2510.40

ROW: NONE

CST: 2003

FED Share:

GA Share:

UNDERWAY
$460,000 $368,000
$92,000

PROJECT: 122150- TYPE WORK: WlDENING

FUND:NHS

LENGTH (miles I km) 7.4 I 11.91

DESCRPT: SR I1IUS 129 FM SR 332 @TALMO/JACKSON CO TO SR 323/HALL CO

EX1ST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 12215X- 121340-

PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $4,700,000 $9,470,000 $7,576,000 $1,894,000

PROJECT: 12216X- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 010.00

DESCRPT: SR 15 ALT/US 129 FM LAVENDER DR/CLARKE TO SR 330/JACKSON

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 122160-

PE:NONE ROW: NONE CST: NONE

PROJECT: 122170- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 6.7 I 10.79

DESCRPT: SR 15 ALT/US 129 FM SR 330 TO JEFFERSON BYP@CR 104

EXIST. LANES: 02 PROPOSED LANES: 04

PE:1992 ROW: 2003 CST:

UNDERWAY $2,741,000 AFTER 2003

PROJECT: 122300- TYPE WORK: WIDENING LENGTII(mileslkm)
DESCRPT: SR 15/US 441 FM S OF CLARKE COUNTY LlNE TO SR 335 EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STATE 6.71/10.80

PE: 1993 ROW: 2002 CST:

UNDERWAY $3,985,000 AFTER 2003

Page 218 of336

STAT'4 TRANSPORTATION IMPROVEMENT PROGRAM

_ _ _ _ _ _ _ _ _ _ _-.......--.., - _..*

JO.,,_. 9/21/00

,

._.~

... _ _ ..., __':AI_.N~

~

JACKSON COUNTY
PROJECT: 122310- TYPE WORK: WIDENING LENGfH (miles I km)
DESCRPT: SR 15/US 441 FM SR 335 TO COMMERCE BYPASS EXIST. LANES: 02 PROPOSED LANES: 04

FUND:NHS 5.19/8.36

PE: 1993 ROW: 2002 CST:

UNDERWAY $6,050,000 AFTER 2003

PROJECT: 122510- TYPE WORK: BRIDGE REHAB LENGTH (miles / km)
DESCRPT: SR 15 ALT IN JEFFERSON AT BIG CURRY CREEK EXIST. LANES: 02 PROPOSED LANES: 03

FUND: BRIDGE

PE: 1993

0.15/0.24

ROW: 2001

CST: 2003

FED Share:

GA Share:

UNDERWAY $20,000
$822,000 $657,600 $164,400

PROJECT: 132860- TYPE WORK: WIDENING

FUND: STP

LENGTH (mileslkm) 3.9/6.28

DESCRPT: SR 53 FM 1-85 IN JACKSON CO TO SR 211IT ANNERS MILL IN HALL

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: I3286X-

PE: 200\ ROW: CST:

$750,000 AFTER 2003 AFTER 2003

PROJECT: 171002- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0.2/0.32

PE: 1994 ROW: LOCL

DESCRPT: CR 367/WHlTES BOTTOM ROAD@WALNUTCREEKNEOFBRASELTON

CST: 2002 FED Share:

GA Share:

UNDERWAY
$353,000 $282,400
$70,600

PROJECT: 171004- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.5 10.81

PE: 1997 ROW: LOCL

DESCRPT: CR 86/JEFFERSON RIVER RD @ CURRY CREEK 3.6 MI E OF ARCADE

CST: 2001 FED Share:

GA Share:

UNDERWAY
$612,000 $489,600 $122,400

PROJECT: 171005- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (mileslkm) 0.2/0.32

ROW: LOCL

DESCRPT: CR 248/HARMONY CHURCH RD @ POND FORK CREEK NE OF TALMO

CST: 2001

FED Share:

GA Share:

UNDERWAY
$385,000 . $308,000
$77,000

Page 219 of336

.. ' ;

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00
...._ .... ' " """';_\o~

- - " -_ _~ _ . " " '

"'~""-""'''''''''-'~_'''l

''',_'''''l'_ _

. JASPER COUNTY

PROJECT: 0000152 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

PE: LOCL

LENGTH (miles r km) 0/0.00

ROW: LOCL

DESCRPT: MONTICELLO STREETSCAPE/WELCOME CTRJTRAILHEAD/MUSEUM/BIKEWAY CST: 200 I

FEDShl/re:

ASSOCIATED PROJECTS: 0000995

OTH Share:

PROJECT: 0000423 TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 0.87/ 1.40

DESCRPT: SR 16 WIDENING AT WEST CITY LIMITS OF MONTICELLO

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2003 ROW: CST:

$1,000,000 $800,000
$200,000
$189,000 AFTER 2003 AFTER 2003

PROJECT: 0000426 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR I I AT POST ROAD/CR 362

FUND: STP 0.2 10.32

PE: 2003 ROW: CST:

$5,000 AFTER 2003 AFTER 2003

PROJECT: 0000995 TYPE WORK: SCENIC HWY PROGRAM

FUND: STP

PE: LOCL

LENGTH (mileslkm) 0/0.00

ROW: LOCL

DESCRPT: MONTICELLO CROSSROADS SCENIC BYWAY INFO CTR & MARKETING PLAN

CST: 200 I

FED Share:

ASSOCIATED PROJECTS: 0000152

GA Shure:

OTH Shure:

PROJECT: 231730- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 4.64 17.47

DESCRPT: SR 83 NB MP 0-I.7214-LN/4' MED MP 18.1-I9.81INB 19.81-21.04

EXIST. LANES: 02 PROPOSED LANES: 04

PE:2001 ROW: 2002 CST:

$899,000 $719,200 .$29,800 $150,000
$388,000 $63,000
AFTER 2003

PROJECT: M000355 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) 010.00
DESCRPT: SR 83 PIPE REPLACEMENT LUMP SUM PROJECT

PE: 1997 ROW: 1999 CST: 2001 FEDShl/re: GA Share:

UNDERWAY UNDERWAY
$300,000 $240,000
$60,000

Page 220 of336

...- . - - - - - - - , - - - - - - - - - - - - - - - - - - - - - - - - - - -
, -STATE T.fUN$P0R.TATIO/yIMPROVEMENT PROGRAM
9/21/00

JEFF DA VIS COUNTY

PROJECT: 523260- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENG,TH (miles 1 km) 0,43/0,69

PE: 1999 ROW: 2001

DESCRPT: SR 19/US 23 NBL@ OCMULGEE RIVER 5,8 MI NW OF HAZLEHURST

CST: 2002

FED Share:

GA Share:

UNDERWAY $20,000
$6,611,000 $5,288,800 $1,322,200

PROJECT: 533177- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles Ikm) 0,23/0.37

DESCRPT: SR 135/US 221 @ HURRICANE CREEK 6,8 MI SW OF HAZLEHURST

PE: 2001 ROW: 2002 CST:

$20,000 $10,000 AFTER 2003

"

Page 22] 0/336

",," _ _ ~N'-"

STATE TRANSPORTATION IMPROVEMENT PROGRAM

'~"_"

'

9/21/00

<1OO . . . . .

~

...._ _ . . . _

.._... _ _,..,,_.._ _,_ ,_....,..l">'_.,_~_

JEFFERSON COUNTY

PROJECT: 222295- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 9.4/15.13

DESCRPT: SR 88/SR 540 FM SR 171 AT GRANGE TO SR 296 SW OF WRENS

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 1999 CST: 2001
GA Share:

UNDERWAY UNDERWAY $19,225,000
$19,225,000

PROJECT: 22229X- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 88 FM CR I06/WASHINGTON TO SR 171/222290 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 222290-

FUND: STATE 0/0.00

PE:NONE ROW: NONE CST: NONE

PROJECT: 22Y120- TYPE WORK: WIDENING

FUND:NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 4IUS I FM WADLEY BYP TO LOUISV'LE BYP- FOR FED PE; 222 I20

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 222 I20-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 22Y I50- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 4/US I/L'VILLE BYP FM USI BUS TO CR 325-FOR FED PE;222150

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 222 I50-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 22Y160- TYPE WORK: WIDENING

FUND:NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 4/US I FM LOUISVILLE BYP TO CR 138 - FOR FED PE; 222160

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 222 I60-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 22Y I70- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 4/US I FM CR 138 TO SR 88/FALL'LINE FWY-FOR FED PE;222170

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 222170-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 231230- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 24/US 221 EB MP 12.6-13.8IWB 1O.0-II.3IEB 3.2-4.3 EXIST. LANES: 02 PROPOSED LANES: 03

FUND: STP 3.6/5.80

PE: 1997 ROW: 2002 CST:

UNDERWAY $50,000
AFTER 2003

PROJECT: 23126X- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: SR 24 WB MP 22-23 .3/EB 24.3-25.6/WB 29-30.3&n-l. I/BURKE

ASSOCIATED PROJECTS: 231260-

PE:NONE ROW: NONE CST: NONE

Page 222 of336

----"_.,--_._------_._----_._-_._-"",,._----
STATE TRANSPORTATION IMPROVEMENT PROGRAM

. __. . . . '. ..""-,.,,';-_.."',. .>---"'.-.......-__._. .,----_...."'<".--'"..:_~---.,.-_

~,... ~ ,".,.-~

9/21/00

_---,~_-.-.._.;.,--",....".-''''''.....,..,--

JEFFERSON COUNTY

PROJECT: 231980- TYPE WORK: REPLACE BRIDGE

FUND: STP

LENGTH (miles/kin) 0.53/0.85

DESCRPT: SR 24/US 221 @ROCKY COMFORT CREEK WEST SIDE OF LOUISVILLE

PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $50,000
$2,288,000 $1,830,400
$457,600

PROJECT: 232265- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 4/US I @ BIG CREEK 9 MI N OF LOUISVILLE

FUND: BRIDGE

PE: 2001

0.22/0.35

ROW: 2002

CST: 2003

FED Share:

GA Share:

$20,000 $10,000 $668,000 $534,400 " $133,600

PROJECT: 232281- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

LENGTH (miles / km) 0.27/0,43

DESCRPT: SR 4 BUS US I BUS @ WILLIAMSON SWAMP CREEK CITY OF WADLEy

PE: 1999 ROW: 2001 CST:

UNDERWAY $10,000
AFTER 2003

. PROJECT: 245390- TYPE WORK:. REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 17 @ BIG CREEK 3 MI SE OF LOUI~VILLE

FUND: BRIDGE 0.23/0.37

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page 223 of336

-------_._------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

JENKINS COUNTY

PROJECT: 221640- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km}

FUND:NHS 1.812.90

DESCllPT: SR'23/US 25 FM NORTH OF SR 23 TO SR 17 BYPASS & BRIDGES (Y)

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 22Y640-

PE: 1996 ROW: 2001
CST: 2001 FED Shure:
GA Share:

UNDERWAY $250,000
$5,019,000 $4,015,200 . $1,003,800

PROJECT: 222530- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 5.7/9.18

DESCRPT: SR 67/SAVANNAH RIVER PARKWAY FM CR 190 TO SR 121

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 2001 CST:

UNDERWAY $1,954,000 AFTER 2003

PROJECT: 222540- TYPE WORK: WlDENING

FUND: STATE

LENGTH (miles / km) 5.27/8.48

DESCRPT: SR 23/SR 12llUS 25 SAV RV PKWY FM SR 67 TO SR 21 & BR [EXC]

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 2002 CST:

UNDERWAY $8,009,000 AFTER 2003

PROJECT: 222550- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 9.2 / 14.8I

DESCRPT: SR I2\1US 25/SAVANNAH RVR PKWY FM CR 16 TO CR 118/BURKE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIA TED PROJECTS: 22255X-

PE: 1993 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $2,283,000
$12,339,000 $9,871,200 $2,467,800

PROJECT: 22Y640- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRPT: SR 23IUS 25 BRIDGES AT OGEECHEE RVR AND 2 OVERFLOWS FOR QIO$

CST: 2001

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 221640-

GA Share:

$10,000,000 $8,000,000 $2,000,000

PROJECT: 245365- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles Zkm) 0.23/0.37

DESCRPT: SR 23 @ BEAVERDAM CREEK I 1.7 MI NW OF MILLEN

.'

PE: 2003 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 262165- TYPE WORK: WIDENING

FUND: HPP

LENGTH (miles / km) 6.96/ I 1.2I

DESCRPT: SR 21/SAV RVR PKWY FM CR 174 TO MILLEN BYPASS/SCREVEN COUNTY

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 26216X-

PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY $13,093,000 $10,474,400
$2,618,600

Page 224 of336

STATErRANSp01lTAT10N IMPROVEMENT PROGRAM
9/21/00

JOHNSON COUNTY.

PROJECT: 222190- TYPE WORK: PASSING LANES

FUND: STP

. LENGTH (miles / km) 4.14 /6.67

DESCRPT: SR 15 AT 3 LOC BTWN WR'IGHTSVILLE & TENNILLE/& WASHINGTON

EXIST. LANES: 02 PROPOSED LANES: 03

ASSOCIATED PROJECTS: 22219X-

PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $116,000
$3,341,000 $2,672,800
$668,200

PROJECT: 23200X- TYPE WORK: PASSING LANES

.

. LENGTH (miles / km)

DESCRPT: SR 31/US 319 NB MP 31.0-32.41 SB 38.8-3.4 /LAURENS-232000

EXIST. LANES: 02 PROPOSED LANES: 03

ASSOCIATED PROJECTS: 232000-

FUND: STP 0/0.00

PE:NONE ROW: NONE CST: NONE

PROJECT: 232285- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 57 @ LITTLE OHOOPEE RIVER .5 MI E OF KITE

FUND: BRIDGE

PE: 19.99

0.29/0.47

ROW: 2003

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$2,128,000 $1,702,400
$425,600



Page 125 of336

---_._----_.

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

JONES COUNTY

PROjECT: 322540- TYPE WORK: NEW CONSTRUCTION

FUND: STP

LENGTH (miles 1 kin) 4/6.44

DESCRPT: GRAY NORTH BYPASS/SR 899 FM GREEN SETTLEMENT RD NE TO SR 22

EXIST. LANES: 00 PROPOSED LANES: 02

PE: 1999 ROW: 2002 CST:

UNDERWAY $823,000
AFTER 2003

PROJECT: 322790- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles 1 km) 3.8/6.12

DESCRPT: SR 44/US 129 SB MP 12.67-14.171 NB MP 1.0-2.21 NB MP 10.7-12

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1997 ROW: 2002 CST:

UNDERWAY $67,000
AFTER 2003

PROJECT: 322892- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 49 @ COMMISSIONER CREEK 7MI SE OF GRAY

FUND: BRIDGE 0.22/0.35

PE: 1999 ROW: 2003 CST: .

UNDERWAY $50,000
AFTER 2003

PROJECT: 332960- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles 1 km) 0.2/0.32
DESCRPT: SR 49 ON SOUTHBOUND SIDE @ MP 2.0-2.1--SLIDE REPAIR

PE: 1998 ROW: 2001 CST: 2001 FEDSllare: GA Share:

UNDERWAY $769,000 $993,000 $794,400 $198,600

PROJECT: 333100- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles 1 km) 0.2 10.32
DESCRPT: SR 22/US 129 -- DRAINAGE IMPROVEMENT NEAR JEFFERSON STREET

PE: 2001 ROW: CST:

$5,000 AFTER 2003 AFTER 2003

PROJECT: 343085- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles 1 km) 1.8 12.90

DESCRPT: SR 18 EASTBOUND FROM MP 24.39/JONES TO MP 0.7I/WILKINSON

EXIST. LANES: 03 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 34308Z-

PE: 1997 ROW: 1997 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$767,000 $613,600 $153,400

Page 226 of336

STATE TRAN$PORTATION IMPROVEMENT PROGRAM
9/21/00

LAMAR COUNTY
PROJECT: 0000127 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: BARNESVILLE STREETSCAPE PHASE II

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 321370- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles 1 km) 4.2 16.76

DESCRPT: SR 18 SB 13.7c 15.2IMONROE/EB 2.3-3.6IWB 3.38-5.1ITL 5.10-5.6

EXIST. LANES: 02 PROPOSED LANES: 03

ASSOCIATED PROJECTS: 32137X-

OTH Share:
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share: ;

$875,000 $700,000
.$175,000
UNDERWAY $240,000
$2,690,000 $2,152,000
$538,000

PROJECT: 322530- TYPE WORK: NEW CONSTRUCTION

FUND: STP

LENGTH (miles 1 km) 1.9/3.06

DESCRPT: BARNESVILLE BYP [TRUCK BYP] FM SR 7/US 341 N. TO SR I8/US4 I

EXIST. LANES: 00 PROPOSED LANES: 02

PE: 1997 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $220,000
$2,404,000 $1,923,200
$480,800

PROJECT: 33 I820- TYPE WORK: WIDENING

..

.LENGTH (miles / km)

DESCRPT: SR 36 FROM HIGH FALLS RD TO JUST WEST OF 1-75

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 33 182X-

FUND: STP 0:86/ 1.38

PE: 1992 ROW: 2001 CST:

. UNDERWAY $902,000
AFTER 2003

PROJECT: 333220- TYPE WORK: INTERSECTION IMPROVEMENT.

FUND: STP

LENGTH (miles / km) 0.35/0.56

DESCRPT: SR 7IUS 341 AT SR 36ITHOMASTON RD & THOMASTON STREET

LUMP SUM PROJECT

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$359,000 $323,100
$35,900

PROJECT: 343391- TYPE WORK:, REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 36 @ BUCK CREEK 9.5 MI N OF BARNESVILLE

FUND: BRIDGE 0.22/0:35

PE: '1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page 227 of336

---- ,,-------'------_._------------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/0fJ

LANIER COUNTY

PROJECT: 0000310 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles 1 km) 032/0,52

DESCRPT: SR 31/US 221 @ SR 37 & SR II I US 129 EAST OF LAKELAND

EXIST- LANES: 02 PROPOSED LANES: 03

PE: 2003 ROW: LOCL CST:

$360,000 AFTER 2003

PROJECT: 422050- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) I I, I 117.87

DESCRPT: SR 38/US84 FM W/ALAPAI-IA RV TO CR207/DlJPONT/CLlNCH & LOWNDES

EXIST, LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 42205X- 422055-

PE: 1993 ROW: 1999 CST: 2001
GA Share:

UNDERWAY UNDERWAY $16,733,000
$16,733,000

PROJECT: M000345 TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR 37 FM SR II LANIER CO TO SR 38 CLINCH CO LUMP SUM PROJECT

FUND: STP 14.6/23.43

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$1,447,000 $1,157,600
$289,400

Page 228 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00 .

LA URENS COUNTY
PROJECT: 0000427 TYPE WORK: INTERSECTION IMPROVEMEN:r LENGTH (miles! km) .
DESCRPT: SR 3 llUS 44 I AT FIRE TOWER ROAD/CR 337 LUMP SUM PROJECT

FUND:STP 0.3/0.48

PE: 2000 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY ~
$206,000 $185,400
$20,600

PROJECT: 0000542 TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 257 FROM 1-I6 TO INDUSTRIAL BLVD EXIST. LANES: 02 PROPOSED LANES: 04

FUND:STP 2.9/4.67

PE: 2001 ROW: 2001 CST: 2001 FED Share: GA Share:

$42,000 $500,000 $4,250,000 $3,400,000 $850,000

PROJECT: 0000767 TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles / km) 0.4 /0.64

DESCRPT: 1-16 SAFETY UPGRADES@SR26/LAURENS & SR 112/BLECKLEY

PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$4,000,000 $3,600,000 . $400,000

PROJECT: 210950- TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles / km) 0.4 /0.64

DESCRPT: 1-16 SAFETY UPGRADES@ SR 199 IN LAURENS & SR 29 IN TREUTLEN

ASSOCIATED PROJECTS: 21095X-

PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:

PROJECT: 221540- TYPE WORK: PASSING Lr\NES

FUND: STP

LENGTH (miles / km) 0.9/1.45

DESCRPT: SR 19 WB MP MP 29.38/W CL DUDLEY TO WITURKEY CRKlMP 30.73

.EXIST. LANES: 02 PROPOSED LANES; 03

PE: 1997 ROW: 2001 CST: 2001 FED Share: GA Share:

UNDERWAY
$8,600,000 $7,740,000
$860,000

UNDERWAY $5,000
$1,663,000 $1,330,400
$332,600

PROJECT: 23 I430- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miies / km) . 9.8/15.78

DESCRPT: SR 29/US 441 FROM CR 471 TO SR 112/WILKINSON -23143X

EXIST. LANES; 02 PROPOSED LANES; 04

ASSOCIATED PROJECTS: 23143X-

PE: 1993 ROW: 2001 CST:

PROJECT: 232000- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 31/US 319NB MP 31.0-32.41 SB 38.8-3.4/.JOHNSON-23200X EXIST. LANES: 02 PROPOSED LANES: 03 ASSOCIATED PROJECTS: 23200X-

FUND: STP 3 /4.83

PE: 2002 ROW: CST:

PROJECT: 232270- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 26/US 80 @ PUGHES CREEK 2.8 MI SE OF BREWTON

FUND: BRIDGE 0.22/0.35

PE: 1999 ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY $5,360,000 AFTER 2003
$100,000 AFTER 2003 AFTER 2003
UNDERWAY $10,000
$401,000 $320,800
$80,200

Page 229 of336

._------------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

LA URENS COUNTY
PROJECT: 245395- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 19 @ WHITEWATER CREEK 13.2 MI SE OF RENTZ

FUND: BRIDGE 0.22/0.35

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 245396- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 19 @ BIG FLAT CREEK 13 MI SE OF DUBLIN

FUND: BRIDGE 0.22/0.35

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 245397- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 19 @ LITTLE FLAT CREEK 12.5 MI SE OF DUBLIN

FUND: BRIDGE 0.22 10.35

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 245398- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 199 @ PUGHES CREEK 6.9 MI SE OF EAST DUBLIN

FUND: BRIDGE 0.22/0.35

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 262027- TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR 31/US 441 FM CR 272 NORTH TO JUST SOUTH OF 1-16 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 26Y027-

FUND: STATE 7.7/12.40

PROJECT: 262040- TYPE WORK: NEW CONSTRUCTION

FUND: STATE

LENGTH (miles r km) 8.7/14.01

DESCRPT: DUBLIN BYP FM US 441 @.5 MI N OF FIRE TOWER RD NW TO US 441

EXIST. LANES: 00 PROPOSED LANES: 04

PE: 1993 ROW: 2002 CST:

UNDERWAY $3,619,000 AFTER 2003

PE: 1992 ROW: 2001 CST:

UNDERWAY $2,351,000 AFTER 2003

PROJECT: 262064- TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR 31IUS 441 FROM SR 46 NORTH TO CR 272 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 26Y064-

FUND: STATE 8.82/14.20

PROJECT: 26206X- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 010.00

DESCRPT: SR 31/US 441 FM N/CR 132 THRU DODGE TO SR 46/..WHEELER

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 262061-

PE: 1993 ROW: 2002 CST:

UNDERWAY $3,000,000 AFTER 2003

PE:NONE ROW.' NONE CST: NONE

Page 230 of336

.-------------,--,-------_._--
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

LA URENS COUNTY

PROJECT: 262570- TYPE WORK: REALIGNMENT

FUND: STP

LENGTH (miles / km) 0.3 /0.48

DESCRPT: RELOCATE SR 257 ALONG JOINER ST/CS 702 IN DUBLINIINCL CLVT

PE: 1996 ROW: 1999 CST: 2001 FED Share: GA Share:

L!NDERWAY UNDERWAY
$752,000 $601,600 $150,400

PROJECT: 271000- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 3.42/5.51

DESCRPT: NATHANIEL DRIVE FROM SR 26 TO SR 1991N EAST DUBLIN

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1994 ROW: LOCL CST: 2001
GA Share:

UNDERWAY $5,623,000 $5,623,000

PROJECT: 271294- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: CITY OF DUBLIN MULTI-USE PATHS

FUND:STP 0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

$1,089,000 $871,000
$218,000

Page 231 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

LEE COUNTY
PROJECT: 0000666 TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: EAST-WEST CONN IN LEESBURG @NS #TEMPI77 . LUMP SUM PROJECT

FUND: STP 0/0.00

PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$100,000 $80,000 $20,000

PROJECT: 431730- TYPE WORK: WIDENING

FUND: STP

ALBANY TIP # H/R-99-5

LENGTH (miles / km) 5.94/9.56

DESCRPT: SR 91/PHILEMA RD FM CR 51GRAVES SPGS RD NE TO SR 32

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2000 ROW: 2002 CST:

UNDERWAY $1,300,000 AFTER 2003

PROJECT: 432090- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

ALBANY TIP # BR-I

LENGTH (miles / km) 0.27/0.43

DESCRPT: SR 32 @ MUCKALEE CREEK APP 2.5 MI E OF LEESBURG

PE: 2001 ROW: 2003 CST:

$25,000 $10,000 AFTER 2003

PROJECT: 432091- TYPE WORK: REPLACE BRIDGE .

FUND: BRIDGE

ALBANY TIP # BR-2

LENGTH (miles / km) 0.22/0.35

DESCRPT: SR 32 AT FLINT RIVER OVERFLOW 0.45 MILE FM WORTH CO LINE

PE: 2001 ROW: 2003 CST:

$20,000 $10,000 AFTER 2003

PROJECT: 432092- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

ALBANY TIP #

LENGTH (miles / km) 0.36/0.58

DESCRPT: SR 32 @ FLINT RIVER APP 9 MI E OF LEESBURG

PE: 2001 ROW: CST:

$158,000 AFTER 2003 AFTER 2003

PROJECT: 462395- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 9.3/14.97

DESCRPT: SR 3/US 19 FM NORTH OF CR 151 NW TO SUMTER CL @ SMITHVILLE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 46Y395-

PE: 1992 ROW: 2002 CST:

UNDERWAY $1,723,000 AFTER 2003

PROJECT: M000482 TYPE WORK: BRIDGES LENGTH (miles / km)
DESCRPT: BRIDGE REHAB @ I LOC IN LEE CO LUMP SUM PROJECT

FUND: STP 0/0.00

PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$100,000 $80,000 $20,000

Page 232 of336

, - - - - - - - - - - - - - ------,_. STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00'

LIBERTY COUNTY
PROJECT: 0000455 TYPE WORK:
DESCRPT: SR 38!US 84 AT SR J96

INTERSECTION IMPROVEMENT LENGTH (miles I km)

FUND: NHS 0.83 11.34

PE: 2000 ROW: 2002 CST: 2002 FEDS1lare: GA Share:

UNDERWAY $790,000 , $508,000 $406,400 $101,600

PROJECT: 5.11140- TYPE WORK: WIDENING

FUND: 1M

LENGTH (miles I km) 13.3/21.41

DESCRPT: 1-95 FM MCINTOSH CO LINE TO SOUTH OF JERICO RIVER

EXIST, LANES: 04 PROPOSED LANES: 06

PE: 1993 ROW: 2001 CST:

UNDERWAY $53,000
AFTER 2003

PROJECT: 511142- TYPE WORK: BRIDGE REHAB

FUND:NHS

LENGTH (miles I km) 0.4 10,64

DESCRPT: 1-95 AT SOUTH AND NORTH NEWPORT RIVERS & MCINTOSH COUNTY

EXIST. LANES: 04 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 51114X-

PE: 1993 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$10,450,000 $8,360,000 $2,090,000

PROJECT: 511152- TYPE WORK: BRIDGE REHAB LENGTH (miles I km)
DESCRPT: 1-95 @ JERICO RIVER"L1BERTY/BRYAN EXIST, LANES: 04 PROPOSED LANES: 08

FUND:NHS 0.0510.08

PE: 1993 ROW: NONE
CST: 2001 FED Share:
GA Share:

UNDERWAY
$5,236,000 $4,188,800 $1,047,200

PROJECT: 520781- TYPE WORK: WIDE.NING

FUND: STP

LENGTH (miles I km) , 8,85 /14.25

DESCRPT: SR 196 FM US84/SR 38 TO SR 25/US 17 SW OF 1-95

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 2001 CST:

UNDERWAY , $2,461,000
AFTER 2003

PROJECT: 521190- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 196/@BAKER SWAMP StOUGH EXIST. LANES: 02 PROPOSED LANES: 05

FUND: BRIDGE 0.32 10.52

PE: 1984 ROW: 1987

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY
$574,000 $459,200 $114,800

PROJECT: 53260X- 'TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles/km) 0/0.00

DESCRPT: SR 144 PASSING LANES THROUGH FORT STEWAR ISEE LONG-532600

ASSOCIATED PROJECTS: 532600-

PROJECT: 550600- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: FRANK COCHRAN DRIVE FM SR 119 TO HERO ROAD EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 2.7/4.35

PE:NONE ROW: NONE CST: NONE

PE: 2003 ROW: LOCL CST:

$338,000 AFTER 2003

Page 233 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

LIBERTY COUNTY

PROJECT: M000344 TYPE WORK: SHOULDER WORK

FUND: STP

LENGTH (miles / km) 11.7 / 18.89

DESCRPT: SR 144 FM TRINITY RD LIBERTY CO TO W OF SR 405/1-95 BRYAN CO

LUMP SUM PROJECT

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$899,000 $719,200 $179,800

Page 234 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

LINCOLN COUNTY
PROJECT: 0000153 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: DOWNTOWN LINCOLNTON STREETSCAPE

FUND:STP 0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 231360- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 2.71/4.36

DESCRPT: SR 47 FM SR 43 CONN TO .5 NW OF CR 80 - TWO PASSING LANES

EXIST. LANES: 02 PROPOSED LANES: 03

OTH Share:
PE: 1997 ROW: 2001 CST:

$188,000 $150,000
$38,000
UNDERWAY $105,000
AFTER 2003

PROJECT: 231920- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 43/47 TRAFFIC IMPROVEMENTS IN LINCOLNTON EXIST. LANES: 02 PROPOSED LANES: 03 .

FUND:STP. 213.22

PE: 2001 ROW: CST:

$74,000 AFTER 2003 AFTER 2003

Page 235 of336
I

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_.<._,. -...._ _. ,. _. . \'lOl_ _
_w<.,,.._,,",.'~'~_.

_ _ .,.

9/21/00

. _......_ _

_ _ _ _....... _ ' "

-.-.._~

LONG COUNTY

PROJECT: 0000431 TYPE WORK: WATER POLLUTION MITIG.

FUND: STP

LENGTH (miles I km) 0/0.00

DESCRPT: WETLAND MITIGATION @ PARCEL 2 GDOT SITE IN LONG CO

LUMP SUM PROJECT

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

......

_

$3,142,000 $2,513,600
$628,400

PROJECT: 532600- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles I km) 5 /8.05

DESCRPT: SR 144 PASSING LANES THROUGH FT STEWART/BRYAN-LIBERTY/53260X

EXIST. LANES: 02 PROPOSED LANES: 03

ASSOCIATED PROJECTS: 53260X-

PE: 2003 ROW: CST:

$110,000 AFTER 2003 AFTER 2003

Page 236 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

LOWNDES COUNTY
PROJECT: 0000083 TYPE WORK: BICYCLE/PED. FACILITY LENGTH, (miles / km)
DESCRPT: VALDOSTA MULTI-USE TRAIL

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Shure:

OTH Share:

PROJECT: 0000684 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km): 0.2 J /0.34

DESCRPT: CS I 191/TUCKER ROAD @ DUKES BAY CANAL IN SOUTH VALDOSTA

PE: 2001 ROW: LOCL CST:

$949,000 $759,000
$190,000 $20,000
AFTER 2003

PROJECT: 410500- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 13.4 /21.57

DSCRPT: 1-75 FM NORTH OF SR 133 TO COO~ COUNTY LINE - PHASE I

EXIST. LANES: 04 PROPOSED LANES: 06

PE: 1993 ROW: 2001 CST: 2001 FED Share: GA Share:

UNDERWAY $250,000
$47,781,000 $38,224,800 $9,556,200

PROJECT: 42205Z- TYPE WORK: WIDENING LENGTH (miles / km)

FUND: STATE 0 /0.00

DESCRPT: SR 38/US84 FM W/ALAPAHA RV TO CR 207 IN DUPONT/SEE LANIER CO

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 422050-

PROJECT: 422710- TYPE WORK: BRIDGES

FUND: STP

LENGTH (miles / km) 0.5 /0.8 I

DESCRPT: SR 38/US 84/W HILL AVE GRADE SEPARATION AT NORFOLK SOU RR

PE:NONE ROW: NONE CST: NONE

PE: 2001 ROW: 2003 CST:

$1,500,000 $2,400,000 AFTER 2003

PROJECT: 431680- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.66/1.06

DESCRPT: SR 7/US 4 I AT CR 570 AND CR 868/HAHIRA RD

PE: 1997 ROW: 2001 CST: 2001 FED Share: .GA Share:

UNDERWAY $25,000
$1,797,000 $1,617,300
$179,700

PROJECT: 432100- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.33 /0.53

DESCRPT: SR 31 @ WITHLACOOCHEE RIVER JUST NORTH OF GA-FLA STATE LINE

PE:2001 ROW: CST:

$56,000 AFTER 2003 AFTER 2003

PROJECT: 442780- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.37 /0.60

PE: 1997 ROW: LOCL

DESCRPT: CR 777/CAT CREEK ROAD@ CAT CREEK OVERFLOW SW OF BARRETTS

CST: 2001

FEDShllre:

GA Share:

UNDERWAY
$713,000 $570,400 $142,600

Page 237 of 336

._._-._---

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

LOWNDES COUNTY

PROJECT: 442790- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles / km) 0.37/0.60

ROW: LOCL

DESCRPT: CR,777/CAT CREEK ROAD@CAT CREEK APP 3 MI SW OF BARRETTS

CST: 2001

FED Share:

GA Share:

'>

PROJECT: 442960- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.3 I /0.50

DESCRPT: SR 122 @ WITHLACOOCHEE RIVER APP 4.5 MI E OF HAHIRA

PE: 1999 ROW: 2003 CST:

UNDERWAY
$582,000 $465,600 $116,400
UNDERWAY $10,000
AFTER 2003

PROJECT: 442961- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.25/0.40

DESCRPT: SR 122 @ CAT CREEK APP 9 MI E OF HAHIRA

PE:2000 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page 238 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

LUMPKIN COUNTY
PROJECT: 0000141 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: DAHLONEGA STREETSCAPES

FUND: STP 0/0.00

PE: LOCL ROW: LOCL' CST: 2001 '. FED Share:

OTH Share:

PROJECT: 0000307 TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 52@ETOWAHRIVER4.5MI W OF DAHLONEGA

FUND: BRIDGE 0.23/0.37

PE: 2002 ROW: CST:

$250,000 $200,000
$50,000
$54,000 AFTER 2003 AFTER 2003

PROJECT: 0000565 TYPE WORK: REPLACE BRIDGE

FUND: STP

LENGTH (miles / km) 0.22/0.35

DESCRPT: AURARIA ROAD/CR 226 OVER CROOKED CREEK SE OF DAHLONEGA

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

Page 239 of336

--_._-----_._--
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

MACON COUNTY
PROJECT: 322285- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 90 @ CSX RR SOUTH OF IDEAL NEAR CR 57

FUND: BRIDGE

PE: 1992

0.2/0.32

ROW: NONE

CST: 2003

FED Share:

GA Share:

UNDERWAY
$1,200,000 $960,000 $240,000

PROJECT: 332300- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles / km) 0.24 / O. 39

ROW: 2001

DESCRPT: SR 49/0GLETHORPE ROAD @ FLINT RIVER OVERFLOW WEST MONTEZUMA

CST: 2001

FED Share:

GA Share:

UNDERWAY $6.000
$1,072,000 $857,600 $214,400

PROJECT: 333070- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: SR 127 @SR 1281 SR 128 CfJ} SR 901 SR 224@SR 26 & SIGNING

PE: 1999 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $10,000
$292,000 $233,600
$58,400

PROJECT: 343340- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 240 @ BUCK CREEK APP 5 MI S OF IDEAL

FUND: BRlDGE

PE: 1999

0.27/0.43

ROW: 2001

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$1,250,000 . $1,000,000
$250,000

PROJECT: 343350- TYPE WORK: REPLACE BRIDGE LENGTH (miles/km)
DESCRPT: SR 329 @ HOGCRAWL CREEK NEAR DOOL Y CO LINE

FUND: BRIDGE

PE: 2001

0.23/0.37

ROW: 2002

CST: 2003

FED Share:

GA Share:

$20,000 $10,000 $750,000 $600,000 $150,000

PROJECT: M000340 TYPE WORK: SHOULDER WORK

FUND: STP

LENGTH (miles I km) 16.7/26.84

DESCRPT: SR 26 FM STAGECOACH RD MACON CO TO SR 7 HOUSTON CO

LUMP SUM PROJECT

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$1,739,000 $i,391,200
$347,800

Page 240 of 336

STATE TRANSPORTATIONIMPROVEMENT PROGRAM
9/21/00

MADISON COUNTY

PROJECT: 122180- TYPE WORK: WIDENING

FUND: STP

.

LENGTH (miles / km) 6.5 / 10.47

DESCRPT: SR 8 FM CR 228 @ DIAMOND HILL TO CR 88IIRWIN KIRK ROAD &CL VT

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJI;:CTS: 122185-

PE: 1992 ROW: 2001 CST:

UNDERWAY $1,986,000 AFTER 2003

PROJECT: 122190- TYPE WORK: WIDENING

FUND:.STP

, LENGTH (miles / km) 4.3 /6.92

DESCRPT: SR 8/US 2.9 FM SR,106 TO CR 228 @ DIAMOND HILLIINCL CLVT

EXIST. LANES: 02 PROPOSED LANES: 04

p,E:1992 ROW: 2001 CST:

UNDERWAY $1,834,000 AFTER 2003

. PROJECT: 12Y100- TYPE WORK:', .WIDENING

FUND:NHS

LENGTH (miles / km)

0/0.00

DESCRPT: SR'72 FM SR 172 E TO W CITY LIMITS/COMER- FqR FED PEl 122100

. EXIST. LANES: 02 PROPOSED LANES: 05

ASSOCIATED PROJECTS: 122100-

PE:2001 ROW: NONE eST: NONE

$1,000

PROJECT: 12Y65Q- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km)

0/0.00

'DESCRPT: SR 72 FM WCL OF COMER TO BROAD RVRlELBERT -FOR FED PE/122650,

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 122650-

PE: 2001 ROW: NONE eST:'NONE

$1,000

'. PROJEcT: 132400- TYPE WORK: PASSING LANES

.

FUND: STP

LENGTH (miles / km) 1.2/1.93

PE: 1996 ROW: 2001

DESCRPT: SR 106 M.P. 1.35 N. OF SR 106 TO MP 2.55 N OF CR In

CST: 2003

EXIST. LANES: 02 PROPOSED LANES: 03

FED Share:

GA Share:

UNDERWAY $77,000
$1,081,000 $864,800 $216,200'

PROJECT: 170787- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE:2000

..

LENGTH ("dIes / km) 0.2 /0.32

ROW: LOCL

.DESCRPT: CR 221IMCCARTY-DODD ROAD@BRUSH CREEK 2.2 MI NE OF COLBERT

eST: 2003

FED Share:

GA Share:

UNDERWAY
$288,000 $230,400
$57,600

Page 241 of336

_ _,....

STATE TRANSPORTATION IMPROVEMENT PROGRAM

...._ _ ~_"'."" ...-.._-"'....._._~

9/21/00

....._ " " " _ _ _ _"" x,_"".....,.."_.,,.._~

~

. ....,...,.."'_..". ""'""''''_X_<'"'_._......._ ,._x-......,._~,

"'_<>.<-""'<_,_"'~~,.,.,.,,,,"'

MARION COUNTY

PROJECT: 332280- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1998

LENGTH (miles / km) 0.21 /0.34

ROW: 2001

DESCRPT: SR 41/BROAD STREET @ CEN. OF GA. RAILROAD IN BUENA VISTA

CST: 2002

FED Share:

GA Share:

UNDERWAY $333,000 $938,000 $750,400 $187,600

PROJECT: 343010- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles / km) 0.23/0.37

ROW: 2001

DESCRPT: SR 355 OVER JUNIPER CREEK AT TALBOT COUNTY LINE

CST: 2001

FED Share:

GA Share:

UNDERWAY $57,000
$1,127,000 $901,600 $225,400

PROJECT: 343355- TYPE WORK: REPLACE BRIDGE , LENGTH (miles / km)
DESCRPT: SR 137 @ OOCHEE CREEK 2.5 MI E OF JCT SR 41

FUND: BRIDGE

PE: 1999

0.22 /0.35

ROW: 2001

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$313,000 $250,400
$62,600

PROJECT: 343356- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 137 @BUCK CREEK.7 MI W OF JCT SR 240

FUND: BRIDGE

PE: 1999

0.23/0.37

ROW: 2002

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$438,000 $350,400 $87,600

Page 242 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
. 9/21/00

MCDUFFIE COUNTY

PROJECT: 222255- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 10.3 /16.57

DESCRPT: SR 17/10 FM CR 6/SMITH MILL RDTO WASHINGTON BYPASS/WILKES

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 22225X- 22Y255-

PE: 1994 ROW: 2003 CST:

UNDERWAY $3,005,000 AFTER 2003

.PROJECT: 227815- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

LEJYGTH (miles I km) 0.23 /0.37

DESCRPT: SR 10/U.S 78 @HARTCREEK 9.5 MI N OF' THOMSON

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

pROJECT: 227816-TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

. LENGTH (miles / km) 0.24 /0.39

DESCRPT: SR IO/US 78 @ BIG CREEK 8 MI N OF THOMSON

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 22Y250- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 0 /0.00

DESCRPT: SR 1711 0 FM SR 43 TO CR 6/SMITH MILL RD - FOR FED PE; 222250

EXIST. LANES: 02 PROPOSED LANES: 05

. ASSOCIATED PROJECTS: 222250-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 232320- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.23 /0.37

DESCRPT: SR 47/US 221 @ HEADSTALL CREEK 5.3 MI S OF DEARING

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 262400- TYPE WORK: NEW CONSTRUCTION

FUND: STATE

LENGTH (miles/ km) 7.5/12.08

DESCRPT: THOMSON BYP/ FM SR 17 @ CR 311 NE NEW LOC TO SR 17 @ CR 20

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIA TED PROJECTS: 26Y400-

PE: 1993 ROW: 1994 CST: 2001
GA Share:

UNDERWAY UNDERWAY $17,068,000
$17,068,000

PROJECT: 26Y400- TYPE WORK:. NEW CONSTRUCTION

FUND:NHS

LENGTH (miles / km) 0 /0.00

DESCRPT: THOMSON BYP/SR IO/US 78 PART OVER 1-20 TO CR 26/DALLAS DR

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 262400-

PE:2001 ROW: NONE CST: NONE

$1,000

Page 243 of336

_ _ _ _ _.:ool:O_.

STATE TRANSPORTATION IMPROVEMENT PROGRAM

.

.~.

9/21/00 .."'~._'...

_ ..

..'\'....... """".".~"

JI>'.. l!IIIIU..

" " _ ,_ _

MCINTOSH COUNTY

PROJECT: 511110- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles I km): 4.21 16.78

DESCRPT: 1-95 FM ALTAMAHA RIVER @ GLYNN CL TO I-MILE NORTH OF SR 251

EXIST. LANES: 02 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 5 I II 12-

PE: 1993 ROW: 2002 CST:

UNDERWAY $17,000
AFTER 2003

PROJECT: 511120- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: 1-95 FM I-MILE NORTH OF SR 251 TO SR 57 -- PHASE 1 EXIST. LANES: 04 PROPOSED LANES: 06

FUND:NHS 8.4 /13.52

PE: 1993 ROW: 2001 CST:

UNDERWAY $11,000
AFTER 2003.

PROJECT: 51114X- TYPE WORK: BRIDGE REHAB

FUND: NHS

LENGTH (miles I km)

010.00

DESCRPT: 1-95 AT SOUTH & NORTH NEWPORT RIVERS IMCINTOSH COUNTY

ASSOCIATED PROJECTS: 511142-

PE:NONE ROW: NONE CST: NONE

Page 244 of336

STATE TRANSPORTA-TIONIMPROVEMENT PROGRAM
9/21/00

MERIWETHER COUNTY
PROJECT: 332800- TYPE WORK: PASSING LANES LENGTH (miles 1 km)
DESCRPT: SR 18174/109 AT FIVE LOCATIONS/UPSON - 33280X EXIST. LANES: 02 PROPOSED LANES: 03 ASSOCIATED PROJECTS: 33280X-

'FUND: STP 6.99/11.25

PE: 1999 ROW: 2002 CST:

UNDERWAY $138,000
AFTER 2003

PROJECT: 333180- TYPE WORK: REPLACE BRIDGE LENGTH (mites r km)
DESCRPT: SR 85 - SR 74 @PAPPYS CREEK.5 MI N OF WOODBURY

' FUND: BRIDGE

PE: 1999

0.21/0.34

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY . $10,000 $270,000 $216,000 $54,000

PROJECT: 333181- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles 1 km) 0.26 10.42

ROW: 2001

DESCRPT: SR 85 - SR 74 @ RED OAK CREEK 3.5 MI N OF WOODBURY

CST: 2002.

FED Share:

GA Share:

UNDERWAY $10,000
$859,000 . $687,200
$171,800

PROJECT: 333182- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles 1 km) 0.26 10.42 .

ROW: 2001

DESCRPT: SR 85 - SR 74 @ WI-liTE OAK CREEK .4 MJ N OF ALVATON

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$870,000 $696,000 $174,000

PROJECT: 333183-. TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 85 ALT @ CSX RAILROAD IN WARMSPRINGS

FUND: BRIDGE

PE: 1999

0.22 10.35

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$386,000 $308,800
$77,200

PROJECT: 333184- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

.

LENGTH (miles 1 km) 0.22/0.35

DESCRPT: SR 85 ALT @ POUND CREEK 2 MI S OF WOODBURY

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
. AFTER 2003

PROJECT: 333200- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 85 @ CANE CREEK 1.7 MI S OF WOODBURY

. FUND: BRIDGE 0.24 10.39

PE: 1999 ROW: 2001 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 333201- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles 1 km) 0.27 10.43

DESCRPT: SR 85 @ CSX RAILROAD IN WOODBURY

PE: 2001 ROW: CST:

$40,000 AFTER 2003 AFTER 2003

Page 245 of336

_ _ _ _.

.:...-C-_-...:._ _- ' -

_

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

MER1WETHER COUNTY

PROJECT: 333202- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

i LENGTH (miles km) 0.21 10.34

PE: 1999 ROW: 2001

DESCRPT: SR 18/US 27 ALT. @ KENDALL CREEK 2 MI S OF GREENVILLE

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$270,000 $216,000 $54,000

PROJECT: 363850- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles I km) 0.25 10.40

DESCRPT: WARM SPRINGS SOUTH BYPASS/E ST/SR 976 FM SR 85W TO SR 41

EXIST. LANES: 02 PROPOSED LANES: 04

PE.'NONE ROW: 2001 CST: 2002
GA Share:

$131,000 $175,000
$175,000

Page 246 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

MILLER COUNTY

.. PROJECT: 422210- .: TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 9.3 /14.97

DESCRPT: SR IIUS 27 FR W CL @COLQUITTTOCR 279/DAMASCUS-HILTON RD

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 422215- 42Y210-

PE: 1993 ROW: 2002 CST:

UNDERWAY $2,857,000 AFTER 2003

PROJECT: 432140- TYPE WORK: REPLACE BRIDGE . LENGTH (miles / km)
DESCRPT: SR 91 @ AYCOCK CREEK APP 4 MI S OF COLQUITT

FUND: BRIDGE 0.24 /0.39

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 432 I41- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.23 /0.37

DESCRPT: SR 91 @ CYPRESS CREEK 2.5 MI W OF COLQUITT

PE: 1999 ROW~2003
CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 471434- TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: CITY OF COLQUITT STREETSCAPE

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

$236,000 $189,000
$47,000

Page 247 of336

--------------,----
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

MITCHELL COUNTY

PROJECT: 422690- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

LENGTH (miles / km) 0.22 /0.35

PE: 1999 ROW: 2002

DESCRPT: SR 3/US 19- SR 300 SBL @ WETHINGTON SLOUGH S OF BACONTON

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$499,000 $399,200
$99,800

PROJECT: 422691- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.22 /0.35

ROW: 2002

DESCRPT: SR 3/US 19~ SR 300 SBL @ RACCOON CRK SOUTH OF BACONTON

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$589,000 $471,200 $117,800

PROJECT: 43115X- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0/0.00

DESCRPT: CR 299 @ BIG CREEK APPROX 3 MI E OF JCT SR III ITHOMAS CO

ASSOCIATED PROJECTS: 431150-

PE:NONE ROW: NONE CST: NONE

PROJECT: 43115Z- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0/0.00

DESCRPT: CR 299 @ LITTLE CREEK APPROX 3 MI E OF JCT SR 111 ITHOMAS

PE:NONE ROW: NONE CST: NONE

~

ASSOCIATED PROJECTS: 431 152-

PROJECT: 442740- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles / km) 0.51 /0.82

ROW: LOCL

DESCRPT: CR 307 AT BIG SLOUGH AND OVERFLOW IN NORTH CAMILLA

CST: 2003

FED Share:

GA Share:

UNDERWAY
$783,000 $626,400 $156,600

PROJECT: 442975- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 93 @ LOST CREEK APP 1.5 MI N OF COTTON

FUND: BRIDGE 0.23 /0.37

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 442976- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.22 /0.35

, DESCRPT: SR 93 @ SPENCE MILL CREEK .2 MI N OF GRADY CO LINE

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
. AFTER 2003

PROJECT: M000338 TYPE WORK: SHOULDER WORK LENGTH (miles / km)
DESCRPT: SR 112 FM GRADY CO LN TO WORTH CO LN LUMP SUM PROJECT

FUND: STP 28.5 /45.82

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$1,451,000 $1,160,800
$290,200

Page 248 of336

..

-
_ _ _ _ _ _ _ _ ......

N

J

STATE TRANSPORTATION IMPROVEMENT PROGRAM

. .. _-""~_~~_,

~_.t

.....,..,_._. 9/21/00 .~

U _ _.. _ _M .......,_""""

"''''''_ _~ ... _ _'''''''. _ _ '''t,..,..,..,. _ _, ,..._.:,:_.....~

." ...,.......<...-""_"""_.~,

MONROE COUNTY

PROJECT: 0000685 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.2 /0.32

DESCRPT: CR 59/REEDY CREEK ROAD @ TOBESOFKEE CREEK TRIB.

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 0000686 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.21 /0.34

DESCRPT: CR 59lREEDY CREEK ROAD @ TOBESOFKEE CREEK 5 MI S OF FORSYTH

PE: 2001 ROW: LOCL CST:

$22,000 AFTER 2003

PROJECT: 311740- TYPE WORK: ~RIDGE REHAB

FUND: 1M

LENGTH (miles / km) 0.25 /0.40

DESCRPT: 1-475/SR 408 NBL @ 1-751 ADD ONE LANE & REPLA BRIDGE DECK

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1994 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $50,000
$4,000,000 $3,600,000
$400,000

PROJECT: 32137X- TYPE WORK:, PASSING LANES

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: SR 18 BTWN BARNESVILLE & FORSYTH/PASSING & TL...SEE LAMAR CO

ASSOCIATED PROJECTS: 321370-

PE:NONE ROW: NONE CST: NONE

PROJECT: 342920- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 19 PASSING LANES SB FM MP 8.196 TO MP 6.319 EXIST. LANES: 02 PROPOSED LANES: 03

FUND:STP 1.88/3.03

PE: 2003 ROW: CST:

$100,000 AFTER 2003 AFTER 2003

PROJECT: 343167- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 42 @ ECHECONNEE CREEK 6 MI E OF CULLODEN

FUND: BRIDGE 0.23 / 0~37

PE: 1999 ROW: 2002

CST: 2003

FED Share:

GA Share:

UNDERWAY $50,000
$610,000 $488,000 $122,000

PROJECT: 370813- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

,LENGrH (miles / km) 0.4/0.64

ROW: LOCL

DESCRPT: CR I58/ROCKY CREEK ROAD@LITTLE TOWALIGA RIVER W OF 1-75

CST: 2002

FED Share:

GA Share:

UNDERWAY
$228,000 $182,400
$45,600

PROJECT: M000416 TYPE WORK: BRIDGES

FpND: 1M

.

LENGTH (miles / km) 0/0.00

DESCRPT: 1-75 OVER LITTLE TOWALIGA RVIDECK OVERLAYIPE ONLY

LUMP SUM PROJECT

PE: 2001 ROW: NONE CST: NONE

$50,000

, Page 249 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

MONROE COUNTY
PROJECT: M000458 TYPE WORK: ACCELERATION / DECEL LANE LENGTH (miles / km)
DESCRPT: SR 401/1-75 FM MP 190 TO MP 191 LUMP SUM PROJECT

FUND:NHS I /1.61

PE: 2001 ROW: NONE CST: NONE

$160,000

Page 250 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

-MONTGOMER Y COUNTY

. PROJECT: 522520- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles 1 km) 2.4 13.86

DESCRPT: SR 15 BTWN HIGGSTON & TARRYTOWN/NB MP 5.0-6.4ISB 8.7-9.7/

EXIST. LANES: 02 PROPOSED LANES: 03

PE:1995 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $5,000
$1,057,000 $845,600 $2/1,400

PROJECT: 532330- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles 1 km) 0.24/0.39

ROW: LOCL

DESCRPT:. CR 16.9/THOMPSON POND ROAD@TlGERCREEK 4 MI SE OF TARRYTOWN

CST: 2002

FED Share:

GA Share:

UNDERWAY
$546,000 $436,800 $109,200

PRO./.ECT: 5424 10- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (mileslkm) 0.22/0.35
DESCRPT: SR 56 @ MILLIGAN CREEK IN CITY LIMITS or UVALDA

PE: 1999 ROW: 2002 CST:

UNDERWAY $/0,000
AFTER 2003

PROJECT: 550610- TYPE WORK: TURN LANES

FUND: STP

LENGTH (miles 1 km) 0.65 1 1.05

DESCRPT: SR 292/VIDALIA FM MORN'SIDE - LOWERY WIRIGT ON WILSON

ASSOCIATED PROJECTS: 5506IX-

PE: 1995 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $500,000
$2,000,000 $/,600,000
$400,000

PROJECT: 570760- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: CR 12 @TlGER CREEK 3 MI SE OF TARRYTOWN

FUND: BRIDGE

PE: 200/

0.22/0.35

ROW: LOCL

CST: 2002

FED Share:

GA Share:

$20,000
$4/8,000 $334,400
$83,600

PROJECT: 57/455- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: CR / @ TIGER CREEK I MI E OF TARRYTOWN

FUND: BRIDGE

PE: /999

0.22/0.35

ROW: LOCL

CST: 2003

FED Share:

GA Share:

UNDERWAY
$421,000 $336,800
$84,200

Page 251 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

- - _ .__. _ - - - - - _ _ _ _... .... =_.".,"'''',._*~_..._.

_._.~

:_ _ ...... >_><n,..._.,~,....,....'''''''_.,.._".,,.,;'',.'...-...._

_

MORGAN COUNTY

PROJECT: 0000472 TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles / km) . 0.6/0.97

DESCRPT: 1-20 SAFETY UPGRADES @ SR 24; BUCKHEAD RD & SR 44/GREENE; X

ASSOCIATED PROJECTS: 00004X2

PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$11,400,000 $10,260,000
$1,140,000

PROJECT: 0001222 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.36/0.58

DESCRPT: SR 24/ATHENS HIGHWAY @ HARD LABOR CREEK & BIG SANDY CREEK

PE: 2002 ROW: CST:

$120,000 AFTER 2003 AFTER 2003

PROJECT: 210920- TYPE WORK: INTERCHANGE LENGTH (miles I km)
DESCRPT: 1-20 SAFETY UPGRADES @ NEWBORN RD AND SR 83

FUND: 1M 0.4 /0.64

PE: 1998 ROW: NONE CST: 2001 FED Share: GA SIMre:

UNDERWAY
$7,600,000 $6,840,000
$760,000

PROJECT: 245285- TYPE WORK: REPLACE BRIDGE.

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.21 /0.34

ROW: LOCL

DESCRPT: CR 251/SEVEN ISLAND ROAD @ SUGAR CREEK 1.8 MI S OF BUCKHEAD

CST: 2001

FED Share:

GA Share:

UNDERWAY
$568,000 $454,400 $113,600

Page 252 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

MURRA Y COUNTY

PROJECT: 0000687 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.22/0.35

DESCRPT: CR 4IDENNIS MILL ROAD@ ROCK CREEK 5.6 MI SE OF CHATSWORTH

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 620399- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 52 @ CSX RR IN CHATSWORTH

FUND: BRIDGE

PE: 1996

0.17 /0.27

ROW: 1996

CST: 2001.

FED Share:

GA Share:

UNDERWAY UNDERWAY
$1,732,000 $1,385,600
$346,400

PROJECT: 621260- TYPE WORK: REALIGNMENT LENGTH (miles / km)
DESCRPT: SR 282 RELOCATION FM SR 61IUS 411 E TO CR 309 EXIST. LANES: 00 PROPOSED LANES: 02

FUND: STP 1.2 / 1.93

PE: 1992 ROW: 2002 CST:

UNDERWAY $51,000
AFTER 2003

PROJECT: 631550- TYPE WORK: WIDENING

FUND: STP

.LENGTH (miles / km) 4 /6.44

DESCRPT: SR 225/SPRING PLACE BYP - NEW HOPE RD TO SR 225 S OF MILL CK

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 2002 CST:

UNDERWAY . $2,856,000 AFTER 2003

PROJECT: 642370- TYPE WORK: BRIDGES

FUND: STP

LENGTH (miles / km) 0.15 /0.24

DESCRPT: CR 19!OLD FEDERAL ROAD GRADE SEPARAT!ON AT CSX RAILROAD

PE: 2000 ROW: LOCL CST: 2002 FED Share: GA Share:

. UNDERWAY
$800,000 $720,000 $80,000

PROJECT: 642410- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 282 @ ROCK CREEK 5.3 MI S OF CHATSWORTH

FUND: BRlDGE 0.22/0.35

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 671212- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: MURRAY COUNTY BIKE LANES PHASE I

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 671230- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) 0.23/0.37
DESCRPT: RELOCATE CR 231 CONSTRUCT A CANOEIKA YAK RAMP & PARKING AREA

PE: 2001 ROW: 2003 CST: 2003 FED Share: GA Share:

$233,000 $186,000
$47,000
$50,000 $10,000 $527,000 $421,600 $105,400

Page 253 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

MUSCOGEE COUNTY

PROJECT: 0000099 TYPE WORK: 'BICYCLE/PED. FACILITY

COLUMBUS TMA TIP # WSTRIAL-2000

LENGTH (miles / km)

DESCRPT: WARM SPRINGS RAIL LINE BIKE/PED TRAIL

FUND: STP 12/19.32

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 0000342 TYPE WORK: MINOR WIDEN & RESURF

FUND: NHS

COLUMBUS TMA TIP #

LENGTH (miles / km) 1.31 /2.11

DESCRPT: MACON RD/SR 22SP FM UNIVERSITY AVE/CS 959 TO REESE RD/CS2111

PE: 2001 ROW: CST:

$1,250,000 $1,000,000
$250,000
$100,000 AFTER 2003 AFTER 2003

PROJECT: 0000343 TYPE WORK: INTERSECTION IMPROVEMENT

COLUMBUS TMA TIP # ST-LR-32

LENGTH (miles / km)

DESCRPT: RIVER RD/SR 219 AT 54TH STREET/CS 1425 IN COLUMBUS

FUND: STP 0/0.00

PE: 2001 ROW: CST:

$10,000 AFTER 2003 AFTER 2003

PROJECT: 311445- TYPE WORK: WIDENING

FUND:NHS

PE: 1992

UNDERWAY

COLUMBUS TMA TIP # 91-ST-2001

LENGTH (miles/ km) 2.83/4.56

ROW: 2001

$319,000

DESCRPT: I-I 85/COLUMBUS FM SR 520 TO ST MARYS ROAD

CST: 2003

$13,966,000 .

EXIST. LANES: 04 PROPOSED LANES: 06

FED Share:

$11,172,800

ASSOCIA TED PROJECTS: 3 I 1630-
0.

GA Share:

$2,793,200

PROJECT: 311630- TYPE WORK: INTERCHANGE

COLUMBUSTMA TIP # 91-ST-2001

LENGTH (miles / km)

DESCRPT: 1-185 INTERCHANGE AT SR I/SR 520

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 311445-

FUND: 1M 1.61/2.59

PE: 1994 ROW: 2001 CST:

UNDERWAY $2,107,000 AFTER 2003

PROJECT: 321810- TYPE WORK: BRIDGE REHAB

FUND:NHS

COLUMBUS TMA TIP # 86-UD-3001

LENGTH (miles / km) 0.69/ L11

DESCRPT: SR I1US 27/4TH AVENETERANS PKWY FM 13TH ST TO 19TH ST

EXIST. LANES: 04 PROPOSED LANES: 06

PE: 1992 ROW: 1998 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY $5,454,000 $4,363,200 $1,090,800

PROJECT: 323005- TYPE WORK: ATMSIITS

FUND:NHS

COLUMBUS TMA TIP # ST-LR-25

LENGTH (miles / km) 0/0.00

DESCRPT: ATMSI COLUMBUS/MUSCOGEE COUNTY/GDOT REGIONAL TCC

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$1,000,000 $800,000 $200,000

PROJECT: 332820- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP # 98-SR-0 I

LENGTH (miles / km) 15.5 /24.96

DESCRPT: SR INETERANS PWY FM OLD MOON RD TO FORTUNE HOLE RD/HARRIS

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 33282X-

PE: 1998 ROW: 2003 CST:

UNDERWAY $12,000,000 AFTER 2003

Page 254 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

MUSCOGEE COUNTY

PROJECT: 350690- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

PE: 1992

COLUMBUS TMA TIP # 86-SR-1 00 I

LENGTH (miles 1 km) 1.04/1.67

ROW: 1997

DESCRPT: SR 22 SPUR/MACON RD @ AUBURN AVE & BOXWOOD BLVD IN COLUMBUS

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY
$868,000 $694,400 $173,600

, PROJECT: 350730- TYPE WORK: WIDENING

FUND: STP

PE: 1993

COLUMBUS TMA TIP # 86-SR-2007

' LENGTH. (miles I km) 2.02/3.25

ROW: 1998

DESCRPT: TALBOTTON RD/SR 982/COLUMBUS FM 7TH AVE TO WOODRUFF/HILTON-Y

CST: 2002

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 35Y730-

GA Share:

. UNDERWAY UNDERWAY $10,3 I6,000 $8,252,800 $2,063,200

PROJECT: 350780- TYPE-WORK: WIDENING

FUND: STP

PE: 1992

COLUMBUS TMA TIP # 79-SR-2003

LENGTH (miles I km) . 2.14/3.45

ROW: 2001

DESCRPT: FOREST RD FM MACON{+MACON IMPROV} TO WOODRUFF FA/FLOYD RD-Y

CST: 2002 '

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 35Y780-

GA Share:
I

UNDERWAY $882,000
$6,073,000 $4,858,400 $1,214,600

PROJECT: 350785- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP # 79-SR-2016

LENGTH (miles 1 km) 1.9/3.06

DESCRPT: FORESTRD/SR 983 FM WOODRUFF FARM/FLOYD RD TO SCHATULGA &Y

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 35Y785-

PE: 1992 ROW: 2001 ' CST: 2002 ' FED Share: GA Share:

PROJECT: 350790- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP # 79-SR-2020

LENGTH (miles1 km) 0.91 I J.47

DESCRPT: ST MARYS RO/CS 2108/COLUMBUS FM BUENA VISTA TO ROBIN RD .

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY $1,000,000 $4,825,000 $3,860,000
$965,000

UNDERWAY
$1,939;000 $1,551,200
$387,800

PROJECT: 350870- TYPE WORK: WIDENING

FUND: NHS

COLUMBUS TMA TIP # 93-BR- I002

LENGTH (miles /ikm) 3.43 15.52

DESCRPT: SR 22 SP/MACON RD FM WOODRUFF FARM RD/CR 99 TO SR.22/US 80

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 350875-

PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$8,565,000 $6,852,000 $1,713,000

PROJECT: '350875- TYPE WORK: BRIDGE REHAB

COLUMBUS TMA TIP # 93-BR-IOOI

LENGTH (mileslkm)

DESCRPT: SR 22 SP/MACON RD @ BULL CREEK

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 350870-

FUND: BRIDGE

PE: 1992

0.02/0.03

ROW: NONE

CST: 2001

FED Share:

GA Share:

UNDERWAY
$4n,000 $376,800
$94,200

PROJECT: 350880- TYPE WORK: ,WIDENING

FUND: NHS

COLUMBUS TMA TIP # 92-SR-200 I

LENGTH (miles 1 km) 1.67 12.69

DESCRPT: MACON RD/SR 22SP FM REESE RD/CS2 I II TO WOODRUFF FRM RD/CR 99

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 1999 ' CST: 2001 . FED Share: GA Shure:

UNDERWAY UNDERWAY $4,081,000 $3,264,800
$816,200

Page 255 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

MUSCOGEE COUNTY

PROJECT: 350970- TYPE WORK: NEW CONSTRUCTION

FUND: STP

COLUMBUS TMA TIP # 98-SR-1660

LENGTH (miles I km) 2.1 13.38

DESCRPT: NEW ROAD/ MILLER TO BILLINGS RD & HOLLAND DR TO GATEWAY DR

EXIST. LANES: 00 PROPOSED LANES: 02

PE: 2001 . ROW: LOCL CST: 2002 FED Share: GA Share:

$5,000
$448,000 $358,400
$89,600

PROJECT: 351000- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

PE: 1996

COLUMBUS TMA TIP # 79-SR-2004

LENGTH (miles I km) 0.2/0.32

ROW: LOCL

DESCRPT: SR 22SP/MACON RD/WYNNTON AT BROWN AVENUE AND PEACOCK AVENUE

CST: 200 I

FED Share:

GA Share:

UNDERWAY
$587,000 $469,600 $1 17,400

PROJECT: 351010- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP #

LENGTH (miles I km) 0.67 I 1.08

DESCRPT: CS 1618/WHITTLESEY ROAD FROM WHITESVILLE RD TO VETERANS PKWY

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1998 ROW: LOCL CST: 2003 FED Share: GA Share:

UNDERWAY
$1,828,000 $1,462,400
$365,600

PROJECT: 351020- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP # 86-SR-2002

LENGTH (miles I km) 0.5 10.81

DESCRPT: CS'1425/54TH STREET FROM CHUMAR DR TO VETERANS PARKWAY

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1998 ' ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$685,000 $548,000 $137,000

PROJECT: 351190- TYPE WORK: WIDENING

COLUMBUS TMATIP # BV-2002

LENGTH (miles I km)

DESCRPT: BUENA VISTA ROAD FM 1-185 TO DOGWOOD DRIVE

EXIST. LANES: 05 PROPOSED LANES: 06

FUND: STP 0.41/0.66

PE: 2001 ROW: LOCL CST:

$\00,000
.-
AFTER 2003

PROJECT: 35Y780- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP # 79-SR-2003

LENGTH (miles I km) 0 10.00

DESCRPT: FORREST RD FM MACON RD TO WOODRUFF FARM RD- Q23 $ 350780

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 350780-

PE: 1992 ROW:200J CST: NONE

UNDERWAY $3,828,000

PROJECT: 35Y785- TYPE WORK: WIDENING

' FUND: STP

COLUMBUS TMA TIP # 79-SR-2016

LENGTH (miles Ikm) 0/0.00

DESCRPT: FORREST RD FM WOODRUFF FARMIFLOYD TO SCHATULGA-Q23 $; 350785

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 350785-

PE: 1992 ROW: 2001 CST: NONE

UNDERWAY $8,750,000

PROJECT: 371762- TYPE WORK: BICYCLE/PED. FACILITY

FUND:STP

COLUMBUS TMA TIP # 98-NRVRWLK

LENGTH (miles I km) 0/0.00

DESCRPT: RIVERWALK TRAIL ALONG CHATTAHOOCHEE RIVER PHASES 1&2

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

$2,500,0~0
$2,000,000
$500,000

Page 256 of336

---_._-- ._---

..._-_._--_._.._ . _ - - - - - _..__. _ - -

STATE TRANSPORTATION IMPROVEMENT PROGRAM'

9/21/00

MUSCOGEE COUNTY

PROJECT: 302005- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

COLUMBUS TMA TIP #

LENGTH (miles / km) 0 /0.00

ROW: NONE

DESCRPT: TIRE LEASING; ENGINE REBUILD PROGRAM:.TRANSMISSION REBUILD

CST: 2001

FED Share:

GA Share:

OTH Share:

PROJECT: 302007- TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles/ km)

DESCRPT: TRANSIT CAPITAL ITEMS

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002.

FED Share:

GA Share:

OTHShare:

PROJECT: 302010- TYPE WORK: CAPITAL COLUMBUS TMA TIP # DESCRPT: TRANSIT COACHES

LENGTH (miles / km)

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTH Share:

PROJECT: 302011- TYPE WORK: CAPITAL COLUMBUS TMA TIP # DESCRPT: TRANSIT COACHES

LENGTH (miles / km)

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTH Share:

PROJECT: 3V7038- TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$1,199,000 $1,066,000
$133,000 $133,000
$1,235,000 $1,098,000
$137,000 $137,000
$450,000 $400,000
$50,000 $50,000
$450,000 $400,000
$50,000
$50,000
~
$43,000 $43,000 $11,000

PROJECT: T000134 TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 COLUMBUS SECTION 5307 CAPITAL

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

PROJECT: TOOOl35 TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles / km) .

DESCRPT:FY 2003 COLUMBUS SECTION 5309. CAPITAL

FUND: TRANSIT . PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTHShare:

PROJECT: TOOOl36 TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 COLUMBUS SECTION 5310 CAPITAL

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Shores

$4,046,000 $3,596,000
$450,000 $450,000
$450,000 $400,000
$50,000 $50,000
$47,000 $47,000 $12,000

Page 257 of336

__ .... ..._---------

_-_._ .. ..:--_......,

.. -'.---_.,---_.

STATE TRANSPORTATION IMPROVEMENT PROGRAM

.... .._-"",.,,...... ..__._ . ."'.. ...-.:"',..,.. ..._ - - ""'.,....,..~

~-----_

~~..-

~-_

9121100
----.,;--"'------;-~,.~,.-------_

MUSCOGEE COUNTY

PROJECT: T000226 TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles / km)

DESCRPT: FY 2002 COLUMBUS SECTION 53 I0 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$45,000 $45,000 $11,000

Page 258 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

NEWTON COUNTY
PROJECT: 0000168 TYPE WORK: SIDEWALKS LENGTH (miles I km)
DESCRPT: COVINGTON WEST STREET STREETSCAPE

FUND: STP 010.00

PE: LOCL ROW: LOCL .CST: 2001 .
FED Share:

PROJECT: 0000842 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles I km)
DESCRPT: SR I 62/SALEM ROAD AT SPRING ROAD/CR 33 LUMP SUM PROJECT

FUND:STP 0.32/0.52

OTH Share:
PE: 2001 ROW: LOCL CST: 2003 FED Share: GA Share:

$164,000 $131,000
$33,000
$22,000
$328,000 $295,200
$32,800

PROJECT: 210530- TYPE WORK: INTERCHANGE

FUND: 1M

LNGTH(mileslkm) 0.71/1.14

DESCRPT: 1-20 @ SR 142-12/COVINGTON (INCL RELOC OF FRONTAGE RD/CR 72)

ASSOCIATED PROJECTS: 231220-

PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $5,250,000 $4,223,000 $3,800,700 $422,300

PROJECT: 210810- TYPE WORK: WIDENING

FUND:NHS

LENGTH (miles I km) 1.8212.93

DESCRPT: 1-20 FM ALCOVY ROAD INCL INTERCHANGE TO SR 142 IN COVINGTON

EXIST. LANES: 04 PROPOSED LANES: 06

PE:1998 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $110,000
$9,050,000 $7,240,000 $1,810,000

PROJECT: 210860- TYPE WORK: LIGHTING LENGTH ('~iles I km)
DESCRPT: 1-20 AT EXIT 45AJALCOVY ROAD -- Lk;HTING LUMP SUM PROJECT

FUND:NHS 0.48/0.77

PE: 1997 ROW: NONE CST: 2003 FED Share: GA Share:

UNDERWAY
$338,000 $270,400 $67,600

PROJECT: 210870- TYPE WORK: LIGHTING

FUND:NHS

LENGTH (miles I km) . 0.24/0.39

DESCRPT: 1-20 AT EXIT 46/SR 142 -- LIGHTING

LUMPSUM PROjECT

PE: 1997 ROW: NONE CST: 2003 FED Share: GA Share:

'UNDERWAY
$266,000 $212,800
$53,200

PROJECT: 210880- TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles I km)

I 11.61

DESCRPT: 1-20 SAFETY UPGRADES @ 2 LOCINEWTON & I LOC/WALTON

ASSOCIATED PROJECTS: 21088X-

PE: 1997 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$8,663,000 $7,796,700
$866,300

PROJECT: 231210- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 4 16.44

DESCRPT: SR I 621SALEM RD FM BROWN BRDGE RD TO S/FLAT SHOALSIROCKDALE

EXIST. LANES: 02 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 23121 X-

PE: 1999 ROW: 2001 CST:

UNDERWAY $600,000
AFTER 2003

Page 259 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _ _ _._.

9/21/00

..*

.._. ,._ ....., > ' < ' _ ' " _..O'<...._

..... . . . , . . , . ,. . . . . _ _ ... _ _ - . .. . _ _ ' " -"':,.~

,_.""":_,......-~,,:~

~

..........._ ,

_

NEWTON COUNTY

PROJECT: 231220- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 1.07/1.72

DESCRPT: SR 142 FM S OF SR 12/US 278 NORTH TO N OF CR 75 IN COVINGTON

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 210530-

PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $293,000
$3,750,000 $3,000,000
$750,000

PROJECT: 231625- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 1.8/2.90

DESCRPT: SR 81 PASSING LANE SW OF PORTERDALE FM MP 3.4 TO MP 5.2

EXIST. LANES: 02 PROpOSED LANES: 04

PE: 1999 ROW: 2001 CST:

UNDERWAY $100,000
AFTER 2003

PROJECT: 231630- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 12/US 278 FM JUST E OF MILL ST E TO SR 142/S-774 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 231635-

FUND: STP 3.45 /5.55

PE: 1998 ROW: 2003 CST:

UNDERWAY $367,000
AFTER 2003

PROJECT: 231690- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 3.3 /5.31

DESCRPT: SR 36 @ 3 LOCATIONS BETWEEN BUTTS COUNTY LINE AND CR 188

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1999 ROW: 2001 CST: 2003 FED Share: GA Shure:

UNDERWAY $28,000
$3,810,000 $3,048,000
$762,000

PROJECT: 232330- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.8 /1.29

DESCRPT: SR 36 AT FLAT SHOALS/STEELE RD/CR 18/ & HENDERSON MILLlCR506

LUMP SUM PROJECT

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$341,000 $306,900 $34,100

PROJECT: 242230- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 142 FM 1-20 TO ALCOVY RD IN COVINGTON EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 1.21 /1.95

PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $100,000
$3,996,000 $3,196,800
$799,200

PROJECT: 245190- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.56/0.90

DESCRPT: SR 212 @CR 191N OAK HILL-INTERSECTION IMPROVEMENTS

PE: 2000 ROW: 2003 CST:

UNDERWAY $304,000
AFTER 2003

PROJECT: 245380- TYPE WORK: REPLACE BRIDGE' LENGTH (miles / km)
DESCRPT: SR 20@ SOUTH RIVER NEWTON-HENRY CO LINE
ASSOCIATED PROJECTS: 24538X-

FUND: BRIDGE

PE: 2001

0.27/0.43

ROW: 2002

CST: 2003

FED Share:

GA Share:

$32,000 $10,000 $1,374,000 $1,099,200 $274,800

Page 260 of336

"'~--_""'

STATE TRANSPORTATIONIMPROVEMENT PROGRAM

9/21/00
t<IlI"l\:t _ _,_~~"_,,,,,,,,~_~,,_,,,,,~_,,,,,,,,,,,,,,,,,,,,,,.,,,,,_,,,,,,,,,,,,,,1I"W'_'_"""_""'

. _...'

,~_...__ .....,....,.:..._,r.<. t, ~ . . . . "._.~~..,,..~.,

NEWTON COUNTY
PROJECT: 271304- TYPE WORK: LANDSCAPING LENGTH(miles / km)
DESCRPT: STREETSCAPES IN THE CITY OF COVINGTON-PHASE I

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$959,000 $767,000

OTH Share:

PROJECT: 33317X- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0/0.00

DESCRPT: SR 36 @ SOUTH RIVER AT BUTTS-NEWTON CO L1NEIS~E B,UITS 333172

PE:NONE ROW: NONE CST: NONE

$192;000

ASSOCIATED PROJECTS: 333172-

; \-

j . ,"

~

I 'I

Page 261 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

__)

---"--------_._ -_._--_.-_. .- ... 9/21/00 . ~,-~-_.----".

-------"

OCONEE COUNTY

PROJECT: 0000169 TYPE WORK: LANDSCAPING

ATHENS TIP #

LENGTH (miles I km)

DESCRPT: US 441/SR 53 INTERCHANGE LANDSCAPING

FUND: STP
0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$75,000 $60,000

OTH Share:

PROJECT: 122660- TYPE WORK: WIDENING

FUND: STATE

ATHENS TIP # 11-05(2)

LENGTH (miles I km), 8.74/14.07

DESCRPT: SR 24/US 44 I FM N OF APALACHEE RIVER TO WATKINSVILLE BP

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1994 ROW: 2003 CST:

$15,000
UNDERWAY $3,664,000 AFTER 2003

PROJECT: 142060- TYPE WORK: WIDENING

FUND: STP

ATHENS TIP # 11-05

LENGTH (miles / km) 1.8512.98

DESCRPT: SR 53 FM HOG MTN RD (CR 274) TO SR I5/US 441 IN WATKINSVILLE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 141980-

PE: 1998 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $1,100,000 $3,500,000 $2,800,000
$700,000

PROJECT: 170543- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.2 /0.32

ROW: LOCL

DESCRPT: CR 121/HALE ROAD@GREENBRIARCREEK 4.5 MI SE OF FARMINGTON

CST: 2002

FED Share:

GA Share:

UNDERWAY
$393,000 $314,400 $78,600

PROJECT: 171460- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATHENS TIP # V-02

LENGTH (miles I km) 2.5/4.03

DESCRPT: SIMONTON BRIDGE ROAD FM WATKINSVILLE TO CLARKE COUNTY

ASSOCIATED PROJECTS: 141970-

PROJECT: 171574- TYPE WORK: SIDEWALKS

FUND: STP

ATHENSTlP#V-05

LENGTH (mi/eslkm) 4.9/7.89

DESCRPT: STREETSCAPES FOR BUTLER'S CROSSING IN WATKINSVILLE

PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PE: 2003 ROW: LOCL CST: 2003 FED Share:

PROJECT: 245130- TYPE WORK: REPLACE BRIDGE

FUND: STP

LENGTH (miles / km) 0.43 10.69

DESCRPT: SR 15 @ ROSE CREEK BETWEEN GREENSBORO & WATKINSVILLE

OTH Share:
PE: 1997 ROW: 2001 CST:

$394,000 $315,000
$79,000
$23,000
$227,000 $182,000
$45,000
UNDERWAY $50,000
AFTER 2003

Page 262 of336

STATE TRANSPORTAT.ION IMPROVEM, ENT PROGRAM

_ _ _ _ _ _ _ _ _._._._ _,

"_'_00 _.

9/21/00



. _ ,_ . _

~

. _.,_

_ _..,

,

OGLETHORPE COUNTY
PROJECT: 222460- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 10 FM 10.2-12.2113.7-15.0115.3-16.2IWILKES: 0-1.715.5-7.q EXIST. LANES: 02 PROPOSED LANES: 03

FUND: STP 7.4 / I 1.91

PE: 1997 ROW: 2001 CST: .

UNDERWAY $100,000
AFTER 2003

PROJECT: 231910- TYPE WORK: NEW CONSTRUCTION

FUND: STP ..

LENGTH (miles / km) 6.3 /10. 14

DESCRPT: CRA WFORDILEXINGTON BYP FM E OF CR 26/SMOKEY RD SE TO SR 22

EXIST. LANES: 00 PROPOSED LANES: 04

PE: 1999 ROW: 2003 CST:

UNDERWAY $1,459,000 AFTE;R 2003

PROJECT: 232315- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.2 I /0.34

DESCRPT: SR 77@GOOSEPONDCREEK 14.5 MI NE OF LEXINGTON

PE: 1999 ROW: 2003
CST~

UNDERWAY $10,000
AFTER 2003

PROJECT: 245370- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 22 @ LONG CREEK 3.5 MI S OF LEXINGTON

FUND: BRIDGE 0.23 /0.37

PE:1999, ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 245371- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

.. LENGTH (miles / km). 0.23 /0.37

DESCRPT: SR 22 @ BIG CLOUDS CREEK 3.8 MI E OF SMlTHSONIA

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 245372- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

. LENGTH (miles / km) 0.24/0.39

DESCRPT: .SR 22 @ SOUTH FORK BROAD RIVER.4 MI NE 9F SMlTHSONIA

PE: 1999 , ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page 263 of336

---------_._--_.

- - - _.._----------_._._---

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

PAULDING COUNTY
PROJECT: 621570- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 61 FM SR 120 CONN TO SR 6/DALLAS BYPASS EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 641830-

FUND: NHS 3.2 15.15

PE: 1996 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $3,500,000 $8,000,000 $6,400,000 $1,600,000

PROJECT: 631142- TYPE WORK: MINOR WIDEN & RESURF LENGTH (miles I km)

FUND: STP 10 00

DESCRPT: CR 440lCR 470lCR 441 FM CR 168 TO CR 226/PAULDING ..SEE POLK

ASSOCIATED PROJECTS: 631148-

PE:NONE ROW: NONE . CST: NONE

PROJECT: 632660- TYPE WORK: REPLACE BRIDGE LENGTH (mileslkm)
DESCRPT: SR 120 OVER LANE CREEK 2.3 MI SW OF DALLAS

FUND: BRIDGE

PE:1997

0.42/0.68

ROW: 2000

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY
$413,000 $330,400
$82,600

PROJECT: 632776- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles I km)
DESCRPT: SR 92 AT CR 283/BROWNSVILLE ROAD LUMP SUM PROJECT

FUND: STP 0.54/0.87

PE: 1999 ROW: 2001 CST: 2001 FED Share: GA Share:

UNDERWAY $170,000 $403,000 $362,700 $40,300

PROJECT: 64Y830- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles I km) 0.29 10.47

DESCRPT: SR 61 FM CR 341 TO SR 6/DALLAS BYP & RR BR{FOR 31A $}/641830

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 641830-

PE: 1993 ROW: 2001 CST:

UNDERWAY $100,000
AFTER 2003

PROJECT: 670366- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles I km) 0.23/0.37

ROW: LOCL

DESCRPT: CR 842/0LD HARRIS ROAD@SOUTHERN RR (719808G) SE OF DALLAS

CST: 2003

FED Share:

GA Share:

OTH Share:

. UNDERWAY
$929,000 $743,200
$92,800 $93,000

.!:-
Page 264 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00.

PEACH COUNTY

PROJECT: 0000128 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles I km)

FUND: STP 0/0.00

DESCRPT: BYRON RAILROAD DEPOT MUSEUM/RAILROAD CABOOSE & CITY PARK

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000757 TYPE WORK: BARRIERS

WARNER ROBINS TIP # 2000( I)

LENGTH (miles I km)

DESCRPT: RICHARD RUSSELL PKWY NOISE BARRIERS

OTH Share:

FUND: STATE 0/0.00

PE: 1995 ROW: LOCL CST: 2001

GA Share:

$120,000 $96,000 $24,000
UNDERWAY $1,000,000
$1,000,000

PROJECT: 3 11540- TYPE WORK: INTERCHANGE

WARNER ROBINS TIP # WR 1-I 993( I)

LEN(iTH (miles I km)

DESCRPT: 1-75 @ SR 96

EXIST. LANES: 02 PROPOSED LANES: 04

. FUND: 1M I 11.61

PE: 1993 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY $4,444,000
$3,999,600 $444,400

PROJECT: 311700- TYPE WORK: INTERCHANGE

WARNER ROBINS TIP # WRI-1996(3)

LENGTH (mileslkm)

DESCRPT: 1-75 AT THE PROPOSED RICHARD RUSSELL PARK WAY

: EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 363760-

FUND:NHS 0.2/0.32
, '.

PE: 1995 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$3,900,000 $3,120,000
$780,000

PROJECT: 36313X- TYPE WORK: WIDENING LENGTH (miles I km)

FUND: ST.ATE 0 10.00

DESCRPT: SR 96 FM E OF FLINT RIV TO FT VALLEY BY/SR 49C & BRID/CRA WFD

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 363130-

PE:NONE ROW: NONE CST: NONE

c PROJECT: 363760- TYPE WORK: ,NEW CONSTRUCTION

FUND: STATE

WARNER ROBINS TIP # WR 1-1996(2)

LENGTH (miles I km) 5 18.05

DESCRPT: RICHARD RUSSELL PKWY FM E OF 1-75 TO CORDER RD/HOUSTON

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 36376X- 311700-

PE: 1995 ROW: LOCL CST: 2001
GA Share:'

UNDERWAY $11,843,000 $11,843,000

PROJECT: 363790- TYPE WORK: NEW CONSTRUCTION

FUND: STATE

LENGTH (miles I km) 0.55 10.89

DESCRPT: SR 894/UNIVERSITY BLVD FM 5R 49 TO ST COLLEGE DR-FT VALLEY

EXIST. LANES: 00 PROPOSED LANES: 02 .

PE:NONE ROW: 1997 CST: 2001
GA Share:

UNDERWAY $791,000
$791,000

PROJECT: 363820- TYPE WORK: WIDENING

FUND: STATE

LENGTH (mileslkm) 4.87/7.84

DESCRPT: SR 49C1FT VALLEY BYP FM BEVERLY RD NE TO SR 49 - ADD 2 LANES

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 2001 CST:

UNDERWAY $10,000
AFTER 2003

Page 265 of336

STATE TRA/ySPORTATION IMPROVEMENT PROGRAM
9/21/00

PEACH COUNTY

PROJECT: 363910- TYPE WORK: REALIGNMENT

FUND: NHS

LENGTH (miles / km) . 1.2/1.93

DESCRPT: 1-75 @SR49RELOCATE FRONTAGE RDS CHAPMAN RD & INDUST BLVD

PE: 2001 ROW: CST:

$151,000 AFTER 2003 AFTER 2003

Page 266 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

PICKENS COUNTY

PROJECT: 0000142 TYPE WORK: RICiHTS-OF-WAY LENGTH (miles / km)

FUND: STP 0 /0.00

DESCRPT: BURNT MOUNTAIN SCENIC PRESERVATION PR9PERTY ACQUISITION

PE:LOCL ROW: 2001 CST: NONE

$938,000

PROJECT: 621490- TYPE WORK: WIDENING LENGTH (miles / km)
.DESCRPT: SR 53 FM SR 515/APD TO CR 243/1NDUSTRIAL BLVD EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 1.4.12.25

PE: 1992 ROW: 2003 CST:

UNDERWAY $1,200,000 AFTER 2003

PROJECT: 621590- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 2.36/3.80

DESCRPT: SR 53 - WB PASSING LNS EAST OF TATE MP 20.4-21.3 & 22.6-24.1

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 2000 ROW: 2001 CST: 2001 FED Share: GA Share:

UNDERWAY $0
$1,633,000 $1,306,400
$326,600

PROJECT: 621595- TYPE WORK: PASSING LANES

FUND: STP

LENfiTlI (miles / km) 2.94/4.73

DESCRPT: SR 53 - EB PASSING LNS EAST OF TATE MP 24.3-25.4 & 26.5-28.4

EXIST. LANES: 02 PROPOSED LANES: 03

PE:2000 ROW: 2002 CST:

UNDERWAY $175,000
AFTER 2003

PROJECT: 642140- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles / km) 0.2 /0.32

ROW: 2001

DESCRPT: SR 136 BRlDGE REPLACEMENT OVER TALKING ROCK CREEK N OF SR 53

CST: 2002

FED Share:

GA Share:

UNDERWAY $14,000
$466,000 $372,800
$93,200

Page 267 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

. PIERCE COUNTY
PROJECT: 0001115 TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: CR 191/BOWEN RD IN BLACKSHEAR@CSX# 637256R LUMP SUM PROJECT

FUND: STP 0/0.00

PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$100,000 $80,000 $20,000

PROJECT: 522340- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 6.9/1 1.11

DESCRPT: SR 38/US 84 FM CR I07/0FFERMAN TO S CITY LMTS SCREVEN/WAYNE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 52234X-

PE: 1993 ROW: 2001 CST:

UNDERWAY $1,667,000 AFTER 2003

PROJECT: 533 170- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.26/0.42

DESCRPT: SR 15 @ BIG SATILLA CREEK AT APPLING COUNTY LINE

ASSOCIATED PROJECTS: 533 I7X-

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 542370- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.4 /0.64

DESCRPT: SR 203/STRICKLAND STREET AT OLD ALMA ROAD/CR 309

PE: 2001 ROW: CST:

$10,000 AFTER 2003 AFTER 2003

(
Page 268 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9121100

PIKE COUNTY

PROJECT: 333110- TYPE WORK: INTERSECTION IMPROVEMENT

.

LENGTH (miles / km)

DESCRPT: SR 18/SR 109 AND SR 74 INTERSECTION IMPROVEMENT

FUND: STP 0.2/0.32

PE: 2000 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY

$547,000

~

$605,000

$484,000

$121,000

PROJECT: 333145- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 18 @ ELKINS CREEK .1 MI W OF ZEBULON

FUND: BRIDGE 0.24/0.39

PE: 1999 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 343385- TYPE WORK: REPLACE BRIDGE

I

LENGTH (miles / km)

DESCRPT: SR 109 @ ELKINS CREEK .5 MI E OF MOLENA

FUND: BRIDGE 0.24/0.39

PE: 1999 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

Page 269 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

POLK COUNTY
PROJECT: 0000115 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: DEPOT/HISTORIC DISTRICT OF CEDARTOWN

FUND:STP 0/0.00

PE:LOCL ROW: LOCL . CST: 2001 FED Share:

PROJECT: 0000116 TYPE WORK: SIDEWALKS LENGTH (miles / km)
DESCRPT: ROCKMART STREETSCAPE PROJECT

FUND: STP 0/0.00

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 620645- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 6.27/ 10.09

DESCRPT: SR 6 FM OLD CEDARTOWN RD/CR 193 E TO SR IOIlROCKMART/62Y645

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 62Y645-

OTH Share:
PE: 1992 ROW: 1997 CST: 2003 FED Shure: GA Share:

$655,000 $524,000
$131,000
$310,000 $248,000
$62,000 UNDERWAY UNDERWAY
$5,017,000 $4,013,600 $1,003,400

PROJECT: 62I43X- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: SR 113 FM TAYLORSVILLE CL TO CR 31/STILESBORO..SEE BARTOW

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 621430-

PE:NONE ROW: NONE CST: NONE

PROJECT: 621860- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles/ km) 5.75/9.26

DESCRPT: CEDARTOWN BYPASS WIDENING FM SR 100 N TO JUST S. OF CR 334

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 62Y860-

PE: 1995 ROW: 2001 CST:

UNDERWAY $845,000
AFTER 2003

PROJECT: 62Y645- TYPE WORK: WIDENING

FUND: HPP

LENGTH (miles / km) 6.27 / 10.09

DESCRPT: SR 6 FM OLD CR 193 E TO SR 101 - FOR HPP $ SEE 620645

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 620645-

PE: 1992 ROW: NONE CST: 2003 FED Share: GA Shure:

UNDERWAY
$4,490,000 $3,592,000
$898,000

PROJECT: 631148- TYPE WORK: MINOR WIDEN & RESURF

FUND: STP

LENGTH (miles / km) 6.53 / 10.51

DESCRPT: CR 440/470/441 FM CR 168 THRU PAULDING TO CR 226/0LD ATL HWY

ASSOCIATED PROJECTS: 631142-

PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $129,000
$3,099,000 $2,479,200
$619,800

PROJECT: 63114X- TYPE WORK: MINOR WIDEN & RESURF

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: CR 342/CR 440 FM CR 345/HARALSON TO CR I68/POLK-SEE HARALSON

ASSOCIATED PROJECTS: 631145-

PE:NONE ROW: NONE CST: NONE

Page 270 of336

STATE TRANSPORTATION IMPROVEMENT PRo,GRAM
9/21/00

POLK COUNTY
PROJECT: 641880~ TYPE WORK: TURN LANES LENGTH (miles / km)
DESCRPT: SR I BUSFM THORNTON AVE TO CEDARTOWN BYPASS

FUND: NHS 1.08/1.74

PE: 1994 ROW: 1999 CST: 2001 FED Share:

UNDERWAY UNDERWAY $1,271,000 $1,271,000

PROJECT: 670678- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE:2001

.. L.ENGTH (miles / km) 0.2 /0.32

ROW: LOCL

DESCRPT: CR 182/BETHLEHEM ROAD@FISH CREEK 5.7 MI W OF ROCKMART

CST: 2003

FEDShllre:

GA Share:

$19,000
$191,000 .$152,800
$38,200

.".

Page 2710/336 )

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

PULASKI COUNTY

PROJECT: 322180- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 9.5 /15.30

DESCRPT: SR 27/US 341 FM SR 230/HAWKINSVILLE E TO DODGE CO LINE

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 1994 CST: 2001
GA Share:

UNDERWAY UNDERWAY $18,670,000
$18,670,000

PROJECT: 333080- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 257 @ TEN MILE CREEK 3.5 MI NW OF FINLEYSON

FUND: BRIDGE

PE: 1999

0.22/0.35

ROW: 2001

CST: 2003

FED Share:

,GA Share:

UNDERWAY $10,000
$330,000 $264,000
$66,000

PROJECT: 343000- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.26 /0.42

DESCRPT: SR 230 @ BIG CREEK 5.6 MILES WEST OF HAWKINSVILLE

PE: 1995 ROW: 2001 CST:

UNDERWAY $50,000
AFTER 2003

Page 272 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

PUTNAM COUNTY

PROJECT: 0001077 TYPE WORK:' . INTERSECTION IMPROVEMENT

FUND: MIN. GUARAN PE: 2001

LENGTH (miles 1 km) 0.53/0.85

ROW: 2003

DESCRPT: SR 16 FM JEFFERSON AVE TO EAST OF S. GRAND AVE IN EATONTON

CST:

$49,000 $168,000 AFTER 2003

PROJECT: 222470- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 10.4 116.66

DESCRPT: SR 24/US 441 FM CR 245 TO EATONTON BYPASS @ US 129

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 22Y470-

PROJECT: 222580- TYPE WORK: WIDENING

FUND: STATE

.

LENGTH (miles 1 km) 9.04/14.55

DESCRPT:SR 24/US 441 FM EATONTON BP@CR 17/REIDS RD TO MORGAN CL

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 2003 CST:

UNDERWAY $2,489,000 AFTER 2003

PE: 1994 ROW: 2003 CST:

UNDERWAY $4,809,000 AFTER 2003

PROJECT: 231270- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles 1 km) 0.31 10.50

DESCRPT: SR 16 OVER THE OCONEE RIVER @ HANCOCK COUNTY LINE

PE: 1997' ROW: 2001 CST:

UNDERWAY $50,000
AFTER 2003

PROJECT: 23 1610- TYPE WORK: WIDENING

FUND: STP

LENGTH (mileslkm) 5.14/8.28

DESCRPT: SR 24/EATONTON BYPASS- REMAINING TWO LANES NORTHBOUND

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 1999 CST: 2003 FED Share: GA Share:

UNDERWAY UNDERWAY ~ $2,426,000 $1,940,800
$485,200

PROJECT: 231620- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles 1km) 5.07 18.16

DESCRPT: SR 44 FOUR PASSING LANES NB & SB BETWEEN EATONTON & GRAY

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1998 ROW: 2001 CST:

UNDERWAY $100,000
AFTER 2003

PROJECT: 232295- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles 1km) 0.22/0.35

DESCRPT: SR 16@ ROOTY CREEK IN EAST EATONTON

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 245350- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 16 @ CROOKED CREEK 6 MI E OF EATONTON

FUND: BRIDGE

PE: 1999

0.22/0.35

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY , $10,000
$639,000 $511,200 $127,800

Page 273 of336

STATE TRANSPORTATION IMpJUivEMENT PROGRAM
9/21/00

PUTNAM COUNTY
PROJECT: 270760- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: CR 212/FH 24 SOUTH OF SR 24 @TOWN CREEK

FUND: BRIDGE

PE: 1996

0.4 /0.64

ROW: LOCL

CST: 2002

FED Share:

GAShare:

UNDERWAY
$515,000 $412,000 $103,000

PROJECT: 271130- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: MARTIN MILL RD/eR 29/FH 27 @ LITTLE RIVER

FUND: FOREST HWY PE: 1996

0.79/1.27

ROW: LOCL

CST: 200 I

FED Share:

UNDERWAY
$1,404,000 $1,404,000

Page 274 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

QUITMAN COUNTY

PROJECT: 431520- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.38/0.61

DESCRPT: SR SO/US 82 REALIGNMENT IN THE CITY OF GEORGETOWN

PE: 1996 ROW: 1998 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$2,000,000 $1,800,000
$200,000

. Page 275 of336

STATE TRANSPORTATION IMpROVEMENT PROGRAM
9/21/00

RABUN COUNTY
PROJECT: 0000306 TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 28 @ CHATIOOGA RIVER 13 MI NE OF CLA YTON

FUND: BRIDGE 0.24 10.39

PE: 2001 ROW: CST:

$66,000 AFTER 2003 AFTER 2003

PROJECT: 121950- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (mileslkm) 2.32/3.74

DESCRPT: SR 2 FM LAKE BURTON BRIDGE TO CHARLIE MTN RD/CR 94 & REALIGN

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1993 ROW: 1996 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY $8,444,000 $6,755,200 $1,688,800

PROJECT: 122320- TYPE WORK: WIDENING

FUND:NHS

LENGTH (mileslkm) 9.76/15.71

DESCRPT: SR 15IUS 441 FM N OF TALLULAH FALLS TO S CL OF CLAYTON

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 12Y320-

PE: 1993 ROW: 2002 CST:

UNDERWAY $19,863,000 AFTER 2003

PROJECT: 12Y090- TYPE WORK: WIDENING

FUND:NHS

LENGTH (miles 1 km) 0/0.00

DESCRPT: SR 15/US 441 FM NO. CUCLA YTON TO NC LINE-FOR FED PEII 22090

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 122090-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 171580- TYPE WORK: . REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: CR 80 AT TALLULAH RIVER 6.6 MI SW OF TIGER

FUND: BRIDGE

PE: 2000

0.22/0.35

ROW: LOCL .

CST: 2003

FED Share:

GA Share:

UNDERWAY
$547,000 $437,600 $109,400

" Page 276 0/336

;----------~~~~~~---- -- - --------------~~- - - - - - - - - - - - - - - - - - - - ~ -
STATE TRANSPORTATIONIMPROVEMENTPROGRAM
9/21/00

RANDOLPH COUNTY

PROJECT: 422235- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 7.81 112.57

DESCRPT: SR IFM CARNEGIE VILULAH RD/CR 153 TO CUTHBERT BYPASS

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 431530- 42Y235-

PE: 1995 ROW: 2003 CST:

UNDERWAY $922,000
AFTER 2003

PROJECT: 42223X- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 0/0.00

DESCRPT: SR I FM BLUFFTON BYP TO CARNEGIE VILULAH RD/CR 153 - 422230

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 422230-

PE."NONE ROW: NONE CST: NONE

PROJECT: 422240- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 8.5/13.69

DESCRPT: SR IIUS 27 FR CUTHBERT BYP TO CR 116/LUSCIOUS QUEEN ROAD

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 1999 CST: 2003
GA Share:

UNDERWAY UNDERWAY $21,020,000
$21,020,09

PROJECT: 422245- TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR IIUS 27 FR CR 116 TO LUMPI\IN BYPASS/& STEWART EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 42224X-

FUND: STATE 7.78 1 12.53

PE: 1996 ROW: 1999 CST: 2003
GA Share:

UNDERWAY UNDERWAY $19,840,000
$19,840,000

PROJECT: 431530- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

LENGTH (miles 1 km) 0.21 10.34

ROW: NONE

,DESCRPT: SR IIUS 27@ GEORGIA/ALABAMA RR 2.2 MI S. OF CUTHBERT

CST: 2002

FED Share:

ASSOCIATED PROJECTS: 422235-

GA Share:

UNDERWAY
~
$631,000 $504,800 $126,200

PROJECT: 432095- TYPE WORK: REPLACE BRIDGE

.

LENGTH (miles 1 km)

DESCRPT: SR 50/US 82 @ PACHITLA CREEK 4 MI E OF CUTHBERT

FUND: BRIDGE 0.21/0.34

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 442955- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 216 @CARTER CREEK 4.6 MI S OF CUTHBERT

FUND: BRIDGE 0.22/0.35

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: M000337 TYPE WORK: SHOULDER WORK LENGTH (miles / km)
DESCRPT: SR 266 FM CLAY CO LN TO SR 50 LUMP SUM PROJECT

FUND: STP 11.2 118.06

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$657,000

$525,600

..

$131,400

Page 277 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

- - _ .__. _ - - - - - _ _ _ _... .... =_.".,"'''',._*~_..._.

_._.~

:_ _ ...... >_><n,..._.,~,....,....'''''''_.,.._".,,.,;'',.'...-...._

_

MORGAN COUNTY

PROJECT: 0000472 TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles / km) . 0.6/0.97

DESCRPT: 1-20 SAFETY UPGRADES @ SR 24; BUCKHEAD RD & SR 44/GREENE; X

ASSOCIATED PROJECTS: 00004X2

PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$11,400,000 $10,260,000
$1,140,000

PROJECT: 0001222 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.36/0.58

DESCRPT: SR 24/ATHENS HIGHWAY @ HARD LABOR CREEK & BIG SANDY CREEK

PE: 2002 ROW: CST:

$120,000 AFTER 2003 AFTER 2003

PROJECT: 210920- TYPE WORK: INTERCHANGE LENGTH (miles I km)
DESCRPT: 1-20 SAFETY UPGRADES @ NEWBORN RD AND SR 83

FUND: 1M 0.4 /0.64

PE: 1998 ROW: NONE CST: 2001 FED Share: GA SIMre:

UNDERWAY
$7,600,000 $6,840,000
$760,000

PROJECT: 245285- TYPE WORK: REPLACE BRIDGE.

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.21 /0.34

ROW: LOCL

DESCRPT: CR 251/SEVEN ISLAND ROAD @ SUGAR CREEK 1.8 MI S OF BUCKHEAD

CST: 2001

FED Share:

GA Share:

UNDERWAY
$568,000 $454,400 $113,600

Page 252 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

MURRA Y COUNTY

PROJECT: 0000687 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.22/0.35

DESCRPT: CR 4IDENNIS MILL ROAD@ ROCK CREEK 5.6 MI SE OF CHATSWORTH

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 620399- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 52 @ CSX RR IN CHATSWORTH

FUND: BRIDGE

PE: 1996

0.17 /0.27

ROW: 1996

CST: 2001.

FED Share:

GA Share:

UNDERWAY UNDERWAY
$1,732,000 $1,385,600
$346,400

PROJECT: 621260- TYPE WORK: REALIGNMENT LENGTH (miles / km)
DESCRPT: SR 282 RELOCATION FM SR 61IUS 411 E TO CR 309 EXIST. LANES: 00 PROPOSED LANES: 02

FUND: STP 1.2 / 1.93

PE: 1992 ROW: 2002 CST:

UNDERWAY $51,000
AFTER 2003

PROJECT: 631550- TYPE WORK: WIDENING

FUND: STP

.LENGTH (miles / km) 4 /6.44

DESCRPT: SR 225/SPRING PLACE BYP - NEW HOPE RD TO SR 225 S OF MILL CK

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 2002 CST:

UNDERWAY . $2,856,000 AFTER 2003

PROJECT: 642370- TYPE WORK: BRIDGES

FUND: STP

LENGTH (miles / km) 0.15 /0.24

DESCRPT: CR 19!OLD FEDERAL ROAD GRADE SEPARA T!ON AT CSX RAILROAD

PE: 2000 ROW: LOCL CST: 2002 FED Share: GA Share:

. UNDERWAY
$800,000 $720,000
$80,000

PROJECT: 642410- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 282 @ ROCK CREEK 5.3 MI S OF CHATSWORTH

FUND: BRlDGE 0.22/0.35

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 671212- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: MURRAY COUNTY BIKE LANES PHASE I

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 671230- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) 0.23/0.37
DESCRPT: RELOCATE CR 231 CONSTRUCT A CANOEIKAYAK RAMP & PARKING AREA

PE:2001 ROW: 2003 CST: 2003 FED Share: GA Share:

$233,000 $186,000
$47,000
$50,000 $10,000 $527,000 $421,600 $105,400

Page 253 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

MUSCOGEE COUNTY

PROJECT: 0000099 TYPE WORK: 'BICYCLE/PED. FACILITY

COLUMBUS TMA TIP # WSTRIAL-2000

LENGTH (miles I km)

DESCRPT: WARM SPRINGS RAIL LINE BIKE/PED TRAIL

FUND: STP 12/19.32

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 0000342 TYPE WORK: MINOR WIDEN & RESURF

FUND: NHS

COLUMBUS TMA TIP #

LENGTH (miles I km) 1.31 /2.11

DESCRPT: MACON RD/SR 22SP FM UNIVERSITY AVE/CS 959 TO REESE RD/CS2111

PE: 2001 ROW: CST:

$1,250,000 $1,000,000
$250,000
$100,000 AFTER 2003 AFTER 2003

PROJECT: 0000343 TYPE WORK: INTERSECTION IMPROVEMENT

COLUMBUS TMA TIP # ST-LR-32

LENGTH (miles I km)

DESCRPT: RIVER RD/SR 219 AT 54TH STREET/CS 1425 IN COLUMBUS

FUND: STP 0/0.00

PE: 2001 ROW: CST:

$10,000 AFTER 2003 AFTER 2003

PROJECT: 311445- TYPE WORK: WIDENING

FUND:NHS

PE: 1992

UNDERWAY

COLUMBUS TMA TIP # 91-ST-2001

LENGTH (miles I km) 2.8314.56

ROW: 2001

$319,000

DESCRPT: I-I 85/COLUMBUS FM SR 520 TO ST MARYS ROAD

CST: 2003

$13,966,000 .

EXIST. LANES: 04 PROPOSED LANES: 06

FED Share:

$11,172,800

ASSOCIA TED PROJECTS: 3 I 1630-
0.

GA Share:

$2,793,200

PROJECT: 311630- TYPE WORK: INTERCHANGE

COLUMBUSTMA TIP # 91-ST-2001

LENGTH (miles I km)

DESCRPT: 1-185 INTERCHANGE AT SR I/SR 520

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 311445-

FUND: 1M 1.61/2.59

PE: 1994 ROW: 2001 CST:

UNDERWAY $2,107,000 AFTER 2003

PROJECT: 321810- TYPE WORK: BRIDGE REHAB

FUND:NHS

COLUMBUS TMA TIP # 86-UD-3001

LENGTH (miles / km) 0.691 L11

DESCRPT: SR I1US 27/4TH AVENETERANS PKWY FM 13TH ST TO 19TH ST

EXIST. LANES: 04 PROPOSED LANES: 06

PE: 1992 ROW: 1998 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY $5,454,000 $4,363,200 $1,090,800

PROJECT: 323005- TYPE WORK: ATMSIITS

FUND:NHS

COLUMBUS TMA TIP # ST-LR-25

LENGTH (miles I km) 0 10.00

DESCRPT: ATMSI COLUMBUS/MUSCOGEE COUNTY/GDOT REGIONAL TCC

PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:

$1,000,000 $800,000 $200,000

PROJECT: 332820- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP # 98-SR-0 I

LENGTH (miles I km) 15.5 124.96

DESCRPT: SR INETERANS PWY FM OLD MOON RD TO FORTUNE HOLE RD/HARRIS

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 33282X-

PE: 1998 ROW: 2003 CST:

UNDERWAY $12,000,000 AFTER 2003

Page 254 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

MUSCOGEE COUNTY

PROJECT: 350690- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

PE: 1992

COLUMBUS TMA TIP # 86-SR-1 00 I

LENGTH (miles 1 km) 1.04/1.67

ROW: 1997

DESCRPT: SR 22 SPUR/MACON RD @ AUBURN AVE & BOXWOOD BLVD IN COLUMBUS

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY
$868,000 $694,400 $173,600

, PROJECT: 350730- TYPE WORK: WIDENING

FUND: STP

PE: 1993

COLUMBUS TMA TIP # 86-SR-2007

' LENGTH. (miles I km) 2.02/3.25

ROW: 1998

DESCRPT: TALBOTTON RD/SR 982/COLUMBUS FM 7TH AVE TO WOODRUFF/HILTON-Y

CST: 2002

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 35Y730-

GA Share:

. UNDERWAY UNDERWAY $10,3 I6,000 $8,252,800 $2,063,200

PROJECT: 350780- TYPE-WORK: WIDENING

FUND: STP

PE: 1992

COLUMBUS TMA TIP # 79-SR-2003

LENGTH (miles I km) . 2.14/3.45

ROW: 2001

DESCRPT: FOREST RD FM MACON{+MACON IMPROV} TO WOODRUFF FA/FLOYD RD-Y

CST: 2002 '

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 35Y780-

GA Share:
I

UNDERWAY $882,000
$6,073,000 $4,858,400 $1,214,600

PROJECT: 350785- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP # 79-SR-2016

LENGTH (miles 1 km) 1.9/3.06

DESCRPT: FORESTRD/SR 983 FM WOODRUFF FARM/FLOYD RD TO SCHATULGA &Y

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 35Y785-

PE: 1992 ROW: 2001 ' CST: 2002 ' FED Share: GA Share:

PROJECT: 350790- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP # 79-SR-2020

LENGTH (miles1 km) 0.91 I J.47

DESCRPT: ST MARYS RO/CS 2108/COLUMBUS FM BUENA VISTA TO ROBIN RD .

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY $1,000,000 $4,825,000 $3,860,000
$965,000

UNDERWAY
$1,939;000 $1,551,200
$387,800

PROJECT: 350870- TYPE WORK: WIDENING

FUND: NHS

COLUMBUS TMA TIP # 93-BR- I002

LENGTH (miles /ikm) 3.43 15.52

DESCRPT: SR 22 SP/MACON RD FM WOODRUFF FARM RD/CR 99 TO SR.22/US 80

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 350875-

PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$8,565,000 $6,852,000 $1,713,000

PROJECT: '350875- TYPE WORK: BRIDGE REHAB

COLUMBUS TMA TIP # 93-BR-IOOI

LENGTH (mileslkm)

DESCRPT: SR 22 SP/MACON RD @ BULL CREEK

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 350870-

FUND: BRIDGE

PE: 1992

0.02/0.03

ROW: NONE

CST: 2001

FED Share:

GA Share:

UNDERWAY
$4n,000 $376,800
$94,200

PROJECT: 350880- TYPE WORK: ,WIDENING

FUND: NHS

COLUMBUS TMA TIP # 92-SR-200 I

LENGTH (miles 1 km) 1.67 12.69

DESCRPT: MACON RD/SR 22SP FM REESE RD/CS2 I II TO WOODRUFF FRM RD/CR 99

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 1999 ' CST: 2001 . FED Share: GA Shure:

UNDERWAY UNDERWAY $4,081,000 $3,264,800
$816,200

Page 255 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

MUSCOGEE COUNTY

PROJECT: 350970- TYPE WORK: NEW CONSTRUCTION

FUND: STP

COLUMBUS TMA TIP # 98-SR-1660

LENGTH (miles I km) 2.1 13.38

DESCRPT: NEW ROAD/ MILLER TO BILLINGS RD & HOLLAND DR TO GATEWAY DR

EXIST. LANES: 00 PROPOSED LANES: 02

PE: 2001 . ROW: LOCL CST: 2002 FED Share: GA Share:

$5,000
$448,000 $358,400
$89,600

PROJECT: 351000- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

PE: 1996

COLUMBUS TMA TIP # 79-SR-2004

LENGTH (miles I km) 0.2/0.32

ROW: LOCL

DESCRPT: SR 22SP/MACON RD/WYNNTON AT BROWN AVENUE AND PEACOCK AVENUE

CST: 200 I

FED Share:

GA Share:

UNDERWAY
$587,000 $469,600 $1 17,400

PROJECT: 351010- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP #

LENGTH (miles I km) 0.67 I 1.08

DESCRPT: CS 1618/WHITTLESEY ROAD FROM WHITESVILLE RD TO VETERANS PKWY

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1998 ROW: LOCL CST: 2003 FED Share: GA Share:

UNDERWAY
$1,828,000 $1,462,400
$365,600

PROJECT: 351020- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP # 86-SR-2002

LENGTH (miles I km) 0.5 10.81

DESCRPT: CS'1425/54TH STREET FROM CHUMAR DR TO VETERANS PARKWAY

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1998 ' ROW: LOCL CST: 2002 FED Share: GA Share:

UNDERWAY
$685,000 $548,000 $137,000

PROJECT: 351190- TYPE WORK: WIDENING

COLUMBUS TMATIP # BV-2002

LENGTH (miles I km)

DESCRPT: BUENA VISTA ROAD FM 1-185 TO DOGWOOD DRIVE

EXIST. LANES: 05 PROPOSED LANES: 06

FUND: STP 0.41/0.66

PE: 2001 ROW: LOCL CST:

$\00,000
.-
AFTER 2003

PROJECT: 35Y780- TYPE WORK: WIDENING

FUND: STP

COLUMBUS TMA TIP # 79-SR-2003

LENGTH (miles I km) 0 10.00

DESCRPT: FORREST RD FM MACON RD TO WOODRUFF FARM RD- Q23 $ 350780

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 350780-

PE: 1992 ROW:200J CST: NONE

UNDERWAY $3,828,000

PROJECT: 35Y785- TYPE WORK: WIDENING

' FUND: STP

COLUMBUS TMA TIP # 79-SR-2016

LENGTH (miles Ikm) 0/0.00

DESCRPT: FORREST RD FM WOODRUFF FARMIFLOYD TO SCHATULGA-Q23 $; 350785

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 350785-

PE: 1992 ROW: 2001 CST: NONE

UNDERWAY $8,750,000

PROJECT: 371762- TYPE WORK: BICYCLE/PED. FACILITY

FUND:STP

COLUMBUS TMA TIP # 98-NRVRWLK

LENGTH (miles I km) 0/0.00

DESCRPT: RIVERWALK TRAIL ALONG CHATTAHOOCHEE RIVER PHASES 1&2

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

$2,500,0~0
$2,000,000
$500,000

Page 256 of336

---_._-- ._---

..._-_._--_._.._ . _ - - - - - _..__. _ - -

STATE TRANSPORTATION IMPROVEMENT PROGRAM'

9/21/00

MUSCOGEE COUNTY

PROJECT: 302005- TYPE WORK: CAPITAL

FUND: TRANSIT

PE:NONE

COLUMBUS TMA TIP #

LENGTH (miles / km) 0 /0.00

ROW: NONE

DESCRPT: TIRE LEASING; ENGINE REBUILD PROGRAM:.TRANSMISSION REBUILD

CST: 2001

FED Share:

GA Share:

OTH Share:

PROJECT: 302007- TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles/ km)

DESCRPT: TRANSIT CAPITAL ITEMS

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002.

FED Share:

GA Share:

OTHShare:

PROJECT: 302010- TYPE WORK: CAPITAL COLUMBUS TMA TIP # DESCRPT: TRANSIT COACHES

LENGTH (miles / km)

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

OTH Share:

PROJECT: 302011- TYPE WORK: CAPITAL COLUMBUS TMA TIP # DESCRPT: TRANSIT COACHES

LENGTH (miles / km)

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

OTH Share:

PROJECT: 3V7038- TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles / km)

DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2001

FED Share:

GA Share:

$1,199,000 $1,066,000
$133,000 $133,000
$1,235,000 $1,098,000
$137,000 $137,000
$450,000 $400,000
$50,000 $50,000
$450,000 $400,000
$50,000
$50,000
~
$43,000 $43,000 $11,000

PROJECT: T000134 TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 COLUMBUS SECTION 5307 CAPITAL

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTH Share:

PROJECT: TOOOl35 TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles / km) .

DESCRPT:FY 2003 COLUMBUS SECTION 5309. CAPITAL

FUND: TRANSIT . PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Share:

OTHShare:

PROJECT: TOOOl36 TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles / km)

DESCRPT: FY 2003 COLUMBUS SECTION 5310 CAPITAL

FUND: TRANSIT

PE:NONE

0/0.00

ROW: NONE

CST: 2003

FED Share:

GA Shores

$4,046,000 $3,596,000
$450,000 $450,000
$450,000 $400,000
$50,000 $50,000
$47,000 $47,000 $12,000

Page 257 of336

__ .... ..._---------

_-_._ .. ..:--_......,

.. -'.---_.,---_.

STATE TRANSPORTATION IMPROVEMENT PROGRAM

.... .._-"",.,,...... ..__._ . ."'.. ...-.:"',..,.. ..._ - - ""'.,....,..~

~-----_

~~..-

~-_

9121100
----.,;--"'------;-~,.~,.-------_

MUSCOGEE COUNTY

PROJECT: T000226 TYPE WORK: CAPITAL

COLUMBUS TMA TIP #

LENGTH (miles / km)

DESCRPT: FY 2002 COLUMBUS SECTION 53 I0 CAPITAL

FUND: TRANSIT

PE: NONE

0/0.00

ROW: NONE

CST: 2002

FED Share:

GA Share:

$45,000 $45,000 $11,000

Page 258 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

NEWTON COUNTY
PROJECT: 0000168 TYPE WORK: SIDEWALKS LENGTH (miles I km)
DESCRPT: COVINGTON WEST STREET STREETSCAPE

FUND: STP 010.00

PE: LOCL ROW: LOCL .CST: 2001 .
FED Share:

PROJECT: 0000842 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles I km)
DESCRPT: SR I 62/SALEM ROAD AT SPRING ROAD/CR 33 LUMP SUM PROJECT

FUND:STP 0.32/0.52

OTH Share:
PE: 2001 ROW: LOCL CST: 2003 FED Share: GA Share:

$164,000 $131,000
$33,000
$22,000
$328,000 $295,200
$32,800

PROJECT: 210530- TYPE WORK: INTERCHANGE

FUND: 1M

LNGTH(mileslkm) 0.71/1.14

DESCRPT: 1-20 @ SR 142-12/COVINGTON (INCL RELOC OF FRONTAGE RD/CR 72)

ASSOCIATED PROJECTS: 231220-

PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $5,250,000 $4,223,000 $3,800,700 $422,300

PROJECT: 210810- TYPE WORK: WIDENING

FUND:NHS

LENGTH (miles I km) 1.8212.93

DESCRPT: 1-20 FM ALCOVY ROAD INCL INTERCHANGE TO SR 142 IN COVINGTON

EXIST. LANES: 04 PROPOSED LANES: 06

PE:1998 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $110,000
$9,050,000 $7,240,000 $1,810,000

PROJECT: 210860- TYPE WORK: LIGHTING LENGTH ('~iles I km)
DESCRPT: 1-20 AT EXIT 45AJALCOVY ROAD -- Lk;HTING LUMP SUM PROJECT

FUND:NHS 0.48/0.77

PE: 1997 ROW: NONE CST: 2003 FED Share: GA Share:

UNDERWAY
$338,000 $270,400 $67,600

PROJECT: 210870- TYPE WORK: LIGHTING

FUND:NHS

LENGTH (miles I km) . 0.24/0.39

DESCRPT: 1-20 AT EXIT 46/SR 142 -- LIGHTING

LUMPSUM PROjECT

PE: 1997 ROW: NONE CST: 2003 FED Share: GA Share:

'UNDERWAY
$266,000 $212,800
$53,200

PROJECT: 210880- TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles I km)

I 11.61

DESCRPT: 1-20 SAFETY UPGRADES @ 2 LOCINEWTON & I LOC/WALTON

ASSOCIATED PROJECTS: 21088X-

PE: 1997 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$8,663,000 $7,796,700
$866,300

PROJECT: 231210- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 4 16.44

DESCRPT: SR I 621SALEM RD FM BROWN BRDGE RD TO S/FLAT SHOALSIROCKDALE

EXIST. LANES: 02 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 23121 X-

PE: 1999 ROW: 2001 CST:

UNDERWAY $600,000
AFTER 2003

Page 259 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

_ _ _ _._.

9/21/00

..*

.._. ,._ ....., > ' < ' _ ' " _..O'<...._

..... . . . , . . , . ,. . . . . _ _ ... _ _ - . .. . _ _ ' " -"':,.~

,_.""":_,......-~,,:~

~

..........._ ,

_

NEWTON COUNTY

PROJECT: 231220- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 1.07/1.72

DESCRPT: SR 142 FM S OF SR 12/US 278 NORTH TO N OF CR 75 IN COVINGTON

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 210530-

PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $293,000
$3,750,000 $3,000,000
$750,000

PROJECT: 231625- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 1.8/2.90

DESCRPT: SR 81 PASSING LANE SW OF PORTERDALE FM MP 3.4 TO MP 5.2

EXIST. LANES: 02 PROpOSED LANES: 04

PE: 1999 ROW: 2001 CST:

UNDERWAY $100,000
AFTER 2003

PROJECT: 231630- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 12/US 278 FM JUST E OF MILL ST E TO SR 142/S-774 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 231635-

FUND: STP 3.45 /5.55

PE: 1998 ROW: 2003 CST:

UNDERWAY $367,000
AFTER 2003

PROJECT: 231690- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 3.3 /5.31

DESCRPT: SR 36 @ 3 LOCATIONS BETWEEN BUTTS COUNTY LINE AND CR 188

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1999 ROW: 2001 CST: 2003 FED Share: GA Shure:

UNDERWAY $28,000
$3,810,000 $3,048,000
$762,000

PROJECT: 232330- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.8 /1.29

DESCRPT: SR 36 AT FLAT SHOALS/STEELE RD/CR 18/ & HENDERSON MILLlCR506

LUMP SUM PROJECT

PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:

UNDERWAY
$341,000 $306,900 $34,100

PROJECT: 242230- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 142 FM 1-20 TO ALCOVY RD IN COVINGTON EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 1.21 /1.95

PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $100,000
$3,996,000 $3,196,800
$799,200

PROJECT: 245190- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.56/0.90

DESCRPT: SR 212 @CR 191N OAK HILL-INTERSECTION IMPROVEMENTS

PE: 2000 ROW: 2003 CST:

UNDERWAY $304,000
AFTER 2003

PROJECT: 245380- TYPE WORK: REPLACE BRIDGE' LENGTH (miles / km)
DESCRPT: SR 20@ SOUTH RIVER NEWTON-HENRY CO LINE
ASSOCIATED PROJECTS: 24538X-

FUND: BRIDGE

PE: 2001

0.27/0.43

ROW: 2002

CST: 2003

FED Share:

GA Share:

$32,000 $10,000 $1,374,000 $1,099,200 $274,800

Page 260 of336

"'~--_""'

STATE TRANSPORTATIONIMPROVEMENT PROGRAM

9/21/00
t<IlI"l\:t _ _,_~~"_,,,,,,,,~_~,,_,,,,,~_,,,,,,,,,,,,,,,,,,,,,,.,,,,,_,,,,,,,,,,,,,,1I"W'_'_"""_""'

. _...'

,~_...__ .....,....,.:..._,r.<. t, ~ . . . . "._.~~..,,..~.,

NEWTON COUNTY
PROJECT: 271304- TYPE WORK: LANDSCAPING LENGTH(miles / km)
DESCRPT: STREETSCAPES IN THE CITY OF COVINGTON-PHASE I

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$959,000 $767,000

OTH Share:

PROJECT: 33317X- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0/0.00

DESCRPT: SR 36 @ SOUTH RIVER AT BUTTS-NEWTON CO L1NEIS~E B,UITS 333172

PE:NONE ROW: NONE CST: NONE

$192;000

ASSOCIATED PROJECTS: 333172-

; \-

j , ,"

~

I 'I

Page 261 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

__)

---"--------_._ -_._--_.-_. .- ... 9/21/00 . ~,-~-_.----".

-------"

OCONEE COUNTY

PROJECT: 0000169 TYPE WORK: LANDSCAPING

ATHENS TIP #

LENGTH (miles I km)

DESCRPT: US 441/SR 53 INTERCHANGE LANDSCAPING

FUND: STP
0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$75,000 $60,000

OTH Share:

PROJECT: 122660- TYPE WORK: WIDENING

FUND: STATE

ATHENS TIP # 11-05(2)

LENGTH (miles I km), 8.74/14.07

DESCRPT: SR 24/US 44 I FM N OF APALACHEE RIVER TO WATKINSVILLE BP

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1994 ROW: 2003 CST:

$15,000
UNDERWAY $3,664,000 AFTER 2003

PROJECT: 142060- TYPE WORK: WIDENING

FUND: STP

ATHENS TIP # 11-05

LENGTH (miles / km) 1.8512.98

DESCRPT: SR 53 FM HOG MTN RD (CR 274) TO SR I5/US 441 IN WATKINSVILLE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 141980-

PE: 1998 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $1,100,000 $3,500,000 $2,800,000
$700,000

PROJECT: 170543- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.2 /0.32

ROW: LOCL

DESCRPT: CR 121/HALE ROAD@GREENBRIARCREEK 4.5 MI SE OF FARMINGTON

CST: 2002

FED Share:

GA Share:

UNDERWAY
$393,000 $314,400 $78,600

PROJECT: 171460- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

ATHENS TIP # V-02

LENGTH (miles I km) 2.5/4.03

DESCRPT: SIMONTON BRIDGE ROAD FM WATKINSVILLE TO CLARKE COUNTY

ASSOCIATED PROJECTS: 141970-

PROJECT: 171574- TYPE WORK: SIDEWALKS

FUND: STP

ATHENSTlP#V-05

LENGTH (mi/eslkm) 4.9/7.89

DESCRPT: STREETSCAPES FOR BUTLER'S CROSSING IN WATKINSVILLE

PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PE: 2003 ROW: LOCL CST: 2003 FED Share:

PROJECT: 245130- TYPE WORK: REPLACE BRIDGE

FUND: STP

LENGTH (miles / km) 0.43 10.69

DESCRPT: SR 15 @ ROSE CREEK BETWEEN GREENSBORO & WATKINSVILLE

OTH Share:
PE: 1997 ROW: 2001 CST:

$394,000 $315,000
$79,000
$23,000
$227,000 $182,000
$45,000
UNDERWAY $50,000
AFTER 2003

Page 262 of336

STATE TRANSPORTAT.ION IMPROVEM, ENT PROGRAM

_ _ _ _ _ _ _ _ _._._._ _,

"_'_00 _.

9/21/00



. _ ,_ . _

~

. _.,_

_ _..,

,

OGLETHORPE COUNTY
PROJECT: 222460- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 10 FM 10.2-12.2113.7-15.0115.3-16.2IWILKES: 0-1.715.5-7.q EXIST. LANES: 02 PROPOSED LANES: 03

FUND: STP 7.4 / I 1.91

PE: 1997 ROW: 2001 CST: .

UNDERWAY $100,000
AFTER 2003

PROJECT: 231910- TYPE WORK: NEW CONSTRUCTION

FUND: STP ..

LENGTH (miles / km) 6.3 /10. 14

DESCRPT: CRA WFORDILEXINGTON BYP FM E OF CR 26/SMOKEY RD SE TO SR 22

EXIST. LANES: 00 PROPOSED LANES: 04

PE: 1999 ROW: 2003 CST:

UNDERWAY $1,459,000 AFTE;R 2003

PROJECT: 232315- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.2 I /0.34

DESCRPT: SR 77@GOOSEPONDCREEK 14.5 MI NE OF LEXINGTON

PE: 1999 ROW: 2003
CST~

UNDERWAY $10,000
AFTER 2003

PROJECT: 245370- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 22 @ LONG CREEK 3.5 MI S OF LEXINGTON

FUND: BRIDGE 0.23 /0.37

PE:1999, ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 245371- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

.. LENGTH (miles / km). 0.23 /0.37

DESCRPT: SR 22 @ BIG CLOUDS CREEK 3.8 MI E OF SMlTHSONIA

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 245372- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

. LENGTH (miles / km) 0.24/0.39

DESCRPT: .SR 22 @ SOUTH FORK BROAD RIVER.4 MI NE 9F SMlTHSONIA

PE: 1999 , ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page 263 of336

---------_._--_.

- - - _.._----------_._._---

STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

PAULDING COUNTY
PROJECT: 621570- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 61 FM SR 120 CONN TO SR 6/DALLAS BYPASS EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 641830-

FUND: NHS 3.2 15.15

PE: 1996 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $3,500,000 $8,000,000 $6,400,000 $1,600,000

PROJECT: 631142- TYPE WORK: MINOR WIDEN & RESURF LENGTH (miles I km)

FUND: STP 10 00

DESCRPT: CR 440lCR 470lCR 441 FM CR 168 TO CR 226/PAULDING ..SEE POLK

ASSOCIATED PROJECTS: 631148-

PE:NONE ROW: NONE . CST: NONE

PROJECT: 632660- TYPE WORK: REPLACE BRIDGE LENGTH (mileslkm)
DESCRPT: SR 120 OVER LANE CREEK 2.3 MI SW OF DALLAS

FUND: BRIDGE

PE:1997

0.42/0.68

ROW: 2000

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY
$413,000 $330,400
$82,600

PROJECT: 632776- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles I km)
DESCRPT: SR 92 AT CR 283/BROWNSVILLE ROAD LUMP SUM PROJECT

FUND: STP 0.54/0.87

PE: 1999 ROW: 2001 CST: 2001 FED Share: GA Share:

UNDERWAY $170,000 $403,000 $362,700 $40,300

PROJECT: 64Y830- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles I km) 0.29 10.47

DESCRPT: SR 61 FM CR 341 TO SR 6/DALLAS BYP & RR BR{FOR 31A $}/641830

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 641830-

PE: 1993 ROW: 2001 CST:

UNDERWAY $100,000
AFTER 2003

PROJECT: 670366- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles I km) 0.23/0.37

ROW: LOCL

DESCRPT: CR 842/0LD HARRIS ROAD@SOUTHERN RR (719808G) SE OF DALLAS

CST: 2003

FED Share:

GA Share:

OTH Share:

. UNDERWAY
$929,000 $743,200
$92,800 $93,000

.!:-
Page 264 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00.

PEACH COUNTY

PROJECT: 0000128 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles I km)

FUND: STP 0/0.00

DESCRPT: BYRON RAILROAD DEPOT MUSEUM/RAILROAD CABOOSE & CITY PARK

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000757 TYPE WORK: BARRIERS

WARNER ROBINS TIP # 2000( I)

LENGTH (miles I km)

DESCRPT: RICHARD RUSSELL PKWY NOISE BARRIERS

OTH Share:

FUND: STATE 0/0.00

PE: 1995 ROW: LOCL CST: 2001

GA Share:

$120,000 $96,000 $24,000
UNDERWAY $1,000,000
$1,000,000

PROJECT: 3 11540- TYPE WORK: INTERCHANGE

WARNER ROBINS TIP # WR 1-I 993( I)

LEN(iTH (miles I km)

DESCRPT: 1-75 @ SR 96

EXIST. LANES: 02 PROPOSED LANES: 04

. FUND: 1M I 11.61

PE: 1993 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY $4,444,000
$3,999,600 $444,400

PROJECT: 311700- TYPE WORK: INTERCHANGE

WARNER ROBINS TIP # WRI-1996(3)

LENGTH (mileslkm)

DESCRPT: 1-75 AT THE PROPOSED RICHARD RUSSELL PARK WAY

: EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 363760-

FUND:NHS 0.2/0.32
, '.

PE: 1995 ROW: 1999 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$3,900,000 $3,120,000
$780,000

PROJECT: 36313X- TYPE WORK: WIDENING LENGTH (miles I km)

FUND: ST.ATE 0 10.00

DESCRPT: SR 96 FM E OF FLINT RIV TO FT VALLEY BY/SR 49C & BRID/CRA WFD

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 363130-

PE:NONE ROW: NONE CST: NONE

c PROJECT: 363760- TYPE WORK: ,NEW CONSTRUCTION

FUND: STATE

WARNER ROBINS TIP # WR 1-1996(2)

LENGTH (miles I km) 5 18.05

DESCRPT: RICHARD RUSSELL PKWY FM E OF 1-75 TO CORDER RD/HOUSTON

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 36376X- 311700-

PE: 1995 ROW: LOCL CST: 2001
GA Share:'

UNDERWAY $11,843,000 $11,843,000

PROJECT: 363790- TYPE WORK: NEW CONSTRUCTION

FUND: STATE

LENGTH (miles I km) 0.55 10.89

DESCRPT: SR 894/UNIVERSITY BLVD FM 5R 49 TO ST COLLEGE DR-FT VALLEY

EXIST. LANES: 00 PROPOSED LANES: 02 .

PE:NONE ROW: 1997 CST: 2001
GA Share:

UNDERWAY $791,000
$791,000

PROJECT: 363820- TYPE WORK: WIDENING

FUND: STATE

LENGTH (mileslkm) 4.87/7.84

DESCRPT: SR 49C1FT VALLEY BYP FM BEVERLY RD NE TO SR 49 - ADD 2 LANES

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 2001 CST:

UNDERWAY $10,000
AFTER 2003

Page 265 of336

STATE TRA/ySPORTATION IMPROVEMENT PROGRAM
9/21/00

PEACH COUNTY

PROJECT: 363910- TYPE WORK: REALIGNMENT

FUND: NHS

LENGTH (miles / km) . 1.2/1.93

DESCRPT: 1-75 @SR49RELOCATE FRONTAGE RDS CHAPMAN RD & INDUST BLVD

PE: 2001 ROW: CST:

$151,000 AFTER 2003 AFTER 2003

Page 266 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

PICKENS COUNTY

PROJECT: 0000142 TYPE WORK: RICiHTS-OF-WAY LENGTH (miles / km)

FUND: STP 0 /0.00

DESCRPT: BURNT MOUNTAIN SCENIC PRESERVATION PR9PERTY ACQUISITION

PE:LOCL ROW: 2001 CST: NONE

$938,000

PROJECT: 621490- TYPE WORK: WIDENING LENGTH (miles / km)
.DESCRPT: SR 53 FM SR 515/APD TO CR 243/1NDUSTRIAL BLVD EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 1.4.12.25

PE: 1992 ROW: 2003 CST:

UNDERWAY $1,200,000 AFTER 2003

PROJECT: 621590- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) 2.36/3.80

DESCRPT: SR 53 - WB PASSING LNS EAST OF TATE MP 20.4-21.3 & 22.6-24.1

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 2000 ROW: 2001 CST: 2001 FED Share: GA Share:

UNDERWAY $0
$1,633,000 $1,306,400
$326,600

PROJECT: 621595- TYPE WORK: PASSING LANES

FUND: STP

LENfiTlI (miles / km) 2.94/4.73

DESCRPT: SR 53 - EB PASSING LNS EAST OF TATE MP 24.3-25.4 & 26.5-28.4

EXIST. LANES: 02 PROPOSED LANES: 03

PE:2000 ROW: 2002 CST:

UNDERWAY $175,000
AFTER 2003

PROJECT: 642140- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles / km) 0.2 /0.32

ROW: 2001

DESCRPT: SR 136 BRlDGE REPLACEMENT OVER TALKING ROCK CREEK N OF SR 53

CST: 2002

FED Share:

GA Share:

UNDERWAY $14,000
$466,000 $372,800
$93,200

Page 267 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

. PIERCE COUNTY
PROJECT: 0001115 TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: CR 191/BOWEN RD IN BLACKSHEAR@CSX# 637256R LUMP SUM PROJECT

FUND: STP 0/0.00

PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$100,000 $80,000 $20,000

PROJECT: 522340- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 6.9/1 1.11

DESCRPT: SR 38/US 84 FM CR I07/0FFERMAN TO S CITY LMTS SCREVEN/WAYNE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 52234X-

PE: 1993 ROW: 2001 CST:

UNDERWAY $1,667,000 AFTER 2003

PROJECT: 533 170- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.26/0.42

DESCRPT: SR 15 @ BIG SATILLA CREEK AT APPLING COUNTY LINE

ASSOCIATED PROJECTS: 533 I7X-

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 542370- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.4 /0.64

DESCRPT: SR 203/STRICKLAND STREET AT OLD ALMA ROAD/CR 309

PE: 2001 ROW: CST:

$10,000 AFTER 2003 AFTER 2003

(
Page 268 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9121100

PIKE COUNTY

PROJECT: 333110- TYPE WORK: INTERSECTION IMPROVEMENT

.

LENGTH (miles / km)

DESCRPT: SR 18/SR 109 AND SR 74 INTERSECTION IMPROVEMENT

FUND: STP 0.2/0.32

PE: 2000 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY

$547,000

~

$605,000

$484,000

$121,000

PROJECT: 333145- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 18 @ ELKINS CREEK .1 MI W OF ZEBULON

FUND: BRIDGE 0.24/0.39

PE: 1999 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 343385- TYPE WORK: REPLACE BRIDGE

I

LENGTH (miles / km)

DESCRPT: SR 109 @ ELKINS CREEK .5 MI E OF MOLENA

FUND: BRIDGE 0.24/0.39

PE: 1999 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

Page 269 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

POLK COUNTY
PROJECT: 0000115 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: DEPOT/HISTORIC DISTRICT OF CEDARTOWN

FUND:STP 0/0.00

PE:LOCL ROW: LOCL . CST: 2001 FED Share:

PROJECT: 0000116 TYPE WORK: SIDEWALKS LENGTH (miles / km)
DESCRPT: ROCKMART STREETSCAPE PROJECT

FUND: STP 0/0.00

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 620645- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 6.27/ 10.09

DESCRPT: SR 6 FM OLD CEDARTOWN RD/CR 193 E TO SR IOIlROCKMART/62Y645

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 62Y645-

OTH Share:
PE: 1992 ROW: 1997 CST: 2003 FED Shure: GA Share:

$655,000 $524,000
$131,000
$310,000 $248,000
$62,000 UNDERWAY UNDERWAY
$5,017,000 $4,013,600 $1,003,400

PROJECT: 62I43X- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: SR 113 FM TAYLORSVILLE CL TO CR 31/STILESBORO..SEE BARTOW

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 621430-

PE:NONE ROW: NONE CST: NONE

PROJECT: 621860- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles/ km) 5.75/9.26

DESCRPT: CEDARTOWN BYPASS WIDENING FM SR 100 N TO JUST S. OF CR 334

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 62Y860-

PE: 1995 ROW: 2001 CST:

UNDERWAY $845,000
AFTER 2003

PROJECT: 62Y645- TYPE WORK: WIDENING

FUND: HPP

LENGTH (miles / km) 6.27 / 10.09

DESCRPT: SR 6 FM OLD CR 193 E TO SR 101 - FOR HPP $ SEE 620645

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 620645-

PE: 1992 ROW: NONE CST: 2003 FED Share: GA Shure:

UNDERWAY
$4,490,000 $3,592,000
$898,000

PROJECT: 631148- TYPE WORK: MINOR WIDEN & RESURF

FUND: STP

LENGTH (miles / km) 6.53 / 10.51

DESCRPT: CR 440/470/441 FM CR 168 THRU PAULDING TO CR 226/0LD ATL HWY

ASSOCIATED PROJECTS: 631142-

PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $129,000
$3,099,000 $2,479,200
$619,800

PROJECT: 63114X- TYPE WORK: MINOR WIDEN & RESURF

FUND: STP

LENGTH (miles / km) 0/0.00

DESCRPT: CR 342/CR 440 FM CR 345/HARALSON TO CR I68/POLK-SEE HARALSON

ASSOCIATED PROJECTS: 631145-

PE:NONE ROW: NONE CST: NONE

Page 270 of336

STATE TRANSPORTATION IMPROVEMENT PRo,GRAM
9/21/00

POLK COUNTY
PROJECT: 641880~ TYPE WORK: TURN LANES LENGTH (miles / km)
DESCRPT: SR I BUSFM THORNTON AVE TO CEDARTOWN BYPASS

FUND: NHS 1.08/1.74

PE: 1994 ROW: 1999 CST: 2001 FED Share:

UNDERWAY UNDERWAY $1,271,000 $1,271,000

PROJECT: 670678- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE:2001

.. L.ENGTH (miles / km) 0.2 /0.32

ROW: LOCL

DESCRPT: CR 182/BETHLEHEM ROAD@FISH CREEK 5.7 MI W OF ROCKMART

CST: 2003

FEDShllre:

GA Share:

$19,000
$191,000 .$152,800
$38,200

.".

Page 2710/336 )

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

PULASKI COUNTY

PROJECT: 322180- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 9.5 /15.30

DESCRPT: SR 27/US 341 FM SR 230/HAWKINSVILLE E TO DODGE CO LINE

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 1994 CST: 2001
GA Share:

UNDERWAY UNDERWAY $18,670,000
$18,670,000

PROJECT: 333080- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 257 @ TEN MILE CREEK 3.5 MI NW OF FINLEYSON

FUND: BRIDGE

PE: 1999

0.22/0.35

ROW: 2001

CST: 2003

FED Share:

,GA Share:

UNDERWAY $10,000
$330,000 $264,000
$66,000

PROJECT: 343000- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.26 /0.42

DESCRPT: SR 230 @ BIG CREEK 5.6 MILES WEST OF HAWKINSVILLE

PE: 1995 ROW: 2001 CST:

UNDERWAY $50,000
AFTER 2003

Page 272 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

PUTNAM COUNTY

PROJECT: 0001077 TYPE WORK:' . INTERSECTION IMPROVEMENT

FUND: MIN. GUARAN PE: 2001

LENGTH (miles 1 km) 0.53/0.85

ROW: 2003

DESCRPT: SR 16 FM JEFFERSON AVE TO EAST OF S. GRAND AVE IN EATONTON

CST:

$49,000 $168,000 AFTER 2003

PROJECT: 222470- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 10.4 116.66

DESCRPT: SR 24/US 441 FM CR 245 TO EATONTON BYPASS @ US 129

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 22Y470-

PROJECT: 222580- TYPE WORK: WIDENING

FUND: STATE

.

LENGTH (miles 1 km) 9.04/14.55

DESCRPT:SR 24/US 441 FM EATONTON BP@CR 17/REIDS RD TO MORGAN CL

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 2003 CST:

UNDERWAY $2,489,000 AFTER 2003

PE: 1994 ROW: 2003 CST:

UNDERWAY $4,809,000 AFTER 2003

PROJECT: 231270- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles 1 km) 0.31 10.50

DESCRPT: SR 16 OVER THE OCONEE RIVER @ HANCOCK COUNTY LINE

PE: 1997' ROW: 2001 CST:

UNDERWAY $50,000
AFTER 2003

PROJECT: 23 1610- TYPE WORK: WIDENING

FUND: STP

LENGTH (mileslkm) 5.14/8.28

DESCRPT: SR 24/EATONTON BYPASS- REMAINING TWO LANES NORTHBOUND

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1995 ROW: 1999 CST: 2003 FED Share: GA Share:

UNDERWAY UNDERWAY ~ $2,426,000 $1,940,800
$485,200

PROJECT: 231620- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles 1km) 5.07 18.16

DESCRPT: SR 44 FOUR PASSING LANES NB & SB BETWEEN EATONTON & GRAY

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1998 ROW: 2001 CST:

UNDERWAY $100,000
AFTER 2003

PROJECT: 232295- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles 1km) 0.22/0.35

DESCRPT: SR 16@ ROOTY CREEK IN EAST EATONTON

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 245350- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 16 @ CROOKED CREEK 6 MI E OF EATONTON

FUND: BRIDGE

PE: 1999

0.22/0.35

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY , $10,000
$639,000 $511,200 $127,800

Page 273 of336

STATE TRANSPORTATION IMpJUivEMENT PROGRAM
9/21/00

PUTNAM COUNTY
PROJECT: 270760- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: CR 212/FH 24 SOUTH OF SR 24 @TOWN CREEK

FUND: BRIDGE

PE: 1996

0.4 /0.64

ROW: LOCL

CST: 2002

FED Share:

GAShare:

UNDERWAY
$515,000 $412,000 $103,000

PROJECT: 271130- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: MARTIN MILL RD/eR 29/FH 27 @ LITTLE RIVER

FUND: FOREST HWY PE: 1996

0.79/1.27

ROW: LOCL

CST: 200 I

FED Share:

UNDERWAY
$1,404,000 $1,404,000

Page 274 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

QUITMAN COUNTY

PROJECT: 431520- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.38/0.61

DESCRPT: SR SO/US 82 REALIGNMENT IN THE CITY OF GEORGETOWN

PE: 1996 ROW: 1998 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY
$2,000,000 $1,800,000
$200,000

. Page 275 of336

STATE TRANSPORTATION IMpROVEMENT PROGRAM
9/21/00

RABUN COUNTY
PROJECT: 0000306 TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 28 @ CHATIOOGA RIVER 13 MI NE OF CLA YTON

FUND: BRIDGE 0.24 10.39

PE: 2001 ROW: CST:

$66,000 AFTER 2003 AFTER 2003

PROJECT: 121950- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (mileslkm) 2.32/3.74

DESCRPT: SR 2 FM LAKE BURTON BRIDGE TO CHARLIE MTN RD/CR 94 & REALIGN

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1993 ROW: 1996 CST: 2001 FED Share: GA Share:

UNDERWAY UNDERWAY $8,444,000 $6,755,200 $1,688,800

PROJECT: 122320- TYPE WORK: WIDENING

FUND:NHS

LENGTH (mileslkm) 9.76/15.71

DESCRPT: SR 15IUS 441 FM N OF TALLULAH FALLS TO S CL OF CLAYTON

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 12Y320-

PE: 1993 ROW: 2002 CST:

UNDERWAY $19,863,000 AFTER 2003

PROJECT: 12Y090- TYPE WORK: WIDENING

FUND:NHS

LENGTH (miles 1 km) 0/0.00

DESCRPT: SR 15/US 441 FM NO. CUCLA YTON TO NC LINE-FOR FED PEII 22090

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 122090-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 171580- TYPE WORK: . REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: CR 80 AT TALLULAH RIVER 6.6 MI SW OF TIGER

FUND: BRIDGE

PE: 2000

0.22/0.35

ROW: LOCL .

CST: 2003

FED Share:

GA Share:

UNDERWAY
$547,000 $437,600 $109,400

" Page 276 of336

;----------~~~~~~---- -- - --------------~~- - - - - - - - - - - - - - - - - - - - ~ -
STATE TRANSPORTATIONIMPROVEMENTPROGRAM
9/21/00

RANDOLPH COUNTY

PROJECT: 422235- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 7.81 112.57

DESCRPT: SR IFM CARNEGIE VILULAH RD/CR 153 TO CUTHBERT BYPASS

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 431530- 42Y235-

PE: 1995 ROW: 2003 CST:

UNDERWAY $922,000
AFTER 2003

PROJECT: 42223X- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 0/0.00

DESCRPT: SR I FM BLUFFTON BYP TO CARNEGIE VILULAH RD/CR 153 - 422230

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 422230-

PE."NONE ROW: NONE CST: NONE

PROJECT: 422240- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 8.5/13.69

DESCRPT: SR IIUS 27 FR CUTHBERT BYP TO CR 116/LUSCIOUS QUEEN ROAD

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1993 ROW: 1999 CST: 2003
GA Share:

UNDERWAY UNDERWAY $21,020,000
$21,020,09

PROJECT: 422245- TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR IIUS 27 FR CR 116 TO LUMPI\IN BYPASS/& STEWART EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 42224X-

FUND: STATE 7.78 1 12.53

PE: 1996 ROW: 1999 CST: 2003
GA Share:

UNDERWAY UNDERWAY $19,840,000
$19,840,000

PROJECT: 431530- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

LENGTH (miles 1 km) 0.21 10.34

ROW: NONE

,DESCRPT: SR IIUS 27@ GEORGIA/ALABAMA RR 2.2 MI S. OF CUTHBERT

CST: 2002

FED Share:

ASSOCIATED PROJECTS: 422235-

GA Share:

UNDERWAY
~
$631,000 $504,800 $126,200

PROJECT: 432095- TYPE WORK: REPLACE BRIDGE

.

LENGTH (miles 1 km)

DESCRPT: SR 50/US 82 @ PACHITLA CREEK 4 MI E OF CUTHBERT

FUND: BRIDGE 0.21/0.34

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 442955- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 216 @CARTER CREEK 4.6 MI S OF CUTHBERT

FUND: BRIDGE 0.22/0.35

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: M000337 TYPE WORK: SHOULDER WORK LENGTH (miles / km)
DESCRPT: SR 266 FM CLAY CO LN TO SR 50 LUMP SUM PROJECT

FUND: STP 11.2 118.06

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$657,000

$525,600

..

$131,400

Page 277 of336

---------

_._-,-_ __ STATE TRANSPORTATION IMPROVEMENT PROGRAM

--_._---_.. .. _~--._--_

_--. .."..

9/21/00
.

---------_-.,..------

TERRELL COUNTY

PROJECT: 0000452 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.22 /0.35

DESCRPT: CR 1M/SASSER-HEROD ROAD @BRANTLEY CREEK WEST OF SASSER

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 0000453 TYPE WORK: .REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.22/0.35

DESCRPT: CR 1M/SASSER-HEROD ROAD @ CHICKASA WHATCHEE CREEK

'-

PE: 2001 ROW: LOCL CST:

$20,000 AFTER 2003

PROJECT: 0000454 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2001

LENGTH (miles / km) 0.2 /0.32

ROW: LOCL

DESCRPT: CR I i/BELLFLOWER ROAD @ HEROD CREEK 3.5 MI SW OF DA WSON

CST: 2003

FED Share:

GA Share:

$20,000
$220,000 $J76,000
$44,000

PROJECT: 431410- TYPE WORK: MINOR WIDEN & RESURF

FUND: STP

LENGTH (miles / km) 4.617.41

DESCRPT: SR 49 FM SR 45 TO SUMTER COUNTY LINE & CORRECT HORIZ ALIGN.

ASSOCIATED PROJECTS; 43 J41X-

PE: 2000 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page 301 of336

STATE TRANSPORTAI'IONIMPROVEMENT PROGRAM

---_._-~-------~----

9/21/00

_ _ _ _ _ _ _ _ u .. ~_.~,

THOMAS COUNTY

PROJECT: 0000814 TYPE WORK: RR XING LENGTH (miles I km)

FUND: STP 0 10.00

DESCRPT: CR I38/0LD CASSIDY RD IN THOMASVILLE@AGLF# 637024B

LUMP SUM PROJECT

PE:NONE ROW: NONE CST: 2001 FED Share; GA Share:

..

_

$100,000 $80,000 $20,000

PROJECT: 421970- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1992

LENGTH (miles I km) I I 1.61

ROW; 2001

DESCRPT: SR 38/US 84 BUS @ GA-FLA RAILNET INC NWITHOMASVILLE

CST: 2001

FED Share:

GA Share:

UNDERWAY $50,000
$4,126,000 $3,300,800
$825,200

PROJECT: 431150- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (mileslkm) 0.510.81

ROW: LOCL

DESCRPT: CR 299 @ BIG CREEK APPROX 3 MI E OF JCT SR I (I /MITCHELL CO

CST: 2001

FED Share:

ASSOCIATED PROJECTS: 43115X-

GA Share:

UNDERWAY
$501,000 $400,800 $100,200

PROJECT: 431152- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles I km) 0.2 10.32

ROW: LOCL

DESCRPT: CR 299 @ LITTLE CREEK APPROX 3 MI E OF JCT SR III & MITCHELL

CST: 2001

FED Share:

ASSOCIATED PROJECTS: 431152-

GA Share:

UNDERWAY
$334,000 $267,200
$66,800

PROJECT: 431670- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles I km) 3.77 16.07

DESCRPT: SR 35/WEST THOMASVILLE BYP FM SR 35BU N TO SR 38/US 84

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 43Y670-

PE: 1995 ROW: 2002 CST:

UNDERWAY $100,000
AFTER 2003

PROJECT: 442800- TYPE WORK: RR XING LENGTH (mileslkm)
DESCRPT: SR 188 @ SR 3 & GNFLA RAILNET INC CROSS REAL

FUND: STP 0.2/0.32

PE: 2000 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $2,000 .
$256,000 $204,800
$51,200

PROJECT: 442965- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (mileslkm) 0.21/0.34

DESCRPT: SR 33 @ REEDY CREEK APP .8 MI S OF PAVO

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003 .

PROJECT: 471436- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles I km)
DESCRPT: MULTI-USE FACILITIES IN DOWNTOWN THOMASVILLE

FUND: STP 010.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

$1,250,000 $1,000,000
$250,000

Page 302 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

fj/21/00

,

n_

....... ,.__

~ l'M'"

l'

._,.... !_""'_""'

.......~..,.

.._"'__ .... ........ ~,_,

. _ , . " ~ , ~ ._.__,,.....""_~,

x _ _ ._,"--"'",..

TIFT COUNTY
PROJECT: 0000087 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles / km)
DESCRPT: GEORGIA AGRIRAMA RAILROAD IN TIFTON

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$313,000 $250,000

PROJECT: 0000088 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

LENGTH (miles / km) , 0 /0.00

DESCRPT: TIFTON MULTI-PHASED PED SAFETY & DOWNTOWN BEAUTIFICATION

OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:

$63,000
$518,000 $414,000

PROJECT: 0000089 TYPE WORK: LANDSCAPING

FUND: STP

LENGTH (miles / km) 0/0,00

DESCRPT: TIFTON MULTI-PHASED BEAUTIFICATION @ 1-75& HWY 41

OTHShare:
PE: LOCL ' ROW: LOCL CST: 2001 FED Shure:

$104,000
$88,000 $70,000

.PROJECT: 0001117 TYPE WORK: RR XING , LENGTH (miles / km)
DESCRPT: CR 36/MT ZION RD IN CHULA @ NS # 723696S ' LUMP SUM PROJECT

FUND: STp 0/0,00

OTHShare:
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$18,000
$100,000 , $80,000 $20,000

PROJECT: 0001257 TYPE WORK: ,BRIDGES LENGTH (miles / km)
DESCRPT: 1-75 AT ADCOCK RD/CR 185 - BRIDGE REPAIR LUMP SUM PROJECT

FUND: STATE 0.1/0.16

PE:NONE ROW: NONE CST: 2001

GA Shure:

$300,000 $300,000

PROJECT: 410240- TYPE WORK: WIDENlNq

FUND: NHS

.LENGTH (miles / km) 8/12.88

DESCRPT: 1-75 FM N CITY LIMITS OF TIFTON TO TURNER COUNTY LINE-PH I

EXIS~. LANES: 04 PROPOSED LANES: 06

PE: 1986 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
, $33,260,000 $26,608,000
$6,652,000

PROJECT: 41053X- TYPE WORK: WIDENING

FUND:NHS

LENGTH (miles / km) 0/0.00

.: DESCRPT: 1-75 FM CR 246/COOK TO CR 2041TIFT/ SEE COOK COUNTY- 410530

EXIST. LANES: 04 PROPOSED LANES: 06

ASSOCIATED PROJECTS: 410530-

PE:NONE ROW: NONE CST: NONE

PROJECT: 422320- TYPE WORK: MEDIAN WORK

FUND: NHS

LENG'rH (miles / km) 0.76/1.22

DESCRPT: SR 520/US 82 FM MAGNOLIA DR EAST TO CENTRAL AVEITIFTON

PE: 1996 ROW: 1999 CST: 2002, FED Share: GA Share:

,UNDERWAY UNDERWAY
$1,009,000 $807,200 $201,800

Page 303 of336

,

~

STATE TRANSPORTATION IMPRlJVEMENT PROGRAM

9/21/00

IIt

~ _ _ ...."" ......, _... _

....

y



~.._ _

TIFT COUNTY

PROJECT: 431500- TYPE WORK: BRIDGE REHAB

FUND: STP

LENGTH (miles I km) 0.05/0.08

DESCRPT: SR 7/US 411 SOUTH MAIN .STREET OVER LITTLE RIVER TRIBUTARY

PE: 1997 ROW: 2001 CST: 2002 FED Share: GA Share:

UNDERWAY $1,000
$148,000 $118,400
$29,600

PROJECT: 431700- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

PE: 1997

LENGTH (miles I km) 0.24 10.39

ROW: 1999

DESCRPT: SR 35/US 319 OVER ALAPAHA RIVER @TIFT-IRWIN COUNTY LINE

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY $1,269,000 $1,015,200
$253,800

PROJECT: 432112- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles I km) 0 10.00

DESCRPT: SR 125 @ NEW RIVER BERRIEN-TIFT CO LIN EISEE BERRIEN 43211 I

ASSOCIATED PROJECTS: 432111-

PE:NONE ROW: NONE CST: NONE

PROJECT: 450560- TYPE WORK: WIDENING

.FUND: STP

LENGTH (milesI km)

J 11.61

DESCRPT: VIRGINIA AVE/CS 746 IN TIFTON FM SR 520/US 82 N TO 8TH ST

EXIST. LANES: 02 PROPOSED LANES: 04

PE:2001 ROW: LOCL CST:

$267,000 AFTER 2003

PROJECT: M000502 TYPE WORK: MINOR WIDEN & RESURF

FUND: 1M

LENGTH (milesI km) 6.3 110.14

DESCRPT: SR 401/1-75 FM N OF OAKRIDGE RD TO N OF BRIDGE OVER SR 7

LUMP SUM PROJECT

PE.NONE ROW: NONE CST: 2001 FED Share: GA Share:

$4,142,000 $3,313,600
$828,400

Page 304 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

,

,

9/21/00

TOOMBS COUNTY
PROJECT: 0000077 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: VIDALIA DOWNTOWN STREETSCAPE PHASE 2

FUND:STP 0/0,00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 522130- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles / km) 9.7 /15.62

DESCRPT: SR 4/US I FM LYONS CL TO SOUTH CLiOAK PARK IN EMANUEL.CO

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 52213X- 52Y130-

PE: 1993 ROW: 2002 CST: 2003
GA Share:

$500,000 $400,000
$100,000
UNDERWAY $1,455,000 $12,034,000
$12,034,000

PROJECT: 522320- TYPE WORK: NEW CONSTRUCTION

FUND: STP

LENGTH (miles / km} 2.15/3.46

DESCRPT: SR 30 FM W OF SUNSET DR TO BROADFOOT ST & 1-WAY PAIR/VIDALIA

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 1998 CST: 2002 FED Share: GA Share:

UNDERWAY UNDERWAY $3,981,000 $3,184,800
, $796,200

PROJECT: 52Y I80- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 4/US I FM SR 56 TO SR 29 - FOR FED PE; 522180 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 522180-

FUND:NHS 0/0.00

PROJECT: 52Y190- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 4 FM SR 29 TO S CLiL YONS - FOR FED PE; 522190 EXIST.' LANES: 02 PROPOSED LANES: 05 ASSOCIATED PROJECTS: 522190-

FUND:NHS 010.00

PE: 2001 ROW: NONE CST: NONE
PE: 2001 ROW: NONE CST: NONE

$1,000
-
$1,000

PROJECT: 52Y200- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 4/LYONS FM S CTY LMTS TO N CTY LMTS- FOR FED PE; 522200

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 522200-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 52Y220- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 0/0.00

DESCRPT: SR 4/US 1 FM PLANT HATCH RD TO SR 56/APPLING - FOR FED PE;

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIA TED PROJECTS: 522220-

PE: 2001 ROW: NONE CST: NONE

$1,000

PROJECT: 542415- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.24 /0.39

DESCRPT: SR 56 @ ROCKY CREEK 13 MI SE OF LYONS

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003.

Page 305 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

TOOMBS COUNTY
PROJECT: 542416- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 147@COBB CREEK 17 MI S OF LYONS

FUND: BRIDGE 0.23/0.37

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT: 55061X TYPE WORK: TURN LANES

FUND: STP

LENGTH (miles I km) 0 10.00

DESCRPT: SR 292 IMPROVE FM MORN'SIDE TO LOWERY & TURN LNS ISEE 550610

ASSOCIATED PROJECTS: 550610-

PE:NONE ROW: NONE CST: NONE


Page 306 of336

STATE TRANSPORTATION IMl'ROVEMENT PROGRAM
9/21/00

TOWNS COUNTY

PROJECT: 000030 I TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

. LENGTH (miles / km) 0.22 /0.35

DESCRPT: SR 17- SR 75 @ HIA WASSEE RIVER 6.5 MI S OF HIAWASSEE

PE: 2001 ROW: ' CST:

$33,000 AFTER 2003 AFTER 2003

PROJECT: 0000302 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.22 /0.35

DESCRPT: SR 17- SR 75 @HIAWASSEE RIVER 3.6 MI S OF, HIAWASSEE

PE: 2001 ROW: CST:

$20,000 AFTER 2003 AFTER 2003

PROJECT: 0000303 TYPE WORK: REPLACE BRIDGE ,

FUND: BRIDGE

LENGTH (miles / km} 0.22/0.35

DESCRPT: SR 2/US 76 @ HIGHTOWER CREEK 6.1 MI E OF HIAWASSEE

PE: 2001 ROW: CST:

$40,000 AFTER 2003 AFTER 2003

PROJECT: 0000304 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

t

LENGTH (miles / km) 0.22/0.35

DESCRPT: SR 66 @ BRASSTOWN CREEK .5 MI NW OF YOUNG HARRIS

PE: 2001 ROW: CST:

$40,000 AFTER 2003 AFTER 2003

PROJECT: 0000305 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.22/0.35

DESCRPT: SR 66 @ CROOKED CREEK 3.2 MI NW OF YOUNG HARRIS

PE:2001 ROW: CST:

$66,000 AFTER 2003 AFTER 2003

PROJECT: 122230- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

LENGTH (miles I km) 0.5/0.81

ROW: 2001

DESCRPT: SR 2IUS 763 MILES SE/f-I1AWASSEE @ HIA WASSEE RIVER

CST: 2001

FED Share:

GA Share:

UNDERWAY $0
$596,000 $476,800 $119,200

PROJECT: 132710- TYPE WORK: WIDENING

FUND: APD

LENGTH (miles / km) 1.2 /1.93

DESCRPT: SR 515 FM SR 2 NORTH OF HIA WAS SEE TO THE NORTH CAROLINA LINE

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1998 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $1,200,000 $848,000 $678,400 $169,600

"

Page 307 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

~

9/21/00

"'''''-''_ _'''4A

'_._ " "

.......

....._ . _..._ "'_"'~'''''''"_'''~

....._ ...,._ _'''',.

TREUTLEN COUNTY
PROJECT: 0000131 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: SOPERTON STREETSCAPE

FUND:STP 0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 21095X- TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: 1-16 SAFETY UPGRADES @ SR 199 IN LAURENS & SR 29 IN TREUTLEN

OTH Share:
PE:NONE ROW: NONE CST: NONE

$106,000 $85,000
$21,000

ASSOCIATED PROJECTS: 2 I0950-

PROJECT: 231700- TYPE WORK: . PASSING LANES LENGTH (miles / km)
DESCRPT: SR 29 NB MP 4.95-6.051 SB MP 7.0-8.1 EXIST. LANES: 02 PROPOSED LANES: 03

FUND:STP 2.213.54

PE: 2000 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $5,000
$1,030,000 $824,000 $206,000

PROJECT: 245360- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.27/0.43

DESCRPT: SR 46 @ OCONEE RIVER OVERFLOW 7.6 MI SW OF SOPERTON

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page 308 of336

,----------------------------------------~-~-

~ -~~

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

TROUP COUNTY

PROJECT: 0000117 TYPE WORK: SIDEWALKS

DESCRPT: LAGRANGE STREETSCAPE

LENGTH (miles / km)

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000118 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

.

LENGTH (miles / km) 0/0.00

DESCRPT: YOUNG'S MILL BRIDGE PED/BIKE TRAIL & STREETSCAPING

OTH Share:
'PE: LOCL ROW: LOCL . CST: 20,01 FED Share:

PROJECT: 310730- TYPE WORK: INTERCHANGE

FUND: NHS

LENGTH (miles / km) 0.85/1.37

DESCRPT: 1-185 CONN @ 1~85 & 1-1851 INTERCHANGE CONSTRUCTION

OTH Shure:
PE: 1993 ROW: 2001 CST:

ASSOCIATED PROJECTS: 362910-

$1,125,000 $900,000
$225,000
$191,000 $153,000
$38,000 UNDERWAY $1,437,000 AFTER 2003

PROJECT: 321715- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles/km) 3.05/4.91

DESCRPT: SR 14/US 29 FM CR 403/UPPER GLASS BRIDGE TO OLD VERNON RD

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992' ROW: 2001 CST:

,UNDERWAY $2,454,000 AFTER 2003

PROJECT: 321720- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR I @ UNNAMED TRIBUTARY TO WEST POINT LAKE EXIST. LANES: 02 PROPOSED LANES: 04

FUND: BRIDGE

PE: 1991

0.3/0.48

R.OW: 2001

CST: 2001

FED Share:

GA Share:

UNDERWAY $200,000 $920,000 $736,000 $184,000

PROJECT: 322230- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 14 NB & SB FM MP 3.87-5.371 NB & SB MP 7.07-8.41 EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 2.84/4.57

PE: 1992 ROW: 2002 CST:

UNDERWAY $40.0,000
AFTER 2003

PROJECT: 322240- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 109 FM 1-85 TO 1-185 INCL 1-85 RAMP EXIST. LANES: 02 PROPOSED LANES: 05

FUND: STP 0.8/1.29

PE: 1992 ROW: 2001 CST:

UNDERWAY $120,000
AFTER 2003

PROJECT: 322250- TYPE WORK: WIDENING

FUND: NHS

LENGTH (miles / km) 1.42 /2.29

DESCRPT: SR I/US 27/LAGRANGE FM AUBURN ST TO SR 219/MORGAN ST

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 1992 ROW: 2002 CST:

UNDERWAY $12,725,000 AFTER 2003

Page 309 of336

,-
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

TROUP COUNTY

PROJECT: 343190- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles 1 km) 0.21 10.34

ROW: LOCL

DESCRPT: CS 769IJEFFERSON STREET @ CSX RAILROAD IN WEST LAGRANGE

CST: 2002

FED Share:

GA Share:

UNDERWAY
$710,000 $568,000 $142,000

PROJECT: :343455- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2001

LENGTH (mile's 1 km) 0.3 10.48

ROW: LOCL

DESCRPT: CS 10811GREENVILLE STREET@CSXRAILROAD IN EAST LAGRANGE

CST: 2002

FED Share:

GA Share:

OTH Share:

PROJECT: 351170- TYPE WORK: TURN LANES

FUND: STP

LENGTH (miles 1 km) . 0.63 11.0 I

DESCRPT: 'SR 14/US 29 LEFT TURN LANE FROM MEADOW WAY DR TO SR 14 SPUR

PE: 1997 ROW: 2001 CST: 2001 FED Share: GA Share:

$232,000
$2,579,000 $2,063,200
$257,800 $258,000
UNDERWAY $500,000
$1,160,000 $928,000 $232,000

PROJECT: 362910- TYPE WORK: NEW CONSTRUCTION

FUND: NHS

LENGTH (mileslkm) 5.53/8.90

DESCRPT: 1-185 CONN FM 1-185 @ 1-85 TO SR I/US 27 S OF BEECH CREEK

EXIST. LANES: 00 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 310730- 36Y9JO-

PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:

UNDERWAY $5,170,000 $10,699,000 $8,559,200 $2,139,800

PROJECT: 36293X- TYPE WORK: WIDENING

FUND: HPP

LENGTH (miles 1 km) 0/0.00

DESCRPT: SRllUS 27 FM SR 54ITROUP TO PAITERSON/HEARDISEE 362930

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 362930-

PE:NONE ROW: NONE CST: NONE

PROJECT: 371390- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

LENGTH (mileslkm) 0.51/0.82
DESCRPT: CR 282/YOUNGS MILL RD FM CAMP DR OVER BEECH CK to EXIST RDWY

ROW: LOCL CST: 2001

FED Share:

GA Share:

UNDERWAY
. $911,000 $728,800 $182,200

PROJECT: 811066- TYPE WORK: WEIGH STATION

FUND: 1M

LENGTH (miles 1 km) 010.00

DESCRPT: UPGRADE 1-85 NB AND SB WEIGH STATIONS INCL SCALE REPLACEMENT

PE: 1995 ROW: NONE CST: 2002 FED Share: GA Share:

UNDERWAY
$5,000,000 $4,500,000
$500,000



Page 310 of336

STATE TRANSPORTATION IMPROVEMENT PRO.GRAM
9/21/00

TURNER COUNTY
PROJECT: 0000815 TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: CR 35 IN SYCAI\:10RE @ NS # 723706V LUMP SUM PROJECT

, FUND: STP 0/0,00

PE: NONE ROW: NONE CST: 2001 FED Sit are: GA Share:

$100,000 $80,000 $20,000

PROJECT: 0000816 TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: CR 113 IN SYCAMORE@NS # 723708J LUMP SUM PROJECT

FUND: STP
0/0.00

PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$100,000 $80,000 $20,000

PROJECT: 0000817 TYPE WORK: RR XING LENGTH (miles / km)
. DESCRPT: CR 280 IN ASHBURN @ NS # 723617D LUMP SUM PROJECT

FUND: STP
0/0,00

PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$100,000 $80,000 $20,000

PROJECT: 410250- TYPE WORK: WIDENING

FUND:NHS

" LENGTH (miles / km) 14.5123.35

DESCRPT: 1-75 FM N/SR 159 NR ASHBURN TO S/SR 300/CRISP - PHASE I

EXIST. LANES: 04 PROPOSED LANES: 06

. ASSOCIATED PROJECTS: 4I025X-

PE: 1986 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$55,000,000 $44,000,000 $11,000,000

PROJECT: 431570- . TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles / km}; 0.21 /0.34

ROW: 2001

DESCRPT: SR I 12 @ UTILE RIVER 3 MILES WEST OF SYCAMORE

CST: 2001

FED Share:

GA Share:

UNDERWAY $2,000
$950,000 $760,000 $190,000

. 'PROJECT: 431580" ' TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles /km) 0.2/0,32

ROW: 2001

DESCRPT: SR 112 @ ASHBURN BRANCH 1.6 MILES SW OF ASHBURN

CST: 2001

FED Share:

GA Share:

UNDERWAY $2,000
$250,000 $200,000
$50,000

PROjECT: 431590- TYPE WORK: REPLACE BRIDGE , LENGTH (miles / km)
DESCRPT: SR 112 @DANIELS CREEK SOUTHWEST OF ASHBURN

FUND: BRIDGE

PE: 1995

0.19/0.31

ROW: 2001

CST: 2001

FED Share: '

GA Share:

UNDERWAY $1,000
$700,000 $560,000 $140,000

PROJECT: 431600- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles / km) 0.2/0.32

ROW: 2001

DESCRPT: SR 112 @ BIG BRANCH 6.1 MILE SOUTHWEST OF SYCAMORE

CST: 2001

FED Share:

GA Share:

UNDERWAY $2,000
$715,000 $572,000 $143,000

Page 311 0/336

_.~_._-.,."...

.,..

STATE TRANSPORTATION IMPROVEMENT PROGRAM

"'C/-..__,

"' 9/21/00

4 _...~_'

TURNER COUNTY
PROJECT: 442980- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPi,: SR 112 @ DEEP CREEK 4.6 MI E OF ASHBURN

FUND: BRIDGE 0.27/0.43

PE: 1999 ROW: 2003 CST:

_
~
UNDERWAY $10,000
AFTER 2003

PROJECTr' 442981- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 112 @ DOUBLE RUN CREEK I MI SW OF REBECCA

FUND: BRIDGE 0.24 /0.39

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page312of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00.

TWIGGS COUNTY
PROJECT: 322470- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 96 FM SR 87 TO 1-16 EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STP 7.5 / 12.08

PE: 2003 ROW: CST:

$1,164,000 AFTER 2003 AFTER 2003

PROJECT: 342980- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 18 WB MP 2.31 - 3.6 & EB MP 7.0 - 8.5 IN WILKINSON EXIST. LANES: 02 PROPOSED LANES: 03 ASSOCIATED PROJECTS: 34298X-

FUND: STP 2.79 /4.49

PE: 2001 ROW: 2001 CST: 2002 FED Share: GA Share:

$125,000 $64,000
$1,419,000 $1,135,200
$283,800

.~

Page 313 of336

.. .;
. "i 1
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00

I
I
UNION .cOUNTY

PROJECT.l 0000848 TYPE WORK: REPLACE BRIDGE

FUND: FOREST HWY PE: 2001

i

LENGTH (miles / km) 0.2 I /0.34

I
DESCRPTf CR 228/FS 236@COOPER CREEK 10.3 MI SW OF BLAIRSVILLE

I

I

ROW: NONE CST: 2003 FED Share:

! I
I I

PROJECT:: 132180- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2001

:

.

LENGTH (miles / km) 0.23/0.37

ROW: LOCL

DESCRPT: CR 341 @ NOTTLEY RIVER SW OF BLAIRSVILLE

CST: 2003

FED Share:

GA Share:

OTHShare:

$25,000
$500,000 $500,000
$40,000
$1,430,000 $1,144,000
$156,000 $130,000

.

Page 314 of336

r---=====:::::==================================:::::========================.=-~--=-~-~-
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

UPSON COUNTY
PROJECT: 0000132 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles I km) 0 10.00
DESCRPT: FLINT RlVER ACCESS/BOAT RAMP AND RESTROOMS

PE:LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0001 I 16 TYPE WORK: RR XING LENGTH (miles I km)
DESCRPT: CR 425/DEL RAY RD IN THE ROCK @ NS # 718270L LUMP SUM PROJECT

FUND: STP 010.00

OTH Share:
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$125,000 $100,000
$25,000
$100,000 $80,000 $20,000

PROJECT: 322550- TYPE WORK: WIDENING

FUND: STP

LENGTH (miles I km) 1.1 11.77

DESCRPT: SR 74 FM HOLSTUN DR TO KNIGHT TRAIL IN THOMASTON

EXIST. LANES: 02 PROPOSED LANES: 05

PE: 1993 ROW: 2003 CST:

UNDERWAY $350,000
AFTER 2003

PROJECT: 322920- TYPE WORK: INTERSECTION IMPROVEMENT

FUND: NHS

LENGTH (miles I km) 0.2/0.32

DESCRPT: SR 3IUS 19 AT CR 73/EAST AND WEST COUNTY ROAD IN THOMASTON

PE: 2001 ROW: 2002 CST: 2003 FED Share:

$10,000 $102,000 $288,000 $288,000

PROJECT: 322922- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 3/US 19 @ POTATO CREEK IN THOMASTON

FUND: BRIDGE 0.26 10.42

PE: 1999 ROW: 2003 CST:

UNDERWAY $50,000 .
AFTER 2003

PROJECT: 33280X- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles I km) 0 10.00

DESCRPT: SR 18/74/109 AT FIVE LOCATIONS SEE MERIWETHER PI 332800

EXIST. LANES: 02 PROPOSED LANES: 03

ASSOCIATED PROJECTS: 332800-

PE:NONE ROW: NONE CST: NONE

PROJECT: 33290X- TYPE WORK: PASSING LANES

FUND: STP

.LENGTH (mileslkm) 010.00

DESCRPT: PASSING LANES - 2 SITES/UPSON & 4/TALBOT/332900 & 0000929

EXIST. LANES: 02 PROPOSED LANES: 03

ASSOCIATED PROJECTS: 332900-

PE:NONE ROW: NONE CST: NONE

PROJECT: 343 I IX- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

LENGTH (miles I km) 0 10.00

DESCRPT: CR 172IPOBIDDY ROAD @ FLINT RIVER N OF .JCT SR 22fT ALBOT

ASSOCIATED PROJECTS: 343 I 10-

PE:NONE ROW: NONE CST: NONE

Page 315 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00

UPSON,COUNTY
PROJECT~ 371780- TYPE WORK: SIDEWALKS

I

LENGTH (miles / km)

DESCRPT: MULTI-USE SIDEWALKS IN THOMASTON

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

$275,000 $220,000
$55,000


Page316of336

----

---_._---
STATE TRANSPORTATION IMPROVEMENT PROGRAM

9/21/00

~

.......... .. '"'.~

"""'_~M""

~~

.. "'_-lC--..-

.,

...""_..-..

>_..,:

,_

WALKER COUNTY

PROJECT: 0000144 TYPE WORK: LANDSCAPING

CHAITANOOGA TMA TIP #

LENGTH (miles / km)

DESCRPT: ROSSVILLE-CHICKAMAUGA AVE STREETSCAPE

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$750,000 $600,000

OTHShare:

PROJECT: 62J61X- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles 1 km) 0 10.00

DESCRPT: SR IIUS 27 FM CR 331ITRION TO LAFA YElTE BYPISEE CHAlTOOGA

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 621610-

PE.NONE ROW: NONE CST: NONE

$150,000

PROJECT: 621650- TYPE WORK: PASSING LANES LENGTH (miles 1 km)
DESCRPT: SR 136 EB MP 21.4-22.8- 25.7-26.6IWB 4.12-5.22- 26.6-28.0 EXIST. LANES: 02 PROPOSED LANES: 03

FUND: STP 3.7/5.96

PE: 1992 ROW: 2002 CST:

UNDERWAY $450,000
AFTER 2003

PROJECT: 642250- TYPE WORK: WIDENING

FUND: NHS

CHAITANOOGA TMA TIP # NH-STP-98

LENGTH (miles / km) 5.04 /8.11

DESCRPT: SR 193 FM OLD SR 193 NORTH TO TENN STATE LINE & 64Y250 (STP)

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 64Y250-

PE: 2001 ROW: NONE CST:

$294,000
AFTER 2003
..\.\-

PROJECT: 671216- TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

LENGTH (miles 1 km} 010.00

DESCRPT: CHATTANOOGA CREEK GREENWAY MULII-USE TRAILS & BRIDGE REHAB

PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTH Share:

PROJECT: 86YllO- TYPE WORK: PRELIMINARY ENGINEERING

FUND: HPP

CHAITANOOGA TMA TIP #

LENGTH (miles 1 km) 0/0.00

DESCRPT: TRANS ALT STUDY FM ATLANTA TO CHATTANOOGA(ROSSVILLE $)860110 PROPOSED TCM

ASSOCIATED PROJECTS: 860 110-

PE:2001 ROW: NONE CST: NONE

:!
$100,000 $80,000
$20,000 $500,000

Page 317 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM

_ _ _ _ _ _ _ _ _ _ _ _ _ _ , . . " . . f ' _ J I : l '_ _ "'

9/21/00

~_... ,_,

_ _. < ~ _ .

_

WALTO,N COUNTY

PROJECT~, 0000171 TYPE WORK: LANDSCAPING

FUND: STP

PE: LOCL

I

LENGTH (miles/km) 0/0.00

ROW: LOCL

I DESCRPT~ MONROE-BROAD STfGA HWY II CORRIDOR STREETSCAPE IMPROVEMENTS

CST: 200 I

FED Share:

I
I

I
PROJECT: 0000412 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

LENGTH (miles / km) 0.2'/0.32

DESCRPT: SR 10178 @ SPRING STfSR lOBUS-ADD WB RAMPSfUPGRD INTERCHNGE

OTH Share:
PE: 2003 ROW: CST:

$606,000 $485,000
$121,000
$869,000 AFTER 2003 AFTER 2003

I
I
I
PROJECT: 0000417
iI

TYPE WORK:

REALIGNMENT LENGTH (miles / km)

FUND: STP 1.1 / 1.77

DESCRPT': SR II & MADISON RD 1-WAY BET MILL ST & MARBLE ST IN MONROE
i

PE: 2003 ROW: CST:

$449,000 AFTER 2003 AFTER 2003

PROJECn 132980- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT:, SR II @ CSX RAILROAD IN SOUTH SOCIAL CIRCLE

FUND: BRIDGE 0.23/0.37

PE: 1999 ROW; 2002 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT:; 132981- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

I

LENGTH (miles / km) 0.24 /0.39

DESCRPT:: SR II @APALACHEERIVER 7.5 MI NORTH OF MONROE

PE: 1999 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

I
PROJECT:' 132982- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

I

LENGTH (miles / km) 0.28/0.45

DESCRPT:: SR IOfUS 78 WBL @APALACHEERIVER4 MI E OF GRATIS

I

PE: 1999 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT:, 132983- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles/km) 0.24/0.39

DESCRPT:: SR lOBUS WBL @ SR 10 EBL (US 78) 2 MI WEST OF MONROE

i

PE: 1999 ROW: 2002 CST:

UNDERWAY $10,000
AFTER 2003

I

.

PROJECT: I 142000- TYPE WORK: PASSING LANES

I

LENGTH (miles / km)

FUND: STP 2.5 /4.03

PE: 1999 ROW; 2003

UNDERWAY $165,000

v

DESCRPT:; SR 20- 4-INTERS & 2-PASSING LN FM ROCKDALE CL TO LOGANVILLE EXIST. LANES: 02 PROPOSED LANES: 03

I

i

CST: 2003 FED Share:
GA Share:

$880,000 $704,000 $176,000

Page 318 of336

STATE TRANSPORTATION IMPROVEMEN,T PROGRAM
9/21/00

WALTON COUNTY
PROJECT: 142295- TYPE WORK:, REPLACE BRIDGE I LENGTH (miles / km)
DESCRPT: SR 81 @ ALCOVY RIVER 2 MI SW OF BOLD SPRINGS

FUND: BRIDGE 0.23/0.37

PE: 2001 ROW: CST:

$20,000 ....
AFTER 2003 AFTER 2003

PROJECT: 171170- TYPE WORK: REPLACE BRIDGE .

FUND,: BRIDGE

PE: )995

LENGTH (miles / km) 0.2/0.32

ROW: LOCL

. DESCRPT: CR 289/BEARDEN ROAD @ JACKS CREEK 1.2 MI NW OF GOOD HOPE

CST: 200)

FED Share:

GA Share:

UNDERWAY
$470,000 $376,000
$94,000

PROJECT: 21088X- TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: 1-20 SAFETY UPGRADES @ 2 LOC NEWT9N/ I LOqSEE NEWTON 210880

ASSOCIATED PROJECTS: 210880-

PE:NONE ROW: NONE CST: NONE

Page 319 of336

STATE TRANSPORTATION iMPROVEMENTPROGRAM

WAR~hOUNTY

.._._----- 9/21/00
----._--------_.,-~_._--_._

I
PROJEC1i.: 0001219 TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2002

$40,000

LENGTH (miles I km) 0.22/0.35
I
DESCRP1(: SR 4IUS 1 @ DRYDEN CREEK 5 MI N OF WAYCROSS

ROW: NONE CST:

AFTER 2003

I
I

I

I

PROJECT: 422125- TYPE WORK: BRIDGE REHAB

i

LENGTH (miles I km)

FUND: BRIDGE' 0.1/0.16

PE: 1995 ROW: NONE

DESCRPT;: SR 38/US 84 @ SUWANNEE CRK

CST: 2003

EXIST. L~NES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 422 I20I i I
PROJECT: 42212X- TYPE WORK:
iI

WIDENING
LENGTH (miles rkm)

GA Share:

FUND: STATE .010.00

PE:NONE ROW: NONE

DESCRPT,: SR 38 FM WEST OF WOODYARD CK TO W OF GREASY CK /422120

CST: NONE

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 422120-

UNDERWAY
$138,000 $110,400
$27,600

I

PROJECT~ 521530- TYPE WORK: WIDENING

I

:

LENGTH (miles I km)

FUND:NHS 1.3 12.09

I
DESCRPT: SR 4BU/USI/WAYCROSS FM N/BLACKSHEAR AV TO CR I44/AI RPORT RD

EXIST. L~NES: 02 PROPOSED LANES: 05

0.:[

i

I ,

PE: 1992 ROW: 2003 CST:

UNDERWAY $2,000,000 AFTER 2003

I

PROJECT} 522060- TYPE WORK: RAMP I ,

FUND: STATE LENGTH (miles I km) 0.1/0.16

PE: 1995 ROW: 2001

UNDERWAY $20,000

DESCRPr': US82/84 CONN. FM CORRIDOR Z TO US 84/FRANCIS ST. ,
EXIST. LANES: 04 PROPOSED LANES: 05 I
I

CST: 2002 GA Share:

$140,000 $140,000

i

PROJECT.~ 522400- TYPE WORK: WIDENING

i

.

LENGTH (miles I km)

FUND: STATE 9.3 114.97

DESCRPT~ SR 4IUS I FM WAYCROSS BYP @ CR 152 TO BACON COUNTY LINE

EXIST. LANES: 02 PROPOSED LANES: 04 !

I

PE: 1993 ROW: 2001 CST:

UNDERWAY $3,850,000 AFTER 2003

i
PROJECT: 522770- TYPE WORK: WIDENING j
LENGTH (mileslkm)

FUND: STATE 8.7/14.01

PE: 1994 ROW: 2002

UNDERWAY $1,250,000

DESCRPT:; SR 38IUS 84 FM 900 FT W OF GREASY BRANCH CK TO CR 79/NEEDHAM

CST:

AFTER 2003

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIAljED PROJECTS: 522775-

I
i

PROJECT:! 522780- TYPE WORK: WIDENING

FUND: HPP

PE: 1994

UNDERWAY

I

LENGTH (mileslkm) 4.817.73

ROW: 2001

$4,285,000

DESCRPT:: SR 38/US 84 FM CR 79/NEEDHAM RD TO SR 38 @ SR50lUS82

'.

EXIST. LANES: 02 PROPOSED LANES: 04

I

ASSOCIATED PROJECTS: 52Y780

I

I

I

I

I,

CST: 2003 FED Share:
GA Share:

$4,916,000 $3,932,800
$983,200

Page 320 of336

~. 'r .:. ~
STATE TRANSPORTATioNiMPROVEMENTPROGRAM

9/21/00

I
WARE CQUNTY

I PROJECT: b3255- TYPE WORK: TURN LANES

FUND: NHS

t

LENGTH (miles / km) 21.4 /34.44

DESCRPT: ,SR 4 TURN LANES FM LUCY MOORE RD TO HAVANNA AVE
I I

PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$5,005,000 $4,004,000 $1,001,000

PROJECT: '52Y780- TYPE WORK: WIDENING

FUND: STATE

I

~ENGTH (miles / km) 6.2/9.98

s DESCRPT:,SR 38/US 84 FM CR"79 TO EXISTING 5-LN @ SR 4 N. -FOR EDS

EXIST. LAN,ES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 522780-

I

.

PE: 1994 ROW: NONE CST: 2003
GA Share:

PROJECT: 1571420- TYPE WORK: HISTORIC PRESERVATION

I

LENGTH (miles / km)

DESCRPT: ,REHABILITATION OF WAYCROSS DEPOT - PHASE II

I

"

I'

FUND:STP 0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

UNDERWAY $3,703,000 $3,703,000
$986,000 $789,000 $197,000

Page 321 of336

STATE TRANSPORTATION IMPROVEMENTPROGRAM

_

...... _ ..._ _ .... ..... Qa'"-~""".r

"

9/21/00
,,,_'

u'

...._. "

_

WARREN COUNTY
PROJECT: 210930- TYPE WORK: INTERCHANGE LENGTH (mileslkm)
'DESCRPT: 1-20 SAFETY UPGRADES @ SR 12; NORWOOD & SR 80

FUND: 1M 0.6/0.97

PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY

$6,900,000

$6,210,000

~

$690,000

PROJECT: 221620- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE.

PE:1991

LENGTH (miles I km) 0.56/0.90

ROW: 2000

DESCRPT: SR 17@REEDY CK {FM SR 296/MP 0.18 TO MP 0.74}RDWY $=22Y620

CST: 2001

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

ASSOCIATED PROJECTS: 22Y620-

G!! Share:

. UNDERWAY UNDERWAY
$506,000 $404,800 $101,200

PROJECT: 22Y620-TYPE WORK: REPLACE BRIDGE

FUND:NHS

LENGTH (mileslkm) 010.00

DESCRPT: SR 17 @ REEDY CK {FM SR 296/MP O. I8 TO MP 0.74}BRDG $=22 1620

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 221620-

PE: 1991 ROW: NONE CST: 2001 FED Share: GA Share:

UNDERWAY
$1,700,000 $1,360,000
$340,000

PROJECT: 232220- TYPE WORK: RR XING

FUND: STP

PE: 1999

LENGTH (miles I km) 0.4/0.64

ROW: 2001

DESCRPT: SR 12/E WARRENTON @ SOUTHERN RR BRIDIREMOVE & REPL WI@-GRADE

CST: 2003

EXIST. LANES: 02 PROPOSED LANES: 04

FED Share:

GA Share:

UNDERWAY $50,000
$751,000 $600,800
. $150,200 .',.

Page 322 of336

_ _ _-+-

STATE TRANSPORTATION IMPROVEMENT PROGRAM

.

... 9/21/00 ~'~_~~'r"#',.T.

. . __. ..,..~~I_

~ ~

_

I
WASHINGTON COUNTY I
I PROJECT: 0000418 TYPE WORK:

MEDIAN WORK LENGTH (miles/km)

FUND: STP 0.1/0.16

PE: 2001 ROW:

$57,000 AFTER 2003

DESCRPT: SR 15 SOUTH IN THE CITY OF SANDERSVILLE

CST:

AFTER 2003

PROJECT: 0001121 TYPE WORK: RR XING

FUND: STP

I

LENGTH (miles / km} 0/0.00

DESCRPT: CR I 26/SUN HILL GRANGE RD IN TENNILLE @NS# 732747Y I
LUMP SUM PROJECT

PE:NONE ROW:NONE CST: 2001 FED Share: GA Share:

$100,000 $80,000 $20,000

PROJECT: 220545- TYPE WORK: WIDENING

FUND: STATE

I

LENGTH (miles / km) 0.8 / 1.29

DESCRPP: SR 15 FM 800 FT S OF MATTHEWS RDffENNILLE TO WACO RD

EXIST. d.NES: 04 PROPOSED LANES: 05

PE:NONE ROW: 2001 CST: 2002
GA Share:

$382,000 $1,454,000
$1,454,000

I PROJECP: 22219X- TYPE WORK: PASSING LANES LENGTH (miles / km)

FUND: STP 0/0.00

DESCRPi: SR 15 @ 3 LOC BTWN WRIGHTSVILLE & TENNILLE/ SEE JOHNSON CO

ASSOCIArD PROJECfS, 222190-

PE:NONE ROW: NONE CST: NONE

PROJECP: 222285- TYPE WORK: WIDENING

I

LENGTH (miles / km)

DESCRPT!: SR 24/SR 540 FM CR IO TO JUST WEST OF SR 68 I
EXIST. LANES: 02 PROPOSED LANES: 04

FUND: NHS 8 / 12.88

PE: 1996 ROW: 2002 CST: 2003 FED Share: GA Share:

UNDERWAY $1,606,000 $12,863,000 $ I0,290,400 $2,572,600

PROJECP: 22228X- TYPE WORK: WIDENING

I

LENGTH (miles / km)

FUND: HPP 0 /0.00

DESCRP1{: SR 24/SR 540 FM SOUTH OF CR 186 TO CR 10; SEE BALDWIN CO
I
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATED PROJECTS: 222280-

PE:NONE ROW: NONE CST: NONE

I
PROJECT!: 222290-
I

TYPE WORK:

WIDENING LENGTH (miles / km)

FUND: STATE 12.2 / 19.64

DESCRP1j: SR 88/SR 540 FR W OF CR 106 TO SR 171 IN JEFFERSON CO & Y

EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIA!'D PROJECTS, 22229X- 22Y290-

PE: 1993 ROW: 1999 CST: 2002
GA Share:

UNDERWAY UNDERWAY $21,099,000
$21,099,000

PROJEC1I.1: 22Y290- TYPE WORK: WIDENING

FUND: BRIDGE

PE:NONE

LENGTH (miles / km) 0/0.00

ROW: NONE

DESCRP~: SR 88/SR 540 BRIDGES AT WILLIAMSON; OGEECHEE & OVERFLOW

CST: 2002

EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCJAlfED PROJECTS: 222290-

FED Share: GA Share:

$2,800,000 $2,240,000
$560,000

Page 323 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM

__________ .

.,rt

*,, 9/21, /00 * _ _

._.

_

WASHINGTON COUNTY

PROJECT: 231240- TYPE WORK: PASSING LANES

FUND: STP

LENGTH (miles / km) . 2.6/4.19

DESCRPT: SR 24 BET SANDERS'LE & DAVISBORO EB MP 14.3-13.4IWB 5.3-7.0

EXIST. LANES: 02 PROPOSED LANES: 03

ASSOCIATED PROJECTS: 245140-

PE: 1997 ROW: 200i CST: .

UNDERWAY $15,000
AFTER 2003

PROJECT: 245140- TYPE WORK: .REPLACE BRIDGE

FUND: BRIDGE

,

' LENGTH (miles / km) 0.25/0.40

DESCRPT: SR 24 OVER WILLIAMSON SWAMP CREEK 1.3 MILES NW OF DAVISBORO

ASSOCIATED PROJECTS: 231240-

PE: 1997 ROW: 2001 CST:

UNDERWAY $5,000
AFTER 2003

PROJECT: 262480- TYPE WORK: . MINOR WIDEN & RESURF

FUND: STP

,

LENGTH (miles / km) 0.6/0.97

DESCRPT: SR 24 REL ALONG CR 67 FM SR 24 N TO SR 540/FALL LINE FWY

PE: 1997 ROW: 2001 CST:

UNDERWAY $22,000
AFTER 2003

Page 324 of336

I
I

STATE TRANSPORTATION IMPROVEMENT PROGRAM

I

9/21/00

.I
WAYNE COUNTY
I
PROJECT: 0000078 TYPE WORK: BICYCLE/PED. FACILITY

FUND: STP

f

LENGTH (miles / km) 0/0.00

DESCRPTi JESUP CORRIDOR ENHANCEMENTS AND RR & BUS DEPOT REHAB.

PE: LOCL ROW: LOCL CST: 2001 FED Share:

I

PROJECT: 52234X- TYPE WORK: WIDENING

i

LENGTH (miles / km)

OTH Share:

FUND: STATE 0/0.00

PE:NONE ROW: NONE

DESCRP'P: SR 38/US84 FM CR 107/0FFERMAN TO S. CITY LMTS SCREVEN/PIERCE

CST: NONE

EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATED PROJECTS: 522340-

I

I

PROJECT: 522380- TYPE WORK: WIDENING

I

LENGTH (miles/km)

FUND: STATE 6.71/10.80

PE: 1994 ROW: 2001

DESCRP'P: SR 38IUS 84 FM SOUTH CITY LIMITS OF SCREVEN TO SR 203

CST:

EXIST. LANES: 02 PROPOSED LANES: 04

$500,000 $400,000 $100,000
UNDERWAY $2,214,000 AFTER 2003

PROJECT: 522390- TYPE WORK: WIDENING

I.

LENGTH (miles / km)

DESCRP'P: SR 38/US 84 FM SR 203 TO CR 392 AT JESUP

EXIST. LANES: 02 PROPOSED LANES: 04
[.

FUND: STATE 5.13 /8.26

PE: 1994 ROW: 2003 CST:

I

PROJECT: 522410- TYPE WORK: WIDENING

i

LENGTH (miles / km)

DESCRP'P: SR 27/US 341 FM E CL OF ODUM E TO CR 115

EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATED PROJECTS: 522420-

I
I
I PROJECT: 522420-

TYPE WORK:

WIDENING LENGTH (miles / km)

DESCRPT: SR 27/US 341 FM CR 115 TO WEST OF CL OF JESUP

EXIST. LANES: 02 PROPOSED LANES: 04

I

.

ASSOCIAjD PROJECTS' 522410-

FUND: STATE 1.88/3.03
FUND: STATE 5.17/8.32

PE: 1993 ROW: 1997 CST: 2001
GA Share:
PE: 1993 ROW: 1997
~.
CST: 2001
GA Share:

UNDERWAY $3,825,000 AFTER 2003
UNDERWAY UNDERWAY
$2,853,000 $2,853,000
UNDERWAY UNDERWAY $7,653,000 $7,653,000

I PROJECT: 522450- TYPE WORK: WIDENING LENGTH (miles / km) DESCRPT: SR 27IUS 341 FM CR 260 TO GLYNN COUNTY LINE EXIST. LANES: 02 PROPOSED LANES: 04

FUND: STATE 9.8/15.78

PE: 1993 ROW: 1998 CST: 2001

GA Share:

UNDERWAY UNDERWAY $16,047,000
$16,047,000

PROJECT: 52258X- TYPE WORK: WIDENING

I

LENGTH (miles / km)

FUND: STATE 0/0.00

DESCRPT: SR 27IUS 341 FM CL SURRENCY TO WEST CL@ODUM/SEEAPPLING

EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATED PROJECTS: 522580-

PE:NONE ROW: NONE CST: NONE

Page 325 of336

. _,= I--====::~~~~~'"_.,.~,.,=-..-=- ~,'~,~,~.~~==~~===~~~~~~-
__. _ - STATE TRANSPORTA,TION IklPROVEMENT PROGRAM 9/21/00
... --...;...--------------~----------------_

WAYNE, COUNTY

PROJECT: 542425-TYPE WORK: REPLACE BRIDGE

,I

'

LENGTH (miles I km)

DESCRPT: 'SR 203 @ REEDY CREEK 1.1 MI E OF APPLING CO LINE

FUND: BRIDGE 0:22 10.35

. PE: 2001 ROW: , CST:

$20,000 AFTER 2003 AFTER 2003

.. !.

"
','

.,
"

Page 326 of336

---+--

._ _ .. ,;.;. ....:.:.;....~.;._._-_ .=.:-..._;....;.-----------------

STATE TRANSPORTATION IMPROVEMENT PROGRAM

0_.'_..

9121100 __ __.

,.~.

~

o

_

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT:

TYPE WORK: REPLACE BRIDGE

LENGTH (miles I km)

DESCRPT:13S4R33 416 @ 0- BEAR CREEK 1.8 Ml N OF WESTON

FUND: BRIDGE 0.21 10.34

PE: 1999. ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT:, 343361- TYPE WORK: REPLACE BRIDGE

I

LENGTH (miles I km)

DESCRPT: SR 41 @KINCHAFOONEECREEKIN SW PRESTON

FUND: BRIDGE 0.26 10.42

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT) 343362- TYPE WORK: REPLACE BRIDGE

I

LENGTH (miles I km)

DESCRPT: SR 153 @ LANAHASSEE CREEK 3.5 MI NE OF PRESTON

FUND: BRIDGE 0.23/0.37

PE: 1999 . ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

-'

PROJECT: .343363- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

I1

LENGTH (mileslkm) 0.2310.37

DESCRPT~ SR 45 @ KINCHAFOONEE CREEK OfF .2 MI S OF SUMTER CO LINE

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

PROJECT) 343364- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

I

LENGTH (miles I km) 0.27 10.43

DESCRPT: SR 45 @ KINCHAFOONEE CREEK .1 MI W OF SUMTER CO LINE

I.

-

PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003

Page 327 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
'--------------_._-~-_._--_._--------._------

WHEELER COUNTY
PROJECT: 0000133 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: GLENWOOD DOWNTOWN PARK

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

$25,000 $20,000

OTHShare:

PROjECT: 0001220 "TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km). 0.23/0.37

DESCRPT: SR 31/US 319/US 441 @CSX RAILROAD (635193G) NEAR MCRAE

EXIST. LANES: 02 PROPOSED LANES: 04

PE: 2002 ROW: NONE , CST: "

$5,000 $50,000 AFTER 2003

PROJECT: 262061- TYPE WORK: WIDENING

FUND:NHS'

.

LENGTH (miles / km) 11.5 /18.52

DESCRPT: SR 311US 441 FM N/CR 132 THRU DODGE TO SR 46/LAURENS

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 26206X- 26Y061-

PE: 1992 ROW: 2002 CST:

UNDERWAY $3,512,000 AFTER 2003

PROJECT: 531250- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 46 AT OCONEE RIVER

FUND: BRIDGE

PE: 1991

0.2/0.32

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY $25,000
$15,000,000 $12,000,000 $3,000,000

PROJECT: 533150- TYPE WORK: REPLACE BRIDGE

' FUND: BRIDGE

PE: 1999

.

LENGTH (miles / km) 0.23/0.37

ROW: 2001

DESCRPT: SR 30mS 280 @ OCHWALKEE CREEK I MI E OF GLENWOOD

CST:2001 .:

FED Share:

GAShare:

UNDERWAY $10,000
$953,000 $762,400 $190,600

PROJECT: 542 i 00- TYPE WORK: I REPLACE BRIDGE
LENGTH (miles / km) DESCRPT: SR 19 @ OCHWALKEE CREEK I MIN OF GLENWOOD '

FUND: BRIDGE

PE: 1997

0.5/0.81

ROW: 2001

CST: 2002

FED Share:

GA Share:

UNDERWAY $10,000
$1,008,000 $806,400 $201,600

PROJECT: 56147X- TYPE WORK: NEW CONSTRUCTION

FUND: STATE

LENGTH (miles/km) 0/0.00

DESCRPT: N MCRAE BYP FM US 341/S BYPTO US 441/TELFAIR/INCL SIGNALS

ASSOCIATED PROJECTS: 561470-

PE:NONE ROW: NONE CST: NONE

Page 328 of336

----+----------_.__._-_ _-_ _ .

STATE TRANSPORTATION IMPROVEMENT PROGRAM

- 'WHITE bo~::

----- 9121100 ----_._--_.-----

PROJECT) 0000146 TYPE WORK: BICYCLE/PED. FACILITY

I

LENGTH (miles / km)

DESCRPT: HELEN - MAIN STREET BRIDGE WALKWAY/UNDERPASS

I

.

FUND: STP 0/0.00

PE:LOCL ROW: LOCL CST: 2001 FED Share:

$20,000 $16,000

PROJECT:: 122130- TYPE WORK: WIDENING

I

LENGTH (miles / km)

DESCRPT) SR 75 FM SR 75 ALT/CLEVELAND NE TO CR 88 I
EXIST. LANES: 02 PROPOSED LANES: 03

FUND: STP 2.21/3.56

OTH Share:
PE: 1999 ROW: 2002 CST:

$4,000
UNDERWAY $42,000
AFTER 2003

PROJECT:,132560- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1996

LENGTH (miles / km) 0.23 /0.37

ROW: 2001

DESCRPT.! SR 115 @ CHAITAHOOCHEE RIV 7.5 MI E. OF CLEVELAND/HABERSHAM

I

.

ASSOCIAFED PROJECTS: 13256X-
I

I

CST: 2002 FED Share:
GA Share:

PROJECT) 141830- TYPE WORK: PASSING LANES

FUND: STP

I

LENGTH (miles / km) 7.32/11.79

DESCRPT.; SR 384/DUNCAN BRIDGE RD FM W OF SR 115 TO SR 75 (8 LOCATIONS

PE: 2002 ROW: CST:

EXIST. LTES' 02 PROPOSED LANES, OJ

UNDERWAY $20,000
$818,000 $654,400 $163,600
$140,000
AFTER zcm
AFTER 2003

I

117088 PROJECT :

I- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

LENGTH (miles / km) 0.1 /0.16

PE: 1993 ROW: LOCL

DESCRPT.1 CS 613ILORELY RD OVER CHAITAHOOCHEE RIVER IN HELEN
I
I
I

CST: 2001 FEDShllre:
GA Share:

UNDERWAY
$306,000 $244,800
$61,200

Page 329 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
_.- - - - - - - - - 9/21/00
,--~""--~,.....-"''''''-~=''''----------,_._.

WHITFIELD COUNTY
PROJECT: 0000147 'TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: TUNNEL HILL W&A RAILROAD TUNNEL PHASE 2

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: 0000931 TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles / km) 0.72 / 1.16

DESCRPT: 1-75 @SR3IUS41/ROCKY FACE EXIT - PHASE 2 WIDENING

EXIST. LANES: 04 PROPOSED LANES: 06

OTHShare:
PE: 1994 ROW: 2001 CST:

$313,000 $250,000
$63,000
UNDERWAY $600,000
AFTER 2003

PROJECT: 610760- TYPE WORK: TURN LANES

FUND: 1M

LENGTH (miles / km) 0.4/0.64

DESCRPT: 1-75 @SR3/US41/ROCKYFACE-RAMPWORK; TURN LANE; SIGNAL

PE: 1994 ROW: NONE CST:'2001 FED Share: GA Share:

UNDERWAY
$231,000 $207,900
$23,100

PROJECT: 610890- TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles / km) 1.24/2.00

DESCRPT: 1-75 INTERCHANGE AT CARBONDALE ROAD/CR 665/SEE 61Y890

ASSOCIATED PROJECTS: 61Y890-

PE: 1995 ROW: 2001 CST:

UNDERWAY $3,257,000 AFTER 2003

PROJECT: 611280~ TYPE WORK: BRIDGE PAINTING LENGTH (miles / km)
DESCRPT: BRIDGE PAINTING IN WHITFIELD COUNTY/61Y280 LUMP SUM PROJECT ASSOCIATED PROJECTS: 61Y280-

FUND: 1M 0/0.00

PE:~ONE . ROW: NONE CST: 2001 FED Share: GA Share:

$401,000 $360,900
$40,100

PROJECT: 61131X- TYPE WORK: INTERCHANGE

FUND: 1M

LENGTH (miles / km) 0/0.00

DESCRPT: I-59 @ 3 LOQI-24 @ 111-75 @ 4/WHITFIELD/CATOOSA--6 11310IXIZ

ASSOCIATED PROJECTS: 611310-

PE:NONE ROW: NONE CST: NONE

PROJECT: 61Y280- TYPE WORK: BRIDGE PAINTING LENGTH (miles / km)
DESCRPT: BRIDGE PAINTING IN WHITFIELD COUNTY/611280 LUMP SUM PROJECT ASSOCIATED PROJECTS: 611280-

FUND: STP 0/0.00

PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:

$326,000 $260,800
$65,200

PROJECT: 61Y890- TYPE WORK: INTERCHANGE

FUND: STP

LENGTH (miles / km) 0 /0.00

DESCRPT: 1-75 INTERCHANGE AT CARBONDALE ROADICR 665/SEE 610890

ASSOCIATED PROJECTS: 610890-

PE: 1995 ROW: 2001 CST:

UNDERWAY $3,300,000 . AFTER 2003

Page 330 of336

- - - - ' - - - - - - - _ _ __ __._ _ _._ .
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

I
WHITFI~LD COUNTY
PROJECT: 1622115- TYPE WORK: ATMS/ITS LENGTH (miles / km)
DESCRPT: ATMS/ DALTON SLO SCAN/CMS/RADAR

FUND: NHS 0/0.00

PE: NONE ROW:NONE' CST: 2001 FED Share: GA Share:

$1,650,000 $1,320,000
$330,000

PROJECT: jM000436 TYPE WORK: BRIDGES

i

LENGTH (miles / km)

FUND: NHS 0/0.00

DESCRPT: IDECK REPLACEMENTIREHAB @ SEVERAL LOC IN WHITFIELD CO/PE ONLY

LUMP SUM PROJECT

PE: 2001 ROW: NONE CST: NONE

$40,000

Page 331 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

WILCOX COUNTY
PROJECT: 0000134 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: PINEVIEW CABOOSE PARK

FUND: STP 0/0.00

. PE: LOCL ROW: LOCL CST: 2001 FED Share:

OTHShare:

PROJECT: 431690- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1997

LENGTH (miles / km) 0.21 /0.34

ROW: 2000

DESCRPT: SR 30/US 280 @ALAPAHA RIVER TRIB. 0.7 MI W OF PITTS

CST: 2001

FED Share:

ASSOCIATED PROJECTS: 43 I695-

GA Share:

$49,000 $39,000
$10,000
UNDERWAY UNDERWAY
$775,000 $620,000 $155,000

PROJE, CT: 431695- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 30/US 280 @ALAPAHA RIVER 1.2 MI W OF PITTS
ASSOCIATED PROJECTS: 431690-

FUND: BRIDGE

PE: 1997

0.22 /0.35

ROW: 2000

CST: 2001

FED Share:

GA Share:

UNDERWAY UNDERWAY
$700,000 $560,000 $140,000

PROJECT: 432070- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1999

LENGTH (miles / km) 0.26 /0.42

ROW: 2002

DESCRPT: SR 30/US 280 @ALAPAHA RIVER TRIB. 0.8 MI E OF SEVILLE

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$825,000 $660,000 $165,000

PROJECT: 432075- TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 2000

LENGTH (miles / km) 0.29/0.47

ROW: 2002

DESCRPT: SR 30/US 280 @ ALAPAHA RIVER TRIB. 1.3 MI E OF SEVILLE

CST: 2003

FED Share:

GA Share:

UNDERWAY $10,000
$650,000 $520,000 $130,000

Page 332 of336

STATE TRANSPORTAiioN IMPROVEMENT PROGRAM

--'" ,._9/2-1/-00--_._---

I
WILKES COUNTY

I PROJECT} 221740- TYPE WORK: WIDENING LENGTH (miles / km)

FUND: STATE 7/11.27

PE: 1993 ROW: 2002

DESCRPT: SR 17 FM MP 13.0-16.71IMP 23.88-26.28/INCL 3-CLVTS & BRDG I
. EXIST. LANES: 02 PROPOSED LANES: 04

CST:

'UNDERWAY $300,000
AFTER 2003

I PROJECT: 22225X- TYPE WORK: WIDENING LENGTH (miles / km)

FUND: STATE 0/0.00

DESCRPT: SR 17/10 FM CR 6/SMITH MILL RD TO WASHINGTON BYPASS/WILKES I
EXIST. LANES: 02 PROPOSED LANES: 05 I
ASSOCIATED PROJECTS: 222255-
I
I

PROJECT) 22Y260- TYPE WORK: WIDENING

.

I

LENGTH (miles / km)

FUND: NHS 0/0.00

DESCRPT: SR 17 FM N WASHINGTON BYP TO CR 193 - FOR FED PE; 222260 I
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATED PROJECTS: 222260-

PE:NONE ROW: NONE CST: NONE
PE:2001 ROW: NONE CST: NONE

$1,000

PROJECTJ 22Y264" TYPE WORK, WIDENING

I

LENGTH (miles / km)

FUND, NHS 0/0.00

DESCRPT: SR 17 FROM CR 113 TO NO.OF CR 50/ELBERT - FOR FED PE; 222264
I
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATiED PROJECTS: 222264-

PE: 2001 ROW: NONE . CST:NONE

$1,000

I PROJECT: 232300- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km) DESCRPT: SR 44 @ KETTLE CREEK 6.5 MI SW OF WASHINGTON

FUND: BRIDGE 0.24/0.39

1

I

PROJECT:! 245385- TYPE WORK: REPLACE BRIDGE

I

LENGTH (miles I km)

DESCRPT:' SR 44 @ FISHING CREEK 5 MI NE OF WASHINGTON

FUND: BRIDGE 0.22/0.35

PE: 1999 ROW: 2003 CST:
PE: 1999 ROW: 2003 CST:

UNDERWAY $10,000
AFTER 2003
UNDERWAY $10,000
AFTER 2003

Page 333 of336

STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00

WILKINSON COUNTY
PROJECT: . 0001118 TYPE WORK: RR 'XING LENGTH (miles I km)'
DESCRPT: CS 665/JACKSON ST IN GORDON @NS# 732714L LUMP SUM PROJECT

FUND:STP .0/0.00

PE.NONE ROW: NONE CST: 2001 FED Share: GA Share:

$100,000 $80,000 $20,000

PROJECT: 0001119 TYPE WORK: RR XING LENGTH (miles I km)
DESCRPT: CS 695/MILLER AVE IN GORDON @ NS # 732717G LUMP SUM PROJECT

'FUND:STP 0/0.00

PE:NONE ROW: NONE CST: 2001 FED Share: . GA Share:

$100,000 $80,000 $20,000

PROJECT: 0001120 TYPE WORK: RR XING LENGTH (miles/ km)
DESCRPT: CR 60/CLA YFIELD RD IN GORDON @ NS # 732720P LUMP SUM PROJECT

FUND:STP 0/0.00

PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:

$100,000 $80,000 $20,000

PROJECT: 0001122 TYPE WORK: RR XING

FUND: STP

LENGTH (miles I km) 0 10.00

DESCRPT: CR 183/GORDON/MCINTYRE RD IN GORDON @ NS # 732998T

LUMP SUM PROJECT

PE:NONE ROW: NONE CST:)OOI FED Sit are: GA Share:

$100,000 $80,000 $20,000

PROJECT: 221762- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 29/US 441 @ BIG SANDY CREEK S OF IRWINTON EXIST. LANES: 02 PROPOSED LANES: 04 .

FUND: BRIDGE

PE: 1992

I 11.61

ROW: 2001

CST: 2001

FED Share:

GA Share:

UNDERWAY $250,000
$3,750,000 $3,000,000
$750,000

PROJECT: 221766- TYPE WORK: WIDENING

FUND: STATE

LENGTH (miles I km) 4.4717.20

DESCRPT: SR 29IUS 441 FM S OF SR 96 TO THE IRWINTON BYPASS NEAR CR 8 I

EXIST. LANES: 02 PROPOSED LANES: 04

PE:NONE ROW: 1995 CST: 2001
GA Share:

UNDERWAY $6,403,000
) $6,403,000

PROJECT: 221870- TYPE WORK: NEW CONSTRUCTION

FUND: HPP

LENGTH (miles I km) 7 I 11.27

DESCRPT: FALL LINE FWYINORTH GORDON BYPASS FM SR 57 TO SR 243 @ LAKE

EXIST. LANES: 00 PROPOSED LANES: 04

PE: 1992 . ROW: 2001
CST: 2001 FED Share:
GA Share:

UNDERWAY
$2,250,000
$22,700,000
s18, I 60,000
$4,540,000

PROJECT: 222220- TYPE WORK: BRIDGE REHAB

FUND: BRIDGE

LENGTH (miles I km) 0.84 I 1.35

DESCRPT: SR 57 OVER THE OCONEE RIVER AT WASHINGTON COiJNTY LINE

EXIST. LANES: 02 PROPOSED LANES: 03

PE: 1998 ROW: 2001 CST:

UNDERWAY $21,000
AFTER 2003

Page 334 0/336

----;--------_.._ _ -- -

_

.

STATE TRANSPORTATION IMPROVEMENTPROGRAM

----!-----_..=--.,_.=------_._-,9-/-2_1./.0_0 --_._--------------
I
WILKINSiON COUNTY

PROJECT: 23143X- TYPE WORK: WIDENING

I

LENGTH (miles / km)

FUND: STATE 0/0.00

PE:NONE ROW: NONE

DESCRPT: SR29/US441 FROMCR471 TOSR 112/LAURENS-231430 I
EXIST. LANES: 02 PROPOSED LANES: 04 1
ASSOCIATr PROJECTS' 23 '430-

CST: NONE

PROJECT: 262470- . TYPE WORK: NEW CONSTRUCTION

FUND: STATE

I

LENGTH (miles / km) 7.9/12.72

I
DESCRPT: FALL LINE FWY ON NEW LOC FM SR 243 @ MORNINGSIDE TO US 441

I

EXIST. LANES: 02 PROPOSED LANES: 04

I

ASSOCIATED PROJECTS: 26247X- 26Y470-

I

PE: 1993 ROW: 2001 CST:

1
I PROJECT: 271298- TYPE WORK: HISTORIC PRESERVATION LENGTH (miles / km) DESCRPT: tITY OF GORDON RAILROAD DEPOT REHAB

FUND: STP 0/0.00

PE: LOCL ROW: LOCL CST: 2001 FED Share:

PROJECT: [34298X- TYPE WORK: PASSING LANES

I

LENGTH (miles / km}

DESCRPT: SR 18 WB MP 2.31-3.61 EB MP 7.0-8.5 /SEE TWIGGS-342980

I

.

ASSOCIATED PROJECTS: 342980-

FUND: STP 0/0.00

OTHShare:
PE:NONE ROW: NONE CST: NONE

UNDERWAY $1,800,000 AFTER 2003
$135,000 $108,000 $27,000

1

PROJECT: [343082- TYPE WORK: PASSING LANES

I

LENGTH (miles / km)

FUND: STP 0/0.00

DESCRPT: SR 18 EB FM MP 24.39/JONES TO MP 0.71/WILKINSON-343085

I
ASSOCIATED PROJECTS: 343085-

PE:NONE ROW: NONE CST: NONE

.
Page 335 of336

STATE TRANSPORTATION'IMPROVEMENTPROGRAM
9/21/00

WORTH COUNTY

PROJECT: 00005X2 TYPE WORK: INTERSECTION IMPROVEMENT

FUND: STP

ALBANY TIP #

LENGTH (miles / km) 0/0.00

DESCRPT: SR 133 AT COUNTY LINE RD AT DOUGHERTY COUNTY LINE;0000522

EXIST. LANES: 02 PROPOSED LANES: 04

ASSOCIATED PROJECTS: 0000522

PE:NONE ROW: NONE CST: NONE

PROJECT: 432145- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 300 SBL @ JONES CREEK 1.4 MI S OF OAKFIELD

FUND: BRIDGE 0.75 /1.21

PE: 1999 ROW: 2002 CST: .

UNDERWAY $10,000
AFTER 2003

PROJECT: 470895-' TYPE WORK: REPLACE BRIDGE

FUND: BRIDGE

PE: 1995

LENGTH (miles / km) 0.21 /0.34

ROW: LOCL

DESCRPT: CR 297 @ SWIFT CREEK APPROX. 2 MILES NE OF WARWICK

CST: 2001

FED Share:

GA Share:

UNDERWAY
$505,000 $404,000 $101,000

Page 336 of336

APPENDIX
.'

GLossARY OF TERMS

ATMS II.

'.

.

Advanced Transportation Management System; a computerized system that integrates video, voice, and

data management functions to collect information about the transportation infrastructure and performance

analysis 4s well as support traffic management decisions based on real-time information.

CMAQ I
Congestion Mitigation and Air Quality Improvement Program; directs funds primarily to areas that have
failed to teach certain air quality standards. Projects allowed under this program include mass transit improvements and high-occupancy vehicle facilities.

CST

Construction; phase of a project that includes the actual construction of the project. I I

DONORiSTATE BONUS

.

Donor State bonus: Donor states are states that contribute more to the Highway Trust Fund than they
receive b~ck in federal-aid highway programs. These states receive a predetermined amount based on a

comparison of a projection of all payments into the Highway Trust Fund and the amount received in

tum federal-aild apportionments. Starting with the state with the lowest return, states are brought up to the

level of

for states with the next higher level of return until available funds are depleted.

FED Share

..

I
Federal Share; portion of funding to be paid for with federal money.

GA ShareI

I

Georgia Share; portion of funding to be paid for with state money.

I

.

HPP !I
High Priority Project; list of 1,850 high priority projects specified by Congress in TEA-21. Funding for

these proj;ects totals $9.4 billion over the six years ofTEA-21. Georgia will receive $283.87 million for

40 projec~s.

.

HIGHW~Y TRUST FUND
Federal account established by law to hold receipts collected by the government, earmarked for highway I
programs and a portion of the mass transit program; supported by the federal gasoline tax and other user
taxes.

INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT of 1991 (lSTEA)

Transportation bill approved by Congress in 1991.

I

METROPOLITAN PLANNING ORGANIZATION (MPO)

I

Required by federal regulations in urbanized areas to develop transportation plans and programs;

I

responsible for developing the Transportation Improvement Program (TIP).

-

NEPA

National Environmental Policy Act of 1969; requires federal government to use all practical means and

measures to protect environmental values; makes environmental protection a part of the mandate of every

federal agency and department.

.

NHS National Highway System; consists primarily of the Interstates and other major routes. Includes a large percentage of urban and rural principal arterials.

NON-ATTAINMENT The 13 county area around Atlanta that fails to meet federal air-quality standards. Projects in the nonattainment area are not allowed to proceed if there is an increase in capacity of a roadway unless they were identified in the 1995 TIP for Atlanta.

OBLIGATION CEILING The maximum amount that a state is expected to receive from the Highway Trust Fund.

OTH Share Other Share; portion of funding to be paid for with money other than federal or state funds; generally provided by local governments.

PE Preliminary Engineering; phase of a project that includes the development of the concept, survey, environmental documentation and design plans.

ROW Right of Way; phase of a project that includes the acquisition of any necessary property for the construction of the project.

STATE AID LET Projects that are funded with state money.

STATE HIGHWAY SYSTEM Network of roads maintained by the state including road and bridge construction, maintenance, rehabilitation and restoration. There are approximately 17, 947 miles of state highways in Georgia which make up 16% of the total public road system in the state.

STP Surface Transportation Program; federal funding category that provides funding for projects on any federal-aid highway, including the NHS, bridge projects on any public road, transit capital projects, and public bus terminals and facilities.

TRANSPORTATION EQUITY ACT FOR THE 21ST CENTURY (TEA-21)

Six year transportation bill approved by Congress in 1998.



TRANSP10RTATION IMPROVEMENT PROGRAM (TIP)

In metropolitan areas over 50,000 in population; a program of federally funded transportation projects

proposed to be carried out in the first three years of adoption by the MPO. There are 11 urbanized areas

in Georgia - Chattanooga, Rome, Athens, Augusta, Savannah, Brunswick, Macon, Columbus, Albany,

Atlanta, ahd Warner Robins. The TIPS's are incorporated into the STIP as adopted by the respective

governments and approved by the Governor, with no changes.

W~RK TYPE

-category of project and source of funding

ATMIITS I
Advanced Transportation Management/lntelligent Transportation System; work relating to

computerized transportation system that supports traffic management decisions; commonly known

as/the NAVIGATOR System.

BicyclelPed. Facility: generally bike/pedestrian path/lane funded through a Transportation

Erlhancement Activity (TEA) project.

Btidges: lump sum funding identified for bridge maintenance or bridge painting

Btidge Painting: lump sum for bridge painting.

Btidge Rehab: bridge rehabilitation - work that will improve and/or widen an existing bridge.
C~pital: funding identified for the purchase of transit related items. I
Historic Preservation: restoration or rehabilitation of historic structures that have a direct linkage

tolt?e transportation system; funded as part of a Transportation Enhancement Activities (TEA)

project.

.

I

Interchange: work at an interchange.

Iritersection Improvement: work that will improve an existing intersection.

Landscaping. purchase/installation of shrubbery, plants, trees, etc. I
Lighting: lump sum funding for purchase/installation of lighting along a National

Highway

Systemroad.

I

Miscellaneous Improvements: identified for various projects that are not necessarily covered by

a sItandard category.

.

N~w Construction: new roadway construction on new location.

Operating: funding identified for the operation of transit systems.

Passing Lanes: passing lanes added along an existing roadway.

Pteliminary Engineering: the design phase of a project.
R~mp: construction work on a ramp at an interchange. R~alignment: improvements to the geometry of a roadway.

Replace Bridge: construction of a new bridge to replace an existing bridge.
R~st Area: construction of rest areas along state routes (Interstates). R~urrace and Maintenance: re-paving of a roadway and minor improvements
RR Xing: improvements to a road/rail crossing, such as the installation of gates, bells, lights, or

improvements to the crossing itself.

SJrety: work that is designed to reduce accidents.

Shoulder Work: improving and/or widening shoulders on a roadway.

Sitlewalks: installation of sidewalk.

. Siknals: installation and/or improvement of signals. '

Signing: fabrication/installation of roadway signs.

Special Studies: lump sum funding for planning and management studies.

'

TJrn Lanes: addition of tum lanes at intersections. I

Wiater Pollution Mitig.: lump sum funding for wetland mitigation site that were taken by

roadway construction.

.

I

Weigh Station: construction and/or rehabilitation of truck weigh stations. Widening: adding additional travel lanes to a roadway.

TRANSIT TABLES
!'

ALBANY

CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5307

pg"gmm;JQNiJ#IPI:fIIPiJJJi:JJiltii=iJili:iJii:i=iJitt:=iii::iltItt/ittFI'=iliiJJJJ: :lli,tllXiiQ1111iiJJ ::tii'JJJifir9.~{i}{t:i: $.J.lPA~i@tt:"}i'}tttlml,:t,:tt:ttm:tt::t'trtttttt:i'i:t'ttti:it=i@titt::t:'::t:ttt:iWi:l:t:ittitimt4QM:i.$.1tti:t't :::'tttJtQ.4Q;~:titti :l:::,l::i:::;':iii:;.;:::il:._

Transit Coach/Lease (4) 30 foot

$121,528

$121,528

$121 ,528

$364,584

Transit Coach Lease (2) 30 foot

$65,000

$65,000

$129,500

$259,500

Transit Coach Lease (2) 25 foot

$0

$26,534

$26,534

$53,068

Paratransit Bus Lease (3) 25 foot

$0

$0

$99,501

$99,501

Paratransit Bus Lease (3) 25 foot

$37,686

$37,686

$37,686

$113,058

Support Vehicles

$38,606

$38,606

$38,606

$115,818

Facility Modification - Ceiling TIles & Paint

$35,000

$17,000

$25,000

$77,000

Facility Modification - Pave Bus Parking Apron

$15,000

$0

$0

$15,000

Facility Modification - Pave Bus Wash Exit

$45,000

$45,000

$0

$90,000

$45,000

$0

$0

$45,000

Oil Water Separator - EPA Regulations

$38,000

$0

$0

$38,000

Parts Storage Bins

$0

$15,000

$0

$15,000

Fareboxes for Replacement Vehicles

$25,000

$10,000

$10,000

$45,000

IV

Capital Maint. Item - Engine Cradle & Dolly

$0

$0

$11,000

$11,000

Capital Maint. Item - Engine and Trans. Rebuild

$0

$0

$11,000

$11,000

Capital Maint. Item - Spare Engines & Trans.

$0

$15,000

$0

$15,000

Capital Maint. - Purchase TIres

$10,000

$10,000

$10,000

$30,000

Maintenance Tools and Equipment

$5,500

$5,500

$5,500

$16,500

2-Way Radios

$5,000

$5,000

$5,000

$15,000

Fuel Tank Testing

$1,000

$1,000

$1,000

$3,000

Bus Shelters Non-Advertising (4)

$0

$0

$18,000

$18,000

Office and Facility Automation

$3,000

$3,000

$2,500

$8,500

PRQ4.lgnAQ$.]:tt::ttttttt:::t::::tn::t:::t:t:'::ttt::t::t::t::tmtttt::::::::itt't:m:tttiIlt i:ti:t:IIm$ll~P4~i :t::':itttt$.41:'-~Q~'ii :I':':tI:t:::$~g~~~r: 'ii':t:::$ll4$.~~i~:::

FEDERAL COST

$392,256

$332,683

$441,884

$1,166,823

STATE COST

$49,032

$41,585

$55,236

$145,853

LOCAL COST

$49,032

$41,585

$55,236

$145,853

DOT DISTRICT # 4

CONG.DIST.

2 ROC

SWG

'"

"

OPERATING ASSISTANCE SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5307

===-- ::i$.WIR:riJtft:::i::{:i:i{::f:if;::::i:::::::::f::m:::::i:m:::i:fi:i:::::::::::mt:r:::::::::ff;::::i:::::::::i:fi:m::::i::{{ :::i:::::::::::ml.lt~$.~}{iffi:: :i:'::r"::i:'~o.tt(t$.$':::':::i:ti::::'
:"'(U~eD.$:::ge.tUQQ:::::r:::i:::ir?m::::mrr?l:f111trr:i1111 1:r:::lrrfiINUtf1IflH': r::':fff'::I:MJ),lJ?:'1:iI:::

07/01/00 - 06/30101

$1,398,392

-

$1,398,392

07/01/01 - 06/30102

$1,398,392

. $1,398,392

07/01/02 - 06/30103

$1,398,392. $1,398,392

f:e.aau.lrRQSiitrrrirr:irrrrm:::::::::;r:1:m:::::::::m:::rt:;rr:::f11 r::::::::;:::1$l:;atl~$s.~::': ::r:::::::H$1:~$$.1~2r :rm:::::::;::::$1WlS,tM1S,1:::: :fffff$4~1:9$~l'7~':':

FEDERAL COST

$362,591

$369,133

$362,591

$1,094,315

LOCAL COST

$1,035,801

$1,029,259

$1,035,801

$3,100,861

w

DOT DISTRICT # 4

CONG.OIST.

2 ROC

SWG

CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5309

1::::$.1)JPt,m:::):::::tmt:m:::':::'::::::::t:::::::::::@:::tt::::::::::::::::t::::tt:::::::::::::l;:::{t{:t::::::::::::::::::::::::::':nf::::::::mr4J!14A~O)W:W:::::::t::::::::::::~Q41~$.1:::::::)::::::::H::::::::::::::lt(}'PQ~:tt$ W: }: ::W

't:mmI:::::::::':EY:Q1tmI:tI:t' /I::::"::UtYil2'III:::tI:: :::ttt:II':Fyn.att::::'ltt[::I::::r:ITQlAUIII::@

DESCRIPTION'



AdministrationlTransfer Facility

$3,500,000

$0

$0 $3,500,000

Building Modification

$50,000

$50,000

$50,000

$150,000

Vehicle Replacements

$500,000

$500,000

$775,000 $1,775,000

IfR8QQ.et:::~lt::::::;:::tI:t:::tt::'tf:r::::::::tn:::::::::::t:::::::::::r:::::::::::r::\:)'C:;::::;:::It$.4~(l$.P~mJP':: :::::::::I;::::::~$.o.JQQ.\:: ::::::::::::::::I::I$.$.~p~Q.(}'Q::: :::::::t:tt$$~4~~mmt

. FEDERAL COST

$3,240,000

$440,000

$660,000

$4,340,000

LOCAL COST

$405,000

$55,000

$82,500

$542,500

STATE COST

$405,000

$55,000

$82,500

$542,500

DOT DISTRICT# 4

CONG.OIST.

21 ROC

SWG

~

'.

.-,,-.

CAPITAL SCHEDULE IN ALBANY FOR ELDERLY AND DISABLED Section5310

===-= ::$.1lU\tll::m::::::::::::::::::::tf'ffflftt:::t:ff@::mf:::::::i::JI:::::f::f:tt:f::::::::::::::::::::':::::::::::::: :t::::::::::::t4V1rf.l:$.lI::t:f: ::::::Ittl\!f.1.1:Jj:::::t::tt:
:taes.eBJRmQN.lff:tt:::fff:tttt::t::n:::tlm:::'M:l::t:::::::::::f::::f:,fff :::::::::::::tl::::':':SQt:::::::':::::::::f:t ::::ltrm::::::::::fiP2m:::::::t:::j:::::m::

Purchase of Service

$24,476

$24,476.00

Purchase of Service

$25,700

, . $25,700.00

Purchase of Service

$26,985

$26,985.00

:te8.aa.EYlB~QS.llfffffflmfI11M1Il111:@t:::::fff::f::If:t:::::::::tnfm:::::'::::::::$%.I.~4:1!~r:: ::t:ff:l:tltt$.~$.JZQ.lt mt::::t:mttt::{$2$lt$$.f ::::::'f:Jl:::flJlfiZiU$.]lf:

FEDERAL COST

$19,581

$20,560

$21,588

$61,729

STATE COST

$4,895

$5,140

$5,397

$15,432

VI

DOT DISTRICT # 4

CONG.DIST.

2 ROC

SWG

"

r'

ATHENS
6

CAPITAL SCHEDULE FOR ATHENS TRANSIT SYSTEM Section 5307

a,g$.eSlf:lf.tQB.m}:lt:::J:(!::I:t:l::tttJJ::::::m:::l:J=:tltttIII!!I::III:: :&:TU{,#mI=IIIII::::II:=:::lm::J:::II:lIIImm::::l=::=!!=::!=:=:;m::n::w::::::I=:::IJ::IJ::JJ=::

::::::::m:::::ttfiIH~1::::1}II:I:! I:::::IJm!.1=1.J:~Jtlt

::I::1t:!I::f,\Y=:=12=!I:=}}::mr =lJ!=:11=U1U:o.Z$.:::::::!=IIi

.:!:.:I:I!I:::.:I:;~=~i:i:l:!I:I:I!I!I!._

Transit Vehicle (5)

$250,000

$500,000

$590,000

$1,340,000

Demand Response Vehicle-Vans (3)

$62,000

$62,000

$62,000

$186,000

Capital Maintenance

$92,800

$92,800

$95,600

$281,200

Replace Maintenance EQuipment

$51,111

$0

$6

$51,111

Office EQuipment

$0

$5,700

$0

$5,700

Supervisor Vehicle (1)

$0

$15,000

$15,000

SSQUSllttlQS1NJIliIlI:llIIliI:::::::I:!i::n::::::t:::::::::::I:J::::t:::::::II :II:tt=::I=::::$A$5.a~4:t ::;t::::tt:Il$.$.!t$.~$.J.ur t::t:J::t:IIJ.Z4Z;$UQt :::mm::::::I$1.:Ult$~QW1.I:

-..l

FEQERAL COST

$364,729

$540,400

$598,080

$1,503,209

STATE COST

$45,591

$67,550

$74,760

$187,901

LOCAL COST

$45,591

$67,550

$74,760

$187,901

DOT DISTRICT # 1

CONGo DIST.

11 RDC

NEG

~.
"

,,--
I~

OPERATING ASSISTANCE SCHEDULE FOR ATHENS TRANSIT SYSTEM
Section 5307
~=-- ii'i$';!P!WloWi"ii'fi!i"ii'i!@ifIi@iiiiIi"!i!}ji!iii,ii'!i,im;i'iIi!{IJiJIi;@@III@i!i!f!:iit:t::'::!:!':::::!iii~!g;t(J.;?~i':I::::' :::::ii:f:!:1imj~Z~g::I:!I:iii
}QP]iBAilllNSfee.SlQPr:}::i:;!:}i::r::ir::rr:!r:!:!:!:}}}!:!r::r:rt}:}} :rr:!!:!rreM:~n::::!::r}::r: :::::i::::::!:'FM::;qg:!}::}}!:r

07101/00 - 06/30101

$2,453,400

$2,453,400

07101/01 - 06/30102

$2,543,400

$2,543,400

07101/02 - 06/30103

$2,502,468

$2,502,468

}RRQQE:Qi:!QQ:S'l!t:!It:i:}}}}}!:!:}!}ii'::i'::I}!i'::i':::}::W{:!:}}!!:::i{trr: :::::i:::!!:}}$2msamw::: :{!{{::i$2~$.4.aili401::: ::::::{::::'::!::~~$n~~4.$a:i: ::{{::::::!:::$7~4.'!I.~~~${

FEDERAL COST

$454,743

$446,200

$454,743

$1,355,686

LOCAL COST

$1,998,657

$2,097,200

$2,047,725

$6,143,582

00
DOT DISTRICT # 1

CONG.OIST.

11 ROC

NEG

CAPITAL SCHEDULE FOR ATHENS TRANSIT SYSTEM Section 5309

:);)I$Qt1,ett&lf;\rm:;=::::::::::::I:t::ttIm::::t:::::iIWf:lttl::::::::t:;;t:;::::r::::::::::: ::::::::=:::::;:::::::::eM':ll::r::r:::::=:::::::::: ::;;:::;:::::::::;:;l!l1::().~::::::::::::::;:::::::m t:::r::::::::::::::f;1::J$.m:r::::::::r:::: ;:::::::::::::::::::1:0111;{::::;:::::::::::::: rS:T:D.1Mltrt::::::::::::::::mttr:::t:n:::):::I::ttrn::::::i:I):=rtm:::)rr::rr:):::::::::::::I::::::::)=:rj:::I:tt: r::;:;::::::tIQIII1::::::::)::::;:::::::: :;:::::::::::::;:::;1)P:1:n74:r:I;rIt :rI))::mIn~l1::1:$t:rjm

Transit Vehicles (6) Multi-Modal Transportation Center

500,000

500,000 1,199,000

500,000

1,500,000 1,199,000

rgf:l<>.g~~1J;rmsn:::::;;rrtj@=:t=::::::::::::t:;I:::!:::::n:j:::::I:=}:::tt::::j:r::IfJ::::J:I:::W::::::::;::rJf$QJ.;'b.~lQt :::~:t::::::::::::i:a:~I9.:.rOO~{ :;:::::::::::rrtrt$f.p.HmO:::: !::::r:=::::!:::::t~;9,S:JD.U~r

FEDERAL COST

400,000

1,359,200

400,000

2,159,200

LOCAL COST

50,000

169,900

50,000

269,900

STATE COST

50,000

169,900

50,000

269,900

DOT DISTRICT # 1

CONG.OIST.

11 ROC

NEG

\C

'-

t.

t~

CAPITAL SCHEDULE IN ATHENS FOR ELDERLY AND DISABLED Section 5310

Purchase of Service

I! :!: ! :!!l~!;~ ~ ;~:! ! :! !:!l:!: ! :!:::!::!ixQQQ!1:$$Iln':: m:::::::!::rmQm:n::1:~':::::::::!:m! ::::::::::::::::::!:6::P.~t::::::::::::::::::::: :::t'!':!"::::!::::EY1::0a::t::'jtJ:::: :::::I::::::j::jJ:Qi.AU:rttIj!

$20,503

$20,503

Purchase of Service

$21,528

$21,528

Purchase of Service

$22,604

$22,604

'q1B~Q..e.1t~QStm,::::':t:'r::r,t::':::::::t::::::,::::::::::::::::::::r::m::::'['::::f:mt:r:::: j:j::m:mtjf::::::::j:~t).~9.o'~::: !:,::::j::::'I::I:j:::::$~j:~$~~:::; j::!:j:j:::::!:::t:::::,:::j:$~~~~Q4::: ::f:::f:::::::::I:::::::~A~~~:::

FEDERAL COST

$16,402

$17,222

$18,083

$51,708

STATE COST

$4,101

$4,306

$4,521

$12,927

.....
o

DOT DISTRICT # 1

CONG.OIST.

11 ROC

NEG

ATLANTA

MARTA

CCT Douglas County

Gwinnett County

Rural Programs

x

!:"

Elderly & Disabled Programs

,~.
11

ACCESS TO JOBS/REVERSE COMMUTE PROGRAM Section 3037

/

Program Costs _

$2,000,000

$2,000,000

Program Costs

$0

$0

Proaram Costs

$0

$0

l$lilQijj~ $1,000,000 $1,000,000
-tv

DOT DISTRICT # 7 I CONGo OIST. 15,6

ROC .

ARC

h

~.,

~~

CAPITAL SCHEDULE FOR METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY Section 5307

!!!!.i:!:!;!:!:!:!ii=~i!:::!!i::!!:!:_ :U.~QfiURr.tt1I~1111tt:r:rr:1111:~rr:::~r~~rm::::~::t11t111r:::11111 :::n:~:~:~rrr~:::1111::::::111: f}:~~t}rFMH~Z]::t~rr:}

rrn:JltUUUn3.QnnnJ: $;miMirrrrrI1:Jtrr:1::fr:J:r::::rrrrr:rrr::rr~:::rrm::::n::nrr~::~:::J::~::::::::r:

I:1~nnmQo.QO:$lnl:nr::

Vehicle Overhaul (Bus/Rail)

.

. $4,833,287

$4,833,287

$4,833,287 $14,499,861

Associated Capital Maintenance

. $8,047,563

$8,047,563

$8,047,563 $24,142,689

Tools and Equipment

$1,000,000

$1,000,000

$1,000,000

$3,000,000

Security Equipment

$1,000,000

$1,000,000

$1,000,000

$3,000,000

Line Structure Rehabilitation/Renovation

$500,000

$500,000

$500,000

$1,500,000

Facilities Rehabi Iitation/Renovation

$525,000

$525,000

$525,000

$1,575,000

Environmental Rehabilitation/Renovation

$412,684

$412,684

$412,684

$1,238,052

Maintenance and Support Vehicles

$425,000

$425,000

$425,000

$1,275,000

Computer and Computer Related

$100,000

$100,000

$100,000

$300,000

Training

$130,000

$130,000

$130,000

$390,000

Preventive Maintenance

$21,665,489 $25,454,858 $30,696,194 $77,816,541

.....

Bus Replacement Program

w

Transit Enhancements

$1,000,000 $500,000

$1,000,000 $500,000

$1,000,000 $500,000

$3,000,000 $1,500,000

:a.b.itikRt.6Jaa.tsprat6.nj}:r::j}II:Ij}IIIIIIIItm::I1:1I11I:::I Imtr$4UUJ9.~o.23.r :~~~rr::$.4.3.~$28~a$.II: ~::rrn$4$~1:6.$~Z2$.t :::::::$1aa.~2a1!a:4ar

TRANSIT PLANNING PROGRAM

Regional Transit Planninq

$807,825

$807,825

$807,825

$2,423,475

Short Range Transit Planning

$1,633,505

$1,633,505

$1,633,505

$4,900,515

Special Projects Planning

$1,000,000

$1,000,000

$1,000,000

$3,000,000

Long aanoe Transportation Planning

$968,670

$968,670

$968,670

$2,906,010

:i.t4.ti$lt::e.!;mmqgl~~(MmmtLqMt:I~:::::::::::::r:::::::::::::::~:~::::Im:: ~:::::::::~:~::::::::$.4t.4j::U~lPm: :~:::~:tr:::::::$.4.~~1ij~Ann::~: :::::::::::~:::m::$4.;'41:Q~QU.AI ::::::1:::::$j~~~atnnlPr

:B'B.QUr;$.;~:.$.lmIIIt}Il::Jlrr:::::::::::t::t::tt1::f::::IJtJI::~:::::::I~:I:~:I::::::$.4.4~$4$~~~::: :::::r::~~$AI~~~I~~~~n :1:1:$$.~~$7$it~$.11 t{$14.~~4.~ta:4~::

FEDERAL COST

$35,639,218 $38,670,714 $42,863,782 $117,173,714

STATE COST

LOCAL COST

$8,909,805

$9,667,678 $10,715,946 $29,293,429

DOT DISTRICT # 7

CONGo DIST.

4,5,6 RDC

ARC

CAPITAL SCHEDULE FOR METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY 5309

:nt::nFfIJA,tttItt Qe$QB.JeI.~QNIIIIIIII:::::::::nn::::::::nn:::t:::III:i:III::t:::::IItttttntIIt :IttttJP(J~lnttt::t: ttttt:Fr~tttti:: nnn:::::::f::Q~:nntti

FJJjd:::f#.ij4.w..ytlr:tttlittIttttt:mrr'ttttIttt:$.llp:~flriir rrr::rlQ:i~Q7Wttti iimHtt~~~$.t:Itt: ttt:m~~~ZI:tt:

Ashby Station TOD

Line Structure Rehabilitation

$2,500,000

$2,500,000

$2,500,000

$7,500,000

Station Rehabilitation/RenovationlFare Collection

$2,500,000

$2,500,000

$2,500,000

$7,500,000

Rail Car Rehab/Retrofit Propulsion System

$17,500,000 $18,125,000 $18,750,000

~nJ.~'(RJ~J.M'(tp.t9.~a~ijlt:f::f::t:::::::::::tr::t:::::::{::$J1~t:::t}::::::::::::::::t:!1D.;i;m~rg:::t::: ::t{ir7Q?~~t:@Ht ::JJ::::;t()M~~r::ff

Procurement of Clean Fuel Buses

$4,000,000

$4,000,000

$4,000,000

BilU'Jivj::$.liJifttttttttItIIItttitt:::::t::::It:::::rt$TIPI:tttt:: t:ntflQ7~qp.tttrt ::r::::I::[QQq~4rttt mIttIt~~it:::tt

$54,375,000 $12,000,000

Corridor Study: South Dekalb-Lindbergh Study

$950,000

$0

$0

$950,000

North Line Extenslon-Dunwooay to North Spnngs

and 56 New Rail Cars

$44,625,000 $31,250,000 $18,750,000 $94,625,000

Iwest Line Alternatives Analysts and Deis: Holmes to

Six Flags

$0

$2,000,000

$0 . $2,000,000

'~ "'"

eR~eo.x'.~T@f{ittfmI%:mm:f'::f::::{::r::::::r{:::::@mm:fnll:Ii': Jfmmift.q~~P:

.. P~~1:{t~

.i.: J~f:i.Milmi.: ::@}J.17..~$)~:g

FEDERAL COST

$57,660,000 $48,300,000 $37,200,000 $143,160,000

STATE COST .

$0

$0 .

$0

$0

LOCAL COST

$14,415,000 $12,075,000

$9,300,000 $35,790,000

DOT DISTRICT # 7

CONGo DIST.

4,5,6 RDC.

ARC

h

..

_!-i;

CAPITAL SCHEDULE FOR COBB COMMUNITY TRANSIT Section 5307

Qe$.;RJRlJ.Qt.Ulf!ll@ff:!lmf!:fff~:::!~::!~::ff:lf::::::~:f:l!::lm!{{::~:III@ffff:f!~ ffffffg'tnf::~IIII:~: :~:::~~:~~I~::~~~:FM:~lg:II@:::~ff ~f::!:::f:~ffEM:J>,a:!IIII{m {::ffi{r.Q]A;I:.:::!:f::~fi $mJfM#{{l:;;f!I:!:::!jm;:Jfilf!::::~ff!:::f:l:::::!I::~f!:!:ff!:f::::f;::f::!::l::!:::j::::::::l:!:!::::~::::!I{{tfff ;:::::t:::jf?QZ~P.3!11{@f ~ljff::fZQi~:::tfj~f!: ::~::!:::!:!:!:rrQ~$.::j:f::::f:j

Transit Center

$1,000,000

$300,000

$200,000

$1,500,000

CNG Fueled Support Vehicles

$50,000

$25,000

$25,000

$100,000

Transit Enhancements: Bus Stop Improvements

$400,000

$100,000

$100,000

$600,000

Computer and Computer Related

$100;000

$50,000

$60,000

$210,000

EducationlTraining

$20,000

$10,000

$15,000

$45,000

Perventive Maintenance (including upgrades)

$4,960,000

$2,620,000

$2,740,595 $10,320,595

Capital Projects: Bus Replacement

$0

$640,000

$960,000

$1,600,000

Capital Projects: Paratransit Vehicle Replacement

$1,050,000

$0

$0

$0

Fare Collection System

$300,000

$100,000

$100,000

$500,000

Capital Projects: ATMS and Related Equipment

$370,000

$100,000

$100,000

$570,000

Capital Projects: Paratransit Operations

..-
Ul

Transit Planning Program

$1,357,222 $600,000

$760,903 $300,000

$700,000 $300,000

$2,818,125 $1,200,000

Capital Cost of Leasing/Facilities

$300,000

$150,000

$200,000

$650,000

RaQ4Egl1QQ$mflt::::~~:::~:~:{f!:ff::f~f!mf::!:::!t:!:f!:IffIftt{j::::!:;:'i!:::Iff::tmff:::mf$.:1J:Mi~i~212} ~f::~:ff:$.$.~1.~~l$.p.af :'tm::f:::$.$.~'$.~l$.$.$.f ::::::::::::J.aq;11all~:::

FEDERAL COST

$8,405,778

$4,124,722

$4,400,476 $16,930,976

STATE COST

$1,050,722

$515,590

$550,060

$2,011,372

LOCAL COST

$1,050,722

$515,590

$550,060

$2,011,372

DOT DISTRICT # 7

CONG.OIST.

6,7 ROC

ARC

CAPITAL SCHEDULE FOR DOUGLAS COUNTY Section 5307

i:!!I:!:I::::!!r:::i:=~iijr!'!r:r:r:::r:r:_ I(n;S~8.lemlgli@t:i:Wfm:fWWW!:W::w::::r:i:i;:i:WW!:!;:!tt!!it:1t:::WifitNNfW :::::;;'tti:::W:i5Mi])'WWW::W:@I:: :t::::::::::I::ai'!!n~WfWii:W:ii:;
:::fS'-lei:JI:I:::IIi::'I:rrrrrWWrrrflMII:r:t::::Wii::::n::':'lrr;rtlr:::::::::::III:: :::;:::::"::r::::tQ7$.9~;IIII::: :;::::::::::::rt1itrt,g~\lJ:::::::::::::'r

Park and Ride Multimodal Terminal

$1,334,965

$375,000

$297,500 $2,007,465

City of Douolasvllle Mini-Bus Study

$40,000

$0

$0

$40,000

Van Purchase (19 Vans)

$85,000

$119,000

$140,000

$344,000

Terminal EQuipment

$50,000

$0

$0

$50,000

Computerized Data Collection System

$50,000

$0

$0

$50,000

:::RB.~U.e.;;lt~T:E:::::m::::::::::::::::::::::':::::::::: : ;:: : i:'I::::::: ::::iii: : : : : :'::I::::i:::::::::: ':: :::::::III::::::$1!~II;"&.$: i:i:::::::liI::::::iII::::$.;1,14~lm~ ::::::::::::I;:::::=":::$4.a1~po.u :::::::::::::::::::$.Z4~11tf:$P:::

FEDERAL COST

$1,247,972

$395,200

$350,000 $1,993,172

STATE COST

$155,997

$49,400

$43,750

$249,147

LOCAL COST

$.155,997

$49,400

$43,750

$249,147

-0'1

DOT DISTRICT # 7

r
CONG.DIST.

7 ROC

ARC

~

..:V

CAPITAL SCHEDULE FOR GWINNETT COUNTY Section 5307

:\:!~1:!:!:\;:::!;ii=:~i\!:\:!:::!:\:_ lQS.$.'IIJPT'QN::::r::::rr:~:::':r~:IIII:l::l:::":llllI::l:r::::}::II::IIII::::IIt:::l::::::::::~:IIII IIll::ff:FM:nJr::r:rli :II::::rr:::~::EM:u.~::l~r::ll:
:::S:OOeWKlrIIII:::::,:r'ir:::r:'Im:::':'::::::'}:II:::i:::illllll;III~'r:}::::l::::::::~::l::i::':::mml}:'}~ ~IIII:}::'a:Q71$.$:iIIIIr~ :~~rrII:"1Jl71.$71'rr::l

Transit Center

$1,326,745

$0

$0

$1,326,745

Preventive Maintenance

$1,000,000

$1,900,000

$2,300,000

$5,200,000

Tools, Equipment and Markenting

$0

$578,710

$340,825

$919,535

Transit Enhancements and Passenqer Amenities

$23,503

$25,040

$26,675

$75,218

CNG Local Buses and Bus Related Equipment

$7,731,500

$0

$0

Diesel or CNG ADA Buses

$700,000

$0

$0

$700,000

Transit Enhancements and Passenqer Amenities

$106,300

$0

$0

Contingency

$143,163

$0

$0-

$143,163

CNG Fuelinq Facility

$1,468,442

$0

$0

'IBRtmf$.elrPQS1HJ'mHf:H:l:HfIfnfm::::;:m:m::::HHffHIfIIl'if:'iffUF: ~Hi:I:~$.1:gt4'-$.:~.a::': ;:::::::::::II$t.~$.Q~~7.$l:f :::mlrl$~~Q$.7:UiQQI ;mff:::$~h$.$.4.~SJ.n

FEDERAL COST

$9,999,722

$2,003,000

$2,134,000

$6,691,729

STATE COST

--..J

LOCAL COST

$1,249,965 $1,249,965

$250,375 $250,375

$266,750 $266,750

$836,466 $836,466

DOTDISTRICT # 7

CONGo DIST.

4,6,11 RDC

ARC

CAPITAL SCHEDULE FOR GWINNETT COUNTY Section 5309

I,~r~r~~,a'',!fl!1!L~~E!RI'ij!.lf.a",lJJJ't1'I!~~J"t"'~"~';'~'j'i\.'!i Pil:ru~#:\E.,M;::~,10c.2,i\lilm,.,i,"i,<J~~1~' Iii~i*E~1l~iffu~f1ID(tL;",f~""a...1..1F!..~lf~1I'L.~!IE1il';1[.Ii'.r"tJ"~,m."~.,l~,!,.i\ll~~~
. . '~j~,!i~r~4l*Ili..a/:tOIiIiQ?!:~l~ml~a ~~'~fl1~~iH~B;l,:1.')t~D:4~a.~B;.}Ft~mj~r.~

$6,400,000

$0

$0 I $6,400,000

.....
00
DOT DISTRICT # 7

$0 I$6,000,000 I

$0 I $6,000,000

'I~mI~~Ii\!lrliJ'{t~,t'!6"i"1'"l"I,,.l,nm~oJltt;~~,.,"w",,.,,,~,",(,",i,,bf:lQ:,,D,,,',~."!lliTlll:'i\,Gr~iI~III..1ft~~~~I'$#,f"~.l,$Jil)i"I"":,,i'2N,9..'t'~lMQf"<()'., O. ~O~

$5,120,000 $4,800,000

$0 $9,920,000

$640,000 I -$600,000 I

$0 I $1,240,000

$640,000 I $600,000 I

$0 I $1,240,000

CONG.OIST.

4,6,11 I ROC

ARC

h

".

.....J.!

CAPITAL SCHEDULE FOR ELDERLY AND PERSONS WITH DISABILITIES ATLANTA AREA Section 5310

iC.QU:N1IIImmI:I$.llRlf::JJI'mJJJqJ::JnEV::~Qnn::J':Ir['JJEt;~ijQ2JWillrnm"IDf~$;,tI'J~F:ni!J;raT4g)':It

Cherokee

16V0725

$20,503

TOOOO01

$21,528

TOOO020

$22,60'!1.

$64,635

Clayton

17V7041

$32,805

TOOOO02

$34,445

TOOO021

$36,1671

$103,417

Cobb

17V7042

$86,112

TOOO012

$90,418

TOOO022

$94,9391

$271,469

Dekalb

17V7043 TOOO013

$131,219
I

$137,7791

I

I

,

TOOO023

$144,668

$413,666

Douglas

17V7044

$14,352

TOOO014

$15,070

.....
\0

I

I

ITOOO024

I

1

$15,8231

$45,245

'Fayette

13V7039

$14,352

TOOO015 TOOO025

I

$15,070

$15,82~

$45,245

Fulton

17V7045

$178,375

TOOO016

$187,294

TOOO026

I

$196,6591

$562,328

Gwinnett

11V7028

$57,408

TOOOO17

$60,279

TOOO027

$63,2921

$180,979

Henry

"3V7040 TOOO018 TOOO028

$16,402
1
I

$17,222

$18,0841

$51,708

Rockdale

17V7046

$10,251

TOOO019

$10,764

T000029
t;~&~~26~~780%)
STATE FUNDS (20%)

rn/:}/:f~::~::~~.

$11,302

. $32,317

iJWJJ:k:$.$:e~i$..eQ:)':':':r))):$Q.Wi$..et: "JJ:iJ:)$Vl'lMQ.QQ

$471,895

$495,489

$1,416,807

1

$112,356

$117,974

$123,872

$354,202

OPERATING ASSiSTANCE SCHEDULE FOR NONURBANIZED AREA TRANSIT (Atlanta Area) Section 5311

PAQN.T:::IU: ~[.mWMf::'\:::::::::::::t{t:::,:}t}:JUJ@J}f#@}Ift::n::\ \::{it::: )ft:{tJtll~l'tttt: ::::ttttJil.@Qgnftft: ,:r:'t':::::i@FX::Q$::::t:ttt :::::t:@::nrQr.lt.t':rttJ

Cherokee 6B9005

$75,200

6B9006

TOOO046

Henry

3B9005

$82,968

3B9006

TOOO055

OOi.m4\(J~O$1t:$.li:::H:fli.,ttl}:Ur:tHi.miniW:Wl:::H:l:i::JJltJd::,:,:::Htt::: tiJiJ::'}tl~:~"~~;~:':

FEDERAL COST (50%)

$79,084

LOCAL FUNDS (50%)

$79,084

75,200

$79,200

79,200

$78,000

78,000

82,968

$87,120

87,120

--

.

$91,474

91,474

:t~I~Ql :Itl1?t$lfi~;41.4:~..~~~~~{

$83,160

$84,737

246,981

$83,160

$84,737

$246,981

CAPITAL SCHEDULE FOR NONURBANIZED AREA TRANSIT (Atlanta Area)

..

Section 5311

otv

~.::.:....:..:..::..,::.~~~:::'i~g~!tkt':i::'::::::J:::::i::tttt:::::::::::::t:t:::t:::::ltt::::~:tttttJ~:,tP.?:::tltt\ ::::::::::::::i::::tF:y'!:9~tt:::tt~

STIP #

6C9005

6C9006

TOOOO46

Cherokee . 2 Shuttle Vans with Lifts

$0

$0

$104,000

$104,000

2 Shuttle Buses

$90,000

$0

$0

$90,000

Henry

STIP# 2 Shuttle Buses (Diesel) Shuttle Bus.

. 6C9005 $70,000

6C9006 $43,000

TOOOO46

$70,000 $43,000

-

-

.

mQIAI4.:@QT:'if:f'::'lf::'f':'I@ltt::"lt'::mttt:'::ffffftttm::::t:l::f::::ff:: rrrr:. .J'P.~QQQtttr @}}fLl.4.~~9.Q.Qt:))t ::f)::::$lP.4;.QP9.:tt'U ::U:'::$~1}QP9.:)Jfm

FEDERAL COST (80%)

128,000

,34,400

$83,200

$245,600

STATE FUNDS (10%)

$16,000

:ti4,300

$10,400

$30,700

LOCAL FUNDS (10%)

$16,000

$4,300

$10,400

$30,700

~\

AUGUSTA
. ----
"7
21

CAPITAL SCHEDULE FOR AUGUSTA PUBLIC TRANSIT Section 5307

:::!~.!!;!.!::.[::=:'=~~i;[!:;!:!::::::!!_ OESUalemlQN'@f[::tIIII':!Itlff!::t':::':ff'tttttttttttttlff!:[@['f::f:'fttteM1Q1II!ttttt I:':[:[I:ftfFOO::(l2It'!'tiI:f
:$TJ.Rl:.Jf[JJJ[IJ:::::::::tf::::H@liIIllHH@HHHHiH~tlHf!JlfffIf'l'lifJtm ::IH1:[Wa:D.2024.Ht@It::! ::tt:f:::t2Q~a~rf:t~II.

Transit Vehicles

$650,000

$1,300,000

$0

$1,950,000

Capital Maintenance Items

$50,000

$50,000

$50,000

$150,000

Preventive Maintenance

$1,000,000

$1,000,000

$1,000,000

$3,000,000

Project Administration

$11,000

$11,000

$12,000

$34,000

Contract Continoencies

$95,900

$96,320

$0

$192,220

ADA Expenses

$200,000

$180,000

$237,500

$617,500

Shop Equipment

$5,000

$10,000

$5,000

$20,000

ADA Equipment

$2,000

$5,000

$2,000

$9,000

$400,000 FY 00 :Ba.tm:ec.J.t~b$.1il:[:m:::mmmtUtJ!:!M;:mt:!:1I:MI!JttfIlt!!1~ i~ ~::~:!!::f:tll"~QI:3~B.QQ~:! [:::::::::Il:::$~l.'$~~$;iQ:I ::tt::::::::~!~:$i:~3QS.1$.1U.!:: m:!~!:It$.$i$7.2~ZaQt

FEDERAL COST

$1,611,1"20

$2,121,856

$1,045,200

$4,778,176

N

STATE COST

N

LOCAL COST

$201,390 .$201,390

$265,232 $265,232

$130,650 $130,650

$597,272 $597,272

DOT DISTRICT # 2

CONGo DIST.

10 RDC

CSR

~

.

'J"i

.'

CAPITAL SCHEDULE FOR AUGUSTA PUBLIC TRANSIT Section 5309

$JrnRTii~l~~ Transit Vehicles
A'B~1.lEGJfle<:f.sml!t~~~ i'~,......""...(;_'~N~~.. d .(; ~....,~~,,_;o;;N~N~~n...~~~ FEDERAL COST STATE COST LOCAL COST
DOT DISTRICT # 2

1li~t:f~f:b~l~~lrI.;-"(_Jv,O_O..~.v.",, ,51l.,t>~s,,,,~,_@, ~:f~\*mJtmoE_l,.j""'".o~,_~.;t.~7.,l.i..),.iJ4ft;..,."-!B_i:1'~1l'a:1~';~)ru~~_t,,,o,.",,(,Qj~ ~.4r""~('3__"iJ~!l!mitl%~f.\ti 1t~"~~

$500,000

$500,000

$500,000 $1,500,000

!\LjftD""*"l""l>,r.t~_&.:,,o,,OI~."o~o,,o,,i" 1rlItiiti~.,;!;lS~,~,i,.1$r$,.,;,'."",O. O"'W''O,'OOJli. m.A~lfii!i',]'Jfii1"~,"f~14$'','"'.',O.O"~.(,j.,O,'$O'~',11l:~,~~,~l~l~I!l,f."f,i~(_j,o.1n"''Q"Odo''1'''i~

$400,000

$400,000

$400,000 $1,200,000

$50,000 I

$50,000 I

$50,000 I

$150,000

$50,000 I

$50,000 I

$50,000 I

$150,000

CONG.DIST.

10lRDC

CSR

IV I.

CAPITAL SCHEDULE IN AUGUSTA FOR ELDERLY AND DISABLED Section 5310

= i i 1 : I " $mIQj'#"1\'ff:'fjmmr::I:rtIJII:I1::m;rm:j::'If:IW:i{ffrifr::;:1frf:mJ1'fm:::\I' :f:;:J:r':~Mza~~II:fjJm W:I:;;:1':X~o'U\t$pffJ:m
QRe.SAllNGte&fUQP:jjj:rrrrjfjj:rrrttt:tt:::f:jfffljttt:tm j:f:jittttEI\01\ffir:ffj fl:ififJiM])~tt:t:tjjt

Purchase of Service

$53,308

$53,308

Purchase of Service

$55,973

$55,973

Purchase of Service

$58,772

$58,772

ea<lUillt'ef)$Tirjj:j:ijj:it:ffjtti'i::WjfffffffiWt:iWWWtWjjW:j'tfW,j\t: If\'f'f':':t::\':"'\':::$.$.I~S.Q~i fiffftfflW$.$.$.JI.ZI 'tWjitrjj:jtmff$$I~Z7a '\rjj::ji::rrttjj:$t:d~Q$$

FEDERAL COST

$42,646

$44,778

$47,018

$134,442

STATE COST

$10,662

$11,195

$11,754

$33,611

I..V..
DOT DISTRICT # 2

CONG.DIST.

10 ROC

CSR

~

"
';\

'-Ji;'

CAPITAL SCHEDULE FOR NONURBANIZED AREA TRANSIT (Richmond County) Section 5311

$85,000

$0

i,~,o.-~'f~_":",;,t~",m~1'~ot'Q!~'-~_''~''w1JlL FEDERAL COST STATE COST LOCAL COST

"~f!~~~,$,85~7_O,,b,.o,,lA,j,.,~1."..%,.t!l%f~t&'l:ii;ml~.W_J'L:t_$.,~,_~p'3.,1.,6_,U~O_

$68,0001

$98,800

$8,5001

$12,350

$8,5001

$12,350

DOT DISTRICT # 2

CONGo DIST.

10lADC

CSA

OPERATING ASSISTANCE FOR NONURBANIZED AREA TRANSIT (Richmond County) Section 5311
N UI

(01/01/01 - 12131/01)
(01101/02 - 12131102)
(01/01/03 - 12131/03) 'B.a~~~WJ~C2~71i!i.~ FEDERAL COST LOCAL COST
DOT DISTRICT # 2

$143,900

$143,900

$151,095

$151,095

$175,000

$175,000

If~~~~!~ $71,950
$71,950

~$~~~~~9.9.~ Il.~$:1fZ~;Q AW&$)~~J~.!Jj

$75,548

$87,500

$234,998

$75,5481

$87,5001

$234,998

CONGo DIST.

10lADC

CSR

CAPITAL SCHEDULE FOR NONURBANIZED AREA TRANSIT (Columbia County)

Section 5311

t1J:lf~~.$.QQ~JI.~~ , $JiIR~:J.1lr&.~!.lJ.~a rt.r~~~Q~ .llffilliTIt~~~lIlt~~

~OButTi1et:t,~!lIJ~ .. .."...,.~ ."._",,~i!!. ;;:<_;,,"~.,.;\,~~,,_.,,~ . c..,., ., .. ~_, \I".,. <

. ' .'" - . I1'WI' ,it." .~ ,>"~g"~ ', ~:..{",,O.~~O~;1~..f. .-.,l~5t~jl't:~Ov ~:-ti~:L! rl~.dl&ti.J~:,a~Q'-,2.;'m h~m",t,J~..I".:t1:l: ,~i}',"'..',.m,k0,;L1'4t.~~'I~ii .j"1l.iJ~:'fq

Standard Van with Mobile Radio

$26,500

$26,500

Mini-Bus with Lift and Mobile Radio

$42,500

$42,500

!fai~fll:;~A~~~r.~lIIf~'il ".$.~~~QI${~'il$,t~~~e'QQ ~~ .t.~.i~~:Q ~l.J@;iii[IP.$~~~l~:Q

FEDERAL COST

$21,200

$34,000

$0

$55,200

STATE COST

$2,650

$4,250

$0

$6,900

LOCAL COST

$2,650

$4,250

$0

$6,900

DOT DISTRICT # 2

CONG.OIST.

10 ROC

CSR

N

OPERATING ASSISTANCE FOR NONURBANIZED AREA T~ANSIT (Columbia County)

0\

Section 5311

(01/01/00 - 12/31/00)
(01/01/01 -12/31/01)
(01/01/0212/31/02) r,"et."~8"'t~si~lioSo.-~-~M7t!fri1e.,..~~.~..,si,.g,~~ FEDERAL COST LOCAL COST
DOT DISTRICT # 2

$109,800

$115,300

$121,065

$109,800 $115,300 $121,065

$54,9001 CONG.OIST.

$57,6501

$60,5331

10lROC

$173,083 CSR

'"

,
BRUNSWICK
27

CAPITAL SCHEDULE FORBRUNSWICK MPO Section 5307

::I:ll:I:!:::i=:~i!:!!I:I:!!!!!_ UI:e.se.mBTIHfIMfIIII\111titt':;:I:t:j:::::::\:\:::::j::tt:\:: ::ttt;;reY.o.'::'~'j;'II::~': :j;:::j'ljt::g::D.I:::IIII:
:j::$.r.leUMtrt;\11It:::::Ij:tt:I:;t;:::I\;;r;m'~:II:;':rj:t'j":\:jr'j'II1I: !:':'t'IIp.J.J.J)$:rr:::::: '1I1j'IP.J.J.~:~:'jrrr

Facility Leasing Three 30' Transit" buses Office Equipment Two Vans Capital Maintenance Contingency

$0

$30,000

$30,000

$60,000

$0 $150,000 $150,000 $300,000

$0

$0

$0

$0

$0

$40,000

$40,000

$80,000

$0

$10,000

$10,000

$20,000

$0

$15,000

$15,000

$30,000

::ie8QU:ePltICaSm:tmm:ll1;m;t11::i:tltiltff ::::~:"::~mmmlf':f:~':i:::~'::~i$~[~:: ::::::it::i$~4$~tmU.:f :::iffi::$~4$~.U.1: :::J1:fi$4:$U.~tmU.l:

FEDERAL COST

$0 $196,000 $196,000 $392,000

LOCAL COST

$0

$24,500

$24,500

$49,000

tv, 00

STATE COST

$0

$24,500

$24,500

$49,000

DOT DISTRICT # 5

CONG.DIST.

1 ROC

CG

'.

~)

,
'-.1\)

CAPITAL SCHEDULE IN BRUNSWICK FOR ELDERLY AND DISABLED Section 5310

s~"m.t,e}l~~"'~Jt~~~~\~.~,~'_t~j~;~!Jlw:11~~~k~SJMI~D~~~~#~I~~ILf'lc~l1;mf~&,1,t~~~-t~.W_tJti~jl ~~~\,!ti)r",",1~l..0.~0~A0.1~,1,!>,5.~,~~~~~j~ ;r~~~l~,m-~,O~.O..O,<~,.,,,.~..,,t..1t5.J8;,.!<~m;o~-.%1.J~iH f1ll1~;iret*"ifK,f.if.(t:"l}.O..,Q,,t!!;thi:i,.9~:8ol~il.~:r~+: mm.:~,~,,,,~M.ii~j_;n..~j~B~fif~:t~~EWL_'J~ !~~i>~J~~'!liL!*'~Eft.f.$tl0L2,.t.,1_,i.~4,-1.,t.~~_,j<"j ~h:i1~.~Iffi~;:E;.~M~~,'t~~.:w0.,.3,'~1tW/~ngm~~, ~,~~t!'J;.dl-~~1~"1",..",m.~.m",~~;.~,c',,~R[m~~t,!,~

Purchase of Service

$22,553

$22,553

Purchase of Service

$23,681

$23,681

Purchase of Service

$24,865

$24,865

$4,5111

$4,7361

$4,9731 $14,220

tv \0

DOT DISTRICT # 5

CONG.DIST.

1IRDC

CG

COLUMBUS
/
30

,
-t..)

CAPITAL SCHEDULE FOR COLUMBUS TRANSIT SYSTEM Section 5307

DESt.NF:t:DONiII:':::'::r:::::':::'::::::rtiI=r::r:::::=r:rrr::r::rr:::::r:::,:,rI:::::I,r:"tItttI' II:rr::p(::~r::r:rr $!!P:Wp:?&??:t::::,:::::,,:::,=,::,:,t:r'=':':::::':mmm::::=:'??\i:::::,::::rrr=:=?I:)\\IJ"'\::\\?:N:\ =:?=::)=:~9.~Ir:r

:::I'rriPW$.~=r::r'r: :::::::r'::,,')~P.O:Z)'\:::::=

j:::::i~:::i:;:=::::::::::_

Tire Leasina (Tires, Tubes, Materials)

$74,894

$74,894

$74,894

$224,682

Engine Rebuild Program (21)

$85,600

$85,600

$85,600

$256,800

Transmission Rebuild Proaram (15)

$58,850

. $58,850

$58,850

$176,550

Perventive Maintenance

$310,300

$310,300

$310,300

$930,900

Vehicle Oil Seperator Svstem

$96,300

$0

$0

$96,300

Transit Coaches (17)

$271,817

$581,690

$3,698,716

$4,552,223

Mini Buses (6)

$115,956

$124,072

$132,758

$372,786

Security System

$7,490

$0

$0

$7,490

Fuel System

$9,630

$0

$0

$9,630

Wheel Chair Tie Downs (27)

$2,696

$2,696

$2,696

$8,088

Money Dump System

$26,750

$0

. $0

$26,750

Tire Machine

$6,740

$0

$0

$6,740

TOO Eauipment

$1,605

$0

$0

$1,605

Computer and Accessories (2)

$3,210

$3,210

$0

$6,420

Service Truck

$26,750

$0

$0

$26,750

Construction Addition (Admin Building)

$96,300

$0

$0

$96,300

Bus Stop Signs and Bus Stop Poles

$5,136

$0

$0

$5,136

Change Machine

$2,354

$0

$0

$2,354

Fiber Optics (Wiring and Connections)

$5,350

$0

$0

$5,350

Total Planning Costs

$124,103

$130,307

$130,307

$384,717

:=::::::':::fUtg'Nill} PIlOJ.E:o.T:~$$:::,::,::,:=;:,t:\::\=t,::,:;:?::,:t':=:::'t):;=:=:t:':=,'::::::::\t::tt?::=,::=::=:\tt/\\I }:::ii$.l~~~'~~tf rr::'r$n~Zfi~tJ.: ifrti$M4~a~f'

FEDERAL COST

$1,065,465

$1,097,295

$3,595,297

$5,758,057

STATE COST

$133,183

$137,162

$449,412

$719,757

LOCAL COST

$133,183

$137,162

$449,412

$719,757

DOT DISTRICT# 3

CONG.DIST.

2,3 ROC

LC

:~ I

'.

~~

,.

CAPITAL SCHEDULE FOR COLUMBUS TRANSIT SYSTEM

Section 5309

..~===~~~~-~-

DESCRIPTION

.

Transit Coachess (Six 30 foot)

. 500,000

500,000

500,000

1,500,000

1:::~:PR~qiC't~$'ti:ti::iff:l:m:IItf::::::::k:::fi::i?::i:~~:mm:::~::lt:::::~::?:f:I:;?:::::III~ti:$,'b~~b:::~ ::~::::::f:~ti~~i:::::I:$.QQ~~n.ni:: ~:::r:?~:~:::ff:ti$U.I.;'QU.AI ?fft?ii~~::1.1$.QganW;:=

FEDERAL COST

400,000

400,000

400,000

1,200,000

LOCAL COST

50,000

50,000

50,000

150,000

STATE COST

50,000

50,000

50,000

150,000

DOT DISTRICT # 5

CONG.OIST.

2,3 I ROC

LC

UJ
tv
"

CAPITAL SCHEDULE IN COLUMBUS FOR ELDERLY AND DISABLED Section 5310
t~lt~:~:==- ::::$j;lf?-lif:::::::::H11:::ff::::::ffIfff::::::::::::j:::::::fffI:111::::::::11:ff::f:::::j'I::::::::m:::":::::m::: ::':'::::::::::I::::~V::tf.~~f:f::::' t::::::::,::OOggq~I.':::::::'f:f
j;QE$QSIR;mQN::I:iI::'::i::::r,:::,:,:r:':'i'i::::'l'IIt':':'iI:::i:ini;::,:::::::::::::::r,IIIiJII :IIrn'i'i'i\NQmrrrrmm :::'r:::::::::::::i5':J.~::III:rr::

Purchase of Service

$53,308

$53,308

Purchase of Service

$55,973

$55,973

Purchase of Service

$58,772

$58,772

~

:reSQUimlH;ST.iirr:mr=mrrrr=::ttmrirr:::::l:ir:lr::'trr=IIIII :::::trtriimr=HI~Q'Z$.r r:}:':::::m::::ti::r$.4iial~lt l'IIIIIIIi'$4$.UiSOI :::':::'i:i::;ir':::::i$l:aa~$alr

FEDERAL COST

$35,258

$37,021

$38,872

$111,151

STATE COST

$8,615

$9,255

$9,718

$27,788

VJ VJ
DOT DISTRICT # 3

CONGo DIST.

2,3 RDC

LC

-

<lit

MACON
34

CAPITAL SCHEDULE FOR MACON-BIBB COUNTY TRANSIT AUTHORITY

,

Section 5307

u.g'$Q$O~tti.QNtm::i:t}:::::f:':t'j@fffmt:t'j::'::::t:fmt::t'ji:::tt::ttm:t:ttt :':ttt:':::::~'1\n1:i}::t:?:t: :'fff:t:f:tt::::b:::t':t:t':f :'@f@:':::tEM::Q$'tit':f::m f'f'fttt~t~,r:i::::::f:: Srmefftm@'ifllttt:::::t:::t::::@r:t::t:r:t::t::tm'tmfr::::t:::ttt:'lt::ttttt:t :::'frtt3.ftaln.~::::ttt::: m::,@:::::::auan)!wm::t:t: :::::t:fitQOO1=3.7lttlt

Purchase nine 30 ft transit buses

$690,000

$690,000

$690,000

$2,070,000

Administrative Vehicle

$0

$25,000

$0

$25,000

Paratransit Van

$0

$35,000

$0

$35,000

Paint Transit Authority Office

$0

$35,000

$0

$35,000

Resurface Parking lot

$0

$60,000

$0

$60,000

Upgrade Computer Equipment

$0

$0

$45,000

$45,000

Remodel Transit Office

$15,000

$0

$0

$15,000

:R.amase.m:::eQs.m::::::t:t::t:::t::t:t::::'::W:::::t:::fJfW;:::'::::f:'}:t::tt:::::::::::::::: 'H':'::::':::::':':::]$.lQ$~(wP.f f':"'f':t::::::$141Unn.U:m tt'::'f:::::::':::$.73.$~:PQJn ::f:::::mf::s.a~~s.s~Q(wf

FEDERAL COST

$0

$0

$0

$0

STATE COST

$352,500

$422,500

$367,500

$1,142,500

LOCAL COST

$352,500

$422,500

$367,500

$1,142,500

w

VI

DOT DISTRICT # 3

CONGo DIST.

8 RDC

MG

(;

t.

{~

OPERATING ASSISTANCE SCHEDULE FOR MACON-BIBB COUNTY TRANSIT AUTHORITY
SECTION 5307
~ ::~:$.1lU1:MiI:::):f::::f):):::):fI):::}fl:ff::::f::::f::f::fl:::~:::f::)::::t:::::::::::);~:~:)t~t:}::);:~::):::::::):f):f:::1:::: I~~::;):}}faQ.$.:1lo.~tttt:f ~,):~;)t:I;:)$.Q3"U$::;~~)f"t'):
tQRa.B.511RGtBe.BlQiflHtttIfff11ttI;)tt')IH:)'f):)n):::)m~ ~:Httn)I:)~)~R)iQjt)Ht:)HtIt I:iI1HH6Yi:I.t::iH:::::::)HH:!

(07/01/00 - 06/30/01)

$1,735,717

$1,735,717

(07/01/01- 06/30/02)

$1,770,430

$1,770,430

(07/01/02 - 06/30/03)

$1,805,839 $1,805,839

'HRSQiilJf.C1U1QSln;tImt1tttfff)t::mtn:t')tf)Iig):)I):::1:):):lJ itm:ff$1~~Zal~7':il:r H;Ht:):):)$:1Mll:Q~el( f)t:::):)H:)$1MaQSUISSf :)H):):f):)):$fi~a1~~':~$DH

FEDERAL COST

$812,920

$620,550

$708,551 $2,142,021

LOCAL COST

$922,797 $1,149,880 $1,097.288 $3,169,965

....,
0\

DOT DISTRICT # 3

CONG.DIST.

8 RDC

MG

CAPITAL SCHEDULE FOR MACON-BIBB COUNTY TRANSIT AUTHORITY SECTION 5309
f:~T~ SlUUtt:::fJI:fjtfJI@ffif:I:fffj:j{{:::j:::fj{{{{{@fjtf::::::::::f::j:j{{{{{{{I{ ffff::f3DaI:OG\ff:{{: {{:j:::::::::j3P.$.1:~t::I:::fj{i
Qg~n~JlUItJ.N.:I:t:::t:{::rr{Hn:1:rrlIrrr@mr::rl::::::r::lIr:'::::::r:1::::::::1::: ::::::::tlIlIlIaiQllItmn::::r rlIlj::::::l::::5rrtlPl.::::itt:::::::::

Purchase six 30 ft transit buses

$500,000

$500,000

$500,000

$1,500,000

p=aQu.eP1NIQ$.llNflilIlI::mlIMmfNinlIt'lItilI;;tiIIIII11I1 @m:m{:mr@$.iflQ~QQO{ lnt;::;::::;::;:eO-p;OOlf :;1I{H::j@$$U.f.4~~II

FEDERAL COST

$400,000

$400,000

$400,000

STATE COST

$50,000

$50,000

$50,000

LOCAL COST

$50,000

$50,000

$50,000

:1}$.PQnn~t $1,200,000
$150,000 $150,000

W

"-I

DOT DISTRICT# 3

CONG.DIST.

8 ROC

MG

(~

:

-;~

CAPITAL SCHEDULE IN MACON FOR ELDERLY AND DISABLED Section 5310
==='raW s,ng:!JflIIi:!iii:::iJiiii!}i!Iif!@'!'!i!i:Ii!:t:!i:'i!i!if!"!,!!i'i'{iiIi:':i::'i!i!i!!!i'ii{I!!{i!i/!!i!ii!{!/f/I} :iiI{i:ii)'iaMj,<Ja9ii!i/!i:}{i ::ii:i!{{'mlQ.Qil$~:':i!i!ir::i!:
iPE.SGBIPmmNiE::i'iiiIriiiiir:/!r:i':r'::}/!i::ir::r::i:iiii'ii:!i::ii!i!ii:!'::i::,!::::r:::if}/III/ IIIIrrJPlrU1IINriI::i iEri:'::::}:rFMfl2.:'I:r:!}}:

Purchase of Service

$51,257

$51,257

Purchase of Service

$53,820

$53,820

Purchase of Service

$56,511

$56,511

PRQiJEClhe-asmiW!ttltm!ttWt!ttt'ttit!tN::n:tt!i1t!:giWI :'i:::::!:fWlt:::!tn:$$J.lm lWn{;'l:tNl$.$.a~$.gQ: I!i1::::ilt;':1::;:I::::$$.~h"l1!, :t::ji:fi!i}it:I::$I:$1JSII

FEDERAL COST

$41,006

$43,056

$45,209

$129,270

STATE COST

$10,251

$10,764.

$11,302

$32,318

~

00

DOT DISTRICT # 3

CONGo DIST.

8 RDC

MG

ROME
,...
39

CAPITAL SCHEDULE FOR ROME TRANSIT DEPARTMENT Section 5307

::IIrr:RtlNQa:::III:': :g~8.IRIIQNr::~:::::::~:~::::~~r::~~~:::r:::IIII:i:I::III:m::l:::r::~::::II::::III:~: ~:::::I::IIRY:?A1m:::r]:

':::~ii::':':::::::flg$,:':r':~:~:::'::L::~::IIltQT.'-ip:::r~:~:::

j$.mIMftr{:;;;}:;l{{r{{II::':::{II'~::::::::::~:~:~:::~::I::::::r:IIj;I::~I::{]'::"::::~IIII:': '::Il1tgQQa,,~:':'::;:::::~ ::]:{1tgQQgH::I:~:::: ~:::~:~::JigQQa~~:::]::~

Two Transit Coaches

$220,000

$0

. $0 $220,000

One 16 Passenger Administrative Van

$0

$28,000

$0

$28,000

Computer, Printer, Related Items and

Support Equipment

$0

$5,000

$5,000

$10,000

Copier Office Equipment and Furniture

$0

$5,000

$5,000

$10,000

Maintenance Equipment and Tools

$0

$10,000

$10,000

$20,000

Capital Maintenance Items

$0

$50,000

$50,000 $100,000

:PSQU';PJlRI$.!(i:IIII:"::m::@'rrr:::I:n::I:iiillitfJ:JII:r:~ ::I:;::~:::i$.JIQiQar :::m::n:ii::$~'-iQQA~:~: ::III'::r::$tP~Qaii :::::;::::i::::$.,~1I;9ai':

FEDERAL COST

$176,000

$78,400

$56,000 $310,400

STATE COST

o~

LOCAL COST

$22,000 $22,000

$9,800 $9,800

$7,000 $7,000

$38,800 $38,800

DOT DISTRICT # 6

CONG.DIST.

7 ROC

CV

-:

d> .

~

11

OPERATING ASSISTANCE SCHEDULE FOR ROME TRANSIT DEPARTMENT
Section 5307
: t : B :i:i$.;J;J:B)::tt):ii:i):i)i:i:i:i)ii:):::::):i:ii'i::II1:::::i':::II1I:'il:::i:iti:i:IIiIi:iti:ii!:::::::i:!::::i:'f,i i::::,::::mQAQgl~::::II: i'i:i')'i:i::OOOQOgOl.iitt
::;~BlgE:MI::;BiSJ.g!g:::::m::i::::iilII:i::::::i:::::::i:IIIt::: ::::I:::::i::aiM::;QI':::::::iti:::::: :::::::i::':::i::::firttO~m::ti::t

(01/01/01 - 12/31/01)

$1,247,000

$1,247,000

(01/01/02 - 12/31/02)

$1,310,000

$1,310,000

(01/01/03 - 12/31/03)

$1,376,000 $1,376,000

-.j:>.

:::::IIQIIII:KlQliI:::!IIItilt::::::::::::::::::t:i::::::::::::::ii:'i::n:::i:!':::::: :::llt]gIZ;'PIO::::: :::::I:::1l3~:Q~ggq::: ::::I:iliiI;QQQi:::i I$,:::I~I:UiQIQ:::::

FEDERAL COST

$ 377,040 $ 377,040 $ 377,040 $ 1,131,120

LOCAL COST

$ 869,960 $ 932,960 $ 998,960 $ 2,801,880

DOT DISTRICT # 6

CONGo DIS"

7 ROC

CV

CAPITAL SCHEDULE FOR ROME TRANSIT DEPARTMENT Section 5309

i l = = = - ::::$.1l0Jt~::t::ltI::t::::::I:::mttItlm'IIti::::':::::::m:::::::::::::I::::::::::t:::::m:::m':::m:t:m'l]1.lo:o.o.l.mJ:II':: ':'::::I:::lro:o.gl.~:I:t::
:::::u,$.IBIRnINWItti1mlttttiilttHIIIIII:::t::t:t:tM ::ti:tr'5Y::ilj:i::t:'H':i ::::i::':::rr:5Y:':P.lIIlt::

Six Transit Coaches

$220,000 $220,000 $220,000 $660,000

lR.arl4g~I:~.fi;t::iWmimm::::r':m':trt:irrr;Ii;t;m;t@i;II:I:':$.Il1ilQlt t:::::::t~lIilQl:::: ::::::II:::$gGQ41Q1'::: :::::::,:,::m;$llIil'tt::

FEDERAL COST

$176,000 $176,000 $176,000 $528,000

LOCAL COST

$22,000

$22,000

$22,000

$66,000

STATE COST

$22,000

$22,000

$22,000

$66,000

- DOT DISTRICT # 6

CONGo DIST.

7 RDC

',
CV

.;:.
N

'~

'. '0

,,-
w~

!1.~ . -

CAPITAL SCHEDULE IN ROME FOR ELDERLY AND DISABLED Section 5310

= = - imIRWM:mi!i!iff:!fi'i!Ii!@:!!i!i!i!!i@fiI!i:iIifimW!i!i!i:fi'if'I@:fiI !f::ifi'f~YYQg4.f::@':i: !!i:i:i!:rnQrm1:li@@:!
SIIA1I.N.Qi:'RiSIIUl.!!iIIIIIIIIIII'It::i::r:::r:i: ':::'::::'!'::::::FMmQ,:rrr::I'!i :rr::::::rfJ(:::'Q~::::I:I:r:i:

Purchase of Service

$30,754

$30,754

Purchase of Service

$32,292

$32,292

Purchase of Service

$33,907

$33,907

11(t4UiIlIQ$liWWIIIili::::lIIII'::::::::ni::::::::r:::::tm: ::i:::::::::':::::i::::::::$.I"t{~ :m::::II::::::':::::~~~lg ::::i:::;:::l::::':':':~~~QI II::'::::::;:i:::::~~~~

FEDERAL COST

$24,603

$25,834

$27,126

$77,562

STATE COST

$6,151

$6,458

$6,781

$19,391

DOT DISTRICT # 6

CONGo DIST.

7 RDC

CV

SAVANNAH
"", 44

ACCESS TO JOBS/REVERSE COMMUTE PROGRAM FOR SAVANNAH Section 3037

Program Costs

$1,500,000

$1,500,000

Proaram Costs

$1,500,000

$1,500,000

Program Costs

$1,500,000 $1,500,000

"""":!!s<.tf"i;i!;tfl!;.;.Ii!:Pil1ff.,.lol_.!_"Jj~.5~00.f~
$750,000

.j:>.

$750,000

$750,0001

$750,0001 $2,250,000

VI

DOT DISTRICT # 5

CONGo DIST.

HRDC

CG

~\-

~

s-:

CAPITAL SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY Section 5307

:U.i.$.Q.;BlRl.f.QN.rfiti&ttttir:{::::::::f{::{=:{=:mrMfrWtt::iWr::::::t:t, =:::::i:::::t=ttE:::O~}::::::::m{::: t}tt:::=}=~:Qg::::tffff =t}}::=ii::::ff:Y:=P$.:W:}::::::::=d=;t}}t:\'rOl~W:t:::t:;f:: SOOe:JtIWt:WJ:::::::::::::::::::::::=:::tt::JJ:::::::':t::J:::=::Wi=::W:::t:tm::=:::ttrifIJ::::::::rrr::::::j:r:: t=:=:j:t:::::::$."$.03.3.::::::r::::::::=: :=:::t:rfl.p$.pas,:r::r::r:::: wr::::::::mQQQ~?l1::::t:W:::::::

Capital Maintenance Items

$350,000

$500,000

$500,000

$1,350,000

Facility Modification and Improvement

$100,000

$250,000

$100,000

$450,000

Service/Support Vehicles

$41,000

$20,000

$20,000

$81,000

Passenger Amenities

$0

$0

$0

$0

Maintenance Tools and Equipment

$70,000

$50,000

$50,000

$170,000

:Rtt('l.qg~n:Q(l$l1trrt:::::::::rri:::{::f:JJIJtmrr::=:w::::::::::::::::::j=r::Jtt::::r:::::::::::::::::t:Ml:iJmfr:: :J::::::II:rh:.gq4(J~Q]: ::=:j"=IJJ:=:]$.$.ZQ.l(l~Jtj:: :t:=r:JJD~Q$.I:~(JmJ.J

FEDERAL COST

$448,800

$656,000

$536,000

$1,640,800

STATE COST

$56,100

$82,000

$67,000

$205,100

LOCAL COST

$56,100

$82,000

$67,000

$205,100

...

DOT DISTRICT # 5

0\

CONG.OIST.

1 ROC

CG

OPERATING ASSISTANCE SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY
Section 5307
i:ir~ $T,Iy)#,m::,:):::):@!'@::);:)t:::m:;::::t}::::I:f):):@):)'@f;):::::@)I:):@;::):::fff!'@):::::::::;):iIIlff@ff j:::::):):):)Il$.O$.Oa.I}:)i::::::mm:: ::}:::):fft$.'$.I~:::::t;@:}
Q8SBIJ.1ING:::J1ERIQPrr::::rn:r::::::r::::'::@@@@@@liJ::::::::':::':':':I::r::::r l@fI@llEtUU@@@lUr :::,:,@:n):@feJrO'@@@fI@

(01/01/01 -12/31/01)

$8,272,000

$8,272,000

(01/01/02 - 12/31/02)

$8,437,440

$8,437,440

(01/01/03- 12/31/03)

$8,442,910

$8,442,910

-

RRQUaG.llaalWl:r:1l::::::::1l:':::li::rr::::::':::::::::::::rr::r:ill1:ir:::if'r:'r::::i::l::r ::::'::::mn::1$.J.121IiQQQ; ::11::::r:::::$.~n"$.1Mltll r:1l::::::::::::$1344$.1:1 I:::::::::rl$l$.i1:$~i$$n

FEDERAL COST

$1,403,191

$1,400,000

$1,400,000

$4,203,191

LOCAL COST

$6,868,809

$7,037,440

$7,042,910 $20,949,159

.~
-.I

DOT DISTRICT # 5

CONGo DIST.

1 ROC

CG

~

,. )



c,
.~-



CAPITAL SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY
Section 5309
=l~t==-- Sit1RUtimrff::;;::::t1::1l@':\f:::W%frmr:n:'I::::;:@ft:'Wnf%::::::W:::11:1'1W :1I{::fr$Q,$~~$:::t:\W1\ '11m':gO:$Q,$;~tt:::;::1
'Qi.$.QfURT.tO:N::;::r::::rr::::::::::::r::r:ttIt:rrrr::rrr:r::::::,:,::'::t::::::rr::rmt rrr:'::::t:ftM::Q1::rrlJt: ::t:r::::':::::eY:Q2.':lllr::

Buses, Trolleys, Facilities and Related Equipment Water Ferries & Equipment

$4,000,000 $500,000

$4,000,000 $500,000

$4,000,000 $500,000

$12,000,000 .$1,500,000

:e:mQa.s.c.m:::$.~s.ro::::::::::r::::::;:::l':':::::::::;:::::::::tttttIt:::::;:::::::':Ii::::::::r:::::::::::tmt::r::Itt"~$4.q;~P'::: ::::'::r:::::::$.4~S.UQ~P~P.i::': :::::i::':'::::::::$4'~$.~P,~qJ)P:I ::::rr$j:~~$~~Q~r

FEDERAL COST

$3,600,000

$3,600,000

$3,600,000 $10,800,000

LOCAL COST

$450,000

$450,000

$450,000

$1,350,000

STATE COST

$450,000

$450,000

$450,000

$1,350,000

DOT DISTRICT # 5
~ 00

CONGo DIST.

1 RDC

CG

CAPITAL SCHEDULE IN SAVANNAH FOR ELDERLY AND DISABLED
Section 5310
=~~- ,
:s.rmg::1.fi:::::::::r:mr:m::::::::::::::::::::::::::::::::::::::IIIIIIIIIJIIIIIJIIIIN1J::J:rrrrrm r::::::lt::$.VI.02~::}:::::fr :::::::::::rim~nJQJ.11tm::::::lr :gt;$OaUiltJPN:::mr::::;:::::ti:itJI::::t:i:::IiWr:::!::::Wlmi:@::!i::f:::::::i:i::i::::::::m::t :!:::!:!:::lillfM::P1:::;::::m:::!:!1:::::! :::::::!:!::::!rr::trf.j:J1.g:::::!::ll:J:::::

Purchase of Service

$78,810

$78,810

Purchase of Service

$77,500

$77,500

Purchase of Service

$81,376

$81,376

:e:aUa.:eCitlPQg:!l:::t::::::l:::::::::I!M:j{::'t:::t::WItrr::::g::Jt:m:::::::IIII !:Im:::!:::::Itir:t$.'t.J.~a,~ :::::::!l:::!::::{{:::::!:t$.:tT:~$.Uo.: ::::::::::{::::{{r::J:$s.11J.:t~ :::::::::::::g::::::it$~;tZa~ss

FEDERAL COST

$63,048

. $62,000

$65,101

$190,149

.j:>.

STATE COST

IQ

$15,762

$15,500

$16,275

$47,537

DOT DISTRICT # 5

CONG.DIST.

1 ROC

CG

~

,~

'1



WARNER ROBINS

"
'50

-,~------------------------------------------------------------------------------,

CAPITAL SCHEDULE IN WARNER ROBINS FOR ELDERLY AND DISABLED
Section 5310
I f ' - 3Ite:::lMI:i:K:;::::!:II:;::::;:::::lm::::E!:IKIIE:IIIE;tlliIIE:IiI :::::;::::ttPQI':II.::!:!::::::: !:::::::IIIOQQUf4::::::::I
.fIJ}~~j~fIl~~~~Hf~~~~lt~~]flIIIIIII~~~~III~~~~IIIII~frrrrrr~I]~j tt:::ItEM])1::::::::::::::::r ::::::::::t:UiY41.amm:I

Purchase of Service

$20,503

$20,503

Purchase of Service

$21,528

$21,528

Purchase of Service

$22,604

$22,604

gRQUill1Gf/$.lii.iI1i::'IlI1MmMWii.nMiflM :nifl::ri$.;gl~IQA :::::!:i.i.::i.i.fH:.:~lg~ :::':::::::::::::I::I$.gl~. :IIIIII::.~g$.

FEDERAL COST

$16,402

$17,222

$18,083

$51,708

STATE COST

$4,101

$4,306

$4,521

$12,927 .

-VI

DOT DISTRICT # 3

CONG.DIST.

2 ROC

MG

-.)

x.,

,.

, ~,
',

..

\.11

RURAL PROGRAMS


..,.

52

.

CAPITAL SCHEDULE FOR STATEWIDE NON URBANIZED AREA TRANSIT Section 5311

P'~IfUQ1Ht 19,~~~~l~e.'~~'~N8Mg'~i(t':(~~~~~~it ~$nw't{t :::'~:":tJ;W{ZQQttt'rr {tttJft:tZQQZ,::ttt: 'r":{:rJf.~QI{'rrr :::,:tt?fPIAPt'rrr

1

Gainsville

1C9005

$265,000

1C9006

$123,000

TOOO041

$

84,000

$472,000

2

Tennille

2C9005

$1,097,000

2C9006

$497,000

TOOO042

$ 344,500

$1,938,500

3

Thomaston

3C9005

$537,000

3C9006

$406,000

TOOO043

$ 172,000

$1,115,000

4

Tifton

4C9005

$408,500

4C9006

$112,500

TOOOO44

$ 331,000

$852,000

5

Jesup

5C9005

$528,000

5C9006

$151,000 .

VI

TOOO045

$ 238,000

$917,000

W

6

Cartersville

6C9005

$740,000

6C9006

$396,000

TOOO046

$ 354,000

$1,490,000

7

Atlanta

7C9005

$0

7C9006

$0

N/A

$0

$0

All

Supplemental

8C9005

$300,000

8C9006

$300,000

TOOO048

$ 300,000

$900,000

All

Intercity Bus

8C9103

$1,363,628

8C91 04

$1,465,212

TOOO049

$1,567,729

$4,396,569

~E=~iErej

~

"

t)

..

.

{.J

~-,

OPERATING SCHEDULE FOR STATEWIDE NONURBANIZED AREA TRANSIT Section 5311

DISIRfOIWf DJSIRlOr:NAME'::::;:,::::::::;::::?? s:rmWtt,??: ?::;::;::':F:anl).f)'f:t :ttttRianO-ifit'f fi}':"':Ef.~3.'f:Jtt :ff:'::\J'DIAl.tlt'f:

1

Gainsville

189005

$437,839

189006

$459,822

TOOO050

$482,814

$1,380,475

2

Tennille

289005

$1,039,388

289006

$1,110,394

TOOO051

$1,187,446

$3,337,228

3

Thomaston

389005

$945,290

389006

$990,097

TOOO052

$1,039,677

$2,975,064

4

Tifton

489005

$197,056

489006

$209,404

TOOO053

$226,736

$633,196

5

Jesup

589005

$300,392

589006

$258,711

VI ~

TOOO054

$272,958

$832,061

6

Cartersville

689005

$1,106,800

689006

$1,133,000

TOOO055

$1,113,000

$3,352,800

7

Atlanta

N/A

$0

N/A

$0

N/A

$0

$0

ALL SUPPLEMENTAL

889005

$600,000

889006

$600,000

TOOO057

$600,000

$1,800,000

:raTAlfCOST.S:':r:::::'f:tt::::'::ffffttfnWtt :"':":'::::::':':::$.4i~il:Q': 1:::::ftt:$.4fl~U~2i. ::::t":t':$.4i~IJ.l~1' ::::f::;::~l4i;HP.~~4

FEDERAL COST (50%)

$2,313,383

$2,380,714

$2,461,316

$7,155,412

LOCAL FUNDS (50%)

2,313,383

2,380,714

2,461,316

7,155,412

CAPITAL SCHEDULE FOR ELDERLY AND DISABLED (Statewide) SECTION 5310

,':..,:..... ::'" ,', }~:~:~:~:~:~:~: I:Hf:t!!:t:::::;:::;~:::::::: ::t;:::::::~:n~~ttt ((:tWf~;;;(( :ttt:r.:l~~~::::;(:::: (((::TQ'l:~!;it::tt

1

TOOO061

$147,621

(15 Counties) 1T000062

$155,002

TOOO063

$162,752

$465,375

2

ITOOO064

$106,615

(13 Counties) TOoo065

$111,946

IT000066

$117,543

$336,104

4

TOOO067

$108,665

, (10 Counties) ITOOOO6B

$114,099

11000069

$119,804

$342,568

5

1000070

$75,860

(11 Coumtes) TOOO071

$79,654

.1000072

$83,636

$239,150

6

TOOO073

$51,526

(15 Counties) 000074

$53,820

000075

$56,511

$161,857

7

000076

$45,105

(11 Counties) 000077 000078

. $47,362

. $49,730

$142,197

VI

8

000079

$73,810

VI

(16 Oounites) 000080

$77,501

TOOO081

$81,376

$232,687

9

Too0082

$75,861

(15 Coumtes) .1000083

$79,654

TOOOO84

10

TOOO085

I (14 Counties) TOOO086

.$75,961

$83,958

$83,636

$239,151

1000087

$88,156

$248,075

11

1000088

$26,654

1 (18 Counties) '1000089

$27,986

IToo0090

$29,386

:1>84,026

12

ITOOO091

:1>344,449

(9 Counties) TOoo092

:1>361,671

1Too0093

$379,755

$1,085,875

~:. ::. :,', .:..:.:'::: .:" :,',.,', ::..}~:~:~:~:~:~:~:~:~~:~:~:~:~:~:f~:~:~:~: ::t::{:::!liJi'::...}I;~ :{:;:\:~~,~ ::::tt::::, :" ;.: .....:;....... ::::::~:;:~{:~i~!i;;j_

CCST(80%)

$ 905,702 $ 954,122 $ 1,001,828 1 :I> 2,861,652

ISTATE COST (20%)

$

226,425 $

238,531 $

250,4571:1>

715,413

LOCAL FUNDS (0%)

0

0

01

0

~

.~

,,"

~)

.i

Proposed and Existing

Georgia Passenger Rail System

Operating

Abandoned

_ _ _---..:C::<.!:S.x

__ _

___..N..Qrt91ILS.QJJ~!ll::f!1.

_ _ _~S~h~o~rt!jD.e,,_L

._..._

Amtrak Service

Commuter Rail

First Priority

Second Priority

w..i_W......GJZ*ilLtim.*'_ ~ ~)

Federally Designated High Speed Rail .

First

Priority
Intercity

Second
Rail

Priority

Corridor

Georgia Department of Transportation Office of Interrnodal Programs
Last Updated April 29, 1999

..

..
"

INTERCITY RAIL PASSENGER ROUTES

GREENVILLE

. . . . . - First Priority Routes
Alternative Routings Second Priority Routes

JACKSONVILLE

Georgia Bicycle & Pedestrian Route Map
.:t.

25 Miles

.'

. .Q .. ......

eMacon

Ii ~o~bJ~s~JII "

;0

"

11:



Ief '8W. ~a"rqn.r..

O
I

bi
'i' ,.

n

S

'~ Jll

m~
~.~ ~_._vannah



. (D



I.

. .... "Vaddosta

East-West Routes
10 Southern Crossing 20 Wiregrass 40 TransGeorgia 50 Augusta Link 60 Athens Link 70 Northern Crescent 90 Mountain Crossing

North-South Routes
5 Chattahoochee Trace 15 Central 35 March to the Sea 45 Little White House 55 Appalachian Gateway 85 Savannah River Run 95 Coastal

Governorls Road Improvement Program

aflie,e
t~ '"cRom\e.

.. Columbus /

. FLF

'" .

N
f
No Scale

~ , ~~

~i~Mc..h.e.

Baxley

~ vCI1n,

s ~- \ ..,

. -.:..Alban


I eI!J .

Blakely

.

so. ." Tift.on

," .:~. .~~ "~". D

..

I -..J':JfIII"'" ..~...... -

"" "

,0 \

.9~

Bainbridge c. ... dl'homasvlBe

.-----.;...---!..al!d!os!t!a ~L_.

Status: Open or Constructing
Preconstruction . . .\ Activities

Rural Public Transportation Programs

Existing
0 City Government

CD Cedartown

@ Social Circle

Unadilla

@ Vienna

Americus

,r,

Lagrange

.

URBAN TRANSIT SYSTEMS
6 . -4.-~
.~
orne Transit System

C bb Community Transit

Athens Transi

MARTA Dou las County Rideshare

Augusta Public Tr nsit

If

Macon-Bibb County Transit Authority .

Colu bus Transit System

Albany Transit System

i.,.~
"
I~
-c I L-
C
.-..c-.o..
0.-...
a. en
00 ZO-
:QE) :..E......
..."

..c::

co

~.

c c co c>o

.(-J
e3n:
c

C/)

::J
mL-