v
;
(
.-. \
Georgi Depanment .
of Transponation
o 2001-
2002'
.. 2003
State Transportation
......
l'
....It.. .c.\
:.,.:.... -'':
.,~-:::;.;~~;,-
Improvement Program
State Transportation Improvement Program
Introduction
STIP Public Involvement Process
STIP Funds by Category
STIP Financial Plan - Lump Sum Funding
Understanding STIP Entries
Map of Georgia
Highway, Bridge, and Transit Projects
Index
Appendix
.,~
Glossary
Transit Programs Tables
Proposed Passenger Rail System
Intercity Rail Passenger Routes
Bike/Ped Map
GRIP Map
Rural Transit Map
Urban Transit Systems
Metropolitan Areas
"
..(\
~--
...
State Transportation Improvement Program
Introduction
We are pleased to present the State Transportation Improvement Program (STIP). Projects listed in this document were identified through the planning process and are important to the state's transportation program.
The STIP includes Highway and Bridge, Bicycle, Pedestrian, Transportation Enhancement Activities and Public Transportation (transit) projects. Project related cost, such as Preliminary Engineering (PE), Right of Way (ROW), and Construction are given for highways and Capital and Operating cost for public transit. The projects are organized in alphabetical order by county with the same information categories listed for each of them.
Cost estimates for individual projects are based on the best available engineering estimates.
These costs may change as a project progresses from preliminary engineering to the purchase of
right of way to construction. If these increased costs are the result of a change in the original
scope of the project, the STIP will be amended, after public comments are considered. If the
'.
increased costs are based on updated engineering improvements, and not a change in the actual work, no amendment to the STIP is necessary.
The STIP was developed under guidelines provided by the Transportation Equity Act for the 21st Century (TEA-21), passed by Congress in 1998. TEA-21 continues the initiatives started under the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). Projects in the STIP emphasize the maintenance, safety, and improvement of existing transportation facilities, and public transportation systems.
The STIP is fiscally balanced, including only those projects with funding available or having a reasonable expectation of obtaining funds. Federal funds for fiscal years 2001,2002, and 2003 .are program estimates and will not be final until after the federal budget is implemented on October 1 of each year.
Georgia continues to grow in population at more than double the national average. Georgia's economy is also growing, leading to increased demands on the transportation system. The STIP process insures that we receive maximum benefits from available .funding and that Georgia's transportation system will continue to support and promote Georgia's growth and economy.
The Department of Transportation wishes to thank all of the citizens and local officials for taking the time to provide input on the development of this program.
"'
Georgia Department of Transportation
STATE TRANSPORTATION IMPROVEMENT PROGRAM
PUBLIC INVOLVEMENT PROCESS
Background on the State Transportation Improvement Program
Federal legislation requires that each state produce a State Transportation hnprovement Program (STlP). The STIP lists federally funded projects for the next three years, updated and approved on an annual basis.
A major component of the STIP development process is public- involvement. In the eleven metropolitan areas of the state public involvement is the responsibility of the local metropolitan planning organizations (MPOs) in developing local Transportation hnprovement Programs (TIP). The Office of Planning oversees the STIP public involvement process for the six rural GDOT Districts and distributes the STIP to the Districts for use in their public meetings and meetings with local officials.
Process
The public involvement process has evolved over time but the basic components remain the
same.
'
Public meetings
'.
,
Annual public meetings are held to provide the opportunity for public review and
comment. GDOT contracts with 15 Regional Development Centers (RDC) to
assist with coordinating the STIP public involvement process. In 1997, a
statewide video teleconference was held in seven sites throughout the state. For I
the past three years, DOT District personnel with RDC participation have
conducted the meetings. In 2000 nine public meetings were held on the following
dates:
May 31 June 1 June 6June 7June 7June 8June 15 June 15 June 22 -
Jesup Gainesville Commerce Calhoun Reynolds Thomaston Tifton Hiwassee Tennille
The Department and the RDCs invite large numbers of customers to these meetings. The Department mailed 3,700 individual invitations to local officials and the Family of Partners, a group of stakeholders with interest in transportation.
The RDCs invite local officials, chambers of commerce, transportation providers,
and others. In all, over 5,000 invitations are distributed. Total attendance
statewide at the nine meetings was 380 people.
Ads are placed in local newspapers publicly announcing STIP meetings and
announcements are published in Department newsletters, (OnTarget) and RDC
publications. An informational brochure explaining the STIP process is also
published and distributed at the public meetings.
Meetings with Local Officials
Every year as part of the STIP development process, the District Planning and Programming Engineers meet with representatives from each county and city in their area to discuss projects in the STIP to solicit comments and questions. During these meetings, a range of transportation issues are discussed and requests
a are forwarded to the appropriate DOT office for response. Local officials sign
"Certification of Cooperation with Elected Officials" documenting STIP consultation.
STIP on web
The Department also makes the STIP available to citizens on the Department's . web page. The web address for the Georgia STIP is:
http://www.dot.state.ga.us/homeoffs/planning.www/stip/district.htm
An email contact is also included on this site for citizen's comments.
Comments
Comments received from the public meetings and the meetings with locals are taken into consideration in the development of the STIP and any questions asked are answered or forwarded to the appropriate office. To date, 84 written comments have been received, from the public meetings and the meetings with the local officials. The comments and questions ranged from general questions such as the need for more public transit routes to project specific questions, such as when is a particular project scheduled for construction. All questions were responded to in writing.
The State Transportation Improvement Program is also available in paper format for a fee by calling the Department's Map Sales at (404) 656-5336.
.......
.'
STIP FUNDS BY CATEGORY
Fiscal Year 2001 - 2003
$5.1 Billion
ReconstlRehab - - .
$2,178
Other ----.,.
$157
Safety-$305
Public Transit
$1,042
Maintenance
$236
Bridge
$521
Dollars shown in Millions
"'--- Enhancement
$182
New Construction
$469
Georgia Department of Transportation STIP Financial Plan
The Georgia State Transportation Improvement Program (STIP) lists highway, passenger rail and transit projects. This section describes how: the funding for the STIP was identified for Fiscal 2001-2003. The STu> Financial Plan demonstrates the' source and expenditures of transportation funds to state and local projects. The financial plan includes expenditures for projects matching resources that we can reasonably expect will be available. Only those projects or project phase (preliminary engineering, rights-of way or construction) for highway projects or (capital or operating) for transit projects are included in the STIP.
The 'Fiscal 2001-2003 STIP was developed on the basis of estimated state and federal fund balances and projected 2001, 2002, and 2003 Federal-aid and state funding. TheSTIP document includes a listing of urban and rural transportation projects. The STIP listing incorporates urban projects from the Transportation Improvement Programs adopted by Georgia's urbanized areas and approved by the Governor or his designee. This document is developed for the purpose of providing citizens a comprehensive listing of transportation activities.
The Fiscal 2001-2003 STIP totals $5.09 billion with a FY 2001 annual program of $2.25 billion. Funding for this three-year program includes $3.40 billion in federal funds, $1.48 billion in state funds, and $0.21 billion in local funds. This level of infrastructure investment supports nearly 200,900 jobs in the construction industry as well as a well-maintained transportation system that fosters a healthy economy by providing the infrastructure for efficient movement of goods and people.
The project cost estimates used in developing the STIP are based on the:best available engineering estimates at the time. Final cost for the actual projects may differ, as the'projects are refined in the project development process prior to construction. Modifications that alter the original intent, design, or scope of the project trigger a STIP amendment to incorporate the change.
U&~~f'~*:'.?'~~{~,~.;~f:::~fA ~.'(:~r~~;r~~\~e.~~;?::~~Yj,tx'.1F.f-V:Or:th~:,:?iJ
. ;:;:::-':'.:~.:'''_.~ .".
. . ,...,,: t.:,
,~'. :'. .-.
..::::~:::,':;::, "~::'! .. ',..... : ,,:
Interstate Maintenance (1M) - Funds used for resurfacing, restoration,' and rehabilitation of the Interstate Highway System. These funds cannot be used to provide new capacity to the system, nor for construction of new facilities such as rest areas, ports of entry, etc. '
National Highway System (NHS) - The system of national highways approved by Congress and considered most important to interstate travel, national defense, connectivity with other modes of transportation, and for international commerce. The system includes the current Interstate highways and other key state routes identified by the State.
.
Surface Transportation Program (STP) - STP funds may be used for a range of projects from new construction to resurfacing, and may be flexed to transit. STP funds are distributed according to
f...: - ....
~ .. federal guidelines and in compliance with State legislation.
Lf
Fifty percent of STP funds are for urban and rural areas of the state based on population. Thirty percent can be used in any area of the state at the direction of the State Transportation Board. Of the remaining twenty percent, ten percent is for highway safety projects and ten percent is used for' Transportation Enhancement Activity projects. Safety projects include Hazard Elimination, Railroad Crossing, and Railroad Protective Devices.
The Transportation Enhancement Program is very popular, especially with 'users of non-traditional transportation. The State Transportation Board established the Transportation Enhancements Advisory Panel to assist in project selection and to represent statewide interests with expertise in . multi-modal facilities, historic resources, transportation aesthetics, scenic preservation and other' TEA-type activities.
There are twelve categories of TEA projects. These include It provisions offacilities for pedestrians and bicycles; provision of safety and educational activities for pedestrians and bicyclists; acquisition ofscenic easements...or historic sites; scenic or historic highway programs (including the provision of tourist and welcome center facilities), landscaping and other scenic beautification; historic preservation, rehabilitation and operation ofhistoric transportation buildings, structures, or facilities (including railroad facilities); preservation ofabandoned railway corridors (including the conversion and use thereoffor pedestrian or bicycle trails); control and removal ofoutdoor advertising; archaeological planning and research; and environmental mitigation to address water pollution due to highway runoff, or reduce vehicle-caused wildlife mortality (while maintaining habitat connectivity); and, establishment of transportation museums. It Source: National Transportation Enhancement Clearinghouse.
Legislation limits eligible recipients to public agencies. However, private groups are encouraged to participate by applying through an appropriate public agency (County and/or City). TEA program funds require a 20% match provided by the recipient.
Congestion Management/Air Quality (CMAQ) - These funds are for projects, which can be proven to reduce traffic congestion and/or improve air quality in non-attainment areas. Projects such as park and ride lots, signal coordination, and ride sharing qualify for these funds. Currently, there are thirteen counties in the non-attainment area: Cherokee, Clayton, Cobb, Coweta, DeKalh, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Paulding, and Rockdale.
Bridge Replacement (DR) - These funds are for the replacement orrehabilitation of substandard bridges both on and off the federal system. Bridges must have a span of 20 feet and must be listed on the Federal Register with a sufficiency. rating of 80 or less for rehabilitation and 50 or less for replacement.
Demonstration or High Priority (Demo, HPP) - These funds are Congressionally authorized and designated for specified projects.
State Funding Sources - State funds are available from several sources including motor fuel taxes,
special fuel taxes (diesel) and 3% state sales tax on gasoline. Eighty-five percent of these funds are
-;;. used for construction and maintenance of highways. The remaining fifteen percent are programmed
I:.
~.~,,::.
(or improvements to local roads. Revenues from these sources increase about one percent a year. State funds are part of the STIP program development and are used for federal match.
2
Federal Highway Funding Sources - Federal funds in the STIP are estimated based on the
expectations of what Congress will authorize to be spent on the program. The Department expects a
total of $3.61. billion in federal funds over the next three years, from the Highway Trust Fund and
from carryover funding from the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 and from Transportation Equity Act for the 21st Century (TEA-21). Georgia's yearly share from the
Highway Trust Fund is anticipated to be about 3.48% of the estimated $29.2 billion Congress is
expected to approve. The obligation ceiling, or the minimum amount of funds that Georgia will
receive, is 92% of that amount. Estimates are subject to change based on forthcoming yearly
appropriation and obligation levels set by Congress.
I
Local Highway Funding Sources - During the three-year program local funds will be needed to match federal-aid for local highway projects and for local contributions to matching improvements on the state highway system.
The federal-aid program for FY 2001-2003 includes funds for improvements to the state highway system, for the local roads, transit and other projects. The following table summarizes program funding for FY 2001-2003:
FY 2001-2003 Estimated Cost of Highway Projects ($ Millions)
.... '
Fund Source
FY 2001
Federal Aid State Funds Local Funds Total
Program Distribution State Highway Local Roads and Streets Transfer to Transit Transit Related Highway Funded Other Total
$1,165 $646 $50
$1,861
$1,346 $242 $41 $137 $95
$1,861
Total
,
FY 2001-2003 ,
$2,695 $1,276
$77 $4,0,48
i
$2,924 $501 $84 $361 $178
$4,048 1
Average Annual FY 2001-2003
$898 $425
$26 $1,349
$975 $167
$28 $120 $59 $1,349
;-;'
LJ'
I Note that the amount offunds Programmedfor projects is $4,048 million. Amount offunds from all sources is $5.09,billion. The transportation
program isjinancially constrained.
'
3
Local Road Assistance
Federal-aid to local governments is primarily from the Surface Transportation Program and the Bridge Replacement and Rehab" ilitation Prog. ra,m' : . Loca] . .' '\, ,g' overnplen't. s r" ec" eive' ,fed".e' ,.ral fu' nIds for
specific projects arid Congestion Mitigation!Air: Quality funds based on project eligibility and
selection, Enhancement projects are selected, statewide based on the guidance provided through the
Georgia Transportation Enhancement Program. '
,
\
(, ".
:';,. .
~.y
4
Federal Aid Highway Estimated Obligation Authority FY 2001
($ Millions)
Category
Federal Funds
Interstate Maintenance Bridge Placement & Rehabilitation
National Highway System Congestion Mitigation Surface Transportation Program Misc. Categories Total Apportionment
$330 $216
$255 $49
$506 $216 $1,572
Required Matching Funds Total
I
:
$33 $365
I
$43 $259
$47 $302
$9 $58
$94 $600
$40 $256
$266 $1,840
Obligation Ceiling Minimum Guarantee Appalachian High Priority Projects Misc. Projects
Total Federal Funding Availability
$710 $215
$43 $179
$10
$1,157
I
i
$130 $840
$40 $255
,
$8 $51
$36 $215
$2 $12
$216 $1,373
Federal Aid Highway Estimated Total Apportionment FY 20012003
($ Millions)
Category (FY) Federal Aid Match Local Total
2001 $2018 $297 $58 $2,373
2002 $1,210
$189 $35
$1,434
2003
Total
,
$1,220
$4,448
$191
$677
$35
$128
$1,446
$5,253
Transportation Equity Act for the 21st Century - Title 3 programs
Transit, passenger rail, aviation, freight rail and ports join highways as significant modes in
Georgia's intermodal transportation system. Non-highway modes funded through Title ill or
through moneys flexed from Title 1 are part of the STIP. Because of its importance to the state's
transportation program, a comprehensive summary of non-highway modal programs, funded with
other than TEA 21 funding and administered by the Georgia Department of Transportation is
included in this document.
'
tJ.. ~:.-. ~
5
The Georgia Department of Transportation in cooperation with the Federal Transit Administration (FTA) and the state's public transit agencies work together to develop service programs and facility improvements to meet the state's public transportation needs.
One of the missions .of GDOT's public transit program is to preserve and enhance the state's facilities and equipment in urban and rural public transit. Public transit projects listed in the STIP are funded with Federal Transit Administration funds (under TEA 21). These projects have been identified by the MPOs through the transportation planning process and become a part of the Transportation Improvement programs (TIP) in urban areas.' The Department in cooperation with rural transit operators identifies rural needs. Urban transit projects are listed for cities with transit programs in operation - Albany, Athens, Atlanta, Augusta, Columbus, Macon, Rome and Savannah.
Urban transit projects include capital, planning, and operating (Federal Transit - Section 5307) and statewide elderly/disabled capital (Federal Transit - Section 5310) projects. GDOT is the designated recipient of FTA funds for areas under 200,000 population. The Department receives financing from' the General Fund budget to match one half of the local share of transit projects in Albany, Athens, Macon, Rome and Savannah. In addition, the Department coordinates with the Georgia Department of Human Resources (GDHR) on elderly and handicapped transportation projects.
Atlanta, Augusta and Columbus have populations of over 200,000 and receive transit funds directly. The Department also provides one half the local share of matching funds for capital projects in these areas. In the past few years, the Department has played an important role in providing financial assistance to match projects for Cobb Community Transit (CCT), the new Gwinnett County Transit, and the Metropolitan Atlanta Regional Transit Authority (MARTA).
Transit Programs include:
"
FTA Section 5307 Program - provides funding for capital, planning and operation
assistance. Funds are distributed nationwide on a formula basis.
FTA Section 5309 Program - offers capital funding for public transportation systems on a
discretionary basis.
'
FTA Section 5310 Program - provides funding to private non-profit agencies for capital improvements to be used in the provision of transportation service to elderly and disabled persons.
FTA Section 5311 Program - provides funding to enhance the access of people in nonurbanized areas to healthcare, shopping, education, employment, public services and recreation. Funds are available for capital equipment, operating and administrative expenses.
IJ
State Funding Sources - The State Legislature provides one-half of the required twenty percent
match for federal transit funding through the General Fund. Approximately $12 million in General
. (~','' ',. Funds for transit purposes are programmed in the STIP.
..
6
Federal Transit Funding Sources - The federal-aid funds estimates are partially based on estimates of federal revenue available to Georgia through the Transit Trust Fund and from earmarked funds in the Transportation Efficiency Act for the 21st Century (TEA-21).
Local Transit Funding Sources - During the three-year program, an estimated $130 million in ,local funds will be needed to match federal-aid. These funds are acquired through local sales taxes, special taxing districts, property taxes as well as the general tax digest.
FY 20012003 Source of Funds: Transit Projects ($ Thousands)
Fund Source Federal Funds State Funds Local Funds Total
FY 2001
$155,592 $4,891 $45,822
$206,305
Total FY 20012003 . $427;Q64 $12,145 $130,523 $569,732
Annual Averaae $142,355 $4,048 $43,508 $189,911
Estimated Costs: Transit Projects FY 2001 ($ Thousands)
Category .
Section 5311 0 Section 5307 0 Section 5310 Section 5311 C Section 5309 Cl Section 5309 C4 Section 5307 C 1 Section 5307 C4 G93 Total Apportionment
Federal Funds
$2,270 $4,372 $1,662 $4,192 $30,936 $57,660 $18,711 $35,639
$150 $155,592
Required State Matching Funds
$0 $0 $417 $526 $1,717 $0 $2,231 $0 $0 $4,891
Required Local
Matching
Total
Funds
$2,270 $4,540
$12,657 .$17,029
$2 ' $2,081
$526 $5,244
$4,517 $37,170
$14,415 '$72,075
$2,375 '$23,317
$8,910 $44,549
$150 $300
$45,822 $206,305
Estimated Federal Appropriations for Transit FY 2001. 2003 ($ Thousands)
Category (FY) Federal Funds State Funds Local Funds Total
r>. <-
~j
2001 $155,592 $4,891 $45,822 $206,305
2002 $136,899 $3,887 $42,707 $183,493
2003 $134,573 $3,367 $41,994 $179,934
Total $427,064 $12,145 $130,523 $569,732
7
The mission ofGDOT's aviation program is to'preserve and enhance the State's air transportation system to meet the demands of users. The program provides financial and technical support to publicly owned, open to the public airports. The GeorgiaDepartment of Transportation is authorized to plan and support the establishment, development and maintenance of aviation and aviation facilities. The Georgia Airport Aid Program (GAAP) provides state funding assistance, appropriated by the Georgia General Assembly, for capital, maintenance, approach aid and planning , projects. Development, Maintenance, Approach Aid, and Planning projects are funded at 75% state assistance or 50% state assistance for urban area airports lacking federal support. All FAA (Federal Aviation Administration) supported construction projects may be funded at 90% FAA and 5.5% state aid. Airport markings on State development projects are eligible for 100% funding. In addition, the minimum contract level of state funding assistance on all GAAP projects is $1,500. State projects (non-federal) are selected annually based on the GAAp Priority System criteria. Federally funded projects have the highest priority for matching state funds.
The mission of GDOT's rail program is to preserve and enhance the State's rail transportation. system for future development of freight and passenger rail service. Existing rail corridors identified in the "Freight Rail Plan" are acquired and rehabilitated to assure strategic rail freight access to Georgia communities. GDOT has acquired 281 miles of rail lines in Georgia since 1992. Three hundred and one miles of rail lines in the State have been rehabilitated since 1981. The passenger rail program, defined in the "Intermodal Program for Rail Passenger Service in Georgia," guides implementation of both intra-state, intercity and commuter rail service to provide a multi-modal alternative in the State's largest travel markets. The seven commuter services and the six intercity lines will serve the Atlanta, Athens, Gainesville, Bremen, Canton, Senoia, Griffin, Macon, Albany, Savannah, Augusta and Columbus markets.
The mission of GDOT's ports program is to preserve and enhance waterway transportation. In order to maintain a navigable channel, the Corps of Engineers dredges the Savannah River annually. The Department's role is to provide and maintain dredge material containment areas for the Corp's work on the Savannah Harbor and the Atlantic Intracoastal Waterway. The Department is required to fund dike design, construction, maintenance, environment mitigation and operations. GDOT annually requests funding from the Georgia General Assembly to cover the costs of these activities. There are no matching federal or local funds for these programs.
State Transportation Improvement Program (STIP) and
Transportation Improvement Program (TIP) Amendment Process
If
The STIPfTIP amendment process described below details procedures that are to be used to update an existing approved STIP or TIP. A key element of the amendment process is to assure that funding balances are maintained.
8
TIP (Transportation Improvement Program) Administrative Changes The following actions are eligible as Administrative Changes to the TIP: Obvious minor data entry errors. Splitting or combining projects. Minor change in expenditures for transit projects Changes or clarifying elements of a project description (with no change in funding). This would
generally be less than 10% change in project termini. This change would not alter the original project intent. Increase funding less than 20% for a Lump sum category
The Administrative Change process consists of a letter of notification from the MPO (Metropolitan
Planning Organization) to all other involved parties: GOOT, FfA and FHWA. No public
involvement process is required for Administrative Changes.
'
TIP (Transportation Improvement Program) Minor Amendments (not controversial)*
A Minor Amendment to the TIP would include adding or deleting one of the following project types:
Bike/pedestrian projects
TEA projects
Transit enhancements
Transportation studies using capital funds (also needs to be in S~R Work Program)
Turn lane, intersection improvements and signal projects
.,
Signage, lighting, landscaping or green way projects
Recreational Trails projects
~
Minor ITS/ATMS projects
*A controversial project is defined on a case by case basis through the MPO planning process. Consideration will be given to the amount of money involved, scope, geographic location and impacts in evaluating if a project maybe controversial.
A Minor Amendment to the TIP would include making any of the following changes: Shifting projects within the TIP Move PE, ROW or Construction Funds programmed for previous year into a new TIP Shifting Construction funds to add a PE or ROW phase to a project The deletion of a project at the request of the Project Sponsor . Increase funding more than 20% for a Lump sum category (maintenance, safety, PE, hazard elimination, RIR crossing etc.)
The Minor Amendment process for areas with over 500,000 population requires advertising of the amendment in a legal organ, allowing a IS-day comment period and responding to any comments received. Following public notice, approval action may be taken through the usual TCC, TAQC and ARC Board process.
'\
For areas with less than 500,000 in population, the amendment is placed on the agenda for discussion at the CAC, TCC and PC meetings and any comments receive responses.
The MPO is responsible for giving notification to GDOT and FHWA/FfA of the action taken and providing assurance that the minor amendment process and the public involvement process were
9
followed.
TIP (Transportation Improvement Program) Major Amendments
Major Amendments to the TIP would include the following.
Change in scope that alters the original intent of the project
Increase or decrease in the scope of a project by more than 10%.
Add/Delete project not identified in the minor amendment section: i.e. capacity increases,
regionally significant projects, major ATMS projects, and controversial projects of any
type.
'
The Major Amendment process for areas with greater than 500,000 in population requires
widespread advertisement, a 30 day public comment period, and response to all comments received,
either via individual or summary form. There is no requirement for a public hearing; however, the
MPO may choose to hold a hearing. The Major Amendment project is put on the agenda for
discussion and action at TCC, TAQC and the ARC Board.
'
The Major Amendment process for areas with less than "500,000 in population requires public advertisement, a IS-day comment period, and response to all comments, either individually or in a summary form. There is no requirement for a public hearing. The Major Amendment follows the usual CAC, TCC and PC process for action.
The MPO is responsible for notification to aDOT and FHWAIFTA of action taken and assuring that
the
\
Major
Amendment
process
and
public
involvement
procedures
have
been
.
followed..
STIP (Statewide Transportation Improvement Program) Administrative Changes The following actions are eligible as Administrative Changes to the STIP:
Project number change or Project identification number change. Splitting or combining projects. Increase in Lump Sums by less than 20%. Fund source change. Obvious minor data entry errors. Minor change in expenditures for transit projects Changes or clarifying elements of a project description (with no change in funding). This
would generally be less than 10% change in-project termini. This change would not alter the original project intent.
The STIP Administrative Change process consists of notification to all involved parties in'the latest version of the Department's Construction Work Program. No public involvement process is required in such instances. If an administrative change is made at the time of submittal of a project for authorization, that form will serve as such notice.
STIP (State Transportation Improvement Program) Minor Amendments
A Minor Amendment to the STIP would include the following.
Shifting projects within the STIP.
Move PE, ROW or Construction Funds programmed to another year of the STIP
The deletion of a project at the request of the Project Sponsor.
f.:......
~
.
Increase in Lump Sums project amounts by more than 20%.
L,,:,Y
Shifting Construction funds to add a PE or ROW phase to a project
Addition or deletion of projects shown on the TIP Minor Amendment list
10
Increase funding more than 20% for a Lump sum category (maintenance, safety, PE, hazard elimination, RJR crossing etc.)
':
Written notification is submitted to the FHWA showing the change made and stating the source of
funding assuring that the financial balance of the STIP is maintained. Cost changes made to the
second and third years of the STIP will be balanced during the STIP yearly update process. Minor
and Major amendments to the STIP are denoted as addenda and consecutively numbered.
STIP (State Transportation Improvement Program) Major Amendments Major amendments to the STIP would include the following:
Addition of an annual TIP. Addition or deletion of projects on the TIP Major list. Major change to scope of work of an existing project. A major change would be any
change that alters' the original project intent i.e. a change in the number of through lanes, a change in termini of more than 10 percent, or a change in location.
The Department places the public advertisement, with a 15-day comment period, and responds to all comments, either individually or in summary form. For a STIP amendment that is solely inclusion of an approved TIP or approved amended TIP, a further public involvement process is not required because the MPO conducts a process prior to State approval.
An amendment will be submitted to FHWA requesting approval of the addition or change made and stating the source of funding to maintain a balanced STIP. Cost changes; made to the second and third year of the STIP will be balanced during the STIP yearly update process. The Department assures that the Major Amendment process and the public involvement procedure was followed.
Notes: 1) An amendment to the STIP or TIP is not necessary for adding individual projects from Lump sum categories as long as they are consistent with the category definitions. . 2) The date at which a TIP becomes effective is when the Governor or his designee approves it.
3) The date at which a STIP becomes effective is when FHWA and FTA approve it.
4) The STIP is developed on the state fiscal year, which begins July 1. 5) For cost increases> 50% for a project with the STIP cost under $1,000,000 andfor cost increases> 20% or $1 million (whichever is greater) for projects costing over $1,000,000 will be handled as a minor amendment. Notification will be sent to the project sponsor and the MPO as appropriate when a project is shifted within the STIP as a result of these amendments.
STIP Financial Plan Final
j
t< ''\
lY
11
LUMP SUM FUNDING
A portion of the STIP funding is set aside for five groups of projects that do not affect the capacity of the roadway. Funds are set up in lump sum categories to undertake projects that are developed after ,the STIP is approved. These lump sums are listed in a number of funding types for each year for the Department's convenience in managing the funding. Funds are drawn from theselump sums during the year and individual projects are programmed. The individual projects may include work at one or several locations for letting and accounting purposes. Listed below are these five groups and information about them. The total available fundsare shown as construction but preliminary engineering and rights-of-way may be drawn from this amount when needed.
Group: maintenance
Criteria: maintenance. only
This group has six funding/work types: two are for bridge painting/maintenance and the other four are for roadway maintenance. Major types of work .undertaken are: resurfacing, pavement rehabilitation, median work, impact attentuators, signing, fencing, pavement markings, landscaping, rest areas, walls, guardrail' and shoulder work. Also included is .. preliminary engineering necessary' to prepare plans and rights-of-way needed for things like landslide repair, sewer hookups and erosion control.
Group: safety
Criteria: work qualifying for the High Hazard Safety Program
This group has four funding/work types: signal installation/upgrades, guardrail installation, sign installation, railroad protection devices, railroad crossing hazard elimination, roadway hazard elimination and special safety studies and programs.
Group: preliminary engineering
Criteria: planning, management systeins and consultant design services
This group has two funding/work types: planning/management systems and consultant design. services
Group: wetland mitigation
Criteria: site restoration for projects already under construction/complete and wetland banks
This group is a single item.
Group: roadway/interchange lighting
(
Criteria: lighting
~..~.~ .:. ..:
.:.':
...
This group is a single item.
Understandihg STIP Entries
Typical project
This is the PI or Project Identification number used throughout the life of the project for tracking purposes.
Preliminary Engineering Year that funding became available for this phase.
DRAFT STATE TRANSPORTATION IMPROVEMENT PROGRAM
Friday, March 12,2000 Page 20 of 221
Type of work, replacement of an existing bridge. See Glossary of Terms for further definitions. _
Funding type: third item on top line. May be Bridge, STP, NHS, etc. & refers to specific type of federal funds to be used.
Project description: State route 90 at Little House Creek approximately 1.7 miles south of Fitzgerald. Passing lane projects may only indicate milepost numbers.
..
.;
..
Federal share of construction. Georgia share of construction.
Construction. The DOT is scheduled to let to construction after 2002.
Right of Way to be purchased after 2002.
If dollar amount is shown, that is the
federal funding; if LOCL is shown, right
of way to be purchased by local
.
government.
\I
BICYCLE AND PEDESTRIAN ENHANCEMENTS :
;
HIGHWAYS AND BRIDGES MAINTENANCE SAFETY TRANSIT
....
I I
.
f: :.-
~hJ;
County
Appling
Atkinson
Bacon
Baker
Baldwin
Banks
Barrow
Bartow
Ben Hill
Berrien
Bibb
Bleckley
Brantley
Brooks
Bryan
Bulloch
Burke
Butts
Calhoun
Camden
Candler
Carroll
.
Catoosa
Charlton
Chatham
a-
Chattahoochee
Chattooga
Cherokee
Clarke
Clay
Clayton
Clinch
Cobb
Coffee
Colquitt
Columbia
Cook
Coweta
Crawford
Crisp
Dade
Dawson
Decatur
Dekalb
Dodge
t :. s~;..
~:;:/
Dooly Dougherty
Page 25 26 27 28 29 31 32 34 37 38 39 47 48 49 50 51 52 53 55 56 58 59 61 63
64 70 71 72 77 81 82 87 88 95 97 99 102 103 106 107 .
108 109 110 111 118 119 120
County
Douglas
Early
Echols
Effingham
Elbert
Emanuel
Evans
Fannin
Fayette
Floyd
Forsyth
Franklin
Fulton
Gilmer
Glascock
Glynn
Gordon
Grady
Greene
Gwinnett
Habersham
Hall
Hancock
Haralson
Harris
Hart
Heard
Henry
Houston
Jackson
Jasper
Jeff Davis
Jefferson
Jenkins
'\ ,
Johnson
Jones
Lamar ,
Lanier
Laurens
Lee
Liberty
Lincoln
Long
Lowndes
Lumpkin
Macon
Madison
Page
123 127 128 129 131 132 134 135 136 139 143 145 146 183 184 185 188 190 191 193 199 201 204 205 207 209 210 211 215 218 220 221 222 224 225 226 227 228 229 232 233 235 236 237 239 240 241
, County
Marion
McDuffie
.' McIntosh
Meriwether
. Miller
Mitchell
Monroe
Montgomery
Morgan
Murray
Muscogee
Newton
Oconee
Oglethorpe
Paulding
. Peach
Pickens
Pierce
Pike
Polk
Pulaski
Putnam
Quitman
Rabun
Randolph
Richmond
Rockdale
Schley
Screven
Seminole
.Spalding
Stephens
Stewart
Sumter
Talbot
Taliaferro
Tattnall
Taylor
Telfair
Terrell
Thomas
Tift
Toombs
Towns
Treutlen
f'~,.
Troup
6~~
Turner
Page
242 243 244 245 247 248 249 251 252 253 254 259 262 263 264 265 267 268 269 270 272 '273 275 276 277 278 282 285 286 287 ,288
, ,. 291 292 293 295 296 297 298
~299
301 302 303 305 307 308 309 311
County Twiggs Union Upson Walker Walton Ware Warren Washington Wayne Webster Wheeler White . Whitfield Wilcox Wilkes Wilkinson Worth
Page
313 314 315 317 318 320 322 323 325 .327 328 329 330 332 333 334 336
..
,~
,f
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
ALL COUNTY
PROJECT: 0000064 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: INTERSTATE WILDFLOWER PROGRAM
FUND: STP
0/0.00
PE: 200 I ROW: LOCL CST: 2001 . FED Share: GA Share:
$40,000
$460,000 $368,000
$92,000
PROJECT: 0000065 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: INTERSTATE GATEWAY LANDSCAPING FY 2000
FUND:STP
0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share: GA Share:
$1,250,000 $1,000,000
$250,000
PROJECT: 0000066 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: INTERSTATE GATEWAY LANDSCAPING FY 2001
FUND: STP
0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share: GA Share:
$1,250,000 $1,000,000
$250,000
PROJECT: 0000295 TYPE WORK: SIGNING
FUND: STP
PE: 2001
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: APPALACHIAN FOOTHILLS PARKWAY-FABRICATE & INSTALL LOGO SIGNS
CST: 2001
FED Share:
GA Share:
$50,000
$300,000 $240,000
$60,000
PROJECT: 0000348 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STATE LENGTH (miles / km) 0/0.00
DESCRPT: TASK ORDER CT-CONSULTANT ENGINEERING & INSPECTION GRIP $FYOI
PE:NONE ROW: NONE CST: 2001
GA Share:
$3,000,000 $3,000,000
PROJECT: 0000349 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STATE LENGTH (miles / km) 0 /0.00
DESCRPT: TASK ORDER CT-CONSULTANT ENGINEERING & INSPECTION GRIP $FY02
PE:NONE ROW: NONE CST: 2002
GA Share:
$3,000,000 $3,000,000
PROJECT: 0000350 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STATE LENGTH (miles / km) 0/0.00
DESCRPT: TASK ORDER CT-CONSULTANT ENGINEERING & INSPECTION GRIP $FY03
PE.'NONE ROW: NONE CST: 2003
GA Share:
$3,000,000 $3,000,000
f- "
l,
PROJECT: 0000372 TYPE WORK: ATMS/ITS
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: ATMS: VARIABLE MESSAGE SIGNS AT WEIGH STATIONS NEAR ATLANTA
PE: 2000 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$1,500,000 $1,350,000
$150,000
Page J of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
ALL COUNTY
PROJECT: 0000395 TYPE WORK: ,SPECIAL STUDIES
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: VALUE E1'!GINEERING STUDIES FOR NHS PROJECTS COSTING OVER 25 M
PE: 2001 ROW: NONE CST: NONE
$2,400,000
PROJECT: 000q694 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) 0/0.00
DESCRPT: OPERATE STATE AGENCY WIDE COMMERCIAL VEHICLE PERMIT SYSTEM
PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:
$3;000,000 $2,400,000
$600,000
PROJECT: 0000782 TYPE WORK: PRELIMINARY ENGINEERING
FUND: STATE
LENGTH(miles / km) 0/0.00
DESCRPT: SUBSURF~CE. UTILITY ENGINEERING CONSULTANT SERVICES - GRIP,
PE: 2001 ROW: NONE CST: NONE
$1,000,000
PROJECT: 0000806 TYPE WORK: PRELIMINARY ENGINEERING
FUND: MIN. GUARAN PE: 2000
UNDERWAY
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: SOIL SURVEYS; BRIDGE FOUND.; HAZARD STUDIES BY CONSULTANT
CST: NONE
LUMP SUM PROJECT
.
PROJECT: 0000839 TYPE WORK: ATMS/ITS
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: ATMS/ INSTALL ITS COMPONENTS OF COASTAL GA EVACUATION PLAN
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$4,627,000 $3,701,600
$925,400
PROJECT: 0000840 TYPE WORK: PRELIMINARY ENGINEERING
FUND: BRIDGE
LENGTH (miles / km) 0/0.00
DESCRPT: DESIGN OF 40 BRIDGES OUTSIDE THE ATLANTA MPO-CT 4 - PE ONLY,
PE: 2001' ROW: NONE CST: NONE
$9,999,000
PROJECT: 0000841 TYPE WORK: PRELIMINARY,ENGINEERING
FUND: BRIDGE
LENGTH (miles / km) 0/0.00
DESCRPT: DESIGN OF 40 BRIDGES OUTSIDE THE ATLANTA MPO-CT 5 - PE ONLY
" PE: 2002 ROW: NONE CST: NONE
$9,999,000
PROJECT: 0000863 TYPE WORK: SIGNALS
FUND:,sTP
LENGTH (miles / km) , 0/0.00
r' '.~
DESCRPT: CONSULTANT SERV FOR TRAFFIC SIGNAL DESIGN STATEWIDE/PH 4~PE LUMP SUM PROJECT
~2:~;:j:'
PE:2000 ROW: NONE .CST: NONE
UNDERWAY
Page 2 0/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
,----------_._*. 9/21/00
_-""-_..-.;-~-."'..."
ALL COUNTY
PROJECT: 0001015 TYPE WORK: PRELIMINARY ENGINEERING
FUND: STATE
LENGTH (miles / km) 0/0.00
DESCRPT: ENVIRONMENTAL ANALYSIS ON GRIP PROJECTS BY CONSULTANT
LUMP SUM PROJECT
PE: 2000 ROW: NONE CST: NONE
UNDERWAY
PROJECT: 0001016 TYPE WORK: PRELIMINARY ENGINEERING
FUND: STATE
LENGTH (miles / km) 0/0.00
DESCRPT: ENVIRONMENTAL ANALYSIS ON STATE-AID PROJECTS BY CONSULTANT
LUMP SUM PROJECT
PE:2000 ROW: NONE CST: NONE
UNDERWAY
PROJECT: 0001135 TYPE WORK: SIGNALS LENGTH (miles / km)
DESCRPT: UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN DIST 3 LUMP SUM PROJECT
FUND:STP 0/0.00
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$500,000 $400,000 $100,000
PROJECT: 04MOOI- TYPE WORK: RESURFACE & MAINTENANCE
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM FOR INTERSTATE MAINTENANCE FOR FY 2001
PE: 2001 ROW: NONE CST: 2001 FED Share: GA Share:
$200,000
$6,557,000 $5,901,300
$655,700
:;
'~~" -
PROJECT: 04M002- TYPE WORK: RESURFACE & MAINTENANCE
FUND: 1M
PE: 2002
$200,000
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: LUMP SUM FOR INTERSTATE MAINTENANCE FOR FY 2002
CST: 2002
$20,000,000
FED Share:
$18,000,000
GA Share:
$2,000,000
PROJECT: 04M003- TYPE WORK: RESURFACE & MAINTENANCE
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM FOR INTERSTATE MAINTENANCE FOR FY 2003
PE: 2003 ROW: NONE CST: 2003 FED Share: GA Share:
$200,000
$20,000,000 $18,000,000
$2,000,000
PROJECT: 04MBOl- TYPE WORK: BRIDGES
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2001
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$7,000,000 $6,300,000
$700,000
_...
. . . .. C!:~. ':'~
}.-
~J~'
PROJECT: 04MB02- TYPE WORK: BRIDGES
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 200i
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$5,000,000 $4,500,000
$500,000
Page 3 0/336
_ _ _'""n
STATE TRANSPORTATIO. N IMPROVEM. ENT PROGRAM
.. " _ .
9/21/00
.,.--.._. ,._.
~.....
ALL COUNTY
PROJECT: 04MB03- TYPE WORK: BRIDGES
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2003 .
PE:N0.NE ROW: NONE CST: 2003 FED Share: GA Share:
.. "'_ _
$2,000,000 $1,800,000
$200,000
PROJECT: 171540- TYPE WORK: BRIDGE PAINTING
FUND: STP .
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: BRIDGE PAINT IN CLARKE-FRANKLIN-JACKSON-STEPHENS-WALTONIY540
CST: 2001
LUMP SUM PROJECT
FED Share: .
ASSOCIATED PROJECTS: 17Y540-
GA Share:
$303,000 $242,400
$60,600
PROJECT: 17Y540- TYPE WORK: BRIDGE PAINTING
FUND: 1M
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: BRIDGE PAINT IN CLARKE-FRANKLN-JACKSON-STEPHNS-WALTONII 7 I 540 .:
CST: 2001
LUMP SUM PROJECT
FED Share: .
ASSOCIATED PROJECTS: 171540-
GA Share:
$104,000 $93,600 $10,400
PROJECT: IB9005- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
LENGTH (miles / km)
0/0.00
ROW: NONE
DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 16 COUNTIES/CITIES IN NE GA.
CST: 2001
FED Share:
OTHShare:
PROJECT: IB9006- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 16 COUNTIES/CITIES IN NE GA
CST: 2002
FED Share:
OTHShare:
PROJECT: I C9005- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: VEHICLES- RADIOS- BASE STATIONS- COMPUTERS- ETC.
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTH Share:
PROJECT: IC90067 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTHShare:
lj:(i.':
PROJECT: 271175- TYP~ WORK: BRIDGE PAINTING
FUND: STP
PE: NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: "BR"PAINT IN BALDWNIBLCKLY/GREN/HANCKlJASPRIMORGINEWTN/RCHMD CST: 2001
LUMP SUM PROJECT
FED Share:
ASSOCIATED PROJECTS: 27Y175-
GA Share:
$438,000 $219,000
~
$219,000
"
$460,000. $230,000
$230,000
$239,000 $212,000
$27,000 $27,000
$11 1,000 $99,000 $12,000 $12,000 I
$185,000 $148,000 . $37,000
Page 4 0/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _ _ _ _ _ _ _O
9/21/00
Jidi_._ _~,_ $I
.~.
_
ALL COUNTY
PROJECT: 27Y175- TYPE WORK: BRIDGE PAINTING
FUND: 1M
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: "BR"PAINT IN BALDWN/BLCKLYIGRENIHANCKlJASPRIMORGINEWTNIRCHMD CST: 200 I
LUMP SUM PROJECT
FED Share:
ASSOCIATED PROJECTS: 271175-
GA Share:
$50,000 $45,000
$5,000
PROJECT: 2B9005- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 0 /0.00
ROW: NONE
DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 22 COUNTIES/CITIES IN E. GA.
CST: 2001
FED Share:
$1,040,000 $520,000
OTH Share:
PROJECT: 2B9006- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
. LENGTH (miles / km) 0 /0.00
ROW: NONE
DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 22 COUNTIES/CITIES IN E. GA
CST: 2002
FED Share:
$520,000
$1,110,000 $555,000
OTHShare:
$555,000
PROJECT: 2C9005- TYPE WORK: CAPITAL
FUND: TRANSIT
PE: NONE
LENGTH (miles / km) 0 10.00
ROW: NONE
DESCRPT: VEHICLES RADIOS- BASE STATIONS- COMPUTERS- ETC.
CST: 2001
$988,000
FED Share:
$878,000
GA Share:
$110,000
<i:
~'.
OTH Share:
$110,000
PROJECT: 2C9006- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTH Share:
$448,000 $398,000
$50,000 $50,000
PROJECT: 312180- TYPE WORK: BRIDGE PAINTING
FUND: 1M
LENGTH (miles/km) 0/0.00
DESCRPT: BRIDGE PAINTING IN BIBB-HOUSTON-MACON-PEACH COUNTIES/3IYI80
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 31Y180-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$270,000 $243,000
$27,000
.
f'
t:;~~
PROJECT: 312185- TYPE WORK: BRIDGE PAINTING
FUND: 1M
LENGTH (miles / km) 0 10.00
DESCRPT: BRIDGE PAINTING IN HENRY-PEACH-TALBOT-TROUP COUNTlES131YI85
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 31Y185-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
PROJECT: 315001- TYPE WORK: RESURFACE & MAINTENANCE
FUND:NHS
LENGTH (mileslkm) 010.00
DESCRPT: LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 2001
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$403,000 $362,700
$40,300
$17,360,000 $13,888,000
$3,472,000
PageS 0/336
----- ---- - - - - -
---_._-_._-----
STATE TRANSPORTATION IMPROVEME.NT PROGRAM
9121100
_ _ _ _ _ _...
10 lll:
. , _ , . _ ,.. ,
.._*"'- ..
..
,,~. ~ ""~
ALL COUNTY
PROJECT: 315002- TYPE WORK: RESURFACE & MAINTENANCE
FUND: NHS
LENGTH (miles I km) 0/0.00
DESCRPT: LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 2002
PE:NONE ROW: NONE CST: 2002 FED Shure: GA Shure:'
$37,500,000 $30,000,000 $7,500,000
PROJECT: 315003- TYPE WORK: RESURFACE & MAINTENANCE
FUND: NHS
." LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 2003
PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:
$37,500,000 $30,000,000
$7,500,000
PROJECT: 315UOI- TYPE WORK: LIGHTING
FUND:NHS
. LENGTH (miles / km) 0 10.00
DESCRPT: LUMP SUM INTERCHANGE/ROADWA Y LIGHTING FOR FY 2001
PE:NONE , ROW: NONE
CST:200i FED Shure:
GA Share:
$1,000,000 $800,000 $200,000
PROJECT: 315U02- TYPE WORK: LIGHTING
FUND:NHS
LENGTH (miles r km) 0/0.00 .
DESCRPT: LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 2002
PE:NONE . ROW: NONE
CST: 2002 FED Share:
GA Share:
. $] ,000,000 . $800,000 $200,000
PROJECT: 3 I5U03- TYPE WORK: LIGHTING
FUND: NHS
LENGTH (miles I km) 0 10.00
DESCRPT: LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 2003
PE."NONE ROW: NONE CST: 2003 FED Share: GA Share:
$1,000,000 $800,000 $200,000
PROJECT: 31Y I80- TYPE WORK: BRIDGE PAINTING
FUND: STP
.
LENGTH (miles I km)
0/0:00 .
DESCRPT: BRIDGE PAINTING IN BIBB-HOUSTON-MACON-PEACH COUNTlES/312180
LUMPSUM PROJECT
ASS'OCIATED PROJECTS: 312180-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$35,000 $28,000
$7,000
PROJECT: 31YI85- TYPE WORK: BRIDGE PAINTING
FUND: STP
LENGTH (miles I km) 0 10.00
DESCRPT: BRIDGE PAINTING IN HENRY-PEACH-TALBOT-TROUP COUNTlES/3 12185
'LUMP SUM PROJECT
ASSOCIATED PROJECTS: 312185-
PE:NONE ROW: NONE CST: 200] FED Share: GA Share:
$272,000 $217,600
$54,400
PROJECT: 33AOOI- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
PE:NONE
I
LENGTH (miles I km) . 0 10.00
ROW: NONE
DESCRPT: LUMP SUM ALL SAFETY FUNDS FOR FY 200 I
CST: 2001
$5,000,000
FED Share:
$4,500,000
GA Share:
$500,000
Page 6 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _ _ _ _ _ _ _ _ _ _ _ _Ol. ...
_ 9/21/00
ALL COUNTY
PROJECT: 33A002- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: LUMP SUM ALL SAFETY FUNDS FOR FY 2002
FUND: STP 0/0.00
PE: NONE ROW: NONE CST: 2002 FED'Share: GA Share:
$2,294,000 $2,064,600
$229,400
PROJECT: 33A003- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles/km)
DESCRPT: LUMP SUM ALL SAFETY FUNDS FOR FY 2003
FUND: STP 0/0.00
PE: NONE ROW: NONE CST: 2003 FED Share: GA Share:
$2,500,000 $2,250,000
$250,000
PROJECT: 33COOI- TYPE WORK: RESURFACE & MAINTENANCE
FUND: STP
.LENGTH (miles / km) 0 /0.00
DESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA GT 200K FY 2001
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$5,636,000 $4,508,800 $1,127,200
PROJECT: 33C002- TYPE WORK: RESURFACE & MAINTENANCE
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA GT 200K FY 2002
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$7,500,000 $6,000,000 $1,500,000
PROJECT: 33C003- TYPE WORK: RESURFACE & MAINTENANCE
FUND: STP
LENGTH (miles / km) 0/0.00
IJESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA GT 200K FY 2003
PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:
$7,500,000 $6,000,000 $1,500,000
PROJECT: 33DOOI- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA FY 200 I
FUND:STP 0/0.00
PE:2001 ROW: NONE CST: 2001 FED Share: GA Share:
$700,000
$2,740,000 $2,192,000
$548,000
PROJECT: 330002- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA FY 2002
FUND:STP 0/0.00
PE:2002 ROW: NONE CST: 2002 FED Share: GA Share:
$700,000
$30,000,000 $24,000,000
$6,000,000
,
f" ~L;~;:
PROJECT: 33D003- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM MAINTENANCE FOR ANY AREA FY 2003
FUND:STP 0/0.00
PE: 2003 ROW: NONE CST: 2003 FED Share: GA Share:
$700,000
$40,000,000 $32,000,000
$8,000,000
Page 70/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_
... , . " . . . . . . - _ - _ .
_ _ ....
~
9/21/00
._.D Z I ;... ~
,_ _. _ .
.._ . . . .
""..,""_~
.. ,..
ALL COUNTY
PROJECT: 33DBOI- TYPE WORK: BRIDGES
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR FY 2001
PE:NONE ROW: NONE CST: 2001 FED Share: GAShare:
$16,000,000 $12,800,000
$3,200,000
PROJECT: 33DB02- TYPE WORK: BRIDGES
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR FY 2002
PE:NONE ROW: NONE CST: 2002' FED Share: GA Share:
$5,000,000 $4,000,000 $1,000,000
PROJECT: 33DB03- TYPE WORK: BRIDGES
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP ~UM BRIDGE MAINTENANCEIPAINTING J:OR FY 2003
PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:
$5,000,000 $4,000,000 $1,000,000
PROJECT: 33DMOI-. TYPE WORK: SPECIAL STUDIES
FUND: STP
LENGTH (miles / km) . 0/0.00
DESCRPT: LUMP SUM T~NSPORTATION PLANNING & MANAGEMENT SYST~MS
PE: 2001 1l0W:NONE CST:NONE .
$1,840,000
:!
PROJECT: 33DM02- TYPE WORK: SPECIAL STUDIES
FUND:STP
LENGTH.(miles/km) 0/0.00
DESCRPT: LUMP .SU,M TRANSPORTATION PLANNING & MANAGEMENT SYSTEMS
PE: 2002
$2,000,000
~
ROW: NONE
. CST: NONE
PROJECT: 33DM03- TYPE WORK: SPECIAL STUDIES
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM TRANSPORTATION PLANNING & MANAGEMENT SYSTEMS
PE: 2003 ROW: NONE CST: NONE
$2,000,000
PROJECT: 33DWOI- TYPE WORK: WATER POLLUTION MITIG.FUND:'$TP
.
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP S~M WETLAND MITIGATION SITE PURCHASE/RESTORATION 2001
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$5,041,000 $4,032,800 $1,008,200
PROJECT: 33DW02- TYPE WORK: WATER POLLUTION MITIG.
FUND: STP .'
PE:NONE
,
LENGTH (miles /km) 0/0.00
ROW: NONE
DESCRPT: LUMP SUM WETLAND MITIGATION SITE PURCHASE/RESTORATION -2002
CST: 2002
$2,000,000
f" '~,
lit
FED Share: GA Share:
$1,600,000 $400,000
Page8oj336
,
...,
'.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
n.
... .... ..
gl_"_~"""'
_"'"~
9/21/00
9"""'_~~:_"'
~~_.,_""
0' ",.,- _
ALL COUNTY
PROJECT: 33DW03- TYPE WORK: WATER POLLUTION MITIG.
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM WETLAND MITIGATION SITE PURCHASE/RESTORATION -2003
PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:
$2,000,000 $1,600,000
$400,000
PROJECT: 33MSOI- TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: LUMP SUM R.RX PROTECTION DEVICE FOR FY 200\
FUND:STP 0/0.00
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$5,976,000 $5,378,400
$597,600
PROJECT: 33MS02- TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: LUMP SUM R.RX PROTECTION DEVICE FOR FY 2002
FUND:STP 0/0.00
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$2,600,000 $2,340,000
$260,000
PROJECT: 33MS03- TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: LUMP SUM R.RX PROTECTION DEVICE FOR FY 2003
FUND:STP 0/0.00
PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:
$2,600,000 $2,340,000
$260,000
PROJECT: .33NSOI- TYPE WORK: RR XING
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM RAILROAD CROSSING HAZARD ELlMINA TION FY 200 I
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$6,811,000 $6,129,900
$681,100
PROJECT: 33NS02- TYPE WORK: RR XING
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: LUMP SUM RAILROAD CROSSING HAZARD ELlMINA TION FY 2002
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share: .
$2,600,000 $2,340,000
$260,000
,
rr ';
~c ~;:
PROJECT: 33NSOJ- TYPE WORK: RR XING
FUND: STP
LENGTH (miles/km) 0/0.00
DESCRPT: LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION FY 2003
PROJECT: 371720- TYPE WORK: BRIDGE PAINTING
FUND: STP
LENGTH (miles/km) 0/0.00
DESCRPT: BRIDGE PAINTING IN MUSCOGEE-SUMTER-TALBOT-TAYLOR COUNTIES
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 37Y720-
PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:
PE:NONE ROW: NONE CST: 2001 FEDSlJare: GA Share:
$2,600,000 $2,340,000
$260,000
$210,000 $168,000
$42,000
Page 90[336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
.. -------~------_ .._----- 9/21/00 ------"'------=------
ALL COUNTY
PROJECT: 37Y720- TYPE WORK: BRIDGE PAINTING
LENGTH (miles i km)
FUND: 1M 0/0.00
DESCRPT: BRIDGE PAINTING IN MUSCOGEE-SUMTER-TALBOT- TAYLOR COUNTIES
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 371720-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$70,000 $63,000 $7,000
PROJECT: 3B9005- TYPE WORK: OPERATING
FUJVD: TRANSIT
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: RURAL ~UBLIC TRANSIT SERVICE IN 17 COUNTIES/CITIES IN MID.GA
CST: 2001
FED Share:
OTH Share:
PROJECT: 3B9006- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 17 COUNTIES/CITIES IN MID GA
CST: 2002
FED Share:
OTH Share:
PROJECT: 3C9005- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: MODIFIED VAN; MINIBUS WITH LIFT
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTHShare:
PROJECT: 3C9006- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTHShare:
PROJECT: 410715- TYPE WORK: BRIDGE PAINTING
FUND: 1M
LENGTH {miles/ km) 0/0.00
DESCRPT: BRIDGE PA~TING IN COFFEE-COO~-ECHOLS-TIFT COUNTIES/41 Y7 I5
LUMPSUM PROJECT
ASSOCIATED PROJE~TS: 41Y715-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
. $856,000 $428,000 $428,000 $990,000 $495,000 $495,000
$649,000 $584,100
$64,900
PROJECT: 41Y715- TYPE WORK: BRIDGE PAINTING
FUND: STP
. LENGTH (miles / km) 0/0.00
DESCRPT: BRIDGE PAINTING IN COFFEE-COOK-ECHOLS-TIFT COUNTIES/410715
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 410715-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
PROJECT: 471410-. TYPE WORK: BRIDGE PAINTING
FUND: STP
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: BRIDGE PAINTING IN CRISP-DECATUR-DOUGHERTY COUNTIES/47Y410
CST: 2001
c;
LUMP SUM PROJECT
FED Share:
L;;~~~ ASSOCIATED PROJECTS: 47Y410-
GA Share:
Page 10 0[336
------------_._--,._ __ STATE TRANSPORTATION IMPROVEMENT PROGRAM' 9/21/00
....... --------------~-------
.. .
ALL COUNTY
PROJECT: 47Y410 TYPE WORK: BRIDGE PAINTING
FUND: 1M
LENGTH (miles I km} 0 10.00
DESCRPT: BRIDGE PAINTING IN CRISPDECATUR-DOUGHERTY COUNTIES/471410
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 471410-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$219,000 $197,100
$21,900
PROJECT: 4B9005- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
LENGTH (miles I km) 010.00
ROW: NONE
DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 7 COUNTIES/CITIES IN S.W. GA
CST: 2001
FED Share:
OTH Shure:
PROJECT: 4B9006- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
LENGTH (miles I km) 0 10.00
ROW: NONE
DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 7 COUNTIES/CITIES IN S.W. GA
CST: 2002
FED Shure:
OTH Share:
PROJECT: 4C9005- TYPE WORK: CAPITAL LENGTH (miles I km)
DESCRPT: VEHICLES- RADIOS- BASE STATIONS COMPUTERS- ETC.
FUND: TRANSIT
PE: NONE
010.00
ROW.' NONE
CST: 2001
FED Share:
GA Shure:
OTH Share:
PROJECT: 4C9006- TYPE WORK: CAPITAL LENGTH (miles I km)
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC.
FUND: TRANSIT
PE: NONE
010.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTH Shure:
PROJECT: 511395- TYPE WORK: BRIDGE PAINTING
FUND: 1M
LENGTH (miles I km) 0 10.00
DESCRPT: BRIDGE PAINTING IN APPLING-CHARLTON-CHA THAM-GLYNN CO/51 Y395
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 51Y395-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$198,000 $99,000 $99,000
$210,000 $105,000 $105,000
$368,000 $327,000
$41,000 $41,000
$102,000 $91,000 $11,000 $11,000
$180,000 $162,000
$18,000
,
__:;f~
~l
PROJECT: 51Y395 TYPE WORK: BRIDGE PAINTING
FUND: STP
LENGTH (miles I km) 0 10.00
DESCRPT: BRIDGE PAINTING IN APPLING-CHARLTON-CHATHAM-GLYNN CO/51 1395
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 511395-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
PROJECT: 5B9005- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
LENGTH (miles I km) 0 10.00
ROW: NONE
DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 5 COUNTIES IN S.E. GA.
CST: 2001
FED Share:
OTH Share:
$101,000 $80,800 $20,200
$300,000 $150,000 $150,000
Page JJ of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
-...""------ ,,------_._--- 9/21/00 . ,----~_ ..._.------"""""-~--...._""-----_._-------
ALL COUNTY
PROJECT: 5B9006- TYPE WORK: OPERATING
FUND: TRANSIT
PE: NONE
.0
LENGTH (miles / km) 0/0.00
ROW.; NONE
DESCRPT: RURAL PUBLIC TRANSIT IN 5 COUNTIES/CITIES IN S.E. GA
CST: 2002
$260,000
FED Share:
$130,000
OTHShare:
PROJECT.~ 5C9005- TYPE WORK: CAPllAL LENGTH (miles / km)
DESCRPT: VEHICLES- RADIOS- BASE STATIONS- COMPUTERS- ETC.
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTHShare:
PROJECT: 5C9006- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC.
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTH Share:
PROJECT: 611285-, TYPE WORK: BRIDGE PAINTING
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT:, BRIDGE PAINTING IN BARTOW-CHEROKEE-GORDON COUNTIES/6IY285
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 61 Y285-
PE:NONE ROW.; NONE
CST: 2001 FED Share:
GA Share:
$130,000
$475,000 $422,000
$53,000 $53,000
$136,000 $121,000
$15,000 .$15,000
$815,000 $733,500 $81,500
PROJECT: 61Y285- TYPE WORK: BRIDGE PAINTING
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: BRIDGE PAINTING IN BARTOW-CHEROKEE-GORDON COUNTIES/611285
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 611285-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$163,000 $130,400
$32,600
PROJECT: 671190- TYPE WORK: BRIDGE PAINTING LENGTH (miles / km)
FUND: STP
0 /0.00
.'
PE:NONE ROW: NONE
DESCRPT: BRIDGE PAINT IN CATOOSA-DADE-FANNIN-MURRAY COUNTIES/67Y 190
CST: 2001
LUMP SUM PROJECT
FED Share:
ASSOCIATED PROJECTS: 67Y190-
GA Share:
$233,000 $186,400 $46,600
PROJECT: 671195- TYPE WORK: BRIDGE PAINTING
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: BRIDGE PAINT IN CARROLL-FLOYD-PAULDING-POLK COUNTIES/67YI95
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 67Y195
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$354,000 $283,200 $70,800
PROJECT: 67Y190 TYPE WORK: BRIDGE PAINTING
FUND: 1M
PE:NONE
,
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: BRIDGE PAINT IN CATOOSA-DADE-FANNIN-MURRAY COUNTIES/671 190
CST: 2001
$143,000
LUMP SUM PROJECT
FED Share:
$128,700 .
ASSOCIATED PROJECTS': 671190-
GA Share:
$14,300
Page 12 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _ _ _ _ _ _ _ _ _ _ _ _ _
9/21/00
" - - _.... _ _..... _
IS<
.,.._
,----~-------
ALL COUNTY
PROJECT: 67Y195- TYPE WORK: BRIDGE PAINTING
FUND: 1M
LENGTH (miles I km) 0 10.00 DESCRPT: BRIDGE PAINT IN CARROLL-FLOYD-PAULDING~POLK COUNTIES/67 I 195
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 671195-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$318,000 $286,200
$31,800
PROJECT: 6B9005- TYPE WORK: OPERATING
FUND: TRANSIT
PE.'NONE
LENGTH (miles I km) 0/0.00
ROW: NONE
DESCRPT: RURAL PUBLIC TRANSIT SERVICE IN 15 COUNTIES/CITITES IN NW GA
CST: 2001
FED Share:
$1,108,000 $554,000
OTH Share:
PROJECT: 6B9006- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
LENGTH (miles I km) 0/0.00
ROW: NONE
DESCRPT: RURAL PUBLIC TRANSIT IN 15 COUNTIES/CITIES IN N.W. GA
CST: 2002
FED Share:
$554,000
$1,134,000 $567,000
OTHShare:
$567,000
PROJECT: 6C9005- TYPE WORK: CAPITAL LENGTH (miles I km)
DESCRPT: VEHICLES-RADIOS-BASE STATIONS-CPMPUTERS-ETC.
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTHShare:
'-.
PROJECT: 6C9006- TYPE WORK: CAPI,TAL
FUND: TRANSIT
PE: NONE
LENGTH (miles I km) 0/0.00
ROW: NONE
DESCRPT: VEHICLES; RADIOS; BASE STATIONS; COMPUTERS; ETC.
CST: 2002
FED Share:
GA Share:
OTHShare:
$666,000 $592,000
$74,000 $74,000
$357,000 $3 I 7,000
$40,000 $40,000
PROJECT: 821055- TYPE WORK: BRIDGE REHAB
FUND: STP
LENGTH (mites I km) 0/0.00
DESCRPT: OFF SYSTEM PILE ENCASEMENT PROJECT TO REPAIR 4 BRIDGES
PE: 1996 ROW: NONE CST: 2003 FED Share: GA Share:
UNDERWAY
$50,000 $40,000 $10,000
PROJECT: 82 I 070- TYPE WORK: ATMS/ITS LENGTH (miles I km)
DESCRPT: ATMS/ ROADWAY WEATHER INFORMATION SYSTEM
FUND: NHS 0/0.00
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$4,597,000 $3,677,600
$919,400
to "",-:
~i~:
PROJECT: 860110- TYPE WORK: PRELIMINARY ENGINEERING
FUND: HPP
LENGTH (miles I km) 0 10.00
DESCRPT: TRANSPORTATION ALTERNATE STUDY-ATLANTA TO CHATTANOOGA(RURAL) PROPOSED TCM
ASSOCIATED PROJECTS: 86Y110-
PE: 2001 ROW: NONE eST: NONE
$3,875,000
Page J3 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
ALL COUNTY
PROJECT: 870152- . TYPE WORK: PRELIMINARY ENGINEERING
FUND: BRIDGE
LENGTH (miles / km) 0/0.00 DESCRPT: STATEWIDE BRIDGE INVENTORY & INSPECTION FOR 2001 - PE ONLY
PE: 2001 ROW: NONE CST: NONE
$3,800,000
PROJECT: 870153- TYPE WORK: PRELIMINARY ENGINEERING
FUND: BRIDGE
LENGTH (miles / km) 0/0.00
DESCRPT: STATEWIDE BRIDGE INVENTORY & INSPECTION FOR 2002 - PE ONLY
PE: 2002 ROW: NONE CST: NONE
$3,000,000
PROJECT: 870154- TYPE WORK: PRELIMINARY ENGINEERING
FUND: BRIDGE.
LENGTH (miles / km) 0/0.00
DESCRPT: STATEWIDE BRIDGE INVENTORY & INSPECTION' FOR 2003 - PE ONLY
PE: 2003 ROW: NONE CST: NONE
$3,000,000
PROJECT: 870165- TYPE WORK: PRELIMINARY ENGINEERING LENGTH (miles / km)
DESCRPT: TRAINING FOR TEA PROJECTS - 3 YEAR CONTRACT
FUND:STP 0/0.00
PE: 2001 ROW: NONE CST: NONE
$75,000
PROJECT: 870315- TYPE WORK: SIGNING
FUND: STP
,
LENGTH (miles / km) 0/0.00
DESCRPT: SIGNING OF BICYCLE AND PEDESTRIAN ROUTES STATEWIDE
LUMP SUM PROJECT
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$500,000 $450,000 $50,000
PROJECT: 870345 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) 0/0.00
DESCRPT: SIGNAL SOFTWARE PROCUREMENT LUMPSUM PROJECT
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$500,000 $450,000
$50,000 .
PROJECT: 870351- TYPE WORK: SIGNING
FUND: STP
PE: 1999
.
LENGTH (miles/km) 0/0.00
ROW: NONE
DESCRPT: NON-INTERSTATE LIMITED ACCESS HIGHWA Y SIGN UPGRADE STATEWIDE
CST: 2001
.
FED Share:
UNDERWAY
$4,000,000 $4,000,000
PROJECT: 870422- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP
PE:NONE
...
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT - PHASE 2
CST: 2001
$9,000,000
FED Share:
$7,200,000
GA Share:
'$1,800,000
Page l4 of336
STATE TRANSPORTAl,/ON IMPROVEMENT PROGRAM
9/21/00
ALL COUNTY
PROJECT: 870424- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles I km) 0/0.00
DESCRPT: TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT - PHASE 3
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$9,000,000 $7,200,000 $1,800,000
PROJECT: 870426- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: TASK ORDER CONTRACT-CONSULTANT ENGINEERING & INSPECTION PH 4
CST: 2003
FED Share:
GA Share:
$9,000,000 $7,200,000 $1,800,000
PROJECT: 8B9005- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 010.00
ROW: NONE
DESCRPT: DISCRETIONARY OPERATING FOR RURAL PUBLIC TRANSPORTATION PROG
.CST: 200 I
FED Share:
OTH Share:
PROJECT: 8B9006- TYPE WORK: OPERATING
FUND: TRANSIT
PE: NONE
LENGTH (miles I km) 0/0.00
ROW: NONE
DESCRPT: DISCRETIONARY OPERATING FOR RURAL 'PUBLIC TRANSPORTATION PROG
CST: 2002
FED Share:
OTHShare:
PROJECT: 8C9005- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
LENGTH (mileslkm) 0/0.00
ROW: NONE
DESCRPT: DISCRETIONARY CAPITAL FOR RURAL PUBLIC TRANSPORTATION PROG.
CST: 2001
FED Share:
GA Share:
OTHShare:
PROJECT: 8C9006- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
LENGTH (miles I km) 0 10.00
ROW: NONE
DESCRPT: DISCRETIONARY CAPITAL FOR RURAL PUBLIC TRANSPORTATON PROG.
CST: 2002
FED Share:
GA Share:
OTHShare:
PROJECT: 8C9103- TYPE WORK: CAPITAL LENGTH (miles I km)
DESCRPT: PURCHASE OF INTERCITY BUS COACHES
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTH Share:
;.
l.~
PROJECT: 8C9 I04- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: PURCHASE INTERCITY BUS COACHES
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTHShare:
$600,000 $300,000 $300,000
$600,000 $300,000 $300,000
$270,000 $240,000
$30,000 $30,000
$270,000 $240,000
$30,000 $30,000
$1,228,000 $1,091,000
$137,000 $137,000
$1,319,000 $1,172,000
$147,000 $147,000
Page 15 of336
STATE TRANSPORTATION IMPROVEMENT PROGRA.M
d. ..._= .9/21/00
IIII
... _ _ ~
..............."'''' _ _ .. ,
ALL COUNTY
PROJECT: DNROOI~ TYPE WORK: BICYCLE/PED. FACILITY
FUND: REC TRAILS PE: NONE
.
LENGTH (miles r km), 010.00
ROW: NONE
DESCRPT: LUMP SUM DNR RECREATIONAL TRAILS PROGRAM FOR FY 2001
CST: 2001
$950,000
FED Share:
$750,000
OTH Share:
PROJECT: DNR002- TYPE WORK: BICYCLE/PED. FACILITY
FUND: REC TRAILS PE:NONE
LENGTH (miles I km) 010.00
ROW: NONE
DESCRPT: LUMP SUM DNR RECREATIONAL TRAILS PROGRAM FOR FY 2002
CST: 2002
FED Share:
$200,000
$1,250,000 $1,000,000
OTH Share:
PROJECT: DNR003 TYPE WORK: BICYCLE/PED. FACILITY
FUND: REC TRAILS PE: NONE
LENGTH (mileslkm) 0/0:00
ROW: NONE
DESCRPT: LUMP SUM DNR RECREATIONAL TRAILS PROGRAM FOR FY 2003
CST: 2003
FED Share:
$250,000
$.1,250,000 $1,000,000
PROJECT: MOOOOOI TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles I km) 010.00
DESCRPT: CROSS DRAIN PIPE REPLACEM.ENTS IN D1ST#3 @ VARIOUS LOCATIONS . LUMP SUM PROJECT
OTH Share:
PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:
$250,000
UNDERWAY
$1,000,000 $800,000 $200,000
PROJECT: MOOOl78 TYPE W.ORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles I km) 0 10.00
DESCRPT: FORCE ACCOUNT MAINTENANCE ACTYITIES FOR FY 2001
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$15,000,000 $12,000,000
$3,000,000
PROJECT: MOOOl79 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (mileslkm) 010.00
DESCRPT: FORCE ACCOUNT MAINTENANCE ACTVITIES FOR FY 2002
PE:NONE. ROW: NONE CST: 2002 FED Share: GA Share:
$15,000,000 $12,060,000
$3,000,000
PROJECT: MOOOl80 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles I km) 0 10.00
DESCRPT: FORCE ACCOUNT MAINTENANCE ACTVITIES FOR FY 2003
.. '
((:
.~
.
~..:.:.>
PROJECT: M00033I TYPE WORK: BRIDGES
ATLANTA TMA TIP# .
LENGTH (miles I km)
DESCRPT: BRIDGE JACKING IN SEVERAL LOC IN D1ST 7
LUMP SUM PROJECT
FUND:,NHS 0/0.00
PE:NONE ROW: NONE CST: 2003 FED Share: GA Share:
PE: 2001 ROW: NONE CST: NONE
$15,000,000 $12,000,000
$3,000,000
$5,000
Page 16 0/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _ _ _ _ _.._ _
9/21/00
_ _.. ._~.,. ~....._ _ ~ ...
BCli _.....,..
. _ .a_ _
ALL COUNTY
PROJECT: M000460 TYPE WORK: PRELIMINARY ENGINEERING LENGTH (miles / km)
DESCRPT: LICENSE AND SUPPORT AGR,EEMENT FOR HMMS LUMP SUM PROJECT
FUND:STP 0/0.00
PE: 2001 ROW: NONE CST: NONE
$85,000
PROJECT: M000501 TYPE WORK: PRELIMINARY ENGINEERING
ATLANTA TMA TIP #
LENGTH (miles / km)
DESCRPT: DRAINAGE IMPROVEMENTS IN DISTRICT 7/PE ONL Y
LUMP SUM PROJECT
FUND:STP 0/0.00
PE: 2001 ROW: NONE CST: NONE
$10,000
PROJECT: NPSEOI- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 2001
FUND: PARK 0/0.00
PE:NONE ROW: NONE CST: 2001 FED Share:
$33,000 $33,000
PROJECT: NPSE02- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 2002
FUND: PARK 0/0.00
PE:NONE ROW: NONE CST: 2002 FED Share:
$40,000 $40,000
PROJECT: NPSE03- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 2003
FUND: PARK 0/0.00
PE:NONE ROW: NONE CST: 2003 FED Share:
$40,000 $40,000
PROJECT: NPSSOI- TYPE WORK: SIGNING LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 2001
FUND: PARK 0/0.00
PE:NONE ROW: NONE CST: 2001 FED Share:
$44,000 $44,000
PROJECT: NPSS02- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 2002
FUND: PARK 0/0.00
PE:NONE ROW: NONE CST: 2002 FED Share:
$40,000 $40,000
;<
(:~..~..
b~/
PROJECT: NPSS03- TYPE WORK: RESURFACE & MAINTENANCE LENGTH (miles / km)
DESCRPT: LUMP SUM NATIONAL PARK SERVICE FY 200.1
FUND: PARK 0/0.00
PE:NONE ROW: NONE CST: 2003 FED Share:
$40,000 $40,000
Page 17 of336
----~--------------,------~------------~------
STATE TRANSPORTATION IMPROVEMENTPROGRAM
..
...""..." 9/21/00
_ _
.._,,._'.l'.I._. .
_
ALL COUNTY
PROJECT: Q24S01- TYPE WORK: SIGNALS
FUND: STP
PE.NONE.
LENGTH (miles/km) 0/0.00
ROW: NONE
DESCRPT: LUMP SUM SIGNAL INSTALLA TION;UPGRADES & MAINTENANCE ANY AREA
CST: 200 I
FED Share:
GA Share:
$9,575,000 $7,660,000 $1,915,000
PROJECT: Q24S02- TYPE WORK: SIGNALS
FUND: STP
PE: NONE
LENGTH (miles/km) 0/0.00
ROW: NONE
DESCRPT: LUMP SUM SIGNAL INSTALLATION;UPGRADES & MAINTENANCE ANY AREA CST: 2002
FED Share:
GA Share:
$10,500,000 $8,400,000 $2,100,000
PROJECT: Q24S03- TYPE WORK: SIGNALS
FUND: STP
PE: NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: LUMP SUM SIGNAL INSTALLATION;UPGRADES & MAINTENANCE ANY AREA
CST: 2003
FED Share:
GA Share:
$10,500,000 $8,400,000 $2,100,000
PROJECT: Q76001- TYPE WORK: PRELIMINARY ENGINEERING
. FUND: MIN. GUARAN PE: 2001
I' LENGTH(miles/km) 0/0.00
ROW: NONE
DESCRPT: LUMP SUM FEDERAL PE FOR CONSULTANT SERVICES FOR FY 2001
CST: NONE
$5,000,000
PROJECT: Q76002- TfPE WORK: PRELIMINARY ENGINEERING
FUND: MIN. GUARAN PE: 2002
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: LUMP SUM FEDERAL PE FOR CONSULTANT SERVICES FOR FY 2002
CST: NONE
$9,999,000
PROJECT: Q76003- TYPE WORK: PRELIMINARY ENGINEERING
FUND: MIN. GUARAN PE: 2003
.
LENGTH (miles/km) 0/0.00"
. - ROW:NONE
DESCRPT: LUMP SUM FEDERAL PE FOR CONSULTANT SERVICES FOR FY 2003
CST: NONE
$9,999,000
PROJECT: T000041 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: DISTRICT I RURAL CAPITAL PROGRAM
F. <.
lcd'
PROJECT: T000042 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: DISTRICT 2 RURAL CAPITAL PROGRAM
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
$75,000 $67,000
$8,000 $8,000
$3 i 0,000
$276,000 $34,000 $34,000
Page J8 of336
____._-,_.---- STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
--,--_.----------,--------------_._._-'-------~-.
.
ALL COUNTY
PROJECT: T000043 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: DISTRICT 3 RURAL CAPITAL PROGRAM
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
$155,000 $138,000
$17,000 $17,000
PROJECT: T000044 TYPE WORK: CAPITAL LENG,TH (miles / km)
DESCRPT: DISTRICT 4 RURAL CAPITAL PROGRAM .
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
$298,000 $265,000
$33,000 $33,000
PROJECT: T000045 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: DISTRICT 5 RURAL CAPITAL PROGRAM
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
$214,000 $190,000
$24,000 $24,000
PROJECT: T000046 TYPE WORK: CAPITAL LENGTH (Miles/ km)
DESCRPT: DISTRICT 6 RURAL CAPITAL PROGRAM
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTHShare:
$318,000 $283,000 $35,000 $35,000
PROJECT: T000047 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: DISTRICT 7 RURAL OPERATING PROGRAM
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
$1,000 $1,000
PROJECT: T000048 TYPE WORK: CAPITAL LENGTH(miles / km)
DESCRPT: STATEWIDE RURAL CAPITAL SUPPLEMENT
PROJECT: T000049 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: INTERCITY BUS CAPITAL PROGRAM
{'
L.:5~~
PROJECT: T000050 TYPE WORK: OPERATING LENGTH (miles / km)
DESCRPT: DISTRICT I RURAL OPERATING PROGRAM
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
OTH Share:
$270,000 $240,000
$30,000 $30,000
$1,411,000 $1,254,000
$157,000 $157,000
$482,000 $241,000
$241,000
Page 19 of336
~-----------------------------------------~------- -
~;>-"_~
'STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _ '~
""'o;_,_""~_~
""...""""","",,,,
9/21/00
>_~''''_''''''
~''''"'.
tQ:_'''''_'''... .._ . ,,.:~:,..,t,
""""_..._ _
_
~_,
ALL COUNTY
PROJECT: T00005] TYPE WORK: OPERATING LENGTH (miles / km)
DESCRPT: DISTRICT 2 RURAL OPERATING PROGRAM
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
. $1,188,000 $594,000
PROJECT: T000052 TYPE WORK: OPERATING
.
LENGTH (miles / km)
DESCRPT: DISTRICT 3 RURAL OPERATING PROGRAM
OTHShare:
FUND: TRANsiT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
$594,000
$1,040,000 $520,000
PROJECT: T000053 TYPE WORK: OPERATING
,
LENGTH (miles / km)
DESCRPT: DISTRICT 4 RURAL OPERATING PROGRAM
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
$520,000
$226,000 $113,000
OTH Share:
$113,000
PROJECT: T000054 TYPE WORK: OPERATING LENGTH (miles / km)
DESCRPT: DISTRICT 5 RURAL OPERATING PROGRAM
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
OTHShare:
$272,000 $136,000
~
$136,000
. PROJECT: T000055 TYPE WORK: OPERATING
.
FUND: TRANSIT
PE: NONE
",
" .
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: DISTRICT 6 RURAL OPERATING PROGRAM
CST: 2003
$1,114,000
FED Share:
$557,000
PROJECT: T000056 TYPE WORK: OPERATING . LENGTH (miles / k;")
DESCRPT: DISTRICT 7 RURAL OPERATING PROGRAM
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
$557,000
$2,000 $1,000
OTH Share:
PROJECT: T000057 TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 0 /0.00
ROW: NONE
DESCRPT: STATEWIDE SUPPLEMENTAL FOR RURAL OPERATING PROGRAM
CST: 2003
FED Share:
$1,000
$600,000 $300,000
it' '-~
L~>
PROJECT: T000061 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 5310 FOR D.H.R. DISTRICT I
.OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
. ROW: NONE
CST: 2001
FED Share:
GA Share:
$300,000
$118,000 $118,000
$30,000
Page 20 'of336
_w_ ;,
STATE TRANSPORTATION IMPROVEMENT PROGRAM
Ql._.._ '_ _~~
9/21/00
.'..
..
ALL COUNTY
PROJECT: T000062 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 53 I0 FOR O.H.R. DISTRICT I
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
PROJECT: T000063 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 53 I0 FOR O.H.R. DISTRICT I
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
PROJECT: T000064 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 53 10 FOR O.H.R. DISTRICT 2
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
PROJECT: T000065 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY2002 SECTION 5310 FOR O.H.R. DISTRICT 2
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
PROJECT: T000066 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 53 I0 FOR O.H.R. DISTRICT 2
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
PROJECT: T000067 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 SECTION 5310 FOR O.H.R. DISTRICT 4
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
PROJECT: T000068 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR O.H.R. DISTRICT 4
FUND: TRANSIT
PE:.NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
PROJECT: T000069 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR O.H.R. DISTRICT 4
FUND: TRANSIT
PE:NONE.
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
.._
$124,000 $124,000
$31,000
$130,000 $130,000
$33,000
$85,000 $85,000 $21,000
$90,000 $90,000 $22,000
$94,000 $94,000 $24,000
$87,000 $87,000 $22,000
$91,000 $91,000 $23,000
$96,000 $96,000 $24,000
Page 21 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
_ _ _ _ _ _ _ :o\. _ _ .,.
_ _._ """~"" _......_ .
.,, _ _. . _ _
ALL COUNTY
PROJECT:. T000070 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 SECTION 5310 FOR DRR. DISTRICT 5
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
PROJECT: T000071 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR DRR. DISTRICT 5
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
.CST: 2002
FED Share:
G~ Share:
PROJECT: Toooon TYPE WORK: CAPITAL
. LENGTH (miles / km) DESCRPT: FY 2003 SECTION 5310 FOR O.H.R. DISTRICT 5
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
PROJECT: T000073 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 SECTION 5310 FOR O.H.R. DISTRICT 6
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
\..;:.;. "
PROJECT: T000074 TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: FY 2002 SECTION 5310 FOR ORR. DISTRICT 6
CST: 2002
FED Share:
GA Share:
PROJECT: T000075 TYPE WORK: CAPITAL
.
LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR ORR. DISTRICT 6
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
PROJECT: T000076 TYPE WORK: CAPITAL . LENGTH (miles / km)
DESCRPT: FY 2001 SECTION 5310 FOR ORR. DISTRICT 7
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
' r ''\0
!~ .~:
~
PROJECT: roooo TYPE WORK: CAPITAL
LENGTH (miles / km) DESCRPT: FY 2002 SECTION 5310 FOR ORR. DISTRICT 7
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:'
_
$61,000 $61,000 $15,000
$64,000 $64,000 $16,000
$67,000 $67,000 $17,000
$41,000 $41,000 $10,000
$43,000 $43,000 $11,000
$45,000 $45,000 $11,000
$36,000 $36,000 $9,000
$38,000 $38,000
$9,000
Page 22 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
-----,~--------- --_._--,--, 9/21/00 -----------------------
ALL COUNTY
PROJECT: T000078 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR O.H.R. DISTRICT 7
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$40,000 $40,000 $10,000
PROJECT: T000079 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 SECTION 5310 FOR D.H.R. DISTRICT 8
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$59,000 $59,000 $15,000
PROJECT: T000080 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR O.H.R. DISTRICT 8
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GAShare:
$62,000 $62,000 $16,000
PROJECT: T000081 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR O.H.R. DISTRICT 8
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$65,000 $65,000 $16,000
PROJECT: T000082 TYPE WORK: CAPITAL
I.
LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 5310 FOR O.H.R. DISTRICT 9
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Shure:
$61,000 $61,000 $15,000
PROJECT: T000083 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR O.H.R. DISTRICT 9
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$64,000 $64,000 $16,000
PROJECT: T000084 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR O.H.R. DISTRICT 9
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$67,000 $67,000 $17,000
:. .
Lj~:
PROJECT: T000085 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 5310 FOR O.H.R. DISTRICT 10
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
rso sss-
GA Shure:
$64,000 $64,000 $16,000
Page 23 of336
---------------------------------------,---------
STATE TRANSPORTATIONIMPROVEMENT PROGRAM
9/21/00
ALL COUNTY
PROJECT: T000086 TYPE WORK: CAPITAL , LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR DHK DISTRICT 10
FUND: TRANSIT
PE: NONE
0/0,00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$67,000 $67,000 $17,000
PROJECT: T000087 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR DHR. DISTRICT 10
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$71,000 $71,000 $18,000
PROJECT: T000088 TYPE WORK: CAPITAL, , LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 5310 FOR DHR. DISTRICT 11
FUND: TRANSIT
PE: NONE
0/0,00
ROW: NONE
CST: 2001
FEDShllre:
GA Share:
$21,000 $21,000 $5,000
PROJECT: T000089 TYPE WORK: CAPITAL
FUND: TRANSIT
PE: NONE
,
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: FY 2002 SECTION 5310 FOR DHR, DISTRICT I I
CST: 2002,
FEDShllre:
GA Share:
.;.
PROJECT: T000090 TYPE WORK: CAPITAL . LENGTH (miles / km)
, DESCRPT: FY 2003 SECTION 53 I0 FOR DHR. DISTRICT 11
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$22,000
$22,000
$6,000
e
'"
$24,000 $24,000 $6,000
PROJECT: T000091 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 200 I SECTION 5310 FOR DHR. DISTRICT 12
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$276,000 $276,000
$69,000
PROJECT: T000092 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 SECTION 5310 FOR DHR. DISTRICT 12
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FEDShllre:
GA Share:
$289,000 $289,000 $72,000
PROJECT: T000093 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 SECTION 5310 FOR DHR. DISTRICT 12
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FEDShllre:
GA Shure:
$304,000 $304,000
$76,000
Page 24 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
-------------------, 9121100 ------- ,----.-----
APPLING COUNTY
PROJECT: 00001/9 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: BAXLEY STREETSCAPE AND WELCOME CENTER
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$700,000 $560,000
OTH Share:
PROJECT: 0001216 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 1.79/2.88
DESCRPT: SR 4fUS I @ ALTAMAHA RIVER; OVERFLOW AND WILLIAMS CKrrOOMBS
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2002 ROW: CST:
$140,000
$100,000 AFTER 2003 AFTER 2003
PROJECT: 0001218 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 1.2/1.93
DESCRPT: SR 4fUS I @BLACK WATER & SWEET WATER CREEKS 2 MI S OF BAXLEY
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2002 ROW: CST:
$240,000 AFTER 2003 AFTER 2003
PROJECT: 522580- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 8/12.88
DESCRPT: SR 27fUS 341 FM CL OF SURRENCY TO W CL OF ODUMf WAYNE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 52258X- 523265-
PROJECT: 522590- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 27IUS 341 FM 4-LN IN BAXLEY TO W CL OF SURRENCY EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STATE 10 / 16. /0
PE: 1994 ROW: 2002 CST:
UNDERWAY $922,000
AFTER 2003
PE: 1994 ROW: 2001 CST:
UNDERWAY $323,000
AFTER 2003
PROJECT: 532460- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / ~m) 2.86/4.60
DESCRPT: SR 15 FM CR 53 liMP 16.73 TO CR202f4I7IMP 19.59 S OF BAXLEY
EXIST. LANES: 02 PROPOSED LANES: 05
PE: 2001 ROW: 2002 CST:
$198,000 $180,000 AFTER 2003
PROJECT: 533165- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2001
LENGTH (miles / km) 0.24/0.39
ROW: 2001
DESCRPT: SR 15 @ BIG SATILLA CREEK OfF .21 MI N OF PIERCE CO LN
CST: 2003
FED Share:
GA Share:
~t::
PROJECT: 53317X- TYPE WORK:' REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km}
0/0.00
DESCRPT: SR 15 @BIG SATILLA CREEK AT APPLING CO LNISEE PIERCE 533170
ASSOCIATED PROJECTS: 533170-
PE:NONE ROW: NONE CST: NONE
$20,000 $/0,000 $608,000 $486,400 $121,600
Page 250/336
-----------------,.,-_._--_.._ - - - - - - - - - - - - - - - - - - - -
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
ATKINSON COUNTY
PROJECT: 0000688 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (mileslkm) 0.21/0.34
DESCRPT: SR 135 @ DARK BAY CREEK APP 4 MI N OF WILLACOOCHE
PE: 2001 ROW: 2002 CST:
, $20,000 $10,000
AFTER 2003
PROJECT: 432105- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.26/0.42
ROW: 2001
DESCRPT: SR 135 @ALAPAHA RIVER OVERFLOW APP 3 MLS OF JCT SR 520
, CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$1,283,000 $1,026,400
$256,600
PROJECT: 432106- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.26 /0.42
DESCRPT: SR 135 @ALAPAHA RIVER OVERFLOW APP 2 MI SOF JCT SR 520 & Y
ROW: 2001 CST: 2002
FED Share:
ASSOCIATED PROJECTS: 43Y106-
GA Share:
UNDERWAY $10,000 $783,000 $626,400
$156,600
,PROJECT: 432107- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
UNDERWAY
LENGTH (miles / km) 0.21 10.34
ROW: 2001
$10,000
DESCRPT: SR 135 @ PUDDING CREEK APP 1.5 MI N JCT SR 520
CST: 2002
$723,000
FED Share:
$578,400
GA Share:
$144,600
;:"
"
PROJECT: 4321 IX- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles 1 km) 010.00
DESCRPT: SR 135 @ALAPAHA RIVER @ ATKINSON CO LINEISEE BERRIEN 432110
PE:NONE ROW: NONE CST: NONE
ASSOCIATED PROJECTS: 432110-
PROJECT: 43YIQ6- TYPE WORK: REPLACE BRIDGE
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: SR 135 @ALAPAHA RIVER OVERFLOW - FOR STP $1 SEE 432106-
ASSOCIATED PROJECTS: 432106-
PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:
UNDERWAY
$500,000 $40.0,000 $100,000
~, : ~;:
,'
Page 26 of336
----------....,------.--_.-_._ _ ... - - - - - - - - -
-_ ._------- -_ .. __ _-~._.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
,-------_._-- 9/21/00-------_._-----"... ....
BACON COUNTY
PROJECT: 0001155 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles/km)
DESCRPT: SR 32 AT SR 4 ALT IN ALMA LUMP SUM PROJECT
FUND: STP 0.1/0.16
PE: 2001 ROW: 2002 CST: 2003 FEDSilare: GA Share:
$5,000 $10,000 $83,000 $74,700 $8,300
. ~:-
,=.
ba::'
Page 27 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_.. ----_._._-_._._---_. _?/.2_1/0-0,,-----------_._-- -------
BAKER COUNTY
PROJECT: 431710- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.8/1.29 DESCRPT: SR 91/PETER ZACKGEER HWY@ICHAWAYNOCHAWAYCKNOFSR253
PE: 1997 ROW: 2001 CST:
UNDERWAY $35,000
AFTER 2003
PROJECT: 442850- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.18 /0.29
ROW: LOCL
DESCRPT: CR 124/FAS 1630 @BIG CYPRESS CREEK APP 12 MI SW OF NEWTON
CST: 2001
FED Share:
GA Share:
UNDERWAY
$388,000 $310,400
$77,600
PROJECT: 442860- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.12 /0.19
ROW: LOCL
DESCRPT: CR 67/JONES ROAD @ MILL CREEK APP 16 MI NW OF NEWTON
CST: 2002
FED Share:
GA Share:
UNDERWAY
$388,000 $310,400
$77,600
PROJECT: 471420- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1998
LENGTH (miles / km) 0.12/0.19
ROW: LOCL
DESCRPT: CR l2l/CLEAR LAKE ROAD@CHICKASAWHATCHEECREEKEOFSR37
CST: 2001
FED Share:
GA Share:
UNDERWAY
$1,200,000 $960,000 $240,000
f'
t;:i:'
Page 28 0/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
BALDWIN COUNTY
PROJECT: 0000148 TYPE WORK: HISTORIC PRESERVATION
FUND: STP
LENGTH (mileslkm) 010.00
DESCRPT: MILLEDGEVILLE RR DEPOT RESTORATION & LANDSCAPING
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 0000346 TYPE WORK: NEW CONSTRUCTION
FUND: STATE
LENGTH (miles I km) 8.8 I 14.17
DESCRPT: FALL LINE FWY ON NEW LOC FM US 441IWILKINSON CO TO SR 24
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 2001 CST:
$1,000,000 $800,000
$200,000
UNDERWAY $1,800,000 AFTER 2003
PROJECT: 222280- TYPE WORK: WIDENING
FUND: HPP
LENGTH (miles I km) 7.5 112.08
DESCRPT: SR 24/SR 540 FM SOUTH OF CR 186 TO CR lOIN WASHINGTON CO
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIA TED PROJECTS: 22228X-
PE: 1993 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $2,001,000 $18,395,000 $14,716,000 $3,679,000
PROJECT: 231450- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles I km) 2.4 13.86
DESCRPT: SR 49 FM JUST W. OF ALLEN MEMORIAL RD TO MILLEDGEVILLE BYP
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1997 ROW: 2002 CST:
UNDERWAY $105,000
AFTER 2003
PROJECT: 232240- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (mileslkm) 0.45/0.72
DESCRPT: SR 22/SR 24 AT LAKE LAUREL RD/CR 472 EAST OF MILLEDGEVILLE
LUMP SUM PROJECT
PE: 1999 ROW: 2001 CST: 2001 FED Share: GA Share:
UNDERWAY $32,000
$232,000 $208,800
$23,200
PROJECT: 232260- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.2 I 10.34
DESCRPT: SR 22 @ CS 558 TATTN ALL STREET IN WEST MILLEDGEVILLE
PE: 2001 ROW: 2003 CST:
$66,000 $10,000 AFTER 2003
PROJECT: 245405- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
LENGTH (miles I km). 0.24 10.39
DESCRPT: SR 243/US 441 BUS. @ FISHING CREEK SOUTH MILLEDGEVILLE
PE: 2001 ROW: CST:
$131,000 AFTER 2003 AFTER 2003
PROJECT: 26247X- TYPE WORK: NEW CONSTRUCTION
FUND: STATE
LENGTH (miles I km) 0 10.00
DESCRPT: FALL LINE FWY-NEW LOC FM N GORDON BYP TO SR 24/SEE WILKINSON
ASSOCIATED PROJECTS: 262470-
PE:NONE ROW: NONE CST: NONE
Page 29 of336
ST~TE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
BALDWIN COUNTY
PROJECT: 270700- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1998
LENGTH (miles / km) 0.22/0.35
ROW: LOCL
DESCRPT: CR 72/PETTIGREW ROAD @ FISHING CREEK 6.3 MI W OF MILLEDGEVIL
CST: 2002
FED Share:
GA Share;
UNDERWAY
$633,000 $506,400 $126,600
.PROJECT:, 271287- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
I.
LENGTH (miles / km) 0/0.00
DESCRPT: BIKE/PED TRAIL FM MILLEDGEVILLE TO GC&SU CAMPUS & H.S.
PE:LOCL ROW: LOCL CST: 2001 . FED Share:
OTHShare:
$400,000 $320,000
$80,000
,.
Page 30 of336
STATE TRANSPORTA TION IMPROVEMENT PROGRAM
--_ _----_._- ..__ 9/21/00.._,._.
.......
.~_,_.
.*ffl._._. ._._..
..._.._._. _
_._~
BANKS COUNTY
PROJECT: 0000158 TYPE WORK: SIDEWALKS
FUND: STP
LENGTH (miles 1 km) 010.00
DESCRPT: BANKS CROSSING CORRIDOR BEAUTIFICATION & SIDEWALKS
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$600,000 $480,000
PROJECT: 0000470 TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles 1 km) 0.6/0.97
DESCRPT: 1-85 SAFETY UPGRADES @ SR 15; SR 63 AND SR 51/320/FRANKLIN
ASSOCIA TED PROJECTS: 00004XO
OTHSIUlre:
PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:
$120,000 .
UNDERWAY
$13,800,000 $12,420,000
$1,380,000
PROJECT: 142265- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 51 @ GROVE CREEK 7 MI WEST OF HOMER
FUND: BRIDGE
PE: 1999
0.21 10.34
ROW: 2001
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$348,000 $278,400
$69,600
PROJECT: 142266- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (mileslkm) 0.22/0.35
ROW: 2001
DESCRPT: SR 105 @MIDDLE FORK BROAD RIVER 9.6 MI NORTH OF HOMER
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$201,000 $160,800
$40,200
Page 31 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
BARROW COUNTY
PROJECT: 0000950 TYPE WORK: NEW CONSTRUCTION LENGTH (miles I km)
DESCRPT: SR 316 AT SR 81 - LOCAL SERVICE ROAD
FUND: STATE 0.2 10.32
PE: 1996 ROW: NONE CST: 2001
GA Share:
UNDERWAY $350,000 $350,000
PROJECT: 121730- TYPE WORK: NEW CONSTRUCTION
FUND: STP
LENGTH (miles I km) 2.6/4.19
DESCRPT: WINQER EAST BYP/SR 988 FM SR 316 (INCL INTERCHANGE) TO SR 53
EXIST. LANES: 00 PROPOSED LANES: 04
PE: 1998 ROW: 2001 .CST:
UNDERWAY $5,278,000 AFTER 2003
PROJECT: 12R870- TYPE WORK: . INTERCHANGE
FUND: NHS
LENGTH (mileslkm) 010.00
DESCRPT: SR 316 IN BARROW AND OCONEE COS-26 INTCHG FOR ADDL RWII 22870
ASSOCIATED PROJECT.S: 122870~ 122870-
PE: 1996 ROW: 2001 CST: NONE
UNDERWAY $12,500,000
PROJECT: 132570- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (mileslkm) 0.21/0.34
ROW: 2000
DESCRPT: SR 53/GAINESVILLE HWY. @ CEDAR C~EEK 2.7 MI NORTH OF WINDER
CST: 2001
FED Share:
ASSOCIATED PROJECTS: ,132670-
GA Share:
UNDERWAY UNDERWAY
$662,000 $529,600 $132,400
PROJECT: 132670- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles I km) 0.2 10.32
DESCRPT: SR 53 AT ROCKWELL CHURCH RD/CR 4 NORTH OF WINDER
ASSOCIATED PROJECTS: 132570- .
PE: 1996 ROW: 1997 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$315,000 $252,000
$63,000
PROJECT: 132970- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.22/0.35
DESCRPT: SR II/WINDER-MONROE HWY. @ MARBURY CREEK SO OF WINDER
PE: 1999 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 132971- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.22/0.35
DESCRPT: SR II/WINDER-MONROE HWY. @ SCOTT CREEK SOUTH OF BETHLEHEM
PE: 1999 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 142130- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles I km) 0.66/1.06
DESCRPT: SR 211 AT ROCKWELL CHURCH RD/CR 4/CEDAR HILL RD/CR 327
LUMP SUM PROJECT
PE: 1998 ROW: 2001 CST: 2001 FED Share: GA Share:
UNDERWAY $1,000,000 $1,159,000 $1,043,100
$115,900
Page 31 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
-- 9/21/00 -----------------
BARROW COUNTY
PROJECT: 171600- TYPE WORK: RAIL PROJECTS
FUND:NHS
ATHENS TIP #
LENGTH (miles I km) 0 10.00
DESCRPT: COMMUTER RAIL DACULA TO ATHENS/CLARKE - PHASE 4 PROPOSED TCM
PE:NONE ROW: 2002 CST: 2003 FED Share: GA Share:
$5,000,000 $ 15,000,000 $12,000,000
$3,000,000
. ~\
LJ
Page 33 of336
---
STATE TRANSPORTAi70N IMPROVEMENT PROGRAM
$,_.
9/21/00
_
BARTOW COUNTY
PROJECT: 0000291 TYPE WORK: REALIGNMENT
FUND: STP
LENGTH (miles 1 km) 1.16/1.87
DESCRPT: OLD ALA RDISR 113 RELOC FM EAST OF SR 293 @ CSX RR TO 1-75
EXIST, LANES: 00 PROPOSED LANES: 04
'
PE: 1998 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $1,322,000 $7,890,000 $6,312,000 $1,578,000
PROJECT: 0000932 TYPE WORK: INTERCHANGE LENGTH (miles 1 km)
DESCRPT: 1-75 SAFETY UPGRADES @ SR 61
FUND: 1M 0.2/0.32
' PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$2,800,000 $2,520,000
$280,000
PROJECT: 620832- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 61 @ ETOWAH RIVER & APPROACHES EXIST ..LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 621255-
FUND: BRIDGE
PE: 1994
0.63/1.01
ROW: 1987
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY
$4,262,000 $3,409,600
$852,400
PROJECT: 621130- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1988
LENGTH (miles 1 km) 0.3/0.48
ROW: 2001
DESCRPT: SR 113 BRIDGE & APPROACHES OVER HILLS CREEK
CST: 2002
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
GA Share:
.<
:~-.. .
PROJECT: 621250- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles 1 km) 2.4 13.86
DESCRPT: SR 61/CARTERSVILLE FM GILMER ST TO SR 20/lNCL I-WAY PAIR
EXIST. LANES: 03 PROPOSED LANES: 05
PE: 1992 ROW: 2002 CST:
UNDERWAY $50,000
$462,000 $369,600
$92,400
UNDERWAY $1,198,000 AFTER 2003
PROJECT: 621255- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles 1 km) 2.61 14.20
DESCRPT: SR 61/SR I 13 FM CR 533 NO TO PLYMOUTH DRiCARTERSVILLEIEXC BR
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 620832-
PE: 1992 ROW: 1997 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$4,144,000 $3,315,200
$828,800
PROJECT: 621350- TYPE WORK: WIDENING
,
LENGTH (miles 1 km)
DESCRPT: SR 20 FM SR 61 TO 1-75 (INCL INTCH WISR 61 & US 41)
EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 2.47/3.98
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Shure:
UNDERWAY $3,456,000
$13,751,000 $11,000,800
$2,750,200
f'
t~~~~;
PROJECT: 621410- TYPE WORK: REALIGNMENT
FUND: STP
LENGTH (miles 1 km) 5.35 18.61
DESCRPT: OLD ALA RDISR 113 RELOC FM SR 113--PUMPKINVINE CK-TO CR 699
PE: 1998 ROW: 2001 CST:
UNDERWAY $3,360,000 AFTER 2003
Page 34 of336
""' .. - _
_,
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
lll
_ _... _ ,... _ " '...
_ __..__
....-~~~ _~
_
I''J
.... _ ' = .. ....
_~
"'..
BARTOW COUNTY
PROJECT: 621415- TYPE WORK: REALIGNMENT
FUND: STP
LENGTH (miles / km) 1.97/3.17
DESCRPT: OLD ALA RDISR 113 RELOC FM CR 699 TO EAST OF SR 293 @CSX RR
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1998 ROW: 2001 CST: 2003 FED Share: GA Share:
_
UNDERWAY $2,078,000 $9,034,000 $7,227,200 $1,806,800
PROJECT: 621430- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 4.7/7.57
DESCRPT: SR 113 FMSITAYLORSVILLE CL NE TO CR 31ISTILESBORO/POLK
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 62143X- 621435-
PE: 1993 ROW: 2001 CST:
UNDERWAY $2,345,000 AFTER 2003
PROJECT: 621435- TYPE WORK: BRIDGE REHAB LENGTH (miles / km)
DESCRPT: SR 113 @DRY CREEK EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 621430-
FUND: BRIDGE
PE: 1993
0.16/0.26
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY $50,000
$221,000 $176,800
$44,200
PROJECT: 621440- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 113 FM CR 311STILESBORO NE TO SR 61 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 621760-
FUND: STP 4.3 /6.92
PE: 1998 ROW: 2002 CST:
UNDERWAY $2,855,000 AFTER 2003
PROJECT: 621710- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 4.15 /6.68
DESCRPT: SR 20 EB & WB MP 17.8-19.3; EB 19.3-20.75; WB MP 20.75-21.95
EXIST. LANES: 02 PROPOSED LANES: 03
ASSOCIATED PROJECTS: 631510-
PE: 1998 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $2,213,000 $4,876,000 $3,900,800 $975,200
PROJECT: 621760- TYPE WORK: REPLACE BRIDGE
.
LENGTH (miles / km)
DESCRPT: STATE ROUTE 113 @RICHLAND CREEK
FUND: BRIDGE
0.2/0.32
PE: 1993 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 622150- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR 61 AT OLD ALABAMA RD/CARNES RD/CR 636 LUMP SUM PROJECT
FUND: STP
0.22/0.35
PE: 1999 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $23,000
$692,000 $622,800
$69,200
c'. :'
t~sF
PROJECT: 62Y135- TYPE WORK: TURN LANES
FUND: NHS
LENGTH (miles / km) 4.1 /6.60
s DESCRPT: SR 20 FM SR I IN FLOYD TO SR 3 FOR RURAL SEE 622135
ASSOCIATED PROJECTS: 622135-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$5,862,000 $4,689,600 $1,172,400
Page 35 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
---~,~,._-----------------------------_._._--~_._------
BARTOW COUNTY
PROJECT: 631510- TYPE WORK: BRIDGE REHAB LENGTH (miles 1 km)
DESCRPT: SR 20 AT STAMP CREEK 5.8 MI SE OF WHITE
ASSOCIATED PROJECTS:- 621710-
, FUND: BRIDGE
PE: 1996
0.22/0.35
ROW: 2002
CST: 2003
FED Share:
GA Share:
, UNDERWAY $34,000
.. $907,000 $725,600 $181,400
PROJECT: 631515~ TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
LENGTH (miles 1 km)' 0.22/0.35
DESCRPT: SR 20 @ BOSTON CREEK 6.2 MILES SE OF WHITE .
ASSOCIATED PROJECTS: 621710-
PE: 1996 ROW: 2002 CST:
UNDERWAY $24,000
AFTER 2003
PROJECT: 632925- TYPE WORK: BRIDGES
FUND: STP
LENGTH (miles 1 km) . 010.00
DESCRPT: DECK HYDRODEMOLITION ON 2 BRIDGES IN BARTOW COUNTY
LUMP SUM PROJECT
PE:NONE ROW: NONE CST: 2001 ' FED Share: GA Share:
$38,000 $30,400
$7,600
PROJECT: 642035- TYPE WORK: PASSING LANES
FUND: STP'
LENGTH (miles 1 km) 2.8 14.51
. '"DESCRPT: SR 140 EB MP 19.05-20.0;WB MP 20.00-20.95;EB MP 20.95-21.90
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 2000 ROW: 2002 CST:
UNDERWAY $137,000
AFJER2003
PROJECT: 642100- TYPE WORK: BRIDGE REHAB
FUND: STP
LENGTH (mileslkm) 0.45'/0.72
DESCRPT: CSX RAILROAD UNDERPASS RELOC AT SR 293 NORTH OF CARTERSVILLE, !
. PE: 2000 ROW: 2002 CST: ,
UNDERWAY $847,000
AFTER 2003
PROJECT: 662205- TYPE WORK: NEW CONSTRUCTION LENGTH (miles 1 km)
DESCRPT: OUTER PERIMETER FM CR 623 EAST TO SR 3/US 4 I EXIST. LANES: 00 PROPOSED LANES: 04
FUND: STATE 6.7/10.79
PE: 2003 ROW: CST:
. $228,000 AFTER 2003 AFTER 2003
PROJECT: 671204- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: MULTI-USE TRAIL IN EUHARLEE
FUND:STP 0/0.00
PE:LOCL ROW: LOCL CST: 200) FED Share:
OTHShare:
PROJECT: 671225- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.27 /0.43
ROW: LOCL
DESCRPT: CR 851/HARDIN BRIDGE ROAD @ ETOWAH RIVER NORTH OF EUHARLEE
CST: 2003
FED Share:
OTH Share:
$100,000 $80,000
$20,000 UNDERWAY
$I,~OO,OOO
$1,200,000
$300,000
Page 36 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
BEN HILL COUNTY
PROJECT: 0000120 TYPE WORK: B1CYCLEIPED. FACILITY
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: FITZGERALD DOWNTOWN REVITALIZATION & STREETSCAPE
PE:LOCL ROW: LOCL
CST: 2001 FED Share:
PROJECT: 471440- TYPE WORK: BICYCLEIPED. FACILITY LENGTH (miles / km)
DESCRPT: STREETSCAPES IN THE CITY OF FITZGERALD
FUND:STP 0/0.00
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
$875,000 $700,000 $175,000
$625,000 $500,000 $125.000
Page 37 of336
------------------------,--._------------
STATE TRANSPORTATION IMPROVEMENTPROGRAM
,9/21/00
. _ - , - - - - _... - _.....> " - ' -......._ ............- - - " ' , " " , - - - - - - - - - " - - - _ . _ - - , - -..._ - - - - - -
BERRIEN COUNTY
PROJECT: 0000121 TYPE WORK: BlCYCLE/PED. FACILITY , LENGTH (miles / km)
DESCRPT: ALAPAHA WALKING TRAIL
FUND:STP 0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
~
$16,000
$13,000
~"
PROJECT: 0000208 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR 761ADEL ROAD AT DOGWOOD DRIVEICR 356 LUMP SUM PROJECT
FUND: STP 0.25 /0.40
OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
$3,000
UNDERWAY
$318,000 $286,200
$31,800
PROJECT: 432110- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 135 @ALAPAHA RIVER@ATKINSON CO LINE
ASSOCIATED PROJECTS: 4321 IX-
FUND: BRIDGE
PE: 1999
0.41 /0.66
ROW: 2002
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$2,846,000 $2,276,800
$569,200
PROJECT: 432 I I 1- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.23/0.37
DESCRPT: SR 125 @ NEW RIVER NEAR BERRIEN-TIFT CO LINE
ASSOCIATED PROJECTS: 43211 Z-
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 442920- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.23/0.37
ROW: 2001
DESCRPT: SR 64/SR 84/SR 168 @ ALAPAHA RIVER OVERFLOW NEAR ATKINSON CO.
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$468,000 $374,400 $93,600
PROJECT: 442925- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles/km) 0.23/0.37
ROW: 2001
DESCRPT: SR 168@TEN MILE CREEK APP 4.5 MI EAST OF JCT SR II
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000 $593,000
$474,400 $118,600
PROJECT: 442930- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.22/0.35
ROW: 2001
DESCRPT: SR 168 @ FIVE MILE CREEK APP 2.8 MI WEST OF JCT SR 135
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$539,000 $431,200 $107,800
PROJECT: 442931- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.24 /0.39
ROW: 2003
DESCRPT: SR 37 @ CAT CREEK IN RAY CITY
f:
CST:
~..:;;
UNDERWAY $10,000
AFTER 2003
Page 38 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
--------------------
9/21/00
------
0
' . , - - - -
._.,._._.
_
BIBB COUNTY
PROJECT: 0000122 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
MACON TIP # MCN-n
LENGTH (miles I km) 0.5 10.81
DESCRPT: SEC 102/103 OF OCMULGEE HERITAGE GREENWAY TRAIL/LANDSCAPING
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$1,000,000 $800,000
OTH Share:
PROJECT: 0000566 TYPE WORK: WIDENING
FUND: STP
MACON TIP # MCN-39
LENGTH (miles I km) 5.45 18.77
DESCRPT: SARDIS CHURCH RD/CR 717 FROM 1-75 TO SR 247IHA WKINSVILLE RD
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2001 ROW: 2002 CST: 2003 FED Share: GA Share:
$200,000
$5,000 $2,132,000 $14,000,000 $11,200,000 $2,800,000
PROJECT: 0000835 TYPE WORK: BRIDGE REHAB
FUND: STP
MACON TIP # MCN-28
LENGTH (miles I km) 0.2 10.32
DESCRPT: JEFFERSONVILLE RD AT NORFOLK' SOUTHERN RAILROAD
EXIST. LANES: 02 PROPOSED LANES; 05
ASSOCIATED PROJECTS; 351080-
PE: 1996 ROW: NONE CST: 2003 FED Share: GA Share:
UNDERWAY
$4,839,000 $3,871,200
$967,800
PROJECT: 0000954 TYPE WORK: LIGHTING
FUND: OTHER
MACON TIP #
LENGTH (miles I km) 0/0.00
DESCRPT: 1-16 FM EAST OF CENTRAL OF GA RR TO SR 87/US 129 IN MACON
LUMP SUM PROJECT
PE: 2001 ROW: NONE CST: 2001
GA Share:
$125,000 $1,500,000 $1,500,000
PROJECT: 000 I017 TYPE WORK: BICYCLEIPED. FACILITY
FUND: REC TRAILS PE: NONE
MACON TIP # DNR-3
LENGTH (miles I km) 0.5 10.8 I
ROW: NONE
DESCRPT: DNR REC TRAILS - OCMULGEE GREENWAY TRAIL FM 2ND TO GATEWAY
CST: 200 I
FED Share:
OTHShare:
PROJECT: 0001078 TYPE WORK: BICYCLE/PED. FACILITY
FUND: REC TRAILS PE: NONE
MACON TIP # DNR-4
LENGTH (miles I km) 0.4 10.64
ROW: NONE
DESCRPT: DNR REC TRAILS - OCMULGEE GREENWAY TRAIL FM SPRING TO 2ND
CST: 200 I
FED Share:
PROJECT: 310980- TYPE WORK: INTERCHANGE
FUND: NHS
MACON TIP # MCN- I I
LENGTH (miles I km) 0.97 I 1.56
DESCRPT: 1-16 @SR540INCL 1-16 ML BR @SAL RRjl STREAM & 1 RIVER
OTHShare:
PE: 1986 ROW: 2001 CST:
$125,000 $100,000
$25,000
$125,000 $\00,000
$25,000 UNDERWAY
$500,000 AFTER 2003
y:{. -. t~J:'
PROJECT: 3 I 1000- TYPE WORK: WIDENING
FUND: NHS
MACON TIP # MCN-IO
LENGTH (miles I km) 1.86/2.99
DESCRPT: 1-16/MACON FM SR II EAST TO SR 87 INCLBRIDGES & CD IEXC MLK
EXIST. LANES; 04 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 311400-
PE: 1986 ROW: 2002 CST:
UNDERWAY $7,000,000 AFTER 2003
Page 39 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
BIBB COUNTY
PROJECT: 311005- TYPE WORK: BRIDGE REHAB
FUND: NHS
MACON TIP # MCN-66 '
' LENGTH (miles / km) 0,25 /0.40
DESCRPT: 1-16 IN MACON- BRIDGE AT MARTIN LUTHER KING DRIVE
EXIST. LANES: 04 PROPOSr:D LANES: 06
PE: 1986 ROW: NONE CST: 2003 FED Share: GA Share:
UNDERWAY
$10,000,000 $8,000,000 $2,000,000
PROJECT: 311400- TYPE WORK: WIDENING
MACON TIP # MCN-13
LENGTH (miles / km)
DESCRPT: 1-75/MACON FROM PIERCE AVE/CR 478 EAST TO 1-16
EXIST. LANES: 04 PR0I.'OSED LANES: 06
ASSOCIATED PROJECTS: 311000-
FUND: NHS 1,62 /2,61
PE: 1992 ROW: 2003 CST:
UNDERWAY $10,000,000 AFTER 2003
PROJECT: 311460- TYPE WORK: BRIDGI;: REHAB
FUND: 1M
MACON TIP # MCN-I A
LENGTH (miles / km) 0.45 /0,72
DESCRPT: RECONSTRUCT HARTLEY BRIDGE RD/CR 740 BRIDGE & APP OVER 1-75
EXIST. LANES: 02 PROPOSED LANES: 05
PE: 1992 ROW: 2001 CST: 2001 , FED Share: GA Share:
UNDERWAY $5,247,000 $4,875,000 $4,387,500 $487,500
PROJECT: 3 11465- TYPE WORK: INTERCHANGE
MACON TIP # MCN-IB
,LENGTH (miles / km)
DESCRPT: 1-75!1-475 INTERCHANGE @ HARTLEY BRIDGE RD
FUND: 1M 2,7/4,35
PE: 1992 ROW: 2001 CST:
UNDERWAY $2,000,000 AFTER 2003
PROJECT: 311910- TYPE WORK: INTERCHANGE
MACON TIP # MCN-15
LENGTH (miles / km)
DESCRPT: 1-75 NEW INTERCHANGE AT,SARDIS CHURCH RD
FUND: NHS 0,2 /0.32
PE: 1997 ROW: 2002 CST: 2003
FEDSh~lre:
GA Share:
UNDERWAY $1,256,000 $6,889,000 $5,511,200 $1,377,800
PROJECT: 311950- TYPE WORK: INTERCHANGE
FUND: NHS
MACON TIP # MCN-54
LENGTH (miles / km) 0.5 /0.81
DESCRPT: 1-475IZEBULON RD INTERCHANGE MODIFICATION {INCL LIGHTING}
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $180,000
$3,978,000 $3,182,400
$795,600
. PROJECT: 311992- TYPE WORK: BARRIERS
FUND:NHS
MACON TIP # MCN-71
LENGTH (miles / km) 0/0.00
, DESCRPT: 1-475 FM 1-75 NR HARTLEY BRDGE RD TO. 1-75/NOISE BARRIER WALL
PE: 1997 ROW: NONE CST: 2002 FED Share: GA Share:
UNDERWAY
. $2,900,000 $2,320,000
$580,000
# :.
W:;
PROJECT: 312090- TYPE WORK: WIDENING
FUND:NHS
MACON TIP # MCN-60
LENGTH (miles / km) 2.47/3.98
DESCRPT: 1-75 FM PIERCE AVE/SR 247/US 41 TO ARKWRIGHT ROAD
EXIST. LANES: 04 PROPOSED LANES: 06
PE: 1998 ROW: 2002 CST: 2003 FED Share: GA Shnre:
UNDERWAY $2,000,000 $9,000,000 $7,200,000 $1,800,000
Page 40 of336
STATE TRANSPORTATioN IMPROVEMENT PROGRAM
~,---,_._._---------
,-9-/2-1/-00_._._-----------
BIBB COUNTY
PROJECT: 322000- TYPE WORK: WIDENING
FUND: STP
MACONTIP#MCN-18
LENGTH (miles 1 km) 2.29/3.69
DESCRPT: SR 87IRIVERSIDE DR/MACON FM HALL RD TO NORTHSIDE DR
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 322005-
PE: 1992 ROW: 2002 CST:
UNDERWAY $1,000,000 AFTER 2003
PROJECT: 32296X- TYPE WORK: WIDENING
FUND: NHS
MACON TIP #
LENGTH (miles / km) 0/0.00
DESCRPT: SR 247/US 129 FM GREEN STREET/GATE I/HOUSTON TO US 41/BIBB
EXIST. LANES: 04 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 322960-
PE:NONE ROW.'NONE CST: NONE
PROJECT: 323010- TYPE WORK: ATMS/ITS
MACON TIP # MCN-17
LENGTH (miles / km)
DESCRPT: ATMS MAINTENANCE IN MACON FOR 2001
FUND: NHS 0/0.00
PE: NONE ROW: NONE
CST: 2001 FED Share:
GA Share:
$200,000 $160,000
$40,000
PROJECT: 323015- TYPE WORK: ATMSIITS
MACON TIP # MCN-17
LENGTH (miles 1 km)
DESCRPT: ATMS MAINTENANCE IN MACON FOR 2002
FUND:NHS 0/0.00
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$200,000 $160,000 $40,000
PROJECT: 323020- TYPE WORK: ATMS/ITS
MACON TIP # MCN-I7
LENGTH (miles 1km)
DESCRPT: ATMS MAINTENANCE IN MACON FOR 2003
FUND: NHS 0/0.00
PE: NONE ROW: NONE CST: 2003 FED Share: GA Share:
$200,000 $160,000
$40,000
PROJECT: 323045- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
MACON TIP # MCN-7
LENGTH (miles/ km) 0.23/0.37
DESCRPT: SR 247IUS 129 SBL @ NOR-SOU RAILROAD S OF MACON CTY LIMIT
EXIST. LANES: 04 PROPOSED LANES: 06
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 331870- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
MACON TIP # MCN-47
LENGTH (miles / km) 0.18 /0.29
ROW: LOCL
DESCRPT: CR 742ITUCKER ROAD@ROCKYCREEK I MI W OF MACON CTY LMTS
CST: 2001
FED Share:
GA Share:
UNDERWAY
$557,000 $445,600 $111,400
;:
~i...:.:_::::-.
PROJECT: 332230- TYPE WORK: PASSING LANES
MACON TIP # MCN-5I
LENGTH (miles / km)
DESCRPT: SR 19 PASSING LANES NB FM MP 19.127 TO MP 20.370
EXIST. LANES: 02 PROPOSED LANES: 03
FUND: STP 1.24 /2.00
PE: 1999 ROW: 2002 CST:
UNDERWAY $137,000
AFTER 2003
Page 41 0/336
_ _
<>"
STATE TRANSPORTATION IMPROVEMENT PROGRAM
l"'._. ,.._..." _ _, ~
_=_._,_. . . "'__ 9/21/00 .._..__ __
"'_.
~"'~,
~-_'_W"'_T
~
~"",..
BIBB COUNTY
PROJECT: 333050- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
'MACON TIP # MCN-69A
LENGTH (miles / km) 0.2/0.32
DESCRPT: SR 87/MAC01'/ AT JOE TAMPLIN IND BLVD& 1-16 - PHASE IA
PE: 2002 ROW: LOCL CST:
..
$5,000 AFTER 2003
PROJECT: 333055~ TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
MACON TIP # MCN-69B
LENGTH (miles / km) 1.2/1.93
DESCRPT: SR 87/MACON FM JOE TAMPLIN EXT TO & ALONG WEAVER RD - PH IB
'PE:1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$3,274,000 $2,619,200 . $654,800
PROJECT: 333090- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
MACON TIP # MCN-43
LENGTH (miles / km) 4.25/6.84
DESCRPT: SR 247IUS 129 FROM HOUSTON CO LINE TO NORTH OF SOFKEE RD
LUMP SUM PROJECT
PE: 1999 ROW: LOCL CST: ~OOI FED Share: GA Share:
UNDERWAY
$935,000 $841,500
$93,500
PROJECT: 333 150- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
MACON TIP # MCN-35
LENGTH (miles / km). 0.25/0.40
DESCRPT: SR I9/US 23 NBL @ WALNUT CREEK EAST EDGE OF MACON
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 333 I51- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
MACON TIP # MCN-35 ,
LENGTH (miles / km) 0.25 /0.40
DESCRPT: SR 19/US 23 SBL @ WALNUT CREEK EAST EDGE OF MACON
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 333 I52- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
MACON TIP # MCN-38
LENGTH (miles / km) 0.24 /0.39
DESCRPT: SR 87/US 23 @ BEAVERDAM CREEK JUST NORTH OF 1-75
PE: 2001 . ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT:, 342080-. ,TYPE WORK: WIDENING
FUND: STP
MACON TIP # MCN-36
LENGTH (miles / km) 0.86/1.38
DESCRPT: JEFFERSON'LE FM WALNUT CK-RECREATION & MILLER'LD TO BRISTOL
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 351095-
PE: 1995 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY . $1,347,000
$2,268,000 $1,814,400
$453,600
PROJECT: 350520~ ,TYPE WORK: WIDENING
FUND: STP
MACON TIP # MCN-22
LENGTH (miles / km) 0.64 /1.03
DESCRPT: FOREST HILL RD IN MACON FROM FORSYTH ROAD TO WIMBISH ROAD
EXIST, LANES: 02 PROPOSED LANES: 04
PE: 1984 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$2,510,000 $2,008,000
$502,000
Page 42 of336
<lJ'
._~.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
~.......
_
.. - ------~---......-._-_,
BIBB COUNTY
PROJECT: 350960- TYPE WORK: TURN LANES
FUND: STP
MACON TIP # MCN-40
LENGTH (miles / km) 1.3 /2.09
DESCRPT: SR 74 FMW OF 1-475 W/TRN LNES TO EOF LOG CABIN DRiSR 74 SP
PE: 1994 ROW: 1997 CST: 2002 FED Share: GA Shure:
UNDERWAY UNDERWAY $4,040,000 $3,232,000
$808,000
PROJECT: 351080- TYPE WORK: WIDENING
FUND: STP
MACON TIP # MCN-28
LENGTH (miles / km) 1.2/1.93
DESCRPT: JEFFERSONVILLE RD FM RECREATION RD TO FALL LINE FWY/US 80
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 0000835
PE: 1996 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $1,566,000 . $2,500,000 $2,000,000
$500,000
PROJECT: 351090- TYPE WORK: WIDENING
FUND: STP
MACON TIP # MCN-24
LENGTH (miles / km) 0.85/1.37
DESCRPT: JEFFERSONVILLE RD FM EMERY HWYISR 19 TO WALNUT CREEK BRIDGE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 342080-
-,
PE: 1996 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $2,618,000 $1,535,000 $1,228,000 $307,000
PROJECT: 351095- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
MACON TIP # MCN-55
LENGTH (miles / km) 0.22 /0.35
ROW: NONE
DESCRPT: CR 727/JEFFERSONVILLE RD. @ WALNUT CREEK IN NE MACON
CST: 2003
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 342080-
GA Share:
UNDERWAY
$1,235,000 $988;000 $247,000
.,~.....'-.
PROJECT: 351100- TYPE WORK: WIDENING
FUND: STP
PE: 1995
MACON TIP # MCN-26
LENGTH (miles / km) 0.9/1.45
ROW: 2001
DESCRPT: CR 88/LOG CABIN DR FM SR 74/MERCER UNIV DR TO HOLLINGSWORTH
CST: 2003
EXI~T. LANES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 351105-
GA Share:
UNDERWAY $3,865,000 $3,682,000 $2,945,600
$736,400
PROJECT: 351105- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
PE: 1995
MACON TIP # MCN-56
LENGTH.(mi/es / km) 0.22/0.35
ROW: LOCL
DESCRPT: CR 88ILOG CABIN DRIVE @ ROCKY CREEK WEST OF SR 74
CST: 2003
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 351100-
GA Share:
UNDERWAY
$1,549,000 $1,239,200
$309,800
PROJECT: 351 I 10- TYPE WOI/K: WIDENING
FUND: STP
MACON TIP # MCN-30
LENGTH (miles / km} 0.64 /1.03
DESCRPT: LOG CABIN DR FM EISENHOWER PKWY TO MERCER UNIV DRI SR 74
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $1,316,000 $1,591,000 $1,272,800 $318,200
r >.
L~:
PROJECT: 351120- TYPE WORK: WIDENING
FUND: STP
MACON TIP # MCN-31
LENGTH (miles / km) 2.04/3.28
DESCRPT: BLOOMFIELD RDILOG CABIN DR FM ROCKY CK RD TO SR 22/EISENHOWE
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 2002 CST:
UNDERWAY $2,429,000 AFTER 2003
Page 43 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
- - - - , - - - - - - _ .. -_._"~_
.... ..~_,_.
9/21/00
-----
BIBB COUNTY
PROJ~CT: 351140- TYPE WORK: WIDENING
MACON TIP # MCN~29
LENGTH (miles / km)
FUND: STP 2. I /3.38
DESCRPT: NW PK WY-NEW LOC FM LOG CABIN TO NAPIER@PARK ST THEN TO SR 19
. EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1996 ROW: 2002 CST:
UNDERWAY $3.286,000 AFTER 2003
PROJECT: 351150- TYPE WORK: WIDENING
FUND: STP
MACON TIP # MCN-27
LENGTH (miles / km) 0.99/1.59
DESCRPT: CR 79INORTHSIDE DR FM WESLEY AN DR TO FOREST HILL RD/CR 723
EXIST. LANES: 02 PRO~OSED LANES: 04
PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$2,637.000 $2,109,600
$527,400
PROJECT: 362695- TYPE WORK: NEW CONSTRUCTION
FUND: NHS
MACON TIP # MCN-49
LENGTH (miles / km) 1.7412.80
DESCRPT: SR 540/EISENHOWER PKWY FM 1-16 N TO SR 19IUS'80/EMERY HWY
EXIST. LANES: 00 PROPOSED LANES: 04
'I
ASSOCIATED PROJECTS: 36Y695-
PE: 1986 ROW: 2002 CST:
UNDERWAY $1,008,000 AFTER 2003
PROJECT: 363630- TYPE WORK: NEW CONSTRUCTION
FUND: NHS
MACON TIP # MCN-50
LENGTH (miles / km) 1.9/3.06
DESCRPT: SR 540IFALL LINE FWY FM LOWER BOUNDARY ST E TO 1-16
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 36Y630-
. PE: 1992 'ROW:2002
CST:
UNDERWAY $2,174,000 AFTER 2003
PROJECT: 371774- TYPE WORK: BICYCLE/PED.FACILITY
FUND:STP
PE:LOCL
MACON TIP # TEA- I
LENGTH (miles / km) 1/1.61
ROW: LOCL
L~
DESCRPT: OCMULGEE HERIT AGE GR~ENWAY IN MACON
CST: 2001
$1,000,000
FED Share:
$800,000
OTHShare:
PROJECT: 303102- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
MACON TIP #
LENGTH (miles / km) 0/0,00
ROW: NONE
DESCRPT: PURCHASE TRANSIT VEHICLES; BUS WASHER; REPLACE PAINT SHOP
CST: 2001
FED Share:
GA Share: .
OTH Share:
PROJECT: 303103- TYPE WORK: OPERATING
MACON TIP #
LENGTH (miles / km)
DESCRPT: OPERATING ASSISTANCE FOR FY 2001
FlIND: TRANSIT
PE: NONE
0/0.00
' ROW: NONE
CST: 2001
FED Share:
szoo.ooo
$63?,000 $564,000' $71,000
$71,000
$1,736,000 $813,000
PROJECT: 3D3104- TYPE WORK: CAPITAL
MACON TIP #
LENGTH (miles / km)
DESCRPT: PURCHASE BUSES; REPLACEMENT OF PAINT SHOP
~;
.~
kj
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTH Share:
$923,000
$761,000 $676,000
$85,000 $85,000
Page 44 of336
_______________.,..-__._h_. __ . STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
~,......
~~:
BIBB COUNTY
PROJECT: 303105- TYPE WORK: OPERATING
MACON TIP #
LENGTH (miles / km)
DESCRPT: FY-2002 OPERATING ASSISTANCE
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
OTHShare:
PROJECT: 303106- TYPE WORK: MACON TIP # DESCRPT: PURCHASE 6 BUSES
CAPITAL
LENGTH (miles / km)
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTHShare:
PROJECT: 303107- TYPE WORK: CAPITAL MACON TIP # DESCRPT: PURCHASE 6 BUSES
LENGTH (miles / km)
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTH Share:
PROJECT: 3V7036- TYPE WORK: CAPIT AL
MACON TIP #
LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
:- .
~_ ..
PROJECT: DNR252- TYPE WORK: BICYCLE/PED. FACILITY
FUND: REC TRAILS PE: NONE
MACON TIP # DNR- I
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: DNR RECREATIONAL TRAILS PROG - CENTRAL CITY PARK TRAIL HEAD
CST: 2001
FED Share:
OTH Share:
PROJECT: DNR253- TYPE WORK: BICYCLE/PED. FACILITY
FUND: REC TRAILS PE: NONE
MACON TIP # DNR-2
LENGTH (miles r km)
0/0.00
ROW: NONE
DESCRPT: DNR REC TRAILS PROG - PIERCE AVENUE WATER WORKS TRAIL HEAD
CST: 200 I
FED Share:
PROJECT: M000352 TYPE WORK: SHOULDER WORK
MACON TIP #
LENGTH (miles / km)
DESCRPT: SR 74 FM MONROE CO LN TO MOSELEY DIXON RD
LUMP SUM PROJECT
FUND: STP 7.35/ I 1.83
OTH Share:
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
. _" _'
$1,771,000 $621,000
$1,150,000
$450,000 $400,000 $50,000
$50,000
$450,000 $400,000
$50,000 $50,000
$41,000 . $41,000
$11,000
$125,000 $100,000 $25,000
$125,000 $100,000
$25,000
$519,000 $415,200 $103,800
PROJECT: TOOOl37 TYPE WORK: CAPITAL
FUND: TRANSIT
PE: NONE
MACON TIP #
LENGTH (miles / km) 0/0.00
.'
DESCRPT: FY 2003 MACON SECTION 5307 CAPITAL
ROW: NONE CST: 2003 FED Share:
GA Share:
OTH Share:
$662,000 $588,000
$74,000 $74,000
Page 45 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
.-..""'>..._""""',., ....,..-~--.--_.,--_..._
9/21/00
.... .--"""''''"''''......,--~---..--,-------,_.._ . ~-------.~.- - - - - - -
BIBB COUNTY
PROJECT: T000138 TYPE WORK: CAPITAL
MACON TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 MACON SECTION 5309 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTHShare:
$450,000 $400,000
$50,000 $50,000
PROJECT: TOOOIJ9 TYPE WORK: OPERATING
MACON TIP # .
LENGTH (miles /km)
DESCRPT: FY 2003 MACON SECTION 5307 OPERATING
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
$1,806,000 $709,000
PROJECT: T000140 TYPE WORK: CAPITAL MACON TIP # DESCRPT: FY 2003 MACON SECTION 53 IO
LEi(VGTH (miles / km)
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$1,097,000
$46,000 $46,000 $11,000
PROJECT: TOOOl59 TYPE WORK: CAPITAL
MACON TIP #
LENGTH (miles / km)
DESCRPT: FY 2002 MACON SECTION 5310 CAPITAL
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$43,000 $43,000 $11,000
Page 46 of336
_ _ _ _ .......
STATE TRANSPORTATION IMPROVEMENT PROGRAM
4
9/21/00 . _ _ "I<~_"'
~~~
._,,_"""'"
BLECKLEY COUNTY
PROJECT: 0000123 TYPE WORK: LANDSCAPING LENGTH (miles I km)
DESCRPT: COCHRAN STREETS CAPE
FUND: STP 010.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 222360- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles I km) 2.5 14.03
DESCRPT: SR 87 FM NORTH OF SR 257 NW TO THE COCHRAN BYPASS
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 2001 CST: 2002
GA Share:
$55,000 $44,000
$11,000
UNDERWAY $1,867,000 $4,296,000
$4,296,000
PROJECT: 245336- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (mileslkm) 0.24/0.39
DESCRPT: SR 126 @ GUM SWAMP CREEK 5.8 MI E OF COCHRAN
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
,
"-.
:"; .
i~;~~;'
Page 47of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
,
-
-
-
-
-
-
-
-
.
.
.
.
.
.
-__.
_.<
_.
.
_.",.
.
.
.
.
~-
.
9/21/00
_--._.'"',._-~"'_
.
_~ . ._
_.__ ..~,...""'..-_,-..
_
-
-
-
BRANTLEY COUNTY
PROJECT: 533155- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.25 /0040
ROW: 2001
DESCRPT: SR 32/HARRELL HIGHWAY @BARBERS CREEK 2 MI E OF HORTENSE
CST: 2002
FED Share:
GA Share:
liNDERWAY $10,000
$794,000 $635,200 $158,800
PROJECT: 533156- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles 1 km) 0.21 10.34
ROW: 2001
DESCRPT: SR 32/HARRELL HIGHWAY @ MILL BRANCH 4 MI E OF HORTENSE
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$250,000 $200,000
$50,000
PROJECT: 533157- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
. PE: 1999
LENGTH (miles 1 km) 0.24/0.39
ROW: 2001
DESCRPT: SR 32/HARRELL HIGHWAY @ BROWNTOWN SWAMP 9 MI E OF H~RTENSE
CST: 2002
FED Share:
GA Share:
UNDERWAY . $10,000 $901,000 $720,800 $180,200
PROJECT: 533158- TYPE WORK: REPLACE BRIDGE LENGTH (mi/eslkm)
DESCRPT: SR 15 @ DIX BRANCH IN CITY LIMITS OF HOBOKEN
FUND: BRIDGE 0.21/0.34
PE: 2001 ROW: , CST:
'$20,000 AFTER 2003 AFTER 2003
PROJECT: 570926- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1998
LENGTH (mileslkm) 0.21/0.34
ROW: LOCL
DESCRPT: CR 191 @ SOUTH PRONG BIG CREEK 4.5 MI S OF HOBOKEN
CST: 2002
FED Shure:
GA Share:
UNDERWAY
'\ $605,000 $484,000 $121,000
. ~;;'
:;'.. .~
~:;i:
Page 48 of336
_ ._ __..."" ....,
- - - - - - - - - - - _.._ - - _ . -
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
,_ _,_ _ w _._""
_ _
_~..".,'"''''I>--...
._a ''''_..... ....' - , ~
BROOKS COUNTY
PROJECT: 0000079 TYPE WORK: LANDSCAPING
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: DOWNTOWN QUITMAN BEAUTIFICATION & PED SAFETY PLAN
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 431900- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles / km) 0.38/0.61
ROW: LOCL
DESCRPT: CR 305 @ NEGRO BRANCH APPROX 2 MILES WEST OF QUITMAN
CST: 2002
rso suo
GA Share:
$223,000 $178,000
$45,000
UNDERWAY
$1,076,000 $860,800 $215,200
'-.:..
~.(
<..
Page 49 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ - - - - - - - _ . _ - _ . _ - _..........
9/21/00
BRYAN COUNTY
PROJECT: 532602- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 0/0.00 DESCRPT: SR 144 PASSING LANES THROUGH FT STEWART /SEE LONG'-532600
PE:NONE ROW: NONE eST: NONE
ASSOCIATED PROJECTS: 532600-
Lt:'t" -"-:,'
Page 50 of336
_ _.,_"
STATE TRANSPORTATJ(iN IMPROVEMENT PROGRAM
.__
. . ._9._/21_/0..0
_""'''''_~w_,_._
"_~
.__.__
BULLOCH COUNTY
PROJECT: 0001076 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: MIN. GUARAN PE: 2001
LENGTH (miles / km) 0.46/0.74
ROW: LOCL
DESCRPT: SR 26/US 80 AT AKINS POND RD/CR 9 NORTH OF STATESBORO
CST:
$23,000 AITER 2003
PROJECT: 521270- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 1.4 /2.25
DESCRPT: SR 67 FM JUST S OF CR 248/585 NORTH TO 5-LN & @ OGEECHEE RR
EXIST. LANES: 02 PROPOSED LANES: 05
PE: 1992
ROW: 1997
CST: 2001
reo sno
GA Share:
UNDERWAY UNDERWAY $5,242,000 $4,193,600 $1,048,400
PROJECT: 522460- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 67 FM 1-16 TO STATESBORO BYP EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 10.9/17.48
PE:2002 ROW: CST:
$2,000,000 AITER 2003 AITER 2003
PROJECT: 522465- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
PE: 1992
LENGTH (miles / km) O. 12/ O. I9
ROW: 2001
DESCRPT: SR 67 @ WOODCOCK BRANCH & ZETTEROWER BRANCH
CST: 2001
FEDShllre:
GA,Share:
UNDERWAY $10,000
$2,405,000 $1,924,000
$481,000
PROJECT: 522640- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 6.85 / 11.03
DESCRPT: E. STATESBORO BYP/SR 1018 FROM SR 73/US 25 TO SR 73/US 301
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1997 ROW: 2002 CST:
UNDERWAY $460,000
AITER2003
PROJECT: 522650- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 4.917.89
DESCRPT: W.BYPASS/SR 67/US 25 FM SR 73/US 25 NW TO SR 26/US 80
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 2001 CST: 2001
GA Shure:
UNDERWAY $50,000
$4,400,000
$4,400,000
PROJECT: 542040- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: CR 927 @ MA~ BRANCH 9 MI S OF BROOKLET
FUND: BRIDGE
PE: 1998
0.2/0.32
ROW: LOCL
CST: 2001
FEDShllre:
GA Share:
UNDERWAY
$598,000 $478,400 $119,600
PROJECT: 542380- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 46 @ LOTTS CREEK 1.8 MI E OF REGISTER
FUND: BRIDGE
PE: 1999
0.27/0.43
ROW: 2001
CST: 2001
FED Share:
GA Share:
UNDERWAY $10,000
$1,486,000 $1,188,800
$297,200
Page 51 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
--------_._-_.__._--, --_. 9/21/00 _-_._---,--------
BURKE COUNTY
PROJECT: 222100- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 5.9/9.50
DESCRPT: SR 1211US 25 FM WAYNESBORO BYPASS @ CR 451 TO CR 438
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 22Y100-
PE: 1993 ROW: 2001 CST: 2001 FED Share: ,GA Share:
UNDERWAY , $1,210,000 $12,874,000 $10,299,200
$2,574,800
PROJECT: 222110- TYPE WORK: WIDENING
FUND:NHS
LENGTH (miles / km) 10 / 16.10
ro DESCRPT: SR 121IUS 25 FM CR 438/BURKE CO SR 88 IN RICHMOND CO
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 2221IX- 22YI10-
PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $6,468,000
$16,298,000 $13,038,400
$3,259,600
PROJECT: 222480- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 8.8 / 14., 7
DESCRPT: SR 121/US 25 SAVANNAH RIVER PKY FM CR 118/354 TO SR 24 @BYP
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 22Y480-
PE: 1993 ROW: 2003 CST:
UNDERWAY $2,526,000 AFTER 2003
PROJECT: 22255X- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 0/0.00
DESCRPT: SR I21IUS 25/SA VN RVR PKWY FM CR 16 TO CR 118/JENKINS-i22550
EXIST. LANES: 02 PROPOSEP LANES: 04
ASSOCIATED PROJECTS: 222550-
. ~':'
PROJECT:,231260- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km)5.63 /9.06
DESCRPT: SR 24 PASSING LNS @ 4 LOC BET WAYNESBORO&LOU'VILLEIJEFFERSON
EXIST. LANES: 02 PROPOSED LANES: 03
ASSOCIATED PROJECTS: 23I26X-
PE:NONE ROW: NONE CST: NONE
PE: 1997 ROW: 2002 CST:
UNDERWAY $100,000
AFTER 2003
\
~. . ~~:.:.:;;.
Page 51 of336
_ _ _ _~
STATE TRANSPORTATioN IMPROvEMENT PROGRAM
,
, ., 9/21/00
=..
w_._. .__, ._.
_._,,,~,""
_
BUTTS COUNTY
PROJECT: 0000149 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles / km)
DESCRPT: INDIAN SPRINGS HOTEL PHASE 2
FUND: STP
0/0,00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000523 TYPE WORK: INTERCHANGE LENGTH (miles / km)
DESCRPT: SR 16/ARTHUR BOLTON PKWY AT 1-75 EXIST. LANES: 02 PROPOSED LANES: 04
FUND: 1M 0.83 /1.34
OTHShare:
PE: 1997 ROW: 2003 CST:
$313,000 $250,000
$63,000
UNDERWAY $9,800,000 AFTER 2003
PROJECT: 33182X- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: SR 36 FM HIGH FALLS RD TO .lUST WEST OF 1-75;SEE LAMAR
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 331820-
PROJECT: 332360- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 3.74/6.02
DESCRPT: SR 42IUS 23 PPL @ MPI 0.60-11.881 MPI 1.88- I3.35[ MP 14.3-15.3
EXIST. LANES: 02 PROPOSED LANES: 03
ASSOCIATED PROJECTS: 33236X-
PROJECT: 332510- TYPE WORK: REPLACE BRIDGE
FUND: STP
LENGTH (miles / km) 0.9/1.45
DESCRPT: SR 16 OVER OCMULGEE RIVER AT JASPER CL(M.L. 17.45)
PE:NONE
ROW: NONE CST: NONE
PE: 1999 ROW: 2002 CST:
UNDERWAY $149,000
AFTER 2903
PE: 1997
ROW: 2001 CST:
UNDERWAY $89,000
AFTER 2003
PROJECT: 33252X- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 0 /0.00
DESCRPT: SR 16/ARTHUR BOLTON PKWY NR REHOBOTH RD TO 1-75/SEE 332520
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 332520-
PE:NONE
ROW: NONE CST: NONE
PROJECT: 333170- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.23 /0.37
DESCRPT: SR 36@TOWALIGA RIVER 7.5 MI SW OF JACKSON
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
l~:
PROJECT: 333172- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.28/0.45
DESCRPT: SR 36 @ SOUTH RIVER AT BUTTS-NEWTON CO LINE
ASSOCIATED PROJECTS: 33317X-
PH: 2001 ROW: CST:
$34,000 AFTER 2003 AFTER 2003
Page 53 of336
STATE TRANSpqRTAT!ON IMPROVEMENT PROGRAM
9/21/00
BUTTS COUNTY
PROJECT: 343450- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2001 .
LENGTH (miles I km) 0.27/0.43
ROW: LOCL
DESCRPT: CR 290/FINCHERVILLE ROAD @ TUSSAHA W CREEK 5 MI N OF JACKSON
CST: 2002
FED Share:
GA Share:
OTHShare:
PROJECT: M000542 TYPE WORK: SHOULDER WORK
FUND: NHS
LENGTH (miles/km) 21.7/34.99
DESCRPT: SR 40)/1-75 FM S OF SR )6/BUTTS TO S OF WALT STEPHENS/HENRY
L UMP SUM PROJECT
PE:NONE ROW: NONE CST: 200) FED Share: GA Share:
$28,000
$950,000 $760,000 $95,000 $95,000
$) 0,000,000 $8,000,000 $2,000,000
,;
Page 54 of336
STATE TRANSPORTATION IMPROvEMENT PROGRAM
9/21/00
CALHOUN COUNTY
PROJECT: 0000080 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles / km)
DESCRPT: ARLINGTON RR DEPOT REHAB
FUND:STP 0/0.00
PE:LoCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 442950- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 216 @ LITTLE PACHITLA CREEK 1 MI N OF EDISON
FUND: BRIDGE 0.22/0.35
PE: 1999 ROW: 2003 CST:
$104,000 $83,000
$21,000
UNDERWAY $10,000
AFTER 2003
v.
.
-,:"
t~T
Page 55 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
CAMDEN COUNTY
PROJECT: 0000067 TYPE WORK: LANDSCAPING . LENGTH (miles / km)
DESCRPT: KINGSLAND STREETSCAPE PHASE II
FUND: STP 0/0:00
PE: LOCL ROW: LOCL . CST: 2001 FED Share:
PROJECT: 0000069 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: WOODBINE WALKWAY AND RIVERWALK PHASE 2
FUND:STP 0/0.00
OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000070 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: ST. MARYS HISTORIC WATERFRONT PROJECT PHASE I
FUND:STP 0/0.00
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000689 TYPE WORK: REST AREA
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: RECONSTRUCTION OF THE 1-95NORTH BOUND WELCOME CENTER
OTH Share:
PE: 2001 ROW: 2003 CST:
$250,000 $200,000 $50,000
$250,000' $200,000
$50,000
$625,000 $500,000 $125,000 $200,000 $150,000 AFTER 2003
PROJECT: 511084- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 6.76 / 10.88
DESCRPT: 1-95 FM CR 138 TO US 17/GLYNN & BR@L SATILLA RIVER--51108X
EXIST. LANES: 04 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 51108X-
PE: 1994 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$25,806,000 $20,644,800
$5,161,200
PROJECT: 51141 X- TYPE WORK: REST AREA
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SAVANNAH & KINGSLAND WELCOME CNTRS ON 1-95/BATHROOMS/CHATHAM
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 511410-
PE:NONE ROW: NONE CST: NONE
PROJECT: 521910- . TYPE WORK: WIDENING
FUND: STP
LENGTH (mi/es/km) 3.3/5.31
DESCRPT: SR 40 FM KINGS 'BAY RD SE TO SR 40 SPUR AND SIDEWALKS
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 1998 CST: 2001 FED Share: GA Share: OTH Share:
PROJECT: 522690- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.1/0.16
DESCRPT: SR 25/US 17 BRIDGE OVER ST. MARY'S RIVER /FLA STATE LINE
PE: 1993 ROW: 2001 CST:
UNDERWAY UNDERWAY
$6,791,000 $5,432,800
$358,200 $1,000,000
UNDERWAY $5,000
AFTER 2003
Page 56 of336
-"--~,-----
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/0J
CAMDEN COUNTY
PROJECT: 571431- TYPE WORK: WATER POLLUTION MITIG.
FUND:STP
LENGTH (miles / km) 0/0.00
DESCRPT: WETLAND MITIGATION SITE NEAR WOODBINE WEST OF SR II O@SATILLA
LUMP SUM PROJECT
PE:NONE ROW: 2001 . CST: NONE
$700,000 .
,.
~,
l_,
Page 57 0/336
----_._--_.
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00
CANDLER COUlYTY
PROJECT: 0000071 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
PE: LOCL
..,
LENGTH (miles / km) 0 / 0.00
ROW: LOCL
DESCRPT: SIDEWALKS/BIKE LANES TO LINK COMMUNITY SERVICES IN METTER
CST: 2001
$250,000
FED Share:
$200,000
OTH Share:
PROJECT: 0000691 TYPE WORK: REST AREA
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: 1-16 CONSTRUCTION OF A NEW REST AREA IN MEDIAN AT MP 97
PE: 2001 ROW: NONE CST:
$50,000 $350,000 AFTER 2003
PROJECT: 542402- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 129@CANOOCHEE RIVER OfF 4 MI S OF METTER
FUND: BRIDGE
0.22 i 0.35
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
~-'':
L>
Page 58 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9121100
--------
CARROLL COUNTY
PROJECT: 0000110 TYPE WORK: LIGHTING LENGTH (miles / km)
DESCRPT: DOWNTOWN CARROLLTON STREETSCAPE
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$1,250,000 $1,000,000
PROJECT: 631300- TYPE U:ORK: WIDENING
FUND: STP
LENGTH (miles / km) 4.517.25
DESCRPT: SR 166 FM CR 828/141 TO 4-LN/CARROLLTON ..INCL BRIDGES
EXIST. LANES: 02 PROPOSED LANES: 04
OTH Share:
PE: 1992 ROW: 2003 CST:
$250,000
UNDERWAY $6,728,000 AFTER 2003
PROJECT: 631320- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 1.65 /2.66
DESCRPT: SR 16/US 27ALT FM SR 166 SE TO W OF STRIPLING CHAP RD/CR 24
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 2002 CST:
UNDERWAY $1,761,000 AFTER 2003
PROJECT: 631490- TYPE WORK: NEW CONSTRUCTION
FUND: STP
LENGTH (miles / km) 1.4 /2.25
DESCRPT: VILLA RICA BYP EXTEND W.FM PROPOSED SR 61 BYPASS TO SR 101
EXIST. LANES: 00 PROPOSED LANES: 02
r
ASSOCIATED PROJECTS: 662540-
PE: 2001 ROW: CST:
$134,000 AFTER 2003 AFTER 2003
PROJECT: 632865- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.86/1.38
DESCRPT: SR 61 AT SANDHILL-HICKORY LEVEL RD/CR 394 & OLD SR 61/CR 945
LUMP SUM PROJECT
PE: 1999 ROW: 2001 CST: 2001 FED Share: GA Share:
UNDERWAY $1,000
$309,000 $278,100
$30,900
PROJECT: 641910- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 100 NB MP 5.5-6.81 NB MP 13.3-14.551 SB MP 15.3-16.8 EXIST. LANES: 02 PROPOSED LANES: 03
FUND: STP 4.05 /6.52
PE: 1993 ROW: 2000 CST: 2002 FED Share: GA Share:
UNDERWAY UNDERWAY
$2,419,000 $1,935,200
$483,800
PROJECT: 642080- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles/km) 0.21/0.34
ROW: LOCL
DESCRPT: CR 834/SMITHFIELD ROAD @ INDIAN CREEK 4 MI NORTH OF BOWDON
CST: 2001
FED Share:
GA Share:
UNDERWAY
$375,000 $300,000 $75,000
PROJECT: 642090- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
UNDERWAY
LENGTH (miles / km) 0.21 /0.34
ROW: LOCL
DESCRPT: CR 523/JONES MILL ROAD @ SNAKE CREEK 1.5 MI N OF WHITESBURG
CST: 2001 FED Share:
$702,000 $561,600
GA Share:
$140,400
Page 59 of336
S
T
A
T
E
T
R
A
N
S
P
O
R
T
A
T
I
O
N
I
M
P
R
O
V
E.M
E
N
T
P
R
O ;
G ~
R
A
M
9/21/00
CARROLL COUNTY
PROJECT: 642310- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.3 /0.48
ROW: LOCL
DESCRPT: CR 829/CLEM-LOWELL RD @ WHOOPING CREEK SOUTH OF CARROLLTON
CST: 2002
FED Share:
GA Share:
UNDERWAY
$704,000 $563,200 $140,800
PROJECT: 64242X- TYPE WORK: NEW CONSTRUCTION
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: SR 997 FM PLEASANT RDG@HUTCHESON TO SR 8@CASHTOWN RlHARALSON
EXIST. LANES: 00 PROPOSED LANES: 02
ASSOCIATED PROJECTS: 642420-
PE:NONE ROW: NONE CST: NONE
PROJECT: 650620- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) . 1.1 / 1.77
DESCRPT: SR 16/CARROLLTON FM COLUMBIA RD TO SR I DRAINAGE IMPROVMENTS
PE: 2001 ROW: 2002 CST:
$100,000 $55,000
AFTER 2003
PROJECT: 662540- . TYPE WORK: NEW CONSTRUCTION
FUND: OTHER
,
LENGTH (miles / km) 1 /1.61
DESCRPT: SR 61 CONN FM N OF NS RR BRIDG.E @ DOUGLAS CL TO SR 61
EXIST. LANES: 00 PROPOSED LANES: 02
ASSOCIATED PROJECTS: 631490-
PE: 2001 ROW: CST:
$220,000 AFTER 2003 AFTER 2003
PROJECT: 811064- TYPE WORK: WEIGH STATION
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: 1-20: UPGRADE WB & NEW EB WEIGH STATIONS INCL SCALE REPL
ASSOCIATED PROJECTS: .. 81Y064-
PE: 1995 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $100,000
$9,900,000 $8,910;000
$990,000
Page 60 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
CATOOSA COUNTY
PROJECT: 611210- TYPE WORK: INTERCHANGE
CHATTANOOGA TMA TIP # GA-OI
LENGTH (mileslkm)
DESCRPT: 1-75 AT SR I 46/CLOUD SPRINGS ROAD
FUND:NHS 0.59/0.95
PE: 1999 ROW: 2001 CST:
UNDERWAY $5,000,000 AFTER 2003
PROJECT: 61131Z- TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles 1 km} 0/0.00
DESCRPT: I-59 @ 3 LOQI-24 @ 111-75 @ 4/WHITFIELD-SEE DADE-61131 O\XIZ
ASSOCIATED PROJECTS: 611310-
PE.NONE ROW: NONE CST: NONE
PROJECT: 621530- TYPE WORK: WIDENING
FUND: STP
CHATT ANOOGA TMA TIP # STP-98-2
LENGTH (miles 1 km)
2/3.22
DESCRPT: SR 151 FM ROLLINS IND PK/HOLCOMB RD TO US 41 @ RINGGOLD-&"Y"
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 62Y530-
PE: 1992 ROW: 2001 CST: 2003 FED Shure: GA Shure:
UNDERWAY $1,796,000 $2,405,000 $1,924,000 $481,000
PROJECT: 62Y530- TYPE WORK: WIDENING
FUND: 1M
CHATTANOOGA TMA TIP # STP-98-11
LENGTH (miles 1 km) 0/0.00
DESCRPT: SR 151 FM CR 179/666 TO US-41\SHOW IM$ FOR RAMPS/62 I 530
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 621530-
PE:NONE ROW: 2001 CST: 2003 FED Shure: GA Share:
$1,237,000 $3,469,000 $3,122,100
$346,900
PROJECT: 632885- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km}
DESCRPT: SR 3/US 41 @ TIGER CREEK 1.9 MI EAST OF RINGGOLD'
FUND: BRIDGE
PE: 2001
0.24 10.39
ROW: 2002
CST: 2003
FED Shure:
GA Share:
$20,000 $10,000 $593,000 $474,400 $118,600
PROJECT: 642210- TYPE WORK: WIDENING
CHATTANOOGA TMA TIP # STP-98(3)
LENGTH [miles 1 km)
DESCRPT: SR I46/CLOUD SPGS RD FM 1-75 NORTH TO SR 3/US 41
EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 0.59/0.95
PE: 1999 ROW: 2001 CST: 2003 FED Share: GA Shure:
UNDERWAY $314,000
$1,716,000 $1,372,800
$343,200
PROJECT: 642220- TYPE WORK: WIDENING
FUND: STP
CHATTANOOGATMA TIP# STP-98(4)
LENGTH (miles Ikm) 2.2/3.54
DESCRPT: SR 146 FM SR I/US 27 EASTWARD TO LAKEVIEW RD/CR 553
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2000 ROW: 2001 CST:
UNDERWAY $1,256,000 AFTER 2003
-,
PROJECT: 642230- TYPE WORK: WIDENING
FUND: STP
CHATTANOOGA TMA TIP # STP-98(5)
LENGTH (miles 1 km) 3.09/4.97
DESCRPT: CR'S 381-245 & 244 FM SR 3/US 41 NORTHWARD TO TENN STATE LIN
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2001 ROW: LOCL CST:
$48,000 AFTER 2003
Page 61 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. ------..-..-...- _----_ - 9/21/00
->-;_:.~--,-"",,,,----,,,-~,,,,,,<",,,<,,,,,",-,,,....--~.........,,.. ..._ - - _ . _ -
....
.
CATOOSA COUNTY
PROJECT: 642240- TYPE WORK: WIDENING
CHATTANOOGA TMA TIP # STP-98(6)
LENGTH (miles r km)
DESCRPT: SR 3/US 41 FM SR 15I NORTHWESTLY TO SR 146
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 631505-
FUND: STP 7.21 I 11.61
PE: 1999 ROW: 2003 CST:
UNDERWAY $1,200,000 AFTER 2003
PROJECT: 650430- TYPE WORK: WIDENING
FUND: STP
CHATTANOOGA TMA TIP # STP-99-1
LENGTH (miles I km) 1.45/2.33
DESCRPT: SR 3/US 41 FM SOUTH OF HIGHLAND RD/CR 40 TO FRAWLEY RDITENN
EXIST; LANES: 02 PROPOSED LANES: 04
PROJECT: 650440- TYPE WORK: WIDENING
FUND: STP
CHATTANOOGA TMA TIP # STP-99-2
LENGTH (miles ? km) 2.34/3.77
DESCRPT: SR I46/CLOUD SPGS RD FM LAKEVIEW DR TO 1-75 & BRIDGE &65Y440
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 65Y440-
PE: 1993 ROW: 1998 CST: 2003 FED Share:
ornsuo
PE: 1992 ROW: 2001 CST:
UNDERWAY UNDERWAY
$2,965,000 $2,106,000
. $859,000
UNDERWAY $3;074,000 AFTER 2003
PROJECT: 65Y440- TYPE WORK: WIDENING
FUND: STP
CHA TTANOOGA TMA TIP # STP-98-2
LENGTH (miles I km)
0 10.00
DESCRPT: SR I46/CLOljD SPGS RD FM LAKEVIEW DRTO I~751FOR Q23 $1650440
EXIST. LANES: 02 PROPOSED LANES: 05
ASSOCIATED PROJECTS: 650440-
PE: 1992 . ROW: 2001
CST: NONE
UNDERWAY $1,075,000
PROJECT: 670710- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
CHATTANOOGA TMA TIP # BRZ-98- i
LENGTH (miles I km) 0.5 10.8 I
PE: 1995 ROW: 2001
DESCRPT: CR 259 SOUTH OF RINGGOLD @ LITTLE CHICKAMAUGA CRK & RELOCATE
CST: 2001
FED Share:
GA Share:
UNDERWAY $220,000
$1,092,000 $873,600 $218,400
PROJECT: 671218- TYPE WORK: LANDSCAPING
FUND: STP
CHATTANOOGA TMA TIP #
LENGTH (miles I km) 0 10.00
DESCRPT: STREETSCAPES & SIDEWALKS IN THE CITY OF FORT OGLETHORPE
PE:LOCL ROW: LOCL CST: 2001 , FED Share:
OTHShare:
PROJECT: M000437 TYPE WORK: BRIDGES
FUND: NHS
LENGTH (miles I km) 0 10.00
DESCRPT: DECK REPLACEMENT/REHAB @ SEVERAL LOC IN CATOOSA COIPE ONLY
LUMP SUM PROJECT
PE:2001 ROW: NONE CST: NONE
$750,000 $600,000
$150,000 $40,000
PROJECT: M000438 TYPE WORK: RAMP
FUND: 1M
PE: 2001
$80,000
LENGTH (miles I km) 0/0.00
ROW: NONE
DESCRPT: SR 401/1-75 WEIGH STATION(SOUTHBOUND SIDE)
CST: 2001
$350,000
LUMP SUM PROJECT
FED Share: GA Share:
$280,000
D
$70,000
Page 62 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _ _ _ _ _ _ _ _ _ _ _ _ _~.
=
9/21/00 __..
0- _.
.~_
. CHARLTON COUNTY
PROJECT: 0000124 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles / km)
DESCRPT: FOLKSTON STREESCAPE; MUSEUM & WELCOME CENTER
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 522350- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / kin) 2.5 /4.03
DESCRPT: SR 40 EIFOLKSTONI MP 2.75/E OF CR 82/KENNISONS RD TO MP 5.0
EXIST. LANES: 02 PROPOSED LANES: 04
OTH Share:
PE: 1992 ROW: 2001 CST: 2001 FED Share: GA Share:
$118,000 $94,000
$24,000
UNDERWAY $100,000
$2,782,000 $2,225,600
$556,400
e. :-: .
..~v ':.
~~i'
Page 63 0/336
,-------------------------------------------~~--- -
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
CHATHAM COUNTY
PROJECT: 0000072 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
PE: LOCL ,
SAVANNAH TIP # 2000-H-17
LENGTH (miles / km) 0/0.00
ROW: LOCL
DESCRPT: TOM TRIPLETT COMMUNITY PARK TRAIL & OGEECHEE CANAL MASTER PL
CST: 2001
FED Share:
$500,000 $400,000
OTHShare:
PROJECT: 0000538 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
SAVANNAH TIP # 2000-H-18
LENGTH (miles / km)
0/0.00
DESCRPT: COASTAL GEORGIA GREENWAY-MULTI-USE TRAILS-9 COUNTIES
','
PE:LOCL ROW: LOCL CST: 2001 FED Share:
'OTH Share:
PROJECT: 0000539 TYPE WORK: BICYCLE/PED. FACILITY
SAVANNAH TIP # 2000-H-16
LENGTH (miles / km)
DESCRPT: GARDEN CITY BIKE LANE
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$100,000
$500,000 $400,000 $100,000,
$300,000 $240,000
OTHShare:
PROJECT: 0000676 TYPE WORK: NEW CONSTRUCTION
FUND: NHS
SAVANNAH TIP # 2001-H-03
LENGTH (miles / km) 0/0.00
DESCRPT: HS TRUMAN PKWY PH3 CT 2 - SKIDA WAY RD @ EISENHOWER DR
EXIST. LANES: 00 PROPOSED LANES: 04
PE: 1992 ROW: LOCL CST: 2001 FED Share: GA Share:
$60,000
UNDERWAY
$1,167,000 $933,600 $233,400
PROJECT: 0000690 TYPE WORK: REST AREA
FUND: 1M
SAVANNAH TIP # 2001-H-02
LENGTH (miles / km) 0/0.00
DESCRPT: RECONSTRUCTION OF THE 1-95 SOUTH BOUND WELCOME CENTER
PE: 2002 ROW: 2003 CST:
$200,000 $150,000 AFTER 2003
PROJECT: 511410- TYPE WORK: REST AREA
FUND: 1M
PE: 200 I
SAVANNAH TIP # 200 I-H-OI
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: SAVANNAH & KINGSLAND WELCOME CNTRS ON I-95/BATHROOMS/CAMDEN
CST: 2002
LUMP SUM PROJECT
FED Share:
ASSOCIATED PROJECTS: 51141X-
GA Share:
$35,000
$265,000 $238,500
$26,500
PROJECT: 521505- TYPE WORK: NEW CONSTRUCTION
FUND: HPP
PE: 1992
SAVANNAH TIP # 87-H-IO
LENGTH (miles / km) 1.9/3.06
ROW: LOCL
DESCRPT: HARRY S.TRUMAN PKY/PH IV FM WHITFIELD AVE TO MONTGOMERY X-RD
CST: 2002
EXIST. LANES: OO,YROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 52Y505-
GA Share:
UNDERWAY
$7,766,000 $6,212,800 $1,553,200
PROJECT: 521508- TYPE WORK: NEW CONSTRUCTION
FUND: NHS
PE: 1992
SAVANNAH TIP # 87-H-09
LENGTH (miles / km) 2.2/3.54
ROW: LOCL
DESCRPT: HARRY S.TRUMAN PKY/PH lIlA FM MONTGOMERY X-RD TO DERENNE AVE
CST: 2001
EXIST. LANES: 00 PROPOSED LANES: 04
, FED Share:
GA Share:
UNDERWAY
$22,540,000 $ I8,032,000
$4,508,000
Page 64 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
---- ----_. __ 9/21/00
------,-_._--,~--_.
._-,-
CHATHAM COUNTY
PROJECT: 521860- TYPE WORK: WIDENING
FUND: STP
SAVANNAH TIP # 90-H-6
LENGTH (miles / km) 3.69/5.94
DESCRPT: SR 25 FM 4-LN N/SR 204 NE TO SR 307 (lNCLD TWO BRDGES &BIKE)
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 1998 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$6,049,000 $4,839,200 $1,209,800
PROJECT: 52217X- TYPE WORK: WIDENING
FUND: STP
SAVANNAH TIP # 96-H-5
LENGTH (miles / km) 0/0.00
DESCRPT: SR 17/US 80 FM SR 17 TO CHERRY ST IN BLOOMINGDALE/EFFINGHAM
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 522170-
PE.'NONE ROW: NONE CST: NONE
PROJECT: 522490- TYPE WORK: WIDENING
FUND: HPP
SAVANNAH TIP # 93-H-03
LENGTH (miles I km) 5.77 /9.29
DESCRPT: SR 26IUS80 FM W OF BULL RIVER TO E OF LAZARETTO CRK & "Y"
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 52Y490-
PE: 1994 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $593,000
$2,735,000 $2,188,000
$547,000
PROJECT: 523230- TYPE WORK: ATMSIITS
FUND: NHS
SAVANNAH TIP # 2000-H-02
LENGTH (miles I km) 0 10.00
DESCRPT: ATMS: SAVANNAH/CHATHAM COUNTY/GDOT REGIONAL TCC
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$1,000,000 $800,000 $200,000
PROJECT: 523235- TYPE WORK: ATMS/ITS
SAVANNAH TIP # 2000-H-03
LENGTH (miles I km)
DESCRPT: ATMS: SAVANNAH SLO SCAN/CMS/RADAR
FUND: NHS 0/0.00
PE: NONE ROW: NONE CST: 2003 FED Share: GA Share:
$1,650,000 $1,320,000
$330,000
PROJECT: 52Y490- TYPE WORK: WIDENING
FUND: STP
SAVANNAH TIP # 93-H-3
LENGTH (miles I km) 5.16/8.31
DESCRPT: SR 26IUS80 FM W OF BULL RIVER TO E OF LAZARETTO qSEE 522490
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 522490-
PE: 1994 ROW: NONE CST: 2003 FED Share: GA Share:
UNDERWAY
$35,414,000 $28,331,200
$7,082,800
PROJECT: 52Y505- TYPE WORK: NEW CONSTRUCTION
FUND: NHS
SAVANNAHTIP#87-H-IO
LENGTH (miles Zkm) 1.9/3.06
DESCRPT: HARRY S,TRUMAN PKY/PH IV FM WHITFIELD TO MONTOGMERY--Q05 $
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 521505-
PE: 1992 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$2,318,000 $1,854,400
$463,600
~~ ~
l:;:
PROJECT: 532570- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
SAVANNAH TIP # 93-H-12
LENGTH (miles I km) 0.12 10.19
DESCRPT:ABERCO~ST @ TIBETAVE
PE: 1995 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$767,000 $613,600 $153,400
Page 65 of336
_ , _ _._,_.~
STATE TRANSPORTATION IMPROVEMENT PROGRAM
--.re_.__. __ __ 9/21/00
>o:,.....-.._._. .._ '...
~_.
._,_t""_"" _ _
__
~";"'''''''_''''
CHATHAM COUNTY
PROJECT: 532750- TYPE WORK: TURN LANES
FUND: STP
SAVANNAH TIP # 97-H-OI
LENGTH (miles / km) 0.3 I /0.50
DESCRPT:. SR 204/ABERCORN ST. @ EGRESS LN/OGLETI-IORPE MALL IN SAVANNAH
PE: 1998 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$750,000 $675,000
$75,000
PROJECT: 532760- TYPE WORK: TURN LANES
SAVANNAH TIP # 97-H-02
, LENGTH (miles / km)
DESCRPT: SR 2041ABERCORN ST. @ DERENNE ,AVE IN SAVANNAH
FUND:STP 0.2/0.32
PE: 1998 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$174,000 $156,600
$17,400
PROJECT: 532770- TYPE WORK: TURN LANES
SAVANNAH TIP # 97-H-03
LENGTH (miles / km)
DESC.RPT: SR 204/ABERCORN ST. @APACHEAVE IN S.AVAN' NAH
FUND:STP 0.47/0.76
PE:1998
ROW: LOCL
, CST: 2002
FED Share:
GA Share:
UNDERWAY
$234,000. $21Q,600
$23,400
PROJECT: 532780- TYPE WORK: TURN LANES
SAVANNAH TIP # 97-H-04
LENGTH (miles / km}
DESCRPT: SR 2041ABERCORN ST. @ LARGO DRIVE IN SAVANNA,H
FUND:STP 0.41/0.66
PE: 1998 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$277,000 $249,300 $27,700
PROJECT: 533070- TYPE WORK: REPLACE BRIDGE
FUND: STP
SAVANNAH TIP # 2000-H-06
LENGTH (miles / km) 0.2 /0.32
DESCRPT: SR 26NICTORY DRIVE OVER PLACENTIA CANAL IN THUNDERBOLT.
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$451,000 $360,800
$90,200
PROJECT: 533 I 60- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
SAVANNAH TIP # 2001-H-04
LENGTH (miles / km) 0,23/0.37
PESCRPT: SR 25/0CEAN HIGHWAY @ CSX RAILROAD 5 MI N OF SAVANNAH
PE: 2001 ROW: CST:
.' $20,000 AFTER 2003 AFTER 2003
PROJECT: 533200- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
SAVANNAH TIP # 2000-H-14
LENGTH (miles / km) 0.2 /0.32
DESCRPT: SR 204/ABERCORN EXTENSION @ HARMON CANAL N OF WHITE BLUFF
PE: 2003 ROW: CST:
$35,000 AFTER 2003 AFTER 2003
,'.
L
PROJECT: 533205- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
SAVANNAH TIP # 2000-H- I 5
LENGTH (miles / km) 0.22 /0.35
DESCRPT: CR 302/MONTGOMERY CROSS RD @CASEY CANAL I MI E OF SR 204
PE: 2003 ROW: LOCL CST:
$20,000 AFTER 2003
Page 66 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
...._-_._.""-------_._......_-,_.""'-,-'- - - 9/21/00
CHATHAM COUNTY
PROJECT: 550550- TYPE WORK: WIDENING
FUND: STP
SAVANNAH TIP # 92-H-03
LENGTH (miles / km) 3.2/5.15
DESCRPT: SR 204 SPURJDIAMOND CSWY FM FERGUSON AVE TO MCWHORTER RD
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $1,810,000
$26,071,000 $20,856,800 $5,214,200
PROJECT: 550575- TYPE WORK: REALIGNMENT
FUND: STP
SAVANNAH TIP # 2000-H-05
LENGTH (miles I km) 1.32/2.13
DESCRPT: PERIMETER RD RELOCATIO,N (PHASE I OF MONTGOMERY X WIDENING)
PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$846,000 $676,800 $169,200
PROJECT: 562165- TYPE WORK: WIDENING
SAVANNAH TIP # 99-H-04
LENGTH (miles / km)
DESCRPT: SR 307/DEAN FOREST ROAD FM R.B. MILLER RD TO SR 21
EXIST. LANES: 04 PROPOSED LANES: 05
FUND: STATE I /1.6 I
PE:NONE ROW: 2002 CST: 2003
GA Share:
$300,000 $600,000
$600,000
PROJECT: 571406- TYPE WORK: HISTORIC PRESERV AnON
SAVANNAH TIP # 99-H-5
LENGTH (miles / km)
DESCRPT: CENTRAL OF GA RAILROAD BUILDINGS IN SAVANNAH
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 505033- TYPE WORK: CAPITAL
SAVANNAH TIP #
LENGTH (miles / km)
DESCRPT: CAPITAL MAINT. ITEMS; OFFICE EQUIP.; FACILITY MOD.
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Sit are:
GA Share:
OTH Share:
PROJECT: 505034- TYPE WORK: OPERATING
SAVANNAH TIP #
LENGTH (miles / km)
DESCRPT: TRANSIT OPERA TING ASSISTANCE FOR FY 200 I
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
PROJECT: 505035- TYPE WORK: CAPITAL
SAVANNAH TIP #
LENGTH (miles / km)
DESCRPT: BUSES AND FACILITIES
PROJECT: 505037- TYPE WORK: CAPITAL SAVANNAH TIP # DESCRPT: BUSES AND FACILITIES
LENGTH (miles / km)
OTHShare:
FUND: TRANSIT
PE: NONE
. 0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTHShare:
FUND: TRANSIT
PE: NONE
010.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTHShare:
$187,000 $150,000
$37,000
$505,000 $449,000
$56,000 $56,000
$8,273,000 $1,404,000 $6,869,000
$4,050,000 $3,600,000
$450,000 $450,000
$4,050,000 $3,600,000
$450,000 $450,000
Page 670/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
,-------.-...~-------""'
CHATHAM COUNTY
PROJECT: 505038- TYPE WORK: CAP~TAL
FUND: TRANSIT
PE:NONE
SAVANNAH TIP #
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: CAPITAL MAINTENANCE ITEMS; OFFICE EQUIP.; FACILITY MOD.;
CST: 2002
FED Share:
GA Share:
OTH Share:
$738,000 $656,000.
$82,000 $82,000
PROJECT: 505039- TYPE WORK: OPERATING
.SAVANNAH TIP #
LENGTH (miles / km)
DESCRPT: TRANSIT OPERATING ASSISTANCE FOR FY 2002
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
$8,438,000 $1,400,000
. PROJECT: 5V7023- TYPE WORK: CAPITAL
.SAVANNAH TIP #
LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
,.
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$7,038,000
$59,000 $59,000 $15,000
PROJECT: TOOOl61 TYPE WORK: CAPITAL
SAVANNAH TIP #
LENGTH(miles / km) .
DESCRPT: FY 2002 SAVANNAH SECTION 5310 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE.
CST: 2002
FED Share:
GA Share:
$62,000 $62,000 $16,000
PROJECT: TOOOI74 TYPE WORK: CAPITAL
SAVANNAH TIP #
LE,NGTH (miles / km)
DESCRPT: FY 2003 SAVANNAH SECTION 5309 CAPITAL
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share;'
GA Share:
OTH Share:
PROJECT: TOOOI77 TYPE WORK: CAPITAL
SAVANNAH TIP #
LENGTHJt;niles / km)
DESCRPT: FY 2003 SAVANNAH SECTION 5307 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
PROJECT: TOOOl78 TYPE WORK: CAPIT AL
SAVANNAH TIP #
. LENGTH (miles/ km) -
D.ESCRPT: FY 2003 SAVANNAH SECTION 5310 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$4,050,000 $3,600,000
$450,000 $450,000
$603,000 $536,000
$67,000 $67,000
$65,000 $65,000 $16,000
PROJECT: TOOOI94 TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
SAVANNAH TIP #
. LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: FY 2003 SAVANNAH SECTION 5307 CAPITAL
CST: 2003
$8,443,000
$". ~.
FED Share:
$1,400,000
'.
~-..:;)
OTH Shure:
$7,043,000
Page 68 of336
S TATE TRANSPORTATION IMPROVE"MENT PROGRAM
9/21/00
CHATHAM COUNTY
PROJECT: 1'000195 TYPE WORK: OPERATING
SAVANNAH TIP #
LENGTH (miles I km}
DESCRPT: FY 2001 SAVANNAH SECTION 3037 OPERATING
PROJECT: 1'000196 TYPE WORK: OPERATING
SAVANNAH TIP #
LENGTH (miles I km)
DESCRPT: FY 2002 SAVANNAH SECTION 3037 OPERATING
PROJECT: 1'000197 TYPE WORK: OPERATING
SAVANNAH TIP #
LENGTH (miles I km)
DESCRPT: FY 2003 SAVANNAH SECTION 3037 OPERATING
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW.- NONE
CST: 2002
FED Share:
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
OTHShare:
$1,500,000 $750,000 $750,000
$1,500,000 $750,000 $750,000
$1,500,000 $750,000 $750,000
.....;. ....
~.
Page 69 0/336
......-
' _.1....
STATE TRANSPORTATION IMPROVEMENT PROGRAM
, _ _._._ _
9/21/00 .
-
._"
_ _ "'1
. _ " ' . " " _ : _... _ - . . . .
CHATTAHOOCHEE COUNTY
PROJECT: 32216X- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 0/0.00 DESCRPT:. SR 1 FM CR 43/STEWART TO US 280/SEE STEWART CO- 322160
EXIST. LANES: 02 PROPOSED LANES: 04
ASSQCIATED PROJECTS: 322160-
PE:NONE ROW: NONE CST: NONE
~~ .
~:
Page 70 of336
_ - - - - - - - - - - - - - - - - - - , '--.,-_.. .. _--------------_._---
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
CHATTOOGA COUNTY
PROJECT: 0000 III TYPE WORK: HISTORIC PRESERVATION
FUND: STP
PE: LOCL
LENGTH (miles I km) 0 10.00
ROW: LOCL
DESCRPT: SUMMERVILLE-DOWDY PK TURNTABLE/DEPOT RESTORATION/PED WALKWY CST: 2001
FED Share:
OTH Share:
PROJECT: 0000677 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.2 10.32
DESCRPT: CR 87/PEACH ORCHARD ROAD @ ALPINE CREEK I MI SE OF MENLO
PE: 2001 ROW: LOCL CST:
$319,000 $255,000
$64,000 $21,000
AFTER 2003
PROJECT: 0000678 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
. LENGTH (miles I km) 0.2 10.32
DESCRPT: CR 318/HAIR LAKE ROAD @ CHELSEA CREEK 5 MI NE OF MENLO
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 0000679 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (mileslkm) 0.21/0,34
DESCRPT: CR 322/0LD HIGHWAY 337 @ CHELSEA CREEK 3.2 MI NE OF MENLO
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 0000846 TYPE WORK: REPLACE BRIDGE
FUND: FOREST HWY PE: 2001
LENGTH (miles I km) 0.2/0.32
ROW: NONE
DESCRPT: CR 325/FH 12/HAMMOND GAP ROAD @ RUFF CREEK NW OF SUBLIGNA
CST: 2003
FED Share:
$25,000
$159,000 $159,000
PROJECT: 621082- TYPE WORK: WIDENING
FUND: STATE
LENGTH (mileslkm) 8 I 12.88
DESCRPT: SR I/US27/SUMMERV'LE BYP FM CR 329 TO N OF CR325 @ SR I/US27
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 62Y082-
PE: 1993 ROW: 2001 CST:
UNDERWAY $2,180,000 AFTER 2003
PROJECT: 621610- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles I km) 11.7 I 18.84 .
DESCRPT: SR IIUS 27 FM CR 331 rrRION TO LAFA YETTE BYP & WALKER CO
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 62161X-
PE: 1992 ROW: 2001 CST:
UNDERWAY $5,861,000 AFTER 2003
~
t.e:
PROJECT: 642470- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles I km) 0.22/0.35
ROW: LOCL
DESCRPT: CR 332/BACK BERRYTON ROAD @RACCOON CREEK CENTER OF BERRYTON
CST: 2002
FED Share:
OTH Share:
UNDERWAY
$700,000 $560,000
$140,000
Page 71 of336
r--====================-=-:_-. :- -:_:.=. _=-=_=.=_=-=-=-=-=================~'----STATE TRANSPORTATI0{V IMPROVEMENT PROGRAM
.............. .-.
"....".,,"""""" "
,.-oQllI"'""""""..,.."""'''' _ _~_ _'
9/21/00 M
'_.
, _ ._ _...
_
CHEROKEE COUNTY
PROJECT: 0000135 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # CH AR BP041
LENGTH (miles / km)
DESCRPT: ETOWAH RIVER GREENWAYIBIKE-PED PATH'
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$900,000 $720,000
PROJECT: 0000615 TYPE WORK: SIDEWALKS
ATLANT A TMA TIP # CH AR BP032
LENGTH (miles / km)
DESCRPT: SR 20 SIDEWALKS FM 1-575 TO CHAMBLEE LANE
OTH Share:
FUND: CMAQ
PE: LOCL
0/0.00
ROW: LOCL
CST: 2002
FED Share:
$180,000
$164,000 $131,000
PROJECT: 0000616 TYPE WORK: BICYCLE/PED. FACILITY
ATLANT A TMA TIP # CH AR BP039
LENGTH (miles / km)
DESCRPT: OAKDALE RD BIKE/PED FN SR 20 TO HA YNES ROAD
OTH Share:
FUND: CMAQ 0/0.00
PE: LOCL 'ROW: LOCL
CST: 2002 FED Share:
$33,000
$60,000 $48,000
PROJECT: 0000617 TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # CH AR BP040
LENGTH (miles / km)
DESCRPT: DOWNTOWN CANTON STREETSCAPE & SIDEWALKS
OTH Share:
FUND: CMAQ
PE: LOCL
0/0.00
ROW: LOCL
CST: 2001
FED Share:
$12,000
$1,265,000 $1,012,000
OTH Share:
PROJECT: 610740- TYPE WORK: ATLANTA TMA TIP # CH AR 108 DESCRPT: 1-75 @ SR 92
INTERCHANGE LENGTH (miles / km)
FUND:NHS 0.65 /1.05
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:
$253,000
UNDERWAY , $2,580,000
$4,885,000 $3,908,000
$977,000
PROJECT: 611250- TYPE WORK: TURN LANES
FUND: NHS
ATLANTA TMA TIP # CH AR 229
LENGTH (miles / km) 1.21/ 1.95
DESCRPT: 1-575 AUXILIARY LANES BETWEEN SR 92 AND TOWNE LAKE PARKWAY
PE:2001 ROW: 2003 CST:
.$80,000 $25,000 AFTER 2003
PROJECT: 611260- TYPE WORK: TURN LANES
ATLANT A TMA TIP # CH AR 230
LENGTH (miles / km)
DESCRPT: 1-575 AUX LANES BETWEEN SR 20 AND SR 5 BUSINESS
FUND:NHS 0.28 /0.45
PE: 2001 ROW: NONE CST: 2003 FED Share: GA Share:
$25,000
$1,000,000 $800,000 $200,000
PROJECT: 611270- TYPE WORK:. INTERCHANGE
ATLANTA TMA TIP # CH AR 231
LENGTH (miles / km)
DESCRPT: 1-575 AT SR 20 -INTERCHANGE RECONSTRUCTION
FUND:NHS 0.28 /0.45
PE:2001
ROW: 2002
,.
CST: 2003
FED Share:
GA Share:
$75,000 $500,000 $2,000,000 $1,600,000 . $400,000
Page 72 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. 9/21/00
,------~----_~--- -~------
CHEROKEE COUNTY
PROJECT: 620920- TYPE WORK: WIDENING
FUND: NHS
ATLANTA TMA TIP # CH 003
LENGTH (miles 1 km) 2.83/4.56
DESCRPT: SR 92 FM W OF WADE GREEN ROAD EASTERLY TO CHEROKEE TRAIL
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 1999 CST: 2003 FED Share: GA Share:
UNDERWAY UNDERWAY $8,793,000 $7,034,400 $1,758,600
PROJECT: 620940- TYPE WORK: WIDENING
ATLANTA TMA TIP # CH 004
LENGTH (miles 1 km)
DESCRPT: SR 92 FM 1-75 TO WADE GREEN ROAD
EXIST. LANES: 02 PROPOSED LANES: 04
FUND: NHS 4.5/7.25
PE: 1995 ROW: 2001 CST:
UNDERWAY $6,450,000 AFTER 2003
PROJECT: 630975- TYPE WORK: WIDENING
FUND: BRIDGE
PE: 1993
ATLANTA TMA TIP # CH 0 18
LENGTH (miles 1 km) 0.63 11.0 I
ROW: LOCL
DESCRPT: CR 770/BELLS FERRY RD FM NO VICTORIA TO.2 MI N/LITTLE RVR
'CST: 2003
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
GA Share:
UNDERWAY
$5,260,000 $4,208,000 $1,052,000
PROJECT: 631210- TYPE WORK: REALIGNMENT
FUND: STP
ATLANTA TMA TIP# CH 187
LENGTH (mileslkm) 5.23/8.42
DESCRPT: CR 772/KELLOG CRK RD FM SR 92 TO BELLS FERRY RD
PE: 2002 ROW: LOCL CST:
$197,000 AFTER 2003
PROJECT: 632790- TYPE WORK: PASSING LANES
FUND: MIN. GUARAN PE: 1999
ATLANTA TMA TIP # CH 182
LENGTH (miles 1 km) 4.917.89
ROW: 2001
DESCRPT: SR 20 3 TRUCK CLIMBING LANES AND INT IMP FM 1-575 TO CR 238
CST: 2002
FED Share:
GA Share:
UNDERWAY $4,374,000 $5,826,000 $4,660,800 $1,165,200
PROJECT: 632840- TYPE WORK: TURN LANES
FUND: STP
ATLANTA TMA TIP # CH 197
LENGTH (miles 1 km) 1.7 12.74
DESCRPT: SR 140 FM ARNOLD MILL RD/CR 777 TO MOUNTAIN RD/CR 311
PE: 1999 ROW: 2003 CST: 2003 FED Share: GA Share:
UNDERWAY $115,000
$1,965,000 $1,572,000
$393,000
PROJECT: 632845- TYPE WORK: TURN LANES
ATLANTA TMA TIP # CH 196
LENGTH (miles 1 km)
DESCRPT: SR 140 @ SUGAR PIKE RD/CR 296
FUND: STP 0.2 10.32
PE: 1999 ROW: 2003 CST: 2003 FED Share: GA Share:
UNDERWAY $20,000
$246,000 $196,800
$49,200
~
.;....
~.s>
PROJECT: 632850- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # CH 195
LENGTH (miles / km) 0.2 10.32
DESCRPT: SR 140@HICKORY ROADICR 778 & BATESVILLE ROAD/CR 298
PE: 1999 ROW: 2003 CST: 2003 FED Share: GA Share:
UNDERWAY $26,000
$217,000 $173,600
$43,400
Page 73 of336
_ _,
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. . . ~.$
... , _.. , . . .
9/21/00
.._ _ _ _:... ,._~>;''''''',_.:'1
~
....''''_._ _ ... ."............... ~
,..,_,,_~_'''''<
<.
CHEROKEE COUNTY
PROJECT: 632855- TYPE WORK: TURN LANES
FUND: STP
ATLANTA TMA TIP # CH 194
LENGTH (miles I km) 0.4 10.64
DESCRPT: SR 140 AT MAULDIN ROAD/CR 323 AND UNIVETER ROAD/CR 309
PE: 1999 ROW: 2003 CST: 2003 FED Share: GA Share:
UNDERWAY $47,000
$310,000 $248,000
$62,000
PROJECT: 632860- TYPE WORK: TURN LANES.
ATLANTA TMA TIP # CH 198
LENGTH (miles I km)
DESCRPT: SR 140 AT SCOTT ROAD/CR 288
FUND: STP 0.2 10.32
PE: 1999 ROW: 2003 CST: 2003 FED Share: GA Share:
UNDERWAY $21,000
$258,000 $206,400 $51,600
PROJECT: 642485- TYPE WORK: . INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # CH 200
LENGTH (miles I km) 0.2 10.32
DESCRPT: SR 140; REALIGN HOSPITAL RD & SHOAL CK RD IN CITY OF CANTON
PE: LOCL ROW: 2001 CST: 2001 FED Share:
OTH Share:
PROJECT: 642490- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # CH AR BP035
LENGTH (miles I km) 1.5/2.42
DESCRPT: SR 5 BUS MULT-USE TRAIL FM JUNIPER ST TO BOLING PK IN CANTON
PE:LOCL ROW: LOCL CST: 2001 . FED Share:
PROJECT: 642495- 'TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # CH AR BP021
LENGTH (miles I km)
0 10.00
DESCRPT: JOHN T PETIT MULTI-USE TRAIL &DRAINAGE;LN WIDENING IN CANTON
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 662610- TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # CH AR BPO18 .
LENGTH (miles I km)
DESCRPT: TOWNE LAKE PKWY/CR 416 FM 1~575 TO EAGLE DR
FUND: STP 0/0.00
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 662612- TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # CH AR BP020
LENGTH (miles I km)
DESCRPT: WADE GREEN RD FM HWY 92 TO COBB CO LINE
FUND: STP 0/0.00
OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 662614- TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # CH AR BPO15
LENGTH (miles I km)
DESCRPT: TOWNE LAKE PKWY FM BELLS FERRY RD TO EAGLE DR
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 . FED Share:
OTH Share:
$300,000 $565,000 $452,000 $113,000
$160,000 $128,000
,0
$32,000
$144,000 $115,000
$29,000
$185,000 $148,000
$37,000
$84,000 $67,000 $17,000
$173,000 $138,000
$35,000
Page 74 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
._._---- __ '--_.~,_. --- 9/21/00---------------_.,----
CHEROKEE COUNTY
PROJECT: 662615- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # CH AR BP037
LENGTH (miles I km) I.5 12.42
DESCRPT: SUNSET/IVY DRS FM MARIETTA TO MCCOLLUM IN CANTON
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$275,000 $220,000
PROJECT: 662616- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANT A TMA TIP # CH AR BP038
LENGTH (miles I km) 0.9 I 1.45
DESCRPT: MERIDAN ST IN CANTON: BIKE/PED LN W/L1GHTING & SIGNAGE
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$55,000
$150,000 $120,000
PROJECT: 662617- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # CH AR BP034
LENGTH (miles I km) 2 13.22
DESCRPT: MEDICAL DISTRICT IN CANTON:HOSP RD@SRI40tO HOSP DR@SR5BU
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$30,000
$800,000 $640,000 .
PROJECT: 662618- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # CH AR BP036
LENGTH (miles I km) 010.00
DESCRPT: PED BRIDGE FM W OF CANTON MILL LOFTS TO SR 5 BUS TO JUNIPER
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$160,000
$750,000 $600,000
OTH Share:
$150,000
" '.
PROJECT: 662620- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
PE: 1999
UNDERWAY
ATLANTATMATIP#CHI81
LENGTH (mileslkm) 3.67/5.91
ROW: LOCL
DESCRPT: OLD SR 5 FM WOODSTOCK CL TO HOLLY SPRINGS CL
CST: 2002
$2,500,000
FED Share:
$2,000,000
OTH Share:
PROJECT: 671951- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # CH 199
LENGTH (miles I km) 0.21 10.34
ROW: LOCL
DESCRPT: CR 107/HOWELL BRIDGE RD @ SHARP MTN CREEK SW OF BALL GROUND
CST: 2002
FED Share:
GA Share:
$500,000
UNDERWAY
$597,000 $477,600 $119,400
PROJECT: 6V7025- TYPE WORK: CAPITAL LENGTH (miles I km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE: NONE
010.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$17,000 $17,000 $4,000
PROJECT: 71364X- TYPE WORK: WIDENING
FUND:NHS
ATLANT A TMA TIP # AR 3 I8B
LENGTH (miles I km) 0 10.00
DESCRPT: 1-575 FM 1-75 NORTH TO SIXES ROAD/CHEROKEE-HOV- SEE COBB
EXIST. LANES: 04 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 713640-
,PE:NONE ROW: NONE CST: NONE
o
Page 75 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
__ _--"._:- _----,...,..-,- 9/21/00
"' ~_._--- ----_._~_._-------~,........,-""'-~ ... ~
'" ...... .
..
CHEROKEE COUNTY
PROJECT: 71409X TYPE WORK: ATMSIITS
FUND: CMAQ
A.TLANTA TMA TIP # AR 341
LENGTH (miles I km) 0 10.00
. DESCRPT: ATMS/I-575 COMM/SURV FM I751COBB TO SR 92.ICOBB-7I4090
I
PE:NONE
ROW: NONE
CST: NONE
ASSOCIATED PROJECTS: 714090
PROJECT: TOOOOOI TYPE WORK: CAPITAL
ATLANTA TMA TIP # CH 152D
LENGTH (miles I km)
DESCRPT: FY 2002 CHE~OKEE COUNTY SECTION 5310
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FEDS!zare:
GA Share:
$17,000 . $17,000
$4,000
PROJECT: T000020 TYPE WORK: CAPITAL
ATLANT A TMA TIP # CH 152D
LENGTH (miles I km)
DESCRPT: FY 2003 CHEROKEE COUNTY SECTION 5310
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
,
CST: 2003
FED Share:
GA Share:
$18,000 $18,000
$5,000
<{
~
[-:':.,:..:;'
Page 76 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
_~
j"_"l"'
=
"'''_''_'''-_~'_,
n _ _ ",,~
9/21/00
... _ < " "
_
CLARKE COUNTY
PROJECT: 0000159 TYPE WORK: SIDEWALKS
FUND: STP
PE:LOCL
ATHENS TIP #
LENGTH (miles I km) 0 10.00
ROW: LOCL
DESCRPT: ATHENS-CLARKE CO/WHITEHEAD & OGLETHORPE ELEMENTARYIPED IMP
CST: 2001
FED Share:
'PROJECT: 0000160 TYPE WORK: BICYCLE/PED. FACILITY
ATHENS TIP #
LENGTH (miles I km)
DESCRPT: ATHENS-CLARKE CO/RIVER BEND ROAD BIKE LANES
FUND: STP 010.00
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 0000161 TYPE WORK:, BICYCLE/PED. FACILITY
FUND: STP
ATHENS TIP #
LENGTH (miles I km) 0 10.00
DESCRPT: ATHENS-CLARKE CO/MULTI-USE BRIDGES OVER TRAIL & SANDY CREEKS
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000162 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATHENS TIP #
LENGTH (mileslkm) 0/0:00
DESCRPT: ATHENS-CLARKE CO/THE UNIVERSITY OF GEORGIA RIVER TRAIL PH II
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 122160- TYPE WORK: . WIDENING
FUND: STP
ATHENS TIP # 11-01(2)
LENGTH (miles I km) 4 16.44
DESCRPT: SR 15 ALT/US i 29 FM LAVENDER DR/CLARKE TO SR 330/JACKSON
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 12216X- .
OTH Share:
PE: 1992 ROW: 2001 CST: 2001 FED Share: GA Share:
$225,000 $180,000 $45,000
$303,000 $242,000
$61,000
$361,000 $289,000 $72,000
$365,OQO $292,000 $73,000 UNDERWAY $3,054,000 $8,950,000 $7,160,000 $1,790,000
PROJECT: 122600- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATHENS TIP # 11-04
LENGTH (miles I km) 0.5 10.81
DESCRPT: SR 10 LOOP/ATHENS PERIMETER AT US 78/LEXINGTON RD
EXIST. LANES: 00 PROPOSED LANES: 02
PE: 1994 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $495,000 $712,000 $569,600 $142,400
PROJECT: 122850- TYPE WORK: INTERCHANGE
FUND:NHS
ATHENS TIP # 11-09
LENGTH (mileslkm) 0.2/0.32
DESCRPT: SR 10 LOOP/ATHENS PERIMETER AT PETER ST/CS 306 & OLYMPIC DR
EXIST. LANES: 00 PROPOSED LANES: 02
PE: 1998 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $500,000
$10,500,000 $8,400,000 $2,100,000
{:
l;.:
PROJECT: 142200- TYPE WORK: INTERSECTION IMPROVEMENT
ATHENS TIP # 11-14
LENGTH (miles I km)
DESCRPT: WINTERVILLE RD/CR 470 AT NELLIE B. AVE/CR 141
FUND: STP 0.2 10.32
PE:2000 ROW: LOCL CST: 2001 FED Share:
OTH Share:
UNDERWAY
$355,000 $284,000
$71,000
, Page 77 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
---'...-----_._,--~
_ _ _",....- ..__. _.9_/.2_1/_ 00
_ _'
'""~
'_"__'_Il''"'_ _,
CLARKE COUNTY
PROJECT: 142205- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATHENS TIP # 11-15
.LENGTH [miles I km) 0.35 10.56
DESCRPT: WINTERVILLE RD/CR 470 AT INDIAN HILLS & SPRING VALLEY-REALGN
PE: 2000 ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 142210- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATHENS TIP # 11-16
LE,NGTH (miles! km) 0.28/0.45
DESCRPT: SPRING VALLEY RD/CR 140 AT ATHENA DR AND MOSS RD-REALIGNMENT
PE: 2000 ROW: LOCL CST: 2001 FED Share:
PROJECT: 142230- TYPE WORK: WIDENING
FUND: STP
ATHENS TIP # 11-02
LENGTH (mileslkm) 2.4 13.86
DESCRPT: OLD HULL RD/CR 127 FM NORTH AVE TO HULL RD/SR 72(EXCEPTION)
EXIST. LANES: 02 PROPOSED LANES: 03
OTHShare:
PE: 1999 ROW: LOCL CST: 2003 FED Share:
PROJECT: 142235- TYPE WORK: INTERSECTION IMPROVEMENT , FUND: STP
ATHENS TIP # 11- I9 I
LENGTH [miles I km) 0.25 10.40
DESCRPT: HAWTHORNE AVE/CR 811 AT OLD WEST BROAD STICR 938
OTHShare:
PE: 2000 ROW: LOCL CST: 2003 FED Share:
OTHShare:
PROJECT: 170522- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
ATHENSTIP#IV-05
. LENGTH(mileslkm) 0.47/0.76
ROW: LOCL
DESCRPT: CR 119/NO~HERE ROAD @ EAST SANDY CREEK 4 MI NORTH OF ATHENS
CST: 2001
FED Share:
OTHShare:
PROJECT: \D1071- TYPE WORK: CAPITAL
ATHENS TIP #
LENGTH (miles / km:
DESCRPT: TRANSIT VEHICLE
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTHShare:
PROJECT: \DI072- TYPE WORK: CAPITAL
ATHENS TIP # .
LENGTH (miles I km) .
DESCRPT: TRANSIT VEHICLES; MANINTENANCE AND EQUIP.
FUND: TRANSIT
PE: N01'!E
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTH Share:
PROJECT: \DI073- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
ATHENS TIP #
LENGTH(mileslkm) 0/0.00
ROW: NONE
DESCRPT: PUBLIC TRANSIT SERVICE IN ATHENS AND C;..ARKE COUNTY
CST: 2001
FED Share:
OTHShare:
_
UNDERWAY
$798,000 $638,000
$160,000 UNDERWAY
$354,000 $283,000
$71,000 UNDERWAY
$1,750,000 $1,400,000
$350,000 UNDERWAY
$420,000 $336,000
$84,000 UNDERWAY
$1,174,000 $939,000
$235,000
$450,000 $400,000
$50,000 $50,000
$411,000 . $365,000
$46,000 $46,000
$2,454,000 $455,000
$1,999,000
Page 78 of336.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_~_~_________
..c: ...~""""'_
9/21/00
.... ~ ..
_~l.1Il
CLARKE COUNTY
PROJECT: 1DI074- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
ATHENS Tip #
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: TRANSIT VEHICLE; MULTI-MODAL TRANSPORTATION CENTER
CST: 2002
FED Share:
GA Share:
OTH Share:
PROJECT: 1D1075- TYPE WORK: CAPITAL
ATHENS TIP #
LENGTH (miles / km)
DESCRPT: TRANSIT VEHICLES; MAINTENANCE AND EQUIP.
FUND: TRANSIT
PE:NONE
0/0.00.
ROW.' NONE
CST: 2002
FED Share:
GA Share:
OTH Share:
PROJECT: 1DI076- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
ATHENS TIP #
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: PUBLIC TRANSIT SERVICE IN ATHENS AND CLARKE COUNTY
CST: 2002
FED Share:
PROJECT: IV7027- TYPE WORK: CAPITAL
ATHENS TIP #
LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
PROJECT: TOOOl14 TYPE WORK: CAPITAL
ATHENS TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 ATHENS SECTION 5307 CAPITAL
PROJECT: TOOOl15 TYPE WORK: CAPITAL
ATHENS TIP #
LENGTH (miles./ km)
DESCRPT: FY 2003 ATHENS SECTION 5309 CAPITAL
PROJECT: TOOOl16 TYPE WORK: CAPITAL
ATHENS TIP #
LENGTH (miles /km)
DESCRPT: FY 2003 ATHENS SECTION 5310 CAPITAL
OTH Share:
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTH Share:
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Shure:
OTH Share:
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$1,554,000 $1,381,000
$173,000 $173,000
$609,000 $541,000
$68,000 $68,000
$2,454,000 $455,000
$1,999,000
$18,000 $16,000
$2,000 $2,000
$673,000 $598,000
$75,000 $75,000
$450,000 $400,000
$50,000 $50,000
$18,000 $18,000
$5,000
~~: ~;i;~
PROJECT: TOOOl17 TYPE WORK: OPERATING
ATHENS TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 ATHENS SECTION 5307 OPERATING
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
OTH Share:
$2,503,000 $464,000
$2,039,000
Page 79 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. - - - - , - - - - 9/21/00 , - - - - - - - - - - - - _ . _ - - - -
CLARKE COUNTY
PROJECT: TOOO)54 TYPE WORK: CAPITAL
ATHENS TIP #
LENGTH (miles / km)
DESCRPT: FY 200 I ATHENS SECTION 53) 0 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 200)
FED Share:
GA Share:
$)7,000 $)7,000
$4,000
PROJECT: TOOO)55 TYPE WORK: CAPITAL
ATHENS TIP #
LENGTH (miles / km)
DESCRPT: FY 2002 ATHENS SECTION 5310 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$)8,000 $)8,000
$4,000
<!S": ':.-
tj:
,. Page 80 of336
~ I
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_
_
~
,------_._-------,.. - ' - - - .. ~.=_"' ~oo;_ _
9/21/00
-.. -~..
CLAY COUNTY
PROJECT: 422230- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km)7.44 / I 1.98
DESCRPT: SR 1 FM BLUFFTON BYP TO CA.RNEGIE VILULAH RD/CR 153/RANDOLPH
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 42223X- 42Y230-
PE: 1993 ROW: 2001 CST: 2003
GA Share:
UNDERWAY $1,119,000 $ 11,762,000
$ 11,762,000
Page 81 of336
'------ __ '-_.''''--,-.-; - STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
.. ........,,"''''--,~''' _-;.,'-~_.
........
....._-----~_.-_._.,,.. ....
CLAYTON COUNTY
PROJECT: 0000090 TYPE WORK: SIDEW ALKS
ATLANTA TMA TIP # CL AR BP238
LENGTH (miles / km)
DESCRPT: FOREST PARK SIDEWALKS & LANDSCAPING
FUND:STP 0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share: .
$1,126,000 $901,000
OTH Share:
PROJECT: 0000340 TYPE WORK: CAPITAL
FUND: CMAQ
PE:LOCL
ATLANTA TMA TIP # CL AR 238A
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: CLAYTON COUNTY PUBLIC TRANSPORTATION SYSTEM - PHASE I
CST: 2001
FED Share:
$225,000
$5,000,000 $4,000,000
PROJECT: 0000375 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: 1M
ATLANTATMATIP#ARI30P
LENGTH (miles/km) 0/0.00
DESCRPT: 1-285/1-75 INTERMEDIATE SOLUTION TO REDUCE TRUCK OVERTURNING
OTH Share:
PE: 2000 ROW: NONE CST: 2001 FED Share: GA Share:
$1,000,000
UNDERWAY
$1,500,000 $1,350,000
$150,000
PROJECT: 0000541 TYPE WORK: SIGNALS
FUND: STP
ATLANTA TMA TIP # AR l30H
LENGTH (miles / km) 0/0.00
DESCRPT: SR 3/SR 154 INSTALL TRAFFIC SIGNAL LOOPS @ VARIOUS LOCATIONS
LUMP SUM PROJECT
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$76,000 $60,800 $15,200
PROJECT: 0000564 TYPE WORK: REALIGNMENT
FUND: STP
ATLANTA TMA TIP Ii CL AR 230
LENGTH (miles / km) 1.75 /2.82
DESCRPT: LOOP ROAD REALIGNMENT FM LAKE MIRROR RD TO RIVERDALE RD
PE:LOCL ROW: LOCL CST: 2003 FED Share:
PROJECT: 0000618 TYPE WORK: VEHICLE PURCHASES
ATLANTA TMA TIP # CL AR 238B
LENGTH (miles / km)
DESCRPT: CLAYTON COUNTY CNG BUS PURCHASE: PHASE 2
OTH Share:
FUND: CMAQ
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
PROJECT: 0000619 TYPE WORK: VEHICLE PURCHASES
ATLANTA TMA TIP # CL AR 238C
LENGTH (miles / km)
DESCRPT: CLAYTON COUNTY CNG BUS PURCHASE: PHASE 3
OTH Share:
FUND: CMAQ 0/0.00
PE: NONE ROW: NONE CST: 2003 FED Share:
OTH Share:
PROJECT: 0000620 TYPE WORK: OPERATING
FUND: CMAQ
PE:NONE
ATLANTA TMA TIP # CL AR 239A
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: CLAYTON COUNTY BUS SYSTEM OPERATING ASSISTANCE: PHASE I
CST: 2002
FED Share:
OTH Share:
$5,000,000 $4,000,000 $1,000,000
$4,860,000 $3,888,000
$972,000
$3,240,000 $2,592,000
$648,000
$5,000,000 $4,000,000 $1,000,000
Page 81 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
-----_..._.,.-..---,91-21-10-0 _.--,._,-----... _._-__----_.
CLAYTON COUNTY
PROJECT: 0000621 TYPE WORK: SIDEWALKS
ATLANT A TMA TIP # CL AR BP004
LENGTH (miles / km)
DESCRPT: RIVERDALE SIDEWALKS TO SCHOOLS
FUND: CMAQ 0/0.00
PE: LOCL ROW: LOCL CST: 2003 FEDSllare:
$1,250,000 $1,000,000
PROJECT: 0000622 TYPE WORK: SIDEWALKS
ATLANT A TMA TIP # CL AR BP239
LENGTH (miles / km)
DESCRPT: FOREST PARK SIDEWALKS TO SCHOOLS - PHASE I
OTH Share:
FUND: CMAQ 0/0.00
PE: LOCL ROW: LOCL CST: 2003 FED Shure:
$250,000
$1,875,000 $1.500,000
PROJECT: 0000623 TYPE WORK: SIDEWALKS
ATLANT A TMA TIP # CL AR BP240
LENGTH (miles / km)
DESCRPT: FOREST PARK SIDEWALKS TO SCHOOLS - PHASE 2
OTH Share:
FUND:CMAQ
PE:LOCL
0/0.00
ROW: LOCL
CST: 2003
FED Share:
$375,000
$1,000,000 $800,000
OTH Share:
PROJECT: 0000646 TYPE WORK: OPERATING
FUND: CMAQ,
PE:NONE
ATLANT A TMA TIP # CL AR 239B
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: CLAYTON COUNTY BUS SYSTEM OPERATING ASSISTANCE: PHASE 2
CST: 2003
FED Share:
$200,000
$4,000,000 $3,200,000
PROJECT: 0000674 TYPE WORK: ATMS/ITS
ATLANTA TMA TIP # CL 224B
LENGTH (miles / km)
DESCRPT: ATMS: CLAYTON ATMS ENHANCEMENT - PHASE 2
OTH Share:
FUND: CMAQ 0/0.00
PE: LOCL ROW: LOCL CST: 2002 FEDShclTe:
$800,000
$785,000 $628,000
OTHShare:
PROJECT: 712602- TYPE WORK: BRIDGES
ATLANTA TMA TIP # CL 059
LENGTH (miles / km)
DESCRPT: LEE STREET IN MORROW OVER 1-75
EXIST. LANES: 00 PROPOSED LANES: 02
ASSOCIATED PROJECTS: 712630-
FUND:NHS 0.08/0.13
PE: 1992 ROW: LOCL CST: 2003 FED Share: GA Share:
$157,000 .
UNDERWAY
$1,076,000 $860,800 $215,200
PROJECT: 712630- TYPE WORK: INTERCHANGE
FUND: NHS
ATLANTA TMA TIP # CL AR 031
LENGTH (miles/km) 2.4 /3.86
DESCRPT: 1-75 FM MT ZION BLVD TO OLD DIXIE(BRIDGES)& SR 54 INTERCH
.ASSOCIATED PROJECTS: 712602-
PE: 1992 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $920,000
$15,139,000 $12,111,200
$3,027,800
.
;~
~'.':...:. ~>
PROJECT: 713210- TYPE WORK: RAMP
ATLANTA TMA TIP # CL AR 179
LENGTH (miles / km)
DESCRPT: 1-285 EAST TO 1-75 SOUTH RAMP ALIGNMENT
FUND: 1M 1.4712.37
PE: 1995 ROW: 2001 CST:
UNDERWAY $680,000
AFTER 2003
Page 83 of336
-,
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
CLAYTON COUNTY
PROJECT: 71337W- TYPE WORK: A T M S I I T S F U N D : C M A Q .
ATLANTA TMATIP # DK AR 2 I 4
LENGTH (miles / km) 0/0.00
DESCRPT: ATMS/I-285 SURVEIL FM I-75ICLAYTON NE THRU FULTN TO I-20/DEK
v,
ASSOCIATED PROJECTS: 7 I3373-
PE:NONE ROW: NONE CST: NONE
PROJECT: 713880- TYPE WORK: INTERCHANGE
FUND:NHS
ATLANTA TMA TIP # CL AR 223A
LENGTH (miles / km) 1.2/ 1.93
DESCRPT: 1-75 NEW INTERCHANGE BETWEEN SR 54 & OLD DIXIE HWY & CD SYS
PE:,2002 ROW: CST:
$750,000 AFTER 2003 AFTER 2003
PROJECT: 714070- TYPE WORK: ATMS/ITS I
FUND: CMAQ
PE:NONE
ATLANTA TMA TIP # AR 282
LENGTH (miles / km) 3.53/5.'68
ROW: NONE
DESCRPT: ATMS/I-75 SURVEILLANCE DEVICES FM TARA BLVD TO 1-285
CST: 2001
FED Share:
GA Share:
$1,784,000 $1,427,200
$356,800
PROJECT: 714075- TYPE WORK: ATMS/ITS
FUND:NHS
ATLANT A TMA TIP # AR 307
LENGTH (miles / km) 10.5 / 16.89
DESCRPT: ATMSII-75 COMM/SURVEIL FM HUDSON BR RDIHENRY TO TA~ BLVD
ASSOCIATED PROJECTS: 71407X-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$9,132,000 $7,305,600 $1,826,400
PROJECT: 714200- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # AR 157
LENGTH (miles / km) 0.3 /0.48
DESCRPT: 1-75 SOUTHBOUND EXIT RAMP TO AND WEST ALONG MT ZION BLVD
LUMP SUM PROJECT
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
.$64,600 . $57,600
$6,400
PROJECT: 721480- TYPE WORK: WIDENING
FUND:NHS
ATLANTA TMA TIP # CL 031
LENGTH (miles/km) 3.9/6.28
DESCRPT: SR 138 FM WALT STEPHENS RD EAST TO 1-75/HENRY CO & 72148X
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 72148X- 72R480-
PE:1992 ROW: 1997 CST: 2002 FED Share: GA Share:
UNDERWAY UNDERWAY $6,485,000 $5,188,000 $1,297,000
PROJECT: 731520- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
ATLANTA TMA TIP # CL 095
LENGTH (miles / km) 0.42 /0.68
. ROW: 2001
DESCRPT:, SR 3/US 19 @ CEN OF GA RAILROAD .35 MI S OF JCT 1-285
CST: 2002
FED Share:
GA Share:
UNDERWAY $391,000
$3,500,000 $2,800,000 , $700,000
PROJECT: 731885- TYPE WORK: SIGNALS
FUND: STP
ATLANTA TMA TIP # CL 235
LENGTH (miles / km) 0/0.00
DESCRPT: SR 85 FM SR331 TO POINTE SOUTH PKWY & SRI38 FM SR85 TO NAVE
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$657,000 $525,600 $131,400
Page 84 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
---_._-'""'------- --..---_._-- __.. .~.~--....~---....-:---_:
9/21/00
~-,-"'---"--------
...
CLAYTONCOUNTY
i
PROJECT: 742870- TYPE WORK: WIDENIN.G
FUND: STP
ATLANTA TMA TIP # CL IOI
LENGTH (miles/ km) 5.7319.23
DESCRPT: SR 920 FROM SR 54 TO SR 3/US 19 {REL SR 81 J& FAYETTE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 74287X-
PE: 2003 ROW: CST:
$1,250,000 AFTER 2003 AFTER 2003
PROJECT: 751810- TYPE WORK: WIDENING
ATLANTA TMA TIP # CL 020
LENGTH (miles I km)
DESCRPT: FLINT RIVER RD FM WEBB DR TO TARA BLVD
EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 2.82 14.54
PE: 2001 ROW: LOCL CST:
$10,000 AFTER 2003
PROJECT: 752180- TYPE WORK: WIDENING
FUND: STP
ATLANTATMATIP#CL074
LENGTH (mileslkm) 1.712.74
DESCRPT: CONLEY RD (AVIATION BLVD EXT) FM OLD DIXIE HWY/SR 3 TO SR 54
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2001 ROW: LOCL CST:
$5 I ,000 AFTER 2003
PROJECT: 753010- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # CL 234
LENGTH (miles I km) 0.2 I 10.34
ROW: LOCL
DESCRPT: CR 1351/REX ROAD @LITTLE COTTON INDIAN CREEK IN REX
CST: 2002
FED Share:
GA Share:
:.:'
...;..:... ....
PROJECT: 762609- TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # CL AR BP092
LENGTH (miles I km) 5.6/9.02
ROW: LOCL
DESCRPT: FOREST PARK ALONG US 19/41; SR 54; SR 160 & SR 331
CST: 2001
FED Share:
UNDERWAY $1,645,000 $1,316,000
$329,000
$625,000 $500,000
PROJECT: 77120X- TYPE WORK: BRIDGE PAINTING
FUND: STP
ATLANTATMATIP#ARI3ID
LENGTH (miles r km) 010.00
DESCRPT: BRIDGE PAINTING IN COBB & CLAYTON COUNTIES177I 2051Y20.5
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 771205-
OTHShare:
PE:NONE ROW: NONE CST: NONE
$125,000
PROJECT: 771226- TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # CL AR BP022B
LENGTH (miles I km)
DESCRPT: JESTERS CREEK GREENWAY PHASE II
PROJECT: 7V704 I- TYPE WORK: CAPITAL
ATLANTA TMA TIP # CL 233D
LENGTH (miles I km)
. ,.~._",
~
~G>
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: STP 010.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
FUND: TRANSIT
PE: NONE
010.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$1,250,000 $1,000,000
$250,000
$26,000 $26,000 $7,000
Page 85 of336
----
STATE,~~rr~l',~l.lJ:A,TJ(JNIMl'1f;()VEMENr~~OGRAM
""'~---~
9/21/00
_ _ w
___.._~
, _---:
_
CLAYTON COUNTY
PROJECT: M000522 TYPE WORK: RESURFACE & MAINTENANCE
FUND: 1M
ATLANTA TMA TJP # AR I30P
LENGTH (miles /km) 5.21 /8.39
DESCRPT: SR 403/1-85 FM S OF RIVERDALE RD TO BR OVER S:TEWA"RT AVE
LUMP SUM PROJECT'
PE:,NONE ROW: NONE CST: 2001 FED Share: GA Share:
$1,271,000 $1,016,800
$254,200
PROJECT: T000002 TYPE WORK: CAPITAL
ATLANTA TMA TIP # CL 2330
LENGTH (miles / km)
DESCRPT: FY 2002 CLAYTON COUNTY SECTION 53 IO
FUND: TRANSIT 0/0.00
. . PE:NONE .
ROW: NONE
CST: 2002
FE.D,Share:
GA Share:
$28,000 $28,000
$7,000
PROJECT: T000021 TYPE WORK: CAPITAL
ATLANT A TMA TIP # CL 233D
LENGTH (miles / km)
DESCRPT: FY 2003 CLAYTON COUNTY SECTION 5310
FUND: TRANSIT . PE: NONE
0/0.00
ROW: NONE
CST: 2003
. FED Share:
GA Share:
$29,000 $29,000 $7,000
PROJECT: T000037 TYPE WORK: CAPITAL
ATLANT A TMA TIP # CL AR 238E
LENGTH (miles / km)
DESCRPT: FY 2001 CLAYTON COUNTY CAPITAL SECTION 5307
PROJECT: T000038 TYPE WORK: CAPITAL
ATLANTA TMA TIP # CL AR 238E
LENGTH (miles / km)
DESCRPT: FY 2002 CLAYTON COUNTY CAPITAL SECTION 5307
PROJECT: T000039 TYPE WORK: CAPITAL
ATLANTA TMA TIP # CL AR 238E
LENGTH (mileslkm)
DESCRPT: FY 2003 CLAYTON COUNTY CAPITAL SECTION 5307
FUND: TRANSIT
PE:NONE
0/,0.00
ROW: NONE
CST: 2001
'FED Share:
GA Share:
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTHShare:
$2,700,000 $2,400,000
$300,000 $300,000
$1,170,000 $1,040,000
$130,000 $130,000
, $720,000 $640,000
$80,000 $80,000
:;... " ~> r.
~;>
Page 86 of336
STATE TRANSPORTATIONIMPROVEMENT PROGRAM
- - ----------_._-~,_.
9/21/00
CLINCH COUNTY
PROJECT: 422030- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 2.4 /3.86
DESCRPT: SR 38/US 84 AND SR 89/US 441 WIDENING THROUGH HOMERVILLE
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 1999 CST: 2003
GA Share:
UNDERWAY UNDERWAY
$4,558,000
$4,558,000
PROJECT: 422055- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1992
LENGTH (miles / km) 0.6 / 0.97
ROW: NONE
DESCRPT: SR 38/US 84 @SUWANNOOCHEECREEK; ALAPAHA RVR & OVERFLOW
CST: 2001
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 422050-
GA Share:
UNDERWAY
$5,000,000 $4,000,000 $1,000,000
PROJECT: 42205X- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 0/0.00
DESCRPT: SR 38/US 84 FM W/ALAPAHA RVRlLOWNDES TO DUPONT/SEE LANIER
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 422050-
PE:NONE ROW: NONE CST: NONE
PROJECT: 422060- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 7.4 / 11.91
DESCRPT: SR 38/US 84 FM CR 207/DUPONT TO WEST CLiHOMERVILLE
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 . ROW: 1997 CST: 2001
GA Share:
UNDERWAY UNDERWAY $9,756,000
$9,756,000
PROJECT: 422120- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 11.8/19.00
DESCRPT: SR 38 FM WEST OF WOODYARD CK TO W OF GREASY CK 142212X
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 42212X- 422125- 42Y120-
PE: 1994 ROW: 2001 CST:
UNDERWAY $2,862,000 AFTER 2003
PROJECT: 42Y 400- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 89IUS 441 FM CR 8 FARGO TO CR 40/204 - FOR FED PE; 422400
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 422400-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 42Y410- TYPE WORK: WIDENING
FUND:NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 89/US 441 FM CR 40/204 TO SHIRLEY RD - FOR FED PE; 422410
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 422410-
PE: 2001 ROW: NONE CST: NONE
$1,000
: !!"
. Page87of336
--_..._ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
STATE TRANSPORTATION IMPROVEMENT PROGRAM
,.-...- ..........
..._. .....
........_ _,, ..- - . . .
, - ~ "_.~
9/21/00
"._
._._4101
....,_ _
COBB COUNTY
PROJECT: 0000102 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # CO AR BP204
LENGTH (miles / km)
DESCRPT: SMYRNA - SPRING ROAD LINEAR PARK
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000555 TYPE WORK: TURN LANES
ATLANTA TMA TIP # CO 313
LENGTH (miles / km)
DESCRPT: CHASTAIN RD @ BELLS FERRY RD/CR 2845
FUND: STP 0.2/0.32
OTHShare:
PE: 2002 ROW: LOCL CST: 2003 FED Share:
PROJECT: 0000556 TYPE WORK: TURN LANES
ATLANTA TMA TIP # CO 314
LENGTH (miles / km)
DESCRPT: CHASTAIN RD@BUSBEEPKWY
FUND: STP 0.2/0.32
OTHShare:
PE: 2002 ROW: LOCL CST: 2003 FED Share:
PROJECT: 0000557 TYPE WORK: TURN LANES
ATLANTA TMA TIP # CO 315
LENGTH (miles / km)
DESCRPT: CHASTAIN RD @ BIG SHANTY RDITOWN POINT DRIVE
FUND: STP 0.2 /0.32
OTHShare:
PE: 2002 ROW: LOCL CST: 2003 FED Share:
PROJECT: 0000558 TYPE WORK: TURN LANES .
ATLANTA TMA TIP # CO 316
LENGTH (miles / km)
DESCRPT: BARRETT PKWY @ COBB PKWY/SR 3
FUND: STP 0.21 0.32
OTHShare:
PE: 2002 ROW: LOCL CST: 2003 FED Share:
OTH Share:
PROJECT: 0000559 TYPE WORK: TURN LANES
ATLANTA TMA TIP # CO 317
LENGTH (miles / km)
DESCRPT: BARRETT PKWY @ ROBERTS BLVO
FUND: STP . 0.2/0.32
PE: 2002 ROW: LOCL eST: 2003 FED Share:
PROJECT: 0000560 TYPE WORK: PARK & RIDE LOT
ATLANTA TMA TIP # CO 318
LENGTH (miles / km)
DESCRPT: CCT PARK AND RIDE LOTS @ 3 LOCATIONS
FUND: STP . 0 /0.00
OTH Share:
PE:2001 ROW: 2001 eST: 2001 FED Share: '
~. ;~.
~~:
PROJECT: 0000598 TYPE WORK: SPECIAL STUDIES
ATLANTA TMA TIP # AR 370A
LENGTH (miles / km)
DESCRPT: CUMBERLAND RAIL CIRCULATOR ANALYSIS: PHASE I
OTHShare:
FUND:CMAQ 0/0.00
PE: 2001 ROW: NONE eST: NONE
$882,000 $706,000
$176,000 $48,000
.$250,000 $200,000
$50,000 $10,000
$75,000 $60,000
$15,000 $30,000
$100,000 $80,000
$20,000 $92,000
$450,000 $360,000
$90,000 $23,000
$65,000 $52,000
$13,000 $100,000 $400,000 $1,645,000 $1,316,000
$329,000 $800,000
Page 88 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
---- 9/21/00 -------------
COBB COUNTY
PROJECT: 0000599 TYPE WORK: SPECIAL STUDIES
ATLANTA TMA TIP # AR 370B.
.LENGTH (miles I km)
DESCRPT: CUMBERLAND RAIL CIRCULATOR ANALYSIS: PHASE 2
FUND:CMAQ 010.00
PE:2002 ROW: NONE CST: NONE
$1,200,000
PROJECT: 0000624 TYPE WORK: VEHICLE PURCHASES
FUND: CMAQ
PE:NONE
ATLANT A TMA TIP # CO AR 278
LENGTH (miles I km) 0 10.00
ROW: NONE
DESCRPT: CCT TOWN CENTER SHUTTLE SYSTEM PURCHASE - 12 MINI BUSES
CST: 2002
FED Share:
OTH Share:
PROJECT: 0000625 TYPE WORK: VEHICLE PURCHASES
FUND: CMAQ
PE:NONE
ATLANT A TMA TIP # CO AR 279
LENGTH (miles I km) 0 10.00
ROW: NONE
DESCRPT: CUMBERLAND SHUTTLE SYSTEM PURCHASE - 15 MINI BUSES
CST: 2003
FED Share:
OTH Share:
PROJECT: 0000626 TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # CO AR BPI30
LENGTH (mileslkm) 010.00
ROW: LOCL
DESCRPT: DILLARD ST FM SILVER COMET TRAIL TO MARIETTA STREET
CST: 2001
FED Share:
OTH Share:
PROJECT: 0000627 TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # CO AR BPI76A
LENGTH (miles I km) 1.2 I 1.93
ROW: LOCL
DESCRPT: SHIPP RD SIDEWALKS FM FLORENCE RD TO OLD LOST MTN
CST: 2002
FED Share:
OTH Share:
PROJECT: 0000628 TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # CO AR BPI89
LENGTH (miles I km) 4.417.08
ROW: LOCL
DESCRPT: SOUTH COBB DR EXTEND SIDEWALKS TO FAIRGROUNDS & MANER RD
CST: 2003
FEDShllre:
OTHShare:
PROJECT: 0000629 TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # CO AR BP 190
LENGTH (miles I km) 2.52 14.06
ROW: LOCL
DESCRPT: ROSWELL RD SIDEWALKS FM COBB PKWY TO ROBINSON RD
CST: 2003
FED Share:
PROJECT: 0000630 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # CO AR BP205
LENGTH (miles I km)
DESCRP~ AUSTELLSTREETSCAPEIMPROVEMENTS-3STREETS
$:
tJ'
OTHShare:
FUND: CMAQ
PE: LOCL
010.00
ROW: LOCL
CST: 2003
FED Share:
OTH Share:
$3,500,000 $2,800,000
$700,000
$4,250,000 $3,400,000
$850,000
$299,000 $239,000 $60,000
$360,000 $288,000 $72,000
$930,000 $744,006 $186,000
$1,003,000 $802,000 $201,000
$1,563,000 $1,250,000
$313,000
Page 89 of336
__ --_. .._- -------------------:-----
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
COBB COUNTY
PROJECT: 0000631 TYPE WORK: BRIDGES
FUND: CMAQ
ATLANTA TMA TIP # CQ AR BP209
LENGTH (miles / km) 0.2 /0.32
DESCRPT: SILVER COMET TRAIL GRADE SEPARA nON AT SR 6/US 278
PE:LOCL ROW: LOCL CST: +003 FED Share:
PROJECT: 712760- TYPE WORK: NEW CONSTRUCTION
FUND: NHS
ATLANT A TMA TIP # CO AR 070B
LENGTH (miles 1 km) 0.681 1.09
DESCRPT: EAST-WEST CONN INTCH W/I-285 E RAMPS& ATLANTA RD BRDG-PH6
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 712762-
OTHShare:
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:
$436,000 $349,000
$87,000
UNDERWAY $3,962;000 $11,579,000 $9,263,200 $2,315,800
PROJECT: 712762 TYPE WORK: NEW CONSTRUCTION
FUND:NHS
ATLANT A TMA TIP # CO AR 070C
LENGTH (miles 1 km) 0.68 11.09
DESCRPT: EAST-WEST CONN @ 1-285 W RAMPS AND CD ROADSI PHASE 7
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 7 I2760-
PE: 1996 ROW: LOCL CST: 2003 FED Share: GA Share:
UNDERWAY
$9,519,000 $7,615,200 $1,903,800
PROJECT: 712806- TYPE WORK: INTERCHANGE
FUND: 1M
ATLANTA TMA TIP # CO AR 078M
LENGTH (miles 1 km} 0.2 /0.32
DESCRPT: KENNEDY INTERCHANGE 1-75NB TO P285WB FLYOVER BRIDGE (CT 5)
EXIST. LANES: 00 PROPOSED LANES: 02
PE: 1997 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$10,00 I ,000 $9,000,900 $1,000,100
PROJECT: 713640- TYPE WORK: WIDENING
FUND: NHS
ATLANTA TMA TIP # AR 318B
LENGTH'(miles / km) 13.1 121.06
DESCRPT: 1-575 FM 1-75 NORTH TO SIXES ROAD/CHEROKEE ~ FOR HOV
EXIST. LANES: 04 PROPOSED LANES: 06
. ASSOCIATED PROJECTS: 71364X-
PE: 2001 ROW: NONE CST:
$7,000,000 AFTER 2003
PROJECT: 713700- TYPE WORK: REST AREA
FUND:NHS
ATLANTA TMA TIP# CO AR 274
LENGTH '(miles 1 km) 0.2/0.32
DESCRPT: 1-75 CONSTRUCT GATEWAY WELCOME CENTER @ WADE GREEN ROAD
PE: 1996 ROW: NONE eST: 2001 FED Share:
PROJECT: 714020 TYPE WORK: BRIDGE PAINTING
ATLANTA TMA TIP # AR 131L
LENGTH (miles / km)
DESCRPT: BRIDGE PAINTING ON INTERSTATES IN COBB COUNTY
LUMP SUM PROJECT
FUND: 1M 0/0.00
OTH Share:
PE:NONE ROW: NONE eST: 2001 FED Share: GA Share:
UNDERWAY $ I4,000,000 . $ I 1,200,000
$2,800,000
$491,000 $441,900
$49,100
PROJECT: 714090- TYPE WORK: ATMS/ITS
FUND:NHS
ATLANTA TMA TIP # AR 341
LENGTH [miles r km) 8.58/13.81
DESCRPT: ATMS/I-575 COMM/SURVEILLANCE FM 1-75 TO SR 92/CHEROKEE
ASSOCIATED PROJECTS: 71409X
PE: 2001 ROW: NONE eST: 2002 FED Sit are: GA Share:
$100,000
$6,332,000 $5,065,600 $1,266,400
Page 900/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
COBB COUNTY
PROJECT: 714130- TYPE WORK: HOY LANES
FUND:NHS
ATLANTA TMA TIP # AR 3 I 8A
LENGTH (miles 1 km) 14.2122.78
DESCRPT: 1-75 FM KENNEDY PKWY TO WADE GREEN ROAD FOR HOY LANES
EXIST. LANES: 08 PROPOSED LANES: 10
PE: 2001 ROW: 2003 CST:
$9,999,000 $13,000,000 AFTER 2003
PROJECT: 714150- TYPE WORK: TURN LANES
ATLANTA TMA TIP # CO 308
LENGTH (miles 1 km)
DESCRPT: 1-75 AT CHASTAIN RD - SB AND NB OFF RAMPS
FUND:NHS
0.56/0.90
PE: 1999 ROW: NONE . CST: 2002 FED Share: GA Share:
UNDERWAY
$1,754,000 $1,403,200
$350,800
PROJECT: 714160- TYPE WORK: TURN LANES
ATLANTA TMA TIP # CO 309
LENGTH (miles I km)
DESCRPT: 1-575 AT BARRETT PARK WAY - SB & NB OFF RAMPS
FUND:NHS
0.68/1.09
PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 714170- TYPE WORK: TURN LANES
ATLANTA TMA TIP # CO 310
LENGTH (miles 1 km)
DESCRPT: 1-575 AT CHASTAIN RD - SB AND NB OFF RAMPS
FUND:NHS
0.62/1.00
PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:
UNDERWAY
$990,000 $792,000 $198,000
PROJECT: 714180- TYPE WORK: SIDEWALKS
FUND:NHS
ATLANTA TMA TIP # CO AR BPI99
LENGTH (mileslkm) 0.42/0.68
DESCRPT: CUMBERLAND BOULEVARD OYER 1-285 - ADDITION OF SIDEWALKS
PE: 2000 ROW: NONE CST: 2001 FED Share: GA Share:
$15,000
$300,000 $240,000
$60,000
PROJECT: 731865- TYPE WORK: REPLACE BRIDGE
ATLANTA TMA TIP # CO 3 I I
LENGTH (miles 1 km)
DESCRPT: SR 92 @ PROCTOR CREEK (LAKE) IN SW ACWORTH
FUND: BRIDGE
PE: 2000
0.23 10.37
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$791,000 $632,800 $158,200
PROJECT: 752290- TYPE WORK: NEW CONSTRUCTION
FUND: STP
ATLANTA TMA TIP # CO AR 078K I
LENGTH (miles 1 km)
I 1 1.61
DESCRPT: KENNEDY INTCH-MILL GREEN PKWY FM AKERS MILL TO INT.PKY"Y" .
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 75Y290-
PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$9,004,000 $7,203,200 $1,800,800
. L~}
PROJECT: 752295- TYPE WORK: NEW CONSTRUCTION
FUND: STP
ATLANTA TMA TIP # CO AR 078L
LENGTH (miles 1 km) 0.5 10.8 I
DESCRPT: KENNEDY INTCH-RIYERWOOD PKWY FM US 41 TO CUMBERLAND CIR
PE: 1995 ROW: LOCL CST: 2003 FED Share: GA Share:
UNDERWAY
$2,400,000 $1,920,000
$480,000
Page 91 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
COBB COUNTY
PROJECT: 752630- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
ATLANTA TMA TIP # CO 272
LENGTH (miles r km) 0.2/0.32
DESCRPT: CR 4455/CANTON ROAD & RR B~ OVER SR 3/US 41 N OF MAf\IETTA
ASSOCIATED PROJECTS: 75Y63Q-
PE: 1997 ROW: 2001 CST:
UNDERWAY $2,000,000 AFTER 2003
PROJECT: 753025- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
, ATLANTA TMA TIP # CO 281
LENGTH (miles / km) 0.55/0.89
DESCRPT: MARIETIA ST/SR 6 BU FM NEW MACLAND RD TO BROWNSVILLE RD/BIKE
EXIST. LANES: 03 PROPOSED LANES: 02
ASSOCIATED PROJECTS: 771230-
PE: 1999 ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 75Y290- TYPE WORK: NEW CONSTRUCTION
FUND: 1M
ATLANTA TMA TIP # CO AR 078K2
" . LENGTH (miles / km)
I /1.61
DESCRPT: KENNEDY INTCH-MILL GREEN PKWY FM AKERS MILL TO INT.PKY"Y"
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: . 752290-
PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$1,800,000 $1,440,000
$360,000
UNDERWAY
$2,500,000 $2,250,000
$250,000
. PROtECT: 762450- TYPE WORK: VEHIGLE PURCHASES
ATLANTA TMA TIP # CO AR 273
LENGTH (miles / km)
DESCRPT: REPLACEMENT OF 10 CNG EXPRESS & LOCAL BUSES
FUND:STP
0/0.00
PE:LOCL ROW: NONE CST: 2001 FED Share:
PROJECT: 762470- TYPE WORK: VEHICLE PURCHASES
ATLANTA TMA TIP # CO 282
LENGTH (miles I km)
DESCRPT: EXPRESS B,US SERVICE IN 1-75 CORRIDOR (YEAR I)
OTH Share:
FUND:CMAQ
PE:LOCL
0/0.00
ROW: NONE
CST: 2001
FED Share:
'PROJECT: 762471~. TYPE WORK: VEHICLE PURCHASES
ATLANTA TMA TIP # CO 283
I LENGTH (miles / km)
DESCRPT: EXPRESS BUS SERVICE IN 1-20 CORRIDOR (YEAR I)
OTH Share:
FUND: CMAQ
PE:LOCL
0/0.00
ROW: NONE
CST: 2001
FED Share:
OTH Share:
PROJECT: 762494- TYPE WORK: BICYCLE/PED. FACILITY
FUND:O-:1AQ
: PE: 1995
ATLANTA TMA TIP # CO AR BPI24B
LENGTH (miles / km) 0/0.00
ROW: LOCL
DESCRPT: PH 2 LUCILLE CREEK TRAIL' FM SILVER COMET TRAIL TO SHIPP RD
CST: 2002 '
FED Share:
~,
l~J'
OTHShure:
\
PROJECT: 762558- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
PE:,NONE
ATLANTA TMA TIP # CO AR BPI87C
LENGTH (mileslkm) 0.95/1.53
ROW: LOCL
DESCRPT: CUMBERLAND AND TOWN CENTER AREA & TRANSIT LINKAGES - PHASE 3
CST: 2001
FED Share:
OTH Share:
$3,250,000 $2,600,000
$650,000
$2,200,000 $1,760,000
$440,000
$2,200,000 $1,760,000
$440,000 UNDERWAY
$560,000 $448,000 $112,000
$1,000,000 $800,000 $200,000
Page 92 of336
-----,------STAT~ TRANSPORTATION IMPROvEMENT PROGRAM
9/21/00
COBB COUNTY
PROJECT: 770922- TYPE WORK: BICYCLE/PED, FACILITY
ATLANTA TMA TIP # CO AR I77B
LENGTH (miles / km)
DESCRPT: VILLAGE PKWY FM SPRING RD TO WINDY HILL ROAD
FUND: CMAQ
PE: 1995
L2 / L93
ROW: NONE
CST: 2001
FED Share:
PROJECT: 771205- TYPE WORK: BRIDGE PAINTING
FUND: STP
ATLANTA TMA TIP # AR 131H
LENGTH (miles / km) 0/0.00
DESCRPT: BRIDGE PAINTING IN COBB & CLAYTON COUNTIESI77Y205\X
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 77120X- 77Y205-
OTH Share:
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY $165,000 $132,000 $33,000
$386,000 $308,800
$77,200
PROJECT: 77Y205- TYPE WORK: BRIDGE PAINTING
FUND: 1M
ATLANTA TMA TIP # AR 131L
LENGTH (miles / km) 0/0.00
DESCRPT: BRIDGE PAINTING IN COBB & CLAYTON COUNTlES17712051X
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 771205-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$143,000 $128,700 $14,300
PROJECT: 7D7603- TYPE-WORK: CAPIT AL
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 0/0,00
ROW: NONE
DESCRPT: TRANSIT CAPITAL (SECTION 5307) ASSISTANCE FOR FY 2001
CST: 2001
FED Share:
'GA Share:
OTH Share:
PROJECT: 7D7606- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: CAPITAL IMPROVEMENTS FOR FY 2002
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTH Share:
PROJECT: 7V7042- TYPE WORK: CAPITAL
ATLANTA TMA TIP # CO AR 23 I D
LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$9,457,000 $8,406,000 $1,051,000 $1,051,000
$4,641,000 $4,125,000
$516,000 $516,000
$69,000 $69,000 $17,000
PROJECT: MOOOl73 TYPE WORK: RESURFACE & MAINTENANCE
ATLANTA TMA TIP # AR 130H
LENGTH (miles / km)
DESCRPT: SR 5 FROM SR 8 TO SR 280
LUMP SUM PROJECT
FUND: STP 8.24/13.27
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$2,816,000 $2,252,800
$563,200
'"
~.
~~.~.:.
PROJECT: MOOOl74 TYPE WORK: RESURFACE & MAINTENANCE
FUND: STP
ATLANTA TMA TIP # AR l30H
LENGTH (miles / km) 8.18/13.17
DESCRPT: SR 280 FM CHATTAHOOCHEE RIVTO SR 5/AUSTELL ROAD
LUMP SUM PROJECT
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$2,624,000 $2,099,200
$524,800
Page 93 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _ _ _ _ _ _ ~ _ _ "''''
9/21/00
1''O<I''!~~
'''''''... _ _ ....__,~_._"
,
.... _
..
,~_.
_
COBB COUNTY
~~" .
PROJECT: TOOOOl2 TYPE WORK: CAPITAL
FUND: TRANSIT
PE: NONE
ATLANTA TMA TIP # CO AR 231 D
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: FY 2002 COBB COUNTY SECTION 5310
CST: 2002 '
FED Share:
GA Share:
$72,000 $72,000 $18,000
PROJECT: T000022 TYPE WORK: CAPITAL
ATLANTA TMA TIP # CO AR 23 ID
LENGTH (miles / km)
DESCRPT: FY 2003 COBB COUNTY SECTION 53 J0
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$80,000 $80,000 $19,000
PROJECT: T000035, TYPE. WORK: CAPITAL
ATLANTA TMA TIP # CO AR 231 D
LENGTH (miles / km)
DESCRPT: FY 2003 COBB COUNTY CAPITAL SECTION 5307
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTHShare:
$4,950,000 $4,400,0,00
$550,000 $550,000
Page 94 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
- - - - - - - - - - - - - - - - - - -9-/21-/0-0 - - _.._.--*-----~-_. _ _._--
COFFEE COUNTY
PROJECT: 422250- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 311US 441 @ MILL CREEK EXIST. LANES: 02 PROPOSED LANES: 04
FUND: BRIDGE
PE: 1992
0.8/1.29
ROW: 2001
CST: 2001
FED Share:
GA Share:
UNDERWAY $125,000
$1,954,000 $1,563,200
$390,800
PROJECT: 42Y900- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 3 IIUS 441 FM CR 416 TO N OF CURRIN RD -FOR FED PE; 421900
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 421900-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 42Y905- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 3 I FM N OF CURRIN RD TO GASMAN RD - FOR FED PE; 421905
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 42 I905-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 42Y910- TYPE WORK: WIDENING
FUND:NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 311US 441 FM NIBROXTON TO SR 107 - FOR FED PE; 421910
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 421910-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 431830- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 2.45/3.94
DESCRPT: SR 135 FM SR 311US 441 EAST TO SR 32 INCLUDING RR SEPARA nON
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2002 ROW: CST:
$290,000 AFTER 2003 AFTER 2003
PROJECT: 432115- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 135 @ SATILLA RIVER APP 6 MI S OF DOUGLAS
FUND: BRIDGE
PE: 1999
0.27/0.43
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$908,000 $726,400 $181,600
PROJECT: 432116- TYPE WORK: REPLACE BRIDGE LENGTH (miles/km)
DESCRPT: SR 135 @INDIAN CREEK APP3.5 MI S OF DOUGLAS
FUND: BRIDGE
PE: 1999
0.22/0.35
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$357,000 $285,600
$71,400
r':'. '"-:.
lsi:
PROJECT: 432118- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.25/0.40
ROW: 2001
DESCRPT: SR 135IUS 221 @ RR PROP. (NO TRACKS) @ SW WEST GREEN CTY LIM
CST: 2001
FED Share:
GA Share:
UNDERWAY $10,000
$747,000 $597,600 $149,400
Page 95 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
f r '\": .. ,,-
~ .f
._--------------_ I.. .'_9/2-1/0-0---------
COFFEE COUNTY
PROJECT: 442940- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 2.37/3.82
DESCRPT: SR 158 FM 200 FT WEST OF THURSTON PAULK RD TO SR 206
EXIST. LANES: 02 PROPOSED LANES: 04
PE:2000 ROW: 2003 CST:
UNDERWAY
$I,OOO~OOO
AFTER 2003
PROJECT: 442971- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.21 /0.34
DESCRPT: SR 268/AMBROSE-BROXTON RD @ ROSES CRK 1.1 MI W OF BROXTON
PE: 1999 ROW: 2003 CST:
UN.DERWAY $10,000
AFTER 2003
-'- . .
S
:',:
~;:;,:... ,
Page 96 of336
STATE TRANSPORTATION IMPROvEMENT PROGRAM
----_ - - _ -------_ -_ _ - .. .. ._~---_._--
...
9/21/00
......
....._. --._.--,-_._. .
COLQUITT COUNTY
PROJECT: 0000082 TYPE WORK: LANDSCAPING
FUND: STP
PE:LOCL
LENGTH (miles / km) 0/0.00
ROW: LOCL
DESCRPT: DOWNTOWN MOULTRIE STREETSCAPE COMMERCIAL HISTORIC DISTRICT
CST: 2001
FED Share:
$1,250,000 $1,000,000
OTHShare:
PROJECT: 0000429 TYPE WORK: MEDIAN WORK
FUND: NHS .
LENGTH (miles / km) 1.2/ 1.93
DESCRPT: SR 35/US 319 BET MAGNOLIA & GA/FLA RAILNET XING N OF SR37
PE: 2001 ROW: 2001 CST: 2001 FED Share: GA Share:
$250,000
$45,000 $5,000
$794,000 $635,200 $158,800
PROJECT: 422450- TYPE WORK: PASSING LANES . LENGTH (miles / km)
DESCRPT: SR 133 NB & SB FROM WESLEY CHAPEL RD TO ADEL RD EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 1.5 /2.42
PE: 2003 ROW: CST:
$126,000 AFTER 2003 AFTER 2003
PROJECT: 431780- TYPE WORK: WIDENING
FUND:STP
LENGTH (miles -jkm) 4.63/7.45
DESCRPT: SR 133 FM SPENCE FIELD TO SR 35 (E.MOULTRIE BYPASS)
EXIST. LANES: 04 PROPOSED LANES: 05
.~
PE: 2002 ROW: CST:
$619,000 AFTER 2003 AFTER 2003
.
PROJECT: 442750- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
UNDERWAY
LENGTH (miles / km) 0.2/0.32
ROW: LOCL
DESCRPT: CR 493/FUNSTON-SALE CITY @ LITTLE CREEK APP I MI NW FUNSTON
CST: 2001
$580,000
FED Share:
$464,000
GA Share:
$116,000
PROJECT: 450570- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles./ km) 0.21 /0.34
ROW: LOCL
DESCRPT: CS 1079/ADEL ROAD @ OKAPILCO CREEK IN EAST MOULTRIE
CST: 2001
FED Share:
GA Share:
UNDERWAY
$721,000 $576,800 $144,200
PROJECT: 471450- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) .0.2 /0.32
ROW: LOCL
DESCRPT: CR 4/WILBURN MURPHY RD. @ LITTLE CREEK OVERFLOW S OF FUNSTON
CST: 2003
FED Share:
GA Share:
OTHShare:
PROJECT: 471455- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.23 /0.37
ROW: LOCL
DESCRPT: CR I86/HAGET STILL ROAD @ OCHLOCKONEE RIVER SE OF DOERUN
CST: 2002
FED Share:
GA Share:
OTHShare:
UNDERWAY
$215,000 $172,000
$22,000 $21,000
UNDERWAY
$438,000 $350,400
$43,600 $44,000
Page 97 of336
_~~_~._.
STATE TRANSPORTATION IMPROVEMENTPROGRAM
y_x-.-
... ~
9/21/00
, = , _ ,__ .,.. ._~~
.... .._.. r .-.. ".-. - '_ .
.
_'~
_~'
-COLQUITT COUNTY
PROJECT: 471460- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.2 /0.32
DESCRPT: CR 355/0'NEAL ROAD @ BRUSHY BRANCH APr 3.7 MI SW OF DOERUN
PE: 1999 ROW: LOCL CST: 2003
FED Share: GA Share:
OTH Shure:
PROJECT: 471465- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.2 /0.32
ROW: LOCL
DESCRPT: CS 835/SW 13TH AVE @ OCHLOCKONEE RIVER TRIB. IN MOULTRIE
CST: 2002
FED Share:
GA Share:
OTH Shure:
PROJECT: M000351 TYPE WORK: SHOULDER WORK
FUND: STP
LENGTH (miles / km) 21.6/34.74
DESCRPT: SR 33 FM SR 133 COLQUITT CO TO CROCKETT ST WORTH CO
LUMP SUM PROJECT
PE:NONE ROW: NONE CST: 2001 FED Shure: GA Share:
_
UNDERWAY
$215,000 $172,000
$22,000 $21,000 UNDERWAY
$295,000 $236,000
$29,000 $30,000
$1,370,000 $1,096,000
$274,000
.
r .~~
L j !.: .:
Page 98 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
-_ _ ......... .. ----------------_.-- 9/21/00 -- - - - - - - - - - - -
COLUMBIA COUNTY
PROJECT: 0000150 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
AUGUSTA TMA TIP # TEA-7
LENGTH (miles I km) 010.00
DESCRPT: EVANS TO LOCKS ROAD MULTI-USEFACILITY'& LANDSCAPING
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$625,000 $500,000
PROJECT: 0000695 TYPE WORK: LIGHTING
AUGUST A TMA TIP #
LENGTH (miles I km)
DESCRPT: 1-20/BELAIR ROAD INTERCHANGE LIGHTING
LUMP SUM PROJECT
FUND: NHS 0/0.00
OTH Share:
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$125,000
$287,000 $229,600
$57,400
PROJECT: 210910- TYPE WORK: REST AREA
FUND: 1M
LENGTH (miles I km) 0/0.00
DESCRPT: I-20/SR 402 SEWAGE HOOKUP FOR REST AREAS #62 AND #63
LUMP SUM PROJECT
PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$545,000 $490,500
$54,500
PROJECT: 221800- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 2.96 14.77
DESCRPT: SR 104 FM MP I 1.95 S/CR 80 TO SR 47 @ POLLARDS CORNER
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 2003 CST:
UNDERWAY $762,000
AFTER 2003
PROJECT: 221805- TYPE WORK: WIDENING
AUGUSTA TMA TIP # STP-12
LENGTH (mileslkm)
DESCRPT: SR 104 FM MP 8.95 S OF CR 515 TO MP 11.95 S OF CR 80
EXIST. LANES: 02 PROPOSED LANES: 04
FUND:STP 3/4.83
PE: 1992 ROW: 2002 CST:
UNDERWAY $1,337,000 AFTER 2003
PROJECT: 221860- TYPE WORK: WIDENING
FUND: STP
AUGUSTA TMA TIP # STP-3
LENGTH (miles I km) 2.88 14.64
DESCRPT: SR 28IFURYS FERRY RD FM RVRWATCH PKWY/RICHMONDTON OF CR 98
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 22186X- 22Y860-
PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$4,527,000 $3,621,600
$905,400
PROJECT: 222140- TYPE WORK: PASSING LANES LENGTH (miles I km)
DESCRPT: SR 47 NB MP 8.33-9.53ISB AND NB 13.48 - 15.18 EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 4.18 16.73
PE: 1997 ROW: 2002 CST:
UNDERWAY $30,000
AFTER 2003
PROJECT: 22781X- TYPE WORK: ATMS/ITS
FUND:NHS
AUGUSTA TMATIP#
LENGTH (mileslkm) 010.00
.
DESCRPT: ATMS/ AUGUSTA/RICHMOND COUNTY/GDOT REGIONAL TCC-SEE RICHMOND
f L~
ASSOCIATED PROJECTS: 227810-
PE."NONE ROW: NONE CST: NONE
Page 99 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
COLUMBIA COUNTY
PROJECT: 22Y860- TYPE WORK: WIDENING
FUND: STP
AUGUSTA TMA TIP # STP-3
LENGTH (miles I km) 0 10.00
DESCRPT: SR 28/FURYS FERRY RD FM RVRWATCH PKWY TO N OF CR 981SPLIT $
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 221860-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$2,773,000 $2,218,400
$554,600
PROJECT: 231350- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles I km) 1.43 12.30
DESCRPT: SR, 47 SB FRM MP.2.45 NEAR KEG CREEK SOUTH TO MP 3.88
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1994 ROW: 2002 CST:
UNDERWAY '$77,000
AFTER 2003
PROJECT: 231440- TYPE WORK: WIDENING
AUGUSTA TMA TIP # STP-2
LENGTH (miles I km)
DESCRPT: SR 232 FM JUST WEST OF CRAWFORD CK TO CR 223
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 0000809
FuND:STP 1.4212.29
PE: 2001 ROW: CST:
$4 15,000 AFTER 2003 AFTER 2003
PROJECT: 231710- TYPE WORK: MEDIAN WORK
FUND: STP .
AUGUSTATMATIP#STP-19
LENqTH(mileslkm) 4.7117.58
DESCRPT: SR 104/WASHINGTON RD FM FLOWING WELLS RD TO HALALI FARM RD
PE: 2003 ROW: CST:
$447,000 AFTER 2003 AFTER 2003
.
PROJECT: 232306- TYPE WORK: REPLACE.BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.22 10.35
DESCRPT: SR 223 @ UCHEE CREEK 2.2 MI NW OF GROVETOWN
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 250470- TYPE WORK: WIDENING
FUND: STP
AUGUSTA TMA TIP #~STP-5
LENGTH (miles I km) 2.55 14.1 I
DESCRPT: OLD PETERSBURG RD/OLD EVANS FM BASTON RD TO WASHINGTON RD; R
EXIST. LANES: 02 PROPOSED LANES: 04 '
ASSOCIATED PROJECTS: 25R470-
PROJECT: 25056X- TYPE WORK: WIDENING
FUND: STP
AUGUSTA TMA TIP# STP-T2-5
LENGTH (mileslkm) 010.00'
DESCRPT: DAVIS RD FM SCOTT NIXON BLVDIRICHMOND TO WASHINGTON ROAD
sxisr. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 250560-
\
PROJECT: 25R470- TYPE WORK: WIDENING
FUND: STP
AUGUSTA TMA TIP # STP-5
LENGTH (miles I km} 2.55 14.11
DESCRPT: OLD PETERSBURG RD/OLD EVANS FM BASTON TO WASHINGTON-250470
:f
0> .
~_:"
EXIST. LANES: 02 PROPOSED LANES: 05 ASSOCIATED PROJECTS: 250470-
PE: 1992 ROW: 2002 CST:
UNDERWAY $1,400,000 AFTER 2003
PE:NONE ROW: LOCL CST: NONE
PE: 1992 ROW: 2002 CST: NONE
UNDERWAY $ I6,850,000
Page 100 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
- _. ., - ._,..._----. . . . =-----_-...""'~-,...-.._~
9121100
""-"--..;...--------_.~_._-----
COLUMBIA COUNTY
PROJECT: 262080- TYPE WORK: WIDENING
FUND: STP
AUGUSTATMATIP# STP-13
LENGTH (miles 1 km) 2.29/3.69
DESCRPT: SR 104 FM CR 91/HALALI FARM RD TO E/CR 5 I5 (INCL BRIDGES)
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 2003 CST:
UNDERWAY $1,995,000 AFTER 2003
PROJECT: 811062- TYPE WORK: WEIGHSTATION
FUND: 1M
LENGTH (miles 1 km) 010.00
DESCRPT: UPGRADE 1-20 EB AND WB WEIGH STATIONS INCL SCALE REPLACEMENT
PE: 1995 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $75,000
$8,000,000 $7,200,000
$800,000
j~
:~-_. :,.'
Page 10J of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
COOK COUNTY
PROJECT: 0000764 TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: 1-75 FM SR 37 TO CR 246/KINARD BRIDGE RD - PHASE 2 EXIST. LANES: 06 PROPOSED LANES: 08
FUND: NHS 9.3 114.97
PE: 1993 ROW: 2002 CST:
UNDERWAY $5,421,000 AFTER 2003
PROJECT: 0000765 TYPE WORK: WIDENING LENGTH (mileslkm)
DESCRPT: 1-75 FM CR 246/COOK TO CR 204 IN TIFT CO - PHASE 2 EXIST. LANES: 06 PROPOSED LANES: 08
FUND: NHS 9.8/15.78
PE: 1993 ROW: 2002 CST:
UNDERWAY $4,372,000 AFTER 2003
PROJECT: 410420- TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles I km) 0.6/0.97
DESCRPT: 1-75 @ SR 37/ADEL [FM 1500 FT WEST TO 650 FT EAST 1-75]
EXIST. LANES: 02 PROPOSED LANES: 05
PE: 1992 ROW: 2001 CST:
UNDERWAY $6,164,000 AFTER 2003
PROJECT: 410530- TYPE WORK: WIDENING
FUND: NHS
PE: 1993
UNDERWAY
LENGTH (miles r km) 9.8/15.78
ROW: NONE
DESCRPT: 1-75 FM CR 246/COOK TO CR 204 IN TIFT CO - PHASE IIX
CST: 2003
$29,233,000
EXIST. LANES: 04 PROPOSED LANES: 06 ASSOCIATED PROJECTS: 41053X-
FED Share: GA Share:
$23,386,400
$5,846,600
.
PROJECT: 442990- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.27/0.43
DESCRPT: SR 37 @ WITHLACOOCHEE RIVER O/F APP 6 MI E OF ADEL
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
5e.:
~.:.~":.,,
Page 102 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
COWETA COUNTY
PROJECT: 0000091 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: COWETA COUNTY BIKE NETWORK
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000092 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: NEWNAN TEMPLE/CLARK CORRIDOR IMPROVEMENT & LANDSCAPING
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTR Share:
PROJECT: 0000569 TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE:LOCL
LENGTH (miles / km) 0/0.00
ROW: LOCL
DESCRPT: SENOIA MULTI-USE TRAIL FROM CITY PARK TO BALL FIELD
CST: 2001
FED Share:
PROJECT: 0000818 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR 16 AT SR 74/SR 85 IN SENOIA LUMP SUM PROJECT
FUND: STP 0.57 / O. 92
OTRShare:
PE: 2001 ROW: 2002 CST: 2002
reo ss.o
GA Share:
$100,000 $80,000
$20,000
$500,000 $400,000 $100,000
$342,000 $274,000
$68,000 $10,000 $79,000 $282,000 $253,800 $28,200
PROJECT: 0000930 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR I4/US 29 AT CR 33/WELDON ROAD LUMP SUM PROJECT
FUND: STP 0.49/ O. 79
PE: 2001
ROW: LOCL CST: 2003
reo sns-
GA Share:
$21,000
$381,000 $342,900
$38,100
PROJECT: 3 I 1790- TYPE WORK: RAMP
FUND: 1M
LENGTH (miles / km) 0.2 /0.32
DESCRPT: I-85/SR 34 RAMP RECONSTRUCTION SOUTHEAST QUADRANT
EXIST. LANES: 00 PROPOSED LANES: 01
PE:1995 ROW: 2002 CST:
UNDERWAY $1,601,000 AFTER 2003
PROJECT: 322060- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 2.25/3.62
DESCRPT: SR 54/34 FM FISCHER CROSS ROAD TO SR 74 /& FAYETTE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 32206X- 322065-
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $1,806,000 $4,000,000 $3,200,000
$800,000
. Lf;
PROJECT: 322063- TYPE WORK: BRIDGE REHAB LENGTH (miles / km)
DESCRPT: SR 54 OVER LINE CREEK/ALSO FAYETTE CO EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 32206Z- 322060-
FUND: BRIDGE
PE: 1992
0.42/0.68
ROW: NONE
CST: 200)
FED Share:
GA Share:
UNDERWAY
$851,000 $680,800 $170,200
Page 103 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
._----,------_."._----_._.~ . ._,- __9/21/00 --------- _._--- ._--~---_.
COWETA COUNTY
PROJECT: 322340- TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR 34 E/NEWNAN FM SR 154 TO FISCHER RDICR 552 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 322345- 32Y340-
FUND: STP 3.86/6.21
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $9,731,000 $4,731,000 $3,784,800
$946,200
PROJECT: 322345- TYPE WORK: BRIDGE REHAB LENGTH (miles 1 km)
DESCRPT: SR 34 @ SHOAL CREEK EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 322340-
FUND: BRIDGE
PE: 1992
0.2/0.32
ROW: NONE
CST: 2003
FED Share:
GA Share:
UNDERWAY
$968,000 $774,400 $193,600
PROJECT: 322800- TYPE WORK: NEW CONSTRUCTION
FUND: STP .
LENGTH (miles r km) 6.2/9.98
DESCRPI:: NEWNAN SOUTHWEST BYPASS FM SR 34 TO SR 14 AT SR 16
EXIST. LANES: 00 PROPOSED LANES: 02
PE: 2001 ROW: CST:
$1,000,000 AFTER 2003 AFTER 2003
PROJECT: 333120- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
PE: 1999
UNDERWAY
LENGTH (mileslkm) 0.2/0.32
ROW: LOCL
DESCRPT: SR 14/US 29/27 ALT AT CR 201lEAST CAMP STREET
CST: 2001
$331,000
LUMP SUM PROJECT
FED Share: GA Share:
$297,900
$33,100
..
PROJECT: 343495- TYPE WORK: INTERSECTION IMPROVEMENT
.' .
LENGTH (miles 1 km)
DESCRPT: SR 154 AT RAYMOND HILL RD/CR 32 JUST SOUTH OF 1-85
LUMP SUM PROJECT
FUND: STP 0.2 10.32
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$136,000 $122,400
$13,600
PROJECT: 371306- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles 1 km) , 0.32 10.52
ROW: LOCL
DESCRPT: CR 211HAPPY VALLEY CIRCLE @ BROWNS CREEK 6 MI N OF NEWNAN
CST: 2001
FED Share:
ASSOCIATED PROJECTS: 371332-
GA Share:
UNDERWAY
$361,000 $288,800
$72,200
PROJECT: 371331- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (mileslkm) 0.12/0.19
ROW: LOCL
DESCRPT: CR 91/MCINTOSH TRAIL@SOU. RR (718851J) W OF SHARPSBURG
CST: 2001
FED Share:
GA Share:
UNDERWAY
$363,000 $290,400
$72,600
~;
~
~::.~;~_.
PROJECT: 3.71332- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
. PE: 1999
LENGTH (miles 1 km) 0.42 10.68
ROW: LOCL
DESCRPT: CR 14/JIM STARR ROAD @ CEDAR CREEK 6 MI N OF NEWNAN
CST: 2001
FED Share:
ASSOCIATED PROJECTS: 371306-
GA Share:
UNDERWAY
$377,000 $301,600
$75,400
Page 104 0/336
STATE TRANSPORTATiON IMPROVEMENT PROGRAM
9/21/00
COWETA COUNTY
PROJECT: 371333- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.25 /0.40
ROW: LOCL
DESCRPT: CR 201/BETHLEHEM CH. ROAD @ NEW RIVER 3.5 MI S OF NEWNAN
CST: 2001
FED Share:
GA Share:
UNDERWAY
$321,000 $256,800
$64,200
PROJECT: 371334- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.25 /0.40
ROW: LOCL
DESCRPT: CR 227/GRANDMA BRANCH RD. @ NEW RIVER 2.5 M NW OF GRANTVILLE
CST: 2001
FED Share:
ASSOCIATED PROJECTS: 371335-
GA Share:
UNDERWAY
$363,000 $290,400
$72,600
PROJECT: 371335-' TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.25 /0.40
ROW: LOCL
DESCRPT: CR 227/GRANDMA BRANCH RD. @ NEW RIVER TRIB. NW OF GRANTVILLE
CST: 2001
FED Share:
ASSOCIATED PROJECTS: 371334-
GA Share:
UNDERWAY
$299,000 $239,200
$59,800
PROJECT: 371336- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.25 /0.40
ROW: LOCL
DESCRPT: CR 25/0LD ATLANTA HWY @ WAHOO CREEK N OF NEWNAN
CST: 2001
FED Share:
GA Share:
UNDERWAY
$419,000 $335,200 $83,800
;:
"
PROJECT: 371337- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
UNDERWAY
LENGTH (miles / km) 0.25 /0.40
ROW: LOCL
DESCRPT: CR 14/BRIMER ROAD @ CEDAR CREEK 6 MI N OF NEWNAN
CST: 2001
$438,000
FED Share:
$350,400
GA Share:
$87,600
"
L .s.
~~.
Page 105 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
..--""-_ _' :024_.
,_,.
. 9/21/00
~_.
......._~__._,
"""" .__
CRA WFORD COUNTY
PROJECT: 363130- TYPE WORK: WIDENING
FUND: STATE
LENGTH(mileslkm) 9.8/15.78 DESCRPT: SR 96 FM E OF FLINT RIV TO FT VALLEY BP/SR 49C & BRIDG/PEACH EXIST. lANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 36313X- 36Y 130-
PE: 1992 ROW: 2001 CST: 2001
GA Share:
UNDERWAY $1,019,000 $17,604,000
$17,604,000
PROJECT: 36Y 130- TYPE WORK: WIDENING
FUND: BRIDGE
PE:NONE
LENGTH (miles 1 km) 0/0.00 '
ROW: NONE
DESCRPT: SR 96 AT MACOMIS CREEK - FOR BR FUNDING; SEE 363130 . EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 363130-
CST: 2001 FED Shure:
GA Shure:
$500,000 $400,000 $100,000
..
..
-;
Page J06 of336
STATE TRANSPORtATION IMPROVEMENT PROGRAM
---,-_ ------_.---_.-------_ .. 9/21/00 _-----------"--._._~._~,-_._-_ .....
.
..:.:
FUND:NHS
PE:NONE
0/0.00
ROW: NONE
CST: NONE
PROJECT: 410260- TYPE WORK:' WIDENING
FUND: NHS
LENGTH (miles / km) 6.9/11.11
DESCRPT: 1-75 FM SR 300 TO DOOL Y COUNTY LINE & 41 R260 FOR HPP RlW $
EXIST. LANES: 04 PROPOSED LANES: 08
ASSOCIATED PROJECTS: 41R260-
PE: 1986 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $1,457,000 $14,300,000 $11,440,000 $2,860,000
PROJECT: 41R260- TYPE WORK: WIDENING
FUND: HPP
LENGTH (miles / km) 11.9/19.13
DESCRPT: 1-75 FM SR 300 TO DOOLY COUNTY LINE - FOR HPP RlW $1410260
EXIST. LANES: 04 PROPOSED LANES: 08
ASSOCIATED PROJECTS: 410260-
PE: 1986 ROW: 2001 CST: NONE
UNDERWAY $10,312,000
. PROJECT: 450550- TYPE WORK: BRIDGES
FUND: STP
LENGTH (miles / km) 0.31 /0.50
DESCRPT: 24th AVENUE/SR 987 GRADE SEPARATION AT NORFOLK SOUTHERN RR
PE: 1998 ROW: 2002 CST:
UNDERWAY $700,000
AFTER 2003
PROJECT: 471427- TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: STREETSCAPES IN THE CITY OF CORDELE
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
$250,000 $200,000
'$50,000
Page 1070[336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
DADE COUNTY
PROJECT: 0000136 TYPE WORK: LANDSCAPING
FUND: STP
CHAITANOOGA TMA TIP #
LENGTH (miles / km) 0/0.00
DESCRPT: LOOKOUT MOUNTAIN PARK WAY SCENIC OVERLOOKJSR 189
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 610990- TYPE WORK: REPLACE BRIDGE
CHATTANOOGA TMA TIP # IM-97-8
LENGTH (miles / km)
DESCRPT: 1-24/1-59 INTERCHANGE - THREE BRIDGES
FUND: 1M 0 /0.00
OTHShare:
PE: ]995 ROW: NONE CST: 2001 FED Share: GA Share:
$125,000 . $100,000
$25,000
UNDERWAY
$4,118,000 $3,706,200
$41 ],800
PROJECT: 611020- TYPE WORK: WIDENING
CHATTANOOGA TMA TIP # NH-24-01
. LE(VGTH (mileslkm)
DESCRPT: 1-24/SR 409 FROM I-59 TO TENNESSEE STATE LINE
EXIST. LANES: 04 PROPOSED LANES: 06
FUND: NHS 3.27/5.26
PE: 1998 ROW: NONE . CST: 2003 FED Share: GA Share:
UNDERWAY
$7,150,000 $5,720,000 $1,430,000
PROJECT: 611080- TYPE WORK: INTERCHANGE
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: 1-591SR 406- NEW INTERCHANGE AT HICKS HOLLOW ROAD (CR 271)
PE: 1999 ROW: 2003
CST:
UNDERWAY $3,000,000 AFTER 2003
PROJECT: 621230- TYPE WORK: WIDENING .
FUND: STP
LENGTH (miles 1 km) 0.8 /1.29
DESCRPT: SR 136 FM CR 52 TO SR 58/US II {INCLUDE INT W/I-59}/621230IY
EXIST. LANES: 02 PROPOSED LANES: 05
ASSOCIATED PROJECTS: 62Y230-
PROJECT: 62Y230- TYPE WORK: WIDENING
FUND: 1M
LENGTH (miles / km) 010.00
DESCRPT: SR 136 FM CR 52 TO SR 58 {FOR 1M $ FOR INT W/I-59} /621230jY
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 621230-
. PE: 1992 ROW: 2003 CST:
UNDERWAY $410,000
AFTER 2003
PE:NONE ROW: 2003 CST:
$100,000 AFTER 2003
Page J08 0/336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
----_._---_._---------- 9/21/00 ------------------
DAWSON COUNTY
PROJECT: 0000202 TYPE WORK: TURN LANES
FUND: STP
LENGTH (mileslkm) 0.37/0.60
DESCRPT: SR 53 AT BLUE RIDGE OVERLOOKICR 195 & WAR HILL PARK RD/CR218
L UMP SUM PROJECT
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$194,000 $174,600
$19,400
PROJECT: 0000316 TYPE WORK: SAFETY LENGTH (miles 1 km)
DESCRPT: SR 52 HORIZONTAL CORRECTION @ MP 6.4 TO 6.6
FUND:STP 0.2/0.32
PE: 2003 ROW: CST:
$270,000 AFTER 2003 AFTER 2003
PROJECT: 132790- TYPE WORK: INTERCHANGE LENGTH (miles 1 km)
DESCRPT: SR 400 INTERCHANGE AT SR 53
FUND:APD 0.5/0.81
PE: 1998 ROW: 2002 CST:
UNDERWAY $15,000,000 AFTER 2003
"" ,
"
Page 109 of336
STATE TRANSPORTATIONIMPROVEMENT PROGRAM
.
..
'_''_K'
9/21/00
,..
,_ _ __ """,...-
_
DECATUR COUNTY
PROJECT: 0001236 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.1 /0.16
DESCRPT: SR 253/SPRING CREEK RD AT SR I1US 27/BAINBRIDGE BYP NB RAMP
LUMP SUM PROJECT .
.PE: 2001 ROW: NONE CST: 2002 FED Share: GA Share:
$5,000
$83,000 . $74,700
$8,300
PROJECT: M000346 TYPE WORK: SHOULDER WORK LENGTH (miles / km)
DESCRPT: SR 309 FM FLORIDA STATE LN TO N OF CR 490 LUMP SUM PROJECT.
FUND: STP 13.8122.25
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$1,262,000 $1,009,600
$252,400
Page 110 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
- - - - .....- . - -........- - .
,...'~
',"_..........-
"'~ _ _\'i _ _,
.. _ _" ' _ ~ _ m '
_
DEKALB COUNTY
,"
PROJECT: 0000172 TYPE WORK: BICYCLE/PED. FACILITY
FUND:STP
PE:LOCL
ATLANTA TMA TIP # DK AR BP039
LENGTH (miles I km) 010.00
ROW: LOCL
DESCRPT: CHAMBLEE STREETSCAPE PHASE 2
CST: 2001
FED Share:
$350,000 $280,000
PROJECT: 0000173 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # DK AR BP040
LENGTH (miles I km)
DESCRPT: STONE MOUNTAIN/ATLANTA TRAIL PHASE 3
FUND:STP 010.00
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$70,000
$1,200,000 $960,000
PROJECT: 0000174 TYPE WORK: LANDSCAPING
ATLANTA TMA TIP # DK AR BP041 ,
LENGTH (miles I km)
DESCRPT: MURPHEY CANDLER LAKE RESTORATION
FUND:STP 010.00
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$240,000
$1,500,000 , $1,200,000
PROJECT: 0000176 TYPE WORK: HISTORIC PRESERVATION
ATLANTA TMA TIP # DK AR BP042
LENGTH (miles I km)
DESCRPT: OLD DECATUR RAILROAD DEPOT REHABILITAnON
FUND:STP 010.00
OTH Share:
PE:LOCL' ROW: LOCL CST: 2001 FED Share:
$300,000
$283,OQO $226,000
PROJECT: 0000177 TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # DK AR BP043
LENGTH (miles I km)
DESCRPT: DECATUR DOWNTOWN STREETSCAPE PHASE 3
ASSOCIATED PROJECTS: 771224-
FUND:STP 010.00
PROJECT: 0000178 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # DK AR BP044
LENGTH (miles I km) 0 10.00
DESCRPT: ATL PED INTERSECT IMP/STSCAPING/DUNNWOODY MARTA/PER MALL
OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$57,000
$1,500,000 $1,200,000
$300,000-
$1,200,000 $960,000
PROJECT: 0000204 TYPE WORK: LANDSCAPING
FUND: STP
ATLANTATMA TIP # DKARBP045
LENGTH (mileslkm) 0/0.00
DESCRPT: DECATUR MLK JR HARMONY PARK/OAKHURST BUSINESS DISTRICT
OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$240,000
$79,000 $63,000
PROJECT: 0000374 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: 1M
ATLANTA TMA TIP # AR 130P
LENGTH (miles I km) 0 10.00
DESCRPT: 1-285/1-20 INTERMEDIATE SOLUTION TO REDUCE TRUCK OVERTURNING
~:.",.
OTH Share:
PE: 2000 ROW: NONE CST: 2001 FED Share: 'GA Share:
$16,000
UNDERWAY
$1,500,000 $1,350,000
$150,000
Page I JJ of336
,
. ,_ _'
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. . . . . . . ; ._ _0. _ _. _
.0. . . . . ,_~~, 9/Q2_.1/00
.
.
DEKALB COUNTY
PROJECT: 712870- TYPE WORK: INTERCHANGE
FUND: DEMO
ATLANTA TMA TIP # DK AR059A
LENGTH (miles / km) 3.5/5.64
DESCRPT: 1-20 @LITHONIA INDUSTRIAL BLVD & 71Y870 FOR OTH $
PE: 1992 ROW: 1998 CST: 2003
EXIST. LANES: 00 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 71Y870-
GA Share:
_
UNDERWAY UNDERWAY
$800,000 $640,000 $160,000
PROJECT: 713220- TYPE WORK: INTERCHANGE
FUND: 1M
ATLANTA TMA TIP # DK AR 182A
LENGTH (miles / km) 1.4 /2.25
DESCRPT: 1-20 @ WESLEY CHAPEL RD & RELOC FRONTAGE RD{ SNAPFINGER}
PE: 1995 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $3,910,000 $6,591,000 $5,931,900
$659,100
PROJECT: 713250- TYPE WORK: INTERCHANGE
FUND: 1M
ATLANTA TMA TIP # DK AR 183
LENGTH (miles / km)
I /1.61
DESCRPT: 1-285 SOUTH AUXILLARY LN FM SR 8 TO STN MTN FWY & FWY BRIDGE
ASSOCIATED PROJECTS: 713320-.
PE: 1995 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$2,543,000 $2,288,700
$254,300
PROJECT: 713280- TYPE WORK: INTERCHANGE
FUND: 1M
ATLANTA TMA TIP # DK AR 205
LENGTH (miles / km) 0/0.00
DESCRPT: 1-285 @ SR 10/MEMORIAL DR & RELOCATE GEORGE LUTHER DR
EXIST. LANES: 04 PROPOSED LANES: 06
PE: 1997 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $17,487,000 $10,228,000 $9,205,200
$1,022,800
PROJECT: 713290- TYPE WORK: INTERCHANGE
ATLANTA TMA TIP # DK AR 206
LENGTH (miles / km)
DESCRPT: 1-285@SR I55/FLAT SHOALS ROAD
EXIST. LANES: 04 PROPOSED LANES: 06
FUND: 1M 0.2 /0.32
PE: 1999 ROW: 2001 CST:
UNDERWAY $1,150,000 AFTER 2003
/
PROJECT: 713300- TYPE WORK: INTERCHANGE
ATLANTA TMA TIP # DK AR 207
. LENGTH (miles / km)
DESCRPT: 1-285 @ BOULDERCREST ROAD
EXIST. LANES: 04 PROPOSED LANES: 06
FUND: 1M 0/0.00
PE: 1998 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $1,150,000
$18,400,000 $16,560,000
$1,840,000
PROJECT: 713320- TYPE WORK: INTERCHANGE,
ATLANTA TMA TIP# DKAR 184
LENGTH (miles/km)
DESCRPT: 1-285 @ SR 8/US 29/LA WRENCEVILLE HIGHWAY
EXIST. LAN~S: 04 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 713250-
FUND: 1M 0.7/1.13
PE: 1995 ROW: 2002 CST:
UNDERWAY $6,847,000 AFTER 2003
f .'
~i~/
PROJECT: 713373- TYPE WORK: ATMSIITS
FUND:CMAQ
PE:2000
ATLANTA TMA TIP # AR 281
LENGTH (miles / km) 12.5 120.11
ROW: NONE
DESCRPT: ATMS/I-285 SURVEIL FM 1-75/CLAYTON NE THRU FULTN TO 1-20/DEK
CST: 2001
FED Share:
ASSOCIATED PROJECTS: 71337Z-
GA Share:
$5,000
$6,300,000 $5,040,000 $1,260,000
Page Jl2 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
DEKALB COUNTY
PROJECT: 713410- TYPE WORK: ATMS/ITS
FUND: CMAQ
'ATLANTA TMA TIP # DK AK 215A
LENGTH (miles/km) 17.5/28.09.
DESCRPT: ATMS: 1-285 COMM/SURVEIL FM S OF FLAT SHOALS TO 1-85 N
PE.NONE ROW: NONE CST: 2001
FED Share:
GA Share:
$10,045,000 $8,036,000 $2,009,000
PROJECT: 714000- TYPE WORK: INTERCHANGE
ATLANTATMA TIP#DKAR219
LENGTH (miles Zkm)
DESCRPT: '1-285 @ ASHFORD DUNWOODY ROAD
EXIST. LANES: 04 PROPOSED LANES: 06
FUND: 1M 0.5/0.81
PE:NONE ROW: 2001 CST: 2003 FED Share: GA Share:
$7,000,000 $30,000,000 $27,000,000
$3,000,000
PROJECT: 714110- TYPE WORK: BARRIERS
FUND: NHS
ATLANTA TMA TIP # AR 303
LENGTH (miles / km) 3.11 /5.01
DESCRPT: 1-20 NOISE BARRIERS FM FLAT SHOALS ROAD TO COLUMBIA DR (N&S)
PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$3,000,000 $2,400,000
$600,000
PROJECT: 71Y870- TYPE WORK: INTERCHANGE
FUND: OTHER
PE: 1992
ATLANT A TMA TIP # DK AR 059B
LENGTH (miles / km) 0/0.00
ROW: 1998
DESCRPT: 1-20 @L1THONIA INDUSTRIAL BLVD - FOR OTHER $ISEE 712870
CST: 2003
EXIST. LANES: 00 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 712870-
GA Share:
UNDERWAY UNDERWAY $32,086,000 $25,668,800
$6,417,200
PROJECT: 721405- TYPE WORK~' REPLACE BRIDGE ,
ATLANT A TMA TIP # DK 022B
LENGTH (miles / km)
DESCRPT: ASHFORD-DUNWOODY RD @NANCY CRK & 72Y405-
ASSOCIATED PROJECTS: 72Y405-
FUND: BRIDGE
PE: 1992
0.52 /0.8:t
ROW: LOCL
CST: 2001
FED Share:
GA Share:
UNDERWAY
$1,188,000 $950,400 $237,600
PROJECT: 721820- TYPE WORK: WIDENING
FUND: STP
ATLANTA TMA TIP # DK 056
LENGTH (miles / km) 1.4 /2.25
DESCRPT: SNAPFINGER RD FM WESLEY CHAPEL RD TO S OF RIDERS TRAIL
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2001 ROW: NONE CST:
$117,000 AFTER 2003
PROJECT: 722145- TYPE WORK: ATMSIITS
FUND:NHS'
ATLANTA TMA TIP # AR 306
LENGTH (miles / km) 5.52/8.89
DESCRPT: ATMS/SRI41 COMM/SURVEIL FM 1-285 TO SPALDING DRiGWINNETT
ASSOCIATED PROJECTS: 72214X-
PE: 2001 ROW: NONE CST: 2002 FED Share: GA Share:
$200,000
$5,032,000 $4,025,600 $1,006,400
~
~:..
.
~~;;;::
PROJECT: 731500- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # DK 254
LENGTH (miles / km) 0.23 /0.37
DESCRPT: SR 42/BRIARCLIFF ROAD AT SHERIDAN ROAD/CR 139
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$703,000 $632,700.
$70,300
Page 1130/336
.... r--------------------~~~,.,~~
tt _ _. - ' ,_ _ lSI'a
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. - -_ _,_.". '
- - - - - - _ 9/21/00
_ .. o _ o ,
_
.. ----,------,
DEKALB COUNTY
PROJECT: 731770- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: HPP
ATLANTA TMA TIP # DK 266
LENGTH (miles 1 km) 8.281 13.33
DESCRPT: BUFORD HIGHWAY/SR 13/US 23 ARTERIAL ENHANCEMENTS
PE: 1999 ROW: NONE CST: 2001 FED Share:
UNDERWAY
$1,312,000 $1,050,000
OTH Share:
PROJECT: 75 I 320- TYPE WORK: REPLACE BRIDGE
ATLANTA TMA TIP # DK 101
LENGTH (mileslkm)
DESCRPT: CR 5 I89/ROCKBRIDGE RD@ SNAPFINGER CREEK
FUND: BRIDGE
PE: 1991
0.28/0.45
ROW: LOCL
CST: 2001
FED Share:
GA Share:
$262,000
UNDERWAY
$1,150,000 $920,000 $230,000
PROJECT: 75287X TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # AT 163
LENGTH (mileslkm) 0/0.00
DESCRPT: SR 154/MEMORIAL DRIVE AT MORELAND AVE - SEE FULTON CO
ASSOCIATED PROJECTS: 752870-
.PE:NONE ROW: NONE CST: NONE
PROJECT: 752880- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANT A TMA TIP # AT 164
LENGTH (miles1 km) 0.42 /0.68
DESCRPT: SR I 54/MEMORIAL DRIVE AT SR I 55/CANDLER ROAD
PE: 1997 ROW: 2000 CST: 2001 FED Share: GA Share:
. UNDERWAY $2,576,000 $225,000 $180,000 $45,000
PROJECT: 752900- TYPE WORK: REPLACE BRIDGE
FUND: STP
ATLANT A TMA TIP # DK 250 .
LENGTH (miles 1 km) 0.2 /0.32
( DESCRPT: SR I 55/CANDLER RD AT SHOAL CKJREPL CL VT;TRN LN&REMOVE PED BR
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1996 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $744,000 $670,000 $536,000 $134,000
PROJECT: 752930- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
. PE: 1999
ATLANTA TMA TIP # DK 260
LENGTH (miles1 km) 0.2 /0.32
ROW:.LOCL
DESCRPT: BOULDERCREST ROAD AT THE SOUTH RIVER SOUTH OF 1-285
CST: 2001
FED Share:
GA Share:
UNDERWAY
$1,528,000 $1,222,400
$305,600
PROJECT: 752940- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # DK 258
LENGTH (miles / km) 0.2/0.32
ROW: LOCL
DESCRPT: CR 5 194/FLAT SHOALS ROAD @ DOLITTLE CREEK JUST SOUTH OF 1-20
CST: 2002
FED Share:
. GA Share:
UNDERWAY
$633,000 $506,400 $126,600
{ ::; :~!
~';:':.
PROJECT: 752950- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # DK 259'
LENGTH (mileslkm) 0.21/0.34
ROW: LOCL
DESCRPT: CR 3271/MERCER UNIV. DRIVE @ N FORK PEACHTREE CREEK
CST: 2002
FED Share:
GA Shure:
UNDERWAY'
$404,000 $323,200
$80,800
Page 114 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
_ _ _ _ - . - - - - - - - - - - - - - - - - - - - - - - - - -_ _ _ _. _ .
....--,
DEKALB COUNTY
PROJECT: 753030- TYPE WORK: TURN LANES
ATLANTA TMA TIP # DK 261
LENGTH (miles / km)
DESCRPT: PANOLA RD/CR 5150 AT ROCK SPRINGS RD
FUND: STP 0.2 /0.32
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 753035- TYPE WORK: TURN LANES
ATLANT A TMA TIP # DK 246
LENGTH (miles / km)
DESCRPT: EAST PONCE DE LEON/CR 5151 AT HAMBRICK RD
FUND: STP 0.2 /0.32
OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
PROJECT: 753045- TYPE WORK: TURN LANES
FUND: STP
ATLANTATMA T1P# DK239
LENGTH (miles/km) 0.2/0.32
DESCRPT: TILLY MILL W/CR 1698 AT NORTH PEACHTReE/PEELER RD
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 753170- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: HPP
ATLANT A TMA TIP # DK 268
LENGTH (miles / km) 0/0.00
DESCRPT: SR I55/CANDLER ROAD MAJOR ARTERIAL ENHANCEMENTS
OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
';.'
:
:~~".I' PROJECT: 753200- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: HPP
ATLANTA TMA TIP # DK 267
LENGTH (miles / km) 0/0.00
DESCRPT: SR I 54/SR 10/MEMORIAL DRIVE MAJOR ARTERIAL ENHANCEMENTS
OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
PROJECT: 753265- TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # DK 273
LENGTH (miles / km)
DESCRPT: EAST PONCE DE LEON AVE @ MCCLENDON DR
FUND: STP 0/0.00
OTH Share:
PE: LOCL ROW: LOCL CST: 2003 FED Share:
PROJECT: 753290- TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # DK 274
LENGTH (miles / km)
DESCRPT: SR 236/LAVISTA RD AT BRIARCLIFF RD/CR 1532
FUND: STP 0.2 /0.32
OTHShare:
PE:LOCL ROW: LOCL CST: 2003 FED Share:
OTH Share:
.
IteJ
PROJECT: 76247X- TYPE WORK: VEHICLE PURCHASES
FUND: CMAQ
ATLANTA TMA TIP # M AR 237B
LENGTH (miles / km) 0/0.00
DESCRPT: MARTA INTELLIGENT TRANS SYSTEM(FLEET AVLS)ISEE FULTON 762472
ASSOCIATED PROJECTS: 762472-
PE:NONE ROW: NONE CST: NONE
'0'41:.'"
$450,000 $360,000
$90,000 UNDERWAY
$900,000 $720,000 $180,000
$600,000 $480,000 $120,000 UNDERWAY $10,146,000 $8,117,000 $2,029,000 UNDERWAY $10,885,000 $8,708,000 $2,177,000
$75,000 $60,000 $15,000
$75,000 $60,000 $15,000
Page 115 0/336
STATE TMNSPORTATIONIMPROVEMENTPROGRAM
9/21/00
DEKALB COUNTY
PROJECT: 762500- TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # DK AR BP022
LENGTH (miles I km)
DESCRPT: TILLY MILL RD FM MT VERNON TO PEELER RD
FUND: STP 010.00
PE: 1999 ROW: LOCL CST: 2001 FED Share:
UNDERWAY
$880,000 $704,000
PROJECT: 762502- TYPE WORK: SIDEWALKS
ATLANT A TMA TIP # DK AR BP021
LENGTH (miles I km)
DESCRPT: SR 260/GLENWOOD AVE FM 1-20 TO EAST LAKE RD
FUND: STP 010.00
OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
$176,000 UNDERWAY
$510,000 $408,000
OTHShare:
PROJECT: 762611- TYPE WORK: SIDEWALKS
FUND: CMAQ
PE:LOCL
ATLANTA TMA TIP # DK AR BP038
LENGTH (miles I km) 2.5 14.03
ROW: LOCL
DESCRPT: PERIMETER AREA AROUND DUNWOODY MA~TA' STATION
CST: 2001
FED Share:
$1'02,000 .
$500,000 $400,000
OTHShare:
PROJECT: 770911- TYPE WORK: SIDEWALKS
FUND:CMAQ
PE: 1995
ATLANTA TMA TIP # DK AR 165CDE
. LENGTH (miles I km) 3.99 16.42
ROW: NONE
DESCRPT:
SIDEWALKS AT BUFORD HWY- NEW
PEACHTREE RD. &.
SHALLOWFORD RD.
'
CST: 2001
.
FED Share:
$100,000 UNDERWAY
$316,000 $253,000
OTHShare:
PROJECT: 770912- TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # DK AR 165AB
LENGTH (miles I km)
DESCRPT: SIDEWALKS AT BRIAR WOOD ROAD & DRESDEN ROAD
FUND: CMAQ
PE: 1995
1.21 11.95
ROW: NONE
CST: 2001
FED Share:
$63,000 UNpERWAY
$96,000 $77,000
OTH Share:
$19,000
PROJECT: 771170- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # DK f55
LENGTH (miles I km) 0.21 10.34
ROW:LOCL .
DESCRPT: CR 1644/BRIARWOOD ROAD @NORTH FORK P'TREE CREEK N OF 1-85
CST: 2002
FED Share:
GA Share:
UNDERWAY
$350,000 $280,000
$70,000
PROJECT: 771180- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # DK 256
LENGTH (miles I km) 0.19 10.31
ROW: LOCL
DESCRPT: CR 164/ELLINGWOOD DRIVE @CONLEY CREEK NEAR PANTHERSVILLE RD
CST: 2002
.FED Share:
GA Share:
UNDERWAY
$187,000 $149,600 $37,400
PROJECT: 771190-. TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # DK 257
LENGTH (mileslkm) 0.21/0.34
ROW: LOCL
DESCRPT: CR 1563/FLOWERS ROAD @ NORTH FORK P'TREE CREEK NEAR MERCER U
CST: 2002
FED Share:
GA Share:
UNDERWAY
$429,000 $343,200
$85,800
Page 116 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
- - - , - - - - - - - - - - - - - - - - - - - - --""~._""-------------------
9/21/00
DEKALB COUNTY
PROJECT: 771222- TYPE WORK: LANDSCAPING
FUND: STP
ATLANTA TMA TIP # OK 262
LENGTH (miles /km) 1.89/3.04
PE:LOCL ROW: LOCL
DESCRPT: CHAMBLEE-DUNWOODY RD FROM NEW P'TREE RD TO BUFORD HWY/SR 13
CST: 2001
FED Share:
$1,250,000 $1,000,000
OTH Share:
PROJECT: 771224- TyPE WORK: LANDSCAPING
ATLANTA TMA TIP # OK 264
LENGTH (miles r km)
FUND: STP 0/0.00
DESCRPT: DOWNTOWN DECATUR STREETSCAPES & SIDEWALKS PHASE II
ASSOCIATED PROJECTS: 0000177
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 7V7043- TYPE WORK: CAPITAL
ATLANTA TMA TIP # OK 2 IOD
LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$250,000
$1,250,000 $1,000,000
$250,000
$105,000 $105,000
$27,000
PROJECT: MOOOl76 TYPE WORK: RESURFACE & MAINTENANCE
ATLANTA TMA TIP # AR 130H
LENGTH (miles / km)
DESCRPT: SR 155 FM SNAPFINGER ROAD TO MEMORIAL DR
LUMP SUM PROJECT
FUND: STP 4.22/6.79
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$2,714,000 $2,171,200
$542,800
PROJECT: TOOOOI3 TYPE WORK: CAPITAL
ATLANTA TMA TIP # OK 21 OD
LENGTH (miles / km)
DESCRPT: FY 2002 DEKALB COUNTY SECTION 5310
FUND: T.RANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$110,000 $110,000 $28,000
PROJECT: T000023 TYPE WORK: CAPITAL
ATLANTA TMA TIP # DK 2 I 00
LENGTH (miles / km)
DESCRPT: FY 2003 DEKALB COUNTY SECTION 5310
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$116,000 $116,000
$29,000
Page 117 0/336
......... _~t4
3
_ _ ...
,
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _._",r
WoI_>t.>_. 9/21/00
""',.,"""" _ _e-e
,"'
"''-,
*'_ _,_ _
DODGE COUNTY
PROJECT: 221960- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 8.4 /13.52
DESCRPT: SR 27 FM CHAUNCEY E CL TO HELENA WEST CUfELFAIR.CO-22196X
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS.: 22196X-
PE: 1993 ROW: 1996 CST: 2001
GA Share:
, UNDERWAY UNDERWAY $14,963,000
$14,963,000
PROJECT: 222410- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 12.6/20.30
DESCRPT: SR 87/US 23 FM CR 332/EASTMAN TO SR 257/FRAZIER (EXCEPTION)
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1996 ROW: 2001 eST:
UNDERWAY $4,084,000 AFTER 2003
PROJECT: 245355-TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) . 0.23/0.37
DESCRPT: SR 87/EASTMAN-RHINE HWY @ SUGAR CREEK 1.8 MI S OF EASTMAN
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,0.00
AFTER 2003
PROJECT: 26206Z- TYPE WORK: WIDENING LENGTH (miles / km)
FUND: STATE 0/0.00
DESCRPT: SR 31/US 441 FM N/CR 132 THRU DODGE TO SR 46/WHEELER-262061
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 262061-
.~.
PE.NONE ROW: NONE eST: NONE
PROJECT: 271306- .TYPE WORK: LANDSCAPING
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: DOWNTOWN EASTMAN LANDSCAPING AND STREETS CAPE
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
$632,000 $506,000
$126,000
~~ .
~~':.;,-_:..'
Page 1/80/336
"_ _'
STATE TRANSPORTATioNiMPROVEMENTPROGRAM
__ 9/21/00
'
"''''-'~'''~_'''''''';O_'_'''~~_~~.
'_~
._,
DOOLY COUNTY
PROJECT: 0001123 TYPE WORK: RR XING LENGTH (miles I km)
DESCRPT: CR 326/COTTON ST IN VIENNA @ CSX # 638341J LUMP SUM PROJECT
FUND: STP 0 10.00
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
_
$100,000 $80,000. $20,000
PROJECT: 31 1665- TYPE WORK: BRIDGE REHAB LENGTH (miles I km)
DESCRPT: 1-75 WIDEN BRIDGE & RAMPS@SR27
FUND: 1M 0.510.81
PE: 1997 ROW: 2001 CST:
UNDERWAY $612,000
AFTER 2003
PROJECT: 333190- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (mileslkm) 0.22/0.35
DESCRPT: SR 27 @ PENNAHATCHEE CREEK WEST OF VIENNA
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page 119 0[336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
DOUGHERTY COUNTY
PROJECT: 0000522 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ALBANY TIP # TSM-8
LENGTH (miles I km) 0.510.81
DESCRPT: SR 133 AT COUNTY LINE ROAD/CR 459 AT WORTH COUNTY LINE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 00005X2
PE: 2001 ROW: CST:
$90,000 AFTER 2003 AFTER 2003
PROJECT: 422550- TYPE WORK: INTERCHANGE
FUND: NHS
ALBANY TIP # NHS-2
LENGTH (miles I km) 0.510.81
DESCRPT: SR 3/LIBERTY EXWY @ SR 91 & N.JEFFERSON INTERCHANGE RAMPS
EXIST. LANES: 01 PROPOSED LANES: 04
PE: 1999 ROW: 2002 CST: 2002 FED Share: GA Share:
UNDERWAY $150,000
$2,178,000 $1,742,400
$435,600
PROJECT: 422560-, TYPE WORK: RAMP
FUND:NHS
ALBANY TIP # NHS-4
; LENGTH (miles I km) . 0.2 10.32
DESCRPT: SR 3/LIBERTY PKWY @ CLARK AVE - RAMPS & TURN LANES/ALBANY
EXIST. LANES; 01 PROPOSED LANES: 04
PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:
UNDERWAY
$234,000 $187,200
$46,800
PROJECT: 422570- TYPE WORK: INTERCHANGE
FUND: NHS
ALBANY TIP # NHS-3
LENGTH (miles I km) 0.5 10.81
DESCRPT: SR 3ILIBERTY EXWY @ NB & SB RAMPS AT SR I33IMOUL TRIE RD
PE: 1999 ROW: 2002 CST: 2002 FED Share: GA Share:
UNDERWAY $150,000 $650,000 $520,000 $130,000
PROJECT: 422670- TYPE WORK: ATMS/ITS
ALBANY TIP # NHS-5
LENGTH (miles I km)
DESCRPT: ATMS/ ALBANY SLO SCAN/CMS/RADAR
FUND: NHS 010.00
PE: NONE ROW: NONE CST: 2003 FED Share: GA Share:
$1,650,0'00 $1,320,000
$330,000
PROJECT: 431740- TYPE WORK: WIDENING
FUND: STP
ALBANY TIP # HlR-99-6
LENGTH (miles I km) 1.3 12.09
DESCRPT: SLAPPEY BL VD/SR 62 & SR 520BU FM COLQUITT AVE N TO TIFT AVE
EXIST. LANES; 04 PROPOSED LANES: 06
PE:2002 ROW: CST:
$168,000 AFTER 2003 AFTER 2003
PROJECT: 432125- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
ALBANY TIP #
LENGTH (mileslkm) 0.23/0.37
DESCRPT: SR 133 SBL @ GA-FLA RAILNET INC ALBANY - SE SECTION
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 450490- TYPE WORK: WIDENING
FUND: STP
ALBANYTIP#HlR-95-6
LENGTH (miles I km) 2.17/3.49
DESCRPT: SR 234/GILLIONVILLE RD FM EIGHT MILE RD TO LOCKETT STATION
EXIST. LANES; 02 PROPOSED LANES: 04
PE: 1997 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$6,653,000 $5,322,400 $1,330,600
Page 120 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
DOUGHERTY COUNTY
PROJECT: 450495- TYPE WORK: WIDENING
FUND: STP
ALBANY TIP # HIR-95-5
LENGTH (miles / km) 1.3 12.09
DESCRPT: SR 234/GILLIONVILLE RD FM LOCKETT STATION RD TO BEATTIE RD
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1996 ROW: LOCL CST: 2001 FED Shure: GA Shure:
UNDERWAY
$2,904,000 $2,323',200
$580,800
PROJECT: 4D4030- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
ALBANY TIP #
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: FACILITY MODIFICATION; TRANSIT COACH; PARATRANSIT VEHICLES;
CST: 2001
FED Shure:
GA Share:
OTH Shure:
PROJECT: 4D4031- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
ALBANY TIP #
LENGTH (miles / km) 0 /0.00
ROW: NONE
DESCRPT: TRANSIT COACH LEASE; PARATRANSIT VEHICLES; BICYCLE RACKS
CST: 2001
FED Share:
GA Shure:
OTH Shure:
PROJECT: 4D4032- TYPE WORK: OPERATING
ALBANY TIP #
LENGTH (miles / km)
DESCRPT: TRANSIT OPERATING ASSISTANCE FOR FY 2001
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
OTH Shure:
PROJECT: 4D4033- TYPE WORK: CAPITAL
ALBANY TIP #
LENGTH (miles / km)
DESCRPT: TRANSIT COACHES
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002
FED Shure:
GA Shure:
OTH Shure:
PROJECT: 4D4034- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
ALBANY TIP #
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: TRANSIT COACH LEASE; PARA TRANSIT VEHICLES; CAPITAL MAINT.
CST: 2002
FED Share:
GA Shure:
OTH Share:
PROJECT: 4D4035- TYPE WORK: OPERATING
ALBANY TIP #
LENGTH (miles / km)
DESCRPT: TRANSIT OPERATING ASSISTANCE FOR FY 2002
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
,.-(;
;;:~~.~:
PROJECT: 4V7015- TYPE WORK: CAPITAL
ALBANY TIP #
LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$3,645,000 $3,240,000
$405,000 $405,000
$442,000 $393,000
$49,000 $49,000
$1,399,000 $363,000
$1,036,000
$495,000 $440,000
$55,000 $55,000
$375,000 $333,000
$42,000 $42,000
$1,399,000 $369,000
$1,030,000
$22,000 $22,000
$5,000
Page 1210[336
__ --_. . _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9121100
._--------_._------~--,-----_.
-
DOUGHERTY COUNTY
PROJECT: 4V7016- TYPE WORK: CAPITAL
ALBANY TIP #
LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$23,000 $23,000
$5,000
PROJECT: TOOOl18 TYPE WORK: . CAPITAL
ALBANY TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 ALBANY SECTION 5307 CAPITAL
PROJECT: TOOOl19 TYPE WORK: CAPITAL
ALBANY TIP #
LENGTH (mile~/km)
DESCRPT: FY 2003 ALBANY SECTION 5309 CAPITAL
PROJECT: TOOOl20 TYPE WORK: CAPITAL
ALBANY TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 ALBANY SECTION 5310 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
)FEDShare:
GA Share:
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
.FED Share:
GA Share:
OTHShare:
FUND: TRANSIT
PE: 1'JONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
. . :...,. ' PROJECT: TOOOl2I TYPE WORK: ,OPERATING
ALBANY TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 ALBANY SECTION 5307 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
OTHShare:
$439,000 $390,000 $49,000 $49,000
$743,000 $660,000
$83,000. $83,000
$24,000 $24,000
$6,000
$1,399,000 $363,000
$1,036,000
~. . ,
~~.~~:
Page J 22 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
-
_ .., , _,_9o/2._1../..0..0.
_
DOUGLAS COUNTY
PROJECT: 0000245 TYPE WORK: BRIDGE REHAB
FUND: DEMO
ATLANTA TMA TIP # DO 0 I 7C I
LENGTH (miles I km) 0.65 11.05
DESCRPT: SR 61 CONN/LIBERTY ROAD FM 120 TO PUNKINTOWN RD REALIGNMENT
ASSOCIATED PROJECTS: 00Y0245
PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$500,000 $400,000 $100,000
PROJECT: 0000333 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # DO 281
LENGTH (mileslkm) 0.5/0.81
DESCRPT: SR 92/DALLAS HIGHWAY AT THOMPSON STREETICR 519
PE:LOCL ROW: LOCL CST: 2003 FED Share:
PROJECT: 0000424 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
.ATLANTA TMA TIP # AR 157
LENGTH (miles I km) 0.2 10.32
DESCRPT: SR 5/BANKHEAD HWYIBILL ARP RD AT ROSE AVENUE/CS 573
LUMP SUM PROJECT
OTH Share:
PE: 2000 ROW: LOCL CST: 2001 FED Share: GA Share:
$95,000 $76,000
$19,000
UNDERWAY
$1,088,000 $979,200 $108,800
PROJECT: 0000632 TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: LOCL.
ATLANTA TMA TIP # DO AR BPO17
LENGTH (miles I km) 0 10.00
ROW: LOCL
DESCRPT: FAIRBURN RD SIDEWALKS FM BANKHEAD HWY TO HOSPITAL DR
CST: 2003
FED Share:
OTH Share:
PROJECT: 0000633 TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # DO AR BP053
LENGTH (miles I km)
DESCRPT: MALONE ST SIDEWALKS FM E. STRICKLAND TO BROWN
FUND: CMAQ 0.5/0.81
PE: LOCL ROW: LOCL CST: 2003 FED Share:
OTH Share:
PROJECT: 0000634 TYPE WORK: SIDEWALKS
FUND: CMAQ
PE:LOCL
ATLANTA TMA TIP # DO AR BP054
LENGTH (miles I km) 0.5 10.81
ROW: LOCL
DESCRPT: ROSE AVE SIDEWALKS FM SALMEN DR TO CONCOURSE PKWY
CST: 2003
FED Share:
OTH Share:
PROJECT: 0000635 TYPE WORK: SIDEWALKS
FUND: CMAQ
ATLANTA TMA TIP # DO AR BP061
LENGTH (miles I km) 0.9 I 1.45
DESCRPT: DOUGLAS BL VD SIDEWALKS W. FM BILL ARP/SR 5 TO BRIGHT STAR RD
PE: LOCL ROW: LOCL CST: 2003 FED Share:
OTH Share:
f -".~
li?
PROJECT: 0000636 TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP# DOARBP062
LENGTH (mileslkm) 0.37/0.60
ROW: LOCL
DESCRPT: CHAPEL HILL RD SIDEWALKS FM 120 TO RESERVOIR DR
CST: 2003
FED Share:
OTHShare:
$79,000 $63,000 $16,000
$63,000 $50,000 $13,000
$197,000 $158,000 $39,000
$98,000 $78,000 $20,000
$37,000 $30,000
$7,000
Page 123 of336
STATE TRANSPORTATIONIMPROVEMENTPROGRAM
_,_. 9121100 ---~--_.....
_._._._-----"'''_......-_'"'''''''''''''.,.'''-~~--,---- " ' - - - " ,...
DOUGLAS COUNTY
PROJECT: 00Y0245 TYPE WORK: WIDENING
FUND: STP
PE: 1995
UNDERWAY
~
ATLANTA TMA TIP # DO 017C2
. LENGTH (miles / km) 0.65/1.05
ROW: LOCL
DESCRPT: SR 61 CONN FM 120 TO PUNKINTOWN RD - FOR Q24 $; SEE 0000245
CST: 2001
$2,778,000
FED Share:
$2,222,400
ASSOCIATED PROJECTS: 0000245
GA Share:
$555,600
PROJECT: 713490- TYPE WORK: NEW CONSTRUCTION
FUND: STP
ATLANTA TMA TIP # DO 017 A
LENGTH (miles / km) 0.08 /0.13
DESCRPT: 1-20 @SR 61 CONN/LIBERTY ROAD INTERCHANGE RECONSTRUCTION
PE: 1~95 ROW: LOCL CST: 2003 FED Share: GA Share:
PROJECT: 721590- TYPE WORK: WIDENING
FUND: STP
ATLANTA TMA TIP # DO 029A
LENGTH (miles /Rm) 5.88/9.47
DESCRPT: SR 5&8/US 78/BANKHEAD FM SR 92 E TO CR IS/SWEETWATER RD
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 72Y590-
PE: 1992 ROW: 2003 CST:
UNDERWAY
$3,800,000 $3,040,000
$760,000
, UNDERWAY
$8,000,000 AFTER 2003
PROJECT: 721770- TYPE WORK: WIDENING
FUND: STP
ATLANTATMATIP#DOOI9
LENGTH (miJes/km) 2.91/4.69
DESCRPT: SR 166 FM OLD LOWER RIVER RD/DOUGLAS TO SR 70IFULTON CO
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 72 I77X-
PE: 1992 ROW: 2003 CST:
UNDERWAY $4,100,000 AFTER 2003
PROJECT: 72Y590- TYPE WORK: WIDENING
FUND: STP
ATLANTA TMA TIP.# DO 029B
LENGTH (miles / km) 5.88/9.47
DESCRPT: SR 5&8/US 78/BANKHEAD HW FM SR 92 TO CR 15/SWEETWATERIADD RW
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 721590-
PE:NONE ROW: 2003 CST: NONE.
$11,637,000
PROJECT: 731800- TYPE WORK: SIGNALS
ATLANTA TMA TIP # DO 257
LENGTH (miles / km)
DESCRPT: BILL ARP RD/SR 5 AT WESLEY POND RD
FUND: STP 0.2 /0.32
PE:LOCL ROW: LOCL CS,T: 2001 FED Share:
PROJECT: 731810- TYPE WORK: SIGNALS .
ATLANTA TMA TIP # DO 264
LENGTH (miles / km)
DESCRPT: DALLAS HWY/SR 92 AT UPSHAW MILL RD
FUND:STP 0.2/0.32
OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
(.
l
ti~~~~:
PROJECT: 731825- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # DO 265
LENGTH (miles / km) 0.42 /0.68
DESCRPT: SR 5 AT SR 92 REALIGN AND IMPROVE SIGNALIZATION
OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
OTHShare:
$142,000 $114,000
$28,000
$60,000 $48,000 $12,000 UNDERWAY $225,000 $180,000 $45,000
Page 124 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
----_ - 9/21/00
....... . ,. .._-----~---_ _-~---
DOUGLAS COUNTY
:
PROJECT: 753090- TYPE WORK: SIGNALS
FUND: STP
PE:LOCL
ATLANTA TMA TIP # DO 267
LENGTH (miles / km) 0.42 /0.68
ROW: LOCL
DESCRPT: DOUGLAS BOULEYARD AT STEW ART PARK WAY--SIGNALS
CST: 2001
$60,000
FED Share:
$48,000
PROJECT: 753095- TYPE WORK: TURN LANES
FUND: STP
ATLANT A TMA TIP # DO 258
LENGTH (miles I km) 0.2 10.32
DESCRPT: LEE RD/CR 817 AT EAST COUNTY UNE RD & SIDEWALKS
OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
$12,000 UNDERWAY
$90,000 $72,000
PROJECT: 753100- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # DO 262
LENGTH (miles / km) 0.2 10.32
DESCRPT: CENTRAL CHURCH RD/CR 173 AT KINGS HIGHWAY/CR 810
OTH Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
$18,000 UNDERWAY
$100,000 $80,000
PROJECT: 753105- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # DO 268
LENGTH (miles I km) 0.2 /0.32
DESCRPT: CENTRAL CHURCH RD AT YANCEY RD/COURSEY LAKE RDIREALIGN
OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
$20,000 UNDERWAY
$90,000 $72,000
PROJECT: 753110- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # DO 266
LENGTH (miles / km) 0.2/0.32
DESCRPT: CHAPEL HILL RD/CR 812 AT WEST CHAPEL HILL RD/CR 145
OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
$18,000 UNDERWAY
$90,000 $72,000
PROJECT: 753295- .TYPE WORK: REPLACE BRIDGE
FUND: STP
ATLANTA TMA TIP # DO 275
LENGTH (miles / km) 0.42/0.68
DESCRPT: ANNEEWAKEE RD/CR 815 BRIDGE @ ANNEEW AKEE CREEK
OTHShare:
PE:LOCL ROW: 2001 CST: 2001 FED Share:
$18,000
$20,000 $1,000,000
$800,000
PROJECT: 762385- TYPE WORK: WIDENING
FUND: STP
ATLANTA TMA TIP # DO 0 17B1
LENGTH (miles / km) 0.65 11.05
DESCRPT: SR 61 CONN/UBERTY ROAD FM 1-20 TO PUNKINTOWN ROAD
EXIST. LANES: 02 PROPOSED LANES: 04
OTH Share:
PE: 1995 ROW: LOCL CST: 2003 FED Share: GA Share:
$200,000
UNDERWAY
$6,400,000 $5,120,000 $1,280,000
PROJECT: 762510- TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: 1995
ATLANTA TMA TIP # DO AR BP048A
LENGTH (mileslkm) 010.00
ROW: LOCL
DESCRPT: SIDEWALKS: EAST COUNTY LINE RD FM MACK RD 1'0 LEE ROAD
CST: 2001
FED Share:
OTH Share:
UNDERWAY
$163,000 $130,000
$33,000
Page 125 0/336
STATE
TRANSPORTATI.ON
IMPROVEMENT .
PRO.GRAM
..-_-----,..._--------
9/21/00
DOUGLAS COUNTY
PROJECT: 770163- TYPE WORK: REPLACE BRIDGE
ATLANTA TMA TIP #. DO 274
LENGTH (miles / km)
DESCRPT: POST RO/CR 808 BRIDGE @ DOG RIVER
FUND: STP 0.2 /0.32
PE:LOCL ROW: 2001 . CST: 2002 FED Share:
OTH Share:
PROJECT: 771124- TYPE WORK: SIDEWALKS
ATLANTA TMA TIP #. DO AR 1770
LENGTH (miles / km)
DESCRPT: SIDEWALKS IN OOUGLASVILLE-PRESTLEY MILL ROAD
FUND: CMAQ
PE:LOCL
0.28 /0.45
ROW: LOCL
CST: 2001
FED Share:
OTH Share:
PROJECT: 707552- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
ATLANT A TMA TIP #. DO 211C
LENGTH (miles / km} 0 /0.00
ROW: NONE
DESCRPT: TRANSIT CAPITAL (SECTION 5307) ASSISTANCE FOR.FY 2001
CST: 2001
FED Share:
GA Share:
OTHShare:
PROJECT: 707554- TYPE WORK: CAPITAL
ATLANTA TMA TIP #. DO 211C
LENGTH (miles / km)
DESCRPT: TRANSIT CAPITAL ITEMS
FUND: TRANSll
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTHShare:
PR. OJECT:. 7V7044- TYPE WORK: CAPIT.AL
ATLANTA TMA TIP #. DO 2130
. LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$20,000 $1,000,000
$800,000 $200,000
$84,000 $67,000 $17,000
$1,404,000 $1,248,000
$46,000 $156,000
$445,000 $395,000 $50,000 $50,000
$12,000 $12,000
$3,000
PROJECT: TOOOOl4 TYPE WORK:CAPJ:rAL
ATLANTA TMA TIP #. DO 2130
LENGTH (miles / km)
DESCRPT:FY 2002 DOUGLAS COUNTY SECTION 5310
,,
PROJECT: T000024 TYPE WORK: CAPITAL
ATLANTA TMA TIP #. DO 2130
LENGTH (miles / km)
DESCRPT: FY 2003 DOUGLAS COUNTY SECTION 5310
FUND: TRANSIT
PE."NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 200~
FED Share:
GA Share:
$12,000 $12,000 $3,000
$13,000 $13,000
$3,000
. PROJECT: T000040 TYPE WORK: CAPITAL
ATLANTA TMA TIP #. DO 211C
LENGTH (miles / km)
DESCRPT: FY 2003 DOUGLAS COUNTY CAPITAL SECTION 5307
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
"
$394,000
$350,000
"
$44,000
$44,000
Page 126 of336
_ _ _,_.
STATE TRANSPORTATION IMPROVEMENTPROGRAM
"""""'"
.I,
9/21/00
~_."'-~----------_._-_ ....._ - _...~ _ _ y
EARLY COUNTY
PROJECT: 0000352 TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 1.3 /2.09
DESCRPT: SR 38/US 84 FROM ALABAMA LINE TO SR 370 INCLUDING RIVER BR
EXIST. LANES: 02 PROPOSED LANES: 04
PE:2001 ROW: CST:
$500,000 AFTER 2003 AFTER 2003
PROJECT: 0000353 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.26/0.42
DESCRPT: SR 38/US 84 @ CHAITAHOOCHEE RIVER OIF @ MP .30 WEST OF JAKIN
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2001 ROW: NONE CST:
$230,000 AFTER 2003
PROJECT: 0000354 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.25 /0.40
DESCRPT: SR 38/US 84 @ CHAITAHOOCHEE RIVER AT MP 1.00 WEST OF JAKIN
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2001 ROW: NONE CST:
$180,000 AFTER 2003
PROJECT: 422215- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 7.3/11.75
DESCRPT: SR IIUS 27 FM CR 279/DAMASCUS-HILTON RD TO BLAKELY BYPASS
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 431320- 42Y215-
PE: 1996 ROW: 2002 CST:
UNDERWAY $3,885,000 AFTER 2003
PROJECT: 422220- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 7.15/11.51
DESCRPT: SR IIUS 27 FR BLAKELY BYPASS TO CLAY COUNTY LINE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 42Y220-
PE: 1993 ROW: 2001 CST:
UNDERWAY $1,275,000 AFTER 2003
PROJECT: 431320- TYPE WORK: REPLACE BRIDGE LENGTH (miles-s' km)
DESCRPT: SR lOVER BLUE CREEK TRIB
ASSOCIATED PROJECTS: 422215-
FUND: BRIDGE
PE: 1994
0.75/ 1.21
ROW: NONE
CST: 2003
FEDShare:
GA Share:
UNDERWAY
$369,000 $295,200
$73,800
~
l:~
Page J27 of336
STATE TRA, N_. SPORTATI- ON IMPRO. VEMENT PROGRAM
9/21/00
ECHOLS COUNTY
PROJECT: 42Y 420- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km)
0/0.00
DESCRPT: SR 89IUS 441 FROM FLA TO CR 8 IN CLINCH - FOR FED PE; 422420
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIA TED PROJECTS: 422420-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 442985- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 135 @ LITTLE RIVER APP 5 MI S OF JCT SR 376
FUND: BRIDGE 0.26 /0.42
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 442986- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 94 @ TOMS CREEK APP 10.3 MI E OF JCT SR I I
FUND: BRIDGE 0.23 /0.37
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PE: 2001 ROW: LOCL CST: 2003 . FED Share: GA Share:
$33,000
$325,000 $260,000
$65,000
.;. ~:;_.>~.,;
Page 128 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_- - - - - - - - - - ' - , - - - - - - - -9/-21/0-0 _...~ .. ~--_.-,_.......
EFFINGHAM COUNTY
PROJECT: 0000073 TYPE WORK: BICYCLE/PED, FACILITY LENGTH (miles / km)
DESCRPT: EBENEZER BIKEIPED. TRAIL
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000269 TYPE WORK: PRELIMINARY ENGINEERING
FUND: STP
LENGTH (miles / km) 0.25 /0.40
DESCRPT: SR 119 STUDY ROADWAY LOWERING AT RR CROSSING IN SPRINGFIELD
OTH Share:
PE: 2001 ROW: NONE CST: NONE
$500,000 $400,000
$100,000 $100,000
PROJECT: 222270- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles/ km) 10.2/16.39
DESCRPT: SR 21 FM N OF CR 39 TO CR 255 IN SCREVEN COUNTY & 22R270
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 22227X- 22R270-
PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $3,145,000
$14,570,000 $11,656,000
$2,914,000
PROJECT: 22R270- TYPE WORK: WIDENING
FUND: HPP
LENGTH (miles / km) 10.2 / 16.39
DESCRPT: SR 21 FM N OF CR 39 TO CR 255/SCREVEN - FOR HPP $1 222270
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 222270-
PE: 1993 . ROW: NONE CST: 2003 FED Share: GA Share:
UNDERWAY
$3,230,000 $2,584,000
$646,000
PROJECT: 521702- TYPE WORK: BARRIERS
FUND: STATE
LENGTH (miles / km) 0/0.00
DESCRPT: SR 2'I-CONSTRUCTION OF A NOISE WALL FOR SPRINGFIELD BYPASS
PE: 1993 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 522170- .TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 2.6/4.19
DESCRPT: SR 17&261US 80 fM SR 17 TO CHERRY ST IN BLOOMINGDALE/CHATHAM
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 52217X-
PE: 1993 ROW: 1998 CST: 2002 FED Share: GA Share:
UNDERWAY UNDERWAY $4,156,000 $3,324,800
$831,200
PROJECT: 571408- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: MULTI-USE TRAIL IN SPRINGFIELD
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
..
t
~t~;'
OTH Share:
PROJECT: 571450- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
.
LENGTH (miles / km) 0.23/0.37
ROW: LOCL
DESCRPT: CR 183/LOG LANDING ROAD @ EBENEZER CREEK 4 MI "N OF RINCON
CST: 2002
FED Share:
GA Share:
$802,000 $642,000
$160,000
UNDERWAY
$584,000 $467,200 $116,800
Page 119 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
.....- - - - - ~ - - - - - - - - ~ - -
9/il/OO
_.o_.
._
EFFINGHAM COUNTY
PROJECT: M000343 TYPE WORK: SHOULDER WORK LENGTH (miles / km)
DESCRPT: SR 17 FM SR 30/US 17 TO N OF SR 119 LUMP SUM PROJECT
FUND: STP 10.1 /16.21
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$782,000 $625,600 $156,400
Page 130 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
- _.. __-,--_._----_., .. _----------~--_.....
9/21/00
--"_._~._._-----_.
ELBERT COUNTY
PROJECT: 0000680 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.21 10.34
DESCRPT: CR 37/ELIAM ROAD@WAHACHEECREEK5 MI S OF MIDDLETON
PE:2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 0000681 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.21 10.34
DESCRPT: CR 84/ED WEBB ROAD @ DOVE CREEK 6.5 MI W OF ELBERTON
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 0000682 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (mileslkm) 0.21/0.34
DESCRPT: CR I95/PEACHTREE ROAD@LITTLE COLDWATER CREEK N OF ELBERTON
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 12Y840- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles I km) 010.00
DESCRPT: SR 17 FROM NORTH OF CR 50 TO SO OF CR 367-FOR FED PEIJ22840
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 122840-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 132410- TYPE WORK: INTERCHANGE LENGTH (miles I km)
DESCRPT: SR 72/SR 17 INTERCHANGE JUST WEST OF ELBERTON EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STATE 0.58/0.93
PE: 1993 ROW: 1999 CST: 2001
GA Share:
UNDERWAY UNDERWAY
$7,468,000
$7,468,000
PROJECT: 132990- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.23/0.37
DESCRPT: SR 77@FALLING CREEK 6.1 MI S OF ELBERTON
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 142020- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles I km) 0.23/0.37
ROW: LOCL
. DESCRPT: CR 242/BREWERS BRIDGE RD @ BEAVERDAM CK 2.5 MI N OF ELBERTON
CST: 2001
FED Share:
GA Share:
UNDERWAY
$571,000 $456,800 $114,200
r
l~)
Page 131 of336
, ,
STATE
TRANSPORTATIO.N
IM. PROVEMENT
PROGRAM
-'--.-_ _-.~--:---~
_ _. 9/21/00
~-""'""""J=------.----------
_
EMANUEL COUNTY
PROJECT: 221900- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 2.2 13.54
DESCRPT: SR 4/US I FM SOUTH TO NORTH CTY LMTS IN OAK PARKINEW LOC
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 22Y900-
PE: 1993 ROW: 2001 CST:
UNDERWAY $1,109,000 AFTER 2003
PROJECT: 221910- TYPE WORK: WlpENING LENGTH (miles 1 km)
DESCRPT: SR 4/US I FROM NCL OAK PARK TO 1-16 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 22Y910-
FUND: STATE 2.3/3.70
PE: 1993 ROW: 2001 CST:
UNDERWAY $160,000
AFTER 2003
PROJECT: 222490- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 9.8/15.78
DESCRPT: SR 4/US I FM N. OF 1-16 NORTH TO SR 297@SWAINSBOROBYPASS
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 22Y490-
\
PROJECT: 222630- . TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles 1 km) 2.5 14.03
DESCRPT: SR 4/US I FM PROPOSED BYPASS N TO INJUNCTION RD IN SWAINSBOR
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 2001 CST:
PE:2001 ROW: CST:
UNDERWAY $2,593,000 AFTER 2003
$110,000 AFTER 2003 AFTER 2003
PROJECT: 231960- TYPE WORK: REPLACE BRIDGE
FUND: BRlDGE
LENGTH (miles 1 km) 0.74/1.19
DESCRPT: SR 56 (3) BRIDGES OVER OGEECHEE RVR & OVFL NE OF SUMMERTOWN .
PE: 1997 ROW: 2002 CST:
UNDERWAY $2,000
AFTER 2003
PROJECT: 231970- ToYPE WORK: BRIDGE REHAB
FUND: BRIDGE
LENGTH (miles r km) 0.23/0.37
DESCRPT: SR 57 OVER SARDIS CREEK 9.7 MILES NW OF SWAINSBORO
PE:1997 ROW: 2001 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 232010- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (mileslkm) 3.71/5.97
DESCRPT: SR 26- 2 LOC BETWEEN SWAINSBORO & TWIN CITY AND TURN LANE
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 2003 ROW: CST:
$170,000 AFTER 2003 AFTER 2003
PROJECT: 232325- TYPE WORK: REPLAc:E BRIDGE
FUND: BRIDGE
LENGTH (miles 1 km) 0.21 /0.34
DESCRPT: SR 26IUS 80 @ E FORK YAM GRANDY CK 2.2 MI SW OF SWAINSBORO
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
Page 132 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
__ ------ ------------_._--_._._-,--.
...... 9/21/00
._-_._._._~_._
EMANUEL COUNTY
PROJECT: 262390- TYPE WORK: NEW CONSTRUCTION
FUND: STATE
LENGTH (miles / km) 5.5/8.86
DESCRPT: N SWAINSBORO BYP FM SR 26/US 80 NW TO SR 4/US I NEAR CR 98
EXIST. LANES: 00 PROPOSED LANES: 02
ASSOCIATED PROJECTS: 262395-
PE: 1993 ROW: 1998 CST: 2001
GA Share:
UNDERWAY UNDERWAY $11,967,000
$11,967,000
PROJECT: 262395- TYPE WORK: NEW CONSTRUCTION LENGTH (miles / km)
DESCRPT: SR 4/SWAINSBORO S BYP FM S OF SR 297 NW TO US 80 EXIST. LANES: 00 PROPOSED LANES: 02 ASSOCIATED PROJECTS: 262390-
FUND: STATE 5/8.05
PE: 1993 ROW: 1998 CST: 2001
GA Share:'
UNDERWAY UNDERWAY $15,246,000
$15,246,000
PROJECT: 52213X- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 0/0.00
DESCRPT: SR 4/US I FM LYONS CLITOOMBS TO SOUTH CLiOAK PARK-SEE TOOMBS
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 522130-
PE:NONE ROW: NONE CST: NONE
~.\
L;~:'
Page J33 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
EVANS COUNTY
PROJECT: 0000074 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: CLAXTON PLANNING FOR MULTI-USE FACILITY AND LANDSCAPING
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$S4,000 $67,000
OTH Share:
PROJECT: 522105- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 1.54/ 2AS
DESCRPT: SR 30/CLAXTON FM WEST CTY LMTS TO EAST CTY LMTS
EXIST. LANES: 02 PRQPOSED LANES: 05
PE: 2000 ROW: 2002 CST:
$17,000
"-UNDERWAY $2,436,000 AFTER 2003
Page 134 of336
-,--- ,---------------'--,,.---------------------STATE TRANSPORTATION IMPROVEMENT PROGRAM
...-~
9/21/00
1I'_ _ 1.._ .......-_... _ . _ ....._ .. .
.._ . .
li _ _,
_
FANNIN COUNTY
PROJECT: 62214Z- TYPE WORK: TURN LANES
FUND:NHS
LENGTH (mileslkm) 16,9/27.27
DESCRPT: SR515 FM 1-575 THRU GILMER TO TOTEHEROW RD/FANNINISEE PICKEN
ASSOCIATED PROJECTS: 622140-
PE:NONE ROW: NONE CST: NONE
PROJECT: 630870- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 60 FM CR 63 TO MINERAL BLUFF CL & MP 24.3-25.3 EXIST. LANES: 02 PROPOSED LANES: 03
FUND:STP 1.15/1.85
PE: 1999 ROW: 2002 CST:
UNDERWAY $18,000
AFTER 2003
PROJECT: 630872- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles 1 km) 9.4 /15.13
DESCRPT: SR 60/SR 60SP FM SR 2 TO NORTH CAROLINA/INC MINERAL BLUFF BP
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2002 ROW: CST:
$1,200,000 AFTER 2003 AFTER 2003
PROJECT: 642160- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles 1 km) 0.15/0.24
DESCRPT: SR 60 BRIDGE REPLACEMENT OVER COOPER'S CREEK
ASSOCIATED PROJECTS: 642165-
PE: 1995 ' ROW: 2001 CST:
UNDERWAY $7,000
AFTER 2003
PROJECT: 642165- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.15 /0.24
DESCRPT: SR 60 OVER SKEENAH CREEK & CHAPEL BRANCH {PIPE ONLY}
ASSOCIATED PROJECTS: 642160-
PE: 1995 ROW: 2001 CST:
UNDERWAY $7,000
AFTER 2003
PROJECT: 642280- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles / km) 0.22/0.35
ROW: LOCL
DESCRPT: CR 220/LOVING RD @ HEMPTOWN CREEK 1.5 MI NE OF MORGANTON
CST: 2001
FED Share:
GA Share:
UNDERWAY
$670,000 $536,000 $134,000
.'
~~;. ..
l:>
Page 135 0/336
... r--------------------~~.~'-.~.- -~~-----------~~~
STATE TRANSPORTATION IMPROVEMENT PROGRAM
.... 9/21/00
------------~------....;...---------_~----,-----
FAYETTE COUNTY
PROJECT: 0000093 TYPE WORK: SIDEWALKS
FUND: STP
ATLANT A TMA TIP # FA AR BP029
LENGTH (miles / km) 0/0.00
DESCRPT: PEACHTREE CITY HWY 54 EAST LANDSCAPE ENHANCEMENTS PHASE 3
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$83,000 $66,000
PROJECT: 0000094 TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # FA AR BP030
LENGTH (miles / km)
DESCRPT: TYRONE ARROWOOD SIDEWALK PROJECT
FUND: STP 0/0.00
OTH Share: .
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$17,000
$89,000 $71,000
PROJECT: 0000095 TYPE WORK: SIDEWALKS
FUND: STP
ATLANTA TMA TIP # FA AR BP031
LENGTH (miles / km) 0/0.00
DESCRPT: FAYETTEVILLE CHURCH STREET PROJECT & LANDSCAPING
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$18,000
$239,000 $191,000
PROJECT: 0000096 TYPE WORK:BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FA AR BP032
LENGTH (miles / km)
DESCRPT: PEACHTREE CITY FLAT CREEK MULTI-USE BRIDGE
FUND:STP 0/0.00
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$48,000
$72,000 $58,000
OTH Share:
PROJECT: 322065- TYPE WORK: REPLACE BRIDGE
ATLANTA TMA TIP # FA 012
LENGTH (miles / km)
DESCRPT: SR 54 @ SCL RR
EXIST. LANES: 02 PROPOSED LANES: .04
ASSOCIA TED PROJECTS: 322060-
FUND: BRIDGE
PE: 1992
0.0 I /0.02
ROW: NONE
CST: 2003
FED Share:
GA Share:
$14,000
UNDERWAY
$871,000 $696,800 $174,200
PROJECT: 32206X- TYPE WORK: WIDENING
ATLANT A TMA TIP # CW 003
LENGTH (miles / km)
DESCRPT: SR 34/54 FM FISCHER CROSS RDS TO SR 74 1322060
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIA TED PROJECTS: 322060-
FUND:STP 0/0.00
PE:NONE ROW: NONE CST: NONE
PROJECT: 32206Z- TYPE WORK: BRIDGE REHAB
ATLANT A TMA TIP # CW 008
LENGTH (miles / km)
DESCRPT: SR 54@LINECREEK/SEECOWETACO-322063
ASSOCIATED PROJECTS: 322063-
FUND: BRIDGE 0/0.00
PE:NONE ROW: NONE CST: NONE
PROJECT: 332370- TYPE WORK: TURN LANES
FUND: STP
ATLANTA TMA TIP# FA 101
LENGTH (miles/km) 0.42/0.68
DESCRPT: SR 92 @ RIVERS ROAD AND WES~ BRIDGE ROAD - TURN LANES
f.
~::::;..;-~.
PE: 1996 ROW: 19LU CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$130,000 $117,000 $13,000
Page 136 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FAYETTE COUNTY
PROJECT: 332940- TYPE WORK: TURN LANES
ATLANTA TMA TIP # FA 107
LENGTH (miles I km)
DESCRPT: SR 54 AT JEFF DAVISIADD SIGNALS AND TURN LANES
FUND: STP 0.2 10.32
PE: LOCL ROW: 2001 CST: 2001 FED Share:
PROJECT: 332985- TYPE WORK: SIGNALS ATLANTA TMA TIP # FA 231 DESCRPT: SR 74 AT DOGWOOD TRAIL
LENGTH (miles I km)
FUND: STP 0.2 10.32
OTHShare:
PE:LOCL ROW: 2001 CST: 2001 FED Share:
PROJECT: 332990- TYPE WORK: SIGNALS ATLANTA TMA TIP # FA 227 DESCRPT: HOOD AVE @ SR 85/ SR 92
LENGTH (miles I km)
FUND: STP 0.2/0.32
OTHShare:
PE:LOCL ROW: 2001 CST: 2001 FED Share:
PROJECT: 333000- TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FA 110 .
LENGTH (mileslkm)
DESCRPT: SR 54 AT SANDY CREEK RD/CR 365
FUND: STP 0.2/0.32
OTH Share:
PE: 1999 ROW: 2001 CST: 2001 FED Share:
OTH Share:
PROJECT: 333172- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 010.00
DESCRPT: SR 74 @ LINE CREEK COWETAFAYETTE CO L1NEISEE COWETA 333177
PE:NONE ROW: NONE CST: NONE
ASSOCIATED PROJECTS: 333177-
$100,000 $175,000 $140,000
$35,000
$30,000 $100,000
$80,000
$20,000
$10,000 $70,000 $56,000
$14,000
UNDERWAY $50,000
$100,000 $80,000
$20,000
PROJECT: 371446- TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FA AR 177A
LENGTH (miles I km)
DESCRPT: REDWINE MULIT-USE TRAIL PHASE I
PROJECT: 371447- TYPE WORK: BICYCLE/PED:FACILITY
ATLANTA TMA TIP # FA AR 177B
LENGTH (miles I km)
DESCRPT: REDWINE MULIT-USE TRAIL - PHASE 3 & 4
PROJECT: 3V7039- TYPE WORK: CAPITAL
ATLANTA TMA TIP # FA 100D
LENGTH (miles I km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: CMAQ
PE: LOCL
010.00
ROW: LOCL
CST: 2001
FED Share:
OTH Share:
FUND: CMAQ
PE: LOCL
0/0.00
ROW: LOCL
CST:200J
FED Share:
OTHShare:
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$300,000 $240,000
$60,000
$210,000 $168,000
$42,000
$12,000 $12,000
$3,000
Page 137 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
r,
_ _ _ _ _ _ ...""... ..,. _ _. ~_..._"V'_""'
,~:
9/21/00
~
.......
~.....
" " = __ _" ....._~
FAYETTE COUNTY
PROJECT: 74287X TYPE WORK: WIDENING
FUND: STP
ATLANT A TMA TIP # CL 10 I
, LENGTf!(miles / km) , 0 /0,00
DESCRPT: SR 920 FROM SR 54 TO SR 3/US 19 {REL SR 81l SEE CLAYTON
EXIST, LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 742870-
PE:NONE 'ROW:NONE
CST: NONE
PROJECT: TOOOOl5 TYPE WORK: CAPITAL
ATLANTA TMA TIP # FA 1000
LENGTH (miles / km)
DESCRPT: FY 2002 FAYETTE COUNTY SECTION 5310
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
PROJECT: T000025 TYPE WORK: CAPITAL
ATLANTA TMA TIP # FA 1000
LENGTH (miles / km)
DESCRPT: FY 2003 FAYETTE COUNTY SECTION 5310
FUND: TRANSIT ~ PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$12,000 $12,000 $3,000
$13,000 $13,000 $3,000
..
i.
1
l;:S
,,
\
Page J38 of336
- - - - - - - - - - - _...-
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FLOYD COUNTY
PROJECT: 0000113 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ROME TIP #
LENGTH (miles / km) 0 /0.00
DESCRPT: OOSTANAULA RIVER BRiPED MALL NEAR CO OFC'SILANDSCAPING
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 620590- TYPE WORK: WIDENING
FUND: STP
ROME TIP # L-85-11
LENGTH (miles / km) 0.2 /0.32 .
DESCRPT: SR IIUS 27 IN ROME FM 5TH AVE TO JOHN DAVENPORT DR
EXIST. LANES: 04 PROPOSED LANES: 05
OTHShare:
PE: 1993 ROW: 1997 CST: 2001 FED Share: GA Share:
$1,250,000 $1,000,000
$250,000
UNDERWAY UNDERWAY $3,702,000
$2,961,600 $740,400
PROJECT: 621550- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles/ km) 2.95/4.75
DESCRPT: SR 20/100 FM SR 100 NORTH TO SR 100 SOUTH @ COOSAIINCL CLVT
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$7,680,000 $6,144,000 $1,536,000
PROJECT: 621600- TYPE WORK: NEW CONSTRUCTION
FUND: STATE
PE: 1992
UNDERWAY
ROME TIP # S-89-21
LENGTH (miles / km) 3.9/6.28
ROW: 2002
$11,250,000
DESCRPT: S ROME BYP FM SR I ALONG BOOZE MTN RD TO SR 101 @ CR 96
CST:
AFTER 2003
..
EXIST. LANES: 00 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 62Y600-
PROJECT: 621660- TYPE WORK: NEW CONSTRUCTION
FUND:NHS
ROME TIP # S-92-24
LENGTH (miles / km) 5.4/8.69
DESCRPT: WEST ROME BYP FM HORSELEG CRK RD TO SR 20 @ CR 262; RW=HPP
EXIST. LANES: 00 PROPOSED LANES: 04
PE:NONE ROW: 2001 CST:,.
$8,250,000 AFTER 2003
PROJECT: 621670- TYPE WORK: NEW CONSTRUCTION
FUND:NHS
ROME TIP # S-92-23
LENGTH (miles / km} 5.8/9.34
DESCRPT: SW ROME BYP FM PROP W ROME BYP @ CR 268 TO SR I @ CR 633&BRD
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 2002 CST:
UNDERWAY $8,250,000 AFTER2003
PROJECT: 621690- TYPE WORK: WIDENING
FUND: STP
ROME TIP # S-92-25
LENGTH (miles / km) 0.87/1.40
DESCRPT: SR 101 FM CR 740/SADDLE TR TO CR 335/LOMBARDY WAY IN ROME
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIA TED PROJECTS: 620900-
PE: 1993 ROW: 2003 CST:
UNDERWAY $730,000
AFTER 2003
PROJECT: 622135- TYPE WORK: TURN LANES
FUND:NHS
ROME TIP # N-00-4
LENGTH (miles / km) 2.1 /3.38
DESCRPT: SR 20 TURN LANES FM SR 1 IN ROME TO SR 3 IN BARTOW CO/62Y 135
ASSOCIATED PROJECTS: 62Y I35-
PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$3,297,000 $2,637,600
$659,400
Page 139 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FLOYD .COUNTY
PROJECT: 631480- TYPE WORK: WIDENING
FUND: STP
ROME TIP # L-88
LENGTH (miles 1 km) 1.812.90
DESCRPT: SR IIUS 27 FROM VETERANS HIGHWAY TO OLD DALTON ROAD
EXIST. LANES: 04 PROPOSED LANES: 06
PE: 2001 ROW: CST: .
$352,000 AFTER 2003 AFTER 2003
PROJECT: 642395- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles 1 km) 0.23/0.37
DESCRPT: SR 156 @ JOHNS CREEK ON FLOYD-GORDON CO LINE
ASSOCIATED PROJECTS: 64239X-
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 642405- TYPE WORK: REPLACE BRIDGE LENGTH (mileslkm)
DESCRPT: SR 100 @COOSA RIVER.3 MI SOUTH OF JCT WITH SR 20
FUND: BRIDGE 0.3 10.48
PE:2001 ROW: CST:
$49,000 AFTER 2003 AFTER 2003
PROJECT: 642450- TYPE WORK: NEW CONSTRUCTION
FUND: STP
ROME TIP #
LENGTH (miles 1km) 4 16.44
DESCRPT: NORTH ROME BYPASS FM SR 20 @ CR 756 TO TECHNOLOGY PAR.K\yAY
EXIST. LANES: 00 PROPOSED LANES: 04
PE: 2001 ROW: LOCL CST:
$1,800,000 AFTER 2003
PROJECT: 650460- TYPE WORK: REPLACE BRIDGE
ROME TIP # L-89-04
LENGTH (miles 1 km)
'DESCRPT: SR 101 OVER ETOWAH RIVER IN ROME
EXIST. LANES: 04 PROPOSED LANES: 05
FUND: BRIDGE
PE: 1993
0.37/0.60
ROW: 1999
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY
$5,049,000 . $4,039,200 $1,009,800
PROJECT: 650540- TYPE WORK: WIDENING
FUND: STP
ROME TIP #
LENGTH (miles1 km) 0.41/0.66
DESCRPT: SR 101/2ND AVENUE FROM WEST 3RD STR~ET TO SR 1/20
EXIST. LANES: 03 PROPOSED LANES: 04
PE: 2003 ROW: CST:
$143,000 AFTER 2003 AFTER 2003
PROJECT: 650550- TYPE WORK: MINOR WIDEN & RESURF
FUND: STP
ROME TIP #
LENGTH (miles 1 km) 0.59/0.95
DESCRPT: CS 7721N. 2ND AVE FROM SHORTER AVE TO JOHN DAVENPORT DRIVE
PE:2003 ROW: LOCL CST:
$44,000
.AFTER 2003
,
PROJECT: 650610- TYPE WORK: TURN LANES
, ROME TIP #
LENGTH (miles 1 km)
DESCRPT: SR ILP AT CR 796/0LD CALHOUN ROAD IN ROME
LUMP SUM PROJECT
FUND: STP 0.2/0.32
PE: 2001 ROW: LOCL CST: 2003 FED Share: GA Share:
$32,000
$67,000 $60,300 $6,700
Page 140 of336
_ _._-_.__-_. - STATE ,TRANSPORTATIONIMPROVEMENTPROGRAM
..
..
-,-~--, . ."" ._.9,/-2-1_/00.-, ,,-------,----
FLOYD COUNTY
PROJECT: 662420- TYPE WORK: WIDENING
FUND: STATE
ROME TIP # L-89-06
LENGTH (miles / km)' 4 /6.44
DESCRPT: SR 746/SE ROME BYP FM SR 101 NE ALONG 4 EXIST RDS TO US 411
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 66Y420-
PE: 1993 ROW: 2002 CST:
UNDERWAY $18,100,000
.'
AFTER 2003
PROJECT: 671110- TYPE WORK: SIGNING'
FUND: FOREST HWY PE: 1999
LENGTH (miles/km) 6.2/9.98
ROW: NONE
DESCRPT: CALHOUN GAP RD/CR 21OICR 194 FM CR 641 TO CR 482/GORDON
CST: 200 I FED Share:
ASSOCIATED PROJECTS: 67111X-
UNDERWAY
$10,000 $10,000
PROJECT: 6V7024- TYPE WORK: CAPITAL
ROME TIP #
LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$25,000 $25,000 $6,000
PROJECT: TOOOl60 TYPE WORK: CAPITAL
ROME TIP #
LENGTH (miles / km)
DESCRPT: FY 2002 ROME SECTION 5310 CAPITAL
FUND: TRANSIT
PE: NONE
0/0,00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$26,000 $26,000
$7,000
PROJECT: TOOOl99 TYPE WORK: CAPITAL
ROME TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 ROME SECTION 5310 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$27,000 $27,000 $7,000
PROJECT: T000201 TYPE WORK: CAPITAL
ROME TIP #
LENGTH (miles / km)
DESCRPT: FY 2001 ROME SECTION 5307 CAPITAL
PROJECT: T000202 TYPE WORK: CAPITAL
ROME TIP#
LENGTH (miles / km)
DESCRPT: FY 2002 ROME SECTION 5307 CAPITAL
PROJECT: T000203 TYPE WORK: CAPITAL
ROME TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 ROME SECTION 5307 CAPITAL
r
t~~;~~:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTHShare:
$202,000 $149,000
$19,000 $53,000
$89,000 $79,000 $10,000 $10,000
$63,000 $56,000 $7,000 $7,000
Page 141 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9121100
FLOYD COUNTY
PROJECT: T000204 TYPE WORK: CAPIT AL
ROME TIP #
LENGTH (miles / km)
DESCRPT: FY 2001 ROME SECTION 5309 CAPITAL
PROJECT: T000205 TYPE WORK: CAPITAL
ROME TIP #
LENGTH (miles / km)
DESCRPT: FY 2002 ROME SECTION 5309 CAPITAL
PROJECT: T000206 TYPE WORK: . CAPITAL
ROME TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 ROME SECTION 5309 CAPITAL
PROJECT: T000207 TYPE WORK,: OPERATING
ROME TIP #
. LENGTH (miles / km)
. DESCRPT: FY 200 I ROME SECTION 5307 OPERATING
PROJECT: T000208 TYPE WORK: OPERATING
ROME TIP #
LENGTH(miles / km)
DESCRPT: FY 2002 ROME SECTION 5307 OPERATING
. PROJECT: T000209 TYPE WORK: OPERATING
ROME TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 ROME SECTION 5307 OPERATING
FUND: TRANSIT
PE: NONE
010.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
. CST: 2002
FED Share:
GA Share:
OTHShare:
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
FUND: TRANSIT
PE: NONE
010.00
ROW: NONE
CST: 2001
FED Share:
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
OTHShare:
FUND: TRANSIT. PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
OTH Share:
$198,000 $176,000 $22,000
$22,000
$198,000 $176,000
$22,000 $22,000
$198,000 $176,000
$22,000 $22,000
/ i I'
$1,247,000 $377,000
$870,000
$1,310,000 $377,000
$933,000
$1,376,000 $377,000
$999,000
c :.',1'' ..~... ~C:,~? ~>:..
Page 142 of336
___"''-_..
STATE TRANSPORTATION IMPROVEMENT PROGRAM
''
9'/2.1_./.,0_0r.,_._'. .'_._._...__. _._.... ._ ...,_,_.,__ '
~_"',
. ._._ _
FORSYTH COUNTY
PROJECT: 0000137 TYPE WORK: SIDEWALKS LENGTH (miles / km)
DESCRPT: CUMMING SIDEWALKS
FUND: STP 0/0,00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000811 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 1.2 / 1.93
DESCRPT: SR 369 AT 6 INTERSECTIONS BT BETHEL RD AND SHADY GROVE RD
LUMP SUM PROJECT
OTH Share:
PE: 2000 ROW: CST:
$500,000 $400,000
$100,000
UNDERWAY AFTER 2003 AFTER 2003
PROJECT: 0000812 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.6/0.97
DESCRPT: SR 306@SR 53; SR 306@SHADBURN/PARKS; SR 306@ WALDRIP RD
LUMP SUM PROJECT
PE: 2000 ROW: CST:
UNDERWAY AFTER 2003 AFTER 2003
PROJECT: 122250- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 20 FM SR 400 TO SAMPLE ROAD/CR 80 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 132630-
FUND:STP 2.29/3.69
PE: 1992 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $13,145,000
$4,382,000 $3,505,600
$876,400
t.... PROJECT: 132630- TYPE WORK: INTERCHANGE
FUND:NHS
PE: 1992
-"
UNDERWAY
LENGTH (miles / km) 0.2/0.32
ROW: 2001
$3,385,000
,DESCRPT: SR 400 AT SR 20 INTERCHANGE RECONSTRUCTION
CST: 2002
$6,201,000
FED Share:
$4,960,800
ASSOCIATED PROJECTS: 122250-
GA Share:
$1,240,200
PROJECT: 132940- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles/km) 0.5/0.81
DESCRPT: SR 400/US 19 AT SETTING DOWN ROAD/CR 176 NE OF CUMMING
LUMP SUM PROJECT
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$361,000 $324,900
$36,100
PROJECT: 13298X- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0/0.00
DESCRPT: SR20 @ CHAITAHOOCHEE RIVER@FORSYTH CO LNISEE GWINNEIT 132985
ASSOCIATED PROJECTS: 132985-
PE:NONE ROW: NONE CST: NONE
PROJECT: 141870- TYPE WORK: INTERCHANGE
FUND: STP
PE: 2001
LENGTH (miles / km) 0.5 /0.81
ROW: 2002
DESCRPT: SR 400 AT MCFARLAND ROAD INTERCHANGE RECONSTRUCTION .~"
(
L~)~
CST: 2003 FED Share:
GA Share:
$5,000 $2,000,000 $5,760,000 $4,608,000 $1,152,000
Page 143 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FORSYTH COUNTY
.-';.
PROJECT: 142300- .TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
lli
LENGTH (miles 1 km) 0.2/0.32
PE: 1999 ROW: LOCL
UNDERWAY
DESCRPT: SR 371 AT KELL Y MILL' ROAD/CR 5
'
CST: 2001
$394,000
LUMP SUM PROJECT
FED Share:
$354,600
GA Share:
$39,400
...
( l._~::-~
Page 144 of336
_ _ lOa ,
STATE TRANSPORTATION IMPROVEMENT PROGRAM
" _ _._~"_"'
9/21/00
I._:CO."""'-"'_ _"'_"-_'''.''"'''''':
"'lIlL ,
._a-._._*
FRANKLIN COUNTY
PROJECT: 00004XO TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles I km)O 10.00
DESCRPT: 1-85 @ SR 15; SR 63 BANKS & AND SR 51/320/FRANKLIN 0000470
PE:NONE ROW: NONE CST: NONE
ASSOCIATED PROJECTS: 0000470
PROJECT: 0000955 TYPE WORK: BRIDGES
FUND: OTHER
LENGTH (miles I km) O. I 10.16
DESCRPT: SR 8/US 29 NEW PEDESTRIAN BR E OF SPRING STIFRANKLIN SPRINGS
PE:2001 ROW: NONE CST: NONE
_
$75,000
PROJECT: 110780- TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles I km) 0.6 10.97
DESCRPT: 1-85 SAFETY UPGRADES @ SR 106; SR 17 AND SR 77 IN HART CO.
ASSOCIATED PROJECTS: 110782-
PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$9,800,000 $8,820,000
$980,000
PROJECT: 122080- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 4.3 16.92
DESCRPT: SR 17 FM SE CR 67/ROSS PL N LAVONIA TO SE STEPHENS CL & BR
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 12Y080-
PE: 1993 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $2,402,000 $7,000,000 $5,600,000 $1,400,000
PROJECT: 12Y080- TYPE WORK: WIDENING
FUND: 1M
LENGTH (miles I km) 0 10.00
DESCRPT: SR 17[@1-85 RECST INT) FM CR 67/ROSS PL LAVONIA-STEPHENS C
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 122080-
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$500,000 $450,000
$50,000
PROJECT: 133001- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (mlles r km) 0.24/0.39
DESCRPT: SR 145 @ NORTH FORK BROAD RIVER 1.7 MI W FRANKLIN SPRJNGS
PE: 2001 ROW: CST:
$22,000 AFTER 2003 AFTER 2003
PROJECT: 141990- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles I km) 0.22 10.35
ROW: 2000
DESCRPT: SR 145 @NORTH FORK BROAD RIVER NORTH OF CARNESVILLE
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY
$635,000 $508,000 $127,000
PROJECT: 811063- TYPE WORK: WEIGH STATION
FUND: 1M
PE: 1995
UNDERWAY
. LENGTH (miles I km) 0 10.00
ROW: NONE
DESCRPT: UPGRADE 1-85 NB AND SB WEIGH STATIONS INCL SCALE REPLACEMENT
CST: 2001
$5,000,000
~
':
t~ .0;
FED Share: GA Share:
$4,500,000 $500,000
Page 145 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
._---.-. ._-<--_. . _ _., ..--,,---_._9-/2-1_/0.0_. "'- _._/._------
FULTON COUNTY
"
PROJECT: 0000044, TYPE WORK: SIDEWALKS
FUND: STP
,;;'t
ATLANT A TMA TIP # AT AR BP300
LENG!H (miles / km) 0/0.00
DESCRPT: ATLANTA - FAIRLIE/POPLAR STREETSCAPE
PE:LOCL ROW: LOCL CST: 2001
FED Share:
PROJECT: 0000103 TYPE WORK: BICYCLE/PED, FACII.ITY
ATLANTA TMA TIP # FN AR BPI 00
LENGTH (miles / km)
DESl;RPT: ROGERS BRIDGE ROAD MULTI-USE TRAIL PROJECT
FUND: STP 0/0.00
OTHShure:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000104 TYPE WORK: LANDSCAPING
ATLANT A TMA TIP # FN AR BP099
LENGTH (miles I km)
DESCRP~ CRABAPPLESTREETSCAPE
FUND:STP 0/0.00
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000105 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FN AR BP098
LENGTH (miles / km)
DESCRPT: VICKERY CREEK UNIT (NPS) PED BRIDGES
OTHShare:
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 '. FED Share:
PROJECT: 0000106 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # GW AR BP097
LENGTH (miles / km)
DESCRPT: ROGERS BRIDGE TRAIL IN FULTON & GWINNETT
FUND: STP 0/0.00
OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000181 TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # AT AR BP299 .
LENGTH (miles / km)
DESCRPT: ATLANTA - CASCADE/MAYS STREETSCAPE
FUND: STP 0/0.00
OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 0000183 TYPE WORK: LANDSCAPING
PUND: STP
PE: LOCL
ATLANTA TMA TIP# AT AR BP298
LENGTH (miles/km) 0/0.00
ROW: LOCL
DESCRPT: ATLANTA - JOHN LEWIS COMMEMORATIVE PK GATEWAY TO FREEDOM PK
CST: 200 I
FED Share:
.,~..: ,
4:.s::.:::
PROJECT: 0000184 TYPE WORK: SIDEWALKS
. FUND: STP
ATLANTA TMA TIP # AT AR BP297
LENGTH (miles / km) 0/0.00
DESCRPT: ATLANTA - LAKEWOOD HEIGHTS TOWN CENTER STREETSCAPE
OTHShure:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
$1,200,000 $960,000 $240,000
$1,500,000 $1,200,000
$300,000
$1,128,000 $902,000 $226,000
$600,000 $480,000 $120,000
$480,000 $384,000
$96,000
$450,000 $360,000
$90,000
$300,000 $240,000 $60,000
$450,000 $360,000
$90,000
Page 146 of336
- _ _......
.... .
STATE TRANSPORTATION IMPROVEMENT PROGRAM
.. _----9/2-1/0-0 --. . ------_._-
. FULTON COUNTY PROJECT: 0000186 TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # AT AR BP296
LENGTH (miles / km)
DESCRPT: ATLANTA - CHESHIRE BRIDGE ROAD STREETSCAPE
FUND:STP 0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$600,000 $480,000
PROJECT: 0000187 TYPE WORK: SIDEWALKS
ATLANT A TMA TIP # AT AR BP295
LENGTH (miles / km)
DESCRPT: ATLANTA - MEMORIAL PARKffANYARD PK TRAIL
FUND: STP 0/0.00
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$120,000
$224,000 $179,000
PROJECT: 0000189 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FS AR BP081
LENGTH (miles / km)
DESCRPT: ROOSEVELT HWY(US 29) BIKE LANES/SIDEWALKS
FUND: STP 0/0.00
OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$45,000
$150,000 $120,000
PROJECT: 0000191 TYPE WORK: BICYCLE/PED. FACILITY
ATLANT A TMA TIP # FS AR BP082
LENGTH (miles / km)
DESCRPT: FAIRBURN RD SIDEW ALKIBIKE LANES
.-
PROJECT: 0000192 TYPE WORK: LANDSCAPING
ATLANT A TMA TIP # FN AR BP096
LENGTH (miles / km)
DESCRPT: SANDY SPRINGS - ROSWELL RD STREETS CAPE
FUND:STP 0/0.00
OTH Share:
PE: LOCLROW: LOCL CST: 2001 FED Share:
FUND:STP 0/0.00
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$30,000
$750,000 $600,000 $150,000
$600,000 $480,000
PROJECT: 0000193 TYPE WORK: BICYCLE/PED. FACILITY
ATLANT A TMA TIP # FS AR BP083
LENGTH (miles / km)
DESCRPT: UNION CITY STREETSCAPE
FUND: STP 0/0.00
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$120,000
$300,000 $240,000
PROJECT: 0000194 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # AT AR BP294
LENGTH (miles / km)
DESCRPT: ATLANTA SOUTHTOWNE TRAIL PHASE I
FUND: STP 0/0.00
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$60,000
$660,000 $528,000
PROJECT: 0000197 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FS AR BP084
LENGTH (miles / km)
DESCRPT: EAST POINT - MAIN STREET STREETSCAPE ~
r-
~.
~2'-"
FUND:STP 0/0.00
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
$132,000
$150,000 $120,000
$30,000
Page 147 of336
__ ---------------------------------_. ..
. STATE TRANSPORTATIONIMPROVEMENTPROGRAM
9121100
FULTON COUNTY
PROJECT: 0000198 TYPE WORK: INTERSECTION IMPROVEMENT
I
ATLANTA TMA TIP # AR 157
LENGTH (miles / km)
DESCRPT: SR 9 IN ROSWELL AT OXBO STREET
LUMP SUM PROJECT
FUND:STP 0.2/0.32
.'
PROJECT: 0000199 TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # AR 157
LENGTH (miles / km)
DESCRPT: SR 9 IN ROSWELL AT OAK STREET
LUMP SUM PROJECT
FUND:STP 0.2/0.32
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
.$218,000 $196,200 $21,800
UNDERWAY
. $229,000 $206,100
$22,900
PROJECT: 0000200 TYPE WORK: HISTORIC PRESERVATION
ATLANTA TMA TIP # FS AR BP085
LENGTH (miles / km)
DESCRPT: COLLEGE PARK RAIL DEPOT RESTORATION
FUND:STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$354,000 $283,000
OTH Share:
$71,000
PROJECT: 0000201 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FS AR BP086
LENGTH (miles / km)
DESCRPT: EAST POINT - DODSON CONNECTOR BIKE/PED LANES
FUND:STP 0/0.00
PE: LOCL ROW: LOCL . CST: 2001 FED Share:
OTH Share:
$210,000
-. $168,000
$42,000
PROJECT: 0000247 TYPE WORK: TURN LANES
FUND:NHS
ATLANTA TMA TIP # FN AR 203
LENGTH (miles / km) . 0.2/0.32
DESCRPT: 1-285 INTERCHANGE AT ROSWELL ROAD
PE: 2000 ROW: 2001 CST: 2002 FED Share: GA Share:
. UNDERWAY $200,000
$1,100,000 $880,000 $220,000
PROJECT: 0000248 TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FN 191A
LENGTH (miles / km)
DESCRPT: SR 9/ROSWELL ROAD AT DUNWOODY PLACE
FUND:HPP 0.2/0.32
PE: 1999 ROW:-LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 0000249 TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FN 191B
LENGTH (miles / km)
DESCRPT: SR 9/ROSWELL ROAD AT NORTHRIDGE ROAD
FUND:HPP 0.2/0.32
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 0000251 TYPE WORK: INTERSECTION IMPROVEMENT' FUND:HPP
PE: 1999
UNDERWAY
ATLANTATMA TIP# FN 1910
LENGTH (mileslkm) 0.2/0.32
ROW: LOCL
DESCRPT: SR 140/ARNOLD MILL ROAD AT GREEN ROAD
CST: 2001
$400,000
FED Shure:
$320,000
~~..;.)
GA Share:
$80,000
Page J 48 of336
STATE TRANSPORTATIONIMPROVEMENT PROGRAM
--,--,._---_.__.__.. 9/21/00 _-~-~>:&--..--,
-_.--_. " . ._--_. . .__. -
FULTON COUNTY
PROJECT: 0000252 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: HPP
PE: 1999 .
ATLANTA TMA TIP # FN 191E
. LENGTH (miles 1 km) 0.2 10.32
ROW: LOCL
DESCRPT: SR I40/HOLCOMB BRIDGE ROAD AT HOUZE ROADI ALPHARETTA HIGHWAY
CST: 200 I
FED Share:
GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 0000253 TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FN 191F
LENGTH (miles 1 km)
DESCRPT: SR 9/CUMMING HIGHWA Y AT WEBB ROAD
FUND:HPP 0.2/0.32
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 0000254 TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FN 191G
LENGTH (miles 1 km)
DESCRPT: MCGINNIS FERRY ROAD/CR 1319 AT DOUGLAS ROAD
FUND:HPP 0.2/0.32
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 0000255 TYPE WORK: INTERSECTION IMPROVEMENT
. ATLANTA TMA TIP # FN 191H
LENGTH (mileslkm)
DESCRPT: RUCKER ROAD/CR 1331 AT HARRIS ROAD
FUND:HPP 0.2/0.32
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 0000256 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: HPP
ATLANTA TMA TIP# FN 1911
LENGTH (miles Zkm) 0.2/0.32
DESCRPT: MCGINNIS FERRY ROAD/CR 1319 AT WINDWARD PARKWAY
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 0000257 TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FN 191J
LENGTH (mileslkm)
. DESCRPT: MCGINNIS FERRY ROAD/CR 13I 9 AT UNION HILL ROAD
FUND: HPP 0.210.32
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 0000258 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: HPP
ATLANTA TMA TIP # FN 191K
LENGTH (miles r km) 0.2/0.32
DESCRPT: MCGINNIS FERRY ROAD/CR 41 AT WINDWARD CONCOURSE
'PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
::
(" .
~..:
PROJECT: 0000259 TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FN 191L
LENGTH (miles 1 km)
DESCRPT: JONES BRIDGE ROAD/CR 65 AT DOUGLAS ROAD
FUND: HPP 0.2/0.32
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:'
UNDERWAY
$400,000 $320,000
$80,000
UNDERWAY
$400,000 $320,000
$80,000
Page 149 of336
---- ---_._-----------------
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00
..- . , . . - " " " ' - - ' . . , " " - '...- - . , . , . " ".. ~-""""":;~".--""'-,.-<
-.~--'-''''.--'''''------_0
-,_,_ti<_.
~ AI_.__..
,
FULTON COUNTY
PROJECT: 0000337 'TYPE WORK: SIDEWALKS
FUND: STP
PE: NONE
ATLANTA TMA TIP # AT AR BP301
LENGTH (miles/km) 0/0.00
ROW: NONE
DESCRPT: EAST WESLEY SIDEWALK FM PEACHTREE RD TO PIEDMONT RD&BIKE/PED
CST: 2001
FED Share:
$1,250,000 $1,000,000
PROJECT: 0000338 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FN AR BPI02
LENGTH (miles/km)
DESCRPT: WILLEO/COLEMAN ROAD - BIKE/PED
FUND: STP 0/0.00
OTHShare:
PE: LOCL ROW: NONE CST: 2001 FED Share:
$250,000
$350,000 $280,000
PROJECT: 0000351 TYPE WORK: RIDE SHARING
ATLANTA TMA TIP # AR 220C
LENGTH (miles / km)
DESCRPT: UNIVERSITY RIDESHARE PROG YEAR 3
OTH Share:
FUND:CMAQ 0/0.00
PE: 2001 ROW: NONE CST: NONE
$70,000 $250,000
PROJECT: 0000371 TYPE WORK: PVMNT MARKINGS
ATLANTA TMA TIP # AR 130P
LENGTH (miles / km)
DESCRPT: PAVEMI,::NT MARKINGS TO DESIGNATE TRUCKLANES
LUMP SUM PROJECT
FUND: 1M 0/0.00
PE: 2000 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$1,500,000
$1,350,000
$150,000
.~
PROJECT: 0000373 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: 1M
ATLANTATMATIP#AR 130P
LENGTH (miles/km) 0/0.00
DESCRPT: 1-285/1-20 INTERMEDIATE SOLUTION TO REDUCE ,TRUCK OVERTURNING
PE: 2000 ROW: NONE CST: 2001 FEDShllre: GA Share:
UNDERWAY
$1,500,000 $1,350,000
$150,000
PROJECT: 0000376 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: NHS
ATLANTA TMA TIP # AR 359B
LENGTH (miles / km) 0/0.00
DESCRPT: ADDED ENFORCEMENT TO REDUCE TRUCK SPEEDING; TAILGATING; ETC.
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$500,000 $400,000 $100,000
PROJECT: 0000377 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: NHS
ATLANTATMA TIP#AR359A
LENGTH (miles/km) 0/0.00
DESCRPT: PROMOTIONAL CAMPAIGN TO REDUCE TRUCKS DURING RUSH HOUR
PE: 2000 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 0000394 TYPE WORK: SPECIAL STUDIES
FUND: NHS
ATLANTA TMA TIP # AR 373
LENGTH (miles / km) . 0/0.00
DESCRPT: STUDY OF HOURLY TRUCK MOVEMENTS AROUND ATLANTA
PE: 2001 ROW: NONE CST: NONE
$600,000
Page 150 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00 ._--_._-_._--------
FULTON COUNTY
PROJECT: 0000490 TYPE WORK: RAIL PROJECTS
ATLANTA TMA TIP # AR 3440
LENGTH (miles I km}
DESCRPT: COMMUTER RAIL PROGRAM MANAGEMENT - PHASE 4 PROPOSED TCM
FUND: OTHER 010.00
. PE: 2003 ROW: NONE CST: NONE
$2,000,000
PROJECT: 0000491 TYPE WORK: VEHICLE PURCHASES
FUND:NHS
ATLANTA TMA TIP # AR 268A2
LENGTH (miles I km) 0 10.00
DESCRPT: COMMUTER RAIL ATLANTA TO GRIFFIN TRAINSET PURCHASE FOR 2001
PROPOSED TCM
.
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$15,000,000 $12,000,000
$3,000,000
PROJECT: 0000492 TYPE WORK: VEHICLE PURCHASES
FUND: NHS
ATLANTA TMA TIP # AR 268B2
LENGTH (mileslkm) 010.00
DESCRPT: COMMUTER RAIL ATLANTA TO GRIFFIN TRAIN SET PURCHASE FOR 2002 PROPOSED TCM
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:'
$15,000,000 $12,000,000
$3,000,000
PROJECT: 0000493 TYPE WORK: VEHICLE PURCHASES
FUND: NHS
PE:NONE
ATLANTA TMA TIP # AR 269A2A
LENGTH (mileslkm) 010.00
ROW: NONE
DESCRPT: COMMUTER RAIL ATLANTA TO ATHENS TRAIN SET PURCHASE FOR 200 I; Y
CST: 2001
PROPOSED TCM
FED Share:
ASSOCIATED PROJECTS: 00Y0493
GA Share:
$17,500,000 $14,000,000
$3,500,000
PROJECT: 0000494 TYPE WORK: VEHICLE PURCHASES
FUND: NHS
ATLANTA TMA TIP # AR 269B2
LENGTH (miles I km) 0 10.00
DESCRPT: COMMUTER RAIL ATLANTA TO ATHENS TRAINSET PURCHASE FOR 2002 PROPOSED TCM
PE:NONE ROW.' NONE CST: 2002 FED Share: GA Share:
$29,000,000 $23,200,000
$5,800,000
PROJECT: 0000524 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 2870
LENGTH (miles I km) 0 10.00
DESCRPT: MEASUREMENT OF AIR QUALITY INITIATIVES (PSG; CC; CAC)
PE:2003 ROW: NONE CST: NONE
$800,000
PROJECT: 0000537 TYPE WORK: LANDSCAPING
ATLANTA TMA TIP # FS AR BP080
LENGTH (miles I km)
DESCRPT: PALMETTO STREETSCAPE
FUND: STP 010.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000547 TYPE WORK: MISCELLANEO~S IMPROVEMENTS FUND: STP
ATLANTA TMA TIP.# AR 300C
LENGTH (miles Zkm) 010.00
DESeRPT: PARTNERSHIP FOR A SMOG-FREE GEORGIA (PSG) PHASE 6
OTHShare:
PE:2003 ROW: NONE CST: NONE
$180,000 $144,000
$36,000 $1,500,000
Page 151 of336
__ _-------- ----_. .._--
._----------_._----
__ __.----- _-_._ STATE TRANSPORTATION IMPROVEMENT PROGRAM
.."--_._-. ._. ._----~~----,--_._-_
9/21/00
__ ... .... ~-_ _.~~.
..~--
FULTON COUNTY
PROJECT: 0000548 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP
ATLANTA TMA TIP # AR 346B
LENGTH (miles / km) 0/0.00
DESCRPT: ACTIVITY CENTERfTOWN CENTER INVESTMENT POLICY STUDIES: YR, 2
PE: 2001 ROW: NONE CST: NONE
$1,250,000
PROJECT: 0000549 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP
ATLANTA TMA TIP # AR 346C
LENGTH (miles / km) 0/0.00
DESCRPT: ACTIVITY CENTERfTOWN CENTER INVESTMENT POLICY STUDIES: YR 3
PE: 2002 ROW: NONE CST: NONE
$1,250,000
PROJECT: 0000550. TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP
ATLANTA TMA TIP # AR 3460
LENGTH (miles/km) 0/0.00
DESCRPT: ACTIVITY CENTERfTOWN CENTER INVESTMENT POLICY STUDIES: YR 4
PE: 2003 ROW: NONE CST: NONE
$1,250,000
PROJECT: 000055 I TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP
PE:NONE
ATLANTA TMA TIP # AR 361A
LENGTH (miles I km) 0/0.00
ROW: NONE
DESCRPT: ACTIVITYffOWN CENTER INVESTMENT POLICY STUDIES:IMPLEMENT:YRI
CST: 2003
$20,000,000
FED Share:
$16,000,000
.,
OTH Share:
$4,000,000
PROJECT: 0000552 TYPE WORK: TRANSIT FACILITIES
FUND: STP
ATLANTA TMA TIP # AR 362
LENGTH (miles / km) 0/0.00
DESCRPT: BUCKHEAD MAINTENANCE FACILITY FOR SHUTTLE SYSTEM
PE:NONE ROW: NONE CST: 2003 FED Share:
$620,000 $496,000
PROJECT: 0000553 TYPE WORK:, VEHICLE PURCHASES
ATLANTA TMA TIP # AR 375
LENGTH (miles / km)
DESCRPT: REGIONAL BUS PURCHASE: 60 eNG BUSES
FUND: ~TP 0/0.00
OTHShare:
PE: NONE ROW: NONE CST:2001 . FED Share:
$124,000
$20,000,000 $16,000,000
PROJECT: 0000554 TYPE WORK: B!CYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # AT 18.8
'. LENGTH (miles / km) 0.5 /0.81
DESCRPT: ALEXANDER ST CORRIDOR IMPR FM W. PEACHTREE ST TO LUCKIE ST
OTH Share:
PE:LOCL ROW: LOCL ,CST: 2001 FED Share:
$4,000,000
. $5,000,000 $4,000,000
PROJECT: 0000563 TYPE WORK: PARK & RIDE LOJ
FUND: STP
ATLANTA TMA TIP # MA AR 266
t' LENGTH (miles I km)
0 /0.00
DESCRPT: MARTA PARK AND RIDE LOT SR 400 AT WINDWARD PK WY
OTHShare:
PE:NONE ROW: NONE CST: 2001 FED Share:
$1,000,000
$1,000,000 $800,000
OTH Share:
$200,000
Page J52 of336
_ _..
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00 .-"'_._ _ _ _ ~
"._::_'~_,:<O."'_.
.._' _......
~ _ u _._._ . '
...
FULTON COUNTY
PROJECT: 0000567 TYPE WORK: RIDE SHARING
ATLANTA TMA TIP # AR 2200
LENGTH (miles / km)
DESCRPT: UNIVERSITY RIDES HARE PROGRAM: YEAR 4
FUND:CMAQ 0/0.00
PE: 2002 ROW: NONE CST: NONE
_
$900,000
PROJECT: 0000568 TYPE WORK: RIDE SHARING
ATLANTA TMA TIP # AR 220E
LENGTH (miles /ikm)
DESCRPT: UNIVERSITY RIDESHARE PROGRAM: YEAR 5
FUND:CMAQ 0/0.00
PE: 2003 ROW: NONE CST: NONE
$900,000
PROJECT: 0000570 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 22 IE
LENGTH (miles / km) 0 /0.00
DESCRPT: START-UP FUNDS TRANSPORTATION MANAGEMENT ASSOCIATIONS: YR 4
PE: 2002 ROW: NONE CST: NONE
$675,000
PROJECT: 0000571 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 221 F
LENGTH (miles / km) 0/0.00
DESCRPT: START-UP FUNDS TRANSPORTATION MANAGEMENT ASSOCIATIONS: YR 5
PE: 2003 ROW: NONE CST: NONE
$1,000,000
'-.>. -
PROJECT: 0000572 TYPE WORK: SPECIAL STUDIES
ATLANTA TMA TIP # AT AR 225
LENGTH (miles / km)
DESCRPT: MORELAND AVE CORRIDOR STUDY
FUND:CMAQ 0/0.00
PE: 2001 ROW: NONE CST: NONE
$75,000
PROJECT: 0000573 TYPE WORK: SPECIAL STUDIES
FUND: CMAQ
ATLANTA TMA TIP # AT AR 226
LENGTH (miles / km) 0 /0.00
DESCRPT: PONCE DE LEON AVE CORRIDOR TRANSPORTATION STUDY
PE: 2001 ROW: NONE CST: NONE
$70,000
PROJECT: 0000574 TYPE WORK: SPECIAL STUDIES
FUND: CMAQ
ATLANTA TMA TIP # AT AR 227
LENGTH (miles/km) 0/0.00
DESCRPT: NORTHSIDE DRIVE CORRIDOR TRANSPORTATION STUDY
PE: 2001 ROW: NONE CST: NONE
$165,000
~.
c~( '. ~:~~.
PROJECT: 0000579 TYPE WORK: MISCELLANEOU~ IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 2800
LENGTH (miles / km) 0/0.00
DESCRPT: ALTERNATE FUEL INFASTRUCTURE DEVELOPMENT PROGRAM - PHASE 4
PE:NONE ROW.'NONE CST: 2001 FED Share:
OTHShare:
$1,000,000 $800,000
$200,000
Page /53 of336
._--_ __ STATE TRANSPORTATION IMPROVEMENT PROGRAM ._. . ----- ---_.--.._---- 9/21/00 --------,--_.._--.
FULTON COUNTY
PROJECT: 0000580 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 280E
LENGTH (miles I km) 0/0.00
DESCRPT: ALTERNATE FUEL INFASTRUCTURE DEVELOPMENT PROGRAM - PHASE 5
PE:NONE ROW: NONE CST: 2002 FED Share:
$1,000,000 . $800,000
OTHShare:
PROJECT: 0000581 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
PE:NONE
. ATLANTA TMA TIP # AR 280F
LENGTH (miles I km) 0 10.00
ROW: NONE
DESCRPT: ALTERNATE FUEL INFASTRUCTURE DEVELOPMENT PROGRAM - PHASE 6
CST: 2003
FED Share:
$200,000
$1,000,000 $800,000
OTHShare:
PROJECT: 0000582 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 285B
LENGTH (mileslkm) 0/0.00
DESCRPT: ALT FUEL VEHICLE INCREMENTAL COST INCENTIVE PRGM - YEAR 2
PE: 2002 ROW: NONE CST: NONE
$200,000 $2,000,000
PROJECT: 0000583 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 285C
LENGTH {miles I km) 0 10.00
DESCRPT: ALT FUEL VEHICLE INCREMENTAL COST INCENTIVE PRGM - YEAR 3
PE: 2003 ROW: NONE CST: NONE
$2,000,000
~, . ' . ,~
PROJECT: 0000584 TYPE WORK: RIDE SHARING
FUND: CMAQ
ATLANTA TMA TIP # AR 290B
LENGTH (miles I km) 0 10.00
DESCRPT: TRANSIT & CARPOOL SUBSIDIES FOR REGIONAL EMPLOYEES: YEAR 2
PE: 2001 ROW: NONE CST: NONE
$25,000
PROJECT: 0000585 TYPE WORK: RIDE SHARING
FUND: CMAQ
ATLANTA TMA TIP # AR 290C
LENGTH (miles I km) 0 10.00
DESCRPT: TRANSIT & CARPOOL SUBSIDIES FOR REGI9NAL EMPLOYEES: YEAR 3
PE: 2002 ROW: NONE CST: NONE
$25,000
PROJECT: 0000586 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: C,MAQ
ATLANTA TMA TIP #AR 291C
LENGTH (miles rkm) 0/0.00
DESCRPT: STATE .EMPLOYEE COMMUTER ASSISTANCE &TRANSIT INCENTIVE PR.PH4
PE: 2003 . Ro'W:NONE
CSr':NONE
. $500,000
;( ."
LJ:
PROJECT: 0000587. TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTATMA TIP#AR272B
LENGTH (mileslkm) 0/0.00
DESCRPT: TRANSPORTATION MANAGEMENT INITIATIVE:PH 2 EMPLOYER ASSIST.
PE: 2002 ROW: NONE CST: NONE
, $300,000
Page 154 of336
-------------- ._--'----------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
-----------,-"-,-_._--,------_.,~---~--_._---
FULTON COUNTY
PROJECT: 0000588 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 272C
LENGTH (miJes/km) 010.00
DESCRPT: TRANSPORTAnON MANAGEMENT INITIATIVE:PH 3 EMPLOYER ASSIST.
PE:2003 ROW: NONE CST: NONE
$300,000
PROJECT: 0000589 TYPE WORK: RIDE SHARING
FUND: CMAQ
ATLANTA TMA TIP # AR 296B
LENGTH (miles I km) 0/0.00
DESCRPT: REGIONAL VANPOOL SUBSIDY PROGRAM-50 VANPOOLS: YEAR 2
PE: 2002 ROW: NONE CST: NONE
$300,000
PROJECT: 0000590 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANT A TMA TIP # AR 2970
LENGTH (miles / km) 0 /0.00
DESCRPT: CLEAN AIR CAMPAIGN EDUCATION AND OUTREACH: YEAR 6
PE: 2003 ROW: NONE CST: NONE
$3,000,000
PROJECT: 0000591 TYPE WORK: VEHICLE PURCHASES
FUND: CMAQ
PE:NONE
ATLANTA TMA TIP # AR 365
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: SCAT: PURCHASE 9 REGIONAL ALTERNATIVE FUELED BUSES
CST: 2002
FED Share:
$2,363,000 $1,890,000
.~: .
OTH Share:
-t. ~~ ..
PROJECT: 0000592 TYPE WORK: SPECIAL STUDIES
FUND:CMAQ
PE: 2001
ATLANTA TMA TIP # AR 367 A
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: REGIONAL TRAFFIC NEEDS STUDY: PHASE I
CST: NONE
$473,000 $2,000,000
PROJECT: 0000593 TYPE WORK: SPECIAL STUDIES
ATLANTA TMA TIP # AR 367B
LENGTH (miles / km)
DESCRPT: REGIONAL TRAFFIC NEEDS STUDY: PHASE 2
FUND:CMAQ 0/0.00
PE: 2002 ROW: NONE CST: NONE
$1,100,000
PROJECT: 0000594 TYPE WORK: SPECIAL STUDIES
ATLANTA TMA TIP # AR 367C
LENGTH (miles / km)
DESCRPT: REGIONAL TRAFFIC NEEDS STUDY: PHASE 3
FUND:CMAQ 0/0.00
PE:2003 ROW: NONE CST: NONE
$500,000
~
u~
PROJECT: 0000595 TYPE WORK: RIDE SHARING
ATLANTA TMA TIP # AR 368
LENGTH (miles / km)
DESCRPT: REGIONAL 13 COUNTY VANPOOL PROGRAM
FUND: CMAQ
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Shure:
OTH Shure:
$3,000,000 $2,400,000
$600,000
Page J55 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FULTON COUNTY
PROJECT: 0000596 TYPE WORK: SPECIAL,STUDIES
ATLANTA TMA TIP # AR 369A
LENGTH (miles I km}
DESCRPT: PERIMETER RAIL CIRCULATOR ANAL YSIS: PHASE I
FUND:CMAQ 010.00
PE:2001 ROW: NONE CST: NONE
$800,000
PROJECT: 0000597 TYPE WORK: SPECIAL STUDIES
ATLANTA TMA TIP # AR 369B
~ LENGTH (miles I km)
DESCRPT: PERIMETER RAIL CIRCULATOR ANALYSIS: PHASE 2
FUND:CMAQ 010.00
PE: 2002 ROW: NONE CST: NONE
$1,200,000
PROJECT: 0000600 TYPE WORK: SPECIAL STUDIES
FUND: CMAQ .
ATLANTA TMA TIP # AR 371A
LENGTH (mileslkm) 010.00
DESCRPT: ARTS CENTER TO CUMBERLAND RAIL ANAL YSIS; PHASE I
PE: 2001 ROW: NONE CST: NONE
$1,200,000
PROJECT: 0000601 TYPE WORK: SPECIAL STUDIES
FUND: CMAQ
ATLANTA TMA TIP # AR 371B
LENGTH (mileslkm) 010.00
DESCRPT: ARTS CENTER TO CUMBERLAND RAIL ANAL YSIS; PHASE 2
PE:2002 ROW: NONE CST: NONE
$2,000,000
PROJECT: 0000602 TYPE WORK: SIGNING
ATLANTA TMA TIP # AR 374
LENGTH (miles I km)
DESCRPT: BUCKHEAD COMMUNITY SHUTTLE (PR & SIGNAGE)
FUND: CMAQ.
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
OTHShare:
PROJECT: 0000603 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ .
ATLANTA TMA TIP # AT AR BP290A
LENGTH (miles I km) 0 10.00
DESCRPT: PEDESTRIAN ~AFETY; AWARENESS & PROMOTION CAMPAIGN; PHASE 2
PE: 2001 ROW: NONE CST: NONE
$215,000 $172,000
$43,000 $100,000
PROJECT: 0000604 TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # AT AR BP050
LENGTH (mileslkm) 0.28/0.45
ROW: LOCL
DESCRPT: VANlRA AVE SIDEWALKS FM CAPITOL AVE TO CONNELEY ST
CST: 2003
FED Share:
OTHShare:
PROJECT: 0000605 TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # AT AR BP102
LENGTH (miles I km) 0.84 11.35
ROW: LOCL
DESCRPT: BOULEVARD AVE SIDEWALKS FM MCDONOUGH TO HAMIL TON
CST: 2003
FED Share:
OTH Share:
$64,000 $51,000 $13,000
$144,000 $115,000 $29,000
Page 156 of336
STATE TRANSPORTATION IJlrIPROVEMENT PROGRAM
9/21/00 --------------,-------_._--~~----....._ ~---~---_._--
FULTON COUNTY
PROJECT: 0000606 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
.!!
ATLANTA TMA TIP # AT AR BPI 06A.
LENGTH (miles I km) 0 10.00 .
PE:NONE ROW: NONE
DESCRPT: BUCKHEAD PED NETWORK: PH I ACCESS TO MARTA RAIL
CST: 2003
FED Share:
$240,000 $192,000
OTHShare:
PROJECT: 0000607 TYPE WORK: SIDEWALKS
FUND: CMAQ
ATLANTA TMA TIP # AT AR BPI20
LENGTH (mileslkm) 3.23/5.20
DESCRPT: HOLLYWOOD RD SIDEWALKS FM BOLTON RD TO BANKHEAD HWY/SR 8
PE:LOCL ROW: LOCL CST: 2003 FED Share:
$48,000
. $480,000 $384,000
OTHShare:
PROJECT: 0000608 TYPE WORK: 'SIDEWALKS
FUND:CMAQ
PE:LOCL
ATLANTA TMA TIP# AT AR BPI27
LENGTH (mileslkm) 3.3/5.31
ROW: LOCL
DESCRPT: MEMORIAL DR SIDEWALKS FM MORELAND AVE/SR 42 TO CANDLER RD
CST: 2003
FED Share:
$96,000
$512,000 $410,000
OTHShare:
PROJECT: 0000609 TYPE WORK: SIDEWALKS
FUND:CMAQ
PE: LOCL
ATLANTA TMA TIP # AT AR BPI32
LENGTH (mileslkm) 2.78/4.48
ROW: LOCL
DESCRPT: ROSWELL RDISR 9 SIDEWALKS FM PEACHTREE RD TO ATLANTA CITY LJ
CST: 2003
FEDShare~
$102,000
$240,000 $192,000
OTHShare:
PROJECT: 0000610 TYPE WORK: SIDEWALKS
FUND:CMAQ
PE:LOCL
ATLANTA TMA TIP # AT AR BPI53
. LENGTH (miles/km) 1.75/2.82
ROW: LOCL
DESCRPT: CHILDRESS DR SIDEWALKS FM CASCADE RD TO CAMPBELL TON RD
CST: 2003
FED Share:
$48,000
$320,000 $256,000
OTHShare:
PROJECT: 000061 I TYPE WORK: SIDEWALKS
FUND: CMAQ
PE:LOCL
ATLANTA TMA TIP # AT AR BPI 54
LENGTH (miles./ km) 1.211 1.95
ROW: LOCL
DESCRPT: COLLIER RD SIDEWALKS FM HOWELL MILL TO PEACHTREE RD
CST: 2003
FED Share:
$64,000
$200,000 $160,000
OTH Share:
PROJECT: 0000612 TYPE WORK: SIDEWALKS
FUND:CMAQ
PE: LOCL
ATLANTA TMA TIP # AT AR BPI57
LENGTH (mileslkm) 0.54/0.87
ROW: LOCL
DESCRPT: DILL AVE SIDEWALKS FM METROPOLITAN PKWY TO SYLVAN RD
CST: 2003
FED Share:
$40,000
$96,000 $77,000
OTHShare:
PROJECT: 0000613 TYPE WORK: SIDEWALKS
FUND:CMAQ
PE:LOCL
ATLANTA TMA TIP # AT AR BPI79
LENGTH (mileslkm) 0.46/0.74
ROW: LOCL
DESCRPT: LAWTON ST SIDEWALKS FM OGLETHORPE AVE TO LUCILLE AVE
CST: 2002
FED Share:
$19,000
$80,000 $64,000
OTHShare:
$16,000
Page J57 of336
,--,-~-~~~~--------------,~~-~=,..,---,----.,.----------~--
-------_._---
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9121100
FULTON COUNTY
PROJECT: 0000614 TYPE WORK: SIDEWALKS
FUND:CMAQ
ATLANTA TMA TIP # AT AR BP209
LENGTH (miles / km) 0.9/1.45
PE:LOCL ROW: LOCL
DESCRPT: WILSON MILL RD SIDEWALKS FM BAKERS FERRY RD TO BOULDER PK DR
CST: 2003
FED Share:
OTHShare:
PROJECT: 0000637 TYPE WORK: SPECIAL STUDIES
FUND: CMAQ
ATLANTA TMA TIP # AT AR 228
LENGTH (miles / kin) 0/0.00
DESCRPT: MARTIN LUTHER KING DRIVE CORRIDOR TRANSPORTATION STUDY
PE: 2003 ROW: NONE CST: NONE
$112,000 $90,000
$22,000 $250,000
PROJECT: 0000638 TYPE WORK: BlCYCLE/PED. FACILITY
FUND: CMAQ
PE:LOCL
ATLANTA TMA TIP # FN AR BPO13
LENGTH (miles / km) 3 /4.83
ROW: LOCL
DESCRPT: BRUICE & SPRUILL RDS FM OLD ALABAMA RD TO JONES BRIDGE RD
CST: 2003
FED Share:
$650,000 $520,000
OT/i Shure:
$130,000
PROJECT: 0000639 TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE:LOCL
ATLANT A TMA TIP # FN AR BP052
LENGTH (miles / km) 2.2 /3.54
ROW: LOCL
DESCRPT: RIVERSIDE DRIVE BlKE/PED FM JOHNSON FERRY RD'TO 1-285
CST: 2003
$1,800,000
FED Share:
$1,440,000
-.
OTHShare:
$360,000
PROJECT: 0000640 TYPE WORK: BICYCLE/PED. FACILITY
FUND:CMAQ
PE:LOCL
ATLANTA TMA TIP # FN AR BP067
LENGTH (miles / km) 0.9/1.45
ROW: LOCL
DESCRPT: RIVER VALLEY RD FM RIVERSIDE DR TO ABERNATHY RD
CST: 2003
FED Share:
$1,200,000 $960,000
OTH Share:
PROJECT: 0000641 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FS AR BP058 .
LENGTH (miles / km)
DESCRPT: SR I 38/JONESBORO RD FM SHANNON PARKWAY TO 1-85
FUND: CMAQ
PE: LOCL
0.3/0.48
ROW: LOCL
CST: 2003
FED Share:
$240,000
$59,000 $47,000
OTHShare:
PROJECT: 0000642 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FS AR BP059
LENGTH (miles/ km)
DESCRPT: LONDONBERRY BIKEIPED FM SR 138 TO MALL BLVD
FUND: CMAQ
PE: LOCL
0.45/0.72
ROW: LOCL
CST: 2003
FED Share:
$12,000
$117,000 $94,000
OTH Share:
PROJECT: 0000643 TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FS AR BP060
LENGTH (miles / km)
DESCRPT: SHANNON PKWY BIKE/PED FM MALL BLVD TO SR 138
FUND: CMAQ
PE:LOCL
0.32 /0.52
ROW: LOCL
CST: 2003
FED Share:
$23,000
$119,000 $95,000
OTH Share:
$24,000
Page J58 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00
...
,..."..,
"'...._ _
. _..
..
._
~,
~.,.<1<_~
"''''_~_,_~
FULTON COUNTY
PROJECT: 0000644 TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # FS AR BP065
LENGTH (miles 1 km) 3.12/5.02
ROW:LOcL'
DESCRPT: SR 1381J0NESBORO RD/BEVE INGRAM FM ROOSEVELT TO BUFFINGTON
CST: 2003
FED Share:
$637,000 $510,000
OTH Share:
PROJECT: 0000645 TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: LOCL
ATLANT A TMA TIP # FS AR BPOn
LENGTH (miles 1 km) 1.42/2.29
ROW: LOCL
DESCRPT: CONNELL RD SIDEWALKS FM BETHSAIDA RD TO FLAT SHOALS RD
CST: 2002
FED Share:
$127,000
$350,000 $280,000
OTH Share:
PROJECT: 0000675 TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE:LOCL
ATLANT A TMA TIP # FS AR BP087
LENGTH (miles 1 km) 0/0.00
ROW: LOCL
DESCRPT: BUFFINGTON RD BIKE LANE FM FLAT SHOALS RD TO ROOSEVELT HWY
CST: 2003
FED Share:
$70,000
$2,730,000 $2,184,000
OTHShare:
PROJECT: 0000717 TYPE WORK: SPECIAL STUDIES
FUND: STP
PE: 200i
ATLANTA TMA TIP # AR 30 IA
LENGTH (miles 1 km) 0/0.00
ROW: NONE
DESCRPT: MAG-LEV TRANSPORTATION TECHNOLOGY DEPLOYMENT PROGRAM-PHASE 2 CST: NONE
$546,000 $3,650,000
PROJECT: OOY0493 TYPE WORK: VEHICLE PURCHASES
FUND: HPP
ATLANTA TMA TIP # AR 269A2B
LENGTH (miles 1 km) 010.00
DESCRPT: COMMUTER RAIL ATLANTA TO ATHENS TRAINSET PURCHASE SEE0000493 PROPOSED TCM
ASSOCIATED PROJECTS: 0000493
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
.$12,500,000 $10,000,000
$2,500,000
PROJECT: 713230- TYPE WORK: BRIDGE REHAB
ATLANTA TMA TIP # FN AR 185
LENGTH (miles 1 km)
DESCRPT: 1-285 @ RIVERSIDE DRI TURN LANES
FUND: 1M 0.26/0.42
PE: 1995 ROW: 2001 CST:
UNDERWAY $400,000
AFTER 2003
PROJECT: 713270- TYPE WORK: j3RIDGES
FUND: 1M
ATLANTA TMA TIP # AT AR 2 I I
LENGTH (miles 1 km) I 11.6 I
DESCRPT: 1-75 ~OUTH TO 1-85 NORTH FLY OVER BRIDGE @ BROOKWOOD STATION
EXIST. LANES: 00 PROPOSED LANES: 01
PE:2001 ROW: CST:
$2,800,000 AFTER 2003 AFTER 2003
PROJECT: 713330- TYPE WORK: INTERCHANGE
ATLANTA TMA TIP # AT AR 178
LENGTH (mileslkm)
DESCRPT: 1-285 SOUTH TO 1-20 WEST INTCHG RECST; WIDEN & CD
EXIST. LANES: 00 PROPOSED LANES: 06
FUND: 1M 3.12/5.02
PE: 1995 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $100,000
$5,703,000 $5,132,700
$570,300
Page 159 of336
..._ _
l' t _ '
STATE TRANSPORTATION IMPROVEMENT PROGRAM
rr_..-... 9/21/00
-......................_ _
~':rs<.~'"
.. .....,.
-.k<
~
FULTON COUNTY
PROJECT: 713370- TYPE WORK: ATMSIITS
FUND: STP
ATLANTA TMA TJP # AR 279
LENGTH (miles I km) 9.45 /15.21
DESCRPT: ATMS/I-285 SURVEIL FM 1-20 WIN FULTN N TO 1-75 IN COBB
ASSOCIATED PROJECTS: 71337L- 71Y370-
PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:
UNDERWAY
$5,137,000 $4,109,600 $1,027,400
PROJECT: 713371- TYPE WORK: ATMS/ITS
FUND: CMAQ
ATLANTA TMA TIP # AR 295
LENGTH (miles I km) 10.7 I 17.26
DESCRPT: ATMS/ ]-285 SURVEIL FM 1-85/UNION CITY NORTH TO 1-20 WEST
PE: 2001 ROW: NONE CST:
$100,000 AFTER 2003
PROJECT: 713372- TYPE WORK: ATMS/ITS
FUND: CMAQ
ATLANTA TMA TIP # AR 281
LENGTH (miles I km) 0 10.00
DESCRPT: ATMSII-285 SURVEIL FM J-75/CLAYTON NE THRU FULTN TO J-20/DEK
ASSOCIATED PROJECTS: 713373-
PE:NONE ROW: NONE CST: NONE
PROJECT: 713690- TYPE WORK: INTERCHANGE
ATLANTA TMA TIP # AT AR 214
LENGTH (miles I km}
DESCRPT: 1-285 AT BANKHEAD HIGHWA Y/SR 8/US 78-278
ASSOCIA TED PROJECTS: 750780-
FUND: NHS 0.2 10.32
PE: 1999 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $1,200,000 $4,485,000 $3,588,000 $897,000
PROJECT: 714190- TYPE WORK: BRIDGES
ATLANTA TMA TIP # AT AR 224A
LENGTH (miles I km)
DESCRPT: NEW 17TH STREET BRIDGE OVER 1-75
FUND: NHS 010.00
PE: 200 I ROW: 2002 CST: 2003 FED Share: GA Share:
$5,000 $50,000,000 $26,000,000 $20,800,000
$5,200,000
PROJECT: 71Y370- TYPE WORK: ATMSIITS
FUND: STP
ATLANTA TMA TIP # AR 279
LENGTH (mileslkm) 9.45 115.21
DESCRPT: ATMS/I-285 SURVEIL FM 1-20 W IN FULTN N TO 1-75/COBB 713370-
ASSOCIATED PROJECTS: 713370-
PE: 1999 ROW: NONE CST: 2003 FED Share: GA Share:
UNDERWAY
$4,312,000 $3,449,600
$862,400
PROJECT: 720570- TYPE WORK: MEDIAN WORK
FUND: NHS
ATLANTA TMA TIP # AT 004
LENGTH (miles I km) 0.51 10.82
DESCRPT: DL HOLLOWELL PKWY/SR 8 FM PROCTOR CRK TO E OF CSX R~ BRIDGE
PE: 1993 ROW: 2000 CST: 2001 FED Share: GA Share:
UNDERWAY $2,125,000 $7,709,000 $6,167,200 $1,541,800
PROJECT: 72177X- TYPE WORK: WIDENING
FUND: STP
ATLANTA TMA TIP # DO 019
LENGTH (miles I km) 0 10.00
DESCRPT: SR 166 FM OLD LOWER RIVER RD TO SR 701 SEE DOUGLAS CO
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 721770-
PE:NONE ROW: NONE CST: NONE
Page 160 of336
r-------=======================================================-------STATE TRANSPORTA110N IMPROVEMENT PROGRAM 9/21/00
FULTON COUNTY
PROJECT: 722090- TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FN AR 190 .
LENGTH (miles I km)
DESCRPT: SR 400 AT WINDWARD PARKWAY
FUND: NHS 0.2 10.32
PE: 1999 ROW: 2000 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY $8,874,000 $7,099,200 $1,774,800
PROJECT: 722140- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: HPP
ATLANTA TMA TIP # FN AR 202
LENGTH (miles I km) 0 10.00
DESCRPT: SR 400 MULTIMODAL TRANSPORTATION CORRIDOR STUDY/CONST
ASSOCIATED PROJECTS: 72Y 140-
PE: 2001. ROW: NONE CST:
$5,000,000 AFTER 2003
PROJECT: 730886- TYPE WORK: BRIDGES
FUND: BRIDGE
PE: 1993
ATLANTATMATIP#FN07IA
LENGTH (miles r km) 0.05/0.08
.ROW: LOCL
DESCRPT: STATE BRIDGE RD @ JOHNS CREEK - NEW PARALLEL BRIDGE
CST: 2003
EXIST. LANES: 00 PROPOSED LANES: 02
FED Share:
ASSOCIATED PROJECTS: 730880-
GA Share:
UNDERWAY
$525,000 $420,000 $105,000
PROJECT: 731510- TYPE WORK: ATMSIITS
FUND: CMAQ
PE:NONE
ATLANTA TMA TIP # AR 294A
LENGTH (mileslkm) 6/9.66
ROW: NONE
DESCRPT: ATMS/ SR 154/166 COMM'CTION/SURVEILLANCE FM 1-285 TO 1-75/85
CST: 2002
FED Share:
GA Share:
$5,055,000 $4,044,000 $1,011,000
PROJECT: 73 I830- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # FS 083
LENGTH (miles'; km) 0.2 10.32
DESCRPT: CAMPBELLTON RD/SR 166 @ BOAT ROCKINEW HOPE ROADS
PE: 1999 ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 731835- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # FN 12 I
LENGTH (miles I km) 1.6/2.58
DESCRPT: SR 120/ABBOTTS BRIDGE ROAD AT JONES BRIDGE ROAD
PE: 1999 ROW: LOCL CST: 2001 FED Share: , GA Share:
UNDERWAY
$370,000 $296,000
$74,000
UNDERWAY
$2,000,000 $1,600,000
$400,000
PROJECT: 731860- TYPE WORK: REPLACEBRIDGE
FUND: BRIDGE
ATLANTA TMA TIP.# FS 138
LENGTH (mileslkm) 0.2210.35
DESCRPT: SR 70/CASCADE-PALMETTO @DEEP CREEK 7.5 MI N OF FAIRBURN
PE: 2000 ROW: 2001 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 731870- TYPE WORK: IJ':JTERSECTION IMPROVEMENT
ATLANTA TMA TIP # AR 157
LENGTH (miles I km)
DESCRPT: SR 91N ROSWELL@KING/CHATTAHOOCHEE STREETS
LUMP SUM PROJECT
FUND: STP 0.2 10.32
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$235,000.
$211,500
$23,500
Page 1610/336
STATE TRANSPORTATION IMpROVEMENT PROGRAM
9/21/00
FULTON COUNTY
PROJECT: 731895- TYPE WORK: SIDEWALKS
FUND:CMAQ
ATLANTA TMA TIP # FN AR BP078
LENGTH (miles 1 km) 1.71 12.75
DESCRPT: HOLCOMB BRIDGE RDISR 140 FM SCOTT RD TO BARNWELL RD
PE:LOCL ROW: LOCL CST: 2001
FED Share:
PROJECT: 742482- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # AT AR J 16
LENGTH (miles 1 km) 0.19 10.31
DESCRPT: SR I 66ILAKEWOOD FWY EB EXIT RAMP @ SYLVAN RD
OTH Share:
PE: 2001 ROW: NONE CST:
$625,000 $500,000
$125,000 $5,000
AFTER 2003
PROJECT: 742860- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP #. FN 088
LENGTH (miles 1 km) 1.5212.45
DESCRPT: SPALDING DR FROM MT VERNON RD TO SR 140 @ INTER 174286X
ASSOCIATED PR9JECTS: 74286X-
PE: 1997 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$892,000 $713,600 $178,400
PROJECT: 742970- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # FS 120
LENGTH (miles 1 km) 0.21 0.32
DESCRPT: SR I 54/CASCADE PALMETTO HWY@WILKERSON MILL RD
PE: 1999 ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 742976- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
ATLANTA TMA TIP # FS 142
LENGTH (miles 1 km) 0.2/0.32
ROW: LOCL
DESCRPT: CR I385/BUFFINGTON ROAD@MORNING CREEK TRIB. E/UNION CITY
CST: 2002
FED Share:
GA Share:
UNDERWAY
$250,000 $200,000
$50,000 UNDERWAY
$313,000 $250,400
$62,600
PROJECT: 742990- TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FN 159
LENGTH (miles / km)
DESCRPT: MCGINNIS FERRY RD/CR 1319 AT SARGENT RD/CR 66
FUND: STP 0.2 /0.32
PE: LOCL ROW: 2001 CST: 2001 FED Share:
PROJECT: 750 I05- TYPE WORK: WIDENING
FUND: STP
ATLANTA TMA TIP#AT005
LENGTH (mileslkm) 1.41/2.27
DESCRPT: SR 280IHE HOLMES FM 1-20 TO DL HOLLOWELL PKWY/SR8/US278
EXIST. LANES: 02 PROPOSED LANES: 04
OTHShare:
PE: 2003 ROW: LOCL CST:
$100,000 $375,000 $300,000
$75,000 $568,000
AFTER 2003
PROJECT: 751710- TYPE WORK: WIDENING
FUND: STATE
ATLANTA TMA TIP # ATOl7/FS048
LENGTH (miles / km) 2.1 13.38
DESCRPT: SR 70/FULTON IND BLVD FM INTERCHANGE DR TO SR 8/1NCL CRK BR
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 1994 CST: 2003
GA Share:
UNDERWAY UNDERWAY
$5,557,000
$5,557,000
Page 162 of336
STATE TRANSPORTAl/ON IMPROVEMENT PROGRAM
. 9/21/00
FULTON COUNTY
PROJECT: 752015- TYPE WORK: REPLACE BRIDGE
ATLANTA TMA TIP # AT 070
LENGTH (miles / km)
DESCRPT: COURTLAND ST OVER CSX RR
FUND: BRIDGE
PE: 1992
0.1/0.16
. ROW: LOCL
CST: 2001
FED Share:
GA Share:
. UNDERWAY,
$795,000 $636,000 $159,000
PROJECT: 752020- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1992
ATLANTATMATI~#AT069
' . LENGTH (miles/km) 0.5/0.81
ROW: LOCL
DESCRPT: PEACHTREE ST @ GEORGIA RR & MARTA AT UNDERGROUND ATLANTA
'CST: 2002
FED Share:
GA Share:
. UNDERWAY
$3,509,000 $2,807,200
$701,800
PROJECT: 752030- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 19.92
ATLANTATMATIP#AT068
LENGTH (miles r km) 0.5/0.81
ROW: LOCL
DESCRPT: INTERNATIONAL BLVD@CSX & NORFOLK-SOUTHERN RR@OMNI&75Y030
CST: 2001
FED Share:
ASSOCIATED PROJECTS: .75Y030-
GA Share: .:
UNDERWAY
$4,947,000 $3,957,600
$989,400
PROJECT: 752040- TYPE WORK: REPLACE BRIDGE .
FUND: STP
ATLANTA TMA TIP # AT 009A
LENGTH (miles/km) 0.18/0.29
DESCRPT: ROXBORO RD FM E PACES FERRY RD TO ROCKHAVEN CIR& SOURR BR
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1997 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$5,539,000 $4,431,200 $1,107,800
PROJECT: 752086- TYPE WORK: BRIDGE REHAB
ATLANTA TMA TIP # AT 086A
LENGTH (miles / km)
DESCRPT: SR 999fCS 3586fSPRING STREET OVER CSX RAILROAD
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 752560-
FUND: BRIDGE
PE: 1992
0.5/0.81
ROW: 2000
CST: 2001
FED Share:
GA Share:
UNDERWAY $5,000,000 $2,737,000 $2,189,600
$547,400
PROJECT: 752090- TYPE WORK: WIDENING
FUND: STP
ATLANTATMA TIP # AT 009B
LENGTH (miles Zkm) 0.32/0.52
DESCRPT: ROXBORO ROAD FROM PRICHARD WAY TO EAST PACES FERRY RD
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$1,879,000 $1,503,200
$375,800
PROJECT: 752150- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
PE: 1993
ATLANTA TMA TIP # FN 02 I
LENGTH (miles / km) 0.4 /0.64
ROW: LOCL
DESCRPT: WINDSOR PARK WA YfCR 361 OVER NANCY CREEK .3 MILE EAST SR 400
CST: 2001
FED Share:
GA Share:
UNDERWAY
$963,000 $770,400 $192,600
PROJECT: 752520- TYPE WORK: . REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
ATLANT A TMA TIP # AT 097
LENGTH (miles / km) . 0.29/0.47
ROW: LOCL
DESCRPT: CS I985fMITCHELL STREET@SOUTHERN RAILROAD.2 MI W OF SR 3E
. CST: 2001
FED Share:
GA Share:
UNDERWAY
$3,410,000
$2,728,000 $682,000
Page 163 of336
STATE TRANSPORTAtION IMPROVEMENT PROGRAM
9121100
FULTON COUNTY
PROJECT: 752560- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1998
ATLANTA TMA TIP # AT 086B
LENGTH (miles 1 km) 0.48 10.77
ROW: 2001
DESCRPT: SR 999/CS 3586/SPRING STREET @ SOU RR- CSX RR REPLACEMENT
CST: 2001
FED Share:
ASSOCIATED PROJECTS: 752086-
GA Share:
UNDERWAY $5,000,000 $11,852,000 $9,481,600 $2,370,400
PROJECT: 752570- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
ATLANTA TMA TIP # AT 100
UlNGTH (miles 1 km) 0.22 10.35
ROW: LOCL
DESCRPT: CR 1349/FAIRBURN ROAD @CSX RAILROAD 0l0RTH OF CASCADE RD
CST: 2001
FED Share:
GA Share:
UNDERWAY
$1,167,000 $933,600 $233,400
PROJECT: 752580- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
. ATLANTA TMA TIP # FS 069
LENGTH (miles 1 km) 0.21 10.34
ROW: LOCL
DESCRPT: CR 495/0LD FAIRBURN ROAD @ CAMP CREEK .03MI SCAMP CRK PKY
CST: 2001
EXIST. LANES: 02 PROPOSED LANES: 03
FED Share:
GA Share:
UNDERWAY
$1,407,000 $1,125,600
$281,400
PROJECT: 752860- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANT A TMA TIP # AT 162
LENGTH (miles 1 km) 0.42 10.68
DESCRPT: SR I 54/MEMORIAL DRIVE AT BOULEVARD A VE/CS 520
PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $281,000 $285,000 $228,000 $57,000
PROJECT: 752870- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP#AT 163
LENGTH (miles 1 km) 0.42/0.68
DESCRPT: SR 154/MEMORIAL DRIVE AT MORELAND AVE & DEKALB CO
ASSOCIATED PROJECTS: 75287X-
PE: 1997 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$390,000 $312,000 $78,000
PROJECT: 752960- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
ATLANTATMATIP#FNI74
LENGTH (miles 1 km) 0.2/0.32
ROW: LOCL
DESCRPT: CR I 86/HEMBREE ROAD@ FOE KILLER CREEK 2 MI SW OF ALPHARETTA
CST: 2003
FED Share:
GA Share:
UNDERWAY
$200,000 $160,000
$40,000
PROJECT: 752970- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
ATLANTA TMA TIP # FN 173
LENGTH (miles 1 km) 0.2 10.32
ROW: LOCL
DESCRPT: CR I332/0LD ROSWELL ROAD@FOE KILLER CREEK 2.7 MI S OF ALPH
CST: 2002
FED Share:
GA Share:
UNDERWAY
$400,000 $320,000
$80,000
PROJECT: 752980- TYPE WORK: BRIDGES
FUND: STP
ATLANTA TMA TIP # FS 088
LENGTH (miles 1 km) 0.2/0.32
DESCRPT: FAYETTEVILLE RD/CR 1316 GRADE SEPARATION AT CSX RAILROAD
PE: 1999 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$2,500,000 $2,000,000
$500,000
Page 164 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00 ..--.-......- - . , - - - - . " -...-.""---.-..-""" .."""--_:"..-.., ~ '''''...". _ _'
41._..""_ _"_.0__,.,..,_:,"'"'.,,"",___ ...._."'.."",.,,.,._...
FULTON COUNTY
PROJECT: 753050- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # FS 073
LENGTH (miles / km) 1.31 /2.11
DESCRPT: CR 4 I76/CASCADE RD FM DANFORTH RD TO ALTANTA CITY LIMITS
PE: 1999 ROW: LOCL CST: 2002 FED Share:
UNDERWAY
$600,000 $480,000
OTH Share:
PROJECT: 753052- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP'
ATLANTA TMA TIP # FS 116
LENGTH (miles / km) 2.97/4.78
DESCRPT: FLAT SHOALS RDICR 1384 FM 1-85 TO OLD NATIONAL HWYIADD MEDIAN
PE: 1999 ROW: LOCL CST: 2001 FED Share:
orn ss.o-.
PROJECT: 753054- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # FN 103
LENGTH (miles / km) I. I6/1.87
DESCRPT: GLEN RIDGE DR/CR 351 FM ROSWELL RD TO GLENRIDGE CONN & MEDIAN
PE: LOCL ROW: LOCL CST: 2001 FED Share:
<,
OTH Share:
PROJECT: 753125- TYPE WORK: INTERSECTION IMPROVEMEN~
FUND: STP
ATLANTA TMA TIP # FN 119
LENGTH (miles / km) 0.08 /0.13
DESCRPT: NESBIT FERRY RD/CR 108 @ BRUMBELOW ~D '
PE: 1999 ROW: LOCL CST: 2001 FED Share:
$120,000 UNDERWAY $1,500,000 $1,200,000
$300,000
$600,000 $480,000 $120,000 UNDERWAY $250,000 $200,000
PROJECT: 753130- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # FN 117
LENGTH (miles / km) 0.21 /0.34
DE.SCRPT: NESBIT FERRY ROAD/CR 108 AT SCOTT ROAD
OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
$50,000 UNDERWAY
$280,000 $224,000
PROJECT: 753135- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # FN 118
LENGTH (miles / km) 0.62/1.00
DESCRPT: NESBIT FERRY ROAD/CR 108 AT ARBOR WOODS DRIVE/CR 2608
OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
$56,000 UNDERWAY
$200,000 , $160,000
PROJECT: 753140- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # FS 084
, LENGTH (miles / km) 0.2/0.32
DESCRPT: CASCADE RD/CR 4176 @CARLO WOODS DR/CASCADE OVERLOOK RD
OT/! Share:
PE: 1999 ROW: LOCL CST: 2001 FEDShllre:
$40,000 UNDERWAY
$350,000 $280,000
PROJECT: 753145- TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FS 076
LENGTH (miles / km)
DESCRPT: CAMP CREEK PKWY/SR 6 AT BUTNER RD/CR 1374
FUND: STP 0.2 /0.32
OTHShare:
PE: 1999 ROW: LOCL CST: 2001 FED Share:
$70,000 UNDERWAY
$150,000 $120,000
OTH Share:
$30,000
Page 165 of336
STATE TRANSPORTAI10N IMPROVEMENT PROGRAM
_---,----- 9/21/00
--~'--------'----'----'-" ...
FULTON COUNTY
PROJECT: 753220- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
ATLANTA TMA TIP # FN 171
LENGTH (miles r km) 0.2/0.32
ROW: LOCL
DESCRPT: CR 1324/BETHANY ROAD @COOPER SANDY CREEK 3.0 MI N OF ALPHAR
CST: 2002
FED Share:
GA Share:
$40,000
$802,000 $641,600 $160,400
PROJECT: 753235- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # FN 156
LENGTH (miles / km) 0.2 10.32
DESCRPT: PEACHTREE DUNWOODY RD/CR 143) @ JOHNSON FERRY ROAD
PE: 2000 ROW: 2001 CST:
UNDERWAY $58,000
AFTER 2003
PROJECT: 753240- TYPE WORK: BICYCLE/PED. FACILI.TY
ATLANTA TMA TIP # FN 161
LENGTH (miles / km)
DESCRPT: ROSWELL RD FM ABERNATHY RD TO HAM]vIOND DR
FUND: STP 1.44/2.32
PE:LOCL ROW: 2001 CST: 2001 FED Share:
PROJECT: 753245- TYPE WORK: SIDEWALKS
FUND: STP
ATLANTA TMA TIP # FN AR BP091
LENGTH (miles 1 km) 0.96/1.55
DESCRPT: WINDSOR PKWY/CR 361 FM ROSWELL RD TO GA 400
OTH Share:
PE:LOCL ROW: 2001 CST:
$796,000 $2,755,000 $2,204,000
$551,000
$60,000 AFTER 2003
PROJECT: 753250- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # FN AR BP089
LENGTH (miles / km) 2.5/4.03
DESCRPT: MT VERON HWY/CR 1318 FM HEARD'S FERRY RD TO ROSWELL RD
PE: 2000 ROW: 2001 CST: 2001 FED Share:
PROJECT: 753255- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # FS 130
LENGTH (miles / km) 2.02/3.25
DESCRPT: FAIRBURN RD FM GARRISON DR TO CSX RR & SIDEWALKS; BIKE
OTH Share:
. PE:LOCL ROW: 2001 CST: 2001 FED Share:
OTH Share:
PROJECT: 753260- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # FN 157
LENGTH (miles / km) 0.3 10.48
DESCRPT: NORTHSIDE DR @RIVERVIEW RD/CR291 & OLD POWERS FERRY RD/CR293
PE:LOCL ROW: 2001 CST: 2001 FED Share:
OTH Share:
PROJECT: 753275- TYPE WORK: SIDEWALKS
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # FS AR BP063
LENGTH (miles / km) 3.05/4.91
ROW: LOCL
DESCRPT: CASCADE RD/CR 4176 FM DANFORTH RD TO FULTON INDUSTRIAL BLVD
CST: 2001
FED Share:
OTH Share:
UNDERWAY $125,000 $350,000 $280,000
$70,000
$220,000 $1,800,000 $1,440,000
$360,000
$75,000 $343,000 $274,000
$69,000
$625,000 $500,000
$125,000
Page 166 0/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00 ,--_._--_._--_._.._--
FULTON COUNTY
PROJECT: 753280- TYPE WORK: SIDEWALKS
FUND: CMAQ
ATLANTA TMA TIP # FS AR BP062
LENGTH (miles f km) 0.42/0.68
DESCRPT: NEW HOPE RD/CR 473 FM DANFORTH RD TO CASCADE RD
PE:LOCL ROW: LOCL CST: 2001
FED Share:
$250,000 $200,000
OTH Share:
PROJECT: 753285- TYPE WORK: SIDEWALKS
FUND:CMAQ
PE: LOCL
ATLANT A TMA TIP # FS AR BP070
LENGTH (miles / km) 0.7/1.13
ROW: LOCL
DESCRPT: WASHINGTON RD/CR 1389 FM ROOSEVELT HWY TO E POINT CITY LIM
CST: 2001
FED Share:
$50,000
$200,000 $160,000
OTH Share:
PROJECT: 753300- TYPE WORK: SIDEWALKS
FUND: CMAQ
PE:LOCL
ATLANTA TMA TIP # FN AR BP083
LENGTH (miles / km) 0.86/1.38
ROW: LOCL
DESCRPT: HAMMOND DR FM GLENRIDGE DR TO DEKALB COUNTY
CST: 2001
FED Share:
$40,000
$625,000 $500,000
OTH Share:
PROJECT: 753305- TYPE WORK: SIDEWALKS
FUND:CMAQ
PE:LOCL
ATLANTA TMA TIP # FN AR BP081
LENGTH (miles / km) 1.18 / 1.90
ROW: LOCL
DESCRPT: DUNWOODY PLACE FM ROSWELL RD TO NORTHRIDGE RD .
CST: 2001
FED Share:
$125,000
$350,000 $280,000
OTH Share:
PROJECT: 753310- TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # FS AR BP067B
LENGTH (miles/km) 1.5412.48
ROW: LOCL
DESCRPT: ROOSEVELT HWY/SR 14 FM WELCOME ALL RD TO BUFFINGTON RD: PH 2
. CST: 2001
FED Share:
$70,000
$625,000 $500,000
OTH Share:
PROJECT: 753315- TYPE WORK: SIDEWALKS
FUND:CMAQ
PE:LOCL
ATLANTA TMA TIP # FN AR BP075
LENGTH (miles / km) 0.44 / 0.71
ROW: LOCL
DESCRPT: NORTHRIDGE RD SIDEWALKS FM ROSWELL RD TO SR 400
CST: 2001
FED Share:
$125,000
$250,000 $200,000
PROJECT: 753320- TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # FN 158
LENGTH (miles / km)
DESCRPT: CRABAPPLE.RD/CR 1441 @RUCKERRD/CR 1331
FUND: STP 0/0.00
OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$50,000
$360,000 $288,000
PROJECT: 753325- TYPE WORK: !3ICYCLEIPED. FACILITY
FUND: STP
ATLANTA TMA TIP # FN AR BP095
LENGTH (miles / km) 0.3 /0.48
DESCRPT: MANSELL RD FM WESTSIDE PKWY TO OLD ROSWELL RD
OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
$72,000
$550,000 $440,000
$'110,000
Page 167 of336
STATE TRANSpORTATION IMPROVEMENT PROGRAM
9/21/00
FULTON COUNTY
PROJECT: 75Y030- TYPE WORK: REPLACE BRIDGE
FUND: STP
ATLANTA TMA TIP # AT 068B
LENGTH (miles / km) 0.5 /0.81
DESCRPT: INTERNATIONAL BLVD @ CSX &. NS RR @OMNI FOR STP $/ 752030
ASSOCIATED PROJECTS: 752030-
PE: 1992 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$4,947,000 $3,957,600
$989,400
PROJECT: 75Y660- TYPE WORK: WIDENING
FUND: STP
ATLANTA TMA TIP # FN 028B
LENGTH (miles / km) 3.9/6.28
DESCRPT: OLD ALABAMA RD FM JONES BRDG RD TO SR 141 - FOR ADDL'RW
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 752660-
PE: 1996 ROW: 2003 CST: NONE
UNDERWAY $11,300,000
PROJECT: 762330- TYPE WORK: WIDENING
FUND: STP
ATLANTA TMA TIP # AT 049
LENGTH (miles / km) 1.36 /2. I9
DESCRPT: LENOX ROAD FROM CANTERBURY RD TO FERNCLIFF RD IN ATLANTA
EXIST. LANES: 02 PROPOSED LANES: 04
PE: LOCL ROW: 2001 CST:
$2,900,000 AFTER 2003
PROJECT: 762380- TYPE WORK: INTERCHANGE
ATLANTA TMA TIP # AT AR 212
LENGTH (miles / km)
DESCRPT: SR 400/1-85 CONNECTOR RAMPS
EXIST. LANES: 00 PROPOSED LANES: 02
FUND:NHS 0/0.00
PE: 2001 ROW: NONE CST:
$2,500,000 AFTER 2003
PROJECT: 762465- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # M AR 246B
LENGTH (miles / km) 0/0.00
DESCRPT: PHASE II BUCKHEAD STATION N CONCOURSE (PEDESTRIAN BRIDGE)
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 762472- TYPE WORK: VEHICLE PURCHASES
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # M AR 237B
LENGTH (miles / km) 0/0.00 .
ROW: LOCL
DESCRPT: MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
CST: 2001
FED Share:
ASSOCIATED PROJECTS: 76247X-
OTH Share:
PROJECT: 762516- TYPE WORK: BICYCLE/PED. FACILITY
ATLANT A TMA TIP # AT AR BPO14
LENGTH (miles / km)
DESCRPT: MULTIUSE TRAIL FM FREEDOM PK TO CENTENNIAL PK
FUND: CMAQ 0/0.00
PE: 1995 ROW: LOCL CST: 2001 FED Share:
PROJECT: 762518- TYPE WORK: SIDEWALKS
FUND: STP
ATLANTA TMA TIP # AT AR BPI38
LENGTH (miles/km) 0/0.00
DESCRPT: LINDBERGH DR FM PEACHTREE RD TO CHESHIRE BRIDGE ROAD
OTH Share:
PE: 1995 ROW: LOCL CST: 2001 FED Share:
OTH Share:
$6:925,000 $5,540,000 $1,385,000
$1,000,000 $800,000 $200,000
UNDERWAY $750,000 $600,000 $150,000
UNDERWAY $1,233,000
$986,000 $247,000
Page J68 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00
FULTON COUNTY
PROJECT: 762520- . TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE: 1995
ATLANTA TMA TIP # FS AR BP029A
LENGTH (miles / km) 0/0.00
ROW: LOCL
DESCRPT: PARKWAY TRAIL PH I--VIRGINIA AVE TO MARTA RAIL STATION
CST: 2001
FED Share:
OTH Share:
PROJECT: 762522- TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE: 1995
ATLANTA TMA TIP # FS AR BP029D
LENGTH (miles / km) 0 /0.00
ROW: LOCL
DESCRPT: PKWY TRAIL PH IV/CAMP TRUITT RD TO BRANNON PK TO TUBMAN ELEM
CST: 2001
FED Share:
OTHShare:
PROJECT: 762525- TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE: 1995
ATLANTA TMA TIP # FS AR BP032
LENGTH (miles/km) 0/0.00
ROW: LOCL
DESCRPT: PHOENIX TRAIL FM COMMERCE GATEWA Y TO PHOENIX GATEWAY
CST: 2001
FED Share:
PROJECT: 762527-. TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # FS AR BP034
LENGTH (miles / km)
DESCRPT: DANFORTH RD FM CASCADE RD TO NEW HOPE RD
OTHShare:
FUND: CMAQ
PE: 1995
0/0.00
ROW: LOCL
CST: 2001
FED Share:
PROJECT: 762529- TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # FS AR BP035
LENGTH (miles / km)
DESCRPT: FLAT SHOALS RD FM 1-85 TO OAKLEY RD
OTH Share:
FUND:CMAQ
PE: 1995
0/0.00
ROW: LOCL
CST: 2001
FED Share:
OTHShare:
PROJECT: 762530- TYPE WORK: SIDEWALKS
ATLANTA TMA ;f1P # AT 159
LENGTH (miles / km)
,DESCRPT: METROPOLITAN AVE FM NORTHSIDE DR TO CITY LIMITS
FUND: CMAQ
PE: 1995
0/0.00
ROW: LOCL
CST: 2001
FED Share:
ottt suoe.
PROJECT: 762548- TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # AT AR BP023
LENGTH (miles / km)
DESCRPT: BOLTON RD FM MARIETTA BLVD TO JACKSONPKWY
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 762550- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # AT AR BP024
LENGTH (miles / km) 0/0.00
DESCRPT: BOLTON RD FM JACKSON PKWY TO DL HOWELL PARK WAY
OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
UNDERWAY $343,000 $274,000 $69,000
UNDERWAY $265,000 $212,000 $53,000
UNDERWAY $1,197,000 $958,000 $239,000
UNDERWAY $357,000 $286,000 $71,000
UNDERWAY $357,000 $286,000 $71,000
UNDERWAY $929,000 $743,000 $186,000
$392,000 $314,000
$78,000
$,397,000 $318,000
$79,000
PageJ690j336
"_..4.. ~
=<--.... _ ~. _
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
" " " " " " " . - . c : _ _;
,
:X_,;""""': ..._ _- . . . ~ _ _ . _ ~_ _._...
FULTON COUNTY
PROJECT: 762554- TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # AT AR BPI 2 I
LENGTH (miles I km)
DESCRPT: HOWELL MILL RD FM NORTHSIDE PKWY TO COLLIER RD
FUND:STP 010.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 762556- TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE: LOCL
ATLANTATMATIP#ATARBPI35
LENGTHfmileslkm) 010.00
ROW: LOCL
DESCRPT: WEST PACES FERRY RD FM PEACHTREE RD TO CITY LIMITS
CST: 2001
FED Share:
PROJECT: 762562- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # AT AR BP098
LENGTH (miles I km) 010.00
DESCRPT: WEST END RAIL MULTI-USE TRAIL FM SIMPSON RD TO PRYOR ROAD
OTH Share:
PE: 1999 ROW: LOCL CST: 2002 FED Share:
PROJECT: 762563- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # AT AR BP282
LENGTH (miles I km) 5.39 18.68
DESCRPT: FAIRBURN RD/CR 1349 FM MLK JR DR TO STONE RD BIKE LANES
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 762565- TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # FS AR BP079
LENGTH (miles I km)
DE~CRPT: DOWNTOWN UNION CITY AT VARIOUS LOCATIONS
OTH Share:
FUND:CMAQ
PE: LOCL
010.00
ROW:LOCL
CST: 2001
FED Share:
OTH Share:
PROJECT: 762590- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # AR 157
LENGTH (mileslkm) 0.6/0.97
DESCRPT: SR 54IUNIVERSITY AVE/MCDONOUGH AT CAPITOL/RIDGE/GAMMON AVE
LUMP SUM PROJECT
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
$682,000 $546,000 $136,000
$200,000 $160,000 $40,000 UNDERWAY $1,095,000 $876,000 $219,000
$1,400,000 $1,120,000
$280,000
$525,000 $420,000 $105,000 UNDERWAY $399,000 $359,100 $39,900
PROJECT: 762600- TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # AT AR BP280A
LENGTH (miles I km)
DESCRPT: CITY OF ATLANTA SIDEWALKS @ 12 SCHOOLS/ PH I
PROJECT: 762601- TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # AT AR BP280B
LENGTH (miles I km)
DESCRPT: CITY OF ATLANTA SIDEWALKS @ 12 SCHOOLS/ PH 2
FUND:STP 010.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
FUND:STP 010.00
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
$1,190,000 $952,000 $238,000 .
$1,197,000 $958,000' $239,000
Page 170 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FULTON COUNTY
. PROJECT: 762602- TYPE WORK: SIDEW ALKS
FUND: STP
ATLANTA TMA TIP # AT AR BP278
LENGTH (miles 1 km) 0.671 1.08
DESCRPT: DECATUR ST FM MLK MARTA STAT TO MLK VISTORS CTRJSTREETSCAPES
PE:LOCL ROW: LOCL CST: 2002 FED Share:
$836,000 $669,000
PROJECT: 762603-. TYPE WORK: SIDEWALKS
FUND: STP
ATLANTA TMA TIP # AT AR BP283
LENGTH (miles 1 km) 0.62 1 1.00
DESCRPT: PIEDMONTRD FM MARTA OVERPASS TO PHARR RD STREETSCAPES
OTH Share:
PE: LOCL ROW: LOCL
est. 2001
FED Share:
$167,000
$350,000 $280,000
PROJECT: 762604- TYPE WORK: SIDEWALKS
FUND: STP
ATLANTA TMA TIP # AT AR BP277
. LENGTH (miles 1 km) 1.53 12.46
'DESCRPT: BOULEV ARD/CS 520 STREETSCAPE FROM 1-20TO MLK JR
OTHShare:
PE:LOCL ROW: LOCL CST: 2002 FEDShllre:
$70,000
$2,295,000 $1,836,000
PROJECT: 762605- TYPE WORK: SIDEWALKS
FUND: STP
ATLANTA TMA TIP # AT AR BP284
LENGTH (miles 1 km) 0.24 10.39
DESCRPT: GRANT ST FM MLK MARTA STATION/DECATUR ST TO MEMORIAL DR
OTHShare:
PE: LOCL . ROW: LOCL CST: 2001 FED Share:
$459,000
$380,000 $304,000
PROJECT: 762606- TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # FN AR BP082
LENGTH (miles 1 km)
DESCRPT: ROSWELL RD/SR 9 FM 1-285 TO ATLANTA CITY LIMIT
FUND: STP 2.25 13.62
OTHShare:
PE: 2000 ROW: 2001 CST: 2001 FED Share:
$76,000
UNDERWAY $50,000
$900,000 $720,000
PROJECT: 762607- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP# AT ARBP287
LENGTH (mileslkm) 0.61/0.98
DESCRPT: CHEROKEE AVE/CS 2227 FM MEMORIAL DR !O AUGUSTA AVE (ZOO)
OTHShare:
PE:LOCL ROW: LOCL . CST: 2001 FED Share:
$180,000
$405,000 $324,000
PROJECT: 762608-. TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # AT AR BP288
LENGTH (miles 1 km) 1.6I 12.59
DESCRPT: 10TH FM JUNIPER TO MONROE & PIEDMONT FM 10TH TO WESTMINSTER
OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$81,000
$1,800,000 $1,440,000
OTH Share:
PROJECT: 762610- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # AT AR BP286
LENGTH (miles I km) 010.00
DESCRPT: RANDOLPH AVE/LAKE AVE FM EDGEWOOD AVE TO LITTLE FIVE POINTS
PE:LOCL ROW: LOCL CST: 2002
reo sss-
$360,000
$956,000 $765,000
OTHShare:
$191,000
Page 171 0/336
- - - --- ._- -_.. _---------------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
__--_ _"'-------_. . ... .. . ~_ ..,~-,..~.--_ .........""""-,
........
9/21/00
.."'
--.....-"".... ..""__
...
"'~_
""_"'_...w_~~"'
__
~~_"""
FULTON COUNTY
PROJECT: 762613- TYPE WORK: SIDEWALKS
FUND: CMAQ
. PE:LOCL
ATLANTA TMA TIP # AT AR BP29IB
LENGTH (miles/km) 0/0.00
ROW: LOCL
DESCRPT: SE ATLANTA ALONG MANIGAULT; FUNSTON ST; LAKEWOOD AVE
CST: 2001
FED Share:
$443,000 $354,000
OTHShare:
PROJECT: 762614- TYPE WORK: SIDEWALKS
FUND:CMAQ
PE: LOCL
ATLANTA TMA TIP # AT AR BP29 IA
LENGTH (miles / km) 0/0.00
ROW: LOCL
DESCRPT: SW ATLANTA ALONG OGLETHORPE AVE; ROSE CIR; MCMURRA Y DR
CST: 2001
FED Share:
$89,000
$418,000 $334,000
OTH Share:
PROJECT: 762615- TYPE WORK: SIDEWALKS
FUND:CMAQ
PE: LOCL
ATLANTA TMA TIP # FN AR BP085
LENGTH (miles / km) 0.51 /0.82
ROW: LOCL
DESCRPT: TROWBRIDGE RD FM DALRYMPLE RD TO ROSWELL RD
CST: 2001
FED Share:
$84,000
$250,000 $200,000
PROJECT: 762616- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # FN AR BP084
LENGTH (miles / km) I.3 7 12.2 I
DESCRPT: WILLEO RD/RIVERSIDE DR FM COBB COUNTY TO AZALEA DR
OTH Share:
PE: LOCL ROW: LOCL CST: 2002 FED Share:
$50,000
$350,000 $280,000
OTHShare:
PROJECT: 762620- TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE:NONE
ATLANTA TMA TIP # AR BP003B
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: ATLANTA REGION BICYCLE & MULTI-USE TRAIL PLANNING - PH 2
. CST: 2001
FED Share:
$70,000
$140,000 $112,000
OTH Share:
PROJECT: 762624- TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE:LOCL
ATLANTA TMA TIP # AT AR BP293
LENGTH (miles / km) 1.5 /2.42
ROW: LOCL
DESCRPT: PEACHTREE HILLS FM PEACHTREE TO LINDBERGH & SIDEWALKS
CST: 2001
FED Share:
$28,000
$1,075,000 $860,000
PROJECT: 762630- TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # AT 185
LENGTH (miles / km)
DESCRPT: CHESHIRE BRIDGE/SR 13 @ LINDBERGH DRiSR 236
FUND:STP 0/0.00
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Shure:
$215,000
$1,000,000 $800,000
PROJECT: 762632- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # AT 184
LENGTH (miles rkm) 0/0.00
DESCRPT: PIEDMONT RD/SR 237 @ SIDNEY MARCUS & LINDBERGH DR
OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$200,000
$2,500,000 $2,000,000
OTH Share:
$500,000
Page 172 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FULTON COUNTY
PROJECT: 770302- TYPE WORK: RAIL PROJECTS
ATLANT A TMA TIP # AR 344B .
LENGTH (miles / km)
DESCRPT: COMMUTER RAIL PROGRAM MANAGEMENT - PHASE 2 PROPOSED TCM
FUND: OTHER 0/0.00
PE: 2001 ROW: NONE CST: NONE
$1,550,000
PROJECT: 770303- TYPE WORK: RAIL PROJECTS
ATLANTA TMA TIP # AR 344C
LENGTH (miles / km)>
DESCRPT: COMMUTER RAIL PROGRAM MANAGEMENT - PHASE 3
PROPOSED TCM
.
FUND: OTHER 0/0.00
PE: 2002 ROW: NONE CST: NONE
$2,700,000
PROJECT: 770310- TYPE WORK: RAIL PROJECTS
FUND:HPP
ATLANTA TMA TIP # AR 120A
LENGTH (miles / km) 0.5 /0.81
DESCRPT: ATLANTA MULTI-MODAL PASSENGER TERMINAL PHASE I; CT I PROPOSED TCM
ASSOCIATED PROJECTS: 77Y310-
PE: 1993 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$19,525,000 $15,620,000
$3,905,000
PROJECT: 770311- TYPE WORK: RAIL PROJECTS
FUND: NHS
ATLANTA TMA TIP# AR 120B
LENGTH (miles/km) 0/0.00
DESCRPT: ATLANTA MULTI-MODAL PASSENGER TERMINAL PHASE I; CT 2
PROPOSED TCM
PE: 1993 ROW: NONE CST: 2002 FED Share: GA Share:
UNDERWAY
$10,000,000 $8,000,000 $2,000,000
PROJECT: 770315 TYPE WORK: RAIL PROJECTS
FUND:NHS
ATLANTA TMA TIP # AR 269A
LENGTH (miles / km) 0/0.00
DESCRPT: COMMUTER RAIL ATLANTA TO DACULA (ATHENS) PHASE I PROPOSED TCM
PE: 200\ ROW: 2001 CST: 2001 FED Share: GA Share:
$9,999,000 $1,000,000 $14,000,000 $11,200,000 $2,800,000
PROJECT: 770316- TYPE WORK: RAIL PROJECTS
FUND:NHS
ATLANTATMA TIP#.AR269B
LENGTH (miles/km) 0/0.00
DESCRPT: COMMUTER RAIL ATLANTA TO DACULA (ATHENS) PHASE 2 PROPOSED TCM
PE:NONE ROW: 2002 CST: 2002 FED Share: GA Share:
$5,000,000 . $40,000,000
$32,000,000 $8,000,000
PROJECT: 770320- TYPE WORK: RAIL PROJECTS
FUND: HPP
ATLANTA TMA TIP # AR 268A
LENGTH (miles / km) 0/0.00
DESCRPT: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON) PHASE I
PROPOSED TCM
PE: 2001 ROW: 2001 CST: 2001 FED Share: GA Share:
$6,000,000 $5,000,000 $6,000,000 $4,800,000 $1,200,000
PROJECT: 770321 TYPE WORK: RAILPROJECTS
. FUND:NHS
ATLANTA TMA TIP # AR 268B
LENGTH (miles / km) 0 10.00
DESCRPT: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON) PHASE 2 & 77Y321 PROPOSED TCM
ASSOCIATED PROJECTS: 77Y321-
PE:NONE ROW: 2002 CST: 2002 FED Share: GA Share:
$5,000,000 $14,000,000 $11,200,000
$2,800,000
Page 173 of336
__ ._--- . .- --_.-._._---_. ------------------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FULTON COUNTY
PROJECT: 770873- TYPE WORK: ATMS/ITS
FUND: CMAQ
ATLANTA TMA TIP # AR 20 I B
LENGTH (miles / km)
0/0.00
DESCRPT: ATMSI ARTERIAL ROUTES IN ATL-INSTALL COMM CABLE & HDW/DEKALB
PE:NONE ROW: NONE CST: 2001
FED Share:
GA Share:
$1,000,000 $800,000 $200,000
PROJECT: 770900- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
ATLANTA TMA TIP # FN 095
LENGTH (miles r km) 0.37/0.60
ROW: LOCL
DESCRPT: CS 3101/GRIMES BRiDGE ROAD@BIG CREEK IN SOUTH ROSWELL
CST: 2001
FED Share:
GA Shure:
UNDERWAY
$2,214,000 $1,771,200
$442,800
PROJECT: 770923- TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # FN AR 177C
LENGTH (miles / km)
DESCRPT: OLD ALABAMA FM RIVERSIDE DR TO MARKET BLVD
FUND:CMAQ
PE: 1995
1.2 / 1.93
ROW: NONE
CST: 2001
FEDShllre:
OTHShare:
PROJECT: 771090- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1998
ATLANTA TMA TIP # FN 115
LENGTH (miles / km} 0.2/0.32
ROW: LOCL
DESCRPT: CR 34/FREEMANVILLE ROAD@CHICKEN CREEK 2.5 MI N ALPHARETTA
CST: 2001
FED Share:
GA Share:
UNDERWAY
$332,000 $266,000
$66,000
UNDERWAY
$550,000 $440,000 $110,000
PROJECT: 771102- TYPE WORK: ATMS/ITS
FUND: CMAQ
PE:NONE
ATLANTA TMA TIP # FN/S AR 193C
LENGTH (miles / km)
0/0.00
ROW: NONE
DESCRPT: ATMS: REPLACEMENT AND MAINTENANCE OF EDP EQUIPMENT
CST: 2003
FED Share:
GA Share:
$1,000,000 $800,000 $200,000
PROJECT: 771103- TYPE WORK: ATt\1S/ITS
FUND: CMAQ
ATLANTA TMA TIP # AR 286
LENGTH (miles / km) 0/0.00
DESCRPT: ATMS: REPLACEMENT AND MAINTENANCE OF EDP EQUIPMENT - 2001
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$1,000,000 $800,000 $200,000
PROJECT: 771 I 15- TYPE WORK: SIGNALS
FUND: CMAQ
ATLANTA TMA TIP # M AR 164C
LENGTH (miles/km) 0/0.00
DESCRPT: MARTA OPERATION ENHANCEMENT-SIGNAL PRIORITY SYSTEM (I CORRI)
PE.NONE ROW:NONE
CST: 2003 FED Share:
OTHShare:
PROJECT: 771130- TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE: LOCL
ATLANTA TMA TIP # FS AR I77C
LENGTH (miles / km)
0 /0.00
ROW: LOCL
DESCRPT: SIDEWALKS AND BIKE LANES ON US 29/MAIN STREET/COLLEGE PARK
CST: 2002
FEDShllre:
OTH Shure:
$200,000 $160,000 $40,000
$375,000 $300,000
$75,000
Page J 74 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FULTON COUNTY
PROJECT: 771131- TYPE WORK: BICYCLE/PED. FACILITY
ATLANTA TMA TIP # AT AR 177F
LENGTH (miles / km)
DESCRPT: BICYCLE PARKING RACKS
FUND:CMAQ
PE: LOCL
0/0.00
ROW: LOCL
CST: 2001
FED Share:
OTH Share:
PROJECT: 771141- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
. ATLANTA TMA TIP # AR 221 C
LENGTH (miles / km) 0 /0.00
DESCRPT: START-UP FUNDS FOR TRANSPORTATION MANAGEMENT ASSN-TMA PH-3
PE: 2001 ROW: NONE CST: NONE
$63,000 . $50,000
$13,000 $1,500,000
PROJECT: 771145- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 297B
LENGTH (miles / km) 0/0.00
DESCRPT: CLEAN AIR CAMPAIGN (AIR QUALITY INFORMATION PROGRAM) YEAR 4
PE: 2001 ROW: NONE CST: NONE
$2,500,000
PROJECT: 771146- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 297C
LENGTH (miles / km) 0/0.00
DESCRPT: CLEAN AIR CAMPAIGN (AIR QUALITY INFORMATION PROGRAM) YEAR 5
PE: 2002 ROW: NONE CST: NONE
$2,500,000
PROJECT: 771148- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP
ATLANTA TMA TIP # AR 287B
LENGTH (miles / km) 0/0.00
DESCRPT: CLEAN AIR SPECIAL IN ITATIVE - YEAR 2
.PE: 2001 , ROW:NONE
CST: NONE
$2,000,000
PROJECT: 771149- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP
ATLANTA TMA TIP # AR 287C
LENGTH (miles / km) 0/0.00
DESCRPT: CLEAN AIR SPECIAL IN ITATIVE - YEAR 3
PE: 2002 ROW: NONE CST: NONE
$2,000,000
PROJECT: 771200- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
ATLANTA TMA TIP # FN 166
LENGTH (miles / km) 0.2 /0.32
ROW: LOCL
DESCRPT: CR I88/UPPER HEMBREE ROAD@ FOE KILLER CREEK 2 MI SW OF ALPH
CST: 2002
FED Share:
GA Share:
UNDERWAY
$749,000 $599,200 $149,800
PROJECT: 771228- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # FN AR BPO14
LENGTH (miles / km) 0/0.00
DESCRPT: MANSELL ROAD/CR 126 FROM BIG CREEK TO MARTA PARKING LOT
PE:LOCL ROW: LOCL CST: 2001, FED Share: ,
OTH Share:
$981,000 $785,000
$196,000
Page 175 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
--_._._------_._- __ _-_. .. ._-_. . -__----,-_.--~_.
9/21/00
--'-_._--~~--,,_.,----
__._.",--
FULTON COUNTY
PROJECT: 771240- TYPE WORK: SIDEWALKS
FUND: STP
ATLANTA TMA TIP # FN AR BPOl5
LENGTH (miles 1 km) 010,00
DESCRPT: AZALEA DRIVE/FROM WILLEO ROAD TO SR 9/ROSWELL ROAD
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$812,000 $650,000
PROJECT: 771250- TYPE WORK: BICYCLE/PED, FACILITY
FUND: STP
ATLANTA TMA TIP # FS AR BP028
LENGTH (miles / km) 010.00
DESCRPT: ON-STREET BICYCLE & PEDESTRIAN WALKS & TRAILS/COLLEGE PARK
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$162,000
$504,000 $403,000
PROJECT: 771254- TYPE WORK: LANDSCAPING
ATLANtA TMA TIP # AT AR BP270
LENGTH (miles 1 km)
DESCRPT: METROPOLITAN PARK WAY STREETS CAPE
FUND: STP
o10,00
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$101,000
$625,000 $500,000
OTH Share:
PROJECT: 771270- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
ATLANTA TMA TIP# FN 165
LENGTH (mileslkm) 0.2 10.32
ROW: LOCL
DESCRPT: CR 85/KIMBALL BRIDGE RD. @ BIG CREEK 2 MI SE OF ALPHARETTA
CST: 2002
FED Share:
GA Share:
$125,000
UNDERWAY
$433,000 $346,400 $86,600
PROJECT: 771271- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # FS 139
LENGTH (miles 1 km) 0.2/0.32
ROW: LOCL
DESCRPT: CR 1390/RICO ROAD @MOSS CREEK 6 MI NW OF PALMETTO
CST: 2003
FED Share:
GA Share:
UNDERWAY
$134,000 $107,200
$26,800
PROJECT: 771272- TYPE WORK: , REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
ATLANTA TMA TIP # FS 141
LENGTH (miles 1 km) 0.21/0.34
ROW: LOCL
DESCRPT: CR 485IENON ROAD @ CAMP CREEK 12 MI W OF ATLANTA
CST: 2002
FED Share:
GA Share:
UNDERWAY
$387,000 $309,600
$77,400
PROJECT: 771273- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
ATLANTA TMA TIP # FS 144
LENGTH (miles 1 km) 0.2/0.32
ROW: LOCL
DESCRPT: CR 629/JOHNSON ROAD @PEEKS CREEK I MI E OF PALMETTO
CST: 2002
FED Share:
GA Share:
UNDERWAY
$177,000 $141,600
$35,400
PROJECT: 771274- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
ATLANTA TMA TIP # FN 168
LENGTH (miles 1 km) 0.21/0.34
ROW: LOCL
DESCRPT: CR 27/PROVIDENCE ROAD @ COOPER SANDY CREEK 5 MI NW OFALPHAR
CST: 2002
FED Share:
GA Share:
UNDERWAY
$598,000 $478,400 $119,600
Page J 76 of336
-----,-------_._-------- ,----
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00
FULTON COUNTY
PROJECT: 771Q75- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
ATLANTA TMA TIP # FS 140
LENGTH (miles / km) 0.19/0.31
DESCRPT: CR I 392/COCHRAN MILL ROAD@PEACREEK 7 MI NW OF PALMETTO
PE:2000 ROW: LOCL CST: 2002
FED Share:
GA Share:
UNDERWAY
$129,000 $103,200
$25,800
PROJECT: 771276- TYPE WORK: REPLACE BRIDGE
FUND: STP
ATLANTA TMA TIP # FS 143
LENGTH (miles / km) 0.19/0.31
DESCRPT: CR 1392/COCHRAN MILL ROAD@UTILE PEA CREEK NW OF PALMETTO
PE: 2000 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$129,000 $103,200
$25,800
PROJECT: 771282- TYPE WORK: PRELIMINARY ENGINEERING
ATLANTA TMA TIP # AR 270
LENGTH (miles / km)
DESCRPT: REGIONAL TRANSIT FARE STUDY
FUND:CMAQ 0/0.00
PE:2003 ROW: NONE CST: NONE
$25,000
PROJECT: 771291- TYPE WORK: A T M S / I T S " , FUND:NHS
ATLANT A TMA TIP # AR 308B
LENGTH (miles / km) 0/0.00
DESCRPT: ATMS: MAINTENANCE OF METRO ATLANTA ATMS EQUIPMENT - 2001
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$2,000,000 $1,600,000
$400,000
PROJECT: 771301- TYPE WORK: ATMSIITS
FUND:NHS
ATLANT A TMA TIP # AR 31DB
LENGTH (miles / km) 0/0.00
DESCRPT: ATMS: ITS OPERATIONS AND SUPPORT IN THE ATL REGION - 2001
PE:NONE ROW: NONE CST:200! FED Share: GA Share:
r
$6,250,000 $5,000,000 $1,250,000
PROJECT: 771306- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND:NHS
ATLANTATMATIP#AR313B
LENGTH (miles/km) 0/0.00
DESCRPT: HERO OPERATIONS AND SUPPORT IN THE ATLANTA REGlON-2001
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$2,800,000 $2,240,000
$560,000
PROJECT: 771331- TYPE WORK: RIDE SHARING
FUND: CMAQ
ATLANTA TMA TIP # AR 288
LENGTH (miles! km) ,0/0.00
DESCRPT: REGIONAL TRANSPORTATION COORDINATOR:ONSITE EMPLOYER-BASE TOM
PE: 2001 ROW: NONE CST: NONE
$450,000
PROJECT: 771333- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP
ATLANTA TMA TIP # AR 300A
LENGTH (miles / km) 0/0.00
DESCRPT: PARTNERSHIP FOR SMOG FREE GA (PSG) PH 4
PE: 2001 \ ROW: NONE CST: NONE
$3,000,000
Page J 77 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
_ _ _ _ _ _ _ _ _ ""....._. . _ _....._,_,..- . . . -......
.... .h'...
..._ _.._.._"""""........._ _....
_ . . . - ~ ~,~.' _~
-,,--..0;,..__ l
_ ...... _,~""
FULTON COUNTY
PROJECT: 771334- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP
ATLANTA TMA TIP # AR 300B
LENGTH (miles I km) 0 10.00
DESCRPT: PARTNERSHIP FOR SMOG FREE GA (PSG) PH 5
PE: 2002 ROW: NONE CST: NONE
$4,000,000
PROJECT: 771335- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 291A
LENGTH (miles I km) 0/0.00
DESCRPT: STATE EMPLOYEE COMMUTER ASST & TRANSIT INCENTIVE PROM: PH 2
PE: 2001 ROW: NONE CST: NONE
$500,000
PROJECT: 771336- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 291B
LENGTH (miles I km) 0 10.00
DESCRPT: STATE EMPLOYEE COMMUTER ASST & TRANSIT INCENTIVE PROM: PH 3
PE: 2002 ROW: NONE CST: NONE
$500,000
PROJECT: 771337- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 285A
LENGTH (miles I km) 0 10.00
DESCRPT: ALT FUEL VEHICLE INCREMENTAL COST INCENTIVE PROM/ YR I
PE: 2001 ROW: NONE CST: NONE
$500,000
PROJECT: 771338- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 283
LENGTH (mileslkm) 0/0.00
DESCRPT: ALT FUEL TAROETED FLEET VEHICLE TURNOVER PROM & TAXIS;SHUTTL
PE:NONE ROW: NONE CST: 2001 FED Share:
OTHShare:
PROJECT: 771339- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 289
LENGTH (miles I km) 0 10.00
DESCRPT: CLEAN/ALT FUEL TECHNOLOGIES EDUCATION & OUTREACH PROM
PE:2001 ROW: NONE CST: NONE
$500,000 $400,000
$100,000 $60,000
PROJECT: 771340- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATLANTA TMA TIP # AT AR BP281
LENGTH (miles Zkm) 1/1.61
DESCRPT: PRYOR RD STREETSCAPE FM CLAIRE DR TO UNIVERSITY AVE
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 771351- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
PE.NONE
ATLANTA TMA TIP # M AR 250B
LENGTH (miles I km) 0 10.00
ROW: NONE
DESCRPT: MARTA AUTOMATED TRA VELER INFO SYSTEM & OTHER ITS: PH 2
CST: 2001
FED Share:
OTH Share:
$241,000 $193,000
$48,000
$2,000,000 $1,600,000
$400,000
Page 178 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FULTON COUNTY
PROJECT: 771352- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
PE:NONE
ATLANTATMATIP#MAR250C'
LENGTH (miles/km) 0/0.00
ROW: NONE
DESCRPT: MARTA AUTOMATED TRA VELER INFO SYSTEM & OTHER ITS: PH 3
CST: 2002
FED Share:
OTHShare:
PROJECT: 771354- TYPE WORK: RIDE SHARING
FUND: CMAQ
ATLANTA TMA TIP # AR 159C I
LENGTH (miles / km) 0/0.00
DESCRPT: REGIONAL RIDESHARE PROGRAM-COMMUTE CONNECTIONS- PH I
PE: 2001 ROW: NONE C.ST:NONE
$2,000,000 $1,600,000
$400,000 $2,375,000
PROJECT: 771355- TYPE WORK: R.IDE SHARING
FUND: CMAQ
ATLANTA TMA TIP # AR 159C2
LENGTH (miles / km) 0/0.00
DESCRPT: REGIONAL RIDESHARE PROGRAM-COMMUTE CONNECTIONS- PH 2
PE: 2001 ROW: NONE CST: NONE
$2,375,000
PROJECT: 771360- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 272
LENGTH (miles / km) 0/0.00
DESCRPT: EMPLOYER ASSISTANCE TO PROMOTE TRA VEL DEMAND MANAGEMENT
PE: 2001 ROW: NONE CST: NONE
$150,000
PROJECT: 771363- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
ATLANTA TMA TIP # AR 296A
LENGTH (miles / km) 0/0.00
DESCRPT: REGIONAL VANPOOL SUBSIDY PRGM:APPROX 50 COMMUTER VANPOOLS
PE: 2001 ROW: NONE CST: NONE
$270,000
PROJECT: 771367- TYPE WORK: . MISCELLANEOUS IMPROVEMENTS FUND:CMAQ
PE:NONE
ATLANTA TMA TIP # AR 280B
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: ALT FUEL REVOLVING LOAN PRGM TO FUND FLEET;INFRASTRUCTURE;P2
CST: 2001
FED Share:
OTH Share:
PROJECT: 771368- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: CMAQ
PE:NONE
ATLANTA TMA TIP # AR 280C
LENGTH (miles / km) 0/0.00
ROW: NONE
. D~SCRPT: ALT FUEL REVOLVING LOAN PRGM TO FUJ':lD FLEET;INFRASTRUCTURE;P3
CST: 2002
FED Share:
PROJECT: 77Y321- TYPE WORK: RAIL PROJECTS
FUND: HPP
ATLANTA TMA TIP # AR 268B I
LENGTH (miles / km) 0/0.00
DESCRPT: COMMUTER RAIL ATLANTA TO GRIFFIN (MACON) PHASE 2 SEE 770321 PROPOSED TCM
ASSOCIATED PROJECTS: 770321-
OTH Shure:
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$1,067,000 $854,000
$213,000
$1,067,000 $854,000
$213,000
"
$4,000,000 $3,200,000
$800,000
Page J 79 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FULTON COUNTY
PROJECT: 707306- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 RAIL CONSTRUCTION PROGRAM (SECTION 5309)
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
OTHShare:
PROJECT: 707307- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: FY 2001 FIXED GUIDEWAY MODERNIZATION (SECTION 5309)
CST: 2001
FED Share:
PROJECT: 707308- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 BUS PROCUREMENT (40) - (SECTION 5309)
OTHShare:
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
PROJECT: 7V7045- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$45,575,000 $36,460,000
$9,115,000
$22,500,000 $18,000,000
$4,500,000
$4,000,000 $3,200,000
$800,000
$143,000 $143,000 $37,000
PROJECT: 86UIIO- TYPE WORK: PRELIMINARY ENGINEERING
FUND: HPP
ATLANTA TMA TIP # AR 267
LENGTH (miles / km) 0/0.00 .
DESCRPT: TRANS ALT STUDY FM ATLANTA TO CHATTANOOGA(ATLANTA $)860110 PROPOSED TCM
PE: 2001 ROW: NONE CST: NONE
$1,875,000
PROJECT: 870375- TYPE WORK: PRELIMINARY ENGINEERING
FUND: BRIDGE
ATLANTA TMA TIP # AR 372
LENGTH (miles/km) 0/0.00
DESCRPT: DESIGN OF 40 BRIDGES IN THE 13 COUNTY ATLANTA AREA-PE ONLY
PE:2001 'ROW: NONE
CST: NONE
$9,999,000
PROJECT: T000006 TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: MARTA FY 2003 RAIL NEW START CATEGORY (SECTION 5309)
CST: 2003
FED Share:
OTH Share:
PROJECT: T000007 TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 0 /0.00
ROW: NONE
DESCRPT: MARTAFY 2003 FIXED GUIDEWAY MODERNIZATION (SECTION 5309)
CST: 2003
FED Share:
OTH Share:
$18,750,000 $15,000,000 $3,750,000
$23,750,000 $19,000,000
$4,750,000
Page 180 of336
_------------_._---
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
FULTON COUNTY
PROJECT: T000008 TYPE WORK: . CAPITAL LENGTH (miles / km)
DESCRPT: MARTA FY 2003 BUS ALLOCATIONS (SECTION 5309)
PROJECT: T000009 TYPE WORK: CAPITAL LENGTH (mites / km)
DESCRPT: FY 2001 GRTA CNG BUS PURCHASE (SECTION 5309)
PROJECT: TOOOOIO TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 GRTA CNG BUS PURCHASE (SECTION 5309)
PROJECT: TOOOOII TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 GRTA CNG BUS PURCHASE (SECTION 5309)
PROJECT: TOOOOl6 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 FULTON COUNTY SECTION 5310
FUND: TRANSIT.
PE: NON E
0/0.00
ROW: NONE
, CST: 2003
FED Share:
$4,000,000 $3,200,000
OTHShare:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
rso sno
$800,000
$18,000,000 $16,200,000
OTH Share:
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002
FED Shure:
$1,800,000
$18,000,000 $16,200,000
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
$1,800,000
$24,000,000 $21,600,000
OTH Share:
FUND:TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
.FED Share:
GA Share:
$2,400,000
$150,000 $150,000 $37,000
PROJECT: T000026 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 FULTON COUNTY SECTION 5310
FUND: TRANSIT
PE: NON E
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Shure:
$157,000 . $157,000
$39,000
PROJECT: T000030 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 MARTA CAPITAL SECTION 5307
PROJECT: T00003 I TYPE WORK: CAPITAL LENGTH (miles I km}
DESCRPT: FY 2002 MARTA CAPITAL SECTION 5307
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
OTH Shllre:
FUND: TRANSIT
PE:. NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
OTH Share:
$44,549,000 $35,639,000 $8,910,000
$48,339,000 $38,671,000 $9,668,000
Page 181 of336
- - - - - - - - - - - - _ _... __ _ .
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
_ _ _...,._.~._..,_ _.._ ............,.__" ' _ j _.."'t_"',.......__,
.~_.... . . . - . - - _ .
..
vV':
" ..
# _ - . .........."'....."",nIt:........._ _
FULTON COUNTY
PROJECT: T000032 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 MARTA CAPITAL SECTION 5307
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FEDSllare:
$53,580,000 $42,864,000
PROJECT: T00022I TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 ATLANTA SECTION 3037
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
$10,716,000
$2,000,000 $1,000,000
PROJECT: T000222 TYPE WORK: CAPlT AL LENGTH (miles / km)
DESCRPT: FY 2002 ATLANTA SECTION 3037
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
$1,000,000
$2,000,000 $1,000,000
PROJECT: T000223 TYPE WORK: CAPITAL DESCRPT: FY 2003 ATLANTA SECTION 3037
LENGTH (miles / km)
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
. FED Share:
$1,000,000
$2,000,000 $1,000,000
OTH Share:
PROJECT: T000224 TYPE WORK: CAPITAL
FUND: TRANSIT . PE:NONE
LENGTH (miles / km) 0 /0.00
ROW: NONE
DESCRPT: MARTA FY 2002 RAIL NEW START CATEGORY (SECTION 5309) .
CST: 2002
FED Share:
$1,000,000
$33,250,000 $26,600.000
01'11 Share:
PROJECT: T000225 TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
ATLANTA TMA TIP #
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: MARTA FY 2002 FIXED GUIDEWAY MODERNIZATION (SECTION 5309)
CST: 2002
FED Share:
$6,650,000
$23,125,000 $18,500,000
OTiJ Share:
$4,625,000
Page J81 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
GiLMER COUNTY
PROJECT: 0000847 TYPE WORK: REPLACE BRIDGE
FUND: FOREST HWY PE: 2001
LENGTH (miles / km) 0.21 /0.34
ROW: NONE
DESCRPT: CR I 53/FH 34IROCK CREEK ROAD @ ROCK CREEK 9 MI NE OF ELLIJAY
CST: 2002 FED Share:
.$25,000
$238,000 $238,000
PROJECT: 62214X- TYPE WORK: TURN LANES
FUND:NHS
LENGTH (miles / km) 22. I /35.52
DESCRPT: SR515 FM 1-575 THRU GILMER TO TOTEHEROW RD/FANNINISEE PICKEN
ASSOCIATED PROJECTS: 622140-
PE:NONE ROW: NONE CST: NONE
PROJECT: 631580- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.3 /0.48
PE: 1998 ROW: 2001
DESCRPT: SR 282 BRIDGE REPLACEMENT OVER TAILS CREEK WEST OF ELLlJA Y
CST: 2002 FED Share:
GA Share:
UNDERWAY $36,000
$1,506,000 $1,204,800
$301,200
PROJECT: 631590- TYPE WORK: PASSING LANES
FUND: STP
,
LENGTH (miles / km) 3.3 /5.31
DESCRPT: SR 2/52 PASSING LNS EB MP 4.8-5.9IMP 8.25-9.35IWB 10.4-115
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 2003 ROW: CST:
$306,000 AFTER 2003 AFTER 2003
PROJECT: 642070- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 5.35 /8.61
DESCRPT: SR 382- FOUR LOCATIONS BETWEEN SR 136 AND OLD SR 5
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 2003 ROW: CST:
$461,000 AFTER 2003 AFTER 2003
Page 183 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
GLASCOCK COUNTY
PROJECT: 245345- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 102 @ JOES CREEK 2.2 MI SE OF MITCHELL
FUND: BRIDGE
PE: 200 I
0.21/0.34
ROW: 2002
CST: 2003
FED Share:
GA Share:
$20,000 $10,000 $605,000 $484,000 $121,000
PROJECT: 245347- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.22/0.35
DESCRPT: SR 171 @ ROCKY COMFORT CREEK OfF 1.8 MJ NE OF GIBSON
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page 184 0/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
~-'-'-----'----
9/21/00
GLYNN COUNTY
PROJECT: 0000075 TYPE WORK: LANDSCAPING
~RUNSWICKTIP#BATSOI-05
LENGTH (mileslkm)
DESCRPT: SPUR 25 CORRIDOR BEAUTIFICATION & PED/BIKE ROUTE
FUND: STP 010.00
PE:LOCL ROW:LOCL CST: 2001 FED Share:
PROJECT: 0000421 TYPE WORK: WIDENING
FUND: STP
BRUNSWICK TIP # BATSO1-02
LENGTH (miles I km) 2.4 13.86
DESCRPT: SR 25 SPUR FM CATE RD ALONG CANAL RD/CR 588 TO SR 99
EXIST. LANES: 02 PROPOSED LANES: 04
OTHShare:
PE:2003 ROW: LOCL CST:
!!
$500,000 $400,000
$100,000 $5,000
AFTER 2003
PROJECT: 0000422 TYPE WORK: WIDENING
BRUNSWICK TIP # BATSOO-15
LENGTH (miles I km)
DESCRPT: SR 99/GRANTS FERRY ROAD FROM SR 25/US 17 TO 1-95
EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 1.26/2.03
PE: 2001 ROW: LOCL . CST:
$5,000 AFTER 2003
PROJECT: 0001136 TYPE WORK: SIGNALS
FUND: STP
BRUNSWICK TIP #
LENGTH (miles I km) 0 10.00
DESCRPT: UPGRADE SIGNAL EQUIPMENT @ SEVERAL LOC IN GLYNN CO
LUMP SUM PROJECT
PE.NONE ROW: NONE CST: 2001 FED Share: GA Share:
$425,000 $340,000
$85,000
PROJECT: 51108X- TYPE WORK: WIDENING
FUND: NHS
BRUNSWICK TIP # BATS93-11
. LENGTH (miles I km) 0 10.00
DESCRPT: 1-95 FM CR 138 TO US 17/GLYNN & BR @ L SATlLLA RIVER--511 084
EXIST. LANES: 04 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 511084-
PE:NONE ROW: NONE CST: NONE
PROJECT: 511100- TYPE WORK: WIDENING
FUND: NHS
BRUNSWICK TIP # BATS93-10
LENGTH (mileslkm) 7.77/12.51
DESCRPT: 1-95 FM US 341 TO ALTAMAHA RIVER @ MCINTOSH COUNTY LINE
EXIST. LANES: 04 PROPOSED LANES: 06
PE: 1993 ROW: 2001 CST:
UNDERWAY $8,000
AFTER 2003
PROJECT: 511325- TYPE WORK: ATMS/ITS
FUND: 1M
BRUNSWICK TIP# BATSOI-OI
LENGTH (miles I km) 7/11.27
DESCRPT: ATMS/I-95 FOG DETECTION SYS FM SR 520/US 82 TO SR 27/US 341
PE: 1997 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$1,500,000 $1,350,000
$150,000
PROJECT: 511420- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles I km)
DESCRPT: 1-95 AT SR 520/US 17/0CEAN HIGHWAY LUMP SUM PROJECT
FUND:STP 0.63/1.01
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
~
$309,000 $278,100
$30,900
Page 1850/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
GLYNN COUNTY
PROJECT: 522042- TYPE WORK: BRIDGE REMOV AL
FUND: OTHER
BRUNSWICK TIP#BATS96-05
LENGTH (miles/km) 0/0.00
DESCRPT: SR 25IBRUNSWICK REMOVAL OF OLD SIDNEY LANIER BRIDGE
PE: 1991 ROW: NONE CST: 2001
FED Share:
GA Share:
UNDERWAY
$7,924,000 $3,962,000 $3,962,000
PROJECT: 522730- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
BRUNSWICK TIP # BATS94-08
LENGTH (miles 1 km) 0.27/0.43
DESCRPT: SR 25 @ CS 427ffALMADGE AVE & SR 25CIGLOUCESTER ST/BRUNSWICK
EXIST. LANES: 04 PROPOSED LANES: 05
PE: 1995 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$450,000 $405,000
$45,000
PROJECT: 532650- TYPE WORK: WIDENING
FUND: STP
BRUNSWICK TIP # BATSOI-03
LENGTH (miles 1 km) 3.7516.04
DESCRPT: SR 25/US 17 FROM YACHT DRIVE TO ALTAMAHA BLVD-WIDENING
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 532655-
PE: 2002 ROW: CST:
$50,000 AFTER 2003 AFTER 2003
PROJECT: 533140- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
BRUNSWICK TIP # 00-02
LENGTH (miles 1 km) 0.2510.40
DESCRPT: SR 520/JEKYLL ISLAND ROAD @ CEDAR CREEK 1.5 MI SE OF SR 25
PE: 2000 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 542240- TYPE WORK: WIDENING
FUND: STP
BRUNSWICK TIP # BATSOI-04
LENGTH (miles 1 km) 1.512.42
DESCRPT: OLD JESUP HWY/CR 586 FM SR303/COMMUNITY RD TO CATE RD/CR 589
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 2002 ROW: LOCL CST:
$100,000 AFTER 2003
PROJECT: 562120- TYPE WORK: BRIDGES
FUND: STATE
BRUNSWICK TIP # BATS96-06
LENGTH (miles 1 km) 1.45/2.33
DESCRPT: SR 520 OVER LATHAM RIVER AT ONE LOCATION ON JEKYLL CAUSEWAY
PE: 2001 ROW: 2001 CST:
. $250,000 $182,000
AFTER 2003
PROJECT: 5D8007- TYPE WORK: OPERATING
FUND: TRANSIT
PE:NONE
BRUNSWICK TIP #
LENGTH (miles 1 km) 010.00
ROW: NONE
DESCRPT: PUBLIC TRANSIT SERVICE FOR BRUNSWICK AND GLYNN COUNTY
CST: 2001
FED Share:
OTH Share:
PROJECT: 5D8008- TYPE WORK: CAPITAL
FUND: TRANSIT
PE.NONE
BRUNSWICK TIP #
LENGTH (miles 1 km) 010.00
ROW: NONE
DESCRPT: TRANSIT VEHICLES- OFFICE EQUIPMENT- CAP. MAINT- ETC.
CST: 2001
FED Share:
GA Share:
OTH Share:
$420,000 $210,000
$210,000
$203,000 $180,000
$23,000 $23,000
Page 186 of336
r--------::==::==========================:::::::.::::===========::::..:=========-=.,=-----------~------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _-_._'.., _ - - , .. .. ...... ....... -."'~"'"-',._"'--,------_._---, ~
9/21/00
.....
..
_ _..
-l" _ _ ~""""O:
I. _ _
GLYNN COUNTY
PROJECT: 508009- TYPE WORK: OPERATING
BRUNSWICK TIP #
LENGTH (miles / km)
FUND: TRANSIT 0/0.00
PE:NONE ROW: NONE
DESCRPT: PUBLIC TRANSIT SERVICE FOR BRUNSWICK ANO GLYNN COUNTY
CST: 2002
FED Share:
$450,000 $225,000
OTB Share:
PROJECT: 508010- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
BRUNSWICK TIP #
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: TRANSIT VEHICLES- OFFICE EQUIPMENT. CAP. MAINT- ETC.
CST: 2002
FED Share:
GA Share:
OTH Share:
PROJECT: 50801 I- TYPE WORK: OPERATING
FUND: TRANSIT
. PE:NONE
BRUNSWICK TIP #
LENGTH (miles / km) 0/0.00
. ROW: NONE
DESCRPT: PUBLIC TRANSIT SERVICE FOR BRUNSWICK ANO GL YNN COUNTY
CST: 2003
FED Share:
$225,000
$221,000 $196,000
$25,000 $25,000
$480,000 $240,000
OTH Share:
PROJECT: 508012- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
BRUNSWICK TIP #
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: FACILITY LEASING- OFFICE EQUIPMENT- CAP. MAINT.- ETC
CST: 2003
FED Share:
GA Share:
OTH Shure:
PROJECT: ONR255- TYPE WORK: B1CYCLE/PEO. FACILITY
FUND: REC TRAILS PE: NONE
BRUNSWICK TIP # BATSOI-06
LENGTH (miles/km) 0/0.00
ROW: NONE
DESCRPT: ONR REC TRAILS PROG - ALTAMAH A PARK RECREATIONAL TRAIL
CST: 200 I
FED Shure:
$240,000
$221,000 $196,000
$25,000 $25,000
$125,000 $100,000
PROJECT: TOOOl57 TYPE WORK: CAPITAL
BRUNSWICK TIP #
LENGTH.(mites / km)
DESCRPT: FY 2001 BRUNSWICK SECTION 5310
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share: '
$25,000
.$18,000 $18,000
$5,000
PROJECT: TOOOl58 TYPE WORK: CAPITAL
BRUNSWICK TIP #
LENGTH (miles / km)
DESCRPT: FY 2002 BRUNSWICK SECTION'5310
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$19,000 $19,000
$5,000
PROJECT: TOOOI98 TYPE WORK: CAPITAL
BRUNSWICK TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 BRUNSWICK SECTION 53 10
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$20,000 $20,000 $5,000
Page 187 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
GORDON COUNTY
PROJECT: 0000308 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR 156 @ COLLEGE STREET IN CALHOUN
FUND: STP 0.25 /0.40
PE: 2000 ROW: LOCL CST: 2003 FED Share: GA Share:
UNDERWAY
$361,000 $288,800 $72,200
PROJECT: 0000683 TYPE WORK:' REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.2/0.32
DESCRPT: CR I 34/COUNTY LINE ROAD @ POLECAT CREEK AT MURRA Y CO LINE
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 610750- TYPE WORK: INTERCHANGE LENGTH (miles/km)
DESCRPT: 1-75 @ SR 1561N CALHOUN EXIST. LANES: 03 PROPOSED LANES: 05
FUND: 1M 0.5/0.81
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $9,476,000 $5,631,000 . $5,067,900
$563,100
PROJECT: 610930- TYPE WORK: INTERCHANGE
FUND: STP
LENGTH (miles / km)
1 /1.61
DESCRPT: 1-75 INTERCHANGE'@ SR 136 & WIDENING ON SR 136/61 Y930
ASSOCIATED PROJECTS: 61Y930-
PE: 1995 ROW: 2002 CST:
UNDERWAY $753,000
AFTER 2003
PROJECT: 620780- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 1.65 12.66
DESCRPT: SR 3/US 41 FM S OF SR 156 N TO CALHOUN BYP IN CALHOUN
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 621365-
PE: 1992 ROW: 2001 CST:
UNDERWAY $5,513,000 AFTER 2003
PROJECT: 621360- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 0.7/1.13
DESCRPT: SR 3IUS 41 FM LINE ST. TO N OF SR I56IREDBUD RD IN CALHOUN
EXIST. LANES: 02 PROPOSED LANES: 04
PE:NONE ROW: 2001 CST: 2001
GA Share:
$3,500,000 $1,309,000
$1,309,000
PROJECT: 621365- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 1.612.58
DESCRPT: SR 3/US 41/CALHOUN FM CR 651UNION GROVE RD TO SR 53/INCL BR
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 610870-
PE: 1992 ROW: 2003 CST:
UNDERWAY $1,000,000 AFTER 2003
PROJECT: 621620- TYPE WORK: TURN LANES
FUND: STP
LENGTH (miles / km) 0.84/1.35
DESCRPT: SR 53/CALHOUN FM W C BRYANT PKWY/CS 814 EAST TO SR 3/US 41
PE: 1993 ROW: 2002 CST:
UNDERWAY $265,000
AFTER 2003
Page J88 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00
GORDON COUNTY
PROJECT: .632905- TYPE WORK: REPLACE ~RIDGE LENGTH (miles I km)
DESCRPT: SR 53@SALACOACREEK I MI WEST OF FAIRMOUNT
FUND: BRIDGE 0.24/0.39
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 642390- TYPE WORK: REPLACE BRIDGE LE!VGTH (miles I km)
DESCRPT: SR 156 @ SALACOA CREEK 6 MI NW OF RANGER
FUND: BRIDGE
PE: 1999
0.27 /0.43
ROW: 2002
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$1,153,000 $922,400 $230,600
PROJECT: 642391- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.26 10.42
DESCRPT: SR 156 @ OOTHKALOOGA CREEK I MI WEST OF CALHOUN
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 64239X- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0/0.00
DESCRPT: SR 156 @ JOHNS CREEK ON FLOYD-GORDON CO LNISEE FLOYD 642395
ASSOCIATED PROJECTS: 642395-
PE:NONE ROW: NONE CST: NONE
PROJECT: 67111X- TYPE WORK: SIGNING
FUND: FOREST HWY P. NONE
LENGTH (miles I km) 0/0.00
ROW: NONE
DESCRPT: CALHOUN GAP RD/CR 21OICR 194 FM CR 641 TO CR 482; SEE FLOYD
CST: NONE
ASSOCIATED PROJECTS: 671110-
PROJECT: 671165- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1998
LENGTH (miles I km) 0.25 /0.40
ROW: LOCL
DESCRPT: CR 233/KNIGHT BOTTOM ROAD @ SALACOA CREEK 4.4 M~ W OF RANGER
CST: 2002
FED Share:
GA Share:
UNDERWAY
$630,000 $504,000 $126,000
PROJECT: M000484 TYPE WORK: BRIDGE PAINTING
FUND: 1M .
LENGTH (miles / km) . 0/0.00 DESCRPT: BRIDGE PAINTING@SEVERALLOC IN GO~DON & WHITFIELD COUNTIES
LUMP SUM PROJECT
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$518,000 ,$414,400 $103,600
.,
Page 189 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
,----------------_.----" _.,9-/2-1-/0-0 ----.;..,-------_._-------,--
GRADY COUNTY
PROJECT: 0000451 TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: CR 324/PINE PARK ROAD @ LITTLE TIRED CREEK
FUND: BRIDGE
PE: 200 I
0.25/0.40
ROW: LOCL
CST: 2003
FED Share:
GA Share:
$20,000
$662,000 $529,600 $132,400
PROJECT: 431550- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
, DESCRPT: SR III @TlREDCREEK&OVERFLOW SOUTH OF CAIRO
FUND: BRIDGE
PE: 1995
0,21 /034
ROW: 2000
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY
$2,565,000 $2,052,000
$513,000
PROJECT: 431800- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles / km) 0,22/035
ROW: 2001
DESCRPT: SR 112/PELHAM ROAD @ SAPP CREEK APP 5 MI N OF CAIRO
CST: 2003
FED Share:
GA Share:
UNDERWAY $2,000
$809,000 $647,200 $161,800
PROJECT: 432120- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.21 /034
DESCRPT: SR 93- SR II I @ GIN BRANCH APP 2 MI N OF CAIRO
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 471432- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: MULTI-USE TRAILS IN THE CITY OF CAIRO
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Shure:
OTHShare:
$334,000 $267,000
$67,000
Page 190 of336
._--_._-------
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00
GREENE COUNTY
PROJECT: 0000151 TYPE WORK: LANDSCAPING
FUND:STP
PE: LOCL
LENGTH (miles / km) 0/0.00
ROW: LOCL
DESCRPT: LAKE OCONEE PARKWAY GATEWAY ENHANCE & STORM WATER MANAGEME CST: 2001
FED Share:
PROJECT: 00004X2 TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles / km) 0 /0.00
DESCRPT: 1-20 SAFETY UPGRADES @ 2 LOC MORGAN CO &SR 44/GREENE/0000472
OTHShare:
PE:NONE ROW: NONE CST: NONE
ASSOCIATED PROJECTS: 6000472
$125,000 $100,000
$25,000
PROJECT: 23 I 760- TYPE WORK: REPLACE BRIDGE
FUND: ~RIDGE
PE: 1996
.LENGTH (miles / km) 0.5/0.81
ROW: 2000
DESCRPT: SR 44/JASPER COPELAND BRIDGE OVER RICHLAND CREEK & TURN LNS
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY $1,315,000 $1,052,000
$263,000
PROJECT: 232290- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.23/0.37
DESCRPT: SR 44 @ NORTH FORK LITTLE RIVER 7.8 MI NE OF UNION POINT
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 245100- . TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles / km) 0.43/0.69
ROW: 2001
DESCRPT: SR 15 OVER HARRIS BRANCH 9.7 MILES NW OF GREENSBORO
CST: 2001
FED Share:
GA Share:
UNDERWAY $50,000
$944,000 $755,200 $188,800
PROJECT: 245 I 10- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles / km) 0.5/0.8 I
ROW: 2001
DESCRPT: SR, 15 OVER FISHING CREEK 7.9 MILES NW OF GREENSBORO
CST: 2001
FED Share:
GA Share:
UNDERWAY $50,000
$950,000 $760,000 $190,000
PROJECT: 245 I20- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 15 OVER TOWN CREEK 5.2 MILES N OF GREENSBORO
FUND: BRIDGE
PE: 1997
0.5/0.81
ROW: 2001
CST: 2001
FED Share:
GA Share:
UNDERWAY $50,000
$1,099,000 $879,200 $219,800
PROJECT: 262740- TYPE WORK: RECSTIREHAB
FUND: STP
LENGTH (miles / km) 4.2 /6.76
DESCRPT: LINGER LONGER RDICR 54/55 FM SR 44 TO END(PARTNEW CONST&BR)
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$3,120,000 $2,496,000
$624,000
Page 1910/336
-,--------------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
GREENE COUNTY
PROJECT: 271292- TYPE WORK: LANDSCAPING
FUND: STP
PE: LOCL
LENGTH (miles I km) 0 10.00
ROW: LOCL
DESCRPT: STREETSCAPES & SIDEWALKS IN THE CITY OF GREENSBORO
CST: 2001
$300,000
FED Share:
$240,000
OTHShare:
$60,000
.
Page /91 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00 -
GWINNETT COUNTY
PROJECT: 0000107 TYPE WORK: HISTORIC PRESERVATION
ATLANTA TMA TIP # GW AR BP091 _
LENGTH (miles / km)
DESCRPT: SOUTHEAST RAIL WAY MUSEUM IMPROVEMENTS
FUND:STP 0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000163 TYPE WORK: SIDEWALKS
FUND: STP
ATLANTA TMA TIP # GW AR BP094
LENGTH (miles / km) 0/0.00
DESCRPT: SUGAR HILL WEST PRICE ROAD SIDEWALK AND LANDSCAPING
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000164 TYPE WORK: LANDSCAPING
ATLANTA TMA TIP # GW AR BP095
LENGTH (miles r km)
DESCRPT: BUFORQ STREETSCAPE
FUND: STP 0/0.00
OTH Share:
PE:LOCL ROW: LOCL -CST:200( FED Share:
OTH Share:
PROJECT: 0000165 TYPE WORK: SIDEWALKS
FUND: STP
PE: LOCL
ATLANTA TMA TIP # GW AR BP096
LENGTH (miles/km) 0/0.00
ROW: LOCL
DESCRPT: LAWRENCEVILLE SIDEWALKS ALONG HWY 20/GWINNETT DR TO SIMONTON
CST: 200 J
FED Share:
PROJECT: 0000575 TYPE WORK: TRANSIT FACILITIES
ATLANTA TMA TIP # GW AR 235
LENGTH (miles / km)
DESCRPT: LILBURN COMMUTER RAIL STATION
OTH Share:
FUND:CMAQ
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
PROJECT: 0000576 TYPE WORK: TRANSIT FACILITIES
ATLANTA TMA TIP # GW AR236
LENGTH (m/Jes/ km)
DESCRPT: RONALD REGAN PKWY COMMUTER RAIL STATION
OTH Share:
FUND:CMAQ
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
PROJECT: 0000577 TYPE WORK: TRANSIT FACILITIES
ATLANTA TMA TIP # GW AR 237
LENGTH (miles/km)
DESCRPT: DACULA COMMUTER RAIL STATION
OTH Share:
FUND:CMAQ
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
PROJECT: 0000578 TYPE WORK: TRANSIT FACILITIES
ATLANTA TMA TIP # GW AR 238
LENGTH (miles / km)
DESCRPT: LAWRENCEVILLE COMMUTER RAIL STATION
OTHShare:
FUND:CMAQ
PE.NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
OTH Share:
$972,000 $778,000 $194,000
$282,000 $226,000 $56,000
$1,350,000 $1,080,000
$270,000
$102,000 $82,000 $20,000
$1,500,000 $1,200,000
$300,000
$1,500,000 $1,200,000
$300,000
$1,888,000 $1,510,000
$378,000
$1,500,000 $1,200,000
$300,000
Page 193 of336
------_._---_.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
GWINNETT COUNTY
PROJECT: 110233- TYPE WORK: INTERCHANGE
FUND: 1M
ATLANTA TMA TIP # GW AR 072E
LENGTH (miles I km) 1.7 12.74
DESCRPT: 1-85 FM N OF SUGARLOAF TO N OF OLD PEACHTREE & CD SYSTEM
EXIST. LANES: 08 PROPOSED LANES: 12
PE.NONE ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY $19,638,000 $17,674,200
$1,963,800
PROJECT: 110435- TYPE WORK: REST AREA
ATLANTA TMA TIP # GW AR 186B
LENGTH (miles I km)
DESCRPT: 1-85 DEMOLISH REST AREAS # 75 & # 76
FUND: 1M 010.00
PE: 1995 ROW: NONE CST: 2003 FED Share: GA Share:
UNDERWAY
$350,000 $315,000
$35,000
PROJECT: 110530- TYPE WORK: INTERCHANGE
ATLANTA TMA TIP # GW AR 053A
LENGTH (miles I km)
DESCRPT: 1-85/SR 403 AT SR 316 INTERCHANGE
FUND: 1M 2/3.22
PE: 1997 ROW: 2001 CST:
UNDERWAY $13,623,000 AFTER 2003
PROJECT: 110600- TYPE WORK: WIDENING
ATLANTA TMA TIP # GW AR 191
LENGTH (miles I km)
DESCRPT: 1-85 FM 1-985 TO N/CR 134/HAMILTON MILL RD
EXIST. LANES: 04 PROPOSED LANES: 06
FUND:NHS 7 I 11.27
PE: 2001 ROW: 2002 CST: 2002 FED Share: GA Share:
$2,799,000 $402,000
$27,206,000 $21,764,800
$5,441,200
PROJECT: 110610- TYPE WORK: WIDENING
FUND:NHS
ATLANTA TMA TIP # GW AR 192
LENGTH (mileslkm) 6.3 110.14
DESCRPT: 1-85 FM HAMILTON RD TO N/SR 211/FARl'v1 MARKET RD IN BARROW
EXIST. LANES: 04 PROPOSED LANES: 06
PE: 2001 ROW: 2002 CST: 2003 FED Share: GA Share:
$2,500,000 $402,000
$24,323,000 . $19,458,400
$4,864,600
PROJECT: 110720- TYPE WORK: ATMSIITS
FUND:CMAQ
ATLANTA TMA TIP # GW AR 193
LENGTH (mileslkm) 9.22 114.84
DESCRPT: ATMS/ 1-85 N COMMUNIC/SURVEILANCE FROM SR 316 TO SR 20
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$5,000 $4,000 $1,000
PROJECT: 110800- TYPE WORK: PARK & RIDE LOT
FUND: NHS
ATLANTA TMA TIP # GW 284
LENGTH (mileslkm) 010.00
DESCRPT: 1-85 @INDIAN TRAIL RD MODIFICATIONS TO PARK AND RIDE LOT
PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$500,000 $400,000 $100,000
PROJECT: 121682- TYPE WORK: WIDENING
FUND: STP
ATLANTA TMA TIP # GW 088
LENGTH (mileslkm) 2.94/4.73
DESCRPT: SR 120 FM 1-85 WEST OF ATKINSON RDTO W OF RIVERSIDE PKWY
EXIST. ~ANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: NONE CST: 2003 FED Share: GA Share:
UNDERWAY
$6,014,000 $4,811,200 $1,202,800
Page 194 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
GWINNEtT COUNTY
PROJECT: 121720- TYPE WORK: WIDENI~G
FUND:NHS
ATLANTA TMA TIP # GW 076B
LENGTH (miles 1 km) 3.9/6.28
DESCRPT: SR 124 FM CENTERVILLE-ROSEBUD RD TO HENRY CLOWER BLVD
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 1996 CST: 2003 FED Share: GA Share:
UNDERWAY UNDERWAY $12,495,000 $9,996,000 $2,499,000
PROJECT: 132890- TYPE WORK: BRIDGES
FUND: STP
ATLANTA TMA TIP # GW 279A
LENGTH (miles 1 km) 0.6/0.97
DESCRPT: CR I 880IPLEASANT HILL RD@BUFORD HWY & NS RR/GRD SEP PHI
ASSOCIATED PROJECTS: I3Y890-
PE: 1999 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $ J8,425,000
$9,567,000 $7,653,600 $1,913,400
. PROJECT: 132985- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # GW 288
LENGTH (miles 1 km) 0.3510.56
ROW: 2001
DESCRPT: SR 20/CUMMING HWY @ CHA TTAHOOCHEE RIVER @ FORSYTH CO LINE
CST: 2002
FED Share:
ASSOCIATED PROJECTS: 13298X-
GA Share:
UNDERWAY $10,000
$4,402,000 $3,521,600
$880,400
PROJECT: 132986-' TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
ATLANTA TMA TIP# GW 290
LENGTH (mileslkm) 0.2110.34
DESCRPT: SR 120/DULUTH HIGHWAY @ SINGLETON CREEK 1.5 MI E OF DULUTH
PE: 1999 ROW: 2001 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 133091- TYPE WORK: ATMSIITS
FUND: STP
ATLANTA TMA TIP # GW 282
LENGTH (mileslkm) 8.4/13.52
DESCRPT: ATMS: PEACHTREE INDUST BLVD FM HOLCOMB BR TO ROGERS BR RDS
PE: 2000 ROW: LOCL CST: 2001 FED Share:
OTl/.Share:
PROJECT: I3Y890- TYPE WORK: BRIDGES
FUND: STP
ATLANTA TMA TIP # GW 279B I
LENGTH (miles 1 km) 0.2 10.32
DESCRPT: PLEASANT HILL RD @ BUFORD HWY & NS RR/GRADE SEPARATE 132890
ASSOCIATED PROJECTS: 132890-
PE: 1999 ROW: NONE CST: 2002 , FED Share: GA Share:
$102,000
$914,000 $731,000
$183,000 UNDERWAY
$10,000,000 '$8,000,000 $2,000,000
PROJECT: 142285- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # GW 289
. LENGTH (miles 1 km); 0.25 10.40
ROW: 2001
DESCRPT: SR 324/GRAVEL SPRING RD @ 1-85 4.5 MI SE OF BUFORD
CST: 2001
FED Share:
GA Share:
UNDERWAY $10,000
$1,345,000 $1,076,000
$269,000
PROJECT: 150320- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
ATLANTA TMA TIP# GW274
LENGTH (mileslkm) 0.2210.35
DESCRPT: CR 417/KILLIAN HILL ROAD@YELLOW RIVER 4 MI SE OF LILBURN
EXIST. LANES: 02 PROPOSED LANES: 04
.
ASSOCIATED PROJECTS: 150270-
PE: 2001 ROW: LOCL CST:
$32,000 AFTER 2003
Page 1950/336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
..- 9/21/00
------------"'----~-""""""""""~-- ....._,.,."-----~.,,.,..-_..-.."'''''~'''- ...........'''''
GW1NNETT COUNTY
PROJECT: 162520- TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
ATLANTA TMA TIP # GWARBPOII
LENGTH (miles I km) 2.2/3.54
DESCRPT: WP JONES TRAIL! PLEASANT HILL RD FM RIVER TO BUFORD HWY
PE: 1995 ROW: LOCL CST: 2001
FED Share:
PROJECT: 162522- TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # GW AR BPO19
LENGTH (miles I km)
DESCRPT: BUFORD HWY FM HERAEUS BLVD TO NEAR SR 20
OTH Share:
FUND: CMAQ
PE: 1995
0/0.00
ROW: LOCL
CST: 2001
FED Share:
PROJECT: 162526- TYPE WORK: SIDEWALKS
ATLANTA TMA TIP # GW AR BP04 J
LENGTH (miles I km)
DESCRPT: MILLER RD FM COLE DR TO HAMBRICK DR
OTH Share:
FUND: CMAQ
PE: 1995
0/0.00
ROW: LOCL
CST: 2001
FED Share:
OTHShare:
PROJECT: 171350- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
ATLANTA TMA TIP # GW 216
LENGTH (mileslkm) 0.2/0.32
ROW: LOCL
DESCRPT: CR I959/CENTERVILLE-ROSEBUD RD @ BIG HAYNES CREEK
CST: 2001
FED Share:
GA Share:
UNDERWAY
$500,000 $400,000
$100,000 UNDERWAY
$200,000 $160,000
$40,000 UNDERWAY
$440,000 $352,000
$88,000 UNDERWAY
$384,000 $307,200
$76,800
PROJECT: 171545- TYPE WORK: BRIDGE PAINTING
FUND: STP
ATLANTA TMA TIP # AR 131D
LENGTH (miles I km)
0 10.00
DESCRPT: BRIDGE PAINTING IN GWINNETT AND HALL COUNTIES/17154X
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 17154X-
PE:NONE ROW: NONE
CST: 2001 FED Share:
GA Share:
$628,000 $502,400 $125,600
PROJECT: 171630- TYPE WORK: PARK & RIDE LOT
FUND: STP
ATLANTA TMA TIP # GW AR 228
LENGTH (miles I km) 0 10.00
DESCRPT: SNELLVILLE AREA PARK & RIDEITRANSFER CTR:NEAR US 78 @SR 124
PE: 2002 ROW: LOCL CST:
$100,000 AFTER 2003
PROJECT: 171632- TYPE WORK: VEHICLE PURCHASES
ATLANTA TMA TIP # GW AR 224
LENGTH (mileslkm)
DESCRPT: BUS ACQUISITION: 8-9 LOCAL CNG BUSES
FUND: CMAQ
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
OTHShare:
PROJECT: 171633- TYPE WORK: VEHICLE PURCHASES
FUND: CMAQ
PE.-NONE
ATLANTA TMA TIP # GW AR 225
LENGTH (miles I km) 0 10.00
ROW: NONE
DESCRPT: ACQUISITION OF 4-5 CNG COMMUTER BUSES & RELATED EQUIP
CST: 2002
FED Shure:
OTII Shure:
$3,444,000 $2,755,000
$689,000
$1,969,000 $1,575,000
$394,000
Page 196 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
.._.,.__. _ - - - _.. . __...._.. _-_._-----.-- -~,:_~
9/21/00
--""'--~-"""""'""""""""-~--;~----"""~--._
GWINNETT COUNTY
PROJECT: 171636- TYPE WORK: VEHICLE PURCHASES
ATLANTA TMA TIP # GW AR 223
LENGTH (miles / km)
DESCRPT: PARATRANSIT BUS ACQUISITION: 3-4 CNG BUSES
FUND: CMAQ
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
$297,000 $238,000
OTH Shure:
PROJECT: 107155- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
LENGTH (miles / km) 0 /0.00
ROW: NONE
DESCRPT: TRANSIT CAPITAL (SECTION 5307) ASSISTANCE FOR FY 2001
CST: 2001
FED Share:
GA Share:
OTHShare:
PROJECT: 107157- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: TRANSIT CAPITAL ITEMS
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTHShare:
PROJECT: I V7028- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$59,000
$2,115,000 $1,880,000
$235,000 $235,000
$2,254,000 $2,003,000
$251,000 $251,000
$46,000 $46,000 $12,000
PROJECT: 72214X- TYPE WORK: ATMS/ITS
FUND: CMAQ
ATLANTA TMA TIP # AR 306
LENGTH (miles / km) 5.52 /8.89
DESCRPT: ATMS/SRI41 COMM/SURV FM 1-285 TO SPALDING DRjSEE DEK. 722145
ASSOCIATED PROJECTS: 722145-
PE:NONE ROW: NONE CST: NONE
PROJECT: 74286X- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ATLANTA TMA TIP # FN 088
. LENGTH (miles / km) 0/0.00
DESCRPT: SPALDING DR FROM MT VERNON RD TO SR 140 @ INTER 1742860
ASSOCIATED PROJECTS: 742860-
PE:NONE ROW: NONE CST: NONE
PROJECT: TOOOOl7 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 GWINNETT COUNTY SECTION 5310
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$48,000 $48,000 $12,000
PROJECT: T000027 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 GWINNETT COUNTY SECTION 5310
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Shure:
$51,000 $51,000 . $13,000
Page J 97 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~""~.~_,,......_ . _ .
... ~ _ ._ ._ _
, _....~"'",Il
_
. GWINNETT COUNTY
PROJECT: T000033 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2001 GWINNEIT COUNTY BUS CAPITAL SECTION 5309
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTHShare:
PROJECT: T000034 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 GWINNEIT COUNTY BUS CAPITAL SECTION 5309
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTHShare:
PROJECT: T000036 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 GWINNEIT COUNTY BUS CAPITAL SECTlON 5307
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTHShare:
$5,760,000 $5,120,000
$640,000 $640,000
$5,400,000 $4,800,000
$600,000 $600,000
. $2,401,000 $2,134,000
$267,000 $267,000
Page 198 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00
HABERSHAM COUNTY
PROJECT: 0000138 TYPE WORK: LANDSCAPING
FUND: STP
LENGTH (miles I km) 0 10.00
DESf;RPT: DOWNTOWN CLA.RKESVILLE BUSINESS DISTRICT STREETSCAPE
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000139 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles I km)
DESCRPT: TALLULAH GORGE MULTI-USE TRAIL PHASE 3
FUND:STP 010.00
OTH Share:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 122440- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 17 FM 3-LANE @ BEAVERDAM CK TO SR 115 EXIST. LANES: 02 PROPOSED LANES: 04
FUND:STP 1.37/2.21
'J
PROJECT: 122450- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles I km) 2.05 13.30
DESCRPT: SR 105 RELOC FOR PASSING LANES FRM E OF CR 56 TO W OF CR 53
EXIST. LANES: 02 PROPOSED LANES: 03
OTH Share:
PE:1993 ROW: 2001 CST: 2002 FED Share: GA Share:
PE: 1995 ROW: 1997 CST: 2002 FED Share: GA Share:
$313,000 $250,000
$63,000
$563,000 $450,000
$113,000
UNDERWAY $240,000 $918,000 $734,400 $183,600
UNDERWAY UNDERWAY $2,237,000 $1,789,600
$447,400
PROJECT: 122455- TYPE WORK: BRIDGE REHAB LENGTH (miles I km)
DESCRPT: SR 105 OVER SOQUEE CREEK ...GOES WITH PI 122450 EXIST. LANES: 02 PROPOSED LANES: 03 ASSOCIATED PROJECTS: 122450-
FUND: BRIDGE
PE: 1996
0.41/0.66
ROW: NONE
CST: 2002
FED Share:
GA Share:
UNDERWAY
$1,407,000 $1,125,600
$281,400
PROJECT: 12294X- TYPE WORK: TURN LANES
FUND: STP
LENGTH (miles I km) 0 10.00
DESCRPT: SR365 FM RAMSEY RD TO LC TURNER RD/HABERSHAMISEE HALL 122945
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 122945-
PROJECT: 131080- TYPE WORK: REALIGNMENT LENGTH (miles I km)
DESCRPT: ANTIOCH RD/CR 117 FM SR 17 TO SR 17 ALT
FUND:STP 4/6.44
PE:NONE ROW: NONE CST: NONE
PE: 1992 ROW: 2003 CST:
UNDERWAY $348,000
AFTER 2003
PROJECT: 132 I00- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 1.63 12.62
DESCRPT: SR 105/US 441 BUS FM SR 365 SE TO SOU RR & I-WAY PAIR
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 2002 CST:
UNDERWAY $1,705,000 AFTER 2003
Page 199 of336
_"'__>'1""""'_'
STATE TRANSPORTATION IMPROVEMENT PROGRAM
.."....
9121100
-._,
_4~
.........,_:W
._,_ _, "".....--,._
'HABERSHAM COUNTY
PROJECT: 13256X- TYPE WORK: REPLACE BRIDGE LENGTH ('(Iiles / km)
FUND: BRIDGE 0/0.00
DESCRPT: SR 115 @ CHATTAHOOCHEE RIVER 7.5 MI E. OF CLEVELAND/WHITE
ASSOCIATED PROJECTS: 132560-
PE:NONE ROW: NONE CST: NONE
PROJECT: 171380- TYPE WORK: MINOR WIDEN & RESURF
FUND: FOREST HWY PE: 1996
LENGTH (miles / km) 3.5/5.64
ROW: LOCL
DESCRPT: CR 240/CR 811LOW GAP RD FM CR 245INEW LIBERTY TO PVMT/RABUN
CST: 2001
FED Share:
OTHShare:
UNDERWAY
$2,500,000 $1,250,000
$1,250,000
Page 200 of336
"---,,,,-_._._---_._- --_.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
HALL COUNTY
PROJECT: 0000140 TYPE WORK: . BICYCLE/PED. FACILITY LENGTH (miles I km)
DESCRPT: GAINESVILLE" ROCK CREEK GREENWAY
FUND:STP 010.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000425 TYPE WORK: INTERCHANGE
FUND: NHS
LENGTH (miles I km) 0.4 10.64
DESCRPT: 1-985 NEW INTERCHANGE NO. Of SR 13 CROSSOVER NEAR MARTIN RD
OTHShare:
PE: 2001 ROW: NONE CST: NONE
$563,000 $450,000
$113,000 $10,000
PROJECT: 110400- TYPE WORK: INTERCHANGE
FUND: NHS
LENGTH (mileslkm) 3.4/5.47
DESCRPT: 1-985 SPLIT DIAMOND INTERCHANGE@ SR 13 & SR 53 & CD SYSTEM
PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $12,000,000 $18,266,000 \ $14,612,800 $3,653,200
PROJECT: 110465- TYPE WORK: INTERCHANGE LENGTH (miles I km)
DESCRPT: 1-985 @.SR IIIUS 129 NB EXIT LOOP & SB EXIT EXIST. LANES: 02 PROPOSED LANES: 04
FUND: NHS 1.24 12.00
PE: 1997 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $1,317,000
$11,330,000 $9,064,000 $2,266,000
PROJECT: 121780- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 2/3.22
DESCRPT: SR 53/DA WSONVILLE HWY FM CR 248 @ SARDIS E TO DUCKETT MILL
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 2002 CST:
UNDERWAY $3,898,000 AFTER 2003
PROJECT: 122010- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 369/BROWN'S BR RD FM FORSYTH CO LINE TO SR 53 EXIST. LANES: 02 PROPOSED LANES: 04
FUND:STP 4.9317.94
PE: 1992 ROW: 2003 CST:
UNDERWAY $6,390,000 AFTER 2003
PROJECT: 122020- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 53 FROM SOUTH OF SR 211 TO CEDAR RIDGE DRIVE EXIST. LANES: 02 PROPOSED LANES: 04
FUND:STP 4.4417.15
PROJECT: 12215X TYPE WORK: WIDENING
I
FUND:NHS
.
LENGTH (miles I km) 0/0.00
DESCRPT: SR II/US 129 FM SR 332 @TALMOIJACKSON CO TO SR 323/HALL CO
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 122150-
PE: 1992 ROW: 2001 CST:
UNDERWAY $11,500,000 AFTER 2003
PE:NONE
ROW: NONE
CST: NONE
..
Page 201 of336
__._-------_.,------- STATE TRANSPORTATION IMPROVEMENT PROGRAM
------------~.
9/21/00
HALL COUNTY
PROJECT: 122910- TYPE WORK: ATMSIITS LENGTH (miles I km)
DESCRPT: ATMS/ GAINESVILLE SLO SCAN/CMS/RADAR
FUND: NHS 010.00
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$1,650,000 $1,320,000
$330,000
PROJECT: 122915- TYPE WORK: ATMS/ITS
FUND:NHS
LENGTH (miles / km) 0/0.00
DESCRPT: ATMS/ GAINESVILLE/HALL COUNTY/GDOT REGIONAL TCC
PE.:NONE ROW: NONE CST: 2003 FED Share: GA Share:
$1,000,000 $800,000 $200,000.
PROJECT: 122945- TYPE WORK: TURN LANES
FUND:NHS
LENGTH (miles / km) 17127.35
DESCRPT: SR 365 TURN LANES FM RAMSEY RD TO LC TURNER RD/HABERSHAM
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 12294X-
PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$6,801,000 $5,440,800 $1,360,200
PROJECT: 132690- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR IIIUS 129 AT JIM HOOD ROADINOPONE ROAD
FUND: STP 0.2 /0.32
PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$1,403,000 $1;122,400
$280,600
PROJECT: 13286X- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 3.9 16.28
DESCRPT: SR 53 FM 1-85/JACKSON TO ROAD ATLANTAICR 681/HALL SEE 132860
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 132860-
PE:NONE ROW: NONE CST: NONE
PROJECT: 132995- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 52 @ CANDLER CREEK 5.4 MI SOUTH OF LULA
FUND: BRIDGE 0.22/0.35
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 141820- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 2.4 /3.86
DESCRPT:SR 323/G1LLSVILLE HWY FM MP 0.4 TO MP 2.79 N/SR 82/MP 2.79
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 2002 ROW: CST:
$230,000 AFTER 2003 AFTER 2003
PROJECT: 142290- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.27/0.43
DESCRPT: SR 52 @ CHATTAHOOCHEE RIVER 3 MI NW OF LULA
PE: 2001 ROW: CST:
$31,000 AFTER 2003 AFTER 2003
Page 202 of336
--_._----------- .._---_._.._ - - - - - -
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
HALL COUNTY
PROJECT: 142292- TYPE WORK: REPLACE BRIDGE
FUND: B~IDGE.
LENGTH (miles I km) 0.22/0.35
DESCRPT: SR 323 @ NORTH OCONEE RIVER 7.5 MI SOUTH OF LULA
PE:1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 142293- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
.
LENGTH (miles I km) 0.22 10.35
DESCRPT: SR 323 @N OCONEE RIVER OVERFLOW 7.5 MI SOUTH OF LULA
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 142294- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 3~2 @ WALNUT CREEK 1.7 MI SW OF CANDLER
FUND: BRIDGE 0.23/0.37
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 150200- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 53 FM SR 369/BROWNS BRIDGE RD TO SR 53 CONN EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 1.98/3. I9
PE: 1993 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY . $381,000 $6,686,000 $5,348,800 $1,337,200
PROJECT: 170735- TYPE WORK: WIDENING
FUND: STP
LENGTH (mileslkm) 3.4/5.47
DESCRPT: LAKE LANIER ACCESS RD FM 1-985 TO LAKE (PH 11- LANES 3 & 4)
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1997 ROW: 2003 CST:
UNDERWAY $2,000,000 AFTER 2003
PROJECT:' 17154X- TYPE WORK: BRIDGE PAINTING
FUND: STP
LENGTH (miles I km) 0 10.00
DESCRPT: BRIDGE PAINTING IN GWINNETT AND HALL COUNTIESjl71545
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 171545-
PE:NONE ROW: NONE CST: NONE
PROJECT: 171620- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
. PE: 2001
LENGTH (milesI km) 0.2 I 10.34
ROW: LOCL
DESCRPT: CR 17/F. GAILEY ROAD @ EAST FORK LITTLE RIVER SW OF CLERMONT
CST: 2002
FED Share:
GA Share:
PROJECT: T000094 TYPE WORK: CAPITAL
FUND: BRIDGE
PE:NONE
LENGTH (milesI km) 0 10.00
ROW: NONI:
DESCRPT: ACCESS TO JOBS & REVERSE COMMUTE PROGRAM FOR GAINESVILLE
CST: 2001
FED Share:
OTH Share:
$20,000 $306,000 $244,800
$61,200
$300,000 $150,000 $150,000
Page 203 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9i21/00
HANCOCK COUNTY
PROJECT: 271280- TYPE WORK: BRIDGE PAINTING
FUND: STP
LENGTH (miles / km)
0 /0.00
DESCRPT: BRIDGE PAINTING IN HANCOCK AND RICHMOND COUNTIESI27Y280
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 27I28X- 27Y280-
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
PROJECT: 27Y280- TYPE WORK: BRIDGE PAINTING
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: BRIDGE PAINTING IN HANCOCK AND RICHMOND COUNTIES\27Y280
LUMP SUM PROJECT
ASSOCIATED PROJECTS: 271280-
PE:NONE ROW: NONE CST: 2001 FED Shure: GA Share:
$405,000 $324,000
$81,000
$160,000 $144,000
$16,000
Page 204 of336
---------
STATE TRANSPORTrjTIONIMPROVEMENT PROGRAM
_.. "---<----""-..,. t---"'--- , ~---~"..~.,_._--_.
9121100
'"*""
<>
~.",- ... _~ .. Iol;, ....._ ,.... _ " ' " " " ' ..._
.....I<,.,"","",~."__.
~
HARALSON COUNTY
PROJECT: 0000114 TYPE WORK: BICYCLE/PED. FACILITY
DESCRPT: TALLAPOOSA STREETSCAPE
LENGTH (miles I km)
FUND: STP 010.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$313,000 $250,000
PROJECT: 611320- TYPE WORK: REST AREA
FUND: STP
LENGTH (miles I km) 010.00
DESCRPT: TALLAPOOSA WELCOME CENTER ON 1-20 - SEWER HOOK-UP
LUMP SUM PROJECT
OTHShare:
PE: 2001 ROW: NONE CST: 2001 FED Share: GA Share:
$63,000
$60,000
$1,045,000 $940,500 $104,500
PROJECT: 611322- TYPE WORK: LANDSCAPING
FUND: NHS
LENGTH (miles I km) 0 10.00
DESCRPT: GA VISITOR CTR ON 1-20--ADD TO PARKING AREA & LANDSCAPING
PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$634,000 $507,200 $126,800
PROJECT: 621580- TYPE WORK: PASSING LANES LENGTH (miles I km)
DESCRPT: SR 120 FM W OF BUCHANAN BYP TO LAKE OLYMPIA EXIST. LANES: 02 PROPOSED LANES: 03
FUND: STP 1.2 I 1.93
PE: 1992 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $75,000
$900,000 $720,000 $180,000
PROJECT: 631143- TYPE WORK: MINOR WIDEN & RESURF
FUND: STP
LENGTH (miles I km) 4.6417.47
DESCRPT: CR 342/CASHTOWN RD/SR 898 SP FM CR 346/MORGAN RD N TO CR 345
PE: 1992 ROW: 2001 CST: 2001 FED Share: GAShare:
UNDERWAY $215,000
$2,122,000 $1,697,600
$424;400
PROJECT: 631145- TYPE WORK: MINOR WIDEN & RESURF
FUND: STP
LENGTH (miles I km) 5.28 18.50
DESCRPT: CR 342/440 FM CR 345 N TO CR I68/PLEASANT HILL RD/POLK CO
ASSOCIATED PROJECTS: 63114X-
PE: 1992 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $114,000
$2,614,000 $2,091,200
$522,800
PROJECT: 63 I 175- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.25 10.40
DESCRPT: SR 8 WIDEN;INTERSECT.IMP;BIKE-PED FM FLORIDA AVE TO BRYAN ST
PE: 1992 ROW: 2001 CST: 2001 FED Share: GA Share:
UNDERWAY $68,000
$997,000 $797,600 $199,400
PROJECT: 632915- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 120 @ LITTLE RIVER IN EAST BUCHANAN
FUND: BRIDGE
PE: 2001
0.23/0.37
ROW: 2002
CST: 2003
FED Share:
GA Share:
$20,000 $10,000 $619,000 $495,200 $123,800
Page 205 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
HARALSON COUNTY
PROJECT: 641920- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 120- EB MP 1.36-2.821 WB MP 4.62 TO 6.48 EXIST. LANES: 02 PROPOSED LANES: 03
FUND: STP 3.32/5.35
PE: 2000 ROW: 2002 CST:
UNDERWAY $267,000
AFTER 2003
PROJECT: 642000- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 2.8/4.51
DESCRPT: SR 100- NB & SB PASSING LANES NORTH OF TALLAPOOSA
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 2000 ROW: 2002 CST:
UNDERWAY $63,000
AFTER 2003
PROJECT: 642350- TYPE WORK: NEW CONSTRUCTION .
FUND: STP
LENGTH (miles / km) 2.8/4.51
DESCRPT: STOUFFEL RD FM SR 100 TO SR 81 GOLF COURSE TO SR 8 - NEW LOC
PE: 1999 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $2,000,000 $3,000,000 $2,400,000 $600,000
PROJECT: 642380- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.22 /0.35
DESCRPT: SR 100 AT WALKER CREEK 3 MI S OF TALLAPOOSA
PE: 2000 ROW: 2002 CST:
UNDERWAY $100,000
AFTER 2003
PROJECT: 642420- TYPE WORK: NEW CONSTRUCTION
FUND: STP
LENGTH (miles / km) 2.11 /3.40
DESCRPT: SR 9Q7 FM PLEASANT RDG@HUTCHESON/CARROLL TO SR 8@CASHTOWN RD
EXIST. LANES: 00 PROPOSED LANES: 02
ASSOCIATED PROJECTS: 64242X-
PE: 1999 ROW: 2002 CST:
UNDERWAY $2,000,000 AFTER 2003
PROJECT: 671200- TYPE WORK: SIDEWALKS LENGTH (miles / km)
DESCRPT: STREETSCAPES & SIDEWALKS IN THE CITY OF BREMEN
FUND: STP 0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
$431,000 $345,000
$86,000
Page 206 of336
, - - -...:.",
STATE TRANSPORTATION IMPROVEMENTPRpGRAM
_ 5 '_ _'~~_'~
~'
9/21/00
_ _ ~ ~
~
" _ . _ .... _ _,
, _ _
HARRIS COUNTY
'PROJECT: 0000097 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles I km)
DESCRPT: HAMILTON-PALMETO CREEK WALKING & BIKE CENTER
FUND: STP 0 10.00
PE:LOCL ROW: LOC'L CST: 2001 FED Share:
PROJECT: 322820- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles I km) 1.4912.40
DESCRPT: SR IIUS 27 PASSING LANE N OF HAMILTON - SB Mp 15.10-13.61
EXIST. LANES: 02 PROPOSED LANES: 03
OTH Share:
PE: 1999, ROW: 2002 CST:
$223,000 $178,000
$45,000
UNDERWAY $63,000
AFTER 2003
PROJECT: 332310- TYPE WORK: REPLACE BRIDGE LENGTH (mites I km)
DESCRPT: SR lIUS 27 @MULBERRYCREEK.7 MI ~ OF JCT SR 208
FUND: BRIDGE
PE: 1995
0.24/0.39
ROW: 2001
CST: 2001
FED Share:
GA Share:
UNDERWAY $40,000
$1,393,000 $1,114,400
$278,600
PROJECT: 33282X- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 0 10.00
DESCRPT: SR I/HAMILTON RD FM OLD MOON RD/MUSCOGEE TO FORTUNE HOLE RD
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 332820-
PE:NONE ROW: NONE CST: NONE
PROJECT: 332860- TYPE WORK: WIDENING
FUND: STP
LENGTH (mileslkm) 5.32/8.57
DESCRPT: SR 85 FM MULT-LN NR ELLERSLIE TO WAVERL Y HALL SE CITY LMTS
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1998 ROW: 2002 CST:
UNDERWAY $2,361,000 AFTER 2003
PROJECT: 332870- TYPE WORK:. WIDENING
FUND:STP
LENGTH (miles I km) 2.09/3.36
PESCRPT: SR 85 FM SOUTH CL OF WAVERL Y HALL TO NORTH CITY LIMITS
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1998 ROW: 2002 CST:
UNDERWAY $1,045,000 AFTER 2003
PROJECT: 332880- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 7.18/11.56
DESCRPT: SR 85 FM N OF WAVERL Y HALL TO SR 85 EIW SPLIT @ TALBOT CL
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1998 ROW: 2002 CST:
UNDERWAY $1,573,000 AFTER 2003
PROJECT: 333 I 55- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR IIUS 27 @ MOUNTAIN CREEK 1.6 MI N OF SR 190
FUND: BRIDGE
PE: 1999
0.2210.35
ROW: 2003
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$348,000 $278,400
$69,600
Page 207 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
HARRIS COUNTY
PROJECT: 333156- .TYPE WORK: REPLACE BRIDGE . LENGTH (miles / km)
DESCRPT: SR 103 @ FLAT SHOALS CREEK 11.2 MI W OF SR 116
FUND: BRIDGE 0.26 /0.42
PE: 1999 ROW: 2001 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 343030- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.39 /0.63
DESCRPT: SR 219 AT HOPEWELL CHURCH ROAD/CR 388 IN WHITESVILLE
PE: 1998 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $50,000
$109,000 $87,200 . $21,800
PROJECT: 343040- TYPE WORK: INTERSECTION IMPROVEMENT. FUND: STP LENGTH (miles / km) 0.55 /0.89
DESCRPT: SR 219 AT MCCRARY RD/CR 124 AND LICK SKILLET ROAD/CR 389
PE: 1998 ROW: 200\ CST: 2002 FED Share: GA Share:
UNDERWAY $50,000
$1,000,000 $800,000 $200,000
PROJECT: 343370- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.21 /0.34
ROW: 2003
DESCRPT: SR 116 @ LITTLE PALMETTO CREEK HAMILTON - NE SECTION
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$554,000 $443,200 $110,800
PROJECT: 343371- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 116 @ PALMETTO CREEK 1.4 MI E OF SR I
FUND: BRIDGE
PE: 1999
0.22/0.35
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$786,000 $628,800 $157,200
PROJECT: 343372- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles r km) 0.22/0.35
ROW: 2001
DESCRPT: SR 116 @BETHLEHEM CREEK 6 MILES NE OF HAMILTON
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$318,000 $254,400
$63,600
PROJECT: 371770- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
PE: LOCL
LENGTH (miles 1 km) 010.00
ROW: LOCL
DESCRPT: CORRIDOR FROM NEW DEAL SETTLEMENT TO CHAT-FLINT HERITAGE HWY
CST: 2001
. FED Share:
OTH Share:
$301,000 $241,000
$60,000
Page 208 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
HART COUNTY
PROJECT: 0000166 TYPE WORK: SIDEWALKS LENGTH (miles / km)
DESCRPT: HARTWELL STREETSCAPE
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 110782- TYPE WORK: INTERCHANGE LENGTH (miles / km)
DESCRPT: 1-85 @ SR 106; SR 17 FRANKLIN & SR 77 HART CO. llO?80
FUND: 1M 0/0.00
OTHShare:
PE:NONE ROW: NONE CST: NONE
ASSOCIATED PROJECTS: 110780-
$1,125,000 $900,000
$225,000
Page 209 of336
I
i:. '
, ' . . . .~
f..
J :
'. t.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_.. ..._,_._._._._ _
9/21/00 110_
.__
_ ._ _ __ ~'~
HEARD COUNTY
PROJECT: 362930- TYPE WORK: WIDENING
FUND: HPP
LENGTH (miles / km) 12.4 /20.00
..
DESCRPT: SRI/US 27 FM SR 54ffROUP TO PATTERSON (SOME NEW LOC)& YIX EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 36293X- 36Y930-
PE: 1992 ROW: 2001 CST:
UNDERWAY $6,000,000 AFTER 2003
Page 210 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
.. .... - -,--,..,.,.~...,.,.,.....,. )--~-,",,-'-~---~'''_:~;'''''"'----_._---'-~._' -- _
HENRY COUNTY
PROJECT: 0000561 TYPE WORK: REALIGNMENT
FUND: STP
PE: LOCL
ATLANTATMATIP#HEIIO
LENGTH (miles 1 km) 1.5/2.42
ROW: LOCL
DESCRPT: JODECO RD RELOCATION FM OAK GROVE RD TO SR 42 @CAMPGROUND RD
CST: 200 I
EXIST. LANES: 00 PROPOSED LANES: 02
FED Share:
PROJECT: 0000562 TYPE WORK: WIDENING
FUND: STP
ATLANTA TMA TIP # HE 126B
LENGTH (miles 1 km) 5.1 18.21
DESCRPT: HAMPTON-LOCUST GROVE RD FM STRICKLAND RD TO 1-75: PHASE I
EXIST. LANES: 02 PROPOSED LANES: 04
OTHShare:
PE: LOCL ROW: LOCL CST: 2003 FED Share:
PROJECT: 0000883 TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # AR 157
LENGTH (miles / km)
DESCRPT: SR 138 AT FLAT ROCK ROAD/CR 100
LUMP SUM PROJECT
FUND:STP 0.47/0.76
OTHShare:
PE: 2000 ROW: LOCL . CST: 2002 FED Share: GA Share:
$2,551,000 $2,041,000
$510,000
$10,000,000 $8,000,000 $2,000,000 UNDERWAY
$336,000 $302,400
$33,600
PROJECT: 0001055 TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # AR 157
LENGTH (miles / km)
DESCRPT: SR 155 AT RACE TRACK ROADICR 376
LUMP SUM PROJECT
FUND:STP 0.42/0.68
PE: 2000 ROW: LOCL CST: 2002 FED Share: GA Share:
$38,000
$382,000 $343,800
$38,200
PROJECT: 24538X- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0/0.00
DESCRPT: SR 20@ SOUTH RIVER NEWTON-HENRY CO LINEISEE NEWTON 245380
ASSOCIATED PROJECTS: 245380-
PE:NONE ROW: NONE CST: NONE
PROJECT: 311840- TYPE WORK: INTERCHANGE
FUND: 1M
ATLANTA TMA TIP # HE AR 209
LENGTH (miles / km) . 0.42 /0.68
DESCRPT: 1-75 @ JONESBORO ROAD/SR 920
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995. ROW: 1998 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$4,342,000 $3,907,800
$434,200
PROJECT: 312150- TYPE WORK: INTERCtlANGE
FUND:NHS
ATLANTA TMA TIP # HE AR 215
LENGTH (miles / km) 0.55 /0.89
DESCRPT: 1-75@ HUDSON BRIDGE RD/EAGLES LANDING PKWY/CR 659-BR REPL
EXIST. LANES: 02 PROPOSED LANES: 06
PE: 1999 ROW: NONE CST: 2002 FED Share: GA Share:
UNDERWAY
$10,500,000 $8,400,000 $2,100,000
PROJECT: 321145- TYPE WORK: RECST/REHAB
FUND: STP
ATLANTA TMA TIP # HE 0 I0
LENGTH (miles / km) 11.3 /18.11
DESCRPT: N-S 1-WAY PAIR/MCDONOUGH FM N/RACETRACK RD TO N/CARMICAEL
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 321530- 32R145-
PE: 1992 ROW: 1997 CST: 2003 FED Share: GA Share:
UNDERWAY UNDERWAY $1,417,000 $1,133,600
$283,400 ...
Page 2 J] of336
__ - - - - - - - - - - - - - - - - - _ . - ._-----_._--_._-_ ._.__ -_._-_ _.__ __ _ .
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. . . ._.,""---_.-. _-g-_...-. 9/21/00
-----~---------_~-~,_ _~"""----- ,--"~
HENRY COUNTY
PROJECT: 323070-' TYPE WORK: INTERSECTION IMPROVEMENT
ATLANTA TMA TIP # HE 145
LENGTH (miles 1 km)
DESCRPT: SR 138 AT MILLERS MILL ROAD/CR 665
FUND: STP 0.2 10.32 .
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$360,000 $324,000 $36,000
PROJECT: 332467- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTATMA TIP # HE 128
LENGTH (miles 1 km) 0.42/0.68
ROW: 2001
DESCRPT: SR 155 @ LITTLE COTTON INDIAN CRK 5 MI N OF MCDONOUGH
CST: 2003
FED Share:
GA Share:
UNDERWAY $50,000
$608,000 $486,400 $121,600
PROJECT: 332945- TYPE WORK: SIGNALS
FUND:STP
ATLANTA TMA TIP# HE 122
LENGTH (miles 1 km) 0.42/0.68
DESCRPT: SR 81 AT KEYS FERRY RD
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 332970- TYPE WORK: SIGNALS
ATLANTA TMA TIP # HE 123
LENGTH (miles 1 km}
DESCRPT: SR 81 AT NEW HOPE RD
FUND:STP 0.2/0.32
OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 332975- TYPE WORK: SIGNALS ATLANTA TMA TIP # HE 124 DESCRPT: SR 81 AT RACETRACK RD
LENGTH (miles / km)
FUND: STP 0.2/0.32
OTHShare:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 332980- TYPE WORK: SIGNALS
ATLANTA TMA TIP # HE 120
LENGTH (miles / km)
DESCRPT: SR 155 AT FAIRVIEW RD
FUND:STP 0.2/0.32
OTHShare:
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 333126- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
ATLANTA TMA TIP # HE 154
LENGTH (miles 1 km) 0.23/0.37
ROW: 2001
DESCRPT: SR 155 @ WALNUT CREEK AT MCDONOUGH CITY LIMITS
CST: 2003
FED Share:
GA Share:
$34,000 $27,000 $7,000
$36,000 $29,000
$7,000
$34,000 $27,000
$7,000
$43,000 $34,000
$9,000 UNDERWAY
$10,000 $813,000 $650,400 $162,600
'!.
PROJECT: 333127- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
UNDERWAY
ATLANTA TMA TIP # HE 155
LENGTH (miles / km) 0.25/0.40
ROW: 2001
$10,000
DESCRPT: SR 155 @ BIG COTTON INDIAN CREEK 6 MI N CF MCDONOUGH
CST:
AFTER 2003
!:l
Page 212 0/336
--_._--,---------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
HENRY COUNTY
PROJECT: 343060- TYPE WORK: WIDENING
FUND: STATE
ATLANTA TMA TIP # HE 104
LENGTH (miles I km) 9.2 /14.81
DESCRPT: SR 20 & WOOLSEY RD RELOC FM CR 1336 TO 1-75 INCL HAMPTON BYP
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1998 ROW: 2001 CST: 2001
GA Share:
UNDERWAY
$16,951,000
$33, I 58,000
..
$33,158,000
PROJECT: 343260- TYPE WORK: SIGNALS
ATLANTA TMA TIP # HE 121
LENGTH (miles I km)
DESCRPT: SR 155 @HAMPTON/LOCUST GROVE RD
FUND: STP 0.2 10.32
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 343265- . TYPE WORK: MINOR WIDEN & RESURF
FUND: STP
ATLANTA TMA TIP # HE 126A
LENGTH (miles I km) 4.0816.57
DESCRPT: CR 650/HAMPTON/LOCUST GROVE RD FM SR 20 TO STRICKLAND RD
EXIST. LANES: 02 PROPOSED LANES: 04
OTHShare:
PE: 2001 ROW: LOCL CST:
GA Share:
$37,000 $30,000 $7,000 $5,000 AFTER 2003
$0
PROJECT: 351230- TYPE WORK: SIGNALS
ATLANTA TMA TIP# HE 125
LENGTH (mileslkm)
DESCRPT: WALT STEPHENS RD AT SPEER RD
FUND: STP 0.2/0.32
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 363860- TYPE WORK: PARK & RIDE LOT
FUND: STP
ATLANTA TMA TIP # HE 119
LENGTH (mileslkm) 0/0.00
DESCRPT: JODECO RD EXPAND PARK & RJDE LOT & RELOCATE OCTAGON RD
OTH Share:
PE: 2000 ROW: 2001 CST: 2001 FED Share:
OTH Share:
PROJECT: 363875- TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE:LOCL
ATLANTA TMA TIP # HE AR BP006
LENGTH (miles I km) 0 10.00
ROW: LOCL
DESCRPT: FAIRVIEW RD FM EAST ATLANTA RD TO FAIRVIEW ELEMENTARY
CST: 2002
FED Share:
OTH Share:
PROJECT: 363876- TYPE WORK: BICYCLE/PED. FACILITY
FUND: CMAQ
PE:LOCL
ATLANTA TMA TIP # HE AR BPOI8C
LENGTH (miles I km) 2.4 13.86
ROW: LOCL
DESCRPT: MCDONOUGH EW ONE WAY PAIR FM JONESBORO RD TO KEYS FRY RD
CST: 2001
FED Share:
OTH Share:
PROJECT: 363877- TYPE WORK: BlCYCLE/PED. FACILITY
FUND: CMAQ
ATLANTA TMA TIP # HE AR BPOl8B
LENGTH (mileslkm) 2.4/3.86
PE: LOCL ROW: LOCL
DESCRPT: MCDONOUGH NS ONE WAY PAIR FM GRIFFI}'; ST TO MACON ST&SIDEW ALK . CST: 200 I . FED Share:
.\ OTH Share:
$43,000 $34,000 $9,000 UNDERWAY $360,000 ,. $1,200,000 $960,000 $240,000
$329,000' $263,000 $66,000
$180,000 $144,000
$36,000
$225,000
. $180,000
$45,000
Page 2/3 of336
_ _ _M._._. ._.
'J
STATE TRANSPORTATION IMPROVEMENT PROGRAM
.__._.._. , .
9121,.1._0._0 _" ~.,
__. ~_. "...,. __...
.. _
HENRY COUNTY
PROJECT: 3V7040- TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE:NONE
0/0.00
- ROW: NONE
CST: 2001
FED Share:
GA Share:
$13,000 $13,000
$4,000
PROJECT: 71407X- TYPE WORK: ATMS/ITS
FUND:NHS
ATLANTA TMA TIP# AR 307
LENGTH (miles/ km)
0/0.00
DESCRPT: ATMS/I-75 COMM/SURVEIL FM HUDSON BR RD TO TARA BLVD/CLAYTON
ASSOCIATED PROJECTS: 714075-
PE:NONE ROW: NONE CST: NONE
PROJECT: 72148X- TYPE WORK: WIDENING
FUND:NHS
ATLANTA TMA TIP # CL 031
LENGTH (miles / km) 0/0.00
DESCRPT: SR 138 FM WALT STEPHENS RD/CLA YTON TO 1-75...SEE CLAYTON CO
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 721480-
PE:NONE ROW: NONE CST: NONE
PROJECT: TOOOOl8 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2002 HENRY COUNTY SECTION 5310
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$14,000 $14,000 $3,000
PROJECT: T000028 TYPE WORK: CAPITAL LENGTH (miles / km)
DESCRPT: FY 2003 HENRY COUNTY SECTION 5310
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
$14,000 $14,000 $4,000
Page 214 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9121100
HOUSTON COUNTY
PROJECT: 0000125 TYPE'WORK:
DESCRP:r: PERRY STREETSCAPE
BICYCLE/PED. FACILITY LENGTH (miles I km)
FUND: STP 010.00
PE: LOCL ROW: LOCL CST: 2001 FED Shure:
PROJECT: 0000126 TYPE WORK: BICYCLE/PED. FACILITY
WARNER ROBINS TIP # 2000-2
LENGTH (miles I km)
DESCRPT: CENTERVILLE SIDEWALK SApETY IMPROVEMENTS
FUND: STP 2.45 13.94
OTH Shure:
PE: LOCL ROW: LOCL CST: 2002 FED Shure:
PROJECT: 0000909 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
WARNER ROBINS TIP #
LENGTH (miles I km) 0.28/0.45
DESCRPT: SR 96 AT CR 540ITHOMPSON MILL ROAD/CR 108/0AKY WOODS ROAD
LUMP SUM PROJECT
OTH Shure:
PE: 2000 .ROW: 2002
CST: 2003 FED Shure:
GA Share:
$875,000 $700,000
$175,000
$163,000 . $130,000
$33,000 $21,000 $10,000 $374,000 $336,600 $37,400
PROJECT: 0001018 TYPE WORK: BICYCLE/PED. FACILITY
FUND: RECTRAILS PE.NONE
WARNER ROBINS TIP#
, LENGTH(miles/km) 1.07/1.72
ROW: NONE
DESCRPT: DNR REC TRAILS-BAYGALL CREEK GREENWAY FM CORDER TO KIMBERLY
CST: 2001
FED Share:
OTHShare:
PROJECT: 322960- TYPE WORK: WIDENING
FUND: NHS
WARNER ROBINS TIP # 1998-2
LENGTH (miles / km) 2.65 14.27
DESCRPT: SR 247/US 129 FM GREEN STREET/GATE'1 TO US 41 IN BIBB
EXIST. LANES: 04 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 32296X- 322965-
PE: 2001 ROW: CST:
$125,000 $100,000
$25,000
$1,500,000 AFTER 2003 AFTER 2003
PROJECT: 322965- TYPE WORK: REPLACE BRIDGE .
FUND: BRIDGE
PE: 2001
WARNER ROBINS TIP # 1998-1...
LENGTH (miles I km) 0.27 10.43
ROW: 2001
DESCRPT: SR 247/US 129 NBL @ ECHECONNEE CREEK HOUSTON-BIBB CO LINE.
CST: 2002
EXIST. LANES: 02 PROPOSED LANES: 03
FED Share:
ASSOCIATED PROJECTS: 322960-
GA Shure:
$15,000 $12,000 $3,000,000 $2,400,000 $600,000
PROJECT: 33 I830- TYPE WORK: WIDENING
FUND: STP
WARNER ROBINS TIP # WR I992-1
LENGTH (miles I km) 4 16.44
DESCRPT: HOUSTON LAKE RD FM SR 127@CR279TO SR 96/& INTER@CR 188
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 2001 CST:
UNDERWAY $2,000,000 AFTER 2003
PROJECT: 331860- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 2.65 14.27
DESCRPT: SR 127 FM NORTH PERRY BYPASS TO E OF LAKE JOY ROAD
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 33 I865-
PE: 1994 ROW: 2001 CST: 2003 FEDShllre: GA Share:
UNDERWAY $1,536,000 $7,540,000 $6,032,000 $1,508,000
Page 2/5 of336
STATE TRANSPORTATION IMpROVEMENT PROGRAM
9/21/00
HOUSTON COUNTY
PROJECT: 331865- TYPE WORK: BRIDGE REHAB
WARNER ROBINS TIP # WR 1-1993(5)
LENGTH (miles / km)
DESCRPT: SR 127 AT MOSSY CREEK ILET WITH 331860
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 331860-
FUND: BRIDGE
PE: 1994
0.03 /0.05
~ ROW: NONE
CST: 2003
FED Share:
GA Share:
UNDERWAY
$891,000 $712,800 $178,200
PROJECT: 342340- TYPE WORK: INTERSECTION IMPROVEMENT'
FUND: STP
WARNER ROBINS TIP # WR 1985-6
LENGTH (miles / km) 4.817.73
DESCRPT: SR 247C FM NELSON DRIVE TO SR 247 - INCL INTER IMPROVE
PE: 1992 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$478,000 $430,200
$47,800
PROJECT: 350840- TYPE WORK: WIDENING
FUND: STP
WARNER ROBINS TIP # WR1991-2
LENGTH (miles/ km) 2.81/4.52
DESCRPT: HOUSTON LAKE RD/CR 535 FM SR 96 TO RICHARD RUSSELL PKWY
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY $8,588,000 $6,870,400 $1,717,600
PROJECT: 351070- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
WARNER ROBINS TIP # WR 1-1996( I)
LENGTH (miles / km) 0.26 /0.42
ROW: LOCL
DESCRPT: CR I56/MOODY ROAD @ BAY GALL CREEK IN WARNER ROBINS
CST: 2001
FED Share:
GA Share:
UNDERWAY
$822,000 . $657,600
$164,400
PROJECT: 36376X- TYPE WORK: NEW CONSTRUCTION
FUND: BRIDGE
WARNER ROBINS TIP # WR 1-1996(2)
LENGTH (miles / km) 0/0.00
DESCRPT: RICHARD RUSSELL PKWY FM E OF 1-75 TO CORDER RD/PEACH
ASSOCIATED PROJECTS: 363760-
PE:NONE ROW: NONE CST: NONE
PROJECT: 371730- TYPE WORK: MINOR WIDEN & RESURF
FUND: HPP
WARNER ROBINS TIP# 2000-1
LENGTH (miles! km) 0/0.00
DESCRPT: DAVIS DRI GREEN ST & N HOUSTON RD IN WARNER ROBINS
PE:LOCL ROW: NONE CST: 2002 FED Share:
PROJECT: TOOOl62 TYPE WORK: CAPITAL
WARNER ROBINS TIP #
LENGTH (miles / km)
DESCRPT: FY 2001 WARNER ROBINS SECTION 5310
OTH Share:
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$367,000 $294,000
$73,000
$17,000 $17,000 $4,000
PROJECT: TOOOl63 TYPE WORK: CAPITAL
WARNER ROBINS TIP #
LENGTH (miles / km)
DESCRPT: FY 2002 WARNER ROBINS SECTION 5310
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
-, GA Share:
$18,000 $18,000
$4,000
Page216of336
STATE TIUNSPORTATION IMPROVEMENT PROGRAM
9/21/00
,
...
....,. _ _ . ~ ............
,._
.,
I
'
t_
_
~
_
.
'
K
_
,
"
'
_...........
...
~"
_'''~
.._ .
_
~
...
_
...... ....._ ~_
HOUSTON COUNTY
PROJECT: T000200 TYPE WORK: CAPITAL
WARNER ROBINS TIP #
LENGTH (miles 1 km)
DESCRPT: FY 2003 WARNER ROBINS SECTION 5310
FUND: TRANSIT
PE: NONE
010.00
ROW: NONE
CST: 2003,
FED Share:
GA Share:
$18,000 $18,000
$5,000
".
Page 217 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
JACKSON COUNTY
PROJECT: 0000167 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles I km)
DESCRPT: HOSCHTON RR DEPOT REHAB
FUND: STP 010.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 0001258 TYPE WORK: RIGHTS-OFWAY
FUND: STATE
LENGTH (miles I km) 010.00
DESCRPT: SR 1007/CONNECTOR ROAD PM SR 335 TO SR 15/US441 IN NICHOLSON
PE:NONE ROW: 2001 CST: LOCL
$40,000 $32,000
$8,000
$40,000
PROJECT: 110520- TYPE WORK: REST AREA
FUND: 1M
LENGTH (miles I km) 0 10.00
DESCRPT: 1-85 CONSTRUCT NEW REST AREAS TO REPLACE # 75 AND # 76
PE: 1997 ROW: 2003 CST:
UNDERWAY $423,000
AFTER 2003
PROJECT: 121340- TYPE WORK: BRIDGE REHAB LENGTH (miles I km)
DESCRPT: SR 11/ US 129/ @ ALLEN CREEK N OF TALMO
ASSOCIATED PROJECTS: .122150-
. FUND: BRIDGE
PE: 1986
0.2510.40
ROW: NONE
CST: 2003
FED Share:
GA Share:
UNDERWAY
$460,000 $368,000
$92,000
PROJECT: 122150- TYPE WORK: WlDENING
FUND:NHS
LENGTH (miles I km) 7.4 I 11.91
DESCRPT: SR I1IUS 129 FM SR 332 @TALMO/JACKSON CO TO SR 323/HALL CO
EX1ST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 12215X- 121340-
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $4,700,000 $9,470,000 $7,576,000 $1,894,000
PROJECT: 12216X- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 010.00
DESCRPT: SR 15 ALT/US 129 FM LAVENDER DR/CLARKE TO SR 330/JACKSON
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 122160-
PE:NONE ROW: NONE CST: NONE
PROJECT: 122170- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 6.7 I 10.79
DESCRPT: SR 15 ALT/US 129 FM SR 330 TO JEFFERSON BYP@CR 104
EXIST. LANES: 02 PROPOSED LANES: 04
PE:1992 ROW: 2003 CST:
UNDERWAY $2,741,000 AFTER 2003
PROJECT: 122300- TYPE WORK: WIDENING LENGTII(mileslkm)
DESCRPT: SR 15/US 441 FM S OF CLARKE COUNTY LlNE TO SR 335 EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STATE 6.71/10.80
PE: 1993 ROW: 2002 CST:
UNDERWAY $3,985,000 AFTER 2003
Page 218 of336
STAT'4 TRANSPORTATION IMPROVEMENT PROGRAM
_ _ _ _ _ _ _ _ _ _ _-.......--.., - _..*
JO.,,_. 9/21/00
,
._.~
... _ _ ..., __':AI_.N~
~
JACKSON COUNTY
PROJECT: 122310- TYPE WORK: WIDENING LENGfH (miles I km)
DESCRPT: SR 15/US 441 FM SR 335 TO COMMERCE BYPASS EXIST. LANES: 02 PROPOSED LANES: 04
FUND:NHS 5.19/8.36
PE: 1993 ROW: 2002 CST:
UNDERWAY $6,050,000 AFTER 2003
PROJECT: 122510- TYPE WORK: BRIDGE REHAB LENGTH (miles / km)
DESCRPT: SR 15 ALT IN JEFFERSON AT BIG CURRY CREEK EXIST. LANES: 02 PROPOSED LANES: 03
FUND: BRIDGE
PE: 1993
0.15/0.24
ROW: 2001
CST: 2003
FED Share:
GA Share:
UNDERWAY $20,000
$822,000 $657,600 $164,400
PROJECT: 132860- TYPE WORK: WIDENING
FUND: STP
LENGTH (mileslkm) 3.9/6.28
DESCRPT: SR 53 FM 1-85 IN JACKSON CO TO SR 211IT ANNERS MILL IN HALL
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: I3286X-
PE: 200\ ROW: CST:
$750,000 AFTER 2003 AFTER 2003
PROJECT: 171002- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0.2/0.32
PE: 1994 ROW: LOCL
DESCRPT: CR 367/WHlTES BOTTOM ROAD@WALNUTCREEKNEOFBRASELTON
CST: 2002 FED Share:
GA Share:
UNDERWAY
$353,000 $282,400
$70,600
PROJECT: 171004- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.5 10.81
PE: 1997 ROW: LOCL
DESCRPT: CR 86/JEFFERSON RIVER RD @ CURRY CREEK 3.6 MI E OF ARCADE
CST: 2001 FED Share:
GA Share:
UNDERWAY
$612,000 $489,600 $122,400
PROJECT: 171005- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (mileslkm) 0.2/0.32
ROW: LOCL
DESCRPT: CR 248/HARMONY CHURCH RD @ POND FORK CREEK NE OF TALMO
CST: 2001
FED Share:
GA Share:
UNDERWAY
$385,000 . $308,000
$77,000
Page 219 of336
.. ' ;
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
...._ .... ' " """';_\o~
- - " -_ _~ _ . " " '
"'~""-""'''''''''-'~_'''l
''',_'''''l'_ _
. JASPER COUNTY
PROJECT: 0000152 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
PE: LOCL
LENGTH (miles r km) 0/0.00
ROW: LOCL
DESCRPT: MONTICELLO STREETSCAPE/WELCOME CTRJTRAILHEAD/MUSEUM/BIKEWAY CST: 200 I
FEDShl/re:
ASSOCIATED PROJECTS: 0000995
OTH Share:
PROJECT: 0000423 TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 0.87/ 1.40
DESCRPT: SR 16 WIDENING AT WEST CITY LIMITS OF MONTICELLO
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2003 ROW: CST:
$1,000,000 $800,000
$200,000
$189,000 AFTER 2003 AFTER 2003
PROJECT: 0000426 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles / km)
DESCRPT: SR I I AT POST ROAD/CR 362
FUND: STP 0.2 10.32
PE: 2003 ROW: CST:
$5,000 AFTER 2003 AFTER 2003
PROJECT: 0000995 TYPE WORK: SCENIC HWY PROGRAM
FUND: STP
PE: LOCL
LENGTH (mileslkm) 0/0.00
ROW: LOCL
DESCRPT: MONTICELLO CROSSROADS SCENIC BYWAY INFO CTR & MARKETING PLAN
CST: 200 I
FED Share:
ASSOCIATED PROJECTS: 0000152
GA Shure:
OTH Shure:
PROJECT: 231730- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 4.64 17.47
DESCRPT: SR 83 NB MP 0-I.7214-LN/4' MED MP 18.1-I9.81INB 19.81-21.04
EXIST. LANES: 02 PROPOSED LANES: 04
PE:2001 ROW: 2002 CST:
$899,000 $719,200 .$29,800 $150,000
$388,000 $63,000
AFTER 2003
PROJECT: M000355 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) 010.00
DESCRPT: SR 83 PIPE REPLACEMENT LUMP SUM PROJECT
PE: 1997 ROW: 1999 CST: 2001 FEDShl/re: GA Share:
UNDERWAY UNDERWAY
$300,000 $240,000
$60,000
Page 220 of336
...- . - - - - - - - , - - - - - - - - - - - - - - - - - - - - - - - - - - -
, -STATE T.fUN$P0R.TATIO/yIMPROVEMENT PROGRAM
9/21/00
JEFF DA VIS COUNTY
PROJECT: 523260- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENG,TH (miles 1 km) 0,43/0,69
PE: 1999 ROW: 2001
DESCRPT: SR 19/US 23 NBL@ OCMULGEE RIVER 5,8 MI NW OF HAZLEHURST
CST: 2002
FED Share:
GA Share:
UNDERWAY $20,000
$6,611,000 $5,288,800 $1,322,200
PROJECT: 533177- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles Ikm) 0,23/0.37
DESCRPT: SR 135/US 221 @ HURRICANE CREEK 6,8 MI SW OF HAZLEHURST
PE: 2001 ROW: 2002 CST:
$20,000 $10,000 AFTER 2003
"
Page 22] 0/336
",," _ _ ~N'-"
STATE TRANSPORTATION IMPROVEMENT PROGRAM
'~"_"
'
9/21/00
<1OO . . . . .
~
...._ _ . . . _
.._... _ _,..,,_.._ _,_ ,_....,..l">'_.,_~_
JEFFERSON COUNTY
PROJECT: 222295- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 9.4/15.13
DESCRPT: SR 88/SR 540 FM SR 171 AT GRANGE TO SR 296 SW OF WRENS
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 1999 CST: 2001
GA Share:
UNDERWAY UNDERWAY $19,225,000
$19,225,000
PROJECT: 22229X- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 88 FM CR I06/WASHINGTON TO SR 171/222290 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 222290-
FUND: STATE 0/0.00
PE:NONE ROW: NONE CST: NONE
PROJECT: 22Y120- TYPE WORK: WIDENING
FUND:NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 4IUS I FM WADLEY BYP TO LOUISV'LE BYP- FOR FED PE; 222 I20
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 222 I20-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 22Y I50- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 4/US I/L'VILLE BYP FM USI BUS TO CR 325-FOR FED PE;222150
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 222 I50-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 22Y160- TYPE WORK: WIDENING
FUND:NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 4/US I FM LOUISVILLE BYP TO CR 138 - FOR FED PE; 222160
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 222 I60-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 22Y I70- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 4/US I FM CR 138 TO SR 88/FALL'LINE FWY-FOR FED PE;222170
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 222170-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 231230- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 24/US 221 EB MP 12.6-13.8IWB 1O.0-II.3IEB 3.2-4.3 EXIST. LANES: 02 PROPOSED LANES: 03
FUND: STP 3.6/5.80
PE: 1997 ROW: 2002 CST:
UNDERWAY $50,000
AFTER 2003
PROJECT: 23126X- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: SR 24 WB MP 22-23 .3/EB 24.3-25.6/WB 29-30.3&n-l. I/BURKE
ASSOCIATED PROJECTS: 231260-
PE:NONE ROW: NONE CST: NONE
Page 222 of336
----"_.,--_._------_._----_._-_._-"",,._----
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. __. . . . '. ..""-,.,,';-_.."',. .>---"'.-.......-__._. .,----_...."'<".--'"..:_~---.,.-_
~,... ~ ,".,.-~
9/21/00
_---,~_-.-.._.;.,--",....".-''''''.....,..,--
JEFFERSON COUNTY
PROJECT: 231980- TYPE WORK: REPLACE BRIDGE
FUND: STP
LENGTH (miles/kin) 0.53/0.85
DESCRPT: SR 24/US 221 @ROCKY COMFORT CREEK WEST SIDE OF LOUISVILLE
PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $50,000
$2,288,000 $1,830,400
$457,600
PROJECT: 232265- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 4/US I @ BIG CREEK 9 MI N OF LOUISVILLE
FUND: BRIDGE
PE: 2001
0.22/0.35
ROW: 2002
CST: 2003
FED Share:
GA Share:
$20,000 $10,000 $668,000 $534,400 " $133,600
PROJECT: 232281- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
LENGTH (miles / km) 0.27/0,43
DESCRPT: SR 4 BUS US I BUS @ WILLIAMSON SWAMP CREEK CITY OF WADLEy
PE: 1999 ROW: 2001 CST:
UNDERWAY $10,000
AFTER 2003
. PROJECT: 245390- TYPE WORK:. REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 17 @ BIG CREEK 3 MI SE OF LOUI~VILLE
FUND: BRIDGE 0.23/0.37
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page 223 of336
-------_._------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
JENKINS COUNTY
PROJECT: 221640- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km}
FUND:NHS 1.812.90
DESCllPT: SR'23/US 25 FM NORTH OF SR 23 TO SR 17 BYPASS & BRIDGES (Y)
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 22Y640-
PE: 1996 ROW: 2001
CST: 2001 FED Shure:
GA Share:
UNDERWAY $250,000
$5,019,000 $4,015,200 . $1,003,800
PROJECT: 222530- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 5.7/9.18
DESCRPT: SR 67/SAVANNAH RIVER PARKWAY FM CR 190 TO SR 121
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 2001 CST:
UNDERWAY $1,954,000 AFTER 2003
PROJECT: 222540- TYPE WORK: WlDENING
FUND: STATE
LENGTH (miles / km) 5.27/8.48
DESCRPT: SR 23/SR 12llUS 25 SAV RV PKWY FM SR 67 TO SR 21 & BR [EXC]
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 2002 CST:
UNDERWAY $8,009,000 AFTER 2003
PROJECT: 222550- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 9.2 / 14.8I
DESCRPT: SR I2\1US 25/SAVANNAH RVR PKWY FM CR 16 TO CR 118/BURKE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIA TED PROJECTS: 22255X-
PE: 1993 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $2,283,000
$12,339,000 $9,871,200 $2,467,800
PROJECT: 22Y640- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRPT: SR 23IUS 25 BRIDGES AT OGEECHEE RVR AND 2 OVERFLOWS FOR QIO$
CST: 2001
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 221640-
GA Share:
$10,000,000 $8,000,000 $2,000,000
PROJECT: 245365- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles Zkm) 0.23/0.37
DESCRPT: SR 23 @ BEAVERDAM CREEK I 1.7 MI NW OF MILLEN
.'
PE: 2003 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 262165- TYPE WORK: WIDENING
FUND: HPP
LENGTH (miles / km) 6.96/ I 1.2I
DESCRPT: SR 21/SAV RVR PKWY FM CR 174 TO MILLEN BYPASS/SCREVEN COUNTY
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 26216X-
PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY $13,093,000 $10,474,400
$2,618,600
Page 224 of336
STATErRANSp01lTAT10N IMPROVEMENT PROGRAM
9/21/00
JOHNSON COUNTY.
PROJECT: 222190- TYPE WORK: PASSING LANES
FUND: STP
. LENGTH (miles / km) 4.14 /6.67
DESCRPT: SR 15 AT 3 LOC BTWN WR'IGHTSVILLE & TENNILLE/& WASHINGTON
EXIST. LANES: 02 PROPOSED LANES: 03
ASSOCIATED PROJECTS: 22219X-
PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $116,000
$3,341,000 $2,672,800
$668,200
PROJECT: 23200X- TYPE WORK: PASSING LANES
.
. LENGTH (miles / km)
DESCRPT: SR 31/US 319 NB MP 31.0-32.41 SB 38.8-3.4 /LAURENS-232000
EXIST. LANES: 02 PROPOSED LANES: 03
ASSOCIATED PROJECTS: 232000-
FUND: STP 0/0.00
PE:NONE ROW: NONE CST: NONE
PROJECT: 232285- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 57 @ LITTLE OHOOPEE RIVER .5 MI E OF KITE
FUND: BRIDGE
PE: 19.99
0.29/0.47
ROW: 2003
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$2,128,000 $1,702,400
$425,600
Page 125 of336
---_._----_.
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
JONES COUNTY
PROjECT: 322540- TYPE WORK: NEW CONSTRUCTION
FUND: STP
LENGTH (miles 1 kin) 4/6.44
DESCRPT: GRAY NORTH BYPASS/SR 899 FM GREEN SETTLEMENT RD NE TO SR 22
EXIST. LANES: 00 PROPOSED LANES: 02
PE: 1999 ROW: 2002 CST:
UNDERWAY $823,000
AFTER 2003
PROJECT: 322790- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles 1 km) 3.8/6.12
DESCRPT: SR 44/US 129 SB MP 12.67-14.171 NB MP 1.0-2.21 NB MP 10.7-12
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1997 ROW: 2002 CST:
UNDERWAY $67,000
AFTER 2003
PROJECT: 322892- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 49 @ COMMISSIONER CREEK 7MI SE OF GRAY
FUND: BRIDGE 0.22/0.35
PE: 1999 ROW: 2003 CST: .
UNDERWAY $50,000
AFTER 2003
PROJECT: 332960- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles 1 km) 0.2/0.32
DESCRPT: SR 49 ON SOUTHBOUND SIDE @ MP 2.0-2.1--SLIDE REPAIR
PE: 1998 ROW: 2001 CST: 2001 FEDSllare: GA Share:
UNDERWAY $769,000 $993,000 $794,400 $198,600
PROJECT: 333100- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles 1 km) 0.2 10.32
DESCRPT: SR 22/US 129 -- DRAINAGE IMPROVEMENT NEAR JEFFERSON STREET
PE: 2001 ROW: CST:
$5,000 AFTER 2003 AFTER 2003
PROJECT: 343085- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles 1 km) 1.8 12.90
DESCRPT: SR 18 EASTBOUND FROM MP 24.39/JONES TO MP 0.7I/WILKINSON
EXIST. LANES: 03 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 34308Z-
PE: 1997 ROW: 1997 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$767,000 $613,600 $153,400
Page 226 of336
STATE TRAN$PORTATION IMPROVEMENT PROGRAM
9/21/00
LAMAR COUNTY
PROJECT: 0000127 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: BARNESVILLE STREETSCAPE PHASE II
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 321370- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles 1 km) 4.2 16.76
DESCRPT: SR 18 SB 13.7c 15.2IMONROE/EB 2.3-3.6IWB 3.38-5.1ITL 5.10-5.6
EXIST. LANES: 02 PROPOSED LANES: 03
ASSOCIATED PROJECTS: 32137X-
OTH Share:
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share: ;
$875,000 $700,000
.$175,000
UNDERWAY $240,000
$2,690,000 $2,152,000
$538,000
PROJECT: 322530- TYPE WORK: NEW CONSTRUCTION
FUND: STP
LENGTH (miles 1 km) 1.9/3.06
DESCRPT: BARNESVILLE BYP [TRUCK BYP] FM SR 7/US 341 N. TO SR I8/US4 I
EXIST. LANES: 00 PROPOSED LANES: 02
PE: 1997 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $220,000
$2,404,000 $1,923,200
$480,800
PROJECT: 33 I820- TYPE WORK: WIDENING
..
.LENGTH (miles / km)
DESCRPT: SR 36 FROM HIGH FALLS RD TO JUST WEST OF 1-75
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 33 182X-
FUND: STP 0:86/ 1.38
PE: 1992 ROW: 2001 CST:
. UNDERWAY $902,000
AFTER 2003
PROJECT: 333220- TYPE WORK: INTERSECTION IMPROVEMENT.
FUND: STP
LENGTH (miles / km) 0.35/0.56
DESCRPT: SR 7IUS 341 AT SR 36ITHOMASTON RD & THOMASTON STREET
LUMP SUM PROJECT
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$359,000 $323,100
$35,900
PROJECT: 343391- TYPE WORK:, REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 36 @ BUCK CREEK 9.5 MI N OF BARNESVILLE
FUND: BRIDGE 0.22/0:35
PE: '1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page 227 of336
---- ,,-------'------_._------------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/0fJ
LANIER COUNTY
PROJECT: 0000310 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles 1 km) 032/0,52
DESCRPT: SR 31/US 221 @ SR 37 & SR II I US 129 EAST OF LAKELAND
EXIST- LANES: 02 PROPOSED LANES: 03
PE: 2003 ROW: LOCL CST:
$360,000 AFTER 2003
PROJECT: 422050- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) I I, I 117.87
DESCRPT: SR 38/US84 FM W/ALAPAI-IA RV TO CR207/DlJPONT/CLlNCH & LOWNDES
EXIST, LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 42205X- 422055-
PE: 1993 ROW: 1999 CST: 2001
GA Share:
UNDERWAY UNDERWAY $16,733,000
$16,733,000
PROJECT: M000345 TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR 37 FM SR II LANIER CO TO SR 38 CLINCH CO LUMP SUM PROJECT
FUND: STP 14.6/23.43
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$1,447,000 $1,157,600
$289,400
Page 228 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00 .
LA URENS COUNTY
PROJECT: 0000427 TYPE WORK: INTERSECTION IMPROVEMEN:r LENGTH (miles! km) .
DESCRPT: SR 3 llUS 44 I AT FIRE TOWER ROAD/CR 337 LUMP SUM PROJECT
FUND:STP 0.3/0.48
PE: 2000 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY ~
$206,000 $185,400
$20,600
PROJECT: 0000542 TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 257 FROM 1-I6 TO INDUSTRIAL BLVD EXIST. LANES: 02 PROPOSED LANES: 04
FUND:STP 2.9/4.67
PE: 2001 ROW: 2001 CST: 2001 FED Share: GA Share:
$42,000 $500,000 $4,250,000 $3,400,000 $850,000
PROJECT: 0000767 TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles / km) 0.4 /0.64
DESCRPT: 1-16 SAFETY UPGRADES@SR26/LAURENS & SR 112/BLECKLEY
PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$4,000,000 $3,600,000 . $400,000
PROJECT: 210950- TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles / km) 0.4 /0.64
DESCRPT: 1-16 SAFETY UPGRADES@ SR 199 IN LAURENS & SR 29 IN TREUTLEN
ASSOCIATED PROJECTS: 21095X-
PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:
PROJECT: 221540- TYPE WORK: PASSING Lr\NES
FUND: STP
LENGTH (miles / km) 0.9/1.45
DESCRPT: SR 19 WB MP MP 29.38/W CL DUDLEY TO WITURKEY CRKlMP 30.73
.EXIST. LANES: 02 PROPOSED LANES; 03
PE: 1997 ROW: 2001 CST: 2001 FED Share: GA Share:
UNDERWAY
$8,600,000 $7,740,000
$860,000
UNDERWAY $5,000
$1,663,000 $1,330,400
$332,600
PROJECT: 23 I430- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miies / km) . 9.8/15.78
DESCRPT: SR 29/US 441 FROM CR 471 TO SR 112/WILKINSON -23143X
EXIST. LANES; 02 PROPOSED LANES; 04
ASSOCIATED PROJECTS: 23143X-
PE: 1993 ROW: 2001 CST:
PROJECT: 232000- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 31/US 319NB MP 31.0-32.41 SB 38.8-3.4/.JOHNSON-23200X EXIST. LANES: 02 PROPOSED LANES: 03 ASSOCIATED PROJECTS: 23200X-
FUND: STP 3 /4.83
PE: 2002 ROW: CST:
PROJECT: 232270- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 26/US 80 @ PUGHES CREEK 2.8 MI SE OF BREWTON
FUND: BRIDGE 0.22/0.35
PE: 1999 ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY $5,360,000 AFTER 2003
$100,000 AFTER 2003 AFTER 2003
UNDERWAY $10,000
$401,000 $320,800
$80,200
Page 229 of336
._------------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
LA URENS COUNTY
PROJECT: 245395- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 19 @ WHITEWATER CREEK 13.2 MI SE OF RENTZ
FUND: BRIDGE 0.22/0.35
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 245396- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 19 @ BIG FLAT CREEK 13 MI SE OF DUBLIN
FUND: BRIDGE 0.22/0.35
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 245397- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 19 @ LITTLE FLAT CREEK 12.5 MI SE OF DUBLIN
FUND: BRIDGE 0.22 10.35
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 245398- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 199 @ PUGHES CREEK 6.9 MI SE OF EAST DUBLIN
FUND: BRIDGE 0.22/0.35
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 262027- TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR 31/US 441 FM CR 272 NORTH TO JUST SOUTH OF 1-16 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 26Y027-
FUND: STATE 7.7/12.40
PROJECT: 262040- TYPE WORK: NEW CONSTRUCTION
FUND: STATE
LENGTH (miles r km) 8.7/14.01
DESCRPT: DUBLIN BYP FM US 441 @.5 MI N OF FIRE TOWER RD NW TO US 441
EXIST. LANES: 00 PROPOSED LANES: 04
PE: 1993 ROW: 2002 CST:
UNDERWAY $3,619,000 AFTER 2003
PE: 1992 ROW: 2001 CST:
UNDERWAY $2,351,000 AFTER 2003
PROJECT: 262064- TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR 31IUS 441 FROM SR 46 NORTH TO CR 272 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 26Y064-
FUND: STATE 8.82/14.20
PROJECT: 26206X- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 010.00
DESCRPT: SR 31/US 441 FM N/CR 132 THRU DODGE TO SR 46/..WHEELER
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 262061-
PE: 1993 ROW: 2002 CST:
UNDERWAY $3,000,000 AFTER 2003
PE:NONE ROW.' NONE CST: NONE
Page 230 of336
.-------------,--,-------_._--
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
LA URENS COUNTY
PROJECT: 262570- TYPE WORK: REALIGNMENT
FUND: STP
LENGTH (miles / km) 0.3 /0.48
DESCRPT: RELOCATE SR 257 ALONG JOINER ST/CS 702 IN DUBLINIINCL CLVT
PE: 1996 ROW: 1999 CST: 2001 FED Share: GA Share:
L!NDERWAY UNDERWAY
$752,000 $601,600 $150,400
PROJECT: 271000- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 3.42/5.51
DESCRPT: NATHANIEL DRIVE FROM SR 26 TO SR 1991N EAST DUBLIN
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1994 ROW: LOCL CST: 2001
GA Share:
UNDERWAY $5,623,000 $5,623,000
PROJECT: 271294- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: CITY OF DUBLIN MULTI-USE PATHS
FUND:STP 0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
$1,089,000 $871,000
$218,000
Page 231 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
LEE COUNTY
PROJECT: 0000666 TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: EAST-WEST CONN IN LEESBURG @NS #TEMPI77 . LUMP SUM PROJECT
FUND: STP 0/0.00
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$100,000 $80,000 $20,000
PROJECT: 431730- TYPE WORK: WIDENING
FUND: STP
ALBANY TIP # H/R-99-5
LENGTH (miles / km) 5.94/9.56
DESCRPT: SR 91/PHILEMA RD FM CR 51GRAVES SPGS RD NE TO SR 32
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2000 ROW: 2002 CST:
UNDERWAY $1,300,000 AFTER 2003
PROJECT: 432090- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
ALBANY TIP # BR-I
LENGTH (miles / km) 0.27/0.43
DESCRPT: SR 32 @ MUCKALEE CREEK APP 2.5 MI E OF LEESBURG
PE: 2001 ROW: 2003 CST:
$25,000 $10,000 AFTER 2003
PROJECT: 432091- TYPE WORK: REPLACE BRIDGE .
FUND: BRIDGE
ALBANY TIP # BR-2
LENGTH (miles / km) 0.22/0.35
DESCRPT: SR 32 AT FLINT RIVER OVERFLOW 0.45 MILE FM WORTH CO LINE
PE: 2001 ROW: 2003 CST:
$20,000 $10,000 AFTER 2003
PROJECT: 432092- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
ALBANY TIP #
LENGTH (miles / km) 0.36/0.58
DESCRPT: SR 32 @ FLINT RIVER APP 9 MI E OF LEESBURG
PE: 2001 ROW: CST:
$158,000 AFTER 2003 AFTER 2003
PROJECT: 462395- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 9.3/14.97
DESCRPT: SR 3/US 19 FM NORTH OF CR 151 NW TO SUMTER CL @ SMITHVILLE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 46Y395-
PE: 1992 ROW: 2002 CST:
UNDERWAY $1,723,000 AFTER 2003
PROJECT: M000482 TYPE WORK: BRIDGES LENGTH (miles / km)
DESCRPT: BRIDGE REHAB @ I LOC IN LEE CO LUMP SUM PROJECT
FUND: STP 0/0.00
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$100,000 $80,000 $20,000
Page 232 of336
, - - - - - - - - - - - - - ------,_. STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00'
LIBERTY COUNTY
PROJECT: 0000455 TYPE WORK:
DESCRPT: SR 38!US 84 AT SR J96
INTERSECTION IMPROVEMENT LENGTH (miles I km)
FUND: NHS 0.83 11.34
PE: 2000 ROW: 2002 CST: 2002 FEDS1lare: GA Share:
UNDERWAY $790,000 , $508,000 $406,400 $101,600
PROJECT: 5.11140- TYPE WORK: WIDENING
FUND: 1M
LENGTH (miles I km) 13.3/21.41
DESCRPT: 1-95 FM MCINTOSH CO LINE TO SOUTH OF JERICO RIVER
EXIST, LANES: 04 PROPOSED LANES: 06
PE: 1993 ROW: 2001 CST:
UNDERWAY $53,000
AFTER 2003
PROJECT: 511142- TYPE WORK: BRIDGE REHAB
FUND:NHS
LENGTH (miles I km) 0.4 10,64
DESCRPT: 1-95 AT SOUTH AND NORTH NEWPORT RIVERS & MCINTOSH COUNTY
EXIST. LANES: 04 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 51114X-
PE: 1993 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$10,450,000 $8,360,000 $2,090,000
PROJECT: 511152- TYPE WORK: BRIDGE REHAB LENGTH (miles I km)
DESCRPT: 1-95 @ JERICO RIVER"L1BERTY/BRYAN EXIST, LANES: 04 PROPOSED LANES: 08
FUND:NHS 0.0510.08
PE: 1993 ROW: NONE
CST: 2001 FED Share:
GA Share:
UNDERWAY
$5,236,000 $4,188,800 $1,047,200
PROJECT: 520781- TYPE WORK: WIDE.NING
FUND: STP
LENGTH (miles I km) , 8,85 /14.25
DESCRPT: SR 196 FM US84/SR 38 TO SR 25/US 17 SW OF 1-95
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 2001 CST:
UNDERWAY , $2,461,000
AFTER 2003
PROJECT: 521190- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 196/@BAKER SWAMP StOUGH EXIST. LANES: 02 PROPOSED LANES: 05
FUND: BRIDGE 0.32 10.52
PE: 1984 ROW: 1987
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY
$574,000 $459,200 $114,800
PROJECT: 53260X- 'TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles/km) 0/0.00
DESCRPT: SR 144 PASSING LANES THROUGH FORT STEWAR ISEE LONG-532600
ASSOCIATED PROJECTS: 532600-
PROJECT: 550600- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: FRANK COCHRAN DRIVE FM SR 119 TO HERO ROAD EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 2.7/4.35
PE:NONE ROW: NONE CST: NONE
PE: 2003 ROW: LOCL CST:
$338,000 AFTER 2003
Page 233 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
LIBERTY COUNTY
PROJECT: M000344 TYPE WORK: SHOULDER WORK
FUND: STP
LENGTH (miles / km) 11.7 / 18.89
DESCRPT: SR 144 FM TRINITY RD LIBERTY CO TO W OF SR 405/1-95 BRYAN CO
LUMP SUM PROJECT
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$899,000 $719,200 $179,800
Page 234 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
LINCOLN COUNTY
PROJECT: 0000153 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: DOWNTOWN LINCOLNTON STREETSCAPE
FUND:STP 0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 231360- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 2.71/4.36
DESCRPT: SR 47 FM SR 43 CONN TO .5 NW OF CR 80 - TWO PASSING LANES
EXIST. LANES: 02 PROPOSED LANES: 03
OTH Share:
PE: 1997 ROW: 2001 CST:
$188,000 $150,000
$38,000
UNDERWAY $105,000
AFTER 2003
PROJECT: 231920- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 43/47 TRAFFIC IMPROVEMENTS IN LINCOLNTON EXIST. LANES: 02 PROPOSED LANES: 03 .
FUND:STP. 213.22
PE: 2001 ROW: CST:
$74,000 AFTER 2003 AFTER 2003
Page 235 of336
I
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_.<._,. -...._ _. ,. _. . \'lOl_ _
_w<.,,.._,,",.'~'~_.
_ _ .,.
9/21/00
. _......_ _
_ _ _ _....... _ ' "
-.-.._~
LONG COUNTY
PROJECT: 0000431 TYPE WORK: WATER POLLUTION MITIG.
FUND: STP
LENGTH (miles I km) 0/0.00
DESCRPT: WETLAND MITIGATION @ PARCEL 2 GDOT SITE IN LONG CO
LUMP SUM PROJECT
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
......
_
$3,142,000 $2,513,600
$628,400
PROJECT: 532600- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles I km) 5 /8.05
DESCRPT: SR 144 PASSING LANES THROUGH FT STEWART/BRYAN-LIBERTY/53260X
EXIST. LANES: 02 PROPOSED LANES: 03
ASSOCIATED PROJECTS: 53260X-
PE: 2003 ROW: CST:
$110,000 AFTER 2003 AFTER 2003
Page 236 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
LOWNDES COUNTY
PROJECT: 0000083 TYPE WORK: BICYCLE/PED. FACILITY LENGTH, (miles / km)
DESCRPT: VALDOSTA MULTI-USE TRAIL
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Shure:
OTH Share:
PROJECT: 0000684 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km): 0.2 J /0.34
DESCRPT: CS I 191/TUCKER ROAD @ DUKES BAY CANAL IN SOUTH VALDOSTA
PE: 2001 ROW: LOCL CST:
$949,000 $759,000
$190,000 $20,000
AFTER 2003
PROJECT: 410500- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 13.4 /21.57
DSCRPT: 1-75 FM NORTH OF SR 133 TO COO~ COUNTY LINE - PHASE I
EXIST. LANES: 04 PROPOSED LANES: 06
PE: 1993 ROW: 2001 CST: 2001 FED Share: GA Share:
UNDERWAY $250,000
$47,781,000 $38,224,800 $9,556,200
PROJECT: 42205Z- TYPE WORK: WIDENING LENGTH (miles / km)
FUND: STATE 0 /0.00
DESCRPT: SR 38/US84 FM W/ALAPAHA RV TO CR 207 IN DUPONT/SEE LANIER CO
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 422050-
PROJECT: 422710- TYPE WORK: BRIDGES
FUND: STP
LENGTH (miles / km) 0.5 /0.8 I
DESCRPT: SR 38/US 84/W HILL AVE GRADE SEPARATION AT NORFOLK SOU RR
PE:NONE ROW: NONE CST: NONE
PE: 2001 ROW: 2003 CST:
$1,500,000 $2,400,000 AFTER 2003
PROJECT: 431680- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.66/1.06
DESCRPT: SR 7/US 4 I AT CR 570 AND CR 868/HAHIRA RD
PE: 1997 ROW: 2001 CST: 2001 FED Share: .GA Share:
UNDERWAY $25,000
$1,797,000 $1,617,300
$179,700
PROJECT: 432100- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.33 /0.53
DESCRPT: SR 31 @ WITHLACOOCHEE RIVER JUST NORTH OF GA-FLA STATE LINE
PE:2001 ROW: CST:
$56,000 AFTER 2003 AFTER 2003
PROJECT: 442780- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.37 /0.60
PE: 1997 ROW: LOCL
DESCRPT: CR 777/CAT CREEK ROAD@ CAT CREEK OVERFLOW SW OF BARRETTS
CST: 2001
FEDShllre:
GA Share:
UNDERWAY
$713,000 $570,400 $142,600
Page 237 of 336
._._-._---
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
LOWNDES COUNTY
PROJECT: 442790- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles / km) 0.37/0.60
ROW: LOCL
DESCRPT: CR,777/CAT CREEK ROAD@CAT CREEK APP 3 MI SW OF BARRETTS
CST: 2001
FED Share:
GA Share:
'>
PROJECT: 442960- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.3 I /0.50
DESCRPT: SR 122 @ WITHLACOOCHEE RIVER APP 4.5 MI E OF HAHIRA
PE: 1999 ROW: 2003 CST:
UNDERWAY
$582,000 $465,600 $116,400
UNDERWAY $10,000
AFTER 2003
PROJECT: 442961- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.25/0.40
DESCRPT: SR 122 @ CAT CREEK APP 9 MI E OF HAHIRA
PE:2000 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page 238 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
LUMPKIN COUNTY
PROJECT: 0000141 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: DAHLONEGA STREETSCAPES
FUND: STP 0/0.00
PE: LOCL ROW: LOCL' CST: 2001 '. FED Share:
OTH Share:
PROJECT: 0000307 TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 52@ETOWAHRIVER4.5MI W OF DAHLONEGA
FUND: BRIDGE 0.23/0.37
PE: 2002 ROW: CST:
$250,000 $200,000
$50,000
$54,000 AFTER 2003 AFTER 2003
PROJECT: 0000565 TYPE WORK: REPLACE BRIDGE
FUND: STP
LENGTH (miles / km) 0.22/0.35
DESCRPT: AURARIA ROAD/CR 226 OVER CROOKED CREEK SE OF DAHLONEGA
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
Page 239 of336
--_._-----_._--
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
MACON COUNTY
PROJECT: 322285- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 90 @ CSX RR SOUTH OF IDEAL NEAR CR 57
FUND: BRIDGE
PE: 1992
0.2/0.32
ROW: NONE
CST: 2003
FED Share:
GA Share:
UNDERWAY
$1,200,000 $960,000 $240,000
PROJECT: 332300- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles / km) 0.24 / O. 39
ROW: 2001
DESCRPT: SR 49/0GLETHORPE ROAD @ FLINT RIVER OVERFLOW WEST MONTEZUMA
CST: 2001
FED Share:
GA Share:
UNDERWAY $6.000
$1,072,000 $857,600 $214,400
PROJECT: 333070- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: SR 127 @SR 1281 SR 128 CfJ} SR 901 SR 224@SR 26 & SIGNING
PE: 1999 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $10,000
$292,000 $233,600
$58,400
PROJECT: 343340- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 240 @ BUCK CREEK APP 5 MI S OF IDEAL
FUND: BRlDGE
PE: 1999
0.27/0.43
ROW: 2001
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$1,250,000 . $1,000,000
$250,000
PROJECT: 343350- TYPE WORK: REPLACE BRIDGE LENGTH (miles/km)
DESCRPT: SR 329 @ HOGCRAWL CREEK NEAR DOOL Y CO LINE
FUND: BRIDGE
PE: 2001
0.23/0.37
ROW: 2002
CST: 2003
FED Share:
GA Share:
$20,000 $10,000 $750,000 $600,000 $150,000
PROJECT: M000340 TYPE WORK: SHOULDER WORK
FUND: STP
LENGTH (miles I km) 16.7/26.84
DESCRPT: SR 26 FM STAGECOACH RD MACON CO TO SR 7 HOUSTON CO
LUMP SUM PROJECT
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$1,739,000 $i,391,200
$347,800
Page 240 of 336
STATE TRANSPORTATIONIMPROVEMENT PROGRAM
9/21/00
MADISON COUNTY
PROJECT: 122180- TYPE WORK: WIDENING
FUND: STP
.
LENGTH (miles / km) 6.5 / 10.47
DESCRPT: SR 8 FM CR 228 @ DIAMOND HILL TO CR 88IIRWIN KIRK ROAD &CL VT
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJI;:CTS: 122185-
PE: 1992 ROW: 2001 CST:
UNDERWAY $1,986,000 AFTER 2003
PROJECT: 122190- TYPE WORK: WIDENING
FUND:.STP
, LENGTH (miles / km) 4.3 /6.92
DESCRPT: SR 8/US 2.9 FM SR,106 TO CR 228 @ DIAMOND HILLIINCL CLVT
EXIST. LANES: 02 PROPOSED LANES: 04
p,E:1992 ROW: 2001 CST:
UNDERWAY $1,834,000 AFTER 2003
. PROJECT: 12Y100- TYPE WORK:', .WIDENING
FUND:NHS
LENGTH (miles / km)
0/0.00
DESCRPT: SR'72 FM SR 172 E TO W CITY LIMITS/COMER- FqR FED PEl 122100
. EXIST. LANES: 02 PROPOSED LANES: 05
ASSOCIATED PROJECTS: 122100-
PE:2001 ROW: NONE eST: NONE
$1,000
PROJECT: 12Y65Q- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km)
0/0.00
'DESCRPT: SR 72 FM WCL OF COMER TO BROAD RVRlELBERT -FOR FED PE/122650,
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 122650-
PE: 2001 ROW: NONE eST:'NONE
$1,000
'. PROJEcT: 132400- TYPE WORK: PASSING LANES
.
FUND: STP
LENGTH (miles / km) 1.2/1.93
PE: 1996 ROW: 2001
DESCRPT: SR 106 M.P. 1.35 N. OF SR 106 TO MP 2.55 N OF CR In
CST: 2003
EXIST. LANES: 02 PROPOSED LANES: 03
FED Share:
GA Share:
UNDERWAY $77,000
$1,081,000 $864,800 $216,200'
PROJECT: 170787- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE:2000
..
LENGTH ("dIes / km) 0.2 /0.32
ROW: LOCL
.DESCRPT: CR 221IMCCARTY-DODD ROAD@BRUSH CREEK 2.2 MI NE OF COLBERT
eST: 2003
FED Share:
GA Share:
UNDERWAY
$288,000 $230,400
$57,600
Page 241 of336
_ _,....
STATE TRANSPORTATION IMPROVEMENT PROGRAM
...._ _ ~_"'."" ...-.._-"'....._._~
9/21/00
....._ " " " _ _ _ _"" x,_"".....,.."_.,,.._~
~
. ....,...,.."'_..". ""'""''''_X_<'"'_._......._ ,._x-......,._~,
"'_<>.<-""'<_,_"'~~,.,.,.,,,,"'
MARION COUNTY
PROJECT: 332280- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1998
LENGTH (miles / km) 0.21 /0.34
ROW: 2001
DESCRPT: SR 41/BROAD STREET @ CEN. OF GA. RAILROAD IN BUENA VISTA
CST: 2002
FED Share:
GA Share:
UNDERWAY $333,000 $938,000 $750,400 $187,600
PROJECT: 343010- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles / km) 0.23/0.37
ROW: 2001
DESCRPT: SR 355 OVER JUNIPER CREEK AT TALBOT COUNTY LINE
CST: 2001
FED Share:
GA Share:
UNDERWAY $57,000
$1,127,000 $901,600 $225,400
PROJECT: 343355- TYPE WORK: REPLACE BRIDGE , LENGTH (miles / km)
DESCRPT: SR 137 @ OOCHEE CREEK 2.5 MI E OF JCT SR 41
FUND: BRIDGE
PE: 1999
0.22 /0.35
ROW: 2001
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$313,000 $250,400
$62,600
PROJECT: 343356- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 137 @BUCK CREEK.7 MI W OF JCT SR 240
FUND: BRIDGE
PE: 1999
0.23/0.37
ROW: 2002
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$438,000 $350,400 $87,600
Page 242 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. 9/21/00
MCDUFFIE COUNTY
PROJECT: 222255- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 10.3 /16.57
DESCRPT: SR 17/10 FM CR 6/SMITH MILL RDTO WASHINGTON BYPASS/WILKES
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 22225X- 22Y255-
PE: 1994 ROW: 2003 CST:
UNDERWAY $3,005,000 AFTER 2003
.PROJECT: 227815- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
LEJYGTH (miles I km) 0.23 /0.37
DESCRPT: SR 10/U.S 78 @HARTCREEK 9.5 MI N OF' THOMSON
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
pROJECT: 227816-TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
. LENGTH (miles / km) 0.24 /0.39
DESCRPT: SR IO/US 78 @ BIG CREEK 8 MI N OF THOMSON
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 22Y250- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 0 /0.00
DESCRPT: SR 1711 0 FM SR 43 TO CR 6/SMITH MILL RD - FOR FED PE; 222250
EXIST. LANES: 02 PROPOSED LANES: 05
. ASSOCIATED PROJECTS: 222250-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 232320- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.23 /0.37
DESCRPT: SR 47/US 221 @ HEADSTALL CREEK 5.3 MI S OF DEARING
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 262400- TYPE WORK: NEW CONSTRUCTION
FUND: STATE
LENGTH (miles/ km) 7.5/12.08
DESCRPT: THOMSON BYP/ FM SR 17 @ CR 311 NE NEW LOC TO SR 17 @ CR 20
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIA TED PROJECTS: 26Y400-
PE: 1993 ROW: 1994 CST: 2001
GA Share:
UNDERWAY UNDERWAY $17,068,000
$17,068,000
PROJECT: 26Y400- TYPE WORK:. NEW CONSTRUCTION
FUND:NHS
LENGTH (miles / km) 0 /0.00
DESCRPT: THOMSON BYP/SR IO/US 78 PART OVER 1-20 TO CR 26/DALLAS DR
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 262400-
PE:2001 ROW: NONE CST: NONE
$1,000
Page 243 of336
_ _ _ _ _.:ool:O_.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
.
.~.
9/21/00 .."'~._'...
_ ..
..'\'....... """".".~"
JI>'.. l!IIIIU..
" " _ ,_ _
MCINTOSH COUNTY
PROJECT: 511110- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles I km): 4.21 16.78
DESCRPT: 1-95 FM ALTAMAHA RIVER @ GLYNN CL TO I-MILE NORTH OF SR 251
EXIST. LANES: 02 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 5 I II 12-
PE: 1993 ROW: 2002 CST:
UNDERWAY $17,000
AFTER 2003
PROJECT: 511120- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: 1-95 FM I-MILE NORTH OF SR 251 TO SR 57 -- PHASE 1 EXIST. LANES: 04 PROPOSED LANES: 06
FUND:NHS 8.4 /13.52
PE: 1993 ROW: 2001 CST:
UNDERWAY $11,000
AFTER 2003.
PROJECT: 51114X- TYPE WORK: BRIDGE REHAB
FUND: NHS
LENGTH (miles I km)
010.00
DESCRPT: 1-95 AT SOUTH & NORTH NEWPORT RIVERS IMCINTOSH COUNTY
ASSOCIATED PROJECTS: 511142-
PE:NONE ROW: NONE CST: NONE
Page 244 of336
STATE TRANSPORTA-TIONIMPROVEMENT PROGRAM
9/21/00
MERIWETHER COUNTY
PROJECT: 332800- TYPE WORK: PASSING LANES LENGTH (miles 1 km)
DESCRPT: SR 18174/109 AT FIVE LOCATIONS/UPSON - 33280X EXIST. LANES: 02 PROPOSED LANES: 03 ASSOCIATED PROJECTS: 33280X-
'FUND: STP 6.99/11.25
PE: 1999 ROW: 2002 CST:
UNDERWAY $138,000
AFTER 2003
PROJECT: 333180- TYPE WORK: REPLACE BRIDGE LENGTH (mites r km)
DESCRPT: SR 85 - SR 74 @PAPPYS CREEK.5 MI N OF WOODBURY
' FUND: BRIDGE
PE: 1999
0.21/0.34
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY . $10,000 $270,000 $216,000 $54,000
PROJECT: 333181- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles 1 km) 0.26 10.42
ROW: 2001
DESCRPT: SR 85 - SR 74 @ RED OAK CREEK 3.5 MI N OF WOODBURY
CST: 2002.
FED Share:
GA Share:
UNDERWAY $10,000
$859,000 . $687,200
$171,800
PROJECT: 333182- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles 1 km) 0.26 10.42 .
ROW: 2001
DESCRPT: SR 85 - SR 74 @ WI-liTE OAK CREEK .4 MJ N OF ALVATON
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$870,000 $696,000 $174,000
PROJECT: 333183-. TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 85 ALT @ CSX RAILROAD IN WARMSPRINGS
FUND: BRIDGE
PE: 1999
0.22 10.35
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$386,000 $308,800
$77,200
PROJECT: 333184- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
.
LENGTH (miles 1 km) 0.22/0.35
DESCRPT: SR 85 ALT @ POUND CREEK 2 MI S OF WOODBURY
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
. AFTER 2003
PROJECT: 333200- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 85 @ CANE CREEK 1.7 MI S OF WOODBURY
. FUND: BRIDGE 0.24 10.39
PE: 1999 ROW: 2001 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 333201- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles 1 km) 0.27 10.43
DESCRPT: SR 85 @ CSX RAILROAD IN WOODBURY
PE: 2001 ROW: CST:
$40,000 AFTER 2003 AFTER 2003
Page 245 of336
_ _ _ _.
.:...-C-_-...:._ _- ' -
_
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
MER1WETHER COUNTY
PROJECT: 333202- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
i LENGTH (miles km) 0.21 10.34
PE: 1999 ROW: 2001
DESCRPT: SR 18/US 27 ALT. @ KENDALL CREEK 2 MI S OF GREENVILLE
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$270,000 $216,000 $54,000
PROJECT: 363850- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles I km) 0.25 10.40
DESCRPT: WARM SPRINGS SOUTH BYPASS/E ST/SR 976 FM SR 85W TO SR 41
EXIST. LANES: 02 PROPOSED LANES: 04
PE.'NONE ROW: 2001 CST: 2002
GA Share:
$131,000 $175,000
$175,000
Page 246 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
MILLER COUNTY
.. PROJECT: 422210- .: TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 9.3 /14.97
DESCRPT: SR IIUS 27 FR W CL @COLQUITTTOCR 279/DAMASCUS-HILTON RD
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 422215- 42Y210-
PE: 1993 ROW: 2002 CST:
UNDERWAY $2,857,000 AFTER 2003
PROJECT: 432140- TYPE WORK: REPLACE BRIDGE . LENGTH (miles / km)
DESCRPT: SR 91 @ AYCOCK CREEK APP 4 MI S OF COLQUITT
FUND: BRIDGE 0.24 /0.39
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 432 I41- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.23 /0.37
DESCRPT: SR 91 @ CYPRESS CREEK 2.5 MI W OF COLQUITT
PE: 1999 ROW~2003
CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 471434- TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: CITY OF COLQUITT STREETSCAPE
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
$236,000 $189,000
$47,000
Page 247 of336
--------------,----
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
MITCHELL COUNTY
PROJECT: 422690- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
LENGTH (miles / km) 0.22 /0.35
PE: 1999 ROW: 2002
DESCRPT: SR 3/US 19- SR 300 SBL @ WETHINGTON SLOUGH S OF BACONTON
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$499,000 $399,200
$99,800
PROJECT: 422691- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.22 /0.35
ROW: 2002
DESCRPT: SR 3/US 19~ SR 300 SBL @ RACCOON CRK SOUTH OF BACONTON
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$589,000 $471,200 $117,800
PROJECT: 43115X- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0/0.00
DESCRPT: CR 299 @ BIG CREEK APPROX 3 MI E OF JCT SR III ITHOMAS CO
ASSOCIATED PROJECTS: 431150-
PE:NONE ROW: NONE CST: NONE
PROJECT: 43115Z- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0/0.00
DESCRPT: CR 299 @ LITTLE CREEK APPROX 3 MI E OF JCT SR 111 ITHOMAS
PE:NONE ROW: NONE CST: NONE
~
ASSOCIATED PROJECTS: 431 152-
PROJECT: 442740- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles / km) 0.51 /0.82
ROW: LOCL
DESCRPT: CR 307 AT BIG SLOUGH AND OVERFLOW IN NORTH CAMILLA
CST: 2003
FED Share:
GA Share:
UNDERWAY
$783,000 $626,400 $156,600
PROJECT: 442975- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 93 @ LOST CREEK APP 1.5 MI N OF COTTON
FUND: BRIDGE 0.23 /0.37
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 442976- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.22 /0.35
, DESCRPT: SR 93 @ SPENCE MILL CREEK .2 MI N OF GRADY CO LINE
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
. AFTER 2003
PROJECT: M000338 TYPE WORK: SHOULDER WORK LENGTH (miles / km)
DESCRPT: SR 112 FM GRADY CO LN TO WORTH CO LN LUMP SUM PROJECT
FUND: STP 28.5 /45.82
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$1,451,000 $1,160,800
$290,200
Page 248 of336
..
-
_ _ _ _ _ _ _ _ ......
N
J
STATE TRANSPORTATION IMPROVEMENT PROGRAM
. .. _-""~_~~_,
~_.t
.....,..,_._. 9/21/00 .~
U _ _.. _ _M .......,_""""
"''''''_ _~ ... _ _'''''''. _ _ '''t,..,..,..,. _ _, ,..._.:,:_.....~
." ...,.......<...-""_"""_.~,
MONROE COUNTY
PROJECT: 0000685 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.2 /0.32
DESCRPT: CR 59/REEDY CREEK ROAD @ TOBESOFKEE CREEK TRIB.
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 0000686 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.21 /0.34
DESCRPT: CR 59lREEDY CREEK ROAD @ TOBESOFKEE CREEK 5 MI S OF FORSYTH
PE: 2001 ROW: LOCL CST:
$22,000 AFTER 2003
PROJECT: 311740- TYPE WORK: ~RIDGE REHAB
FUND: 1M
LENGTH (miles / km) 0.25 /0.40
DESCRPT: 1-475/SR 408 NBL @ 1-751 ADD ONE LANE & REPLA BRIDGE DECK
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1994 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $50,000
$4,000,000 $3,600,000
$400,000
PROJECT: 32137X- TYPE WORK:, PASSING LANES
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: SR 18 BTWN BARNESVILLE & FORSYTH/PASSING & TL...SEE LAMAR CO
ASSOCIATED PROJECTS: 321370-
PE:NONE ROW: NONE CST: NONE
PROJECT: 342920- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 19 PASSING LANES SB FM MP 8.196 TO MP 6.319 EXIST. LANES: 02 PROPOSED LANES: 03
FUND:STP 1.88/3.03
PE: 2003 ROW: CST:
$100,000 AFTER 2003 AFTER 2003
PROJECT: 343167- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 42 @ ECHECONNEE CREEK 6 MI E OF CULLODEN
FUND: BRIDGE 0.23 / 0~37
PE: 1999 ROW: 2002
CST: 2003
FED Share:
GA Share:
UNDERWAY $50,000
$610,000 $488,000 $122,000
PROJECT: 370813- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
,LENGrH (miles / km) 0.4/0.64
ROW: LOCL
DESCRPT: CR I58/ROCKY CREEK ROAD@LITTLE TOWALIGA RIVER W OF 1-75
CST: 2002
FED Share:
GA Share:
UNDERWAY
$228,000 $182,400
$45,600
PROJECT: M000416 TYPE WORK: BRIDGES
FpND: 1M
.
LENGTH (miles / km) 0/0.00
DESCRPT: 1-75 OVER LITTLE TOWALIGA RVIDECK OVERLAYIPE ONLY
LUMP SUM PROJECT
PE: 2001 ROW: NONE CST: NONE
$50,000
, Page 249 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
MONROE COUNTY
PROJECT: M000458 TYPE WORK: ACCELERATION / DECEL LANE LENGTH (miles / km)
DESCRPT: SR 401/1-75 FM MP 190 TO MP 191 LUMP SUM PROJECT
FUND:NHS I /1.61
PE: 2001 ROW: NONE CST: NONE
$160,000
Page 250 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
-MONTGOMER Y COUNTY
. PROJECT: 522520- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles 1 km) 2.4 13.86
DESCRPT: SR 15 BTWN HIGGSTON & TARRYTOWN/NB MP 5.0-6.4ISB 8.7-9.7/
EXIST. LANES: 02 PROPOSED LANES: 03
PE:1995 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $5,000
$1,057,000 $845,600 $2/1,400
PROJECT: 532330- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles 1 km) 0.24/0.39
ROW: LOCL
DESCRPT:. CR 16.9/THOMPSON POND ROAD@TlGERCREEK 4 MI SE OF TARRYTOWN
CST: 2002
FED Share:
GA Share:
UNDERWAY
$546,000 $436,800 $109,200
PRO./.ECT: 5424 10- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (mileslkm) 0.22/0.35
DESCRPT: SR 56 @ MILLIGAN CREEK IN CITY LIMITS or UVALDA
PE: 1999 ROW: 2002 CST:
UNDERWAY $/0,000
AFTER 2003
PROJECT: 550610- TYPE WORK: TURN LANES
FUND: STP
LENGTH (miles 1 km) 0.65 1 1.05
DESCRPT: SR 292/VIDALIA FM MORN'SIDE - LOWERY WIRIGT ON WILSON
ASSOCIATED PROJECTS: 5506IX-
PE: 1995 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $500,000
$2,000,000 $/,600,000
$400,000
PROJECT: 570760- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: CR 12 @TlGER CREEK 3 MI SE OF TARRYTOWN
FUND: BRIDGE
PE: 200/
0.22/0.35
ROW: LOCL
CST: 2002
FED Share:
GA Share:
$20,000
$4/8,000 $334,400
$83,600
PROJECT: 57/455- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: CR / @ TIGER CREEK I MI E OF TARRYTOWN
FUND: BRIDGE
PE: /999
0.22/0.35
ROW: LOCL
CST: 2003
FED Share:
GA Share:
UNDERWAY
$421,000 $336,800
$84,200
Page 251 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
- - _ .__. _ - - - - - _ _ _ _... .... =_.".,"'''',._*~_..._.
_._.~
:_ _ ...... >_><n,..._.,~,....,....'''''''_.,.._".,,.,;'',.'...-...._
_
MORGAN COUNTY
PROJECT: 0000472 TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles / km) . 0.6/0.97
DESCRPT: 1-20 SAFETY UPGRADES @ SR 24; BUCKHEAD RD & SR 44/GREENE; X
ASSOCIATED PROJECTS: 00004X2
PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$11,400,000 $10,260,000
$1,140,000
PROJECT: 0001222 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.36/0.58
DESCRPT: SR 24/ATHENS HIGHWAY @ HARD LABOR CREEK & BIG SANDY CREEK
PE: 2002 ROW: CST:
$120,000 AFTER 2003 AFTER 2003
PROJECT: 210920- TYPE WORK: INTERCHANGE LENGTH (miles I km)
DESCRPT: 1-20 SAFETY UPGRADES @ NEWBORN RD AND SR 83
FUND: 1M 0.4 /0.64
PE: 1998 ROW: NONE CST: 2001 FED Share: GA SIMre:
UNDERWAY
$7,600,000 $6,840,000
$760,000
PROJECT: 245285- TYPE WORK: REPLACE BRIDGE.
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.21 /0.34
ROW: LOCL
DESCRPT: CR 251/SEVEN ISLAND ROAD @ SUGAR CREEK 1.8 MI S OF BUCKHEAD
CST: 2001
FED Share:
GA Share:
UNDERWAY
$568,000 $454,400 $113,600
Page 252 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
MURRA Y COUNTY
PROJECT: 0000687 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.22/0.35
DESCRPT: CR 4IDENNIS MILL ROAD@ ROCK CREEK 5.6 MI SE OF CHATSWORTH
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 620399- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 52 @ CSX RR IN CHATSWORTH
FUND: BRIDGE
PE: 1996
0.17 /0.27
ROW: 1996
CST: 2001.
FED Share:
GA Share:
UNDERWAY UNDERWAY
$1,732,000 $1,385,600
$346,400
PROJECT: 621260- TYPE WORK: REALIGNMENT LENGTH (miles / km)
DESCRPT: SR 282 RELOCATION FM SR 61IUS 411 E TO CR 309 EXIST. LANES: 00 PROPOSED LANES: 02
FUND: STP 1.2 / 1.93
PE: 1992 ROW: 2002 CST:
UNDERWAY $51,000
AFTER 2003
PROJECT: 631550- TYPE WORK: WIDENING
FUND: STP
.LENGTH (miles / km) 4 /6.44
DESCRPT: SR 225/SPRING PLACE BYP - NEW HOPE RD TO SR 225 S OF MILL CK
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 2002 CST:
UNDERWAY . $2,856,000 AFTER 2003
PROJECT: 642370- TYPE WORK: BRIDGES
FUND: STP
LENGTH (miles / km) 0.15 /0.24
DESCRPT: CR 19!OLD FEDERAL ROAD GRADE SEPARAT!ON AT CSX RAILROAD
PE: 2000 ROW: LOCL CST: 2002 FED Share: GA Share:
. UNDERWAY
$800,000 $720,000 $80,000
PROJECT: 642410- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 282 @ ROCK CREEK 5.3 MI S OF CHATSWORTH
FUND: BRlDGE 0.22/0.35
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 671212- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: MURRAY COUNTY BIKE LANES PHASE I
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 671230- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) 0.23/0.37
DESCRPT: RELOCATE CR 231 CONSTRUCT A CANOEIKA YAK RAMP & PARKING AREA
PE: 2001 ROW: 2003 CST: 2003 FED Share: GA Share:
$233,000 $186,000
$47,000
$50,000 $10,000 $527,000 $421,600 $105,400
Page 253 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
MUSCOGEE COUNTY
PROJECT: 0000099 TYPE WORK: 'BICYCLE/PED. FACILITY
COLUMBUS TMA TIP # WSTRIAL-2000
LENGTH (miles / km)
DESCRPT: WARM SPRINGS RAIL LINE BIKE/PED TRAIL
FUND: STP 12/19.32
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 0000342 TYPE WORK: MINOR WIDEN & RESURF
FUND: NHS
COLUMBUS TMA TIP #
LENGTH (miles / km) 1.31 /2.11
DESCRPT: MACON RD/SR 22SP FM UNIVERSITY AVE/CS 959 TO REESE RD/CS2111
PE: 2001 ROW: CST:
$1,250,000 $1,000,000
$250,000
$100,000 AFTER 2003 AFTER 2003
PROJECT: 0000343 TYPE WORK: INTERSECTION IMPROVEMENT
COLUMBUS TMA TIP # ST-LR-32
LENGTH (miles / km)
DESCRPT: RIVER RD/SR 219 AT 54TH STREET/CS 1425 IN COLUMBUS
FUND: STP 0/0.00
PE: 2001 ROW: CST:
$10,000 AFTER 2003 AFTER 2003
PROJECT: 311445- TYPE WORK: WIDENING
FUND:NHS
PE: 1992
UNDERWAY
COLUMBUS TMA TIP # 91-ST-2001
LENGTH (miles/ km) 2.83/4.56
ROW: 2001
$319,000
DESCRPT: I-I 85/COLUMBUS FM SR 520 TO ST MARYS ROAD
CST: 2003
$13,966,000 .
EXIST. LANES: 04 PROPOSED LANES: 06
FED Share:
$11,172,800
ASSOCIA TED PROJECTS: 3 I 1630-
0.
GA Share:
$2,793,200
PROJECT: 311630- TYPE WORK: INTERCHANGE
COLUMBUSTMA TIP # 91-ST-2001
LENGTH (miles / km)
DESCRPT: 1-185 INTERCHANGE AT SR I/SR 520
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 311445-
FUND: 1M 1.61/2.59
PE: 1994 ROW: 2001 CST:
UNDERWAY $2,107,000 AFTER 2003
PROJECT: 321810- TYPE WORK: BRIDGE REHAB
FUND:NHS
COLUMBUS TMA TIP # 86-UD-3001
LENGTH (miles / km) 0.69/ L11
DESCRPT: SR I1US 27/4TH AVENETERANS PKWY FM 13TH ST TO 19TH ST
EXIST. LANES: 04 PROPOSED LANES: 06
PE: 1992 ROW: 1998 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY $5,454,000 $4,363,200 $1,090,800
PROJECT: 323005- TYPE WORK: ATMSIITS
FUND:NHS
COLUMBUS TMA TIP # ST-LR-25
LENGTH (miles / km) 0/0.00
DESCRPT: ATMSI COLUMBUS/MUSCOGEE COUNTY/GDOT REGIONAL TCC
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$1,000,000 $800,000 $200,000
PROJECT: 332820- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP # 98-SR-0 I
LENGTH (miles / km) 15.5 /24.96
DESCRPT: SR INETERANS PWY FM OLD MOON RD TO FORTUNE HOLE RD/HARRIS
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 33282X-
PE: 1998 ROW: 2003 CST:
UNDERWAY $12,000,000 AFTER 2003
Page 254 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
MUSCOGEE COUNTY
PROJECT: 350690- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
PE: 1992
COLUMBUS TMA TIP # 86-SR-1 00 I
LENGTH (miles 1 km) 1.04/1.67
ROW: 1997
DESCRPT: SR 22 SPUR/MACON RD @ AUBURN AVE & BOXWOOD BLVD IN COLUMBUS
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY
$868,000 $694,400 $173,600
, PROJECT: 350730- TYPE WORK: WIDENING
FUND: STP
PE: 1993
COLUMBUS TMA TIP # 86-SR-2007
' LENGTH. (miles I km) 2.02/3.25
ROW: 1998
DESCRPT: TALBOTTON RD/SR 982/COLUMBUS FM 7TH AVE TO WOODRUFF/HILTON-Y
CST: 2002
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 35Y730-
GA Share:
. UNDERWAY UNDERWAY $10,3 I6,000 $8,252,800 $2,063,200
PROJECT: 350780- TYPE-WORK: WIDENING
FUND: STP
PE: 1992
COLUMBUS TMA TIP # 79-SR-2003
LENGTH (miles I km) . 2.14/3.45
ROW: 2001
DESCRPT: FOREST RD FM MACON{+MACON IMPROV} TO WOODRUFF FA/FLOYD RD-Y
CST: 2002 '
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 35Y780-
GA Share:
I
UNDERWAY $882,000
$6,073,000 $4,858,400 $1,214,600
PROJECT: 350785- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP # 79-SR-2016
LENGTH (miles 1 km) 1.9/3.06
DESCRPT: FORESTRD/SR 983 FM WOODRUFF FARM/FLOYD RD TO SCHATULGA &Y
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 35Y785-
PE: 1992 ROW: 2001 ' CST: 2002 ' FED Share: GA Share:
PROJECT: 350790- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP # 79-SR-2020
LENGTH (miles1 km) 0.91 I J.47
DESCRPT: ST MARYS RO/CS 2108/COLUMBUS FM BUENA VISTA TO ROBIN RD .
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY $1,000,000 $4,825,000 $3,860,000
$965,000
UNDERWAY
$1,939;000 $1,551,200
$387,800
PROJECT: 350870- TYPE WORK: WIDENING
FUND: NHS
COLUMBUS TMA TIP # 93-BR- I002
LENGTH (miles /ikm) 3.43 15.52
DESCRPT: SR 22 SP/MACON RD FM WOODRUFF FARM RD/CR 99 TO SR.22/US 80
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 350875-
PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$8,565,000 $6,852,000 $1,713,000
PROJECT: '350875- TYPE WORK: BRIDGE REHAB
COLUMBUS TMA TIP # 93-BR-IOOI
LENGTH (mileslkm)
DESCRPT: SR 22 SP/MACON RD @ BULL CREEK
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 350870-
FUND: BRIDGE
PE: 1992
0.02/0.03
ROW: NONE
CST: 2001
FED Share:
GA Share:
UNDERWAY
$4n,000 $376,800
$94,200
PROJECT: 350880- TYPE WORK: ,WIDENING
FUND: NHS
COLUMBUS TMA TIP # 92-SR-200 I
LENGTH (miles 1 km) 1.67 12.69
DESCRPT: MACON RD/SR 22SP FM REESE RD/CS2 I II TO WOODRUFF FRM RD/CR 99
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 1999 ' CST: 2001 . FED Share: GA Shure:
UNDERWAY UNDERWAY $4,081,000 $3,264,800
$816,200
Page 255 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
MUSCOGEE COUNTY
PROJECT: 350970- TYPE WORK: NEW CONSTRUCTION
FUND: STP
COLUMBUS TMA TIP # 98-SR-1660
LENGTH (miles I km) 2.1 13.38
DESCRPT: NEW ROAD/ MILLER TO BILLINGS RD & HOLLAND DR TO GATEWAY DR
EXIST. LANES: 00 PROPOSED LANES: 02
PE: 2001 . ROW: LOCL CST: 2002 FED Share: GA Share:
$5,000
$448,000 $358,400
$89,600
PROJECT: 351000- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
PE: 1996
COLUMBUS TMA TIP # 79-SR-2004
LENGTH (miles I km) 0.2/0.32
ROW: LOCL
DESCRPT: SR 22SP/MACON RD/WYNNTON AT BROWN AVENUE AND PEACOCK AVENUE
CST: 200 I
FED Share:
GA Share:
UNDERWAY
$587,000 $469,600 $1 17,400
PROJECT: 351010- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP #
LENGTH (miles I km) 0.67 I 1.08
DESCRPT: CS 1618/WHITTLESEY ROAD FROM WHITESVILLE RD TO VETERANS PKWY
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1998 ROW: LOCL CST: 2003 FED Share: GA Share:
UNDERWAY
$1,828,000 $1,462,400
$365,600
PROJECT: 351020- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP # 86-SR-2002
LENGTH (miles I km) 0.5 10.81
DESCRPT: CS'1425/54TH STREET FROM CHUMAR DR TO VETERANS PARKWAY
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1998 ' ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$685,000 $548,000 $137,000
PROJECT: 351190- TYPE WORK: WIDENING
COLUMBUS TMATIP # BV-2002
LENGTH (miles I km)
DESCRPT: BUENA VISTA ROAD FM 1-185 TO DOGWOOD DRIVE
EXIST. LANES: 05 PROPOSED LANES: 06
FUND: STP 0.41/0.66
PE: 2001 ROW: LOCL CST:
$\00,000
.-
AFTER 2003
PROJECT: 35Y780- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP # 79-SR-2003
LENGTH (miles I km) 0 10.00
DESCRPT: FORREST RD FM MACON RD TO WOODRUFF FARM RD- Q23 $ 350780
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 350780-
PE: 1992 ROW:200J CST: NONE
UNDERWAY $3,828,000
PROJECT: 35Y785- TYPE WORK: WIDENING
' FUND: STP
COLUMBUS TMA TIP # 79-SR-2016
LENGTH (miles Ikm) 0/0.00
DESCRPT: FORREST RD FM WOODRUFF FARMIFLOYD TO SCHATULGA-Q23 $; 350785
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 350785-
PE: 1992 ROW: 2001 CST: NONE
UNDERWAY $8,750,000
PROJECT: 371762- TYPE WORK: BICYCLE/PED. FACILITY
FUND:STP
COLUMBUS TMA TIP # 98-NRVRWLK
LENGTH (miles I km) 0/0.00
DESCRPT: RIVERWALK TRAIL ALONG CHATTAHOOCHEE RIVER PHASES 1&2
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
$2,500,0~0
$2,000,000
$500,000
Page 256 of336
---_._-- ._---
..._-_._--_._.._ . _ - - - - - _..__. _ - -
STATE TRANSPORTATION IMPROVEMENT PROGRAM'
9/21/00
MUSCOGEE COUNTY
PROJECT: 302005- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
COLUMBUS TMA TIP #
LENGTH (miles / km) 0 /0.00
ROW: NONE
DESCRPT: TIRE LEASING; ENGINE REBUILD PROGRAM:.TRANSMISSION REBUILD
CST: 2001
FED Share:
GA Share:
OTH Share:
PROJECT: 302007- TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles/ km)
DESCRPT: TRANSIT CAPITAL ITEMS
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002.
FED Share:
GA Share:
OTHShare:
PROJECT: 302010- TYPE WORK: CAPITAL COLUMBUS TMA TIP # DESCRPT: TRANSIT COACHES
LENGTH (miles / km)
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTH Share:
PROJECT: 302011- TYPE WORK: CAPITAL COLUMBUS TMA TIP # DESCRPT: TRANSIT COACHES
LENGTH (miles / km)
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTH Share:
PROJECT: 3V7038- TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$1,199,000 $1,066,000
$133,000 $133,000
$1,235,000 $1,098,000
$137,000 $137,000
$450,000 $400,000
$50,000 $50,000
$450,000 $400,000
$50,000
$50,000
~
$43,000 $43,000 $11,000
PROJECT: T000134 TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 COLUMBUS SECTION 5307 CAPITAL
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
PROJECT: TOOOl35 TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles / km) .
DESCRPT:FY 2003 COLUMBUS SECTION 5309. CAPITAL
FUND: TRANSIT . PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTHShare:
PROJECT: TOOOl36 TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 COLUMBUS SECTION 5310 CAPITAL
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Shores
$4,046,000 $3,596,000
$450,000 $450,000
$450,000 $400,000
$50,000 $50,000
$47,000 $47,000 $12,000
Page 257 of336
__ .... ..._---------
_-_._ .. ..:--_......,
.. -'.---_.,---_.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
.... .._-"",.,,...... ..__._ . ."'.. ...-.:"',..,.. ..._ - - ""'.,....,..~
~-----_
~~..-
~-_
9121100
----.,;--"'------;-~,.~,.-------_
MUSCOGEE COUNTY
PROJECT: T000226 TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles / km)
DESCRPT: FY 2002 COLUMBUS SECTION 53 I0 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$45,000 $45,000 $11,000
Page 258 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
NEWTON COUNTY
PROJECT: 0000168 TYPE WORK: SIDEWALKS LENGTH (miles I km)
DESCRPT: COVINGTON WEST STREET STREETSCAPE
FUND: STP 010.00
PE: LOCL ROW: LOCL .CST: 2001 .
FED Share:
PROJECT: 0000842 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles I km)
DESCRPT: SR I 62/SALEM ROAD AT SPRING ROAD/CR 33 LUMP SUM PROJECT
FUND:STP 0.32/0.52
OTH Share:
PE: 2001 ROW: LOCL CST: 2003 FED Share: GA Share:
$164,000 $131,000
$33,000
$22,000
$328,000 $295,200
$32,800
PROJECT: 210530- TYPE WORK: INTERCHANGE
FUND: 1M
LNGTH(mileslkm) 0.71/1.14
DESCRPT: 1-20 @ SR 142-12/COVINGTON (INCL RELOC OF FRONTAGE RD/CR 72)
ASSOCIATED PROJECTS: 231220-
PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $5,250,000 $4,223,000 $3,800,700 $422,300
PROJECT: 210810- TYPE WORK: WIDENING
FUND:NHS
LENGTH (miles I km) 1.8212.93
DESCRPT: 1-20 FM ALCOVY ROAD INCL INTERCHANGE TO SR 142 IN COVINGTON
EXIST. LANES: 04 PROPOSED LANES: 06
PE:1998 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $110,000
$9,050,000 $7,240,000 $1,810,000
PROJECT: 210860- TYPE WORK: LIGHTING LENGTH ('~iles I km)
DESCRPT: 1-20 AT EXIT 45AJALCOVY ROAD -- Lk;HTING LUMP SUM PROJECT
FUND:NHS 0.48/0.77
PE: 1997 ROW: NONE CST: 2003 FED Share: GA Share:
UNDERWAY
$338,000 $270,400 $67,600
PROJECT: 210870- TYPE WORK: LIGHTING
FUND:NHS
LENGTH (miles I km) . 0.24/0.39
DESCRPT: 1-20 AT EXIT 46/SR 142 -- LIGHTING
LUMPSUM PROjECT
PE: 1997 ROW: NONE CST: 2003 FED Share: GA Share:
'UNDERWAY
$266,000 $212,800
$53,200
PROJECT: 210880- TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles I km)
I 11.61
DESCRPT: 1-20 SAFETY UPGRADES @ 2 LOCINEWTON & I LOC/WALTON
ASSOCIATED PROJECTS: 21088X-
PE: 1997 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$8,663,000 $7,796,700
$866,300
PROJECT: 231210- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 4 16.44
DESCRPT: SR I 621SALEM RD FM BROWN BRDGE RD TO S/FLAT SHOALSIROCKDALE
EXIST. LANES: 02 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 23121 X-
PE: 1999 ROW: 2001 CST:
UNDERWAY $600,000
AFTER 2003
Page 259 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _ _ _._.
9/21/00
..*
.._. ,._ ....., > ' < ' _ ' " _..O'<...._
..... . . . , . . , . ,. . . . . _ _ ... _ _ - . .. . _ _ ' " -"':,.~
,_.""":_,......-~,,:~
~
..........._ ,
_
NEWTON COUNTY
PROJECT: 231220- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 1.07/1.72
DESCRPT: SR 142 FM S OF SR 12/US 278 NORTH TO N OF CR 75 IN COVINGTON
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 210530-
PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $293,000
$3,750,000 $3,000,000
$750,000
PROJECT: 231625- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 1.8/2.90
DESCRPT: SR 81 PASSING LANE SW OF PORTERDALE FM MP 3.4 TO MP 5.2
EXIST. LANES: 02 PROpOSED LANES: 04
PE: 1999 ROW: 2001 CST:
UNDERWAY $100,000
AFTER 2003
PROJECT: 231630- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 12/US 278 FM JUST E OF MILL ST E TO SR 142/S-774 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 231635-
FUND: STP 3.45 /5.55
PE: 1998 ROW: 2003 CST:
UNDERWAY $367,000
AFTER 2003
PROJECT: 231690- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 3.3 /5.31
DESCRPT: SR 36 @ 3 LOCATIONS BETWEEN BUTTS COUNTY LINE AND CR 188
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1999 ROW: 2001 CST: 2003 FED Share: GA Shure:
UNDERWAY $28,000
$3,810,000 $3,048,000
$762,000
PROJECT: 232330- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.8 /1.29
DESCRPT: SR 36 AT FLAT SHOALS/STEELE RD/CR 18/ & HENDERSON MILLlCR506
LUMP SUM PROJECT
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$341,000 $306,900 $34,100
PROJECT: 242230- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 142 FM 1-20 TO ALCOVY RD IN COVINGTON EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 1.21 /1.95
PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $100,000
$3,996,000 $3,196,800
$799,200
PROJECT: 245190- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.56/0.90
DESCRPT: SR 212 @CR 191N OAK HILL-INTERSECTION IMPROVEMENTS
PE: 2000 ROW: 2003 CST:
UNDERWAY $304,000
AFTER 2003
PROJECT: 245380- TYPE WORK: REPLACE BRIDGE' LENGTH (miles / km)
DESCRPT: SR 20@ SOUTH RIVER NEWTON-HENRY CO LINE
ASSOCIATED PROJECTS: 24538X-
FUND: BRIDGE
PE: 2001
0.27/0.43
ROW: 2002
CST: 2003
FED Share:
GA Share:
$32,000 $10,000 $1,374,000 $1,099,200 $274,800
Page 260 of336
"'~--_""'
STATE TRANSPORTATIONIMPROVEMENT PROGRAM
9/21/00
t<IlI"l\:t _ _,_~~"_,,,,,,,,~_~,,_,,,,,~_,,,,,,,,,,,,,,,,,,,,,,.,,,,,_,,,,,,,,,,,,,,1I"W'_'_"""_""'
. _...'
,~_...__ .....,....,.:..._,r.<. t, ~ . . . . "._.~~..,,..~.,
NEWTON COUNTY
PROJECT: 271304- TYPE WORK: LANDSCAPING LENGTH(miles / km)
DESCRPT: STREETSCAPES IN THE CITY OF COVINGTON-PHASE I
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$959,000 $767,000
OTH Share:
PROJECT: 33317X- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0/0.00
DESCRPT: SR 36 @ SOUTH RIVER AT BUTTS-NEWTON CO L1NEIS~E B,UITS 333172
PE:NONE ROW: NONE CST: NONE
$192;000
ASSOCIATED PROJECTS: 333172-
; \-
j . ,"
~
I 'I
Page 261 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
__)
---"--------_._ -_._--_.-_. .- ... 9/21/00 . ~,-~-_.----".
-------"
OCONEE COUNTY
PROJECT: 0000169 TYPE WORK: LANDSCAPING
ATHENS TIP #
LENGTH (miles I km)
DESCRPT: US 441/SR 53 INTERCHANGE LANDSCAPING
FUND: STP
0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$75,000 $60,000
OTH Share:
PROJECT: 122660- TYPE WORK: WIDENING
FUND: STATE
ATHENS TIP # 11-05(2)
LENGTH (miles I km), 8.74/14.07
DESCRPT: SR 24/US 44 I FM N OF APALACHEE RIVER TO WATKINSVILLE BP
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1994 ROW: 2003 CST:
$15,000
UNDERWAY $3,664,000 AFTER 2003
PROJECT: 142060- TYPE WORK: WIDENING
FUND: STP
ATHENS TIP # 11-05
LENGTH (miles / km) 1.8512.98
DESCRPT: SR 53 FM HOG MTN RD (CR 274) TO SR I5/US 441 IN WATKINSVILLE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 141980-
PE: 1998 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $1,100,000 $3,500,000 $2,800,000
$700,000
PROJECT: 170543- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.2 /0.32
ROW: LOCL
DESCRPT: CR 121/HALE ROAD@GREENBRIARCREEK 4.5 MI SE OF FARMINGTON
CST: 2002
FED Share:
GA Share:
UNDERWAY
$393,000 $314,400 $78,600
PROJECT: 171460- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATHENS TIP # V-02
LENGTH (miles I km) 2.5/4.03
DESCRPT: SIMONTON BRIDGE ROAD FM WATKINSVILLE TO CLARKE COUNTY
ASSOCIATED PROJECTS: 141970-
PROJECT: 171574- TYPE WORK: SIDEWALKS
FUND: STP
ATHENSTlP#V-05
LENGTH (mi/eslkm) 4.9/7.89
DESCRPT: STREETSCAPES FOR BUTLER'S CROSSING IN WATKINSVILLE
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PE: 2003 ROW: LOCL CST: 2003 FED Share:
PROJECT: 245130- TYPE WORK: REPLACE BRIDGE
FUND: STP
LENGTH (miles / km) 0.43 10.69
DESCRPT: SR 15 @ ROSE CREEK BETWEEN GREENSBORO & WATKINSVILLE
OTH Share:
PE: 1997 ROW: 2001 CST:
$394,000 $315,000
$79,000
$23,000
$227,000 $182,000
$45,000
UNDERWAY $50,000
AFTER 2003
Page 262 of336
STATE TRANSPORTAT.ION IMPROVEM, ENT PROGRAM
_ _ _ _ _ _ _ _ _._._._ _,
"_'_00 _.
9/21/00
. _ ,_ . _
~
. _.,_
_ _..,
,
OGLETHORPE COUNTY
PROJECT: 222460- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 10 FM 10.2-12.2113.7-15.0115.3-16.2IWILKES: 0-1.715.5-7.q EXIST. LANES: 02 PROPOSED LANES: 03
FUND: STP 7.4 / I 1.91
PE: 1997 ROW: 2001 CST: .
UNDERWAY $100,000
AFTER 2003
PROJECT: 231910- TYPE WORK: NEW CONSTRUCTION
FUND: STP ..
LENGTH (miles / km) 6.3 /10. 14
DESCRPT: CRA WFORDILEXINGTON BYP FM E OF CR 26/SMOKEY RD SE TO SR 22
EXIST. LANES: 00 PROPOSED LANES: 04
PE: 1999 ROW: 2003 CST:
UNDERWAY $1,459,000 AFTE;R 2003
PROJECT: 232315- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.2 I /0.34
DESCRPT: SR 77@GOOSEPONDCREEK 14.5 MI NE OF LEXINGTON
PE: 1999 ROW: 2003
CST~
UNDERWAY $10,000
AFTER 2003
PROJECT: 245370- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 22 @ LONG CREEK 3.5 MI S OF LEXINGTON
FUND: BRIDGE 0.23 /0.37
PE:1999, ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 245371- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
.. LENGTH (miles / km). 0.23 /0.37
DESCRPT: SR 22 @ BIG CLOUDS CREEK 3.8 MI E OF SMlTHSONIA
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 245372- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
. LENGTH (miles / km) 0.24/0.39
DESCRPT: .SR 22 @ SOUTH FORK BROAD RIVER.4 MI NE 9F SMlTHSONIA
PE: 1999 , ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page 263 of336
---------_._--_.
- - - _.._----------_._._---
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
PAULDING COUNTY
PROJECT: 621570- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 61 FM SR 120 CONN TO SR 6/DALLAS BYPASS EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 641830-
FUND: NHS 3.2 15.15
PE: 1996 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $3,500,000 $8,000,000 $6,400,000 $1,600,000
PROJECT: 631142- TYPE WORK: MINOR WIDEN & RESURF LENGTH (miles I km)
FUND: STP 10 00
DESCRPT: CR 440lCR 470lCR 441 FM CR 168 TO CR 226/PAULDING ..SEE POLK
ASSOCIATED PROJECTS: 631148-
PE:NONE ROW: NONE . CST: NONE
PROJECT: 632660- TYPE WORK: REPLACE BRIDGE LENGTH (mileslkm)
DESCRPT: SR 120 OVER LANE CREEK 2.3 MI SW OF DALLAS
FUND: BRIDGE
PE:1997
0.42/0.68
ROW: 2000
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY
$413,000 $330,400
$82,600
PROJECT: 632776- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles I km)
DESCRPT: SR 92 AT CR 283/BROWNSVILLE ROAD LUMP SUM PROJECT
FUND: STP 0.54/0.87
PE: 1999 ROW: 2001 CST: 2001 FED Share: GA Share:
UNDERWAY $170,000 $403,000 $362,700 $40,300
PROJECT: 64Y830- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles I km) 0.29 10.47
DESCRPT: SR 61 FM CR 341 TO SR 6/DALLAS BYP & RR BR{FOR 31A $}/641830
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 641830-
PE: 1993 ROW: 2001 CST:
UNDERWAY $100,000
AFTER 2003
PROJECT: 670366- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles I km) 0.23/0.37
ROW: LOCL
DESCRPT: CR 842/0LD HARRIS ROAD@SOUTHERN RR (719808G) SE OF DALLAS
CST: 2003
FED Share:
GA Share:
OTH Share:
. UNDERWAY
$929,000 $743,200
$92,800 $93,000
.!:-
Page 264 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00.
PEACH COUNTY
PROJECT: 0000128 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles I km)
FUND: STP 0/0.00
DESCRPT: BYRON RAILROAD DEPOT MUSEUM/RAILROAD CABOOSE & CITY PARK
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000757 TYPE WORK: BARRIERS
WARNER ROBINS TIP # 2000( I)
LENGTH (miles I km)
DESCRPT: RICHARD RUSSELL PKWY NOISE BARRIERS
OTH Share:
FUND: STATE 0/0.00
PE: 1995 ROW: LOCL CST: 2001
GA Share:
$120,000 $96,000 $24,000
UNDERWAY $1,000,000
$1,000,000
PROJECT: 3 11540- TYPE WORK: INTERCHANGE
WARNER ROBINS TIP # WR 1-I 993( I)
LEN(iTH (miles I km)
DESCRPT: 1-75 @ SR 96
EXIST. LANES: 02 PROPOSED LANES: 04
. FUND: 1M I 11.61
PE: 1993 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY $4,444,000
$3,999,600 $444,400
PROJECT: 311700- TYPE WORK: INTERCHANGE
WARNER ROBINS TIP # WRI-1996(3)
LENGTH (mileslkm)
DESCRPT: 1-75 AT THE PROPOSED RICHARD RUSSELL PARK WAY
: EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 363760-
FUND:NHS 0.2/0.32
, '.
PE: 1995 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$3,900,000 $3,120,000
$780,000
PROJECT: 36313X- TYPE WORK: WIDENING LENGTH (miles I km)
FUND: ST.ATE 0 10.00
DESCRPT: SR 96 FM E OF FLINT RIV TO FT VALLEY BY/SR 49C & BRID/CRA WFD
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 363130-
PE:NONE ROW: NONE CST: NONE
c PROJECT: 363760- TYPE WORK: ,NEW CONSTRUCTION
FUND: STATE
WARNER ROBINS TIP # WR 1-1996(2)
LENGTH (miles I km) 5 18.05
DESCRPT: RICHARD RUSSELL PKWY FM E OF 1-75 TO CORDER RD/HOUSTON
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 36376X- 311700-
PE: 1995 ROW: LOCL CST: 2001
GA Share:'
UNDERWAY $11,843,000 $11,843,000
PROJECT: 363790- TYPE WORK: NEW CONSTRUCTION
FUND: STATE
LENGTH (miles I km) 0.55 10.89
DESCRPT: SR 894/UNIVERSITY BLVD FM 5R 49 TO ST COLLEGE DR-FT VALLEY
EXIST. LANES: 00 PROPOSED LANES: 02 .
PE:NONE ROW: 1997 CST: 2001
GA Share:
UNDERWAY $791,000
$791,000
PROJECT: 363820- TYPE WORK: WIDENING
FUND: STATE
LENGTH (mileslkm) 4.87/7.84
DESCRPT: SR 49C1FT VALLEY BYP FM BEVERLY RD NE TO SR 49 - ADD 2 LANES
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 2001 CST:
UNDERWAY $10,000
AFTER 2003
Page 265 of336
STATE TRA/ySPORTATION IMPROVEMENT PROGRAM
9/21/00
PEACH COUNTY
PROJECT: 363910- TYPE WORK: REALIGNMENT
FUND: NHS
LENGTH (miles / km) . 1.2/1.93
DESCRPT: 1-75 @SR49RELOCATE FRONTAGE RDS CHAPMAN RD & INDUST BLVD
PE: 2001 ROW: CST:
$151,000 AFTER 2003 AFTER 2003
Page 266 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
PICKENS COUNTY
PROJECT: 0000142 TYPE WORK: RICiHTS-OF-WAY LENGTH (miles / km)
FUND: STP 0 /0.00
DESCRPT: BURNT MOUNTAIN SCENIC PRESERVATION PR9PERTY ACQUISITION
PE:LOCL ROW: 2001 CST: NONE
$938,000
PROJECT: 621490- TYPE WORK: WIDENING LENGTH (miles / km)
.DESCRPT: SR 53 FM SR 515/APD TO CR 243/1NDUSTRIAL BLVD EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 1.4.12.25
PE: 1992 ROW: 2003 CST:
UNDERWAY $1,200,000 AFTER 2003
PROJECT: 621590- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 2.36/3.80
DESCRPT: SR 53 - WB PASSING LNS EAST OF TATE MP 20.4-21.3 & 22.6-24.1
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 2000 ROW: 2001 CST: 2001 FED Share: GA Share:
UNDERWAY $0
$1,633,000 $1,306,400
$326,600
PROJECT: 621595- TYPE WORK: PASSING LANES
FUND: STP
LENfiTlI (miles / km) 2.94/4.73
DESCRPT: SR 53 - EB PASSING LNS EAST OF TATE MP 24.3-25.4 & 26.5-28.4
EXIST. LANES: 02 PROPOSED LANES: 03
PE:2000 ROW: 2002 CST:
UNDERWAY $175,000
AFTER 2003
PROJECT: 642140- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles / km) 0.2 /0.32
ROW: 2001
DESCRPT: SR 136 BRlDGE REPLACEMENT OVER TALKING ROCK CREEK N OF SR 53
CST: 2002
FED Share:
GA Share:
UNDERWAY $14,000
$466,000 $372,800
$93,200
Page 267 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
. PIERCE COUNTY
PROJECT: 0001115 TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: CR 191/BOWEN RD IN BLACKSHEAR@CSX# 637256R LUMP SUM PROJECT
FUND: STP 0/0.00
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$100,000 $80,000 $20,000
PROJECT: 522340- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 6.9/1 1.11
DESCRPT: SR 38/US 84 FM CR I07/0FFERMAN TO S CITY LMTS SCREVEN/WAYNE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 52234X-
PE: 1993 ROW: 2001 CST:
UNDERWAY $1,667,000 AFTER 2003
PROJECT: 533 170- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.26/0.42
DESCRPT: SR 15 @ BIG SATILLA CREEK AT APPLING COUNTY LINE
ASSOCIATED PROJECTS: 533 I7X-
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 542370- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.4 /0.64
DESCRPT: SR 203/STRICKLAND STREET AT OLD ALMA ROAD/CR 309
PE: 2001 ROW: CST:
$10,000 AFTER 2003 AFTER 2003
(
Page 268 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9121100
PIKE COUNTY
PROJECT: 333110- TYPE WORK: INTERSECTION IMPROVEMENT
.
LENGTH (miles / km)
DESCRPT: SR 18/SR 109 AND SR 74 INTERSECTION IMPROVEMENT
FUND: STP 0.2/0.32
PE: 2000 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY
$547,000
~
$605,000
$484,000
$121,000
PROJECT: 333145- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 18 @ ELKINS CREEK .1 MI W OF ZEBULON
FUND: BRIDGE 0.24/0.39
PE: 1999 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 343385- TYPE WORK: REPLACE BRIDGE
I
LENGTH (miles / km)
DESCRPT: SR 109 @ ELKINS CREEK .5 MI E OF MOLENA
FUND: BRIDGE 0.24/0.39
PE: 1999 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
Page 269 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
POLK COUNTY
PROJECT: 0000115 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: DEPOT/HISTORIC DISTRICT OF CEDARTOWN
FUND:STP 0/0.00
PE:LOCL ROW: LOCL . CST: 2001 FED Share:
PROJECT: 0000116 TYPE WORK: SIDEWALKS LENGTH (miles / km)
DESCRPT: ROCKMART STREETSCAPE PROJECT
FUND: STP 0/0.00
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 620645- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 6.27/ 10.09
DESCRPT: SR 6 FM OLD CEDARTOWN RD/CR 193 E TO SR IOIlROCKMART/62Y645
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 62Y645-
OTH Share:
PE: 1992 ROW: 1997 CST: 2003 FED Shure: GA Share:
$655,000 $524,000
$131,000
$310,000 $248,000
$62,000 UNDERWAY UNDERWAY
$5,017,000 $4,013,600 $1,003,400
PROJECT: 62I43X- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: SR 113 FM TAYLORSVILLE CL TO CR 31/STILESBORO..SEE BARTOW
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 621430-
PE:NONE ROW: NONE CST: NONE
PROJECT: 621860- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles/ km) 5.75/9.26
DESCRPT: CEDARTOWN BYPASS WIDENING FM SR 100 N TO JUST S. OF CR 334
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 62Y860-
PE: 1995 ROW: 2001 CST:
UNDERWAY $845,000
AFTER 2003
PROJECT: 62Y645- TYPE WORK: WIDENING
FUND: HPP
LENGTH (miles / km) 6.27 / 10.09
DESCRPT: SR 6 FM OLD CR 193 E TO SR 101 - FOR HPP $ SEE 620645
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 620645-
PE: 1992 ROW: NONE CST: 2003 FED Share: GA Shure:
UNDERWAY
$4,490,000 $3,592,000
$898,000
PROJECT: 631148- TYPE WORK: MINOR WIDEN & RESURF
FUND: STP
LENGTH (miles / km) 6.53 / 10.51
DESCRPT: CR 440/470/441 FM CR 168 THRU PAULDING TO CR 226/0LD ATL HWY
ASSOCIATED PROJECTS: 631142-
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $129,000
$3,099,000 $2,479,200
$619,800
PROJECT: 63114X- TYPE WORK: MINOR WIDEN & RESURF
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: CR 342/CR 440 FM CR 345/HARALSON TO CR I68/POLK-SEE HARALSON
ASSOCIATED PROJECTS: 631145-
PE:NONE ROW: NONE CST: NONE
Page 270 of336
STATE TRANSPORTATION IMPROVEMENT PRo,GRAM
9/21/00
POLK COUNTY
PROJECT: 641880~ TYPE WORK: TURN LANES LENGTH (miles / km)
DESCRPT: SR I BUSFM THORNTON AVE TO CEDARTOWN BYPASS
FUND: NHS 1.08/1.74
PE: 1994 ROW: 1999 CST: 2001 FED Share:
UNDERWAY UNDERWAY $1,271,000 $1,271,000
PROJECT: 670678- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE:2001
.. L.ENGTH (miles / km) 0.2 /0.32
ROW: LOCL
DESCRPT: CR 182/BETHLEHEM ROAD@FISH CREEK 5.7 MI W OF ROCKMART
CST: 2003
FEDShllre:
GA Share:
$19,000
$191,000 .$152,800
$38,200
.".
Page 2710/336 )
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
PULASKI COUNTY
PROJECT: 322180- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 9.5 /15.30
DESCRPT: SR 27/US 341 FM SR 230/HAWKINSVILLE E TO DODGE CO LINE
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 1994 CST: 2001
GA Share:
UNDERWAY UNDERWAY $18,670,000
$18,670,000
PROJECT: 333080- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 257 @ TEN MILE CREEK 3.5 MI NW OF FINLEYSON
FUND: BRIDGE
PE: 1999
0.22/0.35
ROW: 2001
CST: 2003
FED Share:
,GA Share:
UNDERWAY $10,000
$330,000 $264,000
$66,000
PROJECT: 343000- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.26 /0.42
DESCRPT: SR 230 @ BIG CREEK 5.6 MILES WEST OF HAWKINSVILLE
PE: 1995 ROW: 2001 CST:
UNDERWAY $50,000
AFTER 2003
Page 272 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
PUTNAM COUNTY
PROJECT: 0001077 TYPE WORK:' . INTERSECTION IMPROVEMENT
FUND: MIN. GUARAN PE: 2001
LENGTH (miles 1 km) 0.53/0.85
ROW: 2003
DESCRPT: SR 16 FM JEFFERSON AVE TO EAST OF S. GRAND AVE IN EATONTON
CST:
$49,000 $168,000 AFTER 2003
PROJECT: 222470- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 10.4 116.66
DESCRPT: SR 24/US 441 FM CR 245 TO EATONTON BYPASS @ US 129
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 22Y470-
PROJECT: 222580- TYPE WORK: WIDENING
FUND: STATE
.
LENGTH (miles 1 km) 9.04/14.55
DESCRPT:SR 24/US 441 FM EATONTON BP@CR 17/REIDS RD TO MORGAN CL
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 2003 CST:
UNDERWAY $2,489,000 AFTER 2003
PE: 1994 ROW: 2003 CST:
UNDERWAY $4,809,000 AFTER 2003
PROJECT: 231270- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles 1 km) 0.31 10.50
DESCRPT: SR 16 OVER THE OCONEE RIVER @ HANCOCK COUNTY LINE
PE: 1997' ROW: 2001 CST:
UNDERWAY $50,000
AFTER 2003
PROJECT: 23 1610- TYPE WORK: WIDENING
FUND: STP
LENGTH (mileslkm) 5.14/8.28
DESCRPT: SR 24/EATONTON BYPASS- REMAINING TWO LANES NORTHBOUND
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 1999 CST: 2003 FED Share: GA Share:
UNDERWAY UNDERWAY ~ $2,426,000 $1,940,800
$485,200
PROJECT: 231620- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles 1km) 5.07 18.16
DESCRPT: SR 44 FOUR PASSING LANES NB & SB BETWEEN EATONTON & GRAY
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1998 ROW: 2001 CST:
UNDERWAY $100,000
AFTER 2003
PROJECT: 232295- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles 1km) 0.22/0.35
DESCRPT: SR 16@ ROOTY CREEK IN EAST EATONTON
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 245350- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 16 @ CROOKED CREEK 6 MI E OF EATONTON
FUND: BRIDGE
PE: 1999
0.22/0.35
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY , $10,000
$639,000 $511,200 $127,800
Page 273 of336
STATE TRANSPORTATION IMpJUivEMENT PROGRAM
9/21/00
PUTNAM COUNTY
PROJECT: 270760- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: CR 212/FH 24 SOUTH OF SR 24 @TOWN CREEK
FUND: BRIDGE
PE: 1996
0.4 /0.64
ROW: LOCL
CST: 2002
FED Share:
GAShare:
UNDERWAY
$515,000 $412,000 $103,000
PROJECT: 271130- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: MARTIN MILL RD/eR 29/FH 27 @ LITTLE RIVER
FUND: FOREST HWY PE: 1996
0.79/1.27
ROW: LOCL
CST: 200 I
FED Share:
UNDERWAY
$1,404,000 $1,404,000
Page 274 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
QUITMAN COUNTY
PROJECT: 431520- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.38/0.61
DESCRPT: SR SO/US 82 REALIGNMENT IN THE CITY OF GEORGETOWN
PE: 1996 ROW: 1998 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$2,000,000 $1,800,000
$200,000
. Page 275 of336
STATE TRANSPORTATION IMpROVEMENT PROGRAM
9/21/00
RABUN COUNTY
PROJECT: 0000306 TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 28 @ CHATIOOGA RIVER 13 MI NE OF CLA YTON
FUND: BRIDGE 0.24 10.39
PE: 2001 ROW: CST:
$66,000 AFTER 2003 AFTER 2003
PROJECT: 121950- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (mileslkm) 2.32/3.74
DESCRPT: SR 2 FM LAKE BURTON BRIDGE TO CHARLIE MTN RD/CR 94 & REALIGN
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1993 ROW: 1996 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY $8,444,000 $6,755,200 $1,688,800
PROJECT: 122320- TYPE WORK: WIDENING
FUND:NHS
LENGTH (mileslkm) 9.76/15.71
DESCRPT: SR 15IUS 441 FM N OF TALLULAH FALLS TO S CL OF CLAYTON
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 12Y320-
PE: 1993 ROW: 2002 CST:
UNDERWAY $19,863,000 AFTER 2003
PROJECT: 12Y090- TYPE WORK: WIDENING
FUND:NHS
LENGTH (miles 1 km) 0/0.00
DESCRPT: SR 15/US 441 FM NO. CUCLA YTON TO NC LINE-FOR FED PEII 22090
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 122090-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 171580- TYPE WORK: . REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: CR 80 AT TALLULAH RIVER 6.6 MI SW OF TIGER
FUND: BRIDGE
PE: 2000
0.22/0.35
ROW: LOCL .
CST: 2003
FED Share:
GA Share:
UNDERWAY
$547,000 $437,600 $109,400
" Page 276 0/336
;----------~~~~~~---- -- - --------------~~- - - - - - - - - - - - - - - - - - - - ~ -
STATE TRANSPORTATIONIMPROVEMENTPROGRAM
9/21/00
RANDOLPH COUNTY
PROJECT: 422235- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 7.81 112.57
DESCRPT: SR IFM CARNEGIE VILULAH RD/CR 153 TO CUTHBERT BYPASS
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 431530- 42Y235-
PE: 1995 ROW: 2003 CST:
UNDERWAY $922,000
AFTER 2003
PROJECT: 42223X- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 0/0.00
DESCRPT: SR I FM BLUFFTON BYP TO CARNEGIE VILULAH RD/CR 153 - 422230
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 422230-
PE."NONE ROW: NONE CST: NONE
PROJECT: 422240- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 8.5/13.69
DESCRPT: SR IIUS 27 FR CUTHBERT BYP TO CR 116/LUSCIOUS QUEEN ROAD
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 1999 CST: 2003
GA Share:
UNDERWAY UNDERWAY $21,020,000
$21,020,09
PROJECT: 422245- TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR IIUS 27 FR CR 116 TO LUMPI\IN BYPASS/& STEWART EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 42224X-
FUND: STATE 7.78 1 12.53
PE: 1996 ROW: 1999 CST: 2003
GA Share:
UNDERWAY UNDERWAY $19,840,000
$19,840,000
PROJECT: 431530- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
LENGTH (miles 1 km) 0.21 10.34
ROW: NONE
,DESCRPT: SR IIUS 27@ GEORGIA/ALABAMA RR 2.2 MI S. OF CUTHBERT
CST: 2002
FED Share:
ASSOCIATED PROJECTS: 422235-
GA Share:
UNDERWAY
~
$631,000 $504,800 $126,200
PROJECT: 432095- TYPE WORK: REPLACE BRIDGE
.
LENGTH (miles 1 km)
DESCRPT: SR 50/US 82 @ PACHITLA CREEK 4 MI E OF CUTHBERT
FUND: BRIDGE 0.21/0.34
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 442955- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 216 @CARTER CREEK 4.6 MI S OF CUTHBERT
FUND: BRIDGE 0.22/0.35
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: M000337 TYPE WORK: SHOULDER WORK LENGTH (miles / km)
DESCRPT: SR 266 FM CLAY CO LN TO SR 50 LUMP SUM PROJECT
FUND: STP 11.2 118.06
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$657,000
$525,600
..
$131,400
Page 277 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
- - _ .__. _ - - - - - _ _ _ _... .... =_.".,"'''',._*~_..._.
_._.~
:_ _ ...... >_><n,..._.,~,....,....'''''''_.,.._".,,.,;'',.'...-...._
_
MORGAN COUNTY
PROJECT: 0000472 TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles / km) . 0.6/0.97
DESCRPT: 1-20 SAFETY UPGRADES @ SR 24; BUCKHEAD RD & SR 44/GREENE; X
ASSOCIATED PROJECTS: 00004X2
PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$11,400,000 $10,260,000
$1,140,000
PROJECT: 0001222 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.36/0.58
DESCRPT: SR 24/ATHENS HIGHWAY @ HARD LABOR CREEK & BIG SANDY CREEK
PE: 2002 ROW: CST:
$120,000 AFTER 2003 AFTER 2003
PROJECT: 210920- TYPE WORK: INTERCHANGE LENGTH (miles I km)
DESCRPT: 1-20 SAFETY UPGRADES @ NEWBORN RD AND SR 83
FUND: 1M 0.4 /0.64
PE: 1998 ROW: NONE CST: 2001 FED Share: GA SIMre:
UNDERWAY
$7,600,000 $6,840,000
$760,000
PROJECT: 245285- TYPE WORK: REPLACE BRIDGE.
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.21 /0.34
ROW: LOCL
DESCRPT: CR 251/SEVEN ISLAND ROAD @ SUGAR CREEK 1.8 MI S OF BUCKHEAD
CST: 2001
FED Share:
GA Share:
UNDERWAY
$568,000 $454,400 $113,600
Page 252 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
MURRA Y COUNTY
PROJECT: 0000687 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.22/0.35
DESCRPT: CR 4IDENNIS MILL ROAD@ ROCK CREEK 5.6 MI SE OF CHATSWORTH
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 620399- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 52 @ CSX RR IN CHATSWORTH
FUND: BRIDGE
PE: 1996
0.17 /0.27
ROW: 1996
CST: 2001.
FED Share:
GA Share:
UNDERWAY UNDERWAY
$1,732,000 $1,385,600
$346,400
PROJECT: 621260- TYPE WORK: REALIGNMENT LENGTH (miles / km)
DESCRPT: SR 282 RELOCATION FM SR 61IUS 411 E TO CR 309 EXIST. LANES: 00 PROPOSED LANES: 02
FUND: STP 1.2 / 1.93
PE: 1992 ROW: 2002 CST:
UNDERWAY $51,000
AFTER 2003
PROJECT: 631550- TYPE WORK: WIDENING
FUND: STP
.LENGTH (miles / km) 4 /6.44
DESCRPT: SR 225/SPRING PLACE BYP - NEW HOPE RD TO SR 225 S OF MILL CK
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 2002 CST:
UNDERWAY . $2,856,000 AFTER 2003
PROJECT: 642370- TYPE WORK: BRIDGES
FUND: STP
LENGTH (miles / km) 0.15 /0.24
DESCRPT: CR 19!OLD FEDERAL ROAD GRADE SEPARA T!ON AT CSX RAILROAD
PE: 2000 ROW: LOCL CST: 2002 FED Share: GA Share:
. UNDERWAY
$800,000 $720,000
$80,000
PROJECT: 642410- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 282 @ ROCK CREEK 5.3 MI S OF CHATSWORTH
FUND: BRlDGE 0.22/0.35
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 671212- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: MURRAY COUNTY BIKE LANES PHASE I
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 671230- TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles / km) 0.23/0.37
DESCRPT: RELOCATE CR 231 CONSTRUCT A CANOEIKAYAK RAMP & PARKING AREA
PE:2001 ROW: 2003 CST: 2003 FED Share: GA Share:
$233,000 $186,000
$47,000
$50,000 $10,000 $527,000 $421,600 $105,400
Page 253 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
MUSCOGEE COUNTY
PROJECT: 0000099 TYPE WORK: 'BICYCLE/PED. FACILITY
COLUMBUS TMA TIP # WSTRIAL-2000
LENGTH (miles I km)
DESCRPT: WARM SPRINGS RAIL LINE BIKE/PED TRAIL
FUND: STP 12/19.32
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 0000342 TYPE WORK: MINOR WIDEN & RESURF
FUND: NHS
COLUMBUS TMA TIP #
LENGTH (miles I km) 1.31 /2.11
DESCRPT: MACON RD/SR 22SP FM UNIVERSITY AVE/CS 959 TO REESE RD/CS2111
PE: 2001 ROW: CST:
$1,250,000 $1,000,000
$250,000
$100,000 AFTER 2003 AFTER 2003
PROJECT: 0000343 TYPE WORK: INTERSECTION IMPROVEMENT
COLUMBUS TMA TIP # ST-LR-32
LENGTH (miles I km)
DESCRPT: RIVER RD/SR 219 AT 54TH STREET/CS 1425 IN COLUMBUS
FUND: STP 0/0.00
PE: 2001 ROW: CST:
$10,000 AFTER 2003 AFTER 2003
PROJECT: 311445- TYPE WORK: WIDENING
FUND:NHS
PE: 1992
UNDERWAY
COLUMBUS TMA TIP # 91-ST-2001
LENGTH (miles I km) 2.8314.56
ROW: 2001
$319,000
DESCRPT: I-I 85/COLUMBUS FM SR 520 TO ST MARYS ROAD
CST: 2003
$13,966,000 .
EXIST. LANES: 04 PROPOSED LANES: 06
FED Share:
$11,172,800
ASSOCIA TED PROJECTS: 3 I 1630-
0.
GA Share:
$2,793,200
PROJECT: 311630- TYPE WORK: INTERCHANGE
COLUMBUSTMA TIP # 91-ST-2001
LENGTH (miles I km)
DESCRPT: 1-185 INTERCHANGE AT SR I/SR 520
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 311445-
FUND: 1M 1.61/2.59
PE: 1994 ROW: 2001 CST:
UNDERWAY $2,107,000 AFTER 2003
PROJECT: 321810- TYPE WORK: BRIDGE REHAB
FUND:NHS
COLUMBUS TMA TIP # 86-UD-3001
LENGTH (miles / km) 0.691 L11
DESCRPT: SR I1US 27/4TH AVENETERANS PKWY FM 13TH ST TO 19TH ST
EXIST. LANES: 04 PROPOSED LANES: 06
PE: 1992 ROW: 1998 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY $5,454,000 $4,363,200 $1,090,800
PROJECT: 323005- TYPE WORK: ATMSIITS
FUND:NHS
COLUMBUS TMA TIP # ST-LR-25
LENGTH (miles I km) 0 10.00
DESCRPT: ATMSI COLUMBUS/MUSCOGEE COUNTY/GDOT REGIONAL TCC
PE:NONE ROW: NONE CST: 2002 FED Share: GA Share:
$1,000,000 $800,000 $200,000
PROJECT: 332820- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP # 98-SR-0 I
LENGTH (miles I km) 15.5 124.96
DESCRPT: SR INETERANS PWY FM OLD MOON RD TO FORTUNE HOLE RD/HARRIS
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 33282X-
PE: 1998 ROW: 2003 CST:
UNDERWAY $12,000,000 AFTER 2003
Page 254 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
MUSCOGEE COUNTY
PROJECT: 350690- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
PE: 1992
COLUMBUS TMA TIP # 86-SR-1 00 I
LENGTH (miles 1 km) 1.04/1.67
ROW: 1997
DESCRPT: SR 22 SPUR/MACON RD @ AUBURN AVE & BOXWOOD BLVD IN COLUMBUS
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY
$868,000 $694,400 $173,600
, PROJECT: 350730- TYPE WORK: WIDENING
FUND: STP
PE: 1993
COLUMBUS TMA TIP # 86-SR-2007
' LENGTH. (miles I km) 2.02/3.25
ROW: 1998
DESCRPT: TALBOTTON RD/SR 982/COLUMBUS FM 7TH AVE TO WOODRUFF/HILTON-Y
CST: 2002
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 35Y730-
GA Share:
. UNDERWAY UNDERWAY $10,3 I6,000 $8,252,800 $2,063,200
PROJECT: 350780- TYPE-WORK: WIDENING
FUND: STP
PE: 1992
COLUMBUS TMA TIP # 79-SR-2003
LENGTH (miles I km) . 2.14/3.45
ROW: 2001
DESCRPT: FOREST RD FM MACON{+MACON IMPROV} TO WOODRUFF FA/FLOYD RD-Y
CST: 2002 '
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 35Y780-
GA Share:
I
UNDERWAY $882,000
$6,073,000 $4,858,400 $1,214,600
PROJECT: 350785- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP # 79-SR-2016
LENGTH (miles 1 km) 1.9/3.06
DESCRPT: FORESTRD/SR 983 FM WOODRUFF FARM/FLOYD RD TO SCHATULGA &Y
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 35Y785-
PE: 1992 ROW: 2001 ' CST: 2002 ' FED Share: GA Share:
PROJECT: 350790- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP # 79-SR-2020
LENGTH (miles1 km) 0.91 I J.47
DESCRPT: ST MARYS RO/CS 2108/COLUMBUS FM BUENA VISTA TO ROBIN RD .
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY $1,000,000 $4,825,000 $3,860,000
$965,000
UNDERWAY
$1,939;000 $1,551,200
$387,800
PROJECT: 350870- TYPE WORK: WIDENING
FUND: NHS
COLUMBUS TMA TIP # 93-BR- I002
LENGTH (miles /ikm) 3.43 15.52
DESCRPT: SR 22 SP/MACON RD FM WOODRUFF FARM RD/CR 99 TO SR.22/US 80
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 350875-
PE: 1992 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$8,565,000 $6,852,000 $1,713,000
PROJECT: '350875- TYPE WORK: BRIDGE REHAB
COLUMBUS TMA TIP # 93-BR-IOOI
LENGTH (mileslkm)
DESCRPT: SR 22 SP/MACON RD @ BULL CREEK
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 350870-
FUND: BRIDGE
PE: 1992
0.02/0.03
ROW: NONE
CST: 2001
FED Share:
GA Share:
UNDERWAY
$4n,000 $376,800
$94,200
PROJECT: 350880- TYPE WORK: ,WIDENING
FUND: NHS
COLUMBUS TMA TIP # 92-SR-200 I
LENGTH (miles 1 km) 1.67 12.69
DESCRPT: MACON RD/SR 22SP FM REESE RD/CS2 I II TO WOODRUFF FRM RD/CR 99
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 1999 ' CST: 2001 . FED Share: GA Shure:
UNDERWAY UNDERWAY $4,081,000 $3,264,800
$816,200
Page 255 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
MUSCOGEE COUNTY
PROJECT: 350970- TYPE WORK: NEW CONSTRUCTION
FUND: STP
COLUMBUS TMA TIP # 98-SR-1660
LENGTH (miles I km) 2.1 13.38
DESCRPT: NEW ROAD/ MILLER TO BILLINGS RD & HOLLAND DR TO GATEWAY DR
EXIST. LANES: 00 PROPOSED LANES: 02
PE: 2001 . ROW: LOCL CST: 2002 FED Share: GA Share:
$5,000
$448,000 $358,400
$89,600
PROJECT: 351000- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
PE: 1996
COLUMBUS TMA TIP # 79-SR-2004
LENGTH (miles I km) 0.2/0.32
ROW: LOCL
DESCRPT: SR 22SP/MACON RD/WYNNTON AT BROWN AVENUE AND PEACOCK AVENUE
CST: 200 I
FED Share:
GA Share:
UNDERWAY
$587,000 $469,600 $1 17,400
PROJECT: 351010- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP #
LENGTH (miles I km) 0.67 I 1.08
DESCRPT: CS 1618/WHITTLESEY ROAD FROM WHITESVILLE RD TO VETERANS PKWY
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1998 ROW: LOCL CST: 2003 FED Share: GA Share:
UNDERWAY
$1,828,000 $1,462,400
$365,600
PROJECT: 351020- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP # 86-SR-2002
LENGTH (miles I km) 0.5 10.81
DESCRPT: CS'1425/54TH STREET FROM CHUMAR DR TO VETERANS PARKWAY
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1998 ' ROW: LOCL CST: 2002 FED Share: GA Share:
UNDERWAY
$685,000 $548,000 $137,000
PROJECT: 351190- TYPE WORK: WIDENING
COLUMBUS TMATIP # BV-2002
LENGTH (miles I km)
DESCRPT: BUENA VISTA ROAD FM 1-185 TO DOGWOOD DRIVE
EXIST. LANES: 05 PROPOSED LANES: 06
FUND: STP 0.41/0.66
PE: 2001 ROW: LOCL CST:
$\00,000
.-
AFTER 2003
PROJECT: 35Y780- TYPE WORK: WIDENING
FUND: STP
COLUMBUS TMA TIP # 79-SR-2003
LENGTH (miles I km) 0 10.00
DESCRPT: FORREST RD FM MACON RD TO WOODRUFF FARM RD- Q23 $ 350780
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 350780-
PE: 1992 ROW:200J CST: NONE
UNDERWAY $3,828,000
PROJECT: 35Y785- TYPE WORK: WIDENING
' FUND: STP
COLUMBUS TMA TIP # 79-SR-2016
LENGTH (miles Ikm) 0/0.00
DESCRPT: FORREST RD FM WOODRUFF FARMIFLOYD TO SCHATULGA-Q23 $; 350785
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 350785-
PE: 1992 ROW: 2001 CST: NONE
UNDERWAY $8,750,000
PROJECT: 371762- TYPE WORK: BICYCLE/PED. FACILITY
FUND:STP
COLUMBUS TMA TIP # 98-NRVRWLK
LENGTH (miles I km) 0/0.00
DESCRPT: RIVERWALK TRAIL ALONG CHATTAHOOCHEE RIVER PHASES 1&2
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
$2,500,0~0
$2,000,000
$500,000
Page 256 of336
---_._-- ._---
..._-_._--_._.._ . _ - - - - - _..__. _ - -
STATE TRANSPORTATION IMPROVEMENT PROGRAM'
9/21/00
MUSCOGEE COUNTY
PROJECT: 302005- TYPE WORK: CAPITAL
FUND: TRANSIT
PE:NONE
COLUMBUS TMA TIP #
LENGTH (miles / km) 0 /0.00
ROW: NONE
DESCRPT: TIRE LEASING; ENGINE REBUILD PROGRAM:.TRANSMISSION REBUILD
CST: 2001
FED Share:
GA Share:
OTH Share:
PROJECT: 302007- TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles/ km)
DESCRPT: TRANSIT CAPITAL ITEMS
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002.
FED Share:
GA Share:
OTHShare:
PROJECT: 302010- TYPE WORK: CAPITAL COLUMBUS TMA TIP # DESCRPT: TRANSIT COACHES
LENGTH (miles / km)
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
OTH Share:
PROJECT: 302011- TYPE WORK: CAPITAL COLUMBUS TMA TIP # DESCRPT: TRANSIT COACHES
LENGTH (miles / km)
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
OTH Share:
PROJECT: 3V7038- TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles / km)
DESCRPT: ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2001
FED Share:
GA Share:
$1,199,000 $1,066,000
$133,000 $133,000
$1,235,000 $1,098,000
$137,000 $137,000
$450,000 $400,000
$50,000 $50,000
$450,000 $400,000
$50,000
$50,000
~
$43,000 $43,000 $11,000
PROJECT: T000134 TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 COLUMBUS SECTION 5307 CAPITAL
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTH Share:
PROJECT: TOOOl35 TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles / km) .
DESCRPT:FY 2003 COLUMBUS SECTION 5309. CAPITAL
FUND: TRANSIT . PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Share:
OTHShare:
PROJECT: TOOOl36 TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles / km)
DESCRPT: FY 2003 COLUMBUS SECTION 5310 CAPITAL
FUND: TRANSIT
PE:NONE
0/0.00
ROW: NONE
CST: 2003
FED Share:
GA Shores
$4,046,000 $3,596,000
$450,000 $450,000
$450,000 $400,000
$50,000 $50,000
$47,000 $47,000 $12,000
Page 257 of336
__ .... ..._---------
_-_._ .. ..:--_......,
.. -'.---_.,---_.
STATE TRANSPORTATION IMPROVEMENT PROGRAM
.... .._-"",.,,...... ..__._ . ."'.. ...-.:"',..,.. ..._ - - ""'.,....,..~
~-----_
~~..-
~-_
9121100
----.,;--"'------;-~,.~,.-------_
MUSCOGEE COUNTY
PROJECT: T000226 TYPE WORK: CAPITAL
COLUMBUS TMA TIP #
LENGTH (miles / km)
DESCRPT: FY 2002 COLUMBUS SECTION 53 I0 CAPITAL
FUND: TRANSIT
PE: NONE
0/0.00
ROW: NONE
CST: 2002
FED Share:
GA Share:
$45,000 $45,000 $11,000
Page 258 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
NEWTON COUNTY
PROJECT: 0000168 TYPE WORK: SIDEWALKS LENGTH (miles I km)
DESCRPT: COVINGTON WEST STREET STREETSCAPE
FUND: STP 010.00
PE: LOCL ROW: LOCL .CST: 2001 .
FED Share:
PROJECT: 0000842 TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles I km)
DESCRPT: SR I 62/SALEM ROAD AT SPRING ROAD/CR 33 LUMP SUM PROJECT
FUND:STP 0.32/0.52
OTH Share:
PE: 2001 ROW: LOCL CST: 2003 FED Share: GA Share:
$164,000 $131,000
$33,000
$22,000
$328,000 $295,200
$32,800
PROJECT: 210530- TYPE WORK: INTERCHANGE
FUND: 1M
LNGTH(mileslkm) 0.71/1.14
DESCRPT: 1-20 @ SR 142-12/COVINGTON (INCL RELOC OF FRONTAGE RD/CR 72)
ASSOCIATED PROJECTS: 231220-
PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $5,250,000 $4,223,000 $3,800,700 $422,300
PROJECT: 210810- TYPE WORK: WIDENING
FUND:NHS
LENGTH (miles I km) 1.8212.93
DESCRPT: 1-20 FM ALCOVY ROAD INCL INTERCHANGE TO SR 142 IN COVINGTON
EXIST. LANES: 04 PROPOSED LANES: 06
PE:1998 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $110,000
$9,050,000 $7,240,000 $1,810,000
PROJECT: 210860- TYPE WORK: LIGHTING LENGTH ('~iles I km)
DESCRPT: 1-20 AT EXIT 45AJALCOVY ROAD -- Lk;HTING LUMP SUM PROJECT
FUND:NHS 0.48/0.77
PE: 1997 ROW: NONE CST: 2003 FED Share: GA Share:
UNDERWAY
$338,000 $270,400 $67,600
PROJECT: 210870- TYPE WORK: LIGHTING
FUND:NHS
LENGTH (miles I km) . 0.24/0.39
DESCRPT: 1-20 AT EXIT 46/SR 142 -- LIGHTING
LUMPSUM PROjECT
PE: 1997 ROW: NONE CST: 2003 FED Share: GA Share:
'UNDERWAY
$266,000 $212,800
$53,200
PROJECT: 210880- TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles I km)
I 11.61
DESCRPT: 1-20 SAFETY UPGRADES @ 2 LOCINEWTON & I LOC/WALTON
ASSOCIATED PROJECTS: 21088X-
PE: 1997 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$8,663,000 $7,796,700
$866,300
PROJECT: 231210- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 4 16.44
DESCRPT: SR I 621SALEM RD FM BROWN BRDGE RD TO S/FLAT SHOALSIROCKDALE
EXIST. LANES: 02 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 23121 X-
PE: 1999 ROW: 2001 CST:
UNDERWAY $600,000
AFTER 2003
Page 259 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_ _ _ _._.
9/21/00
..*
.._. ,._ ....., > ' < ' _ ' " _..O'<...._
..... . . . , . . , . ,. . . . . _ _ ... _ _ - . .. . _ _ ' " -"':,.~
,_.""":_,......-~,,:~
~
..........._ ,
_
NEWTON COUNTY
PROJECT: 231220- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 1.07/1.72
DESCRPT: SR 142 FM S OF SR 12/US 278 NORTH TO N OF CR 75 IN COVINGTON
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 210530-
PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $293,000
$3,750,000 $3,000,000
$750,000
PROJECT: 231625- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 1.8/2.90
DESCRPT: SR 81 PASSING LANE SW OF PORTERDALE FM MP 3.4 TO MP 5.2
EXIST. LANES: 02 PROpOSED LANES: 04
PE: 1999 ROW: 2001 CST:
UNDERWAY $100,000
AFTER 2003
PROJECT: 231630- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 12/US 278 FM JUST E OF MILL ST E TO SR 142/S-774 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 231635-
FUND: STP 3.45 /5.55
PE: 1998 ROW: 2003 CST:
UNDERWAY $367,000
AFTER 2003
PROJECT: 231690- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 3.3 /5.31
DESCRPT: SR 36 @ 3 LOCATIONS BETWEEN BUTTS COUNTY LINE AND CR 188
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1999 ROW: 2001 CST: 2003 FED Share: GA Shure:
UNDERWAY $28,000
$3,810,000 $3,048,000
$762,000
PROJECT: 232330- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.8 /1.29
DESCRPT: SR 36 AT FLAT SHOALS/STEELE RD/CR 18/ & HENDERSON MILLlCR506
LUMP SUM PROJECT
PE: 1999 ROW: LOCL CST: 2001 FED Share: GA Share:
UNDERWAY
$341,000 $306,900 $34,100
PROJECT: 242230- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 142 FM 1-20 TO ALCOVY RD IN COVINGTON EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 1.21 /1.95
PE: 1997 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $100,000
$3,996,000 $3,196,800
$799,200
PROJECT: 245190- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.56/0.90
DESCRPT: SR 212 @CR 191N OAK HILL-INTERSECTION IMPROVEMENTS
PE: 2000 ROW: 2003 CST:
UNDERWAY $304,000
AFTER 2003
PROJECT: 245380- TYPE WORK: REPLACE BRIDGE' LENGTH (miles / km)
DESCRPT: SR 20@ SOUTH RIVER NEWTON-HENRY CO LINE
ASSOCIATED PROJECTS: 24538X-
FUND: BRIDGE
PE: 2001
0.27/0.43
ROW: 2002
CST: 2003
FED Share:
GA Share:
$32,000 $10,000 $1,374,000 $1,099,200 $274,800
Page 260 of336
"'~--_""'
STATE TRANSPORTATIONIMPROVEMENT PROGRAM
9/21/00
t<IlI"l\:t _ _,_~~"_,,,,,,,,~_~,,_,,,,,~_,,,,,,,,,,,,,,,,,,,,,,.,,,,,_,,,,,,,,,,,,,,1I"W'_'_"""_""'
. _...'
,~_...__ .....,....,.:..._,r.<. t, ~ . . . . "._.~~..,,..~.,
NEWTON COUNTY
PROJECT: 271304- TYPE WORK: LANDSCAPING LENGTH(miles / km)
DESCRPT: STREETSCAPES IN THE CITY OF COVINGTON-PHASE I
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$959,000 $767,000
OTH Share:
PROJECT: 33317X- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0/0.00
DESCRPT: SR 36 @ SOUTH RIVER AT BUTTS-NEWTON CO L1NEIS~E B,UITS 333172
PE:NONE ROW: NONE CST: NONE
$192;000
ASSOCIATED PROJECTS: 333172-
; \-
j , ,"
~
I 'I
Page 261 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
__)
---"--------_._ -_._--_.-_. .- ... 9/21/00 . ~,-~-_.----".
-------"
OCONEE COUNTY
PROJECT: 0000169 TYPE WORK: LANDSCAPING
ATHENS TIP #
LENGTH (miles I km)
DESCRPT: US 441/SR 53 INTERCHANGE LANDSCAPING
FUND: STP
0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$75,000 $60,000
OTH Share:
PROJECT: 122660- TYPE WORK: WIDENING
FUND: STATE
ATHENS TIP # 11-05(2)
LENGTH (miles I km), 8.74/14.07
DESCRPT: SR 24/US 44 I FM N OF APALACHEE RIVER TO WATKINSVILLE BP
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1994 ROW: 2003 CST:
$15,000
UNDERWAY $3,664,000 AFTER 2003
PROJECT: 142060- TYPE WORK: WIDENING
FUND: STP
ATHENS TIP # 11-05
LENGTH (miles / km) 1.8512.98
DESCRPT: SR 53 FM HOG MTN RD (CR 274) TO SR I5/US 441 IN WATKINSVILLE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 141980-
PE: 1998 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $1,100,000 $3,500,000 $2,800,000
$700,000
PROJECT: 170543- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.2 /0.32
ROW: LOCL
DESCRPT: CR 121/HALE ROAD@GREENBRIARCREEK 4.5 MI SE OF FARMINGTON
CST: 2002
FED Share:
GA Share:
UNDERWAY
$393,000 $314,400 $78,600
PROJECT: 171460- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
ATHENS TIP # V-02
LENGTH (miles I km) 2.5/4.03
DESCRPT: SIMONTON BRIDGE ROAD FM WATKINSVILLE TO CLARKE COUNTY
ASSOCIATED PROJECTS: 141970-
PROJECT: 171574- TYPE WORK: SIDEWALKS
FUND: STP
ATHENSTlP#V-05
LENGTH (mi/eslkm) 4.9/7.89
DESCRPT: STREETSCAPES FOR BUTLER'S CROSSING IN WATKINSVILLE
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PE: 2003 ROW: LOCL CST: 2003 FED Share:
PROJECT: 245130- TYPE WORK: REPLACE BRIDGE
FUND: STP
LENGTH (miles / km) 0.43 10.69
DESCRPT: SR 15 @ ROSE CREEK BETWEEN GREENSBORO & WATKINSVILLE
OTH Share:
PE: 1997 ROW: 2001 CST:
$394,000 $315,000
$79,000
$23,000
$227,000 $182,000
$45,000
UNDERWAY $50,000
AFTER 2003
Page 262 of336
STATE TRANSPORTAT.ION IMPROVEM, ENT PROGRAM
_ _ _ _ _ _ _ _ _._._._ _,
"_'_00 _.
9/21/00
. _ ,_ . _
~
. _.,_
_ _..,
,
OGLETHORPE COUNTY
PROJECT: 222460- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 10 FM 10.2-12.2113.7-15.0115.3-16.2IWILKES: 0-1.715.5-7.q EXIST. LANES: 02 PROPOSED LANES: 03
FUND: STP 7.4 / I 1.91
PE: 1997 ROW: 2001 CST: .
UNDERWAY $100,000
AFTER 2003
PROJECT: 231910- TYPE WORK: NEW CONSTRUCTION
FUND: STP ..
LENGTH (miles / km) 6.3 /10. 14
DESCRPT: CRA WFORDILEXINGTON BYP FM E OF CR 26/SMOKEY RD SE TO SR 22
EXIST. LANES: 00 PROPOSED LANES: 04
PE: 1999 ROW: 2003 CST:
UNDERWAY $1,459,000 AFTE;R 2003
PROJECT: 232315- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.2 I /0.34
DESCRPT: SR 77@GOOSEPONDCREEK 14.5 MI NE OF LEXINGTON
PE: 1999 ROW: 2003
CST~
UNDERWAY $10,000
AFTER 2003
PROJECT: 245370- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 22 @ LONG CREEK 3.5 MI S OF LEXINGTON
FUND: BRIDGE 0.23 /0.37
PE:1999, ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 245371- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
.. LENGTH (miles / km). 0.23 /0.37
DESCRPT: SR 22 @ BIG CLOUDS CREEK 3.8 MI E OF SMlTHSONIA
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 245372- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
. LENGTH (miles / km) 0.24/0.39
DESCRPT: .SR 22 @ SOUTH FORK BROAD RIVER.4 MI NE 9F SMlTHSONIA
PE: 1999 , ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page 263 of336
---------_._--_.
- - - _.._----------_._._---
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
PAULDING COUNTY
PROJECT: 621570- TYPE WORK: WIDENING LENGTH (miles I km)
DESCRPT: SR 61 FM SR 120 CONN TO SR 6/DALLAS BYPASS EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 641830-
FUND: NHS 3.2 15.15
PE: 1996 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $3,500,000 $8,000,000 $6,400,000 $1,600,000
PROJECT: 631142- TYPE WORK: MINOR WIDEN & RESURF LENGTH (miles I km)
FUND: STP 10 00
DESCRPT: CR 440lCR 470lCR 441 FM CR 168 TO CR 226/PAULDING ..SEE POLK
ASSOCIATED PROJECTS: 631148-
PE:NONE ROW: NONE . CST: NONE
PROJECT: 632660- TYPE WORK: REPLACE BRIDGE LENGTH (mileslkm)
DESCRPT: SR 120 OVER LANE CREEK 2.3 MI SW OF DALLAS
FUND: BRIDGE
PE:1997
0.42/0.68
ROW: 2000
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY
$413,000 $330,400
$82,600
PROJECT: 632776- TYPE WORK: INTERSECTION IMPROVEMENT LENGTH (miles I km)
DESCRPT: SR 92 AT CR 283/BROWNSVILLE ROAD LUMP SUM PROJECT
FUND: STP 0.54/0.87
PE: 1999 ROW: 2001 CST: 2001 FED Share: GA Share:
UNDERWAY $170,000 $403,000 $362,700 $40,300
PROJECT: 64Y830- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles I km) 0.29 10.47
DESCRPT: SR 61 FM CR 341 TO SR 6/DALLAS BYP & RR BR{FOR 31A $}/641830
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 641830-
PE: 1993 ROW: 2001 CST:
UNDERWAY $100,000
AFTER 2003
PROJECT: 670366- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles I km) 0.23/0.37
ROW: LOCL
DESCRPT: CR 842/0LD HARRIS ROAD@SOUTHERN RR (719808G) SE OF DALLAS
CST: 2003
FED Share:
GA Share:
OTH Share:
. UNDERWAY
$929,000 $743,200
$92,800 $93,000
.!:-
Page 264 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00.
PEACH COUNTY
PROJECT: 0000128 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles I km)
FUND: STP 0/0.00
DESCRPT: BYRON RAILROAD DEPOT MUSEUM/RAILROAD CABOOSE & CITY PARK
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000757 TYPE WORK: BARRIERS
WARNER ROBINS TIP # 2000( I)
LENGTH (miles I km)
DESCRPT: RICHARD RUSSELL PKWY NOISE BARRIERS
OTH Share:
FUND: STATE 0/0.00
PE: 1995 ROW: LOCL CST: 2001
GA Share:
$120,000 $96,000 $24,000
UNDERWAY $1,000,000
$1,000,000
PROJECT: 3 11540- TYPE WORK: INTERCHANGE
WARNER ROBINS TIP # WR 1-I 993( I)
LEN(iTH (miles I km)
DESCRPT: 1-75 @ SR 96
EXIST. LANES: 02 PROPOSED LANES: 04
. FUND: 1M I 11.61
PE: 1993 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY $4,444,000
$3,999,600 $444,400
PROJECT: 311700- TYPE WORK: INTERCHANGE
WARNER ROBINS TIP # WRI-1996(3)
LENGTH (mileslkm)
DESCRPT: 1-75 AT THE PROPOSED RICHARD RUSSELL PARK WAY
: EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 363760-
FUND:NHS 0.2/0.32
, '.
PE: 1995 ROW: 1999 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$3,900,000 $3,120,000
$780,000
PROJECT: 36313X- TYPE WORK: WIDENING LENGTH (miles I km)
FUND: ST.ATE 0 10.00
DESCRPT: SR 96 FM E OF FLINT RIV TO FT VALLEY BY/SR 49C & BRID/CRA WFD
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 363130-
PE:NONE ROW: NONE CST: NONE
c PROJECT: 363760- TYPE WORK: ,NEW CONSTRUCTION
FUND: STATE
WARNER ROBINS TIP # WR 1-1996(2)
LENGTH (miles I km) 5 18.05
DESCRPT: RICHARD RUSSELL PKWY FM E OF 1-75 TO CORDER RD/HOUSTON
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 36376X- 311700-
PE: 1995 ROW: LOCL CST: 2001
GA Share:'
UNDERWAY $11,843,000 $11,843,000
PROJECT: 363790- TYPE WORK: NEW CONSTRUCTION
FUND: STATE
LENGTH (miles I km) 0.55 10.89
DESCRPT: SR 894/UNIVERSITY BLVD FM 5R 49 TO ST COLLEGE DR-FT VALLEY
EXIST. LANES: 00 PROPOSED LANES: 02 .
PE:NONE ROW: 1997 CST: 2001
GA Share:
UNDERWAY $791,000
$791,000
PROJECT: 363820- TYPE WORK: WIDENING
FUND: STATE
LENGTH (mileslkm) 4.87/7.84
DESCRPT: SR 49C1FT VALLEY BYP FM BEVERLY RD NE TO SR 49 - ADD 2 LANES
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 2001 CST:
UNDERWAY $10,000
AFTER 2003
Page 265 of336
STATE TRA/ySPORTATION IMPROVEMENT PROGRAM
9/21/00
PEACH COUNTY
PROJECT: 363910- TYPE WORK: REALIGNMENT
FUND: NHS
LENGTH (miles / km) . 1.2/1.93
DESCRPT: 1-75 @SR49RELOCATE FRONTAGE RDS CHAPMAN RD & INDUST BLVD
PE: 2001 ROW: CST:
$151,000 AFTER 2003 AFTER 2003
Page 266 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
PICKENS COUNTY
PROJECT: 0000142 TYPE WORK: RICiHTS-OF-WAY LENGTH (miles / km)
FUND: STP 0 /0.00
DESCRPT: BURNT MOUNTAIN SCENIC PRESERVATION PR9PERTY ACQUISITION
PE:LOCL ROW: 2001 CST: NONE
$938,000
PROJECT: 621490- TYPE WORK: WIDENING LENGTH (miles / km)
.DESCRPT: SR 53 FM SR 515/APD TO CR 243/1NDUSTRIAL BLVD EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 1.4.12.25
PE: 1992 ROW: 2003 CST:
UNDERWAY $1,200,000 AFTER 2003
PROJECT: 621590- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) 2.36/3.80
DESCRPT: SR 53 - WB PASSING LNS EAST OF TATE MP 20.4-21.3 & 22.6-24.1
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 2000 ROW: 2001 CST: 2001 FED Share: GA Share:
UNDERWAY $0
$1,633,000 $1,306,400
$326,600
PROJECT: 621595- TYPE WORK: PASSING LANES
FUND: STP
LENfiTlI (miles / km) 2.94/4.73
DESCRPT: SR 53 - EB PASSING LNS EAST OF TATE MP 24.3-25.4 & 26.5-28.4
EXIST. LANES: 02 PROPOSED LANES: 03
PE:2000 ROW: 2002 CST:
UNDERWAY $175,000
AFTER 2003
PROJECT: 642140- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles / km) 0.2 /0.32
ROW: 2001
DESCRPT: SR 136 BRlDGE REPLACEMENT OVER TALKING ROCK CREEK N OF SR 53
CST: 2002
FED Share:
GA Share:
UNDERWAY $14,000
$466,000 $372,800
$93,200
Page 267 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
. PIERCE COUNTY
PROJECT: 0001115 TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: CR 191/BOWEN RD IN BLACKSHEAR@CSX# 637256R LUMP SUM PROJECT
FUND: STP 0/0.00
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$100,000 $80,000 $20,000
PROJECT: 522340- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 6.9/1 1.11
DESCRPT: SR 38/US 84 FM CR I07/0FFERMAN TO S CITY LMTS SCREVEN/WAYNE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 52234X-
PE: 1993 ROW: 2001 CST:
UNDERWAY $1,667,000 AFTER 2003
PROJECT: 533 170- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.26/0.42
DESCRPT: SR 15 @ BIG SATILLA CREEK AT APPLING COUNTY LINE
ASSOCIATED PROJECTS: 533 I7X-
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 542370- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.4 /0.64
DESCRPT: SR 203/STRICKLAND STREET AT OLD ALMA ROAD/CR 309
PE: 2001 ROW: CST:
$10,000 AFTER 2003 AFTER 2003
(
Page 268 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9121100
PIKE COUNTY
PROJECT: 333110- TYPE WORK: INTERSECTION IMPROVEMENT
.
LENGTH (miles / km)
DESCRPT: SR 18/SR 109 AND SR 74 INTERSECTION IMPROVEMENT
FUND: STP 0.2/0.32
PE: 2000 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY
$547,000
~
$605,000
$484,000
$121,000
PROJECT: 333145- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 18 @ ELKINS CREEK .1 MI W OF ZEBULON
FUND: BRIDGE 0.24/0.39
PE: 1999 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 343385- TYPE WORK: REPLACE BRIDGE
I
LENGTH (miles / km)
DESCRPT: SR 109 @ ELKINS CREEK .5 MI E OF MOLENA
FUND: BRIDGE 0.24/0.39
PE: 1999 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
Page 269 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
POLK COUNTY
PROJECT: 0000115 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: DEPOT/HISTORIC DISTRICT OF CEDARTOWN
FUND:STP 0/0.00
PE:LOCL ROW: LOCL . CST: 2001 FED Share:
PROJECT: 0000116 TYPE WORK: SIDEWALKS LENGTH (miles / km)
DESCRPT: ROCKMART STREETSCAPE PROJECT
FUND: STP 0/0.00
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 620645- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 6.27/ 10.09
DESCRPT: SR 6 FM OLD CEDARTOWN RD/CR 193 E TO SR IOIlROCKMART/62Y645
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 62Y645-
OTH Share:
PE: 1992 ROW: 1997 CST: 2003 FED Shure: GA Share:
$655,000 $524,000
$131,000
$310,000 $248,000
$62,000 UNDERWAY UNDERWAY
$5,017,000 $4,013,600 $1,003,400
PROJECT: 62I43X- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: SR 113 FM TAYLORSVILLE CL TO CR 31/STILESBORO..SEE BARTOW
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 621430-
PE:NONE ROW: NONE CST: NONE
PROJECT: 621860- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles/ km) 5.75/9.26
DESCRPT: CEDARTOWN BYPASS WIDENING FM SR 100 N TO JUST S. OF CR 334
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 62Y860-
PE: 1995 ROW: 2001 CST:
UNDERWAY $845,000
AFTER 2003
PROJECT: 62Y645- TYPE WORK: WIDENING
FUND: HPP
LENGTH (miles / km) 6.27 / 10.09
DESCRPT: SR 6 FM OLD CR 193 E TO SR 101 - FOR HPP $ SEE 620645
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 620645-
PE: 1992 ROW: NONE CST: 2003 FED Share: GA Shure:
UNDERWAY
$4,490,000 $3,592,000
$898,000
PROJECT: 631148- TYPE WORK: MINOR WIDEN & RESURF
FUND: STP
LENGTH (miles / km) 6.53 / 10.51
DESCRPT: CR 440/470/441 FM CR 168 THRU PAULDING TO CR 226/0LD ATL HWY
ASSOCIATED PROJECTS: 631142-
PE: 1992 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $129,000
$3,099,000 $2,479,200
$619,800
PROJECT: 63114X- TYPE WORK: MINOR WIDEN & RESURF
FUND: STP
LENGTH (miles / km) 0/0.00
DESCRPT: CR 342/CR 440 FM CR 345/HARALSON TO CR I68/POLK-SEE HARALSON
ASSOCIATED PROJECTS: 631145-
PE:NONE ROW: NONE CST: NONE
Page 270 of336
STATE TRANSPORTATION IMPROVEMENT PRo,GRAM
9/21/00
POLK COUNTY
PROJECT: 641880~ TYPE WORK: TURN LANES LENGTH (miles / km)
DESCRPT: SR I BUSFM THORNTON AVE TO CEDARTOWN BYPASS
FUND: NHS 1.08/1.74
PE: 1994 ROW: 1999 CST: 2001 FED Share:
UNDERWAY UNDERWAY $1,271,000 $1,271,000
PROJECT: 670678- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE:2001
.. L.ENGTH (miles / km) 0.2 /0.32
ROW: LOCL
DESCRPT: CR 182/BETHLEHEM ROAD@FISH CREEK 5.7 MI W OF ROCKMART
CST: 2003
FEDShllre:
GA Share:
$19,000
$191,000 .$152,800
$38,200
.".
Page 2710/336 )
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
PULASKI COUNTY
PROJECT: 322180- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 9.5 /15.30
DESCRPT: SR 27/US 341 FM SR 230/HAWKINSVILLE E TO DODGE CO LINE
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 1994 CST: 2001
GA Share:
UNDERWAY UNDERWAY $18,670,000
$18,670,000
PROJECT: 333080- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 257 @ TEN MILE CREEK 3.5 MI NW OF FINLEYSON
FUND: BRIDGE
PE: 1999
0.22/0.35
ROW: 2001
CST: 2003
FED Share:
,GA Share:
UNDERWAY $10,000
$330,000 $264,000
$66,000
PROJECT: 343000- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.26 /0.42
DESCRPT: SR 230 @ BIG CREEK 5.6 MILES WEST OF HAWKINSVILLE
PE: 1995 ROW: 2001 CST:
UNDERWAY $50,000
AFTER 2003
Page 272 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
PUTNAM COUNTY
PROJECT: 0001077 TYPE WORK:' . INTERSECTION IMPROVEMENT
FUND: MIN. GUARAN PE: 2001
LENGTH (miles 1 km) 0.53/0.85
ROW: 2003
DESCRPT: SR 16 FM JEFFERSON AVE TO EAST OF S. GRAND AVE IN EATONTON
CST:
$49,000 $168,000 AFTER 2003
PROJECT: 222470- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 10.4 116.66
DESCRPT: SR 24/US 441 FM CR 245 TO EATONTON BYPASS @ US 129
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 22Y470-
PROJECT: 222580- TYPE WORK: WIDENING
FUND: STATE
.
LENGTH (miles 1 km) 9.04/14.55
DESCRPT:SR 24/US 441 FM EATONTON BP@CR 17/REIDS RD TO MORGAN CL
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 2003 CST:
UNDERWAY $2,489,000 AFTER 2003
PE: 1994 ROW: 2003 CST:
UNDERWAY $4,809,000 AFTER 2003
PROJECT: 231270- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles 1 km) 0.31 10.50
DESCRPT: SR 16 OVER THE OCONEE RIVER @ HANCOCK COUNTY LINE
PE: 1997' ROW: 2001 CST:
UNDERWAY $50,000
AFTER 2003
PROJECT: 23 1610- TYPE WORK: WIDENING
FUND: STP
LENGTH (mileslkm) 5.14/8.28
DESCRPT: SR 24/EATONTON BYPASS- REMAINING TWO LANES NORTHBOUND
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1995 ROW: 1999 CST: 2003 FED Share: GA Share:
UNDERWAY UNDERWAY ~ $2,426,000 $1,940,800
$485,200
PROJECT: 231620- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles 1km) 5.07 18.16
DESCRPT: SR 44 FOUR PASSING LANES NB & SB BETWEEN EATONTON & GRAY
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1998 ROW: 2001 CST:
UNDERWAY $100,000
AFTER 2003
PROJECT: 232295- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles 1km) 0.22/0.35
DESCRPT: SR 16@ ROOTY CREEK IN EAST EATONTON
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 245350- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 16 @ CROOKED CREEK 6 MI E OF EATONTON
FUND: BRIDGE
PE: 1999
0.22/0.35
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY , $10,000
$639,000 $511,200 $127,800
Page 273 of336
STATE TRANSPORTATION IMpJUivEMENT PROGRAM
9/21/00
PUTNAM COUNTY
PROJECT: 270760- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: CR 212/FH 24 SOUTH OF SR 24 @TOWN CREEK
FUND: BRIDGE
PE: 1996
0.4 /0.64
ROW: LOCL
CST: 2002
FED Share:
GAShare:
UNDERWAY
$515,000 $412,000 $103,000
PROJECT: 271130- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: MARTIN MILL RD/eR 29/FH 27 @ LITTLE RIVER
FUND: FOREST HWY PE: 1996
0.79/1.27
ROW: LOCL
CST: 200 I
FED Share:
UNDERWAY
$1,404,000 $1,404,000
Page 274 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
QUITMAN COUNTY
PROJECT: 431520- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.38/0.61
DESCRPT: SR SO/US 82 REALIGNMENT IN THE CITY OF GEORGETOWN
PE: 1996 ROW: 1998 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY
$2,000,000 $1,800,000
$200,000
. Page 275 of336
STATE TRANSPORTATION IMpROVEMENT PROGRAM
9/21/00
RABUN COUNTY
PROJECT: 0000306 TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 28 @ CHATIOOGA RIVER 13 MI NE OF CLA YTON
FUND: BRIDGE 0.24 10.39
PE: 2001 ROW: CST:
$66,000 AFTER 2003 AFTER 2003
PROJECT: 121950- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (mileslkm) 2.32/3.74
DESCRPT: SR 2 FM LAKE BURTON BRIDGE TO CHARLIE MTN RD/CR 94 & REALIGN
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1993 ROW: 1996 CST: 2001 FED Share: GA Share:
UNDERWAY UNDERWAY $8,444,000 $6,755,200 $1,688,800
PROJECT: 122320- TYPE WORK: WIDENING
FUND:NHS
LENGTH (mileslkm) 9.76/15.71
DESCRPT: SR 15IUS 441 FM N OF TALLULAH FALLS TO S CL OF CLAYTON
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 12Y320-
PE: 1993 ROW: 2002 CST:
UNDERWAY $19,863,000 AFTER 2003
PROJECT: 12Y090- TYPE WORK: WIDENING
FUND:NHS
LENGTH (miles 1 km) 0/0.00
DESCRPT: SR 15/US 441 FM NO. CUCLA YTON TO NC LINE-FOR FED PEII 22090
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 122090-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 171580- TYPE WORK: . REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: CR 80 AT TALLULAH RIVER 6.6 MI SW OF TIGER
FUND: BRIDGE
PE: 2000
0.22/0.35
ROW: LOCL .
CST: 2003
FED Share:
GA Share:
UNDERWAY
$547,000 $437,600 $109,400
" Page 276 of336
;----------~~~~~~---- -- - --------------~~- - - - - - - - - - - - - - - - - - - - ~ -
STATE TRANSPORTATIONIMPROVEMENTPROGRAM
9/21/00
RANDOLPH COUNTY
PROJECT: 422235- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 7.81 112.57
DESCRPT: SR IFM CARNEGIE VILULAH RD/CR 153 TO CUTHBERT BYPASS
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 431530- 42Y235-
PE: 1995 ROW: 2003 CST:
UNDERWAY $922,000
AFTER 2003
PROJECT: 42223X- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 0/0.00
DESCRPT: SR I FM BLUFFTON BYP TO CARNEGIE VILULAH RD/CR 153 - 422230
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 422230-
PE."NONE ROW: NONE CST: NONE
PROJECT: 422240- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 8.5/13.69
DESCRPT: SR IIUS 27 FR CUTHBERT BYP TO CR 116/LUSCIOUS QUEEN ROAD
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1993 ROW: 1999 CST: 2003
GA Share:
UNDERWAY UNDERWAY $21,020,000
$21,020,09
PROJECT: 422245- TYPE WORK: WIDENING LENGTH (miles 1 km)
DESCRPT: SR IIUS 27 FR CR 116 TO LUMPI\IN BYPASS/& STEWART EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 42224X-
FUND: STATE 7.78 1 12.53
PE: 1996 ROW: 1999 CST: 2003
GA Share:
UNDERWAY UNDERWAY $19,840,000
$19,840,000
PROJECT: 431530- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
LENGTH (miles 1 km) 0.21 10.34
ROW: NONE
,DESCRPT: SR IIUS 27@ GEORGIA/ALABAMA RR 2.2 MI S. OF CUTHBERT
CST: 2002
FED Share:
ASSOCIATED PROJECTS: 422235-
GA Share:
UNDERWAY
~
$631,000 $504,800 $126,200
PROJECT: 432095- TYPE WORK: REPLACE BRIDGE
.
LENGTH (miles 1 km)
DESCRPT: SR 50/US 82 @ PACHITLA CREEK 4 MI E OF CUTHBERT
FUND: BRIDGE 0.21/0.34
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 442955- TYPE WORK: REPLACE BRIDGE LENGTH (miles 1 km)
DESCRPT: SR 216 @CARTER CREEK 4.6 MI S OF CUTHBERT
FUND: BRIDGE 0.22/0.35
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: M000337 TYPE WORK: SHOULDER WORK LENGTH (miles / km)
DESCRPT: SR 266 FM CLAY CO LN TO SR 50 LUMP SUM PROJECT
FUND: STP 11.2 118.06
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$657,000
$525,600
..
$131,400
Page 277 of336
---------
_._-,-_ __ STATE TRANSPORTATION IMPROVEMENT PROGRAM
--_._---_.. .. _~--._--_
_--. .."..
9/21/00
.
---------_-.,..------
TERRELL COUNTY
PROJECT: 0000452 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.22 /0.35
DESCRPT: CR 1M/SASSER-HEROD ROAD @BRANTLEY CREEK WEST OF SASSER
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 0000453 TYPE WORK: .REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.22/0.35
DESCRPT: CR 1M/SASSER-HEROD ROAD @ CHICKASA WHATCHEE CREEK
'-
PE: 2001 ROW: LOCL CST:
$20,000 AFTER 2003
PROJECT: 0000454 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2001
LENGTH (miles / km) 0.2 /0.32
ROW: LOCL
DESCRPT: CR I i/BELLFLOWER ROAD @ HEROD CREEK 3.5 MI SW OF DA WSON
CST: 2003
FED Share:
GA Share:
$20,000
$220,000 $J76,000
$44,000
PROJECT: 431410- TYPE WORK: MINOR WIDEN & RESURF
FUND: STP
LENGTH (miles / km) 4.617.41
DESCRPT: SR 49 FM SR 45 TO SUMTER COUNTY LINE & CORRECT HORIZ ALIGN.
ASSOCIATED PROJECTS; 43 J41X-
PE: 2000 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page 301 of336
STATE TRANSPORTAI'IONIMPROVEMENT PROGRAM
---_._-~-------~----
9/21/00
_ _ _ _ _ _ _ _ u .. ~_.~,
THOMAS COUNTY
PROJECT: 0000814 TYPE WORK: RR XING LENGTH (miles I km)
FUND: STP 0 10.00
DESCRPT: CR I38/0LD CASSIDY RD IN THOMASVILLE@AGLF# 637024B
LUMP SUM PROJECT
PE:NONE ROW: NONE CST: 2001 FED Share; GA Share:
..
_
$100,000 $80,000 $20,000
PROJECT: 421970- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1992
LENGTH (miles I km) I I 1.61
ROW; 2001
DESCRPT: SR 38/US 84 BUS @ GA-FLA RAILNET INC NWITHOMASVILLE
CST: 2001
FED Share:
GA Share:
UNDERWAY $50,000
$4,126,000 $3,300,800
$825,200
PROJECT: 431150- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (mileslkm) 0.510.81
ROW: LOCL
DESCRPT: CR 299 @ BIG CREEK APPROX 3 MI E OF JCT SR I (I /MITCHELL CO
CST: 2001
FED Share:
ASSOCIATED PROJECTS: 43115X-
GA Share:
UNDERWAY
$501,000 $400,800 $100,200
PROJECT: 431152- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles I km) 0.2 10.32
ROW: LOCL
DESCRPT: CR 299 @ LITTLE CREEK APPROX 3 MI E OF JCT SR III & MITCHELL
CST: 2001
FED Share:
ASSOCIATED PROJECTS: 431152-
GA Share:
UNDERWAY
$334,000 $267,200
$66,800
PROJECT: 431670- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles I km) 3.77 16.07
DESCRPT: SR 35/WEST THOMASVILLE BYP FM SR 35BU N TO SR 38/US 84
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 43Y670-
PE: 1995 ROW: 2002 CST:
UNDERWAY $100,000
AFTER 2003
PROJECT: 442800- TYPE WORK: RR XING LENGTH (mileslkm)
DESCRPT: SR 188 @ SR 3 & GNFLA RAILNET INC CROSS REAL
FUND: STP 0.2/0.32
PE: 2000 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $2,000 .
$256,000 $204,800
$51,200
PROJECT: 442965- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (mileslkm) 0.21/0.34
DESCRPT: SR 33 @ REEDY CREEK APP .8 MI S OF PAVO
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003 .
PROJECT: 471436- TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles I km)
DESCRPT: MULTI-USE FACILITIES IN DOWNTOWN THOMASVILLE
FUND: STP 010.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
$1,250,000 $1,000,000
$250,000
Page 302 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
fj/21/00
,
n_
....... ,.__
~ l'M'"
l'
._,.... !_""'_""'
.......~..,.
.._"'__ .... ........ ~,_,
. _ , . " ~ , ~ ._.__,,.....""_~,
x _ _ ._,"--"'",..
TIFT COUNTY
PROJECT: 0000087 TYPE WORK: HISTORIC PRESERVATION LENGTH (miles / km)
DESCRPT: GEORGIA AGRIRAMA RAILROAD IN TIFTON
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$313,000 $250,000
PROJECT: 0000088 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
LENGTH (miles / km) , 0 /0.00
DESCRPT: TIFTON MULTI-PHASED PED SAFETY & DOWNTOWN BEAUTIFICATION
OTH Share:
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$63,000
$518,000 $414,000
PROJECT: 0000089 TYPE WORK: LANDSCAPING
FUND: STP
LENGTH (miles / km) 0/0,00
DESCRPT: TIFTON MULTI-PHASED BEAUTIFICATION @ 1-75& HWY 41
OTHShare:
PE: LOCL ' ROW: LOCL CST: 2001 FED Shure:
$104,000
$88,000 $70,000
.PROJECT: 0001117 TYPE WORK: RR XING , LENGTH (miles / km)
DESCRPT: CR 36/MT ZION RD IN CHULA @ NS # 723696S ' LUMP SUM PROJECT
FUND: STp 0/0,00
OTHShare:
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$18,000
$100,000 , $80,000 $20,000
PROJECT: 0001257 TYPE WORK: ,BRIDGES LENGTH (miles / km)
DESCRPT: 1-75 AT ADCOCK RD/CR 185 - BRIDGE REPAIR LUMP SUM PROJECT
FUND: STATE 0.1/0.16
PE:NONE ROW: NONE CST: 2001
GA Shure:
$300,000 $300,000
PROJECT: 410240- TYPE WORK: WIDENlNq
FUND: NHS
.LENGTH (miles / km) 8/12.88
DESCRPT: 1-75 FM N CITY LIMITS OF TIFTON TO TURNER COUNTY LINE-PH I
EXIS~. LANES: 04 PROPOSED LANES: 06
PE: 1986 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
, $33,260,000 $26,608,000
$6,652,000
PROJECT: 41053X- TYPE WORK: WIDENING
FUND:NHS
LENGTH (miles / km) 0/0.00
.: DESCRPT: 1-75 FM CR 246/COOK TO CR 2041TIFT/ SEE COOK COUNTY- 410530
EXIST. LANES: 04 PROPOSED LANES: 06
ASSOCIATED PROJECTS: 410530-
PE:NONE ROW: NONE CST: NONE
PROJECT: 422320- TYPE WORK: MEDIAN WORK
FUND: NHS
LENG'rH (miles / km) 0.76/1.22
DESCRPT: SR 520/US 82 FM MAGNOLIA DR EAST TO CENTRAL AVEITIFTON
PE: 1996 ROW: 1999 CST: 2002, FED Share: GA Share:
,UNDERWAY UNDERWAY
$1,009,000 $807,200 $201,800
Page 303 of336
,
~
STATE TRANSPORTATION IMPRlJVEMENT PROGRAM
9/21/00
IIt
~ _ _ ...."" ......, _... _
....
y
~.._ _
TIFT COUNTY
PROJECT: 431500- TYPE WORK: BRIDGE REHAB
FUND: STP
LENGTH (miles I km) 0.05/0.08
DESCRPT: SR 7/US 411 SOUTH MAIN .STREET OVER LITTLE RIVER TRIBUTARY
PE: 1997 ROW: 2001 CST: 2002 FED Share: GA Share:
UNDERWAY $1,000
$148,000 $118,400
$29,600
PROJECT: 431700- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
PE: 1997
LENGTH (miles I km) 0.24 10.39
ROW: 1999
DESCRPT: SR 35/US 319 OVER ALAPAHA RIVER @TIFT-IRWIN COUNTY LINE
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY $1,269,000 $1,015,200
$253,800
PROJECT: 432112- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles I km) 0 10.00
DESCRPT: SR 125 @ NEW RIVER BERRIEN-TIFT CO LIN EISEE BERRIEN 43211 I
ASSOCIATED PROJECTS: 432111-
PE:NONE ROW: NONE CST: NONE
PROJECT: 450560- TYPE WORK: WIDENING
.FUND: STP
LENGTH (milesI km)
J 11.61
DESCRPT: VIRGINIA AVE/CS 746 IN TIFTON FM SR 520/US 82 N TO 8TH ST
EXIST. LANES: 02 PROPOSED LANES: 04
PE:2001 ROW: LOCL CST:
$267,000 AFTER 2003
PROJECT: M000502 TYPE WORK: MINOR WIDEN & RESURF
FUND: 1M
LENGTH (milesI km) 6.3 110.14
DESCRPT: SR 401/1-75 FM N OF OAKRIDGE RD TO N OF BRIDGE OVER SR 7
LUMP SUM PROJECT
PE.NONE ROW: NONE CST: 2001 FED Share: GA Share:
$4,142,000 $3,313,600
$828,400
Page 304 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
,
,
9/21/00
TOOMBS COUNTY
PROJECT: 0000077 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: VIDALIA DOWNTOWN STREETSCAPE PHASE 2
FUND:STP 0/0,00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 522130- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles / km) 9.7 /15.62
DESCRPT: SR 4/US I FM LYONS CL TO SOUTH CLiOAK PARK IN EMANUEL.CO
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 52213X- 52Y130-
PE: 1993 ROW: 2002 CST: 2003
GA Share:
$500,000 $400,000
$100,000
UNDERWAY $1,455,000 $12,034,000
$12,034,000
PROJECT: 522320- TYPE WORK: NEW CONSTRUCTION
FUND: STP
LENGTH (miles / km} 2.15/3.46
DESCRPT: SR 30 FM W OF SUNSET DR TO BROADFOOT ST & 1-WAY PAIR/VIDALIA
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 1998 CST: 2002 FED Share: GA Share:
UNDERWAY UNDERWAY $3,981,000 $3,184,800
, $796,200
PROJECT: 52Y I80- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 4/US I FM SR 56 TO SR 29 - FOR FED PE; 522180 EXIST. LANES: 02 PROPOSED LANES: 04 ASSOCIATED PROJECTS: 522180-
FUND:NHS 0/0.00
PROJECT: 52Y190- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 4 FM SR 29 TO S CLiL YONS - FOR FED PE; 522190 EXIST.' LANES: 02 PROPOSED LANES: 05 ASSOCIATED PROJECTS: 522190-
FUND:NHS 010.00
PE: 2001 ROW: NONE CST: NONE
PE: 2001 ROW: NONE CST: NONE
$1,000
-
$1,000
PROJECT: 52Y200- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 4/LYONS FM S CTY LMTS TO N CTY LMTS- FOR FED PE; 522200
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 522200-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 52Y220- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 0/0.00
DESCRPT: SR 4/US 1 FM PLANT HATCH RD TO SR 56/APPLING - FOR FED PE;
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIA TED PROJECTS: 522220-
PE: 2001 ROW: NONE CST: NONE
$1,000
PROJECT: 542415- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.24 /0.39
DESCRPT: SR 56 @ ROCKY CREEK 13 MI SE OF LYONS
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003.
Page 305 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
TOOMBS COUNTY
PROJECT: 542416- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 147@COBB CREEK 17 MI S OF LYONS
FUND: BRIDGE 0.23/0.37
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT: 55061X TYPE WORK: TURN LANES
FUND: STP
LENGTH (miles I km) 0 10.00
DESCRPT: SR 292 IMPROVE FM MORN'SIDE TO LOWERY & TURN LNS ISEE 550610
ASSOCIATED PROJECTS: 550610-
PE:NONE ROW: NONE CST: NONE
Page 306 of336
STATE TRANSPORTATION IMl'ROVEMENT PROGRAM
9/21/00
TOWNS COUNTY
PROJECT: 000030 I TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
. LENGTH (miles / km) 0.22 /0.35
DESCRPT: SR 17- SR 75 @ HIA WASSEE RIVER 6.5 MI S OF HIAWASSEE
PE: 2001 ROW: ' CST:
$33,000 AFTER 2003 AFTER 2003
PROJECT: 0000302 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.22 /0.35
DESCRPT: SR 17- SR 75 @HIAWASSEE RIVER 3.6 MI S OF, HIAWASSEE
PE: 2001 ROW: CST:
$20,000 AFTER 2003 AFTER 2003
PROJECT: 0000303 TYPE WORK: REPLACE BRIDGE ,
FUND: BRIDGE
LENGTH (miles / km} 0.22/0.35
DESCRPT: SR 2/US 76 @ HIGHTOWER CREEK 6.1 MI E OF HIAWASSEE
PE: 2001 ROW: CST:
$40,000 AFTER 2003 AFTER 2003
PROJECT: 0000304 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
t
LENGTH (miles / km) 0.22/0.35
DESCRPT: SR 66 @ BRASSTOWN CREEK .5 MI NW OF YOUNG HARRIS
PE: 2001 ROW: CST:
$40,000 AFTER 2003 AFTER 2003
PROJECT: 0000305 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.22/0.35
DESCRPT: SR 66 @ CROOKED CREEK 3.2 MI NW OF YOUNG HARRIS
PE:2001 ROW: CST:
$66,000 AFTER 2003 AFTER 2003
PROJECT: 122230- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
LENGTH (miles I km) 0.5/0.81
ROW: 2001
DESCRPT: SR 2IUS 763 MILES SE/f-I1AWASSEE @ HIA WASSEE RIVER
CST: 2001
FED Share:
GA Share:
UNDERWAY $0
$596,000 $476,800 $119,200
PROJECT: 132710- TYPE WORK: WIDENING
FUND: APD
LENGTH (miles / km) 1.2 /1.93
DESCRPT: SR 515 FM SR 2 NORTH OF HIA WAS SEE TO THE NORTH CAROLINA LINE
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1998 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $1,200,000 $848,000 $678,400 $169,600
"
Page 307 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
~
9/21/00
"'''''-''_ _'''4A
'_._ " "
.......
....._ . _..._ "'_"'~'''''''"_'''~
....._ ...,._ _'''',.
TREUTLEN COUNTY
PROJECT: 0000131 TYPE WORK: BICYCLE/PED. FACILITY LENGTH (miles / km)
DESCRPT: SOPERTON STREETSCAPE
FUND:STP 0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 21095X- TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: 1-16 SAFETY UPGRADES @ SR 199 IN LAURENS & SR 29 IN TREUTLEN
OTH Share:
PE:NONE ROW: NONE CST: NONE
$106,000 $85,000
$21,000
ASSOCIATED PROJECTS: 2 I0950-
PROJECT: 231700- TYPE WORK: . PASSING LANES LENGTH (miles / km)
DESCRPT: SR 29 NB MP 4.95-6.051 SB MP 7.0-8.1 EXIST. LANES: 02 PROPOSED LANES: 03
FUND:STP 2.213.54
PE: 2000 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $5,000
$1,030,000 $824,000 $206,000
PROJECT: 245360- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.27/0.43
DESCRPT: SR 46 @ OCONEE RIVER OVERFLOW 7.6 MI SW OF SOPERTON
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page 308 of336
,----------------------------------------~-~-
~ -~~
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
TROUP COUNTY
PROJECT: 0000117 TYPE WORK: SIDEWALKS
DESCRPT: LAGRANGE STREETSCAPE
LENGTH (miles / km)
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000118 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
.
LENGTH (miles / km) 0/0.00
DESCRPT: YOUNG'S MILL BRIDGE PED/BIKE TRAIL & STREETSCAPING
OTH Share:
'PE: LOCL ROW: LOCL . CST: 20,01 FED Share:
PROJECT: 310730- TYPE WORK: INTERCHANGE
FUND: NHS
LENGTH (miles / km) 0.85/1.37
DESCRPT: 1-185 CONN @ 1~85 & 1-1851 INTERCHANGE CONSTRUCTION
OTH Shure:
PE: 1993 ROW: 2001 CST:
ASSOCIATED PROJECTS: 362910-
$1,125,000 $900,000
$225,000
$191,000 $153,000
$38,000 UNDERWAY $1,437,000 AFTER 2003
PROJECT: 321715- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles/km) 3.05/4.91
DESCRPT: SR 14/US 29 FM CR 403/UPPER GLASS BRIDGE TO OLD VERNON RD
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992' ROW: 2001 CST:
,UNDERWAY $2,454,000 AFTER 2003
PROJECT: 321720- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR I @ UNNAMED TRIBUTARY TO WEST POINT LAKE EXIST. LANES: 02 PROPOSED LANES: 04
FUND: BRIDGE
PE: 1991
0.3/0.48
R.OW: 2001
CST: 2001
FED Share:
GA Share:
UNDERWAY $200,000 $920,000 $736,000 $184,000
PROJECT: 322230- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 14 NB & SB FM MP 3.87-5.371 NB & SB MP 7.07-8.41 EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 2.84/4.57
PE: 1992 ROW: 2002 CST:
UNDERWAY $40.0,000
AFTER 2003
PROJECT: 322240- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 109 FM 1-85 TO 1-185 INCL 1-85 RAMP EXIST. LANES: 02 PROPOSED LANES: 05
FUND: STP 0.8/1.29
PE: 1992 ROW: 2001 CST:
UNDERWAY $120,000
AFTER 2003
PROJECT: 322250- TYPE WORK: WIDENING
FUND: NHS
LENGTH (miles / km) 1.42 /2.29
DESCRPT: SR I/US 27/LAGRANGE FM AUBURN ST TO SR 219/MORGAN ST
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 1992 ROW: 2002 CST:
UNDERWAY $12,725,000 AFTER 2003
Page 309 of336
,-
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
TROUP COUNTY
PROJECT: 343190- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles 1 km) 0.21 10.34
ROW: LOCL
DESCRPT: CS 769IJEFFERSON STREET @ CSX RAILROAD IN WEST LAGRANGE
CST: 2002
FED Share:
GA Share:
UNDERWAY
$710,000 $568,000 $142,000
PROJECT: :343455- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2001
LENGTH (mile's 1 km) 0.3 10.48
ROW: LOCL
DESCRPT: CS 10811GREENVILLE STREET@CSXRAILROAD IN EAST LAGRANGE
CST: 2002
FED Share:
GA Share:
OTH Share:
PROJECT: 351170- TYPE WORK: TURN LANES
FUND: STP
LENGTH (miles 1 km) . 0.63 11.0 I
DESCRPT: 'SR 14/US 29 LEFT TURN LANE FROM MEADOW WAY DR TO SR 14 SPUR
PE: 1997 ROW: 2001 CST: 2001 FED Share: GA Share:
$232,000
$2,579,000 $2,063,200
$257,800 $258,000
UNDERWAY $500,000
$1,160,000 $928,000 $232,000
PROJECT: 362910- TYPE WORK: NEW CONSTRUCTION
FUND: NHS
LENGTH (mileslkm) 5.53/8.90
DESCRPT: 1-185 CONN FM 1-185 @ 1-85 TO SR I/US 27 S OF BEECH CREEK
EXIST. LANES: 00 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 310730- 36Y9JO-
PE: 1993 ROW: 2001 CST: 2003 FED Share: GA Share:
UNDERWAY $5,170,000 $10,699,000 $8,559,200 $2,139,800
PROJECT: 36293X- TYPE WORK: WIDENING
FUND: HPP
LENGTH (miles 1 km) 0/0.00
DESCRPT: SRllUS 27 FM SR 54ITROUP TO PAITERSON/HEARDISEE 362930
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 362930-
PE:NONE ROW: NONE CST: NONE
PROJECT: 371390- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
LENGTH (mileslkm) 0.51/0.82
DESCRPT: CR 282/YOUNGS MILL RD FM CAMP DR OVER BEECH CK to EXIST RDWY
ROW: LOCL CST: 2001
FED Share:
GA Share:
UNDERWAY
. $911,000 $728,800 $182,200
PROJECT: 811066- TYPE WORK: WEIGH STATION
FUND: 1M
LENGTH (miles 1 km) 010.00
DESCRPT: UPGRADE 1-85 NB AND SB WEIGH STATIONS INCL SCALE REPLACEMENT
PE: 1995 ROW: NONE CST: 2002 FED Share: GA Share:
UNDERWAY
$5,000,000 $4,500,000
$500,000
Page 310 of336
STATE TRANSPORTATION IMPROVEMENT PRO.GRAM
9/21/00
TURNER COUNTY
PROJECT: 0000815 TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: CR 35 IN SYCAI\:10RE @ NS # 723706V LUMP SUM PROJECT
, FUND: STP 0/0,00
PE: NONE ROW: NONE CST: 2001 FED Sit are: GA Share:
$100,000 $80,000 $20,000
PROJECT: 0000816 TYPE WORK: RR XING LENGTH (miles / km)
DESCRPT: CR 113 IN SYCAMORE@NS # 723708J LUMP SUM PROJECT
FUND: STP
0/0.00
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$100,000 $80,000 $20,000
PROJECT: 0000817 TYPE WORK: RR XING LENGTH (miles / km)
. DESCRPT: CR 280 IN ASHBURN @ NS # 723617D LUMP SUM PROJECT
FUND: STP
0/0,00
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$100,000 $80,000 $20,000
PROJECT: 410250- TYPE WORK: WIDENING
FUND:NHS
" LENGTH (miles / km) 14.5123.35
DESCRPT: 1-75 FM N/SR 159 NR ASHBURN TO S/SR 300/CRISP - PHASE I
EXIST. LANES: 04 PROPOSED LANES: 06
. ASSOCIATED PROJECTS: 4I025X-
PE: 1986 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$55,000,000 $44,000,000 $11,000,000
PROJECT: 431570- . TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles / km}; 0.21 /0.34
ROW: 2001
DESCRPT: SR I 12 @ UTILE RIVER 3 MILES WEST OF SYCAMORE
CST: 2001
FED Share:
GA Share:
UNDERWAY $2,000
$950,000 $760,000 $190,000
. 'PROJECT: 431580" ' TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles /km) 0.2/0,32
ROW: 2001
DESCRPT: SR 112 @ ASHBURN BRANCH 1.6 MILES SW OF ASHBURN
CST: 2001
FED Share:
GA Share:
UNDERWAY $2,000
$250,000 $200,000
$50,000
PROjECT: 431590- TYPE WORK: REPLACE BRIDGE , LENGTH (miles / km)
DESCRPT: SR 112 @DANIELS CREEK SOUTHWEST OF ASHBURN
FUND: BRIDGE
PE: 1995
0.19/0.31
ROW: 2001
CST: 2001
FED Share: '
GA Share:
UNDERWAY $1,000
$700,000 $560,000 $140,000
PROJECT: 431600- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles / km) 0.2/0.32
ROW: 2001
DESCRPT: SR 112 @ BIG BRANCH 6.1 MILE SOUTHWEST OF SYCAMORE
CST: 2001
FED Share:
GA Share:
UNDERWAY $2,000
$715,000 $572,000 $143,000
Page 311 0/336
_.~_._-.,."...
.,..
STATE TRANSPORTATION IMPROVEMENT PROGRAM
"'C/-..__,
"' 9/21/00
4 _...~_'
TURNER COUNTY
PROJECT: 442980- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPi,: SR 112 @ DEEP CREEK 4.6 MI E OF ASHBURN
FUND: BRIDGE 0.27/0.43
PE: 1999 ROW: 2003 CST:
_
~
UNDERWAY $10,000
AFTER 2003
PROJECTr' 442981- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 112 @ DOUBLE RUN CREEK I MI SW OF REBECCA
FUND: BRIDGE 0.24 /0.39
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page312of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00.
TWIGGS COUNTY
PROJECT: 322470- TYPE WORK: WIDENING LENGTH (miles / km)
DESCRPT: SR 96 FM SR 87 TO 1-16 EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STP 7.5 / 12.08
PE: 2003 ROW: CST:
$1,164,000 AFTER 2003 AFTER 2003
PROJECT: 342980- TYPE WORK: PASSING LANES LENGTH (miles / km)
DESCRPT: SR 18 WB MP 2.31 - 3.6 & EB MP 7.0 - 8.5 IN WILKINSON EXIST. LANES: 02 PROPOSED LANES: 03 ASSOCIATED PROJECTS: 34298X-
FUND: STP 2.79 /4.49
PE: 2001 ROW: 2001 CST: 2002 FED Share: GA Share:
$125,000 $64,000
$1,419,000 $1,135,200
$283,800
.~
Page 313 of336
.. .;
. "i 1
STATE TRANSPORTATION IMPROVEMENTPROGRAM
9/21/00
I
I
UNION .cOUNTY
PROJECT.l 0000848 TYPE WORK: REPLACE BRIDGE
FUND: FOREST HWY PE: 2001
i
LENGTH (miles / km) 0.2 I /0.34
I
DESCRPTf CR 228/FS 236@COOPER CREEK 10.3 MI SW OF BLAIRSVILLE
I
I
ROW: NONE CST: 2003 FED Share:
! I
I I
PROJECT:: 132180- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2001
:
.
LENGTH (miles / km) 0.23/0.37
ROW: LOCL
DESCRPT: CR 341 @ NOTTLEY RIVER SW OF BLAIRSVILLE
CST: 2003
FED Share:
GA Share:
OTHShare:
$25,000
$500,000 $500,000
$40,000
$1,430,000 $1,144,000
$156,000 $130,000
.
Page 314 of336
r---=====:::::==================================:::::========================.=-~--=-~-~-
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
UPSON COUNTY
PROJECT: 0000132 TYPE WORK: MISCELLANEOUS IMPROVEMENTS FUND: STP LENGTH (miles I km) 0 10.00
DESCRPT: FLINT RlVER ACCESS/BOAT RAMP AND RESTROOMS
PE:LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0001 I 16 TYPE WORK: RR XING LENGTH (miles I km)
DESCRPT: CR 425/DEL RAY RD IN THE ROCK @ NS # 718270L LUMP SUM PROJECT
FUND: STP 010.00
OTH Share:
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$125,000 $100,000
$25,000
$100,000 $80,000 $20,000
PROJECT: 322550- TYPE WORK: WIDENING
FUND: STP
LENGTH (miles I km) 1.1 11.77
DESCRPT: SR 74 FM HOLSTUN DR TO KNIGHT TRAIL IN THOMASTON
EXIST. LANES: 02 PROPOSED LANES: 05
PE: 1993 ROW: 2003 CST:
UNDERWAY $350,000
AFTER 2003
PROJECT: 322920- TYPE WORK: INTERSECTION IMPROVEMENT
FUND: NHS
LENGTH (miles I km) 0.2/0.32
DESCRPT: SR 3IUS 19 AT CR 73/EAST AND WEST COUNTY ROAD IN THOMASTON
PE: 2001 ROW: 2002 CST: 2003 FED Share:
$10,000 $102,000 $288,000 $288,000
PROJECT: 322922- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 3/US 19 @ POTATO CREEK IN THOMASTON
FUND: BRIDGE 0.26 10.42
PE: 1999 ROW: 2003 CST:
UNDERWAY $50,000 .
AFTER 2003
PROJECT: 33280X- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles I km) 0 10.00
DESCRPT: SR 18/74/109 AT FIVE LOCATIONS SEE MERIWETHER PI 332800
EXIST. LANES: 02 PROPOSED LANES: 03
ASSOCIATED PROJECTS: 332800-
PE:NONE ROW: NONE CST: NONE
PROJECT: 33290X- TYPE WORK: PASSING LANES
FUND: STP
.LENGTH (mileslkm) 010.00
DESCRPT: PASSING LANES - 2 SITES/UPSON & 4/TALBOT/332900 & 0000929
EXIST. LANES: 02 PROPOSED LANES: 03
ASSOCIATED PROJECTS: 332900-
PE:NONE ROW: NONE CST: NONE
PROJECT: 343 I IX- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
LENGTH (miles I km) 0 10.00
DESCRPT: CR 172IPOBIDDY ROAD @ FLINT RIVER N OF .JCT SR 22fT ALBOT
ASSOCIATED PROJECTS: 343 I 10-
PE:NONE ROW: NONE CST: NONE
Page 315 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM 9/21/00
UPSON,COUNTY
PROJECT~ 371780- TYPE WORK: SIDEWALKS
I
LENGTH (miles / km)
DESCRPT: MULTI-USE SIDEWALKS IN THOMASTON
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
$275,000 $220,000
$55,000
Page316of336
----
---_._---
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
~
.......... .. '"'.~
"""'_~M""
~~
.. "'_-lC--..-
.,
...""_..-..
>_..,:
,_
WALKER COUNTY
PROJECT: 0000144 TYPE WORK: LANDSCAPING
CHAITANOOGA TMA TIP #
LENGTH (miles / km)
DESCRPT: ROSSVILLE-CHICKAMAUGA AVE STREETSCAPE
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$750,000 $600,000
OTHShare:
PROJECT: 62J61X- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles 1 km) 0 10.00
DESCRPT: SR IIUS 27 FM CR 331ITRION TO LAFA YElTE BYPISEE CHAlTOOGA
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 621610-
PE.NONE ROW: NONE CST: NONE
$150,000
PROJECT: 621650- TYPE WORK: PASSING LANES LENGTH (miles 1 km)
DESCRPT: SR 136 EB MP 21.4-22.8- 25.7-26.6IWB 4.12-5.22- 26.6-28.0 EXIST. LANES: 02 PROPOSED LANES: 03
FUND: STP 3.7/5.96
PE: 1992 ROW: 2002 CST:
UNDERWAY $450,000
AFTER 2003
PROJECT: 642250- TYPE WORK: WIDENING
FUND: NHS
CHAITANOOGA TMA TIP # NH-STP-98
LENGTH (miles / km) 5.04 /8.11
DESCRPT: SR 193 FM OLD SR 193 NORTH TO TENN STATE LINE & 64Y250 (STP)
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 64Y250-
PE: 2001 ROW: NONE CST:
$294,000
AFTER 2003
..\.\-
PROJECT: 671216- TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
LENGTH (miles 1 km} 010.00
DESCRPT: CHATTANOOGA CREEK GREENWAY MULII-USE TRAILS & BRIDGE REHAB
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTH Share:
PROJECT: 86YllO- TYPE WORK: PRELIMINARY ENGINEERING
FUND: HPP
CHAITANOOGA TMA TIP #
LENGTH (miles 1 km) 0/0.00
DESCRPT: TRANS ALT STUDY FM ATLANTA TO CHATTANOOGA(ROSSVILLE $)860110 PROPOSED TCM
ASSOCIATED PROJECTS: 860 110-
PE:2001 ROW: NONE CST: NONE
:!
$100,000 $80,000
$20,000 $500,000
Page 317 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
_ _ _ _ _ _ _ _ _ _ _ _ _ _ , . . " . . f ' _ J I : l '_ _ "'
9/21/00
~_... ,_,
_ _. < ~ _ .
_
WALTO,N COUNTY
PROJECT~, 0000171 TYPE WORK: LANDSCAPING
FUND: STP
PE: LOCL
I
LENGTH (miles/km) 0/0.00
ROW: LOCL
I DESCRPT~ MONROE-BROAD STfGA HWY II CORRIDOR STREETSCAPE IMPROVEMENTS
CST: 200 I
FED Share:
I
I
I
PROJECT: 0000412 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
LENGTH (miles / km) 0.2'/0.32
DESCRPT: SR 10178 @ SPRING STfSR lOBUS-ADD WB RAMPSfUPGRD INTERCHNGE
OTH Share:
PE: 2003 ROW: CST:
$606,000 $485,000
$121,000
$869,000 AFTER 2003 AFTER 2003
I
I
I
PROJECT: 0000417
iI
TYPE WORK:
REALIGNMENT LENGTH (miles / km)
FUND: STP 1.1 / 1.77
DESCRPT': SR II & MADISON RD 1-WAY BET MILL ST & MARBLE ST IN MONROE
i
PE: 2003 ROW: CST:
$449,000 AFTER 2003 AFTER 2003
PROJECn 132980- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT:, SR II @ CSX RAILROAD IN SOUTH SOCIAL CIRCLE
FUND: BRIDGE 0.23/0.37
PE: 1999 ROW; 2002 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT:; 132981- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
I
LENGTH (miles / km) 0.24 /0.39
DESCRPT:: SR II @APALACHEERIVER 7.5 MI NORTH OF MONROE
PE: 1999 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
I
PROJECT:' 132982- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
I
LENGTH (miles / km) 0.28/0.45
DESCRPT:: SR IOfUS 78 WBL @APALACHEERIVER4 MI E OF GRATIS
I
PE: 1999 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT:, 132983- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles/km) 0.24/0.39
DESCRPT:: SR lOBUS WBL @ SR 10 EBL (US 78) 2 MI WEST OF MONROE
i
PE: 1999 ROW: 2002 CST:
UNDERWAY $10,000
AFTER 2003
I
.
PROJECT: I 142000- TYPE WORK: PASSING LANES
I
LENGTH (miles / km)
FUND: STP 2.5 /4.03
PE: 1999 ROW; 2003
UNDERWAY $165,000
v
DESCRPT:; SR 20- 4-INTERS & 2-PASSING LN FM ROCKDALE CL TO LOGANVILLE EXIST. LANES: 02 PROPOSED LANES: 03
I
i
CST: 2003 FED Share:
GA Share:
$880,000 $704,000 $176,000
Page 318 of336
STATE TRANSPORTATION IMPROVEMEN,T PROGRAM
9/21/00
WALTON COUNTY
PROJECT: 142295- TYPE WORK:, REPLACE BRIDGE I LENGTH (miles / km)
DESCRPT: SR 81 @ ALCOVY RIVER 2 MI SW OF BOLD SPRINGS
FUND: BRIDGE 0.23/0.37
PE: 2001 ROW: CST:
$20,000 ....
AFTER 2003 AFTER 2003
PROJECT: 171170- TYPE WORK: REPLACE BRIDGE .
FUND,: BRIDGE
PE: )995
LENGTH (miles / km) 0.2/0.32
ROW: LOCL
. DESCRPT: CR 289/BEARDEN ROAD @ JACKS CREEK 1.2 MI NW OF GOOD HOPE
CST: 200)
FED Share:
GA Share:
UNDERWAY
$470,000 $376,000
$94,000
PROJECT: 21088X- TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: 1-20 SAFETY UPGRADES @ 2 LOC NEWT9N/ I LOqSEE NEWTON 210880
ASSOCIATED PROJECTS: 210880-
PE:NONE ROW: NONE CST: NONE
Page 319 of336
STATE TRANSPORTATION iMPROVEMENTPROGRAM
WAR~hOUNTY
.._._----- 9/21/00
----._--------_.,-~_._--_._
I
PROJEC1i.: 0001219 TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2002
$40,000
LENGTH (miles I km) 0.22/0.35
I
DESCRP1(: SR 4IUS 1 @ DRYDEN CREEK 5 MI N OF WAYCROSS
ROW: NONE CST:
AFTER 2003
I
I
I
I
PROJECT: 422125- TYPE WORK: BRIDGE REHAB
i
LENGTH (miles I km)
FUND: BRIDGE' 0.1/0.16
PE: 1995 ROW: NONE
DESCRPT;: SR 38/US 84 @ SUWANNEE CRK
CST: 2003
EXIST. L~NES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 422 I20I i I
PROJECT: 42212X- TYPE WORK:
iI
WIDENING
LENGTH (miles rkm)
GA Share:
FUND: STATE .010.00
PE:NONE ROW: NONE
DESCRPT,: SR 38 FM WEST OF WOODYARD CK TO W OF GREASY CK /422120
CST: NONE
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 422120-
UNDERWAY
$138,000 $110,400
$27,600
I
PROJECT~ 521530- TYPE WORK: WIDENING
I
:
LENGTH (miles I km)
FUND:NHS 1.3 12.09
I
DESCRPT: SR 4BU/USI/WAYCROSS FM N/BLACKSHEAR AV TO CR I44/AI RPORT RD
EXIST. L~NES: 02 PROPOSED LANES: 05
0.:[
i
I ,
PE: 1992 ROW: 2003 CST:
UNDERWAY $2,000,000 AFTER 2003
I
PROJECT} 522060- TYPE WORK: RAMP I ,
FUND: STATE LENGTH (miles I km) 0.1/0.16
PE: 1995 ROW: 2001
UNDERWAY $20,000
DESCRPr': US82/84 CONN. FM CORRIDOR Z TO US 84/FRANCIS ST. ,
EXIST. LANES: 04 PROPOSED LANES: 05 I
I
CST: 2002 GA Share:
$140,000 $140,000
i
PROJECT.~ 522400- TYPE WORK: WIDENING
i
.
LENGTH (miles I km)
FUND: STATE 9.3 114.97
DESCRPT~ SR 4IUS I FM WAYCROSS BYP @ CR 152 TO BACON COUNTY LINE
EXIST. LANES: 02 PROPOSED LANES: 04 !
I
PE: 1993 ROW: 2001 CST:
UNDERWAY $3,850,000 AFTER 2003
i
PROJECT: 522770- TYPE WORK: WIDENING j
LENGTH (mileslkm)
FUND: STATE 8.7/14.01
PE: 1994 ROW: 2002
UNDERWAY $1,250,000
DESCRPT:; SR 38IUS 84 FM 900 FT W OF GREASY BRANCH CK TO CR 79/NEEDHAM
CST:
AFTER 2003
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIAljED PROJECTS: 522775-
I
i
PROJECT:! 522780- TYPE WORK: WIDENING
FUND: HPP
PE: 1994
UNDERWAY
I
LENGTH (mileslkm) 4.817.73
ROW: 2001
$4,285,000
DESCRPT:: SR 38/US 84 FM CR 79/NEEDHAM RD TO SR 38 @ SR50lUS82
'.
EXIST. LANES: 02 PROPOSED LANES: 04
I
ASSOCIATED PROJECTS: 52Y780
I
I
I
I
I,
CST: 2003 FED Share:
GA Share:
$4,916,000 $3,932,800
$983,200
Page 320 of336
~. 'r .:. ~
STATE TRANSPORTATioNiMPROVEMENTPROGRAM
9/21/00
I
WARE CQUNTY
I PROJECT: b3255- TYPE WORK: TURN LANES
FUND: NHS
t
LENGTH (miles / km) 21.4 /34.44
DESCRPT: ,SR 4 TURN LANES FM LUCY MOORE RD TO HAVANNA AVE
I I
PE: 1999 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$5,005,000 $4,004,000 $1,001,000
PROJECT: '52Y780- TYPE WORK: WIDENING
FUND: STATE
I
~ENGTH (miles / km) 6.2/9.98
s DESCRPT:,SR 38/US 84 FM CR"79 TO EXISTING 5-LN @ SR 4 N. -FOR EDS
EXIST. LAN,ES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 522780-
I
.
PE: 1994 ROW: NONE CST: 2003
GA Share:
PROJECT: 1571420- TYPE WORK: HISTORIC PRESERVATION
I
LENGTH (miles / km)
DESCRPT: ,REHABILITATION OF WAYCROSS DEPOT - PHASE II
I
"
I'
FUND:STP 0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
UNDERWAY $3,703,000 $3,703,000
$986,000 $789,000 $197,000
Page 321 of336
STATE TRANSPORTATION IMPROVEMENTPROGRAM
_
...... _ ..._ _ .... ..... Qa'"-~""".r
"
9/21/00
,,,_'
u'
...._. "
_
WARREN COUNTY
PROJECT: 210930- TYPE WORK: INTERCHANGE LENGTH (mileslkm)
'DESCRPT: 1-20 SAFETY UPGRADES @ SR 12; NORWOOD & SR 80
FUND: 1M 0.6/0.97
PE: 1998 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$6,900,000
$6,210,000
~
$690,000
PROJECT: 221620- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE.
PE:1991
LENGTH (miles I km) 0.56/0.90
ROW: 2000
DESCRPT: SR 17@REEDY CK {FM SR 296/MP 0.18 TO MP 0.74}RDWY $=22Y620
CST: 2001
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
ASSOCIATED PROJECTS: 22Y620-
G!! Share:
. UNDERWAY UNDERWAY
$506,000 $404,800 $101,200
PROJECT: 22Y620-TYPE WORK: REPLACE BRIDGE
FUND:NHS
LENGTH (mileslkm) 010.00
DESCRPT: SR 17 @ REEDY CK {FM SR 296/MP O. I8 TO MP 0.74}BRDG $=22 1620
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 221620-
PE: 1991 ROW: NONE CST: 2001 FED Share: GA Share:
UNDERWAY
$1,700,000 $1,360,000
$340,000
PROJECT: 232220- TYPE WORK: RR XING
FUND: STP
PE: 1999
LENGTH (miles I km) 0.4/0.64
ROW: 2001
DESCRPT: SR 12/E WARRENTON @ SOUTHERN RR BRIDIREMOVE & REPL WI@-GRADE
CST: 2003
EXIST. LANES: 02 PROPOSED LANES: 04
FED Share:
GA Share:
UNDERWAY $50,000
$751,000 $600,800
. $150,200 .',.
Page 322 of336
_ _ _-+-
STATE TRANSPORTATION IMPROVEMENT PROGRAM
.
... 9/21/00 ~'~_~~'r"#',.T.
. . __. ..,..~~I_
~ ~
_
I
WASHINGTON COUNTY I
I PROJECT: 0000418 TYPE WORK:
MEDIAN WORK LENGTH (miles/km)
FUND: STP 0.1/0.16
PE: 2001 ROW:
$57,000 AFTER 2003
DESCRPT: SR 15 SOUTH IN THE CITY OF SANDERSVILLE
CST:
AFTER 2003
PROJECT: 0001121 TYPE WORK: RR XING
FUND: STP
I
LENGTH (miles / km} 0/0.00
DESCRPT: CR I 26/SUN HILL GRANGE RD IN TENNILLE @NS# 732747Y I
LUMP SUM PROJECT
PE:NONE ROW:NONE CST: 2001 FED Share: GA Share:
$100,000 $80,000 $20,000
PROJECT: 220545- TYPE WORK: WIDENING
FUND: STATE
I
LENGTH (miles / km) 0.8 / 1.29
DESCRPP: SR 15 FM 800 FT S OF MATTHEWS RDffENNILLE TO WACO RD
EXIST. d.NES: 04 PROPOSED LANES: 05
PE:NONE ROW: 2001 CST: 2002
GA Share:
$382,000 $1,454,000
$1,454,000
I PROJECP: 22219X- TYPE WORK: PASSING LANES LENGTH (miles / km)
FUND: STP 0/0.00
DESCRPi: SR 15 @ 3 LOC BTWN WRIGHTSVILLE & TENNILLE/ SEE JOHNSON CO
ASSOCIArD PROJECfS, 222190-
PE:NONE ROW: NONE CST: NONE
PROJECP: 222285- TYPE WORK: WIDENING
I
LENGTH (miles / km)
DESCRPT!: SR 24/SR 540 FM CR IO TO JUST WEST OF SR 68 I
EXIST. LANES: 02 PROPOSED LANES: 04
FUND: NHS 8 / 12.88
PE: 1996 ROW: 2002 CST: 2003 FED Share: GA Share:
UNDERWAY $1,606,000 $12,863,000 $ I0,290,400 $2,572,600
PROJECP: 22228X- TYPE WORK: WIDENING
I
LENGTH (miles / km)
FUND: HPP 0 /0.00
DESCRP1{: SR 24/SR 540 FM SOUTH OF CR 186 TO CR 10; SEE BALDWIN CO
I
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATED PROJECTS: 222280-
PE:NONE ROW: NONE CST: NONE
I
PROJECT!: 222290-
I
TYPE WORK:
WIDENING LENGTH (miles / km)
FUND: STATE 12.2 / 19.64
DESCRP1j: SR 88/SR 540 FR W OF CR 106 TO SR 171 IN JEFFERSON CO & Y
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIA!'D PROJECTS, 22229X- 22Y290-
PE: 1993 ROW: 1999 CST: 2002
GA Share:
UNDERWAY UNDERWAY $21,099,000
$21,099,000
PROJEC1I.1: 22Y290- TYPE WORK: WIDENING
FUND: BRIDGE
PE:NONE
LENGTH (miles / km) 0/0.00
ROW: NONE
DESCRP~: SR 88/SR 540 BRIDGES AT WILLIAMSON; OGEECHEE & OVERFLOW
CST: 2002
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCJAlfED PROJECTS: 222290-
FED Share: GA Share:
$2,800,000 $2,240,000
$560,000
Page 323 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
__________ .
.,rt
*,, 9/21, /00 * _ _
._.
_
WASHINGTON COUNTY
PROJECT: 231240- TYPE WORK: PASSING LANES
FUND: STP
LENGTH (miles / km) . 2.6/4.19
DESCRPT: SR 24 BET SANDERS'LE & DAVISBORO EB MP 14.3-13.4IWB 5.3-7.0
EXIST. LANES: 02 PROPOSED LANES: 03
ASSOCIATED PROJECTS: 245140-
PE: 1997 ROW: 200i CST: .
UNDERWAY $15,000
AFTER 2003
PROJECT: 245140- TYPE WORK: .REPLACE BRIDGE
FUND: BRIDGE
,
' LENGTH (miles / km) 0.25/0.40
DESCRPT: SR 24 OVER WILLIAMSON SWAMP CREEK 1.3 MILES NW OF DAVISBORO
ASSOCIATED PROJECTS: 231240-
PE: 1997 ROW: 2001 CST:
UNDERWAY $5,000
AFTER 2003
PROJECT: 262480- TYPE WORK: . MINOR WIDEN & RESURF
FUND: STP
,
LENGTH (miles / km) 0.6/0.97
DESCRPT: SR 24 REL ALONG CR 67 FM SR 24 N TO SR 540/FALL LINE FWY
PE: 1997 ROW: 2001 CST:
UNDERWAY $22,000
AFTER 2003
Page 324 of336
I
I
STATE TRANSPORTATION IMPROVEMENT PROGRAM
I
9/21/00
.I
WAYNE COUNTY
I
PROJECT: 0000078 TYPE WORK: BICYCLE/PED. FACILITY
FUND: STP
f
LENGTH (miles / km) 0/0.00
DESCRPTi JESUP CORRIDOR ENHANCEMENTS AND RR & BUS DEPOT REHAB.
PE: LOCL ROW: LOCL CST: 2001 FED Share:
I
PROJECT: 52234X- TYPE WORK: WIDENING
i
LENGTH (miles / km)
OTH Share:
FUND: STATE 0/0.00
PE:NONE ROW: NONE
DESCRP'P: SR 38/US84 FM CR 107/0FFERMAN TO S. CITY LMTS SCREVEN/PIERCE
CST: NONE
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATED PROJECTS: 522340-
I
I
PROJECT: 522380- TYPE WORK: WIDENING
I
LENGTH (miles/km)
FUND: STATE 6.71/10.80
PE: 1994 ROW: 2001
DESCRP'P: SR 38IUS 84 FM SOUTH CITY LIMITS OF SCREVEN TO SR 203
CST:
EXIST. LANES: 02 PROPOSED LANES: 04
$500,000 $400,000 $100,000
UNDERWAY $2,214,000 AFTER 2003
PROJECT: 522390- TYPE WORK: WIDENING
I.
LENGTH (miles / km)
DESCRP'P: SR 38/US 84 FM SR 203 TO CR 392 AT JESUP
EXIST. LANES: 02 PROPOSED LANES: 04
[.
FUND: STATE 5.13 /8.26
PE: 1994 ROW: 2003 CST:
I
PROJECT: 522410- TYPE WORK: WIDENING
i
LENGTH (miles / km)
DESCRP'P: SR 27/US 341 FM E CL OF ODUM E TO CR 115
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATED PROJECTS: 522420-
I
I
I PROJECT: 522420-
TYPE WORK:
WIDENING LENGTH (miles / km)
DESCRPT: SR 27/US 341 FM CR 115 TO WEST OF CL OF JESUP
EXIST. LANES: 02 PROPOSED LANES: 04
I
.
ASSOCIAjD PROJECTS' 522410-
FUND: STATE 1.88/3.03
FUND: STATE 5.17/8.32
PE: 1993 ROW: 1997 CST: 2001
GA Share:
PE: 1993 ROW: 1997
~.
CST: 2001
GA Share:
UNDERWAY $3,825,000 AFTER 2003
UNDERWAY UNDERWAY
$2,853,000 $2,853,000
UNDERWAY UNDERWAY $7,653,000 $7,653,000
I PROJECT: 522450- TYPE WORK: WIDENING LENGTH (miles / km) DESCRPT: SR 27IUS 341 FM CR 260 TO GLYNN COUNTY LINE EXIST. LANES: 02 PROPOSED LANES: 04
FUND: STATE 9.8/15.78
PE: 1993 ROW: 1998 CST: 2001
GA Share:
UNDERWAY UNDERWAY $16,047,000
$16,047,000
PROJECT: 52258X- TYPE WORK: WIDENING
I
LENGTH (miles / km)
FUND: STATE 0/0.00
DESCRPT: SR 27IUS 341 FM CL SURRENCY TO WEST CL@ODUM/SEEAPPLING
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATED PROJECTS: 522580-
PE:NONE ROW: NONE CST: NONE
Page 325 of336
. _,= I--====::~~~~~'"_.,.~,.,=-..-=- ~,'~,~,~.~~==~~===~~~~~~-
__. _ - STATE TRANSPORTA,TION IklPROVEMENT PROGRAM 9/21/00
... --...;...--------------~----------------_
WAYNE, COUNTY
PROJECT: 542425-TYPE WORK: REPLACE BRIDGE
,I
'
LENGTH (miles I km)
DESCRPT: 'SR 203 @ REEDY CREEK 1.1 MI E OF APPLING CO LINE
FUND: BRIDGE 0:22 10.35
. PE: 2001 ROW: , CST:
$20,000 AFTER 2003 AFTER 2003
.. !.
"
','
.,
"
Page 326 of336
---+--
._ _ .. ,;.;. ....:.:.;....~.;._._-_ .=.:-..._;....;.-----------------
STATE TRANSPORTATION IMPROVEMENT PROGRAM
0_.'_..
9121100 __ __.
,.~.
~
o
_
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT:
TYPE WORK: REPLACE BRIDGE
LENGTH (miles I km)
DESCRPT:13S4R33 416 @ 0- BEAR CREEK 1.8 Ml N OF WESTON
FUND: BRIDGE 0.21 10.34
PE: 1999. ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT:, 343361- TYPE WORK: REPLACE BRIDGE
I
LENGTH (miles I km)
DESCRPT: SR 41 @KINCHAFOONEECREEKIN SW PRESTON
FUND: BRIDGE 0.26 10.42
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT) 343362- TYPE WORK: REPLACE BRIDGE
I
LENGTH (miles I km)
DESCRPT: SR 153 @ LANAHASSEE CREEK 3.5 MI NE OF PRESTON
FUND: BRIDGE 0.23/0.37
PE: 1999 . ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
-'
PROJECT: .343363- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
I1
LENGTH (mileslkm) 0.2310.37
DESCRPT~ SR 45 @ KINCHAFOONEE CREEK OfF .2 MI S OF SUMTER CO LINE
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
PROJECT) 343364- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
I
LENGTH (miles I km) 0.27 10.43
DESCRPT: SR 45 @ KINCHAFOONEE CREEK .1 MI W OF SUMTER CO LINE
I.
-
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
Page 327 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
'--------------_._-~-_._--_._--------._------
WHEELER COUNTY
PROJECT: 0000133 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: GLENWOOD DOWNTOWN PARK
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
$25,000 $20,000
OTHShare:
PROjECT: 0001220 "TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km). 0.23/0.37
DESCRPT: SR 31/US 319/US 441 @CSX RAILROAD (635193G) NEAR MCRAE
EXIST. LANES: 02 PROPOSED LANES: 04
PE: 2002 ROW: NONE , CST: "
$5,000 $50,000 AFTER 2003
PROJECT: 262061- TYPE WORK: WIDENING
FUND:NHS'
.
LENGTH (miles / km) 11.5 /18.52
DESCRPT: SR 311US 441 FM N/CR 132 THRU DODGE TO SR 46/LAURENS
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 26206X- 26Y061-
PE: 1992 ROW: 2002 CST:
UNDERWAY $3,512,000 AFTER 2003
PROJECT: 531250- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 46 AT OCONEE RIVER
FUND: BRIDGE
PE: 1991
0.2/0.32
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY $25,000
$15,000,000 $12,000,000 $3,000,000
PROJECT: 533150- TYPE WORK: REPLACE BRIDGE
' FUND: BRIDGE
PE: 1999
.
LENGTH (miles / km) 0.23/0.37
ROW: 2001
DESCRPT: SR 30mS 280 @ OCHWALKEE CREEK I MI E OF GLENWOOD
CST:2001 .:
FED Share:
GAShare:
UNDERWAY $10,000
$953,000 $762,400 $190,600
PROJECT: 542 i 00- TYPE WORK: I REPLACE BRIDGE
LENGTH (miles / km) DESCRPT: SR 19 @ OCHWALKEE CREEK I MIN OF GLENWOOD '
FUND: BRIDGE
PE: 1997
0.5/0.81
ROW: 2001
CST: 2002
FED Share:
GA Share:
UNDERWAY $10,000
$1,008,000 $806,400 $201,600
PROJECT: 56147X- TYPE WORK: NEW CONSTRUCTION
FUND: STATE
LENGTH (miles/km) 0/0.00
DESCRPT: N MCRAE BYP FM US 341/S BYPTO US 441/TELFAIR/INCL SIGNALS
ASSOCIATED PROJECTS: 561470-
PE:NONE ROW: NONE CST: NONE
Page 328 of336
----+----------_.__._-_ _-_ _ .
STATE TRANSPORTATION IMPROVEMENT PROGRAM
- 'WHITE bo~::
----- 9121100 ----_._--_.-----
PROJECT) 0000146 TYPE WORK: BICYCLE/PED. FACILITY
I
LENGTH (miles / km)
DESCRPT: HELEN - MAIN STREET BRIDGE WALKWAY/UNDERPASS
I
.
FUND: STP 0/0.00
PE:LOCL ROW: LOCL CST: 2001 FED Share:
$20,000 $16,000
PROJECT:: 122130- TYPE WORK: WIDENING
I
LENGTH (miles / km)
DESCRPT) SR 75 FM SR 75 ALT/CLEVELAND NE TO CR 88 I
EXIST. LANES: 02 PROPOSED LANES: 03
FUND: STP 2.21/3.56
OTH Share:
PE: 1999 ROW: 2002 CST:
$4,000
UNDERWAY $42,000
AFTER 2003
PROJECT:,132560- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1996
LENGTH (miles / km) 0.23 /0.37
ROW: 2001
DESCRPT.! SR 115 @ CHAITAHOOCHEE RIV 7.5 MI E. OF CLEVELAND/HABERSHAM
I
.
ASSOCIAFED PROJECTS: 13256X-
I
I
CST: 2002 FED Share:
GA Share:
PROJECT) 141830- TYPE WORK: PASSING LANES
FUND: STP
I
LENGTH (miles / km) 7.32/11.79
DESCRPT.; SR 384/DUNCAN BRIDGE RD FM W OF SR 115 TO SR 75 (8 LOCATIONS
PE: 2002 ROW: CST:
EXIST. LTES' 02 PROPOSED LANES, OJ
UNDERWAY $20,000
$818,000 $654,400 $163,600
$140,000
AFTER zcm
AFTER 2003
I
117088 PROJECT :
I- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
LENGTH (miles / km) 0.1 /0.16
PE: 1993 ROW: LOCL
DESCRPT.1 CS 613ILORELY RD OVER CHAITAHOOCHEE RIVER IN HELEN
I
I
I
CST: 2001 FEDShllre:
GA Share:
UNDERWAY
$306,000 $244,800
$61,200
Page 329 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
_.- - - - - - - - - 9/21/00
,--~""--~,.....-"''''''-~=''''----------,_._.
WHITFIELD COUNTY
PROJECT: 0000147 'TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: TUNNEL HILL W&A RAILROAD TUNNEL PHASE 2
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: 0000931 TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles / km) 0.72 / 1.16
DESCRPT: 1-75 @SR3IUS41/ROCKY FACE EXIT - PHASE 2 WIDENING
EXIST. LANES: 04 PROPOSED LANES: 06
OTHShare:
PE: 1994 ROW: 2001 CST:
$313,000 $250,000
$63,000
UNDERWAY $600,000
AFTER 2003
PROJECT: 610760- TYPE WORK: TURN LANES
FUND: 1M
LENGTH (miles / km) 0.4/0.64
DESCRPT: 1-75 @SR3/US41/ROCKYFACE-RAMPWORK; TURN LANE; SIGNAL
PE: 1994 ROW: NONE CST:'2001 FED Share: GA Share:
UNDERWAY
$231,000 $207,900
$23,100
PROJECT: 610890- TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles / km) 1.24/2.00
DESCRPT: 1-75 INTERCHANGE AT CARBONDALE ROAD/CR 665/SEE 61Y890
ASSOCIATED PROJECTS: 61Y890-
PE: 1995 ROW: 2001 CST:
UNDERWAY $3,257,000 AFTER 2003
PROJECT: 611280~ TYPE WORK: BRIDGE PAINTING LENGTH (miles / km)
DESCRPT: BRIDGE PAINTING IN WHITFIELD COUNTY/61Y280 LUMP SUM PROJECT ASSOCIATED PROJECTS: 61Y280-
FUND: 1M 0/0.00
PE:~ONE . ROW: NONE CST: 2001 FED Share: GA Share:
$401,000 $360,900
$40,100
PROJECT: 61131X- TYPE WORK: INTERCHANGE
FUND: 1M
LENGTH (miles / km) 0/0.00
DESCRPT: I-59 @ 3 LOQI-24 @ 111-75 @ 4/WHITFIELD/CATOOSA--6 11310IXIZ
ASSOCIATED PROJECTS: 611310-
PE:NONE ROW: NONE CST: NONE
PROJECT: 61Y280- TYPE WORK: BRIDGE PAINTING LENGTH (miles / km)
DESCRPT: BRIDGE PAINTING IN WHITFIELD COUNTY/611280 LUMP SUM PROJECT ASSOCIATED PROJECTS: 611280-
FUND: STP 0/0.00
PE: NONE ROW: NONE CST: 2001 FED Share: GA Share:
$326,000 $260,800
$65,200
PROJECT: 61Y890- TYPE WORK: INTERCHANGE
FUND: STP
LENGTH (miles / km) 0 /0.00
DESCRPT: 1-75 INTERCHANGE AT CARBONDALE ROADICR 665/SEE 610890
ASSOCIATED PROJECTS: 610890-
PE: 1995 ROW: 2001 CST:
UNDERWAY $3,300,000 . AFTER 2003
Page 330 of336
- - - - ' - - - - - - - _ _ __ __._ _ _._ .
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
I
WHITFI~LD COUNTY
PROJECT: 1622115- TYPE WORK: ATMS/ITS LENGTH (miles / km)
DESCRPT: ATMS/ DALTON SLO SCAN/CMS/RADAR
FUND: NHS 0/0.00
PE: NONE ROW:NONE' CST: 2001 FED Share: GA Share:
$1,650,000 $1,320,000
$330,000
PROJECT: jM000436 TYPE WORK: BRIDGES
i
LENGTH (miles / km)
FUND: NHS 0/0.00
DESCRPT: IDECK REPLACEMENTIREHAB @ SEVERAL LOC IN WHITFIELD CO/PE ONLY
LUMP SUM PROJECT
PE: 2001 ROW: NONE CST: NONE
$40,000
Page 331 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
WILCOX COUNTY
PROJECT: 0000134 TYPE WORK: LANDSCAPING LENGTH (miles / km)
DESCRPT: PINEVIEW CABOOSE PARK
FUND: STP 0/0.00
. PE: LOCL ROW: LOCL CST: 2001 FED Share:
OTHShare:
PROJECT: 431690- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1997
LENGTH (miles / km) 0.21 /0.34
ROW: 2000
DESCRPT: SR 30/US 280 @ALAPAHA RIVER TRIB. 0.7 MI W OF PITTS
CST: 2001
FED Share:
ASSOCIATED PROJECTS: 43 I695-
GA Share:
$49,000 $39,000
$10,000
UNDERWAY UNDERWAY
$775,000 $620,000 $155,000
PROJE, CT: 431695- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 30/US 280 @ALAPAHA RIVER 1.2 MI W OF PITTS
ASSOCIATED PROJECTS: 431690-
FUND: BRIDGE
PE: 1997
0.22 /0.35
ROW: 2000
CST: 2001
FED Share:
GA Share:
UNDERWAY UNDERWAY
$700,000 $560,000 $140,000
PROJECT: 432070- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1999
LENGTH (miles / km) 0.26 /0.42
ROW: 2002
DESCRPT: SR 30/US 280 @ALAPAHA RIVER TRIB. 0.8 MI E OF SEVILLE
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$825,000 $660,000 $165,000
PROJECT: 432075- TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 2000
LENGTH (miles / km) 0.29/0.47
ROW: 2002
DESCRPT: SR 30/US 280 @ ALAPAHA RIVER TRIB. 1.3 MI E OF SEVILLE
CST: 2003
FED Share:
GA Share:
UNDERWAY $10,000
$650,000 $520,000 $130,000
Page 332 of336
STATE TRANSPORTAiioN IMPROVEMENT PROGRAM
--'" ,._9/2-1/-00--_._---
I
WILKES COUNTY
I PROJECT} 221740- TYPE WORK: WIDENING LENGTH (miles / km)
FUND: STATE 7/11.27
PE: 1993 ROW: 2002
DESCRPT: SR 17 FM MP 13.0-16.71IMP 23.88-26.28/INCL 3-CLVTS & BRDG I
. EXIST. LANES: 02 PROPOSED LANES: 04
CST:
'UNDERWAY $300,000
AFTER 2003
I PROJECT: 22225X- TYPE WORK: WIDENING LENGTH (miles / km)
FUND: STATE 0/0.00
DESCRPT: SR 17/10 FM CR 6/SMITH MILL RD TO WASHINGTON BYPASS/WILKES I
EXIST. LANES: 02 PROPOSED LANES: 05 I
ASSOCIATED PROJECTS: 222255-
I
I
PROJECT) 22Y260- TYPE WORK: WIDENING
.
I
LENGTH (miles / km)
FUND: NHS 0/0.00
DESCRPT: SR 17 FM N WASHINGTON BYP TO CR 193 - FOR FED PE; 222260 I
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATED PROJECTS: 222260-
PE:NONE ROW: NONE CST: NONE
PE:2001 ROW: NONE CST: NONE
$1,000
PROJECTJ 22Y264" TYPE WORK, WIDENING
I
LENGTH (miles / km)
FUND, NHS 0/0.00
DESCRPT: SR 17 FROM CR 113 TO NO.OF CR 50/ELBERT - FOR FED PE; 222264
I
EXIST. LANES: 02 PROPOSED LANES: 04 I
ASSOCIATiED PROJECTS: 222264-
PE: 2001 ROW: NONE . CST:NONE
$1,000
I PROJECT: 232300- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km) DESCRPT: SR 44 @ KETTLE CREEK 6.5 MI SW OF WASHINGTON
FUND: BRIDGE 0.24/0.39
1
I
PROJECT:! 245385- TYPE WORK: REPLACE BRIDGE
I
LENGTH (miles I km)
DESCRPT:' SR 44 @ FISHING CREEK 5 MI NE OF WASHINGTON
FUND: BRIDGE 0.22/0.35
PE: 1999 ROW: 2003 CST:
PE: 1999 ROW: 2003 CST:
UNDERWAY $10,000
AFTER 2003
UNDERWAY $10,000
AFTER 2003
Page 333 of336
STATE TRANSPORTATION IMPROVEMENT PROGRAM
9/21/00
WILKINSON COUNTY
PROJECT: . 0001118 TYPE WORK: RR 'XING LENGTH (miles I km)'
DESCRPT: CS 665/JACKSON ST IN GORDON @NS# 732714L LUMP SUM PROJECT
FUND:STP .0/0.00
PE.NONE ROW: NONE CST: 2001 FED Share: GA Share:
$100,000 $80,000 $20,000
PROJECT: 0001119 TYPE WORK: RR XING LENGTH (miles I km)
DESCRPT: CS 695/MILLER AVE IN GORDON @ NS # 732717G LUMP SUM PROJECT
'FUND:STP 0/0.00
PE:NONE ROW: NONE CST: 2001 FED Share: . GA Share:
$100,000 $80,000 $20,000
PROJECT: 0001120 TYPE WORK: RR XING LENGTH (miles/ km)
DESCRPT: CR 60/CLA YFIELD RD IN GORDON @ NS # 732720P LUMP SUM PROJECT
FUND:STP 0/0.00
PE:NONE ROW: NONE CST: 2001 FED Share: GA Share:
$100,000 $80,000 $20,000
PROJECT: 0001122 TYPE WORK: RR XING
FUND: STP
LENGTH (miles I km) 0 10.00
DESCRPT: CR 183/GORDON/MCINTYRE RD IN GORDON @ NS # 732998T
LUMP SUM PROJECT
PE:NONE ROW: NONE CST:)OOI FED Sit are: GA Share:
$100,000 $80,000 $20,000
PROJECT: 221762- TYPE WORK: REPLACE BRIDGE LENGTH (miles I km)
DESCRPT: SR 29/US 441 @ BIG SANDY CREEK S OF IRWINTON EXIST. LANES: 02 PROPOSED LANES: 04 .
FUND: BRIDGE
PE: 1992
I 11.61
ROW: 2001
CST: 2001
FED Share:
GA Share:
UNDERWAY $250,000
$3,750,000 $3,000,000
$750,000
PROJECT: 221766- TYPE WORK: WIDENING
FUND: STATE
LENGTH (miles I km) 4.4717.20
DESCRPT: SR 29IUS 441 FM S OF SR 96 TO THE IRWINTON BYPASS NEAR CR 8 I
EXIST. LANES: 02 PROPOSED LANES: 04
PE:NONE ROW: 1995 CST: 2001
GA Share:
UNDERWAY $6,403,000
) $6,403,000
PROJECT: 221870- TYPE WORK: NEW CONSTRUCTION
FUND: HPP
LENGTH (miles I km) 7 I 11.27
DESCRPT: FALL LINE FWYINORTH GORDON BYPASS FM SR 57 TO SR 243 @ LAKE
EXIST. LANES: 00 PROPOSED LANES: 04
PE: 1992 . ROW: 2001
CST: 2001 FED Share:
GA Share:
UNDERWAY
$2,250,000
$22,700,000
s18, I 60,000
$4,540,000
PROJECT: 222220- TYPE WORK: BRIDGE REHAB
FUND: BRIDGE
LENGTH (miles I km) 0.84 I 1.35
DESCRPT: SR 57 OVER THE OCONEE RIVER AT WASHINGTON COiJNTY LINE
EXIST. LANES: 02 PROPOSED LANES: 03
PE: 1998 ROW: 2001 CST:
UNDERWAY $21,000
AFTER 2003
Page 334 0/336
----;--------_.._ _ -- -
_
.
STATE TRANSPORTATION IMPROVEMENTPROGRAM
----!-----_..=--.,_.=------_._-,9-/-2_1./.0_0 --_._--------------
I
WILKINSiON COUNTY
PROJECT: 23143X- TYPE WORK: WIDENING
I
LENGTH (miles / km)
FUND: STATE 0/0.00
PE:NONE ROW: NONE
DESCRPT: SR29/US441 FROMCR471 TOSR 112/LAURENS-231430 I
EXIST. LANES: 02 PROPOSED LANES: 04 1
ASSOCIATr PROJECTS' 23 '430-
CST: NONE
PROJECT: 262470- . TYPE WORK: NEW CONSTRUCTION
FUND: STATE
I
LENGTH (miles / km) 7.9/12.72
I
DESCRPT: FALL LINE FWY ON NEW LOC FM SR 243 @ MORNINGSIDE TO US 441
I
EXIST. LANES: 02 PROPOSED LANES: 04
I
ASSOCIATED PROJECTS: 26247X- 26Y470-
I
PE: 1993 ROW: 2001 CST:
1
I PROJECT: 271298- TYPE WORK: HISTORIC PRESERVATION LENGTH (miles / km) DESCRPT: tITY OF GORDON RAILROAD DEPOT REHAB
FUND: STP 0/0.00
PE: LOCL ROW: LOCL CST: 2001 FED Share:
PROJECT: [34298X- TYPE WORK: PASSING LANES
I
LENGTH (miles / km}
DESCRPT: SR 18 WB MP 2.31-3.61 EB MP 7.0-8.5 /SEE TWIGGS-342980
I
.
ASSOCIATED PROJECTS: 342980-
FUND: STP 0/0.00
OTHShare:
PE:NONE ROW: NONE CST: NONE
UNDERWAY $1,800,000 AFTER 2003
$135,000 $108,000 $27,000
1
PROJECT: [343082- TYPE WORK: PASSING LANES
I
LENGTH (miles / km)
FUND: STP 0/0.00
DESCRPT: SR 18 EB FM MP 24.39/JONES TO MP 0.71/WILKINSON-343085
I
ASSOCIATED PROJECTS: 343085-
PE:NONE ROW: NONE CST: NONE
.
Page 335 of336
STATE TRANSPORTATION'IMPROVEMENTPROGRAM
9/21/00
WORTH COUNTY
PROJECT: 00005X2 TYPE WORK: INTERSECTION IMPROVEMENT
FUND: STP
ALBANY TIP #
LENGTH (miles / km) 0/0.00
DESCRPT: SR 133 AT COUNTY LINE RD AT DOUGHERTY COUNTY LINE;0000522
EXIST. LANES: 02 PROPOSED LANES: 04
ASSOCIATED PROJECTS: 0000522
PE:NONE ROW: NONE CST: NONE
PROJECT: 432145- TYPE WORK: REPLACE BRIDGE LENGTH (miles / km)
DESCRPT: SR 300 SBL @ JONES CREEK 1.4 MI S OF OAKFIELD
FUND: BRIDGE 0.75 /1.21
PE: 1999 ROW: 2002 CST: .
UNDERWAY $10,000
AFTER 2003
PROJECT: 470895-' TYPE WORK: REPLACE BRIDGE
FUND: BRIDGE
PE: 1995
LENGTH (miles / km) 0.21 /0.34
ROW: LOCL
DESCRPT: CR 297 @ SWIFT CREEK APPROX. 2 MILES NE OF WARWICK
CST: 2001
FED Share:
GA Share:
UNDERWAY
$505,000 $404,000 $101,000
Page 336 of336
APPENDIX
.'
GLossARY OF TERMS
ATMS II.
'.
.
Advanced Transportation Management System; a computerized system that integrates video, voice, and
data management functions to collect information about the transportation infrastructure and performance
analysis 4s well as support traffic management decisions based on real-time information.
CMAQ I
Congestion Mitigation and Air Quality Improvement Program; directs funds primarily to areas that have
failed to teach certain air quality standards. Projects allowed under this program include mass transit improvements and high-occupancy vehicle facilities.
CST
Construction; phase of a project that includes the actual construction of the project. I I
DONORiSTATE BONUS
.
Donor State bonus: Donor states are states that contribute more to the Highway Trust Fund than they
receive b~ck in federal-aid highway programs. These states receive a predetermined amount based on a
comparison of a projection of all payments into the Highway Trust Fund and the amount received in
tum federal-aild apportionments. Starting with the state with the lowest return, states are brought up to the
level of
for states with the next higher level of return until available funds are depleted.
FED Share
..
I
Federal Share; portion of funding to be paid for with federal money.
GA ShareI
I
Georgia Share; portion of funding to be paid for with state money.
I
.
HPP !I
High Priority Project; list of 1,850 high priority projects specified by Congress in TEA-21. Funding for
these proj;ects totals $9.4 billion over the six years ofTEA-21. Georgia will receive $283.87 million for
40 projec~s.
.
HIGHW~Y TRUST FUND
Federal account established by law to hold receipts collected by the government, earmarked for highway I
programs and a portion of the mass transit program; supported by the federal gasoline tax and other user
taxes.
INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT of 1991 (lSTEA)
Transportation bill approved by Congress in 1991.
I
METROPOLITAN PLANNING ORGANIZATION (MPO)
I
Required by federal regulations in urbanized areas to develop transportation plans and programs;
I
responsible for developing the Transportation Improvement Program (TIP).
-
NEPA
National Environmental Policy Act of 1969; requires federal government to use all practical means and
measures to protect environmental values; makes environmental protection a part of the mandate of every
federal agency and department.
.
NHS National Highway System; consists primarily of the Interstates and other major routes. Includes a large percentage of urban and rural principal arterials.
NON-ATTAINMENT The 13 county area around Atlanta that fails to meet federal air-quality standards. Projects in the nonattainment area are not allowed to proceed if there is an increase in capacity of a roadway unless they were identified in the 1995 TIP for Atlanta.
OBLIGATION CEILING The maximum amount that a state is expected to receive from the Highway Trust Fund.
OTH Share Other Share; portion of funding to be paid for with money other than federal or state funds; generally provided by local governments.
PE Preliminary Engineering; phase of a project that includes the development of the concept, survey, environmental documentation and design plans.
ROW Right of Way; phase of a project that includes the acquisition of any necessary property for the construction of the project.
STATE AID LET Projects that are funded with state money.
STATE HIGHWAY SYSTEM Network of roads maintained by the state including road and bridge construction, maintenance, rehabilitation and restoration. There are approximately 17, 947 miles of state highways in Georgia which make up 16% of the total public road system in the state.
STP Surface Transportation Program; federal funding category that provides funding for projects on any federal-aid highway, including the NHS, bridge projects on any public road, transit capital projects, and public bus terminals and facilities.
TRANSPORTATION EQUITY ACT FOR THE 21ST CENTURY (TEA-21)
Six year transportation bill approved by Congress in 1998.
TRANSP10RTATION IMPROVEMENT PROGRAM (TIP)
In metropolitan areas over 50,000 in population; a program of federally funded transportation projects
proposed to be carried out in the first three years of adoption by the MPO. There are 11 urbanized areas
in Georgia - Chattanooga, Rome, Athens, Augusta, Savannah, Brunswick, Macon, Columbus, Albany,
Atlanta, ahd Warner Robins. The TIPS's are incorporated into the STIP as adopted by the respective
governments and approved by the Governor, with no changes.
W~RK TYPE
-category of project and source of funding
ATMIITS I
Advanced Transportation Management/lntelligent Transportation System; work relating to
computerized transportation system that supports traffic management decisions; commonly known
as/the NAVIGATOR System.
BicyclelPed. Facility: generally bike/pedestrian path/lane funded through a Transportation
Erlhancement Activity (TEA) project.
Btidges: lump sum funding identified for bridge maintenance or bridge painting
Btidge Painting: lump sum for bridge painting.
Btidge Rehab: bridge rehabilitation - work that will improve and/or widen an existing bridge.
C~pital: funding identified for the purchase of transit related items. I
Historic Preservation: restoration or rehabilitation of historic structures that have a direct linkage
tolt?e transportation system; funded as part of a Transportation Enhancement Activities (TEA)
project.
.
I
Interchange: work at an interchange.
Iritersection Improvement: work that will improve an existing intersection.
Landscaping. purchase/installation of shrubbery, plants, trees, etc. I
Lighting: lump sum funding for purchase/installation of lighting along a National
Highway
Systemroad.
I
Miscellaneous Improvements: identified for various projects that are not necessarily covered by
a sItandard category.
.
N~w Construction: new roadway construction on new location.
Operating: funding identified for the operation of transit systems.
Passing Lanes: passing lanes added along an existing roadway.
Pteliminary Engineering: the design phase of a project.
R~mp: construction work on a ramp at an interchange. R~alignment: improvements to the geometry of a roadway.
Replace Bridge: construction of a new bridge to replace an existing bridge.
R~st Area: construction of rest areas along state routes (Interstates). R~urrace and Maintenance: re-paving of a roadway and minor improvements
RR Xing: improvements to a road/rail crossing, such as the installation of gates, bells, lights, or
improvements to the crossing itself.
SJrety: work that is designed to reduce accidents.
Shoulder Work: improving and/or widening shoulders on a roadway.
Sitlewalks: installation of sidewalk.
. Siknals: installation and/or improvement of signals. '
Signing: fabrication/installation of roadway signs.
Special Studies: lump sum funding for planning and management studies.
'
TJrn Lanes: addition of tum lanes at intersections. I
Wiater Pollution Mitig.: lump sum funding for wetland mitigation site that were taken by
roadway construction.
.
I
Weigh Station: construction and/or rehabilitation of truck weigh stations. Widening: adding additional travel lanes to a roadway.
TRANSIT TABLES
!'
ALBANY
CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5307
pg"gmm;JQNiJ#IPI:fIIPiJJJi:JJiltii=iJili:iJii:i=iJitt:=iii::iltItt/ittFI'=iliiJJJJ: :lli,tllXiiQ1111iiJJ ::tii'JJJifir9.~{i}{t:i: $.J.lPA~i@tt:"}i'}tttlml,:t,:tt:ttm:tt::t'trtttttt:i'i:t'ttti:it=i@titt::t:'::t:ttt:iWi:l:t:ittitimt4QM:i.$.1tti:t't :::'tttJtQ.4Q;~:titti :l:::,l::i:::;':iii:;.;:::il:._
Transit Coach/Lease (4) 30 foot
$121,528
$121,528
$121 ,528
$364,584
Transit Coach Lease (2) 30 foot
$65,000
$65,000
$129,500
$259,500
Transit Coach Lease (2) 25 foot
$0
$26,534
$26,534
$53,068
Paratransit Bus Lease (3) 25 foot
$0
$0
$99,501
$99,501
Paratransit Bus Lease (3) 25 foot
$37,686
$37,686
$37,686
$113,058
Support Vehicles
$38,606
$38,606
$38,606
$115,818
Facility Modification - Ceiling TIles & Paint
$35,000
$17,000
$25,000
$77,000
Facility Modification - Pave Bus Parking Apron
$15,000
$0
$0
$15,000
Facility Modification - Pave Bus Wash Exit
$45,000
$45,000
$0
$90,000
$45,000
$0
$0
$45,000
Oil Water Separator - EPA Regulations
$38,000
$0
$0
$38,000
Parts Storage Bins
$0
$15,000
$0
$15,000
Fareboxes for Replacement Vehicles
$25,000
$10,000
$10,000
$45,000
IV
Capital Maint. Item - Engine Cradle & Dolly
$0
$0
$11,000
$11,000
Capital Maint. Item - Engine and Trans. Rebuild
$0
$0
$11,000
$11,000
Capital Maint. Item - Spare Engines & Trans.
$0
$15,000
$0
$15,000
Capital Maint. - Purchase TIres
$10,000
$10,000
$10,000
$30,000
Maintenance Tools and Equipment
$5,500
$5,500
$5,500
$16,500
2-Way Radios
$5,000
$5,000
$5,000
$15,000
Fuel Tank Testing
$1,000
$1,000
$1,000
$3,000
Bus Shelters Non-Advertising (4)
$0
$0
$18,000
$18,000
Office and Facility Automation
$3,000
$3,000
$2,500
$8,500
PRQ4.lgnAQ$.]:tt::ttttttt:::t::::tn::t:::t:t:'::ttt::t::t::t::tmtttt::::::::itt't:m:tttiIlt i:ti:t:IIm$ll~P4~i :t::':itttt$.41:'-~Q~'ii :I':':tI:t:::$~g~~~r: 'ii':t:::$ll4$.~~i~:::
FEDERAL COST
$392,256
$332,683
$441,884
$1,166,823
STATE COST
$49,032
$41,585
$55,236
$145,853
LOCAL COST
$49,032
$41,585
$55,236
$145,853
DOT DISTRICT # 4
CONG.DIST.
2 ROC
SWG
'"
"
OPERATING ASSISTANCE SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5307
===-- ::i$.WIR:riJtft:::i::{:i:i{::f:if;::::i:::::::::f::m:::::i:m:::i:fi:i:::::::::::mt:r:::::::::ff;::::i:::::::::i:fi:m::::i::{{ :::i:::::::::::ml.lt~$.~}{iffi:: :i:'::r"::i:'~o.tt(t$.$':::':::i:ti::::'
:"'(U~eD.$:::ge.tUQQ:::::r:::i:::ir?m::::mrr?l:f111trr:i1111 1:r:::lrrfiINUtf1IflH': r::':fff'::I:MJ),lJ?:'1:iI:::
07/01/00 - 06/30101
$1,398,392
-
$1,398,392
07/01/01 - 06/30102
$1,398,392
. $1,398,392
07/01/02 - 06/30103
$1,398,392. $1,398,392
f:e.aau.lrRQSiitrrrirr:irrrrm:::::::::;r:1:m:::::::::m:::rt:;rr:::f11 r::::::::;:::1$l:;atl~$s.~::': ::r:::::::H$1:~$$.1~2r :rm:::::::;::::$1WlS,tM1S,1:::: :fffff$4~1:9$~l'7~':':
FEDERAL COST
$362,591
$369,133
$362,591
$1,094,315
LOCAL COST
$1,035,801
$1,029,259
$1,035,801
$3,100,861
w
DOT DISTRICT # 4
CONG.OIST.
2 ROC
SWG
CAPITAL SCHEDULE FOR ALBANY TRANSIT SYSTEM Section 5309
1::::$.1)JPt,m:::):::::tmt:m:::':::'::::::::t:::::::::::@:::tt::::::::::::::::t::::tt:::::::::::::l;:::{t{:t::::::::::::::::::::::::::':nf::::::::mr4J!14A~O)W:W:::::::t::::::::::::~Q41~$.1:::::::)::::::::H::::::::::::::lt(}'PQ~:tt$ W: }: ::W
't:mmI:::::::::':EY:Q1tmI:tI:t' /I::::"::UtYil2'III:::tI:: :::ttt:II':Fyn.att::::'ltt[::I::::r:ITQlAUIII::@
DESCRIPTION'
AdministrationlTransfer Facility
$3,500,000
$0
$0 $3,500,000
Building Modification
$50,000
$50,000
$50,000
$150,000
Vehicle Replacements
$500,000
$500,000
$775,000 $1,775,000
IfR8QQ.et:::~lt::::::;:::tI:t:::tt::'tf:r::::::::tn:::::::::::t:::::::::::r:::::::::::r::\:)'C:;::::;:::It$.4~(l$.P~mJP':: :::::::::I;::::::~$.o.JQQ.\:: ::::::::::::::::I::I$.$.~p~Q.(}'Q::: :::::::t:tt$$~4~~mmt
. FEDERAL COST
$3,240,000
$440,000
$660,000
$4,340,000
LOCAL COST
$405,000
$55,000
$82,500
$542,500
STATE COST
$405,000
$55,000
$82,500
$542,500
DOT DISTRICT# 4
CONG.OIST.
21 ROC
SWG
~
'.
.-,,-.
CAPITAL SCHEDULE IN ALBANY FOR ELDERLY AND DISABLED Section5310
===-= ::$.1lU\tll::m::::::::::::::::::::tf'ffflftt:::t:ff@::mf:::::::i::JI:::::f::f:tt:f::::::::::::::::::::':::::::::::::: :t::::::::::::t4V1rf.l:$.lI::t:f: ::::::Ittl\!f.1.1:Jj:::::t::tt:
:taes.eBJRmQN.lff:tt:::fff:tttt::t::n:::tlm:::'M:l::t:::::::::::f::::f:,fff :::::::::::::tl::::':':SQt:::::::':::::::::f:t ::::ltrm::::::::::fiP2m:::::::t:::j:::::m::
Purchase of Service
$24,476
$24,476.00
Purchase of Service
$25,700
, . $25,700.00
Purchase of Service
$26,985
$26,985.00
:te8.aa.EYlB~QS.llfffffflmfI11M1Il111:@t:::::fff::f::If:t:::::::::tnfm:::::'::::::::$%.I.~4:1!~r:: ::t:ff:l:tltt$.~$.JZQ.lt mt::::t:mttt::{$2$lt$$.f ::::::'f:Jl:::flJlfiZiU$.]lf:
FEDERAL COST
$19,581
$20,560
$21,588
$61,729
STATE COST
$4,895
$5,140
$5,397
$15,432
VI
DOT DISTRICT # 4
CONG.DIST.
2 ROC
SWG
"
r'
ATHENS
6
CAPITAL SCHEDULE FOR ATHENS TRANSIT SYSTEM Section 5307
a,g$.eSlf:lf.tQB.m}:lt:::J:(!::I:t:l::tttJJ::::::m:::l:J=:tltttIII!!I::III:: :&:TU{,#mI=IIIII::::II:=:::lm::J:::II:lIIImm::::l=::=!!=::!=:=:;m::n::w::::::I=:::IJ::IJ::JJ=::
::::::::m:::::ttfiIH~1::::1}II:I:! I:::::IJm!.1=1.J:~Jtlt
::I::1t:!I::f,\Y=:=12=!I:=}}::mr =lJ!=:11=U1U:o.Z$.:::::::!=IIi
.:!:.:I:I!I:::.:I:;~=~i:i:l:!I:I:I!I!I!._
Transit Vehicle (5)
$250,000
$500,000
$590,000
$1,340,000
Demand Response Vehicle-Vans (3)
$62,000
$62,000
$62,000
$186,000
Capital Maintenance
$92,800
$92,800
$95,600
$281,200
Replace Maintenance EQuipment
$51,111
$0
$6
$51,111
Office EQuipment
$0
$5,700
$0
$5,700
Supervisor Vehicle (1)
$0
$15,000
$15,000
SSQUSllttlQS1NJIliIlI:llIIliI:::::::I:!i::n::::::t:::::::::::I:J::::t:::::::II :II:tt=::I=::::$A$5.a~4:t ::;t::::tt:Il$.$.!t$.~$.J.ur t::t:J::t:IIJ.Z4Z;$UQt :::mm::::::I$1.:Ult$~QW1.I:
-..l
FEQERAL COST
$364,729
$540,400
$598,080
$1,503,209
STATE COST
$45,591
$67,550
$74,760
$187,901
LOCAL COST
$45,591
$67,550
$74,760
$187,901
DOT DISTRICT # 1
CONGo DIST.
11 RDC
NEG
~.
"
,,--
I~
OPERATING ASSISTANCE SCHEDULE FOR ATHENS TRANSIT SYSTEM
Section 5307
~=-- ii'i$';!P!WloWi"ii'fi!i"ii'i!@ifIi@iiiiIi"!i!}ji!iii,ii'!i,im;i'iIi!{IJiJIi;@@III@i!i!f!:iit:t::'::!:!':::::!iii~!g;t(J.;?~i':I::::' :::::ii:f:!:1imj~Z~g::I:!I:iii
}QP]iBAilllNSfee.SlQPr:}::i:;!:}i::r::ir::rr:!r:!:!:!:}}}!:!r::r:rt}:}} :rr:!!:!rreM:~n::::!::r}::r: :::::i::::::!:'FM::;qg:!}::}}!:r
07101/00 - 06/30101
$2,453,400
$2,453,400
07101/01 - 06/30102
$2,543,400
$2,543,400
07101/02 - 06/30103
$2,502,468
$2,502,468
}RRQQE:Qi:!QQ:S'l!t:!It:i:}}}}}!:!:}!}ii'::i'::I}!i'::i':::}::W{:!:}}!!:::i{trr: :::::i:::!!:}}$2msamw::: :{!{{::i$2~$.4.aili401::: ::::::{::::'::!::~~$n~~4.$a:i: ::{{::::::!:::$7~4.'!I.~~~${
FEDERAL COST
$454,743
$446,200
$454,743
$1,355,686
LOCAL COST
$1,998,657
$2,097,200
$2,047,725
$6,143,582
00
DOT DISTRICT # 1
CONG.OIST.
11 ROC
NEG
CAPITAL SCHEDULE FOR ATHENS TRANSIT SYSTEM Section 5309
:);)I$Qt1,ett&lf;\rm:;=::::::::::::I:t::ttIm::::t:::::iIWf:lttl::::::::t:;;t:;::::r::::::::::: ::::::::=:::::;:::::::::eM':ll::r::r:::::=:::::::::: ::;;:::;:::::::::;:;l!l1::().~::::::::::::::;:::::::m t:::r::::::::::::::f;1::J$.m:r::::::::r:::: ;:::::::::::::::::::1:0111;{::::;:::::::::::::: rS:T:D.1Mltrt::::::::::::::::mttr:::t:n:::):::I::ttrn::::::i:I):=rtm:::)rr::rr:):::::::::::::I::::::::)=:rj:::I:tt: r::;:;::::::tIQIII1::::::::)::::;:::::::: :;:::::::::::::;:::;1)P:1:n74:r:I;rIt :rI))::mIn~l1::1:$t:rjm
Transit Vehicles (6) Multi-Modal Transportation Center
500,000
500,000 1,199,000
500,000
1,500,000 1,199,000
rgf:l<>.g~~1J;rmsn:::::;;rrtj@=:t=::::::::::::t:;I:::!:::::n:j:::::I:=}:::tt::::j:r::IfJ::::J:I:::W::::::::;::rJf$QJ.;'b.~lQt :::~:t::::::::::::i:a:~I9.:.rOO~{ :;:::::::::::rrtrt$f.p.HmO:::: !::::r:=::::!:::::t~;9,S:JD.U~r
FEDERAL COST
400,000
1,359,200
400,000
2,159,200
LOCAL COST
50,000
169,900
50,000
269,900
STATE COST
50,000
169,900
50,000
269,900
DOT DISTRICT # 1
CONG.OIST.
11 ROC
NEG
\C
'-
t.
t~
CAPITAL SCHEDULE IN ATHENS FOR ELDERLY AND DISABLED Section 5310
Purchase of Service
I! :!: ! :!!l~!;~ ~ ;~:! ! :! !:!l:!: ! :!:::!::!ixQQQ!1:$$Iln':: m:::::::!::rmQm:n::1:~':::::::::!:m! ::::::::::::::::::!:6::P.~t::::::::::::::::::::: :::t'!':!"::::!::::EY1::0a::t::'jtJ:::: :::::I::::::j::jJ:Qi.AU:rttIj!
$20,503
$20,503
Purchase of Service
$21,528
$21,528
Purchase of Service
$22,604
$22,604
'q1B~Q..e.1t~QStm,::::':t:'r::r,t::':::::::t::::::,::::::::::::::::::::r::m::::'['::::f:mt:r:::: j:j::m:mtjf::::::::j:~t).~9.o'~::: !:,::::j::::'I::I:j:::::$~j:~$~~:::; j::!:j:j:::::!:::t:::::,:::j:$~~~~Q4::: ::f:::f:::::::::I:::::::~A~~~:::
FEDERAL COST
$16,402
$17,222
$18,083
$51,708
STATE COST
$4,101
$4,306
$4,521
$12,927
.....
o
DOT DISTRICT # 1
CONG.OIST.
11 ROC
NEG
ATLANTA
MARTA
CCT Douglas County
Gwinnett County
Rural Programs
x
!:"
Elderly & Disabled Programs
,~.
11
ACCESS TO JOBS/REVERSE COMMUTE PROGRAM Section 3037
/
Program Costs _
$2,000,000
$2,000,000
Program Costs
$0
$0
Proaram Costs
$0
$0
l$lilQijj~ $1,000,000 $1,000,000
-tv
DOT DISTRICT # 7 I CONGo OIST. 15,6
ROC .
ARC
h
~.,
~~
CAPITAL SCHEDULE FOR METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY Section 5307
!!!!.i:!:!;!:!:!:!ii=~i!:::!!i::!!:!:_ :U.~QfiURr.tt1I~1111tt:r:rr:1111:~rr:::~r~~rm::::~::t11t111r:::11111 :::n:~:~:~rrr~:::1111::::::111: f}:~~t}rFMH~Z]::t~rr:}
rrn:JltUUUn3.QnnnJ: $;miMirrrrrI1:Jtrr:1::fr:J:r::::rrrrr:rrr::rr~:::rrm::::n::nrr~::~:::J::~::::::::r:
I:1~nnmQo.QO:$lnl:nr::
Vehicle Overhaul (Bus/Rail)
.
. $4,833,287
$4,833,287
$4,833,287 $14,499,861
Associated Capital Maintenance
. $8,047,563
$8,047,563
$8,047,563 $24,142,689
Tools and Equipment
$1,000,000
$1,000,000
$1,000,000
$3,000,000
Security Equipment
$1,000,000
$1,000,000
$1,000,000
$3,000,000
Line Structure Rehabilitation/Renovation
$500,000
$500,000
$500,000
$1,500,000
Facilities Rehabi Iitation/Renovation
$525,000
$525,000
$525,000
$1,575,000
Environmental Rehabilitation/Renovation
$412,684
$412,684
$412,684
$1,238,052
Maintenance and Support Vehicles
$425,000
$425,000
$425,000
$1,275,000
Computer and Computer Related
$100,000
$100,000
$100,000
$300,000
Training
$130,000
$130,000
$130,000
$390,000
Preventive Maintenance
$21,665,489 $25,454,858 $30,696,194 $77,816,541
.....
Bus Replacement Program
w
Transit Enhancements
$1,000,000 $500,000
$1,000,000 $500,000
$1,000,000 $500,000
$3,000,000 $1,500,000
:a.b.itikRt.6Jaa.tsprat6.nj}:r::j}II:Ij}IIIIIIIItm::I1:1I11I:::I Imtr$4UUJ9.~o.23.r :~~~rr::$.4.3.~$28~a$.II: ~::rrn$4$~1:6.$~Z2$.t :::::::$1aa.~2a1!a:4ar
TRANSIT PLANNING PROGRAM
Regional Transit Planninq
$807,825
$807,825
$807,825
$2,423,475
Short Range Transit Planning
$1,633,505
$1,633,505
$1,633,505
$4,900,515
Special Projects Planning
$1,000,000
$1,000,000
$1,000,000
$3,000,000
Long aanoe Transportation Planning
$968,670
$968,670
$968,670
$2,906,010
:i.t4.ti$lt::e.!;mmqgl~~(MmmtLqMt:I~:::::::::::::r:::::::::::::::~:~::::Im:: ~:::::::::~:~::::::::$.4t.4j::U~lPm: :~:::~:tr:::::::$.4.~~1ij~Ann::~: :::::::::::~:::m::$4.;'41:Q~QU.AI ::::::1:::::$j~~~atnnlPr
:B'B.QUr;$.;~:.$.lmIIIt}Il::Jlrr:::::::::::t::t::tt1::f::::IJtJI::~:::::::I~:I:~:I::::::$.4.4~$4$~~~::: :::::r::~~$AI~~~I~~~~n :1:1:$$.~~$7$it~$.11 t{$14.~~4.~ta:4~::
FEDERAL COST
$35,639,218 $38,670,714 $42,863,782 $117,173,714
STATE COST
LOCAL COST
$8,909,805
$9,667,678 $10,715,946 $29,293,429
DOT DISTRICT # 7
CONGo DIST.
4,5,6 RDC
ARC
CAPITAL SCHEDULE FOR METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY 5309
:nt::nFfIJA,tttItt Qe$QB.JeI.~QNIIIIIIII:::::::::nn::::::::nn:::t:::III:i:III::t:::::IItttttntIIt :IttttJP(J~lnttt::t: ttttt:Fr~tttti:: nnn:::::::f::Q~:nntti
FJJjd:::f#.ij4.w..ytlr:tttlittIttttt:mrr'ttttIttt:$.llp:~flriir rrr::rlQ:i~Q7Wttti iimHtt~~~$.t:Itt: ttt:m~~~ZI:tt:
Ashby Station TOD
Line Structure Rehabilitation
$2,500,000
$2,500,000
$2,500,000
$7,500,000
Station Rehabilitation/RenovationlFare Collection
$2,500,000
$2,500,000
$2,500,000
$7,500,000
Rail Car Rehab/Retrofit Propulsion System
$17,500,000 $18,125,000 $18,750,000
~nJ.~'(RJ~J.M'(tp.t9.~a~ijlt:f::f::t:::::::::::tr::t:::::::{::$J1~t:::t}::::::::::::::::t:!1D.;i;m~rg:::t::: ::t{ir7Q?~~t:@Ht ::JJ::::;t()M~~r::ff
Procurement of Clean Fuel Buses
$4,000,000
$4,000,000
$4,000,000
BilU'Jivj::$.liJifttttttttItIIItttitt:::::t::::It:::::rt$TIPI:tttt:: t:ntflQ7~qp.tttrt ::r::::I::[QQq~4rttt mIttIt~~it:::tt
$54,375,000 $12,000,000
Corridor Study: South Dekalb-Lindbergh Study
$950,000
$0
$0
$950,000
North Line Extenslon-Dunwooay to North Spnngs
and 56 New Rail Cars
$44,625,000 $31,250,000 $18,750,000 $94,625,000
Iwest Line Alternatives Analysts and Deis: Holmes to
Six Flags
$0
$2,000,000
$0 . $2,000,000
'~ "'"
eR~eo.x'.~T@f{ittfmI%:mm:f'::f::::{::r::::::r{:::::@mm:fnll:Ii': Jfmmift.q~~P:
.. P~~1:{t~
.i.: J~f:i.Milmi.: ::@}J.17..~$)~:g
FEDERAL COST
$57,660,000 $48,300,000 $37,200,000 $143,160,000
STATE COST .
$0
$0 .
$0
$0
LOCAL COST
$14,415,000 $12,075,000
$9,300,000 $35,790,000
DOT DISTRICT # 7
CONGo DIST.
4,5,6 RDC.
ARC
h
..
_!-i;
CAPITAL SCHEDULE FOR COBB COMMUNITY TRANSIT Section 5307
Qe$.;RJRlJ.Qt.Ulf!ll@ff:!lmf!:fff~:::!~::!~::ff:lf::::::~:f:l!::lm!{{::~:III@ffff:f!~ ffffffg'tnf::~IIII:~: :~:::~~:~~I~::~~~:FM:~lg:II@:::~ff ~f::!:::f:~ffEM:J>,a:!IIII{m {::ffi{r.Q]A;I:.:::!:f::~fi $mJfM#{{l:;;f!I:!:::!jm;:Jfilf!::::~ff!:::f:l:::::!I::~f!:!:ff!:f::::f;::f::!::l::!:::j::::::::l:!:!::::~::::!I{{tfff ;:::::t:::jf?QZ~P.3!11{@f ~ljff::fZQi~:::tfj~f!: ::~::!:::!:!:!:rrQ~$.::j:f::::f:j
Transit Center
$1,000,000
$300,000
$200,000
$1,500,000
CNG Fueled Support Vehicles
$50,000
$25,000
$25,000
$100,000
Transit Enhancements: Bus Stop Improvements
$400,000
$100,000
$100,000
$600,000
Computer and Computer Related
$100;000
$50,000
$60,000
$210,000
EducationlTraining
$20,000
$10,000
$15,000
$45,000
Perventive Maintenance (including upgrades)
$4,960,000
$2,620,000
$2,740,595 $10,320,595
Capital Projects: Bus Replacement
$0
$640,000
$960,000
$1,600,000
Capital Projects: Paratransit Vehicle Replacement
$1,050,000
$0
$0
$0
Fare Collection System
$300,000
$100,000
$100,000
$500,000
Capital Projects: ATMS and Related Equipment
$370,000
$100,000
$100,000
$570,000
Capital Projects: Paratransit Operations
..-
Ul
Transit Planning Program
$1,357,222 $600,000
$760,903 $300,000
$700,000 $300,000
$2,818,125 $1,200,000
Capital Cost of Leasing/Facilities
$300,000
$150,000
$200,000
$650,000
RaQ4Egl1QQ$mflt::::~~:::~:~:{f!:ff::f~f!mf::!:::!t:!:f!:IffIftt{j::::!:;:'i!:::Iff::tmff:::mf$.:1J:Mi~i~212} ~f::~:ff:$.$.~1.~~l$.p.af :'tm::f:::$.$.~'$.~l$.$.$.f ::::::::::::J.aq;11all~:::
FEDERAL COST
$8,405,778
$4,124,722
$4,400,476 $16,930,976
STATE COST
$1,050,722
$515,590
$550,060
$2,011,372
LOCAL COST
$1,050,722
$515,590
$550,060
$2,011,372
DOT DISTRICT # 7
CONG.OIST.
6,7 ROC
ARC
CAPITAL SCHEDULE FOR DOUGLAS COUNTY Section 5307
i:!!I:!:I::::!!r:::i:=~iijr!'!r:r:r:::r:r:_ I(n;S~8.lemlgli@t:i:Wfm:fWWW!:W::w::::r:i:i;:i:WW!:!;:!tt!!it:1t:::WifitNNfW :::::;;'tti:::W:i5Mi])'WWW::W:@I:: :t::::::::::I::ai'!!n~WfWii:W:ii:;
:::fS'-lei:JI:I:::IIi::'I:rrrrrWWrrrflMII:r:t::::Wii::::n::':'lrr;rtlr:::::::::::III:: :::;:::::"::r::::tQ7$.9~;IIII::: :;::::::::::::rt1itrt,g~\lJ:::::::::::::'r
Park and Ride Multimodal Terminal
$1,334,965
$375,000
$297,500 $2,007,465
City of Douolasvllle Mini-Bus Study
$40,000
$0
$0
$40,000
Van Purchase (19 Vans)
$85,000
$119,000
$140,000
$344,000
Terminal EQuipment
$50,000
$0
$0
$50,000
Computerized Data Collection System
$50,000
$0
$0
$50,000
:::RB.~U.e.;;lt~T:E:::::m::::::::::::::::::::::':::::::::: : ;:: : i:'I::::::: ::::iii: : : : : :'::I::::i:::::::::: ':: :::::::III::::::$1!~II;"&.$: i:i:::::::liI::::::iII::::$.;1,14~lm~ ::::::::::::I;:::::=":::$4.a1~po.u :::::::::::::::::::$.Z4~11tf:$P:::
FEDERAL COST
$1,247,972
$395,200
$350,000 $1,993,172
STATE COST
$155,997
$49,400
$43,750
$249,147
LOCAL COST
$.155,997
$49,400
$43,750
$249,147
-0'1
DOT DISTRICT # 7
r
CONG.DIST.
7 ROC
ARC
~
..:V
CAPITAL SCHEDULE FOR GWINNETT COUNTY Section 5307
:\:!~1:!:!:\;:::!;ii=:~i\!:\:!:::!:\:_ lQS.$.'IIJPT'QN::::r::::rr:~:::':r~:IIII:l::l:::":llllI::l:r::::}::II::IIII::::IIt:::l::::::::::~:IIII IIll::ff:FM:nJr::r:rli :II::::rr:::~::EM:u.~::l~r::ll:
:::S:OOeWKlrIIII:::::,:r'ir:::r:'Im:::':'::::::'}:II:::i:::illllll;III~'r:}::::l::::::::~::l::i::':::mml}:'}~ ~IIII:}::'a:Q71$.$:iIIIIr~ :~~rrII:"1Jl71.$71'rr::l
Transit Center
$1,326,745
$0
$0
$1,326,745
Preventive Maintenance
$1,000,000
$1,900,000
$2,300,000
$5,200,000
Tools, Equipment and Markenting
$0
$578,710
$340,825
$919,535
Transit Enhancements and Passenqer Amenities
$23,503
$25,040
$26,675
$75,218
CNG Local Buses and Bus Related Equipment
$7,731,500
$0
$0
Diesel or CNG ADA Buses
$700,000
$0
$0
$700,000
Transit Enhancements and Passenqer Amenities
$106,300
$0
$0
Contingency
$143,163
$0
$0-
$143,163
CNG Fuelinq Facility
$1,468,442
$0
$0
'IBRtmf$.elrPQS1HJ'mHf:H:l:HfIfnfm::::;:m:m::::HHffHIfIIl'if:'iffUF: ~Hi:I:~$.1:gt4'-$.:~.a::': ;:::::::::::II$t.~$.Q~~7.$l:f :::mlrl$~~Q$.7:UiQQI ;mff:::$~h$.$.4.~SJ.n
FEDERAL COST
$9,999,722
$2,003,000
$2,134,000
$6,691,729
STATE COST
--..J
LOCAL COST
$1,249,965 $1,249,965
$250,375 $250,375
$266,750 $266,750
$836,466 $836,466
DOTDISTRICT # 7
CONGo DIST.
4,6,11 RDC
ARC
CAPITAL SCHEDULE FOR GWINNETT COUNTY Section 5309
I,~r~r~~,a'',!fl!1!L~~E!RI'ij!.lf.a",lJJJ't1'I!~~J"t"'~"~';'~'j'i\.'!i Pil:ru~#:\E.,M;::~,10c.2,i\lilm,.,i,"i,<J~~1~' Iii~i*E~1l~iffu~f1ID(tL;",f~""a...1..1F!..~lf~1I'L.~!IE1il';1[.Ii'.r"tJ"~,m."~.,l~,!,.i\ll~~~
. . '~j~,!i~r~4l*Ili..a/:tOIiIiQ?!:~l~ml~a ~~'~fl1~~iH~B;l,:1.')t~D:4~a.~B;.}Ft~mj~r.~
$6,400,000
$0
$0 I $6,400,000
.....
00
DOT DISTRICT # 7
$0 I$6,000,000 I
$0 I $6,000,000
'I~mI~~Ii\!lrliJ'{t~,t'!6"i"1'"l"I,,.l,nm~oJltt;~~,.,"w",,.,,,~,",(,",i,,bf:lQ:,,D,,,',~."!lliTlll:'i\,Gr~iI~III..1ft~~~~I'$#,f"~.l,$Jil)i"I"":,,i'2N,9..'t'~lMQf"<()'., O. ~O~
$5,120,000 $4,800,000
$0 $9,920,000
$640,000 I -$600,000 I
$0 I $1,240,000
$640,000 I $600,000 I
$0 I $1,240,000
CONG.OIST.
4,6,11 I ROC
ARC
h
".
.....J.!
CAPITAL SCHEDULE FOR ELDERLY AND PERSONS WITH DISABILITIES ATLANTA AREA Section 5310
iC.QU:N1IIImmI:I$.llRlf::JJI'mJJJqJ::JnEV::~Qnn::J':Ir['JJEt;~ijQ2JWillrnm"IDf~$;,tI'J~F:ni!J;raT4g)':It
Cherokee
16V0725
$20,503
TOOOO01
$21,528
TOOO020
$22,60'!1.
$64,635
Clayton
17V7041
$32,805
TOOOO02
$34,445
TOOO021
$36,1671
$103,417
Cobb
17V7042
$86,112
TOOO012
$90,418
TOOO022
$94,9391
$271,469
Dekalb
17V7043 TOOO013
$131,219
I
$137,7791
I
I
,
TOOO023
$144,668
$413,666
Douglas
17V7044
$14,352
TOOO014
$15,070
.....
\0
I
I
ITOOO024
I
1
$15,8231
$45,245
'Fayette
13V7039
$14,352
TOOO015 TOOO025
I
$15,070
$15,82~
$45,245
Fulton
17V7045
$178,375
TOOO016
$187,294
TOOO026
I
$196,6591
$562,328
Gwinnett
11V7028
$57,408
TOOOO17
$60,279
TOOO027
$63,2921
$180,979
Henry
"3V7040 TOOO018 TOOO028
$16,402
1
I
$17,222
$18,0841
$51,708
Rockdale
17V7046
$10,251
TOOO019
$10,764
T000029
t;~&~~26~~780%)
STATE FUNDS (20%)
rn/:}/:f~::~::~~.
$11,302
. $32,317
iJWJJ:k:$.$:e~i$..eQ:)':':':r))):$Q.Wi$..et: "JJ:iJ:)$Vl'lMQ.QQ
$471,895
$495,489
$1,416,807
1
$112,356
$117,974
$123,872
$354,202
OPERATING ASSiSTANCE SCHEDULE FOR NONURBANIZED AREA TRANSIT (Atlanta Area) Section 5311
PAQN.T:::IU: ~[.mWMf::'\:::::::::::::t{t:::,:}t}:JUJ@J}f#@}Ift::n::\ \::{it::: )ft:{tJtll~l'tttt: ::::ttttJil.@Qgnftft: ,:r:'t':::::i@FX::Q$::::t:ttt :::::t:@::nrQr.lt.t':rttJ
Cherokee 6B9005
$75,200
6B9006
TOOO046
Henry
3B9005
$82,968
3B9006
TOOO055
OOi.m4\(J~O$1t:$.li:::H:fli.,ttl}:Ur:tHi.miniW:Wl:::H:l:i::JJltJd::,:,:::Htt::: tiJiJ::'}tl~:~"~~;~:':
FEDERAL COST (50%)
$79,084
LOCAL FUNDS (50%)
$79,084
75,200
$79,200
79,200
$78,000
78,000
82,968
$87,120
87,120
--
.
$91,474
91,474
:t~I~Ql :Itl1?t$lfi~;41.4:~..~~~~~{
$83,160
$84,737
246,981
$83,160
$84,737
$246,981
CAPITAL SCHEDULE FOR NONURBANIZED AREA TRANSIT (Atlanta Area)
..
Section 5311
otv
~.::.:....:..:..::..,::.~~~:::'i~g~!tkt':i::'::::::J:::::i::tttt:::::::::::::t:t:::t:::::ltt::::~:tttttJ~:,tP.?:::tltt\ ::::::::::::::i::::tF:y'!:9~tt:::tt~
STIP #
6C9005
6C9006
TOOOO46
Cherokee . 2 Shuttle Vans with Lifts
$0
$0
$104,000
$104,000
2 Shuttle Buses
$90,000
$0
$0
$90,000
Henry
STIP# 2 Shuttle Buses (Diesel) Shuttle Bus.
. 6C9005 $70,000
6C9006 $43,000
TOOOO46
$70,000 $43,000
-
-
.
mQIAI4.:@QT:'if:f'::'lf::'f':'I@ltt::"lt'::mttt:'::ffffftttm::::t:l::f::::ff:: rrrr:. .J'P.~QQQtttr @}}fLl.4.~~9.Q.Qt:))t ::f)::::$lP.4;.QP9.:tt'U ::U:'::$~1}QP9.:)Jfm
FEDERAL COST (80%)
128,000
,34,400
$83,200
$245,600
STATE FUNDS (10%)
$16,000
:ti4,300
$10,400
$30,700
LOCAL FUNDS (10%)
$16,000
$4,300
$10,400
$30,700
~\
AUGUSTA
. ----
"7
21
CAPITAL SCHEDULE FOR AUGUSTA PUBLIC TRANSIT Section 5307
:::!~.!!;!.!::.[::=:'=~~i;[!:;!:!::::::!!_ OESUalemlQN'@f[::tIIII':!Itlff!::t':::':ff'tttttttttttttlff!:[@['f::f:'fttteM1Q1II!ttttt I:':[:[I:ftfFOO::(l2It'!'tiI:f
:$TJ.Rl:.Jf[JJJ[IJ:::::::::tf::::H@liIIllHH@HHHHiH~tlHf!JlfffIf'l'lifJtm ::IH1:[Wa:D.2024.Ht@It::! ::tt:f:::t2Q~a~rf:t~II.
Transit Vehicles
$650,000
$1,300,000
$0
$1,950,000
Capital Maintenance Items
$50,000
$50,000
$50,000
$150,000
Preventive Maintenance
$1,000,000
$1,000,000
$1,000,000
$3,000,000
Project Administration
$11,000
$11,000
$12,000
$34,000
Contract Continoencies
$95,900
$96,320
$0
$192,220
ADA Expenses
$200,000
$180,000
$237,500
$617,500
Shop Equipment
$5,000
$10,000
$5,000
$20,000
ADA Equipment
$2,000
$5,000
$2,000
$9,000
$400,000 FY 00 :Ba.tm:ec.J.t~b$.1il:[:m:::mmmtUtJ!:!M;:mt:!:1I:MI!JttfIlt!!1~ i~ ~::~:!!::f:tll"~QI:3~B.QQ~:! [:::::::::Il:::$~l.'$~~$;iQ:I ::tt::::::::~!~:$i:~3QS.1$.1U.!:: m:!~!:It$.$i$7.2~ZaQt
FEDERAL COST
$1,611,1"20
$2,121,856
$1,045,200
$4,778,176
N
STATE COST
N
LOCAL COST
$201,390 .$201,390
$265,232 $265,232
$130,650 $130,650
$597,272 $597,272
DOT DISTRICT # 2
CONGo DIST.
10 RDC
CSR
~
.
'J"i
.'
CAPITAL SCHEDULE FOR AUGUSTA PUBLIC TRANSIT Section 5309
$JrnRTii~l~~ Transit Vehicles
A'B~1.lEGJfle<:f.sml!t~~~ i'~,......""...(;_'~N~~.. d .(; ~....,~~,,_;o;;N~N~~n...~~~ FEDERAL COST STATE COST LOCAL COST
DOT DISTRICT # 2
1li~t:f~f:b~l~~lrI.;-"(_Jv,O_O..~.v.",, ,51l.,t>~s,,,,~,_@, ~:f~\*mJtmoE_l,.j""'".o~,_~.;t.~7.,l.i..),.iJ4ft;..,."-!B_i:1'~1l'a:1~';~)ru~~_t,,,o,.",,(,Qj~ ~.4r""~('3__"iJ~!l!mitl%~f.\ti 1t~"~~
$500,000
$500,000
$500,000 $1,500,000
!\LjftD""*"l""l>,r.t~_&.:,,o,,OI~."o~o,,o,,i" 1rlItiiti~.,;!;lS~,~,i,.1$r$,.,;,'."",O. O"'W''O,'OOJli. m.A~lfii!i',]'Jfii1"~,"f~14$'','"'.',O.O"~.(,j.,O,'$O'~',11l:~,~~,~l~l~I!l,f."f,i~(_j,o.1n"''Q"Odo''1'''i~
$400,000
$400,000
$400,000 $1,200,000
$50,000 I
$50,000 I
$50,000 I
$150,000
$50,000 I
$50,000 I
$50,000 I
$150,000
CONG.DIST.
10lRDC
CSR
IV I.
CAPITAL SCHEDULE IN AUGUSTA FOR ELDERLY AND DISABLED Section 5310
= i i 1 : I " $mIQj'#"1\'ff:'fjmmr::I:rtIJII:I1::m;rm:j::'If:IW:i{ffrifr::;:1frf:mJ1'fm:::\I' :f:;:J:r':~Mza~~II:fjJm W:I:;;:1':X~o'U\t$pffJ:m
QRe.SAllNGte&fUQP:jjj:rrrrjfjj:rrrttt:tt:::f:jfffljttt:tm j:f:jittttEI\01\ffir:ffj fl:ififJiM])~tt:t:tjjt
Purchase of Service
$53,308
$53,308
Purchase of Service
$55,973
$55,973
Purchase of Service
$58,772
$58,772
ea<lUillt'ef)$Tirjj:j:ijj:it:ffjtti'i::WjfffffffiWt:iWWWtWjjW:j'tfW,j\t: If\'f'f':':t::\':"'\':::$.$.I~S.Q~i fiffftfflW$.$.$.JI.ZI 'tWjitrjj:jtmff$$I~Z7a '\rjj::ji::rrttjj:$t:d~Q$$
FEDERAL COST
$42,646
$44,778
$47,018
$134,442
STATE COST
$10,662
$11,195
$11,754
$33,611
I..V..
DOT DISTRICT # 2
CONG.DIST.
10 ROC
CSR
~
"
';\
'-Ji;'
CAPITAL SCHEDULE FOR NONURBANIZED AREA TRANSIT (Richmond County) Section 5311
$85,000
$0
i,~,o.-~'f~_":",;,t~",m~1'~ot'Q!~'-~_''~''w1JlL FEDERAL COST STATE COST LOCAL COST
"~f!~~~,$,85~7_O,,b,.o,,lA,j,.,~1."..%,.t!l%f~t&'l:ii;ml~.W_J'L:t_$.,~,_~p'3.,1.,6_,U~O_
$68,0001
$98,800
$8,5001
$12,350
$8,5001
$12,350
DOT DISTRICT # 2
CONGo DIST.
10lADC
CSA
OPERATING ASSISTANCE FOR NONURBANIZED AREA TRANSIT (Richmond County) Section 5311
N UI
(01/01/01 - 12131/01)
(01101/02 - 12131102)
(01/01/03 - 12131/03) 'B.a~~~WJ~C2~71i!i.~ FEDERAL COST LOCAL COST
DOT DISTRICT # 2
$143,900
$143,900
$151,095
$151,095
$175,000
$175,000
If~~~~!~ $71,950
$71,950
~$~~~~~9.9.~ Il.~$:1fZ~;Q AW&$)~~J~.!Jj
$75,548
$87,500
$234,998
$75,5481
$87,5001
$234,998
CONGo DIST.
10lADC
CSR
CAPITAL SCHEDULE FOR NONURBANIZED AREA TRANSIT (Columbia County)
Section 5311
t1J:lf~~.$.QQ~JI.~~ , $JiIR~:J.1lr&.~!.lJ.~a rt.r~~~Q~ .llffilliTIt~~~lIlt~~
~OButTi1et:t,~!lIJ~ .. .."...,.~ ."._",,~i!!. ;;:<_;,,"~.,.;\,~~,,_.,,~ . c..,., ., .. ~_, \I".,. <
. ' .'" - . I1'WI' ,it." .~ ,>"~g"~ ', ~:..{",,O.~~O~;1~..f. .-.,l~5t~jl't:~Ov ~:-ti~:L! rl~.dl&ti.J~:,a~Q'-,2.;'m h~m",t,J~..I".:t1:l: ,~i}',"'..',.m,k0,;L1'4t.~~'I~ii .j"1l.iJ~:'fq
Standard Van with Mobile Radio
$26,500
$26,500
Mini-Bus with Lift and Mobile Radio
$42,500
$42,500
!fai~fll:;~A~~~r.~lIIf~'il ".$.~~~QI${~'il$,t~~~e'QQ ~~ .t.~.i~~:Q ~l.J@;iii[IP.$~~~l~:Q
FEDERAL COST
$21,200
$34,000
$0
$55,200
STATE COST
$2,650
$4,250
$0
$6,900
LOCAL COST
$2,650
$4,250
$0
$6,900
DOT DISTRICT # 2
CONG.OIST.
10 ROC
CSR
N
OPERATING ASSISTANCE FOR NONURBANIZED AREA T~ANSIT (Columbia County)
0\
Section 5311
(01/01/00 - 12/31/00)
(01/01/01 -12/31/01)
(01/01/0212/31/02) r,"et."~8"'t~si~lioSo.-~-~M7t!fri1e.,..~~.~..,si,.g,~~ FEDERAL COST LOCAL COST
DOT DISTRICT # 2
$109,800
$115,300
$121,065
$109,800 $115,300 $121,065
$54,9001 CONG.OIST.
$57,6501
$60,5331
10lROC
$173,083 CSR
'"
,
BRUNSWICK
27
CAPITAL SCHEDULE FORBRUNSWICK MPO Section 5307
::I:ll:I:!:::i=:~i!:!!I:I:!!!!!_ UI:e.se.mBTIHfIMfIIII\111titt':;:I:t:j:::::::\:\:::::j::tt:\:: ::ttt;;reY.o.'::'~'j;'II::~': :j;:::j'ljt::g::D.I:::IIII:
:j::$.r.leUMtrt;\11It:::::Ij:tt:I:;t;:::I\;;r;m'~:II:;':rj:t'j":\:jr'j'II1I: !:':'t'IIp.J.J.J)$:rr:::::: '1I1j'IP.J.J.~:~:'jrrr
Facility Leasing Three 30' Transit" buses Office Equipment Two Vans Capital Maintenance Contingency
$0
$30,000
$30,000
$60,000
$0 $150,000 $150,000 $300,000
$0
$0
$0
$0
$0
$40,000
$40,000
$80,000
$0
$10,000
$10,000
$20,000
$0
$15,000
$15,000
$30,000
::ie8QU:ePltICaSm:tmm:ll1;m;t11::i:tltiltff ::::~:"::~mmmlf':f:~':i:::~'::~i$~[~:: ::::::it::i$~4$~tmU.:f :::iffi::$~4$~.U.1: :::J1:fi$4:$U.~tmU.l:
FEDERAL COST
$0 $196,000 $196,000 $392,000
LOCAL COST
$0
$24,500
$24,500
$49,000
tv, 00
STATE COST
$0
$24,500
$24,500
$49,000
DOT DISTRICT # 5
CONG.DIST.
1 ROC
CG
'.
~)
,
'-.1\)
CAPITAL SCHEDULE IN BRUNSWICK FOR ELDERLY AND DISABLED Section 5310
s~"m.t,e}l~~"'~Jt~~~~\~.~,~'_t~j~;~!Jlw:11~~~k~SJMI~D~~~~#~I~~ILf'lc~l1;mf~&,1,t~~~-t~.W_tJti~jl ~~~\,!ti)r",",1~l..0.~0~A0.1~,1,!>,5.~,~~~~~j~ ;r~~~l~,m-~,O~.O..O,<~,.,,,.~..,,t..1t5.J8;,.!<~m;o~-.%1.J~iH f1ll1~;iret*"ifK,f.if.(t:"l}.O..,Q,,t!!;thi:i,.9~:8ol~il.~:r~+: mm.:~,~,,,,~M.ii~j_;n..~j~B~fif~:t~~EWL_'J~ !~~i>~J~~'!liL!*'~Eft.f.$tl0L2,.t.,1_,i.~4,-1.,t.~~_,j<"j ~h:i1~.~Iffi~;:E;.~M~~,'t~~.:w0.,.3,'~1tW/~ngm~~, ~,~~t!'J;.dl-~~1~"1",..",m.~.m",~~;.~,c',,~R[m~~t,!,~
Purchase of Service
$22,553
$22,553
Purchase of Service
$23,681
$23,681
Purchase of Service
$24,865
$24,865
$4,5111
$4,7361
$4,9731 $14,220
tv \0
DOT DISTRICT # 5
CONG.DIST.
1IRDC
CG
COLUMBUS
/
30
,
-t..)
CAPITAL SCHEDULE FOR COLUMBUS TRANSIT SYSTEM Section 5307
DESt.NF:t:DONiII:':::'::r:::::':::'::::::rtiI=r::r:::::=r:rrr::r::rr:::::r:::,:,rI:::::I,r:"tItttI' II:rr::p(::~r::r:rr $!!P:Wp:?&??:t::::,:::::,,:::,=,::,:,t:r'=':':::::':mmm::::=:'??\i:::::,::::rrr=:=?I:)\\IJ"'\::\\?:N:\ =:?=::)=:~9.~Ir:r
:::I'rriPW$.~=r::r'r: :::::::r'::,,')~P.O:Z)'\:::::=
j:::::i~:::i:;:=::::::::::_
Tire Leasina (Tires, Tubes, Materials)
$74,894
$74,894
$74,894
$224,682
Engine Rebuild Program (21)
$85,600
$85,600
$85,600
$256,800
Transmission Rebuild Proaram (15)
$58,850
. $58,850
$58,850
$176,550
Perventive Maintenance
$310,300
$310,300
$310,300
$930,900
Vehicle Oil Seperator Svstem
$96,300
$0
$0
$96,300
Transit Coaches (17)
$271,817
$581,690
$3,698,716
$4,552,223
Mini Buses (6)
$115,956
$124,072
$132,758
$372,786
Security System
$7,490
$0
$0
$7,490
Fuel System
$9,630
$0
$0
$9,630
Wheel Chair Tie Downs (27)
$2,696
$2,696
$2,696
$8,088
Money Dump System
$26,750
$0
. $0
$26,750
Tire Machine
$6,740
$0
$0
$6,740
TOO Eauipment
$1,605
$0
$0
$1,605
Computer and Accessories (2)
$3,210
$3,210
$0
$6,420
Service Truck
$26,750
$0
$0
$26,750
Construction Addition (Admin Building)
$96,300
$0
$0
$96,300
Bus Stop Signs and Bus Stop Poles
$5,136
$0
$0
$5,136
Change Machine
$2,354
$0
$0
$2,354
Fiber Optics (Wiring and Connections)
$5,350
$0
$0
$5,350
Total Planning Costs
$124,103
$130,307
$130,307
$384,717
:=::::::':::fUtg'Nill} PIlOJ.E:o.T:~$$:::,::,::,:=;:,t:\::\=t,::,:;:?::,:t':=:::'t):;=:=:t:':=,'::::::::\t::tt?::=,::=::=:\tt/\\I }:::ii$.l~~~'~~tf rr::'r$n~Zfi~tJ.: ifrti$M4~a~f'
FEDERAL COST
$1,065,465
$1,097,295
$3,595,297
$5,758,057
STATE COST
$133,183
$137,162
$449,412
$719,757
LOCAL COST
$133,183
$137,162
$449,412
$719,757
DOT DISTRICT# 3
CONG.DIST.
2,3 ROC
LC
:~ I
'.
~~
,.
CAPITAL SCHEDULE FOR COLUMBUS TRANSIT SYSTEM
Section 5309
..~===~~~~-~-
DESCRIPTION
.
Transit Coachess (Six 30 foot)
. 500,000
500,000
500,000
1,500,000
1:::~:PR~qiC't~$'ti:ti::iff:l:m:IItf::::::::k:::fi::i?::i:~~:mm:::~::lt:::::~::?:f:I:;?:::::III~ti:$,'b~~b:::~ ::~::::::f:~ti~~i:::::I:$.QQ~~n.ni:: ~:::r:?~:~:::ff:ti$U.I.;'QU.AI ?fft?ii~~::1.1$.QganW;:=
FEDERAL COST
400,000
400,000
400,000
1,200,000
LOCAL COST
50,000
50,000
50,000
150,000
STATE COST
50,000
50,000
50,000
150,000
DOT DISTRICT # 5
CONG.OIST.
2,3 I ROC
LC
UJ
tv
"
CAPITAL SCHEDULE IN COLUMBUS FOR ELDERLY AND DISABLED Section 5310
t~lt~:~:==- ::::$j;lf?-lif:::::::::H11:::ff::::::ffIfff::::::::::::j:::::::fffI:111::::::::11:ff::f:::::j'I::::::::m:::":::::m::: ::':'::::::::::I::::~V::tf.~~f:f::::' t::::::::,::OOggq~I.':::::::'f:f
j;QE$QSIR;mQN::I:iI::'::i::::r,:::,:,:r:':'i'i::::'l'IIt':':'iI:::i:ini;::,:::::::::::::::r,IIIiJII :IIrn'i'i'i\NQmrrrrmm :::'r:::::::::::::i5':J.~::III:rr::
Purchase of Service
$53,308
$53,308
Purchase of Service
$55,973
$55,973
Purchase of Service
$58,772
$58,772
~
:reSQUimlH;ST.iirr:mr=mrrrr=::ttmrirr:::::l:ir:lr::'trr=IIIII :::::trtriimr=HI~Q'Z$.r r:}:':::::m::::ti::r$.4iial~lt l'IIIIIIIi'$4$.UiSOI :::':::'i:i::;ir':::::i$l:aa~$alr
FEDERAL COST
$35,258
$37,021
$38,872
$111,151
STATE COST
$8,615
$9,255
$9,718
$27,788
VJ VJ
DOT DISTRICT # 3
CONGo DIST.
2,3 RDC
LC
-
<lit
MACON
34
CAPITAL SCHEDULE FOR MACON-BIBB COUNTY TRANSIT AUTHORITY
,
Section 5307
u.g'$Q$O~tti.QNtm::i:t}:::::f:':t'j@fffmt:t'j::'::::t:fmt::t'ji:::tt::ttm:t:ttt :':ttt:':::::~'1\n1:i}::t:?:t: :'fff:t:f:tt::::b:::t':t:t':f :'@f@:':::tEM::Q$'tit':f::m f'f'fttt~t~,r:i::::::f:: Srmefftm@'ifllttt:::::t:::t::::@r:t::t:r:t::t::tm'tmfr::::t:::ttt:'lt::ttttt:t :::'frtt3.ftaln.~::::ttt::: m::,@:::::::auan)!wm::t:t: :::::t:fitQOO1=3.7lttlt
Purchase nine 30 ft transit buses
$690,000
$690,000
$690,000
$2,070,000
Administrative Vehicle
$0
$25,000
$0
$25,000
Paratransit Van
$0
$35,000
$0
$35,000
Paint Transit Authority Office
$0
$35,000
$0
$35,000
Resurface Parking lot
$0
$60,000
$0
$60,000
Upgrade Computer Equipment
$0
$0
$45,000
$45,000
Remodel Transit Office
$15,000
$0
$0
$15,000
:R.amase.m:::eQs.m::::::t:t::t:::t::t:t::::'::W:::::t:::fJfW;:::'::::f:'}:t::tt:::::::::::::::: 'H':'::::':::::':':::]$.lQ$~(wP.f f':"'f':t::::::$141Unn.U:m tt'::'f:::::::':::$.73.$~:PQJn ::f:::::mf::s.a~~s.s~Q(wf
FEDERAL COST
$0
$0
$0
$0
STATE COST
$352,500
$422,500
$367,500
$1,142,500
LOCAL COST
$352,500
$422,500
$367,500
$1,142,500
w
VI
DOT DISTRICT # 3
CONGo DIST.
8 RDC
MG
(;
t.
{~
OPERATING ASSISTANCE SCHEDULE FOR MACON-BIBB COUNTY TRANSIT AUTHORITY
SECTION 5307
~ ::~:$.1lU1:MiI:::):f::::f):):::):fI):::}fl:ff::::f::::f::f::fl:::~:::f::)::::t:::::::::::);~:~:)t~t:}::);:~::):::::::):f):f:::1:::: I~~::;):}}faQ.$.:1lo.~tttt:f ~,):~;)t:I;:)$.Q3"U$::;~~)f"t'):
tQRa.B.511RGtBe.BlQiflHtttIfff11ttI;)tt')IH:)'f):)n):::)m~ ~:Httn)I:)~)~R)iQjt)Ht:)HtIt I:iI1HH6Yi:I.t::iH:::::::)HH:!
(07/01/00 - 06/30/01)
$1,735,717
$1,735,717
(07/01/01- 06/30/02)
$1,770,430
$1,770,430
(07/01/02 - 06/30/03)
$1,805,839 $1,805,839
'HRSQiilJf.C1U1QSln;tImt1tttfff)t::mtn:t')tf)Iig):)I):::1:):):lJ itm:ff$1~~Zal~7':il:r H;Ht:):):)$:1Mll:Q~el( f)t:::):)H:)$1MaQSUISSf :)H):):f):)):$fi~a1~~':~$DH
FEDERAL COST
$812,920
$620,550
$708,551 $2,142,021
LOCAL COST
$922,797 $1,149,880 $1,097.288 $3,169,965
....,
0\
DOT DISTRICT # 3
CONG.DIST.
8 RDC
MG
CAPITAL SCHEDULE FOR MACON-BIBB COUNTY TRANSIT AUTHORITY SECTION 5309
f:~T~ SlUUtt:::fJI:fjtfJI@ffif:I:fffj:j{{:::j:::fj{{{{{@fjtf::::::::::f::j:j{{{{{{{I{ ffff::f3DaI:OG\ff:{{: {{:j:::::::::j3P.$.1:~t::I:::fj{i
Qg~n~JlUItJ.N.:I:t:::t:{::rr{Hn:1:rrlIrrr@mr::rl::::::r::lIr:'::::::r:1::::::::1::: ::::::::tlIlIlIaiQllItmn::::r rlIlj::::::l::::5rrtlPl.::::itt:::::::::
Purchase six 30 ft transit buses
$500,000
$500,000
$500,000
$1,500,000
p=aQu.eP1NIQ$.llNflilIlI::mlIMmfNinlIt'lItilI;;tiIIIII11I1 @m:m{:mr@$.iflQ~QQO{ lnt;::;::::;::;:eO-p;OOlf :;1I{H::j@$$U.f.4~~II
FEDERAL COST
$400,000
$400,000
$400,000
STATE COST
$50,000
$50,000
$50,000
LOCAL COST
$50,000
$50,000
$50,000
:1}$.PQnn~t $1,200,000
$150,000 $150,000
W
"-I
DOT DISTRICT# 3
CONG.DIST.
8 ROC
MG
(~
:
-;~
CAPITAL SCHEDULE IN MACON FOR ELDERLY AND DISABLED Section 5310
==='raW s,ng:!JflIIi:!iii:::iJiiii!}i!Iif!@'!'!i!i:Ii!:t:!i:'i!i!if!"!,!!i'i'{iiIi:':i::'i!i!i!!!i'ii{I!!{i!i/!!i!ii!{!/f/I} :iiI{i:ii)'iaMj,<Ja9ii!i/!i:}{i ::ii:i!{{'mlQ.Qil$~:':i!i!ir::i!:
iPE.SGBIPmmNiE::i'iiiIriiiiir:/!r:i':r'::}/!i::ir::r::i:iiii'ii:!i::ii!i!ii:!'::i::,!::::r:::if}/III/ IIIIrrJPlrU1IINriI::i iEri:'::::}:rFMfl2.:'I:r:!}}:
Purchase of Service
$51,257
$51,257
Purchase of Service
$53,820
$53,820
Purchase of Service
$56,511
$56,511
PRQiJEClhe-asmiW!ttltm!ttWt!ttt'ttit!tN::n:tt!i1t!:giWI :'i:::::!:fWlt:::!tn:$$J.lm lWn{;'l:tNl$.$.a~$.gQ: I!i1::::ilt;':1::;:I::::$$.~h"l1!, :t::ji:fi!i}it:I::$I:$1JSII
FEDERAL COST
$41,006
$43,056
$45,209
$129,270
STATE COST
$10,251
$10,764.
$11,302
$32,318
~
00
DOT DISTRICT # 3
CONGo DIST.
8 RDC
MG
ROME
,...
39
CAPITAL SCHEDULE FOR ROME TRANSIT DEPARTMENT Section 5307
::IIrr:RtlNQa:::III:': :g~8.IRIIQNr::~:::::::~:~::::~~r::~~~:::r:::IIII:i:I::III:m::l:::r::~::::II::::III:~: ~:::::I::IIRY:?A1m:::r]:
':::~ii::':':::::::flg$,:':r':~:~:::'::L::~::IIltQT.'-ip:::r~:~:::
j$.mIMftr{:;;;}:;l{{r{{II::':::{II'~::::::::::~:~:~:::~::I::::::r:IIj;I::~I::{]'::"::::~IIII:': '::Il1tgQQa,,~:':'::;:::::~ ::]:{1tgQQgH::I:~:::: ~:::~:~::JigQQa~~:::]::~
Two Transit Coaches
$220,000
$0
. $0 $220,000
One 16 Passenger Administrative Van
$0
$28,000
$0
$28,000
Computer, Printer, Related Items and
Support Equipment
$0
$5,000
$5,000
$10,000
Copier Office Equipment and Furniture
$0
$5,000
$5,000
$10,000
Maintenance Equipment and Tools
$0
$10,000
$10,000
$20,000
Capital Maintenance Items
$0
$50,000
$50,000 $100,000
:PSQU';PJlRI$.!(i:IIII:"::m::@'rrr:::I:n::I:iiillitfJ:JII:r:~ ::I:;::~:::i$.JIQiQar :::m::n:ii::$~'-iQQA~:~: ::III'::r::$tP~Qaii :::::;::::i::::$.,~1I;9ai':
FEDERAL COST
$176,000
$78,400
$56,000 $310,400
STATE COST
o~
LOCAL COST
$22,000 $22,000
$9,800 $9,800
$7,000 $7,000
$38,800 $38,800
DOT DISTRICT # 6
CONG.DIST.
7 ROC
CV
-:
d> .
~
11
OPERATING ASSISTANCE SCHEDULE FOR ROME TRANSIT DEPARTMENT
Section 5307
: t : B :i:i$.;J;J:B)::tt):ii:i):i)i:i:i:i)ii:):::::):i:ii'i::II1:::::i':::II1I:'il:::i:iti:i:IIiIi:iti:ii!:::::::i:!::::i:'f,i i::::,::::mQAQgl~::::II: i'i:i')'i:i::OOOQOgOl.iitt
::;~BlgE:MI::;BiSJ.g!g:::::m::i::::iilII:i::::::i:::::::i:IIIt::: ::::I:::::i::aiM::;QI':::::::iti:::::: :::::::i::':::i::::firttO~m::ti::t
(01/01/01 - 12/31/01)
$1,247,000
$1,247,000
(01/01/02 - 12/31/02)
$1,310,000
$1,310,000
(01/01/03 - 12/31/03)
$1,376,000 $1,376,000
-.j:>.
:::::IIQIIII:KlQliI:::!IIItilt::::::::::::::::::t:i::::::::::::::ii:'i::n:::i:!':::::: :::llt]gIZ;'PIO::::: :::::I:::1l3~:Q~ggq::: ::::I:iliiI;QQQi:::i I$,:::I~I:UiQIQ:::::
FEDERAL COST
$ 377,040 $ 377,040 $ 377,040 $ 1,131,120
LOCAL COST
$ 869,960 $ 932,960 $ 998,960 $ 2,801,880
DOT DISTRICT # 6
CONGo DIS"
7 ROC
CV
CAPITAL SCHEDULE FOR ROME TRANSIT DEPARTMENT Section 5309
i l = = = - ::::$.1l0Jt~::t::ltI::t::::::I:::mttItlm'IIti::::':::::::m:::::::::::::I::::::::::t:::::m:::m':::m:t:m'l]1.lo:o.o.l.mJ:II':: ':'::::I:::lro:o.gl.~:I:t::
:::::u,$.IBIRnINWItti1mlttttiilttHIIIIII:::t::t:t:tM ::ti:tr'5Y::ilj:i::t:'H':i ::::i::':::rr:5Y:':P.lIIlt::
Six Transit Coaches
$220,000 $220,000 $220,000 $660,000
lR.arl4g~I:~.fi;t::iWmimm::::r':m':trt:irrr;Ii;t;m;t@i;II:I:':$.Il1ilQlt t:::::::t~lIilQl:::: ::::::II:::$gGQ41Q1'::: :::::::,:,::m;$llIil'tt::
FEDERAL COST
$176,000 $176,000 $176,000 $528,000
LOCAL COST
$22,000
$22,000
$22,000
$66,000
STATE COST
$22,000
$22,000
$22,000
$66,000
- DOT DISTRICT # 6
CONGo DIST.
7 RDC
',
CV
.;:.
N
'~
'. '0
,,-
w~
!1.~ . -
CAPITAL SCHEDULE IN ROME FOR ELDERLY AND DISABLED Section 5310
= = - imIRWM:mi!i!iff:!fi'i!Ii!@:!!i!i!i!!i@fiI!i:iIifimW!i!i!i:fi'if'I@:fiI !f::ifi'f~YYQg4.f::@':i: !!i:i:i!:rnQrm1:li@@:!
SIIA1I.N.Qi:'RiSIIUl.!!iIIIIIIIIIII'It::i::r:::r:i: ':::'::::'!'::::::FMmQ,:rrr::I'!i :rr::::::rfJ(:::'Q~::::I:I:r:i:
Purchase of Service
$30,754
$30,754
Purchase of Service
$32,292
$32,292
Purchase of Service
$33,907
$33,907
11(t4UiIlIQ$liWWIIIili::::lIIII'::::::::ni::::::::r:::::tm: ::i:::::::::':::::i::::::::$.I"t{~ :m::::II::::::':::::~~~lg ::::i:::;:::l::::':':':~~~QI II::'::::::;:i:::::~~~~
FEDERAL COST
$24,603
$25,834
$27,126
$77,562
STATE COST
$6,151
$6,458
$6,781
$19,391
DOT DISTRICT # 6
CONGo DIST.
7 RDC
CV
SAVANNAH
"", 44
ACCESS TO JOBS/REVERSE COMMUTE PROGRAM FOR SAVANNAH Section 3037
Program Costs
$1,500,000
$1,500,000
Proaram Costs
$1,500,000
$1,500,000
Program Costs
$1,500,000 $1,500,000
"""":!!s<.tf"i;i!;tfl!;.;.Ii!:Pil1ff.,.lol_.!_"Jj~.5~00.f~
$750,000
.j:>.
$750,000
$750,0001
$750,0001 $2,250,000
VI
DOT DISTRICT # 5
CONGo DIST.
HRDC
CG
~\-
~
s-:
CAPITAL SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY Section 5307
:U.i.$.Q.;BlRl.f.QN.rfiti&ttttir:{::::::::f{::{=:{=:mrMfrWtt::iWr::::::t:t, =:::::i:::::t=ttE:::O~}::::::::m{::: t}tt:::=}=~:Qg::::tffff =t}}::=ii::::ff:Y:=P$.:W:}::::::::=d=;t}}t:\'rOl~W:t:::t:;f:: SOOe:JtIWt:WJ:::::::::::::::::::::::=:::tt::JJ:::::::':t::J:::=::Wi=::W:::t:tm::=:::ttrifIJ::::::::rrr::::::j:r:: t=:=:j:t:::::::$."$.03.3.::::::r::::::::=: :=:::t:rfl.p$.pas,:r::r::r:::: wr::::::::mQQQ~?l1::::t:W:::::::
Capital Maintenance Items
$350,000
$500,000
$500,000
$1,350,000
Facility Modification and Improvement
$100,000
$250,000
$100,000
$450,000
Service/Support Vehicles
$41,000
$20,000
$20,000
$81,000
Passenger Amenities
$0
$0
$0
$0
Maintenance Tools and Equipment
$70,000
$50,000
$50,000
$170,000
:Rtt('l.qg~n:Q(l$l1trrt:::::::::rri:::{::f:JJIJtmrr::=:w::::::::::::::::::j=r::Jtt::::r:::::::::::::::::t:Ml:iJmfr:: :J::::::II:rh:.gq4(J~Q]: ::=:j"=IJJ:=:]$.$.ZQ.l(l~Jtj:: :t:=r:JJD~Q$.I:~(JmJ.J
FEDERAL COST
$448,800
$656,000
$536,000
$1,640,800
STATE COST
$56,100
$82,000
$67,000
$205,100
LOCAL COST
$56,100
$82,000
$67,000
$205,100
...
DOT DISTRICT # 5
0\
CONG.OIST.
1 ROC
CG
OPERATING ASSISTANCE SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY
Section 5307
i:ir~ $T,Iy)#,m::,:):::):@!'@::);:)t:::m:;::::t}::::I:f):):@):)'@f;):::::@)I:):@;::):::fff!'@):::::::::;):iIIlff@ff j:::::):):):)Il$.O$.Oa.I}:)i::::::mm:: ::}:::):fft$.'$.I~:::::t;@:}
Q8SBIJ.1ING:::J1ERIQPrr::::rn:r::::::r::::'::@@@@@@liJ::::::::':::':':':I::r::::r l@fI@llEtUU@@@lUr :::,:,@:n):@feJrO'@@@fI@
(01/01/01 -12/31/01)
$8,272,000
$8,272,000
(01/01/02 - 12/31/02)
$8,437,440
$8,437,440
(01/01/03- 12/31/03)
$8,442,910
$8,442,910
-
RRQUaG.llaalWl:r:1l::::::::1l:':::li::rr::::::':::::::::::::rr::r:ill1:ir:::if'r:'r::::i::l::r ::::'::::mn::1$.J.121IiQQQ; ::11::::r:::::$.~n"$.1Mltll r:1l::::::::::::$1344$.1:1 I:::::::::rl$l$.i1:$~i$$n
FEDERAL COST
$1,403,191
$1,400,000
$1,400,000
$4,203,191
LOCAL COST
$6,868,809
$7,037,440
$7,042,910 $20,949,159
.~
-.I
DOT DISTRICT # 5
CONGo DIST.
1 ROC
CG
~
,. )
c,
.~-
CAPITAL SCHEDULE FOR CHATHAM AREA TRANSIT AUTHORITY
Section 5309
=l~t==-- Sit1RUtimrff::;;::::t1::1l@':\f:::W%frmr:n:'I::::;:@ft:'Wnf%::::::W:::11:1'1W :1I{::fr$Q,$~~$:::t:\W1\ '11m':gO:$Q,$;~tt:::;::1
'Qi.$.QfURT.tO:N::;::r::::rr::::::::::::r::r:ttIt:rrrr::rrr:r::::::,:,::'::t::::::rr::rmt rrr:'::::t:ftM::Q1::rrlJt: ::t:r::::':::::eY:Q2.':lllr::
Buses, Trolleys, Facilities and Related Equipment Water Ferries & Equipment
$4,000,000 $500,000
$4,000,000 $500,000
$4,000,000 $500,000
$12,000,000 .$1,500,000
:e:mQa.s.c.m:::$.~s.ro::::::::::r::::::;:::l':':::::::::;:::::::::tttttIt:::::;:::::::':Ii::::::::r:::::::::::tmt::r::Itt"~$4.q;~P'::: ::::'::r:::::::$.4~S.UQ~P~P.i::': :::::i::':'::::::::$4'~$.~P,~qJ)P:I ::::rr$j:~~$~~Q~r
FEDERAL COST
$3,600,000
$3,600,000
$3,600,000 $10,800,000
LOCAL COST
$450,000
$450,000
$450,000
$1,350,000
STATE COST
$450,000
$450,000
$450,000
$1,350,000
DOT DISTRICT # 5
~ 00
CONGo DIST.
1 RDC
CG
CAPITAL SCHEDULE IN SAVANNAH FOR ELDERLY AND DISABLED
Section 5310
=~~- ,
:s.rmg::1.fi:::::::::r:mr:m::::::::::::::::::::::::::::::::::::::IIIIIIIIIJIIIIIJIIIIN1J::J:rrrrrm r::::::lt::$.VI.02~::}:::::fr :::::::::::rim~nJQJ.11tm::::::lr :gt;$OaUiltJPN:::mr::::;:::::ti:itJI::::t:i:::IiWr:::!::::Wlmi:@::!i::f:::::::i:i::i::::::::m::t :!:::!:!:::lillfM::P1:::;::::m:::!:!1:::::! :::::::!:!::::!rr::trf.j:J1.g:::::!::ll:J:::::
Purchase of Service
$78,810
$78,810
Purchase of Service
$77,500
$77,500
Purchase of Service
$81,376
$81,376
:e:aUa.:eCitlPQg:!l:::t::::::l:::::::::I!M:j{::'t:::t::WItrr::::g::Jt:m:::::::IIII !:Im:::!:::::Itir:t$.'t.J.~a,~ :::::::!l:::!::::{{:::::!:t$.:tT:~$.Uo.: ::::::::::{::::{{r::J:$s.11J.:t~ :::::::::::::g::::::it$~;tZa~ss
FEDERAL COST
$63,048
. $62,000
$65,101
$190,149
.j:>.
STATE COST
IQ
$15,762
$15,500
$16,275
$47,537
DOT DISTRICT # 5
CONG.DIST.
1 ROC
CG
~
,~
'1
WARNER ROBINS
"
'50
-,~------------------------------------------------------------------------------,
CAPITAL SCHEDULE IN WARNER ROBINS FOR ELDERLY AND DISABLED
Section 5310
I f ' - 3Ite:::lMI:i:K:;::::!:II:;::::;:::::lm::::E!:IKIIE:IIIE;tlliIIE:IiI :::::;::::ttPQI':II.::!:!::::::: !:::::::IIIOQQUf4::::::::I
.fIJ}~~j~fIl~~~~Hf~~~~lt~~]flIIIIIII~~~~III~~~~IIIII~frrrrrr~I]~j tt:::ItEM])1::::::::::::::::r ::::::::::t:UiY41.amm:I
Purchase of Service
$20,503
$20,503
Purchase of Service
$21,528
$21,528
Purchase of Service
$22,604
$22,604
gRQUill1Gf/$.lii.iI1i::'IlI1MmMWii.nMiflM :nifl::ri$.;gl~IQA :::::!:i.i.::i.i.fH:.:~lg~ :::':::::::::::::I::I$.gl~. :IIIIII::.~g$.
FEDERAL COST
$16,402
$17,222
$18,083
$51,708
STATE COST
$4,101
$4,306
$4,521
$12,927 .
-VI
DOT DISTRICT # 3
CONG.DIST.
2 ROC
MG
-.)
x.,
,.
, ~,
',
..
\.11
RURAL PROGRAMS
..,.
52
.
CAPITAL SCHEDULE FOR STATEWIDE NON URBANIZED AREA TRANSIT Section 5311
P'~IfUQ1Ht 19,~~~~l~e.'~~'~N8Mg'~i(t':(~~~~~~it ~$nw't{t :::'~:":tJ;W{ZQQttt'rr {tttJft:tZQQZ,::ttt: 'r":{:rJf.~QI{'rrr :::,:tt?fPIAPt'rrr
1
Gainsville
1C9005
$265,000
1C9006
$123,000
TOOO041
$
84,000
$472,000
2
Tennille
2C9005
$1,097,000
2C9006
$497,000
TOOO042
$ 344,500
$1,938,500
3
Thomaston
3C9005
$537,000
3C9006
$406,000
TOOO043
$ 172,000
$1,115,000
4
Tifton
4C9005
$408,500
4C9006
$112,500
TOOOO44
$ 331,000
$852,000
5
Jesup
5C9005
$528,000
5C9006
$151,000 .
VI
TOOO045
$ 238,000
$917,000
W
6
Cartersville
6C9005
$740,000
6C9006
$396,000
TOOO046
$ 354,000
$1,490,000
7
Atlanta
7C9005
$0
7C9006
$0
N/A
$0
$0
All
Supplemental
8C9005
$300,000
8C9006
$300,000
TOOO048
$ 300,000
$900,000
All
Intercity Bus
8C9103
$1,363,628
8C91 04
$1,465,212
TOOO049
$1,567,729
$4,396,569
~E=~iErej
~
"
t)
..
.
{.J
~-,
OPERATING SCHEDULE FOR STATEWIDE NONURBANIZED AREA TRANSIT Section 5311
DISIRfOIWf DJSIRlOr:NAME'::::;:,::::::::;::::?? s:rmWtt,??: ?::;::;::':F:anl).f)'f:t :ttttRianO-ifit'f fi}':"':Ef.~3.'f:Jtt :ff:'::\J'DIAl.tlt'f:
1
Gainsville
189005
$437,839
189006
$459,822
TOOO050
$482,814
$1,380,475
2
Tennille
289005
$1,039,388
289006
$1,110,394
TOOO051
$1,187,446
$3,337,228
3
Thomaston
389005
$945,290
389006
$990,097
TOOO052
$1,039,677
$2,975,064
4
Tifton
489005
$197,056
489006
$209,404
TOOO053
$226,736
$633,196
5
Jesup
589005
$300,392
589006
$258,711
VI ~
TOOO054
$272,958
$832,061
6
Cartersville
689005
$1,106,800
689006
$1,133,000
TOOO055
$1,113,000
$3,352,800
7
Atlanta
N/A
$0
N/A
$0
N/A
$0
$0
ALL SUPPLEMENTAL
889005
$600,000
889006
$600,000
TOOO057
$600,000
$1,800,000
:raTAlfCOST.S:':r:::::'f:tt::::'::ffffttfnWtt :"':":'::::::':':::$.4i~il:Q': 1:::::ftt:$.4fl~U~2i. ::::t":t':$.4i~IJ.l~1' ::::f::;::~l4i;HP.~~4
FEDERAL COST (50%)
$2,313,383
$2,380,714
$2,461,316
$7,155,412
LOCAL FUNDS (50%)
2,313,383
2,380,714
2,461,316
7,155,412
CAPITAL SCHEDULE FOR ELDERLY AND DISABLED (Statewide) SECTION 5310
,':..,:..... ::'" ,', }~:~:~:~:~:~:~: I:Hf:t!!:t:::::;:::;~:::::::: ::t;:::::::~:n~~ttt ((:tWf~;;;(( :ttt:r.:l~~~::::;(:::: (((::TQ'l:~!;it::tt
1
TOOO061
$147,621
(15 Counties) 1T000062
$155,002
TOOO063
$162,752
$465,375
2
ITOOO064
$106,615
(13 Counties) TOoo065
$111,946
IT000066
$117,543
$336,104
4
TOOO067
$108,665
, (10 Counties) ITOOOO6B
$114,099
11000069
$119,804
$342,568
5
1000070
$75,860
(11 Coumtes) TOOO071
$79,654
.1000072
$83,636
$239,150
6
TOOO073
$51,526
(15 Counties) 000074
$53,820
000075
$56,511
$161,857
7
000076
$45,105
(11 Counties) 000077 000078
. $47,362
. $49,730
$142,197
VI
8
000079
$73,810
VI
(16 Oounites) 000080
$77,501
TOOO081
$81,376
$232,687
9
Too0082
$75,861
(15 Coumtes) .1000083
$79,654
TOOOO84
10
TOOO085
I (14 Counties) TOOO086
.$75,961
$83,958
$83,636
$239,151
1000087
$88,156
$248,075
11
1000088
$26,654
1 (18 Counties) '1000089
$27,986
IToo0090
$29,386
:1>84,026
12
ITOOO091
:1>344,449
(9 Counties) TOoo092
:1>361,671
1Too0093
$379,755
$1,085,875
~:. ::. :,', .:..:.:'::: .:" :,',.,', ::..}~:~:~:~:~:~:~:~:~~:~:~:~:~:~:f~:~:~:~: ::t::{:::!liJi'::...}I;~ :{:;:\:~~,~ ::::tt::::, :" ;.: .....:;....... ::::::~:;:~{:~i~!i;;j_
CCST(80%)
$ 905,702 $ 954,122 $ 1,001,828 1 :I> 2,861,652
ISTATE COST (20%)
$
226,425 $
238,531 $
250,4571:1>
715,413
LOCAL FUNDS (0%)
0
0
01
0
~
.~
,,"
~)
.i
Proposed and Existing
Georgia Passenger Rail System
Operating
Abandoned
_ _ _---..:C::<.!:S.x
__ _
___..N..Qrt91ILS.QJJ~!ll::f!1.
_ _ _~S~h~o~rt!jD.e,,_L
._..._
Amtrak Service
Commuter Rail
First Priority
Second Priority
w..i_W......GJZ*ilLtim.*'_ ~ ~)
Federally Designated High Speed Rail .
First
Priority
Intercity
Second
Rail
Priority
Corridor
Georgia Department of Transportation Office of Interrnodal Programs
Last Updated April 29, 1999
..
..
"
INTERCITY RAIL PASSENGER ROUTES
GREENVILLE
. . . . . - First Priority Routes
Alternative Routings Second Priority Routes
JACKSONVILLE
Georgia Bicycle & Pedestrian Route Map
.:t.
25 Miles
.'
. .Q .. ......
eMacon
Ii ~o~bJ~s~JII "
;0
"
11:
Ief '8W. ~a"rqn.r..
O
I
bi
'i' ,.
n
S
'~ Jll
m~
~.~ ~_._vannah
. (D
I.
. .... "Vaddosta
East-West Routes
10 Southern Crossing 20 Wiregrass 40 TransGeorgia 50 Augusta Link 60 Athens Link 70 Northern Crescent 90 Mountain Crossing
North-South Routes
5 Chattahoochee Trace 15 Central 35 March to the Sea 45 Little White House 55 Appalachian Gateway 85 Savannah River Run 95 Coastal
Governorls Road Improvement Program
aflie,e
t~ '"cRom\e.
.. Columbus /
. FLF
'" .
N
f
No Scale
~ , ~~
~i~Mc..h.e.
Baxley
~ vCI1n,
s ~- \ ..,
. -.:..Alban
I eI!J .
Blakely
.
so. ." Tift.on
," .:~. .~~ "~". D
..
I -..J':JfIII"'" ..~...... -
"" "
,0 \
.9~
Bainbridge c. ... dl'homasvlBe
.-----.;...---!..al!d!os!t!a ~L_.
Status: Open or Constructing
Preconstruction . . .\ Activities
Rural Public Transportation Programs
Existing
0 City Government
CD Cedartown
@ Social Circle
Unadilla
@ Vienna
Americus
,r,
Lagrange
.
URBAN TRANSIT SYSTEMS
6 . -4.-~
.~
orne Transit System
C bb Community Transit
Athens Transi
MARTA Dou las County Rideshare
Augusta Public Tr nsit
If
Macon-Bibb County Transit Authority .
Colu bus Transit System
Albany Transit System
i.,.~
"
I~
-c I L-
C
.-..c-.o..
0.-...
a. en
00 ZO-
:QE) :..E......
..."
..c::
co
~.
c c co c>o
.(-J
e3n:
c
C/)
::J
mL-