u.s. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION Georgia Division
61 Forsyth Street, S.W., Suite 17TIOO Atlanta, Georgia 30303 June 20, 2001
IN REPLY REFER TO:
HTM-GA
Mr. J. Tom Coleman, Jr. Commissioner Georgia Department of Transportation No.2 Capitol Square, S.W. Atlanta, Georgia 30334-1002
Dear Mr. Coleman:
Subject: Interchange Justification Report Project No. NH-STP-75-3(203), Gordon County
This is in response to your letter of April 16, 2001 which transmitted an Interchange justification Report for our review and approval. Revisions to the report, which resulted from discussions with your staff, were received on June 18. The request is to add a new interchange on 1-75 approximately 1.9 miles south of SR-53.
Based on an engineering and operations review, the access request is considered acceptable. If there are no major changes in the design of the proposal, final approval may be given upon completion of the environmental process.
If you have any questions, please contact Floyd Moore at (404) 562-3654.
Sincerely,
Larry R. Dreihaup, P.E. Division Administrator
cc: Annette Eason, ODOT Office of Planning
/'
(I
BACKGROUND
NEED & PURPOSE
'}
"
<:, ..
TRAFFIC FLOW ANALYSIS
DESIGN CONSIDERATIONS
RECOMMENDATIONS ROJECT LOCATION MAP
NTERCHANGE SPACING IAGRAM
,i~~~f~ltt~;tRAFFICDIAGRAMS
1:,:,.:;~~i~:~j~'{{~#%iiJ'.~I::~
bj<)~!2.i.l,::.;~,;j:f":E.;,,(.:~:~;{t.i;;t.,,.~J.t_AP,AC~ITY
~ ANALYSES.
..
:~
<~.-;
~j
~_.>:._,~"""=..:=::...~. .:. ..;,~;_;_.~::.......;.;;..=:.;::=.:.:...:..:..=~_.=~""~~~~_ ,'-_.....:..:.:....:::..=.~.,..::o:.:....~=.:-~.
PROPOSED BREAK IN ACCESS ON 1-75 AT UNION GROVE ROAD
GORDON COUNTY, GEO"RGIA
Georgia Department of Transportation Office of Planning January 3, 2000
BACKGROUND
The Georgia Department of Transportation is requesting approval for an access break on 1-75 in Gordon County between Exit 306, Folsom Road and Exit 312, Fairmount Highway. The location of the proposed interchange is shown below and Tab 6. The proposed interchange is located in southern Gordon County, north of the Atlanta metropolitan area, and south of the Chattanooga urbanized area. The interchange project has been identified in the Department's work program as project NH-STP-753(203), PI 610870-. A companion project, STP-00MS(7), PI 662510-, is for improvements on Union Grove Road. The companion project will improve Union Grove Road in the area of the proposed interchange and add new location sections to the west and east, tying to SR 53 at both ends, forming a south bypass for the city of Calhoun.
I
~
,I
~
..
.I
NEED AND PURPOSE
The primary purpose of the proposed interchange addition is to provide direct access to Interstate 75 from the Tom B. David Field airport and the industrial park area. As proposed, the interchange, in conjunction with the proposed improvements to Union Grove Road, would provide an alternate routing for SR 53, acting as a bypass for through vehicles traveling through the south Calhoun area.
In 1992, transportation planning studies were conducted for both Gordon County and the City of Calhoun. The studies indicate that SR 53 in the vicinity of 1-75 will become extremely congested in the future. The development along SR 53 in the area of 1-75 is mostly retail and restaurants, which generate many turning movements, causing delays to through vehicles. Both the county and city plans recommend the implementation of the interchange. The bypass and interchange are identified in the Short Term Work Program of the City of Calhoun's Comprehensive Plan.
Union Grove Road is the center of over 3,000 acres of zoned industrial land uses. It is also adjacent to the Tom B. David Field airport, which is also scheduled for expansion. The proposed roadway improvements and interchange will serve these areas and divert truck traffic from using the SR 53 interchange. The closest access south of the industrial area on 1-75 is approximately two miles south of Gordon County in Bartow County. Union Grove Road is located approximately 2.31 miles south of a rest area on 1-75. Daily vehicular and truck trips generated by the industrial area is projected to be as much as 25,000 additional vehicles per day in the area in 2010.
Currently, east-west traffic movements from 1-75 in the southern portion of the City of Calhoun occur on State Route 53. These east-west movements are hampered by the number of driveways and turning movements from vehicles.
Traffic analysis of SR 53 indicates that additional widening would be needed before 2025 if relief is not given to the corridor. Traffic volumes on the existing four-lanes of SR 53 without construction the south bypass and additional interstate access would exceed 40,000 vpd in 2005 and 76,000 vpd in 2025. The levels-of-service would be "C" in 2005 and "F" in 2025, indicating a need to widen SR 53 by 2015. Widening SR 53 to six-lanes would be very detrimental to the area, as many businesses would be severely impacted due to their proximity to the existing roadway.
If a south bypass and new interchange on Union Grove Road are built, traffic would be diverted from the existing SR 53 corridor. Volumes on SR 53 would exceed 34,000 in 2005 and 57,000 in 2025. This will allow an acceptable level-of-service to be maintained along SR 53 until 2025, and widening would not be required. The level-ofservice will be "C" in 2005 and "0" in 2025.
In 1990, Gordon County, which includes the city of Calhoun, had a population of 35,067. To the south of Gordon County, Bartow County (including the city of
...'
Cartersville) had a 1990 population of 55,915. North of Gordon County, Whitfield County, which includes the city of Dalton, had a 1990 population of 72,462.
County
1970 .
1980
1990
Gordon
23,570
30,070
35,067
Bartow
32,663
40,760
55,915
Whitfield
55,108
65,789
72,462
Georgia
4,589,575 5,463,105 6,478,149
,
* U.S. Bureau of the Census, March 1999
** Governor's Office of Planning and Budget, 1992
1998 (est)*
2010 (proj)**
% Change % Change
'80-'90
'90-'98
41,052
50,483
16.62
17.07
71,929
79,747
37.18
28.64
82,039
97,680
10.14
13.22
7642207 8,663,057
18.58
17.97
The table shows the strong growth of the area. All three counties are experiencing fairly rapid residential development. The area adjacent to the proposed interchange and west of 1-75 is changing from agricultural to industrial and manufacturing. The proposed new interchange will divert truck traffic from using the SR 53 interchange.
.j
202: General Information about the State Service Delivery Region Zoning or land Use Changes and Local Development Policies
Name of Development
Type of Development
Coosa Valley Recional Development Center
Bartow County
B1 Gold Kist. Inc
Industrial
B2
Residential
B3
Residential
B4
Residential
BS Northwest GA Pork
Commercial
B6
Industrial
B7Hix Properties
Residential
B8
Residential
B9 mini warehouses
Commercial
B10 townhomes
Residential
B11 office/car wash
Commercial
Zoning or land Use Chanqes
Address
Estimated # of
(Map Attached)
Trips Generated
RedComb Dr Miller Farm Rd Sprino Place Rd Black Rd Hwv 41 N Old Grassdale Rd Big Ditch Rd Grassdale Rd J.F.Harris(cj)Manninq Mill Cassville Rd Cassville Rd
304 454 269 454 1051 101 2056 1585 604 1141 172
Action Taken: (zoning change, site plan approved,
land developed, etc.)
0.99ac R-1 to I-I 5.84ac R-I to R-4 7.22ac A1 to R-1 5.94ac A-1 to R-4 3.908ac A-1 to C-1 3.463ac A-1 to 1-1 96ac A-1 to R-1 12.559ac A-1 to R-3 10.45ac R-1 to C1 9.11ac A-1 to R-3 0.63ac A-I to C1
Catoosa County CA1 CA2 CA3 apartments City of Rlnqqold CA4 Bluffview Subdivision Citv of Fort Qqlethorpe CAS CAG CA7 Colonv L.P.
Residentiai Residential Commercial-Residential
Pine Grove Rd 500 Old Mill Rd 3386 Bovnton Dr
Residential
Bluffview SUbdivision
Residential Residential Commercial
Steele Rd and Aviation Dr Steele Rd and Aviation Dr Lakeview Dr
2189 675 556
100
347 134 100
104ac A-1 to R1 23.3ac A-1 to R1 4.5ac R-l to CoR
Plat approval
10ac R1 to R:2 3ac Rl to R2 R-1 to C-1
Chattooqa County City of Summerville
CH1 motel CH2
Commercial Commercial
S.R. 114 n/ U.S. 27 Nonh Conqress St
176
Zonino Variance
100
R2 to C2
Dade County No chances occurred which indicated 100 or more trios.
Flovd Countv F1 convenience store F2 convenience store F3 car wash F4 church FS F6 F7 propane sales F8 auto sales F9 Neaton Rome
Commercial Commercial Commercial Residential Residential Residential Industrial Commercial Industrial
S.R. 20 @ AL state line U.S. 411(1i:!ALstate line U. S. 27 (ci) Glenwood RD U.S. 27 in Armuchee Blacks Bluff Rd Everett Sennas Rd U.S. 27 ail Primrose Rd Redmond Rd (a) Roqers Or Technoloov Parkway
1250 1250 432 100 100 423 100 1000 353
-
A-R to C-C A-R to CC Special Use Permit in C-C Special Use Permit in SR Subdivison Approval Subdivison Aooroval S-R to LI Special Use Permit in C-C Location Announcement
Gordon County G1 G2 roof truss manufacturino G3 G4 retail flower shoo GS G6
Citv of Calhoun G7 day care center G8 Ouail Run Subdivision
Residential Industrial Residential Commercial Residential Commercial
Residential Residential
Miller's Ferry Rd Oarbv Rd Shope Lake Rd Covmcton Bridqe Rd NiCKelsville Rd S.R. 225 n/Pine Chaoel Rd.
East Belmont Dr Ouail Run Subivision
500 1925 1271 200 1051 1290
150 100
15.89 ac A-I to R-l 149.58 ac A-1 to 1-1 52.092 ac A-I 10 R-1 2.00 ac A-1 to C-1 40.90 ac A-l to R-l 6.90 ac A-' to C-l
0.906 ac annexed R-' 2 ac A-l 10 R1
G9
Commercial
Haralson County No changes occurred which indicated 100 or more trips.
Walker County Wl W2 Meadowbrook Park W3 W4 WS Vulcan Material W6
Residential Residential Residential Residential Industrial Commercial
Pauldine County PAl Golden South Distributors PA2 Industral Bid. Auth PA3 Ransome Develooment PA4 offices/warehouses PAS American Vision PA6 county park PA7 J&N Development PAS utility contracting PA9 JMC Development PA 10 convenience/car wash PA1l N,W, Metro Development PA12 apartments PA13 Lifetime Prooerties PA14 retail PAlS medical/retail
City of Dallas PA16 First Paulding Land Fund PA 17 First Paulding Land Fund
Commercial Industrial Commercial Commercial Commercial Recreation Residential Commercial Residential Commercial Residential Residential Residential Commercial Commercial
Residential Residential
Polk County City of Cedartown
POl real estate office City of Rockmart
P02 Jefferson Southern Core
Commercial Industrial
-
235 West Line si ,
Longhollow Rd Garretts Chapel Rd Hoe Jowl Rd Colbert Hollow Rd Blue Hole Rd U.S. 27(O)Bicentenniai Tr.
Goldmine Rd @l Runnel Rd N, Industrial Bid Baowell Pwv@P, Scrincs Rd S.R. 92@Hunter Rd Seabord Av(O)Rosedale Dr Mt Tabor Rd(a)E. Paulding Dr Mulberv Rock@Bvron Miller Parker@Dalias-Acworth Rd Dallas Nebo Rd(a)S.R.61 S.R.6Hj)Scogeins Rd Cleburne Rd@)U.S, 278 All Hwv(1ilWilbanks Cr Nebo Rd(a)Ashlev Ln S,R.61 raJ Ridoe Rd Ridge Rd(O)Ravlce Rd
Merchants Dr Merchants Dr
John Philips Rd
S.R. ;01
531
2.1 ac I-G to C-2
343 112 146 100 101 1106
plat approval plat approval plat approval plat approval 16.63ac A-1 to 1-1 0,61ac R-2 to C-1
1144 1059 29253 674 497 463 103 301 1512 1418 2486 5969 307 6966 380
2293 2044
6.22 ac R-2 to B-1 9,634 ac R-2 to 1-1 81ac A-1 to B-2 11.104 ac R-2to 8-2 2:342 ac R-2 to B-2 155 ac desionated as a park 2.13 ac B-1 to R-2 2.142ac R-2 to B-2 64.953ac A-1 to R-2 2.644ac R-2 to 8-2 19.49ac 0&1 and 1-1 to R-4 45.832ac B-2 to R-4 8.55ac A-1 to R-2 19.4ac R-2 to NB 7.94ac R-2 to NB
33.9 ac rezone w/stipulations 70ac rezone w/stioutations
202
310ts R-1 to C1
396
Location Anoucement
Policy Type (zoning ordinance, subdivision regulation. etc.)
Road Acceptance
Location (City/County) Bartow County
Local Development Policies
Nature of Policy Change
Cannon Court: Cannon Circle: Westminster Drive: Londonberrv Wav: Abinoton Court: Laurel Cove: Cathedral Heiqhts: Green Gable Point; Brandon Ridge: Quail Hollow Drive; Honev suckle Drive Blackbenrv Ridge: Dewbenrv Lane: Peppermill Drive: Shaker Court: Arnebellurn Court: Ventage CourrAztec Wav: Chippewa Wav: Arahaho Drive: Chippewa Drive: Cass Station Pass: Slarliqht Drive: Standard Court: Imperial Court
Gordon Countv City of Calhoun
Hunters Crossino: Oak Hill Place: Walnut Hill Drive Streets of Summer Trace Subdivision
Pualdino County
Saddle Brooke Farms: Saddle Brooke Drive: Steeple: Steeoie Chase Trail: Bridle Court: Saddle Horn Place
Road Closure/Abandonment
Bartow County
Reiect Road
Chaltoooa County City of Summerville
Lee Street Allev
Floyd County City of Rome
Cherokee Street from Hardy Avenue to Nixon Avenue: portion of Tolbert Street
Pauldinq County
Lester Road (a.k.a. Timberwood Trail)
Zonina Ordinane Amendment
Catoosa City of Rinccold
i
Minutes of July 10,2000 Council to consider the followinq chances to the Rinqqold Planninq and Zonina Ordinance and Rincnold Subdivision Ordinance: After a brief discussion, a motion was made bv Council Member Bill McMillon seconded bv Council Member J.B. Petty to adoot the followinq chances to the Rinoooid Planning and Zoning Ordinance and the RinQoold Land Subdivision Ordinance pendinq specifications: larqer qreen space between the curb and sidewalk, plavorounds with approved equipment, need more crisscross streets in subdivisions not cut-de-sacs. streetlight specifications and/or approval by the City, pool and clubhouses for larcer apartment complexes, more than one entrance into subdivisions. commercial and residential zoning mixed and contact DOT about the specifications for a buffer zone by the interstate. Vote was unanimous. Motion carried.
Gordon County City of Calhoun
Increased the number of members on the Zoning Advisorv Board from four to five
.J
TRAFFIC FLOW ANALYSIS
The Department prepared traffic projections for the area for both a 'build' and 'no-build' scenario. The build scenario also includes the extension of Union Grove Road to form a south bypass of the City of Calhoun. Capacity analyses were prepared using the basic, 'no-build' scenario and the 'build' scenario.
The 2005 and 2025 'build' conditions were analyzed for the 1-75 mainline. These analyses were conducted using software and methodology from the Highway Capacity Manual.
The weaving length between the proposed interchange and interchanges north and south of it is greater than 2,000 feet. The Highway Capacity Manual indicates that weaving lengths of greater than 2,000 feet do not need to be analyzed; therefore, the weaving analysis was not performed.
EXISTING NUMBER OF LANES
Currently, Interstate 75 is three lanes in each direction. The Department has recognized a future need for 1-75 in this area to be widened to four-lanes in each direction, however these projects have not yet been added to the Department's work program.
State Route 53 is currently four lanes wide from before the proposed western terminus of the south bypass, to approximately one mile east of the 1-75 interchange. The road then tapers to two lanes and will remain two lanes wide to beyond the intersection of the eastern terminus of the south bypass. The Department currently has a project under construction on SR 53 at 1-75 for an interchange improvement that will widen the bridges over 1-75 and add additional turning lanes for traffic traveling onto the interstate.
Union Grove Road is currently two lanes wide. Using the projected volumes under the "build" conditions, the south bypass will be four lanes in width from the western terminus at SR 53, and easterly to beyond 1-75. Existing Union Grove Road will be widened to four.lanes as part of this project.
COMMUNITIES SERVED
Portions of the proposed interchange and south bypass will fall within the city limits of Calhoun, and will serve the areas south of the downtown Calhoun area: The south bypass will also improve access for rural areas of southern Gordon and northern Bartow Counties.
"
DISTANCE BETWEEN INTERCHANGES
The proposed Union Grove Road interchange is located approximately 4.60 miles north of the Folsom Road (SR 140) interchange in Bartow County and 1.97 miles south of the SR 53 interchange in the city of Calhoun. The following tables show the center to center interchange spacing if the proposed new interchange is constructed. The existing spacing is 6.19 miles (see Tab 7).
PROPOSED INTERCHANGE SPACING
From
To
Spacing (miles)
Cassville-White Road
Folsom Road (SR 140)
9.21
Folsom Road (SR 140)
Proposed Interchange
4.60
Proposed Interchange
Fairmount Highway (SR 53)
1.97
'Fairmount Highway (SR 53) Red Bud Road
2.79
Average Spacing
4.64 miles
(The existing average interchange spacing is 6.19 miles)
MAINLINE ANALYSIS
Mainline 1-75 capacity analyses were prepared for the Basic Condition and the Build Condition. Mainline 1-75 capacity analyses begin at south of the proposed Union Grove Road interchange, and terminate north of the SR 53 interchange. Capacity analyses are attached (see Tab 9).
'-
CROSS ROAD ANALYSIS
Traffic on SR 53 was analyzed both with and without the proposed Union Grove Road interchange in place. Union Grove Road was analyzed with the proposed interchange in place. The capacity analyses are attached (see Tab 9).
;'
DESIGN CONSIDERATIONS
The Office of Road and Airport Design developed a preliminary layout of the proposed new interchange on 1-75 between exits 306 and 312. This layout is a diamond configu ration.
The proposed interchange design will be coordinated with other projects that are currently in the Construction Work Program.
The estimated costs for this project are as follows:
Union Grove Road Interchange
South Calhoun Bypass including Union Grove Road improvements
TOTALS
Right-of-Way Cost Construction Cost
$2,568,000
$6,940,000
$2,179,000
$19,1.78,000
$4,747,000
$26,118,000
ENVIRONMENTAL STATUS
As a part of FHWA approval of new access points on completed Interstate highways, NEPA procedures must be followed. Since only the concept has been developed on the South Calhoun Bypass and interchange project, only preliminary environmental work has been completed to date. A site visit has been made to the project by the environmentalist, and preliminary environmental concerns have been identified. The bypass and interchange projects will be submitted as one document. Environmental concerns are as follows:
Approximately 5.07 acres of Wetlands affected. Nationwide 14 USAC Permit.
No eligible historic resources impacted. 106 required.
Skull Caps known but not impacted. No other known T & E species involved at
this time.
No known eligible archaeological sites.
No parks within project limits.
No known cemeteries within project limits.
No stream channel changes proposed.
The level of environmental analysis will be an Environmental Assessment. Investigation of Underground Storage Tanks and Hazardous Waste Sites has not yet taken place.
.'
RECOMMENDATIONS
The Department requests a break-in-access be approved for 1-75 at Union Grove Road which will serve as the South Calhoun Bypass. This new interchange and south bypass would provide improved access to 1-75 from the 3,000 acres of land zoned for industrial use; relieve future congestion on SR 53 near 1-75 in Calhoun; eliminate the need to widen SR 53 before 2025; give direct access to 1-75 to motorists in the south Gordon and north Bartow county area; and improve access to the regional airport.
It is the Department'sopinion that beyond an additional interchange, no other feasible alternatives are available to adequately address this growing area's existing and future transportation needs.
:, ..
PROJECT LOCATION MAP
,"
o
2
SCALE IN MILES
BOURCE:GENERAL HIGHWAY MAP,GORDON CO. GEORGIA PREPARED BY THE GEOIlGIA Df;PARThlENT OF TRANSPORTATION,I99'l
LOCATION
STRIP MAP.,.....
STP-OOMS(7), NH-STP-75-,.3(203) SOUTH CALHOUN BYPASS
GORDON COUNTY
P.I.# 662510 & 610870
()V2~/~~
INTERCHANGE SPACING DIAGRAM
z
o
- '-....
o
:\
INTERCHANGE SPACING DIAG
Proposed Union Grove Road Interchange and South Calhoun Bypass
1! ;/
TRAFFIC DIAGRAMS
"I
SHEET 1 or
1270001 16000
S. IND. BLVD.
(a 1000 1
48000
SR 53
1225001 13000
<790001 46500
(79500) 46500
(76500) 45000
( 14000) 9000
o
0:
a
o'"
0:
g ( 10500)
a: 6500
BASIC CONDITION
; 121000) '"
12000 .~..
0:
'"
SALE~ RD.
(40001 2500 FLOWER RO.
o 1100001 0:
6000 ~
IN]
1
11075001 63400
(20000) 11500
(9000) 5500
UNleN
(6500) 3500
CROVE RD.
T
<520001 30500
u0:
(152501 ~ ,9750 0
.oo
.J .J W <D
OU7LET MALL
(27750) 5250
16250) 3500
(6000) 3250
(5000) 2500
GEORGIA DEPARTMENT OF TRANSPORTATION OFFICE OF ENVIRONMENT ILOCATION
(262501 14500
.o
0:
o
.J
5
ci
:l:
'"
IM-75-312031 STP-OOMS(7) P. 1.11 610870
6. 662510
GORDON COUNTY
UNION GROVE RD ., 1-75
2005 ADT 000 2025 ADT (000)
T = 71.
24 HR. T = 101-
:gq S. U. = 31.
COMB. = T1.
'---------------------------------------------------
d:/rgl/traffic.dgn/610870.dgn Apr. 20, 1999 08:01:07
SHEET Z 0, ,
( 75500) 45000
SA SJ
(73500 ) 43500
(67500) 40000
(64500) 38500
(26000) 15500
( 15500) 9000
S. IND. 8LVO.
(230001 13500
(4000 ) 2500
fLOWER RD.
ao:
~
..ao:
'",
:l:
( '4000 1 ~
8000 a:
ALTERNATE CONDITION
1M
(112000 ) 66000
r
(21500) 12500
( 15000) 6500
ao:
..a:
SALE'" RD.
.:1
;
VI
., (21500 )
:> "-
12500 a:
VI
(145001 6500
UNION
143500 ) 26000
au:
(21250) 12000
( 13250) ci
8500 a:
0 0 0 ~
-' -'
W <D
OUTLET MALL
(7250) 4250
GEORGIA OEPARTMENT OF TRANSPORTATION OFFICE OF ENVIRONMENT ILOCATION
(19750 ) 11250
g..
o
oJ
5
:l:
(7000 ) 4000
( 15000) 8000
i 12500) ~ 1250
IM-75-)(203) STP-OOMS!71 P.J,# 610870
& 662510
GORDON COUNTY
UNION GROVE RD. lJ 1-75
200S ADT DOD 2025 ADT (000)
= T 7'1.
24 HR. T 10",t S. U. = 3'1. COMB. = 7'1. :/~
d:/rgl/traffic.dgn/610870.dgn Apr. 20, 1999 08:01:30
SHEET J or ~
2005 2025
ADT ADT
==(
000 000)
'I (61500) U" 161'001
36250
}6Z~O
"",J -t.,
9150
9150
-
1)8 22 SA
50~'1~122O50 Y'"(/1~442276558000g1 ~
\...
1\~~So'O"t I 2jjs'go~I1260001
10~0~
'2'~00~'I'PO~2'~001
15 S?
6 00
12650
"25 $R 53
0
-
'HW...J. HS'V'W8' _c,e2S01~e8J1SSO5QI
22500
12(50)
150
~li(f~6 ~81 ' S011'24H0500OJ::::
::-
---J?600 152'>0
01_
I
I
"
l<2U&5105001 /
'l1~'\ ~'1l'8ii'
2025 2025
AM PM
DHV DHV
==(000000)
CEORCIA DEPARTMENT Of TRANSPORTATION OfFICE OF ENVIRON~ENTILOCATION
BAsrc CONDIT/ON
'ma8' 'm68'
- Img'--.-;...---il------I~~S8'UN I ON GROVE RO.
- 'm8'--------:=I==+:=-------'m8'-
-,m, - - -i l_ ---'m'-
UNION CROVE RD.
- 1m' --------:=+==+:=------- 'm' -
1"'-75-3(203 ) STP-00MS(71
P. I n 61 0870
~ 662510 GORDON COUNTY
= UNION CROVE RD. " 1-75 2005 AOT 000 2025 AOT (000) T 71= 24 HR. T = 10'1. S.U. 3'1. COMB. = 77. :/'},
d:/rgl/traffic.dgn/610870.dgn Apr. 20, 1999 08:01:41'
-
SHEET OF
2005 2025
ADT ADT
==(O0O00Ol
2025 AM DHV = 000 2025 PM DHV = (000)
GEORGIA OEPARTMENT 0F TRANSPORTATION OFFICE OF ENVIRONMENT ICOCATlON
I ~l~g8' ~ r ~6~g8 I
A 1\'02501 11602255001
'
62'50
- [2'18255000'...........,':t1:M:2'2.022855~'00/ 1'?~g5g''m ..0.gL1-g03.0'.0.~0L..8.lg50g"g-'0'21000101502l01~'Hg'SRg8S3'_
-1?n~81----=::::::1.. -~ SR 53
' '2~000 0 112501
'~500' ,pO
',261205000"
11182155-R-=:.-..-.-.-1'2200000 00'_
I
(3500 111250)
I 2 / 750
.
.
250"
'565g8'
'.
(<1501 J,OOO \
r1/<750' lOOO
ALTERNATE
'u'156000' 156000'
llOOO )'000
.16l550000
6l550000 I
-
~OO :&l~ '7 140001
(~~~8g'
2 I 50
I
,
I'J1O00O0OI-----:'8:5:0r'I0J05~0.5J1.050 000
In~g)'
<9250' __
50r-- 5000 '650 UNION GROVE RD.
---11JOOO'~ llls5 (~j60)
j
00 1
'~~68~(~&6gl-
1000
1)250 I <501 0 0 0 0 ' 0 '3'7pg0lll050000'
1100 ' \
149500)
""
"250'
zzoc
r " 29500 1/'2501 co
15)750' 31100 (S'7501
)1100
I7I
I
(~m'7Im6)
A- 1\225,
c: .'
!: .<
1600'
600
1225 15100)
,
.. ,
/
4150
"-.122S)
0'(
"15'/.. I
(1000' 125
.
-';~gg)----ro=o=orlmi2Z26"5~1~~J6~1 11.4752'650'0'-------
113501_ S1A12553
'mg~(~m' 'a56'~'m6'- SA 53
_12900'~. n 1100
111I00/1l5,,0 '
'<.4'05"'10500 '
250
111501
I I CONDITION
VIii' 5100
'118'
1M
1
15650 I ('lISOO I
'500 5650
' 6 6257 5 1 1 j ( 6 26155 '
(49751
'-
-':m'~1615L'0U15S~100UNION fJ751~/OOI 3815
"25 200
18001
JO~ "'-1200)
(42'51 HS f
751~
I1J0r0<~:OJ
_
1000
GROVE RD.
- I'0l5'0 251~''( J12T0~5510)"2155'
I I ''50 I
f l~8 1:;:;::---- t '101~O l _
1l2;1''-111/2551
22 ' \
"\
I ~gg'
Il815' /
49v7$igg)
IM-75-3 ( 203 J
STP-OOMS(7) P. ).# 610870
6. 662510 GOROON COUNTY
UNION GROVE RO. ~ 1-75
2005 AOT = 000
2025 AOT = (0001
T = 77. 24 HR. T = 101.
= S.U. 31. RGL
COMB. u 77. (1/9
d:/rgl/traffic.dgn/610870.dgn Nov. 24, 1999 10:36:20
..
SHEET 1 OF 2
11)500 I ""00' r150 1150
I
110000'1100001 5900 5900
r'~~8g'
1150 I )50
mg '.,;>--' mg' --oo:<:::~
I sao)
150
;;
wz
'" I HIZ501 .nlle2~OI
9100 cr gTOO
v>
.'o"
(iJg88' ,U888 I
. "~OOI 8 "5;0):
HiS
2625
'mg' 'm8' ~
1:1 'm' I<oog' lllOOO) 7000 GROVE
--
--
=::21:,1U95000'2'gJ550~00') OO53O50o:X'2'65 TSJ6'OJ~5~ O)0 ,
n
5g'
soo
ROAD
J I
'rm ..25g' "750
'JOOO'------.::::::.JOO'
7000
'1150)
'~~OoO"
'~26~00)
'~~~g~
'Hag)"OOO)
500
~15'75500,107'50
1100 '\.
-;/ 500
H\
-, 'm88' /
~ ' m8'
:c,
'" (11501 \D 111501 IS 15 cr IITS IU I
'?888 ,~ '~gggl 1:Ji I
'm'
t62255 f " 51105 ) a
I iggg) ~ '~ggg I
>v> 0", 0: 00:
SU
z
::>
d:/rgl/traffic.dgn/662510.dgn Nov. 24, 1999 13:29:08
CEORCIA DEPARTMENT OF TRANSPORTATION OFFICE OF ENVIRONMENT ILOCATION
ALTERNATE II
CONDITION
--.
[NI
I
"0250' ~150 . (102501 S750
STP-QOMS(7) IM-75-3(203) P. I.tt 662510
6. 610870 GORDON COUNTY UNI ON CROvE RD. a I - T5
= 2005 ADT 000
2025 ADT a (000)
24 HR. T = 101.
S.U. = 31.
COMB. 71. AG'
I' /9
SHE! 2 or 2
GEORGIA DEPARTMENT OF TRANSPORTATION , OFFICE OF ENVIRONMENT ILOCATION
"w
'n'g.'>--
:;
a:
'"
!
-J
'"
~ :-sc
'mg' :"'mg' v>
(r88' ~ (~ggl
I; I
.'z"
cr ,
U ::I
14500 I 5650
, /1J
(i~6I'OOg'5l25Is0'
ao: r
~~
IW ~u' "lS''''", liS
'm' ~"'n6' V1
'm' 'm' 0
'mg'--=7 r GROVE
42 'l0O8'
6 T5 .tOOO 11050'
M "'25,---=-825
'8001Hl~~~1l'JSoe T~ "~~50'
240 'ZOl50 0
1075
700
ROAD , 'Hg'
'16~g'
'Z25':::o--"000'~'6TO'
Ji
'so'
100
1,:", "g'e 16l~''''''
'i!'l8oO'I?----
';68'
--E--
',g'
-----="'5551
'm'
EXT.
'HI
~:::---'H2SS' - -
1050
-1J-7~' "27~5' 22 ' \
'225' 50
/ 'nl~'
31;"115) '25
115
---.. l80 "60'
1901 GO
'~8''3V0'lg'
---... 295 1165)
<J5' 6S 1 20 .l
85
','N')O
) - - .'5.68'
'~ggl : 1/'~gg'
Ieo
gI
r
'W~'
'fgg': ')68'
.1 u I
'm' ~",'m'
~: u
5
'~W'
16501 12Z5
"::>
ALTERNATE I I CONDITION IN!
J
5TP-OOMS(7)
IM"-75-312031 P.I.n662510
&. 610870 GORDON COUNTY
UNION GROVE AD. (J 1-15 2025 AM OHV 000
2025 PM DHV a (000) T ~ 77.
d:/rgl/traffic.dgn/662510.dgn Nov. 24, 1999 13:29:26
Mainline 1-75 Capacity Analyses Summary
North/South
North/South
Northbound through movement enterin interchange Northbound through movement exitin interchange Northbound through movement enterin interchange Northbound through movement exitin interchan e Southbound through movement entering interchange Southbound through movement exitin interchange Southbound through movement enterin interchan e Southbound through movement exitin interchange Ramp to Northbound 1~75
Ramp to Northbound 1-75
Ramp to Southbound 1-75
Ramp to Southbound 1-75
2005 AMJPM Without improvements
C
2025 AM/PM Without improvements
D
2025
-AM With improvements
D
2025
AM With improvements
E"
2025
PM
With improvements
C
2025
PM
With improvements
C
2025
AM With improvements
C
2025
AM With improvements
C
2025
PM
With improvements
D
2025
PM
With improvements
D
2025
AM With improvements
D
2025
PM
With improvements
C
2025
AM
With improvements
C
2025
PM
With improvements
D
.J
.J
SR 53 Capacity Analyses Summary
Richard Rd.
1-75
2005 With improvement
C
Richard Rd.
1-75
2025 With improvement
E
Richard Rd.
1-75
2005 Without improvement
C
Richard Rd.
1-75
2025 Without improvement
F
1-75
Bellwood
2005 Without improvement
B
1-75
Bellwood
2025 Without improvement
B
1-75
Bellwood
2005 With improvement
B
1-75
Bellwood
2025 With improvement
C
Richard Rd.
Bellwood
2005 With improvement
C
Richard Rd.
Bellwood
2025 With improvement
D
Union Grove Road Signalized Intersections (2025 with improvement)
Ramps east of interchange Ramps east of interchange Ramps west of interchange Ramps west of interchange Marine Road /Mohawk Ind. Marine Road /Mohawk Ind. CR 68/Belwood Rd. CR 68/Belwood Rd.
AM
c
PM
D
AM
B
PM
c
AM
c
PM
C
AM
C
PM
C
,J
HCS: Freeways Release 3.1b
10ne: -mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _OPERATIONAL PLANNING ANALYSIS
_
Lghway/Dir. Travel:
rom/To :
Jency or Company: .iaLys t : 1alysis Time Period: lrisdiction: 1alysis Year: :ite Performed:
I 75 without
2025 6/14/01
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME
_
Jerage Annual Daily Traffic, AADT ~oportion AADT During Peak Hour, K ~rcent of Traffic in Peak Direction, D oLume , DDHV ~ak-Hour Factor, PHF 1mber of Lanes, N er r-a i n Type
Grade Segment Length rucks and Buses ~ucks and Buses PCE, ET ~creational Vehicles ~creational Vehicles PCE, ER ~avy Vehicle Adjustment, fHV ~iver ~opulation Adjustment, fp ~rvice Flow Rate, vp
107500 0.09 60 5805 1. 00 3 Level 0.00 0.00 5 1.5 2 1.2 0.97 1. 00 1991
vpd % vph
% mi % %
pcphpl
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _FREE-FLOW SPEED
_
~ee-Flow Speed:
Measured
FFS or FFSi
70.0
mph
arie Width
12.0
ft
:ine Width Adjustment, fLW
0.0
mph
Lght-Shou1der Lateral C1ea~ance
6.0
ft
:iteral Clearance Adjustment, fLC
0.0
mph
1terchange Density
0.50
interchange/mi
1terchange Density Adjustment, fID
0.0
mph
1mber of Lanes, .N
3
1mber of Lanes Adjustment, fN
3.0
mph
jjusted Free-Flow Speed
70.0
mph
Adjusted free-flow speed cannot be less than 55 mph.
_.'_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _RESULTS,
rvice Flow Rate, vp justed Free-Flow Speed, FFS erage Passenger-Car Speed, S .mber of Lanes, N .n s i t.y , D Nel of Service, LOS
:1991 70.0 64.9 3 30.7
D
_
pcphpl mph mph
pc/mi/ln
.. HCS: Freeways Release 3.1b
hone: -mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _OPERATIONAL PLANNING ANALYSIS
_
ighway/Dir. Travel: rom/To: gency or Company: nalyst: nalysis Time Period: urisdiction: nalysis Year: ate Performed:
I-75 (without)
2005 6/14/01
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME,
_
verage Annual Daily Traffic, AADT' roportion AADT During Peak Hour, K ercent of Traffic in Peak Direction, D olume, 'DDHV eak-Hour Factor, PHF umber of Lanes, N errain Type
Grade Segment 'Length
rucks and Buses rucks and Buses PCE, ET ecreational Vehicles ecreational Vehicles PCE, ER eavy Vehicle Adjustment, fHV river Population Adjustment, fp ervice Flow Rate, vp
63400 0.09 60 3424 1. 00 3 Level 0.00 0.00 5 1.5
2 1~2 0.97 1. 00 1177
vpd
%
vph
% mi % %
pcphpl
_________________FREE-FLOW SPEED
---'-
_
Lee-Flow Speed:
FFS or FFSi ane Width ~ne Width Adjustment, fLW ight-Shoulder Lateral Clearance ~teral Clearance Adjustment, fLC ~terchange Density ~terchange Density Adjustment, fID ~mber of Lanes, N ~mber of Lanes Adjustment, fN jjusted Free-Flow Speed
Adjusted free-flow speed cannot be
Measured 70.0 12.0 0.0 6.0 0.0 0.50 0.0 3 3.0 70.0 less than 55
mph.
mph ft mph ft mph interchange/mi mph
mph mph
~_---,-
ervice Flow Rate, vp .djusted Free-Flow Speed, FFS
verage Passenger-Car Speed, S 'umbe.r of Lanes, N -en s i t.y , D level of Service, LOS
RESULTS
1177 70.0 70.0 3 16.8
C
_
pcphpl mph mph
pc/mi/ln
l ; .~ "
j
,~ ,
HCS: Multilane High~~Ys R~ie~se 3.1b
)hone: ~-mail :
_____________~
Fax: OPERATIONAL ANALYSIS
lighway: malyst: 'rom/To: malysis Year:
length:
la t e :
1-75 Mainline(North/South)
2025 AM (through) 4/ 6/ 01
___________________FREE-FLOW SPEED
Direction ree-Flow Speed:
FFS or FFSi edian Type edian Type Adjustment, FM ane Width ane Width Adjustment, FLW ateral Clearance:
Right Edge Left Edge Total Lateral Clearance 3.teral Clearance Adjustment, FLC :::cess Points per Mile :::cess Points Adjustment, FA :1justed Free-Flow Speed
1
Measured
60.0
mph
0.0
mph
12.0
ft
0.0
mph
6.0 6.0 12.0' 0.0 0 0.0 60.0
ft ft ft mph
mph mph
~_
_
2
Measured
60.0
mph
0.0
mph
12.0
ft
0.0
mph
60
ft
6.0
ft
i2.0
ft
0.0
mph
0
0.0
mph
60.0
mph
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME,
Direction
Lume , V
~ak-Hour Factor, PHF ~ak 15-Minute Volume, v15 unbe r of Lanes .rr a i,n Type
Grade Segment Length ucks and Buses ucks and Buses PCE, ET creational Vehicles creational Vehicles PCE, ER avy Vehicle Adjustment, fHV iver Population Adjustment, fp rvice Flow Rate, vp
1
4975 1. 00 1244 3 Level. 0.00 0.00
7
1.5
o
1.2 0.97 1. 00 1716
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _RESULTS
Direction
1
vph
%
ml
% %
pcphpl
2
3875 1. 00 969 3 Level 0.00 0.00 7 1.5 0 1.2 0.97 1. 00 1337
2
_
vph
%
mi %
%
pcphpl _
er v i.c e Flow Rate, vp )justed Free-Flow Speed, FFS rg. Passenger-Car Travel Speed, S eve I of Service, LOS
sn s i t.y , D
1716 60.0 58.0
D
29.6
pcphpl 1337
mph
60.0
mph
60.0
C
pc/mi/ln 22.3
pcphpl mph mph
pc/mi/ln
'\. .~ \ : J
,
HCS: Multilane Highways Release 3.1b
.ione : -mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _OPERAT10NAL ANALYS1S,
_
Lghway:
'iaLys t : com/To: 1alysis Year: eriqt.h :
~te:
1-75 Mainline (North/South)
2025 AM (out) 4/6/01
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _FREE-FLOW SPEED
_
Direction cee-Flow Speed:
FFS or FFSi ~dian Type ~dian Type Adjustment, FM ane Width ~ne Width Adjustment, FLW ~teral Clearance:
Right Edge Left Edge Total Lateral Clearance lteral Clearance Adjustment, FLC :cess Points per Mile :cess Points Adjustment, FA jjusted Free-Flow Speed
1
Measured
60.0
mph
0.0
mph
12.0
ft
0.0
mph
6.0
ft
6.0
ft
12.0
ft
0.0
mph
o
0.0
mph
60.0
mph
2
Measured
60.0
mph
0.0
mph
12.0
ft
0.0
mph
6.0
ft
6.0
ft .
12.0
ft
0.0
mph
.0
0.0
mph
60.0
mph
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME
_
Direction
oLume , V
~ak-Hour Factor, PHF ~ak 15-Minute Volume, v15 .imber of Lanes ~rrain Type
Grade Segment Length Lucks and Buses Lucks and Buses PCE, ET .~creational Vehicles ~creational Vehicles PCE, ER ~avy Vehicle Adjustment, fHV Liver Population Adjustment, fp ~rvice Flow Rate, vp
1
5650 1. 00 1413
3
Level 0.00 0.00
7
1.5
o
1.2 0.97 1. 00 1949
vph
%
mi
% %
pcphpl
2
4175 1. 00 1044
3 Level 0.00 0.00
7
1.5
o
1.2 0.97 1. 00 1440
vph
%
mi
% %
pcphpl
_ _ _ _ _ _ _ _ _ _~
RESULTS
_'__
_
Dir~ction
1
2
, rvice Flow Rate, vp j~sted Free-Flow Speed, FFS .g. Passen<;rer-Car Travel Speed, S
vel of Service, LOS nsity, D
1949 60.0 56.6
E
34.5
pcphpl 1440
mph
60.0
mph
59.8
C
pc/mi/ln 24.1
pcphpl mph mph
pc/mi/ln
HCS: Multilane Highways Release 3.1b
orie :
nail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _OPERAT10NAL ANALYS1S
_
~hway:
alyst: om/To: alysis Year: ngth: te:
1-75 Mainline (North/South)
2025pm (through) 4/6/01
--:
FREE-FLOW SPEED
_
Direction ee-Flow Speed:
FFS or FFSi .d i an Type .d i an Type Adjustment, FM one Width ,ne Width Adjustment, FLW i t.er a I Clearance:
Right Edge Left Edge Total Lateral Clearance i t.e r a L Clearance Adjustment, FLC ;cess Points per Mile ic e s s Points Adj us tmen t, FA Ijusted Free-Flow Speed
1
Measured
60.0
mph
0.0
mph
12.0
ft
0.0
mph
6.0
ft
6.0
ft
12.0
ft
0.0
mph
0
0.0
mph
60.0
mph
2
Measuroed
60.0
mph
0.0
mph
12.0
ft
0.0
mph
6.0 6.0 12.0 0.0 0 0.0 0
60.0
ft ft ft mph
. mph mph
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME.
_
Direction
oLume , V
~ak-Hour Factor, PHF ~ak 15-Minute Volume, v15 ~mber of Lanes 2rrain Type
Grade Segment Length rucks and Buses rucks and Buses PCE, ET ecreational Vehicles ecreational Vehicles PCE, ER eavy Vehicle Adjustment, fHV river Population Adjustment, fp ervice Flow Rate, vp
1 3875 1. 00 969
3 Level 0.00 0.00
7
1.5
o
1.2 0.97 1. 00 1336
vph
% mi % %
pcphpl
2 4975 1. 00 1245
3 Level 0.00 0.00 7 1.5 0 1.2 0.97 1. 00 1717
vph
%
mi %
%
pcphpl
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ RESULTS
-r-r-r-
_
Direction
1
2
cvice Flow Rate, vp .justed Free-Flow Speed, FFS J. Passenger-Car Travel Speed, S vel of Service, LOS
flsity, D
1336 60.0 60.0
C
22.3
pcphpl 1717
mph
60.0
mph
58.0
D
pc/milln 29.6
pcphpl mph mph
pc/mi/ln
HCS: Multilane Highways Release 3.1b
.one: mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _OPERATIONAL ANALYSIS
_
.ghway: .aLy s t : om/To: ia Ly s i s mqt.h : i t.e :
Year:
I~7S Mainline (North/South)
202Spm (out) 4/6/01
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _FREE- FLOW SPEED
--'-
_
Direction :-ee-Flow Speed:
FFS or FFSi sdi an Type ~dian Type Adjustment, FM :me width ~ne Width Adjustment, FLW ~teral Clearance:
Right Edge Left Edge Total Lateral Clearance 3teral Clearance Adjustment, FLC ccess Points per Mile ccess Points Adjustment, FA djusted Free-Flow Speed
1
Measured
60.0
mph
0.0
mph
12.0
ft
0.0
mph
6.0
ft
6.0
ft
12.0
ft
0.0
mph
o
0.0
mph
60.0
mph
2
Measured
60.0
mph
0.0
mph
12.0
ft
0.0
mph
6.0
ft
6.0
ft
12.0
ft
0.0
mph
o
0.0
mph
60.0
mph
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME
_
Direction olume, V eak-Hour Factor, PHF eak lS-Minute Volume, v15 umber of Lanes 'errain Type
Grade Segment Length 'rucks and Buses 'rucks and Buses PCE, ET ~ecreational Vehicles ~ecreational Vehicles PCE, ER [eavY,Vehicle Adjustment, fHV >river Population Adjustment, fP ;ervice Flow Rate, vp
1 4500 1. 00 1125 3 Level 0.00 0.00 7
1.5
o
1.2 0.97 1. 00 1552
vph
% ml % %
pcphpl
2
5475 1. 00 1370 3 Level 0.00 0.00 7 1.5
o
1.2 0.97 1. 00 1890
vph
% mi % %
pcphpl
_ _ _ _ _ _ _ _ _ _ _ _..:..-
RESULTS
~
_
Direction
1
2
rvice Flow Rate, vp justed Free-Flow Speed, FFS g. Passenger-Car Travel Speed, S vel of Service, LOS nsity, D
1552 60.0 59.0 C. 26.3
pcphpl 1890
mph
60.0
mph
56.9
D
pc/mi/ln 33.2
pcphp l mph mph
pc/mi/ln
HCS: Ramps and Ramp Junctions Release 3.1b -
ne: .a i.L:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _MERGE ANALYS1S,
_
:ation: i Lys t : tlysis Time Period: :e Performed:
1-75 Ramp (Northbound)
2025 AM 4/6/01
_ _ _ _ _ _ _ _ _FREEWAy-RAMP COMPONENTS AND CHARACTER1ST1CS
_
pe of Analysis eeway Data: mber of Lanes in Freeway ee-Flow Speed on Freeway lume on Freeway
Ramp Data: de of Freeway unbe r 0 f Lanes In Ramp :ee-Flow Speed on Ramp i l ume on Ramp mqt h of First Acoe L'Dece I Lane ?ngth of Second Accel/Decel Lane ljacent Ramp Data if one exists: )es adjacent ramp exist? )lume on Adjacent Ramp )sition of Adjacent Ramp fpe of Adjacent Ramp istance to Adjacent Ramp
Merge
3 60.0 4975
Right
1
40.0 675 500
No
mph
vph
mph
vph
ft . ft
vph
ft
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME ADJUSTMENT
_
unction Components
Freeway
Ramp
'errain Type Grade Length
Tolume, V (vph) )eak-Hour Factor, PHF
?eak IS-min Volume, vIS rrucks and Buses rrucks and Buses PCE, ET Kecreational Vehicles Recreational Vehicle PCE, ER Heavy Vehicle Adjustment, fHV Driver Population Adjustment, fp Service Flow Rate, vp
Level
%
mi 4975 1. 00 1244
7 1.5
o
1.2 0.966 1. 00 5151
Level
%
ffil
675 1. 00 169 7 1.5
o
1.2 0.966 1. 00 700
_ _ _ _ _~
and ~,ANALYSIS RESULTS of MERGE AREAS
Adjacent Ramp Level
% mi .
vph
v %
%
pcph
_
Estimation of Flow entering Lanes 1 and 2: Proportion of Freeway Vehicles
Lanes 1 and 2, P = 0.591 Using Equation 2
FM
")w in Lanes 1 and 2, v = v (P ) = 3047 pcph
12 F FM
pacity Checks:
Actual
Maximum
LOS F?
v
5851
6900
No
FO
v
3747
4600
No
R12
vel of Service Operation (if not LOS F) :
nsity, D = 5.475 + 0.00734 v + 0.0078 v
- 0.00627 L
= 31+
R
R
12
A
:vel of Service for Ramp-Freeway Junction Areas of Influence D
.e ed in Ramp Influence Area, S
52.0
R
pc/mi/ln mph
l.anni nq .3.. DOT
HCS: Arterials Release3.1b
hone: -Mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PLANNING ANALYSIS
rterial: irection: ile or Case #: repared By: ate:
State Route 53 2005 with Union Grove Interch 11/30/99
_______________Traffic Characteris tics
nnual Average Daily Traffic, AADT 'lanning Analysis Hour Factor, K lirectional Distribution Factor, D 'e a k Hour Factor, PHF .djusted Saturation Flow Rate 'ercent Turns from Exclusive Lanes
34500 0.100 0.600 0.900 1800 50
vpd
pcphgpl %
______________Roadway Characteris tics
lumber of Through Lanes One Direction, N 'ree Flow Speed, FFS ~rterial Class ;ection Length 1edian .e f t, Turn Bays
2
45 2 1.10 Yes Yes
_ _ _ _ _ _ _ _ _--'-
Signal Characteristics
mph miles
3ignalized Intersections \rrival Type,' AT
3ignal Type (k = 0.5 for Planning)
~ycle Length, C
~ffective Green Ratio, g/C
3
3
Actuated
60.0
sec
0.500
___________________Results
~nnual Average Daily Traffic, AADT rwo-Way Hourly Volume ~ourly Directional Volume rhrough-Volume 15-min. Flow Rate Running Time vic Ratio Through Capacity Progression Factor, PF Uniform Delay Filtering/Metering Factor, I Incremental Delay Control Delay
34500 3450 2070 1150 105.2 0.64 1800 1.000 11. 0 0.726 1.3 12.3
vpd vph vph
v
sec
vph
sec
sec sec/v
_ --...:.._ _
_ _
_
N~rage'Travel Speed, S bterial Lev~l of Service, LOS
27.9
mph
C
-Larm i.nq
;a DOT
HCS: Arterials Release 3.1b
-horie :
:-Mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _PLANNING ANALYSIS
~-----------
vr t.e r i.a L: ri r-ec t i on : ~ile or Case #: Jrepared By: . iat.e :
State Route 53 2025 with Union Grove Interch 11/30/99
________________'I'ra f f ic .Characteristics
_
~nnual Average Daily Traffic, AADT )lanning Analysis Hour Factor, K )irectional Distribution Factor, D )eak Hour Factor, PHF ~djusted Saturation Flow Rate )ercent Turns from Exclusive Lanes
57000 0.100 0.600 0.900 1800 50
vpd
pcphgpl
%
_______________Roadway Characteris tics
_
Jumber of Through Lanes One Direction, N ~ree Flow Speed, FFS vr t e r i.a I Class ;ection Length 1edian ~eft Turn Bays
2 45
2 1.10 Yes Yes
mph miles
_______________Signal Characteris tics
--,-
_
;ignalized Intersections
\rrival Type, AT
;ignal Type (k = 0.5 for Planning)
.:ycle Length, C
~ffective Green Ratio, g/C
3
3
Actuated
60.0
sec
0.500
__________________Resul ts
_
\nnual Average Daily Traffic, AADT rwo-Way Hourly Volume {ourlyDirectional Volume ~hrough-Volume 15-min. Flow Rate cunrii nq Time r/c Ratio rhrough Capacity )rogression Factor, PF Jn i. form Delay ~iltering/Metering Factor, I [ncremental Delay :ontrol Delay
57000 5700 3420 1900 105.2 1. 06 1800 1.000 15.9 0.090 26.6 42.5
vpd vph vph
v
sec
vph
sec
sec sec/v
~~e~ag~ Travel Speed, S ,rterial Level of Service, LOS
17.0
mph
D
Planning Ga DOT
HCS: Multilane Highways Release 3.1b
Phone: E-mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PLANNING ANALYSIS
_
Highway: Analyst: From/To: Analysis Year: Other: Date:
State Route 53
CR 4 (Richardson Rdj to 1-75 2005 With UnionGrove Interchange 11/30/99
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _INPUT DATA,
'--
_
Total AADT Volume, AADT Proportion AADT During Peak Hour, K Percent Peak~Hour Traffic in Heaviest Direction, D
Trucks Terrain Type Ideal Free-Flow Speed, FFSi
38500 0.08 60
5 Level 50.0
vpd
% %
mph '
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ANALYSIS
_
DDHV AADT x D x K DDHV 38500 x 0.60 x 0.08 1848
Volume for : 4-Lane Highway = 1848 6-Lane Highway 1848
vph/2 lanes = 924
vph/3 lanes = 616
LOS vphpl C vphpl B
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _LEVEL OF SERVICE
_
Free-Flow Speed = 60 mph
Free-Flow Speed = 50 mph
Percent Trucks
Terrain
LOS
0
5
10
15
20
Percent Trucks
0
5
10
15
20
Level
A 590 580 570 550 540
B
990 970 940 920 900
C 1360 1330 1290 1260 1240
D 1620 1580 1540 1510 1470
E 1890 1840 1800 1760 1720
490 810 1130 1350 1710
470 790 1110 1320 1670
460 770 1080 1290 1630
450 750 1050 1260 1590
440 740 1030 1230 1550
Rolling
A 590 540 500 460 420
B
990 900 830 760 710
C 1360 1240 1130 1050 970
D 1620 1470 1350 1250 1160
E 1890 1720 1580 1450 1350
490 810 1130 1350 1710
440 740 1030 1230 1550
410 680
950 1130 1430
370 620 870 1040 1320
350 580 810 960 1220
110untian
A 590 480 400 340 300 B 990 790 ' 660 570 500 C 1360 1090 910 780 680 D 1620 1300 1080 930 810 E 1890 1510 1260 1080 950
490 390 320 280 240 810 650 540 460 410
1130 910 760 650 570 1350 1080 900 770 680 1710 1370 1140 980 860
Base Assumptions:
All heavy vehicles are
Lane widths = 12 ft
trucks.
Shoulder width > 6 ft
PHF = 0.90
Access points 20 per mile, each side.
Divided highway
Planning Ga DOT
HCS: Multilane Highways Release 3.1b
Phone: E-mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ PLANNING ANALYSIS
_
Highway: Analyst: From/To: Analysis Year: Other: Date:
State Route 53
CR 4 (Richardson Rd) to 1-75 2025 With UnionGrove Interchange 11/30/99
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ INPUT DATA,
_
Total AADT Volume, AADT
64500
vpd
Proportion AADT'During Peak Hour, K
0.08
Percent Peak-Hour Traffic in Heaviest Direction, D 60
%
Trucks
5
%
Terrain Type
Level
Ideal Free-Flow Speed, FFSi
50.0
mph
_ _ _ _ _ _ _ _ _ _ _- - - - - - - A N A L Y S I S , - - - - - - - - - - - - - - - - _
DDHV = AADT x D x K DDHV = 64500 x 0.60 x 0.08 3096
Volume for : 4-Lane Highway 6-Lane Highway
3096 3096
vph/2 lanes = 1548 vph/3 lanes =,1032
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _LEVEL OF SERVICE,
Free-Flow Speed = 60 mph
LOS vphpl E vphpl C
'---
_
= Free-Flow Speed 50 mph
Percent Trucks
Terrain LOS
0
5
10
15
20
Percent Trucks
0
5
10
15
20
Level
A 590 580 570 550 540 B 990 970 940 920 900 C 1360 1330 1290 1260 1240 D 1620 1580 1540 1510 1470 E 1890 1840 1800 1760 1720
490 810 1130 1350 1710
470 790 1110 1320 1670
460 770 1080 1290 1630
450 750 1050 1260 1590
440 740 1030 1230 1550
Rolling
A 590 540 500 460 420 B 990 900 830 760 710
C 1360 1240 1130 1050 970 D 1620 1470 1350, 1250 1160 E 1890 1720 1580 1450 1350
490 810 1130 1350 1710
440 740 1030 1230 1550
410 680 950 1130 1430
370 620 870 1040 1320
350 580 810 960 1220
Mountian
A 590 480 400 340 300 B 990 790 660 570 500 C 1360 1090 910 780 680 D 1620 1300 1080 930 810 E 1890 1510 1260 1080 950
490 390 320 280 240 810 650 540 460 410 1130 910 760 650 570 1350 1080 900 770 680 1710 1370 1140 980 860
Base Assumptions:
All heavy vehicles are trucks. Lane widths = 12 ft Shoulder width > 6 ft
PHF = 0.90
Access points 20 per mile, each side. Divided highway
Planning Ga DOT
HCS: Multilane Highways Release 3.1b
Phone: E-mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ PLANNING ANALYSIS,
----'-
_
Highway: Analyst: From/To: Analysis Year: Other: Date:
State Route 53
CR 4 (Richardson Rd) to 1-75 2005 Without UnionGrove Interchange 11/30/99
_ _ _ _ _ _ _ _---,-
INPUT DATA
_
Total AADT Volume, AADT
45000
vpd
Proportion AADT During Peak Hour, K
0.08
Percent Peak-Hour Traffic in Heaviest Direction, D 60
%
Trucks
7
%
Terrain Type
Level
Ideal Free-Flow Speed, FFSi
50.0
mph
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~ANALYSIS
_
DDHV AADT x D x K DDHV 45000 x 0.60 x 0.08 2160
Volume for : 4-Lane Highway 6-Lane Highway
2160 2160
vph/2 lanes = 1080
vph/3 lanes = 720
LOS vphpl C vphpl B
_ _ _ _~
_,__-------LEVEL OF SERVICE,
_
Free~Flow Speed = 60 mph
Free-Flow Speed = 50 mph
Percent Trucks
Terrain
LOS
o
5
10
15
20
Percent Trucks
o
5
10
15
20
Level
A
590 580 570 550 540
B 990 970 940 920 900
C 1360 1330 1290 1260 1240
D 1620 1580 1540 1510 1470
E 1890 1840 1800 1760 1720
490 810 1130 1350 1710
470 790 1110 1320 1670
460 770 1080 1290 1630
450 750 1050 1260 1590
440 740 1030 1230 1550
Rolling
A
590 540 500 460 420
B
990 900 830 760 710
C 1360 1240 1130 1050 970
D 1620 1470 1350 1250 1160
E 1890 1720 1580 1450 1350
490 810 1130 1350 1710
440 740 1030 1230 1550
410 680 950 1130 1430
370 620 870 1040 1320
350 580 810 960 1220
Mountian
A
590 480 400 340 300
B
990 790 660 570 500
C 1360 1090 910 780 680
D 1620 1300 1080 930 810
E 1890 1510 1260 1080 950
490 390 320 280 240 810 650 540 460 410 1130 910 760 650 570 1350 1080 900 770 680
1710 1370 1140 980 860
Base Assumptions:
All heavy vehicles are trucks.
Lane widths = 12 ft
Shoulder width > 6 ft
PHF = 0.90 Access points 20 per mile, each side. Divided highway
Planning Ga DOT
HCS: Multilane Highways Release 3.1b
Phone: E-mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PLANNING ANALYSIS
_ _ ~----------
Highway: Analyst: From/To: Analysis Year: Other: Date:
State Route 53
CR 4 (Richardson Rd) to 1-75 2025 Without UnionGrove Interchange 11/30/99
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ INPUT DATA,
_
Total AADT Volume, AADT
76500
vpd
Proportion AADT During Peak Hour, K
0.08
Percent Peak-Hour Traffic in Heaviest Direction, D 60
%
Trucks
7
%
Terrain Type
Level
Ideal F~ee-Flow Speed, FFSi
50.0
mph
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ANALYSIS---'
_
DDHV DDHV
AADT x D x K 76500 x 0.60 x 0.08
3672
Volume for : 4-Lane Highway 6-Lane Highway
3672 3672
vph/2 lanes = 1836
vph/3 lanes = 1224
LOS vphpl F vphpl D
LEVEL OF SERVICE
Free-Flow Speed = 60 mph
Free-Flow Speed = 50 mph
Percent Trucks
Te:-rain LOS
0
5
10
15
20
Percent Trucks
0
5
10
15
20
Level
A 590 580 570 550 540
B
990 970 940 920 900
C i360 1330 1290 1260 1240
D 1620 1580 1540 1510 1470
E 1890 1840 1800 1760 1720
490 810 1130 1350 1710
470 790 1110 1320 1670
460 770 1080 1290 1630
450 750 1050 1260 1590
440 740 1030 1230 1550
Rolling
A 590 540 500 460 420
B
990 900 830 760 710
C 1360 1240 1130 1050 970
D 1620 1470 1350 1250 1160
E 1890 1720 .1580 1450 1350
490 810 1130 1350 1710
440 740 1030 1230 1550
410 680 950 1130 1430
370 620 870 1040 1320
350 580 810 960 1220
Mountian
A 590 480 400 340 . 300
B
990 790 660 570 500
C 1360 1090 910 780 680
D 1620 1300 1080 930 810
E 1890 1510 1260 1080 950
490 390 320 280 240 810 650 540 460 410 1130 910 760 650 570 1350 1080 900 770 680 1710 1370 1140 980 860
Base Assumptions: All heavy vehicles are trucks.
Lane widths = 12 ft
Shoulder width > 6, ft
PHF = 0.90 .
Access points 20 per mile, each side. Divided highway
Planning Ga DOT
HCS: Multilane Highways Release 3.1b
Phone: E-mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PLANNING ANALYSIS
~-------------
Highway: Analyst: From/To: Analysis Year: Other: Date:
State Route 53
1-75 to Bellwood Rd (CR 474) 2005 Without UnionGrove Interchange 11/30/99
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _INPUT DATA.
_
Total AADT Volume, AADT
30500
vpd
Proportion AADT During Peak Hour, K
0.08
Percent Peak-Hour Traffic in Heaviest Direction, D 60
%
Trucks
7
%
Terrain Type
Level
Ideal Free-Flow Speed, FFSi
50.0
mph
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ANALYSIS,
~
_
DDHV = AADT x D x K
DDHV = 30500 x 0.60 x 0.08
1464
Volume for : 4-Lane Highway 6-Lane Highway
1464 1464
= vph/2 lanes = 732
vph/3 lanes 488
LOS vphpl B vphpl B
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _LEVEL OF SERVICE,
_
Free-Flow Speed = 60 mph
Free-Flow Speed = 50 mph
Percent Trucks
Terrain LOS
o
5
10
15
20
Percent Trucks
o
5
10
15
20
Level
A
590 580 570 550 540
B
990 970 940 920 900
C 1360 1330 1290 1260 1240
D 1620 1580 1540 1510 1470
E 1890 1840 1800 1760 1720
490 810 1130 1350 1710
470 790 1110 1320 1670
460 770 1080 1290 1630
450 750 1050 1260 1590
440 740 1030 1230 1550
Rolling
A
590 540 506 460 420
B 990 900 830 760 710
C 1360 1240 1130 1050 970
D 1620 1470 1350 1250 1160
E 1890 1720 1580 1450 1350
490 810 1130 1350 1710
440 740 1030 1230 1550
410 680 950 1130 1430
370 620 870 1040 1320
350 580 810 960 1220
Mountian
A
590 480 400 340 300
B
990 790 660 570 500
C 1360 1090 910 780 680
D 1620 1300 1080 930 810
E 1890 1510 1260 1080 950
490 390 320 280 240 810 650 540 460 410 1130 910 760 650 570 1350 1080 900 770 680 1710 1370 1140 980 860
Base Assumptions: All heavy vehicles ar~ trucks.
Lane widths = 12 ft
Shoulder width > 6 ft
PHF = 0.90
Access points 20 per mile, each side. Divided highway
'.
Planning Ga DOT
HCS: Multilane Highways Release 3.1b
Phone: E-mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PLANNING ANALYSIS
_
Highway: Analyst: From/To: Analysis Year: Other: Date:
State Route 53
1-75 to Bellwood Rd (CR 474) 2005 Without UnionGrove Interchange 11/30/99
_ _ _ _ _ _ _ _ _ _ _ _' -
INPUT DATA.
_
Total AADT Volume, AADT Proportion AADT During Peak Hour, K Percent Peak-Hour Traffic in Heaviest Direction, D Trucks Terrain Type Ideal Free-Flow Speed, FFSi
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ANALYSIS,
30500 0.08 60
7
Level 50.0
vpd
% %
mph _
DDHV AADT x D x K
DDHV 30500 x 0.60 x 0.08 = 1464
Volume for : 4-Lane Highway 6-Lane Highway
1464 1464
vph/2 lanes = 732 vph/3 lanes = 488
LOS vphpl B vphpl B
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _LEVEL OF SERVICE,
---,-
Free-Flow Speed = 60 mph
Free-Flow Speed = 50 mph
Percent Trucks
Terrain LOS
0
5
10
15
20
Percent Trucks
0
5
10
15
20
Level
A 590 580 570 550 540 B 990 970 940 920 900 C 1360 1330 1290 1260 1240 D 1620 1580 1540 1510 1470 E 1890 1840 1800 1760 1720
490 810 1130 1350 1710
470 790 1110 1320 1670
460 770 1080 1290 1630
450 750 1050 1260 1590
440 740 1030 1230 1550
Rolling
A 590 540 500 460 420 B 990 900 830 760 710 C 1360 1240 1130 1050 970 D 1620 1470 1350 1250 1160 E 1890 1720 1580 1450 1350
490 810 1130 1350 1710
440 740 1030 1230 1550
410 680 950 1130 1430
370 620 870 1040 1320
350 580 810 960 1220
Mountian
A 590 480 400 340 300 B 990 790 660 570 500 C 1360 1090 910 780 680 D 1620 1300 1080 930 810 E 1890 1510 1260 1080 950
490 390 320 280 240 810 650 540 460 410 1130 910 760 650 570 1350 1080 900 770 680
1710 1370 1140 980 860
Base Assumptions:
All heavy vehicles are trucks. Lane widths = 12 ft Shoulder width > 6 ft
PHF = 0.90
Access points 20 per mile, each side. Divided highway
"
Planning
Ga DOT
HCS: Multilane Highways Release 3.1b
Phone: E-mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PLANNING ANALYSIS
_
Highway: Analyst: From/To: Analysis Year: Other: Date:
State Route 53
1-75 to Bellwood Rd (CR 474) 2005 With UnionGrove Interchange 11/30/99
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ INPUT DATA,
---,-
_
Total AADT Volume, AADT
26000
vpd
Proportion AADT During Peak Hour, K
0.08
Percent Peak-Hour Traffic in Heaviest Direction, 0 60
%
Trucks
5
%
Terrain Type
Level
Ideal Free-Flow Speed, FFSi
50.0
mph
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~ANALYSIS,
_
DDHV AADT x 0
xK
DDHV 26000 x 0.60 x 0.08 1248
Volume for : 4-Lane Highway 6-Lane Highway
i248 1248
vph/2 lanes = 624 vph/3 lanes = 416
LOS vphpl B vphpl A'
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _LEVEL OF SERVICE,
_
Free-Flow Speed = 60 mph
Free-Flow Speed = 50 mph
Percent Trucks
Terrain LOS
0
5
10
15
20
Percent Trucks
0
5
10
15
20
Level
A 590 580 570 550 540 B 990 970 940 920 900 C 1360 1330 1290 1260 1240 0 1620 1580 1540 1510 1470 E 1890 1840 1800 1760 1720
490 810 1130 1350 1710
470 790 1110 1320 1670
460 770 1080 1290 1630
450 750 1050 1260 1590
440 740 1030 1230 1550
Rolling
A 590 540 500 460 420 B 990 900 830 760 710 C 1360 1240 1130 1050 970
0 1620 1470 1350 1250 1160 E 1890 1720 1580 1450 1350
490 810 1130 1350 1710
440 740 1030 1230 1550
410 680 950 1130 1430
370 620 870 1040 1320
350 580 810 960 1220
Mountian
A 590 480 400 340 300 B 990 790 660 570 500 C 1360 1090 910 780 680
0 1620 1300 1080 930 810 E 1890 1510 1260 1080 950
490 390 320 280 240 810 650 540 460 410 1130 910 760 650 570 1350 1080 900 770 680 1710 1370 1140 980 860
Base Assumptions:
All heavy vehicles are trucks. Lane widths = 12 ft Shoulder width > 6 ft
PHF = 0.90
Access points 20 per mile, ,each side. Divided highway
,Planning Ga DOT
HCS: Multilane Highways Release 3.1b
Phone: .E-mail:
Fax:
_ _ _ _ _ _ _ _ _ _~
PLANNING ANALYSIS
_
Highway: Analyst: . From/To: Analysis Year: Other: Date:
State Route 53
1-75 to Bellwood Rd (CR 474) 2025 With UnionGrove Interchange 11/30/99
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ INPUT OATA,
_
Total AAOT Volume, AADT Proportion AADT During Peak Hour, K Percent Peak-Hour Traffic in Heaviest Direction, 0 Trucks Terrain Type Ideal Free-Flow Speed, FFSi
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ANALYSIS
43500 0.08 60
5
Level 50.0
vpd
% %
mph
~_
DOHV AADT x 0
xK
DOHV 43500 x 0.60 x 0.08
2088
Volume for : 4-Lane Highway 6-Lane Highway
2088 2088
vph/2 lanes 1044 vph/3 lanes 696
LOS vphpl C vphpl B
LEVEL OF SERVICE
Free-Flow Speed = 60 mph
Free-Flow Speed = 50 mph
Percent Trucks
Terrain LOS
0
5
10
15
20
Percent Trucks
0
5
10
15
20
Level
A 590 580 570 550 540 B 990 970 940 920 900 C 1360 1330 1290 1260 1240 0 1620 1580 1540 1510 1470 E 1890 1840 1800 1760 1720
490 810 1130 1350 1710
470 790 1110 1320 1670
460 770 1080 1290 1630
450 750 1050 1260 1590
440 740 1030 1230 1550
Rolling
A 590 540 500 460. 420 B 990 900 830 760 710 C 1360 1240 1130 1050 970 0 1620 1470 1350 125.0 1160 E 1890 1720 1580 1450 1350
490 810 1130 1350 1710
440 740 1030 1230 1550
410 680 950 1130 1430
370 620 870 1040 1320
350 580 810 960 1220
Mountian
A 590 480 400 340 300 B 990 790 660 570 500 C 1360 1090 910 780 680 0 1620 1300 1080 930 810
E 1890 1510 1260 1080 950
490 390 320 280 240 810 650 540 460 410 1130 910 760 650 570 1350 1080 900 770 680 1710 1370 1140 980 860
Base Assumptions:
All heavy vehicles are
Lane widths = 12 ft
trucks.
Shoulder width > 6 ft
PHF = 0.90
Access points 20 per mile, each side. Divided highway
I,
HCS: Ramps and Ramp Junctions Release 3.1b
hone: -mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _MERGE ANALYS1S
'----_
ocation: nalyst: nalysis Time Period: ate Performed:
1-75 Ramp (Northbound)
2025 PM 4/6/01
__________________FREEWAY-RAMP COMPONENTS AND CHARACTER1ST1CS
_
ype of Analysis reeway Data: umber of Lanes in Freeway ree-Flow Speed on Freeway olume on Freeway n Ramp Data: ide of Freeway umber of Lanes in Ramp ree-Flow Speed on Ramp olume on Ramp ength of First Accel/Decel Lane ength of Second Accel/Decel Lane djacent Ramp Data if one exists: oes adjacent ramp exist? olume on Adjacent Ramp osition of Adjacent Ramp ype of Adjacent Ramp istance to Adjacent Ramp
Merge
3
60.0
mph
3875
vph
Right
1
40.0
mph
625
vph
500
ft
ft
No vph
ft
________________________________VOLUME ADJUSTMENT
_
unction Components
Freeway
Ramp
errain Type
Grade Length olume, V (vph) eak-Hour Factor, PHF eak 15-min Volume, v15 rucks and Buses rucks and Buses PCE, ET ecreational Vehicles ecreational Vehicle PCE, ER eavy Vehicle Adjustment, fHV river Population Adjustment, fP ervice Flow Rate, vp
Level
%
mi 3875 1. 00 969
7
1.5
o
1.2 0.96,6 1. 00 4011
Level % mi
625 1. 00 15T 7 1.5
o
1.2 0.966 1. 00 650
__________~-----------ANALYS1S and RESULTS of MERGE AREAS
Adjacent Ramp Level
%
mi vph
v
%
%
pcph
_
stimation of Flow entering Lanes 1 and 2: roportion of Freeway Vehicles
n Lahes 1 and 2, P = 0.591 Using Equation 2
FM lQW in Lanes 1 and 2, v = v (P ) = 2373 pcph
12 F FM
apacity Checks:
Actual
Maximum
LOS F?
v
4661
6900
No
FO
v
3023
4600
No
R12
evel of Service Operation (if not LOS F):
ensity, D = 5.475 + 0.00734 v + 0.0078 v
- 0.00627 L = 26-
R
R
12
A
evel of Service for Ramp-Freeway Ju~ction Areas of Influence C
peed in Ramp Influence Area, S
53.5
R
pc/mi/ln mph
HCS: Ramps and Ramp Junctions Release 3.1b
norie :
-mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _MERGE ANALYS1S
-'--
_
:>cation: nalyst: nalysis Time Period: 3.te Performed:
1-75 Ramp (Southbound)
2025 AM 4/6/01
_ _ _ _ _ _ _ _ _FREEWAY-RAMP COMPONENTS AND CHARACTER1STICS
_
ype of Analysis reeway Data: umber of 'Lanes in Freeway ree-Flow Speed on Freeway olume on Freeway n Ramp Data: ide of Freeway umber of Lanes in Ramp ree-Flow Speed on Ramp olume on Ramp ength of First Accel/Decel Lane ength of Second Accel/Decel Lane .djacent Ramp Data if one exists: oes adjacent ramp exist? olume on Adjacent Ramp osition of Adjacent Ramp ype of Adjacent Ramp .i s t anc e to Adjacent Ramp
Merge
3
60.0
mph
3875
vph
Right
1
40.0
mph
300
vph
500
ft
ft
No vph
ft
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME ADJUSTMENT
_
'unction Components
Freeway
Ramp
'errain Type
Grade Length 'o Lume , V (vph) 'eak-Hour Factor, PHF 'eak 15-min Volume, v15 'rucks and Buses 'rucks and Buses PCE, ET .ecr eet i.onaL Vehicles .e c r e a tional Vehicle PCE, ER teavy Vehicle Adjustment, fHV iri.ve r Population Adjustment, fP :ervice Flow Rate, vp
Level
%
ml 3875 1. 00 969 7 1.5 0 1.2 0.966 1. 00 4012
Level
, 900
mi 300 1:00 75 7 1.5 0 1.2 0.966 1. 00 310
______________ANALYS1S and RESULTS of MERGE AREAS
Adjacent Ramp Level
%
mi vph
v %
%
pcph
~
_
:stimation of Flow entering Lanes 1 and 2: )roportion of Freeway Vehicles
..- Lanes 1 and 2, P =
0.591 Using Equation 2
FM
.qw in Lanes 1 and 2, v = v (P ) = 2373 pcph
12 F FM
rpa c i, ty Checks:
Actual
Maximum
LOS F?
v
4322
6900
No
FO
v
2683
4600
No
R12
.
=vel of Service Operation (if not LOS F) :
=nsity, D = 5.475 + 0.00734 v + 0.0078 v - 0.00627 L = 23+
R
R
12
A
=vel of Service for Ramp-Freeway Junction Areas of Influence
)eed in Ramp Influence Area, S
R
pc/mi/ln mph
HCS: Ramps and Ramp Junctions Release 3.lb
hone: -mail:
Fax:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _M.ERGE ANALYSIS
_
ocation: nalyst: nalysis Time Period: ate Performed:
1.-75 Ramp (Southbound)
2025 PM 4/6/01
__________________FREEWAY-RAMP COMPONENTS AND CHARACTERISTICS
_
ype of Analysis reeway Data: umber of Lanes in Freeway ree-Flow Speed on Freeway olume on Freeway n Ramp Datp.: ide of Freeway umber of Lanes ln Ramp ree-Flow Speed on Ramp olume on Ramp ength of First Accel/Decel Lane ength of Second Accel/Decel Lane djacent Ramp Data if one exists: oes adjacent ramp exist? olume on Adjacent Ramp osition of Adjacent Ramp ype of Adjacent Ramp istance to Adjacent Ramp
Merge
3
60.0
mph
4975
vph
Right
1
40.0
mph
500
vph
500
ft
ft
No vph
ft
-,.-
VOLUME ADJUSTMENT
_
unction Components
Freeway
Ramp
errain Type Grade Length
:>lume, V (vph) eak-Hour Factor, PHF eak l5-min Volume, v15 rucks and Buses rucks and Buses PCE, ET ecreational Vehicles ecreational Vehicle PCE, ER eavy Vehicle Adjustment, fHV river Population Adjustment, fP ervice .Flow Rate n vp
Level
%
mi 4975 1. 00 1244
7
1.5
o
1.2 0.966 1. 00 5150
Level
% mi 500 0.99 126 7 1.5
0 1.2 0.966 1. 00 522
______________ANALYSIS and RESULTS of MERGE AREAS
Adjacent Ramp Level
% mi
vph
v
%
%
pcph _
stimation of Flow entering Lanes 1 and 2: roportion of Freeway Vehicles
'n Lanes 1 and 2, P = 0.591 Using Equation 2
FM
~ow in Lanes 1 and 2, v = v (P ) = 3046 pcph
12 F .FM
apacity Checks:
Actual
Maximum
LOS F?
v
5672
6900
No
FO
v . R12
3568
4600
No
evel of Service Operation (if not LOS F):
ensity, D = 5.475 + 0.00734 v + 0.0078 v - 0.00627 L = 30-
R
R
12
A
evel of Service for Ramp-Freeway Junction Areas of Influence D
peed in Ramp Influence Area, S
52.5
R
pc/mi/ln mph
CROSS STREET ANALYSES
HCS: Signals Release 3.1b
lter: 1-75 Ramp @ UGR
ia Lys t :
i t e : 4/11/01
'w St: Union Grove Road
City/St: Proj #: STP-OOMS(7) Period: 2025AM N/S St: Proposed East Ramp
SIGNALIZED INTERSECTION SUMMARY
). Lanes ;Config
Lume
I Eastbound
IL
T
R
I
I120
I LT
1375 650
. Westbound LTR
021
T
R
700 300
I Northbound
IL T R
I
I101
IL
R
1375
125
me Width 112.0 12.0
12.0 12.0 112.0
12.0
rGR Vol I
0I
0
Southbound
L
T
R
000
rra t i.on
0.25
lase Combination 1
2
5
6
7
8
3 Left Thru Right
P
P
P
NB Left P Thru Right P
Peds
Peds
3 Left Thru'
SB Left
P
Thru
Right
P
P
Right
Peds
Peds
3 Right 3 Right
P
P
EB Right WB Right P
reen
26.0 25.0
30.0
3llow
3.0 3.0
3.0
11 Red
0.0 0.0
0.0
{cle Length: 90.0
secs
____________________Intersection Performance Summary
_
;>pr/ Lane
Adj Sat
Ratios
Lane Group Approach
sn e
Group
Flow Rate
cp
Capcity
( s) .
vic
g/C
Delay LOS Delay LOS
3.stbound 521 2166
1805 3610
0.80 0.289 41. 8 D
0.33 0.600 9.4
A
21.3 C
estbound
1003 1615 orthbound 602
1615 outhbound
3610 1615
1805
1615
0.78 0.278 35.8 D
0.21 1.000 0.3
A
0.69 0.3.33 32.4 C
0.09' 1. 000 0.1
A
25.1 C 24.4 C
Intersection Delay = 23.4 (sec/veh) Intersection LOS = C
HCS: Signals Release 3.1b
)hone:
Fax:
~-Mai 1 : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _OPERAT10NAL ANALYS1S
~
_
:ntersection: :ity/State: .na l.ys t : 'roject No: 'Lrne Period Analyzed: late: ~st/West Street Name: ~rth/South Street Name:
1-75 Ramp @ UGR
STP-OOMS(7) 2025AM. 4/11/01 Union Grove Road Proposed East Ramp
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME DATA
_
I Eastbound
1L
T
R
I
olume
1375 650
HF
10.90 0.90
K 15 Vol 1104 181
i Ln Vol I
Grade
I
0
deal Sat /1900 1900
3.rkExist I
umPark
1
Heavy VehlO
0
I :::> Lanes
1
2
0
3Config I L T
ane Width 112.0 12.0
rOR Vol I
:lj Flow 1417 722
[nSharedLn I
::'op Turns 1
ImPeds
I
.unBus
10
0
Westbound
L
T
R
700 300 0.90 0.90 194 83
0 1900 1900
0
0
021
TR
12.0 12.0
0
778 333
0
0
.0
I . Northbound
IL T R
I
1375
125
10.90
0.90
1104
35
I
I
0
11900
1900
I
I
10
0
I101
IL
R
/12.0
12.0
I
0
1417
139
I
I
I
0
10
0
Southbound -I
L T RI
-------1
I
I
I
I
I
I
I
I
o
o
o
I I
I
1
I I I I
oI
I
rra t i.on
0.25
Area Type: All other areas
_ _ _ _ _ _ _ _ _ _ _ _ _ _OPERATING PARAMETERS
_
I Eastbound
IL T R
I
nit Unmet 10.0 0.0
.rriv. Type I3
3
nit Ext. 13.0 3.0
Factor I
1.000
ost Time 12.0 2.0
xt of g /2.0 2.0
ed Min g I
0.0
Westbound LTR
0.0 0.0
3
3
3.0 3.0
1.000
, 2.0 2.0
2.0 2.0
0.0
I Northbound
IL T R
I
10.0
0.0
13
3
13.0
3.0
I
1. 000
12.0
2.0
12.0
2.0
I
0.0
Southboimd LTR
PHASE DATA
hase Combination 1
2
3
4
5
6
7
8
B Left Thru Right Peds
P
P
P
NB Left P Thru Right P Peds
B Left Thru Right Peds
P
P
P
SB Left Thru Right Peds
B Right
P
P
EB Right
B Right
WB Right P
ceen
~llow
Ll Red
26.0 25.0 3.0 3.0 0.0 0.0
(cle Length: 90.0
secs
30.0 3.0 0.0
Apprl Lane Mvmt Group
Adj Flow Rate
(v)
--Lane Group--
Capacity vic
(c)
Ratio
.s t bound Pri. Sec. Left L Thru T Right
~stbound
Pri. Sec. Left Thru T Right R orthbound Pri. Sec. Left L Thru Right R :outhbound Pri. Sec. Left Thru Right
417
1805
# 0.23
0.289 521
0.80
t
722
3610
0.20
0.600 2166
0.33
778
3610
# 0.22
0.278 1003
0.78
333
1615
0.21
1. 000 1615
0.21
417
1805
# 0.23
0.333 602
0.69
139
1615
0.09
1. 000 1615
0.09
Sum (vis) critical = 0.68
lost Time/Cycle, L = 9.00 sec Critical v/c(X}
= 0.75
pprl Ratios Unf
ane
Del
rp vic g/C dl
LEVEL OF SERVICE WORKSHEET
Prog Lane Increment.a1 Res
Adj Grp Factor Del Del
Fact Cap k
d2
d3
Lane Group Delay LOS
Approach Delay LOS
astbound
0.80 0.289 29.6 1.000 521 0.50 12.2 0.0 41.8 D
0.33 0.600 9.0 1.000 2166 0.50 0.4 0.0 9.4
A
21. 3 C
estbound
0.78 0.278 29.9 1. 000 1003 0.50 5.9 0.0 35.8 D
0.21 1.000 0.0 1. 000 1615 0.50 0.3 0.0 0.3
A
orthbound
0.69 0.333 26.0 1. 000 602 0.50 6.4 0.0 32.4 C
0.09 1.0QO0.0 1. 000 1615 0.50 0.1 0.0 0.1
A
outhbound
25.1 C 24.4 C
Intersection Delay = 23.4 (sec/veh) Intersection LOS = C
_______________________SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts
~
_
APPROACH
EB WB NB SB
ycle Length( C 90.0
sec
.ctual Green Time for Lane.Group, G
:ffective Green Time for Lane Group, g
'pposing Effective Green Time, go
[umber of Lanes in Lane Group, N
lumber of Opposing Lanes, No
.djusted Left-Turn Flow Rate, Vlt
>roportion of Left Turns in Opposing Flow, plto
.djusted Opposing Flow Rate, Vo
,ost Time for Lane Group, tl
,eft Turns per Cycle: LTC=VltC/3600
lpposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
Jpposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
Jf=[Gexp(~ a * (LTC ** b))]-tl, gf<=g
)pposing Queue. Ratio: qro=l-Rpo(go/C)
Jq=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
JU =g-gq if gq>=gf, =g-gf if gq<gf
1=(gq-gf)/2, n>=O
)tho=l-plto
)1*=Plt[1+{(N-1)g/(gf+gu/El1+4.24)) )
si i (Figure 9-7)
~12=(1-Ptho**n)/Plto, E12>=1.0
:min=2(1+Plt)/g or fmin=2(1+Pl)/g
rdiff=max(gq-gf,O)
:m=[gf/g]+[gu/g] [1/{1+Pl(El1-1)}], (min=fmin;max=l.OO)
:It=fm=[gf/g]+gdiff[1/{1+Plt(E12-1) }]
-[gu/g] [1/(1+Plt(El1-1)], (min=fmin;max=l.O) or flt=[fm+0.91(N-l)]/N**
flt
~or special case of single-lane approach opposed by multilane approach, ;ee text.
, If Pl>=l for shared left-turn lanes with N>l, then assume de~facto left-turn lane and redo calculations.
,* For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. 'or special case of multilane approach opposed by single-lane approach lr when gf>gq, see text.
"0
______________________SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts
APPROACH
EB WB NB
:ycle Length, C 90.0
sec
~ctual Green Time for Lane Group, G
~ffective Green Time for Lane Group, g
Jpposing Effective Green Tim~, go
~umber of Lanes in Lane Group, N
~umber of Opposing Lanes, No
~djusted Left-Turn Flow Rate, Vlt
>roportion of Left Turns in Lane Group, Plt
>roportionof Left Turns in Opposing Flow, Plto
~djusted Opposing Flow Rate, Vo
Jost Time for Lane Group, tl
,eft Turns per Cycle: LTC=VltC/3600
lpposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
'pposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
-f=[Gexp(- a * (LTC ** b))]-tl, gf<=g
'pposing Queue Ratio: qro=l-Rpo(go/C)
q=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
u =g-gq if gq>=gf, =g-gf if gq<gf
o=(gq_gf)/2, n>=O
.
tho=l-Plto
1*=Plt[1+{(N-l)g/(gf+gu/Ell+4.24) ))
11 (Figure 9-7)
12=(1-Ptho**n)/Plto, E12>=1.0
min=2(1+Plt)/g or fmin=2{1+Pl)/g
diff=max(gq-gf,O)
l1=[gf/g]+[gu/gJ (1/{l+Pl(El1-1)}], (min=fmin;max=l.OO)
It=fm=[gf/gJ+gdiff[1/{1+Plt(El2-1)}]
[gu/g] [1/ (l+Plt (El1-1)], (min=fmin;max=l. 0) or flt= [fm+O .91 (N-1)] /N**
flt Primary
_ SB
)r special case of single-lane approach opposed by multilane approach, ~e text.
If Pl>=l for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations. , For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. )r special case of multilane approach opposed by single-lane approach : when gf>gq, see text.
. .~.--------------':--_-------~--------
_____________________ SUPPLEMENTAL uNIFORM DELAY WORKSHEET
__
,dj. LT Vol from vol Adjustment Worksheet, v
ric ratio from Capacity Worksheet, X
'rimary phase effe~tive green, ~
:econdary phase effective green, gq
From Supplemental. Permitted LT Worksheet), gu
:ycle length, C 90.0
Red =(C-g-gq-gu), r
.rrivals: v/(3600(max(X,l.0), qa
'rimary ph. departures: s/3600, sp
econdary ph. departures: s(gq+gu)/(gu*3600), ss
.Perm
Pr.ot
Case
ueue at beginning of green arrow, Qa
ueue at beginning of unsaturated green, Qu
esidual queue, Qr
niform Delay, dl
EBLT WBLT' NBLT SBLT
DELAY/LOS WORKSHEET WITH INITIAL QUEUE
ppr/ 3ne coup
Initial Dur. Unmet Unmet Demand Demand Q veh t hrs.
Uniform Delay
Unadj. Adj.
ds
dl sec
Initial Final
Queue Unmet
Paramo Demand
u
Q veh
Initial Lane Queue Group Delay Delay d3 sec d sec
:l.stbound
~stbound
xr t hbourid
-u t hbound
Intersection Delay 23.4 sec/veh
Intersection LOS C
________________ERROR MESSAGES
_
No errors to report.
HCS: Signals Release 3.1b
nter: 1-75 Ramp @ UGR
nalyst: ate: 4/12/01 IW St: Union Grove Road
City/St: Proj #: STP-OOMS(7) Period: 2025PM N/S St: Proposed East Ramps
SIGNALIZED INTERSECTION SUMMARY
o. Lanes
1 Eastbound
IL T R I I120
I Westbound
1L
T
R
I
I021
I Northbound IL T R I I101
GConfig I L T
I
T RIL
R
olume
1425 925
I
575 200 1225
75
ane Width 112.0 12.0
1
12.0 12.0 112.0
12.0
TOR Vol I
I
0
1
0
Southbound LTR
000
uration
0.25
Area Type: All other areas
Signal Operations
hase Combination 1
2
3
4I
5
6
7
8
B Left
P
I NB Left P
Thru
P
P
I
Thru
Right
I
Right P
Peds
I
Peds
B Left
I SB Left
Thru
P
I
Thru
Right
P
P
I
Right
Peds
I
Peds
B Right
P
P
I EB Right
B Right
I WB Right P
reen
26.0 25.0
30.0 25.0
ellow
3.0 3.0
3.0
11 Red
0.0 0.0
0.0 0.0
ycle Length: 115.0 secs
Intersection Performance Summary
pprl Lane
Adj Sat
Ratios
Lane Group Approach
:ine Group
Flow Rate
r-p
Capcity
(s )
vic
g/C
Delay LOS Delay LOS
3.stbound 408 1695
1805 3610
1.16 0.226 139.3 F 0.61 0.470 24.2 C
60.5 E
2stbound
785 1222 Jrthbound 471
1222 Juthbound
3610 1615
1805
1615
0.81 0.217 51. 8 D
0.18 0.757 4.3
A
0.53 0.261 40.7 D
0.07 0.757 3.7
A
39.6 D 31. 5 C
Intersection Delay = 50.2 (sec/veh) Intersection LOS = D
HCS: Signals Release 3.lb
)hone:
Fax:
~-Mail :
_ _ _ _ _ _ _ _ _ _ _ _ _ _OPERAT10NAL ANALYS1S
_
:ntersection: :ity/State: .naLys t : >roject No: 'ime Period Analyzed: late: :ast/West Street Name: ~rth/South Street Name:
1-75 Ramp @ UGR
STP-OOMS(7)
4/12/01 Union Grove Road Proposed East Ramps
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME DATA
_
I Eastbound
I Westbound
I Northbound
Southbound
IL T R IL T R IL T R
LTR
olume
11425
--925
-
-
-
1 I
-
--575
-200
-
11225
-
-
-
-75
-
~-
_
HF
10.90 0.90
I
0.90 0.90 10.90
0.90
K 15 Vol 1118 257
I
160 56 163
21
i Ln Vol I
Grade
I
0
deal Sat 11900 1900
I
I
Io
I
o
I
1900 1900 11900
1900
:trkExist I
I
I
umPark
I
I
I
Heavy Vehl 0
o
I
o o 10
o
J. Lanes I 1 2" 0 1 o 2 I" I 1 o 1
o 0' 0
:;Config I L T
I
T
R IL
R
arie Width 112.0 12.0
I
12.0 12.0 112.0
12.0
rOR Vol I
I"
oI
o
jj Flow 1472 1028
I
639 222 /250
83
[nSharedLn I
I
I
rop Turns I
I
I
ImPeds
I
I
oI
o
o
lffiBus
I0 o
I
o o /0
o
rra t i.on
0.25
Area Type: All other areas
I Eastbound
IL T R
I
nit Unmet 10.0 0.0
rriv. Type I3
3
nit Ext. 13.0 3.0
Factor I
1.000
ost Time 12.0 2.0
xt of g 12.0 2.0
ed Min g 1
0.0
hase Combination 1
2
B Left Thru Right Peds
P
P
P
B Left Thru Right Peds
P
P
P
B Right
P
P
B. Right
OPERATING PARAMETERS
Westbound LTR
0.0 0.0 33 3.0 3.0 1.000 2.0 2.0 2.0 2.0 0.0
I Northbound
IL T R
I
10.0
0.0
13
3
13.0
3.0
I
1. 000
12.0
2.0
12.0
2.0
I
0.0
PHASE DATA
3
4
5
6
NB Left P Thru Right P Peds
SB Left Thru Right Peds
EB Right
WB Right P
Southbound LTR
7
8
reen ellow 11 Red
26.0 25.0 3.0 3.0 0.0 0.0
ycle Length: 115.0 secs
30.0 25.0 3.0 0.0 0.0
Appr/ Lane Mvrnt Group
CAPACITY ANALYSIS WORKSHEET
Adj
Adj Sat Flow
Green
Flow Rate Flow Rate Ratio Ratio
(v)
(s)
(v / s)
(g/C)
--Lane Group--
Capacity vic
(c)
Ratio
stbound Pri. Sec. Left L Thru T Right
is t.bound Pri. Sec. Left Thru T Right R
or t.hbcund Pri. Sec. Left L Thru Right R
outhbound Pri. Sec. Left Thru Right
472 1028
1805 3610
0.26 0.28
0.226 408 0.470 1695.
1.16 0.61
1
639
3610
0.18
0.217 785
0.81
222
1615
0.14
0.757 1222
0.18
250
1805
0.14
0.261 471
0.53
83
1615
0.05
0.757 1222
0.07
Sum (v / s ) critical = 0.00
ost Time/Cycle, L = 0.00 sec Critical v / c (X)
= 0.00
.ppr/ Ratios Unf
.ane
Del
;rp vic g/C d1
LEVEL OF SERVICE WORKSHEET
Prog Lane Incremental Res
Adj Grp Factor Del Del
Fact Cap k
d2
d3
Lane Group Delay LOS
Approach Delay LOS
:astbound
1.16 0.226 44.5 LooO 408 0.50
0.61 0.470 22.6 1. 000 1695 0.50
94.8 0.0 1.6 0.0
139.3 F 24.2 C
60.5 E
lestbound
0.81 0.217 42.8 1. 000 785 0.50 9.1 0.0 51. 8 D 0.18 0.757 4.0 1.000 1222 0.50 0.3 0.0 4.3 A lorthbound
0.53 0.261 36.5 1.000 471 0.50 4.2 0.0 40.7 D
{
0.07 0.757 3.6 1.000 1222 0.50 0.1 0.0 3.7
A
,outhbound
39.6 D 31.5 C
Intersection Delay = 50.2 (sec/veh) Intersection LOS = D
_____________________SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts
APPROACH
EB WB NB
-c I e Length, C 115.0 sec
:tual Green Time for Lane Group, G :fective Green Time~ for Lane Group/ 9
>posing Effective Green Time/ go
Imber of Lanes in Lane Group/ N
Imber of Opposing Lanes/ No
ljusted Left-Turn Flow Rate/ Vlt
:oportion of Left Turns in Opposing Flow/ Plto
ljusted Opposing Flow Rate/ Vo
>st Time for Lane Group/ tl
~ft Turns per Cycle: LTC=VltC/3600
)posing Flow per Lane/ Per Cycle: Volc=VoC/3600fluo
)posing Platoon Ratio/ Rpo (Table 9-2 or Eqn 9-7)
:=[Gexp(- a * (LTC ** b}})-tl/ gf<=g
)posing Queue Ratio: qro=l-Rpo(go/C)
F(4.943Volc**O.762) (qro**1.061)-tL gq<=g
1 =g-gq if gq>=gf/ =g-gf if gq<gf
'=(gq-gf)/2/ n>=O
~ho=l-plto
L*=Plt[1+{(N-i)g/(gf+gu/El1+4.24)) )
L1 (Figure 9-7)
L2=(1-Ptho**n)/Plto/ E12>=1.0
nin=2(1+Plt)/g or fmin=2(1+Pl)/g
jiff=max(gq-gf/O)
n= [gf/g] + [gu/g] [1/ {l+Pl (Ell-I)}] / (min=fmin;max=1.00)
It=fm=[gf/g)+gdiff[1/{1+Plt(E12-1)}]
[gu/g] [1/(1+Plt(Ell-1)]/ (min=fmin;max=1.0) or flt=[fm+0.91(N-1))/N**
flt
_ SB
Jr special case of single-lane approach opposed by multilane approach/ 2e text.
If Pl>=l for shared left-turn lanes with N>l/ then assume de-facto left-turn lane and redo calculations. * For permitted left-turns with multiple ex~lusive left-turn lanes/ flt=fm. 8r special case of multilane approach opposed by single-lane approach r when gf>gq/ see text.
______________________SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts
APPROACH
EB WBNB
~ycle Length, C 115.0 sec
~ctual Green Time for Lane Group, G
~ffective Green Time for Lane Group, 9
)pposing Effective Green Time, go
lumber of Lanes in Lane Group, N
lumber of Opposing Lanes, No
.djusted Left-Turn Flow Rate, Vlt
'roportion of Left Turns in Lane Group, pIt
'roportion of Left Turns in Opposing Flow, Plto
rljusted Opposing Flow Rate, Vo
ost Time for Lane Group, tl
eft Turns per Cycle: LTC=VltC/3600
pposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
pposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
f=[Gexp(- a * (LTC ** b)J-tl, gf<=g
pposing Queue Ratio: qro=l-Rpo(go/C)
q=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
u =g-gq if gq>=gf, =g-gf if gq<gf
=(gq-gf)/2, n>=O
tho=l-Plto
l*=Plt[l+{ (N-1)g/(gf+gu/El1+4.24)
11 (Figure 9-7)
12=(1-Ptho**n)/Plto, E12>=1.0
nin=2(1+Plt)/g or fmin=2(1+Pl)/g
jiff=max(gq-gf,O)
n=[gf/g]+[gu/g] [1/{l+Pl(El1-1)}], (min=fmin;max=1.00)
Lt=fm=[gf/g]+gdiff[1/{1+Plt(E12-1)}]
~ gul g) [l/ ( 1 +pI t (Ell-I) ] , (min= fmin; max=l .0) or fl t= [fm+ 0 . 91 (N- i) ] /N* *
fIt Primary
_ SB
>r special. case of single-lane approach opposed by multilane approach, !e text.
If Pl>=l for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations.
For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. r special case of multilane approach opposed by single-lane approach
when gf>gq, see text.
_____________________SUPPLEMENTAL UNIFORM DELAY WORKSHEET
__
jj. LT Vol from Vol Adjustment Worksheet, v /c ratio from Capacity Worksheet, X rimary phase effective green, g econdary phase effective green, gq From Supplemental Permitted LT Worksheet), gu ycle length, C 115.0 Red =(C-g-gq-gu), r rrivals: v/{3600{max{X,l.0), qa rimary ph. departures: s/3600, sp econdary ph. departures: s{gq+gu)/{gu*3600), ss
.Perm .Prot .Case ueue at beginning of green arrow, Qa ueue at beginning of unsaturated green, Qu .esidual queue, Qr hiform Delay, dl
EBLT WBLT NBLT SBLT
DELAY/LOS WORKSHEET WITH INITIAL QUEUE
ppr/ ane roup
Initial Dur. Unmet Unmet Demand Demand Q veh t hrs.
Uniform Delay
Unadj. Adj.
ds
d1 sec
Initial Final
Queue Unmet
Paramo Demand
u
Q veh
Initial Lane Queue Group Delay Delay d3 sec d sec
astbound
estbound
orthbound
outhbound
Intersection Delay 50.2 sec/veh
Intersection LOS D
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ERROR MESSAGES,_ _~
_
No errors to report.
Inter: 1-75 zmalyst: )at e : 4 I 12 101 E/W St: Union Grove Road
HCS: Signals Release 3.1b
City/St: Proj #: STP-OOMS(7) Period: 2025AM N/S St: Proposed West Ramp
o2
T
825 12.0
o 0 o
o1
R
425 12.0
o
)uration
0.25
Area
)hase Combination 1
2
m Left
Thru
P
Right
P
P
Peds
5
8
Left
Thru
Right
Peds
lB Left
P
Left P
Thru
P
P
Thru
Right
Right P
Peds
Peds
[B Right
Right P
BRight
P
P
Right
reen
11. 0 20.0
20.0
ellow
3. O. 3.0
3.0
11 Red
0.0 0.0
0.0
yele Length: 60.0
sees
___________________Interseetion Performance Summary
__
pprl 'arie rp
Lane Group Capeity
Adj Sat
Ratios
Flow Rate
( s)
vic
g/C
Lane Group . Approach Delay LOS Delay LOS
astbound.
1203 1615 2stbound 331 2046
3610 1615
1805 3610
0.76 0.333 22.5 C
0.15 1.000 0.2
A
0.25 0.183 22.8 C
0.54 0.567 9.2
A
17.7 B 10.1 B
)rthbound
mthbound 602
1805
0.37
1615
1615
0.29
Intersection Delay = 14.1
0.333 16.9 B
5.7
A
1.000 0.5
A
(sec/veh) Intersection LOS = B
'.
HCS: Signals Release 3.1b
-horie .
Fax:
~-Mail :
_--'--
OPERAT10NAL ANALYS1S
_
:ntersection: :ity/State: .nalyst: 'ro j ec t; No: lime Period Analyzed: late: :ast/West Street Name: ~rth/South Street Name:
1-75
STP-OOMS(7) 2025AM 4/12/01 Union Grove Road Proposed West Ramp
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME DATA
_
I Eastbound
I Westbound
Northbound / Southbound I
IL
T
R IL
T
R
L T R IL T R I
1
-----'---1-------
1
1
olume
I
825 225 175 1000
1200
425 I
HF
I
0.90 0.90 10.90 0.90
10.90
0.90 I
K 15 Vol I.
229 63 121 278
156
118 I
i Ln Vol. I
I
I
I
Grade
I
/
0
Io
I
deal Sat 1
/1900 1900
11900
1900 I
arkExist umPark
II
II
1I
II
Heavy Vel1l
o0
10
0
I0
oI
J. Lanes I 3Config I ane Width I rOR Vol I
o2
T
12.0
1
R
12.0
o
I1 2 0
oooI 1
I L TIL
112.0 12.0
I
112.0
I
o1 I
R1
12.0 I oI
:lj Flow I
InSharedLnl
.917 250 183
I
1111
1222
I'
472 I I
rop Turns I
I
1
I
lmPeds
I
1mBUS
I
oI
o0
I0
0
oI I0
oI oI
rra t i.on
0.25
Area Type: All other areas
_ _ _ _ _ _ _ _ _ _ _ _ _ _OPERATING PARAMETERS
_
I Eastbound
IL T R
I
nit Unmet .rriv. Type
II
0.0 0.0
3
3
nit Ext. I
3.0 3.0
Factor I
1.000
ost Time I
2.0 2.0
xt of g I
2.0 2.0
.ed Min g I
0.0
I Westbound
IL T R
I
10.0 0.0
13
3
13.0 3.0
I
1.000
12.0 2.0
12.0 2.0
I
0.0
Northbound
L
T
R
PHASE DATA
I Southbound IL T R I
10.0
0.0
13
3
13.0
3.0
I
1.000
12.0
2.0
12.0
2.0
I
0.0
hase Combination 1
2
3
4
5
6
7
8
B Left Thru Right Peds
P
P
P
NB Left Thru Right Peds
3 Left Thru Right Peds
P
P
P
SB Left P Thru Right P Peds
3 Right
EB Right P
Right
P
P
WB Right
"een ..l Low .1 Red
11.0 20.0 3.0 3.0 0.0 0.0
'c1e Length: 60.0
secs
20.0 3.0 0.0
VOLUME ADJUSTMENT WORKSHEET
sppr . /
Mvt
rovement; Volume PHF
Adjusted
Prop. Prop.
Flow No. Lane
Flow Rate Left Right
Rate Lanes Group RTOR In Lane Grp Turns Turns
~astbound
Left
a
Thru
825
0.90 917
2
T
917
Right 225
0.90 250
1
Ra
250
lestbound
Left 75
0.90 83
1
L
Thru
1000 0.90 1111 2
T
Right
a
83
1111
rorthbound
Left
a
Thru
a
Right
a
outhbound
Left
200
0.90 222
1
L
222
Thru
a
Right 425
0.90 472
1
R
a
472
Value entered by user.
SATURATION FLOW ADJUSTMENT WORKSHEET
ppr/ Ideal
ane Sat f
f
f
f
roup Flow W
HV
G
P
::l.stbound
f
f
f
f
f
BB
A
LU RT
LT
Sec LT Adj/LT Sat:
Adj Sat Flow
1900 1. 000 1. 000 1. 000 1.000 1. 000 1.00 0.95 1.000 1.000 3610
1900 1.000, 1.000 1.000 1.000 1.000 1. 00 1. 00 0.850
1615
~stbound
1900 1900
1. 000 1. 000
1. 000 1. 000
1. 000 1. 000
1.000 1.000
Sec LT Adj/LT Sat: 1. 000 1. 00 1. 00 1.000 1. 00 0.95 1.000
0.950 1.000
1805 3610
)rthbound
Sec LT Adj/L.TSat:
)uthbound
Sec LT Adj/LT Sat:
1900 1.000 1.000 1.000 1.000 1.000 1.00 1.00
0.950
1900 1.000 1.000 1.000 1.000 1.000 1.00 1.00 0.850
1805 1615
Apprl Lane Mvmt Group
Adj Flow Rate
(v)
--Lane Group--
Capacity vic
(c)
Ratio
astbound Pri. Sec. Left Thru T Right R
estbound Pri. Sec. Left L Thru T Right
orthbound Pri. Sec. Left Thru Right
outhbound Pri. Sec. Left L Thru Right R
917 250
83 1111
3610 1615
0.25 0.15
0.333 1203 1. 000 1615
0.76 0.15
1805 3610
0.05 # 0.31
0.183 331 0.567 2046
0.25 0.54
222
1805
# 0.12
0.333 602
0.37
472
1615
0.29
1.000 1615
0.29
ost Time/Cycle, L = 6.00 sec
Sum (vis) critical = 0.43
Critical vic (X)
= 0.48
pprl Ratios Dnf
ane
Del
rp vic g/C d1
LEVEL OF SERVICE WORKSHEET
Prog Lane Incremental Res
Adj Grp Factor Del Del
Fact Cap k
d2
d3
Lane Group Delay LOS
Approach Delay LOS
astbound
0.76 0.333 17.9 1. 000 1203 0.50 4.6 0.0 22.5 C
0.15 1. 000 0.0 1. 000 1615 0.50 0.2 0.0 0.2
A
estbound
0.25 0.183 21.0 1. 000 331 0.50 1.8 0.0 22.8 C
0.54 0.567 8.1 1. 000 2046 0.50 1.0 0.0 9.2
A
17.7 B 10.1 B
orthbound
outhbound
0.37 0.333 15.2 1.000 602 0.50 1.7 0.0 16.9 B
5.7
A
0.29 1.000 0.0 1.000 1615 0.50 0.5 0.0 0.5
A
Intersection Delay = 14.1 (sec/veh) Intersection LOS = B
_ _ _'-----
SUPPLEMENTAL PERMITTED LT WORKSHEET
~_---,-
_
for exclusive lefts
APPROACH
(cle Length, C 60.0
sec
EB WB NB SB
:tual Green Time for Lane Group, G
Efective Green Time for Lane Group, 9
Jposing Effective Green Time, go
1mber of Lanes in Lane Group, N
1mber of Opposing Lanes, No
jjusted Left-Turn Flow Rate, Vlt
roportion of Left Turns in Opposing Flow, Plto
jjusted Opposing Flow Rate, Vo
Jst Time for Lane Group, tl
3ft Turns per Cycle: LTC=VltC/3600
~posinq Flow per Lane, Per Cycle: Volc=VoC/3600fluo
~posing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
E=[Gexp(- a * (LTC ** .b))]-tl, gf<=g
~posing Queue Ratio: qro=l-Rpo(go/C)
~=(4.943Volc**0.762)(qro**1.061)-tl, gq<=g
1 =g-gq if gq>=gf, =g-gf if gq<gf
=(gq-gf)/2, n>=O
cho=l-Plto
l*=Plt[1+{(N-1)g/(gf+gu/El1+4.24)))
II (Figure 9-7)
l2=(1-Ptho**n)/Plto, E12>=1.0
nin=2(1+Plt)/g or fmin=2(1+Pl)/g
jiff=max(gq-gf,O)
. n=[gf/g]+[gu/g] [l/{1+Pl(El1-1)}], (min=fmin;max=1.00)
It=fm=[gf/g]+gdiff[1/{1+Plt(E12-1)}]
[gu/g] [1/ (l+Plt (El1-1)], (min=fmin;max=l. 0) or flt= [fm+O. 91 (N-1)] /N**
fIt
Jr special case of single-lane approach opposed by multilane approach, 3e text.
If Pl>=lfor shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations.
k For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. )r special case of multilane approach opposed by single-lane approach c when gf>gq, see text.
_______________________SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts
~----
APPROACH
EB WB NB
'ycle Length, C 60.0
sec
.ctual Green Time for Lane Group, G
:ffective Green Time for Lane Group, 9
'pposing Effective Green Time, go
'umber of Lanes in Lane Group, N
'umber of Opposing Lanes, No
.djusted Left-Turn Flow Rate, Vlt
'roportion of .Left Turns in Lane Group, PIt
'roportion of Left Turns in Opposing Flow, plto djusted Opposing Fl~w Rate, Vo
~s~ Time for Lane Group, tl
,eft Turns per Cycle: LTC=VltC/3600
pposing Flow per Lane; Per Cycle: Volc=VoC/3600fluo
pposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
f=[Gexp(- a * (LTC ** b))]-tl, gf<=g
pposing Queue Ratio: qro=l-Rpo(go/C)
q=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
u =g-gq if gq>=gf, =g-gf if gq<gf
.=(gq-gf)/2, n>=O
tho=l-Plto
1*=Plt[1+{(N-1)g/(gf+gu/El1+4.24) ))
11 (Figure 9-7)
l2=(1-Ptho**n)/Plto, E12>=1.0
min=2(1+Plt)/g or fmin=2(1+Pl)/g
diff=max(gq-gf,O)
m=[gf/g]+[gu/g] [1/{1+Pl(El1-1)}], (min=fmin;max=1.00)
It=fm=[gflg]+gdiff[11{1+Plt(E12-1)}]
[gu/g] [II (l+Plt (Ell-I) J, (min=fmin;max=l. 0) or flt= [fm+O. 91 (N-1)] IN**
fIt Primary
.
__ SB
or special case of single-lane approach opposed by multilane approach,' ee text.
If Pl>=l for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations. * For permitted left-turns with multiple 'exclusive left-turn lanes, flt=fm. or special case of multilane approach opposed by single-lane approach r when gf>gq, see text.
______________________SUPPLEMENTAL UNIFORM DELAY WORKSHEET
__
Adj. LT Vol from Vol Adjustment Worksheet, v
vic ratio from Capacity Worksheet, X
Primary phase effective green, g
Secondary phase effective green, gq
(From Supplemental Permitted LT Worksheet)~ gu
Cycle length, C60.0
Red =(C-g-gq-gu), r
Arrivals: v/(3600(max(X,l.0), qa
Primary ph~ departures: s/3600, sp
Secondary ph. departures: s(gq~gu)/(gu*3600), ss
XPerrn
XProt
XCase
Queue at beginning of green arrow, Qa
Queue at beginning of unsaturated green, Qu
Residual queue, Qr
Jniform Delay, dl
EBLT WBLT NBLT SBLT
DELAY/LOS WORKSHEET WITH INITIAL QUEUE
\ppr/
Jane ;roup
Initial Dur. Unmet Unmet Demand Demand Q veh t hrs.
Uniform Delay
Unadj. Adj.
ds
dl sec
Initial Final
Queue Unmet
Paramo Demand
u
Q veh
Initial Lane Queue Group Delay Delay d3 sec d sec
.a s t bourid
'e s t bourid
Jrthbound
ru t.hbourid
Intersection Delay 14.1 sec/veh
Intersection LOS B
'.
_________________ERROR MESSAGES
_
No errors to report.
HCS: Signals Release 3.1b
nter: 1-75 nalyst: ate: 4/12/01/W St: Union Grove Road
City/St: Proj #: STP-OOMS(7) Period: 2025PM N/S St: Proposed West Ramp.
_ _ _ _ _--,-
SIGNALIZED INTERSECTION SUMMARY_----;-
-----,---
Eastbound
I Westbound
I Northbound I Southbound
L
T R IL T
R IL r
R IL T R
o. Lanes GConfig olume
-
-
0
-
-
2
-
-
1
1I
120
T
R I LT
1050 375 1125 675
1 I
-----
000
-
1 I
1
-
-o
-
-
1
-
I
IL
R
I
1300
375
ane Width TOR Vol
12.0 12.0 112.0 12.0
1
oI
I
112.0
I
12.0
o
uration 0.25
Area
hase Combination 1
2
5
6
7
8
B Left
Left
Thru
P
Thru
Right
P
P
Right
Peds
Peds
B Left
P
Left P
Thru Right
P
P
Thru Right P
Peds
Peds
BRight
Right P
BRight
P
P
Right
reen
11. 0 20.0
20.0
ellow
3.0 3.0
3.0
11 Red
0.0 0.0
0.0
ycle Length: 60.0
secs
__________--:-
Intersection Performance Summary
~
_
ppr/ Lane
Adj Sat
Ratios
Lane Group Approach
ane Group
Flow Rate
rp
Capcity
( s)
vic g/C
Delay LOS Delay LOS
astbound
1203 1615 estbound. 331 2046
3610 1615
1805 3610
0.97 0.333 39.4 D
0.26 1.000 0.4
A
0.420.183 25.6 C
0.37 0.567 7.6
A
29.1 C 10.4 B
orthbound
outhbound 602
1805
0.55
1615
1615
0.26
Intersection Delay = 22.1
0.333 20.0- B
9.1 A
1.000 0.4
A
(sec/veh) Intersection LOS = C
HCS: Signals Release 3.1b
?hone:
Fax:
~-Mail : _ _ _ _ _ _ _ _ _ _ _ _ _ _OPERAT10NAL ANALYS1S
Cntersection:
~ity/State:
xnal ys t : )roj ect No: ~ime Period Analyzed: iat.e : ~ast/West Street Name: Jorth/South Street Name:
1-75
STP-OOMS(7) 2025PM 4/12/01 Union Grove Road Proposed West Ramp
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME DATA,
'--
I Eastbound
IL T R
I
'o Lurne
I
1050 375
'HF
I
0.90 0.90
'K 15 Vol I
292 104
:i Ln Vol 1
Grade
I
0
deal Sat I
1900 1900
arkExist I
umPark
I
Heavy Vehl
0
0
o. Lanes I 0 2 1
GConfig I
T
R
ane Width I
12.0 12.0
TOR Vol I
0
dj Flow I
1167 417
1nSharedLn/
rop Turns I
urnPeds
I
0
umBus
I
0
0
I Westbound
IL
T
R
I
1125 675
10.90 0.90
135 188
I
1
0
11900 1900
I
I
10
0
I120
I LT
112.0 12.0
I
1139 750
I
/
I
10
0
Northbound
L
T
R
000 0
uration
0.25
Area Type: All other areas
_
_
I Southbound
IL T R
I
1300
375
10.90
0.90
183
I
I
0
11900
104 1900
1
I
10.
I1 IL
/12.0
I
1333
I I I
/0
0 01
R
12.0 0 417
0 0
OPERATING PARAMETERS
I Eastbound
IL T R
I
ni .rr
t Unmet iv. Type
II
0.0 0.0
3
3
nit Ext. I
3.0 3.0
Factor I
1. 000
ostTime I
2.0 2.0
xt of g I
2.0 2.0
ed Min g I
0.0
I Westbound
IL T R
I
10.0 0.0
13
3
13.0 3.0
I
1.000
12.0 2.0
12.0 2.0
I
0.0
Northbound
L
T
R
I Southbound
IL T R
1
_
10.0
13 13.0
I
12.0
12.0
I
0.0
3 3.0 1.000 2.0 2.0 0.0
PHASE DATA
hase Combination 1
2
3
4i
5
6
7
8
B Left Thru Right Peds
P
P
P
I NB I I I
Left Thru Right Peds
B Left Thru Right Peds
P
P
:p
I SB Left P
I
Thru
I
Right P
I
Peds
B Right
B Right
reen e110w 11 Red
P
P
11. 0 20.0 3.0 3.0 0.0 0.0
I EB I I WB I I
Right P Right
20.0 3.0 0.0
yc1e Length: 60.0
secs
VOLUME ADJUSTMENT WORKSHEET
I.ppr. /
Mvt
10vement Volume PHF
Adjusted Prop. Prop.
Flow No. Lane
Flow Rate Left Right
Rate Lanes Group RTOR In Lane Grp Turns Turns
~astbound
Left
0
Thru
1050 0.90 1167 2
T
Right 375
0.90 417
1 R0
1167 417
7estbound
Left
125
0.90 139
1
L
139
Thru
675 0.90 750
2
T
750
Right
0
r6rthbound
Left
a
Thru
a
Right
a
outhbound
Left
300
0.90 333
1
L
333
Thru
a
Right 375
0.90 417
1
R0
417
Value entered by user.
SATURATION FLOW ADJUSTMENT WORKSHEET
ppr/ Ideal
Adj
ane Sat f
f
f
f
f
f
f
f
f
Sat
roup Flow W
HV
G
P
BB
A
LU RT
LT
Flow
astbound
Sec LT Adj/LT Sat:
1900 1.000 1. 000 1.000 1.000 1. 000 1. 00 0.95 1. 000 1.000 1900 1. 000 1.000 1.000 1.000 1. 000 1. 00 1. 00 0.850
3610 1615
2stbound
Sec LT Adj/LT Sat:
1900 1. 000 1.000 1.000 1. 000 1.000 1. 00 1. 00
0.950
1900 1. 000 1. 000 1.000 1.000 1. 000 1.00 0.95 1. 000 1.000
1805 3610
)rthbound
Sec LT Adj/LT Sat:
)uthbound
Sec LT Adj/LT Sat:
1900 1.000 1.000 1.000 1.000 1.000 1.00 1.00
0.950
1900 1.000 1.000 1.000 1.000 1.000 1.00 1.00 0.850
1805 1615
Appr/ Lane Mvmt Group
Adj Flow Rate
(v)
--Lane Group-~
Capacity vic
(c)
Ratio
:astbound Pri. Sec. Left Thru T Right R
restbound Pri. Sec. Left L Thru T Right
'o r t.hbound
Pri. Sec. Left Thru Right outhbound Pri. Sec. Left L Thru Right R
1167 417
139 750
3610 1615
# 0.32 0.26
0.333 1203 1. 000 1615
0.97 0.26
1805 3610
# 0.08 0.21
0.183 331 0.567 2046
0.42 0.37
333
1805
# 0.18
0.333 602
0.55
417
1615
0.26
1.000 1615
0.26
Sum (v/s) critical = 0.58
o st; Time/Cycle, L = 9.00 sec Critical v/c(X)
= 0.69
ppr/ Ratios Dnf
ane
Del
rp vic g/C d1
LEVEL OF SERVICE WORKSHEET
Prog Lane Incremental Res
Adj Grp Factor Del Del
Fact Cap k
d2
d3
Lane Group Delay LOS
Approach Delay LOS
3stbound
0.97 0.333 19.7 1.000 1203 0.50 19.7 0.0 39.4 D
0.26 1. 000 0.0 1. 000 1615 0.50 0.4 0.0 0.4
A
2stbound
0.42 0.183 21.7 1.000 331 0.50 3.9 0.0 25.6 C
0.37 0.567 7.1 1.000 2046 0.50 0.5 0.0 7.6 A
29.1 C 10.4 B
Jrthbound
Juthbound
0.55 0.333 16.3 1.000 602 0.50 3.6 0.0 20.0- B
9.1 A
0.26 1.000 0.0 1.000 1615 0.50 0.4 0.0 0.4
A
Intersection Delay = 22.1 (sec/veh) Intersection LOS = C
.
_______________________SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts
APPROACH
EB
WB
NB
~ycle Length, C 60.0
sec
\ctual Green Time for Lane Group, G
~ffective Green Time for Lane Group, g
)pposing Effective Green Time, go
Jumber of Lanes in Lane Group, N
Jumber of Opposing Lanes, No
~djusted Left-Turn Flow Rate, Vlt
>roportion of Left Turns in Opposing Flow, Plto
~djusted Opposing Flow Rate, Vo
Jost Time for Lane Group, tl
,eft Turns per Cycle: LTC=VltC/3600
lpposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
lpposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
rf= [Gexp(- a * (LTC ** b)) ].-tl, gf<=g
lpposing Queue Ratio: qro=l-Rpo(go/C)
rq=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
iU =g-gq if gq>=gf, =g-gf if gq<gf
:=(gq-gf)/2, n>=O
'tho=l-plto
'I * =PIt [ 1 + { (N- 1 ) g I (g f +gu I E11 +4 . 2 4) ) )
:11 (Figure 9-7)
:12=(1-Ptho**n)/Plto, E12>=1.0
min=2(1+Plt)/g or fmin=2(1+Pl)/g
diff=max(gq-gf,O)
m=[gf/g]+[gu/g] [1/{1+Pl(El1-1)}], (min=fmin;max=1.00)
It=fm=[gf/g]+gdiff[1/{1+Plt(E12-1)}]
[gu/g] [11 (l+Plt (Ell-I)], (min=fmin;max=l. 0) or flt= [fm+O. 91 (N-1)] IN**
fIt
_ SB
or special case of single-lane approach opposed by multilane approach, ee text.
If pI>=l for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations. * For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. 8r special case of multilane approach opposed by single-lane approach r when gf>gq, see text.
_______________________SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts
APPROACH
EB WB NB
~ycle Length, C 60.0
sec
~ctual Green Time for Lane Group, G
~ffective Green Time for Lane Group, g
Jpposing Effective Green Time, go
lumber of Lanes in Lane Group, N
lumber of Opposing Lanes, No
.djusted Left-Turn Flow Rate, Vlt
>roportion of Left Turns in Lane Group, pIt
>roportion of Left Turns in Opposing Flow, Plto
rljusted Opposing Flow Rate, VO
lost Time for Lane Group, tl
,eft Turns per Cycle: LTC=VltC/3600
'pposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
-ppos i nq Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
f=[Gexp(- a * (LTC ** b))]-tl, gf<=g
pposing Queue Ratio: qro=l-Rpo(go/C)
q=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
u =g-gq if gq>=gf, =g-gf if gq<gf
=(gq-gf)/2, n>=O
tho=I-Plto
1*=Plt[I+{(N-l)g/(gf+gu/Ell+4.24)) )
11 (Figure 9-7)
l2=(1-Ptho**n)/Plto, E12>=1.0
min~2(1+Plt)/g or fmin=2(1+PI)/g
diff=max(gq-gf,O)
m= [gf Ig] + (gu/g] [11 {l+Pl (Ell-I) } ], (min=fmin; max=l. 00)
It=fm=[gf/g]+gdiff(l/{1+Plt(E12-1)}]
[gu/g] (l/(I+Plt(Ell-l)], (min=fmin;max=I.0) or flt=(fm+0.91(N-l)]/N**
fIt Primary
__ SB
Jr special case of single-lane approach opposed by multilane approach, 2e text.
If Pl>=1 for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations. k For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. )r special case of multilane approach opposed by single-lane approach c when gf>gq, see text.
-.... - - - - - - - - - - - - - - - - - - - ' - - - - - - - - - - - - - - - - - - - - - - - - - -
_____________________SUPPLEMENTAL UNIFORM DELAY WORKSHEET
__
.dj. LT Vol from Vol Adjustment Worksheet, v
'/c ratio from Capacity Worksheet, X
'rimary phase effective green, g
:econdary phase effective green, gq
From Supplemental Permitted LT Worksheet), gu
:ycle length, C 60.0
Red =(C-g-gq-gu), r
.rr i val s: V / ( 3 6 0 0 (max (X, 1. 0) ) ), q a
'rimary ph. departures: s/3600, sp
econdary ph. departures: s(gq+gu)/(gu*3600), ss
.Perm
.Prot
Case
ueue ~t beginning of green arrow, Qa
ueue at beginning of unsaturated green, Qu
esidual queue, Qr
niform Delay, dl
~BLT WBLT NBLT SBLT
DELAY/LOS WORKSHEET WITH INITIAL QUEUE
ppr/ ane roup
Initial Dur. Unmet Unmet Demand Demand Q veh t hrs.
Uniform Delay
Unadj. Adj.
ds
d1 sec
Initial Final
Queue Unrnet
Paramo Demand
u
Q veh
Initial Lane Queue Group Delay Delay d3 sec d sec
astbound
~stbound
xr t.hbourid
mthbound
Intersection Delay 22.1 sec/veh
Intersection LOS C
________________ERROR MESSAGES
_
No errors to report.
.
HCS: Signals Release 3.1b
:nter: Marine Road @ UGR sna Lys t : ia t e : 4/-13/01 ~/W St: Union Grove Road
City/St: Proj #: STP-OOMS(7)
Period: 2 o2'5AM
N/S St: Marine Rd./Mohawk Ind.
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
1 Westbound
I Northbound, 1 Southbound I
IL T R IL T R IL T R IL T R I
I
I
I
I
I
10. Lanes I 1 2 1 I 1 2 1 I 1 1 1 I 1 1 1 I
JGConfig' I L T R I L T R I L T R I L T R I
'ol ume
1375 675 100 1200 725 500 150 75 75 1300 25 225 I
.arie Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 i2.0 I
~TOR Vol
I
60 I
100 I
20 I
225 I
rura t i.on
0.25
Area Type: All other areas
Signal Operations
'hase Combination 1
2
3
4I
5
6
7
8
:B Left
P
I NB Left P
Thru
P
I
Thru
P
Right
P
P
I
Right P
P
Peds
I
Peds
'B Left
P
I SB Left P
Thru
P
I
Thru
P
Right
P
P
I
Right P
P
Peds
I
Peds
B Right
P
P
I EB Right P
P
B Right
P
P
I WB Right P
P
reen
25.0 30.0
20.0 15.0
ellow
11 Red
0.0 0.0
0.0 0.0
ycle Length: 90.0
secs
Intersection Performance Summary
pprl Lane
Adj Sat
Ratios
Lane Group Approach
3ne Group
Flow Rate
rp
Capcity
(s)
vic
g/C
Delay LOS Delay LOS
3.stbound
501
1805
0.83
1203
3610
0.62
1615
1615
0.03
:=stbound
501
, 1805
0'.44
1203
3610
0.67
1615
1615
0.27
)rthbound
401
1805
0.14
317
1900
0.26
1615
1615
0.04
u t.hbound
401
1805
0.83
317
1900
0.09
1615
1615
0.00
Intersection Delay = 28.4
0.278 45.4 D 0.333 27.7 C 1. 000 0.0+ A
32.8 C
0.278 29.6 C
0.333 28.7 C
1.000 0.4
A
20.3 C
0.222 28.8 C 0.167 34.7 C 1.000 0.0+ A
22.5 C
0.222 51.2 D
0.167 32.3 C 49.7 D
1.000 0.0
A
(sec/veh) Intersection LOS = C
HCS: Signals Release 3.1b
'hone:
Fax:
:-Mail:
_ _ _ _ _ _ _ _ _ _ _ _ _ _OPERATIONAL 'ANALYSIS
_
ntersection: ity/State: nalyst: roject No: ime Period Analyzed: ate: ast/West Street Name: orth/South Street Name:
Marine Road @ UGR
STP-OOMS(7) 2025AM 4/13/01 Union Grove Road Marine Rd./Mohawk Ind.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME DATA.
,........-
_
I Eastbound IL T R
I Westbound 1L T R
/ Northbound
IL T R
I Southbound IL T R
01 ume HF
1 I 375-
---
675
--
100
-
1-
/ 200
---
725
--
500
-
1 I 50
-
--
75
-
--
75
-
1 I 300-
--
25
-_ _-
225
I 0 . 90 0.90 0.90 I 0 . 90 0.90 0.90 / 0 . 90 O. 90 O. 90 I 0 . 90 0.90 0.90
K 15 Vol 1104 188 28 /56 201 139 114 21 21183 7
63
i Ln Vol I
I
I
I
Grade
/
0
/
0
I
0
I
0
jeal Sat /1900 1900 1900 /1900 1900 1900 /1900 1900 1900 11900 1900 1900
~rkExist I
I
I
I
-lmPark
I
I
I
I
Heavy vehlO
0
0
o . Lanes I 1 2 1
;Config I L T
R
10 0 0
I121
1 LT R
10 0 0
I111 I L T 'R
10 0 0
I 1, 1 1 I L' T R
lne Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0
roR Vo 1 I
60 I
100 I
20 1
22 5
:Ij Flow 1417 750 44 1222 806 444 156 83 61 1333 28 0
[nSharedLn I
I
I
I
rop Turns I
I
I
I
ImPedsl
oI
oI
oI
o
unBus
I0 o o I0 o o I0 o o I0 o o
rra t i.on
0.25
Area Type: All other areas
OPERATING PARAMETERS
I Eastbound
IL T R
I
nit Unmet 10.0 0.0 0.0
rriv. Type I3
3
3
nit Ext. 13.0 3.0 3.0
Factor I
1.000
ost Time 12.0 2.0 2.0
xt of g 12.0 2.0 2.0
ed Min g I
0.0
I Westbound
IL T R
I
10.0 0.0 0.0
13
3
3
13.0 3.0 3.0
I
1. 000
12.0 2.0 2.0
12.0 2.0 2.0
I
0.0
I Northbound
IL T R
I
10.0 0.0 0.0
13
3
3
13.0 3.0 3.0
I
1. 000
12.0 2.0 2.0
12.0 2.0 2.0
I
0.0
I Southbound
IL T R
I
10.0 0.0 0.0
13
3
3
13.0 3.0 3.0
I
1. 000
12.0 2.0 2.0
12.0 2.0 2.0
I
0.0
PHASE DATA
hase Combination 1
2
3
4
5
6
7
8
B Left Thru Right Peds
P
P
P
P
NB Left P
Thru
P
Right P
P
Peds
B Left Thru Right Peds
P
P
P
P
SB Left P
Thru
P
Right P
P
Peds
3 Right
P
P
EB Right P
P
3 Right
P
P
WB Right P
P
ceen
=llow 11 Red
25.0 30.0 0.0 0.0
(cle Length: 90.0
secs
20.0 15.0 0.0 0.0
VOLUME ADJUSTMENT WORKSHEET
.ppr . /
Mvt
Iovement Volume PHF
Adjusted
Prop. Prop.
Flow No. Lane
Flow Rate Left Right
Rate Lanes Group RTOR In Lane Grp Turns Turns
.as t bourid
Left
375
0.90 417
1
L
417
Thru
675
0.90 750
2
T
750
Right 100
0.90 44
1
R
60
44
restbound
Left
200
0.90 222
1
L
222
Thru
725
0.90 806
2
T
806
Right 500
0.90 444
1
R 100
444
'o r t hbound
Left
50
0.90 56
1
L
56
Thru
75
0.90 83
1
T
83
Right 75
0.90 61
1
R
20
61
outhbound
Left
300
0.90 333
1
L
333
Thru
25
0.90 28
1
T
28
Right 225
0.90 0
1
R
225
0
Value entered by user.
SATURATION FLOW ADJUSTMENT WORKSHEET
ppr/ Ideal
ane Sat f
f
f
f
f
f
f
f
f
roup Flow W
HV
G
P
BB
A
LV RT
LT
3.stbound 1900 1900 1900
1.000 1. 000 1.000
1. 000 1.000 1.000
1.000 1.000 1.000
1.000 1.000 1.000
Sec LT Adj/LT Sat: 1.000 1.00 1. 00 1.000 1. 00 0.95 1. 000 1. 000 1. 00 1.00 0.850
0.950 1.000
=stbound 1900 1900 1900
1. 000 1.000 1. 000
1.000 1. 000 1.000
1.000 1.000 1.000
1.000 1. 000 1.000
Sec LT Adj/LT Sat: 1. 000 1. 00 1. 00 1. 000 1. 00 0.95 1. 000 1.000 1. 00 1.00 0.850
0.950 1.000
or t.hbourid 1900 1900 1900
1. 000 1.000 1.000
1.000 1.000 1.000
1.000 1.000 1.000
1. 000 1. 000 1.000
Sec LT Adj/LT Sat: 1.000 1. 00 1. 00 1.000 1. 00 1. 00 1.000 1.000 1. 00 1. 00 0.850
0.950 1. 000
u t.hbourid 1900 1900 1900
1. 000 . 1.000 1.000 1.000 1. 000 1.000
1.000 1.000 1.000
1.000 1.000 1.000
Sec LT Adj/LT Sat: 1.000 1. 00 1. 00 1.000 1. 00 1. 00 1.000 1.000 1. 00 1. 00 0.850
0.950 1.000
Adj Sat Flow
1805 3610 1615
1805 3610 1615
1805 1900 1615
1805 1900 1615
.-
Appr/ Lane Mvmt Group
CAPACITY ANALYSIS WORKSHEET
Adj
Adj Sat Flow
Green
Flow Rate Flow Rate Ratio
Ratio
(v)
(s 2
(v / s)
(g/C)
--Lane Group--
Capacity vic
(c)
Ratio
astbound Pri. Sec. Left L Thru T Right R
estbound Pri. Sec. Left L Thru T Right R
orthbound Pri. Sec. Left L Thru T Right R
outhbound Pri. Sec. Left L Thru T Right R
417
1805
# 0.23
0.278 501
0.83
750
3610
0.21
0.333 1203
0.62
44
1615
0.03
1.000 1615
0.03
222
1805
0.12
0.278 501
0.44
806
3610
# 0.22
0.333 1203
0.67
444
1615
0.27
1. 000 1615
0.27
56
1805
0.03
0.222 401
0.14
83
1900
# 0.04
0.167 317
0.26
61
1615
0.04
1.000 1615
0.04
333
1805
# 0.18
0.222 401
0.83
28
1900
0.01
0.167 317
0.09
a
1615
0.00
1.000 1615
0.00
Sum (vis) critical = 0.68
ost Time/Cycle, L = 0.00 sec Critical v/c{X)
= 0.68
ppr/ Ratios Dnf
ane
Del
rp vic g/C . d1
LEVEL OF SERVICE WORKSHEET
Prog Lane Incremental Res
Adj Grp Factor Del Del
Fact Cap k
d2
d3
Lane Group Delay LOS
Approach Delay LOS
astbound
0.83 0.278 30.5 1.000 501 0.50 14.9 0.0 45.4 D
0.62 0.333 25.2 '1. 000 1203 0.50 2.4 0.0 27.7 C
0.03 1.000 0.0 1.000 1615 0.50 0.0 0.0 0.0+ A
estbound
0.44 0.278 26.8 1. 000 501 0.50 2.8 0.0 29.6 C
0.67 0.333 25:8 1.000 1203 . .0.50 3.0 0.0 28.7 C
0.27 1. 000 0.0 1.000 1615 0.50 0.4 0.0 0.4
A
orthbound
0.14 0.222 28.1 1. 000 401 0.50 0.7 0.0 28.8 C
0.26 0.167 32.7 1.000 317 0.50 2.0 0.0 34.7 C
0.04 1.000 0.0 1.000 1615 0.50 0.0 0.0 0.0+ A
outhbound
0.83 0.222 33.4 1.000 401 0.50 17.8 0.0 51. 2 D
0.09 0.167 31.7 1. 000 317 0.50 0.5 0.0 32.3 C
0.00 1.000 0.0 1.000 1615 0.50 0.0 . O. a 0.0
A
32.8 C 20.3 C 22.5 C 49.7 D
Intersection Delay = 28.4 (sec/veh) Intersection LOS = C
_______________________SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts
APPROACH
EB WB NB
ycle Length, C 90.0
sec
.ctualGreen Time for Lane Group, G
:ffective Green Time for Lane Group, 9
opposing Effective Green Time, go
"umber of Lanes in Lane Group, N
"umber of Opposing Lanes, No
djusted Left-Turn Flow Rate, Vlt
"roportion of Left Turns in Opposing Flow, Plto
djusted Opposing Flow Rate, Vo
ost Time for Lane Group, tl
eft Turns per Cycle: LTC=VltC/3600
pposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
pposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
f=[Gexp(- a * (LTC ** b))]-tl, gf<=g
pposing Queue Ratio: qro=I-Rpo(go/C)
q=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
u =g-gq if gq>=gf, =g-gf if gq<gf
=(gq-gf)/2, n>=O
tho=I-Plto
1*=Plt[I+{(N-l)g/(gf+gu/Ell+4.24)) )
11 (Figure 9-7)
12=(I-Ptho**n)/Plto, E12>=1.0
min=2(I+Plt)/g or fmin=2(I+Pl)/g
diff=max(gq-gf;O)
m=[gf/g]+[gli/g] [1/{I+Pl(Ell-l)}], (min=fmin;max=I.00)
It=fm=[gf/g]+gdiff[I/{I+Plt(E12-1) }]
[gu/g] [l/(l+Plt(Ell-l)], (min=fmin;max=I.0) or flt=[fm+0.91(N-l)]/N**
fIt
__ SB
or special case of single-lane approach opposed "by multilane approach,
ee text.
If pl>=l for shared left-turn lanes with N>l, then assume de-facto
left-turn "lane and redo calculations.
* For permitted left-turns with multiple exclusive left-turn lanes, flt=fm.
or special case of multilane approach opposed by single-lane approach
r when gf>gq, see text.
"
_______________________SUPPLMENTAL PERMITTED LT WORKSHEET for shared lefts
__ ~------ ~
APPROACH
EB WB
NB
SB
:ycle Length, C 90.0
sec
~ctual Green Time for Lane Group, G
~ffective Green Time for Lane Group, 9
)pposing Effective Green Time, go
Jumber of Lanes in Lane Group, N
JUmber of Opposing Lanes, No
.djusted Left-Turn Flow Rate, Vlt
'roportion of Left Turns in Lane Group, Plt
'roportion of Left Turns in Opposing Flow, Plto
,djusted Opposing Flow Rate~ VO
.o s t; Time for Lane Group, tl
,eft Turns per Cycle: LTC=VltC/3600
'pposing Flow per Lane; Per Cycle: Volc=VoC/3600fluo
'pposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
f=[Gexp(- a * (LTC ** b))]-tl, gf<=g
opposing Queue Ratio: qro=l-Rpo(go/C)
q=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
u .=g-gq if gq>=gf, =g-gf if gq<gf
.=(gq-gf)/2, n>=O
tho=l-plto
l*=Plt[I+{ (N-l)g/(gf+gu/Ell+4.24)))
11 "(F''i.qu r e 9-7)
12=(1-Ptho**n)/Plto, E12>=1.0
min=2(1+Plt)/g or fmin=2(I+Pl)/g
diff=max(gq-gf,O)
m=[gf/g]+[gu/g] [1/{I+Pl(Ell-l)}], (min=fmin;max=I.00)
It=fm=[gf/g]+gdiff[I/{1+Plt(E12-1)}]
[gu/g] [l/(l+Plt(Ell-l)], (min=fmin;max=l.O) or flt=[fm+0.91(N-l)]/N**.
flt Primary
.
or special case of single-lane approach opposed by multilane approach,
ee text.
If pl>=1 for shared left-turn lanes with N>l, then assume de-facto
left-turn lane and redo calculations.
* For permitted left-turns with multiple exclusive left-turn lanes, flt=fm.
Jr special case of multilane approach opposed by single-lane approach
r when gf>gq, see text.
.
______________________SUPPLEMENTAL UNIFORM DELAY WORKSHEET
_
\dj. LT Vol from Vol Adjustment Worksheet, v
ric ratio from Capacity Worksheet, X
)rimary phase effective green, g
;econdary phase effective green, gq'
:From Supplemental Permitted LT Worksheet), gu
:ycle length, C 90~0
Red =lC-g-gq-gu), r
~rrivals: v/(3600(max(X,l.0))), qa
>rimary ph. departures: s/3600, sp
:econdary ph. departures: s(gq+gu)/(gu*3600), ss
.Perrn
.Pro t;
.Ca s e
'ueue at beginning of green arrow, Qa
'ueue a~ beginning of unsaturated green, Qu
.esidual queue, Qr
rtiform Delay, dl
EBLT WBLT NBLT SBLT
DELAY/LOS WORKSHEET WITH INITIAL QUEUE
pprl
ane roup
Initial Dur. Unmet Unmet Demand Demand Q veh t hrs.
Uniform Delay
Unadj. Adj.
ds
dl sec
Initial Final
Queue Unmet
Paramo . Demand
u
Q veh
Initial Lane Queue Group Delay Delay d3 sec d sec
astbound
estbound
Jrthbound
)uthbound
Intersection Delay 28.4 sec/veh
Intersection LOS C
_________________ERROR MESSAGES
_
No errors to report.
HCS: Signals Release 3.1b
:nter:
.na I y s t.:
ia t e : 4 I 13 I 01 :/W St: Union Grove Road
City/St: Proj #: STP-OOMS(7) Period: 2025PM N/S St: Marine Rd./Mohawk Ind.
_ _ _ _ _-:-~
SIGNALI ZED INTERSECTION SUMMARY._---,_--=-_--:-:-
I Eastbound
1 Westbound
I Northbound I Southbound
IL T R IL T R IL T R IL T R
-,--_
1------1
1------1-----_
o. Lanes 1112 1 1 2 1 1 1 1 1 I I I 1
GConfig 1 L T
R I LT
R I L TRI L T
R
olume
1225 725 50 175 675 300 1100 125 200 /500 75 375
ane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0
.TOR Vol I
50 I
100 I
20 1
240
uration
0.25
hase Combination 1
B Left
P
Thru
Right
P
Peds
B Left
P
Thru
Right
P
Peds
BRight
P
BRight
P
reen
20.0
ellow
2
P P
P P
P P
30.0
5
6
7
8
Left P
Thru
P
Right P
P
Peds
Left P
Thru
p
Right p.
P
Peds
Right P
P
Right P
P
30.0 10.0
11 Red
0.0 0.0
ycle Length: 90.0
0.0 0.0
Summary
_
pprl :::tne rp
Lane Group Capcity
vic
g/C
Lane Group Approach Delay LOS Delay LOS
:::tstbound
401
18.05
0.62
1203
3610
0.67
1615
1615
0.00
2stbound
401
1805
0.21
1203
3610
0.62
1615
1615
0.14
:)rthbound
602
1805
0.18
21.1
1900
0.66
1615
1615
0.12
:)uthbound
602
1805
0.92
211
1900
0.39
1615
1615
0.09
Intersection Delay = 30.6
0.222 38.7 D
0.333 28.7 C
1.000 0.0
A
31.1 C
0.222 29.7 C 0.333 27.7 C 1. 000 0 ..2 A
22.1 C
0.333 22.0 C
0.111 53.4 D
1.000 0.2
A
22.0 C
0.333 50.9 D
0.111 42.6 D 40.4 D
1.000 0.1
A
(sec/veh) Intersection LOS = C
HCS: Signals Release 3.1b
I
'hone:
Fax:
:-Mail:
_ _ _ _ _ _ _ _ _ _ _ _ _ _OPERATIONAL ANALYSIS
-,.
_
ntersection: :ity/State: nalyst: 'ro j ec t; No: 'ime Period Analyzed: tate: :ast/West Street Name: ~rth/South Street Name:
STP-OOMS(7) 2025PM 4/13/01 Union Grove Road Marine Rd./Mohawk Ind.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _VOLUME DATA,
_
'Eastbound
I Westbound
I Northbound I Southbound
IL T R IL T R IL T R IL T R
olume
1-------1-------1------,'-=--:------
1225 725 50 175 675 300 1100 125 200 1500 75 375
HF
10.90 0.90 0.90 10.90 0.90 0.90 10.90 0.90 0.90 10.90 0.90 0.90
K 15 Vol 163 201 14 121 188 83 128 35 56 1139 21 104
i Ln Vol I
I
I
I
Grade
I,
0
'0
I
0
I
0
deal Sat 11900 1900
arkExist I
umPark
I
Heavy Veh 10
0
o. Lanes I 1 2
3Config I L T
1900
0 1 R
/1900
1
I
,0
I1 IL
1900 1900 11900
I I o o 10 21 I1
TRI L
1900
0 1
T
1900
0 1 R
11900
1
I
10
I1 IL
1900
0 1
T
1900
0 1 R
3ne Width /12.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0
rOR Vol I
50 I
'100 ' 2 0 1
240
:1j Flow 1250 806 0
InSharedLnl
LOp Turns I
.lmPeds
I
o
.imfsu s
I0 o o
183 750 222 1111 139 200 1556 83 150
I
I
I
I
I
I
I
oI
oI
o
I0 o o I0 o o /0 o o
.lration
0.25
Area Type: All other areas
OPERATING PARAMETERS
I Eastbound IL T R
1
nit Unmet 10.0 0.0 0.0
rriv. Type I3
3
3
nit Ext. 13.0 3.0 3.0
Factor I
1. 000
ost Time 12.0 2.0 2.0
xt of g 12.0 2.0 2.0
ed Min g I
0.0
I westbound
IL T R
I
10.0 0.0 0.0
13
3
3
13.0 3.0 3.0
I
1.000
12.0 2.0 2.0
12.0 2.0 2.0
I
0.0
I Northbound
IL T R
I
10.0 0.0 0.0
13
3
3
13.0 3.0 3.0
I
1. 000
12.0 2.0 2.0
12.0 2.0 2.0
I
0.0
I Southbound IL T R I
10.0 0.0 0.0
13
3 3
/3.0 3.0 3.0
I
1. 000
12.0 2.0 2.0
12.0 2.0 2.0
I
0.0
PHASE DATA
hase Combination 1
2
3
4
5
6
7
8
B Left Thru Right Peds
P
P
P
P
NB Left P
Thru
P
Right P
P
Peds
B Left Thru Right Peds
P
P
P
P
SB Left P
Thru
P
Right P
P
Peds
B Right
P
P
EB Right P
P
B Right
P
P
WB Right P
P
reen e110w 11 Red
20.0 30.0 0.0 0.0
yc1e Length: 90.0
secs
30.0 10.0 0.0 0.0
VOLUME ADJUSTMENT WORKSHEET
ppr. /
Mvt
overnerit, Volume PHF
Adjusted
Prop. Prop.
Flow No. Lane
Flow Rate Left Right
Rate Lanes Group RTOR In Lane Grp Turns Turns
astbound
Left
225
0.90 250
1
L
250
Thru
725
0.90 806
2
T
806
Right 50
0.90 a
1
R
50
a
estbound
Left
75
0.90 83
1
L
83
Thru
675
0.90 750
2
T
750
Right 300
0.90 222
1
R 100
222
orthbound
Left
100
0.90 111
1
L
111
Thru
125
0.90 139
1
T
139
Right 200
0.90 200
1
R 20
200
outhbound
Left
500
0.90 556 .1
L
556
Thru 75
0.90 83
1T
83
Right 375
0.90 150
1
R
240
150
Value entered by user.
SATURATION FLOW ADJUSTMENT WORKSHEET
ppr/ Ideal
Adj .
3.ne Sat f
f
f
f
f
f
f
f
f
Sat
LOup Flow W
HV
G
P
BB
A
LU RT
LT
Flow
3.stbound 1900 1900 1900
1.000 1.000 1. 000
1. 000 1. 000 1.000
1.000 1. 000 1. 000
1.000 1. 000 1. 000
Sec LT Adj/LT Sat: 1.000 1. 00 1. 00 1.000 1. 00 0.95 1. 000 1.000 1. 00 1. 00 0.850
0.950 1.000
1805 3610 1615
2stbound 1900 1900 1900
1. 000 1.000 1.000
1.000 1. 000 1. 000' 1. 000 1. 000 1. 000
1.000 1. 000 1.000
Sec LT Adj/LT Sat: 1.000 1. 00 1. 00 1.000 1. 00 0.95 1.000 1.000 1. 00 1. 00 0.850
0.950 1.000
)rthbound 1900 1900 1900
1.000 1. 000 1.000
1.000 1.000 1. 000
1. 000 1.000 1.000
1. 000 1.000 1.000
Sec LT Adj/LT Sat: 1.000 1. 00 1. 00 1.000 1. 00 1. 00 1.000 1.000 1.00 1. 00 0.850
0.950 1.000
)uthbound 1900 1900 1900
1.000 1.000 1.000
1.000 1. 000 1.000
1.000 1.000 1.000
1.000 1.000 1.000
Sec LT Adj/LT Sat: 1.000 1. 00 1. 00 1.000 1. 00 1. 00 1. 000 1.000 1. 00 1. 00 0.850
0.950 1.000
1805 3610 1615
1805 1900 1615
1805 1900 1615
,' . .
-----
Appr/ Lane Mvmt Group
CAPACITY ANALYSIS WORKSHEET
Adj
Adj Sat Flow
Green
Flow Rate Flow Rate Ratio
Ratio
(v)
(s)
(v/s)
(g/C)
--Lane Group--
Capacity vic
(c)
Ratio
astbound Pri. Sec. Left L Thru T Right R
estbound Pri. Sec. Left L Thru T Right R
orthbound Pri. Sec. Left L Thru T Right R
outhbound Pri. Sec. Left L Thru T Right R
250
1805
# 0.14
0.222 401
0.62
806
3610
# 0.22
0.333 1203
0.67
0
1615
0.00
1. 000 1615
0.00
83
1805
0.05
0.222 401
0.21
750
3610
0.21
0.333 1203
0.62
222
1615
0.14
1. 000 1615
0.14
111
1805
0.06
0.333 602
0.18
139
1900
# 0.'07
0.111 211
0.66
200
1615
0.12
1. 000 1615
0.12
556
1805
# 0.31
0.333 602
0.92
83
1900
0.04
0.111 211
0.39
150
1615
0.09
1.000 1615
0.09
:)st Time/Cycle, L = 0.00 sec
Sum (vis) critical = 0.74
Critical vic (X)
= 0.74
~pr/ Ratios Unf
arie
Del
r-p vic g/C d1
LEVEL OF SERVICE WORKSHEET
Prog Lane Incremental Res
Adj Grp Factor Del Del
Fact Cap k
d2
d3
Lane Group Delay LOS
Approach Delay LOS
:J.stbound
0.62 0.222 31.6 1. 000 401 0.50 7.1 0.0 38.7 D
0.67 0.333 25.8 1. 000 1203 0.50 3.0 0.0 28.7 C
0.00 1. 000 0.0 1.000 1615 0.50 0.0 0.0 0.0
A
3stbound
0.21 0.222 28.5 1. 000 401 0.50 1.2 0.0 29.7 C
0.62 0.333 25.2 1.000 1203 0.50 2.4 0.0 27.7 C
0.14 1. 000 0.0 1.000 1615 0.50 0.2 0.0 0.2
A
)rthbound
0.18 0,333 21.3 1. 000 602 0.50 0.7 0.0 22.0 C
0.66 0.111 38.4 1.000 211 0.50 15.0 0.0 53.4 D
0.12 1.000 0.0 1. 000 1615 0.50 0.2 0.0 0.2
A
u t.hbourid
0.92 0.333 28.9 1.000 602 0.50 22.0 0.0 50.9 D
0.39 0.111 37.2 1.000 211 0.50 5.4 0.0 42.6 D
0.09 1.000 0.0 1.000 1615 0.50 0.1 0.0 0.1
A
31.1 C 22.1 C 22.0 C 40.4 D
Intersection Delay = 30.6 (sec/veh) Intersection LOS = C
_______________________SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts
APPROACH
EB WB NB
ycle Length, C 90.0
sec
ctual Green Time for Lane Group, G
ffectiveGreen Time for Lane Group, g
pposing Effective Green Time, go
umber of Lanes in Lane Group, N
umber of Opposing Lanes, No
jjusted Left-Turn Flow Rate, Vlt
roportion of Left Turns in Opposing Flow, Plto
jjusted Opposing Flow Rate, Vo
Jst Time for Lane Group, tl
eft Turns per Cycle: LTC=VltC/3600
pposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
~posing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
f=[Gexp(- a * (LTC ** b)))-tl, gf<=g
~posing Queue Ratio: qro=l-Rpo(go/C)
:r= (4. 943Volc**0. 762) (qro**l. 061) -tl, gq<=g
~ =g-gq if gq>=gf, =g-gf if gq<gf
=(gq-gf)/2, n>=O
tho=l-plto
1*=Plt[l+{(N-1)g/(gf+gu/El1+4.24)) )
11 (Figure 9-7)
12=(1-Ptho**n)/Plto, E12>=1.0
nin=2(l+Plt)/g or fmin=2(1+Pl)/g
jiff=max(gq-gf,O)
n= [gf/g) + [gu/g) [11 {l+Pl (El1-1))), (min=fmin;max=l. 00)
1t=fm=[gf/g]+gdiff[1/{1+Plt(E12-1)}]
[gu/g) [11 (l+Plt (El1-1)], (min=fmin;max=l. 0) or flt= [fm+O. 91 (N-1)) IN**
flt
__ SB
)r special case of single-lane approach opposed by multilane approach, ~e text.
If Pl>=l for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations. ~ For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. )r special case of multilane approach opposed by single-lane approach ~ when gf>gq, see text~
- - - - - - - - - - - -SUPPLEMENTAfoL r PEshRMarIeTdTEDleLfTtsWORKSHEET- - - - - - - - - - - -
APPROACH
EB WB NB SB
ycle Length, C 90.0
sec
ctual Green Time for Lane Group, G
ffective Green Time for Lane Group, 9
pposing Effective Green Time, go
umber of Lanes in Lane Group, N.
umber of Opposing Lanes, No
djusted Left-Turn Flow Rate, Vlt
roportion of Left Turns in Lane Group, pIt
roportion of Left Turns in Opposing Flow, Plto
djusted Opposing Flow Rate~ Vo
~st Time for Lane Group, tl
eft Turns per Cycle: LTC=VltC/3600
pposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
9posing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
f=[Gexp(- a * (LTC ** b))]-tl, gf<=g
pposing Queue Ratio: qro=l-Rpo(goIC)
::r=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
J =g-gq if gq>=gf, =g-gf if gq<gf
=(gq-gf)/2, n>=O
tho=l-plto
1*=Plt[l+{(N-1)g/(gf+gu/El1+4.24)) )
11 (Figure 9-7)
12=(1-Ptho**n)/Plto, E12>=1.0
nin=2(1+Plt)/g or fmin=2(1+Pl)/g
jiff=max(gq-gf,O)
n=[gf/g]+[gu/g] [l/{1+Pl(El1-1)}], (min=fmin;max=1.00)
Lt=fm=[gf/g]+gdiff[l/{1+Plt(E12-1)}]
[gu/g] [11 (l+Plt (El1-1)], (min=fmin;max=l. 0) or flt= [fm+O. 91 (N-1)] IN**
fIt Primary
)r special case of single-lane approach opposed by multilane approach, se text. If Pl>=l for shared left-turn lanes with N>l, then assume de~facto left-turn lane and redo calculations. < For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. )r special case of multilane approach opposed by single-lane approach ~ when gf>gq, see text.
______________________SUPPLEMENTAL UNIFORM DELAY WORKSHEET
_
dj. LT Vol from Vol Adjustment Worksheet, v /c ratio from capacity Worksheet, X rimary phase effective green, g econdary phase effective green, gq From Supplemental Permitted LT Worksheet), gu ycle length, C 90.0 Red =(C-g-gq-gu), r rrivals: v/{3600{max{X,1.0), qa rimary ph. departures: s/3600, sp econdary ph. departures: s{gq+gu)/{gu*3600), ss
Perm Prot Case ueueat beginning of green arrow, Qa ueue at beginning of unsaturated green, Qu esidual queue, Qr niform Delay, dl
EBLT WBLT NBLT SBLT
DELAY/LOS WORKSHEET WITH INITIAL QUEUE
ppr z' :ine coup
Initial Dur. Unmet Unmet Demand Demand Q veh t hrs.
Uniform Delay
Unadj. Adj.
ds
dl sec
Initial Final Initial Lane
Queue Unmet Queue Group
Paramo Demand" Delay Delay
u
Q veh d3 sec d sec
:istbound
~stbound
)rthbound
ou t.hbound
Intersection Delay 30.6 sec/veh
Intersection LOS C
_ _ _ _ _---'-
ERROR MESSAGES,
_
No errors to report.
HCS: Signals Release J.lb
nter: CR 68 @ UGR
.na Lys t.:
la t e : 4 I 12 I 01 :/W St: Union Grove Rd.
City/St: Prpj #: STP-OOMS(7) Period: 2025AM N/S St~ CR 68/Belwood/Johnson Lake
o. Lanes GConfig olume ane Width TOR Vol
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
IL T R IL T R IL T R
I
I
I
I121 I121 I111
I LT R I LT R I LT R
1335 380 60 130 670 100 190 90 20
112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0
I
60 I
100 I
20
1 Southbound
IL T R I
I111
I L T R
150 60 240
112.0 12.0 12.0
I
240
uration
0.25
Area Type: All other areas
Signal Operations
hase Combination 1
2
3
4I
5
6
7
8
B Left
P
I NB Left P
Thru
P
I
Thru
P
Right
P
P
I
Right P
P
Peds
I
Peds
B Left Thru
P P
1 SB Left P
I
Thru
P
Right
P
P
I
Right P
P
Peds
I
Peds
B Right
P
P
I EB Right P
P
B. Right
P
P
I WB Right P
P
reen
20.0 30.0
15.0 15.0
ellow
11 Red
0.0 0.0
0.0 0.0
ycle Length: 80.0
secs
Intersection Performance Summary
;:>prl Lane
Adj Sat
Ratios
Lane Group Approach
ane
Group
Flow Rate
r-p . Capcity
(s )
vic
g/C
Delay LOS Delay LOS
:istbound
451
1805
0.82
1354
3610
0.31
1615
1615
0.00
"!stbound
451
1805
0.07
1354
3610
0.55
1615
1615
0.00
rt hbound
338
1805
0.30
356
1900
0.28
1615
1615
0.00
mthbound
338
1805
0.17
356
1900
0.19
1615
1615
0.00
Intersection Delay = 26.5
0.250 44.0 D 0.375 18.3 B 1.000 0.0 A
30.3 C
0.250 23.2 C
0.375 21.3 C
1.000 0.0
A
21. 4 C
0.188 30.2 C
0.188 29.8 C
1.000 0.0
A
30.0 C
0.188 28.3 C
0.188 28.5 C 28.4 C
1.000 0.0
A
(sec/veh) Intersection LOS = C
HCS: Signals Release 3.1b
-horie :
Fax:
:-Mail:
_____________________________OPERATIONAL ANALYSIS
__
:ntersection: 'L ty / State: nalyst: 'roject No: 'ime Period Analyzed: late:
:ast/West Street Name : ~rth/South Street Name:
CR 68 @ UGR
STP-OOMS(7) 2025AM 4/12/01 Union Grove Rd. CR 68/Belwood/Johnson Lake
________________________-'--
VOLUME DATA
_
I Eastbound
I Westbound
I Northbound '" Southbound I
I L T R I L TR I L T R I L T R 1
olume HF K 15 Vol
1------1------1------1 1335 380 60 130 670 100 190 90 20 150
60
240 II
10.90 0.90 0.90 /0.90 0.90 0.90 10.90 0.90 0.90 10.90 0.90 0.90 I
193 106 17 18
186 28 125 25 6
114 17 67 I
i Ln Vol I
II
I
I
Grade
I
0
I
0
I
0
I
0
I
deal Sat /1900 1900 1900 /1900 1900 1900 11900 1900 1900 11900 1900 1900 I
arkExist I
I
I
I
I
umPark
I
I"
I
I
I
Heavy Veh 10
0
0
10
0
0
10
0
0
10
0
0
I
o . Lanes I 1 2 1 I 1 2 1 . / 1 1 1 I 1 1 1 I
3Config I L T R I L T R I L T R I L T R I
~ne Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 I
rOR Vol I
60 I
100 I
20 I
240 I
jj Flow 1372 422 0
133 744 0
1100 100 0
156 67 0
I
InSharedLn I
I
1
I
I
rop Turns I
I
I
I
I
~mPeds
I
oI
oI
oI
0I
.imfsu s
10 o o 10 o o 10 o o 10 0 0 I
.i r a t Lon
0.25
Area Type: All other areas
I Eastbound
IL T R
I
nit Unmet 10.0 0.0 0.0
.rriv. Type I3
3
3
"nit Ext. 13.0 3.0 3.0
Factor I
1. 000
-os t; Time 12.0 2.0 2.0
xt of g 12.0 2.0 2.0
ed Min g I
0.0
hase Combination 1
2
B Left Thru Right Peds
p
P
p
P
B Left Thru Right Peds
P
P
P
P
B Right
P
P
B Right
P
P
OPERATING PARAMETERS
, Westbound
IL T R
I
10.0 0.0 0.0
13
3
3
13.0 3.0 3.0
I
1.000
12.0 2.0 2.0
12.0 2.0 2.0
I
0.0
I Northbound
IL T R
I
10.0 0.0 0.0
13
3
3
13.0 3.0 3.0
I
1.000
12.0 2.0 2.0
12.0 2.0 2.0
I
0.0
1 Southbound
IL T R
I
10.0 0.0 0.0
'"3
3
3
13.0 3.0 3.0
I
1.000
/2.0 2.0 2.0
1I 2".0
2.0 0.0
2.0
PHASE DATA
3
4
5
6
7
8
NB Left P
Thru
p
Right p
P
Peds
SB Left P
Thru
p
Right P
p
Peds
EB Right P
p
WB Right P
P
r-een 2110w l L Red
20,0 30.0 0.0 0.0
{cle Length: 80.0
secs
15.0 15.0 0.0 0.0
.,.
VOLUME ADJUSTMENT WORKSHEET
l\ppr. /
Mvt
'1ovement Volume PHF
Adjusted Prop. Prop.
Flow No. Lane
Flow Rate Left Right
Rate Lanes Group RTOR In Lane Grp Turns Turns
~astbound
Left
335
0.90 372
1
L
372
Thru
380
0.90 422
2
T
422
Right 60
0.90 a
1
R
60
a
vestbound
Left
30
0.90 33
1
L
33
Thru
670
0.90 744
2
T
744
Right 100
0.90 a
1
R
100
a
Jorthbound
Left
90
0.90 100
1
L
100
Thru
90
0.90 100
1
T
100
Right 20
0.90 a
1
R
20
a
iouthbound
. Left
50
0.90 56
1
L
56
Thru
60
0.90 67
1
T
67
Right 240
0.90 a
1
R
240
a
Value entered by user.
SATURATION FLOW ADJUSTMENT WORKSHEET
.ppr/ Ideal
Adj
-arie Sat f
f
f
f
f
f
f
f
f
Sat
roup Flow W
HV
G
P
BB
A
LU RT
LT
Flow
astbound 1900 1900 1900
1. 000 1. 000 1.000
1. 000 1.000 1.000
1. 000 1.000 1. 000
1. 000 1.000 1.000
Sec LT Adj/LT Sat: 1. 000 1. 00 1. 00 1. 000 1. 00 0.95 1.000 1. 000 1. 00 1. 00 0.850
0.950 1. 000
1805 3610 1615
estbound 1900 1900 1900
1.000 1. 000 1. 000
1. 000 1. 000 1.000 1.000 1. 000 1.000
1.000 1. 000 1. 000
Sec LT Adj/LT Sat: 1.000 1. 00 1. 00 1. 000 1. 00 0.95 1. 000 1.000 1.00 1. 00 0.850
0.950 1. 000
1805 3610 1615
:>rthbound 1900 1900 1900
1.000 1. 000 1. 000
1. 000 1.000 1.000
1.000 1.000 1.000 1. 000 1.000 1. 000
Sec LT Adj/LT Sat: 1. 000 1. 00 1. 00 1.000 1. 00 1. 00 1.000 1.000 1. 00 1. 00 0.850
0.950 1. 000
)uthbound 1900 1900 1900
1.000 1.000 1.000
1.000 1.000 1.000
1. 000 1.000 1.000
1.000 1.000 1.000
Sec LT Adj/LT Sat: 1.000 1. 00 1. 00 1. 000 1. 00 1. 00 1.000 1.000 1. 00 1. 00 0.850
0.950 1.000
1805 1900 1615
1805 1900 1615
--;--,----;;;,
Appr/ Lane Mvmt Group
CAPACITY ANALYSIS WORKSHEET
Adj
Adj Sat Flow
Green
Flow Rate Flow Rate Ratio
Ratio
(v)
(s )
(v / s )
(g/C)
--Lane Group--
Capacity vic
(c)
Ratio
~astbound
Pri. Sec. Left L Thru T Right R lestbound Pri. Sec. Left L Thru T Right R rorthbound Pri ..
Sec. Left L Thru T Right R outhbound Pri. Sec. Left L Th~ T Right R
372
1805
# 0.21
0.250 451
0.82
422
3610
0.12
0.375 1354
0.31
0
1615
0.00
1. 000 1615
0.00
33
1805
0.02
0.250 451
0.07
744
3610
# 0.21
0.375 1354
0.55
0
1615
0.00
1.000 1615
0.00
100
1805
# 0.06
'0.188 338
0.30
100
1900
# 0.05
0.188 356
0.28
0
1615
0.00
1. 000 1615
0.00
56
1805
0.03
0.188 3.3 8
0.17
67
1900
0.04
0.188 356
0.19
0
1615
0.00
1. 000 1615
0.00
Sum (v/s) critical = 0.52
ost Time/Cycle, L = 0.00 sec Critical v!c(X)
= 0.52
ppr/ Ratios Unf
ane
Del
rp vic g/C d1
LEVEL OF SERVICE WORKSHEET
Prog Lane Incremental Res
Adj Grp Factor Del Del
Fact Cap k
d2
d3
Lane Group Delay LOS
Approach Delay LOS
3.stbound
0.82 0.250 28.3 1. 000 451 0.50 15.7 0.0 44.0 D 0.31 0.375 17.7 1. 000 1354 0.50 0.6 0.0 18.3 B 0.00 1.000 0.0 1. 000 1615 0.50 0.0 0.0 0.0 A 2stbound
0.07 0.250 22.9 1. 000 451 0.50 0.3 0.0 23.2 C 0.55 0.375 19.7 1.000 1354 0.50 1.6 0.0 21. 3 C 0.00 1.000 0.0 1. 000 1615 0.50 0.0 0.0 0.0 A )rthbound
0.30 0.188 28.0 1.000 338 0.50 2.2 0.0 30.2 C 0.28 0.188 27.9 1. 000 356 0.50 2.0 0.0 29.8 C 0.00 1.000 0.0 1. 000 1615 0.50 0.0 0.0 0.0 A mthbound
0.17 0.188 27.3 1.000 338 0.50 1.1 0.0 28.3 C 0.19 0.188 27.4 1.000 356 0.50 1.2 0.0 28.5 C 0.00 1.000 0.0 1.000 1615 0.50 0.0 0.0 0.0 A
30.3 C 21.4 C 30.0 C 28.4 C
Intersection Delay = 26.5 (sec/veh) Intersection LOS = C
"
______________~-------SUPPLEMENTAL PERMITTED LT WORKSHEET
_
for exclusive lefts
APPROACH
EB WB NB SB
'yc Le Length, C 80.0
sec
.ctual Green Time for Lane Group, G
:ffective Green Time, for Lane Group, g
'pposing Effective Green Time, go
[umber of Lanes in Lane Group, N
rumber of Opposing Lanes, No
.djusted Left-Turn Flow Rate, Vlt
'roportionof Left Turns in Opposing Flow, Plto
djust~d Opposing Flow Rate, Vo
lost Time for Lane Group, tl
eft Turns per Cycle: LTC=VltC/3600
pposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
pposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
f=[Gexp(- a * (LTC ** b)))-tl, g~<=g
pposing Queue Ratio: qro=l-Rpo(go/C)
q=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
u =g-gq if gq>=gf, =g-gf ifgq<gf
=(gq-gf)/2, n>=O
tho=l-Plto
1*=Plt[1+{(N-l)g/(gf+gu/Ell+4.24)))
11 (Figure 9-7)
12=(1-Ptho**n)/Plto, E12>=1.0
min=2(1+Plt)/g or fmin=2(1+Pl)/g
diff=max(gq-gf,O)
m=[gf/g)+[gu/g) [1/{1+Pl(Ell-1)})" (min=fmin;max=l.OO)
It=fm=[gf/g)+gdiff[1/{1+Plt(E12-1)}]
[gu/g) [l/(l+Plt(Ell-l)), (min=fmin;max=1.0) or flt=[fm+0.91(N-l))/N**'
fIt
'
Jr special case of single-lane approach opposed by multilane approach, 2e text.
If Pl>=l for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations.
k For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. Jr special case of multilane approach opposed by single-lane approach r when gf>gq, see text.
______________________SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts
APPROACH
EB WB NB
:ycie Length, C 80.0
sec
,ctual Green Time for Lane Group, G
:ffective Green Time for Lane Group, 9
'pposing Effective Green Time, go
rumber of Lanes in Lane Group, N
lumber of Opposing Lanes, No
.djusted Left-Turn Flow Rate, Vlt
'roportionof Left Turns in Lane Group, PIt
roportion of Left Turns in Opposing Flow, Plto
djusted Opposing Flow Rate, VO
ost Time for Lane Group, tl
eft Turns per Cycle: LTC=VltC/3600
pposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
pposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
f=[Gexp(- a * (LTC ** b)))-tl, gf<=g
pposing Queue Ratio: qro=l-Rpo(gb/C)
q=(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
u =g-gq if gq>=gf, =g-gf if gq<gf
=(gq-gf)/2, n>=O
tho=l-plto
1*=Plt[1+{(N-l)g/(gf+gu/Ell+4.24)))
11 (Figure 9-7)
12=(1-Ptho**n)/Plto, E12>=1.0
min=2(1+Plt)/g or fmin=2(1+Pl)/g
diff=max(gq-gf,O)
:n=[gf/g]+[gu/g] [l/{1+Pl(El1-1)}], (rn.ine frn.i n r mexe Lc Un )
It=fm=[gf/g]+gdiff[l/{1+Plt(EI2-1)})
[gu/g] [1/(1+Plt(Ell-1)), (rru ne frru n r maxe Lc O) or flt=[fm+0.91(N-l))/N**
fIt Primary
~_
SB
Jr special case of single-lane approach opposed by multilane approach, ~e text.
If pI>=l for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations. ~ For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. )r special case of multilane approach opposed by single-lane approach ~ when gf>gq, see text.
_____________________ SUPPLEMENTAL UNIFORM DELAY WORKSHEET__------
__
~j. LT Vol from Vol Adjustment Worksheet, v
'/c ratio from Capacity Worksheet, X
'rimary phase effective green, 9
:econdary phase effective gr~en, gq
From Supplemental Permitted LT Worksheet), gu
~ycle length, C 80.0
Red =(C-g-gq-gu), r
.rrivals: v/(3600(rnax(X,1.0))), qa
'rimary ph. departures: s/3600, sp :econdary ph; departures: s(gq+gu)/(gu*3600), ss
.Perm
.Pz o t;
.Ca s e
'ueue at beginning of green arrow, Qa
'ueue at beginning of unsaturated gr~en, Qu
.esidual queue, Qr
rtiform Delay, dl
EBLT WBLT NBLT SBLT
DELAY/LOS WORKSHEET WITH INITIAL QUEUE
ppr/ ane roup
Initial Dur. Unmet Unmet Demand Demand Q veh t hrs.
Uniform Delay
Unadj. Adj.
ds
dl sec
Initial Final
Queue Unmet
Paramo Demand
u
Q veh
Initial La.ne Queue Group Delay Delay d3 sec d sec
astbound
estbound
orthbound
out hbound
Intersection Delay 26.5 sec/veh
Intersection LOS C
_ _ _ _- - - - - - - - - - - - - E R R O R MESSAGES
No errors to report.
-:-
_
HCS: Signals Release 3.1b
nter: CR 68 @ UGR nalyst: ate: 4/13/01 /W St: Union Gr6ve Road
City/St: Proj #: Period: 2025 PM N/S St: CR 68/Belwood/Johnson Lake
J. Lanes 3Config
oLurne
arie Width rOR Vol
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
IL T R IL T R IL T R
I
I
I
I121 I121 I111
I LT
R I LT
R 1 LT
R
1240 670 90 120 380 50 160 60 30
112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0
I
60 I
50 I
20
I Southbound
IL T R
I
I 1 1. 1
I LT R
1100 90 335
112.0 12.0 12.0
I
240
.lration
0.25
Area Type: All other areas
Signal Operations
~ase Combination 1
2
3
4I
5
6
7
8
3 Left Thru Right Peds
3 Left Thru Right Peds
3 Eight 3 Right
P
P
P
P
P
P
P
P
P
P
P
P
I NB Left P
I
Thru
P
I
Right P
P
I
Peds
I SB Left P
I
Thru
P
I
Right P
P
I
Peds
I EB Right P
P
I WB Right P
P
:-een
20.0 30.0
15.0 15.0
=llow
Ll Red
0.0 0.0
0.0 0.0
(cle Length: 80.'0 secs
Intersection Performance Summary
)pr/ Lane
Adj Sat
Ratios
Lane Group Approach
arie
Group
Flow Rate
:-p
Capcity
(s)
vic
g/C
Delay LOS Delay LOS
ss t.bourid
451
1805
1354
3610
1615
1615
ss t.bound
451
1805
1354
3610
1615
1615
srt hbound
338
1805
356
1900
1615
1615
mthbound
338
1805
356
1900
1615
1615
Intersection Delay
0.59 0.55 0.02
0.05 0.31 0.00
0.20 0.19 0.01
0.33 0.28 0.07
= 23.2
0.250 32.0 C .0.375 . 21.3 C
1 ..000 0.0+ A
23.4 C
0.250 23.0 C
0.375 18.3 B
1. 000 0.0
A
18.5 B
0.188 0.188 1.000
28.7 C 28.5, C 0.0+ A
26.5 C
0.188 30.7 C
0.188 29.8 C 20.2 C 1.000 0.1 'A
(sec/veh) Intersection LOS = C
,'-------------------~-------------------
HCS: Signals Release 3.1b
hone:
.Fax:
-Mail: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _OPERATIONAL ANALYSIS
---..:-.
_
ntersection: ity/State: nalyst: r o j-ec t; No: ime Period Analyzed: 3.te: 3.st/West Street Name: orth/South Street Name:
CR 68 @ UGR
2025 PM 4/13/01 Union Grove Road CR 68/Belwood/Johnson Lake
_ _ _ _ _ _ _ _ _~
VOLUME DATA.
_
I Eastbound
I Westbound
Northbound .1 Southbound I
IL T R IL T R
L
T
R IL
T
RI
olume
I-------I---~--- - - - - - - - 1
1240 670 90 120 380 50
60 60 30 /10090
335 II
HF
10.90 0.90 0.90 10.90 0.90 0.90 0.90 0.90 0.90 10.90 0.90 0.90 I
K 15 Vol 167 186 25 16
106 14
17 1 7 8
128 25 93 I
i Ln Vol I
Grade
I
0
I
I
0
o
I
I
101
jeal Sat 11900 1900 1900 11900 1900 1900 1900 1900 1900 11900 1900 1900 I
3.rkExist I
I
umPark
I
I
II
II
Heavy Veh 10
0
0
10
0
0
o o o 10 0 0 1
J. Lanes I 1 2 1 1 1 2 1
111 I111 I
3Config I L T
R I LT
R I L T R 1 L T
R1
3.ne Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 I'
rOR Vol jj Flow
I
60
1267 744 33
I
122
50 422 0
I
167
67
20 11
I
240 I
1111 100 106 I
InSharedLnl
I
I
1
1
rop Turns I
I II
1
umPeds urnBus
1
I0 - 0
o o
I I0
o
o o
I
10
oI
o .0
I0
0 00
1
I
.lration 0.25
Area Type: All other areas
_ _ _ _ _ _ _ _ _ _ _ _ _ _OPERATING PARAMETERS
_
I Eastbound . I Westbound
1L
T
R IL
T
R
1-------I
nit Unrnet 10.0 0.0 0.0 10.0 0.0 0.0
rriv. Typel3
3
3
13
3
3
ni tExt. , I3 . 0 3.0 3.0 13.0 3.0 3.0
Factor 1
1. 000
1
1. 000
ost Time 12.0 2.0 2.0 12.0 2.0 2.0
xt of g 12.0 2.0' 2.0 12.0 2.0 2.0
ed Min g I
0.0
1
0.0
I Northbound
IL T R I
10.0 0.0 0.0
13
3
3
13.0 3.0 3.0
I
1.000
12.0 2.0 2.0
12.0 2.0 2.0
I
0.0
I Southbound
IL T R
I
10.0 0.0 0.0
13 3 3
13.0 3.0 3.0
I
1. 000
/2.0 2.0 2.0
12.0 2.0 2.0
I
0.0
PHASE DATA
hase Combination 1
2
3
41
5
6
7
8
B Left . Thru Right Peds
P
P
P
P
NB ' Left P
Thru
P
Right P
P
Peds
B Left Thru Right Peds
P
P
P
P
SB Left P
Thru
P
Right P
P
Peds
B Right
P
P
EB Right P
P
B Right
P
P
WB Right P
P
reen ellow 11 Red
20.0 30.0 0.0 0.0
ycle Length: 80.0 secs
15.0 15.0 0.0 0.0
;
VOLUME ADJUSTMENT WORKSHEET
ppr. /
Mvt
ovement Volume PHF
Adjusted Prop. Prop.
Flow No. Lane
Flow Rate Left Right
Rate. Lanes Group RTOR In Lane Grp Turns Turns
astbound
Le.ft
240
0.90 267
1
L
267
Thru
670
0.90 744
2
T
744
Right 90
0.90 33
1
R
60
33
estbound
Left 20
0.90 22
1
L
22
Thru
380 . 0.90 422
2
T
422
Right 50
0.90 a
1
R
50
a
orthbound
Left
60
0.90 67
1L
67
Thru 60
0.90 67
1T
67
Right 30
0.90 11
1
R
20
11
outhbound
Left
100
0.90 111
1
L
111
Thru
90 .
0.90 100
1
T
100
Right 335
0.90 106
1
R
240
106
Value entered by user.
SATURATION FLOW ADJUSTMENT WORKSHEET
ppr/ Ideal
Adj
ane Sat f
f
f
f
f
f
f
f
f
Sat
roup Flow W
HV
G
P
BB
A
LU RT
LT
Flow
astbound 1900 1900 1900
1.000 1. 000 1.000
1.000 1.000 1.000
1.000 1.000 1. 000
1.000 1.'000
1.000
Sec LT Adj/LT Sat: 1. 000 1. 00 1. 00 1.000 1. 00 0.95 1.000 1.000 1. 00 1. 00 0.850
0.950 1.000
1805 3610 1615
estbound 1900 1900 1900
1. 000 1.000 1.000
1.000 1.000 1.000
1. 000 1. 000 1. 000
1.000 1. 000 1.000
Sec LT Adj/LT Sat: 1. 000 1. 00 1. 00 1.000 1. 00 0.95 1.000 1. 000 1. 00 1. 00 0.850
0.950 1. 000
1805 3610 1615
orthbound 1900 1900 1900
1.000 1. 000 1.000
1.000 1.000 1.000
1.000 1. 000 1.000
1.000 1.000 1.000
Sec LT Adj/LT Sat: 1. 000 1. 00 1. 00 1.000 1. 00 1. 00 1.000 1.000 1. 00 1. 00 0.850
0.950 1. 000
1805 1900 1615
outhbound 1900 1900 1900
1.000 1.000 1.000
1.000 1.000 1.000
1.000 1.000 1. 000
1.000 1.000 1.000
Sec LT Adj/LT Sat: 1.000 1. 00 1. 00 1.000 1. 00 1. 00 1.000 1.000 1. 00 1. 00 0.850
0.950 1.000
1805 1900 1615
.....
Appr/ Lane Mvmt Group
Adj Flow Rate
(v)
astbound Pri. Sec. Left L Thru T Right R
estbound Pri. Sec. Left L Thru T Right R
orthbound Pri. Sec. Left L Thru T Right R
:luthbound Pri. Sec. Left L Thru T Right R
267
1805
# 0.15
0.250 451
744
3610
# 0.21
0.375 1354
33
1615
0.02
1. 000 1615
22
1805
0.01
0.250 451
422
3610
0.12
0.375 1354
o
1615
0.00
1. 000 1615
67
1805
0.04
0.188 338
67
1900
0.04
0.188 356
11
1615
0.01
1. 000 1615
111
1805
#0.06
0.188 338
100
1900
# 0.05
0.188 356
106
1615
0.07
1.000 1615
Sum (v/s) critical = 0.47
:>st Time/Cycle, L = 0.00 sec Critical v/c(X)
= 0.47
0.59 0.55 0.02
0 ..05 0.31 0.00
0.20 0.19 0.01
0.33 0.28 0.07
;::>pr/ Ratios Dnf
arie
Del
r-p vic . g/C .d1
SERVICE WORKSHEET
Incremental Res
Factor Del Del
k
d2
d3
Lane Group Delay LOS
_ Approach
Delay LOS
:tstbound
0.59 0.250 26.4 1. 000 451 0.50 5.6 0.0 32.0 C
0.55 0.375 19.7 1. 000 1354 0.50 1.6 0.0 21.3 C
0.02 1.000 0.0 1.000 1615 0.50 0.0 0.0 0.0+ A
~stbound
0.05 0.250 22.8 1.000 451 0.50 0.2 0.0 23.0 C
0.31 0~375 17.7 1.000 1354 0.50 0.6 0.0 18.3 B
0.00 1. 000 o. a 1. 000 1615 0.50 0.0 0.0 0.0
A
)rthbound
.0.20 0.188 27.4 1.000 338 0.50 1.3 0.0 28.7 C
0.19 0.188 27.4 1.000 356 0.50 1.2 0.0 28.5 C
0.01 1.000 0.0 1.000 1615 0.50 0.0 0.0 0.0+ A
)uthbound'
0.33 0.18'8 28.1 1.000 33.8 0.50 2.6 0.0 30.7 C
0.28 0.188 27.9 1.000 356 0.50 2.0 0.0 29.8 C
0.07 1'.000 0.0 1.000 1615' 0.50 0.1 0.0 0.1
A
23.4 C 18.5 B 26.5 C 20.2 C
Intersection Delay = 23.2 (sec/veh) Intersection LOS = C
_______________________SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts
APPROACH
EB WB NB
ycle Length, C 80.0
sec
2tual Green Time for Lane Group, G
ffective Green Time for Lane Group, 9
pposing Effective Green Time, go
umber of Lanes in Lane Group, N
umber of Opposing Lanes, No
jjusted Left-Turn Flow Rate, Vlt
Loportion of Left Turns in Opposing Flow, plto
jjusted Opposing Flow Rate, Vo
Jst Time for Lane Group, tl
2ft
Turns .per Cycle:
LTC=VltC/3600 \
pposing Flow per Lane, Per Cycle: Volc=VoC/3600fluo.
pposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
f=[Gexp(- a * (LTC ** b)))-tl, gf<=g
pposing Queue Ratio: qro=l-Rpo(go/C)
~=(4.943Volc**0.762)(qro**1.061)-tl, gq<=g
J =g-gq if gq>=gf, =g-gf if gq<gf
=(gq-gf)/2, n>=O
tho=l-Plto
l*=Plt[l+{ (N-1)g/(gf+gu/El1+4.24)))
II (Figure 9-7)
l2=(1-Ftho**n)/Plto, E12>=1.0
nin=2(1+Plt)/g or fmin=2(1+Pl)/g
jiff=max(gq-gf/O)
n=[gf/g]+[gu/g] [l/{1+Pl(El1-1)}], (min=fmin;max=1.00)
Lt=fm=[gf/g]+gdiff[l/{1+Plt(E12-1)})
[gu/g] [l/(1+Plt(El1-1)), (min=fmin;max=l.O) or flt=[fm+0.91(N-l))/N**
fIt
_ SB
)r special case of single-lane approach opposed by multilane approach,
"e text.
If Pl>=l for shared left-turn lanes with N>l, then assume de-facto
left-turn lane and redo calculations.
~ For permitted left-turns with multiple exclusive left-turn lanes, flt=fm.
)r special case of multilane approach opposed by single-lane approach
~ when gf>gq, see text.
.
________~
SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts
APPROACH
EB WB NB
{cle Length, C 80.0
sec
:tual Green Time for Lane Group, G
Efective Green Time for Lane Group, 9
)posing Effective Green Time, go
1mber of Lanes in Lane Group, N
1mberof Opposing Lanes, No
ljusted Left-Turn Flow Rate, Vlt
coportion of Left Turns in Lane Group, PIt
coportion of Left Turns in Opposing Flow, plto
ljusted Opposing Flow Rate, Vo
)st Time for Lane Group, tl
~ft Turns per Cycle; LTC=VltC/3600
)posing Flow per Lane, Per Cycle: Volc=VoC/3600fluo
)posing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7)
E=[Gexp(- a * (LTC ** b))]-tl, gf<=g
)posing Queue Ratio: qro=I-Rpo(go/C)
F(4.943Volc**0.762) (qro**1.061)-tl, gq<=g
1 =g-gq if gq>=gf, =g-gf if gq<gf
=(gq-gf)/2, n>=O
::ho=l-Plto
L*=Plt[1+{(N-1)g/(gf+gu/El1+4.24)))
L1 (Fi gu r e 9 - 7 )
L2=(1-Ptho**n)/Plto, E12>=1.0
nin=2(I+Plt)/g or fmin=2(1+Pl)/g
liff=max(gq-gf,O)
n= [gf/g] + [gu/g] [11 {1+Pl (Ell-I)}], (min=fmin;max=1.00)
Lt=fm=[gf/g]+gdiff[I/{1+Plt(E12-1)}]
[gu/g] [II (I+Plt(Ell-l)], (min=fmin;max=I.0) or flt=[fm+0.91.(N-l)] IN**
fIt Primary
__ SB
)r special case of single-lane approach opposed by multilane approach, ~e text.
If pI>=l for shared left-turn lanes with N>I, then assume de-facto left-turn lane and redo calculations.
k For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. )r special case of multilane approach opposed by single-lane approach c when gf>gq, see text.
______________________ SUPPLEMENTAL UNIFORM DELAY WORKSHEET
__
dj. LT Vol from Vol Adjustment Worksheet, v
/c ratio from Capacity Worksheet, X
rimary phase effective green, g
econdary phase effective green, gq
From Supplemental Permitted LT Worksheet), gu
ycle length, C 80.0
Red =(C-g-gq-gu) , r
rrivals: v/(3600(max(X,1.0))), qa
rimary ph. departures: s/3600, sp
econdary ph. departures: s(gq+gu)/(gu*3600), ss
Perm
Prot
Case
ueue at beginning of green arrow, Qa
ueue at beginning of unsaturated green, Qu
esidual queue, Qr
niform Delay, dl
EBLT WBLT NBLT SBLT
DELAY/LOS WORKSHEET WITH INITIAL QUEUE
ppr/ ane roup
Initial Dur. Unmet Unmet Demand Demand Q veh ... t hrs.
astbound
Uniform Delay
Unadj. Adj.
ds
dl sec
Initial Final
Queue Unmet
Paramo Demand
u
Q veh
Initial Lane Queue Group Delay Delay d3 sec d sec
estbound
orthbound
outhbound
Intersection Delay 23.2 sec/veh
Intersection LOS C
_________________ERROR MESSAGES
_
No errors to report.