Fiscal Years 1995 1996 1997
INTRODUCTION
The Statewide Transportation Improvement Program (STIP) is
l
developed to comply with the provisions of the Intermodal
Surface Transportation Efficiency Act of 1991 (ISTEA). The STIP
contains Federal Aid projects programmed for Fiscal Years 1995,
i ~
1996 and 1997. The projects have been identified through the planning process and represent transportation needs statewide.
~
t
The STIP includes Highway and Bridge, Bicycle, Pedestrian, Transportation Enhancement, and Public Transportation (transit)
projects. Phases of projects, also referred to as project-
' ~
it-
related activities, such as PE (Preliminary Engineering), ROW (Right of Way) and CONST (Construction) are given for highways, and capital and operating for-transit. The projects are
F .
1
organized by County and by mode of transportation. The STIP format has been standardized with the same information for each
2.
project.
. I
l
~
The STIP is a federal requirement for receipt of Federal Highway Administration and Federal Transit Administration funds. The STIP must be fiscally balanced. Projects and phases of projects
listed may only include those for which there is funding
;,i:.-
available or for which there is a reasonable expectation of
[
obtaining funds. Federal funds for Fiscal Years 1995, 1996 and
1997 are program estimates and will not be final until after the
federal budget is approved by October 1 of each year.
r
The Statewide Transportation Improvement Program places emphasis
on maintaining and improving the existing highways, bridges, and
I
public transportation equipment. The public transportation program expenditures focuses on replacement of vehicles and
other operating equipment as a means of improving public transit
!
operations, safety, and meeting the requirements of the Americans with Disabilities Act.
The Georgia Department of Transportation is pleased to make this
~
document available. We welcome any comments on the STIP; please send your comments to:
~
Georgia Department of Transportation Office of Planning
No. 2 Capitol Square
Atlanta, Georgia 30334
~
At_t: Marta V. Rosen
( 404) 656-5725
~ !
i
I
'4
GLOSSARY OF ACRONYMS AND ABBREVIATIONS
FUND SOURCE:
CATEGORIES OF FEDERAL HIGHWAY ACT (FHWA) FUNDING
CONG MIT./AIR QUAL - Congestion Mitigation/ Air Quality FED. LANDS - Federal Lands HWY. SAFETY - Highway Safety I-STATE MAINT. - Interstate Maintenance I-STATE CONST. - Interstate Construction NAT'L HIGHWAY - National Highway System OLD URBAN SYSTEM - funds allocated to Georgia before ISTEA SURFACE TRANSPORT. - Surface Transportation Program TRANS. ENHANCE. - Transportation Enhancement Assistance
CATEGORIES OF FEDERAL TRANSIT ACT (FTA) FUNDING
URBAN TRANSIT DISC. - Discretionary assistance awarded on a competitive basis by the FTA; ADA or CAA indicates Americans with Disabilities Act project or Clean Air Act project. URBAN TRANSIT - Urban Area assistance - can be capital or operating funds; ADA or CAA indicates Americans with Disabilities Act project or Clean Air Act project. ELDERLY & DISABLED - Assistance for Elderly and Handicapped capital projects. RURAL TRANSIT - Rural Area assistance - can be capital or operating funds.
OTHER ACRONYMS/ ABBREVIATIONS
1
BR - Bridge
CONG DIST. - Congressional District
CONST - Construction
CS - City Street
CR - County Road
CWP - Construction Work Program. The
Construction Work Program includes projects in
two phases 'Phase I (first three years of the
Program) and Phase II (next three years of the
Program). The STIP is derived from Phase I
projects.
FED SHARE - Federal Share of the cost of the
project
FM - Indicates "from"
GA. SHARE - Georgia Share of the cost of the
project
HOV LANES - High Occupancy Vehicle lanes;
designated lanes used exclusively for
multiple-occupancy vehicles.
INT - Intersection, usually seen as "Smith Road
Int Jones Street".
LGPA - Local Government Project Agreement. These
agreements outline highway and bridge project
responsibilities between the GDOT and the local
government. The status line will indicate if an
agreement has been requested, signed or refused
(a signed or refused agreement would have the
date of the transaction noted on the project
description). Most LGPA address sharing
responsibilities for right of way, utilities or
detours.
LOC SHARE - Local Share of the cost of the
project
N, S, E, W - North, South, East, West. May
also be used in combinations of NE, SW etc.
L
NB, SB, EB, WB - North Bound, South Bound, East Bound, West Bound - indicating direction of
movement. Sometimes will be shown as NBL, SBL,
EBL or WBL to indicate North Bound Lane, South
Bound Lane, East Bound Lane or West Bound Lane.
B OR BU OR BUS - Business Route
BYP - Bypass or Circumferential Route
L
CONN - Connector EXT - Extension
FRNTG - Frontage
NOISE BARR. - Noise Barrier
t I
PE - Preliminary Engineering indicates an early
phase of project development that may include
surveys, design, environmental and other work
done in project development.
P.I. NO. - Program Item Number is unique to each
project.
PKWY - Pa-rkway
RECST. OR REHAB. - Reconstruction or
Rehabilitation
RTL OR LTL - Right Turn Lane or Left Turn Lane
R/W or ROW - Right of Way
SR - State Route
T&S PROJECT - Traffic and Safety Project
TIP - Transportation Improvement Program
developed by the Metropolitan Planning
Organizations
UTL OR UTIL - Utilities
r=
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 1
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
---
-
-
-
-
-
-
PROJECT
- .-
DATA
-
------ -
-
COMMENTS
-------------------
---------------------------Y-EA--R --------E-S-T-S
.-
ALL
LUMP SUM MAINT, FOR INTERSTATE MAINTENANCE "04M" FOR FY 97
PE NONE
$
0
04M097 MINOR WIDEN & RESURF / MAINTENANCE
CONG DIST. 99
ROW NONE
$
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1997
$ 27778
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 25000
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 2778
0TH SHARE $
ALL 04MB95
STATUS:
LUMP SUM BRIDGE PAINTING "04M" FOR FY 95 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 2000
1800 .200
ALL 04MB96
STATUS:
LUMP SUM BRIDGE PAINTING "04M" FOR FY 96 BRIDGES./ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1996 $
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 22000 19800 2200
ALL 04MB97
STATUS:
LUMP SUM BRIDGE PAINTING "04M" FOR FY 97 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
, _ROW NONE $
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 4444 4000
444
~
m::;i:mo
~-~
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 1
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
----------------------------------------------------------------------------------------------------------------------------------
BANKS
I-85 SIGN MOD FM DEK CL
PE NONE
$
0
11044Y SIGNING/ MAINTENANCE
CONG DIST. 10 & 6
ROW NONE
$
0
PROJE.CT MILEAGE : 76. 00 - EXIST. LANES:
CONST 1995
$
0
MANAGER: L. SEABROOK
FUND SOURCE: I-STATE MAINT.
FED SHARE$
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
110440 IS AN ASSOCIATED PROJECT.
0TH SHARE$
BANKS 1B1004
STATUS:
COUNTY OPERATED PUBLIC TRANSIT FACILITIES/ FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1995
$
22
FUND SOURCE: RURAL TRANSIT
FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
9
BANKS 1Bl005
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH
CONG DIST. 10
OPERATING 1996
$
24
FUND SOURCE: RURAL TRANSIT
FED SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
10
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BARROW 11044X
STATUS:
I-85 SIGN MOD FM DEK CL TO SC STATE LN.\~ACK/BANKS/GWN/FRANK SIGNING/ MAINTENANCE PROJECT MILEAGE : 76.00 - EXIST. LANES: )/fROPOSED LANES: 0 MANAGER: L. SEABROOK
CONG DIST. 10 & 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 110440 IS AN ASSOCIATED PROJECT.
BARROW 121730
STATUS:.
WINDER BYP FM SR 8 @ SR 11 NEAR :\8Mi( TO SR 53 @ $R 11
CONSTRUCTION OF NEW ROUTE WITH4::fhli\i!s PROPOSED.
PROJECT MILEAGE: 2.60 MANAGER: J. GRAYBEAL (M)
SEND LGPA IN 1997
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
BARROW , 132220
:ci!;T:.~:.i~'{~,iii!iff:.~!1~ ,!;e~'~g~T~.:Jlf 22O
PROJECT MILEAGE : 1.26
MANAGER: L. OWENS
STATUS: BARROW SGN 11-16-93 FOR
BARROW 170728
STATUS:
i 1
CR 72/BROWNS BRIDGE RD @ APALACHEE RIVER SW :F AUBp@jli REPLACEMENT OF THE EXISTING BRIDGES (S). FROM 1 TO 2::~ES. PROJECT MILEAGE : .20
;~!ijfil4 =~!R~G~-D~~~:, UTILITIES & DETOURS ll/~}j
NO UTIL
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
DIST. 10 FUND SOURCE: BRIDGE PROGRAM
HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 2
FISCAL YEAR
COST ESTS
PE NONE $
0
ROW NONE $
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
PE ROW LOCL CONST
$ 187 AFTER 97
PE 1992 UNDERWAY
ROW 1995 $ 110
CONST 1996 $ 725
FED SHARE $ 580
GA. SHARE $
145
0TH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1996 $ 200
FED SHARE$ 160
GA. SHARE$
40
0TH SHARE$
=
~
"
COUNTY P.LNO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CLARKE 12],990
STATUS:
PRINCE AVE FM S/SR 8 TO 600' N/CSX RR INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .58 - EXIST. LANES: MANAGER: L. OWENS CO SGN 10-4-91 PUB UTIL;T&S REQ ROW,
JEFFERSON ST
8
ATHENS TIP i II-01
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122350 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 3
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1994
UNDERWAY
CONST 1995 $ 2797
FED SHARE $ 2238
GA. SHARE $ 559
0TH SHARE $
CLARKE 122350
STATUS:
SR 15/PRINCE AVE/N ATHENS REHAB. OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: L. OWENS _CLARKE SGN 10-4-91 FOR
ATHENS TIP i II-02 CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 121990 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1995
$
350
FED SHARE $ 280
GA. SHARE $
70
0TH SHARE $
CLARKE 12257Z
STATUS:
SR 10/US 78 MONROE UNKNOWN/ UNKNOWN PROJECT MILEAGE: MANAGER: UNKNOWN
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
0
ROW NONE $
0
CONST 1997 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
CLARKE 122600
STATUS:
SR lOLP/ATHENS BYPASS RAMP/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: L. OWENS (M) SEND LGPA IN 199
}ATHENS TIP i III-05 /:/=coNG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 $
10
ROW 1996 $
10
CONST 1997
$
393
FED SHARE$
393
GA. SHARE$
0TH SHARE$
CLARKE 122680
STATUS:
SR 8/US 78@ HUNTINGTON RD AND ATHENS BYPASS INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : 53 - EXIST, LANES: 0 /PROPOSED LANES { MANAGER: L. OWENS REQ CLARKE DO UTILITIES 8-11-93 (CO REQ PLANS 12-6-93)
~=b iB#~Bf; t< : }coNG Disflfio FEDERAL'',1HGHWANYATA'D.;MHINIG: ?EW:'.V~NXPS
PE 1994
UNDERWAY
ROW 1995
$
150
CONST 1995
$
450
FED SHARE $
450
GA. SHARE $
. 0TH SHARE $
CLARKE 15021Y
STATUS:
CR 473/EPPS BR RD FM SR 10/0CONEE TO US 78 .. SEE OCONEE RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .00 MANAGER: .UNKNOWN
PE 1993
U!JDERWAY
ROW NONE
$
0
l~ii~itil~t:~~r~:~~~[~~ii
:
~;: ~~:! /CONST 1996
$ $ $ $
0
CLARKE 170920
STATUS:
UNIVERSITY OF GEORGIA EAST CAMPUS MULTI-USE TRAIL IN ATHENS BICYCLE/PED. FACILITY / ENHANCEMENT PROJECT MILEAGE : .00 EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: CHRIS SIMONS TO BE DONE BY CONTRACT
PE 1995 $
49
ROW LOCL
CONST 1995
$
316
FED SHARE $
253
GA. SHARE $
10
0TH SHARE $
73
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CLARKE 170923
STATUS:
HERITAGE TRAIL ALONG THE OCONEE RIVER Il't ATHENS BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /~0POSED LANES: 0 MANAGER: CHRIS SIMONS TO BE DONE BY CONTRACT
CONG DIST. 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
CLARKE 170925
STATUS:
~ ~~~5~H\o l b : o BIKEWAY/LANDSCAPING ON EPPS BRIDriii rt6fuf IN ATHENS
:!g~~~/:~~EA~!c;L~~~
/PROPOSED
MANAGER: B FERGUSON
TO BE DONE BY CONTRACT
ATHENS TIP t V-01
CONG DIST: 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
CLARKE 170926:
STATUS:
COLLEGE STATION RD BIKF; 4ful.IL IN ATHENS
~ :!g~~~/:~~EA~!c;L~~~ f~j~;E~is :" o /PRoPo~t,::l!fflf~: o
MANAGER: CHRIS SIMONS TO BE DON~ BY CONTRACT
CONG_DIST. 10_
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
CLARKE _170960
~TATUS:
CLARKE 170970
STATUS:
LUMPKIN ST/ BAXTER ST SIGNAL
: it !!g~; 'I-~~~iy: 00 - EXIST. LANES: 0 /PROPOSEP.
0
{isl: =:~:~~~ ~!~~i!D GOVERNMENT SGN 12-2h93/
~;GNALS
ATHENS CBD SIGNAL SYSTEM SIGNALS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED MANAGER: BURT RIDDLE . CONTACT TRAFFIC OPERATIONS
:.::\i{':':}ATHENS TIP t III-02
:(ioNG DIST. 10
FUND SOURCE': HWY; SAFETY
::i # FEDERAL HIGHWAY ADMIN FUNDS
. :::::=~S
III-04
//CONG DIST} fo
FUN;Jipltf: HWY ,/SAFETy;)ii= FEDERAL 'HIGHWAY ADMIN.::FUNbS
CLARKE 170980
STATUS:
REALIGNMENT OF RIVERBEND RD FM MINOR WIDEN & RESURF /. SAFETY PROJECT.MILEAGE : 1:46 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: L. OWENS (C) REV REQ ATHENS/CLAREK DO ROW, UTILITIES AND PE 2~8-94 OTO
k~f' <<';ttb souRcif
~AFETY
FEDERAL :!il:GHWAY ADMIN
CLARKE lDlOll
STATUS:
VEHICLES, CAP. MAINT., REPAIRS, TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT
MANAGER: STEVE KISH LGPA NOT APPLICABLE
SIGNS, POLES, SYSTEM
SHELTERS,
ETC.
CONG DIST. \10
FUND SOURCE: FEDERAL TRANSIT
22-Feb-1994 Page 4
FISCAL YEAR
COST ESTS
PE 1996 $
36
ROW Loci.
CONST.. 1996 "$
235
FED SHARE$ 188
GA. SHARE$
7
0TH SHARE$
54
PE LOCL
ROW LOCL
CONST i995
$
675
FED SHARE$ 540
GA. SHARE$
0TH SHARE$
135
PE 1996 .$
20
ROW 1996 $
16
CONST 1996 .$ 214
.FED. SHARE'$
171
GA. SHARE$
7
0TH SHARE$
50
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
.105 _95
- 11
PE NONE $
0
ROW NONE $
0
CONST 1996 $ 220
FED _SHARE $ 198
GA. SHARE$
22
0TH SHARE$
PE LOCL ROW Loci
1995 $ FED SHARE$ GA, SHARE$
0TH SHARE$
270 243
27
1995
$ 357
. FED SHARE $ 286
GA. SHARE$
36
0TH SHARE$
36
,-
l!!!!!!!!!e
lffll!!!!l!I
-
' .......,
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 5
FISCAL YEAR
COST ESTS
CLARKE 1Dl012
STATUS:
VEHICLES, CAP. MAINT., SHELTERS, BUS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE
POLES, ETC.
CONG DIST. 10
CAPITAL 1996
$
425
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $ 340
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
43
0TH SHARE $
43
CLARKE 1Dl014
STATUS:
ADA EQUIPMENT FOR BUSES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 10
CAPITAL 1995
$
11
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
10
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
1
0TH SHARE $
1
CLARKE 1Dl017
STATUS:
PUBLIC TRANSIT TRANSIT PROJECTS FUNDS RECIPIENT: ATHENS MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1995 $ FED SHARE $ GA. SHARE $
0TH SHARE $
1100 550
550
CLARKE 1Dl018
STATUS:
PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996 $ FED SHARE $ GA. SHARE $ 0TH SHARE $
1300 364
1 937
CLARKE lVlOll
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA MANAGER: STEVE KISH
DIST:; \fo
FUNo]ip~tf = ELDERLY , FEDl!JRAtt:-'l'RANSIT ADMIN
CAPITAL 1995
$
15
FUND FED SHARE$
12
GA. SHARE$
2
0TH SHARE$
2
CLARKE 1Vl012
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA MANAGER: STEVE KISH
DIST. 19)(
'ittb souRcir'ELbERLY &
FED:E:RAL_,,'rruui$:i:T ADMIN
1996
$
16
FED SHARE$
13
GA. SHARE$
1
0TH SHARE$
2
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DAWSON 122040
sTATUS:
SR 9 FM SR 53 TO NEAR CR
TURN LANES/ SAFETY PROJECT MILEAGE : 1.00 MANAGER: L. OWENS (M) CITY DAWSWONVILLE SGN 12/8/89 ROW &
cs 501 3
CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 6
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW LOCL
CONST 1997
$
678
FED SHARE$
610
GA. SHARE$
68
0TH SHARE$
==
~
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DEKALB 12236X
STATUS:
SR 124 CONN/SR 890 FM ST MTN FWY TO SR UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: BILL MOSKAL
GWINNETT 0
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122360 IS AN ASSOCIATED PROJECT,
22-Feb-1994 Page 7
FISCAL YEAR
COST ESTS
PE ROW CONST
$
0
AFTER 97
AFTER 97
COUNTY P.I.NO.
DESCRIPTION PROJECT DJ\TA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 8
FISCAL YEAR
COST ESTS
ELBERT 12264X
STATUS:
SR 72 FM W OF FORK CK TOE OF BROAD RIVER/SEE MADISON
UNKNOWN / UNKNOWN
- -
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 )ifa,()POSED LANES: 0
MANAGER:
PE 1994
CONG DIST. 10
ROW 1997
GRIP PROJECT
CONST
FOND SOURCE: GOVERNOR'S RO IMP PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
UNDERWAY
$
0
AFTER 97
ELBERT 170990
CR 168/GOss ROAD @ souTH BEAVERDi$i:BI~{ NW OF EiifikToN REPLACEMENT OF THE .EXISTING BRti:ii;tjl{sj . NO ADDED LANES. PROJECT MILEAGE : .20
STATUS: ~:~~R~I~NEg~~!, UTILI-::T_.::::;i.._f.;:g-.:--:J)bi~OURS 10-12-93
ELBERT 170991
STATUS:
CR 183/CO~OWATER P~~!~j~~RO@ GUM LOG BRANCH
REPLACEMENT OF THE EXISiffiiG BRIDGES(S). NO ADDED
PROJECT MILEAGE : 19 '\/):
MANAGER: L. OWENS
\} '
ELBERT SGN DO ROW, UTILITIES h'h:iETOURS
ELBERT 1B1009
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH
ELBERT 1B1010
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FONDS RECIPIENT: ELBERT MANAGER: STEVE KISH
ELBERT 1C2009
STATUS:
ONE STANDARD VAN ANO ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH LGPA NOT APPLICABLE
ELBERT 1C2010
STATUS:
ONE STANDARD VAN ANO ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS_ RECIPIENT: ELBERT MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 10 FOND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS
PE 1994
UNDERWAY
ROW LOCL
CONST 1996 $ 282
FED SHARE$ 226
GA. SHARE$
56
0TH SHARE"$
PE 1994 UNDERWAY
ROW LOCL
CONST 1996 $ 173
FED SHARE$
138
GA. SHARE$
35
0TH SHARE$
DIST. 10
OPERATING 1995 $
82
FOND SOURCE: RURAL TRANSIT
FED SHARE$
48
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
34
\~Q~G DI~":r)(10
FONo:l6W2i:
RURAL
TRANsif
A
,,
9 OPERATrn~E~ ~!ARE
:
87 51
FEDt~::TRANSIT AbMINFUNDS
GA. SHARE$
0TH SHARE$
36
t:{Bb~G
::iJJ; -SOURCE( RURAL TRANSIT
,fruilisIT FEDERAL ---, ....-, ..,
.
ADMIN
1995
$
21
FED SHARE $.
17
GA. SHARE$
2
0TH SHARE$
2
FOND SOURCE: FEDERAL TRANSIT
CAPITAL 1996
$
21
FED SHARE$
17
GA. SHARE$
2
0TH SHARE$
2
"""""""' """""""' """""""' =
~
1--.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FORSYTH 122012
STATUS:
SR 369@ CHATT'CHEE RVR/L LANIER(NEW PAllll:LLEL BR] . HALL
REHAB. OF THE EXISTING BRIDGE(S). FROM .2\I.ANES TO 4 LANES.
PROJECT MILEAGE : . 00
......
MANAGER: B FERGUSON (M)
HALL SGN 5-13-91 AND FORSYTH SGN 8-26-,91 f6itittTILITIES.
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 122015 IS AN ASSOCIATED PROJECT.
FORSYTH 122390
STATUS:
sR 306 EXT FM sR 20 EAST To sR 9h!i#:6c;ExisT Lod \.() sR 400
CONSTRUCTION OF NEW ROUTE WITH/4:tfiliii:'s PROPOSED.
PROJECT MILEAGE ; 4.90
MANAGER: B FERGUSON (M)
SEND LGPA WHEN PROJECT IS
TO CWP
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
FORSYTH 122550
STATUS:
;;v SR 9 AT SR 20 SOUTH dJ~ING
INTERSECTION IMPROVEMENT// SAFETY
.
PROJECT MILEAGE : 00 - E#ST . LANES: 0 /PROPO$iili:5: ~ i s : 0
MANAGER: B FERGUSON
CONTACT TRAFFIC OPERATIONS
CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
FORSYTH 132390
STATUS:
SR 306 AT SR 369 INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .53 - EXIST. LANES:
MANAGER: L. OWENS COUNTY SGN 12-14-92 FOR UTILITIES
FUND SOURCE: HWY. SAFETY FE--D: E..R..A...L.. . HIGHWAY ADMIN FUNDS
FORSYTH 132510
STATUS:
SR 53 AT CR 226/CRYSTAL COVE-WESTBROOK ROADS INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : . 00 - EXIST. LANES: 2 /PROPOSED
MANAGER: L. OWENS(M) SEND LGPA IN 199
FORSYTH 141605
STATUS:
SR 20/SR 9/CUMMING@ CS 526; & CR 87
INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS
COUNTY REFUSED DUE TO COST 9-15-93
OTO PROJECT.
*~~i ::::~ti~Jl!~:::,lf, FEDERAL HIGHWAY
FORSYTH 141940
STATUS:
SR 306 AT CR 201/BETTIS TRIBBLE GAP RD IN CUMMING INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: L. OWENS SEND LGPA IN 199
CONG :~:,~9
FUND SOURCE: HWY FEDERAL HIGHWAY
22-Feb-1994 Page 9
FISCAL -YEAR
COST ESTS
PE ROW NONE CONST
$
75
$
0
AFTER 97
PE
ROW CONST
$ 158
AFTER 97 AFTER 97
PE NONE $
0
ROW 1995 $ 100
CONST 1996 $ 400
FED SHARE$ 360
GA. SHARE$
40
0TH SHARE$
PE 1994 UNDERWAY
ROW 1995
$
4
CONST 1996 $ 310
FED SHARE $ 279
GA. SHARE $
31
0TH SHARE $
PE NONE ROW 1997 CONST
$
0
$
30
AFTER 97
PE NONE
$
0
ROW LOCL
1997
$
385
FED SHARE $ 347
GA. SHARE $
39
0TH SHARE $
PE NONE
$
0
ROW 1995
$
23
CONST 1996
$
129
FED SHARE $
116
GA. SHARE $
13
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION .IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FORSYTH. SR 400@ MCFARLAND, SR 141, SR 171120_ SIGNALS/ SAFETY
PROJECT MILEAGE_: .00 - EXIST. LANES: MANAGER: BURT.RIDDLE
STATUS: FORSYTH COUNTY SIGNED FOR UTILITIES
SR 20@
CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 10
FISCAL YEAR
COST ESTS
PE 1994
$
8
ROW NONE
$
0
CONST 1995
$
420
FED SHARE$
378
GA. SHARE$
'42
0TH SHARE$
FORSYTH 171140
STATUS:
POOLE'S MILL COVERED BR BRIDGES / ENHANCEMENT_
PROJECT MILEAGE : . oo
MANAGER: . UNKNOWN DOT WILL PROVIDE THE
CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1995, $
FED SHARE$ GA. SHARE $
0TH S_HARE $
0
0. 132 106
26
FORSYTH 1B1014
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995 $
53
FUND SOURCE: RURAL TRANSIT
FED SHARE$
31
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
22
FORSYTH 1Bl015
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FORSYTH MANAGER: -.STEVE KI SH
DIST. 9 RURAL TRANSIT
-OPERATING 1996 . $
56
FED SHARE$
33
GA. SHARE $
0TH SHARE$
23
FORSYTH 1C2014.
STATUS:
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH LGPA NOT APPLICABLE
1995
$
21
FED SHARE$
17
GA. SHARE $
2
0TH SHARE$
2
~
,,
COUNTY P.I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FRANKLIN I-85 SIGN MOD FM DEK CL 11044W SIGNING/ MAINTENANCE
PROJECT MILEAGE : 76,00 - EXIST. LANES: MANAGER: L. SEABROOK STATUS:
CONG DIST. 10 & 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 110440 IS AN ASSOCIATED PROJECT.
FRANKLIN I-85 UPGRADE NB REST 110460 REST AREA/ RECST, OR
PROJECT MILEAGE : .00 MANAGER: J. GARLAND STATUS: NOT APPLICABLE
CONG DIST. 10 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
FRANKLIN I-85 SB WELCOME 110510 REST AREA/ RECST, OR
PROJECT MILEAGE: 1.00 MANAGER: J, GARLAND
STATUS:
CONG DIST. 10
0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
FRANKLIN SR 17[@I-85 RECST INTERCHANGE-IM]FM NCL 12Y080 RECONSTRUCTION & WIDENING FROM 2 LANES TO
PROJECT MILEAGE: .00 MANAGER: UNKNOWN STATUS:
FRANKLIN CROMER'S MILL COVERED BRIDGE OFF SR 106 OVER 171150 BRIDGES/ ENHANCEMENT
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS: DOT WILL PROVIDE THE 20% MATCH
DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 122080/f.S. AN ASSOCIATED PROJECT.
o,~Jli,
22-Feb-1994 Page 11
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
PE 1994
$
ROW NONE
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
39 0
1310 1179
131
PE 1995 $
ROW 1994
$
CONST 1995 $
FED SHARE $
GA. SHARE $
0TH SHARE $
100 616 4388 3949
439
PE 1994 ROW 1995 CONST
UNDERWAY
$
0
AFTER 97
PE NONE $
0
ROW NONE $
0
CONST 1995
$
135
FED SHARE$
108
GA. SHARE $
27
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 12
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
G--W-IN-N--ET-T--I---8-5-.-IN-T-E-R-C-H-A-N-G-E---&--SU-G-A--RL-O-A-F--F-M---SR---1-2-0--TO---S-A-T-E-L-L-IT--E--&--1-1Y--2-3-0------A-T-LA--N-T-A--T-I-P--i--G-W---R--7-2--------------'
----Y--EA-R---------E-S-T-S--
PE 1988
UNDERWAY
110230 INTERCHANGE / NEW CONSTRUCTION
.<\:::: .
CONG DIST. 6
ROW 1995
$ 6325
PROJECT MILEAGE : 1. 50 - EXIST. LANES: o}Jt,1wPOSED LANES: 6
CONST 1995
$ 12185
MANAGER: J. GRAYBEAL (CM)
':c,
STATUS: co SGN 9-22-92 P UTL & $13M CST; ws REt>:tlB~p (:). _$SM 11-22-93
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 9748 GA. SHARE $ 2437
11Y230 IS AN ASSOCIATED PROJECT.
0TH SHARE $
GWINNETT I-85 FM s OF BOGGS RD TO N OF su&ii.81& PARKWAY i'i1Y231
110231 INTERCHANGE / NEW CONSTRUCTI01'1)/ (})
/
PROJECT MILEAGE : 2. 30 - EXIST?:i:Jliras: 8 /PROPOSED 'BfuEs: 12
MANAGER:
STATUS: SEE 110230
1
GWINNETT I-85 FM N OF SUGARL:;J !iit.N OF OLD P' TREE & CD SYS~,~~~tY233 110233"
;:~~~~~~E{G:E~ i~~~T!tt~~i~~- LANES: 8 /PROP9$l&:-~s: 12
MANAGER:. STATUS: SEE 110230
CONG DIST. 6 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 6 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1988
UNDERWAY
ROW 1996
$ 6420
CONST 1997
$ 30727
FED SHARE $ 27654
GA. SHARE $ 3073
0TH SHARE $
PE 1988 ROW 1997 CONST
UNDERWAY $ 5100 AFTER 97
GWINNETT I-85@ SR 317/SUWANEE 110235 LIGHTING/ RECST. OR REHAB.
PROJECT MILEAGE: .00 - EXIST. MANAGER: J. GARLAND STATUS: REQ CO DO LIGHTING ~ RD DESIGN
& 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
GWINNETT I-985@ SR 20 (SR 20 TO 3 LANES)
~~~: 110330: INTERCHANGE/ RECST. OR PROJECT MILEAGE : .39 -
LANES: 2 /PROPOSED LANES{\~
MANAGER: B FERGUSON (M)
STATUS: GWINNETT SGN 12-18-92 FOR PUB UTIL; BUFORD REFUSED
, ; ; ; : ~ , ~ Gw-R 69
F~~Ii~~~i: ~AT'.~: HIGHwiW\ FEDERA!. HIGHWAY AriMIN ,ttiijbs
GWINNETT I-85@ SR 20/LAWRENCEVILLE HIGHWAY 110360 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : 1.52 - EXIST. LANES: 2 /PROP~SED LANES: 4
MANAGER: B FERGUSON STATUS: GWINNETT siGNED 10-9~92 FOR PUBLIC UTILITIES ONLY
g~ t:: :..:.i..I.,.AC.OLNI!Gl!!D!.I>S::TTI. p10*,..',:,_.,R&.6/'.
FUND SOURcfi'isTATE MAINT.
FEDERAL itIGHWAY ADMIN
GWINNETT I-85 UPGRADE REST AREAS i75 & i 76 110430 REST AREA/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: J. GARLAND STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP
CONG DIST. i:10
FUND SOURCE: FEDERAL HIGHWAY
PE NONE
$
0
ROW NONE
$
0
CONST 1995 $
58
FED SHARE$
46
GA. SHARE$
12
0TH SHARE$
PE 1993 ROW 1997 CONST
UNDERWAY $ 1919 AFTER 97
PE 1993
UNDERWAY
ROW 1995 -,,rnhl 1996
$ 3049 $ 12595
FED SHARE.$ 11336
GA. SHARE$ 1260
0TH SHARE$
PE 1995
ROW NONE CONST
$
110
$
0
AFTER 97
"
"""""""'
= =
=
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GWINNETT I-85 SIGN MOD FM DEK CL TO SC STATE LN.\JACK/BANKS/BAR/FRANK 110440 SIGNING/ MAINTENANCE
PROJECT MILEAGE : 76.00 - EXIST. LANES: ~'\zgROPOSED LANES: 0 MANAGER: L. SEABROOK STATUS: NOT APPLICABLE
CONG DIST. 10 & 6
FUND SOURCE: I-STATE MAINT: FEDERAL HIGHWAY ADMIN FUNDS 11044W IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 13
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
144
FED SHARE $
144
GA. SHARE $
0TH SHARE $
GWINNETT I-85 @ SUGARLOAF - TO SHOW IM Fu&Bf\~
11Y230 INTERCHANGE / RECST. OR REHAB.{ PROJECT MILEAGE : . 00 - EXIST~:.CiLANES: 0 /PROPOSED MANAGER: UNKNOWN
STATUS:
ATLANTA TIP i GW-R 72
PE NONE
$
0
CONG DIST. 6
ROW NONE $
0
0
CONST 1995
$ 3250
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 2925
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
325
110230 IS AN ASSOCIATED PROJECT.
0TH SHARE $
GWINNETT 11Y231
STATUS:
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW 1996
$
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 380 1389
1111 278
GWINNETT I-85 FM SUGARLOAF TO OLD PEACHTREE 11Y233 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: STATUS:
GWINNETT SR 20 ON EXT LOC FM I-85 FOR 0.5 MI;NEW LOC 120680 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.10 MANAGER: B FERGUSON (M) STATUS: COUNTY REFUSED 1/92; BUFORD REFUSED 2/92 BUT WANTS PLANl{:i//
DIST. 6
: ~~J,~FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
GW 14 F~;ig~t:if: SURFACE T~1i&JY>
FEDEllidfi:GHWAY ADMIN FUNDS
PE NONE ROW 1997 CONST
PE 1993 ROW 1996 CONST
$
0
$
500
AFTER 97
UNDERWAY $ 4569 AFTER 97
GWINNETT SR 10/STONE MTN FWY FM ROCKBRIDGE RD TOE/HEWATT RD 121490 RECONSTRUCTION & WIDENING FROM 6 LANES TO 8 LANES.
PROJECT MILEAGE : 2.90 MANAGER: BILL MOSKAL (M) STATUS: GWINNETT SGN FOR PUBLIC UTILITIES 1-21-93.
:;1i;~si:P 4.!;tc
Filii~ souRdf:}tkJ/; L HIGHWAY
FEDERAL .HIGHWAY ADMIN FUNDS .( \.
12Y490fs)AN ASSOCIATED PRc::>JECTi
PE 1993 ROW 1995 ........ :coNST
UNDERWAY $ 2500 AFTER 97
GWINNETT P'TREE IND BLVE FM SR 20/SUGAR HILL NE TO RELOC SR 347/HALL 121676 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.50
MANAGER: B FERGUSON STATUS: REQ B'FD R&U 2/93;GAIN'VL Y SHILL P UTIL 11/93; CO REFUSED
ATLAN::,~[~ i GW 100 .(
CONG DIST. \10
.. ..
FUND souRcE: SURFA2fJ4~sPoRT.
FEDERAL HIGHWAY Apfiii'I FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$ 7500
FED SHARE$ 6000
GA. SHARE$ 1500
0TH SHARE$
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GWINNETT SR 124 FM CENTERVILLE-ROSEBUD RD TO HENRY CLOWER BLVD 121720 RECONSTRUCTION & WIDENING FROM 2 LANES T\._4 LANES.
PROJECT MILEAGE : 3.90
fyf::&ffdh>.. MANAGER: RAY METTS (CM)
STATUS: GWINNETT SGN 1-8-92 PUB UTIL (REFUSED
ATLANTA TIP lt GW 76 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
~:~:if GWINNETT
(ML
~:~~:+.f~!!!itd~ 122490
~:Ti!~H~Giu~~g~. P
PROJECT MILEAGE : . 00 - EXIST'{:j;iillits: 2 /PROPOSED dfil'.Es: 4
~:y:!~ :lKfr;o STATUS: ~A~~r~-t3
SAA
SEND OUT. -
ATLANTA TIP# GW-R 101 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
GWINNETT SR 10/STONE MTN F::,,t; OF HEWATT RD TO
122520 RECONSTRUCTION & WIDENING'\FROM 6 LANES TO 8
PROJECT MILEAGE : 3. 2 5 ::c::):,\_
MANAGER.: BILL MOSKAL
"\):\,,.
STATUS: REQ COUNTY DO UTILITIES 10-14f8~;..
ATLANTA TIP lt GW 57 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 14
FISCAL YEAR
COST ESTS
PE 1992 ROW 1997 CONST
UNDERWAY $ 5166 AFTER 97
PE 1993
UNDERWAY
ROW 1994
$ 2006
CONST 1996
$ 3228
FED SHARE $ 2582
GA. SHARE $
646
0TH SHARE $
PE 1994 ROW 1996 CONST
UNDERWAY $ 9035 AFTER 97
GWINNETT SR 316@ SR 20 122530 TURN LANES/ SAFETY
PROJECT MILEAGE: .36
m:it; EXIST. LANES: 0 /PROPOSED
0
MANAGER: L. OWENS
STATUS: GWINNETT SGN FOR PUBLIC UTILITIES 12-15-92 ..
OTO
GWINNETT SR 124 AT CLYDE WILLIAMS BOULEVARD NORTH OF sNJi't:tvILLE
122720 INTERCHANGE / NEW CONSTRUCTION
_
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES::
MANAGER:
STATUS:
FUND SOURCE: NAT'L'HIGHWAY
fEDE~. HIGHWAY ADMIN FUNDS
:-.:-:.::::::;;\\:
). }\.
>c::e:m~ DisI J .:.;-::-::.::::-:-:--.
FUN~ :J6w2i\i: DEMONSTRATfO~ tttai&.M
FEDi.itALHiGHWAY ADMIN'FUNDS
PE NONE
$
0
ROW LOCL
CONST 1996
$
223
FED SHARE$
223
GA. SHARE $ -
0TH SHARE$
PE 1995 ROW 1996 CONST
$
100
$
300
AFTER 97
GWINNETT SR 10 FM ROCKBRIDGE TO HEWATT - PARTIAL R/W FOR 121490 12Y490 UNKNOWN/ RECST. OR REHAB.
PROJECT MILEAGE .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: STATUS:
GWINNETT SR 13/BUFORD HIGHWAY@ GEORGE PIERCE PARK.
132320 TURN LANES/ SAFETY
PROJECT MILEAGE : _.15 - EXIST. LANES: 2 /PROPOSED LANES: 3
MANAGER: L. OWENS
STATUS: GWINNETT SGN 5-21-92 ROW & UTILITIES
OTO
A'l'tANTA TIP 1t GW i:24
)::{/cONG DI ST . 4 .,:::}( ,: ';::::;:::-
:Jit:~ =t;~; SOURCE;
HIGHWAY
FEDERALil:iGHWAY ADMIN
12149.0/fs 'AN ASSOCIATED
ATLANTA TIP lt GW CONG DIST ._,'6 -
FUND SOURCE: -HWY FEDERAL HIGHWAY
PE NONE ROW 1996"
NONE
$
0
$ 13500
$
0
PE NONE
$
0
ROW LOCL
CONST- 1995
$
187
FED SHARE $
168
GA. SHARE $
19
0TH SHARE $
.. "
)
,.
"
COUNTY P. I.NO.
DESCRIPTION
PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/eY 1997
COMMENTS
GWINNETT SR 13/BUFORD HWY FM OLD PEACHTREE RD TO---SUGARLOAF PKWY
132360 RECONSTRUCTION & WIDENING FROM 2 LANES Q_._4 LI\NES.
PROJECT MILEAGE : 00
coNs_Tf~f~TibN MANAGER: GENE POWELL (M)
STATUS: REQ couNTY no UTILITIES, Row & 20%
1-22-93
ATLANTA TIP ti GW ,a
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 15
FISCAL ,EAR
COST ESTS
" 1996
ROW LOCL CONST
$ "
" AFTER
GWINNETT RONl'.l.O REAGAN PARKWAY @ CLYDE WILLIAMS' -BLVD
132370 INTERCHANGE / NEW CONSTRUCTION -. - , ,
PROJECT MILEAGE : . 00 EXIST:.'),~;.;~-: 0 /?ROPOSED
MANAGER: J. GRAYBEAL
. ;:
STATUS:
,;.,,,, "'' ,, C,
nSS' '<""'
;,_ -,,_.,.,,.,.' <;;_::--
CONG DIST .
0
" 1995
ROW 1996 CONST
$
160
$ 1500
AFTER 97
FUND SOURCE: DEMONSTRATION PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
GWINNETT SR 324 AT CR 203 ANO c:ii:-:_211 141800 INTERSECTION IMPROVEMENT_/-. SAFETY
,..)\).'
P!tOJtCT MlLEAGE : ,50 - EXlS_'!', LANES: 2 /PROPO_s}i:,D_' riiiliiis: 2
MANAGER: L. OWENS
. " ,,,
''6i
STATUS: GWINNEtT SIGNED FOR PUBLIC UTJ':t,:;l_T_I_ES 12-18-:,2'/'. -;_.-
6T_o
ATLANTA TIP f GW 131
CONG DIST. 10
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
" 1994
ROW 1995
UNDERWAY
$
50
CONST 1995
$
262
''' ,so SHARF,
GA. SHARE Q,H SHARE
' "26
GWINNETT CR 1943/MT MORIAH ROAD@ LITTLE MULBERRY RIVER 141950 REPLACEMENT OF THE EXISTING BRIDGES (S). NO ADDED
PROJECt MILEAGE : .20 MANAGER: L. OWENS STATUS: SEND LGPA 10/94-
GWINNETT KILLIAN HILL RD FM US 29 TO FlVE FORKS 150260 Rl!:CONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE : 00
MANAGER: D. SMITH STATUS: CONTRACT REQ COONTY DO ROW, UTIL, PE, 20\ CONST- 9-24-93
DIST. 10
SOURCE: BRIDGE PROGRAM FEpE_R?,,L, HIGHWAY ADMIN FUNDS
. ;~~:T~ ;~k i GW 7 ._,_ CONG DIST:( (Jl '.,",',,, _.w '".'' FUND:..'i6uncit: soRFAcE TRANSPOR;/_-:.FEoERA.t; aIGawAY ADMIN.FUNDS
" 1995
ROW LOCL
'
5
' CONST 1997 FED SHARE $
" '26D
GA. SHARE $
65
'' SHARE $
" 1995
ROW LOCL CONST
$
,0
AFTER 97
:.;:\;';.. .''::ti-'./}?:
" GWINNETT KILLIAN HILL RD FM FIVE FORKS TRICKOM TO OS
150270 RECONSTRUCTION & WIDENING FROM 2 I.ANES tO 4 LANE$. PROJECT MILEAGE : .00 MANAGER: D. SMITH
STATUS: Ct REQ CO DO PE, ROW, UTIL, 20% CST 9-24-93
)).i~TA TIP jf
PE 1995
''-'.".,CONG IHST. 4
ROW LOCL
_,._ ' ; ::_'CONST
--FliND souR~i'ii~tii:;.FAcE TRANSP~~";_{','.'_':
:~:-~ FEDE-R~A~L. H:tC1lWAY ADMIN FONDS .. : -
'(.,:-
AFTER 97
GWINNETT FIVE FORKS TRICKUM FM KILLIAM HILL RD TO OAK RD
150280 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 2.47
MANAGER: D. SMITH STATUS: CONTRACT REQ CO DO ROW, UTIL, PE & 20% CONST 9-24-93
ATLANTA TfP 8 GW 4
CONG DIST. ,4
FUND SOURCE: SURFACE:-TRANSPORT. FEDERAL HIGHWAY ADMIN' FONDS
PE 1995 ROW I.OCL CONST
$
,0
AFTER 97
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GWINNETT TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN 170950. SIGNALS / SAFETY
PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: BURT .RIDDLE STATUS: GWINNETT SGN 8-17-93 ROW,
ATLANTA TIP# GW 135 CONG DIST. 4 & 6 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 16
FISCAL YEAR
COST ESTS
PE 1994
$
325
ROW NONE
$
0
CONST 1995
$
510
FED SHARE $
408
GA. SHARE$
54
0TH SHARE,$
156
GWINNETT CR 685/WESTBROOK ROAD@ IVY 171110 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE.: .20
MANAGER: L. OWENS STATUS: SEND LGPA IN 1997
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995
$
8
ROW LOCL
CONST 1997
$
280
FED SHARE $
224
GA. SHARE $
56
0TH SHARE $
GWINNETT CR 449/RIVER DRIVE 1711~0 REPLACEMENT OF THE
.PROJECT MILEAGE.:.
MANAGER: L. OWENS STATUS: SEND LGPA 10/94.
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
'-.
PE 1995
$
8
ROW LOCL
CONST 1997
$
445
FED SHARE $ 356 GA. SHARE $ . '89
0TH SHARE $
GWINNETT CR 1959/CENTERVILLE-ROSEBUD 171135 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .20 MANAGER: L. OWEBNS STATUS: SEMO LGPA 10/94
DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995
$
8
ROW LOCL
CONST_ 199_7
$
318
FE_D SHARE $ 254
GA. SHARE $
64
0TH :$HARE $
GWINNETT CAPITAL FOR GWINNETT COUNTY VANPOOL PROJECT 1D7036 :TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
GWINNETT CAPITAL FOR VANPOOL PROJECT 1D7037 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
it~!i !jf ) 1
)' ()NG DIST. 4,,J
FUND sou1i.~i] 1tiU~ TRANSIT
FEDERAL-TRANSIT ADMIN
192 154 19
19
1995
$
100
FED SHARE $. 50
GA. SHARE.$
0TH SHARE.$
50
GWINNETT CAPITAL FOR COORDINATED E & H SERVICES FOR GWINNETT COUNTY 1D7038 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY
MANAGER: STEVE KISH STATUS: NOT APPLICABLE
CONG DIST ..,,.4
FUND SOURCE: FEDERAL TRANSIT
CAPITAL 1995
$
703
FED SHARE$
562
GA. SHARE$
71
0TH SHARE$
70
.. ,.
/I
,.
-
.....,,.,.,,
.,ll!!!l!!!!!!!!'
"
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GWINNETT COORDINATED E & H SERVICES FOR GWINNE'TT'::CC)UilT 107039 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 17
FISCAL YEAR
COST ESTS
OPERATING 1995
$
348
FED SHARE $
174
GA. SHARE $
0TH SHARE $
174
GWINNETT CAPITAL FOR GWINNETT COUNTY 107040 TRANSIT PROJECTS/ CAPITAL.
FUNDS RECIPIENT: GWINNETT MANAGER: STEVE KISH STATUS: NOT APPLICABLE
CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$ 288
FED SHARE $
230
GA. SHARE $
29
0TH SHARE $
29
GWINNETT VANPOOL SERVICE FOR r-rof~M~TT
107041 TRANSIT PROJECTS/ FUNDS RECIPIENT: MANAGER: STEVE KISH
STATUS: NOT APPLICABLE
CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
100
FED SHARE $
50
GA. SHARE $
0TH SHARE $
50
GWINNETT CAPITAL FOR COORDINATED E & H SERVICES 107042 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
DIST. 4 & 10
SOURCE: URBAN TRANSIT TRANSIT ADMIN FUNDS
CAPITAL 1996
$ 607
FED SHARE $
486
GA. SHARE $
60
0TH SHARE $
61
GWINNETT COORDINATED E & H SERVICES FOR GWINNETT 107043 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1Vl029 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1Vl030 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
URBAN TRANifrf ( -.. OPERATIN~E~ 9;!ARE ;
348 174
DIST
,,,;:;J,1,,ADMIN FUNbS :.-.-:-:-::
GA. SHARE $ 174
0TH SHARE $
4
i!~ souRd{l~tb;RLY & oisJ;;;;:~~TAL
5 sHARE;
42 34
FED.Ii,~ ".r~~!T ADM IN FUNDS / '
GA. SHARE $
4
:::::~: :~:.n1I;f~:~:' :=; 4
44
FEDERAL TRANSIT ADMIN FUNDS
~~~TAL ::~,
GA. SHARE$
35
5
0TH SHARE$
4
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HABERSHA SR 17 FR 3-LANE@ SUTTON MILL CK TO SR 122440 RECONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE: 1.00 MANAGER: EX OWENS (M) -STATUS: SEND LGPA IN 1997
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 18
FISCAL YEAR
COST ESTS
PE 1993 Row 1997
CONST
UNDERWAY $ 243 AFTER 97
HABERSHA SR 105 EB MP 6.95-8.0; WB 8. 122450 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 2.05 MANAGER: L. OWENS (M) STATUS: SEND LGPA WHEN PROJECT
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY.ADMIN FUNDS
PE ROW CONST
$
27
.AFTER 97
AFTER 97
HABERSHA SR 105 OVER SOQUEE 122455 REHAB. OF THE EXISTING
PROJECT MILEAGE : .00 MANAGER: L. OWENS (M) STATUS: SEND LGPA IN 1997
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM .FEDERAL HIGHWAY ADMIN FUNDS
PE ROW NONE CONST
$
5
$
0
AFTER 97
HABERSHA CR 97/WELCOME HOME CHURCH RD OVER SOUTHERN 170890 REPLACEMENT OF THE EXISTING BRIDGES(S). NO
PROJECT MILEAGE: .27 MANAGER: . L. OWENS STATUS: HABERSHAM SGN DO ROW, UTILITIES &
HABERSHA CR 94/NANCY TOWN RD OVER SOUTHERN RR NE OF MT 170891 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER: L. OWENS
STATUS: HABERSHAM SGN DO ROW, UTILITIES & DETOURS 4-20-92
HABERSHA TALLULAH GORGE TRAILS/LANDSCAPING ALONG OLD 441; SEE RABUN 17104X. BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN STATUS:
HABERSHA COUNTY OPERATED PUBLIC TRANSIT SERVICE 1Bl019 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE KISH STATUS:
DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
Disi'[ it:
F~;:16Wtf: BRIDGE PROGi&J;;> FEDE!VcthiiIGHWAY AbtiJN }!JNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995
$
462
FED SHARE $ 370
GA. SHARE $
92
0TH SHARE $
PE 1993 UNDERWAY
ROW LOCL
CONST 1995
$
404
FED SHARE $
323
GA. SHARE $
Bi
0TH SHARE $
!~~: . :Jl;;G DIST. 9
/;~;; SOURcf:;
.FEDE:~ -~ii:i!i:WAY
:~:!;:
roNG
FUND SOURCE: FEDERAL TRANSIT
PE LOCL
ROW 1995
$
0
1995 $
0
FED SHARE $
GA. SHARE $
0TH SHARE $
OPERATING 1995 $
49
FED SHARE$
26
GA. SHARE$
0TH SHARE$
23
ft
,,
= =
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HABERSHA COUNTY.OPERATED PUBLIC TRANSIT SERVICE 1B1020 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE KISH STATUS:
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS
HABERSHA ONE STANDARD VAN AND ONE 1C2019 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 19
FISCAL YEAR
COST ESTS
OPERATING 1996
$
52
FED SHARE $
28
GA. SHARE $
0TH SHARE $
24
CAPITAL 1995
$
21
FED SHARE $
17
GA. SHARE $
2
0TH SHARE $
2
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HALL 110465
STATUS:
I-985@ SR 11, NB EXIT LOOP & SB EXIT INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: J. GARLAND (M) SEND LGPA IN 1997
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 20
FISCAL YEAR
COST ESTS
PE ROW
CONST
$
20
AFTER 97
AFTER 97
HALL 110470
STATUS:
I-985@ SPOUT SPRINGS ROAD TURN LANES/ SAFETY PROJECT MILEAGE : .00 MANAGER: L. OWENS SEND LGPA IN 1997
CONG DIST. 9 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE ROW CONST
$
19
AFTER 97
AFTER 97
HALL 121590
STATUS:
SR 53 CONN FM SR 53 RECONSTRUCTION & PROJECT MILEAGE : .80 MANAGER: B FERGUSON GAINESVILLE SGN 7-28-93
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1992 UNDERWAY
CONST 1995 $ 1449 FED SHARE $ 1159 GA. SHARE $ 290 0TH SHARE $
HALL 121610
STATUS:
SR 53/MCEVER RD FM MUNDY MILL RD RECONSTRUCTION & WIDENING FROM 2 PROJECT MILEAGE : 2.50 MANAGER: L. OWENS SIGNED HALL 4/91, OAKWOOD
DIST. 9
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995
$ 6194
FED SHARE $ 4955
GA. SHARE $ 1239
0TH SHARE $
HALL 121620
STATUS:
SR 53C REL/GAINESVILLE FM SR 53C/W BYP TO SR CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
\:qQNG DI$'li}(J
PE 1992 ROW 1992
UNDERWAY UNDERWAY
PROJECT MILEAGE : .90 MANAGER: BILL MOSKAL
_ _ _1Ii_!ll:llf
DOT TO PAY ROW, UTILITIES & 100% CONST PER LETTER 5 2 91
CONST 1995 $
FUNo::Jawtr: NAT'L HIGHwAf/>
FED:e:RAt rti:GHwAY .ru:iMrn?FtiNos
12fil2o>is AN AssoctATiDPfloJEcT.
......... .
<
FED SHARE $ GA. SHARE $ 0TH SHARE $
5429 4343 1086
HALL 12167X
STATUS:
P'TREE IND BLVD FM SR 20/SUGAR HILL TO SR 347/SEE GWINNETT RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .OO MANAGER: B FERGUSON REQ COUNTY DO ROW AND UTILITIES 8-3-89.
HALL 121810
STATUS:
SR 11/US 129 FM 0.4 MIS/SR 323 TO 0.3 MIS/CR 719 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.70 MANAGER: L. OWENS REQ ~AINESVILLE PUB UTIL 1-15-91; HALL SGN 3-11-91/UTILITIES
PE 199~ UNDERWAY
:as;G DIST. 9.
ROW LOCL
T~~;~fii . . . .. !:~R~~lif!~t~k~~~N
CONST 1995 $
0
FED SHARE$
GA'. SHARE$
~: :i~, - 12167f's.:hli AssocIATED PRoiEct
0TH SHARE$ PE 1993 UNDERWAY
CONS
ROW 1993 UNDERWAY
CONST 1996 $ 3249
FUND SOURCE: NAT 1 kid~:AY
FED SHARE $ 2599
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 650
0TH SHARE $
..
=
,---,,.
~
.,
t,
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HALL 132200
STATUS:
SR 211 N/BARROW CO LINE@ MULBERRY REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: L. OWENS HALL COUNTY SIGNED 7-8-91 FOR
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
HALL 132250
STATUS:
SR 52: WB MP 11.85 TO 13.20 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.35 MANAGER: L. OWENS (M) SEND LGPA IN 1997
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 21
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY CONST 1995 $ 930
FED SHARE $ 744 GA. SHARE $ 186 0TH SHARE $
PE ROW CONST
$
13
AFTER 97
AFTER 97
HALL 141810
STATUS:
SR 13/ATLANTA HWY FM RECONSTRUCTION & Tn1~M-rMri'i,,or1u
PROJECT MILEAGE : 4;90 MANAGER: J. GARLAND (M) SEND LGPA WHEN PROJECT IS
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE ROW CONST
$ 300 AFTER 97 AFTER 97
HALL 141840
STATUS:
SR 283/MT VERNON RD FM S .TURN LANES/ SAFETY PROJECT MILEAGE : 1.25 - EXIST. LANES: MANAGER: L. OWENS REV REQ HALL DO ROW & UTIL 2-9-94;REQ
DIST. 9
SOURCE: HWY. SAFETY HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW LOCL
CONST 1996
$
631
FED SHARE$
568
GA. SHARE$
63
0TH SHARE$
HALL 150140
STATUS:
SR 13/PEACHTREE RD@ SOUTHERN RR
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
}:/}:t;~~G
PROJECT MILEAGE : .40
.{}C'{i}''
MANAGER: L. OWENS
NO UTILITIES INVOLVED PER DISTRICT 8/89
BRIDGE PROGID F Ab~rn Jwips
PE 1985 UNDERWAY
ROW 1987 UNDERWAY
CONST 1996 $ 1160
FED SHARE $ 928
GA. SHARE $
232
0TH SHARE $
HALL 150200
STATUS:
SR 53 FM SR 369/BROWNS BRIDGE RD TO SR 53 CONN RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.10 MANAGER: BILL MOSKAL SEND LGPA IN 1996
souRc/ itikAcE TRANSPoii:ii >
FEDERAL FIIGH#AY ADMIN
PE 1993 ROW 1996
/ toNsT
UNDERWAY $ 1389 AFTER 97.
HALL 170536
STATUS:
CR 928/WHITEHALL RD@ NORTH OCONEE RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. PROJECT MILEAGE: .00 MANAGER: L. OWENS HALL COUNTY SIGNED 4-25-88 FOR'ROW AND UTILITIES
CO~G DIST.\~
FUND SOURCE: BRIDd~:iti~RAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW LOCL
CONST 1996 $
93
FED SHARE$
74
GA. SHARE$
19
0TH SHARE$
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HALL 170730
LAKE LANIER ACCESS. RD FM I-985/SR 365 TC>.. SHORELAND DR/CR 592
CONSTRUCTION OF NEW ROUTE WITH 4 LANES Pi'i.OPOSED.
PROJECT MILEAGE : 2 .10
.
.:,.,..
STATUS: ~t~~R~/~~~~~o:UFORD 6/89 UTIL;GA_~-~ifvi~ .7/93 P UTIL.
HALL
To::: II LAKE LANIER ACCESS RD FM I-985
(PH
~\~S 3 & 4)
170735 RECONSTRUCTION & WIDENING FROM/f t,AAES TO 4 LANES.
qdi; ~gi PROJECT MILEAGE : 3. 80
STATUS: : =tG~~~ ti~~~~sg~IL;
/ 6-20-89
CONG DIST, 9 FUND SOURCE: LAKE ACCESS PROGRAM FEDERAL.HIGHWAY ADMIN FUNDS 170730 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: LAKE ACCESS PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 22
FISCAL YEAR
COST ESTS
PE 1986 UNDERWAY
ROW 1987 UNDERWAY
CONST 1995
$ 1770
FED SHARE $ 1682
GA. SHARE $
89
0TH SHARE $
PE 1994
$
ROW 1994
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
85 2000 2916 2770
146
HALL
CITY OF GAINESVILLE-Btkf/#EDSTRIAN PATHS TO INTERc&tii2T
171030 BICYCLE/PED. FACILITY f' ENHANCEMENT
PROJECT MILEAGE : . oo - EkfsT. LANES: o /PROPQSEP tlilits: o
MANAGER: T. LONG
STATUS: LGPA TO BE DONE BY CONTRACT
CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996
$
500
FED SHARE $
400
GA. SHARE $
0TH SHARE $ 100
HALL 171060
STATUS:
RESTORE FLOWERY BRANCH RAILROAD DEPOT MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: T. LONG LGPA TO BE DONE BY CONTRACT
DIST. 9
SOURCE: TRANS. ENHANCE.
f :r-.; \ .F-.-.-E.-.-,D-..E.R.-A-L..:-....HIGHWAY ADMIN FUNDS
HALL 171090
STATUS:
RENOVATION OF GAINESVILLE DEPOT
ors! Ii MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
............... :\GONG
6 PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED
:: >: Jaw2r r/ MANAGER: T. LONG
LANES:
FU~;
TRANS. ENHANCE
'LGPA TO BE DONE BY CONTRACT
FEDERAJ}:HfoHWAY ADMIN,
PE LOCL
ROW NONE
$
0
CONST.1997
$
250
. FED SHARE $ 200
GA. SHARE $
0TH SHARE $
50
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
295
FED SHARE $ 236
GA. SHARE $
0TH SHARE $
59
HALL 1B1024
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FONDS RECIPIENT: HALL MANAGER: STEVE KISH
/)\CONG DIST. 9 .cc'c':,:,:,,.cc-,, ,.
FUND souRc:iT'@fu
FEDERAL ,".rru'illSIT ADMIN
1995
$
185
FED SHARE$
105
GA. SHARE$
0TH SHARE$
80
HALL 1B1025
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HALL MANAGER: STEVE KISH
CONG DIST. '\9
FUND SOURCE: FEDERAL TRANSIT
OPERATING 1996
$
194
FED SHARE$
111
GA. SHARE$
0TH SHARE$
84
"
"
..
,,
r.-- ........
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HALL 1C2024
STATUS:
ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HALL MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
HALL 1C2025
STATUS:
ONE STANDARD VAN AND ONE
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HALL MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 23
FISCAL YEAR
COST ESTS
CAPITAL 1995
$
21
FED SHARE $
17
GA, SHARE $
2
0TH SHARE $
2
CAPITAL 1996
$
21
FED SHARE $
17
GA. SHARE $
2
0TH SHARE $
2
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HART 11051X
STATUS:
I-85 SB WELCOME CENTER; SEE FRANKLIN REST AREA/ RECST. OR REHAB, PROJECT MILEAGE 1.00 - EXIST. LANES: MANAGER:
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 24
FISCAL YEAR
COST ESTS
PE 1995
$
0
ROW 1994
$
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
HART 132150
STATUS:
SR 77-FM SR 77 C TO SR
MINOR WIDEN & RESURF / PROJECT MILEAGE : 4.83 MANAGER: L. OWENS HART COUNTY SGN 1-12-93
PE 1993 UNDERWAY
CONG DIST, 10
ROW 1993 UNDERWAY
3
CONST 1996 $ 1236
FUND SOURCE: SURFACE TRANSPORT,
FED SHARE $
989
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 247
0TH SHARE $
HART 132160
STATUS:
SR 77 FM SR 51 TO SR ADDITION OF A PASSING PROJECT MILEAGE : 5.20 MANAGER: L. OWENS HART COUNTY SGN 1-12-93
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
233'
CONST 1996 $ 2271
FED SHARE $ 1817
GA. SHARE $ 454
0TH SHARE $
HART 141850
STATUS:
SR 51 AT CR 503 AND CR 405 TURN LANES/ SAFETY PROJECT MILEAGE: ,00 - EXIST. MANAGER: L. OWENS CONTACT TRAFFIC OPERATIONS
DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1996 $
58
FED SHARE $
52
GA. SHARE $
6
0TH SHARE $
HART 170842
STATUS:
CR 240/GRIFFIN RD OVER LITTLE SHOAL CK NE OF REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER: L. OWENS
HART SIGNED 4-9-92 FOR ROW, UTILITIES AND DETOURS.
/CONG Dis.il Ho > UNO'. 18\JkH:: BRIDGE PROGfuUl
)HIGHWAY ADMIN.,ftiNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 225
FED SHARE $ 180
GA. SHARE $
45
0TH SHARE $
HART 170843
STATUS:
CR 245@ SHOAL CREEK 6.5 MI NE OF BOWERSVILLE REPLACEMENT OF JHE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .22 MANAGER: L. OWENS HART SGN 10-18-93 FOR ROW, UTILITIES & DETOURS
f ) ::!: i~b:G DIST. 10
FUND sou~e;::ji:~RIDGE PROGRAM
FEDERAL_.,-1tlGHWAY ADMIN
_ ,,_,,,,,.,,_,,_, ,,,,_.-
.....,--...::::::<:::?'
PE 1994
UNDERWAY
ROW LOCL
1997 $ 363
FED SHARE $ 290
GA. SHARE $
73
0TH SHARE $
HART 171080
STATUS:
CITY OF HARTWELL COURTHOUSE SQUARE SIDEWALKS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT _
CONG DIST. ':,10
FUND SOURCE: FEDERAL HIGHWAY
PE LOCL
Row NONE $'
0
CONST 1995 $
21
FED SHARE $
17
GA. SHARE $
0TH SHARE $
4
,,
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HART 1Bl029
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HART MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
HART 1Bl030
STATUS:
COUNTY OPERATED PUBLIC TRANSIT FACILITIES/ FONDS RECIPIENT: HART MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 25
FISCAL YEAR
COST ESTS
OPERATING 1995
$
38
FED SHARE$
20
GA. SHARE$
0TH SHARE$
18
.OPERATING 1996
$
41
FED SHARE$
22
GA. SHARE $
0TH SHARE$
19
GEORGIA DEPARTMENT OF TRANSPORTATION
"L.L-~eo-J.:1:1 ..
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 26
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------------------------------------------------------------------------------------------------------------------------
JACKSON SR 11/US 129 FM E/MIDDLE OCONEE RVR TO i:):R 236/INCL I-85 BR
PE 1992
UNDERWAY
110250 STATUS:
RECONSTRUCTION & WIDENING FROM 2 LANES T6:,4 LANES.
PROJECT MILEAGE : 4 5
,,,,,,,,,, ..
~:;~:= itif S~NG~~~A~i~iRSON REFUSED 9/J?/:
DIST LTR 10/92
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ROW 1995
$
CONST 1997
$
FED SHARE $
GA. SHARE $
1152 4221 3377
844
0TH SHARE $
JACKSON 11044Z
STATUS:
I-85 SIGN MOD FM DEK CL TO SC SIGNING/ MAINTENANCE PROJECT MILEAGE: 76.00 MANAGER: L. SEABROOK
JACKSON 121604
STATUS:
t:: SR 11 FM PROP . JEFF~:~:8*ii~~ W TO s CITY LIMITS p
:::ilA.ss
RECONSTRUCTION & WIDENING/FROM 2 LANES TO 4
~:;~:= PROJECT MILEAGE : 2 . 40 . . . S~NG~~~wt;n~~) CITY :~titJSEP 9/92; sit bfsT iTR 19/92 ....:::-:--.: ...,,..-..c--
CONG DIST. 10 & 6 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 110440 Is-AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
PE 1992
UNDERWAY
ROW 1995 $ 3190
CONST 1997
$ 3971
FED SHARE $ 3177
GA. SHARE $ 794
0TH SHARE $
JACKSON 122400
STATUS:
SR 53 NEAR HOSCHTON NB FM MP 6.8-8.4 ADDITION OF A PASSING LANE. PROJECT MILEAGE: 1.60 MANAGER: L. OWENS {M) SEND LGPA WHEN PROJECT IS ADDED TO CWP
:::= HoNG DIST. 10
; FUND SOURCE: SURFACE TRANSPORT. ,FEDERAL HIGHWAY ADMIN FUNDS
"\\:.}=}:)?'
=:t
JACKSON 122510
STATUS:
SR 15 ALT REHAB. OF
IN JEFFERSON THE EXISTING
BATRIDBGIGE {CSU) R. RYFROCMREE2KLANES
TO
3
LANES{:C:C::',,,.... :_,-,',',,,,_-,_.CONG
DIST_,_:,-.,-: }:,-,f. o
PROJECT MILEAGE : .00 MANAGER: L. OWENS
;:b ~6Bit&k\ BRIDGE PROG~::>=
SEND LGPA IN 1996
FEDElli jfi:GHWAY AD!:1IN FUNDS
PE ROW CONST
$
9
AFTER 97
-AFTER 97
PE 1993 ROW 1997 CONST
UNDERWAY
$
20
AFTER 97 .
JACKSON 132070
STATUS:
SR 335 W/NICHOLSON@ NORTH OCONEE RIVER REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER:: L. OWENS JACKSON COUNTY SGN 6-3-92 FOR UTILITIES.
JACKSON 171000
STATUS:
CR 184@ WALNUT CREEK 4 MI NORTH OF BRASELTON REPLACEMENT OF THE EXISTING BRIDGES (S) . NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER:L. OWENS JACKSON SGN 10-18-93 ROW, UTILTIES & DETOURS
::;15:G DIST. 10: :::: \ / /
FUND souRcfi BRIDGE PROGRAM FEDERAL l!IGitWAY ADMIN
CON~',: ~~: ~
FUND SOURCE: FEDERAL HIGHWAY
PE 1989 UNDERWAY
ROW 1994
UNDERWAY
1995 $ 800
FED SHARE $
640
GA. SHARE $ 160
0TH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1997 $ 186
FED SHARE$ 149
GA. SHARE$
37
0TH SHARE$
=
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
JACKSON 171001
STATUS:
CR 269@ CANDLER CREEK 8.5 MI NE OF REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .20 MANAGER: L.OWENS JACKSON SGN 10-18-93
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 27
FISCAL YEAR
COST ESTS
PE 1994 UNDERWAY
ROW LOCL
CONST 1997
$
630
FED SHARE $ 504
GA. SHARE $ 126
0TH SHARE $
JACKSON 171002
STATUS:
CR 367/WHITES BOTTOM ROAD@
REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .20 MANAGER: L.OWENS JACKSON SGN 10-18-93
& DETOURS
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW LOCL
CONST 1997 $ 223
FED SHARE $ 179
GA. SHARE $
45
0TH SHARE $
JACKSON 171070 STATUS:
HISTORIC JACKSON CO.
LANDSCAPING/
r~,~~,~~
PROJECT MILEAGE : .00 -
MANAGER: JANET HARVEY
LGPA TO BE DONE BY CONTRACT
CONG DIST. 10
0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1997 $ 179
FED SHARE $ 143
GA. SHARE $
0TH SHARE $
36
JACKSON 171100
STATUS:
DOWNTOWN COMMERCE STREETSCAPE & PRESERVATION BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE, : . 00 - EXIST. LANES: 0 MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT
SOURCE: TRANS. ENHANCE.
.. :\
ADMIN FUNDS
PE LOCL
ROW NONE $
0
CONST 1997 $ 363
FED SHARE $ 290
GA. SHARE $
0TH SHARE $
73
JACKSON 1Bl079
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISH
Disfj '.1o
;:~=:iB&k8k1 ; RURAL TRANS!
" .OPERATING 1995 $ FED SHARE$
25 14
FEDiiW:.iRANsIT AriMm:tuNos
GA. SHARE$
0TH SHARE$
11
JACKSON 1B1080
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISH
FUND SOURci; iliHw. TRANSIT
FEDERAL ,-TAAN'SIT ADMIN
1996 $
26
SHARE$
15
GA. SHARE$
0TH SHARE$
11
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
LUMPKIN 122370
STATUS:
SR 52 WB BETWN CR 190 & CR 253 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.60 MANAGER: L. OWENS SEND LGPA IN 1995
CONG DIST. 9
FOND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 28
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1996
$
20
CONST 1997
$
667
FED SHARE $ 534
GA. SHARE $ 133
0TH SHARE $
LUMPKIN CR 213 OVER WATERS/DICKS 170900 BRIDGES/ REPLACEMENT
PROJECT MILEAGE : .. 00 MANAGER: L. OWENS STATUS: LUMPKIN SGN 3-19-92
CONG DIST . 9
FOND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FONDS
PE 1993 .UNDERWAY
ROW LOCL-
CONST 1~96 $ 110
FED.SHARE$
110
GA. sHARE $
0TH SHARE$
LUMPKIN 170910
STATUS:
BRIDGE REPLACEMENT BRIDGES/ REPLACEMENT PROJECT MILEAGE : . 00
MANAGER: L. OWENS LUMPKIN COUNTY SGN FOR
CONG DIST. 9
FOND SOURCE: FED. LANDS . FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE $
. 0
CONST 1995 . $ 462
FED SHARE$ 462
GA. SHARE$
0TH SHARE$
LUMPKIN 1Bl034
STATUS:
'COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FONDS RECIPIENT: LUMPKIN MANAGER: STEVE_ KISH
DIST. 9
FOND SOURCE: RURAL TRANSIT
OPERATING 1995 $
31
. FED SHARE $
19
]fE[))!:~ T~SIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
12
LUMPKIN 1Bl035
STAT.US:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS-RECIPIENT: LUMPKIN MANAGER: STEVE KISH
i 9
RURAL TRANsf4j:: J>PERATIN;Et !!ARE
33 20
Al'.>MIN FtiNOS
GA. SHARE $
0TH SHARE$
13
LUMPKIN 1C2Q34
STATUS:
ONE CONVERSION VAN WITH.LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LUMPKIN MANAGER: STEVE KISH,
-LGPA NOT APPLICABLE
1995
$
32.
FED SHARE$
26
GA. SHARE$
3
0TH SHARE$
3
,,
"""""""'
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MADISON 122185
STATUS:
SR 8/US 29@ BRUSH CRK & S. FORK BROAD REHAB. OF THE EXISTING BRIDGE(S). FROM PROJECT MILEAGE : .00 MANAGER: B FERGUSON (M) LGPA WILL BE SENT WHEN FR-003-3(47)
TO 4 LANES.
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MADISON 170786
STATUS:
CR 37@ MASONS MILL CREEK 5 MI REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .20 MANAGER: L. OWENS MADISON SGN 10-15-93
CONG DIST. 10
FOND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 29
FISCAL YEAR
COST ESTS
PE 1995 $
ROW NONE $
CONST 1997
$
FED SHARE$
GA. SHARE$
0TH SHARE$
20
0
1118 894 224
PE 1994 UNDERWAY
ROW LOCL
CONST 1996 $ 230
FED SHARE$
184
GA. SHARE$
46
0TH SHARE$
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
OCONEE 12257X
STATUS:
SR 10/US 7B MONROE TO UNKNOWN / UNKNOWN PROJECT MILEAGE : .00 MANAGER: UNKNOWN
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WALTON LANES: 0
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
OCONEE 141970
STATUS:
SIMONTON BRIDGE RD FM US 441 MINOR WIDEN & RESURF / RECST. PROJECT MILEAGE : 2.50 MANAGER: L. OWENS
CONG DIST. 10 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 30
FISCAL YEAR
COST ESTS
PE 1994
$
0
ROW NONE
$
0
CONST 1997
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE ROW LOCL CONST
$
20
AFTER 97
OCONEE 1419B0
STATUS:
MARS HILL RD/CR 263 MINOR WIDEN & RESURF / PROJECT MILEAGE : 3.BO MANAGER: L. OWENS
CONG DIST. 10 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
OCONEE 150210
STATUS:
.-::;
CR 473/EPPS BRIDGE RD FM SR 10 TO SR lOBUS/US 7B/c!..Afil& RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.,,,/{':,,,,,.:. _.. PROJECT MILEAGE : 3.30 MANAGER: B FERGUSON (C) OCONEE SGN 5/92;CLARKE REFUSED
} 'ATHENS TIP ft II-03 :)',CONG DIST. 10
::UNO SOURCE: NAT'L HIGHWAY
ct$2Isls FEDERAL HIGHWAY ADMIN FUNDS AN ASSOCIATED PROJECT.
PE ROW LOCL CONST
$
20
AFTER 97
PE 1992
UNDERWAY
ROW 1995 $ 2700
CONST 1996
$ 10373
FED SHARE $ B29B
GA. SHARE $
22B
0TH SHARE $ 1B47
OCONEE 150215
STATUS:
OCONEE 171145
STATUS:
EPPS BRIDGE RD @ MCNUTT CRK/ALSO CLARKE co
.. : ,,,,,.. ATHENS T::i:i1:il II-03
PE 1993 UNDERWAY
REHAB. OF THE EXISTING BRIDGE (S). FROM 2 LANES TO 4 LANES( :,,:::,:::::/?CONG DIST.{:'"10
ROW NONE
$
0
~~i!:M!L:~~~u~o/~c)
FUN~J8Jkhi: BRIDGE PROG~ { .
9 CONSiE~ :!ARE
~
~i;
SEE 150210
ELDER'S MILL COVERED BRIDGE ON CR 129 OVER ROSE CREEK BRIDGES /-ENHANCEMENT PROJECT MILEAGE: .00 MANAGER:.UNKNOWN
FEDE!lKi HIGHWAY ADMIN FUNDS
GA. SHARE $
179
1so2fo is AN Associ:il.TED PROJECT. > ::
OTH SHARE $
:,.T. *~~. .~~ =~=~ 11)1id!:m:G; ,o<twl!IJJI:t' 1 SOURc~'i
~ ENHANCE.-:,:,:/::C:,:-:/:::::::c c:misFTE~ 9!~ARE
:
:~
DOT WILL PROVIDE THE 20% MATCH
FEDE~,.Jil:GHWAY ADMIN
GA. SHARE$
17
0TH SHARE$
. ,.
I
"""""""' """""""'
t,.,_..._oJ.:.,..~l
~
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE .TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
RABUN 121950
STATUS:
SR 2 ACROSS DAVIS GAP/EB MP ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.32 MANAGER: L. OWENS DOT WILL PAY UTILITIES 11-10-92
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 31
FISCAL YEAR
COST ESTS
PE 1993 ROW 1997 CONST
UNDERWAY
$
242
AFTER 97
RABUN 171040
STATUS:
TALLULAH GORGE
BICYCLE/PED. FA PROJECT MILEAGE MANAGER: JANET LGPA TO BE DONE
RABUN 1B1039
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: RABUN MANAGER: STEVE KISH.
RABUN 1B1040
STATUS:-
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RABUN MANAGER: STEVE KISH
CONG DIST. 9
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW 1995 $
14
CONST 1995
$
708
FED SHARE$
566
GA. SHARE$
3
0TH SHARE$
145
CONG DIST, 9
OPERATING 1995 $
17
FUND SOURCE: RURAL TRANSIT
FED SHARE$
10
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
7
OPERATING 1996 $
18
SOURCE: RURAL TRANSIT
F_ED SHARE $.
10
TRANSIT ADMIN FUNDS
GA. SHARE$
. 0TH SHARE $
8
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION. IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
STEPHENS CR 146/RIVERDALE RD OVER WALTON CREEK NE .. OF TOCCOA
170832 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00
MANAGER: L. OWENS
STATUS: STEPHENS COUNTY SIGNED 4-7-92 FOR ROW:{
& DETOURS
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
1
STEPHENS CR 16/YOW MILL ROAD @ EASTANOLLEE9::tlif 1. 9 MI N 6#:\AVALON
170833 REPLACEMENT OF THE EXISTING BRii:iGES(Si. NO ADDED LANES.
PROJECT MILEAGE : .20
MANAGER: L. OWENS
. ,,,,.,,,,,.:,;,,:,:,/c:c:,;.:c
STATUS: STEPHENS SGN DO ROW, UTif'.J<:r.:g:f& DETOURS 10-19-93
STEPHENS !i~~=~uf~.:!;~tJiF~!~~c~.:ccoA
171050
.\i?
MPRAONJAEGCETR: MJIALENAEGTEHA: RV.0EY0 - EX.I..ST.. . LANES: 0 /PROPOS...J..!.:.O...L...A...N. ES: 0
STATUS: LGPA TO BE DONE BY CONTRACT
CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
22"".Feb-1994 Page 32
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW LOCL
CONST 1995
$
354
FED SHARE$
283
GA. SHARE$
71
0TH SHARE$
PE 1994
UNDERWAY
ROW LOCL
CONST 1996
$
218
FED SHARE $
174
GA. SHARE $
44
0TH SHARE $
PE LOCL
ROW NONE
$
0
CONST 1996
$
616
FED SHARE$
493
GA. SHARE$
77
0TH SHARE$
200
-
- """""""
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TOWNS 122230
STATUS:
SR 2/US 76 3 MILES SE/HIAWASSEE@ REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: L. OWENS (M) SEND LGPA WHEN PROJECT IS ADDED TO
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TOWNS 122420
STATUS:
SR 2/US 76 FM CR 3 TO SR 17 RECONSTRUCTION & WIDENING PROJECT MILEAGE : 1.50
MANAGER: L. OWENS SEND LGPA WHEN PROJECT
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
TOWNS 141960
STATUS:
SR 180 SP, BRASSTOWN RIDING SURFACE PROJECT MILEAGE : MANAGER:~. OWENS NOT APPLICABLE
ETC.CONG DIST. 9
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 33
FISCAL YEAR
COST ESTS
PE ROW CONST
$
17
AFTER 97
AFTER 97
PE ROW CONST
$
28
AFTER 97
AFTER 97
PE NONE $
0
ROW NONE $
0
CONST 1995
$
138
FED SHARE$
110
GA. SHARE$
28
0TH SHARE$
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
UNION 170870
STATUS:
CR 1/PAT COLWELL RD OVER NOTTERLY REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: L. OWENS COUNTY SIGNED 7-27-92 ROW, UTILITIES
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
UNION 170871
STATUS:
cR 1/PAT COLWELL RD OVER YOUNGC.Nl.ll:/CREEK REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: L. OWENS COUNTY SGN ROW,
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 34
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW LOCL CONST 1996 $ 1254
FED SHARE$ 1003 GA. SHARE$ 251 0TH SHARE$
PE 1993 UNDERWAY ROW LOCL CONST 1996 $ 782
FED SHARE$ 626 GA. SHARE$ 156 0TH SHARE$
"
tt
~
.,
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 35
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA -
COMMENTS
--------------------------------------------------------------------------------------------
----------------------Y-E-A-R --------E-S-T-S --
WALTON SR 124 CONN/SR 890 FM SR 500 TO SR
PE
$ 1500
122365 CONSTRUCTION OF NEW ROUTE WITH 4 LANES
CONG DIST. 10
ROW
AFTER 97
PROJECT MILEAGE : 5.10
CONST
AFTER 97 -
MANAGER: BILL MOSKAL
FUND SOURCE: NAT'L HIGHWAY
STATUS: REQ WALTON COUNTY DO UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
WALTON 12236Z
STATUS:
SR 124, CONN/SR 890 FM SR 124 CONSTRUCTION OF NEW ROUTE PROJECT MILEAGE : 6.30 MANAGER: BILL MOSKAL
WALTON 122560
STATUS:
SR 81 AT MONROE TURN LANES/ SAFETY PROJECT MILEAGE : .00 MANAGER: L. OWENS CONTACT TRAFFIC OPERATIONS
WALTON 122570
STATUS:
SR 10/US 78 MONROE TO ATHENS MEDIAN OPENINGS MEDIAN WORK/ SAFETY PROJECT MILEAGE : 16.00 - EXIST. LANES: 4 MANAGER: NOT APPLICABLE
WALTON 1Bl049
STATUS:
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF SOCIAL CIRCLE MANAGER: STEVE KISH
WALTON 1Bl050
STATUS:
CITY OPERATED PUBLIC TRANSIT ,SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF SOCIAL CIRCLE MANAGER: STEVE KISH
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122365 IS AN ASSOCIATED PROJECT.
PE ROW
CONST
$
0
AFTER 97
AFTER 97
CONG DIST. 10
0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW 1995
$
1
CONST 1996
$
109
FED SHARE $
98
GA. SHARE $
11
0TH SHARE $
DIST. 10
SOURCE: HWY. SAFETY ~~u~=~ HIGHWAY ADMIN FUNDS
PE 1994
$
ROW NONE $
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
10 0
1155 924 231
RURAL, TRAN.stfij:'.'} .. OPERATIN;E; 9;~ARE' ~
29 17
ABMrn<F.UNDs
GA. sHARE $
0TH SHARE$
12
sooRciit\k&~ TRANSIT 'FEbERAL,'rrou{slT ADMIN
1996 $
30
FED SHARE$
18
GA. SHARE$
0TH SHARE$
12
GEORGIA DEPARTMENT OF TRANSPORTATION
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 36
PROJECT LISTING BY COUNTY FY 1995/FY-1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-------------. -------------------------------------------------------------------------------------------------------------~-------
WHITE SR 75 FM SR 75 ALT/CLEVELAND NE TO CR
PE
$
33
122130 RECONSTRUCTION & WIDENING FROM 2 LANES
CONG DIST. 9
ROW
AFTER 97
PROJECT MILEAGE: 2.23
CONST
AFTER 97
MANAGER: L. OWENS(M)
..
FUND SOURCE: SURFACE TRANSPORT.
STATUS: REQ CLEVELAND DO UTIL 9-30-91; ~~Tft,mv
FEDERAL HIGHWAY ADMIN FUNDS
WHITE 141830
STATUS:
SR 384/DUNCAN BRIDGE RD FM W ADDITION OF A PASSING LANE. PROJECT MILEAGE: 7.32 MANAGER: L. OWENS (M)
SEND LGPA WHEN PROJECT, . /i(f'.i(i(,)1:/:0YTO
WHITE 162390
STATUS:
CLEVELAND WEST BYP
CONSTRUCTION OF NEW PROJECT MILEAGE: 1.80 MANAGER: J. GARLAND (M) SEND LGPA WHEN PROJECT IS .,...,v~,~,,.~~
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE
ROW CONST
$
140
AFTER 97
~TER 97
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE .1996 ROW LOCL CONST
$
90
AFTER 97
WHITE 170881
STATUS:
CS 613/LORELY RD OVER CHATTAHOOCHEE RIVER IN REPLACEMENT OF THE EXISTING BRIDGES(S). FROM PROJECT MILEAGE : .19 MANAGER: L. OWENS WHITE REFUSED 5-17-92; HELEN SGN 3-4-93
~ONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
WHITE. 171020
STATUS:
o]I :~~~~t:~c;~,~~E; i=~~:-0. REHAB, ilANosCAPING ::::
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES: {i):i)/(?
MANAGER: JANET HARVEY ~GPA TO BE DONE BY CONTRACT
.c.. ''
'::.
FUNoiowct: TRANS. ENHAildL
::tt'I:GHWAY ADMIN)tui-ios
WHITE 171155
STATUS:
STOVALL MILL COVERED BR OVER CHICKAMAUGA CK ADJACENT-SR 255
BRIDGES/ ENHANCEMENT PROJECT MILEAGE: .00 MANAGER: UNKNOWN DOT ~ILL PROVIDE THE 20% MATCH
FUND SOUR~j':} ~.AANS . ENHANCE. FEDERAL ,.JttGHi'lAY ADMIN
PE 1993 UNDERWAY
ROW LOCL
CONST 1997 $ 306
FED SHARE$ 245
GA. SHARE$
61
0TH SHARE$
PE
$
20
ROW 1997 $ 250
CONST 1997 $ 442
FED SHARE$ 354
GA. SHARE$
54
0TH SHARE$ 142
PE NONE $
0
ROW NONE
$
0
1995 . $
47
FED SHARE$
38
GA. SHARE$
9
0TH SHARE$
= =
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997.
COMMENTS
BALDWIN 222180
STATUS:
SR 22/24 RELOC FM CR 171 EAST TO SR 22/:1~ SPLIT CONSTRUCTION OF NEW ROUTE WITH 4 LANES PijQPOSED. PROJECT MILEAGE: 3.10 MANAGER: B FERGUSON (M)SEND LGPA IN 1997
CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
BALDWIN 241670
STATUS:
BALDWIN 242290
STATUS:
@'tkWt CR 470/PANCRAS ROAD
CREEK 6 MI SW OF MILLEti!iYii~E
REPLACEMENT OF THE EXIST.J:ijG BRIDGES (S) NO ADDED,/LANES\
PROJECT MILEAGE : .21
- .:::::.::::::
MANAGER: D. GRIFFITH (M) SEND LGPA IN 1995
CONG DIST. 11 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
BALDWIN 270950
STATUS:
PRESERVATION OF HISTORIC DISTRICT IN MILLEDGEVILLE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0
MANAGER: C. HAMILTON LGPA TO BE DONE BY CONTRACT
DIST. 11
SOURCE: TRANS. ENHANCE. HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 1
FISCAL YEAR
COST ESTS
PE 1995 ROW 1997
CONST
$
168
$ 2272
AFTER 97
PE 1993
UNDERWAY
ROW 1994
$
2
CONST 1995
$
142
FED SHARE $
128
GA. SHARE $
14
0TH SHARE $
PE 1995
$
11
ROW LOCL
CONST 1997
$
550
FED SHARE $
440
GA. SHARE $
110
0TH SHARE $
PE 1995 $
21
ROW 1995
$
44
CONST 1995
$
74
FED SHARE $
59
GA. SHARE $
13
0TH SHARE $
28
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
. COMMENTS
BLECKLEY SR 87/US 23 IN COCHRAN@ SOUTHERN RR 221130 REPLACEMENT OF THE EXISTING BRIDGES($).
PROJECT MILEAGE: .30 MANAGER: D. GRIFFITH
STATUS: LGPA SIGNED BY CITY 3-13-85
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
BLECKLEY SR 87 FM SR 112 TO SR 96 IN 222070 RECONSTRUCTION & WIDENING
PROJECT MILEAGE: 8.00 MANAGER: B FERGUSON (M)
STATUS: BLECKLEY SGN 4/91 UTIL;
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 2
FISCAL YEAR
COST ESTS
PE 1985 UNDERWAY
ROW 1988 UNDERWAY
CONST 1995
$ 1006
FED SHARE $
805
GA. SHARE $
201
OTS SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY $ 494 AFTER 97
BLECKLEY SR 87 FM SR 257 NW 222360 RECONSTRUCTION &
PROJECT MILEAGE: 2.50 MANAGER: B FERGUSON (M) STATUS: SEND LGPA WHEN PROJECT IS
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW CONST
$
90
AFTER 97
AFTER 97
BLECKLEY SR 112 : OVER BOLLINGER CREEK 242160 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE: .00
MANAGER: D. GRIFFITH (M)
STATUS: SEND LGPA IN 1996
DIST, 8
FUND SOURCE: BRIDGE PROGRAM F.li:.DERAL. HIGHWAY ADMIN FUNDS
PE 1995
ROW 1997 CONST.
$
10
$
1
AFTER 97
BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl089 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH . STATUS:
BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl090 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH STATUS:
BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2089 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
; 1:~i: DIST. 8. }
FUND SOURcfr~~~ TRANSIT
rED!i:~ f~siT ADMIN
CONG::!~::
FUND SOURCE: FEDERAL TRANSIT
22
1996
$
58
FED SHARE$
34
GA. SHARE$
0TH SHARE$
24
CAPITAL 1995
$
21
FED SHARE$
17
GA. SHARE$
2
. 0TH SHARE $
2
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2090 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 3
FISCAL YEAR
COST ESTS
CAPITAL 1996
$
21
FE.D SHARE $
17
GA. SHARE$
2
0TH SHARE$
2
GEORGIA DEPARTMENT OF TRANSPORTATION
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 4
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
B-UP-R-.IK-.E-N-O--. -S-R--1-2-1-/-U-S--2-5---PF-MR-O-CJ-ER-C-T1-6-D-AT-OT-A-C-R--1-1-8-/-S-E-E----=-1u-~-,-,~-~----------------------------C-O-M-M--E-N-TS---------------------------PE-Y-EA-1-R9-9-4-----U-NE-DS-ETR-SW--AY
22255X UNKNOWN/ UNKNOWN
CONG DIST. 11
ROW 1996
$
0
PROJECT MILEAGE: .00 - EXIST. LANES: 0
GRIP PROJECT
CONST
AFTER 97
MANAGER:
FUND SOURCE: GOVERNOR'S RD IMP PROGRAM
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
BURKE 231260
STATUS:
SR 24 WB MP 22-23.3/EB24.3-25. ADDITION OF A PASSING LANE. PROJECT MILEAGE : 5.40 MANAGER: D. GRIFFITH (M) SEND LGPA WHEN PROJECT
CONG DIST. 11
FUND SOURCE: S_URFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE ROW CONST
$
81
AFTER 97
AFTER 97
BURKE 23156X
STATUS:
SR 78/US 319 FM SR
RIDING SURFACE PROJECT MILEAGE : 14.20 MANAGER: L. SEABROOK
BURKE 2Bl094
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH
BURKE 2Bl095
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS
.
FUNDS RECIPIENT: BURKE
MANAGER: STEVE KISH
BURKE 2C2094
STATUS:
TWO STANDARD VANS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH LGPA NOT APPLICABLE
BURKE 2C2095
_STATUS:
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH LGPA NOT APPLICABLE
PE NONE $
0
ETC.CONG DIST. 11
ROW NONE
$
0
CONST 1995 $
0
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
DIST. 11
OPERATING 1995
$
71
FUND SOURCE: RURAL TRANSIT
FED SHARE$
42
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE$
29
i!i !:i:!;~G
'<;iffi; ~J~ SOURcti
TRANSIT
FEDERAL.TRANSIT ADMIN
CONG DIST. ':::11
FUND SOURCE: FEDERAL
75 44
31
1995
$
40
FED SHARE$
32
GA. SHARE$
4
0TH SHARE$
4
CAPITALl996
$
32
FED SHARE$
:--26
GA. SHARE$
3
0TH SHARE$
3
---=
=
Q1S.C..Tt!1il
~
,---,..,
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COLUMBIA I-20@ WHEELER RD/SEE RICHMOND CO 21049X INTERCHANGE/ NEW CONSTRUCTION
PROJECT MILEAGE : .00 - EXIST .. LANES: MANAGER: NEIL DAVIS STATUS:
LANES: 0
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 210490 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 5
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
COLUMBIA I-20 REST AREA #62 & 63 210565 REST AREA/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: J. GARLAND (C) STATUS: COLUMBIS COUNTY SIGNED
CONG DIST. 10
0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1997
$ 1681
FED SHARE $ 1513
GA. SHARE $
168
0TH SHARE $
COLUMBIA SR 232 WB MP 2.5-3.6; 221410 ADDITION OF A PASSING
PROJECT MILEAGE : 2.40 MANAGER: D. GRIFFITH STATUS: CO SGN UTIL 4-4-91; PROJECT
AUGUSTA TIP# GI006 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$ 2800
FED SHARE $ 2240
GA. SHARE $
560
0TH SHARE $
COLUMBIA SR 104 FM MP 8.95 S OF CR 221805 RECONSTRUCTION & WIDENING
PROJECT MILEAGE : 3.00 MANAGER: B FERGUSON STATUS: COLUMBIA COUNTY SGN FOR UTILITIES
AUGUSTA TIP# CC-076
fONG DIST. 10
'.:/)(t:'.
.
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS
COLUMBIA SR 28/FURYS FERRY RD FM RIVERWATCH PKWY TO CR J'JiRICHMOND 221860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
STATUS: ~~!!~:~:Ei~~Ri~:i~L COLUMBIA SGN 3-17-92 FOR UTILIT~~ij!?
ii%~ogs~;)1i~ RC-CC-048
~:~: tbl:MBi: SURFACE TRlilii~okF:< FEDE~)hGHWAY Ari~rn fu~os
PE 1992 ROW.1996 CONST
UNDERWAY $ 1392 AFTER 97
PE 1992
UNDERWAY
ROW 1996
$ 2164
CONST 1997
$ 5174
FED SHARE $ 4139
GA. SHARE $ 1035
0TH SHARE $
COLUMBIA SR 28/FURY'S FERRY RD@ BASTON RD/VAUGHN RD 222230 INTERSECTION IMPROVEMENT/ RECST. OR REHAB.
PROJECT MILEAGE : .43 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: D. CHURCH STATUS: CO SGN 3/92 PE/UTIL/ROW/50% STORE; AUGUSTA NO UTIL INVOLVED
PE LOCL
ROW 1993 UNDERWAY
FUND
SOURcii'sifRFACE
. .. :':"::'::CONST 1995
TRANsPdk@Yf
FED SHARE
$ $
FEDERAL .it:i:GRWAY ADMIN FUNDS ../ ..'/:' . .
GA. SHARE $
2443 1954
489
0TH SHARE $
COLUMBIA SR 47 SB FRM MP 2.45 NEAR KEG CREEK SOUTH TO MP 3.88 231350 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 1.43 MANAGER: D. GRIFFITH (M) STATUS: SEND LGPA IN 1996
CONG DIST. '',10 FUND SOURCE: SURFJ&li ~SPORT.
FEDERAL HIGHWAY Ab~:hf FUNDS
PE 1995
RO.W 1997 CONST
$
23
$
73
AFTER 97
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COLOMBIA SR 104/WASHINGTON RD@ CLUB CAR DRIVE 231370 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .30 - EXIST, LANES: MANAGER: D. GRIFFITH STATUS: COLUMBIS COUNTY SIGNED FOR UTILITIES
AUGUSTA TIP lt CC-076 CONG DIST. 10
5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
COLUMBIA SR 223, MP 3.98: 6.5: 242210 BRIDGES/ MAINTENANCE
PROJECT MILEAGE : .. 00
MANAGER: L. SEABROOK
STATUS: NOT APPLICABLE
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COLOMBIA SR 383/BELAIR RD FM 25032X. RECONSTRUCTION &
PROJECT MILEAGE : ,00 MANAGER: D. CHURCH STATUS: LGPA NOT APPLICABLE
co .<:::\::::::
AUGUSTA TIP lt RC-CC-207 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 250320 IS AN ASSOCIATED PROJECT.
.?!\~ COLOMBIA CR 145 FM BASTON TO RIVERWATCH PK;BASTON FM SR 104
N'l
250475 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES</ ,: ,: .
~=~~ PROJECT MILEAGE: .40
STATUS:
gOU~~~R~~GNED 3-3-92 FOR ROW AND :UTIIif~~j:/
?\:AUGUSTA TIP JI CC-7063 }//ii;oNG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. F...E...D:ERAL. HIGHWAY ADMIN FUNDS
COLU'MBIA SR 104 FM CR 91/SCOTTS WAY NW TO E/CR 515 (INc:t'\~RIDGES) 262080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 2.21
MANAGER: B FERGUSON
STATUS: COLUMB+A COUNTY SIGNED FOR UTILITIES 11-19-91.
AUGUSTA Tfi(Jt CC-076 I PONG DIS";Ci)fo
FUNo'.$6~'t: SU~!l,CE T~$~6%f>
FEDERAt,ltIGHWAY Ab~J.~F\J~pS
22-Feb-1994
Page 6
FISCAL YEAR
COST ESTS
PE i994
UNDERWAY
ROW LOCL
CONST 1995
$
110
FED SHARE $
99
GA, SHARE .$
11
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
27
FED SHARE $
22
GA. SHARE $
5
0TH SHARE $
PE 1992 UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1993 UNDERWAY ROW LOCL
CONST 1995 $ 3073 FED SHARE $ 2458 GA. SHARE $ 615 0TH SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY $ 1995 AFTER 97
COLUMBIA CR 136/BASTON RD FM CR 145 N TO SR 28/MARTINEZ 262410 RECONSTRUCTION & WIDENING FROM 2 LANES T.O 4 LANES.
PROJECT MILEAGE: .72 . MANAGER: D. CHURCH . STATUS: COLUMBIA COUNTY SIGNED 3-3-92 F.OR ROW AND UTILITIES.
COLUMBIA CULVERT EXTENSIONS AT VARIOUS LOCATIONS 270860 BRIDGES/ MAINTENANCE
PROJECT MILEAGE : .00 MANAGER: L. SEABROOK STATUS: NOT APPLICABLE
itik6 souRciiT'iJt;AcE TRANSP<:ikfL
FEDERAL.FliGk~AY ADMIN FUNDS . :.:.:::i
PE 1992 . UNDERWAY
ROW LOCL
''//CONST 1995
$
505
FED SHARE $ .404
GA. SHARE $
101
CONG~~~:
FUND SOURCE: SURFACE f~sPORT.
FEDERAL HIGHWAY ADMIN FUNDS
R~;T;g;;-; 0
0
CONST 1995 $ 179
FED SHARE$ 143
GA. SHARE$
36
0TH SHARE$
,,
= =
~
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl099 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH STATUS:
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
COLUMBIA COUNTY OPERATED PUBLIC TRANSIT 2Bll00 TRANSIT FACILITIES/
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH STATUS:
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
COLUMBIA ONE STANDARD VAN AND 2C2099 rRANSIT FACILITIES/
FUNDS RECIPIENT: MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 7
FISCAL YEAR
COST ESTS
OPERATING 1995 $
47
FED SHARE $
28
GA. SHARE $
0TH SHARE $
19
OPERATING 1996 $
49
FED SHARE $
29
GA. SHARE $
0TH SHARE $
20
CAPITAL 1995
$
21
FED SHARE $
17
GA. SHARE $
2
0TH SHARE $
2
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
"PROJECT LISTING BY C_OUNTY FY 1995/FY 1997
COMMENTS
DODGE 231340
STATUS:
SR 27@ SR 87, SECOND SIGNALS/ SAFETY
PROJECT MILEAGE : .so -
MANAGER: D. GRIFFITH EASTMAN SGN 8-26-92 FOR UTILITIES
3 T&S
CONG DIST. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
DODGE 2Bll04
STATUS:
COUNTY OPERATED PUBLIC TRANSIT FACILITIES/ FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
DODGE 2Bll05
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
DODGE 2C2104
STATUS:
ONE CONVERSION VAN AND ONE MOBILE TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 8
SOURCE: RURAL TRANSIT TRANSIT ADMIN FUNDS
22-Feb-1994 Page 8
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW 1994
$
5
CONST 1995
$
150
FED SHARE $
150
GA. SHARE $
0TH SHARE $
OPERATING 1995
$
79
FED SHARE $
47
GA. SHARE $
0TH SHARE $
32
OPERATING 1996
$
84
FED SHARE $
50
GA. SHARE $
0TH SHARE $
34
CAPITAL 1995
$
30
FED SHARE $
24
GA. SHARE $
3
0TH SHARE $
3
..
,,
~
=i;!
COUNTY P .I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
EMANUEL 222210
STATUS:
SR 26/SWAINSBORO@ SOUTHERN RR/REMOVE BRIDGE REMOVAL/ NEW CONSTRUCTION PROJECT MILEAGE : .42 - EXIST. LANES: MANAGER: D. GRIFFITH (M) REQ SWAINSBORO DO UTIL 12/91;
GRADE XING
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 9
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1995
$
60
CONST 1997
$ 1382
FED SHARE $ ll06
GA. SHARE $ 276
0TH SHARE $
EMANUEL 231130
STATUS:
SR 46_@ JACKS CREEK 1 MILE
REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH EMANUEL COUNTY SIGNED
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1995
$ 878
FED SHARE $ 702
GA. SHARE $
176
0TH SHARE $
EMANUEL 231380
STATUS:
SR 57/KITE RD@ INTERSECTION TMPR<~Vl~MI~~~~//
PROJECT MILEAGE : .36 MANAGER: D. GRIFFITH SWAINSBORO SGN 10-5-92 FOR
CONG DIST. l
3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW 1994 UNDERWAY
CONST 1995 $ 267
FED SHARE $ 240
GA. SHARE $
27
0TH SHARE $
EMANUEL 2Bll09
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
OPERATING 1995 $
33
FED SHARE$
19
GA. SHARE$
0TH SHARE$
14
EMANUEL 2Blll0
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH
.OPERATING 1996 $
34
FED SHARE$
20
GA. SHARE$
0TH SHARE$
14
EMANUEL. 2C2109
STATUS:
ONE STANDARD VAN AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: EMANUEL
MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 1.
FUND soui:~cifi
FEDERAL ..TruiliSIT
1997
$
21
FED SHARE$
17
GA. SHARE$
2
0TH SHARE$
2
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GLASCOCK COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1114 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH STATUS:
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
GLASCOCK COUNTY OPERATED PUBLIC TRANSIT 2B1115 TRANSIT FACILITIES/
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH STATUS:
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 10
FISCAL YEAR
COST ESTS
OPERATING 1995
$
34
FED SHARE $
19
GA. SHARE $
0TH SHARE $
15
OPERATING 1996
$
35
FED SHARE $
20
GA; SHARE $
0TH SHARE $
15
"
=
=
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GREENE 221360
STATUS:
SR 12/GREENSBORO FM WALNUT ST TOE OF EAST GREENE ST
RECONSTRUCTION & WIDENING FROM 2 LANES TO\} LANES.
PROJECT MILEAGE : .39
MANAGER: D. GRIFFITH COUNTY SIGNED 6/6/88 FOR ROW AND
CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 221610 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 11
FISCAL YEAR
COST E_STS
PE 1992 UNDERWAY
ROW 1994 UNDERWAY
CONST 1995 $ 500
FED SHARE $
450
GA. SHARE $
50
0TH SHARE $
GREENE 221610
STATUS:
sR 12/GREENSBORO FM E oF EAST GRiil ~~>;o EB PA~J:~G LANE
i. ~~ ' ~= M;~A~NA~G~E~R:iLD'A. ~GR!cIF~FTITH ~E~s. ..4..i.. .
2 /PROPOSED ~Es= 3
,,,,,,,,,,,,c:c,,,.
REQ co Do Row & uTIL 12-2eJJ/8Ff~ sGN 3-21-90 Row, :9.fiL.
CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 221360 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1994 UNDERWAY
CONST 1997
$
937
FED SHARE $ 843
GA. SHARE $
94
0TH SHARE $
GREENE CR 38 @ RICHLAND CRE~k : (
270680 REPLACEMENT OF THE EXIS'.l'ING BRIDGES(S). NO ADDEQWE:S.
~Ei!~:i::;~iit~tr STATUS:
~OW, ~~~::RS jak 6-1~90
t UT_Il~Irti~:
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1991 UNDERWAY
ROW LOCL
CONST 1997 $ 156
FED SHARE$ 125
GA. SHARE$
31
0TH SHARE$
GREENE 270681
STATUS:
CR 66/LESLIE MILL RD@ BEAVERDAM CRK REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .25 MANAGER: D. GRIFFITH GREENE COUNTY SIGNED 6-1-90 FOR ROW,
DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1997 $ 196
FED SHARE$
157
GA. SHARE$
39
0TH SHARE$
GREENE 270870
STATUS:
CULVERT EXT@ VAR LOC ON STATE ROUTES .. OGLET/T.AiIF BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK NOT APPLICABLE
PE NONE $
0
r::::coNG DisiSfa
ROW NONE $
0
CONST 199.5 $ 211
FUND:166RcE: SURFACE T~s~6Rf.<
FEDl!:RAi.:iiiGHWAY ADMIN f@6s
\
27087X is AN ASSOCIATED'l?ROJECT. )
FED SHARE$
169
GA. SHARE$
42
0TH SHARE$
GREENE 2B1119
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GREENE MANAGER: STEVE KISH
.-:
'\)cc:JNG DIST. 11/:
FUND SOURCg;::IJt:r. TRANSIT
FEDERAL TRANsiT
1995 $
81
SHARE$
47
GA. SHARE$
0TH SHARE$
34
GREENE 2B1120
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GREENE MANAGER: STEVE KISH
CONG DIST. \11
FUND SOURCE: FEDERAL TRANSIT
OPERATING 1996 $
86
FED SHARE$
50
GA. SHARE$
0TH SHARE$
36
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GREENE 2C2119
STATUS:
ONE CONV. VAN/LIFT, ONE STANDARD TRANSIT FACILITIES/ CAPITAL FUNDS~RECIPIENT: GREENE MANAGER: STEVE KISH LGPA NOT.APPLICABLE
CONG DIST . 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 12
FISCAL YEAR
COST ESTS
CAPITAL 1995
$
54
FED SHARE$
43
GA. SHARE$
6
0TH SHARE$
5
., .J ' l
-===-
~
~
~:
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HANCOCK 22230X
STATUS:
SR 15: NB MP-28.1-29.6/WASHINGTON/SB ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.00 MANAGER: UNKNOWN
.0-2.5/HANCOCK CO
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 222300 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 13
FISCAL YEAR
COST ESTS
PE 1995 ROW CONST
$
0
AFTER 97
AFTER 97
HANCOCK 231310
STATUS:
SR 15 OVER COPELAND CREEK .REHABILITATION OF THE PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH (M) SEND LGPA IN 1995
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 231330 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW 1996
$
6
CONST 1997 $ 250
FED SHARE $
200
GA. SHARE $
50
0TH SHARE $
HANCOCK SR 15 OVER WHITTEN 231330 BRIDGES/ RECST. OR
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH (M) STATUS: SEND LGPA IN 1995
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 231310 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW 1995
$
6
CONST 1996
$
285
FED SHARE $
228
GA. SHARE $
57
0TH SHARE $
HANCOCK 270990
STATUS:
SHOULDERBONE INDIAN MOUND/HISTORICAL RIGHTS-OF-WAY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: C. HAMILTON LGPA TO BE DONE BY CONTRACT
HANCOCK 2Bl124
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH
DIST. 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
-:::::: ..
PE NONE
$
0
ROW 1997
$
800
CONST NONE
$
0
DIS]Ii~l
1BtffiBk: FUN;
RURAL
TRANsiJ':'t(t'
9 ::_oPERATrn~E~ ~~ARE
~
5632
FEDERALTRANSIT ADMIN:iFtmOS
GA. SHARE$
0TH SHARE$
23
HANCOCK 2B1125
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH
HANCOCK 2C2124
STATUS:
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH LGPA NOT APPLICABLE
':'::'cc:>NG
''<;{ffif; souRcli'i@.AL TRANSIT FEDERAL :TRANSIT ADMIN
CONG::!(,
FUND SOURCE: FEDERAL TRANSIT
1996 $
59
FED SHARE$
34
GA. SHARE$
0TH SHARE$
25
CAPITAL 1995
$
33
FED SHARE$
26
GA. SHARE$
4
0TH SHARE$
3
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
HANCOCK 2C2125
STATUS:
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH LGPA NOT APPLICABLE
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 14
FISCAL YEAR
COST ESTS
CAPITAL 1996
$
33
FED SHARE$
26
GA. SHARE$
4
0TH SHARE$
3
,I
.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
JASPER 231520
STATUS:
SR 16@ SR 212 EAST OF MONTICELLO INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .25 - EXIST. LANES: MANAGER: D. GRIFFITH SEND LGPA IN 199
CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 15
FISCAL YEAR
COST ESTS
PE 1994
$
11
ROW 1995 $
12
CONST 1996 $ 371
FED SHARE$
334
GA. SHARE$
37
0TH SHARE$
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATlv;i DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
JEFFERSO SR 24/US 221 EB MP 12.6-13.8;WB 10.0-ll>,3;EB 3.2-4.3 231230 ADDITION OF A PASSING LANE.
PROJECT MILEAGE: 3.60 MANAGER: D. GRIFFITH (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS .
22-Feb-1994 Page 16
FISCAL YEAR
COST ESTS
PE ROW CONST
$
83
AFTER 97
AFTER 97
JEFFERSO SR 24 WB MP 22-23.3/EB 24.3-25.6}t-Wl!:i~f30.3&37-1.t/~~JRKE
o - st\ ' o o 23126X ~:~~~ ,I~~:~wi: 5 4
EX I
1
:t.Mds: /PROPOSED ~Es:
MANAGER: UNKNOWN
STATUS:
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 231260 IS AN ASSOCIATED PROJECT.
PE ROW CONST
$
0
AFTER 97
AFTER 97
JEFFERSO 231560
STATUS:
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1995
$
692
FED SHARE$
554
GA. SHARE$
138
0TH SHARE$
bmi~;- JEFFERSO RESTORE OLD MARKET HOUSE ON BROAD STREET/LOUISVILLE,
270980 ~~~~~~~~~iGiM~R~~~N~!I~T~N~i~i;ra~T/PROPOSEP.
0
MANAGER: C. HAMILTON
STATUS: LGPA TO BE DONE BY CONTRACT
FUND SOURCE: TRANS. ENHANCE.
{:::;:r FED.ERAL HIGHWAY ADMIN FUNDS
>:
PE LOCL
ROW NONE $
0
CONST 1996 $ 170
FED SHARE$
136
GA. SHARE$
0TH SHARE$
34
1
JEFFERSO COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll29 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: JEFFERSON MANAGER: STEVE KISH
STATUS:
\CONG DIST:; 1
;:~ 18Uk2[ > RURAL TRANsJ?
9 PPERATIN;E~ ~~ARE :
82 47
FEDEifil,,i.TRANSIT ADMIN
GA. SHARE$
0TH SHARE$
36
JEFFERSO COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll30 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: JEFFERSON MANAGER: STEVE KISH STATUS:
fl~tt: ~IST. um:~!ll'";
souRci{lkJfu TRANSIT
ADMIN
1996 $
87
FED SHARE$
50
GA. SHARE$
0TH SHARE$
38
JEFFERSO ONE STANDARD VAN AND ONE MOBILE RADIO 2C2129 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: JEFFERSON MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
CONG DIST. i,11
FUND SOURCE: FEDERAL
CAPITAL 1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
. ,
~
ta~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
JENKINS 221640
STATUS:
SR 23/US 25 @OGEECHEE RIVER SOUTH OF REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: K FULBRIGHT (M) REQ JENKINS COUNTY DO UTILITIES_
2 TO 4 LANES.
CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221645 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 17
FISCAL YEAR
COST ESTS
PE 1996 ROW NONE CONST
$
195
$
0
AFTER 97
JENKINS 221645
STATUS:
US 25@ OGEECHEE RIVER OFLW REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: K FULBRIGHT (M) REQ JENKINS COUNTY DO
CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221640 IS AN ASSOCIATED PROJECT.
PE 1996 ROW NONE CONST
$
36
$
0
AFTER 97
JENKINS .2B1134
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: JENKINS MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1995 $
32
FUND SOURCE: RURAL TRANSIT
FED SHARE $
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
14
JENKINS 2B1135
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JENKINS MANAGER: STEVE KISH
DIST. 11
OPERATING 1996 $
33
SOURCE: RURAL TRANSIT
FED SHARE $
18
TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
14
JENKINS 2C2134
STATUS:
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE TRANSIT FA_CILITIES / CAPITAL FUNDS RECIPIENT: JENKINS MANAGER: STEVE KISH LGPA NOT APPLICABLE
1995
$
33
FED SHARE$
26
GA. SHARE$
4
0TH SHARE$
3
COUNTY P,I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY -1995/FY 1997
COMMENTS
LAURENS 210500
STATUS:
I-16@ SR31/US 441 IN DUBLIN & INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : ,56 - EXIST, MANAGER: J. GARLAND REQ LAURENS DO UTIL 3-23-92; DUBLIN
CONG DIST. 8
4
GRIP PROJECT
FUND SOURCE: I-STATE MAINT.
FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 18
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1994
$
200
CONST 1995
$ 1642
FED SHARE $ 1478
GA. SHARE $
164
0TH SHARE $
LAURENS 210650
STATUS:
I-16 ACROSS OCONEE RIVER AND BRIDGES/ RECST, OR REHAB. PROJECT MILEAGE : 2.22 MANAGER: GENE POWELL (M) REQ LAURENS COUNTY DO
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1996
$ 6195
FED SHARE $ 5576
GA. SHARE $
620
0TH SHARE $
LAURENS I-16 AT TURKEY CK,
210660 BRIDGES/ RECST. OR
PROJECT MILEAGE : .00
MANAGER: GENE POWELL (M)
STATUS: REQ LAURENS COUNTY DO
i{t::
LAURENS 221810
s-id~j ~/;ii SR 19/DUBLIN FM MULTI-LN @ INDUSTRIAL BLVD NW TO
RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES,::}((\/::,:-:-
PROJECT MILEAGE : 1. 92
...
STATUS: =A~~~!/~~B~~~~i-Jg\UBLIN SGN 2/l/9ltc:J;TY: ~$ff;IES
CONG DIST. 8 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
60NG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. - FED.ERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW ,NONE
$
0
CONST 1996
$ 1261
FED SHARE $ 1135
GA. SHARE $
126
0TH SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY
$
145
AFTER 97
LAURENS 221820
STATUS:
1
SR 29/US 441 FM NORTHVIEW AVE TO 600' N/TE~:: 11:RIVE&BRID~E . _RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.56 MANAGER: K FULBRIGHT REQ .CO DO UTIL 9-5-90; CITY/DUBLIN SIGNED 9/14/90-UTILITt~
PE 1992
UNDERWAY
-ROW 1992
UNDERWAY
CONST 1996
$ 2210
FED SHARE $ 1768
GA. SHARE $
442
0TH SHARE $
LAURENS 222010
STATUS:
SR 117@ BAY CREEKS/CADWELL REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .10 MANAGER: D. GRIFFITH LAURENS COUNTY SIGNED 5-17-91 FOR UTILITIES.
LAURENS 271000
STATUS:
NATHANIEL DRIVE FROM SR 26 TO SR 199 IN EAST DUBLIN RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.42 MANAGER: D. GRIFFITH (M) SEND LGPA IN 1994 TO LAURENS & EAST DUBLIN FOR ROW & UTI~
tb:>NG DIST.
-;{fuo SOURCi}: }1%GE PROGRAM
FEDE~:.~:r,m~Ar ADMIN
?)_.
CONG DIST :-:::::8
FUND SOURCE: FEDERAL HIGHWAY
PE 1993 UNDERWAY
ROW 1993 :-,:;::::::.::(ci)NS:T 19 9 5
UNDERWAY
$
201
FED SHARE $
161
GA. SHARE $
40
0TH SHARE $
PE 1995 ROW LOCL CONST
$
100
AFTER 97
.. - "
=- ~ .
.
GEORGIADEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 19
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
----------------------------------------------------------------------------------------------------------------------------------
LAURENS COUNTY OPERATED PUBLIC TRANSIT SERVICE
2Bll44 TRANSIT FACILITIES / OPERATION_S
CONG DIST. 8
FUNDS RECIPIENT: LAURENS
OPERATING 1995
$
64
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE $
36
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
27
LAURENS 2Bll45
STATUS:
COUNTY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: LAURENS MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1996
$
67
FUND SOURCE: RURAL TRANSIT
FED SHARE $
38
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
29
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
LINCOLN 231360
STATUS:
SR 47 SB FM MP 8.28-9.22; NB MP 0.93-2.28 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.29 MANAGER: D. GRIFFITH (M) SEND LGPA WHEN PROJECT IS ADDED TO
CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 20
FISCAL YEAR
COST ESTS
PE ROW CONST
$
37
AFTER 97
AFTER 97
LINCOLN 242220
STATUS:
CR 262/WOODLAWN ROAD @ LLOYD CREik/dJB:' SW OF LINt6iNTON
REPLACEMENT OF THE EXISTING BRtPGE$JSj. NO ADDED LANES.
~~g~:= J! PROJECT MILEAGE : 20
..,{....... .........
' i i / / ..
1
.)8k cgtm~~I;i~~:D <~t.,2f~~
ROW, UTILITIES & ibuRs
LINCOLN 262450
STATUS:
~?;[ ~;::~~ cR 63/PETERsBuRG
N To sR 43 NEAR LINcof~~l~:
RECONSTRUCTION & WIDENING( NO LANE ADDITION PROJ?Q.SE6}
8 ~~i~:M~~E~:~F;Iiii ~Ml ;:
SEND LGPA WHEN PROJECT IS ADD~D/I'Q. CWP
CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW LOCL
CONST 1996 $ 271
FED SHARE $ 217
GA. SHARE $'
54
0TH SHARE $
PE 1995 ROW LOCL CONST
$
10
AFTER 97
LINCOLN COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl149 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: LINCOLN 'MANAGER: STEVE KISH
STATUS:
LINCOLN 2B1150
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH
LINCOLN 2C2149
STATUS:.
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 10
OPERATING 1995 $
27
SOURCE: RURAL TRANSIT
FED SHARE$
16
~-~~l<,11,~. TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
11
OPERATING 1996 $
27
RURAL TRANS! /
FED SHARE$
16
ADMINFUNDS
GA. SHARE$
0TH SHARE$
11
DIST. lq lj)
~Jk . SOU~F.i
TRANSIT
FEDE~_,,':l:'BJWSIT ADMIN
1995
$
20
FED SHARE$
16
GA. SHARE$
2
0TH SHARE$
2
"
~I
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
MADISON 27102X
STATUS:
WATSON MILL COVERED BRIDGE BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER: UNKNOWN
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
RVR;OGLETHORPE
CONG DIST. 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 21
FISCAL YEAR
COST ESTS
PE NONE $
0
ROW NONE
$
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
COUNTY P. I.NO.
DESCRIPTION . PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY.1997
COMMENTS
MCDUFFIE CR 308 NW OF THOMSON@. MIDDLE CREEK 231180 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH STATUS: McDUFFIE SGN FOR ROW, UTILITIES &
LANES.
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 231182 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 22
FISCAL YEAR
COST_ ESTS
PE 1993
UNDERWAY
ROW LOCL
CONST 1995
$
347
FED SHARE $
278
GA. SHARE $
69
0TH SHARE $
MCDUFFIE CR 308 NORTH OF THOMSON@ 231182 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH
STATUS: McDUFF.IE SGN TO DO ROW,_c:,:,:;,,t,.)Jc,:/:,)'"'.1:."
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 231180 IS AN ASSOCIATED PROJECT.
PE 1993
UNDERWAY
ROW LOCL
CONST 1995
$
211
FED SHARE $
169
GA. SHARE $
42
0TH SHARE $
MCDUFFIE ORIG. TOWN OF 270970 SIGNING/ ENHANCEMENT
PROJECT MILEAGE : .00 MANAGER: C. HAMILTON STATUS: LGPA TO BE DONE BY CONTRACT
CONG DIST. 10 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE
$
0
CONST 1996
$
31
FED SHARE $
25
GA. SHARE $
0TH SHARE $
6
MCDUFFIE COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll54 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MCDUFFIE MANAGER: STEVE KISH STATUS:
OPERATING 1995
$
70
FUND SOURCE: RURAL TRANSIT
FED SHARE$
40
.F'.EDE~. TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
30
MCDUFFIE COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll55 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MCDUFFIE MANAGER: STEVE KISH STATUS:
Dis'.f:i1 0
F=~\:iaill{8k; RURAL TRANsri :::
FEDERAL' TRANSIT ADMIN. FUNDS'
$
73
SHARE$
42
GA. SHARE $
0TH SHARE$
31
MCDUFFIE ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO 2C2154 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: MCDUFFIE MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
:!a~:G DIST.
. FUND SOURCE; k&fu TRANSIT
FEDERAL ,TRANSIT ADMIN
1995
$
33
FED SHARE$
26
GA. SHARE$
4
0TH SHARE$
3
oa==
=
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MORGAN 210560
STATUS:
I-20 REST AREA f52 & 53
REST AREA/ RECST. OR REH~. PROJECT MILEAGE : . 00 - EXIST. LANES:
MANAGER: J. GARLAND (C) DOT TO PAY 1-21-94
LANES: 0
CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS
22-Feb-1994 Page 23
FISCAL YEAR
COST ESTS
PE 1993 ROW 1996 CONST
UNDERWAY
$
80
AFTER 97
MORGAN 222030
STATUS:
SR 83@ HARO LABOR CRK REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH MORGAN COUNTY SIGNED
MORGAN 2Bl159
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH
MORGAN 2Bl160
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH
MORGAN 2C2159
STATUS:
ONE STANDARD VAN ANO ONE MOBILE RADIO TRANSIT FACILITIES./ CAPITAL FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH LGPA NOT APPLICABLE
MORGAN 2C2160
STATUS:
ONE STANDARD VAN ANO ONE MOBILE RADIO TRANSIT. FACILITIES / CAPITAL FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
UNDERWAY
CONST 1995 $ 1075
FED SHARE $
860
GA. SHARE $
215
0TH SHARE $
CONG DIST. 10
OPERATING 1995
$
53
FUND SOURCE: RURAL TRANSIT
FED SHARE $
30
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE $
0TH SHARE $
23
DIST. 10
OPERATING 1996
$
57
SOURCE: RURAL TRANSIT
FED SHARE $
32
TRANSIT AOMIN FUNDS
GA. SHARE $
0TH SHARE $
25
....:::.::=::,::_CAP ITAL 1995
$
21
RURAL TRANSIT : ..
ADMIN:FtrNos
FED SHARE$
17
GA. SHARE $
2
0TH SHARE$
2
1996
$
21
FED SHARE$
17
GA. SHARE$
2
0TH SHARE$
2
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 24
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R---------E-S-T-S--
NEWTON I-20 AT GA. RR, ALCOVY RD, ALCOVY RVR & .OVERFLOW
PE 1994
UNDERWAY
210640 BRIDGES/ RECST. OR REHAB.
CONG DIST. 10
ROW NONE
$
0
PROJECT MILEAGE : .00
CONST 1996
$ 2812
MANAGER: G. ROSS
FUND SOURCE: I-STATE MAINT.
FED SHARE $ 2531
STATUS: REQ COVINGTON DO UTIL 10-5-93; NEWTON
UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
281
0TH SHARE $
NEWTON 222040
STATUS:
NEWTON 241980
STATUS:
SR 12 @ SR 142 (TURN lliJ:iJi:f & UPGRADE TRAFFIC
INTERSECTION IMPROVEMENT(/\. SAFETY
. ,,,,,,,/cii:C:i//i
PROJECT MILEAGE :. 30 - EX:[ST. LANES: 2 /PROP0!?1';P{~ES: 3
MANAGER: D. GRIFFITH
COVINGTON SGN 9-16-91 FOR
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
231290 IS AN ASSOCIATED PROJECT.
PE 1993 . UNDERWAY_
ROW 1995
$
so
. CONST 1996
$ 1054
FED SHARE $ 949
GA. SHARE $
105
0TH SHARE $
CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW LOCL
CONST 1995
$
517
FED.SHARE$
465
GA. SHARE$
52
0TH SHARE$
NEWTON 242100.
STATUS:
NEWTON 271010
STATUS:
CR 263/CONLEY DITCH ROAD@ LAKE JACKSON 10 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED PROJECT MILEAGE : .21 MANAGER: D. GRIFFITH (M) SEND LGPA 10/94
DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
\/{:t:::-
:t
)coNG Drsll tio
PE.1993 UNDERWAY
ROW LOCL
CONST 1995
$
327
FED SHARE $
294 .
GA. SHARE $
33
0TH SHARE $
PE 1995
$
ROW LOCL
CONST.1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
11
400 320
80'
-==
== =
~
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 25
FISCAL YEAR
COST ESTS
OCONEE 22256X
STATUS:
SR 24/US 441 FM MADISON BYP JUST N OF UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER:
RIV/ MORGAN
PE 1995
CONG DIST. 10
ROW
GRIP PROJECT
CONST
FUND SOURCE: GOVERNOR'S RD IMP PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
$
0
AFTER 97
AFTER 97
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
OGLETHOR SR 77 EAST OF LEXINGTON@ BIG INDIAN 222050 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE: .30 MANAGER: D. GRIFFITH STATUS: OGLETHORPE COUNTY SGN
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 222052 IS AN ASSOCIATED PROJECT.
OGLETHOR SR 77EAST OF LEXINGTON@ 222052 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .55 MANAGER: D. GRIFFITH STATUS: OGLETHORPE COUNTY SGN
CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 222050 IS AN ASSOCIATED PROJECT.
OGLETHOR SR 10 FM 10.2-2.2; 222460 ADDITION OF A PASSING
PROJECT.MILEAGE : 9.23 MANAGER: D. GRIFFITH (M) STATUS: SEND LGPA WHEN PROJECT IS
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 26
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1995
$
1
CONST 1996
$
387
FED SHARE $
310
GA. SHARE $
77
0TH SHARE $
PE 1993
UNDERWAY
ROW 1995
$
500
CONST 1996
$
410
FED SHARE $
328
GA. SHARE $
82
0TH SHARE $
PE ROW CONST
$
149
AFTER 97
AFTER 97
OGLETHOR CULVERT EXT@ VAR LOC ON STATE 27087X BRIDGES/ MAINTENANCE
PROJECT MILEAGE : .00 MANAGER: L. SEABROOK STATUS:
OGLETHOR WATSON MILL COVERED BRIDGE/CR 271020 BRIDGES/ ENHANCEMENT
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS: DOT WILL PROVIDE THE 20% MATCH
OGLETHOR BIG CLOUDS CREEK COVERED BRIDGE OVER BIG CLOUDS CREEK 271025 BRIDGES/ ENHANCEMENT
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS: DOT WILL PROVIDE THE 20% MATCH
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
0
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $
FEDERAL HIGHWAY ADMIN FUNDS
i2dOe:10<:ts AN ASSOCIATED PROJECT.
::;::::::.:::::=::-:-
GA. SHARE $ 0TH SHARE $
)\~::G Did:j i[o ...... =. ..... ,,.. F~;~~wl: TRAN~. ENH~ti: FEDE.tUill :HIGHWAY AbMIN 'FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
122
FED SHARE $
98
GA. SHARE $
24
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
1995
$
77
FED SHARE $
62
GA. SHARE $
15
0TH SHARE $
..
= =
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
PUTNAM 222020
STATUS:
SR 16@ LITTLE RIVER W/EATONTON REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH REQ PUTNAM COUNTY DO UTILITIES
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PUTNAM 222450
STATUS:
SR 24 AT WASHINGTON AVENUE SIGNALS/ SAFETY PROJECT MILEAGE : .12 MANAGER: BURT RIDDLE CONTACT TRAFFIC
CONG DIST. 11
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PUTNAM 2Bll64
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
PUTNAM 2Bll65
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH
DIST. 11
SOURCE: RURAL TRANSIT TRANSIT ADMIN FUNDS
PUTNAM 2C2165
STATUS:
ONE STANDARD VAN AND ONE MOBILE RADIO, TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH LGPA NOT APPLICABLE
22-Feb-1994 Page 27
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST.1995 $ 1200
FED SHARE$
960
GA. SHARE$ . 240
0TH SHARE$
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1995
$
198
FED SHARE $ 198
GA. SHARE $
0TH SHARE $
OPERATING 1995 $
67
FED SHARE $
39
GA. SHARE $
0TH SHARE $
28
OPERATING 1996 $
70
FED SHARE $
41
GA. SHARE $
0TH SHARE $
29
1996
$
21
FED SHARE$
17
GA. SHARE$
2
0TH SHARE$
2
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
RICHMOND I-20@ SAVANNAH RIVER 210327 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: D. CHURCH STATUS: LGPA NOT APPLICABLE
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
AUGUSTA TIP i GR 011
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 210570 IS AN ASSOCIATED PROJECT.
smi&thiit:~~RK s:t:!\,To RICHMOND I-520 FM I-20 TO SR 56SP INCL
FM
56SP
AUGUSTA TIP i RC-520
210360 STATUS:
RIDING SURFACE REHABILITATION.,:(ij'tJajfACE, GRIND, SE,$}:, STRIPE ETC.CONG DIST. 10 & 11
1J8IBI > ...... PROJECT MILEAGE : 3. 60 - EXISTU!tfil.i'ES: 4 /PROPOSED ~ES: 4
~!G:~; ~!~i~~~:TTHIS
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
210430 IS AN ASSOCIATED PROJECT.
WRIGHTSBOR;:;ffilF~:o """ , FJIIt ): RICHMOND I-520 FM
21Y430
210430 RECONSTRUCTION & WIDENI?'IG 'FROM 4 LANES TO 6 LANEiW
AUGUSTA TIP i RC-520
CONG DIST. 10
PROJECT MILEAGE': 1.37
MANAGER: K FULBRIGHT
FUND SOURCE: NAT'L HIGHWAY
STATUS: REQ RICHMOND COUNTYDO
FEDERAL HIGHWAY ADMIN FUNDS
210360 IS AN ASSOCIATED PROJECT.
RICHMOND I-520 FM WHEELER RD TO WRIGHTSBORO RD; 210440 RECONSTRUCTION & WIDENING FROM 4 LANES
PROJECT MILEAGE : 1.32 MANAGER: K FULBRIGHT STATUS: RICHMOND COUNTY SIGNED FOR UTILITIES
RICHMOND I-520 FM WHEELER RD NORTH TO I-20 210450 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : .76 MANAGER: K FULBRIGHT STATUS: SEND.LGPA IN 1996
RICHMOND I-20@ WHEELER RD/ALSO COLUMBIA CO 210490 INTERCHANGE/ NEW CONSTRUCTION
PROJECT MILEAGE: .27 - EXIST. LANES: 4 /PROPOSED LANES: 6 MANAGER: NEIL DAVIS STATUS: RICHMOND & COLUMBIA SGN UTIL 12-91; CITY SGN PUB UTIL 2-92
RICHMOND I-520 FM WRIGHTSBORO RD TO GORDON HWY- FOR IM; SEE 210430 21Y430 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STATUS:
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
cii:U'.16 Is .illi ASSOCIATED PROJECT:
~;;S~tJ\.: Rc-520 --:::>=, ~:~~!i!~!~w!~TJM~~r:~~~\
Rti2i~~ ~:::
FUND SOURci:t~~;;~ HIGHWAY.
FEDERAL -HIGli#AY ADMIN 250430fs:ANASSOCIATED
'Ji'(
CONG DIS;":\,,O _& 0
FUND SOURCE: FEDERAL HIGHWAY
22-Feb-1994 Page 28
FISCAL YEAR
COST ESTS
PE ROW NONE CONST
$
50
$
0
AFTER 97
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1995
$ 5546
FED SHARE $ 4991
GA. SHARE $
555
0TH SHARE $
PE 1994
UNDERWAY
ROW 1996
$
574
CONST 1997
$ 2053
FED SHARE $ 1642
GA. SHARE $
411
0TH SHARE $
PE 1994
UNDERWAY
ROW 1996
$ 2500
CONST 1997
$ 2042
FED SHARE $ 1634
GA. SHARE $
408
0TH SHARE $
PE 1994 ROW 1996 CONST
UNDERWAY $ 1000 AFTER 97
PE .1992
UNDERWAY
ROW 1993 UNDERWAY
1995
$ 8730
FED SHARE $ 6984
GA. SHARE $ 1746
0TH SHARE $
PE NONE
$
0
ROW NONE
$. .
0
CONST 1997
$ 1061
FED SHARE $
955
GA. SHARE $
106
0TH SHARE $
"""""""' .,,..,.,,,,,,
i,Y,._..,.,~hOtl
: .,.
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
RICHMOND I-520 FM WHEELER RO TO WRIGHTSBORO RD- E;OR IM; SEE 210440
~~~~ 21Y440
,I~~~wr: 00 - EXIST. LANES: 0 /ftOPOSEO LANES: 0
MANAGER:
STATUS:
CONG DIST, 0 & 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 210440 IS AN ASSOCIATED PROJECT.
RICHMOND BOBBY JONES EXPRESSWAY BRIDGE 220107 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : ,00 MANAGER: UNKNOWN STATUS: NOT APPLICABLE
TO SC
CONG DIST, 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 29
FISCAL YEAR
COST ESTS
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0 0 3086 2777 309
PE 1995 ROW NONE CONST
$
150
$
0
AFTER 97
RICHMOND SR 4/15TH ST/AUGUSTA tA:iit~EOGEVILLE RO TO
ST
220680 RECONSTRUCTION & WIDENING/FROM 2 LANES TO 4
ooif:E PROJECT MILEAGE : .87
MANAGER: BILL MOSKAL
=t!It==
STATUS: CO SGN 12-6-88 & CITY SGN ~{1ii"cB8.YTIL.
tti:jl::-::
,Wff Roii-t,
AUGUSTA TIP# RC-038 CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
PE 1992
UNDERWAY
ROW 1995
$
735
CONST 1997
$ 1912
FED SHARE $ 1530
GA. SHARE $
382
0TH SHARE $
RICHMOND sR 56 FM sR 23 To sR 56 sP;NEw Loc To sR s6;To BENNot'iilf.HtiF 221180 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES,..///'"
PROJECT MILEAGE: 6.20 MANAGER: RAY METTS STATUS: SIGNED.BURKE 6/86 ANO RICHMOND
J :+AuGusTA TIP t Rc-030
i{:{}(f:oNG DIST. 10
.. FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS d2:fias>!s AN ASSOCIATED PROJECT.
PE 1992
UNDERWAY
ROW 1992
UNDERWAY
CONST 1997
$ 6487
FED SHARE $ 5190
GA. SHARE $ 1297
0TH SHARE $
RICHMOND SR 56@ MCBEAN CREEK/ALSO BURKE CO
221185 REHAB. OF THE EXISTING BRIOGE(S). FROM 2 LANES TO 4
PROJECT MILEAGE : 00
_J
MANAGER: RAY METTS
STATUS: UNDER 221180 - REQ RICHMOND 00 UTILITIES 4-19-88
RICHMOND SR 56 SP/NEW SAVANNAH RO FM I-520 N TO US 78/GOROON HWY 221470 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE: 3.12 MANAGER: D. CHURCH STATUS: RICHMOND COUNTY SIGNED 11/22/88 FOR ROW ANO UTILITIES
: CQijG OI9#:t io
PE 1993 ROW NONE
UNDERWAY
$
0
kbldf': F~;g
BRIDGE PROG~ }
CONST 1997
$ 1400
FED SHARE $ 1120
~~~fffli~r:wf!s~~l;itP~g~JEcT ./
GA. SHARE $ ,OTH SHARE $
280
f5~~~J: ..;.i::~g!is~~s~:P 1 ! :
PE 1992 .UNDERWAY
ROW LOCL
tONST 1995
$
FUND SOURCE: ~iT L HIGHWAY :
FED SHARE$
FEDERAL ..iifokwAY AOMIN FUNDS /
GA. SHARE$
25034#~)\:N ASSOCIATED PROJECT'.
0TH SHARE$
4200 3360
840
RICHMOND SR 10/GOROON HWY FM SR 223 TOW/FORT GORDON GATE #1/&CLVT 221532 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.50 MANAGER: BILL MOSKAL (C) STATUS: RICHMOND SIGNED FOR UTILITIES 4-7-92.
AUGUSTA ftp# GH 025 CONG DIST .10 FUND SOURCE: SURFAciiii~SPORT.
FEDERAL HIGHWAY }J:>t-lIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
346
CONST 1996 $ 4700
FED SHARE $ 3760
GA. SHARE $
940
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEP_ARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
RICHMOND SR 4/DEANS BR RD FM S FT GORDON 221550 TURN LANES/ RECST. OR REHAB.
PROJECT.MILEAGE : 6.29 - EXIST. MANAGER: D. GRIFFITH STATUS: REQ RICHMOND COUNTY DO UTILITIES
LANES: 4
AUGUSTA TIP i RC-043
CONG DIST. 11 & 10
GRIP PROJECT
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
RICHMOND SR 415@ UTILITY; ROCKY; 221580 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .00 MANAGER: D. SMITH STATUS: RICHMOND COUNTY SIGNED
UTILITIES.
AUGUSTA TIP t RC-117
CONG DIST. 11
FUND SOURCE: NAT'L -HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 221588 IS AN ASSOCIATED PROJECT.
RICHMOND SR 415 FM NEW :SAVAJNN,!Ui-'ccl<U 221588 CONSTRUCTION OF
PROJECT MILEAGE : 5.15 MANAGER: D. SMITH STATUS: COUNTY SIGNED 8/8/89 FOR
AUGUSTA TIP t RC-117
CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 221580 IS AN ASSOCIATED PROJECT.
RICHMOND SR 28/FURYS FERRY RD FM RIVERWATCH PK TO CR 98/SEE -~~:~~~D~~ 22186X RECONSTRUCTION & WIDENING. NO LANE ADDITION
PROJECT MILEAGE : :. 00 MANAGER: D. CHURCH -
STATUS:
TIP# RC-CC-048 DIST. 10
SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
}if860i:i:; AN ASSOCIATED PROJECT.
k., RICHMOND I-520/SR 415@ SR 56 ADD WB LOOP
d :JV 222350
RAMP/ NEW CONSTRUCTION PROJECT MILEAGE : .00 -
EXIST.
LANES:
0
/PROPOSED
LANEsi
... -- AUGUSTA :~ RC-520
)<:;<:>.P..G DI~:t; Jo & 11.
MANAGER: D. CHURCH . (M)
F~6:1BW~i: I-STATE MAfi;lf(:
STATUS: RICHMOND COUNTY SIGNED FOR UTILITIES 12-15-92
tEotru :HIGHWAY Ab~rn ttmos
22-Feb-1994 Page 30
FISCAL YEAR
COST ESTS
PE 1994
UNDERWAY
ROW 1995
$
45
CONST 1996
$ 1150
FED SHARE $
920
GA. SHARE $
230
OTH-SHARE $
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1996
$ 6849
FED SHARE $ 5479
GA. SHARE $ 1370
0TH SHARE $
PE 1991
UNDERWAY
ROW NONE
$
0
CONST 199.6
$ 7600
FED SHARE $ 6080
GA .. SHARE $ 1520
0TH SHARE $
PE 1992 UNDERWAY
ROW 1996
$
0
CONST 1997
$
0
FED SHARE $'
GA. SHARE $
0TH SHARE $
PE 1993
ROW 1996 CONST
UNDERWAY $. 1000 AFTER 97
RICHMOND SR 4/US 1@ TOBACCO RD IN AUGUSTA
222370 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: D. CHURCH (M)
STATUS: SEND LGPA IN 1996.
:1 k&~~:TA TIP ,
ONG DIST. 10
G~;P PROJEQ't\ _
FUND SOURCE:}-NAT' L HIGHWAY FEDE:.R:::. AL.H.I.G..H...W.. AY ADMIN
RICHMOND GREENE STREET FM 12TH STREET TO 4TH STREET IN AUGUSTA 222430 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : 1.36 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. GRIFFITH STATUS:. CONTACT TRAFFIC OPERATIONS
AUGUSTA iP t RC-048
CONG DIST.\11
_.//?(::CC{/
FUND SOURCE: HWY._., ,-.:SJ'U' ;1 FEDERAL HIGHWAY
PE 1994 ROW 1996
UNDERWAY
$
25
AFTER 97
PE 1994
UNDERWAY
ROW 1995' $
1,0
CONST 1997
$
578
FED SHARE $
520
GA. SHARE $
58
0TH SHARE $
.......,.,,.
' ; .. ' :..~,-
COUNTY P.-I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
RICHMOND SR 88 FM W/CR 65/HEPHZIBAH E TO SR 231000 RECONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE : 2.30 MANAGER: D. GRIFFITH STATUS: RICHMOND SGN 8-8-89 & HEPSIBAH
CONG DIS_T. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 31
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1992
UNDERWAY
CONST 1995
$ 2007
FED SHARE $ 1606
GA. SHARE $
401
0TH SHARE $
RICHMOND CSX RAILROAD AT OLIVE RD 240809 BRIDGES/ SAFETY
PROJECT MILEAGE : .00
MANAGER: D. CHURCH STATUS: CITY SGN 5/91 ROW/UTIL
AUGUSTA TIP i RC-9104 CONG DIST. 11 & 10
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 24Y809 IS AN ASSOCIATED PROJECT.
PE 1991 UNDERWAY
ROW LOCL
CONST 1996
$ 3219
FED SHARE $ 2575
GA. SHARE $
644
0TH SHARE $
RICHMOND CSX RR AT OLIVE RD 24Y809 UNKNOWN/ SAFETY
PROJECT MILEAGE : .00 MANAGER: D. CHURCH STATUS: LGPA NOT APPLICABLE
AUGUSTA TIP i RC-9104 CQNG DIST. 11 & 10
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 240809 IS AN ASSOCIATED PROJECT.
PE 1991
UNDERWAY
ROW LOCL
CONST 1996
$ 2306
FED SHARE $ 2191
GA. SHARE $
115
0TH SHARE $
RICHMOND BELAIR RD EXT FM FT GORDON GATE 1 TO BELAIR
\AUGUSTA TIP II RC-CC-207
PE 1992
UNDERWAY
250320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4
(\:;QNG DIST. 10
ROW 1993
UNDERWAY
PROJECT MILEAGE : 3.28
CONST 1995
$ 19963
~t:~1 STATUS:
~GNc:~:iHUTIL;RICHMOND SGN 10/90''g;q,t{~:;/:6:R $600K
FUND SOURCE: NAT'L HIGHWAY fJ;:l)ERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 15970 GA. SHARE $ 3993
0TH SHARE $
RICHMOND SR 56 SPUR/NEW SAVANNAH RD@ ROCKY CREEK 250340 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4
.~,i: 'WM,i~~f Rc-207
PE 1986 ROW 1987
UNDERWAY UNDERWAY
PROJECT MILEAGE : .30 MANAGER: D. CHURCH
FUND sd&td:E = BRIDGE PROGRAM:> =
CONST 1995
$
594
FED SHARE $
475
STATUS: LGPA SIGNED BY CO 8-20-85 FOR UTILITIES
FEDERii:i:}:liIGHWAY ADMIN FUNDS
: :'\
GA. SHARE $
119
22i-4_10==Is AN AssocAirib PROJECT./
0TH SHARE $
RICHMOND WINDSOR SPRINGS RD FM TOBACCO RD TO MEADOWBROOK DR 250374 RECONSTRUCTION & WIDENING FROM.2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.82 MANAGER: D. SMITH STATUS: SIGNED 1-5-88 FOR ROW & UTILITIES. SEE MR-7007(2)
RICHMOND CR 65/WINDSOR SPRINGS RD@ BUTLER CREEK 250375 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .00 MANAGER: D. SMITH STATUS: RICHMOND COUNTY SIGNED 1-5-88 FOR ROW AND UTILITIES
PE 1992
UNDERWAY
ROW LOCL
........,,.,,.::coNST 1995 $
FCJND SOURcit'ii;;~ACE TRANSPokfk t
FED SHARE $
~~~j~Jj~~W!!s~~i~E~u:~;;k2ffi(
~*H :::~ ~
4607 3455 1152
~~~~s~1s!~l1~ :c;:6007}! : }
FUND souRcE = BRrnrik VitoGRAM FEDERAL HIGHWAY AbMIN FUNDS 250374 IS AN ASSOCj:11,~ED PROJECT.
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$
556
FED SHARE$
445
GA. SHARE$
111
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 32
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST.
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
R-I-C-H-M-O-N-D--W--H-E-EL-E-R--R-D-/-C-R--6-0-1--F-M--I---2-0--T-O--M-E-D--IC-A-L--C-E-N-T-E-R--D-R-IV-E------------------A-U-G-U-S-T-A--T-IP---ff--R-C---C-C---7-0-11----------------P-E--1-9-9-2------U-N-D-ER-W--AY
250430 RECONSTRUCTION & WIDENING FROM 2 LANES T6:.4 LANES.
CONG DIST. 10
ROW LOCL
PROJECT MILEAGE : .91
CONST 1995
$ 2066
~~~:~ STATUS:
~~ii~T~A~i~NED/ROW AND UTILITIEi{ i:if!V,!!9.
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $ 1653
GA. SHARE $
413
210490 IS AN ASSOCIATED PROJECT.
0TH SHARE $
RICHMOND 250490
STATUS:
AUGUSTA TIP ff RC-7000 CONG.DIST. 11 & 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
$
39
ROW LOCL
CONST 1997
$
772
FED SHARE $
618
GA. SHARE $ 154
0TH SHARE $
RICHMOND WALTON WAY INTERSECT:ccil!~!;!:VEMENTs. WITH 13TH s~1tii~~~A
250550 INTERSECTION IMPROVEMENT/}\.SAFETY
.,.,,,,.,., .. ,.,:,:c,,=
=~;~:: ~:::~~;8Jf. PROJECT MILEAGE : . 56 - EX{ST. LANES: 6 /PROPOSl!:)t~ES: 7
STATUS,:
S~G~~Ii~~i!-92 FOR llQW/PJILITI~
AUGUSTA TIP ff RC-7027 CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1995
$
198
FED SHARE $
178
GA. SHARE $.
20
OTHSHARE $
RICHMOND PLEASANT HOME RD NORTH LEG OVER CSX RAILROAD
250570 BRIDGES/ RECST. OR REHAB.
DIST. 10
PROJECT MILEAGE : .00
MANAGER: D. CHURCH (M)
FUND SOURCE: SURFACE TRANSPORT.
STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP
f~p~RAJ.HIGHWAY ADMIN FUNDS
250560,:,::ts AN ASSOCIATED PROJECT.
r~~~~s ~;i,~ mtT~~!fc~ ~i RICHMOND
270880
1
~TO~:::::SED LANEsdf!I~*:.,;;;.~1 RC-ODOE
MANAGER: NEAL WILKES STATUS: TO BE DONE BY CONTRACT
F~6'.::~,~8t{ TRAN~, .EN~!:]) FEOERALiHIGHWAY AbMINtUNDS
PE ROW LOCL CONST
$
15
AFTER 97
PE 1995 $
20
ROW LOCL
CONST 1995
$
305
FED SHARE $ 244
GA. SHARE $
4
0TH SHARE $
65
RICHMOND COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1169 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH STATUS:
;JN~ souRci~!Ik&fu TRANSIT
~ 9
PPERATIN~E~ !~ARE
68 39
FEiiERAL.,Tfuili'tfT ADMIN FUNDS.,}:,:;:,, :
GA. SHARE $
0TH SHARE$
29
.RICHMOND COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll70 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH STATUS:
.OPERATING 1996 $
71
FUND SOURCE: RURAtfilili;IT
FEDERAL TRANSIT .fillMlN FUNDS
FED SHARE.$
40
GA. SHARE $
0TH SHARE$
30
( ..
...........
=
a:~-....c.w
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
RICHMOND ONE CONVERSION VAN WITH LIFT 2C2169 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 10 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 33
FISCAL YEAR
COST ESTS
CAPITAL 1995
$
33
FED SHARE$
26
GA. SHARE$
4
0TH SHARE$
3
RICHMOND ONE CONVERSION VAN WITH LIFT 2C2170 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
CONG DIST. 10 & 11
CAPITAL 1996
$
33
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
3
RICHMOND PURCHASE 5 TRANSIT 2D2011 TRANSIT PROJECTS/
FUNDS RECIPIENT: AUGUSTA MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
CONG DIST. 10 & 11
CAPITAL 1995
$
950
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
760
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
95
0TH SHARE$
95
RICHMOND PURCHASE 3 TRANSIT VEHICLES AND 2D2012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
DIST. 10 & 11
SOURCE: URBAN TRANSIT TRANSIT ADMIN FUNDS
CAPITAL 1996
$
822
FED SHARE$
658
GA. SHARE $
82
0TH SHARE$
82
RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND 2D2014 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT-SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
1852 778
6
1068
RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND RICHMOND COUNTY 2D2015 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
RICHMOND ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 2V1020 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA MPO AREA MANAGER: STEVE KISH STATUS: NOT APPLICABLE
DIST. 19(f! SOURcti&l:M~
FED~_RAI, i~iT
CONG,~;!(0 &
FUND SOURCE: FEDERAL TRANSIT
1996 $ FED SHARE$ GA. SHARE$
0TH SHARE$
1963 785
2
1180
CAPITAL 1995
$
50
FUND FED SHARE$
40
GA. SHARE$
5
0TH SHARE$
5
COONTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 34
FISCAL YEAR
COST ESTS
RICHMOND ELDERLY AND DISABLED VEHICLES AND 2V1021 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA MANAGER: STEVE KISH
STATUS: NOT APPLICABLE
CONG DIST. 10 &_ 11
CAPITAL 1996
$
52
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
42
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
5
0TH SHARE$
5
,,
,,
"
= = =
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
SCREVEN 231100
STATUS:
SR 17@ JACKSON BRANCH REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .33 MANAGER: D. GRIFFITH
SCREVEN COUNTY SIGNED 6/29/90 FOR
CONG DIST. 11
FUND SOURCE: BRIDGE-PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
~
- I
,,
22-Feb-1994 Page 35
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995
$
339
FED SHARE $
271
GA. SHARE $
68
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TALIAFER CR 80 OVER HARDEN CREEK NORTH OF 270800. REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH STATUS: TALIAFERRO SGN 4-3-92 FOR ROW,
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 36
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995
$
293
FED SHARE $ 234
GA. SHARE $
59
0TH SHARE $
TALIAFER CULVERT EXT@ VAR LOC 27087Z BRIDGES/ MAINTENANCE
PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
STATUS:
PE NONE
$
0
CONG DIST. 2
ROW NONE
$
0
CONST 1995
$
0
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
270870 IS AN ASSOCIATED PROJECT.
0TH SHARE $
TALIAFER COUNTY OPERATED 2Bll79 TRANSIT FACILITIES
FUNDS RECIPIENT: MANAGER: STEVE KISH STATUS:
CONG DIST. 11
OPERATING 1995
$
39
FUND SOURCE: RURAL TRANSIT
FED SHARE $
21
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
18
TALIAFER COUNTY OPERATED PUBLIC TRANSIT SERVICE .2B1180 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH STATUS:
DIST. 11
OPERATING 1996
$
41
SOURCE: RURAL TRANSIT
FED SHARE $
23
TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
19
TALIAFER ONE STANDARD VAN 2C2179 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
1995
$
20
FED SHARE$
16
GA. SHARE$
2
0TH SHARE$
2
,.
~
~ """""""'
=
~-;...0M.1::l:
~ ,--:
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TREUTLEN I-16 AT OVERPASS FOR GEORGIA 210610 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE: .00 MANAGER: GENE POWELL (M) STATUS: TREUTLEN COUNTY SIGNED 12-7-93
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 37
FISCAL .YEAR
COST ESTS
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1996 "$
578
FED SHARE $
520
GA. SHARE $
58
0TH SHARE $
TREUTLEN REPLACE BRIDGE CARRYING 222200 REHABILITATION OF THE
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH STATUS: TREUTLEN COUNTY SIGNED
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1994
$
5
CONST 1996
$ 1537
FED SHARE $ 1230
GA. SHARE $
307
0TH SHARE $
TREUTLEN SR 29@ RED BLUFF 222205 REHABILITATION OF
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH STATUS: TREUTLEN COUNTY SIGNED
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW NONE
UNDERWAY
$
0
I
CONST 1996
$
319
FED SHARE $
255
GA. SHARE $
64
0TH SHARE $
TREUTLEN COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1184 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: TREUTLEN MANAGER: STEVE KISH STATUS:
DIST. 8
OPERATING 1995 $
30
SOURCE: RURAL TRANSIT
FED SHARE$
18
TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
12
TREUTLEN COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1185 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: TREUTLEN MANAGER: STEVE KISH -STATUS:
$
32
SHARE$
19
GA. SHARE$
0TH SHARE$
13
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT. LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TWIGGS 22207X
STATUS:
SR 87 FM SR 112 TO SR 96 . SEE RECONSTRUCTION & _WIDENING. NO LANE PROJECT MILEAGE : 8.00 MANAGER: UNKNOWN
PROPOSED.
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 222070 IS AN ASSOCIATED PROJECT .
22-Feb-1994 Page 38
FISCAL YEAR
COST ESTS
PE 1992 ROW 1996 CONST
UNDERWAY
$
0
AFTER 97
..
"""""""'
~ ==
=
G~,~...-.t:.h..'.J
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WARREN 22157X
STATUS:
SR 17 FM CR 47/JEFFERSON TO MP UNKNOWN/ UNKNOWN PROJECT MILEAGE : MANAGER: UNKNOWN
CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 221575 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 39
FISCAL YEAR
COST ESTS
PE ROW CONST
$
0
AFTER 97
AFTER 97
WARREN 222390
STATUS:
SR 16 OVER GOLDEN CREEK IN REPLACEMENT OF THE EXISTING PROJECT MILEAGE.: .00 MANAGER: D. GRIFFITH (M) SEND LGPA IN 1995
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1996
$
1
CONST 1997
$
738
FED SHARE $
590
GA. SHARE $
148
0TH SHARE $
WARREN 2B1189
STATUS:
COUNTY OPERATED TRANSIT FACILITIES FUNDS RECIPIENT: WARREN MANAGER: STEVE KISH
CONG DIST. 11
OPERATING 1995 $
41
FUND SOURCE: RURAL TRANSIT
FED SHARE$
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
17
WARREN 2B1190
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WARREN
MANAGER: STEVE KISH
DIST. 11
OPERATING 1996 $
43
SOURCE: RURAL TRANSIT
FED SHARE$
25
f.EP~R/\~. TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE$
18
WARREN 2C2189
STATUS:
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WARREN MANAGER: STEVE KISH LGPA NOT APPLICABLE
1995
$
32
FED SHARE$
26
GA. SHARE$
3
0TH SHARE$
3
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WASHINGT SR 15: NB MP 28.1-29.6/WASHINGTON//SB 222300 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 3.00 MANAGER: D. GRIFFITH (M) STATUS: REQ WASHINGTON DO UTILITIES 4/92;
1.0-2.5/HANCOCK
CONG DIST; 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 40
FISCAL YEAR
.COST ESTS
PE 1995 ROW CONST
$
45
AFTER 97
AFTER 97
WASHINGT SR 24 BET SANDERS'LE & 231240 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 2.60 MANAGER: D. GRIFFITH (M) STATUS: SEND LGPA WHEN PROJECT
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE ROW CONST
$
45
AFTER 97
AFTER 97
WASHINGT CR 357 AT STEEL 242150 REPLACEMENT OF THE
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH (M) STATUS: REQ CO DO PUB UTILITIES
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
6
AFTER 97
WASHINGT COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1504 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH.
STATUS:
WASHINGT COUNTY OPERATED PUBLIC TRANSIT SERVICE
2B1505 TRANSIT FACILITIES/ OPERATIONS
'
FUNDS RECIPIENT: WASHINGTON
MANAGER: STEVE KISH
STATUS:
WASHINGT ONE STANDARD VAN AND ONE MOBILE RADIO 2C2504 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
WASHINGT ONE STANDARD VAN AND ONE MOBILE RADIO 2C2505 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
DIST. 11
OPERATING"l995 $
40
FUND SOURCE: RURAL TRANSIT
FED SHARE$
23
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
17
\\ .
Ois2: 41 ..C.O...N..G
/ .::: ..
. .. :.;:.:.;..
i&Jid'lL F~;
.OPERATING 1996 $
RURAL TRANS!' ()
FED SHARE$
47 27
. FEDERAL 'TRANSIT ADMIN FUNl:>S
GA. SHARE$
,:::'
0TH SHARE$
20
;-::-:-::
.. ~
idt6 SOURciffilt/fuu. TRANSIT
FEI>ERAL.,-TR:ANSIT ADMIN
1995
$
21
FED SHARE$
17
-GA. SHARE $
2
0TH SHARE$
2
CONG DIST.
FUND SOURCE: FEDERAL TRANSIT
CAPITAL 1996
$
21
FED SHARE $
17
GA. SHARE $
2
0TH SHARE $
2
l
., "
a:m=
I!!!!!!'.!!!!!'
t!'--
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WILKES 270960
STATUS:.
REVITALIZATION/LANDSCAPE HISTORIC DIST LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. MANAGER: C. HAMILTON LGPA TO BE DONE BY CONTRACT
CONG DIST. 11 & 10 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
WILKES 2Bll94
STATUS:
COUNTY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: WILKES MANAGER: STEVE KISH
CONG DIST. 10 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
WILKES 2B1195
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: WILKES MANAGER: STEVE KISH
CONG DIST. 10 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
WILKES 2C2194
STATUS:
ONE STANDARD.VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILKES MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 10 & 11
SOURCE: RURAL TRANSIT F.~1/~.~~. TRANSIT ADMIN FUNDS
WILKES 2C2195
STATUS:
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILKES MANAGER: STEVE KISH LGPA NOT APPLICABLE
22-Feb-1994 Page 41
FISCAL YEAR
COST ESTS
PE LOCL
ROW NONE $
0
CONST 1995 $ 500
FED SHARE $
400
GA. SHARE $
0TH SHARE $ 100
OPERATING 1995 $
53
FED SHARE$
31
GA. SHARE$
0TH SHARE$
22
OPERATING 1996 $
55
FED SHARE$
32
GA. SHARE$
0TH SHARE$
23
CAPITAL 1995
$
20
FED SHARE$
16
GA. SHARE$
2
0TH SHARE$
2
1996
$
32
FED SHARE$
26
GA. SHARE$
3
0TH SHARE$
3
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 42
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
---------------------------- ------------------------------------------------------------------------------------------------------
WILKINSO US 441@ SOUTHERN RR & COMMISSIONERS
PE 1992
UNDERWAY
221764 REHAB, OF THE EXISTING BRIDGE (S).
LANES.
CONG DIST. 11
ROW NONE
$
0
PROJECT MILEAGE : .00
GRIP PROJECT
CONST 1997
$
605
MANAGER: M. REYNOLDS
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
484
STATUS: REQ MCINTYRE DO UTIL 6-3-92;
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 121
221760 IS AN ASSOCIATED PROJECT,
0TH SHARE $
WILKINSO SR 29/US 441@ .BLACK CREEK
221935 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : ,00
MANAGER: M. REYNOLDS
STATUS:
WILKINSON REFUSED
CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221930 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1996
$
161
FED SHARE $ 129
GA. SHARE $
32
0TH SHARE $
WILKINSO COUNTY OPERATED 2B1199 TRANSIT FACILITIES
FUNDS RECIPIENT: MANAGER: STEVE KISH STATUS:
CONG DIST. 11
OPERATING 1995 $
32
FUND SOURCE: RURAL TRANSIT
FED SHARE$
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
WILKINSO COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1200 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WILKINSON MANAGER: STEVE KISH STATUS:
OPERATING 1996 $
33
SOURCE: RURAL TRANSIT
FED SHARE$
19
TRANSIT ADMIN FUNDS
GA, SHARE$
0TH SHARE$
14
WILKINSO ONE CONVERSION VAN WITH LIFT AND ONE MOBILE 2C2199 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WILKINSON MANAGER: STEVE KISH STATUS:. LGPA NOT APPLICABLE
1995
. $
33
FED SHARE$
26
GA. SHARE$
4
0TH SHARE$
3
l!!l!!!!:!m
~
~
~
~
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ALL 315095
STATUS:
LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY
~;g~c~I~~~E!G~~u~/-~!~;~~~~ES: 0 )#~QPOSED LANES: 0 MANAGER: L. SEABROOK LGPA NOT APPLICABLE
CONG DIST, 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ALL 315096
STATUS:.
< LUMP SUM MAINTENANCE ON PRINCIPAt{:ktH\@:iAL FOR FY =S. .. MPRINOOJERCWTIMDEINLEA&GREES: UR.F0 0 / _.MAEXINITSE.T_N'.'".!\N.: t,E]S}'./ 0 /PROPOSED L:A: NES: 0
MANAGER: L. SEABROOK LGPA NOT APPLICABLE
:>
ALL 315097
STATUS:
LUMP SUM MAINTENANCE 6&!fi~NCIPAL ARTERI.hl. FOR FY./ MINOR WIDEN & RESURF / MAINTENANCE PROJECT- MILEAGE : . 00 - EXIST. LANES: 0 /PROPO$iP.}tJJfas: 0 MANAGER: L. SEABROOK LGPA NOT APPLICABLE
CONG DIST. 99 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 99 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ALL 315L95
STATUS:
LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYS
~it; SIGNING/ SAFETY
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSEJ::>::
0
MANAGER:
LGPA NOT APPLICABLE
'dONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
tu;L
315L96
STATUS:
LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYSfi:M - 1996
SIGNING/ SAFETY
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANESf cf\//
MANAGER: LGPA NOT APPLICABLE
,))~QijG Disi#:fo9
"::;.;.:.
.
FUND)ifoilii2t: NAT'L. HIGHWA'.\
FEotffl itiGHwAY .AbH:rn)ii:rnbs
ALL 315L97
STATUS:
LUMP SUM LOGO SIGNS ON NHS FOR FY 97
SIGNING/ SAFETY
.
PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
LGPA NOT APPLICABLE
\': :QNG DIST.
itAfo souRc1n::w1;;-, L HIGHWAY
FEDE:~ ..fffoft#j(y ADMIN
ALL 315095
STATUS:
LUMP SUM.INTERCHANGE/ROADWAY LIGHTING FOR FY 1995
LIGHTING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN .
CONG DIST. '=':99 FUND souRcE = NAT'.tnH&iiwAY
FEDERAL HIGHWAY Jilit.fi:N FUNDS
22-Feb-1994 Page 1
FISCAL YEAR
COST ESTS
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 30000 24000 6000
PE NONE
$
ROW NONE
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 30000 24000 6000
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
'
0 0 30000 24000 6000
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
100
FED SHARE $
80
GA. SHARE $
20
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST 1996
$
100
FED SHARE $
80
GA. SHARE $
20
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
/CONST 1997
$
100
FED SHARE $
80
GA. SHARE $
20
0TH SHARE $
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 1000 800 200
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ALL 315096
STATUS:
LUMP SUM INTERCHANGE/ROADWAY LIGHTING
LIGHTING/ MAINTENANCE
.
PROJECT MILEAGE : .00 - EXIST. LANES:
MANAGER: UNKNOWN
CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 2
FISCAL YEAR
COST ESTS
PE NONE $ ROW NONE $ CONST 1996 $
FED' SHARE $ GA. SHARE $ 0TH SHARE $
0 0 1000
800 200
ALL 315097
STATUS:
LUMP SUM INTERCHANGE/ROADWAY LIGHTING/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:
CONG DIST. 99
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE $
CONST 1997 $
FED SHARE $'
GA. SHARE $
0TH SHARE $
0 0 1000 800
200
ALL 33A095
STATUS:
LUMP SUM SAFETY UNKNOWN/ SAFETY PROJECT MILEAGE : MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE' $ ROW NONE $
CONST 1995 $ FED SHARE $ GA. SHARE $ 0TH SHARE $.
0 0 1000 900 100
ALL 33A096
STATUS:
LUMP SUM SAFETY "OPTIONAL" FOR FY96 UNKNOWN/ SAFETY PROJECT MILEAGE: .00 - EXIST. LANES: MANAGER: LGPA NOT APPLICABLE
DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 1000 900 100
ALL 33A097
STATUS:
LUMP SUM SAFETY "OPTIONAL" FOR FY97
UNKNOWN:/ SAFETY
{=(CONG
ffi~~t': Ji:() PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES{(Q)\}'
MANAGER:
FUl-1;:::
HWY .J,~AFE'fg::
LGPA NOT APPLICABLE
FEDE~i::liIGHWAY Ab~:rn_}tO.NPS .
PE NONE $
ROW NONE $
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0
0 1500 1350
150
ALL ., LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F
33C095 MINOR WIDEN & RESURF / MAINTENANCE PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
STATUS: LGPA NOT APPLICABLE
PE NONE
$
0
i \ }ONG DIST. 9.9/'
ROW NONE
$
0
::::J~:~~~~i.w.,i!l~~;~NT~;~i,r:; 1 : :m:toNsi:~ 9i~::
2500 2000
500
0TH SHARE$
ALL
LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F
33C096 MINOR WIDEN & RESURF / MAINTENANCE
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
STATUS: LGPA NOT APPLICABLE.
CONG DIST.:::99 FUND SOURCE: SURFA8~~sPORT.
FEDERAL HIGHWAY J$M:f~ FUNDS
PE NONE
$
ROW NONE
$
CONST .1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 7500 6000 1500
~ !l'l!!!.!fflffl
&,=9
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ALL 33C097
STATUS:
LUMP SUM MAINTENANCE FOR AREAS POP> MINOR WIDEN & RESURF / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ALL 33CB95
STATUS:
LUMP SUM BRIDGE PAINTING BRIDGES/ MAINTENANCE PROJECT MILEAGE : ,00 MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ALL 33CB96
STATUS:
LUMP SUM BRIDGE BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ALL 33CB97
STATUS:
LUMP SUM BRIDGE PAINTING "33C" FOR FY BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
DIST. 99
SOURCE: SURFACE TRANSPORT. ADMIN FUNDS
ALL 33D095
STATUS:
LUMP SUM MAINTENANCE FOR "ANY AREA" FOR
!& MINOR WIDEN & RESURF / MAINTENANCE
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES.f
MANAGER:
.
LGPA NOT APPLICABLE
ALL 33D096
STATUS:
LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 96 MINOR WIDEN & RESURF / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LGPA NOT APPLICABLE
}CONG DIS'.1:'i/@9
sB6foie FUND
= suRFAcE T~11:8k4''?
FEDl!ifilili,Jh:GHWAY Ariij:i:N:\fij#ps
.,:::::::::::::::::::::::::,::
99)
:;t1
FUND souRcil AD
ALL 330097
STATUS:
LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 97 MINOR WIDEN & RESURF / MAINTENANCE PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LGPA NOT APPLICABLE
CONG DIS;'''.'\::99
ADMIN FUND souRcE: suRFKtt/4kANsPORT.
FEDERAL HIGHWAY
FUNDS
22-Feb-1994 Page 3
FISCAL YEAR
COST ESTS
PE NONE $
ROW NONE $
CONST 199=7
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 7500 6000 1500
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 4000
3200 800
PE NONE
$
ROW NONE
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 4000 3200 800
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 3750 3000 750
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 10000 8000 2000
PE NONE
$
ROW NONE
$
/CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 13400 10720 2680
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 13000 10400 2600
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 4
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------------------------------------------------- .---------------------------------------------------------------------
ALL
LUMP SUM BRIDGE PAINTING "33D" FOR
PE NONE
$
0
33DB95 BRIDGES/ MAINTENANCE
CONG DIST. 99
ROW NONE $
0
PROJECT MILEAGE : .. 00
CONST 1995 $ 3000
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 2400
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY. ADMIN FUNDS
GA. SHARE $
600
0TH SHARE $
ALL 33DB96
STATUS:
LUMP SUM BRIDGE PAINTING BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
s CONST 1996 $ FED SHARE
GA_. SHARE $
0TH SHARE $
o
0 5000 4000
1000
ALL 33DB97
STATUS:
LUMP SUM BRIDGE BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1997 $
FEDSHARE $
GA. SHARE $
0TH SHARE $
0 0 3500 2800 700
ALL 33DL95
STATUS:
LUMP SUM iNSTALLATION SIGNING/ SAFETY .
PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: LGPA NOT APPLICABLE
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
50
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $
40
FED~SAJ, HIGHWAY ADMIN FUNDS
GA .. SHARE $
10
0TH SHARE $
ALL . 33DL96
STATUS:
LUMP SUM INSTALLATION OF LOGO SIGNS "1996"
SIGNING/ SAFETY
PROJECT MILEAGE : .00 EXIST. LANES: 0 /PROPOSED LANESi/:0//:::e:
MANAGER: LGPA NOT APPLICABLE
f
:c:QNG Distrn:~9
16WdJ: SURFACE T~1ifoiT: .illi~rn::tilit6s
PE NONE $"
0
ROW NONE
$
0
CONST 1996 $
50
FED SHARE $
40
GA. SHARE $
10
0TH SHARE $
ALL
LUMP SUM LOGO SIGNS FOR 1997
0
33DL97 SIGNING/ SAFETY
0
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
50
MANAGER:
40
STATUS: LGPA NOT APPLICABLE
10
ALL 33MS95
STAT~S:
LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 95 RR XING / SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE : HWY jJ:li/,~f~ -
FEDERAL HIGHWAY ADMII't FUNDS :-:-;.:-.-:--.-;
PE NONE
$
ROW NONE
$
CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0
34.00 3060
340
l!!m!m ~ l!!!!!!\!fflJ
~
~
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ALL 33MS96
STATUS:
LUMP SUM RRX PROTECTION DEVICES "33M" RR XING / SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: W HESTER LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 5
FISCAL YEAR
COST ESTS
PE NONE $
ROW NONE
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 3026 2723 303
ALL 33MS97
STATUS:
LUMP SUM RRX PROTECTION RR XING / SAFETY PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
/PROPOSED
CONG DIST. 99
0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE $
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 3026 2723 303
ALL 33NS95
STATUS:
LUMP SUM RRX HAZARD RR XING / SAFETY PROJECT MILEAGE : .00 MANAGER: W HESTER LGPA NOT APPLICABLE
CONG DIST. 99
0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE $
0
CONST 1995
$
720
FED SHARE $
648
GA. SHARE $
72
0TH SHARE $
ALL 33NS96
STATUS:
LUMP SUM RRX HAZARD ELIMINATION "33N" RR XING / SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: W HESTER LGPA NOT APPLICABLE
DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
((f':
PE NONE
$
ROW NONE $
CONST 1996
$
FED SHARE $
GA. SHARE $
OTH.SHARE $
0 0 2488 2239 249
ALL 33NS97
STATUS:
LUMP SUM RRX HAZARD ELIMINATION "33N"
RR XING / SAFETY PROJECT MILEAGE :
. 00
-
EXIST.
LANES:
0
/PROPOSED LANESi, :&%\,:,,
MANAGER:
LGPA NOT .APPLICABLE
FUNo:::s-awci = HWY., sAFETt', '}" FEOJtffi,itfoHWAY ADMIN
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
,,:-;-:-:,:-:,;:-:::,:>::-:;:.:--
GA. SHARE $ 0TH SHARE $
0 0 3026 2723 303
ALL 3AA095
STATUS:
LUMP SUM MAINT. FOR AREA POP BT SK - 200K FOR FY 1995 MINOR WIDEN & RESURF / MAINTENANCE PROJECT MILEAGE: .00 - EXIST. LANES:, 0 /PROPOSED LANES: 0 MANAGER:
LGPA NOT APPLICABLE
\/86NG DIST. 9$1:,:)
idNo sou~gt}(}jtH~FACE TRANSPOR'r}
FEiiERALdtti3liWAY ADMIN
PE NONE
$
ROW NONE
$
ii,'CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 12500 10000 2500
ALL
LUMP SUM MAINT. FOR AREA POP BET 5,000-200,000 FOR FY 96
PE NONE
$
0
3AA096 MINOR WIDEN & RESURF / MAINTENANCE
CONG DIST. \99
ROW NONE $
0
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STATUS: LGPA NOT APPLICABLE
ADMIN FUND souRcE: sURFAti:filANsPoRT.
FEDERAL HIGHWAY
FUNDS
CONST 1996 $ 10000 FED SHARE $ 8000 GA. SHARE $ 2000
I
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 6
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------- ----- ~---------------------------------------------------------------------------------------------------------
ALL
LUMP SUM MAINT. FOR AREA POP BET 5,
FOR FY 97
PE NONE
$
0,
3AA097 MINOR WIDEN & RESURF / MAINTENANCE
CONG DIST. 99
ROW NONE
$
0
PROJECT MILEAGE : .00 - EXIST. LANES:: 0
CONST 1997
$ 10000
MANAGER:
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 8000
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 2000
0TH SHARE $
ALL 3AAB95
STATUS:
LUMP SUM BRIDGE PAINTING BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1995 $
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 3000 2400 600
ALL 3AAB96
STATUS:
LUMP SUM BRIDGE BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PENONE
$
ROW NONE
$
CONST 1996 $
FED SHARE$
GA. SHARE$
0TH SH,ARE $
0 0 2500 2000 500
ALL 3AAB97
STATUS:
LUMP SUM BRIDGE PAINTING "3AA" FOR FY BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
DIST. 99
SOURCE: SURFACE TRANSPORT. HIG~WAY ADMIN FUNDS-
PE NONE $
ROW NONE
$
CONST 1997 $
FED SHARE"$
GA. SHARE$
0TH SHARE$
0
0 3000 2400
600
~
~
COUNTY P .I.NO.
DESCRIPTION PRO.:,ECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BIBB 310980
STATUS:
I-16@ SR 540 INCL I-16 ML BR@ SAL INTERCHANGE/ RECST. OR _REHAB. PROJECT MILEAGE : .97 - EXIST. MANAGER: BEN BUCHAN LGPA SIGNED BY CO 4-16-85 FOR
& 1 RIVER
MACON TIP# llOC-MC CONG DIST. 8 GRIP PROJECT FUND _SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
BIBB 311460
STATUS:
I-75@ HARTLEY BRIDGE RD/CR INTERCHANGE/ RECST. OR PROJECT MILEAGE : .00 MANAGER: BEN BUCHAN (M)
COUNTY REFUSED 11-17-92 .c,\C?~Z:%cc
MACON TIP# 271-TSM CONG DIST. 8
2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
BIBB 311530
STATUS:
I-16@ SR 87/MLK JR.
LANDSCAPING/
NC:EMJ~N~f),.
PROJECT MILEAGE : .00 -
MANAGER: E. LAWS
LGPA NOT APPLICABLE
MACON TIP i 250-TSM
CONG DIST. 8
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
BIBB 311580
STATUS:
I-475 AT REST AREA# 19, MP 7.7 NB REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: J. GARLAND N9T APPLICABLE
DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
BIBB 311590
STATUS:
I-475 FM I-75 TO SR-19/US 41/MONROE
.....
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, S'I'.Rift di%i:LcoNG PROJECT MILEAGE : 14. 00 - EXIST. LANES: 2 /PROPOSED LANES!)i:: ....... .
MANAGER: L. SEABROOK LGPA NOT APPLICABLE
I-STATE MAt,irnr
AbMm fti~bif
BIBB 311670
STATUS:
I-475, SEWER SYSTEM IN REST AREAS REST AREA/ MAINTENANCE PROJECT MILEAGE : .10 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK
NOT APPLICABLE
tf:BbNG
FUND SOURc:i{\:k;ATE
FEDERAL . -it!c;ft#j{y
BIBB 311750
STATUS:
NAPIER AVE OVER I-75; I-75 OVER RAMP TO SR 87
BRIDGES/ RECST~ OR REHAB. PROJECT MILEAGE : .00 MANAGER: BEN BUCHAN (M) REQ MACON DO UTIL 10-7-93; BIBB SGN 10-20-93 PUBLIC UTIL
CONG DIST:\8 & 2
FUND SOURCE: FEDERAL HIGHWAY
22-Feb-1994 Page 7
FISCAL YEAR
COST ESTS
PE 1987 UNDERWAY
ROW 1989 UNDERWAY
CONST 1997
$ 22468
FED SHARE $ 17974
GA. SHARE $ 4494
0TH SHARE $
PE 1992 ROW 1997 CONST
UNDERWAY $ 5000 AFTER 97
PE NONE $
0
ROW NONE $
0
CONST 1995
$
70
FED SHARE $
56
GA. SHARE $
14
0TH SHARE $
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1995 $ 2000
FED SHARE $ 1800
GA. SHARE $
200
0TH SHARE $
PE 1993 UNDERWAY
ROW NONE $
0
CONST 1995 $ 4790
FED SHARE $ 4311
GA. SHARE $
479
0TH SHARE $
PE NONE $
0
ROW 1994
$
0
1995
$
100
FED SHARE $
90
GA. SHARE $
io
0TH SHARE $
PE 1995 $
10
ROW 1995
$
1
CONST 1996
$
319
FED SHARE $
287
GA. SHARE $
32
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
-Page 8
-PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-------------------------------------------------------------------------------
BIBB
HOUSTON RD FM WALDEN/SARDIS CH RDS TO Slt. 11
MACON
-T-I-P--f--1-5-0--M--C----------------------P-E--1-9-9-2-----U-N-D-ER-W--AY
350820 MINOR WIDEN & RESURF / RECST. OR REHAB. \\,
CONG DIST. 8
ROW LOCL
PROJECT MILEAGE : 3.20 - EXIST. LANES: 2,\/!>ROPOSED LANES: 2
CONST 1997
$
757
MANAGER: GORDON BROWN(M)
fj)}.
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE$
606
STATUS: BIBB COUNTY SIGNED ROW, UTILITIES & D?!PtiRS\11:,,,17-92
FEDERAL HIGHWAY ADMIN FONDS
GA. SHARE$
151
0TH SHARE$
BIBB 350960
STATUS:
,:fWtl~R SR 74 FM W/I-475 TO COLUMBUS RD_
OVER I-:it;h
TURN LANES/ SAFETY
PROJECT MILEAGE : 1. 30 - EXIsj{;'\iliis: 4 /PROPOSED iJfuEs: 5
MANAGER: BEN BUCHAN
REQ MACON DO UTILITIES lQfi~t:~iP COUNTY REFUSED
MACON TIP f 339-MC
CONG DIST. 8 & 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 ROW 1997 CONST
UNDERWAY
$
110
AFTER 97
BIBB 371030
STATUS:
'sdv~ LANDSCAPING OF CIVIC
FOR PARK IN MACON
LANDS CAP ING / ENHANCEMEN'i'\. .
MPRAONJAEGCETR: MCILOERAAGECOO: K . 00 - idtf.s---T . LANES: 0 /PROPO. -s---l-!---:-.:6.., w.ill:is: 0
TO BE DONE BY CONTRACT
BIBB 371320
STATUS:
PEDESTRIAN PLAZA TO GEORGIA MUSIC BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: UNKNOWN
BIBB 3Vl0ll
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN BIBB MPO AREA MANAGER: STEVE KISH.
BIBB 3Vl012
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIE IN BIBB MPO AREA MANAGER: STEVE KISH
CONG DIST. 2 & 8 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
DIST. 2
PE 1995
$
60
ROW LOCL
CONST 1995 $ 240
FED SHARE $
192
GA. SHARE $
12
0TH SHARE $
60
PE LOCL
ROW LOCL
CONST 1995 $ FED SHARE $ GA. SHARE $ 0TH SHARE $
1250 1000
250
}GONG Dis=;@ij & 2
ELDERLY
& ,l'>iMMiilb
~:;TAL
1995
$
FED SHARE$
39 31
Jili~-~~ &os
GA. SHARE$
4
0TH SHARE$
4
i/' 'j}k:ONG DIST. 8.
FUND souRciiiVii:6ERLY &
FEDERAL -:TRANSIT ADMIN
1996
$
41
FED SHARE$
33
GA. SHARE$
4
0TH SHARE$
4
111!!1:!!!!1 1!11!1'!1::!11
l!l!ffl!l!!!
mmm
~
cm=:, fflm
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BUTTS 311380
STATUS:
I-75@ SR 36 FM 0.5 MI SW/I-75 TO 0.55 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.10 - EXIST. LANES: MANAGER: B FERGUSON (C) DPT TP [AU 1-19-94
CONG DIST. 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
BUTTS 332060
STATUS:
SR 16 OVER YELLOW WATER CREEK REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: GORDON BROWN REQ BUTTS COUNTY DO
CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 9
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1994
$ 10181
CONST 1996
$ 4577
FED SHARE $ 4119
GA. SHARE $
458
0TH SHARE $
PE 1994 UNDERWAY
ROW 1995
$
1
CONST 1996
$
741
FED SHARE $
593
GA. SHARE $
148
0TH SHARE $
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CARROLL 350660
STATUS:
CS 824/STEWART ST/CARROLLTON@ CURTIS REHABILITATION OF THE EXISTING BRIDGE PROJECT MILEAGE : ,25 MANAGER: BILL MCVEY CARROLLTON PREV SGN 3-20-92 ROW &
LANES.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 10
FISCAL YEAR
COST ESTS
PE 1991 UNDERWAY
ROW LOCL
CONST 1996 $ 303
FED SHARE$ 242
GA. SHARE$
61
0TH SHARE$
ll!l!!!!m!il
!!l.!!ffl!!
~
~
f>\.>. PAN
~
'l
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CHATTAHO SR 1 @ HICHITEE CREEK
..
321580 REPLACEMENT OF THE EXISTING BRIDGES (S). <NQ. ADDED LANES.
PROJECT MILEAGE : .30
STATUS: ~t~~~~T~ c~iN~~~;LSib; LGPA NOT APPriBlmifh
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322160 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 11
FISCAL YEAR
COST ESTS
PE 1990 UNDERWAY
ROW NONE
$
0
CONST 1996
$
865
FED SHARE $
692
GA. SHARE $
173
0TH SHARE $
~tKv12i> CHATTAHO COUNTY OPERATED PUBLIC TRANSIT
3Bl204 TRANSIT FACILITIES / OPERATIO.N,~f' :: FUNDS RECIPIENT: CHATTAHOOCHEE/?}':::':':'= MANAGER: STEVE KISH
STATUS:
CONG DIST. 2
OPERATING 1995 $
41
FUND SOURCE: RURAL TRANSIT
FED SHARE $
23
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
18
CHATTAHO COUNTY OPERATED PUBL~a(;filfuSIT SERVICE 3Bl205 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHATTAHC>OQH,EE MANAGER: STEVE KISH STATUS:
CONG DIST. 2
OPERATING 1996
$
43
FUND SOURCE: RURAL TRANSIT
FED SHARE $
24
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
19
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 12
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
C-PL-A-. YI-.T-NO-ON--. --I--7-5--F-M---I--6-7-5--P-TOR-O--SJER-C-T-7~/UD-SA-T-A4-1-/H-E-N--R-Y-----------------L-I-G-H-T-I-N-G-)--------A-T-L-A-N-T-AC-O-MT-MI-P-EN-fT-S-C-L---R--1-2-------------------P-EY-E-A1-R9-9-6------$-E-S-T-S--0
31097X WALLS/ RECST. OR REHAB.
CONG DIST. 3
ROW NONE
$
0
PROJECT MILEAGE: 7.80 - EXIST.
CONST
AFTER 97
MANAGER:
FUND SOURCE: NAT'L HIGHWAY
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
310976-IS AN ASSOCIATED PROJECT.
. .. ,
"
111!11!!!11!!1
~
~
~
~
~
0
~
COUNTY P,I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COWETA 31171W
STATUS:
COWETA 321310
STATUS:
CALL BOXES ON I-85 FM ALABAMA TO SR 74/FtJLTON .. SEE HARRIS
~~~~ ,I~~:Gio~s:~gc:::r~~IST. LANES: 0 ;,~()POSED LANES: 0
MANAGER: BURT RIDDLE
;~;~i.ss:-
~~:;I~fiiff~o SR 16, US 27 ALT FM EVANS
RECONSTRUCTION & WIDENING
PROJECT MILEAGE : 1.33
MANAGER: GORDON BROWN
.....-:-:--.:-::.
COWETA COUNTY SIGNED. FOR qffzjf'Jifi;s 11/7 /89,
CONG DIST. 7 & 3 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
COWETA 321450
STATUS:
SR 14/ us 29A/ GREENVt:tiiM ST @ A&WP RR REHAB. OF THE EXISTING B~JpGE(S). FROM 2 LANES Td',:41:~ES. PROJECT MILEAGE : .34 MANAGER: GORDON BROWN COUNTY SGN 7-20-88 FOR UTILitf:ti:;} C::ITY LGPA N'<f.ii/iJ?~irCABLE.
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COWETA 322390
STATUS:
SR 34/NEWNAN FM SR 34 BYP TO I-85 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6
PROJECT MILEAGE : 1.25
RJtJusti:r MANAGER: M. REYNOLDS
NEWNAN SGN 12-7-92 PUBLIC UTILITIES; COUNl'X. ..,. .-: .... 12-10-92
DIST. 3
FUND SOURCE: SURFACE TRANSPORT. -F:-:-EDERAL HIGHWAY ADMIN FUNDS
COWETA 322400
STATUS:
SR 34 BYP/NEWNAN FROM SR 70/INCLUDE CSX RR BRii&t TO
34
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. SR
PROJECT MILEAGE : 3. 35
MANAGER: M. REYNOLDS (C)
NEWNAN SGN 12-7-92 UTILITIES; COUNTY REFUSED 12-10-92
\\
. \})\coNG DI$i::~: 3
FUNo::;amnfa = suRFACE TR1illi1i!Mif: FED~.)jhGHWAY AOMINiFfu.t6if
22-Feb-1994 Page 13
FISCAL YEAR
COST ESTS
PE
$
0
ROW NONE
$
0
CONST 1997
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1993
UNDERWAY
ROW 1993 UNDERWAY
CONST 1995
$
683
FED SHARE $
546
GA. SHARE $
137
0TH SHARE $
PE 1986 UNDERWAY
ROW 1994
UNDERWAY
CONST 1996
$ 1215
FED SHARE $
972
GA. SHARE $
243
0TH SHARE $
PE 1992
UNDERWAY
ROW 1995
$
17
CONST 1997
$
905
FED SHARE $
724
GA. SHARE $
181
0TH SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY
$
559
AFTER 97
COWETA 331730
STATUS:
CR 555 OVER MESSIERS CREEK NORTH OF JCT SR 14. REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C) COWETA SGN DO ROW, UTILITIES, DETOURS & PE 10-19-93
COWETA 331740
STATUS:
CR 301/SHADY GROVE CH. RD@ WAHOO CREEK 5.8 MI NW OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .22 MANAGER: GORDON- BROWN(C) SEND LGPA 10/94
FOND souRcEk liHHDGE PROGRAM
FEDERAL Jifoifr'l'AY ADMIN
CONG DIST. \3
ADMIN FUND SOURCE: BRIDGE);t~:~
FEDERAL HIGHWAY
FUNDS
PE LOCL
ROW LOCL
:(CONST 1995
$
137
FED SHARE $
110
GA. SHARE $
27
0TH SHARE $
PE 1995
$
10
ROW LOCL
CONST 1997
$
400
FED SHARE $
320
GA. SHARE $
80
0TH SHARE $
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COWETA 331920
STATUS:
CR 547/GORDON RD@ LITTLE WHITE OAK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: GORDON BROWN
COWETA COUNTY SIGNED
& DETOURS.
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 14
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW LOCL
CONST 1995
$
341
FED SHARE$
273
GA. SHARE$
68
0TH SHARE$
COWETA 332090
STATUS:
SR 74/85@ KEG CREEK EAST OF ADDITION OF A PASSING LANE. _PROJECT MILEAGE : . 30 MANAGER: GORDON BROWN SEND LGPA IN 1995
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 33Y090 IS AN ASSOCIATED PROJECT.
PE 1994 UNDERWAY
ROW 1997
$
5
CONST 1997
$
110
FED SHARE $
88
GA. SHARE $
22
0TH SHARE $
COWETA 332170
STATUS:
SR 14/US 29 INTERSECTION PROJECT MILEAGE: .00 MANAGER: GORDON BROWN(M) SEND LGPA IN 199
CONG DIST. 3
3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1996 $
58
CONST 1997 $.
83
FED SHARE$
75.
GA. SHARE$
8
0TH SHARE$
COWETA 332180
STATUS:
SR 16 AT SR 54 INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: GORDON BROWN(M) SEND LGPA IN 199
DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE- $.
0
ROW 1996
$
42
CONST 1997
$
83
FED SHARE"$
83-
GA. SHARE $
. 0TH SHARE $
COWETA 33Y090
STATUS:
SR 74/85@ KEG CREEK E OF SENOIA-FOR UNKNOWN / UNKNOWN .
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED MANAGER:
FUNo:=m:mi&i: BRIDGE PRO~~=/'
FED~dfrGHWAY ADMINif~bs . --
3_32d.6)is AN Assocfifa,ii:fi=:fi~.OJECT.)
PE 1994 UNDERWAY
ROW NONE
$
0
CONST 1997
$
120
FED SHARE $
96
GA;, SHARE $
24
0TH SHARE $
COWETA 342830
STATUS:
CR 252/SMOKEY ROAD OVER MOUNTAIN CREEK OVERFLOW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C) COWETA SGN DO ROW, UTILITIES, DETOURS & PE 10-19-93
--:-:-:
',}'\CONG DIST.
-=-:t::i:~)}::;:;:;,:,
FUND SOURci:{:~ii'DGE PROGRAM FEDERALi!foftwAY ADMIN
PE LOCL
ROW LOCL
:::::::{tbNST 1996
$ 102
FED SHARE $
82
GA. SHARE $ 20
OTH SHARE $
COWETA 342900
STATUS:
CR 251/WAGERS MILt ROAD@ WAHOO CREEK 7.6 MI NW OF NEWNAN
REPLACEMENT OF _THE EXISTING BRIDGES (S) . NO ADDED LANES.
PROJECT MILEAGE : .22
MANAGER: GORDON BROWN(C)
SEND LGPA 10/94
-
CONG DIST.\3.
~~~~~u!i~~w!~Ii!~!f~~~
PE 1995 $
11
ROW LOCL
CONST 1997
$
440
FED SHARE $ 352
GA. SHARE $
88
0TH SHARE $
~
~
~
fg\-Jl
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COWETA 350980
STATUS:
SR 34 AT FIVE EXISTING MEDIAN OPENINGS
TURN LANES/ SAFETY PROJECT MILEAGE : .00 - EXIST. MANAGER: GORDON BROWN(M) "SEND LGPA IN 199
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 15
FISCAL YEAR
COST ESTS
PE 1994 UNDERWAY
ROW 1996 $
1
CONST 1997
$
624
FED SHARE $
562
GA. SHARE $
62
0TH SHARE $
COWETA 370781
STATUS:
CR 157/ROCKAWAY RD IN SENOIA REPLACEMENT OF THE EXISTING c~~1/'~~-~,1 PROJECT MILEAGE : .30 MANAGER: GORDON BROWN CITY OF SENOIA SIGNED
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$
374
FED SHARE$ 299
GA. SHARE$
75
0TH SHARE$
COWETA 370824
STATUS:
CR 74/STALLINGS ROAD REPLACEMENT OF THE PROJECT MILEAGE : .19 , MANAGER: GORDON BROWN(C) SEND LGPA 10/94
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 $
8
ROW LOCL
CONST 1996
$
150
FED SHARE $
120
GA. SHARE $
30
0TH SHARE $
COWETA 370825
STATUS:
CR 252/SMOKEY RD OVER MOUNTAIN CK NE OF .REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C) COWETA SGN DO ROW, UTILITIES, DETOURS &
DIST.. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996
$
266
FED SHARE $ 213
GA. SHARE $
53
0TH SHARE $
COWETA 370826
STATUS:
CR 74/STALLINGS ROAD@ KEG CREEK 1.5 MIN OF REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .21 MANAGER: GORDON BROWN(C) SEND LGPA 10/94
:{CONG Disif[j ~~~~ll~tw:~I~~I:t~zi:>
PE 1995 $
8
ROW LOCL
CONST 1997
$
300
FED SHARE $
240
GA. SHARE $
60
0TH SHARE $
COWETA 370910
STATUS:
CR 157@ LINE CRK & LINE CRK OFLW ... ALSO FAYETTE CO REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: GORDON BROWN
COWETA & P'TREE CITY SGN 8/91 ROW/UTIL/DETOURS;FAYETTE N/A
PE 1992 UNDERWAY
ROW LOCL
::ARE i FciNo souRcil1::gif~GE PROGRAM\:
:
9 ,;: t:oNs;E~
11
fl;I!: ~!:: i ~~g~~f:~l~!~s~~i~E;u:~~mi8
~~H
1255 1004
251
COWETA 371240
STATUS:
CHATTAHOOCHEE-FLINT HERITAGE HIGHWAY HISTORIC PRESERVATION BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BOB MOORE LGPA TO BE DONE BY CONTRACT
CONG DIST. ,,3 & 2
ii: FUND souRcE: TRAN it'k~cE.
FEDERAL HIGHWAY AOM!N FUNDS
PE 1995 $
10
ROW 1995 $
4
CONST 1995
$
138
FED SHARE$
1-10
GA. SHARE$
2
0TH SHARE$
30
COUN_TY P.I.NO.
DESCRIPTION PROJECT DATA
COWETA 371300
STATUS:
CR 150/BURTUS HUNTER ROAD@ REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .20 MANAGER: GORDON BROWN(C) SEND LGPA 10/94
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COWETA 371302
STATUS:
CR 82/GOODWYN ROAD@ WHITE OAK REPLACEMENT OF THE EXISTING Q~~u~~~. PROJECT MILEAGE : .22 MANAGER: GORDON BROWN(C) SEND LGPA 10/94
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COWETA, 371304
STATUS:
CR 144/ROCK .liOUSE REPLACEMENT OF THE PROJECT MILEAGE: .20 MANAGER: .GORDON BROWN (C) SEND LGPA 10/94.
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COWETA 371306
STATUS:
CR 21/HAPPY VALLEY ROAD @ BROWNS CREEK 6 MI N OF NEffl.i.i{ijl> :, REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES{:'" PROJECT MILEAGE : .20 MANAGER: GORDON BROWN(C) SEND LGPA 10/94
rr 1BoNG DIST. 3
FUND SOURCE: BRIDGE PROGRAM !J;EDERAL HIGHWAY ADMIN FUNDS
COWETA 371308
STATUS:
CR 239/BOHANNON ROAD@ NEW RIVER 1 MIN OFG~fVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED -LANES. PROJECT MILEAGE : .21 MANAGER: GORDON BROWN(C) SEND LGPA 10/94
22-Feb-1994 Page 16
FISCAL YEAR
COST ESTS
PE
$
8
ROW LOCL
CONST 1997
$
125
FED SHARE $
100
GA. SHARE $
25
0TH SHARE $
PE 1995
$
9
ROW L9CL
CONST 1997
$
400
FED SHARE $
320
GA. SHARE $
80
0TH SHARE $
PE 1995
$.
8
ROW LOCL
CONST 1996
$
150
FED SHARE $
120
GA. SHARE $
30
0TH SHARE $
PE 1995
$
8
ROW LOCL
CONST 1997
$
238
FED SHARE' $' 190
GA. SHARE $
48
0TH SHARE$
PE 1995
$
8
ROW LOCL
CONST 1997
$
300
FED SHARE $
240
GA. SHARE $
60
0TH SHARE $
"
~
~
l!ll!!!ffl'.l!
~ mmm
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CRAWFORD SR 42@ CULPEPPER CREEK W OF SR 7
331600 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : .oo
MANAGER: GORDON BROWN
STATUS: CRAWFORD COUNTY SIGNED 6-.6-92 FOR
CONG DIST, 3
FUND SOURCE: BRIDGE. PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CRAWFORD COUNTY OPERATED PUBLIC TRANSIT 3B1209 TRANSIT FACILITIES/
FUNDS RECIPIENT: CRAWFORD MANAGER: STEVE KISH
STATUS:
CONG DIST, 3 & 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CRAWFORD COUNTY OPERATED 3B1210 TRANSIT FACILITIES
FUNDS RECIPIENT: MANAGER: STEVE KISH STATUS:
CONG DIST. 3 & 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 17
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW 1995
$
1
CONST 1996
$
366
FED SHARE $
293
GA. SHARE $
73
0TH SHARE $
OPERATING 1995
$
63
FED SHARE $
35
GA. SHARE $
0TH SHARE $
28
OPERATING 1996
$
65
FED SHARE $
36
GA. SHARE $
0TH SHARE $
29,,.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
STATUS:
I-75 UPGRADE REST AREAS J13 & 14 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE: .00 - EXIST. LANES: MANAGER: J. GARLAND NOT APPLICABLE
CONG DIST. 2
FUND SOURCE:- I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
DOOLY . 311675
STATUS:
I-75, SEWER SYSTEM IN REST REST AREA/ MAINTENANCE PROJECT MILEAGE : 1.00 MANAGER: L. SEABROOK NOT APPLICABLE
CONG DIST. 2 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
DOOLY 321610
STATUS:
SR 90@ SANDY MOUNT REPLACEMENT OF THE PROJECT MILEAGE : .19 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
DOOLY 321614
STATUS.:
SR 90@ LITTLE REPLACEMENT OF THE EXISTING PROJECT MILEAGE: .19 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88
FUND SOURCE: BRIDGE PROGRAM FEDERAL ,.,,-.--.-...:----:-::::- HIGHWAY ADMIN .FUNDS
DOOLY. 321616
STATUS:
SR 90 .@ TURKEY CREEK TRIBUTARY . REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .15 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88 FOR UTILITIES.
:(iJ[f:=:?tccoNG Dis:Hfii
FUND'.:l\i61;r BRIDGE PRosf@lff//
FEP~dt:i:GHWAY ADMIN ttiNos
DOOLY. 321'618 .
STATUS:
SR. 90@ TURKEY CREEK
.
REPLACEMENT .OF THE EXISTING BRIDGES (S) . NO ADDED LANES.
PROJECT MILEAGE : .42
MANAGER: GORDON BROWN
DOOLY COUNTY SIGNED 4-25-88 FOR UTILITIES.
DOOLY 371210
STATUS:
CR 25 OVER HOGCRAWL CREEK 9 MI WES'l;' OF UNADILLA. REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. . PROJECT MILEAGE : . 21
MANAGER: GORDON BROWN(M) DOOLY SIGNED. FORROW, UTILITIES & DETOURS 10-21-93
2
'"iifuri SOUP.-!;,:~:::::li;GE PROGRAM / . FEDERAL..,H!GHWAY ADM IN FUNDS ...::::::/,. -::::::::-=:- :::::::::::::;:::::::::::
CONG DIST. <:2 FUND SOURCE: BRID<if/jkis~RAM FEDERAL HIGHWAY ADMIN
22-Feb-1994 Page 18
FISCAL YEAR.
COST ESTS
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1997
$ 3620
FED SHARE $ 3258.
GA. SHARE $
362
0TH SHARE $
PE NONE
$
0
ROW 1994
$
0
CONST1995
$
75
FED SHARE$
68
GA. SHARE $
8
0TH SHARE$
PE 1990 UNDERWAY
ROW 1995
$
8
CONST 1996
$
570
FED SHARE $
456
GA. SHARE $
114
0TH SHARE $
PE NONE
$
0
ROW 1995 $
8
CONST 1996
$
570
FED SHARE.$. '456
GA. SHARE$
114
0TH SHARE$
PE NONE
$
0
ROW 1995 $
8
CONST 1996
$
150
FED SHARE. $. 120
GA. SHARE $
30
0TH SHARE $
PE NONE
$
0
ROW 1995
$
8
{CONST 1996
$
640
FED SHARE $
512
GA. SHARE $. 128
0TH SHARE $
PE 1994
UNDERWAY
ROW LOCL
CONST 1996
$
290
FED. SHARE $ .. 232
GA. SHARE $
58
0TH SHARE $.
.
ll!lm!l:!l
ffl!!ml
l!ll!!l!ffl
I!!'!!!!!'!'!!!
~
~
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DOOLY 381219
STATUS:
CITY OPERATED PUBLIC.TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH
CONG DIST. 2
FOND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
DOOLY 381220
STATUS:
CITY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: CITY MANAGER: STEVE KISH
CONG DIST. 2
FUND, SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
DOOLY 381423
STATUS:
CITY OPERATED PUBLIC TRANSIT FACILITIES/ FUNDS RECIPIENT: CITY MANAGER: STEVE KISH
CONG DIST. 2
FOND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
DOOLY 381424
STATUS:
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH
DOOLY 3C2423
STATUS:
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF UNADILLA
MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 2
FUND SOURCE: RURAL TRANSIT
(fFfE\;D::E:\R:{:A/:::L::: TRANSIT ADMIN FUNDS
22-Feb-1994 Page 19
FISCAL YEAR
COST ESTS
OPERATING 1995 $
13
FED SHARE$
8
GA. SHARE$
0TH SHARE$
5
OPERATING 1996 $
13
FED SHARE$
8
GA. SHARE$
0TH SHARE$
5
OPERATING 1995 $
33
FED SHARE$
20
GA. SHARE$
0TH SHARE$
13..
OPERATING 1996 $
34
FED SHARE$
20
GA. SHARE$
0TH SHARE$
14
1995
$
20
FED SHARE $.
16
GA. SHARE$
2
0TH SHARE$
2
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FAYETTE 321950
STATUS:
SR 92 S/FAYETTEVILLE FM MCBRIDE RD/I~:-. TO J MAYFIELD DR
RECONSTRUCTION & WIDENING FROM2 LANES T0:4 LANES.
PROJECT MILEAGE : 3. 38
:
MANAGER: M. REYNOLDS (M)
COUNTY REFUSED 7/9l;CITY SGN 10/92
ONLY
ATLANTA TIP f FY 3
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 20
FISCAL YEAR
COST ESTS
PE 1993 ROW 1996 CONST
UNDERWAY $ 2313 AFTER 97
FAYETTE 322357
STATUS:
ATLANTA TIP f FY 15 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW NONE
CONST
$
10
$
0
AFTER 97
FAYETTE 322358
STATUS:
SR 7 4 BICYCLE BRIDGE d~K(sR 7 4 IN PEACHTREE BRIDGES / NEW CONSTRUCTIQfi,. PROJECT MILEAGE : .00 MANAGER: GENE POWELL (C) ............ .
PEACHTREE CITY SGN ROW, UTIL)\ ~Q9"J
ATLANTA TIP f FY 14
CONG DIST. 3
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
FAYETTE 322650
STATUS:
SR 74 AT PASCHALL ROAD IN PEACHTREE CITY
~:;~~~c!i~:A~~~o~~E~TE,I~fEiiNEs: 2 /PROPOSEO :mil~ 2
MANAGER: BURT RIDDLE
REQ PEACHTREE CITY DO ROW & UTIL 1-11-94
. {'?\ATLANTA TIP f FY 9 \ONG DIST. 3
')}';UND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS -
:-:-:-:
FAYETTE SR 74 AT CRABAPPLE/PEACHTREE, TYRONE AND JENKIN$ ,:ROADS
ATLANTA T-fi]t FY 19
:xi~/ 322670
0
!;;~~~;;i~:,~:c~L~~T:
~~:~; 2 /PROPOSED LANES(:[:;::::::::::< t 99ff9. DI_~f) $
STATUS: ~~~~~:T:;~I~Ig~i~TIONS
!:~~trn~~~w!~T~M:~1~iii>
FAYETTE 331930
STATUS:
SR 85 CONN FM CR 168 TO SR 85; PPL FM 4.0 TO 6.0RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 3.90 MANAGER: K FULBRIGHT (M) REQ BROOKS DO UTILITIES 5-3-93; FAYETTE SGN 6-2-93 UTILITIES
A TIP f Fii :f:;::= DIST. 3 ...,,:;::=:;::=:==:=:==:===
Ftfuo
)Ht souRciiii/i
ACE
FEDERAL ii:i:GiiWAY
PE LOCL
ROW LOCL
CONST 1995
$
754
FED SHARE $
603
GA. SHARE $-
48
0TH SHARE $
103
PE 1994
UNDERWAY
ROW LOCL
CONST 1995
$
130
FED SHARE $
130
GA. SHARE $
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
173
FED SHARE $
173
GA. SHARE $
0TH SHARE $
PE 1993 ROW 1996 ,=,=:=::\/CON ST
UNDERWAY $ 2950 AFTER 97
FAYETTE 342800
STATUS:
SR 85 CONN FM SR 16 .IN SPALDING CTY N TO CR 168 IN BROOKS
RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 3. 34
-
MANAGER: GORDON BROWN(M)
SEND LGPA WHEN PROJECT IS ADDED TO CWP
ffp ATLANTA
t FY 17
CONG DIST."3-
FUND souRcE: suRFA8~:}4~sPORT. FEDERAL HIGHWAY ADMINFUNDS
PE 1996
ROW CONST
$
70
AFTER 97
AFTE~ 97
"
lll!!l!m!il
~
~
~
~
,. . . ., ; i
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FAYETTE 370920
STATUS:
CR 275/SHERWOOD RD@ WHITEWATER CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .20 MANAGER: GORDON BROWN FAYETTE COUNTY SIGNED 9-18-91 FOR
ATLANTA TIP i FY 11
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 21
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 301
FED SHARE$ 241
GA, SHARE$
60
0TH SHARE$
FAYETTE 3V1023
STATUS:
ELDERLY AND DISABLED VEHICLES TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: .AGENCIES MANAGER: STEVE KISH NOT APPLICABLE
CONG DIST. 3
CAPI_TAL 1995
$
10
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
FAYETTE 3V1024
STATUS:
ELDERLY AND DISABLED TRANSIT PROJECTS/ FUNDS RECIPIENT: ~~-M~T~~,c::~~
MANAGER: STEVE KISH NOT APPLICABLE
CONG DIST. 3
CAPITAL 1996
$
10
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
8
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 31171Z
STATUS:
CALL BOXES ON I-85 FM ALABAMA TO SR UNKNOWN/ UNKNOWN PROJECT MILEAGE: ,00 - EXIST. LANES: MANAGER:
CONG DIST. 7 & 3
0 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 22
FISCAL YEAR
COST ESTS
PE
$
0
ROW NONE $
0
CONST 1997
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
'
mm=,
~
~--....>,!
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HARRIS 311710
STATUS:
CALL BOXES ON I-85 FM ALABAMA TO SR 74/P:'.ULTON
~~;~~~~~~~!G~M~R~~~Ni!I~T~~~~S: 0 ';t~QPOSED LANES: 0
MANAGER: BURT RIDDLE NOT APPLICABLE
.:-:
CONG DIST. 7 & 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
HARRIS 31172X
STATUS:
_;:i~ CALL BOXES ON I-1ss FM sR 22/Musc:dii[ijg I-as ..
t;1UscoGEE"
. :m~~: ;= ~~~~ ,!~:~~~~ 00 - EXISTS
0 /PROPOSED ~ k s .-..:- : 0
MANAGER:
CONG DIST. 3 & 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
HARRIS 331590
STATUS:
irnat SR 116 @ SPARKS CREEi
SR SSW
REPLACEMENT OF THE EXISi;ING BRIDGES (S). NO
PROJECT MILEAGE : ,12
MANAGER: GORDON BROWN
HARRIS COUNTY SIGNED 6-4-91
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
HARRIS 342780
STATUS:
SR 1/US 27@ SR 354 IN PINE MOUNTAIN
INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .98 - EXIST. LANES: 0 /PROPOSE!;)
MANAGER: GORDON BROWN COUNTY SGN 2-12-92 FOR ROW & UTILITIES
(T&',$. 1n~:61\f{
,={CONG DIST. 3 ')GRIP PROJECT ._._. FUND SOURCE: HWY. SAFETY
F:E->:DE. RAL HIGHWAY ADMIN FUNDS
HARRIS 371220
STATUS:
CR 268/KING GAP ROAD @ CRAWFORD CREEK NEAR MERl)ifETHER CO LN REPLACEMENT OF THE EXISTING BRIDGES (S) . NO ADDED LANES ..<::\: PROJECT MILEAGE : .20 MANAGER: GORDON BROWN(M) HARRIS CO SGN ROW, UTILITIES & DETOURS 9-7-93
22-Feb-1994 Page 23
FISCAL YEAR
COST ESTS
PE
$
20
ROW NONE
$
0
CONST 1997
$
700
FED SHARE $
630
GA. SHARE $
70
0TH SHARE $
PE
$
0
ROW NONE
$
0
CONST 1997
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1992
UNDERWAY
ROW 1994 UNDERWAY
CONST 1995
$
273
FED SHARE $
218
GA. SHARE $
55
0TH SHARE $
PE 1994
UNDERWAY
ROW LOCL
CONST 1995
$
587
FED SHARE $ :528
GA. SHARE $
59
0TH SHARE $
._,."'~: ,:,.:~~
PE 1994
UNDERWAY
ROW LOCL
CONST 1997
$
337
FED SHARE $
270
GA. SHARE $
67
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 24
PROJECT LISTING -BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
------------------------------------------------------------------------------
-C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S---.
HENRY I-75 FM I-675 TO SR 7/US
LIGHTING)
ATLANTA TIP lt CL-R 12
PE 1996
$
79
310976 WALLS/ RECST. OR REHAB.
CONG DIST. 3
ROW NONE
$
0
PROJECT MILEAGE : 7.80
CONST
AFTER 97
MANAGER: J. GRAYBEAL
FUND SOURCE: NAT'L HIGHWAY
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
31097X IS AN ASSOCIATED PROJECT.
HENRY 311120
STATUS.:
SR 20/SR 81 OVER I-75 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .30 MANAGER: J. GRAYBEAL COUNTY SIGNED 11-14-85
UTILITIES.
ATLANTA TIP lt HE 1 CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1987
UNDERWAY
ROW 1995
$
700
CONST 1997
$ 1863
FED SHARE $ 1677
GA. SHARE $
186
0TH SHARE $
HENRY 311760
STATUS:
HUDSON BR RD/EAGLES BRIDGES/ RECST. OR PROJECT MILEAGE : ,00 MANAGER: GENE POWELL (M) ATL TECH CTR SGN 1/3 CST
CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995
$
ROW NONE
$-
CONST 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE.$
10.
0 256 230
38 64
HENRY 321145
STATUS:
N-S 1-WAY PAIR/MCDONOUGH FM N/RA CONSTRUCTION OF NEW ROUTE WITH 2 PROJECT MILEAGE : 1.20 MANAGER: GENE POWELL (M) REQUESTED CITY OF MCDONOUGH TO
SOURCE: SURFACE TRANSPORT. HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
650
AFTER 97
HENRY 322680
STATUS:
i : T ~ ~ , ~ ~ T ~ ; NA i ~ ! ; ~ ~ : T D ? ~ ! ~ yMCDONOUGH
jj/@]f)!!~~~s~:~~~ilt HE 1
PROJECT MILEAGE : , 2 5 - EXIST. LANES : 2 /PROPOSED LANES f/3)')
MANAGER: BURT RIDDLE
FUNo'.tsBTMHE: HWY .,,sAFETt:tr:rr
HENRY SIGNED FOR ROW & UTILITIES 5-3-93
FEDEf,f-~i:-i itIGHwAY iIBMIN/@!tmoif
PE NONE
$
0
.ROW LOCL
CONST 1996
$
111
FED SHARE $
100
GA. SHARE $
11
0TH' SHARE $
HENRY 331360
STATUS:
SR 650/ HAMPTON RD FM I-75 EAST TO SR 42 IN LOCUST GROVE RECONSTRUCTION & WIDENING FROM 2 LANES T04 LANES. PROJECT MILEAGE : .70 MANAGER: M GANNAWAY (M) SIGNED COUNTY 8-6-85 FOR R/W & UTILITIES
PE ROW LOCL
rs ~:~~J!ilii~R~~~NTRANsPokMBt= tONST
$
32
AFTER 97
HENRY SR-155 NB 11.8-0.25 HENRY;SB 1.6-3.1/SEE SPALDING 33152X ADDITION OFA PASSING LANE.
PROJECT MILEAGE : 00 MANAGER: GORDON BROWN
STATUS: HENRY COUNTY SIGNED 5/15/89 FOR UTILITIES.
CONG DIST.::::3
FUND SOURCE: suRFi@;f{Jb.NsPoRT.
FEDERAL HIGHWAY MM!N FUNDS
331520 IS AN Ass6t!i,'I:'ED PROJECT.
PE 1992 ROW 1996 CONST
UNDERWAY
$
0
AFTER 97
.
,,
=
""""'
~
COUNTY
P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HENRY
331550
STATUS:
HENRY 331980
STATUS:
SR 20 EB FM MP 14.41 TO 13.21; WE MP 13:;2!1 TO 11. 74
ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 2.67
MANAGER: GORDON BROWN(M)
HENRY COUNTY REFUSED 7-2-92
.:'::'
(BY LETTER.C, ._.-'l;O:;: ~i,S,_~{UCT)
.;'/)d2:::.,-
Ei-i6}i'-~i; JONESBORO RD/CR 655 FM I-75 TO
PAIR rn"fadooNOUGH
RECONSTRUCTION & WIDENING FROM_ 2 '~~~S TO 4 LANES.''.'
./c'.'Cif'' PROJECT MILEAGE : 3, 20
MANAGER: GENE POWELL (M)
:,,(\:.
SEND LGPA WHEN PROJECT IS;":ADO.,E.D_'."ro CWP
ATLANTA TIP f HE 11
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t HE 7
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1'!194 Page 25
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1996
$
380
CONST 1997
$ 1131
FED SHARE $
905
GA. SHARE $
226
0TH SHARE $
PE 1995 ROW LOCL CONST
$
20
AFTER 97
HENRY
331990
STATUS:
iif:e;:mca JONESBORO ROAD/CR 65~"'
CREEK
-:"'-' ,','1,:',.
RBPLACt.MENT OF THE EXISTp4G BRIDGES (S) _ FROM 2 T: :;f .';ANES.
PROJECT MILEAGE : 00
\):~.
MANAGER: GENE POWELL (M) SEND LGPA IN 1996
'"";t{; ..f' ,, ---
.r.;-;_f:::i i,.
;;,s_ Ii>
ATLANTA TIP t HE 7
CONG DIST. 3
FUND SOURCE! BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE
ROW LOCL CONST
$
25
AFTER 97
HENRY 370940
STATUS:
CR 290/S HAMPTON RD OVER TOl'i'ALIGA RIVER SE HAMPTON (/'-;:,,;:,":(.\:/(;ATLANTA TIP t HE 15
REPLACEMENT OF THE EXISTING BRIDGES (S) NO APDED LANES"..',,,,
~~i~:M~~~: ~R()~(M)
-<-if\.:'.
REQ HENRY COUNTY DO ROW, UTILITIES & DETOURS. 3\:f:;f'i-:92
.,~;:-i:"cCoNG DIST. 3
:,,;,c;UND SOORCE: BRIDGE PROGRAM FEDl!lruU, HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW LOCL
CONST 1997
$
353
FBD SIIARE $
282
GA. SHARE $
71
0TH SHARE $
HENRY 370941
STATUS:
HENRY 3B1229
S'!'ATUS:
HENRY 3B1230
STATUS:
NALNUT TR:;tt:y CR '32/,URNER CSURCH RO OUER
CREEK
::::T: ;;;,. t HE 16
:it ~~~~~f~~.!~'~:I;:~,= REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : 50
BRIDGES (SJ
NO
ADDED
LANES.
<"-:'( _.,,;.~
}}}:; 'Y,_CQ-.. N,_,G~
OIS'.tj; ;3.
UTILIT>ES :;::;E~~U~~~~G:~gw;OR
6-1-92
~ ,,. , .,. ,,,...,.~;._.;
, -.:,;_}c\, ...
PE 1993
UNDERWAY
ROl'i' LOCL
CONST 1995
$
259
FED SHARE $
207
' GA. SHARE
0TH SHARE $
52
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HENRY
.-:'.,,d)'
.(d/ .'.~ ,-
sJc'QNG DIST. 3 '&':U.:-
' .'-'f:."f-,.,
. ;;:_'.':' ;,..,
QP!:MTING 1995
$
61
MANAGE,R: S'lEVE l<ISH
'>,<,,> FUND SOOR_c;t:i:-:J!,URAL TRANSIT
FEDE~":J~$':i:T ADMIN FUNDS,.
FED SHARE $
36
GA. SHARE$
0TH SHARE$
25
.,-,,\
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HENRY MANAGER: STEVE l<ISH
CONG DIST. '3 & 11 ;;' ..,,:-
FUND SOURCE: RURAid;hlrii~IT
OPERATING 1996
$
FED SHARE$
"37
FEDERAL
TRANSIT
A
'
t,_i,k,,.I,:N-
FUNDS
GA. SHARE$
0TH SHARE.$
26
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
HENRY 3C2229
STATUS:
ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HENRY MANAGER: STEVE KISH LGPA NOT APPLICABLE
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT, STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 3 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 26.
FISCAL YEAR
COST ESTS
CAPITAL 1995
$ . 20
FED SHARE $ 16
GA. SHARE$
2
0TH SHARE$
2
HENRY 3C2230
STATUS:
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HENRY MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 3 & 11
CAPITAL 1996
.$
52
FUND SOURCE: RURAL TRANSIT
FED SHARE$
42
FEDERAL TRANSIT ADMIN FUNDs
GA. SHARE$
5
0TH SHARE$
5
.HENRY 3V1032
STATUS:
ELDERLY AND DISABLED
TRANSIT PROJECTS/ FUNDS RECIPIENT: AGENCIES\,
MANAGER: STEVE KISH NOT APPLICABLE
CONG DIST. 6 & 4
CAPITAL 1995
$
11
FUND SOURCE: ELDERLY & DISABLED FUND FED -SHARE $
9
FEDERAL TRANSIT ADMIN FUNDS.
GA. SHARE $
1
0TH SHARE $
1
HENRY 3Vl033
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN HENRY COUNTY MANAGER: STEVE KISH NOT APPLICABLE
DIST. 6 & 4
CAPITAL 1996
$
12
SOURCE: ELDERLY & DISABLED FUND FED SHARE $
10
TRANSIT ADMIN FUNDS
GA. SHARE $
1
0TH SHARE $
1
,,
mmm,
l!!!!!llll !l!!!l!l!!!ll
l!!l!!!!!!I
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTIN~ BY COUNTY FY 1995/FY 1997
COMMENTS
HOUSTON 321590
STATUS:
SR 2 6 OVER ELKO CREEK
.....
REPLACEMENT OF THE EXISTING BRIDGES (S). 'ftq ADDED LANES.
PROJECT MILEAGE : . 19
.....
tJ:tt, ~!~~R~-1~~~~Nu~~~~xcEPT PVT UTLS-DEiiAii
csT PLANS)
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
HOUSTON 322460
STATUS:
SR 96 FM US 129@ BONAIRE
RECONSTRUCTION & WIDENING
PROJECT MILEAGE : 9.32
;~v:ibBihf~ =tG~~~AJwHi~~:~J~>
CWP
( INCL'!: lt:t{IDGES) 4 LANES.
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 27
FISCAL YEAR
COST. ESTS
PE 1990 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995
$
770
FED SHARE $
616
GA. SHARE $
154
0TH SHARE $
PE 1994 ROW 1996 CONST
UNDERWAY
$
729
AFTER 97
HOUSTON 322560
STATUS:
I-75 AT NEW WEST PERRY(BYJ?.ASS SOUTH OF PERRY
~~~s~R~ii~~~ ::;~g~~~~E{G~E~
LANES: o /PROPosi6!:!!l!k~: 4
MANAGER: J. GARLAND
::,(
.
HOUSTON COUNTY SIGNED 9-1-92
HOUSTON 332120
STATUS:
SR 26 OVER GA SOUTHERN AND FLA RAILROAD REPLACEMENT OF THE EXISTING BRIDGES{S). PROJECT MILEAGE : .42 MANAGER: GORDON BROWN SEE PI #321590
HOUSTON 332130
STATUS:
SR 26 OVER BURNHAM BRANCH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES._.,: PROJECT MILEAGE : .19 MANAGER: GORDON BROWN SEE PI #321590
HOUSTON 332140
STATUS:
SR 26 BRIDGE OVER CATNA BRANCH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .20 MANAGER: GORDON BROWN
SEE PI f321590
HOUSTON 332190
STATUS:
SR 247 DRAINAGE IMPROVEMENTS NEAR GREEN ST IN WARNER ROBINS MISCELLANEOUS IMPROVEMENTS/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: UNKNOWN REQ HOUSTON PUB UTL 12/93;WARNER ROBINS SGN PUB UTL 12/93
CONG DIST. 2 & 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1996
$
250
CONST 1996 $ 4800
FED SHARE $ 3840
GA. SHARE $
960.
0TH SHARE $
DIST. 2
FUND SOURCE: BRIDGE PROGRAM JfEQ;J;;RA.t,_ HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW 1993 UNDERWAY
CONST 1995
$
852
FED SHARE $
682
. GA. SHARE $
170
0TH SHARE $
PE NONE $
0
ROW 1993 UNDERWAY
CONST 1995
$
512
FED SHARE $
410
GA. SH~ $
102
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
:-:-:::,:toNST 1995
$
301
FED SHARE $
241
GA. SHARE $
60
0TH SHARE $
CONG DIST .-:',,g & 2 FUND souRcE: suRFK8iiffusPORT.
FEDERAL HIGHWAY J\DMIN FUNDS
PE 1994
$
15
ROW NONE
$
0
CONST 1995
$
440
FED SHARE $
352
GA. SHARE $
88
0TH SHARE $
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF.TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HOUSTON 342340
STATUS:
sR 247C FM HOUSTON LAKE RD TO SR 247/INGL INTER. IMPROVEMENT
::;~~~c!i~:A!~~o~~~TE,I~~E~ES: 5 :';t~QPOSED LANES: 5 MANAGER: GORDON BROWN SGN ROW & UTILITIES 5/18/88
W. ROBINS TIP ft 1985-6 CONG DIST. 8 & 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY .ADMIN FUNDS
HOUSTON 342930
STATUS:
CARL:A}~;:;~l ! ELBERTA RD FM HOUSTON RD TO
1
: : -=~~R ROBINS
RECONSTRUCTION & WIDENING FROM:2=iillES TO 4 LANES.
PROJECT MILEAGE : 1.20
MANAGER:
CONG DIST. 2 & 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 28
FISCAL ~ YEAR
COST ESTS
PE 1992
UNDERWAY
ROW LOCL
CONST 1996
$
650
FED SHARE $
585
GA. SHARE $
65
0TH SHARE $
PE ROW CONST
$
30
AFTER 97
AFTER 97
HOUSTON 350,830,
STATUS:
s. DAVIS DR FM RANDOLPif(iVE TON/DEMON
RECONSTRUCTION & WIDENit:fr/JfROM 4 LANES
PROJECT MILEAGE: .47
MANAGER: GORDON BROWN
:: /\,::
WARNER ROBINS SGN 12-5-91 FO!(
W. ROBINS TIP ft 1986-5 CONG DIST. 8 & 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
HOUSTON 350900
STATUS:
/~~;~~ Ri~~ ;~~NL~E;M
o!L
SIDE & N' SIDE FM GREEN<:1g:/l!lvt~ <i::1=::::::::li~oN!o~i:~. T!P t 1986-4
PROJECT MILEAGE: .30 - EXIST. LANES: 4 /PROPOSEp:fJWfs: 5 MANAGER: GORDON BROWN WARNER ROBINS SGN 1-28-93 IF AGREE ON CONC~I>T[\
FUND SOURCE: HWY. SAFETY. FEDE-:-:R-;-.-A-..L. HIGHWAY ADMIN. FUNDS
HOUSTON 350930
STATUS:
SR 127 FM CR 272/KING'S CHAPEL RD TO PERRY CIT;(:t.IMITS
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PRO.IBCT MILEAGE : .69
MANAGER: RAY METTS
;;;::::
PERRY REFUSED 11-11-92/COUNTY REFUSED 11-17-92/REQ cos~
CONG DIS'iiffa & 8
F~;:::::~aiicii:: SURFACE TRl&'#bl: "\i[i:GHWAY. AbMIN)ttilios
PE 1992
UNDERWAY
ROW LOCL
CONST 1995
$
531
FED SHARE $
425
GA. SHARE $
106
0TH SHARE $
PE NONE
$
0
ROW LOCL
CONST 1995
$
652
FED SHARE $
587
GA .. SHARE $
65
0TH SHARE $
PE 1993 ROW 1996 CONST
UNDERWAY
$
717
AFTER 97
HOUSTON HISTORIC DEPOT RESTORATION & LINEAR PARK IN WARNER ROBINS 371020 : MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: CORA COOK STATUS: TO BE DONE BY CONTRACT
HOUSTON ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 3Vl014 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN W. ROBINS MPO AREA _MANAGER: STEVE KISH STATUS:
):#{ROBINS TIP 11/[4
:):ONG DIST. 8. &:2:t
i&No souRciHI \i!ifurn . ENHANCE.
FED~ . .1tfoiiWAY ADM IN
w. ROB;!~ITIP t 1-16
CONG DIST. ,g & 2 FUND SOURCE: ~u1v1~,'.t..tt._:. FEDERAL TRANSIT
1995
$
8
LOCL
1995
$
242
FED SHARE $
194
GA. SHARE $
2
0TH SHARE $
50
CAPITAL 1995
$
15
FUND FED SHARE$
12
GA. SHARE"$
2
0TH SHARE$
2
:0
~
~
~
~
~
~
~
ll\'f,.~111'",.l
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 29
FISCAL .YEAR
COST ESTS
HOUSTON 3Vl015
STATUS.:
ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN W. ROBINS MANAGER: STEVE KISH
W. ROBINS TIP# 1-16(1)
CONG DIST. 8 & 2
CAPITAL 1996
$
16
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
JC>NES 331850
STATUS:
SR 18 EB MP14.85-16.l;EB MP ADDITION OF A PASSING LANE. PROJECT MILEAGE: 4.51 MANAGER: GORDON BROWN{M} REQ GRAY DO PUB UTIL 12-2-9l;JONES
17.14-18.7
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 30
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW 1996
$
24
CONST 1997
$ 1233
FED SHARE $
986
GA. SHARE $
247
0TH SHARE $
~
~
~
ll'!!!l.'!Z!ll
~- ~
l'f---~.>,
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
LAMAR 321370
STATUS:
SR18 SB 14.7-15.2;MONROE:EB ADDITION OF A PASSING LANE. PROJECT MILEAGE : 4.20 MANAGER: GORDON BROWN(M) UPDATED LGPA SHOULD BE SENT
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 31
FISCAL YEAR
COST ESTS
PE 1992 ROW 1996 CONST
UNDERWAY
$
280
AFTER 97
LAMAR
331820
STATUS:
SR 36: NB MP-10.15-11.75; SB ADDITION OF A PASSING LANE. PROJECT MILEAGE: 4.75 MANAGER: GORDON BROWN(M) REQ LAMAR COUNTY DO
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
44
AFTER 97
LAMAR
3B1516
STATUS:
COUNTY OPERATED TRANSIT PRO.Jr:CTS FUNDS RECIPIENT: LAMAR rrinM~V MANAGER: STEVE KISH
NOT APPLICABLE
LAMAR 3B1517
STATUS:
COUNTY OPERATED PUBLIC TRANSIT TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: LAMAR COUNTY MANAGER: STEVE KISH NOT APPLICABLE
CONG DIST. 3
OPERATING 1995 $
42
FUND SOURCE: RURAL TRANSIT
FED SHARE$
25
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
17
DIST. 3
OPERATING 1996 $
45
SOURCE: RURAL TRANSIT
FED SHARE$
27
.~~~it,i,,. TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
18
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MACON 32198X
STATUS:
SR 26 PASSING LANES@ 4 LOC/SCHLEY & MAqpN co SEE SCHLEY ADDITION OF A PASSING LANE. PROJECT MILEAGE: .00 MANAGER: GORDON BROWN
CONG DIST. 2 GRIP PROJECT FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 321987 IS AN ASSOCIATED PROJECT.
MACON 322280
SR 90@ SCL RR/SAND CRK IN IDEAI,.fii:i2)RR S/JCT.\$~ 195 RPREPOLJAECCETMEMNILTEAOGFETH: E . E00XISTING B.R...J..i.:..f.i..;.;.t..s.{. s) . NO ADDED LANE.S.
STATUS: =~~E~~NG~~~~9~Rg~LIT1:ti)iBti:sGN 5-13-91 FOR u~~;fTIEs
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MACON 322290
STATUS:
SR 49/128 @ MILLS c~fjjif ~F JCT W/SR 49 & 26 REPLACEMENT OF THE EXISTh~~ BRIDGES (S) . NO ADDEI) ijffi\@:
PROJECT MILEAGE : .70 MANAGER: GORDON BROWN
MACON COUNTY SIGNED FOR
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MACON 370950
STATUS:
ANDERSONVILLE NATL PRISONER OF CONSTRUCTION OF NEW ROUTE WITH PROJECT MILEAGE : 1.10 MANAGER: J. TOLSON REQ SUMTER DO UTIL 9-23-93; MACON SGN
DIST. 2
SOURCE: TRANS. ENHANCE. HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 32
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1994 UNDERWAY
CONST 1995
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1992 UNDERWAY
ROW 1995
$
195
CONST 1996
$ 2422
FED SHARE $ 1938
GA. SHARE $
484
0TH SHARE $
PE 1992 UNDERWAY
ROW l,995
$
15
CONST 1995
$
251
FED SHARE $
201
GA. SHARE $
50
0TH SHARE $
PE LOCL
ROW NONE $ CONST 1995 $
FE~ SHARE $ GA. SHARE $ 0TH SHARE $
0 2390 1912
478
-.mm
~
l'!!!m:!:!:I
~
~
~
~
~
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MARION 321982
STATUS:
SR 26 WB MP 14.2-12.7;EB ll.2-12.6;WB ADDITION OF A PASSING LANE. PROJECT MILEAGE : .60 MANAGER: GORDON BROWN MARION COUNTY SIGNED 8/6/90
CONG DIST. 2 GRIP PROJECT FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MARION 331610
STATUS:
SR 355@ PINE KNOT CREEK N OF REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .90 MANAGER: GORDON BROWN MARION COUNTY SGN FOR
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MARION 342895
STATUS:
CR 128/DOYLE ROAD@ REPLACEMENT OF THE PROJECT MILEAGE : .21 MANAGER: GORDON BROWN MARION COUNTY SIGNED ROW,
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 33
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1993 UNDERWAY
CONST 1995 $ 1933
FED SHARE $ 1546
GA. SHARE $
387
0TH SHARE $
PE 1993 UNDERWAY
ROW 1995
$
28
CONST 1996
$
811
FED SHARE $
649
. GA. SHARE $
162
0TH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1997
$
363
FED SHARE $
290
GA. SHARE $
73
0TH SHARE $
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MERIWETH REPLACE SCL RR BR OVER SR 41 W OF WARM '::f!'RINGS/INCL DETOUR
321880 BRIDGES/ RECST, OR REHAB.
PROJECT MILEAGE : .25
MANAGER: J. GRAYBEAL (M)
STATUS: MERIWETHER COUNTY SIGNED 12/14/88
ONLY.
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
lks. MERIWETH SR 100 @ OLLIE BRANCH S OF SR 54:),)::)}:\/
331630 REPLACEMENT OF THE EXISTING BRIP.'.c'Jffi}f{s) . NO ADDED
PROJECT MILEAGE : 38
---------------
MANAGER: GORDON BROWN STATUS: MERIWETHER SIGNED 3-9-92 t8W:WflrTIES.
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MERIWETH CHATTAHOOCHEE-FLINT iikliH.l!:i~E HIGHWAY HISTORIC; 37124X UNKNOWN/ UNKNOWN
MPRAONJAEGCETR: MILEAGE : . 00 - E:l.t::::::t..s.T. LANES: 0 /PROPO$ltP::::.:-}:- iJW. Jfa: 0
STATUS:
CONG DIST. 3 & 2
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
MERIWETH RED OAK CREEK COVERED BR/HUGH 371310 BRIDGES/ ENHANCEMENT
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS: DOT WILL PROVIDE THE 20% MATCH
DIST. 2
SOURCE: TRANS. ENHANCE. ADMIN FUNDS
22-Feb-1994 Page 34
FISCAL YEAR
COST ESTS
PE 1992 ROW 1997 CONST
UNDERWAY
$
421
AFTER 97
PE 1993 UNDERWAY
ROW 1995
$
10
CONST 1996
$
335
FED SHARE $
268
GA. SHARE $
67
0TH SHARE $
PE 1995 $
0
ROW 1995
$
0
CONST 1995
$
0
FED SHARE$
GA. SHARE$
0TH SHARE $ - -
PE NONE $
0
ROW NONE $
0
CONST 1995 $
82
FED SHARE$
66
GA. SHARE$
16
OTH-SHARE $
llmlm:t
~
~
~
~
~
~
~
.... ~
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MONROE 31159X
STATUS:
I-465 FM I-75 TO SR 19/US 41/BIBB UNKNOWN/ UNKNOWN PROJECT.MILEAGE : .00 - EXIST. LANES: MANAGER:
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
MONROE 311615
STATUS:
I-75 UPGRADE REST AREA t 22
REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: J. GARLAND NOT APPLICABLE
CONG DIST. 3
0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
MONROE 311640
STATUS:
I-475 RAMPS AT SR 1 RAMP/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: K FULBRIGHT (M) REQ MONROE COUNTY DO
CONG DIST. 3
4 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 35
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW NONE
$
. 0
CONST 1995 $
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1994 UNDERWAY
ROW NONE
$
0
CONST 1996 $ 1820
FED SHARE $ 1638
GA. SHARE $ 182
0TH SHARE $
PE 1994 ROW 1996 CONST
UNDERWAY
$
10
AFTER 97
MONROE 311740
STATUS:
SR 408/I-475 NBL@ I-75; ADD
BRIDGES/ RECST. OR REHAB.~ PROJECT MILEAGE : .25 MANAGER: K FULBRIGHT (M) REQ MONROE DO UTilities 10-7-93
DIST. 3
D SOURCE: I-STATE MAINT.
. DE
GHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1995 $
20
CONST 1996
$
430
FED SHARE $
387
GA. SHARE $
43
0TH SHARE $
MONROE 32137X
STATUS:
SR 18 BTWN BARNESVILLE & FORSYTH/PASSING ADDITION OF A PASSING LANE. PROJECT MILEAGE : .00 MANAGER: UNKNOWN
FUND:4\9~bf: SUF.f/l,C::E T~~j~iH<
FED11:AAL}1tIGHWAY AbMIN{~UNDS
3213if6?is AN ASSOCIAfEOiJtWJECT .t=
PE 1992 ROW 1996 CONST
.
UNDERWAY
$
0
AFTER 97
MONROE 33218X
SR 7/US 341 FROM-.25 MIN. ACADEMY DR TO .SR 74 ... LAMAR
RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE Efdlbb~G DIST. 3:
PROJECT MILEAGE : 12.57 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK
f=;tb souRct:Ili~&tAcE TRANSPcikiW
R~: ~~~! :
~ 9
toNs~E~ ~~ARE
0 0 0
STATUS:
FEDE.~ fi}l#AY ADMIN
GA. SHARE $
0TH SHARE$
MONROE 370810
STATUS:
CR 193@ RUM CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .30 MANAGER: GORDON BROWN MONROE COUNTY SIGNED 9-17-91 FOR ROW, UTILITIES & DETOURS.
CONG DIST :-"\3 FUND SOURCE: BRID6t/ti6~RAM
FEDERAL HIGHWAY JM)~iN FUNDS
PE 1991. UNDERWAY
ROW LOCL
CONST 1995
$
404
FED SHARE$
323
GA. SHARE$
81
0TH SHARE$
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MONROE 370811
STATUS:
CR 163/WESTBROOKS RD OVER TOWALIGA REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .50 MANAGER: GORDON BROWN MONROE SGN DO ROW, UTIL
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MONROE 370812.
STATUS:
CR 152/ENGLISH ROAD OVER REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .50
MANAGER: GORDON BROWN MONROE COUNTY SGN
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS.
22-Feb-1994 Page 36
FISCAL YEAR
COST ESTS
PE ~993 UND~RWAY
ROW LOCL
CONST 1995 $ 374
FED SHARE$ 299
GA. SHARE$
75
0TH SHARE$
PE 1993. UNDERWAY
ROW LOCL
CONST 1995 $ 200
FED SHARE$ 160
GA. SHARE$
40
0TH SHARE$
- . :.. ,
~
~
~
~
h~.a...ts;.Y
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
MUSCOGEE I-185 BR WON & CORRECT "S" 311155 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: GENE POWELL (M) STATUS: LGPA NOT APPLICABLE
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COLUMBUS TIP f 91-ST-2001
CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 37
FISCAL YEAR
COST ESTS
PE 1993 ROW 1997 CONST
UNDERWAY
$
200
AFTER 97
MUSCOGEE I-185/COLUMBUS FM ST MARY'S 311440 RECONSTRUCTION & WIDENING
PROJECT MILEAGE : 1.17 MANAGER: GENE POWELL STATUS: COLUMBUS/MUSCOGEE
COLUMBUS TIP f 91-ST-2001
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 31Y440 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1995 $ 1898
FED SHARE $ 1518
.GA. SHARE $
380
0TH SHARE $
MUSCOGEE I-185/COLUMBUS 311445 RECONSTRUCTION &
PROJECT MILEAGE : 2.83 MANAGER: GENE POWELL (M) STATUS: SEND LGPA IN 1995
COLUMBUS TIP f 91-ST-2001
CONG DIST. 2
FOND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW NONE $
0
CONST 1997 $ 7656
FED SHARE $ 6125
GA. SHARE $ 1531
0TH SHARE $
MUSCOGEE I-185 FM BUENA VISTA RD/COLUMBUS 311450 RECONSTRUCTION & WIDENING FROM 2
PROJECT MILEAGE: 1.33 MANAGER: GENE POWELL STATUS: COLUMBUS/MUSCOGEE SIGNED FOR UTILITIES
f 91-ST-2001
& 3
-:::::/'~ONO SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
'3'11450':ti,;. AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1995 $ 2692
FED SHARE $ 2154
GA. SHARE $
538
0TH SHARE $
MUSCOGEE SR 22 AND 411 (I-185) .. ;SLOPE IMPROVEMENTS
311570 MISCELLANEOUS IMPROVEMENTS/ OTHER
i]J)' PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES.{))
~J~tvr MANAGER: J. GRAYBEAL
=::9-QNG 0Ii;f/j
FUNo.AiBffiWt = I-s';'.~'.,rE
STATUS: NOT APPLICABLE
FEDJ1iiijfr))fIGHWAY ADMIN-{FUNDS
PE 1994 UNDERWAY
ROW 1994
UNDERWAY
CONST 1995
$ 1300
FED SHARE $ 1170
GA. SHARE $
130
0TH SHARE $
MUSCOGEE I-185 INTERCHANGE AT SR 1 311630 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : . 00 EXIST. LANES:, 2 /PROPOSED LANES: 4
MANAGER: M. REYNOLDS STATUS: SEND LGPAIN 1995
.FtJND SOURCE@ :#'STATE MAINT.
FEI:iE~ ,,,1tl9ijijJi.y ADMIN
PE 1994 ROW 1996 \CONST
UNDERWAY $ 1500 AFTER 97
MUSCOGEE CALL BOXES ON I-185 FM SR 22/MUSCOGEE TO I-BS/TROUP 311720 MISCE~LANEOUS IMPROVEMENTS/ SAFETY
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT.RIDDLE
STATUS: NOT APPLICABLE
FUND SOURCE: I-STAH:iia:INT.
FEDERAL HIGHWAY 1$:Ml)f FUNDS
PE
$
14
ROW NONE
$
0
CONST 1997
$
450
FED SHARE$
405
GA. SHARE$
45
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 38
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-NO-.----------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M--EN-T-S---------------------------Y-E-A-R---------E-S-T-S--
MUSCOGEE I-185.0VER OLD CUSSETA ROAD/CR 62
PE NONE
$
0
311770 BRIDGES / RE CST . OR REHAB.
CONG DIST. 2
ROW NONE
$
0
PROJECT MILEAGE: .00
CONST 1997
$
234
MANAGER: GENE POWELL (M)
FUND SOURCE: I-STATE MAINT.
FED SHARE $
211
STATUS: SEND IN 1995
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
23
0TH SHARE $
MUSCOGEE I-185/COLUMBUS FM ST MARY'S 31Y440 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS:
PE NONE
$
0
CONG DIST. 2
ROW NONE
$
0
CONST 1995
$
200
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $
180
GA. SHARE $
20
311440 IS AN ASSOCIATED PROJECT.
0TH SHARE $
MUSCOGEE I-185 FM BUENA VISTA 31Y450 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : MANAGER: UNKNOWN STATUS:
MUSCOGEE SECOND AVE/COLUMBUS@ C OF 321670 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: BILL MOSKAL STATUS: COUNTY SIGNED 5-28-91 FOR ROW AND
MUSCOGEE SR 1/US 27/4TH AVE/COLUMBUS OVER C OF GA RR 321810 BRIDGES/ RECST. OR REHAB.
PROJECT MILE~GE : .25 MANAGER: D. CHURCH (M) STATUS: MUSC~GEE COUNTY SIGNED 6/13/90 FOR UTILITIES.
MUSCOGEE SR1/US27/4TWAVE IN COL. OVER CG RR- EARLY R/W $ 32Y810 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: D. CHURGH STATUS:
CONG DIST. 2 & 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 311450 IS AN_ ASSOCIATED PROJECT.
PE NONE
$
0
ROW NONE $
0
CONST 1995
$
300
FED SHARE $ 270
GA. SHARE $
30
r OTH_ SHARE $
ft 86-UD-3001
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE '1993
UNDERWAY
ROW LOCL
CONST 1995
$ 4702
FED SHARE $ 3762
GA. sHARE $
940
0TH SHARE $
. COL~::\,t f 86-UD-3001
:) ~i~i ~~g,8~
.,.,.,., ,
PE 1992
ROW 1996 CONST _1997
UNDERWAY'
$ 2262 $_ 4958
FUND SOURCE: .NAT'L HIGHfii& f<
FED SHARE $ . 3966
FEDifud.:iii:i:GHWAY MMIN FUN6if
~?t6Jo.: is AN ASSOCIATEb/PkOJECT. :}/
GA. SHARE $
992
0TH SHARE $
' ::: ::gg~~us TIP f..JJ4B6E308L...
PE NONE
$
0
'"~iiJ~IZ!~:~~i~:~;~~t,if i ':}foNG DIST. 2
ROW 1996
$
786
;coN];!'iEE 0
MUSCOGEE SR.85/US 27A AT MILLER RD, FLAT ROCK RD & COUNTY LINE ROAD 332160 ACCELERATION/DECELERATION LN / SAFETY
PROJECT MILEAGE : 5.53 - EXIST. LANES: 4 /PROPOSED LANES: 0 MANAGER:.GORDON BROWN(M)
STATUS: SEND LGPA IN 199
COLUMBus"'iIP f 33216o(i
CONG DIST .3
.
FUND SOURCE: NAT 1 tiil1~f~AY
FEDERAL HIGHWAY JWijilf FUNDS
PE 1995 ROW 1997 CONST
$ .
46
$
150
AFTER 97
,.
l!l!l!'l!!!ll'! ~ ~
~; . - .;.;, ~
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MUSCOGEE SR 22 SPUR@ AVALON RD/COLUMBUS .. LEFT TURN LANES & SIGNAL
342490 TURN LANES / SAFETY
\\,.
PROJECT MILEAGE : .00 - EXIST. LANES: 0 lfRC>POSED LANES: 0
MANAGER: GORDON BROWN
... .
STATUS: SGN 3/29/89 FOR ROW, UTIL & 25%
COLUMBUS TIP f 93-SR-2001
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 39
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW LOCL
CONST 1995
$
178
FED SHARE $
160
GA. SHARE $
8
0TH SHARE $
10
MUSCOGEE sR 22 SPUR/COLUMBUS@ scHATULGAMi&tff:icL sIGNALslti
342630 INTERSECTION IMPROVEMENT / SA.f~'l'yj}( /
'
PROJECT MILEAGE : ; 00 - EXISTd~ts: 0 /PROPOSED ~ks: 0
STATUS:
MANAGER: GORDON BROWN
....=,:::: ,(:/:::/
MUSCOGEE/COLUMBUS SGN 11-,i:fafaj BtrLITIES
(DOT BUY R#'l/93)
COLUMBUS TIP# 93-SR-2004 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW 1993 UNDERWAY
CON.ST 1995
$
199
FED SHARE $
159
GA. SHARE $
30
0TH SHARE $
10
MUSCOGEE 13TH STREET BRIDGE oli:MJrTTAHOOCHEE RIVER
3502 60 . PRELIMINARY ENGINEERING::/\~EW CONSTRUCTION
}{::{:(
PROJECT MILEAGE : .60 MANAGER: BEN BUCHAN (M)
EX=I::S:;:;:T;::: .
LANES:
0
/PROPOSE:=:O::=iLA....N...ES:
4
STATUS: HOLD FOR CONST FUNDING; LOcAt
COLUMBUS TIP f 78-BR-1001
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1976 UNDERWAY
ROW LOCL
CONST 1997
$ 8300
FED SHARE $ 6640
GA. SHARE $ 2490
0TH SHARE $ 4150
MUSCOGEE BUENA VISTA RD-PH II FM ANDREA 350685 RECONSTRUCTION & WIDENING FROM
PROJECT MILEAGE : 1.35 MANAGER: BEN BUCHAN (CM) STATUS: SIGNED 4/27/88 FOR ROW AND UTILITIES
MUSCOGEE SR 22 SPUR/MACON RD FM RIGDON RD TO CODY 350690 INTERSECTION IMPROVEMENT/ RECST. OR REHAB.
PROJECT MILEAGE : .65 - EXIST. LANES: 4 /PROPOSED MANAGER: B FERGUSON STATUS: SIGNED 1/18/89 FOR UTILITIES AND 50% ROW COST.
f 86-SR-2005
& 2
FUND SOURCE: SURFACE TRANSPORT.
FE:.D::;.E--R-A-L. HIGHWAY ADMIN FUNDS
J1t, C~LUMBUS
# 86-SR-1001
)C()NG DISil\3 & 2
:sdw&f '. FUND
suRFAcE TRiillitgff'.
FEDEiAi,=ittGHWAY JiliM1NJtuNBs
PE 1994
UNDERWAY
ROW LOCL
CONST 1996
$ 3543
FED SHARE $ 2834
GA. SHARE $
709
0TH SHARE $
PE 1992 UNDERWAY
ROW 1995
$ 1500
CONST 1997
$ 1507
FED SHARE $ 1206
GA. SHARE $
301
0TH SHARE $
MUSCOGEE BUENA VISTA RD/COLUMBUS FM WYNNTON RD SE TO ILLGES RD 350796 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 1.66 MANAGER: BILL MOSKAL (M) STATUS: COLUMBUS/MUSCOGEE SIGNED FOR ROW & UTILITIES 11-20-91.
MUSCOGEE 19TH ST FM 2ND AVE/SR 85 TO TALBOTTON AVE (OLD&NEW LOC] 350800 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .30 MANAGER: BILL MOSKAL (C) STATUS: CO SGN 2-4-92 ROW UTIL & PE; BIBB CITY SGN 12-6-91 ROW & UTL
J,ji~#iC2oib,>.
.&=:::='3 :=,:;:
...
1
FUND SOURct'.f::~&~~CE TRANSPJmgs FEOERAL<itl:GH?tAY ADMIN FUNDS.
PE 1992 UNDERWAY
ROW LOCL
:;c::=:/tONST 1997
$ 3800
FED SHARE$ 3040
GA. SHARE$
760
0TH SHARE$
COLUMB::;!I\\t!P t 86-IN-468d J
CONG DIST. 2
FUND souRcE: suRFAEl[4~sPORT.
FEDERAL HIGHWAY @MJN FUNDS
PE NONE
$
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0
2480 1984
496
COUNTY P. I.NO.
. DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MUSCOGEE SR 22 SP/MACON RD FM WOODRUFF-FARM 350870 RECONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE : 3.43 MANAGER: D. CHURCH (M) STATUS: SEND LGPA IN 1996
80
COLUMBUS TIP t 93-BR-1002
CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 40
FISCAL --YEAR
COST ESTS
PE 1992 ROW 1996 CONST
.UNDERWAY $ 3000 AFTER 97
MUSCOGEE SR 22 SP/MACON RD@ BULL
350875 REHAB. OF THE-EXISTING o~.iuu~
D: PROJECT MILEAGE : .00
MANAGER:
CHURCH (M)
STATUS: SEND LGPA IN 1995
MUSCOGEE SR 22 SP FM REESE 350880 RECONSTRUCTION & WI:DEl~it~G/:fR.OM
PROJECT MILEAGE : MANAGER: D. CHURCH STATUS: SEND LGPA IN 1996
COLUMBUS TIP t 93-BR-1001
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP t 92-SR-2001
CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL- HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1997
$
490
FED SHARE $
392.
GA. SHARE $
98
0TH SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY $ 2000 AFTER 97
MUSCOGEE CUSSETA/OLD CUSSETA- RD/CR 62 FM FT BENNING DR TO STA6Jf8U 350890 RECONSTRUCTION-& WIDENING FROM 2 LANES .TO 5 LANES . )':
PROJECT MILEAGE : 1.72 MANAGER: BILL MOSKAL STATUS: SEND LGPA WHEN PROJECT IS ADDED TO .CWP
MUSCOGEE SOUTH RIVERWALK BICYCLE/PEDESTRIAN FACILITY IN dbLUMBUS
371010 BICYCLE/PED.- FACILITY / ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED
MANAGER: MEG BRYSON
.
STATUS: TO BE DONE BY CONTRACT
MUSCOGEE EQUIP. REBUILD, FURNITURE, TIRE LEASE 3D3014 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
MUSCOGEE EQUIP. REBUILD, TIRE LEASE, FUEL BAY CONSTRUCTION 3D3015 TRANSIT PROJECTS/ CAPITAL.
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
t 86-SR-2009
:<:::::;:>:
FUND SOURCE: SURFACE TRANSPORT. FEDERAL-HIGHWAY ADMIN FUNDS
COLUMBUS i i l t 94-0T-2001
::::<::Q~t? DIST{:2' & 3
FU~;: 121t=i== TRANS. ENHJlliEia>
FEDtm:rnr ,:,;. GHWAY iiliMIN itiNDif
PE 1995 ROW LOCL CONST
$ 109 AFTER 97
PE LOCL
ROW LOCL
CONST 1996 $ FED SHARE $ GA. SHARE $ 0TH SHARE $
3255 2604.
651'
3_ :t.)fa)(?
FUND SOURciilal~
FEDERAL<!.tRANSiT
1995
$ 201
FED SHARE$
161
GA. SHARE$
20
0TH SHARE$
20
CONG DIST. =':;3 & 2 FUND SOURCE: URB~:@m;IT
FEDERAL TRANSIT .aj:>ijIN FUNDS
CAPITAI. 1996
$
196
FED SHARE$
157
GA. SHARE$
20
0TH SHARE$
20
,,
,.
IZIJ'3m
~
l!!!fflffl!I
~
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MUSCOGEE PUBLIC TRANSIT SERVICE FOR COLUMBUS AND'MUSCOGEE COUNTY 3D3017 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: COLUMBUS PUBLIC MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
MUSCOGEE PUBLIC TRANSIT SERVICE FOR coLm&;ti'.f:\i'JH'.MUscoGEE .86bNTY 3D3018 TRANSIT PROJECTS / OPERATIONS , /:{(/}
FUNDS RECIPIENT: COLUMBUS PUBiic:'ffilllisIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 41
FISCAL YEAR
COST ESTS
OPERATING 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
2434 730 3
1707
OPERATING 1996 $ FED SHARE $
GA. SHARE $ 0TH SHARE $
2531 734 7
1804
MUSCOGEE ELDERLY AND DISABLE~\iif&f~s AND EQUIPMENT 3V1017 TRANSIT PROJECTS / CAPitAI';,.
FUNDS RECIPIENT: AGENCIES'(fN COLUMBUS MANAGER: STEVE KISH STATUS:
CONG DIST. 3 & 2
CAPITAL 1995
$
41
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
33
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
MUSCOGEE ELDERLY AND DISABLED VEHICLES AND 3V1018 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN COLUMBUS MPO AREA MANAGER: STEVE KISH
STATUS:
DIST. 3 & 2
CAPITAL 1996
$
42
SOURCE: ELDERLY & DISABLED FUND FED SHARE$
34
~~q~~~- TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
. PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
PEACH 311540
STATUS:
I-75@ SR 96 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. LANES: 2 MANAGER: J. GARLAND (M) SEND LGPA IN 1995
CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 42
FISCAL YEAR
COST ESTS
PE 1993 ROW 1996 CONST.
UNDERWAY
$
912
AFTER 97
PEACH 311780
STATUS:
I-75: CR 182/WHITE ROAD OVER BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: B FERGUSON REQ PEACH DO UTIL
CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW 1995
$
1
CONST 1996
$
139
FED SHARE $
125
GA. SHARE $
14
0TH SHARE $
PEACH 322380
STATUS:
SR 49@ BIG INDIAN REPLACEMENT OF THE PROJECT MILEAGE : .35 MANAGER: GORDON BROWN PEACH COUNTY SIGNED 9-14-92
CONG DIST. 3 & 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS-
Gii:MF PEACH
SR 42 FM NEAR OLD FT VALLEY RD EAST To sR 4 9 sw oF
sif -----.-., -
331940 _ CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
,..,,.}{doNG DIST. 3
PROJECT MILEAGE : .47
.:::::/?:/
MANAGER: GORDON BROWN
::-FUND SOURCE: SURFACE TRANSPORT.
STATUS: COUNTY SGN 1-14-92 PUB
lfE.P~. HIGHWAY ADMIN FUNDS
PEACH 371250.
STATUS:
FORT VALLEY DEPOT, ' LANDSCAPING & PEDESTRIAN _WAYS\.
MISCELLANEOUS--IMPROVEMENTS / ENHANCEMENT
PROJECT MILEAGE: .00 MANAGER: H. SUTHERLAND
EXIST.
LANES:
0
/PROPOSED
LANESj
@]/?'"
LGPA TO BE DONE BY CONTRACT
/:qQNG DI$!)!~'
FUND ibtffidt: TRANS.. ENHiilltt/> FEoifiliidb:GHWAY ru5Mrn(i6ifos
PE 1992
UNDERWAY
ROW 1994
$
5
CONST 1995
$
730
.FED SHARE $
584
GA. SHARE $
146
OTB.SHARE $
PE 1993 UNDERWAY
ROW 1995
$
300
CONST 1996 $ 292
FED SHARE $
234
GA. SHARE $
58
OTB SHARE $
PE 1996 $ ROW 1996 $ CONST 1996 $
FED SHARE$.:
GA. SHARE$ OTH.SHARE $
20 86 175 140 21-56
PEACH 3B1234
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PEACH MANAGER: STEVE KISH
::;} ROBINS TIP i } i
;~f; ;~ARE : 'ONG DIST. 2 ,,&}3\ SOURci]:iibfu TRANSIT
: 9 rE~TIN;E~9
51_ 30
FEDElUU, ,j~~fT _ADMIN FUNDS_({
GA. SHARE $
0TH SHARE $ -
21 .
PEACH 3B1235
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE_
TRANSIT FACILITIES/ OPERATIONS
,
FUNDS RECIPIENT: PEACH
MANAGER: STEVE KISH
W. ROBINS\.TIP t
_ CONG DIST. \2 & 3
OPERATING 1996
$
54
ADMI~ FUND SOURCE: RuRA.t:iilisIT
FEDERAI,, TRANSIT
FUNDS
FED SHARE$
32
GA. SHARE$
0TH SH~$
22
mmm
m!l!:ffll
l!!'J!!l!l'l'll
!!!!!l!!!l'l!I
ll!!!'!!!!'!!!!
m!!!!!!I
~
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
PEACH 3C2234
STATUS:
ONE CONV. VAN/LIFT, ONE STANDARD TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PEACH MANAGER: STEVE KISH LGPA NOT APPLICABLE
W. ROBINS TIP t
CONG DIST. 2 & 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 43
FISCAL YEAR
COST ESTS
CAPITAL 1995
$
54
FED SHARE$
43
GA. SHARE$
6
0TH SHARE$
5
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
PIKE 322100
STATUS:
REALIGN SR 362/WILLIAMSON@ PINE;HARV.ARP;2ND DIST;WILLIAMSON
INTERSECTION IMPROVEMENT / SAFETY
. . : ....
PROJECT MILEAGE : .11 - EXIST. LANES: 2 /fRQPOSED LANES: 2
MANAGER: GORDON BROWN
. ,:;:;:)\:
REQ PIKE COUNTY & WILLIAMSON DO UTILIT!i!:s,':?f~J.-93
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
~~~20
STATUS:
~Pi!g,:~:~R;: ~~~i~~;T~~~~Rtbi.tJ~lf~t!oc:~!D rJlli$~-
PROJECT MILEAGE : .00
MPIAKNEAGCEORU: NTGYORDSIOGNNEBDROW1N-6-94::.-:f-:-:-:-:-~:-:: Jt6W, UTILITIES &
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PIKE 370761
STATUS:
CR 51@ NW CTY LIMITs)fiidi.oN@ ELKINS.CREEK
REPLACEMENT OF THE EXIST:X~G BRIDGES(S). NO ADDEO
PROJECT MILEAGE : .00
~~G~~~N~~~~:-!!0~tiow
t
&rtLITIEs
&
,. -.
FPii(qlfiiY!huioN,,, .
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 44
FISCAL YEAR
COST ESTS
PE NONE ROW 1995 CONST
$
0
$
165
AFTER 97
PE 1995
$
6
ROW LOCL
CONST 1997
$
382
FED SHARE $
306
GA. SHARE $
76
0TH SHARE $
PE 1995
$
5
ROW LOCL
CONST 1996
$
325
FED SHARE $ 260
GA. SHARE $
65
0TH SHARE $
11!1!1!!!!!!! ~ l!!!!!!'!!!!J
l!l!!'!!!!!!'l ~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
PULASKI 331620
STATUS:
SR 230@ SOUTH PRONG BIG TUCSAWHATCHEE REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .38 MANAGER: GORDON BROWN PULASKI REFUSED 10-5-92.
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 45
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1995
$
15
CONST 1996
$
500
FED SHARE $
400
GA. SHARE $
100
0TH SHARE $
PULASKI 332030
STATUS:
SR 11/US 341 OVER TOWN REHAB. OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: B FERGUSON SEE #322170
PE NONE $
0
CONG DIST. 8
ROW 1994 $
0
GRIP PROJECT
CONST 1996 $ 246
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
197
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
49
322170 IS AN ASSOCIATED PROJECT.
0TH SHARE$
PULASKI 3Bl239
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: PULASKI MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1995 $
22
FUND SOURCE: RURAL TRANSIT
FED SHARE$
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
9
PULASKI 3Bl240
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PULASKI MANAGER: STEVE KISH
DIST. 8
OPERATING 1996 $
24
SOURCE: RURAL TRANSIT
FED SHARE$
14
TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
10
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
SCHLEY 321987
STATUS:
SR 26 PASSING LANES @4 LOCATION
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 5.43 MANAGER: GORDON BROWN DOT PAY SCHLEY & MACON COUNTIES
CONG DIST. 2 GRIP PROJECT FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 46
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1994
UNDERWAY
CONST 1995
$ 2222
FED SHARE $ 1778
GA. SHARE $
444
0TH SHARE $
B!Je
l'J!!!!!ffl!I
~
11'!!!!!!'!!1
l!l!!!!!!!'JI
~
~
;,;.,. -~+l
f.
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
SPALDING TAYLOR ST/GRIFFIN FM 16TH ST TO 10TH ST\
32164 0 RECONSTRUCTION & WIDENING FROM 4 LANES Tl:).:;: 5 LANES.
PROJECT MILEAGE : .70
MANAGER: J. GRAYBEAL
STATUS: D.O.T. TO PAY UTILITY COSTS FOR
~ 2-3-89
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS 342480 IS AN ASSOCIATED PROJECT.
STATUS:
RECONSTRUCTION & WIDENING FROM PROJECT MILEAGE : 2.00
MANAGER: J. GRAYBEAL (CJ .... . .... GRIFFIN SGN FOR UTIL 4-124:~3':'{$.P}\I.DI_NG REFUSED 2-22/!fa
CONG DIST. 3
FUND .SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 47
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$ 1203
FED SHARE $
962
GA. SHARE $
241
0TH SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY
$ 3428 AFTER 97
SPALDING sR 155 NB MP 11.0/sPAhBJh~o.25/HENRY;sB MP 1.6-3/iYfilM~Y
331520 ADDITION OF A PASSING LJ\NE.
PROJECT MILEAGE : 2. 90 .....
MANAGER: GORDON BROWN(M) . .
.. .. ,. ..
STATUS: HENRY SGN 5-15-89 FOR UTILITfil:'$).$.PALDING.<:!:!;tti'J.$.itti.\2::..n::::~l-
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY
$
15
AFTER 97
SPALDING SR 92 OVER UNNAMED CREEK@ MP 5.1 NEAR EDWARDS RD 332050 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED
PROJECT MILEAGE : .00 MANAGER: GORDON BROWN(M) STATUS: SEND LGPA IN 1995
SPALDING 342480
STATUS:
SPALDING SR 3/US 19/GRIFFIN FM SR 92 N/CS 804 N TON/CR 18
342621 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.52
MANAGER: J. GRAYBEAL (M)
STATUS: SGN 9/25/90 FOR ROW & UTILITIES
T&S PROJECT
SPALDING SR 85 CONN FM SR 16 (SPALDING)N TO CR 168 IN BROOKS/FAYETTE 34280X RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS:
: coNG DIST. 3
FUND SOURCE: BRIDGE PROGRAM
FEDERAL ::-:-:
HIGHWAY
ADMIN
FUNDS
PE 1994
UNDERWAY
ROW 1996
$
1
CONST 1997
$
352
FED SHARE $
282
GA. SHARE $
70
0TH SHARE $
PE 1992
UNDERWAY
ROW 1995
$
878
CONST 1996
$
723
FED SHARE $
651
GA. SHARE $
72
0TH SHARE $
{bNG DIST. 3.,: :;:;::::i=:::==::
=Qfg:p PROJE9,'.t:/:i/
FUND SOUR,9~:\)iiY'i'Y . SAFETY
.. ,
FEDEMI,.,:1{:i:eiii~A.Y ADMIN FUNDS,:=
PE 1993
UNDERWAY
ROW 1995
$
200
,::::::::"CONST 1997
$
893
FED SHARE $
804
GA. SHARE $
89
0TH SHARE $
CONG DIST.::::3
FUND SOURCE: suRFAt~[fkANsPORT.
FEDERAL HIGHWAY JIDMi~ FUNDS
342800 IS AN ASSOCIATED PROJECT.
PE 1996 ROW CONST
$
0
AFTER 97
. AFTER 97
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 48
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. -------------.-P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M--EN-T-S---------------------------)-[E-A-R--------E-S-T-S---
SPALDING RESTORE OPERA HOUSE& CREATE VISITORS
GRIFFIN
PE 1995
$
150
371230 MISCELLANEOUS-IMPROVEMENTS/
CONG DIST. 3
ROW 1995
$
100
PROJECT MILEAGE : 00 - EXIST.
CONST 1996
$
999
MANAGER: BOB MOORE
FUND SOURCE: TRANS. ENHANCE.
FED SHARE$
799
STATUS: LGPA TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
49
0TH SHARE$ 249
"
,J
I!!!!!!!!!!
l!l!C'!l!ffl l!!l!l'!mll l!!!'l'!!l ~ ~
~I~if"''-,+..!.
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 49
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
---------------------------------------------------------------------------------------------. ----------------------------------. ----
STEWART RESTORE RICHLAND DEPOT; BEDINGFIELD
PE LOCL
371260 MISCELLANEOUS IMPROVEMENTS/ ENHANCl~Ml~N'.r?,
CONG DIST. 2
ROWNONE $-
0
PROJECT MILEAGE : .00 - EXIST.
CONST 1997
$
610
MANAGER: H. SUTHERLAND
FUND SOURCE: TRANS. ENHANCE.
FED SHARE$ 488
STATUS: LGPA TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
122
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
SUMTER 321750
STATUS:
SR 3ojus 280 FM FELDER ST/CR 307 TOW RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : 1. 80
MANAGER: J. GARLAND SUMTER SGN 4/89 UTILITIES & AMERICUS
DR CONG DIST. 2 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
SUMTER 322197
STATUS:
SR 3/US 19 @MUCKALOOCHEE REHAB. OF THE EXISTING BRIDGE PROJECT MILEAGE : .00 MANAGER: M GANNAWAY (M) SUMTER COUNTY SGN 2-3-92
SUMTER 322310
STATUS:
SR 3/US 19@ BEAR ~"-'~~~-n REPLACEMENT OF THE PROJECT MILEAGE : .00 MANAGER: M GANNAWAY (M) SUMTER COUNTY SIGNED 2-3-92
SUMTER 322430
STATUS:
SR 27/US 280 EB FM MP 6.7-8.2;WB
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.94 MANAGER: GORDON BROWN(M) SUMTER SIGNED FOR UTILITIES 8-8-91.
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM J. FEDERAL HIGHWAY ADMIN FUNDS 322195 IS AN ASSOCIATED PROJECT.
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322195 IS AN ASSOCIATED PROJECT.
DIST. 2
SOURCE: NAT!L HIGHWAY HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 50
FISCAL YEAR
COST ESTS
PE 1992 -UNDERWAY
ROW 1992 UNDERWAY
CONST 1995
$ 3674
FED SHARE $ 2939
GA. SHARE $
735
0TH SHARE $
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1997
$
160
FED SHARE $
128
GA. SHARE $
32
0TH SHARE $
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1997
$
142
FED SHARE $
114
GA. SHARE $
28
0TH SHARE $
PE 19.92 ROW 1997 CONST
UNDERWAY
$
25
AFTER 97
SUMTER 322690
STATUS:
SR 27 AT SR 49-IN AMERICUS
INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES,:\J)::};::=
MANAGER: BURT RIDDLE REQ AMERICUS DO UTILITIES 1-24-94
o-t::o:;::=:::/:,:}:
,,GONG Disihfa
FUND;:J\9.~~t: NAT'. L FEDE:M:L,HIGHWAY
PE 1994
UNDERWAY
ROW 1995
$
10
CONST 1996
$
289
FED SHARE $
289
GA. SHARE $
0TH SHARE $
SUMTER 331540
STATUS:
AMERICUS NORTH BYPASS FM SR 3/US 19 TO CR 297 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE: 3.23 MANAGER: GORDON BROWN SUMTER SGN 5-17-91 FOR UTIL;AMERICUS SGN 5-28-91 CITY UTIL.
PE 1992 UNDERWAY
! ROW LOCL
t:~~~iiliff~~~~NTRANSPORT'){::: ,)CONSi:~9~=-
2067 1654
413
0TH SHARE$
SUMTER ANDERSONVILLE. NATL PRISONER/WAR MUSEUM ENTRANCE RD/SEE MACON 37095X UNKNOWN/ UNKNOWN
PROJECT.MILEAGE .00 - EXIST. LANES:, 0 /PROPOSED LANES: 0
MANAGER: STATUS:.
CONG .DIST. =::2 FUND SOURCE: TRANi~:!i 1ilui~cE.
FEDERAL HIGHWAY ADMik FUNDS
PE LOCL
ROW NONE $
0
CONST.1995
$
0
FED SHARE$
GA. SHARE$
0TH SHARE$
lll'!l'!!l!I
~
~
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
_PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
SUMTER 3Bl249
STATUS:
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISH
CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
SUMTER 3Bl250
STATUS:
CITY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: CITY MANAGER: STEVE KISH
CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
SUMTER 3C2249
STATUS:
ONE STANDARD VAN AND TRANSIT FACILITIES/ FUNDS RECIPIENT: CITY MANAGER: STEVE KISH
LGPA NOT APPLICABLE
CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 51
FISCAL YEAR
COST ESTS
OPERATING 1995 $
75
FED SHARE$
44
GA. SHARE$
0TH SHARE$
31
OPERATING 1996 $
78
FED SHARE$
46
GA. SHARE$
0TH SHARE$
32
CAPITAL 1995
$
21
FED SHARE$
17
GA. SHARE$
2
OTH,_ SHARE $
2
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
_GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TALBOT 322300
STATUS:
US 80 @ BARFIELD CREEK E/TAYLOR CO LINE\,.
REPLACEMENT OF THE EXISTING BRIDGES (S). -~Q ADDED LANES.
PROJECT MILEAGE : . 50
,., , ,-,-:-
MANAGER: GORDON BROWN TALBOT REFUSED 2-16-93; NO UTILITY cos'l6:tW6:D 5-18-93
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TALBOT 371280
STATUS:
CR l 7yGORMAN ROAD @ CSX RAILROAI>:i{{!!:8liV LMT OF TAiijTTON
RPREPOLJAECCETMMENILTEAOGFETH: E . E21XISTING B~-t,.,p.,._<..,.,;.,.,_.,,_P,_,_i._.~_ {Sj. NO ADDED !Js.
MANAGER: GORDON BROWN (M) _.,:;:,:;::,:,,,,,,:;::;;,:::,,:;:;,:,,- ._
'::'=:::=:::=:::\
TALBOT SGN ROW/UTL/DETOU~$)fi/~:S;cITY SGN 9/93 ROw,gf'.ijtpET'R
TALBOT 3Bl254
STATUS:
=\\rt
COUNTY OPERATED PUBLI6ii$~SIT SERVICE TRANSIT FACILITIES/ OPEMT.IONS FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
TALBOT 3B1255
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILiTIES / OPERATIONS FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH
DIST. 2
FUND SOURCE: RURAL TRANSIT fll:P.)!!~ TRANSIT ADMIN FUNDS
TALBOT 3C2254
STATUS:
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH LGPA NOT APPLICABLE
22-Feb-1994 Page 52
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1995
$
4
CONST 1996
$
818
FED SHARE $
654
GA. SHARE $
164
0TH SHARE $
PE 1994
UNDERWAY
ROW LOCL
CONST 1997 _ $
374
FED SHARE$
300
GA. SHARE$
75
0TH SHARE$
OPERATING 1995 $
75
FED SHARE $
42
GA. SHARE $
0TH SHARE $
33
OPERATING 1996
$
77
FED SHARE $
43
GA. SHARE $
0TH SHARE $
34
1995
$
32
FED SHARE$
26
GA. SHARE$
3
0TH SHARE$
3
"
l!!l!!!!!!ll
~
~
~
l!l!!!!!!!l
~
~
~
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TAYLOR 322010
STATUS:
SR 3@ FLINT RIVER/ALSO UPSON CO REHAB. OF THE EXISTING BRIDGE(S). FROM PROJECT MILEAGE : .20 MANAGER: B FERGUSON UPSON SGN 6/92 UTIL;TAYLOR REFUSED
TO 4 LANES.
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 363558 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 53
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1996
$ 2137
FED SHARE $ 1710
GA. SHARE $
427
.OTH SHARE $
TAYLOR 32272X
STATUS:
SR 3/US 19 FM SR 240 TO CR RECONSTRUCTION& WIDENING ~o,nM'?':~'n~~
PROJECT MILEAGE : . 00 MANAGER: UNKNOWN
PE 1994
CONG DIST. 2
ROW 1997
GRIP PROJECT
CONST
FUND SOURCE: GOVERNOR'S RD IMP PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
UNDERWAY
$
0
AFTER 97
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TROUP 311300
SR 219 FM 800' S/I-85 TO 300' N/I-85 ., .. RECONSTRUCTION & WIDENING FROM 2 LANES TQ\.4 LANES. PROJECT MILEAGE: .42
STATUS: =t:E~~uiTYG~~g 3/31/89 FOR UTILITii~ll!lsJth.
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 331530 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 54
FISCAL YEAR
COST ESTS
PE 1991-- UNDERWAY
ROW 1993 UNDERWAY
CONST 1996 $ 2244
FED SHARE $ 1795
GA. SHARE $
449
0TH SHARE $
TROUP 31171X
STATUS:
CONG DIST. 7 & 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE
$
0
ROW NONE $
0
CONST 1997 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
TROUP 31172W
STATUS:
CALL BOXES ON I-185 if4:l$i)22/MUSCOGEE TO-I-85 siti'MoicoGEE
UNKNOWN / NEW CONSTRUCTJ'.Q~
PROJECT MILEAGE: .oo - ~kfsT. LANES: 0 /PROPosi6.Imis: 0
MANAGER: BURT RIDDLE
. . ..
CONG DIST. 3 & 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE
$
0
ROW NONE $
0
CONST 1997 $
-o
FED SHARE$
GA. SHARE$
0TH SHARE$
TROU~ 321720
STATUS:
SR 1@ UNNAMED TRIBUTARY TO WEST POINT LAKE REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : .30 MANAGER: M GANNAWAY COUNTY SIGNED 11-17-87 FOR UTILITIES
::::C::::::::::::,-.,n,_,,., DI ST . 7
PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
:3:G292-6':S. AN ASSOCIATED PROJECT.
PE 1992 ROW 1995 CONST
UNDERWAY
$
17
AFTER 97
TROUP 322230
STATUS:
SR 14 N&SB FM MP 3.87-5.37; NB MP 7.07-8.41
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.84 MANAGER: GORDON BROWN(M) TROUP SIGNED 9-30-92 BUT NOTED THEY HAVE NO UTIL
PE 1992 ROW 1997
CONST
UNDERWAY
$
400
AFTER 97
TROUP .. 331530'
STATUS:
SR 219 FM S/CR 91- TO 1000' N/CR 304 [EXCEP IR..-85-.l (295)] RECONSTRUCTION &:WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .78 MANAGER: J. GARLAND COVERED UNDER I-85-1(295), SGN 3-31-89 FOR UTILITIES
TROUP 331800'
STATUS:
SR 14' SW OF HOGANVILLE@ SHOAL CRI<
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED ~ES.
PROJECT MILEAGE : .25
. -
MANAGER: GORDON BROWN
TROUP SIGNED 9-30-92 BUT NOTED THEY HAVE NO UTIL INVOLVED
PE 1992~ UNDERWAY
I{1~NG DIST. 7
ROW 1993 UNDERWAY
:-::::::,:/tNST 1995
$ 1174
FUND souRcil:i\\jdfu.AcE TRANsPciJfo:
FED SHARE $
939
j ; ~ ~ i ~ J J i l ' ! ! s ~ ~ ! : E ~ ~ ~ $ . B : f
GA. SHARE $ 235 0TH SHARE $
CONG DIST.":7
FUND SOURCE: . BRit:>qtf.~OGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY '
ROW 1995 $
15
CONST 1995
$
681
FED SHARE$
545
GA. SHARE.$
136
0TH SHARE$
.
~
~
~
~
~
~
~
COUNTY P.I.NO.
TROUP 342410
STATUS:
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
TROUP 370907
STATUS:
CR 418/MOBLEY BRIDGE RD @ YELLow(JiBID:W cruc TRIBJf)&y RPREPOLJAECCETMEMNILTEAOGFETH: E E0X0 ISTING B.R..:.t.P..l.t.f..f.i...s.{.S) NO ADDED LANES.
MANAGER: GORDON BROWN TROUP COUNTY SGN 10-6-92 ijgW,fotiTILITIES &
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TROUP 3B1259
STATUS:
COUNTY OPERATED PUB~i8:\i'.f~~IT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TROUP ..... .
MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
TROUP 3B1260
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TROUP MANAGER: STEVE KISH
TROUP 3C2259
STATUS:
TWO STANDARD VANS AND TWO MOBILE RADIOS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TROUP MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 7 FUND SOURCE: RURAL TRANSIT F~DERAL TRANSIT ADMIN FUNDS
orsll
22-Feb-1994 Page 55
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW 1993 UNDERWAY
CONST 1995 $ 252
FED SHARE $ 227
GA. SHARE $
25
0TH SHARE $
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$
485
FED SHARE$ 388
GA. SHARE$
97
0TH SHARE$
OPERATING 1995 $
72
FED SHARE$
43
GA. SHARE$
0TH SHARE$
29
OPERATING 1996 $
74
FED SHARE$
44
GA. SHARE$
0TH SHARE$
30
1995
$
42
FED SHARE$
34
GA. SHARE$
4
0TH SHARE$
4
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
TWIGGS 321990
STATUS:
SR 96 BT HOUSTON CL & I-16( ADDITION OF A PASSING LANE. PROJECT MILEAGE: 6.15 MANAGER: GORDON BROWN DOT TO PAY UTIL 11/90--DIST
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 56
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$ 2433
FED SHARE $ 1946
GA. SHARE $
487
0TH SHARE $
TWIGGS 331840
STATUS:
SR 96 NB FM MP 16.2 - 17.8; ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.06 MANAGER: GORDON BROWN TWIGGS COUNTY REFUSED
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1995
$
93
CONST 1996
$ 1328
FED SHARE $ 1062
GA. SHARE $
266
0TH SHARE $
TWIGGS 3Bl443
STATUS:
COUNTY OPERATED TRANSIT. FACILITIES/ FUNDS RECIPIENT: TWIGGS MANAGER: STEVE KISH
CONG DIST. 11 & 8
OPERATING 1995
$
21
FUND SOURCE: RURAL TRANSIT
FED SHARE $
13
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
8
TWIGGS 3Bl444
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TWIGGS MANAGER: STEVE KISH
DIST. 11 & 8
OPERATING 1996
$
22
SOURCE: RURAL TRANSIT
FED SHARE $
13
TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
9
. t
,,
r
l!llln!l!I
~
~
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 1
FISCAL YEAR
COST ESTS
ATKINSON SR 89/US 441 FROM CR 101 TO SR 4223BX UNKNOWN/ UNKNOWN
PROJECT MILEAGE ,00 - EXIST. MANAGER: STATUS:
PE 1995
$
0
CONG DIST. 8
ROW
AFTER 97
0
GRIP PROJECT
CONST
AFTER 97
FUND SOURCE: GOVERNOR'S RD IMP PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
422380 IS AN ASSOCIATED PROJECT,
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 2
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
--------------------..
,
BEN HILL SR 90@ ALAPAHA RIVER/ALSO TURNER CO
------------ --------------C-O-M--M-E-N-TS---------------------------'Y--EA--R--------E-S-T-S--
PE 1992
UNDERWAY
431040 REPLACEMENT OF THE EXISTING BRIDGES(S).
CONG DIST. 8
ROW 1995
$
1
PROJECT MILEAGE: .00
CONST 1996
$
718
MANAGER: J. LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
574
STATUS: BEN.HILL SGN. 1-7-92 & TURNER SGN
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
144
0TH SHARE $
BEN HILL SR 107/US 319 OVER STURGEON 442580 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .00 MANAGER: J. LINDSEY STATUS: SEND LGPA IN 1995
CONG DIST. 8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW 1996
$
1
CONST 1997
$
611
FED SHARE $
489
GA. SHARE $
122
0TH SHARE $
BEN HILL SR 90 OVER ALAPAHA 442590 REPLACEMENT OF THE
PROJECT MILEAGE : .00 MANAGER: J. LINDSEY STATUS: BEN HILL REFUSED TO COMMIT
PE 1995
$
5
CONG DIST. 8
ROW 1996
$
1
CONST 1997
$
170
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
136
\:
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
34
0TH SHARE $
~ t s / . BEN HILL EVERGREEN CEMETERY ROAD OVER TURKEY CREEK IN FITZGERAflgJ::
450420 REPLACEMENT OF THE EXISTING BRIDGES {S). NO ADDED
PROJECT MILEAGE : .50
MANAGER: J. LINDSEY
..
STATUS: CITY SGN 10-18-93 ROW, UTIL, DETOURS; COUNTt Jl,/:if$fi:kfo-20-93
1: :}JONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM ~.~U~M~. HIGHWAY ADMIN FUNDS
PE 1995
$
10
ROW LOCL
CONST 1996
$
180
FED SHARE $
144
GA. SHARE $
36
0TH SHARE $
()
~
~
~
g~-e..@
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BROOKS 421720
STATUS:
BROOKS 421722
STATUS:
BROOKS 442680
STATUS:
SR 133 FM W/CR 276 TOE. OF WITHLACOOCHEE RVR/LOWNDES
RECONSTRUCTION & WIDENING FROM 2 LANES T0':-.4 LANES.
PROJECT MILEAGE : 1.60
~A~:~~K~ ~gL~~i~Hil-8-90; LOWNDES SIG~ift:Jfat5/90 - UTIL.
~~J ~FL;~i~~I:;;:r~~~g!~~.r,1,~:~-:j ft..Es
~~i~~:rig~;~~~Hr:-a-~ptll[i;~ SGN 12/5/90
~:i~~~~~:~LY CR 275 @ CAT CREE~
4 MILES SOUTH OF/6~~~~:
REPLACEMENT OF -THE EXISTING BRIDGES($) NO ADDED_,:wiis.
PROJECT MILEAGE : .20
.
MANAGER: J. LINDSEY
SEND LGPA IN 1997
CONG DIST. 2 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 421722 IS AN ASSOCIATED PROJECT.
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421720 IS AN ASSOCIATED PROJECT.
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 3
FISCAL YEAR
COST EST$
PE 1992
UNDERWAY
ROW 1995
$
123
CONST 1996
$ 2213
FED SHARE $ 1770
GA. SHARE $
443
0TH SHARE $
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1996
$ 4703
FED SHARE $ 3762
GA. SHARE $
941
0TH SHARE $
PE 1995 ROW LOCL CONST
$
8
AFTER 97
BROOKS 442682
STATUS:
CR 275@ PISCOLA CREEK APPROXIMATELY REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .22 MANAGER: J. LINDSEY SEND LGPA IN 1997
DIST. 2
SOURCE: BRIDGE PROGRAM HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
14
11.FTER 97
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CLAY 4Bl264
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH
CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FONDS
CLAY 4Bl265
STATUS:
COUNTY OPERATED PUBLIC TRANSIT FACILITIES/ FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH
CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FONDS
CLAY 4C2264
STATUS:
ONE CONVERSION VAN TRANSIT FACILITIES/ FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 2
FOND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FONDS
22-Feb-1994 Page 4
FISCAL YEAR
COST ESTS
OPERATING 1995 $
53
FED SHARE$
32
GA. SHARE$
0TH SHARE$
21
OPERATING 1996 $
55
FED SHARE$
33
. GA. SHARE $
0TH SHARE$
22
CAPITAL 1995
$
33
FED SHARE$
26
GA. SHARE$
4
0TH SHARE$
3
,,
l!l!!!!!!!!!I
~
~
~
.
COUNTY P. I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 5
FISCAL YEAR
COST ESTS
CLINCH 42242X
STATUS:
SR 89/US 441 FROM FLA STATE LINE TO CR UNKNOWN/ UNKNOWN PROJECT MILEAGE .00 - EXIST. LANES: 0 MANAGER:
FARGO/ECHOLS
0
PE 1996
CONG DIST, 8
ROW 1997
GRIP PROJECT
CONST
FUND SOURCE: GOVERNOR'S RD IMP PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS
$
0
$
0
AFTER 97
CLINCH 431065
STATUS:
SR 187@ SUWANNOOCHEE CRK OFLW REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: J. LINDSEY CLINCH COUNTY REFUSED
CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1995
$
1
CONST 1996
$
275
FED SHARE $
220
GA. SHARE $
55
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COFFEE 421240
STATUS:
SR 135/ US 221/ IN DOUGLAS @ SEVENTEEN -~_ILE RIVER REHAB. OF THE EXISTING BRIDGE (S). FROM 2\LANES TO 5 LANES. PROJECT MILEAGE : .20 MANAGER: J. LINDSEY SGN CITY/DOUGLAS FOR UTIL 5-9-89; COUNt*i1Ufi#:$ED 12-6-91
COFFEE 421320
STATUS:
cib&~l~'f~yp .?\t
SR 135 FM SR 32/DOUGLAS NE TO N
RECONSTRUCTION & . WIDENING FROl-1 2/LAN!tS TO 5 LANES.:
PROJECT MILEAGE : 3.10
J;g~) ~~~:: SgN ~~~~~~yR~W/UTtiii~ii; FROM CO WILL DO
6/92
CONG DIST; 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421320 IS AN ASSOCIATED PROJECT.
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421240 IS AN ASSOCIATED PROJECT.
COFFEE 421340
STATUS:
SR 32/DOUGLAS FH WCL~-,,~~:06 .. INCL 1-WAY PAI,J
RECONSTRUCTION & WIDENING/FROM 2 LANES TO 5 LANES:{::/:i==
PROJECT MILEAGE : 3.57 \)
MANAGER: M. REYNOLDS
):=\ ...
CITY OF DOUGLAS SIGNED 5/8/89{fq:El
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 431280 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 6
FISCAL YEAR
COST ESTS
PE 1986 UNDERWAY
ROW NONE
$
()
CONST 1995
$ 1656
FED SHARE $ 1325
GA. SHARE $
331
0TH SHARE $
PE 1992
UNDERWAY
ROW LOCL
CONST 1995
$ 2748
FED SHARE$ 2198
GA. SHARE$
550
0TH SHARE$
PE 199?.
UNDERWAY
ROW 1995
$ 2780
CONST 1997
$ 4402
FED SHARE $ 3522
GA. SHARE $ 880
0TH SHARE $
COFFEE 421345
STATUS:
COFFEE 422350
STATUS:
SR 32 FM W/CR 296 EAST TO WEST
RECONSTRUCTION & WIDENING FROM
DIST. 8
PROJECT MILEAGE : 4.13
MANAGER: M. REYNOLDS(CM)
SOURCE: SURFACE TRANSPORT.
COUNTY SGN UTIL ll-19-9l;CITY/DOUGLAS SR 135 AT MCDONALD ROAD IN DOUGLAS
~: y HIGHWAY ADMIN FUNDS
.
T:~b
~~~~~: rilt'" :~~JE~:~L,A!~~T~oo - EXIST. LANES: 0 /PROPOSED LANES::'& ):::
T~~i~D~!iRATIONS
COST EST 2-7-94 IN
9 C:ONG DisTC
.. > .
~:~ilitw:~T;if;j~~i:rr:~~ {
PE 1992
ROW 1997 CONST
UNDERWAY $ 3289 AFTER 97
PE 1994 UNDERWAY
ROW 1995
$
10
CONST 1996 $ 289
FED SHARE $ 289
GA. SHARE $
0TH SHARE $
COFFEE 431250
STATUS:
SR 135@ INTERSECTION OF CR 579; CR 146; CR 148
INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: J. LINDSEY
COFFEE SGNFOR UTILITIES 5-8-92
OTO
'CONG DIST. 2_
gwl1
1
FUND SOURcil
'. SAFETY
FEDERAL ItfoHWAY ADMIN
PE 1993 UNDERWAY
ROW 1995
$
3
<CONST 1995
$
383
FED SHARE $ 34"5
GA. SHARE $
38
0TH SHARE $
COFFEE 431280
STATUS:
LANDSCAPING/ST SCAPE MASTER PLAN DWTOWN DOUGLAS (421340) LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: M. REYNOLDS CITY/DOUGLAS SGN 12-14-92 ROW/UTIL & CST OVER $850,000.
CONG DIST .:.:8
FFUEDNDERASOLUHRICGEH:WATYRAANDSM{ IfNtkFU~NcDES.
421340 IS AN ASSOCIATED PROJECT.
PE LOCL ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
1388 1110
260 538
= = ,
I
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COFFEE 442600
STATUS:
SR 158 AT SHIRLEY AVENUE IN DOUGLAS TURN LANES/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: J. LINDSEY CONTACT TRAFFIC OPERATIONS
CONG DIST. 8
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
COFFEE 450380
STATUS:
SR 206/PERIMETER RD FM SR RECONSTRUCTION & WIDENING PROJECT MILEAGE : 1.80 MANAGER: J. LINDSEY (M) COFFEE SGN 10-14-93
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL ~IGHWAY ADMIN FUNDS
22-Feb-1994 Page 7
FISCAL YEAR
COST ESTS
PE 1994
UNDERWAY
ROW 1995
$
10
CONST 1996
$
289
FED SHARE $
289
GA. SHARE $
0TH SHARE $
PE 1992. ROW 1995 CONST
UNDERWAY
$
50
AFTER 97
COFFEE 471080
STATUS:
CR 598 OVER BEAR REPLACEMENT OF THE PROJECT MILEAGE: .20 MANAGER: J. LINDSEY SEND LGPA 10/94
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1995
$
8
ROW LOCL
CONST 1996
$
111
FED SHARE $
88
GA. SHARE $
22
0TH SHARE $
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTI~G BY COUNTY FY 1995/FY 1997
COMMENTS
COLQUITT SR 37/W. CENTRAL AVE@ llTH ST NB&SB IN::MOULTRIE & SIGNALS
442490 TURN LANES/ SAFETY
PROJECT MILEAGE: .50 - EXIST. LANES: 2 /JtOPOSED LANES: 3
MANAGER: J. LINDSEY
STATUS: CITY/MOULTRIE SGN 12-23-92 ROW &
. OTO
CONG DIST. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
:6klii~f: COLQUITT CR 477/COOL SPRINGS RD @ INDIAN
NE OF MOutiirE
442670 REPLACEMENT oF THE ExisTING BRIPGE/t{si No ADDED LAN'is.
PROJECT MILEAGE : .19
MANAGER: J. LINDSEY
STATUS: COLQUITT COUNTY SIGNED 10Alfa93 ioR ROW, UTILITIES dBlHouRs
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COLQUITT FM LOWER MEIGS RD IN '~6di.~~E s TO us 319 BP AND '.t&:kfkPORT
471030 BICYCLE/PED. FACILITY /t~llANCEMENT PROJECT MILEAGE : . 00 - EX{S'r. LANES: 0 /PROPO~$i~fus: 0 MANAGER: J. TOLSON
STATUS.: LGPA TO BE DONE BY CONTRACT
CONG DIST. 8 & 2
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4Bl408 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH STATUS:
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4B1409 TRANSIT FACILITIES/ OPERATIONS.
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH STATUS:
DIST. 8 & 2
SOURCE: RURAL TRANSIT T:7T7 ~7 ,~ TRANSIT ADMIN FUNDS
22-Feb-1994 Page 8
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW LOCL
CONST 1995
$
125
FED SHARE $
113
GA. SHARE $
13
0TH SHARE $
PE NONE
$
0
ROW LOCL
CONST 1996
$
104
FED SHARE $
83
GA. SHARE $
21
0TH SHARE $
PE LOCL
ROW NONE $
0
CONST 1997
$
568
FED SHARE $
454
GA. SHARE $
0TH SHARE $
114
OPERATING 1995 $
38
FED SHARE$
24
GA. SHARE$
0TH SHARE$
14
1996 $
40
FED SHARE$
25
GA. SHARE$
0TH SHARE$
15
,...
id
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COOK 410420
STATUS:
I-75@ SR 37/ADEL [FM 1500 FT WEST TO INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .40 - EXIST. LANES: "MANAGER: J. GARLAND REQ ADEL DO PUB UTIL 9-30-91;
I-75)
5
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
COOK
I-75 IMPROVE SANIATION,
410600 REST AREA/ RECST. OR REHAB.
PROJECT MILEAGE : .00 -
MANAGER: J. GARLAND
STATUS: - NOT APPLICABLE
6
CONG DIST. 8
4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
COOK 410620
STATUS:
I-75 R/W FOR HEART RIGHTS-OF-WAY/ OTHER PROJECT MILEAGE : .00 MANAGER: NOT APPLICABLE
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 9
FISCAL YEAR
COST ESTS
PE 1992 ROW 1996 CONST
UNDERWAY
$
100
AFTER 97
PE 1994 . UNDERWAY
ROW 1995 $
2
CONST 1995 $ 1783
FED SHARE $ 1605
GA. SHARE $
178
0TH SHARE $
PE NONE
$
0
ROW 1995
$
300
CONST NONE $
0
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CRISP 41025X
STATUS:
I-75 FM SR 159 NEAR ASHBURN TO SR 300 RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : .00 MANAGER: B FERGUSON
LGPA NOT APPLICABLE
TURNER
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410250 IS AN ASSOCIATED PROJECT.
CRISP 410260
STATUS:
I-75 FM l MILES OF CR 117 RECONSTRUCTION & WIDENING PROJECT MILEAGE : 7.13 MANAGER: B FERGUSON
CRISP SGN 4-24-92-NtO\f,}'(j-:~!.i~;~.t~":;l'\~~-
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410265 IS AN ASSOCIATED PROJECT.
CRISP 420605
STATUS:
SR 30/US 280 MP EB ADDITION OF A PASSING PROJECT MILEAGE : 2.50 MANAGER: J. LINDSEY CRISP COUNTY SGN 8-28-92
CONG DIST. 8
FUND SOURCE: NAT;L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CRISP 422190
STATUS:
SR 257 NEAR CORDELE@ MIDWAY RD/CR 266 & CR 353 RECONSTRUCTION & WIDENING. NO LANE ADDITION RO'.PO:S~IY{{/
PROJECT MILEAGE ; .50 MANAGER: J, LINDSEY (M) CONTACT TRAFFIC OPERATIONS
CRISP 470841
STATUS:
CR 241@ GUM CREEK/LAKE BLACKSHEAR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED PROJECT MILEAGE: .00 MANAGER:,J. LINDSEY CRISP SGN FOR ROW, UTILITIES& NECESSARY DETOURS
CRISP 471000
STATUS:
REHAB & RESTORE THE HISTORIC DISTRICT OF CORDELE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: J. TOLSON LGPA TO BE DONE BY CONTRACT
DIST. 8
FUND' SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
::::::::::::::i;;;:/::,.
DI~Ai ~
> FUND sbi:rncE: BRIDGE PROGili
FEDERAL HIGHWAY ADMIN FUNDS
\ g p N G D I S T . ...........
0
8
i J ...:,.&.<.,....=::2.:.:.:::.,:....:.
;~; souRcfl{~fus.
FEDERAL HIGllWAY ADMIN
22-Feb-1994 Page 10
FISCAL YEAR
COST ESTS
PE 1987 ROW 1997 CONST
UNDERWAY
$
0
AFTER 97
PE 1986 UNDERWAY
ROW NONE
$
0
CONST 1996
$ 10879
FED SHARE $ 8703
GA. SHARE $ 2176
0TH SHARE $
PE 1992
UNDERWAY
ROW 1994
UNDERWAY
CONST 1996
$ 1006
FED SHARE $
805
GA. SHARE $
201
0TH SHARE $
PE 1994
UNDERWAY
ROW 1995 $
3
CONST 1996
$
547
FED SHARE $
438
GA. SHARE $
109
0TH SHARE $
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$
310
FED SHARE $
248
GA. SHARE $
62
0TH SHARE $
PE 1995 $
6
ROW_NONE
$
0
1996
$
92
FED SHARE. $
74
GA. SHARE $
1
0TH SHARE $'_ 19
,.
C!!l!=:i
~
~
~
~
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 11
PROJ:ECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
----------------. --------------------------------------------------.-----------------------------------. ------------------------------
DECATUR SR 309@ BIG SLOUGH CREEK EAST OF SR
PE 1992
UNDERWAY
431050 REPLACEMENT OF THE EXISTING BRIDGES(S).
CONG DIST. 2
ROW 1994
$
5
PROJECT MILEAGE : .00
CONST 1995
$
409
MANAGER: J. LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
327
STATUS: DECATUR COUNTY SIGNED FOR UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
82
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DOUGHERT SR 91/ PHILEMA RD IN ALBANY@ MUCKAFOONEE CREEK
421270 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
PROJECT MILEAGE : .26
MANAGER: D. CHURCH
,
STATUS: SIGNED BY ALBANY 3/24/87 FOR UTILITIES/\
ALBANY TIP i B-2
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421420 IS AN ASSOCIATED PROJECT.
DOUGHERT 421420
STATUS:
@ MUCiliOONEE CK LANES.\
ALBANY TIP i H/R-9
CONG_DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421270 IS AN ASSOCIATED PROJECT.
DOUGHERT SR 520/US 82/0GLETHO:;;;;:gf~ FM US 19 TO LOFTUS s,t/jjjfuy
421580 RECONSTRUCTION & WIDENING/FROM 4 LANES TO 6 LANES;/ : }:/
PROJECT MILEAGE_: .50
u;'itHz~~- STATUS: ~~;~R~I~NEgH~~~~89 FOR
(S,ALE$!:i:i:!Ji!i6JEt'l'}
ALBANY TIP i HR/11
CONG DIST. 8 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
DOUGHERT SR 3/US 19 AT PROCTOR & GAMBLE IN 422330 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .38 - EXIST. LANES: 0 MANAGER: J. LINDSEY STATUS: CONTACT TRAFFIC OPERATIONS
::ft:LBANY TIP i H/R-2 :':\\?~ONG DIST. 2
-.. FUND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
DOUGHERT SR 234/GILLIONVILLE RD FM EIGHT ML RD TO L~:!!~STATION 450490 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.17
MANAGER: UNKNOWN STATUS: SEND LGPA WHEN ADDED TO CWP
>~ONG Drsl\ !~
FUND ''18\:ffidf: SURFACE i TRJU.is;bRT
FED!!:lli HiGHWAY ADMIN FUNDS
22-Feb-1994 Page 12
FISCAL YEAR
COST ESTS
PE 1986
UNDERWAY
ROW NONE
$
0
CONST 1996
$ 1555
FED SHARE $ 1244
GA. SHARE $
311
0TH SHARE $
PE 1992
UNDERWAY
ROW LOCL
CONST 1996
$ 2408
FED SHARE$ 1926
GA. SHARE$
482
0TH SHARE$
PE 1993 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995
$
946
FED SHARE $
757
GA. SHARE $
189
0TH SHARE $
PE NONE
$
0
ROW NONE $
0
CONST 1995 $
30
FED SHARE$
30
GA. SHARE$
0TH SHARE$
PE ROW LOCL CONST
$. 173 AFTER 97
DOUGHERT SR 234/GILLIONVILLE RD FM LOCKETT STATION RD TO BEATTIE RD 450495 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .62 MANAGER: UNKNOWN STATUS: SEND LGPA WHEN ADDED TO CWP
DOUGHERT D'TOWN ENHANCEMENT OF ALBANY/TRAILS,LANDSCAPING,RAIL TERMINA 470910 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: T. LONG STATUS: TO BE DONE BY CONTRACT.
t ::toNG
FUND SOURCt: :sbRFACE
FEDE..-.R...A-L--:.:H-:--i-.c..i.i.i...#. .AY
~~!/: ALB~::
TSM-5
CONG DIST. 'ig
FUND souRcE = TRANS z,tHi.iiANcE. FEDERAL HIGHWAY ADMINFUNDS
PE ROW LOCL .. CONST
$
62
AFTER 97
PE 1996 $
ROW 1996
$
CONST 1996 $
FED SHARE $
GA. SHARE $
0TH SHARE $
50 200 1844 1475
50 419
~
~
~
~
'
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 13
FISCAL YEAR
COST ESTS
DOUGHERT WHEELCHAIR LIFTS FOR PARATRANSIT 4Dl013 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
CONG DIST. 2 & 8
CAPITAL 1995
$
5
FUND SOURCE: URBAN TRANSIT DISC,
FED SHARE$
5
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
DOUGHERT WHEELCHAIR LIFTS FOR TRANSIT
4D1015 TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ALBANY MANAGER: STEVE KISH
STATUS: LGPA NOT APPLICABLE
CONG DIST. 2 & 8
CAPITAL 1996
$
50
FUND _SOURCE: URBAN TRANSIT DISC.
FED SHARE $
45
FEDERAL TRANSIT ADMIN FUNqS
GA. SHARE$
3
0TH SHARE$
3
DOUGHERT VEHCLES, SHELTERS,
4D4011 TRANSIT PROJECTS/ FUNDS RECIPIENT: ALBANY MANAGER: STEVE KISH
STATUS: LGPA NOT APPLICABLE
CONG DIST. 2 & 8
CAPITAL 1995
$ 101
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
81
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
10
0TH SHARE $
10
DOUGHERT FACILITY IMP., CAP. MAINT., SHELTERS, FURNITURE, 4D4012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
DIST. 2 & 8
CAPITAL 1996
$
SOURCE: URBAN TRANSIT DISC.
FED SHARE $
TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
1527
1222 152 153
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF 4D4017 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY 4D4018 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
DIST. 2 tC:ii jjll! }
SOURcf:;::81;: TRANSIT FEDERAL.TRANSIT ADMIN
717 359 359
1996 $ 737 FED SHARE$ 369 GA. SHARE$ 0TH SHARE$ 369
DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 4Vl011 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH STATUS:
CONG DIST.
FUND SOURCE: FEDERAL TRANSIT
CAPITAL 1995
$
21
FUND FED SHARE$
17
GA, SHARE$
2
0TH SHARE$
2
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 14
FISCAL YEAR
COST ESTS
DOUGHERT ELDERLY AND DISABLED VEHICLES AND 4Vl012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN MANAGER: STEVE KISH STATUS:
CONG DIST. 8 & 2
CAPITAL 1996
$
22
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
18
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
2
0TH SHARE$
2
,,
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
EARLY 421640
STATUS:
US 27@ WAMBLE CREEK SOUTH OF BLAKELY.
REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: J. GARLAND (M) EARLY COUNTY SIGNED FOR UTILITIES
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 422210 IS AN ASSOCIATED PROJECT.
EARLY 422090
STATUS:
SR 62/BLAKELY FM WEST OF SR RECONSTRUCTION & WIDENING PROJECT MILEAGE : 1.70 MANAGER: J. LINDSEY (M) BLAKELY SGM 12-1-92 -
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 15
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW NONE $
0
CONST 1997
$
230
FED SHARE $
184
GA. SHARE $
46
0TH SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY
$
10
AFTER 97
EARLY 431320
STATUS:
SR 1 OVER BLUE CREEK
REPLACEMENT OF THE PROJECT MILEAGE : .00 MANAGER: J. GARLAND SEND LGPA IN 1995
EARLY 471110
STATUS:
COHEELEE CREEK COVERED BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER: UNKNOWN DOT WILL PROVIDE THE 20% MATCH
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
SOURCE: TRANS. ENHANCE. HIGHWAY ADMIN FUNDS
PE 1994. UNDERWAY
ROW 1996
$
1
CONST 1996
$
369
FED SHARE $ 295
GA. SHARE $
74
0TH SHARE $
PE NONE $
0
ROW NONE $
0
CONST 1995 $
49
FED SHARE$
39
GA. SHARE$
10
0TH SHARE$
r
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 16
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
-P-.-I.-N-O--.----------------P-R-O-JE-C--T-DA-T-A----------------------------------------------C-O-M-M--EN-T-S---------------------------Y-E-A-R---------E-S-T-S--
ECHOLS SR 187@ SUWANNOCHEEE CRK /ALSO CLINCH -~r,n~r~v
PE 1992
UNDERWAY
431060 REPLACEMENT OF THE EXISTING BRIDGES(S).
CONG DIST. 8
ROW 1995
$
1
PROJECT MILEAGE : .00
CONST 1996
$ 1366
MANAGER: J, LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $ 1093
STATUS: ECHOLS SGN 4-6-92 FOR UTILITIES;
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
273
0TH SHARE $
' ~
~
~
~
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 17
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
---------------------------------------------------------------------------------------------------.-------------------.-------------
GRADY SR 112 SB MP 2.3 TO 3.3; NB
PE 1992 UNDERWAY
421940 ADDITION OF A PASSING LANE.
CONG DIST. 2
ROW 1993 UNDERWAY
PROJECT MILEAGE : 2.00
CONST 1995
$
697
MANAGER: J. LINDSEY STATUS: GRADY COUNTY SIGNED 10/26/90
rt'fl]f]ihi""
FUND souRcE: suRFAcE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE $
558
GA. SHARE $
139
0TH SHARE $
GRADY 422180
STATUS:
SR 111@ SOFKEE CRK N/CR 81
REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: J. LINDSEY GRADY SIGNED 2-18-92
_.,,,,,,,,,,,,,,;,,,;,,
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1995 $
1
CONST 1996
$
531
FED SHARE $
425
GA. SHARE $
106
0TH SHARE $
GRADY 431330
STATUS:
SR 111 OVER TURKEY REPLACEMENT OF THE PROJECT MILEAGE : .00 MANAGER: J. LINDSEY GRADY COUNTY SIGNED FOR
iLl,i~.~-
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1995 $
1
CONST 1996
$
391
FED SHARE $
313
GA. SHARE $
78
0TH SHARE $
GRADY 442550
STATUS:
SR 188 OVER WEST BRANCH BARNETTS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: J. LINDSEY
SEND LGPA IN 1995
.,,)}})()(}
<\}@/!]]/{/
DIST. 2
SOURCE: BRIDGE PROGRAM HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW 1996 $
1
CONST 1997
$
321
FED SHARE $
257
GA. SHARE $
64
0TH .SHARE $
GRADY 442552
STATUS:
SR 188 OVER BARNETTS CREEK/THOMAS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: J. LINDSEY SEND LGPA IN 1995
PE 1994
UNDERWAY
ROW 1996 $
1
CONST 1997
$
496
FED SHARE $
397
GA. SHARE $
99
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPf<.Y.fEMENTS PROGRAM
PROJ2.CT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
IRWIN 421960
STATUS:
SR 11/US 129@ REEDY CRK & STUMP CRK. REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .00 MANAGER: J, LINDSEY SGN BY COUNTY 5-16-91 AND OCILLA
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
IRWIN 471070
STATUS:
CR 181/SATILLA CHURCH RD. @ REPLACEMENT OF THE EXISTING~~~~,~~'~ PROJECT MILEAGE : .22 MANAGER: J, LINDSEY
SEND LGPA 10/94
CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 18
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1995
$
10
CONST 1995
$
716
FED SHARE $
573
GA. SHARE $
143
0TH SHARE $
PE 1995
$
8
ROW LOCL
CONST 1996
$
437
FED SHARE$ 350
GA. SHARE$
87
0TH SHARE$
IIZlm5!:II
IIIDC3
~
~ ,,
1:1.'lmm
~
F . . . ..,..
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 19
FISCAL YEAR
COST ESTS
LOWNDES 42172X
STATUS:
SR 133 FM W/CR 276 TOE. OF WITHLACOOCHEE/ SEE BROOKS RECONSTRUCTION & WIDENING. NO LANE ADDI1ION PROPOSED. .PROJECT MILEAGE : . 00
MANAGER: K FULBRIGHT
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 421720 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1995
$
0
CONST 1996
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
LOWNDES 422280
STATUS:
i&Rif SR 125 FM CR 188 TO MOODY AFB Noi~il:
IN
RECONSTRUCTION & WIDENING FROM'4 LANES TO 5 LANES,?
f ~;it:t~g~;~~r~~:]7bITi:~~~: i;~2 PUB UTL (EXCEl~ :#ATER)
~~~~~$
STATUS:
;~~i!]i i :c~,~;Ri~T~~Ns~
1
I~ov~~s~DITION PROP61i6W
PROJECT MILEAGE : .00
MANAGER: J. LINDSEY
.
REQ VALDOSTA DO ROW & UTILITfES}~_,J.8-94
CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
LOWNDES 431340
STATUS:
.7j;:~! ONE-WAY PAIR ASHLEY & PATTERSON FM N' SIDE DR TO SR
ff::/: ,: "'
MINOR WIDEN & RESURF / RECST. OR REHAB.
. ,
\ jdONG DIST. 8
PROJECT MILEAGE : .49 - EXIST. LANES: 2 /PROPOSEO:=LJWES: 4
MANAGER: J. LINDSEY
FUND SOURCE: SURFACE TRANSPORT.
VALDOSTA SGN 5-20-93 FOR ROW & UTILITIEs.''9.9yJ1ff/;i:)&iA N/A
FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW 1995
$
500
CONST 1996 $ 8500
FED SHARE $ 6800
GA. SHARE $ 1700
0TH SHARE $
PE NONE $
0
ROW LOCL
CONST 1996
$
116
FED SHARE $
116
GA. SHARE $
0TH SHARE $
PE NONE $
0
ROW 1995 $
1
CONST 1996 $ 200
FED SHARE $
HO
GA. SHARE. $
40
0TH SHARE $
LOWNDES 442560
STATUS:
OLD CLATTVILLE RD/CR 785 FM E/I-75 TON OF IND;i\rRIAL BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.80 MANAGER: RAY METTS (M) SEND LGPA IN 1997
::::::
t>cQNG Dist1.#
Fm,;;: ib&kff: SURFACE T~;J8ki Y> .
FEDERA,L HIGHWAY ADMitr'E'oNDs
442565/:i:s AN ASSOCIA'.rl,fi:i\PROJECT.
:t r
PE 1996 ROW LOCL CONST
$
80
AF.TER 97
LOWNDES 442565
STATUS:
OLD CLATTVILLE RD/CR 785 OVER MUD CREEK IN VALDOSTA REPLACEMENT OF THE EXISTING BRIDGES($). FROM 2 TO 4 LANES. PROJECT MILEAGE : 00 MANAGER: RAY METTS (M) SEND LGPA IN 1997
PE 1996_ ROW LOCL
$
10
AFTER 97
LOWNDES 450430
STATUS:
SR 7/US 41 AT JAMES BECK OVERPASS IN VALDOSTA INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: J. LINDSEY VALDOSTA SGN 5-20-93 FOR UTILITIES; COUNTY LGPA - N/A
FUND SOURCE: HWY FEDERAL HIGHWAY
PE NONE
$
0
ROW 1995 $
6
CONST 1996 $
50
FED SHARE$
45
GA. SHARE$
5
0TH SHARE$
COUNTY P,I,NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
LOWNDES 450440
STATUS:
GORDON STREET/CR 555/CR 720 FM BAYTREE RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : 2.87 MANAGER: RAY METTS (M) SEND LGPA IN 1996
ST CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 20
FISCAL YEAR
COST ESTS
PE 1996 ROW LOCL CONST
$
86
AFTER 97
LOWNDES NOAK STREET FM BAYTREE ROAD TO
450450 !~~~~~!iL'A~~~T~32 - EXIsTfrDffikf: 2 /PROPOSED i:.Wts: 3
~~~!~l STATUS:
~GNL;~~~~!3 Rowl~~~~if~Es; cooNTY NOT APfi2ABLE
:~~~=~g/~:;;;:!lt:;..:~~: LOWNDES
471010
PATHS riJfINo
PROJECT MILEAGE : . oo - EXIST. LANES: o /PROPOSl!:b iiANts: o
MANAGER: CHRIS SIMONS
\
........... .
STATUS: LGPA TO BE DONE BY CONTRACT ....
CONG DIST. 2 FUND SOURCE:-HWY. SAFETY FEDERAL HIGHWAY ADMIN FONDS
CONG DIST, 2 FOND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW LOCL
CONST 1996
$
150
FED SHARE $
135
GA. SHARE $
15
0TH SHARE $
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
1250 1000
250
...
~
~
liml'm'l
~
~
~
,..
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT 0~ TRANSPORTATION DRAFT, STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MILLER 421715
STATUS:
SR 1/US 27@ SPRING CREEK REHAB. OF THE EXISTING BRIDGE(S). PROJECT MILEAGE : .50 MANAGER: M GANNAWAY CITY OF COLQUITT SGN 8/89 UTL;DOT
4 LANES. LEWIS.
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS 421710 IS AN ASSOCIATED PROJECT.
MILLER 470861
STATUS:
CR 183/UNION CH RD@ AYCOCKS REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: J. LINDSEY REQ MILLER CO DO
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 21
FISCAL YEAR
COST ESTS
PE 1990 ROW NONE
UNDERWAY
$
o
CONST 1995
$ 1169
FED SHARE $
935
GA. SHARE $
234
0TH SHARE $
PE 1991
UNDERWAY
ROW LOCL
CONST 1997
$
54
FED SHARE $
43
GA. SHARE $
2
0TH SHARE $
13
COUNTY P,I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MITCHELL CR 250@ BIG SLOUGH WEST OF CAMILLA 470880 REPLACEMENT OF THE EXISTING BRIDGES($):
PROJECT MILEAGE : .00 MANAGER: J. LINDSEY STATUS: MITCHELL COUNTY SIGNED ROW,
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MITCHELL RESTORE MITCHELL DRUG 471020 MISCELLANEOUS IMPROVEMENTS
PROJECT MILEAGE : .00 MANAGER: J. TOLSON STATUS: LGPA TO BE DONE BY
CONG DIST. 2 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 22
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$
340
FED SHARE $
272
GA. SHARE $
68
0TH SHARE $
PE 1996
$
ROW 1996
$
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
20 45 307 246'
14 75
..
~
~
~
~
COUNTY P. I .NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
QUITMAN 431290
STATUS:
SR 27/SR 39: OVER TOBANNEE CREEK NORTH REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: J. LINDSEY SEND LGPA IN 1996
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 23
FISCAL . YEAR
COST ESTS
PE 1995 ROW 1997 CONST
$
10
$
1
AFTER 97
QUITMAN 4B1269
STATUS:
COUNTY OPERATED PUBLIC TRANSIT
TRANSIT FACILITIES/ FUNDS RECIPIENT: QUITMAN MANAGER: STEVE KISH
QUITMAN 4B1270
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: QUITMAN MANAGER: STEVE KISH
CONG DIST. 2
OPERATING 1995
$
24
FUND SOURCE: RURAL TRANSIT
FED SHARE $
14
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
10
CONG DIST. 2
OPERATING 1996
$
25
FUND SOURCE: RURAL TRANSIT
FED SHARE $
15
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
10
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 24
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O--. ---------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M--M-E-N-TS----------------------------Y-EA-R---------E-S-T-S--
RANDOLPH CR 134/CR 134@ SOUTHERN RAILROAD 2 MI
PE 1995
$
8
471060 REPLACEMENT OF THE EXISTING BRIDGES(S).
CONG DIST. 2
ROW LOCL
PROJECT MILEAGE : .21
CONST 1997
$
346
MANAGER: J. LINDSEY
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$
277
STATUS: SEND LGPA 10/94
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
69
0TH SHARE$
~
~
c~@,t,....~.a
1
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
SEMINOLE SR 253@ FISH PONO DRAIN N OF SR 39 431080 REPLACEMENT OF THE EXISTING BRIDGES($).
PROJECT MILEAGE : .00 MANAGER: J. LINDSEY STATUS: COUNTY SIGNED 7-8-91 FOR UTILITIES.
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
SEMINOLE CR 49/GATOR PONO ROAD OVER
462470
REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .13
~~.t0 ,ft~?:'
MANAGER: J. LINDSEY (M)
STATUS: SEMINOLE SGN 9-14-92
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
f,
22'-Feb-1994 Page 25
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1995
$
1
CONST 1995 $ 500
FED SHARE $
400
GA. SHARE $ 100
0TH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1995 $ 252
FED SHARE$ 202
GA. SHARE$
50
0TH SHARE$
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TERRELL 421980
STATUS:
SR 49@ KINCHAFOONEE CREEK/ ALSO REHABILITATION OF THE EXISTING BRIDGE PROJECT MILEAGE : .00 MANAGER: J. LINDSEY TERRELL SGN 8-7-91 AND SUMTER SGN
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TERRELL 422370
STATUS:
SR 45 AT SR 520 IN DAWSON INTERSECTION IMPROVEMENT/ PROJECT MILEAGE : .20 MANAGER: J. LINDSEY REQ CITY OF DAWSON DO
CONG DIST. 2
3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
TERRELL 442570
STATUS:
SR 55 REALIGNMENT FM RECONSTRUCTION & MT~~~T~~'
PROJECT MILEAGE : .40 MANAGER: J. LINDSEY
\ERRELL SIGNED TO DO
CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 26
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1995
$
1
CONST 1996
$ 1435
FED SHARE $ 1148
GA. SHARE $ 287
0TH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1996 $
17
FED SHARE$
17
GA. SHARE$
0TH SHARE$
PE NONE
$
0
ROW 1996 $
8
CONST 1997
$
125
FED SHARE$
100
GA. SHARE$
25
0TH SHARE$
,,
,,
't
Bml!%!ll
im::::m
~
~
~
~
~
~
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
THOMAS SR 122 WB MP 4.4 TO 5.4; EB MP 7.3 TO 8,3
421830 ADDITION OF A PASSING LANE.
.~ai~ STATUS:
~:r:;i;~~~t::ITIES; THOMASVIL~~ :~~11::j/92 PUB UTIL.
tiII:: ~.!~~~:~ ~~S ~:~t! THOMAS
421970
TiiE c:~1:,:1
ADDE~,~S.
~ai~~:r:t!!g~~f STATUS:
0:-127~i.~:::#.8tsVILLE SGN 2-12-9~ ~;IL.
CONG DIST. 2 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
!~~~~
STATUS:
tl~~t ::P~ic:Mi;;cg~AT~~:~:~4~t.B~;ig~ES (s) . NO ADDED
PROJECT MILEAGE : .00 MANAGER: J. LINDSEY
THOMAS COUNTY SIGNED FOR
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
THOMAS 442500
STATUS:
METCALFE ROAD/CR 384 OVER PINE CREEK REHABILITATION OF THE EXISTING BRIDGE(S). PROJECT MILEAGE : .23 MANAGER: J. LINDSEY (M) SEND LGPA IN 1995
DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
THOMAS 450460
STATUS:
cs 245/PINE TREE BLVD@ OLIVE CK/THOMASVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .20
~!~:Rlo~26~~~D!E~ITY SGN 11-9-93 FOR ROW, UTIL & DETotik.f
THOMAS 470693
STATUS:
CR 36/POPE,ROAD OVER PISCOLA CREEK
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE. : .10 MANAGER: J. LINDSEY THOMAS SGN FOR ROW, UTILITIES & DETOURS 7-1-92.
it CONG DisfJ
iav!8f F~:~::
BRIDGE PROG~J?
FEpEifilili\JiIGHWAY ADMIN toNDS
i,,~~G :::T. 201f!1irl!I
FUND SOURdih ii{foGE PROGRAM FEDERAL Jifoa#A.y ADMIN
22-Feb-1994 Page 27
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$
600
FED SHARE $
480
GA. SHARE $
120
0TH SHARE $
PE 1992
UNDERWAY
ROW 1995
$
1
CONST 1996
$ 2124
FED SHARE $ 1699
GA. SHARE $
425
0TH SHARE $
PE 1992
UNDERWAY
ROW 1995
$
1
CONST 1996
$
751
FED SHARE $
601
GA. SHARE $
150
0TH SHARE $
PE 1994
UNDERWAY
ROW LOCL
CONST 1997
$
329
FED SHARE $ 263
GA. SHARE $
66
0TH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1996
$
388
FED SHARE $
311
GA. SHARE $
78
0TH SHARE $
PE 1993 UNDERWAY
ROW LOCL
1995
$
160
FED SHARE $
128
GA. SHARE $
32
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TIFT 410580
STATUS:
I-75 AT 2ND STREET AND 8TH STREET/TIFT0?-1
LANDSCAPING / ENHANCEMENT
''' .
PROJECT MILEAGE : oo - EXIST. LANES: o lJ~oPosED LANES: o
~F =A~i~~ ii~~~o~AY 50% OF coNsTRQcf8Jj!osT 2-9-94
CONG DIST. 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
TIFT 422170
STATUS:
SR 125/TIFTON FM 20TH ST TO 40TH:
i%.f:&s: TURN LANES / SAFETY
......
\ \
PROJECT MILEAGE : 1. 05 - EXISf:?'
0 /PROPOSED 'LANES: 0
MANAGER: J. LINDSEY
< ' ):
REQ TIFTON DO UTILITIES 1Q42o#92; COUNTY N/A 11-13-~2(
TIFT 471040
STATUS:
1
if*i RESTORE MONTEZUMA D;;J
GEORGIA AGRIRAMA
' )'
1
1
1 1: : ~!;~~i~i~~iGiM~R~~M~Nti!,T~N~i!~E~T/PROPOSEO
0
MANAGER: J. TOLSON
LGPA TO BE DONE BY CONTRACT
CONG DIST. 8 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
TIFT 4B1274
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TIFT MANAGER: STEVE KISH
DIST. 8
TRANSIT ADMIN FUNDS
TIFT
COUNTY OPERATED PUBLIC TRANSIT SERVICE
4B1275 . TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: TIFT
MANAGER: STEVE KISH.
STATUS:
22-Feb-1994 Page 28
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
80
FED SHARE $
64
GA. SHARE $
24
0TH SHARE $
40
PE 1992
UNDERWAY
ROW 1995
$
230
. CONST 1996
$
567
FED SHARE $
510
GA. SHARE $
57
0TH SHARE $
PE LOCL
ROW NONE
$
0
CONST 1995
$
110
FED SHARE $
88
GA. SHARE $
0TH SHARE $
22
OPERATING 1995
$
53
FED, SHARE$
.31
GA. SHARE$
0TH SHARE$
22
1996
$
55
FED SHARE$
32
GA. SHARE$
0TH SHARE$
23
,,
mmm c::m=
~
==i
~
.. :-.::
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TURNER 410245
STATUS:
I-75 FM THE TIFT COUNTY LINE TO SR 159 RECONSTRUCTION & WIDENING FROM 4 LANES PROJECT-MILEAGE : 11.07 MANAGER: B FERGUSON (M) TURNER SGN 4-20-92 UTILITIES; ASHBURN
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
TURNER 410250
STATUS:
I-75 FM SR 159 NEAR ASHBURN RECONSTRUCTION & WIDENING PROJECT MILEAGE : 16.50
MANAGER: B FERGUSON (M) REQ TURNER AND CRISP DO
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN .FUNDS
TURNER 410590
STATUS:
I-75 REST AREAS REST AREA/ RECST. OR PROJECT MILEAGE : .00 MANAGER: J. GARLAND NOT APPLICABLE
CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
TURNER 431300
STATUS:
SR 032 OVER LITTLE SAND CREEK REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .00 MANAGER: J. LINDSEY SEND LGPA IN 1996
DIST. 8
SOURCE: BRIDGE PROGRAM HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 29
FISCAL YEAR
COST ESTS
PE 1995 ROW CONST
$
245
AFTER 97
AFTER 97
PE 1987 ROW 1997 CONST
UNDERWAY $ 13000 AFTER 97
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1995 - $ 1600
FED SHARE $ 1440
GA. SHARE $
160
0TH SHARE $
PE 1995 ROW 1997 CONST
$
10
$
1
AFTER 97
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
G~UHGlA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WARE 422125
STATUS:
SR 38/US 84@ SUWANNEE CRK REHAB. OF THE EXISTING BRIDGE(S). PROJECT MILEAGE : .00 MANAGER: GENE POWELL (M)
SEND LGPA IN 1996
CONG DIST. 1 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 30
FISCAL YEAR
COST ESTS
PE 1995 ROW NONE CONST
$
4
$
0
AFTER 97
'
~
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WILCOX 421962
STATUS:
SR 11/US 129 ~ FOLSOM CRK;CEDAR CRK; REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: J. LINDSEY WILCOX COUNTY SIGNED FOR UTILITIES
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
WILCOX 422080
STATUS:
SR 30 EB FM.MP 14.5-16.0;WB
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.70 MANAGER: J. LINDSEY WILCOX SIGNED 8-26-91
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
WILCOX 422310
STATUS:
SR 30/US 280: REPLACEMENT OF THE PROJECT MILEAGE : .00 MANAGER: J. LINDSEY SEND LGPA IN 1996
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 31
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1995
$
3
CONST 1996
$ 1274
FED SHARE $ 1019
GA. SHARE $
255
0TH SHARE $
PE NONE
$
0
ROW 1993
UNDERWAY
CONST 1995
$
844
FED SHARE $
675
GA. SHARE $
169
0TH SHARE $
PE 1995 ROW 1997 CONST
$
10
$
1
AFTER 97
WILCOX 4Bl279
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WILCOX MANAGER: STEVE KISH
WILCOX 4Bl280
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WILCOX MANAGER: STEVE KISH
WILCOX 4C2279
STATUS:
ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILCOX MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 8
OPERATING 1995 $
40
SOURCE: RURAL TRANSIT
FED SHARE$
24
I/7/!.fDDt:'.,:_..:TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
16
42 25
17
souRcffr~!~
FEDEJ:lAI,. d@wlfT
1995
$
33
FED SHARE$
26
GA. SHARE$
4
0TH SHARE$
3
COUNTY P;I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WORTH 470890
STATUS:
CR 164/ELM STREET OVER WARRIOR CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: J. LINDSEY WORTH SGN 5/92 PUB UTIL;POULAN SGN
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 32
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 251
FED SHARE$ 201
GA. SHARE$
50
0TH SHARE$
,,
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BACON 520910
STATUS:
SR 32/ALMA@ HURRICANE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : . 65 MANAGER: PETE BLOCKER
BACON SIGNED UTILITIES 6-17-91
2 TO 4 LANES,
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 522125 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 1
FISCAL YEAR
COST ESTS
PE 1983
UNDERWAY
ROW NONE
$
0
CONST 1996
$ 1661
FED SHARE $ 1329
GA. SHARE $
332
0TH SHARE $
BACON 522120
STATUS:
SR 32, EB MP 13.4-14.6; ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.20 MANAGER: PETE BLOCKER
BACON SGN FOR
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1995
$
12
CONST 1996
$
450
FED SHARE $
360
GA. SHARE $
90
0TH SHARE $
BACON 522125
STATUS:
SR 32/ALMA FROM SR. RECONSTRUCTION & PROJECT MILEAGE : 3.10 MANAGER: PETE BLOCKER CITY OF ALMA SGN 5/21/90,
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 520910 IS AN ASSOCIATED PROJECT.
PE 1992
UNDERWAY
ROW 1993 UNDERWAY
CONST 1996
$ 1997
FED SHARE $ 1598
GA. SHARE $
399
0TH SHARE $
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY.1997
coMMENTS
BRANTLEY CR 11@ MILL CREEK WEST OF HOBOKEN 570925 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE: .20 MANAGER: STATUS: BRANTLEY SGN DO ROW, UTILITIES &
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS
22-Feb-1994 Page 2
FISCAL YEAR
COST ESTS
PE 1994 UNDERWAY
ROW LOCL
CONST 1996 $ 144
FED SHARE$ 115
GA; SHARE$
29
0TH SHARE$
t ~,
:
,,
l!&'!m
im=::,
l!l!l!!ffl!!I
l!!'l'!!!"!I
~
~
~
~
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BRYAN 511190
STATUS:
I-16 WIDEN 10 BRIDGES@ MP 138.3; 145.9b 146.6; 146.8; 147.2 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: GENE POWELL (M) _ REQ BRYAN DO UTILITIES 10-5-93
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
~~i!;:r:~~~t~~~: BRYAN
521750 STATUS:
:c~~~;:g~~~~~ :r~iD~~r!~ ~!6Mi~~1,~!g~~c:E~~~f OFLW BR
0
UTILf&iH'i 100% PRIVATE UTIL !]iijk4-93
BRYAN 521755
STATUS:
:~!~:i11 WIDEN & NEW ~RIDGE
dkKL @ OGEECHEE RIVER/ALSO
co
BRIDGES / NEW CONSTRUCTIQlt
PROJECT MILEAGE : .36
MANAGER: M. REYNOLDS
BRYAN COUNTY SIGNED FOR
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521750 rs AN ASSOCIATED PROJECT.
22-Feb-1994 Page 3
FISCAL YEAR
COST ESTS
PE 1994
UNDERWAY
ROW NONE
$
0
coNST 1997 $ 2502
FED SHARE $ 2252
GA. SHARE $
250
0TH SHARE $
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995 $ 3732
FED SHARE $ 2986
GA. SHARE $
746
0TH SHARE $
PE 1991 UNDERWAY
ROW NONE $
0
CONST 1995 $ 2388
FED SHARE $ 1910
GA. SHARE $
478
0TH SHARE $
BRYAN 532370
STATUS:
SR 144 EB FM S OF CR 244/ML 14 TON ADDITION -OF A PASSING LANE. PROJECT MILEAGE : 1.50 MANAGER: PETE BLOCKER SEND LGPA WHEN PROJECT rs ADDED TO CWP
DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE ROW CONST
$
15
AFTER 97
AFTER 97
BRYAN 532410
STATUS:
CR 90/BELFAST-KELLER RD OVER TIVOLI RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .20 MANAGER: PETE BLOCKER BRYAN SGN DO ROW, UTILITIES AND DETOURS 7-24-92
BRYAN 5Bl284
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH
BRYAN 5Bl285
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSiT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH
BRIDiIBGME rNPR,ftOrnGos~:)
PE 1994 UNDERWAY
ROW LOCL
CONST 1995
$
341
FED SHARE$
273
GA. SHARE$
68
0TH SHARE$
FUND souRciff\i6fu TRANSIT
+O~ERATING 1995 $ FED SHARE$
91 53
FECiEJ.YU, ,tfuilisfr ADMIN FUNDS.
GA. SHARE$
0TH SHARE$
38
CONG DIST. \1
OPERATING 1996 $
95
FUND SOURCE: RURAff~~IT
FEDERAL TRANSIT MMJN FUNDS
FED SHARE$
55
GA. SHARE$
0TH SHARE$
40
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
BRYAN 5C2284
STATUS:
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH LGPA NOT APPLICABLE
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS. PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 4
FISCAL YEAR
COST ESTS
CAPITAL 1995
$
32
FED SHARE$
26
GA. SHARE$
3
0TH SHARE$
3
;,
lll!ll!Z!ll
~
~
~
eml:!3
~
1..............,;
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BULLOCH 521170
STATUS:
SR 7 3 W @ LOWER LOTTS CRK 6 MI S.OUTH OF/:STATESBORO
BRIDGE REMOVAL / REPLACEMENT
,::-:.
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: PETE BLOCKER
. .....
BULLOCH COUNTY SIGNED 1-7-92 FOR UTILtii'j:\.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 5
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
R,OW 1995
$
1
CONST 1995
$
96
FED SHARE $
77
GA. SHARE $
19
0TH SHARE $
BULLOCH 521270
STATUS:
SR 67 FM CR 248/585 NORTH
RECONSTRUCTION & WIDENING
5
PROJECT MILEAGE : 1.40
c:qfill4~ ~~~::~R;E;~NB~~~~!~ &
~'bN 6-5-91 FOR UTILI'.i){Jl:$
BULLOCH 521275
STATUS:
SR 67 @ LITTLE LOTTS '&Md}(
REPLACEMENT oF THE ExisTb~G BRIDGES cs) No ADDEt>,
PROJECT MILEAGE : .20
MANAGER: PETt BLOCKER
...
BULLOCH COUNTY SIGNED 6/14/!:}Q
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521275 IS AN ASSOCIATED PROJECT.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521270 IS AN ASSOCIATED PROJECT.
PE 1992 ROW 1995 CONST
UNDERWAY
$
80
AFTER 97
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1997
$
641
FED SHARE $
513
GA. SHARE $
128
0TH SHARE $
BULLOCH 522230
STATUS:
OLD SR 46@ BLACK CREEK 1.2 MI W/SR 26 REPLACEMENT OF THE EXISTING BRIDGES (S) . PROJECT MILEAGE :. . 00 MANAGER: PETE BLOCKER BULLOCH COUNTY SGN FOR ROW & UTILITIES
DIST. 1
SOURCE: BRIDGE PROGRAM HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995 $ 859
FED SHARE$
687
GA. SHARE$
172
0TH SHARE$
BULLOCH 522460
STATUS:
SR 67 FM I-16 TO STATESBORO BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 10. 70 .
MANAGER: RAY METTS (CM) SEND LGPA WHEN PROJECT IS ADDED TO CWP
:=t~ONG Drsf;:jijj[
FUN' )@~fii: sURF:icE 'l'NWJf6k4:
FEDERAL JtIGHWAY ADMIN 'lrtlNbS 522:agfts AN AssocfATED
PE ROW CONST
$
371
AFTER 97.
AFTER 97
BULLOCH 522470
STATUS:
SR 26/US 80 EB MP 7.1-8.2;, WB MP 8.1-9.3 ADDITION OF A PASSING LANE. PROJECT MILEAGE: 2.30 MANAGER: PETE BLOCKER BULLOCH SGN/UTILITIES 12-l 7-9l;PORTAL' SGN 12-5-91 PUB UTILS
::1I1:1~i~G DIST. 1.
R~: i~~~
. ;a;; ---.. --..
:":. .... ..
- ...-::::::::\CONST
SOURCt,f Jbi&AcE TRANSP;;;;:
FEDE-:R-:-:,.A:,:-.-L:-::-:.;-:1,..i.!G:-:.:k.;-.W-:.:- AY ADMIN
UNDERWAY
$
93
AFTER 97
BULLOCH 522740
STATUS:
SR 26 AT ZETTERTOWER/STOCKYARD
TURN LANES/ SAFETY
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE
BULLOCH SIGNED 12-10-93 ROW AND UTILITIES
OTO
CONG DIST. \1
FUND SOURCE: NAT~ii1d~!~y
FEDERAL HIGHWAY AfiMIN FUNDS
PE 1994
UNDERWAY
ROW LOCL
CONST 1996
$
156
FED SHARE$
156
GA. SHARE$
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 6
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P. I. NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-----------------------------------------------------------------------------------------------------------------------------------
BULLOCH OLD SR 46@ LITTLE LOTTS CK 11 MI
PE 1993
UNDERWAY
531270 REPLACEMENT OF THE EXISTING BRIDGES(S).
CONG DIST. 1
ROW LOCL
PROJECT MILEAGE : .00
CONST 1995
$- 575
MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
460
STATUS: REQ BULLOCH DO ROW AND UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
115
0TH SHARE $
BULLOCH 541950
STATUS;
SR 46 OVER LUKE SWAMP BRANCH REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: SEND LGPA IN 1995
CONG DIST. l
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW 1996
$
1
CONST 1997
$
320
FED SHARE $
256
GA. SHARE $
64
0TH SHARE $
BULLOCH 550500
STATUS:
BRANNEN ST/GENTILLY RECONSTRUCTibN & PROJECT MILEAGE : 1.47 MANAGER: PETE BLOCKER STATESBORO SGN 4-1-91 ROW
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW LOCL
CONST 1997
$
847
FED SHARE $
678
GA. SHARE $
169
0TH SHARE $
BULLOCH 571010
STATUS:
STATESBORO GREENWAYS; LANDSCAPING. BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: KEITH GOLDEN LGPA TO BE DONE BY CONTRACT
DIST. 1
SOURCE: TRANS: ENHANCE. HIGHWAY ADMIN FUNDS
PE LOCL
ROW 1995
$
200
CONST 1995
$
175
FED SHARE $
140
GA. SHARE $
40
0TH SHARE $
75
BULLOCH 5Bl519
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPitNT: BULLOCH COUNTY MANAGER: STEVE KISH NOT APPLICABLE
:iB&Mft: FFUENDDERAidrRANsRITURiAiLliijTI~RAtoN'Nsio4s?
'::: ..OPERATING 1995
$
FED SHARE$
GA. SHARE$
44 26
0TH SHARE$
18
BULLOCH 5Bl520
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH NOT APPLICAB:tE
:JH:ipNG DIST.
;~b :?<:::::::::::::::OPERATING 19 9 6
$
SOURctt::iahL TRANSIT
FED SHARE$
46 27
FEDE;AAI,. ,J.'~$lT ADMIN
GA. SHARE$
0TH SHARE. $
19
BULLOCH 5C251~
STATUS:
TWO CONVERSION VANS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH NOT APPLICABLE .
CONG DIST >'=1 FUND SOURCE: RuRAflMNsIT
FEDERAL TRANSIT ADMfif FUNDS
CAPITAL 1995
$
58
FED SHARE$
46
GA. SHARE$
6
0TH SHARE $-
6
.
llmllm
~
111!!!!!:!!m
~
~
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CAMDEN 511070
STATUS:
I-95 FM FLA LINE TO HARRIETTS BLUFF RECONSTRUCTION & WIDENING FROM 4 LANES PROJECT MILEAGE : 7.22 MANAGER: J. GRAYBEAL DOT PAY CAMDEN UTIL 1-19-94;
RVR CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y070 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 7
FISCAL YEAR.
COST ESTS
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1996
$ 21500
FED SHARE $ 17200
GA. SHARE $ 4300
0TH SHARE $
CAMDEN 511075
STATUS:
I-95@ ST MARY'S RIVER@ FLA BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .51 MANAGER: J. GRAYBEAL CAMDEN SGN UTIL 2/92;
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y075 IS AN ASSOCIATED PROJECT.
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1996
$ 6602
FED SHARE $ 5282
GA. SHARE $ 1981
0TH SHARE $ 3301
CAMDEN 511080
STATUS:
I-95 FM HARRIETT'S RECONSTRUCTION & PROJECT MILEAGE : 6.72 MANAGER: J. GRAYBEAL CAMDEN COUNTY SGN 2-4-92
SR 25 SPUR 4 LANES TO
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y080 IS AN ASSOCIATED PROJECT.
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1996
$ 17098
FED SHARE $ 13678
GA. SHARE $ 3420
0TH SHARE $
CAMDEN 511082
STATUS:
I-95 FM SR 25 SPUR TO CR 138/INCL BRIDGES_ RECONSTRUCTION & WIDENING FROM 4 LANES TO PROJECT MILEAGE : 8.44 MANAGER: J. GRAYBEAL CAMDEN SGN 3-24-92 - UTILITIES
CAMDEN 511084
STATUS:
I-95 FM CR 1~8 TO US 17/GLYNN & BR@ L
RECONSTRUCTION & WIDENING FROM 4 LANES
PROJECT MILEAGE : -6. 76
MANAGER: J. GRAY.BEAL REQ GLYNN DO UTIL 3-2-92; CAMDEN SGN 3-24-92 UTIL.
CAMDEN 51Y070
STATUS:
I-95 FM FLA LINE TO HARRIETTS BLUFF RD/INCL BR@ CROOKED RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 7.22 MANAGER: UNKNOWN DOT PAY CAMDEN UTIL 1-19-94; KINGSLAND REFUSED 7-6-93
DIST. 1
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS S.f.-..Y..0...82'\t-S..::.. AN ASSOCIATED PROJECT.
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1995
$ 31055
FED SHARE $ 24844
GA. SHARE $ 6211
0TH SHARE $
/~:~~S~~~~:[!~i,P i BATS93-ll
PE 1996
$
ROW NONE
$
CONST 1996
$
FUND:$9~?t: NAT'.L _HIGliffifj//
FED SHARE$
FEDERAL:JUGHWAY ADMINC::FUNDS
::::/\
Slt084)is -:::=::: .:::-
AN ASSOC!.A....T.ii.iif :pfoJECT. /
GA. SHARE$ 0TH SHARE$
231 0
21805 17444
4361
FUND souRcif:'iJt:;~TE MAINT
FEDERAL.-..iifdft#.fi.y ADMIN FUNDS/
511010: is :iuf ASSOCIATED PRddi!:cf{?:
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1995
$ 4000
FED SHARE $ 3600
GA. SHARE $
400
0TH SHARE $
CAMDEN 51Y075
STATUS:
I-95@ ST. MARY'S RV@ FLA STATE LINE; FOR IM$; SEE 511075 UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MA!-{AGER: UNKNOWN
CONG DIST :'''\1
FUND SOURCE: I-STATE\AAINT. FEDERAL HIGHWAY AriMtNFUNDS 511075 IS AN ASS6Ct.ATED PROJECT.
PE NONE
$
ROW NONE
$
CONST 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 1640 1476
656 820
COUNTY P.I.NO.
DESCRIPTION PROJECT DATK.
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CAMDEN 51Y080
STATUS:
I-95 FM HARRIETT'S BLUFF RD TO SR 25 SPUR
RECONSTRUCTION & WIDENING FROM 4 LANES T:c. 6 LANES.
PROJECT MILEAGE : 6.72
MANAGER: UNKNOWN
CAMDEN COUNTY SGN 2-4-92 FOR
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511080 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 8
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1995
$ 3000
FED SHARE $ 2700
GA. SHARE $
300
0TH SHARE $
CAMDEN 51Y082
STATUS:
I-95 FM SR 25 SPUR TO CR 138/ING.jgfiB8k's
RECONSTRUCTION & WIDENING FR0!1_: 4= ~ES TO
PROJECT MILEAGE : 8.44
MANAGER: UNKNOWN
CAMDEN SGN 3-24-92
CAMDEN 51Y084
STATUS:
I-95 FM CR 1:38 TO US fi/q:tYNN. & BR @ L SATILLA Rvii]Jhm
RECONSTRUCTION & WIDENING' FROM 4 LANES TO 6 LANES{): . PROJECT MILEAGE : 6,76 MANAGER: UNI<l'IOWN REQ GLYNN DO UTIL 3-2-92;
CONG DIST, 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511082 IS AN ASSOCIATED PROJECT.
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511084 IS AN ASSOCIATED PROJECT.
PE 1993
UNDERWAY
ROW NONE $
0
CONST 1995
$ 8000
FED SHARE $ 7200
GA. SHARE $
800
0TH SHARE $
PE 1996 $
ROW NONE $
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
_o
0 4000 3600
400
CAMDEN 522690
SR 25/US 17 BRIDGE OVER ST. MARY'S RIVER /FLA STATF:\~ijjf\: '\( .
REPLACEMENT :bF THE EXISTING BRIDGES (S) , NO ADDED ijE'::i#/'
::::~ONG DIST. 1
PROJECT MILEAGE : . 00
....
STATUS: =~:R~o~NT~E~~;~:D TO COMMIT ANY FUNoi~q;=:ib~~:~1~,;
~~:~~u!i:~w!~I::I!R~~~
PE 1994
UNDERWAY
ROW 1995 $
5
CONST 1995
$ 3050
FED SHARE $ 2440
GA. SHARE $
610
0TH SHARE $
CAMDEN532480
STATUS:
SR 40 @ CR 81 AND I-95 SB ON/OFF RAMPS IN KINGStJlliD.
INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE: .14 - EXIST. LANES: 6 /PROPOSED
MANAGER: PETE BLOCKER
KINGSLAND SGN 10-5-92 FOR UTILITIES
T&S
SAFETY ADijp~:@j.iijps.
PE NONE
$
0
ROW LOCL
CONST 1995 $ 275
FED SHARE $ 248
GA. SHARE $
28
0TH SHARE $
CAMDEN 571000
STATUS:
A STUDY OF BIKE/PEDESTRIAN PATHS IN COASTAL GEORGIA PRELIMINARY tNGINEERING / ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STAN HAMES LGPA TO BE DONE BY CONTRACT
\ilil:foNG DIST. 1 ..:t
F'ffub sou~qt:lf~s. ENHANCE.
FEP~~- ~I:O~I'iAY ADMIN
PE 1995
$
125
ROW NONE
$
0
)CONST NONE
$
0
CAMDEN 571040
STATUS:
KINGSLAND DOWNTOWN 6 BLOCK AREA AND LANDSCAPE SIDEWALKS/ ENHANCEMENT PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STAN HAMES LGPA TO BE DONE BY CONTRACT
CONG- DIS;=:>1 FUND SOURCE: TRAN#)='NHANCE.
FEDERAL HIGHWAY AP~P~ FUNDS
PE LOCL
. ROW NONE
$
0
CONST 1997
$
365
FED SHARE $
292
GA. SHARE $
0TH SHARE $
73
Ellmlffl
~
~ ,,
~
i~
COUNTY P,I,NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM.
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CAMDEN 571050
STATUS:
WOODBINE WATERFRONT BOARDWALK, BICYCLE/PED, FACILITY/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: MANAGER: STAN HAMES LGPA TO BE DONE BY CONTRACT
LANDSCAPING
0
CONG DIST, 1
FUND SOURCE: TRANS, ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 9
FISCAL YEAR
COST ESTS
PE 1995 $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$ 0TH SHARE$
59
0
609 487
12 134"
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CHARLTON SR 852/FOLKSTON FM CR 138 NE 521900 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE: .87 MANAGER: PETE BLOCKER STATUS: CITY OF FOLKSTON SIGNED 1/5/90
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CHARLTON SR 40 E/FOLKSTON: l)EB MP 1. 522350 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 2.85 MANAGER: PETE BLOCKER STATUS: SEND LGPA IN 1994
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CHARLTON SR 94@ ST MARYS 531300 REPLACEMENT OF THE
PROJECT MILEAGE: 1.00 MANAGER: PETE BLOCKER STATUS: AGREEMENT SENT TO FLORIDA
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 10
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1992
UNDERWAY
CONST 1995
$ 2118
FED SHARE $ 1694
GA. SHARE $
424
0TH SHARE $
PE 1992
UNDERWAY
ROW 1995
$
13
CONST 1996
$
712
FED SHARE $
570
GA. SHARE $
142
0TH SHARE $
PE 1993 UNDERWAY
ROW 1996
$
2
CONST 1997
$ 2742
FED SHARE $ 2194
GA. SHARE $
823
0TH SHARE $ 1371
., -
IE!l.'!l:ll
~
~
~
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 11
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P. I .NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
----------------------------------------------L-----------------------------------------------------------------------------------
CHATHAM I-95 TRUCK RAMP & WEIGH STATION JUST SOtJTH/ SC LINE & 51Y010
SAVANNAH TIP lt 94-H-3
PE 1994 UNDERWAY
511010 WEIGH STATION / RECST. OR REHAB.
;:;:::;._
CONG DIST. 1
ROW 1995
$
161
PROJECT MILEAGE : .38 - EXIST. LANES: 0 )#R(?POSED LANES: 0
CONST 1995
$ 3212
MANAGER: J. GARLAND (C)
FUND SOURCE: NAT'L HIGHWAY
FED SHARE$ 2570
STATUS: LGPA NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
642
51Y010 IS AN ASSOCIATED PROJEC.T.
0TH SHARE $
::;~~~~~~E,G~E~ CHATHAM I-95@ CR 984/JIMMY DELOACH PKWY
}\
511060
i~~~T~Ui~i~~iii~;: 0 /PROPOSED:l~ES: 0
. MANAGER: D. CHURCH (M)
.-:::/;;:';:;/:::': \t
STATUS: REQ COUNTY DO ROW AND UTIL1TIES:: ~-16-93
SAVANNAH TIP f 91-H-8
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW LOCL
CONST 1997
$ 8305
FED SHARE$ 6644
GA. SHARE$ 1661
0TH SHARE$
CHATHAM 511180
STATUS:
I-16 AT MP 165.1, 164}~/)'.63.2, 162.3, AND
BRIDGES / RECST. OR RE.8.1\B(
PROJECT MILEAGE : . 00 - .....
ADDED MANAGER: NEIL DAVIS
( ] \..
SEND LGPA WHEN PROJECT rs
SAVANNAH TIP f 94-H-2 CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW NONE CONST
$
110
$
0
AFTER 97
CHATHAM 51Y010
STATUS:
I-95 TRUCK RAMP AND WEIGH STAT.;
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: UNKNOWN
CHATHAM 521495
STATUS:
SR 204/ABERCORN ST@ SOUTHWEST BYP INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANEs=:Q/=}
MANAGER: G. ROSS (M) CHATHAM COUNTY SGN FOR ROW & UTILITIES 4-24-92.
DIST. 1
FUND SOURCE: I-STATE MAINT.
_ FEDERA,L HIGHWAY ADMIN FUNDS
: s i i d f o \ l s -:
-:;:::::..AN ASSOCIATED PROJECT.
i:\;!~~~'.Jii~t i 91-H-14
FON~:,~gi'.i: SURFACE TRANilBi{!r:
FEQt~ 11rGHWAY ADMrn,filifos
CHATHAM 521770
STATUS:
:<::::::::/:}:::Jr:t{.. . ...
SR 26 FM BRY.ltNWOOD RD TOW/BULL RIV INCLD BIKE LANE & BRIDGE
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.94
.
MANAGER: G. ROSS (M)
COUNTY SGN OTIL & PAY 20% MATCHING FONDS BIKE PATH 6-26-92.
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
350
FED SHARE $
315
GA. SHARE $
35
0TH SHARE $
PE 1992
UNDERWAY
ROW LOCL
CONST 1997
$ 7297
FED SHARE $ 5838
GA. SHARE $ 1459
0TH SHARE $
1992 1996
UNDERWAY $ 200 AFTER 97
CHATHAM 521780
STATUS:
SR 26/GARDEN CITY FM CR 704 TO SR 25/0S 17;INCL CLVT EXT TORN LANES/ RECST. OR REHAB. PROJECT MILEAGE : .70 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D. SMITH GARDEN CITY SGN 1-25-93 UTIL; COUNTY HAS NO UTIL INVOLVED.
SAVANNAH q,IP CONG DIST .::,1
FUND SOURCE: HWY .::{~if.ii:;
FEDERAL HIGHWAY A!iM!N FONDS
PE 1992 UNDERWAY
ROW 1995
$
100
CONST 1995
$
826
FED SHARE $
743
GA. SHARE $
83
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 12
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL.
COST
-P--. -I.-N-O--. ----------------PRO-J-E-C-T--D-A-T-A----------------------------------------------CO-M--M-E-N-T-S------------------------
CHATHAM SR 26 FM 4-LN E/LYNES PKWY TO VICTORY DR/CS 188
SAVANNAH TIP i 87-H-18b
YEAR
,----
--------E-S-T-S --
PE 1993 -UNDERWAY
521855 RECONSTRUCTION & WIDENING FROM 2 LANES T0>4 LANES.
CONG DIST. 11 .
ROW LOCL
PROJECT MILEAGE: 1.38
CONST 1996
$ 5620
~~~:: {gi: STATUS:
1
S~Gf'l:~sil-30-90: ROW, UTILITIES/ti
CONSTRUCTION.
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
FED SHARE$ 4496 GA. SHARE$ 1686
0TH SHARE$ 2810
CHATHAM SR 25 FM 4-LN N/SR 204 NE TO sR,dOilit:iCL PARALLEr/ij~IDGE)
~f~::r:;~~:~lt:: 521860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
STATUS:
& u&~i]~~:}:0-16-90 (1% TAX i#9JECT)
CHATHAM 521867
STATUS:
t SR 2 5 /US 1 7 /OCEAN :~='@fPGEECHEE RIVER OVERFLOW :-: f
J REHAB. OF THE EXISTING BRIPGE{S). FROM 2 LANES TO ill&Es.
PROJECT MILEAGE : .00
MANAGER: G. ROSS (C)
-.::--::-.-.
CHATHAM COUNTY SIGNED 11/9/90 FbR
SAVANNAH TIP i 90-H-6
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP i ~O-H-7
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521865-IS AN ASSOCIATED PRO.:JECT.
PE 1992
UNDERWAY
ROW LOCL
CONST 1997
$ 5976
FED SHARE$ 4781
GA. SHARE$ 1195
0TH SHARE$
PE 1992
UNDERWAY
ROW LOCL
CONST 1996
$
445
FED SHARE$
356
GA. SHARE$
89
0TH SHARE$
CHATHAM 522490
STATUS:
SR 26/US80 FM W OF BULL RIVER TO RECONSTRUCTION & WIDENING FROM.2 PROJECT MILEAGE : 5.77 MANAGER: G. ROSS {M) SEND LGPA IN 1997
CHATHAM 522610
STATUS:
SR-25/US-17 OVER THE SAVANNAH RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : ,00 MANAGER: D. CHURCH (M) SEND LGPA IN 1996
i 93-H-3
SOURCE: SURFACE TRANSPORT. HIGHWAY ADMIN FUNDS
J:f~. SAVANNAH
i 90-H-6
:coNG Disd\1
FUND)SbffifoE: BRIDGE PRO~~ /:
FEDEkAi/db:GHWAY Ari~1c~ fbNi:>S
PE 1995 ROW 1997 CONST
$
602
$
559
AFTER 97
PE 1996 ROW CONST
$ 150 AFTER 97 AFTER 97
CHATHAM 522670
STATUS:
RE-ROUTINGS~ 25/US 17 IN PORT WENTWORTH TO SR 30 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .94 MANAGER: PETE BLOCKER SEND LGPA IN 1996
(~ji#9f
iUNo souRdfLsHfu.AcE TRANsPoIH
FEDERAL ,Atd:k#Ky ADMIN FUNDS .:{ }
PE 1995
ROW 1997 :-:-:=:::::=\tONST
$
15
$
91
AFTER 97
CHATHAM 52Y770
STATUS:
SR 26 FM BRYANWOOD RD TO BULL RIV (SHOWN FOR BIKE FUNDS 33B) BICYCLE/PED. FACILITY/ RECST. OR REHAB. PROJECT MILEAGE: 1.94 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: G. BOULINEAU
SAVANNAH,.TIP CONG DIST .\1
ADMIN FUND SOURCE: TRANs):fiHulliCE.
FEDERAL HIGHWAY
FUNDS
521770 IS AN ASSOCIATED PROJECT.
PE NONE ROW 1996 CONST
$
0
$
0
AFTER 97
Emmi
..
c==i tam== ~
;.,'\.,," .....,....,.
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CHATHAM 531260
STATUS:
SR 204 EB FM MP 2.0-3.2;WB MP 3.7-4.7 Sl!:,,OF MELDRIM ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.20 MANAGER: PET-E BLOCKER
CHATHAM SGN 10-11-91 FOR UTILITIES.
SAVANNAH TIP i 92-H-7
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 532510
STATUS:
SR 204/ABERCORN ST. @ EISHENHOWEibN SAVANNAH
INTERSECTION IMPROVEMENT / SAF:EiT'i{f:('>
\/:
PROJECT MILEAGE : . 21 - EXIST% tirnii:s: 7 /PROPOSED dW~s: 8
MANAGER: PETE BLOCKER
.,,,,:,, i::,_,_: --
SAVANNAH SGN FOR UTILITIE$)J:ff4"'93;COUNTY
SAVANNAH TIP lt 94-H-5 CONG DIST. 1
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
i!l!t~: CHATHAM
541900
:SR:~2~5~~AcL~T~/U~S~A1~7~@P~GO~~~lM E~:T@~;~iI~NrESA~VEASN:NAH4 /PROPosiB!1
5
MANAGER: PETE BLOCKER - :::,{
STATUS: REQ CITY OF SAVANNAH DO Row ::t
SAVANNAH TIP lt 93-H-1 CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CHATHAM 550550
STATUS:
DIAMOND CSWY FM FERGUSON AVE TO MCWHORTER DR
./ ::,,::,,c:::c:::;:::
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES./}
PROJECT MILEAGE: 3.20
MANAGER: G. ROSS
CHATHAM SGN 11-20-92 FOR UTILITIES; SAVANNA--H: .
\}],AVANNAH TIP i 92-H-3 ):\ }~ONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FED~.HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 13
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1995
$
14
CONST 1996
$
660
FED SHARE $
528
GA. SHARE $
132
0TH SHARE $
PE NONE
$
0
ROW 1994
$
300
CONST 1995
$
228
FED SHARE $
205
GA. SHARE $
23
0TH SHARE $
PE NONE
$
0
ROW LOCL
CONST 1995 $
350
FED SHARE $
315
GA. SHARE $
35
0TH SHARE $
_PE 1993 ROW 1997 CONST
UNDERWAY $ 1810 AFTER 97
CHATHAM 550570
STATUS:
MIDDLEGROUND & MONTGOMERY CROSS RDS FM ABERCOR~::,:,~O ABRCRN EX-.-.-RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2.80 MANAGER: G. ROSS CT REQ COUNTY PROVIDE DESIGN, DO ROW, UTIL % 20% CST
SURFACE Tilikifokf~
ABMrnJiti~os
PE LOCL ROW LOCL CONST 1997 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
3500 2800
700
CHATHAM 550580
STATUS:
WHITE BLUFF/COFFEE BLUFF RD FM LITTLE OGEECHEE RVR TO WILLOW RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.10 MANAGER: G. ROSS SEND LGPA IN 199
w;JJ;; SOURcklfitikFAcE TRANSPokf:f FEDERAL -HfoHWAY ADMIN
PE LOCL
ROW LOCL
::::::::.:::tONST 1997
$
FED SHARE$
GA. SHARE$
0TH SHARE$
9000 '7200 1800
CHATHAM 570830
STATUS:
SURVEILLANCE AND MONITORING SYSTEM IN SAVANNAH CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. PROJECT MILEAGE : .00 MANAGER: BURTRIDDLE CONTACT TRAFFIC OPERATIONS
SAVANNAH,f!P i 94-H-6
CONG DIST .":11
-
fl~:f=; FUND SOURCE : HWY.,:
FEDERAL HIGHWAY ADMi~ FUNDS
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1995
$
578
FED SHARE $
520
GA. SHARE $
58
0TH SHARE $
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CHATHAM 570850
STATUS:
MCQUEENS ISLAND ABANDONED RAILROAD MULT:rJ?URPOSE TRA.IL
!~;~~~/~~~EA~~C~L~~~ ~ :~~~~E~is: 0 /trtoPOSED LANES: 0
MANAGER: KEITH GOLDEN
TO BE DONE BY ~ONTRACT.
SAVANNAH TIP t 94-H-8
CONG DIST. 1 & 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 14
FISCAL YEAR
COST ESTS
PE LOCL
ROW LOCL
CONST 1995
$
440
FED SHARE$
352
GA. SHARE$
0TH SHARE$
88
CHATHAM 570860
STATUS:
EXT. OF R. MCCORKLE SR BIKEWAY ONi(ifUif;GTON ISLJilit}>
BICYCLE/PED. FACILITY / ENHANCEMENif /
:
PROJECT MILEAGE : .oo - EXISTdLAN'ES: o /PROPOSED Jffiis: o
MANAGER: KEITH GOLDEN
TO BE DONE BY CONTRACT.
SAVANNAH TIP t 94-H-9
CONG DIST. 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996
$
110
FED SHARE$
88
GA. SHARE$
0TH SHARE$
22
CHATHAM 570870
STATUS:
VISITOR CENT~R REHABrt~iAfioN
.
MISCELLANEOUS IMPROVEMEN.TS.:. / ENHANCEMENT
}
PROJECT MILEAGE : .oo - txisT. LANES: o /PRoPostffi
MANAGER: KEITH GOLDEN
. . ..
TO BE DONE BY CONTRACT
SAVANNAH TIP t 94-H-7
CONG DIST. 1 & 11
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE $ 0TH SHARE$
1000 800
200
CHATHAM 570875
STATUS:
LANDSCAPING AT VARIOUS LOCATIONS IN SAVANNAH
LANDSCAPING/ ENHANCEMENT
.
PROJECT MILEAGE : .00 - EXIST.
MANAGER: KEITH GOLDEN
TO BE DONE BY CONTRACT
DIST. 1 & 11
SOURCE: TRANS. ENHANCE. ADMIN FUNDS-
CHATHAM 570880
STATUS:
OLYMPIC LANDSCAPING IN SAVANNAH, 1994
SAVANNAH &~, t 94-H-4
LANDSCAPING / ENHANCEMENT
:()'),:cONG DIS'ih)ll & 1
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 ./PROPOSED LANES:f :o:r::::::::::=:>. :::\\\}::-:
MANAGER: E. LAWS NOT APPLICABLE
FUND)SOtfficE: NAT'L HIGHwi'i?>
FEoEilitib:GHWAY Abiji:N/ti:m'os
PE LOCL ROW LOCL CONST 1995 $
FED SHARE$
GA. SHARE $ 0TH SHARE$
1450 1160
290
PE 1994 UNDERWAY'
ROW LOCL
CONST 1995
$
625
FED SHARE$
500
GA. SHARE$ 125
0TH SHARE$
CHATHAM OLYMPIC LANDSCAPING IN SAVANNAH, 1995 570890 LANDSCAP ING / ENHANCEMENT . - .
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E. LAWS STATUS: NOT APPLICABLE
CHATHAM 570900
STATUS:
OLYMPIC LANDSCAPING IN SAVANNAH, 1996 LANDS CAP ING / ENHANCEMENT . PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: E. LAWS NOT APPLICABLE
::::./AVANNAH TIP ::~~f;ijj'4
:/:::\CONG DIST. 11:i&?'F,:"'
;rn~; SOURctfl:j}:f~ L HIGHWAY
FEDE:RAL itlGii#AY ADMIN FUNDS /:
-:::::{;j;lffllli=:==
.. ::::!:~:i:i:!:l:(:!:::(:!:1:;::::
~~~~i:~,,i ., 1
91-H-4,.,:::!l:l
:'r::
FUND SOURCE: NAT't'.kih~:AY
FEDERAL HIGHWAY A,OM:j)f FUNDS
PE 1995
$
ROW LOCL
;:;;:,/CONST 1995. $
FED SHARE $
GA. SHARE $
0TH SHARE $
25
1094 875 219
PE 1996 $ ... 25
ROW LOCL
CONST 1996
$ 1094
FED SHARE $
875
GA. SHARE $
219
0TH SHARE $
Wllill:!mJ
~
~
~
~
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994
Page 15
I
FISCAL YEAR
COST ESTS
CHATHAM 571110
STATUS:
OLYMPIC SIGNAL SYSTEM IN SAVANNAH
SIGNALS/ SAFETY PROJECT MILEAGE : .00 - EXIST. MANAGER: BURT RIDDLE CONTACT TRAFFIC OPERATIONS
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995
$
ROW NONE $
CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
50
0 2000 1600
400
CHATHAM 5D5011
STATUS:
CAP. MAINT., VEHICLES,
-:irr:ctrr~ TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: CHATHAM MANAGER: STEVE KISH LGPA NOT APPLICABLE
CHATHAM 5D5012
STATUS:
CAP. MAINT , "--".,u..rr,,.T,._
TRANSIT PROJECTS FUNDS RECIPIENT: CHATHAM MANAGER: STEVE KISH -LGPA NOT APPtICABLE
ETC
CONG DIST. 1 & 11
CAPITAL 1995
$
340
FUND SOURCE: URBAN TRANSIT
FED SHARE $ 272
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
34
0TH SHARE $
34
CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CAPITAL 1996
$
370
FED SHARE $ 296
GA. SHARE $
37
0TH SHARE $
37
CHATHAM 5D5015
STATUS:
PUBLIC TRANSIT SERVICE FOR SAVANNAH AND CHATHAM TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STE-i.JE KISH LGPA NOT APPLICABLE-
DIST. 1 & 11
SOURCE: URBAN TRANSIT ADMIN FUNDS
OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
4536 907
907 4536
GHATHAM 5D5016
STATUS:
PUBLIC TRANSlT SERVICE FOR SAVANNAH AND TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: CHATHAM AREA TRANSIT. SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE
i\<::QNG Disdd) & 11
FUNo::~a&~bi: URB~. _T~*-Pf/=' : :..OPERATIN~E~ 9::ARE :
FEQ~TRANSIT ADMIN{~ONDS
GA. SHARE $
0TH SHARE$
4266 896 896
4266
CHATHAM 5H0025
STATUS:
AREA 13A DIKE CONSTRUCTION DMCA/DIKE WORK/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 ~AGER: LUKE COUSINS NOT APPLICABLE
PE NONE $ ROW NONE $
1995 $ FED SHARE $ GA. SHARE $ 0TH SHARE $
0 0 4000
4000
CHATHAM 5H0030
STATUS:
JONES OYSTER BED DIKE CONSTRUCTION DMCA/DIKE WORK/ NEW CONSTRUCTION PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE COUSINS NOT APPLICABLE
FUND SOURCE:
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $ GA. SHARE $ 0TH SHARE $
0 0 3750
3750
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 16
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O-.----------------P-R-O-J-E-C-T--D-A-T-A----------.-. -----------------------------------C-O-M-M-' -EN-T-S---------------------------Y-E-A-R---------E-S-T-S--
CHATHAM AREA 14A DIKE CONSTRUCTION .
PE NONE
$
0
5H0035
DMCA/DIKE WORK/ NEW CONSTRUCTION PROJECT MILEAGE: .00 - EXIST. LANES:
0
/~OPOSED
LANES:
0
CONG DIST. 1
ROW NONE CONST 1995
$
0
$ 1000
MANAGER: LUKE COUSINS
FUND SOURCE: STATE HARBOR FUNDS
FED, SHARE $
STATUS: NOT APPLICABLE
GA. SHARE $ 1000
0TH SHARE $
CHATHAM DIKE SLOPE EROSION PROTECTION ...:::=:::::=::::::::::;:;::
i!tt .
580040 - DMCA/DIKE WORK / NEW CONSTRUC';r:{QW(/ :/
\ /:
PROJECT MILEAGE : 00 - EXIS.T{ LANE$: 0 /PROPOSED ilm1s: 0
MANAGER: LUKE COUSINS
STATUS: NOT APPLICABLE
CONG DIST. 1 FUND SOURCE: STATE HARBOR FUNDS
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 4500
4500
CHATHAM CHATHAM COUNTY HARBOR:MAlNTENANCE 5H0045 DMCA/DIKE WORK/ MAINTEN~CE
PROJECT MILEAGE : .oo - EX:[ST. LANES: 0 /PROPos.iBmis: 0
MANAGER: LUKE COUSINS
STATUS:_ NOT APPLICABLE
CONG DIST. 1 FUND SOURCE: STATE HARBOR FUNDS
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
980
FED SHARE $
GA. SHARE $
980
0TH SHARE $
CHATHAM 5V1011
STATUS:
ELDERLY AND DISABLED VEHICLES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH
DIST. 1 & 11
CAPITAL 1995
$
56
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
45
FEDERAL TRANSIT ADMIN FUNDS '.,
GA. SHARE$
5
0TH SHARE $.
6
CHATHAM 5Vl012
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPI!NT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH
DI_~)!] & 11
oiMrnitJ FUNri'.'::Jd~&f: ELDERLY &
1996
$
~:~TAL FED SHARE$
58 46
FEDitmdrRANsIT -AriMIN ftfilos
GA. SHARE$
6
0TH SHARE$
6
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
EFFINGHA I-16 WIDEN 10 BRIDGES @ MP 138.3; 145. 51119X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 MANAGER: STATUS:
147.2/BRYAN
CONG DIST. 1 ,
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS -
EFFINGHA CR 307@ EBENEZER CREEK 532390 BRIDGES/ REPLACEMENT
PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER STATUS: EFFINGHAM COUNTY SGN DO
CONG DIST. l & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS,
22-Feb-1994 Page 17
FISCAL YEAR
COST ESTS
PE 1994 UNDERWAY
ROW NONE $
0
CONST 1997
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1993 UNDERWAY
ROW LOCL
CONST 1997
$
126
FED SHARE$ 101
GA. SHARE$
25
0TH SHARE$
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
EVANS 522005
STATUS:
SR 73/0S 301 FM TATTNALL CO LINE TO S
RECONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE: 6.75
.
MANAGER: PETE BLOCKER
REQ TATTNALL P OTL 9/91;SGN EVANS
7/93 P.O
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FONDS
22-Feb-1994 Page 18
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW 1995
$
200
CONST 1997
$ 5705
FED SHARE $ 4564
GA. SHARE $ 1141
0TH SHARE $
liEZlmaJ
~
~
1-.
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GLYNN 511095
STATUS:
o,a I-95 FM US 17 /SR 520 S/BRUNSWICK TO US 341 PHASE II
RECONSTRUCTION & WIDENING FROM 6 LANES
LANES.
PROJECT MILEAGE : 6.68
MANAGER: M. REYNOLDS
SEND LGPA WHEN PROJECT IS ADDED
BRUNSWICK TIP i
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 19
FISCAL YEAR
COST ESTS
PE ROW NONE CONST
$
250
$
0
AFTER 97
GLYNN 511102
STATUS:
I-95@ ALTAMAHA RIVER & BRIDGES/ REPLACEMENT PROJECT MILEAGE : . 00
=A~~~~NMco:~O~D!cINTOsJiig!t: D0 UTILITIES
GLYNN 511105
STATUS:
~!Mfffi,flE I-95 FM US 341 TO ALTAMAHJ\: RIVER@ MCINTOSH
RECONSTRUCTION & WIDENiN<fFROM 6 LANES TO 8
II
PROJECT MILEAGE : 8.66
MANAGER: M. REYNOLDS
SEND LGPA WHEN PROJECT IS
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 51Y102 IS AN ASSOCIATED PROJECT.
BRUNSWICK TIP i
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN-FUNDS
PE 1995
$
ROW NONE
$
CONST 1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
300 0
15000 13500
1500
PE ROW NONE CONST
$
250
$
0
AFTER 97
GLYNN 520890
STATUS:
SR 25/BRUNSWICK FM S OF TORRAS RECONSTRUCTION & WIDENING FROM PROJECT MILEAGE : 1.97 MANAGER: D. CHURCH {C) BRUNSWICK SIGNED 2/22/89 UTILITIES
GLYNN 521350
STATUS:
SR 520/US 17 FM I-95 TO JEKYLL ISLAND CAUSEWAY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.50 MANAGER: PETE BLOCKER REQ GLYNN DO UTIL 3/91; 9-13-92 LETTER-NO UTIL COST
GLYNN 521355
STATUS:
SR 520/US 17@ FANCY BLUFF CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .00
MANAGER: PETE BLOCKER NO UTILITY REIMBURSEMENTS ON. THIS PROJECT 1-6-94
GLYNN 522040
STATUS:
SR 25/BRUNSWICK-ROADWAY & APPROACH WORK TO SIDNEY LANIER BR BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: J. GRAYBEAL REQ CO BE RESPONSIBLE FOR SAFETY/MAINTENANCE OF OLD BR 8/93
FUND SOURCE: NAT'L HIGHWAY ::F::::E:::_D:rERA.L... HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW 1995
$ 1815
CONST 1996
$ 4048
FED SHARE $ 3238
GA. SHARE $
810
0TH SHARE $
BRUNSWICK::;iP f BATS93-03
PE 1992
UNDERWAY
{CONG Dis~{jJ
ROW NONE
$
0
~~~ml~'!~w:~Ti$k~!;:IT!~~>- .}), CONST 1995
$
FED SHARE $
GA. SHARE $
4325 3460
865
521'.355 ?is AN ASSOCIATED(~ROJECT . .}C
0TH SHARE $
PE 1991
UNDERWAY
ROW NONE
$
0
.FtiND SOURct't!ikioGE PROGRAM '
:e:;:}:\CONST 1995
$ 2100
FED SHARE $ 1680
~~~j~d~J'!~s~~i~E~~~tj~~f ]C{i
GA. SHARE $
420
0TH SHARE $
BRUNSWicid'.l'IP t BATS93A6Y
CONG DIST. ?1
... .. .
FUND SOURCE: STAT2f&t6~
FEDERAL HIGHWAY Jffi~fN FUNDS
PE 1992
UNDERWAY
ROW 1995
$
100
CONST 1995
$ 16600
FED SHARE $ 8300
GA. SHARE $
0TH SHARE $ 8300
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GLYNN 522045
STATUS:
SR 25/BRUNSWICK.MAIN SPAN OF BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: J. GRAYBEAL NOT APPLICABLE .
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJEC:T LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
& 52Y045
BRUNSWICK TIP f BATS93-01
CONG DIST. 1
.
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
GLYNN 522310
STATUS:
SR 27@ I-95 FM W/CRISPEN BLVD/c:i~l~:fo W/YELLow\ituFF CRK
RECONSTRUCTION & WIDENING FROM)s::fJilits TO 6 LANES.
PROJECT MILEAGE : . 87
.. . "''='='='=""
~1: :~t~!~~s!i~~ ~gs~L 11Mi'F
REFUSED 8-26-93
BRUNSWICK TIP f BATS93-02 CONG DIST. 1 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
GLYNN 522730
STATUS:
SR 25 AT TALMADGE A~mmtn; BRUNSWICK
INTERSECTION IMPROVEMEN1 I SAFETY
PROJECT MILEAGE: .27 - EXIST. LANES:
MANAGER: BURT RIDDLE
==
REQ CITY OF BRUNSWICK DOR~:
BRUNSWICK TIP f BATS94-08 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
GLYNN 52Y045
STATUS:
SIDNEY LANIER BRIDGE MAIN SPAN - FOR BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: NOT APPLICABLE
DIST. 1
FUND SOURCE: STATE FUNDS_ lfEQJ:!l~ HIGHWAY ADMIN FUNDS
GLYNN: 570840
STATUS:
HISTORIC WAT~RFRONT
BRUNSWicKiffp f BATS94-14
ttmns MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED MANAGER: KEITH GOLDEN
LANES:,8:-:0-,.:::>:<r-<. >::.c:pf_-?-,?.__: '.DI STY :f
FUNo :sdTMdi = TRANS..
ENHANCE> -
TO BE DONE BY CONTRACT
FEDERAiDfi:GHWAY Af.l~rN
GLYNN 57100X
STATUS:
A STUDYOF BIKE/PEDESTRIAN PATHS IN COASTAL GEORGIA;
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:
FUND SOURc:ii!\\}4!:~. ENHANCE. FEO~HfG!lti)AY ADMIN
22-Feb-1994 Page 20
FISCAL YEAR
COST ESTS
PE NONE $
ROW NONE
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 59315 47452 11863
PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 2781
FED SHARE $ 2225 GA. SHARE $ 556 0TH SHARE $
PE NONE $
0
ROW LOCL
CONST 1995 $ 270
FED SHARE $ 270
GA. SHARE $
0TH SHARE $
PE NONE
$
ROW NONE
$
CONST 1996 $
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 3186 1593
1593
PE LOCL
ROW LOCL
CONST 1995 $ 813
FED SHARE $
650
GA. SHARE $-
0TH SHARE $ 163
PE 1995. $
0
ROW NONE $
0
NONE $
0
GLYNN 5V1014
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS.RECIPIENT: AGENCIES IN GLYNN MPO AREA MANAGER: STEVE KISH
FUND SOURCE: FEDERAL TRANSIT
CAPITAL 1995
$
17
FUND FED SHARE$
14
GA. SHARE$
1
0TH SHARE$
2
. .
. ,,
llm!l':I
~
~
~
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 21
FISCAL YEAR
COST ESTS
GLYNN 5Vl015
STATUS:
ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN GLYNN MANAGER: STEVE KISH
CONG DIST. 1
CAPITAL 1996
$
17
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
14
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
2
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
JEFF DAV SR 19 FM McCLOUD RD/CR 321 TO NORTH OF ~c:~~.uu
522660 TURN LANES / SAFETY
. '
PROJECT MILEAGE: .46 - EXIST. LANES:
MANAGER: PETE BLOCKER
STATUS: JEFF DAVIS SIGNED FOR UTILITIES
CIR/CR 146 LANES: 3
CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-199.4 Page 22
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW 1995
$
126
CONST 1996
$
365
FED SHARE $
365
GA. SHARE $
0TH SHARE $
I
.,
I mm:m,
~
~
~
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
.COMMENTS
LIBERTY 520781
STATUS:
SR 196 FM US84/SR 38 TO SR 17/SR 25 SW RECONSTRUCTION&. WIDENING FROM 2 LANES PROJECT MILEAGE : 8.85 MANAGER: M. REYNOLDS SEND LGPA IN 1997
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FONDS
22-Feb-1994 Page 23
FISCAL YEAR
COST ESTS
PE 1992 ROW 1996 CONST
UNDERWAY
$
950
AFTER 97
LIBERTY 521190
STATUS:
SR 196/@ BAKER SWAMP SLOUGH REPLACEMENT OF THE EXISTING 0~~1/~~~, PROJECT MILEAGE : .20 MANAGER: M. REYNOLDS COUNTY AGREED 12-17-84
LIBERTY 522570
STATUS:
US 84 CONNECTOR FM S CONSTRUCTIONOF NEW PROJECT MILEAGE : 3.70 MANAGER: GENE POWELL (M) SEND LGPA WHEN PROJECT IS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. l GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1985 UNDERWAY
ROW 1987
UNDERWAY
CONST 1997
$
459
FED SHARE $
367
GA. SHARE $
92
0TH SHARE $
PE 1995 ROW CONST
$
380
AFTER 97
AFTER 97
LIBERTY 531180
.STATUS:
SR 196 FM NW CR 119 TO 4-LANE SEC@ JOYNER DR/CR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 PROJECT MILEAGE : 2.78. MANAGER: PETE BLOCKER LIBERTY SGN 3-11-92 UTIL AND HINESVILLE
LIBERTY 541940
sTATUS:
FRANK COCHRAN DR EXT FM SR 196@ CS 8823 TO US CONSTRUCTION"OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.20
MANAGER: GENE POWELL, (M) SEND LGPA IN 1995
DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
~=~'::~.111;i \=coNG Distl
SURFACE TRJ&J1)Jt@'.
FEDEAAt:ltIGHWAY ADMIN'FUNDS
PE 1992
UNDERWAY.
ROW 1994
$
405
CONST 1997
$ 4612.
FED SHARE $ 3690
GA. SHARE $
922
0TH SHARE $
PE 1993 ROW 1996 CONST
UNDERWAY $ 3100 AFTER 97
LIBERTY THE LIBERTY TRAIL.FM RICEBORO & MIDWAY TO SUNBURY-HIST SITE 570990 BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: T. LONG STATUS: . LGPA TO BE DONE BY CONTRACT
LIBERTY 571030
STATUS:
CEMETERY WALL REPAIR@ MIDWAY CHURCH MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: T. LONG LGPATO BE DONE BY CONTRACT
4~s. FOND SOORci'i: 1
FED
., . :G .. ''Ay ADMI
CONG DIST. :,1
FUND SOURCE: FEDERAL HIGHWAY
PE NONE $
0
ROW NONE
$
0
1995
$
125
FED SHARE $
100
GA. SHARE $
0TH SHARE $-
25
PE LOCL
ROW NONE
$
0
CONST 1997
$
48
FED SHARE $
38
GA. SHARE $
0TH SHARE $
10
COUNTY P.I.NO.
DESCRIPTION . PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
LONG;,, 5B1304.
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FONDS RECIPIENT: LONG MANAGER: STEVE KISH
CONG DIST. 1
FOND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FONDS
LONG 5B1305
STATUS:
COUNTY OPERATED PUBLIC TRANSIT FACILITIES/ FUNDS RECIPIENT: LONG MANAGER: STEVE KISH
CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 24
FISCAL YEAR
.COST ESTS
OPERATING 1995
$.
39
E:ED SHARE $
23
GA. SHARE $
0TH SHARE $
16
OPERATING 1996
$
42
FED SHARE $
25
GA. SHARE $
0TH SHARE $
17
.
4,
. {
im:!!m9 rrz==
~
~
lvJJ,M
~~
\ ......
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
MCINTOSH I-95@ ALTAMAHA RIVER AND GLYNN 51110X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: L. SEABROOK STATUS:
CONG DIST. 1
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS 511102 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 25
FISCAL YEAR
COST ESTS
PE 1995 $
0
ROW NONE
$
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
MCINTOSH I-95 FM SR 57 TO LIBERTY CO 511130 RECONSTRUCTION & WIDENING
PROJECT MILEAGE : 8.26
MANAGER: M. REYNOLDS (M) STATUS: MCINTOSH COUNTY SIGNED
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y130 IS AN ASSOCIATED PROJECT.
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1997
$ 25943
FED SHARE $ 20754
GA. SHARE $ 5189
0TH SHARE $
MCINTOSH I-95@ ALTAMAHA 51Yl02 UNKNOWN/ UNKNOWN
PROJECT MILEAGE MANAGER: STATUS:
PE
AFTER 97
CONG DIST. 0 & 0
ROW
AFTER 97
0
CONST 1995 $ 3000
FUND SOURCE: NAT'L HIGHWAY
FED SHARE $ 2400
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 600
511102 IS AN ASSOCIATED PROJECT.
0TH SHARE $
MCINTOSH I-95 FM SR 57 TO LIBERTY CO LINE 51Y130 RECONSTRUCTION & WIDENING FROM 2
PROJECT MILEAGE : 8.26 MANAGER: UNKNOWN STATUS: MCINTOSH COUNTY SIGNED FOR UTILITIES
MCINTOSH SR 25/US 17@ BUTLER RIVER 1 MI SOUTH OF 522240 REPLACEMENT OF THE EXISTING BRIDGES (S) . NO ADDED LANES. ,:
PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER STATUS: MCINTOSH SIGNED.FOR UTILITIES 6-9-92
DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS :5.lff361s AN ASSOCIATED PROJECT.
,:-:-:->:-:
PE 1993
UNDERWAY,
ROW NONE
$
0
CONST 1997
$ 6000
FED SHARE $ 5400
GA. SHARE $
600
0TH SHARE $
PE 1993 UNDERWAY
ROW 1995 $
5
CONST 1997
$ 3672
FED SHARE $ 2938
GA. SHARE $
734
0TH SHARE $
MCINTOSH CR 59 E OF JCT W/SR 99@ UNNAMED STREAM 570750 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER STATUS: REQ COUNTY DO ROW, UTILITIES & DETOURS 8-26-93
\i{APNG DIST.
FUND souRci:dMiHDGE
FEDERAL :itfdftij11.y
PE 1994
UNDERWAY
ROW LOCL
:-:-:-:-::=:=:=;,:=tbNST 19 9 6
$
230
FED SHARE $
184
GA. SHARE $
46
0TH SHARE $
MCINTOSH CITY OF DARIEN HISTORIC DISTRICT/LANDSCAPE 571020 BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STAN HAMES STATUS: LGPA TO BE DONE BY CONTRACT
CONG DIST. \1 FUND SOURCE: TRANsff imkANcE.
FEDERAL HIGHWAY iIDM:i:_jif FUNDS
PE LOCL
ROW NONE $
0
CONST 1995
$
250
FED SHARE $
200
GA. SHARE $
0TH SHARE $
50
.GEORGIA.DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 26
PROJECT LISTING BY COUNTY FY 1995/FY 1997
. COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-------------------------.----------------------' ------------------------------------------------------------------------------------
MONTGOME SR 135 AT OCONEE CREEK
PE 1992 UNDERWAY
522250 REPLACEMENT OF THE EXISTING BRIDGES(S).
CONG DIST. 1
ROW 1994
$
44
PROJECT MILEAGE : .00
CONST 1995
$
572
MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
458
STATUS: MONTGOMERY COUNTY SIGNED 6-26-91
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
114
522252 IS AN ASSOCIATED PROJECT.
0TH SHARE $
MONTGOME SR 135 AT BUCKHORN CREEK NORTH 522252 REPLACEMENT OF THE EXISTING 0~~~!~~~~1
PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER STATUS: MONTGOMERY SGN 6-26-91
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 522250 IS AN ASSOCIATED PROJECT.
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1995
$
337
FED SHARE $
270
GA. SHARE $
67
0TH SHARE $
MONTGOME SR 15 BTWN HIGGSTON 522520 ADDITION OF A PASSING
PROJECT MILEAGE : 2.40 MANAGER: PETE BLOCKER STATUS: SEND LGPA IN 1996
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW 1997 CONST
$
27
$
5
AFTER 97
MONTGOME COUNTY OPERATED PUBLIC TRANSIT SERVICE 5B1309 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MONTGOMERY MANAGER: STEVE KISH STATUS:.
MONTGOME COUNTY OPERATED PUBLIC TRANSIT SERVICE 5B1310 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MONTGOMERY MANAGER: STEVE KISH STATUS:
DIST. 1
OPERATING 1995
$
36
FUND SOURCE: RURAL TRANSIT
~
FED SHARE$
22
f~~~ TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
14
])t::99rc; Did:tti . ..,,.:::,:-..::=::::.:;::::::
1996 . $
38
FED SHARE$
23
GA. SHARE$
0TH. SHARE $
15
r,
- .....
~
li!!lll!!5l!l!
~
~
COUNTY P:I.NO.
DESCRIPTION PROJECT DATA
PIERCE 531280
STATUS:
SR 203@ ALABAHA RIVER OFLW REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER PIERCE SIGNED FOR UTILITIES
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PIERCE 531285
STATUS:
SR 203@ ALA.BARA RIVER REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER REQ PIERCE COUNTY DO
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PIERCE 532470
STATUS:
SR 15 OVER BURNEY REPLACEMENT OF THE PROJECT MILEAGE : .00 MANAGER: SEND LGPA IN 1995
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PIERCE 5Bl314
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: PIERCE MANAGER: STEVE KISH
PIERCE 5B1315
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PIERCE MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT FED.:.;-_E::: RAL TRANSIT ADMIN FUNDS
...==::::::;:::
22-Feb-1994 Page 27
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1995 $
5
CONST 1995
$
386
FED SHARE $
309
GA. SHARE $
77
0TH SHARE $
PE 1993 UNDERWAY
ROW 1995 $
1
CONST 1995
$
745
FED SHARE $
596
GA. SHARE $
149
0TH SHARE $
PE 1994 UNDERWAY
ROW 1996 $
1
CONST 1997
$
627
FED SHARE $
502
GA. SHARE $
125
0TH SHARE $
OPERATING 1995
$
41
FED SHARE$
24
GA. SHARE$
0TH SHARE$
17
1996 $
43
FED SHARE$
25
GA. SHARE$
0TH SHARE$
18
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TATTNALL SR 73/US 301 FM N CL/GLENNVILLE TO EVANS.CO LINE 522000 RECONSTRUCTION & WIDENING FROM 2 LANES TQ,:,~ LANES.
PROJECT MILEAGE : 7.16
STATUS: ~A;!~~N~i,u~~~c~:l;SGN EVANS 10-8-,9:iJBii410-8-91 P.UTIL
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
TATTNALL SR 23 @ THOMAS CREEK 2 MI SE OF.
522260 REPLACEMENT OF THE EXISTING BRti5.Gt'.f3:(sj . NO ADDED IJffi!s.
PROJECT MILEAGE : .00
~;dJ]Jii STATUS: ~~;~~LP~;~N~~o~~~:ED
DO UTILITIES.
TATTNALL SR 30/0S 280: OVER -:rit8M.($ CREEK NE OF REIDSVILLE
522620 REPLACEMENT OF .THE EXIST!~9 BRIDGES (S) . NO ADDED/Pw.ts; PROJECT MILEAGE : .00
MANAGER: STATUS: SEND LGPA IN 1996
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TATTNALL SR 147@ OHOOPEE RIVER 4 MI 531290 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER STATUS: REQ TATTNALL COUNTY DO UTILITIES 1-24-92
DIST. 1
FUND SOURCE: BRIDGE PROGRAM fEl,)!ilMI, HIGHWAY ADMIN FUNDS
TATTNALL SR 196 OVER BEARD'S CREEK & .LONG COUNTY 541960 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00
MANAGER: STATUS: SEND LGPA IN 1995
22-Feb-1994 Page 28
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1995
$
386
CONST 1997
$ 6064
FED SHARE $ 4851
GA. SHARE $ 1213
0TH SHARE $
PE 1992
UNDERWAY
ROW 1995
$
5
CONST 1995
$
751
FED SHARE $
601
GA. SHARE $
150
0TH SHARE $
PE 1995 ROW 1997 CONST
$
10
$
1
AFTER 97
PE 1993
UNDERWAY
ROW 1995
$
5
CONST 1995
$ 3722
FED SHARE $ 2978
GA. SHARE $
744
0TH SHARE $
PE 1994
UNDERWAY
ROW 1996
$
1
CONST 1997
$ 1100
FED SHARE $
880
GA. SHARE $
220
0TH SHARE $
~
~
~
r.:::::l!lml
~
~ 'I
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 29
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
---------------------------------------------------------------
~----------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E--ST--S--
TELFAIR SR 30/US 280@ TURNPIKE CREEK 1.2 MI E
PE 1994 UNDERWAY
532560 REPLACEMENT OF THE EXISTING BRIDGES(S).
CONG DIST. 8
ROW 1995
$
10
PROJECT MILEAGE : .23
CONST 1995
$
583
MANAGER: PETE BLOCKER
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
466
STATUS: TELFAIF COUNTY SIGNED FOR UTILITIES
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
117
0TH SHARE $
TELFAIR 5Bl319
STATUS:
COUNTY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1995
$
51
FUND SOURCE: RURAL TRANSIT
FED SHARE $
29
FEDERAL TRANSIT ADMIN FONDS
GA. SHARE $
0TH SHARE $
22
TELFAIR 5Bl320
STATUS:
COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH
CONG DIST. 8
OPERATING 1996 $
54
FUND SOURCE: RURAL TRANSIT
FED SHARE $
31
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
23
TELFAIR 5C2319
STATUS:
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 8
CAPITAL 1995
$
29
SOURCE: RURAL TRANSIT
FED SHARE $
23
TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE $
3
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
TOOMBS SR 130 @ SWIFT CREEK 1 MI NE OF VIDALIA>.
522270 REPLACEMENT OF THE EXISTING BRIDGES(S). tlQ ADDED LANES.
CONG DIST. 1
STATUS:
~:~~~:i~~rh~~~!~6-27-91 FOR UTILITi~~:;: ..--;--
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
TOOMBS 522320
STATUS:
SR 30 FM MORNINGSIDE TO BROAD FQji/~8ilk ST {& 1:ti~ PAIR)
CONSTRUCTION OF NEW ROUTE WITli:J( i'.Ji.NE$ PROPOSED.
PROJECT MILEAGE : 2.15
~A;~~~B~. D~~~:E:Ii~iiti::li):~:r VIDALIA SGN UTIL iii5-93
;~~~~
STATUS:
di~lt Eg~ij~~~L~~~~E~~f~ i:P~~,~~~TR5~~a:D
NO ADDED
PROJECT MILEAGE: 1.00
MANAGER: PETE BLOCKER
>::::,:::>.=:-:-.
TOOMBS SGN DO ROW, UTILITIES'iANJ:l
CONG DIST. l FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 30
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1995
$
6
CONST 1995
$
824
FED SHARE $
659
GA. SHARE $
165
0TH SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY
$
394
AFTER 97
PE 1995 ROW LOCL CONST
$
8
AFTER 97
.
mliCil!a
ll!!S'llm
l!!i!ffl!!!!
l!!l!!ml
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATIQN IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WARE 521530
STATUS:
WARE 522775
STATUS:
SR 4/0S 1/WAYCROSS FM N/BLACKSHEAR AVE TQ CR 465@ JAMESTOWN RECONSTRUCTION & WIDENING FROM 2 LANES T.4 LANES.
t8l.~~:~]~Z- ~t~~R B~~~~~~; PROJECT MILEAGE : 1.51
;E~~~:D
DOT TO BOY ROW
SR 38/os 84 OVER GREASY BRANCH, ;et}ltf,tr/!,
~~h&mR CREEK
REHAB. OF THE EXISTING BRIDGEJ.$)J::~6M 2 LANES TO 4\LANES.
PROJECT MILEAGE : . 00
... ....
MANAGER: M GANNAWAY (M)
SEND LGPA IN 1997
CONG DIST. l GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FONDS
CONG DIST. 1 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS 522770 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 31
FISCAL YEAR
COST ESTS
PE 1992 ROW 1997 CONST
UNDERWAY $ 1550 AFTER 97
. PE 1995 ROW NONE CONST
$
33
$
0
AFTER 97
WARE 570970
STATUS:
<:#lif&' ALONG SR 4 FROM L. S .
SP TO WAYCROSS &
BICYCLE/PED .. FACILITY /:t#!!ANCEMENT
PROJECT MILEAGE: .00 - EXIST. LANES: 0
MANAGER: NEAL WILKES .
LGPA TO BE DONE BY CONTRACT
CONG DIST. 1 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE
$
0
CONST 1997
$ 1250
FED SHARE $ 1000
GA. SHARE $
0TH SHARE $
250
I
WARE 570980
STATUS:
RESTORE DEPOT & RAILWAY EXPRESS IN WAYCROSS MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 MANAGER: NEAL WILKES LGPA TO BE DONE _BY CONTRACT
DIST. 1
SOURCE: TRANS. ENHANCE. HIGHWAY ADMIN FUNDS
PE 1995
$
ROW NONE
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
80 0
1170 936 16 250
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
WAYNE 52258X
STATUS:
SR 27/US 341 FM CL SURRENCY RECONSTRUCTION & WIDENING. PROJECT MILEAGE : .00 MANAGER: UNKNOWN
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 1 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 522580 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 32
FISCAL YEAR
COST ESTS
PE 1995 $
0
ROW 1996
$
0
CONST 1997
$
0
FED SHARE$
GA. SHARE$
0TH .SHARE$
: I
~
~
~
COUNTY P.I,NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WHEELER 5Bl324
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH
CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
WHEELER 5B1325
STATUS:
COUNTY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH
I
WHEELER 5C2324
STATUS:
ONE CONVERSION VAN TRANSIT FACILITIES FUNDS RECIPIENT: MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. B FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 33
FISCAL YEAR
COST ESTS
OPERATING 1995
$
36
FED SHARE $
21
GA, SHARE $
0TH SHARE $
15
OPERATING 1996
$
38
FED SHARE $
22
GA, SHARE $
0TH SHARE $
16
CAPITAL 1995
$
29
FED SHARE $
23
GA. SHARE $
3
0TH SHARE $
3
=
=
~
COUNTY P.I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BARTOW
610950
STATUS:
I-75 MILL ANO INLAY FM US 411/SR61 TO SR. 140
RIDING SURFACE REHABILITATION. SURFACE//~RIND, SE.AL, STRIPE ETC.CONG DIST. 7
PROJECT MILEAGE : 12.10 - EXIST, LANES: O.>/PROPOSED LANES: 0
MANAGER: L. SEABROOK
- -- -
NOT APPLICABLE
':,<~_:'.;': ,-'
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
,,:,it
BARTOW 610960
STATUS:
I-'15 AT SR 20
/)}:<,;'
RECONSTRUCTION &. WIDENING FROM''"f ,-IJ\NEs TO 4
PROJECT MILEAGE : .OO
MANAGER: GENE PDmLL
,;,.,: _, :j;_():"
BARTOW COUNTY SIGNED l0-4i93)/!Jit UTILITIES
,,.;f~,,--,
CONG DIST. 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
BARTOW__ 620633
BAR'rOW
621410 STATUS:
.... :- ' -: : ,. -c
SR 61 @ TWO ETOWAH RIV'Eti,0VERFLOWS
,--,;'
REPLACEMENT OF THE EXISTtNG BRIDGES(S). FROM 2 T6'TiANES.
CONG DIST. 7
PROJECT MILEAGE : .36 , ,.
,,,:;,:\ '_'./
;;~l::rll~L. -~-?; 7 ~~t~~Ri2 a4~~~~~D~ITY sIG;i~_fl,~/84..,
rgt AS ,_
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
621255 rs AN ASSOCIATED PROJECT.
,,,',,.
-~hi\:lif: SR 113 RELOC_FM PRESENT SR 113 TO CR 636;T~~::E TO
,:h,c, 00'' '.:),,,.
RECONSTRUCTION & WIDENING. NO LANE ADDITION PROP9!JE_Q,j,,I,:--
.._(:_ONG DIST. 7
PROJECT MILEAGE : 7. 70
MANAGER: M GANNAWAY (CM)
,,,: FUND SOURCE: SURFACE TRANSPORT.
BARTOW REFUSED 11-23-92; EMERSON REFUSED
F~O~l?J\L. HIGHWAY ADMIN FUNDS
d,:, if'.i:
BARTOW 621430
STATUS:
SR 113 FM S/TAYLORSVILLE CL NE TO CR 31/STILESBORO/POLK RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.57 MANAGER: M GANNAWAY (CM) REQ POLK/ UTIL 6/91:BARTOW REFUSED 11/92:cITY NO UTIL
BARTOW 621440
STATUS:
SR 113 FM CR 31/STILESBORO NE TO SR 61 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.39 MANAGER: M GANNAWAY (CM) BARTOW COUNTY REFUSED 11-23-92
--,_:cONG DIST<,- :t-7.
-,,,,, (,,;,!,
. _,.:;:;:{.'
FUNp_,~oURbE; suRF-AcE TRMi~i6~4':
FEDERliJ0HIGHWAY ADMIN 'Fti~i:fS
E;2U:Wi i::s AN Assoc_:r:~~Ei;)/PRoJEcT
:
:-.. (
...,.,.,..
'L<.
'
:;
,.;; .<:','"" -
cc.-,.,.
:.. 'S'' .. ,'
:'...':tcr'.~,:C':(O' NG DIST. 7 .;
c;,.,:~~ soua_citts_ciRFAcE TRANsP6k&t:
FEDERAL.HIGHWAY ADMIN FUNDS " - ,
aARTOW 62168X
STATUS:
SR 61@ 3 LOCATIONS PAULDING & BARTOW .. SEE PAULDING CO UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES:. 0 /PROPOSED LANES: 0 MANAGER:
CONG DIST. ,7
.,.~ .
,-;:.\/Y
FUND SOURCE: SURFA~i-:_i;~SPORT.
FEDERAL HIGHWAY AD!iIN FUNDS
621680 rs AN ASSOC~ATED Pfl.OJECT.
,, ,-:,;:,,'.:::
22-Feb-1994 Page 1
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1995
$ 2220
FED SHARE: $ 199B
GA. SHARE $
222
0TH SHARE $
PE 1994
$
20
ROW 1995
$
10
CONST 1996
$
233
FED.SHARE$
210
GA, SHARE$
23
0TH SHARE$
PE 1996 ROW NONE CONST
'
10
'AFTEFI. 907
PS MW CONST
$
184
AFTER 97
AFTER 97
PE 1993
ROW 1996 CONST
UNDERWAY $ 1954 AFTER 97
PE 1996
ROW CONS'l'
$
204
AFTEFI. 97
AFTER 97
PS ROW CONST
'
0
AFTER 97
AFTER 97
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 2
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
-P--. I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A------------------------------------------
.--
COMMENTS
YEAR
ESTS
~----. -------------------------------------------
BARTOW SR 3/US 41@ MOCKING BIRD DRIVE/CENTER RI;> IN CARTERSVILLE
PE NONE $
0
631400. INTERSECTION IMPROVEMENT / SAFETY
':-::.
.
CONG DIST. 7
ROW LOCL
PROJECT MILEAGE :. . 36 - EXIST. LANES: 4 (:~:~9.POSED LANES: 6
CONST 1995
$
577
MANAGER: BILL MCVEY
FUND SOURCE: HWY. SAFETY
FED SHARE $
519
STATUS:
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
58
0TH SHARE $
BARTOW 631402
STATUS:
SR 3/US 41 FROM POSTELLE ST/CS ]~~f~'g}fu.K IN CART'iitsVILLE
,x~~f?-~: ::;~~~c~i~~A~~~0f~~N:
0 /PROPOSED tJlliEs: 0
MANAGER: BURT RIDDLE
. )}
SEE STP-001-5 (50), PI i6~J)fQO:
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
s
10
ROW LOCL
CONST 1996
$
565
FED SHARE $
509
GA. SHARE $
57
0TH SHARE $
BARTOW 641870
STATUS:
SR 293 @ GRASSDALE ~/fIHffs5
INTERSECTION IMPROVEMENT)J,.sAFETY
. w ww
PROJECT MILEAGE : . 2 6 - Eki:sT . LANES : 2 /PROPosi$?W.$ls : 2
MANAGER: BILL MCVEY
:,:,:,:,,,,,:.
COUNTY SGN 10-14-91 FOR ROW &: UTILITIES .:fltirnddkcT
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
BARTOW 670688
STATUS:
di 1; p INE LOG CREEK 7 . 2 MI N
BRIDGES (S). NO ADDED I.ANE~/
.
:/\boNG DIST. 7 :::;j([!f(!ii!=
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW 1995 $
70
CONST 1995
$
170
FED SHARE $
136
GA. SHARE $
34
0TH SHARE $
PE 1994
UNDERWAY
ROW LOCL
CONST 1996
$
387
FED SHARE $
310
GA. SHARE $
77
0TH SHARE $
BARTOW 670910
STATUS:
CARTERSVILLE STREETSCAPE MASTER PLAN; LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: STEVE YOST LGPA TO BE DONE BY CONTRACT
FUND sotiifoi = TRANfl. ENH.iill8it
FEDtAM/:ittGHWAY
ADMIN: P'.tiNDS
:-::-:
.
PE 1995 $
ROW NONE $
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
144
0 1106
885 29
250.
BARTOW 670990
STATUS:
COVERED BRIDGE OVER EUHARLEE CREEK NEAR CR 30 BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER: UNKNOWN DOT WILL PROVIDE THE 20% MATCH
:: 'tJJ[> sou~qtf\ifiUNs. ENHANCE. FEDE-RA,.-L.-i:i-:I:;:G;:;:::l:i::W:::::AY ADMIN
PE 1995
$
50
ROW NONE $
0
1995
$
176
FED SHARE $
141
GA. SHARE $
35
0TH SHARE $
BARTOW 6B1329
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS .FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH
- CONG DIST. "'-7
FUND SOURCE: . FEDERAL TRANSIT
OPERATING 1995
$
106
FED SHARE$
58
GA. SHARE$
0TH SHARE$
48
..
eern;im
mm=
~
~
i.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BARTOW 6B1330
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS
BARTOW 6C2329
STATUS:
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS
BARTOW 6C2330
STATUS:
ONE STANDARO,VAN TRANSIT FACILITIES/ FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH LGPA NOT APPLICABLE
..J
CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS
22-Feb-1994 Page 3
FISCAL YEAR
COST ESTS
OPERATING 1996
$
110
FED SHARE $
61
GA. SHARE $
0TH SHARE $
50
CAPITAL 1995
$
32
FED SHARE $
26
GA. SHARE $
3
0TH SHARE $
3
CAPITAL 1996
$
20
FED SHARE $
16
GA. SHARE $
2
0TH SHARE $
2
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CARROLL 621770
STATUS:
CARROLLTON BYP FM 4-LN S/US 27A TO 4-LN\ON BANKHEAD/& CLVT
RECONSTRUCTION & WIDENING FROM 2 LANES 1'6: 4 LANES.
~~~ ~~~:~:r:i~il::LTON SGN 10-28-90
6TnITIES
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CARROLL 621820
STATUS:
::g~~~ SR 61 AT SR 166 ,I~~~iy: . 00 - EXISTs::mrl; 0 /PROPOSED ~Es: 0 MANAGER: BURT RIDDLE CONTACT TRAFFIC OPERATIONS:::C:\/:=::::c=::=:,
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CARROLL 631320
STATUS:
SR 16/US 27ALT. FM S:<t~i ~; TO W OF STRIPLING CHAP':fil5)2R 24
RECONSTRUCTION & WIDENING/FROM 2 LANES TO 4. LANES\.. . ...
PROJECT MILEAGE : 1.65
.
MANAGER: J. GARLAND
CO REFUSED ll-4-92;CITY SGN
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 4.
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1994
$
10
CONST 1995 $ 5865
FED SHARE $ 4692
GA. SHARE $ 1173
0TH SHARE $
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1996
$
231
FED SHARE $ 231
GA. SHARE $
0TH SHARE $
PE 1993 ROW 1996 CONST
UNDERWAY $ 1531 AFTER 97
CARROLL 641890
STATUS:
N CARROLLTON BYP/SR 166 CONN. FM RECONSTRUCTION & WIDENING FROM 2 PROJECT MILEAGE : 2.90 MANAGER: J. GARLAND (M) REQ CO DO UTIL 6-4-92; CARROLLTON
DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 2429 AFTER 97
CARROLL 641910
STATUS:
SR 100 NB MP 5.30-4.28; SB MP 6.9-7.89 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.01 MANAGER: BILL MCVEY (M) SEND LGPA IN 1995
CARROLL. SR 8/US 78 AT CS 777
650480 TURN LANES/ sAFETY
PROJECT MILE~GE: .23 EXIST, LANES: 2 /PROPOSED LANES: 3
MANAGER: BURT RIDDLE
STATUS: REVISED REQ VILLA RICA DO ROW & UTIL 2-17-94
OTO
CARROLL . CR 217 /PLOWSHARE RD. @ BUCK CREEK
662500 REPLACEMENT OF THE EXISTING BRIDGES (S) .. NO..ADDED .LANES ..
PROJECT MILEAGE: .00.
.
'MANAGER: BILL MCVEY
STATUS: coUNTY SGN 11/90 ROW & UTIL; CARROLLTON - NO UTIL INVOLVED
F:~::::~9.tm9t: SURFACE TR1ffiii'iB~i:
FEl.)ERAL}ltIGHWAY AD~I.~(ff~t>S.
PE 1994
UNDERWAY
ROW 1996
$
164
CONST 1997
$
882
FED SHARE $
706
GA. SHARE $
176
0TH SHARE $
iBNo souRC,w:mH. SAFETY
FEDE.-.R-:,.-A..L:--iff-o...k.#.. AY ADMIN.FUNDS
PE 1994
UNDERWAY
ROW NONE
$
0
::-:=:<tONST 1996
$
165.
FED SHARE $
149
GA. SHARE $
17
0TH SHARE $
CONG--DIST. +1
ik6GRAM ADMiN FUND souRcE: BRiodtf
FEDERAL HIGHWAY
FUNDS
PE 1992 UNDERWAY
ROW LOCI.
CONST 1995
$
339
FED SHARE$
271
GA. SHARE$
68
0TH SHARE$
ammm!
ll!!ffl!!lffl ~ ~ r::rnm
,,
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CATOOSA 610720
STATUS:
I-75: REPLACEMENT OF WELCOME CENTER REST AREA/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: J. GARLAND (C) DEPT I&T SGN CT FOR PE, CST 6-23-93;
RINGGOLD 0
CHATTANOOGA TIP f 3 CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CATOOSA 610730
STATUS:
I-75@ SR 3/US 41 INTERCHANGE/ RECST. OR PROJECT MILEAGE : .00 MANAGER: GENS POWELL REQ CATOOSA COUNTY DO
CHATTANOOGA TIP t 10
CONG DIST. 9 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 5
FISCAL YEAR
COST ESTS
PE 1991 UNDERWAY
ROW 1994
$
672
CONST 1995 $ 4080
FED SHARE$ 3672
GA. SHARE$
592
0TH SHARE$ 1000
PE 1992 ROW 1996 CONST
UNDERWAY ' $ 6000 AFTER 97
CATOOSA 610800
STATUS:
RI -E7C5ONFSMTRSURCT2IO TNO &SR Tn,~~r.FJ')~;~.~~~
PROJECT MILEAGE : 3.63
MANAGER: RAY METTS (M) SEND LGPA IN 1995
CHATTANOOGA TIP f 14 CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST
UNDERWAY $ 1000 AFTER 97
CATOOSA 610810
STATUS:
I-75 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 6 LANES PROJECT MILEAGE : 1.42 MANAGER: RAY METTS (M) SEND LGPA IN 1995
~n~ii~~uu~= TIP f 13
9
FUND SOURCE: NAT'L HIGHWAY _E;EDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1996 CONST.
UNDERWAY
$
500
AFTER 97
CATOOSA 610820
STATUS:
CD SYSTEM FM $/SCROGGS RD TO.TENNESSEE STATE CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE: .50 MANAGER: RAY METTS (M) SEND LGPA IN 1995
\~~:~T:~~liTIP t 12
FFEUQN!li;k::A::ii&J:iwiiGeHkW: ANYATA'.LDMHiImG:FHtmw.Dst:::
PE 1993 ROW 1996 CONST
UNDERWAY
$
107
AFTER 97
CATOOSA 621530
STATUS:
SR 151 FM RELOC. HACKETT RD/CR 179 N TO I-75@ RINGGOLD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.30 MANAGER: M GANNAWAY (M) SEND LGPA WHEN PROJECT IS ADDED TO CWP
PE 1992 ROW 1997
;{fu~ souRciif JBfu.AcE TRANSPciWif}\{ : toNST FEDERAL HfGHfiiAY ADMIN FUNDS ( : /: 62Y530 fa hlf ASSOCIATED PROJECT( :'::
UNDERWAY
$
200
AFTER 97
CATOOSA 631190
STATUS:
CR 382/0LD SR 2@ SOUTH CHICKAMAUGA CRK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER: BILL MCVEY REQ CITY DO ROW & UTIL 5-8-91; COUNTY SGN 5-10-91 PUBLIC UTL
CHATTAN~aaA TIP. 8 CONG DIST. \9
FUND souRcE: BRrodfAi'~&~RAM FEDERAL HIGHWAY ADMIN.FUNDS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995
$
303
FED SHARE$
242
GA. SHARE$
61
0TH SHARE$
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 6
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.N--O--. ---------------P-R-O-J-.E-C-T--D-A-T-A----------------------------------------------C-O-M-M--E-N-TS-.---------------------------Y-EA-R---------E-S-T-S--
CATOOSA SR2/SR 3/US 41 AT SPARKS STREET IN RING<;QLD
PE NONE
$
0
631420 TURN LANES / SAFETY
::.:.,.
PROJECT MILEAGE : .oo - EXIST. LANES: 0 l#R<>POSED LANES: 0
CONG DIST. 9
ROW 1995
$
10
CONST 1996
$
173
MANAGER: BILL MCVEY {M)
FUND SOURCE: UNKNOWN
FED SHARE $' 173
STATUS: CONTACT TRAFFIC OPERATIONS
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
CATOOSA 641820
STATUS:
CHATTANOOGA TIP i 6
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY.
ROW 1994
UNDERWAY
CONST 1995
$
741
FED.SHARE $
593
GA. SHARE $
148
0TH SHARE $_
CATOOSA 650430
STATUS:
SR 3/US 41 FM SR 146 TQ(fJ;\NNESSEE STATE LINE
RECONSTRUCTION & WIDENING.=\E'ROM 2 LANES TO 4
PROJECT MILEAGE : .66 MANAGER: M GANNAWAY (M)
=\ \c.
REQ CATOOSA COUNTY DO UTILITiitS
CHATTANOOGA TIP t 11
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY
$
165
AFTER 97
CATOOSA 650440
STATUS:
SR 146/CLOUD SPRINGS RD FM LAKEVIEW DR RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : 2.34 MANAGER: M GANNAWAY (M) REQ CATOOSA DO UTILITIES 3-2-92
'\::::::::::i~!~T:~~~\TIP t 15
,:
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS i6.Sf44Q,(ts AN ASSOCIATED PROJECT.
PE 1992 ROW 1996 CONST
UNDERWAY $ 1167 AFTER 97
CATOOSA SR 146 AT CROSS STREET
CHATTANooJii/rrp t 22
o:u:c= 650500 . SIGNALS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES:
?::coNG Disik 4
MANAGER: BURT RIDDLE
STATUS: CONTACT TRAFFIC OPERATIONS
PE NONE $
0
ROW NONE $
0
CONST 1996 $
64
FED SHARE$
51
GA. SHARE$
13
0TH SHARE$
CATOOSA SR 146/CLOUD SPGS RD FM LAKEVIEW TO I-75&BRIDGE .. SEE 650440 65Y440 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.34 MANAGER: M GANNAWAY STATUS:
J)#S'
PE 1992
ROW 1996
.FUND
souR~i;:rn&fu.AcE
CC:::,:)){:CONST TRANSPOR'fw
FEOERAL ,.i:t.fCiiWAY ADMIN FUNDS :///:/
650-240:=s' Jill- AssocrATED PR<>Jit-tl
UNDERWAY $ 544 AFTER 97
CATOOSA 6Bl334.
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS fUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH
CONG DIST. \c9
FUND SOURCE: RURA.t:ffuili~IT FEDERAL TRANSIT AOMIN FUNDS
OPERATING 1995 $
92
FED SHARE$
49
GA. SHARE$
0TH SHARE$, 43
.
~
~
~
~
~
i_
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CATOOSA 6B1335
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CATOOSA 6C2334
STATUS:
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CATOOSA 6C2335
STATUS:
ONE CONVERSION VAN TRANSIT FACILITIES/ FUNDS RECIPIENT: CATOOSA
MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 7
FISCAL YEAR
COST ESTS
OPERATING 1996 $
96
FED SHARE$
51
GA. SHARE $
0TH SHARE$
45
CAPITAL 1995
$
29
FED SHARE$
23
GA. SHARE$
3
0TH SHARE$
3
CAPITAL 1996
$
32
FED SHARE$
26
GA. SHARE$
3
0TH SHARE$
3
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CHATTOOG CR 1 NE OF TRION@ CHAPPEL CRK 670720 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : .00 MANAGER: BILL MCVEY STATUS: -CHATTOOGA SGN 5-10-91 FOR ROW,
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CHATTOOG CR 170/PENN BRIDGE RD OVER
670750 REPLACEMENT OF THE EXISTING-~-~~~~~-
PROJECT MILEAGE : .00
MANAGER: BILL MCVEY
STATUS:
CHATTOOGA SGN 4-7-92
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 8
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW LOCL
CONST 1995 $ 180
FED SHARE$ 144
GA. SHARE$
36
0TH SHARE$
PE 1993 UNDERWAY
ROW LOCL
CONST 1995 $ 1079
FED SHARE$ 863
GA. SHARE $
216
0TH SHARE$
.
/&&.,'@I
~
~
c;:-!!~. .~. ,.~W
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
CHEROKEE I-75@ SR 92 610740 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. MANAGER: RAY METTS (M) STATUS: SEND LGPA IN 1996
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ATLANTA TIP i CH/R 108
CONG DIST. 6
.
FUND SOURCE: NAT'LHIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 9
FISCAL YEAR
COST ESTS
PE 1992 ROW 1997 CONST
UNDERWAY $ 2495 AFTER 97
CHEROKEE I-575 SB ON RAMP FROM CR
610970 TURN LANES/ SAFETY PROJECT MILEAGE : .20 MANAGER: GENE POWELL
STATUS: CONTACT TRAFFIC
CHEROKEE SR 92 FM woobsTOCK 620920 RECONSTRUCTION &
PROJECT MILEAGE : 4.75 MANAGER: RAY METTS (M) STATUS: CHEROKEE COUNTY SGN FOR
ATLANTA TIP i CH 24
CONG DIST. 6 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP i CH 3
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
0
ROW NONE
$
0
CONST 1995
$
121
FED SHARE$
121
GA. SHARE$
0TH SHARE$
PE 1995ROW CONST
$ 150 AFTER 97 AFTER 97
CHEROKEE SR 92 FM I-75 TO WOODSTOCK RD 620940 RECONSTRUCTION & WIDENING FROM
PROJECT MILEAGE : 3.59 MANAGER: RAY METTS (M)
STATUS: CHEROKEE COUNTY SIGNED FOR UTILITIES 11-4191,,(lt? )
,:: :::::::::::[~~~~S;~P i CH 4
6
-::FUND SOURCE: NAT'L HIGHWAY _FEDERAL HIGHWAY ADMIN FUNDS
: ::::::::::::::;:;:::::;::_.::==:.:. :-:->::;:::
CHEROKEE SR 92 FM E 0~ SR 754 TO OLD MOUNTAIN PARK RD/C~:~ 621200 RECONSTRUCTIQN & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.10
STATUS: ~!G!R~I~\~!T~iIL 4/92;CHEROKEE REFUSED. DOT PAY Pv-r{,61%:.
)t~;~~~s~~!!~:i cH 20
FUND)soWJ't: NAT'L HIGHV'i'Af /
FED!ciu(ti:itiGHWAY
iiliMrn:'itiNifa
-:-:,
:-.-:-:-:;;:
CHEROKEE .SR 92 FM CHEROKEE TRAIL TO CANTON HWY/SR 754 621390 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10 MANAGER: GENE POWELL (M) STATUS: CO SGN 1/90 PUB UTL/WOODSTOCK SGN 12/90 UTIL. SEE 1620920
t:::I!:~G~~~s;~p 6! =~~
FtiND souRci:ftkkf~L HIGHWAY
FEDERAL. itfc;a,wJi.y ADM IN
PE 1995 _ROW.
CONST
$
150
AFTER 97
AFTER 97
PE 1992 UNDERWAY
ROW 1994
UNDERWAY
CONST 1996
$ 8975
FED SHARE $ 7180
GA. SHARE $ 1778
0TH SHARE $
17
PE 1992
ROW 1996 ::::::\(CONST
UNDERWAY $ 3712 AFTER 97
CHEROKEE CANTON HWY FM PALM RD/CR 351 TON/SIXES RD [INCL RR BR] 630673 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
PROJECT MILEAGE : .37 MANAGER: BILL MCVEY STATUS: CHEROKEE COUNTY SIGNED 9-23-91 FOR ROW AND UTILITIES.
h ATLANTA
i CH2
CONG DIST.:;::.6
'FUND souRcE: BRID&i:woGRAM
FEDERAL HIGHWAY ADMbf FUNDS
63Y673 IS AN Ass6j;11,TED PROJECT.
PE 1994
UNDERWAY
ROW LOCL
CONST 1996
$
500
FED SHARE$
400
GA. SHARE$
100
0TH SHARE$
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CHEROKEE CR 770/BELLS FERRY RD NEW PARALLEL BR @\LITTLE RIVER 630975 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .00 MANAGER: B FERGUSON STATUS: REQ CO DO ROW & UTIL 5-7-91 (INCLUDED,.J:J{[li[~;~~:Q}7:7)
ATLANTA TIP i CH.18
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
STATUS:
ATLANTA TIP. i CH 19 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CHEROKEE SR 140/CANTON-ROSWE~i\ful?J\:T CR 297/EARNEY RD & CRifi/MTN RD 631390
::~~~~c~i~~A!~P~O~~~Ti~i~~E~iNEs: 2 /PROPo~t#fflis: 4
MANAGER: BILL MCVEY STATUS: COUNTY SGN 11-23-92 FOR
ATLANTA TIP i CH 25
CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS'
CHEROKEE CANTON HWY FM PALM TO SIXES - FOR 63Y673 BRIDGES/ REPLACEMENT
PROJECT MILEAGE: .00 MANAGER: BILL MCVEY STATUS: CHEROKEE SIGNED 6-1-82
2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
6.36673 ts AN ASSOCIATED PROJECT.
CHEROKEE HISTORIC TRAIN DEPOT RESTORATION IN HOLLY
fo]\::t 670840 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES:' MANAGER: STEVE YOST STATUS: TO BE DONE BY CONTRACT
c: .~~~~~~i;~~~i& 22
s FUNoJidiffi:Bf = TRANS.. ENHANcs> HIGHWAY (
CHEROKEE HISTORIC DEPOT RESTORATION IN WOODSTOCK & SIDEWALKS 670850 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STEVE YOST STATUS: TO BE.DONE BY CONTRACT
.,.1: :~i~~~si~p6.!i:sf:1:~~:
FUND souRcil%iANs. ENHANCE
FEDERAL -HfGlit'i'.ifr ADMIN
CHEROKEE CR 362/MILL CREEK ROAD@ MILL CREEK 2 MI NE OF WOODSTOCK 670950 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .20 . MANAGER: BILL MCVEY STATUS:' SEND LGPA IN 1995
FUND SOURCE: FEDERAL HIGHWAY
22-Feb-1994 Page 10
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW LOCL
CONST 1996
$ 5526
FED SHARE $ 4421
GA. SHARE $ 1105
.OTH SHARE $
PE 1993
UNDERWAY
ROW LOCL
CONST 1996
$
690
FED SHARE $
552
GA. SHARE $
138
0TH SHARE $
PE NONE
$
0
ROW 1995
$
275
CONST 1995
$
418
FED SHARE $
376
GA. SHARE $
42
0TH SHARE $
PE 1994
UNDERWAY
ROW 1985
UNDERWAY
CONST 1996
$
321
FED SHARE $
257
GA. SHARE $
64
0TH SHARE $
PE LOCL
ROW LOCL
CONST_l996
$
175
FED SHARE $
140
GA. SHARE $
0TH SHARE $
35
PE LOCL
ROW LOCL
1995
$
125
FED SHARE $ 100
GA. SHARE $
0TH SHARE $
25
PE .1995 . . $
10
ROW LOCL
CONST 1997
$
428
FED SHARE$
342
GA. SHARE$
86
0TH SHARE$
~ !!!'!!!!I
~ =m
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 11
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------ ----------------------------------------------------------------------------------------------------------------
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE
6Bl339 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9 & 6
FUNDS RECIPIENT: CHEROKEE
OPERATING 1995
$
87
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE $
51
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
36
CHEROKEE COUNTY OPERATED PUBLIC TRANSIT 6Bl340 TRANSIT FACILITIES/
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH STATUS:
CONG DIST. 9 & 6
OPERATING 1996 $
90
FUND SOURCE: RURAL TRANSIT
FED SHARE $
53
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
37
CHEROKEE TWO CONVERSION VANS 6C2339 TRANSIT FACILITIES/
FUNDS RECIPIENT: CHJgR()KE:E'{ MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
CONG DIST. 9 & 6
CAPITAL 1995
$
57
FUND SOURCE: RURAL TRANSIT
FED SHARE $
46
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
5
0TH SHARE $
6
CHEROKEE ONE MINIBUS 6C2340 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
DIST. 9 & 6
CAPITAL 1996
$
42
SOURCE: RURAL TRANSIT
FED SHARE:$
34
TRANSIT ADMIN FUNDS
GA. SHARE$
4
0TH SHARE$
4
CHEROKEE ELDERLY AND bISABLED VEHICLES AND EQUIPMENT
6Vl014 TRANSIT PROJECTS/ CAPITAL
.FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY
16
MANAGER: STEVE KISH
13
STATUS:
1
2
CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: CHEROKEE COUNTY MANAGER: STEVE KISH
STATUS:
9,,:Jt:~l:}>>
FUND SOURC,f\EitbERLY &
FEDERALTfilili ......;. sfT ADMIN
1996
$
16
FED SHARE$
13
GA. SHARE$
1
0TH SHARE$
2
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
P,ROJECT LISTING BY, COUNTY FY 1995/FY 1997
COMMENTS
COBB 62120X
STATUS:
SR 92 FM E OF SR 754 TO OLD MOUNTAIN RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : .00 MANAGER: RAY METTS COUNTY SIGNED 7/30/87 FOR UTILITIES
ATLANTA TIP f CH 20
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY .ADMIN FUNDS 621200 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 12
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1994
UNDERWAY
CONST 1996
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
. ..
~
l!l!!!!!ffl
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DADE 610940
STATUS:
I-24 1 RESURFACE & GUARDRAIL FM TENN SL GUARDRAIL/ MAINTENANCE
PROJECT MILEAGE : 4.60 - EXIST. LANES: MANAGER: RAY METTS
NOT APPLICABLE
STATE LINE LANES: 4
CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
DADE 610990
STATUS:
I-24/I-59 INTERCHANGE - THREE BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: M GANNAWAY SEND LGPA IN 1996
CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 13
FISCAL YEAR
COST ESTS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
2300 2070
230
PE 1995 ROW NONE CONST
$
20
$
0
AFTER 97
DADE 621230
STATUS:
SR 136/TRENTON FM CR RECONSTRUCTION & WIDENING/FROM PROJECT MILEAGE : 1.00 MANAGER: M GANNAWAY DADE SGN 12-18-92 & TRENTON
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y230 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW 1996
$
410
CONST 1997 $ 2617
FED SHARE $ 2094
GA. SHARE $
523
0TH SHARE $
DADE 62Y230
STATUS:
SR 136 FM CR 52 TO SR 58; RECONSTRUCTION & WIDENING
PROJECT MILEAGE : .00 MANAGER: M GANNAWAY
PE NONE $
0
DIST. 9
ROW 1996
$
100
CONST 1997
$
500
FUND SOURCE: I-STATE MAINT.
FED SHARE$
450
FEDERAL HIGHWAY ADMIN FUNDS
:62f236 :IS AN ASSOCIATED PROJECT.
GA. SHARE$
50
0TH SHARE$
DADE 630915
STATUS:
SR 136 E/TRENTON EB 6.4-7.2/EB ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.05 MANAGER: BILL MCVEY DADE SGN 10-15-91 - UTIL; TRENTON SGN 10-ll-9r PUB UTIL:{:C::/::Oi
)~QNG or~';'):\~\
F~:i:~~#ilf: SURFACE T~i\6tW: FEDERAL HIGHWAY Al:>iuN.:FtiNoS
PE 1992
UNDERWAY
ROW 1995
$
147
CONST 1996 $ 1613
FED SHARE $ 1290
GA. SHARE $
323
0TH SHARE $
DADE 6Bl344
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE KISH
}\\fQNG DIST. 9 : j)j],})
FUND SOURdN:ktifuu. TRANSIT FEDERAL .T~SiT ADMIN
Pl!'J!!~TING 1995 $
23
FED SHARE$
14
GA. SHARE$
0TH SHARE$
9
DADE 681345
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE KISH
CONG DIS;'?\9
OPERATING 1996 $
25
FUND SOURCE: RURAt:::fffl~IT
FEDERAL TRANSIT AOM:tN FUNDS
FED SHARE$
15
GA. SHARE$
0TH SHARE$
10
COUNT.Y P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/F)' 1997
COMMENTS
FANNIN 630875
STATUS:
SR 60@ HEMPTOWN CRK/MINERAL BLUFF; @ YOUNG STONE CRK
REPLACEMENT OF THE EXISTING BRIDGES{$). NO ADDED LANES.
PROJECT MILEAGE : .36
MANAGER: BILL MCVEY
COUNTY & MINERAL BLUFF REFUSED 8/9l;D9't.
::i?AY 3-10-93
FANNIN 63Y875
STATUS:
etillt1 SR 60 @ REMMOWN CRK - FOR sTP
~:~~~ JJw.b: oo - o ~I~:~~~wi:
E X I s T f : ~ f .:.. - i ;
/PROPOSED
o
MANAGER: UNKNOWN
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS. 63Y875 IS AN ASSOCIATED PROJECT.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630875 IS AN ASSOCIATED PROJECT.
_22-Feb-1994 P,age 14
FISCAL YEAR
COST ESTS
PE 1988 UNDERWAY
ROW 1989
UNDERWAY
CONST_ 1995
$
611
FED SHARE $
489
GA. SHARE $
122
0TH SHARE $
PE 1988 UNDERWAY
ROW NONE
$
0
CONST 1995
$
209
FED SHARE $
167
GA. SHARE $
42
0TH SHARE $
FANNIN 670930
STATUS:
RESTORE MINERAL BLUFF:B!!!Mh
MI-SCELLANEOUS IMPROVEMENTS,/ ENHANCEMENT
PROJECT MILEAGE : oo - ixl$.,T. LANES: o /PROP01itiji:.mfs: o
MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT
CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE
$
0
CONST 1996
$. 128
FED SHARE$. 102
GA. SHARE$
0TH SHARE$
26
FANNIN 6B1_349
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH
DIST .9
OPERATING.1995
$
79
FOND SOURCE: RURAL ~RANSIT
FED sHARE $
46
.F-.E.D--.-E-B:;:.;:A:L TRANSIT-ADMIN FUNDS
GA. SHARE$
0TH SHARE$
33
FANNIN 6B1350.
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH
1996 $
02
FED SHARE$
48
GA. SHARE$
0TH SHARE$
34,
!$'ES!
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT. STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FLOYD 620590
STATUS:
SR 1/US 27 IN ROME FM 5TH AVE TO RECONSTRUCTION & WIDENING FROM PROJECT MILEAGE : .20 MANAGER: BFERGUSON FLOYD REFUSED ll-2-93;ROME SGN
ROME TIP f L-85-11
CONG DIST. 7 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 15
FISCAL YEAR
COST ESTS
PE 1994 ROW 1996 CONST
UNDERWAY
$
360
AFTER 97
FLOYD 621075
STATUS:
US 27@ ARMUCHEE & LITTLE REHAB. OF THE EXISTING ~~-~v=u PROJECT MILEAGE : .06 MANAGER: RAY METTS DOT TO PAY PER CHARLES
ROME TIP f L-89-8
CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS 621070 IS AN ASSOCIATED PROJECT.
PE 1992 UNDERWAY
ROW NONE
$
0
CONST 1995
$
725
FED SHARE $
580
GA. SHARE $
145
0TH SHARE $
FLOYD 621450
STATUS:
W ROME BP FM CR 638 CONSTRUCTION OF NEW PROJECT MILEAGE : 1.50 MANAGER: M GANNAWAY DOT TO FUND ROW & UTILITIES
ROME TIP f L-89-10 CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
CONST 1995 $ 3952
FED SHARE$ 3162
GA. SHARE$
790
0TH SHARE.$
FLOYD 621560
STATUS:
SR 53 FM MP 0.54 TO 14.15 [ BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: BILL MCVEY (M) FLOYD REFUSED 1-19-94; CAVE
DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FE,DERAL HIGHWAY ADMIN FUNDS
PE 1992
UNDERWAY
ROW 1996
$
44
CONST 1997
$ 1111
FED SHARE $
889
GA. SHARE $
222
0TH SHARE $
FLOYD 621690
STATUS:
SR 101 FM CR 740/CS 899 NORTH TO RECONSTRUCTION & WIDENING FROM 2 PROJECT MILEAGE : 1.84 MANAGER: J. GARLAND (M) SEND LGPA IN 1996
ROME \}CONG
Fmi;::1Btfil8: SURFACE Truiliffii6~f'.
FEDJ1:ttA:L,.iftGHWAY ADMIN\FUNDS '
PE 1994 ROW 1997 CONST
UNDERWAY $ 1150 AFTER 97
FLOYD 650410
STATUS:
DIVISION ST/ROME FM SHORTER AVE TO REDMOND RD/& REMOVE RR BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.04 MANAGER: J. GARLAND ROME SGN 4-15-91 ROW/UTIL EXCPT RR;CO SGN 4-23-91 ROW & UTIL
,{:::it~ TIP f
PE 1993 UNDERWAY
:::,::::::\CONG DIST.
ROW LOCL
iUND .,.,.,.,-::,:-:,:/tONST 1996 $
SOURciit:rnm&AcE TRANSPok4:J
FED SHARE $
1619 1295
FEDERAL ,,Jffi;ii(iiAy ADMIN
GA. SHARE $
324
0TH SHARE$
FLOYD 650460
STATUS:
SR 101 OVER ETOWAH RIVER IN ROME REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .00 MANAGER: D. SMITH (M) SEND LGPA IN 1995
ROME TI/>t. L-89-4 CONG. DIST. :7
FUND SOURCE: BRIQ~~}~:iih~RAM FEDERAL HIGHWAY ))~IN FUNDS
PE 1993 ROW 1996 CONST
UNDERWAY
$
405
AFTER 97
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 16
PROJECT LISTING BY COUNTY FY 1995/FY 1997
.COUNTY
DESCRIPTION
FISCAL
COST
F-L-PO-.YI-.-DN--O-.--M-A. Y-O-'S--B-A-R--L-O--CK-PR-A-ON-JED-C-TD-A-MD-A-TR-A-ES-T-O-R-A--T-IO-N--O-N----------------------------R-O-M-E.--T-CIPO-M--iM-E-6N-7T-S0-8-2-0-----------------------PEY--EA-LOR--C-L------E-ST--S--
670820 MISCELLANEOUS IMPROVEMENTS/
CONGDIST. 7
ROW LOCL
PROJECT MILEAGE : .00 - EXIST. LANES: 0
0
CONST 1995
$ 1450
MANAGER: MEG BRYSON
FUND SOURCE: TRANS. ENHANCE.
FED SHARE$ 1160
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE- $ ' 710
0TH SHARE$ 1000
FLOYD 670830
STATUS:
CLASS I BIKEWAY IN ROME BICYCLE/PED. FACILITY/ PROJECT MILEAGE : .00 MANAGER: MEG BRYSON TO BE DONE BY CONTRACT
ROME TIP f 670830
CONG DIST. 7
0 . FUND SOURCE: TRANS. ENHANCE.
FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996
$
465
FED SHARE $
372
GA. SHARE $
0TH SHARE $
93
FLOYD 6D6011
STATUS:
5 .TRANSIT BUSES, VAN,
TRANSIT PROJECTS/ FUNDS RECIPIENT: ROME MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 7
CAPITAL 1995
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS.
GA. SHARE$
0TH SHARE$
1116 8.93 112 112
FLOYD 6D6012
STATUS:
5 TRANSIT COACHES, TOW TRUCK, TRANSIT PROJt:CTS / CAPITAL FUNDS RECIPIENT:ROME TRANSIT SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE
FLOYD 6D6014
STATUS:
-
PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE
CAPITAL 1996
$
URBAN TRANSIT DISC.
FED SHARE$
ADM IN FUNDS .
GA. SHARE$
0TH SHARE$
1149 919 115 115
URBAN TRANS!i_ti()
ADMIN ftiNDif
1995
$
SHARE$
SHARE$
SHARE$
1184 213 213
1184
FLOYD 6D6015
STATUS:
PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 7
il~ FUND sou~9#\!\!l1 TRANSIT
FEDERAL!l'MNS!T ADMIN
:_OPERATING 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
1254
213 213 1254
FLOYD ELDERLY AND DISABLED VEHICLES AND EQUI~MENT 6Vl01l TRANSIT PROJECTS / CAPITAL-
- FUNDS RECIPIENT: AGENCIES IN .FLOYD MPO AREA
MANAGER: STEVE KISH
STATUS:
:,
. CONG DIST. :7
1995
$
24
ADMiN FUND SOURCE: ELDEfil'.f)f/~ISABLED ~~~TAL FED SHARE$
. FEDERAL TRANSIT
FUNDS
GA. SHARE$
19 3
0TH SHARE$
2
I>
~
lt~w.:~J
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 17
FISCAL YEAR
COST ESTS
FLOYD 6V1012
STATUS:
ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FLOYD MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1996
$
25
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
20
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
3
0TH SHARE$
3
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GILMER 621270
STATUS:
SR 282 EB FM MP 1.7 TO 3.4; ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.45 MANAGER: BILL MCVEY REQ GILMER DO UTILITIES 12-6-89.
9.95
CONG DIST. 9
FOND SOURCE: SURFACE TRANSPORT . FEDERAL HIGHWAY ADMIN FONDS
GILMER 631080
STATUS:
SR 52 LEFT TORN LANE@ SR 2 TORN LANES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: BILL MCVEY GILMER COUNTY SIGNED
UTILITIES.
CONG DIST. 9
4 FOND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FONDS 631090 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 18
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1994 UNDERWAY
CONST 1995
$ 1511
FED SHARE $ 1209
GA. SHARE $
302
0TH SHARE $
"
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
87
FED SHARE $
78
GA. SHARE $
9
0TH SHARE $
GILMER 631090
STATUS:
SR 2@ CARTECAY REHAB. OF THE EXISTING PROJECT MILEAGE : .13 MANAGER: BILL MCVEY GILMER COUNTY SIGNED
CONG DIST. 9
FOND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS 631080 IS AN ASSOCIATED PROJECT.
PE 1992
UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$
473
FED SHARE $
378
GA. SHARE $
95
0TH SHARE $
GILMER 631100
STATUS:
SR 282/ELLIJAY FM WEST OF SR 5 RECONSTRUCTION & WIDENING FROM PROJECT MILEAGE : 1.30 MANAGER: J. GRAYBEAL (C) ELLIJAY SGN 8-24-92. DOT WILL PAY GILMER
GILMER 631110
STATUS:
SR 52 EB FM MP 16.0-17.8; WB MP 18.8-20.17 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.17 MANAGER: BILL MCVEY REQ GILMER DO UTILITIES 7-30-91.
GILMER 631430
STATUS:
SR 2/SR 52@ MOONTAINTOWN CREEK 6.7 MI NW OF ELLIJAY REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .23 MANAGER: BILL MCVEY REQ GILMER COUNTY DO UTILITIES 10-6-93
DIST. 9
SOURCE: SURFACE TRANSPORT. HIGHWAY ADMIN FONDS
m:::o,]\
FONo:!BfAfdk: SURFACE T~J:tsl4': FEDEi.RAiUb:GHWAY A.DMINc::tiliios
wJ!!1::... ,
'\it&J~ SOORciJ :11~~:E FED~~ #l$i(OVAY
PE 1992
UNDERWAY
ROW 1994
$ 1620
CONST 1996
$ 2898
FED SHARE $ 2318
GA. SHARE $
580
0TH SHARE $
PE 1992
UNDERWAY
ROW 1995
$
210
CONST 1997
$ 1296
FED SHARE $ 1037
GA. SHARE $
259
0TH SHARE $
PE 1994
UNDERWAY
ROW 1995
$
10
1997
$
571,
FED SHARE $
457
GA. SHARE $
114
0TH SHARE $
GILMER 681354
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRAN.SIT FACILITIES / OPERATIONS FONDS RECIPIENT: GILMER MANAGER: STEVE KISH
CONG DIST. \9
FOND SOURCE: FEDERAL
OPERATING 1995
$
62
FED SHARE$
36
GA. SHARE$
0TH SHARE$
26
...
=ml
~
~
t.
\fl,.w,;:j
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 19
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
--------------------------------------------------------------------------------------------' ---------------' ------------------------
GILMER COUNTY OPERATED PUBLIC TRANSIT SERVICE
6B1355 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: GILMER
OPERATING 1996 $
64
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
37
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
27
COUNTY P. I.NO.
GORDON 610550
STATUS:
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
GORDON 610750
STATUS:
I-75 @ SR 156 IN CALHOUN
.c
INTERCHANGE / REC ST. OR REHAB ./{\,:::::c::,::
\/:'\.
PROJECT MILEAGE : . 30 - EXIST2 ,tANi!!S: 3 /PROPOSED IJili1iJS: 5
~A~~~O~NG~N~~~i'. 10-26f9i] &8b~N SGN PUB UTIL 2+;lj}94
CONG DIST. 9
FUND soURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
GORDON 610755
STATUS:
I-75 @ sR 225 N OF c.JJii8&iJ'/
INTERCHANGE / RECST. OR'REHAB.
/ : .: . :
PROJECT MILEAGE : .oo - EXIST. LANES: 6 /PROPosiri:t..@fs: 6
~~BKib' ~A~~~o:yD~E;~!Lic UTIL 'ia~fa6,,!l?; couw~r
CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
GORDON 610930
STATUS:
:I~~~: I-75 INTERCHANGE AT SR 136
INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSE;Q
6
MANAGER: GENE POWELL {M)
SEND LGPA IN 1997
FUND SOURCE: I-STATE MAINT. F~Q~R.M HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 20
FISCAL YEAR
COST ESTS
PE 199.?
UNDERWAY
ROW 1996
$
120
CONST 1996
$ 2291
FED SHARE $ 2062
GA. SHARE $
229
0TH SHARE $
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1996
$ 3298
FED SHARE $ 2968
GA. SHARE $
330
0TH SHARE $
PE 1992
UNDERWAY
ROW 1995
$
249
.CONST 1996
$ 1783
FED SHARE $ 1605
GA. SHARE $
178
0TH SHARE $
PE 1996 ROW 1997 CONST.
$
16
$
10
AFTER 97
GORDON 611000
STATUS:
I-75 REST
REST AREA *35 SEWER AREA/ MAINTENANCE
LINE
& HOOK
UP
TO
SE~k
SYSTEM
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES_f: 0 )/
MANAGER: J. GARLAND
NOT APPLICABLE
<rcoNG Disi~: rn=
I-STATE MAINT> ADMIN=:i!'tiNos
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1995
$
320
FED SHARE $
288
GA. SHARE $
32
0TH SHARE $
GORDON 620780
STATUS:
SR 3/US 41 FM S OF SR 156 N TO CALHOUN BYP IN CALHOUN RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.43 MANAGER: M GANNAWAY {M) SIGNED BY CITY OF CALHOUN 3-14-84 FOR UTILITIES
PE 1992
ROW 1997
=;&J6 .::::=.=:===
.. ;.-:,::,:-:-::tONST
souRctf!MtlkPAcE TRANSPORTS :>= =
FEo~:1baiAY ADMIN
UNDERWAY $ 4594 AFTER 97
GORDON 621365
STATUS:
SR 3/US 41/CALHOUN FM S OF AIRPORT TO SR 53/INCL BR CLVT EXT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. . PROJECT MILEAGE: 1.60 MANAGER: M GANNAWAY . {M) CALHOUN SGN DO UTIL 10-25-93;GORDON SG~ 10-21-93 UTILITIES
PE 1992 .UNDERWAY
ROW NONE
$
0
CONST 1996
$ 3693
FED SHARE $ 2954
GA. SHARE $
739
0TH SHARE $
~
l!l!!!!'!!!!!
~
~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GORDON 621510
STATUS:
SR 53@ CSX RR/FAIRMOUNT REPLACEMENT OF THE EXISTING BRIDGES{S). PROJECT MILEAGE : .00 MANAGER: BILL MCVEY REQ CO DO PUB UTIL 10-30-91;
LANES.
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
GORDON 621540
STATUS:
SR 53 waMp 14.67-15.S;EB MP ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.25 MANAGER: BILL MCVEY {M)
GORDON COUNTY SIGNED
GORDON 621545
STATUS:
SR 53@ PINE LOG REHABILITATION OF PROJECT MILEAGE : .00 MANAGER: BIL~ MCVEY {M) REQ GORDON COUNTY DO
GORDON 631290
STATUS:
SR 136 EB MP 10-11.3; WB MP ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.60 . MANAGER: BILL MCVEY (M) SEND LGPA IN 1996
UTILITITES.
CONG DIST. 9 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 621545 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FOND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621540 IS AN ASSOCIATED PROJECT.
DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FED.ERAL HIGHWAY ADMIN FUNDS
:-:-::;;::::::::::::::.:
22-Feb-1994 Page 21
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW 1994
UNDERWAY
CONST 1995 $ 1120
FED SHARE.$
896
GA. SHARE$
224
0TH SHARE$
PE 1992
UNDERWAY
ROW 1995
$
95
CONST 1997
$ 1086
FED SHARE $
869
GA. SHARE $
217
0TH SHARE $
PE. 1992
UNDERWAY
ROW NONE
$
0
CONST 1997
$
309
FED SHARE $
247
GA. SHARE $
62
0TH SHARE $
PE 1996 ROW 1997 CONST
$
50
$
77
AFTER 97
GORDON 631370
STATUS:
SR 136 CONN, EB MP 4.5 TO MP 5.8; WB MP 6.55 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.30
MANAGER: BILL MCVEY {M) SEND LGPA IN 1996
t:coNG DI_~ill\;'
,-:.:;::::::=:::::::-;
:.:;:;:;:-:-
FoNo:Jio~Bf = suRFAcE TR1iliJi8k4>
FEDim)aIGHWAY AOMIN':Foobs' :<.;-;.:.;,:
PE 1995 ROW 1997 CONST
$
33
$
30
AFTER 97
GORDON 650420
STATUS:
HILLHOUSE ST EXT/CALHOUN@ CSX RR-OR-HICKS ST EXT@ CSX RR BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: M GANNAWAY {M) SEND LGPA AFTER 1994 STIP IS APPROVED
'::/::::=ccoNG DIST. 9
~Wf: . ;~;; SOUR,t
SAFETY
FEDE;RAL.RXGH~AY ADMIN
PE 1996 $
16
ROW NONE $
0
:-:-::::::::,:,,:t::bNST 1996
$
522
FED SHARE$
470
GA. SHARE$
52
0TH SHARE$
GORDON 662510
STATUS:
UNION GROVE ROAD/CR 65 RELOCATION FM SR 3 TO SR 53 / CALHOUN CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 3.15 MANAGER: M GANNAWAY {M) SEND LGPA WHEN PROJECT IS ADDED TO CWP
CONG DIST .-c::9 FUND SOURCE: SURFiti!:)1fuuispoRT.
FEDERAL HIGHWAY Ju>MIN FUNDS
PE ROW LOCL CONST
$
200
AFTER 97
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 22
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
-P--. I-.-N-O-.---------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M--EN-T-S---------------------------Y-E-A-R--------E-S-T-S--
GORDON CR 473/FAIRVIEW RD @ LICK CREEK
-:\._
PE 1993 UNDERWAY
670730 REPLACEMENT OF THE EXISTING BRIDGES(S). ~0. ADDED LANES.
coNG DIST. 9
ROW LOCL
PROJECT MILEAGE : . 00
------
CONST 1995 $
97
FUND SOURCE: BRIDGE PROGRAM
FED SHARE $
78
STATUS: =t~!R~G:I~~ ~;~YUTILITIEs & NECEssrutf b~f6bRs 2-3-94
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
19
GORDON 670940
~!1r 1
COOSAWATTEE RVR TRAIL WITH LANDs.ifik11 ~::::::)
VATION
:!;~~~/:~~EA;!C~L~~~ ~ ~~~:rf~~~/; 0 /PROPOSED
0
CONG DIST. 9
0TH SHARE $
PE LOCL ROW LOCL CONST 1997
$ 1250
MANAGER: JANET HARVEY
.-::} ::
FUND SOURCE: TRANS. ENHANCE.
FED SHARE $ 1000
STATUS: LGPA TO BE DONE BY CONTRAT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
0TH SHARE $
250
GORDON 6Bl359
STATUS:
COUNTY OPERATED PUBLi8\4ki&sIT SERVICE TRANSIT FACILITIES/ OPEMTIONS FUNDS RECIPIENT: GORDON MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1995
$
56
FUND SOURCE: RURAL TRANSIT
FED SHARE $
32
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
24
GORDON 6Bl360
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT -FACILITIES /OPERATIONS FUNDS RECIPIENT: 'GORDON MANAGER: STEVE KISH
DIST. 9
FUND SOURCE: RURAL TRANSIT
OPERATING 1996
$
59
FED SHARE $
34
FED-.:-E--:-R:-:-AL .TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
25
GORDON 6C2360
STATUS:
ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPitNT: GORDON MANAGER: STEVE KISH LGPA NOT APPLICABLE
/)CONG DI~flrn
FUND_)ffej~dfu : FEDE.RA--:,::-l {:':TRAN S I T
1996
$
32
FED SHARE$
26
GA. SHARE$
3
0TH SHARE$
3
lll!!ffl!!
~
~
.. .
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HARALSON SR 120 BTWN BUCHANAN & DALLAS/PAULDING 621580 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 3.87 MANAGER: BILL MCVEY (M) STATUS: SEND LGPA IN 1997
.. 2 EB & 1 WB
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 23
FISCAL YEAR
COST ESTS
PE 1992 ROW 1997 CONST
UNDERWAY
$
243
AFTER 97
HARALSON CR 342/S-1618 FM SR 8/US
631140 MINOR WIDEN & RESURF / RECST;
PROJECT MILEAGE : 5.36 -
2
MANAGER: BILL MCVEY (M)
STATUS: REQ HARALSON DO UTIL
HARALSON SR 8 EB MP 15.8-17.3; 631170 ADDITION OF A PASSING
PROJECT MILEAGE : 2.20 MANAGER: BILL MCVEY STATUS: REVISED 1-29-92 REQ COUNTY
HARALSON SR 120, EB MP 1.36-2.82; WB 641920 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 3.32 MANAGER: BILL MCVEY (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP
HARALSON SR 1/US 27: OVER SOUTHERN RAILROAD IN 641950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: BILL MCVEY (M) STATUS: SEND IN 1996
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
DIST. 7
SOURCE: SURFACE TRANSPORT. HIGHWAY ADMIN FUNDS
Dis,1 Ii~
F~~::~6i6fu: BRIDGE P
FEDillihb:GHWAY ADMrn
RruO1:~fo~s
/
PE 1992
UNDERWAY
ROW 1995
$
296
CONST 1997
$ 2730
FED SHARE $ 2184
GA. SHARE $
546
0TH SHARE $
PE 1992
UNDERWAY
ROW 1995
$
274
CONST 1997
$ 1354
FED SHARE $ 1083
GA. SHARE $
271
0TH SHARE $
PE ROW CONST
$
64
AFTER 97
AFTER 97
PE 1995 ROW 1997 CONST
$
12
$
1
AFTER 97
HARALSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1364 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPI~NT: HARALSON MANAGER: STEVE KISH STATUS:
HARALSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1365 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HARALSON MANAGER: STEVE KISH STATUS:
t:JbNG
Ftfu'; :\:/:;:::::,:,:,,::_OPERATING 1995 $
souRci.tihm TRANSIT
FED SHARE$
64 38
FED~J:Uu,. :TRANSIT ADMIN
GA. SHARE$
0TH SHARE$
26
CONG DIST. \-7
OPERATING 1996
$
67
FUND SOURCE: RURAt/t'Mffi~IT FEDERAL TRANSIT .fu5M:tif FUNDS
FED SHARE$
40
GA. SHARE$
0TH SHARE$
27
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 24
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P .I.NO.
PROJECT DATA
---------------------------------------------------------------------------
------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-TS --
HARALSON ONE CONVERSION VAN WITH LIFT
6C2364- TRANSIT FACILITIES/ CAPITAL
CONG DIST. 7.
FUNDS RECIPIENT: HARALSON
CAPITAL 1995
$
32
MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE$
26
STATUS: LGPA NOT APPLICABLE
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
3
0TH SHARE$
3
<t
~
~
~
n.":'!!':~~
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
MURRAY 620399
STATUS:
SR 52 @ L&N RR REHABILITATION OF THE PROJECT MILEAGE : .17 MANAGER: BILL MCVEY NOTHING SENT
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
MURRAY 621260 .
STATUS:
SR 282 RELOCATION FM SR 61/US CONSTRUCTION OF NEW ROUTE PROJECT MILEAGE : .67 MANAGER: BILL MCVEY
MURRAY COUNTY SIGNED
UTILITIES.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MURRAY 621265
STATUS:
SR 282/US 76 EB FM ADDITION OF A PASSING PROJECT MILEAGE : 2.35 MANAGER: BILt MCVEY REV REQ CO DO ROW/UTIL
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
MURRAY 621731
STATUS:
SR 2/SR 61@ SUMAC CREEK REHAB. OF THE EXISTING BRIDGE(S). PROJECT MILEAGE : .00 MANAGER: J. GRAYBEAL (M) SEND LGPA IN 1996
DIST. 9
FUND SOURCE: BRIDGE PROGRAM .F:EDERA-::L-::::..-HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 25
FISCAL YEAR
COST ESTS
PE 1980 UNDERWAY
ROW 1995
$
114
CONST 1997
$
606
FED SHARE $
485
GA. SHARE $
121
0TH SHARE $
PE 1992 UNDERWAY
ROW 1995
$
51
CONST 1996
$ 2829
FED SHARE $ 2263
GA. SHARE $
566
0TH SHARE $
PE 1992 UNDERWAY
ROW 1995
$
35
CONST 1996
$ 1013
FED SHARE $
810
GA. SHARE $
203
0TH SHARE $
PE 1996 ROW 1997 CONST
$
24
$
5
AFTER 97
MURRAY 641970
STATUS:
SITTON ROAD AT SR 52 ALT. IN CHATSWORTH TURN LANES/ SAFETY PROJECT MILEAGE : 30 - EXIST. LANES: 2 /PROPOSED LANES,f\3/'}/ MANAGER: BURT RIDDLE CO SGN ROW, UTIL 7-6-93; OTO
<::::;::-:-:::.
:::::::::
FUNo)so~t: HWY. ; ~AFE:':1:t/@ ? ' '
FEDERAL HIGHWAY ADa:I:N':!;QNbS
MURRAY 670701
STATUS:
CR 23/LOUGHRIDGE RD@ MILL CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: BILL MCVEY MURRAY CO SGN ROW, UTILITIES & NECESSARY DETOURS 11-18-9.1.
iifuri <,
souMi'fi?hiHDGE PROGRAM
FEDERAL <itfdk#AY ADM IN
MURRAY 670780
STATUS:
CR 299 OVER EMERY/HOLLY CREEK BRIDGES/ REPLACEMENT PROJECT MILEAGE : . 00 MANAGER: BILL MCVEY (M) MURRAY REFUSED TO DO ROW, UTIL AND DETOURS 1-18-94
CONG DIST. \9
FUND SOURCE: FED FEDERAL HIGHWAY
PE 1994 UNDERWAY
ROW LOCL
.CONST 1995
$
275
FED SHARE $
248
GA. SHARE $
28
0TH SHARE $
PE 1993 UNDERWAY
ROW LOCL
1995
$
228
FED SHARE $
182
GA. SHARE $
46
0TH SHARE $
PE 1995
$
5
ROW LOCL
CONST 1997
$
463
FED SHARE $
463
GA. SHARE $
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 26
PROJECT LISTING BY COUNTY FY 1995/FY 1997
, COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
------------------------------------------------------------------------------------------------------
-----------Y-E-A-R---------E-ST-S---
MURRAY COUNTY OPERATED PUBLIC TRANSIT SERVICE
6Bl369 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: MURRAY
OPERATING 1995 $
70
MANAGER: STEVE KISH
FUND SOURCE: ,RURAL TRANSIT
FED SHARE$
41
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
29
MURRAY 6Bl370
STATUS:
COUNTY OPERA~ED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: MURRAY MANAGER: STEVE KISH
CONG DIST. 9
OPERATING 1996 $
73
FUND SOURCE: RURAL TRANSIT
FED SHARE$
43
FEDERAL TRANSIT ADMIN FUNDS
GJI,. SHARE $
0TH SHARE$
30
~
~
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
PAULDING SR 61/DALLAS @ SOUTHERN RR
?:=:.
620834 REPLACEMENT OF THE EXISTING BRIDGES(S). tR.OM 2 TO 3 LANES.
PROJECT MILEAGE : .38.
MANAGER: BILL MCVEY
STATUS: SIGNED BY CITY OF DALLAS 9/30/87 FOR of:ttttfls
CONG DIST. 7
FOND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PAULDING SR 92@ LICK LOG CREEK
621020 REHAB. OF THE EXISTING
PROJECT MILEAGE : .50
MANAGER: BIL!.. MCVEY
. :)\}:=})
STATUS: SIGNED BY COUNTY 6-25-85 ......&.....::H.:I:RA.M 7-1-85 FOR OTILITI~:-f:-:a- /}:
PAULDING SR 92 @ SCL kR
-:-:-:-:-:-:-:-:-:-
:/
621022 REHAB. OF THE EXISTING BRlPGE(S). FROM 2 LANES TdisiJfuEs.
PROJECT MILEAGE : .00
MANAGER: BILL MCVEY (M)
..... .
STATUS: UNDER #621020--CITY/HIRAM SGN'
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS
22-Feb-1994 Page 27
FISCAL YEAR
COST ESTS
PE 1992 UNDERWAY
ROW 1995
$ 1175
CONST 1996
$ 1308
FED SHARE $ 1046
GA. SHARE $
262
0TH SHARE $
PE 1986 UNDERWAY
ROW 1988 UNDERWAY
CONST 1995
$
554
FED SHARE $
443
GA. SHARE $
111
0TH SHARE $
PE 1993 ROW 1997 CONST
UNDERWAY
$
9
AFTER 97
PAULDING SR 120 FM SR. 6/0S 278 NE TO THE COBB CO LINE 621150 RECONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE : 4.17 MANAGER: J. GARLAND STATUS: COUNTY SIGNED TO DO UTILITIES 2-20-87
PAULDING SR 61/DALLAS FM SR 120 CONN TO SR 6/0S 278 621570 RECONSTROCTibN & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.20 MANAGER: J. GARLAND (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP
DIST. 7 FOND SOURCE: SURFACE TRANSPORT. FED::.::E:::R:::;A=L. HIGHWAY ADMIN FONDS
:::{CONG
~~::J86k@t: NAT'L HIGH#.A'.QJ/t: ii.HIGHWAY
PE 1992 UNDERWAY
ROW 1992 UNDERWAY
CONST 1997
$ 9478
FED SHARE $ 7582
GA. SHARE $ 1896
0TH SHARE $
PE ROW CONST
$
59
AFTER 97.
AFTER 97
PAULDING SR 120@ 3 LOC IN HARALSON & PAULDING co . . . SEE HARALSON 62158X ADDITION OF A PASSING LANE.
PROJECT MILEAGE : .00 MANAGER: UNKNOWN
STATUS:
' {'c~:)NG DIST.
FUND sooRci{{MH&AcE TRANSPci;Jt
PE 1992 ROW 1997 :::::=,=:=coNST
!~~~forr:tl~!!s~~!~E~o:~~dif;ff\>
UNDERWAY
$
0
AFTER 97
PAULDING SR 61 NB 15.0-16.7;NB 17.6-19.6/PAOLDING;SB 22.9-0.87/BARTOW 621680 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 5.67 MANAGER: BILL MCVEY (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP
CONG DIST .=\7
ADMIN FUND SOURCE: suRFitl\JfullispoRT.
FEDERAL HIGHWAY
FUNDS
PE ROW CONST
$
102
AFTER 97
AFTER 97
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
PAULDING SR.61 FM WIXS DR/CR 245 TO DALLAS-NEBO 621750 RECONSTRUCTION & WIDENiNG FROM 2 LANES
PROJECT MILEAGE : 1.79
MANAGER: J. GARLAND {M) STATUS: SEND LGPA WHEN PROJECT IS
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 28
FISCAL YEAR
.COST ESTS
PE ROW CONST
$
90
AFTER 97
AFTER 97
PAULDING SR-92 AT SR 120 CONNECTOR
641980 TURN LANES/ SAFETY
.
PROJECT MILEAGE: .00 -
MANAGER: BILL MCVEY (M)
STATUS: CONTACT TRAFFIC
PAULDING SR 61 AT SR 120 642030 INTERSECTION
PROJECT MILEAGE MANAGER: UNKNOWN STATUS: SEND LGPA IN 199
PAULDING CITY OF DALLAS HISTORICAL DISTRICT 670920 SIDEWALKS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: STEVE YOST STATUS: LGPA TO BE DONE BY CONTRACT
PAULDING COUNTY OPERATED PUBLIC TRANSIT SERVICE' 6B1374 : TRANSIT FACILITIES / OPERATIONS
FUNDS RECIPIENT: PAULDING MANAGER: STEVE KISH STATUS:
PAULDING COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1375 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: PAULDING MANAGER: STEVE KISH
STATUS:
CONG DIST. 7
0
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS
PE 1994': UNDERWAY.
ROW NONE
$
0
CONST 1995
$
289
FED SHARE $
260
GA. SHARE $
29
0TH SHARE $
CONG DIST. 7 4
_FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS'.
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS.....,
PE 1994
$
8
ROW 1995
$
11
CONST 1996
$
255
FED.SHARE $
230
GA: SHARE $ '.
26
0TH SHARE $'
['
PE LOCL
ROW NONE
$
0
CONST 1997
$
94
FED SHARE $
75
GA. SHARE $
0TH SHARE $
-19
}CONG Disi:
kB&khf: > FUN~<
--.OPERATING.1995. $
RURAL TRANSi4} =
FED SHARE. $
56 32
FEQJ.a:l.lA.t/T~SIT AD~rn::fo~os
GA. SHARE,$.
0TH SHARE$
24
:rr~bNG DIST. 1_
;{fu\; souRcili:tldfu
FEDERAL -TRAMSiT .
,1996. . $ _., 58 FED, SHARE $ . 33 GA. SHARE $.
0TH SHARE$
., ,.
~
~
~
r:-:m.,r,m
,............,.
COUNTY P, I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
PICKENS 621590
STATUS:
SR 53: WB MP 22.6-24,06; EB ADDITION OF A PASSING LANE. PROJECT MILEAGE : 4.40 MANAGER: BILL MCVEY (M) SEND LGPA WHEN PROJECT IS ADDED
26.48-28.42
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 29
FISCAL YEAR
COST ESTS
PE ROW CONST
$
88
AFTER 97
AFTER 97
PICKENS 621640
STATUS:
SR 53 EB MP 7.25-8.4; WB MP ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.70 MANAGER: BILL MCVEY (M) SEND LGPA IN 1995
PICKENS 621830 STATUS:
SR 53 AT SPRING INTERSECTION TM1on,"\'\n~M1~"~/ .
PROJECT MILEAGE : .00 MANAGER: BURT RIDDLE CONTACT TRAFFIC OPERATIONS
PICKENS 6B1379
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PICKENS MANAGER: STEVE KISH
PICKENS 6B1380
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACitITIES / OPERATIONS FUNDS RECIPIENT: PICKENS. MANAGER: STEVE KISH
CONG DIST. 9 - FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW 1996 $ 278 CONST 1997 $ 1240
FED SHARE $ 992 GA. SHARE $ 248 0TH SHARE $
PE NONE $
0
ROW 1996 $
1
CONST 1997 $
40
FED SHARE$
40
GA. SHARE$
0TH SHARE$
DIST. 9
OPERATING 1995 $
69
FUND SOURCE: RURAL TRANSIT
FED SHARE$
41
FEDERAL TRANSIT ADMIN FUNDS
:::.:;::::::.:=:::::_.
GA. SHARE$
0TH SHARE$
28
1996 $
72
FED SHARE$
42
GA. SHARE$
0TH SHARE$
29
COUNTY P ,I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
POLK 620645
STATUS:
SR 6 FM OLD CEDARTOWN RD/CR 193 E TO RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : 6.27 MANAGER: OAY METTS (CM) SEND LGPA IN 1997
IN ROCKMART LANES.
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 30
FISCAL YEAR
COST ESTS
PE 1992 ROW 1995 CONST
UNDERWAY $ 6500 AFTER 97
POLK 620647
STATUS:
SR 6 FM CR 154 RECONSTRUCTION & WIDENING PROJECT MILEAGE : 4.60 MANAGER: RAY METTS (CM) SEND LGPA IN 1997
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDE~ HIGHWAY ADMIN FUNDS
PE 1992 ROW 1995 CONST
UNDERWAY
$
892
AFTER 97.
POLK 621420
STATUS:
SR 113 FM ROCKMART RECONSTRUCTION & PROJECT MILEAGE : 5.50 MANAGER: M GANNAWAY (C) CITY SGN 6/91 P UTIL IN
CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 ROW 1995 CONST
UNDERWAY
$ 2006 AFTER 97
POLK 62143X' STATUS:
SR 113 FM TA1LORSVILLE CL TO CR 31/STILESBORO . SEE
RECONSTRUCTION & WIDENING. NO LANE ADDITION
,,;;~"-,/i'i,,,,-
PROJECT MILEAGE : .00
MANAGER: M GANNAWAY
POLK 621470
STATUS:
SR 1/US 27 OVER CEDAR CREEK-NEAR CEDARTOWN REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5
PROJECT MILEAGE : .21 MANAGER: J. dRAYBEAL REQ POLK DO UTILITIES UNDER #621320,_ 6-26-89.
POLK 621475
STATUS:
SR 1/US 27: BRIDGE OVER CEDAR CREEK TRIBUTARY SE CEDARTOWN REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .00 MANAGER: J. GRAYBEAL LGPA COVERED BY i621470
POLK 631280
STATUS:
CR 439/LIME BRIDGE ROAD OVER McCURRY CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER: BILL MCVEY POLK COUNTY SGN 7-7-92 ROW, UTILITIES & DETOURS
DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62f'436=ls AN ASSOCIATED PROJECT.
PE 1993 ROW 1996 CONST
UNDERWAY
$
0
AFTER 97
PE 1993 UNDERWAY.
ROW NONE
$
0
CONST 1997
$
283
FED SHARE $
226
GA. SHARE $
57
0TH SHARE $
PE 1993. UNDERWAY
ROW NONE
$
0
:CONST 1997
$
133
FED SHARE $
106
GA. SHARE $
27
0TH SHARE $
CONG DIST. \:7
FUND souRcE: BRID6t\libGRAM
FEDERAL HIGHWAY JiliMbf FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST f997
$
15
FED SHARE$
12
GA. SHARE$
3
0TH SHARE$
~
11!:'lffl
~
~
~
~
i.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
POLK 641!l80
STATUS:
SR lBUS. FM PLANTATION AVE TO SOUTH OF g;DERTOWN BYPASS TURN LANES/ SAFETY PROJECT MILEAGE : 1.08 - EXIST. LANES: 2 ::/fROPOSED LANES: 3 MANAGER: BILL MCVEY SEND LGPA IN 1995
CONG DIST. 7 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
POLK 670540
STATUS:
11
LlWt$. CR 450/N CAVS SPRING ST/CEDARTOWN:ji~ : ll!:ER CRK
RPREPOLJAECCETMMENILTEAOGFETH: E E1X7 ISTING BR....t.P.....G. "..i.!:,.$. Jsj . NO ADDED
MANAGER: BILL MCVEY
..,:/:(:{\?):/
CEDARTOWN SIGNED 8-12-85,Jtp~)~O,W AND UTILITIES
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 31
FISCAL YEAR
COST ESTS
PE 1994 UNDERWAY
ROW 1995
$
5
CONST 1996
$
435
FED SHARE $
435
GA. SHARE $
0TH SHARE $
PE 1994 UNDERWAY
ROW LOCL
CONST 1995
$
210
FED SHARE $
168
GA. SHARE $
42
0TH SHARE $
POLK 670676
STATUS=
CR 6/LAKE cRtEK RD@ AkE/cREEK REPLACEMENT OF THE EXISTi~G BRIDGES(S). NO PROJECT MILEAGE : .25 PMOALNKAGcEoR: SIBGINLELDMFCOVREYRow, UTii'.!Ef'
...,.,.,,.,.,.,.,,.,,,.,,. .,.,.,.,.,.
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1991 UNDERWAY
ROW LOCL
CONST 1995
$
321
FED SHARE $
257
GA. SHARE $
64
0TH SHARE $
POLK 670900
STATUS:
OLD CSX RAILROAD CORRIDOR FROM CEDARTOWN BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT
DIST. 7
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
;:::;:;..
PE LOCL
ROW 1997
$
28
CONST 1997
$
407
FED SHARE $
326
GA. SHARE $
6
0TH SHARE $
87
POLK 6Bl418
STATUS:
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF CEDARTOWN MANAGER: STEVE KISH
+ ){CONG DIS!iiI
.OPERATING 1995 $
30
F~:~::'18~dk: RURAL. TRANS:t:)
FEDE:iUJ):iRANSIT ADMIN}FONOS
FED SHARE$
17
GA. SHARE$
0TH SHARE$
13
POLK 6B1419
STATUS:
CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPigNT: CITY OF CEDARTOWN MANAGER: STEVE KISH
o:g;NG DIST. 7./f)}},,/
.,;gi;; SOURc:ifi(K6fu TRANSIT
FEDERAL ff::u-:.:-:i-:-l:,:i:-;,s iT ADMIN
1996 $
32
FED SHARE$
19
GA. SHARE $
0TH SHARE$
14
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WALKER 621192
STATUS:
CHICKAMAUGA BYP FM N LYTLE RD/CR 710 TO,:JJS 27 @SR 2/CATOOSA CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 4.60 MANAGER: M GANNAWAY REQ CATOOSA UTIL 2/9l;WALKER
CHATTANOOGA TIP f 1
CONG DIST. 9 GRIP PROJECT FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS 62Yl92 IS AN ASSOCIATED PROJECT.
:~~~
STATUS:
hi~Bttf~> . :H~iLiT~~i~Nc~E~HE EXISTING
NO ADDED :)fLEs.
PROJECT MILEAGE : .10
MANAGER: BILL COUNTY SIGNED
MCVEY 12-1-87
FOR tBKfri:2
UTILITIES
ONLY
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
WALKER 631440
STATUS:
SR 1 AT LEE/GORDON M:d:it 'i~8AD
!!;~; ,i~~~~Y: . oo -
MANAGER: BURT RIDDLE
CONTACT TRAFFIC OPERATIONS
LANES: o /PROPO$iJ filillfs: o
CHATTANOOGA TIP f 21
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
WALKER 641810
STATUS:
SR 1/US 27 FM EXIST 5 LANE NEAR CR 215 TO.. CHIT-CHAT_ i'fE>)Lss
TURN LANES /'SAFETY
PROJECT MILEAGE : 34 - EXIST. LANES: 4 /PROPOSEp)illffiff: 5
MANAGER: BILL MCVEY
COUNTY SGN 2-1-91 UTIL, ROW, DCL
T&S
}(CHATTANOOGA TIP t 4
,:r:::::: )<':ONG DIST. 9 GRIP PROJECT
FUND SOURCE: SURFACE TRANSPORT. FE;-;-D;.:--.:ERA..L,.. HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 32
FISCAL YEAR
COST ESTS
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 18060 13545 .
4515
PE 1988
UNDERWAY
ROW 1990 UNDERWAY
CONST 1996
$
250
FED SHARE $
200
GA. SHARE $
50
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST 1996
$
64
FED SHARE $
51
GA_- SHARE $
13
0TH SHARE $
PE 1993 UNDERWAY
ROW 1995
$
100
CONST 1996. $
363
FED SHARE $
290
GA. SHARE $'
73
0TH SHARE $
WALKER 641960
STATUS:
SR 193 OVER WEST CHICKAMAUGA CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: BILL MCVEY (M) SEND LGPA IN 1995
FUNr/i!Bi:mEt: BRIDGE PRosi'&M?; FED.IiliAbdhGHWAY
PE 1994
UNDERWAY
ROW 1995
$
1
CONST 1995
$
157
FED_ SHARE $
126
GA. SHARE $
31
0TH SHARE $
WALKER 650490
STATUS:
MCFARLAND AVE AT WEST LAKE, MAPLE, JAMES ST & REVERSE LN SIGNALS/ SAFETY PROJECT MILEAGE: 1.44 - EXIST. LANES: 3 /PROPOSED LANES: 3 MANAGER: BURT RIDDLE REQ ROSSVILLE DO UTIL 11/93; WALKER=NO UTIL INVOLVED 11/93
PE 1994
UNDERWAY
ROW NONE
$
0
FtiNo -:- ---.-:- ----.--:-:-:-:::::=:=:::;:::::toNST 19 9 5
$
souRcfi\i!Hl~AcE TRANSPORT/ .:
FED
.-: : ; WAY ADMIN
FED SHARE $ GA. SHARE $
350 280
70
0TH SHARE $
WALKER. 6B1384
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS"'RECIPIENT: WALKER MANAGER: STEVE KISH
CONG DIST. \9
OPERATING 1995
$
61
AD~IN FUND SOURCE: RuRAfi1'ilisIT
FEDERAL TRANSIT
FUNDS
FED SHARE$
35
GA. SHARE$
0TH SHARE$
26
. ...
~
~
~
~
~
COUNTY P.I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WALKER 6B1385
STATUS:
COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
WALKER 6C2384
STATUS:
ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
WALKER 6C2385
STATUS:
TWO CONVERSION VANS TRANSIT FACILITIES/ FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
22-Feb-1994 Page 33
FISCAL YEAR
COST ESTS
OPERATING 1996
$
65
FED SHARE $
37
GA. SHARE $
0TH SHARE $
.28
CAPITAL 1995
$
29
FED SHARE $
23
GA. SHARE $
3
0TH SHARE $
3
CAPITAL 1996
$
57
FED SHARE $
46
GA. SHARE $
5
0TH SHARE $
6
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY. 1995/FY 1997
COMMENTS
WHITFIEL I-75 & SR 3 CONN FM CR 91 E TO DUG GAP IW E/I-75
610690 INTERCHANGE / RECST. OR REHAB.
\\.
PROJECT MILEAGE : . 38 - EXIST. LANES: 2 /PilOPOSED LANES: 6
MANAGER: RAY METTS (C)
......
if2~P9lb STATUS: WHITFIELD COUNTY SIGNED FOR UTHITIES .
;,..
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
WHITFIEL I-75@ SR 3/US 41/ROCKY 610760 INTERCHANGE/ RECST. OR
PROJECT MILEAGE : .00 MANAGER: J. GARLAND (M) STATUS: SEND LGPA IN 1996
'tJiliES: 4 /PROPOSED ~ES: 6
i{ ~:;~:EL ::i~~~tt?;~:J~hir~:~c: :::oposi' 6
MANAGER: RAY METTS (M)
j\.,.
STATUS: SEND LGPA WHEN PROJECT IS ADDED
CONG DIST. 9 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 34
FISCAL YEAR
COST ESTS
PE 1992
UNDERWAY
ROW 1995
$
100
CONST 1996 $ 2528
FED SHARE $ 2022
GA. SHARE $
506
0TH SHARE $
PE 1995 ROW 1997 CONST
$ 250
$
250
AFTER 97
PE 1995 ROW 1996 CONST
$
16
$
10
AFTER 97
WHITFIEL I-75 RAMP AT SR 201 610900 RAMP/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST .. LANES: 6 MANAGER: RAY METTS (M) STATUS: SEND LGPA IN 1997
DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW 1996 CONST
$
4
$
10
.AFTER 97.
WHITFIEL SR 3/US.41 FM N OF STONECREST DR N TO CR 620960 RECONSTRUCTION &wIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: 2.90 MANAGER: J. GARLAND STATUS: WHITFIELD SGN 7/,11/89 TIL. REQ TUNNEL HILL 6-20-89
WHITFIEL SR 71 FM CR 228/WILLIAMS RD TON OF CR 213/677 620970 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: 4.30 MANAGER: J. GRAYBEAL (M) STATUS: WHITFIELD SIGNED 5-30-89 FOR UTILITIES.
WHITFIEL SR 71 FM N OF CR 213/677 NORTHERLY, TO CR 19/COHUTTA 620975 RECONSTRUCTION & WIDENING F~OM 2 LANES TO 5.LANES.
PROJECT MILEAGE: 4.10 MANAGER: J. GRAYBEAL STATUS': WHITFIELD CO SGN 5-30-89 UTIL;REQ COHUTTA DO UTIL 11-1-88 .
o:sBfra;it: SURFACE TRJi:tai+:
}1tIGHWAY JU)~l:~ i~J:>S
PE 1992
UNDERWAY
ROW 1993
UNDERWAY
CONST 1996 . $ 6246
FED.SHARE $ 4997
GA. SHARE $ 1249,
0TH SHARE $
FUND souRctl: ibfu.AcE
FEDERAL .itfoit#J{y
PE 1992
UNDERWAY
ROW 1993
UNDERWAY
:,:::::coNST f997
$ 5266
FED SHARE $ 4213
GA. SHARE $ 1053
0TH SHARE $
CONG DIS=:::\:9 FUND souRcE: suRFii::fu\t'fuspoRT.
FEDERAL HIGHWAY Al'.i~IN FUNDS
PE 1992 UNDERWAY
ROW 1993 UNDERWAY
.CONST 1997
$ 4059
FED SHARE$ 3247
GA. SHARE$
812
0TH SHARE.$
~
~
I'
"
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
WHITFIEL SR 71 FM NORTH BYPASS N TO DAWNVILLE 621290 RECONSTRUCTION & WIDENING FROM 5 LANES
PROJECT MILEAGE : 1.32 MANAGER: M GANNAWAY STATUS: REQ DALTON DO UTILITIES 9-20-92;
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
WHITFIEL SR 52 FM SR 52 BUS TO CR 112
621300 RECONSTRUCTION & WIDENING PROJECT MILEAGE : .65 MANAGER: BILL MCVEY
STATUS: WHITFIELD COUNTY SIGNED
UTILITIES.
CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
WHITFIEL SR 52 FM I-75 TO SR 621800 RECONSTRUCTION & MTl~~~TT
PROJECT MILEAGE : 1.80 MANAGER: BILL MCVEY (M) STATUS: SEND LGPA WHEN PROJECT IS
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 35
FISCAL YEAR
COST ESTS
PE 1992 ROW 1996 CONST
UNDERWAY $ 4479 AFTER 97.
PE 1992
UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$ 1439
FED SHARE $ 1151
GA. SHARE $
288
0TH SHARE $
PE 1996 ROW CONST
$
85
AFTER 97
AFTER 97
WHITFIEL SR 201 EB MP. 13.6-14.9; WB MP 631250 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 3,40 MANAGER: BILL MCVEY (M) STATUS: SEND LGPA IN 1995
WHITFIEL SR 3/US 41 FM CR 306 TO SB I-75 RAMPS IN 631360 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.28 MANAGER: RAY METTS (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP
DIST. 9 FUNDSOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
Disdi 1/i::~
FUNoJ~;qi&k: suru:N,$ T~ijJSM<
FEDllltAl{/iiIGHWAY ADMIN\FUNDS
PE 1992
UNDERWAY
ROW 1996
$
276
CONST 1997
$ 3747
FED SHARE $ 2998
GA, SHARE $
749
0TH SHARE $
PE ROW CONST
$
173
AFTER 97
AFTER 97
WHITFIEL SR-3; 7 CULVERT EXTENSIONS FM MP 0.18 TO MP 5.36 631380 BRIDGES/ SAFETY
PROJECT MILEAGE : 5.18 MANAGER: BILL MCVEY STATUS: COUNTY REFUSED TO COMMIT FUNDS 2-8-94
\}:f;pNG DIST.
;JJri sou~c:::iffijWf. SAFETY
FEbE-:R:::::,A:-:, L""".'.;;:i;:i::l;:G::::::H::::=W:::;AY ADMIN FUNDS
WHITFIEL PEDESTRIAN/BIKE PATHS AND LANDSCAPING IN DALTON 670890 BICYCLE/PED. FACILITY/ ENHANCEMENT.
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: CORA COOK STATUS: LGPA TO BE DONE BY CONTRACT
CONG DIST. \9 FUND SOURCE= TRANlniimANCE.
FEDERAL HIGHWAY MM:tN FUNDS -:::::::;:-.-:,:-:;:-:-
PE 1993
UNDERWAY
ROW 1995
$
32
.,:,::'='(CONST 1997
$
470
FED SHARE $
423
GA. SHARE $
47
0TH SHARE $
PE 1996
$
59
ROW 1996
$
188
CONST 1996
$
480
FED SHARE$
384
GA. SHARE$
50
0TH SHARE$
146
GEORGIA DEPARTMENT OF TRANSPORTATION -
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 36
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
-P--.I-.-N-O--. -----------
PROJECT DATA
COMMENTS
YEAR
ESTS
.-------------------------------------------------------------. -------------------------------------------------
WHITFIEL COUNTY OPERATED PUBLIC TRANSIT SERVICE
6Bl389 TRANSIT FACILITIES/ OPERATIONS
CONG DIST. 9
FUNDS RECIPIENT: WHITFIELD
OPERATING 1995
$
176
-MANAGER: STEVE KISH
FUND SOURCE: RURAL TRANSIT
FED SHARE $
106
STATUS:
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
70
WHITFIEL COUNTY OPERATED PUBLIC TRANSIT 6B1390 TRANSIT FACILITIES/
FUNDS RECIPIENT: WHITFIELD MANAGER: STEVE KISH STATUS:
CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
OPERATING 1996
$
185
FED SHARE $
111
GA. SHARE $
0TH SHARE $
74
WHITFIEL ONE CONVERSION VAN
VAN
6C2389 . TRANSIT FACILITIES
FUNDS RECIPIENT:
MANAGER: STEVE KISH
STATUS: LGPA NOT APPLICABLE
CONG DIST. 9
CAPITAL 1995
$
49
FUND SOURCE: RURAL TRANSIT
FED SHARE $
39
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
5
0TH SHARE $
5
.
,, .
.. ~ ..... ~.v,,p
l!!e'ffl
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 1
FISCAL YEAR
COST ESTS
ALL 770391
STATUS:
LUMP SUM: REMAINDER OF THE METRO SIGNALS/ SAFETY PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE
SYSTEM LANES: 0
ATLANTA TIP f R 98 CONG DIST. 5 & 4
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PENONE $ ROW 1995 $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
100 4435 3548
887
ALL 7C2513
STATUS:
TWO CONVERSION VANS (l WITH A TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: GEORGIA ~~.t(':}('/)': MANAGER: STEVE KISH FOR USE IN RURAL AREAS
CONG DIST. 5
CAPITAL 1995
$
80
FUND SOURCE: RURAL TRANSIT
FED SHARE$
64
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
16
0TH SHARE$
ALL 7C2514
STATUS:
TWO CONVERSION VANS TRANSIT FACILITIES/ FUNDS RECIPIENT: MANAGER: STEVE KISH FOR USE IN RURAL AREAS
CONG DIST. 5
CAPITAL 1996
$
81
FUND SOURCE: RURAL TRANSIT
FED SHARE$
65
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
16
0TH SHARE$
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CLAYTON 712425
STATUS:
I-75 FM SR 3/US 41/0LD DIXIE HWY TO RECONSTRUCTION & WIDENING FROM 4 LANES PROJECT MILEAGE: 2.90 MANAGER: J. GRAYBEAL (M) SEND LGPA WHEN PROJECT IS
ATLANTA TIP t CL-R 11
CONG DIST. 3
FUND SOURCE: NAT.' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 2
FISCAL YEAR
COST ESTS
PE 1996 ROW CONST
$ 1000 AFTER 97 AFTER 97
CLAYTON 712630
STATUS:
I-75/MORROW@ SR 54. (INCL INTERCHANGE/ RECST. OR PROJECT MILEAGE : .00 MANAGER: J. GRAYBEAL(CM)
COUNTY SGN FOR PUB UTIL "'',,,c/,;.
ATLANTA TIP t CL-R 31 CONG DIST. 3
8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1997 CONST
UNDERWAY
$
53
AFTER 97
CLAYTON 712970
STATUS:
HOV LUMP SUM SIGNING
HOV LANES/ SAFETY PROJECT MILEAGE : .00 MANAGER: BURT RIDDLE NOT APPLICABLE
ATLANTA TIP t R 73 .CONG DIST. 5
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS 71297Z IS AN ASSOCIATED PROJECT.
CLAYTON . I-675, I-75, I-20: IMPACT ATTENUATORS&BARRIER WALL .i\'.f::@\\
~!~i~~~~Es: 713050 ;:;~~/!i~:i~~T~R~o~
o /PROPOSEP~~[; o
MANAGER: BURT RIDDLE
STATUS: NOT APPLICABLE
}ATLANTA TIP t R 130
CCcl//C::ONG DIST. 3 & 5
"ecFUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
i t CLAYTON . I-75, I-85, I-20, I-285 & I-675 @ VARIOUS LOC METRO ATL
\g]) 713070
GUARDRAIL/ MAINTENANCE PROJECT MILEAGE : 34.00
EXIST. LANES: 0 /PROPOSED LANl!:~1
MANAGER: L. SEABROOK
STATUS: NOT APPLICABLE. '
ATLANTA T!19t R 130
5
CONG DI!>'.rf FU;i}awJt: I-STATE MAMt
FEDEill (HIGHWAY Ab!:irn.:FuN'Ds
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1995 $ 6221
FED SHARE $ 4977
GA. SHARE $ 1244
0TH SHARE $
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1995 $ 1000
FED SHARE $ 1000
GA. SHARE $
0TH SHARE $
PE NONE $
0
ROW 1994
$-
0
CONST. 1995
$
523
FED SHARE$ 523
GA. SHARE$
0TH SHARE$
CLAYTON 713090
STATUS:
I-85 NB 62 SIGNS FROM I-285 TO SR 166 LAKEWOOD FWY FULTON
SIGNING/ MAINTENANCE PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE NOT APPLICABLE
PE NONE $
0
ROW NONE $
0
i:CC/tONST'l995 '$ 223
;~;; SOURcfi ff;ATE MAiNT. /
FEO~ ,jt~(i~#AY ADMIN FUNDS \
FEDSHARE $ 223 GA. SHARE$
71309.tt::i:suut ASSOCIATED PROJECT;
0TH SHARE$
CLAYTON 713210
'STATUS:
I-285 EAST TO I-75 SOUTH RAMP ALIGNMENT
RAMP/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER:. D. SMITH
SEND LGPA IN 1995
CONG DIST. "3
FUND SOURCE: I-sTi.'.ff!l::T. FEDERAL HIGHWAY AI/~}NFUNDS
PE 1995 ROW 1997
CONST
$
10
$
50
AFTER 97
.. ,
I!!!!'!!'!!!!
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CLAYTON 721040
STATUS:
SR 54 (& FAYETTE CO) @ MORNING & CAMP cm<s; & FLINT RIVER
REPLACEMENT OF THE EXISTING BRIDGES (S) . tROM 2 TO 4 LANES.
~;i:= 1~Jt~p1 :~:Ei;~;~:~:OUTILITIES; FAYETTE
9-11-89
CLAYTON 721270
;;ci!(:ii~~r:',F=,~~~~L~~~~f~ll~ ;o~;~i,!,V'""
:!Ci> 30
~~i~:M!~E:~~N~L~s
. .:: ::
STATUS: DOT TO PAY UTILITIES 11-1,QfQ?. (
ATLANTA TIP f CL23/FY2 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL10/DK8 CONG DIST. 3 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
~~~B~~T~ ~~~~~B~/ CLAYTON
9
721290 !~c~~s~:u~~I~~ {F:i~l!fJ~ ~~o!-~N
~;i:=:~::~;i:~;it STATUS:
1
!~bis;/dA$ grE/FAX~IwJil~i~f
ATLANTA TIP f CL15/FY4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 72144X
STATUS:
CLAYTON 721480
STATUS:
28:< SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 SEE FAYdff 1
RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSEb':i PROJECT MILEAGE : 5,53 MANAGER: M. REYNOLDS
SR 138 FM WALT STEPHENS RD EAST TO I-75/HENRY'~gc,, RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.55 MANAGER: J. GARLAND (M) REQ CLAYTON & HENRY COUNTIES DO UTILITIES 6-7-90.
\ATLANTA TIP f CL41/FY10 ''(CONG DIST. 3
',:{);UND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
d2f440<rs AN ASSOCIATED PROJECT.
mw\;~;~~.;1, , CL "
FUND s66Rci = suRFAcE Tru&JJi!W'.f:\ FEC>s:@ HIGHWAY ADMIN FUNDS
CLAYTON 721555
STATUS:
SR 85@ SR 331 & I-75 RAMP INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. GODWIN COUNTY SGN ROW & UTILITIES 3-2-93; FOREST PARK N/A
,;f[~~;.;'.,'.;;rfJr"
;gm; SOURcEiiik~: SAFETY
FEDERAL HIGH.iiAY ADMIN
CLAYTON 721860
STATUS:
TARA BLVD@ I-75 (GATEWAY PROJECT) LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 6 MANAGER: J. GRAYBEAL (C) TO BE DONE BY CONTRACT
ATLAN~: ~:[: f CONG DIST. \3
FUND SOURCE: FEDERAL HIGHWAY
22-Feb-1994 Page 3
FISCAL YEAR
COST ESTS
PE 1986
UNDERWAY
ROW 1995
$
552
CONST 1995
$ 3246
FED SHARE $ 2597
GA. SHARE $
649
0TH SHARE $
PE 1992
UNDERWAY
ROW 1992
UNDERWAY
CONST 1995
$ 4235
FED SHARE $ 3388
GA. SHARE $
847
0TH SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY $ 1600 AFTER 97
PE 1996 ROW CONST
$
0
AFTER 97
AFTER 97
PE 1992 ROW 1996 CONST
UNDERWAY $ 4970 AFTER 97
PE 1993
UNDERWAY
ROW LOCL
1995
$
904
FED SHARE $
814
GA. SHARE $
90
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
120
FED SHARE $
96
GA. SHARE $
36
0TH SHARE $
60
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEl'AK,l1ENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CLAYTON 730920
STATUS:
PANOLA RD FM STAGECOACH RD TO FLAKES MILL RD IN HENRY CO RECONSTRUCTION & WIDENING FROM 2 LANES TA LANES.
~~~!: :~:Ef;~~iL~~:~~) UTILITIES; HENI&i!lissED 6-26-92
ATLANTA TIP t CL16/HE4
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 4
FISCAL YEAR
COST ESTS
PE ROW LOCL CONST
$
5
AFTER 97
CLAYTON 731050
STATUS:
SR 85 AT SR 138
INTERSECTION IMPROVEMENT PROJECT MILEAGE : 1.18 ~
/PROPOSED :MES: 4
MANAGER: D. GODWIN (C)
REV REQ COUNTY- DO ROW & u-rfff:fifa 11-4-93
STATUS:
ATLANTA TIP t CL 80
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t CL 81
CONG DIST. 3 & 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 731070
STATUS:
TARA BLVD AT OLD DIXIE HWY INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .95 - EXIST. LANES: MANAGER: D. GODWIN REV REQ COUNTY DO ROW AND UTILITIES 11-4-9~::
CLAYTON 731400
STATUS:
SR3/US19&41/TARA BLVD AT CR 537/FREEMAN RD
INTERSECTION IMPROVEMENT/ SAFETY
.
PROJECT MILEAGE : .31 - EXIST . LANES: 0 /PROPOSED LANES.::
MANAGER: D. GODWIN
CLAYTON SGN FOR UTILITIES 12-1-92
CL 84
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
t~~~~~si~j~t CL 92
;:il!~!~w!~Tf.Bt-1~!1:ui!~::<
CLAYTON 751730
STATUS:
CR 1342/BATTLE ~REEK RD@ JESTERS CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: D. GODWIN .(CM) CLAYTON SIGNED 6/6/89 FOR ROW AND UTILITIES.
CLAYTON BATTLECREEK-MT.ZION FM SOUTHLAKE PKWY TO LAKE HARBIN RD 751770. RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
'PROJECT MILEAGE : 2.63
MANAGER: J. GRAYBEAL. (C)
STATUS: CLAYTO-N. COUNTY. SIGNED 3-5-91 . FOR ROW AND UTILITIES.
FUND souRcit'iiid:DGE PROGRAM
FEDERAL.ill:GHW'AY ADMIN
..-.-
,.,,.,,..,-
i T
FUND SOURCE: FEDERAL HIGHWAY
PE NONE
$
ROW LOCL
CONST 1995
$
FED SHARE $
GA. sHARE $
0TH SHARE $
0
453 408
45
PE 1994
UNDERWAY
ROW LOCL
CONST 1995
$
372
FED SHARE $. 335
GA. SHARE$
37
oTH SHARE $
PE 1994
UNDERWAY
ROW LOCL
CONST 1995
$
434
FED.SHARE$
434
GA. SHARE$
0TH SHARE$
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
154
FED SHARE$
154
GA. SHARE$
0TH SHARE$
PE 1991 UNDERWAY
ROW LOCL
.
1996 $ ' 409
FED SHARE. $ . 327
.GA. SHARE$
82
0TH S_HARE $
PE 1995 ROW LOCL CONST
. $
10
AFTER 97
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CLAYTON 751775
STATUS:
BATTLE CREEK RD FM VALLEY HILL RD TO SOUTHLAKE PKWY RECONSTRUCTION & . WIDENING FROM 2 LANES T:...4 LANES. PROJECT MILEAGE: 1.98
~~;~:= :tii4hs cgtJN;~D=i~NJ;l 6-4-91 FOR ROW &
ATLANTA TIP lt CL 17 CONG DIST. 3
FOND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 5
FISCAL YEAR
COST. ESTS
PE 1995 ROW LOCL CONST
$
10
AFTER 97
CLAYTON 751790
STATUS:
PANOLA RD FM BOULDERCREST RD TO,,sfkai28i~H RD
1
::g~~;R~iii~~E& .wiD~~ING FRO~J#~ES TO 4 LANES. ;
MANAGER: M. REYNOLDS (M) ; :: : :
CLAYTON COUNTY SIGNED 5-21:f:91:toR. ROW, UTIL & 100% fu/COST
CLAYTON 751800
STATUS:
TO BOOLOtll.T ANVILBLOCK RD FM END g;;(:tAhENED SECTION E
RD
RECONSTRUCTION & WIDENlNG{FROM 2 LANES TO 5 LANE.sf'/::::/"'''.
PROJECT MILEAGE : .63
MANAGER: D. GODWIN (C)
CLAYTON COUNTY SIGNED 6-4-91
ATLANTA TIP# CL16/HE4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP# CL 60 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 ROW LOCL CONST
$
10
AFTER 97
PE 1996 ROW LOCL CONST
$
10
AFTER 97
CLAYTON 751810
STATUS:
FLINT RIVER RD FM WEBB DR TO TARA BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO PROJECT MILEAGE : 2.71 MANAGER: D. GODWIN (C) CLAYTON COUNTY SIGNED 5-21-91 FOR ROW
FUND SOURCE: SURFACE TRANSPORT. JfEl)ERAL.HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
10
AFTER 97
CLAYTON SR 314/FAYETTE' LE RD FM SR 279 TO NORMAN DR/CR
FAYETTE...
751850 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
.
iliqH~:~:~~~t~~rJ~ks STATUS:
11-0J~~ 9-30-91; FAYETTE REFUSED
CLAYTON 752060
STATUS:
MORROW RD/CR 1348@ JESTER'S CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: D. GODWIN CLAYTON COUNTY SGN ROW, UTILITIES & DETOURS 6-2-92.
CLAYTON 752180
STATUS:
CONLEY RD (AIRPORT RD EXT) FM OLD DIXIE HWY/SR 3 TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.70 MANAGER: G. ROSS SEND LGPA WHEN PROJECT IS ADDED TO CWP
.. :!~TA :ft:# CL5/FY8
PE 1996
))::Ot-lG DIS.'.1'{{5
ROW
~6WEf; F;:i
1
SURFACE T~;t'8lfi:
CONST
FEDERAL: HIGHWAY ADMIN FUNDS
/.
75185:i('IS AN ASSOCIATED'''PROJECT .
$
250
AFTER 97
AFTER 97
TA TIP lt c'.1J\/ >
DIST.
.FtiND SOURciD::aKioGE PROGRAM
FEDERAL.,HIGH.WAY ADMIN
PE 1993
UNDERWAY
ROW LOCL
1995
$
196
FED SHARE $
157
GA. SHARE $
39
0TH SHARE $
ffp ATLANTA
lt
CONG DIST.\3
PE 1995 ROW LOCL CONST
$
51
AFTER 97
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CLAYTON 752240
STATUS:
FOREST PARKWAY @ GERMAIN INDUSTRIAL BLVD.. WEST OF SR 42
INTERSECTION IMPROVEMENT / SAFETY
\\
PROJECT MILEAGE: .45 - EXIST. LANES: 4 /~ROPOSED LANES: 4
MANAGER: D. GODWIN (C)
CLAYTON COUNTY SIGNED 9-7-93 FOR ROW &
.:::!tff{lll
ATLANTA TIP f CL 86 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 770230
STATUS:
ATLANTA TIP f CL 91 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
2;:--Feb-1994 Page 6
FISCAL YEAR
COST ESTS
PE 1994
UNDERWAY
ROW LOCL
CONST 1995
$
532
FED SHARE $
479
GA. SHARE $
53
0TH SHARE $
PE ROW LOCL CONST
$
8
AFTER 97
CLAYTON 77046,0
STATUS:
JESTERS CK GREENWAY FMfffoih:sBORO TO MORROW
BICYCLE/PED. FACILITY / ENHANCEMENT PROJECT MILEAGE: 4.00 -EXIST. LANES: 0 /PROPQ$lffiifilffiEs: 0
MANAGER: UNKNOWN TO BE DONE BY CONTRACT
ATLANTA TIP t CL 89
CONG DIST. 3
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
CLAYTON 770500
STATUS:
.HISTORIC DEPOT RESTORATION IN JONESBORO MISCELLT'.t1EOUS IMPROVEMENTS / ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: UNKNOWN TO BE DONE BY CONTRACT
CLAYTON 770600
STATUS:
TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN SIGNALS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANESj
MANAGER: BURT RIDDLE CLAYTON SGN DO ROW, UTIL, PE & 20% CONSTRUCTION 8-3-93.
CL 90
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
<:ti;ii:=::. .
;~~t \t ~~~~~sf CL 94
CLAYTON 7V1011
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH
\\?<:)NG
. ;~; SOORclil ;ts~RLY FEDERAL.TR.lillstT
CLAYTON 7Vl012
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY' MANAGER: STEVE.KISH
PE 1995
$
40
ROW 1995
$
300
CONST 1995
$ 1394
FED SHARE $ 1115
GA. SHARE $
68
0TH SHARE $ .. 347
PE LOCL
ROW LOCL
CONST 1996
$
94
FED SHARE $
75
GA. SHARE $
0TH SHARE $
19
PE 1994
$
50
ROW NONE
$
0
CONST 1995
$
450
FED SHARE $
360
GA. SHARE $
0TH SHARE $
90
~M'ITAL 1995
$
27
FUND FED SHARE$
22
GA. SHARE$
2
0TH SHARE $_
3
CAPITAL 1996
$
28
FUND
FED SHARE$
22
GA. SHARE$
3
0TH SHARE$
3
,: ., . ..,.
,.
Qt.,_J,_.
t2L:i..!i-!:2l
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COBB 712750
STATUS:
WINDY HILL RELIEVER BRIDGE OVER I-75 (PaASE I) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : .00
~:G:~~ \~o:~siTigTIES & 100% PE 3-26;~;:::::
ATLANTA TIP i C0171
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 7
FISCAL YEAR
COST ESTS
PE LOCL
ROW NONE
$
CONST 1995 $
FED SHARE $
GA. SHARE $
0TH SHARE $
0 5500 4400 1100
COBB 712752
STATUS:
WINDY HILL RELIEVER FM COBB PKWY/Tb THE I-75
RECONSTRUCTION & WIDENING. NO{LANE :),DDITION
~~i!: M~~E!~!s: (M;o . J)j:! 1:1!;::>
-:-:-.-:.'."-'.
COBB SGN 3-26-93 UTIL/PE/ROW"EXECPT FROM us 41 TO cfi~tE 75
ATLANTA TIP i CO 171
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW 1996
$
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
1200 1600 1280
320
COBB 7127.53
STATUS:
WINDY HILL RELIE~::~!II!~::~ BR TO POWERS FERRY,ijp
CONSTRUCTION OF NEW ROUTE}WITH 4 LANES PROPOSED . PROJECT MILEAGE: .70 MANAGER: G. ROSS (CM) COBB SGN DO ROW, UTILITIES & J:li:-r 100% PE 3.,;26:f93) /
COBB 712800
STATUS:
FbJ KENNEDY INTERCHANGE@ I-75 (CONTRACT l);SEE 71Y800
INTERCHANGE / NEW CONSTRUCTION
.
. : }/ : }
PROJECT MILEAGE : . 00 - EXIST. LANES: 6 /PROPOSED)LANES: 10
MANAGER: G. ROSS (C)
......... .
COBB SGN DO ROW, UTIL, PE & $3,872,000 CST:,G9.$.i;::~q1i~93
ATLANTA TIP i CO 171
'CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
,/ATLANTA TIP i CO-R 78 f:coNG DIST. 6
)~UND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
)fifefo6',:IS AN ASSOCIATED PROJECT.
PE LOCL
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
4200 3360
840
PE LOCL
ROW LOCL
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
17007 13606
471 3872
COBB 712804
STATUS:
KENNEDY INTERCHANGE I-75 IMPRV INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. MANAGER: G. ROSS (CM) COBB SGN FOR ROW, UTILITIES & 100% PE 3-26-93
FUND :~6tffldi: I-ST/\'l'E MAX~>.
FEDl!i.tuu>li'rGHwAY AbMIN tyNl::5s
PE LOCL
ROW LOCL
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
39855 35870
3986
COBB 712890
STATUS:
I-75/SR 401 FM I-285 NORTH TO SR 5 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 8.38 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: E. LAWS
NOT APPLICABLE
:::~t;; SOURcf{::~~s. ENHANCE. : : FEDERAL -.Hl:CHWAY ADM IN FUNDS .. :::: ',
PE NONE
$
ROW NONE
$
~ 9
:'. /CONS;E~ ~!ARE
GA. SHARE $
0TH SHARE$
0
0
3687 2950
737
COBB 71297Y
STATUS:
HOV LUMP SUM SIGNING ON I-75 & I-85 METRO ATL; SEE CLAYTON HOV LANES/ SAFETY PROJECT MILEAGE: .00 EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
ATLANTA i.P i R 73
CONG DIST .<7
FUND SOURCE: I-ST.i{ti\i{Ji'.~NT.
FEDERAL HIGHWAY AbM'tN FUNDS
712970 Is AN Ass6d.ii.TED PROJECT.
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1995
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COBB 71314Z
STATUS:
COMMUNICATION CABLE ON I-75 FM MISCELLANEOUS IMPROVEMENTS/ SAFETY' PROJECT MILEAGE : 7.13 - EXIST. LANES: MANAGER: BURT RIDDLE
I-285; FULTON
ATLANTA TIP f R 169 CONG DIST. 5 & 6
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
COBB 713240
STATUS:
I-285@ WEST PACES FERRY RD BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: G. ROSS SEND LGPA IN 1997.
CONG DIST. 6
FUND SOURCE: I-STATE MAINT . FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Pag.e 8
FISCAL YEAR
COST ESTS
PE NONE $
0
ROW NONE $
0
CONST 1995 $
0
FED SHARE$
GA. SHARE$
oTH SHARE $
PE 1995 ROW NONE.
CONST
$
50
$
0
AFTER 97
COBB
KENNEDY INTERCHANGE
71Y800 INTERCHANGE/ NEW IN~:TRU~TTnN
'.. - ' PROJECT MILEAGE : . 00 -
MANAGER: G. ROSS (C)
STATUS:
ATLANTA TIP f CO-R 78
CONG DIST. 6
FUND SOURCE: I-STATE MAINT . FEDERAL HIGHWAY ADMIN FUNDS 712800 IS AN ASSOCIATED PROJECT.
PE LOCL ROW 1995 $' CONST 1995 $
. FED SHARE $ GA. SHARE $ 0TH SHARE $
3500 4866 4379
487
COBB 71Y804
STATUS:
KENNEDY INTERCHANGE@ I-75 - TO
INTERCHANGE/ NEW CONSTRUCTION
PROJECT MILEAGE : .oo - EXIST. LANES: 6 /PROPOSE:B:@mkS: 10
MANAGER: G. ROSS (CM) COBB SGN FOR ROW, UTILITIES & 100% PE
COBB
N'SIDE PKWY@ CHATTAHOOCHEE RVR INCL APPR/& ;:~,ON CO
720125 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 6
PROJECT MILEAGE : 1.01
MANAGER: BEN BUCHAN
STATUS: COBB SGN 10-9-79 UTIL; REQ ATLANTA DO UTIL 2-27-90
COBB 720468
STATUS:
SR 6/US 278@ CSX RR 2.8 MI W/POWDER SPRINGS; & 72Y468 BRIDGE REMOVAL/ NEW CONSTRUCTION PROJECT MILEAGE.: .30 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN REQ COBB COUNTY DO UTILITIES 5-8-91
)ATLANTA TIP f CO-R 78
'ONG DIST. 6
\(==;UNO SOURCE: NAT' L HIGHWAY fEQ:E:R,A:C, HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
4000 3200
800
rh, ..... ATLANTA
t AT12/co24
=?\<::ONG DIST(::5 & 6
F~;:~2m.mr BRIDGE ~ROG~>>'
FEDERA'.LJtrGHWAY ADMIN FtiNbs 72Y12S}is AN AssocfA.TED PROJECT.})
PE 1981 UNDERWAY
ROW 1985 UNDERWAY
CONST 1996
$ 2500
FED SHARE $ 2000
GA. SHARE $ 500
0TH SHARE $
:;:i~~~~si~p7!:r@i~*! /
R~: t::! g:g:::~~
............ ,.
.:..,......,.::-:.:::::.:.::-:,coNST 1995 . $ . 855
idiio souRcii=1Jfu.AcE TRANSPORT;)
FED SHARE $ 684
FEDERAL HIGHWAY ADM IN FUNDS , : : : \
72Y468 fs hlr ASSOCIATED PR,Q#c:t?
GA. SHARE $ 171 0TH SHARE $
COBB 721150
STATUS:
SR 3/US 41/COBB PKWY FM AKERS MILL RD TO SPRING ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE : .54 MANAGER: G. ROSS (C) COBB SGN 12~3-92 .FOR UTILITIES, PE & $100,000 CONSTRUCTION.
ATLANTA,fiP f CO 80
CONG DIST. S
FUND SOURCE: NAT'.:dkdk:~y FEDERAL HIGHWAY ADMIN-FUNDS
PE 1992
UNDERWAY
ROW 1995 $ 2070
CONST 1997
$ 2130
FED SHARE $ 1704
GA. SHARE $ 326
0TH SHARE $ 100
~
~
i""""'"""
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COBB 721250
STATUS:
SR 3/US 41/COBB PKWY FM SPRING RD N TO TERRELL MILL PHl,3
RECONSTRUCTION & WIDENING FROM 4 LANES TC>:: 8 LANES.
PROJECT MILEAGE : 1.69 MANAGER: G. ROSS (M) COBB COUNTY SIGNED 7/14/88 FOR
ATLANTA TIP t CO 81
CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS
22-Feb-1994 Page 9
FISCAL YEAR
COST ESTS
PE 1992 ROW 1996 CONST
UNDERWAY
$ 1311 AFTER 97
COBB 721310
STATUS:
SR 120/ROSWELL RD FM SR 120 LP T$}~tJB~6~T RD/~i~'.l'TA
RECONSTRUCTION & WIDENING FROM:4 ~ES TO 6 LANES.
PROJECT MILEAGE : 1.50
MANAGER: D. SMITH (M) REQ MARIETTA UTIL 11/90;
~Vin . REFUSED BY LETTER
ATLANTA TIP f CO 177 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW 1997 CONST
$
80
$ 1050
AFTER 97
COBB 721670
STATUS:
S.MARS HILL EXT FM OLfr'=pi 278/SR6 BUS TO SR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4
:~!~!h PROJECT MILEAGE : 5.44
MANAGER: D. SMITH (CM) CONTRACT SENT 8-12-93 REQ
HWY
ATLANTA TIP f CO 123
CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL ROW 1996 CONST
$ 8000 AFTER 97
COBB 721680
STATUS:
SR 176/MARS HILL RD FRM SR 120/DALLAS HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO PROJECT MILEAGE : 4.35 MANAGER: D. SMITH (CM)
CONTRACT TO co 8-12-93 REQ DO PE/UTL; (CO 1?11.Ev{slhil@/93 UTIL)
COBB 721685
STATUS:
MARS HILL RD FM STILESBORO RD TO SR 3/COBB P~AY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.13 MANAGER: D. SMITH (CM) CONTRACT SENT 8-12-93 REQ CO DO PE & UTILITIES
FUND SOURCE: NAT'L HIGHWAY
t~~~;:;11, FEDERAL HIGHWAY ADMIN FUNDS co 124
~:~il~!~w!~TiM~!;JZt!: )'
PE 1992 ROW 1996 CONST
UNDERWAY $ 6685 AFTER 97
PE 1992 ROW 1996 CONST
UNDERWAY $ 4880 AFTER 97
COBB 72Yl25
STATUS:
NORTHSIDE PKWY@ CHATTAHOOCHEE RVR- FOR 33C $; SEE 720125 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 1.00 MANAGER: BEN BUCHAN LGPA NOT APPLICABLE FOR THIS PROJECT
COBB 72Y468
STATUS:
SR 6/US 278@ CSX RR - FOR "BR" FUNDS; SEE 720468 BRIDGE REMOVAL/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN
J ){iLANTA TIP t :A4ti~~Ilil'.
' (ciQNG DIST. 6(&{5 :
~m:;; souRcil '/.H&AcE TRANSP~lf'.
< ~~~!~t~JIW!;s:~r~E~u~~~Jieil
PE 1993 UNDERWAY
ROW 1985 UNDERWAY
CONST 1996
$ 1000
FED SHARE $ 800
GA. SHARE $
200
0TH SHARE $
ATLANTA:fip f CO 225 .
P.E NONE $
0
CONG DIST. ::._7
ROW NONE $
0
CONST 1995
$
500
FFUEDNDERASOLUHRICGEH:WABYRIDACDi~f~INfi:OFGURNADMS
FED SHARE$
400
GA. SHARE$
100
720468 IS AN ASSOCIATED PROJECT.
0TH SHARE$
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENT!:
COBB 731020
STATUS:
SR 120 LOOP /N. MARIETTA PARKWAY AT cn,.,E :,,STREET
;~~JE~~~~L,A~~~T~17 - EXIST. LANES.: 4 )#R9POSED LANES: 4
MANAGER: D.. GODWIN
MARIETTA SGN 3-11-93 FOR ROW,
OTO
ATLANTA TIP i CO 234
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL H.IGHWAY ADMIN FUNDS
COBB 751890
STATUS:
sR.176@ sR 6 Bus, MACEDONIA RPi~d6t;;GRADE s;8ij4s
INTERSECTION IMPPOVEMENT / REC~tF 1F'REHAB.
,
PROJECT MILEAGE : . 00 - EXIST) t~'Es: 2 /PROPOSED \Nii:s: 3
t~~~ ~~::R~P~iN~~D:~: 9-21-~p}
~GN 3-22-91 FOR UTi4IES.
ATLANTA TIP i CO 227
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
COBB 752220
STATUS:
SR 6 BUS/ELLIOTT RD it.!lI~8~ER SPRINGS CRK w OF po~liii{sPRGS REPLACEMENT OF THE EXISi{Nc; BRIDGES (S). NO ADDED.,::,Wi;:s: PROJECT MILEAGE : .00 MANAGER: D. GODWIN (M) SEND LGPA IN 1996
ATLANTA TIP i CO 247
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COBB 752260
STATU.S:
SR 6 BUS REALIGNMENT WITH BROWNSVILLE
INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .00'- EXIST. LANES:
MANAGER: D. GODWIN POWDER SPRINGS SGN ROW & UTILITIES
co 248
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
=:=:::\.:,..
.
COBB 752310
STATUS:
OLD CANTON RD OVER SHEFFER CK TRIBUTARY/SOPE REPLACEMENT OF THE .EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE .: 0 0 MANAGER: D. GODWIN REQ COBB DO.ROW, UTILITIES & DETOURS 9-30-93
COBB 752450
STATUS:
SR 280/SOUTH COBB DR. SIGNAL SYSTEM FM I-285 TO PAT MELL RD
SIGNALS/ SAFETY PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE CONTACT TRAFFIC OPERATIONS
,., ATLANTA T~~}i CO 2 4 6 =:;:cONG DIST//6
FUN~ 9i'l't: BRIDc;r,: PP,Q$~/
FEDERAL diIGHWAY ADM IN ,FUNDS
~~~t.;: ,!ll:itJ'F
=;m;; souRcff ili4ifuoWN.
FED~~,JiI:i:;g'efJi.y ADMIN
COBB 770350
STATUS:
OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF. THE EXISTING BRIDGES (S) . NO ADDED LANES,
PROJECT MILEAGE : ;oo
MANAGER: D. GODWIN
SEND LGPA IN 1995
ATLANTA \fP i CONG DIST. "6
FUND SOURCE: FEDERAL HIGHWAY
22-Feb-1994 Page 10
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW LOCL
CONST 1995
$
94
FED SHARE $
85
GA. SHARE $
9
0TH SHARE $
PE NONE
$
0
ROW 1993 UNDERWAY
CONST 1995
$
403
FED SHARE $
363
GA. SHARE $
40
.OTH SHARE $
PE 1995 ROW 1997 CONST
$
16
$
1
AFTER 97
PE 1994
UNDERWAY
ROW LOCL
CONST 1995
$
210
FED SHARE $
189
GA. SHARE $
21
0TH SHARE $
PE LOCL
ROW LOCL
CONST 1996
$
802
FED SHARE $
642
GA. SHARE $
160
0TH SHARE $
PE 1995
$
10
.ROW NONE
$
0
1995
$
866
SHARE $
866
GA. SHARE $
0TH SHARE $'
PE LOCL
ROW LOCL
CONST 1997
$
166
FED SHARE $
133
GA. SHARE $
33
0TH SHARE $
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COBB 770360
STATUS:
HIRAM RD/CR 2081 OVER POWDER SPRINGS
REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : 00
.
MANAGER: D. GODWIN
SEND LGPA IN 1995
ATLANTA TIP i CO 245
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 11
FISCAL YEAR
COST ESTS
PE LOCL
ROW LOCL
CONST 1997
$
299
FED SHARE $ 239
GA. SHARE $
60
0TH SHARE $
COBB 770370
STATUS:
FRIENDSHIP CHURCH RD/CR 942 REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: D. GODWIN SEND LGPA IN 1995
ATLANTA TIP t CO 240
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1997
$
127
FED SHARE $ 102
GA. SHARE $
25
0TH SHARE $
COBB 770470
STATUS:
HISTORIC DEPOT MISCELLANEOUS PROJECT MILEAGE : .00 MANAGER: STEVE YOST
TO BE DONE BY CONTRACT
ATLANTA TIP t CO 237
CONG DIST. 6
0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996
$
i56
FED SHARE $ 125
GA. SHARE $
0TH SHARE $
31
COBB 770601
STATUS:
TRAFFIC SIGNAL SYSTEM
SIGNALS/ SAFETY PROJECT MILEAGE :
. 00
-
EXIST.
LANES:
0
/PROPOSEQ :~ES.:
0
~!G!~~ ~~R!o!~Dg;~L, PE & 20%coNsTRUCTt9.~ <i~gd8C;3
COBB 770635
STATUS:
6 COBB COMMUNITY TRANSIT BUSES EQUIP. PURCHASE/ CAPITAL PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES{ MANAGER: NOT APPLICABLE
:}ATLANTA TIP t CO 249
\{hoNG DIST. 6 & 7
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
flt:~~Jli'ci- 163 FUND i1BW2f: CONG MIT .1Aik'.:dJKt FEDERAL HIGHWAY AtiMIN FtlNDS
PE 1994 $
50
ROW NONE $
0
CONST 1995 $ 950
FED SHARE $ 760
GA. SHARE $
0TH SHARE $ 190
PE NONE $
ROW NONE $ CONST 1995 $
FED SHARE $
GA. SHARE $ 0TH SHARE $
0 0 1320 1056
264
COBB 770730
STATUS:
CONCORD COVERED BR/CONCORD RD OVER NICKAJACK. CREEK BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER: UNKNOWN DOT WILL PROVIDE THE 20% MATCH
PE NONE $
0
ROW NONE $
0
1995 $
37
FED SHARE $
30
GA. SHARE $
7
0TH SHARE $
COBB 7D7029
STATUS:
TRANSIT COACHES, PARATRANSIT BUSES, AND PLANNING PROJECTS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH .
INCLUDES PLANNING FUNDS
CONG DIST. 6 & 7
FUND SOURCE: FEDERAL TRANSIT
CAPITAL 1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
2736 2189
328 219
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COBB 7D7030
STATUS:
TRANSIT COACHES, PARATRANSIT BUSES, TRANSIT l'ROJECT?, / CAPITAL FUNDS RECIPIENT: COBB COMMUNITY MANAGER: STEVE KISH INCLUDES PLANNING FUNDS
CONG. DIST, 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
COBB 7D7044
STATUS:
PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ FUNDS RECIPIENT: COBB MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST, 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
COBB 7D7045
STATUS:
PUBLIC TRANSIT TRANSIT PROJECTS FUNDS RECIPIENT: COBB COMMITT'IJT MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS
COBB 7Vl014
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH
DIST. 7 & 6
COBB 7Vl015
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH
22-Feb-1994 Page 12
FISCAL YEAR
COST ESTS
CAPITAL 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
2736 2189
328 219
OPERATING 1995
$
896
FED SHARE $ 448
GA. SHARE $
0TH SHARE $ 448
OPERATING 1996 $ 896
FED SHARE $ 448 GA. SHARE $ 0TH SHARE $ 448
CAPITAL 1995
$
67
FUND FED SHARE $
54
GA. SHARE $
6
0TH SHARE $
7
1996
$
70
FED SHARE$
56
GA. SHARE$
7
0TH SHARE$
7
,.
~
i .
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS -PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DEKALB 710323
STATUS:
BIKE/PEDESTRIAN WAY - MORELAND AVE TO S~QNE MTN PARK
BICYCLE/PED. FACILITY / ENHANCEMENT
ii'''':-.
PROJECT MILEAGE : .00 - EXIST, LANES: 0 /P.Il.QPOSED LANES: 0
MANAGER: STEVE YOST
}@ \:,
TO BE DONE BY CONTRACT, , , .. , ...,-;:,:;,,,:::::,::;:c:i;\'"\ , , , ,
ATLANTA TIP t DK 121
CONG DIST, 5 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 13
FISCAL YEAR
COST ESTS
PE LOCL
ROW NONE $
CONST 1996
$
FED SHARE$
GA. SHARE $
0TH SHARE$
0 1600 1280
320
DEKALB 712870
STATUS:
DEKALB 713040
STATUS:
1-20 BARRIER WALLS @i\trll~~~AGE RPS/ , RocKD,J!s[t"moN
o o ;~~c~ ~f~!~~~c~0. 10 JkxisT. LANES: /PRopdtJB itEs:
MANAGER: BILL MOSKAL SEND LGPA WHEN PROJECT IS
ATLANTA TIP t R 59
CONG DIST. 11
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 71Y870 IS AN ASSOCIATED PROJECT.
PE 1993
UNDERWAY
ROW 1995
$ 5840
CONST 1996
$ 8000
FED SHARE $ 6400
GA. SHARE $ 1600
0TH SHARE $
ATLANTA TIP t R 130
CONG DIST~ 4 & 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
30 0
10700 9630 1070
DEKALB 71307X
STATUS:
I-285 EB 49 SIGNS FM JONESBORO RD TO GLENWOOD SIGNING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: L. SEABROOK
PE NONE $
0
ROW NONE $
0
CONST 1995 $
0
FUND SOURCE: I-STATE MAINT,
FED SHARE $
rs FEDERAL HIGHWAY ADMIN FUNDS
Af~9:f5 : AN ASSOCIATED PROJECT.
GA. SHARE $ 0TH SHARE $
DEKALB 713100
STATUS:
COTILLIAN DR/SAVOY DR ONE-WAY PAIR ON EACH SIDE CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED.
PROJECT MILEAGE : 2.02 MANAGER: UNKNOWN CONTACT TRAFFIC OPERATIONS
\:~~;~~1si~~~t DK 117
.i;6,6i.: FUND
I-STATE MAii'f{(
Fwos FEDEilii.i:i:GHWAY ADMrn
PE NONE
$.
0
ROW NONE $
0
CONST 1995
$
116
FED SHARE $ 104
GA. SHARE $
12
0TH SHARE $
DEKALB 71314X
STATUS:
COMMUNICATION CABLE ON I-85 FM I-75 N TO SR 400; SEE FULTON MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : 7.95 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE
t : ::i:1~~1s~:P 4~J,~~;~~j
~~~ ~g~~ ~
*!Ei~fil~f&;H~~t~[~ii:f' tONS*:'iiill !
0 0 0
DEKALB COMMUNICATION CABLE ON I-20 FM CAPITOL AVE TO I-285; FULTON
PE NONE $
0
71315X MISCELLANEOUS IMPROVEMENTS/ SAFETY
CONG DIST:\:5 & 11
ROW NONE $
0
PROJECT MILEAGE : 9.70 - EXIST. LANES: 0 /PROPOSED LANES: 0
CONST 1995
$
0
MANAGER: BURT RIDDLE
FUND SOURCE: CONG/Ut;i)~IR QUAL
FED SHARE$
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY fil:lMIN FUNDS
GA. SHARE$
713155 IS AN Ass6c:i1\tED PROJECT.
0TH SHARE$
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMP.ROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DEKALB 713220
STATUS:
I-20@ WESTLEY CHAPEL RD RELOC FRONTAGE\~ (SNAPFINGER WOOD) INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 ;~~()POSED LANES: 2 MANAGER: BEN BUCHAN SEND LGPA IN 1996
CONG DIST. 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 713250
STATUS:
;g iiifW I-285 SOOTH AUXILLARY LN FM SR 8 0
ob ~~~I :m~~; !:~~g~":i~EiG:E~S~ ~
MTN FWY & t:~Y BRIDGE 4 /PROPOSED JWks: 5
MANAGER: BILL MOSKAL
SEND LGPA IN 1996
CONG DIST. 4 & 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FONDS
22-F~b-1994 Page 14
FISCAL YEAR.
COST ESTS
PE 1995 ROW 1997 CONST
$
160
$ 1000
AFTER 97
PE 1995 ROW 1997 CONST
$
140
$ 1000
AFTER 97
DEKALB 713320
STATUS:
I-285 @ SR 8/US 29/~;Jillifi~ILLE HWY
INTERCHANGE / RECST. OR>REHAB.
PROJECT MILEAGE: .oo - ii:xtsT. LANES: o /PROPO$tbillillts: o
MANAGER: BILL MOSKAL
SEND LGPA IN 1995
CONG DIST. 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 721050
STATUS:
.Attii ::~~ ~Fsi~:EE~~:i:~NB~~GE (S) . FROM 2 LANES TO
1 ~.{
PROJECT MILEAGE : .50
MANAGER: D. GODWIN
SGN GWINNETT co 2-19-87 & DEKALB 9-10-86 toR.,QfitiiiIEs
r::i~~~~si~p 4 i DK 99
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS
DEKALB 721055
STATUS:
SR 124@ YELLOW RIVER/ ALSO GWINNETT CO REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 PROJECT MILEAGE: .00 MANAGER: RAY METTS (CM) COUNTY SIGNED 9/10/86 FOR UTILITIES (SEE #721050)
: .~~~~~$~~fl DK 100
FUND:spfuifE: BRIC>~E PR()<;~// FEDEF\AL':C:HIGHWAY ADMINiFONDS
PE 1995 ROW 1997 CONST
$
55
$
100
AFTER 97
PE 1992 .UNDERWAY
ROW NONE
$
0
CONST 1997
$
455
FED SHARE $ . 364
GA. SHARE $
91
0TH SHARE $
PE 1992 ROW 1996 CONST
UNDERWAY
$
1
AFTER 97
DEKALB 72127X
STATUS:
SR 42/MACON HWY FM S/ANVILBLOCK RD TO OLD TONY RD/CLAYTON RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .00 MANAGER: M . REYNOLDS
DEKALB COUNTYSIGNED 7/14/89 FOR UTILITIES (SEE #712270)
DEKALB 721330
STATUS:
SR 124/ROCK CHAPEL RD FM UNION GR RD N TO PLEASANT HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .90 MANAGER: D. GODWIN (M) DEKALB SGN 9-2-88 FOR UTILITIES.
PE 1992 UNDERWAY
ROW 1992
UNDERWAY
i~i~.:i~;~;i:~~!~:~ii;i~f // i;: i::~ ..:,:::'tONST 1995
$
0
$
$
$
ATLANTA itI> i DK 84
CONG DIST. 4
FFUEDNDERASOL UHRICGEH:WANYA TA'Dt iMl l GINH WFOANYDS
PE 1993 ROW 1996 CONST
UNDERWAY $ 1481 AFTER 97
~
lh.J.i .. w3
~
,...:.------'!
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DEKALB 721350
STATUS:
SR 12/COVINGTON HWY FM_ SR 124 E TO RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : 1.20 MANAGER: D. CHURCH (M) COUNTY SIGNED 9-2-88 FOR UTILITIES
ATLANTA TIP t DK 30
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 15
FISCAL YEAR
COST ESTS
PE 1992 ROW 1997 CONST
UNDERWAY $ 3675 AFTER 97
DEKALB 721530
STATUS:
SR 124 FM ROCKBRIDGE RD TO RECONSTRUCTION & WIDENING--~~
PROJECT MILEAGE : 4.10 MANAGER: RAY METTS REQ DEKALB DO UTIL
DEKALB 721535
STATUS:
SR 124 FM PLEASANT RECONSTRUCTION & PROJECT MILEAGE : 2.92 MANAGER: D. GODWIN REQ DEKALB CO DO UTILITIES
ATLANTA TIP t GW 76
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL.HIGHWAY ADMIN FUNDS 72153X IS AN ASSOCIATED PROJECT.
ATLANTA TIP t DK 85
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1997 CONST
PE 1993 ROW 1996 CONST
UNDERWAY $ 6737 AFTER 97
UNDERWAY $ 2327 AFTER 97
DEKALB 721880
STATUS:
US 78/STONE MOUNTAIN FWY N GATE INTERCHANGE @ STONE_.,i4fi::
:!~: ;:;;~~~~~~E{G:E~S~400~
LANES: 4 /PROPOSEP ll.AAt: 4
MANAGER: NEIL DAVIS
DEKALB SGN 5-25-93 FOR PUBLIC UTILITIES
r: l!;~;~s~:p4t DK-R 117
\\/::;UNO SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
)i21aa:2 IS AN ASSOCIATED PROJECT.
DEKALB 730970
STATUS:
SR 212/BROWNS MILL RD@ POLE BRIDGE CRK
-:
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00
MANAGER: D. GODWIN
REQ DEKALB COUNTY DO UTILITIES 5-10-91
:;:;~;~si~fi* DK 98 ::::;:::::::;..
FUND :~&&flfi:: BRIDGE PROG~? ;
FED:efilu:;iiiGHWAY Ab~IN\ftii4os
DEKALB 751340
STATUS:
CR 23/FAYETTEVILLE RD@ SUGAR CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .50 MANAGER: D. GODWIN SIGNED BY DEKALB COUNTY 12-5-86 FOR R/W & UTILITIES
., k~TA TIP t oid1iF
/toNG DIST. 11:)}{ --
=;Jtb SOURcii nm~GE PROGRAM
FEDB;gAJ:.,itJtj~WAY ADMIN
DEKALB 751370
STATUS:
CHAMBLEE-TUCKER RO FM NEW P'TREE RD TO BUFORD HWY/SR 13 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.40
MANAGER: D. GODWIN REQ CO DO ROW & UTIL 2-21-90; CHAMBLEE NOT APPLICABLE
ATLANTAfjP t
CONG DIST .-.;.-4
FUND SOURCE: FEDERAL HIGHWAY
PE 1993 UNDERWAY
ROW 1994 $
10
CONST 1995 $ 2513
FED SHARE$ 2010
GA. SHARE$ 503
0TH SHARE.$
PE 1993 UNDERWAY
ROW 1995
$
10
_CONST 1996
$
498
FED SHARE $ 398
GA. SHARE $
100
0TH SHARE $
PE 1993 UNDERWAY
ROW LOCL
1995 $ 421
FED SHARE$ 337
GA. SHARE$
84
0TH SHARE$
PE 1993 UNDERWAY ROW 1995 $ 3356 CONST 1996 $ 2500
FED SHARE $ 2000 GA. SHARE $ 500 0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DEKALB 751380
STATUS:
CHAMBLEE-TUCKER RD FM I-85 TO I-285 "' RECONSTRUCTION & WIDENING FROM 2 LANES 't(>:cc. 4 LANES.
PROJECT MILEAGE : 1.30
- ~~::~/s~f~~!~
#M~. UTILITIES , $600, 992
ROW cosT
ATLANTA TIP i DK 17
CONG DIST. 4
FUND SOURCE: I-STATE CONST. FEDERAL HIGHWAY ADMIN FUNDS
.,.
DEKALB 751440
STATUS:
WINTERS CHAPEL RD FM OAKCLIFF RD 4~:;~)ca~COPEE ru:i(i ~IGNAL)
CONSTRUCTION OF NEW ROUTE WITli:=4{t$NES PROPOSED. .. :
PROJECT MILEAGE : 90
... ... .
ufffl ~~:R~G~ 6~~~=89 ROW &
&( 2';'
.>ST (T&~ ~~OJECT
ATLANTA TIP i DK 44
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 75Y440 IS AN.ASSOCIATED PROJECT.
22-Feb-1994 Page 16
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW 1993 UNDERWAY
CONST 1995 $ 5009
FED-SHARE $ 4258
GA. SHARE $' 751
0TH. SHARE $
PE 1992 UNDERWAY ROW LOCL
CONST 1995 $ 6610 FED SHARE$ 5288 GA. SHARE$ 1322 0TH SHARE$
DEKALB 751445
STATUS:
DEKALB 751490
STATUS:
WINTERS CHAPEL-OAK:~:;~~:Jl%f CONN @ SOUTHERN RR
BRIDGES / RECST. OR REHfil{( PROJECT MILEAGE : .00
~~~~:~DG~/~g~:9 ROW & UT~if~fi!:s. SEE
ATLANTA TIP i DK 94
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 751440 IS AN. ASSOCIATED PROJECT.
SR 859/COOLEDGE-BROCKETT RD FM E PONCE DE
f~; ATLANTA TIP i DK 79
RECONSTRUCTION & WIDENING FROM 4 LANES TO
:( i@ONG DIST. 11
PROJECT MILEAGE,: .30
MANAGER: D. GODWIN
FUND SOURCE: SURFACE-TRANSPORT.
DEKALB SGN 3-5-90 .FOR UTIL AND WILL MAINTJ\::j:~. vfliiti'i26MPLETED .
FEDERAL HIGHWAY ADMIN FUNDS
:::::.
PE 1992
UNDERWAY
ROW NONE
$
0
CONST 1995 $ 1996
FED SHARE $ 1796
GA. SHARE $ 200
0TH SHARE $
PE 1993 UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$ 1307
FED SHARE $ 1046
GA. SHARE $ 261
0TH SHARE $
DEKALB 751495
STA1US:
DEKALB 751940
STATUS:
SR 859/COOLEDE-BROCKETT RD FM STONE MTN FWY-SR iftw
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 1.00 MANAGER: D. GODWIN
SEE STP-9223 (3), _PI #751490
. ATLANTA Tffi\t DK 7 9 )/coNG DisTL4 & 11
FFEUDNEoim::aJ:brG~HtfW: ASYURFAABCEM. rTnRtttmJronsMfFF>
PE 1996 ROW CONST
$
42
AFTER 97
AFTER 97
CR 5109/STEPHENSON RD@ CROOKED CRK
l ~~~si~P .. : '. :/!1
! ol
REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
1
PROJECT MILEAGE: .00 MANAGER: D. GODWIN
FUND SOURcii::: ma~GE
DEKALB_SGN DO ROW, UTILITIES & NECESSARY DETOURS 6-16-92
FEDE . W.AY ADMI
::j,J/\
PE 1991 UNDERWAY
ROW LOCL
/C:OtlST 1995 $ 272
FED SHARE$ 218
GA. SHARE$
54
0TH SHARE$
DEKALB EAST PONCE DE LEON AT RAYS ROAD 752100 INTERSECTION IMPROVEMENT/ RECST. OR REHAB.
: PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: D, GODWiN
STATUS: DEKALB SIGNED ROW AND UTILITIES 11-12-92
ATLANTA TIP i DK102 CO,, N-G DIST. 4
FUND SOURCE: HWY FEDERAL HIGH~AY
PE 1993 UNDERWAY ROW LOCL CONST 1995 $ 158
FED SHARE$ 142 GA. SHARE $ _16 0TH SH/:\P.8 $
_I
=
m:rrmn
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DEKALB 752470
STATUS:
SR 236/LAVISTA RD AT RANCHWOOD TURN LANES/ SAFETY PROJECT MILEAGE : .16 - EXIST. LANES: MANAGER: D. GODWIN CONTACT TRAFFIC OPERATIONS
ATLANTA TIP f DK 119 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 752480 STATUS:
SR 155/CANDLER RD FM co:Lu1~BJCA/Sfu%ff~f}1~1\:;~,00 SIGNALS/ SAFETY PROJECT MILEAGE : 3.60 MANAGER: BURT RIDDLE
CONTACT TRAFFIC
ATLANTA TIP f DK 120
CONG DIST. 11
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
DEKALB 752500
STATUS:
SR 260/GLENWOOD RD SIDEWALKS / sAFETY PROJECT MILEAGE : .33 MANAGER: D. GODWIN NOT APPLICABLE
CONG DIST. 11
0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
. DEKALB 752510
STATUS:
SR 236/LAVISTA ROAD AT RANCHWOOD DRIVE &
INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .16 - EXIST. LANES: 0 MANAGER: D. GODWIN CONTACT TRAFFIC OPERATIONS
DIST. 4
FUND SOURCE: HWY. SAFETY F~D~RAL. HIGHWAY ADMIN FUNDS
DEKALB 770440
STATUS:
PEDESTRIAN/LANDSCAPING ALONG US 278 IN AVONDALE BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED MANAGER: UNKNOWN TO BE DONE BY CONTRACT
DEKALB 770480
STATUS:
SOUTH DECATUR TROLLY LINE CONVERSION BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STEVE YOST TO BE DONE BY CONTRACT
DEKALB 770530
STATUS:
D'TOWN ST'SCAPES IN DECATUR;SIDEWALKS,X-WALKS,BENCHES,TREES MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN TO BE DONE BY CONTRACT
!!ii~~~~si~p4~&, :fr6
tffub souRc&J ~s. ENHANCE.
FED~~ i-If~ij\'lAY ADMIN
ATL~::111::f
CONG DIST. 4
FUND SOURCE: FEDERAL HIGHWAY
,..
22-Feb-1994 Page 17
FISCAL YEAR
COST ESTS
PE 1994 UNDERWAY
ROW 1995
$
10
CONST 1996
$
40
FED SHARE $
36
GA. SHARE $
. 4
0TH SHARE $
PE 1995 $
15
ROW NONE
$
0
CONST 1995
$
469
FED SHARE $
469
GA. SHARE $
0TH SHARE $
PE NONE
$
0
ROW LOCL
CONST 1997
$
30
FED SHARE $
27
GA. SHARE $
3
0TH SHARE $
PE NONE
$
0
ROW LOCL
CONST 1997
$
48
FED SHARE $
43
GA. SHARE $
5
0TH SHARE $
PE LOCL
ROW LOCL
CONST 1995
$
90
FED SHARE $
72
GA. SHARE $
0TH SHARE $
18
PE LOCL
ROW LOCL
1996
$
625
FED SHARE $
500
GA. SHARE $
0TH SHARE $
125
PE LOCL
ROW LOCL
CONST 1995
$
750
FED SHARE $
600
GA. SHARE $
0TH SHARE $
150
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATT.ON DRAE"r STATE TRANSPORTATION IMPROVEMENTS ,rOGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
DEKALB 770603
STATUS:
TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN SIGNALS/ SAFETY PROJECT MILEAGE : .00 MANAGER: BURT RIDDLE
REQ DEKALB DO ROW,. UTIL, PE
LANES: 0
ATLANTA TIP i DK 118
CONG DIST. 4 & 11
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
t:t.~i"c,.t}-J.!/114
Page 18
FISCAL YEAR
COST ESTS
PE 1994
$
ROW NONE $
CONST 1995 $
FED SHARE $
GA. SHARE $
0TH SHARE $
50 0
1108 886
1 221
DEKALB' 77063Z
STATUS:
REGIONAL RIDESHARE PROGRAM; RIDE SHARING/ OTHER PROJECT MILEAGE : .00 MANAGER: UNKNOWN NOT APPLICABLE
PE NONE $
0
CONG DIST. 5 & 4
ROW NONE $
0
0
CONST 1996 $
0
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE$
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
. 0TH SHARE $
DEKALB 7D701X
STATUS:
TRANSIT TRAVELER TRANSIT PROJECTS FUNDS RECIPIENT: CITY MANAGER: STEVE KISH
CONG DIST. 5
.CAPITAL 1996
$
0
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE$
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
0TH SHARE$
DEKALB 7Vl017
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN MANAGER: STEVE KISH
DIST. 4 & 11
CAPITAL 1995
$ 104
SOURCE: ELDERLY & DISABLED FUND FED SHARE$
83
~~.~~A.L. TRANSIT ADMIN FUNDS
GA. SHARE$
11
0TH SHARE$
10
DEKALB 7Vl018
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH
1996
$ 107
FED SHARE$
86
GA: SHARE $
10
0TH SHARE$
11
~,--... ~
...
, .... ... -~ \ 0 .r.-
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 19
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
------------------------------------------------------------------------------------------ ----------------------------------------
DOUGLAS SR 92 EXT/DOUGLASVILLE FM SR
ATLANTA TIP f DO 2
PE 1996
$
150
720970 BRIDGES/ RECST. OR REHAB.
CONG DIST. 7
ROW
AFTER 97
PROJECT MILEAGE : 1.20
CONST
AFTER 97
MANAGER: BILL MOSKAL (M)
FUND SOURCE: SURFACE TRANSPORT.
STATUS: CITY OF DOUGLASVILLE SIGNED
FEDERAL HIGHWAY ADMIN FUNDS
DOUGLAS 721320
STATUS:
BANKHEAD HWY FM SWEETWATER RECONSTRUCTION & WIDENING PROJECT MILEAGE : 1.30 MANAGER: D. SMITH SEND LGP~ WHEN PROJECT
ATLANTA TIP f DO 16 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 ROW 1997 CONST
UNDERWAY
$ 1450 AFTER 97
DOUGLAS 721435
STATUS:
SR 5/BILL ARP RD@ REPLACEMENT OF THE PROJECT MILEAGE : .50 MANAGER: D. GODWIN DOUGLAS COUNTY REFUSED
DOUGLAS 721470
STATUS:
SR 5 N&SB FM S/SWEETWATER RD ADDITION OF A PASSING LANE. PROJECT MILEAGE: 1.75 MANAGER: D. GODWIN DOUGLAS COUNTY SIGNED 12/19/89
DOUGLAS 742800
STATUS:
LOWER RIVER RD FM SR 92 TO CAMP CREEK RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 6.30 MANAGER: K FULBRIGHT (M) SEND LGPA WHEN PROJECT IS ADDED TO CWP
ATLANTA TIP f 0042
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW 1994
$
1
CONST 1995
$ 1759
FED SHARE $ 1407
GA. SHARE $
352
0TH SHARE $
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
S~~~if i: ) ;~~;~
&D~ 21
Blst F~:i;
SURFACE TRAiiitsJi::>
fo~os FEoEiw 'HIGHWAY ADMIN
PE 1992
UNDERWAY
ROW 1993 UNDERWAY
CONST 1995
$
790
FED SHARE $
632
GA. SHARE $
158
0TH SHARE $
PE 1996
ROW LOCL CONST
$
250
AFTER 97
DOUGLAS 'DOUGLAS BLVD EXT FM CR 814 TO CR 115 751820 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : 1.80 MANAGER: J. GARLAND (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP
$
103
AFTER 97
DOUGLAS 751825
STATUS:
DOUGLAS BLVD EXT FM CR 142 TO CR 814 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.00 MANAGER: J. GARLAND (M) SEND LGPA WHEN PROJECT IS ADDED TO CWP
ATLANTA flp f DO 31
CONG DIST. -,:7
ADMIN FUND SOURCE: SURFA2kji4~SPORT.
FEDERAL HIGHWAY
FUNDS
PE 1996 ROW LOCL CONST
$
103
AFTER 97
GEORGIA DEPARTMENT OF TRJ\NSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 20
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P .I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
----------------------------------------------------------------
DOUGLAS CR 24/N BURNT HICKORY RD@ GOTHARD
.---------A-T-L-A-N-T-A--T-I-P--i--D-O--4-1---------------------P-E---1-9-92------U-N-D-ER-W--AY
751970 REPLACEMENT OF THE EXISTING BRIDGES($).
CONG DIST. 7
ROW LOCL
PROJECT MILEAGE : .00
CONST 1995 $ 386
MANAGER: D'. GODWIN
FUND SOURCE: BRIDGE PROGRAM
FED SHARE$ 309
STATUS: DOUGLAS COUNTY SIGNED ROW, UTIL &
FEDERAL HIGHWAYADMIN FUNDS
GA. SHARE$
77
0TH SHARE$
DOUGLAS 770162
STATUS:
CR 39/0LD ALABAMA RD@ REPLACEMENT OF THE EXISTING ~~-~~-~~,w PROJECT MILEAGE: .00 MANAGER: D. GODWIN
DOUGLAS COUNTY SGN DO
ATLANTA TIP i DO 39
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1992 UNDERWAY ROW LOCL CONST 1996 $ 644
FED SHARE$ 515 GA. SHARE$ : 129
0TH SHARE$
DOUGLAS 7B1394
STATUS:
COUNTY OPERATED
TRANSIT FACILITIES/
FUNDS RECIPIENT: DOUGLAS
MANAGER: STEVE KISH
.
CONG DIST. 7
OPERATING 1995 $
18 .
FUND SOURCE: RURAL TRANSIT
FED SHARE$
66
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE$
18
DOUGLAS 7B1395
STATUS:
COUNTY OPERATED PUBLIC VANPOOL SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH
DOUGLAS 7D7032
STATUS:
TRANSIT PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH LGPA NOT APPLICABLE
}/:'::cc1NG DIST_ . 7
OPERATING 1996 $
18
FUND SOURCE: RURAL TRANSIT
fED~~ TRANSIT ADMIN FUNDS
FED SHARE$
68
GA. SHARE $
0TH SHARE$
18
11
:::::: DIS~l ~
. ..;,
!:~~~s~~~Mi~ti~~) :... .CAPITAL 1995
$
FED SHARE$
GA. SHARE$
211 1_69
21
0TH SHARE$
21
DOUGLAS CAPITAL PROJECT 7D7033 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: DOUGLAS - COUNTY
MANAGER: STEVE KISH
STATUS: LGPA NOT APPLICABLE
:llig;:G DIST. 7.
:-:::::::-:::-
'
....
iwo souRcif:&il~
FEDERAL TRANSIT
1996
$
211
FED SHARE$
169
GA. SHARE$
21
0TH SHARE$
21
DOUGLAS 7V1020
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY MANAGER: STEVE KISH
CO~G DIST. ''''7
FUND SOURCE: FEDERAL TRANSIT
CAPITAL 1995
$
11
FUND FED SHARE $
9
GA. SHARE $
1
0TH SHARE $
1
'
-
~
~
I&.:~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 21
FISCAL YEAR
COST ESTS
DOUGLAS 7V1021
STATUS:
ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DOUGLAS MANAGER: STEVE KISH
CONG DIST. 7
CAPITAL 1996
$
12
FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$
10
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
GEORGIA DEPAR'l'MENT OF TRANSPORTATION
LL-~eo-1~:,q
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 22
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
F-A--Y-E-T-T-E---S-R--54-F-M--M-C-D-O-N-O-U-G-H--R-D--N-E--T-O--S-R--7-/-U-S--------------------c-o-.---------A-T-L-A-N-T-A--T-I-P--i--C--L-4-1-/F-Y-1-0------------------PE---1-9-9-6-----$-----1-44
721440 RECONSTRUCTION & WIDENING FROM 2 LANES
CONG DIST. 3
ROW
AFTER 97
-PROJECT MILEAGE : 5.53
CONST
AFTER 97
MANAGER: M. REYNOLDS (M)
FUND SOURCE: NAT'L HIGHWAY
STATUS: REQ ~LAYTON DO UTIL 4-23-92; FAYETTE
FEDERAL HIGHWAY ADMIN FUNDS
72144X IS AN ASSOCIATED PROJECT.
\
~
C!l!:ll':Ml
~
~:~
t
.....1.,.a , --.-,.
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 712360
STATUS:
I-285@ WASHINGTON RD/INCL WDN WASHINGTQ_RD 600' W OF BR
INTERCHANGE / RECST. OR REHAB.
-: : : -_
PROJECT MILEAGE : . 00 - EXIST. LANES: 4 )t:RQPOSED LANES: 5
MANAGER: BILL MOSKAL
SIGNED CITY OF EAST POINT 3-16-87 FOR
ATLANTA TIP i FS 17
CONG DIST. 5
FUND SOURCE: I-STATE MAINT, FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 23
FISCAL YEAR
COST ESTS
PE 1988
UNDERWAY
ROW 1991
UNDERWAY
CONST 1996
$ 1651
FED SHARE $ 1486
GA. SHARE $
165
0TH SHARE $
FULTON 712940
I-75@ MT PARAN ROAD
PINRTOEJRECCHTANMGILEEA/ GEREC: ST. 0. 0OR- EREXHISA'Bl'.) t--J--W-----E---S---: O /PROPOSED J..:.].i..t,E_;,:_S: O
STATUS: =A1~~;A ~gs;TIL 8-2471;:}i f&fi~N N/A
ATLANTA TIP i R 105
CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW 1995
$
500
CONST 1995
$ 2200
FED SHARE $ 1760
GA. SHARE $ 440
0TH SHARE $
FULTON 712950
STATUS:
;:~~~~~i~E~G~~s~oo ~i~~: I-85 @ MONROE DRI:/' 0::
LANES: 0 /PROPOs~$:~Is: 0
cotAffi t;k7
=A1~~~;A ~gs;TILITIEs 0:1'1+~?:l?!,,:X.ON
ATLANTA TIP i R 106
CONG DIST. 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL -HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW 1995
$
50
CONST 1996
$ 2200
FED SHARE $ 1760
GA. SHARE $
440
0TH SHARE $
FULTON 71297Z
STATUS:
FULTON 713030
STATUS:
HOV LUMP SUM SIGNING ON I-75 & I-85 METRO HOV LANES/ SAFETY PROJECT MILEAGE : -.00 - EXIST. LANES: 0 MANAGER: BURT RIDDLE
FUND SOURCE: I-STATE MAINT,
FEDERAL HIGHWAY ADMIN FUNDS
4l2~}(fts AN ASSOCIATED PROJECT.
,,-.
)
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1995 $
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE FOR DESIGN OF NEW I-285 SR 400 INTERCHANGE
:rift INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : ,00 - EXIST,
LANES:
8
/PROPOSED
LANES:
MANAGER: NEIL DAVIS (CM)
SEND LGPA WHEN CONSTRUCTION PHASE IS ADDED
PE 1995
.tcoNG Dis-rl :;
__ :: __ _
;ibJhM - FUN~:$8t.ffi8~: DEMONSTRATf(M
ROW NONE CONST NONE
FEDERAL(ifi:GHWAY ADMIN
$ 2000
$
0
$
0
FULTON 713075
STATUS:
I-285 EB, 40 SIGNS FM JONESBORO RD TO GLENWOOD RD . DEKALB SIGNING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK NOT APPLICABLE
FULTON 713080
STATUS:
I-285 NB .. 11,255 SQ FT SIGN REHAB FM MP 1.0 TO I-20 SIGNING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE NOT APPLICABLE
PE NONE $
0
ROW NONE $
0
-:.:-c<CONST 1995 $
FUND SOURC:if}ll~TATE MAINT.
FED SHARE$
> FED~-~ Jt:i.:_q#,WAY ADMIN FUNDS:; t:
GA. SHARE$
256 256
71307J(:ts:~ ASSOCIATED PRCi.Jtct:
-. ....
.<-=:-:-::_:
0TH SHARE$
l h ATLANTA
i R 130 _, .( ; :
CONG DIST. -":5
FUND SOURCE: I-STii:~k::1:~~T. FEDERAL HIGHWAY ADMI~ FUNDS
PE NONE $
0
ROW NONE $
0
CONST 1995 $ 286
FED SHARE $ 286
GA. SHARE $
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
FULTON 713085
STATUS:
I-20 WB 61 SIGNS FROM SIGNING/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK NOT APPLICABLE
EXIST.
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ATLANTA TIP i R 130
CONG DIST. 5
FUND SOURCE: I-STATE.MAINT. FEDERAL HIGHWAY ADMIN FUNDS
FULTON 71309Z
STATUS:
I-85 NB 62 SIGNS FROM I-285 IGNING / MAINTENANCE PROJECT MILEAGE : 00 MANAGER: L. SEABROOK
FULTON 713125
STATUS:
20 VARIABLE MESSAGE SIGNING/ SAFETY PROJECT MILEAGE : .00 MANAGER: BURT RIDDLE
NOT APPLICABLE
ATLANTA TIP i R 130
CONG DIST . 5
FUNDSOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 713090 IS AN ASSOCIATED PROJECT.
ATLANTA TIP i R 166
CONG DIST. 5
0
FOND SOURCE: CONG MIT. /AIR QUAL. FEDERAL HIGHWAY ADMIN FUNDS
FULTON 713137
STATUS:
I-75 COMMUNICATION CONDUIT & CABLE FM I-85 TO
MISCELLANEOUS IMPROVEMENTS/ SAFETY
PROJECT MILEAGE: 2.55 - EXIST. LANES: o /PROPoszb}ii&is: o
MANAGER: BURT RIDDLE
NOT APPLICABLE
:.
/&,NG DIST. 5
\ ;UNO SOURCE: CONG MIT./AIR QOAL FEDERAL HIGHWAY ADMIN FONDS
FULTON 713140
STATUS:
COMMUNICATION CABLE ON I-85 FM I-75 NORTH MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : 2.97 - EXIST. LANES: 0 /PROPOSED MANAGER: BURT RIDDLE NOT APPLICABLE.
g/IIJ : ATLANTA Ttitt R 168 ::coNG oI_stW , 5
_
~:~~i~!~wi~Ni:~~;~~!!~8tiA
FULTON 713142
STATUS:
COMMUNICATION CABLE ON I-85 FM SR 400 NORTH TO I-285/DEKALB MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : 7.95 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE NOT APPLICABLE
22-Feb-1994 Page 24
FISCAL YEAR
COST ESTS
PE NONE $
ROW NONE $
CONST 1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0
363. 363
PE }'0~11":
$
0
ROW :-:,, 'l-~
$ .
0
CONST l'ES
$
0
FED SHARE$
GA. SHARE$
0TH SHARE $.
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $ GA. SHARE $ 0TH SHARE $
0 0 7520 6016 1504
PE NONE
$
ROW NONE $
CONST 1995 $
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 2300 1840 460
PE NONE $ ROW NONE $
CONST 1995 $
FED SHARE $ GA. SHARE $ 0TH SHARE $
0 0 1700 1360 340
0
0 5300 4240 1060
FULTON 713147
STATUS:
I-75 COMMUNICATION CABLE ON I-75 FM NORTHSIDE DR TO I-285 MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .-7 .13 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE NOT APPLICABLE
CONG DI:::5 & 6
FUND SOURCE: CONG~ff:1/~IR QUAL FEDERAL HIGHWAY ADMiNFUNDS 71314X IS AN ASSO\:fJ:A~ED PROJECT.
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
1062 850
212
I.
~
d'-3~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 713150
STATUS:
COMMUNICATION CABLE ON I-75 FROM I-285 ~.ORTH TO I-85 MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : 6.00 - EXIST. LANES: 0 :::!PROPOSED LANES : 0
MANAGER: BURT RIDDLE NOT APPLICABLE
ATLANTA TIP# R 170 CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
:1;&. FULTON COMMUNICATION CABLE I-20 FROM r.iif!ILAPITOL
713155 MISCELLANEOUS IMPROVEMENTS / SAf'tf'.f'}
PROJECT MILEAGE : 6. 71 EXIST/::'f:Jillts: 0 /PROPOSED
0
MANAGER: BURT RIDDLE
STATUS: NOT APPLICABLE
CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS 71315X IS AN ASSOCIATED PROJECT.
FULTON 713157
STATUS:
COMMUNICATION CABLE ilJat{oM CAPITOL AVENUE TO I+.Jes16EKALB MISCELLANEOUS IMPROVEMENTS./ SAFETY PROJECT MILEAGE : 9.70 - EXIST. LANES: 0 /PROPO$itrmES: 0 MANAGER: BURT RIDDLE NOT APPLICABLE
CONG DIST. 11 & 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
FULTON. 713230
STATUS:
I-285@ RIVERSIDE DR; TURN LANES & BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: BEN BUCHAN SEND LGPA IN 1995
DIST. 5-_
FUND SOURCE: I-STATE MAINT. FEDER.AI, HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 25
FISCAL YEAR
COST ESTS
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 2100 1680 420
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 4400 3520
880
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0
0 6400 5120 1280
PE 1995 ROW 1996 CONST
$
130
$ 1000
AFTER 97
FULTON 713330
STATUS:
I-285 SOUTH TO I-20 WEST RAMP GEOMETRY WEST .OF
;-:~~T~i~iAG~R:~~_: EXIST. LANES: 2 /PROPOSED LANEsi:rn<t MANAGER:D. SMITH SEND LGPA IN 1996
FULTON 720570
STATUS:
BANKHEAD HWY/SR 8 FM PROCTOR CRK TOE OF SCL RR BRIDGE RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .44 MANAGER: BILL MOSKAL (M) CITY OF ATLANTA SIGNED 9/6/89 FOR UTILITIES
FULTON 720980
STATUS:
SR 138/ RELOC FM 5 LN@ BETHSAIDA RD TO SR 279/0'NATL HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.87 MANAGER: D. GODWIN DOT TO PAY UTILITIES 8-27-92
!Iil~~;~si~P 5!:ftf'::::~i!i
:dko SOURct'f!J1'.~ L
FEDERAL .li!C;J!.WAY AOMIN
1
ATL~:~: ] ~: f CONG DIST . ..,6
FUND SOURCE: FEDERAL HIGHWAY
PE 1995 ROW 1997 CONST
$
50
$
100
AFTER 97
PE 1993 ROW 1997
sUNDERWAY 1104 AFTER 97
PE NONE
$
0
ROW 1990 UNDERWAY
CONST 1995
$ 6616
FED SHARE $ 5293
GA. SHARE $ 1323
0TH SHARE $
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 26
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
-------------------------------------------------------------------------------------------------- .--------------------------------
FULTON STATE BRIDGE RD FM ALPHA CT/SR 400 TO PAJ:U< BR PKWY
ATLANTA TIP i FN 15
PE NONE
$
0
720990 RECONSTRUCTION & WIDENING FROM 2 LANES 19:4 LANES.
CONG DIST. 6
ROW 1992
UNDERWAY
PROJECT MILEAGE-: 2.14
CONST 1996
$ 8998
MANAGER: NEIL DAVIS
FUND SOURCE: SURFACE TRANSPORT.
FED SHARE $ 7198
STATUS: REQ FULTON ROW/UTIL 12/92;ALPHARETTA $G~liBWl~uB UTL 2/93
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $ 1800
0TH SHARE $
Ai;.t%f~ FULTON SR 9 @ C' HOOCHEE RVR/ INCL INT @
RIVERSI~i:i 72Y460
721460 REHAB. OF THE EXISTING BRIDGE ($.)lrtioM 4 LANES TO BLANES.
STATUS: ~~i~~~~:~~fa~~;lcOqNj~i~;~B UTIL 12-2-91
FULTON 721510
STATUS:
.A SR 120/ALPHARETTA FM'ik'.J)i'.mIN ST EASTERLY TO SR
RECONSTRUCTION & WIDENil'IG>FROM 2 LANES TO 6 PROJECT MILEAGE : 1.33 MANAGER: NEIL DAVIS (C) REQ CITY OF ALPHARETTA DO
ATLANTA TIP i FN 7 CONG DIST. 6
FUND_ SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72Y460 IS AN. ASSOCIATED PROJECT.
ATLANTA TIP i FN 16 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS. 72Y510 IS AN ASSOCIATED PROJECT.
PE 1993 ROW 1996 CONST
UNDERWAY $ 1473 AFTER 97
PE 1993 UNDERWAY
ROW 1994
UNDERWAY
CONST 1996 $ 3900
FED SHARE $ 3120
GA. SHARE $
780
0TH SHARE $
FULTON 721560
STATUS:
~c~!,~!u~iI;~ ~Rw~~!N~~~F:o~L~P~!!T~oT~ ~;!~FJ'a1:~k~
~;!i~:M~~E~~w~/. 60
DOT WILL PAY UTILITIES 11-10-92
FULTON 721750
STATUS:
SR 3/NORTHSIDE OR@ BANKHEAD HWY; @ NORTH AVE;@ ..i-1ARIETTA
INTERSECTION IMPROVEMENT / RECST. OR REHAB.
.
:t PROJECT MILEAGE : 7 5 - EXIST. LANES: 2 /PROPOSED LANES_f:
=A~~~~/:T~~! & FULTON co 00 PUBLIC UTIL . 9-20-91
FULTON 721790
STATUS:
SR 9/S MAIN ST FM UPPER HAMBREE RD TO ACADEMY ST RECONSTRUCTION & WIDENING FROM 2 .LANES TO 4 LANES.
PROJECT MILEAGE. : 1. 70 MANAGER: NEIL DAVIS (CM) ALPHARETTA TO BUY ALL ROW OVER $1, 598.. SEND LGPA IN 1996
Ti; @;~~~si~P5i FS 31
(: :UNO SOURCE: SURFACE TRANSPORT. f~D.E:RAL HIGHWAY ADMIN FUNDS
t~~~;:;'li AT 76
FUN~0~6ik8[ NAT'L HIGHWA;j)U
FEoEfill.t HIGHWAY ADMIN t@bs
-
..::'...::.;-:
PE NONE $
0
ROW 1992
UNDERWAY
CONST 1995 $ 5064
FED SHARE $ 4051
GA. SHARE $ 1013
0TH SHARE $
PE 1993 UNDERWAY
ROW 1994
$ 1430
CONST 1995
$ 1130
FED SHARE $
904
GA. SHARE $ 226
0TH SHARE $
,1j;i~~ts~:.~i,1;1fil*
PE 1993 ROW 1997
/< FUND SOURciT. si!:CE TRANs~JJ4}
CONST
FEDERAL H!Gll.WAY ADMIN FUNDS/' ..
UNDERWAY $ 1598 AFTER 97
FULTON 721810
STATUS:
SR 166/LAKEWOOD FWY@ GREENBRIAR PKWY/CAMPBELLTON RD MI.9.37 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE: .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. CHURCH (M) SEND LGPA WHEN PROJECT IS ADDED TO CWP
ATLANTA f'tg i AT 62
CONG DIST. 5
AD~IN FUND SOURCE: NAT 1 i'tfda~AY
FEDERAL HIGHWAY
FUNDS
PE 1995 ROW
CONST
$ 198 AFTER 97 AFTER 97
l!D=i:.J
~
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 721840
STATUS:
FREEDOM PKWY/SR 10 FM I-75/I-85 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 2.00 - EXIST, MANAGER: NEIL DAVIS NOT APPLICABLE
P.D.L LANES: 4
ATLANTA TIP f AT-R 41 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 27
FISCAL YEAR
COST ESTS
PE NONE
$
ROW NONE $
CONST 1995 $
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 2000 1600 400
FULTON 721850
STATUS:
SR 400@ HAMMOND, ABERNATHY, INTERCHANGE/ RECST, OR PROJECT MILEAGE : ,00 MANAGER: NEIL DAVIS (CM) CONTRACT REQ CO PE, ROW,
ATLANTA TIP f FN-R 100
PE 1993 UNDERWAY
CONG DIST. 5
ROW 1995 $ 4000
14
CONST 1997 $ 30000
FUND SOURCE: NAT'L HIGHWAY
FED SHARE $ 24000
FEDERAL HIGHWAY ADMIN FUNDS
GA, SHARE $ 1100
72Y850 IS AN ASSOCIATED PROJECT.
0TH SHARE $ 4900
FULTON 721920
STATUS:
SR 140/HOLCOMB TURN LANES/ SAFETY PROJECT MILEAGE : .17 MANAGER: D. GODWIN CONTACT TRAFFIC OPERATIONS
ATLANTA TIP f FN 87
CONG DIST. 6
5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
PE 1994 UNDERWAY
ROW LOCL
CONST 1996 $
56
FED SHARE $
56
GA. SHARE $
0TH SHARE $
FULTON 721930
STATUS:
SR 120 AT STATE BRIDGE ROAD TURN LANES/ SAFETY PROJECT MILEAGE : .00 - EXIST, MANAGER: NEIL DAVIS CONTACT TRAFFIC OPERATIONS
FULTON 72Y510
STATUS:
SR 120/ALPHARETTA FM SR 9 TO SR 400; FOR REST
$;
RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES.
PROJECT MILEAGE : 1.33
MANAGER:
SEE 721510
FULTON 72Y850
STATUS:
SR 400@ HAMMOND, ABERNATHY, CD SYS;PARTIAL R/W FOR 721850 UNKNOWN/ UNKNOWN PROJECT MILEAGE ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
'~ ATLAN::);J~)t FN 16
:':'/'/:'CONG DIST}/$
tsui8fu; F~:~/
>>. SURFACE TPANSP()RT
PE NONE $ ROW 1995 $ CONST 1996 $
FED SHARE $ GA. SHARE $ 0TH SHARE $
PE NONE $ ROW 1995 $ CONST NONE $
~~~fffl
..:::::::::-
r
:
f
!
I
:
w
!
~
s
~
~
f
~~~
. ......
~
..
~~ .
~
J
E
C
T
.
.
..:
\
A TIP t .FN ....
PE NONE
$
DIST. 5{)( .
ROW 1996 $
::::\tbNST NONE .C.... ':'.i.::C0
Ftfuo souRcitt5f, L HIGHWAY , rn
$
~~~j~f~~.ffl~f~s~~!~E~u;~i~8fl
0 10 156 156
0 3000
0
0
4850
0
FULTON 730753
STATUS:
SOUTH FULTON PKWY FM COCHRAN MILL RD TO SR 154 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: G. ROSS CO SGN 12/89 ROW/UTIL/DESIGN; REQ CITY DO CITY UTIL 5-17-92
ATLANT~\fip f FS 36
:::: ::::~:: suRFi2l!i!RANsPoRT.
FEDERAL HIGHWAY AriMIN FUNDS
PE LOCL ROW LOCL CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
4600 3680
920
COUNTY P;I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM . PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 730885
STATUS:
STATE BRIDGE RD@ JOHN'S CRK REHAB. OF.THE EXISTING BRIDGE($). FROM PROJECT MILEAGE : . 00 MANAGER: NEIL DAVIS FULTON COUNTY SIGNED 2/21/90 FOR
LANES.
ATLANTA TIP# FN 71 CONG DIST. 6
FUND.SOURCE: .BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
;u-Feb-1YY4 Page 28
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW LOCL
CONST 1996
$
288
FED SHARE$ 230
GA. SHARE$
5~
0TH SHARE$
FULTON 730960
STATUS:
CR 1374/BUTNER RD@ DEEP CREEK REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .19 MANAGER: D, GODWIN
REQ COUNTY DO ROW,
ATLANTA TIP# FS 62 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1996
$
332
FED SHARE$ 266
GA. SHARE$
66
0TH SHARE$
FULTON 731420
STATUS:
SR 120/Jl.i."BOTTS TURN LANES/ SAFETY PROJECT MILEAGE : ,00 MANAGER: D, GODWIN CONTACT-TRAFFIC OPERATIONS
ATLANTA TIP# FN 3 CONG DIST.. 6. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
. PE 1994
UNDERWAY
ROW 1995
$
10
CONST 1996
$
406
FED SHARE $
365
GA. SHARE $.
41
. 0TH SHARE $
FULTON 731430
STATUS:
STATE BRIDGE ROAD FM ALPHA LANDSCAPING/ ENHANCEMENT PROJECT:MILEAGE : 2.34 - EXIST. LANES:
MANAGER: NEIL DAVIS NOT APPLICABLE
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW NONE $
0
CONST .1996 . $
288
FED SHARE$
230
GA. SHARE$
50
. 0TH SHARE$
FULTON 742482
STATUS:
SR 166/LAKEWOOD FWY EB EXIT RAMP @ SYLVAN RD INTERSECTION IMPROVEMENT / SAFETY PROJECT MILEAGE : .00 --EXIST. LANES: 4 /PROPOSED LANESi<f){{:C
MANAGER= o: GODWIN T&S SENT TO EAST POiNT AND ATLANTA - NO SGN COPY
Bf8/
. ATLANTA Tfii.t AT-Rll6 : (CONG DIST}g
n:::: : .. ..
F~:M:;w@J = HWY.. SAFET.t:
FEDiAAL,iiIGHWAY ADMIN?:ttiNDS
PE NONE
$
0
ROW NONE $
0
CONST 1996
$
143
FED SHARE $ 129
.. _.GA. SHARE $'
14
OTH,SHARE $
FULTON 74280X
STATUS:
LOWER RIVER RD FM SR 92/FAIRBURN RD TO COBB CO LINE/DOUGLAS
UNKNOWN/ 1.JNKNOWN. PROJECT MILEAGE :. ; 00 .- EXIST: LANES: 0 /PROPOSED LANES: 0 MANAGER: . UNKNOWN
.od Ai.ANTA TIP*
.CONG DIST; 7 _..:.::::-'
;MJ;;, souRcii\F g&fu-AcE TRANSPcik'J ! FEDERAL .ltfoH.WAY ADM IN FUNDS fr ) . 742800 :ts\filf ASSOCIATED PRO',#cT>
PE 1996 ROW LOCL {CONST
$
0
AFTER 97
FULTON 750780
STATUS:
BANKHEAD HWY/SR 8 FM HARWELL RD TO SR 280/HIGHTOWER RD
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 1,25
MANAGER: D. SMITH . (M)
SEND LGPA.IN 1997
.
ATLANT~\~iP # AT 1 CONG DIST. 5
FFUEDNDERASOLUHRICGEH:WASYURioFMAdI/N:iAFAUNNSDPSORT. ,; ,,_
PE 1995 ROW -1997 CONST
$
100
$ 300
AFTER 97'
~
~
~
f,,
-
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 751140
STATUS:
WASHINGTON RD/E.POINT FM DELOWE DR TO LEGION WAY RECONSTRUCTION & WIDENING FROM 2 LANES T0::5 LANES. PROJECT MILEAGE : ,90 MANAGER: BILL MOSKAL (M) SIGNED BY EAST POINT 9-25-85 FOR ROW & j}f~#f4tES
ATLANTA TIP# FS 25 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
'. . . . 1~- . -~
22-Feb-1994 Page 29
FISCAL YEAR
COST EST$
PE 1996 ROW LOCL CONST
$
100
AFTER 97
FULTON 751146
STATUS:
WASHINGTON RD/E POINT FM I-285 RECONSTRUCTION & WIDENING FROM PROJECT MILEAGE : .80
MANAGER: BILL MOSKAL (CM .-::::c-::::-.-:-:-:-:-:-:-::::::0::::- SIGNED BY EAST POINT 9-2~.,#3~/R R/W & UTILITIES
ATLANTA TIP# FS 17 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
100
AFTER 97
FULTON 751410
STATUS:
ATLANTA TIP# FN 48 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW 1997 CONST
$
101
$ 7454
AFTER 97
FULTON 751560
STATUS:
HOWELL MILL RD/ATLANTA FM RECONSTRUCTION & WIDENING PROJECT MILEAGE : .10 MANAGER: D. CHURCH (M) SEND LGPA WHEN PROJECT IS ADDED TO CWP
SOURCE: SURFACE TRANSPORT. HIGHWAY ADMIN FUNDS
::::=:::{tt:: ..
PE 1996 ROW LOCL CONST
$
9
AFTER 97
FULTON 751900
STATUS:
SR 14/US 29/PETERS ST @ L&N AND C OF G RR APPR. MI N/I-20.::: REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
:~t~~~~/!~~~iH: PROJECT MILEAGE : ,00 UTIL & FULTON DO CO-OWNED UTIL 2-4J~~i :(
ATLANTA T~t;.# AT 71
PE 1992 UNDERWAY
:C:QNG DI~T/ 5
ROW NONE
$
0
1Jl2fu: 1
FU;i
BRIDGE PROGRAM>:
CONST 1996
$ 3729
FED SHARE $ 2983
FEDERAL HIGHWAY AtiMIN FUND$
:
GA. SHARE $
746
750455/ts AN ASSOCIATED:PROJECT._ ?
0TH SHARE $
FULTON 752015
STATUS:
COURTLAND ST OVER CSX RR REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .10 MANAGER: BEN BUCHAN REQ CITY/ATLANTA DO ROW, UTIL & DETOURS 10/92 (SEE #752010)
FULTON 752020
STATUS:
PEACHTREE ST@ GEORGIA RR & MARTA AT UNDERGROUND ATLANTA REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: BEN BUCHAN REQ CO DO PUB UTIL, CITY DO ROW & UTIL 5-3-93
j :f~~~~si:P5!,:ft]tf)
PE NONE
$
0
ROW LOCL
-;at6 souRckiikiDGE PROGRAM'\\:\\ t.:c:1.c<
1996
$
FED SHARE $
685 548
FEDERAL il!GHW.A.Y ADMIN
GA. SHARE $
137
0TH SHARE $
1
AT~:~ ~[ # CONG DIST. -:::,5
FUND SOURCE: FEDERAL HIGHWAY
PE 1992
UNDERWAY
ROW LOCL
CONST 1997
$ 1650
FED SHARE $ 1320
GA. SHARE $
330
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 752030
STATUS:
INTERU:'\.'.CIONAL BLVD @ CSX & NORFOLK-SOUTHERN RR @ THE OMNI
REPLACEMENT OF THE EXISTING BRIDGES (S) t,tq ADDED LANES.
PROJECT MILEAGE : . 00
..
uffD =A;~~~o:E~OB~g~TIL, CITY DO ROW &
1\i3-93
ATLANTA TIP t AT 68
CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAYADMIN FUNDS
22-Feb-1994 Page 30
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW LOCL
CONST 1997
$ 1580
FED SHARE $ 1264
GA. SHARE $
316
0TH SHARE $
FULTON 752040
STATUS:
FULTON 752070
STATUS:
ROXBORO RD FM E PACES FERRY
BRIDGES/ REPLACEMENT
PROJECT MILEAGE : .20
=A~~~~ 9~E~QD~~i~- i;Mio~J
Mifti? &
PE;REQ
co
PUB
1
uTftl/ 2;91
-~:~LO SR 139 @ FAIRBURN RD;'ffi:ifoRST DR;FM FLORIDA AV TO
INTERSECTION IMPROVEMEN1\{'/\,.RECST. OR REHAB.
'
PROJECT MILEAGE : 55 - Ejt:i:ST. LANES: 4 /PROPOSl!:b)~l!:S: 5
MANAGER: D. GODWIN
....
REQ. ATLANTA DO UTIL AND COUNT'.(
ATLANTA TIP f AT 9 CONG DIST. 4 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1996 ROW LOCL CONST
$
50
AFTER 97
ATLANTA TIP f AT 79
PE LOCL
CONG DIST . 5
ROW LOCL
CONST 1995
$
563
FUND SOURCE: DEMONSTRATION PROGRAM
FED SHARE$
450
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
113
0TH SHARE$
FULTON 752082
STATUS:
CENTRAL AVENUE OVER CSX RAILROAD
REHAB. OF THE EXISTING BRIDGE (S). FROM 2 LANES TO .,t
PROJECT MILEAGE: .00
MANAGER: BEN BUCHAN REQ CITY OF ATLANTA DO ROW, UTILITIES &
ATLANTA TIP t AT 85
~ONG DIST. 5
'J;UND SOURCE: BRIDGE PROGRAM . FEDERAL HIGHWAY ADMIN FUNDS
PE 1993 UNDERWAY
ROW LOCL
CONST 1997
$
755
FED SHARE $
604
GA. SHARE $
151
0TH SHARE $
FULTON 752084
STATUS:
FULTON 752086
STATUS:
FULTON 752130
STATUS:
TECHWOOD DR OVER CSX RAILROAD & NORFOLK-SOUTHE;~\RAILWAY REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANE9i PROJECT MILEAGE : .00
=A~~~~ ~:NA~~ DO ROW, UTILITIES & DETOURS 10-20-9~:: :/
SPRING STREET OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT-MILEAGE : .00 MANAGER: BEN BUCHAN REQ CITY OF ATLANTA DO ROW, UTILITIES & DETOURS 10-20-92
AUBURN AVENUE PEDESTRIAN SYSTEM FM PARK PL TO BOULEVARD BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : 1.20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D.CRANFORD REQ FULTON DO PUB UTIL & ATLANTA DO ROW & UTIL 9-22-92 (HOLD
\:~;~~~si~!:~f AT 87
~:~~~~~~w!~I~~I:f~g~e
/!: i~~~si~P t rilt!li :}) 5
iJ:b souRcif(:lif~GE PROGRAM
FEDERAL lifGk~AY ADMIN
iiii'
t, ATLANT:\f f
CONG DIST. :5
FUND SOURCE: FEDERAL HIGHWAY
PE 1993 UNDERWAY
ROW LOCL
CONST 1996
$
843
FED SHARE $
674
GA. SHARE $
169
0TH SHARE $
PE 1993 UNDERWAY
ROW LOCL
1996
$
843
FED SHARE $
674
GA. SHARE $
169
0TH SHARE $
PE LOCL
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE. $
0TH SHARE $
0 1000
800
200
-
~
~
,.
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 31
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P. I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
--------------------------- ------------------------------------------------------------------------------------------------------
FULTON PEACHTREE ST PEDESTRIAN SYSTEM FM
PINE ST
ATLANTA TIP# AT-R 143
PE LOCL
752140 BICYCLE/PED. FACILITY/ ENHANCEMENT
CONG DIST. 5
ROW NONE
$
0
PROJECT MILEAGE : 4.70 - EXIST. LANES:
0
CONST 1995
$ 5925
MANAGER: D. CRANFORD
FUND SOURCE: TRANS. ENHANCE.
FED SHARE $ 4740
STATUS: TO BE DONE BY CONTRACT
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE $
0TH SHARE $ 1185
FULTON 752150
STATUS:
WINDSOR PARKWAY AT NANCY REHAB. OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: D. GODWIN REQ COUNTY DO
FULTON 752160 STATUS:
GLENWOOD AVE FROM ~~~~,ri~',J,wT
CONSTRUCTION OF NEW u, PROJECT MILEAGE : .30 MANAGER: G. ROSS REQ FULTON DO PUB UTIL,
ATLANTA TIP# FN 21 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP# AT 57 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
PE 1993
UNDERWAY
ROW LOCL
CONST 1995
$
100
FED SHARE $
80
GA. SHARE $
20
0TH SHARE $
PE 1993
UNDERWAY
ROW LOCL
CONST 1995
$
288
FED SHARE $
230
GA. SHARE $
58
0TH SHARE $
FULTON 752230
STATUS:
SR 54/JONESBORO RD. OVER THE SOUTH RIVER IN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED PROJECT MILEAGE : .00 MANAGER: D. GODWIN (M) REQ CITY OF ATLANTA DO UTILITIES 12-1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 752320
STATUS:
POWERS FERRY RD/CR 300 OVER LONG ISLAND CREEK
... '" , ATLANT:j:t,. FN 85
REHAB. OF THE EXISTING BRIDGE (S). FROM 2 LANES TO 4 LANEsf/' ,,::crr::coNG DIST:c/)5
PROJECT MILEAGE : .00 MANAGER: D. GODWIN (M)
FUND JB&i.{C:f: BRIDGE PRoc;fG;h}
SEND LGPA IN 1995
FEDJtii:iu:Ylh:GHWAY ADMIN FUNDS
FULTON 752520
STATUS:
CS 1985/MITCHELL STREET @ SOUTHERN RAILROAD .2. MI W OF SR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
3E
PROJECT MILEAGE : . 2.9
MANAGER: BEN BUCHAN (M)
SEND LGPA IN 1994 TO ATLANTA FOR ROW & UTILITIES
i:il!li!!jg~: DIST. 5
;bk~ souRciiftf~GE
FEDERAL .Jtrfaiw.il.Y
PE 1995
$
24
ROW 1995 $
1
CONST 1996
$
975
FED SHARE $
780
GA. SHARE $
195
0TH SHARE $
PE 1994
UNDERWAY
ROW LOCL
CONST 1997
$
446
FED SHARE $
357
GA. SHARE $
89
0TH SHARE $
PE 1995
$
ROW LOCL
1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
50
2380 1904
476
FULTON 752540
STATUS:
CS 2661/HOLLYWOOD ROAD@ PROCTOR CREEK 1.8 MIN OF JCT US 78 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .20 MANAGER: UNKNOWN SEND LGPA 10/94
FUND SOURCE: FEDERAL HIGHWAY
PE 1995 $
8
ROW LOCL
CONST 1997
$
445
FED SHARE $
356
GA. SHARE $
89
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 752545
STATUS:
CR 1349/FAIRBURN ROAD@ CSX RAILROAD REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .22 MANAGER: UNKNOWN SEND LGPA 10/94
CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 752550
STATUS:
CS 1259/LAKEWOOD AVE. @ REPLACEMENT OF THE EXISTING PROJECT MILEAGE : 22 . -
MANAGER: D. GODWIN SEND LGPA 10/94
SR CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 752560
STATUS:
CS 3586/SPRING REPLACEMENT OF THE PROJECT MILEAGE : . 48 MANAGER: D. GODWIN SEND LGP~ 10/94
CONG DIST . 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 770270
STATUS:
CS 6351/DESERT DR@ CAMP CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: D. GODWIN E. POINT SGN 11-3-92 ROW/UTIL/DETOURS;
~i:#f / NO ADDED
: :
,.Ac..'..oTLANNGTDAISTTI.P5i FS 66 t,_:,.,.,.,.,,.,.,.,.,.,''.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
FULTON 770274
STATUS:
CR 593/0LD BILL COOK RD NE OF UNION CITY@
REPLACEMENT OF 'rHE EXISTING BRIDGES (S). NO
PROJECT MILEAGE : 00
MANAGER: D. GODWIN.
REQ FULTON DO ROW, UTILITI~S & DETOURS 8-24-92
s ATLANTA Tit :i FS 63
C..ONG ors> ..,,.:.;-.:-,:--:-:.-:
F~~ M!Mt:Ji: BRIDGE PROGr&u }
FEDERAi jfi:GHWAY ADM IN FUNDS
FULTON 770276
STATUS:
FORSYTH ST/C.S. 2038 OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .00 MANAGER: BEN BUCHAN REV REQ ATLANTA DO UTILITIES & PAY 20% OF ROW COST 1-24-94
Kir'~TA TIP i Ainlht
<ii2PNG DIST. 5 /
FUND SOURcf{' aidoGE PROGRAM
FEDERAL., ftfoiJ1iliY ADMIN
FULTON 770277
STATUS:
PRYOR ST/CS 2044 OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 00 MANAGER: BEN BUCHAN REQ CITY OF ATLANTA DO ROW, UTILITIES & DETOURS 10-20-92
ATLANTA TiP i CONG DIST. ::5
FUND SOURCE: BRIO,GE. FEDERAL HIGHWAY
22-Feb-1994 Page 32
FISCAL YEAR
COST ESTS
PE 1995
$
20
ROW LOCL
CONST 1997
$
800
FED SHARE $
640
GA. SHARE $
160
0TH SHARE $
PE 1995 ROW LOCL CONST
$
23
AFTER 97
PE 1995 ROW LOCL CONST
$
211
AFTER 97
PE 1994
$
5
ROW LOCL
CONST 1995
$
214
FED SHARE $
171
GA. SHARE $
43
0TH SHARE $
PE 1995
$
5
ROW LOCL
CONST 1996
$
112
FED SHARE $
90
GA. SHARE $
22
0TH SHARE $
PE 1993
UNDERWAY
ROW 1994
$ 3000
1995
$ 1241
FED SHARE $
993
GA. SHARE $
248'
0TH SHARE $
PE 1993 UNDERWAY
ROW LOCL
CONST 1997
$
562
FED SHARE $
450
GA. SHARE $
112
0TH SHARE $
,.
=
COUNTY P .I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 770278
STATUS:
CR 485/ENON ROAD@ ENON CREEK N OF FAIRBURN REPLACEMENT OF THE EXISTING BRIDGES (S). .N.9. ADDED LANES. PROJECT MILEAGE : .20 MANAGER: D. GODWIN REQ FULTON DO ROW, UTILITIES &
ATLANTA TIP i FS 65 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 33
FISCAL YEAR
COST ESTS
PE 1994
UNDERWAY
ROW LOCL
CONST 1995
$
179
FED SHARE $
143
GA. SHARE $
36
0TH SHARE $
FULTON 770310
STATUS:
ATLANTA MULTI-MODAL PASSENGER TE&liWidY'. TRANSIT PROJECTS / NEW CONSTRUC.'J.'.foif{'
PROJECT MILEAGE : . 00 - EXIST{ :LANES: 0
~~~:\~N ~~~!R!E 9-8-"J:~rfUNDS:FHWA 31%,FTA 49iliL 20%
ATLANTA TIP i R 120 CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW 1994
$ 20000
CONST 1995
FED SHARE $ 84000
GA. SHARE $ 21000
0TH SHARE $
FULTON 770385
STATUS:
NORTHSIDE/GEORGIA Do~:$BKvEILLANCE PROJECT MISCELLANEOUS IMPROVEMEN1it. / SAFETY
. ,,..,,., ..... : ,.,.,.
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPosibJmfs: 0
MANAGER: BURT RIDDLE
NOT APPLICABLE
CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 760
608 152
FULTON 770395
STATUS:
ATLANTA TRANSPORTATION MANAGEMENT CENTER BUILDING FUJ!i.'fifsiJf\;fif'
MISCELLANEOUS IMPROVEMENTS/ SAFETY
i'/{\CONG DIST. 5
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSEP/:ill.Wfs: 0 MANAGER: BURT RIDDLE
.,.,,,;:;::FUND SOURCE: DEMONSTRATION PROGRAM
NOT APPLICABLE
FEDERAL HIGHWAYADMIN FUNDS
...;-:,:,:,:,:::::::-:
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0 1000
800 200
FULTON 770396
STATUS:
ATMS MODIFICATIONS TO FIVE TRANSPORTATION MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED MANAGER: BURT RIDDLE REQ DEKALB/FULTON/COBB/GWINNETT ATMS l/94;CLAYTON
& 3 FUND'l8Jk8~; DEMONSTRAT.t6JfJ!bi't&.M
FEDtm HIGHWAY JiliMrn'hiNDs
PE NONE
$
ROW NONE
$
CONST 1995
$
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0
5000 4000 1000
FULTON 770397
STATUS:
ATMS NON-FREEWAY FIELD COMMUNICATIONS FIBER OPTIC CABLE MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE OTO WILL NOTIFY
,:;:::g[:G DIST. 6 &
;gJ;:; souRcl{Jg:JJ;NSTRATION
FEDERAL rtfcfawb
PE NONE
$
ROW NONE
$
.CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0
9500 7600 1900
FULTON 770398
STATUS:
ATMS NON-FREEWAY ADVANCED TRAVELER INFORMATION SYSTEM
MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE OTO WILL NOTIFY
CONG DIST. \5 & 11
FUND SOURCE: DEMo~itfutfroN PROGRAM
FEDERAL HIGHWAY Ai::iMrN FUNDs
PE NONE
$
ROW NONE
$
CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0
2000 1600
400
COUNTY P.I.NO..
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-.L!l!/4 Page 34
FISCAL YEAR
COST ESTS
FULTON 770401
STATUS:
COMPUTER HWDWARE/SOFTWARE-ATL REGIONAL '.r,1U\NS MANAGEMENT SYS
:~~~~ ,I~:!~iy: 00 - EXIST. LANES: 0 /fr.BQPOSEO LANES: 0 1
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE
ATLANTA TIP i R 98
PE NONE $
0
CONG DIST. 5
ROW NONE $
0
CONST 1995
$
155
FUNQ SOURCE: DEMONSTRATION PROGRAM
FED SHARE.$
124
FEDERAL HIGHWAY AOMIN FUNDS
GA. SHARE$
31
0TH SHARE$
FULTON 770403
STATUS:
SURVEILLANCE SYSTEM I-75 FM I-85}rO'N!SIOE & I-B~Jfo BUFORD
MISCELLANEOUS IMPROVEMENTS / s,tlE't:ff@:
-:::::,
PROJECT MILEAGE : 11. 00 - EXIS'Ji('LANES: 0 /PROPOSEJ/~ES: 0
MANAGER: BURT RIDDLE
LGPA NOT APPLICABLE
CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE NONE
$
ROW NONE $
CONST 1995
$
FED SHARE $
GA. SHARE $
. 0TH SHARE $
0 0 2000 1600 400
FULTON 770404
STATUS:
ATL TRANS MGMT sys -Mhl:tRh'iME:NT CENTER & CONTROL cotii'.~wARE
:~~~c/~~i~;:. ~ ~~E=YlksT. LANES: 0 /PROPosia::1mi~: 0
MANAGER: BURT RIDDLE NOT APPLICABLE
CONG DIST. 5
FUND SOURCE: .OEMONSTRATIONPROGRAM FEDERAL HIGHWAY AOMIN FUNDS
PE NONE
$
ROW NONE
$
CONST 1995 $
FED SHARE $
GA. SHARE $.
0TH SHARE $.
0 0 4000 3200 BOO
FULTON 770405
STATUS:
FULTON 770406
STATUS:
ATL TRANS MGMT sys -UPGRADE CITY ATL TRAFFIC oPERATrdJkj~~~~:
PE NONE
$
MISCELLANEOUS IMPROVEMENTS/ SAFETY
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSEO: LANES: 0
ROW NONE
$
CONST 1995
$
MANAGER: BURT RIDDLE
PROGRAM
FED SHARE,$
FORCE ACCOUNT AGREEMENT WITH ATLANTA
ADMIN FUNDS
.GA. SHARE$
ADVANCED TRAVELER INFO SYS-VARIA MSG SGNS, HWY ADVISE MISCELLANEOUS IMPROVEMENTS/ SAFETY
0::: DIST,, , 10
0TH SHARE$
PE NONE
$
ROW NONE
$
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES;{ ::o::,;::::::: ,..
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE
ii:iaRAM FUND :)i'tjtAfc'E: OEMONSTRATfot
CONST 1995 $ FED SHARE.$
FEot~t:ihGHWAY AriMrn,tilitos
GA. SHARE$
0TH SHARE$
0 0 250 200 50
0 0 5500 4400 1100
FULTON 770407
STATUS:
RAMP METERING AT VARIOUS RAMPS ONTO I-75, I-85 & I-20 RAMP / SAFETY . PROJECT MILEAGE : .. 00 - EXIST. LANES: O /PROPOSED LANES: 0
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE
FULTON 770408
STATUS:
INSTALL COMMUNICATIONS LINKS BETWEEN TMC ANO TCC'S MISCELLANEOUS IMPROVEMENTS./ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE
:41 / . \ 6NG DIST. 5_./t;
:g:: . R~:
~
0 0
;kJJ~'. FUND souRci(i:;fi:.ioNSTRATION
~ 9
750
toNs~E~ !~ARE . 600
FEDERAL.HiGHWAY AOMIN FUNDS .. . .
GA. SHARE $
150
0TH SHARE$
~ CONG 0:::\,,,5 & 1
FUND. SOURCE: DEMotit';~f;ON PROGRAM
FEDERAL HIGHWAY J)MIN FUNDS
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $.
GA. SHARE$ 0TH SHARE$
0
0
3000 2400
600
=
c:;::;;::::;;,
c:
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 35
FISCAL YEAR
COST ESTS
FULTON 770410
STATUS:
ATMS ADVANCED VEHICLE IDENTIFICATION MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE: .00 - EXIST. LANES: MANAGER: BURT RIDDLE LGPA NOT APPLICABLE
LANES: 0
ATLANTA TIP i R 174
CONG DIST. 6 & 4
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $
ROW NONE
$
CONST 1995 $
FED SHARE$
GA. SHARE$
0TH SHARE$
0
0
1800 1440
360
FULTON 770450
STATUS:
HISTORIC DEPOT RENOVATION IN MISCELLANEOUS IMPROVEMENTS/ PROJECT MILEAGE : .00 MANAGER: UNKNOWN TO BE DONE BY CONTRACT
ATLANTA TIP i FS 64
CONG DIST. 5
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996 $ 188
FED SHARE$
150
GA. SHARE$
0TH SHARE$
38
FULTON 770490
STATUS:
TRAIL SYSTEM IN BICYCLE/PED. FACILITY PROJECT MILEAGE : .00 MANAGER: STEVE YOST TO BE DONE BY CONTRACT
ATLANTA TIP i FN 80
CONG DIST. 6
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1996
$
711
FED SHARE$
569
GA. SHARE$
0TH SHARE s 142
FULTON 770510
STATUS:
BICYCLE/PEDESTRIAN/LANDSCAPING IN ALPHARETTA BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: UNKNOWN TO BE DONE BY CONTRACT
SOURCE: TRANS. ENHANCE. HIGHWAY ADMIN FUNDS
PE LOCL ROW LOCL
CONST 1996 $ FED SHARE $ GA. SHARE $ 0TH SHARE $
1250
rooo
250
FULTON 770520
STATUS:
FROM FREEDOM PARKWAY TO BICYCLE/PED. FACILITY/ PROJECT MILEAGE : .00 -
MANAGER: STEVE YOST TO BE DONE BY CONTRACT
PE LOCL
ROW LOCL
CONST 1995 $ 300
FED SHARE $ 240
GA. SHARE $
'0TH SHARE $
60
FULTON 770540
STATUS:
CAPITOL AVE PEDESTRIAN CORRIDOR FM STADIUM TO GA STATE MARTA BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE : .90 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. CRANFORD TO BE DONE BY CONTRACT
FULTON 770545
STATUS:
PEDESTRIAN BRIDGE/CORRIDOR FM DOME/WCC TO FIVE POINTS BRIDGES/ ENHANCEMENT. PROJECT MILEAGE: .00 MANAGER: STEVE YOST TO BE DONE BY CONTRACT
FtiNo sou~9tJIiiliis. ENHANCE.
FEDERAL.:Hl'.i:;liWAY ADMIN
u,;_,i/:,///:::'i::"
PE LOCL ROW LOCL
1995 $ FED SHARE $ GA. SHARE $ 0TH SHARE $
5000 4000
1000
ATLAN:~:::~[ i CONG DIST. -::5
FUND SOURCE: FEDERAL HIGHWAY
PE LOCL ROW LOCL CONST 1995 $
FED SHARE $ GA. SHARE $ 0TH SHARE $
2200 1760
440
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 770550
STATUS:
INTERNATIONAL BLVD PEDESTRIAN CORRIDOR BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .85 - EXIST. LANES: 0 MANAGER: D. CRANDORD TO BE DONE BY CONTRACT
PIEDMONT AV
ATLANTA TIP t R 145 CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE; FEDERAL HIGHWAY ADMIN FUNDS
FULTON 770555
STATUS:
ATLANTA UNIVERSITY PROMENADE PRELIMINARY ENGINEERING/ PROJECT MILEAGE : .00 MANAGER: D. CRANFORD TO BE DONE BY CONTRACT
ATLANTA TIP t R 148 CONG DIST. 5 0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 36
FISCAL YEAR
COST ESTS
PE LOCL
ROW LOCL
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
4000 3200
800
PE 1995
$
500
ROW NONE
$
0
CONST NONE
$
0
FULTON ADDITIONAL INCIDENT__,:,~,i,J';J''~-~
770595 .. MISCELLANEOUS
"
PROJECT MILEAGE : .00 -
0
MANAGER: BURT RIDDLE
STATUS: NOT APPLICABLE
FULTON 770597
STATUS:
BICYCLE FACILITIES AT COMMUTER AND HIGH DENSITY
:!;~~~/:~~EA~:C;L~~~ ~~~~~~-LANES: 0 /PROPOSE~:~f~i 0 MANAGER: LUKE COUSINS NOT APPLICABLE
FULTON 770605
STATUS:
TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN FULTON c;ifNTY
~i SIGNALS/ SAFETY
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES
MANAGER: BURT RIDDLE
""
REQ FULTON DO ROW, UTIL, PE & 20% CONSTRUCTION 7-15-93\:}i
FULTON 770610
STATUS:
TRAFFIC DETECTION ENHANCEMENT MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE NOT APPLICABLE
FULTON 770631
STATUS:
REGIONAL RIDESHARE PROGRAM RIDE SHARING/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE CCUSINS
NOT APPLICABLE
ATLANTA TIP tR 173 CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW NONE
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 1000
BOO 200
\ATLANTA TIP t R 177 :QONG DIST. 5
FUND SOURCE: CONG MIT. /AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
:?\:;\:\:- .
PE LOCL
ROW NONE
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
-0 500 -400
100
>t;~~~~sl~~:~ &F:86/Fs48
ati F~;;:,1aijiEi: CONG:_MIT ./Kit
FEDE:MliiliIGHWAY ADMINFUNDS ,::::
PE 1994
$
50
ROW NONE
$
0
CONST 1995
$
460
FED _SHAR.E $
368
GA. SHARE $
0TH SHARE $
92
.,
FUND SOUR<;:${'66i4G MIT. /AIR l,lU.tU.,,,,_,,.,,,:,,/
FEDE:RAL 11:tq,fii'.?AY ADMIN
PE NONE
$
ROW NONE
$
1995
$
FED SHARE $
GA; SHARE $
0TH SHARE $
!:[p ATLANT:
t R 159
CONG DIST. C:5 & 4
FUND SOURCE: FEDERAL HIGHWAY
PE NONE
$
ROW ~ONE
$
CONST 1996
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 2000 1600 40_0
0
0
3000 2400
600
r.
~
.
r.
GEORGIA DEPARTMENT OF TRANSPORTATION
22-Feb-1994
DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
Page 37
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COUNTY
DESCRIPTION
FISCAL
COST
P.I.NO.
PROJECT DATA
COMMENTS
YEAR
ESTS
---------------
FULTON MARTA
D.E-M-A-N-D--R-E-S-P-O-N-S-I-V-E--M--IN-I---B-U-S-E-S---(2-)----------Y-E-A-R---------------A-T-L-A-N-T-A--T-I-P--t--M---R--1-6-1-------------------P-E--N-O-N-E------$------
0
770633 MISCELLANEOUS IMPROVEMENTS/ OTHER
CONG DIST. 5 & 4
ROW NONE $
0
PROJECT MILEAGE : . 00 - EXIST. LANES: 0
0
CONST 1996
$
362
MANAGER: LUKE COUSINS
FUND SOURCE: CONG MIT./AIR QUAL
FED SHARE$
290
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
GA. SHARE$
0TH SHARE$
72
FULTON 770636
STATUS:
MARTA BUS PRIORITY CONTROL MISCELLANEOUS IMPROVEMENTS PROJECT MILEAGE : .00 MANAGER: LUKE COUSINS NOT APPLICABLE
ATLANTA TIP t M-R 164
CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
PE 1995 $
30
ROW NONE $
0
CONST 1996
$
500
FED SHARE$
400
GA. SHARE$
0TH SHARE$
100
FULTON 770637
STATUS:
SIDEWALKS AT RAIL SIDEWALKS/ OTHER PROJECT MILEAGE : .00 MANAGER: LUKE COUSINS SEND LGPA IN 1995
ATLANTA TIP i R 165
CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
FULTON 770638
=r~~~T;:::o~~~~~T:~s FOR RIGR CONGEsil~ tad'" wi~"!"i~s~:Sf&R,'"
PROJECT MILEAGE : .. 00 - EXIST. LANES: 0 /PROPOSEp: :Llill1t'S: 0
MANAGER: LUKE COUSINS
FUND SOURCE: CONG MIT./AIR QUAL
STATUS: NOT APPLICABLE
FEDERAL HIGHWAY ADMIN FUNDS
PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0 0
6000 4800
1200
PE LOCL ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE $ 0TH SHARE$
0
3000 2400
600
FULTON 770660
STATUS:
MARTA ADA PARATRANSIT/RAIL STATION MODIFICATIONl;c PHASE 2 . TRANSIT PROJECTS/ CAPITAL PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED
MANAGER: NOT APPLICABLE
FUNi:Mfoidf: SURFACE TRlffiJidJ!fi
FER,E~/HIGHWAY ADMIN .tUNPS
7 TJ6"60XIS AN ASSOCiATEP _PROJECT. :}
PE NONE $ ROW NONE. $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$
0
0
2180 1744
436
FULTON 770680
STATUS:
SURVEILLANCE SYSTEM FOR THE ATLANTA INTERSTATES MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE
,/. /b)NG DIST. 5
;JJb souRdi}I2!t: MIT./AIR
FEbERALHfoHWAY ADMIN
PE NONE $ ROW NONE $
1995 $
FED SHARE $ GA. SHARE $ 0TH SHARE $
0 .0 6000
4800 1200
FULTON .770690
STATUS:
SURVEILLANCE SYSTEM FOR THE ATLANTA ARTERIAL SYSTEM MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE
CONG DIST.
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $ GA. SHARE $
0TH SHARE $
0 0 5000 4000 1000
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
FULTON 770740
STATUS:
PURCHASE 10 CLEAN ENGINE MARTA BUSES VEHICLE PURCHASES/ CAPITAL PROJECT MILEAGE: .00 EXIST. LANES: MANAGER: UNKNOWN NOT APPLICABLE,
CONG DIST. 5 & 11
0
FUND soURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
FULTON 770741
STATUS:
MARTA ;_;;;:PRESS BUS ROUTE FOR MISCELLANEOUS IMPROVEMENTS/ PROJECT MILEAGE : ;OO MANAGER: UNKNOWN NOT APPLICABLE
CONG DIST. 5 & 4
0
FUND SOURCE: CONG,MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
FULTON 770742
STATUS:
MARTA EXPRESS BUS MISCELLANEOUS IMP~OVEMEN'TS
PROJECT MILEAGE: MANAGER: UNKNOWN NOT APPLICABLE
CONG DIST. 5 & 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
FULTON 770330
STATUS:
OLYMPICS TRANSPORTATION PLANNING - 1995
!:~~iN~iE!~iI~E~~~N: 'xi~Ni~Es: o /PROPOsEp:ffi&j'f o MANAGER: LGPA NOT APPLICABLE
,.,,.,,A.,TLANTA TIP i R 149 {}\QONG DIST. 5
''')/;UNO SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS .
22-Feb-1994 Page 38
FISCAL YEAR
COST ESTS
PE NONE $
ROW NONE $
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 0 2366 1893
473
PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $ GA. SHARE $
0TH SHARE $
0 0 1546 1237
309
PE NONE $ ROW NONE $
CONST -1996 $ FED .SHARE$
GA. SHARE$ 0TH SHARE$
0 0
3554 2843
711
PE 1995
$
250
ROW NONE $
0
CONST NONE $
0
FULTON 77W330
STATUS:
OLYMPICS TRANSPORTATION PLANNING - 1996 FUNDING:,:.
PRELIMINARY ENGINEERING PROJECT MILEAGE : .00
/ PLANNING EXIST. LANES:
0
/PROPOSED
LANES,(O''
MANAGER:
LGPA NOT APPLICABLE
,..,,,:,:::::: ~::ANTA '.t~~[t R 149
,: :/CONG DI~fi??
FUND :sotradi: SURFACE Truu1sdtH< ifi:GHWAY AOMIN:idNos
PE 1996
$
250
ROW NONE
$
0
CONST NONE $
0
FULTON 7D7015
STATUS:
NORTH LINE EXTENSION - MEDICAL CENTER TO NORTH SPRINGS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE
FULTON 7D7016
STATUS:
FIXED GUIDEWAY MODERNIZATION PROGRAM TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE-KISH LGPA NOT APPLICABLE
1995
$
FED SHARE$
GA. _SHARE $
0TH SHARE$
64264 51411
12853
:!ii!) CONGDIST.5&4
CAPITAL.l 995
$
FUND SOURCE: URBlill.TRANSIT DISC.
FEDERAL TRANSIT JffiMIN FUNDS
FED SHARE$ GA. SHARE$
0TH SHARE$
8494 6795
1699
,:
==
~
1
0
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
FULTON 7D7017
STATUS:
PROCUREMENT OF 80 BUSES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 39
FISCAL YEAR
COST ESTS
CONG DIST. 5 & 4
CAPITAL 1995
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
17600 14080
3520
FULTON 7D7019
STATUS:
NORTH LINE EXTENSION - MEDICAL TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 5 & 4
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
22564 18051
4513
FULTON 7D7101
STATUS:
FIXED GUIDEWAY TRANSIT PROJECTS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 5 & 4
CAPITAL 1996
$
FUND SOURCE: URBAN TRANSIT DISC.
FED SHARE $
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
0TH SHARE $
8494 6795
1699
FULTON 7D7143
STATUS:
PUBLIC TRANSIT SERVICE FOR FULTON
TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE
DIST. 5 & 4
SOURCE: URBAN TRANSIT TRANSIT ADMIN FUNDS
OPERATING 1995 $ FED SHARE $ GA. SHARE $ 0TH SHARE $
10344 5172
5172
FULTON 7D7154
STATUS:
LINE REHAB. /RENOV., RAIL CAR OVERHALL, TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE
CAP.
URBAN
TRANsif:
}
.... CAPITAL
1995
$
FED SHARE$
ADMIN ':Ftii4b
GA. SHARE$
0TH SHARE$
29976 23981
5995
FULTON 7D7165
STATUS:
PUBLIC TRANSIT SERVICE FOR FULTON AND DEKALB COUNTIES TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE
i\4):,
SOURcil:F &kaAN TRANSIT
FEDERAL TRANSIT ADMIN
1996 $ FED SHARE$ GA. SHARE$ 0TH SHARE$
10344 5172
5172
FULTON 7D7176
STATUS:
RAIL CAR OVERHAUL, BUS PURCHASES, TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE
CAP.
MAINT.,
ETC.
CONG DIST.
FUND SOURCE: FEDERAL TRANSIT
CAPITAL 1996
$
FED SHARE$
GA. SHARE$
0TH SHARE$
29976 23981
5995
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
FULTON 7D7502
STATUS:
REGIONAL, FINANCIAL AND SHORT SPECIAL STUDIES/ PLANNING FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 5
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 40
FISCAL YEAR
COST ESTS
PLANNING 1995
-$
FED SHARE $.
GA. SHARE$
0TH SHARE$
1600 1280
320
FULTON 7D7503
STATUS:
REGIONAL, FINANCIAL AND SHORT SPECIAL STUDIES/ PLANNING FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH
CONG DIST. 5
FUNDSOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS
PLANNING 1996 $ FED SHARE $ GA. SHARE $
0TH SHARE $
1600 1280
320
FULTON 7V1026
STATUS:
ELDERLY AND DISABLED TRANSIT PROJECTS/ FUNDS RECIPIENT: MANAGER: STEVE KISH'
CONG DIST. 5
CAPITAL 1995
$ 131
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
105
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
13
0TH SHARE $
13
FULTON 7V1027
STATUS:
ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY MANAGER: STEVE KISH
DIST. 5
CAPITAL i996.
$ 136
SOURCE:'ELDERLY & DISABLED FUND
FED SHARE $
109
TRANSIT ADMIN FUNDS
GA. SHARE $
13
0TH SHARE $
14
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
GWINNETT HOV LUMP SUM SIGNING ON I-75 & 71297X HOV LANES/ SAFETY
PROJECT MILEAGE : .00 - EXIST. MANAGER: BURT RIDDLE STATUS:
SEE CLAYTON
ATLANTA TIP i R 73
CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712970 IS AN ASSOCIATED PROJECT.
GWINNETT SR 124 FM ROCKBRIDGE RD/DEKALB 72153X RECONSTRUCTION & WIDENING
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS:
ATLANTA TIP i GW 76
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 721530 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 41
FISCAL YEAR
COST ESTS
PE 1993 UNDERWAY
ROW NONE
$
0
CONST 1995
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
PE 1992 ROW 1997 CONST
UNDERWAY
$
0
AFTER 97
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
HENRY 72148X
STATUS:
SR 138 FM WALT STEPHENS RD/CLAYTON TO RECONSTRUCTION & WIDENING. NO LANE PROJECT MILEAGE : .00 MANAGER: J. GARLAND
co
ATLANTA TIP# CL 31
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS 721480 IS AN ASSOCIATED PROJECT.
HENRY 73092X
STATUS:
PANOLA RD FM STAGECOACH RD RECONSTRUCTION & WIDENING PROJECT MILEAGE : .00 MANAGER: UNKNOWN
ATLANTA TIP# CL16/HE4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 730920 IS AN ASSOCIATED PROJECT.
22--Feb-1994 Page 42
FISCAL YEAR
COST ESTS
PE 1992 ROW 1996 CONST
UNDERWAY
$
0
AFTER 97
PE ROW LOCL CONST
$
0
AFTER 97
"
r
=.,
cz=:,
~
COUNTY P.I.NO,
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ROCKDALE SALEM RD FM FLAT SHOALS TO N/RR[INCL BR\@ I-20;RECST INTCH]
712090 RECONSTRUCTION & WIDENING FROM 2 LANES T,. 6 LANES.
PROJECT MILEAGE : . 60
...
MANAGER: BILL MOSKAL
STATUS: SIGNED BY COUNTY 5-28-85 FOR
ATLANTA TIP i R 1
CONG DIST. 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71Y090 IS AN ASSOCIATED PROJECT.
22-Feb-1994 Page 43
FISCAL YEAR
COST ESTS
PE 1986
UNDERWAY
ROW 1991
UNDERWAY
CONST 1995
$ 9352
FED SHARE $ 8417
GA. SHARE $
935
0TH SHARE $
ROCKDALE I-20/CONYERS@ WEST AVE 712240 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : . 00 - EXIS'l'i
3 /PROPOSED iJJfas: 5
STATUS: ~!~~R~YB~~~YMg;~NYERSi,if~f~J FOR UTILITIES
i .JI~ ROCKDALE PMl<ER RD FM CULPEP~~I ~ D @ MALCOLM INCL
120
712640 RECONSTRUCTION & WIDENING /FROM 2 LANES TO 4 LANESif:?'/c"'"'
PROJECT MILEAGE : . 72 MANAGER: BILL MOSKAL
:) \
' (i .
STATUS: CT REQ CO ROW, UTIL & PE 4-5'"9.~f CITY SGN
ATLANTA TIP i R 19
CONG DIST. 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP i RO 15
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 71Y640 IS AN ASSOCIATED PROJECT.
PE 1986
UNDERWAY
ROW 1993
UNDERWAY
CONST 1995
$ 2423
FED SHARE $ 2181
GA. SHARE $
242
0TH SHARE $
PE LOCL
ROW LOCL
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
4663 3730
933
ROCKDALE PARKER RD FM CULPEPPER TO OAKLAND@ MALCOLM/BR 71Y640 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE: .00 MANAGER: BILL MOSKAL STATUS:
ROCKDALE SR 138 FM RELOC SR138@ SR 20 TO I-20 721580 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES,
PROJECT MILEAGE : 1.26
STATUS: ~A~~~~T~D;Hg~i~ 2-4-91; CONYERS sGN PUBLIC UTIL 2;1,i/li'.J
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
)7f2640\ts ,,,....-:.
-::-:. AN ASSOCIATED PROJECT.
:;:.~~~~~s}~~~i RO 35
;;;bM66k8k; SURFACE TRANSPbiFi!'.<.
FEDERAL :HIGHWAY ADMIN ..... .
PE LOCL
ROW NONE
$
CONST 1995
$
FED SHARE $
GA. SHARE $
0TH SHARE $
0 1979 1583
396
PE 1993 ROW 1995 CONST
UNDERWAY $ 2390 AFTER 97
ROCKDALE SR 20@ BIG HAYNES CREEK NEAR WALTON CO LINE 730950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: D. GODWIN STATUS: ROCKDALE SIGNED 10-27-92 FOR UTILITIES.
, i'X~TA TIP i J,ltf 42? /c;c:>NG DIST. 4 ... FBNo SOURcit:Mn:DGE PROGRAM FEDERAL RIGHWAY ADMIN FUNDS/
PE 1995 ROW 1997 ?})CONST
$
52
$
10
AFTER 97
ROCKDALE SR 138 FROM SIGMAN RD/SR 20 TO DENNARD RD 731040 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.75 MANAGER: D. CHURCH STATUS: COUNTY SGN 3-1-91 UTILITIES; REV REQ CITY DO UTIL 1-24-94
f h ATLANTA
i RO 13
CONG DIST. :.4
FUND SOURCE: NAT'!.:~:fdk:~y
FEDERAL HIGHWAY Af>M'IN. FUNDS
731045 IS AN ASSOC::!A1ED PROJECT.
PE 1993 UNDERWAY
ROW 1994
UNDERWAY
CONST 1995
$ 7628
FED SHARE $ 6102
GA. SHARE $ 1526
0TH SHARE $
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ROCKDALE SR 138@ YELLOW RIVER
731045 REHAB. OF THE EXISTING BRIDGE(S). FROM f)!:LANEs TO 5 LANES. PROJECT MILEAGE: .00 MANAGER: D. CHURCH
STATUS: ROCKDALE SGN 3-1-93 FOR UTILITIES.
ATLANTA TIP i RO 46
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 731040 IS AN ASSOCIATED PROJECT.
ROCKDALE SR 138/SR 20 FROM NORTH OF I-20/j/6::;~~
731047 RECONSTRUCTION & WIDENING FROMi/4 :i,i:;iil:s TO
iat STATUS: 2;;;ti:Eii~~i~:/:/92f!@S
UTIL/REFUSED ROW ,~[193
ATLANTA TIP i RO 13
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 44
FISCAL YEAR
COST ESTS
PE 1993
UNDERWAY
ROW NONE
$
0
CONST 1995
$
788
FED SHARE $
630
GA. SHARE $
158
0TH SHARE $
PE NONE ROW 1996 CONST
$
0
$ 5789
AFTER 97
ROCKDALE OLD COVINGTON HWY @ ROti~fi)ti,E INDUST. BLVD & FARMER/iw
742510 INTERSECTION IMPROVEMENT)JsAFETY
PROJECT MILEAGE : . 00 - EXtST . LANES: 2 /PROPO$!!lBi! Oilifs : 2
~:t~,~~/~8. STATUS:
~g~w!~w & UTIL;iis
.T&S il~I&
ROCKDALE 742810
STATUS:
ROCKDALE STANTON RD/CR 434 FM HONEY CREEK RD TO EBENEZ~:\tto 742820 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.55
MANAGER: BILL MOSKAL STATUS: CONTRACT REQ COUNTY DO DESIGN, ROW AND UTILITIES
ROCKDALE SIGMAN RD FM I-20 NORTH TO SR 20/138 (EAST LEG)
752210 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.
PROJECT MILEAGE : . 2. 50
.
MANAGER: D. CHURCH (M)
STATUS: REQ CONYERS/ROW/UTIL/PE 2/93;ROCKDALE SGN 3-1-93 ROW/UTL/PE
ROCKDALE OLD COVINGTON HWY FM GREEN ST TO SR 138/20 752270 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : 00
MANAGER: D. CHURCH (M) STATUS: SEND LGPA IN 1996
ATLANTA TIP i RO 31
CONG.DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE NONE
$
0
ROW LOCL
CONST 1995
$
205
FED SHARE $
185
GA. SHARE $.
21
0TH SHARE $
FUND SOURCE: HWY.'SAFETY FEDERAL HIGHWAY ADMIN FUNDS
PE LOCL
ROW LOCL
CONST 1995 - $
401
FED SHARE $
361
GA. SHARE $
40
0TH SHARE $
FUND 16Wci = suRFAcE -rRiills~8k-r>
FEptJUili111GHWAY AriMp,1 F.umfa
PE LOCL
ROW LOCL
CONST 1997
f
FED SHARE $,
GA .. SHARE $
0TH SHARE$
2667 2134
986 1519
PE 1996 ROW. LOCL ........:::toNST
FUND SOURcf+ s6RFACE TRANSPORT'.
FEDERALliiGkWAY ADMIN FUNDS)
;t~: ~=: I .::,1~:~:,v. PE 1995 ROW LOCL CONST
FEDERAL HIGHWAY ADMik FUNDS
$
20
AFTER 97
$
10
AFTER 97
.
~
~
!..!.,.,,.!-~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ROCKDALE FLAT SHOALS ROAD@ OLD SALEM ROAD
752280 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .43 - EXIST. LANES: 2 /?~<>POSED LANES: 5
MANAGER: D. GODWIN (C)
.J:J \
STATUS: COUNTY SIGNED CONTRACT FOR ROW, UTILI'J;:(tffi,f ~.E:,1-11-94
RPtfi,l;:: ROCKDALE EBENEZER RD/CR .,. FM STANTON
9
.:2~,/CR 438
752330 RECONSTRUCTION & WIDENING FROM 'i:(LANES TO 4 LANES ....
D~~i~~j STATUS: ~~;;M~~t:~gi#::
ig; & UTILITIES 2-9-~~t\
ATLANTA TIP f RO 25
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f RTP-RO 24
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. ~EDERAL HIGHWAY ADMIN FUNDS
ROCKDALE 752350
STATUS:
ATLANTA TIP f RO 24
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FONDS
ROCKDALE KLONDIKE RD/CR 437 FM SMYRNA RD/CR 438 TO JOHNSON SPOJ[J }: !::{,::\ATLANTA TIP f RO 17
7 52390 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.
~E!~~:~i~t:~~~~~ STATUS:
OTIL & ALL CST OVER'HMi:~~~I i~6-94
.CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FONDS
:::::i:!:iii\::..
ROCKDALE HORST ROAD AT HONEY CREEK 752400 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: D. GODWIN (C) STATUS: REQ ROCKDALE DO ROW/UTIL/PE & PAY ROW OVER $293,000
ROCKDALE SMYRNA RD/CR 438@ KLONDIKE RD/CR 57 752410 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .20 - EXIST. LANES: 0 /PROPOSED. LANES: 0 MANAGER: D. GODWIN STATUS: REQ COUNTY DO ROW, UTIL, PE & ALL CONST OVER $90,000 10-5-93
< ~~~~~s;:l:~lt RO 49
FO;;~V:1: BRIDGE 0:':JttGHWAY
if W'i~iit.i'.p,~,5l\if JI!'
FUND SOUR#(#~- SAFETY
FEDERAL HIGHWAY ADMIN
ROCKDALE ROCKBRIDGE RD/CR 74@ MAIN ST IN CONYERS 752420 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .38 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN STATUS: REQ COUNTY DO ROW, UTIL, PE & CONST OVER $225,000 10-5-93
ATLANTA TIP f RO
CONG DIST .-c::4 .
FOND SOURCE: HWY FEDERAL HIGHWAY
22-Feb-1994 Page 45
FISCAL YEAR
COST ESTS
PE LOCL
ROW LOCL
CONST 1995
$
506
FED SHARE $
455
GA. SHARE $
51
0TH SHARE $
PE LOCL ROW LOCL CONST 1997 $
FED SHARE $ GA. SHARE $ 0TH SHARE $
1835 1468
581 948
PE LOCL
ROW LOCL
CONST 1995
$
205
FED SHARE $
185
GA. SHARE $
95
0TH SHARE $
115
PE LOCL
ROW LOCL
CONST 1997
$
FED SHARE $
GA. SHARE $
0TH SHARE $
1977 1582
802 1197
PE LOCL
ROW LOCL
CONST 1997
$
557
FED SHARE$
446
GA. SHARE$
153
0TH SHARE$
264
PE LOCL
ROW LOCL
1995 $ 215
FED SHARE$
194
GA. SHARE$
104
0TH SHARE$
125
PE LOCL
ROW LOCL
CONST 1996
$
408
FED SHARE$
367
GA. SHARE$ 142
0TH SHARE$
183
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1Q95/FY 1997
COMMENTS
ROCKDALE FARMER RO/CR 439@ SIGMAN RD/CR 435 752440 INTERSECTION IMPROVEMENT/ SAFETY
PROJECTMILEAGE: .20 - EXIST. LANES: MANAGER: 0. GODWIN STATUS: REQ COUNTY DO ROW, UTIL, PE & CONST
10-5-93
ATLANTA TIP# RO 30 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
22-Feb-l~i''' Page 46
FISCAL YEAR
COST ESTS
PE LOCL
ROW LOCL
CONST 1995
$
392
FED SHARE $
353
GA. SHARE $
173
0TH SHARE $
212
ROCKDALE SR 212 AT TUCKER MILL ROAD 752490 TURN LANES/ SAFETY
PROJECT MILEAGE : 7.00MANAGER: D. GODWIN STATUS: CONTACT TRAFFIC
ATLANTA TIP# R 40
CONG DIST. 4 0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS
PE 1994
UNDERWAY
ROW 1995
$
10
CONST 1996
$
231
FED SHARE $
208.
GA. SHARE $
23
0TH SHARE $
ROCKDALE ELDERLY AND 7Vl035 TRANSIT PROJECTS/
FUNDS RECIPIENT:. AGENCIES
MANAGER: STEVE KISH
STATUS:
CONG DIST. 4 .
CAPITAL 1995
$
10
FUND.SOURCE: ELDERLY & DISABLED FUND
FED SHARE$
8
FEDERAL TRANSIT AOMIN FUNDS
GA. SHARE$-
1
0TH SHARE $
1
ROCKDALE ELDERLY AND DISABLED VEHICLES ANO EQUIPMENT 7V1036 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN ROCKDALE MANAGER: STEVE KISH STATUS:
DIST. -4
CAPITAL 1996
$
10
FUND
FED SHARE:$
8
AOMIN FUNDS
GA. SHARE$
1
0TH SHARE$
1
. , \
,.
..,
~
~ 0
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ALL 811010
STATUS:
STUDY OF AUTOMATIC MOTOR-CARRIER SPECIAL STUDIES/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: UNKNOWN LGPA NOT APPLICABLE
(ADVANTAGE I-75)
CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 1
FISCAL YEAR
COST ESTS
PE 1995 ROW NONE CONST NONE
$ 2200
$
0
$
0
ALL 811020
STATUS:
RURAL !VHS I-85, I-16, I-95, MISCELLANEOUS IMPROVEMENTS/ PROJECT MILEAGE : .00 MANAGER: BURT RIDDLE LGPA NOT APPLICABLE
ALL 870010
STATUS:
TRANSPORTATION SPECIAL STUDIES PROJECT MILEAGE MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
0
FUND SOURCE: I-STATE MAINT. ~EDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 99 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS
PE 1994
UNDERWAY
ROW NONE
$
0
CONST 1995
$ 2310
FED SHARE $ 2310
GA. SHARE $
0TH SHARE $
PE 1995 ROW NONE CONST NONE
$ 3000
$
0
$
0
ALL 870020
STATUS:
TRANSPORTATION PLANNING AND MANAGEMENT SYSTEMS
SPECIAL STUDIES/ PLANNING
.
PROJECT MILEAGE : .00 - EXIST. LANES: 0
MANAGER:
LGPA NOT APPLICABLE
FUND SOURCE: UNKNOWN F,.E..D.E-R--A. -L. HIGHWAY ADMIN FUNDS
ALL 870021
STATUS:
TRANSPORTATION PLANNING AND MANAGEMENT SYSTEMS
6m:t \ SPECIAL STUDIES/ PLANNING
PROJECT MILEAGE : .00 - EXIST.
LANES:
0 /PROPOSED LANES:
\CQ~G DISff ~9
MANAGER:
FU;i:1gJMf: UNKNOWN
LGPA NOT APPLICABLE
F~,R~m}HIGHWAY ADMIN
PE 1996 ROW NONE CONST NONE
$ 3000
$
0
$
0
PE ROW NONE CONST NONE
$ 3000
$
0
$
0
ALL 8Vl011
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH LGPA NOT APPLICABLE
ALL 8Vl012
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH LGPA NOT APPLICABLE
CAP.ITAL 1995
$ 297
idl-io SOURcif':ELDERLY & DISABLED itiND FED SHARE $ 238
FEDERAL. TRANSIT ADM IN FUNDS . /'''''"
GA. SHARE $
29
0TH SHARE$
30
CAPITAL 1996
$
FUND FED SHARE$
GA. SHARE$
0TH SHARE$
308 246
31'
31
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
22-Feb-1994 Page 2
FISCAL YEAR
COST ESTS
ALL 8Vl014
STATUS:
ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 53 RURAL COUNTIES MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 99
CAPITAL 1995
$
187
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
150
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
18
0TH SHARE $
19
ALL 8Vl017
STATUS:
ELDERLY AND DISABLED TRANSIT PROJECTS/ FUNDS RECIPIENT: 45 MANAGER: STEVE KISH LGPA NOT APPLICABLE
ALL 8Vl018
STATUS:
ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH LGPA NOT APPLICABLE
CONG DIST. 99
CAPITAL 1996
$
194
FUND SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
155
FEDERAL TR?,NSIT ADMIN FUNDS
GA. SHARE $
20
0TH SHARE $
19
CONG DIST. 99
CAPITAL 1995
$ 212
FUND' SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
170
FEDERAL TRANSIT ADMIN FUNDS
GA. SHARE $
21
0TH SHARE $
21
DIST. 99 .
CAPITAL 1996
$ 220
SOURCE: ELDERLY & DISABLED FUND
FED SHARE $
176
TRANSIT ADMIN FUNDS
GA. SHARE $
22
0TH SHARE $
22
,.
..~
~
"'
C.Ji .. .1..tc.U~
~
! .
COUNTY P. I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
BIBB 811030
STATUS:
CALL BOXES ON I-16 FROM SR 87/BIBB TO MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: BURT RIDDLE NOT APPLICABLE
CONG DIST. 1 & 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 3
FISCAL YEAR
COST ESTS
PE
$
ROW NONE $
CONST 1997 $
FED SHARE$
GA. SHARE$
0TH SHARE$
50
0
1660 14 94
166
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CHATHAM 81103X
STATUS:
CALL BOXES ON I-16 FROM SR 87/BIBB TO UNKNOWN / UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: MANAGER:
.. SEE BIBB
CONG DIST. 1 & 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 4
FISCAL YEAR
COST ESTS
PE
$
0
ROW NONE $
0
CONST 1997 $
0
FED SHARE$
GA. SHARE$
0TH SHARE$
~
....
t,.J.~i,.,o,,, ...;4
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
LAURENS 81103Z
STATUS:
CALL BOXES ON I-16 FROM SR 87/BIBB TO UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER:
CONG DIST. 1 & 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 5
FISCAL YEAR
COST ESTS
PE
$
0
ROW NONE
$
0
CONST 1997
$
0
FED SHARE $
GA. SHARE $
0TH SHARE $
..: ... ,
~
~
COUNTY P.I.NO.
DESCRIPTION PROJECT DATA
GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ALL NPSE95
STATUS:
LUMP SUM NATIONAL PARK SERVICE MISCELLANEOUS IMPROVEMENTS/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: LGPA NOT APPLICABLE
CONG DIST. 99
FUND SOURCE: NAT'L PARK SERVICE FEDERAL HIGHWAY ADMIN FUNDS
ALL NPSS95
STATUS:
LUMP SUM NATIONAL PARK SERVICE
MISCELLANEOUS IMPROVEMENTS/
PROJECT MILEAGE : .oo -
MANAGER: LGPA NOT APPLICABLE
95 CONG DIST. 99
0 FUND SOURCE: NAT'L PARK SERVICE FEDERAL HIGHWAY ADMIN FUNDS
22-Feb-1994 Page 1
FISCAL YEAR
COST ESTS
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
33
FED SHARE $
33
GA. SHARE $
0TH SHARE $
PE NONE
$
0
ROW NONE
$
0
CONST 1995
$
90
FED SHARE $
90
GA. SHARE $
0TH SHARE $