Fiscal Years 1995 1996 1997



INTRODUCTION

The Statewide Transportation Improvement Program (STIP) is

l

developed to comply with the provisions of the Intermodal

Surface Transportation Efficiency Act of 1991 (ISTEA). The STIP

contains Federal Aid projects programmed for Fiscal Years 1995,

i ~

1996 and 1997. The projects have been identified through the planning process and represent transportation needs statewide.

~
t

The STIP includes Highway and Bridge, Bicycle, Pedestrian, Transportation Enhancement, and Public Transportation (transit)

projects. Phases of projects, also referred to as project-

' ~
it-

related activities, such as PE (Preliminary Engineering), ROW (Right of Way) and CONST (Construction) are given for highways, and capital and operating for-transit. The projects are

F .
1

organized by County and by mode of transportation. The STIP format has been standardized with the same information for each

2.

project.

. I
l
~

The STIP is a federal requirement for receipt of Federal Highway Administration and Federal Transit Administration funds. The STIP must be fiscally balanced. Projects and phases of projects

listed may only include those for which there is funding

;,i:.-

available or for which there is a reasonable expectation of

[

obtaining funds. Federal funds for Fiscal Years 1995, 1996 and

1997 are program estimates and will not be final until after the

federal budget is approved by October 1 of each year.

r

The Statewide Transportation Improvement Program places emphasis

on maintaining and improving the existing highways, bridges, and

I

public transportation equipment. The public transportation program expenditures focuses on replacement of vehicles and

other operating equipment as a means of improving public transit

!

operations, safety, and meeting the requirements of the Americans with Disabilities Act.

The Georgia Department of Transportation is pleased to make this

~

document available. We welcome any comments on the STIP; please send your comments to:

~

Georgia Department of Transportation Office of Planning

No. 2 Capitol Square

Atlanta, Georgia 30334

~

At_t: Marta V. Rosen

( 404) 656-5725

~ !

i

I

'4


GLOSSARY OF ACRONYMS AND ABBREVIATIONS

FUND SOURCE:

CATEGORIES OF FEDERAL HIGHWAY ACT (FHWA) FUNDING

CONG MIT./AIR QUAL - Congestion Mitigation/ Air Quality FED. LANDS - Federal Lands HWY. SAFETY - Highway Safety I-STATE MAINT. - Interstate Maintenance I-STATE CONST. - Interstate Construction NAT'L HIGHWAY - National Highway System OLD URBAN SYSTEM - funds allocated to Georgia before ISTEA SURFACE TRANSPORT. - Surface Transportation Program TRANS. ENHANCE. - Transportation Enhancement Assistance

CATEGORIES OF FEDERAL TRANSIT ACT (FTA) FUNDING

URBAN TRANSIT DISC. - Discretionary assistance awarded on a competitive basis by the FTA; ADA or CAA indicates Americans with Disabilities Act project or Clean Air Act project. URBAN TRANSIT - Urban Area assistance - can be capital or operating funds; ADA or CAA indicates Americans with Disabilities Act project or Clean Air Act project. ELDERLY & DISABLED - Assistance for Elderly and Handicapped capital projects. RURAL TRANSIT - Rural Area assistance - can be capital or operating funds.

OTHER ACRONYMS/ ABBREVIATIONS

1

BR - Bridge

CONG DIST. - Congressional District

CONST - Construction

CS - City Street

CR - County Road

CWP - Construction Work Program. The

Construction Work Program includes projects in

two phases 'Phase I (first three years of the

Program) and Phase II (next three years of the

Program). The STIP is derived from Phase I

projects.

FED SHARE - Federal Share of the cost of the

project

FM - Indicates "from"

GA. SHARE - Georgia Share of the cost of the

project

HOV LANES - High Occupancy Vehicle lanes;

designated lanes used exclusively for

multiple-occupancy vehicles.

INT - Intersection, usually seen as "Smith Road

Int Jones Street".

LGPA - Local Government Project Agreement. These

agreements outline highway and bridge project

responsibilities between the GDOT and the local

government. The status line will indicate if an

agreement has been requested, signed or refused

(a signed or refused agreement would have the

date of the transaction noted on the project

description). Most LGPA address sharing

responsibilities for right of way, utilities or

detours.

LOC SHARE - Local Share of the cost of the

project

N, S, E, W - North, South, East, West. May

also be used in combinations of NE, SW etc.

L

NB, SB, EB, WB - North Bound, South Bound, East Bound, West Bound - indicating direction of

movement. Sometimes will be shown as NBL, SBL,

EBL or WBL to indicate North Bound Lane, South

Bound Lane, East Bound Lane or West Bound Lane.

B OR BU OR BUS - Business Route

BYP - Bypass or Circumferential Route

L

CONN - Connector EXT - Extension

FRNTG - Frontage

NOISE BARR. - Noise Barrier

t I

PE - Preliminary Engineering indicates an early

phase of project development that may include

surveys, design, environmental and other work

done in project development.

P.I. NO. - Program Item Number is unique to each

project.

PKWY - Pa-rkway

RECST. OR REHAB. - Reconstruction or

Rehabilitation

RTL OR LTL - Right Turn Lane or Left Turn Lane

R/W or ROW - Right of Way

SR - State Route

T&S PROJECT - Traffic and Safety Project

TIP - Transportation Improvement Program

developed by the Metropolitan Planning

Organizations

UTL OR UTIL - Utilities

r=

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 1

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.
---

-

-

-

-

-

-

PROJECT
- .-

DATA
-

------ -

-

COMMENTS
-------------------

---------------------------Y-EA--R --------E-S-T-S

.-

ALL

LUMP SUM MAINT, FOR INTERSTATE MAINTENANCE "04M" FOR FY 97

PE NONE

$

0

04M097 MINOR WIDEN & RESURF / MAINTENANCE

CONG DIST. 99

ROW NONE

$

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1997

$ 27778

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 25000

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 2778

0TH SHARE $

ALL 04MB95
STATUS:

LUMP SUM BRIDGE PAINTING "04M" FOR FY 95 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 2000
1800 .200

ALL 04MB96
STATUS:

LUMP SUM BRIDGE PAINTING "04M" FOR FY 96 BRIDGES./ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1996 $

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 22000 19800 2200

ALL 04MB97
STATUS:

LUMP SUM BRIDGE PAINTING "04M" FOR FY 97 BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

, _ROW NONE $

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 4444 4000
444

~

m::;i:mo

~-~

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 1

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

----------------------------------------------------------------------------------------------------------------------------------

BANKS

I-85 SIGN MOD FM DEK CL

PE NONE

$

0

11044Y SIGNING/ MAINTENANCE

CONG DIST. 10 & 6

ROW NONE

$

0

PROJE.CT MILEAGE : 76. 00 - EXIST. LANES:

CONST 1995

$

0

MANAGER: L. SEABROOK

FUND SOURCE: I-STATE MAINT.

FED SHARE$

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

110440 IS AN ASSOCIATED PROJECT.

0TH SHARE$

BANKS 1B1004
STATUS:

COUNTY OPERATED PUBLIC TRANSIT FACILITIES/ FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1995

$

22

FUND SOURCE: RURAL TRANSIT

FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

9

BANKS 1Bl005
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: BANKS MANAGER: STEVE KISH

CONG DIST. 10

OPERATING 1996

$

24

FUND SOURCE: RURAL TRANSIT

FED SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

10

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BARROW 11044X
STATUS:

I-85 SIGN MOD FM DEK CL TO SC STATE LN.\~ACK/BANKS/GWN/FRANK SIGNING/ MAINTENANCE PROJECT MILEAGE : 76.00 - EXIST. LANES: )/fROPOSED LANES: 0 MANAGER: L. SEABROOK

CONG DIST. 10 & 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 110440 IS AN ASSOCIATED PROJECT.

BARROW 121730
STATUS:.

WINDER BYP FM SR 8 @ SR 11 NEAR :\8Mi( TO SR 53 @ $R 11
CONSTRUCTION OF NEW ROUTE WITH4::fhli\i!s PROPOSED.
PROJECT MILEAGE: 2.60 MANAGER: J. GRAYBEAL (M)
SEND LGPA IN 1997

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

BARROW , 132220

:ci!;T:.~:.i~'{~,iii!iff:.~!1~ ,!;e~'~g~T~.:Jlf 22O

PROJECT MILEAGE : 1.26

MANAGER: L. OWENS

STATUS: BARROW SGN 11-16-93 FOR

BARROW 170728
STATUS:

i 1
CR 72/BROWNS BRIDGE RD @ APALACHEE RIVER SW :F AUBp@jli REPLACEMENT OF THE EXISTING BRIDGES (S). FROM 1 TO 2::~ES. PROJECT MILEAGE : .20

;~!ijfil4 =~!R~G~-D~~~:, UTILITIES & DETOURS ll/~}j

NO UTIL

CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
DIST. 10 FUND SOURCE: BRIDGE PROGRAM
HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 2

FISCAL YEAR

COST ESTS

PE NONE $

0

ROW NONE $

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

PE ROW LOCL CONST

$ 187 AFTER 97

PE 1992 UNDERWAY

ROW 1995 $ 110

CONST 1996 $ 725

FED SHARE $ 580

GA. SHARE $

145

0TH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1996 $ 200

FED SHARE$ 160

GA. SHARE$

40

0TH SHARE$

=

~

"

COUNTY P.LNO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CLARKE 12],990
STATUS:

PRINCE AVE FM S/SR 8 TO 600' N/CSX RR INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .58 - EXIST. LANES: MANAGER: L. OWENS CO SGN 10-4-91 PUB UTIL;T&S REQ ROW,

JEFFERSON ST
8

ATHENS TIP i II-01
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122350 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 3

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1994

UNDERWAY

CONST 1995 $ 2797

FED SHARE $ 2238

GA. SHARE $ 559

0TH SHARE $

CLARKE 122350
STATUS:

SR 15/PRINCE AVE/N ATHENS REHAB. OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: L. OWENS _CLARKE SGN 10-4-91 FOR

ATHENS TIP i II-02 CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 121990 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1995

$

350

FED SHARE $ 280

GA. SHARE $

70

0TH SHARE $

CLARKE 12257Z
STATUS:

SR 10/US 78 MONROE UNKNOWN/ UNKNOWN PROJECT MILEAGE: MANAGER: UNKNOWN

CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

0

ROW NONE $

0

CONST 1997 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

CLARKE 122600
STATUS:

SR lOLP/ATHENS BYPASS RAMP/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: L. OWENS (M) SEND LGPA IN 199

}ATHENS TIP i III-05 /:/=coNG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 $

10

ROW 1996 $

10

CONST 1997

$

393

FED SHARE$

393

GA. SHARE$

0TH SHARE$

CLARKE 122680
STATUS:

SR 8/US 78@ HUNTINGTON RD AND ATHENS BYPASS INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : 53 - EXIST, LANES: 0 /PROPOSED LANES { MANAGER: L. OWENS REQ CLARKE DO UTILITIES 8-11-93 (CO REQ PLANS 12-6-93)

~=b iB#~Bf; t< : }coNG Disflfio FEDERAL'',1HGHWANYATA'D.;MHINIG: ?EW:'.V~NXPS

PE 1994

UNDERWAY

ROW 1995

$

150

CONST 1995

$

450

FED SHARE $

450

GA. SHARE $

. 0TH SHARE $

CLARKE 15021Y
STATUS:

CR 473/EPPS BR RD FM SR 10/0CONEE TO US 78 .. SEE OCONEE RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .00 MANAGER: .UNKNOWN

PE 1993

U!JDERWAY

ROW NONE

$

0

l~ii~itil~t:~~r~:~~~[~~ii

:

~;: ~~:! /CONST 1996

$ $ $ $

0

CLARKE 170920
STATUS:

UNIVERSITY OF GEORGIA EAST CAMPUS MULTI-USE TRAIL IN ATHENS BICYCLE/PED. FACILITY / ENHANCEMENT PROJECT MILEAGE : .00 EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: CHRIS SIMONS TO BE DONE BY CONTRACT

PE 1995 $

49

ROW LOCL

CONST 1995

$

316

FED SHARE $

253

GA. SHARE $

10

0TH SHARE $

73

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CLARKE 170923
STATUS:

HERITAGE TRAIL ALONG THE OCONEE RIVER Il't ATHENS BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /~0POSED LANES: 0 MANAGER: CHRIS SIMONS TO BE DONE BY CONTRACT

CONG DIST. 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

CLARKE 170925
STATUS:

~ ~~~5~H\o l b : o BIKEWAY/LANDSCAPING ON EPPS BRIDriii rt6fuf IN ATHENS

:!g~~~/:~~EA~!c;L~~~

/PROPOSED

MANAGER: B FERGUSON

TO BE DONE BY CONTRACT

ATHENS TIP t V-01
CONG DIST: 10
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

CLARKE 170926:
STATUS:

COLLEGE STATION RD BIKF; 4ful.IL IN ATHENS
~ :!g~~~/:~~EA~!c;L~~~ f~j~;E~is :" o /PRoPo~t,::l!fflf~: o
MANAGER: CHRIS SIMONS TO BE DON~ BY CONTRACT

CONG_DIST. 10_
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

CLARKE _170960
~TATUS:
CLARKE 170970
STATUS:

LUMPKIN ST/ BAXTER ST SIGNAL

: it !!g~; 'I-~~~iy: 00 - EXIST. LANES: 0 /PROPOSEP.

0

{isl: =:~:~~~ ~!~~i!D GOVERNMENT SGN 12-2h93/

~;GNALS

ATHENS CBD SIGNAL SYSTEM SIGNALS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED MANAGER: BURT RIDDLE . CONTACT TRAFFIC OPERATIONS

:.::\i{':':}ATHENS TIP t III-02
:(ioNG DIST. 10

FUND SOURCE': HWY; SAFETY

::i # FEDERAL HIGHWAY ADMIN FUNDS

. :::::=~S

III-04

//CONG DIST} fo

FUN;Jipltf: HWY ,/SAFETy;)ii= FEDERAL 'HIGHWAY ADMIN.::FUNbS

CLARKE 170980
STATUS:

REALIGNMENT OF RIVERBEND RD FM MINOR WIDEN & RESURF /. SAFETY PROJECT.MILEAGE : 1:46 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: L. OWENS (C) REV REQ ATHENS/CLAREK DO ROW, UTILITIES AND PE 2~8-94 OTO

k~f' <<';ttb souRcif

~AFETY

FEDERAL :!il:GHWAY ADMIN

CLARKE lDlOll
STATUS:

VEHICLES, CAP. MAINT., REPAIRS, TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT
MANAGER: STEVE KISH LGPA NOT APPLICABLE

SIGNS, POLES, SYSTEM

SHELTERS,

ETC.

CONG DIST. \10
FUND SOURCE: FEDERAL TRANSIT

22-Feb-1994 Page 4

FISCAL YEAR

COST ESTS

PE 1996 $

36

ROW Loci.

CONST.. 1996 "$

235

FED SHARE$ 188

GA. SHARE$

7

0TH SHARE$

54

PE LOCL

ROW LOCL

CONST i995

$

675

FED SHARE$ 540

GA. SHARE$

0TH SHARE$

135

PE 1996 .$

20

ROW 1996 $

16

CONST 1996 .$ 214

.FED. SHARE'$

171

GA. SHARE$

7

0TH SHARE$

50

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
.105 _95
- 11

PE NONE $

0

ROW NONE $

0

CONST 1996 $ 220

FED _SHARE $ 198

GA. SHARE$

22

0TH SHARE$

PE LOCL ROW Loci
1995 $ FED SHARE$ GA, SHARE$
0TH SHARE$

270 243
27

1995

$ 357

. FED SHARE $ 286

GA. SHARE$

36

0TH SHARE$

36

,-

l!!!!!!!!!e

lffll!!!!l!I

-

' .......,

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 5

FISCAL YEAR

COST ESTS

CLARKE 1Dl012
STATUS:

VEHICLES, CAP. MAINT., SHELTERS, BUS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE

POLES, ETC.

CONG DIST. 10

CAPITAL 1996

$

425

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $ 340

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

43

0TH SHARE $

43

CLARKE 1Dl014
STATUS:

ADA EQUIPMENT FOR BUSES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ATHENS MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 10

CAPITAL 1995

$

11

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

10

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

1

0TH SHARE $

1

CLARKE 1Dl017
STATUS:

PUBLIC TRANSIT TRANSIT PROJECTS FUNDS RECIPIENT: ATHENS MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1995 $ FED SHARE $ GA. SHARE $
0TH SHARE $

1100 550
550

CLARKE 1Dl018
STATUS:

PUBLIC TRANSIT SERVICE FOR ATHENS AND CLARKE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ATHENS TRANSIT SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996 $ FED SHARE $ GA. SHARE $ 0TH SHARE $

1300 364
1 937

CLARKE lVlOll
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA MANAGER: STEVE KISH

DIST:; \fo
FUNo]ip~tf = ELDERLY , FEDl!JRAtt:-'l'RANSIT ADMIN

CAPITAL 1995

$

15

FUND FED SHARE$

12

GA. SHARE$

2

0TH SHARE$

2

CLARKE 1Vl012
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN ATHENS MPO AREA MANAGER: STEVE KISH

DIST. 19)(
'ittb souRcir'ELbERLY &
FED:E:RAL_,,'rruui$:i:T ADMIN

1996

$

16

FED SHARE$

13

GA. SHARE$

1

0TH SHARE$

2

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DAWSON 122040
sTATUS:

SR 9 FM SR 53 TO NEAR CR
TURN LANES/ SAFETY PROJECT MILEAGE : 1.00 MANAGER: L. OWENS (M) CITY DAWSWONVILLE SGN 12/8/89 ROW &

cs 501 3

CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 6

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW LOCL

CONST 1997

$

678

FED SHARE$

610

GA. SHARE$

68

0TH SHARE$

==

~

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DEKALB 12236X
STATUS:

SR 124 CONN/SR 890 FM ST MTN FWY TO SR UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: BILL MOSKAL

GWINNETT 0

CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122360 IS AN ASSOCIATED PROJECT,

22-Feb-1994 Page 7

FISCAL YEAR

COST ESTS

PE ROW CONST

$

0

AFTER 97

AFTER 97

COUNTY P.I.NO.

DESCRIPTION PROJECT DJ\TA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 8

FISCAL YEAR

COST ESTS

ELBERT 12264X
STATUS:

SR 72 FM W OF FORK CK TOE OF BROAD RIVER/SEE MADISON

UNKNOWN / UNKNOWN

- -

PROJECT MILEAGE : . 00 - EXIST. LANES: 0 )ifa,()POSED LANES: 0

MANAGER:

PE 1994

CONG DIST. 10

ROW 1997

GRIP PROJECT

CONST

FOND SOURCE: GOVERNOR'S RO IMP PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

UNDERWAY

$

0

AFTER 97

ELBERT 170990

CR 168/GOss ROAD @ souTH BEAVERDi$i:BI~{ NW OF EiifikToN REPLACEMENT OF THE .EXISTING BRti:ii;tjl{sj . NO ADDED LANES. PROJECT MILEAGE : .20

STATUS: ~:~~R~I~NEg~~!, UTILI-::T_.::::;i.._f.;:g-.:--:J)bi~OURS 10-12-93

ELBERT 170991
STATUS:

CR 183/CO~OWATER P~~!~j~~RO@ GUM LOG BRANCH

REPLACEMENT OF THE EXISiffiiG BRIDGES(S). NO ADDED

PROJECT MILEAGE : 19 '\/):

MANAGER: L. OWENS

\} '

ELBERT SGN DO ROW, UTILITIES h'h:iETOURS

ELBERT 1B1009
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH

ELBERT 1B1010
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FONDS RECIPIENT: ELBERT MANAGER: STEVE KISH

ELBERT 1C2009
STATUS:

ONE STANDARD VAN ANO ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: ELBERT MANAGER: STEVE KISH LGPA NOT APPLICABLE

ELBERT 1C2010
STATUS:

ONE STANDARD VAN ANO ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS_ RECIPIENT: ELBERT MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 10 FOND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS

PE 1994

UNDERWAY

ROW LOCL

CONST 1996 $ 282

FED SHARE$ 226

GA. SHARE$

56

0TH SHARE"$

PE 1994 UNDERWAY

ROW LOCL

CONST 1996 $ 173

FED SHARE$

138

GA. SHARE$

35

0TH SHARE$

DIST. 10

OPERATING 1995 $

82

FOND SOURCE: RURAL TRANSIT

FED SHARE$

48

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

34

\~Q~G DI~":r)(10

FONo:l6W2i:

RURAL

TRANsif

A

,,

9 OPERATrn~E~ ~!ARE

:

87 51

FEDt~::TRANSIT AbMINFUNDS

GA. SHARE$

0TH SHARE$

36

t:{Bb~G

::iJJ; -SOURCE( RURAL TRANSIT

,fruilisIT FEDERAL ---, ....-, ..,

.

ADMIN

1995

$

21

FED SHARE $.

17

GA. SHARE$

2

0TH SHARE$

2

FOND SOURCE: FEDERAL TRANSIT

CAPITAL 1996

$

21

FED SHARE$

17

GA. SHARE$

2

0TH SHARE$

2

"""""""' """""""' """""""' =

~

1--.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FORSYTH 122012
STATUS:

SR 369@ CHATT'CHEE RVR/L LANIER(NEW PAllll:LLEL BR] . HALL

REHAB. OF THE EXISTING BRIDGE(S). FROM .2\I.ANES TO 4 LANES.

PROJECT MILEAGE : . 00

......

MANAGER: B FERGUSON (M)

HALL SGN 5-13-91 AND FORSYTH SGN 8-26-,91 f6itittTILITIES.

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 122015 IS AN ASSOCIATED PROJECT.

FORSYTH 122390
STATUS:

sR 306 EXT FM sR 20 EAST To sR 9h!i#:6c;ExisT Lod \.() sR 400

CONSTRUCTION OF NEW ROUTE WITH/4:tfiliii:'s PROPOSED.

PROJECT MILEAGE ; 4.90

MANAGER: B FERGUSON (M)

SEND LGPA WHEN PROJECT IS

TO CWP

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

FORSYTH 122550
STATUS:

;;v SR 9 AT SR 20 SOUTH dJ~ING

INTERSECTION IMPROVEMENT// SAFETY

.



PROJECT MILEAGE : 00 - E#ST . LANES: 0 /PROPO$iili:5: ~ i s : 0

MANAGER: B FERGUSON

CONTACT TRAFFIC OPERATIONS

CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

FORSYTH 132390
STATUS:

SR 306 AT SR 369 INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .53 - EXIST. LANES:
MANAGER: L. OWENS COUNTY SGN 12-14-92 FOR UTILITIES

FUND SOURCE: HWY. SAFETY FE--D: E..R..A...L.. . HIGHWAY ADMIN FUNDS

FORSYTH 132510
STATUS:

SR 53 AT CR 226/CRYSTAL COVE-WESTBROOK ROADS INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : . 00 - EXIST. LANES: 2 /PROPOSED
MANAGER: L. OWENS(M) SEND LGPA IN 199

FORSYTH 141605
STATUS:

SR 20/SR 9/CUMMING@ CS 526; & CR 87

INTERSECTION IMPROVEMENT/ SAFETY

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: L. OWENS

COUNTY REFUSED DUE TO COST 9-15-93

OTO PROJECT.

*~~i ::::~ti~Jl!~:::,lf, FEDERAL HIGHWAY

FORSYTH 141940
STATUS:

SR 306 AT CR 201/BETTIS TRIBBLE GAP RD IN CUMMING INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 3 MANAGER: L. OWENS SEND LGPA IN 199

CONG :~:,~9
FUND SOURCE: HWY FEDERAL HIGHWAY

22-Feb-1994 Page 9

FISCAL -YEAR

COST ESTS

PE ROW NONE CONST

$

75

$

0

AFTER 97

PE
ROW CONST

$ 158
AFTER 97 AFTER 97

PE NONE $

0

ROW 1995 $ 100

CONST 1996 $ 400

FED SHARE$ 360

GA. SHARE$

40

0TH SHARE$

PE 1994 UNDERWAY

ROW 1995

$

4

CONST 1996 $ 310

FED SHARE $ 279

GA. SHARE $

31

0TH SHARE $

PE NONE ROW 1997 CONST

$

0

$

30

AFTER 97

PE NONE

$

0

ROW LOCL

1997

$

385

FED SHARE $ 347

GA. SHARE $

39

0TH SHARE $

PE NONE

$

0

ROW 1995

$

23

CONST 1996

$

129

FED SHARE $

116

GA. SHARE $

13

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION .IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FORSYTH. SR 400@ MCFARLAND, SR 141, SR 171120_ SIGNALS/ SAFETY
PROJECT MILEAGE_: .00 - EXIST. LANES: MANAGER: BURT.RIDDLE
STATUS: FORSYTH COUNTY SIGNED FOR UTILITIES

SR 20@

CONG DIST. 9
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 10

FISCAL YEAR

COST ESTS

PE 1994

$

8

ROW NONE

$

0

CONST 1995

$

420

FED SHARE$

378

GA. SHARE$

'42

0TH SHARE$

FORSYTH 171140
STATUS:

POOLE'S MILL COVERED BR BRIDGES / ENHANCEMENT_
PROJECT MILEAGE : . oo
MANAGER: . UNKNOWN DOT WILL PROVIDE THE

CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1995, $
FED SHARE$ GA. SHARE $
0TH S_HARE $

0
0. 132 106
26

FORSYTH 1B1014
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995 $

53

FUND SOURCE: RURAL TRANSIT

FED SHARE$

31

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

22

FORSYTH 1Bl015
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FORSYTH MANAGER: -.STEVE KI SH

DIST. 9 RURAL TRANSIT

-OPERATING 1996 . $

56

FED SHARE$

33

GA. SHARE $

0TH SHARE$

23

FORSYTH 1C2014.
STATUS:

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: FORSYTH MANAGER: STEVE KISH LGPA NOT APPLICABLE

1995

$

21

FED SHARE$

17

GA. SHARE $

2

0TH SHARE$

2

~

,,



COUNTY P.I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FRANKLIN I-85 SIGN MOD FM DEK CL 11044W SIGNING/ MAINTENANCE
PROJECT MILEAGE : 76,00 - EXIST. LANES: MANAGER: L. SEABROOK STATUS:

CONG DIST. 10 & 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 110440 IS AN ASSOCIATED PROJECT.

FRANKLIN I-85 UPGRADE NB REST 110460 REST AREA/ RECST, OR
PROJECT MILEAGE : .00 MANAGER: J. GARLAND STATUS: NOT APPLICABLE

CONG DIST. 10 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

FRANKLIN I-85 SB WELCOME 110510 REST AREA/ RECST, OR
PROJECT MILEAGE: 1.00 MANAGER: J, GARLAND
STATUS:

CONG DIST. 10
0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

FRANKLIN SR 17[@I-85 RECST INTERCHANGE-IM]FM NCL 12Y080 RECONSTRUCTION & WIDENING FROM 2 LANES TO
PROJECT MILEAGE: .00 MANAGER: UNKNOWN STATUS:
FRANKLIN CROMER'S MILL COVERED BRIDGE OFF SR 106 OVER 171150 BRIDGES/ ENHANCEMENT
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS: DOT WILL PROVIDE THE 20% MATCH

DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 122080/f.S. AN ASSOCIATED PROJECT.
o,~Jli,

22-Feb-1994 Page 11

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

PE 1994

$

ROW NONE

$

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

39 0
1310 1179
131

PE 1995 $

ROW 1994

$

CONST 1995 $

FED SHARE $

GA. SHARE $

0TH SHARE $

100 616 4388 3949
439

PE 1994 ROW 1995 CONST

UNDERWAY

$

0

AFTER 97

PE NONE $

0

ROW NONE $

0

CONST 1995

$

135

FED SHARE$

108

GA. SHARE $

27

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 12

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

G--W-IN-N--ET-T--I---8-5-.-IN-T-E-R-C-H-A-N-G-E---&--SU-G-A--RL-O-A-F--F-M---SR---1-2-0--TO---S-A-T-E-L-L-IT--E--&--1-1Y--2-3-0------A-T-LA--N-T-A--T-I-P--i--G-W---R--7-2--------------'

----Y--EA-R---------E-S-T-S--

PE 1988

UNDERWAY

110230 INTERCHANGE / NEW CONSTRUCTION

.<\:::: .

CONG DIST. 6

ROW 1995

$ 6325

PROJECT MILEAGE : 1. 50 - EXIST. LANES: o}Jt,1wPOSED LANES: 6

CONST 1995

$ 12185

MANAGER: J. GRAYBEAL (CM)

':c,

STATUS: co SGN 9-22-92 P UTL & $13M CST; ws REt>:tlB~p (:). _$SM 11-22-93

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 9748 GA. SHARE $ 2437

11Y230 IS AN ASSOCIATED PROJECT.

0TH SHARE $

GWINNETT I-85 FM s OF BOGGS RD TO N OF su&ii.81& PARKWAY i'i1Y231

110231 INTERCHANGE / NEW CONSTRUCTI01'1)/ (})

/

PROJECT MILEAGE : 2. 30 - EXIST?:i:Jliras: 8 /PROPOSED 'BfuEs: 12

MANAGER:

STATUS: SEE 110230

1
GWINNETT I-85 FM N OF SUGARL:;J !iit.N OF OLD P' TREE & CD SYS~,~~~tY233 110233"
;:~~~~~~E{G:E~ i~~~T!tt~~i~~- LANES: 8 /PROP9$l&:-~s: 12
MANAGER:. STATUS: SEE 110230

CONG DIST. 6 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 6 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1988

UNDERWAY

ROW 1996

$ 6420

CONST 1997

$ 30727

FED SHARE $ 27654

GA. SHARE $ 3073

0TH SHARE $

PE 1988 ROW 1997 CONST

UNDERWAY $ 5100 AFTER 97

GWINNETT I-85@ SR 317/SUWANEE 110235 LIGHTING/ RECST. OR REHAB.
PROJECT MILEAGE: .00 - EXIST. MANAGER: J. GARLAND STATUS: REQ CO DO LIGHTING ~ RD DESIGN

& 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

GWINNETT I-985@ SR 20 (SR 20 TO 3 LANES)

~~~: 110330: INTERCHANGE/ RECST. OR PROJECT MILEAGE : .39 -

LANES: 2 /PROPOSED LANES{\~

MANAGER: B FERGUSON (M)

STATUS: GWINNETT SGN 12-18-92 FOR PUB UTIL; BUFORD REFUSED

, ; ; ; : ~ , ~ Gw-R 69
F~~Ii~~~i: ~AT'.~: HIGHwiW\ FEDERA!. HIGHWAY AriMIN ,ttiijbs

GWINNETT I-85@ SR 20/LAWRENCEVILLE HIGHWAY 110360 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : 1.52 - EXIST. LANES: 2 /PROP~SED LANES: 4
MANAGER: B FERGUSON STATUS: GWINNETT siGNED 10-9~92 FOR PUBLIC UTILITIES ONLY

g~ t:: :..:.i..I.,.AC.OLNI!Gl!!D!.I>S::TTI. p10*,..',:,_.,R&.6/'.
FUND SOURcfi'isTATE MAINT.
FEDERAL itIGHWAY ADMIN

GWINNETT I-85 UPGRADE REST AREAS i75 & i 76 110430 REST AREA/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: J. GARLAND STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP

CONG DIST. i:10
FUND SOURCE: FEDERAL HIGHWAY

PE NONE

$

0

ROW NONE

$

0

CONST 1995 $

58

FED SHARE$

46

GA. SHARE$

12

0TH SHARE$

PE 1993 ROW 1997 CONST

UNDERWAY $ 1919 AFTER 97

PE 1993

UNDERWAY

ROW 1995 -,,rnhl 1996

$ 3049 $ 12595

FED SHARE.$ 11336

GA. SHARE$ 1260

0TH SHARE$

PE 1995
ROW NONE CONST

$

110

$

0

AFTER 97

"

"""""""'

= =

=

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GWINNETT I-85 SIGN MOD FM DEK CL TO SC STATE LN.\JACK/BANKS/BAR/FRANK 110440 SIGNING/ MAINTENANCE
PROJECT MILEAGE : 76.00 - EXIST. LANES: ~'\zgROPOSED LANES: 0 MANAGER: L. SEABROOK STATUS: NOT APPLICABLE

CONG DIST. 10 & 6
FUND SOURCE: I-STATE MAINT: FEDERAL HIGHWAY ADMIN FUNDS 11044W IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 13

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

144

FED SHARE $

144

GA. SHARE $

0TH SHARE $

GWINNETT I-85 @ SUGARLOAF - TO SHOW IM Fu&Bf\~
11Y230 INTERCHANGE / RECST. OR REHAB.{ PROJECT MILEAGE : . 00 - EXIST~:.CiLANES: 0 /PROPOSED MANAGER: UNKNOWN
STATUS:

ATLANTA TIP i GW-R 72

PE NONE

$

0

CONG DIST. 6

ROW NONE $

0

0

CONST 1995

$ 3250

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 2925

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

325

110230 IS AN ASSOCIATED PROJECT.

0TH SHARE $

GWINNETT 11Y231
STATUS:

CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW 1996

$

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 380 1389
1111 278

GWINNETT I-85 FM SUGARLOAF TO OLD PEACHTREE 11Y233 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: STATUS:
GWINNETT SR 20 ON EXT LOC FM I-85 FOR 0.5 MI;NEW LOC 120680 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.10 MANAGER: B FERGUSON (M) STATUS: COUNTY REFUSED 1/92; BUFORD REFUSED 2/92 BUT WANTS PLANl{:i//

DIST. 6
: ~~J,~FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
GW 14 F~;ig~t:if: SURFACE T~1i&JY>
FEDEllidfi:GHWAY ADMIN FUNDS

PE NONE ROW 1997 CONST
PE 1993 ROW 1996 CONST

$

0

$

500

AFTER 97

UNDERWAY $ 4569 AFTER 97

GWINNETT SR 10/STONE MTN FWY FM ROCKBRIDGE RD TOE/HEWATT RD 121490 RECONSTRUCTION & WIDENING FROM 6 LANES TO 8 LANES.
PROJECT MILEAGE : 2.90 MANAGER: BILL MOSKAL (M) STATUS: GWINNETT SGN FOR PUBLIC UTILITIES 1-21-93.

:;1i;~si:P 4.!;tc
Filii~ souRdf:}tkJ/; L HIGHWAY
FEDERAL .HIGHWAY ADMIN FUNDS .( \.
12Y490fs)AN ASSOCIATED PRc::>JECTi

PE 1993 ROW 1995 ........ :coNST

UNDERWAY $ 2500 AFTER 97

GWINNETT P'TREE IND BLVE FM SR 20/SUGAR HILL NE TO RELOC SR 347/HALL 121676 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 4.50
MANAGER: B FERGUSON STATUS: REQ B'FD R&U 2/93;GAIN'VL Y SHILL P UTIL 11/93; CO REFUSED

ATLAN::,~[~ i GW 100 .(

CONG DIST. \10

.. ..

FUND souRcE: SURFA2fJ4~sPoRT.
FEDERAL HIGHWAY Apfiii'I FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$ 7500

FED SHARE$ 6000

GA. SHARE$ 1500

0TH SHARE$

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GWINNETT SR 124 FM CENTERVILLE-ROSEBUD RD TO HENRY CLOWER BLVD 121720 RECONSTRUCTION & WIDENING FROM 2 LANES T\._4 LANES.
PROJECT MILEAGE : 3.90
fyf::&ffdh>.. MANAGER: RAY METTS (CM)
STATUS: GWINNETT SGN 1-8-92 PUB UTIL (REFUSED

ATLANTA TIP lt GW 76 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

~:~:if GWINNETT

(ML

~:~~:+.f~!!!itd~ 122490

~:Ti!~H~Giu~~g~. P
PROJECT MILEAGE : . 00 - EXIST'{:j;iillits: 2 /PROPOSED dfil'.Es: 4

~:y:!~ :lKfr;o STATUS: ~A~~r~-t3

SAA

SEND OUT. -

ATLANTA TIP# GW-R 101 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

GWINNETT SR 10/STONE MTN F::,,t; OF HEWATT RD TO

122520 RECONSTRUCTION & WIDENING'\FROM 6 LANES TO 8

PROJECT MILEAGE : 3. 2 5 ::c::):,\_

MANAGER.: BILL MOSKAL

"\):\,,.

STATUS: REQ COUNTY DO UTILITIES 10-14f8~;..

ATLANTA TIP lt GW 57 CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 14

FISCAL YEAR

COST ESTS

PE 1992 ROW 1997 CONST

UNDERWAY $ 5166 AFTER 97

PE 1993

UNDERWAY

ROW 1994

$ 2006

CONST 1996

$ 3228

FED SHARE $ 2582

GA. SHARE $

646

0TH SHARE $

PE 1994 ROW 1996 CONST

UNDERWAY $ 9035 AFTER 97

GWINNETT SR 316@ SR 20 122530 TURN LANES/ SAFETY
PROJECT MILEAGE: .36

m:it; EXIST. LANES: 0 /PROPOSED

0

MANAGER: L. OWENS

STATUS: GWINNETT SGN FOR PUBLIC UTILITIES 12-15-92 ..

OTO

GWINNETT SR 124 AT CLYDE WILLIAMS BOULEVARD NORTH OF sNJi't:tvILLE

122720 INTERCHANGE / NEW CONSTRUCTION

_

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES::

MANAGER:

STATUS:

FUND SOURCE: NAT'L'HIGHWAY
fEDE~. HIGHWAY ADMIN FUNDS
:-.:-:.::::::;;\\:
). }\.
>c::e:m~ DisI J .:.;-::-::.::::-:-:--.
FUN~ :J6w2i\i: DEMONSTRATfO~ tttai&.M
FEDi.itALHiGHWAY ADMIN'FUNDS

PE NONE

$

0

ROW LOCL

CONST 1996

$

223

FED SHARE$

223

GA. SHARE $ -

0TH SHARE$

PE 1995 ROW 1996 CONST

$

100

$

300

AFTER 97

GWINNETT SR 10 FM ROCKBRIDGE TO HEWATT - PARTIAL R/W FOR 121490 12Y490 UNKNOWN/ RECST. OR REHAB.
PROJECT MILEAGE .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: STATUS:

GWINNETT SR 13/BUFORD HIGHWAY@ GEORGE PIERCE PARK.

132320 TURN LANES/ SAFETY

PROJECT MILEAGE : _.15 - EXIST. LANES: 2 /PROPOSED LANES: 3

MANAGER: L. OWENS

STATUS: GWINNETT SGN 5-21-92 ROW & UTILITIES

OTO

A'l'tANTA TIP 1t GW i:24

)::{/cONG DI ST . 4 .,:::}( ,: ';::::;:::-

:Jit:~ =t;~; SOURCE;

HIGHWAY

FEDERALil:iGHWAY ADMIN
12149.0/fs 'AN ASSOCIATED

ATLANTA TIP lt GW CONG DIST ._,'6 -
FUND SOURCE: -HWY FEDERAL HIGHWAY

PE NONE ROW 1996"
NONE

$

0

$ 13500

$

0

PE NONE

$

0

ROW LOCL

CONST- 1995

$

187

FED SHARE $

168

GA. SHARE $

19

0TH SHARE $

.. "

)
,.

"

COUNTY P. I.NO.

DESCRIPTION
PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/eY 1997
COMMENTS

GWINNETT SR 13/BUFORD HWY FM OLD PEACHTREE RD TO---SUGARLOAF PKWY

132360 RECONSTRUCTION & WIDENING FROM 2 LANES Q_._4 LI\NES.

PROJECT MILEAGE : 00

coNs_Tf~f~TibN MANAGER: GENE POWELL (M)
STATUS: REQ couNTY no UTILITIES, Row & 20%

1-22-93

ATLANTA TIP ti GW ,a
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 15

FISCAL ,EAR

COST ESTS

" 1996
ROW LOCL CONST

$ "
" AFTER

GWINNETT RONl'.l.O REAGAN PARKWAY @ CLYDE WILLIAMS' -BLVD

132370 INTERCHANGE / NEW CONSTRUCTION -. - , ,

PROJECT MILEAGE : . 00 EXIST:.'),~;.;~-: 0 /?ROPOSED

MANAGER: J. GRAYBEAL

. ;:

STATUS:

,;.,,,, "'' ,, C,
nSS' '<""'

;,_ -,,_.,.,,.,.' <;;_::--

CONG DIST .
0

" 1995
ROW 1996 CONST

$

160

$ 1500

AFTER 97

FUND SOURCE: DEMONSTRATION PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

GWINNETT SR 324 AT CR 203 ANO c:ii:-:_211 141800 INTERSECTION IMPROVEMENT_/-. SAFETY

,..)\).'

P!tOJtCT MlLEAGE : ,50 - EXlS_'!', LANES: 2 /PROPO_s}i:,D_' riiiliiis: 2

MANAGER: L. OWENS

. " ,,,

''6i

STATUS: GWINNEtT SIGNED FOR PUBLIC UTJ':t,:;l_T_I_ES 12-18-:,2'/'. -;_.-

6T_o

ATLANTA TIP f GW 131
CONG DIST. 10
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS

" 1994
ROW 1995

UNDERWAY

$

50

CONST 1995

$

262

''' ,so SHARF,
GA. SHARE Q,H SHARE

' "26

GWINNETT CR 1943/MT MORIAH ROAD@ LITTLE MULBERRY RIVER 141950 REPLACEMENT OF THE EXISTING BRIDGES (S). NO ADDED
PROJECt MILEAGE : .20 MANAGER: L. OWENS STATUS: SEND LGPA 10/94-
GWINNETT KILLIAN HILL RD FM US 29 TO FlVE FORKS 150260 Rl!:CONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE : 00
MANAGER: D. SMITH STATUS: CONTRACT REQ COONTY DO ROW, UTIL, PE, 20\ CONST- 9-24-93

DIST. 10
SOURCE: BRIDGE PROGRAM FEpE_R?,,L, HIGHWAY ADMIN FUNDS
. ;~~:T~ ;~k i GW 7 ._,_ CONG DIST:( (Jl '.,",',,, _.w '".'' FUND:..'i6uncit: soRFAcE TRANSPOR;/_-:.FEoERA.t; aIGawAY ADMIN.FUNDS

" 1995
ROW LOCL

'

5

' CONST 1997 FED SHARE $

" '26D

GA. SHARE $

65

'' SHARE $

" 1995
ROW LOCL CONST

$

,0

AFTER 97

:.;:\;';.. .''::ti-'./}?:

" GWINNETT KILLIAN HILL RD FM FIVE FORKS TRICKOM TO OS
150270 RECONSTRUCTION & WIDENING FROM 2 I.ANES tO 4 LANE$. PROJECT MILEAGE : .00 MANAGER: D. SMITH
STATUS: Ct REQ CO DO PE, ROW, UTIL, 20% CST 9-24-93

)).i~TA TIP jf

PE 1995

''-'.".,CONG IHST. 4

ROW LOCL

_,._ ' ; ::_'CONST

--FliND souR~i'ii~tii:;.FAcE TRANSP~~";_{','.'_':

:~:-~ FEDE-R~A~L. H:tC1lWAY ADMIN FONDS .. : -

'(.,:-

AFTER 97

GWINNETT FIVE FORKS TRICKUM FM KILLIAM HILL RD TO OAK RD
150280 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 2.47
MANAGER: D. SMITH STATUS: CONTRACT REQ CO DO ROW, UTIL, PE & 20% CONST 9-24-93

ATLANTA TfP 8 GW 4
CONG DIST. ,4
FUND SOURCE: SURFACE:-TRANSPORT. FEDERAL HIGHWAY ADMIN' FONDS

PE 1995 ROW I.OCL CONST

$

,0

AFTER 97

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GWINNETT TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN 170950. SIGNALS / SAFETY
PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: BURT .RIDDLE STATUS: GWINNETT SGN 8-17-93 ROW,

ATLANTA TIP# GW 135 CONG DIST. 4 & 6 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 16

FISCAL YEAR

COST ESTS

PE 1994

$

325

ROW NONE

$

0

CONST 1995

$

510

FED SHARE $

408

GA. SHARE$

54

0TH SHARE,$

156

GWINNETT CR 685/WESTBROOK ROAD@ IVY 171110 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE.: .20
MANAGER: L. OWENS STATUS: SEND LGPA IN 1997

CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995

$

8

ROW LOCL

CONST 1997

$

280

FED SHARE $

224

GA. SHARE $

56

0TH SHARE $

GWINNETT CR 449/RIVER DRIVE 1711~0 REPLACEMENT OF THE
.PROJECT MILEAGE.:.
MANAGER: L. OWENS STATUS: SEND LGPA 10/94.

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
'-.

PE 1995

$

8

ROW LOCL

CONST 1997

$

445

FED SHARE $ 356 GA. SHARE $ . '89

0TH SHARE $

GWINNETT CR 1959/CENTERVILLE-ROSEBUD 171135 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .20 MANAGER: L. OWEBNS STATUS: SEMO LGPA 10/94

DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995

$

8

ROW LOCL

CONST_ 199_7

$

318

FE_D SHARE $ 254

GA. SHARE $

64

0TH :$HARE $

GWINNETT CAPITAL FOR GWINNETT COUNTY VANPOOL PROJECT 1D7036 :TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
GWINNETT CAPITAL FOR VANPOOL PROJECT 1D7037 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE

it~!i !jf ) 1
)' ()NG DIST. 4,,J
FUND sou1i.~i] 1tiU~ TRANSIT
FEDERAL-TRANSIT ADMIN

192 154 19
19

1995

$

100

FED SHARE $. 50

GA. SHARE.$

0TH SHARE.$

50

GWINNETT CAPITAL FOR COORDINATED E & H SERVICES FOR GWINNETT COUNTY 1D7038 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY
MANAGER: STEVE KISH STATUS: NOT APPLICABLE

CONG DIST ..,,.4
FUND SOURCE: FEDERAL TRANSIT

CAPITAL 1995

$

703

FED SHARE$

562

GA. SHARE$

71

0TH SHARE$

70

.. ,.

/I

,.

-

.....,,.,.,,

.,ll!!!l!!!!!!!!'

"

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GWINNETT COORDINATED E & H SERVICES FOR GWINNE'TT'::CC)UilT 107039 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE

CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 17

FISCAL YEAR

COST ESTS

OPERATING 1995

$

348

FED SHARE $

174

GA. SHARE $

0TH SHARE $

174

GWINNETT CAPITAL FOR GWINNETT COUNTY 107040 TRANSIT PROJECTS/ CAPITAL.
FUNDS RECIPIENT: GWINNETT MANAGER: STEVE KISH STATUS: NOT APPLICABLE

CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$ 288

FED SHARE $

230

GA. SHARE $

29

0TH SHARE $

29

GWINNETT VANPOOL SERVICE FOR r-rof~M~TT
107041 TRANSIT PROJECTS/ FUNDS RECIPIENT: MANAGER: STEVE KISH
STATUS: NOT APPLICABLE

CONG DIST. 4 & 10
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996

$

100

FED SHARE $

50

GA. SHARE $

0TH SHARE $

50

GWINNETT CAPITAL FOR COORDINATED E & H SERVICES 107042 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE

DIST. 4 & 10
SOURCE: URBAN TRANSIT TRANSIT ADMIN FUNDS

CAPITAL 1996

$ 607

FED SHARE $

486

GA. SHARE $

60

0TH SHARE $

61

GWINNETT COORDINATED E & H SERVICES FOR GWINNETT 107043 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1Vl029 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE
GWINNETT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 1Vl030 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN GWINNETT COUNTY MANAGER: STEVE KISH STATUS: NOT APPLICABLE

URBAN TRANifrf ( -.. OPERATIN~E~ 9;!ARE ;

348 174

DIST

,,,;:;J,1,,ADMIN FUNbS :.-.-:-:-::

GA. SHARE $ 174
0TH SHARE $

4

i!~ souRd{l~tb;RLY & oisJ;;;;:~~TAL

5 sHARE;

42 34

FED.Ii,~ ".r~~!T ADM IN FUNDS / '

GA. SHARE $

4

:::::~: :~:.n1I;f~:~:' :=; 4

44

FEDERAL TRANSIT ADMIN FUNDS

~~~TAL ::~,
GA. SHARE$

35
5

0TH SHARE$

4

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HABERSHA SR 17 FR 3-LANE@ SUTTON MILL CK TO SR 122440 RECONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE: 1.00 MANAGER: EX OWENS (M) -STATUS: SEND LGPA IN 1997

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 18

FISCAL YEAR

COST ESTS

PE 1993 Row 1997
CONST

UNDERWAY $ 243 AFTER 97

HABERSHA SR 105 EB MP 6.95-8.0; WB 8. 122450 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 2.05 MANAGER: L. OWENS (M) STATUS: SEND LGPA WHEN PROJECT

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY.ADMIN FUNDS

PE ROW CONST

$

27

.AFTER 97

AFTER 97

HABERSHA SR 105 OVER SOQUEE 122455 REHAB. OF THE EXISTING
PROJECT MILEAGE : .00 MANAGER: L. OWENS (M) STATUS: SEND LGPA IN 1997

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM .FEDERAL HIGHWAY ADMIN FUNDS

PE ROW NONE CONST

$

5

$

0

AFTER 97

HABERSHA CR 97/WELCOME HOME CHURCH RD OVER SOUTHERN 170890 REPLACEMENT OF THE EXISTING BRIDGES(S). NO
PROJECT MILEAGE: .27 MANAGER: . L. OWENS STATUS: HABERSHAM SGN DO ROW, UTILITIES &
HABERSHA CR 94/NANCY TOWN RD OVER SOUTHERN RR NE OF MT 170891 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER: L. OWENS
STATUS: HABERSHAM SGN DO ROW, UTILITIES & DETOURS 4-20-92
HABERSHA TALLULAH GORGE TRAILS/LANDSCAPING ALONG OLD 441; SEE RABUN 17104X. BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN STATUS:
HABERSHA COUNTY OPERATED PUBLIC TRANSIT SERVICE 1Bl019 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE KISH STATUS:

DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
Disi'[ it:
F~;:16Wtf: BRIDGE PROGi&J;;> FEDE!VcthiiIGHWAY AbtiJN }!JNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995

$

462

FED SHARE $ 370

GA. SHARE $

92

0TH SHARE $

PE 1993 UNDERWAY

ROW LOCL

CONST 1995

$

404

FED SHARE $

323

GA. SHARE $

Bi

0TH SHARE $

!~~: . :Jl;;G DIST. 9
/;~;; SOURcf:;
.FEDE:~ -~ii:i!i:WAY
:~:!;:
roNG
FUND SOURCE: FEDERAL TRANSIT

PE LOCL

ROW 1995

$

0

1995 $

0

FED SHARE $

GA. SHARE $

0TH SHARE $

OPERATING 1995 $

49

FED SHARE$

26

GA. SHARE$

0TH SHARE$

23

ft

,,

= =

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HABERSHA COUNTY.OPERATED PUBLIC TRANSIT SERVICE 1B1020 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE KISH STATUS:

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS

HABERSHA ONE STANDARD VAN AND ONE 1C2019 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: HABERSHAM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 19

FISCAL YEAR

COST ESTS

OPERATING 1996

$

52

FED SHARE $

28

GA. SHARE $

0TH SHARE $

24

CAPITAL 1995

$

21

FED SHARE $

17

GA. SHARE $

2

0TH SHARE $

2

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HALL 110465
STATUS:

I-985@ SR 11, NB EXIT LOOP & SB EXIT INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: J. GARLAND (M) SEND LGPA IN 1997

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 20

FISCAL YEAR

COST ESTS

PE ROW
CONST

$

20

AFTER 97

AFTER 97

HALL 110470
STATUS:

I-985@ SPOUT SPRINGS ROAD TURN LANES/ SAFETY PROJECT MILEAGE : .00 MANAGER: L. OWENS SEND LGPA IN 1997

CONG DIST. 9 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE ROW CONST

$

19

AFTER 97

AFTER 97

HALL 121590
STATUS:

SR 53 CONN FM SR 53 RECONSTRUCTION & PROJECT MILEAGE : .80 MANAGER: B FERGUSON GAINESVILLE SGN 7-28-93

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1992 UNDERWAY
CONST 1995 $ 1449 FED SHARE $ 1159 GA. SHARE $ 290 0TH SHARE $

HALL 121610
STATUS:

SR 53/MCEVER RD FM MUNDY MILL RD RECONSTRUCTION & WIDENING FROM 2 PROJECT MILEAGE : 2.50 MANAGER: L. OWENS SIGNED HALL 4/91, OAKWOOD

DIST. 9
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995

$ 6194

FED SHARE $ 4955

GA. SHARE $ 1239

0TH SHARE $

HALL 121620
STATUS:

SR 53C REL/GAINESVILLE FM SR 53C/W BYP TO SR CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

\:qQNG DI$'li}(J

PE 1992 ROW 1992

UNDERWAY UNDERWAY

PROJECT MILEAGE : .90 MANAGER: BILL MOSKAL

_ _ _1Ii_!ll:llf

DOT TO PAY ROW, UTILITIES & 100% CONST PER LETTER 5 2 91

CONST 1995 $

FUNo::Jawtr: NAT'L HIGHwAf/>

FED:e:RAt rti:GHwAY .ru:iMrn?FtiNos
12fil2o>is AN AssoctATiDPfloJEcT.

......... .
<

FED SHARE $ GA. SHARE $ 0TH SHARE $

5429 4343 1086

HALL 12167X
STATUS:

P'TREE IND BLVD FM SR 20/SUGAR HILL TO SR 347/SEE GWINNETT RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .OO MANAGER: B FERGUSON REQ COUNTY DO ROW AND UTILITIES 8-3-89.

HALL 121810
STATUS:

SR 11/US 129 FM 0.4 MIS/SR 323 TO 0.3 MIS/CR 719 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.70 MANAGER: L. OWENS REQ ~AINESVILLE PUB UTIL 1-15-91; HALL SGN 3-11-91/UTILITIES

PE 199~ UNDERWAY

:as;G DIST. 9.

ROW LOCL

T~~;~fii . . . .. !:~R~~lif!~t~k~~~N

CONST 1995 $

0

FED SHARE$

GA'. SHARE$

~: :i~, - 12167f's.:hli AssocIATED PRoiEct

0TH SHARE$ PE 1993 UNDERWAY

CONS

ROW 1993 UNDERWAY

CONST 1996 $ 3249

FUND SOURCE: NAT 1 kid~:AY

FED SHARE $ 2599

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 650

0TH SHARE $

..

=

,---,,.

~

.,

t,

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HALL 132200
STATUS:

SR 211 N/BARROW CO LINE@ MULBERRY REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: L. OWENS HALL COUNTY SIGNED 7-8-91 FOR

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

HALL 132250
STATUS:

SR 52: WB MP 11.85 TO 13.20 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.35 MANAGER: L. OWENS (M) SEND LGPA IN 1997

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 21

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY
ROW 1993 UNDERWAY CONST 1995 $ 930
FED SHARE $ 744 GA. SHARE $ 186 0TH SHARE $

PE ROW CONST

$

13

AFTER 97

AFTER 97

HALL 141810
STATUS:

SR 13/ATLANTA HWY FM RECONSTRUCTION & Tn1~M-rMri'i,,or1u
PROJECT MILEAGE : 4;90 MANAGER: J. GARLAND (M) SEND LGPA WHEN PROJECT IS

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE ROW CONST

$ 300 AFTER 97 AFTER 97

HALL 141840
STATUS:

SR 283/MT VERNON RD FM S .TURN LANES/ SAFETY PROJECT MILEAGE : 1.25 - EXIST. LANES: MANAGER: L. OWENS REV REQ HALL DO ROW & UTIL 2-9-94;REQ

DIST. 9
SOURCE: HWY. SAFETY HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW LOCL

CONST 1996

$

631

FED SHARE$

568

GA. SHARE$

63

0TH SHARE$

HALL 150140
STATUS:

SR 13/PEACHTREE RD@ SOUTHERN RR

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

}:/}:t;~~G

PROJECT MILEAGE : .40

.{}C'{i}''

MANAGER: L. OWENS

NO UTILITIES INVOLVED PER DISTRICT 8/89

BRIDGE PROGID F Ab~rn Jwips

PE 1985 UNDERWAY

ROW 1987 UNDERWAY

CONST 1996 $ 1160

FED SHARE $ 928

GA. SHARE $

232

0TH SHARE $

HALL 150200
STATUS:

SR 53 FM SR 369/BROWNS BRIDGE RD TO SR 53 CONN RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.10 MANAGER: BILL MOSKAL SEND LGPA IN 1996

souRc/ itikAcE TRANSPoii:ii >
FEDERAL FIIGH#AY ADMIN

PE 1993 ROW 1996
/ toNsT

UNDERWAY $ 1389 AFTER 97.

HALL 170536
STATUS:

CR 928/WHITEHALL RD@ NORTH OCONEE RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. PROJECT MILEAGE: .00 MANAGER: L. OWENS HALL COUNTY SIGNED 4-25-88 FOR'ROW AND UTILITIES

CO~G DIST.\~
FUND SOURCE: BRIDd~:iti~RAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW LOCL

CONST 1996 $

93

FED SHARE$

74

GA. SHARE$

19

0TH SHARE$

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HALL 170730

LAKE LANIER ACCESS. RD FM I-985/SR 365 TC>.. SHORELAND DR/CR 592

CONSTRUCTION OF NEW ROUTE WITH 4 LANES Pi'i.OPOSED.

PROJECT MILEAGE : 2 .10

.

.:,.,..

STATUS: ~t~~R~/~~~~~o:UFORD 6/89 UTIL;GA_~-~ifvi~ .7/93 P UTIL.

HALL

To::: II LAKE LANIER ACCESS RD FM I-985

(PH

~\~S 3 & 4)

170735 RECONSTRUCTION & WIDENING FROM/f t,AAES TO 4 LANES.

qdi; ~gi PROJECT MILEAGE : 3. 80
STATUS: : =tG~~~ ti~~~~sg~IL;

/ 6-20-89

CONG DIST, 9 FUND SOURCE: LAKE ACCESS PROGRAM FEDERAL.HIGHWAY ADMIN FUNDS 170730 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FUND SOURCE: LAKE ACCESS PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 22

FISCAL YEAR

COST ESTS

PE 1986 UNDERWAY

ROW 1987 UNDERWAY

CONST 1995

$ 1770

FED SHARE $ 1682

GA. SHARE $

89

0TH SHARE $

PE 1994

$

ROW 1994

$

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

85 2000 2916 2770
146

HALL

CITY OF GAINESVILLE-Btkf/#EDSTRIAN PATHS TO INTERc&tii2T

171030 BICYCLE/PED. FACILITY f' ENHANCEMENT
PROJECT MILEAGE : . oo - EkfsT. LANES: o /PROPQSEP tlilits: o

MANAGER: T. LONG

STATUS: LGPA TO BE DONE BY CONTRACT

CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996

$

500

FED SHARE $

400

GA. SHARE $

0TH SHARE $ 100

HALL 171060
STATUS:

RESTORE FLOWERY BRANCH RAILROAD DEPOT MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: T. LONG LGPA TO BE DONE BY CONTRACT

DIST. 9
SOURCE: TRANS. ENHANCE.
f :r-.; \ .F-.-.-E.-.-,D-..E.R.-A-L..:-....HIGHWAY ADMIN FUNDS

HALL 171090
STATUS:

RENOVATION OF GAINESVILLE DEPOT
ors! Ii MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT

............... :\GONG

6 PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED

:: >: Jaw2r r/ MANAGER: T. LONG

LANES:

FU~;

TRANS. ENHANCE

'LGPA TO BE DONE BY CONTRACT

FEDERAJ}:HfoHWAY ADMIN,

PE LOCL

ROW NONE

$

0

CONST.1997

$

250

. FED SHARE $ 200

GA. SHARE $

0TH SHARE $

50

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

295

FED SHARE $ 236

GA. SHARE $

0TH SHARE $

59

HALL 1B1024
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FONDS RECIPIENT: HALL MANAGER: STEVE KISH

/)\CONG DIST. 9 .cc'c':,:,:,,.cc-,, ,.
FUND souRc:iT'@fu
FEDERAL ,".rru'illSIT ADMIN

1995

$

185

FED SHARE$

105

GA. SHARE$

0TH SHARE$

80

HALL 1B1025
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HALL MANAGER: STEVE KISH

CONG DIST. '\9
FUND SOURCE: FEDERAL TRANSIT

OPERATING 1996

$

194

FED SHARE$

111

GA. SHARE$

0TH SHARE$

84

"

"

..

,,

r.-- ........

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HALL 1C2024
STATUS:

ONE STANDARD VAN AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HALL MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

HALL 1C2025
STATUS:

ONE STANDARD VAN AND ONE
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HALL MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 23

FISCAL YEAR

COST ESTS

CAPITAL 1995

$

21

FED SHARE $

17

GA, SHARE $

2

0TH SHARE $

2

CAPITAL 1996

$

21

FED SHARE $

17

GA. SHARE $

2

0TH SHARE $

2

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HART 11051X
STATUS:

I-85 SB WELCOME CENTER; SEE FRANKLIN REST AREA/ RECST. OR REHAB, PROJECT MILEAGE 1.00 - EXIST. LANES: MANAGER:

CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 24

FISCAL YEAR

COST ESTS

PE 1995

$

0

ROW 1994

$

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

HART 132150
STATUS:

SR 77-FM SR 77 C TO SR
MINOR WIDEN & RESURF / PROJECT MILEAGE : 4.83 MANAGER: L. OWENS HART COUNTY SGN 1-12-93

PE 1993 UNDERWAY

CONG DIST, 10

ROW 1993 UNDERWAY

3

CONST 1996 $ 1236

FUND SOURCE: SURFACE TRANSPORT,

FED SHARE $

989

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 247

0TH SHARE $

HART 132160
STATUS:

SR 77 FM SR 51 TO SR ADDITION OF A PASSING PROJECT MILEAGE : 5.20 MANAGER: L. OWENS HART COUNTY SGN 1-12-93

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

233'

CONST 1996 $ 2271

FED SHARE $ 1817

GA. SHARE $ 454

0TH SHARE $

HART 141850
STATUS:

SR 51 AT CR 503 AND CR 405 TURN LANES/ SAFETY PROJECT MILEAGE: ,00 - EXIST. MANAGER: L. OWENS CONTACT TRAFFIC OPERATIONS

DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1996 $

58

FED SHARE $

52

GA. SHARE $

6

0TH SHARE $

HART 170842
STATUS:

CR 240/GRIFFIN RD OVER LITTLE SHOAL CK NE OF REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .00 MANAGER: L. OWENS
HART SIGNED 4-9-92 FOR ROW, UTILITIES AND DETOURS.

/CONG Dis.il Ho > UNO'. 18\JkH:: BRIDGE PROGfuUl
)HIGHWAY ADMIN.,ftiNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 225

FED SHARE $ 180

GA. SHARE $

45

0TH SHARE $

HART 170843
STATUS:

CR 245@ SHOAL CREEK 6.5 MI NE OF BOWERSVILLE REPLACEMENT OF JHE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE: .22 MANAGER: L. OWENS HART SGN 10-18-93 FOR ROW, UTILITIES & DETOURS

f ) ::!: i~b:G DIST. 10

FUND sou~e;::ji:~RIDGE PROGRAM

FEDERAL_.,-1tlGHWAY ADMIN

_ ,,_,,,,,.,,_,,_, ,,,,_.-

.....,--...::::::<:::?'

PE 1994

UNDERWAY

ROW LOCL

1997 $ 363

FED SHARE $ 290

GA. SHARE $

73

0TH SHARE $

HART 171080
STATUS:

CITY OF HARTWELL COURTHOUSE SQUARE SIDEWALKS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT _

CONG DIST. ':,10
FUND SOURCE: FEDERAL HIGHWAY

PE LOCL

Row NONE $'

0

CONST 1995 $

21

FED SHARE $

17

GA. SHARE $

0TH SHARE $

4



,,

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HART 1Bl029
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HART MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

HART 1Bl030
STATUS:

COUNTY OPERATED PUBLIC TRANSIT FACILITIES/ FONDS RECIPIENT: HART MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 25

FISCAL YEAR

COST ESTS

OPERATING 1995

$

38

FED SHARE$

20

GA. SHARE$

0TH SHARE$

18

.OPERATING 1996

$

41

FED SHARE$

22

GA. SHARE $

0TH SHARE$

19

GEORGIA DEPARTMENT OF TRANSPORTATION

"L.L-~eo-J.:1:1 ..

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 26

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------------------------------------------------------------------------------------------------------------------------

JACKSON SR 11/US 129 FM E/MIDDLE OCONEE RVR TO i:):R 236/INCL I-85 BR

PE 1992

UNDERWAY

110250 STATUS:

RECONSTRUCTION & WIDENING FROM 2 LANES T6:,4 LANES.

PROJECT MILEAGE : 4 5

,,,,,,,,,, ..

~:;~:= itif S~NG~~~A~i~iRSON REFUSED 9/J?/:

DIST LTR 10/92

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

ROW 1995

$

CONST 1997

$

FED SHARE $

GA. SHARE $

1152 4221 3377
844

0TH SHARE $

JACKSON 11044Z
STATUS:

I-85 SIGN MOD FM DEK CL TO SC SIGNING/ MAINTENANCE PROJECT MILEAGE: 76.00 MANAGER: L. SEABROOK

JACKSON 121604
STATUS:

t:: SR 11 FM PROP . JEFF~:~:8*ii~~ W TO s CITY LIMITS p

:::ilA.ss

RECONSTRUCTION & WIDENING/FROM 2 LANES TO 4

~:;~:= PROJECT MILEAGE : 2 . 40 . . . S~NG~~~wt;n~~) CITY :~titJSEP 9/92; sit bfsT iTR 19/92 ....:::-:--.: ...,,..-..c--

CONG DIST. 10 & 6 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 110440 Is-AN ASSOCIATED PROJECT.
CONG DIST. 10 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

PE 1992

UNDERWAY

ROW 1995 $ 3190

CONST 1997

$ 3971

FED SHARE $ 3177

GA. SHARE $ 794

0TH SHARE $

JACKSON 122400
STATUS:

SR 53 NEAR HOSCHTON NB FM MP 6.8-8.4 ADDITION OF A PASSING LANE. PROJECT MILEAGE: 1.60 MANAGER: L. OWENS {M) SEND LGPA WHEN PROJECT IS ADDED TO CWP

:::= HoNG DIST. 10
; FUND SOURCE: SURFACE TRANSPORT. ,FEDERAL HIGHWAY ADMIN FUNDS

"\\:.}=}:)?'

=:t

JACKSON 122510
STATUS:

SR 15 ALT REHAB. OF

IN JEFFERSON THE EXISTING

BATRIDBGIGE {CSU) R. RYFROCMREE2KLANES

TO

3

LANES{:C:C::',,,.... :_,-,',',,,,_-,_.CONG

DIST_,_:,-.,-: }:,-,f. o

PROJECT MILEAGE : .00 MANAGER: L. OWENS

;:b ~6Bit&k\ BRIDGE PROG~::>=

SEND LGPA IN 1996

FEDElli jfi:GHWAY AD!:1IN FUNDS

PE ROW CONST

$

9

AFTER 97

-AFTER 97

PE 1993 ROW 1997 CONST

UNDERWAY

$

20

AFTER 97 .

JACKSON 132070
STATUS:

SR 335 W/NICHOLSON@ NORTH OCONEE RIVER REPLACEMENT OF THE EXISTING BRIDGES{S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER:: L. OWENS JACKSON COUNTY SGN 6-3-92 FOR UTILITIES.

JACKSON 171000
STATUS:

CR 184@ WALNUT CREEK 4 MI NORTH OF BRASELTON REPLACEMENT OF THE EXISTING BRIDGES (S) . NO ADDED LANES.
PROJECT MILEAGE : .20 MANAGER:L. OWENS JACKSON SGN 10-18-93 ROW, UTILTIES & DETOURS

::;15:G DIST. 10: :::: \ / /
FUND souRcfi BRIDGE PROGRAM FEDERAL l!IGitWAY ADMIN
CON~',: ~~: ~
FUND SOURCE: FEDERAL HIGHWAY

PE 1989 UNDERWAY

ROW 1994

UNDERWAY

1995 $ 800

FED SHARE $

640

GA. SHARE $ 160

0TH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1997 $ 186

FED SHARE$ 149

GA. SHARE$

37

0TH SHARE$

=

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

JACKSON 171001
STATUS:

CR 269@ CANDLER CREEK 8.5 MI NE OF REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .20 MANAGER: L.OWENS JACKSON SGN 10-18-93

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 27

FISCAL YEAR

COST ESTS

PE 1994 UNDERWAY

ROW LOCL

CONST 1997

$

630

FED SHARE $ 504

GA. SHARE $ 126

0TH SHARE $

JACKSON 171002
STATUS:

CR 367/WHITES BOTTOM ROAD@
REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .20 MANAGER: L.OWENS JACKSON SGN 10-18-93

& DETOURS

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW LOCL

CONST 1997 $ 223

FED SHARE $ 179

GA. SHARE $

45

0TH SHARE $

JACKSON 171070 STATUS:

HISTORIC JACKSON CO.

LANDSCAPING/

r~,~~,~~

PROJECT MILEAGE : .00 -

MANAGER: JANET HARVEY

LGPA TO BE DONE BY CONTRACT

CONG DIST. 10
0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1997 $ 179

FED SHARE $ 143

GA. SHARE $

0TH SHARE $

36

JACKSON 171100
STATUS:

DOWNTOWN COMMERCE STREETSCAPE & PRESERVATION BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE, : . 00 - EXIST. LANES: 0 MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT

SOURCE: TRANS. ENHANCE.

.. :\

ADMIN FUNDS

PE LOCL

ROW NONE $

0

CONST 1997 $ 363

FED SHARE $ 290

GA. SHARE $

0TH SHARE $

73

JACKSON 1Bl079
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISH

Disfj '.1o

;:~=:iB&k8k1 ; RURAL TRANS!

" .OPERATING 1995 $ FED SHARE$

25 14

FEDiiW:.iRANsIT AriMm:tuNos

GA. SHARE$

0TH SHARE$

11

JACKSON 1B1080
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JACKSON MANAGER: STEVE KISH

FUND SOURci; iliHw. TRANSIT
FEDERAL ,-TAAN'SIT ADMIN

1996 $

26

SHARE$

15

GA. SHARE$

0TH SHARE$

11

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

LUMPKIN 122370
STATUS:

SR 52 WB BETWN CR 190 & CR 253 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.60 MANAGER: L. OWENS SEND LGPA IN 1995

CONG DIST. 9
FOND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 28

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1996

$

20

CONST 1997

$

667

FED SHARE $ 534

GA. SHARE $ 133

0TH SHARE $

LUMPKIN CR 213 OVER WATERS/DICKS 170900 BRIDGES/ REPLACEMENT
PROJECT MILEAGE : .. 00 MANAGER: L. OWENS STATUS: LUMPKIN SGN 3-19-92

CONG DIST . 9
FOND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FONDS

PE 1993 .UNDERWAY

ROW LOCL-

CONST 1~96 $ 110

FED.SHARE$

110

GA. sHARE $

0TH SHARE$

LUMPKIN 170910
STATUS:

BRIDGE REPLACEMENT BRIDGES/ REPLACEMENT PROJECT MILEAGE : . 00
MANAGER: L. OWENS LUMPKIN COUNTY SGN FOR

CONG DIST. 9
FOND SOURCE: FED. LANDS . FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE $

. 0

CONST 1995 . $ 462

FED SHARE$ 462

GA. SHARE$

0TH SHARE$

LUMPKIN 1Bl034
STATUS:

'COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FONDS RECIPIENT: LUMPKIN MANAGER: STEVE_ KISH

DIST. 9

FOND SOURCE: RURAL TRANSIT

OPERATING 1995 $

31

. FED SHARE $

19

]fE[))!:~ T~SIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

12

LUMPKIN 1Bl035
STAT.US:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS-RECIPIENT: LUMPKIN MANAGER: STEVE KISH

i 9
RURAL TRANsf4j:: J>PERATIN;Et !!ARE

33 20

Al'.>MIN FtiNOS

GA. SHARE $

0TH SHARE$

13

LUMPKIN 1C2Q34
STATUS:

ONE CONVERSION VAN WITH.LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LUMPKIN MANAGER: STEVE KISH,
-LGPA NOT APPLICABLE

1995

$

32.

FED SHARE$

26

GA. SHARE$

3

0TH SHARE$

3

,,

"""""""'

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MADISON 122185
STATUS:

SR 8/US 29@ BRUSH CRK & S. FORK BROAD REHAB. OF THE EXISTING BRIDGE(S). FROM PROJECT MILEAGE : .00 MANAGER: B FERGUSON (M) LGPA WILL BE SENT WHEN FR-003-3(47)

TO 4 LANES.

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MADISON 170786
STATUS:

CR 37@ MASONS MILL CREEK 5 MI REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .20 MANAGER: L. OWENS MADISON SGN 10-15-93

CONG DIST. 10
FOND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 29

FISCAL YEAR

COST ESTS

PE 1995 $

ROW NONE $

CONST 1997

$

FED SHARE$

GA. SHARE$

0TH SHARE$

20
0
1118 894 224

PE 1994 UNDERWAY

ROW LOCL

CONST 1996 $ 230

FED SHARE$

184

GA. SHARE$

46

0TH SHARE$

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

OCONEE 12257X
STATUS:

SR 10/US 7B MONROE TO UNKNOWN / UNKNOWN PROJECT MILEAGE : .00 MANAGER: UNKNOWN

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997

COMMENTS

WALTON LANES: 0

CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

OCONEE 141970
STATUS:

SIMONTON BRIDGE RD FM US 441 MINOR WIDEN & RESURF / RECST. PROJECT MILEAGE : 2.50 MANAGER: L. OWENS

CONG DIST. 10 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 30

FISCAL YEAR

COST ESTS

PE 1994

$

0

ROW NONE

$

0

CONST 1997

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE ROW LOCL CONST

$

20

AFTER 97

OCONEE 1419B0
STATUS:

MARS HILL RD/CR 263 MINOR WIDEN & RESURF / PROJECT MILEAGE : 3.BO MANAGER: L. OWENS

CONG DIST. 10 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

OCONEE 150210
STATUS:

.-::;
CR 473/EPPS BRIDGE RD FM SR 10 TO SR lOBUS/US 7B/c!..Afil& RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.,,,/{':,,,,,.:. _.. PROJECT MILEAGE : 3.30 MANAGER: B FERGUSON (C) OCONEE SGN 5/92;CLARKE REFUSED

} 'ATHENS TIP ft II-03 :)',CONG DIST. 10
::UNO SOURCE: NAT'L HIGHWAY
ct$2Isls FEDERAL HIGHWAY ADMIN FUNDS AN ASSOCIATED PROJECT.

PE ROW LOCL CONST

$

20

AFTER 97

PE 1992

UNDERWAY

ROW 1995 $ 2700

CONST 1996

$ 10373

FED SHARE $ B29B

GA. SHARE $

22B

0TH SHARE $ 1B47

OCONEE 150215
STATUS:
OCONEE 171145
STATUS:

EPPS BRIDGE RD @ MCNUTT CRK/ALSO CLARKE co

.. : ,,,,,.. ATHENS T::i:i1:il II-03

PE 1993 UNDERWAY

REHAB. OF THE EXISTING BRIDGE (S). FROM 2 LANES TO 4 LANES( :,,:::,:::::/?CONG DIST.{:'"10

ROW NONE

$

0

~~i!:M!L:~~~u~o/~c)

FUN~J8Jkhi: BRIDGE PROG~ { .

9 CONSiE~ :!ARE

~

~i;

SEE 150210
ELDER'S MILL COVERED BRIDGE ON CR 129 OVER ROSE CREEK BRIDGES /-ENHANCEMENT PROJECT MILEAGE: .00 MANAGER:.UNKNOWN

FEDE!lKi HIGHWAY ADMIN FUNDS

GA. SHARE $

179

1so2fo is AN Associ:il.TED PROJECT. > ::

OTH SHARE $

:,.T. *~~. .~~ =~=~ 11)1id!:m:G; ,o<twl!IJJI:t' 1 SOURc~'i

~ ENHANCE.-:,:,:/::C:,:-:/:::::::c c:misFTE~ 9!~ARE

:
:~

DOT WILL PROVIDE THE 20% MATCH

FEDE~,.Jil:GHWAY ADMIN

GA. SHARE$

17

0TH SHARE$

. ,.
I

"""""""' """""""'

t,.,_..._oJ.:.,..~l

~

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE .TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

RABUN 121950
STATUS:

SR 2 ACROSS DAVIS GAP/EB MP ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.32 MANAGER: L. OWENS DOT WILL PAY UTILITIES 11-10-92

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 31

FISCAL YEAR

COST ESTS

PE 1993 ROW 1997 CONST

UNDERWAY

$

242

AFTER 97

RABUN 171040
STATUS:

TALLULAH GORGE
BICYCLE/PED. FA PROJECT MILEAGE MANAGER: JANET LGPA TO BE DONE

RABUN 1B1039
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: RABUN MANAGER: STEVE KISH.

RABUN 1B1040
STATUS:-

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: RABUN MANAGER: STEVE KISH

CONG DIST. 9
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW 1995 $

14

CONST 1995

$

708

FED SHARE$

566

GA. SHARE$

3

0TH SHARE$

145

CONG DIST, 9

OPERATING 1995 $

17

FUND SOURCE: RURAL TRANSIT

FED SHARE$

10

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

7

OPERATING 1996 $

18

SOURCE: RURAL TRANSIT

F_ED SHARE $.

10

TRANSIT ADMIN FUNDS

GA. SHARE$

. 0TH SHARE $

8

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION. IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

STEPHENS CR 146/RIVERDALE RD OVER WALTON CREEK NE .. OF TOCCOA

170832 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .00

MANAGER: L. OWENS

STATUS: STEPHENS COUNTY SIGNED 4-7-92 FOR ROW:{

& DETOURS

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

1

STEPHENS CR 16/YOW MILL ROAD @ EASTANOLLEE9::tlif 1. 9 MI N 6#:\AVALON

170833 REPLACEMENT OF THE EXISTING BRii:iGES(Si. NO ADDED LANES.

PROJECT MILEAGE : .20



MANAGER: L. OWENS

. ,,,,.,,,,,.:,;,,:,:,/c:c:,;.:c

STATUS: STEPHENS SGN DO ROW, UTif'.J<:r.:g:f& DETOURS 10-19-93

STEPHENS !i~~=~uf~.:!;~tJiF~!~~c~.:ccoA
171050

.\i?

MPRAONJAEGCETR: MJIALENAEGTEHA: RV.0EY0 - EX.I..ST.. . LANES: 0 /PROPOS...J..!.:.O...L...A...N. ES: 0

STATUS: LGPA TO BE DONE BY CONTRACT

CONG DIST. 9 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

22"".Feb-1994 Page 32

FISCAL YEAR

COST ESTS

PE 1993

UNDERWAY

ROW LOCL

CONST 1995

$

354

FED SHARE$

283

GA. SHARE$

71

0TH SHARE$

PE 1994

UNDERWAY

ROW LOCL

CONST 1996

$

218

FED SHARE $

174

GA. SHARE $

44

0TH SHARE $

PE LOCL

ROW NONE

$

0

CONST 1996

$

616

FED SHARE$

493

GA. SHARE$

77

0TH SHARE$

200

-

- """""""

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TOWNS 122230
STATUS:

SR 2/US 76 3 MILES SE/HIAWASSEE@ REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: L. OWENS (M) SEND LGPA WHEN PROJECT IS ADDED TO

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TOWNS 122420
STATUS:

SR 2/US 76 FM CR 3 TO SR 17 RECONSTRUCTION & WIDENING PROJECT MILEAGE : 1.50
MANAGER: L. OWENS SEND LGPA WHEN PROJECT

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

TOWNS 141960
STATUS:

SR 180 SP, BRASSTOWN RIDING SURFACE PROJECT MILEAGE : MANAGER:~. OWENS NOT APPLICABLE

ETC.CONG DIST. 9
FUND SOURCE: FED. LANDS FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 33

FISCAL YEAR

COST ESTS

PE ROW CONST

$

17

AFTER 97

AFTER 97

PE ROW CONST

$

28

AFTER 97

AFTER 97

PE NONE $

0

ROW NONE $

0

CONST 1995

$

138

FED SHARE$

110

GA. SHARE$

28

0TH SHARE$

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

UNION 170870
STATUS:

CR 1/PAT COLWELL RD OVER NOTTERLY REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: L. OWENS COUNTY SIGNED 7-27-92 ROW, UTILITIES

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

UNION 170871
STATUS:

cR 1/PAT COLWELL RD OVER YOUNGC.Nl.ll:/CREEK REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: L. OWENS COUNTY SGN ROW,

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 34

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY
ROW LOCL CONST 1996 $ 1254
FED SHARE$ 1003 GA. SHARE$ 251 0TH SHARE$

PE 1993 UNDERWAY ROW LOCL CONST 1996 $ 782
FED SHARE$ 626 GA. SHARE$ 156 0TH SHARE$

"

tt

~

.,

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 35

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA -

COMMENTS

--------------------------------------------------------------------------------------------

----------------------Y-E-A-R --------E-S-T-S --

WALTON SR 124 CONN/SR 890 FM SR 500 TO SR

PE

$ 1500

122365 CONSTRUCTION OF NEW ROUTE WITH 4 LANES

CONG DIST. 10

ROW

AFTER 97

PROJECT MILEAGE : 5.10

CONST

AFTER 97 -

MANAGER: BILL MOSKAL

FUND SOURCE: NAT'L HIGHWAY

STATUS: REQ WALTON COUNTY DO UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

WALTON 12236Z
STATUS:

SR 124, CONN/SR 890 FM SR 124 CONSTRUCTION OF NEW ROUTE PROJECT MILEAGE : 6.30 MANAGER: BILL MOSKAL

WALTON 122560
STATUS:

SR 81 AT MONROE TURN LANES/ SAFETY PROJECT MILEAGE : .00 MANAGER: L. OWENS CONTACT TRAFFIC OPERATIONS

WALTON 122570
STATUS:

SR 10/US 78 MONROE TO ATHENS MEDIAN OPENINGS MEDIAN WORK/ SAFETY PROJECT MILEAGE : 16.00 - EXIST. LANES: 4 MANAGER: NOT APPLICABLE

WALTON 1Bl049
STATUS:

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF SOCIAL CIRCLE MANAGER: STEVE KISH

WALTON 1Bl050
STATUS:

CITY OPERATED PUBLIC TRANSIT ,SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF SOCIAL CIRCLE MANAGER: STEVE KISH

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 122365 IS AN ASSOCIATED PROJECT.

PE ROW
CONST

$

0

AFTER 97

AFTER 97

CONG DIST. 10
0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW 1995

$

1

CONST 1996

$

109

FED SHARE $

98

GA. SHARE $

11

0TH SHARE $

DIST. 10
SOURCE: HWY. SAFETY ~~u~=~ HIGHWAY ADMIN FUNDS

PE 1994

$

ROW NONE $

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

10 0
1155 924 231

RURAL, TRAN.stfij:'.'} .. OPERATIN;E; 9;~ARE' ~

29 17

ABMrn<F.UNDs

GA. sHARE $

0TH SHARE$

12

sooRciit\k&~ TRANSIT 'FEbERAL,'rrou{slT ADMIN

1996 $

30

FED SHARE$

18

GA. SHARE$

0TH SHARE$

12

GEORGIA DEPARTMENT OF TRANSPORTATION

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 36

PROJECT LISTING BY COUNTY FY 1995/FY-1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-------------. -------------------------------------------------------------------------------------------------------------~-------

WHITE SR 75 FM SR 75 ALT/CLEVELAND NE TO CR

PE

$

33

122130 RECONSTRUCTION & WIDENING FROM 2 LANES

CONG DIST. 9

ROW

AFTER 97

PROJECT MILEAGE: 2.23

CONST

AFTER 97

MANAGER: L. OWENS(M)

..

FUND SOURCE: SURFACE TRANSPORT.

STATUS: REQ CLEVELAND DO UTIL 9-30-91; ~~Tft,mv

FEDERAL HIGHWAY ADMIN FUNDS

WHITE 141830
STATUS:

SR 384/DUNCAN BRIDGE RD FM W ADDITION OF A PASSING LANE. PROJECT MILEAGE: 7.32 MANAGER: L. OWENS (M)
SEND LGPA WHEN PROJECT, . /i(f'.i(i(,)1:/:0YTO

WHITE 162390
STATUS:

CLEVELAND WEST BYP
CONSTRUCTION OF NEW PROJECT MILEAGE: 1.80 MANAGER: J. GARLAND (M) SEND LGPA WHEN PROJECT IS .,...,v~,~,,.~~

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE
ROW CONST

$

140

AFTER 97

~TER 97

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE .1996 ROW LOCL CONST

$

90

AFTER 97

WHITE 170881
STATUS:

CS 613/LORELY RD OVER CHATTAHOOCHEE RIVER IN REPLACEMENT OF THE EXISTING BRIDGES(S). FROM PROJECT MILEAGE : .19 MANAGER: L. OWENS WHITE REFUSED 5-17-92; HELEN SGN 3-4-93

~ONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

WHITE. 171020
STATUS:

o]I :~~~~t:~c;~,~~E; i=~~:-0. REHAB, ilANosCAPING ::::

PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES: {i):i)/(?
MANAGER: JANET HARVEY ~GPA TO BE DONE BY CONTRACT

.c.. ''

'::.

FUNoiowct: TRANS. ENHAildL

::tt'I:GHWAY ADMIN)tui-ios

WHITE 171155
STATUS:

STOVALL MILL COVERED BR OVER CHICKAMAUGA CK ADJACENT-SR 255
BRIDGES/ ENHANCEMENT PROJECT MILEAGE: .00 MANAGER: UNKNOWN DOT ~ILL PROVIDE THE 20% MATCH

FUND SOUR~j':} ~.AANS . ENHANCE. FEDERAL ,.JttGHi'lAY ADMIN

PE 1993 UNDERWAY

ROW LOCL

CONST 1997 $ 306

FED SHARE$ 245

GA. SHARE$

61

0TH SHARE$

PE

$

20

ROW 1997 $ 250

CONST 1997 $ 442

FED SHARE$ 354

GA. SHARE$

54

0TH SHARE$ 142

PE NONE $

0

ROW NONE

$

0

1995 . $

47

FED SHARE$

38

GA. SHARE$

9

0TH SHARE$

= =

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997.
COMMENTS

BALDWIN 222180
STATUS:

SR 22/24 RELOC FM CR 171 EAST TO SR 22/:1~ SPLIT CONSTRUCTION OF NEW ROUTE WITH 4 LANES PijQPOSED. PROJECT MILEAGE: 3.10 MANAGER: B FERGUSON (M)SEND LGPA IN 1997

CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

BALDWIN 241670
STATUS:

BALDWIN 242290
STATUS:

@'tkWt CR 470/PANCRAS ROAD

CREEK 6 MI SW OF MILLEti!iYii~E

REPLACEMENT OF THE EXIST.J:ijG BRIDGES (S) NO ADDED,/LANES\

PROJECT MILEAGE : .21

- .:::::.::::::

MANAGER: D. GRIFFITH (M) SEND LGPA IN 1995

CONG DIST. 11 GRIP PROJECT FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

BALDWIN 270950
STATUS:

PRESERVATION OF HISTORIC DISTRICT IN MILLEDGEVILLE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0
MANAGER: C. HAMILTON LGPA TO BE DONE BY CONTRACT

DIST. 11
SOURCE: TRANS. ENHANCE. HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 1

FISCAL YEAR

COST ESTS

PE 1995 ROW 1997
CONST

$

168

$ 2272

AFTER 97

PE 1993

UNDERWAY

ROW 1994

$

2

CONST 1995

$

142

FED SHARE $

128

GA. SHARE $

14

0TH SHARE $

PE 1995

$

11

ROW LOCL

CONST 1997

$

550

FED SHARE $

440

GA. SHARE $

110

0TH SHARE $

PE 1995 $

21

ROW 1995

$

44

CONST 1995

$

74

FED SHARE $

59

GA. SHARE $

13

0TH SHARE $

28

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
. COMMENTS

BLECKLEY SR 87/US 23 IN COCHRAN@ SOUTHERN RR 221130 REPLACEMENT OF THE EXISTING BRIDGES($).
PROJECT MILEAGE: .30 MANAGER: D. GRIFFITH
STATUS: LGPA SIGNED BY CITY 3-13-85

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

BLECKLEY SR 87 FM SR 112 TO SR 96 IN 222070 RECONSTRUCTION & WIDENING
PROJECT MILEAGE: 8.00 MANAGER: B FERGUSON (M)
STATUS: BLECKLEY SGN 4/91 UTIL;

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 2

FISCAL YEAR

COST ESTS

PE 1985 UNDERWAY

ROW 1988 UNDERWAY

CONST 1995

$ 1006

FED SHARE $

805

GA. SHARE $

201

OTS SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY $ 494 AFTER 97

BLECKLEY SR 87 FM SR 257 NW 222360 RECONSTRUCTION &
PROJECT MILEAGE: 2.50 MANAGER: B FERGUSON (M) STATUS: SEND LGPA WHEN PROJECT IS

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW CONST

$

90

AFTER 97

AFTER 97

BLECKLEY SR 112 : OVER BOLLINGER CREEK 242160 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE: .00
MANAGER: D. GRIFFITH (M)
STATUS: SEND LGPA IN 1996

DIST, 8
FUND SOURCE: BRIDGE PROGRAM F.li:.DERAL. HIGHWAY ADMIN FUNDS

PE 1995
ROW 1997 CONST.

$

10

$

1

AFTER 97

BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl089 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH . STATUS:
BLECKLEY COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl090 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH STATUS:
BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2089 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

; 1:~i: DIST. 8. }
FUND SOURcfr~~~ TRANSIT
rED!i:~ f~siT ADMIN
CONG::!~::
FUND SOURCE: FEDERAL TRANSIT

22

1996

$

58

FED SHARE$

34

GA. SHARE$

0TH SHARE$

24

CAPITAL 1995

$

21

FED SHARE$

17

GA. SHARE$

2

. 0TH SHARE $

2

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BLECKLEY ONE STANDARD VAN AND ONE MOBILE RADIO 2C2090 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: BLECKLEY MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 3

FISCAL YEAR

COST ESTS

CAPITAL 1996

$

21

FE.D SHARE $

17

GA. SHARE$

2

0TH SHARE$

2

GEORGIA DEPARTMENT OF TRANSPORTATION

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 4

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

B-UP-R-.IK-.E-N-O--. -S-R--1-2-1-/-U-S--2-5---PF-MR-O-CJ-ER-C-T1-6-D-AT-OT-A-C-R--1-1-8-/-S-E-E----=-1u-~-,-,~-~----------------------------C-O-M-M--E-N-TS---------------------------PE-Y-EA-1-R9-9-4-----U-NE-DS-ETR-SW--AY

22255X UNKNOWN/ UNKNOWN

CONG DIST. 11

ROW 1996

$

0

PROJECT MILEAGE: .00 - EXIST. LANES: 0

GRIP PROJECT

CONST

AFTER 97

MANAGER:

FUND SOURCE: GOVERNOR'S RD IMP PROGRAM

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

BURKE 231260
STATUS:

SR 24 WB MP 22-23.3/EB24.3-25. ADDITION OF A PASSING LANE. PROJECT MILEAGE : 5.40 MANAGER: D. GRIFFITH (M) SEND LGPA WHEN PROJECT

CONG DIST. 11
FUND SOURCE: S_URFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE ROW CONST

$

81

AFTER 97

AFTER 97

BURKE 23156X
STATUS:

SR 78/US 319 FM SR
RIDING SURFACE PROJECT MILEAGE : 14.20 MANAGER: L. SEABROOK

BURKE 2Bl094
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH

BURKE 2Bl095
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE

TRANSIT FACILITIES/ OPERATIONS

.

FUNDS RECIPIENT: BURKE

MANAGER: STEVE KISH

BURKE 2C2094
STATUS:

TWO STANDARD VANS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH LGPA NOT APPLICABLE

BURKE 2C2095
_STATUS:

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BURKE MANAGER: STEVE KISH LGPA NOT APPLICABLE

PE NONE $

0

ETC.CONG DIST. 11

ROW NONE

$

0

CONST 1995 $

0

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

DIST. 11

OPERATING 1995

$

71

FUND SOURCE: RURAL TRANSIT

FED SHARE$

42

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE$

29

i!i !:i:!;~G

'<;iffi; ~J~ SOURcti

TRANSIT

FEDERAL.TRANSIT ADMIN

CONG DIST. ':::11
FUND SOURCE: FEDERAL

75 44
31

1995

$

40

FED SHARE$

32

GA. SHARE$

4

0TH SHARE$

4

CAPITALl996

$

32

FED SHARE$

:--26

GA. SHARE$

3

0TH SHARE$

3

---=

=

Q1S.C..Tt!1il

~

,---,..,

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COLUMBIA I-20@ WHEELER RD/SEE RICHMOND CO 21049X INTERCHANGE/ NEW CONSTRUCTION
PROJECT MILEAGE : .00 - EXIST .. LANES: MANAGER: NEIL DAVIS STATUS:

LANES: 0

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 210490 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 5

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

COLUMBIA I-20 REST AREA #62 & 63 210565 REST AREA/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: J. GARLAND (C) STATUS: COLUMBIS COUNTY SIGNED

CONG DIST. 10
0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW NONE

$

0

CONST 1997

$ 1681

FED SHARE $ 1513

GA. SHARE $

168

0TH SHARE $

COLUMBIA SR 232 WB MP 2.5-3.6; 221410 ADDITION OF A PASSING
PROJECT MILEAGE : 2.40 MANAGER: D. GRIFFITH STATUS: CO SGN UTIL 4-4-91; PROJECT

AUGUSTA TIP# GI006 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$ 2800

FED SHARE $ 2240

GA. SHARE $

560

0TH SHARE $

COLUMBIA SR 104 FM MP 8.95 S OF CR 221805 RECONSTRUCTION & WIDENING
PROJECT MILEAGE : 3.00 MANAGER: B FERGUSON STATUS: COLUMBIA COUNTY SGN FOR UTILITIES

AUGUSTA TIP# CC-076

fONG DIST. 10

'.:/)(t:'.

.

FUND SOURCE: SURFACE TRANSPORT.

FEDERAL HIGHWAY ADMIN FUNDS

COLUMBIA SR 28/FURYS FERRY RD FM RIVERWATCH PKWY TO CR J'JiRICHMOND 221860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
STATUS: ~~!!~:~:Ei~~Ri~:i~L COLUMBIA SGN 3-17-92 FOR UTILIT~~ij!?

ii%~ogs~;)1i~ RC-CC-048
~:~: tbl:MBi: SURFACE TRlilii~okF:< FEDE~)hGHWAY Ari~rn fu~os

PE 1992 ROW.1996 CONST

UNDERWAY $ 1392 AFTER 97

PE 1992

UNDERWAY

ROW 1996

$ 2164

CONST 1997

$ 5174

FED SHARE $ 4139

GA. SHARE $ 1035

0TH SHARE $

COLUMBIA SR 28/FURY'S FERRY RD@ BASTON RD/VAUGHN RD 222230 INTERSECTION IMPROVEMENT/ RECST. OR REHAB.
PROJECT MILEAGE : .43 - EXIST. LANES: 2 /PROPOSED LANES: 4
MANAGER: D. CHURCH STATUS: CO SGN 3/92 PE/UTIL/ROW/50% STORE; AUGUSTA NO UTIL INVOLVED

PE LOCL

ROW 1993 UNDERWAY

FUND

SOURcii'sifRFACE

. .. :':"::'::CONST 1995

TRANsPdk@Yf

FED SHARE

$ $

FEDERAL .it:i:GRWAY ADMIN FUNDS ../ ..'/:' . .

GA. SHARE $

2443 1954
489

0TH SHARE $

COLUMBIA SR 47 SB FRM MP 2.45 NEAR KEG CREEK SOUTH TO MP 3.88 231350 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 1.43 MANAGER: D. GRIFFITH (M) STATUS: SEND LGPA IN 1996

CONG DIST. '',10 FUND SOURCE: SURFJ&li ~SPORT.
FEDERAL HIGHWAY Ab~:hf FUNDS

PE 1995
RO.W 1997 CONST

$

23

$

73

AFTER 97

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COLOMBIA SR 104/WASHINGTON RD@ CLUB CAR DRIVE 231370 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .30 - EXIST, LANES: MANAGER: D. GRIFFITH STATUS: COLUMBIS COUNTY SIGNED FOR UTILITIES

AUGUSTA TIP lt CC-076 CONG DIST. 10
5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

COLUMBIA SR 223, MP 3.98: 6.5: 242210 BRIDGES/ MAINTENANCE
PROJECT MILEAGE : .. 00
MANAGER: L. SEABROOK
STATUS: NOT APPLICABLE

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

COLOMBIA SR 383/BELAIR RD FM 25032X. RECONSTRUCTION &
PROJECT MILEAGE : ,00 MANAGER: D. CHURCH STATUS: LGPA NOT APPLICABLE

co .<:::\::::::

AUGUSTA TIP lt RC-CC-207 CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 250320 IS AN ASSOCIATED PROJECT.

.?!\~ COLOMBIA CR 145 FM BASTON TO RIVERWATCH PK;BASTON FM SR 104

N'l

250475 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES</ ,: ,: .

~=~~ PROJECT MILEAGE: .40

STATUS:

gOU~~~R~~GNED 3-3-92 FOR ROW AND :UTIIif~~j:/

?\:AUGUSTA TIP JI CC-7063 }//ii;oNG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. F...E...D:ERAL. HIGHWAY ADMIN FUNDS

COLU'MBIA SR 104 FM CR 91/SCOTTS WAY NW TO E/CR 515 (INc:t'\~RIDGES) 262080 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE : 2.21
MANAGER: B FERGUSON
STATUS: COLUMB+A COUNTY SIGNED FOR UTILITIES 11-19-91.

AUGUSTA Tfi(Jt CC-076 I PONG DIS";Ci)fo
FUNo'.$6~'t: SU~!l,CE T~$~6%f>
FEDERAt,ltIGHWAY Ab~J.~F\J~pS

22-Feb-1994
Page 6

FISCAL YEAR

COST ESTS

PE i994

UNDERWAY

ROW LOCL

CONST 1995

$

110

FED SHARE $

99

GA, SHARE .$

11

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

27

FED SHARE $

22

GA. SHARE $

5

0TH SHARE $

PE 1992 UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1993 UNDERWAY ROW LOCL
CONST 1995 $ 3073 FED SHARE $ 2458 GA. SHARE $ 615 0TH SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY $ 1995 AFTER 97

COLUMBIA CR 136/BASTON RD FM CR 145 N TO SR 28/MARTINEZ 262410 RECONSTRUCTION & WIDENING FROM 2 LANES T.O 4 LANES.
PROJECT MILEAGE: .72 . MANAGER: D. CHURCH . STATUS: COLUMBIA COUNTY SIGNED 3-3-92 F.OR ROW AND UTILITIES.
COLUMBIA CULVERT EXTENSIONS AT VARIOUS LOCATIONS 270860 BRIDGES/ MAINTENANCE
PROJECT MILEAGE : .00 MANAGER: L. SEABROOK STATUS: NOT APPLICABLE

itik6 souRciiT'iJt;AcE TRANSP<:ikfL
FEDERAL.FliGk~AY ADMIN FUNDS . :.:.:::i

PE 1992 . UNDERWAY

ROW LOCL

''//CONST 1995

$

505



FED SHARE $ .404

GA. SHARE $

101

CONG~~~:
FUND SOURCE: SURFACE f~sPORT.
FEDERAL HIGHWAY ADMIN FUNDS

R~;T;g;;-; 0

0

CONST 1995 $ 179

FED SHARE$ 143

GA. SHARE$

36

0TH SHARE$

,,

= =

~

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COLUMBIA COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl099 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH STATUS:

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

COLUMBIA COUNTY OPERATED PUBLIC TRANSIT 2Bll00 TRANSIT FACILITIES/
FUNDS RECIPIENT: COLUMBIA MANAGER: STEVE KISH STATUS:

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

COLUMBIA ONE STANDARD VAN AND 2C2099 rRANSIT FACILITIES/
FUNDS RECIPIENT: MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

CONG DIST. 10
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 7

FISCAL YEAR

COST ESTS

OPERATING 1995 $

47

FED SHARE $

28

GA. SHARE $

0TH SHARE $

19

OPERATING 1996 $

49

FED SHARE $

29

GA. SHARE $

0TH SHARE $

20

CAPITAL 1995

$

21

FED SHARE $

17

GA. SHARE $

2

0TH SHARE $

2

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
"PROJECT LISTING BY C_OUNTY FY 1995/FY 1997
COMMENTS

DODGE 231340
STATUS:

SR 27@ SR 87, SECOND SIGNALS/ SAFETY
PROJECT MILEAGE : .so -
MANAGER: D. GRIFFITH EASTMAN SGN 8-26-92 FOR UTILITIES

3 T&S

CONG DIST. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

DODGE 2Bll04
STATUS:

COUNTY OPERATED PUBLIC TRANSIT FACILITIES/ FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

DODGE 2Bll05
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

DODGE 2C2104
STATUS:

ONE CONVERSION VAN AND ONE MOBILE TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: DODGE MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 8
SOURCE: RURAL TRANSIT TRANSIT ADMIN FUNDS

22-Feb-1994 Page 8

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW 1994

$

5

CONST 1995

$

150

FED SHARE $

150

GA. SHARE $

0TH SHARE $

OPERATING 1995

$

79

FED SHARE $

47

GA. SHARE $

0TH SHARE $

32

OPERATING 1996

$

84

FED SHARE $

50

GA. SHARE $

0TH SHARE $

34

CAPITAL 1995

$

30

FED SHARE $

24

GA. SHARE $

3

0TH SHARE $

3

..

,,

~

=i;!

COUNTY P .I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

EMANUEL 222210
STATUS:

SR 26/SWAINSBORO@ SOUTHERN RR/REMOVE BRIDGE REMOVAL/ NEW CONSTRUCTION PROJECT MILEAGE : .42 - EXIST. LANES: MANAGER: D. GRIFFITH (M) REQ SWAINSBORO DO UTIL 12/91;

GRADE XING

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 9

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1995

$

60

CONST 1997

$ 1382

FED SHARE $ ll06

GA. SHARE $ 276

0TH SHARE $

EMANUEL 231130
STATUS:

SR 46_@ JACKS CREEK 1 MILE
REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH EMANUEL COUNTY SIGNED

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1995

$ 878

FED SHARE $ 702

GA. SHARE $

176

0TH SHARE $

EMANUEL 231380
STATUS:

SR 57/KITE RD@ INTERSECTION TMPR<~Vl~MI~~~~//
PROJECT MILEAGE : .36 MANAGER: D. GRIFFITH SWAINSBORO SGN 10-5-92 FOR

CONG DIST. l
3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW 1994 UNDERWAY

CONST 1995 $ 267

FED SHARE $ 240

GA. SHARE $

27

0TH SHARE $

EMANUEL 2Bll09
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

OPERATING 1995 $

33

FED SHARE$

19

GA. SHARE$

0TH SHARE$

14

EMANUEL 2Blll0
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: EMANUEL MANAGER: STEVE KISH

.OPERATING 1996 $

34

FED SHARE$

20

GA. SHARE$

0TH SHARE$

14

EMANUEL. 2C2109
STATUS:

ONE STANDARD VAN AND ONE MOBILE RADIO
TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: EMANUEL
MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 1.
FUND soui:~cifi
FEDERAL ..TruiliSIT

1997

$

21

FED SHARE$

17

GA. SHARE$

2

0TH SHARE$

2

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GLASCOCK COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1114 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH STATUS:

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

GLASCOCK COUNTY OPERATED PUBLIC TRANSIT 2B1115 TRANSIT FACILITIES/
FUNDS RECIPIENT: GLASCOCK MANAGER: STEVE KISH STATUS:

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 10

FISCAL YEAR

COST ESTS

OPERATING 1995

$

34

FED SHARE $

19

GA. SHARE $

0TH SHARE $

15

OPERATING 1996

$

35

FED SHARE $

20

GA; SHARE $

0TH SHARE $

15

"

=

=

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GREENE 221360
STATUS:

SR 12/GREENSBORO FM WALNUT ST TOE OF EAST GREENE ST
RECONSTRUCTION & WIDENING FROM 2 LANES TO\} LANES.
PROJECT MILEAGE : .39
MANAGER: D. GRIFFITH COUNTY SIGNED 6/6/88 FOR ROW AND

CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 221610 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 11

FISCAL YEAR

COST E_STS

PE 1992 UNDERWAY

ROW 1994 UNDERWAY

CONST 1995 $ 500

FED SHARE $

450

GA. SHARE $

50

0TH SHARE $

GREENE 221610
STATUS:

sR 12/GREENSBORO FM E oF EAST GRiil ~~>;o EB PA~J:~G LANE

i. ~~ ' ~= M;~A~NA~G~E~R:iLD'A. ~GR!cIF~FTITH ~E~s. ..4..i.. .

2 /PROPOSED ~Es= 3
,,,,,,,,,,,,c:c,,,.

REQ co Do Row & uTIL 12-2eJJ/8Ff~ sGN 3-21-90 Row, :9.fiL.

CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 221360 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1994 UNDERWAY

CONST 1997

$

937

FED SHARE $ 843

GA. SHARE $

94

0TH SHARE $

GREENE CR 38 @ RICHLAND CRE~k : (

270680 REPLACEMENT OF THE EXIS'.l'ING BRIDGES(S). NO ADDEQWE:S.

~Ei!~:i::;~iit~tr STATUS:

~OW, ~~~::RS jak 6-1~90

t UT_Il~Irti~:

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1991 UNDERWAY

ROW LOCL

CONST 1997 $ 156

FED SHARE$ 125

GA. SHARE$

31

0TH SHARE$

GREENE 270681
STATUS:

CR 66/LESLIE MILL RD@ BEAVERDAM CRK REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .25 MANAGER: D. GRIFFITH GREENE COUNTY SIGNED 6-1-90 FOR ROW,

DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1997 $ 196

FED SHARE$

157

GA. SHARE$

39

0TH SHARE$

GREENE 270870
STATUS:

CULVERT EXT@ VAR LOC ON STATE ROUTES .. OGLET/T.AiIF BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK NOT APPLICABLE

PE NONE $

0

r::::coNG DisiSfa

ROW NONE $

0

CONST 199.5 $ 211

FUND:166RcE: SURFACE T~s~6Rf.<

FEDl!:RAi.:iiiGHWAY ADMIN f@6s

\

27087X is AN ASSOCIATED'l?ROJECT. )

FED SHARE$

169

GA. SHARE$

42

0TH SHARE$

GREENE 2B1119
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GREENE MANAGER: STEVE KISH

.-:
'\)cc:JNG DIST. 11/:
FUND SOURCg;::IJt:r. TRANSIT
FEDERAL TRANsiT

1995 $

81

SHARE$

47

GA. SHARE$

0TH SHARE$

34

GREENE 2B1120
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: GREENE MANAGER: STEVE KISH

CONG DIST. \11
FUND SOURCE: FEDERAL TRANSIT

OPERATING 1996 $

86

FED SHARE$

50

GA. SHARE$

0TH SHARE$

36

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GREENE 2C2119
STATUS:

ONE CONV. VAN/LIFT, ONE STANDARD TRANSIT FACILITIES/ CAPITAL FUNDS~RECIPIENT: GREENE MANAGER: STEVE KISH LGPA NOT.APPLICABLE

CONG DIST . 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 12

FISCAL YEAR

COST ESTS

CAPITAL 1995

$

54

FED SHARE$

43

GA. SHARE$

6

0TH SHARE$

5

., .J ' l

-===-

~

~

~:

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HANCOCK 22230X
STATUS:

SR 15: NB MP-28.1-29.6/WASHINGTON/SB ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.00 MANAGER: UNKNOWN

.0-2.5/HANCOCK CO

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 222300 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 13

FISCAL YEAR

COST ESTS

PE 1995 ROW CONST

$

0

AFTER 97

AFTER 97

HANCOCK 231310
STATUS:

SR 15 OVER COPELAND CREEK .REHABILITATION OF THE PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH (M) SEND LGPA IN 1995

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 231330 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW 1996

$

6

CONST 1997 $ 250

FED SHARE $

200

GA. SHARE $

50

0TH SHARE $

HANCOCK SR 15 OVER WHITTEN 231330 BRIDGES/ RECST. OR
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH (M) STATUS: SEND LGPA IN 1995

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 231310 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW 1995

$

6

CONST 1996

$

285

FED SHARE $

228

GA. SHARE $

57

0TH SHARE $

HANCOCK 270990
STATUS:

SHOULDERBONE INDIAN MOUND/HISTORICAL RIGHTS-OF-WAY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: C. HAMILTON LGPA TO BE DONE BY CONTRACT

HANCOCK 2Bl124
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH

DIST. 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
-:::::: ..

PE NONE

$

0

ROW 1997

$

800

CONST NONE

$

0

DIS]Ii~l

1BtffiBk: FUN;

RURAL

TRANsiJ':'t(t'

9 ::_oPERATrn~E~ ~~ARE

~

5632

FEDERALTRANSIT ADMIN:iFtmOS

GA. SHARE$

0TH SHARE$

23

HANCOCK 2B1125
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH

HANCOCK 2C2124
STATUS:

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH LGPA NOT APPLICABLE

':'::'cc:>NG
''<;{ffif; souRcli'i@.AL TRANSIT FEDERAL :TRANSIT ADMIN
CONG::!(,
FUND SOURCE: FEDERAL TRANSIT

1996 $

59

FED SHARE$

34

GA. SHARE$

0TH SHARE$

25

CAPITAL 1995

$

33

FED SHARE$

26

GA. SHARE$

4

0TH SHARE$

3

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

HANCOCK 2C2125
STATUS:

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HANCOCK MANAGER: STEVE KISH LGPA NOT APPLICABLE

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 14

FISCAL YEAR

COST ESTS

CAPITAL 1996

$

33

FED SHARE$

26

GA. SHARE$

4

0TH SHARE$

3

,I

.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

JASPER 231520
STATUS:

SR 16@ SR 212 EAST OF MONTICELLO INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .25 - EXIST. LANES: MANAGER: D. GRIFFITH SEND LGPA IN 199

CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 15

FISCAL YEAR

COST ESTS

PE 1994

$

11

ROW 1995 $

12

CONST 1996 $ 371

FED SHARE$

334

GA. SHARE$

37

0TH SHARE$

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATlv;i DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

JEFFERSO SR 24/US 221 EB MP 12.6-13.8;WB 10.0-ll>,3;EB 3.2-4.3 231230 ADDITION OF A PASSING LANE.
PROJECT MILEAGE: 3.60 MANAGER: D. GRIFFITH (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS .

22-Feb-1994 Page 16

FISCAL YEAR

COST ESTS

PE ROW CONST

$

83

AFTER 97

AFTER 97

JEFFERSO SR 24 WB MP 22-23.3/EB 24.3-25.6}t-Wl!:i~f30.3&37-1.t/~~JRKE

o - st\ ' o o 23126X ~:~~~ ,I~~:~wi: 5 4

EX I

1
:t.Mds: /PROPOSED ~Es:

MANAGER: UNKNOWN

STATUS:

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 231260 IS AN ASSOCIATED PROJECT.

PE ROW CONST

$

0

AFTER 97

AFTER 97

JEFFERSO 231560
STATUS:

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1995

$

692

FED SHARE$

554

GA. SHARE$

138

0TH SHARE$

bmi~;- JEFFERSO RESTORE OLD MARKET HOUSE ON BROAD STREET/LOUISVILLE,

270980 ~~~~~~~~~iGiM~R~~~N~!I~T~N~i~i;ra~T/PROPOSEP.

0

MANAGER: C. HAMILTON

STATUS: LGPA TO BE DONE BY CONTRACT

FUND SOURCE: TRANS. ENHANCE.
{:::;:r FED.ERAL HIGHWAY ADMIN FUNDS
>:

PE LOCL

ROW NONE $

0

CONST 1996 $ 170

FED SHARE$

136

GA. SHARE$

0TH SHARE$

34

1

JEFFERSO COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll29 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: JEFFERSON MANAGER: STEVE KISH
STATUS:

\CONG DIST:; 1

;:~ 18Uk2[ > RURAL TRANsJ?

9 PPERATIN;E~ ~~ARE :

82 47

FEDEifil,,i.TRANSIT ADMIN

GA. SHARE$

0TH SHARE$

36

JEFFERSO COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll30 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: JEFFERSON MANAGER: STEVE KISH STATUS:

fl~tt: ~IST. um:~!ll'";
souRci{lkJfu TRANSIT
ADMIN

1996 $

87

FED SHARE$

50

GA. SHARE$

0TH SHARE$

38

JEFFERSO ONE STANDARD VAN AND ONE MOBILE RADIO 2C2129 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: JEFFERSON MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

CONG DIST. i,11
FUND SOURCE: FEDERAL

CAPITAL 1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

. ,

~

ta~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

JENKINS 221640
STATUS:

SR 23/US 25 @OGEECHEE RIVER SOUTH OF REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: K FULBRIGHT (M) REQ JENKINS COUNTY DO UTILITIES_

2 TO 4 LANES.

CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221645 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 17

FISCAL YEAR

COST ESTS

PE 1996 ROW NONE CONST

$

195

$

0

AFTER 97

JENKINS 221645
STATUS:

US 25@ OGEECHEE RIVER OFLW REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: K FULBRIGHT (M) REQ JENKINS COUNTY DO

CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221640 IS AN ASSOCIATED PROJECT.

PE 1996 ROW NONE CONST

$

36

$

0

AFTER 97

JENKINS .2B1134
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: JENKINS MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1995 $

32

FUND SOURCE: RURAL TRANSIT

FED SHARE $

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

14

JENKINS 2B1135
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: JENKINS MANAGER: STEVE KISH

DIST. 11

OPERATING 1996 $

33

SOURCE: RURAL TRANSIT

FED SHARE $

18

TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

14

JENKINS 2C2134
STATUS:

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE TRANSIT FA_CILITIES / CAPITAL FUNDS RECIPIENT: JENKINS MANAGER: STEVE KISH LGPA NOT APPLICABLE

1995

$

33

FED SHARE$

26

GA. SHARE$

4

0TH SHARE$

3

COUNTY P,I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY -1995/FY 1997
COMMENTS

LAURENS 210500
STATUS:

I-16@ SR31/US 441 IN DUBLIN & INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : ,56 - EXIST, MANAGER: J. GARLAND REQ LAURENS DO UTIL 3-23-92; DUBLIN

CONG DIST. 8

4

GRIP PROJECT

FUND SOURCE: I-STATE MAINT.

FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 18

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1994

$

200

CONST 1995

$ 1642

FED SHARE $ 1478

GA. SHARE $

164

0TH SHARE $

LAURENS 210650
STATUS:

I-16 ACROSS OCONEE RIVER AND BRIDGES/ RECST, OR REHAB. PROJECT MILEAGE : 2.22 MANAGER: GENE POWELL (M) REQ LAURENS COUNTY DO

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1996

$ 6195

FED SHARE $ 5576

GA. SHARE $

620

0TH SHARE $

LAURENS I-16 AT TURKEY CK,

210660 BRIDGES/ RECST. OR

PROJECT MILEAGE : .00

MANAGER: GENE POWELL (M)

STATUS: REQ LAURENS COUNTY DO

i{t::

LAURENS 221810

s-id~j ~/;ii SR 19/DUBLIN FM MULTI-LN @ INDUSTRIAL BLVD NW TO

RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES,::}((\/::,:-:-

PROJECT MILEAGE : 1. 92

...

STATUS: =A~~~!/~~B~~~~i-Jg\UBLIN SGN 2/l/9ltc:J;TY: ~$ff;IES

CONG DIST. 8 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
60NG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. - FED.ERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW ,NONE

$

0

CONST 1996

$ 1261

FED SHARE $ 1135

GA. SHARE $

126

0TH SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY

$

145

AFTER 97

LAURENS 221820
STATUS:

1
SR 29/US 441 FM NORTHVIEW AVE TO 600' N/TE~:: 11:RIVE&BRID~E . _RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.56 MANAGER: K FULBRIGHT REQ .CO DO UTIL 9-5-90; CITY/DUBLIN SIGNED 9/14/90-UTILITt~

PE 1992

UNDERWAY

-ROW 1992

UNDERWAY

CONST 1996

$ 2210

FED SHARE $ 1768

GA. SHARE $

442

0TH SHARE $

LAURENS 222010
STATUS:

SR 117@ BAY CREEKS/CADWELL REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .10 MANAGER: D. GRIFFITH LAURENS COUNTY SIGNED 5-17-91 FOR UTILITIES.

LAURENS 271000
STATUS:

NATHANIEL DRIVE FROM SR 26 TO SR 199 IN EAST DUBLIN RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.42 MANAGER: D. GRIFFITH (M) SEND LGPA IN 1994 TO LAURENS & EAST DUBLIN FOR ROW & UTI~

tb:>NG DIST.
-;{fuo SOURCi}: }1%GE PROGRAM
FEDE~:.~:r,m~Ar ADMIN
?)_.
CONG DIST :-:::::8
FUND SOURCE: FEDERAL HIGHWAY

PE 1993 UNDERWAY

ROW 1993 :-,:;::::::.::(ci)NS:T 19 9 5

UNDERWAY

$

201

FED SHARE $

161

GA. SHARE $

40

0TH SHARE $

PE 1995 ROW LOCL CONST

$

100

AFTER 97



.. - "

=- ~ .

.

GEORGIADEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 19

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

----------------------------------------------------------------------------------------------------------------------------------

LAURENS COUNTY OPERATED PUBLIC TRANSIT SERVICE

2Bll44 TRANSIT FACILITIES / OPERATION_S

CONG DIST. 8

FUNDS RECIPIENT: LAURENS

OPERATING 1995

$

64

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE $

36

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

27

LAURENS 2Bll45
STATUS:

COUNTY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: LAURENS MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1996

$

67

FUND SOURCE: RURAL TRANSIT

FED SHARE $

38

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

29

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

LINCOLN 231360
STATUS:

SR 47 SB FM MP 8.28-9.22; NB MP 0.93-2.28 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.29 MANAGER: D. GRIFFITH (M) SEND LGPA WHEN PROJECT IS ADDED TO

CONG DIST. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 20

FISCAL YEAR

COST ESTS

PE ROW CONST

$

37

AFTER 97

AFTER 97

LINCOLN 242220
STATUS:

CR 262/WOODLAWN ROAD @ LLOYD CREik/dJB:' SW OF LINt6iNTON

REPLACEMENT OF THE EXISTING BRtPGE$JSj. NO ADDED LANES.

~~g~:= J! PROJECT MILEAGE : 20

..,{....... .........

' i i / / ..
1

.)8k cgtm~~I;i~~:D <~t.,2f~~

ROW, UTILITIES & ibuRs

LINCOLN 262450
STATUS:

~?;[ ~;::~~ cR 63/PETERsBuRG

N To sR 43 NEAR LINcof~~l~:

RECONSTRUCTION & WIDENING( NO LANE ADDITION PROJ?Q.SE6}

8 ~~i~:M~~E~:~F;Iiii ~Ml ;:

SEND LGPA WHEN PROJECT IS ADD~D/I'Q. CWP

CONG DIST. 10 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 10 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW LOCL

CONST 1996 $ 271

FED SHARE $ 217

GA. SHARE $'

54

0TH SHARE $

PE 1995 ROW LOCL CONST

$

10

AFTER 97

LINCOLN COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bl149 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: LINCOLN 'MANAGER: STEVE KISH
STATUS:

LINCOLN 2B1150
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH

LINCOLN 2C2149
STATUS:.

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: LINCOLN MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 10

OPERATING 1995 $

27

SOURCE: RURAL TRANSIT

FED SHARE$

16

~-~~l<,11,~. TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

11

OPERATING 1996 $

27

RURAL TRANS! /

FED SHARE$

16

ADMINFUNDS

GA. SHARE$

0TH SHARE$

11

DIST. lq lj)

~Jk . SOU~F.i

TRANSIT

FEDE~_,,':l:'BJWSIT ADMIN

1995

$

20

FED SHARE$

16

GA. SHARE$

2

0TH SHARE$

2

"

~I

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

MADISON 27102X
STATUS:

WATSON MILL COVERED BRIDGE BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER: UNKNOWN

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997

COMMENTS

RVR;OGLETHORPE

CONG DIST. 10

FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 21

FISCAL YEAR

COST ESTS

PE NONE $

0

ROW NONE

$

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

COUNTY P. I.NO.

DESCRIPTION . PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY.1997
COMMENTS

MCDUFFIE CR 308 NW OF THOMSON@. MIDDLE CREEK 231180 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH STATUS: McDUFFIE SGN FOR ROW, UTILITIES &

LANES.

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 231182 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 22

FISCAL YEAR

COST_ ESTS

PE 1993

UNDERWAY

ROW LOCL

CONST 1995

$

347

FED SHARE $

278

GA. SHARE $

69

0TH SHARE $

MCDUFFIE CR 308 NORTH OF THOMSON@ 231182 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH
STATUS: McDUFF.IE SGN TO DO ROW,_c:,:,:;,,t,.)Jc,:/:,)'"'.1:."

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 231180 IS AN ASSOCIATED PROJECT.

PE 1993

UNDERWAY

ROW LOCL

CONST 1995

$

211

FED SHARE $

169

GA. SHARE $

42

0TH SHARE $

MCDUFFIE ORIG. TOWN OF 270970 SIGNING/ ENHANCEMENT
PROJECT MILEAGE : .00 MANAGER: C. HAMILTON STATUS: LGPA TO BE DONE BY CONTRACT

CONG DIST. 10 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW NONE

$

0

CONST 1996

$

31

FED SHARE $

25

GA. SHARE $

0TH SHARE $

6

MCDUFFIE COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll54 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MCDUFFIE MANAGER: STEVE KISH STATUS:

OPERATING 1995

$

70

FUND SOURCE: RURAL TRANSIT

FED SHARE$

40

.F'.EDE~. TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

30

MCDUFFIE COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll55 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MCDUFFIE MANAGER: STEVE KISH STATUS:

Dis'.f:i1 0
F=~\:iaill{8k; RURAL TRANsri :::
FEDERAL' TRANSIT ADMIN. FUNDS'

$

73

SHARE$

42

GA. SHARE $

0TH SHARE$

31

MCDUFFIE ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO 2C2154 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: MCDUFFIE MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

:!a~:G DIST.
. FUND SOURCE; k&fu TRANSIT
FEDERAL ,TRANSIT ADMIN

1995

$

33

FED SHARE$

26

GA. SHARE$

4

0TH SHARE$

3

oa==

=

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MORGAN 210560
STATUS:

I-20 REST AREA f52 & 53
REST AREA/ RECST. OR REH~. PROJECT MILEAGE : . 00 - EXIST. LANES:
MANAGER: J. GARLAND (C) DOT TO PAY 1-21-94

LANES: 0

CONG DIST. 10
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY AOMIN FUNDS

22-Feb-1994 Page 23

FISCAL YEAR

COST ESTS

PE 1993 ROW 1996 CONST

UNDERWAY

$

80

AFTER 97

MORGAN 222030
STATUS:

SR 83@ HARO LABOR CRK REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH MORGAN COUNTY SIGNED

MORGAN 2Bl159
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH

MORGAN 2Bl160
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH

MORGAN 2C2159
STATUS:

ONE STANDARD VAN ANO ONE MOBILE RADIO TRANSIT FACILITIES./ CAPITAL FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH LGPA NOT APPLICABLE

MORGAN 2C2160
STATUS:

ONE STANDARD VAN ANO ONE MOBILE RADIO TRANSIT. FACILITIES / CAPITAL FUNDS RECIPIENT: MORGAN MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

UNDERWAY

CONST 1995 $ 1075

FED SHARE $

860

GA. SHARE $

215

0TH SHARE $

CONG DIST. 10

OPERATING 1995

$

53

FUND SOURCE: RURAL TRANSIT

FED SHARE $

30

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE $

0TH SHARE $

23

DIST. 10

OPERATING 1996

$

57

SOURCE: RURAL TRANSIT

FED SHARE $

32

TRANSIT AOMIN FUNDS

GA. SHARE $

0TH SHARE $

25

....:::.::=::,::_CAP ITAL 1995

$

21

RURAL TRANSIT : ..
ADMIN:FtrNos

FED SHARE$

17

GA. SHARE $

2

0TH SHARE$

2

1996

$

21

FED SHARE$

17

GA. SHARE$

2

0TH SHARE$

2

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 24

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. ---------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M-E-N-T-S---------------------------Y-E-A-R---------E-S-T-S--

NEWTON I-20 AT GA. RR, ALCOVY RD, ALCOVY RVR & .OVERFLOW

PE 1994

UNDERWAY

210640 BRIDGES/ RECST. OR REHAB.

CONG DIST. 10

ROW NONE

$

0

PROJECT MILEAGE : .00

CONST 1996

$ 2812

MANAGER: G. ROSS

FUND SOURCE: I-STATE MAINT.

FED SHARE $ 2531

STATUS: REQ COVINGTON DO UTIL 10-5-93; NEWTON

UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

281

0TH SHARE $

NEWTON 222040
STATUS:

NEWTON 241980
STATUS:

SR 12 @ SR 142 (TURN lliJ:iJi:f & UPGRADE TRAFFIC

INTERSECTION IMPROVEMENT(/\. SAFETY

. ,,,,,,,/cii:C:i//i

PROJECT MILEAGE :. 30 - EX:[ST. LANES: 2 /PROP0!?1';P{~ES: 3

MANAGER: D. GRIFFITH

COVINGTON SGN 9-16-91 FOR

CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
231290 IS AN ASSOCIATED PROJECT.

PE 1993 . UNDERWAY_

ROW 1995

$

so

. CONST 1996

$ 1054

FED SHARE $ 949

GA. SHARE $

105

0TH SHARE $

CONG DIST. 10
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW LOCL

CONST 1995

$

517

FED.SHARE$

465

GA. SHARE$

52

0TH SHARE$

NEWTON 242100.
STATUS:

NEWTON 271010
STATUS:

CR 263/CONLEY DITCH ROAD@ LAKE JACKSON 10 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED PROJECT MILEAGE : .21 MANAGER: D. GRIFFITH (M) SEND LGPA 10/94

DIST. 4

FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

\/{:t:::-

:t

)coNG Drsll tio

PE.1993 UNDERWAY

ROW LOCL

CONST 1995

$

327

FED SHARE $

294 .

GA. SHARE $

33

0TH SHARE $

PE 1995

$

ROW LOCL

CONST.1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

11
400 320
80'

-==

== =

~

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 25

FISCAL YEAR

COST ESTS

OCONEE 22256X
STATUS:

SR 24/US 441 FM MADISON BYP JUST N OF UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER:

RIV/ MORGAN

PE 1995

CONG DIST. 10

ROW

GRIP PROJECT

CONST

FUND SOURCE: GOVERNOR'S RD IMP PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

$

0

AFTER 97

AFTER 97

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

OGLETHOR SR 77 EAST OF LEXINGTON@ BIG INDIAN 222050 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE: .30 MANAGER: D. GRIFFITH STATUS: OGLETHORPE COUNTY SGN

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 222052 IS AN ASSOCIATED PROJECT.

OGLETHOR SR 77EAST OF LEXINGTON@ 222052 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .55 MANAGER: D. GRIFFITH STATUS: OGLETHORPE COUNTY SGN

CONG DIST. 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 222050 IS AN ASSOCIATED PROJECT.

OGLETHOR SR 10 FM 10.2-2.2; 222460 ADDITION OF A PASSING
PROJECT.MILEAGE : 9.23 MANAGER: D. GRIFFITH (M) STATUS: SEND LGPA WHEN PROJECT IS

CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 26

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1995

$

1

CONST 1996

$

387

FED SHARE $

310

GA. SHARE $

77

0TH SHARE $

PE 1993

UNDERWAY

ROW 1995

$

500

CONST 1996

$

410

FED SHARE $

328

GA. SHARE $

82

0TH SHARE $

PE ROW CONST

$

149

AFTER 97

AFTER 97

OGLETHOR CULVERT EXT@ VAR LOC ON STATE 27087X BRIDGES/ MAINTENANCE
PROJECT MILEAGE : .00 MANAGER: L. SEABROOK STATUS:
OGLETHOR WATSON MILL COVERED BRIDGE/CR 271020 BRIDGES/ ENHANCEMENT
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS: DOT WILL PROVIDE THE 20% MATCH
OGLETHOR BIG CLOUDS CREEK COVERED BRIDGE OVER BIG CLOUDS CREEK 271025 BRIDGES/ ENHANCEMENT
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS: DOT WILL PROVIDE THE 20% MATCH

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

0

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $

FEDERAL HIGHWAY ADMIN FUNDS
i2dOe:10<:ts AN ASSOCIATED PROJECT.
::;::::::.:::::=::-:-

GA. SHARE $ 0TH SHARE $

)\~::G Did:j i[o ...... =. ..... ,,.. F~;~~wl: TRAN~. ENH~ti: FEDE.tUill :HIGHWAY AbMIN 'FUNDS

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

122

FED SHARE $

98

GA. SHARE $

24

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

1995

$

77

FED SHARE $

62

GA. SHARE $

15

0TH SHARE $

..

= =

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

PUTNAM 222020
STATUS:

SR 16@ LITTLE RIVER W/EATONTON REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH REQ PUTNAM COUNTY DO UTILITIES

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PUTNAM 222450
STATUS:

SR 24 AT WASHINGTON AVENUE SIGNALS/ SAFETY PROJECT MILEAGE : .12 MANAGER: BURT RIDDLE CONTACT TRAFFIC

CONG DIST. 11
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PUTNAM 2Bll64
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH

CONG DIST. 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

PUTNAM 2Bll65
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH

DIST. 11
SOURCE: RURAL TRANSIT TRANSIT ADMIN FUNDS

PUTNAM 2C2165
STATUS:

ONE STANDARD VAN AND ONE MOBILE RADIO, TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PUTNAM MANAGER: STEVE KISH LGPA NOT APPLICABLE

22-Feb-1994 Page 27

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST.1995 $ 1200

FED SHARE$

960

GA. SHARE$ . 240

0TH SHARE$

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1995

$

198

FED SHARE $ 198

GA. SHARE $

0TH SHARE $

OPERATING 1995 $

67

FED SHARE $

39

GA. SHARE $

0TH SHARE $

28

OPERATING 1996 $

70

FED SHARE $

41

GA. SHARE $

0TH SHARE $

29

1996

$

21

FED SHARE$

17

GA. SHARE$

2

0TH SHARE$

2

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

RICHMOND I-20@ SAVANNAH RIVER 210327 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: D. CHURCH STATUS: LGPA NOT APPLICABLE

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
AUGUSTA TIP i GR 011
CONG DIST. 10
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 210570 IS AN ASSOCIATED PROJECT.

smi&thiit:~~RK s:t:!\,To RICHMOND I-520 FM I-20 TO SR 56SP INCL

FM

56SP

AUGUSTA TIP i RC-520

210360 STATUS:

RIDING SURFACE REHABILITATION.,:(ij'tJajfACE, GRIND, SE,$}:, STRIPE ETC.CONG DIST. 10 & 11

1J8IBI > ...... PROJECT MILEAGE : 3. 60 - EXISTU!tfil.i'ES: 4 /PROPOSED ~ES: 4
~!G:~; ~!~i~~~:TTHIS

FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

210430 IS AN ASSOCIATED PROJECT.

WRIGHTSBOR;:;ffilF~:o """ , FJIIt ): RICHMOND I-520 FM

21Y430

210430 RECONSTRUCTION & WIDENI?'IG 'FROM 4 LANES TO 6 LANEiW

AUGUSTA TIP i RC-520
CONG DIST. 10

PROJECT MILEAGE': 1.37

MANAGER: K FULBRIGHT

FUND SOURCE: NAT'L HIGHWAY

STATUS: REQ RICHMOND COUNTYDO

FEDERAL HIGHWAY ADMIN FUNDS

210360 IS AN ASSOCIATED PROJECT.

RICHMOND I-520 FM WHEELER RD TO WRIGHTSBORO RD; 210440 RECONSTRUCTION & WIDENING FROM 4 LANES
PROJECT MILEAGE : 1.32 MANAGER: K FULBRIGHT STATUS: RICHMOND COUNTY SIGNED FOR UTILITIES
RICHMOND I-520 FM WHEELER RD NORTH TO I-20 210450 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : .76 MANAGER: K FULBRIGHT STATUS: SEND.LGPA IN 1996
RICHMOND I-20@ WHEELER RD/ALSO COLUMBIA CO 210490 INTERCHANGE/ NEW CONSTRUCTION
PROJECT MILEAGE: .27 - EXIST. LANES: 4 /PROPOSED LANES: 6 MANAGER: NEIL DAVIS STATUS: RICHMOND & COLUMBIA SGN UTIL 12-91; CITY SGN PUB UTIL 2-92
RICHMOND I-520 FM WRIGHTSBORO RD TO GORDON HWY- FOR IM; SEE 210430 21Y430 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STATUS:

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
cii:U'.16 Is .illi ASSOCIATED PROJECT:
~;;S~tJ\.: Rc-520 --:::>=, ~:~~!i!~!~w!~TJM~~r:~~~\
Rti2i~~ ~:::
FUND SOURci:t~~;;~ HIGHWAY.
FEDERAL -HIGli#AY ADMIN 250430fs:ANASSOCIATED
'Ji'(
CONG DIS;":\,,O _& 0
FUND SOURCE: FEDERAL HIGHWAY

22-Feb-1994 Page 28

FISCAL YEAR

COST ESTS

PE ROW NONE CONST

$

50

$

0

AFTER 97

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1995

$ 5546

FED SHARE $ 4991

GA. SHARE $

555

0TH SHARE $

PE 1994

UNDERWAY

ROW 1996

$

574

CONST 1997

$ 2053

FED SHARE $ 1642

GA. SHARE $

411

0TH SHARE $

PE 1994

UNDERWAY

ROW 1996

$ 2500

CONST 1997

$ 2042

FED SHARE $ 1634

GA. SHARE $

408

0TH SHARE $

PE 1994 ROW 1996 CONST

UNDERWAY $ 1000 AFTER 97

PE .1992

UNDERWAY

ROW 1993 UNDERWAY

1995

$ 8730

FED SHARE $ 6984

GA. SHARE $ 1746

0TH SHARE $

PE NONE

$

0

ROW NONE

$. .

0

CONST 1997

$ 1061

FED SHARE $

955

GA. SHARE $

106

0TH SHARE $

"""""""' .,,..,.,,,,,,

i,Y,._..,.,~hOtl

: .,.

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

RICHMOND I-520 FM WHEELER RO TO WRIGHTSBORO RD- E;OR IM; SEE 210440

~~~~ 21Y440

,I~~~wr: 00 - EXIST. LANES: 0 /ftOPOSEO LANES: 0

MANAGER:

STATUS:

CONG DIST, 0 & 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 210440 IS AN ASSOCIATED PROJECT.

RICHMOND BOBBY JONES EXPRESSWAY BRIDGE 220107 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : ,00 MANAGER: UNKNOWN STATUS: NOT APPLICABLE

TO SC

CONG DIST, 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 29

FISCAL YEAR

COST ESTS

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0 0 3086 2777 309

PE 1995 ROW NONE CONST

$

150

$

0

AFTER 97

RICHMOND SR 4/15TH ST/AUGUSTA tA:iit~EOGEVILLE RO TO

ST

220680 RECONSTRUCTION & WIDENING/FROM 2 LANES TO 4

ooif:E PROJECT MILEAGE : .87
MANAGER: BILL MOSKAL

=t!It==

STATUS: CO SGN 12-6-88 & CITY SGN ~{1ii"cB8.YTIL.

tti:jl::-::
,Wff Roii-t,

AUGUSTA TIP# RC-038 CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

PE 1992

UNDERWAY

ROW 1995

$

735

CONST 1997

$ 1912

FED SHARE $ 1530

GA. SHARE $

382

0TH SHARE $

RICHMOND sR 56 FM sR 23 To sR 56 sP;NEw Loc To sR s6;To BENNot'iilf.HtiF 221180 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES,..///'"
PROJECT MILEAGE: 6.20 MANAGER: RAY METTS STATUS: SIGNED.BURKE 6/86 ANO RICHMOND

J :+AuGusTA TIP t Rc-030
i{:{}(f:oNG DIST. 10
.. FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS d2:fias>!s AN ASSOCIATED PROJECT.

PE 1992

UNDERWAY

ROW 1992

UNDERWAY

CONST 1997

$ 6487

FED SHARE $ 5190

GA. SHARE $ 1297

0TH SHARE $

RICHMOND SR 56@ MCBEAN CREEK/ALSO BURKE CO

221185 REHAB. OF THE EXISTING BRIOGE(S). FROM 2 LANES TO 4

PROJECT MILEAGE : 00

_J

MANAGER: RAY METTS

STATUS: UNDER 221180 - REQ RICHMOND 00 UTILITIES 4-19-88

RICHMOND SR 56 SP/NEW SAVANNAH RO FM I-520 N TO US 78/GOROON HWY 221470 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,
PROJECT MILEAGE: 3.12 MANAGER: D. CHURCH STATUS: RICHMOND COUNTY SIGNED 11/22/88 FOR ROW ANO UTILITIES

: CQijG OI9#:t io

PE 1993 ROW NONE

UNDERWAY

$

0

kbldf': F~;g

BRIDGE PROG~ }

CONST 1997

$ 1400

FED SHARE $ 1120

~~~fffli~r:wf!s~~l;itP~g~JEcT ./

GA. SHARE $ ,OTH SHARE $

280

f5~~~J: ..;.i::~g!is~~s~:P 1 ! :

PE 1992 .UNDERWAY

ROW LOCL

tONST 1995

$

FUND SOURCE: ~iT L HIGHWAY :

FED SHARE$

FEDERAL ..iifokwAY AOMIN FUNDS /

GA. SHARE$

25034#~)\:N ASSOCIATED PROJECT'.

0TH SHARE$

4200 3360
840

RICHMOND SR 10/GOROON HWY FM SR 223 TOW/FORT GORDON GATE #1/&CLVT 221532 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.50 MANAGER: BILL MOSKAL (C) STATUS: RICHMOND SIGNED FOR UTILITIES 4-7-92.

AUGUSTA ftp# GH 025 CONG DIST .10 FUND SOURCE: SURFAciiii~SPORT.
FEDERAL HIGHWAY }J:>t-lIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

346

CONST 1996 $ 4700

FED SHARE $ 3760

GA. SHARE $

940

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEP_ARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

RICHMOND SR 4/DEANS BR RD FM S FT GORDON 221550 TURN LANES/ RECST. OR REHAB.
PROJECT.MILEAGE : 6.29 - EXIST. MANAGER: D. GRIFFITH STATUS: REQ RICHMOND COUNTY DO UTILITIES

LANES: 4

AUGUSTA TIP i RC-043
CONG DIST. 11 & 10
GRIP PROJECT
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

RICHMOND SR 415@ UTILITY; ROCKY; 221580 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .00 MANAGER: D. SMITH STATUS: RICHMOND COUNTY SIGNED

UTILITIES.

AUGUSTA TIP t RC-117
CONG DIST. 11
FUND SOURCE: NAT'L -HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 221588 IS AN ASSOCIATED PROJECT.

RICHMOND SR 415 FM NEW :SAVAJNN,!Ui-'ccl<U 221588 CONSTRUCTION OF
PROJECT MILEAGE : 5.15 MANAGER: D. SMITH STATUS: COUNTY SIGNED 8/8/89 FOR

AUGUSTA TIP t RC-117
CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 221580 IS AN ASSOCIATED PROJECT.

RICHMOND SR 28/FURYS FERRY RD FM RIVERWATCH PK TO CR 98/SEE -~~:~~~D~~ 22186X RECONSTRUCTION & WIDENING. NO LANE ADDITION
PROJECT MILEAGE : :. 00 MANAGER: D. CHURCH -
STATUS:

TIP# RC-CC-048 DIST. 10
SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
}if860i:i:; AN ASSOCIATED PROJECT.

k., RICHMOND I-520/SR 415@ SR 56 ADD WB LOOP

d :JV 222350

RAMP/ NEW CONSTRUCTION PROJECT MILEAGE : .00 -

EXIST.

LANES:

0

/PROPOSED

LANEsi

... -- AUGUSTA :~ RC-520
)<:;<:>.P..G DI~:t; Jo & 11.

MANAGER: D. CHURCH . (M)

F~6:1BW~i: I-STATE MAfi;lf(:

STATUS: RICHMOND COUNTY SIGNED FOR UTILITIES 12-15-92

tEotru :HIGHWAY Ab~rn ttmos

22-Feb-1994 Page 30

FISCAL YEAR

COST ESTS

PE 1994

UNDERWAY

ROW 1995

$

45

CONST 1996

$ 1150

FED SHARE $

920

GA. SHARE $

230

OTH-SHARE $

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1996

$ 6849

FED SHARE $ 5479

GA. SHARE $ 1370

0TH SHARE $

PE 1991

UNDERWAY

ROW NONE

$

0

CONST 199.6

$ 7600

FED SHARE $ 6080

GA .. SHARE $ 1520

0TH SHARE $

PE 1992 UNDERWAY

ROW 1996

$

0

CONST 1997

$

0

FED SHARE $'

GA. SHARE $

0TH SHARE $

PE 1993
ROW 1996 CONST

UNDERWAY $. 1000 AFTER 97

RICHMOND SR 4/US 1@ TOBACCO RD IN AUGUSTA
222370 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: D. CHURCH (M)
STATUS: SEND LGPA IN 1996.

:1 k&~~:TA TIP ,
ONG DIST. 10
G~;P PROJEQ't\ _
FUND SOURCE:}-NAT' L HIGHWAY FEDE:.R:::. AL.H.I.G..H...W.. AY ADMIN

RICHMOND GREENE STREET FM 12TH STREET TO 4TH STREET IN AUGUSTA 222430 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : 1.36 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. GRIFFITH STATUS:. CONTACT TRAFFIC OPERATIONS

AUGUSTA iP t RC-048

CONG DIST.\11

_.//?(::CC{/

FUND SOURCE: HWY._., ,-.:SJ'U' ;1 FEDERAL HIGHWAY

PE 1994 ROW 1996

UNDERWAY

$

25

AFTER 97

PE 1994

UNDERWAY

ROW 1995' $

1,0

CONST 1997

$

578

FED SHARE $

520

GA. SHARE $

58

0TH SHARE $

.......,.,,.

' ; .. ' :..~,-

COUNTY P.-I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

RICHMOND SR 88 FM W/CR 65/HEPHZIBAH E TO SR 231000 RECONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE : 2.30 MANAGER: D. GRIFFITH STATUS: RICHMOND SGN 8-8-89 & HEPSIBAH

CONG DIS_T. 10
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 31

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1992

UNDERWAY

CONST 1995

$ 2007

FED SHARE $ 1606

GA. SHARE $

401

0TH SHARE $

RICHMOND CSX RAILROAD AT OLIVE RD 240809 BRIDGES/ SAFETY
PROJECT MILEAGE : .00
MANAGER: D. CHURCH STATUS: CITY SGN 5/91 ROW/UTIL

AUGUSTA TIP i RC-9104 CONG DIST. 11 & 10
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 24Y809 IS AN ASSOCIATED PROJECT.

PE 1991 UNDERWAY

ROW LOCL

CONST 1996

$ 3219

FED SHARE $ 2575

GA. SHARE $

644

0TH SHARE $

RICHMOND CSX RR AT OLIVE RD 24Y809 UNKNOWN/ SAFETY
PROJECT MILEAGE : .00 MANAGER: D. CHURCH STATUS: LGPA NOT APPLICABLE

AUGUSTA TIP i RC-9104 CQNG DIST. 11 & 10
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 240809 IS AN ASSOCIATED PROJECT.

PE 1991

UNDERWAY

ROW LOCL

CONST 1996

$ 2306

FED SHARE $ 2191

GA. SHARE $

115

0TH SHARE $

RICHMOND BELAIR RD EXT FM FT GORDON GATE 1 TO BELAIR

\AUGUSTA TIP II RC-CC-207

PE 1992

UNDERWAY

250320 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4

(\:;QNG DIST. 10

ROW 1993

UNDERWAY

PROJECT MILEAGE : 3.28

CONST 1995

$ 19963

~t:~1 STATUS:

~GNc:~:iHUTIL;RICHMOND SGN 10/90''g;q,t{~:;/:6:R $600K

FUND SOURCE: NAT'L HIGHWAY fJ;:l)ERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 15970 GA. SHARE $ 3993

0TH SHARE $

RICHMOND SR 56 SPUR/NEW SAVANNAH RD@ ROCKY CREEK 250340 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4

.~,i: 'WM,i~~f Rc-207

PE 1986 ROW 1987

UNDERWAY UNDERWAY

PROJECT MILEAGE : .30 MANAGER: D. CHURCH

FUND sd&td:E = BRIDGE PROGRAM:> =

CONST 1995

$

594

FED SHARE $

475

STATUS: LGPA SIGNED BY CO 8-20-85 FOR UTILITIES

FEDERii:i:}:liIGHWAY ADMIN FUNDS

: :'\

GA. SHARE $

119

22i-4_10==Is AN AssocAirib PROJECT./

0TH SHARE $

RICHMOND WINDSOR SPRINGS RD FM TOBACCO RD TO MEADOWBROOK DR 250374 RECONSTRUCTION & WIDENING FROM.2 LANES TO 4 LANES.
PROJECT MILEAGE : 1.82 MANAGER: D. SMITH STATUS: SIGNED 1-5-88 FOR ROW & UTILITIES. SEE MR-7007(2)
RICHMOND CR 65/WINDSOR SPRINGS RD@ BUTLER CREEK 250375 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES.
PROJECT MILEAGE : .00 MANAGER: D. SMITH STATUS: RICHMOND COUNTY SIGNED 1-5-88 FOR ROW AND UTILITIES

PE 1992

UNDERWAY

ROW LOCL

........,,.,,.::coNST 1995 $

FCJND SOURcit'ii;;~ACE TRANSPokfk t

FED SHARE $

~~~j~Jj~~W!!s~~i~E~u:~;;k2ffi(

~*H :::~ ~

4607 3455 1152

~~~~s~1s!~l1~ :c;:6007}! : }
FUND souRcE = BRrnrik VitoGRAM FEDERAL HIGHWAY AbMIN FUNDS 250374 IS AN ASSOCj:11,~ED PROJECT.

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$

556

FED SHARE$

445

GA. SHARE$

111

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 32

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST.

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

R-I-C-H-M-O-N-D--W--H-E-EL-E-R--R-D-/-C-R--6-0-1--F-M--I---2-0--T-O--M-E-D--IC-A-L--C-E-N-T-E-R--D-R-IV-E------------------A-U-G-U-S-T-A--T-IP---ff--R-C---C-C---7-0-11----------------P-E--1-9-9-2------U-N-D-ER-W--AY

250430 RECONSTRUCTION & WIDENING FROM 2 LANES T6:.4 LANES.

CONG DIST. 10

ROW LOCL

PROJECT MILEAGE : .91

CONST 1995

$ 2066

~~~:~ STATUS:

~~ii~T~A~i~NED/ROW AND UTILITIEi{ i:if!V,!!9.

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $ 1653

GA. SHARE $

413

210490 IS AN ASSOCIATED PROJECT.

0TH SHARE $

RICHMOND 250490
STATUS:

AUGUSTA TIP ff RC-7000 CONG.DIST. 11 & 10
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

$

39

ROW LOCL

CONST 1997

$

772

FED SHARE $

618

GA. SHARE $ 154

0TH SHARE $

RICHMOND WALTON WAY INTERSECT:ccil!~!;!:VEMENTs. WITH 13TH s~1tii~~~A

250550 INTERSECTION IMPROVEMENT/}\.SAFETY

.,.,,,,.,., .. ,.,:,:c,,=

=~;~:: ~:::~~;8Jf. PROJECT MILEAGE : . 56 - EX{ST. LANES: 6 /PROPOSl!:)t~ES: 7

STATUS,:

S~G~~Ii~~i!-92 FOR llQW/PJILITI~

AUGUSTA TIP ff RC-7027 CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1995

$

198

FED SHARE $

178

GA. SHARE $.

20

OTHSHARE $

RICHMOND PLEASANT HOME RD NORTH LEG OVER CSX RAILROAD

250570 BRIDGES/ RECST. OR REHAB.

DIST. 10

PROJECT MILEAGE : .00

MANAGER: D. CHURCH (M)

FUND SOURCE: SURFACE TRANSPORT.

STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP

f~p~RAJ.HIGHWAY ADMIN FUNDS

250560,:,::ts AN ASSOCIATED PROJECT.

r~~~~s ~;i,~ mtT~~!fc~ ~i RICHMOND
270880

1

~TO~:::::SED LANEsdf!I~*:.,;;;.~1 RC-ODOE

MANAGER: NEAL WILKES STATUS: TO BE DONE BY CONTRACT

F~6'.::~,~8t{ TRAN~, .EN~!:]) FEOERALiHIGHWAY AbMINtUNDS

PE ROW LOCL CONST

$

15

AFTER 97

PE 1995 $

20

ROW LOCL

CONST 1995

$

305

FED SHARE $ 244

GA. SHARE $

4

0TH SHARE $

65

RICHMOND COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1169 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH STATUS:

;JN~ souRci~!Ik&fu TRANSIT

~ 9
PPERATIN~E~ !~ARE

68 39

FEiiERAL.,Tfuili'tfT ADMIN FUNDS.,}:,:;:,, :

GA. SHARE $

0TH SHARE$

29

.RICHMOND COUNTY OPERATED PUBLIC TRANSIT SERVICE 2Bll70 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH STATUS:

.OPERATING 1996 $

71

FUND SOURCE: RURAtfilili;IT
FEDERAL TRANSIT .fillMlN FUNDS

FED SHARE.$

40

GA. SHARE $

0TH SHARE$

30

( ..

...........

=

a:~-....c.w

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

RICHMOND ONE CONVERSION VAN WITH LIFT 2C2169 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 10 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 33

FISCAL YEAR

COST ESTS

CAPITAL 1995

$

33

FED SHARE$

26

GA. SHARE$

4

0TH SHARE$

3

RICHMOND ONE CONVERSION VAN WITH LIFT 2C2170 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: RICHMOND MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

CONG DIST. 10 & 11

CAPITAL 1996

$

33

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

3

RICHMOND PURCHASE 5 TRANSIT 2D2011 TRANSIT PROJECTS/
FUNDS RECIPIENT: AUGUSTA MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

CONG DIST. 10 & 11

CAPITAL 1995

$

950

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

760

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

95

0TH SHARE$

95

RICHMOND PURCHASE 3 TRANSIT VEHICLES AND 2D2012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AUGUSTA PUBLIC MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

DIST. 10 & 11
SOURCE: URBAN TRANSIT TRANSIT ADMIN FUNDS

CAPITAL 1996

$

822

FED SHARE$

658

GA. SHARE $

82

0TH SHARE$

82

RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND 2D2014 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT-SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

1852 778
6
1068

RICHMOND PUBLIC TRANSIT SERVICE FOR AUGUSTA AND RICHMOND COUNTY 2D2015 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: AUGUSTA PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
RICHMOND ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 2V1020 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA MPO AREA MANAGER: STEVE KISH STATUS: NOT APPLICABLE

DIST. 19(f! SOURcti&l:M~
FED~_RAI, i~iT
CONG,~;!(0 &
FUND SOURCE: FEDERAL TRANSIT

1996 $ FED SHARE$ GA. SHARE$
0TH SHARE$

1963 785
2
1180

CAPITAL 1995

$

50

FUND FED SHARE$

40

GA. SHARE$

5

0TH SHARE$

5

COONTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 34

FISCAL YEAR

COST ESTS

RICHMOND ELDERLY AND DISABLED VEHICLES AND 2V1021 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN AUGUSTA MANAGER: STEVE KISH
STATUS: NOT APPLICABLE

CONG DIST. 10 &_ 11

CAPITAL 1996

$

52

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

42

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

5

0TH SHARE$

5

,,

,,

"

= = =

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

SCREVEN 231100
STATUS:

SR 17@ JACKSON BRANCH REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .33 MANAGER: D. GRIFFITH
SCREVEN COUNTY SIGNED 6/29/90 FOR

CONG DIST. 11
FUND SOURCE: BRIDGE-PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

~

- I

,,

22-Feb-1994 Page 35

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995

$

339

FED SHARE $

271

GA. SHARE $

68

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TALIAFER CR 80 OVER HARDEN CREEK NORTH OF 270800. REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH STATUS: TALIAFERRO SGN 4-3-92 FOR ROW,

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 36

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995

$

293

FED SHARE $ 234

GA. SHARE $

59

0TH SHARE $

TALIAFER CULVERT EXT@ VAR LOC 27087Z BRIDGES/ MAINTENANCE
PROJECT MILEAGE : .00 MANAGER: L. SEABROOK
STATUS:

PE NONE

$

0

CONG DIST. 2

ROW NONE

$

0

CONST 1995

$

0

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

270870 IS AN ASSOCIATED PROJECT.

0TH SHARE $

TALIAFER COUNTY OPERATED 2Bll79 TRANSIT FACILITIES
FUNDS RECIPIENT: MANAGER: STEVE KISH STATUS:

CONG DIST. 11

OPERATING 1995

$

39

FUND SOURCE: RURAL TRANSIT

FED SHARE $

21

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

18

TALIAFER COUNTY OPERATED PUBLIC TRANSIT SERVICE .2B1180 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH STATUS:

DIST. 11

OPERATING 1996

$

41

SOURCE: RURAL TRANSIT

FED SHARE $

23

TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

19

TALIAFER ONE STANDARD VAN 2C2179 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: TALIAFERRO MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

1995

$

20

FED SHARE$

16

GA. SHARE$

2

0TH SHARE$

2

,.

~

~ """""""'

=

~-;...0M.1::l:

~ ,--:

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TREUTLEN I-16 AT OVERPASS FOR GEORGIA 210610 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE: .00 MANAGER: GENE POWELL (M) STATUS: TREUTLEN COUNTY SIGNED 12-7-93

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 37

FISCAL .YEAR

COST ESTS

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1996 "$

578

FED SHARE $

520

GA. SHARE $

58

0TH SHARE $

TREUTLEN REPLACE BRIDGE CARRYING 222200 REHABILITATION OF THE
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH STATUS: TREUTLEN COUNTY SIGNED

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1994

$

5

CONST 1996

$ 1537

FED SHARE $ 1230

GA. SHARE $

307

0TH SHARE $

TREUTLEN SR 29@ RED BLUFF 222205 REHABILITATION OF
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH STATUS: TREUTLEN COUNTY SIGNED

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW NONE

UNDERWAY

$

0

I

CONST 1996

$

319

FED SHARE $

255

GA. SHARE $

64

0TH SHARE $

TREUTLEN COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1184 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: TREUTLEN MANAGER: STEVE KISH STATUS:

DIST. 8

OPERATING 1995 $

30

SOURCE: RURAL TRANSIT

FED SHARE$

18

TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

12

TREUTLEN COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1185 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: TREUTLEN MANAGER: STEVE KISH -STATUS:

$

32

SHARE$

19

GA. SHARE$

0TH SHARE$

13

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT. LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TWIGGS 22207X
STATUS:

SR 87 FM SR 112 TO SR 96 . SEE RECONSTRUCTION & _WIDENING. NO LANE PROJECT MILEAGE : 8.00 MANAGER: UNKNOWN

PROPOSED.

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 222070 IS AN ASSOCIATED PROJECT .

22-Feb-1994 Page 38

FISCAL YEAR

COST ESTS

PE 1992 ROW 1996 CONST

UNDERWAY

$

0

AFTER 97

..

"""""""'

~ ==

=

G~,~...-.t:.h..'.J

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WARREN 22157X
STATUS:

SR 17 FM CR 47/JEFFERSON TO MP UNKNOWN/ UNKNOWN PROJECT MILEAGE : MANAGER: UNKNOWN

CONG DIST. 11
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 221575 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 39

FISCAL YEAR

COST ESTS

PE ROW CONST

$

0

AFTER 97

AFTER 97

WARREN 222390
STATUS:

SR 16 OVER GOLDEN CREEK IN REPLACEMENT OF THE EXISTING PROJECT MILEAGE.: .00 MANAGER: D. GRIFFITH (M) SEND LGPA IN 1995

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1996

$

1

CONST 1997

$

738

FED SHARE $

590

GA. SHARE $

148

0TH SHARE $

WARREN 2B1189
STATUS:

COUNTY OPERATED TRANSIT FACILITIES FUNDS RECIPIENT: WARREN MANAGER: STEVE KISH

CONG DIST. 11

OPERATING 1995 $

41

FUND SOURCE: RURAL TRANSIT

FED SHARE$

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

17

WARREN 2B1190
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WARREN
MANAGER: STEVE KISH

DIST. 11

OPERATING 1996 $

43

SOURCE: RURAL TRANSIT

FED SHARE$

25

f.EP~R/\~. TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE$

18

WARREN 2C2189
STATUS:

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WARREN MANAGER: STEVE KISH LGPA NOT APPLICABLE

1995

$

32

FED SHARE$

26

GA. SHARE$

3

0TH SHARE$

3

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WASHINGT SR 15: NB MP 28.1-29.6/WASHINGTON//SB 222300 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 3.00 MANAGER: D. GRIFFITH (M) STATUS: REQ WASHINGTON DO UTILITIES 4/92;

1.0-2.5/HANCOCK

CONG DIST; 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 40

FISCAL YEAR

.COST ESTS

PE 1995 ROW CONST

$

45

AFTER 97

AFTER 97

WASHINGT SR 24 BET SANDERS'LE & 231240 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 2.60 MANAGER: D. GRIFFITH (M) STATUS: SEND LGPA WHEN PROJECT

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE ROW CONST

$

45

AFTER 97

AFTER 97

WASHINGT CR 357 AT STEEL 242150 REPLACEMENT OF THE
PROJECT MILEAGE : .00 MANAGER: D. GRIFFITH (M) STATUS: REQ CO DO PUB UTILITIES

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

6

AFTER 97

WASHINGT COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1504 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH.
STATUS:

WASHINGT COUNTY OPERATED PUBLIC TRANSIT SERVICE

2B1505 TRANSIT FACILITIES/ OPERATIONS

'

FUNDS RECIPIENT: WASHINGTON

MANAGER: STEVE KISH

STATUS:

WASHINGT ONE STANDARD VAN AND ONE MOBILE RADIO 2C2504 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

WASHINGT ONE STANDARD VAN AND ONE MOBILE RADIO 2C2505 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WASHINGTON MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

DIST. 11

OPERATING"l995 $

40

FUND SOURCE: RURAL TRANSIT

FED SHARE$

23

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

17

\\ .

Ois2: 41 ..C.O...N..G

/ .::: ..
. .. :.;:.:.;..

i&Jid'lL F~;

.OPERATING 1996 $

RURAL TRANS!' ()

FED SHARE$

47 27

. FEDERAL 'TRANSIT ADMIN FUNl:>S

GA. SHARE$

,:::'

0TH SHARE$

20

;-::-:-::
.. ~
idt6 SOURciffilt/fuu. TRANSIT
FEI>ERAL.,-TR:ANSIT ADMIN

1995

$

21

FED SHARE$

17

-GA. SHARE $

2

0TH SHARE$

2

CONG DIST.
FUND SOURCE: FEDERAL TRANSIT

CAPITAL 1996

$

21

FED SHARE $

17

GA. SHARE $

2

0TH SHARE $

2

l

., "

a:m=

I!!!!!!'.!!!!!'

t!'--

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WILKES 270960
STATUS:.

REVITALIZATION/LANDSCAPE HISTORIC DIST LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. MANAGER: C. HAMILTON LGPA TO BE DONE BY CONTRACT

CONG DIST. 11 & 10 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

WILKES 2Bll94
STATUS:

COUNTY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: WILKES MANAGER: STEVE KISH

CONG DIST. 10 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

WILKES 2B1195
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: WILKES MANAGER: STEVE KISH

CONG DIST. 10 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

WILKES 2C2194
STATUS:

ONE STANDARD.VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILKES MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 10 & 11
SOURCE: RURAL TRANSIT F.~1/~.~~. TRANSIT ADMIN FUNDS

WILKES 2C2195
STATUS:

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILKES MANAGER: STEVE KISH LGPA NOT APPLICABLE

22-Feb-1994 Page 41

FISCAL YEAR

COST ESTS

PE LOCL

ROW NONE $

0

CONST 1995 $ 500

FED SHARE $

400

GA. SHARE $

0TH SHARE $ 100

OPERATING 1995 $

53

FED SHARE$

31

GA. SHARE$

0TH SHARE$

22

OPERATING 1996 $

55

FED SHARE$

32

GA. SHARE$

0TH SHARE$

23

CAPITAL 1995

$

20

FED SHARE$

16

GA. SHARE$

2

0TH SHARE$

2

1996

$

32

FED SHARE$

26

GA. SHARE$

3

0TH SHARE$

3

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 42

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

---------------------------- ------------------------------------------------------------------------------------------------------

WILKINSO US 441@ SOUTHERN RR & COMMISSIONERS

PE 1992

UNDERWAY

221764 REHAB, OF THE EXISTING BRIDGE (S).

LANES.

CONG DIST. 11

ROW NONE

$

0

PROJECT MILEAGE : .00

GRIP PROJECT

CONST 1997

$

605

MANAGER: M. REYNOLDS

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

484

STATUS: REQ MCINTYRE DO UTIL 6-3-92;

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 121

221760 IS AN ASSOCIATED PROJECT,

0TH SHARE $

WILKINSO SR 29/US 441@ .BLACK CREEK

221935 REPLACEMENT OF THE EXISTING

PROJECT MILEAGE : ,00

MANAGER: M. REYNOLDS

STATUS:

WILKINSON REFUSED

CONG DIST. 11 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 221930 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1996

$

161

FED SHARE $ 129

GA. SHARE $

32

0TH SHARE $

WILKINSO COUNTY OPERATED 2B1199 TRANSIT FACILITIES
FUNDS RECIPIENT: MANAGER: STEVE KISH STATUS:

CONG DIST. 11

OPERATING 1995 $

32

FUND SOURCE: RURAL TRANSIT

FED SHARE$

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

WILKINSO COUNTY OPERATED PUBLIC TRANSIT SERVICE 2B1200 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: WILKINSON MANAGER: STEVE KISH STATUS:

OPERATING 1996 $

33

SOURCE: RURAL TRANSIT

FED SHARE$

19

TRANSIT ADMIN FUNDS

GA, SHARE$

0TH SHARE$

14

WILKINSO ONE CONVERSION VAN WITH LIFT AND ONE MOBILE 2C2199 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: WILKINSON MANAGER: STEVE KISH STATUS:. LGPA NOT APPLICABLE

1995

. $

33

FED SHARE$

26

GA. SHARE$

4

0TH SHARE$

3

l!!l!!!!:!m

~

~

~

~

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

ALL 315095
STATUS:

LUMP SUM MAINTENANCE ON PRINCIPAL ARTERIAL FOR FY
~;g~c~I~~~E!G~~u~/-~!~;~~~~ES: 0 )#~QPOSED LANES: 0 MANAGER: L. SEABROOK LGPA NOT APPLICABLE

CONG DIST, 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

ALL 315096
STATUS:.

< LUMP SUM MAINTENANCE ON PRINCIPAt{:ktH\@:iAL FOR FY =S. .. MPRINOOJERCWTIMDEINLEA&GREES: UR.F0 0 / _.MAEXINITSE.T_N'.'".!\N.: t,E]S}'./ 0 /PROPOSED L:A: NES: 0
MANAGER: L. SEABROOK LGPA NOT APPLICABLE

:>

ALL 315097
STATUS:

LUMP SUM MAINTENANCE 6&!fi~NCIPAL ARTERI.hl. FOR FY./ MINOR WIDEN & RESURF / MAINTENANCE PROJECT- MILEAGE : . 00 - EXIST. LANES: 0 /PROPO$iP.}tJJfas: 0 MANAGER: L. SEABROOK LGPA NOT APPLICABLE

CONG DIST. 99 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 99 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

ALL 315L95
STATUS:

LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYS

~it; SIGNING/ SAFETY

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSEJ::>::

0

MANAGER:

LGPA NOT APPLICABLE

'dONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

tu;L
315L96
STATUS:

LUMP SUM INSTALL LOGO SIGNS ON NATIONAL HWY SYSfi:M - 1996
SIGNING/ SAFETY
PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANESf cf\//
MANAGER: LGPA NOT APPLICABLE

,))~QijG Disi#:fo9

"::;.;.:.

.

FUND)ifoilii2t: NAT'L. HIGHWA'.\
FEotffl itiGHwAY .AbH:rn)ii:rnbs

ALL 315L97
STATUS:

LUMP SUM LOGO SIGNS ON NHS FOR FY 97

SIGNING/ SAFETY

.

PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

LGPA NOT APPLICABLE

\': :QNG DIST.
itAfo souRc1n::w1;;-, L HIGHWAY
FEDE:~ ..fffoft#j(y ADMIN

ALL 315095
STATUS:

LUMP SUM.INTERCHANGE/ROADWAY LIGHTING FOR FY 1995
LIGHTING/ MAINTENANCE PROJECT MILEAGE : ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN .

CONG DIST. '=':99 FUND souRcE = NAT'.tnH&iiwAY
FEDERAL HIGHWAY Jilit.fi:N FUNDS

22-Feb-1994 Page 1

FISCAL YEAR

COST ESTS

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 30000 24000 6000

PE NONE

$

ROW NONE

$

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 30000 24000 6000

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

'
0 0 30000 24000 6000

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

100

FED SHARE $

80

GA. SHARE $

20

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST 1996

$

100

FED SHARE $

80

GA. SHARE $

20

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

/CONST 1997

$

100

FED SHARE $

80

GA. SHARE $

20

0TH SHARE $

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 1000 800 200

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

ALL 315096
STATUS:

LUMP SUM INTERCHANGE/ROADWAY LIGHTING

LIGHTING/ MAINTENANCE

.

PROJECT MILEAGE : .00 - EXIST. LANES:

MANAGER: UNKNOWN

CONG DIST. 99
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 2

FISCAL YEAR

COST ESTS

PE NONE $ ROW NONE $ CONST 1996 $
FED' SHARE $ GA. SHARE $ 0TH SHARE $

0 0 1000
800 200

ALL 315097
STATUS:

LUMP SUM INTERCHANGE/ROADWAY LIGHTING/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER:

CONG DIST. 99
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE $

CONST 1997 $

FED SHARE $'

GA. SHARE $

0TH SHARE $

0 0 1000 800
200

ALL 33A095
STATUS:

LUMP SUM SAFETY UNKNOWN/ SAFETY PROJECT MILEAGE : MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE' $ ROW NONE $
CONST 1995 $ FED SHARE $ GA. SHARE $ 0TH SHARE $.

0 0 1000 900 100

ALL 33A096
STATUS:

LUMP SUM SAFETY "OPTIONAL" FOR FY96 UNKNOWN/ SAFETY PROJECT MILEAGE: .00 - EXIST. LANES: MANAGER: LGPA NOT APPLICABLE

DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 1000 900 100

ALL 33A097
STATUS:

LUMP SUM SAFETY "OPTIONAL" FOR FY97

UNKNOWN:/ SAFETY

{=(CONG

ffi~~t': Ji:() PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES{(Q)\}'

MANAGER:

FUl-1;:::

HWY .J,~AFE'fg::

LGPA NOT APPLICABLE

FEDE~i::liIGHWAY Ab~:rn_}tO.NPS .

PE NONE $

ROW NONE $

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0
0 1500 1350
150

ALL ., LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F
33C095 MINOR WIDEN & RESURF / MAINTENANCE PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:
STATUS: LGPA NOT APPLICABLE

PE NONE

$

0

i \ }ONG DIST. 9.9/'

ROW NONE

$

0

::::J~:~~~~i.w.,i!l~~;~NT~;~i,r:; 1 : :m:toNsi:~ 9i~::

2500 2000

500

0TH SHARE$

ALL

LUMP SUM MAINTENANCE FOR AREAS POP> 200,000 FOR F

33C096 MINOR WIDEN & RESURF / MAINTENANCE

PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER:

STATUS: LGPA NOT APPLICABLE.

CONG DIST.:::99 FUND SOURCE: SURFA8~~sPORT.
FEDERAL HIGHWAY J$M:f~ FUNDS

PE NONE

$

ROW NONE

$

CONST .1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 7500 6000 1500

~ !l'l!!!.!fflffl

&,=9

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

ALL 33C097
STATUS:

LUMP SUM MAINTENANCE FOR AREAS POP> MINOR WIDEN & RESURF / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99 0
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

ALL 33CB95
STATUS:

LUMP SUM BRIDGE PAINTING BRIDGES/ MAINTENANCE PROJECT MILEAGE : ,00 MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

ALL 33CB96
STATUS:

LUMP SUM BRIDGE BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

ALL 33CB97
STATUS:

LUMP SUM BRIDGE PAINTING "33C" FOR FY BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

DIST. 99
SOURCE: SURFACE TRANSPORT. ADMIN FUNDS

ALL 33D095
STATUS:

LUMP SUM MAINTENANCE FOR "ANY AREA" FOR

!& MINOR WIDEN & RESURF / MAINTENANCE
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES.f

MANAGER:

.

LGPA NOT APPLICABLE

ALL 33D096
STATUS:

LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 96 MINOR WIDEN & RESURF / MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LGPA NOT APPLICABLE

}CONG DIS'.1:'i/@9

sB6foie FUND

= suRFAcE T~11:8k4''?

FEDl!ifilili,Jh:GHWAY Ariij:i:N:\fij#ps

.,:::::::::::::::::::::::::,::

99)
:;t1
FUND souRcil AD

ALL 330097
STATUS:

LUMP SUM MAINTENANCE FOR "ANY AREA" FOR FY 97 MINOR WIDEN & RESURF / MAINTENANCE PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LGPA NOT APPLICABLE

CONG DIS;'''.'\::99

ADMIN FUND souRcE: suRFKtt/4kANsPORT.

FEDERAL HIGHWAY

FUNDS

22-Feb-1994 Page 3

FISCAL YEAR

COST ESTS

PE NONE $

ROW NONE $

CONST 199=7

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 7500 6000 1500

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 4000
3200 800

PE NONE

$

ROW NONE

$

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 4000 3200 800

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 3750 3000 750

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 10000 8000 2000

PE NONE

$

ROW NONE

$

/CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 13400 10720 2680

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 13000 10400 2600

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 4

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------------------------------------------------- .---------------------------------------------------------------------

ALL

LUMP SUM BRIDGE PAINTING "33D" FOR

PE NONE

$

0

33DB95 BRIDGES/ MAINTENANCE

CONG DIST. 99

ROW NONE $

0

PROJECT MILEAGE : .. 00

CONST 1995 $ 3000

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 2400

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY. ADMIN FUNDS

GA. SHARE $

600

0TH SHARE $

ALL 33DB96
STATUS:

LUMP SUM BRIDGE PAINTING BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

s CONST 1996 $ FED SHARE

GA_. SHARE $

0TH SHARE $

o
0 5000 4000
1000

ALL 33DB97
STATUS:

LUMP SUM BRIDGE BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1997 $

FEDSHARE $

GA. SHARE $

0TH SHARE $

0 0 3500 2800 700

ALL 33DL95
STATUS:

LUMP SUM iNSTALLATION SIGNING/ SAFETY .
PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: LGPA NOT APPLICABLE

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

50

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $

40

FED~SAJ, HIGHWAY ADMIN FUNDS

GA .. SHARE $

10

0TH SHARE $

ALL . 33DL96
STATUS:

LUMP SUM INSTALLATION OF LOGO SIGNS "1996"

SIGNING/ SAFETY

PROJECT MILEAGE : .00 EXIST. LANES: 0 /PROPOSED LANESi/:0//:::e:

MANAGER: LGPA NOT APPLICABLE

f

:c:QNG Distrn:~9
16WdJ: SURFACE T~1ifoiT: .illi~rn::tilit6s

PE NONE $"

0

ROW NONE

$

0

CONST 1996 $

50

FED SHARE $

40

GA. SHARE $

10

0TH SHARE $

ALL

LUMP SUM LOGO SIGNS FOR 1997

0

33DL97 SIGNING/ SAFETY

0

PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

50

MANAGER:

40

STATUS: LGPA NOT APPLICABLE

10

ALL 33MS95
STAT~S:

LUMP SUM RRX PROTECTION DEVICES "33M" FOR FY 95 RR XING / SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: W HESTER LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE : HWY jJ:li/,~f~ -
FEDERAL HIGHWAY ADMII't FUNDS :-:-;.:-.-:--.-;

PE NONE

$

ROW NONE

$

CONST 1995 $

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0
34.00 3060
340

l!!m!m ~ l!!!!!!\!fflJ

~

~

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

ALL 33MS96
STATUS:

LUMP SUM RRX PROTECTION DEVICES "33M" RR XING / SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: W HESTER LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 5

FISCAL YEAR

COST ESTS

PE NONE $

ROW NONE

$

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 3026 2723 303

ALL 33MS97
STATUS:

LUMP SUM RRX PROTECTION RR XING / SAFETY PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

/PROPOSED

CONG DIST. 99
0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE $

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 3026 2723 303

ALL 33NS95
STATUS:

LUMP SUM RRX HAZARD RR XING / SAFETY PROJECT MILEAGE : .00 MANAGER: W HESTER LGPA NOT APPLICABLE

CONG DIST. 99
0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE $

0

CONST 1995

$

720

FED SHARE $

648

GA. SHARE $

72

0TH SHARE $

ALL 33NS96
STATUS:

LUMP SUM RRX HAZARD ELIMINATION "33N" RR XING / SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: W HESTER LGPA NOT APPLICABLE

DIST. 99
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
((f':

PE NONE

$

ROW NONE $

CONST 1996

$

FED SHARE $

GA. SHARE $

OTH.SHARE $

0 0 2488 2239 249

ALL 33NS97
STATUS:

LUMP SUM RRX HAZARD ELIMINATION "33N"

RR XING / SAFETY PROJECT MILEAGE :

. 00

-

EXIST.

LANES:

0

/PROPOSED LANESi, :&%\,:,,

MANAGER:

LGPA NOT .APPLICABLE

FUNo:::s-awci = HWY., sAFETt', '}" FEOJtffi,itfoHWAY ADMIN

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

,,:-;-:-:,:-:,;:-:::,:>::-:;:.:--

GA. SHARE $ 0TH SHARE $

0 0 3026 2723 303

ALL 3AA095
STATUS:

LUMP SUM MAINT. FOR AREA POP BT SK - 200K FOR FY 1995 MINOR WIDEN & RESURF / MAINTENANCE PROJECT MILEAGE: .00 - EXIST. LANES:, 0 /PROPOSED LANES: 0 MANAGER:
LGPA NOT APPLICABLE

\/86NG DIST. 9$1:,:)
idNo sou~gt}(}jtH~FACE TRANSPOR'r}
FEiiERALdtti3liWAY ADMIN

PE NONE

$

ROW NONE

$

ii,'CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 12500 10000 2500

ALL

LUMP SUM MAINT. FOR AREA POP BET 5,000-200,000 FOR FY 96

PE NONE

$

0

3AA096 MINOR WIDEN & RESURF / MAINTENANCE

CONG DIST. \99

ROW NONE $

0

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STATUS: LGPA NOT APPLICABLE

ADMIN FUND souRcE: sURFAti:filANsPoRT.

FEDERAL HIGHWAY

FUNDS

CONST 1996 $ 10000 FED SHARE $ 8000 GA. SHARE $ 2000

I

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 6

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------- ----- ~---------------------------------------------------------------------------------------------------------

ALL

LUMP SUM MAINT. FOR AREA POP BET 5,

FOR FY 97

PE NONE

$

0,

3AA097 MINOR WIDEN & RESURF / MAINTENANCE

CONG DIST. 99

ROW NONE

$

0

PROJECT MILEAGE : .00 - EXIST. LANES:: 0

CONST 1997

$ 10000

MANAGER:

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 8000

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 2000

0TH SHARE $

ALL 3AAB95
STATUS:

LUMP SUM BRIDGE PAINTING BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1995 $

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 3000 2400 600

ALL 3AAB96
STATUS:

LUMP SUM BRIDGE BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PENONE

$

ROW NONE

$

CONST 1996 $

FED SHARE$

GA. SHARE$

0TH SH,ARE $

0 0 2500 2000 500

ALL 3AAB97
STATUS:

LUMP SUM BRIDGE PAINTING "3AA" FOR FY BRIDGES/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

DIST. 99
SOURCE: SURFACE TRANSPORT. HIG~WAY ADMIN FUNDS-

PE NONE $

ROW NONE

$

CONST 1997 $

FED SHARE"$

GA. SHARE$

0TH SHARE$

0
0 3000 2400
600

~


~

COUNTY P .I.NO.

DESCRIPTION PRO.:,ECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BIBB 310980
STATUS:

I-16@ SR 540 INCL I-16 ML BR@ SAL INTERCHANGE/ RECST. OR _REHAB. PROJECT MILEAGE : .97 - EXIST. MANAGER: BEN BUCHAN LGPA SIGNED BY CO 4-16-85 FOR

& 1 RIVER

MACON TIP# llOC-MC CONG DIST. 8 GRIP PROJECT FUND _SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS

BIBB 311460
STATUS:

I-75@ HARTLEY BRIDGE RD/CR INTERCHANGE/ RECST. OR PROJECT MILEAGE : .00 MANAGER: BEN BUCHAN (M)
COUNTY REFUSED 11-17-92 .c,\C?~Z:%cc

MACON TIP# 271-TSM CONG DIST. 8
2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

BIBB 311530
STATUS:

I-16@ SR 87/MLK JR.

LANDSCAPING/

NC:EMJ~N~f),.

PROJECT MILEAGE : .00 -

MANAGER: E. LAWS

LGPA NOT APPLICABLE

MACON TIP i 250-TSM
CONG DIST. 8
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

BIBB 311580
STATUS:

I-475 AT REST AREA# 19, MP 7.7 NB REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: J. GARLAND N9T APPLICABLE

DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

BIBB 311590
STATUS:

I-475 FM I-75 TO SR-19/US 41/MONROE

.....

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, S'I'.Rift di%i:LcoNG PROJECT MILEAGE : 14. 00 - EXIST. LANES: 2 /PROPOSED LANES!)i:: ....... .

MANAGER: L. SEABROOK LGPA NOT APPLICABLE

I-STATE MAt,irnr
AbMm fti~bif

BIBB 311670
STATUS:

I-475, SEWER SYSTEM IN REST AREAS REST AREA/ MAINTENANCE PROJECT MILEAGE : .10 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK
NOT APPLICABLE

tf:BbNG
FUND SOURc:i{\:k;ATE
FEDERAL . -it!c;ft#j{y

BIBB 311750
STATUS:

NAPIER AVE OVER I-75; I-75 OVER RAMP TO SR 87
BRIDGES/ RECST~ OR REHAB. PROJECT MILEAGE : .00 MANAGER: BEN BUCHAN (M) REQ MACON DO UTIL 10-7-93; BIBB SGN 10-20-93 PUBLIC UTIL

CONG DIST:\8 & 2
FUND SOURCE: FEDERAL HIGHWAY

22-Feb-1994 Page 7

FISCAL YEAR

COST ESTS

PE 1987 UNDERWAY

ROW 1989 UNDERWAY

CONST 1997

$ 22468

FED SHARE $ 17974

GA. SHARE $ 4494

0TH SHARE $

PE 1992 ROW 1997 CONST

UNDERWAY $ 5000 AFTER 97

PE NONE $

0

ROW NONE $

0

CONST 1995

$

70

FED SHARE $

56

GA. SHARE $

14

0TH SHARE $

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1995 $ 2000

FED SHARE $ 1800

GA. SHARE $

200

0TH SHARE $

PE 1993 UNDERWAY

ROW NONE $

0

CONST 1995 $ 4790

FED SHARE $ 4311

GA. SHARE $

479

0TH SHARE $

PE NONE $

0

ROW 1994

$

0

1995

$

100

FED SHARE $

90

GA. SHARE $

io

0TH SHARE $

PE 1995 $

10

ROW 1995

$

1

CONST 1996

$

319

FED SHARE $

287

GA. SHARE $

32

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

-Page 8

-PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-------------------------------------------------------------------------------

BIBB

HOUSTON RD FM WALDEN/SARDIS CH RDS TO Slt. 11

MACON

-T-I-P--f--1-5-0--M--C----------------------P-E--1-9-9-2-----U-N-D-ER-W--AY

350820 MINOR WIDEN & RESURF / RECST. OR REHAB. \\,

CONG DIST. 8

ROW LOCL

PROJECT MILEAGE : 3.20 - EXIST. LANES: 2,\/!>ROPOSED LANES: 2

CONST 1997

$

757

MANAGER: GORDON BROWN(M)

fj)}.

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE$

606

STATUS: BIBB COUNTY SIGNED ROW, UTILITIES & D?!PtiRS\11:,,,17-92

FEDERAL HIGHWAY ADMIN FONDS

GA. SHARE$

151

0TH SHARE$

BIBB 350960
STATUS:

,:fWtl~R SR 74 FM W/I-475 TO COLUMBUS RD_

OVER I-:it;h

TURN LANES/ SAFETY

PROJECT MILEAGE : 1. 30 - EXIsj{;'\iliis: 4 /PROPOSED iJfuEs: 5

MANAGER: BEN BUCHAN

REQ MACON DO UTILITIES lQfi~t:~iP COUNTY REFUSED

MACON TIP f 339-MC
CONG DIST. 8 & 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 ROW 1997 CONST

UNDERWAY

$

110

AFTER 97

BIBB 371030
STATUS:

'sdv~ LANDSCAPING OF CIVIC

FOR PARK IN MACON

LANDS CAP ING / ENHANCEMEN'i'\. .

MPRAONJAEGCETR: MCILOERAAGECOO: K . 00 - idtf.s---T . LANES: 0 /PROPO. -s---l-!---:-.:6.., w.ill:is: 0

TO BE DONE BY CONTRACT

BIBB 371320
STATUS:

PEDESTRIAN PLAZA TO GEORGIA MUSIC BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: UNKNOWN

BIBB 3Vl0ll
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN BIBB MPO AREA MANAGER: STEVE KISH.

BIBB 3Vl012
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIE IN BIBB MPO AREA MANAGER: STEVE KISH

CONG DIST. 2 & 8 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
DIST. 2

PE 1995

$

60

ROW LOCL

CONST 1995 $ 240

FED SHARE $

192

GA. SHARE $

12

0TH SHARE $

60

PE LOCL
ROW LOCL
CONST 1995 $ FED SHARE $ GA. SHARE $ 0TH SHARE $

1250 1000
250

}GONG Dis=;@ij & 2

ELDERLY

& ,l'>iMMiilb

~:;TAL

1995

$

FED SHARE$

39 31

Jili~-~~ &os

GA. SHARE$

4

0TH SHARE$

4

i/' 'j}k:ONG DIST. 8.
FUND souRciiiVii:6ERLY &
FEDERAL -:TRANSIT ADMIN

1996

$

41

FED SHARE$

33

GA. SHARE$

4

0TH SHARE$

4

111!!1:!!!!1 1!11!1'!1::!11

l!l!ffl!l!!!


mmm

~

cm=:, fflm

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BUTTS 311380
STATUS:

I-75@ SR 36 FM 0.5 MI SW/I-75 TO 0.55 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : 1.10 - EXIST. LANES: MANAGER: B FERGUSON (C) DPT TP [AU 1-19-94

CONG DIST. 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

BUTTS 332060
STATUS:

SR 16 OVER YELLOW WATER CREEK REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: GORDON BROWN REQ BUTTS COUNTY DO

CONG DIST. 11
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 9

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1994

$ 10181

CONST 1996

$ 4577

FED SHARE $ 4119

GA. SHARE $

458

0TH SHARE $

PE 1994 UNDERWAY

ROW 1995

$

1

CONST 1996

$

741

FED SHARE $

593

GA. SHARE $

148

0TH SHARE $

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CARROLL 350660
STATUS:

CS 824/STEWART ST/CARROLLTON@ CURTIS REHABILITATION OF THE EXISTING BRIDGE PROJECT MILEAGE : ,25 MANAGER: BILL MCVEY CARROLLTON PREV SGN 3-20-92 ROW &

LANES.

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 10

FISCAL YEAR

COST ESTS

PE 1991 UNDERWAY

ROW LOCL

CONST 1996 $ 303

FED SHARE$ 242

GA. SHARE$

61

0TH SHARE$

ll!l!!!!m!il

!!l.!!ffl!!

~

~

f>\.>. PAN

~

'l

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CHATTAHO SR 1 @ HICHITEE CREEK

..

321580 REPLACEMENT OF THE EXISTING BRIDGES (S). <NQ. ADDED LANES.

PROJECT MILEAGE : .30

STATUS: ~t~~~~T~ c~iN~~~;LSib; LGPA NOT APPriBlmifh

CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322160 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 11

FISCAL YEAR

COST ESTS

PE 1990 UNDERWAY

ROW NONE

$

0

CONST 1996

$

865

FED SHARE $

692

GA. SHARE $

173

0TH SHARE $

~tKv12i> CHATTAHO COUNTY OPERATED PUBLIC TRANSIT
3Bl204 TRANSIT FACILITIES / OPERATIO.N,~f' :: FUNDS RECIPIENT: CHATTAHOOCHEE/?}':::':':'= MANAGER: STEVE KISH
STATUS:

CONG DIST. 2

OPERATING 1995 $

41

FUND SOURCE: RURAL TRANSIT

FED SHARE $

23

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

18

CHATTAHO COUNTY OPERATED PUBL~a(;filfuSIT SERVICE 3Bl205 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CHATTAHC>OQH,EE MANAGER: STEVE KISH STATUS:

CONG DIST. 2

OPERATING 1996

$

43

FUND SOURCE: RURAL TRANSIT

FED SHARE $

24

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

19

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 12

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

C-PL-A-. YI-.T-NO-ON--. --I--7-5--F-M---I--6-7-5--P-TOR-O--SJER-C-T-7~/UD-SA-T-A4-1-/H-E-N--R-Y-----------------L-I-G-H-T-I-N-G-)--------A-T-L-A-N-T-AC-O-MT-MI-P-EN-fT-S-C-L---R--1-2-------------------P-EY-E-A1-R9-9-6------$-E-S-T-S--0

31097X WALLS/ RECST. OR REHAB.

CONG DIST. 3

ROW NONE

$

0

PROJECT MILEAGE: 7.80 - EXIST.

CONST

AFTER 97

MANAGER:

FUND SOURCE: NAT'L HIGHWAY

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

310976-IS AN ASSOCIATED PROJECT.

. .. ,

"

111!11!!!11!!1

~

~

~

~

~
0

~

COUNTY P,I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COWETA 31171W
STATUS:
COWETA 321310
STATUS:

CALL BOXES ON I-85 FM ALABAMA TO SR 74/FtJLTON .. SEE HARRIS
~~~~ ,I~~:Gio~s:~gc:::r~~IST. LANES: 0 ;,~()POSED LANES: 0
MANAGER: BURT RIDDLE

;~;~i.ss:-
~~:;I~fiiff~o SR 16, US 27 ALT FM EVANS
RECONSTRUCTION & WIDENING

PROJECT MILEAGE : 1.33

MANAGER: GORDON BROWN

.....-:-:--.:-::.

COWETA COUNTY SIGNED. FOR qffzjf'Jifi;s 11/7 /89,

CONG DIST. 7 & 3 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 3 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

COWETA 321450
STATUS:

SR 14/ us 29A/ GREENVt:tiiM ST @ A&WP RR REHAB. OF THE EXISTING B~JpGE(S). FROM 2 LANES Td',:41:~ES. PROJECT MILEAGE : .34 MANAGER: GORDON BROWN COUNTY SGN 7-20-88 FOR UTILitf:ti:;} C::ITY LGPA N'<f.ii/iJ?~irCABLE.

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COWETA 322390
STATUS:

SR 34/NEWNAN FM SR 34 BYP TO I-85 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6
PROJECT MILEAGE : 1.25
RJtJusti:r MANAGER: M. REYNOLDS
NEWNAN SGN 12-7-92 PUBLIC UTILITIES; COUNl'X. ..,. .-: .... 12-10-92

DIST. 3
FUND SOURCE: SURFACE TRANSPORT. -F:-:-EDERAL HIGHWAY ADMIN FUNDS

COWETA 322400
STATUS:

SR 34 BYP/NEWNAN FROM SR 70/INCLUDE CSX RR BRii&t TO

34

RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. SR

PROJECT MILEAGE : 3. 35

MANAGER: M. REYNOLDS (C)

NEWNAN SGN 12-7-92 UTILITIES; COUNTY REFUSED 12-10-92

\\
. \})\coNG DI$i::~: 3
FUNo::;amnfa = suRFACE TR1illi1i!Mif: FED~.)jhGHWAY AOMINiFfu.t6if

22-Feb-1994 Page 13

FISCAL YEAR

COST ESTS

PE

$

0

ROW NONE

$

0

CONST 1997

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1993

UNDERWAY

ROW 1993 UNDERWAY

CONST 1995

$

683

FED SHARE $

546

GA. SHARE $

137

0TH SHARE $

PE 1986 UNDERWAY

ROW 1994

UNDERWAY

CONST 1996

$ 1215

FED SHARE $

972

GA. SHARE $

243

0TH SHARE $

PE 1992

UNDERWAY

ROW 1995

$

17

CONST 1997

$

905

FED SHARE $

724

GA. SHARE $

181

0TH SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY

$

559

AFTER 97

COWETA 331730
STATUS:

CR 555 OVER MESSIERS CREEK NORTH OF JCT SR 14. REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C) COWETA SGN DO ROW, UTILITIES, DETOURS & PE 10-19-93

COWETA 331740
STATUS:

CR 301/SHADY GROVE CH. RD@ WAHOO CREEK 5.8 MI NW OF NEWNAN REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .22 MANAGER: GORDON- BROWN(C) SEND LGPA 10/94

FOND souRcEk liHHDGE PROGRAM
FEDERAL Jifoifr'l'AY ADMIN

CONG DIST. \3

ADMIN FUND SOURCE: BRIDGE);t~:~

FEDERAL HIGHWAY

FUNDS

PE LOCL

ROW LOCL

:(CONST 1995

$

137

FED SHARE $

110

GA. SHARE $

27

0TH SHARE $

PE 1995

$

10

ROW LOCL

CONST 1997

$

400

FED SHARE $

320

GA. SHARE $

80

0TH SHARE $

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COWETA 331920
STATUS:

CR 547/GORDON RD@ LITTLE WHITE OAK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: GORDON BROWN
COWETA COUNTY SIGNED

& DETOURS.

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 14

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW LOCL

CONST 1995

$

341

FED SHARE$

273

GA. SHARE$

68

0TH SHARE$

COWETA 332090
STATUS:

SR 74/85@ KEG CREEK EAST OF ADDITION OF A PASSING LANE. _PROJECT MILEAGE : . 30 MANAGER: GORDON BROWN SEND LGPA IN 1995

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 33Y090 IS AN ASSOCIATED PROJECT.

PE 1994 UNDERWAY

ROW 1997

$

5

CONST 1997

$

110

FED SHARE $

88

GA. SHARE $

22

0TH SHARE $

COWETA 332170
STATUS:

SR 14/US 29 INTERSECTION PROJECT MILEAGE: .00 MANAGER: GORDON BROWN(M) SEND LGPA IN 199

CONG DIST. 3
3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1996 $

58

CONST 1997 $.

83

FED SHARE$

75.

GA. SHARE$

8

0TH SHARE$

COWETA 332180
STATUS:

SR 16 AT SR 54 INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: GORDON BROWN(M) SEND LGPA IN 199

DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE- $.

0

ROW 1996

$

42

CONST 1997

$

83

FED SHARE"$

83-

GA. SHARE $

. 0TH SHARE $

COWETA 33Y090
STATUS:

SR 74/85@ KEG CREEK E OF SENOIA-FOR UNKNOWN / UNKNOWN .
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED MANAGER:

FUNo:=m:mi&i: BRIDGE PRO~~=/'
FED~dfrGHWAY ADMINif~bs . --
3_32d.6)is AN Assocfifa,ii:fi=:fi~.OJECT.)

PE 1994 UNDERWAY

ROW NONE

$

0

CONST 1997

$

120

FED SHARE $

96

GA;, SHARE $

24

0TH SHARE $

COWETA 342830
STATUS:

CR 252/SMOKEY ROAD OVER MOUNTAIN CREEK OVERFLOW REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C) COWETA SGN DO ROW, UTILITIES, DETOURS & PE 10-19-93

--:-:-:
',}'\CONG DIST.
-=-:t::i:~)}::;:;:;,:,
FUND SOURci:{:~ii'DGE PROGRAM FEDERALi!foftwAY ADMIN

PE LOCL

ROW LOCL

:::::::{tbNST 1996

$ 102

FED SHARE $

82

GA. SHARE $ 20

OTH SHARE $

COWETA 342900
STATUS:

CR 251/WAGERS MILt ROAD@ WAHOO CREEK 7.6 MI NW OF NEWNAN

REPLACEMENT OF _THE EXISTING BRIDGES (S) . NO ADDED LANES.

PROJECT MILEAGE : .22

MANAGER: GORDON BROWN(C)

SEND LGPA 10/94

-

CONG DIST.\3.
~~~~~u!i~~w!~Ii!~!f~~~

PE 1995 $

11

ROW LOCL

CONST 1997

$

440

FED SHARE $ 352

GA. SHARE $

88

0TH SHARE $

~

~

~

fg\-Jl

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COWETA 350980
STATUS:

SR 34 AT FIVE EXISTING MEDIAN OPENINGS
TURN LANES/ SAFETY PROJECT MILEAGE : .00 - EXIST. MANAGER: GORDON BROWN(M) "SEND LGPA IN 199

CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 15

FISCAL YEAR

COST ESTS

PE 1994 UNDERWAY

ROW 1996 $

1

CONST 1997

$

624

FED SHARE $

562

GA. SHARE $

62

0TH SHARE $

COWETA 370781
STATUS:

CR 157/ROCKAWAY RD IN SENOIA REPLACEMENT OF THE EXISTING c~~1/'~~-~,1 PROJECT MILEAGE : .30 MANAGER: GORDON BROWN CITY OF SENOIA SIGNED

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$

374

FED SHARE$ 299

GA. SHARE$

75

0TH SHARE$

COWETA 370824
STATUS:

CR 74/STALLINGS ROAD REPLACEMENT OF THE PROJECT MILEAGE : .19 , MANAGER: GORDON BROWN(C) SEND LGPA 10/94

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 $

8

ROW LOCL

CONST 1996

$

150

FED SHARE $

120

GA. SHARE $

30

0TH SHARE $

COWETA 370825
STATUS:

CR 252/SMOKEY RD OVER MOUNTAIN CK NE OF .REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .25 MANAGER: GORDON BROWN(C) COWETA SGN DO ROW, UTILITIES, DETOURS &

DIST.. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996

$

266

FED SHARE $ 213

GA. SHARE $

53

0TH SHARE $

COWETA 370826
STATUS:

CR 74/STALLINGS ROAD@ KEG CREEK 1.5 MIN OF REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .21 MANAGER: GORDON BROWN(C) SEND LGPA 10/94

:{CONG Disif[j ~~~~ll~tw:~I~~I:t~zi:>

PE 1995 $

8

ROW LOCL

CONST 1997

$

300

FED SHARE $

240

GA. SHARE $

60

0TH SHARE $

COWETA 370910
STATUS:

CR 157@ LINE CRK & LINE CRK OFLW ... ALSO FAYETTE CO REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: GORDON BROWN
COWETA & P'TREE CITY SGN 8/91 ROW/UTIL/DETOURS;FAYETTE N/A

PE 1992 UNDERWAY

ROW LOCL

::ARE i FciNo souRcil1::gif~GE PROGRAM\:

:

9 ,;: t:oNs;E~

11
fl;I!: ~!:: i ~~g~~f:~l~!~s~~i~E;u:~~mi8

~~H

1255 1004
251

COWETA 371240
STATUS:

CHATTAHOOCHEE-FLINT HERITAGE HIGHWAY HISTORIC PRESERVATION BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BOB MOORE LGPA TO BE DONE BY CONTRACT

CONG DIST. ,,3 & 2
ii: FUND souRcE: TRAN it'k~cE.
FEDERAL HIGHWAY AOM!N FUNDS

PE 1995 $

10

ROW 1995 $

4

CONST 1995

$

138

FED SHARE$

1-10

GA. SHARE$

2

0TH SHARE$

30

COUN_TY P.I.NO.

DESCRIPTION PROJECT DATA

COWETA 371300
STATUS:

CR 150/BURTUS HUNTER ROAD@ REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .20 MANAGER: GORDON BROWN(C) SEND LGPA 10/94

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COWETA 371302
STATUS:

CR 82/GOODWYN ROAD@ WHITE OAK REPLACEMENT OF THE EXISTING Q~~u~~~. PROJECT MILEAGE : .22 MANAGER: GORDON BROWN(C) SEND LGPA 10/94

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COWETA, 371304
STATUS:

CR 144/ROCK .liOUSE REPLACEMENT OF THE PROJECT MILEAGE: .20 MANAGER: .GORDON BROWN (C) SEND LGPA 10/94.

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COWETA 371306
STATUS:

CR 21/HAPPY VALLEY ROAD @ BROWNS CREEK 6 MI N OF NEffl.i.i{ijl> :, REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES{:'" PROJECT MILEAGE : .20 MANAGER: GORDON BROWN(C) SEND LGPA 10/94

rr 1BoNG DIST. 3
FUND SOURCE: BRIDGE PROGRAM !J;EDERAL HIGHWAY ADMIN FUNDS

COWETA 371308
STATUS:

CR 239/BOHANNON ROAD@ NEW RIVER 1 MIN OFG~fVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED -LANES. PROJECT MILEAGE : .21 MANAGER: GORDON BROWN(C) SEND LGPA 10/94

22-Feb-1994 Page 16

FISCAL YEAR

COST ESTS

PE

$

8

ROW LOCL

CONST 1997

$

125

FED SHARE $

100

GA. SHARE $

25

0TH SHARE $

PE 1995

$

9

ROW L9CL

CONST 1997

$

400

FED SHARE $

320

GA. SHARE $

80

0TH SHARE $

PE 1995

$.

8

ROW LOCL

CONST 1996

$

150

FED SHARE $

120

GA. SHARE $

30

0TH SHARE $

PE 1995

$

8

ROW LOCL

CONST 1997

$

238

FED SHARE' $' 190

GA. SHARE $

48

0TH SHARE$

PE 1995

$

8

ROW LOCL

CONST 1997

$

300

FED SHARE $

240

GA. SHARE $

60

0TH SHARE $

"

~

~

l!ll!!!ffl'.l!

~ mmm

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CRAWFORD SR 42@ CULPEPPER CREEK W OF SR 7
331600 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : .oo
MANAGER: GORDON BROWN
STATUS: CRAWFORD COUNTY SIGNED 6-.6-92 FOR

CONG DIST, 3
FUND SOURCE: BRIDGE. PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CRAWFORD COUNTY OPERATED PUBLIC TRANSIT 3B1209 TRANSIT FACILITIES/
FUNDS RECIPIENT: CRAWFORD MANAGER: STEVE KISH
STATUS:

CONG DIST, 3 & 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CRAWFORD COUNTY OPERATED 3B1210 TRANSIT FACILITIES
FUNDS RECIPIENT: MANAGER: STEVE KISH STATUS:

CONG DIST. 3 & 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 17

FISCAL YEAR

COST ESTS

PE 1993

UNDERWAY

ROW 1995

$

1

CONST 1996

$

366

FED SHARE $

293

GA. SHARE $

73

0TH SHARE $

OPERATING 1995

$

63

FED SHARE $

35

GA. SHARE $

0TH SHARE $

28

OPERATING 1996

$

65

FED SHARE $

36

GA. SHARE $

0TH SHARE $

29,,.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

STATUS:

I-75 UPGRADE REST AREAS J13 & 14 REST AREA/ RECST. OR REHAB. PROJECT MILEAGE: .00 - EXIST. LANES: MANAGER: J. GARLAND NOT APPLICABLE

CONG DIST. 2
FUND SOURCE:- I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

DOOLY . 311675
STATUS:

I-75, SEWER SYSTEM IN REST REST AREA/ MAINTENANCE PROJECT MILEAGE : 1.00 MANAGER: L. SEABROOK NOT APPLICABLE

CONG DIST. 2 0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

DOOLY 321610
STATUS:

SR 90@ SANDY MOUNT REPLACEMENT OF THE PROJECT MILEAGE : .19 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

DOOLY 321614
STATUS.:

SR 90@ LITTLE REPLACEMENT OF THE EXISTING PROJECT MILEAGE: .19 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88

FUND SOURCE: BRIDGE PROGRAM FEDERAL ,.,,-.--.-...:----:-::::- HIGHWAY ADMIN .FUNDS

DOOLY. 321616
STATUS:

SR 90 .@ TURKEY CREEK TRIBUTARY . REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .15 MANAGER: GORDON BROWN DOOLY COUNTY SIGNED 4-25-88 FOR UTILITIES.

:(iJ[f:=:?tccoNG Dis:Hfii
FUND'.:l\i61;r BRIDGE PRosf@lff//
FEP~dt:i:GHWAY ADMIN ttiNos

DOOLY. 321'618 .
STATUS:

SR. 90@ TURKEY CREEK

.

REPLACEMENT .OF THE EXISTING BRIDGES (S) . NO ADDED LANES.

PROJECT MILEAGE : .42

MANAGER: GORDON BROWN

DOOLY COUNTY SIGNED 4-25-88 FOR UTILITIES.

DOOLY 371210
STATUS:

CR 25 OVER HOGCRAWL CREEK 9 MI WES'l;' OF UNADILLA. REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 1 TO 2 LANES. . PROJECT MILEAGE : . 21
MANAGER: GORDON BROWN(M) DOOLY SIGNED. FORROW, UTILITIES & DETOURS 10-21-93

2
'"iifuri SOUP.-!;,:~:::::li;GE PROGRAM / . FEDERAL..,H!GHWAY ADM IN FUNDS ...::::::/,. -::::::::-=:- :::::::::::::;:::::::::::
CONG DIST. <:2 FUND SOURCE: BRID<if/jkis~RAM FEDERAL HIGHWAY ADMIN

22-Feb-1994 Page 18

FISCAL YEAR.

COST ESTS

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1997

$ 3620

FED SHARE $ 3258.

GA. SHARE $

362

0TH SHARE $

PE NONE

$

0

ROW 1994

$

0

CONST1995

$

75

FED SHARE$

68

GA. SHARE $

8

0TH SHARE$

PE 1990 UNDERWAY

ROW 1995

$

8

CONST 1996

$

570

FED SHARE $

456

GA. SHARE $

114

0TH SHARE $

PE NONE

$

0

ROW 1995 $

8

CONST 1996

$

570

FED SHARE.$. '456

GA. SHARE$

114

0TH SHARE$

PE NONE

$

0

ROW 1995 $

8

CONST 1996

$

150

FED SHARE. $. 120

GA. SHARE $

30

0TH SHARE $

PE NONE

$

0

ROW 1995

$

8

{CONST 1996

$

640

FED SHARE $

512

GA. SHARE $. 128

0TH SHARE $

PE 1994

UNDERWAY

ROW LOCL

CONST 1996

$

290

FED. SHARE $ .. 232

GA. SHARE $

58

0TH SHARE $.

.

ll!lm!l:!l

ffl!!ml

l!ll!!l!ffl

I!!'!!!!!'!'!!!

~

~

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DOOLY 381219
STATUS:

CITY OPERATED PUBLIC.TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF VIENNA MANAGER: STEVE KISH

CONG DIST. 2
FOND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

DOOLY 381220
STATUS:

CITY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: CITY MANAGER: STEVE KISH

CONG DIST. 2
FUND, SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

DOOLY 381423
STATUS:

CITY OPERATED PUBLIC TRANSIT FACILITIES/ FUNDS RECIPIENT: CITY MANAGER: STEVE KISH

CONG DIST. 2
FOND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

DOOLY 381424
STATUS:

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF UNADILLA MANAGER: STEVE KISH

DOOLY 3C2423
STATUS:

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CITY OF UNADILLA
MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 2
FUND SOURCE: RURAL TRANSIT
(fFfE\;D::E:\R:{:A/:::L::: TRANSIT ADMIN FUNDS

22-Feb-1994 Page 19

FISCAL YEAR

COST ESTS

OPERATING 1995 $

13

FED SHARE$

8

GA. SHARE$

0TH SHARE$

5

OPERATING 1996 $

13

FED SHARE$

8

GA. SHARE$

0TH SHARE$

5

OPERATING 1995 $

33

FED SHARE$

20

GA. SHARE$

0TH SHARE$

13..

OPERATING 1996 $

34

FED SHARE$

20

GA. SHARE$

0TH SHARE$

14

1995

$

20

FED SHARE $.

16

GA. SHARE$

2

0TH SHARE$

2

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FAYETTE 321950
STATUS:

SR 92 S/FAYETTEVILLE FM MCBRIDE RD/I~:-. TO J MAYFIELD DR

RECONSTRUCTION & WIDENING FROM2 LANES T0:4 LANES.

PROJECT MILEAGE : 3. 38

:

MANAGER: M. REYNOLDS (M)

COUNTY REFUSED 7/9l;CITY SGN 10/92

ONLY

ATLANTA TIP f FY 3
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 20

FISCAL YEAR

COST ESTS

PE 1993 ROW 1996 CONST

UNDERWAY $ 2313 AFTER 97

FAYETTE 322357
STATUS:

ATLANTA TIP f FY 15 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW NONE
CONST

$

10

$

0

AFTER 97

FAYETTE 322358
STATUS:

SR 7 4 BICYCLE BRIDGE d~K(sR 7 4 IN PEACHTREE BRIDGES / NEW CONSTRUCTIQfi,. PROJECT MILEAGE : .00 MANAGER: GENE POWELL (C) ............ .
PEACHTREE CITY SGN ROW, UTIL)\ ~Q9"J

ATLANTA TIP f FY 14
CONG DIST. 3
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

FAYETTE 322650
STATUS:

SR 74 AT PASCHALL ROAD IN PEACHTREE CITY
~:;~~~c!i~:A~~~o~~E~TE,I~fEiiNEs: 2 /PROPOSEO :mil~ 2
MANAGER: BURT RIDDLE
REQ PEACHTREE CITY DO ROW & UTIL 1-11-94

. {'?\ATLANTA TIP f FY 9 \ONG DIST. 3
')}';UND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS -

:-:-:-:

FAYETTE SR 74 AT CRABAPPLE/PEACHTREE, TYRONE AND JENKIN$ ,:ROADS

ATLANTA T-fi]t FY 19

:xi~/ 322670

0

!;;~~~;;i~:,~:c~L~~T:

~~:~; 2 /PROPOSED LANES(:[:;::::::::::< t 99ff9. DI_~f) $

STATUS: ~~~~~:T:;~I~Ig~i~TIONS

!:~~trn~~~w!~T~M:~1~iii>

FAYETTE 331930
STATUS:

SR 85 CONN FM CR 168 TO SR 85; PPL FM 4.0 TO 6.0RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.
PROJECT MILEAGE : 3.90 MANAGER: K FULBRIGHT (M) REQ BROOKS DO UTILITIES 5-3-93; FAYETTE SGN 6-2-93 UTILITIES

A TIP f Fii :f:;::= DIST. 3 ...,,:;::=:;::=:==:=:==:===

Ftfuo

)Ht souRciiii/i

ACE

FEDERAL ii:i:GiiWAY

PE LOCL

ROW LOCL

CONST 1995

$

754

FED SHARE $

603

GA. SHARE $-

48

0TH SHARE $

103

PE 1994

UNDERWAY

ROW LOCL

CONST 1995

$

130

FED SHARE $

130

GA. SHARE $

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

173

FED SHARE $

173

GA. SHARE $

0TH SHARE $

PE 1993 ROW 1996 ,=,=:=::\/CON ST

UNDERWAY $ 2950 AFTER 97

FAYETTE 342800
STATUS:

SR 85 CONN FM SR 16 .IN SPALDING CTY N TO CR 168 IN BROOKS

RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED.

PROJECT MILEAGE : 3. 34

-

MANAGER: GORDON BROWN(M)

SEND LGPA WHEN PROJECT IS ADDED TO CWP

ffp ATLANTA

t FY 17

CONG DIST."3-

FUND souRcE: suRFA8~:}4~sPORT. FEDERAL HIGHWAY ADMINFUNDS

PE 1996
ROW CONST

$

70

AFTER 97

AFTE~ 97

"

lll!!l!m!il

~

~

~

~

,. . . ., ; i

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FAYETTE 370920
STATUS:

CR 275/SHERWOOD RD@ WHITEWATER CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .20 MANAGER: GORDON BROWN FAYETTE COUNTY SIGNED 9-18-91 FOR

ATLANTA TIP i FY 11
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 21

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 301

FED SHARE$ 241

GA, SHARE$

60

0TH SHARE$

FAYETTE 3V1023
STATUS:

ELDERLY AND DISABLED VEHICLES TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: .AGENCIES MANAGER: STEVE KISH NOT APPLICABLE

CONG DIST. 3

CAPI_TAL 1995

$

10

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

FAYETTE 3V1024
STATUS:

ELDERLY AND DISABLED TRANSIT PROJECTS/ FUNDS RECIPIENT: ~~-M~T~~,c::~~
MANAGER: STEVE KISH NOT APPLICABLE

CONG DIST. 3

CAPITAL 1996

$

10

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

8

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 31171Z
STATUS:

CALL BOXES ON I-85 FM ALABAMA TO SR UNKNOWN/ UNKNOWN PROJECT MILEAGE: ,00 - EXIST. LANES: MANAGER:

CONG DIST. 7 & 3
0 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 22

FISCAL YEAR

COST ESTS

PE

$

0

ROW NONE $

0

CONST 1997

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

'

mm=,

~

~--....>,!

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HARRIS 311710
STATUS:

CALL BOXES ON I-85 FM ALABAMA TO SR 74/P:'.ULTON
~~;~~~~~~~!G~M~R~~~Ni!I~T~~~~S: 0 ';t~QPOSED LANES: 0
MANAGER: BURT RIDDLE NOT APPLICABLE
.:-:

CONG DIST. 7 & 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

HARRIS 31172X
STATUS:

_;:i~ CALL BOXES ON I-1ss FM sR 22/Musc:dii[ijg I-as ..

t;1UscoGEE"

. :m~~: ;= ~~~~ ,!~:~~~~ 00 - EXISTS

0 /PROPOSED ~ k s .-..:- : 0

MANAGER:

CONG DIST. 3 & 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

HARRIS 331590
STATUS:

irnat SR 116 @ SPARKS CREEi

SR SSW

REPLACEMENT OF THE EXISi;ING BRIDGES (S). NO

PROJECT MILEAGE : ,12

MANAGER: GORDON BROWN

HARRIS COUNTY SIGNED 6-4-91

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

HARRIS 342780
STATUS:

SR 1/US 27@ SR 354 IN PINE MOUNTAIN

INTERSECTION IMPROVEMENT/ SAFETY

PROJECT MILEAGE : .98 - EXIST. LANES: 0 /PROPOSE!;)

MANAGER: GORDON BROWN COUNTY SGN 2-12-92 FOR ROW & UTILITIES

(T&',$. 1n~:61\f{

,={CONG DIST. 3 ')GRIP PROJECT ._._. FUND SOURCE: HWY. SAFETY
F:E->:DE. RAL HIGHWAY ADMIN FUNDS

HARRIS 371220
STATUS:

CR 268/KING GAP ROAD @ CRAWFORD CREEK NEAR MERl)ifETHER CO LN REPLACEMENT OF THE EXISTING BRIDGES (S) . NO ADDED LANES ..<::\: PROJECT MILEAGE : .20 MANAGER: GORDON BROWN(M) HARRIS CO SGN ROW, UTILITIES & DETOURS 9-7-93

22-Feb-1994 Page 23

FISCAL YEAR

COST ESTS

PE

$

20

ROW NONE

$

0

CONST 1997

$

700

FED SHARE $

630

GA. SHARE $

70

0TH SHARE $

PE

$

0

ROW NONE

$

0

CONST 1997

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1992

UNDERWAY

ROW 1994 UNDERWAY

CONST 1995

$

273

FED SHARE $

218

GA. SHARE $

55

0TH SHARE $

PE 1994

UNDERWAY

ROW LOCL

CONST 1995

$

587

FED SHARE $ :528

GA. SHARE $

59

0TH SHARE $

._,."'~: ,:,.:~~

PE 1994

UNDERWAY

ROW LOCL

CONST 1997

$

337

FED SHARE $

270

GA. SHARE $

67

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 24

PROJECT LISTING -BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

------------------------------------------------------------------------------

-C-O-M-M-E-N-T-S---------------------------Y-E-A-R--------E-S-T-S---.

HENRY I-75 FM I-675 TO SR 7/US

LIGHTING)

ATLANTA TIP lt CL-R 12

PE 1996

$

79

310976 WALLS/ RECST. OR REHAB.

CONG DIST. 3

ROW NONE

$

0

PROJECT MILEAGE : 7.80

CONST

AFTER 97

MANAGER: J. GRAYBEAL

FUND SOURCE: NAT'L HIGHWAY

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

31097X IS AN ASSOCIATED PROJECT.

HENRY 311120
STATUS.:

SR 20/SR 81 OVER I-75 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .30 MANAGER: J. GRAYBEAL COUNTY SIGNED 11-14-85

UTILITIES.

ATLANTA TIP lt HE 1 CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1987

UNDERWAY

ROW 1995

$

700

CONST 1997

$ 1863

FED SHARE $ 1677

GA. SHARE $

186

0TH SHARE $

HENRY 311760
STATUS:

HUDSON BR RD/EAGLES BRIDGES/ RECST. OR PROJECT MILEAGE : ,00 MANAGER: GENE POWELL (M) ATL TECH CTR SGN 1/3 CST

CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995

$

ROW NONE

$-

CONST 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE.$

10.
0 256 230
38 64

HENRY 321145
STATUS:

N-S 1-WAY PAIR/MCDONOUGH FM N/RA CONSTRUCTION OF NEW ROUTE WITH 2 PROJECT MILEAGE : 1.20 MANAGER: GENE POWELL (M) REQUESTED CITY OF MCDONOUGH TO

SOURCE: SURFACE TRANSPORT. HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

650

AFTER 97

HENRY 322680
STATUS:

i : T ~ ~ , ~ ~ T ~ ; NA i ~ ! ; ~ ~ : T D ? ~ ! ~ yMCDONOUGH

jj/@]f)!!~~~s~:~~~ilt HE 1

PROJECT MILEAGE : , 2 5 - EXIST. LANES : 2 /PROPOSED LANES f/3)')

MANAGER: BURT RIDDLE

FUNo'.tsBTMHE: HWY .,,sAFETt:tr:rr

HENRY SIGNED FOR ROW & UTILITIES 5-3-93

FEDEf,f-~i:-i itIGHwAY iIBMIN/@!tmoif

PE NONE

$

0

.ROW LOCL

CONST 1996

$

111

FED SHARE $

100

GA. SHARE $

11

0TH' SHARE $

HENRY 331360
STATUS:

SR 650/ HAMPTON RD FM I-75 EAST TO SR 42 IN LOCUST GROVE RECONSTRUCTION & WIDENING FROM 2 LANES T04 LANES. PROJECT MILEAGE : .70 MANAGER: M GANNAWAY (M) SIGNED COUNTY 8-6-85 FOR R/W & UTILITIES

PE ROW LOCL
rs ~:~~J!ilii~R~~~NTRANsPokMBt= tONST

$

32

AFTER 97

HENRY SR-155 NB 11.8-0.25 HENRY;SB 1.6-3.1/SEE SPALDING 33152X ADDITION OFA PASSING LANE.
PROJECT MILEAGE : 00 MANAGER: GORDON BROWN
STATUS: HENRY COUNTY SIGNED 5/15/89 FOR UTILITIES.

CONG DIST.::::3
FUND SOURCE: suRFi@;f{Jb.NsPoRT.
FEDERAL HIGHWAY MM!N FUNDS
331520 IS AN Ass6t!i,'I:'ED PROJECT.

PE 1992 ROW 1996 CONST

UNDERWAY

$

0

AFTER 97

.

,,

=

""""'

~

COUNTY
P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HENRY
331550
STATUS:
HENRY 331980
STATUS:

SR 20 EB FM MP 14.41 TO 13.21; WE MP 13:;2!1 TO 11. 74

ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 2.67
MANAGER: GORDON BROWN(M)
HENRY COUNTY REFUSED 7-2-92

.:'::'
(BY LETTER.C, ._.-'l;O:;: ~i,S,_~{UCT)

.;'/)d2:::.,-

Ei-i6}i'-~i; JONESBORO RD/CR 655 FM I-75 TO

PAIR rn"fadooNOUGH

RECONSTRUCTION & WIDENING FROM_ 2 '~~~S TO 4 LANES.''.'

./c'.'Cif'' PROJECT MILEAGE : 3, 20
MANAGER: GENE POWELL (M)

:,,(\:.

SEND LGPA WHEN PROJECT IS;":ADO.,E.D_'."ro CWP

ATLANTA TIP f HE 11
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t HE 7
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1'!194 Page 25

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1996

$

380

CONST 1997

$ 1131

FED SHARE $

905

GA. SHARE $

226

0TH SHARE $

PE 1995 ROW LOCL CONST

$

20

AFTER 97

HENRY
331990
STATUS:

iif:e;:mca JONESBORO ROAD/CR 65~"'

CREEK

-:"'-' ,','1,:',.

RBPLACt.MENT OF THE EXISTp4G BRIDGES (S) _ FROM 2 T: :;f .';ANES.

PROJECT MILEAGE : 00

\):~.

MANAGER: GENE POWELL (M) SEND LGPA IN 1996

'"";t{; ..f' ,, ---

.r.;-;_f:::i i,.

;;,s_ Ii>

ATLANTA TIP t HE 7
CONG DIST. 3
FUND SOURCE! BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE
ROW LOCL CONST

$

25

AFTER 97

HENRY 370940
STATUS:

CR 290/S HAMPTON RD OVER TOl'i'ALIGA RIVER SE HAMPTON (/'-;:,,;:,":(.\:/(;ATLANTA TIP t HE 15

REPLACEMENT OF THE EXISTING BRIDGES (S) NO APDED LANES"..',,,,

~~i~:M~~~: ~R()~(M)

-<-if\.:'.

REQ HENRY COUNTY DO ROW, UTILITIES & DETOURS. 3\:f:;f'i-:92

.,~;:-i:"cCoNG DIST. 3
:,,;,c;UND SOORCE: BRIDGE PROGRAM FEDl!lruU, HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW LOCL

CONST 1997

$

353

FBD SIIARE $

282

GA. SHARE $

71

0TH SHARE $

HENRY 370941
STATUS:
HENRY 3B1229
S'!'ATUS:
HENRY 3B1230
STATUS:

NALNUT TR:;tt:y CR '32/,URNER CSURCH RO OUER

CREEK

::::T: ;;;,. t HE 16

:it ~~~~~f~~.!~'~:I;:~,= REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : 50

BRIDGES (SJ

NO

ADDED

LANES.

<"-:'( _.,,;.~

}}}:; 'Y,_CQ-.. N,_,G~

OIS'.tj; ;3.

UTILIT>ES :;::;E~~U~~~~G:~gw;OR

6-1-92

~ ,,. , .,. ,,,...,.~;._.;

, -.:,;_}c\, ...

PE 1993

UNDERWAY

ROl'i' LOCL

CONST 1995

$

259

FED SHARE $

207

' GA. SHARE
0TH SHARE $

52

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HENRY

.-:'.,,d)'

.(d/ .'.~ ,-

sJc'QNG DIST. 3 '&':U.:-

' .'-'f:."f-,.,

. ;;:_'.':' ;,..,

QP!:MTING 1995

$

61

MANAGE,R: S'lEVE l<ISH

'>,<,,> FUND SOOR_c;t:i:-:J!,URAL TRANSIT
FEDE~":J~$':i:T ADMIN FUNDS,.

FED SHARE $

36

GA. SHARE$

0TH SHARE$

25

.,-,,\

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: HENRY MANAGER: STEVE l<ISH

CONG DIST. '3 & 11 ;;' ..,,:-

FUND SOURCE: RURAid;hlrii~IT

OPERATING 1996

$

FED SHARE$

"37

FEDERAL

TRANSIT

A
'

t,_i,k,,.I,:N-

FUNDS

GA. SHARE$

0TH SHARE.$

26

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

HENRY 3C2229
STATUS:

ONE STANDARD VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HENRY MANAGER: STEVE KISH LGPA NOT APPLICABLE

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT, STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 3 & 11
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 26.

FISCAL YEAR

COST ESTS

CAPITAL 1995

$ . 20

FED SHARE $ 16

GA. SHARE$

2

0TH SHARE$

2

HENRY 3C2230
STATUS:

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: HENRY MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 3 & 11

CAPITAL 1996

.$

52

FUND SOURCE: RURAL TRANSIT

FED SHARE$

42

FEDERAL TRANSIT ADMIN FUNDs

GA. SHARE$

5

0TH SHARE$

5

.HENRY 3V1032
STATUS:

ELDERLY AND DISABLED
TRANSIT PROJECTS/ FUNDS RECIPIENT: AGENCIES\,
MANAGER: STEVE KISH NOT APPLICABLE

CONG DIST. 6 & 4

CAPITAL 1995

$

11

FUND SOURCE: ELDERLY & DISABLED FUND FED -SHARE $

9

FEDERAL TRANSIT ADMIN FUNDS.

GA. SHARE $

1

0TH SHARE $

1

HENRY 3Vl033
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN HENRY COUNTY MANAGER: STEVE KISH NOT APPLICABLE

DIST. 6 & 4

CAPITAL 1996

$

12

SOURCE: ELDERLY & DISABLED FUND FED SHARE $

10

TRANSIT ADMIN FUNDS

GA. SHARE $

1

0TH SHARE $

1

,,

mmm,

l!!!!!llll !l!!!l!l!!!ll

l!!l!!!!!!I

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTIN~ BY COUNTY FY 1995/FY 1997
COMMENTS

HOUSTON 321590
STATUS:

SR 2 6 OVER ELKO CREEK

.....

REPLACEMENT OF THE EXISTING BRIDGES (S). 'ftq ADDED LANES.

PROJECT MILEAGE : . 19

.....

tJ:tt, ~!~~R~-1~~~~Nu~~~~xcEPT PVT UTLS-DEiiAii

csT PLANS)

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

HOUSTON 322460
STATUS:

SR 96 FM US 129@ BONAIRE

RECONSTRUCTION & WIDENING

PROJECT MILEAGE : 9.32

;~v:ibBihf~ =tG~~~AJwHi~~:~J~>

CWP

( INCL'!: lt:t{IDGES) 4 LANES.

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 27

FISCAL YEAR

COST. ESTS

PE 1990 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995

$

770

FED SHARE $

616

GA. SHARE $

154

0TH SHARE $

PE 1994 ROW 1996 CONST

UNDERWAY

$

729

AFTER 97

HOUSTON 322560
STATUS:

I-75 AT NEW WEST PERRY(BYJ?.ASS SOUTH OF PERRY

~~~s~R~ii~~~ ::;~g~~~~E{G~E~

LANES: o /PROPosi6!:!!l!k~: 4

MANAGER: J. GARLAND

::,(

.

HOUSTON COUNTY SIGNED 9-1-92

HOUSTON 332120
STATUS:

SR 26 OVER GA SOUTHERN AND FLA RAILROAD REPLACEMENT OF THE EXISTING BRIDGES{S). PROJECT MILEAGE : .42 MANAGER: GORDON BROWN SEE PI #321590

HOUSTON 332130
STATUS:

SR 26 OVER BURNHAM BRANCH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES._.,: PROJECT MILEAGE : .19 MANAGER: GORDON BROWN SEE PI #321590

HOUSTON 332140
STATUS:

SR 26 BRIDGE OVER CATNA BRANCH REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .20 MANAGER: GORDON BROWN
SEE PI f321590

HOUSTON 332190
STATUS:

SR 247 DRAINAGE IMPROVEMENTS NEAR GREEN ST IN WARNER ROBINS MISCELLANEOUS IMPROVEMENTS/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 4 /PROPOSED LANES: 4 MANAGER: UNKNOWN REQ HOUSTON PUB UTL 12/93;WARNER ROBINS SGN PUB UTL 12/93

CONG DIST. 2 & 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1996

$

250

CONST 1996 $ 4800

FED SHARE $ 3840

GA. SHARE $

960.

0TH SHARE $

DIST. 2
FUND SOURCE: BRIDGE PROGRAM JfEQ;J;;RA.t,_ HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW 1993 UNDERWAY

CONST 1995

$

852

FED SHARE $

682

. GA. SHARE $

170

0TH SHARE $

PE NONE $

0

ROW 1993 UNDERWAY

CONST 1995

$

512

FED SHARE $

410

GA. SH~ $

102

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

:-:-:::,:toNST 1995

$

301

FED SHARE $

241

GA. SHARE $

60

0TH SHARE $

CONG DIST .-:',,g & 2 FUND souRcE: suRFK8iiffusPORT.
FEDERAL HIGHWAY J\DMIN FUNDS

PE 1994

$

15

ROW NONE

$

0

CONST 1995

$

440

FED SHARE $

352

GA. SHARE $

88

0TH SHARE $

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF.TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HOUSTON 342340
STATUS:

sR 247C FM HOUSTON LAKE RD TO SR 247/INGL INTER. IMPROVEMENT
::;~~~c!i~:A!~~o~~~TE,I~~E~ES: 5 :';t~QPOSED LANES: 5 MANAGER: GORDON BROWN SGN ROW & UTILITIES 5/18/88

W. ROBINS TIP ft 1985-6 CONG DIST. 8 & 2
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY .ADMIN FUNDS

HOUSTON 342930
STATUS:

CARL:A}~;:;~l ! ELBERTA RD FM HOUSTON RD TO

1
: : -=~~R ROBINS

RECONSTRUCTION & WIDENING FROM:2=iillES TO 4 LANES.

PROJECT MILEAGE : 1.20

MANAGER:

CONG DIST. 2 & 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 28

FISCAL ~ YEAR

COST ESTS

PE 1992

UNDERWAY

ROW LOCL

CONST 1996

$

650

FED SHARE $

585

GA. SHARE $

65

0TH SHARE $

PE ROW CONST

$

30

AFTER 97

AFTER 97

HOUSTON 350,830,
STATUS:

s. DAVIS DR FM RANDOLPif(iVE TON/DEMON

RECONSTRUCTION & WIDENit:fr/JfROM 4 LANES

PROJECT MILEAGE: .47

MANAGER: GORDON BROWN

:: /\,::

WARNER ROBINS SGN 12-5-91 FO!(

W. ROBINS TIP ft 1986-5 CONG DIST. 8 & 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

HOUSTON 350900
STATUS:

/~~;~~ Ri~~ ;~~NL~E;M

o!L

SIDE & N' SIDE FM GREEN<:1g:/l!lvt~ <i::1=::::::::li~oN!o~i:~. T!P t 1986-4

PROJECT MILEAGE: .30 - EXIST. LANES: 4 /PROPOSEp:fJWfs: 5 MANAGER: GORDON BROWN WARNER ROBINS SGN 1-28-93 IF AGREE ON CONC~I>T[\

FUND SOURCE: HWY. SAFETY. FEDE-:-:R-;-.-A-..L. HIGHWAY ADMIN. FUNDS

HOUSTON 350930
STATUS:

SR 127 FM CR 272/KING'S CHAPEL RD TO PERRY CIT;(:t.IMITS

RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PRO.IBCT MILEAGE : .69

MANAGER: RAY METTS

;;;::::

PERRY REFUSED 11-11-92/COUNTY REFUSED 11-17-92/REQ cos~

CONG DIS'iiffa & 8
F~;:::::~aiicii:: SURFACE TRl&'#bl: "\i[i:GHWAY. AbMIN)ttilios

PE 1992

UNDERWAY

ROW LOCL

CONST 1995

$

531

FED SHARE $

425

GA. SHARE $

106

0TH SHARE $

PE NONE

$

0

ROW LOCL

CONST 1995

$

652

FED SHARE $

587

GA .. SHARE $

65

0TH SHARE $

PE 1993 ROW 1996 CONST

UNDERWAY

$

717

AFTER 97

HOUSTON HISTORIC DEPOT RESTORATION & LINEAR PARK IN WARNER ROBINS 371020 : MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: CORA COOK STATUS: TO BE DONE BY CONTRACT
HOUSTON ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 3Vl014 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN W. ROBINS MPO AREA _MANAGER: STEVE KISH STATUS:

):#{ROBINS TIP 11/[4
:):ONG DIST. 8. &:2:t
i&No souRciHI \i!ifurn . ENHANCE.
FED~ . .1tfoiiWAY ADM IN
w. ROB;!~ITIP t 1-16
CONG DIST. ,g & 2 FUND SOURCE: ~u1v1~,'.t..tt._:. FEDERAL TRANSIT

1995

$

8

LOCL

1995

$

242

FED SHARE $

194

GA. SHARE $

2

0TH SHARE $

50

CAPITAL 1995

$

15

FUND FED SHARE$

12

GA. SHARE"$

2

0TH SHARE$

2

:0

~

~

~

~

~

~

~

ll\'f,.~111'",.l

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 29

FISCAL .YEAR

COST ESTS

HOUSTON 3Vl015
STATUS.:

ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN W. ROBINS MANAGER: STEVE KISH

W. ROBINS TIP# 1-16(1)

CONG DIST. 8 & 2

CAPITAL 1996

$

16

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

JC>NES 331850
STATUS:

SR 18 EB MP14.85-16.l;EB MP ADDITION OF A PASSING LANE. PROJECT MILEAGE: 4.51 MANAGER: GORDON BROWN{M} REQ GRAY DO PUB UTIL 12-2-9l;JONES

17.14-18.7

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 30

FISCAL YEAR

COST ESTS

PE 1993

UNDERWAY

ROW 1996

$

24

CONST 1997

$ 1233

FED SHARE $

986

GA. SHARE $

247

0TH SHARE $



~

~

~

ll'!!!l.'!Z!ll

~- ~

l'f---~.>,

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

LAMAR 321370
STATUS:

SR18 SB 14.7-15.2;MONROE:EB ADDITION OF A PASSING LANE. PROJECT MILEAGE : 4.20 MANAGER: GORDON BROWN(M) UPDATED LGPA SHOULD BE SENT

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 31

FISCAL YEAR

COST ESTS

PE 1992 ROW 1996 CONST

UNDERWAY

$

280

AFTER 97

LAMAR
331820
STATUS:

SR 36: NB MP-10.15-11.75; SB ADDITION OF A PASSING LANE. PROJECT MILEAGE: 4.75 MANAGER: GORDON BROWN(M) REQ LAMAR COUNTY DO

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

44

AFTER 97

LAMAR
3B1516
STATUS:

COUNTY OPERATED TRANSIT PRO.Jr:CTS FUNDS RECIPIENT: LAMAR rrinM~V MANAGER: STEVE KISH
NOT APPLICABLE

LAMAR 3B1517
STATUS:

COUNTY OPERATED PUBLIC TRANSIT TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: LAMAR COUNTY MANAGER: STEVE KISH NOT APPLICABLE

CONG DIST. 3

OPERATING 1995 $

42

FUND SOURCE: RURAL TRANSIT

FED SHARE$

25

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

17

DIST. 3

OPERATING 1996 $

45

SOURCE: RURAL TRANSIT

FED SHARE$

27

.~~~it,i,,. TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

18

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MACON 32198X
STATUS:

SR 26 PASSING LANES@ 4 LOC/SCHLEY & MAqpN co SEE SCHLEY ADDITION OF A PASSING LANE. PROJECT MILEAGE: .00 MANAGER: GORDON BROWN

CONG DIST. 2 GRIP PROJECT FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 321987 IS AN ASSOCIATED PROJECT.

MACON 322280

SR 90@ SCL RR/SAND CRK IN IDEAI,.fii:i2)RR S/JCT.\$~ 195 RPREPOLJAECCETMEMNILTEAOGFETH: E . E00XISTING B.R...J..i.:..f.i..;.;.t..s.{. s) . NO ADDED LANE.S.

STATUS: =~~E~~NG~~~~9~Rg~LIT1:ti)iBti:sGN 5-13-91 FOR u~~;fTIEs

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MACON 322290
STATUS:

SR 49/128 @ MILLS c~fjjif ~F JCT W/SR 49 & 26 REPLACEMENT OF THE EXISTh~~ BRIDGES (S) . NO ADDEI) ijffi\@:
PROJECT MILEAGE : .70 MANAGER: GORDON BROWN
MACON COUNTY SIGNED FOR

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MACON 370950
STATUS:

ANDERSONVILLE NATL PRISONER OF CONSTRUCTION OF NEW ROUTE WITH PROJECT MILEAGE : 1.10 MANAGER: J. TOLSON REQ SUMTER DO UTIL 9-23-93; MACON SGN

DIST. 2
SOURCE: TRANS. ENHANCE. HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 32

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1994 UNDERWAY

CONST 1995

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1992 UNDERWAY

ROW 1995

$

195

CONST 1996

$ 2422

FED SHARE $ 1938

GA. SHARE $

484

0TH SHARE $

PE 1992 UNDERWAY

ROW l,995

$

15

CONST 1995

$

251

FED SHARE $

201

GA. SHARE $

50

0TH SHARE $

PE LOCL
ROW NONE $ CONST 1995 $
FE~ SHARE $ GA. SHARE $ 0TH SHARE $

0 2390 1912
478

-.mm

~

l'!!!m:!:!:I

~

~

~

~

~

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MARION 321982
STATUS:

SR 26 WB MP 14.2-12.7;EB ll.2-12.6;WB ADDITION OF A PASSING LANE. PROJECT MILEAGE : .60 MANAGER: GORDON BROWN MARION COUNTY SIGNED 8/6/90

CONG DIST. 2 GRIP PROJECT FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

MARION 331610
STATUS:

SR 355@ PINE KNOT CREEK N OF REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .90 MANAGER: GORDON BROWN MARION COUNTY SGN FOR

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MARION 342895
STATUS:

CR 128/DOYLE ROAD@ REPLACEMENT OF THE PROJECT MILEAGE : .21 MANAGER: GORDON BROWN MARION COUNTY SIGNED ROW,

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 33

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1993 UNDERWAY

CONST 1995 $ 1933

FED SHARE $ 1546

GA. SHARE $

387

0TH SHARE $

PE 1993 UNDERWAY

ROW 1995

$

28

CONST 1996

$

811

FED SHARE $

649

. GA. SHARE $

162

0TH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1997

$

363

FED SHARE $

290

GA. SHARE $

73

0TH SHARE $

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MERIWETH REPLACE SCL RR BR OVER SR 41 W OF WARM '::f!'RINGS/INCL DETOUR

321880 BRIDGES/ RECST, OR REHAB.

PROJECT MILEAGE : .25

MANAGER: J. GRAYBEAL (M)

STATUS: MERIWETHER COUNTY SIGNED 12/14/88

ONLY.

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

lks. MERIWETH SR 100 @ OLLIE BRANCH S OF SR 54:),)::)}:\/
331630 REPLACEMENT OF THE EXISTING BRIP.'.c'Jffi}f{s) . NO ADDED

PROJECT MILEAGE : 38

---------------

MANAGER: GORDON BROWN STATUS: MERIWETHER SIGNED 3-9-92 t8W:WflrTIES.

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MERIWETH CHATTAHOOCHEE-FLINT iikliH.l!:i~E HIGHWAY HISTORIC; 37124X UNKNOWN/ UNKNOWN
MPRAONJAEGCETR: MILEAGE : . 00 - E:l.t::::::t..s.T. LANES: 0 /PROPO$ltP::::.:-}:- iJW. Jfa: 0
STATUS:

CONG DIST. 3 & 2
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

MERIWETH RED OAK CREEK COVERED BR/HUGH 371310 BRIDGES/ ENHANCEMENT
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS: DOT WILL PROVIDE THE 20% MATCH

DIST. 2
SOURCE: TRANS. ENHANCE. ADMIN FUNDS

22-Feb-1994 Page 34

FISCAL YEAR

COST ESTS

PE 1992 ROW 1997 CONST

UNDERWAY

$

421

AFTER 97

PE 1993 UNDERWAY

ROW 1995

$

10

CONST 1996

$

335

FED SHARE $

268

GA. SHARE $

67

0TH SHARE $

PE 1995 $

0

ROW 1995

$

0

CONST 1995

$

0

FED SHARE$

GA. SHARE$

0TH SHARE $ - -

PE NONE $

0

ROW NONE $

0

CONST 1995 $

82

FED SHARE$

66

GA. SHARE$

16

OTH-SHARE $

llmlm:t

~

~

~

~

~

~

~

.... ~

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MONROE 31159X
STATUS:

I-465 FM I-75 TO SR 19/US 41/BIBB UNKNOWN/ UNKNOWN PROJECT.MILEAGE : .00 - EXIST. LANES: MANAGER:

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

MONROE 311615
STATUS:

I-75 UPGRADE REST AREA t 22
REST AREA/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: J. GARLAND NOT APPLICABLE

CONG DIST. 3
0
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

MONROE 311640
STATUS:

I-475 RAMPS AT SR 1 RAMP/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: K FULBRIGHT (M) REQ MONROE COUNTY DO

CONG DIST. 3
4 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 35

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW NONE

$

. 0

CONST 1995 $

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1994 UNDERWAY

ROW NONE

$

0

CONST 1996 $ 1820

FED SHARE $ 1638

GA. SHARE $ 182

0TH SHARE $

PE 1994 ROW 1996 CONST

UNDERWAY

$

10

AFTER 97

MONROE 311740
STATUS:

SR 408/I-475 NBL@ I-75; ADD
BRIDGES/ RECST. OR REHAB.~ PROJECT MILEAGE : .25 MANAGER: K FULBRIGHT (M) REQ MONROE DO UTilities 10-7-93

DIST. 3

D SOURCE: I-STATE MAINT.

. DE

GHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1995 $

20

CONST 1996

$

430

FED SHARE $

387

GA. SHARE $

43

0TH SHARE $

MONROE 32137X
STATUS:

SR 18 BTWN BARNESVILLE & FORSYTH/PASSING ADDITION OF A PASSING LANE. PROJECT MILEAGE : .00 MANAGER: UNKNOWN

FUND:4\9~bf: SUF.f/l,C::E T~~j~iH<
FED11:AAL}1tIGHWAY AbMIN{~UNDS
3213if6?is AN ASSOCIAfEOiJtWJECT .t=

PE 1992 ROW 1996 CONST
.

UNDERWAY

$

0

AFTER 97

MONROE 33218X

SR 7/US 341 FROM-.25 MIN. ACADEMY DR TO .SR 74 ... LAMAR

RIDING SURFACE REHABILITATION. SURFACE, GRIND, SEAL, STRIPE Efdlbb~G DIST. 3:

PROJECT MILEAGE : 12.57 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK

f=;tb souRct:Ili~&tAcE TRANSPcikiW

R~: ~~~! :
~ 9
toNs~E~ ~~ARE

0 0 0

STATUS:

FEDE.~ fi}l#AY ADMIN

GA. SHARE $

0TH SHARE$

MONROE 370810
STATUS:

CR 193@ RUM CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .30 MANAGER: GORDON BROWN MONROE COUNTY SIGNED 9-17-91 FOR ROW, UTILITIES & DETOURS.

CONG DIST :-"\3 FUND SOURCE: BRID6t/ti6~RAM
FEDERAL HIGHWAY JM)~iN FUNDS

PE 1991. UNDERWAY

ROW LOCL

CONST 1995

$

404

FED SHARE$

323

GA. SHARE$

81

0TH SHARE$

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MONROE 370811
STATUS:

CR 163/WESTBROOKS RD OVER TOWALIGA REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .50 MANAGER: GORDON BROWN MONROE SGN DO ROW, UTIL

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MONROE 370812.
STATUS:

CR 152/ENGLISH ROAD OVER REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .50
MANAGER: GORDON BROWN MONROE COUNTY SGN

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS.

22-Feb-1994 Page 36

FISCAL YEAR

COST ESTS

PE ~993 UND~RWAY

ROW LOCL

CONST 1995 $ 374

FED SHARE$ 299

GA. SHARE$

75

0TH SHARE$

PE 1993. UNDERWAY

ROW LOCL

CONST 1995 $ 200

FED SHARE$ 160

GA. SHARE$

40

0TH SHARE$

- . :.. ,



~

~

~

~

h~.a...ts;.Y

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

MUSCOGEE I-185 BR WON & CORRECT "S" 311155 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: GENE POWELL (M) STATUS: LGPA NOT APPLICABLE

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
COLUMBUS TIP f 91-ST-2001
CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 37

FISCAL YEAR

COST ESTS

PE 1993 ROW 1997 CONST

UNDERWAY

$

200

AFTER 97

MUSCOGEE I-185/COLUMBUS FM ST MARY'S 311440 RECONSTRUCTION & WIDENING
PROJECT MILEAGE : 1.17 MANAGER: GENE POWELL STATUS: COLUMBUS/MUSCOGEE

COLUMBUS TIP f 91-ST-2001
CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 31Y440 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1995 $ 1898

FED SHARE $ 1518

.GA. SHARE $

380

0TH SHARE $

MUSCOGEE I-185/COLUMBUS 311445 RECONSTRUCTION &
PROJECT MILEAGE : 2.83 MANAGER: GENE POWELL (M) STATUS: SEND LGPA IN 1995

COLUMBUS TIP f 91-ST-2001
CONG DIST. 2
FOND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW NONE $

0

CONST 1997 $ 7656

FED SHARE $ 6125

GA. SHARE $ 1531

0TH SHARE $

MUSCOGEE I-185 FM BUENA VISTA RD/COLUMBUS 311450 RECONSTRUCTION & WIDENING FROM 2
PROJECT MILEAGE: 1.33 MANAGER: GENE POWELL STATUS: COLUMBUS/MUSCOGEE SIGNED FOR UTILITIES

f 91-ST-2001
& 3
-:::::/'~ONO SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
'3'11450':ti,;. AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1995 $ 2692

FED SHARE $ 2154

GA. SHARE $

538

0TH SHARE $

MUSCOGEE SR 22 AND 411 (I-185) .. ;SLOPE IMPROVEMENTS

311570 MISCELLANEOUS IMPROVEMENTS/ OTHER



i]J)' PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES.{))

~J~tvr MANAGER: J. GRAYBEAL

=::9-QNG 0Ii;f/j
FUNo.AiBffiWt = I-s';'.~'.,rE

STATUS: NOT APPLICABLE

FEDJ1iiijfr))fIGHWAY ADMIN-{FUNDS

PE 1994 UNDERWAY

ROW 1994

UNDERWAY

CONST 1995

$ 1300

FED SHARE $ 1170

GA. SHARE $

130

0TH SHARE $

MUSCOGEE I-185 INTERCHANGE AT SR 1 311630 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : . 00 EXIST. LANES:, 2 /PROPOSED LANES: 4
MANAGER: M. REYNOLDS STATUS: SEND LGPAIN 1995

.FtJND SOURCE@ :#'STATE MAINT.
FEI:iE~ ,,,1tl9ijijJi.y ADMIN

PE 1994 ROW 1996 \CONST

UNDERWAY $ 1500 AFTER 97

MUSCOGEE CALL BOXES ON I-185 FM SR 22/MUSCOGEE TO I-BS/TROUP 311720 MISCE~LANEOUS IMPROVEMENTS/ SAFETY
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT.RIDDLE
STATUS: NOT APPLICABLE

FUND SOURCE: I-STAH:iia:INT.
FEDERAL HIGHWAY 1$:Ml)f FUNDS

PE

$

14

ROW NONE

$

0

CONST 1997

$

450

FED SHARE$

405

GA. SHARE$

45

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 38

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-NO-.----------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M--EN-T-S---------------------------Y-E-A-R---------E-S-T-S--

MUSCOGEE I-185.0VER OLD CUSSETA ROAD/CR 62

PE NONE

$

0

311770 BRIDGES / RE CST . OR REHAB.

CONG DIST. 2

ROW NONE

$

0

PROJECT MILEAGE: .00

CONST 1997

$

234

MANAGER: GENE POWELL (M)

FUND SOURCE: I-STATE MAINT.

FED SHARE $

211

STATUS: SEND IN 1995

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

23

0TH SHARE $

MUSCOGEE I-185/COLUMBUS FM ST MARY'S 31Y440 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS:

PE NONE

$

0

CONG DIST. 2

ROW NONE

$

0

CONST 1995

$

200

FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $

180

GA. SHARE $

20

311440 IS AN ASSOCIATED PROJECT.

0TH SHARE $

MUSCOGEE I-185 FM BUENA VISTA 31Y450 UNKNOWN/ UNKNOWN
PROJECT MILEAGE : MANAGER: UNKNOWN STATUS:
MUSCOGEE SECOND AVE/COLUMBUS@ C OF 321670 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: BILL MOSKAL STATUS: COUNTY SIGNED 5-28-91 FOR ROW AND
MUSCOGEE SR 1/US 27/4TH AVE/COLUMBUS OVER C OF GA RR 321810 BRIDGES/ RECST. OR REHAB.
PROJECT MILE~GE : .25 MANAGER: D. CHURCH (M) STATUS: MUSC~GEE COUNTY SIGNED 6/13/90 FOR UTILITIES.
MUSCOGEE SR1/US27/4TWAVE IN COL. OVER CG RR- EARLY R/W $ 32Y810 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE : .00 MANAGER: D. CHURGH STATUS:

CONG DIST. 2 & 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 311450 IS AN_ ASSOCIATED PROJECT.

PE NONE

$

0

ROW NONE $

0

CONST 1995

$

300

FED SHARE $ 270

GA. SHARE $

30

r OTH_ SHARE $

ft 86-UD-3001
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE '1993

UNDERWAY

ROW LOCL

CONST 1995

$ 4702

FED SHARE $ 3762

GA. sHARE $

940

0TH SHARE $

. COL~::\,t f 86-UD-3001

:) ~i~i ~~g,8~

.,.,.,., ,

PE 1992
ROW 1996 CONST _1997

UNDERWAY'
$ 2262 $_ 4958

FUND SOURCE: .NAT'L HIGHfii& f<

FED SHARE $ . 3966

FEDifud.:iii:i:GHWAY MMIN FUN6if
~?t6Jo.: is AN ASSOCIATEb/PkOJECT. :}/

GA. SHARE $

992

0TH SHARE $

' ::: ::gg~~us TIP f..JJ4B6E308L...

PE NONE

$

0

'"~iiJ~IZ!~:~~i~:~;~~t,if i ':}foNG DIST. 2

ROW 1996

$

786

;coN];!'iEE 0

MUSCOGEE SR.85/US 27A AT MILLER RD, FLAT ROCK RD & COUNTY LINE ROAD 332160 ACCELERATION/DECELERATION LN / SAFETY
PROJECT MILEAGE : 5.53 - EXIST. LANES: 4 /PROPOSED LANES: 0 MANAGER:.GORDON BROWN(M)
STATUS: SEND LGPA IN 199

COLUMBus"'iIP f 33216o(i

CONG DIST .3

.

FUND SOURCE: NAT 1 tiil1~f~AY
FEDERAL HIGHWAY JWijilf FUNDS

PE 1995 ROW 1997 CONST

$ .

46

$

150

AFTER 97

,.

l!l!l!'l!!!ll'! ~ ~

~; . - .;.;, ~

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MUSCOGEE SR 22 SPUR@ AVALON RD/COLUMBUS .. LEFT TURN LANES & SIGNAL

342490 TURN LANES / SAFETY

\\,.

PROJECT MILEAGE : .00 - EXIST. LANES: 0 lfRC>POSED LANES: 0

MANAGER: GORDON BROWN

... .

STATUS: SGN 3/29/89 FOR ROW, UTIL & 25%

COLUMBUS TIP f 93-SR-2001
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 39

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW LOCL

CONST 1995

$

178

FED SHARE $

160

GA. SHARE $

8

0TH SHARE $

10

MUSCOGEE sR 22 SPUR/COLUMBUS@ scHATULGAMi&tff:icL sIGNALslti

342630 INTERSECTION IMPROVEMENT / SA.f~'l'yj}( /

'

PROJECT MILEAGE : ; 00 - EXISTd~ts: 0 /PROPOSED ~ks: 0

STATUS:

MANAGER: GORDON BROWN

....=,:::: ,(:/:::/

MUSCOGEE/COLUMBUS SGN 11-,i:fafaj BtrLITIES

(DOT BUY R#'l/93)

COLUMBUS TIP# 93-SR-2004 CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW 1993 UNDERWAY

CON.ST 1995

$

199

FED SHARE $

159

GA. SHARE $

30

0TH SHARE $

10

MUSCOGEE 13TH STREET BRIDGE oli:MJrTTAHOOCHEE RIVER

3502 60 . PRELIMINARY ENGINEERING::/\~EW CONSTRUCTION

}{::{:(

PROJECT MILEAGE : .60 MANAGER: BEN BUCHAN (M)

EX=I::S:;:;:T;::: .

LANES:

0

/PROPOSE:=:O::=iLA....N...ES:

4

STATUS: HOLD FOR CONST FUNDING; LOcAt

COLUMBUS TIP f 78-BR-1001
CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1976 UNDERWAY

ROW LOCL

CONST 1997

$ 8300

FED SHARE $ 6640

GA. SHARE $ 2490

0TH SHARE $ 4150

MUSCOGEE BUENA VISTA RD-PH II FM ANDREA 350685 RECONSTRUCTION & WIDENING FROM
PROJECT MILEAGE : 1.35 MANAGER: BEN BUCHAN (CM) STATUS: SIGNED 4/27/88 FOR ROW AND UTILITIES
MUSCOGEE SR 22 SPUR/MACON RD FM RIGDON RD TO CODY 350690 INTERSECTION IMPROVEMENT/ RECST. OR REHAB.
PROJECT MILEAGE : .65 - EXIST. LANES: 4 /PROPOSED MANAGER: B FERGUSON STATUS: SIGNED 1/18/89 FOR UTILITIES AND 50% ROW COST.

f 86-SR-2005
& 2
FUND SOURCE: SURFACE TRANSPORT.
FE:.D::;.E--R-A-L. HIGHWAY ADMIN FUNDS

J1t, C~LUMBUS

# 86-SR-1001

)C()NG DISil\3 & 2

:sdw&f '. FUND

suRFAcE TRiillitgff'.

FEDEiAi,=ittGHWAY JiliM1NJtuNBs

PE 1994

UNDERWAY

ROW LOCL

CONST 1996

$ 3543

FED SHARE $ 2834

GA. SHARE $

709

0TH SHARE $

PE 1992 UNDERWAY

ROW 1995

$ 1500

CONST 1997

$ 1507

FED SHARE $ 1206

GA. SHARE $

301

0TH SHARE $

MUSCOGEE BUENA VISTA RD/COLUMBUS FM WYNNTON RD SE TO ILLGES RD 350796 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 1.66 MANAGER: BILL MOSKAL (M) STATUS: COLUMBUS/MUSCOGEE SIGNED FOR ROW & UTILITIES 11-20-91.
MUSCOGEE 19TH ST FM 2ND AVE/SR 85 TO TALBOTTON AVE (OLD&NEW LOC] 350800 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .30 MANAGER: BILL MOSKAL (C) STATUS: CO SGN 2-4-92 ROW UTIL & PE; BIBB CITY SGN 12-6-91 ROW & UTL

J,ji~#iC2oib,>.

.&=:::='3 :=,:;:

...

1
FUND SOURct'.f::~&~~CE TRANSPJmgs FEOERAL<itl:GH?tAY ADMIN FUNDS.

PE 1992 UNDERWAY

ROW LOCL

:;c::=:/tONST 1997

$ 3800

FED SHARE$ 3040

GA. SHARE$

760

0TH SHARE$

COLUMB::;!I\\t!P t 86-IN-468d J
CONG DIST. 2
FUND souRcE: suRFAEl[4~sPORT.
FEDERAL HIGHWAY @MJN FUNDS

PE NONE

$

ROW LOCL

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0
2480 1984
496

COUNTY P. I.NO.

. DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MUSCOGEE SR 22 SP/MACON RD FM WOODRUFF-FARM 350870 RECONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE : 3.43 MANAGER: D. CHURCH (M) STATUS: SEND LGPA IN 1996

80

COLUMBUS TIP t 93-BR-1002

CONG DIST. 3

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 40

FISCAL --YEAR

COST ESTS

PE 1992 ROW 1996 CONST

.UNDERWAY $ 3000 AFTER 97

MUSCOGEE SR 22 SP/MACON RD@ BULL

350875 REHAB. OF THE-EXISTING o~.iuu~

D: PROJECT MILEAGE : .00

MANAGER:

CHURCH (M)

STATUS: SEND LGPA IN 1995

MUSCOGEE SR 22 SP FM REESE 350880 RECONSTRUCTION & WI:DEl~it~G/:fR.OM
PROJECT MILEAGE : MANAGER: D. CHURCH STATUS: SEND LGPA IN 1996

COLUMBUS TIP t 93-BR-1001
CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
COLUMBUS TIP t 92-SR-2001
CONG DIST. 3
FUND SOURCE: NAT'L HIGHWAY FEDERAL- HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1997

$

490

FED SHARE $

392.

GA. SHARE $

98

0TH SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY $ 2000 AFTER 97

MUSCOGEE CUSSETA/OLD CUSSETA- RD/CR 62 FM FT BENNING DR TO STA6Jf8U 350890 RECONSTRUCTION-& WIDENING FROM 2 LANES .TO 5 LANES . )':
PROJECT MILEAGE : 1.72 MANAGER: BILL MOSKAL STATUS: SEND LGPA WHEN PROJECT IS ADDED TO .CWP

MUSCOGEE SOUTH RIVERWALK BICYCLE/PEDESTRIAN FACILITY IN dbLUMBUS

371010 BICYCLE/PED.- FACILITY / ENHANCEMENT

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED

MANAGER: MEG BRYSON

.

STATUS: TO BE DONE BY CONTRACT

MUSCOGEE EQUIP. REBUILD, FURNITURE, TIRE LEASE 3D3014 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM
MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

MUSCOGEE EQUIP. REBUILD, TIRE LEASE, FUEL BAY CONSTRUCTION 3D3015 TRANSIT PROJECTS/ CAPITAL.
FUNDS RECIPIENT: COLUMBUS PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

t 86-SR-2009
:<:::::;:>:
FUND SOURCE: SURFACE TRANSPORT. FEDERAL-HIGHWAY ADMIN FUNDS
COLUMBUS i i l t 94-0T-2001
::::<::Q~t? DIST{:2' & 3
FU~;: 121t=i== TRANS. ENHJlliEia>
FEDtm:rnr ,:,;. GHWAY iiliMIN itiNDif

PE 1995 ROW LOCL CONST

$ 109 AFTER 97

PE LOCL
ROW LOCL
CONST 1996 $ FED SHARE $ GA. SHARE $ 0TH SHARE $

3255 2604.
651'

3_ :t.)fa)(?
FUND SOURciilal~
FEDERAL<!.tRANSiT

1995

$ 201

FED SHARE$

161

GA. SHARE$

20

0TH SHARE$

20

CONG DIST. =':;3 & 2 FUND SOURCE: URB~:@m;IT
FEDERAL TRANSIT .aj:>ijIN FUNDS

CAPITAI. 1996

$

196

FED SHARE$

157

GA. SHARE$

20

0TH SHARE$

20

,,

,.

IZIJ'3m

~


l!!!fflffl!I

~

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MUSCOGEE PUBLIC TRANSIT SERVICE FOR COLUMBUS AND'MUSCOGEE COUNTY 3D3017 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: COLUMBUS PUBLIC MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

MUSCOGEE PUBLIC TRANSIT SERVICE FOR coLm&;ti'.f:\i'JH'.MUscoGEE .86bNTY 3D3018 TRANSIT PROJECTS / OPERATIONS , /:{(/}
FUNDS RECIPIENT: COLUMBUS PUBiic:'ffilllisIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

CONG DIST. 3 & 2
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 41

FISCAL YEAR

COST ESTS

OPERATING 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

2434 730 3
1707

OPERATING 1996 $ FED SHARE $
GA. SHARE $ 0TH SHARE $

2531 734 7
1804

MUSCOGEE ELDERLY AND DISABLE~\iif&f~s AND EQUIPMENT 3V1017 TRANSIT PROJECTS / CAPitAI';,.
FUNDS RECIPIENT: AGENCIES'(fN COLUMBUS MANAGER: STEVE KISH STATUS:

CONG DIST. 3 & 2

CAPITAL 1995

$

41

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

33

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

MUSCOGEE ELDERLY AND DISABLED VEHICLES AND 3V1018 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN COLUMBUS MPO AREA MANAGER: STEVE KISH
STATUS:

DIST. 3 & 2

CAPITAL 1996

$

42

SOURCE: ELDERLY & DISABLED FUND FED SHARE$

34

~~q~~~- TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
. PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

PEACH 311540
STATUS:

I-75@ SR 96 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. LANES: 2 MANAGER: J. GARLAND (M) SEND LGPA IN 1995

CONG DIST. 2
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 42

FISCAL YEAR

COST ESTS

PE 1993 ROW 1996 CONST.

UNDERWAY

$

912

AFTER 97

PEACH 311780
STATUS:

I-75: CR 182/WHITE ROAD OVER BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: B FERGUSON REQ PEACH DO UTIL

CONG DIST. 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW 1995

$

1

CONST 1996

$

139

FED SHARE $

125

GA. SHARE $

14

0TH SHARE $

PEACH 322380
STATUS:

SR 49@ BIG INDIAN REPLACEMENT OF THE PROJECT MILEAGE : .35 MANAGER: GORDON BROWN PEACH COUNTY SIGNED 9-14-92

CONG DIST. 3 & 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS-

Gii:MF PEACH

SR 42 FM NEAR OLD FT VALLEY RD EAST To sR 4 9 sw oF

sif -----.-., -

331940 _ CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.

,..,,.}{doNG DIST. 3

PROJECT MILEAGE : .47

.:::::/?:/

MANAGER: GORDON BROWN

::-FUND SOURCE: SURFACE TRANSPORT.

STATUS: COUNTY SGN 1-14-92 PUB

lfE.P~. HIGHWAY ADMIN FUNDS

PEACH 371250.
STATUS:

FORT VALLEY DEPOT, ' LANDSCAPING & PEDESTRIAN _WAYS\.

MISCELLANEOUS--IMPROVEMENTS / ENHANCEMENT

PROJECT MILEAGE: .00 MANAGER: H. SUTHERLAND

EXIST.

LANES:

0

/PROPOSED

LANESj

@]/?'"

LGPA TO BE DONE BY CONTRACT

/:qQNG DI$!)!~'
FUND ibtffidt: TRANS.. ENHiilltt/> FEoifiliidb:GHWAY ru5Mrn(i6ifos

PE 1992

UNDERWAY

ROW 1994

$

5

CONST 1995

$

730

.FED SHARE $

584

GA. SHARE $

146

OTB.SHARE $

PE 1993 UNDERWAY

ROW 1995

$

300

CONST 1996 $ 292

FED SHARE $

234

GA. SHARE $

58

OTB SHARE $

PE 1996 $ ROW 1996 $ CONST 1996 $
FED SHARE$.:
GA. SHARE$ OTH.SHARE $

20 86 175 140 21-56

PEACH 3B1234
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PEACH MANAGER: STEVE KISH

::;} ROBINS TIP i } i

;~f; ;~ARE : 'ONG DIST. 2 ,,&}3\ SOURci]:iibfu TRANSIT

: 9 rE~TIN;E~9

51_ 30

FEDElUU, ,j~~fT _ADMIN FUNDS_({

GA. SHARE $

0TH SHARE $ -

21 .

PEACH 3B1235
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE_

TRANSIT FACILITIES/ OPERATIONS

,

FUNDS RECIPIENT: PEACH

MANAGER: STEVE KISH

W. ROBINS\.TIP t
_ CONG DIST. \2 & 3

OPERATING 1996

$

54

ADMI~ FUND SOURCE: RuRA.t:iilisIT

FEDERAI,, TRANSIT

FUNDS

FED SHARE$

32

GA. SHARE$

0TH SH~$

22

mmm

m!l!:ffll

l!!'J!!l!l'l'll

!!!!!l!!!l'l!I


ll!!!'!!!!'!!!!

m!!!!!!I

~

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

PEACH 3C2234
STATUS:

ONE CONV. VAN/LIFT, ONE STANDARD TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: PEACH MANAGER: STEVE KISH LGPA NOT APPLICABLE

W. ROBINS TIP t
CONG DIST. 2 & 3
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 43

FISCAL YEAR

COST ESTS

CAPITAL 1995

$

54

FED SHARE$

43

GA. SHARE$

6

0TH SHARE$

5

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

PIKE 322100
STATUS:

REALIGN SR 362/WILLIAMSON@ PINE;HARV.ARP;2ND DIST;WILLIAMSON

INTERSECTION IMPROVEMENT / SAFETY

. . : ....

PROJECT MILEAGE : .11 - EXIST. LANES: 2 /fRQPOSED LANES: 2

MANAGER: GORDON BROWN

. ,:;:;:)\:

REQ PIKE COUNTY & WILLIAMSON DO UTILIT!i!:s,':?f~J.-93

CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

~~~20
STATUS:

~Pi!g,:~:~R;: ~~~i~~;T~~~~Rtbi.tJ~lf~t!oc:~!D rJlli$~-
PROJECT MILEAGE : .00
MPIAKNEAGCEORU: NTGYORDSIOGNNEBDROW1N-6-94::.-:f-:-:-:-:-~:-:: Jt6W, UTILITIES &

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PIKE 370761
STATUS:

CR 51@ NW CTY LIMITs)fiidi.oN@ ELKINS.CREEK

REPLACEMENT OF THE EXIST:X~G BRIDGES(S). NO ADDEO

PROJECT MILEAGE : .00
~~G~~~N~~~~:-!!0~tiow

t

&rtLITIEs

&

,. -.
FPii(qlfiiY!huioN,,, .

CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 44

FISCAL YEAR

COST ESTS

PE NONE ROW 1995 CONST

$

0

$

165

AFTER 97

PE 1995

$

6

ROW LOCL

CONST 1997

$

382

FED SHARE $

306

GA. SHARE $

76

0TH SHARE $

PE 1995

$

5

ROW LOCL

CONST 1996

$

325

FED SHARE $ 260

GA. SHARE $

65

0TH SHARE $

11!1!1!!!!!!! ~ l!!!!!!'!!!!J

l!l!!'!!!!!!'l ~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

PULASKI 331620
STATUS:

SR 230@ SOUTH PRONG BIG TUCSAWHATCHEE REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .38 MANAGER: GORDON BROWN PULASKI REFUSED 10-5-92.

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 45

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1995

$

15

CONST 1996

$

500

FED SHARE $

400

GA. SHARE $

100

0TH SHARE $

PULASKI 332030
STATUS:

SR 11/US 341 OVER TOWN REHAB. OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: B FERGUSON SEE #322170

PE NONE $

0

CONG DIST. 8

ROW 1994 $

0

GRIP PROJECT

CONST 1996 $ 246

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

197

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

49

322170 IS AN ASSOCIATED PROJECT.

0TH SHARE$

PULASKI 3Bl239
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: PULASKI MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1995 $

22

FUND SOURCE: RURAL TRANSIT

FED SHARE$

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

9

PULASKI 3Bl240
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PULASKI MANAGER: STEVE KISH

DIST. 8

OPERATING 1996 $

24

SOURCE: RURAL TRANSIT

FED SHARE$

14

TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

10

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

SCHLEY 321987
STATUS:

SR 26 PASSING LANES @4 LOCATION
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 5.43 MANAGER: GORDON BROWN DOT PAY SCHLEY & MACON COUNTIES

CONG DIST. 2 GRIP PROJECT FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 46

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1994

UNDERWAY

CONST 1995

$ 2222

FED SHARE $ 1778

GA. SHARE $

444

0TH SHARE $

B!Je

l'J!!!!!ffl!I

~

11'!!!!!!'!!1


l!l!!!!!!!'JI

~

~

;,;.,. -~+l
f.

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

SPALDING TAYLOR ST/GRIFFIN FM 16TH ST TO 10TH ST\

32164 0 RECONSTRUCTION & WIDENING FROM 4 LANES Tl:).:;: 5 LANES.

PROJECT MILEAGE : .70

MANAGER: J. GRAYBEAL

STATUS: D.O.T. TO PAY UTILITY COSTS FOR

~ 2-3-89

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS 342480 IS AN ASSOCIATED PROJECT.

STATUS:

RECONSTRUCTION & WIDENING FROM PROJECT MILEAGE : 2.00
MANAGER: J. GRAYBEAL (CJ .... . .... GRIFFIN SGN FOR UTIL 4-124:~3':'{$.P}\I.DI_NG REFUSED 2-22/!fa

CONG DIST. 3
FUND .SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 47

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$ 1203

FED SHARE $

962

GA. SHARE $

241

0TH SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY
$ 3428 AFTER 97

SPALDING sR 155 NB MP 11.0/sPAhBJh~o.25/HENRY;sB MP 1.6-3/iYfilM~Y
331520 ADDITION OF A PASSING LJ\NE.
PROJECT MILEAGE : 2. 90 .....

MANAGER: GORDON BROWN(M) . .

.. .. ,. ..

STATUS: HENRY SGN 5-15-89 FOR UTILITfil:'$).$.PALDING.<:!:!;tti'J.$.itti.\2::..n::::~l-

CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY

$

15

AFTER 97

SPALDING SR 92 OVER UNNAMED CREEK@ MP 5.1 NEAR EDWARDS RD 332050 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED
PROJECT MILEAGE : .00 MANAGER: GORDON BROWN(M) STATUS: SEND LGPA IN 1995

SPALDING 342480
STATUS:

SPALDING SR 3/US 19/GRIFFIN FM SR 92 N/CS 804 N TON/CR 18

342621 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.

PROJECT MILEAGE : 1.52

MANAGER: J. GRAYBEAL (M)

STATUS: SGN 9/25/90 FOR ROW & UTILITIES

T&S PROJECT

SPALDING SR 85 CONN FM SR 16 (SPALDING)N TO CR 168 IN BROOKS/FAYETTE 34280X RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS:

: coNG DIST. 3

FUND SOURCE: BRIDGE PROGRAM

FEDERAL ::-:-:

HIGHWAY

ADMIN

FUNDS

PE 1994

UNDERWAY

ROW 1996

$

1

CONST 1997

$

352

FED SHARE $

282

GA. SHARE $

70

0TH SHARE $

PE 1992

UNDERWAY

ROW 1995

$

878

CONST 1996

$

723

FED SHARE $

651

GA. SHARE $

72

0TH SHARE $

{bNG DIST. 3.,: :;:;::::i=:::==::
=Qfg:p PROJE9,'.t:/:i/

FUND SOUR,9~:\)iiY'i'Y . SAFETY

.. ,

FEDEMI,.,:1{:i:eiii~A.Y ADMIN FUNDS,:=

PE 1993

UNDERWAY

ROW 1995

$

200

,::::::::"CONST 1997

$

893

FED SHARE $

804

GA. SHARE $

89

0TH SHARE $

CONG DIST.::::3
FUND SOURCE: suRFAt~[fkANsPORT.
FEDERAL HIGHWAY JIDMi~ FUNDS
342800 IS AN ASSOCIATED PROJECT.

PE 1996 ROW CONST

$

0

AFTER 97

. AFTER 97

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 48

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. -------------.-P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M--EN-T-S---------------------------)-[E-A-R--------E-S-T-S---

SPALDING RESTORE OPERA HOUSE& CREATE VISITORS

GRIFFIN

PE 1995

$

150

371230 MISCELLANEOUS-IMPROVEMENTS/

CONG DIST. 3

ROW 1995

$

100

PROJECT MILEAGE : 00 - EXIST.

CONST 1996

$

999

MANAGER: BOB MOORE

FUND SOURCE: TRANS. ENHANCE.

FED SHARE$

799

STATUS: LGPA TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

49

0TH SHARE$ 249

"

,J

I!!!!!!!!!!

l!l!C'!l!ffl l!!l!l'!mll l!!!'l'!!l ~ ~

~I~if"''-,+..!.


GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 49

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

---------------------------------------------------------------------------------------------. ----------------------------------. ----

STEWART RESTORE RICHLAND DEPOT; BEDINGFIELD

PE LOCL

371260 MISCELLANEOUS IMPROVEMENTS/ ENHANCl~Ml~N'.r?,

CONG DIST. 2

ROWNONE $-

0

PROJECT MILEAGE : .00 - EXIST.

CONST 1997

$

610

MANAGER: H. SUTHERLAND

FUND SOURCE: TRANS. ENHANCE.

FED SHARE$ 488

STATUS: LGPA TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

122

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

SUMTER 321750
STATUS:

SR 3ojus 280 FM FELDER ST/CR 307 TOW RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : 1. 80
MANAGER: J. GARLAND SUMTER SGN 4/89 UTILITIES & AMERICUS

DR CONG DIST. 2 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

SUMTER 322197
STATUS:

SR 3/US 19 @MUCKALOOCHEE REHAB. OF THE EXISTING BRIDGE PROJECT MILEAGE : .00 MANAGER: M GANNAWAY (M) SUMTER COUNTY SGN 2-3-92

SUMTER 322310
STATUS:

SR 3/US 19@ BEAR ~"-'~~~-n REPLACEMENT OF THE PROJECT MILEAGE : .00 MANAGER: M GANNAWAY (M) SUMTER COUNTY SIGNED 2-3-92

SUMTER 322430
STATUS:

SR 27/US 280 EB FM MP 6.7-8.2;WB
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.94 MANAGER: GORDON BROWN(M) SUMTER SIGNED FOR UTILITIES 8-8-91.

CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM J. FEDERAL HIGHWAY ADMIN FUNDS 322195 IS AN ASSOCIATED PROJECT.
CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 322195 IS AN ASSOCIATED PROJECT.
DIST. 2
SOURCE: NAT!L HIGHWAY HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 50

FISCAL YEAR

COST ESTS

PE 1992 -UNDERWAY

ROW 1992 UNDERWAY

CONST 1995

$ 3674

FED SHARE $ 2939

GA. SHARE $

735

0TH SHARE $

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1997

$

160

FED SHARE $

128

GA. SHARE $

32

0TH SHARE $

PE 1993

UNDERWAY

ROW NONE

$

0

CONST 1997

$

142

FED SHARE $

114

GA. SHARE $

28

0TH SHARE $

PE 19.92 ROW 1997 CONST

UNDERWAY

$

25

AFTER 97

SUMTER 322690
STATUS:

SR 27 AT SR 49-IN AMERICUS

INTERSECTION IMPROVEMENT/ SAFETY

PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES,:\J)::};::=

MANAGER: BURT RIDDLE REQ AMERICUS DO UTILITIES 1-24-94

o-t::o:;::=:::/:,:}:

,,GONG Disihfa
FUND;:J\9.~~t: NAT'. L FEDE:M:L,HIGHWAY

PE 1994

UNDERWAY

ROW 1995

$

10

CONST 1996

$

289

FED SHARE $

289

GA. SHARE $

0TH SHARE $

SUMTER 331540
STATUS:

AMERICUS NORTH BYPASS FM SR 3/US 19 TO CR 297 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE: 3.23 MANAGER: GORDON BROWN SUMTER SGN 5-17-91 FOR UTIL;AMERICUS SGN 5-28-91 CITY UTIL.

PE 1992 UNDERWAY

! ROW LOCL
t:~~~iiliff~~~~NTRANSPORT'){::: ,)CONSi:~9~=-

2067 1654

413

0TH SHARE$

SUMTER ANDERSONVILLE. NATL PRISONER/WAR MUSEUM ENTRANCE RD/SEE MACON 37095X UNKNOWN/ UNKNOWN
PROJECT.MILEAGE .00 - EXIST. LANES:, 0 /PROPOSED LANES: 0
MANAGER: STATUS:.

CONG .DIST. =::2 FUND SOURCE: TRANi~:!i 1ilui~cE.
FEDERAL HIGHWAY ADMik FUNDS

PE LOCL

ROW NONE $

0

CONST.1995

$

0

FED SHARE$

GA. SHARE$

0TH SHARE$

lll'!l'!!l!I

~

~

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
_PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

SUMTER 3Bl249
STATUS:

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF AMERICUS MANAGER: STEVE KISH

CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

SUMTER 3Bl250
STATUS:

CITY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: CITY MANAGER: STEVE KISH

CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

SUMTER 3C2249
STATUS:

ONE STANDARD VAN AND TRANSIT FACILITIES/ FUNDS RECIPIENT: CITY MANAGER: STEVE KISH
LGPA NOT APPLICABLE

CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 51

FISCAL YEAR

COST ESTS

OPERATING 1995 $

75

FED SHARE$

44

GA. SHARE$

0TH SHARE$

31

OPERATING 1996 $

78

FED SHARE$

46

GA. SHARE$

0TH SHARE$

32

CAPITAL 1995

$

21

FED SHARE$

17

GA. SHARE$

2

OTH,_ SHARE $

2

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

_GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TALBOT 322300
STATUS:

US 80 @ BARFIELD CREEK E/TAYLOR CO LINE\,.

REPLACEMENT OF THE EXISTING BRIDGES (S). -~Q ADDED LANES.

PROJECT MILEAGE : . 50

,., , ,-,-:-

MANAGER: GORDON BROWN TALBOT REFUSED 2-16-93; NO UTILITY cos'l6:tW6:D 5-18-93

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TALBOT 371280
STATUS:

CR l 7yGORMAN ROAD @ CSX RAILROAI>:i{{!!:8liV LMT OF TAiijTTON
RPREPOLJAECCETMMENILTEAOGFETH: E . E21XISTING B~-t,.,p.,._<..,.,;.,.,_.,,_P,_,_i._.~_ {Sj. NO ADDED !Js.

MANAGER: GORDON BROWN (M) _.,:;:,:;::,:,,,,,,:;::;;,:::,,:;:;,:,,- ._

'::'=:::=:::=:::\

TALBOT SGN ROW/UTL/DETOU~$)fi/~:S;cITY SGN 9/93 ROw,gf'.ijtpET'R

TALBOT 3Bl254
STATUS:

=\\rt
COUNTY OPERATED PUBLI6ii$~SIT SERVICE TRANSIT FACILITIES/ OPEMT.IONS FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH

CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

TALBOT 3B1255
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILiTIES / OPERATIONS FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH

DIST. 2
FUND SOURCE: RURAL TRANSIT fll:P.)!!~ TRANSIT ADMIN FUNDS

TALBOT 3C2254
STATUS:

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TALBOT MANAGER: STEVE KISH LGPA NOT APPLICABLE

22-Feb-1994 Page 52

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1995

$

4

CONST 1996

$

818

FED SHARE $

654

GA. SHARE $

164

0TH SHARE $

PE 1994

UNDERWAY

ROW LOCL

CONST 1997 _ $

374

FED SHARE$

300

GA. SHARE$

75

0TH SHARE$

OPERATING 1995 $

75

FED SHARE $

42

GA. SHARE $

0TH SHARE $

33

OPERATING 1996

$

77

FED SHARE $

43

GA. SHARE $

0TH SHARE $

34

1995

$

32

FED SHARE$

26

GA. SHARE$

3

0TH SHARE$

3

"

l!!l!!!!!!ll

~

~

~

l!l!!!!!!!l

~

~

~

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TAYLOR 322010
STATUS:

SR 3@ FLINT RIVER/ALSO UPSON CO REHAB. OF THE EXISTING BRIDGE(S). FROM PROJECT MILEAGE : .20 MANAGER: B FERGUSON UPSON SGN 6/92 UTIL;TAYLOR REFUSED

TO 4 LANES.

CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 363558 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 53

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1996

$ 2137

FED SHARE $ 1710

GA. SHARE $

427

.OTH SHARE $

TAYLOR 32272X
STATUS:

SR 3/US 19 FM SR 240 TO CR RECONSTRUCTION& WIDENING ~o,nM'?':~'n~~
PROJECT MILEAGE : . 00 MANAGER: UNKNOWN

PE 1994

CONG DIST. 2

ROW 1997

GRIP PROJECT

CONST

FUND SOURCE: GOVERNOR'S RD IMP PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

UNDERWAY

$

0

AFTER 97

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TROUP 311300

SR 219 FM 800' S/I-85 TO 300' N/I-85 ., .. RECONSTRUCTION & WIDENING FROM 2 LANES TQ\.4 LANES. PROJECT MILEAGE: .42

STATUS: =t:E~~uiTYG~~g 3/31/89 FOR UTILITii~ll!lsJth.

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 331530 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 54

FISCAL YEAR

COST ESTS

PE 1991-- UNDERWAY

ROW 1993 UNDERWAY

CONST 1996 $ 2244

FED SHARE $ 1795

GA. SHARE $

449

0TH SHARE $

TROUP 31171X
STATUS:

CONG DIST. 7 & 3
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE

$

0

ROW NONE $

0

CONST 1997 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

TROUP 31172W
STATUS:

CALL BOXES ON I-185 if4:l$i)22/MUSCOGEE TO-I-85 siti'MoicoGEE

UNKNOWN / NEW CONSTRUCTJ'.Q~



PROJECT MILEAGE: .oo - ~kfsT. LANES: 0 /PROPosi6.Imis: 0

MANAGER: BURT RIDDLE

. . ..

CONG DIST. 3 & 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE

$

0

ROW NONE $

0

CONST 1997 $

-o

FED SHARE$

GA. SHARE$

0TH SHARE$

TROU~ 321720
STATUS:

SR 1@ UNNAMED TRIBUTARY TO WEST POINT LAKE REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : .30 MANAGER: M GANNAWAY COUNTY SIGNED 11-17-87 FOR UTILITIES

::::C::::::::::::,-.,n,_,,., DI ST . 7
PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
:3:G292-6':S. AN ASSOCIATED PROJECT.

PE 1992 ROW 1995 CONST

UNDERWAY

$

17

AFTER 97

TROUP 322230
STATUS:

SR 14 N&SB FM MP 3.87-5.37; NB MP 7.07-8.41
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.84 MANAGER: GORDON BROWN(M) TROUP SIGNED 9-30-92 BUT NOTED THEY HAVE NO UTIL

PE 1992 ROW 1997
CONST

UNDERWAY

$

400

AFTER 97

TROUP .. 331530'
STATUS:

SR 219 FM S/CR 91- TO 1000' N/CR 304 [EXCEP IR..-85-.l (295)] RECONSTRUCTION &:WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .78 MANAGER: J. GARLAND COVERED UNDER I-85-1(295), SGN 3-31-89 FOR UTILITIES

TROUP 331800'
STATUS:

SR 14' SW OF HOGANVILLE@ SHOAL CRI<

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED ~ES.

PROJECT MILEAGE : .25

. -

MANAGER: GORDON BROWN

TROUP SIGNED 9-30-92 BUT NOTED THEY HAVE NO UTIL INVOLVED

PE 1992~ UNDERWAY

I{1~NG DIST. 7

ROW 1993 UNDERWAY

:-::::::,:/tNST 1995

$ 1174

FUND souRcil:i\\jdfu.AcE TRANsPciJfo:

FED SHARE $

939

j ; ~ ~ i ~ J J i l ' ! ! s ~ ~ ! : E ~ ~ ~ $ . B : f

GA. SHARE $ 235 0TH SHARE $

CONG DIST.":7
FUND SOURCE: . BRit:>qtf.~OGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY '

ROW 1995 $

15

CONST 1995

$

681

FED SHARE$

545

GA. SHARE.$

136

0TH SHARE$

.

~

~

~

~

~

~

~

COUNTY P.I.NO.
TROUP 342410
STATUS:

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

TROUP 370907
STATUS:

CR 418/MOBLEY BRIDGE RD @ YELLow(JiBID:W cruc TRIBJf)&y RPREPOLJAECCETMEMNILTEAOGFETH: E E0X0 ISTING B.R..:.t.P..l.t.f..f.i...s.{.S) NO ADDED LANES.
MANAGER: GORDON BROWN TROUP COUNTY SGN 10-6-92 ijgW,fotiTILITIES &

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TROUP 3B1259
STATUS:

COUNTY OPERATED PUB~i8:\i'.f~~IT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TROUP ..... .
MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

TROUP 3B1260
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TROUP MANAGER: STEVE KISH

TROUP 3C2259
STATUS:

TWO STANDARD VANS AND TWO MOBILE RADIOS TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TROUP MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 7 FUND SOURCE: RURAL TRANSIT F~DERAL TRANSIT ADMIN FUNDS
orsll

22-Feb-1994 Page 55

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW 1993 UNDERWAY

CONST 1995 $ 252

FED SHARE $ 227

GA. SHARE $

25

0TH SHARE $

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$

485

FED SHARE$ 388

GA. SHARE$

97

0TH SHARE$

OPERATING 1995 $

72

FED SHARE$

43

GA. SHARE$

0TH SHARE$

29

OPERATING 1996 $

74

FED SHARE$

44

GA. SHARE$

0TH SHARE$

30

1995

$

42

FED SHARE$

34

GA. SHARE$

4

0TH SHARE$

4

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

TWIGGS 321990
STATUS:

SR 96 BT HOUSTON CL & I-16( ADDITION OF A PASSING LANE. PROJECT MILEAGE: 6.15 MANAGER: GORDON BROWN DOT TO PAY UTIL 11/90--DIST

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 56

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$ 2433

FED SHARE $ 1946

GA. SHARE $

487

0TH SHARE $

TWIGGS 331840
STATUS:

SR 96 NB FM MP 16.2 - 17.8; ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.06 MANAGER: GORDON BROWN TWIGGS COUNTY REFUSED

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1995

$

93

CONST 1996

$ 1328

FED SHARE $ 1062

GA. SHARE $

266

0TH SHARE $

TWIGGS 3Bl443
STATUS:

COUNTY OPERATED TRANSIT. FACILITIES/ FUNDS RECIPIENT: TWIGGS MANAGER: STEVE KISH

CONG DIST. 11 & 8

OPERATING 1995

$

21

FUND SOURCE: RURAL TRANSIT

FED SHARE $

13

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

8

TWIGGS 3Bl444
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TWIGGS MANAGER: STEVE KISH

DIST. 11 & 8

OPERATING 1996

$

22

SOURCE: RURAL TRANSIT

FED SHARE $

13

TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

9

. t

,,
r

l!llln!l!I

~

~

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 1

FISCAL YEAR

COST ESTS

ATKINSON SR 89/US 441 FROM CR 101 TO SR 4223BX UNKNOWN/ UNKNOWN
PROJECT MILEAGE ,00 - EXIST. MANAGER: STATUS:

PE 1995

$

0

CONG DIST. 8

ROW

AFTER 97

0

GRIP PROJECT

CONST

AFTER 97

FUND SOURCE: GOVERNOR'S RD IMP PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

422380 IS AN ASSOCIATED PROJECT,

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 2

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

--------------------..

,

BEN HILL SR 90@ ALAPAHA RIVER/ALSO TURNER CO

------------ --------------C-O-M--M-E-N-TS---------------------------'Y--EA--R--------E-S-T-S--

PE 1992

UNDERWAY

431040 REPLACEMENT OF THE EXISTING BRIDGES(S).

CONG DIST. 8

ROW 1995

$

1

PROJECT MILEAGE: .00

CONST 1996

$

718

MANAGER: J. LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

574

STATUS: BEN.HILL SGN. 1-7-92 & TURNER SGN

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

144

0TH SHARE $

BEN HILL SR 107/US 319 OVER STURGEON 442580 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .00 MANAGER: J. LINDSEY STATUS: SEND LGPA IN 1995

CONG DIST. 8 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW 1996

$

1

CONST 1997

$

611

FED SHARE $

489

GA. SHARE $

122

0TH SHARE $

BEN HILL SR 90 OVER ALAPAHA 442590 REPLACEMENT OF THE
PROJECT MILEAGE : .00 MANAGER: J. LINDSEY STATUS: BEN HILL REFUSED TO COMMIT

PE 1995

$

5

CONG DIST. 8

ROW 1996

$

1

CONST 1997

$

170

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

136

\:

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

34

0TH SHARE $

~ t s / . BEN HILL EVERGREEN CEMETERY ROAD OVER TURKEY CREEK IN FITZGERAflgJ::
450420 REPLACEMENT OF THE EXISTING BRIDGES {S). NO ADDED

PROJECT MILEAGE : .50

MANAGER: J. LINDSEY

..

STATUS: CITY SGN 10-18-93 ROW, UTIL, DETOURS; COUNTt Jl,/:if$fi:kfo-20-93

1: :}JONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM ~.~U~M~. HIGHWAY ADMIN FUNDS

PE 1995

$

10

ROW LOCL

CONST 1996

$

180

FED SHARE $

144

GA. SHARE $

36

0TH SHARE $

()

~


~

~

g~-e..@

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BROOKS 421720
STATUS:
BROOKS 421722
STATUS:
BROOKS 442680
STATUS:

SR 133 FM W/CR 276 TOE. OF WITHLACOOCHEE RVR/LOWNDES
RECONSTRUCTION & WIDENING FROM 2 LANES T0':-.4 LANES.
PROJECT MILEAGE : 1.60
~A~:~~K~ ~gL~~i~Hil-8-90; LOWNDES SIG~ift:Jfat5/90 - UTIL.
~~J ~FL;~i~~I:;;:r~~~g!~~.r,1,~:~-:j ft..Es
~~i~~:rig~;~~~Hr:-a-~ptll[i;~ SGN 12/5/90

~:i~~~~~:~LY CR 275 @ CAT CREE~

4 MILES SOUTH OF/6~~~~:

REPLACEMENT OF -THE EXISTING BRIDGES($) NO ADDED_,:wiis.

PROJECT MILEAGE : .20

.

MANAGER: J. LINDSEY

SEND LGPA IN 1997

CONG DIST. 2 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 421722 IS AN ASSOCIATED PROJECT.
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421720 IS AN ASSOCIATED PROJECT.
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 3

FISCAL YEAR

COST EST$

PE 1992

UNDERWAY

ROW 1995

$

123

CONST 1996

$ 2213

FED SHARE $ 1770

GA. SHARE $

443

0TH SHARE $

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1996

$ 4703

FED SHARE $ 3762

GA. SHARE $

941

0TH SHARE $

PE 1995 ROW LOCL CONST

$

8

AFTER 97

BROOKS 442682
STATUS:

CR 275@ PISCOLA CREEK APPROXIMATELY REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .22 MANAGER: J. LINDSEY SEND LGPA IN 1997

DIST. 2
SOURCE: BRIDGE PROGRAM HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

14

11.FTER 97

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CLAY 4Bl264
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH

CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FONDS

CLAY 4Bl265
STATUS:

COUNTY OPERATED PUBLIC TRANSIT FACILITIES/ FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH

CONG DIST. 2
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FONDS

CLAY 4C2264
STATUS:

ONE CONVERSION VAN TRANSIT FACILITIES/ FUNDS RECIPIENT: CLAY MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 2
FOND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FONDS

22-Feb-1994 Page 4

FISCAL YEAR

COST ESTS

OPERATING 1995 $

53

FED SHARE$

32

GA. SHARE$

0TH SHARE$

21

OPERATING 1996 $

55

FED SHARE$

33

. GA. SHARE $

0TH SHARE$

22

CAPITAL 1995

$

33

FED SHARE$

26

GA. SHARE$

4

0TH SHARE$

3

,,

l!l!!!!!!!!!I

~

~

~


.

COUNTY P. I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 5

FISCAL YEAR

COST ESTS

CLINCH 42242X
STATUS:

SR 89/US 441 FROM FLA STATE LINE TO CR UNKNOWN/ UNKNOWN PROJECT MILEAGE .00 - EXIST. LANES: 0 MANAGER:

FARGO/ECHOLS
0

PE 1996

CONG DIST, 8

ROW 1997

GRIP PROJECT

CONST

FUND SOURCE: GOVERNOR'S RD IMP PROGRAM

FEDERAL HIGHWAY ADMIN FUNDS

$

0

$

0

AFTER 97

CLINCH 431065
STATUS:

SR 187@ SUWANNOOCHEE CRK OFLW REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: J. LINDSEY CLINCH COUNTY REFUSED

CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1995

$

1

CONST 1996

$

275

FED SHARE $

220

GA. SHARE $

55

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COFFEE 421240
STATUS:

SR 135/ US 221/ IN DOUGLAS @ SEVENTEEN -~_ILE RIVER REHAB. OF THE EXISTING BRIDGE (S). FROM 2\LANES TO 5 LANES. PROJECT MILEAGE : .20 MANAGER: J. LINDSEY SGN CITY/DOUGLAS FOR UTIL 5-9-89; COUNt*i1Ufi#:$ED 12-6-91

COFFEE 421320
STATUS:

cib&~l~'f~yp .?\t
SR 135 FM SR 32/DOUGLAS NE TO N

RECONSTRUCTION & . WIDENING FROl-1 2/LAN!tS TO 5 LANES.:

PROJECT MILEAGE : 3.10

J;g~) ~~~:: SgN ~~~~~~yR~W/UTtiii~ii; FROM CO WILL DO

6/92

CONG DIST; 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421320 IS AN ASSOCIATED PROJECT.
CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421240 IS AN ASSOCIATED PROJECT.

COFFEE 421340
STATUS:

SR 32/DOUGLAS FH WCL~-,,~~:06 .. INCL 1-WAY PAI,J

RECONSTRUCTION & WIDENING/FROM 2 LANES TO 5 LANES:{::/:i==

PROJECT MILEAGE : 3.57 \)

MANAGER: M. REYNOLDS

):=\ ...

CITY OF DOUGLAS SIGNED 5/8/89{fq:El

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 431280 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 6

FISCAL YEAR

COST ESTS

PE 1986 UNDERWAY

ROW NONE

$

()

CONST 1995

$ 1656

FED SHARE $ 1325

GA. SHARE $

331

0TH SHARE $

PE 1992

UNDERWAY

ROW LOCL

CONST 1995

$ 2748

FED SHARE$ 2198

GA. SHARE$

550

0TH SHARE$

PE 199?.

UNDERWAY

ROW 1995

$ 2780

CONST 1997

$ 4402

FED SHARE $ 3522

GA. SHARE $ 880

0TH SHARE $

COFFEE 421345
STATUS:
COFFEE 422350
STATUS:

SR 32 FM W/CR 296 EAST TO WEST

RECONSTRUCTION & WIDENING FROM

DIST. 8

PROJECT MILEAGE : 4.13

MANAGER: M. REYNOLDS(CM)

SOURCE: SURFACE TRANSPORT.

COUNTY SGN UTIL ll-19-9l;CITY/DOUGLAS SR 135 AT MCDONALD ROAD IN DOUGLAS

~: y HIGHWAY ADMIN FUNDS

.

T:~b

~~~~~: rilt'" :~~JE~:~L,A!~~T~oo - EXIST. LANES: 0 /PROPOSED LANES::'& ):::

T~~i~D~!iRATIONS

COST EST 2-7-94 IN

9 C:ONG DisTC

.. > .

~:~ilitw:~T;if;j~~i:rr:~~ {

PE 1992
ROW 1997 CONST

UNDERWAY $ 3289 AFTER 97

PE 1994 UNDERWAY

ROW 1995

$

10

CONST 1996 $ 289

FED SHARE $ 289

GA. SHARE $

0TH SHARE $

COFFEE 431250
STATUS:

SR 135@ INTERSECTION OF CR 579; CR 146; CR 148

INTERSECTION IMPROVEMENT/ SAFETY

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: J. LINDSEY

COFFEE SGNFOR UTILITIES 5-8-92

OTO

'CONG DIST. 2_

gwl1

1

FUND SOURcil

'. SAFETY

FEDERAL ItfoHWAY ADMIN

PE 1993 UNDERWAY

ROW 1995

$

3

<CONST 1995

$

383

FED SHARE $ 34"5

GA. SHARE $

38

0TH SHARE $

COFFEE 431280
STATUS:

LANDSCAPING/ST SCAPE MASTER PLAN DWTOWN DOUGLAS (421340) LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: M. REYNOLDS CITY/DOUGLAS SGN 12-14-92 ROW/UTIL & CST OVER $850,000.

CONG DIST .:.:8
FFUEDNDERASOLUHRICGEH:WATYRAANDSM{ IfNtkFU~NcDES.
421340 IS AN ASSOCIATED PROJECT.

PE LOCL ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
1388 1110
260 538

= = ,

I

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COFFEE 442600
STATUS:

SR 158 AT SHIRLEY AVENUE IN DOUGLAS TURN LANES/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: J. LINDSEY CONTACT TRAFFIC OPERATIONS

CONG DIST. 8
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

COFFEE 450380
STATUS:

SR 206/PERIMETER RD FM SR RECONSTRUCTION & WIDENING PROJECT MILEAGE : 1.80 MANAGER: J. LINDSEY (M) COFFEE SGN 10-14-93

CONG DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL ~IGHWAY ADMIN FUNDS

22-Feb-1994 Page 7

FISCAL YEAR

COST ESTS

PE 1994

UNDERWAY

ROW 1995

$

10

CONST 1996

$

289

FED SHARE $

289

GA. SHARE $

0TH SHARE $

PE 1992. ROW 1995 CONST

UNDERWAY

$

50

AFTER 97

COFFEE 471080
STATUS:

CR 598 OVER BEAR REPLACEMENT OF THE PROJECT MILEAGE: .20 MANAGER: J. LINDSEY SEND LGPA 10/94

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1995

$

8

ROW LOCL

CONST 1996

$

111

FED SHARE $

88

GA. SHARE $

22

0TH SHARE $

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTI~G BY COUNTY FY 1995/FY 1997
COMMENTS

COLQUITT SR 37/W. CENTRAL AVE@ llTH ST NB&SB IN::MOULTRIE & SIGNALS

442490 TURN LANES/ SAFETY

PROJECT MILEAGE: .50 - EXIST. LANES: 2 /JtOPOSED LANES: 3

MANAGER: J. LINDSEY

STATUS: CITY/MOULTRIE SGN 12-23-92 ROW &

. OTO

CONG DIST. 8
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

:6klii~f: COLQUITT CR 477/COOL SPRINGS RD @ INDIAN

NE OF MOutiirE

442670 REPLACEMENT oF THE ExisTING BRIPGE/t{si No ADDED LAN'is.

PROJECT MILEAGE : .19

MANAGER: J. LINDSEY

STATUS: COLQUITT COUNTY SIGNED 10Alfa93 ioR ROW, UTILITIES dBlHouRs

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COLQUITT FM LOWER MEIGS RD IN '~6di.~~E s TO us 319 BP AND '.t&:kfkPORT
471030 BICYCLE/PED. FACILITY /t~llANCEMENT PROJECT MILEAGE : . 00 - EX{S'r. LANES: 0 /PROPO~$i~fus: 0 MANAGER: J. TOLSON
STATUS.: LGPA TO BE DONE BY CONTRACT

CONG DIST. 8 & 2
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4Bl408 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH STATUS:
COLQUITT CITY OPERATED PUBLIC TRANSIT SERVICE 4B1409 TRANSIT FACILITIES/ OPERATIONS.
FUNDS RECIPIENT: CITY OF MOULTRIE MANAGER: STEVE KISH STATUS:

DIST. 8 & 2
SOURCE: RURAL TRANSIT T:7T7 ~7 ,~ TRANSIT ADMIN FUNDS

22-Feb-1994 Page 8

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW LOCL

CONST 1995

$

125

FED SHARE $

113

GA. SHARE $

13

0TH SHARE $

PE NONE

$

0

ROW LOCL

CONST 1996

$

104

FED SHARE $

83

GA. SHARE $

21

0TH SHARE $

PE LOCL

ROW NONE $

0

CONST 1997

$

568

FED SHARE $

454

GA. SHARE $

0TH SHARE $

114

OPERATING 1995 $

38

FED SHARE$

24

GA. SHARE$

0TH SHARE$

14

1996 $

40

FED SHARE$

25

GA. SHARE$

0TH SHARE$

15

,...

id

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COOK 410420
STATUS:

I-75@ SR 37/ADEL [FM 1500 FT WEST TO INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .40 - EXIST. LANES: "MANAGER: J. GARLAND REQ ADEL DO PUB UTIL 9-30-91;

I-75)
5

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

COOK

I-75 IMPROVE SANIATION,

410600 REST AREA/ RECST. OR REHAB.

PROJECT MILEAGE : .00 -

MANAGER: J. GARLAND

STATUS: - NOT APPLICABLE

6
CONG DIST. 8
4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

COOK 410620
STATUS:

I-75 R/W FOR HEART RIGHTS-OF-WAY/ OTHER PROJECT MILEAGE : .00 MANAGER: NOT APPLICABLE

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 9

FISCAL YEAR

COST ESTS

PE 1992 ROW 1996 CONST

UNDERWAY

$

100

AFTER 97

PE 1994 . UNDERWAY

ROW 1995 $

2

CONST 1995 $ 1783

FED SHARE $ 1605

GA. SHARE $

178

0TH SHARE $

PE NONE

$

0

ROW 1995

$

300

CONST NONE $

0

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CRISP 41025X
STATUS:

I-75 FM SR 159 NEAR ASHBURN TO SR 300 RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : .00 MANAGER: B FERGUSON
LGPA NOT APPLICABLE

TURNER

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410250 IS AN ASSOCIATED PROJECT.

CRISP 410260
STATUS:

I-75 FM l MILES OF CR 117 RECONSTRUCTION & WIDENING PROJECT MILEAGE : 7.13 MANAGER: B FERGUSON
CRISP SGN 4-24-92-NtO\f,}'(j-:~!.i~;~.t~":;l'\~~-

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 410265 IS AN ASSOCIATED PROJECT.

CRISP 420605
STATUS:

SR 30/US 280 MP EB ADDITION OF A PASSING PROJECT MILEAGE : 2.50 MANAGER: J. LINDSEY CRISP COUNTY SGN 8-28-92

CONG DIST. 8
FUND SOURCE: NAT;L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

CRISP 422190
STATUS:

SR 257 NEAR CORDELE@ MIDWAY RD/CR 266 & CR 353 RECONSTRUCTION & WIDENING. NO LANE ADDITION RO'.PO:S~IY{{/
PROJECT MILEAGE ; .50 MANAGER: J, LINDSEY (M) CONTACT TRAFFIC OPERATIONS

CRISP 470841
STATUS:

CR 241@ GUM CREEK/LAKE BLACKSHEAR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED PROJECT MILEAGE: .00 MANAGER:,J. LINDSEY CRISP SGN FOR ROW, UTILITIES& NECESSARY DETOURS

CRISP 471000
STATUS:

REHAB & RESTORE THE HISTORIC DISTRICT OF CORDELE MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: J. TOLSON LGPA TO BE DONE BY CONTRACT

DIST. 8
FUND' SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
::::::::::::::i;;;:/::,.
DI~Ai ~
> FUND sbi:rncE: BRIDGE PROGili
FEDERAL HIGHWAY ADMIN FUNDS

\ g p N G D I S T . ...........

0

8

i J ...:,.&.<.,....=::2.:.:.:::.,:....:.

;~; souRcfl{~fus.
FEDERAL HIGllWAY ADMIN

22-Feb-1994 Page 10

FISCAL YEAR

COST ESTS

PE 1987 ROW 1997 CONST

UNDERWAY

$

0

AFTER 97

PE 1986 UNDERWAY

ROW NONE

$

0

CONST 1996

$ 10879

FED SHARE $ 8703

GA. SHARE $ 2176

0TH SHARE $

PE 1992

UNDERWAY

ROW 1994

UNDERWAY

CONST 1996

$ 1006

FED SHARE $

805

GA. SHARE $

201

0TH SHARE $

PE 1994

UNDERWAY

ROW 1995 $

3

CONST 1996

$

547

FED SHARE $

438

GA. SHARE $

109

0TH SHARE $

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$

310

FED SHARE $

248

GA. SHARE $

62

0TH SHARE $

PE 1995 $

6

ROW_NONE

$

0

1996

$

92

FED SHARE. $

74

GA. SHARE $

1

0TH SHARE $'_ 19

,.

C!!l!=:i

~

~

~

~

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 11

PROJ:ECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

----------------. --------------------------------------------------.-----------------------------------. ------------------------------

DECATUR SR 309@ BIG SLOUGH CREEK EAST OF SR

PE 1992

UNDERWAY

431050 REPLACEMENT OF THE EXISTING BRIDGES(S).

CONG DIST. 2

ROW 1994

$

5

PROJECT MILEAGE : .00

CONST 1995

$

409

MANAGER: J. LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

327

STATUS: DECATUR COUNTY SIGNED FOR UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

82

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DOUGHERT SR 91/ PHILEMA RD IN ALBANY@ MUCKAFOONEE CREEK

421270 REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.

PROJECT MILEAGE : .26

MANAGER: D. CHURCH

,

STATUS: SIGNED BY ALBANY 3/24/87 FOR UTILITIES/\

ALBANY TIP i B-2
CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 421420 IS AN ASSOCIATED PROJECT.

DOUGHERT 421420
STATUS:

@ MUCiliOONEE CK LANES.\

ALBANY TIP i H/R-9
CONG_DIST. 8
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 421270 IS AN ASSOCIATED PROJECT.

DOUGHERT SR 520/US 82/0GLETHO:;;;;:gf~ FM US 19 TO LOFTUS s,t/jjjfuy

421580 RECONSTRUCTION & WIDENING/FROM 4 LANES TO 6 LANES;/ : }:/

PROJECT MILEAGE_: .50

u;'itHz~~- STATUS: ~~;~R~I~NEgH~~~~89 FOR

(S,ALE$!:i:i:!Ji!i6JEt'l'}

ALBANY TIP i HR/11
CONG DIST. 8 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

DOUGHERT SR 3/US 19 AT PROCTOR & GAMBLE IN 422330 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .38 - EXIST. LANES: 0 MANAGER: J. LINDSEY STATUS: CONTACT TRAFFIC OPERATIONS

::ft:LBANY TIP i H/R-2 :':\\?~ONG DIST. 2
-.. FUND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

DOUGHERT SR 234/GILLIONVILLE RD FM EIGHT ML RD TO L~:!!~STATION 450490 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.17
MANAGER: UNKNOWN STATUS: SEND LGPA WHEN ADDED TO CWP

>~ONG Drsl\ !~
FUND ''18\:ffidf: SURFACE i TRJU.is;bRT
FED!!:lli HiGHWAY ADMIN FUNDS

22-Feb-1994 Page 12

FISCAL YEAR

COST ESTS

PE 1986

UNDERWAY

ROW NONE

$

0

CONST 1996

$ 1555

FED SHARE $ 1244

GA. SHARE $

311

0TH SHARE $

PE 1992

UNDERWAY

ROW LOCL

CONST 1996

$ 2408

FED SHARE$ 1926

GA. SHARE$

482

0TH SHARE$

PE 1993 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995

$

946

FED SHARE $

757

GA. SHARE $

189

0TH SHARE $

PE NONE

$

0

ROW NONE $

0

CONST 1995 $

30

FED SHARE$

30

GA. SHARE$

0TH SHARE$

PE ROW LOCL CONST

$. 173 AFTER 97

DOUGHERT SR 234/GILLIONVILLE RD FM LOCKETT STATION RD TO BEATTIE RD 450495 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : .62 MANAGER: UNKNOWN STATUS: SEND LGPA WHEN ADDED TO CWP
DOUGHERT D'TOWN ENHANCEMENT OF ALBANY/TRAILS,LANDSCAPING,RAIL TERMINA 470910 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: T. LONG STATUS: TO BE DONE BY CONTRACT.

t ::toNG

FUND SOURCt: :sbRFACE

FEDE..-.R...A-L--:.:H-:--i-.c..i.i.i...#. .AY

~~!/: ALB~::

TSM-5

CONG DIST. 'ig

FUND souRcE = TRANS z,tHi.iiANcE. FEDERAL HIGHWAY ADMINFUNDS

PE ROW LOCL .. CONST

$

62

AFTER 97

PE 1996 $

ROW 1996

$

CONST 1996 $

FED SHARE $

GA. SHARE $

0TH SHARE $

50 200 1844 1475
50 419

~

~

~

~

'

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 13

FISCAL YEAR

COST ESTS

DOUGHERT WHEELCHAIR LIFTS FOR PARATRANSIT 4Dl013 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

CONG DIST. 2 & 8

CAPITAL 1995

$

5

FUND SOURCE: URBAN TRANSIT DISC,

FED SHARE$

5

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

DOUGHERT WHEELCHAIR LIFTS FOR TRANSIT
4D1015 TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: ALBANY MANAGER: STEVE KISH
STATUS: LGPA NOT APPLICABLE

CONG DIST. 2 & 8

CAPITAL 1996

$

50

FUND _SOURCE: URBAN TRANSIT DISC.

FED SHARE $

45

FEDERAL TRANSIT ADMIN FUNqS

GA. SHARE$

3

0TH SHARE$

3

DOUGHERT VEHCLES, SHELTERS,
4D4011 TRANSIT PROJECTS/ FUNDS RECIPIENT: ALBANY MANAGER: STEVE KISH
STATUS: LGPA NOT APPLICABLE

CONG DIST. 2 & 8

CAPITAL 1995

$ 101

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

81

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

10

0TH SHARE $

10

DOUGHERT FACILITY IMP., CAP. MAINT., SHELTERS, FURNITURE, 4D4012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

DIST. 2 & 8

CAPITAL 1996

$

SOURCE: URBAN TRANSIT DISC.

FED SHARE $

TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

1527
1222 152 153

DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF 4D4017 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE
DOUGHERT PUBLIC TRANSIT SERVICE FOR THE CITY OF ALBANY 4D4018 TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: ALBANY PUBLIC TRANSIT SYSTEM MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

DIST. 2 tC:ii jjll! }
SOURcf:;::81;: TRANSIT FEDERAL.TRANSIT ADMIN

717 359 359
1996 $ 737 FED SHARE$ 369 GA. SHARE$ 0TH SHARE$ 369

DOUGHERT ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 4Vl011 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN DOUGHERTY MPO AREA MANAGER: STEVE KISH STATUS:

CONG DIST.
FUND SOURCE: FEDERAL TRANSIT

CAPITAL 1995

$

21

FUND FED SHARE$

17

GA, SHARE$

2

0TH SHARE$

2

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 14

FISCAL YEAR

COST ESTS

DOUGHERT ELDERLY AND DISABLED VEHICLES AND 4Vl012 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN MANAGER: STEVE KISH STATUS:

CONG DIST. 8 & 2

CAPITAL 1996

$

22

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

18

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

2

0TH SHARE$

2

,,

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

EARLY 421640
STATUS:

US 27@ WAMBLE CREEK SOUTH OF BLAKELY.
REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: J. GARLAND (M) EARLY COUNTY SIGNED FOR UTILITIES

CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 422210 IS AN ASSOCIATED PROJECT.

EARLY 422090
STATUS:

SR 62/BLAKELY FM WEST OF SR RECONSTRUCTION & WIDENING PROJECT MILEAGE : 1.70 MANAGER: J. LINDSEY (M) BLAKELY SGM 12-1-92 -

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 15

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW NONE $

0

CONST 1997

$

230

FED SHARE $

184

GA. SHARE $

46

0TH SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY

$

10

AFTER 97

EARLY 431320
STATUS:

SR 1 OVER BLUE CREEK
REPLACEMENT OF THE PROJECT MILEAGE : .00 MANAGER: J. GARLAND SEND LGPA IN 1995

EARLY 471110
STATUS:

COHEELEE CREEK COVERED BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER: UNKNOWN DOT WILL PROVIDE THE 20% MATCH

CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
SOURCE: TRANS. ENHANCE. HIGHWAY ADMIN FUNDS

PE 1994. UNDERWAY

ROW 1996

$

1

CONST 1996

$

369

FED SHARE $ 295

GA. SHARE $

74

0TH SHARE $

PE NONE $

0

ROW NONE $

0

CONST 1995 $

49

FED SHARE$

39

GA. SHARE$

10

0TH SHARE$

r

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 16

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

-P-.-I.-N-O--.----------------P-R-O-JE-C--T-DA-T-A----------------------------------------------C-O-M-M--EN-T-S---------------------------Y-E-A-R---------E-S-T-S--

ECHOLS SR 187@ SUWANNOCHEEE CRK /ALSO CLINCH -~r,n~r~v

PE 1992

UNDERWAY

431060 REPLACEMENT OF THE EXISTING BRIDGES(S).

CONG DIST. 8

ROW 1995

$

1

PROJECT MILEAGE : .00

CONST 1996

$ 1366

MANAGER: J, LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $ 1093

STATUS: ECHOLS SGN 4-6-92 FOR UTILITIES;

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

273

0TH SHARE $

' ~

~

~

~

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 17

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

---------------------------------------------------------------------------------------------------.-------------------.-------------

GRADY SR 112 SB MP 2.3 TO 3.3; NB

PE 1992 UNDERWAY

421940 ADDITION OF A PASSING LANE.

CONG DIST. 2

ROW 1993 UNDERWAY

PROJECT MILEAGE : 2.00

CONST 1995

$

697

MANAGER: J. LINDSEY STATUS: GRADY COUNTY SIGNED 10/26/90

rt'fl]f]ihi""

FUND souRcE: suRFAcE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE $

558

GA. SHARE $

139

0TH SHARE $

GRADY 422180
STATUS:

SR 111@ SOFKEE CRK N/CR 81
REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: J. LINDSEY GRADY SIGNED 2-18-92

_.,,,,,,,,,,,,,,;,,,;,,

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1995 $

1

CONST 1996

$

531

FED SHARE $

425

GA. SHARE $

106

0TH SHARE $

GRADY 431330
STATUS:

SR 111 OVER TURKEY REPLACEMENT OF THE PROJECT MILEAGE : .00 MANAGER: J. LINDSEY GRADY COUNTY SIGNED FOR

iLl,i~.~-

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1995 $

1

CONST 1996

$

391

FED SHARE $

313

GA. SHARE $

78

0TH SHARE $

GRADY 442550
STATUS:

SR 188 OVER WEST BRANCH BARNETTS CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: J. LINDSEY
SEND LGPA IN 1995

.,,)}})()(}
<\}@/!]]/{/

DIST. 2
SOURCE: BRIDGE PROGRAM HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW 1996 $

1

CONST 1997

$

321

FED SHARE $

257

GA. SHARE $

64

0TH .SHARE $

GRADY 442552
STATUS:

SR 188 OVER BARNETTS CREEK/THOMAS REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: J. LINDSEY SEND LGPA IN 1995

PE 1994

UNDERWAY

ROW 1996 $

1

CONST 1997

$

496

FED SHARE $

397

GA. SHARE $

99

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPf<.Y.fEMENTS PROGRAM
PROJ2.CT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

IRWIN 421960
STATUS:

SR 11/US 129@ REEDY CRK & STUMP CRK. REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .00 MANAGER: J, LINDSEY SGN BY COUNTY 5-16-91 AND OCILLA

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

IRWIN 471070
STATUS:

CR 181/SATILLA CHURCH RD. @ REPLACEMENT OF THE EXISTING~~~~,~~'~ PROJECT MILEAGE : .22 MANAGER: J, LINDSEY
SEND LGPA 10/94

CONG DIST, 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 18

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1995

$

10

CONST 1995

$

716

FED SHARE $

573

GA. SHARE $

143

0TH SHARE $

PE 1995

$

8

ROW LOCL

CONST 1996

$

437

FED SHARE$ 350

GA. SHARE$

87

0TH SHARE$

IIZlm5!:II

IIIDC3

~

~ ,,

1:1.'lmm

~

F . . . ..,..

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 19

FISCAL YEAR

COST ESTS

LOWNDES 42172X
STATUS:

SR 133 FM W/CR 276 TOE. OF WITHLACOOCHEE/ SEE BROOKS RECONSTRUCTION & WIDENING. NO LANE ADDI1ION PROPOSED. .PROJECT MILEAGE : . 00
MANAGER: K FULBRIGHT

CONG DIST. 2
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 421720 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1995

$

0

CONST 1996

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

LOWNDES 422280
STATUS:

i&Rif SR 125 FM CR 188 TO MOODY AFB Noi~il:

IN

RECONSTRUCTION & WIDENING FROM'4 LANES TO 5 LANES,?

f ~;it:t~g~;~~r~~:]7bITi:~~~: i;~2 PUB UTL (EXCEl~ :#ATER)

~~~~~$
STATUS:

;~~i!]i i :c~,~;Ri~T~~Ns~

1
I~ov~~s~DITION PROP61i6W

PROJECT MILEAGE : .00

MANAGER: J. LINDSEY

.

REQ VALDOSTA DO ROW & UTILITfES}~_,J.8-94

CONG DIST. 8 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

LOWNDES 431340
STATUS:

.7j;:~! ONE-WAY PAIR ASHLEY & PATTERSON FM N' SIDE DR TO SR

ff::/: ,: "'

MINOR WIDEN & RESURF / RECST. OR REHAB.

. ,

\ jdONG DIST. 8

PROJECT MILEAGE : .49 - EXIST. LANES: 2 /PROPOSEO:=LJWES: 4

MANAGER: J. LINDSEY

FUND SOURCE: SURFACE TRANSPORT.

VALDOSTA SGN 5-20-93 FOR ROW & UTILITIEs.''9.9yJ1ff/;i:)&iA N/A

FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW 1995

$

500

CONST 1996 $ 8500

FED SHARE $ 6800

GA. SHARE $ 1700

0TH SHARE $

PE NONE $

0

ROW LOCL

CONST 1996

$

116

FED SHARE $

116

GA. SHARE $

0TH SHARE $

PE NONE $

0

ROW 1995 $

1

CONST 1996 $ 200

FED SHARE $

HO

GA. SHARE. $

40

0TH SHARE $

LOWNDES 442560
STATUS:

OLD CLATTVILLE RD/CR 785 FM E/I-75 TON OF IND;i\rRIAL BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.80 MANAGER: RAY METTS (M) SEND LGPA IN 1997

::::::

t>cQNG Dist1.#

Fm,;;: ib&kff: SURFACE T~;J8ki Y> .

FEDERA,L HIGHWAY ADMitr'E'oNDs
442565/:i:s AN ASSOCIA'.rl,fi:i\PROJECT.

:t r

PE 1996 ROW LOCL CONST

$

80

AF.TER 97

LOWNDES 442565
STATUS:

OLD CLATTVILLE RD/CR 785 OVER MUD CREEK IN VALDOSTA REPLACEMENT OF THE EXISTING BRIDGES($). FROM 2 TO 4 LANES. PROJECT MILEAGE : 00 MANAGER: RAY METTS (M) SEND LGPA IN 1997

PE 1996_ ROW LOCL

$

10

AFTER 97

LOWNDES 450430
STATUS:

SR 7/US 41 AT JAMES BECK OVERPASS IN VALDOSTA INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: J. LINDSEY VALDOSTA SGN 5-20-93 FOR UTILITIES; COUNTY LGPA - N/A

FUND SOURCE: HWY FEDERAL HIGHWAY

PE NONE

$

0

ROW 1995 $

6

CONST 1996 $

50

FED SHARE$

45

GA. SHARE$

5

0TH SHARE$

COUNTY P,I,NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

LOWNDES 450440
STATUS:

GORDON STREET/CR 555/CR 720 FM BAYTREE RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : 2.87 MANAGER: RAY METTS (M) SEND LGPA IN 1996

ST CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 20

FISCAL YEAR

COST ESTS

PE 1996 ROW LOCL CONST

$

86

AFTER 97

LOWNDES NOAK STREET FM BAYTREE ROAD TO

450450 !~~~~~!iL'A~~~T~32 - EXIsTfrDffikf: 2 /PROPOSED i:.Wts: 3

~~~!~l STATUS:

~GNL;~~~~!3 Rowl~~~~if~Es; cooNTY NOT APfi2ABLE

:~~~=~g/~:;;;:!lt:;..:~~: LOWNDES
471010

PATHS riJfINo

PROJECT MILEAGE : . oo - EXIST. LANES: o /PROPOSl!:b iiANts: o

MANAGER: CHRIS SIMONS

\

........... .

STATUS: LGPA TO BE DONE BY CONTRACT ....

CONG DIST. 2 FUND SOURCE:-HWY. SAFETY FEDERAL HIGHWAY ADMIN FONDS
CONG DIST, 2 FOND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW LOCL

CONST 1996

$

150

FED SHARE $

135

GA. SHARE $

15

0TH SHARE $

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

1250 1000
250

...

~

~

liml'm'l

~

~

~

,..

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT 0~ TRANSPORTATION DRAFT, STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MILLER 421715
STATUS:

SR 1/US 27@ SPRING CREEK REHAB. OF THE EXISTING BRIDGE(S). PROJECT MILEAGE : .50 MANAGER: M GANNAWAY CITY OF COLQUITT SGN 8/89 UTL;DOT

4 LANES. LEWIS.

CONG DIST. 2 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY AOMIN FUNDS 421710 IS AN ASSOCIATED PROJECT.

MILLER 470861
STATUS:

CR 183/UNION CH RD@ AYCOCKS REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: J. LINDSEY REQ MILLER CO DO

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 21

FISCAL YEAR

COST ESTS

PE 1990 ROW NONE

UNDERWAY

$

o

CONST 1995

$ 1169

FED SHARE $

935

GA. SHARE $

234

0TH SHARE $

PE 1991

UNDERWAY

ROW LOCL

CONST 1997

$

54

FED SHARE $

43

GA. SHARE $

2

0TH SHARE $

13

COUNTY P,I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MITCHELL CR 250@ BIG SLOUGH WEST OF CAMILLA 470880 REPLACEMENT OF THE EXISTING BRIDGES($):
PROJECT MILEAGE : .00 MANAGER: J. LINDSEY STATUS: MITCHELL COUNTY SIGNED ROW,

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MITCHELL RESTORE MITCHELL DRUG 471020 MISCELLANEOUS IMPROVEMENTS
PROJECT MILEAGE : .00 MANAGER: J. TOLSON STATUS: LGPA TO BE DONE BY

CONG DIST. 2 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 22

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$

340

FED SHARE $

272

GA. SHARE $

68

0TH SHARE $

PE 1996

$

ROW 1996

$

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

20 45 307 246'
14 75

..

~

~

~

~

COUNTY P. I .NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

QUITMAN 431290
STATUS:

SR 27/SR 39: OVER TOBANNEE CREEK NORTH REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: J. LINDSEY SEND LGPA IN 1996

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 23

FISCAL . YEAR

COST ESTS

PE 1995 ROW 1997 CONST

$

10

$

1

AFTER 97

QUITMAN 4B1269
STATUS:

COUNTY OPERATED PUBLIC TRANSIT
TRANSIT FACILITIES/ FUNDS RECIPIENT: QUITMAN MANAGER: STEVE KISH

QUITMAN 4B1270
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: QUITMAN MANAGER: STEVE KISH

CONG DIST. 2

OPERATING 1995

$

24

FUND SOURCE: RURAL TRANSIT

FED SHARE $

14

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

10

CONG DIST. 2

OPERATING 1996

$

25

FUND SOURCE: RURAL TRANSIT

FED SHARE $

15

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

10

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 24

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O--. ---------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M--M-E-N-TS----------------------------Y-EA-R---------E-S-T-S--

RANDOLPH CR 134/CR 134@ SOUTHERN RAILROAD 2 MI

PE 1995

$

8

471060 REPLACEMENT OF THE EXISTING BRIDGES(S).

CONG DIST. 2

ROW LOCL

PROJECT MILEAGE : .21

CONST 1997

$

346

MANAGER: J. LINDSEY

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$

277

STATUS: SEND LGPA 10/94

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

69

0TH SHARE$

~

~

c~@,t,....~.a

1

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

SEMINOLE SR 253@ FISH PONO DRAIN N OF SR 39 431080 REPLACEMENT OF THE EXISTING BRIDGES($).
PROJECT MILEAGE : .00 MANAGER: J. LINDSEY STATUS: COUNTY SIGNED 7-8-91 FOR UTILITIES.

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

SEMINOLE CR 49/GATOR PONO ROAD OVER

462470

REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .13

~~.t0 ,ft~?:'

MANAGER: J. LINDSEY (M)

STATUS: SEMINOLE SGN 9-14-92

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

f,

22'-Feb-1994 Page 25

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1995

$

1

CONST 1995 $ 500

FED SHARE $

400

GA. SHARE $ 100

0TH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1995 $ 252

FED SHARE$ 202

GA. SHARE$

50

0TH SHARE$

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TERRELL 421980
STATUS:

SR 49@ KINCHAFOONEE CREEK/ ALSO REHABILITATION OF THE EXISTING BRIDGE PROJECT MILEAGE : .00 MANAGER: J. LINDSEY TERRELL SGN 8-7-91 AND SUMTER SGN

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TERRELL 422370
STATUS:

SR 45 AT SR 520 IN DAWSON INTERSECTION IMPROVEMENT/ PROJECT MILEAGE : .20 MANAGER: J. LINDSEY REQ CITY OF DAWSON DO

CONG DIST. 2
3 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

TERRELL 442570
STATUS:

SR 55 REALIGNMENT FM RECONSTRUCTION & MT~~~T~~'
PROJECT MILEAGE : .40 MANAGER: J. LINDSEY
\ERRELL SIGNED TO DO

CONG DIST. 2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 26

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1995

$

1

CONST 1996

$ 1435

FED SHARE $ 1148

GA. SHARE $ 287

0TH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1996 $

17

FED SHARE$

17

GA. SHARE$

0TH SHARE$

PE NONE

$

0

ROW 1996 $

8

CONST 1997

$

125

FED SHARE$

100

GA. SHARE$

25

0TH SHARE$

,,

,,

't

Bml!%!ll

im::::m

~

~

~

~

~

~

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

THOMAS SR 122 WB MP 4.4 TO 5.4; EB MP 7.3 TO 8,3

421830 ADDITION OF A PASSING LANE.

.~ai~ STATUS:

~:r:;i;~~~t::ITIES; THOMASVIL~~ :~~11::j/92 PUB UTIL.

tiII:: ~.!~~~:~ ~~S ~:~t! THOMAS
421970

TiiE c:~1:,:1

ADDE~,~S.

~ai~~:r:t!!g~~f STATUS:

0:-127~i.~:::#.8tsVILLE SGN 2-12-9~ ~;IL.

CONG DIST. 2 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 2 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

!~~~~
STATUS:

tl~~t ::P~ic:Mi;;cg~AT~~:~:~4~t.B~;ig~ES (s) . NO ADDED
PROJECT MILEAGE : .00 MANAGER: J. LINDSEY
THOMAS COUNTY SIGNED FOR

CONG DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

THOMAS 442500
STATUS:

METCALFE ROAD/CR 384 OVER PINE CREEK REHABILITATION OF THE EXISTING BRIDGE(S). PROJECT MILEAGE : .23 MANAGER: J. LINDSEY (M) SEND LGPA IN 1995

DIST. 2
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

THOMAS 450460
STATUS:

cs 245/PINE TREE BLVD@ OLIVE CK/THOMASVILLE REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .20
~!~:Rlo~26~~~D!E~ITY SGN 11-9-93 FOR ROW, UTIL & DETotik.f

THOMAS 470693
STATUS:

CR 36/POPE,ROAD OVER PISCOLA CREEK
REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE. : .10 MANAGER: J. LINDSEY THOMAS SGN FOR ROW, UTILITIES & DETOURS 7-1-92.

it CONG DisfJ

iav!8f F~:~::

BRIDGE PROG~J?

FEpEifilili\JiIGHWAY ADMIN toNDS

i,,~~G :::T. 201f!1irl!I

FUND SOURdih ii{foGE PROGRAM FEDERAL Jifoa#A.y ADMIN

22-Feb-1994 Page 27

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$

600

FED SHARE $

480

GA. SHARE $

120

0TH SHARE $

PE 1992

UNDERWAY

ROW 1995

$

1

CONST 1996

$ 2124

FED SHARE $ 1699

GA. SHARE $

425

0TH SHARE $

PE 1992

UNDERWAY

ROW 1995

$

1

CONST 1996

$

751

FED SHARE $

601

GA. SHARE $

150

0TH SHARE $

PE 1994

UNDERWAY

ROW LOCL

CONST 1997

$

329

FED SHARE $ 263

GA. SHARE $

66

0TH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1996

$

388

FED SHARE $

311

GA. SHARE $

78

0TH SHARE $

PE 1993 UNDERWAY

ROW LOCL

1995

$

160

FED SHARE $

128

GA. SHARE $

32

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TIFT 410580
STATUS:

I-75 AT 2ND STREET AND 8TH STREET/TIFT0?-1

LANDSCAPING / ENHANCEMENT

''' .

PROJECT MILEAGE : oo - EXIST. LANES: o lJ~oPosED LANES: o

~F =A~i~~ ii~~~o~AY 50% OF coNsTRQcf8Jj!osT 2-9-94

CONG DIST. 8
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

TIFT 422170
STATUS:

SR 125/TIFTON FM 20TH ST TO 40TH:

i%.f:&s: TURN LANES / SAFETY

......

\ \

PROJECT MILEAGE : 1. 05 - EXISf:?'

0 /PROPOSED 'LANES: 0

MANAGER: J. LINDSEY

< ' ):

REQ TIFTON DO UTILITIES 1Q42o#92; COUNTY N/A 11-13-~2(

TIFT 471040
STATUS:

1
if*i RESTORE MONTEZUMA D;;J

GEORGIA AGRIRAMA

' )'

1

1

1 1: : ~!;~~i~i~~iGiM~R~~M~Nti!,T~N~i!~E~T/PROPOSEO

0

MANAGER: J. TOLSON

LGPA TO BE DONE BY CONTRACT

CONG DIST. 8 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

TIFT 4B1274
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: TIFT MANAGER: STEVE KISH

DIST. 8

TRANSIT ADMIN FUNDS

TIFT

COUNTY OPERATED PUBLIC TRANSIT SERVICE

4B1275 . TRANSIT FACILITIES/ OPERATIONS

FUNDS RECIPIENT: TIFT

MANAGER: STEVE KISH.

STATUS:

22-Feb-1994 Page 28

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

80

FED SHARE $

64

GA. SHARE $

24

0TH SHARE $

40

PE 1992

UNDERWAY

ROW 1995

$

230

. CONST 1996

$

567

FED SHARE $

510

GA. SHARE $

57

0TH SHARE $

PE LOCL

ROW NONE

$

0

CONST 1995

$

110

FED SHARE $

88

GA. SHARE $

0TH SHARE $

22

OPERATING 1995

$

53

FED, SHARE$

.31

GA. SHARE$

0TH SHARE$

22

1996

$

55

FED SHARE$

32

GA. SHARE$

0TH SHARE$

23

,,



mmm c::m=

~

==i

~

.. :-.::

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TURNER 410245
STATUS:

I-75 FM THE TIFT COUNTY LINE TO SR 159 RECONSTRUCTION & WIDENING FROM 4 LANES PROJECT-MILEAGE : 11.07 MANAGER: B FERGUSON (M) TURNER SGN 4-20-92 UTILITIES; ASHBURN

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

TURNER 410250
STATUS:

I-75 FM SR 159 NEAR ASHBURN RECONSTRUCTION & WIDENING PROJECT MILEAGE : 16.50
MANAGER: B FERGUSON (M) REQ TURNER AND CRISP DO

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN .FUNDS

TURNER 410590
STATUS:

I-75 REST AREAS REST AREA/ RECST. OR PROJECT MILEAGE : .00 MANAGER: J. GARLAND NOT APPLICABLE

CONG DIST. 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

TURNER 431300
STATUS:

SR 032 OVER LITTLE SAND CREEK REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .00 MANAGER: J. LINDSEY SEND LGPA IN 1996

DIST. 8
SOURCE: BRIDGE PROGRAM HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 29

FISCAL YEAR

COST ESTS

PE 1995 ROW CONST

$

245

AFTER 97

AFTER 97

PE 1987 ROW 1997 CONST

UNDERWAY $ 13000 AFTER 97

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1995 - $ 1600

FED SHARE $ 1440

GA. SHARE $

160

0TH SHARE $

PE 1995 ROW 1997 CONST

$

10

$

1

AFTER 97

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

G~UHGlA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WARE 422125
STATUS:

SR 38/US 84@ SUWANNEE CRK REHAB. OF THE EXISTING BRIDGE(S). PROJECT MILEAGE : .00 MANAGER: GENE POWELL (M)
SEND LGPA IN 1996

CONG DIST. 1 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 30

FISCAL YEAR

COST ESTS

PE 1995 ROW NONE CONST

$

4

$

0

AFTER 97

'

~

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WILCOX 421962
STATUS:

SR 11/US 129 ~ FOLSOM CRK;CEDAR CRK; REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: J. LINDSEY WILCOX COUNTY SIGNED FOR UTILITIES

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

WILCOX 422080
STATUS:

SR 30 EB FM.MP 14.5-16.0;WB
ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.70 MANAGER: J. LINDSEY WILCOX SIGNED 8-26-91

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

WILCOX 422310
STATUS:

SR 30/US 280: REPLACEMENT OF THE PROJECT MILEAGE : .00 MANAGER: J. LINDSEY SEND LGPA IN 1996

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 31

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1995

$

3

CONST 1996

$ 1274

FED SHARE $ 1019

GA. SHARE $

255

0TH SHARE $

PE NONE

$

0

ROW 1993

UNDERWAY

CONST 1995

$

844

FED SHARE $

675

GA. SHARE $

169

0TH SHARE $

PE 1995 ROW 1997 CONST

$

10

$

1

AFTER 97

WILCOX 4Bl279
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WILCOX MANAGER: STEVE KISH

WILCOX 4Bl280
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WILCOX MANAGER: STEVE KISH

WILCOX 4C2279
STATUS:

ONE CONVERSION VAN WITH LIFT AND ONE MOBILE RADIO TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WILCOX MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 8

OPERATING 1995 $

40

SOURCE: RURAL TRANSIT

FED SHARE$

24

I/7/!.fDDt:'.,:_..:TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

16

42 25
17

souRcffr~!~
FEDEJ:lAI,. d@wlfT

1995

$

33

FED SHARE$

26

GA. SHARE$

4

0TH SHARE$

3

COUNTY P;I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WORTH 470890
STATUS:

CR 164/ELM STREET OVER WARRIOR CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: J. LINDSEY WORTH SGN 5/92 PUB UTIL;POULAN SGN

CONG DIST. 8
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 32

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 251

FED SHARE$ 201

GA. SHARE$

50

0TH SHARE$

,,

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BACON 520910
STATUS:

SR 32/ALMA@ HURRICANE CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : . 65 MANAGER: PETE BLOCKER
BACON SIGNED UTILITIES 6-17-91

2 TO 4 LANES,

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 522125 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 1

FISCAL YEAR

COST ESTS

PE 1983

UNDERWAY

ROW NONE

$

0

CONST 1996

$ 1661

FED SHARE $ 1329

GA. SHARE $

332

0TH SHARE $

BACON 522120
STATUS:

SR 32, EB MP 13.4-14.6; ADDITION OF A PASSING LANE. PROJECT MILEAGE : 1.20 MANAGER: PETE BLOCKER
BACON SGN FOR

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1995

$

12

CONST 1996

$

450

FED SHARE $

360

GA. SHARE $

90

0TH SHARE $

BACON 522125
STATUS:

SR 32/ALMA FROM SR. RECONSTRUCTION & PROJECT MILEAGE : 3.10 MANAGER: PETE BLOCKER CITY OF ALMA SGN 5/21/90,

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 520910 IS AN ASSOCIATED PROJECT.

PE 1992

UNDERWAY

ROW 1993 UNDERWAY

CONST 1996

$ 1997

FED SHARE $ 1598

GA. SHARE $

399

0TH SHARE $

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY.1997
coMMENTS

BRANTLEY CR 11@ MILL CREEK WEST OF HOBOKEN 570925 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE: .20 MANAGER: STATUS: BRANTLEY SGN DO ROW, UTILITIES &

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS

22-Feb-1994 Page 2

FISCAL YEAR

COST ESTS

PE 1994 UNDERWAY

ROW LOCL

CONST 1996 $ 144

FED SHARE$ 115

GA; SHARE$

29

0TH SHARE$

t ~,
:
,,

l!&'!m

im=::,

l!l!l!!ffl!!I

l!!'l'!!!"!I

~

~

~

~

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BRYAN 511190
STATUS:

I-16 WIDEN 10 BRIDGES@ MP 138.3; 145.9b 146.6; 146.8; 147.2 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: GENE POWELL (M) _ REQ BRYAN DO UTILITIES 10-5-93

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

~~i!;:r:~~~t~~~: BRYAN
521750 STATUS:

:c~~~;:g~~~~~ :r~iD~~r!~ ~!6Mi~~1,~!g~~c:E~~~f OFLW BR
0
UTILf&iH'i 100% PRIVATE UTIL !]iijk4-93

BRYAN 521755
STATUS:

:~!~:i11 WIDEN & NEW ~RIDGE

dkKL @ OGEECHEE RIVER/ALSO

co

BRIDGES / NEW CONSTRUCTIQlt

PROJECT MILEAGE : .36

MANAGER: M. REYNOLDS

BRYAN COUNTY SIGNED FOR

CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521750 rs AN ASSOCIATED PROJECT.

22-Feb-1994 Page 3

FISCAL YEAR

COST ESTS

PE 1994

UNDERWAY

ROW NONE

$

0

coNST 1997 $ 2502

FED SHARE $ 2252

GA. SHARE $

250

0TH SHARE $

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995 $ 3732

FED SHARE $ 2986

GA. SHARE $

746

0TH SHARE $

PE 1991 UNDERWAY

ROW NONE $

0

CONST 1995 $ 2388

FED SHARE $ 1910

GA. SHARE $

478

0TH SHARE $

BRYAN 532370
STATUS:

SR 144 EB FM S OF CR 244/ML 14 TON ADDITION -OF A PASSING LANE. PROJECT MILEAGE : 1.50 MANAGER: PETE BLOCKER SEND LGPA WHEN PROJECT rs ADDED TO CWP

DIST. l
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE ROW CONST

$

15

AFTER 97

AFTER 97

BRYAN 532410
STATUS:

CR 90/BELFAST-KELLER RD OVER TIVOLI RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE: .20 MANAGER: PETE BLOCKER BRYAN SGN DO ROW, UTILITIES AND DETOURS 7-24-92

BRYAN 5Bl284
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH

BRYAN 5Bl285
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSiT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH

BRIDiIBGME rNPR,ftOrnGos~:)

PE 1994 UNDERWAY

ROW LOCL

CONST 1995

$

341

FED SHARE$

273

GA. SHARE$

68

0TH SHARE$

FUND souRciff\i6fu TRANSIT

+O~ERATING 1995 $ FED SHARE$

91 53

FECiEJ.YU, ,tfuilisfr ADMIN FUNDS.

GA. SHARE$

0TH SHARE$

38

CONG DIST. \1

OPERATING 1996 $

95

FUND SOURCE: RURAff~~IT
FEDERAL TRANSIT MMJN FUNDS

FED SHARE$

55

GA. SHARE$

0TH SHARE$

40

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

BRYAN 5C2284
STATUS:

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BRYAN MANAGER: STEVE KISH LGPA NOT APPLICABLE

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS. PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 4

FISCAL YEAR

COST ESTS

CAPITAL 1995

$

32

FED SHARE$

26

GA. SHARE$

3

0TH SHARE$

3

;,

lll!ll!Z!ll

~

~

~

eml:!3

~

1..............,;

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BULLOCH 521170
STATUS:

SR 7 3 W @ LOWER LOTTS CRK 6 MI S.OUTH OF/:STATESBORO

BRIDGE REMOVAL / REPLACEMENT

,::-:.

PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2

MANAGER: PETE BLOCKER

. .....

BULLOCH COUNTY SIGNED 1-7-92 FOR UTILtii'j:\.

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 5

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

R,OW 1995

$

1

CONST 1995

$

96

FED SHARE $

77

GA. SHARE $

19

0TH SHARE $

BULLOCH 521270
STATUS:

SR 67 FM CR 248/585 NORTH

RECONSTRUCTION & WIDENING

5

PROJECT MILEAGE : 1.40

c:qfill4~ ~~~::~R;E;~NB~~~~!~ &

~'bN 6-5-91 FOR UTILI'.i){Jl:$

BULLOCH 521275
STATUS:

SR 67 @ LITTLE LOTTS '&Md}(

REPLACEMENT oF THE ExisTb~G BRIDGES cs) No ADDEt>,

PROJECT MILEAGE : .20

MANAGER: PETt BLOCKER

...

BULLOCH COUNTY SIGNED 6/14/!:}Q

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 521275 IS AN ASSOCIATED PROJECT.
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521270 IS AN ASSOCIATED PROJECT.

PE 1992 ROW 1995 CONST

UNDERWAY

$

80

AFTER 97

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1997

$

641

FED SHARE $

513

GA. SHARE $

128

0TH SHARE $

BULLOCH 522230
STATUS:

OLD SR 46@ BLACK CREEK 1.2 MI W/SR 26 REPLACEMENT OF THE EXISTING BRIDGES (S) . PROJECT MILEAGE :. . 00 MANAGER: PETE BLOCKER BULLOCH COUNTY SGN FOR ROW & UTILITIES

DIST. 1
SOURCE: BRIDGE PROGRAM HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995 $ 859

FED SHARE$

687

GA. SHARE$

172

0TH SHARE$

BULLOCH 522460
STATUS:

SR 67 FM I-16 TO STATESBORO BYP RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 10. 70 .
MANAGER: RAY METTS (CM) SEND LGPA WHEN PROJECT IS ADDED TO CWP

:=t~ONG Drsf;:jijj[
FUN' )@~fii: sURF:icE 'l'NWJf6k4:
FEDERAL JtIGHWAY ADMIN 'lrtlNbS 522:agfts AN AssocfATED

PE ROW CONST

$

371

AFTER 97.

AFTER 97

BULLOCH 522470
STATUS:

SR 26/US 80 EB MP 7.1-8.2;, WB MP 8.1-9.3 ADDITION OF A PASSING LANE. PROJECT MILEAGE: 2.30 MANAGER: PETE BLOCKER BULLOCH SGN/UTILITIES 12-l 7-9l;PORTAL' SGN 12-5-91 PUB UTILS

::1I1:1~i~G DIST. 1.

R~: i~~~

. ;a;; ---.. --..

:":. .... ..

- ...-::::::::\CONST

SOURCt,f Jbi&AcE TRANSP;;;;:

FEDE-:R-:-:,.A:,:-.-L:-::-:.;-:1,..i.!G:-:.:k.;-.W-:.:- AY ADMIN

UNDERWAY

$

93

AFTER 97

BULLOCH 522740
STATUS:

SR 26 AT ZETTERTOWER/STOCKYARD

TURN LANES/ SAFETY

PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0

MANAGER: BURT RIDDLE

BULLOCH SIGNED 12-10-93 ROW AND UTILITIES

OTO

CONG DIST. \1
FUND SOURCE: NAT~ii1d~!~y
FEDERAL HIGHWAY AfiMIN FUNDS

PE 1994

UNDERWAY

ROW LOCL

CONST 1996

$

156

FED SHARE$

156

GA. SHARE$

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 6

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P. I. NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-----------------------------------------------------------------------------------------------------------------------------------

BULLOCH OLD SR 46@ LITTLE LOTTS CK 11 MI

PE 1993

UNDERWAY

531270 REPLACEMENT OF THE EXISTING BRIDGES(S).

CONG DIST. 1

ROW LOCL

PROJECT MILEAGE : .00

CONST 1995

$- 575

MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

460

STATUS: REQ BULLOCH DO ROW AND UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

115

0TH SHARE $

BULLOCH 541950
STATUS;

SR 46 OVER LUKE SWAMP BRANCH REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: SEND LGPA IN 1995

CONG DIST. l
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW 1996

$

1

CONST 1997

$

320

FED SHARE $

256

GA. SHARE $

64

0TH SHARE $

BULLOCH 550500
STATUS:

BRANNEN ST/GENTILLY RECONSTRUCTibN & PROJECT MILEAGE : 1.47 MANAGER: PETE BLOCKER STATESBORO SGN 4-1-91 ROW

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT, FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW LOCL

CONST 1997

$

847

FED SHARE $

678

GA. SHARE $

169

0TH SHARE $

BULLOCH 571010
STATUS:

STATESBORO GREENWAYS; LANDSCAPING. BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: KEITH GOLDEN LGPA TO BE DONE BY CONTRACT

DIST. 1
SOURCE: TRANS: ENHANCE. HIGHWAY ADMIN FUNDS

PE LOCL

ROW 1995

$

200

CONST 1995

$

175

FED SHARE $

140

GA. SHARE $

40

0TH SHARE $

75

BULLOCH 5Bl519
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPitNT: BULLOCH COUNTY MANAGER: STEVE KISH NOT APPLICABLE

:iB&Mft: FFUENDDERAidrRANsRITURiAiLliijTI~RAtoN'Nsio4s?

'::: ..OPERATING 1995

$

FED SHARE$

GA. SHARE$

44 26

0TH SHARE$

18

BULLOCH 5Bl520
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH NOT APPLICAB:tE

:JH:ipNG DIST.

;~b :?<:::::::::::::::OPERATING 19 9 6

$

SOURctt::iahL TRANSIT

FED SHARE$

46 27

FEDE;AAI,. ,J.'~$lT ADMIN

GA. SHARE$

0TH SHARE. $

19

BULLOCH 5C251~
STATUS:

TWO CONVERSION VANS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: BULLOCH COUNTY MANAGER: STEVE KISH NOT APPLICABLE .

CONG DIST >'=1 FUND SOURCE: RuRAflMNsIT
FEDERAL TRANSIT ADMfif FUNDS

CAPITAL 1995

$

58

FED SHARE$

46

GA. SHARE$

6

0TH SHARE $-

6

.

llmllm

~

111!!!!!:!!m

~

~

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CAMDEN 511070
STATUS:

I-95 FM FLA LINE TO HARRIETTS BLUFF RECONSTRUCTION & WIDENING FROM 4 LANES PROJECT MILEAGE : 7.22 MANAGER: J. GRAYBEAL DOT PAY CAMDEN UTIL 1-19-94;

RVR CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y070 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 7

FISCAL YEAR.

COST ESTS

PE 1993

UNDERWAY

ROW NONE

$

0

CONST 1996

$ 21500

FED SHARE $ 17200

GA. SHARE $ 4300

0TH SHARE $

CAMDEN 511075
STATUS:

I-95@ ST MARY'S RIVER@ FLA BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .51 MANAGER: J. GRAYBEAL CAMDEN SGN UTIL 2/92;

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y075 IS AN ASSOCIATED PROJECT.

PE 1993

UNDERWAY

ROW NONE

$

0

CONST 1996

$ 6602

FED SHARE $ 5282

GA. SHARE $ 1981

0TH SHARE $ 3301

CAMDEN 511080
STATUS:

I-95 FM HARRIETT'S RECONSTRUCTION & PROJECT MILEAGE : 6.72 MANAGER: J. GRAYBEAL CAMDEN COUNTY SGN 2-4-92

SR 25 SPUR 4 LANES TO

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y080 IS AN ASSOCIATED PROJECT.

PE 1993

UNDERWAY

ROW NONE

$

0

CONST 1996

$ 17098

FED SHARE $ 13678

GA. SHARE $ 3420

0TH SHARE $

CAMDEN 511082
STATUS:

I-95 FM SR 25 SPUR TO CR 138/INCL BRIDGES_ RECONSTRUCTION & WIDENING FROM 4 LANES TO PROJECT MILEAGE : 8.44 MANAGER: J. GRAYBEAL CAMDEN SGN 3-24-92 - UTILITIES

CAMDEN 511084
STATUS:

I-95 FM CR 1~8 TO US 17/GLYNN & BR@ L
RECONSTRUCTION & WIDENING FROM 4 LANES
PROJECT MILEAGE : -6. 76
MANAGER: J. GRAY.BEAL REQ GLYNN DO UTIL 3-2-92; CAMDEN SGN 3-24-92 UTIL.

CAMDEN 51Y070
STATUS:

I-95 FM FLA LINE TO HARRIETTS BLUFF RD/INCL BR@ CROOKED RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES. PROJECT MILEAGE : 7.22 MANAGER: UNKNOWN DOT PAY CAMDEN UTIL 1-19-94; KINGSLAND REFUSED 7-6-93

DIST. 1
FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS S.f.-..Y..0...82'\t-S..::.. AN ASSOCIATED PROJECT.

PE 1993

UNDERWAY

ROW NONE

$

0

CONST 1995

$ 31055

FED SHARE $ 24844

GA. SHARE $ 6211

0TH SHARE $

/~:~~S~~~~:[!~i,P i BATS93-ll

PE 1996

$

ROW NONE

$

CONST 1996

$

FUND:$9~?t: NAT'.L _HIGliffifj//

FED SHARE$

FEDERAL:JUGHWAY ADMINC::FUNDS

::::/\

Slt084)is -:::=::: .:::-

AN ASSOC!.A....T.ii.iif :pfoJECT. /

GA. SHARE$ 0TH SHARE$

231 0
21805 17444
4361

FUND souRcif:'iJt:;~TE MAINT
FEDERAL.-..iifdft#.fi.y ADMIN FUNDS/
511010: is :iuf ASSOCIATED PRddi!:cf{?:

PE 1993

UNDERWAY

ROW NONE

$

0

CONST 1995

$ 4000

FED SHARE $ 3600

GA. SHARE $

400

0TH SHARE $

CAMDEN 51Y075
STATUS:

I-95@ ST. MARY'S RV@ FLA STATE LINE; FOR IM$; SEE 511075 UNKNOWN/ UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MA!-{AGER: UNKNOWN

CONG DIST :'''\1
FUND SOURCE: I-STATE\AAINT. FEDERAL HIGHWAY AriMtNFUNDS 511075 IS AN ASS6Ct.ATED PROJECT.

PE NONE

$

ROW NONE

$

CONST 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 1640 1476
656 820

COUNTY P.I.NO.

DESCRIPTION PROJECT DATK.

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CAMDEN 51Y080
STATUS:

I-95 FM HARRIETT'S BLUFF RD TO SR 25 SPUR
RECONSTRUCTION & WIDENING FROM 4 LANES T:c. 6 LANES.
PROJECT MILEAGE : 6.72
MANAGER: UNKNOWN
CAMDEN COUNTY SGN 2-4-92 FOR

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511080 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 8

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1995

$ 3000

FED SHARE $ 2700

GA. SHARE $

300

0TH SHARE $

CAMDEN 51Y082
STATUS:

I-95 FM SR 25 SPUR TO CR 138/ING.jgfiB8k's
RECONSTRUCTION & WIDENING FR0!1_: 4= ~ES TO
PROJECT MILEAGE : 8.44
MANAGER: UNKNOWN
CAMDEN SGN 3-24-92

CAMDEN 51Y084
STATUS:

I-95 FM CR 1:38 TO US fi/q:tYNN. & BR @ L SATILLA Rvii]Jhm
RECONSTRUCTION & WIDENING' FROM 4 LANES TO 6 LANES{): . PROJECT MILEAGE : 6,76 MANAGER: UNI<l'IOWN REQ GLYNN DO UTIL 3-2-92;

CONG DIST, 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511082 IS AN ASSOCIATED PROJECT.
CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 511084 IS AN ASSOCIATED PROJECT.

PE 1993

UNDERWAY

ROW NONE $

0

CONST 1995

$ 8000

FED SHARE $ 7200

GA. SHARE $

800

0TH SHARE $

PE 1996 $

ROW NONE $

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

_o
0 4000 3600
400

CAMDEN 522690

SR 25/US 17 BRIDGE OVER ST. MARY'S RIVER /FLA STATF:\~ijjf\: '\( .

REPLACEMENT :bF THE EXISTING BRIDGES (S) , NO ADDED ijE'::i#/'

::::~ONG DIST. 1

PROJECT MILEAGE : . 00

....

STATUS: =~:R~o~NT~E~~;~:D TO COMMIT ANY FUNoi~q;=:ib~~:~1~,;

~~:~~u!i:~w!~I::I!R~~~

PE 1994

UNDERWAY

ROW 1995 $

5

CONST 1995

$ 3050

FED SHARE $ 2440

GA. SHARE $

610

0TH SHARE $

CAMDEN532480
STATUS:

SR 40 @ CR 81 AND I-95 SB ON/OFF RAMPS IN KINGStJlliD.

INTERSECTION IMPROVEMENT/ SAFETY

PROJECT MILEAGE: .14 - EXIST. LANES: 6 /PROPOSED

MANAGER: PETE BLOCKER

KINGSLAND SGN 10-5-92 FOR UTILITIES

T&S

SAFETY ADijp~:@j.iijps.

PE NONE

$

0

ROW LOCL

CONST 1995 $ 275

FED SHARE $ 248

GA. SHARE $

28

0TH SHARE $

CAMDEN 571000
STATUS:

A STUDY OF BIKE/PEDESTRIAN PATHS IN COASTAL GEORGIA PRELIMINARY tNGINEERING / ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STAN HAMES LGPA TO BE DONE BY CONTRACT

\ilil:foNG DIST. 1 ..:t
F'ffub sou~qt:lf~s. ENHANCE.
FEP~~- ~I:O~I'iAY ADMIN

PE 1995

$

125

ROW NONE

$

0

)CONST NONE

$

0

CAMDEN 571040
STATUS:

KINGSLAND DOWNTOWN 6 BLOCK AREA AND LANDSCAPE SIDEWALKS/ ENHANCEMENT PROJECT MILEAGE: ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STAN HAMES LGPA TO BE DONE BY CONTRACT

CONG- DIS;=:>1 FUND SOURCE: TRAN#)='NHANCE.
FEDERAL HIGHWAY AP~P~ FUNDS

PE LOCL

. ROW NONE

$

0

CONST 1997

$

365

FED SHARE $

292

GA. SHARE $

0TH SHARE $

73



Ellmlffl

~

~ ,,

~

i~

COUNTY P,I,NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM.
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CAMDEN 571050
STATUS:

WOODBINE WATERFRONT BOARDWALK, BICYCLE/PED, FACILITY/ ENHANCEMENT PROJECT MILEAGE : ,00 - EXIST. LANES: MANAGER: STAN HAMES LGPA TO BE DONE BY CONTRACT

LANDSCAPING
0

CONG DIST, 1
FUND SOURCE: TRANS, ENHANCE, FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 9

FISCAL YEAR

COST ESTS

PE 1995 $ ROW NONE $ CONST 1995 $
FED SHARE$
GA. SHARE$ 0TH SHARE$

59
0
609 487
12 134"

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CHARLTON SR 852/FOLKSTON FM CR 138 NE 521900 BRIDGES/ RECST. OR REHAB.
PROJECT MILEAGE: .87 MANAGER: PETE BLOCKER STATUS: CITY OF FOLKSTON SIGNED 1/5/90

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CHARLTON SR 40 E/FOLKSTON: l)EB MP 1. 522350 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 2.85 MANAGER: PETE BLOCKER STATUS: SEND LGPA IN 1994

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CHARLTON SR 94@ ST MARYS 531300 REPLACEMENT OF THE
PROJECT MILEAGE: 1.00 MANAGER: PETE BLOCKER STATUS: AGREEMENT SENT TO FLORIDA

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 10

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1992

UNDERWAY

CONST 1995

$ 2118

FED SHARE $ 1694

GA. SHARE $

424

0TH SHARE $

PE 1992

UNDERWAY

ROW 1995

$

13

CONST 1996

$

712

FED SHARE $

570

GA. SHARE $

142

0TH SHARE $

PE 1993 UNDERWAY

ROW 1996

$

2

CONST 1997

$ 2742

FED SHARE $ 2194

GA. SHARE $

823

0TH SHARE $ 1371

., -

IE!l.'!l:ll

~

~

~

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 11

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P. I .NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

----------------------------------------------L-----------------------------------------------------------------------------------

CHATHAM I-95 TRUCK RAMP & WEIGH STATION JUST SOtJTH/ SC LINE & 51Y010

SAVANNAH TIP lt 94-H-3

PE 1994 UNDERWAY

511010 WEIGH STATION / RECST. OR REHAB.

;:;:::;._

CONG DIST. 1

ROW 1995

$

161

PROJECT MILEAGE : .38 - EXIST. LANES: 0 )#R(?POSED LANES: 0

CONST 1995

$ 3212

MANAGER: J. GARLAND (C)

FUND SOURCE: NAT'L HIGHWAY

FED SHARE$ 2570

STATUS: LGPA NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

642

51Y010 IS AN ASSOCIATED PROJEC.T.

0TH SHARE $

::;~~~~~~E,G~E~ CHATHAM I-95@ CR 984/JIMMY DELOACH PKWY

}\

511060

i~~~T~Ui~i~~iii~;: 0 /PROPOSED:l~ES: 0

. MANAGER: D. CHURCH (M)

.-:::/;;:';:;/:::': \t

STATUS: REQ COUNTY DO ROW AND UTIL1TIES:: ~-16-93

SAVANNAH TIP f 91-H-8
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW LOCL

CONST 1997

$ 8305

FED SHARE$ 6644

GA. SHARE$ 1661

0TH SHARE$

CHATHAM 511180
STATUS:

I-16 AT MP 165.1, 164}~/)'.63.2, 162.3, AND

BRIDGES / RECST. OR RE.8.1\B(

PROJECT MILEAGE : . 00 - .....

ADDED MANAGER: NEIL DAVIS

( ] \..

SEND LGPA WHEN PROJECT rs

SAVANNAH TIP f 94-H-2 CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW NONE CONST

$

110

$

0

AFTER 97

CHATHAM 51Y010
STATUS:

I-95 TRUCK RAMP AND WEIGH STAT.;
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: UNKNOWN

CHATHAM 521495
STATUS:

SR 204/ABERCORN ST@ SOUTHWEST BYP INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANEs=:Q/=}
MANAGER: G. ROSS (M) CHATHAM COUNTY SGN FOR ROW & UTILITIES 4-24-92.

DIST. 1

FUND SOURCE: I-STATE MAINT.

_ FEDERA,L HIGHWAY ADMIN FUNDS

: s i i d f o \ l s -:

-:;:::::..AN ASSOCIATED PROJECT.

i:\;!~~~'.Jii~t i 91-H-14

FON~:,~gi'.i: SURFACE TRANilBi{!r:
FEQt~ 11rGHWAY ADMrn,filifos

CHATHAM 521770
STATUS:

:<::::::::/:}:::Jr:t{.. . ...

SR 26 FM BRY.ltNWOOD RD TOW/BULL RIV INCLD BIKE LANE & BRIDGE

RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

PROJECT MILEAGE : 1.94

.

MANAGER: G. ROSS (M)

COUNTY SGN OTIL & PAY 20% MATCHING FONDS BIKE PATH 6-26-92.

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

350

FED SHARE $

315

GA. SHARE $

35

0TH SHARE $

PE 1992

UNDERWAY

ROW LOCL

CONST 1997

$ 7297

FED SHARE $ 5838

GA. SHARE $ 1459

0TH SHARE $

1992 1996

UNDERWAY $ 200 AFTER 97

CHATHAM 521780
STATUS:

SR 26/GARDEN CITY FM CR 704 TO SR 25/0S 17;INCL CLVT EXT TORN LANES/ RECST. OR REHAB. PROJECT MILEAGE : .70 - EXIST. LANES: 4 /PROPOSED LANES: 5 MANAGER: D. SMITH GARDEN CITY SGN 1-25-93 UTIL; COUNTY HAS NO UTIL INVOLVED.

SAVANNAH q,IP CONG DIST .::,1
FUND SOURCE: HWY .::{~if.ii:;
FEDERAL HIGHWAY A!iM!N FONDS

PE 1992 UNDERWAY

ROW 1995

$

100

CONST 1995

$

826

FED SHARE $

743

GA. SHARE $

83

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 12

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL.

COST

-P--. -I.-N-O--. ----------------PRO-J-E-C-T--D-A-T-A----------------------------------------------CO-M--M-E-N-T-S------------------------

CHATHAM SR 26 FM 4-LN E/LYNES PKWY TO VICTORY DR/CS 188

SAVANNAH TIP i 87-H-18b

YEAR
,----

--------E-S-T-S --

PE 1993 -UNDERWAY

521855 RECONSTRUCTION & WIDENING FROM 2 LANES T0>4 LANES.

CONG DIST. 11 .

ROW LOCL

PROJECT MILEAGE: 1.38

CONST 1996

$ 5620

~~~:: {gi: STATUS:

1

S~Gf'l:~sil-30-90: ROW, UTILITIES/ti

CONSTRUCTION.

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

FED SHARE$ 4496 GA. SHARE$ 1686

0TH SHARE$ 2810

CHATHAM SR 25 FM 4-LN N/SR 204 NE TO sR,dOilit:iCL PARALLEr/ij~IDGE)

~f~::r:;~~:~lt:: 521860 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.

STATUS:

& u&~i]~~:}:0-16-90 (1% TAX i#9JECT)

CHATHAM 521867
STATUS:

t SR 2 5 /US 1 7 /OCEAN :~='@fPGEECHEE RIVER OVERFLOW :-: f
J REHAB. OF THE EXISTING BRIPGE{S). FROM 2 LANES TO ill&Es.

PROJECT MILEAGE : .00

MANAGER: G. ROSS (C)

-.::--::-.-.

CHATHAM COUNTY SIGNED 11/9/90 FbR

SAVANNAH TIP i 90-H-6
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
SAVANNAH TIP i ~O-H-7
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 521865-IS AN ASSOCIATED PRO.:JECT.

PE 1992

UNDERWAY

ROW LOCL

CONST 1997

$ 5976

FED SHARE$ 4781

GA. SHARE$ 1195

0TH SHARE$

PE 1992

UNDERWAY

ROW LOCL

CONST 1996

$

445

FED SHARE$

356

GA. SHARE$

89

0TH SHARE$

CHATHAM 522490
STATUS:

SR 26/US80 FM W OF BULL RIVER TO RECONSTRUCTION & WIDENING FROM.2 PROJECT MILEAGE : 5.77 MANAGER: G. ROSS {M) SEND LGPA IN 1997

CHATHAM 522610
STATUS:

SR-25/US-17 OVER THE SAVANNAH RIVER REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : ,00 MANAGER: D. CHURCH (M) SEND LGPA IN 1996

i 93-H-3

SOURCE: SURFACE TRANSPORT. HIGHWAY ADMIN FUNDS

J:f~. SAVANNAH

i 90-H-6

:coNG Disd\1

FUND)SbffifoE: BRIDGE PRO~~ /:
FEDEkAi/db:GHWAY Ari~1c~ fbNi:>S

PE 1995 ROW 1997 CONST

$

602

$

559

AFTER 97

PE 1996 ROW CONST

$ 150 AFTER 97 AFTER 97

CHATHAM 522670
STATUS:

RE-ROUTINGS~ 25/US 17 IN PORT WENTWORTH TO SR 30 RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .94 MANAGER: PETE BLOCKER SEND LGPA IN 1996

(~ji#9f
iUNo souRdfLsHfu.AcE TRANsPoIH
FEDERAL ,Atd:k#Ky ADMIN FUNDS .:{ }

PE 1995
ROW 1997 :-:-:=:::::=\tONST

$

15

$

91

AFTER 97

CHATHAM 52Y770
STATUS:

SR 26 FM BRYANWOOD RD TO BULL RIV (SHOWN FOR BIKE FUNDS 33B) BICYCLE/PED. FACILITY/ RECST. OR REHAB. PROJECT MILEAGE: 1.94 - EXIST. LANES: 2 /PROPOSED LANES: 4 MANAGER: G. BOULINEAU

SAVANNAH,.TIP CONG DIST .\1

ADMIN FUND SOURCE: TRANs):fiHulliCE.

FEDERAL HIGHWAY

FUNDS

521770 IS AN ASSOCIATED PROJECT.

PE NONE ROW 1996 CONST

$

0

$

0

AFTER 97

Emmi

..

c==i tam== ~

;.,'\.,," .....,....,.

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CHATHAM 531260
STATUS:

SR 204 EB FM MP 2.0-3.2;WB MP 3.7-4.7 Sl!:,,OF MELDRIM ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.20 MANAGER: PET-E BLOCKER
CHATHAM SGN 10-11-91 FOR UTILITIES.

SAVANNAH TIP i 92-H-7
CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 532510
STATUS:

SR 204/ABERCORN ST. @ EISHENHOWEibN SAVANNAH



INTERSECTION IMPROVEMENT / SAF:EiT'i{f:('>

\/:

PROJECT MILEAGE : . 21 - EXIST% tirnii:s: 7 /PROPOSED dW~s: 8

MANAGER: PETE BLOCKER

.,,,,:,, i::,_,_: --

SAVANNAH SGN FOR UTILITIE$)J:ff4"'93;COUNTY

SAVANNAH TIP lt 94-H-5 CONG DIST. 1
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

i!l!t~: CHATHAM
541900

:SR:~2~5~~AcL~T~/U~S~A1~7~@P~GO~~~lM E~:T@~;~iI~NrESA~VEASN:NAH4 /PROPosiB!1

5

MANAGER: PETE BLOCKER - :::,{

STATUS: REQ CITY OF SAVANNAH DO Row ::t

SAVANNAH TIP lt 93-H-1 CONG DIST. 11
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

CHATHAM 550550
STATUS:

DIAMOND CSWY FM FERGUSON AVE TO MCWHORTER DR

./ ::,,::,,c:::c:::;:::

RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES./}

PROJECT MILEAGE: 3.20

MANAGER: G. ROSS

CHATHAM SGN 11-20-92 FOR UTILITIES; SAVANNA--H: .

\}],AVANNAH TIP i 92-H-3 ):\ }~ONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FED~.HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 13

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1995

$

14

CONST 1996

$

660

FED SHARE $

528

GA. SHARE $

132

0TH SHARE $

PE NONE

$

0

ROW 1994

$

300

CONST 1995

$

228

FED SHARE $

205

GA. SHARE $

23

0TH SHARE $

PE NONE

$

0

ROW LOCL

CONST 1995 $

350

FED SHARE $

315

GA. SHARE $

35

0TH SHARE $

_PE 1993 ROW 1997 CONST

UNDERWAY $ 1810 AFTER 97

CHATHAM 550570
STATUS:

MIDDLEGROUND & MONTGOMERY CROSS RDS FM ABERCOR~::,:,~O ABRCRN EX-.-.-RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 2.80 MANAGER: G. ROSS CT REQ COUNTY PROVIDE DESIGN, DO ROW, UTIL % 20% CST

SURFACE Tilikifokf~
ABMrnJiti~os

PE LOCL ROW LOCL CONST 1997 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

3500 2800
700

CHATHAM 550580
STATUS:

WHITE BLUFF/COFFEE BLUFF RD FM LITTLE OGEECHEE RVR TO WILLOW RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 2.10 MANAGER: G. ROSS SEND LGPA IN 199

w;JJ;; SOURcklfitikFAcE TRANSPokf:f FEDERAL -HfoHWAY ADMIN

PE LOCL

ROW LOCL

::::::::.:::tONST 1997

$

FED SHARE$

GA. SHARE$

0TH SHARE$

9000 '7200 1800

CHATHAM 570830
STATUS:

SURVEILLANCE AND MONITORING SYSTEM IN SAVANNAH CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED. PROJECT MILEAGE : .00 MANAGER: BURTRIDDLE CONTACT TRAFFIC OPERATIONS

SAVANNAH,f!P i 94-H-6

CONG DIST .":11

-

fl~:f=; FUND SOURCE : HWY.,:
FEDERAL HIGHWAY ADMi~ FUNDS

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1995

$

578

FED SHARE $

520

GA. SHARE $

58

0TH SHARE $

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CHATHAM 570850
STATUS:

MCQUEENS ISLAND ABANDONED RAILROAD MULT:rJ?URPOSE TRA.IL
!~;~~~/~~~EA~~C~L~~~ ~ :~~~~E~is: 0 /trtoPOSED LANES: 0
MANAGER: KEITH GOLDEN
TO BE DONE BY ~ONTRACT.

SAVANNAH TIP t 94-H-8
CONG DIST. 1 & 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 14

FISCAL YEAR

COST ESTS

PE LOCL

ROW LOCL

CONST 1995

$

440

FED SHARE$

352

GA. SHARE$

0TH SHARE$

88

CHATHAM 570860
STATUS:

EXT. OF R. MCCORKLE SR BIKEWAY ONi(ifUif;GTON ISLJilit}>

BICYCLE/PED. FACILITY / ENHANCEMENif /

:

PROJECT MILEAGE : .oo - EXISTdLAN'ES: o /PROPOSED Jffiis: o

MANAGER: KEITH GOLDEN

TO BE DONE BY CONTRACT.

SAVANNAH TIP t 94-H-9
CONG DIST. 11
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996

$

110

FED SHARE$

88

GA. SHARE$

0TH SHARE$

22

CHATHAM 570870
STATUS:

VISITOR CENT~R REHABrt~iAfioN

.



MISCELLANEOUS IMPROVEMEN.TS.:. / ENHANCEMENT

}

PROJECT MILEAGE : .oo - txisT. LANES: o /PRoPostffi

MANAGER: KEITH GOLDEN

. . ..

TO BE DONE BY CONTRACT

SAVANNAH TIP t 94-H-7
CONG DIST. 1 & 11
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$ GA. SHARE $ 0TH SHARE$

1000 800
200

CHATHAM 570875
STATUS:

LANDSCAPING AT VARIOUS LOCATIONS IN SAVANNAH

LANDSCAPING/ ENHANCEMENT

.

PROJECT MILEAGE : .00 - EXIST.

MANAGER: KEITH GOLDEN

TO BE DONE BY CONTRACT

DIST. 1 & 11
SOURCE: TRANS. ENHANCE. ADMIN FUNDS-

CHATHAM 570880
STATUS:

OLYMPIC LANDSCAPING IN SAVANNAH, 1994

SAVANNAH &~, t 94-H-4

LANDSCAPING / ENHANCEMENT

:()'),:cONG DIS'ih)ll & 1

PROJECT MILEAGE : . 00 - EXIST. LANES: 0 ./PROPOSED LANES:f :o:r::::::::::=:>. :::\\\}::-:

MANAGER: E. LAWS NOT APPLICABLE

FUND)SOtfficE: NAT'L HIGHwi'i?>
FEoEilitib:GHWAY Abiji:N/ti:m'os

PE LOCL ROW LOCL CONST 1995 $
FED SHARE$
GA. SHARE $ 0TH SHARE$

1450 1160
290

PE 1994 UNDERWAY'

ROW LOCL

CONST 1995

$

625

FED SHARE$

500

GA. SHARE$ 125

0TH SHARE$

CHATHAM OLYMPIC LANDSCAPING IN SAVANNAH, 1995 570890 LANDSCAP ING / ENHANCEMENT . - .
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: E. LAWS STATUS: NOT APPLICABLE

CHATHAM 570900
STATUS:

OLYMPIC LANDSCAPING IN SAVANNAH, 1996 LANDS CAP ING / ENHANCEMENT . PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: E. LAWS NOT APPLICABLE

::::./AVANNAH TIP ::~~f;ijj'4
:/:::\CONG DIST. 11:i&?'F,:"'
;rn~; SOURctfl:j}:f~ L HIGHWAY
FEDE:RAL itlGii#AY ADMIN FUNDS /:

-:::::{;j;lffllli=:==

.. ::::!:~:i:i:!:l:(:!:::(:!:1:;::::

~~~~i:~,,i ., 1

91-H-4,.,:::!l:l

:'r::

FUND SOURCE: NAT't'.kih~:AY
FEDERAL HIGHWAY A,OM:j)f FUNDS

PE 1995

$

ROW LOCL

;:;;:,/CONST 1995. $

FED SHARE $

GA. SHARE $

0TH SHARE $

25
1094 875 219

PE 1996 $ ... 25

ROW LOCL

CONST 1996

$ 1094

FED SHARE $

875

GA. SHARE $

219

0TH SHARE $

Wllill:!mJ

~

~


~

~

~



COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994

Page 15

I

FISCAL YEAR

COST ESTS

CHATHAM 571110
STATUS:

OLYMPIC SIGNAL SYSTEM IN SAVANNAH
SIGNALS/ SAFETY PROJECT MILEAGE : .00 - EXIST. MANAGER: BURT RIDDLE CONTACT TRAFFIC OPERATIONS

CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995

$

ROW NONE $

CONST 1995 $

FED SHARE$

GA. SHARE$

0TH SHARE$

50
0 2000 1600
400

CHATHAM 5D5011
STATUS:

CAP. MAINT., VEHICLES,
-:irr:ctrr~ TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: CHATHAM MANAGER: STEVE KISH LGPA NOT APPLICABLE

CHATHAM 5D5012
STATUS:

CAP. MAINT , "--".,u..rr,,.T,._
TRANSIT PROJECTS FUNDS RECIPIENT: CHATHAM MANAGER: STEVE KISH -LGPA NOT APPtICABLE

ETC

CONG DIST. 1 & 11

CAPITAL 1995

$

340

FUND SOURCE: URBAN TRANSIT

FED SHARE $ 272

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

34

0TH SHARE $

34

CONG DIST. 1 & 11
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CAPITAL 1996

$

370

FED SHARE $ 296

GA. SHARE $

37

0TH SHARE $

37

CHATHAM 5D5015
STATUS:

PUBLIC TRANSIT SERVICE FOR SAVANNAH AND CHATHAM TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: CHATHAM AREA TRANSIT SYSTEM MANAGER: STE-i.JE KISH LGPA NOT APPLICABLE-

DIST. 1 & 11
SOURCE: URBAN TRANSIT ADMIN FUNDS

OPERATING 1995 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

4536 907
907 4536

GHATHAM 5D5016
STATUS:

PUBLIC TRANSlT SERVICE FOR SAVANNAH AND TRANSIT PROJECTS/ OPERATIONS
FUNDS RECIPIENT: CHATHAM AREA TRANSIT. SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE

i\<::QNG Disdd) & 11
FUNo::~a&~bi: URB~. _T~*-Pf/=' : :..OPERATIN~E~ 9::ARE :

FEQ~TRANSIT ADMIN{~ONDS

GA. SHARE $

0TH SHARE$

4266 896 896
4266

CHATHAM 5H0025
STATUS:

AREA 13A DIKE CONSTRUCTION DMCA/DIKE WORK/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 ~AGER: LUKE COUSINS NOT APPLICABLE

PE NONE $ ROW NONE $
1995 $ FED SHARE $ GA. SHARE $ 0TH SHARE $

0 0 4000
4000

CHATHAM 5H0030
STATUS:

JONES OYSTER BED DIKE CONSTRUCTION DMCA/DIKE WORK/ NEW CONSTRUCTION PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE COUSINS NOT APPLICABLE

FUND SOURCE:

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $ GA. SHARE $ 0TH SHARE $

0 0 3750
3750

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 16

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O-.----------------P-R-O-J-E-C-T--D-A-T-A----------.-. -----------------------------------C-O-M-M-' -EN-T-S---------------------------Y-E-A-R---------E-S-T-S--

CHATHAM AREA 14A DIKE CONSTRUCTION .

PE NONE

$

0

5H0035

DMCA/DIKE WORK/ NEW CONSTRUCTION PROJECT MILEAGE: .00 - EXIST. LANES:

0

/~OPOSED

LANES:

0

CONG DIST. 1

ROW NONE CONST 1995

$

0

$ 1000

MANAGER: LUKE COUSINS

FUND SOURCE: STATE HARBOR FUNDS

FED, SHARE $

STATUS: NOT APPLICABLE

GA. SHARE $ 1000

0TH SHARE $

CHATHAM DIKE SLOPE EROSION PROTECTION ...:::=:::::=::::::::::;:;::

i!tt .

580040 - DMCA/DIKE WORK / NEW CONSTRUC';r:{QW(/ :/

\ /:

PROJECT MILEAGE : 00 - EXIS.T{ LANE$: 0 /PROPOSED ilm1s: 0

MANAGER: LUKE COUSINS

STATUS: NOT APPLICABLE

CONG DIST. 1 FUND SOURCE: STATE HARBOR FUNDS

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 4500
4500

CHATHAM CHATHAM COUNTY HARBOR:MAlNTENANCE 5H0045 DMCA/DIKE WORK/ MAINTEN~CE
PROJECT MILEAGE : .oo - EX:[ST. LANES: 0 /PROPos.iBmis: 0
MANAGER: LUKE COUSINS
STATUS:_ NOT APPLICABLE

CONG DIST. 1 FUND SOURCE: STATE HARBOR FUNDS

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

980

FED SHARE $

GA. SHARE $

980

0TH SHARE $

CHATHAM 5V1011
STATUS:

ELDERLY AND DISABLED VEHICLES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH

DIST. 1 & 11

CAPITAL 1995

$

56

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

45

FEDERAL TRANSIT ADMIN FUNDS '.,

GA. SHARE$

5

0TH SHARE $.

6

CHATHAM 5Vl012
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPI!NT: AGENCIES IN CHATHAM MPO AREA MANAGER: STEVE KISH

DI_~)!] & 11

oiMrnitJ FUNri'.'::Jd~&f: ELDERLY &

1996

$

~:~TAL FED SHARE$

58 46

FEDitmdrRANsIT -AriMIN ftfilos

GA. SHARE$

6

0TH SHARE$

6

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

EFFINGHA I-16 WIDEN 10 BRIDGES @ MP 138.3; 145. 51119X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 MANAGER: STATUS:

147.2/BRYAN

CONG DIST. 1 ,
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS -

EFFINGHA CR 307@ EBENEZER CREEK 532390 BRIDGES/ REPLACEMENT
PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER STATUS: EFFINGHAM COUNTY SGN DO

CONG DIST. l & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS,

22-Feb-1994 Page 17

FISCAL YEAR

COST ESTS

PE 1994 UNDERWAY

ROW NONE $

0

CONST 1997

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1993 UNDERWAY

ROW LOCL

CONST 1997

$

126

FED SHARE$ 101

GA. SHARE$

25

0TH SHARE$

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

EVANS 522005
STATUS:

SR 73/0S 301 FM TATTNALL CO LINE TO S

RECONSTRUCTION & WIDENING FROM 2 LANES

PROJECT MILEAGE: 6.75

.

MANAGER: PETE BLOCKER

REQ TATTNALL P OTL 9/91;SGN EVANS

7/93 P.O

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FONDS

22-Feb-1994 Page 18

FISCAL YEAR

COST ESTS

PE 1993

UNDERWAY

ROW 1995

$

200

CONST 1997

$ 5705

FED SHARE $ 4564

GA. SHARE $ 1141

0TH SHARE $

liEZlmaJ

~

~

1-.

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GLYNN 511095
STATUS:

o,a I-95 FM US 17 /SR 520 S/BRUNSWICK TO US 341 PHASE II

RECONSTRUCTION & WIDENING FROM 6 LANES

LANES.

PROJECT MILEAGE : 6.68

MANAGER: M. REYNOLDS

SEND LGPA WHEN PROJECT IS ADDED

BRUNSWICK TIP i
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 19

FISCAL YEAR

COST ESTS

PE ROW NONE CONST

$

250

$

0

AFTER 97

GLYNN 511102
STATUS:

I-95@ ALTAMAHA RIVER & BRIDGES/ REPLACEMENT PROJECT MILEAGE : . 00
=A~~~~NMco:~O~D!cINTOsJiig!t: D0 UTILITIES

GLYNN 511105
STATUS:

~!Mfffi,flE I-95 FM US 341 TO ALTAMAHJ\: RIVER@ MCINTOSH
RECONSTRUCTION & WIDENiN<fFROM 6 LANES TO 8

II

PROJECT MILEAGE : 8.66

MANAGER: M. REYNOLDS

SEND LGPA WHEN PROJECT IS

CONG DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 51Y102 IS AN ASSOCIATED PROJECT.
BRUNSWICK TIP i
CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN-FUNDS

PE 1995

$

ROW NONE

$

CONST 1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

300 0
15000 13500
1500

PE ROW NONE CONST

$

250

$

0

AFTER 97

GLYNN 520890
STATUS:

SR 25/BRUNSWICK FM S OF TORRAS RECONSTRUCTION & WIDENING FROM PROJECT MILEAGE : 1.97 MANAGER: D. CHURCH {C) BRUNSWICK SIGNED 2/22/89 UTILITIES

GLYNN 521350
STATUS:

SR 520/US 17 FM I-95 TO JEKYLL ISLAND CAUSEWAY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.50 MANAGER: PETE BLOCKER REQ GLYNN DO UTIL 3/91; 9-13-92 LETTER-NO UTIL COST

GLYNN 521355
STATUS:

SR 520/US 17@ FANCY BLUFF CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 LANES. PROJECT MILEAGE : .00
MANAGER: PETE BLOCKER NO UTILITY REIMBURSEMENTS ON. THIS PROJECT 1-6-94

GLYNN 522040
STATUS:

SR 25/BRUNSWICK-ROADWAY & APPROACH WORK TO SIDNEY LANIER BR BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: J. GRAYBEAL REQ CO BE RESPONSIBLE FOR SAFETY/MAINTENANCE OF OLD BR 8/93

FUND SOURCE: NAT'L HIGHWAY ::F::::E:::_D:rERA.L... HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW 1995

$ 1815

CONST 1996

$ 4048

FED SHARE $ 3238

GA. SHARE $

810

0TH SHARE $

BRUNSWICK::;iP f BATS93-03

PE 1992

UNDERWAY

{CONG Dis~{jJ

ROW NONE

$

0

~~~ml~'!~w:~Ti$k~!;:IT!~~>- .}), CONST 1995

$

FED SHARE $

GA. SHARE $

4325 3460
865

521'.355 ?is AN ASSOCIATED(~ROJECT . .}C

0TH SHARE $

PE 1991

UNDERWAY

ROW NONE

$

0

.FtiND SOURct't!ikioGE PROGRAM '

:e:;:}:\CONST 1995

$ 2100

FED SHARE $ 1680

~~~j~d~J'!~s~~i~E~~~tj~~f ]C{i

GA. SHARE $

420

0TH SHARE $

BRUNSWicid'.l'IP t BATS93A6Y

CONG DIST. ?1

... .. .

FUND SOURCE: STAT2f&t6~
FEDERAL HIGHWAY Jffi~fN FUNDS

PE 1992

UNDERWAY

ROW 1995

$

100

CONST 1995

$ 16600

FED SHARE $ 8300

GA. SHARE $

0TH SHARE $ 8300

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GLYNN 522045
STATUS:

SR 25/BRUNSWICK.MAIN SPAN OF BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: J. GRAYBEAL NOT APPLICABLE .

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJEC:T LISTING BY COUNTY FY 1995/FY 1997

COMMENTS

& 52Y045

BRUNSWICK TIP f BATS93-01

CONG DIST. 1

.

FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

GLYNN 522310
STATUS:

SR 27@ I-95 FM W/CRISPEN BLVD/c:i~l~:fo W/YELLow\ituFF CRK

RECONSTRUCTION & WIDENING FROM)s::fJilits TO 6 LANES.

PROJECT MILEAGE : . 87

.. . "''='='='=""

~1: :~t~!~~s!i~~ ~gs~L 11Mi'F

REFUSED 8-26-93

BRUNSWICK TIP f BATS93-02 CONG DIST. 1 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

GLYNN 522730
STATUS:

SR 25 AT TALMADGE A~mmtn; BRUNSWICK
INTERSECTION IMPROVEMEN1 I SAFETY

PROJECT MILEAGE: .27 - EXIST. LANES:

MANAGER: BURT RIDDLE

==

REQ CITY OF BRUNSWICK DOR~:

BRUNSWICK TIP f BATS94-08 CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

GLYNN 52Y045
STATUS:

SIDNEY LANIER BRIDGE MAIN SPAN - FOR BRIDGES/ NEW CONSTRUCTION PROJECT MILEAGE : .00 MANAGER: NOT APPLICABLE

DIST. 1
FUND SOURCE: STATE FUNDS_ lfEQJ:!l~ HIGHWAY ADMIN FUNDS

GLYNN: 570840
STATUS:

HISTORIC WAT~RFRONT

BRUNSWicKiffp f BATS94-14

ttmns MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED MANAGER: KEITH GOLDEN

LANES:,8:-:0-,.:::>:<r-<. >::.c:pf_-?-,?.__: '.DI STY :f
FUNo :sdTMdi = TRANS..

ENHANCE> -

TO BE DONE BY CONTRACT

FEDERAiDfi:GHWAY Af.l~rN

GLYNN 57100X
STATUS:

A STUDYOF BIKE/PEDESTRIAN PATHS IN COASTAL GEORGIA;
UNKNOWN/ UNKNOWN PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER:

FUND SOURc:ii!\\}4!:~. ENHANCE. FEO~HfG!lti)AY ADMIN

22-Feb-1994 Page 20

FISCAL YEAR

COST ESTS

PE NONE $

ROW NONE

$

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 59315 47452 11863

PE 1992 UNDERWAY ROW 1993 UNDERWAY CONST 1995 $ 2781
FED SHARE $ 2225 GA. SHARE $ 556 0TH SHARE $

PE NONE $

0

ROW LOCL

CONST 1995 $ 270

FED SHARE $ 270

GA. SHARE $

0TH SHARE $

PE NONE

$

ROW NONE

$

CONST 1996 $

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 3186 1593
1593

PE LOCL

ROW LOCL

CONST 1995 $ 813

FED SHARE $

650

GA. SHARE $-

0TH SHARE $ 163

PE 1995. $

0

ROW NONE $

0

NONE $

0

GLYNN 5V1014
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS.RECIPIENT: AGENCIES IN GLYNN MPO AREA MANAGER: STEVE KISH

FUND SOURCE: FEDERAL TRANSIT

CAPITAL 1995

$

17

FUND FED SHARE$

14

GA. SHARE$

1

0TH SHARE$

2

. .

. ,,

llm!l':I

~

~

~

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 21

FISCAL YEAR

COST ESTS

GLYNN 5Vl015
STATUS:

ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN GLYNN MANAGER: STEVE KISH

CONG DIST. 1

CAPITAL 1996

$

17

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

14

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

2

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

JEFF DAV SR 19 FM McCLOUD RD/CR 321 TO NORTH OF ~c:~~.uu

522660 TURN LANES / SAFETY

. '

PROJECT MILEAGE: .46 - EXIST. LANES:

MANAGER: PETE BLOCKER

STATUS: JEFF DAVIS SIGNED FOR UTILITIES

CIR/CR 146 LANES: 3

CONG DIST. 8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-199.4 Page 22

FISCAL YEAR

COST ESTS

PE 1993

UNDERWAY

ROW 1995

$

126

CONST 1996

$

365

FED SHARE $

365

GA. SHARE $

0TH SHARE $

I

.,

I mm:m,

~

~

~

~

~



COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
.COMMENTS

LIBERTY 520781
STATUS:

SR 196 FM US84/SR 38 TO SR 17/SR 25 SW RECONSTRUCTION&. WIDENING FROM 2 LANES PROJECT MILEAGE : 8.85 MANAGER: M. REYNOLDS SEND LGPA IN 1997

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FONDS

22-Feb-1994 Page 23

FISCAL YEAR

COST ESTS

PE 1992 ROW 1996 CONST

UNDERWAY

$

950

AFTER 97

LIBERTY 521190
STATUS:

SR 196/@ BAKER SWAMP SLOUGH REPLACEMENT OF THE EXISTING 0~~1/~~~, PROJECT MILEAGE : .20 MANAGER: M. REYNOLDS COUNTY AGREED 12-17-84

LIBERTY 522570
STATUS:

US 84 CONNECTOR FM S CONSTRUCTIONOF NEW PROJECT MILEAGE : 3.70 MANAGER: GENE POWELL (M) SEND LGPA WHEN PROJECT IS

CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. l GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1985 UNDERWAY

ROW 1987

UNDERWAY

CONST 1997

$

459

FED SHARE $

367

GA. SHARE $

92

0TH SHARE $

PE 1995 ROW CONST

$

380

AFTER 97

AFTER 97

LIBERTY 531180
.STATUS:

SR 196 FM NW CR 119 TO 4-LANE SEC@ JOYNER DR/CR RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 PROJECT MILEAGE : 2.78. MANAGER: PETE BLOCKER LIBERTY SGN 3-11-92 UTIL AND HINESVILLE

LIBERTY 541940
sTATUS:

FRANK COCHRAN DR EXT FM SR 196@ CS 8823 TO US CONSTRUCTION"OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 1.20
MANAGER: GENE POWELL, (M) SEND LGPA IN 1995

DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

~=~'::~.111;i \=coNG Distl

SURFACE TRJ&J1)Jt@'.

FEDEAAt:ltIGHWAY ADMIN'FUNDS

PE 1992

UNDERWAY.

ROW 1994

$

405

CONST 1997

$ 4612.

FED SHARE $ 3690

GA. SHARE $

922

0TH SHARE $

PE 1993 ROW 1996 CONST

UNDERWAY $ 3100 AFTER 97

LIBERTY THE LIBERTY TRAIL.FM RICEBORO & MIDWAY TO SUNBURY-HIST SITE 570990 BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: T. LONG STATUS: . LGPA TO BE DONE BY CONTRACT

LIBERTY 571030
STATUS:

CEMETERY WALL REPAIR@ MIDWAY CHURCH MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: T. LONG LGPATO BE DONE BY CONTRACT

4~s. FOND SOORci'i: 1

FED

., . :G .. ''Ay ADMI

CONG DIST. :,1
FUND SOURCE: FEDERAL HIGHWAY

PE NONE $

0

ROW NONE

$

0

1995

$

125

FED SHARE $

100

GA. SHARE $

0TH SHARE $-

25

PE LOCL

ROW NONE

$

0

CONST 1997

$

48

FED SHARE $

38

GA. SHARE $

0TH SHARE $

10

COUNTY P.I.NO.

DESCRIPTION . PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

LONG;,, 5B1304.
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FONDS RECIPIENT: LONG MANAGER: STEVE KISH

CONG DIST. 1
FOND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FONDS

LONG 5B1305
STATUS:

COUNTY OPERATED PUBLIC TRANSIT FACILITIES/ FUNDS RECIPIENT: LONG MANAGER: STEVE KISH

CONG DIST. 1
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 24

FISCAL YEAR

.COST ESTS

OPERATING 1995

$.

39

E:ED SHARE $

23

GA. SHARE $

0TH SHARE $

16

OPERATING 1996

$

42

FED SHARE $

25

GA. SHARE $

0TH SHARE $

17

.

4,

. {

im:!!m9 rrz==

~

~

lvJJ,M

~~

\ ......

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

MCINTOSH I-95@ ALTAMAHA RIVER AND GLYNN 51110X UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: L. SEABROOK STATUS:

CONG DIST. 1
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS 511102 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 25

FISCAL YEAR

COST ESTS

PE 1995 $

0

ROW NONE

$

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

MCINTOSH I-95 FM SR 57 TO LIBERTY CO 511130 RECONSTRUCTION & WIDENING
PROJECT MILEAGE : 8.26
MANAGER: M. REYNOLDS (M) STATUS: MCINTOSH COUNTY SIGNED

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 51Y130 IS AN ASSOCIATED PROJECT.

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1997

$ 25943

FED SHARE $ 20754

GA. SHARE $ 5189

0TH SHARE $

MCINTOSH I-95@ ALTAMAHA 51Yl02 UNKNOWN/ UNKNOWN
PROJECT MILEAGE MANAGER: STATUS:

PE

AFTER 97

CONG DIST. 0 & 0

ROW

AFTER 97

0

CONST 1995 $ 3000

FUND SOURCE: NAT'L HIGHWAY

FED SHARE $ 2400

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 600

511102 IS AN ASSOCIATED PROJECT.

0TH SHARE $

MCINTOSH I-95 FM SR 57 TO LIBERTY CO LINE 51Y130 RECONSTRUCTION & WIDENING FROM 2
PROJECT MILEAGE : 8.26 MANAGER: UNKNOWN STATUS: MCINTOSH COUNTY SIGNED FOR UTILITIES
MCINTOSH SR 25/US 17@ BUTLER RIVER 1 MI SOUTH OF 522240 REPLACEMENT OF THE EXISTING BRIDGES (S) . NO ADDED LANES. ,:
PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER STATUS: MCINTOSH SIGNED.FOR UTILITIES 6-9-92

DIST. 1
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS :5.lff361s AN ASSOCIATED PROJECT.
,:-:-:->:-:

PE 1993

UNDERWAY,

ROW NONE

$

0

CONST 1997

$ 6000

FED SHARE $ 5400

GA. SHARE $

600

0TH SHARE $

PE 1993 UNDERWAY

ROW 1995 $

5

CONST 1997

$ 3672

FED SHARE $ 2938

GA. SHARE $

734

0TH SHARE $

MCINTOSH CR 59 E OF JCT W/SR 99@ UNNAMED STREAM 570750 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER STATUS: REQ COUNTY DO ROW, UTILITIES & DETOURS 8-26-93

\i{APNG DIST.
FUND souRci:dMiHDGE
FEDERAL :itfdftij11.y

PE 1994

UNDERWAY

ROW LOCL

:-:-:-:-::=:=:=;,:=tbNST 19 9 6

$

230

FED SHARE $

184

GA. SHARE $

46

0TH SHARE $

MCINTOSH CITY OF DARIEN HISTORIC DISTRICT/LANDSCAPE 571020 BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STAN HAMES STATUS: LGPA TO BE DONE BY CONTRACT

CONG DIST. \1 FUND SOURCE: TRANsff imkANcE.
FEDERAL HIGHWAY iIDM:i:_jif FUNDS

PE LOCL

ROW NONE $

0

CONST 1995

$

250

FED SHARE $

200

GA. SHARE $

0TH SHARE $

50

.GEORGIA.DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 26

PROJECT LISTING BY COUNTY FY 1995/FY 1997

. COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-------------------------.----------------------' ------------------------------------------------------------------------------------

MONTGOME SR 135 AT OCONEE CREEK

PE 1992 UNDERWAY

522250 REPLACEMENT OF THE EXISTING BRIDGES(S).

CONG DIST. 1

ROW 1994

$

44

PROJECT MILEAGE : .00

CONST 1995

$

572

MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

458

STATUS: MONTGOMERY COUNTY SIGNED 6-26-91

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

114

522252 IS AN ASSOCIATED PROJECT.

0TH SHARE $

MONTGOME SR 135 AT BUCKHORN CREEK NORTH 522252 REPLACEMENT OF THE EXISTING 0~~~!~~~~1
PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER STATUS: MONTGOMERY SGN 6-26-91

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 522250 IS AN ASSOCIATED PROJECT.

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1995

$

337

FED SHARE $

270

GA. SHARE $

67

0TH SHARE $

MONTGOME SR 15 BTWN HIGGSTON 522520 ADDITION OF A PASSING
PROJECT MILEAGE : 2.40 MANAGER: PETE BLOCKER STATUS: SEND LGPA IN 1996

CONG DIST. 1
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW 1997 CONST

$

27

$

5

AFTER 97

MONTGOME COUNTY OPERATED PUBLIC TRANSIT SERVICE 5B1309 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MONTGOMERY MANAGER: STEVE KISH STATUS:.
MONTGOME COUNTY OPERATED PUBLIC TRANSIT SERVICE 5B1310 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: MONTGOMERY MANAGER: STEVE KISH STATUS:

DIST. 1

OPERATING 1995

$

36

FUND SOURCE: RURAL TRANSIT

~

FED SHARE$

22

f~~~ TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

14

])t::99rc; Did:tti . ..,,.:::,:-..::=::::.:;::::::

1996 . $

38

FED SHARE$

23

GA. SHARE$

0TH. SHARE $

15



r,

- .....

~

li!!lll!!5l!l!

~

~



COUNTY P:I.NO.

DESCRIPTION PROJECT DATA

PIERCE 531280
STATUS:

SR 203@ ALABAHA RIVER OFLW REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER PIERCE SIGNED FOR UTILITIES

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PIERCE 531285
STATUS:

SR 203@ ALA.BARA RIVER REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER REQ PIERCE COUNTY DO

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PIERCE 532470
STATUS:

SR 15 OVER BURNEY REPLACEMENT OF THE PROJECT MILEAGE : .00 MANAGER: SEND LGPA IN 1995

CONG DIST. 1
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PIERCE 5Bl314
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: PIERCE MANAGER: STEVE KISH

PIERCE 5B1315
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PIERCE MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT FED.:.;-_E::: RAL TRANSIT ADMIN FUNDS
...==::::::;:::

22-Feb-1994 Page 27

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1995 $

5

CONST 1995

$

386

FED SHARE $

309

GA. SHARE $

77

0TH SHARE $

PE 1993 UNDERWAY

ROW 1995 $

1

CONST 1995

$

745

FED SHARE $

596

GA. SHARE $

149

0TH SHARE $

PE 1994 UNDERWAY

ROW 1996 $

1

CONST 1997

$

627

FED SHARE $

502

GA. SHARE $

125

0TH SHARE $

OPERATING 1995

$

41

FED SHARE$

24

GA. SHARE$

0TH SHARE$

17

1996 $

43

FED SHARE$

25

GA. SHARE$

0TH SHARE$

18

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TATTNALL SR 73/US 301 FM N CL/GLENNVILLE TO EVANS.CO LINE 522000 RECONSTRUCTION & WIDENING FROM 2 LANES TQ,:,~ LANES.
PROJECT MILEAGE : 7.16
STATUS: ~A;!~~N~i,u~~~c~:l;SGN EVANS 10-8-,9:iJBii410-8-91 P.UTIL

CONG DIST. 1
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

TATTNALL SR 23 @ THOMAS CREEK 2 MI SE OF.

522260 REPLACEMENT OF THE EXISTING BRti5.Gt'.f3:(sj . NO ADDED IJffi!s.

PROJECT MILEAGE : .00

~;dJ]Jii STATUS: ~~;~~LP~;~N~~o~~~:ED

DO UTILITIES.

TATTNALL SR 30/0S 280: OVER -:rit8M.($ CREEK NE OF REIDSVILLE
522620 REPLACEMENT OF .THE EXIST!~9 BRIDGES (S) . NO ADDED/Pw.ts; PROJECT MILEAGE : .00
MANAGER: STATUS: SEND LGPA IN 1996

CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TATTNALL SR 147@ OHOOPEE RIVER 4 MI 531290 REPLACEMENT OF THE EXISTING
PROJECT MILEAGE : .00 MANAGER: PETE BLOCKER STATUS: REQ TATTNALL COUNTY DO UTILITIES 1-24-92

DIST. 1
FUND SOURCE: BRIDGE PROGRAM fEl,)!ilMI, HIGHWAY ADMIN FUNDS

TATTNALL SR 196 OVER BEARD'S CREEK & .LONG COUNTY 541960 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00
MANAGER: STATUS: SEND LGPA IN 1995

22-Feb-1994 Page 28

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1995

$

386

CONST 1997

$ 6064

FED SHARE $ 4851

GA. SHARE $ 1213

0TH SHARE $

PE 1992

UNDERWAY

ROW 1995

$

5

CONST 1995

$

751

FED SHARE $

601

GA. SHARE $

150

0TH SHARE $

PE 1995 ROW 1997 CONST

$

10

$

1

AFTER 97

PE 1993

UNDERWAY

ROW 1995

$

5

CONST 1995

$ 3722

FED SHARE $ 2978

GA. SHARE $

744

0TH SHARE $

PE 1994

UNDERWAY

ROW 1996

$

1

CONST 1997

$ 1100

FED SHARE $

880

GA. SHARE $

220

0TH SHARE $

~

~

~

r.:::::l!lml



~

~ 'I

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 29

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

---------------------------------------------------------------

~----------------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E--ST--S--

TELFAIR SR 30/US 280@ TURNPIKE CREEK 1.2 MI E

PE 1994 UNDERWAY

532560 REPLACEMENT OF THE EXISTING BRIDGES(S).

CONG DIST. 8

ROW 1995

$

10

PROJECT MILEAGE : .23

CONST 1995

$

583

MANAGER: PETE BLOCKER

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

466

STATUS: TELFAIF COUNTY SIGNED FOR UTILITIES

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

117

0TH SHARE $

TELFAIR 5Bl319
STATUS:

COUNTY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1995

$

51

FUND SOURCE: RURAL TRANSIT

FED SHARE $

29

FEDERAL TRANSIT ADMIN FONDS

GA. SHARE $

0TH SHARE $

22

TELFAIR 5Bl320
STATUS:

COUNTY OPERATED TRANSIT FACILITIES/ FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH

CONG DIST. 8

OPERATING 1996 $

54

FUND SOURCE: RURAL TRANSIT

FED SHARE $

31

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

23

TELFAIR 5C2319
STATUS:

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: TELFAIR MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 8

CAPITAL 1995

$

29

SOURCE: RURAL TRANSIT

FED SHARE $

23

TRANSIT ADMIN FUNDS

GA. SHARE $

3

0TH SHARE $

3

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

TOOMBS SR 130 @ SWIFT CREEK 1 MI NE OF VIDALIA>.
522270 REPLACEMENT OF THE EXISTING BRIDGES(S). tlQ ADDED LANES.

CONG DIST. 1

STATUS:

~:~~~:i~~rh~~~!~6-27-91 FOR UTILITi~~:;: ..--;--

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

TOOMBS 522320
STATUS:

SR 30 FM MORNINGSIDE TO BROAD FQji/~8ilk ST {& 1:ti~ PAIR)
CONSTRUCTION OF NEW ROUTE WITli:J( i'.Ji.NE$ PROPOSED.
PROJECT MILEAGE : 2.15
~A;~~~B~. D~~~:E:Ii~iiti::li):~:r VIDALIA SGN UTIL iii5-93

;~~~~
STATUS:

di~lt Eg~ij~~~L~~~~E~~f~ i:P~~,~~~TR5~~a:D

NO ADDED

PROJECT MILEAGE: 1.00

MANAGER: PETE BLOCKER

>::::,:::>.=:-:-.

TOOMBS SGN DO ROW, UTILITIES'iANJ:l

CONG DIST. l FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 1 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 30

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1995

$

6

CONST 1995

$

824

FED SHARE $

659

GA. SHARE $

165

0TH SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY

$

394

AFTER 97

PE 1995 ROW LOCL CONST

$

8

AFTER 97

.

mliCil!a

ll!!S'llm

l!!i!ffl!!!!

l!!l!!ml

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATIQN IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WARE 521530
STATUS:
WARE 522775
STATUS:

SR 4/0S 1/WAYCROSS FM N/BLACKSHEAR AVE TQ CR 465@ JAMESTOWN RECONSTRUCTION & WIDENING FROM 2 LANES T.4 LANES.

t8l.~~:~]~Z- ~t~~R B~~~~~~; PROJECT MILEAGE : 1.51

;E~~~:D

DOT TO BOY ROW

SR 38/os 84 OVER GREASY BRANCH, ;et}ltf,tr/!,

~~h&mR CREEK

REHAB. OF THE EXISTING BRIDGEJ.$)J::~6M 2 LANES TO 4\LANES.

PROJECT MILEAGE : . 00

... ....

MANAGER: M GANNAWAY (M)

SEND LGPA IN 1997

CONG DIST. l GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FONDS
CONG DIST. 1 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS 522770 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 31

FISCAL YEAR

COST ESTS

PE 1992 ROW 1997 CONST

UNDERWAY $ 1550 AFTER 97

. PE 1995 ROW NONE CONST

$

33

$

0

AFTER 97

WARE 570970
STATUS:

<:#lif&' ALONG SR 4 FROM L. S .

SP TO WAYCROSS &

BICYCLE/PED .. FACILITY /:t#!!ANCEMENT

PROJECT MILEAGE: .00 - EXIST. LANES: 0

MANAGER: NEAL WILKES .

LGPA TO BE DONE BY CONTRACT

CONG DIST. 1 0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW NONE

$

0

CONST 1997

$ 1250

FED SHARE $ 1000

GA. SHARE $

0TH SHARE $

250

I

WARE 570980
STATUS:

RESTORE DEPOT & RAILWAY EXPRESS IN WAYCROSS MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE: .00 - EXIST. LANES: 0 MANAGER: NEAL WILKES LGPA TO BE DONE _BY CONTRACT

DIST. 1
SOURCE: TRANS. ENHANCE. HIGHWAY ADMIN FUNDS

PE 1995

$

ROW NONE

$

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

80 0
1170 936 16 250

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

WAYNE 52258X
STATUS:

SR 27/US 341 FM CL SURRENCY RECONSTRUCTION & WIDENING. PROJECT MILEAGE : .00 MANAGER: UNKNOWN

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 1 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 522580 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 32

FISCAL YEAR

COST ESTS

PE 1995 $

0

ROW 1996

$

0

CONST 1997

$

0

FED SHARE$

GA. SHARE$

0TH .SHARE$

: I

~

~

~

COUNTY P.I,NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WHEELER 5Bl324
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH

CONG DIST. 8
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

WHEELER 5B1325
STATUS:

COUNTY OPERATED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: WHEELER MANAGER: STEVE KISH

I
WHEELER 5C2324
STATUS:

ONE CONVERSION VAN TRANSIT FACILITIES FUNDS RECIPIENT: MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. B FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS
CONG DIST. 8 FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 33

FISCAL YEAR

COST ESTS

OPERATING 1995

$

36

FED SHARE $

21

GA, SHARE $

0TH SHARE $

15

OPERATING 1996

$

38

FED SHARE $

22

GA, SHARE $

0TH SHARE $

16

CAPITAL 1995

$

29

FED SHARE $

23

GA. SHARE $

3

0TH SHARE $

3

=

=

~

COUNTY P.I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BARTOW
610950
STATUS:

I-75 MILL ANO INLAY FM US 411/SR61 TO SR. 140

RIDING SURFACE REHABILITATION. SURFACE//~RIND, SE.AL, STRIPE ETC.CONG DIST. 7

PROJECT MILEAGE : 12.10 - EXIST, LANES: O.>/PROPOSED LANES: 0

MANAGER: L. SEABROOK

- -- -

NOT APPLICABLE

':,<~_:'.;': ,-'

FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

,,:,it

BARTOW 610960
STATUS:

I-'15 AT SR 20

/)}:<,;'

RECONSTRUCTION &. WIDENING FROM''"f ,-IJ\NEs TO 4

PROJECT MILEAGE : .OO
MANAGER: GENE PDmLL

,;,.,: _, :j;_():"

BARTOW COUNTY SIGNED l0-4i93)/!Jit UTILITIES

,,.;f~,,--,

CONG DIST. 7
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

BARTOW__ 620633
BAR'rOW
621410 STATUS:

.... :- ' -: : ,. -c

SR 61 @ TWO ETOWAH RIV'Eti,0VERFLOWS

,--,;'

REPLACEMENT OF THE EXISTtNG BRIDGES(S). FROM 2 T6'TiANES.

CONG DIST. 7

PROJECT MILEAGE : .36 , ,.

,,,:;,:\ '_'./

;;~l::rll~L. -~-?; 7 ~~t~~Ri2 a4~~~~~D~ITY sIG;i~_fl,~/84..,

rgt AS ,_

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
621255 rs AN ASSOCIATED PROJECT.

,,,',,.

-~hi\:lif: SR 113 RELOC_FM PRESENT SR 113 TO CR 636;T~~::E TO

,:h,c, 00'' '.:),,,.

RECONSTRUCTION & WIDENING. NO LANE ADDITION PROP9!JE_Q,j,,I,:--

.._(:_ONG DIST. 7

PROJECT MILEAGE : 7. 70

MANAGER: M GANNAWAY (CM)

,,,: FUND SOURCE: SURFACE TRANSPORT.

BARTOW REFUSED 11-23-92; EMERSON REFUSED

F~O~l?J\L. HIGHWAY ADMIN FUNDS

d,:, if'.i:

BARTOW 621430
STATUS:

SR 113 FM S/TAYLORSVILLE CL NE TO CR 31/STILESBORO/POLK RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.57 MANAGER: M GANNAWAY (CM) REQ POLK/ UTIL 6/91:BARTOW REFUSED 11/92:cITY NO UTIL

BARTOW 621440
STATUS:

SR 113 FM CR 31/STILESBORO NE TO SR 61 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 4.39 MANAGER: M GANNAWAY (CM) BARTOW COUNTY REFUSED 11-23-92

--,_:cONG DIST<,- :t-7.

-,,,,, (,,;,!,

. _,.:;:;:{.'

FUNp_,~oURbE; suRF-AcE TRMi~i6~4':

FEDERliJ0HIGHWAY ADMIN 'Fti~i:fS

E;2U:Wi i::s AN Assoc_:r:~~Ei;)/PRoJEcT

:

:-.. (

...,.,.,..

'L<.
'

:;

,.;; .<:','"" -

cc.-,.,.

:.. 'S'' .. ,'

:'...':tcr'.~,:C':(O' NG DIST. 7 .;

c;,.,:~~ soua_citts_ciRFAcE TRANsP6k&t:

FEDERAL.HIGHWAY ADMIN FUNDS " - ,

aARTOW 62168X
STATUS:

SR 61@ 3 LOCATIONS PAULDING & BARTOW .. SEE PAULDING CO UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES:. 0 /PROPOSED LANES: 0 MANAGER:

CONG DIST. ,7

.,.~ .
,-;:.\/Y

FUND SOURCE: SURFA~i-:_i;~SPORT.
FEDERAL HIGHWAY AD!iIN FUNDS
621680 rs AN ASSOC~ATED Pfl.OJECT.
,, ,-:,;:,,'.:::

22-Feb-1994 Page 1

FISCAL YEAR

COST ESTS

PE 1993

UNDERWAY

ROW NONE

$

0

CONST 1995

$ 2220

FED SHARE: $ 199B

GA. SHARE $

222

0TH SHARE $

PE 1994

$

20

ROW 1995

$

10

CONST 1996

$

233

FED.SHARE$

210

GA, SHARE$

23

0TH SHARE$

PE 1996 ROW NONE CONST

'

10

'AFTEFI. 907

PS MW CONST

$

184

AFTER 97

AFTER 97

PE 1993
ROW 1996 CONST

UNDERWAY $ 1954 AFTER 97

PE 1996
ROW CONS'l'

$

204

AFTEFI. 97

AFTER 97

PS ROW CONST

'

0

AFTER 97

AFTER 97

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 2

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

-P--. I-.-N-O--. ---------------P-R-O--JE-C-T--D-A-T-A------------------------------------------

.--

COMMENTS

YEAR

ESTS

~----. -------------------------------------------

BARTOW SR 3/US 41@ MOCKING BIRD DRIVE/CENTER RI;> IN CARTERSVILLE

PE NONE $

0

631400. INTERSECTION IMPROVEMENT / SAFETY

':-::.

.

CONG DIST. 7

ROW LOCL

PROJECT MILEAGE :. . 36 - EXIST. LANES: 4 (:~:~9.POSED LANES: 6

CONST 1995

$

577

MANAGER: BILL MCVEY

FUND SOURCE: HWY. SAFETY

FED SHARE $

519

STATUS:

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

58

0TH SHARE $

BARTOW 631402
STATUS:

SR 3/US 41 FROM POSTELLE ST/CS ]~~f~'g}fu.K IN CART'iitsVILLE

,x~~f?-~: ::;~~~c~i~~A~~~0f~~N:

0 /PROPOSED tJlliEs: 0

MANAGER: BURT RIDDLE

. )}

SEE STP-001-5 (50), PI i6~J)fQO:

CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

s

10

ROW LOCL

CONST 1996

$

565

FED SHARE $

509

GA. SHARE $

57

0TH SHARE $

BARTOW 641870
STATUS:

SR 293 @ GRASSDALE ~/fIHffs5

INTERSECTION IMPROVEMENT)J,.sAFETY

. w ww

PROJECT MILEAGE : . 2 6 - Eki:sT . LANES : 2 /PROPosi$?W.$ls : 2

MANAGER: BILL MCVEY

:,:,:,:,,,,,:.

COUNTY SGN 10-14-91 FOR ROW &: UTILITIES .:fltirnddkcT

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

BARTOW 670688
STATUS:

di 1; p INE LOG CREEK 7 . 2 MI N
BRIDGES (S). NO ADDED I.ANE~/

.
:/\boNG DIST. 7 :::;j([!f(!ii!=
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW 1995 $

70

CONST 1995

$

170

FED SHARE $

136

GA. SHARE $

34

0TH SHARE $

PE 1994

UNDERWAY

ROW LOCL

CONST 1996

$

387

FED SHARE $

310

GA. SHARE $

77

0TH SHARE $

BARTOW 670910
STATUS:

CARTERSVILLE STREETSCAPE MASTER PLAN; LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: STEVE YOST LGPA TO BE DONE BY CONTRACT

FUND sotiifoi = TRANfl. ENH.iill8it

FEDtAM/:ittGHWAY

ADMIN: P'.tiNDS

:-::-:

.

PE 1995 $

ROW NONE $

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

144
0 1106
885 29
250.

BARTOW 670990
STATUS:

COVERED BRIDGE OVER EUHARLEE CREEK NEAR CR 30 BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER: UNKNOWN DOT WILL PROVIDE THE 20% MATCH

:: 'tJJ[> sou~qtf\ifiUNs. ENHANCE. FEDE-RA,.-L.-i:i-:I:;:G;:;:::l:i::W:::::AY ADMIN

PE 1995

$

50

ROW NONE $

0

1995

$

176

FED SHARE $

141

GA. SHARE $

35

0TH SHARE $

BARTOW 6B1329
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS .FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH

- CONG DIST. "'-7
FUND SOURCE: . FEDERAL TRANSIT

OPERATING 1995

$

106

FED SHARE$

58

GA. SHARE$

0TH SHARE$

48

..

eern;im

mm=

~

~

i.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BARTOW 6B1330
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS

BARTOW 6C2329
STATUS:

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS

BARTOW 6C2330
STATUS:

ONE STANDARO,VAN TRANSIT FACILITIES/ FUNDS RECIPIENT: BARTOW MANAGER: STEVE KISH LGPA NOT APPLICABLE

..J

CONG DIST. 7
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT AOMIN FUNDS

22-Feb-1994 Page 3

FISCAL YEAR

COST ESTS

OPERATING 1996

$

110

FED SHARE $

61

GA. SHARE $

0TH SHARE $

50

CAPITAL 1995

$

32

FED SHARE $

26

GA. SHARE $

3

0TH SHARE $

3

CAPITAL 1996

$

20

FED SHARE $

16

GA. SHARE $

2

0TH SHARE $

2

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CARROLL 621770
STATUS:

CARROLLTON BYP FM 4-LN S/US 27A TO 4-LN\ON BANKHEAD/& CLVT

RECONSTRUCTION & WIDENING FROM 2 LANES 1'6: 4 LANES.

~~~ ~~~:~:r:i~il::LTON SGN 10-28-90

6TnITIES

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

CARROLL 621820
STATUS:

::g~~~ SR 61 AT SR 166 ,I~~~iy: . 00 - EXISTs::mrl; 0 /PROPOSED ~Es: 0 MANAGER: BURT RIDDLE CONTACT TRAFFIC OPERATIONS:::C:\/:=::::c=::=:,

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

CARROLL 631320
STATUS:

SR 16/US 27ALT. FM S:<t~i ~; TO W OF STRIPLING CHAP':fil5)2R 24
RECONSTRUCTION & WIDENING/FROM 2 LANES TO 4. LANES\.. . ...

PROJECT MILEAGE : 1.65

.

MANAGER: J. GARLAND

CO REFUSED ll-4-92;CITY SGN

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 4.

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1994

$

10

CONST 1995 $ 5865

FED SHARE $ 4692

GA. SHARE $ 1173

0TH SHARE $

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1996

$

231

FED SHARE $ 231

GA. SHARE $

0TH SHARE $

PE 1993 ROW 1996 CONST

UNDERWAY $ 1531 AFTER 97

CARROLL 641890
STATUS:

N CARROLLTON BYP/SR 166 CONN. FM RECONSTRUCTION & WIDENING FROM 2 PROJECT MILEAGE : 2.90 MANAGER: J. GARLAND (M) REQ CO DO UTIL 6-4-92; CARROLLTON

DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 2429 AFTER 97

CARROLL 641910
STATUS:

SR 100 NB MP 5.30-4.28; SB MP 6.9-7.89 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.01 MANAGER: BILL MCVEY (M) SEND LGPA IN 1995

CARROLL. SR 8/US 78 AT CS 777

650480 TURN LANES/ sAFETY

PROJECT MILE~GE: .23 EXIST, LANES: 2 /PROPOSED LANES: 3

MANAGER: BURT RIDDLE

STATUS: REVISED REQ VILLA RICA DO ROW & UTIL 2-17-94

OTO

CARROLL . CR 217 /PLOWSHARE RD. @ BUCK CREEK

662500 REPLACEMENT OF THE EXISTING BRIDGES (S) .. NO..ADDED .LANES ..

PROJECT MILEAGE: .00.

.

'MANAGER: BILL MCVEY

STATUS: coUNTY SGN 11/90 ROW & UTIL; CARROLLTON - NO UTIL INVOLVED

F:~::::~9.tm9t: SURFACE TR1ffiii'iB~i:
FEl.)ERAL}ltIGHWAY AD~I.~(ff~t>S.

PE 1994

UNDERWAY

ROW 1996

$

164

CONST 1997

$

882

FED SHARE $

706

GA. SHARE $

176

0TH SHARE $

iBNo souRC,w:mH. SAFETY
FEDE.-.R-:,.-A..L:--iff-o...k.#.. AY ADMIN.FUNDS

PE 1994

UNDERWAY

ROW NONE

$

0

::-:=:<tONST 1996

$

165.

FED SHARE $

149

GA. SHARE $

17

0TH SHARE $

CONG--DIST. +1

ik6GRAM ADMiN FUND souRcE: BRiodtf

FEDERAL HIGHWAY

FUNDS

PE 1992 UNDERWAY

ROW LOCI.

CONST 1995

$

339

FED SHARE$

271

GA. SHARE$

68

0TH SHARE$

ammm!

ll!!ffl!!lffl ~ ~ r::rnm

,,

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CATOOSA 610720
STATUS:

I-75: REPLACEMENT OF WELCOME CENTER REST AREA/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: J. GARLAND (C) DEPT I&T SGN CT FOR PE, CST 6-23-93;

RINGGOLD 0

CHATTANOOGA TIP f 3 CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

CATOOSA 610730
STATUS:

I-75@ SR 3/US 41 INTERCHANGE/ RECST. OR PROJECT MILEAGE : .00 MANAGER: GENS POWELL REQ CATOOSA COUNTY DO

CHATTANOOGA TIP t 10
CONG DIST. 9 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 5

FISCAL YEAR

COST ESTS

PE 1991 UNDERWAY

ROW 1994

$

672

CONST 1995 $ 4080

FED SHARE$ 3672

GA. SHARE$

592

0TH SHARE$ 1000

PE 1992 ROW 1996 CONST

UNDERWAY ' $ 6000 AFTER 97

CATOOSA 610800
STATUS:

RI -E7C5ONFSMTRSURCT2IO TNO &SR Tn,~~r.FJ')~;~.~~~
PROJECT MILEAGE : 3.63
MANAGER: RAY METTS (M) SEND LGPA IN 1995

CHATTANOOGA TIP f 14 CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST

UNDERWAY $ 1000 AFTER 97

CATOOSA 610810
STATUS:

I-75 FM SR 146 TO TENNESSEE STATE LINE RECONSTRUCTION & WIDENING FROM 6 LANES PROJECT MILEAGE : 1.42 MANAGER: RAY METTS (M) SEND LGPA IN 1995

~n~ii~~uu~= TIP f 13
9
FUND SOURCE: NAT'L HIGHWAY _E;EDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1996 CONST.

UNDERWAY

$

500

AFTER 97

CATOOSA 610820
STATUS:

CD SYSTEM FM $/SCROGGS RD TO.TENNESSEE STATE CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE: .50 MANAGER: RAY METTS (M) SEND LGPA IN 1995

\~~:~T:~~liTIP t 12
FFEUQN!li;k::A::ii&J:iwiiGeHkW: ANYATA'.LDMHiImG:FHtmw.Dst:::

PE 1993 ROW 1996 CONST

UNDERWAY

$

107

AFTER 97

CATOOSA 621530
STATUS:

SR 151 FM RELOC. HACKETT RD/CR 179 N TO I-75@ RINGGOLD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.30 MANAGER: M GANNAWAY (M) SEND LGPA WHEN PROJECT IS ADDED TO CWP

PE 1992 ROW 1997
;{fu~ souRciif JBfu.AcE TRANSPciWif}\{ : toNST FEDERAL HfGHfiiAY ADMIN FUNDS ( : /: 62Y530 fa hlf ASSOCIATED PROJECT( :'::

UNDERWAY

$

200

AFTER 97

CATOOSA 631190
STATUS:

CR 382/0LD SR 2@ SOUTH CHICKAMAUGA CRK REHABILITATION OF THE EXISTING BRIDGE(S). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER: BILL MCVEY REQ CITY DO ROW & UTIL 5-8-91; COUNTY SGN 5-10-91 PUBLIC UTL

CHATTAN~aaA TIP. 8 CONG DIST. \9
FUND souRcE: BRrodfAi'~&~RAM FEDERAL HIGHWAY ADMIN.FUNDS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995

$

303

FED SHARE$

242

GA. SHARE$

61

0TH SHARE$

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 6

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.N--O--. ---------------P-R-O-J-.E-C-T--D-A-T-A----------------------------------------------C-O-M-M--E-N-TS-.---------------------------Y-EA-R---------E-S-T-S--

CATOOSA SR2/SR 3/US 41 AT SPARKS STREET IN RING<;QLD

PE NONE

$

0

631420 TURN LANES / SAFETY

::.:.,.

PROJECT MILEAGE : .oo - EXIST. LANES: 0 l#R<>POSED LANES: 0

CONG DIST. 9

ROW 1995

$

10

CONST 1996

$

173

MANAGER: BILL MCVEY {M)

FUND SOURCE: UNKNOWN

FED SHARE $' 173

STATUS: CONTACT TRAFFIC OPERATIONS

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

CATOOSA 641820
STATUS:

CHATTANOOGA TIP i 6
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY.

ROW 1994

UNDERWAY

CONST 1995

$

741

FED.SHARE $

593

GA. SHARE $

148

0TH SHARE $_

CATOOSA 650430
STATUS:

SR 3/US 41 FM SR 146 TQ(fJ;\NNESSEE STATE LINE

RECONSTRUCTION & WIDENING.=\E'ROM 2 LANES TO 4

PROJECT MILEAGE : .66 MANAGER: M GANNAWAY (M)

=\ \c.

REQ CATOOSA COUNTY DO UTILITiitS

CHATTANOOGA TIP t 11
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY

$

165

AFTER 97

CATOOSA 650440
STATUS:

SR 146/CLOUD SPRINGS RD FM LAKEVIEW DR RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : 2.34 MANAGER: M GANNAWAY (M) REQ CATOOSA DO UTILITIES 3-2-92

'\::::::::::i~!~T:~~~\TIP t 15
,:
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS i6.Sf44Q,(ts AN ASSOCIATED PROJECT.

PE 1992 ROW 1996 CONST

UNDERWAY $ 1167 AFTER 97

CATOOSA SR 146 AT CROSS STREET

CHATTANooJii/rrp t 22

o:u:c= 650500 . SIGNALS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES:

?::coNG Disik 4

MANAGER: BURT RIDDLE

STATUS: CONTACT TRAFFIC OPERATIONS

PE NONE $

0

ROW NONE $

0

CONST 1996 $

64

FED SHARE$

51

GA. SHARE$

13

0TH SHARE$

CATOOSA SR 146/CLOUD SPGS RD FM LAKEVIEW TO I-75&BRIDGE .. SEE 650440 65Y440 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.34 MANAGER: M GANNAWAY STATUS:

J)#S'

PE 1992

ROW 1996

.FUND

souR~i;:rn&fu.AcE

CC:::,:)){:CONST TRANSPOR'fw

FEOERAL ,.i:t.fCiiWAY ADMIN FUNDS :///:/
650-240:=s' Jill- AssocrATED PR<>Jit-tl

UNDERWAY $ 544 AFTER 97

CATOOSA 6Bl334.
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS fUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH

CONG DIST. \c9
FUND SOURCE: RURA.t:ffuili~IT FEDERAL TRANSIT AOMIN FUNDS

OPERATING 1995 $

92

FED SHARE$

49

GA. SHARE$

0TH SHARE$, 43

.

~

~

~

~

~

i_

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CATOOSA 6B1335
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CATOOSA 6C2334
STATUS:

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: CATOOSA MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

CATOOSA 6C2335
STATUS:

ONE CONVERSION VAN TRANSIT FACILITIES/ FUNDS RECIPIENT: CATOOSA
MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 7

FISCAL YEAR

COST ESTS

OPERATING 1996 $

96

FED SHARE$

51

GA. SHARE $

0TH SHARE$

45

CAPITAL 1995

$

29

FED SHARE$

23

GA. SHARE$

3

0TH SHARE$

3

CAPITAL 1996

$

32

FED SHARE$

26

GA. SHARE$

3

0TH SHARE$

3

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CHATTOOG CR 1 NE OF TRION@ CHAPPEL CRK 670720 REPLACEMENT OF THE EXISTING BRIDGES(S).
PROJECT MILEAGE : .00 MANAGER: BILL MCVEY STATUS: -CHATTOOGA SGN 5-10-91 FOR ROW,

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CHATTOOG CR 170/PENN BRIDGE RD OVER

670750 REPLACEMENT OF THE EXISTING-~-~~~~~-

PROJECT MILEAGE : .00

MANAGER: BILL MCVEY

STATUS:

CHATTOOGA SGN 4-7-92

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 8

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW LOCL

CONST 1995 $ 180

FED SHARE$ 144

GA. SHARE$

36

0TH SHARE$

PE 1993 UNDERWAY

ROW LOCL

CONST 1995 $ 1079

FED SHARE$ 863

GA. SHARE $

216

0TH SHARE$

.

/&&.,'@I

~

~

c;:-!!~. .~. ,.~W

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

CHEROKEE I-75@ SR 92 610740 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. MANAGER: RAY METTS (M) STATUS: SEND LGPA IN 1996

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997

COMMENTS

ATLANTA TIP i CH/R 108

CONG DIST. 6

.

FUND SOURCE: NAT'LHIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 9

FISCAL YEAR

COST ESTS

PE 1992 ROW 1997 CONST

UNDERWAY $ 2495 AFTER 97

CHEROKEE I-575 SB ON RAMP FROM CR
610970 TURN LANES/ SAFETY PROJECT MILEAGE : .20 MANAGER: GENE POWELL
STATUS: CONTACT TRAFFIC
CHEROKEE SR 92 FM woobsTOCK 620920 RECONSTRUCTION &
PROJECT MILEAGE : 4.75 MANAGER: RAY METTS (M) STATUS: CHEROKEE COUNTY SGN FOR

ATLANTA TIP i CH 24
CONG DIST. 6 0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP i CH 3
CONG DIST. 6
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

0

ROW NONE

$

0

CONST 1995

$

121

FED SHARE$

121

GA. SHARE$

0TH SHARE$

PE 1995ROW CONST

$ 150 AFTER 97 AFTER 97

CHEROKEE SR 92 FM I-75 TO WOODSTOCK RD 620940 RECONSTRUCTION & WIDENING FROM
PROJECT MILEAGE : 3.59 MANAGER: RAY METTS (M)
STATUS: CHEROKEE COUNTY SIGNED FOR UTILITIES 11-4191,,(lt? )

,:: :::::::::::[~~~~S;~P i CH 4
6
-::FUND SOURCE: NAT'L HIGHWAY _FEDERAL HIGHWAY ADMIN FUNDS
: ::::::::::::::;:;:::::;::_.::==:.:. :-:->::;:::

CHEROKEE SR 92 FM E 0~ SR 754 TO OLD MOUNTAIN PARK RD/C~:~ 621200 RECONSTRUCTIQN & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 6.10
STATUS: ~!G!R~I~\~!T~iIL 4/92;CHEROKEE REFUSED. DOT PAY Pv-r{,61%:.

)t~;~~~s~~!!~:i cH 20

FUND)soWJ't: NAT'L HIGHV'i'Af /

FED!ciu(ti:itiGHWAY

iiliMrn:'itiNifa

-:-:,

:-.-:-:-:;;:

CHEROKEE .SR 92 FM CHEROKEE TRAIL TO CANTON HWY/SR 754 621390 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES.
PROJECT MILEAGE : 1.10 MANAGER: GENE POWELL (M) STATUS: CO SGN 1/90 PUB UTL/WOODSTOCK SGN 12/90 UTIL. SEE 1620920

t:::I!:~G~~~s;~p 6! =~~
FtiND souRci:ftkkf~L HIGHWAY
FEDERAL. itfc;a,wJi.y ADM IN

PE 1995 _ROW.
CONST

$

150

AFTER 97

AFTER 97

PE 1992 UNDERWAY

ROW 1994

UNDERWAY

CONST 1996

$ 8975

FED SHARE $ 7180

GA. SHARE $ 1778

0TH SHARE $

17

PE 1992
ROW 1996 ::::::\(CONST

UNDERWAY $ 3712 AFTER 97

CHEROKEE CANTON HWY FM PALM RD/CR 351 TON/SIXES RD [INCL RR BR] 630673 REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 3 LANES.
PROJECT MILEAGE : .37 MANAGER: BILL MCVEY STATUS: CHEROKEE COUNTY SIGNED 9-23-91 FOR ROW AND UTILITIES.

h ATLANTA

i CH2

CONG DIST.:;::.6

'FUND souRcE: BRID&i:woGRAM
FEDERAL HIGHWAY ADMbf FUNDS
63Y673 IS AN Ass6j;11,TED PROJECT.

PE 1994

UNDERWAY

ROW LOCL

CONST 1996

$

500

FED SHARE$

400

GA. SHARE$

100

0TH SHARE$

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CHEROKEE CR 770/BELLS FERRY RD NEW PARALLEL BR @\LITTLE RIVER 630975 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE : .00 MANAGER: B FERGUSON STATUS: REQ CO DO ROW & UTIL 5-7-91 (INCLUDED,.J:J{[li[~;~~:Q}7:7)

ATLANTA TIP i CH.18
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

STATUS:

ATLANTA TIP. i CH 19 CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

CHEROKEE SR 140/CANTON-ROSWE~i\ful?J\:T CR 297/EARNEY RD & CRifi/MTN RD 631390
::~~~~c~i~~A!~P~O~~~Ti~i~~E~iNEs: 2 /PROPo~t#fflis: 4
MANAGER: BILL MCVEY STATUS: COUNTY SGN 11-23-92 FOR

ATLANTA TIP i CH 25
CONG DIST. 6
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS'

CHEROKEE CANTON HWY FM PALM TO SIXES - FOR 63Y673 BRIDGES/ REPLACEMENT
PROJECT MILEAGE: .00 MANAGER: BILL MCVEY STATUS: CHEROKEE SIGNED 6-1-82

2
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
6.36673 ts AN ASSOCIATED PROJECT.

CHEROKEE HISTORIC TRAIN DEPOT RESTORATION IN HOLLY
fo]\::t 670840 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES:' MANAGER: STEVE YOST STATUS: TO BE DONE BY CONTRACT

c: .~~~~~~i;~~~i& 22
s FUNoJidiffi:Bf = TRANS.. ENHANcs> HIGHWAY (

CHEROKEE HISTORIC DEPOT RESTORATION IN WOODSTOCK & SIDEWALKS 670850 MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STEVE YOST STATUS: TO BE.DONE BY CONTRACT

.,.1: :~i~~~si~p6.!i:sf:1:~~:
FUND souRcil%iANs. ENHANCE
FEDERAL -HfGlit'i'.ifr ADMIN

CHEROKEE CR 362/MILL CREEK ROAD@ MILL CREEK 2 MI NE OF WOODSTOCK 670950 REPLACEMENT OF THE EXISTING BRIOGES(S). NO ADDED LANES.
PROJECT MILEAGE : .20 . MANAGER: BILL MCVEY STATUS:' SEND LGPA IN 1995

FUND SOURCE: FEDERAL HIGHWAY

22-Feb-1994 Page 10

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW LOCL

CONST 1996

$ 5526

FED SHARE $ 4421

GA. SHARE $ 1105

.OTH SHARE $

PE 1993

UNDERWAY

ROW LOCL

CONST 1996

$

690

FED SHARE $

552

GA. SHARE $

138

0TH SHARE $

PE NONE

$

0

ROW 1995

$

275

CONST 1995

$

418

FED SHARE $

376

GA. SHARE $

42

0TH SHARE $

PE 1994

UNDERWAY

ROW 1985

UNDERWAY

CONST 1996

$

321

FED SHARE $

257

GA. SHARE $

64

0TH SHARE $

PE LOCL

ROW LOCL

CONST_l996

$

175

FED SHARE $

140

GA. SHARE $

0TH SHARE $

35

PE LOCL

ROW LOCL

1995

$

125

FED SHARE $ 100

GA. SHARE $

0TH SHARE $

25

PE .1995 . . $

10

ROW LOCL

CONST 1997

$

428

FED SHARE$

342

GA. SHARE$

86

0TH SHARE$

~ !!!'!!!!I

~ =m

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 11

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------ ----------------------------------------------------------------------------------------------------------------

CHEROKEE COUNTY OPERATED PUBLIC TRANSIT SERVICE

6Bl339 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9 & 6

FUNDS RECIPIENT: CHEROKEE

OPERATING 1995

$

87

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE $

51

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

36

CHEROKEE COUNTY OPERATED PUBLIC TRANSIT 6Bl340 TRANSIT FACILITIES/
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH STATUS:

CONG DIST. 9 & 6

OPERATING 1996 $

90

FUND SOURCE: RURAL TRANSIT

FED SHARE $

53

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

37

CHEROKEE TWO CONVERSION VANS 6C2339 TRANSIT FACILITIES/
FUNDS RECIPIENT: CHJgR()KE:E'{ MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

CONG DIST. 9 & 6

CAPITAL 1995

$

57

FUND SOURCE: RURAL TRANSIT

FED SHARE $

46

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

5

0TH SHARE $

6

CHEROKEE ONE MINIBUS 6C2340 TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: CHEROKEE MANAGER: STEVE KISH STATUS: LGPA NOT APPLICABLE

DIST. 9 & 6

CAPITAL 1996

$

42

SOURCE: RURAL TRANSIT

FED SHARE:$

34

TRANSIT ADMIN FUNDS

GA. SHARE$

4

0TH SHARE$

4

CHEROKEE ELDERLY AND bISABLED VEHICLES AND EQUIPMENT

6Vl014 TRANSIT PROJECTS/ CAPITAL

.FUNDS RECIPIENT: AGENCIES IN CHEROKEE COUNTY

16

MANAGER: STEVE KISH

13

STATUS:

1

2

CHEROKEE ELDERLY AND DISABLED VEHICLES AND EQUIPMENT 6Vl015 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: CHEROKEE COUNTY MANAGER: STEVE KISH
STATUS:

9,,:Jt:~l:}>>
FUND SOURC,f\EitbERLY &
FEDERALTfilili ......;. sfT ADMIN

1996

$

16

FED SHARE$

13

GA. SHARE$

1

0TH SHARE$

2

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
P,ROJECT LISTING BY, COUNTY FY 1995/FY 1997
COMMENTS

COBB 62120X
STATUS:

SR 92 FM E OF SR 754 TO OLD MOUNTAIN RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : .00 MANAGER: RAY METTS COUNTY SIGNED 7/30/87 FOR UTILITIES

ATLANTA TIP f CH 20
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY .ADMIN FUNDS 621200 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 12

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1994

UNDERWAY

CONST 1996

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

. ..

~

l!l!!!!!ffl

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DADE 610940
STATUS:

I-24 1 RESURFACE & GUARDRAIL FM TENN SL GUARDRAIL/ MAINTENANCE
PROJECT MILEAGE : 4.60 - EXIST. LANES: MANAGER: RAY METTS
NOT APPLICABLE

STATE LINE LANES: 4

CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

DADE 610990
STATUS:

I-24/I-59 INTERCHANGE - THREE BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: M GANNAWAY SEND LGPA IN 1996

CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 13

FISCAL YEAR

COST ESTS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
2300 2070
230

PE 1995 ROW NONE CONST

$

20

$

0

AFTER 97

DADE 621230
STATUS:

SR 136/TRENTON FM CR RECONSTRUCTION & WIDENING/FROM PROJECT MILEAGE : 1.00 MANAGER: M GANNAWAY DADE SGN 12-18-92 & TRENTON

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62Y230 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW 1996

$

410

CONST 1997 $ 2617

FED SHARE $ 2094

GA. SHARE $

523

0TH SHARE $

DADE 62Y230
STATUS:

SR 136 FM CR 52 TO SR 58; RECONSTRUCTION & WIDENING
PROJECT MILEAGE : .00 MANAGER: M GANNAWAY

PE NONE $

0

DIST. 9

ROW 1996

$

100

CONST 1997

$

500

FUND SOURCE: I-STATE MAINT.

FED SHARE$

450

FEDERAL HIGHWAY ADMIN FUNDS
:62f236 :IS AN ASSOCIATED PROJECT.

GA. SHARE$

50

0TH SHARE$

DADE 630915
STATUS:

SR 136 E/TRENTON EB 6.4-7.2/EB ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.05 MANAGER: BILL MCVEY DADE SGN 10-15-91 - UTIL; TRENTON SGN 10-ll-9r PUB UTIL:{:C::/::Oi

)~QNG or~';'):\~\
F~:i:~~#ilf: SURFACE T~i\6tW: FEDERAL HIGHWAY Al:>iuN.:FtiNoS

PE 1992

UNDERWAY

ROW 1995

$

147

CONST 1996 $ 1613

FED SHARE $ 1290

GA. SHARE $

323

0TH SHARE $

DADE 6Bl344
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE KISH

}\\fQNG DIST. 9 : j)j],})
FUND SOURdN:ktifuu. TRANSIT FEDERAL .T~SiT ADMIN

Pl!'J!!~TING 1995 $

23

FED SHARE$

14

GA. SHARE$

0TH SHARE$

9

DADE 681345
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DADE MANAGER: STEVE KISH

CONG DIS;'?\9

OPERATING 1996 $

25

FUND SOURCE: RURAt:::fffl~IT
FEDERAL TRANSIT AOM:tN FUNDS

FED SHARE$

15

GA. SHARE$

0TH SHARE$

10

COUNT.Y P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/F)' 1997
COMMENTS

FANNIN 630875
STATUS:

SR 60@ HEMPTOWN CRK/MINERAL BLUFF; @ YOUNG STONE CRK

REPLACEMENT OF THE EXISTING BRIDGES{$). NO ADDED LANES.

PROJECT MILEAGE : .36

MANAGER: BILL MCVEY

COUNTY & MINERAL BLUFF REFUSED 8/9l;D9't.

::i?AY 3-10-93

FANNIN 63Y875
STATUS:

etillt1 SR 60 @ REMMOWN CRK - FOR sTP

~:~~~ JJw.b: oo - o ~I~:~~~wi:

E X I s T f : ~ f .:.. - i ;

/PROPOSED

o

MANAGER: UNKNOWN

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS. 63Y875 IS AN ASSOCIATED PROJECT.
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 630875 IS AN ASSOCIATED PROJECT.

_22-Feb-1994 P,age 14

FISCAL YEAR

COST ESTS

PE 1988 UNDERWAY

ROW 1989

UNDERWAY

CONST_ 1995

$

611

FED SHARE $

489

GA. SHARE $

122

0TH SHARE $

PE 1988 UNDERWAY

ROW NONE

$

0

CONST 1995

$

209

FED SHARE $

167

GA. SHARE $

42

0TH SHARE $

FANNIN 670930
STATUS:

RESTORE MINERAL BLUFF:B!!!Mh
MI-SCELLANEOUS IMPROVEMENTS,/ ENHANCEMENT
PROJECT MILEAGE : oo - ixl$.,T. LANES: o /PROP01itiji:.mfs: o
MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT

CONG DIST. 9
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW NONE

$

0

CONST 1996

$. 128

FED SHARE$. 102

GA. SHARE$

0TH SHARE$

26

FANNIN 6B1_349
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH

DIST .9

OPERATING.1995

$

79

FOND SOURCE: RURAL ~RANSIT

FED sHARE $

46

.F-.E.D--.-E-B:;:.;:A:L TRANSIT-ADMIN FUNDS

GA. SHARE$

0TH SHARE$

33

FANNIN 6B1350.
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: FANNIN MANAGER: STEVE KISH

1996 $

02

FED SHARE$

48

GA. SHARE$

0TH SHARE$

34,

!$'ES!

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT. STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FLOYD 620590
STATUS:

SR 1/US 27 IN ROME FM 5TH AVE TO RECONSTRUCTION & WIDENING FROM PROJECT MILEAGE : .20 MANAGER: BFERGUSON FLOYD REFUSED ll-2-93;ROME SGN

ROME TIP f L-85-11
CONG DIST. 7 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 15

FISCAL YEAR

COST ESTS

PE 1994 ROW 1996 CONST

UNDERWAY

$

360

AFTER 97

FLOYD 621075
STATUS:

US 27@ ARMUCHEE & LITTLE REHAB. OF THE EXISTING ~~-~v=u PROJECT MILEAGE : .06 MANAGER: RAY METTS DOT TO PAY PER CHARLES

ROME TIP f L-89-8
CONG DIST. 7 GRIP PROJECT FUND SOURCE: BRIDGE PROGRAM
FEDERAL HIGHWAY ADMIN FUNDS 621070 IS AN ASSOCIATED PROJECT.

PE 1992 UNDERWAY

ROW NONE

$

0

CONST 1995

$

725

FED SHARE $

580

GA. SHARE $

145

0TH SHARE $

FLOYD 621450
STATUS:

W ROME BP FM CR 638 CONSTRUCTION OF NEW PROJECT MILEAGE : 1.50 MANAGER: M GANNAWAY DOT TO FUND ROW & UTILITIES

ROME TIP f L-89-10 CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

CONST 1995 $ 3952

FED SHARE$ 3162

GA. SHARE$

790

0TH SHARE.$

FLOYD 621560
STATUS:

SR 53 FM MP 0.54 TO 14.15 [ BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: BILL MCVEY (M) FLOYD REFUSED 1-19-94; CAVE

DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FE,DERAL HIGHWAY ADMIN FUNDS

PE 1992

UNDERWAY

ROW 1996

$

44

CONST 1997

$ 1111

FED SHARE $

889

GA. SHARE $

222

0TH SHARE $

FLOYD 621690
STATUS:

SR 101 FM CR 740/CS 899 NORTH TO RECONSTRUCTION & WIDENING FROM 2 PROJECT MILEAGE : 1.84 MANAGER: J. GARLAND (M) SEND LGPA IN 1996

ROME \}CONG
Fmi;::1Btfil8: SURFACE Truiliffii6~f'.
FEDJ1:ttA:L,.iftGHWAY ADMIN\FUNDS '

PE 1994 ROW 1997 CONST

UNDERWAY $ 1150 AFTER 97

FLOYD 650410
STATUS:

DIVISION ST/ROME FM SHORTER AVE TO REDMOND RD/& REMOVE RR BR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.04 MANAGER: J. GARLAND ROME SGN 4-15-91 ROW/UTIL EXCPT RR;CO SGN 4-23-91 ROW & UTIL

,{:::it~ TIP f

PE 1993 UNDERWAY

:::,::::::\CONG DIST.

ROW LOCL

iUND .,.,.,.,-::,:-:,:/tONST 1996 $

SOURciit:rnm&AcE TRANSPok4:J

FED SHARE $

1619 1295

FEDERAL ,,Jffi;ii(iiAy ADMIN

GA. SHARE $

324

0TH SHARE$

FLOYD 650460
STATUS:

SR 101 OVER ETOWAH RIVER IN ROME REHAB. OF THE EXISTING BRIDGE(S). FROM 4 LANES TO 5 LANES. PROJECT MILEAGE : .00 MANAGER: D. SMITH (M) SEND LGPA IN 1995

ROME TI/>t. L-89-4 CONG. DIST. :7
FUND SOURCE: BRIQ~~}~:iih~RAM FEDERAL HIGHWAY ))~IN FUNDS

PE 1993 ROW 1996 CONST

UNDERWAY

$

405

AFTER 97

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 16

PROJECT LISTING BY COUNTY FY 1995/FY 1997

.COUNTY

DESCRIPTION

FISCAL

COST

F-L-PO-.YI-.-DN--O-.--M-A. Y-O-'S--B-A-R--L-O--CK-PR-A-ON-JED-C-TD-A-MD-A-TR-A-ES-T-O-R-A--T-IO-N--O-N----------------------------R-O-M-E.--T-CIPO-M--iM-E-6N-7T-S0-8-2-0-----------------------PEY--EA-LOR--C-L------E-ST--S--

670820 MISCELLANEOUS IMPROVEMENTS/

CONGDIST. 7

ROW LOCL

PROJECT MILEAGE : .00 - EXIST. LANES: 0

0

CONST 1995

$ 1450

MANAGER: MEG BRYSON

FUND SOURCE: TRANS. ENHANCE.

FED SHARE$ 1160

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE- $ ' 710

0TH SHARE$ 1000

FLOYD 670830
STATUS:

CLASS I BIKEWAY IN ROME BICYCLE/PED. FACILITY/ PROJECT MILEAGE : .00 MANAGER: MEG BRYSON TO BE DONE BY CONTRACT

ROME TIP f 670830
CONG DIST. 7
0 . FUND SOURCE: TRANS. ENHANCE.
FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996

$

465

FED SHARE $

372

GA. SHARE $

0TH SHARE $

93

FLOYD 6D6011
STATUS:

5 .TRANSIT BUSES, VAN,
TRANSIT PROJECTS/ FUNDS RECIPIENT: ROME MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 7

CAPITAL 1995

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS.

GA. SHARE$

0TH SHARE$

1116 8.93 112 112

FLOYD 6D6012
STATUS:

5 TRANSIT COACHES, TOW TRUCK, TRANSIT PROJt:CTS / CAPITAL FUNDS RECIPIENT:ROME TRANSIT SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE

FLOYD 6D6014
STATUS:

-
PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE

CAPITAL 1996

$

URBAN TRANSIT DISC.

FED SHARE$

ADM IN FUNDS .

GA. SHARE$

0TH SHARE$

1149 919 115 115

URBAN TRANS!i_ti()
ADMIN ftiNDif

1995

$

SHARE$

SHARE$

SHARE$

1184 213 213
1184

FLOYD 6D6015
STATUS:

PUBLIC TRANSIT SERVICE FOR CITY OF ROME TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: ROME TRANSIT SYSTEM MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 7
il~ FUND sou~9#\!\!l1 TRANSIT
FEDERAL!l'MNS!T ADMIN

:_OPERATING 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

1254
213 213 1254

FLOYD ELDERLY AND DISABLED VEHICLES AND EQUI~MENT 6Vl01l TRANSIT PROJECTS / CAPITAL-
- FUNDS RECIPIENT: AGENCIES IN .FLOYD MPO AREA
MANAGER: STEVE KISH
STATUS:

:,
. CONG DIST. :7

1995

$

24

ADMiN FUND SOURCE: ELDEfil'.f)f/~ISABLED ~~~TAL FED SHARE$

. FEDERAL TRANSIT

FUNDS

GA. SHARE$

19 3

0TH SHARE$

2

I>



~

lt~w.:~J

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 17

FISCAL YEAR

COST ESTS

FLOYD 6V1012
STATUS:

ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FLOYD MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1996

$

25

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

20

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

3

0TH SHARE$

3

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GILMER 621270
STATUS:

SR 282 EB FM MP 1.7 TO 3.4; ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.45 MANAGER: BILL MCVEY REQ GILMER DO UTILITIES 12-6-89.

9.95

CONG DIST. 9
FOND SOURCE: SURFACE TRANSPORT . FEDERAL HIGHWAY ADMIN FONDS

GILMER 631080
STATUS:

SR 52 LEFT TORN LANE@ SR 2 TORN LANES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: BILL MCVEY GILMER COUNTY SIGNED

UTILITIES.

CONG DIST. 9
4 FOND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FONDS 631090 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 18

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1994 UNDERWAY

CONST 1995

$ 1511

FED SHARE $ 1209

GA. SHARE $

302

0TH SHARE $
"

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

87

FED SHARE $

78

GA. SHARE $

9

0TH SHARE $

GILMER 631090
STATUS:

SR 2@ CARTECAY REHAB. OF THE EXISTING PROJECT MILEAGE : .13 MANAGER: BILL MCVEY GILMER COUNTY SIGNED

CONG DIST. 9
FOND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS 631080 IS AN ASSOCIATED PROJECT.

PE 1992

UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$

473

FED SHARE $

378

GA. SHARE $

95

0TH SHARE $

GILMER 631100
STATUS:

SR 282/ELLIJAY FM WEST OF SR 5 RECONSTRUCTION & WIDENING FROM PROJECT MILEAGE : 1.30 MANAGER: J. GRAYBEAL (C) ELLIJAY SGN 8-24-92. DOT WILL PAY GILMER

GILMER 631110
STATUS:

SR 52 EB FM MP 16.0-17.8; WB MP 18.8-20.17 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.17 MANAGER: BILL MCVEY REQ GILMER DO UTILITIES 7-30-91.

GILMER 631430
STATUS:

SR 2/SR 52@ MOONTAINTOWN CREEK 6.7 MI NW OF ELLIJAY REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .23 MANAGER: BILL MCVEY REQ GILMER COUNTY DO UTILITIES 10-6-93

DIST. 9
SOURCE: SURFACE TRANSPORT. HIGHWAY ADMIN FONDS
m:::o,]\
FONo:!BfAfdk: SURFACE T~J:tsl4': FEDEi.RAiUb:GHWAY A.DMINc::tiliios
wJ!!1::... ,
'\it&J~ SOORciJ :11~~:E FED~~ #l$i(OVAY

PE 1992

UNDERWAY

ROW 1994

$ 1620

CONST 1996

$ 2898

FED SHARE $ 2318

GA. SHARE $

580

0TH SHARE $

PE 1992

UNDERWAY

ROW 1995

$

210

CONST 1997

$ 1296

FED SHARE $ 1037

GA. SHARE $

259

0TH SHARE $

PE 1994

UNDERWAY

ROW 1995

$

10

1997

$

571,

FED SHARE $

457

GA. SHARE $

114

0TH SHARE $

GILMER 681354
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRAN.SIT FACILITIES / OPERATIONS FONDS RECIPIENT: GILMER MANAGER: STEVE KISH

CONG DIST. \9
FOND SOURCE: FEDERAL

OPERATING 1995

$

62

FED SHARE$

36

GA. SHARE$

0TH SHARE$

26

...

=ml

~

~

t.

\fl,.w,;:j

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 19

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

--------------------------------------------------------------------------------------------' ---------------' ------------------------

GILMER COUNTY OPERATED PUBLIC TRANSIT SERVICE

6B1355 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: GILMER

OPERATING 1996 $

64

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

37

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

27

COUNTY P. I.NO.
GORDON 610550
STATUS:

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

GORDON 610750
STATUS:

I-75 @ SR 156 IN CALHOUN

.c



INTERCHANGE / REC ST. OR REHAB ./{\,:::::c::,::

\/:'\.

PROJECT MILEAGE : . 30 - EXIST2 ,tANi!!S: 3 /PROPOSED IJili1iJS: 5
~A~~~O~NG~N~~~i'. 10-26f9i] &8b~N SGN PUB UTIL 2+;lj}94

CONG DIST. 9
FUND soURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

GORDON 610755
STATUS:

I-75 @ sR 225 N OF c.JJii8&iJ'/

INTERCHANGE / RECST. OR'REHAB.

/ : .: . :

PROJECT MILEAGE : .oo - EXIST. LANES: 6 /PROPosiri:t..@fs: 6

~~BKib' ~A~~~o:yD~E;~!Lic UTIL 'ia~fa6,,!l?; couw~r

CONG DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

GORDON 610930
STATUS:

:I~~~: I-75 INTERCHANGE AT SR 136

INTERCHANGE/ RECST. OR REHAB.

PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSE;Q

6

MANAGER: GENE POWELL {M)

SEND LGPA IN 1997

FUND SOURCE: I-STATE MAINT. F~Q~R.M HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 20

FISCAL YEAR

COST ESTS

PE 199.?

UNDERWAY

ROW 1996

$

120

CONST 1996

$ 2291

FED SHARE $ 2062

GA. SHARE $

229

0TH SHARE $

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1996

$ 3298

FED SHARE $ 2968

GA. SHARE $

330

0TH SHARE $

PE 1992

UNDERWAY

ROW 1995

$

249

.CONST 1996

$ 1783

FED SHARE $ 1605

GA. SHARE $

178

0TH SHARE $

PE 1996 ROW 1997 CONST.

$

16

$

10

AFTER 97

GORDON 611000
STATUS:

I-75 REST

REST AREA *35 SEWER AREA/ MAINTENANCE

LINE

& HOOK

UP

TO

SE~k

SYSTEM

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES_f: 0 )/

MANAGER: J. GARLAND

NOT APPLICABLE

<rcoNG Disi~: rn=
I-STATE MAINT> ADMIN=:i!'tiNos

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1995

$

320

FED SHARE $

288

GA. SHARE $

32

0TH SHARE $

GORDON 620780
STATUS:

SR 3/US 41 FM S OF SR 156 N TO CALHOUN BYP IN CALHOUN RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.43 MANAGER: M GANNAWAY {M) SIGNED BY CITY OF CALHOUN 3-14-84 FOR UTILITIES

PE 1992

ROW 1997

=;&J6 .::::=.=:===

.. ;.-:,::,:-:-::tONST

souRctf!MtlkPAcE TRANSPORTS :>= =

FEo~:1baiAY ADMIN

UNDERWAY $ 4594 AFTER 97

GORDON 621365
STATUS:

SR 3/US 41/CALHOUN FM S OF AIRPORT TO SR 53/INCL BR CLVT EXT RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. . PROJECT MILEAGE: 1.60 MANAGER: M GANNAWAY . {M) CALHOUN SGN DO UTIL 10-25-93;GORDON SG~ 10-21-93 UTILITIES

PE 1992 .UNDERWAY

ROW NONE

$

0

CONST 1996

$ 3693

FED SHARE $ 2954

GA. SHARE $

739

0TH SHARE $

~

l!l!!!!'!!!!!

~

~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GORDON 621510
STATUS:

SR 53@ CSX RR/FAIRMOUNT REPLACEMENT OF THE EXISTING BRIDGES{S). PROJECT MILEAGE : .00 MANAGER: BILL MCVEY REQ CO DO PUB UTIL 10-30-91;

LANES.

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

GORDON 621540
STATUS:

SR 53 waMp 14.67-15.S;EB MP ADDITION OF A PASSING LANE. PROJECT MILEAGE : 3.25 MANAGER: BILL MCVEY {M)
GORDON COUNTY SIGNED

GORDON 621545
STATUS:

SR 53@ PINE LOG REHABILITATION OF PROJECT MILEAGE : .00 MANAGER: BIL~ MCVEY {M) REQ GORDON COUNTY DO

GORDON 631290
STATUS:

SR 136 EB MP 10-11.3; WB MP ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.60 . MANAGER: BILL MCVEY (M) SEND LGPA IN 1996

UTILITITES.

CONG DIST. 9 FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 621545 IS AN ASSOCIATED PROJECT.
CONG DIST. 9 FOND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 621540 IS AN ASSOCIATED PROJECT.
DIST. 9 FUND SOURCE: SURFACE TRANSPORT. FED.ERAL HIGHWAY ADMIN FUNDS
:-:-::;;::::::::::::::.:

22-Feb-1994 Page 21

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW 1994

UNDERWAY

CONST 1995 $ 1120

FED SHARE.$

896

GA. SHARE$

224

0TH SHARE$

PE 1992

UNDERWAY

ROW 1995

$

95

CONST 1997

$ 1086

FED SHARE $

869

GA. SHARE $

217

0TH SHARE $

PE. 1992

UNDERWAY

ROW NONE

$

0

CONST 1997

$

309

FED SHARE $

247

GA. SHARE $

62

0TH SHARE $

PE 1996 ROW 1997 CONST

$

50

$

77

AFTER 97

GORDON 631370
STATUS:

SR 136 CONN, EB MP 4.5 TO MP 5.8; WB MP 6.55 ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.30
MANAGER: BILL MCVEY {M) SEND LGPA IN 1996

t:coNG DI_~ill\;'

,-:.:;::::::=:::::::-;

:.:;:;:;:-:-

FoNo:Jio~Bf = suRFAcE TR1iliJi8k4>
FEDim)aIGHWAY AOMIN':Foobs' :<.;-;.:.;,:

PE 1995 ROW 1997 CONST

$

33

$

30

AFTER 97

GORDON 650420
STATUS:

HILLHOUSE ST EXT/CALHOUN@ CSX RR-OR-HICKS ST EXT@ CSX RR BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: M GANNAWAY {M) SEND LGPA AFTER 1994 STIP IS APPROVED

'::/::::=ccoNG DIST. 9

~Wf: . ;~;; SOUR,t

SAFETY

FEDE;RAL.RXGH~AY ADMIN

PE 1996 $

16

ROW NONE $

0

:-:-::::::::,:,,:t::bNST 1996

$

522

FED SHARE$

470

GA. SHARE$

52

0TH SHARE$

GORDON 662510
STATUS:

UNION GROVE ROAD/CR 65 RELOCATION FM SR 3 TO SR 53 / CALHOUN CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 3.15 MANAGER: M GANNAWAY {M) SEND LGPA WHEN PROJECT IS ADDED TO CWP

CONG DIST .-c::9 FUND SOURCE: SURFiti!:)1fuuispoRT.
FEDERAL HIGHWAY Ju>MIN FUNDS

PE ROW LOCL CONST

$

200

AFTER 97

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 22

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

-P--. I-.-N-O-.---------------P-R-O-J-E-C-T--D-A-T-A----------------------------------------------C-O-M-M--EN-T-S---------------------------Y-E-A-R--------E-S-T-S--

GORDON CR 473/FAIRVIEW RD @ LICK CREEK

-:\._

PE 1993 UNDERWAY

670730 REPLACEMENT OF THE EXISTING BRIDGES(S). ~0. ADDED LANES.

coNG DIST. 9

ROW LOCL

PROJECT MILEAGE : . 00

------

CONST 1995 $

97

FUND SOURCE: BRIDGE PROGRAM

FED SHARE $

78

STATUS: =t~!R~G:I~~ ~;~YUTILITIEs & NECEssrutf b~f6bRs 2-3-94

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

19

GORDON 670940

~!1r 1
COOSAWATTEE RVR TRAIL WITH LANDs.ifik11 ~::::::)

VATION

:!;~~~/:~~EA;!C~L~~~ ~ ~~~:rf~~~/; 0 /PROPOSED

0

CONG DIST. 9

0TH SHARE $

PE LOCL ROW LOCL CONST 1997

$ 1250

MANAGER: JANET HARVEY

.-::} ::

FUND SOURCE: TRANS. ENHANCE.

FED SHARE $ 1000

STATUS: LGPA TO BE DONE BY CONTRAT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

0TH SHARE $

250

GORDON 6Bl359
STATUS:

COUNTY OPERATED PUBLi8\4ki&sIT SERVICE TRANSIT FACILITIES/ OPEMTIONS FUNDS RECIPIENT: GORDON MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1995

$

56

FUND SOURCE: RURAL TRANSIT

FED SHARE $

32

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

24

GORDON 6Bl360
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT -FACILITIES /OPERATIONS FUNDS RECIPIENT: 'GORDON MANAGER: STEVE KISH

DIST. 9

FUND SOURCE: RURAL TRANSIT

OPERATING 1996

$

59

FED SHARE $

34

FED-.:-E--:-R:-:-AL .TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

25

GORDON 6C2360
STATUS:

ONE CONVERSION VAN WITH LIFT TRANSIT FACILITIES/ CAPITAL FUNDS RECIPitNT: GORDON MANAGER: STEVE KISH LGPA NOT APPLICABLE

/)CONG DI~flrn
FUND_)ffej~dfu : FEDE.RA--:,::-l {:':TRAN S I T

1996

$

32

FED SHARE$

26

GA. SHARE$

3

0TH SHARE$

3

lll!!ffl!!

~

~

.. .

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HARALSON SR 120 BTWN BUCHANAN & DALLAS/PAULDING 621580 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 3.87 MANAGER: BILL MCVEY (M) STATUS: SEND LGPA IN 1997

.. 2 EB & 1 WB

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 23

FISCAL YEAR

COST ESTS

PE 1992 ROW 1997 CONST

UNDERWAY

$

243

AFTER 97

HARALSON CR 342/S-1618 FM SR 8/US

631140 MINOR WIDEN & RESURF / RECST;

PROJECT MILEAGE : 5.36 -

2

MANAGER: BILL MCVEY (M)

STATUS: REQ HARALSON DO UTIL

HARALSON SR 8 EB MP 15.8-17.3; 631170 ADDITION OF A PASSING
PROJECT MILEAGE : 2.20 MANAGER: BILL MCVEY STATUS: REVISED 1-29-92 REQ COUNTY

HARALSON SR 120, EB MP 1.36-2.82; WB 641920 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 3.32 MANAGER: BILL MCVEY (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP

HARALSON SR 1/US 27: OVER SOUTHERN RAILROAD IN 641950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: BILL MCVEY (M) STATUS: SEND IN 1996

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

DIST. 7
SOURCE: SURFACE TRANSPORT. HIGHWAY ADMIN FUNDS

Dis,1 Ii~

F~~::~6i6fu: BRIDGE P
FEDillihb:GHWAY ADMrn

RruO1:~fo~s

/

PE 1992

UNDERWAY

ROW 1995

$

296

CONST 1997

$ 2730

FED SHARE $ 2184

GA. SHARE $

546

0TH SHARE $

PE 1992

UNDERWAY

ROW 1995

$

274

CONST 1997

$ 1354

FED SHARE $ 1083

GA. SHARE $

271

0TH SHARE $

PE ROW CONST

$

64

AFTER 97

AFTER 97

PE 1995 ROW 1997 CONST

$

12

$

1

AFTER 97

HARALSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1364 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPI~NT: HARALSON MANAGER: STEVE KISH STATUS:
HARALSON COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1365 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: HARALSON MANAGER: STEVE KISH STATUS:

t:JbNG

Ftfu'; :\:/:;:::::,:,:,,::_OPERATING 1995 $

souRci.tihm TRANSIT

FED SHARE$

64 38

FED~J:Uu,. :TRANSIT ADMIN

GA. SHARE$

0TH SHARE$

26

CONG DIST. \-7

OPERATING 1996

$

67

FUND SOURCE: RURAt/t'Mffi~IT FEDERAL TRANSIT .fu5M:tif FUNDS

FED SHARE$

40

GA. SHARE$

0TH SHARE$

27

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 24

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P .I.NO.

PROJECT DATA

---------------------------------------------------------------------------

------CO-M--M-E-N-T-S---------------------------Y-E-A-R--------E-S-TS --

HARALSON ONE CONVERSION VAN WITH LIFT

6C2364- TRANSIT FACILITIES/ CAPITAL

CONG DIST. 7.

FUNDS RECIPIENT: HARALSON

CAPITAL 1995

$

32

MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE$

26

STATUS: LGPA NOT APPLICABLE

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

3

0TH SHARE$

3

<t





~

~

~

n.":'!!':~~

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

MURRAY 620399
STATUS:

SR 52 @ L&N RR REHABILITATION OF THE PROJECT MILEAGE : .17 MANAGER: BILL MCVEY NOTHING SENT

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

MURRAY 621260 .
STATUS:

SR 282 RELOCATION FM SR 61/US CONSTRUCTION OF NEW ROUTE PROJECT MILEAGE : .67 MANAGER: BILL MCVEY
MURRAY COUNTY SIGNED

UTILITIES.

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

MURRAY 621265
STATUS:

SR 282/US 76 EB FM ADDITION OF A PASSING PROJECT MILEAGE : 2.35 MANAGER: BILt MCVEY REV REQ CO DO ROW/UTIL

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

MURRAY 621731
STATUS:

SR 2/SR 61@ SUMAC CREEK REHAB. OF THE EXISTING BRIDGE(S). PROJECT MILEAGE : .00 MANAGER: J. GRAYBEAL (M) SEND LGPA IN 1996

DIST. 9
FUND SOURCE: BRIDGE PROGRAM .F:EDERA-::L-::::..-HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 25

FISCAL YEAR

COST ESTS

PE 1980 UNDERWAY

ROW 1995

$

114

CONST 1997

$

606

FED SHARE $

485

GA. SHARE $

121

0TH SHARE $

PE 1992 UNDERWAY

ROW 1995

$

51

CONST 1996

$ 2829

FED SHARE $ 2263

GA. SHARE $

566

0TH SHARE $

PE 1992 UNDERWAY

ROW 1995

$

35

CONST 1996

$ 1013

FED SHARE $

810

GA. SHARE $

203

0TH SHARE $

PE 1996 ROW 1997 CONST

$

24

$

5

AFTER 97

MURRAY 641970
STATUS:

SITTON ROAD AT SR 52 ALT. IN CHATSWORTH TURN LANES/ SAFETY PROJECT MILEAGE : 30 - EXIST. LANES: 2 /PROPOSED LANES,f\3/'}/ MANAGER: BURT RIDDLE CO SGN ROW, UTIL 7-6-93; OTO

<::::;::-:-:::.

:::::::::

FUNo)so~t: HWY. ; ~AFE:':1:t/@ ? ' '

FEDERAL HIGHWAY ADa:I:N':!;QNbS

MURRAY 670701
STATUS:

CR 23/LOUGHRIDGE RD@ MILL CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: BILL MCVEY MURRAY CO SGN ROW, UTILITIES & NECESSARY DETOURS 11-18-9.1.

iifuri <,

souMi'fi?hiHDGE PROGRAM

FEDERAL <itfdk#AY ADM IN

MURRAY 670780
STATUS:

CR 299 OVER EMERY/HOLLY CREEK BRIDGES/ REPLACEMENT PROJECT MILEAGE : . 00 MANAGER: BILL MCVEY (M) MURRAY REFUSED TO DO ROW, UTIL AND DETOURS 1-18-94

CONG DIST. \9
FUND SOURCE: FED FEDERAL HIGHWAY

PE 1994 UNDERWAY

ROW LOCL

.CONST 1995

$

275

FED SHARE $

248

GA. SHARE $

28

0TH SHARE $

PE 1993 UNDERWAY

ROW LOCL

1995

$

228

FED SHARE $

182

GA. SHARE $

46

0TH SHARE $

PE 1995

$

5

ROW LOCL

CONST 1997

$

463

FED SHARE $

463

GA. SHARE $

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 26

PROJECT LISTING BY COUNTY FY 1995/FY 1997

, COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

------------------------------------------------------------------------------------------------------

-----------Y-E-A-R---------E-ST-S---

MURRAY COUNTY OPERATED PUBLIC TRANSIT SERVICE

6Bl369 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: MURRAY

OPERATING 1995 $

70

MANAGER: STEVE KISH

FUND SOURCE: ,RURAL TRANSIT

FED SHARE$

41

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

29

MURRAY 6Bl370
STATUS:

COUNTY OPERA~ED PUBLIC TRANSIT TRANSIT FACILITIES/ FUNDS RECIPIENT: MURRAY MANAGER: STEVE KISH

CONG DIST. 9

OPERATING 1996 $

73

FUND SOURCE: RURAL TRANSIT

FED SHARE$

43

FEDERAL TRANSIT ADMIN FUNDS

GJI,. SHARE $

0TH SHARE$

30

~

~

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

PAULDING SR 61/DALLAS @ SOUTHERN RR

?:=:.

620834 REPLACEMENT OF THE EXISTING BRIDGES(S). tR.OM 2 TO 3 LANES.

PROJECT MILEAGE : .38.

MANAGER: BILL MCVEY

STATUS: SIGNED BY CITY OF DALLAS 9/30/87 FOR of:ttttfls

CONG DIST. 7
FOND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PAULDING SR 92@ LICK LOG CREEK

621020 REHAB. OF THE EXISTING

PROJECT MILEAGE : .50

MANAGER: BIL!.. MCVEY

. :)\}:=})



STATUS: SIGNED BY COUNTY 6-25-85 ......&.....::H.:I:RA.M 7-1-85 FOR OTILITI~:-f:-:a- /}:

PAULDING SR 92 @ SCL kR

-:-:-:-:-:-:-:-:-:-

:/

621022 REHAB. OF THE EXISTING BRlPGE(S). FROM 2 LANES TdisiJfuEs.

PROJECT MILEAGE : .00

MANAGER: BILL MCVEY (M)

..... .

STATUS: UNDER #621020--CITY/HIRAM SGN'

CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS
CONG DIST. 7 FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS

22-Feb-1994 Page 27

FISCAL YEAR

COST ESTS

PE 1992 UNDERWAY

ROW 1995

$ 1175

CONST 1996

$ 1308

FED SHARE $ 1046

GA. SHARE $

262

0TH SHARE $

PE 1986 UNDERWAY

ROW 1988 UNDERWAY

CONST 1995

$

554

FED SHARE $

443

GA. SHARE $

111

0TH SHARE $

PE 1993 ROW 1997 CONST

UNDERWAY

$

9

AFTER 97

PAULDING SR 120 FM SR. 6/0S 278 NE TO THE COBB CO LINE 621150 RECONSTRUCTION & WIDENING FROM 2 LANES
PROJECT MILEAGE : 4.17 MANAGER: J. GARLAND STATUS: COUNTY SIGNED TO DO UTILITIES 2-20-87
PAULDING SR 61/DALLAS FM SR 120 CONN TO SR 6/0S 278 621570 RECONSTROCTibN & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.20 MANAGER: J. GARLAND (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP

DIST. 7 FOND SOURCE: SURFACE TRANSPORT. FED::.::E:::R:::;A=L. HIGHWAY ADMIN FONDS
:::{CONG
~~::J86k@t: NAT'L HIGH#.A'.QJ/t: ii.HIGHWAY

PE 1992 UNDERWAY

ROW 1992 UNDERWAY

CONST 1997

$ 9478

FED SHARE $ 7582

GA. SHARE $ 1896

0TH SHARE $

PE ROW CONST

$

59

AFTER 97.

AFTER 97

PAULDING SR 120@ 3 LOC IN HARALSON & PAULDING co . . . SEE HARALSON 62158X ADDITION OF A PASSING LANE.
PROJECT MILEAGE : .00 MANAGER: UNKNOWN
STATUS:

' {'c~:)NG DIST.
FUND sooRci{{MH&AcE TRANSPci;Jt

PE 1992 ROW 1997 :::::=,=:=coNST

!~~~forr:tl~!!s~~!~E~o:~~dif;ff\>

UNDERWAY

$

0

AFTER 97

PAULDING SR 61 NB 15.0-16.7;NB 17.6-19.6/PAOLDING;SB 22.9-0.87/BARTOW 621680 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 5.67 MANAGER: BILL MCVEY (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP

CONG DIST .=\7

ADMIN FUND SOURCE: suRFitl\JfullispoRT.

FEDERAL HIGHWAY

FUNDS

PE ROW CONST

$

102

AFTER 97

AFTER 97

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

PAULDING SR.61 FM WIXS DR/CR 245 TO DALLAS-NEBO 621750 RECONSTRUCTION & WIDENiNG FROM 2 LANES
PROJECT MILEAGE : 1.79
MANAGER: J. GARLAND {M) STATUS: SEND LGPA WHEN PROJECT IS

CONG DIST. 7
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 28

FISCAL YEAR

.COST ESTS

PE ROW CONST

$

90

AFTER 97

AFTER 97

PAULDING SR-92 AT SR 120 CONNECTOR

641980 TURN LANES/ SAFETY

.

PROJECT MILEAGE: .00 -

MANAGER: BILL MCVEY (M)

STATUS: CONTACT TRAFFIC

PAULDING SR 61 AT SR 120 642030 INTERSECTION
PROJECT MILEAGE MANAGER: UNKNOWN STATUS: SEND LGPA IN 199

PAULDING CITY OF DALLAS HISTORICAL DISTRICT 670920 SIDEWALKS/ ENHANCEMENT
PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: STEVE YOST STATUS: LGPA TO BE DONE BY CONTRACT

PAULDING COUNTY OPERATED PUBLIC TRANSIT SERVICE' 6B1374 : TRANSIT FACILITIES / OPERATIONS
FUNDS RECIPIENT: PAULDING MANAGER: STEVE KISH STATUS:

PAULDING COUNTY OPERATED PUBLIC TRANSIT SERVICE 6B1375 TRANSIT FACILITIES/ OPERATIONS
FUNDS RECIPIENT: PAULDING MANAGER: STEVE KISH
STATUS:

CONG DIST. 7
0
FUND SOURCE: HWY. SAFETY
FEDERAL HIGHWAY ADMIN FUNDS

PE 1994': UNDERWAY.

ROW NONE

$

0

CONST 1995

$

289

FED SHARE $

260

GA. SHARE $

29

0TH SHARE $

CONG DIST. 7 4
_FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS'.
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS.....,

PE 1994

$

8

ROW 1995

$

11

CONST 1996

$

255

FED.SHARE $

230

GA: SHARE $ '.

26

0TH SHARE $'

['

PE LOCL

ROW NONE

$

0

CONST 1997

$

94

FED SHARE $

75

GA. SHARE $

0TH SHARE $

-19

}CONG Disi:

kB&khf: > FUN~<

--.OPERATING.1995. $

RURAL TRANSi4} =

FED SHARE. $

56 32

FEQJ.a:l.lA.t/T~SIT AD~rn::fo~os

GA. SHARE,$.

0TH SHARE$

24

:rr~bNG DIST. 1_
;{fu\; souRcili:tldfu
FEDERAL -TRAMSiT .

,1996. . $ _., 58 FED, SHARE $ . 33 GA. SHARE $.
0TH SHARE$

., ,.

~

~

~

r:-:m.,r,m

,............,.

COUNTY P, I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

PICKENS 621590
STATUS:

SR 53: WB MP 22.6-24,06; EB ADDITION OF A PASSING LANE. PROJECT MILEAGE : 4.40 MANAGER: BILL MCVEY (M) SEND LGPA WHEN PROJECT IS ADDED

26.48-28.42

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 29

FISCAL YEAR

COST ESTS

PE ROW CONST

$

88

AFTER 97

AFTER 97

PICKENS 621640
STATUS:

SR 53 EB MP 7.25-8.4; WB MP ADDITION OF A PASSING LANE. PROJECT MILEAGE : 2.70 MANAGER: BILL MCVEY (M) SEND LGPA IN 1995

PICKENS 621830 STATUS:

SR 53 AT SPRING INTERSECTION TM1on,"\'\n~M1~"~/ .
PROJECT MILEAGE : .00 MANAGER: BURT RIDDLE CONTACT TRAFFIC OPERATIONS

PICKENS 6B1379
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: PICKENS MANAGER: STEVE KISH

PICKENS 6B1380
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE
TRANSIT FACitITIES / OPERATIONS FUNDS RECIPIENT: PICKENS. MANAGER: STEVE KISH

CONG DIST. 9 - FUND SOURCE: NAT'L HIGHWAY
FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9
0
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW 1996 $ 278 CONST 1997 $ 1240
FED SHARE $ 992 GA. SHARE $ 248 0TH SHARE $

PE NONE $

0

ROW 1996 $

1

CONST 1997 $

40

FED SHARE$

40

GA. SHARE$

0TH SHARE$

DIST. 9

OPERATING 1995 $

69

FUND SOURCE: RURAL TRANSIT

FED SHARE$

41

FEDERAL TRANSIT ADMIN FUNDS
:::.:;::::::.:=:::::_.

GA. SHARE$

0TH SHARE$

28

1996 $

72

FED SHARE$

42

GA. SHARE$

0TH SHARE$

29

COUNTY P ,I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

POLK 620645
STATUS:

SR 6 FM OLD CEDARTOWN RD/CR 193 E TO RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : 6.27 MANAGER: OAY METTS (CM) SEND LGPA IN 1997

IN ROCKMART LANES.

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 30

FISCAL YEAR

COST ESTS

PE 1992 ROW 1995 CONST

UNDERWAY $ 6500 AFTER 97

POLK 620647
STATUS:

SR 6 FM CR 154 RECONSTRUCTION & WIDENING PROJECT MILEAGE : 4.60 MANAGER: RAY METTS (CM) SEND LGPA IN 1997

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDE~ HIGHWAY ADMIN FUNDS

PE 1992 ROW 1995 CONST

UNDERWAY

$

892

AFTER 97.

POLK 621420
STATUS:

SR 113 FM ROCKMART RECONSTRUCTION & PROJECT MILEAGE : 5.50 MANAGER: M GANNAWAY (C) CITY SGN 6/91 P UTIL IN

CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 ROW 1995 CONST

UNDERWAY
$ 2006 AFTER 97

POLK 62143X' STATUS:

SR 113 FM TA1LORSVILLE CL TO CR 31/STILESBORO . SEE

RECONSTRUCTION & WIDENING. NO LANE ADDITION

,,;;~"-,/i'i,,,,-

PROJECT MILEAGE : .00

MANAGER: M GANNAWAY

POLK 621470
STATUS:

SR 1/US 27 OVER CEDAR CREEK-NEAR CEDARTOWN REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 5
PROJECT MILEAGE : .21 MANAGER: J. dRAYBEAL REQ POLK DO UTILITIES UNDER #621320,_ 6-26-89.

POLK 621475
STATUS:

SR 1/US 27: BRIDGE OVER CEDAR CREEK TRIBUTARY SE CEDARTOWN REHAB. OF THE EXISTING BRIDGE($). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE: .00 MANAGER: J. GRAYBEAL LGPA COVERED BY i621470

POLK 631280
STATUS:

CR 439/LIME BRIDGE ROAD OVER McCURRY CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE: .00 MANAGER: BILL MCVEY POLK COUNTY SGN 7-7-92 ROW, UTILITIES & DETOURS

DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 62f'436=ls AN ASSOCIATED PROJECT.

PE 1993 ROW 1996 CONST

UNDERWAY

$

0

AFTER 97

PE 1993 UNDERWAY.

ROW NONE

$

0

CONST 1997

$

283

FED SHARE $

226

GA. SHARE $

57

0TH SHARE $

PE 1993. UNDERWAY

ROW NONE

$

0

:CONST 1997

$

133

FED SHARE $

106

GA. SHARE $

27

0TH SHARE $

CONG DIST. \:7
FUND souRcE: BRID6t\libGRAM
FEDERAL HIGHWAY JiliMbf FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST f997

$

15

FED SHARE$

12

GA. SHARE$

3

0TH SHARE$

~

11!:'lffl

~

~

~

~

i.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

POLK 641!l80
STATUS:

SR lBUS. FM PLANTATION AVE TO SOUTH OF g;DERTOWN BYPASS TURN LANES/ SAFETY PROJECT MILEAGE : 1.08 - EXIST. LANES: 2 ::/fROPOSED LANES: 3 MANAGER: BILL MCVEY SEND LGPA IN 1995

CONG DIST. 7 GRIP PROJECT FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

POLK 670540
STATUS:

11
LlWt$. CR 450/N CAVS SPRING ST/CEDARTOWN:ji~ : ll!:ER CRK
RPREPOLJAECCETMMENILTEAOGFETH: E E1X7 ISTING BR....t.P.....G. "..i.!:,.$. Jsj . NO ADDED

MANAGER: BILL MCVEY

..,:/:(:{\?):/

CEDARTOWN SIGNED 8-12-85,Jtp~)~O,W AND UTILITIES

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 31

FISCAL YEAR

COST ESTS

PE 1994 UNDERWAY

ROW 1995

$

5

CONST 1996

$

435

FED SHARE $

435

GA. SHARE $

0TH SHARE $

PE 1994 UNDERWAY

ROW LOCL

CONST 1995

$

210

FED SHARE $

168

GA. SHARE $

42

0TH SHARE $

POLK 670676
STATUS=

CR 6/LAKE cRtEK RD@ AkE/cREEK REPLACEMENT OF THE EXISTi~G BRIDGES(S). NO PROJECT MILEAGE : .25 PMOALNKAGcEoR: SIBGINLELDMFCOVREYRow, UTii'.!Ef'

...,.,.,,.,.,.,.,,.,,,.,,. .,.,.,.,.,.

CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1991 UNDERWAY

ROW LOCL

CONST 1995

$

321

FED SHARE $

257

GA. SHARE $

64

0TH SHARE $

POLK 670900
STATUS:

OLD CSX RAILROAD CORRIDOR FROM CEDARTOWN BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: JANET HARVEY LGPA TO BE DONE BY CONTRACT

DIST. 7
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
;:::;:;..

PE LOCL

ROW 1997

$

28

CONST 1997

$

407

FED SHARE $

326

GA. SHARE $

6

0TH SHARE $

87

POLK 6Bl418
STATUS:

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: CITY OF CEDARTOWN MANAGER: STEVE KISH

+ ){CONG DIS!iiI

.OPERATING 1995 $

30

F~:~::'18~dk: RURAL. TRANS:t:)
FEDE:iUJ):iRANSIT ADMIN}FONOS

FED SHARE$

17

GA. SHARE$

0TH SHARE$

13

POLK 6B1419
STATUS:

CITY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPigNT: CITY OF CEDARTOWN MANAGER: STEVE KISH

o:g;NG DIST. 7./f)}},,/
.,;gi;; SOURc:ifi(K6fu TRANSIT
FEDERAL ff::u-:.:-:i-:-l:,:i:-;,s iT ADMIN

1996 $

32

FED SHARE$

19

GA. SHARE $

0TH SHARE$

14

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WALKER 621192
STATUS:

CHICKAMAUGA BYP FM N LYTLE RD/CR 710 TO,:JJS 27 @SR 2/CATOOSA CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : 4.60 MANAGER: M GANNAWAY REQ CATOOSA UTIL 2/9l;WALKER

CHATTANOOGA TIP f 1
CONG DIST. 9 GRIP PROJECT FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS 62Yl92 IS AN ASSOCIATED PROJECT.

:~~~
STATUS:

hi~Bttf~> . :H~iLiT~~i~Nc~E~HE EXISTING

NO ADDED :)fLEs.

PROJECT MILEAGE : .10

MANAGER: BILL COUNTY SIGNED

MCVEY 12-1-87

FOR tBKfri:2

UTILITIES

ONLY

CONG DIST. 9
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

WALKER 631440
STATUS:

SR 1 AT LEE/GORDON M:d:it 'i~8AD
!!;~; ,i~~~~Y: . oo -
MANAGER: BURT RIDDLE
CONTACT TRAFFIC OPERATIONS

LANES: o /PROPO$iJ filillfs: o

CHATTANOOGA TIP f 21
CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

WALKER 641810
STATUS:

SR 1/US 27 FM EXIST 5 LANE NEAR CR 215 TO.. CHIT-CHAT_ i'fE>)Lss

TURN LANES /'SAFETY

PROJECT MILEAGE : 34 - EXIST. LANES: 4 /PROPOSEp)illffiff: 5

MANAGER: BILL MCVEY

COUNTY SGN 2-1-91 UTIL, ROW, DCL

T&S

}(CHATTANOOGA TIP t 4
,:r:::::: )<':ONG DIST. 9 GRIP PROJECT
FUND SOURCE: SURFACE TRANSPORT. FE;-;-D;.:--.:ERA..L,.. HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 32

FISCAL YEAR

COST ESTS

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 18060 13545 .
4515

PE 1988

UNDERWAY

ROW 1990 UNDERWAY

CONST 1996

$

250

FED SHARE $

200

GA. SHARE $

50

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST 1996

$

64

FED SHARE $

51

GA_- SHARE $

13

0TH SHARE $

PE 1993 UNDERWAY

ROW 1995

$

100

CONST 1996. $

363

FED SHARE $

290

GA. SHARE $'

73

0TH SHARE $

WALKER 641960
STATUS:

SR 193 OVER WEST CHICKAMAUGA CREEK REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: BILL MCVEY (M) SEND LGPA IN 1995

FUNr/i!Bi:mEt: BRIDGE PRosi'&M?; FED.IiliAbdhGHWAY

PE 1994

UNDERWAY

ROW 1995

$

1

CONST 1995

$

157

FED_ SHARE $

126

GA. SHARE $

31

0TH SHARE $

WALKER 650490
STATUS:

MCFARLAND AVE AT WEST LAKE, MAPLE, JAMES ST & REVERSE LN SIGNALS/ SAFETY PROJECT MILEAGE: 1.44 - EXIST. LANES: 3 /PROPOSED LANES: 3 MANAGER: BURT RIDDLE REQ ROSSVILLE DO UTIL 11/93; WALKER=NO UTIL INVOLVED 11/93

PE 1994

UNDERWAY

ROW NONE

$

0

FtiNo -:- ---.-:- ----.--:-:-:-:::::=:=:::;:::::toNST 19 9 5

$

souRcfi\i!Hl~AcE TRANSPORT/ .:

FED

.-: : ; WAY ADMIN

FED SHARE $ GA. SHARE $

350 280
70

0TH SHARE $

WALKER. 6B1384
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS"'RECIPIENT: WALKER MANAGER: STEVE KISH

CONG DIST. \9

OPERATING 1995

$

61

AD~IN FUND SOURCE: RuRAfi1'ilisIT

FEDERAL TRANSIT

FUNDS

FED SHARE$

35

GA. SHARE$

0TH SHARE$

26

. ...



~

~

~

~

~



COUNTY P.I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WALKER 6B1385
STATUS:

COUNTY OPERATED PUBLIC TRANSIT SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

WALKER 6C2384
STATUS:

ONE CONVERSION VAN TRANSIT FACILITIES/ CAPITAL FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

WALKER 6C2385
STATUS:

TWO CONVERSION VANS TRANSIT FACILITIES/ FUNDS RECIPIENT: WALKER MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

22-Feb-1994 Page 33

FISCAL YEAR

COST ESTS

OPERATING 1996

$

65

FED SHARE $

37

GA. SHARE $

0TH SHARE $

.28

CAPITAL 1995

$

29

FED SHARE $

23

GA. SHARE $

3

0TH SHARE $

3

CAPITAL 1996

$

57

FED SHARE $

46

GA. SHARE $

5

0TH SHARE $

6

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY. 1995/FY 1997
COMMENTS

WHITFIEL I-75 & SR 3 CONN FM CR 91 E TO DUG GAP IW E/I-75

610690 INTERCHANGE / RECST. OR REHAB.

\\.

PROJECT MILEAGE : . 38 - EXIST. LANES: 2 /PilOPOSED LANES: 6

MANAGER: RAY METTS (C)

......

if2~P9lb STATUS: WHITFIELD COUNTY SIGNED FOR UTHITIES .

;,..

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

WHITFIEL I-75@ SR 3/US 41/ROCKY 610760 INTERCHANGE/ RECST. OR
PROJECT MILEAGE : .00 MANAGER: J. GARLAND (M) STATUS: SEND LGPA IN 1996

'tJiliES: 4 /PROPOSED ~ES: 6

i{ ~:;~:EL ::i~~~tt?;~:J~hir~:~c: :::oposi' 6

MANAGER: RAY METTS (M)

j\.,.

STATUS: SEND LGPA WHEN PROJECT IS ADDED

CONG DIST. 9 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 9 FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 34

FISCAL YEAR

COST ESTS

PE 1992

UNDERWAY

ROW 1995

$

100

CONST 1996 $ 2528

FED SHARE $ 2022

GA. SHARE $

506

0TH SHARE $

PE 1995 ROW 1997 CONST

$ 250

$

250

AFTER 97

PE 1995 ROW 1996 CONST

$

16

$

10

AFTER 97

WHITFIEL I-75 RAMP AT SR 201 610900 RAMP/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST .. LANES: 6 MANAGER: RAY METTS (M) STATUS: SEND LGPA IN 1997

DIST. 9
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW 1996 CONST

$

4

$

10

.AFTER 97.

WHITFIEL SR 3/US.41 FM N OF STONECREST DR N TO CR 620960 RECONSTRUCTION &wIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: 2.90 MANAGER: J. GARLAND STATUS: WHITFIELD SGN 7/,11/89 TIL. REQ TUNNEL HILL 6-20-89
WHITFIEL SR 71 FM CR 228/WILLIAMS RD TON OF CR 213/677 620970 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE: 4.30 MANAGER: J. GRAYBEAL (M) STATUS: WHITFIELD SIGNED 5-30-89 FOR UTILITIES.
WHITFIEL SR 71 FM N OF CR 213/677 NORTHERLY, TO CR 19/COHUTTA 620975 RECONSTRUCTION & WIDENING F~OM 2 LANES TO 5.LANES.
PROJECT MILEAGE: 4.10 MANAGER: J. GRAYBEAL STATUS': WHITFIELD CO SGN 5-30-89 UTIL;REQ COHUTTA DO UTIL 11-1-88 .

o:sBfra;it: SURFACE TRJi:tai+:
}1tIGHWAY JU)~l:~ i~J:>S

PE 1992

UNDERWAY

ROW 1993

UNDERWAY

CONST 1996 . $ 6246

FED.SHARE $ 4997

GA. SHARE $ 1249,

0TH SHARE $

FUND souRctl: ibfu.AcE
FEDERAL .itfoit#J{y

PE 1992

UNDERWAY

ROW 1993

UNDERWAY

:,:::::coNST f997

$ 5266

FED SHARE $ 4213

GA. SHARE $ 1053

0TH SHARE $

CONG DIS=:::\:9 FUND souRcE: suRFii::fu\t'fuspoRT.
FEDERAL HIGHWAY Al'.i~IN FUNDS

PE 1992 UNDERWAY

ROW 1993 UNDERWAY

.CONST 1997

$ 4059

FED SHARE$ 3247

GA. SHARE$

812

0TH SHARE.$



~

~

I'

"



COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

WHITFIEL SR 71 FM NORTH BYPASS N TO DAWNVILLE 621290 RECONSTRUCTION & WIDENING FROM 5 LANES
PROJECT MILEAGE : 1.32 MANAGER: M GANNAWAY STATUS: REQ DALTON DO UTILITIES 9-20-92;

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

WHITFIEL SR 52 FM SR 52 BUS TO CR 112
621300 RECONSTRUCTION & WIDENING PROJECT MILEAGE : .65 MANAGER: BILL MCVEY
STATUS: WHITFIELD COUNTY SIGNED

UTILITIES.

CONG DIST. 9
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

WHITFIEL SR 52 FM I-75 TO SR 621800 RECONSTRUCTION & MTl~~~TT
PROJECT MILEAGE : 1.80 MANAGER: BILL MCVEY (M) STATUS: SEND LGPA WHEN PROJECT IS

CONG DIST. 9
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 35

FISCAL YEAR

COST ESTS

PE 1992 ROW 1996 CONST

UNDERWAY $ 4479 AFTER 97.

PE 1992

UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$ 1439

FED SHARE $ 1151

GA. SHARE $

288

0TH SHARE $

PE 1996 ROW CONST

$

85

AFTER 97

AFTER 97

WHITFIEL SR 201 EB MP. 13.6-14.9; WB MP 631250 ADDITION OF A PASSING LANE.
PROJECT MILEAGE : 3,40 MANAGER: BILL MCVEY (M) STATUS: SEND LGPA IN 1995
WHITFIEL SR 3/US 41 FM CR 306 TO SB I-75 RAMPS IN 631360 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 3.28 MANAGER: RAY METTS (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP

DIST. 9 FUNDSOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
Disdi 1/i::~
FUNoJ~;qi&k: suru:N,$ T~ijJSM<
FEDllltAl{/iiIGHWAY ADMIN\FUNDS

PE 1992

UNDERWAY

ROW 1996

$

276

CONST 1997

$ 3747

FED SHARE $ 2998

GA, SHARE $

749

0TH SHARE $

PE ROW CONST

$

173

AFTER 97

AFTER 97

WHITFIEL SR-3; 7 CULVERT EXTENSIONS FM MP 0.18 TO MP 5.36 631380 BRIDGES/ SAFETY
PROJECT MILEAGE : 5.18 MANAGER: BILL MCVEY STATUS: COUNTY REFUSED TO COMMIT FUNDS 2-8-94

\}:f;pNG DIST.
;JJri sou~c:::iffijWf. SAFETY
FEbE-:R:::::,A:-:, L""".'.;;:i;:i::l;:G::::::H::::=W:::;AY ADMIN FUNDS

WHITFIEL PEDESTRIAN/BIKE PATHS AND LANDSCAPING IN DALTON 670890 BICYCLE/PED. FACILITY/ ENHANCEMENT.
PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: CORA COOK STATUS: LGPA TO BE DONE BY CONTRACT

CONG DIST. \9 FUND SOURCE= TRANlniimANCE.
FEDERAL HIGHWAY MM:tN FUNDS -:::::::;:-.-:,:-:;:-:-

PE 1993

UNDERWAY

ROW 1995

$

32

.,:,::'='(CONST 1997

$

470

FED SHARE $

423

GA. SHARE $

47

0TH SHARE $

PE 1996

$

59

ROW 1996

$

188

CONST 1996

$

480

FED SHARE$

384

GA. SHARE$

50

0TH SHARE$

146

GEORGIA DEPARTMENT OF TRANSPORTATION -

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 36

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

-P--.I-.-N-O--. -----------

PROJECT DATA

COMMENTS

YEAR

ESTS

.-------------------------------------------------------------. -------------------------------------------------

WHITFIEL COUNTY OPERATED PUBLIC TRANSIT SERVICE

6Bl389 TRANSIT FACILITIES/ OPERATIONS

CONG DIST. 9

FUNDS RECIPIENT: WHITFIELD

OPERATING 1995

$

176

-MANAGER: STEVE KISH

FUND SOURCE: RURAL TRANSIT

FED SHARE $

106

STATUS:

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

70

WHITFIEL COUNTY OPERATED PUBLIC TRANSIT 6B1390 TRANSIT FACILITIES/
FUNDS RECIPIENT: WHITFIELD MANAGER: STEVE KISH STATUS:

CONG DIST. 9
FUND SOURCE: RURAL TRANSIT FEDERAL TRANSIT ADMIN FUNDS

OPERATING 1996

$

185

FED SHARE $

111

GA. SHARE $

0TH SHARE $

74

WHITFIEL ONE CONVERSION VAN

VAN

6C2389 . TRANSIT FACILITIES

FUNDS RECIPIENT:

MANAGER: STEVE KISH

STATUS: LGPA NOT APPLICABLE

CONG DIST. 9

CAPITAL 1995

$

49

FUND SOURCE: RURAL TRANSIT

FED SHARE $

39

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

5

0TH SHARE $

5

.

,, .
.. ~ ..... ~.v,,p

l!!e'ffl

~


COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 1

FISCAL YEAR

COST ESTS

ALL 770391
STATUS:

LUMP SUM: REMAINDER OF THE METRO SIGNALS/ SAFETY PROJECT MILEAGE : .00 MANAGER: LGPA NOT APPLICABLE

SYSTEM LANES: 0

ATLANTA TIP f R 98 CONG DIST. 5 & 4
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PENONE $ ROW 1995 $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
100 4435 3548
887

ALL 7C2513
STATUS:

TWO CONVERSION VANS (l WITH A TRANSIT FACILITIES/ CAPITAL
FUNDS RECIPIENT: GEORGIA ~~.t(':}('/)': MANAGER: STEVE KISH FOR USE IN RURAL AREAS

CONG DIST. 5

CAPITAL 1995

$

80

FUND SOURCE: RURAL TRANSIT

FED SHARE$

64

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

16

0TH SHARE$

ALL 7C2514
STATUS:

TWO CONVERSION VANS TRANSIT FACILITIES/ FUNDS RECIPIENT: MANAGER: STEVE KISH FOR USE IN RURAL AREAS

CONG DIST. 5

CAPITAL 1996

$

81

FUND SOURCE: RURAL TRANSIT

FED SHARE$

65

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

16

0TH SHARE$

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CLAYTON 712425
STATUS:

I-75 FM SR 3/US 41/0LD DIXIE HWY TO RECONSTRUCTION & WIDENING FROM 4 LANES PROJECT MILEAGE: 2.90 MANAGER: J. GRAYBEAL (M) SEND LGPA WHEN PROJECT IS

ATLANTA TIP t CL-R 11
CONG DIST. 3
FUND SOURCE: NAT.' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 2

FISCAL YEAR

COST ESTS

PE 1996 ROW CONST

$ 1000 AFTER 97 AFTER 97

CLAYTON 712630
STATUS:

I-75/MORROW@ SR 54. (INCL INTERCHANGE/ RECST. OR PROJECT MILEAGE : .00 MANAGER: J. GRAYBEAL(CM)
COUNTY SGN FOR PUB UTIL "'',,,c/,;.

ATLANTA TIP t CL-R 31 CONG DIST. 3
8
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1997 CONST

UNDERWAY

$

53

AFTER 97

CLAYTON 712970
STATUS:

HOV LUMP SUM SIGNING
HOV LANES/ SAFETY PROJECT MILEAGE : .00 MANAGER: BURT RIDDLE NOT APPLICABLE

ATLANTA TIP t R 73 .CONG DIST. 5
0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS 71297Z IS AN ASSOCIATED PROJECT.

CLAYTON . I-675, I-75, I-20: IMPACT ATTENUATORS&BARRIER WALL .i\'.f::@\\

~!~i~~~~Es: 713050 ;:;~~/!i~:i~~T~R~o~

o /PROPOSEP~~[; o

MANAGER: BURT RIDDLE

STATUS: NOT APPLICABLE

}ATLANTA TIP t R 130
CCcl//C::ONG DIST. 3 & 5
"ecFUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

i t CLAYTON . I-75, I-85, I-20, I-285 & I-675 @ VARIOUS LOC METRO ATL

\g]) 713070

GUARDRAIL/ MAINTENANCE PROJECT MILEAGE : 34.00

EXIST. LANES: 0 /PROPOSED LANl!:~1

MANAGER: L. SEABROOK

STATUS: NOT APPLICABLE. '

ATLANTA T!19t R 130
5
CONG DI!>'.rf FU;i}awJt: I-STATE MAMt
FEDEill (HIGHWAY Ab!:irn.:FuN'Ds

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1995 $ 6221

FED SHARE $ 4977

GA. SHARE $ 1244

0TH SHARE $

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1995 $ 1000

FED SHARE $ 1000

GA. SHARE $

0TH SHARE $

PE NONE $

0

ROW 1994

$-

0

CONST. 1995

$

523

FED SHARE$ 523

GA. SHARE$

0TH SHARE$

CLAYTON 713090
STATUS:

I-85 NB 62 SIGNS FROM I-285 TO SR 166 LAKEWOOD FWY FULTON
SIGNING/ MAINTENANCE PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE NOT APPLICABLE

PE NONE $

0

ROW NONE $

0

i:CC/tONST'l995 '$ 223

;~;; SOURcfi ff;ATE MAiNT. /
FEO~ ,jt~(i~#AY ADMIN FUNDS \

FEDSHARE $ 223 GA. SHARE$

71309.tt::i:suut ASSOCIATED PROJECT;

0TH SHARE$

CLAYTON 713210
'STATUS:

I-285 EAST TO I-75 SOUTH RAMP ALIGNMENT
RAMP/ RECST. OR REHAB.
PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER:. D. SMITH
SEND LGPA IN 1995

CONG DIST. "3
FUND SOURCE: I-sTi.'.ff!l::T. FEDERAL HIGHWAY AI/~}NFUNDS

PE 1995 ROW 1997
CONST

$

10

$

50

AFTER 97

.. ,



I!!!!'!!'!!!!

~

~



COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CLAYTON 721040
STATUS:

SR 54 (& FAYETTE CO) @ MORNING & CAMP cm<s; & FLINT RIVER

REPLACEMENT OF THE EXISTING BRIDGES (S) . tROM 2 TO 4 LANES.

~;i:= 1~Jt~p1 :~:Ei;~;~:~:OUTILITIES; FAYETTE

9-11-89

CLAYTON 721270

;;ci!(:ii~~r:',F=,~~~~L~~~~f~ll~ ;o~;~i,!,V'""

:!Ci> 30

~~i~:M!~E:~~N~L~s

. .:: ::

STATUS: DOT TO PAY UTILITIES 11-1,QfQ?. (

ATLANTA TIP f CL23/FY2 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f CL10/DK8 CONG DIST. 3 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

~~~B~~T~ ~~~~~B~/ CLAYTON

9

721290 !~c~~s~:u~~I~~ {F:i~l!fJ~ ~~o!-~N

~;i:=:~::~;i:~;it STATUS:

1
!~bis;/dA$ grE/FAX~IwJil~i~f

ATLANTA TIP f CL15/FY4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 72144X
STATUS:
CLAYTON 721480
STATUS:

28:< SR 54 FM MCDONOUGH RD NE TO SR 7/US 19/41 SEE FAYdff 1
RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSEb':i PROJECT MILEAGE : 5,53 MANAGER: M. REYNOLDS
SR 138 FM WALT STEPHENS RD EAST TO I-75/HENRY'~gc,, RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.55 MANAGER: J. GARLAND (M) REQ CLAYTON & HENRY COUNTIES DO UTILITIES 6-7-90.

\ATLANTA TIP f CL41/FY10 ''(CONG DIST. 3
',:{);UND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
d2f440<rs AN ASSOCIATED PROJECT.
mw\;~;~~.;1, , CL "
FUND s66Rci = suRFAcE Tru&JJi!W'.f:\ FEC>s:@ HIGHWAY ADMIN FUNDS

CLAYTON 721555
STATUS:

SR 85@ SR 331 & I-75 RAMP INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. GODWIN COUNTY SGN ROW & UTILITIES 3-2-93; FOREST PARK N/A

,;f[~~;.;'.,'.;;rfJr"
;gm; SOURcEiiik~: SAFETY
FEDERAL HIGH.iiAY ADMIN

CLAYTON 721860
STATUS:

TARA BLVD@ I-75 (GATEWAY PROJECT) LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 6 /PROPOSED LANES: 6 MANAGER: J. GRAYBEAL (C) TO BE DONE BY CONTRACT

ATLAN~: ~:[: f CONG DIST. \3
FUND SOURCE: FEDERAL HIGHWAY

22-Feb-1994 Page 3

FISCAL YEAR

COST ESTS

PE 1986

UNDERWAY

ROW 1995

$

552

CONST 1995

$ 3246

FED SHARE $ 2597

GA. SHARE $

649

0TH SHARE $

PE 1992

UNDERWAY

ROW 1992

UNDERWAY

CONST 1995

$ 4235

FED SHARE $ 3388

GA. SHARE $

847

0TH SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY $ 1600 AFTER 97

PE 1996 ROW CONST

$

0

AFTER 97

AFTER 97

PE 1992 ROW 1996 CONST

UNDERWAY $ 4970 AFTER 97

PE 1993

UNDERWAY

ROW LOCL

1995

$

904

FED SHARE $

814

GA. SHARE $

90

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

120

FED SHARE $

96

GA. SHARE $

36

0TH SHARE $

60

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEl'AK,l1ENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CLAYTON 730920
STATUS:

PANOLA RD FM STAGECOACH RD TO FLAKES MILL RD IN HENRY CO RECONSTRUCTION & WIDENING FROM 2 LANES TA LANES.
~~~!: :~:Ef;~~iL~~:~~) UTILITIES; HENI&i!lissED 6-26-92

ATLANTA TIP t CL16/HE4
CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 4

FISCAL YEAR

COST ESTS

PE ROW LOCL CONST

$

5

AFTER 97

CLAYTON 731050
STATUS:

SR 85 AT SR 138

INTERSECTION IMPROVEMENT PROJECT MILEAGE : 1.18 ~

/PROPOSED :MES: 4

MANAGER: D. GODWIN (C)

REV REQ COUNTY- DO ROW & u-rfff:fifa 11-4-93

STATUS:

ATLANTA TIP t CL 80
CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP t CL 81
CONG DIST. 3 & 5
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 731070
STATUS:

TARA BLVD AT OLD DIXIE HWY INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .95 - EXIST. LANES: MANAGER: D. GODWIN REV REQ COUNTY DO ROW AND UTILITIES 11-4-9~::

CLAYTON 731400
STATUS:

SR3/US19&41/TARA BLVD AT CR 537/FREEMAN RD

INTERSECTION IMPROVEMENT/ SAFETY

.

PROJECT MILEAGE : .31 - EXIST . LANES: 0 /PROPOSED LANES.::

MANAGER: D. GODWIN

CLAYTON SGN FOR UTILITIES 12-1-92

CL 84
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
t~~~~~si~j~t CL 92
;:il!~!~w!~Tf.Bt-1~!1:ui!~::<

CLAYTON 751730
STATUS:

CR 1342/BATTLE ~REEK RD@ JESTERS CREEK REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .00 MANAGER: D. GODWIN .(CM) CLAYTON SIGNED 6/6/89 FOR ROW AND UTILITIES.

CLAYTON BATTLECREEK-MT.ZION FM SOUTHLAKE PKWY TO LAKE HARBIN RD 751770. RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
'PROJECT MILEAGE : 2.63
MANAGER: J. GRAYBEAL. (C)
STATUS: CLAYTO-N. COUNTY. SIGNED 3-5-91 . FOR ROW AND UTILITIES.

FUND souRcit'iiid:DGE PROGRAM

FEDERAL.ill:GHW'AY ADMIN

..-.-

,.,,.,,..,-



i T

FUND SOURCE: FEDERAL HIGHWAY

PE NONE

$

ROW LOCL

CONST 1995

$

FED SHARE $

GA. sHARE $

0TH SHARE $

0
453 408
45

PE 1994

UNDERWAY

ROW LOCL

CONST 1995

$

372

FED SHARE $. 335

GA. SHARE$

37

oTH SHARE $

PE 1994

UNDERWAY

ROW LOCL

CONST 1995

$

434

FED.SHARE$

434

GA. SHARE$

0TH SHARE$

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

154

FED SHARE$

154

GA. SHARE$

0TH SHARE$

PE 1991 UNDERWAY

ROW LOCL

.

1996 $ ' 409

FED SHARE. $ . 327

.GA. SHARE$

82

0TH S_HARE $

PE 1995 ROW LOCL CONST

. $

10

AFTER 97

~

~



COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CLAYTON 751775
STATUS:

BATTLE CREEK RD FM VALLEY HILL RD TO SOUTHLAKE PKWY RECONSTRUCTION & . WIDENING FROM 2 LANES T:...4 LANES. PROJECT MILEAGE: 1.98
~~;~:= :tii4hs cgtJN;~D=i~NJ;l 6-4-91 FOR ROW &

ATLANTA TIP lt CL 17 CONG DIST. 3
FOND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 5

FISCAL YEAR

COST. ESTS

PE 1995 ROW LOCL CONST

$

10

AFTER 97

CLAYTON 751790
STATUS:

PANOLA RD FM BOULDERCREST RD TO,,sfkai28i~H RD



1

::g~~;R~iii~~E& .wiD~~ING FRO~J#~ES TO 4 LANES. ;

MANAGER: M. REYNOLDS (M) ; :: : :



CLAYTON COUNTY SIGNED 5-21:f:91:toR. ROW, UTIL & 100% fu/COST

CLAYTON 751800
STATUS:

TO BOOLOtll.T ANVILBLOCK RD FM END g;;(:tAhENED SECTION E

RD

RECONSTRUCTION & WIDENlNG{FROM 2 LANES TO 5 LANE.sf'/::::/"'''.

PROJECT MILEAGE : .63

MANAGER: D. GODWIN (C)

CLAYTON COUNTY SIGNED 6-4-91

ATLANTA TIP# CL16/HE4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP# CL 60 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 ROW LOCL CONST

$

10

AFTER 97

PE 1996 ROW LOCL CONST

$

10

AFTER 97

CLAYTON 751810
STATUS:

FLINT RIVER RD FM WEBB DR TO TARA BLVD RECONSTRUCTION & WIDENING FROM 2 LANES TO PROJECT MILEAGE : 2.71 MANAGER: D. GODWIN (C) CLAYTON COUNTY SIGNED 5-21-91 FOR ROW

FUND SOURCE: SURFACE TRANSPORT. JfEl)ERAL.HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

10

AFTER 97

CLAYTON SR 314/FAYETTE' LE RD FM SR 279 TO NORMAN DR/CR

FAYETTE...

751850 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.

.

iliqH~:~:~~~t~~rJ~ks STATUS:

11-0J~~ 9-30-91; FAYETTE REFUSED

CLAYTON 752060
STATUS:

MORROW RD/CR 1348@ JESTER'S CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: D. GODWIN CLAYTON COUNTY SGN ROW, UTILITIES & DETOURS 6-2-92.

CLAYTON 752180
STATUS:

CONLEY RD (AIRPORT RD EXT) FM OLD DIXIE HWY/SR 3 TO SR 54 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 1.70 MANAGER: G. ROSS SEND LGPA WHEN PROJECT IS ADDED TO CWP

.. :!~TA :ft:# CL5/FY8

PE 1996

))::Ot-lG DIS.'.1'{{5

ROW

~6WEf; F;:i

1
SURFACE T~;t'8lfi:

CONST

FEDERAL: HIGHWAY ADMIN FUNDS

/.

75185:i('IS AN ASSOCIATED'''PROJECT .

$

250

AFTER 97

AFTER 97

TA TIP lt c'.1J\/ >
DIST.
.FtiND SOURciD::aKioGE PROGRAM
FEDERAL.,HIGH.WAY ADMIN

PE 1993

UNDERWAY

ROW LOCL

1995

$

196

FED SHARE $

157

GA. SHARE $

39

0TH SHARE $

ffp ATLANTA

lt

CONG DIST.\3

PE 1995 ROW LOCL CONST

$

51

AFTER 97

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CLAYTON 752240
STATUS:

FOREST PARKWAY @ GERMAIN INDUSTRIAL BLVD.. WEST OF SR 42

INTERSECTION IMPROVEMENT / SAFETY

\\

PROJECT MILEAGE: .45 - EXIST. LANES: 4 /~ROPOSED LANES: 4

MANAGER: D. GODWIN (C)

CLAYTON COUNTY SIGNED 9-7-93 FOR ROW &

.:::!tff{lll

ATLANTA TIP f CL 86 CONG DIST. 3
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 770230
STATUS:

ATLANTA TIP f CL 91 CONG DIST. 3
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

2;:--Feb-1994 Page 6

FISCAL YEAR

COST ESTS

PE 1994

UNDERWAY

ROW LOCL

CONST 1995

$

532

FED SHARE $

479

GA. SHARE $

53

0TH SHARE $

PE ROW LOCL CONST

$

8

AFTER 97

CLAYTON 77046,0
STATUS:

JESTERS CK GREENWAY FMfffoih:sBORO TO MORROW
BICYCLE/PED. FACILITY / ENHANCEMENT PROJECT MILEAGE: 4.00 -EXIST. LANES: 0 /PROPQ$lffiifilffiEs: 0
MANAGER: UNKNOWN TO BE DONE BY CONTRACT

ATLANTA TIP t CL 89
CONG DIST. 3
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

CLAYTON 770500
STATUS:

.HISTORIC DEPOT RESTORATION IN JONESBORO MISCELLT'.t1EOUS IMPROVEMENTS / ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: UNKNOWN TO BE DONE BY CONTRACT

CLAYTON 770600
STATUS:

TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN SIGNALS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANESj
MANAGER: BURT RIDDLE CLAYTON SGN DO ROW, UTIL, PE & 20% CONSTRUCTION 8-3-93.

CL 90
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS
<:ti;ii:=::. .
;~~t \t ~~~~~sf CL 94

CLAYTON 7V1011
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY MANAGER: STEVE KISH

\\?<:)NG
. ;~; SOORclil ;ts~RLY FEDERAL.TR.lillstT

CLAYTON 7Vl012
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN CLAYTON COUNTY' MANAGER: STEVE.KISH

PE 1995

$

40

ROW 1995

$

300

CONST 1995

$ 1394

FED SHARE $ 1115

GA. SHARE $

68

0TH SHARE $ .. 347

PE LOCL

ROW LOCL

CONST 1996

$

94

FED SHARE $

75

GA. SHARE $

0TH SHARE $

19

PE 1994

$

50

ROW NONE

$

0

CONST 1995

$

450

FED SHARE $

360

GA. SHARE $

0TH SHARE $

90

~M'ITAL 1995

$

27

FUND FED SHARE$

22

GA. SHARE$

2

0TH SHARE $_

3

CAPITAL 1996

$

28

FUND

FED SHARE$

22

GA. SHARE$

3

0TH SHARE$

3

,: ., . ..,.

,.

Qt.,_J,_.

t2L:i..!i-!:2l

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COBB 712750
STATUS:

WINDY HILL RELIEVER BRIDGE OVER I-75 (PaASE I) CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED. PROJECT MILEAGE : .00
~:G:~~ \~o:~siTigTIES & 100% PE 3-26;~;:::::

ATLANTA TIP i C0171
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 7

FISCAL YEAR

COST ESTS

PE LOCL

ROW NONE

$

CONST 1995 $

FED SHARE $

GA. SHARE $

0TH SHARE $

0 5500 4400 1100

COBB 712752
STATUS:

WINDY HILL RELIEVER FM COBB PKWY/Tb THE I-75

RECONSTRUCTION & WIDENING. NO{LANE :),DDITION

~~i!: M~~E!~!s: (M;o . J)j:! 1:1!;::>

-:-:-.-:.'."-'.

COBB SGN 3-26-93 UTIL/PE/ROW"EXECPT FROM us 41 TO cfi~tE 75

ATLANTA TIP i CO 171
CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW 1996

$

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

1200 1600 1280
320

COBB 7127.53
STATUS:

WINDY HILL RELIE~::~!II!~::~ BR TO POWERS FERRY,ijp
CONSTRUCTION OF NEW ROUTE}WITH 4 LANES PROPOSED . PROJECT MILEAGE: .70 MANAGER: G. ROSS (CM) COBB SGN DO ROW, UTILITIES & J:li:-r 100% PE 3.,;26:f93) /

COBB 712800
STATUS:

FbJ KENNEDY INTERCHANGE@ I-75 (CONTRACT l);SEE 71Y800

INTERCHANGE / NEW CONSTRUCTION

.

. : }/ : }

PROJECT MILEAGE : . 00 - EXIST. LANES: 6 /PROPOSED)LANES: 10

MANAGER: G. ROSS (C)

......... .

COBB SGN DO ROW, UTIL, PE & $3,872,000 CST:,G9.$.i;::~q1i~93

ATLANTA TIP i CO 171
'CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS
,/ATLANTA TIP i CO-R 78 f:coNG DIST. 6
)~UND SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
)fifefo6',:IS AN ASSOCIATED PROJECT.

PE LOCL

ROW LOCL

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

4200 3360
840

PE LOCL

ROW LOCL

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

17007 13606
471 3872

COBB 712804
STATUS:

KENNEDY INTERCHANGE I-75 IMPRV INTERCHANGE/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. MANAGER: G. ROSS (CM) COBB SGN FOR ROW, UTILITIES & 100% PE 3-26-93

FUND :~6tffldi: I-ST/\'l'E MAX~>.
FEDl!i.tuu>li'rGHwAY AbMIN tyNl::5s

PE LOCL

ROW LOCL

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

39855 35870
3986

COBB 712890
STATUS:

I-75/SR 401 FM I-285 NORTH TO SR 5 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 8.38 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: E. LAWS
NOT APPLICABLE

:::~t;; SOURcf{::~~s. ENHANCE. : : FEDERAL -.Hl:CHWAY ADM IN FUNDS .. :::: ',

PE NONE

$

ROW NONE

$

~ 9
:'. /CONS;E~ ~!ARE

GA. SHARE $

0TH SHARE$

0
0
3687 2950
737

COBB 71297Y
STATUS:

HOV LUMP SUM SIGNING ON I-75 & I-85 METRO ATL; SEE CLAYTON HOV LANES/ SAFETY PROJECT MILEAGE: .00 EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

ATLANTA i.P i R 73
CONG DIST .<7
FUND SOURCE: I-ST.i{ti\i{Ji'.~NT.
FEDERAL HIGHWAY AbM'tN FUNDS
712970 Is AN Ass6d.ii.TED PROJECT.

PE 1993

UNDERWAY

ROW NONE

$

0

CONST 1995

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COBB 71314Z
STATUS:

COMMUNICATION CABLE ON I-75 FM MISCELLANEOUS IMPROVEMENTS/ SAFETY' PROJECT MILEAGE : 7.13 - EXIST. LANES: MANAGER: BURT RIDDLE

I-285; FULTON

ATLANTA TIP f R 169 CONG DIST. 5 & 6
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

COBB 713240
STATUS:

I-285@ WEST PACES FERRY RD BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: G. ROSS SEND LGPA IN 1997.

CONG DIST. 6
FUND SOURCE: I-STATE MAINT . FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Pag.e 8

FISCAL YEAR

COST ESTS

PE NONE $

0

ROW NONE $

0

CONST 1995 $

0

FED SHARE$

GA. SHARE$

oTH SHARE $

PE 1995 ROW NONE.
CONST

$

50

$

0

AFTER 97

COBB

KENNEDY INTERCHANGE

71Y800 INTERCHANGE/ NEW IN~:TRU~TTnN

'.. - ' PROJECT MILEAGE : . 00 -

MANAGER: G. ROSS (C)

STATUS:

ATLANTA TIP f CO-R 78
CONG DIST. 6
FUND SOURCE: I-STATE MAINT . FEDERAL HIGHWAY ADMIN FUNDS 712800 IS AN ASSOCIATED PROJECT.

PE LOCL ROW 1995 $' CONST 1995 $
. FED SHARE $ GA. SHARE $ 0TH SHARE $

3500 4866 4379
487

COBB 71Y804
STATUS:

KENNEDY INTERCHANGE@ I-75 - TO
INTERCHANGE/ NEW CONSTRUCTION
PROJECT MILEAGE : .oo - EXIST. LANES: 6 /PROPOSE:B:@mkS: 10
MANAGER: G. ROSS (CM) COBB SGN FOR ROW, UTILITIES & 100% PE

COBB

N'SIDE PKWY@ CHATTAHOOCHEE RVR INCL APPR/& ;:~,ON CO

720125 REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 6

PROJECT MILEAGE : 1.01

MANAGER: BEN BUCHAN

STATUS: COBB SGN 10-9-79 UTIL; REQ ATLANTA DO UTIL 2-27-90

COBB 720468
STATUS:

SR 6/US 278@ CSX RR 2.8 MI W/POWDER SPRINGS; & 72Y468 BRIDGE REMOVAL/ NEW CONSTRUCTION PROJECT MILEAGE.: .30 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. GODWIN REQ COBB COUNTY DO UTILITIES 5-8-91

)ATLANTA TIP f CO-R 78
'ONG DIST. 6
\(==;UNO SOURCE: NAT' L HIGHWAY fEQ:E:R,A:C, HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

4000 3200
800

rh, ..... ATLANTA

t AT12/co24

=?\<::ONG DIST(::5 & 6

F~;:~2m.mr BRIDGE ~ROG~>>'
FEDERA'.LJtrGHWAY ADMIN FtiNbs 72Y12S}is AN AssocfA.TED PROJECT.})

PE 1981 UNDERWAY

ROW 1985 UNDERWAY

CONST 1996

$ 2500

FED SHARE $ 2000

GA. SHARE $ 500

0TH SHARE $

:;:i~~~~si~p7!:r@i~*! /

R~: t::! g:g:::~~

............ ,.

.:..,......,.::-:.:::::.:.::-:,coNST 1995 . $ . 855

idiio souRcii=1Jfu.AcE TRANSPORT;)

FED SHARE $ 684

FEDERAL HIGHWAY ADM IN FUNDS , : : : \
72Y468 fs hlr ASSOCIATED PR,Q#c:t?

GA. SHARE $ 171 0TH SHARE $

COBB 721150
STATUS:

SR 3/US 41/COBB PKWY FM AKERS MILL RD TO SPRING ROAD RECONSTRUCTION & WIDENING FROM 4 LANES TO 8 LANES.
PROJECT MILEAGE : .54 MANAGER: G. ROSS (C) COBB SGN 12~3-92 .FOR UTILITIES, PE & $100,000 CONSTRUCTION.

ATLANTA,fiP f CO 80
CONG DIST. S
FUND SOURCE: NAT'.:dkdk:~y FEDERAL HIGHWAY ADMIN-FUNDS

PE 1992

UNDERWAY

ROW 1995 $ 2070

CONST 1997

$ 2130

FED SHARE $ 1704

GA. SHARE $ 326

0TH SHARE $ 100

~

~



i""""'"""

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COBB 721250
STATUS:

SR 3/US 41/COBB PKWY FM SPRING RD N TO TERRELL MILL PHl,3
RECONSTRUCTION & WIDENING FROM 4 LANES TC>:: 8 LANES.
PROJECT MILEAGE : 1.69 MANAGER: G. ROSS (M) COBB COUNTY SIGNED 7/14/88 FOR

ATLANTA TIP t CO 81
CONG DIST. 6 & 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY AOMIN FUNDS

22-Feb-1994 Page 9

FISCAL YEAR

COST ESTS

PE 1992 ROW 1996 CONST

UNDERWAY
$ 1311 AFTER 97

COBB 721310
STATUS:

SR 120/ROSWELL RD FM SR 120 LP T$}~tJB~6~T RD/~i~'.l'TA

RECONSTRUCTION & WIDENING FROM:4 ~ES TO 6 LANES.

PROJECT MILEAGE : 1.50

MANAGER: D. SMITH (M) REQ MARIETTA UTIL 11/90;

~Vin . REFUSED BY LETTER

ATLANTA TIP f CO 177 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW 1997 CONST

$

80

$ 1050

AFTER 97

COBB 721670
STATUS:

S.MARS HILL EXT FM OLfr'=pi 278/SR6 BUS TO SR RECONSTRUCTION & WIDENING FROM 2 LANES TO 4
:~!~!h PROJECT MILEAGE : 5.44
MANAGER: D. SMITH (CM) CONTRACT SENT 8-12-93 REQ

HWY

ATLANTA TIP f CO 123

CONG DIST. 7

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL ROW 1996 CONST

$ 8000 AFTER 97

COBB 721680
STATUS:

SR 176/MARS HILL RD FRM SR 120/DALLAS HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO PROJECT MILEAGE : 4.35 MANAGER: D. SMITH (CM)
CONTRACT TO co 8-12-93 REQ DO PE/UTL; (CO 1?11.Ev{slhil@/93 UTIL)

COBB 721685
STATUS:

MARS HILL RD FM STILESBORO RD TO SR 3/COBB P~AY RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 3.13 MANAGER: D. SMITH (CM) CONTRACT SENT 8-12-93 REQ CO DO PE & UTILITIES

FUND SOURCE: NAT'L HIGHWAY
t~~~;:;11, FEDERAL HIGHWAY ADMIN FUNDS co 124
~:~il~!~w!~TiM~!;JZt!: )'

PE 1992 ROW 1996 CONST

UNDERWAY $ 6685 AFTER 97

PE 1992 ROW 1996 CONST

UNDERWAY $ 4880 AFTER 97

COBB 72Yl25
STATUS:

NORTHSIDE PKWY@ CHATTAHOOCHEE RVR- FOR 33C $; SEE 720125 BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : 1.00 MANAGER: BEN BUCHAN LGPA NOT APPLICABLE FOR THIS PROJECT

COBB 72Y468
STATUS:

SR 6/US 278@ CSX RR - FOR "BR" FUNDS; SEE 720468 BRIDGE REMOVAL/ NEW CONSTRUCTION PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN

J ){iLANTA TIP t :A4ti~~Ilil'.
' (ciQNG DIST. 6(&{5 :
~m:;; souRcil '/.H&AcE TRANSP~lf'.
< ~~~!~t~JIW!;s:~r~E~u~~~Jieil

PE 1993 UNDERWAY

ROW 1985 UNDERWAY

CONST 1996

$ 1000

FED SHARE $ 800

GA. SHARE $

200

0TH SHARE $

ATLANTA:fip f CO 225 .

P.E NONE $

0

CONG DIST. ::._7

ROW NONE $

0

CONST 1995

$

500

FFUEDNDERASOLUHRICGEH:WABYRIDACDi~f~INfi:OFGURNADMS

FED SHARE$

400

GA. SHARE$

100

720468 IS AN ASSOCIATED PROJECT.

0TH SHARE$

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENT!:

COBB 731020
STATUS:

SR 120 LOOP /N. MARIETTA PARKWAY AT cn,.,E :,,STREET

;~~JE~~~~L,A~~~T~17 - EXIST. LANES.: 4 )#R9POSED LANES: 4

MANAGER: D.. GODWIN

MARIETTA SGN 3-11-93 FOR ROW,

OTO

ATLANTA TIP i CO 234
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL H.IGHWAY ADMIN FUNDS

COBB 751890
STATUS:

sR.176@ sR 6 Bus, MACEDONIA RPi~d6t;;GRADE s;8ij4s

INTERSECTION IMPPOVEMENT / REC~tF 1F'REHAB.

,

PROJECT MILEAGE : . 00 - EXIST) t~'Es: 2 /PROPOSED \Nii:s: 3

t~~~ ~~::R~P~iN~~D:~: 9-21-~p}

~GN 3-22-91 FOR UTi4IES.

ATLANTA TIP i CO 227
CONG DIST. 7
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

COBB 752220
STATUS:

SR 6 BUS/ELLIOTT RD it.!lI~8~ER SPRINGS CRK w OF po~liii{sPRGS REPLACEMENT OF THE EXISi{Nc; BRIDGES (S). NO ADDED.,::,Wi;:s: PROJECT MILEAGE : .00 MANAGER: D. GODWIN (M) SEND LGPA IN 1996

ATLANTA TIP i CO 247
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

COBB 752260
STATU.S:

SR 6 BUS REALIGNMENT WITH BROWNSVILLE
INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .00'- EXIST. LANES:
MANAGER: D. GODWIN POWDER SPRINGS SGN ROW & UTILITIES

co 248

FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

=:=:::\.:,..

.

COBB 752310
STATUS:

OLD CANTON RD OVER SHEFFER CK TRIBUTARY/SOPE REPLACEMENT OF THE .EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE .: 0 0 MANAGER: D. GODWIN REQ COBB DO.ROW, UTILITIES & DETOURS 9-30-93

COBB 752450
STATUS:

SR 280/SOUTH COBB DR. SIGNAL SYSTEM FM I-285 TO PAT MELL RD
SIGNALS/ SAFETY PROJECT MILEAGE : .00 - EXIST, LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE CONTACT TRAFFIC OPERATIONS

,., ATLANTA T~~}i CO 2 4 6 =:;:cONG DIST//6
FUN~ 9i'l't: BRIDc;r,: PP,Q$~/
FEDERAL diIGHWAY ADM IN ,FUNDS
~~~t.;: ,!ll:itJ'F
=;m;; souRcff ili4ifuoWN.
FED~~,JiI:i:;g'efJi.y ADMIN

COBB 770350
STATUS:

OLD DALLAS RD/CR 910 OVER MUD CREEK REPLACEMENT OF. THE EXISTING BRIDGES (S) . NO ADDED LANES,
PROJECT MILEAGE : ;oo
MANAGER: D. GODWIN
SEND LGPA IN 1995

ATLANTA \fP i CONG DIST. "6
FUND SOURCE: FEDERAL HIGHWAY

22-Feb-1994 Page 10

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW LOCL

CONST 1995

$

94

FED SHARE $

85

GA. SHARE $

9

0TH SHARE $

PE NONE

$

0

ROW 1993 UNDERWAY

CONST 1995

$

403

FED SHARE $

363

GA. SHARE $

40

.OTH SHARE $

PE 1995 ROW 1997 CONST

$

16

$

1

AFTER 97

PE 1994

UNDERWAY

ROW LOCL

CONST 1995

$

210

FED SHARE $

189

GA. SHARE $

21

0TH SHARE $

PE LOCL

ROW LOCL

CONST 1996

$

802

FED SHARE $

642

GA. SHARE $

160

0TH SHARE $

PE 1995

$

10

.ROW NONE

$

0

1995

$

866

SHARE $

866

GA. SHARE $

0TH SHARE $'

PE LOCL

ROW LOCL

CONST 1997

$

166

FED SHARE $

133

GA. SHARE $

33

0TH SHARE $

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COBB 770360
STATUS:

HIRAM RD/CR 2081 OVER POWDER SPRINGS

REPLACEMENT OF THE EXISTING BRIDGES(S).

PROJECT MILEAGE : 00

.

MANAGER: D. GODWIN

SEND LGPA IN 1995

ATLANTA TIP i CO 245
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 11

FISCAL YEAR

COST ESTS

PE LOCL

ROW LOCL

CONST 1997

$

299

FED SHARE $ 239

GA. SHARE $

60

0TH SHARE $

COBB 770370
STATUS:

FRIENDSHIP CHURCH RD/CR 942 REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: D. GODWIN SEND LGPA IN 1995

ATLANTA TIP t CO 240
CONG DIST. 6
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1997

$

127

FED SHARE $ 102

GA. SHARE $

25

0TH SHARE $

COBB 770470
STATUS:

HISTORIC DEPOT MISCELLANEOUS PROJECT MILEAGE : .00 MANAGER: STEVE YOST
TO BE DONE BY CONTRACT

ATLANTA TIP t CO 237
CONG DIST. 6
0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996

$

i56

FED SHARE $ 125

GA. SHARE $

0TH SHARE $

31

COBB 770601
STATUS:

TRAFFIC SIGNAL SYSTEM

SIGNALS/ SAFETY PROJECT MILEAGE :

. 00

-

EXIST.

LANES:

0

/PROPOSEQ :~ES.:

0

~!G!~~ ~~R!o!~Dg;~L, PE & 20%coNsTRUCTt9.~ <i~gd8C;3

COBB 770635
STATUS:

6 COBB COMMUNITY TRANSIT BUSES EQUIP. PURCHASE/ CAPITAL PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES{ MANAGER: NOT APPLICABLE

:}ATLANTA TIP t CO 249
\{hoNG DIST. 6 & 7
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
flt:~~Jli'ci- 163 FUND i1BW2f: CONG MIT .1Aik'.:dJKt FEDERAL HIGHWAY AtiMIN FtlNDS

PE 1994 $

50

ROW NONE $

0

CONST 1995 $ 950

FED SHARE $ 760

GA. SHARE $

0TH SHARE $ 190

PE NONE $
ROW NONE $ CONST 1995 $
FED SHARE $
GA. SHARE $ 0TH SHARE $

0 0 1320 1056
264

COBB 770730
STATUS:

CONCORD COVERED BR/CONCORD RD OVER NICKAJACK. CREEK BRIDGES/ ENHANCEMENT PROJECT MILEAGE : .00 MANAGER: UNKNOWN DOT WILL PROVIDE THE 20% MATCH

PE NONE $

0

ROW NONE $

0

1995 $

37

FED SHARE $

30

GA. SHARE $

7

0TH SHARE $

COBB 7D7029
STATUS:

TRANSIT COACHES, PARATRANSIT BUSES, AND PLANNING PROJECTS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: COBB COMMUNITY TRANSIT MANAGER: STEVE KISH .
INCLUDES PLANNING FUNDS

CONG DIST. 6 & 7
FUND SOURCE: FEDERAL TRANSIT

CAPITAL 1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

2736 2189
328 219

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

COBB 7D7030
STATUS:

TRANSIT COACHES, PARATRANSIT BUSES, TRANSIT l'ROJECT?, / CAPITAL FUNDS RECIPIENT: COBB COMMUNITY MANAGER: STEVE KISH INCLUDES PLANNING FUNDS

CONG. DIST, 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

COBB 7D7044
STATUS:

PUBLIC TRANSIT SERVICE TRANSIT PROJECTS/ FUNDS RECIPIENT: COBB MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST, 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

COBB 7D7045
STATUS:

PUBLIC TRANSIT TRANSIT PROJECTS FUNDS RECIPIENT: COBB COMMITT'IJT MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 6 & 7
FUND SOURCE: URBAN TRANSIT FEDERAL TRANSIT ADMIN FUNDS

COBB 7Vl014
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH

DIST. 7 & 6

COBB 7Vl015
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN COBB COUNTY MANAGER: STEVE KISH

22-Feb-1994 Page 12

FISCAL YEAR

COST ESTS

CAPITAL 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

2736 2189
328 219

OPERATING 1995

$

896

FED SHARE $ 448

GA. SHARE $

0TH SHARE $ 448

OPERATING 1996 $ 896
FED SHARE $ 448 GA. SHARE $ 0TH SHARE $ 448

CAPITAL 1995

$

67

FUND FED SHARE $

54

GA. SHARE $

6

0TH SHARE $

7

1996

$

70

FED SHARE$

56

GA. SHARE$

7

0TH SHARE$

7

,.

~

i .

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS -PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DEKALB 710323
STATUS:

BIKE/PEDESTRIAN WAY - MORELAND AVE TO S~QNE MTN PARK

BICYCLE/PED. FACILITY / ENHANCEMENT

ii'''':-.

PROJECT MILEAGE : .00 - EXIST, LANES: 0 /P.Il.QPOSED LANES: 0

MANAGER: STEVE YOST

}@ \:,

TO BE DONE BY CONTRACT, , , .. , ...,-;:,:;,,,:::::,::;:c:i;\'"\ , , , ,

ATLANTA TIP t DK 121
CONG DIST, 5 & 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 13

FISCAL YEAR

COST ESTS

PE LOCL

ROW NONE $

CONST 1996

$

FED SHARE$

GA. SHARE $

0TH SHARE$

0 1600 1280
320

DEKALB 712870

STATUS:

DEKALB 713040
STATUS:

1-20 BARRIER WALLS @i\trll~~~AGE RPS/ , RocKD,J!s[t"moN
o o ;~~c~ ~f~!~~~c~0. 10 JkxisT. LANES: /PRopdtJB itEs:
MANAGER: BILL MOSKAL SEND LGPA WHEN PROJECT IS

ATLANTA TIP t R 59
CONG DIST. 11
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 71Y870 IS AN ASSOCIATED PROJECT.

PE 1993

UNDERWAY

ROW 1995

$ 5840

CONST 1996

$ 8000

FED SHARE $ 6400

GA. SHARE $ 1600

0TH SHARE $

ATLANTA TIP t R 130
CONG DIST~ 4 & 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

30 0
10700 9630 1070

DEKALB 71307X
STATUS:

I-285 EB 49 SIGNS FM JONESBORO RD TO GLENWOOD SIGNING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: L. SEABROOK

PE NONE $

0

ROW NONE $

0

CONST 1995 $

0

FUND SOURCE: I-STATE MAINT,

FED SHARE $

rs FEDERAL HIGHWAY ADMIN FUNDS
Af~9:f5 : AN ASSOCIATED PROJECT.

GA. SHARE $ 0TH SHARE $

DEKALB 713100
STATUS:

COTILLIAN DR/SAVOY DR ONE-WAY PAIR ON EACH SIDE CONSTRUCTION OF NEW ROUTE WITH O LANES PROPOSED.
PROJECT MILEAGE : 2.02 MANAGER: UNKNOWN CONTACT TRAFFIC OPERATIONS

\:~~;~~1si~~~t DK 117

.i;6,6i.: FUND

I-STATE MAii'f{(

Fwos FEDEilii.i:i:GHWAY ADMrn

PE NONE

$.

0

ROW NONE $

0

CONST 1995

$

116

FED SHARE $ 104

GA. SHARE $

12

0TH SHARE $

DEKALB 71314X
STATUS:

COMMUNICATION CABLE ON I-85 FM I-75 N TO SR 400; SEE FULTON MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : 7.95 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE

t : ::i:1~~1s~:P 4~J,~~;~~j

~~~ ~g~~ ~

*!Ei~fil~f&;H~~t~[~ii:f' tONS*:'iiill !

0 0 0

DEKALB COMMUNICATION CABLE ON I-20 FM CAPITOL AVE TO I-285; FULTON

PE NONE $

0

71315X MISCELLANEOUS IMPROVEMENTS/ SAFETY

CONG DIST:\:5 & 11

ROW NONE $

0

PROJECT MILEAGE : 9.70 - EXIST. LANES: 0 /PROPOSED LANES: 0

CONST 1995

$

0

MANAGER: BURT RIDDLE

FUND SOURCE: CONG/Ut;i)~IR QUAL

FED SHARE$

STATUS: NOT APPLICABLE

FEDERAL HIGHWAY fil:lMIN FUNDS

GA. SHARE$

713155 IS AN Ass6c:i1\tED PROJECT.

0TH SHARE$

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMP.ROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DEKALB 713220
STATUS:

I-20@ WESTLEY CHAPEL RD RELOC FRONTAGE\~ (SNAPFINGER WOOD) INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE : .00 - EXIST. LANES: 2 ;~~()POSED LANES: 2 MANAGER: BEN BUCHAN SEND LGPA IN 1996

CONG DIST. 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 713250
STATUS:

;g iiifW I-285 SOOTH AUXILLARY LN FM SR 8 0
ob ~~~I :m~~; !:~~g~":i~EiG:E~S~ ~

MTN FWY & t:~Y BRIDGE 4 /PROPOSED JWks: 5

MANAGER: BILL MOSKAL

SEND LGPA IN 1996

CONG DIST. 4 & 11
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FONDS

22-F~b-1994 Page 14

FISCAL YEAR.

COST ESTS

PE 1995 ROW 1997 CONST

$

160

$ 1000

AFTER 97

PE 1995 ROW 1997 CONST

$

140

$ 1000

AFTER 97

DEKALB 713320
STATUS:

I-285 @ SR 8/US 29/~;Jillifi~ILLE HWY

INTERCHANGE / RECST. OR>REHAB.



PROJECT MILEAGE: .oo - ii:xtsT. LANES: o /PROPO$tbillillts: o

MANAGER: BILL MOSKAL

SEND LGPA IN 1995

CONG DIST. 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 721050
STATUS:

.Attii ::~~ ~Fsi~:EE~~:i:~NB~~GE (S) . FROM 2 LANES TO

1 ~.{

PROJECT MILEAGE : .50

MANAGER: D. GODWIN
SGN GWINNETT co 2-19-87 & DEKALB 9-10-86 toR.,QfitiiiIEs

r::i~~~~si~p 4 i DK 99
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FONDS

DEKALB 721055
STATUS:

SR 124@ YELLOW RIVER/ ALSO GWINNETT CO REPLACEMENT OF THE EXISTING BRIDGES(S). FROM 2 TO 4 PROJECT MILEAGE: .00 MANAGER: RAY METTS (CM) COUNTY SIGNED 9/10/86 FOR UTILITIES (SEE #721050)

: .~~~~~$~~fl DK 100
FUND:spfuifE: BRIC>~E PR()<;~// FEDEF\AL':C:HIGHWAY ADMINiFONDS

PE 1995 ROW 1997 CONST

$

55

$

100

AFTER 97

PE 1992 .UNDERWAY

ROW NONE

$

0

CONST 1997

$

455

FED SHARE $ . 364

GA. SHARE $

91

0TH SHARE $

PE 1992 ROW 1996 CONST

UNDERWAY

$

1

AFTER 97

DEKALB 72127X
STATUS:

SR 42/MACON HWY FM S/ANVILBLOCK RD TO OLD TONY RD/CLAYTON RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .00 MANAGER: M . REYNOLDS
DEKALB COUNTYSIGNED 7/14/89 FOR UTILITIES (SEE #712270)

DEKALB 721330
STATUS:

SR 124/ROCK CHAPEL RD FM UNION GR RD N TO PLEASANT HILL RD RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : .90 MANAGER: D. GODWIN (M) DEKALB SGN 9-2-88 FOR UTILITIES.

PE 1992 UNDERWAY

ROW 1992

UNDERWAY

i~i~.:i~;~;i:~~!~:~ii;i~f // i;: i::~ ..:,:::'tONST 1995

$

0

$

$

$

ATLANTA itI> i DK 84
CONG DIST. 4
FFUEDNDERASOL UHRICGEH:WANYA TA'Dt iMl l GINH WFOANYDS

PE 1993 ROW 1996 CONST

UNDERWAY $ 1481 AFTER 97

~

lh.J.i .. w3

~

,...:.------'!

COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DEKALB 721350
STATUS:

SR 12/COVINGTON HWY FM_ SR 124 E TO RECONSTRUCTION & WIDENING FROM 2 LANES PROJECT MILEAGE : 1.20 MANAGER: D. CHURCH (M) COUNTY SIGNED 9-2-88 FOR UTILITIES

ATLANTA TIP t DK 30
CONG DIST. 11
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 15

FISCAL YEAR

COST ESTS

PE 1992 ROW 1997 CONST

UNDERWAY $ 3675 AFTER 97

DEKALB 721530
STATUS:

SR 124 FM ROCKBRIDGE RD TO RECONSTRUCTION & WIDENING--~~
PROJECT MILEAGE : 4.10 MANAGER: RAY METTS REQ DEKALB DO UTIL

DEKALB 721535
STATUS:

SR 124 FM PLEASANT RECONSTRUCTION & PROJECT MILEAGE : 2.92 MANAGER: D. GODWIN REQ DEKALB CO DO UTILITIES

ATLANTA TIP t GW 76
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL.HIGHWAY ADMIN FUNDS 72153X IS AN ASSOCIATED PROJECT.
ATLANTA TIP t DK 85
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1997 CONST
PE 1993 ROW 1996 CONST

UNDERWAY $ 6737 AFTER 97
UNDERWAY $ 2327 AFTER 97

DEKALB 721880
STATUS:

US 78/STONE MOUNTAIN FWY N GATE INTERCHANGE @ STONE_.,i4fi::

:!~: ;:;;~~~~~~E{G:E~S~400~

LANES: 4 /PROPOSEP ll.AAt: 4

MANAGER: NEIL DAVIS

DEKALB SGN 5-25-93 FOR PUBLIC UTILITIES

r: l!;~;~s~:p4t DK-R 117
\\/::;UNO SOURCE: NAT' L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS
)i21aa:2 IS AN ASSOCIATED PROJECT.

DEKALB 730970
STATUS:

SR 212/BROWNS MILL RD@ POLE BRIDGE CRK

-:

REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

PROJECT MILEAGE : .00

MANAGER: D. GODWIN

REQ DEKALB COUNTY DO UTILITIES 5-10-91

:;:;~;~si~fi* DK 98 ::::;:::::::;..
FUND :~&&flfi:: BRIDGE PROG~? ;
FED:efilu:;iiiGHWAY Ab~IN\ftii4os

DEKALB 751340
STATUS:

CR 23/FAYETTEVILLE RD@ SUGAR CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .50 MANAGER: D. GODWIN SIGNED BY DEKALB COUNTY 12-5-86 FOR R/W & UTILITIES

., k~TA TIP t oid1iF
/toNG DIST. 11:)}{ --
=;Jtb SOURcii nm~GE PROGRAM
FEDB;gAJ:.,itJtj~WAY ADMIN

DEKALB 751370
STATUS:

CHAMBLEE-TUCKER RO FM NEW P'TREE RD TO BUFORD HWY/SR 13 RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES. PROJECT MILEAGE : 1.40
MANAGER: D. GODWIN REQ CO DO ROW & UTIL 2-21-90; CHAMBLEE NOT APPLICABLE

ATLANTAfjP t
CONG DIST .-.;.-4
FUND SOURCE: FEDERAL HIGHWAY

PE 1993 UNDERWAY

ROW 1994 $

10

CONST 1995 $ 2513

FED SHARE$ 2010

GA. SHARE$ 503

0TH SHARE.$

PE 1993 UNDERWAY

ROW 1995

$

10

_CONST 1996

$

498

FED SHARE $ 398

GA. SHARE $

100

0TH SHARE $

PE 1993 UNDERWAY

ROW LOCL

1995 $ 421

FED SHARE$ 337

GA. SHARE$

84

0TH SHARE$

PE 1993 UNDERWAY ROW 1995 $ 3356 CONST 1996 $ 2500
FED SHARE $ 2000 GA. SHARE $ 500 0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DEKALB 751380
STATUS:

CHAMBLEE-TUCKER RD FM I-85 TO I-285 "' RECONSTRUCTION & WIDENING FROM 2 LANES 't(>:cc. 4 LANES.

PROJECT MILEAGE : 1.30

- ~~::~/s~f~~!~

#M~. UTILITIES , $600, 992

ROW cosT

ATLANTA TIP i DK 17
CONG DIST. 4
FUND SOURCE: I-STATE CONST. FEDERAL HIGHWAY ADMIN FUNDS
.,.

DEKALB 751440
STATUS:

WINTERS CHAPEL RD FM OAKCLIFF RD 4~:;~)ca~COPEE ru:i(i ~IGNAL)

CONSTRUCTION OF NEW ROUTE WITli:=4{t$NES PROPOSED. .. :

PROJECT MILEAGE : 90

... ... .



ufffl ~~:R~G~ 6~~~=89 ROW &

&( 2';'

.>ST (T&~ ~~OJECT

ATLANTA TIP i DK 44
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 75Y440 IS AN.ASSOCIATED PROJECT.

22-Feb-1994 Page 16

FISCAL YEAR

COST ESTS

PE 1993

UNDERWAY

ROW 1993 UNDERWAY

CONST 1995 $ 5009

FED-SHARE $ 4258

GA. SHARE $' 751

0TH. SHARE $

PE 1992 UNDERWAY ROW LOCL
CONST 1995 $ 6610 FED SHARE$ 5288 GA. SHARE$ 1322 0TH SHARE$

DEKALB 751445
STATUS:
DEKALB 751490
STATUS:

WINTERS CHAPEL-OAK:~:;~~:Jl%f CONN @ SOUTHERN RR
BRIDGES / RECST. OR REHfil{( PROJECT MILEAGE : .00
~~~~:~DG~/~g~:9 ROW & UT~if~fi!:s. SEE

ATLANTA TIP i DK 94
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS 751440 IS AN. ASSOCIATED PROJECT.

SR 859/COOLEDGE-BROCKETT RD FM E PONCE DE

f~; ATLANTA TIP i DK 79

RECONSTRUCTION & WIDENING FROM 4 LANES TO

:( i@ONG DIST. 11

PROJECT MILEAGE,: .30

MANAGER: D. GODWIN

FUND SOURCE: SURFACE-TRANSPORT.

DEKALB SGN 3-5-90 .FOR UTIL AND WILL MAINTJ\::j:~. vfliiti'i26MPLETED .

FEDERAL HIGHWAY ADMIN FUNDS
:::::.

PE 1992

UNDERWAY

ROW NONE

$

0

CONST 1995 $ 1996

FED SHARE $ 1796

GA. SHARE $ 200

0TH SHARE $

PE 1993 UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$ 1307

FED SHARE $ 1046

GA. SHARE $ 261

0TH SHARE $

DEKALB 751495
STA1US:
DEKALB 751940
STATUS:

SR 859/COOLEDE-BROCKETT RD FM STONE MTN FWY-SR iftw
RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: 1.00 MANAGER: D. GODWIN
SEE STP-9223 (3), _PI #751490

. ATLANTA Tffi\t DK 7 9 )/coNG DisTL4 & 11
FFEUDNEoim::aJ:brG~HtfW: ASYURFAABCEM. rTnRtttmJronsMfFF>

PE 1996 ROW CONST

$

42

AFTER 97

AFTER 97

CR 5109/STEPHENSON RD@ CROOKED CRK

l ~~~si~P .. : '. :/!1

! ol

REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.

1

PROJECT MILEAGE: .00 MANAGER: D. GODWIN

FUND SOURcii::: ma~GE

DEKALB_SGN DO ROW, UTILITIES & NECESSARY DETOURS 6-16-92

FEDE . W.AY ADMI

::j,J/\

PE 1991 UNDERWAY

ROW LOCL

/C:OtlST 1995 $ 272

FED SHARE$ 218

GA. SHARE$

54

0TH SHARE$

DEKALB EAST PONCE DE LEON AT RAYS ROAD 752100 INTERSECTION IMPROVEMENT/ RECST. OR REHAB.
: PROJECT MILEAGE : .00 - EXIST. LANES: 2 /PROPOSED LANES: 2 MANAGER: D, GODWiN
STATUS: DEKALB SIGNED ROW AND UTILITIES 11-12-92

ATLANTA TIP i DK102 CO,, N-G DIST. 4
FUND SOURCE: HWY FEDERAL HIGH~AY

PE 1993 UNDERWAY ROW LOCL CONST 1995 $ 158
FED SHARE$ 142 GA. SHARE $ _16 0TH SH/:\P.8 $

_I

=

m:rrmn

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DEKALB 752470
STATUS:

SR 236/LAVISTA RD AT RANCHWOOD TURN LANES/ SAFETY PROJECT MILEAGE : .16 - EXIST. LANES: MANAGER: D. GODWIN CONTACT TRAFFIC OPERATIONS

ATLANTA TIP f DK 119 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 752480 STATUS:

SR 155/CANDLER RD FM co:Lu1~BJCA/Sfu%ff~f}1~1\:;~,00 SIGNALS/ SAFETY PROJECT MILEAGE : 3.60 MANAGER: BURT RIDDLE
CONTACT TRAFFIC

ATLANTA TIP f DK 120
CONG DIST. 11
FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

DEKALB 752500
STATUS:

SR 260/GLENWOOD RD SIDEWALKS / sAFETY PROJECT MILEAGE : .33 MANAGER: D. GODWIN NOT APPLICABLE

CONG DIST. 11
0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

. DEKALB 752510
STATUS:

SR 236/LAVISTA ROAD AT RANCHWOOD DRIVE &
INTERSECTION IMPROVEMENT/ SAFETY PROJECT MILEAGE : .16 - EXIST. LANES: 0 MANAGER: D. GODWIN CONTACT TRAFFIC OPERATIONS

DIST. 4
FUND SOURCE: HWY. SAFETY F~D~RAL. HIGHWAY ADMIN FUNDS

DEKALB 770440
STATUS:

PEDESTRIAN/LANDSCAPING ALONG US 278 IN AVONDALE BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED MANAGER: UNKNOWN TO BE DONE BY CONTRACT

DEKALB 770480
STATUS:

SOUTH DECATUR TROLLY LINE CONVERSION BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: STEVE YOST TO BE DONE BY CONTRACT

DEKALB 770530
STATUS:

D'TOWN ST'SCAPES IN DECATUR;SIDEWALKS,X-WALKS,BENCHES,TREES MISCELLANEOUS IMPROVEMENTS/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: UNKNOWN TO BE DONE BY CONTRACT

!!ii~~~~si~p4~&, :fr6
tffub souRc&J ~s. ENHANCE.
FED~~ i-If~ij\'lAY ADMIN
ATL~::111::f
CONG DIST. 4
FUND SOURCE: FEDERAL HIGHWAY

,..

22-Feb-1994 Page 17

FISCAL YEAR

COST ESTS

PE 1994 UNDERWAY

ROW 1995

$

10

CONST 1996

$

40

FED SHARE $

36

GA. SHARE $

. 4

0TH SHARE $

PE 1995 $

15

ROW NONE

$

0

CONST 1995

$

469

FED SHARE $

469

GA. SHARE $

0TH SHARE $

PE NONE

$

0

ROW LOCL

CONST 1997

$

30

FED SHARE $

27

GA. SHARE $

3

0TH SHARE $

PE NONE

$

0

ROW LOCL

CONST 1997

$

48

FED SHARE $

43

GA. SHARE $

5

0TH SHARE $

PE LOCL

ROW LOCL

CONST 1995

$

90

FED SHARE $

72

GA. SHARE $

0TH SHARE $

18

PE LOCL

ROW LOCL

1996

$

625

FED SHARE $

500

GA. SHARE $

0TH SHARE $

125

PE LOCL

ROW LOCL

CONST 1995

$

750

FED SHARE $

600

GA. SHARE $

0TH SHARE $

150

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATT.ON DRAE"r STATE TRANSPORTATION IMPROVEMENTS ,rOGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

DEKALB 770603
STATUS:

TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN SIGNALS/ SAFETY PROJECT MILEAGE : .00 MANAGER: BURT RIDDLE
REQ DEKALB DO ROW,. UTIL, PE

LANES: 0

ATLANTA TIP i DK 118
CONG DIST. 4 & 11
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

t:t.~i"c,.t}-J.!/114
Page 18

FISCAL YEAR

COST ESTS

PE 1994

$

ROW NONE $

CONST 1995 $

FED SHARE $

GA. SHARE $

0TH SHARE $

50 0
1108 886
1 221

DEKALB' 77063Z
STATUS:

REGIONAL RIDESHARE PROGRAM; RIDE SHARING/ OTHER PROJECT MILEAGE : .00 MANAGER: UNKNOWN NOT APPLICABLE

PE NONE $

0

CONG DIST. 5 & 4

ROW NONE $

0

0

CONST 1996 $

0

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE$

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

. 0TH SHARE $

DEKALB 7D701X
STATUS:

TRANSIT TRAVELER TRANSIT PROJECTS FUNDS RECIPIENT: CITY MANAGER: STEVE KISH

CONG DIST. 5

.CAPITAL 1996

$

0

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE$

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

0TH SHARE$

DEKALB 7Vl017
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN MANAGER: STEVE KISH

DIST. 4 & 11

CAPITAL 1995

$ 104

SOURCE: ELDERLY & DISABLED FUND FED SHARE$

83

~~.~~A.L. TRANSIT ADMIN FUNDS

GA. SHARE$

11

0TH SHARE$

10

DEKALB 7Vl018
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT
TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DEKALB COUNTY
MANAGER: STEVE KISH

1996

$ 107

FED SHARE$

86

GA: SHARE $

10

0TH SHARE$

11

~,--... ~
...

, .... ... -~ \ 0 .r.-

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 19

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

------------------------------------------------------------------------------------------ ----------------------------------------

DOUGLAS SR 92 EXT/DOUGLASVILLE FM SR

ATLANTA TIP f DO 2

PE 1996

$

150

720970 BRIDGES/ RECST. OR REHAB.

CONG DIST. 7

ROW

AFTER 97

PROJECT MILEAGE : 1.20

CONST

AFTER 97

MANAGER: BILL MOSKAL (M)

FUND SOURCE: SURFACE TRANSPORT.

STATUS: CITY OF DOUGLASVILLE SIGNED

FEDERAL HIGHWAY ADMIN FUNDS

DOUGLAS 721320
STATUS:

BANKHEAD HWY FM SWEETWATER RECONSTRUCTION & WIDENING PROJECT MILEAGE : 1.30 MANAGER: D. SMITH SEND LGP~ WHEN PROJECT

ATLANTA TIP f DO 16 CONG DIST. 7
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 ROW 1997 CONST

UNDERWAY
$ 1450 AFTER 97

DOUGLAS 721435
STATUS:

SR 5/BILL ARP RD@ REPLACEMENT OF THE PROJECT MILEAGE : .50 MANAGER: D. GODWIN DOUGLAS COUNTY REFUSED

DOUGLAS 721470
STATUS:

SR 5 N&SB FM S/SWEETWATER RD ADDITION OF A PASSING LANE. PROJECT MILEAGE: 1.75 MANAGER: D. GODWIN DOUGLAS COUNTY SIGNED 12/19/89

DOUGLAS 742800
STATUS:

LOWER RIVER RD FM SR 92 TO CAMP CREEK RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 6.30 MANAGER: K FULBRIGHT (M) SEND LGPA WHEN PROJECT IS ADDED TO CWP

ATLANTA TIP f 0042
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW 1994

$

1

CONST 1995

$ 1759

FED SHARE $ 1407

GA. SHARE $

352

0TH SHARE $

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

S~~~if i: ) ;~~;~

&D~ 21

Blst F~:i;

SURFACE TRAiiitsJi::>

fo~os FEoEiw 'HIGHWAY ADMIN

PE 1992

UNDERWAY

ROW 1993 UNDERWAY

CONST 1995

$

790

FED SHARE $

632

GA. SHARE $

158

0TH SHARE $

PE 1996
ROW LOCL CONST

$

250

AFTER 97

DOUGLAS 'DOUGLAS BLVD EXT FM CR 814 TO CR 115 751820 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : 1.80 MANAGER: J. GARLAND (M) STATUS: SEND LGPA WHEN PROJECT IS ADDED TO CWP

$

103

AFTER 97

DOUGLAS 751825
STATUS:

DOUGLAS BLVD EXT FM CR 142 TO CR 814 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.00 MANAGER: J. GARLAND (M) SEND LGPA WHEN PROJECT IS ADDED TO CWP

ATLANTA flp f DO 31
CONG DIST. -,:7

ADMIN FUND SOURCE: SURFA2kji4~SPORT.

FEDERAL HIGHWAY

FUNDS

PE 1996 ROW LOCL CONST

$

103

AFTER 97

GEORGIA DEPARTMENT OF TRJ\NSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 20

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P .I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

----------------------------------------------------------------
DOUGLAS CR 24/N BURNT HICKORY RD@ GOTHARD

.---------A-T-L-A-N-T-A--T-I-P--i--D-O--4-1---------------------P-E---1-9-92------U-N-D-ER-W--AY

751970 REPLACEMENT OF THE EXISTING BRIDGES($).

CONG DIST. 7

ROW LOCL

PROJECT MILEAGE : .00

CONST 1995 $ 386

MANAGER: D'. GODWIN

FUND SOURCE: BRIDGE PROGRAM

FED SHARE$ 309

STATUS: DOUGLAS COUNTY SIGNED ROW, UTIL &

FEDERAL HIGHWAYADMIN FUNDS

GA. SHARE$

77

0TH SHARE$

DOUGLAS 770162
STATUS:

CR 39/0LD ALABAMA RD@ REPLACEMENT OF THE EXISTING ~~-~~-~~,w PROJECT MILEAGE: .00 MANAGER: D. GODWIN
DOUGLAS COUNTY SGN DO

ATLANTA TIP i DO 39
CONG DIST. 7
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1992 UNDERWAY ROW LOCL CONST 1996 $ 644
FED SHARE$ 515 GA. SHARE$ : 129
0TH SHARE$

DOUGLAS 7B1394
STATUS:

COUNTY OPERATED

TRANSIT FACILITIES/

FUNDS RECIPIENT: DOUGLAS

MANAGER: STEVE KISH

.

CONG DIST. 7

OPERATING 1995 $

18 .

FUND SOURCE: RURAL TRANSIT

FED SHARE$

66

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE$

18

DOUGLAS 7B1395
STATUS:

COUNTY OPERATED PUBLIC VANPOOL SERVICE TRANSIT FACILITIES/ OPERATIONS FUNDS RECIPIENT: DOUGLAS MANAGER: STEVE KISH

DOUGLAS 7D7032
STATUS:

TRANSIT PROJECT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: DOUGLAS COUNTY MANAGER: STEVE KISH LGPA NOT APPLICABLE

}/:'::cc1NG DIST_ . 7

OPERATING 1996 $

18

FUND SOURCE: RURAL TRANSIT
fED~~ TRANSIT ADMIN FUNDS

FED SHARE$

68

GA. SHARE $

0TH SHARE$

18

11

:::::: DIS~l ~

. ..;,

!:~~~s~~~Mi~ti~~) :... .CAPITAL 1995

$

FED SHARE$

GA. SHARE$

211 1_69
21

0TH SHARE$

21

DOUGLAS CAPITAL PROJECT 7D7033 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: DOUGLAS - COUNTY
MANAGER: STEVE KISH
STATUS: LGPA NOT APPLICABLE

:llig;:G DIST. 7.

:-:::::::-:::-

'

....

iwo souRcif:&il~

FEDERAL TRANSIT

1996

$

211

FED SHARE$

169

GA. SHARE$

21

0TH SHARE$

21

DOUGLAS 7V1020
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DOUGLAS COUNTY MANAGER: STEVE KISH

CO~G DIST. ''''7
FUND SOURCE: FEDERAL TRANSIT

CAPITAL 1995

$

11

FUND FED SHARE $

9

GA. SHARE $

1

0TH SHARE $

1

'

-

~

~

I&.:~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 21

FISCAL YEAR

COST ESTS

DOUGLAS 7V1021
STATUS:

ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN DOUGLAS MANAGER: STEVE KISH

CONG DIST. 7

CAPITAL 1996

$

12

FUND SOURCE: ELDERLY & DISABLED FUND FED SHARE$

10

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

GEORGIA DEPAR'l'MENT OF TRANSPORTATION

LL-~eo-1~:,q

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 22

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

F-A--Y-E-T-T-E---S-R--54-F-M--M-C-D-O-N-O-U-G-H--R-D--N-E--T-O--S-R--7-/-U-S--------------------c-o-.---------A-T-L-A-N-T-A--T-I-P--i--C--L-4-1-/F-Y-1-0------------------PE---1-9-9-6-----$-----1-44

721440 RECONSTRUCTION & WIDENING FROM 2 LANES

CONG DIST. 3

ROW

AFTER 97

-PROJECT MILEAGE : 5.53

CONST

AFTER 97

MANAGER: M. REYNOLDS (M)

FUND SOURCE: NAT'L HIGHWAY

STATUS: REQ ~LAYTON DO UTIL 4-23-92; FAYETTE

FEDERAL HIGHWAY ADMIN FUNDS

72144X IS AN ASSOCIATED PROJECT.

\

~

C!l!:ll':Ml

~

~:~
t

.....1.,.a , --.-,.

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 712360
STATUS:

I-285@ WASHINGTON RD/INCL WDN WASHINGTQ_RD 600' W OF BR

INTERCHANGE / RECST. OR REHAB.

-: : : -_

PROJECT MILEAGE : . 00 - EXIST. LANES: 4 )t:RQPOSED LANES: 5

MANAGER: BILL MOSKAL

SIGNED CITY OF EAST POINT 3-16-87 FOR

ATLANTA TIP i FS 17
CONG DIST. 5
FUND SOURCE: I-STATE MAINT, FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 23

FISCAL YEAR

COST ESTS

PE 1988

UNDERWAY

ROW 1991

UNDERWAY

CONST 1996

$ 1651

FED SHARE $ 1486

GA. SHARE $

165

0TH SHARE $

FULTON 712940

I-75@ MT PARAN ROAD
PINRTOEJRECCHTANMGILEEA/ GEREC: ST. 0. 0OR- EREXHISA'Bl'.) t--J--W-----E---S---: O /PROPOSED J..:.].i..t,E_;,:_S: O

STATUS: =A1~~;A ~gs;TIL 8-2471;:}i f&fi~N N/A

ATLANTA TIP i R 105
CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW 1995

$

500

CONST 1995

$ 2200

FED SHARE $ 1760

GA. SHARE $ 440

0TH SHARE $

FULTON 712950
STATUS:

;:~~~~~i~E~G~~s~oo ~i~~: I-85 @ MONROE DRI:/' 0::

LANES: 0 /PROPOs~$:~Is: 0

cotAffi t;k7
=A1~~~;A ~gs;TILITIEs 0:1'1+~?:l?!,,:X.ON

ATLANTA TIP i R 106
CONG DIST. 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL -HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW 1995

$

50

CONST 1996

$ 2200

FED SHARE $ 1760

GA. SHARE $

440

0TH SHARE $

FULTON 71297Z
STATUS:
FULTON 713030
STATUS:

HOV LUMP SUM SIGNING ON I-75 & I-85 METRO HOV LANES/ SAFETY PROJECT MILEAGE : -.00 - EXIST. LANES: 0 MANAGER: BURT RIDDLE

FUND SOURCE: I-STATE MAINT,

FEDERAL HIGHWAY ADMIN FUNDS

4l2~}(fts AN ASSOCIATED PROJECT.

,,-.

)

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1995 $

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE FOR DESIGN OF NEW I-285 SR 400 INTERCHANGE

:rift INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : ,00 - EXIST,

LANES:

8

/PROPOSED

LANES:

MANAGER: NEIL DAVIS (CM)

SEND LGPA WHEN CONSTRUCTION PHASE IS ADDED

PE 1995

.tcoNG Dis-rl :;

__ :: __ _

;ibJhM - FUN~:$8t.ffi8~: DEMONSTRATf(M

ROW NONE CONST NONE

FEDERAL(ifi:GHWAY ADMIN

$ 2000

$

0

$

0

FULTON 713075
STATUS:

I-285 EB, 40 SIGNS FM JONESBORO RD TO GLENWOOD RD . DEKALB SIGNING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: L. SEABROOK NOT APPLICABLE

FULTON 713080
STATUS:

I-285 NB .. 11,255 SQ FT SIGN REHAB FM MP 1.0 TO I-20 SIGNING/ MAINTENANCE PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE NOT APPLICABLE

PE NONE $

0

ROW NONE $

0

-:.:-c<CONST 1995 $

FUND SOURC:if}ll~TATE MAINT.

FED SHARE$

> FED~-~ Jt:i.:_q#,WAY ADMIN FUNDS:; t:

GA. SHARE$

256 256

71307J(:ts:~ ASSOCIATED PRCi.Jtct:

-. ....

.<-=:-:-::_:

0TH SHARE$

l h ATLANTA

i R 130 _, .( ; :

CONG DIST. -":5

FUND SOURCE: I-STii:~k::1:~~T. FEDERAL HIGHWAY ADMI~ FUNDS

PE NONE $

0

ROW NONE $

0

CONST 1995 $ 286

FED SHARE $ 286

GA. SHARE $

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

FULTON 713085
STATUS:

I-20 WB 61 SIGNS FROM SIGNING/ MAINTENANCE PROJECT MILEAGE : .00 MANAGER: L. SEABROOK NOT APPLICABLE

EXIST.

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
ATLANTA TIP i R 130
CONG DIST. 5
FUND SOURCE: I-STATE.MAINT. FEDERAL HIGHWAY ADMIN FUNDS

FULTON 71309Z
STATUS:

I-85 NB 62 SIGNS FROM I-285 IGNING / MAINTENANCE PROJECT MILEAGE : 00 MANAGER: L. SEABROOK

FULTON 713125
STATUS:

20 VARIABLE MESSAGE SIGNING/ SAFETY PROJECT MILEAGE : .00 MANAGER: BURT RIDDLE
NOT APPLICABLE

ATLANTA TIP i R 130
CONG DIST . 5
FUNDSOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 713090 IS AN ASSOCIATED PROJECT.
ATLANTA TIP i R 166
CONG DIST. 5
0
FOND SOURCE: CONG MIT. /AIR QUAL. FEDERAL HIGHWAY ADMIN FUNDS

FULTON 713137
STATUS:

I-75 COMMUNICATION CONDUIT & CABLE FM I-85 TO
MISCELLANEOUS IMPROVEMENTS/ SAFETY
PROJECT MILEAGE: 2.55 - EXIST. LANES: o /PROPoszb}ii&is: o
MANAGER: BURT RIDDLE
NOT APPLICABLE

:.
/&,NG DIST. 5
\ ;UNO SOURCE: CONG MIT./AIR QOAL FEDERAL HIGHWAY ADMIN FONDS

FULTON 713140
STATUS:

COMMUNICATION CABLE ON I-85 FM I-75 NORTH MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : 2.97 - EXIST. LANES: 0 /PROPOSED MANAGER: BURT RIDDLE NOT APPLICABLE.

g/IIJ : ATLANTA Ttitt R 168 ::coNG oI_stW , 5

_

~:~~i~!~wi~Ni:~~;~~!!~8tiA

FULTON 713142
STATUS:

COMMUNICATION CABLE ON I-85 FM SR 400 NORTH TO I-285/DEKALB MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : 7.95 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE NOT APPLICABLE

22-Feb-1994 Page 24

FISCAL YEAR

COST ESTS

PE NONE $

ROW NONE $

CONST 1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0
363. 363

PE }'0~11":

$

0

ROW :-:,, 'l-~

$ .

0

CONST l'ES

$

0

FED SHARE$

GA. SHARE$

0TH SHARE $.

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $ GA. SHARE $ 0TH SHARE $

0 0 7520 6016 1504

PE NONE

$

ROW NONE $

CONST 1995 $

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 2300 1840 460

PE NONE $ ROW NONE $
CONST 1995 $
FED SHARE $ GA. SHARE $ 0TH SHARE $

0 0 1700 1360 340

0
0 5300 4240 1060

FULTON 713147
STATUS:

I-75 COMMUNICATION CABLE ON I-75 FM NORTHSIDE DR TO I-285 MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .-7 .13 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE NOT APPLICABLE

CONG DI:::5 & 6
FUND SOURCE: CONG~ff:1/~IR QUAL FEDERAL HIGHWAY ADMiNFUNDS 71314X IS AN ASSO\:fJ:A~ED PROJECT.

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
1062 850
212

I.

~

d'-3~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 713150
STATUS:

COMMUNICATION CABLE ON I-75 FROM I-285 ~.ORTH TO I-85 MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : 6.00 - EXIST. LANES: 0 :::!PROPOSED LANES : 0
MANAGER: BURT RIDDLE NOT APPLICABLE

ATLANTA TIP# R 170 CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

:1;&. FULTON COMMUNICATION CABLE I-20 FROM r.iif!ILAPITOL

713155 MISCELLANEOUS IMPROVEMENTS / SAf'tf'.f'}

PROJECT MILEAGE : 6. 71 EXIST/::'f:Jillts: 0 /PROPOSED

0

MANAGER: BURT RIDDLE

STATUS: NOT APPLICABLE

CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS 71315X IS AN ASSOCIATED PROJECT.

FULTON 713157
STATUS:

COMMUNICATION CABLE ilJat{oM CAPITOL AVENUE TO I+.Jes16EKALB MISCELLANEOUS IMPROVEMENTS./ SAFETY PROJECT MILEAGE : 9.70 - EXIST. LANES: 0 /PROPO$itrmES: 0 MANAGER: BURT RIDDLE NOT APPLICABLE

CONG DIST. 11 & 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

FULTON. 713230
STATUS:

I-285@ RIVERSIDE DR; TURN LANES & BRIDGES/ RECST. OR REHAB. PROJECT MILEAGE : .00 MANAGER: BEN BUCHAN SEND LGPA IN 1995

DIST. 5-_
FUND SOURCE: I-STATE MAINT. FEDER.AI, HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 25

FISCAL YEAR

COST ESTS

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 2100 1680 420

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 4400 3520
880

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0
0 6400 5120 1280

PE 1995 ROW 1996 CONST

$

130

$ 1000

AFTER 97

FULTON 713330
STATUS:

I-285 SOUTH TO I-20 WEST RAMP GEOMETRY WEST .OF
;-:~~T~i~iAG~R:~~_: EXIST. LANES: 2 /PROPOSED LANEsi:rn<t MANAGER:D. SMITH SEND LGPA IN 1996

FULTON 720570
STATUS:

BANKHEAD HWY/SR 8 FM PROCTOR CRK TOE OF SCL RR BRIDGE RECONSTRUCTION & WIDENING. NO LANE ADDITION PROPOSED. PROJECT MILEAGE : .44 MANAGER: BILL MOSKAL (M) CITY OF ATLANTA SIGNED 9/6/89 FOR UTILITIES

FULTON 720980
STATUS:

SR 138/ RELOC FM 5 LN@ BETHSAIDA RD TO SR 279/0'NATL HWY RECONSTRUCTION & WIDENING FROM 2 LANES TO 5 LANES.
PROJECT MILEAGE : 2.87 MANAGER: D. GODWIN DOT TO PAY UTILITIES 8-27-92

!Iil~~;~si~P 5!:ftf'::::~i!i
:dko SOURct'f!J1'.~ L
FEDERAL .li!C;J!.WAY AOMIN
1
ATL~:~: ] ~: f CONG DIST . ..,6
FUND SOURCE: FEDERAL HIGHWAY

PE 1995 ROW 1997 CONST

$

50

$

100

AFTER 97

PE 1993 ROW 1997

sUNDERWAY 1104 AFTER 97

PE NONE

$

0

ROW 1990 UNDERWAY

CONST 1995

$ 6616

FED SHARE $ 5293

GA. SHARE $ 1323

0TH SHARE $

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 26

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

-------------------------------------------------------------------------------------------------- .--------------------------------

FULTON STATE BRIDGE RD FM ALPHA CT/SR 400 TO PAJ:U< BR PKWY

ATLANTA TIP i FN 15

PE NONE

$

0

720990 RECONSTRUCTION & WIDENING FROM 2 LANES 19:4 LANES.

CONG DIST. 6

ROW 1992

UNDERWAY

PROJECT MILEAGE-: 2.14

CONST 1996

$ 8998

MANAGER: NEIL DAVIS

FUND SOURCE: SURFACE TRANSPORT.

FED SHARE $ 7198

STATUS: REQ FULTON ROW/UTIL 12/92;ALPHARETTA $G~liBWl~uB UTL 2/93

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $ 1800

0TH SHARE $

Ai;.t%f~ FULTON SR 9 @ C' HOOCHEE RVR/ INCL INT @

RIVERSI~i:i 72Y460

721460 REHAB. OF THE EXISTING BRIDGE ($.)lrtioM 4 LANES TO BLANES.

STATUS: ~~i~~~~:~~fa~~;lcOqNj~i~;~B UTIL 12-2-91

FULTON 721510
STATUS:

.A SR 120/ALPHARETTA FM'ik'.J)i'.mIN ST EASTERLY TO SR
RECONSTRUCTION & WIDENil'IG>FROM 2 LANES TO 6 PROJECT MILEAGE : 1.33 MANAGER: NEIL DAVIS (C) REQ CITY OF ALPHARETTA DO

ATLANTA TIP i FN 7 CONG DIST. 6
FUND_ SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 72Y460 IS AN. ASSOCIATED PROJECT.
ATLANTA TIP i FN 16 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS. 72Y510 IS AN ASSOCIATED PROJECT.

PE 1993 ROW 1996 CONST

UNDERWAY $ 1473 AFTER 97

PE 1993 UNDERWAY

ROW 1994

UNDERWAY

CONST 1996 $ 3900

FED SHARE $ 3120

GA. SHARE $

780

0TH SHARE $

FULTON 721560
STATUS:

~c~!,~!u~iI;~ ~Rw~~!N~~~F:o~L~P~!!T~oT~ ~;!~FJ'a1:~k~
~;!i~:M~~E~~w~/. 60
DOT WILL PAY UTILITIES 11-10-92

FULTON 721750
STATUS:

SR 3/NORTHSIDE OR@ BANKHEAD HWY; @ NORTH AVE;@ ..i-1ARIETTA

INTERSECTION IMPROVEMENT / RECST. OR REHAB.

.

:t PROJECT MILEAGE : 7 5 - EXIST. LANES: 2 /PROPOSED LANES_f:
=A~~~~/:T~~! & FULTON co 00 PUBLIC UTIL . 9-20-91

FULTON 721790
STATUS:

SR 9/S MAIN ST FM UPPER HAMBREE RD TO ACADEMY ST RECONSTRUCTION & WIDENING FROM 2 .LANES TO 4 LANES.
PROJECT MILEAGE. : 1. 70 MANAGER: NEIL DAVIS (CM) ALPHARETTA TO BUY ALL ROW OVER $1, 598.. SEND LGPA IN 1996

Ti; @;~~~si~P5i FS 31

(: :UNO SOURCE: SURFACE TRANSPORT. f~D.E:RAL HIGHWAY ADMIN FUNDS
t~~~;:;'li AT 76

FUN~0~6ik8[ NAT'L HIGHWA;j)U

FEoEfill.t HIGHWAY ADMIN t@bs

-

..::'...::.;-:

PE NONE $

0

ROW 1992

UNDERWAY

CONST 1995 $ 5064

FED SHARE $ 4051

GA. SHARE $ 1013

0TH SHARE $

PE 1993 UNDERWAY

ROW 1994

$ 1430

CONST 1995

$ 1130

FED SHARE $

904

GA. SHARE $ 226

0TH SHARE $

,1j;i~~ts~:.~i,1;1fil*

PE 1993 ROW 1997

/< FUND SOURciT. si!:CE TRANs~JJ4}

CONST

FEDERAL H!Gll.WAY ADMIN FUNDS/' ..

UNDERWAY $ 1598 AFTER 97

FULTON 721810
STATUS:

SR 166/LAKEWOOD FWY@ GREENBRIAR PKWY/CAMPBELLTON RD MI.9.37 INTERCHANGE/ RECST. OR REHAB. PROJECT MILEAGE: .00 - EXIST. LANES: 2 /PROPOSED LANES: 2
MANAGER: D. CHURCH (M) SEND LGPA WHEN PROJECT IS ADDED TO CWP

ATLANTA f'tg i AT 62
CONG DIST. 5

AD~IN FUND SOURCE: NAT 1 i'tfda~AY

FEDERAL HIGHWAY

FUNDS

PE 1995 ROW
CONST

$ 198 AFTER 97 AFTER 97

l!D=i:.J

~

~

~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 721840
STATUS:

FREEDOM PKWY/SR 10 FM I-75/I-85 LANDSCAPING/ ENHANCEMENT PROJECT MILEAGE : 2.00 - EXIST, MANAGER: NEIL DAVIS NOT APPLICABLE

P.D.L LANES: 4

ATLANTA TIP f AT-R 41 CONG DIST. 5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 27

FISCAL YEAR

COST ESTS

PE NONE

$

ROW NONE $

CONST 1995 $

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 2000 1600 400

FULTON 721850
STATUS:

SR 400@ HAMMOND, ABERNATHY, INTERCHANGE/ RECST, OR PROJECT MILEAGE : ,00 MANAGER: NEIL DAVIS (CM) CONTRACT REQ CO PE, ROW,

ATLANTA TIP f FN-R 100

PE 1993 UNDERWAY

CONG DIST. 5

ROW 1995 $ 4000

14

CONST 1997 $ 30000

FUND SOURCE: NAT'L HIGHWAY

FED SHARE $ 24000

FEDERAL HIGHWAY ADMIN FUNDS

GA, SHARE $ 1100

72Y850 IS AN ASSOCIATED PROJECT.

0TH SHARE $ 4900

FULTON 721920
STATUS:

SR 140/HOLCOMB TURN LANES/ SAFETY PROJECT MILEAGE : .17 MANAGER: D. GODWIN CONTACT TRAFFIC OPERATIONS

ATLANTA TIP f FN 87
CONG DIST. 6
5
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

PE 1994 UNDERWAY

ROW LOCL

CONST 1996 $

56

FED SHARE $

56

GA. SHARE $

0TH SHARE $

FULTON 721930
STATUS:

SR 120 AT STATE BRIDGE ROAD TURN LANES/ SAFETY PROJECT MILEAGE : .00 - EXIST, MANAGER: NEIL DAVIS CONTACT TRAFFIC OPERATIONS

FULTON 72Y510
STATUS:

SR 120/ALPHARETTA FM SR 9 TO SR 400; FOR REST

$;

RECONSTRUCTION & WIDENING FROM 2 LANES TO 6 LANES.

PROJECT MILEAGE : 1.33

MANAGER:

SEE 721510

FULTON 72Y850
STATUS:

SR 400@ HAMMOND, ABERNATHY, CD SYS;PARTIAL R/W FOR 721850 UNKNOWN/ UNKNOWN PROJECT MILEAGE ,00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER:

FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

'~ ATLAN::);J~)t FN 16

:':'/'/:'CONG DIST}/$

tsui8fu; F~:~/

>>. SURFACE TPANSP()RT

PE NONE $ ROW 1995 $ CONST 1996 $
FED SHARE $ GA. SHARE $ 0TH SHARE $
PE NONE $ ROW 1995 $ CONST NONE $

~~~fffl
..:::::::::-

r

:

f

!

I

:

w

!

~

s

~

~

f

~~~
. ......

~
..

~~ .

~

J

E

C

T

.

.

..:

\

A TIP t .FN ....

PE NONE

$

DIST. 5{)( .

ROW 1996 $

::::\tbNST NONE .C.... ':'.i.::C0
Ftfuo souRcitt5f, L HIGHWAY , rn

$

~~~j~f~~.ffl~f~s~~!~E~u;~i~8fl

0 10 156 156
0 3000
0
0
4850
0

FULTON 730753
STATUS:

SOUTH FULTON PKWY FM COCHRAN MILL RD TO SR 154 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED. PROJECT MILEAGE : 2.20 MANAGER: G. ROSS CO SGN 12/89 ROW/UTIL/DESIGN; REQ CITY DO CITY UTIL 5-17-92

ATLANT~\fip f FS 36
:::: ::::~:: suRFi2l!i!RANsPoRT.
FEDERAL HIGHWAY AriMIN FUNDS

PE LOCL ROW LOCL CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

4600 3680
920

COUNTY P;I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM . PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 730885
STATUS:

STATE BRIDGE RD@ JOHN'S CRK REHAB. OF.THE EXISTING BRIDGE($). FROM PROJECT MILEAGE : . 00 MANAGER: NEIL DAVIS FULTON COUNTY SIGNED 2/21/90 FOR

LANES.

ATLANTA TIP# FN 71 CONG DIST. 6
FUND.SOURCE: .BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

;u-Feb-1YY4 Page 28

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW LOCL

CONST 1996

$

288

FED SHARE$ 230

GA. SHARE$

5~

0TH SHARE$

FULTON 730960
STATUS:

CR 1374/BUTNER RD@ DEEP CREEK REPLACEMENT OF THE EXISTING PROJECT MILEAGE : .19 MANAGER: D, GODWIN
REQ COUNTY DO ROW,

ATLANTA TIP# FS 62 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1996

$

332

FED SHARE$ 266

GA. SHARE$

66

0TH SHARE$

FULTON 731420
STATUS:

SR 120/Jl.i."BOTTS TURN LANES/ SAFETY PROJECT MILEAGE : ,00 MANAGER: D, GODWIN CONTACT-TRAFFIC OPERATIONS

ATLANTA TIP# FN 3 CONG DIST.. 6. 3 FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

. PE 1994

UNDERWAY

ROW 1995

$

10

CONST 1996

$

406

FED SHARE $

365

GA. SHARE $.

41

. 0TH SHARE $

FULTON 731430
STATUS:

STATE BRIDGE ROAD FM ALPHA LANDSCAPING/ ENHANCEMENT PROJECT:MILEAGE : 2.34 - EXIST. LANES:
MANAGER: NEIL DAVIS NOT APPLICABLE

FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW NONE $

0

CONST .1996 . $

288

FED SHARE$

230

GA. SHARE$

50

. 0TH SHARE$

FULTON 742482
STATUS:

SR 166/LAKEWOOD FWY EB EXIT RAMP @ SYLVAN RD INTERSECTION IMPROVEMENT / SAFETY PROJECT MILEAGE : .00 --EXIST. LANES: 4 /PROPOSED LANESi<f){{:C

MANAGER= o: GODWIN T&S SENT TO EAST POiNT AND ATLANTA - NO SGN COPY

Bf8/

. ATLANTA Tfii.t AT-Rll6 : (CONG DIST}g
n:::: : .. ..
F~:M:;w@J = HWY.. SAFET.t:
FEDiAAL,iiIGHWAY ADMIN?:ttiNDS

PE NONE

$

0

ROW NONE $

0

CONST 1996

$

143

FED SHARE $ 129

.. _.GA. SHARE $'

14

OTH,SHARE $

FULTON 74280X
STATUS:

LOWER RIVER RD FM SR 92/FAIRBURN RD TO COBB CO LINE/DOUGLAS
UNKNOWN/ 1.JNKNOWN. PROJECT MILEAGE :. ; 00 .- EXIST: LANES: 0 /PROPOSED LANES: 0 MANAGER: . UNKNOWN

.od Ai.ANTA TIP*
.CONG DIST; 7 _..:.::::-'
;MJ;;, souRcii\F g&fu-AcE TRANSPcik'J ! FEDERAL .ltfoH.WAY ADM IN FUNDS fr ) . 742800 :ts\filf ASSOCIATED PRO',#cT>

PE 1996 ROW LOCL {CONST

$

0

AFTER 97

FULTON 750780
STATUS:

BANKHEAD HWY/SR 8 FM HARWELL RD TO SR 280/HIGHTOWER RD

RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES,

PROJECT MILEAGE : 1,25

MANAGER: D. SMITH . (M)

SEND LGPA.IN 1997

.

ATLANT~\~iP # AT 1 CONG DIST. 5
FFUEDNDERASOLUHRICGEH:WASYURioFMAdI/N:iAFAUNNSDPSORT. ,; ,,_

PE 1995 ROW -1997 CONST

$

100

$ 300

AFTER 97'

~

~

~

f,,

-

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 751140
STATUS:

WASHINGTON RD/E.POINT FM DELOWE DR TO LEGION WAY RECONSTRUCTION & WIDENING FROM 2 LANES T0::5 LANES. PROJECT MILEAGE : ,90 MANAGER: BILL MOSKAL (M) SIGNED BY EAST POINT 9-25-85 FOR ROW & j}f~#f4tES

ATLANTA TIP# FS 25 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

'. . . . 1~- . -~

22-Feb-1994 Page 29

FISCAL YEAR

COST EST$

PE 1996 ROW LOCL CONST

$

100

AFTER 97

FULTON 751146
STATUS:

WASHINGTON RD/E POINT FM I-285 RECONSTRUCTION & WIDENING FROM PROJECT MILEAGE : .80
MANAGER: BILL MOSKAL (CM .-::::c-::::-.-:-:-:-:-:-:-::::::0::::- SIGNED BY EAST POINT 9-2~.,#3~/R R/W & UTILITIES

ATLANTA TIP# FS 17 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

100

AFTER 97

FULTON 751410
STATUS:

ATLANTA TIP# FN 48 CONG DIST. 6
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW 1997 CONST

$

101

$ 7454

AFTER 97

FULTON 751560
STATUS:

HOWELL MILL RD/ATLANTA FM RECONSTRUCTION & WIDENING PROJECT MILEAGE : .10 MANAGER: D. CHURCH (M) SEND LGPA WHEN PROJECT IS ADDED TO CWP

SOURCE: SURFACE TRANSPORT. HIGHWAY ADMIN FUNDS
::::=:::{tt:: ..

PE 1996 ROW LOCL CONST

$

9

AFTER 97

FULTON 751900
STATUS:

SR 14/US 29/PETERS ST @ L&N AND C OF G RR APPR. MI N/I-20.::: REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES.
:~t~~~~/!~~~iH: PROJECT MILEAGE : ,00 UTIL & FULTON DO CO-OWNED UTIL 2-4J~~i :(

ATLANTA T~t;.# AT 71

PE 1992 UNDERWAY

:C:QNG DI~T/ 5

ROW NONE

$

0

1Jl2fu: 1
FU;i

BRIDGE PROGRAM>:

CONST 1996

$ 3729

FED SHARE $ 2983

FEDERAL HIGHWAY AtiMIN FUND$

:

GA. SHARE $

746

750455/ts AN ASSOCIATED:PROJECT._ ?

0TH SHARE $

FULTON 752015
STATUS:

COURTLAND ST OVER CSX RR REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .10 MANAGER: BEN BUCHAN REQ CITY/ATLANTA DO ROW, UTIL & DETOURS 10/92 (SEE #752010)

FULTON 752020
STATUS:

PEACHTREE ST@ GEORGIA RR & MARTA AT UNDERGROUND ATLANTA REPLACEMENT OF THE EXISTING BRIDGES($). NO ADDED LANES. PROJECT MILEAGE : .00 MANAGER: BEN BUCHAN REQ CO DO PUB UTIL, CITY DO ROW & UTIL 5-3-93

j :f~~~~si:P5!,:ft]tf)

PE NONE

$

0

ROW LOCL

-;at6 souRckiikiDGE PROGRAM'\\:\\ t.:c:1.c<

1996

$

FED SHARE $

685 548

FEDERAL il!GHW.A.Y ADMIN

GA. SHARE $

137

0TH SHARE $

1

AT~:~ ~[ # CONG DIST. -:::,5
FUND SOURCE: FEDERAL HIGHWAY

PE 1992

UNDERWAY

ROW LOCL

CONST 1997

$ 1650

FED SHARE $ 1320

GA. SHARE $

330

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 752030
STATUS:

INTERU:'\.'.CIONAL BLVD @ CSX & NORFOLK-SOUTHERN RR @ THE OMNI

REPLACEMENT OF THE EXISTING BRIDGES (S) t,tq ADDED LANES.

PROJECT MILEAGE : . 00

..

uffD =A;~~~o:E~OB~g~TIL, CITY DO ROW &

1\i3-93

ATLANTA TIP t AT 68
CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAYADMIN FUNDS

22-Feb-1994 Page 30

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW LOCL

CONST 1997

$ 1580

FED SHARE $ 1264

GA. SHARE $

316

0TH SHARE $

FULTON 752040
STATUS:
FULTON 752070
STATUS:

ROXBORO RD FM E PACES FERRY

BRIDGES/ REPLACEMENT

PROJECT MILEAGE : .20

=A~~~~ 9~E~QD~~i~- i;Mio~J

Mifti? &

PE;REQ

co

PUB

1
uTftl/ 2;91

-~:~LO SR 139 @ FAIRBURN RD;'ffi:ifoRST DR;FM FLORIDA AV TO

INTERSECTION IMPROVEMEN1\{'/\,.RECST. OR REHAB.

'

PROJECT MILEAGE : 55 - Ejt:i:ST. LANES: 4 /PROPOSl!:b)~l!:S: 5

MANAGER: D. GODWIN



....

REQ. ATLANTA DO UTIL AND COUNT'.(

ATLANTA TIP f AT 9 CONG DIST. 4 & 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1996 ROW LOCL CONST

$

50

AFTER 97

ATLANTA TIP f AT 79

PE LOCL

CONG DIST . 5

ROW LOCL

CONST 1995

$

563

FUND SOURCE: DEMONSTRATION PROGRAM

FED SHARE$

450

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

113

0TH SHARE$

FULTON 752082
STATUS:

CENTRAL AVENUE OVER CSX RAILROAD
REHAB. OF THE EXISTING BRIDGE (S). FROM 2 LANES TO .,t
PROJECT MILEAGE: .00
MANAGER: BEN BUCHAN REQ CITY OF ATLANTA DO ROW, UTILITIES &

ATLANTA TIP t AT 85
~ONG DIST. 5
'J;UND SOURCE: BRIDGE PROGRAM . FEDERAL HIGHWAY ADMIN FUNDS

PE 1993 UNDERWAY

ROW LOCL

CONST 1997

$

755

FED SHARE $

604

GA. SHARE $

151

0TH SHARE $

FULTON 752084
STATUS:
FULTON 752086
STATUS:
FULTON 752130
STATUS:

TECHWOOD DR OVER CSX RAILROAD & NORFOLK-SOUTHE;~\RAILWAY REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANE9i PROJECT MILEAGE : .00
=A~~~~ ~:NA~~ DO ROW, UTILITIES & DETOURS 10-20-9~:: :/
SPRING STREET OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT-MILEAGE : .00 MANAGER: BEN BUCHAN REQ CITY OF ATLANTA DO ROW, UTILITIES & DETOURS 10-20-92
AUBURN AVENUE PEDESTRIAN SYSTEM FM PARK PL TO BOULEVARD BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : 1.20 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D.CRANFORD REQ FULTON DO PUB UTIL & ATLANTA DO ROW & UTIL 9-22-92 (HOLD

\:~;~~~si~!:~f AT 87
~:~~~~~~w!~I~~I:f~g~e

/!: i~~~si~P t rilt!li :}) 5

iJ:b souRcif(:lif~GE PROGRAM

FEDERAL lifGk~AY ADMIN

iiii'

t, ATLANT:\f f
CONG DIST. :5
FUND SOURCE: FEDERAL HIGHWAY

PE 1993 UNDERWAY

ROW LOCL

CONST 1996

$

843

FED SHARE $

674

GA. SHARE $

169

0TH SHARE $

PE 1993 UNDERWAY

ROW LOCL

1996

$

843

FED SHARE $

674

GA. SHARE $

169

0TH SHARE $

PE LOCL

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE. $

0TH SHARE $

0 1000
800
200

-

~

~

,.

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 31

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P. I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

--------------------------- ------------------------------------------------------------------------------------------------------

FULTON PEACHTREE ST PEDESTRIAN SYSTEM FM

PINE ST

ATLANTA TIP# AT-R 143

PE LOCL

752140 BICYCLE/PED. FACILITY/ ENHANCEMENT

CONG DIST. 5

ROW NONE

$

0

PROJECT MILEAGE : 4.70 - EXIST. LANES:

0

CONST 1995

$ 5925

MANAGER: D. CRANFORD

FUND SOURCE: TRANS. ENHANCE.

FED SHARE $ 4740

STATUS: TO BE DONE BY CONTRACT

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE $

0TH SHARE $ 1185

FULTON 752150
STATUS:

WINDSOR PARKWAY AT NANCY REHAB. OF THE EXISTING PROJECT MILEAGE : .00 MANAGER: D. GODWIN REQ COUNTY DO

FULTON 752160 STATUS:

GLENWOOD AVE FROM ~~~~,ri~',J,wT
CONSTRUCTION OF NEW u, PROJECT MILEAGE : .30 MANAGER: G. ROSS REQ FULTON DO PUB UTIL,

ATLANTA TIP# FN 21 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP# AT 57 CONG DIST. 5
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS

PE 1993

UNDERWAY

ROW LOCL

CONST 1995

$

100

FED SHARE $

80

GA. SHARE $

20

0TH SHARE $

PE 1993

UNDERWAY

ROW LOCL

CONST 1995

$

288

FED SHARE $

230

GA. SHARE $

58

0TH SHARE $

FULTON 752230
STATUS:

SR 54/JONESBORO RD. OVER THE SOUTH RIVER IN REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED PROJECT MILEAGE : .00 MANAGER: D. GODWIN (M) REQ CITY OF ATLANTA DO UTILITIES 12-1

FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 752320
STATUS:

POWERS FERRY RD/CR 300 OVER LONG ISLAND CREEK

... '" , ATLANT:j:t,. FN 85

REHAB. OF THE EXISTING BRIDGE (S). FROM 2 LANES TO 4 LANEsf/' ,,::crr::coNG DIST:c/)5

PROJECT MILEAGE : .00 MANAGER: D. GODWIN (M)

FUND JB&i.{C:f: BRIDGE PRoc;fG;h}

SEND LGPA IN 1995

FEDJtii:iu:Ylh:GHWAY ADMIN FUNDS

FULTON 752520
STATUS:

CS 1985/MITCHELL STREET @ SOUTHERN RAILROAD .2. MI W OF SR REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.

3E

PROJECT MILEAGE : . 2.9

MANAGER: BEN BUCHAN (M)

SEND LGPA IN 1994 TO ATLANTA FOR ROW & UTILITIES

i:il!li!!jg~: DIST. 5
;bk~ souRciiftf~GE
FEDERAL .Jtrfaiw.il.Y

PE 1995

$

24

ROW 1995 $

1

CONST 1996

$

975

FED SHARE $

780

GA. SHARE $

195

0TH SHARE $

PE 1994

UNDERWAY

ROW LOCL

CONST 1997

$

446

FED SHARE $

357

GA. SHARE $

89

0TH SHARE $

PE 1995

$

ROW LOCL

1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

50
2380 1904
476

FULTON 752540
STATUS:

CS 2661/HOLLYWOOD ROAD@ PROCTOR CREEK 1.8 MIN OF JCT US 78 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES. PROJECT MILEAGE : .20 MANAGER: UNKNOWN SEND LGPA 10/94

FUND SOURCE: FEDERAL HIGHWAY

PE 1995 $

8

ROW LOCL

CONST 1997

$

445

FED SHARE $

356

GA. SHARE $

89

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 752545
STATUS:

CR 1349/FAIRBURN ROAD@ CSX RAILROAD REPLACEMENT OF THE EXISTING BRIDGES($). PROJECT MILEAGE : .22 MANAGER: UNKNOWN SEND LGPA 10/94

CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 752550
STATUS:

CS 1259/LAKEWOOD AVE. @ REPLACEMENT OF THE EXISTING PROJECT MILEAGE : 22 . -
MANAGER: D. GODWIN SEND LGPA 10/94

SR CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 752560
STATUS:

CS 3586/SPRING REPLACEMENT OF THE PROJECT MILEAGE : . 48 MANAGER: D. GODWIN SEND LGP~ 10/94

CONG DIST . 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 770270
STATUS:

CS 6351/DESERT DR@ CAMP CREEK REPLACEMENT OF THE EXISTING BRIDGES(S). PROJECT MILEAGE : .00 MANAGER: D. GODWIN E. POINT SGN 11-3-92 ROW/UTIL/DETOURS;

~i:#f / NO ADDED

: :

,.Ac..'..oTLANNGTDAISTTI.P5i FS 66 t,_:,.,.,.,.,,.,.,.,.,.,''.
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

FULTON 770274
STATUS:

CR 593/0LD BILL COOK RD NE OF UNION CITY@

REPLACEMENT OF 'rHE EXISTING BRIDGES (S). NO

PROJECT MILEAGE : 00



MANAGER: D. GODWIN.

REQ FULTON DO ROW, UTILITI~S & DETOURS 8-24-92

s ATLANTA Tit :i FS 63
C..ONG ors> ..,,.:.;-.:-,:--:-:.-:
F~~ M!Mt:Ji: BRIDGE PROGr&u }
FEDERAi jfi:GHWAY ADM IN FUNDS

FULTON 770276
STATUS:

FORSYTH ST/C.S. 2038 OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE: .00 MANAGER: BEN BUCHAN REV REQ ATLANTA DO UTILITIES & PAY 20% OF ROW COST 1-24-94

Kir'~TA TIP i Ainlht
<ii2PNG DIST. 5 /
FUND SOURcf{' aidoGE PROGRAM
FEDERAL., ftfoiJ1iliY ADMIN

FULTON 770277
STATUS:

PRYOR ST/CS 2044 OVER CSX RAILROAD REHAB. OF THE EXISTING BRIDGE(S). FROM 2 LANES TO 4 LANES. PROJECT MILEAGE : 00 MANAGER: BEN BUCHAN REQ CITY OF ATLANTA DO ROW, UTILITIES & DETOURS 10-20-92

ATLANTA TiP i CONG DIST. ::5
FUND SOURCE: BRIO,GE. FEDERAL HIGHWAY

22-Feb-1994 Page 32

FISCAL YEAR

COST ESTS

PE 1995

$

20

ROW LOCL

CONST 1997

$

800

FED SHARE $

640

GA. SHARE $

160

0TH SHARE $

PE 1995 ROW LOCL CONST

$

23

AFTER 97

PE 1995 ROW LOCL CONST

$

211

AFTER 97

PE 1994

$

5

ROW LOCL

CONST 1995

$

214

FED SHARE $

171

GA. SHARE $

43

0TH SHARE $

PE 1995

$

5

ROW LOCL

CONST 1996

$

112

FED SHARE $

90

GA. SHARE $

22

0TH SHARE $

PE 1993

UNDERWAY

ROW 1994

$ 3000

1995

$ 1241

FED SHARE $

993

GA. SHARE $

248'

0TH SHARE $

PE 1993 UNDERWAY

ROW LOCL

CONST 1997

$

562

FED SHARE $

450

GA. SHARE $

112

0TH SHARE $

,.

=

COUNTY P .I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 770278
STATUS:

CR 485/ENON ROAD@ ENON CREEK N OF FAIRBURN REPLACEMENT OF THE EXISTING BRIDGES (S). .N.9. ADDED LANES. PROJECT MILEAGE : .20 MANAGER: D. GODWIN REQ FULTON DO ROW, UTILITIES &

ATLANTA TIP i FS 65 CONG DIST. 5
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 33

FISCAL YEAR

COST ESTS

PE 1994

UNDERWAY

ROW LOCL

CONST 1995

$

179

FED SHARE $

143

GA. SHARE $

36

0TH SHARE $

FULTON 770310
STATUS:

ATLANTA MULTI-MODAL PASSENGER TE&liWidY'. TRANSIT PROJECTS / NEW CONSTRUC.'J.'.foif{'
PROJECT MILEAGE : . 00 - EXIST{ :LANES: 0
~~~:\~N ~~~!R!E 9-8-"J:~rfUNDS:FHWA 31%,FTA 49iliL 20%

ATLANTA TIP i R 120 CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW 1994

$ 20000

CONST 1995

FED SHARE $ 84000

GA. SHARE $ 21000

0TH SHARE $

FULTON 770385
STATUS:

NORTHSIDE/GEORGIA Do~:$BKvEILLANCE PROJECT MISCELLANEOUS IMPROVEMEN1it. / SAFETY

. ,,..,,., ..... : ,.,.,.

PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPosibJmfs: 0

MANAGER: BURT RIDDLE

NOT APPLICABLE

CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 760
608 152

FULTON 770395
STATUS:

ATLANTA TRANSPORTATION MANAGEMENT CENTER BUILDING FUJ!i.'fifsiJf\;fif'

MISCELLANEOUS IMPROVEMENTS/ SAFETY

i'/{\CONG DIST. 5

PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSEP/:ill.Wfs: 0 MANAGER: BURT RIDDLE

.,.,,,;:;::FUND SOURCE: DEMONSTRATION PROGRAM

NOT APPLICABLE

FEDERAL HIGHWAYADMIN FUNDS
...;-:,:,:,:,:::::::-:

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0 1000
800 200

FULTON 770396
STATUS:

ATMS MODIFICATIONS TO FIVE TRANSPORTATION MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED MANAGER: BURT RIDDLE REQ DEKALB/FULTON/COBB/GWINNETT ATMS l/94;CLAYTON

& 3 FUND'l8Jk8~; DEMONSTRAT.t6JfJ!bi't&.M
FEDtm HIGHWAY JiliMrn'hiNDs

PE NONE

$

ROW NONE

$

CONST 1995

$

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0
5000 4000 1000

FULTON 770397
STATUS:

ATMS NON-FREEWAY FIELD COMMUNICATIONS FIBER OPTIC CABLE MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE OTO WILL NOTIFY

,:;:::g[:G DIST. 6 &
;gJ;:; souRcl{Jg:JJ;NSTRATION
FEDERAL rtfcfawb

PE NONE

$

ROW NONE

$

.CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0
9500 7600 1900

FULTON 770398
STATUS:

ATMS NON-FREEWAY ADVANCED TRAVELER INFORMATION SYSTEM
MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE OTO WILL NOTIFY

CONG DIST. \5 & 11
FUND SOURCE: DEMo~itfutfroN PROGRAM
FEDERAL HIGHWAY Ai::iMrN FUNDs

PE NONE

$

ROW NONE

$

CONST 1995 $

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0
2000 1600
400

COUNTY P.I.NO..

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-.L!l!/4 Page 34

FISCAL YEAR

COST ESTS

FULTON 770401
STATUS:

COMPUTER HWDWARE/SOFTWARE-ATL REGIONAL '.r,1U\NS MANAGEMENT SYS
:~~~~ ,I~:!~iy: 00 - EXIST. LANES: 0 /fr.BQPOSEO LANES: 0 1
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE

ATLANTA TIP i R 98

PE NONE $

0

CONG DIST. 5

ROW NONE $

0

CONST 1995

$

155

FUNQ SOURCE: DEMONSTRATION PROGRAM

FED SHARE.$

124

FEDERAL HIGHWAY AOMIN FUNDS

GA. SHARE$

31

0TH SHARE$

FULTON 770403
STATUS:

SURVEILLANCE SYSTEM I-75 FM I-85}rO'N!SIOE & I-B~Jfo BUFORD

MISCELLANEOUS IMPROVEMENTS / s,tlE't:ff@:

-:::::,

PROJECT MILEAGE : 11. 00 - EXIS'Ji('LANES: 0 /PROPOSEJ/~ES: 0

MANAGER: BURT RIDDLE

LGPA NOT APPLICABLE

CONG DIST. 5
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE NONE

$

ROW NONE $

CONST 1995

$

FED SHARE $

GA. SHARE $

. 0TH SHARE $

0 0 2000 1600 400

FULTON 770404
STATUS:

ATL TRANS MGMT sys -Mhl:tRh'iME:NT CENTER & CONTROL cotii'.~wARE
:~~~c/~~i~;:. ~ ~~E=YlksT. LANES: 0 /PROPosia::1mi~: 0
MANAGER: BURT RIDDLE NOT APPLICABLE

CONG DIST. 5
FUND SOURCE: .OEMONSTRATIONPROGRAM FEDERAL HIGHWAY AOMIN FUNDS

PE NONE

$

ROW NONE

$

CONST 1995 $

FED SHARE $

GA. SHARE $.

0TH SHARE $.

0 0 4000 3200 BOO

FULTON 770405
STATUS:
FULTON 770406
STATUS:

ATL TRANS MGMT sys -UPGRADE CITY ATL TRAFFIC oPERATrdJkj~~~~:

PE NONE

$

MISCELLANEOUS IMPROVEMENTS/ SAFETY
PROJECT MILEAGE: .00 - EXIST. LANES: 0 /PROPOSEO: LANES: 0

ROW NONE

$

CONST 1995

$

MANAGER: BURT RIDDLE

PROGRAM

FED SHARE,$

FORCE ACCOUNT AGREEMENT WITH ATLANTA

ADMIN FUNDS

.GA. SHARE$

ADVANCED TRAVELER INFO SYS-VARIA MSG SGNS, HWY ADVISE MISCELLANEOUS IMPROVEMENTS/ SAFETY

0::: DIST,, , 10

0TH SHARE$

PE NONE

$

ROW NONE

$

PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES;{ ::o::,;::::::: ,..
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE

ii:iaRAM FUND :)i'tjtAfc'E: OEMONSTRATfot

CONST 1995 $ FED SHARE.$

FEot~t:ihGHWAY AriMrn,tilitos

GA. SHARE$

0TH SHARE$

0 0 250 200 50
0 0 5500 4400 1100

FULTON 770407
STATUS:

RAMP METERING AT VARIOUS RAMPS ONTO I-75, I-85 & I-20 RAMP / SAFETY . PROJECT MILEAGE : .. 00 - EXIST. LANES: O /PROPOSED LANES: 0
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE

FULTON 770408
STATUS:

INSTALL COMMUNICATIONS LINKS BETWEEN TMC ANO TCC'S MISCELLANEOUS IMPROVEMENTS./ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE

:41 / . \ 6NG DIST. 5_./t;

:g:: . R~:

~

0 0

;kJJ~'. FUND souRci(i:;fi:.ioNSTRATION

~ 9

750

toNs~E~ !~ARE . 600

FEDERAL.HiGHWAY AOMIN FUNDS .. . .

GA. SHARE $

150

0TH SHARE$

~ CONG 0:::\,,,5 & 1
FUND. SOURCE: DEMotit';~f;ON PROGRAM
FEDERAL HIGHWAY J)MIN FUNDS

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $.
GA. SHARE$ 0TH SHARE$

0
0
3000 2400
600

=

c:;::;;::::;;,

c:

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 35

FISCAL YEAR

COST ESTS

FULTON 770410
STATUS:

ATMS ADVANCED VEHICLE IDENTIFICATION MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE: .00 - EXIST. LANES: MANAGER: BURT RIDDLE LGPA NOT APPLICABLE

LANES: 0

ATLANTA TIP i R 174
CONG DIST. 6 & 4
FUND SOURCE: DEMONSTRATION PROGRAM FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $

ROW NONE

$

CONST 1995 $

FED SHARE$

GA. SHARE$

0TH SHARE$

0
0
1800 1440
360

FULTON 770450
STATUS:

HISTORIC DEPOT RENOVATION IN MISCELLANEOUS IMPROVEMENTS/ PROJECT MILEAGE : .00 MANAGER: UNKNOWN TO BE DONE BY CONTRACT

ATLANTA TIP i FS 64
CONG DIST. 5
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996 $ 188

FED SHARE$

150

GA. SHARE$

0TH SHARE$

38

FULTON 770490
STATUS:

TRAIL SYSTEM IN BICYCLE/PED. FACILITY PROJECT MILEAGE : .00 MANAGER: STEVE YOST TO BE DONE BY CONTRACT

ATLANTA TIP i FN 80
CONG DIST. 6
0
FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1996

$

711

FED SHARE$

569

GA. SHARE$
0TH SHARE s 142

FULTON 770510
STATUS:

BICYCLE/PEDESTRIAN/LANDSCAPING IN ALPHARETTA BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .00 - EXIST. LANES: 0 MANAGER: UNKNOWN TO BE DONE BY CONTRACT

SOURCE: TRANS. ENHANCE. HIGHWAY ADMIN FUNDS

PE LOCL ROW LOCL
CONST 1996 $ FED SHARE $ GA. SHARE $ 0TH SHARE $

1250
rooo
250

FULTON 770520
STATUS:

FROM FREEDOM PARKWAY TO BICYCLE/PED. FACILITY/ PROJECT MILEAGE : .00 -
MANAGER: STEVE YOST TO BE DONE BY CONTRACT

PE LOCL

ROW LOCL

CONST 1995 $ 300

FED SHARE $ 240

GA. SHARE $

'0TH SHARE $

60

FULTON 770540
STATUS:

CAPITOL AVE PEDESTRIAN CORRIDOR FM STADIUM TO GA STATE MARTA BICYCLE/PED. FACILITY/ ENHANCEMENT
PROJECT MILEAGE : .90 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: D. CRANFORD TO BE DONE BY CONTRACT

FULTON 770545
STATUS:

PEDESTRIAN BRIDGE/CORRIDOR FM DOME/WCC TO FIVE POINTS BRIDGES/ ENHANCEMENT. PROJECT MILEAGE: .00 MANAGER: STEVE YOST TO BE DONE BY CONTRACT

FtiNo sou~9tJIiiliis. ENHANCE.

FEDERAL.:Hl'.i:;liWAY ADMIN

u,;_,i/:,///:::'i::"

PE LOCL ROW LOCL
1995 $ FED SHARE $ GA. SHARE $ 0TH SHARE $

5000 4000
1000

ATLAN:~:::~[ i CONG DIST. -::5
FUND SOURCE: FEDERAL HIGHWAY

PE LOCL ROW LOCL CONST 1995 $
FED SHARE $ GA. SHARE $ 0TH SHARE $

2200 1760
440

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 770550
STATUS:

INTERNATIONAL BLVD PEDESTRIAN CORRIDOR BICYCLE/PED. FACILITY/ ENHANCEMENT PROJECT MILEAGE : .85 - EXIST. LANES: 0 MANAGER: D. CRANDORD TO BE DONE BY CONTRACT

PIEDMONT AV

ATLANTA TIP t R 145 CONG DIST. 5
FUND SOURCE: TRANS. ENHANCE; FEDERAL HIGHWAY ADMIN FUNDS

FULTON 770555
STATUS:

ATLANTA UNIVERSITY PROMENADE PRELIMINARY ENGINEERING/ PROJECT MILEAGE : .00 MANAGER: D. CRANFORD TO BE DONE BY CONTRACT

ATLANTA TIP t R 148 CONG DIST. 5 0 FUND SOURCE: TRANS. ENHANCE. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 36

FISCAL YEAR

COST ESTS

PE LOCL

ROW LOCL

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

4000 3200
800

PE 1995

$

500

ROW NONE

$

0

CONST NONE

$

0

FULTON ADDITIONAL INCIDENT__,:,~,i,J';J''~-~

770595 .. MISCELLANEOUS

"

PROJECT MILEAGE : .00 -

0

MANAGER: BURT RIDDLE

STATUS: NOT APPLICABLE

FULTON 770597
STATUS:

BICYCLE FACILITIES AT COMMUTER AND HIGH DENSITY
:!;~~~/:~~EA~:C;L~~~ ~~~~~~-LANES: 0 /PROPOSE~:~f~i 0 MANAGER: LUKE COUSINS NOT APPLICABLE

FULTON 770605
STATUS:

TRAFFIC SIGNAL SYSTEM OPTIMIZATION IN FULTON c;ifNTY

~i SIGNALS/ SAFETY



PROJECT MILEAGE : . 00 - EXIST. LANES: 0 /PROPOSED LANES

MANAGER: BURT RIDDLE

""

REQ FULTON DO ROW, UTIL, PE & 20% CONSTRUCTION 7-15-93\:}i

FULTON 770610
STATUS:

TRAFFIC DETECTION ENHANCEMENT MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: BURT RIDDLE NOT APPLICABLE

FULTON 770631
STATUS:

REGIONAL RIDESHARE PROGRAM RIDE SHARING/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0 MANAGER: LUKE CCUSINS
NOT APPLICABLE

ATLANTA TIP tR 173 CONG DIST. 5
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW NONE

$

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 1000
BOO 200

\ATLANTA TIP t R 177 :QONG DIST. 5
FUND SOURCE: CONG MIT. /AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS
:?\:;\:\:- .

PE LOCL

ROW NONE

$

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

-0 500 -400
100

>t;~~~~sl~~:~ &F:86/Fs48
ati F~;;:,1aijiEi: CONG:_MIT ./Kit
FEDE:MliiliIGHWAY ADMINFUNDS ,::::

PE 1994

$

50

ROW NONE

$

0

CONST 1995

$

460

FED _SHAR.E $

368

GA. SHARE $

0TH SHARE $

92

.,
FUND SOUR<;:${'66i4G MIT. /AIR l,lU.tU.,,,,_,,.,,,:,,/
FEDE:RAL 11:tq,fii'.?AY ADMIN

PE NONE

$

ROW NONE

$

1995

$

FED SHARE $

GA; SHARE $

0TH SHARE $

!:[p ATLANT:

t R 159

CONG DIST. C:5 & 4

FUND SOURCE: FEDERAL HIGHWAY

PE NONE

$

ROW ~ONE

$

CONST 1996

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 2000 1600 40_0
0
0
3000 2400
600

r.

~

.

r.

GEORGIA DEPARTMENT OF TRANSPORTATION

22-Feb-1994

DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM

Page 37

PROJECT LISTING BY COUNTY FY 1995/FY 1997

COUNTY

DESCRIPTION

FISCAL

COST

P.I.NO.

PROJECT DATA

COMMENTS

YEAR

ESTS

---------------
FULTON MARTA

D.E-M-A-N-D--R-E-S-P-O-N-S-I-V-E--M--IN-I---B-U-S-E-S---(2-)----------Y-E-A-R---------------A-T-L-A-N-T-A--T-I-P--t--M---R--1-6-1-------------------P-E--N-O-N-E------$------

0

770633 MISCELLANEOUS IMPROVEMENTS/ OTHER

CONG DIST. 5 & 4

ROW NONE $

0

PROJECT MILEAGE : . 00 - EXIST. LANES: 0

0

CONST 1996

$

362

MANAGER: LUKE COUSINS

FUND SOURCE: CONG MIT./AIR QUAL

FED SHARE$

290

STATUS: NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

GA. SHARE$

0TH SHARE$

72

FULTON 770636
STATUS:

MARTA BUS PRIORITY CONTROL MISCELLANEOUS IMPROVEMENTS PROJECT MILEAGE : .00 MANAGER: LUKE COUSINS NOT APPLICABLE

ATLANTA TIP t M-R 164
CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

PE 1995 $

30

ROW NONE $

0

CONST 1996

$

500

FED SHARE$

400

GA. SHARE$

0TH SHARE$

100

FULTON 770637
STATUS:

SIDEWALKS AT RAIL SIDEWALKS/ OTHER PROJECT MILEAGE : .00 MANAGER: LUKE COUSINS SEND LGPA IN 1995

ATLANTA TIP i R 165
CONG DIST. 5 & 4
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

FULTON 770638

=r~~~T;:::o~~~~~T:~s FOR RIGR CONGEsil~ tad'" wi~"!"i~s~:Sf&R,'"

PROJECT MILEAGE : .. 00 - EXIST. LANES: 0 /PROPOSEp: :Llill1t'S: 0

MANAGER: LUKE COUSINS

FUND SOURCE: CONG MIT./AIR QUAL

STATUS: NOT APPLICABLE

FEDERAL HIGHWAY ADMIN FUNDS

PE NONE $ ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0 0
6000 4800
1200

PE LOCL ROW NONE $ CONST 1996 $
FED SHARE$ GA. SHARE $ 0TH SHARE$

0
3000 2400
600

FULTON 770660
STATUS:

MARTA ADA PARATRANSIT/RAIL STATION MODIFICATIONl;c PHASE 2 . TRANSIT PROJECTS/ CAPITAL PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED
MANAGER: NOT APPLICABLE

FUNi:Mfoidf: SURFACE TRlffiJidJ!fi
FER,E~/HIGHWAY ADMIN .tUNPS
7 TJ6"60XIS AN ASSOCiATEP _PROJECT. :}

PE NONE $ ROW NONE. $ CONST 1996 $
FED SHARE$ GA. SHARE$ 0TH SHARE$

0
0
2180 1744
436

FULTON 770680
STATUS:

SURVEILLANCE SYSTEM FOR THE ATLANTA INTERSTATES MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE

,/. /b)NG DIST. 5
;JJb souRdi}I2!t: MIT./AIR
FEbERALHfoHWAY ADMIN

PE NONE $ ROW NONE $
1995 $
FED SHARE $ GA. SHARE $ 0TH SHARE $

0 .0 6000
4800 1200

FULTON .770690
STATUS:

SURVEILLANCE SYSTEM FOR THE ATLANTA ARTERIAL SYSTEM MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: BURT RIDDLE LGPA NOT APPLICABLE

CONG DIST.

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $ GA. SHARE $
0TH SHARE $

0 0 5000 4000 1000

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

FULTON 770740
STATUS:

PURCHASE 10 CLEAN ENGINE MARTA BUSES VEHICLE PURCHASES/ CAPITAL PROJECT MILEAGE: .00 EXIST. LANES: MANAGER: UNKNOWN NOT APPLICABLE,

CONG DIST. 5 & 11
0
FUND soURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

FULTON 770741
STATUS:

MARTA ;_;;;:PRESS BUS ROUTE FOR MISCELLANEOUS IMPROVEMENTS/ PROJECT MILEAGE : ;OO MANAGER: UNKNOWN NOT APPLICABLE

CONG DIST. 5 & 4
0
FUND SOURCE: CONG,MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

FULTON 770742
STATUS:

MARTA EXPRESS BUS MISCELLANEOUS IMP~OVEMEN'TS
PROJECT MILEAGE: MANAGER: UNKNOWN NOT APPLICABLE

CONG DIST. 5 & 4 0
FUND SOURCE: CONG MIT./AIR QUAL FEDERAL HIGHWAY ADMIN FUNDS

FULTON 770330
STATUS:

OLYMPICS TRANSPORTATION PLANNING - 1995
!:~~iN~iE!~iI~E~~~N: 'xi~Ni~Es: o /PROPOsEp:ffi&j'f o MANAGER: LGPA NOT APPLICABLE

,.,,.,,A.,TLANTA TIP i R 149 {}\QONG DIST. 5
''')/;UNO SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS .

22-Feb-1994 Page 38

FISCAL YEAR

COST ESTS

PE NONE $

ROW NONE $

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 0 2366 1893
473

PE NONE $ ROW NONE $ CONST 1995 $
FED SHARE $ GA. SHARE $
0TH SHARE $

0 0 1546 1237
309

PE NONE $ ROW NONE $
CONST -1996 $ FED .SHARE$
GA. SHARE$ 0TH SHARE$

0 0
3554 2843
711

PE 1995

$

250

ROW NONE $

0

CONST NONE $

0

FULTON 77W330
STATUS:

OLYMPICS TRANSPORTATION PLANNING - 1996 FUNDING:,:.

PRELIMINARY ENGINEERING PROJECT MILEAGE : .00

/ PLANNING EXIST. LANES:

0

/PROPOSED

LANES,(O''

MANAGER:

LGPA NOT APPLICABLE

,..,,,:,:::::: ~::ANTA '.t~~[t R 149
,: :/CONG DI~fi??
FUND :sotradi: SURFACE Truu1sdtH< ifi:GHWAY AOMIN:idNos

PE 1996

$

250

ROW NONE

$

0

CONST NONE $

0

FULTON 7D7015
STATUS:

NORTH LINE EXTENSION - MEDICAL CENTER TO NORTH SPRINGS TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE

FULTON 7D7016
STATUS:

FIXED GUIDEWAY MODERNIZATION PROGRAM TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE-KISH LGPA NOT APPLICABLE

1995

$

FED SHARE$

GA. _SHARE $

0TH SHARE$

64264 51411
12853

:!ii!) CONGDIST.5&4

CAPITAL.l 995

$

FUND SOURCE: URBlill.TRANSIT DISC.
FEDERAL TRANSIT JffiMIN FUNDS

FED SHARE$ GA. SHARE$

0TH SHARE$

8494 6795
1699

,:

==

~

1

0



COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

FULTON 7D7017
STATUS:

PROCUREMENT OF 80 BUSES TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 39

FISCAL YEAR

COST ESTS

CONG DIST. 5 & 4

CAPITAL 1995

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

17600 14080
3520

FULTON 7D7019
STATUS:

NORTH LINE EXTENSION - MEDICAL TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 5 & 4

CAPITAL 1996

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

22564 18051
4513

FULTON 7D7101
STATUS:

FIXED GUIDEWAY TRANSIT PROJECTS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 5 & 4

CAPITAL 1996

$

FUND SOURCE: URBAN TRANSIT DISC.

FED SHARE $

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

0TH SHARE $

8494 6795
1699

FULTON 7D7143
STATUS:

PUBLIC TRANSIT SERVICE FOR FULTON
TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE

DIST. 5 & 4
SOURCE: URBAN TRANSIT TRANSIT ADMIN FUNDS

OPERATING 1995 $ FED SHARE $ GA. SHARE $ 0TH SHARE $

10344 5172
5172

FULTON 7D7154
STATUS:

LINE REHAB. /RENOV., RAIL CAR OVERHALL, TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE

CAP.

URBAN

TRANsif:

}

.... CAPITAL

1995

$

FED SHARE$

ADMIN ':Ftii4b

GA. SHARE$

0TH SHARE$

29976 23981
5995

FULTON 7D7165
STATUS:

PUBLIC TRANSIT SERVICE FOR FULTON AND DEKALB COUNTIES TRANSIT PROJECTS/ OPERATIONS FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE

i\4):,
SOURcil:F &kaAN TRANSIT
FEDERAL TRANSIT ADMIN

1996 $ FED SHARE$ GA. SHARE$ 0TH SHARE$

10344 5172
5172

FULTON 7D7176
STATUS:

RAIL CAR OVERHAUL, BUS PURCHASES, TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH LGPA NOT APPLICABLE

CAP.

MAINT.,

ETC.

CONG DIST.
FUND SOURCE: FEDERAL TRANSIT

CAPITAL 1996

$

FED SHARE$

GA. SHARE$

0TH SHARE$

29976 23981
5995

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

FULTON 7D7502
STATUS:

REGIONAL, FINANCIAL AND SHORT SPECIAL STUDIES/ PLANNING FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS
CONG DIST. 5
FUND SOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 40

FISCAL YEAR

COST ESTS

PLANNING 1995

-$

FED SHARE $.

GA. SHARE$

0TH SHARE$

1600 1280
320

FULTON 7D7503
STATUS:

REGIONAL, FINANCIAL AND SHORT SPECIAL STUDIES/ PLANNING FUNDS RECIPIENT: MARTA MANAGER: STEVE KISH

CONG DIST. 5
FUNDSOURCE: STATE FUNDS FEDERAL HIGHWAY ADMIN FUNDS

PLANNING 1996 $ FED SHARE $ GA. SHARE $
0TH SHARE $

1600 1280
320

FULTON 7V1026
STATUS:

ELDERLY AND DISABLED TRANSIT PROJECTS/ FUNDS RECIPIENT: MANAGER: STEVE KISH'

CONG DIST. 5

CAPITAL 1995

$ 131

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

105

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

13

0TH SHARE $

13

FULTON 7V1027
STATUS:

ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: AGENCIES IN FULTON COUNTY MANAGER: STEVE KISH

DIST. 5

CAPITAL i996.

$ 136

SOURCE:'ELDERLY & DISABLED FUND

FED SHARE $

109

TRANSIT ADMIN FUNDS

GA. SHARE $

13

0TH SHARE $

14





COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

GWINNETT HOV LUMP SUM SIGNING ON I-75 & 71297X HOV LANES/ SAFETY
PROJECT MILEAGE : .00 - EXIST. MANAGER: BURT RIDDLE STATUS:

SEE CLAYTON

ATLANTA TIP i R 73
CONG DIST. 6
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 712970 IS AN ASSOCIATED PROJECT.

GWINNETT SR 124 FM ROCKBRIDGE RD/DEKALB 72153X RECONSTRUCTION & WIDENING
PROJECT MILEAGE : .00 MANAGER: UNKNOWN STATUS:

ATLANTA TIP i GW 76
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS 721530 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 41

FISCAL YEAR

COST ESTS

PE 1993 UNDERWAY

ROW NONE

$

0

CONST 1995

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

PE 1992 ROW 1997 CONST

UNDERWAY

$

0

AFTER 97

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

HENRY 72148X
STATUS:

SR 138 FM WALT STEPHENS RD/CLAYTON TO RECONSTRUCTION & WIDENING. NO LANE PROJECT MILEAGE : .00 MANAGER: J. GARLAND

co

ATLANTA TIP# CL 31

CONG DIST. 3

FUND SOURCE: SURFACE TRANSPORT.
FEDERAL HIGHWAY ADMIN FUNDS 721480 IS AN ASSOCIATED PROJECT.

HENRY 73092X
STATUS:

PANOLA RD FM STAGECOACH RD RECONSTRUCTION & WIDENING PROJECT MILEAGE : .00 MANAGER: UNKNOWN

ATLANTA TIP# CL16/HE4 CONG DIST. 3
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 730920 IS AN ASSOCIATED PROJECT.

22--Feb-1994 Page 42

FISCAL YEAR

COST ESTS

PE 1992 ROW 1996 CONST

UNDERWAY

$

0

AFTER 97

PE ROW LOCL CONST

$

0

AFTER 97



"

r

=.,

cz=:,

~

COUNTY P.I.NO,

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

ROCKDALE SALEM RD FM FLAT SHOALS TO N/RR[INCL BR\@ I-20;RECST INTCH]

712090 RECONSTRUCTION & WIDENING FROM 2 LANES T,. 6 LANES.

PROJECT MILEAGE : . 60

...

MANAGER: BILL MOSKAL

STATUS: SIGNED BY COUNTY 5-28-85 FOR

ATLANTA TIP i R 1
CONG DIST. 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS 71Y090 IS AN ASSOCIATED PROJECT.

22-Feb-1994 Page 43

FISCAL YEAR

COST ESTS

PE 1986

UNDERWAY

ROW 1991

UNDERWAY

CONST 1995

$ 9352

FED SHARE $ 8417

GA. SHARE $

935

0TH SHARE $

ROCKDALE I-20/CONYERS@ WEST AVE 712240 INTERCHANGE/ RECST. OR REHAB.
PROJECT MILEAGE : . 00 - EXIS'l'i

3 /PROPOSED iJJfas: 5

STATUS: ~!~~R~YB~~~YMg;~NYERSi,if~f~J FOR UTILITIES

i .JI~ ROCKDALE PMl<ER RD FM CULPEP~~I ~ D @ MALCOLM INCL

120

712640 RECONSTRUCTION & WIDENING /FROM 2 LANES TO 4 LANESif:?'/c"'"'

PROJECT MILEAGE : . 72 MANAGER: BILL MOSKAL

:) \
' (i .

STATUS: CT REQ CO ROW, UTIL & PE 4-5'"9.~f CITY SGN

ATLANTA TIP i R 19
CONG DIST. 4
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP i RO 15
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FUNDS 71Y640 IS AN ASSOCIATED PROJECT.

PE 1986

UNDERWAY

ROW 1993

UNDERWAY

CONST 1995

$ 2423

FED SHARE $ 2181

GA. SHARE $

242

0TH SHARE $

PE LOCL

ROW LOCL

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

4663 3730
933

ROCKDALE PARKER RD FM CULPEPPER TO OAKLAND@ MALCOLM/BR 71Y640 BRIDGES/ NEW CONSTRUCTION
PROJECT MILEAGE: .00 MANAGER: BILL MOSKAL STATUS:
ROCKDALE SR 138 FM RELOC SR138@ SR 20 TO I-20 721580 RECONSTRUCTION & WIDENING FROM 4 LANES TO 6 LANES,
PROJECT MILEAGE : 1.26
STATUS: ~A~~~~T~D;Hg~i~ 2-4-91; CONYERS sGN PUBLIC UTIL 2;1,i/li'.J

FUND SOURCE: NAT'L HIGHWAY

FEDERAL HIGHWAY ADMIN FUNDS

)7f2640\ts ,,,....-:.

-::-:. AN ASSOCIATED PROJECT.

:;:.~~~~~s}~~~i RO 35
;;;bM66k8k; SURFACE TRANSPbiFi!'.<.
FEDERAL :HIGHWAY ADMIN ..... .

PE LOCL

ROW NONE

$

CONST 1995

$

FED SHARE $

GA. SHARE $

0TH SHARE $

0 1979 1583
396

PE 1993 ROW 1995 CONST

UNDERWAY $ 2390 AFTER 97

ROCKDALE SR 20@ BIG HAYNES CREEK NEAR WALTON CO LINE 730950 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: D. GODWIN STATUS: ROCKDALE SIGNED 10-27-92 FOR UTILITIES.

, i'X~TA TIP i J,ltf 42? /c;c:>NG DIST. 4 ... FBNo SOURcit:Mn:DGE PROGRAM FEDERAL RIGHWAY ADMIN FUNDS/

PE 1995 ROW 1997 ?})CONST

$

52

$

10

AFTER 97

ROCKDALE SR 138 FROM SIGMAN RD/SR 20 TO DENNARD RD 731040 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.75 MANAGER: D. CHURCH STATUS: COUNTY SGN 3-1-91 UTILITIES; REV REQ CITY DO UTIL 1-24-94

f h ATLANTA

i RO 13

CONG DIST. :.4

FUND SOURCE: NAT'!.:~:fdk:~y
FEDERAL HIGHWAY Af>M'IN. FUNDS
731045 IS AN ASSOC::!A1ED PROJECT.

PE 1993 UNDERWAY

ROW 1994

UNDERWAY

CONST 1995

$ 7628

FED SHARE $ 6102

GA. SHARE $ 1526

0TH SHARE $

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

ROCKDALE SR 138@ YELLOW RIVER
731045 REHAB. OF THE EXISTING BRIDGE(S). FROM f)!:LANEs TO 5 LANES. PROJECT MILEAGE: .00 MANAGER: D. CHURCH
STATUS: ROCKDALE SGN 3-1-93 FOR UTILITIES.

ATLANTA TIP i RO 46
CONG DIST. 4
FUND SOURCE: BRIDGE PROGRAM FEDERAL HIGHWAY ADMIN FUNDS 731040 IS AN ASSOCIATED PROJECT.

ROCKDALE SR 138/SR 20 FROM NORTH OF I-20/j/6::;~~
731047 RECONSTRUCTION & WIDENING FROMi/4 :i,i:;iil:s TO

iat STATUS: 2;;;ti:Eii~~i~:/:/92f!@S

UTIL/REFUSED ROW ,~[193

ATLANTA TIP i RO 13
CONG DIST. 4
FUND SOURCE: NAT'L HIGHWAY FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 44

FISCAL YEAR

COST ESTS

PE 1993

UNDERWAY

ROW NONE

$

0

CONST 1995

$

788

FED SHARE $

630

GA. SHARE $

158

0TH SHARE $

PE NONE ROW 1996 CONST

$

0

$ 5789

AFTER 97

ROCKDALE OLD COVINGTON HWY @ ROti~fi)ti,E INDUST. BLVD & FARMER/iw

742510 INTERSECTION IMPROVEMENT)JsAFETY

PROJECT MILEAGE : . 00 - EXtST . LANES: 2 /PROPO$!!lBi! Oilifs : 2

~:t~,~~/~8. STATUS:

~g~w!~w & UTIL;iis

.T&S il~I&

ROCKDALE 742810
STATUS:

ROCKDALE STANTON RD/CR 434 FM HONEY CREEK RD TO EBENEZ~:\tto 742820 RECONSTRUCTION & WIDENING FROM 2 LANES TO 4 LANES.
PROJECT MILEAGE : 2.55
MANAGER: BILL MOSKAL STATUS: CONTRACT REQ COUNTY DO DESIGN, ROW AND UTILITIES

ROCKDALE SIGMAN RD FM I-20 NORTH TO SR 20/138 (EAST LEG)

752210 CONSTRUCTION OF NEW ROUTE WITH 4 LANES PROPOSED.

PROJECT MILEAGE : . 2. 50

.

MANAGER: D. CHURCH (M)

STATUS: REQ CONYERS/ROW/UTIL/PE 2/93;ROCKDALE SGN 3-1-93 ROW/UTL/PE

ROCKDALE OLD COVINGTON HWY FM GREEN ST TO SR 138/20 752270 CONSTRUCTION OF NEW ROUTE WITH 2 LANES PROPOSED.
PROJECT MILEAGE : 00
MANAGER: D. CHURCH (M) STATUS: SEND LGPA IN 1996

ATLANTA TIP i RO 31
CONG.DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE NONE

$

0

ROW LOCL

CONST 1995

$

205

FED SHARE $

185

GA. SHARE $.

21

0TH SHARE $

FUND SOURCE: HWY.'SAFETY FEDERAL HIGHWAY ADMIN FUNDS

PE LOCL

ROW LOCL

CONST 1995 - $

401

FED SHARE $

361

GA. SHARE $

40

0TH SHARE $

FUND 16Wci = suRFAcE -rRiills~8k-r>
FEptJUili111GHWAY AriMp,1 F.umfa

PE LOCL

ROW LOCL

CONST 1997

f

FED SHARE $,

GA .. SHARE $

0TH SHARE$

2667 2134
986 1519

PE 1996 ROW. LOCL ........:::toNST
FUND SOURcf+ s6RFACE TRANSPORT'.
FEDERALliiGkWAY ADMIN FUNDS)
;t~: ~=: I .::,1~:~:,v. PE 1995 ROW LOCL CONST
FEDERAL HIGHWAY ADMik FUNDS

$

20

AFTER 97

$

10

AFTER 97

.

~

~

!..!.,.,,.!-~

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

ROCKDALE FLAT SHOALS ROAD@ OLD SALEM ROAD

752280 INTERSECTION IMPROVEMENT/ SAFETY

PROJECT MILEAGE : .43 - EXIST. LANES: 2 /?~<>POSED LANES: 5

MANAGER: D. GODWIN (C)

.J:J \

STATUS: COUNTY SIGNED CONTRACT FOR ROW, UTILI'J;:(tffi,f ~.E:,1-11-94

RPtfi,l;:: ROCKDALE EBENEZER RD/CR .,. FM STANTON

9
.:2~,/CR 438

752330 RECONSTRUCTION & WIDENING FROM 'i:(LANES TO 4 LANES ....

D~~i~~j STATUS: ~~;;M~~t:~gi#::

ig; & UTILITIES 2-9-~~t\

ATLANTA TIP f RO 25
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FUNDS
ATLANTA TIP f RTP-RO 24
CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. ~EDERAL HIGHWAY ADMIN FUNDS

ROCKDALE 752350
STATUS:

ATLANTA TIP f RO 24
CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY ADMIN FONDS

ROCKDALE KLONDIKE RD/CR 437 FM SMYRNA RD/CR 438 TO JOHNSON SPOJ[J }: !::{,::\ATLANTA TIP f RO 17

7 52390 RECONSTRUCTION & WIDENING FROM 2 LANES TO 3 LANES.

~E!~~:~i~t:~~~~~ STATUS:

OTIL & ALL CST OVER'HMi:~~~I i~6-94

.CONG DIST. 4
FUND SOURCE: SURFACE TRANSPORT. FEDERAL HIGHWAY ADMIN FONDS

:::::i:!:iii\::..

ROCKDALE HORST ROAD AT HONEY CREEK 752400 REPLACEMENT OF THE EXISTING BRIDGES(S). NO ADDED LANES.
PROJECT MILEAGE : .00 MANAGER: D. GODWIN (C) STATUS: REQ ROCKDALE DO ROW/UTIL/PE & PAY ROW OVER $293,000
ROCKDALE SMYRNA RD/CR 438@ KLONDIKE RD/CR 57 752410 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .20 - EXIST. LANES: 0 /PROPOSED. LANES: 0 MANAGER: D. GODWIN STATUS: REQ COUNTY DO ROW, UTIL, PE & ALL CONST OVER $90,000 10-5-93

< ~~~~~s;:l:~lt RO 49
FO;;~V:1: BRIDGE 0:':JttGHWAY
if W'i~iit.i'.p,~,5l\if JI!'
FUND SOUR#(#~- SAFETY
FEDERAL HIGHWAY ADMIN

ROCKDALE ROCKBRIDGE RD/CR 74@ MAIN ST IN CONYERS 752420 INTERSECTION IMPROVEMENT/ SAFETY
PROJECT MILEAGE : .38 - EXIST. LANES: 0 /PROPOSED LANES: 0
MANAGER: D. GODWIN STATUS: REQ COUNTY DO ROW, UTIL, PE & CONST OVER $225,000 10-5-93

ATLANTA TIP f RO
CONG DIST .-c::4 .
FOND SOURCE: HWY FEDERAL HIGHWAY

22-Feb-1994 Page 45

FISCAL YEAR

COST ESTS

PE LOCL

ROW LOCL

CONST 1995

$

506

FED SHARE $

455

GA. SHARE $

51

0TH SHARE $

PE LOCL ROW LOCL CONST 1997 $
FED SHARE $ GA. SHARE $ 0TH SHARE $

1835 1468
581 948

PE LOCL

ROW LOCL

CONST 1995

$

205

FED SHARE $

185

GA. SHARE $

95

0TH SHARE $

115

PE LOCL

ROW LOCL

CONST 1997

$

FED SHARE $

GA. SHARE $

0TH SHARE $

1977 1582
802 1197

PE LOCL

ROW LOCL

CONST 1997

$

557

FED SHARE$

446

GA. SHARE$

153

0TH SHARE$

264

PE LOCL

ROW LOCL

1995 $ 215

FED SHARE$

194

GA. SHARE$

104

0TH SHARE$

125

PE LOCL

ROW LOCL

CONST 1996

$

408

FED SHARE$

367

GA. SHARE$ 142

0TH SHARE$

183

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1Q95/FY 1997
COMMENTS

ROCKDALE FARMER RO/CR 439@ SIGMAN RD/CR 435 752440 INTERSECTION IMPROVEMENT/ SAFETY
PROJECTMILEAGE: .20 - EXIST. LANES: MANAGER: 0. GODWIN STATUS: REQ COUNTY DO ROW, UTIL, PE & CONST

10-5-93

ATLANTA TIP# RO 30 CONG DIST. 4
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS

22-Feb-l~i''' Page 46

FISCAL YEAR

COST ESTS

PE LOCL

ROW LOCL

CONST 1995

$

392

FED SHARE $

353

GA. SHARE $

173

0TH SHARE $

212

ROCKDALE SR 212 AT TUCKER MILL ROAD 752490 TURN LANES/ SAFETY
PROJECT MILEAGE : 7.00MANAGER: D. GODWIN STATUS: CONTACT TRAFFIC

ATLANTA TIP# R 40
CONG DIST. 4 0
FUND SOURCE: HWY. SAFETY FEDERAL HIGHWAY AOMIN FUNDS

PE 1994

UNDERWAY

ROW 1995

$

10

CONST 1996

$

231

FED SHARE $

208.

GA. SHARE $

23

0TH SHARE $

ROCKDALE ELDERLY AND 7Vl035 TRANSIT PROJECTS/
FUNDS RECIPIENT:. AGENCIES
MANAGER: STEVE KISH
STATUS:

CONG DIST. 4 .

CAPITAL 1995

$

10

FUND.SOURCE: ELDERLY & DISABLED FUND

FED SHARE$

8

FEDERAL TRANSIT AOMIN FUNDS

GA. SHARE$-

1

0TH SHARE $

1

ROCKDALE ELDERLY AND DISABLED VEHICLES ANO EQUIPMENT 7V1036 TRANSIT PROJECTS/ CAPITAL
FUNDS RECIPIENT: AGENCIES IN ROCKDALE MANAGER: STEVE KISH STATUS:

DIST. -4

CAPITAL 1996

$

10

FUND

FED SHARE:$

8

AOMIN FUNDS

GA. SHARE$

1

0TH SHARE$

1

. , \

,.



..,

~

~ 0

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

ALL 811010
STATUS:

STUDY OF AUTOMATIC MOTOR-CARRIER SPECIAL STUDIES/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: UNKNOWN LGPA NOT APPLICABLE

(ADVANTAGE I-75)

CONG DIST. 99
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 1

FISCAL YEAR

COST ESTS

PE 1995 ROW NONE CONST NONE

$ 2200

$

0

$

0

ALL 811020
STATUS:

RURAL !VHS I-85, I-16, I-95, MISCELLANEOUS IMPROVEMENTS/ PROJECT MILEAGE : .00 MANAGER: BURT RIDDLE LGPA NOT APPLICABLE

ALL 870010
STATUS:

TRANSPORTATION SPECIAL STUDIES PROJECT MILEAGE MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
0
FUND SOURCE: I-STATE MAINT. ~EDERAL HIGHWAY ADMIN FUNDS
CONG DIST. 99 FUND SOURCE: UNKNOWN FEDERAL HIGHWAY ADMIN FUNDS

PE 1994

UNDERWAY

ROW NONE

$

0

CONST 1995

$ 2310

FED SHARE $ 2310

GA. SHARE $

0TH SHARE $

PE 1995 ROW NONE CONST NONE

$ 3000

$

0

$

0

ALL 870020
STATUS:

TRANSPORTATION PLANNING AND MANAGEMENT SYSTEMS

SPECIAL STUDIES/ PLANNING

.

PROJECT MILEAGE : .00 - EXIST. LANES: 0

MANAGER:

LGPA NOT APPLICABLE

FUND SOURCE: UNKNOWN F,.E..D.E-R--A. -L. HIGHWAY ADMIN FUNDS

ALL 870021
STATUS:

TRANSPORTATION PLANNING AND MANAGEMENT SYSTEMS

6m:t \ SPECIAL STUDIES/ PLANNING
PROJECT MILEAGE : .00 - EXIST.

LANES:

0 /PROPOSED LANES:

\CQ~G DISff ~9

MANAGER:

FU;i:1gJMf: UNKNOWN

LGPA NOT APPLICABLE

F~,R~m}HIGHWAY ADMIN

PE 1996 ROW NONE CONST NONE

$ 3000

$

0

$

0

PE ROW NONE CONST NONE

$ 3000

$

0

$

0

ALL 8Vl011
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH LGPA NOT APPLICABLE

ALL 8Vl012
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 42 RURAL COUNTIES - NORTH GA. MANAGER: STEVE KISH LGPA NOT APPLICABLE

CAP.ITAL 1995

$ 297

idl-io SOURcif':ELDERLY & DISABLED itiND FED SHARE $ 238

FEDERAL. TRANSIT ADM IN FUNDS . /'''''"

GA. SHARE $

29

0TH SHARE$

30

CAPITAL 1996

$

FUND FED SHARE$

GA. SHARE$

0TH SHARE$

308 246
31'
31

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

22-Feb-1994 Page 2

FISCAL YEAR

COST ESTS

ALL 8Vl014
STATUS:

ELDERLY AND DISABLED VEHICLES AND TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 53 RURAL COUNTIES MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 99

CAPITAL 1995

$

187

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

150

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

18

0TH SHARE $

19

ALL 8Vl017
STATUS:

ELDERLY AND DISABLED TRANSIT PROJECTS/ FUNDS RECIPIENT: 45 MANAGER: STEVE KISH LGPA NOT APPLICABLE

ALL 8Vl018
STATUS:

ELDERLY AND DISABLED VEHICLES AND EQUIPMENT TRANSIT PROJECTS/ CAPITAL FUNDS RECIPIENT: 45 RURAL COUNTIES - SOUTH GA. MANAGER: STEVE KISH LGPA NOT APPLICABLE

CONG DIST. 99

CAPITAL 1996

$

194

FUND SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

155

FEDERAL TR?,NSIT ADMIN FUNDS

GA. SHARE $

20

0TH SHARE $

19

CONG DIST. 99

CAPITAL 1995

$ 212

FUND' SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

170

FEDERAL TRANSIT ADMIN FUNDS

GA. SHARE $

21

0TH SHARE $

21

DIST. 99 .

CAPITAL 1996

$ 220

SOURCE: ELDERLY & DISABLED FUND

FED SHARE $

176

TRANSIT ADMIN FUNDS

GA. SHARE $

22

0TH SHARE $

22

,.

..~

~
"'

C.Ji .. .1..tc.U~

~

! .


COUNTY P. I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

BIBB 811030
STATUS:

CALL BOXES ON I-16 FROM SR 87/BIBB TO MISCELLANEOUS IMPROVEMENTS/ SAFETY PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: BURT RIDDLE NOT APPLICABLE

CONG DIST. 1 & 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 3

FISCAL YEAR

COST ESTS

PE

$

ROW NONE $

CONST 1997 $

FED SHARE$

GA. SHARE$

0TH SHARE$

50
0
1660 14 94
166

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

CHATHAM 81103X
STATUS:

CALL BOXES ON I-16 FROM SR 87/BIBB TO UNKNOWN / UNKNOWN PROJECT MILEAGE: .00 - EXIST. LANES: MANAGER:

.. SEE BIBB

CONG DIST. 1 & 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 4

FISCAL YEAR

COST ESTS

PE

$

0

ROW NONE $

0

CONST 1997 $

0

FED SHARE$

GA. SHARE$

0TH SHARE$

~
....

t,.J.~i,.,o,,, ...;4

COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

LAURENS 81103Z
STATUS:

CALL BOXES ON I-16 FROM SR 87/BIBB TO UNKNOWN/ UNKNOWN
PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER:

CONG DIST. 1 & 8
FUND SOURCE: I-STATE MAINT. FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 5

FISCAL YEAR

COST ESTS

PE

$

0

ROW NONE

$

0

CONST 1997

$

0

FED SHARE $

GA. SHARE $

0TH SHARE $

..: ... ,

~

~





COUNTY P.I.NO.

DESCRIPTION PROJECT DATA

GEORGIA DEPARTMENT OF TRANSPORTATION DRAFT STATE TRANSPORTATION IMPROVEMENTS PROGRAM
PROJECT LISTING BY COUNTY FY 1995/FY 1997
COMMENTS

ALL NPSE95
STATUS:

LUMP SUM NATIONAL PARK SERVICE MISCELLANEOUS IMPROVEMENTS/ OTHER PROJECT MILEAGE : .00 - EXIST. LANES: MANAGER: LGPA NOT APPLICABLE

CONG DIST. 99
FUND SOURCE: NAT'L PARK SERVICE FEDERAL HIGHWAY ADMIN FUNDS

ALL NPSS95
STATUS:

LUMP SUM NATIONAL PARK SERVICE
MISCELLANEOUS IMPROVEMENTS/
PROJECT MILEAGE : .oo -
MANAGER: LGPA NOT APPLICABLE

95 CONG DIST. 99
0 FUND SOURCE: NAT'L PARK SERVICE FEDERAL HIGHWAY ADMIN FUNDS

22-Feb-1994 Page 1

FISCAL YEAR

COST ESTS

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

33

FED SHARE $

33

GA. SHARE $

0TH SHARE $

PE NONE

$

0

ROW NONE

$

0

CONST 1995

$

90

FED SHARE $

90

GA. SHARE $

0TH SHARE $