FOR THE
SIXTEENTH REPORT
OF THE
STATE HIGHWAY BOARD
OF GEORGIA
TO THE
GOVERNOR AND GENERAL ASSEMBLY
OF THE
STATE OF GEORGIA
FOR THE
FISCAL YEARS ENDING JUNE 30, 1935 AND JUNE 30, 1936
CONTENTS
PART ONE- INTRODUCTORY, COMMENTS AND GENERAL INFORMATION.
PART TWO- FISCAL YEAR ENDING JUNE 3oth, 1935. PART THREE- FISCAL YEAR ENDING JUNE 3oth, 1936.
PART ONE
INTRODUCTORY, COMMENTS AND GENERAL INFORMATION
To His ExcELLENCY, HoNoRABLE EuGENE TALMADGE, GoVERNOR OF GEORGIA, ATLANTA, GEORGIA. DEAR SIR:
In compliance with the law applying to the duties of the State Highway Board of Georgia, we are submitting to your Excellency for consideration, a brief report of the activities of the Board for the fiscal years ending June 30, 1935 and June 30, 1936.
The tables in this report give a comprehensive review of the activities of the State Highway Board for the two years covered in the report.
We wish to thank your Excellency for the splendid cooperation given us during our tenure of office.
Respectfully submitted, STATE HIGHWAY BOARD OF GEORGIA
ByVv. E. WILBURN, Chairman, MAx L. McRAE, Member, JOHN A. HECK, Member.
STATE HIGHWAY BOARD OF GEORGIA
HISTORY OF STATE HIGHWAY BOARD MEMBERSHIP 1916 THROUGH JUNE 30, 1936
The State Highway Department of Georgia was created by Act of Legislature, August 16, 1916, and a Highway Commission was appointed composed of the three members of the Prison Commission, together with the State Geologist, the Dean of the College of Civil Engineering of the State University, and the Professor of Highway Engineering at the Georgia School of Technology.
The original Highway Commission consisted of the following members:
T. E. PATTERSON, Chairman, Member of Prison Comm!sston.
E. L. RAINEY, l\Iember of Prison Commission.
J. E. DAVIDSON, Member of Prison Commission.
S. W. McCALLIE, State Geologist.
C. l\1. STRAHAN, Professor of Civil Engineering, State University.
R. D. KNEALE, Professor of Civil Engineering, Georgia School of Technology.
The above Commission served until the reorganization of the Highway Department, by Act of Legislature approved August 18, 1919.
This Legislature of 1919 provided that the State Highway Department of Georgia reorganized and reconstructed should be managed and controlled by the State Highway Board, which should consist of three members appointed by the Governor, one from each of three divisions of the State and the boundaries of each division were named. The term of office of initial appointees to be two, four and six years, after which each new member to serve s1x years.
The Appointments to the newly reorganized State Highway Board and their successors with term of office follows:
8
Name of Member
Title
Appointed By
Term Began Term Ended
Remarks
C. M. Strahan _________
Stanley S. Bennet ____
R. C. Neely ____________ John N. Holder_ ______ W. T. Anderson _______ Stanley S. Bennet_____ John R. Phillips ______ Sam Tate ________ W. C. Vereen __________ J. W. Barnett ________ J.P. Wilhoit___________
"' J.P. Wilhoit___________
J. J. Mangham ________ W. E. Wilburn _________ Max L. McRae ________ W. E. Wilburn _________ John A. Heck _________ John A. Heck _____ ---
-
Chairman __
Member ____
Member ____ Chairman __ Member ____ Member ____ Member ____ Chairman __ Member. ___ Chairman __ Member ____ Officer in
Charge ___ Chairman __ Member ____ Member ____ Chairman __ Member ____ Member ____
Governor Dorsey ___
Governor Dorsey ___
Governor Dorsey ___ Governor Hardwick Governor Walker ___ Governor Walker ___ Governor Walker ___ Governor Hardman Governor Hardman Governor Hardman Governor RusselL __
Governor Talmadge Governor Talmadge Governor Talmadge Governor Talmadge Governor Talmadge Governor Talmadge Governor Talmadge
Sept. 1, 1919__ Dec. 31, 192L Expiration of initial two year term.
Sept. 1, 1919__ Dec. 31, 1923_ Expiration of initial four year term.
Sept. 1, 1919__ Oct. 27, 1923_ Died in office. Jan. 1, 1922 _ June 2, 1929_ Succeeded C. M. Strahan. Nov. 1, 1923 __ July, 1925_ -- succeeded R. C. Neely. Jan. 1, 1924 __ Dec. 31, 1929 _ Reappointed. Aug. 1925 -- Dec. 31, 1933_ Succeeded W. T. Anderson. June 4,1929 Ar;ril1, 1930_ succeeded John N. Holder. Jan. 1, 1930 _ June 19, 1933 Succeeded Stanley S. Bennet. April1, 1930_ June 19, 1933 Succeeded Sam Tate. Jan. 1, 1932 __ June 19, 1933 Succeeded John R. Phillips.
June 19, 1933 July 20, 1933_ Appointed officer in charge. July 20, 1933_ Nov. 21, 1933_ Succeeded J. W. Barnett. July 20, 1933_ Nov. 21, 1933_ Succeeded J.P. Wilhoit. July 20, 1933_ Still in office succeeded W. C. Vereen. Nov. 21, 1933_ Still in office Appointed Chairman. Nov. 21, 1933_ Dec. 31, 1933_ Succeeded J. J. Mangham. Jan.1, 1934 __ Still in office Reappointed to full term.
OFFICIALS OF THE
STATE HIGHWAY DEPARTMENT
Name
Title
Location
W. E. Wilburn ________ Chairman, State Highway Board Atlanta Max L. McRae _______ Member, State Highway Board __ McRae John A. Heck ________ Member, State Highway Board__ Marietta F. P. Vanstory_______ Secretary and Treasurer, State
Highway Board ________________ Atlanta B.S. Miller_ __________ Assistant Attorney-GeneraL ____ Atlanta H. E. Newton_________ State Highway Engineer ________ Atlanta
10
ACCOUNTING
The section of this Annual Report devoted to statements from the Treasurer reflects the financial condition and activities of the State Highway Board for the fiscal years July 1, 1934 to June 30, 1935 and July 1, 1935 to June 30, 1936. The fiscal year ended June 30, 1935 is included in Part Two and the fiscal year ended June 30, 1936 is included in Part Three. Each section is composed of separate Exhibits and schedules for the year.
The financial condition of the State Highway Board, at the close of the fiscal year, is reflected in Exhibit "A," Statement of Assets and Liabilities. A Reconciliation of the Fund Surplus, reflecting Fund Revenues, Appropriations, and Allotments, is given in Exhibit "B." Exhibit "C" reflects Revenue Receipts and Expenditures. Exhibit "D" in Part Three is a Comparative Statement of Revenue Receipts and Expenditures for fiscal years ended June 30, 1933, 1934, 1935, 1936. These Exhibits are supported by various Schedules, which analyze the financial results for the fiscal years.
EXHIBIT "A"
STATEMENT OF ASSETS AND LIABILITIESFUND BALANCES
CURRENT FUND POSITION
A comparative summary as taken from Exhibit "A," of the current financial condition at June 30, 1935 and June 30, 1936, is presented as follo\\s:
Description
June 30, 1936
ASSETS Current Assets ________________ $7,263,570.05 Deferred Assets________________ 213, 830. 03
TOTAL ____________________ $7,477,400.08
LIABILITIES & FUND BALANCES
Current Liabilities ____________ $ 600, 000. 00 Fund Balances________________ 3, 827, 921. 84
TOTAL ____________________ $4, 427, 921. 84
FUND SURPLUS Available Surplus______________ $1,319,948.09 Surplus Deficit _______________ _ Surplus Reserves______________ 1, 729,530.15
TOTAL ____________________ $3,049,478.24
TOTAL ____________________ $7, 477, 400. 08
June 30, 1936
$6,702,483.65 215,633.91
$6, 918, 117. 56
$ 600,000.00 5,095,803.74
$5,695,803.74
$ 624,075.75 1,846,389.57
$1,222,313.82 $6,918, 117.56
11
The fund surplus balance at the close of the fiscal year constitutes State funds and is exclusive of the available balance of unallotted Federal funds. The available Federal funds (representing funds against which contracts had not been let) on June 30, 1935, amounted to $2,751,781.21 and on June 30, 1936, amounted to $12,265,599.96.
In arriving at the available surplus or deficit balance at the close of a fiscal year provision is made not only for all actual liabilities; but also, for contractual obligations not yet matured, including outstanding purchase orders, balance of specific allotments for State Force work, and surplus reserves. Consideration is given to amounts due from participating agencies only when corresponding contract is let and liability accrued. A surplus acts as an enhancement to the revenue for the succeeding year; whereas, a deficit is forwarded to the succeeding year as an encumbrance.
CAPITAL ACCOUNT POSITION
Capital investments, liabilities and surplus are shown in a
separate section of Exhibit "A" and are not considered in the
current financial position. The capital account items as of
June 30, 1936 are summarized as follows:
June 30,
Description
1936
---
CAPITAL INVESTMENTS
Land, Buildings and Equipment ____________ $ 1, 261, 293. 09
Roads and Bridges
Construction cost to date _________________ 154,290,541.24
W. & A. Rental Warrents__ _____ ________ __ ___ 1, 620, 000.00
Total Assets _____________________________ $157, 171, 834. 33
CAPITAL LIABILITIES Highway Refunding Certificates. ___________ $ 23, 957, 085.44
CAPITAL SURPLUS Surplus Invested in Plant and Equipment __ $ 1, 261,293.09 Surplus Invested in Highways _____________ _ 130,333,455.80 Surplus Invested in W. & A. Warrants _____ _ 1,620,000.00
Total Surplus __________________________ _ $133,214,748.89
Total Liabilities & Surplus ______________ $157, 171, 834. 33
Fixed Assets, representing land, buildings, and equipment, are appraised at the close of each fiscal year and their values adjusted through Surplus Invested in Plant and Equipment. Additions and replacements during the year are charged as outlay expenditures but capitalized at the close of the fiscal year and credited to Surplus Invested in Plant and Equipment.
Roads and Bridges, construction cost to date, represents total expenditures since the beginning of the State Highway Board of
12
Georgia. During the fiscal years ended June 30, 1935 and June 30, 1936, construction cost to date was increased in the amount of $21,915,902.54 as follows:
Roads & Bridges, construction Cost to June 30,1934 ___________ _
$132,374,638.70
Construction Expenditures Fiscal year ended June 30, 1935 __ Fiscal year ended June 30, 1936_ __ _
$ 11, 380, 060. 33 10,535,842.21
$ 21,915,902.54
Roads & Bridges, construction Cost to June 30, 1936
$154, 290, 541. 24
W. & A. Rental \Varrants represent \Vestern and Atlantic Railroad Rental Assignment \Varrants, due monthly from January 1, 1941 to December 1, 1943, inclusive, and purchased at face value by the State Highway Board of Georgia; in accordance with the provisions of an Act of the General Assembly of Georgia in 1931.
The Act provides that the Governor and the State Highway Board of Georgia are authorized to sell the warrants to match regular Federal Aid or any emergency fund which might be offered the State Highway Board by the Federal Government.
State of Georgia, Highway Department Refunding Certificates are in accordance with the provisions of an Act of the General Assembly of Georgia, approved ~larch 1, 1933, and as amended by another Act approved l\larch 22, 1933. These certificates are for the purpose of refunding to the several counties of this state and the Coastal Highway District, funds advanced for construction of roads on the State Highway System, under the supervision of the State Highway Department prior to September 1, 1931. Ten per cent of the total amount was due and payable on March .31, 1936 and each year thereafter for ten years. The certificates are transferable but non-interest bearing.
The total outstanding certificates on June 30, 1936, amounted to $23,957,085.44 as shown in Schedule No.5, Part Three.
Capital surplus which is a contra to capital investment accounts has been split into three accounts; namely, Surplus Invested in Flant and Equipment, $1,261,293.09, Surplus Invested in Highways, $130,333,455.80, and Surplus Invested in W. & A. Warrants, $1,620,000.00. Capital surplus represents the an;m:.nt from revenues invested in property and should not be confused with the current surplus, which is essentially a surplus of money, having to do with cash or with resources expected to become cash, such as accounts receivable and similar items.
13
EXHIBIT "B" RECONCILIATION OF FUND SURPLUS
This exhibit reconciles the Fund Surplus at the beginning of the year with the Fund Surplus at the close of the year, and thereby reflects the Fund Revenue as accrued, Appropriations, Allotments, and Reserves.
EXHIBIT "C" STATEMENT OF REVENUE RECEIPTS AND
EXPENDITURES REVENUE RECEIPTS
A comparative summary with relative percentages as taken from Exhibit "C," of the Revenue Receipts for fiscal years ended June 30, 1935 and June 30, 1936, is presented as follows:
Year Ended
I
Year Ended
__ Jun~ 30, 1935 __ i__~n~ 30, 1936
Description
Percent I
I Percent I
to Total . Amount to Total Amount
~~~!!~:~asurer ~~5% n[~7% 1
_
l$1o, 861, 127.
1$11, 796,406. 19
Counties, Cities '
1
& Railroads______ 00. 17 ..
28,446.52. 00.06
9,245.77
Federal
Government_____ 36.35 :1 6, 232,390.34 1 23.96
3,720,834.77
Miscellaneous
[
Income __________ 00.13 I
1
22,757.91 00.01
1,442.13
1
TOTAL __________ 10o:DQ%I$17,144,722.4sl 100. 00% 1$15,527,928.86
STATE FUNDS
Reveune receipts from State funds are entered on the records when credit is passed to the State Highway Board of Georgia by the State Auditor and not when the funds are remitted on executive warrant. This revenue therefore represents the State Highway Board's pro-rata share of collections as made by the State Treasurer and includes at all times the unremitted balance of State funds due to the State Highway Board of Georgia.
An analysis of State funds is as follows:
Description
Year Ended June 30, 1935
Year Ended June 30, 1936
Motor Vehicle Fees______________ $ l, 206, 051. 30 Gasoline Taxes__________________ 9, 655, 076. 41
$ 1,392,012.38 10,404,393.81
TOTAL ______________________ $10, 861, 227. 71
$11,796,406.19
14
Motor Vehicle Fees represent collections from motor vehicle license tags and common carrier mileage and license fees; as credited to the State Highway Board of Georgia. These credits reflect an increase for the year ended in 1936 as compared with the year ended in 1935 of $185,961.08.
Gasoline Taxes represent the State Highway Board's pro-rata share of collections under the Fuel Oil Tax Law. These credits reflect an increase for the year ended in 1936 as compared with the year ended in 1935 of $749,317.40.
COUNTIES, CITIES AND RAILROADS Revenue receipts from this source are analyzed as follows:
Description
Year Ended June 30, 1935
Year Ended June 30, 1936
Counties____________________
$17,900.40
Cities____________________________ 1,000.00
Railroads________________________ 9, 546. 12
$ 785.00 5,339.35 3, 121. 42
TOTAL ______________________ $28, 446. 52
$9,245.77
Revenue receipts from counties and cities represent contributions in connection with construction work; whereas, receipts from railroads reflect participation in the elimination of grade crossmgs.
FEDERAL GOVERNMENT
Revenue receipts from the Federal Government are analyzed as follows:
Description
Year Ended June 30, 1935
Year Ended June 30, 1936
National Recovery Vouchers ____ $6, 187, 103.47
Works Program Vouchers ______ _
Other Federal Vouchers_________
45, 286. 87
TOTAL______________________ $6, 232, 390. 34
$3,038,813.82
354,522.20
327,498.75
---
$3,720,834.77
Federal funds allotted to the State Highway Board of Georgia are considered under revenue receipts only as expenditures on Federal projects are made and the corresponding reimbursement vouchers are forwarded for collection to the Bureau of Public Roads.
Appropriations of Federal funds are recorded on the records as Estimated Revenue when notice of apportionment is received from the Bureau of Public Roads.
15
A reconciliation of unallotted balances, Federal funds, is as follows:
Description
Year Ended June 30, 1936
Year Ended June 30, 1936
Unallotted Balance beginning of year _____________ $3, 540, 810. 36
$ 2, 751, 781. 21
Federal Apportionments National Recovery Funds ____ _ National Forestry Funds. ____ _ Flood Relief Funds (Lapsed) __ Works Program Funds _______ _ Federal Aid Funds .. __________ _
5, 113, 491. 00 39,777.78 21, 624. 58Cr.
3,850.00 12, 171. 04Cr. 9,884,916.00 3, 168, 221. 00
TOTAL ________________ . _____ $8, 672, 454. 56 Allotted to Projects_____________ 5, 920,673.35
$15,796,597.17 3,530,997.21
Unallotted Balance end of year ___________ . _______ $2, 751, 781. 21
$12,265,599.96
The unallotted balance is dropped at the close of the fiscal year with the elimination of unrealized estimated revenues; however, it is included and recorded in the succeeding year as part of the estimated revenue for that year.
When contracts are let the Federal funds specifically allotted to the projects are recorded as Construction Estimated Participation. Reimbursement vouchers are credited and the balances adjusted to actual participation upon completion of the projects.
A reconciliation of the estimated participation accounts, Federal funds, is as follows:
Description
Year Ended June 30,1936
Estimated Participation beginning of year _____________ $3, 855, 717. 79
Allotted to Projects_____________ 5, 920, 673. 35
Year Ended June 30, 1936
$3,544,000.80 3,530,997.21
TOTAL ______________________ $9,776,391.14 Reimbursement Vouchers_______ 6, 232,390.34
$7,074,998.01 3,720,834.77
Estimated Participation end of year. ___________________ $3, 544, 000. 80
$3,354,163.24
The estimated participation balances on June 30th are shown in Exhibit "A" as a deduction from contractual obligations on Federal projects. This reduces the contractual obligations to a net State liability.
16
Federal funds apportioned to the State Highway Board of Georgia since the beginning of the Department are as follows:
Etegular__________________________ $36,927,494.80
National Etecovery, 1934. _________ 10,091,185.00 National Etecovery, 1935__________ 5, 113,491.00 Works Program__________________ 9, 884,916.00 Emergency Advance_____________ 2, 077,996.00 Emergency--------------------__ 3, 123,298.00 Flood EtelieL____________________ 471,371.88 National Forestry_______________ 114,659.62
TOTAL ____________ .. ________ $67, 804, 412. 30
The Federal Aid apportionment in the amount of $3,168,222.00 for fiscal year ended June 30, 193 7 has not been included in the foregoing figures.
MISCELLANEOUS INCOME
Represents revenue receipts from sundry and miscellaneous sources in the amount of $22,757.91 for fiscal year 1935 and $1,442.13 for fiscal year 1936.
EXPENDITURES
A comparative summary with relative percentages as taken from Exhibit "C," of the Expenditures for fiscal years ended June 30, 1935 and June 30, 1936, is presented as follows:
Description
Year Ended June 30, 1935
Percent I to Total Amount
I
Year Ended
I June 30, 1936
--~---
Percent
to Total I Amount
EXPENDITUEtES I Administration ______ 01. 85% $ 280, 061. 71
Construction________ 76.67 11, 619, 991. 31
Maintenance ________ 07.76
1,176,073.22
Land, Buildings &
Equipment ________ 00. 12
18,695.01
Legislative
Transfers__________ 13.60
2,060,606.62
Redemption of
Refunding
Certificates ________
I 01. 82% $ 274, 359. 58
71.06 10,746.251.51
09.14
1,382,836.80
00.07
11, 051. 25
00.40
60,597.73
17.51
2,648,765.80
-----
TOTAL ________ 100.00% $15,155,427.87 100.00% 1$15,123,862.67
~~~=
Comments upon the various expenditure classifications are next in order as they appear in the foregoing summary.
17
ADMINISTRATION
Administration is the function of management or direction and consists of the general planning, the establishing of policies, the issuance of orders and instructions, and the control of the forces and work which they are doing, both in the general office and division offices.
Administration expenditures are analyzed as follows:
Description
Year Ended June 30, 1936
General Administration General Office _________________ $197, 599. 85
Division Offices________________ 28, 760. 34 Warehouse_ ___________________ 13, 348. 89
TOTAL ____________________ $239,709.08
Research______________________ Collection of Revenue_________ Quarry________________________
175. 39 39, 020. 14
1, 157. 10
TOTAL_ ___________________ $280, 061. 71
Year Ended June 30, 1936
$187,368.42 29,513.22 13,547.32
$230,428.96
329.79 42, 181.59
- -1,-419.24
$274,359.58
The Administration cost for fiscal year 1935 expressed in percentage to total expenditures is 01.85% and for fiscal year 1936 the percentage is 01.82%.
Detail analyses of Administration expenditures may be found in Schedules No. 8-A and No. 10-A.
CONSTRUCTION Construction expenditures are analyzed as follows:
Description
Year Ended June 30, 1936
Surveys Actual Surveys ________________ $ Plans _________________________ _
TOTAL ____________________ $
151,592.66 88, 338. 32
239,930.98
Construction Supervision ____________________ $ 444,001.33
Direct _________________________ 10,936,059.00
TOTAL ____________________ $11, 380, 060. 33
TOTAL ____________________ $11, 619,991.31
Year Ended June 30, 1936
$ 117,193.39 93,215.91
$ 210,409.30
$ 427, 189. 58 10,108,652.63
$10,535,842.21 $10,746,251.51
18
Survey expenditures represent a preliminary construction cost. The charges are presented to show the cost of actual surveys separate from the cost of plans prepared in the General Office.
Detail analyses of Survey expenditures may be found in Schedules No. 8-B and No. 10-C.
Actual Construction expenditures are separated into two classes; namely, supervision charges and direct charges.
Supervision is the function of engineering and inspection and consists of furnishing inspection while the work is in process, testing materials, preparing monthly statements and reports, and such other operations of a strictly engineering nature.
Direct is the function of actual building costs for roads and bridges and consists of contractual payments, and in the case of work done by State forces, the furnishing of labor, materials, supplies, etc., used in the work.
Supervision cost for fiscal year 1935 as expressed in percentage to Construction direct expenditures is 04.06% and for fiscal year 1936 the percentage is 04.22%.
Construction allotments (representing estimated cost of work let to contract or begun by State forces) amounted to $11,300,914.13 for the fiscal year 1935 and $11,147,085.91 for the fiscal year 1936.
A summary of Construction balances, allotments and expenditures are as follows:
Description
Year Ended June 30, 1935
Year Ended June 30, 1936
Unexpended Balances, beginning of year _____________ $ 7, 152,344. 89
Construction Allotments ________ 11,300,914.13
$ 7,054,674.53 11,147,085.91
TOTAL ____________________ $18, 453,259.02 $18,201,760.44
Construction Expenditures _____ $11, 380, 060. 33 $10,535,842.21
Unliquidated Encumbrances____ 18, 524. 16
53,183.97Cr.
TOTAL ____________________ $11, 398, 584. 49 Unexpended Balances,
end of year ____________________ $ 7, 054,674.53
$10,482,658.24 $ 7,719,102.20
Detail analyses of Construction expenditures may be found in Schedules No. 8-B, No. 10-B, No. 12 and No. 13.
19
MAINTENANCE
Maintenance expenditures are analyzed as follows:
Description
Year Ended June 30, 1936
Year Ended June 30, 1936
General Supervision ___________________ $ 62, 910. 83 Direct _________________________ 1,098,943.18
$ 54,794.60 1,082,938.23
TOTALS___________________ $1,161,854.01
$1,137,732.83
Reconstruction
Supervision ____________________ $
16.72
Direct_ ________________________ 14, 202. 49
$ 2, 698.49 242,405.48
TOTALS_ __________________ $ 14, 219. 21 TOTALS ___________________ $1,176,073.22
$ 245,103.97 $1,382,836.80
Maintenance disbursements are divided into two sub-activities; namely, General Maintenance and Reconstruction.
General Maintenance represents the ordinary or routine maintenance work; whereas, Reconstruction represents special maintenance work consisting of extraordinary repairs, replacement or reconstruction. There is very little distinction between these two sub-activities as both reflect expenditures necessary in keeping each type of roadway, structures and facilities in"'?'a usable condition.
Maintenance expenditures are also separated as to supervision charges and direct charges. These two functions are the same as commented upon under Construction expenditures.
Detail analyses of Maintenance expenditures may be foundin Schedules No. 8-C, No. 10-D and No. 10-E.
LAND, BUILDINGS AND EQUIPMENT Land, Buildings and Equipment expenditures are as follows:
Description
Year Ended June 30, 1936
Land_____________________________ $ 150. 00 Buildings _______________________ _ Equipment______________________ 18, 545. 01
TOTAL____________________ $18,695.01
Year Ended June 30, 1936
$11,051.25 $11,051.25
Expenditures represent the purchase of additions and replacements and a detail analysis, classified as to detail object of expenditure and function to which assigned, may be found in Schedule No. 8-D.
20
LEGISLATIVE TRANSFERS
Legislative Transfers are analyzed as follows:
Description
Year Ended June 30, 1935
Year Ended June 30, 1936
Transfer to General Fund
1935 AcL ___ ------------------- $2, 000, 000. 00
Prison Farm Purchase- ---
546. 93
Motor Vehicle License Tags_____ 60,059.69
$ 2,775.00 57,822.73
TOTAL _______ - ____ - _-- ____ $2, 060, 606. 62
$60,597.73
Expenditures classi~ed as Tra~s~er To General Fund-1935 Act is in accordance w1th the prov1s1ons of an Act of the General Assembly of Georgia in 1935. The Act provides that the State Highway Board shall pay into the general fund of the State Treasurer, $2,000,000.00, of the State Highway funds.
Expenditures classified as Prison Farm Purchase represent payments made in accordance with the provisions of an Act of the General Assembly in 1931. This Act made available the amount of $200,000.00 from any funds allocated to the State Highway Board of Georgia, for the purpose of buying lands and equipping a prison farm. The fund to be expended when the same might be necessary in the judgment of the Prison Commission of Georgia and concurred in by the Governor.
Expenditures to June 30, 1936 are as follows:
Description
Amount
Allocation of funds ______________ _
Expenditures
For Fiscal Year 193L ____________ $ 2, 109.80
For Fiscal Year 1932 _____________ 124,186.93
For Fiscal Year 1933_____________ 5, 118.76
For Fiscal Year 1934_____________ 2, 719.85
For Fiscal Year 1935_____________
546.93
For Fiscal Year 1936_____________ 2, 775.00
$200,000.00 137,457.27
Unexpended balance, June 30, 1936
$ 62,542.73
The unexpended balance is carried in Exhibit "A" as a Fund balance.
Expenditures classified as Motor Vehicle License Tags represent transfers of funds to the Prison Commission and Revenue Commission to cover the cost of tags and postage. These transfers are in accordance with the provisions of an Act of the General Assembly.
21
REDEMPTION OF DEBT-REFUNDING CERTIFICATES
Expenditures classified as Redemption of Refunding Certificates, in the amount of $2,648,765.80, represent redemption of State of Georgia, Highway Department Refunding Certificates due on l\Iarch 25, 1936. Certificates due on March 25, 1936 but not presented for payment prior to June 30, 1936 amounted to $11,819.32.
GENERAL
Under this Budget System, the accounts in the Treasurer's Office are not limited to the actual assets and liabilities, but include resources in the form of unearned estimated revenue for the fiscal year; likewise, other obligations in the form of appropriations of these revenues, specific allotments of the appropriations and encumbrances of the allotments.
The accounts representing unrealized fund resources and the commitments of these resources are known as "Fund" accounts. These fund or budget accounts are necessary as the activities of the State Highway Board are carried on in accordance with limitations and estimates set up in the Budget.
A Balance Sheet and correlative statements are prepared monthly from the accounts. These financial statements are of great value as they reflect the exact financial condition on their respective dates; also, the budget position for the balance of the fiscal year.
All transactions affecting allotments, accounts payable, and disbursements, are recorded. By the use of collating forms several records are prepared in one operation and at the same time all account balances are automatically computed and all cofumns automatically totaled. Notwithstanding the fact that the volume of detail handled is very large, accurate statements are rendered promptly.
Additional analyses of all expenditures are obtained through the use of an electric tabulating machine in the Statistical Department. The detail expenditures and accumulated construction costs are analyzed so as to furnish information regarding source of funds, cost, location, type and mileage of projects; also, object of expenditure, unit and activity classifications.
At various times the Accounting Department is called upon for numerous financial and statistical reports which are compiled promptly and accurately without delay or confusion; however, the preparation of same would be very difficult without the present system and tabulating equipment.
An audit has been made of this Department by the State Auditor for the period ended December 31, 1935, and the records were found in order, all funds being properly disbursed. The fullest cooperation has been received from the State Auditor's office, and as stated in the last report, many beneficial suggestions were made by the examiners.
22
ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE
County
I I Eng. Cong. Com.
Div. Dist. Dist.
- -- -
Appling____ ------- --- 1 11
1
BBAaatkkcioenrns__o___n_________-_----
-----
-
-
-
-
-
-
-
-
1 1
1
11 11 2
1 1 1
BBaalndkwsi_n_____________________-_-_-_-_-_-_-
2 3
lO
9
2 3
Barrow __________________ 3
9
3
Bartow __________________ 3
7
3
Ben HilL ________________ 1
3
1
Berrien __________________ 1 11
1
Bibb ___________________
2
6
2
Bleckley ________________ 2 12
2
Brantley_________________ 1 11
1
Brooks________ .. __________ 1 11, 1
Bryan____________________ 1
1
1
Bulloch__________________ 2 1 2
Burke ___________________ 2
1
2
Butts ____________________ 2
6
2
Calhoun_________________ 1
2
1
Camden _________________ 1 11
1
Candler _________________ 2
1
2
CarrolL _________________ 3 4 3
Catoosa__________________ 3
7
3
Charlton __________ Chatham ____________
-
-
-
---
-
1 1
11 1
1 1
Chattahoochee__________ 2 4 2
Area Sq. Miles
454 330 271 357 307 222 168 471 256 455 277 205 434 514 431 668 956 203 284 711 228 492 169 792 370 218
Pop. Per
Per- Per- Per-
Pop. Sq. Mile
cent- cent- cent-
1930
1930 Mileage Mileage Mileage age age age
Census Census 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36
13,314
29
62.805 63.025 61.720 .7076 .6846 .6656
6,894
21
49.343 49.343 49.343 .5559 .5359 .5321
7,055
26
46.426 46.426 46.400 .5230 .5043 .5004
7,818
22
42.670 42.670 42.670 .4808 .4635 .4601
22,878
75
45.261 45.261 46.615 .5099 .4916 .5027
9,703
44
36.650 36.650 36.650 .4129 .3981 .3953
12,401
74
40.269 43.822 43.812 .4536 .4760 .4725
25,364
54
76.254 78.182 78.164 .8591 .8492 .8429
13,047
51
37.851 37.851 37.851 .4265 .4111 .4082
14,646
32
56.160 59.160 56.202 .6327 .6426 .6061
77,042
278
49.165 49.154 49.565 .5539 .5339 .5345
9,133
45
32.425 32.425 32.425 .3653 .3522 .3497
6,895
lR
53.884 53.884 53.884 .6070 .5853 .5811
21,330
42
76.385 76.245 76.245 .8606 .8282 .8222
5,952
14
62.056 71.938 71.938 .6991 .7814 .7758
26,509
40
88.128 106.410 106.275 .9929 1.1558 1.1461
29,224
31
93.092 93.092 93.092 1.0487 1.0112 1.0039
9,345
46
51.249 52.088 52.088 .5774 .5658 .5618
10,576
37
53.950 53.950 53.950 .6078 .5860 .5818
6,338
9
72.903 71.967 72.405 .8213 .7817 .7808
8,991
39
27.050 27.050 36.853 .3048 .2938 .3974
34,272
70
74.548 74.544 74.544 .8398 .8097 .8039
9,421
56
15.853 15.919 15.919 .1786 .1729 .1717
4,381
6
43.950 43.950 43.950 .4952 .4774 .4740
105,431
285
61.393 61.387 61.387 .6916 .6668 .6620
8,894
41
42.482 42.480 42.480 .47871 .4614 .4581
ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE
County
Eng. Cong. Com. Asrqe.a
Div. Dist. Dist. Miles
- -- -
Chattooga _______________ 3
7
3
328
Cherokee ________________ 3
9
3
4 29
Clarke ___________________ 3
8
3
l 14
Clay _____________________ 1
3
1
203
Clayton__________________ 3
6
3
142
CColibnbch_______________________________-_-_-_-
1 3
11 7
1 3
747 353
Coffee ___________________ 1 11
1
632
Colquitt_ _______________ 1
2
1
5 29
C C
ooolukm__b_i_a________-_-_-_-_-_-_-_-_-_-_-_-
2 1
10 11
2 1
3 50 2 41
Coweta __________________ 2
4
2
4 43
Crawford ________________ 1, 2
6
2
3 19
Crisp ________ Dade ________ Dawson______
-----------
-----------
-----------
1 3 3
3 7 9
1
3 3
2 77 186 2 16
DDeeKcaatlubr_______-_-_-_-_-_-_-_-_-_-_-_-_-_-
1 3
2 5
1 3
5 83 2 72
Dodge ___________________ 2 12
2
4 31
Dooly ___________ ________ I 2
3
2
3 97
Dougherty_______________ i 1
2
1
342
Douglas _________________ 3
5
3
2 08
Early ____________________ 1
2
1 ' 524
Echols ___________________ 1 11
1
3 62
Effingham ______________ 2
1
2
4 48
Elbert ___________________ 3
8
3
3 61
Pop. 1930 Census
Pop .Per
Per- Per- Per-
Sq. Mile
cent- cent- cent-
1930 Mileage Mileage Mileage age age age
Census 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36
15,407
47
20,003
47
25,613
225
6,943
34
10,260
72
7,015
9
35,408
100
19,739
31
30,622
58
8,793
25
11,311
47
25,127
57
7,020
22
17,343 I 63
4,146
22
3,502
16
23,622
41
70,278
258
21,599
50
18,025
45
22,306 I 65
9,461
46
18,273
35
2,744
8
10,164
23
18,485
51
46.380
56.579
35.886
37.411
38.772
69.311
60.992
60.195
78.858
52.513
44.470
78.155
62.820
41.651
24.100
44.104
70.600
42.218
79.677
67.615
51.262
I
34.925 69.440
62.900
44.254
74.952
46.380
56.579 35.524 37.411
37.603 69.273 71.107
60.747 78.858
52.513 44.463
86.395 62.820 41.941 24.100
44.104 70.918
45.456 83.386 67.614
51.257 34.922
69.470 62.847 44.272
74.952
46.271 56.490 36.021
37.411 37.603
69.273 71.528 60.747
78.858 52.512
44.329 86.395 62.820
41.941 24.100
44.042 70.918
46.506 83.386 67.614
51.257 34.922
69.470 62.847 44.290
75.080
.5225 .6374 .4043
.4215
.4368 .7808
.6872
.6781 .8884 .5917
.5010 .8805
.7077 .4692
.2715 .4969
.7954 .4756 .8977
.7617 .5776
.3934 .7823 .7087
.4985 .8445
.5037 .6146
.3859 .4063
.4085 .7524 .7724
.6598 .8566
.5704 .4829 .9384
.6824
.4555 .2618 .4791
.7703 .4937 .9058
.7344
.5567 .3793 .7546
.6827 .4809 .8141
.4990 .6092
.3885
.4034 .4055 .7471
.7714 .6551 .8504
.5663
.4780 .9317 .6775
.4523 .2599
.4750 .7648 .5015
.8992 .7292
.5528 .3766
.7492 .6777 .4777 .8096
ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE
County
Area Eng. Cong.l Com. Sq. Div. Dist.i Dist. Miles
EmanueL _______________ 2 12
2
764
Evans ____________________ 1
1
1
287
Fannin __________________ 3
9
3
401
Fayette__________________ 2
6
2
234
Floyd ____________________ 3 7 3 502
Forsyth__________________ 3
9
3
247
Franklin_________________ 3
8
3
279
Fulton_________________ . _ 3
5
3
541
Gilmer_ __________________ 3
9
3
440
Glascock ________________ 2 10
2
170
Glynn ___________________ 1 11
1
439
Gordon __________________ 3
7
3
375
Grady ___________________ 1
2
1
444
GGrweiennnee_t_t____-_-_-_-_-_-_-_-_-_-_-_-_-_-
3 3
8 9
3 3
416 440
Habersham______________ 3
9
3
290
HHaanlLco_c-k--_-_-_-_-_-_-__-_-_-_-_-_-_-_-_-_-
3 2
9 10
3 2
437 530
Haralson ________________ 3 7 3 284
Harris ___________________ 2
4
2
501
Hart _____________________ 3
8
3
261
Heard ___________________ 2
4
2
285
Henry ___________________ 3
6
3
324
Houston_________________ 2 12
2
443
Irwin ____________________ 1 11
1
378
Jackson _________________ 3
9
3
355
Pop. Per
Per- Per- Per-
Pop. Sq. Mile
cent- cent- cent-
1930
1930 MUoagoiMlloa..IMlloago age age age
Census Census 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36
24,101
7,102 12,969
8,665 48,667 10,624 15,902
335,220 7,344 4,388
19,4.00 16,846 19,200
12,616 27,853 12,748
30,313 13,070
13,263 11,140
15,174 9,102 15,924
11,280 12,199
21,609
32 116.232 120.291 120.291 1.3094 1.3066 1.2973
25
20.578 28.478 38.621 .2319 .3093 .4165
32
45.008 38.64.8 38.532 .5070 .4198 .4155
37
23.610 45.370 45.370 .2660 .4928 .4893
97 88.367 88.367 88.367 .9956 .9598 .9530
43
37.390 37.390 37.488 .4212 .4062 .4042
57
60.840 60.823 60.823 .6854 .6606 .6560
620
90.572 99.685 99.449 1.0204 1.0828 1.0724
17
58.409 58.409 58.415 .6581 .6344 .6300
26
30.875 30.875 30.875 .3478 .3354 .3330
44
53.792 54.135 54.135 .6060 .5880 .5838
45
56.245 56.287 56.287 .6337 .6114 .6070
43
73.527 73.913 73.913 .8283 .8028 .7971
30
60.300 60.300 58.808 .6794 .6550 .6342
63
94.020 107.005 107.880 1.0592 1.1623 1.1634
44
59.570 59.570 59.557 .6711 .6471 .6423
69
75.970 75.970 75.931 .8559 .8251 .8188
25
62.800 74.620 74.679 .7075 .8106 .8054
47
36.065 36.062 36.062 .4063 .3917 .3889
22
67.060 66.329 66.329 .7555 .7204 .7153
58
57.940 58.247 58.247 .6528 .6327 .6281
32
45.570 45.570 45.570 .5134 .4950 .4915
49
61.890 61.895 61.895 .6972 .6723 .6675
26
63.850 63.846 63.846 .7194 .6935 .6885
32
56.330 56.330 56.028 .6346 .6118 .6042
61
72.003 84.103 84.264 .8112 .9136 .9087
ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE
I
County
I I I Area
Eng.ICong.[ Com. Sq. Div. Dist. Dist. Miles
1
Jasper ______ .
--------
2
6
2
321
Jeff Davis __ _ ------ . - 1
11
1
300
Jefferson___ _ --------- 2 10
2
646
Jenkins _______ _ --------
2
1
2
342
Johnson ____ _ --------- 2 12
2
292
Jones Lama
______ . r _________
_------------------
2 2
6 6
2 2
377 184
Lanier _________ _--------- 1 11
1
191
""
Cl
Laurens _______ Lee ____________
__------------------
2 1
12 3
2 1
806 326
Liberty ________ L i n c o l n ________ Long___________
___---------------------------
1
3 1
1
10 1
1
3 1
543
291 393
Lowndes_______ Lumpkin ______ Macon_________
___---------------------------
1
3 2
11
9 3
1
3 2
483 280
332
M M
a a
diso rion
n _______ ________
__------------------
3 2
8 4
3 2
284 360
McDuffie ______ M c i n t o s h ______
__----------
-----
-
2 1
10 1
2 1
287 470
M e r i w e t h e r ____ Miller_ _________ Mitchell _______ Monroe ________
____--------------------------------
-
-
-
2 1
1 2
4 2 2 6
2 1 1
2
496
253 548 470
MMoorngtgano_m__e_r_y________--
------
-------
-
-
1 3
12 8
1 3
190 390
IPop. Per I
Per- Per- Per-
Pop. Sq. Mile
cent- cent- cent-
1930
1930 Mileage Mileage Mileage age age age
Census Census 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36
8,594 8,118 20,727
12,908 12,681
8,992 9,745
5,190 32,693 8,328 8,153
7,847 4,180
29,994 4,927 16,643 14,921
6,968 9,014
5,763 22,437
9,076 23,620 11,606 10,020
12,488
27 59.151 59.151 59.115 .6664 .6425 .6375
27
22.560 22.534 22.534 .2541 .2447 .2430
32 101.400 98.055 98.048 1.1424 1.0651 1.0574
38
56.412 56.412 56.346 .6356 .6127 .6077
43
58.575 58.733 58.733 .6599 .6380 .6333
24
63.809 63.809 63.747 .7188 .6931 .6875
53
48.071 48.106 48.106 .5416 .5225 .5188
27
40.820 41.205 39.584 .4599 .4476 .4269
41 113.369 137.069 137.069 1.2772 1.4888 1.4782
26
33.117 33.120 33.120 .3731 .3598 .3571
15 35.830 53.330 53.330 .4037 .5792 .5752
27
48.300 48.300 48.300 .5441 .5247 .5208
11
43.947 43.947 43.947 .4951 .4773 .4740
62
84.090 99.317 99.317 .9474 1.0788 1.0710
18 58.349 61.549 61.549 .6574 .6685 .6638
50
69.757 84.757 82.919 .7858 .9207 .8942
53
76.750 76.505 76.505 .8647 .8310 .8250
19
34.550 47.250 47.250 .3893 .5132 .5096
31
48.479 48.479 46.490 .5461 .5266 .5014
12
33.006 33.006 49.806 .3719 .3585 .5371
45
66.116 96.816 96.816 .7448 1.0516 1.0441
36
46.380 46.380 46.380 .5226 .5038 .5001
43
85.292 86.998 90.248 .9609 .9449 .9733
25
71.623 71.723 71.723 .8069 .7791 .7735
53
46.802 46.802 46.802 .5272 .5084 .5047
32
65.292 65.292 64.120 .7356 .7092 .6915
ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE
I
i
County
Eng. Cong. Com.
Div. Dist. Dist.
- -- -
ndurray __________________ 3
7
3
nduscogee___ . ____________ 2
4
2
Newton___________________ 3
8
3
Oconee ____________ ----
3
8
3
Oglethorpe. ____________ 3 8 3
Paulding________________ 3 I 7
3
Peach ______ .. _.. ________ 2 12
2
Pickens______ .. _. ________ Pierce ___________________
3 1
9 11
3 1
Pike _______ . __ .. _________ 2
6
2
PPPuoulltakns.akmi--_._-_-__-__-__-.__-_-._.-_-__-___-__-_-_--_--_--_--
3 2 2
7 12 8
3 2 2
Quitman ______ .. ________ 1 3 1
Rabun. __________________ 3
9
3
Randolph______________ .. 1 3 1
Richmond _______________ 2 10
2
Rockdale ________________ Schley ___________________
3 2
5 3
3 2
Screven__________________ 2
1
2
Seminole ________________ 1
2
1
Spalding_________________ 2
6
2
Stephens ________________ Stewart __________________
3 1
9 3
3 1
Sumter___________________ 1
3
1
Talbot. __________________ 2
4
2
Area Sq. Miles
342 235 262 172 504 324 179 231 345 237 317 258 361 144 377 412 319 119 154 794 240 209 166 411 456 312
Pop.Perj
Per- Per- Per-
Pop. Sq. Mile
cent- cent- cent-
1930
1930 Mileage Mileage Mileage age age age
Census Census 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36
9,215
27
51.616 51.616 51.616 .5815 .5606 .5566
57,558
245
64.792 64.558 64.628 .7300 .7012 .6970
17,290
66
67.782 67.782 67.699 .7636 .7363 .7301
8,082
47
50.760 50.598 49.266 .5719 .5496 .5313
12,927
26
58.500 58.500 57.341 .6590 .6354 .6183
12,327
38
54.377 54.377 54.377 .6127 .5906 .5864
10,268
57
30.090 30.090 30.813 .3390 .3269 .3323
9,687
42
55.080 55.080 54.677 .6205 .5983 .5897
12,522
36
42.111 42.091 42.091 .4744 .4571 .4539
10,853
46
38.942 38.942 38.942 .4387 .4230 .4200
25,141
79
57.496 57.496 57.496 .6478 .6246 .6200
9,005
35
55.236 55.136 55.136 .6223 .5988 .5946
8,367
23
58.790 58.790 58.289 .6623 .6386 .6286
3,820
27
36.660 36.660 36.660 .4130 .3982 .3954
6,331
17
58.559 58.559 58.518 .6598 .6361 .6310
17,174
42
40.174 40.174 40.174 .4526 .4363 .4333
72,990
229
68.835 68.835 68.985 .7755 .7477 .7439
7,247
61
26.385 26.385 26.385 .2972 .2866 .2846
5,347
35
28.803 28.803 28.803 .3245 .3129 .3106
20,503
26
74.803 74.803 74.803 .8427 .8125 .8067
7,389
31
25.500 25.487 25.487 .2873 .2768 .2748
23,495
112
40.382 48.?64 48.264 .4550 .5243 .5205
11,740
71
32.548 32.548 32.548 .3667 .3535 .3510
11,114
27
67.300 67.300 66.974 .7582 .7310 .7223
26,800
59
75.718 75.718 76.493 .8530 .8225 .8249
8,458
27
67.446 67.446 67.081 .7599 .7326 .7234
ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE
i
I
1
[
IPop. Per 1
Area Pop. , Sq. Mile ,
I
Per- Per- Per-
cent- cent- cent-
County
Eng. Ieong. Com.[ s.q. I 1930
1930 Mileage Mileage,Mileage age age age
Div. 1 Dist. Dist. M1les Census Census 1 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - . - - - - - 1~-- - - - - - - - - - - - - -.-~.. ~---
Taliaferro_______________ 3 10
3
212
6,172
29 124.986 34.286 34.286 .2814 .3724 .3698
TattnalL ________________ 1
1
1
466 15,411
33
68.860 79.302 79.302 .7758 .8613 .8552
Taylor___________________ 2
3
2
340 10,617
Telfair..__________________ 1 12
1
373 14,997
31
67.760 71.060 71.342 .7634 .7719 .7694
1
40 \70.632 70.337 91.537 .7958 .7640 .9871
TerrelL_________________ 1
3
1
322 18,290
52
54.068 55.454 55.405 .6091 .6023 .5975
Thomas________________ 1
2
1
530 32,612
62 190.826 91.169 91.169 1.0232 .9903 .9832
Tift______________________ 1
2
1
243 16,068
66 I 56.690 57.147 57.147 .6387 .6207 .6163
Toombs_ ________________ 1 12
1
393 17,165
44
60.141 60.141 67.139 .6776 .6533 .7240
Towns ___________________ 3
9
3
181
4,346
24
38.330 38.330 38.330 .4318 .4163 .4134
Treutlen_________________ 2 12
2
262
7,488
29
27.900 27.900 27.900 .3143 .3031 .3009
Troup ___________________ 2
4
2
435 36,752
85
77.900 80.378 80.378 .8776 .8730 .8668
~ Turner__________ _______ 1
3
1
231 11,196
49
34.218 34.206 34.206 .3855 .3716 . 3689
Twiggs____________ ____ 2 12
2
314
8,372
27
51.398 55.348 55.112 .5791 .6012 .5943
Union___________________ 3
9
3
324
6,340
20
44.160 44.160 44.191 .49751 .4796 .4766
Upson__________ _______ 2
6
2
317 19,509
62
63.100 63.100 63.100 .7109 .6854 .6804
Walker___________________ 3
7
3
432 26,206
61
56.563 56.563 56.462 .6372 , .6144 .6089
Walton_________________ 3
8
3
331 21,118
64
72.916 72.916 73.930 .8215 .7920 .7973
Ware_____________________ 1 11
1
771 26,558
34
81.254 81.254 81.254 .9154 .8826 .8763
Warren__________________ 2 10
2
404 11,181
28
46.510 46.510 46.495 .5240 .5052 .5014
Washington_______ _____ 2 10
2
669 25,030
37
91.996 91.996 91.091 1.0364 .9993 .9823
Wayne______________
1 11
1
615 12,647
21
75.459 75.459 75.503 .8502 .8196 .8143
Webster_________________ 1
3
1
302
5,032
Wheeler_________________ 1 White___ ________ _ _____ 3
I 12
1
9
3
264 245
9,149 6, 056
17 35
I 24.110 31.110 39.606 . 2716 . 3379 .4271
46 339 58.389 58.389 .5220 .6342 .6297
25
44. 900 53. 150 53 .127 .5059 .5773 .5729
Whitfield_ __
_ ____ 3
7
3
283 20,808
74
47.109 47.617 47.617 .5307 .5173 .5135
Wilcox_____________ _____ 1 12
1
403 13,439
33
44.290 44.290 44.290 .4990 .4810 .4777
Wilkes_ -----------------~ 3 Wilkinson____________ 2
I 8
3 I 458
10
2
472
15,944 10,844
35
59 347 59.347 59.807 .66861 .6447 .6449
23
58.999 70.349 70.347 .6647 .7641 .7587
Worth_____ _________1_ _z_ _1_l_6~_ ____::.o94_ _ _~_ 63.870 64.175 64.175 __2196 .6971)~921
TOTALs __________ _I
1
I
I
I 158,725 2,908,506
49.5 18,876.218:9,206.429,'9,272.80710o.oooo/wo.oooowo.oooo
DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1934, JUNE 30, 1935, AND JUNE 30, 1936
County
' Total-Year Total-Year I Total-Year
Ending 6-3Q-34 Ending 6-30-35 Ending 6-30-36
----------------I
1
Appling ___ -----_-_-__ $ 15,763.75 $ 16,777.49 $ 17,743.93
Atkinson------_-----
12,429.33
13,169.40
14,033.35
Bacon- --------------
9,954.99
12,390.88
13,201.70
Baker----------------
10,748.42
11,388.42
12,135.51
Baldwin_------------
11,401.09
12,079.95
13,256.03
Banks---------------
9,232.01
9, 781.71
10,423.42
Barrow - - --------- ---
10,143.60
11,695.88
12,462.37
Bartow--------------
19,208.11
20,737.78
22,232.77
Ben HilL------------
9,534.53
10,102.25
10,764.98
Berrien ___ -_--- __ ----
14,146.50
15,789.53
16,214.39
Bibb_----------------
12,384.48
13,120.47
14,042.28
Bleckley _________ - ---
8,167.75
8,654.08
9,221.79
Brantley-------------
12,884.17
14,381.38
15,324.82
Brooks___ -----------Bryan ____________ --Bulloch_____________ _
19,163.55 15,631.70
21 '749 .42
20,358.78 19,202.35 28,741.75
21,684.39
20,459.46 30,244.74
Burke_-------------Butts _____________ --Calhoun____________ _ Camden ____________ _
23,449.54 10,248.46 13,589.81 18,364.01
24,845.82 13,812.51 14,399.00
19,270.09
26,475.74 14,814.04 15,343.58 20,528.32
Candler_ ____________ _
6,813.80
7,219.53
10,480.52
CarrolL ____________ _ Catoosa ____________ _
18,778.37 3,993.31
19,895.45 4,244.30
21,200.61 4,527.43
Charlton ___________ _ 11,049.69
11,730.05
12,499.56
Chatham___________ _ 14,884.12
16,384.72
17,458.70
Chattahoochee_____ _ 10,701.05
11,337.85
12,081.49
Chattooga__________ _ 11,682.97
12,378.60
13,175.56
Cherokee ___________ _ Clarke ______________ _ Clay ________________ _
14,252.05 9,039.56
9,423.69
15,100.66
9,636.99 9,984.81
16,198.74 10,224.80
10,639.84
Clayton_____________ _ Clinch ______________ _ Cobb _______________ _
9,766.53 17,459.19
14,633.06
10,272.07
18,491.17 18,978.12
10,694.44
19,701.53 20,351.34
Coffee ______________ _ 15,094.04
16,138.25
17,276.70
Colquitt_ __________ _ 19,679.51
21,046.82
22,427.54
Colurnbia___________ _ Cook________________ _ Coweta _____________ _ Crawford ___________ _
13,227.84 11,201.83 19,686.96 15,824.13
14,015.47 11,867.92
21,347.64 16,766.35
14,934.70 12,634.94
24,571.10 17,866.26
Crisp __________ -----Dade________________ _
10,491.74 6,070.70
11' 154.54 6,432.18
11,928.18 6,854.13
Dawson _____________ _ Decatur ____________ _ DeKalb _____________ _ Dodge ______________ _ Dooly _______________ _
11,109.64
17,783.89 10,634.55
17,530.47 17,031.97
11 '771.16 18,906.47 11,489.59 21,663.92 18,046.00
12,535.42
20,169.36 13,146.24 23,715.31
19,229.70
Dougherty__________ _ 12,756.30
13,680.58
14,577.69
Douglas ____________ _ Early _______________ _
Echols ______________ _ Effingham _________ _ Elbert ______________ _
8,018.67 17,491.68 15,844.28
10,508.72 18,880.13
9,320.52
18,539.21 16,780.75
11,813.56 20,004.33
9,931.97 19,757.55 17,873.94
12,592.55 21,326.71
EmanueL ___________ _ Evans _______________ _
29,278.43 5,183.53
31,299.81 7,614.20
34,211.24 10,992.29
29
DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1934, JUNE 30, 1935,
AND JUNE 30, 1936
County
I Total-Year I Total-Year Total-Year Ending 6-3o-34 Ending 6-3o-35 Ending 6-30-36
Fannin ______________ $ Fayette______________ Floyd ________________ F o r s y t h ______________ Franklin _____________ Fulton _______________ Gilmer _______________
Glascock ____________ Glynn _______________ Gordon ______________ Grady _______________ Greene ______________ Gwinnett ____________ H a b e r s h a m __________ HalL ________________
Hancock _____________ Haralson ____________ Harris _______________ IIart _________________ Heard _______________
IIenry _______________ Houston_____________ Irwin ________________
Jackson _____________ Jasper _______________
Jeff Davis ___________ J e f f e r s o n ____________ Jenkins ______________ Johnson _____________ Jones ________________ Lamar _______________ Lanier _______________ Laurens _____________ Lee __________________
Liberty ______________ Lincoln ______________ Long_________________
Lowndes _____________ Lumpkin ____________ Macon _______________ Madison _____________ Marion ______________ McDuffie ____________ Mcintosh ____________ M e r i w e t h e r __________ Miller_ _______________
Mitchell _____________ Monroe ______________
Montgomery ________ M o r g a n ______________
Murray ______________
Muscogee ____________ N e w t o n ______________ Oconee ______________
11,337.35 5,947.27 22,259.32 9,418.39 15,325.39 22,033.32 14,713.01 6,852.79 13,550.01 14,167.91 18,521.18 15,189.35 23,683.30 15,005.46 19,136.57 15,819.10 9,084.64 15,095.29 14,594.88 11,478.91 13,980.09 16,083.58 14,189.34 18,137.30 14,899.92 5,682.78 25,542.29 14,209.98 14,785.20 16,073.25 11,209.52 10,282.41 28,644.68 8,009.68 8,818.65 11,016.07 11,305.92
21' 181.97 14,697.91 17,571.54 19,333.04 8,703.02
11' 196.91 8,314.09 16,654.38 11,682.96 21,627.01 18,041.59 11,901.13 16,446.82 13,001.88 16,320.86 13,511.94 12,786.25
30
$ 11,576.77 9,976.27 23,584.74 9,979.22 16,233.36
26,252.63 15,589.09 8,240.38 14,425.49
15,019.94 19,701.27 16,093.79
28,559.14 15,898.95 20,276.04 18,313.02
9,624.79 17,847.93
15,545.85 12,162.42 16,520.95 17,040.72
15,034.22 22,446.69 15,787.12
6,019.39 26,376.91 15,056.10
15,644.22 17,030.32 12,832.82
10,995.09 33,369.52
8,839.70 14,233.52 12,891.04
11 '729 .25 26,264.44 16,427.14
20,587.36 20,418.82 10,888.78
12,938.82 8,809.15 19,748.98
12,378.60 23,219.35
19,128.98 12,491.24 17,426.12
13,776.06 17,245.86
18,090.71 13,504.36
$ 10,975.57 12,903.39 25,131.92 10,647.41
17,298.29 28,317.21
16,612.59 8, 780.97 15,396.20 16,008.24
21,021.16 16,834.58
30,615.70 16,939.21 21,602.84
21,226.85 10,256.18 18,864.24
16,565.67 12,960.30 17,603.19
18,158.05
15,996.77 23,931.87 16,819.96 6,408.75
27,885.25 16,034.66 16,703.90
18,129.90 13,681.54
11,376.66 38,982.97 9,419.45
15,167.27 13,736.72 12,498.70
28,246.15 17,505.51 23,850.85
21,758.34 13,438.09 13,367.71
10,706.25
27,534.85 13,190.65 25,666.89
20,398.30 13,310.67 18,471.09
14,679.80 18,370.25
19,253.86 14,011.45
DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1934, JUNE 30, 1935, AND JUNE 30, 1936
County
Total-Year I Total-Year Total-Year Ending 6-3Q-34 Ending 6-3o-35 Ending 6-3Q-36
Oglethorpe__________ $ Paulding ___________ _ Peach_______________ _
Pickens _____________ -~' Pierce ______________ _ Pike ________________ _ Polk ________________ _
Pulaski _____________ _ Putnam ____________ _ Quitman ___________ _ Rabun______________ _ Randolph_________ _
Richmond _________ _ Rockdale ___________ _ Schley ______________ _ Screven_____________ _
Seminole ___________ _ Spalding___________ _ Stephens ___________ _ Stevvart ____________ _ Sumter ___________ _ Talbot _____________ _
Taliaferro __________ _ Tattnall ____________ _
Taylor ______________ _ Telfair ______________ _ TerrelL _____________ _ Thomas ____________ _ Tift _________________ _
Toombs _____________ _ Tovvns ______________ _ Treutlen____________ _ Troup ______________ _ Turner _____________ _ Tvviggs______________ _ Union ______________ _ Upson ______________ _
Walker_ _____________ _ Walton _____________ _ Ware_______________ _ Warren _____________ _
Washington ________ _ Wayne ______________ _ Webster ____________ _ Wheeler ____________ _
White _______________ _ Whitfield ___________ _ Wilcox ______________ _ Wilkes ______________ _
Wilkinson __________ _ Worth ______________ _
14,735.93 13,697.37 7,579.58 13,874.46
8,145.33 9,809.36 14,567.05
13,913.75 14,808.98 9,234 53 14,750.81
10,119.67 17,339.29 5,722.00
7,247.26 18,842.61
6,423.35 10,172.09 8,198.72 16,952.64 19,073.09
16,989.40 6,293.88
17,345.59 17,247.74 15,885.18 12,843.97
20,580.28 14,280.01
15,211.36 9,655.18 7,027.91
18,588.56 8,619.39 12,946.97 11,123.74
15,872.78 12,817.86
18,367.28 20,087.97 11,036.47
23,173.47 18,972.37 6,073.22
11,672.62 11,310.15
11,866.58
11' 156.49 14,949.30 14,870.12
16,088.62
$ 15,613.36 14,51?.96
8,030.86 14,700.58 11,233.89
10,393.43 15,345.41 14,735.37
15,690.76 9,784.38 15,629.13 10,722.26
18,371.75 7,042.03
7,687.39 19,964.57 6,803.22 12,974.28
8,686.90 17,962.06 20,208.78 18,001.03
7,889.77 20,956.24 18,518.13
18,831.14 14,707.94
24,307.84 15,190.30 16,051.35
10,230.11 7,446.37 20,992.23
9,131.04 14,508.59 11,786.09
16,841.09 15,096.40 19,460.93
21,686.30 12,413.31
24,553.30 20,139.65
7,353.96 13,949.87 14,185.49
12,674.86 11,820.80 15,839.43
18,018.60 17,107.65
$ 16,392.96
15,465.04 8,687.96 15,606.49 11,970.85 11,075.27
16,352.08 15,680.90 16,577.62
10,426.25 16,645.77 11,425.65
19,574.52 7,504.00 8,191.70
21,274.28
7,248.60 13,726.46 9,256.78
19,114.79 21,641.77 19,131.40
9, 751.08 22,553.80 20,248.79
22,836.50 15,767.50 25,928.83 16,252.83
18,868.55 10,901.32 7,934.88
22,859.82 9,728.32
15,708.53 12,565.82 17,945.89
16,072.76 20,817.43 23,108.95
13,224.45 25,906.64
21,466.93 10,694.99 16,606.06 15,111.21
13,542.46 12,596.24
16,975.62 20,007.24 18,251.61
TOTALS ___________ $2,201,"281.35--~ ~1,929.73- $2,"63(\856.72-
31
Pi\RT TWO
FISCAL YEAR ENDING JUNE 30, 1935
STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES
JUNE 30, 1935 ASSETS
Exhibit "A"
Current Assets Cash in Banks State Funds __ -----------National Recovery Trust Fund __ _
_____ $
294.3:H 15 3\18,888.51
(;93,219 66
State Tre.:'lsurer, Highway Fund~-_ L. S. Government, Vouchers in Tran,;it
Federal Aid ___________________ _
National Recovery _____ _
:l.\lll6 .05 3\17.804.11
6,0lHl,mHl.l2 401.770 22
Accounts Receivable________________ _ Advances __________________ ------ _______ _
100,'1:36.05 1.545.00
7 ,2G3 ,570.05
Deferred Charges Inventory of Supplies and Materials _______ _ Shop Jobs in Progress ____________________ _ Undi:3tributcd Payrolls ___________________ _
Undistributed Charges _______ ---------- __ _
122,139 41 14,886.15 48,321.32 27.883 15
213.830 03
Total Proprietary Assets _______________ _
$ 7,4i7,400.08
Capital Investments Land, Buildings and Equipment (Schedule Xo. 4) Land ____________________ ------------ __ $ Buildings _____________________________ _ Trucks _______________________________ _
Tractors----- ______ -- _________________ _ Other Road Equipment _________________ _
Engineering Equipment ________________ _ Office Equipment ______________________ _
Shop Equipment_---------------------Laboratory Equipment_ ________________ _ Quarry Equipment ________________ _
178,295.25 315,229.00 268,445.00 133,7GO.OO 321,139.00
36,421.00 39,513 70 47,599.00 14,953.00 52,753.00
$ 1,408,118.55
Roads and Bridges Construction Cost to Date On Closed Projects _________ --------- $132,346,516.54 On Open Projects--------------------- 11,408,182.49
W. & A. Rental Warrants ________________ _
143,754,099.03 1,620,000.00
Total Capital InYc,tments ______________________________________________ $146,782,817.58
TotaL_. ___________ ------------------ .... ------- ____ -..... $154,260,217.66
34
Exhibit "A." STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES
JUNE 30, 1935 LIABILITIES, FUND BALANCES AND SURPLUS
Current Liabilities Accounts Payable __________ --------U. S. Government, Advance National Recovery Fund---------------------------
Total Proprietary Liabilities ____ _
Fund Balances (Schedule No. 6) Construction Contract Liabilities Contracts, State ___ --------------Contracts, National Hecovery ___________ _ Contracts, Other FederaL __ - _____ _____ _
none 600,000.00
600,000.00
2,390,5Y8.65 3,8tn,o:Jo.23
43,644.66
Totals----------------------------Less: Participation Receivables
Federal Aid ____________ --------------
National Recovery-------------------_ Other Funds, Net ___________________ _
23 '653 09 3,520,347.71
20,11128
6,32.5,273 54 3,564,112.08
Net Liabilities, State Funds _________ _
Unencumbered Allotment Balances Construction, State Forces ______________ _
Survey Projects ___ ----------------- ___ _ Reconstruction Projects _____ ------- ____ _ Maintenance, GeneraL _______ ------- ___ _ Convict Farm _______ --- __ ---_------- __
$ 2,/Ul,HH 4G
729 '400. 99 56,303 2~ 10, i4i 75 46, 132.49 65.317 '73
907, U02. 23
Unliquidated Purchase Orders------------
158,858.15
Total Fund Balances.-----------
Capital Liabilities and Surplus Capital Liabilities Refunding Certificates-Due to Counties -1936 thru 1945 ____________________ _
Surplus Invested in Plant and Equipment __ _ Surplus Invested in Highways _____________ _ Surplus Invested in W. & A. Warrants_
$ 3,82792184
$ 26,574,773.34 1,408,118.55
117,179,925.69 1,620,000.00
Total Capital Liabilities and Surplus ________ _
$146,782,817.58
Current Fund Surplus-Exhibit "B" Available Surplus, State Funds_____________ Surplus Reserves For County Construction ContractsDetail Estimates Incomplete ___________ $
For Revolving Fund (Doubtful Assets and Deferred Charges)____________________
For Redemption of Refunding Certificates-March 1936___________________
61,243.96 336,422.09 1,331,864.10
$ 1,319,948.09 1,729,530.15
Total Available Surplus and Reserves _______ -------------------------___ $ 3,049,478. 24
TotaL------------------------ ____ -------------- __________ ------------ $154,260,217.66
Note-current surplus, as above, does not include un>llotted Federal Funds amounting to $2,751,781.21
35
STATE HIGHWAY BOARD OF GEORGIA
Exhibit "B"
RECONCILIATION OF FUND SURPLUS
REFLECTING FUND REVENUE, ALLOTMENTS AND RESERVES
JULY 1, 1934 TO JUNE 30, 1935 Fund Surplus, July 1, 1934
Available Surplus, State Funds----------------Surplus Reserves _____ ------------------------
953,360.90 379,042.60 $ 1,332,403.50
FUND REVENUE
Revenue Received (Schedule No. 7) Motor Vehicle_______________________________ $ 1,206,051.30
Gasoline Taxes ______________ -----------______ 9, 655,076.41
Miscellaneous Income _______ ----------------__
22,757.91
$10,883,885.62
Estimated Participation Accruals (Schedule No. 7)
Federal Aid Allotments_---------------------National Recovery Allotments ________________ _ National Forestry Allotment __________________ _
Other Construction Participation______________ _
151,114.48 5,729,78109
39,777.78 18,900.40
5. 939,573.75
Total Fund Revenue ____________________________________ ------------------ $ 16,823,459.37
Available for Allotments ___ ----------------------------------------------- $ 18,155,862.87
FUND-ALLOTMENTS
Continuing Allotments (Schedule No. 6) Construction Projects Contractors, State Aid ______________________ _ Counties, State Aid_________________________ _
Contractors, Nat'l Recovery __________________ _ Contractors, Other Federal_ _________________ _ State Forces & Materials____________________ _
1,359,113.04 1,852,735.77 6,381, 748.46
57,617.43 1,649,699.43 $ 11,300,914.13
Survey Projects _______________________________ - _____________ _ Reconstruction Projects ______________________________________ _ Maintenance General__~------------ ________________ ----------
257,833.11 21,652.52
1,167,190.71
Total Continuing Allotments._------------------
$ 12,747,590.47
Non-Continuing Allotments (Schedule No. 6) Administration ______________________________ _ Research ___________________________________ .
Collection of Revenue _______________________ _ Quarry--- __________________________________ _
Equipment _______________________________ ---
Shop, Net ___ ------------------------- ______ _ Legislative Transfers
Motor Vehicle Tags ________________________ $
Transfer to Gen'l Fund-1935 Act. _________ _
60,059.69 2,000,000.00
2,060,059.69
------~~~-
Total Non-Continuing Allotments _____ ------------------- __ $ 2,358, 794.16
241,774.41 298.39
39.020.14 1,187.10 16,343.68
110.75
Total Fund Allotments---------------------------------------------------- $ 15 ,10fi,384. 63
Fund Surplus, June 30, 1935-Exhibit "A" Available Surplus, State Funds _______________ _
1,319,948.09
Surplus Reserves for:
County Contracts, Detail Estimates Incomplete Doubtful Assets and Deferred Charges _______ _
61,243.96 336,422.09
Redemption Refunding Certifieates-1936____ _
1,331,864.10 $ 3,049,478.24
36
THE HIGHWAY DOLLAR
r~rq/rvn~ ..;16.,7.5%
c;;;,..-/.-;,.C" 70~ .56.32'%
INCOME
L'<Tnc:/ CJo/M/?p.s ~ .C~v-;PA?~n/./Z%
.Ad,-n;n/$7"'r<T hen /.~.5/t
Co.os/rvc?"'/on 76-M')t
EXPENDITURES JULY I 1934 TO JUNE30 1935
STATE HIGHWAY BOARD OF GEORGIA
Exhibit "C"
STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES
JULY 1, 1934 TO JUNE 30, 1935
Revenue Receipts
State Treasurer Motor Yehiclc License Tax _______________ _ Fuel Oil Tax_ _________________ _
U. S, Government Reimbursements for Construction
Railroads, Counties and Cities Cash for Construction _________ _
Miscellaneous Income ____________ _
$ 1,206,051.30 0,655,076.41 $10,861,127.71
6,232,390.34
28,446.52 22,757.91
Total Revenue Hcceipts ___ _
$17' 144 '722 .48
Administration (Schedule No. 8-A) General Administration General Office ____________ _
Division Offices \V~archouse ____ _
EXPENDITURES
----- $
197,599.85 28,760.34 13,348.89
Research' ___________________ _ Collection of Revenue __________ _ QuarrY--------------------------------
239' 709.08
175.39 39,020.14
I, 157.10
280,061.71
Construction (Schedule No. 8-B) Surveys Actual Surveys ___________________ _
Plans __________________ -----------
!51 ,592. !l6 88,338.32
230,930.98
Construction
Supervision ____ ------------Actual Construction __________ _
444,001.33 10,936,059.00 $11,380,060.33 $11,619,991.31
Maintenance (Schedule No. 8-C) General
Supervision.-------------Actual Maintenance _________ _
62 '910. 83 1,098,943.18 $ 1,161,854.01
Reconstruction Supervision ________________________ _
Actual Reconstruction ___ ------- ___________ _
16.72 14,202.49
14,219.21 $ 1,176,073.22
Land, Buildings & Equipment (Schedule No. 8-D) Administration Equipment_ Construction Equipment_ Maintenance Land ______ _
Equipment_
150.00 1,964.27
2,280.12 14,300.62
2,114.27
18,695.01
38
STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES
JULY 1, 1934 TO JUNE 30, 1935 EXPENDITURES-Cont'd.
Exhibit ''C" Cont'd.
Legislative Transfers (Schedule No. 8-E) Motor Vehicle License Tags ______________ _
Transfer to General Fund-1935 Act ______ _ Prison Farm Purchase ________________________ _
Total Expenditures _________________________ _
60,059.69 2,000,000.00
546.93 -------------------
$ 2,060,606.62 $15' 155,427.87
Excess Revenue Receipts over Expenditures ________ _
Add Excess Proprietary Assets over Liabilities July 1, 1934_ ____________________________________ _
Excess Proprietary Assets over Liabilities June 30, 1935-Exhibit "A"-------------------------
$ 1, 989' 294.61
$ 4,888,105.47 $ 6,877,400.08
RECONCILIATION
Excess Proprietary Assets over Liabilities (as above). Available for Liquidation of Fund Balances and Surplus Reserve.:; _________________ _
Fund Balances (Contracts-Allotments-Purchase Orders, Etc.) ________________________ _
Current Fund Surplus ____________________ _ Surplus Reserves (Refunding Certificates, Doubt-
ful Assets, Deferred Charges, tTnrecorded Contracts) ___________________________________ _ Available Surplus, State Funds, June 30, 1935Exhibit "A"-------------------------------
$ 6,877,400.08 3,827,921.84
$ 3,049,478.24
$ 1'729 '530. 15 $ 1,319,948.09
39
STATE HIGHWAY BOARD OF GEORGIA LAND, BUILDINGS AND EQUIPMENT June 30,1935.
Schedule No.4.
Description
Appraised Value
July 1,1934
Additions for Fiscal Year
1934-35
Total June 30,1935
Depreciation for Fiscal Yr.
1934-35
Appraised Value
June 30,1935
Land ______________________ ---Buildings _____________________ _
Automobiles __________________ _ Trucks _______________________ _
Tractors ______________________ _ ..,.. Other Road Equipt. __________ _
.... Engineering Equipt. __________ _ Office Equipt. ________________ _ Shop Equipment_ ___________ _
Laboratory Equipment_______ _ Quarry Equipment ___________ _
$ 178,145.25 315,229.00
327,640.00 163,775.00 364,432.00 38,153.00 41,575.00 53,183.00 16,500.00 58,293.00
$
150.00
------------------
5,066.80
--- - -------------
9,070.03 2,040.12 1,775.77
592.29
---- ------------------------------
$ 178,295.25 315,229.00
332,706.80 163,775.00 373,502.03 40,193.12 43,350.77 53,775.29 16,500.00 58,293.00
-- ---------------------------------
$ 64,261.80 30,015.00 52,362.43 3,772.12 3,837.07 6,176.29 1,547.00 5,530.00
$ 178,295.25 315,229.00
268,445.00 133,760.00 321,139.60 36,421.00 39,513.70 47,599.00 14,953.00 52,763.00
TOTALS __________________ _
I"A"_________ .. __ __... _____ ___ ______ ____ _ $1,556,925.25
$ 18,695.01- I[--$1-,575,62_0_.2B_II $ 167,501.71--.
Total Appraised Value,June 30, 1935-Exhibit
=$=1=,4=0=8,=1=18=,=5=5=
Schedule No.5 STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1935
County
:1
. Amount II
County
I
I Amount
Elbert~~~-$- Appling ___- -__- __ :-$- 243,720=-t
166,551.32
Atkinson___ Bacon____
Baker________
Baldwin___
Banks ________ 1
Barrow_____
1
Bartow____ __-I
BenHilL ___ --1
Bibb__
-1
Bleck1ey____
Brantley____
Brooks_______
Bryan__________
Bulloch________
Burke__________
Butts_______ __
Calhoun_______
Camden____
Campbell______ _
Candler_______
Carroll______
Catoosa_________
Charlton___ ____
Chatham____
Chattahoochee__
Chattooga___
Cherokee____
Clarke
Clay___
Clayton___
Clinch__
Cobb
Coffee
Colquitt___
Columbia___
Cook_______
Coweta______
Crawford______
Crisp______
Dade______
Dawson____
Decatur____
DeKalb _____
Dodge_________
Dooly______
Dougherty__
Douglas
Early_______
Effingham__
12,314.60 EmanueL--------1. 26,272.90 Evans___________
24,969.42 11 Fannin __________ l 99,927.56 ' Fayette__________
75,191.59 Floyd_____
71,720.80 Forsyth__
124,299 .E4 Franklin_
61,400.58 Fulton____
835,846.57 Gilmer___
26,606.23 Glynn ______ ,
36,034.96 Gordon.___ __
359,320.51 Grady___
1
30,623.58 Greene____
123,758.98 Gwinnett___
243,630.66 Habersham___
82,818.10 HalL_________
9,977.75 Hancock_______
13,152.00 Haralson______
205,893.32 Harris_ ____ __
30,835.42 Hart_
523,814.89 Heard_____
23,142.85 Henry__________
81,348.22 Houston___
1,310,079.46 Irwin____________
17,875.97 Jackson________
124,788.11 Jasper________
199,509.72 Jeff Davis__
372,977.13 Jefferson____
47,141.09 Jenkins____
49,202.42 Johnson_________
62,153.55 Jones______
278,612.80 Lamar_______
75,961.09 Laurens_________
150,890.06 Lee______________
61,865.28 Liberty____
209,732.93 Lincoln______
487,277.97 Long________
31,709.18 Lowndes____
91,539.61 Lumpkin____
74,869.42 Macon______
25,713.39 Madison__
371,629.87 . Marion ________ .
259,849.79 McDuffie_________
64,102.49 Mcintosh_
192,022.91 Meriwether___
493,915.22 Miller___________
44,494.34 Milton___________
77,836.12 Mitchell________
57,391.06 Monroe__________
493,986.86 72,135.44
187,014.95 46,859.63 430,838.77 65,191.97 108,765.48 113,926.08 56,130.62 420,745.28 91,044.59 111,967.53 61,662.97 206,029.29 341,736.71 400,391.36 75,923.E5 149,659.86 106,678.62 125,506.39 19,131.75 219,591.56
291,391.43 56,545.31
127,589.35 91,658.61 33,398.63 350,905.53 85,086.68 35,649.49 42,877.44 19,499.10 284,243.00 81,509.77
31,332.06 32,830.45 38,174.64 547,277.10 84,092.05 193,593.06 20,359.40 22,817.86 53,649.81 15,277.50 405,913.92 35,395.83 20,713.10 417,193.11 119,384.92
42
Schedule No.6-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1936
-
- - - - - - - - - County
Amount
County
I Amount
-----~--~-~-
:Montgomery _____ $ :Morgan__________ :Murray__________ :Muscogee _______ Newton__________ oconee _____ - __ --
Qgletl:_J.Orpe_-- -- -~ Pauldmg_________ Peach______ -- __ -Pickens _____ --___ Pierce____________ Pike ______ --- ___ Polk ________ -____ PulaskL_________ Putnam ________ Rabun___________
Randolph________ Richmond_______ Rockdale________ Schley___________ Screven__________ Seminole_________
Spalding_________ Stephens________ Stewart__________ Sumter__________
Talbot___________ Taliaferro_______ Tattnall_________ Taylor________ ___
124,580.70 259,212.39 89,811.16 827,817.07
95,468.70 26,106.42
39,279.24 19,157.24 8, 194. 69 120,956.51 169,875.66 12,808.02 183,409.70 242,410.52 103,271.71 318,631.00
82,788.81 1,139,823.99
2,091.95 55,521.49 40,751.20 25,742.03
377,686.16 133,031.70 47,475.00 365,369.72
74,343.95 15,691.86 43,422.07 26,056.54
Telfair_ __________ $ TerrelL _________ _ Thomas _________ _ Tift _____________ _ Toombs________ _ Towns __________ _
Treutlen________ _ Troup __________ _ Turner _________ _ Twiggs __________ _ Union ___________ _ Upson __________ _ Walker_ _________ _ Walton _________ _ Ware____________ _ Warren _________ _
Washington ____ _ Wayne __________ _ Webster ________ _ Wheeler _________ _ White ___________ _ Whitfield _______ _
Wilcox __________ _ Wilkes __________ _ Wilkinson _______ _ Worth __________ _
Coastal Highway
74,387.83 271,526.03 391,611.67 177,857.97 205,582.07
45,084.25 2,000.00 631,255.57 24,384.28 22,555.36 50,680.00 121,586.46 187,076.07 161,859.52 634,572.73 22,603.85 106,474.51 272,659.54 13,740.18 133,062.67 35,472.82 265,529.38 10,093.64 268,753.94 36,060.67 245,023.78 882,898.87
TotaL ______ $ 26,574,773.34
43
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ALLOTMENTS AND FUND BALANCES; ALSO
REFLECTING RECONCILIATION WITH EXPENDITURES JULY 1,1934 TO JUNE 30, 1935
Schedule No. 6
Net
Estimated
Net
Estimated
Net
Description
IFund Balances Participation Fund Balances Allotments July 1. 1934 July 1, 1934 July 1, 1934
En cum.. brances
Expenditures
Total Charges
Fund Balances Participation Fund Balances June 30, 1935 June 30, 1935 June 30,1935
--------- ------------------ ----j-----1------- -------------- ----------------- --
Continuing Allotments~
Construction:
Contracts, State
Aid ___________ $2,282,135.01
Contracts, Nat'!. I
29,657.40 $2,311,792.41 $~.211,848.81
14.68 $3,133,027.89 $3,133,042 ..17 $2,390,598.65
20,111.28 $2,370,487.37
Recovery______ 418,287.76 3,821,818.99 4,240,106.75 6,381,748.46 6,622.61Cr 6, i:l/,447.59 6, 730,824.98 :l,8\l1,030.23 :J,520,:l47.71 370,682.52
Contracts, Federal
Aid..
733.13Dr. :33,898.80
33,165.67
57,617.43
47,138.44
47,138.44
43,644.66
23,65:3.09
19,991.57
Total Construc-
tion Contracts $2,699,689.64 $:3,885,375.19 $6,585,064.83 $9,651,214.70 $ fi,fi07.93Cr. $9,917,613.92 $9,911,00,1.99 $6,325.273.54 $3,564,112.08 $2,761,161.46
Stat~:' Forces a n d - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Materials ...... $ 567,280.06
. $ 567,280.06 $1,649,699.43 $ 25,132.09 $1,462,446.41 $1,487,578 ..\0 $ 729,400.99 _____________ $ 729,400.99
Total Construction ___________ $3,266,:969.70 $3,885,375.19 $7,152,344.89 w,:l00,914.13 $ 18,524.16 $11,:380,060.33 $11,398,584.49 $7,054.674.53 $3,564,112.08 $ 3,490,562.45
Surveys _________ $ 38,727.61
_ $ 38,727.61 S 257,833.11
:126.47 $ 239,930.98 !$ 240,257.45
56. 30:l. 27
--- $ 56,30:l.27
Reconstruction...
6,863.27
. .
6,863.27
21,652.52 3,548.8:3
14,219.21 . 17,768.04
10,747.75
10,747.75
Maintenance
I
(Sch.l-io.6-A)_ 18,311.68 .........
18,311.68 1,167,190.71 22,484.11Cr. 1,161,854.01 1,1:l9,:J6\l.90
46,132.49 ___________
46,132.49
I I Convict Farm... ___(),1'_86:.:_"6 .____::..:..::..::. -~~~64. 66_ _ _ _-~~~ ~~----- --~ ~3_ ___ 546_:113_ ______6ii-_:31'7.-':3_ ::..:..::..::.~~~- _ __li5_,:J.l'7,i'3 _
Total Continu-
I
I
ingAIIotments . .
= $:l= ,39=6,= 736-.= 92=1$i3=,8= 8.1-,3=75=.19=
$7,282,112.11 ,$12,747,5\10.47
======= =======
$ 84.{i5Cr.
=======
$12,79li,611.46
=======
$12,7\)6,526.81 $7,2:l:l,175.77
=====,====-------=-=
$:l,5fi4,112.08 ======
$:l,6fi9,06:l.fi9 --:-:::;=:=====
Description Non-,JW~~e~;.g
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ALLOTMENTS AND FUND BALANCES; ALSO REFLECTING RECONCILIATION WITH EXPENDITURES JULY 1,1934 TO JUNE 30,1935
, Net-
Estimated
I!-Fund Balances Participation , Fund Balances I July 1, 1934 . July 1,1934 1 July 1,1934 I
-~- ----!~-----~---- ---~
II Expenditures
- ~-----
Total Charges
' ------~--
Estimated
Net-
Participation ' Fund Balances
1
June30, 1935, June30,1935
Administration
,
(Sch.:So.6-H) ____ :_ ------------
'
RCo/s~e~air~c:h~l:\:}~;~~~~'- __:
Quarry
!
(Sch.No.6-ll) ___ _]_______
Equipm'nt.
:
(~ch.:So.6-C)____
---1
~~~f~:}:l:~~~~~_r:~-:r _______ ::::~-----
241.774.41 $2,065.33
:39.:~::~: I1--:::~-0~----
1.187.10 I 30.00
16,34:l.68 2,351.33C'r.
60.:::::: 1110.75 --
:JU,020.
241,774.41
:HI.~~~:::
I, 187.10
16.343.68
60 :~:: ::
I:--.:-:~-~::~II::~~~~~-~~:-
-
TrF~~d'_1~~5 ~~~\------ :____ ______
2.000,0~0 00 ~----- _______ 2~0~,0~-~~~::-~:-:_:~::[:..~-:._:J:~~
tT~~i~~g a~:~~~~~~~~+-~:.::.:_:_--_-_-_--~-':_::..:::..:::..::::.::.::.:_:_:'=--=-===- _: 1~,:3~ i94:~!l_ 22~::.C~-~~~58,8J(j 4~~2~~~'i!J~'!~~ ::~~-- --~:-;,:_--.~:_:_ :.:ci.:..:_------:-----
1\et Fund Balanccs, - -- --_---- -~- . --- ---- - -~
1
July 1, 1934. ______ 1$3,396,136~~1
;
Estimated Participation,Ju1~\l:i4.:-l$3 ,885,375.19 I
Fund Balances,July I, 1U:34. ___ .. ____ ... ______ .. ______ !$7. 282, 112.11
I
Allotments for year-Exhibit "B" -------------
= - = = $15,10f>,384 63
~-~--~
I
EncumhranN'A for Year-Net Encumbrances_.
- -----r=~IJ6~0Cr.=;
I
Expenditun' for Year~ Exhibit "C" ____ _ Total Charges for Year ____________ _
-----_-___-_-__-_-_-_-_ ____'~~~~~~?-8~:~~~>;?!~LI I
Fund Balances, June 30, 1935 ______ .. F.atimated Participation, June 30, 1935 .. __ _
________________
__________ ____
_ _______ $7,233,175 77 I
_ ----1-~~:=~~----:~._s~~._r~ osl
Net Fund Balances, June 30, 1935... __ __ Add
Unliquidated Purchase Orders, etc __ _
Total Fund Balances, State Liability, June 30, 1935-Exhibit. "A" ____ __
------------------- -------
----------------1~-~58,858~_5__ -------------- ------------------- .$3,669,063.69 ----
. -----------------
-----------.---------- $3,827' 921.84
I=====
----
STATE HIGHWAY BOARD OF GEORGIA DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY
UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1935
Schedule No.6-A
Districts
!unencumbered Allotments
July 1, 1934
I
Allotments
Net
Expenditures
Encumbrances
SUMMARIZED BY DIVISION UNITS DIVISION NO. 1.
Unencumbered Total Charges Allotments
June 30, 1935
1-L ______________________ I$
:5; 1-2
1-3:::::::::::::::::::::::
1-11______________________ 1-12_ _____________________
1,857.75
1$
3,476.64
1 ,020. 720.R.
1,711.27
442 .900.R.
40,973.62
98,454.33 66,430.13 148,512.01 34,916.35
1$ 574.41or. $ 44,145.8o
620.120r.
95,754.19
596 .54Cr.
65,808.75
529.15
145.606.24
1,558.37
32,880.35
$ 43,571.39
95,134.07 65,212.21 146,135.39 34,438.72
i$ 740.o2o.R.
6,796.90
I 197.20
1 4,087.89 34.73
Totals _______________ $5~2M~ $389,286.4-4-~-$-296.45--$384,195.33~_.'li 3~,491.7S$10~!7Q~
DIVISION NO. 2.
-~- - - - - - - - - - - - - c - - - - - - - - - , - - - - - - - c - - - - - - - - - , - - - - - - - - - - - - - c - - - - - -
2-L ________ .. _______ _
1$ 2,924.96
$ 50,601.46
22--43___-_-_-_-_-_---------
2,037.83 847.93
29,041.24 63,930.98
2-6. ---------------------- 1,186.21
75,184.52
2-8 --------- ------ -----
243.10
7,310.78
2-10 __________ ----------- 2,609.130.R. 2-12 _____________________ _ 2,478.36
82,347.16 101,385.21
!$ 707.8101'. 1$ 51,828.26
874.29
25,323.29
948.40
60,060.17
439.33
72,098.10
5.21
7,443.97
3,083.880r.
82,379.59
10,749.670r. 114,046.17
$1 51,120.45
26,197.58
61,008.57
72,537.43 7,449.18
79,295.71 103,296.50
$ 1
2,405.97 4,881.49 3,770.34 3,833.30
104.70 442.32 ' 567.07
Totals
J$ ------$ 7,109.26
$ -~9,801.35
1~,274._l_30r.- $ - 4_l_~l'7~,;5!5_ __ $~__!100,9Q5.42 -~$ l~Q05_~=-~
STATE HIGHWAY BOARD OF GEORGIA
ScheduleNo.6-A-Contd.
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY
UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1935
Districts
IUMl~~:e~~~ed I Allotments I
Net
Expenditures ITotal Charges ~U~lf:~~~~ed
1
_ _ _ _ _ _ _ _ _ _ _ _Jul_.y'------'1,'-1_9_3_4__c___ _ _ _ __.,_E_n_c_u_m_b_rances
June 30,1935
DIVISION NO. 3.
3-4 _______ _ 3-5 ______ _ 3-6 _______ _
3-7--- .. 3-8_------- . 3-9 ________ _ 3-10 _______ _
____ $ 463.91
,$ 8,142.02 $
81:s6cr.'$ 8,335.65 $ 8,253.79 -$-.--3~u-
1,320.49
18,371.99
567.44Cr.l 19,856.93
19,289.49
402.99
1,467.55
12,684.65
107.44
12,271.15
12,378.59
1,773.61
619.330.R.
95,472.45
3,53l.84Cr.l 91,477.20
87,945.36
6,907.76
2,707.59
95,643.09
514.86Cr.l 96,442.36
95,927.50
2,423.18
324.9lO.R. 129,275.72
5,896.06Cr.l 127,793.23
121,897.17
7,053.64
605.08
8,513.00
2l.81Cr.
8,302.61
8,280.80 I
837.28
Totals_
$ __ 5,620.38= $ 368,102.92 -$-10,506.43cr.!$ 364,479.13 _I$ ~53,972.70 1$ 19,75o.6o
Totals_
_1$ 18,311.68
$1,167,190.71 I$ 22,484.11Cr.1$1,161,P54.0l
----- --S-UiVfiVIARIZED-BYCONG-RESSIONAL DISTIHCTS
1_ _ _ _ _ _ ----::!$ 4,782 71
$- 91,575.08 $ 1,262.22Cr. $ 95,974.C6
:$1,139,369.90 $ 46,132.49 . ---
$ 94-,6-9-1-.8-4_$_ -1-,-66-5-.95--
2 __ ._ ______
I
3 _________
1
4 --- ----------- ------I
5__
6
7__
. _________
8
9______
10_________
ll_________
12________ ___
3,476.64
1,017.11
1, 311. 84 1,320.49 2,653.76
619.330.R.
2,950.69 324.910.R.
2,004.050.R. 1,711.27 2,035.46
98,454.33
95,471.37
72.073.00 18,371.99 87,869.17 95,472.45
102,953.87 129,275.72 90,860.16 148,512.01 136,301.56
620.12Cr. 95,754.19
95,134.07
277.75
91,132.04
91,409.79
866.54
68. 395.82
69.262. 36
567.44Cr.: 19,856.93
19,289.49
546.77
84,369.25
84,916.02
3,53l.84Cr. 91,477.20
87,945.36
509.65Cr. 103,886.33
103,376.68
5,896.06Cr. 127,793.23
121,897.17
3,105.69Cr. 529.15
9,19l.30Cr.
90,682.20 1 87,576.51
145,606.24 I 146,135.39
146,926.52
137,735.22 I
6,796.90
5,078.69
4,122 .48 402.99
5,606.91 6,907.76
2,527.88 7,053.64 1,279.60 4,087.89
601.80
Totals_____
__ $18~31i-:68-- $1,167,190.71 $--22,484.11Ch.l$1,161:854.01-i$1,139,369.9o- $-46, !.49~-
Schedule No.6-B
STATE HIGHWAY BOARD OF GEORGIA
DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30 ' 1935
'
Unencumbered
Unencumbered
Allotments Allotments
Net
Expenditures Total Charges Allotments
July 1, 1934
Encumbrances
June 30, 1936
GENERAL ADMINISTRATION ALLOTMENTS GENERAL OFFICE
I
GM.tOnc. .-O--l-a-i-m--s-_-_-_-_-_-_-_--_-_-_-_-__-_-_-_-_-_-_-_-_-_-_-_-_-_-_--_ '$
188,756.45 4,737.77
Const .Claims___________________________ _
~ Other Claims _________ ---1- ______________ _
5,461.31 672.40
J ______________ Totals ______________
1_$_1_9_9,6_2_7.9_3_
I $ 2,028.08 $
----------------------------------------------
186,728.37
4,737.77 5,461.31
672.40
$ 2,028.08 $ 197,599.85
+______________ Warehouse _____________
WAREHOUSE
-I$ 13,295.93
13,348.89
DIVISIONS
I
Div. No. L _______________________________ $ 9,185.50 $
2________________ ----------------
8,959.82
3_--------------- ----------------
10,705.23
77.17 $ 9,108.33
14.94
8,944.88
1.90Cr. 10,707.13
Totals _______________________________ $ 28,850.55 $
90.21
28,760.34
1: T
otals
-------1
_______________________________ $
------
241,774.41
-I1 $
-----
2,065.33
-
239,709.08
$ 188,756.45 4,737.77 5,461.31 672.40
$ 199,627.93
----------------
----------------
-------------------------------
----------------
13,295.93
1----------------
$
9,185.50 8,959.82
----------------
----------------
10,705.23 ----------------
1--$--28,850.5--5--)---------------1$ 241,774.41 --- ------------
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 6-B-Cont'd.
DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30, 1936
Unencumbered
Unencumbered
Allotments Allotments
Net
Expenditures Total Charges Allotments
July 1, 1934
Encumbrances
June 30, 1936
OTHER ADMINISTRATION ALLOTMENTS RESEARCH & ANALYSIS
~ Analysis ______ - _______ --- __ --- __ --- _____ - $ Research _______________ - ----- ____ -- --- --
Totals _______________________________ $
116.84 $ 181.55
298.39 $
116. 84 6.16
123.00
-- --- --- ---- --- - $
$
175.39
$
175.39 $
116.84 181.55
298.39
COLLECTION OF REVENUE
Totals ______________ -1- _______________ ,$ 39,020.14 1--------------- -I$ 39,020.14 1$ 39,020.14 1----------------
-I$ Totals _______________ ,_______________
QUARRY
1$ 1,187.10
30.00 1$
1$ 1,157.10
1,187.10 /----------------
STATE HIGHWAY BOARD OF GEORGIA DETAIL OF EQUIPMENT UNENCUMBERED ALLOTMENTS
JUNE 30, 1935
Schedule No.6-C
Unencumbered
Unencumbered
Allotments Allotments
Net
Expenditures Total Charges Allotments
July 1, 1934
Encumbrances
June 30, 1935
Mtn;~~~;:~ ~ ~ ~- ~ _~~~~~::I~~~~~~~~~~~:~:~~ l-$-----~-- Admins. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Constr. _____
g
_
I ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~~ ~ _ $
1
1,796.37 12,433.04
2' 114.27
1$
I~~~~
483.75Cr.$ 1, 867. 58Cr.
-----------
2,280.12 14,300.62
2,114.27
$
--~~--
1
I 16,343.68 1$ 2,351.33Cr. $ 18,695.01 1$
1,796.37 12,433.04 2,114.27
16,343.68
-------- ~ -----
---------- -----
-------- -------
--~-
I~~~~~~~~ -------
STATE HIGHWAY BOARD OF GEORGIA MAINTENANCE APPROPRIATION JUNE 30, 1935.
Schedule No 6-D
Appropriation For Fiscal Year 1934-35-Based upon $10.00 per Mile _______________ -------------------
Special Appropriations-Bridge Repairs,etc
~1.083 ,57o.o5 103,144.57
Total.hailable --------------------
Deduct Unallottcd Appropriation Balance at June :30, 1935-Closed into Surplus _________ _
$1.186.720.62 12,567.12
Net Available ____ _
DEDUCT: Allotments for Year Maintenance General Division No.!__ Division No.2 ________ _ Division No.3 __
$1.174.153.50
----------------- $ 389.2811.44 409.801.35 3138,102.92
$1.167,190.71
Maintenance Administration
Compensation Claims _____________ _
Maintenance Equipment _________ _
Shop_________
___________________ $
Less: Shop Billings_____________________
234,044.24 233,933.49
4,i3i.ii 2,114.27
110.75
Total Allotments __ Appropriation Balance, June 30, 1935 _____ _
$1,174.153.50 0.00
51
STATE HIGHWAY BOARD OF GEORGIA ADMINISTRATION APPROPRIATION JUNE 30, 1935.
Schedule No. 6-E
Appropriation For Fiscal Year 1934-35................ . Deduct l"nallotted Appropriation Balance at June 30, 1935-Closed into Surplus ..
~et Available __________________ _
DEDUCT: Allotments tor Year General Administration Division No. L---------------------Division No.2 ... -------------------Division No.3 ..... ------------------
$500, 000 .00
222,457.73 $277,542. 27
$ 9,185.50 8,959.82 10,705.23
Total Divisions______________________________ General Office __________ ... ________ ... $278,021,79 Less: Blue Print Billings............... 89,205.34
$ 28,850.55 188,750.45
Compensation Claims ________________ _ "rarrhousc__________________________ _
6,133. 71 13,295.93 $237,036.64
Other Administration Allotments Research and Analysis _______________ _ Less: Test Billings___________________ _
Collrction of Revenue________________ _ Quarry _____________________________ _
$ 27,197,82 26,899.43
298.39
39,020.14 1,187.10
Total Allotments......... -----------------
$ 277,542.27
Appropriation Balance, June 30, 1935--------------------------------
0.00
52
BTATB HIGHWAY BOARD OP G'BOB.G'lA
Bchedu\e'No.,
SUMMARY OF ESTIMATED PARTICIPATION; ALSO B.EJ'LECTING B.ECONCILIATION
WITH REVENUE RECEIPTS
I JULY 1, 1934 TO JUNE 30, 1936
Estimated
Fund Revenue Revenue Receipts \
Estimated
Participation
Accrued
Participation
State Treasurer
July 1,1934
I
June 30,1935
Motor Vehicle ___________________________ --------------------$ 1,206,051.30
Gasoline Tax ____________________________ -------------------- 9,655,076.41
$ 1,206,051.30 9,655,076.41
---------------------------------------
Total State Funds _____________________ -------------------- $ 10,861,127.71 $ 10,861,127.71 --------------------
u .S. Government
National Recovery Projects _____________ $ 3,821,818.99
Other Federal Projects__________________
33,898.80
$ 5,885,632.19 35,041.16
$ 6,187' 103.47 45,286.87
$ 3,520,347.71 23,653.09
Total Federal Funds_-----------------$ 3,855,717.79 $ 5,920,673.35 $ 6,232,390.34 $ 3,544,000.80
ther Construction Funds Counties-Cash for Construction-pri-
or to Refund Act______________________ $ Railroads, Counties and Cities-Cash
for Construction______________________ Railroads, Counties and Cities-Con-
tract for Construction ________________
Total Other Funds __________________ $
12,215.50Cr. -------------------- --------------------$
41,530.13 $
18,900.40 $
28,446.52
342.77 -------------------- --------------------
29,657.40 $
18,900.40 $
28,446.52 $
12,215.50Cr. 31,984.01
342.77 20,111.28
M iscellaneous Income _____________________ --------------------$ Estimated Participation,7-l-34_ ________ $ 3,885,375.19
22,757.91 $
22,757.91 --------------------
Fund Revenue Accrued _________________
$ 16,823,459.37
Revenue Receipts ___ ___________________
$ 17,144,722.48
Estimated Participation, June 30,1935--Exhibit "A" ___________________________
$ 3,564,112.08
Schedule No. 8.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF EXPENDITURES BY OBJECT CLASSIFICATION
OBJECT OF EXPENDITURE
JULY 1, 1934 TO JUNE 30, 1935
I I I I(S::.a~:.i:E) I [ Analysis
Analysis
Analysis
Analysis
Total
I (Sch. No. 8-A) (Sch. No. 8-B) (Sch. No. 8-C) (Sch. No. 8-D) Legislative
Net
---~~---
--
1------ ~-Ml EMOR~Il_U_M~------
Net
Inter-Depart-[ Gross
~--~~--
Administration Construction Maintenance Equipment
Transfers Expenditures Expenditures .mental Billings Expenditures
Personal Services_________ ------------~$ Equipment Expenses __________________ )
Equipment Purchases_________________ Communication Services _____________ ] Heat,Light,Powerand Water__
176,843 33)$ 2,281 391
__ _______ 15,719.69
1
3,592.33)
692,177 .lfJ1$ 607,017 .22~-------------+-------------1$ 1,476,037. 71 $ 1,476,037. 71:$ 159, 118.10'$ 1, 635,155.81
304,722.70
417,348 4.) ______________ ______________
___________ -------------- $ 18,695.01 1--------------
3,064.97
7,170 371]-------------- --------------
724,352.54 18,695.01 25,55 03
724,352.54
8,560.52
18,695.01 --------------
25,955.03
984.08
732,9J:l.06 18,695.01 26,939.11
3,0ti6.70
976.96,______________ _
7,635.99
7,635.99
2,603.78
10,239.77
Rent-------------------------------
3,599.001 ti4,524.80
4,204.86-------------- __
72,328.1l6
72,328.6ti
50.00
72,378.66
Tmveling Expenses___________________
39,945.33
76,689 67)
21,579.01 _______
138,214.01 138,21401
4,394.93 142,608.94
Supplies and Materials________________
5,134.40 783,179 59 104,21\1.96 ______
__ 1_
892,575.95 892,575.95 172,013.27 1,064.589.22
1 1 1 11 1 ~ IPnr_suntrlanrgic,eB__.n-d-.-n-g-,- ;u-b--_-c ~t-l~.-e-t_c_______--_-__-_1
3,566.77 5,833.8611
3,323.47 274.06
13,284.43-----45.31______
~;:;:~:~;:;~~~;~;:~i~~;:~~~~~;~~.:-~~::ri,,_$-=-~~:~~:~~-~:~~F~~-~~1Ii- ~ " ~
1'""":"""~: ~;~:~iJ :li]Ui=~ ""~ :~:J;E 1
---1-
20,174.67 6,1.13 23
20,174.67 6,153.23
372.30 5.35
20,546.97 6,158.58
Total Administration-Exhibit "C" ___
1
280,061 71
~===-=
I
Total Construction-Exhibit "C" __________________ $11,619,991 31
1 1
Total Maintenance-Exhibit "C"--------------
------------ s 1,17ti,073
Total Equipment-Exhibit "0"-------------, Total Legislative Transfers-Exhibit "C" ___________________ _
__ '_~::_~:~:- 18,695 011
,.c= -----
I
----------- -------------!$ 2,060,606 li2)
Total Expenditures-Exhibit ''C" -------------------
--------------- ---- -- -=~:~-~~-/~::~5~~7
$15,155,427.87$ 350,098.26$15,505,526.13
ST,.TE HIGHW"'Y BO,.RD OF GEORGI"' "'NALYSIS OF ADMINISTRATION EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 8-"'
GENERAL ADMINISTRATION
RESEARCH AND ANALYSIS
OBJECT OF EXPENDITURE '~~--G- ene- ral-~ l~:~epart- 1,-Net Genera~ -~~a~~ and~- lnter-De;rt]---;,;;---
______ AdministratiOn Imental B1llmgs Administration __Analy~ 111!l:l!lf~"'_!JS_ ~sear_ct'__
1
Collection of
Quarry
Revenlle_ _
Total Net
Expenditures
Pers?nal Services________________ __ , $ 232,978 86 $ 77,388.57 $ 155,590.29 $
EqutpmentExpenses___________ __ Communication Services_______________ ,1
2,092.39 1 ___________ 15,5:34.34 1
2,092.39 15,5:34 34
Heat, Light, Power and Water_ ________ '
3,592.3:31
3,592.33
Rents_______________________
g: Traveling Expenses__________________ Supplies and Materials ____________ --~
3,599.00 21,304.78 16,979 17
11,876.77
3,599 00 21,304.78 5,102.40
~~:~;i::~eBl~dl~~:~;~bl~~i-t~:-~t-c~~:- --:1 ~:~~~ ~~ ---:- __: _ : ~:~~~ ~~ __
Indemnities ______ ---------
---~
21,ii12 14
21,612.14
Special and Miscellaneous Expenses----
1,880 78
1,880.78
18,225 67 $ 18,225 67!__
1,111 28
935 891 $
8.39
8 39 ___
G03.34
903.34
2,743.98 -----2:74;]-ggI::::::
2,096.88
2,096.88!------
27 00
27 00
___ __,:_-_
175 39
___
:__:_-_~ ___
20,209 54 184.95
1,04:3.50 13 61 .40
18,593 65~---
46.90
oo :J2
___
-_- ------~1--_:_:_:_:: _-_ __ : _-_-_-_:__-
1,958.28
1,958 28i-
_
_
_
52 69
176,843.33 2,281.39 15,719 69 3,592.33 3,599.00
39,945.:33
5,134.40
~:~~~ ~~
21,612.14 1,933 47
Totals_________________________ l~8,974.42---;265 34 239,709.08
27,074.82 ~~,;;, ;- --1;;;-;;,--;---;;-,02~ 14 ;-1,157 101_ _ __
===!====== =====.,========:r==
, - - - - I ----~1 -----
Total Administration Expenditures-Exhibit "C" ------ __ ___________ __ -----------~---------- ---,--------------~--------------~,-------------- -------------- $ 280,061.71
----------
--------
STATE HIGHWAY BOARD OF GEORGIA
Schedule No.S-B
ANALYSIS OF CONSTRUCTION EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Object of Expenditure
Surveys
Actu~~ Plans
Total
Construction
Total
Supervision Direct ~--T-otal~ Expenditures
--~--1
Personal Services______________ $ Equipment Expenses __________ Communication Services ______
49,016.87 ------------$ 921.85 -----------62.98 ------------
49,016.87 $ 327,873.53$ 921.85 3,951.65 62.98 1,150.69
315,286.761$ 299,849.20
1,851.30
643,160.29 $ 303,800.85
3,001.99
692,177.16 304,722.70
3,064.97
Heat,Light,Power & Water ____ TRreanvtesl_i_n_g__E-x-p-e-n-s-e--s--_-_-_-_-_-__-_-_-_-_-
---------11.10
6,602.65
Supplies and Materials ________ 2,492.04
Insurance ________ . ----------- ------------
--------------------------------------------------------
-----------11.10
6,602.65 2,492.04
------------
-----------358.54
65,244.09 14,087.01
18.00
3,066.70 64,155.16 4,842.93 766,600.54 3,305.47
3,066.70 64,513.70 70,087.02 780,687.55 3,323.47
3,066.70 64,524.80 76,689.67 783,179.59 3,323.47
Printing,Binding,Publicity,
Etc. _______ -----------------
261.61 ------------
261.61
9.15
3.30
12.45
274.06
Payments to Contractors _____
700.00 ------------
700.00 --- -------- 9,470,838.02 9,470,838.02 9,471,538.02
Special & Mise. Expenses ______ 91,523.56,$ 88,338.32 179,861.88 31,308.671
6,259.62
37,568.29 217,430.17
~----,
'
------,~----- --~~
Totals ___________________ $ 151,592.66,$ 88,338.32 $ 239,930.98,$ 444,001. 33 $10,936,059.00 $11,380,060.33
,$11, 619,991.31
Total Construction Expenditures-Exhibit "C" ______________________________________________________ _ ----- I
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF MAINTENANCE EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 8-C
GENERAL MAINTENANCE
\
RECONSTRUCTION
I
SHOP
OBJECT OF EXPENDITURE
- Sup- ervi- sion-
PersonnJ Services ________ _
38,313.17
Direct 563' 453.45
-==1 ---s=-1- == Total
Direct ~--T=~-
!"et~;~~:~~~;s- S~~-
861--~=3 601,766.62 --- -------- $ 5,250 601 $ 5,250 60---:.503
86
Equipment Expenses _____ _
83.40 415,830.22 415,913.62--
1,434.83
1.434.83
7,624.63
7,624.63------------
Communication Services __ ~ Heat, Light, Power and
Water ________________ _ Rents__________________ _
Traveling Expenses ______ _
5,337.73
45.80 579 50 16,351.25
1,832.64
931.16 3,585.36 5,219.26
7,170.37 ------------ --------------
976.96 ------------ -------------- ---------
4,164.86------------
40.00
40.00
21,570.51 ------------
8.50
8.50
975.69
1,700.44 50.00
1,650.95
975.69
1,700.44 __ 50.00 --
1,650.95 --
Supplies and Materials. __ _ Insurance ______________ _
1,809 58 285.00
94,985.32 12,999.43
96,794.90 -----------13,284.43 -- --------- --
7,467.06
7,467.06
158,039 62 345.30
158,039.62-----------345.30 ------------
Printing, Binding,
Publicity, etc _________ _
21.85
23.46
45.31 --
5.35
5.35
Payments to Contractors __ ---------------------------------------------------------------------------------- ___ ---------- __ -----------
Special and Miscellaneous
Expenses______________
83.55
82.88
166.43
16.72
1.50
18.22
37.65
37.65 ------
Totals_________
62,910.83 $1,098,943.18 $1,161,854.01
16 72 14,202.49 14,219 21~~3,933.~; $ 233,933 49~=~~~
~~=c==-
l==c==c~==',c-==~ - = = = ' = = ' - t = = = = c =
Total Maintenance Expenditures-Exhibit "C" ------ _________ -------- ____________________ ------------- _________________________________________________ -----
Total Net Expenditures
607,017.22 417' 348.45
7,17037 976 96
4,204.86 21,579.01 104,26196 1:l' 284.43
4.5 .31
184.65
$1,176,073.22
Schedule No. 8-D
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF EQUIPMENT EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
============================~====~~===-
Ex~~~eJi\~:es
I At~~ii~~-~' Co~~~~uc-~I M~~~=n-
Total Expendi-
tures
Trucks ______ _______ I$
4, 581. 80 I __ _ ____ 1$ 5, 066. 80
Road Machinery, I Misc. _ _____ ___
I
1
7, 678. 70 $
1, 371. 98 I
9, 070. 03
Office Equipment __
___ _ __ I ______ I 1, 775. 77
Engin3ering Equip-~
~~1rioutvment f :____I __2._o4o._1~~-- ~~:~~~-2j~Jt
Totals _______ $ 2, 280.12 $1 14,300.62 ]$ 2, 114.27 ]
1
1
Total Equipment Expenditures-Exhibit "0"---------\$ 18,695. Ol
Schedule No. 8-E
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF LEGISLATIVE TRANSFER EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Transfer 1 Motor
Object of
General
Vehicle Con-
Total
Expenditure
Fund
License vict Expendi-
1935 Act I Tags
Farm
tures
------c-1 --- ------------I ----------'c-1_ ______.:__ _ _ __
Special & Misc. Ex-
;
I
1
pense Transfer oft
1
I
Funds _____________ 1$2, ooo, ooo. oo 1$ 60, 059. 69 $546. 93 _$2_,_o_6o_._6_06_._62_
Totals ___________ $2, 000, 000. 00 I~ 059. 69 ]$546. 93 1
1
Total Legislative Transfer ExpendituresExhibit "0" ____________________________________ $2, 060,606.62
1
58
Schedule No. 9
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF EXPENDITURES BY CONGRESSIONAL DISTRICTS
JULY 1, 1934 TO JUNE 30, 1935
,
I
I (Analysis) I (Analysis)
(Analysis) .(Analysis); (Schedule 1 (Schedule
Dis- rschedule '(Schedule' No.10-D) 1I No.lO-E)
tricts No.10-B) I No.10-C) I Mainten- . Recon-
:construction Surveys
ance , struction
Total Expendi-
tures
--,------~-----------.--~--
-------
No. 1 $ 9?6, 498. 34 1$ 8, 185. 11 $ 95, 974.06.$ 1, 282.86 $1,081, 940. 37
2
6D1, 938. 74 10, 662. 69 95, 754. 19' ... _........ . 758, 355. 62
3
796, 754. 24 15, 732. 94 91, 132. 04 . . . . . . . . . . . . . 903, 619. 22
4
841, 134. 44 19, 425. 281 68, 395. 82 .. .. . .. .. .. .. 928, 955. 54
5
424, 337. 25,1 40, 778. 55: 19, 856. 93.......... ... 484, 972. 73
6 1, 314, 039. 03 14, 935. 35' 84, 369. 251'.... .... .... . 1, 413, 343. 63
7
953, 107. 96 34, 644. 17, 91, 477. 11 324. 57 1, 079, 553. 81
8 1, 242, 775. 94 14, 159. 841 103, 886. 33\ 3,047.10Cr. 1, 357, 775. 01
9 1, 091,059. 42 19,822. 761 127, 793.32, 7,346.63 1, 246,022. 13
10
701, 193. 63. 11,044. 60, 90, 682. 201............. 802, 920.43
11 1, 104, 812. 871 28, 751.06 145, 606.24 ............. 1, 279, 170.17
12 1, 282, 408. 47 21, 788. 631 146, 926. 52 8, 312. 25 1, 459, 435. 87
I
-~~~~~------------
Totalsl$11, 380,060.331$239, 930. 98,$1,161,854.01,$14, 219.21 I
Total Expenditures Distributed by Districts ............ $12,796,064.53
Undistributed by Districts Administration General Office..... $ Warehouse ........ DlViswns ........ .. Research __ .. _____ .
Collection of Revenue............ .
Quarry______ ____ _
197,599.85 13,348.89 28,760.34 175.39
39,020.14 1, 157. 10
$280, 061. 71
Land, Buildings & Equipment_ .. _. __ .
Legislative Transfers
Prison Farm Purchase............
Motor Vehicle Li-
cense Tags. ..... Transfers-Gen-
eral Fund-1935 Act._____________
$
546. 93
60, 059. 69
2,000,000.00
$ 18, 695. 01 2,060,606.62
Total Expenditures Undistributed by Districts ..... _.. $ 2, 359, 363. 34
Total Expenditures-Exhibit "C" --------------------- $15,155,427.87
59
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENDITURES BY DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935
Schedule No.10.
Divisions
I (Analysis)
(Schedule No. lO-B)
Construction
Div. No. L ____ $ 2_---3 _____
3, 197,353.35 1$ 4,318,482.42 3,864,224.56
Totals____ -I$ 11,380,060.33 $
(Analysis) (Schedule No.10-C) Surveys
67,929.67 58,906.39 113,094.92
I (Analysis) (Schedule No.10-D) I Maintenance
$ 384,195.33 413,179.55 364,479.13
239,930.98 $ 1,161,854.01
(Analysis)
(Analysis)
(Schedule
(Schedule
No.10-E)
No.10-A)
Reconstruction Administration
Total Expenditures
$
B l 5,834.13 I$ - 9 , 108. Bs~$-3, 664, 420.
3,760.98
8,944.88
4,803,274.22
I 4,624.10
10,707.13
4,357,129.84
$ 14,219.21 ~-$--28,700341
Total Expenditures Distributed by Division Units______________________ __________ ___
0>
0 Undistributed by Division Units
Administration
General Office___________________________ _________
.$
Warehouse ___________________________________________________ _
Research ___________________________________________________ _
Collection of Revenue _________________________________________ _
Quarry________________________ _______________ _________________ _
197,599.85 13,348.89 175.39 39,020.14 1, 157. lO $
___ $ 12, 824, 824. 87 251,301.37
Land, Buildings and Equipment _________________________________ _
18,695.01
Legislative Transfers Prison Farm Purchase ___________________________________________ $ Motor Vehicle License Tags ____________________________ _
546.93 60,059.69
Transfers-General Fund-1935 Act ______________________________ _ 2,000,000.00 $ 2,060,606.62
---------------
Total Expenditures Undistributed by Division Units ____________________ _
-$
2,330,603.00
Total Expenditures-Exhibit "0" ___________ _
________ $ 15,155,427.87
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENDITURES BY UNITS
JULY 1, 1934 TO JUNE 30, 1935
Furnishing
Special
Heat,
Printing,
and
Personal Equipment Communi- Light,
Traveling Supplies
Binding, lndemni- Miscel-
Total
UNIT
Services Expenses cation Power and Rents Expenses and Insurance Publicity, ties
laneous Expenditures
7r_ _ _ _ ________________________________________ Services Water
Materials
Etc.
Expenses
GEN~"':~is~::!;,~------------------ J s 32,707 ...------1----------1--------J_________ $6,523
s 39,231.32
~~n:::~:E~~~~::~~-::::::::::::::
3~.9:.5H6~3_~3~23 6 2 2 ::::::::_: ::_:-::::_ -
-
~ -
:~ ~ :
::-:--:-
- ;;~o:; - ::
: .:: :14!1.:66~9;91.~9:88
Accounts........ ________________
_________ _ _____ __ __ _______ __________ 2,136.65---------- ---------- ---------- ---------- ----------
Statistics________________________ 7,507.50 ---------- ---------- ---------- ---------- 120.65 ---------- ---------- ---------- ---------- ---------- 7,628.15
~~:~:~~:~;~~-c-1~;~~::::::::::::: ---~::~::.~~ :::::::::r:::::::: :::::::::: :::::::::: :::::::::: :::::::::: :::::::::: :::::::::: sio:s7i:48 :::::::::: :~:~~; :~
Undistributed.. __________________ 10,498.50 $1,332 05i$10,45~~~228.~ $3,021.50 ~ $13,485.34 $2,601.73 ~~7.63 10,740.66 $1,340.07 ~~
TOTALS __________________
$207,725.53
$1,332
1
05 $10,459
281 $3,228.91
$3,021.50$16,224.78$13,485.34
$2,601.73
$5,833.86!$21,612.14
$1,340.07
$286,865.19
Less: Blue Print Billings______ . ____ -~~~8 57 .:_::.:_::::_:_:_:_:_::1.:.:.:.::.:..:. .:.:.:.::.:..:. .:..:.:.:_::_:_:_:_:_::1.:.:.:.::.:..:. 11,876. 77 .:.:.:.::.:..:. .:.:.:.::.:..:. .:..:.:.:.::_:_ ___ ._. _. _. 89,265.34
TOTALS.. ________________ $130,336.96 $1,332.05$10,459.28 $3,228.91 $3,021.50$16,224.78 $1,608.57 $2,601.73 $5,833.86$21,612.14 $1,340.07 $197,599.85
1----!1~--- ---------~------~-~-------------1~---
WAREHOUSE.. _____________________ $ 10,165.83 405.07 $ 26045 $ 296 34 ---------- $ 882 90 $ 776.59 $ 21.00 ---------- ---------- $ 540.71 $ 13,348.89
l----l---------------~-~--------------~-----1----
DIVISIONS Number One____________________ _
Number Two ___________________ _
Number Three_. ___ ._ ......... __ _
4,540 00 4,342 50 6,205 00
24 251 $1,439 63 38 96 1,942 86 292 06 1,432 12
16 05 $ 577 501 $1,387 45 $ 791 59 $ 331 86 ---------- ---------- ---------- $ 9,108.33 10 03 ---------- 1,404 25 978 04 228.24---------- ---------- ---------- 8,944 88 41 00---------- 1,405 40 947 61 383 94 ---------- ---------- ---------- 10,707 13
1---~---~~---~---~-~-----------------------
TOTALs __________________ Total Genera! Administration______
$ 15,087 50 $155,590 29
$ 355 27 $4,814 61 $2,092 39 1 $15,534 34
1
$ 67 08 $ 577 50 $4,197 10 $2,717 24
33~~599 781~102 1
$3,592
00,$21,304
40
$ 944 04 ---------- ---------- ----------
$3,566 771 $5,833 86 $21,61214 $1,880 78
1
$ 28,760 34 $239,709.08
UNIT
Personal Servicei
Schedule No. 10-A-Conl"d.
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF ADMINISTRATION EXPENDITURES BY UNITS
JULY 1, 1934 TO JUNE 30, 1935
-
-
Furnishing I Heat,
Equipment Communi- Light, Expenses cation Power and
Services Water
Rents
Traveling Supplies Expenses and
Materials
1
i
Insurance
Printing, Binding, Publicity.
Etc.
lndemnities
Special and
Misoellaneous Expenses
To tal Expen ditures
~ RESEARCH AND ANALYSIS
----1 Division of Tests ___________ _
Division of Research _______ _
$
935 89 175 39
8 39
I
I
903 .34
$2,743.98 $2,09G.88
I
27.00 -
$1,958.28 $ 2G.8\l9.43
I
175 39
I --------
TOTALS ____ _ LesR: Te:;;t Billings ___ _
TOTALS _____ _
s 18,225 oil $1,111.28
s 8 :J9 1 903.34 __
I 18,225 671 935.891
8 39 1 903 34:-
----~~---~~~-~--~--$~,;;9~1 ---~-~-~ :1 ~--~~~~~-
=-_: - - ' -1 $2,743.98 $2,096 88 $
-- 2,743 98 2,091i.88
__ _ _ l____ i
27 oo.
_________ , $1,958 28, $ 27.074.83
27 00 --
--------- 1,958.28 21i,8\1943
--:=~~ ~~~ ~I1 .~~-~~-;- - 175.39
_, _ _ _ _ _ __
--~~;~9J;~~~]~~~~9:!~~~ ~~-~ ~~~3 COLLECTION OF REVENUE Enforce of Revenue Laws ____ _
r,sl $ 32 oo!
J
~ ~~~=: 14
QUARRY _____________ _
I $ 1,043 so s 13 61 $
40 1
46.90 :-----~-----~~ - - - - - - sz 6~ -;-~~~-1~
TOTAL ADMINISTRATION___ ~~~~;-3~:~~~~~;~~~;;69 $~5~2_;; --;3~599 oo:s;~~~~ ~~~44~~ $~51iG7<__$s~~3_81i $21,612 14; ;~;;:;~ ~280,061 71
I
I
--------------------
! -------
8TA,._ H - A Y - OP - A ANALYSIS OP ACTUAL CONSTRUCTION UPENDITURIUIBY CONGR-IONAL DISTIIICTII AND DIVISIDM ut11'1'S
JULY 1, 1934 TO JUNE 30, 1135
___,__
Personal Services
1 Furnishing'
Equipment Communi- Heat,Light,l.
I I Expenses
cation I Power and
I Services Water
Rents
\ Traveling \ Su=~~os \ Insurance\ ~~~:~:: \ Payments to \ Sp:::.~~d \ Total
Expenses Materials .
Publicity Contractors laneous Expenditures
Etc.
Expenses
District No. !_____
~:::::
4_____
~:_:_: :
8_____ 9_____
10_____
11_____ 12...
29,179.55
~~:;~!:;~
19,951.11
iE~H~
33,495.71 38,878.57
17,440.62
34,451.54 32,844.33
288.47
2~;:!~
185.89
HUr
608.14 651.37
54.64 426.17 398.26
CONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS
201.12 6,685.11 S 1,032.83[ $ 1 __________
------------
$
1.87 ----------~--------------
::~:~~~1:::::::::: s ~~:~~ ~:;~::~: 1.~~~:~: :::::::::: -~----~:~: ::::::::::::::
15.32----------
50.00 4,573.95
933.81
1.00 _________ _!______________
~nL:~:~~~:~ -------4~:~~ H~U~ d:U~~::::::i:~~ :::~~~::::!::~~~~:::::~:~
103.98---------92.27---------69.35---------246.92 ---------87.28----------
28.50 15.00 67.40 4.00 45.00
6,530.75 6,372.43 4,703.73 7,643.30 7,057.77
1,779.471'---------- ----------~~--------------
1,357.03
5.61 ---------- --------------
839.64
1.87---------- --------------
1,613.64 1,718.991
1.00
4.58 --------------
2.91-- _______ !______________
2,765.281 $ 40,151.23
~:~:;::: ~!:~1~:;~
2,144.55
27,855.63
HH:!! iUiU!
2,887.44 2,870.17 2,351.92 3,473.46 3,467.55
45,433.99 50,242.45 25,529.17 47,864.61 45,622.09
TOTALS__________ S 327,873.53! $ 3,951.65 $1,150.69 ==-$-358.54 $ 65,244.09 $ 14,087.01~~;:-~-;~! ___________ __I$ 31,308.67 -;-~~~~;;;
= = = = ======.===== ====!==== ======1======,==== = = = = = =====,======
CONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS
s s District No. !__ ___
36,454.53 $ 32,097.14 $ 71.90 $ 39.52 $ 126.50 $ 733 0 50 $ 64,963.32 $ 520.26 $ 3.30 $ 801,267.14 $ 67.00
936,344.11
2__ ___
s__ ___
10,223.62 14,857.70 26,095.71 2,374. 70
140.04 30.82
411.87 46.03
150.00 8,544. 71
82.39 33,558.30 609.75 15,006.15
-- 174.13 ---- -~-57.00 ----------
565,669.51 709,823.32
407.44 121.95
625,675.00 762,710.14
L ...
15,948.10 26,205.36 214.65 551.55
103.00
453.28 35,343.50 178.13 ----------
5_____ -------------- ------------ ---------- ---------- -------------- ----
2, 799.26 ---------- ----------
733,942.14
339.10
398,449.55 -----------
813,278.81 401,248.81
6 ----
17,164.29 11,660.67
50.52- -------- 18' 609 0 72
105.15 70,824.83 ---------- ---------- I, 157,587.42
67.26 1,276,069.86
7__ ___
8 ____
52,038.37 49,980.32 13,945.70 8,009.86
235.82 24.06
653.64 7,280.87 23.80 11,615.57
546.25 96,471.21 336.00 ---------- 704,998.58
195.24 36,704.36 ---------- ---------- I, 126,793.85
633.19 913,174 0 25 29.51 1,197,341.95
9..... 10 _____
II__ ___
12.. ...
40,989.56 39,448.77
13,523 03 14,954 01
"%,'"I ".'"Mt 49,946.46 65,996.811
316.61, 14.10
"'"I597.51
17.56 29.50
"".'"759.53
5,175.01 12,101.48
273.30 175.00
326.59 204.65 946.14 639 0 99
82,718.12 65,800.04 84,237.33 178,174.12
629 0 72 ----------
119.43
634. ooi
-_-__-_-_-_-_-_-_-_-
656.801.:..:.==
869,888.28 568,904.66 896,144.47 937,369.10
1,306.75 13.56
802.80 2,471.06
1,040,816.97 675 '664. 46
1,056,948.26 1,236,786.38
s s TOTALS__________ 315,286.76 $299,849.201 S1,851.30[ $3,066.70 64,155.161 $ 4,842.93 $766,600 0 54 $3,305.47 $
' 3.30 $9,470,838.02 6,259.62$10,936,059.00
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 1D-B-Cont'd.
ANALYSIS OF ACTUAL CONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935
Personal Services
Equipment Expenses
IFurnishing
I Communication
I1HPeoawt,eLrigahndt,
Services Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing, Binding, Publicity
Etc.
Payments to Contractors
Special qnd Miscellaneous Expenses
Total Expenditures
CONSTRUCTION SUPERVISION BY DIVISION UNITS
~ Division No. L ___ _ 102,444.23
942.76 688.52 ----------
149.00 $ 19' 693.00 4' 128.19
1.00 $ 9.15 -------------- $ 10,183.47 138,239.32
2 ____ _
96,507.12 1,477. 72 158.26 ----------
117.40 24,260.47 5,018.94
7.65 ---------- -------------- 11,139.06 138,686.62
3 ____ _ 128,922.18 1,531.17 303.91 ----------
92.14 21,290.62 4,939.88
9.35 ---------- -------------- 9,986.14 167,075.39
-------1-----1---- -------------------- ----1-----1----1------
TOTALS_________ _ 327,873.53 3,951.65 $1,150.69 ---------- $ 358.54 $ 65,244.09 $ 14,087.01 $ 18.00
9.15-------------- $ 31,308.67 444 '001.33
1==~~1
CONSTRUCTION DIRECT BY DIVISION UNITS
Division No. L ____ 2 _____
$
82,806.48 124,537.60
$ 56,794.49 145,500.03
$
328.03 946.78
$1,013.12 1,358.58
$ 8,968.01 31' 115.70
$
1,899.03 1,839.12
$149,717.74 395,976.79
$ 865.13 ----------
1,474.62 $ 3.30
$2,755,322.81 3,474,152.30
$
1,399.19 2,890.98
$3,059,114.03 4,179,795.80
3 _____
107' 942.68 97,554.68
576.49
695.00 24,071.45
1,104.78 220,906.01
965.72 ---------- 3' 241,362.91
1,969.45 3,697,149.17
---- - - - -----
TOTALS__________ $ 315,286.76 $299' 849.20 $1,851.30 $3,066.701 $ 64,155.16 $ 4,842.93 $766,600.54 $3,305.47 $ 3.30 $9,470,838.02 $ 6,259. 62,$10,936,059.00
I
=I
I
I
I
I
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935
-.ollieMo.\.C.
Personal Services
Equipment Expenses
I Furnishing
Communi-~ Heat,Light,
cation Power and
Services Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing, Binding,
Publicity Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
SURVEY ACTUAL BY CONGRESSIONAL DISTRICTS
Ol District No. 1. .....
""
2.....
828.47 3 '902.46
1.65 87.91
21 . 2106!1,_-_-_--__--_-_-_-_-_ -_-_-_-_-_-_ 1
121.12 509.73
41.421--------110.01,.........
-------------
2,721.58 229.30
3,716.50 4,850.51
3 ......
4._ ___
5 _____
6 ____ 7 _____ 8 _____
3,379.58 2' 194.:34 4,328.38 4,477.74 4,507.94 4,417.82
104.76
,47'_ _________ --
18.43---------- ------- $
7.10
45.86
1.00----------------------
31.90
5.05 .......... -
76.58
5.73 -------- -----------
153.87
1.00-
--- ------------
398.34 419.56 290.11 81\1.62 355.52 602.71
114.28 ---------- ---------- --------------
207.10 11 . . . . . . . . . . - - - - -
700.00
147.54---------- $ 14.70 --------
209.92 .......... .....
--------------
151.46----------
6.25
222.28-------------------- --------------
6,364.66 8,457.77 27,041.53 1,670.4:l 17,409.15 1,812.75
10,:362.09 12,004.30 31,869.12 7,214.66 22,512.63 7,210.43
:___________ :________ 9-~---
10 _____
3,955.05 1, 739.35
52.26 25.53
!:~~~-::::----
!!~:~~ :~~:~~
1~5531:.~2~8~:_:_:_:_:_:_:__: __ :_:_:_: ~:~~::;~1 1~:~!!:;~
1L.. 12 _____
8,644.81 6,640.93
138.76 184.34
16.17 ---------- -----------
16.28 __
4.oo
1,279.42 1,065.39
747.49 ---------274.30:------- ..
1--------------- -
9,031.631 5,827.83;
19,911.56 14,013.07
----1---1-----~~-~---,----- - - - - - - -1----- - - - - - - - - - - - - - - - - - - , - - - -
TOTALS __________
49,016.87
921.851 $ 62.98---------- $
11.10 $ 6,602.65 $ 2,492.04 1__________ 1 $ 261.611 $
700.00 $ 91,523.56 $ 151,592.66
I
I
I
_I
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 10-C-Cont'd
Personal Services
Equipment Expenses
Furnishing Communi.. Heat,Light,
cation Power and Services Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing, Binding, Publicity
Etc.
Payments to Contractors
Special qnd Miscellaneous Expenses
Total Expenditures
SURVEY PLANS BY CONGRESSIONAL DISTRICTS
~ 1 "''''" No.l :
:: : :: J :
~
!lE ;~ t!E l~
I 1 - -- -- - - -
~ ~ ~ ~ M"'__::
t1 11 '!:E!l
1 --------I-$-S-:-:-::-:-:-: --.-:-:--::-:-:
Personal Services
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 1~Con\'ll.
ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935 --
Equipment Expenses
Furnishing/ Communi.. Heat,Light,
cation Power and I
Services Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing,
Binding, Publicity
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
SURVEY ACTUAL BY DIVISION UNITS
rn Division No. L ____ $
__,
2_____
3_____
19,166.37 $ 11,806.09 18,044.41
367.09 $ 312.64 242.12
38.53 _______ 13.80--10.65 --- -----
4.001 $ 2,796.97 $ 1,012.49 _
7.10' 2,:307.28
843.99 ----
----- 1,498.40
635.56---- ---
53.281 _________ $ 21,589.45 $
21.60
700.00 15,295.95
186.73,______
54,638.16
45,028.18 31,308.45 75,256.03
TOTALS_____ --- ~~-$--~-;-;:2.98-_-_-=-$-- 11.10 ~~~~~~~-~-;~;;-;--;- 700.00 -~-;;1,523.56 -;~~~;;
_ _ _ _ _ _ _ _ __.,=__- __-_-_.__ = = = = - - - - - - - = = = = =~~=-----=========,-===
SURVEY PLANS BY DIVISION UNITS
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENERAL MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 10-D.
Personal Services
Equipment Expenses
Furnishing Communi- Heat.Light,
cation Power and Services Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing, Binding, Publicity
Etc.
Payments to Contractors
Special and Mlscellaneous Expenses
Total Expenditures
MAINTENANCE SUPERVISION BY CONGRESSIONAL DISTRICTS
"'00 District No. L .... 2. . . . . 3 4. . . . . 5. 6. 7----8 9.. 10. . . . . 11... 12..
TOTALS.
3,123.61 $
6.99
3,439.10 ------------
3,136.56
12.80
2,693.87
9.53
765.42 ------------
2,914.77
10.21
2,865.01 ------------
3,365.93
1.07
4,150.79
4.00
2,914.08
18.27
4,992.84
9.40
3,951.19
11.13
454.41 470.84 459.80 395.70 90.62 455.53 339.30 402.75 507.89 439.61 738.58 582.70
38,313.17
83.40 $5,337.73
4.67
62.05
4.60
151.20
2.81
92.50
.66
.35
1.53 ------------
.80
. 37
5. 79 ------------
6.26
.05
8.44 ------------
.52
.40
8.14
220.68
1.58
51.90
1,257.80 1,422.15 1,279.95 1,094.07
354.07 1,185.20 1,366.48 1,577.26 1,977.10 1,177.41 2,066.48 1,583.28
45.80
s 579.50! 16,351.25
219.52 105.25 132.80 155.40 47.27 193.26 134.82 117.20 134.83 182.02 173.25 213.96
1,809.58
"T22.661---------- --------------------------22.99 --------- -------------19.32 ---------- -------------6.10 ---------- -------------21.20 .......... -------------22.90 ---------- -------------26.75 ---------- -------------33.15 $ 8.58 -------------21.19 ---------- --------------
35.70 13.27 -------------27.71 ---------- --------------
285.001 $ 21.85 --------------
5.28 10.67 7.58
. 27 1.64
.34 5. 72 2. 62 26.62
.23 19 15 3.43
5,156. 99 5,629.14 5,147.79 4,369.17 1,276.65 4,781.68 4, 740.02 5,499.89 6,851.40 4,753.73 8,277.49 6,426.88
83 551 $ 62,910.83
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 10..0-Cont"ll.
ANALYSIS OF GENERAL MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935
~-
-
Personal Services
Equipment Expenses
IFurnishing]
Communi- Heat,Light.
I cation Power and
Services Water
Rents
Traveling Expenses
Supplies and
Materia is
Insurance
Printing, Binding, Publicity
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
1
MAINTENANCE DIRECT BY CONGRESSIONAL DISTRICTS
ffi District No. L___
2_____ 3_____
~:::::4_____
J 49,950.251 $30,937
45,914.74 34,755.881 44,816.59 34,664.13 39,257.50 21,065.47
:u~u~ !tm ~il
122451 199 69 152.781 8193
:!~!:
14.72 52.38 48.98 50.62
1~~ H
117 50I 244.00 156.21 46.00
HH~
507~30! $ 8,010 441 $1,156 97'.----------1--------------~~------------1 S 90,817.07
630.901 450.62
7,092.55' 4,531011
1,234 911 __________ --------------
1,083.09' $ 5.84~--------------
-----------$ 75.001
90,125.05 85,984.25
168.49 2,446.281 905.11
5.25--------------------------
64,026.65
~!! ~:1 dH ~:r 1~~! H:::::::::::::::::::::::::::::::::::: H:m ~~
8_____
52,857.63 38,019.86 184.07
98~93
422.25
416.01 5,338.77 1,048.92------------------------------------
98,386~44
9----10-----
62,181.39 42,921.12
46,957.58
31,475~39
25194 83.41
131 61 42 10
795 74 395 5o
556 73 241 52
8,768 64 1,293 911------------------------
4 38
9,7G3 4:3 1,006 oo __________ ______________ ____________
120,941.92 85,928.47
1L___ 12.____
72,920.67 48,806.16 60,388.17 51,349.61
291.40 118 62
175
135.14~--467
00 1,067 00-- 482
16 12,164 80_2~165
121 1,785 201-~342
36271-1--------~--:-~----------------------------
-----------3 50
137,328.75 --1~~9 64
82~88 TOTALS_________ $
=
563,453.45
-__: "- -------=
$415,830.22 ==
$1,832 641 $ 931 16 $ 3,585.36 $ 5,219.26 =.=====--=-:-= c=:::-=-=.-::;==------=-=-----'
=-=::___----= -
::$--=9:::4-.,-9_-8--5-=-:3-:2.=1,=$-1---2-:,:-9--9--9-:-4=3-=1-=$-=--:-2:-3=.--4=6
;
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1
$ =
$1,098,943.18
= =.= =::::....-==
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENERAL MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 10-D-Cont'd.
Personal Services
Equipment Expenses
I Furnishing
Communi-~ Heat,Light, cation Power and
Services Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing, Binding, Publicity
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
_,
MAINTENANCE SUPERVISION BY DIVISION UNITS
0
Division No.!_____ 2_____ 3_____
13,105 73 13,311 48 11,895 96
10 401 $1,849 38 $ 21 80 $ 577.50 $ 5,420 341 $
69 001 2,069 96----------
2.00 5,269 061
4 001 1,418 39
24 00------------ 5,661.851
461.06 898.91 449.61
95.00 $ 13.271______________
95.00---------- --------------
95.00
8.58 --------------
45.04 1.07
37.44
21,599.52 21,716.48 19,594.83
TOTALS---------~~~:~.~~~~~~~~~~~~==~:~~~=~~~
MAINTENANCE DIRECT BY DIVISION UNITS
Division No. l _____
161-- ----- -1--------- ----------- --- 2_____
$
191,115.20 195 '614 .43
$135,418.64 143,129 09
$
762.57 371.15
$
222.18 331.84
$
590.21 1,084.00
$
2,698.78 945.10
$ 27,064 071 $4,724 45,324 40 4,561 10
$
23 46 ---- --------- $
_____ 3 _____
176,723.82 137,282.49
698.92
377.14
1,911.15 _
1,575.38
____
_ _2_2._5_96-85
3, 714 11 =__:_~]------------
$ 362,595.81 78 50 391,463.07
4__3_8 __3_4_4_,8_84_._30
--------
1
1
TOTALS __________ $ 563,453.45 $415,830.22 $1,832 64 $ 931.161 $ 3,585.36 $ 5,219.26 $ 94,985 ~211$12,999 43 $ 23 461 --------- $
82 88 $1,098,943.18
I
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 1G-E.
ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
Personal
JULY 1, 1934 TO JUNE 30, 1935
Equipment
I IFurn~.s.hmg,
Communi- Heat,light,!
Rents
Traveling
Supplies and
. . .~I Printing, Binding,
Payments to
Services
Expenses
I cation Power and Services Water I
Expenses Materials
Publicity Contractors Etc.
Special and Miscellaneous Expenses
Total Expenditures
RECONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS
i . ~ . ~ ~ Dis~rictNo.
1
1
1 1 .
8_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------
g_____ -------------- ----------
"----- IQ_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- -------- - -------------- $
16.72 $
16.72
-------------- ------------ ---------- -- ------- ------- ---- ------------ ------------ ---------- ---------- ------------ - ------------ --------------
--------------1------------ __________ _ _ _ _ _ _ -------------------I- ------------1 12_____ -------------- ------------ ---------- ---------- ---------- --~------------ ------------ ---------- ---------- -------------- ------------ --------------
TOTALS _________
==~~==~~---------
$ 16.72 $
16.72
Schedule No. 10-E-Cont'd, STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935
Personal Services
Equipment Expenses
I Furnishing
Communi-~ Heat,Light, cation Power and
Services Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing, Binding, Publicity
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
RECONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS
;::3 District No. !_____ $ 829.91 $ 285.31 ---------- ---------- ------------ $ 8.50 $ 159.14
------- $ 1,282.86
2_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------
3 _____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------
4_ ____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------
5_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------
6_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------
7_____
168.20
35.16 ---------- ---------- $ 40.00 ------------ 81.21 ---------- ---------- -------------- ------------
324.57
8_____
701.65Cr. 87.50Cr. ---------- ---------- ------------ ------------ 2,257.95Cr. ---------- ---------- -------------- _____ _
3,047 .IOCr.
9_____ 3,332.53
903.97 ---------- ---------- ------------ ------------ 3,093.41 ---------- ---------- -------------- ------------ 7' 329.91
10_____ -------------- -- --------- ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------
11_ ____ ----------------------------------------------------------------------------------------------------------------------- ----------------------
12_____ 1,621.61
297.89 ---------- ---------- ------------ ------------ 6,391.25 ---------- ---------- ------------- $
1.50 8,312.25
TOTALS __________ $ 5,250.60 $1,434.83 ---------- ---------- $ 40.00
8.50 $7,467.06 ~==i--------------1 $ 1.50 $14,202.49
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935
Sollodule No. 111-E-Confd.
Personal Services
Equipment Expenses
Furnishing Communi- Heat,Light,
cation Power and Services Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing Binding, Publicity
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
RECONSTRUCTION SUPERVISION BY DIVISION UNITS
~ Division No. l _____ -------------- ------------ ---------- ---------- ------------ ------------ ------------
2 _____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------
3_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ------------------------ $ 16.72 $
16.72
TOTALS__________ ===~~====!---------- ------------1------------1------------ ---------- = = ---- -----1 16.72
16.72
1
RECONSTRUCTION DIRECT BY DIVISION UNITS
Division No.!_ ___ _ 2 ____ _ 3 ____ _
TOTALS _________ _
1,458.86 992.66
2,799.08
5,250.60
297.89 ---------- ---------- ------------ ------------
285.31 ---------- ---------- ------------ $
8.50
851.63 ---------- ---
$ 40.00 ------------
1,434.83
40.001 $
8.50
4,077.38 ---------- ---------- -------------- ------------
2,473.01 ---------- ---------- -------------- $
1.50
916.67 ---------- ---------- -------------- ------------
5,834.13 3,760.98 4,607.38
7,467.06:----------1== = = = -;--~~ -;-14,202.49
'
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 11
OBJECT OF EXPENDITURE
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
;~--~.--~--- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
General I Research
Administra-
and
tion
Analysis
Collection of
Revenue
Quarry Construction
Surveys
Maintenance and Recon-
struction
Shop
Land, Buildings
and Equipment
Legislative Transfers
Total Expenditures
PERSONAL SERVICES
G. 0. Administration
Administrative ____ _ $ 36,841.63 ------------ ---Others. ____________ _ 180,629.41 ------------ ------------
Field Office
Administration
Administrative ____ __ Others .. ___________ _
9,900.00------------ ---------5,187.50----------------------
Research and Analysis
Administrative _______ ---------- __ $ 3,022.58------------ ----------
Others _______________ _
15,203.09 ------------ ---------- -------------- ------------ -------------- ------------ ------------ ------------
G. 0. Shop
Administrative.______ ___
------------ ------------ ---------- -------------- ------------ -------------- $ 2,400.00 ------------ ------------
Others ______________ -------------------------------------------------------------------------------------- 7,027.94------------ ------------
Su~:;:!st\~~op::v-:s~~~~~:_t_ ~9-:-.~0- -__-_-_- :_-_- -- _-_ ---- :__--__--_:-_ _::_-__----- :_-_-_- :_- :::_--_ :: ----:;--, 0
:_--__--_ ::--------: -------------- 54,075 92 ------------ ------- ____ _ 23,694.87------------ ------------ ------------
Others. ------------------------ ------------ ------------ __________
16,977.53------------
14,618.30------------ ------------ ------------
Direct Costs
Survey Parties _______ ------------------------------------------------------------ $ 46,419.87-------------- ------------ ------------ -----------Maintenance
Patrolmen _________ ------------------------ ------------ ---------- -------------- ------------ 152,229.93 ------------ ------------ ------------
:16,841. ti:l 180,629.41
9,900.00 5,187.50
3,022.58 15.203.09
2,400.00 7,027.94 54,075.92
334,590.87 31,595.83
46,419.87
152,229.93
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. llCont'd.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF
Land,
EXPENDITURE
General Research Collection
Maintenance
Buildings
Administra-
and
of
Quarry Construction Surveys and Recon-
Shop
and
Legislative
Total
tion
Analysis Revenue
struction
Equipment Transfers Expenditures
-----------------1---- -----1------1-----1-----1---- --------- 1-----
Direct Costs
~
Constr. and Recon~
struction Foremen __ ------------ ------------ ------------ ----------
67,870.72 .......... ..
Equipment Operators_------------ ------------ ------------ ---------Shop Employee's
45,318.16 .......... ..
Field ............. ------------ ........................ ----------
11,934.24
Sign Employee's .................................................................. ------------
Other Skilled Labor.................................................
63,071.44 .......... ..
Common Labor.................................................... 127,092.20 ........... .
1,236.84 ------------ ------------ -----------57,829.63 ------------ ------------ ------------
25,554.61 ------------ ------------ -----------6,388.92 ------------ ------------ -----------12,337.90 ------------ ------------ -----------313,126.22 ------------ ------------ ------------
69,107.56 103,147.79
37,488.85 6,388. 92 75,409.34 440,218.42
Quarry
Direct Quarry........ ------------------------ ------------ $1,043.50 -------------- ------------ -------------- ------------ ............ -----------Enfor>"e. of Revenue Laws ........................ $ 20,209.54 .......... -------------- ------------ -------------- ------------ ------------ -----------Professional Fees......... $ 420.32 .................................. -------------- $ 2,597.00 -------------- ------------ ------------ ------------
160.29~ TOTALS ................ $232,978.86 $ 18,225 57 $ 20,209.54 $1,043 501 $ 643,
$ 49,016.87 $ 607,017.22 $ 63,503.86 ------------ ------------
1,043.50 20,209.54 3,017.32
$1,635,155.81
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 11-Cont'd.
OBJECT OF EXPENDITURE
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
-------------- --------,----------,----
General Administra-
tion
Research and
Analysis
Collection of
Revenue
Quarry
Construction
Surveys
Maintenance and Recon-
struction
Shop
Land,
Buildings
and
Legislative
Equipment 1 Transfers
Total Expenditures
EQUIPMENT EXPENSES
Automobile Maintenance
Tires and Tubes ___________ _
I ____ _
482.63
116.80
301.68
2. 64 ------------ ------------
903.75
Accessories, Parts
and Repairs________ ------------ $ Greasing, \'lashing,
10.87 ------------ ----------
1,818.32
514.12
74.95
5. 70 ------------ ------------
2,423.96
Storage, etc ________ ------------ ------------ __ _
180.19
44.80
34.84
. 25 ------------ ------------
260.08
Road Equipment
Expenses Gas and OiL_ _______ _
Tires and Tubes _____ _
146.35 29.14
:::::::::: 2!~ :~~::::::::::::
126,335.49 15' 486.14
16.66 42.37
205,651.83 8,141.55
123.13 ------------ -----------18 35 ------------ ------------
332,491.86 23,749.79
Accessories, Parts
and Repairs________
164.57
Miscellaneous Charges------------
500.67 ------------ ---------.85 ------
151,378.95 561.68
53.41 4.88
200,453.73
84.66 ------------ ------------
1,228.80 ------------ ------------ ------------
352,635.99 1 '796. 21
Repairs to Office
EquipmenL------Repairs to Engineering
987.53
45.00 ------------ ----------
33.50 ------------
89.05 ------------ ------------ ------------
1,155.08
Equipment ________ ----------------------------------------------
1,017 13
128.81 -------------- ------------ ------------ ------------
1,145.94
Repairs to Machinery
Equipment_ _______ -----------Repairs and Upkeep,
289.44 ------------ $ 13.61
99.56 ------------ -------------- 5, 794.70 ------------ ------------
6,197.31
Land and Buildings
764. 80
.55------------ ----------
54.88 ------------
1,339.38 ------------ ------------ ------------
2, !59 .61
Transportation of
3 3 T:::::~~~--~~~~~~~
_-~-----~ -~--~--;
-,--1-,1-::
::
-::-:-:-::-:-:-::-:-:
_-~-
-
_-. :-~--6--:
-,--30-:-~~35-2-:-:1--,---_-_-_~--~-:~-~-~
_- 3 41
59 01
--41_7_.-- :-.--:-- -,-:-_- -:-.--:- _--_--_--_--_--_-_--:-_--_-_--_--fl
-
-
-
-
-
-
-
-
~-
-
_-
_-
_-
/-,-,--:-~-:9-3-_~4-8
34 5
62 3
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 1\-Cont'd.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
1----1------------------,----1----------
OBJECT OF
Land,
EXPENDITURE
General
Research Collection
Maintenance
Buildings
Administra-
and
of
Quarry Construction
Surveys
and Recon-
Shop
and
Legislative
Total
tion
Analysis
Revenue
struction
Equipment Transfers Expenditures
--------------l-----l-------l-----1--------------------- -------
EQUIPMENT
PURCHASES
Trucks ________________ ------------------------------------------------------------------------------------
5,066.80 ___________ _
5,066.80
Road Machinery, Misc.. --------------------------------- __________ ----------------------- -------------- ____________ 9,070.03 ___ _
9,070 03
Office Equipment_ ______ ------------ ---------- ------------ --------- ------------- ----------- ------------ ------------ 1, 775.77 ___________ _
1, 775.77
Engineering Equipment_ ---------- ---------- ---------- --------- -------------- ----------- ------------ ------------ 2,040.12 ------------
2,040.12
Shop Equipment _______ ------------ ------------ ------------ __________ -------------- ------------ ------------- ------------
592.29 ------------
592.29
~:~~~~~:~~:::::::::::: ~:::::::::: :::::::::::: ::::::::::~ :::::::::: ::::::~:::::: :::::::::::: ::::::::::::::1:::::::::::: ~----;;ii-iiii ~~~~~~ 150.00
I TOTALS ____________ -------------------------------------------------------------------------------------------------- $ 18,695.01 ____________ $ 1----1-------------------------------------
COMMUNICATION SERVICES
Telephone and Telegraph $ 8,313.02 $
8.39
22 56 $
40
1,256.60 $ 19.42 $ 4,515.50 $ 884.20 ------------ ------------
Postage _________________7_,_22_1_.3_2 _--_-_-_--__-_--_-____ _ _ _16_2_3_91_$_______ __ $ 1, 745.39
43.56
2,654.87
91.49 ____________ ------------
TOTALS ____________ $ 15,534.34 $
1
8 39
184 95
40 3,001.99 -$-~;-;~--;--7,170.37~~1 ~;;;~~~~~=~==
18,695.01
15,020.09 11,919.02 26,939.11
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Schedule No, 11-Cont'd.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF
Land,
EXPENDITURE
General
Research Collection
Maintenance
Buildings
Administra-
and
of
Quarry Construction Surveys and Recon-
Shop
and
Legislative
Total
tion
Analysis
Revenue
struction
Equipment Transfers Expenditures
------------------- ------ --------- -------1----- ----- ---- ---- -----
HEAT, LIGHTS, POWER,
WATER AND CLEANING
SERVICES
Furnishing of Heat
825.66
6.46 ------------ ---------- -------------- ------------
8.85 ---
840.97
Furnishing of Lights. __ _ 1,731.67
861.43---------------------- $ 1,812.18------------
412.47 $ 141.72 ------------ ------------
4,95947
Furnishing of Power ___ _
37.91
3545 ------------ ----------
8.16 ------------
52.90 1,346.57 ----------- ------------
1,480.99
Furnishing of Cleaning __
360.00 ------------ ------------ ---------- ---- --------- ------------
12.00 ------------ -----------
372.00
Furnishing of \Vater-~--
637.09 ------------ ------------ ----------
1,246.36 ------------
490.74
212.15 ------------ ------------
2,586.34
1--------------------------1-----1-----------1-------1----- 1-------
TOTALS ___________ _ 3,592.33 $ 903.34 ------------ ----------
3,066.70------------
976.96 1,700.44------------------------
10,239.77
1---------------------------------------------- ----
RENTS
Rents, Road Machinery _____________ ------------------------ _________ _
62,090 90 ---
206.22 ------------ ------------ ------------
Rents, Buildings and Grounds ____________ _
Rents, Office Equipment Rents, Engineering
577.50------------ ------------ ----------
2,343.95 $ 11.10
3,997.64 $ 50.00 ------------ ------------
3,006.50 ------------ ------------ ---------- -------------- ------------ -------------- ----
62,297.12
6,980.19 3,006.50
Equipment_ __________ --------------------------------------------------------------------------------------------------------------------------
Rents, Miscellaneous....
15.00------------ ------------ ----------
78.85 ------------
1.00------------ ------------ ------------
l-----l----1----l-------------------------------
TOTALS ___________ _ 3,599.00 ------------ ------------ ----------
64,513.70 $ 11.10 $ 4,204.86 $ 50.00 ------------ ------------
94 85 72,378.66
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF EXPENDITURE
General Admlnistra-
tion
TRAVELING EXPENSES Subsistence___________ _
Transportation Gas and OiL _______ _
Mileage Allowance ___ _
Other Transportation_
4,684.65
114.85 16,208.87
296.41
Research and
Analysis
Collection of
Revenue
Quarry
Land,
Maintenance
Buildings
Construction Surveys and Recon-
Shop
and
Legislative
Total
struction
Equipment Transfers Expenditures
- - - - ~--~~-i-~~~-1-~--~- -----1-~~-1~~~-
477.22 $ 3,229.10 $ 10.50
2,247.73
2144
5,833.18
498.80-
17,002.62
230.17 ------------ ----------
2,00104 15,347.85
36.40
35.55
16.70----------
4,266.37 62,979.08
593.84
1,505.12 5,029.96
46.13
1,078.90
8 95 ------------ ------------
14,659.03 1,143.20------------ ------------
7.90 ------------ ------------ ------------
7' 204.36 117,405.43
996.53
TOTALS__________ $ 21,304.78 2,743.98 $ 18,593.65 $ 46 90
70,087.02 6,602.65
s 21,579.01 1,650.95 ------------ ------------ $ 142,608.94
- - - - - ----~-1~~~-1~~~-1-~~-1-~~~~-1-~~~-1-~~--- ----~~-1-~~-1~---
SUPPLIES AND
MATERIALS Office Supplies ________ _
Drafting and Engineering
9,776.00
s 526.73
32.00 ----------
1,082.85
160
1,863.50 $ 284.31 ------------ ------------
13,566.99
Supplies......... ___ . Photographic Supplies.. Cleaning and Toilet
Supplies.. ___ __ . ___
Laboratory Supplies
4,515.71
13.20----------------------
14,407.79 2,269.60
19.46------------------------ ------------
39.62 ------------ ------------ ---------- -------------- ------------ -------------- ------------ ------------ ------------
1,994.32
52.71 ------------ ----------
2,941.00 ------------
35.36
20.80 ------------ ------------
21,225.76 39.62
5,044.19
and Materials ________ -----------Forage and Supplies
1,503.27------------ ---------- -------------- ------------ -------------- ------------ ------------ ------------
1,503.27
for Animals.......... ----------------------------------------------
78,768.55------------ -------------- ------------ ------------ ------------
78,768.55
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 11-Cont'd.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF
Land,
EXPENDITURE
General Research Collection
Maintenance
Buildings
Administra-
and
of
Quarry Construction Surveys and Recon-
Shop
and
Legislative
Total
tion
Analysis Revenue
struction
Equipment Transfers Expenditures
--------]-----]---- -----------------------]---- -----]---- ]-----
SUPPLIES AND
MATERIALS-
Continued
00
0 Food Supplies__________ ----------------------------------------------
Wearing AppareL ______ ---------------------------------------------Medical Supplies _______ S 12.77----------------------------------
Camp Supplies, Misc. ___ ------------ ____________ ------------ ----------
Tools_---------------------------- ____________ ------------ ----------
Fuel Supplies__________
640.75 $
.97----------------------
Explosives _____________ ------------ ------------ ------------ ----------
95,358.48------------ -------------- ------------ ------------ ------------
18,697.78------------ -------------- ------------ ------------ ------------
2,460.21 ------------ -------------- ------------ ------------ ------------
5,134.18 $ 220.84 $
14.00------------ ------------ ------------
7,463.98------------
3,733 21 $ 972.6ti ------------------------
5,308.03------------
2,629.57 1,048.79------------ ------------
12,284.56 ------------
61.80 --
------------ ------------
95,358.48 18,697.78 2,472.98 5,369.02 12,169.85 9,628.11 12,346.36
Building Supplies and
Materials ____________ ------------ ------------ ------------ _________ _
Signs------------------ ------------ ------------ ------------ ---------Materials-Roads
2,227.81 -----------45.87 ------------
5.83 ------------ 7,843.31 ------------ ------------ ------------
2,233.64 7,889.18
and Bridges-------------------------------------------------------- 511,557.94 ------------
82,436.90------------ ____________ ------------
Materials-Shop ________ ---------------------------------------------- -------------- ------------ -------------- 155,713.06 ------------ ------------
593,994.84 155,713.06
General Supplies-
Roads and Bridges. ----------------------------------------------
22,948.52 ------------
5,619.02 .:=_:_:_:.:.:_:_:_:_:.:_:.:_:.:.:_:_:_:_:.:_:;.:_:.:_:.:_:.:_.:_:.:_: --2~567 54
TOTALS__________ $ 16,979.17 $ 2,096.88 S 32.00 ---------- 780,687.55 $ 2,492 04 104,261.96 $158,039.62------------ ------------ $1,064,589.22
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
llebldiM No. \1-cont'd.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
-------------- ---1-----------1-----,----1
OBJECT OF
Land,
EXPENDITURE
General Research Collection
Maintenance
Buildings
Administra-
and
of
Quarry Construction Surveys and Recon-
Shop
and
Legislative
tion
Analysis Revenue
struction
Equipment Transfers
---------1-----1--------------------------------1------1-----1------
INSURANCE
I
Fire lnsurance-Build-
Li~~~~t:~;~~~t~~c~~-----
------------
-----------r
---------
----------
------
-------
------------
58.40 ------------ ------------ ------------
Total Expenditures
58.40
Equipment __________ $ 326.04------------,------------ __________
2,720.47.
12' 251.30
324.30 ------------ ------------
15,622.11
Bond Premiums________ 3,240.73 $ 27.00:____________ __________
603.00 ___ _
974.73
21.00 ------------ ------------
4' 866.46
1----1------------------.- --------- ----1----1------
TOTALS ___________ _ 3,566.77
27.00 ------------ ---------
3,323.47. ---------- $ 13 '284 .43
345 30 ---------
20,546.97
-------------------------------- ----1------- ---- - - - -
PRINTING, BINDING,
PUBLICITY, ETC. Printing Maps ________ _
Stenography, Typewrit-
770.03 ------------ ------------ ---------- -------------- ------------ -------------- ------------ ------------ ------------ $
770.03
ing and Multigraphing, Job Work _______ _
Photo Printing and Developing Job Work __ _
Publication of Notices and Advertising _____ _
39.00 ------------ ------------ ---------- -------------- $ 261.61 -------------- ------------ ------------ ------------
171.40 ------------ ------------ ----------
12.45 ------------ $
45.31 $
5.35 ------------ ------------
4,853.43 ------------ ------------.---------- -------------- ------------ -------------- ----
300.61 234.51 4,853.43
------------1----------1 TOTALS_._______ _ 5,833.86------------
$
12.45 $ 261.61 $
45.31 $
5.35 ------------ ------------
6,158.58
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 11-Cont'd
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF
Land,
EXPENDITURE
General
Research Collection
Maintenance
Buildings
Administra-
and
of
Quarry Construction Surveys and Recon-
Shop
and
Legislative
Total
lion
Analysis
Revenue
struction
Equipment Transfers Expenditures
--------------l-----l-----l------------------1---------------- ----
INDEMNITIES
Compensation-Medical
Services Claims and
Costs _______________ $ 10,871.48 ____________ ------------ __________ -------------- ------------ -------------- ________________________ ------------
10,871.48
Damage to Private
Property ______ ------ 8,207.06 ------------ ------------ ---------- -------------- ------------ -------------- ------------ ------------ -----------
8,207.06
Damage for Personal
Services ____________ _ 2,533.60 ------------ ------------ ---------- -------------- ------------ -------------- ------------ ------------ ------------
2,533.60
-----1----1------ ----1----------------------1---- -----
TOTALS __________ $ 21,612.14 ------------ ------------ __________ -------------- ------------ -------------- ________________________ ------------
21,612.14
l----l----l----1----l-----l----l-----l----1------ ----- ----
PAYMENTS TO
CONTRACTORS
Payments to Contractors------------------------------------ __________ $9,470,838.02 $ 700.00 ----
$9,471,538.02
------------1-----1------------11----1----- --------------- ----
SPECIAL AND
MISCELLANEOUS
EXPENSES
Miscellaneous Camp
~:~~~;~~~~:~~~::~~~~: :~::::~~~:~~ :i::;:;~i:;~ ~~~=~~=~~-~= ==:~~~~~-~~~~~~~~;;;;~~~~~-:_:_8:~-:~_fJ_:~_:_:_:_:_:_:_:;_:; :,:::::;L~~~~~~~~~:~:r~~~-~~~~0:,
3,444.54 88,342.87 33,336.74
552.30
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
............ ..,,~
OBJECT OF EXPENDITURE
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
------~-----~-----~----[------,------ ---------~
Land,
General
Research Collection
Maintenance
Buildings
Administra-
and
of
Quarry Construction Surveys and Recon-
Shop
and
Legislative
tion
Analysis
Revenue
struction
Equipment Transfers
- - - - - , - - - - - - I - - - - --~----
-----~--
- - - - - - - - - - - - - ~-----
-----~
Total Expenditures
SPECIAL AND
00
MISCELLANEOUS
"" EXPENSES-Cont'd. Incidentals ____________ _
641.48 $
.80------------ $ 52.69 $
259.93
50.00 $
80.50
7.20 ------------ ------------
1' 001.60
Interest _______________ ------------ ------------ __ ---------- ---------- -------
Transfers
Convict Farm ________ ------------ ___________ ------------ ---------- -------------- ------------ _ ---------- ___________ ------------
546.93
546.93
~:~~~~:"-' ,,;:~ ,:=::: ,~~::60,059.69
~~:~:: 7,;~~,~~-i;,;;ch;,~; =~:~~-~: ~--::::-.--:_::r~,-::-__-:r:-::::::- : _:_: :---: 8;:;~~-~~ ::::::::::::: ~::::::::-:: ::::::~::::,:::::::::::: ~-8-~_:~-~-~--~-;
TOTALS ____________ $ 1,880.78 $ 1,958.201! ____________ $ 52.69 $ 37,568.29 $179,861 88 $
184 h5 $ 37 65 _ _______ ,$2,060,606.62 $2,282,150.84
- - - -----~-
- - - - - -~----
----~~
-----------
I
-~-,-~--~,---
- - - - - - - I -~----
TOTALR ___________ $328,974 42 $ 27,074.82 $ 39,020 14 $ 1,157 10 $11,380,060 33$ 239,930 98 $ 1,176,073.22 $ 233,9334? !8,695.01 1$2,060,606.62 $15,505,526.13
1
1
1
1
1
1
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 11.-Cont'd
OBJECT OF EXPENDITURE
_____ ____ _______ ADMINISTRATION
------
,
,
CONSTRUCTION
MAINTENANCE
- - - - - - ~---~- -~--- --~~-
General Administra-
tion
Research and
Analysis
Collection of
Revenue
Quarry
Construction
Surveys
Maintenance and
Reconstruction
Shop
Land, Buildings and Equipment
Legislative Transfers
Total Expenditures
LESS: INTER-DEPART-
MENTAL BILLINGS
Blue Prints
G. 0. Salaries. _______ $ 77,388.57------------ ------------ ---------- -------------------------- -------------------------- ------------ ------------
~~::::. ~. t : : : -. :"'" ="- - - : G. 0. Supplies_______ 11,876.77 ------------ ------------ ----------~-------------- ------------ -------------- ------------ ------------ ------------
Shop
- - - -3 "" .,,
:
77,388.57 11,876.77
:::: :
"':;::::,~;,;;1~~~::~~.~~~~~~~"-"~1~~1~'"-~:~~~::.~g:~
Schedule No.12.
STATE HIGHWAY BOARD OF GEORGIA
OONSTRUCTION ALLOTMENTS AND EXPENDITURES BY TYPES JULY 1, 1934 TO JUNE 30, 1935
-
Description
July 1,1934 To
Dec. 31, 1934
Jan.1,1935 To
June 30,1935
Total For Year
ALLOTMENTS
Graded Earth and I
I
SoiL ______ -- _- --- - - $ 771 ,290. 27 $ 571,485.53 $ 1,342,775.80
GraveL _________ - __ -- 1, 207,233.68 1,146,236.85
2,353,470.53
Macadam ____ -_--_--- 122,339.34
94,840.99
217' 180.33
surface Treatment__ 1,269,543.21 1,220,577.13
2,490,120.34
Bituminous Mixtures 210,896.88
4,375.13
215,272.01
Bituminous Concrete 90,600.28
324,176.11
414,776.39
cement Concrete ____ 1,130,162.20 Brick ___________ - ___ - 43, 687. 22
1,265,402.04
2,395,564.24
990.50Cr.
42,696.72
Structures__________ - 1, 099, 193. 68
729,864.09
1,829,057.77
--------
Totals _____ - - -- - - $5,944,946.76 $5,355,967.37 $11,300,914.13
I
EXPENDITURES
Graded Earth and SoiL _______________ $ 900,462.36
GraveL ______________ 1,043,388.99 Macadam ____________ 105,464.05 Surface Treatment__ 2,071,058.11 Bituminous Mixtures 331,250.00 Bituminous Concrete 167,750.73 Cement Concrete ____ 1,357,285.27 Brick ________________ 18,191.34 Structures___________ 289,863.66
Totals ___________ $6,284,714.51
$ 960,577.21 1'024, 393.46 53,494.79 1,303,632.04 72,868.72 103,926.01 1,117,599.98 37,734.32 421,119.29
$5,095,345.82
$ 1,861,039.57 2,067,782.45 158,958.84 3,374,690.15 404,118.72 271,676.74 2,474,885.25 55,925.66 710,982.95
1$11,380,060.33
85
STATE HIGHWAY BOARD~OF GEORGIA CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 13
DESCRIPTION
Personal Services
Equipment Expenses
Communi- Furnishing cation Heat, Light, Services Power and Water
Rents
Traveling Expenses
EXPENDITURES
Supplies and
Materials
Insurance
Printing, Binding, Publicity
Etc.
Payments to
Contractors
Special and Miscellaneous Expenses
Total
SUPERVISION
CONTRACTS State Aid. ________ _ Federal Aid _______ _ National Recovery_
TOTALS _______ _
78,579.64 3,464.65 215,647.54
297,691.83
845.46 240.42 2,593.81
229.32 ---
6.48 ----------
860.88 ----------
3,679.69 $1 '096. 68 ----------
145.50 $ 19,427.33
10.00
592 37
163.89 37,813.44
3,586.66 ---------- ---------- ------------ $ 7,879.33
93.60 ---------- ---------- ------------
121.50
9,307.36 ---------- ---------- ------------ 20,056.24
---
319 39 $57,833.14 $ 12,987.62 --
---------- ------------ $ 28,057.07
110,693.24 4,529.02
286,443.16
401' 665.42
STATE FORCES Convict Forces ____ _
17,835.58
223.95
1~ 04 ----------
5.00 3, 998.94 546.20 s 3 oo~-$--9-I~~~~=~---=:--::;:
Asphalt Forces____ _
4,792.99
3.56
16.98 ----------
5 00 1,930.63
160.26
15 00
----------- 1,060 40
7,984.82
Paving Forces _____ _
5,424.82
1.50
8. 70 ----------
29 15
833.35
310.61 ---------- ---------- ------------
821.11
7,429.24
Division Forces_. __
2,128.31
42.95
9.29 ---------- ------------
648.03
82.32 ---------- ---------- ------------
257 94
3,168.84
1~----l------------------------------------l---------
TOTALS _______ _
30,181.70
271.96 ~=== s 39.15 s 7,410.95 s 1,099.39 s 18.oo_s_~~------------ 3,251.60
42,335.91
Total Supervision
327,873.53
3,95L65 $1,150 69 ~~~:..:.:..:.~~~= 35~~_s_ 65,244 09 $ 1~087 01~~~_18 00;~ 9 15;=-~~c-=--=-=--=-=--=-J=$=3=1,=3=08=.=67J==4=44=,0=0=1=.33
1
1
STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT
JULY 1, 1934 TO JUNE 30, 1935
Sol\edule tto. \3-Cont'll.
DESCRIPTION
Personal Services
Equipment Expenses
Communi- Furnishing cation Heat,Light, Services Power and Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing, Binding, Publicity,
Etc.
Payments to
Contractors
Special and Miscel laneous Expenses
Total
DIRECT
CONTRACTS
State Aid
Contractors ............................... ---------- __________ ----------- ---------- ---------- ---------- --------- $1,417,330.69 ----------- 51,417,330.69
Counties _________ ---------------------------------------------------------------------------_
______________ 1,605,003.96 ------------ 1,605,003.96
Federal Aid........ ----------------------------------- ---------- -------- ------------ ------------ -------- __________ 41!,609.42 ------------
42,609.42
National Recovery_ $ 23,819.24 $ 1,999.47 $ 30.82 $ 46.03 $ 8,544.71 $ 574.30 $ 9,916.96 $ 57.00 ---------- 6,405,893.95 $ 121.95 6,451,004.43
1-----1-----1---------------------------------- ----- -----
TOTALS ______ __
23,819.24 1,999.47
30.82 $ 46 031 s 8,544.71 $ 574.30 $ 9,916.96 $ 57 00 -------- $9,470,838.02 $ 121.95 $9,515,948.50
-----------------------------1-----1------ ----
STATE FORCES
Convict Forces.____ Asphalt Forces_____
113,462.02 $172,953.70 $1,573.651 $2,891.76
87,084.48 63,019.50 169 13
92.06
734 90 645 83
1,580.08 $354,635.88 $1,992.42 __________ ________ 2,160.05 170,437.16 1,256.05 __________ ------------
5,951.15 22.53
655,775 56 324,886.79
Paving Forces......
43,332.03 24,394.44
77.70
2 05 53,959.69
448.50 174,865.70 ____________________ ---------
78.55 297,158.66
Division Forces.. __ _ _4_7_._58_8_.9_9 __3_7_,4_8_20_9. _._.___________3_4_._80 ___2_7o_._o3_ _ _ _8_o_.o_o_ __5_6_.7_4_4_8._41 ________ .. $ 3. 30 .:_:_:_:==-:_: _ _ _85_._44_ __1_4_2_2,_89_._4_9
1
1
1
1
1
1
TOTALS________ 291,467.52 $297,849.73 $1,820.48 $3,020.67 $55,610.45 4,268.63 $756,683.58 $3,248.47 $ 3.30 ____________ 6,137.67 $1,420,110.50
1-----1-----------------------1---------------------1------
Total Direct_._. __ . __ 315,286.76 $299,849.20: $1,851.30 $3,066.70 $ 64,155.161 $ 4,842.93 $766,600 54! $3,305.47 $ 3 30,$9,470,838.02 $ 6,259.62$10,936,059.00
Total Expenditures_.. 643,160 29~~~~ S3 .oo1.9=[~:~o~-~ -~ 64,~~~~~=;o~~:~ ~~o~~~~~-~3~~~~~ ; -~;=:ls9,470,838.o; ; ~~~~;g~~~;;~o;o=~
STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT
JULY 1, 1934 TO JUNE 30, 1935
Schedule No. 13-Cont'd.
ALLOTMENTS
New
Contracts
Revisions
Total
---------------1--------1-----------------
Contracts
State Aid
Contractors ___________ $ 1,455,402.94 $ 96,289.90Cr. $ 1,359,113.04
00
Counties __ ------------ 2,031,885.59 179, 149. 82Cr. 1,852, 735.77
00
Federal Aid _____ --------
87,156.94
29,539.5!Cr.
57,617.4:3
Nat'! Recovery---------- 6,488,852.13 107, 103. 67Cr. 6,381,748 46
---------------1------
Totals ______________ $ 10,063,297.60 $ 412,082.90Cr. $ 9,651,214.70
ALLOTMENTS
New Contracts
Revisions
Total
State Forces Convict Forces ___________ $
Asphalt Forces __________ _ Paving Forces __________ _ Division Forces ________ _
547,946.88 $ 242,150.96 $
389' 884.97
56,531.37
331,084.66
26,496. 76Cr.
95,878.70
12,718.65
790,097.84 446,416.34 304,587.90 108,597.35
-------------1------
Totals ______________ $ 1,364,795.21 $ 284,904.22 $ 1,649,699.43
====,==!===== ------
TotaL\llotments _________ $ 11,428,092.811$ 127,178.68Cr.l$ 11,300,914.13
Schedule No. 14 STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS
BY COMMISSIONERS DISTRICTS JUNE 30, 1935
District
Amount
CONSTRUCTION Beginning of Department to June 30, 1933
District No.1, Southern ......... ------ --- $45,099,763.46
2, Central_ _________ _
- ............... .. 39,788' 179.25
3, Northern .................. . --- ----- 43,408,665.46
TotaL .............
----- $128,296,608.17
CONSTRUCTION Beginning of Department to June 30, 1935 District ~o. I, Southern ... ---------- $ 51,363,832.46 2, CentraL ......................................................... . 48' 104' 623.46 3, Northern _________________________________________________________ _ 5!,441,875.74
TotaL ......................... __ -- ............. _- ................. $150,910,331.66
CONSTRUCTION July 1, 1933 to June 30, 1935
District No.1, Southern ... ----- 2, CentraL ......................................................... 3, Northern ..........................................................
6,264,069.00 8,316,444.21 8,033,210.28
TotaL ............................................................ $ 22,613,723.49
CONSTRUCTION July 1,1934 to June 30, 1935 CONSTRUCTION-REGULAR District No.1, Southern .......................................................... $ 1,558,550.87 2, CentraL.......................................................... 1, 996,858.80 3, Northern.......................................................... 1,363,756.00
TotaL .............................................................. I 4,919,165.67
CONSTRUCTION-NATIONAL RECOVERY
District No. 1, Southern ______________ -------------------------------------------2, CentraL ......................................................... . 3, Northern ...................... .
1, 738,042.34 1,648,227.57 2,995,478.55
TotaL- - $ 6,381. 748.46
CONSTRUCTION-TOTAL District No.!, Southern ...................................................... $ 3,296,593.21
2, CentraL ..... ---------------------_____ 3,645,086.37 3, Northern ..... --------------------------------------------....... 4,359,234.55
TotaL.---------------- .. -------------- ..... --------- ...... $ 11,300,914.13
89
Schedule No. 15 STATE HIGHWAY BOARD OF GEORGIA
SUMMARY~~ ~g~~'itLE~S~~~'i~ug~~l~~lT~LOTMENTS,
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS 1 JUNE 30,1935
District
I
Distr. of Totalt
of Allotments:
I On Mileage ,
1 Basis
I
------
Funds as Actually Allotted
I,Excess Allot.I,Allot. under
Over
Mil-
1
1
Mileage
eage Basis Basis Dis-
Distr.
tribution
CONSTRUCTION
Beginning of Department to June 30,1933
I
I
I
District No.1 10,871 '306. 71 1$ 10,892,038.56$ 20,731.851 -
-
2 10, 742,890.83,' 11' 146,744.961 403.854.131.---
--
3 11,046,651.48, 7,935,376.54.- - -- -$3,111,274.94
4 9,309 ,850. 36 9,964,556.45 654,706.09 -----
5 2,334,163.3'3) 2,544,008.54 209,845.16------- ---
6 9,998,505.621 8,786,047.16---------- -- 1,212,458.46
7 10,153,010.86, 11,403,607.38 1,250,596.52.---
8 11 '358' 051.59 9 '000' 583.50 -- -- ---. 2' 357 '468. 09
9 13,510,537.71 17,887,880.501 4,377,342. 79-------- ----
10 9,824,491.57 8,626,887. 711_-.----- --.11,197,603.86
11 16,454,516.59 18,925,685.12 2,471,168.53... -- ----- ----
12 12,692,631.471 11,183,191.75---- ----- -- 1 ,509,439. 72
+------ 1-- - - - - - ------ --~----------
----~--------
Totals __ l$128,296,608.17j$128,296, 608.171_-- ------
CONSTRUCTION Beginning of Department to June 30,1935
District No.1
2
3 4 5 6
7 8 9 10 ll 12
12,721,304.82,I$ 12,674,163.77--- - -- - ---_I$ 47,141.05
12' 798,879.871 12' 387' 906.15
_I 410, 973. 72
12,881,320.02[ 9,370,042.01-
- -1 3,511,278.01
10,870,926.96, 11,594,389.88$ 723,462.921 ______ -- -
2' 790' 958.171 3, 636' 306.521 845' 348. 351_ -----------11,698,616.88, 11,413,283.04-- - - ----- 285,333.84
ll '871, 700.651 13' 692' 342.241 1, 820' 641.59 -------- --13,388,529.20 11,229,525.62, ..... -------- 2,159,003.58
16,006,384.19 19,952,125.781 3,945,741.59---- -- ----
11,546,326.791 9,797,580.45 ---- --- 1,748,746.34
19,378,268.32 21,102,233.10 1,723,964.78-------
14,957' 115.79 14,060,433.10------------- 896,682.69
90
Schedule No.15-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS, BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30,1936
District
Distr. of Total of Allotments
On Mileage
Basis
Funds as Actually Allotted
!Excess Allot.IAllot. under
1 Over Mil- Mileage
eage Basis Basis Dis-
Distr.
tribution
I
CONSTRUCTION
July 1, 1933 to June 30,1935
District No.1 $ 2 3 4
5 6
7 8 9
10 11 12
I
1,849,998.111$ 2,055,989.04 1,834,668.54 1,561,076.60
456,794.79 1, 700,111.26 1,718,689.79 2,030,477.61 2,495,846.48 1,721,835.22 2,923, 751.73 2,264,484.32
11,'274812,'116215.1.291, _1_-_-_-_-_--_-_-_-_-_-_-__I$
67,872.90 814,827.85
1,434,665.47 ------------- 400,003.07
1,629,833.43$ 68,756.83 -------------
1,092,297.98 635,503.19 -------------
2,627,235.88 2,288,734.86 2,228,942.12
927,124.62 -------------
570,045.07 ------------198,464.51 -------------
2,064,245.28 ------------- 431,601.20
1,170,692.74 ------------- 551,142.48
2,176,547.98 ------------- 747,203.75
2,877,241.35 612,757.03 -------------
Totals____ $ 22,613,723.49 $ 22,613,723.49 ------------- -------------
91
Schedule No.l6
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL
DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1935
District
1 Distr. of Total of Allotments
On Mileage
Basis
Funds as Actually Allotted
!Excess Allot. IAllot. under
Over Mil- Mileage
I eage Basis Basis Dis-
Distr.
tribution
I
CONSTRUCTION-REGULAR
July 1,1934 to June 30,1936
District No.1 $ 2 3 4 5 6 7 8 9 10 11 12
Totals ___ $
I
409,490.44 1$ 444,051.11 392,760.08 338,781.41 103,197.83 374,654.59 371,842.64 438,456.23 539,765.70 375,570.70 638,003.06 492,591.88
4, 919' 165.671$
I
I
494,771.47 212,245.22
$----8-5--,2-8-1--.0-3-$---2--3-1-,8--0-5-.8--9
295,016.57 ------------- 97,743.51
453,941.93 115,160.52 -------------
62,187.91 ------------- 41,009.92
506,063.24 359,801.30
131,408.65 -------------
-------------
12,041.34
463,590.15 25,133.92 -------------
441,329.92 ------------- 98,435.78
159,557.54 ------------- 216,013.16
648,002.73 9,999.67 ------------822,657.69 330,065.81 -------------
4,919,165.67 ------------- -------------
I
I
CONSTRUCTION-NATIONAL RECOVERY July 1,1934 to June 30,1936
District No.1 $ 2 3 4 5 6 7 8 9 lO ll
12
523,813.031$ 577,995.79 511,429.63 441,352.93 133,346.94 485,179.74 482,515.14 571,062.59 697,210.50 488,058.81 828,686.28 641,097.08
290,540.29 -------------$ 233,272.74 385,865.68 ------------- 192,130.11 451,439.51 ------------- 59,990.12 388,455.94 ------------- 52,896.99
782,112.26$ 648,765.32 -------------
509,394.75 24,215.01 ------------862,870.74 380,355.60 ------------328,988.59 ------------- 242,074.00 818,183.69 120,973.19 -------------
282,411.47 ------------- 205,647.34
625,999.03 ------------- 202,687.25 655,486.51 14,389.43 -------------
Totals ___ $ 6,381, 748.46$ 6,381,748.46 ------------- -------------
I
I
I
92
Schedule No.16-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL ALLOTMENTS, BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30,1935
-
District
Distr. of Total
of Allotments On Mileage Basis
Funds as Actually
Allotted
Excess Allot. Allot. under
Over Mil- Mileage
eage Basis Basis Dis-
Distr.
tribution
CONSTRUCTION-TOTAL
July 1,1934 to June 30,1935
District No.1 $ 2 3 4
5 6 7 8 9 10
11
12
933,303.47~$
1' 022' 046.90 904, 189.711 780,134.34
236' 544. 771 859' 834. 33j 854,357.781 1,009,518.821 1,236,976.201: 863,629.51
1,466,689.341
1' 133,688.961
785,311.761-------------$ 147,991.71 598' 110.90 ------------- 423,936.00 746,456.081------------- 157' 733.63 842' 397.87 $ 62,263.53 -------------
844' 300 .171 607' 755 .40 ------ ---- --1 '015, 457.99, 155' 623.66 ------------1,222,672.04: 368,314.26-------------
792,578.741_____________ 216,940.08 1,259,513.611 22,537.41 ____________ _
441,969.01_____________ 421,660.50
1,274,001.76[------------- 192,687.58
1' 478,144.201 344,455.24 -------------
Totals ___ .$ 11,300,914.d$ 11,300,914.131------------- ____________ _
1
' .
'
.
MAINTENANCE July 1,1934 to June 30,1935
DistrictNo.1 $ 2 3 4 5 6 7 8 9 10 11
12 -
Totals ___ $
9 6 , 3 9 6 . 1 0 1$ 105,559.451 93,386.82 80,574.04 24,431.15 88,806.37 88,240.49 104,265.42 127,759.20, 89,197.92 151,483.62: 117,090~:
1,167,190.71 1$
91,575.081-------------$ 4,821.02
98,454.33,-------------
7,105.12
95,471.37$ 2,084.55-------------
72,073.00-------------
8,501.04
18,371.99 -------------
6,059.16
87. 869 .17 - -- - ---- --- - -
937. 20
95. 472 . 45
7. 231.96 -- - ----- -- - --
102,953.87:-------------1 1,311.55
129.275.72: 90,860.1611
1, 516. 521_-----------1,662.24, ____________ _
148,512.01_____________
2,971.61
=== 136,301.561 19,211.43-------------
1,167,190.711-------------
93
Schedule No.16-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL ALLOTMENTS, BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1935
======================7=====================7=======--
District
Distr. of Total of Allotments
On Mileage Basis
Funds as 1 Excess Allot. Allot. under
Actually Over Mil- Mileage
Allotted eage Basis Basis Dis-
Distr.
tribution
RECONSTRUCTION July 1,1934 to June 30,1935
District No.i 1$
I
i
1,827.08$ 3,940.80 i$
1 '948. 201 1 '5.41. 80
2,113.72I ~
~~~~~I$
406.40
3 . 41 5 I
i:!~tg~;~~~~~~~~~~ ~:::~~::~~~~~~~~~~ i:Ht~
6 I
1 '651. 99 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
1'651. 99
7
1,636.35, 5,174.57
3,538.22 ~~~~~~~~~~~~-
8
1,922.49 5,243.40Cr. ~~~~~ ~~~ ~~
7,165.89
9
2,385.95, 7,295.84
4,909.89 ~~~~~ ~~~~---
10
1,650.411 ~~~~~~~~~~~~
~~~~~~~~~
1,650.41
11
2,804.991 l, 7l5.15Cr.' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
4,520.14
12
2,161.45, 10,658.06
8,496.61 ~~~~~~~~~~-~-
Totals~~~$~--2- 1,- 65- 2.5:2 - $ -21-,6- 52- .5- 2 ------~. ~~- 1~~-~~- ~~- ~~~- ~~- --
1
1
SURVEYS July 1,1934 to June 30,1935
District No.1 $ 2 3 4 5 6 7 8 9 10 11 12
Totals~--_ $
I
21 '438 .12i$ 23,280.91 20,592.481 17' 763.071 5,407.221 19,634.231 19,490.14 22,988. 76. 28,281.081 19,687.921 33,443.611 25,825.57
257,833.111$
I
14,940.651~~~~~~~~~~~~~ $ 6,497.47
6,629.54 ~~~~~~~~~~~~-
16,651.37
~i:
~~~:~~I$~--~
4~
483:99
6,255.25 -------------
38,616.96. 33,209.74 - -----------
18,156.191 ~ ~-- ~ ~ ~ ~ ~ ~ ~ ~ ~
1,478.04
32,552.81 13,062.67 -------------
13,607.21 -------------
9,381.55
22,107.74 -------------
6,173.34
13,946.09 -------------
5, 741.83
33,644.11 27,047.52
200.50 -------------
1,221.95 -------------
257,833.11,---- ~- ------ -------------
I
I
94
Schedule No.16-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL ALLOTMENTS, BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30,1935
District
IDistr. of Total of Allotments
On Mileage
I Basis
Funds as Actually Allotted
Excess Allot. Allot. under
Over Mil- Mileage
eage Basis Basis Dis-
Distr.
tribution
TOTAL ALLOTMENTS July 1,1934 to June 30,1935
District No.1 $ 2 3 4
5 6
7 8 9 10 11 12
1,052,964. 77$ 1,152,835.46
1'019' 891.52 879,956.54 266,839.15 969,926.92 963,724.76
1,138,695.49 1,395,402.43 . 974,165.76 1,654,421.56 1,278,766.11
895,768.291- ---- ---- J$ 157,196.48
704,736.57,- --------- 448,098.89
856,264.681 - --- ------ 163,626.84
936,717.931$ 56,761.39------------901,289.12 634,449.97 -------------
1,121,483.35 151,556.43-------------
1,355,871.871 392,147.11 -------------
903,896.42 ----- ------ 234,799.07
1' 418' 192 .91 22' 790 .48 - -- -- - ---- ---
546,775.26 ---
--- 427,390.50
1,454,442.731______ ---- 199,978.83
1,652,151.341 373,385.23-------------
Totals___ $ 12,747,590.47 $ 12,747,590.47, 1 ===='I
Other Allotments Undistributed:
Administration ________________________ $ 241 '774.41
Research ___________________________ .. __
298.39
Collection of Revenue___ . ___________ _ c;tuarry ____________________________ _ Shop. _______________ _
39,020.14 1,187.10 110.75
Equipment________
_ __________ _ 16,343.68
Motor Vehicle License Tags __________ _ 60,059.69
Transfer-General Fund-1935 Act ___ _ 2,000,000.00
Total Allotments, July 1,1934 to June 30, 1935-Exhibit "B"- _________ $15, 106,384.63
95
STATE HIGHWAY BOARD OF GEORGIA
ENGINEERING
STATE MILEAGE BY ENGINEERING DIVISIONS
AT JUNE 30, 1935
Div.No. No.of
I
.
Area IPopulatiOn Mileage at
Counties Sq.Miles 1930 Census 6-30-34
---- ------ ------ ------
l_ ________
2 _________
56 51
3 _________
52
22,916
846,415 3,040.165
19,561
894,135 3,028.877
16,248 __1:_._1:67,9~12,807.176
------
Totals __ 159
58,725 2,908,506 I 8,876.218
I
~
Mileage at 6-30-35
-
3,128.339 3,204.529 2,873.561
-
9,206.429
------=
STATE MILEAGE BY CONGRESSIONAL DISTRICTS AT JUNE 30, 1935
I
-~
~iCsotn.g . _
No.of Counties
Area Sq.Miles
!1P9o30pCuleantisounsM1i~le3a0g-e 3a~t ~ Milea~ ge at
1
l________
13
2________
13
3________
15
4_-------
10
5 ________
4.
6 __ ------
13
7 ________
13
8--------
13
9________
18
10 ________
12
ll_ -- - -- - -
20
12________
15
6,396 5,528
260,291 I 709.409
242,276
808.865
4,563
189,719 . 716.213
3' 777 1,140
220' 708 422,206
618.619 194.100
3, 614 4,366
221,050 262,219
672.584 671.417
4' 193 5,449 4,657
198 '927 218,496 212,934
800.055 951.898 680.954
9 '465 i 248' 290 11 ' 155 . 148
5,577 1 211,39o
896.956
773.427 812.392 743.179
671.766 196.448 702.025 684..073
799.576 995.626 710.079
1 ' 173. 655 944.183
1"9.206.429 Totals__ =~ --58,~5___1--z.g08,5()(li8,876.218
STATE MILEAGE BY COMMISSIONERS DISTRICTS AT JUNE 30, 1935
Comm.l No.of I Area
Dist. Counties Sq.Miles
-----
1_ ________
56
22,916
2_________
51
19,561
3_________
52
16,248
!Population Mileage at 11930 Census 6-30-34
------
846,415 3,040.165 894,135 3,028.877 1,167,956 2,807.176
Mileage at 6-30-35
3,128.339 3,204.529 2,873.561
Totals.. -159 -~--58,72"5"12,908,500i 8,876.218"" 9,206.429
I
I
1
96
Project No. 29- A- DBmanuel County- Concrete Paving Near Swainsboro.
Completed 1936.
Project No. 342- A- Twiggs CountyConcrete Paving North of Jeffersonville. Completed 1935.
STATE HIQ-AY -ARD OP CR.OIIQIA
SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
To~ndSoil ~, I I I Project
Number I
COUNTY
---- -----------
Chattooga ___
--_:] -~-, -~- =---=~ .: : ~-----~L::: -. -~ 17' - 2-A Rabun_______
Eng. I Cong. Div. , Dist.
Comm. Dist.
Graded Earth
Sand Clay
I C::na;el Resurface
Macadam j
Surface Bituminous Treatment Concrete
Cement \ Concrete I
Brick
Structures
17 Wilkes _____
19-B Bleckley ___
19-C Bleckley _ 21-ll Heard ______
-1
12
I
------------
1.515 .686
------- ------
~----------------------- -
29-A Emanuel __
12
""''
29-A Johnson __ 29-D EmanueL_
12 12
30-B Cobb ______
7
31-ll Dade ___ 31-D Dade _________
31-E Dade_
.022
44-A HalL
44-B HalL_
.043
47 Screven ____
.016
49 Mitchell
.022
53-B Bibb__ _____
54 Floyd __
58-A Butts _____
.094
58-A Jasper ___
.Oi2
65 Dade____
71 Catoosa __
-------1 99-A Thomas____ - ----
.008
102 Cobb ____
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
---- ::,!::, .:::.:. """""' ,: .: :~, ;~:;;::- -~-;_cr_en1_~- ::_'"_'_"~ Project I
Number
COUNTY
;:: I Eng. Cony. Comm.
Div. Dist. Dist.
- - B r i : __ _
1
106-A Sumter......... _._._.
- - - - --~=~=: 1==:~
~-::::~ ---1-.4-88- ~---------- _______________________ _
.045
109 Dawson ___________ _
-- ---------- !____________ 6.708
113 Pulaski______________ _
12
___I ___________
.187
116 Walton ____ _
8
2.861
119 Pickens _____________ _
2.139
121-B Randolph __
2.590
.004
135-B Elbert__ _____________ _
.045
..... 138-C Warren
10
.205
0 0
154-A Wayne._. ___________ _
11
1.298
154-ll wayne_
11
1.645
.087
158 Twiggs __
12
4. 737
158-B Twiggs
12
-- -----------
.035
159-A Miller._
.884
171-B Clay __ _
---
5.209
174-B Fulton __ __ 17!!-A Greene __
---
1. 787
::::::::::::1I ::::::::::
-f
I
3.832
182 .Jenkins_
2.885
184 Muscogcc
I
190-ll Murray_
4.521
.323
.023
190-C Murray_
4. 614
195 Mcintosh ____ __
. 1!15
215 Banks __ 221i-B Liberty __
_________ :I -- ----------
3.17:l 0.104 I -- -----
228-A Greene ______________ _
I 233
Clayton _____________ _
j
-:::::::::I::::::::::::I::::::::::::, .430
I
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
Top Soil
Gravel
Project
COUNTY
Eng. Cong. Comm. Graded
and
and
Resurface Surface Bituminous Cement
Brick
Structures
Number
Div. Dist. Dist.
Earth
Sand Clay Macadam
Treatment Concrete Concrete
--~-/-------~ - - - - - - - - 1 - - - - 1 - - - - 1 - - - - - - - - - - - / - - - - - - - - - - - - - - - - - - - - -
234
Camden ______________
11
11.128
236 Jenkins _________
1
241-A Hancock ______________
10
242
Polk _________________
7
246-B Clarke ________________
256-B Appling ______________
11
256-C Appling ______________
11
>-' 258-B Clayton ______________
6
.0..... 263-B Walker_______________
7
264
Early ________________
266 Dawson ______________
272-B Bibb ________________
1.376
6. 443 4.527
1.444 6.487
5.836
4.214 3.555
2. 945
.026
. 765
4.863
.027
1.147
.046
280 Clayton ______________
2.925
283
Forsyth ______________
287
Toombs ______________
12
3.379
2. 758
288-B Muscogee _____________
299-C Pulaski_ ______________
12
299-D Wilcox_ ______________
12
309-A '\\rayne_______________
11
311-A Elbert ________________
8
311-B Elbert__ ______________
3. 734
1.273
.049
3.801
3.928
3. 741
4.526
2.208
314
Wilkes _______________
.352
318 Chatham ______ -------
321
Forsyth ______________
326
Iillbun _______________
.997 7.525
.954
329
329-B
334-B
337-B
340-A
342
347-B
,_. 348-B
""0
351
351-A
353-ll
360-B
360-ll
360-D
371-B
386
394-C
394-D
403-B
403-C
I Project
Number'
COUNTY
412-E Wheclrr __
428-A Bryan
428-R Bryan __
432-ll Camden __
432-I Carndf'll_
434-A Oconee
435-R Wilkinson_
,_. 435-C Laurens_
0 c.:>
436-A Pulaski_
436-l Pulaski __
4:37-A Glascork_
437-H Glascock_
443-A Jasprr _
H:l-C .Jasper_
443-E Jones_
449-C D"Kalb
452-R JcnkinR_
452-C Bulloch
4.52-H Jrnkins
453-C Muscogcc_
41i2-A Gilmrr_
484 Hichmond_
481i-ll Tattna\L..
490-B Fulton ___
491-A Bartow_
Eng.
11 11 10 12 12 12 10 10
[)
10 1
STAT HIGHWAY IIOARD 01' QU)RGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
Graded Earth
Top Soil and
Sand Clay
Gravel and
Macadam
Resurface
Surface
I
I I
Bituminous I
Cement
Treatment Concrete \ Concrete
---1-
,------
1
\
Brick 1 Structures
_\ ___ _
-- I
.121
.028
.229 .886
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
Project Number
COUNTY
Eng. Cong. Comm. Div. Dis!. Dist.
Graded Earth
Top Soil and
Sand Clay
Gravel and
Macadam
Resurface
Surface Bituminous Treatment Concrete
Cement Concrete
Brick
Structures
491-C Gordon _________ .. ___ 495-B Randolph ____________
496-B Gwinnett _____
496-E Gwinnett -----------498-B HalL _______
499-C Houston _____
......
0
506-B 506-C 508-B
Columbia ______
Columbia __ Grady _____
508-C Grady ______
510-B Screven ___
511-B Crisp ____ ----------513-B Bacon _____
514-B Thomas ___ 517-A Pike ______
517-B Meriwether ____ 520 Macon ____
520-B Taylor _______ . . . . . ---
525 Douglas. ___ 526 Turner ____
527 Richmond
528 DeKalb ____
528 Fulton ___ 529-A Barrow ____
529-A Jackson __
2.232
.026
.963
5.159
2. 620
.099
12
.027
10
4.901
10
1.104
.050
.034
3.314
5.247
. 723
11
5. 931
.094
3.314
3.319
. 706
.078
4.867
2
5.291
3
2.874
4.228
.022
10
1.679
5
--------- ----- -----
.862
.004
1
:_:_:_:_:_:_:_:_:_:_:_: _:_:_:_:_:_:_:_:_:_:_:_:) -
:;0;
.093
----
:::::
:
------
::::::
:-::::::::::r:::::::
::
.862
:::::::::::r::::::::::
.004 .050 .024
STAT HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
Top Soil
Gravel
Project
COUNTY
Eng. Cong. Comm. Graded
and
and
Resurface Surface Bituminous Cement
Brick
Number
Div. Dist. Dist.
Earth
Sand Clay Macadam
Treatment Concrete Concrete
-----1-------- ---- ---l----l----l-----1-----1----l----+----l-----
529-B Jackson_.--------- ...
2.173
530 Towns_--------------
1.481
531 Rockdale.... __ -------
532-A Baker____________ .. __ 533 Cherokee_____________
2.179
.422 1.045 .217
534-A DeKalb _____ --------. 534-A Fulton _______________
3.043 .448
...... 534-B DeKalb_ ..... --------
5
""0 535-A Cobb________________ 535-B Fulton _______________
7
535-C Fulton _______________
5
535-C Cobb ________________
7
535-D Cobb ________________
7
536 Dougherty ____________
537-A Richmond _______ .....
10
538-A Peach __________ . . ____ 2 12
539 Upson _______________ 2
540 Hart_ ________________ 3
541 Clinch _______________
11
542 MitchelL ____________
543 Coffee ________________
11
544 Habersham __________ .
g
544 Stephens ______ .... ___ 586 Harris________________
590-B Baldwin ____ ._ ...... _. 2 10
5.298 3.806
4.768
5.108 3.864
1.522
4. 735
.483
5.037
.997
2.698
5.007 5.277
Structures
.011
.149 .017
.006 .018 .048 .049 .094 .048 .099 .058 .037
.007 .014
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
Top Soil
Gravel
Project
COUNTY
Eng. Cong. Comm. Graded
and
and
Resurface Surface Bituminous Cement
Brick
Structures
Number
Div. Dis!. Dist.
Earth
Sand Clay Macadam
Treatment Concrete Concrete
- - - ~-------!--- -----~ - - - - - - ------~ - - - - - - - ---~--- ---~- - - - - -~-~ ~---- ---~-
591-C 592 593-A 593-B
Bryan _______ _ Rumtcr ______________ _
Burke _______________ _ Burke_______________ _
1.991
3. 716 4.236
3.382 3.598
594 Burke ______ _
595 \rarren _____________ _
10
4.000 4. 724
3.823
597 Meriweth('r __________ _
.284
615 Harris ______________ _
4
.353
615 Troup_
4
7.830
616
Troup _______________ _
2.572
629-B Richmond_
10
651-B Pike ________________ _
-- ::::::r: ------
3.295 2.049
651-C Pike __
6
674-A Jones ________ -- ____ --
6
696-A Gilmer ____________ _
--~-: :~:: 1.495
-:::: :_ 1::::::::
3.386 11.000
738-A Carroll
I
1.022
.006
755-A Banks ______________ _
3.681
.004
771 785-A 787-C
Greene ________ _ Whitfield ____________ _ Talbot_ __
1.121
1. 703
15.374 ----- :-::::::::_- ::::::::::::1::::::::::::
800-A 800-B 804 813 817-A
Morgan __ Morgan __
Peach Butts __ Troup_
4.!121
I
12 6
,,1 !....... J I ... 1.. ,;:; 1( ..
8. 655 ------------ 1------------
6.066 ~~: ~~~~ 1~:::: ::: ::
---------,------------ !------------
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
Project Number
COUNTY
Eng. Con g. Comm. Div. Dis!. Dis!.
817-B Meriwether ___ -------820-A Johnson ______________
838 847-C 852
Gordon __ ----------Doo]y ___ ------------
"\Vilkinson
857-E DeKalb_ ___ 857-F Gwinnett ______
...... 859-B Floyd __
0 -'1
862
Tattna!L ____________
862-A Tattna!L ____
905-E Echols __
905-F Clinch ___
910-B Decatur __ 919-C ChathanL ________
932-D Wilcox_
942-D Johnson_
944-C Dodge ___
944-D 1\viggs ___
944-D Bibb __
944-E Bleckley _____ 951-A Marion _______________
951-B Marion ____
951-C Marion _____
951-D Marion ____ 976-A Jasper ________
I
12
2
:l
10 5
11 11
12 12 12 12
12
Graded Earth
I Top soil
and
Sand Clay
2. 622
2.169
3.341 1.860 9.420 1.615 2.840 5.993
1.521 .312
Gravel and
Macadam 4.000 2.672 5.079
8.455
Resurface
Surface Treatment
Bituminous Cement
Brick
Structures
Concrete Concrete
- - - - - - --~------
-------~-
I. 736
1.684 4.363
.004 .077 .029 .219
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
Top soil
Gravel
Project
COUNTY
Eng. Cong. Comm. Graded
and
and
Resurface Surface Bituminous Cement
Brick Structures
Number
Dlv. Dist. Dis!.
Earth Sand Clay Macadam
Treatment Concrete Concrete
---1--------1---------------------------1----1------------------
976-B Jasper_. __ -----------
6
1003-A TattnaiL ____________
1. 704
5.673
1003-B Candler--------------
1.585
.166
1008 ClaY-----------------
.034
1013 Effingham. ___________
3.575
.098
1014-B Wilcox. ______________
12
1.496
1021-A Marion _______________
4
1.140
1-' 1021-B Schley_. _____________
4.449
0 00
1022-A 1025-A
Jenkins ____ ---------Pulaski ______________
12
2.887
7.555
1025-C Houston ______________
12
5.134
.075
1028-B Spalding __ .---------_ 2
2
3.655
1030-A Pulaski. ___ ---------_ 2 12
2
3.968
1031
Tift_ ________________
5.496
.030
1033-A Cherokee _____________
3.050
1034-B Crisp ________________
5.366
1036 Crawford _____________
10.817
1039-B Macon _______________
6.456
.004
1041-B Calhoun ______________
4.181
.015
1042-A Calhoun ______________
2
2.113
1045-A Crawford ______ -------
6
3.520
1052-C Paulding ___ ------ ____
1053-A Lanier _______________
11
.312
1057-C Thomas______________
2
1069-B Brantley _____ --------
11
.681
3.927 5.397
.579 ------------------------------------ ____________( ___________{ .019
STATE HIGHWAY BOARD OF QEORQIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
Project
COUNTY
Eng. Con g. Comm.
Number
Div. Dist. Dist.
- - ----
1072-A Irwin_ ------------
11
1072-B Berrien __
11
1080 Bulloch ______
I
1082-A Coffee_
11
1086
Burke _____
1087-A Lanier ___
11
1087-B Atkinson ______
11
>-' 1087-C Clinch ___
11
0
~
1097-A
Taylor _______
1117 Columbia ____
10
1118 Hart_ ________
8
1121 EmanueL ____________
12
1122-B Johnson ____
2 12
1124-A Oglethorpe __
3
8
1126-A Lowndes __
11
1127-B Newton __
8
1502-A Clarke ______
1502-B ,Jack<mn_
1508-B Cherokee _______
1510-A Montgomery ____
12
!SlO-B Treutlen _______
12
1516-A Upson _______
6
1520 Banks __
1521-A Ben HilL
1522-A Telfair_
12
Graded Earth
2. 739 .492
2.516 7.308
.511
6. 933 .885
2.528
2.746 6.318
Top soil
Gravel
and
and
Resurface
Surface Bituminous Cement
Brick
Structures
Sand Clay Macadam
Treatment Concrete Concrete
---------- ------ ---- --,---------;-------- ------- ------
3.172
.151
2.697
-----
7.361
.010
.014
3. 896
3.553
I. 704
2.585
.030
1.580
2.511
3.511
1.302
3. 993 .8S4 .432
Sll9 --------,
10.253
- - - - - - - ~~-------
Project I
Number
COUNTY
1522-ll Coffee_
1522-B Telfair ___
152:l
- Tattnall ------ ~---
1524-A Turner
1524-ll Worth_
lS26 Upson_
1528-A Dougherty
1530-A Terrell
............
0
1533-ll 1534
Laurens Jeff('rson_
153\1 Douglas
1542-A Pierce_
154:J
Brooks_
1545
Newton __
1548-A Chattahoochcf' _
1S48-B Mariou_
155:l Walton_
1.158-A Clarke_
1558-B Madison.
1561-A Laurens_
1561-ll Treut.lcn_
1561-B Laurens_
15fi8-A Bulloch_
1569-A Heard_
TOTAL~--
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
I Eng. I Cong. Comm.
_o_;v.__ _ll~t. l_[)j~
Top soil and
Sand Clay
Gravel and
Macadam
Resurface
11 12
12 10 11 11 8
12 12 12
I 22.045 1
Bituminous
Concrete
Cement
Brick Structures .384 .:l83
.11:37
.024 .020
STATE HIGHWAY BOARD OF GEORGIA MILEAGE PLACED UNDER CONSTRUCTION BY ENGINEERING DIVISIONS AND
COMMISSIONERS DISTRICTS DURING FISCAL YEAR ENDING JUNE 30, 1935
Number
Division and I Division and I Division and
of
Type of Construction
District
District
District
Total
Projects
One
Two
Three
- - - 1 - - - - - - - - - - - - - - - (Miles)
(Miles)
!Miles)
(Miles)
~---------------------
48
10
..................
104 80
6
Graded Earth __ _ Top Soil and Sand Clay Gravel and Macadam__ _ Resurface __________ _
Surface Treatment_ ___ _
73.924 1.833
91.717 89.150 6.104
32.105 15.375 148.446 95.174
6.936
35.588 4.837
89.412 70.983 9.458
141.617 22.045 329.575 255.307 22.498
6
Bituminous Concrete_
42
Cement Concrete ____ _
2
Brick_____ __
78
Structures_____ _
-----------
13.468
--
__
2.326
4.521
18.899
42.065
43.163
.382
1.454 .
1.197
23.420 98.696
.382 4.977
--------1
376
TOTALS _____ _
------1~-278.522- --346.458 - , - 2 7 3 . 5 3 7 - 898.517 1
---------------------------------------~ =..::,
"-
1====-=--==1:-=----=-- _ -__=::==
STATE HIGHWAY BOARD OF GEORGIA
MILEAGE PLACED UNDER CONSTRUCTION BY CONGRESSIONAL DISTRICTS
DURING FISCAL YEAR ENDING JUNE 30, 1935
a."Gc")
.r.J.,l
..o...~~
i
z;:I 0
,t
i
Type of Construction
..,
~
1...;
~
I""' ~
I""'. ~
1.~ ..;
'..> ~
1...; . 1...;
~
~
...;
~
- ~- ~- ~- ~- ~- ~- ~- ~- ~
".Jl" oJl" i!Jl" .Jl Jl," "Jll":d]" Jl = ::a = ::a = '=~Jll"= = =G) = = ::a oblOl>:'-:-'~' ~bolEl~-1'~-~--b'llo,.Ec:-:1~"'~-
bO
o""0''
-=-~a'
obl"l"l~'>'='-a~- "ob!OtWl~.~l;!'':-1b[!loJtIl.>l'-=~-a'
oblll"b:~lll'-~'-~'
obOZO:~':--~'
o o o lo 10 o o o o
...;
...;
i:5 "G") rJl
I
.~ ~,.-,
Cla:>~
bOI=::;::I
bo.
1>-
Q) .....
=0 GE-)o'-~-..- o=i'-O~l'-
0
0
""'-~(I)~
Cl.~-'aa-::>">'-
QlE)-~o~~.
0
~~
-.ope":a;~ ::>':
o::a E-o'--'
1~:~~~115.0~0 =~~:~~ 4:~~~~-~~~~~ ~6.0~~ 13.~:7 1
48 Graded Earth~.~~ 10 Top Soil and Sand Clay
5.8251 9.814 10.148 34.682 19.349 141.617
l. 787 3.050 3.634
-------
22.045
104 Gravel and Macadam. 20.099 34.509 33.872 20.452,14. 656 38.372 29.288 15.78128.665 13.958 32.680 47.243 329.575
80 Resurface.~ ........ ... 39.596 8.897 22.677 17.925 9.107 9.353 17.606 12.322 28.759 9.012 43.103 36.950 255.307
6
Surface Treatment. .. ~~
6.104 ------ ------ ------ ------ ------
9.458 ------ -
---- - ---
~
~
~
------
6.936 22.498
6 Bituminous Concrete .. ------ ------ - ----- 4.521 3.832 .430 7.203 ------ 7.434 ~
~
~--
------ 23.420
42
Cement Concrete ------ -
~
~.
1.245
.529 11.095 1.752 22.897 10.289 18.316 7.943
.741
.912 22.977 98.696
2
Brick~~~~~~~~~~~.
. -- ---- -- ------ - ---- ------ ------
.382 ------ ------ ------ ------ - -------- -
.382
78 Structures~~-~~-~~~~~~~~[ .703 .291 .202 .170 .320 .251 .239 .211 .394
.225 1.030
.941 4.977
'IS76
TOTALS. ----- ~ ~ ~ ll3_1 752 59.942 ~.519 59.578 ~.473i77. 72187. 710:~242 86.o59 37.718 112.407[134~6! 898~7
1
1
Project No. 341- A- Baldwin CountySteel and Timber Bridge Over Oconee River Near Milledgeville.
Completed 1935.
Project No. 192- B- Bibb CountyStribling Memorial Bridge, Macon. Completed 1936.
Project Number
30-B
31-B
31-D
31-E
44-B
47
49
............
Ol
58-A 58-A
99-A
106-A
121-B
154-B
158-B
165
190-B
195
228-A
242
258-B
288
348-B
403-C
403-D
432-B
437-B
STAn HIGHWAY IIOARD OF QIU)RQIA SUMMARY OF BRIDGES PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
County
I
Number[]
I I Concrete
Timber,
Eng. Cong.l Comm.
of Concrete and !-Beams !-Beams and
Div. Dis!. Dis!. Bridges (Lin. Ft.)' (lin. Ft.) Concrete Floors
- - .. -~ -~~~ ---~~~~~-
~~- ~~~~~~
Cobb ________________
Dade ________________
:
~I ~
~
-
--
(lin. Ft.) :J:J8.0
Dade __ ------------
3
7' 3
1
Dade ________________
7
HalL _________ ------
Screven ______________
90.0 120.0 2:l2.0
MitchelL ___ Butts ________________
Butts-Jasper _________ Thomas _____
120.0
760.0
120.0
Sumter _______
Randolph ____
Wayne
11
240.0
4uo.o
Twiggs -----------
12
Polk __ --------------
Murray
Mcintosh __
Greene ____
Polk _________________
190.0
840.0 850.0
Clayton ______________
Muscogee ______ Sumter _______________
Berrien __ ------------
11
Tift ____________
Camden ______________
11
Glascock _____________
10
80.0
495.0 120.0 280.0
640.0
Timber (Lin. Ft.)
845.0
Concrete Bridge Culverts (Lin. Ft.)
Concrete Piers and Structural
Steel (lin. Ft.)
Widened Concrete (Lin. Ft.)
122.0 48.0
89.0
46.0 24.0
28.0 44.0 27.0
121.0 188.0
34.0
111.0 258.0
Totals (lin. Ft.)
460.0 48.0 90.0 120.0 232.0 89.0 120.0 126.0 760.0 46.0 240.0 24.0 460.0 190.0 34.0 121.0 840.0 850.0 139.0 124.0 258.0 495.0 147.0 468.0 845.0 640.0
Project
County
Eng.
Number
Div.
452-C
484 4[10-B 491-C 498-B 499-C 506-B 506-C 508-B
51~-B
517-B 526 528 529-A 529-A 530 533 534-A 5:15-A 535-B 535-C 535-D 536 537-A 538-A 539
Bulloch _____________ _
Richmond ___________ _ Fulton ______________ _ Gordon _____________ _
HaiL __ ------------Houston ______ _ Columbia ____________ _ Columbia ____________ _
Grady_ Bacon ______________ _
1 Meriwether
Turnrr -------------Fulton-DeKalb. __ _ Barrow______________ _
Jackson-Barrow ______ _
Towns_-------------Cherokee____________ .
DeKalb... ----------Cobb ________________ _ Fulton ______________ _
Fulton-Cobb ___ ._. ___ _
Cobb--------- 'I DoughPrty___________ _
Richmond ___________ _ Peach _______________ _ \ Upson _________ _____ _
Cong. Dist.
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF BRIDGES PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935
Comm. Dist.
Number
Concrete
of Concrete and 1-Beams
Bridges (Lin. Ft.) (Lin. Ft.)
Timber, 1-Beams and Concrete Floors
(Lin. Ft.)
Timber (Lin. Ft.)
10
150.0
I, 210.0
525.0
12
144.0
10
80.0
10
246.0
180.0
11
500.0
407.0
120.0
100.0 95.0
260.0 790.0
59.0
5
96.0
5&7
515.0
10
202.0
12
Concrete Bridge Culverts
(Lin. Ft.)
Concrete Piers and Structural
Steel (Lin. Ft.)
Widened Concrete (Lin. Ft.)
159.0
142.0
23.0
37.0 34.0
23.0 34.0
Totals (Lin. Ft.)
159.0 150.0 1,210.0 142.0 525.0 144.0 80.0 269.0 180.0 500.0 407.0 120.0 37.0 134.0 260.0 59.0 790.0 118.0 34.0 96.0 515.0 48.0 360.0 202.0 530.0 302.0
STAT& - A Y - CIP _ , . SUMMARY OP' BfttDGU PLACm UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 193&
Project
County
Number
Concrete
Timber,
Eng. Cong. Comm. of Concrete and 1-Beams 1-Beams and
Timber
Concrete Bridge
Concrete\ Piers and Widened Structural Concrete
Totals (Lin. Ft.)
Number
Div. Dist. Dist. Bridges (Lin. Ft.) (Lin. Ft.) Concrete Floors (Lin. Ft.) Culverts
Steel
(lin. Ft.)
(Lin, Ft.)
(Lin. Ft.) (Lin. Ft.)
I - - - - - - - - - - - - - - - :~-
-~---~-
----------------------------------------
540
543 544 592 738-A 755-A 859-B 905-F 932-D
...,............ 944-D 1003-B 1008 1013 1025-C 1039-B 1041-B 1057-C 1069-B 1087-A 1121 1522-B 1523 1530-A 1533-A 1534-B 1545 IM8-A 1561-B
Hart..... ----------Coffee ___ -----------Stephens. Sumter ____
Carroll Banks _________ Floyd _____
Clinch Wilcox __ Twiggs _______
Candler-------------Clay _________________
Effingham. __________
Houston ____ --------Macon ___________ ---_
Calhoun... ___ ------Thomas. _____________
Brantley-------- ______ Lanier __________ -----
EmanueL _____ ------Coffee-Telfair _________ Tattna!L ____________ TerrelL ______________ Laurens ______________
Jefferson _______ -----Newton ____________ -Chattahoochee ________ Treutlen-Laurens ______
8
3
II
II 12 12
I
12
II 11 12 11&12
12
10
2
8
3
12
__ -----------78.0
234.0
100.0
200.0
!20.0
280.0 I, 143.0
820.0 460.0 320.0 160.0 100 0
160 0 3,631.0 1,250.0
200.0
409.0 180.0 1,803.0
_________ -------- -- --------37.0
34.0 34.0
27.0
23.0 27.0 55.0
46.0 21.0 42.0
420.0
200.0 37.0 78.0 34.0 34.0 120.0 27.0 409.0 280.0 I, 143.0 820.0 180.0 460.0 320.0 183.0 100.0 27.0 1,803.0 55.0 160.0 4,051.0 I, 250.0 46.0 21.0 42.0 100.0 200.0 234.0
TOTALS. _________ '------- -------- -------- 126
623.0
4,124.0
17,302.0
3,296.0
762.0
729.0
915.0 27,751.0
STATE HIGHWAY BOARD OF GEORGIA
LABORATORY
MATERIALS TESTED OR INSPECTED
July 1,1934 to June 30,1936
--- Kind of Material
j.Spbalt--- .--------------
jj..SSppbbaalltt SMaInXd._-_-
________ _
seamS----------------------------
sronze __ --------- ------------
ooeomaresnetA.-g--g-re- -g-a-t-e ___________ _
ooncrete Cores_-_
_ __
ooncrete Cylinders __ _
ooncrete Pipe- __ - __ ----
corrugated Metal Pipe __ :Expansion Joint__________________ _
rertilizer--- - -rmer (Asphalt) __ orader Blade_ orease ___ ------ouard Rail_-_ L!IIlerock ___ . ______ .
on _________ _
Asbestos ________ _
Paint---:-------Right of Way Markers__
Sand-----------Sign MetaL Sodium Silicate ___ _ SteeL __ - __ _ Tar ______ _
Timber ___ _ Top Soil __ _ Water ___ _
~~-N_u_m_b_er~-
------ i
700
9
7l 50
2 2436 1669
502 2626
184 632 65
3 l
l
53 23 404 62
l 133 23
715 l
l
344 410
3 3610
154
TotaL __ _
-1-14,888-
~~~~~-'----
119
PART THREE
FISCAL YEAR ENDING JUNE 30, 1936
STATE HIGHWAY BOARD OF GEORGIA
Exhibit "A"
STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES
JUNE 30, 1936
ASSETS
Current Assets Cash in Banks State Funds _______ ------------ ________ ---National Recovery Trust Fund______________
$ 4, 720,373.00 387,598.41
$ 5,107,971.41
State Treasurer, Highway Funds ______________ _
U.S. Government, Vouchers in Transit Federal Aid Projects _______________________ _
National Recovery Projects. ________ -------Works Program Projects __ ------------------
$ 1,015,169.02
60,549.05 205,507.39 120,905.52
386 ...961.96
Accounts Receivable ____________ ------ _______ _ Advances ____ _
Deferred Charges Inventory of Supplies and Materials ___________ _ Shop Jobs in Process ____ --------------------Undistributed Payrolls __ ----- ________________ _ Undistributed Charges, Misc. _________________ _
191,036.26
1,345.00 $ 6,702,483.65 ---.-,---
122,729.00 11,390.26 54,027.21 27,487.44
215,633.91
Total Proprietary Assets ___ ---- ______ ----------- ___ _
s 6,918,117.60
Capital Investments Land, Buildings & Equipment (Schedule No.4) Land ____________________________________ _
Buildings ________ _ Trucks ___________________________________ _
Tractors___
__________________ ---
Other Road Equipment ____________________ _
Engineering Equipment__
--------------
Office Equipment ________ ------------------
Shop Equipment___
----------------
Laboratory Equipment ____________________ _
Quarry Equipment_ -----------------------
178,795.2~
314,719.00 189,750.00 135,170.00 266,091.78 34,993.71 36,851.45 42,760.00 13,653.90 48,508.00
$ 1,261,293.09
Roads and Bridges Construction Cost to Date On Closed Projects ____ _
On Open Projects
$139,368,582.51 !4,921,958.73 $154,290,541.24
W. & A. Rental Warrants ____________________ _
$ 1,620,000.00
Total Capital Investments _________________________________________________ $157,171,834.33
TotaL ___________________________________ --------- __ ------ ______________ $164,089,951.89 ===--===
122
STATE HIGHWAY BOARD OF GEORGIA
Exhibit "A"
STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES
JUNE 30, 1936
LIABILITIES, FUND BALANCES AND SURPLUS
c.rnnt Liabilities
Accounts Payable.--------------------------U.S. Government Advance ___________________ _
none 600,000.00
Total Proprietary Liabilities ____ . . ----------. __ ------
600,000.00
...... 81Jances (Schedule No: 6) .. Construction Contract Ltabihties Contracts, State __ _....._----------------------Contracts, FederaL.-----------------------
$ 2, 732, 155.69 4,302,7413.17
TotaL __ ----------------------------------------------
Less: Participation Receivables
Federal Funds ... ------------------------ $ 3,354,163.24
Other Funds, Net._______________________
16,940.63
$ 7, 124,901.86 S 3,371,10:1.87
Net Liabilities, State Funds ____________ _
Unencumbered Allotments Balances Construction, State Forces __________________ _ Reconstruction Projects_------------- ______ _ Survey Projects . . . __ . . . _. ___ ._. ___________ _
Maintenance, GeneraL ___________ ----------Convict Farm_____________ ----------- _____ _ Refunding Certificates, 1936 ________________ _
s 3,753,797.99
594,200.34 277,976.92 59,977.50
73,868.29 62,542.73 11,819.32
1,080,385.10
Unliquidated Purchase Orders _________________ _
261,620.65
Total Fund Balances ______________ ------ ______ ---- __ .. _______ ---._______ $ 5,095, 803.74
C1f1ta1 Liabilities and Surplus
Capital Liabilities Refunding Certificates-Due I 936-1945. _____ _
Surplus Invested in Plant & Equipment. _____ _ Surplus Invested in Highways _________________ _ SurplUB Invested in "\V. & A. \\"~"arrants _________ _
s 23,957,085.44
1,261,293.09 130,333.455.80
I ,620,000.00
Total Capital Liabilities & Surplus. ________________ . __________ ---- _______ $157, 171,834.33
t:.nnt Fund Surplus-Exhibit "B" Surplus Deficit, State Funds ___________ _
Surplus Reserves For County Construction Contracts-Detail Estimates Incomplete ____________________ _
For Revolving Fund (Doubtful Assets and Deferred Charges) _______________________ ---_
For Redemption of Refunding CertificatesMarch, 1937 _______ ---------------------
624,075. 75Dr.
91,141.21 424,955.80 1,330,292.56 $ 1,846,389.57
Net Surplus, State Funds ___ _ TotaL _______________ _
1,222,313.82 $164,089,951.89
NOTE: Current Surplus, as ahoYe, does not include unallottcd Federal Funds amounting to Sl2 ,265,599. 96
123
STATE HIGHWAY BOARD OF GEORGIA RECONCILIATION OF FUND SURPLUS REFLECTING FUND REVENUE, ALLOTMENTS AND RESERVES
JULY 1, 1935 TO JUNE 30, 1936
Exhibit "8"
Current Fund Surplus, July 1, 1935
Available Surplus, State Funds _________________ $ 1,319,948.09
Less: Lapsed State Appropriation____________
963,348.71
356,599.38
Surplus Reserves _________ -~ ___ _
1,729,530.15 $ 2,086,129.53
FUND REVENUE
Revenue Received (Schedule No.7)
Motor Vehicle_______________________________ S I, 392,012.38
Gasoline Taxes ________________ ----------_____ 10,404,393.81
Miscellaneous Income ____________ ------------
1,442.13
$11,797,848.32
Estimated Participation Accruals National Recovery Allotments ________________ _
\Vorks Program Allotments_------------------Other Federal Allotments _________ ----------Other Construction Participation_
$ 1,336,978.16 1,147,576.33 1,046,442.72 6,075.12
$ 3,537,072.33
Total Fund Revenue ____ _
$15,334,920.65
Available for Allotments ___ ------------------- _______________ _
$17,421,050.18
FUND ALLOTMENTS
Continuing Allotments (Schedule No. 6)
Construction Projects Contracts, State Aid ____________ _
s 5,403,634.15
Contracts, National Recovery _____ ---------- 1,483,137.12
Contracts, \Vorks Program ___ --------------- 1,210,052. 96
Contracts, Other FederaL _____ _ State Forces & Materials ____________ _
2,266,126.02 784,135 fill
$ll, 147,085.91
Murvey Projects _____ _ Reconstruction Projects Maintenance, GeneraL _______ . ______________ _
Redemption of Refunding Certificatco_
213' 762.72 659,560.75
1 '175' 724. 84 2,660,585.12
Total Continuing Allotments __ _
$15,856,719.34
Non-Continuing Allotments (Scherlule No. 6) Administration ____________________ _
Research and Analysis Collection of Revenue ______________ _ Quarry _____________________________________ _
Equipment __________ ----- __________________ _ Shop, Net ____________ _
Legislative TransfersMotor Vehicle Tags __
228' 887 05 i6 .10
42,181.59 I ,420.19 l1 '758 .03
128. 67Cr.
57' 822.73
Non-Continuing Allotments_ Total Fund Allotments ________________ _
342,017.02 $16,198,736.36
Current Fund Surplus, June 30, 1936-Exhibit "A" Surplus Deficit, State Funds. Surplus Reserveo. __
624,075. 75Dr.
s 1,846,389.57 1,222,313.82
124
THE HIGHWAY DOLLAR
/i3t7erc/ /0nt7S C'3.96%
INCOME
U/?o( ,&v//b/a'f'S & c.r~//,Pn=-or .a7%
C<?n.57"rvc7"/~n ?/.a6%
EXPENDITURES JULY I 1935 TO JUNE30 1936
STATE HIGHWAY BOARD OF GEORGIA
Exhibit "C"
STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES
JULY 1, 1935 TO JUNE 30, 1936
REVENUE RECEIPTS
State Treasurer Motor Vehicle Fees __________________________ _
Fuel Oil Tax ________________________________ _
$ 1.392,012.38 10,404,393.81 $11 '796,406,)g
U. S. Government Reimbursements for Construction: National Recovery Projects _________ ----- __ _ '\Vorks Program Projects ________ ---- _______ _ Othe~ Federal Projects _____________________ _
$ 3,038,813.82 354,522.20 327,498.75 $3,720,834.77
Railroads, Counties and Cities Cash for Construction ____ _ Contract for Construction ___________ _
Miscellaneous Income ___________________________ _
Total Hevenue Receipts _______ _
9,124.35 121.42
9,245.77
1,442.13
$15,527,928.86
EXPENDITURES
Ad ministration (Schedule No. 8-A) General Administration General Office ____ ----------- __ ---- ________ _
Division Offices ___ ------------------------\Varchouse _______ ---------- ______________ _
187,368.42 29,513.22 13,547.32
Research ___________________________________ _
Collection of Revenue. ______________________ _ Quarry _____________________________________ _
230,428.96
329 0 79 42,181.59 1,419.24
274,359.58
Construction (Schedule No. !l-8) Surveys Actual S"rveys ____________________________ _
Plan-------------------------------------
117,193.39 93' 215 0 91
210,409.30
Construction Supervision _______________________________ _ Actual Construction ___________ -------------
427' 189.58 10,108,652.63
10,535,842.21
10,746,251.51
Maintenance (Schedule No. 8-C) General Supervision _______________________________ _
Actual Maintenance __________ --------------
s 54,794.60
1,082,938.23
$ 1,137,732.83
Reconstruction Supervision. ______________________________ _
Actual Reconstruction _____________________ _
2,698.49 242,405.48
245,103.97 5 1,382,836.80
126
Exhibit "C" Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES
JULY 1, 1935 TO JUNE 30, 1936
EXPENDITURES-Cont'd.
Llflll Buildings & Equipment (Schedule No. 8-D)
Adroinistratwn Equipment . ----------------------------
eonetruction Equipment..------------------------------
Maintenance Equipment.-------------------------------
2,664.66 5,603.78 2, 782.81
11,051.25
Llllllatlve Transfers (Schedule No. 8-E) Motor Vehicle License Tags.- .. ------_ ...... .. Prison Farm Purchase ... -------_ ...... ______ _
57,822.73 2, 775.00
60,597.73
Redemption of Debt (Schedule No. 8-F) Refunding Certificates_----------------------
$ 2 ,648, 765.80
Total Expenditures _________ .. ------.----------- __ .. ----------------______ $15,123,862.67
El..,.. Revenue Receipts over Expenditures.........
404,066 .19
Add
Excess Proprietary Assets over Liabilities July 1,
1935.------------------------------------Less: Lapsed State Appropriation _________ _
$ 6,877,400.08 963,348.71 $ 5,914,051.37
El..,.. Proprietary Assets over Liabilities, June 30, 193&----Exhibit "A"----------------------_ ......
s 6,318,117.56
RECONCILIATION
Elceoe Proprietary Assets over Liabilities (As above). Available for Liquidation of Fund Balances and Surplus Reserves .... _____ .... _._ .. _. ____________ __
lund Balances (Contracts-Allotments-Purchase Orders, Etc.) ... ------- ..... ------------------
$ 6,318,117.56 5,095,803.74
Net Surplus State Funds______ -------- __ -------------------- $ 1,222, 313.82
Surplus Reserves (Refunding Certificates, Doubtful As-
eels, Deferred Charges, Unrecorded Contracts)_____
1,846,389.57
Surplus Deficit, State Funds June 30, 1936--Exhibit "A" ________ ------
624,075.75Dr.
127
STATE HIGHWAY BOARD OF GEORGIA
COMPARATIVE STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES
FOR FISCAL YEARS ENDED JUNE 30, '33, '34, '35, '36
================================~F=IS=C=A=L=Y=E=A=R==~
FISCAL YEAR
FISCAL YEAR
Description
ENDED JUNE 30, 1933
ENDED JUNE 30, 1934
ENDED JUNE 30, 1935
Detail
Amount
Detail
Amount
Detail
Amount
Motor Vehicle Fees ______________________ _ Fuel Oil Taxes __________________________ _
Counties, Prior to Refunding Act__________ _ Railroads, Cities and Counties ____________ _ U.S. Government _______________________ _
Miscellaneous Income____________ ------- __
1,120,670.19 7,786,322.58
276,143.27 12,960.06 5,065,020.34 18,852.02
REVENUE RECEIPTS $ I, 233,125.52 8, 779,497.63 24,935.82 15,529.22 4,048,503.74 12.244.63
1,206,051.30 9,655,076.41
28,446.52 6,232,390 34
22,757.91
Total Revenue Receipts ______________ _
14.279. 968 .46
$ 14,113,836.56
$ 17,144,722.48
Exhibit "D"
FISCAL YEAR
ENDED JUNE 30, 1936
Detail
Amount
$ 1,392,012.38 10,404,393.81
9,245. 77 3,720,834.77
1,442.13
$ 15,527.928.86
......
~ Administration General Administration General Office _______________________ _ Division Offices __ -------------------\Varchouse ____ -------------------- __
Research _____________________________ _ Collection of Revenue__________________ _ Quarry-------------------------------
Total Administration ______________ _
EXPENDITURES
294,317.75 66,853.16 18.298.48 $
379,469.39
7,103.81 79,507.38
876.49
466,957.07
200,819.74 39,104.74 13,509.19 $
253,433.67
2,480.03 41,812.11
940.21
298,666.02
197,599.85 28,760.34 13,348.89 $
239,709.08
175.39 39,020.14 1,157.10 -------
280,061.71
187,368.42 29,513.22 13,547.32 $
230,428.96
329.79 42,181.59 1,419.24
~-----
274,359.58
Construction Surveys_______________________ ------__
Construction Supervision. _________________________ S 672,861.64
Actual Construction.----------------- 10,696,769.96
127,316.44 11,309,631.60
Total CoDBtruot\on~ ~~~--~----------
11,496,948.04
392,117.74 8,481,204.62
142,906.71
239.930.98
210,409.30
444,001.33
427,189.58
8,873,322.36 10,936,059.00 11,380,060.33 10,108,652.63 10,535,842.21
9,016,229.07
11,619,991.31
I IO, 148,2/11 .III
Description
STAT& HIGHWAY IIOARO OF OllORGIA COMPARATIVE STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES
FOR FISCAL YEARS ENDED JUNE 30, '33, '34, '35, '36
FISCAL YEAR
ENDED JUNE 30, 1933
Detail
Amount
FISCAL YEAR
ENDED JUNE 30, 1934
Detail
Amount
FISCAL YEAR
ENDED JUNE 30, 1935
Detail
Amount
--~-
FISCAL YEAR
ENDED JUNE 30, 1936
Detail
Amount
Maintenance Reconstruction _______ _ General Maintenance Supervision_________________________ _ Actual Maintenance ________ ----- _____ _
Total Maintenance ________________ _
Land, Buildings and Equipment. ... ~ Legislative Transfers ____________________ _ <e Redemption of Refunding Certificates ...
Total Expenditures ___________ ------
10,022.11 82,674.30 1,306,631.06 1,389,305.36
1,399,327.47 64,477.08
1,108.909.15
$ 14,536,618.81
66,298.72
14,219.21
245,103.97
79,507.15 1,051,282.24 1, 130,789.39
1,197,088.11
133.906.93 54,368.05
----- --~----
s 10,700.258.18
~2.910.83
1.098,943.18
1,161,854.01
1,176,073.22
-----
18,695.01 2,060,606.62
------------------
$ 15,155,427.87
54,794.60 1,082,938 23 ------
1,137,732.83 1,382,836.80
11,051.25
60,597.73
2,648,765.80 -------
s 15,123,862.67
Excess Expenditures over Receipts ___ -----Excess Receipts over Expenditures ________ _ ADD
Cash,Inventories,etc.,beginning of Period.
BALANCE Cash, Inventories, etc., end of Period_----
DEDUCT Fund Balances-Contracts, Reserves, Encumbrances end of Period ____________ _
256,650.35 1,731,177.44 $ 1,474,527.09 4,436,080.54
3,413,578.38 1,474,527.09 I 4,888,105.47 3,934,744.57
1,989,294.61 4,888,105.47 $ 6,877,400.08 5,557,451.99
404,066.19 5,914,051.37
-----
6,318,117.56
6,942,193.31
Fund Deficit, June 30, 1933, '36..........
2,961,553.45
624,075.75
Fund Surplus, June 30, 1934. '35 . . . . . . . . .
953,360.90
$ 1,319,948.09
STATE HIGHWAY BOARD OF GEORGIA LAND, BUILDINGS AND EQUIPMENT JUNE 30, 1936
8cb.edu\e No.4.
Appraised
Description
Value
July 1,1935
------------------------ -----------
Additions for
Fiscal Year 1935-36
Total
Depreciation
Appraised
June 30,1936 for Fiscal Year
Value
1935-36
June 30,1936
------------ ------------- ---------
Land ____________________________ $ 178,795.25
Buildings _______________________
314,729.00
Automobiles ____________________
------
Trucks _________________________
268,445.00
T r a c t o r s _______________________
133,760.00
Other Road Equipment_ _______
321,139.60
Engineering Equipment ________
36,421.00
Office Equipment ______________
39,513.70
Shop Equipment _______________
47,599.00
Laboratory Equipment_________
14,953.00
Quarry Equipment_____________
52,763.00
Totals_____________________ $ 1,408,118.55
------ -----------$
---- -------------
178,795.25
------ --- ----
$
314,729.00 $
10.00
178,795.25 314,719.00
- - - - - - - - - -
---
----. -----. ------
--
-
------
$
2,118.97
270,563.97
80,813.97
189,750.00
2,575.00
136,335.00
1,165.00
135,170.00
1,340.37 3,560.80
322,479.97 39,981.80
56,388.19 4,988.09
I
I
266,091.78 34,993.71
1,194.14
40,707.84
3,856.39
36,851.45
-- . -" ----------
47,599.00
4,839.00
42,760.00
261.97
15,214.97
1, 561.07
13,653.90
---- -------------
52,763.00
4,255.00
48,508.00
------------- ----------- ------------
1$
11,051.25 $ 1,419,169.80 $ 157,876.71
Total Appraised Value,June 30,1936-Exhibit "A" _____________________________________________________ _
1,261,293.09
Schedule No
STATE HIGHWAY BOARD OF GEORGIA
.G
STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1936
Due March 25,1937 through March 25,1945
l County
Appling __________ $
Atkinson _______ _ Bacon __________ _1 Baker ___________ -~ Baldwin ________ _ Banks __________ _ Barrow ________ _ Bartow ________ _
BBiebnbH__i_l_L__-_-_-_-_-_--_ Bleckley _______ _ Brantley ________ _ Brooks__________ . Bryan ___________ . Bulloch. ________ _ Burke ___________ _ Butts. __________ _
Calhoun. _______ _ Camden ________ _ CampbelL ______ _ Candler.. _______ _ CarrolL ________ _ Catoosa .. _______ . Charlton _______ _ Chatham _______ _ Chattahoochee __ Chattooga______ _ Cherokee _______ _ Clarke __________ _ Clay ____________ _ Clayton_________ _ Clinch __________ _ Cobb ____________ _ Coffee .. _________ _ Colquitt. _______ _ Columbia_______ _ Cook____________ _ Coweta _________ _ Crawford _______ _ Crisp ___________ _ Dade____________ _ Dawson _________ _ Decatur ________ _ DeKalb _________ _ Dodge __________ _ Dooly___________ _ Dougherty______ _ Douglas _________ _ Early ___________ _ Effingham ______ _
Amount 1I' --~unty
I
~
1_ _
219,348.13 1 Elbert ___________ !$
I 11,083.14
23,645.61
EmanueL-------~ Evan~------------
22,472.48 Fannm__________
89,934.80 I' Fayette__________ !
67,672.43 Floyd------------~
64,548.72 I Forsyth__________
111,869.86 Franklin ___ ------~ 55,260.52 I Fulton___________
752,261.91 Gilmer_ __ -------- 'I
23,945.61 Glynn--_-------32,431.46 Gordon_________
323,388.46 Grady_---------
27,561.22 Greene_--------
111,383.08 Gwinnett_______
219,267.59 Habersham_____
74,536.29 HalL_________
8,979.97 Hancock________
11,836.80 Haralson_------
185,303.99 Harris ___ ----
27,751.88 Hart____________
471,433.40 Heard_________
20,828.57 Henry__________
73,213.40 Houston______
1,179,071.51 Irwin ____ ----___
16,088.37 Jackson_-------
112,309.30 Jasper__________
179,558.75 Jeff Davis.______
335,679.42 Jefferson_______
42,426.98 Jenkins__________
44,282.18 Johnson________
55,938.20 Jones___________
250,751.52 Lamar._________
68,364.98 Laurens________
161,001.05 1 Lee_____________
55,678.75 Liberty_________
188,759.64 1 Lincoln__________ 438,550.17 I Long____________
28,538.26 Lowndes________
82,385.65 1 Lumpkin_______
67,382.48 Macon__________
23,142.05 Madison________
334,466.88 Marion_________
233,864.81 McDuffie________
57,692.24 Mcintosh_______
172,820.62 Meriwether_____
444,523.70 Miller.__________
40,044.91 Milton __________ -~
70,052.51 MitchelL________
51,651.95 Monroe__________
14644494,,,985298168...911097 168 313 45 34827:,715743.:8697
58,672.77
97,888.93 102,533.47
50,517.56 378,670.75 81,940.13
100,770.78 55,496.67 185,426.36 307,563.04 360,352.22 68,331.47
134,693.87 96,010.76 112,955.75 17,218.58 197,632.40
262,252.29 50,890.78
114,830.42 82,492.75 30,058.77 315,814.98 76,578.01 32,084.54 38,589.70 17,549.19 255,818.70 73,358.79 28,198.85 29,547.41 34,357.18 492,549.39 75,682.85 174,233.75 18,323.46 20,536.07 48,284.83 13,749.75 365,322.53 31,856.25
18,641.79 375,473.80 107,446.43
132
Schedule No.5-Cont"d. STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1936 Due March 25,1937 through March 25,1945
County
Amount
County
Amount
)r{ontgomery----- $
){organ.--------)r{urraY---------)r{uscogee ... -- --Newton... -------
oconee. Oglethorpe-----paulding .. ------peach.. ----------
Pickens.--------Pierce.- --- - - - - - - Pike .. - - -- - -- - - - Polk.. ----------PUlaski.- --- -- -- Putnam.-------Rabun.. - -- --- -- Randolph__ ------
Richmond.-----Rockdale ... ----Schley.- .. ------Screven_________ _
Seminole .. ___ ---Spalding________ _ Stephens ______ _ Stewart _________ _ Sumter _________ _ Talbot __________ _
Taliaferro ______ _
Tattnall ____ _ Taylor __________ _
112,122.63 Telfair. __________ $
66,949.05
233,291.15 TerrelL _____ .____
244,373.30
80,830.04 ' Thomas___ ___
352,450.50
745,035.36 Tift__
160,072.17
85,921.83 Toombs__
185,023.86
23,495.78 Towns___________
40,575.83
35,351.32 Treutlen_________
1,800.00
17,241.52 Troup___________
568,130.01
7,375.22 1 Turner__________
21,945.85
::::::: 108,860.86
152,888.09
i ~~{~~s:~::
~~:~i~_-g2
11,527.22 Upson___________
109,427.81
165,068.73 Walker.__________
168,368.46
218,169.47 Walton._________
145,673.57
92,944.54 Ware_
571,115.46
286,767.90 Warren__ _______
20,343.46
74,509.93 Washington_____
95,827.06
1, 025,841.59 Wayne_ _________
245,393.59
1,882.76 Webster_________
12,366.16
49,969.34 Wheeler.___
119,756.40
36,676.08 White______
31,925.54
23,167.83 Whitfield.___
238,976.44
339,917.54 Wilcox_ .. _________
9,084.28
119,728.53 Wilkes_
_ _ _ _
241,878.55
45,497.61 Wilkinson .. ______
32,454.60
328,832.75 Worth___ _______
220,521.40
66,909.56 Coastal Highway
794,608.98
14,122.67 39,079.86
-1$ TotaL ____ 23,945,266.12
23,450.89
Due March 25,1936 but not presented for payment.
Columbia. ______ .$ Dade_____________ Dawson__________ CampbelL_______ Fulton___________
~ton___________
Rockdale________
Coastal Highway
1,301.22 7, 486.94
571.34
589.33 192.61 1,071.31 209.19
397.38
TotaL _____________ _
------------ __ $
11,819.32
Grand TotaL ______________ _
_____________ $ 23,957,085.44
133
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 6.
SUMMARY OF ALLOTMENTS AND FUND BALANCES; ALSO, REFLECTING RECONCILIATION WITH EXPENDITURES
JULY 1, 1935 TO JUNE 3J, 1936
DESCRIPTION
Net I Estimated
I
Fund Balances Participation Fund Balances) Allotments
_ _ _ _ _ _ _ _ _ _ _J_u_l_y_1_,_19_3_51 July 1,1935 July 1,1935 _ 1_ _ _ _ _
- - - - - - - - ----~-
--~--------
Net
Encum-
Expenditures
Total
brances_ _________ Charg(ls_
Estimated
Net
I Fund Balances Participation Encumbrances
_J_"""_~__l_~~ June 30, 1936 June 30, 1936
1
Continuing Allotments
I
Construction Contracts, State Aid__ _________ $2,370,487 37$
20,111.28$2,390.598
1
55$
5,403.534
151$
85.06Cr. $ 5,0ti2,162.17 $ 5.062,077.111$ 2,732,155.69$ 16,940 63$ 2,71.1,215.06
Contracts, Kational
I
]
I Recovery___________ 370,682.52 3,520,347.71 3,891,030.2:!
Contracts, Works
j
Program ___________ ------------------------------------~--
1,483,137.12 1.210,052.96
]
576.46Cr~ 3,476,468.50 3,475,892.04
95.65
3:l8.87!.02j' 338.966.67
1
1,8!J8,275.31j 1,818,512.05
871,086.29 793,054.13
79,763.26 78,032.16
Contracts. Other Federal____________
19,991.57, 23,653.09
j
43.644.66 2,266,126.02
190.95
685.195.16j 686.386.11 1,623,384.5711 742,597.06 880,787.51
Stat
T~~~fr~~:~:uct~~n
e Forcrs and Ma-
~~~~:~~:~~~~=12.08
I$6,325,273.:I~~~~6~95.
a:~~-
374-~2~-I$-~.~3~.:6:11
~~~~3-.:~~
~~7~:;~~:~~~~~~~~~~.
$-~:.7~9~7.:
terials .. _______ -~~400 !)[)~~~~ --~9.400 991--/'8~3~~ -~~9();)~~ __ 972, 145~31)1 _9HJ,336~3_1, _ __594 ,200.~ ~~~~~ _ __ii94_:200.34
Total Construction $3,490,562.45 ~3 ,564, 112.081$7,0,14,674.53 $1!, 147,085.91 $ 53, 183. 97Cr.ISIO, 53,1, 842.211$10,482,558.241$ 7, 719,102.20 $ 3,371,103 .87 $ 4,34 7, 998.33
Surveys..~-.------------
lleconstructwn__________
56,~03.27:-------------1 56,30~27 10,147.15-------------1
1 1
10,741.151
I 213,762.72 , 320.8!Cr.
659,560.75 14,,227.61
210,40?.30 245,103.97
2)0,088.4U 3.12.3,{1.58
~U,977.501--------------
2,7,976~92 --------------
59,977.50 277,976.92
Maintenancc(Sch.?\o.6-A) 46,132.491-------------~ 46,132.491 1,175,724.84 10,256.21
1,137,732.83 1 1,147,989.04
7:3,868.29--------------
7:3,868.29
~~d~~~~~~".;rii;,[~~ctir;g
65,317.73 _____________
65,317.73~-------------- --------------~
2,77s.ool
2,775.00
52,542.73 ______________
52,542.73
I I I Certificates.. .......... -------------~~~~:..::.:__ _2,66~~.5_:~2 ~~-~.:.:_::~l __::_648,'/(i.5_:~l_2,648,_765.80
11,819.32 --------------
11,819.32
1
Total Continuing AI-~
lotments _________
~~9~I!~~~~~~~I~~~~
~~9~:!j '~~~~
$14,884.608.'_5/~~!J!
!c~~
!,~
STATE HIGHWAY BOARD OF OEi>ROIA
SUMMARY OF ALLOTMENTS AND FUND BALANCES; ALSO, REFLECTING RECONCILIATION WITH EXPENDITURES JULY 1, 1935 TO JUNE 30, 1936
DESCRIPTION
. 1
Net
Estima-ted 1
-------N-et-
Fund Balances Participation 1Fund Balances 1 Allotments
Encum-
Expenditures
I July 1,1935 1 July 1,1935 July 1,1935 I
Non-Continuing Allotments-~,-- - - -~--
--I
--.- -- -- -
brances
I Ad(m~cihn.if'Ntraot..iloin-B)_ . ___
Hescarch (SelL No. G-Il) __
-j
I
_f
__ $228,887.0.1 Sl..l41.!11rr.l$
71i.10
25:LG9Cr.
Collection of Rl'nnue (Sch. No. li-B)___ ____
Quarry(i'ch. Ko. G-ll)__ _
E'!Uipment(~ch. ~o. 6-C)
Shop_______________ _ 1-
Motor \'chicle Lieense
Tags_______
---)-=--=__:_-__::_--_::__
-I
--
1_ 1
42.181..\'1 1,420.1\1 1 ll, 758.0.1 1 128.1i7Dr
.Si. 822 .1::;
I
. ns
71lli. ~s I 128 li7Cr.l
I
42' 181.5()1 1 '41\l. 241
11. 1),\1.251 -I
57 822./:11 I
Total
', Fund Balances
Charges
June 30, 1936
228,887.05 IIi. 10
42, 181.5!1 1.420. 1\1 11. 7.58 .IJ:l 128. fiiCr .1
5,. s2:z. 1::; I_
1 - Estimateil-~ - N e t - -
Participation Encumbrances June 30, 1936 1', June 30, 1936
1--'
Total ing
A\Nlootnn-wCnutn~t-i-nu_-,
_
1
g; -:\d Fund Balances, July 1, 1=-=-
_ __ I__
I
1.~ :)4:2 017 02
1
$
. 2lfi.;)4C'r. ~~
I
:Jn 2Ti ..Iii $:il2 '017 .02
I
I~
I
1G35__________
__ $:l.(iliU.063.6!1
I
I
,- = ===c c='
I
Estun,ltcd Partlmpahon, .Tul) 1, PJ:35 ---- !~~~,!;-==~~~
1
I
I
Fund HaLtnCeR, July 1, 1()35
__ _
_ ~~~'~' ~~~771
I
,\llotnwnts for Year-Exhibit "B" _
- - - - - $16,198, 736.:Hil
I
i'~ncumbr::mccs fur Yrar, N ct EnrumbraJtec~_ ~
10:?' 762. \01
ExpenditmeR for Yrar -Exhibit "C" _____ _ Total Charges for Year_ ________ _
__ 1$15, 12:3 RG2 67,
-- i$~?2-=t1,ti?.1 ~ 7
Fund BahncPs, .June 30, 19.16____ _
8. 20.\, 281i. !Iii
Estimated Participation, June :w, lU:HL _______ _
Net Fun(i Balances, JunP :30, U..n6 ____ _
Add Un1iqu!dah'd Purchase Onlcrs, ete ____ _
4,834,18:J.OG 261,620.65
Total Fund Balances, State Liability, June 30, IU31\-Exhihit "A" ___ _
5,095,803.74
Districts
STATE HIGHWAY BOARD OF GEORGIA DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY
UNITS AND CONGRESSIONAL DISTRICTS JUNE 30, 1936
Schedule No. 6-A.
!
Unencumbered~ Allotments July 1,1935
I
Allotments
I
Net Encumbrances i Expenditures
I
SUMMARIZED BY DIVISION UNITS DIVISION NO. 1
I Unencumbered
Total Charges Allotments
1
June 30,1936
I
57,067.45
103,481. 88 68,697.47 153,939.29
38,369.09
:---
421,555.18 $
1,765.28 3, 131. 55 1,146.57 2,902.18 1, 904. 350r.
7, 041. 23
48,219.97 $ 49,985.25 $ 6,342.18
97,156.83
100,288.38
9,990.40
56,859.70
58,006.27
10,888.40
148, 105. 10
151,007.28
7,019.90
37, 641. 96
35,737.61
2,666.21
---
387,983.56
395,024.79
36,907.09
2-L __________ __I$ 2, 405.97 $
2-3 _____________ 1 4,881.49 2-4 _________ --- 3,770.34
~=~~~~~~~=~=--~~~ 3.~g~:~g
~=i~========= __ ~~~:g~ I1_____ 1
$ j$ Totals___ __ 16, 005. 19 1
55,234.77 32,000.78 72,148.86 78,084.42 6,195.54 86,461. 94 81,865.92
411,992.23
DIVISION NO. 2
2, 190. 59
i
$ 1
52,762.35
1$
54,952.94
1$
1, 619. 430r. j 773.21
2,610.33 1 155. 76 .
31, 521. 28 I 71, 831. 66 78,908.49 5,667.39 I
29, 901. 85
72,604.87 81,518.82 5,823.15
I'
I I
;-----; 3,478.87 I
4, 935. 230r. 1
84,077. 30 84,658.28
I
' I
87,556.17
I I
79,723.05
I I
-----'-------
2, 654. 10 1$ 409,426.75 $ 412, 080. 85 $
2,687.80 6,980.42 3,314.33
398. 90 477.09 651. 910.R. 2, 709.94
15,916.57
STATE HIGHWAY BOARD OF GEORGIA
Bchedule No. 6-A-Oont.'d.
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY
UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1936
Districts
Unencumbered
Allotments July 1,1935
Allotments
Net Encumbrances
Expenditures
Unencumbered Total Charges Allotments
June 30,1936
33--45__-_-_-__-_-_-_-_-_-_-_-_- $ 3-6 _____________ 3-7 _____________ 3-8 _____________ 3-9 _____________ 3-10 ____________
352. 14 402.99
1,773.61 6,907.76 2,423.18 7,053.64
837.28
Totals______ $ 19,750.60
Totals______ $ 46,132.49
$ 8,063.72 21,099.94 14, 341. 64 82,069.26 90,051.68 117,671.98 8,879.21
$ 342,177.43
$ 1,175,724.84
I
DIVISION NO. 3
$
12.38 $ 8,097.90
186.97
20,948.49
179. 320r.
14,382.90
525. 540r.
79,579.23
219.37
90, 631. 24
823.66
118,296.31
23.36
8,386.45
$
560.88 $ 340,322.52
$ 10,256.21 $ 1,137,732.83
I
I
I
$ 8, 110.28 21,135.46 14,203.58 79,053.69 90,850.61 119, 119.97 8,409.81
$ 340,883.40
$ 1,147,989.04
$
305.58
367.47
1, 911. 67
9,923.33
1,624.25
5,605.65
1,306.68
$ 21,044.63
$ 73,868.29
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 6-A-Cont'd.
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY
UNITS AND CONGRESSIONAL DISTRICTS
- - - - - - - ~===
---~
~~--
JUNE 30, 1936
Districts
1
Unencumbered I Allotments July 1,1935
Allotments
Net
.
,
1 Encumbrances I Expenditures Total Charges
Unencumbered
Allotments June 30,1936
1
SUMMARIZED BY CONGRESSIONAL DISTRICTS
1--' _1_______-_-----c-1-$--1.-6-65-.-9--5---cl-$--11-2-.302.22 $1
&:: 2_ ___ ______ _ 6, 796. 90
103. 481. 88
3_____ 4________ 5_______
1 5,078.69 4,122.48 402.99
100,698.25 80,212.58 21,099.94
6______ 7__________ 8__________
5,606.91 6,907.76 2,527.88
92,426.06 82,069.26 96,247.22
9 __ -10_
7,053.64 1,279.60
117,671.98 95,341.15
11_ -----------12_
4,087.89 601.80
153,939.29 120,235.01
Totals._ _,$46,132.49- $1,175,724.84-t
3, 955.87 $1 100,982.32 1$- 104,938.19 :$
3. 131. 55
97. 156. 83 . 100. 288. 38
472.860r.
88,380.98
87,908.12
785.59
79,929.56 1 80,715.15
186.97
20,948.49
21,135.46
2,431.01
93,291.39
95,722.40
525.440r.
79,579.23
79,053.79
375.13
96,298.63
96,673.76
823.66
118,296.31
119,119.97
"'-!' 3,502.23
2,902.18 6,839.580r.
92,463.75
148,105.10 122,300.24
95,965.98
151,007.28 115,460.66
10. 250. " $1,13,. ,,,:8,- $l,i47,9so.
9, 029.98
9. 990. 40 17,868.82
3,619.91 367.47
2,310.57 9,923.33 2,101.34 5,605.65
"' 654.77 7,019.90 5,376.15
868.29-
1
1
1
STATZ HIGHWAY BOARD OJ' OBOB.OIA
acbMule'Ro.e-'B.
DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30, 1936
1
Junencumbered 1 Allotments
1 July 1,1935 !
1
Allotments
Net
,
Encumbrances I
I
1 Unencumbered
Expenditures Total Charges \ Allotments
_______
June 30,1936
GENERAL ADMINISTRATION ALLOTMENTS
G. 0. _ __ _
Mtnc. Claims __ _ Const. Claims___ .. Other Claims __________ _
--- $
I
175,650.15 6,628.62 2,866.25
746.80
GENERAL OFFICE
;,76 I' I, -~
600,
177,126.75
6,628.62
2,866.25
I
746.80
1 .-~- 175, 650. 15
6,628.62 2,866.25
746.80
Totals__ _
- - - - - ~-----
-
. - -- 1$ 185, 891. 82 $
1, 176. 60Cr. '$ 187,368.42 !$ 185, 891. 82
11
WAREHOUSE
Totals_____ -I- ____ _
13,580.35
\$
33.03 1$
I
I
I
DIVISIONS
13,547.32
13,580.35 1------------------
Div. No. L____ ______________ I$
9, 608.10 $
61. 57Cr. $ 9, 669.67
2------ ------------3__ ___ __ ______________
9, 382. 01 10,424.74
6. 74 i 43. 51Cr. \
9, 375. 30 10,468.25
-------- ------------------- --
Totals___ --~---- ____________ $ 29,414.88 $
98. 34Cr. $ 29,513.22
1-------------------
Totals___ _ ~~~~~ $-228, 887. 05- $--1, 54U1ili.l-$-Z30, 428. 96
---
~------------------
,--
1
-
~~~-~~~~
Schedule No. 6-B-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30, 1936
Unencumbered! Allotments
! July 1,1936
Allotments
Net
j
I
I Unencumbered
I Encumbrances Expenditures Total Charges
Allotments June 30,1936
OTHER ADMINISTRATION ALLOTMENTS RESEARCH & ANALYSIS
Analysis ______ -I- ______________ -I$
,.... Research ______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
266. 43DrI$ 342. 53
266. 43Cr. __________________ $
12.74 $
329.79
1
~
Totals ______ l====~-$---7-6-.1-0--~-$----2-5-3.-6-90-r-. $
329.79 $
266. 43Cr. 342.53
76. 10
Totals______ ----------------~
I
COLLECTION OF REVENUE
42, 181. 59 1----------------- -I$ 42, 181.59
1,420.19 1$
QUARRY . 95
J
i' 1,419.24
42, 181. 59 1------------------
1
1,420.19
[-----------------I
STATE HIGHWAY BOARD OF GEORGIA DETAIL OF EQUIPMENT UNENCUMBERED ALLOTMENTS
JUNE 30, 1936
Schedule No. 6-Cl.
Unencumbered I
Allotments
Allotments
July 1,1935
Net Encumbrances Expenditures
Unencumbered
Total Charges Allotments June 30,1936
Ad~in:~~[~~~~ -$-~5. 68---$----:1.02---$--2,664. 66--$
... ~~~~~r._ :::i: :::::::::::-:: ~J~~: ~~ ___i~: ~~-- ~: ~~~: ~~
2,765.68 1--5,697.28
3,295.07
::':
Totals ______ !_ __________ ___ $ 11,758.03 $
706.78 $ 11, 051. 25 $ 11,758.03
1
=========:======-=-~-
I
STATE HIGHWAY BOARD Of GEORGIA MAINTENANCE APPROPRIATION JUNE 30, 1936
Schedule No, I!.D
APPROPRIATION For Fiscal Ycar I 935-:36
DEDUCT: Cnallotted Appropriation Balance at .Tune 30, 1936-Ciosed into :Surplus _____ _
$ 1,200.000.00 14.480.14
Availablc for Allotments ____ _
DEDUCT: Allotments for Year Maintenance, General Division No. l_ _________ _ 2_____ ----------------------3 _______________ -------------
$ l.l85,519.SG
421,555.18 411,992.23
s 342.177.43 1,175,724.84
Maintenance Administration Compensation Claims ______ _
Maintenance Equipment_------------------Shop ______________________________________ _
Less: Shop Billings _______________________ __
202.271.66 202,500.33
6.628.62 3.29.5.07
128.67Cr.
Total Allotments __ --- ___ -------- __ ----- ________ --- ______ ---------------.. $ 1,185,519.86
Appropriation Balance, June 30, 1936 ________________ _
0.00
142
STATE HIGHWAY BOARD OF GEORGIA ADMINISTRATION APPROPRIATION JUNE 30, 1936
Schedule No. 6-E
Af'I'ROPRIATION
For Fiscal Year 1935-36 ----------------------
DEDUCT: [nallotted Appropriation Balanre at June 30, 1936-Closed into Surplus ________ _
$500' 000.00 234' 063.69
Avaihlblr for Allotments
IJEDUCT: Allotments for Year General Administration Division No.1_ _______ _
3 ____ -------------------------
9,608.10 9,382.04 10,424.74
Total Divisions ____ -- ______________________________ $ 29,414.88 General Office_ ---------------- _________ $21l9, 509.17
Less: BluePrint Billings _____ ------------ 93,859.02 $175,650.15
$265,936.31
Compensation Claims __ ---------------- __ Warehouse ____ ---------
3,613.05 13 '580. :35 $222. 258 .43
Other Administration Allotments Research and Analysis _________ -----------Less: Test Billings _______________________ _
$ 26,824.73 26' 748.63
76.10
Collection of Hcvenue ______________________ _ QuarrY------------------------------------
42,181.59 I ,420.19
Total Allotments _____________________________________________ _ __________ $ 265,936.31
Appropriation Balance, June 30, 1936 ___________________________________________________ $
0.00
143
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ESTIMATED PARTICIPATION; ALSO REFLECTING RECONCILIATION WITH REVENUE RECEIPTS
JULY 1, 1936 TO JUNE 30, 1936
Schedule No.7.
Estimated Participation
July 1,1936
Fund Revenue Accrued
State Treasurer
Motor Vehicle Fees_ Fuel Oil Tax _____________
_ ----- ---
----- -----
---
-
-------------
------- ---- $
--- -- ----
......
:1::
Total State Funds ____ _------ -- --- ----------- ------ 1$
1,392,012.38 10,404,393.81
11,796,406.19
U.S. Government
National Recovery Projects _____ ------$ 3,520,347.71 $ 1,336,978.16
Works Program Projects __ -------------- ------------------
1,147,576.33
Other Federal Projects___ _------ ---- ---
23,653.09
1,046,442.72
--( Total Federal Funds_ ---------
3,544,000.80
$ 3,530,997.21
I
Revenue Receipts
Estimated Participation
June 30, 1936
$ 1,392,012.38 10,404,393.81
$ 11,796,406.19
$ 3,038,813.82 354,522.20 327,498.75
$ 3.720,834.77
------- ------------
------- ------- ----
--- ----------- ----
$ 1,818,512.05 793,054.13 742,597.06
----
$ 3,354,163.24
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ESTIMATED PARTICIPATION; ALSO REFLECTING RECONCILIATION WITH REVENUE RECEIPTS
JULY 1, 1935 TO JUNE 30, 1936
Schedule No. 1-0ont.'d.
Estimated
Estimated
Participation
Fund Revenue Revenue Receipts Participation
July 1,1935
Accrued
June 30, 1936
- - - - - - - - - - - - - - - - - - - - - - - - - - - -------~--- - - - - - - - - - - - - - - - - - - -
Other Construction Funds
I
Counties~Cash for Construction~
Prior to Refunding Act _______________ $ Railroads, Counties and Cities, Cash
12,215. 50Cr., ______ _ ------------ --- ----------------$
12, 215. 50Cr.
for Construction__ ___________________
31, 984. 01 i$
6,124.35 $
9,124.35
28,984.01
Railroads, Counties and Cities, Con-
tracts for Construction_____
342. 77
49. 23Cr.
121. 42
172. 12
Total Other Funds _________________ $
20, lll. 28 $
6,075.12 $
9,245.77 $
16,940.63
Miscellaneous Income____________ ____________________________ $
1,442.13 $
1,442.13
Estimated Participation, 7-1-35 ___________ $ 3, 564,112.08
Fund Revenue Accrued _______________________________________ $ 15, 334, 920. 65
1
3 :::i::::::e:~:~~~~~~.- ;-~~~- _ ~~ _~~~~~--- ___________________ -~-- __________________ $
15, 527, 928. 86
Exhibit "A" _________ --------------------[-- _________ ---------[------- _________________________________ $
3,371,103.87
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936
Schedule No. 8
OBJECT OF EXPENDITURE
Analysis (Schedule No. 8-A) A!:::~s-
Analysis (Schedule No. 8-Bl
Construction
Analysis (Schedule No. 8-C)
IAnalysis [cs~~:~~:: (Schedule 1 No. 8-E) No. 8-Dl I Legislative
Maintenance Equipment Transfers
Redemption of Debt
I Total
MEMORANDUM
Net
------ -- -
- r
Expenditures I
Net
! Inter-Depart-
Gross
I Expenditures men=~~i~gs l_:nd::~
Personal Services ................ ;~70,016 25 --;-;~~~; 9~ ~2, 720 ;1- - -~~~=~~-
Equipment Expenses............. 3,354.77 208,258.81 1 423,3(>7 41' . . . .. . . . .....
~ ~~~::~;~ta~~~c~:::;;;~-----~~::::: ...l0,7:l5 08 3,123.23 8,.508-GliS11 '0~~-~~~-
$1,440,442 73 ;1~4~~~:;-~3~
034,980 !l!l
~~:~~~i ~~
034,980
~~:~~~
9~H~'1
163,724 08 $1,604,166 81 4 849 981 639,830.97
860 l21, ~~:~~~ ~!
Heat, Light, Power and Water.... 2,560.07
3,6.51.1i5
1,103 33!
7,315.05
7,315 05j
2,1i22 82: 1 9,937.87
R.ents.. ________________________ l!
Traveling Expenses .. ____________ Supplies and Materials...........
3,638 401
39,511 75. 11,931 41
2,248.32
77,493 52 51!1 3'14 77
ll,113.3:l 1
I
20,650.16 .:.::: :::::--::: ::----------
244,055.83 ___ . _ __ ___ . . ____
12.000.051
137,1i55 43 770,:382.01
1 70 38 01 ~31;2,,.01i0a0~ 04:5<. _
52.00
5,448 IIIli
143,020.97
r12,052.05
143,104 39 913,408.98
Insurance....................... 2,42(> 17
3,559 19
14,83b 36 .... ........
20,821.72
20,821 72
496.3:3
21,318.05
1 ______ 1 1 1 1 ir:~~:!;i~;:~~~~~:-~~~~~~:t~~-~t'-::' ~:;~~ ~!1 98 53 --------~295 _::::::--[::-- -[:::::::::::-- ~-.~~~ ~! ~::~~ ~~~~
--------1 PaymentstoC~ntractors.........
9,170,408 84
1,000 00.. .. . .. . ..... ....
9,171,408.84 9,171,408.84..
"421' 1~:~~! ~!
9,171,408.84
~;!~i:~:"~~;:~:;l~~~:~~s-E~-p-e;,~,~f--2:895 39 ~--15o:~~~ ~~- 408-~ ~::::~j~~:.;;7 ~ ~~:~:: 8t2~~~::~~~~~~- 2~;~~~~- __z.o~o ~~-~~~:~~~ :~
_______ I
I ~-------~
I ~~~~~~2~1~7~2:~107~~8i$1.5_.446.9!0_65
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936
Schedule No. 8-Cont'd.
OBJECT OF EXPENDITURE Tota! Administratirm-Exhibit
Analysis (Schedule No. 8-A) Adminis-
tration
Analysis (Schedule No. 8-BI Construction
I
$2i4,359 58
Analysis
Analysis
Analysis (Schedule
I (Schedule (Schedule No. 8-E)
No. 8-Cl
No. 8-Dl Legislative
Maintenance Equipment Transfers
I
>-'
~ Total Construetion-Exhibit ''C'' _______ _
--:-~S10.74G,251 51
Redemption of Debt
Total Net Expenditures
MEMORANDUM
Net
Inter-Depart-
Gross
Expenditures mental Billings Expenditures
Total Maintenance-Exhibit ''C''
$1,382,831i
Total Equipment--Exhibit "C"
,051.25
Total Legislative Transfers-Exhibit "C"
$110,.5\17 73'
Total Redemption of Debt-Exhibit "C".
Total Expenditures- Exhibit "C".
. ................... [~5_-123~8(l~_G7
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATIVE EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936
Schedule No. 8-A
OBJECT OF EXPENDITURES
General
Inter-Depart- Net General Research and Inter-Depart-
Net
Collection of
Total Net
Administration mental Billings Administration Analysis mental Billings Research
Revenue
Quarry
Expenditures
--------------]-----]-----~ 1 - - - - - j - - - - - ] - - - - - ] - - - - - - - ~--- - -~-~-
Personal Services_____________________ 229,835.53
82,820.31 147,015.22
18,094 59
18,063.99
30.60 $ 21,570.09 $ 1,400.34 170,016.25
Equipment Expenses__________________
3,150.20--------------
3,150.20
1,162.88
971.21
191.67--------------
12.90
3,354.77
Communication Services_______________
16,442.03--------------
16,442.03
11.43
11.43--------------
293.05 __ -----------
16,735.08
Heat, Light, Power and Water_________
2,560.07 --------------
2,560.07
818.63
818.63 -------------- -------------- __ -----------
2,560.07
Rents_______________________________
3,638.40 --------------
3,638 40-------------- __ _ _ _______ ----------- -------------- --------------
3,638.40
:;;: Traveling Expenses_______
19,277.30--------------
19,277 301
2,839 16
2,839 16 _________ ----
20,234 45 ______ -------
39,511.75
oo Supplies and Materials__ Insurance___________________
17,873.20
11,038.71
2,372 17 _________
6,834 49 2,372 17
2,030 03 63 38
1,969 11
60 921
63 38~1 --------------
36 00--------------
48 00
6 00
6,931.41 2,426.17
~~~~:~:~:~~,:~1~:::~~::~~~:~,~,:-:-~-- 3~:::::.:::::::~::~~9-~:-$-~ ,:~:~, ,:~:~1 .~::1. "'"'""IE;.~~- ': : : Printing, Binding, P,Ihlicit_l', etc________
8,705.34--------------
8,705 34
6 42
6 42 __ ----- __ _ ----------- __________
8,705.34
Total Administrative Expenditures-Exhibit "C" ______________ -------------- __ -------------------------------- _______ --------------------------- __ ---------- -~=$==27=4=,=3=59=.=5=8
Schedule No. 8-B STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF CONSTRUCTION EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1936 TO JUNE 30, 1936
Surveys
Construction
Total
Object of Expenditure
Expendi-
Actual
Plans I Total Supervision! Direct
Total
tures
Personal Services____________ $ Equipment Expenses ________
79,417.68 ------------$ 79, 417. 68$ 314, 175. 19 $ 2,253.96 ------------ 2,253.96 3,378.89
Communication Services____
121. 95 ------------
121. 95 l, 180.73
1H1eeantt,sL__i_g_h_t_,_P__o_w__e_r__&__W__a__te_r___ Traveling Expenses __________
----
--------- ------------ --- ---- ---
49.00 -------------
49.00
10,863.85 ------------ 10,863.85
3.87 617.31 63,998.21
Supplies and Materials ______ Insurance ___________________
-
2, 981. 76 ------------ 2, 981. 76 13,498.36 ---- ------- ----- ------ ------------ -------------
Printing, Binding, Publicity,
214, 113. 03 $
202,625.96 1,820.55 3,647.78
1,582.01 2, 631. 46 502,914.65
3,559.19
528, 288. 22 $
206,004.85 3,001.28 3, 651. 65 2,199.32
66,629.67 516,413.01
3, 559. 19
607,705.90 208,258.81
3,123.23
3, 651. 65 2,248.32 77,493.52
519,394.77 3,559.19
Etc._----------------------
98.53 ---- - -----
98.53 ------------- -------------- ----- --------
98.53
Payments to Contractors ___ Special & Misc. Expenses ____
- - - - - . - - - - - -
--
21,406. 66$
--- ---- - ----- ------- ---------- 93,215.91 114,622.57 30,337.02
9,170,408.84 5,349.16
9,170,408,84 35,686.18
9,170,408.84 150,308.75
-~---~-
Totals ___________________ $ 117, 193. 39 $ 93, 215. 91 $ 210,409.30 $427,189.58 $10,108,652.63 $10,535,842.21 -- ----------
Total Construction Expendi-
tures-Exhibit "C"________ -------------- ------------ ------------ ------------ -------------- -------------- $10, 746, 251. 51
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF MAINTENANCE EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936
Schedule No. 8-C
OBJECT OF EXPENDITURE
GENERAL MAINTENANCE
RECONSTRUCTION
SHOP
- - - - ______ ,_ _ _ _ _ - - - - - - 1 - - - - - - - - - - - - - - - - - - - - - - -
Supervision
Direct
Total
Supervision Direct
Total
Shop
Inter-
Net
Departmental Shop
Billings
Total Net
Expenditures
Personal Services ___________________ $ 31,776.28 576,264.04 608,040.32 1,394.19 $ 53,286.07 S 54,680.26 $ 62,839 78 $ 62,839.78------------
662,720.58
Equipment Expenses________________
182.60 396,942.23 397,124.83
1.00 26,241.58 26,242.58 3,878.77 3,878.77------------
423,367.41
Communication Services_____________ ~ Heat, Light, Power and 'Vater_______ 0 Rents_____________________________
Traveling Expenses_________________
Supplies and Materials______________
6,026.53 57.60
577.50 13,971.72 1,987.77
2,444.77 1,036.27 4,664.56 5,236.09 80,684.71
8,471.30
11.50
1,093.87------------
5,242.06------------
19,207.81
835.45
82,672.48
24.79
25.81 9.46 871.27 606.90 161,358.56
37.31 9.46
871.27 1,442.35 161,383.35
848.69 1,804.19
52.00 2,609.801' 130,019.15
848.69-----------1,804.19------------
52 00-----------2,609.80-----------130,019.15------------
8,508.61 1,103.33 6,113.33 20,650.16 244,055.83
Insurance__________________________
180.00
14,656.36
14,836.36 ------------ ------------ ------------
432 95
432.95 ------------
14,836.36
Printing, Binding, Publicity, etc______
2.24
Payments to Contractors ____________ ------------
Special and Miscelhncous Expenses__
32.36
1.20 1,000.00
8.00
3.44
3.68
5.83
9.51 ------------ ------------ ------------
12.95
1,000.00 ------------ ------------ ____________ !____ ------- ------------ ------------
1,000 00
40.36
427.88 __________ _
427 88~-
15 00
15.00------------ --~8__~
TOTALS ______________________ $ 54,794.60 $1,082,938 231 $1,137,732.83
2,698.49 ~=-=2_:_~:_~~ $245_:_~3_9j $202,500.33 $202,500 331 ____________ --------------
Tom' M~oo E.,oW'"" E.hlhl' "C"-------- ____ ___ ____ _ ___ ____________ ---- ___ 1___ ___ ____ ____ ____ ___ ___ _ __ ____'___________ ! ______ ::_:~-~;"i;O"io
Schedule No. 8-D
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF EQUIPMENT EXPENDITURES, BY OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936
. ~I I
======;===
Total
Object of Ex- Adminis- Construe- Mainte- Expendi-
penditures
tration tion
nance
tures
- - - - - ---~- - - - - - - - - - - - - - - - - - -
::--Tractors _ - -
----1$ 2, 118.97-
----- $ 2, 118.97
----- .$ 2, 575. oo 2, 575. 00
Road Machinery, Misc. :
1, 132. 561
207. 81 1, 340. 37
Office Eqmpmell:t _ $ 1, 160. 79
33. 35 _
1, 194. 14
Engineering Eqmpment _ _ _ _ ___ _ 1, 241. 90
I
2, 318. 90 ____________
3, 560. 80
Laboratory Equipment 261. 97l - ___ - -]- __ - ______
261. 97
- - - - - - - - - - - -------~------
Totals_____ _____ $ 2, 664. 66 1$ 5, 603. 78.$ 2, 782. 8L __________ _
[====' == ==1=----
Total Equipment Expenditures-Exhibit "0"______ $ .11. 051. 25
1
Schedule No. 8-E STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF LEGISLATIVE TRANSFER EXPENDITURES
BY OBJECT CLASSIFICATION JULY 1, 1935 TO JUNE 30, 1936
Object of Expenditure
I Motor
Convict
Vehicle
Farm
Total Expendi-
License
tures
Tags
- - - - - - - - - - - - - - - - - - - - - - 1 - - - - - - - - - - -
Special & Miscellaneous Ex -1
I
penses Transfer of Funds ____ $ 57, 822. 73$ 2, 775. 00 $ 60, 597. 73
Totals
____ ~~y7,~~~~$-2,775.00 - - - - - -
Total Legislative Transfer Expenditures-Exhibit "0'- - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - -- - - - - - - ----- -- $ 60. 597. 73
151
Schedule No. 9. STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF EXPENDITURES BY CONGRESSIONAL DISTRICTs
JULY 1, 1935 TO JUNE 30, 1936
==--
(Analysis) (Analysis) (Analysis) (Analysis)
(Schedule (Schedule (Schedule (Schedule
Total
- - Dis- No. lO-B) No.lO-C)
tricts Construe- Surveys tion
No.lO-D) No.lO-E) Mainte- Recon-
nance struction
Expenditures
No.1 $ 1,129,438.22 $ 14,260.92 $ 100,982.32 $ 20,546.34 $ 1, 265, 227. 00
2
712,579.08 16,242.30 97,156.83 12,539.20 838,517.41
3
833,148.87 12,026.31 88,380.98 49,428.32 982, 984,48
4
674,145.77 16,084.38 79,929.56
238.19 770,397.90
5
649,353.69 25,099.10 20,948.49 2,655.58 698,056.86
6
874,513.55 17,221.07 93,291. 39 22,678.33 1, 007, 704. 34
7 1,088,019.90 20,787.53 79,579.23 55,927.73 1, 244, 314. 39
8
660,977.80 9,755.33 96,298.63 2,773.01 769,804.77
9
773,551.35 23,778.37 118,296. 31 1,185.41
916, 811.44
10
360,108.46 13,892.14 92,463.75 7,025.79
473,490.14
11 1,054,201.20 19,375.32 148, 105. 10 45,973.83 1,267,655.45
12 1,725,804.32 21,886.53 122,300.24 24,132.24 1, 894, 123. 33
-----
Totals $10,535,842.21 $210,409.30 $1,137,732.83 $245,103.97
Total Expenditures Distributed by Districts' ___________ $12, 129, 088.31
Undistributed by Districts Adrninistration General Office _____________ $187, 368.42
Warehouse_--------------- 13,547.32 Divisions ___________________ 29,513.22
Research__________________
329. 79
Collection of Revenue_____ 42, 181. 59 Quarry____________________ 1, 419. 24 $
274, 359. 58
Land,Buildings&Equipment Legislative Transfers
Prison Farm Purchase_ ___ 2, 775. 00
MotorVehicleLicenseTags 57,822.73
11,051.25 60,597.73
Redemption of Debt Refunding Certificates____
2, 648, 765. 80
Total Expenditures Undistributed by Districts _________ $ 2, 994,774.36
Total Expenditures-Exhibit "C" _______________________ $15, 123, 862. 67
152
Divisions
(Analysis)
(Schedule No. lO-B)
Construction
Div. No. L ____ $ 3,310,587.03 2_____ 3,865,253.97 3_---- 3, 360, 001. 21
Totals_____ $ 10,535,842.21
ST.A.TB mGBW.A.Y BO.A.B.D o:r GIIOB.GIA
llohedule 11lo.10.
SUMJII.AB.Y OF EXPENDITURBS BY DIVISION UNITS
JULY 1, 1936 TO JUNE 30' 1936
(Analysis)
(Analysis)
rAnalysis)
(Analysis)
(Schedule
(Schedule
(Schedule
(Schedule
No.lO-C)
~o.lO-D)
No.lO-E)
No.lO-F)
Total
Surveys
Maintenance Reconstruction Administration Expenditures
------
$
61,063.97 $ 387,990.15 $ 126,317.61 $
9,669.67 $ 3,895,628.43
62,769.91
409,420.16
58,535.39
9,375.30
4,405,354.73
86,575.42
340,322.52
60,250.97
10,468.25
3,857,618.37
- - --~------
-----~~~~-
$
210,409.30 1$
1,137,732.83 $
245,103.97 $
29,513.22
Total Expenditures Distributed by Division Units_ - -------- --------- . ---- ------- ----- -------$ 12, 158, 601. 53
:;; Und1stnbuted by Dlv.is.wn Uruts
w Administration General Office_________ ______ __ _________________________________ $
Warehouse ______________
______________________ _
Research______________ ____ . ______________________________ _
Collection of Revenue__ ___________
_______________________ _
Quarry ____________________________________________________ _
187,368.42 13,547.32
329.79 42, 181. 59
1,419.24 $
244,846.36
Land, Buildings and Equipment __________________________________ _
Legislative Transfers Prison Farm Purchase ___________________________________________ $ Motor Vehicle License Tags ____________________________________ _
2,775.00 57,822.73
11, 051. 25 60,597.73
Redemption of Debt Refunding Certificates ______________________ _
2,648,765.80
Total Exp.mditures Undistributed by Division Units _____________________________________________________ $ 2, 965,261.14
Total Expenditures-Exhibit "C" ------------ ______ .. ______________________________________________________ $ 15, 123, 862. 67
UNIT
Schedule No. 10-A.
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF ADMINISTRATION EXPENDITURES BY UNITS
JULY 1, 1935 TO JUNE 30, 1936
Personal Services
------~-----,~~~~~------====~----
!
I Communi- Furnishing!
I Equipment; cation Heat,Light,
Expenses Services Power and
Water
Rents
Supplies
Traveling
and
Insurance
Expenses Materials
Printing, Binding, Publicity,
etc.
I
Special lndemni- and Mis-1 Total
ties iI cellaneous 1 Expenditures
i Expenses
~-- - - - - - - - -
GENERAL OFFICE
Commi,iooers --------- $ 30,fiiG.IO, ____________________ ---------- ___
$5,751.79----------.... ---------- ___
$ :lll,:ln7.89
~~~~~~~:;~~~ndc:~;'::..~::::::::::: ~~:!~~ ~~::::::::::: ::::::::::1::::::::__ ---------- 3,~~~ ~~ :::::::___
_______:_:_:_]-_-_-_-_-_-_-_-_-_-_ ~~:~~~ ~~
: : : : : : : : : : ::::_: : : : : : : : : : : : : -: : : __: : : : : : : : : Plansfor Bridges.________________
18,792 90 __________ ---------- _
1
i:~:~~~~;~;:::-:::::::::::::::::::. :~:m ~~~-:::::::::
2,499.50---------- ____
-:;:~;~:~~
21,292.40
:~:i~u~
z~~~~:::~~~~::~-~~~:r~~':::::::::::j--;:;;;-;;],l-$2:;o8.i3 $io:229"45 ;;;:476"47 "i:l:o6o-9o -- i2o-20 $14:o85 23-$1,032 001 3:091 37 $!~:~!! ~~ ;z:4i;5-88 !~:~!! ~:
TOTALS ______ -------------- --;204,873 35 -$~, ;;-;-; ;;0,229 451--;2~:;:;;:;:; -;OliO ; ;;~~~ ;;~08.5 ;; --;~~;-~;r-;;-705 ~~~;~~~ $;~~~;-;~$ 281,22;-~
Less: Blne Pnnt BIIlmgs___________
82,820 31
______
----------
----------
----------
----------
11,038 71
-1-- _
_____
__
---: _ ______ 93,859 02
TOTALS... __________ -------- ~~ 0~ ~2,1~8-1~;;0~2~9 4~ $2,4~6 47 ~3,_0~ ~l$14,60.;-::~~--;0~11 $1,03;-;:--;8,7~5 ~:;;~~~~~~~~~~~~~~368 ~
1
WAREHOUSE_ ______________________ $ 9,915 73 I $ 574 13$
279 94 $
32 oo __________ 1
$
975 351 $1,370 21r
$
21 00
______
l __________
I
l
$
378 01 1 $ 13,547 32
I
I
I
1
I
I
- -- _I____ --
UNIT
~-- DIVI;IONS -
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF ADMINISTRATION EXPENDITURES BY UNITS
JULY 1, 1935 TO JUNE 30, 1936
I
I Communi-1-Furnishlng 1
I ~ II- suPPlies I
I Printing,
1 '
Specia\
'1
1
Personal Eqwpment cat1on Heat,Light,l Rents 1
Traveling 1 and
1Insurance 1 Binding, 1 lndemni- 1 and Mis- \ Tota1 1
-1----1 --- Serv1ces I Expenses Serv1ces I Power and
-~I----- ---~-~ - Water
Expenses I Materials 1
-~ I!
1 Publicity, 1 ties 1 cellaneous Expenditures
1
1
1 Expenses 1
II etc.
1 1
Number One _____________________ $ 4,382.26 . Numlwr Two ____________________ l 4,442 .10 Numhcr Three ___________________ ' __"__2_21 GOj1
SO $2,10\1 28
19.60 $ 577 .50 $l,:l67.:l5 722 841
Sli Gli 2,428 31 _________ I
I 1,128 25 887 921
380.48 J,:l\15 05
32-~i--~~~~--j 1,200 ~ __ 806D5
4Rh 04 401 iili 1 4:31 47
\)' 61\\l. !)7 !l,:l7.1 .:HI 10,46K 2!>
TOTALS . . ~---------------
~ _, 15,046 45: $
I
467 94l $5,932_1).j
511i0 $ 577,50 $3,696.21
-
-~------
1
$2,417 71 $1,31\1.171 _____ _
1
-
I
I
4001 $ 2!1,5t:l 22
....., TOTAL GENERAL
I
0' 0'
Administration _____ ~-~-----
_ $147,01.5 22 $3,150.20$16,442 03 $2,560 07 $3,1\38.40$19,277.30 $6,8:14 49 .~2.372 1] $8,705.34$17,584\15 $2' 848 79: ~2:l0' 428 !i(i
1
1
=--~- -11~4:~.:~ 818~3 =~-~-~ 9---~-6-~~1,91\9 RESEARCH AND ANALYSIS
Diyision of Hescarrh_ ____________
19l.G7 _________
1
$~8-1\3 =-= -;~;~~ ~2 TOTALS._________
____ $ 18,0\14 .1!11 $1, Hi2 88, $ 11 43!
_s_-z_-=_,8_3_-
11 GO.D:2
OlO O.l l
I
(j:) 38
6.42
IJ:l 38 $ ti 421
$2,005 $ 21i.748.1i:J
46 GO
.'32!1. 70
~ - --,-$-2,11;1 !101 27,078 42
Le;,; Test Billings______________ 18,008 U!l 971 21
11.43 818.1i3 __________ 2,83!1 Ill 1 96'1 II
b3 38
6 42 ~---~-j 2,00.1 :Joj 21i.748 G:l
COLLE1C\:~-~~s~~-~-~~~-~~-~-- -----,~ ~-~ ~1 ~--~~-~~ -~:_-~~~~ =--~~ ~-- ~----~~~~ ~~ ~2 _ -~~~~=-- _ _ _ _ u~~~$ -32~-79 _- 30 $
67
1
7,0 1
I . --- 4G
~20,234 1 -~---~,=~~-~--~-- 42~1:1-: Enforcement of Revenue Laws_____ $ 21,570 0\1 __________ $ 293 05 ______
1
=- - -- - T-; -----,- QUARRY ----------------------- ~~- 1,40~;:-.$-;1-;;;; .
~~
-,-------
_
4.\ $
------
:ll\ OOi $ 48.00 ____
-S
-~~-00
~!~~=~~~ ~~~~~~- -~ -;~;;-;~
---
-------~--~-
TOTAL ADMINISTRATION_
2 .m~o11; z:,~3,:4 ":!6.735 o8 $2~5 oo:,~~G:s4oe~:~ 75 $G.!J31 41. $2,426.1i $8,705 :34$17,584 o.1i:2~8~5-3.~l $274,:l,i9 ..s8
--
---~-------
STATElHIGHWAY BOARD OF GEORGIA ANALYSIS OF ACTUAL CONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936
Schedule No. 10-B.
Personal Services
Equipment Expenses
Communi .. cation Services
Furnishing Heat, Light, Power and
Water
Rents
Traveling Expenses
Supplies and
Materials
I
1
I prm. .tmg,
Insurance Binding,
Publicity,
Etc.
!
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
CONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS
District No. )__ _____ I $ 31,143 79i $ 655.80
2_______ 20,834.34 ------------
......
Ol 0>
3 _______ 4 _______
25' 287.461 23,048.93
120 63 205.18
287 751 - -138 251 _________
24.00 80.00
94 42 ---- ---- ---------22 431 -- - --- 161.00
6,951.27 4,870. 72 5,482. 94 5,414 50
, mii
I i
11~ !1 1! El~
5 _______
6.. ____ 7 _______
16,526.58 25,282.09 36,482.46
197.21 193 36 471.38
:; ~~i::::::::::::
138.52 $
3.87
20.00 90.00
2,200 73 5,158.45 6,074.56
699 64 ----------'--- ------------------- 1,481.17 931.57----------- ---------------------- 2,744.441 1,347.75-------------------- -------------- 3,123.47
21,14105 34,326.91 47,732.01
8 _______ g _______ 10 _______
19,686.99 30,669.01 15,274.85
202 18 413.24 65.41
82.33 ------------
31.31
100.45 ------------ ----------
47.79 ------------
89.50
3,576.71 4,373.00 4,206.87
1,239.93 ---------- ---------- -------------814.73 ---------- ---------- -------------658.07----------------------------------
2,087.48 2,169.25 1,426.01
26,906.93 38,539.68 21,768.50
~~~314~1~:;~~-$-3-,;;8-~~-$-1-.-1-80-73-ll-$ :::_:~~:~::_~~~:~:~:_::::/;;:~:; ~~~ ~~~~~~~: 11_______
12 _______ TOTALS ________
26,346 80 43,591.89
173 37 681.13
150.32 ------------ ---
5,532.69
85.75 ------------ 121.50 10,155.77
1,316.98-------- - ---------- -------------- 2,806 541
_ _ _3_.8_7+_---6-17-31 $ 63,998.21 $ 1::::: :: : ___
36,326.70 ::
1==1==-=1=~1=====l===i===l===-=(=-~-=---(=~~-----~1==~1====
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ACTUAL CONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936 -
Personal Services
Equipment Expenses
Communication Services
Furnishing Heal, Light, Power and
Water
Rents
Traveling Expenses
Supplies and !Insurance
Materials
I
Printing, Binding, Publicity,
Etc.
Special \
Payments to and Mis-
Total
I Contractors cellaneous Expenditures
l Expenses
CONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS
"",.....
District No.
L ______ 2 _______
$ 24,732.28 11 '819. 89
$ 24,965.57 I $ 15,177.041
180 961I $
190.23
!.50 $ 150.641 $ 191.07 187 00
-1
3_______ 1,643. 60
928 44 ------------1------------
522.56 $ 57,413.95 $ 418.95 ---------102.78 41,477.51 26.25 ---------19.45 10,043.05 ---------- ----------
4_ ______
5 _______
"-------
13' 718.21 490.31
10,432.38
21,019.10 355.43
9,561.31
254 26: 15.50 68.85
782 17 52.94 613.50
128.00
289 05 36,821.41 229.45 ----------
20.00 ------------ 3,227.60 ---------- ----------
5.00
5.50 31,248.11 229.45 ----------
7_ ______ 24' 800.21 18' 430.68
167.49
8_______ 5,661.19 2,802.02 ------------
613 05 1.00
464.09 25.00
184.15 62,684.76 244.21 ---------27.30 3,595.30 ---------- ----------
9 _______ 10 _______ 11 _______ 12 _______
49,156.20 910.15
39,794.08 30,954.53
40,912.87
209 02
20.25 239 33
2,710.19 ------------ ------------ ----------
30,438.96
314.27
680.17 166.80
35,324.35
419 97
692.13 196.15
270.92 81,895.21
18.85 ------------
527.17 97,979.31 663.73 76,528.44
949.77 ---------181.43 ---------501.11 ---------778.57 ----------
976.786.75 $ 125.80 $1,085,298.96
613' 898.69 998.59 684,069.05
786,829.43 ----------
567' 828.85 977.05
799,463.97 642,047.55
624,050 02
.84 628,212.64
787,567.89 454.65 840,186.64
932,068.23 631.02 1,040,287.89
621 '959 .06 ---------- 634,070.87
560,898.71 459.39 735,011.67
334,519.34 ---------- 338,339.96
846,980.69 49194 1,017,874.50
1,517,021.18 1,209 88 1,663,788.93
l----1.----l----l----l----------------------------------
TOTALS________ $2=14=,=1=13=.0=3'l=$=20=2=,6=25=.=96=l==1=,=82=0=55 = 3,647. 78 $1,582.01 S 2,631.46 $502,914.65 $3,559.19 ---------- $9, !:0,408~~ ~5,349 16($10, 108,652.63
Did;-;ion No. l __
TOTAL~
Schedule No. 10-B-Confd.
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF ACTUAL CONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1. 1935 TO JUNE 30. 1936
Personal Services
~ 1 Communi- Furnishing Equipment I cation Heat, Light, Expenses Services Power and
__! _ Water____,_
Rents
----
---- --
Traveling Expenses
II Supplies and
nsurance
Materials
I, ------
I Printing,]
Binding, Payments to Publicity, Contractors
Etc.
Special
and Mis-
I cellaneous
1
Expenses
Total Expenditures
CONSTRUCTION SUPERVISION BY DIVISION UNITS
I $ 95.017 29
101. zso zo 1
1
1!1,2i770
532.97
1,443 09
1,401 s:l
711.63 ---10.5 06 364 04 $
n 1
$314 175 !9 $ 3,378 89 $ 1 180 $
------1--= --: - - -I -
- --I-=
$ so oo, $ 19,078.50 $ 4,499 49 1~----------1---
. .l$10,185 li:l
390 oo: 27,854 34 1
4,6li0 40. _________ 1 __________ ----- ________ I 10,490.54 1
3 87,
1
141311 17' 065.371 I
4' 338.38 ------ --- ---
I
9 ,G54 .8.1 _______ 1
;-;;-;-";;;/~ ~3.~;;;;~-;~3~498.36 ~~~~~
---~--~~~337.02
130' 700.51 !52' 235 72 144,247 35
427.189 58
Division No.1 _ ---~ $ 50.975 911 $ 42,844.38'
2__ -
77, 462 88 !J7, 28:~ M-l
-~tl741~; _ _(J2,498 05,
TOTALS.
I
I
$214, 113.D:l $202,()25 96
CONSTRUCTION DIRECT BY DIVISION UNITS
512 501 li!G.04
:H/2 01,
I
!.8~~~.r
874 10 2,086.44
687.24
I
398.80 434 791 748 42 1
3,047 78, ~1.582.01 I
781.751 $143,456 111 $ 527.3G ----------~ $2,9:32,111!1.001 $1.490 531 $3, 179' 880 ..52
1 ,:367 34, 208,0.55.1i7 1,8~7.85 ---------- 3,:320.8011.33 2,7ti7.381 3, 71:3,018.25
482.37 151,402 87 1,1[13 98---------- 2,1117,.583 51, 1,091.25' 3,215,753.80
- - - I____
2, li:ll 41i $502.914 65 g3 .55\! 1[1
'
I
- ----
--
'
-!
$9,170,408
I
84
$5.34!1
Iii ' $10, 108,1i52. U3
Personal Services
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936 -
-oolllleMo.1~
Equipment Expenses
Communi- Furnishing I
cation I Heat, Light,
Services Power and Water i
Rents
Traveling Expenses
Supplies I
I Printing,
Speciql
and
Insurance Binding, Payments to and Mis-
Total
Materials
Publicity, Contractors cellaneous Expenditures
Etc.
Expenses
I I - - - - - - - - - - - - - - - - - - - - - - - - - - -
SURVEY ACTUAL BY CONGRESSIONAL DISTRICTS
~ District No
<::11
~
2_______ 3_______ 4_______ 5_______ 6_______ 7_______
ws9_:_:_:_::::li
11_______ 12_______
""' I s 4, "" .45
8,790.81) 3,627.52 2,105.50 4,623.1)7 5,666.10 7,935 09,
4,571.531 10,838.62
li,453.87 8,560.68 11,407.79
80.53 141 34
10.181-13.17--
19 93 112. o3,
14 li2 --
1. ssi
90 03
6.00 ----
198.28 -----------
lI:,:::''~"~"J
159.27
7.59 -------- I
_I
25.01
7.49 --------
670.94 138.34
17.43'._______ ___
___
10 401 __ - ------~-- - -
217.80
15 93 ----
- --------
400.41i
17 5[)
--- ----------,.
924.44 1,015 09
71l0.25 1)09.12 613.19 800 95[ 79.5 Oiil 554. 75 951i 09
1,076 72 1,208 99 1,549 20
203.831 __
268 94, 2:)7 .15 ----
I ___ I
:c::::::l
:1:::::::::
178 091---- I ------1
$4,875.00
145.37 ---- -- $ 7.111 ------------- 14,004.10
324.43 ------ --- __________ :_____________ _ 20!l. 92
258.84- -------- ---------- --------------
123.50
144.24 ---------- 321.32 ____
91 42 ___
1,882 48
19.5 30, ------- ------
-- --------- 311.66
283 541____ ---- - ----- ------------- ------ ---[
420 711 - -- -1---- - ___ ,__ --------- ----------
.5,995 43 10,254 40 4,1i59.47 7,[)65.29 19,489 47 7,199 .liS [),279.35 5,30:J.02 14,778 :lO
8,18ii 29 10,286 94 13,795 7.1
!~----
TOTALS ___ ---~.!2~~~6!=~ 2,253.9G
1;1-~~~-~~---- i ~~-49~~~~ ~0~~63~~! _0~~~ :~:~-~~~- 2~-~ =-~---~~--~~~~~406_6~~~=~~1~~~
-- ---------- - - - ----------
I I I - - - - - - - - - - - - - - - - -
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936
Schedule No. 10-C-Cont'd.
I
Personal Services
I
Communi-
I Equipment cation
Expenses I Services
I
Furnishing I Heat, Light, , Power and
Water
Rents
Traveling Expenses
Supplies
I Printing,
and
Insurance Binding,
Materials
I
------
I Publicity, Etc.
Payments to Contractors
Speciql and Miscellaneous Expenses
Total Expenditures
SURVEY PLANS BY CONGRESSIONAL DISTRICTS
"'1---1 District No. !_ ______________________________________________________ I____
0
2_______ ____________ ____________ ____________ _
I
3_______ ____________ ____________ ____________ ____________ __
4_______ ____________ ____________ ____________ ____
J________-__-_- _[- - __ --_--1~ __1 _ _ ____________
_
_ _
-:-_: -:-: _
_ _ _ _ _ -_-1 -_-_j -:_-_--_____ -_____
$8.265.49 5,987.90
_::::::::r::: ______ :__ I
:-1 - ::::::::::::: :_:::: ::_:::::::
1
_
7.366.84 8,119 09
8. 265.49 5,987.90
7,366.84
8,119 oo
5 _______ ------------ ------------ ------------ ------
- ------------ ------------ ---------- ---------- -------
.5,609.631
5,609.1i3
6_______ ------------ ------------ ------------ ------------ ---------- -------- --- ------------ --
- ---------- ------
10,021.391
10,021.:39
7 _______ -------------------------------------------- ---------------------------------------
------------------------ 11,508.18i
11,508.18
8_______ ------------
- ------------ ------------ ---------- ------------ ------------ --
4.452.31,
4,452 31
'"'J i ~~c~~~~~~~~ :-~~~l ~~~~~~ ~~~---~<~;~~~;~!~ B!~!
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936
Personal Services
Equipment Expenses
Communication Services
Furnishing Heat, Light, Power and
Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
SURVEY ACTUAL BY DIVISION UNITS
77~----------1----------1-------------- :;; Division Xo. 1. ______ 1 $ 29,202 16
-----------1 586 771 $ 66 791
S 25 001 S 4,122 061 $ 1,068
---------- 35,071.55
......
2-------1 20,104 48
620 361
15 551____________
24 001 3,fi68 68,
974 241 __________ ---- --------- --------- $5,396 58
30,803.89
1------------------------ ____ 3_______ 30,111 04 1,046 83
39 61 ____________ ----------
3,073 111
938 751 _______ -1 $ 9S 53-------------- 16,010 08
51,317.95
---]~---- I_ _ _ _ 1_ _ _ ,_ _ _ 1_ _ _ _
TOTALS ________ $ 79,417.68 $ 2,253 96: S 121 95!------------: S 49 00, $ 10,863 85 $ 2,98176 1__________ 1 $ 98 531-------------}21,406 66 $ 117,193.39
1
1==~-~~~~~=~====1====1=~==1==1~-~~=1===1=1='==1==1-----
SURVEY PLANS BY DIVISION UNITS
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENER~L MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936
Schedule No. ID-D
Personal Services
Equipment Expenses
Communication Services
I Furnishing
Heat, Light,
Power and I
Water
I
Rents
I
!
I
I
Supplies
I Printing, I
Special I
Traveling
and
Insurance Binding, Payments to and Mis- 1 Total
Expenses Materials
I
I
I I Publicity, Contractors cellaneousl Expenditures
Etc.
Expenses
-~
----
- -- -
MAINTENANCE SUPERVISION BY CONGRESSIONAL DISTRICTS
>-' District ~0. !_ ______ 5
"""'
:L _____
2,5118. 7)s 2,891i.0.5 1 2, 649.661
22.75 $ 11.41 17.39
481.55 $ li:l6.06 509.05
1.26 $ 4. 92 I. 92
61.80 $ 151.20 i12.34
1,070.62$ 1 ,236. J:l 1,091.42
174.06 $ 182.37 157.77
15.02 15.69 $ 2.24 J:l. 91 ---
L 5 ____
2,315.15 639.29
24.94 2. 75
388.30 155.38
1.05 -2.66 -
943.53 325.15
184.36 243.61
12.151 ____ 4.00 ---
ti.. L ..
2,4111.64 2,28:3.81
25.71
430.41 445.76
1.40 ---------9.50 ---
990.65 1 '166.11
208.07 62.07
13.63i----14.321 __
g__ ___ 10.. _____
2, 6;"7 .2:1
3,:342.36 . 1
2.41iG. 76;
2.51 26.81
469.12 600.77 422.58
10.28 --~-----1:l.i14 __ 1.17
1,368.42 1,657.34 1,002.22
7ii.45' 70.61 204.22
16.66-20.96 .. 13.52--
1L
4.225. 70
IG.47
904.\JO
8.42 220.68 1,800.02
174.44
22.641;.._
-;~~~~~~~;-=~~~~~~~~~~~~~~~~~~1~~~~~~~~~~~-~~~ 12..~----
TO'L\LS __
3,261.84
31.86
582.65
1.08
51.48 1,320.11
246.74
17.501----------
---~-------- --~~------ $ --- $ 4.81
I 7.95 'n
-- -- 6.54
I
4,425.79 5,140.88 4,541.41 3,871.59 1,372.84 4,089.51
3' 981.57 4,623.67 5, 712.52 4,137.28
----
-I
2.01
7,375.34
8.94
5,522.20
-;---~-. -~~
r$ :J2.36!$ .54.794.60
_,-~ _____ /~ - - -
I ~---
STATE HIGHWAY BOARD OF GEORGIA
Sehedu\e No. \G-O..Con\'4.
ANALYSIS OF GENERAL MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936 -
Personal Services
Equipment Expenses
Communi~
cation Services
Furnishing Heat, Light, Power and
Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing, I Binding, Payments to
Publicity,] Contractors Etc.
Special I
and Mis-
Total
cellaneousl Expenditures Expenses
MAINTENANCE DIRECT BY CONGRESSIONAL DISTRICTS
~----------c----------,-------,--------,----------------
1
-----
,_.. District No. ]_______
~
2_______
48,364.01$ :Hi,342.211$ 45,181i.371 37,353.87,
203.661$ 267.581
6.09!$ 162.50 S 155.431 232.72
440.971.$ 9,743.54 $ 1,29:3.151_ 711.74 1 6,744.951 1,:Hl2.:lll' __
96,556.53 92,01.\.95
3.--
45,042.801 :ll,500.42,
226.36
74.61i 162.711
461i.21 5,143.921 1,220.64--
4___
42,329.58 24 o38 34
143.26
uo.o:JI
57.oo
2n.22 6,183.62 t.o.\o.92 __
1.85
8:3,839.57
76,057.97
5_.
13,680.00, 4:075:4811
45.241'
22.32 200.44
91.44 1,168.21 292.521 __
1!!,575.65
6___
47,079.021 31,946.92
189.16
t:J2.80 1 134.34
205.07 8,405.98 1,108.59--
8[1, 201.88
'--8____
:l7,447.37 31,559.461 ,\3,586.28~ 29,824.38
166.09 188.o:l'l
80.11 8!!.33
803.80 531.58
373.15 :J98.90
4,056.77 1,020.91-5,857.Y2 1,195.54-----
75,597.66
3.00
91,674.96
9_______ 63,529.15 40,450 ..\3
242.94
117.:ll 7:34.20
504.851 5,519.5[1 1,485.22----------
112,58:3.70
10____
43,320.02 34,542.7[1
153.09
36.80 445.87
213.28 8,489.99 1,123 43$ 1.20-
88, :J26- 47
ll____
75,549.94 5!,171.811
388.771
84.281 680 40
978.02
1 9,!J14.5811,flfi0.5:l 1__ -----------[---_-_-_
43 140,729.76
- ---------- 12____
61,140.50 43,236.02
230.59
!68.11 42fi.OO
575.24 9,455.64 I 533.60 _ _
-----~1--~,- -~---~--- 1 -~
116,778.04
1 TOTAL~--- --- ~,~~-~~~~3:G.::::~~~~4~=i~=~036,: ~6;5~~~~[;!:o~:$~~~. ~:$:4_,;65:::$ ~ 2~:$=- _~-~~. O~j:__ ~0~$~~08::l8~=
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 10-D-Cont'd.
ANALYSIS OF GENERAL MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UN ITS
JULY 1, 1935 TO JUNE 30, 1936
Personal Services
Equipment Expenses
Communi~
cation Services
Furnishing Heat, Light, Power and
Water
Rents
I Supplies
Traveling
and
Expenses Materials
Insurance
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
MAINTENANCE SUPERVISION BY DIVISION UNITS
...... ~ Division Xo.
2_
3
___ Is
5)$ ll,o6o.Js
ll.121.4:ll_
----,--- ---1,------ -:-----,- -:---- 9,594.85
1-4--:36J..20J~ s 2.75
--
2,350.47'
1.887.53 _ 1,788.53
17 Bois 577
_
__ __ _
I
4o.oo 1
___ _
1- - -
4,729.J$
528.Js 6o ools
s s 2 24 __________
6.82
19,377.02
4.363.72! 4,878.15
1.002.75l 456.13
6600.0o0o 1__ ____________
_ __
_______ _ _____ _____
19.00 6.54
18.590.63 16,826.95
----- ------,----
------ -----;------
TOTALH. ----- $ 31,776.281$
182.60$ 6,026.53,$
57.60$ 577.50,$ 13,971.72,$ 1,987.77,$ 180.00$ 2.24,-------------- s 32.36$ 54,794.60
===l~====l======l_====r==r===i====r====l===l====l='==:====
MAINTENANCE DIRECT BY DIVISION UNITS
DiviRion '\o. ______ $ 1!15,581.19 $ 1:33,106.741$ .025.13$
------~-$ 296.38$ 1,075.S:ll$ 2.739.411$ 29,520.48!$ 5,255 ..221 ...... ./ .
3.7~$ :368,613.13
2_
199,510.34 149,172.69
72!1.88
404.09 1,14S.41if I,OII.I:l[ :J2,7:l2.5!1; 5,117.90:$ 1.20 $ 1,000.00
1.25 390,829.53
181,172.51 114,662.80,
{i89.i6
3:35.80 2,440.27, 1,-18.1.5.11 18,422.641 4,28:!.24/--- ----!1--------------
3.00 323,495.57
- - - - - - - - - - - - - - - - - - - - - - - - --~------~------.--------~-----------------
TOTALR_
__ S 576,264.04$ 396,942.23 S 2,444. 77,S 1,036.27 $ 4,664.56 S 5,236.09$ 80,684.71 $14,656.36 $
1.20$
1.000.00/S
1
1
==,==,~~===r=====,=== ,====r==--~=====,====1=~~--,
8.00 1 1.082,938.23
l 1
---------~----~----~----~------~--~------~----~--~----~------~----~-------
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936.
Personal Services
Equipment Expenses
Communi .. cation Services
Furnishing Heat, Light, Power and
Water
Rents
Traveling Expenses
Supplies and
Materials
Insurance
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
RECONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS
Dbtrict No.
~::::::: 1__ _____
1
$ 453 011 ____________
::::::::::::1::::::::::::
1
$
3 00
::::::::::::
------------1----------
:::::::::::: ::::::::::
$ 258 941------------~----------
:::::::::::: :::::::::::: ::::::::::
$ 2.45--------------
:::::::::: ::::::::::::::
-
-$
-
1~~----
-~-~
717.40 12.88 105.00
4_______ ------------ ------------ ------------ ------------ ---------- ------------ -- --------- ---------- ---------- -------------- ---------- --------------
~::::::: -- ---;97-58 ::::::::::J::::::::::: :::::::::::: :::::::::: :::::::::::: :::::::::::: :::::::::: :::::::::: :::::::::::::: -----;ii:oo --------247:58
/ _______ ------------------------------------ ----------------------
65.15------------ ---------- ---------- -------------- 150.00
215.15
8_______ ------------ ------------ ------------ ------------ ---------- ------------ ------------ ---------- ---------- -------------- ---------- --------------
9_______ ------------------------ ------------ ------------ ---------- ------------ ------------ ---------- ---------- -------------- ---------- --------------
10_______
52.42 ------------ ------------ ------------ ---------- ------------ ------------ ---------- ---------- --------------
20.00
72.!2
II_______ 12_______
f>17.68 73.50
_$_______1_._0_0_1_________8_._5_0_-_-_-_-_-_-_-_-_-_-_-
- __
T_________
491.61 $ 24.79 ----------
1.23 --------------
90.00
19.75 ____________ ---------- ---------- -------------- ----------
1,234.81 93.25
TOTALS ________ -$-~-$---1.~~~~===:===~ 24 79~~~~~~~~~
Schedule No. 10-E--Confd. STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936. --
Personal Services
Equipment Expenses
Communication Services
Furnishing Heat, Light, Power and
Water
Rents
Traveling Expenses
Supplies and
Materials
I Insurance I
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Misr.ellaneous Expenses
Total Expenditures
RECONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS
1 ~ District No. ~::::::_ $ !:~:~ ~~ .~~~ ~~ ::::
1!:~:~ ~~ 710.50 _____ 105.00 $
::::::: - s
-~-591::__
:::---1-: :::::::1
:~::~~ ~~
Q')
3...... 10,288.85 6,228.43 ---
2.00
132.00 32,672 04-
---- -- ----------
49,323.32
L ____
189.49
42.90 ____________ ------------ ____
5.80 ---------- __________ ______________ _
238.19
5_______
6_______
7_______ s_______
598.81
3,473.30
10,592.40 391.00
395.65 ------
1,919.79------------
5,924.77 $
7.00
146.14 ____________ ____
1 ll____ 5.24-
89 70 54.50
1,661.12
---- ---------- --------------
16,946.85- -----------------------------------------
39,128.67---------- --------------------------------2,235 87 __________ __________ ____________
2,655.58
22,430.75
55,712.58 2,773.01
g_______
452.76
552.30 ------------ ------------ --
180.35 ---------- ---------- -------------- ----------
1,185.41
10_______ 2,037.41 1,628.57------------
1 II_
10.30 3,275.98----------------------------------
6,953.37
11_______ 7,799.65 5,099.98
12.48----------
154 50 31,669 07----------
3 24 - ------ --------------
12________7,131.~~-~775 88 ___6.33 ~---------~0~--~~- 14,903 33 ~-==~~_::_-~~----~~~~----------
44,739.02 24,038 99
1 TOTALS..______ ~3~~~~-~241 58 ~~~~~===9 ~~:=~~c~~~~l61~~~~:~j~=5~8: :-------------~~~~~~~
STATE HIGHWAY BOARD OF GEORGIA
Schedule Ko. \0-E-Con\'d.
ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936.
~~---~--
Personal Services
Equipment Expenses
Communication
Services
Furnishing Heat, Light, Power and
Water
Rents
Traveling Expenses
Supplies and
Materials
I Insurance I
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total Expenditures
RECONSTRUCTION SUPERVISION BY DIVISION UNITS
RECONSTRUCTION DIRECT BY DIVISION UNITS
Division No.1 _______ $ 29' 384.82
2 ...
11,866~28
3 _____
12,034.97
-----
$ 13' 565.28 $
5,712.33 ---
6, 963.97
18.81 7.00
4.22 5.24 --
----~~
~~----
TOTALS..... -- $ 53,286.07 $ 26,241.58
25.81 $
g 46. $
-~~--~
~---~-----~- - - - - - -
871 27
124' 154 27 58,215 39 60,035 82
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30. 1936
Schedule No. 11
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF
-~-----~----'-~ --------------~-~
Land,
. : :~:r .;:....r. ~-. . . -T ...... ...-:-:-:~:-: -1-;~-:3-1:~-.~ EXPENDITURE
General Admtnistra-
tJOn
PERSONAL SERVICES G. 0. Administration Administrative________ _
Research and
Analysis
Collection I of .
Revenue
1
Quarry
!I
Construction
I
Surveys
Maintenance and Recon-
struction
Shop
Buildings and
Equipment
Other Functions
Total Expenditures
:-1:-:-::_:_:-::-:-::-:1-:-::-:-::_:_:-::_:_:-: -.
Others _______________ _
Field Office Administration
Administrative~-- ____ _ Others ____________ _
9,900 00 ---------- ---------- ---------- -------------- ------------ ----
5,146.45----------------------------------
-------------------
Research and Analysis
Administrative______ _ Others ___________ _
-- $ 3,000.00 --- ---- --------
---- 15,094.59 --
---------- --
G. 0. Shop
:: :_:: : :::::: :.::_:::: :::::::-- Administrative________ _ ----------------- ---- -1---
Others ______________ _ ---------- -------- __
___
-____
---- $ 5,080 65 ------------ ------------6,879.14 -------- --------------
::: : ::-: _:::-:::_-[::::::: ~---:~~:;~~;~: _:_:_::::::. :- Direct Shop_----------
Supervision Direct Supervision_____ _ ---- __
: : __ __ __
50,879.99 ------------ -------------20,145.44
Others _______________ _
13,025.03
Direct Costs
f:3urvey Parties ________ _
--- -------------- s 79,417.68 ---
Maintenance Patrolmen_
151,126.27--------------------------------------
Construction and Recon-
struction Foreman ___ _
Equipment Operators __ _
Shop Employees, Field __ Sign Employees _______ _
Other Skilled Labor..__ _ Common Labor ______ _
Quarry Direct Quarry _________ _
Enforce. of Revenue Laws_ Professional Fees _____ _
9,900.00 5,146.45
3,000.00 15,094.59
5,080.M 6,879.14 50' 879.99
317,805.47 29,540.19
79,417.68 151,126.27
TOTAJ,S _______ ----
___ ,'--
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936
-- - __-_ c=-====-====--==-=====~======;=======;===;====c;====
I
ADMINISTRATION
I CONSTRUCTION
MAINTENANCE
\
OBJECT OF EXPENDITURE
I ~~ner~~-;;esearch ~-Collection ~~----;---- --'-----I-M-a-ln-t-en_a_n_c_o+----,, Land Build
. Administra- and
of
I Quarry Construction
Surveys
and
Shop
ing~ and
i tion I Analysis Revenue
Reconstruction
Equipment
Other Functions
Total Expenditures
---- ------1--~----~--
EQUIPMENT EXPENSES I
-I--I-
I
Automobile Maintenance ,
Tues and Tubes________ 1-- __ -----~~
j
2 oo _____ ... ______ ... s
302 71 s 300 171$
536 10 ------------ ___________ -------------- $ 1,140.98
Accesso.ries, Parts and 1
Repairs _____________ 1
I
Ro::~~:~~:~:~::~-.~~::: 1------------
1,
5 00,______ -1----------1
4.50------- ------------1
1,877.62 1,395.121
129.75
15767
93 30 S
2.45------------ --------------~
14.30 --------------------------------------1
3,373.49 306.22
----------1 Gas and OiL__________ [$ 146 951 244.38 _______ .
88,072.65
25 37 207,219.13
64.45------------ ------------- 295,772.93
Tires and Tubes. ------1. Accesso:ic..q, Parts and :I
Repairs _____________ i
~:~~~~::~:~~~~~~~:!~~ ~ Miscellaneous Charges.. '1
25 52[
61.70~----------~----------~
I
133 51 I
844 0\----- ___________
::~~------1-~~~-:_::._::: ____
1
__ __ ________ ----------~'1
I, 01:
:.::.::_::
11,177.24 _____ ------- 1
101 152,34 398.09
27.74 4.05
1,1:: ::
338.701
9,780.17
103.50--------------------------
201,506 38
445 00------------ -------------
2,207.91 .. --------- ---------- --------------
--~~-7:1::::.::::::: 184 :: -----
::::::::______
21,148.19 304,109 02
2,610.05
::::: ::
l Repairs to Machinery
Equipment_. __________ [------------'-
_ ----------$
i 12 90\
I
7.94 _____
-------~
5.00 2,165.62--------------------------
2,191.46
R~:lr~~:;~i~;k~~::_~,~~ I 1,828 911
1-------- -__________ I
1
197.58----
820.25
10881 ------------ --------------
2,955.55
Tr:::~~~atl~~-~f--~:"1::1 ____ ----------\---------~------
1,510.36
5 141
998.77
95213--------------------------
3,466.40
TOTALS ______ ---~~ 3,150-; 52;;62 ~~~~=---~~-_;~o s___:o_5._0~~ ~~ ;-,253~~:~-=42~~6!_j~--~.878 771===l::=.::===l~~~~
-------- -~---- ______ c_. _::=_.:=_":~---- ---------=-=----=----=-=.::-_-::__-::-::_--:::-_--=-__:=__::_::_-::__:=-==-.=---==:_:::-- - - - - - - - - -----_-
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
Schedule No. 11--Cont'd.
JULY 1, 1935 TO JUNE 30, 1936.
= : = = = = = = = = = = - ' - "___ - - - - - - - - - ---------~--
ADMINISTRATION
I--CONSTRUCTION
MAINTENANCE
OBJECT OF
Gener~~-Res-:.~;;-~ Collectio;;-1-- - - - - - - - - - - -
Maintenance
EXPENDITURE
Administra-
and [ of
Quarry
Construction
Surveys
and
Shop
--=1=---=~---=,~------- tion
Analysis Revenue
EQUIPMENT PURCHASES
Reconstruction
Trucb;_ ___ _
_ ::::-:::-y-:-:-::::___::::::::::-_r -------- Tractors_______________
Road Machinery,Misc. __
Offire Equipment __ _
Engineering Equipment_
__ T ______ _
----------
La boratory Equi prncnL_
Land, Buildings and Equipment
Other Functions
Total Expenditures
2, 118.97 -------------2,575.00 -------------1,340.37-------------1,194.14 -------------3,560.80-----
21)1.97 --------------
2' 118.97 2,575.00 I ,340.37 I, 194 14 3,560.80
261.97
TOTALS __ _
$ ll,051.25 -------------- $ 11,051.25
COMMUNICATION
SERVICES
Telephone and Telegraph $ 8,124.09 $ 11.43 $ 62.73---------- $ 1,273 OS $ 18.97 $ 5,60101 $ 847.19--------------------------
15,938.50
1-'-'.""-;-; _.::-"'_"'-:- Postage_ TOTAL~-----
8,317.941__
230 32 __________
~~":"'
~~~:::::
.
_.--;;-., ,
1,728.20
102.98
2,007.60
1.50--------------------------
13,288.54
_;:,~ ;,~_-s--8~-s--~f~-------~--~~~------:._--~---------~ --;-~-o.-22-7~
1
STATE HIGHWAY BOARD OF GEORGIA
n o . ~neau\e
ll~onta.
ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936.
- - - --------==========,~===============================-~~==~~====-~======
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF EXPENDITURE
General Administra-
tion
Research and
Analysis
Collection of
Revenue
Quarry
Construction
Surveys
Maintenance and
Reconstruction
Shop
Land, Build ings and
Equipment
Other Functions
Total Expenditures
HEAT, LIGHT, POWER,
WATER AND CLEANING
SERVICES
Furnishing of Heat ____ _
826.31
78 99 _____
I
3.87 __
Furniohing of Lights ___ _
1,413 52 713.92--- --:: :::
1,686.08--
~-; ~ Furnishing of Power___ _
Furnishing of Cleaning __ Furnishing of '\Vater ___ _
TOTALS ___________ _
35.45
25 72
:: I "'}
~~- ~;: ~ ~=-- 1.50------------I
RENTS Rents, Road Machinery_ Rents, Buildmgs and
2,093.57 $ 49 00
422 64 87.79 12.00 580.90
196.83 --------2!1a.l2 -------1,110.04-
198.20 ------------ --------------
1,103.33 $ 1,804.19-------------------------- $
I, 106.00 4,535 38 1,260.50
24.00 3,011.99
9,937.87
I ,666.17 4,433.80
52 00 --
I ,665.17
7,335.77 2' 928.00
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
Schedule No. 11-Cont'd.
OBJECT OF
General Research Collection
Maintenance
Land, Build-
EXPENDITURE
Administra- and
of
Quarry Construction Surveys
and
Shop
ings and
Other
Total
tion
Analysis Revenue
Reconstruction
Equipment Functions Expenditures
- - - - - - - - - ~--~~~~~-
-------~-1---~-1---~--------~-~-~---1------
TRAVELING EXPENSES
Subsistence ____________ $ 4,012.70 521.00 $3,246.75----- -- $ I ,526. 91 ------------
6,277.26
569.05 ------------ --------------
16,153.67
Transportation
Gas n,nd OiL ________ _ ------------ 210.72
49.50 ------
3.88199 3,112.81
879 64
1.13 ------------ --------------
8,135.79
Mileage Allowance ___ _ 15,055.10 2,107.44 16,938.20----------
60,410.50 7,711.55
13,490.56 1,947.82 ------------ -------------- 117,661.17
Other Tran~portation _
209 50---------- ---------- ----------
810 27
39.49
2_ 70
91.80 ------------ --------------
1,153.76
1 - - - - 1 - - - - - - - - - - - - -------~~-~~-~~~~~-f---~-1--~~-1----+~-~-
TOTALS __________ S 19,277.30 $2,839.16$20,234.45----------
s 66,629.67 10,863.85
20,650.16 2,609.80 ------------ -------------- 143,104.39
,___.
-------------,----1------1--------------1-----1-----1------1------
;::3 SUPPLIES AND
MATERIALS Office Supplies _________ S 10,748.05 $ 365.29 $ 36.00----------
675.51 ------------
s 1,998.00
143.55 ------------ --------------
13,996.40
Drafting and Engineering Supplies _________ _
Photographic Supplies __
3,874.69------------------------------
13,742.88 $ 2,980.26
100.68------------ ------------ --------------
58.86 ---------- ---------- ---------- -------------- ------------ -------------- ------------ ------------ --------------
20,698.51 58.86
Cleaning and Toilet Supplies ____________ _
Laboratory Supplies and Materials ___________ _
Forage and Supplies for
2,207 77
28.57 ---------- ----------
3,025.47 ------------
23.65
15.00 ------------ --------------
1,636.17 ---------- ---------- -------------- ------------ -------------- ------------ ------------ --------------
5,300.46 1,636.17
Animals ______ ---- __ _
Food ~upplies __________ ------------ ---------- ---------- ----------
I Wearing AppareL ______ ------------ ---------- ---------- ----------
Medical Supplies _______
10 58------------------------------
~;;~9~~~~~~:~~s:c~::: ::::::~~;:;;~:::::::::: :::::::::: ::::::::::
43,358.69 ------------ -------------- ------------ ------------ --------------
'!~~/ !!! .oo:;J; i~~p;JLHJJH.j
43,358.69 104,188.96
21' 820.45 3,569.06 5,487. 7~ 8,777.61 g,oo7.11
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936.
Scbodule Mo. \1-cont'lll.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF
General Research Collection
Maintenance
Land, Build-
EXPENDITURE
Administra- and
of
Quarry Construction Surveys
and
Shop
ings and
Other
Total
tion
Analysis Revenue
Reconstruction
Equipment Functions Expenditure
~.082.37 j__ ----- ------------ -------------- ~.592.~2 ---- --~- --------- ------- --- -------------------------
SUPPLIES AND
MATERIALS-Continued Explosives ____________ _ ------------ ---------- ---------- ----------
------------
510
Building Supplies and
Materials ___________ _ Signs _________________ _
7,381.69 ------------
137.81 6.054 53-
7,519.~0
6,054.53
Material~. Roads and
Bridges ________ _
287,111.57---
222,489 82 ---- ------- ----
509,601.39
Materials, Shop _______ _
-------------- $129,382.95 ------
129,382.95
Gen{'ral Supplies, Roads
and Bridges _____ _
12,539 09 ------------
4,848. 93 ------------ ------------ --------------
17,388.02
TOTALS
$ 17,873.20 $2,030.03 $ 36 00---------- $ 516,413.01 s 2,981.76 s 244,055.83 $130,019 15-------------- ----------- $ 913,408.98
INSURANCE
Fire Insurance, Buildings
and Fixtures -------Liability, Fire, etc.,
------- ---------- ---------- ---------- -------------- -----
58401 $ 87.92 ------------ --------------
146.32
EquipmenL ---------
782 17 $ 36 38- ---- -- --------- s 3,187 05---
13,958.91)1
303.03------------ --------------
-----------+------------- Bond Premiums_
1,590 001 27 001 s 48 00 s 6 001
372 141____
819 00
42.00
;I _ _ _ _ -= -; TOTALS__
--2,;;;-~-~~:~ _ 48 6 ool=--3~559 ~=---- -----~-~ __'~;;" ~~~~-9~~~-~-~= --t~
18,267.59
2,904.14
__:~318 ~~
STATE HIGHWAY OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936.
Schedule No. 11-Cont'd.
OBJECT OF EXPENDITURE
PRINTING, BINDING,
ADMINISTRATION -----I---CO_N_STRU~~~N- ___ _ MAINTEN~~~-__1
-~eneral ~earch Collection I
Maintenance
I Land, Build-
Administra- and
of
Quarry Construction Surveys
and
Shop
ings and
tion
Analysis Revenue
Reconstruction
Equipment
- - - - -------- - - - - - ------ - - - - - - -------- --- - - - - - - -
----- -
Other Functions
Total Expenditures
PUBLICITY, ETC.
Printing, Annual Report_ Printing Maps ________ _
Stenography, Typewrit-
1,853.50 ----------ml.21 __________ _
-------- $ 1,853 50
I
793 21
ing and M ultigraphing,
Job Work.--------Photo Printing and
Developing, Job Work Advertising_
3.00 ---
7:l. 92 ----
17.50 s
7 11 ---
12 \1.\
I
_____ --_J:_!~_:_-:_--:-_--
76.92
92 41 6,007.20
TOTALN_
\18.53 $ 12 9.\ - ------- ------------r
8,823.24
INDEMNITIES Compensation, Medical Service Claims aud Costs ____________ _
Damage to Private Property __________ _
Damage for Per~onal Ncrvice:-; __ -----------
TOTALS_
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY I, 1935 TO JUNE 30 1936.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF EXPENDITURE
General Administra-
tion
Research and
Analysis
Collection of
Revenue
Quarry
Construction
Surveys
Maintenance and
Reconstruction
Shop
Land, Buildings and Equipment
Other \
Total
Functions Expenditures
- - - - - - - - - -
-~-----
-------- --------------------------
PAYMENTS TO
CONTRACTORS Payments to Contractor:3
----------~---------- ---------- $9,170,408.84-
1,000.00--
-------------------------- $9,171,408 84
--~;~ ----=--J~~~~-~ ==~~~ --~=~;; ~-~~-~~ -~~~~~~- REDEMPTION OF DEBT Refunding Certificates __
--- $2,648,765 80 $2,648,76.1 80
>--' SPECIAL AND MISCEL
Ql LANEOUS EXPENSES
Miscellaneous Camp Expense _________ ----
Blue Prints ___________ _ Tests __
Subscription::; and Dues_ Incidentals __ ---------Transfers
Convict Farm _______ _
Motor \'chicle Tags __ _ Burial Expenses __ _ Right of Way Purchases Rewards _____ _ Court Co::;ts ___________ _
li.OO _
$1,930.!17 ------
1,858.00 100.50 ------
531.50
20.43 ----
2,945.58 ----------------- $ 93,215.91
:JO,:l37 .02
56.48 -----
41i0 24 8 00 -
15.00 ------
2,775.00 57,822.73
2,94.1 .18 g:J ,221 91 32,743.23 1,958.50
616.41
2, 775 00 57,822.73
TOTAL~-------TOTALS _________ _
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936
Schedule No. 11-Cont'd.
OBJECT OF EXPENDITURE
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
-----,--- ------------- --------,----1-----J------
General Research Collection
Maintenance
Land, Build-
Adminlstra- and
of
Quarry Construction Surveys
and
Shop
ings and
tion
Analysis Revenue
Reconstruction
EQuipment
Other Functions
Total Expenditures
LESS: INTER-DEPARTMENTAL BILLINGS Blue Prints G. 0. Salaries_________ _ G. 0. Supplies ________ _ Shop Total Expenditures ____ _ Research and Analysis Total Expcnditllfes ____ _
TOTALS... __________ _
s 82,820.31 ---------- ---------- ---------- ------------- ------------ -------------- ------------ - ---------- --------------
11.038.71 ---------- ---------- ---------- -------------- ------------ ------------ - ------------ ------------ --------------
82,820.31 11,038.71
--- $ 202,500.33 ------------ -------------- 202,500.33
NET EXPENDITUI\ES_
Schedule No. 12
STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND EXPENDITURES
BY TYPES JULY 1, 1935 TO JUNE 30, 1936
Description
I July 1, 1935 Jan. 1, 1936
To
~
To
I Dec. 31, 1935 June 30, 1936
Total For Year
ALLOTMENTS
G-rad-ed - Earth and SoiL --- I$ 244, 815. 21$ 455, 174. 54 I'$ 699, 989. 75
Gravel and Macadam__ ----
907, 038. 18, 1,352, 597. 51 2, 259, 635. 69
gurface Treatment-------- 2, 347, 224. 58, 1,257, 329. 69 1 3, 604, 554. 27
Bituminous Concrete_____ l, 050, 071. 90 109, 071. 68 'I 1, 159, 143. 58
cement Concrete--------- 1, 347, 719. 99 717, 133. 59 2, 064, 853. 58
BriCk--------------------
94,789.40 1, 956. 97Cr.l
92,832.43
structures__ -- ---------
501, 521. 59 764, 555. 02 1, 266, 076. 61
- - - - - - - - - - - - - "-
-----~-
Totals ____________ - ____ ,$ 6, 493, 180. 85 $4,653,905.06 1$11, 147,085. 91
I -
EXPENDITURES
I
Graded Earth and SoiL ___ $ 704, 537. 78$ 396, 996. 65 $ 1, 101, 534. 43
Gravel and Macadam______ 1 1, 559, 192. 19, 702, 650. 84 2, 261, 843. 03
surface Treatment________ 1, 689, 605. 20 1,244, 583. 30 2, 934, 188. 50
Bituminous Concrete_____ 893, 527. 43 277, 899. 47
Cement Concrete_________ 1, 302, 278. 14 915, 443. 47
Brick______________________
1, 310. 44 88, 495. 26
1, 171, 426. 90
2, 217, 721. 61 89, 805. 70
Structures_________________
565, 421. 05 193, 900. 99
759, 322. 04
Totals_________________ $ 6, 715, sn23il$3,819,96~~~$i.0,535,'842.21
177
STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT
JULY 1, 1935 TO JUNE 30, 1936
Sr.hedule No. 13.
DESCRIPTION
I Personal Services
I
Equipment Expenses I
Communi I Furnishing
cation H eat,Light, I Services Power and
I Water
Rents
I I Traveling
Supplies and
I Expenses I Materials
EXPENDITURES
I Printing,
Insurance Binding, Publicity
I Etc.
Payments to Contractors
~--
I Speciql
and Mis-
Icellaneous
Expenses
Total --
~ su~~~~~~~~-~T~------- J _ : I
I
d . mz. 4:31i 3) 1,1189 $ :J!l2
1,
I
.< zgz 31[$32,5'l4 IJ5 n,G2sJ__ ___ -_-_!_-_--__- ,
Federal Ai,i__ ____________ l 28,125 91!
227 88l lli9 40 ______ -j :JG 00 5,010 20[
855 091,
_:;,_
:<iational Recovery _____ --1 119,073 37 1,0119.02 .140 48
:J 871 271 00 19,082 04 4,~70 51'_
_ __
---~
Works Program ___ ------[ 9,577 75[
21i 28
40 07[
TOTALS..____
.1-;;;,2~~~:-;-2~;~
55
1
1
STATE FORCES
I
I
1
!IJ 00 1,877 2111
421i.l5j--- ___ _
-1----1 -- --- $--;,-;7;:;5~~4-~-r$ ~~;-;~~~-~~~-~1 !--
--
-- ---
-~-
Convict Forceo.._
-I 19,667 G) $ 42G 34j
Iii
A<phalt Forces___________
r- ____,--- ___ Divioion Forces ________ __!
4,7!17 .12 ___ --------1
Iii
490 04 __ ___ _
5
I_ _ -
--
J TOTALS ____________ $ 24 %1 79 1 $ 42il 34 $ :18 08: _______
1 $4,028~801 $
1,415.fi7 49 50~
_ -i -
-- -- -
$5,4'14 fi:Ji S
387 54 ____ _
:320:7U.5I1011____________ ~ 1
-
718 osl______ ---1--- ------1-
Total Supervision ___
-1 -~--~~-0~
1 19-~}-~~37-8--8;
~~~0-;;:
~-----1
_
S-=--3
~~~~-li~;-;1l~:~=~~~~
- - - - -1 ---~----
$
~3,4:8~~:,:
I
---------1--:c:-.~~~_):;-~--
I
I
I
.
I
__ ,$14.430 57:
__ 2,098 901
188,404.53
3G,523 38
- -110,5{)4 2.1 155,416.54
--- -~~o_~l___1~934 41
- 1$28 004 59[ $ 393,278 86 _I_--
1
I
1 $1. 4:J3 7:l:
25, !I flO 82
1 _ _
!i90 U 1
i,227.02
1
1
148 .57 1
722.88
_r;;27;;;;j; :l3.91;~~
---~-; ----~-----
s ----- $30,3:17.02 427,189 58
~
) ~ ~=~~-~~=~,,
STATE HIGHWAY BOARD OF GEORGIA
CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT
JULY 1, 1935 TO JUNE 30, 1936
.IF . . : commun1-~ urn1shmgI
I
I I supplies .
. . Prmtmg.
I SpeciaI
- .__]___-- --------- ---- - ---- ------- DESCRIPTION
Personal Services
1
,;:~~~"= -~
Equipment Expenses
cation Heat,Light,, Services Power and
1 Water
Rents . Traveling I and
Expenses Materials
,
~- 1
. Insurance Binding, Publicity
Etc.
-~-----
Payments to and Mis-
Contractors cellaneous
I Expenses
~-
Total
~~~::t~~!o"::::: ___ - _,::---------
I
'
-~
$:::!.:~:~~~ ::~1::::::_ $~::!~:~~~ ~~
Federal Aid____ :-iational Recovery ____ ---::::::::_____
--
-I
I
-
--- i_______ :_--J
T-i
--- I
-:~--
(i49,671.78: 3,321,05l.UG'_
649,671 78 3,321,051 96
W:~::::ra:~ - - - ____:_: ~~-:::::~ ~---~-~~~[>~:: - :_ ~~t~ ~~~~~-::~:~~~~~~------ -~ --- -$9~:~~::: : ----~~ $9,::~~~~~
- - - - - - '---~-- ---'~-- ~ - - - ~:--- - ~ - - - - - - - - - - - - ~-- - - - - -
STATE FORCES
Convict Forces
$110,432 h7 $13b,237 0.11 $1,720 28j $:3,.199 68 $ 875 13 $1,1UU GG $:ll5,hU2 28 $2,283 04 _ _
$5.339 \16 577,349.75
Asphalt Forces_____
68,240 5h 42,288 /(,
UU 02[
4.1 95 5h6 88 1,:l4b 401 152,929 84 1,276 151
--------------'
6.20 266,808.76
Divbion Forces____
:l5,430.80 24,100 151
1.25
2.15 140 00 115 40 34,2\12 531 _______ ____
3.00
94,085.28
TOTALS _____________ $214, 113~ ~~~(i2~~~~~;;;-~~__s:-~~78 _51_-~2 01~~~(i21 ~~~;2,~4-~~~:5.1;-~ ~~~---- ~~~~--~~-~ _5~~~~ }=~~24~~
1
Total Direct____ Total Expenditures __
$214,113 03 $202,625 96 $1.820.55 $:l,647.78 $1,582 Oll $2,631.46 $502,U14 us; $3,559.1[1 _________ $9,170,408 841 $5,34\116:$11,108,652.63
I
-
1 -
- - ---.-
- - - - - -:: _:: .:==-__:_--::--!
_: :::-==~
-- -:__---
$-~8~8_:_~~~!2()(j~Q~4~~ $~,oousl__$~h51 b5[ ~2.199 32;$6"_-~9 t'l ~5~~4!.l o~l;l~S:9"1u~~-~~~ ~:~9~~~~40~-~~$3~~~~~~$11,535,842.21
Schedule
No .
13 -
C ont'd,
STATE HIGHWAY BOARD OF GEORGIA
CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT
JULY 1, 1935 TO JUNE 30, 1936.
CONTRACTS State Aid
1
ALLOTMENTS
-------- \-----~-~----------- --
1
New Contracts
Revision
Total
1
---- I
I
'
Contractors __________________________ !
4,099,835.111 $ 73,043 7/Cr.
Fe~~;~;~~i~-~~~~:::::::::::::::::::::::1 ~:~~~:~:! :~i 2~~:~;~ ~~Cr.
4,02G,ii 1j
~:~~~:~~1;:
---:--------- i ~ationa\ Hecoyery _____________________
1,720,372 931 237,235 81Cr.
Works Program________________________
1,203,097 33
G 9.i.\ 63
~---------,---~~
11,,421803,,I1l.3\z7
t2 It
TOTALS. _____ --------------------- $ 10,849,635.61 486,G85.3GCr. S 10,362, 950 2S
sT;;,~,~o:C~,~:_________________________f_t_ -~:-:30 J~5,il4~:-- ---:::
Asphalt Forces _________________________ I
257,206.25! 154,045 81Cr.
Division Forccs.. ---------------------- _ _ ~0120\--~~~=-----~-
103,160 44
78,37012
1
TOTALS ____________________________ \$
Total Ai\otments _________________________ $
1~6954,~7337.9'5 :$!1~9~,3=9767~I_C___~I_-s_=_:~78-4,1~35~16
1
180
Schedule No. 14
STATE HIGHWAY BOARD OF GEORGIA
suM::MARY OF ACTUAL CONSTRUCTION ALLOTMENTS BY COMMISSIONERS DISTRICTS JUNE 30, 1936
~I District
Amount
CONSTRUCTION
Beginning of Department to June 30, 1933
-~-----
])!strict No. 1, 2, 3,
Southern __ ------------------ _]$ 45, 099, 763. 46
CentraL __ _ Northern __
~ ~ ~ ~ ~
~
~ ~
~ ~ ~
~
~ ~ ~ ~ ~ ~
~
I
~~: ~~~: ~~~: ~~
Total __ ___________________ I$ 128, 296, 608. 17
I
CONSTRUCTION Beginning of Department to June 30, 1936
District No. 1, 2,
3,
Southern_____________ __ ______ II$ 55, 008, 084. 16
CentraL ___ __ ____ ______ __ _____ 52, 734, 241. 62 Northern _____________________ '. 54,315,091.79
Total ___________________ ,I$ 162,057,417.57
l
CONSTRUCTION July 1, 1933 to June 30, 1936
District No. 1, 2, 3,
Southern __________________ ---1$
CentraL _______________________ _
Northern_____________ _______ -1
TotaL _____________________ I$
9,908,320.70 12,946,062.37 10,906,426.33
33,760,809.40
181
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS
BY COMMISSIONERS DISTRICTS JUNE 30, 1936
Schedule No. 14 Cont'd.
CONSTRUCTION July 1, 1935 to June 30, 1936
CLASS OF PROJECT
:x;
District
State
"' -N~i South;;~ [$--1,722, 8C8.l1 1$
2, CentraL_ _
3, 221, 511. 67
3, Northern __ -~
1, 243,450.03 I
Federal Aid
National
I
Recovery
l , [$ 302,885. ~~$- 268,270.47 1
321,078.09
905, 636.96 [
642, 162.45
309,229. 69
Works Program
I
Total
Allotments
350, 287~M~'$- -3,644: 25l. 70
181,391.44
4, 629, 618. 16
678,373. 88
2, 873,216.05
Totals_
_I$
- - - --- --1 6, 187, 769. 81-$
2_,266_,_1_,2_6~02-[$-
---1
-
-
1~483,
137.
12
-~~--
-----
---~
--
-210-,
(-)53-
96
_
$ _ 11, 147, 085.
==
91
-----
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 111
SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS!
JUNE 30, 1936
District
Distr. of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment Over Mileage Basis Distr.
Allotment Under Mileage Basis Distribution
---------------- -
CONSTRUCTION
Beginning of Department to June 30, 1933
>-"--CD C;.l
District No. L _
2 3 __
4_5 6_
7.8 9 ___ -
10 _____ --------
10,871,306.71
$
10,892,038.56
1$
10,742,890.83
11,146,744.96
11, 046, 651. 48
7, 935,376.54
9,309,850.36
9,964,556.45
2,334,163.38
2, 544, 008. 54
9,998,505.62
8, 786, 047. Hi
10,153,010.86
11,403,607.38
11, 358, 051. 59
9,000,583.50
13,510,537.71
17,887,880.50
9,824,491,57
8,626,887.71
20, 731. 85
403,854.13
~$
654,706.09 209,845.16
I 1-
1, .250, 596. 52
I
4,377,342.79
11_ ___ ----
12 ________ _
16,454,516.59 12, 692, 631. 47
18,925,685.12
2, 471, 168. 53
11, 183, 191. 75
__, ________ ---------
Totals__ - __ $ 128. 296. 608. 17 '$ 128. 296. 608. 17
___ _
~-===~= =~=1==- - ' = = = =
-------
I
1
----- ----
3, 111, 274. 94
-
1,212,458.46 2,357,468.09
-------
1,197,603.86 1,509,439.72
Schedule No. 15--Cont'd STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1936
District
Distr. of Total of Allotments on
Mileage Basis
Funds as Actually Allotted
Excess Allotment Over Mileage Basis Distr.
Allotment Under Mileage Basis Distribution
.....
(JJ
... District No. L __ _
----I 2
I
---- ---$
3
4
5
6. ----------
7_
8 __ _
g ____ _
10 __ _
11.-12_
Totals_
$
CONSTRUCTION Beginning of Department to June 30, 1936
13,666,528.31 13, 782, 781. 64 13,784,382.54 11, 683, 156. 17 3,029,005.50 12,547,295.75 12,699,024.32 14,353,710.51 17, 210, 605. 97 12,403,940.28 20,795,076.77 16, 101, 90!J. 81
162,057,417.57
14,157,152.38 13,137,374.00 10,680,436.95 12,328,875.22 4, 147, 961. 88 12,481,650.55 14,420,972.27 11, 632, 827. 45 20,915,775.47 10, 304, 396. 4:i 22,238,843.66 15, 611, 151. 31
I
i$ 162,057,417.57
490,624.07
-
645, 719,05 1, 118, 956. 38
--
1, 721,947.95
-----------
3, 705,169.50
1,44:3, 76G. 8D
i-
-I
-I
I
----
-----------
645,407.64 3, 103, 945. 59
---------------
------- --
65,645.20
2,720,883.06
-
2, 099, 54:i. 85
-
4fJO, 758.50
-
-- --
STATE HIGHWAY BOARD OF GEORGIA
8chedu\e No. \.fi-Oont.'d.
SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1936
_- = = - - - = - ' - - = = - - - - - - - - - c .. ==-=~-=- -----=-~=~~~--~---~-~--~.-=--=--=c==--~---=-~-- .c-.~=- -~----_~-
,-~-~-=-~-==--~~-~-~
~-cc=-.--
District
Distr. of Total of
Allotments on Mileage Basis
Funds as Actually
Excess Allotment
Allotted
I Over Mileage
Basis Distr.
I
Allotment Under Mileage Basis Distribution
CONSTRUCTION
July 1, 1933 to June 30, 1936
00-----
"" District No. L
2, 795, 221. 60
1$
---
-----~---
~-~~~~
-~---
3, 265, 113. 82
$ 1
.
469, 892. 22 I~~~~~~~ ~ ~ ~ ~. ~ ~ ~ ~ ~
2~~-
3, 039, 890. 81
I
1, 99o, 629. o4
1
1$-
1, 049, 261. 77
3~~
2, 737. 731. 06
2. 745, 060. 41
.
7, 329. 35
4~
2,373, 305.81
2,364,318.77
8,987.04
5~~~ ~~~~~
694, 842. 12
1, 603, 953. 34
1.
909, 111. 22
1.
6~~~~~~~-
2, 548, 790. 13
3, 6%, 603. 39
1, 146, 813. 26
~ ~ ~ .. ~ ~ ~ ~ ~
7~~~~~
2,546,013.46
3,017,364.89
471,351.43
I
8
2,995,658.92
2,632,243.95
~. ~~~~-~~~
~~,
363,414.97
9 ~
3,7oo,o68.26
3,027,894.97
~1
672,173.29
10~~~
2, 579, 448. 7l
1, 677, 508. 72
t ~ ~ . ~. ~ ~ ~ ~ . ~. ~ ~ ~ ~ ~ . ~ .. ~.
901,939.99
11_
4, 340, 560. 18
I
3, 313, 158. 54
~ ~ ~ ~~~~~~
~ ~ ~:
1, 027, 401. 64
12~ ~ .
-~-~409, 27~4~- ~--4,~27, 9~9_:~- ~ -[--- 1, 018, 681---=.___1 ~
Totals ~~ 1$
33,760,809.40
$
_I==~ ~~- -~ ~~~ ~=1
_ - - _==--_ 33,760,809.40
~~~~~~ ~~~~~ ~~~~ ~~~~~~~~~~~~~:~~~~ ~~~ ~~~~~~~~
-~====~~--==--~~
~=~-
-~--==
Schedule No. 16. STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS1
JUNE 30, 1936
District
Distr. of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment
Over Mileage Basis Distr.
Allotment Under Mileage Basis Distribution
.....
g; District No. ~
-1$
3
!:4 -----------1
~9~_--- -
I
12
CONSTRUCTION JULY 1, 1935 TO JUNE 30, 1936
945,223.49
$
983, 901. 77
903,062.52
812,229.21
238,047.33
848, 678. 87
827,323.67
965, 181. 31
1, 204, 221. 78
857,613.49
1,416, 808.45
1,144,794.02
1,482,988. 61 749,467.85
1, 310,394.94 734,485.34
511, 655. 36 1,068,367.51
728,630.03 403, 301. 83 963,649.69 506,815.98 1, 136, 610. 56 1, 550,718.:21
Totals____
$ 11, 147,085. !Jl
I______ ------
[ . - _ _ _ _ - - - -
11,147,085.91
537, 765. 12 407,332.42
----
273,608.03 219,688.64
405, 9:?4. HJ
234,433.92
----
-
77,743.87
98,693.64 561,879.48 240,572.09 :-350, 797. 51 280,197.89
----------
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 16-Cont.'d.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1936
District
Distr. of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment Over Mileage Basis Distr.
Allotment Under Mileage Basis Distribution
MAINTENANCE JULY 1, 1935 TO JUNE 30, 1936
>-' --------------------~----------------~-
CfJ
_, District No. L _____________ $
99, 905. 43
$
112, 302. 22
$
12, 396. 79
2--- ----------3______________
103, 782. 02 95,326.33
103, 481. 88 100,698.25
- -----------. - $
5,371.92
--------
300. 14
4_-- ----------5______________
85, 641. 65 25,112.29
80, 212. 58 21,099.94
----- . -- -
5,429.07 4,012. 35
6______________
7-------------8_------------9______________
89,481.59
87, 238. 27 101, 731. 33 126,983.23
92,426.06
82, 069. 26 96, 247. 22 117,671.98
2,944.47
----------------- ---
--
5,169.01
5,484.11 9, 311. 25
10______________ 11______________
12 _____________
90,404.41
149,334.82
120, 783. 47
I
95,341.15 153,939.29
120, 235. 01
___ ----
4,936.74
4,604.47 I __________ _
__ _- -~
548. 46
Totals ______ ~$-1~,~724~~$-1,175~:84~~~~ _ ~ - ---~~-- ---==( _ ~=~ =~-
STATE HIGHWAY BOARD OF GEORGIA
Schedule No.16-Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1936
District
Distr. of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment Over Mileage
Basis Distr.
Allotment Under Mileage Basis
Distribution
......
oo
I
00 District No. 1
-$
2 3 ____ _
4 __
5 6_
7
8 9 __ _ 10 _____ .
1L ________ _
12 _____ _
RECONSTRUCTION JULY 1, 1935 TO JUNE 30, 1936
56,472.59
$
58,232.56
53,633.60
47,987.86
14,096.86
50, 132. 68
48,892.84
56, 926. 55
71,172.95
50,610.46
83,567.29
67,834.51
20, 701. 27
36,718. 67 58,969.51
64,782.89 2,655.58 42,354.04 161,648.20
15,407.00
8,249.99 100,960.72 103,244.63 43,868.25
Totals
- \$-
659, 560. 75 ]$
659, 560. 75
--- ~ -=~---~ ~-=r__ ~---====-~-~
--------------------
5,335.91 16,795.03
112,755.36
50,350.26 19,677.34
35, 771. 32 21,513.89
11, 441. 28 7,778.64
- --
41,519.55 62,922.96
23, 9G6. 26
Schedule No. 16-Cont'd. STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1936
--------- ----
District
Distr. of Total of Allotments on
Mileage Basis
Funds as Actually Allotted
Excess Allotment
Over Mileage Basis Distr.
Allotment Under Mileage Basis Distribution
---------~------------1 - - - - - - - - - - ~- - - - - - - - - - - - --~--- - - - ~ - - -
SURVEYS July 1, 1935 to June 30, 1936
District No. L ___________ _ 2 ______ _ 3 ____________ _
4_----- ------5_-----------6 ____________ _ 7 _____________ _ 8 ____________ _ 9 ____________ _ 10 _____________ _ l l _____________ _ 12 __________ _
Totals ___ !_
-----;-~--~---~~----~---~----
1s, 1s2. 3s I,$
18, 869. 51
17,338.33
15, 568. 45
4,566.15
16,266.20
15,859.12
18,490.04
23, 084. 61
16, 432. 29
27,142.27
I
21, 963. 37
13,578.74
21, 256. 09 15,165.31
16, 229. 29 27,259.26 11,151.21 20,833.24 13,025.88
23, 595. 91 15, 184. 14
11,755.05 24, 728. 60
__________ _
$
2, 386. 58
660. 84 22,693.11
4,974.12
i'
511. 30
----- ----
II _ _ -
-
-------
2, 765. 23
_ 2-13~G2-:-72~1~~= - _ 21~_.7~~7=-=~l---~~~~---~~-----~---
4,603.64
2,173.02 ------ -----
5,114.99 ---------5,464.16 ----------1, 248. 15 15,387.22 --------------
--- ~~~~~~-~~-----
1
I
Schedule No. 16-Cont'd. STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASISJ
JUNE 30, 1936
District
-
f-' '-D
0
District No. 1 2 3 4_ 5 6 7_ 8 9 10 __ 11 12
Totals
Distr. of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment Over Mileage
Basis Distr.
------
----- - - - - - - - - - - - - --- - -
TOTAL ALLOTMENTS
July 1, 1935 to June 30, 1936
----
1, 119, 783. 89 1,164.785.86 1,069,360.78
961,427.17 281,822.63 1,004.559.34 979,313.90 1,142,329.23 1,425,462.57 1,015,060.65 1, 676,852.83 1,355,375. 37
----- ---
$
1, 629,570.84
910,924.49
1,485.228.01 895, 710. 10 562,670.14
1,214,298.82 993,180.73 527, 981. 93
1, 113, 167. 57 718, 301. 99
1,405, 549.53 1, 739,550.07
509,786.95 415,867.23 280,847.51 209,739.48
13,866.83
:-34, 174. 70
1:1, 1%, 1:14. :~2
$
1:3, 196, 134. 22
Allotment Under Mileage Basis
Distribution
I
253, 861. 37
1$
-
65, 717. 07
1-
IH4, 347. 30 312,295.00 296, 75R. 66 271, :103. 30
STATE HIGHWAY BOARD OF GEORGIA
Scb.edu\e No. U.-Oon.t.'d.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASISJ
JUNE 30, 1936
- . ____c---.-- ---c_c=--=-=====---------=-=-----==----_-_--_-_...cc=~-- ---
Other Allotments Undistributed
Administration Research ____________ _
Collection of Revenue _
Quarry _________ .. _-----
Shop_____
_________ _
Equipment
. ________ _
Motor Vehicle License Tags ____ _ Convict Farm _______________ _
Refunding Certificates_
.$
228,887.05
76.10
42, 181. 59
1,420.19
128. 67Cr.
11,758.03
57,822.73
2,660,585.12
Total Allotments July 1, 1935 to June 30, 1936--Exhibit "B" ______ _
_$ 16,198,736.36
STATE HIGHWAY BOARD OF GEORGIA ENGINEERING
STATE MILEAGE BY ENGINEERING DIVISIONS AT JUNE 30, 1936
STATE MILEAGE BY CONGRESSIONAL DISTRICTS
AT JUNE 30, 1936 -----=--==--c-:--:c=== - - = - : : - ----------------_,---~--
1
Cong. I No. of -~s~~- ~ounties
Area Sq._Mi1:_~
1 1
Population 1930 Census
:Mileage at 1 6-30-35
I Mileage at
i 6-30-36
1
'I
13
2
13
3
15
4
lO
5
4
6
13
7
13
8
13
9
18
10 I 12
ll
20
12 i 15
Totals_ 1=~59
I
6, 396 I
5, 528
4, 563 3, 777 1, 140
3, 614 4, 366
I 4, 193 '
I 5, 449 4, 657
~ 9. 465 I
j_5, 577__
[58, 725 ,
,
I
260,2911 242, 2761 189, 7191 2"0 708' 422: 2061 221,0501 262, 219 198, 927' 218, 4961 212. 9341 221418~._23990011
2, 908, 506]
773.4271----:::
812. 392! 815.642
743. 1791 750. 519
671. 766
671. 471
196. 448
207. 262
702. 02.5j 702.338
684. 073' 684. 266
799. 576
795. 936
995. 6261 986. 001
110. 0791
7os. 723
1. 173. 655 1. 167. 791
944. 183, 972.868
9, 206. 429: 9, 272.807
STATE MILEAGE BY COMMISSIONERS DISTRICTS
AT JUNE 30, 1936
-----------------
Co~m. I No. of
I
Area
1' Population
, Mileage at :Mileage at
j,
_DIst. I' Counties Sq. Miles 1930 Census 6-30-35
6-30-36
1
I 1
_ _5_6_ _ I 22, 916
2 ' 51
19, 561
846, 415 --3~128. 339 1 3, 189. 762 1
894, 1351', 3, 204. 5291 3, 211.241
3
I
52
16. 248
1. 167. 956 2. 873. 561, 2. 871. 804
Totals_ 159
58, 725
2, 908,5061 9, 206. 429 9, 272.807
1
1
192
Brantley County-llllaintained Roadway. State Route No. 50.
Pulaski County- Pulling Ditches and Shoulder Work, Hawkinsville-Perry Road.
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
Project I COUNTY I Eng. Cong.
Number
Div. Dist.
- - - - 1- - - - - .. - - --------
Chattooga_
2-B 20 21
Rabun.---CarrolL ____ Heard _______
21-C TrouJl-25 Candler __
42-A Chatham ___
>--'
47
Screven __
"m"
47-B Effingham.
52 Evans_
5:J-C Bibb __
53-D Bibb 58-B Jat~per __
60 Sttphcns_
74-A Sumter ___ 90-A Cook __
---1
- --r 101
Sumter ____ ---
11 :l
111-B rmon_ ------
116 walton __ 119 Ptekens_
-r
121-A Randolph
134
Coweta __
'
'i
138-A Warren
to
140-A Hancock
10
--
!54-A Wayn('_
It
I
'r
---------
------
I I
~roject I
COUNTY
Eng.
~~~~e~l _ _
Div.
154-B Wayne 155-B Hart___
------I
155-B Elbert
155-C HarL
158 Twiggs 164-C Sumter __
:I
167-B Chattahoochee_
...... 178 Murray_
"'__, 186-B Johnson 186-B Laurens_
190-B Murray __
194-C Fayette __ -----
196-C Clay __
i - - - - -
199 Quitman_
206 Tattnall
210-A , Jeff Davis
215-A Bank,_ 215-B Banks _______
215-C Bank~-
228-A Greene __
234 239
Camden __ Sumter __
-- i
----~
242 Polk
256-C Appling_
264
Early __
-I
I
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
Con g. Comm. Dist. Dist.
11 8 8
~~_I-';~; 1~::
7.~87
_______ _1 _____ ~--
:J. 721
Resurface
I
I Surface
I Treatment
1. (\4;')
I
I Bituminous Cement
Concrete _ -~oncrete
I
12
1174
:J
ti. \J20
12 12
7
I
11
.\UO ! 111.1:34
7 .Oi'i 1.2\Jti
11 3
11 2
Brick
Structures
.022
.o:Jo
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
Project
COUNTY
Eng.
Number
Div.
270 2/ti-B
~~~~~I~---~~~~~~~~~~ I
276-C 277 280
emon_ ___
I'
Ware __
Clayton ________ _
280 287
,_. 291
~~~,:;:~:~ - ~-:_-.I
WarP__
___
CD 00
299-A PulaRki_
299-E Wilrox
2fHI-F Pulaski__
317-A Lumpkin
:J17-C Lumpkin_
:123 Columbia
:J29 Hall __ _
:l42-A Twiggs __
:J43-B Randolph_
:H:J-C Handolph
:1.12-A Banks ___ _
:J5:J-B Montgomr'ry
;)55-A 'Yaync __
:)I5:l-A (;lynn_
374-B ~{'Wton __
374-C , XPwton_ 387-E II BurkP __
!
Con g. Dist.
Comm. Dis!.
Graded Earth
Top soil and
Sand Clay
Gravel and
Macadam
11
12 11 12 12 12 9
()
10
()
12 3
12
11
G. !\\14
11
I. !04
__i
I
I
Resurface I
I Bituminous
Concrete
1
Cement Concrete
ti.:!it)
W.iJJ
Brick Structures
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
I -Project
COUNTY
I Eng.
Number :J\!0-B C'ra\vford_
--1 Div.
.1!10-C l"pson_
:J\10-D Cra,,fonl_
:I
40H' Bl'rriln
4o:l-E Tift
4117-B NPwton 4111-F Atkin:'<lll_
I
...... 410-<i :Hkin~on __ ---
ccoo
412-E Tdfair ___ -----
412-F Telfair ____
--1I
418-E Crawfonl __
4111-B H<n HilL
422-C \\"hitficld
I
42.\-C Hab1nL
425-D Hahun ___
4211-D (;ordon_
I
428-A Bryan
428-B Bryan
I
428-D BryaH __
I
428-1: Bryan
428-F Bryan_
I
4:\3-C Harabln
4:34-.-\ ()conCl'_.
I
4:l7-A (}laMCOl'k_
437-C c;la~coek_.
Gong. Dist.
Comm. Dist.
Graded Earth
Top soil and
Sand Clay
Gravel and
Macadam
Resurface
Surface
Bituminous
Treatment Concrete
Cement Concrete
Brick
li
2. UHii
(i
ti. 2:18
II
4. 2/li
8. 271
. .1fi5
II
.1Jii8
II
8.124
12 12
Jil.li08
-----
I
I
\J. 4ti0
I
IO.tlli'
I --
I
--
1. U\Hi 11.242
I ;) ..1.58
I
l --
I
. i:2\!
I
284
I
I"
I
I
I
.1\J\1
I
I
1. llo
I
I I
411i
I I
1. fl n:~
I
----- I
I
I
i .214
I
1.\Hiii
I
111
2 8114
I
Ill
1.4711
I
Structures .1145
.06H .IIIIi .042
I
.1:111
I
. tn4 .IIIIi
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
I
Project
COUNTY
I Eng. Gong.
I Number
Div.
--~~--~- ~~~ ~-----
Dist.
44:l-F Jones ___ -------- ...
450-R Lincoln_
10
461-A Bacon
.:1 :l
II
461-B Appling ___
II
461-B Jeff Davis_
11
461-C Bacon
II
483-C Madison __
8
{\0 483-E Madison ______
8
0 0
486-A Tattnall___
486-C Tattnall__ _______
486-D Tattnal!___
488-A Floyd ____
491-B Bartow
492-A Dooly
492-C Dooly
2
4\!4-B Berrien ___________
II
495-A Quitman .. --- __ -
3
496--C GwinnPtt ___
496-D GwinnetL ...
496-E Gwinnl'tt ____ 499-D Houston ____
:1
9 12
499-E Macon
:;
500-B Worth __ 500-B Crisp _____
I 501-C Floyd _____
Comm, I Dist.
I
I I
Graded Earth
Top soH and
Sand Clay
I
---
I
Gravel
and
Resurface Surface
Macadam
Treatment
--- I
I - - -
:;.:;s:;
I
,) .--17:)
.).\)21
Bituminous Concrete
-
l. 271
I
i
I. 3\J I
ti.8Ui
ti.:!l\J I
--1.:;<,),)
8. 110 I
Cement Concrete
!
---------
---- I I
.J.)H
I
I I
I I
1,
I :z. I ill
II .IIIII
., 1S-t
-L /15 i.S:!-t
I
:; . s:ti
l.IIJ I
.,,,_
. \!77 :! .8;)7
:!.li:?O :'
Brick
I Structures I i
.Oil
' I
.1142
I
.2:Jo .1153
1,
.1.11
STATE HIGHWAY BOARD Of' GEORGIA
SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
Top soil
I Gravel
\ ~
Project
COUNTY
Eng. Cong. Comm. Graded
and
and I Resurface
Surface Bituminous
--------------- ----- - _-__--_- - Number
Div. Dist. Dist.
503-B Bulloch ___________
-~~---
Earth
Sand Clay Macadam
1 Treatment Concrete
~---- ~-- ----~ ~.~~~~~ r-~_(j~~~-
505-B Bleekley __________
i .807
Cement Concrete
_s::::_ \
Brick_l
1
-!I
505-C Twiggs.. _______ ._
1l.5(j(j
505-D Twiggs ___________
12
8.45\J
506-D Columbia __
10
.033
507-B Decatur ___
~~. !JOi
508-A MitchelL._~
4.1511
"" 508-B Grady _____
.0..... 510-C Burke______
511-A Wilcox_ __________
12
:3.:12.~
fi. 7H\J 4. 640
511-B Crisp ______
3
:3.252
512-C Schley _________
512-D Macon_
512-E Schley. ________ ._
u.034
514-C Thomas __________
.5 .397
515-B Coffee.... ________
11
5. 782
.087
517-C Meriwether~------
.104
517-C Pike _________
.103
518-C Harris ___________
.029
520-B 520-C 524-A 529-A 529-A 529-C
Taylor ___________ Macon ___________ Coweta __________ Barrow ___________
Jackson _________ Barrow ___________
---
1---
4.856
--- -----
----
----
-------- i
1--
5.291
r .109
.094 3.191
~----------
r~-~ .213
- --r-~
.038 .069
~------------
i
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
Project
COUNTY
Eng.
Number
Div.
532-B Calhoun __________
534-A DcKalb __________ 534-A Fulton ___________
534-B DeKalb __________ 534-D Fulton ___________ 535-E Fulton ___________
538-B Peach ________
"0 " ""
540-B 545 546
Hart__ ________
Tattnall__ ______ Bibb __________
548 Turner ___________
549 Habersham _______ 552 Taylor_ __________
553 Brooks ___________ 554 Upson ___________
555 Spalding _____ . ____ 2
556 Jenkins __________ _ 2
557 Clayton _________ _
570 Paulding ________ _
582-B I Warren _________ _
586 Harris ___________ _
586-B Meriwether _______ 1 589-C Jonca ___________ _
590-B Baldwin _________ _ 591 C Bryan ___________ _
1
Cong. Comm. Dis!. Dis!.
Graded Earth
Top soil and
Sand Clay
Gravel and
Macadam
Resurface
Surface Bituminous Treatment Concrete
Cement Concrete
Brick
Structures
2
.275
5
----
3.046
:::::::::::::::::::::::::::::::::::II
.430 5.108
.063
.016
.338
.039
12
8
.030
3
.063
9
6.368
6.666
11
.109
6
.021
6
:::::::::::: ------:3o6-- :::::::::::: :::::::::::: :::::::::::: :::::::::-- _:::::::~- _:-:::::::: I
.037 .030
10 4
6
10
r. } ::::::_-/:::::}_::_- -j-: - -_-_- ::::::::::::::::::::::::1
1:::::::::::: -----------
~:m4.m ------ --- --- ------- ----- -- I
:~o:__ - - -- -- ----- I .054
1-: -:: ::::}: ____
1 ,:::.::::.r 1 ;
ij,
SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION DURING FISCAL YEAR ENDING JUNE 30, 1936
Project
COUNTY
Eng.
Number
Div.
593-A 593-B 594 617
Burke ____________ Burke ____________ Burke ____________ Troup ____________
629-C Richmond ___ ----651-C Pike _____________
674-B Jones_-----------
""0
CAl
738-A Carroll__ _________ 755-A Banks ___________
755-B Jackson ____ - _____
771 Greene ___________
785-B Whitfield _________
786 Bryan ____________
787-C Talbot ___________
796 Burke ____________
806-D Whitfield _________
817-A Troup ____________
817-B Meriwether _______
832-C Appling __________
832-C Jeff Davis ________
835 Heard ____________
838-A 847-C 852 853-A
Gordon ___ ------Dooly ____________
Wilkinson ________ Coweta ___________
Cong. Comm. Dist. Dist.
Graded Earth
Top soil and
Sand Clay
Gravel and
Macadam
Resurface Surface
Bituminous
Treatment Concrete
Cement Concrete
Brick
Structures
.005
4. 236
2
.477
.477
2
.055
10
1. 936
6
1.827
1. 788
.416
. 915
.630
. 778
4.501
1.070
1.250
.190
1.949
.022
17.595
. 999
4
5.986
4
1.698
11
------------ ------------
1.265 ------------ ------------1----------- ----------- ------------
.005
11 4 7
:::::::::::: :::::::::::: _:-_:~::~~:: :::::::::::: :::::::::::1:::::::: -_: ::~:~;~-- -__::::::::: .048
10
: : : : : : : : : : : : --.J~~~-- : : : : : : ::-- -~~~-- :_::::::::::1:::_:::::::: ::::::::::::
.037 .019
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
==~============~=====-=-=-==================-~~=-==-~-~-====-====-~-==-=-=-==~--~~~-------=
Project
COUNTY
Eng. Cong. Comm. Graded
Top soil and
I Gravel
I
I
I
and
1. Resurface I Surface
Bituminous I Cement
Brick
I I Structures
Number
Div. Dist. Dist.
Earth
Sand Clay Macadam I
Treatment 1 Concrete Concrete
854-A 861 861-A 905-A 905-E 905-F
Henry............ Jefferson ......... Jefferson ......... Atkinson . . . . . . . . . Echols . . . . . . . . . . . Clinch ...........
10 10 II II II
,~, +1..\.......................................~."... 1----1........... --~1--- ---- ----~---- --~ ~~~=---- =:~~-~~ ~~~=~~~--
:::: I 1 ;:;:
.077 ............ ............ ............
i -
926 Evans ____________
N 9H-C Dodge..........
0
""
944-F Bibb............. 961-B Lincoln .........
I 12
2 :::::::::::: :::::::::::: ~:~!!
2 10
!::~~
1::::::::::. ::::::::::: 1::::::::::::
978-A Jasper------- _____
6
4.469
978-B Jasper........... 2
2
982 Dawson __________ 3
3
6.577
4.193
988-C Floyd............ 3
1.3II
990-A Floyd............ 998-C Fannin ___________
1003-A TattnalL ........
1003-B Candler..........
1009-B Stewart. .........
1013 Effingham .......
1016-C Colquitt.. ........ 1022-A ,Jenkins __________
1028-B Spalding .........
1031 Tift. ............. 1033-A Cherokee _________
-------- -----
Project I' Number I
COUNTY
Eng. Div.
IO:l4-A ~umtl'f __
IO:l4-H Crisp_.
j
JO:Jfi Crawford_
w:Ju-A Houston
lo:l~-ll Maeon
I
10411-.\ Jasper
1040-B Putnam_
I
1041-C Calhoun_
""0 1042-.\ Calhoun_
"' 104:1-A Towns_
I
10.12-B Douglas ___ 10.12-C Paulding_
I
:I
10.18-B Grady_
101i2-A Walker_._
101i!I-B Brantley_
I
1071-A Turr]{'r __
I
1071-H Irwin_
1072-A Irwin
I
1072-B BerriPn _
11176-A Puhu;ki_
1082-A Coffpr
I
1082-(' Atkinfion
1086 Clayton
10!111-B Decatur
I
Hl\14-A Dougherty_
Con g. Dist.
12 :l
11 11 11 11 12 11 11
STATE HIGHWAY BOARD Of' GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30. 1936
-------
Comm. Dist.
Graded Earth
Top soil and
Sand Clay I
Gravel and
Macadam
Resurface
Surface Bituminous Treatment Concrete
Cement Concrete
J
.:Jij[) I. \120
--- -10.112 I
l .027
I
.672
!
1.188
i .281
. GliO
.S:l:l
:l.408
.1 .:J:l9
I
4. lGG
071
. g:J7
I
I
I 1.!57:1
I
li.:l!lli
--
I. !188
I
1 .542
I
2 .os:J 2. 8118
I
1..1.\4 .1 .67:l 2. 2\l2 I
I
.1.4:n L\4!1 I
..)2\l
I
T
--1
I
I
--
I
I
I
i I
I
I
-- ~~-
---
I
I
--
I
i
i
:
Brick
Structures
.08:l
.004
.II:J8
I
.1104
I
---
. 11115
!
.080
i .1:)(\
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
Project Number
COUNTY
10\l/-.\ Taylor __
1091-B Taylor._
lllli Monnw_
1117 Columbia __
1118 Hart
lli8-B
I I
Hart..
1121
EmaJJtH'l __
"" 1122-B Julm::,on __
0 Cl
1U~-A
Ogldhoqw_
1124-B EllwrL_
1121i-A I.tlWildP~-
1126-H LaiJicr_
1.102-A C'larkc_
I.IO.o-A Crawford_ ...
1510-A MontgrmHTY
1510-H TrcntlrIJ __
I filii-.\ l'pt'Oil
1511
('alhollll __
l.i~l-.\ B<"a Hill
15:.!~-.\ I TPlfair_ 1.1~2-B CofTrr ____
l:l~-1-B i \Yorth
152~-.\ I Dougll('rty __ lS:lH-H I ('alhoun
t5:W-.\ 1\rn\1.
Eng. Con g. Div. -1-Dist.
Comm. Graded
I
Dist.
Earth
10
s
Top soil and
Sand Clay
.:1U7
Gravel and
Macadam
Resurface
I
.\l02 I .701 5.541
.:l\17 .:lti\1
12
2.\16.5
12
1.287
I
2. ()40
.274
1.274
11
. n:J2
:l.408
II
.206
2 .47.5
1.221
li
1.401
1:?
u .a!m
12
2. t) t:~
5. 142
u
I.IJ.tS
t.!nt 4 .ti/;)
II
11.11~8
""""I
1.54!1
I
11.270
):
.5.12:1
'
I '
:Li'40
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
Project 1 Number[
COUNTY
II Eng. D1v.
i 1
I
I I 1 Cong. Comm.l
Dist. Dist.
Graded Earth
Top soil
and Sand Clay
Gravel
and Macadam
Resurface
Surface
Treatment
Bituminous Cement Concrete Concrete
Brick
Structures
---[ -:-:-: -:-:-:=-: -:==-: === =-:-:= 1 ~;~ 1~effer~o;;-:-:-:=~- ;--~~-~~-~~-
-:~.
~~~-:-:-:~
------.;~- -~~-:= -:==~
1539-B I Douglas __________ I 3
.
[------------ _
.984 ------------ ___________ ------------ ------------------------------------
1542-A P1ercc ____________ [
:~!LA 1 ~;~~~~,:;,~~~~~~~::::[ II
I II I
I I~ I
[
.196 -----------
3.288 ------------ _____
___________ ------------------------ ------------
1--- 6.239 ---------- ----;:491)- :::::::::::: ::::::::: ::::::::: :::::::::::: :::::::::::: ::::::::::::
:m:: s::~~i~~;,: ::::j :
1:::::~:~~~:: :_ 3.522 ::::~:os~: :::::::::::: ___:::::::: :::::::::::: :::::::::::: ::::::::::::
~~:F ;~ >.;: '"' : -~ !l1t::m:~ I~~:~~,~-'_-_:-------
i ::
I I
i1::::"::::::::I:::::::::::: Tm ----------- ------------ ------------------------------------ .159
""' : .;~ ~ E . . :Er '":::~ eel1~~-1- , -~~~--111=~~~~~~~~=~~;~= - 3;;j::~=~=~~~ ~~~}~ ~~~~~~I----~~:~~s-- ----;:;~~-- ~~-~~~~ -2--
I=
--------------
STATE HIGHWAY BOARD OF GEORGIA MILEAGE PLACED UNDER CONSTRUCTION BY ENGINEERING DIVISIONS AND
COMMISSIONERS DISTRICTS DURING FISCAL YEAR ENDING JUNE 30, 1936
Number of
Projects
_______ :_
Type of Construction
Division and
District One
!Miles)
I I
Division and Division and
District
District
Two
Three
(Miles) I rMilesl
Total !Miles)
3H
Graded Earth __ _
4
Top Soil and Sand Clay
113
Gravel and Macadam__
84
Resurface_
10
Surface Treatment_
13
Bituminous Concrete_
2H
Cement Concrete_
2
Brick_
76
Structures__ _
368
TOTALS_
68.903
12.184
14.948
6.877
129.171
163.900
67.072
159.629
116.451
74.895
27.305
26.758
3.402
77.724
1. 974
40.158
46.936
1.173
1.798
1.444
.505
- - - - - ~---~---
~---
------
_ , 392.180
- 419.911
- - = =-=-=---~== _.::=__::_
1
1
96.035
I
6.877
360.143
350.975
54.061
81.126
89.068
1.17:-l
3. 747
1043.205
STATE HIGHWAY BOARD OF GEORGIA
MILEAGE PLACED UNDER CONSTRUCTION BY CONGRESSIONAL DISTRICTS
DURING FISCAL YEAR ENDING JUNE 30, 1936
===;=============;=====7'~=~---c=~--=~-~~=-----~--~c -~_~----~~~---~~~~~
Number
TYPE Of CONSTRUCTION
I Cong. Dis!.
Cong. Dist.
Cong. Dist.
Cong.
I Dist.
II Cong. I Dist.
II Cong.
' Dist.
II Cong. I Dist.
II Cong.
Dist.
1 ,
I \ \ \I Cong. \ Cong Cong
Dis!.
,
Dist.
1 ,
Dist:
Cong Dis!:
360 1 1 8 -~r_o_oief_ct_s ~-----~------~--~~
~~~f>lOjn~e~~~M.Tiw1eos)
~~Ti'h"_rseJe_ll
~MF,o.ui:~r")_
I
Five (Miles)
I Six
1
(Miles)
I Seven , !Miles)
1 Eight 1 Nine (Miles) 1 (Miles)
Ten (M1Ies)
I
1
(EMleIv~e~n~~I~T~w~~el)v-e\~~iTloetasl)~
38
Graded Eartk~~~~~~~~~~~
~~~ "
I 5l.l67 [10.796 UG.0.35
Top Soil and Sand Clay~~ 113 Gravel and Macadam_
~5: 31.6111 [ 821
:i~:38; [.~o.251l~~:l6~:~~~
84
10
.N.......
13 28
2
76
368
Resurface __ Surface Treatment_ ___ Bituminous Concrete Cement Concrete ____ Brick_~~~~~~~.---- -------------Structures __________
TOTALS ____
49.167 .\170 5.600
27.753
.fl92
.O:ll
.2631 .395 .0.\5
-~ - - - - - - - - - - - -~- . - - - -
I
140.144191.344 ,114.3\13 51.710'1 11.5\17
l =~c=~'~= ~ci~~c.=
I
I
I
36.847. 42.760 l':l50.\175 21.7o:l ~~~~~~~~~ 54.061
~~~ ~~42.756 81.12G
.787. 10.102189.068 . 728 1.173
I 1.0\11 .191, 3.747
til8liHI~~ :~~~5:~;-!~~-2~
Project No. 624-A- Coweta County- Concrete Bridge and Concrete Paved Approaches Eliminating Grade Crossing.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF BRIDGES PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
- - - - - - - - -=-------==--- _ - - - - ------=-------=-::--=~--_:---_-_===c=======:=========-=--=-=-=-=-=-=;=c.==--==c--=-----
Timber,
Concrete Concrete
I
1-Beams and
Timber
Bridge
Piers and Widened
Totals
Project
County
Eng.
Number ----- - -- -
Div.
60 138-A 140-A 154-B 158 194-C 199
.'.."...,.'.. 210
215-B 234 280 299-A 323
Rabun ....... Stephens _____________
'
\
7 \
a
r
r
e
n
______________
Hancock _____________
'\Vayne _ ----------
Twiggs __ --- --
I
Fayette ______________
Quitman _____________
Jeff Da,is-Tclfair _____
Banks --------------Camden _____________
Fayette-Clayton_
2&3
Pulaski ____
Columbia_
343-C Randolph.
355-A Wayne-Glynn
390-B Crawford
407-B Newton_
412-F 428-A 428-B
Telfair Bryan ___ Bryan __
428-F Bryan_
437-C' nla~cock
i
4o1-ll 486-C 486-D 488-A
Jeff Davi~ Tattnall .Tattnall - Floyd
I
~ I
I N u m b e r 1
Concrete Concrete Floors (Lin. Ft.)
Cong. Comm.
of Concrete and 1-Beams
(Lin. Ft.)
Culverts (Lin. Ft.)
Structural Steel
Concrete (Lin. Ft.)
(Lin. Ft.) I
~~!.-_Dis!._ _B_ri_dg.,._ _(L_in_._Ft_.J _(_L_in_._F_t._)- I - - - - - - - - - - - I
1
1
__ -~~F_t_.J_______ - - - - - -
3
I
200.0
200.0
48.0
46.0
94.0
10
158.0
200.0
10
::::::::::::1::::::::::
79 0
358.0 79.0
11
120.0
120 0
12
720
72.0
6
240.0
240.0
160 0
160.0
11&12
I, 660 0
I ,660.0
266.0 -
266.0
11
85 0
85.0
2&3
400.0
400.0
12
289.0
289.0
10
120.0
120.0
150 0
150.0
11
108.0
108 0
6
2
238.0
238.0
3 12
I
10
::"~})r~/)1 .JJ
11
__-_:~..:..:._:_:c =~-----~
STAT HIGHWAY IIOARD 01' 00ROIA SUMMARY OF BRIDGES PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936
I
I
Project [
County
Number
----1 - ~- -----
494-B I Bemen ________ _
499-E I Macon ___ _
506-D I Columbia ..
515-B Coffee ____ _
Timber,
1-Beams and
I
1 Number
I Concrete : Concrete Floors
I Eng. , Cong. Comm. \ of : Concrete 1and 1-Beams! ILin. Ft.)
~~v._ ~- [)j~_ ~--[)j~_ j_llridges I(Lin. Ft.) I _(i_i~-F~I 1
1 I 11 I 1 I
I
I
I 3I HI I
1
11 I
517-C Meriwether- Pike __
4&ti
518-C Harris_
4
520-C Macon ________ _
524-A Coweta___
-- 1
'"'>-' 534-ll Fulton
I
!OJ' 535-E Fulton
I
540-B Hart_
I
548
Turner_
553
Brooks __
11
554
Upson __ _
6
555
Spalding __ _
5Sii
Jenkins __
570
Paulding_
582-B Warren __
111
590-B 593-A 617 787-C 832-C 835 847-C 852 905-E
Baldwin.
10
Burke
I
1
Troup __
I
Talbot._
Appling __ Heard.
----1
1!
Dooly
Wilkinson_____
-:I
1~
E_ch_o_l_s_~---_-_--_-_-_-_ _ _~------~-~~-----
Timber !Lin. Ft. 'I
Concrete Bridge Culverts (Lin. Ft.)
Concrete Piers and Structural 1 Steel I Lin. Ft.)
Widened Concrete !Lin. Ft.)
Tota\s llin. Ft. I
800 0 1S7 0 17ti 0 4ti0 0 1.0911 0 158 0 202 0
:loD o
87 0 207 0 HiO 0 3:l4 0 520 0 1140 200 0 HiO 0 287 () 23 0 HiO 0 27 0 290 0 120 0 27 0 256 0 200.0 100 0 205 0
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF BRIDGES PLACED UNDER CONSTRUCTION
- - - - - --- ---
Project Number
County
Eng. Div.
Cong. Dis!.
DURING FISCAL YEAR ENDING JUNE 30, 1936
Numb..~~--. ~ -
I Concrete
Timber,
Comm. 1 of Concrete] and 1-Beams [ 1-Beams and
I 1
Dis!. ' Bridges (Lin. Ft.) (Lin. Ft.) Concrete Floors
_--1- __!_ _ _____ (lin. Ft.) ___
Timber (Lin. Ft.)
998-C 1028-B 1036 1039-A 1039-B 1040-A
"'...... 1042-A
0> 1052-B 1069-B 1082-C 1117 1121 1124-B 1126-B
1~10-A
1522-B 1528-A 1561-A M69-A 1578-A 1578-B
Fannin _____
Spalding __
Crawford ...
Houston... ______
12
Macon _______
3
Jasper_ _____ .. _.. _
2 1I :2::00-.0--1-.
Calhoun.. __
Douglas.....
Brantley. ____
Atkinson ____
Columbia _____
Emanuel ______
Elbert__ _____
Lanier ________
I
Montgomery ____ ----
Coffee _________ ----
Dougherty _______ ---- I
Laurena __________
Heard ______ ._
Jenkins __________
I
Burke _________
II
II
10
12
2
8
:;
11
12
II
12
lfiO.O 840.0 220.0
TOTALS...
i ----'------'------'----~~~~-~_I.3n_a_.o___I. 214 ~~----14. 694. o
Widened Concrete (Lin. Ft.)
Totals (Lin. Ft.)
100.0 440.0 22.0 200.0
21.0 28.0 234.0 426.0 75.0 100.0 140.0 22.0 34.0 240.0 160.0 140.0 160.0 364.0 874.0
STATE HIGHWAY BOARD OF GEORGIA LABORATORY
MATERIALS TESTED OR INSPECTED July 1,1936 to June 30,1936
------------- Kind of Material
I
~~~m -~;~~~ ~::::::::::::::::::-:::::::::::::: ~::::: ~
Asphaltic Limerock- ------ -- ___ - ___________________ _
Beams----- --------------- ---- --- --- - ---------------
Brick------------------------ - --------- ---------- - ---
cement ____ -----------------
--------------------
coarse Aggregate___________
________ _
concrete Core____
---- ----- --------- __
concrete Cubes---- ----------- . - - ________ ________ _
concrete Cylinders_________
________ _
concrete Pipe____________________ Copper Flashing_____________ . -corrugated Metal P1pe___________
---------------___________ _
___________ _
Expansion Joint_---Fertilizer ______ _
FGirlelearse(A__s_p_h_a__lt_)__-________ _
Guard RaiL---
Limerock ___ ------ .. -
on________
---------
PainL__ -Right of Way Markers ____ _
sand___
-----------
SteeL ______ _
Tar ______ _
Timber _____ _
Top Soil __ _
Water_ _________ _
TotaL ________ _
Number
896 39 16 62 87 2
2283 1132 738
1 2058
118 3
418 15 1 1 44 1 666 106 90 14 628 222 294 1 2885 125
12,946
217
STATE HIGHWAY BOARD OF GEORGIA
INDEX
A
Accounting-Alphabetical Index as Follows:
Page No.
Actual Allotments by Congressional Districts, Summary of
(1935)
_________________________________ Schedule 16 92
Actual Allotments by Congressional Districts, Summary of
(1936) _
---------------- _______________ Schedule 16 186
Actual Construction Allotments by Commissioners Districts, Summary of (1935) ----- ________________________ Schedule 14 89
Actual Construction Allotments by Commissioners Districts, Summary of(l936) ___________________________ Schedule 14 181
Actual Construction Allotments by Congressional Districts, Summary of (1935) _______________________________ Schedule 15 90
Actual Construction Allotments by Congressional Districts,
Summary of(1936) ------------------ _________ Schedule 15 183
Actual Construction Expenditures by Congressional Districts
and Division Units, Analysis of (1935) ________ Schedule 10-B 63
Actual Construction Expenditures by Congressional Districts
and Division Units, Analysis of (1936) __
_Schedule 10-Bl56
Administration Appropriation (1935) __ __ _____ Schedule 6-E 52
Administration Appropriation (1936) __
____ Schedule 6-F 143
Administration Expenditures by Object Classification, Analysis
of(1935) ______________________ _______
Schedule 8-A 55
Administration Expenditures by Object Classification, Analysis
of(1936) _ ________________
___ Schedule 8-A 148
Administration Expenditures by Units, Analysis of
(1935) _____________ _______________
______ Schedule 10-A 61
Administration Expenditures by Units, Analysis of
(1936)
__ Schedule 10-A 154
Administration Unencumbered Allotments by Units, Detail of
(1935) _
_________ _____ _____
___ Schedule 6-B 48
Administration Unencumbered Allotments by Units, Detail of
(1936)
_________ ____ ___________
___ Schedule 6-B 139
Allotments and Fund Balances, Reflecting Reconciliation with Expenditures, Summary of (1935) _____________ Schedule 6 44
Allotments and Fund Balances, Reflecting Reconciliation with
Expenditures, Summary of (1936) _ ____
_ Schedule 6 134
Assets and Liabilities, Statement of (1935) ______ Exhibit A
34
Assets and Liabilities, Statement of (1936)
___ Exhibit A 122
Comments ___________________________________________ ----- 11
Construction Allotments and Expenditures by Class of Project
(1935) ___ _ _______ _________ _
_Schedulel3 86
Construction Allotments and Expenditures by Class of Project
(19361 _ ____ ____________
__________ Schedule 13 178
Construction Allotments and Expenditures by Types
(1935) __
____________
____________ Schedule 12 85
218
INDEX-Continued
construction Allotments and Expenditures by Types
(1936) ___ - -- -------- ----- _______________ Schedule 12 177
construction Ex]Cenditures by Object Classification, Analysis
of (19351 -
--- Schedule S~B 56
construction Expenditures by Object Classification, Analysis
of (19361 -
- - -----
-_Schedule S~B 149
Equirment Exrenditures by Object Classification, Analysis of
(1935) _ --- -- ---- ------ -- ____________ Schedule8~D 58
Equipment Exrenditures by Object Classification, Analysis of
(1936) __ -
Schedule S~D 151
Equipment Unencumbered Allotments, Detail of
(1935) _
- Schedule 6~C 50
Equipment Unencumbered Allotments, Detail of
(19361 _
Scbedule 6~C 141
Estimated Participation, Reflecting Reconciliation with Rev~
enue Receipts, Summary of (1935)
__ Schedule 7 53
Estimated Participation, Reflecting Reconciliation with Rev~
enue Receirts, Summary of (1936)
__ Schedule 7 144
Expenditures by Congressional Districts, Summary of
(1935)
___ Schedule 9 59
Expenditures by Congressional Districts, Summary of
(1936) _
____ Schedule 9 152
Expenditures by Detail Object Classification, Analysis of
(1935) _ ______ ___
Schedule ll 74
Expenditures by Detail Object Classification, Analysis of
(1936)
Scbedule ll 168
Expenditures by Division Units, Summary of
(1935)
Schedule lO 60
Expenditures by Division Units, Summary of
(1936)
__ Schedule 10 153
Expenditures by Object Classification, Summary of
(1935)
_____ Schedule 8 54
Expenditures by Object Classification, Summary of
(1936)
_______ Schedule R 146
Fund Surplus, Reflecting Fund Revenue, Allotments and
Reserves, Reconciliation of (1935)
_. Exbibit B
36
Fund Surplus, Reflecting Fund Revenue, Allotments and
Reserves, Reconciliation of (1936)
_Exhibit B
124
General Maintenance Expenditures by Congressional Districts
and Division Units, Analysis of (193fi)
_Schedule 10~D 68
General Maintenance Exrenditures by Congressional Districts
and Division Units, Analysis of (1936)
_Schedule 10~D 162
Land, Buildings and Equi; ment (1935) _
Scl:tedule 4 41
Land, Buildings and Equi]: ment (1936) _
__Schedule 4 131
Legislative Transfer Exr: enditures by Object Classification,
Analysis of (19351
__ Schedule S~E 58
219
INDEX-- Continued
Legislative Transfer Expenditures by Object Classification
Analysis of (1936) _______
- Schedule 8-E
Maintenance Appropriation (1935)
_Schedule 6_D
Maintenance Appropriation (1936! ----- _-- --- .Schedule 6-D
Maintenance Expenditures by Object Classification, Analysis of
151
1541.~,
(1935) _______ - _______ - __ ---------- ----------_Schedule 8-C Maintenance Expenditures by Object Classification, Analysis of
57
(1936) ______ __ _-- ___ - ______ ---- -- ----------Maintenance Unencumbered Allotments by Units
Schedule fl-O and Congres-
150
sional Districts, Detail of (1935) - -- ___ - --- _Schedule 6-A Maintenance Unencumbered Allotments by Units and Congres-
46
sional Districts, Detail of (1936) ______ _ --- _ Schedule 6-A 136 Reconstruction Expenditures by Congressional Districts and
Division Units, Analysis of (1935)
Schedule 10-E 71
Reconstruction Expenditures by Congressional Districts and
Division Units, Analysis of (1936) _
Schedule 10-E 165
Refunding Certificates, Statement of (1935) ____ Schedule 5 42
Refunding Certificates, Statement of (1936) _- Schedule 5 132
Revenue Receipts and Expenditures, Comparative Statement
oL _
Exhibit D 128
Revenue Receipts and Expenditures, Statement of
(1935)
--- __ Exhibit C
38
Revenue Receipts and Expenditures, Statement of
(1936) _ __
________
____ ___ __ Exhibit C 126
Survey Expenditures by Congressional Districts and Division
Units, Analysis of(1935)
_____ Schedule 100 65
Survey Expenditures by Congressional Districts and Division
Units, Analysis of (1936)
.Schedule 10 0 15~
B
Bridges Placed under Construction, Summary of (1935)
115
Bridges Placed under Construction, Summary of (19361
214
G
Gasoline Tax, Distribution of, to Counties __
31
H
Highway Dollar, The (1935) _
37
Highway Dollar, The (1936) _
125
History of State Highway Board Membership __
8
L
Laboratory -Materials Tested or Inspected (1935) _
119
Laboratory-Materials Tested or Inspected (1936) _
217
Letter of Transmittal
__________________ _
220
INDEX-Continued
M
)fileage by Commissioners Districts (1935) _
96
)fileage by Commissioners Districts (1936)
192
)fileage by Congressional Districts (1935) __
96
)fileage by Congressional Districts (1936) __
192
)fileage bY Counties--Showing Commissioners Districts, Con-
gressional Districts, Engineering Divisions, Area, Population
and Percentages -- __ ______________ _
23
)fileage by Engineering Divisions (1935) _
96
)fileage by Engineering Divisions (1936) __ _
192
)fileage Placed under Construction, Summary of (1935) __ _
99
)fileage Placed under Construction, Summary of (1936) ____
196
)fileage Placed under Construction by Congressional Districts
(1935) - - ------- ------------------- -- ----------- -------- --- 112 :Mileage Placed under Construction by Congressional Districts
(1936) - - ---------------------------- ------------------------- 211 :Mileage Placed under Construction by Engineering Divisions and
commissioners Districts (1935) ________________________________ 111
Mileage Placed under Construction by Engineering Divisions and
Commissioners Districts (1936) _
__ _____________
209
0 Officials of State Highway Department __________________________ 10
221