Sixteenth report of the State Highway Board of Georgia to the Governor and General Assembly of the State of Georgia for the fiscal years ending June 30, 1935 and June 30, 1936 [June 30, 1936]

FOR THE

SIXTEENTH REPORT
OF THE
STATE HIGHWAY BOARD
OF GEORGIA
TO THE
GOVERNOR AND GENERAL ASSEMBLY
OF THE
STATE OF GEORGIA
FOR THE
FISCAL YEARS ENDING JUNE 30, 1935 AND JUNE 30, 1936

CONTENTS
PART ONE- INTRODUCTORY, COMMENTS AND GENERAL INFORMATION.
PART TWO- FISCAL YEAR ENDING JUNE 3oth, 1935. PART THREE- FISCAL YEAR ENDING JUNE 3oth, 1936.

PART ONE
INTRODUCTORY, COMMENTS AND GENERAL INFORMATION

To His ExcELLENCY, HoNoRABLE EuGENE TALMADGE, GoVERNOR OF GEORGIA, ATLANTA, GEORGIA. DEAR SIR:
In compliance with the law applying to the duties of the State Highway Board of Georgia, we are submitting to your Excellency for consideration, a brief report of the activities of the Board for the fiscal years ending June 30, 1935 and June 30, 1936.
The tables in this report give a comprehensive review of the activities of the State Highway Board for the two years covered in the report.
We wish to thank your Excellency for the splendid cooperation given us during our tenure of office.
Respectfully submitted, STATE HIGHWAY BOARD OF GEORGIA
ByVv. E. WILBURN, Chairman, MAx L. McRAE, Member, JOHN A. HECK, Member.

STATE HIGHWAY BOARD OF GEORGIA
HISTORY OF STATE HIGHWAY BOARD MEMBERSHIP 1916 THROUGH JUNE 30, 1936
The State Highway Department of Georgia was created by Act of Legislature, August 16, 1916, and a Highway Commission was appointed composed of the three members of the Prison Commission, together with the State Geologist, the Dean of the College of Civil Engineering of the State University, and the Professor of Highway Engineering at the Georgia School of Technology.
The original Highway Commission consisted of the following members:
T. E. PATTERSON, Chairman, Member of Prison Comm!sston.
E. L. RAINEY, l\Iember of Prison Commission.
J. E. DAVIDSON, Member of Prison Commission.
S. W. McCALLIE, State Geologist.
C. l\1. STRAHAN, Professor of Civil Engineering, State University.
R. D. KNEALE, Professor of Civil Engineering, Georgia School of Technology.
The above Commission served until the reorganization of the Highway Department, by Act of Legislature approved August 18, 1919.
This Legislature of 1919 provided that the State Highway Department of Georgia reorganized and reconstructed should be managed and controlled by the State Highway Board, which should consist of three members appointed by the Governor, one from each of three divisions of the State and the boundaries of each division were named. The term of office of initial appointees to be two, four and six years, after which each new member to serve s1x years.
The Appointments to the newly reorganized State Highway Board and their successors with term of office follows:
8

Name of Member

Title

Appointed By

Term Began Term Ended

Remarks

C. M. Strahan _________
Stanley S. Bennet ____
R. C. Neely ____________ John N. Holder_ ______ W. T. Anderson _______ Stanley S. Bennet_____ John R. Phillips ______ Sam Tate ________ W. C. Vereen __________ J. W. Barnett ________ J.P. Wilhoit___________
"' J.P. Wilhoit___________
J. J. Mangham ________ W. E. Wilburn _________ Max L. McRae ________ W. E. Wilburn _________ John A. Heck _________ John A. Heck _____ ---
-

Chairman __
Member ____
Member ____ Chairman __ Member ____ Member ____ Member ____ Chairman __ Member. ___ Chairman __ Member ____ Officer in
Charge ___ Chairman __ Member ____ Member ____ Chairman __ Member ____ Member ____

Governor Dorsey ___
Governor Dorsey ___
Governor Dorsey ___ Governor Hardwick Governor Walker ___ Governor Walker ___ Governor Walker ___ Governor Hardman Governor Hardman Governor Hardman Governor RusselL __
Governor Talmadge Governor Talmadge Governor Talmadge Governor Talmadge Governor Talmadge Governor Talmadge Governor Talmadge

Sept. 1, 1919__ Dec. 31, 192L Expiration of initial two year term.
Sept. 1, 1919__ Dec. 31, 1923_ Expiration of initial four year term.
Sept. 1, 1919__ Oct. 27, 1923_ Died in office. Jan. 1, 1922 _ June 2, 1929_ Succeeded C. M. Strahan. Nov. 1, 1923 __ July, 1925_ -- succeeded R. C. Neely. Jan. 1, 1924 __ Dec. 31, 1929 _ Reappointed. Aug. 1925 -- Dec. 31, 1933_ Succeeded W. T. Anderson. June 4,1929 Ar;ril1, 1930_ succeeded John N. Holder. Jan. 1, 1930 _ June 19, 1933 Succeeded Stanley S. Bennet. April1, 1930_ June 19, 1933 Succeeded Sam Tate. Jan. 1, 1932 __ June 19, 1933 Succeeded John R. Phillips.
June 19, 1933 July 20, 1933_ Appointed officer in charge. July 20, 1933_ Nov. 21, 1933_ Succeeded J. W. Barnett. July 20, 1933_ Nov. 21, 1933_ Succeeded J.P. Wilhoit. July 20, 1933_ Still in office succeeded W. C. Vereen. Nov. 21, 1933_ Still in office Appointed Chairman. Nov. 21, 1933_ Dec. 31, 1933_ Succeeded J. J. Mangham. Jan.1, 1934 __ Still in office Reappointed to full term.

OFFICIALS OF THE
STATE HIGHWAY DEPARTMENT

Name

Title

Location

W. E. Wilburn ________ Chairman, State Highway Board Atlanta Max L. McRae _______ Member, State Highway Board __ McRae John A. Heck ________ Member, State Highway Board__ Marietta F. P. Vanstory_______ Secretary and Treasurer, State
Highway Board ________________ Atlanta B.S. Miller_ __________ Assistant Attorney-GeneraL ____ Atlanta H. E. Newton_________ State Highway Engineer ________ Atlanta

10

ACCOUNTING
The section of this Annual Report devoted to statements from the Treasurer reflects the financial condition and activities of the State Highway Board for the fiscal years July 1, 1934 to June 30, 1935 and July 1, 1935 to June 30, 1936. The fiscal year ended June 30, 1935 is included in Part Two and the fiscal year ended June 30, 1936 is included in Part Three. Each section is composed of separate Exhibits and schedules for the year.
The financial condition of the State Highway Board, at the close of the fiscal year, is reflected in Exhibit "A," Statement of Assets and Liabilities. A Reconciliation of the Fund Surplus, reflecting Fund Revenues, Appropriations, and Allotments, is given in Exhibit "B." Exhibit "C" reflects Revenue Receipts and Expenditures. Exhibit "D" in Part Three is a Comparative Statement of Revenue Receipts and Expenditures for fiscal years ended June 30, 1933, 1934, 1935, 1936. These Exhibits are supported by various Schedules, which analyze the financial results for the fiscal years.
EXHIBIT "A"
STATEMENT OF ASSETS AND LIABILITIESFUND BALANCES
CURRENT FUND POSITION
A comparative summary as taken from Exhibit "A," of the current financial condition at June 30, 1935 and June 30, 1936, is presented as follo\\s:

Description

June 30, 1936

ASSETS Current Assets ________________ $7,263,570.05 Deferred Assets________________ 213, 830. 03
TOTAL ____________________ $7,477,400.08

LIABILITIES & FUND BALANCES
Current Liabilities ____________ $ 600, 000. 00 Fund Balances________________ 3, 827, 921. 84
TOTAL ____________________ $4, 427, 921. 84

FUND SURPLUS Available Surplus______________ $1,319,948.09 Surplus Deficit _______________ _ Surplus Reserves______________ 1, 729,530.15
TOTAL ____________________ $3,049,478.24

TOTAL ____________________ $7, 477, 400. 08

June 30, 1936
$6,702,483.65 215,633.91
$6, 918, 117. 56
$ 600,000.00 5,095,803.74
$5,695,803.74
$ 624,075.75 1,846,389.57
$1,222,313.82 $6,918, 117.56

11

The fund surplus balance at the close of the fiscal year constitutes State funds and is exclusive of the available balance of unallotted Federal funds. The available Federal funds (representing funds against which contracts had not been let) on June 30, 1935, amounted to $2,751,781.21 and on June 30, 1936, amounted to $12,265,599.96.
In arriving at the available surplus or deficit balance at the close of a fiscal year provision is made not only for all actual liabilities; but also, for contractual obligations not yet matured, including outstanding purchase orders, balance of specific allotments for State Force work, and surplus reserves. Consideration is given to amounts due from participating agencies only when corresponding contract is let and liability accrued. A surplus acts as an enhancement to the revenue for the succeeding year; whereas, a deficit is forwarded to the succeeding year as an encumbrance.

CAPITAL ACCOUNT POSITION

Capital investments, liabilities and surplus are shown in a

separate section of Exhibit "A" and are not considered in the

current financial position. The capital account items as of

June 30, 1936 are summarized as follows:

June 30,

Description

1936

---

CAPITAL INVESTMENTS

Land, Buildings and Equipment ____________ $ 1, 261, 293. 09

Roads and Bridges

Construction cost to date _________________ 154,290,541.24

W. & A. Rental Warrents__ _____ ________ __ ___ 1, 620, 000.00

Total Assets _____________________________ $157, 171, 834. 33

CAPITAL LIABILITIES Highway Refunding Certificates. ___________ $ 23, 957, 085.44

CAPITAL SURPLUS Surplus Invested in Plant and Equipment __ $ 1, 261,293.09 Surplus Invested in Highways _____________ _ 130,333,455.80 Surplus Invested in W. & A. Warrants _____ _ 1,620,000.00
Total Surplus __________________________ _ $133,214,748.89
Total Liabilities & Surplus ______________ $157, 171, 834. 33

Fixed Assets, representing land, buildings, and equipment, are appraised at the close of each fiscal year and their values adjusted through Surplus Invested in Plant and Equipment. Additions and replacements during the year are charged as outlay expenditures but capitalized at the close of the fiscal year and credited to Surplus Invested in Plant and Equipment.
Roads and Bridges, construction cost to date, represents total expenditures since the beginning of the State Highway Board of
12

Georgia. During the fiscal years ended June 30, 1935 and June 30, 1936, construction cost to date was increased in the amount of $21,915,902.54 as follows:

Roads & Bridges, construction Cost to June 30,1934 ___________ _

$132,374,638.70

Construction Expenditures Fiscal year ended June 30, 1935 __ Fiscal year ended June 30, 1936_ __ _

$ 11, 380, 060. 33 10,535,842.21

$ 21,915,902.54

Roads & Bridges, construction Cost to June 30, 1936

$154, 290, 541. 24

W. & A. Rental \Varrants represent \Vestern and Atlantic Railroad Rental Assignment \Varrants, due monthly from January 1, 1941 to December 1, 1943, inclusive, and purchased at face value by the State Highway Board of Georgia; in accordance with the provisions of an Act of the General Assembly of Georgia in 1931.
The Act provides that the Governor and the State Highway Board of Georgia are authorized to sell the warrants to match regular Federal Aid or any emergency fund which might be offered the State Highway Board by the Federal Government.
State of Georgia, Highway Department Refunding Certificates are in accordance with the provisions of an Act of the General Assembly of Georgia, approved ~larch 1, 1933, and as amended by another Act approved l\larch 22, 1933. These certificates are for the purpose of refunding to the several counties of this state and the Coastal Highway District, funds advanced for construction of roads on the State Highway System, under the supervision of the State Highway Department prior to September 1, 1931. Ten per cent of the total amount was due and payable on March .31, 1936 and each year thereafter for ten years. The certificates are transferable but non-interest bearing.
The total outstanding certificates on June 30, 1936, amounted to $23,957,085.44 as shown in Schedule No.5, Part Three.
Capital surplus which is a contra to capital investment accounts has been split into three accounts; namely, Surplus Invested in Flant and Equipment, $1,261,293.09, Surplus Invested in Highways, $130,333,455.80, and Surplus Invested in W. & A. Warrants, $1,620,000.00. Capital surplus represents the an;m:.nt from revenues invested in property and should not be confused with the current surplus, which is essentially a surplus of money, having to do with cash or with resources expected to become cash, such as accounts receivable and similar items.
13

EXHIBIT "B" RECONCILIATION OF FUND SURPLUS
This exhibit reconciles the Fund Surplus at the beginning of the year with the Fund Surplus at the close of the year, and thereby reflects the Fund Revenue as accrued, Appropriations, Allotments, and Reserves.
EXHIBIT "C" STATEMENT OF REVENUE RECEIPTS AND
EXPENDITURES REVENUE RECEIPTS
A comparative summary with relative percentages as taken from Exhibit "C," of the Revenue Receipts for fiscal years ended June 30, 1935 and June 30, 1936, is presented as follows:

Year Ended

I

Year Ended

__ Jun~ 30, 1935 __ i__~n~ 30, 1936

Description

Percent I

I Percent I

to Total . Amount to Total Amount

~~~!!~:~asurer ~~5% n[~7% 1

_

l$1o, 861, 127.

1$11, 796,406. 19

Counties, Cities '

1

& Railroads______ 00. 17 ..

28,446.52. 00.06

9,245.77

Federal

Government_____ 36.35 :1 6, 232,390.34 1 23.96

3,720,834.77

Miscellaneous

[

Income __________ 00.13 I

1
22,757.91 00.01

1,442.13

1
TOTAL __________ 10o:DQ%I$17,144,722.4sl 100. 00% 1$15,527,928.86

STATE FUNDS
Reveune receipts from State funds are entered on the records when credit is passed to the State Highway Board of Georgia by the State Auditor and not when the funds are remitted on executive warrant. This revenue therefore represents the State Highway Board's pro-rata share of collections as made by the State Treasurer and includes at all times the unremitted balance of State funds due to the State Highway Board of Georgia.
An analysis of State funds is as follows:

Description

Year Ended June 30, 1935

Year Ended June 30, 1936

Motor Vehicle Fees______________ $ l, 206, 051. 30 Gasoline Taxes__________________ 9, 655, 076. 41

$ 1,392,012.38 10,404,393.81

TOTAL ______________________ $10, 861, 227. 71

$11,796,406.19

14

Motor Vehicle Fees represent collections from motor vehicle license tags and common carrier mileage and license fees; as credited to the State Highway Board of Georgia. These credits reflect an increase for the year ended in 1936 as compared with the year ended in 1935 of $185,961.08.
Gasoline Taxes represent the State Highway Board's pro-rata share of collections under the Fuel Oil Tax Law. These credits reflect an increase for the year ended in 1936 as compared with the year ended in 1935 of $749,317.40.

COUNTIES, CITIES AND RAILROADS Revenue receipts from this source are analyzed as follows:

Description

Year Ended June 30, 1935

Year Ended June 30, 1936

Counties____________________

$17,900.40

Cities____________________________ 1,000.00

Railroads________________________ 9, 546. 12

$ 785.00 5,339.35 3, 121. 42

TOTAL ______________________ $28, 446. 52

$9,245.77

Revenue receipts from counties and cities represent contributions in connection with construction work; whereas, receipts from railroads reflect participation in the elimination of grade crossmgs.

FEDERAL GOVERNMENT
Revenue receipts from the Federal Government are analyzed as follows:

Description

Year Ended June 30, 1935

Year Ended June 30, 1936

National Recovery Vouchers ____ $6, 187, 103.47

Works Program Vouchers ______ _

Other Federal Vouchers_________

45, 286. 87

TOTAL______________________ $6, 232, 390. 34

$3,038,813.82
354,522.20
327,498.75
---
$3,720,834.77

Federal funds allotted to the State Highway Board of Georgia are considered under revenue receipts only as expenditures on Federal projects are made and the corresponding reimbursement vouchers are forwarded for collection to the Bureau of Public Roads.
Appropriations of Federal funds are recorded on the records as Estimated Revenue when notice of apportionment is received from the Bureau of Public Roads.
15

A reconciliation of unallotted balances, Federal funds, is as follows:

Description

Year Ended June 30, 1936

Year Ended June 30, 1936

Unallotted Balance beginning of year _____________ $3, 540, 810. 36

$ 2, 751, 781. 21

Federal Apportionments National Recovery Funds ____ _ National Forestry Funds. ____ _ Flood Relief Funds (Lapsed) __ Works Program Funds _______ _ Federal Aid Funds .. __________ _

5, 113, 491. 00 39,777.78 21, 624. 58Cr.

3,850.00 12, 171. 04Cr. 9,884,916.00 3, 168, 221. 00

TOTAL ________________ . _____ $8, 672, 454. 56 Allotted to Projects_____________ 5, 920,673.35

$15,796,597.17 3,530,997.21

Unallotted Balance end of year ___________ . _______ $2, 751, 781. 21

$12,265,599.96

The unallotted balance is dropped at the close of the fiscal year with the elimination of unrealized estimated revenues; however, it is included and recorded in the succeeding year as part of the estimated revenue for that year.
When contracts are let the Federal funds specifically allotted to the projects are recorded as Construction Estimated Participation. Reimbursement vouchers are credited and the balances adjusted to actual participation upon completion of the projects.
A reconciliation of the estimated participation accounts, Federal funds, is as follows:

Description

Year Ended June 30,1936

Estimated Participation beginning of year _____________ $3, 855, 717. 79
Allotted to Projects_____________ 5, 920, 673. 35

Year Ended June 30, 1936
$3,544,000.80 3,530,997.21

TOTAL ______________________ $9,776,391.14 Reimbursement Vouchers_______ 6, 232,390.34

$7,074,998.01 3,720,834.77

Estimated Participation end of year. ___________________ $3, 544, 000. 80

$3,354,163.24

The estimated participation balances on June 30th are shown in Exhibit "A" as a deduction from contractual obligations on Federal projects. This reduces the contractual obligations to a net State liability.
16

Federal funds apportioned to the State Highway Board of Georgia since the beginning of the Department are as follows:
Etegular__________________________ $36,927,494.80
National Etecovery, 1934. _________ 10,091,185.00 National Etecovery, 1935__________ 5, 113,491.00 Works Program__________________ 9, 884,916.00 Emergency Advance_____________ 2, 077,996.00 Emergency--------------------__ 3, 123,298.00 Flood EtelieL____________________ 471,371.88 National Forestry_______________ 114,659.62
TOTAL ____________ .. ________ $67, 804, 412. 30

The Federal Aid apportionment in the amount of $3,168,222.00 for fiscal year ended June 30, 193 7 has not been included in the foregoing figures.
MISCELLANEOUS INCOME
Represents revenue receipts from sundry and miscellaneous sources in the amount of $22,757.91 for fiscal year 1935 and $1,442.13 for fiscal year 1936.
EXPENDITURES
A comparative summary with relative percentages as taken from Exhibit "C," of the Expenditures for fiscal years ended June 30, 1935 and June 30, 1936, is presented as follows:

Description

Year Ended June 30, 1935
Percent I to Total Amount

I
Year Ended
I June 30, 1936
--~---
Percent
to Total I Amount

EXPENDITUEtES I Administration ______ 01. 85% $ 280, 061. 71

Construction________ 76.67 11, 619, 991. 31

Maintenance ________ 07.76

1,176,073.22

Land, Buildings &

Equipment ________ 00. 12

18,695.01

Legislative

Transfers__________ 13.60

2,060,606.62

Redemption of

Refunding

Certificates ________

I 01. 82% $ 274, 359. 58
71.06 10,746.251.51

09.14

1,382,836.80

00.07

11, 051. 25

00.40

60,597.73

17.51

2,648,765.80

-----
TOTAL ________ 100.00% $15,155,427.87 100.00% 1$15,123,862.67

~~~=

Comments upon the various expenditure classifications are next in order as they appear in the foregoing summary.
17

ADMINISTRATION
Administration is the function of management or direction and consists of the general planning, the establishing of policies, the issuance of orders and instructions, and the control of the forces and work which they are doing, both in the general office and division offices.
Administration expenditures are analyzed as follows:

Description

Year Ended June 30, 1936

General Administration General Office _________________ $197, 599. 85
Division Offices________________ 28, 760. 34 Warehouse_ ___________________ 13, 348. 89

TOTAL ____________________ $239,709.08

Research______________________ Collection of Revenue_________ Quarry________________________

175. 39 39, 020. 14
1, 157. 10

TOTAL_ ___________________ $280, 061. 71

Year Ended June 30, 1936
$187,368.42 29,513.22 13,547.32
$230,428.96
329.79 42, 181.59
- -1,-419.24
$274,359.58

The Administration cost for fiscal year 1935 expressed in percentage to total expenditures is 01.85% and for fiscal year 1936 the percentage is 01.82%.
Detail analyses of Administration expenditures may be found in Schedules No. 8-A and No. 10-A.

CONSTRUCTION Construction expenditures are analyzed as follows:

Description

Year Ended June 30, 1936

Surveys Actual Surveys ________________ $ Plans _________________________ _
TOTAL ____________________ $

151,592.66 88, 338. 32
239,930.98

Construction Supervision ____________________ $ 444,001.33
Direct _________________________ 10,936,059.00

TOTAL ____________________ $11, 380, 060. 33

TOTAL ____________________ $11, 619,991.31

Year Ended June 30, 1936
$ 117,193.39 93,215.91
$ 210,409.30
$ 427, 189. 58 10,108,652.63
$10,535,842.21 $10,746,251.51

18

Survey expenditures represent a preliminary construction cost. The charges are presented to show the cost of actual surveys separate from the cost of plans prepared in the General Office.
Detail analyses of Survey expenditures may be found in Schedules No. 8-B and No. 10-C.
Actual Construction expenditures are separated into two classes; namely, supervision charges and direct charges.
Supervision is the function of engineering and inspection and consists of furnishing inspection while the work is in process, testing materials, preparing monthly statements and reports, and such other operations of a strictly engineering nature.
Direct is the function of actual building costs for roads and bridges and consists of contractual payments, and in the case of work done by State forces, the furnishing of labor, materials, supplies, etc., used in the work.
Supervision cost for fiscal year 1935 as expressed in percentage to Construction direct expenditures is 04.06% and for fiscal year 1936 the percentage is 04.22%.
Construction allotments (representing estimated cost of work let to contract or begun by State forces) amounted to $11,300,914.13 for the fiscal year 1935 and $11,147,085.91 for the fiscal year 1936.
A summary of Construction balances, allotments and expenditures are as follows:

Description

Year Ended June 30, 1935

Year Ended June 30, 1936

Unexpended Balances, beginning of year _____________ $ 7, 152,344. 89
Construction Allotments ________ 11,300,914.13

$ 7,054,674.53 11,147,085.91

TOTAL ____________________ $18, 453,259.02 $18,201,760.44

Construction Expenditures _____ $11, 380, 060. 33 $10,535,842.21

Unliquidated Encumbrances____ 18, 524. 16

53,183.97Cr.

TOTAL ____________________ $11, 398, 584. 49 Unexpended Balances,
end of year ____________________ $ 7, 054,674.53

$10,482,658.24 $ 7,719,102.20

Detail analyses of Construction expenditures may be found in Schedules No. 8-B, No. 10-B, No. 12 and No. 13.
19

MAINTENANCE

Maintenance expenditures are analyzed as follows:

Description

Year Ended June 30, 1936

Year Ended June 30, 1936

General Supervision ___________________ $ 62, 910. 83 Direct _________________________ 1,098,943.18

$ 54,794.60 1,082,938.23

TOTALS___________________ $1,161,854.01

$1,137,732.83

Reconstruction

Supervision ____________________ $

16.72

Direct_ ________________________ 14, 202. 49

$ 2, 698.49 242,405.48

TOTALS_ __________________ $ 14, 219. 21 TOTALS ___________________ $1,176,073.22

$ 245,103.97 $1,382,836.80

Maintenance disbursements are divided into two sub-activities; namely, General Maintenance and Reconstruction.
General Maintenance represents the ordinary or routine maintenance work; whereas, Reconstruction represents special maintenance work consisting of extraordinary repairs, replacement or reconstruction. There is very little distinction between these two sub-activities as both reflect expenditures necessary in keeping each type of roadway, structures and facilities in"'?'a usable condition.
Maintenance expenditures are also separated as to supervision charges and direct charges. These two functions are the same as commented upon under Construction expenditures.
Detail analyses of Maintenance expenditures may be foundin Schedules No. 8-C, No. 10-D and No. 10-E.

LAND, BUILDINGS AND EQUIPMENT Land, Buildings and Equipment expenditures are as follows:

Description

Year Ended June 30, 1936

Land_____________________________ $ 150. 00 Buildings _______________________ _ Equipment______________________ 18, 545. 01

TOTAL____________________ $18,695.01

Year Ended June 30, 1936
$11,051.25 $11,051.25

Expenditures represent the purchase of additions and replacements and a detail analysis, classified as to detail object of expenditure and function to which assigned, may be found in Schedule No. 8-D.
20

LEGISLATIVE TRANSFERS

Legislative Transfers are analyzed as follows:

Description

Year Ended June 30, 1935

Year Ended June 30, 1936

Transfer to General Fund

1935 AcL ___ ------------------- $2, 000, 000. 00

Prison Farm Purchase- ---

546. 93

Motor Vehicle License Tags_____ 60,059.69

$ 2,775.00 57,822.73

TOTAL _______ - ____ - _-- ____ $2, 060, 606. 62

$60,597.73

Expenditures classi~ed as Tra~s~er To General Fund-1935 Act is in accordance w1th the prov1s1ons of an Act of the General Assembly of Georgia in 1935. The Act provides that the State Highway Board shall pay into the general fund of the State Treasurer, $2,000,000.00, of the State Highway funds.
Expenditures classified as Prison Farm Purchase represent payments made in accordance with the provisions of an Act of the General Assembly in 1931. This Act made available the amount of $200,000.00 from any funds allocated to the State Highway Board of Georgia, for the purpose of buying lands and equipping a prison farm. The fund to be expended when the same might be necessary in the judgment of the Prison Commission of Georgia and concurred in by the Governor.
Expenditures to June 30, 1936 are as follows:

Description

Amount

Allocation of funds ______________ _

Expenditures

For Fiscal Year 193L ____________ $ 2, 109.80

For Fiscal Year 1932 _____________ 124,186.93

For Fiscal Year 1933_____________ 5, 118.76

For Fiscal Year 1934_____________ 2, 719.85

For Fiscal Year 1935_____________

546.93

For Fiscal Year 1936_____________ 2, 775.00

$200,000.00 137,457.27

Unexpended balance, June 30, 1936

$ 62,542.73

The unexpended balance is carried in Exhibit "A" as a Fund balance.
Expenditures classified as Motor Vehicle License Tags represent transfers of funds to the Prison Commission and Revenue Commission to cover the cost of tags and postage. These transfers are in accordance with the provisions of an Act of the General Assembly.
21

REDEMPTION OF DEBT-REFUNDING CERTIFICATES
Expenditures classified as Redemption of Refunding Certificates, in the amount of $2,648,765.80, represent redemption of State of Georgia, Highway Department Refunding Certificates due on l\Iarch 25, 1936. Certificates due on March 25, 1936 but not presented for payment prior to June 30, 1936 amounted to $11,819.32.
GENERAL
Under this Budget System, the accounts in the Treasurer's Office are not limited to the actual assets and liabilities, but include resources in the form of unearned estimated revenue for the fiscal year; likewise, other obligations in the form of appropriations of these revenues, specific allotments of the appropriations and encumbrances of the allotments.
The accounts representing unrealized fund resources and the commitments of these resources are known as "Fund" accounts. These fund or budget accounts are necessary as the activities of the State Highway Board are carried on in accordance with limitations and estimates set up in the Budget.
A Balance Sheet and correlative statements are prepared monthly from the accounts. These financial statements are of great value as they reflect the exact financial condition on their respective dates; also, the budget position for the balance of the fiscal year.
All transactions affecting allotments, accounts payable, and disbursements, are recorded. By the use of collating forms several records are prepared in one operation and at the same time all account balances are automatically computed and all cofumns automatically totaled. Notwithstanding the fact that the volume of detail handled is very large, accurate statements are rendered promptly.
Additional analyses of all expenditures are obtained through the use of an electric tabulating machine in the Statistical Department. The detail expenditures and accumulated construction costs are analyzed so as to furnish information regarding source of funds, cost, location, type and mileage of projects; also, object of expenditure, unit and activity classifications.
At various times the Accounting Department is called upon for numerous financial and statistical reports which are compiled promptly and accurately without delay or confusion; however, the preparation of same would be very difficult without the present system and tabulating equipment.
An audit has been made of this Department by the State Auditor for the period ended December 31, 1935, and the records were found in order, all funds being properly disbursed. The fullest cooperation has been received from the State Auditor's office, and as stated in the last report, many beneficial suggestions were made by the examiners.
22

ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE

County

I I Eng. Cong. Com.

Div. Dist. Dist.

- -- -

Appling____ ------- --- 1 11

1

BBAaatkkcioenrns__o___n_________-_----

-----

-

-

-

-

-

-

-

-

1 1
1

11 11 2

1 1 1

BBaalndkwsi_n_____________________-_-_-_-_-_-_-

2 3

lO
9

2 3

Barrow __________________ 3

9

3

Bartow __________________ 3

7

3

Ben HilL ________________ 1

3

1

Berrien __________________ 1 11

1

Bibb ___________________

2

6

2

Bleckley ________________ 2 12

2

Brantley_________________ 1 11

1

Brooks________ .. __________ 1 11, 1

Bryan____________________ 1

1

1

Bulloch__________________ 2 1 2

Burke ___________________ 2

1

2

Butts ____________________ 2

6

2

Calhoun_________________ 1

2

1

Camden _________________ 1 11

1

Candler _________________ 2

1

2

CarrolL _________________ 3 4 3

Catoosa__________________ 3

7

3

Charlton __________ Chatham ____________

-

-
-

---

-

1 1

11 1

1 1

Chattahoochee__________ 2 4 2

Area Sq. Miles
454 330 271 357 307 222 168 471 256 455 277 205 434 514 431 668 956 203 284 711 228 492 169 792 370 218

Pop. Per

Per- Per- Per-

Pop. Sq. Mile

cent- cent- cent-

1930

1930 Mileage Mileage Mileage age age age

Census Census 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36

13,314

29

62.805 63.025 61.720 .7076 .6846 .6656

6,894

21

49.343 49.343 49.343 .5559 .5359 .5321

7,055

26

46.426 46.426 46.400 .5230 .5043 .5004

7,818

22

42.670 42.670 42.670 .4808 .4635 .4601

22,878

75

45.261 45.261 46.615 .5099 .4916 .5027

9,703

44

36.650 36.650 36.650 .4129 .3981 .3953

12,401

74

40.269 43.822 43.812 .4536 .4760 .4725

25,364

54

76.254 78.182 78.164 .8591 .8492 .8429

13,047

51

37.851 37.851 37.851 .4265 .4111 .4082

14,646

32

56.160 59.160 56.202 .6327 .6426 .6061

77,042

278

49.165 49.154 49.565 .5539 .5339 .5345

9,133

45

32.425 32.425 32.425 .3653 .3522 .3497

6,895

lR

53.884 53.884 53.884 .6070 .5853 .5811

21,330

42

76.385 76.245 76.245 .8606 .8282 .8222

5,952

14

62.056 71.938 71.938 .6991 .7814 .7758

26,509

40

88.128 106.410 106.275 .9929 1.1558 1.1461

29,224

31

93.092 93.092 93.092 1.0487 1.0112 1.0039

9,345

46

51.249 52.088 52.088 .5774 .5658 .5618

10,576

37

53.950 53.950 53.950 .6078 .5860 .5818

6,338

9

72.903 71.967 72.405 .8213 .7817 .7808

8,991

39

27.050 27.050 36.853 .3048 .2938 .3974

34,272

70

74.548 74.544 74.544 .8398 .8097 .8039

9,421

56

15.853 15.919 15.919 .1786 .1729 .1717

4,381

6

43.950 43.950 43.950 .4952 .4774 .4740

105,431

285

61.393 61.387 61.387 .6916 .6668 .6620

8,894

41

42.482 42.480 42.480 .47871 .4614 .4581

ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE

County

Eng. Cong. Com. Asrqe.a

Div. Dist. Dist. Miles

- -- -

Chattooga _______________ 3

7

3

328

Cherokee ________________ 3

9

3

4 29

Clarke ___________________ 3

8

3

l 14

Clay _____________________ 1

3

1

203

Clayton__________________ 3

6

3

142

CColibnbch_______________________________-_-_-_-

1 3

11 7

1 3

747 353

Coffee ___________________ 1 11

1

632

Colquitt_ _______________ 1

2

1

5 29

C C

ooolukm__b_i_a________-_-_-_-_-_-_-_-_-_-_-_-

2 1

10 11

2 1

3 50 2 41

Coweta __________________ 2

4

2

4 43

Crawford ________________ 1, 2

6

2

3 19

Crisp ________ Dade ________ Dawson______

-----------
-----------
-----------

1 3 3

3 7 9

1
3 3

2 77 186 2 16

DDeeKcaatlubr_______-_-_-_-_-_-_-_-_-_-_-_-_-_-

1 3

2 5

1 3

5 83 2 72

Dodge ___________________ 2 12

2

4 31

Dooly ___________ ________ I 2

3

2

3 97

Dougherty_______________ i 1

2

1

342

Douglas _________________ 3

5

3

2 08

Early ____________________ 1

2

1 ' 524

Echols ___________________ 1 11

1

3 62

Effingham ______________ 2

1

2

4 48

Elbert ___________________ 3

8

3

3 61

Pop. 1930 Census

Pop .Per

Per- Per- Per-

Sq. Mile

cent- cent- cent-

1930 Mileage Mileage Mileage age age age

Census 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36

15,407

47

20,003

47

25,613

225

6,943

34

10,260

72

7,015

9

35,408

100

19,739

31

30,622

58

8,793

25

11,311

47

25,127

57

7,020

22

17,343 I 63

4,146

22

3,502

16

23,622

41

70,278

258

21,599

50

18,025

45

22,306 I 65

9,461

46

18,273

35

2,744

8

10,164

23

18,485

51

46.380

56.579

35.886

37.411

38.772

69.311

60.992

60.195

78.858

52.513

44.470

78.155

62.820

41.651

24.100

44.104

70.600

42.218

79.677

67.615

51.262

I

34.925 69.440

62.900

44.254

74.952

46.380
56.579 35.524 37.411
37.603 69.273 71.107
60.747 78.858
52.513 44.463
86.395 62.820 41.941 24.100
44.104 70.918
45.456 83.386 67.614
51.257 34.922
69.470 62.847 44.272
74.952

46.271 56.490 36.021
37.411 37.603
69.273 71.528 60.747
78.858 52.512
44.329 86.395 62.820
41.941 24.100
44.042 70.918
46.506 83.386 67.614
51.257 34.922
69.470 62.847 44.290
75.080

.5225 .6374 .4043
.4215
.4368 .7808
.6872
.6781 .8884 .5917
.5010 .8805
.7077 .4692
.2715 .4969
.7954 .4756 .8977
.7617 .5776
.3934 .7823 .7087
.4985 .8445

.5037 .6146
.3859 .4063
.4085 .7524 .7724
.6598 .8566
.5704 .4829 .9384
.6824
.4555 .2618 .4791
.7703 .4937 .9058
.7344
.5567 .3793 .7546
.6827 .4809 .8141

.4990 .6092
.3885
.4034 .4055 .7471
.7714 .6551 .8504
.5663
.4780 .9317 .6775
.4523 .2599
.4750 .7648 .5015
.8992 .7292
.5528 .3766
.7492 .6777 .4777 .8096

ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE

County

Area Eng. Cong.l Com. Sq. Div. Dist.i Dist. Miles

EmanueL _______________ 2 12

2

764

Evans ____________________ 1

1

1

287

Fannin __________________ 3

9

3

401

Fayette__________________ 2

6

2

234

Floyd ____________________ 3 7 3 502

Forsyth__________________ 3

9

3

247

Franklin_________________ 3

8

3

279

Fulton_________________ . _ 3

5

3

541

Gilmer_ __________________ 3

9

3

440

Glascock ________________ 2 10

2

170

Glynn ___________________ 1 11

1

439

Gordon __________________ 3

7

3

375

Grady ___________________ 1

2

1

444

GGrweiennnee_t_t____-_-_-_-_-_-_-_-_-_-_-_-_-_-

3 3

8 9

3 3

416 440

Habersham______________ 3

9

3

290

HHaanlLco_c-k--_-_-_-_-_-_-__-_-_-_-_-_-_-_-_-_-

3 2

9 10

3 2

437 530

Haralson ________________ 3 7 3 284

Harris ___________________ 2

4

2

501

Hart _____________________ 3

8

3

261

Heard ___________________ 2

4

2

285

Henry ___________________ 3

6

3

324

Houston_________________ 2 12

2

443

Irwin ____________________ 1 11

1

378

Jackson _________________ 3

9

3

355

Pop. Per

Per- Per- Per-

Pop. Sq. Mile

cent- cent- cent-

1930

1930 MUoagoiMlloa..IMlloago age age age

Census Census 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36

24,101
7,102 12,969
8,665 48,667 10,624 15,902
335,220 7,344 4,388
19,4.00 16,846 19,200
12,616 27,853 12,748
30,313 13,070
13,263 11,140
15,174 9,102 15,924
11,280 12,199
21,609

32 116.232 120.291 120.291 1.3094 1.3066 1.2973

25

20.578 28.478 38.621 .2319 .3093 .4165

32

45.008 38.64.8 38.532 .5070 .4198 .4155

37

23.610 45.370 45.370 .2660 .4928 .4893

97 88.367 88.367 88.367 .9956 .9598 .9530

43

37.390 37.390 37.488 .4212 .4062 .4042

57

60.840 60.823 60.823 .6854 .6606 .6560

620

90.572 99.685 99.449 1.0204 1.0828 1.0724

17

58.409 58.409 58.415 .6581 .6344 .6300

26

30.875 30.875 30.875 .3478 .3354 .3330

44

53.792 54.135 54.135 .6060 .5880 .5838

45

56.245 56.287 56.287 .6337 .6114 .6070

43

73.527 73.913 73.913 .8283 .8028 .7971

30

60.300 60.300 58.808 .6794 .6550 .6342

63

94.020 107.005 107.880 1.0592 1.1623 1.1634

44

59.570 59.570 59.557 .6711 .6471 .6423

69

75.970 75.970 75.931 .8559 .8251 .8188

25

62.800 74.620 74.679 .7075 .8106 .8054

47

36.065 36.062 36.062 .4063 .3917 .3889

22

67.060 66.329 66.329 .7555 .7204 .7153

58

57.940 58.247 58.247 .6528 .6327 .6281

32

45.570 45.570 45.570 .5134 .4950 .4915

49

61.890 61.895 61.895 .6972 .6723 .6675

26

63.850 63.846 63.846 .7194 .6935 .6885

32

56.330 56.330 56.028 .6346 .6118 .6042

61

72.003 84.103 84.264 .8112 .9136 .9087

ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE

I

County

I I I Area
Eng.ICong.[ Com. Sq. Div. Dist. Dist. Miles

1

Jasper ______ .

--------

2

6

2

321

Jeff Davis __ _ ------ . - 1

11

1

300

Jefferson___ _ --------- 2 10

2

646

Jenkins _______ _ --------

2

1

2

342

Johnson ____ _ --------- 2 12

2

292

Jones Lama

______ . r _________

_------------------

2 2

6 6

2 2

377 184

Lanier _________ _--------- 1 11

1

191

""
Cl

Laurens _______ Lee ____________

__------------------

2 1

12 3

2 1

806 326

Liberty ________ L i n c o l n ________ Long___________

___---------------------------

1
3 1

1
10 1

1
3 1

543
291 393

Lowndes_______ Lumpkin ______ Macon_________

___---------------------------

1
3 2

11
9 3

1
3 2

483 280
332

M M

a a

diso rion

n _______ ________

__------------------

3 2

8 4

3 2

284 360

McDuffie ______ M c i n t o s h ______

__----------

-----

-

2 1

10 1

2 1

287 470

M e r i w e t h e r ____ Miller_ _________ Mitchell _______ Monroe ________

____--------------------------------

-
-
-

2 1
1 2

4 2 2 6

2 1 1
2

496
253 548 470

MMoorngtgano_m__e_r_y________--

------
-------

-
-

1 3

12 8

1 3

190 390

IPop. Per I

Per- Per- Per-

Pop. Sq. Mile

cent- cent- cent-

1930

1930 Mileage Mileage Mileage age age age

Census Census 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36

8,594 8,118 20,727
12,908 12,681
8,992 9,745
5,190 32,693 8,328 8,153
7,847 4,180
29,994 4,927 16,643 14,921
6,968 9,014
5,763 22,437
9,076 23,620 11,606 10,020
12,488

27 59.151 59.151 59.115 .6664 .6425 .6375

27

22.560 22.534 22.534 .2541 .2447 .2430

32 101.400 98.055 98.048 1.1424 1.0651 1.0574

38

56.412 56.412 56.346 .6356 .6127 .6077

43

58.575 58.733 58.733 .6599 .6380 .6333

24

63.809 63.809 63.747 .7188 .6931 .6875

53

48.071 48.106 48.106 .5416 .5225 .5188

27

40.820 41.205 39.584 .4599 .4476 .4269

41 113.369 137.069 137.069 1.2772 1.4888 1.4782

26

33.117 33.120 33.120 .3731 .3598 .3571

15 35.830 53.330 53.330 .4037 .5792 .5752

27

48.300 48.300 48.300 .5441 .5247 .5208

11

43.947 43.947 43.947 .4951 .4773 .4740

62

84.090 99.317 99.317 .9474 1.0788 1.0710

18 58.349 61.549 61.549 .6574 .6685 .6638

50

69.757 84.757 82.919 .7858 .9207 .8942

53

76.750 76.505 76.505 .8647 .8310 .8250

19

34.550 47.250 47.250 .3893 .5132 .5096

31

48.479 48.479 46.490 .5461 .5266 .5014

12

33.006 33.006 49.806 .3719 .3585 .5371

45

66.116 96.816 96.816 .7448 1.0516 1.0441

36

46.380 46.380 46.380 .5226 .5038 .5001

43

85.292 86.998 90.248 .9609 .9449 .9733

25

71.623 71.723 71.723 .8069 .7791 .7735

53

46.802 46.802 46.802 .5272 .5084 .5047

32

65.292 65.292 64.120 .7356 .7092 .6915

ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE

I

i

County

Eng. Cong. Com.

Div. Dist. Dist.

- -- -

ndurray __________________ 3

7

3

nduscogee___ . ____________ 2

4

2

Newton___________________ 3

8

3

Oconee ____________ ----

3

8

3

Oglethorpe. ____________ 3 8 3

Paulding________________ 3 I 7

3

Peach ______ .. _.. ________ 2 12

2

Pickens______ .. _. ________ Pierce ___________________

3 1

9 11

3 1

Pike _______ . __ .. _________ 2

6

2

PPPuoulltakns.akmi--_._-_-__-__-__-.__-_-._.-_-__-___-__-_-_--_--_--_--

3 2 2

7 12 8

3 2 2

Quitman ______ .. ________ 1 3 1

Rabun. __________________ 3

9

3

Randolph______________ .. 1 3 1

Richmond _______________ 2 10

2

Rockdale ________________ Schley ___________________

3 2

5 3

3 2

Screven__________________ 2

1

2

Seminole ________________ 1

2

1

Spalding_________________ 2

6

2

Stephens ________________ Stewart __________________

3 1

9 3

3 1

Sumter___________________ 1

3

1

Talbot. __________________ 2

4

2

Area Sq. Miles
342 235 262 172 504 324 179 231 345 237 317 258 361 144 377 412 319 119 154 794 240 209 166 411 456 312

Pop.Perj

Per- Per- Per-

Pop. Sq. Mile

cent- cent- cent-

1930

1930 Mileage Mileage Mileage age age age

Census Census 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36

9,215

27

51.616 51.616 51.616 .5815 .5606 .5566

57,558

245

64.792 64.558 64.628 .7300 .7012 .6970

17,290

66

67.782 67.782 67.699 .7636 .7363 .7301

8,082

47

50.760 50.598 49.266 .5719 .5496 .5313

12,927

26

58.500 58.500 57.341 .6590 .6354 .6183

12,327

38

54.377 54.377 54.377 .6127 .5906 .5864

10,268

57

30.090 30.090 30.813 .3390 .3269 .3323

9,687

42

55.080 55.080 54.677 .6205 .5983 .5897

12,522

36

42.111 42.091 42.091 .4744 .4571 .4539

10,853

46

38.942 38.942 38.942 .4387 .4230 .4200

25,141

79

57.496 57.496 57.496 .6478 .6246 .6200

9,005

35

55.236 55.136 55.136 .6223 .5988 .5946

8,367

23

58.790 58.790 58.289 .6623 .6386 .6286

3,820

27

36.660 36.660 36.660 .4130 .3982 .3954

6,331

17

58.559 58.559 58.518 .6598 .6361 .6310

17,174

42

40.174 40.174 40.174 .4526 .4363 .4333

72,990

229

68.835 68.835 68.985 .7755 .7477 .7439

7,247

61

26.385 26.385 26.385 .2972 .2866 .2846

5,347

35

28.803 28.803 28.803 .3245 .3129 .3106

20,503

26

74.803 74.803 74.803 .8427 .8125 .8067

7,389

31

25.500 25.487 25.487 .2873 .2768 .2748

23,495

112

40.382 48.?64 48.264 .4550 .5243 .5205

11,740

71

32.548 32.548 32.548 .3667 .3535 .3510

11,114

27

67.300 67.300 66.974 .7582 .7310 .7223

26,800

59

75.718 75.718 76.493 .8530 .8225 .8249

8,458

27

67.446 67.446 67.081 .7599 .7326 .7234

ALPHABETICAL LIST OF COUNTIES SHOWING ENGINEERING DIVISIONS, CONGRESSIONAL DISTRICTS, COMMISSIONERS DISTRICTS, AREA, POPULATION, STATE MILEAGE AND PERCENTAGE

i

I

1

[

IPop. Per 1

Area Pop. , Sq. Mile ,

I

Per- Per- Per-

cent- cent- cent-

County

Eng. Ieong. Com.[ s.q. I 1930

1930 Mileage Mileage,Mileage age age age

Div. 1 Dist. Dist. M1les Census Census 1 6-30-34 6-30-35 6-30-36 6-30-34 6-30-35 6-30-36

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - . - - - - - 1~-- - - - - - - - - - - - - -.-~.. ~---

Taliaferro_______________ 3 10

3

212

6,172

29 124.986 34.286 34.286 .2814 .3724 .3698

TattnalL ________________ 1

1

1

466 15,411

33

68.860 79.302 79.302 .7758 .8613 .8552

Taylor___________________ 2

3

2

340 10,617

Telfair..__________________ 1 12

1

373 14,997

31

67.760 71.060 71.342 .7634 .7719 .7694

1

40 \70.632 70.337 91.537 .7958 .7640 .9871

TerrelL_________________ 1

3

1

322 18,290

52

54.068 55.454 55.405 .6091 .6023 .5975

Thomas________________ 1

2

1

530 32,612

62 190.826 91.169 91.169 1.0232 .9903 .9832

Tift______________________ 1

2

1

243 16,068

66 I 56.690 57.147 57.147 .6387 .6207 .6163

Toombs_ ________________ 1 12

1

393 17,165

44

60.141 60.141 67.139 .6776 .6533 .7240

Towns ___________________ 3

9

3

181

4,346

24

38.330 38.330 38.330 .4318 .4163 .4134

Treutlen_________________ 2 12

2

262

7,488

29

27.900 27.900 27.900 .3143 .3031 .3009

Troup ___________________ 2

4

2

435 36,752

85

77.900 80.378 80.378 .8776 .8730 .8668

~ Turner__________ _______ 1

3

1

231 11,196

49

34.218 34.206 34.206 .3855 .3716 . 3689

Twiggs____________ ____ 2 12

2

314

8,372

27

51.398 55.348 55.112 .5791 .6012 .5943

Union___________________ 3

9

3

324

6,340

20

44.160 44.160 44.191 .49751 .4796 .4766

Upson__________ _______ 2

6

2

317 19,509

62

63.100 63.100 63.100 .7109 .6854 .6804

Walker___________________ 3

7

3

432 26,206

61

56.563 56.563 56.462 .6372 , .6144 .6089

Walton_________________ 3

8

3

331 21,118

64

72.916 72.916 73.930 .8215 .7920 .7973

Ware_____________________ 1 11

1

771 26,558

34

81.254 81.254 81.254 .9154 .8826 .8763

Warren__________________ 2 10

2

404 11,181

28

46.510 46.510 46.495 .5240 .5052 .5014

Washington_______ _____ 2 10

2

669 25,030

37

91.996 91.996 91.091 1.0364 .9993 .9823

Wayne______________

1 11

1

615 12,647

21

75.459 75.459 75.503 .8502 .8196 .8143

Webster_________________ 1

3

1

302

5,032

Wheeler_________________ 1 White___ ________ _ _____ 3

I 12

1

9

3

264 245

9,149 6, 056

17 35

I 24.110 31.110 39.606 . 2716 . 3379 .4271
46 339 58.389 58.389 .5220 .6342 .6297

25

44. 900 53. 150 53 .127 .5059 .5773 .5729

Whitfield_ __

_ ____ 3

7

3

283 20,808

74

47.109 47.617 47.617 .5307 .5173 .5135

Wilcox_____________ _____ 1 12

1

403 13,439

33

44.290 44.290 44.290 .4990 .4810 .4777

Wilkes_ -----------------~ 3 Wilkinson____________ 2

I 8

3 I 458

10

2

472

15,944 10,844

35

59 347 59.347 59.807 .66861 .6447 .6449

23

58.999 70.349 70.347 .6647 .7641 .7587

Worth_____ _________1_ _z_ _1_l_6~_ ____::.o94_ _ _~_ 63.870 64.175 64.175 __2196 .6971)~921

TOTALs __________ _I

1

I

I

I 158,725 2,908,506

49.5 18,876.218:9,206.429,'9,272.80710o.oooo/wo.oooowo.oooo

DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1934, JUNE 30, 1935, AND JUNE 30, 1936

County

' Total-Year Total-Year I Total-Year

Ending 6-3Q-34 Ending 6-30-35 Ending 6-30-36

----------------I

1

Appling ___ -----_-_-__ $ 15,763.75 $ 16,777.49 $ 17,743.93

Atkinson------_-----

12,429.33

13,169.40

14,033.35

Bacon- --------------

9,954.99

12,390.88

13,201.70

Baker----------------

10,748.42

11,388.42

12,135.51

Baldwin_------------

11,401.09

12,079.95

13,256.03

Banks---------------

9,232.01

9, 781.71

10,423.42

Barrow - - --------- ---

10,143.60

11,695.88

12,462.37

Bartow--------------

19,208.11

20,737.78

22,232.77

Ben HilL------------

9,534.53

10,102.25

10,764.98

Berrien ___ -_--- __ ----

14,146.50

15,789.53

16,214.39

Bibb_----------------

12,384.48

13,120.47

14,042.28

Bleckley _________ - ---

8,167.75

8,654.08

9,221.79

Brantley-------------

12,884.17

14,381.38

15,324.82

Brooks___ -----------Bryan ____________ --Bulloch_____________ _

19,163.55 15,631.70
21 '749 .42

20,358.78 19,202.35 28,741.75

21,684.39
20,459.46 30,244.74

Burke_-------------Butts _____________ --Calhoun____________ _ Camden ____________ _

23,449.54 10,248.46 13,589.81 18,364.01

24,845.82 13,812.51 14,399.00
19,270.09

26,475.74 14,814.04 15,343.58 20,528.32

Candler_ ____________ _

6,813.80

7,219.53

10,480.52

CarrolL ____________ _ Catoosa ____________ _

18,778.37 3,993.31

19,895.45 4,244.30

21,200.61 4,527.43

Charlton ___________ _ 11,049.69

11,730.05

12,499.56

Chatham___________ _ 14,884.12

16,384.72

17,458.70

Chattahoochee_____ _ 10,701.05

11,337.85

12,081.49

Chattooga__________ _ 11,682.97

12,378.60

13,175.56

Cherokee ___________ _ Clarke ______________ _ Clay ________________ _

14,252.05 9,039.56
9,423.69

15,100.66
9,636.99 9,984.81

16,198.74 10,224.80
10,639.84

Clayton_____________ _ Clinch ______________ _ Cobb _______________ _

9,766.53 17,459.19
14,633.06

10,272.07
18,491.17 18,978.12

10,694.44
19,701.53 20,351.34

Coffee ______________ _ 15,094.04

16,138.25

17,276.70

Colquitt_ __________ _ 19,679.51

21,046.82

22,427.54

Colurnbia___________ _ Cook________________ _ Coweta _____________ _ Crawford ___________ _

13,227.84 11,201.83 19,686.96 15,824.13

14,015.47 11,867.92
21,347.64 16,766.35

14,934.70 12,634.94
24,571.10 17,866.26

Crisp __________ -----Dade________________ _

10,491.74 6,070.70

11' 154.54 6,432.18

11,928.18 6,854.13

Dawson _____________ _ Decatur ____________ _ DeKalb _____________ _ Dodge ______________ _ Dooly _______________ _

11,109.64
17,783.89 10,634.55
17,530.47 17,031.97

11 '771.16 18,906.47 11,489.59 21,663.92 18,046.00

12,535.42
20,169.36 13,146.24 23,715.31
19,229.70

Dougherty__________ _ 12,756.30

13,680.58

14,577.69

Douglas ____________ _ Early _______________ _
Echols ______________ _ Effingham _________ _ Elbert ______________ _

8,018.67 17,491.68 15,844.28
10,508.72 18,880.13

9,320.52
18,539.21 16,780.75
11,813.56 20,004.33

9,931.97 19,757.55 17,873.94
12,592.55 21,326.71

EmanueL ___________ _ Evans _______________ _

29,278.43 5,183.53

31,299.81 7,614.20

34,211.24 10,992.29

29

DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1934, JUNE 30, 1935,
AND JUNE 30, 1936

County

I Total-Year I Total-Year Total-Year Ending 6-3o-34 Ending 6-3o-35 Ending 6-30-36

Fannin ______________ $ Fayette______________ Floyd ________________ F o r s y t h ______________ Franklin _____________ Fulton _______________ Gilmer _______________
Glascock ____________ Glynn _______________ Gordon ______________ Grady _______________ Greene ______________ Gwinnett ____________ H a b e r s h a m __________ HalL ________________
Hancock _____________ Haralson ____________ Harris _______________ IIart _________________ Heard _______________
IIenry _______________ Houston_____________ Irwin ________________
Jackson _____________ Jasper _______________
Jeff Davis ___________ J e f f e r s o n ____________ Jenkins ______________ Johnson _____________ Jones ________________ Lamar _______________ Lanier _______________ Laurens _____________ Lee __________________
Liberty ______________ Lincoln ______________ Long_________________
Lowndes _____________ Lumpkin ____________ Macon _______________ Madison _____________ Marion ______________ McDuffie ____________ Mcintosh ____________ M e r i w e t h e r __________ Miller_ _______________
Mitchell _____________ Monroe ______________
Montgomery ________ M o r g a n ______________
Murray ______________
Muscogee ____________ N e w t o n ______________ Oconee ______________

11,337.35 5,947.27 22,259.32 9,418.39 15,325.39 22,033.32 14,713.01 6,852.79 13,550.01 14,167.91 18,521.18 15,189.35 23,683.30 15,005.46 19,136.57 15,819.10 9,084.64 15,095.29 14,594.88 11,478.91 13,980.09 16,083.58 14,189.34 18,137.30 14,899.92 5,682.78 25,542.29 14,209.98 14,785.20 16,073.25 11,209.52 10,282.41 28,644.68 8,009.68 8,818.65 11,016.07 11,305.92
21' 181.97 14,697.91 17,571.54 19,333.04 8,703.02
11' 196.91 8,314.09 16,654.38 11,682.96 21,627.01 18,041.59 11,901.13 16,446.82 13,001.88 16,320.86 13,511.94 12,786.25
30

$ 11,576.77 9,976.27 23,584.74 9,979.22 16,233.36
26,252.63 15,589.09 8,240.38 14,425.49
15,019.94 19,701.27 16,093.79
28,559.14 15,898.95 20,276.04 18,313.02
9,624.79 17,847.93
15,545.85 12,162.42 16,520.95 17,040.72
15,034.22 22,446.69 15,787.12
6,019.39 26,376.91 15,056.10
15,644.22 17,030.32 12,832.82
10,995.09 33,369.52
8,839.70 14,233.52 12,891.04
11 '729 .25 26,264.44 16,427.14
20,587.36 20,418.82 10,888.78
12,938.82 8,809.15 19,748.98
12,378.60 23,219.35
19,128.98 12,491.24 17,426.12
13,776.06 17,245.86
18,090.71 13,504.36

$ 10,975.57 12,903.39 25,131.92 10,647.41
17,298.29 28,317.21
16,612.59 8, 780.97 15,396.20 16,008.24
21,021.16 16,834.58
30,615.70 16,939.21 21,602.84
21,226.85 10,256.18 18,864.24
16,565.67 12,960.30 17,603.19
18,158.05
15,996.77 23,931.87 16,819.96 6,408.75
27,885.25 16,034.66 16,703.90
18,129.90 13,681.54
11,376.66 38,982.97 9,419.45
15,167.27 13,736.72 12,498.70
28,246.15 17,505.51 23,850.85
21,758.34 13,438.09 13,367.71
10,706.25
27,534.85 13,190.65 25,666.89
20,398.30 13,310.67 18,471.09
14,679.80 18,370.25
19,253.86 14,011.45

DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1934, JUNE 30, 1935, AND JUNE 30, 1936

County

Total-Year I Total-Year Total-Year Ending 6-3Q-34 Ending 6-3o-35 Ending 6-3Q-36

Oglethorpe__________ $ Paulding ___________ _ Peach_______________ _
Pickens _____________ -~' Pierce ______________ _ Pike ________________ _ Polk ________________ _
Pulaski _____________ _ Putnam ____________ _ Quitman ___________ _ Rabun______________ _ Randolph_________ _
Richmond _________ _ Rockdale ___________ _ Schley ______________ _ Screven_____________ _
Seminole ___________ _ Spalding___________ _ Stephens ___________ _ Stevvart ____________ _ Sumter ___________ _ Talbot _____________ _
Taliaferro __________ _ Tattnall ____________ _
Taylor ______________ _ Telfair ______________ _ TerrelL _____________ _ Thomas ____________ _ Tift _________________ _
Toombs _____________ _ Tovvns ______________ _ Treutlen____________ _ Troup ______________ _ Turner _____________ _ Tvviggs______________ _ Union ______________ _ Upson ______________ _
Walker_ _____________ _ Walton _____________ _ Ware_______________ _ Warren _____________ _
Washington ________ _ Wayne ______________ _ Webster ____________ _ Wheeler ____________ _
White _______________ _ Whitfield ___________ _ Wilcox ______________ _ Wilkes ______________ _
Wilkinson __________ _ Worth ______________ _

14,735.93 13,697.37 7,579.58 13,874.46
8,145.33 9,809.36 14,567.05
13,913.75 14,808.98 9,234 53 14,750.81
10,119.67 17,339.29 5,722.00
7,247.26 18,842.61
6,423.35 10,172.09 8,198.72 16,952.64 19,073.09
16,989.40 6,293.88
17,345.59 17,247.74 15,885.18 12,843.97
20,580.28 14,280.01
15,211.36 9,655.18 7,027.91
18,588.56 8,619.39 12,946.97 11,123.74
15,872.78 12,817.86
18,367.28 20,087.97 11,036.47
23,173.47 18,972.37 6,073.22
11,672.62 11,310.15
11,866.58
11' 156.49 14,949.30 14,870.12
16,088.62

$ 15,613.36 14,51?.96
8,030.86 14,700.58 11,233.89
10,393.43 15,345.41 14,735.37
15,690.76 9,784.38 15,629.13 10,722.26
18,371.75 7,042.03
7,687.39 19,964.57 6,803.22 12,974.28
8,686.90 17,962.06 20,208.78 18,001.03
7,889.77 20,956.24 18,518.13
18,831.14 14,707.94
24,307.84 15,190.30 16,051.35
10,230.11 7,446.37 20,992.23
9,131.04 14,508.59 11,786.09
16,841.09 15,096.40 19,460.93
21,686.30 12,413.31
24,553.30 20,139.65
7,353.96 13,949.87 14,185.49
12,674.86 11,820.80 15,839.43
18,018.60 17,107.65

$ 16,392.96
15,465.04 8,687.96 15,606.49 11,970.85 11,075.27
16,352.08 15,680.90 16,577.62
10,426.25 16,645.77 11,425.65
19,574.52 7,504.00 8,191.70
21,274.28
7,248.60 13,726.46 9,256.78
19,114.79 21,641.77 19,131.40
9, 751.08 22,553.80 20,248.79
22,836.50 15,767.50 25,928.83 16,252.83
18,868.55 10,901.32 7,934.88
22,859.82 9,728.32
15,708.53 12,565.82 17,945.89
16,072.76 20,817.43 23,108.95
13,224.45 25,906.64
21,466.93 10,694.99 16,606.06 15,111.21
13,542.46 12,596.24
16,975.62 20,007.24 18,251.61

TOTALS ___________ $2,201,"281.35--~ ~1,929.73- $2,"63(\856.72-

31

Pi\RT TWO
FISCAL YEAR ENDING JUNE 30, 1935

STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES
JUNE 30, 1935 ASSETS

Exhibit "A"

Current Assets Cash in Banks State Funds __ -----------National Recovery Trust Fund __ _

_____ $

294.3:H 15 3\18,888.51

(;93,219 66

State Tre.:'lsurer, Highway Fund~-_ L. S. Government, Vouchers in Tran,;it
Federal Aid ___________________ _
National Recovery _____ _

:l.\lll6 .05 3\17.804.11

6,0lHl,mHl.l2 401.770 22

Accounts Receivable________________ _ Advances __________________ ------ _______ _

100,'1:36.05 1.545.00

7 ,2G3 ,570.05

Deferred Charges Inventory of Supplies and Materials _______ _ Shop Jobs in Progress ____________________ _ Undi:3tributcd Payrolls ___________________ _
Undistributed Charges _______ ---------- __ _

122,139 41 14,886.15 48,321.32 27.883 15

213.830 03

Total Proprietary Assets _______________ _

$ 7,4i7,400.08

Capital Investments Land, Buildings and Equipment (Schedule Xo. 4) Land ____________________ ------------ __ $ Buildings _____________________________ _ Trucks _______________________________ _
Tractors----- ______ -- _________________ _ Other Road Equipment _________________ _
Engineering Equipment ________________ _ Office Equipment ______________________ _
Shop Equipment_---------------------Laboratory Equipment_ ________________ _ Quarry Equipment ________________ _

178,295.25 315,229.00 268,445.00 133,7GO.OO 321,139.00
36,421.00 39,513 70 47,599.00 14,953.00 52,753.00

$ 1,408,118.55

Roads and Bridges Construction Cost to Date On Closed Projects _________ --------- $132,346,516.54 On Open Projects--------------------- 11,408,182.49
W. & A. Rental Warrants ________________ _

143,754,099.03 1,620,000.00

Total Capital InYc,tments ______________________________________________ $146,782,817.58

TotaL_. ___________ ------------------ .... ------- ____ -..... $154,260,217.66
34

Exhibit "A." STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES
JUNE 30, 1935 LIABILITIES, FUND BALANCES AND SURPLUS

Current Liabilities Accounts Payable __________ --------U. S. Government, Advance National Recovery Fund---------------------------
Total Proprietary Liabilities ____ _
Fund Balances (Schedule No. 6) Construction Contract Liabilities Contracts, State ___ --------------Contracts, National Hecovery ___________ _ Contracts, Other FederaL __ - _____ _____ _

none 600,000.00

600,000.00

2,390,5Y8.65 3,8tn,o:Jo.23
43,644.66

Totals----------------------------Less: Participation Receivables
Federal Aid ____________ --------------
National Recovery-------------------_ Other Funds, Net ___________________ _

23 '653 09 3,520,347.71
20,11128

6,32.5,273 54 3,564,112.08

Net Liabilities, State Funds _________ _
Unencumbered Allotment Balances Construction, State Forces ______________ _
Survey Projects ___ ----------------- ___ _ Reconstruction Projects _____ ------- ____ _ Maintenance, GeneraL _______ ------- ___ _ Convict Farm _______ --- __ ---_------- __

$ 2,/Ul,HH 4G

729 '400. 99 56,303 2~ 10, i4i 75 46, 132.49 65.317 '73

907, U02. 23

Unliquidated Purchase Orders------------

158,858.15

Total Fund Balances.-----------
Capital Liabilities and Surplus Capital Liabilities Refunding Certificates-Due to Counties -1936 thru 1945 ____________________ _
Surplus Invested in Plant and Equipment __ _ Surplus Invested in Highways _____________ _ Surplus Invested in W. & A. Warrants_

$ 3,82792184
$ 26,574,773.34 1,408,118.55
117,179,925.69 1,620,000.00

Total Capital Liabilities and Surplus ________ _

$146,782,817.58

Current Fund Surplus-Exhibit "B" Available Surplus, State Funds_____________ Surplus Reserves For County Construction ContractsDetail Estimates Incomplete ___________ $
For Revolving Fund (Doubtful Assets and Deferred Charges)____________________
For Redemption of Refunding Certificates-March 1936___________________

61,243.96 336,422.09 1,331,864.10

$ 1,319,948.09 1,729,530.15

Total Available Surplus and Reserves _______ -------------------------___ $ 3,049,478. 24

TotaL------------------------ ____ -------------- __________ ------------ $154,260,217.66

Note-current surplus, as above, does not include un>llotted Federal Funds amounting to $2,751,781.21

35

STATE HIGHWAY BOARD OF GEORGIA

Exhibit "B"

RECONCILIATION OF FUND SURPLUS

REFLECTING FUND REVENUE, ALLOTMENTS AND RESERVES

JULY 1, 1934 TO JUNE 30, 1935 Fund Surplus, July 1, 1934
Available Surplus, State Funds----------------Surplus Reserves _____ ------------------------

953,360.90 379,042.60 $ 1,332,403.50

FUND REVENUE

Revenue Received (Schedule No. 7) Motor Vehicle_______________________________ $ 1,206,051.30

Gasoline Taxes ______________ -----------______ 9, 655,076.41

Miscellaneous Income _______ ----------------__

22,757.91

$10,883,885.62

Estimated Participation Accruals (Schedule No. 7)
Federal Aid Allotments_---------------------National Recovery Allotments ________________ _ National Forestry Allotment __________________ _
Other Construction Participation______________ _

151,114.48 5,729,78109
39,777.78 18,900.40

5. 939,573.75

Total Fund Revenue ____________________________________ ------------------ $ 16,823,459.37

Available for Allotments ___ ----------------------------------------------- $ 18,155,862.87

FUND-ALLOTMENTS

Continuing Allotments (Schedule No. 6) Construction Projects Contractors, State Aid ______________________ _ Counties, State Aid_________________________ _
Contractors, Nat'l Recovery __________________ _ Contractors, Other Federal_ _________________ _ State Forces & Materials____________________ _

1,359,113.04 1,852,735.77 6,381, 748.46
57,617.43 1,649,699.43 $ 11,300,914.13

Survey Projects _______________________________ - _____________ _ Reconstruction Projects ______________________________________ _ Maintenance General__~------------ ________________ ----------

257,833.11 21,652.52
1,167,190.71

Total Continuing Allotments._------------------

$ 12,747,590.47

Non-Continuing Allotments (Schedule No. 6) Administration ______________________________ _ Research ___________________________________ .
Collection of Revenue _______________________ _ Quarry--- __________________________________ _
Equipment _______________________________ ---

Shop, Net ___ ------------------------- ______ _ Legislative Transfers
Motor Vehicle Tags ________________________ $
Transfer to Gen'l Fund-1935 Act. _________ _

60,059.69 2,000,000.00

2,060,059.69

------~~~-
Total Non-Continuing Allotments _____ ------------------- __ $ 2,358, 794.16

241,774.41 298.39
39.020.14 1,187.10 16,343.68
110.75

Total Fund Allotments---------------------------------------------------- $ 15 ,10fi,384. 63

Fund Surplus, June 30, 1935-Exhibit "A" Available Surplus, State Funds _______________ _

1,319,948.09

Surplus Reserves for:

County Contracts, Detail Estimates Incomplete Doubtful Assets and Deferred Charges _______ _

61,243.96 336,422.09

Redemption Refunding Certifieates-1936____ _

1,331,864.10 $ 3,049,478.24

36

THE HIGHWAY DOLLAR

r~rq/rvn~ ..;16.,7.5%

c;;;,..-/.-;,.C" 70~ .56.32'%

INCOME
L'<Tnc:/ CJo/M/?p.s ~ .C~v-;PA?~n/./Z%
.Ad,-n;n/$7"'r<T hen /.~.5/t
Co.os/rvc?"'/on 76-M')t
EXPENDITURES JULY I 1934 TO JUNE30 1935

STATE HIGHWAY BOARD OF GEORGIA

Exhibit "C"

STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES

JULY 1, 1934 TO JUNE 30, 1935

Revenue Receipts

State Treasurer Motor Yehiclc License Tax _______________ _ Fuel Oil Tax_ _________________ _
U. S, Government Reimbursements for Construction
Railroads, Counties and Cities Cash for Construction _________ _
Miscellaneous Income ____________ _

$ 1,206,051.30 0,655,076.41 $10,861,127.71
6,232,390.34
28,446.52 22,757.91

Total Revenue Hcceipts ___ _

$17' 144 '722 .48

Administration (Schedule No. 8-A) General Administration General Office ____________ _
Division Offices \V~archouse ____ _

EXPENDITURES

----- $

197,599.85 28,760.34 13,348.89

Research' ___________________ _ Collection of Revenue __________ _ QuarrY--------------------------------

239' 709.08
175.39 39,020.14
I, 157.10

280,061.71

Construction (Schedule No. 8-B) Surveys Actual Surveys ___________________ _
Plans __________________ -----------

!51 ,592. !l6 88,338.32

230,930.98

Construction
Supervision ____ ------------Actual Construction __________ _

444,001.33 10,936,059.00 $11,380,060.33 $11,619,991.31

Maintenance (Schedule No. 8-C) General
Supervision.-------------Actual Maintenance _________ _

62 '910. 83 1,098,943.18 $ 1,161,854.01

Reconstruction Supervision ________________________ _
Actual Reconstruction ___ ------- ___________ _

16.72 14,202.49

14,219.21 $ 1,176,073.22

Land, Buildings & Equipment (Schedule No. 8-D) Administration Equipment_ Construction Equipment_ Maintenance Land ______ _
Equipment_

150.00 1,964.27

2,280.12 14,300.62
2,114.27

18,695.01

38

STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES
JULY 1, 1934 TO JUNE 30, 1935 EXPENDITURES-Cont'd.

Exhibit ''C" Cont'd.

Legislative Transfers (Schedule No. 8-E) Motor Vehicle License Tags ______________ _
Transfer to General Fund-1935 Act ______ _ Prison Farm Purchase ________________________ _
Total Expenditures _________________________ _

60,059.69 2,000,000.00
546.93 -------------------

$ 2,060,606.62 $15' 155,427.87

Excess Revenue Receipts over Expenditures ________ _
Add Excess Proprietary Assets over Liabilities July 1, 1934_ ____________________________________ _
Excess Proprietary Assets over Liabilities June 30, 1935-Exhibit "A"-------------------------

$ 1, 989' 294.61
$ 4,888,105.47 $ 6,877,400.08

RECONCILIATION
Excess Proprietary Assets over Liabilities (as above). Available for Liquidation of Fund Balances and Surplus Reserve.:; _________________ _
Fund Balances (Contracts-Allotments-Purchase Orders, Etc.) ________________________ _
Current Fund Surplus ____________________ _ Surplus Reserves (Refunding Certificates, Doubt-
ful Assets, Deferred Charges, tTnrecorded Contracts) ___________________________________ _ Available Surplus, State Funds, June 30, 1935Exhibit "A"-------------------------------

$ 6,877,400.08 3,827,921.84
$ 3,049,478.24
$ 1'729 '530. 15 $ 1,319,948.09

39

STATE HIGHWAY BOARD OF GEORGIA LAND, BUILDINGS AND EQUIPMENT June 30,1935.

Schedule No.4.

Description

Appraised Value
July 1,1934

Additions for Fiscal Year
1934-35

Total June 30,1935

Depreciation for Fiscal Yr.
1934-35

Appraised Value
June 30,1935

Land ______________________ ---Buildings _____________________ _
Automobiles __________________ _ Trucks _______________________ _
Tractors ______________________ _ ..,.. Other Road Equipt. __________ _
.... Engineering Equipt. __________ _ Office Equipt. ________________ _ Shop Equipment_ ___________ _
Laboratory Equipment_______ _ Quarry Equipment ___________ _

$ 178,145.25 315,229.00
327,640.00 163,775.00 364,432.00 38,153.00 41,575.00 53,183.00 16,500.00 58,293.00

$

150.00

------------------

5,066.80
--- - -------------
9,070.03 2,040.12 1,775.77
592.29
---- ------------------------------

$ 178,295.25 315,229.00
332,706.80 163,775.00 373,502.03 40,193.12 43,350.77 53,775.29 16,500.00 58,293.00

-- ---------------------------------
$ 64,261.80 30,015.00 52,362.43 3,772.12 3,837.07 6,176.29 1,547.00 5,530.00

$ 178,295.25 315,229.00
268,445.00 133,760.00 321,139.60 36,421.00 39,513.70 47,599.00 14,953.00 52,763.00

TOTALS __________________ _

I"A"_________ .. __ __... _____ ___ ______ ____ _ $1,556,925.25

$ 18,695.01- I[--$1-,575,62_0_.2B_II $ 167,501.71--.

Total Appraised Value,June 30, 1935-Exhibit

=$=1=,4=0=8,=1=18=,=5=5=

Schedule No.5 STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1935

County

:1
. Amount II

County

I
I Amount

Elbert~~~-$- Appling ___- -__- __ :-$- 243,720=-t

166,551.32

Atkinson___ Bacon____

Baker________

Baldwin___

Banks ________ 1

Barrow_____

1

Bartow____ __-I

BenHilL ___ --1

Bibb__

-1

Bleck1ey____

Brantley____

Brooks_______

Bryan__________

Bulloch________

Burke__________

Butts_______ __

Calhoun_______

Camden____

Campbell______ _

Candler_______

Carroll______

Catoosa_________

Charlton___ ____

Chatham____

Chattahoochee__

Chattooga___

Cherokee____

Clarke

Clay___

Clayton___

Clinch__

Cobb

Coffee

Colquitt___

Columbia___

Cook_______

Coweta______

Crawford______

Crisp______

Dade______

Dawson____

Decatur____

DeKalb _____

Dodge_________

Dooly______

Dougherty__

Douglas

Early_______

Effingham__

12,314.60 EmanueL--------1. 26,272.90 Evans___________

24,969.42 11 Fannin __________ l 99,927.56 ' Fayette__________

75,191.59 Floyd_____



71,720.80 Forsyth__

124,299 .E4 Franklin_

61,400.58 Fulton____

835,846.57 Gilmer___

26,606.23 Glynn ______ ,

36,034.96 Gordon.___ __

359,320.51 Grady___

1

30,623.58 Greene____

123,758.98 Gwinnett___

243,630.66 Habersham___

82,818.10 HalL_________

9,977.75 Hancock_______

13,152.00 Haralson______

205,893.32 Harris_ ____ __

30,835.42 Hart_

523,814.89 Heard_____

23,142.85 Henry__________

81,348.22 Houston___

1,310,079.46 Irwin____________

17,875.97 Jackson________

124,788.11 Jasper________

199,509.72 Jeff Davis__

372,977.13 Jefferson____

47,141.09 Jenkins____

49,202.42 Johnson_________

62,153.55 Jones______

278,612.80 Lamar_______

75,961.09 Laurens_________

150,890.06 Lee______________

61,865.28 Liberty____

209,732.93 Lincoln______

487,277.97 Long________

31,709.18 Lowndes____

91,539.61 Lumpkin____

74,869.42 Macon______

25,713.39 Madison__

371,629.87 . Marion ________ .

259,849.79 McDuffie_________

64,102.49 Mcintosh_

192,022.91 Meriwether___

493,915.22 Miller___________

44,494.34 Milton___________

77,836.12 Mitchell________

57,391.06 Monroe__________

493,986.86 72,135.44
187,014.95 46,859.63 430,838.77 65,191.97 108,765.48 113,926.08 56,130.62 420,745.28 91,044.59 111,967.53 61,662.97 206,029.29 341,736.71 400,391.36 75,923.E5 149,659.86 106,678.62 125,506.39 19,131.75 219,591.56
291,391.43 56,545.31
127,589.35 91,658.61 33,398.63 350,905.53 85,086.68 35,649.49 42,877.44 19,499.10 284,243.00 81,509.77
31,332.06 32,830.45 38,174.64 547,277.10 84,092.05 193,593.06 20,359.40 22,817.86 53,649.81 15,277.50 405,913.92 35,395.83 20,713.10 417,193.11 119,384.92

42

Schedule No.6-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1936

-

- - - - - - - - - County

Amount

County

I Amount

-----~--~-~-

:Montgomery _____ $ :Morgan__________ :Murray__________ :Muscogee _______ Newton__________ oconee _____ - __ --
Qgletl:_J.Orpe_-- -- -~ Pauldmg_________ Peach______ -- __ -Pickens _____ --___ Pierce____________ Pike ______ --- ___ Polk ________ -____ PulaskL_________ Putnam ________ Rabun___________
Randolph________ Richmond_______ Rockdale________ Schley___________ Screven__________ Seminole_________
Spalding_________ Stephens________ Stewart__________ Sumter__________
Talbot___________ Taliaferro_______ Tattnall_________ Taylor________ ___

124,580.70 259,212.39 89,811.16 827,817.07
95,468.70 26,106.42
39,279.24 19,157.24 8, 194. 69 120,956.51 169,875.66 12,808.02 183,409.70 242,410.52 103,271.71 318,631.00
82,788.81 1,139,823.99
2,091.95 55,521.49 40,751.20 25,742.03
377,686.16 133,031.70 47,475.00 365,369.72
74,343.95 15,691.86 43,422.07 26,056.54

Telfair_ __________ $ TerrelL _________ _ Thomas _________ _ Tift _____________ _ Toombs________ _ Towns __________ _
Treutlen________ _ Troup __________ _ Turner _________ _ Twiggs __________ _ Union ___________ _ Upson __________ _ Walker_ _________ _ Walton _________ _ Ware____________ _ Warren _________ _
Washington ____ _ Wayne __________ _ Webster ________ _ Wheeler _________ _ White ___________ _ Whitfield _______ _
Wilcox __________ _ Wilkes __________ _ Wilkinson _______ _ Worth __________ _
Coastal Highway

74,387.83 271,526.03 391,611.67 177,857.97 205,582.07
45,084.25 2,000.00 631,255.57 24,384.28 22,555.36 50,680.00 121,586.46 187,076.07 161,859.52 634,572.73 22,603.85 106,474.51 272,659.54 13,740.18 133,062.67 35,472.82 265,529.38 10,093.64 268,753.94 36,060.67 245,023.78 882,898.87

TotaL ______ $ 26,574,773.34

43

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ALLOTMENTS AND FUND BALANCES; ALSO
REFLECTING RECONCILIATION WITH EXPENDITURES JULY 1,1934 TO JUNE 30, 1935

Schedule No. 6

Net

Estimated

Net

Estimated

Net

Description

IFund Balances Participation Fund Balances Allotments July 1. 1934 July 1, 1934 July 1, 1934

En cum.. brances

Expenditures

Total Charges

Fund Balances Participation Fund Balances June 30, 1935 June 30, 1935 June 30,1935

--------- ------------------ ----j-----1------- -------------- ----------------- --

Continuing Allotments~

Construction:

Contracts, State

Aid ___________ $2,282,135.01
Contracts, Nat'!. I

29,657.40 $2,311,792.41 $~.211,848.81

14.68 $3,133,027.89 $3,133,042 ..17 $2,390,598.65

20,111.28 $2,370,487.37

Recovery______ 418,287.76 3,821,818.99 4,240,106.75 6,381,748.46 6,622.61Cr 6, i:l/,447.59 6, 730,824.98 :l,8\l1,030.23 :J,520,:l47.71 370,682.52

Contracts, Federal

Aid..

733.13Dr. :33,898.80

33,165.67

57,617.43

47,138.44

47,138.44

43,644.66

23,65:3.09

19,991.57

Total Construc-

tion Contracts $2,699,689.64 $:3,885,375.19 $6,585,064.83 $9,651,214.70 $ fi,fi07.93Cr. $9,917,613.92 $9,911,00,1.99 $6,325.273.54 $3,564,112.08 $2,761,161.46

Stat~:' Forces a n d - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Materials ...... $ 567,280.06

. $ 567,280.06 $1,649,699.43 $ 25,132.09 $1,462,446.41 $1,487,578 ..\0 $ 729,400.99 _____________ $ 729,400.99

Total Construction ___________ $3,266,:969.70 $3,885,375.19 $7,152,344.89 w,:l00,914.13 $ 18,524.16 $11,:380,060.33 $11,398,584.49 $7,054.674.53 $3,564,112.08 $ 3,490,562.45

Surveys _________ $ 38,727.61

_ $ 38,727.61 S 257,833.11

:126.47 $ 239,930.98 !$ 240,257.45

56. 30:l. 27

--- $ 56,30:l.27

Reconstruction...

6,863.27

. .

6,863.27

21,652.52 3,548.8:3

14,219.21 . 17,768.04

10,747.75

10,747.75

Maintenance

I

(Sch.l-io.6-A)_ 18,311.68 .........

18,311.68 1,167,190.71 22,484.11Cr. 1,161,854.01 1,1:l9,:J6\l.90

46,132.49 ___________

46,132.49

I I Convict Farm... ___(),1'_86:.:_"6 .____::..:..::..::. -~~~64. 66_ _ _ _-~~~ ~~----- --~ ~3_ ___ 546_:113_ ______6ii-_:31'7.-':3_ ::..:..::..::.~~~- _ __li5_,:J.l'7,i'3 _

Total Continu-

I

I

ingAIIotments . .

= $:l= ,39=6,= 736-.= 92=1$i3=,8= 8.1-,3=75=.19=

$7,282,112.11 ,$12,747,5\10.47
======= =======

$ 84.{i5Cr.
=======

$12,79li,611.46
=======

$12,7\)6,526.81 $7,2:l:l,175.77
=====,====-------=-=

$:l,5fi4,112.08 ======

$:l,6fi9,06:l.fi9 --:-:::;=:=====

Description Non-,JW~~e~;.g

STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ALLOTMENTS AND FUND BALANCES; ALSO REFLECTING RECONCILIATION WITH EXPENDITURES JULY 1,1934 TO JUNE 30,1935

, Net-

Estimated

I!-Fund Balances Participation , Fund Balances I July 1, 1934 . July 1,1934 1 July 1,1934 I

-~- ----!~-----~---- ---~

II Expenditures
- ~-----

Total Charges
' ------~--

Estimated

Net-

Participation ' Fund Balances

1
June30, 1935, June30,1935

Administration

,

(Sch.:So.6-H) ____ :_ ------------

'

RCo/s~e~air~c:h~l:\:}~;~~~~'- __:

Quarry

!

(Sch.No.6-ll) ___ _]_______

Equipm'nt.

:

(~ch.:So.6-C)____

---1

~~~f~:}:l:~~~~~_r:~-:r _______ ::::~-----

241.774.41 $2,065.33
:39.:~::~: I1--:::~-0~----
1.187.10 I 30.00
16,34:l.68 2,351.33C'r.
60.:::::: 1110.75 --

:JU,020.

241,774.41
:HI.~~~:::
I, 187.10
16.343.68
60 :~:: ::

I:--.:-:~-~::~II::~~~~~-~~:-
-

TrF~~d'_1~~5 ~~~\------ :____ ______

2.000,0~0 00 ~----- _______ 2~0~,0~-~~~::-~:-:_:~::[:..~-:._:J:~~

tT~~i~~g a~:~~~~~~~~+-~:.::.:_:_--_-_-_--~-':_::..:::..:::..::::.::.::.:_:_:'=--=-===- _: 1~,:3~ i94:~!l_ 22~::.C~-~~~58,8J(j 4~~2~~~'i!J~'!~~ ::~~-- --~:-;,:_--.~:_:_ :.:ci.:..:_------:-----

1\et Fund Balanccs, - -- --_---- -~- . --- ---- - -~

1

July 1, 1934. ______ 1$3,396,136~~1

;

Estimated Participation,Ju1~\l:i4.:-l$3 ,885,375.19 I

Fund Balances,July I, 1U:34. ___ .. ____ ... ______ .. ______ !$7. 282, 112.11

I

Allotments for year-Exhibit "B" -------------

= - = = $15,10f>,384 63

~-~--~

I

EncumhranN'A for Year-Net Encumbrances_.

- -----r=~IJ6~0Cr.=;

I

Expenditun' for Year~ Exhibit "C" ____ _ Total Charges for Year ____________ _

-----_-___-_-__-_-_-_-_ ____'~~~~~~?-8~:~~~>;?!~LI I

Fund Balances, June 30, 1935 ______ .. F.atimated Participation, June 30, 1935 .. __ _

________________
__________ ____

_ _______ $7,233,175 77 I
_ ----1-~~:=~~----:~._s~~._r~ osl

Net Fund Balances, June 30, 1935... __ __ Add
Unliquidated Purchase Orders, etc __ _
Total Fund Balances, State Liability, June 30, 1935-Exhibit. "A" ____ __

------------------- -------

----------------1~-~58,858~_5__ -------------- ------------------- .$3,669,063.69 ----

. -----------------

-----------.---------- $3,827' 921.84
I=====
----

STATE HIGHWAY BOARD OF GEORGIA DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY
UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1935

Schedule No.6-A

Districts

!unencumbered Allotments
July 1, 1934
I

Allotments

Net

Expenditures

Encumbrances

SUMMARIZED BY DIVISION UNITS DIVISION NO. 1.

Unencumbered Total Charges Allotments
June 30, 1935

1-L ______________________ I$
:5; 1-2
1-3:::::::::::::::::::::::
1-11______________________ 1-12_ _____________________

1,857.75

1$

3,476.64

1 ,020. 720.R.

1,711.27

442 .900.R.

40,973.62
98,454.33 66,430.13 148,512.01 34,916.35

1$ 574.41or. $ 44,145.8o

620.120r.

95,754.19

596 .54Cr.

65,808.75

529.15

145.606.24

1,558.37

32,880.35

$ 43,571.39
95,134.07 65,212.21 146,135.39 34,438.72

i$ 740.o2o.R.
6,796.90
I 197.20
1 4,087.89 34.73

Totals _______________ $5~2M~ $389,286.4-4-~-$-296.45--$384,195.33~_.'li 3~,491.7S$10~!7Q~

DIVISION NO. 2.
-~- - - - - - - - - - - - - c - - - - - - - - - , - - - - - - - c - - - - - - - - - , - - - - - - - - - - - - - c - - - - - -

2-L ________ .. _______ _

1$ 2,924.96

$ 50,601.46

22--43___-_-_-_-_-_---------

2,037.83 847.93

29,041.24 63,930.98

2-6. ---------------------- 1,186.21

75,184.52

2-8 --------- ------ -----

243.10

7,310.78

2-10 __________ ----------- 2,609.130.R. 2-12 _____________________ _ 2,478.36

82,347.16 101,385.21

!$ 707.8101'. 1$ 51,828.26

874.29

25,323.29

948.40

60,060.17

439.33

72,098.10

5.21

7,443.97

3,083.880r.

82,379.59

10,749.670r. 114,046.17

$1 51,120.45
26,197.58
61,008.57
72,537.43 7,449.18
79,295.71 103,296.50

$ 1
2,405.97 4,881.49 3,770.34 3,833.30
104.70 442.32 ' 567.07

Totals

J$ ------$ 7,109.26

$ -~9,801.35

1~,274._l_30r.- $ - 4_l_~l'7~,;5!5_ __ $~__!100,9Q5.42 -~$ l~Q05_~=-~

STATE HIGHWAY BOARD OF GEORGIA

ScheduleNo.6-A-Contd.

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY

UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1935

Districts

IUMl~~:e~~~ed I Allotments I

Net

Expenditures ITotal Charges ~U~lf:~~~~ed
1

_ _ _ _ _ _ _ _ _ _ _ _Jul_.y'------'1,'-1_9_3_4__c___ _ _ _ __.,_E_n_c_u_m_b_rances

June 30,1935

DIVISION NO. 3.

3-4 _______ _ 3-5 ______ _ 3-6 _______ _
3-7--- .. 3-8_------- . 3-9 ________ _ 3-10 _______ _

____ $ 463.91

,$ 8,142.02 $

81:s6cr.'$ 8,335.65 $ 8,253.79 -$-.--3~u-

1,320.49

18,371.99

567.44Cr.l 19,856.93

19,289.49

402.99

1,467.55

12,684.65

107.44

12,271.15

12,378.59

1,773.61

619.330.R.

95,472.45

3,53l.84Cr.l 91,477.20

87,945.36

6,907.76

2,707.59

95,643.09

514.86Cr.l 96,442.36

95,927.50

2,423.18

324.9lO.R. 129,275.72

5,896.06Cr.l 127,793.23

121,897.17

7,053.64

605.08

8,513.00

2l.81Cr.

8,302.61

8,280.80 I

837.28

Totals_

$ __ 5,620.38= $ 368,102.92 -$-10,506.43cr.!$ 364,479.13 _I$ ~53,972.70 1$ 19,75o.6o

Totals_

_1$ 18,311.68

$1,167,190.71 I$ 22,484.11Cr.1$1,161,P54.0l

----- --S-UiVfiVIARIZED-BYCONG-RESSIONAL DISTIHCTS

1_ _ _ _ _ _ ----::!$ 4,782 71

$- 91,575.08 $ 1,262.22Cr. $ 95,974.C6

:$1,139,369.90 $ 46,132.49 . ---
$ 94-,6-9-1-.8-4_$_ -1-,-66-5-.95--

2 __ ._ ______

I

3 _________

1

4 --- ----------- ------I

5__

6

7__

. _________

8

9______

10_________

ll_________

12________ ___

3,476.64
1,017.11
1, 311. 84 1,320.49 2,653.76
619.330.R.
2,950.69 324.910.R.
2,004.050.R. 1,711.27 2,035.46

98,454.33
95,471.37
72.073.00 18,371.99 87,869.17 95,472.45
102,953.87 129,275.72 90,860.16 148,512.01 136,301.56

620.12Cr. 95,754.19

95,134.07

277.75

91,132.04

91,409.79

866.54

68. 395.82

69.262. 36

567.44Cr.: 19,856.93

19,289.49

546.77

84,369.25

84,916.02

3,53l.84Cr. 91,477.20

87,945.36

509.65Cr. 103,886.33

103,376.68

5,896.06Cr. 127,793.23

121,897.17

3,105.69Cr. 529.15
9,19l.30Cr.

90,682.20 1 87,576.51

145,606.24 I 146,135.39

146,926.52

137,735.22 I

6,796.90
5,078.69
4,122 .48 402.99
5,606.91 6,907.76
2,527.88 7,053.64 1,279.60 4,087.89
601.80

Totals_____

__ $18~31i-:68-- $1,167,190.71 $--22,484.11Ch.l$1,161:854.01-i$1,139,369.9o- $-46, !.49~-

Schedule No.6-B

STATE HIGHWAY BOARD OF GEORGIA

DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS

JUNE 30 ' 1935

'

Unencumbered

Unencumbered

Allotments Allotments

Net

Expenditures Total Charges Allotments

July 1, 1934

Encumbrances

June 30, 1936

GENERAL ADMINISTRATION ALLOTMENTS GENERAL OFFICE

I

GM.tOnc. .-O--l-a-i-m--s-_-_-_-_-_-_-_--_-_-_-_-__-_-_-_-_-_-_-_-_-_-_-_-_-_-_--_ '$

188,756.45 4,737.77

Const .Claims___________________________ _
~ Other Claims _________ ---1- ______________ _

5,461.31 672.40

J ______________ Totals ______________

1_$_1_9_9,6_2_7.9_3_

I $ 2,028.08 $
----------------------------------------------

186,728.37
4,737.77 5,461.31
672.40

$ 2,028.08 $ 197,599.85

+______________ Warehouse _____________

WAREHOUSE
-I$ 13,295.93

13,348.89

DIVISIONS

I

Div. No. L _______________________________ $ 9,185.50 $

2________________ ----------------

8,959.82

3_--------------- ----------------

10,705.23

77.17 $ 9,108.33

14.94

8,944.88

1.90Cr. 10,707.13

Totals _______________________________ $ 28,850.55 $

90.21

28,760.34

1: T

otals

-------1
_______________________________ $

------
241,774.41

-I1 $

-----
2,065.33

-

239,709.08

$ 188,756.45 4,737.77 5,461.31 672.40
$ 199,627.93

----------------
----------------
-------------------------------
----------------

13,295.93
1----------------

$

9,185.50 8,959.82

----------------
----------------

10,705.23 ----------------

1--$--28,850.5--5--)---------------1$ 241,774.41 --- ------------

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-B-Cont'd.

DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS

JUNE 30, 1936

Unencumbered

Unencumbered

Allotments Allotments

Net

Expenditures Total Charges Allotments

July 1, 1934

Encumbrances

June 30, 1936

OTHER ADMINISTRATION ALLOTMENTS RESEARCH & ANALYSIS

~ Analysis ______ - _______ --- __ --- __ --- _____ - $ Research _______________ - ----- ____ -- --- --
Totals _______________________________ $

116.84 $ 181.55
298.39 $

116. 84 6.16
123.00

-- --- --- ---- --- - $

$

175.39

$

175.39 $

116.84 181.55
298.39

COLLECTION OF REVENUE
Totals ______________ -1- _______________ ,$ 39,020.14 1--------------- -I$ 39,020.14 1$ 39,020.14 1----------------

-I$ Totals _______________ ,_______________

QUARRY

1$ 1,187.10

30.00 1$

1$ 1,157.10

1,187.10 /----------------

STATE HIGHWAY BOARD OF GEORGIA DETAIL OF EQUIPMENT UNENCUMBERED ALLOTMENTS
JUNE 30, 1935

Schedule No.6-C

Unencumbered

Unencumbered

Allotments Allotments

Net

Expenditures Total Charges Allotments

July 1, 1934

Encumbrances

June 30, 1935

Mtn;~~~;:~ ~ ~ ~- ~ _~~~~~::I~~~~~~~~~~~:~:~~ l-$-----~-- Admins. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Constr. _____

g

_

I ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~~ ~ _ $
1

1,796.37 12,433.04
2' 114.27

1$
I~~~~

483.75Cr.$ 1, 867. 58Cr.
-----------

2,280.12 14,300.62
2,114.27

$

--~~--

1

I 16,343.68 1$ 2,351.33Cr. $ 18,695.01 1$

1,796.37 12,433.04 2,114.27
16,343.68

-------- ~ -----
---------- -----
-------- -------
--~-
I~~~~~~~~ -------

STATE HIGHWAY BOARD OF GEORGIA MAINTENANCE APPROPRIATION JUNE 30, 1935.

Schedule No 6-D

Appropriation For Fiscal Year 1934-35-Based upon $10.00 per Mile _______________ -------------------
Special Appropriations-Bridge Repairs,etc

~1.083 ,57o.o5 103,144.57

Total.hailable --------------------
Deduct Unallottcd Appropriation Balance at June :30, 1935-Closed into Surplus _________ _

$1.186.720.62 12,567.12

Net Available ____ _
DEDUCT: Allotments for Year Maintenance General Division No.!__ Division No.2 ________ _ Division No.3 __

$1.174.153.50

----------------- $ 389.2811.44 409.801.35 3138,102.92

$1.167,190.71

Maintenance Administration

Compensation Claims _____________ _

Maintenance Equipment _________ _

Shop_________

___________________ $

Less: Shop Billings_____________________

234,044.24 233,933.49

4,i3i.ii 2,114.27
110.75

Total Allotments __ Appropriation Balance, June 30, 1935 _____ _

$1,174.153.50 0.00

51

STATE HIGHWAY BOARD OF GEORGIA ADMINISTRATION APPROPRIATION JUNE 30, 1935.

Schedule No. 6-E

Appropriation For Fiscal Year 1934-35................ . Deduct l"nallotted Appropriation Balance at June 30, 1935-Closed into Surplus ..
~et Available __________________ _
DEDUCT: Allotments tor Year General Administration Division No. L---------------------Division No.2 ... -------------------Division No.3 ..... ------------------

$500, 000 .00
222,457.73 $277,542. 27
$ 9,185.50 8,959.82 10,705.23

Total Divisions______________________________ General Office __________ ... ________ ... $278,021,79 Less: Blue Print Billings............... 89,205.34

$ 28,850.55 188,750.45

Compensation Claims ________________ _ "rarrhousc__________________________ _

6,133. 71 13,295.93 $237,036.64

Other Administration Allotments Research and Analysis _______________ _ Less: Test Billings___________________ _
Collrction of Revenue________________ _ Quarry _____________________________ _

$ 27,197,82 26,899.43

298.39
39,020.14 1,187.10

Total Allotments......... -----------------

$ 277,542.27

Appropriation Balance, June 30, 1935--------------------------------

0.00

52

BTATB HIGHWAY BOARD OP G'BOB.G'lA

Bchedu\e'No.,

SUMMARY OF ESTIMATED PARTICIPATION; ALSO B.EJ'LECTING B.ECONCILIATION

WITH REVENUE RECEIPTS

I JULY 1, 1934 TO JUNE 30, 1936

Estimated

Fund Revenue Revenue Receipts \

Estimated

Participation

Accrued

Participation

State Treasurer

July 1,1934
I

June 30,1935

Motor Vehicle ___________________________ --------------------$ 1,206,051.30
Gasoline Tax ____________________________ -------------------- 9,655,076.41

$ 1,206,051.30 9,655,076.41

---------------------------------------

Total State Funds _____________________ -------------------- $ 10,861,127.71 $ 10,861,127.71 --------------------

u .S. Government

National Recovery Projects _____________ $ 3,821,818.99

Other Federal Projects__________________

33,898.80

$ 5,885,632.19 35,041.16

$ 6,187' 103.47 45,286.87

$ 3,520,347.71 23,653.09

Total Federal Funds_-----------------$ 3,855,717.79 $ 5,920,673.35 $ 6,232,390.34 $ 3,544,000.80

ther Construction Funds Counties-Cash for Construction-pri-
or to Refund Act______________________ $ Railroads, Counties and Cities-Cash
for Construction______________________ Railroads, Counties and Cities-Con-
tract for Construction ________________
Total Other Funds __________________ $

12,215.50Cr. -------------------- --------------------$

41,530.13 $

18,900.40 $

28,446.52

342.77 -------------------- --------------------

29,657.40 $

18,900.40 $

28,446.52 $

12,215.50Cr. 31,984.01
342.77 20,111.28

M iscellaneous Income _____________________ --------------------$ Estimated Participation,7-l-34_ ________ $ 3,885,375.19

22,757.91 $

22,757.91 --------------------

Fund Revenue Accrued _________________

$ 16,823,459.37

Revenue Receipts ___ ___________________

$ 17,144,722.48

Estimated Participation, June 30,1935--Exhibit "A" ___________________________

$ 3,564,112.08

Schedule No. 8.

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF EXPENDITURES BY OBJECT CLASSIFICATION

OBJECT OF EXPENDITURE

JULY 1, 1934 TO JUNE 30, 1935

I I I I(S::.a~:.i:E) I [ Analysis

Analysis

Analysis

Analysis

Total

I (Sch. No. 8-A) (Sch. No. 8-B) (Sch. No. 8-C) (Sch. No. 8-D) Legislative

Net

---~~---

--

1------ ~-Ml EMOR~Il_U_M~------

Net

Inter-Depart-[ Gross

~--~~--

Administration Construction Maintenance Equipment

Transfers Expenditures Expenditures .mental Billings Expenditures

Personal Services_________ ------------~$ Equipment Expenses __________________ )
Equipment Purchases_________________ Communication Services _____________ ] Heat,Light,Powerand Water__

176,843 33)$ 2,281 391
__ _______ 15,719.69
1
3,592.33)

692,177 .lfJ1$ 607,017 .22~-------------+-------------1$ 1,476,037. 71 $ 1,476,037. 71:$ 159, 118.10'$ 1, 635,155.81

304,722.70

417,348 4.) ______________ ______________

___________ -------------- $ 18,695.01 1--------------

3,064.97

7,170 371]-------------- --------------

724,352.54 18,695.01 25,55 03

724,352.54

8,560.52

18,695.01 --------------

25,955.03

984.08

732,9J:l.06 18,695.01 26,939.11

3,0ti6.70

976.96,______________ _

7,635.99

7,635.99

2,603.78

10,239.77

Rent-------------------------------

3,599.001 ti4,524.80

4,204.86-------------- __

72,328.1l6

72,328.6ti

50.00

72,378.66

Tmveling Expenses___________________

39,945.33

76,689 67)

21,579.01 _______

138,214.01 138,21401

4,394.93 142,608.94

Supplies and Materials________________

5,134.40 783,179 59 104,21\1.96 ______

__ 1_

892,575.95 892,575.95 172,013.27 1,064.589.22

1 1 1 11 1 ~ IPnr_suntrlanrgic,eB__.n-d-.-n-g-,- ;u-b--_-c ~t-l~.-e-t_c_______--_-__-_1

3,566.77 5,833.8611

3,323.47 274.06

13,284.43-----45.31______

~;:;:~:~;:;~~~;~;:~i~~;:~~~~~;~~.:-~~::ri,,_$-=-~~:~~:~~-~:~~F~~-~~1Ii- ~ " ~

1'""":"""~: ~;~:~iJ :li]Ui=~ ""~ :~:J;E 1
---1-

20,174.67 6,1.13 23

20,174.67 6,153.23

372.30 5.35

20,546.97 6,158.58

Total Administration-Exhibit "C" ___

1
280,061 71

~===-=

I

Total Construction-Exhibit "C" __________________ $11,619,991 31

1 1

Total Maintenance-Exhibit "C"--------------

------------ s 1,17ti,073

Total Equipment-Exhibit "0"-------------, Total Legislative Transfers-Exhibit "C" ___________________ _

__ '_~::_~:~:- 18,695 011

,.c= -----

I

----------- -------------!$ 2,060,606 li2)

Total Expenditures-Exhibit ''C" -------------------

--------------- ---- -- -=~:~-~~-/~::~5~~7

$15,155,427.87$ 350,098.26$15,505,526.13

ST,.TE HIGHW"'Y BO,.RD OF GEORGI"' "'NALYSIS OF ADMINISTRATION EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 8-"'

GENERAL ADMINISTRATION

RESEARCH AND ANALYSIS

OBJECT OF EXPENDITURE '~~--G- ene- ral-~ l~:~epart- 1,-Net Genera~ -~~a~~ and~- lnter-De;rt]---;,;;---

______ AdministratiOn Imental B1llmgs Administration __Analy~ 111!l:l!lf~"'_!JS_ ~sear_ct'__
1

Collection of

Quarry

Revenlle_ _

Total Net
Expenditures

Pers?nal Services________________ __ , $ 232,978 86 $ 77,388.57 $ 155,590.29 $

EqutpmentExpenses___________ __ Communication Services_______________ ,1

2,092.39 1 ___________ 15,5:34.34 1

2,092.39 15,5:34 34

Heat, Light, Power and Water_ ________ '

3,592.3:31

3,592.33

Rents_______________________
g: Traveling Expenses__________________ Supplies and Materials ____________ --~

3,599.00 21,304.78 16,979 17

11,876.77

3,599 00 21,304.78 5,102.40

~~:~;i::~eBl~dl~~:~;~bl~~i-t~:-~t-c~~:- --:1 ~:~~~ ~~ ---:- __: _ : ~:~~~ ~~ __

Indemnities ______ ---------

---~

21,ii12 14

21,612.14

Special and Miscellaneous Expenses----

1,880 78

1,880.78

18,225 67 $ 18,225 67!__

1,111 28

935 891 $

8.39

8 39 ___

G03.34

903.34

2,743.98 -----2:74;]-ggI::::::

2,096.88

2,096.88!------

27 00

27 00



___ __,:_-_

175 39
___
:__:_-_~ ___

20,209 54 184.95

1,04:3.50 13 61 .40

18,593 65~---

46.90

oo :J2

___

-_- ------~1--_:_:_:_:: _-_ __ : _-_-_-_:__-

1,958.28

1,958 28i-

_

_

_

52 69

176,843.33 2,281.39 15,719 69 3,592.33 3,599.00
39,945.:33
5,134.40
~:~~~ ~~
21,612.14 1,933 47

Totals_________________________ l~8,974.42---;265 34 239,709.08

27,074.82 ~~,;;, ;- --1;;;-;;,--;---;;-,02~ 14 ;-1,157 101_ _ __

===!====== =====.,========:r==

, - - - - I ----~1 -----

Total Administration Expenditures-Exhibit "C" ------ __ ___________ __ -----------~---------- ---,--------------~--------------~,-------------- -------------- $ 280,061.71

----------

--------

STATE HIGHWAY BOARD OF GEORGIA

Schedule No.S-B

ANALYSIS OF CONSTRUCTION EXPENDITURES BY OBJECT CLASSIFICATION

JULY 1, 1934 TO JUNE 30, 1935

Object of Expenditure

Surveys
Actu~~ Plans

Total

Construction

Total

Supervision Direct ~--T-otal~ Expenditures

--~--1

Personal Services______________ $ Equipment Expenses __________ Communication Services ______

49,016.87 ------------$ 921.85 -----------62.98 ------------

49,016.87 $ 327,873.53$ 921.85 3,951.65 62.98 1,150.69

315,286.761$ 299,849.20
1,851.30

643,160.29 $ 303,800.85
3,001.99

692,177.16 304,722.70
3,064.97

Heat,Light,Power & Water ____ TRreanvtesl_i_n_g__E-x-p-e-n-s-e--s--_-_-_-_-_-__-_-_-_-_-

---------11.10
6,602.65

Supplies and Materials ________ 2,492.04

Insurance ________ . ----------- ------------

--------------------------------------------------------

-----------11.10
6,602.65 2,492.04
------------

-----------358.54
65,244.09 14,087.01
18.00

3,066.70 64,155.16 4,842.93 766,600.54 3,305.47

3,066.70 64,513.70 70,087.02 780,687.55 3,323.47

3,066.70 64,524.80 76,689.67 783,179.59 3,323.47

Printing,Binding,Publicity,

Etc. _______ -----------------

261.61 ------------

261.61

9.15

3.30

12.45

274.06

Payments to Contractors _____

700.00 ------------

700.00 --- -------- 9,470,838.02 9,470,838.02 9,471,538.02

Special & Mise. Expenses ______ 91,523.56,$ 88,338.32 179,861.88 31,308.671

6,259.62

37,568.29 217,430.17

~----,

'

------,~----- --~~

Totals ___________________ $ 151,592.66,$ 88,338.32 $ 239,930.98,$ 444,001. 33 $10,936,059.00 $11,380,060.33

,$11, 619,991.31
Total Construction Expenditures-Exhibit "C" ______________________________________________________ _ ----- I

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF MAINTENANCE EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 8-C

GENERAL MAINTENANCE

\

RECONSTRUCTION

I

SHOP

OBJECT OF EXPENDITURE

- Sup- ervi- sion-

PersonnJ Services ________ _

38,313.17

Direct 563' 453.45

-==1 ---s=-1- == Total

Direct ~--T=~-

!"et~;~~:~~~;s- S~~-

861--~=3 601,766.62 --- -------- $ 5,250 601 $ 5,250 60---:.503

86

Equipment Expenses _____ _

83.40 415,830.22 415,913.62--

1,434.83

1.434.83

7,624.63

7,624.63------------

Communication Services __ ~ Heat, Light, Power and
Water ________________ _ Rents__________________ _
Traveling Expenses ______ _

5,337.73
45.80 579 50 16,351.25

1,832.64
931.16 3,585.36 5,219.26

7,170.37 ------------ --------------

976.96 ------------ -------------- ---------

4,164.86------------

40.00

40.00

21,570.51 ------------

8.50

8.50

975.69
1,700.44 50.00
1,650.95

975.69
1,700.44 __ 50.00 --
1,650.95 --

Supplies and Materials. __ _ Insurance ______________ _

1,809 58 285.00

94,985.32 12,999.43

96,794.90 -----------13,284.43 -- --------- --

7,467.06

7,467.06

158,039 62 345.30

158,039.62-----------345.30 ------------

Printing, Binding,

Publicity, etc _________ _

21.85

23.46

45.31 --

5.35

5.35

Payments to Contractors __ ---------------------------------------------------------------------------------- ___ ---------- __ -----------

Special and Miscellaneous

Expenses______________

83.55

82.88

166.43

16.72

1.50

18.22

37.65

37.65 ------

Totals_________

62,910.83 $1,098,943.18 $1,161,854.01

16 72 14,202.49 14,219 21~~3,933.~; $ 233,933 49~=~~~

~~=c==-

l==c==c~==',c-==~ - = = = ' = = ' - t = = = = c =

Total Maintenance Expenditures-Exhibit "C" ------ _________ -------- ____________________ ------------- _________________________________________________ -----

Total Net Expenditures
607,017.22 417' 348.45
7,17037 976 96
4,204.86 21,579.01 104,26196 1:l' 284.43
4.5 .31
184.65
$1,176,073.22

Schedule No. 8-D

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF EQUIPMENT EXPENDITURES BY OBJECT CLASSIFICATION

JULY 1, 1934 TO JUNE 30, 1935

============================~====~~===-

Ex~~~eJi\~:es

I At~~ii~~-~' Co~~~~uc-~I M~~~=n-

Total Expendi-
tures

Trucks ______ _______ I$

4, 581. 80 I __ _ ____ 1$ 5, 066. 80

Road Machinery, I Misc. _ _____ ___

I

1
7, 678. 70 $

1, 371. 98 I

9, 070. 03

Office Equipment __

___ _ __ I ______ I 1, 775. 77

Engin3ering Equip-~
~~1rioutvment f :____I __2._o4o._1~~-- ~~:~~~-2j~Jt

Totals _______ $ 2, 280.12 $1 14,300.62 ]$ 2, 114.27 ]
1
1
Total Equipment Expenditures-Exhibit "0"---------\$ 18,695. Ol

Schedule No. 8-E
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF LEGISLATIVE TRANSFER EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Transfer 1 Motor

Object of

General

Vehicle Con-

Total

Expenditure

Fund

License vict Expendi-

1935 Act I Tags

Farm

tures

------c-1 --- ------------I ----------'c-1_ ______.:__ _ _ __

Special & Misc. Ex-

;

I

1
pense Transfer oft

1

I

Funds _____________ 1$2, ooo, ooo. oo 1$ 60, 059. 69 $546. 93 _$2_,_o_6o_._6_06_._62_

Totals ___________ $2, 000, 000. 00 I~ 059. 69 ]$546. 93 1
1
Total Legislative Transfer ExpendituresExhibit "0" ____________________________________ $2, 060,606.62

1

58

Schedule No. 9
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF EXPENDITURES BY CONGRESSIONAL DISTRICTS
JULY 1, 1934 TO JUNE 30, 1935

,

I

I (Analysis) I (Analysis)

(Analysis) .(Analysis); (Schedule 1 (Schedule
Dis- rschedule '(Schedule' No.10-D) 1I No.lO-E)

tricts No.10-B) I No.10-C) I Mainten- . Recon-

:construction Surveys

ance , struction

Total Expendi-
tures

--,------~-----------.--~--

-------

No. 1 $ 9?6, 498. 34 1$ 8, 185. 11 $ 95, 974.06.$ 1, 282.86 $1,081, 940. 37

2

6D1, 938. 74 10, 662. 69 95, 754. 19' ... _........ . 758, 355. 62

3

796, 754. 24 15, 732. 94 91, 132. 04 . . . . . . . . . . . . . 903, 619. 22

4

841, 134. 44 19, 425. 281 68, 395. 82 .. .. . .. .. .. .. 928, 955. 54

5

424, 337. 25,1 40, 778. 55: 19, 856. 93.......... ... 484, 972. 73

6 1, 314, 039. 03 14, 935. 35' 84, 369. 251'.... .... .... . 1, 413, 343. 63

7

953, 107. 96 34, 644. 17, 91, 477. 11 324. 57 1, 079, 553. 81

8 1, 242, 775. 94 14, 159. 841 103, 886. 33\ 3,047.10Cr. 1, 357, 775. 01

9 1, 091,059. 42 19,822. 761 127, 793.32, 7,346.63 1, 246,022. 13

10

701, 193. 63. 11,044. 60, 90, 682. 201............. 802, 920.43

11 1, 104, 812. 871 28, 751.06 145, 606.24 ............. 1, 279, 170.17

12 1, 282, 408. 47 21, 788. 631 146, 926. 52 8, 312. 25 1, 459, 435. 87

I

-~~~~~------------

Totalsl$11, 380,060.331$239, 930. 98,$1,161,854.01,$14, 219.21 I

Total Expenditures Distributed by Districts ............ $12,796,064.53

Undistributed by Districts Administration General Office..... $ Warehouse ........ DlViswns ........ .. Research __ .. _____ .
Collection of Revenue............ .
Quarry______ ____ _

197,599.85 13,348.89 28,760.34 175.39
39,020.14 1, 157. 10

$280, 061. 71

Land, Buildings & Equipment_ .. _. __ .
Legislative Transfers
Prison Farm Purchase............
Motor Vehicle Li-
cense Tags. ..... Transfers-Gen-
eral Fund-1935 Act._____________

$

546. 93

60, 059. 69

2,000,000.00

$ 18, 695. 01 2,060,606.62

Total Expenditures Undistributed by Districts ..... _.. $ 2, 359, 363. 34

Total Expenditures-Exhibit "C" --------------------- $15,155,427.87

59

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENDITURES BY DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935

Schedule No.10.

Divisions

I (Analysis)
(Schedule No. lO-B)
Construction

Div. No. L ____ $ 2_---3 _____

3, 197,353.35 1$ 4,318,482.42 3,864,224.56

Totals____ -I$ 11,380,060.33 $

(Analysis) (Schedule No.10-C) Surveys
67,929.67 58,906.39 113,094.92

I (Analysis) (Schedule No.10-D) I Maintenance
$ 384,195.33 413,179.55 364,479.13

239,930.98 $ 1,161,854.01

(Analysis)

(Analysis)

(Schedule

(Schedule

No.10-E)

No.10-A)

Reconstruction Administration

Total Expenditures

$

B l 5,834.13 I$ - 9 , 108. Bs~$-3, 664, 420.

3,760.98

8,944.88

4,803,274.22

I 4,624.10

10,707.13

4,357,129.84

$ 14,219.21 ~-$--28,700341

Total Expenditures Distributed by Division Units______________________ __________ ___

0>
0 Undistributed by Division Units

Administration

General Office___________________________ _________

.$

Warehouse ___________________________________________________ _

Research ___________________________________________________ _

Collection of Revenue _________________________________________ _

Quarry________________________ _______________ _________________ _

197,599.85 13,348.89 175.39 39,020.14 1, 157. lO $

___ $ 12, 824, 824. 87 251,301.37

Land, Buildings and Equipment _________________________________ _

18,695.01

Legislative Transfers Prison Farm Purchase ___________________________________________ $ Motor Vehicle License Tags ____________________________ _

546.93 60,059.69

Transfers-General Fund-1935 Act ______________________________ _ 2,000,000.00 $ 2,060,606.62

---------------

Total Expenditures Undistributed by Division Units ____________________ _

-$

2,330,603.00

Total Expenditures-Exhibit "0" ___________ _

________ $ 15,155,427.87

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENDITURES BY UNITS
JULY 1, 1934 TO JUNE 30, 1935

Furnishing

Special

Heat,

Printing,

and

Personal Equipment Communi- Light,

Traveling Supplies

Binding, lndemni- Miscel-

Total

UNIT

Services Expenses cation Power and Rents Expenses and Insurance Publicity, ties

laneous Expenditures

7r_ _ _ _ ________________________________________ Services Water

Materials

Etc.

Expenses

GEN~"':~is~::!;,~------------------ J s 32,707 ...------1----------1--------J_________ $6,523

s 39,231.32

~~n:::~:E~~~~::~~-::::::::::::::

3~.9:.5H6~3_~3~23 6 2 2 ::::::::_: ::_:-::::_ -

-

~ -

:~ ~ :

::-:--:-

- ;;~o:; - ::

: .:: :14!1.:66~9;91.~9:88

Accounts........ ________________

_________ _ _____ __ __ _______ __________ 2,136.65---------- ---------- ---------- ---------- ----------

Statistics________________________ 7,507.50 ---------- ---------- ---------- ---------- 120.65 ---------- ---------- ---------- ---------- ---------- 7,628.15
~~:~:~~:~;~~-c-1~;~~::::::::::::: ---~::~::.~~ :::::::::r:::::::: :::::::::: :::::::::: :::::::::: :::::::::: :::::::::: :::::::::: sio:s7i:48 :::::::::: :~:~~; :~

Undistributed.. __________________ 10,498.50 $1,332 05i$10,45~~~228.~ $3,021.50 ~ $13,485.34 $2,601.73 ~~7.63 10,740.66 $1,340.07 ~~

TOTALS __________________

$207,725.53

$1,332

1
05 $10,459

281 $3,228.91

$3,021.50$16,224.78$13,485.34

$2,601.73

$5,833.86!$21,612.14

$1,340.07

$286,865.19

Less: Blue Print Billings______ . ____ -~~~8 57 .:_::.:_::::_:_:_:_:_::1.:.:.:.::.:..:. .:.:.:.::.:..:. .:..:.:.:_::_:_:_:_:_::1.:.:.:.::.:..:. 11,876. 77 .:.:.:.::.:..:. .:.:.:.::.:..:. .:..:.:.:.::_:_ ___ ._. _. _. 89,265.34

TOTALS.. ________________ $130,336.96 $1,332.05$10,459.28 $3,228.91 $3,021.50$16,224.78 $1,608.57 $2,601.73 $5,833.86$21,612.14 $1,340.07 $197,599.85

1----!1~--- ---------~------~-~-------------1~---

WAREHOUSE.. _____________________ $ 10,165.83 405.07 $ 26045 $ 296 34 ---------- $ 882 90 $ 776.59 $ 21.00 ---------- ---------- $ 540.71 $ 13,348.89
l----l---------------~-~--------------~-----1----

DIVISIONS Number One____________________ _
Number Two ___________________ _
Number Three_. ___ ._ ......... __ _

4,540 00 4,342 50 6,205 00

24 251 $1,439 63 38 96 1,942 86 292 06 1,432 12

16 05 $ 577 501 $1,387 45 $ 791 59 $ 331 86 ---------- ---------- ---------- $ 9,108.33 10 03 ---------- 1,404 25 978 04 228.24---------- ---------- ---------- 8,944 88 41 00---------- 1,405 40 947 61 383 94 ---------- ---------- ---------- 10,707 13

1---~---~~---~---~-~-----------------------

TOTALs __________________ Total Genera! Administration______

$ 15,087 50 $155,590 29

$ 355 27 $4,814 61 $2,092 39 1 $15,534 34
1

$ 67 08 $ 577 50 $4,197 10 $2,717 24

33~~599 781~102 1

$3,592

00,$21,304

40

$ 944 04 ---------- ---------- ----------
$3,566 771 $5,833 86 $21,61214 $1,880 78
1

$ 28,760 34 $239,709.08

UNIT

Personal Servicei

Schedule No. 10-A-Conl"d.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF ADMINISTRATION EXPENDITURES BY UNITS

JULY 1, 1934 TO JUNE 30, 1935

-

-

Furnishing I Heat,
Equipment Communi- Light, Expenses cation Power and
Services Water

Rents

Traveling Supplies Expenses and
Materials
1
i

Insurance

Printing, Binding, Publicity.
Etc.

lndemnities

Special and
Misoellaneous Expenses

To tal Expen ditures

~ RESEARCH AND ANALYSIS

----1 Division of Tests ___________ _

Division of Research _______ _

$

935 89 175 39

8 39
I

I
903 .34

$2,743.98 $2,09G.88

I
27.00 -

$1,958.28 $ 2G.8\l9.43

I

175 39

I --------

TOTALS ____ _ LesR: Te:;;t Billings ___ _
TOTALS _____ _

s 18,225 oil $1,111.28

s 8 :J9 1 903.34 __

I 18,225 671 935.891

8 39 1 903 34:-

----~~---~~~-~--~--$~,;;9~1 ---~-~-~ :1 ~--~~~~~-

=-_: - - ' -1 $2,743.98 $2,096 88 $
-- 2,743 98 2,091i.88
__ _ _ l____ i

27 oo.

_________ , $1,958 28, $ 27.074.83

27 00 --

--------- 1,958.28 21i,8\1943

--:=~~ ~~~ ~I1 .~~-~~-;- - 175.39

_, _ _ _ _ _ __

--~~;~9J;~~~]~~~~9:!~~~ ~~-~ ~~~3 COLLECTION OF REVENUE Enforce of Revenue Laws ____ _

r,sl $ 32 oo!

J

~ ~~~=: 14

QUARRY _____________ _

I $ 1,043 so s 13 61 $

40 1

46.90 :-----~-----~~ - - - - - - sz 6~ -;-~~~-1~

TOTAL ADMINISTRATION___ ~~~~;-3~:~~~~~;~~~;;69 $~5~2_;; --;3~599 oo:s;~~~~ ~~~44~~ $~51iG7<__$s~~3_81i $21,612 14; ;~;;:;~ ~280,061 71

I

I

--------------------

! -------

8TA,._ H - A Y - OP - A ANALYSIS OP ACTUAL CONSTRUCTION UPENDITURIUIBY CONGR-IONAL DISTIIICTII AND DIVISIDM ut11'1'S
JULY 1, 1934 TO JUNE 30, 1135

___,__

Personal Services

1 Furnishing'

Equipment Communi- Heat,Light,l.

I I Expenses

cation I Power and
I Services Water

Rents

\ Traveling \ Su=~~os \ Insurance\ ~~~:~:: \ Payments to \ Sp:::.~~d \ Total

Expenses Materials .

Publicity Contractors laneous Expenditures

Etc.

Expenses

District No. !_____
~:::::
4_____
~:_:_: :
8_____ 9_____
10_____
11_____ 12...

29,179.55
~~:;~!:;~
19,951.11
iE~H~
33,495.71 38,878.57
17,440.62
34,451.54 32,844.33

288.47
2~;:!~
185.89
HUr
608.14 651.37
54.64 426.17 398.26

CONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS

201.12 6,685.11 S 1,032.83[ $ 1 __________

------------

$

1.87 ----------~--------------

::~:~~~1:::::::::: s ~~:~~ ~:;~::~: 1.~~~:~: :::::::::: -~----~:~: ::::::::::::::

15.32----------

50.00 4,573.95

933.81

1.00 _________ _!______________

~nL:~:~~~:~ -------4~:~~ H~U~ d:U~~::::::i:~~ :::~~~::::!::~~~~:::::~:~

103.98---------92.27---------69.35---------246.92 ---------87.28----------

28.50 15.00 67.40 4.00 45.00

6,530.75 6,372.43 4,703.73 7,643.30 7,057.77

1,779.471'---------- ----------~~--------------

1,357.03

5.61 ---------- --------------

839.64

1.87---------- --------------

1,613.64 1,718.991

1.00

4.58 --------------

2.91-- _______ !______________

2,765.281 $ 40,151.23
~:~:;::: ~!:~1~:;~

2,144.55

27,855.63

HH:!! iUiU!

2,887.44 2,870.17 2,351.92 3,473.46 3,467.55

45,433.99 50,242.45 25,529.17 47,864.61 45,622.09

TOTALS__________ S 327,873.53! $ 3,951.65 $1,150.69 ==-$-358.54 $ 65,244.09 $ 14,087.01~~;:-~-;~! ___________ __I$ 31,308.67 -;-~~~~;;;
= = = = ======.===== ====!==== ======1======,==== = = = = = =====,======

CONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS

s s District No. !__ ___

36,454.53 $ 32,097.14 $ 71.90 $ 39.52 $ 126.50 $ 733 0 50 $ 64,963.32 $ 520.26 $ 3.30 $ 801,267.14 $ 67.00

936,344.11

2__ ___
s__ ___

10,223.62 14,857.70 26,095.71 2,374. 70

140.04 30.82

411.87 46.03

150.00 8,544. 71

82.39 33,558.30 609.75 15,006.15

-- 174.13 ---- -~-57.00 ----------

565,669.51 709,823.32

407.44 121.95

625,675.00 762,710.14

L ...

15,948.10 26,205.36 214.65 551.55

103.00

453.28 35,343.50 178.13 ----------

5_____ -------------- ------------ ---------- ---------- -------------- ----

2, 799.26 ---------- ----------

733,942.14

339.10

398,449.55 -----------

813,278.81 401,248.81

6 ----

17,164.29 11,660.67

50.52- -------- 18' 609 0 72

105.15 70,824.83 ---------- ---------- I, 157,587.42

67.26 1,276,069.86

7__ ___
8 ____

52,038.37 49,980.32 13,945.70 8,009.86

235.82 24.06

653.64 7,280.87 23.80 11,615.57

546.25 96,471.21 336.00 ---------- 704,998.58
195.24 36,704.36 ---------- ---------- I, 126,793.85

633.19 913,174 0 25 29.51 1,197,341.95

9..... 10 _____
II__ ___
12.. ...

40,989.56 39,448.77
13,523 03 14,954 01
"%,'"I ".'"Mt 49,946.46 65,996.811

316.61, 14.10
"'"I597.51

17.56 29.50
"".'"759.53

5,175.01 12,101.48
273.30 175.00

326.59 204.65 946.14 639 0 99

82,718.12 65,800.04 84,237.33 178,174.12

629 0 72 ----------

119.43
634. ooi

-_-__-_-_-_-_-_-_-_-

656.801.:..:.==

869,888.28 568,904.66 896,144.47 937,369.10

1,306.75 13.56
802.80 2,471.06

1,040,816.97 675 '664. 46
1,056,948.26 1,236,786.38

s s TOTALS__________ 315,286.76 $299,849.201 S1,851.30[ $3,066.70 64,155.161 $ 4,842.93 $766,600 0 54 $3,305.47 $

' 3.30 $9,470,838.02 6,259.62$10,936,059.00

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 1D-B-Cont'd.

ANALYSIS OF ACTUAL CONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1934 TO JUNE 30, 1935

Personal Services

Equipment Expenses

IFurnishing

I Communication

I1HPeoawt,eLrigahndt,

Services Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing, Binding, Publicity
Etc.

Payments to Contractors

Special qnd Miscellaneous Expenses

Total Expenditures

CONSTRUCTION SUPERVISION BY DIVISION UNITS

~ Division No. L ___ _ 102,444.23

942.76 688.52 ----------

149.00 $ 19' 693.00 4' 128.19

1.00 $ 9.15 -------------- $ 10,183.47 138,239.32

2 ____ _

96,507.12 1,477. 72 158.26 ----------

117.40 24,260.47 5,018.94

7.65 ---------- -------------- 11,139.06 138,686.62

3 ____ _ 128,922.18 1,531.17 303.91 ----------

92.14 21,290.62 4,939.88

9.35 ---------- -------------- 9,986.14 167,075.39

-------1-----1---- -------------------- ----1-----1----1------

TOTALS_________ _ 327,873.53 3,951.65 $1,150.69 ---------- $ 358.54 $ 65,244.09 $ 14,087.01 $ 18.00

9.15-------------- $ 31,308.67 444 '001.33

1==~~1

CONSTRUCTION DIRECT BY DIVISION UNITS

Division No. L ____ 2 _____

$

82,806.48 124,537.60

$ 56,794.49 145,500.03

$

328.03 946.78

$1,013.12 1,358.58

$ 8,968.01 31' 115.70

$

1,899.03 1,839.12

$149,717.74 395,976.79

$ 865.13 ----------
1,474.62 $ 3.30

$2,755,322.81 3,474,152.30

$

1,399.19 2,890.98

$3,059,114.03 4,179,795.80

3 _____

107' 942.68 97,554.68

576.49

695.00 24,071.45

1,104.78 220,906.01

965.72 ---------- 3' 241,362.91

1,969.45 3,697,149.17

---- - - - -----

TOTALS__________ $ 315,286.76 $299' 849.20 $1,851.30 $3,066.701 $ 64,155.16 $ 4,842.93 $766,600.54 $3,305.47 $ 3.30 $9,470,838.02 $ 6,259. 62,$10,936,059.00

I

=I

I

I

I

I

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935

-.ollieMo.\.C.

Personal Services

Equipment Expenses

I Furnishing
Communi-~ Heat,Light,
cation Power and
Services Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing, Binding,
Publicity Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

SURVEY ACTUAL BY CONGRESSIONAL DISTRICTS

Ol District No. 1. .....

""

2.....

828.47 3 '902.46

1.65 87.91

21 . 2106!1,_-_-_--__--_-_-_-_-_ -_-_-_-_-_-_ 1

121.12 509.73

41.421--------110.01,.........

-------------

2,721.58 229.30

3,716.50 4,850.51

3 ......
4._ ___
5 _____
6 ____ 7 _____ 8 _____

3,379.58 2' 194.:34 4,328.38 4,477.74 4,507.94 4,417.82

104.76

,47'_ _________ --

18.43---------- ------- $

7.10

45.86

1.00----------------------

31.90

5.05 .......... -

76.58

5.73 -------- -----------

153.87

1.00-

--- ------------

398.34 419.56 290.11 81\1.62 355.52 602.71

114.28 ---------- ---------- --------------

207.10 11 . . . . . . . . . . - - - - -

700.00

147.54---------- $ 14.70 --------

209.92 .......... .....

--------------

151.46----------

6.25

222.28-------------------- --------------

6,364.66 8,457.77 27,041.53 1,670.4:l 17,409.15 1,812.75

10,:362.09 12,004.30 31,869.12 7,214.66 22,512.63 7,210.43

:___________ :________ 9-~---
10 _____

3,955.05 1, 739.35

52.26 25.53

!:~~~-::::----

!!~:~~ :~~:~~

1~5531:.~2~8~:_:_:_:_:_:_:__: __ :_:_:_: ~:~~::;~1 1~:~!!:;~

1L.. 12 _____

8,644.81 6,640.93

138.76 184.34

16.17 ---------- -----------

16.28 __

4.oo

1,279.42 1,065.39

747.49 ---------274.30:------- ..

1--------------- -

9,031.631 5,827.83;

19,911.56 14,013.07

----1---1-----~~-~---,----- - - - - - - -1----- - - - - - - - - - - - - - - - - - - , - - - -

TOTALS __________

49,016.87

921.851 $ 62.98---------- $

11.10 $ 6,602.65 $ 2,492.04 1__________ 1 $ 261.611 $

700.00 $ 91,523.56 $ 151,592.66

I

I

I

_I

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 10-C-Cont'd

Personal Services

Equipment Expenses

Furnishing Communi.. Heat,Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing, Binding, Publicity
Etc.

Payments to Contractors

Special qnd Miscellaneous Expenses

Total Expenditures

SURVEY PLANS BY CONGRESSIONAL DISTRICTS

~ 1 "''''" No.l :

:: : :: J :

~

!lE ;~ t!E l~

I 1 - -- -- - - -

~ ~ ~ ~ M"'__::







t1 11 '!:E!l
1 --------I-$-S-:-:-::-:-:-: --.-:-:--::-:-:

Personal Services

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 1~Con\'ll.

ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1934 TO JUNE 30, 1935 --

Equipment Expenses

Furnishing/ Communi.. Heat,Light,
cation Power and I
Services Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing,
Binding, Publicity
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

SURVEY ACTUAL BY DIVISION UNITS

rn Division No. L ____ $

__,

2_____

3_____

19,166.37 $ 11,806.09 18,044.41

367.09 $ 312.64 242.12

38.53 _______ 13.80--10.65 --- -----

4.001 $ 2,796.97 $ 1,012.49 _

7.10' 2,:307.28

843.99 ----

----- 1,498.40

635.56---- ---

53.281 _________ $ 21,589.45 $

21.60

700.00 15,295.95

186.73,______

54,638.16

45,028.18 31,308.45 75,256.03

TOTALS_____ --- ~~-$--~-;-;:2.98-_-_-=-$-- 11.10 ~~~~~~~-~-;~;;-;--;- 700.00 -~-;;1,523.56 -;~~~;;

_ _ _ _ _ _ _ _ __.,=__- __-_-_.__ = = = = - - - - - - - = = = = =~~=-----=========,-===

SURVEY PLANS BY DIVISION UNITS

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENERAL MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 10-D.

Personal Services

Equipment Expenses

Furnishing Communi- Heat.Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing, Binding, Publicity
Etc.

Payments to Contractors

Special and Mlscellaneous Expenses

Total Expenditures

MAINTENANCE SUPERVISION BY CONGRESSIONAL DISTRICTS

"'00 District No. L .... 2. . . . . 3 4. . . . . 5. 6. 7----8 9.. 10. . . . . 11... 12..
TOTALS.

3,123.61 $

6.99

3,439.10 ------------

3,136.56

12.80

2,693.87

9.53

765.42 ------------

2,914.77

10.21

2,865.01 ------------

3,365.93

1.07

4,150.79

4.00

2,914.08

18.27

4,992.84

9.40

3,951.19

11.13

454.41 470.84 459.80 395.70 90.62 455.53 339.30 402.75 507.89 439.61 738.58 582.70

38,313.17

83.40 $5,337.73

4.67

62.05

4.60

151.20

2.81

92.50

.66

.35

1.53 ------------

.80

. 37

5. 79 ------------

6.26

.05

8.44 ------------

.52

.40

8.14

220.68

1.58

51.90

1,257.80 1,422.15 1,279.95 1,094.07
354.07 1,185.20 1,366.48 1,577.26 1,977.10 1,177.41 2,066.48 1,583.28

45.80

s 579.50! 16,351.25

219.52 105.25 132.80 155.40 47.27 193.26 134.82 117.20 134.83 182.02 173.25 213.96
1,809.58

"T22.661---------- --------------------------22.99 --------- -------------19.32 ---------- -------------6.10 ---------- -------------21.20 .......... -------------22.90 ---------- -------------26.75 ---------- -------------33.15 $ 8.58 -------------21.19 ---------- --------------
35.70 13.27 -------------27.71 ---------- --------------
285.001 $ 21.85 --------------

5.28 10.67 7.58
. 27 1.64
.34 5. 72 2. 62 26.62
.23 19 15 3.43

5,156. 99 5,629.14 5,147.79 4,369.17 1,276.65 4,781.68 4, 740.02 5,499.89 6,851.40 4,753.73 8,277.49 6,426.88

83 551 $ 62,910.83

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10..0-Cont"ll.

ANALYSIS OF GENERAL MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1934 TO JUNE 30, 1935

~-

-

Personal Services

Equipment Expenses

IFurnishing]
Communi- Heat,Light.
I cation Power and
Services Water

Rents

Traveling Expenses

Supplies and
Materia is

Insurance

Printing, Binding, Publicity
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

1

MAINTENANCE DIRECT BY CONGRESSIONAL DISTRICTS

ffi District No. L___
2_____ 3_____
~:::::4_____

J 49,950.251 $30,937
45,914.74 34,755.881 44,816.59 34,664.13 39,257.50 21,065.47
:u~u~ !tm ~il

122451 199 69 152.781 8193
:!~!:

14.72 52.38 48.98 50.62
1~~ H

117 50I 244.00 156.21 46.00
HH~

507~30! $ 8,010 441 $1,156 97'.----------1--------------~~------------1 S 90,817.07

630.901 450.62

7,092.55' 4,531011

1,234 911 __________ --------------
1,083.09' $ 5.84~--------------

-----------$ 75.001

90,125.05 85,984.25

168.49 2,446.281 905.11

5.25--------------------------

64,026.65

~!! ~:1 dH ~:r 1~~! H:::::::::::::::::::::::::::::::::::: H:m ~~

8_____

52,857.63 38,019.86 184.07

98~93

422.25

416.01 5,338.77 1,048.92------------------------------------

98,386~44

9----10-----

62,181.39 42,921.12

46,957.58
31,475~39

25194 83.41

131 61 42 10

795 74 395 5o

556 73 241 52

8,768 64 1,293 911------------------------

4 38

9,7G3 4:3 1,006 oo __________ ______________ ____________

120,941.92 85,928.47

1L___ 12.____

72,920.67 48,806.16 60,388.17 51,349.61

291.40 118 62

175

135.14~--467

00 1,067 00-- 482

16 12,164 80_2~165

121 1,785 201-~342

36271-1--------~--:-~----------------------------

-----------3 50

137,328.75 --1~~9 64

82~88 TOTALS_________ $
=

563,453.45
-__: "- -------=

$415,830.22 ==

$1,832 641 $ 931 16 $ 3,585.36 $ 5,219.26 =.=====--=-:-= c=:::-=-=.-::;==------=-=-----'

=-=::___----= -

::$--=9:::4-.,-9_-8--5-=-:3-:2.=1,=$-1---2-:,:-9--9--9-:-4=3-=1-=$-=--:-2:-3=.--4=6

;

-

-

-

-

-

-

-

-

-

-

-

-

-

-

1

$ =

$1,098,943.18
= =.= =::::....-==

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENERAL MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 10-D-Cont'd.

Personal Services

Equipment Expenses

I Furnishing
Communi-~ Heat,Light, cation Power and
Services Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing, Binding, Publicity
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

_,

MAINTENANCE SUPERVISION BY DIVISION UNITS

0

Division No.!_____ 2_____ 3_____

13,105 73 13,311 48 11,895 96

10 401 $1,849 38 $ 21 80 $ 577.50 $ 5,420 341 $

69 001 2,069 96----------

2.00 5,269 061

4 001 1,418 39

24 00------------ 5,661.851

461.06 898.91 449.61

95.00 $ 13.271______________

95.00---------- --------------

95.00

8.58 --------------

45.04 1.07
37.44

21,599.52 21,716.48 19,594.83

TOTALS---------~~~:~.~~~~~~~~~~~~==~:~~~=~~~

MAINTENANCE DIRECT BY DIVISION UNITS

Division No. l _____
161-- ----- -1--------- ----------- --- 2_____

$

191,115.20 195 '614 .43

$135,418.64 143,129 09

$

762.57 371.15

$

222.18 331.84

$

590.21 1,084.00

$

2,698.78 945.10

$ 27,064 071 $4,724 45,324 40 4,561 10

$

23 46 ---- --------- $

_____ 3 _____

176,723.82 137,282.49

698.92

377.14

1,911.15 _

1,575.38
____

_ _2_2._5_96-85

3, 714 11 =__:_~]------------

$ 362,595.81 78 50 391,463.07
4__3_8 __3_4_4_,8_84_._30

--------

1

1

TOTALS __________ $ 563,453.45 $415,830.22 $1,832 64 $ 931.161 $ 3,585.36 $ 5,219.26 $ 94,985 ~211$12,999 43 $ 23 461 --------- $

82 88 $1,098,943.18

I

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 1G-E.

ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

Personal

JULY 1, 1934 TO JUNE 30, 1935

Equipment

I IFurn~.s.hmg,
Communi- Heat,light,!

Rents

Traveling

Supplies and

. . .~I Printing, Binding,

Payments to

Services

Expenses

I cation Power and Services Water I

Expenses Materials

Publicity Contractors Etc.

Special and Miscellaneous Expenses

Total Expenditures

RECONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS

i . ~ . ~ ~ Dis~rictNo.

1

1

1 1 .



8_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------

g_____ -------------- ----------

"----- IQ_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- -------- - -------------- $

16.72 $

16.72

-------------- ------------ ---------- -- ------- ------- ---- ------------ ------------ ---------- ---------- ------------ - ------------ --------------

--------------1------------ __________ _ _ _ _ _ _ -------------------I- ------------1 12_____ -------------- ------------ ---------- ---------- ---------- --~------------ ------------ ---------- ---------- -------------- ------------ --------------

TOTALS _________

==~~==~~---------

$ 16.72 $

16.72

Schedule No. 10-E-Cont'd, STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935

Personal Services

Equipment Expenses

I Furnishing
Communi-~ Heat,Light, cation Power and
Services Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing, Binding, Publicity
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

RECONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS

;::3 District No. !_____ $ 829.91 $ 285.31 ---------- ---------- ------------ $ 8.50 $ 159.14

------- $ 1,282.86

2_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------

3 _____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------

4_ ____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------

5_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------

6_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------

7_____

168.20

35.16 ---------- ---------- $ 40.00 ------------ 81.21 ---------- ---------- -------------- ------------

324.57

8_____

701.65Cr. 87.50Cr. ---------- ---------- ------------ ------------ 2,257.95Cr. ---------- ---------- -------------- _____ _

3,047 .IOCr.

9_____ 3,332.53

903.97 ---------- ---------- ------------ ------------ 3,093.41 ---------- ---------- -------------- ------------ 7' 329.91

10_____ -------------- -- --------- ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------

11_ ____ ----------------------------------------------------------------------------------------------------------------------- ----------------------

12_____ 1,621.61

297.89 ---------- ---------- ------------ ------------ 6,391.25 ---------- ---------- ------------- $

1.50 8,312.25

TOTALS __________ $ 5,250.60 $1,434.83 ---------- ---------- $ 40.00

8.50 $7,467.06 ~==i--------------1 $ 1.50 $14,202.49

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1934 TO JUNE 30, 1935

Sollodule No. 111-E-Confd.

Personal Services

Equipment Expenses

Furnishing Communi- Heat,Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing Binding, Publicity
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

RECONSTRUCTION SUPERVISION BY DIVISION UNITS

~ Division No. l _____ -------------- ------------ ---------- ---------- ------------ ------------ ------------

2 _____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ---------- -------------- ------------ --------------

3_____ -------------- ------------ ---------- ---------- ------------ ------------ ------------ ---------- ------------------------ $ 16.72 $

16.72

TOTALS__________ ===~~====!---------- ------------1------------1------------ ---------- = = ---- -----1 16.72

16.72

1

RECONSTRUCTION DIRECT BY DIVISION UNITS

Division No.!_ ___ _ 2 ____ _ 3 ____ _
TOTALS _________ _

1,458.86 992.66
2,799.08
5,250.60

297.89 ---------- ---------- ------------ ------------

285.31 ---------- ---------- ------------ $

8.50

851.63 ---------- ---

$ 40.00 ------------

1,434.83

40.001 $

8.50

4,077.38 ---------- ---------- -------------- ------------

2,473.01 ---------- ---------- -------------- $

1.50

916.67 ---------- ---------- -------------- ------------

5,834.13 3,760.98 4,607.38

7,467.06:----------1== = = = -;--~~ -;-14,202.49

'

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 11

OBJECT OF EXPENDITURE

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

;~--~.--~--- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

General I Research

Administra-

and

tion

Analysis

Collection of
Revenue

Quarry Construction

Surveys

Maintenance and Recon-
struction

Shop

Land, Buildings
and Equipment

Legislative Transfers

Total Expenditures

PERSONAL SERVICES

G. 0. Administration

Administrative ____ _ $ 36,841.63 ------------ ---Others. ____________ _ 180,629.41 ------------ ------------

Field Office

Administration

Administrative ____ __ Others .. ___________ _

9,900.00------------ ---------5,187.50----------------------

Research and Analysis

Administrative _______ ---------- __ $ 3,022.58------------ ----------

Others _______________ _

15,203.09 ------------ ---------- -------------- ------------ -------------- ------------ ------------ ------------

G. 0. Shop

Administrative.______ ___

------------ ------------ ---------- -------------- ------------ -------------- $ 2,400.00 ------------ ------------

Others ______________ -------------------------------------------------------------------------------------- 7,027.94------------ ------------

Su~:;:!st\~~op::v-:s~~~~~:_t_ ~9-:-.~0- -__-_-_- :_-_- -- _-_ ---- :__--__--_:-_ _::_-__----- :_-_-_- :_- :::_--_ :: ----:;--, 0

:_--__--_ ::--------: -------------- 54,075 92 ------------ ------- ____ _ 23,694.87------------ ------------ ------------

Others. ------------------------ ------------ ------------ __________

16,977.53------------

14,618.30------------ ------------ ------------

Direct Costs

Survey Parties _______ ------------------------------------------------------------ $ 46,419.87-------------- ------------ ------------ -----------Maintenance

Patrolmen _________ ------------------------ ------------ ---------- -------------- ------------ 152,229.93 ------------ ------------ ------------

:16,841. ti:l 180,629.41
9,900.00 5,187.50
3,022.58 15.203.09
2,400.00 7,027.94 54,075.92
334,590.87 31,595.83
46,419.87
152,229.93

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. llCont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF

Land,

EXPENDITURE

General Research Collection

Maintenance

Buildings

Administra-

and

of

Quarry Construction Surveys and Recon-

Shop

and

Legislative

Total

tion

Analysis Revenue

struction

Equipment Transfers Expenditures

-----------------1---- -----1------1-----1-----1---- --------- 1-----

Direct Costs

~

Constr. and Recon~

struction Foremen __ ------------ ------------ ------------ ----------

67,870.72 .......... ..

Equipment Operators_------------ ------------ ------------ ---------Shop Employee's

45,318.16 .......... ..

Field ............. ------------ ........................ ----------

11,934.24

Sign Employee's .................................................................. ------------

Other Skilled Labor.................................................

63,071.44 .......... ..

Common Labor.................................................... 127,092.20 ........... .

1,236.84 ------------ ------------ -----------57,829.63 ------------ ------------ ------------
25,554.61 ------------ ------------ -----------6,388.92 ------------ ------------ -----------12,337.90 ------------ ------------ -----------313,126.22 ------------ ------------ ------------

69,107.56 103,147.79
37,488.85 6,388. 92 75,409.34 440,218.42

Quarry
Direct Quarry........ ------------------------ ------------ $1,043.50 -------------- ------------ -------------- ------------ ............ -----------Enfor>"e. of Revenue Laws ........................ $ 20,209.54 .......... -------------- ------------ -------------- ------------ ------------ -----------Professional Fees......... $ 420.32 .................................. -------------- $ 2,597.00 -------------- ------------ ------------ ------------

160.29~ TOTALS ................ $232,978.86 $ 18,225 57 $ 20,209.54 $1,043 501 $ 643,

$ 49,016.87 $ 607,017.22 $ 63,503.86 ------------ ------------

1,043.50 20,209.54 3,017.32
$1,635,155.81

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 11-Cont'd.

OBJECT OF EXPENDITURE

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

-------------- --------,----------,----

General Administra-
tion

Research and
Analysis

Collection of
Revenue

Quarry

Construction

Surveys

Maintenance and Recon-
struction

Shop

Land,

Buildings

and

Legislative

Equipment 1 Transfers

Total Expenditures

EQUIPMENT EXPENSES

Automobile Maintenance

Tires and Tubes ___________ _

I ____ _

482.63

116.80

301.68

2. 64 ------------ ------------

903.75

Accessories, Parts

and Repairs________ ------------ $ Greasing, \'lashing,

10.87 ------------ ----------

1,818.32

514.12

74.95

5. 70 ------------ ------------

2,423.96

Storage, etc ________ ------------ ------------ __ _

180.19

44.80

34.84

. 25 ------------ ------------

260.08

Road Equipment

Expenses Gas and OiL_ _______ _
Tires and Tubes _____ _

146.35 29.14

:::::::::: 2!~ :~~::::::::::::

126,335.49 15' 486.14

16.66 42.37

205,651.83 8,141.55

123.13 ------------ -----------18 35 ------------ ------------

332,491.86 23,749.79

Accessories, Parts

and Repairs________

164.57

Miscellaneous Charges------------

500.67 ------------ ---------.85 ------

151,378.95 561.68

53.41 4.88

200,453.73

84.66 ------------ ------------

1,228.80 ------------ ------------ ------------

352,635.99 1 '796. 21

Repairs to Office

EquipmenL------Repairs to Engineering

987.53

45.00 ------------ ----------

33.50 ------------

89.05 ------------ ------------ ------------

1,155.08

Equipment ________ ----------------------------------------------

1,017 13

128.81 -------------- ------------ ------------ ------------

1,145.94

Repairs to Machinery

Equipment_ _______ -----------Repairs and Upkeep,

289.44 ------------ $ 13.61

99.56 ------------ -------------- 5, 794.70 ------------ ------------

6,197.31

Land and Buildings

764. 80

.55------------ ----------

54.88 ------------

1,339.38 ------------ ------------ ------------

2, !59 .61

Transportation of

3 3 T:::::~~~--~~~~~~~

_-~-----~ -~--~--;

-,--1-,1-::

::

-::-:-:-::-:-:-::-:-:

_-~-

-

_-. :-~--6--:

-,--30-:-~~35-2-:-:1--,---_-_-_~--~-:~-~-~

_- 3 41

59 01

--41_7_.-- :-.--:-- -,-:-_- -:-.--:- _--_--_--_--_--_-_--:-_--_-_--_--fl

-

-

-

-

-

-

-

-

~-

-

_-

_-

_-

/-,-,--:-~-:9-3-_~4-8

34 5

62 3

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 1\-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

1----1------------------,----1----------

OBJECT OF

Land,

EXPENDITURE

General

Research Collection

Maintenance

Buildings

Administra-

and

of

Quarry Construction

Surveys

and Recon-

Shop

and

Legislative

Total

tion

Analysis

Revenue

struction

Equipment Transfers Expenditures

--------------l-----l-------l-----1--------------------- -------

EQUIPMENT

PURCHASES

Trucks ________________ ------------------------------------------------------------------------------------

5,066.80 ___________ _

5,066.80

Road Machinery, Misc.. --------------------------------- __________ ----------------------- -------------- ____________ 9,070.03 ___ _

9,070 03

Office Equipment_ ______ ------------ ---------- ------------ --------- ------------- ----------- ------------ ------------ 1, 775.77 ___________ _

1, 775.77

Engineering Equipment_ ---------- ---------- ---------- --------- -------------- ----------- ------------ ------------ 2,040.12 ------------

2,040.12

Shop Equipment _______ ------------ ------------ ------------ __________ -------------- ------------ ------------- ------------

592.29 ------------

592.29

~:~~~~~:~~:::::::::::: ~:::::::::: :::::::::::: ::::::::::~ :::::::::: ::::::~:::::: :::::::::::: ::::::::::::::1:::::::::::: ~----;;ii-iiii ~~~~~~ 150.00

I TOTALS ____________ -------------------------------------------------------------------------------------------------- $ 18,695.01 ____________ $ 1----1-------------------------------------
COMMUNICATION SERVICES

Telephone and Telegraph $ 8,313.02 $

8.39

22 56 $

40

1,256.60 $ 19.42 $ 4,515.50 $ 884.20 ------------ ------------

Postage _________________7_,_22_1_.3_2 _--_-_-_--__-_--_-____ _ _ _16_2_3_91_$_______ __ $ 1, 745.39

43.56

2,654.87

91.49 ____________ ------------

TOTALS ____________ $ 15,534.34 $

1
8 39

184 95

40 3,001.99 -$-~;-;~--;--7,170.37~~1 ~;;;~~~~~=~==

18,695.01
15,020.09 11,919.02 26,939.11

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Schedule No, 11-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF

Land,

EXPENDITURE

General

Research Collection

Maintenance

Buildings

Administra-

and

of

Quarry Construction Surveys and Recon-

Shop

and

Legislative

Total

tion

Analysis

Revenue

struction

Equipment Transfers Expenditures

------------------- ------ --------- -------1----- ----- ---- ---- -----

HEAT, LIGHTS, POWER,

WATER AND CLEANING

SERVICES

Furnishing of Heat

825.66

6.46 ------------ ---------- -------------- ------------

8.85 ---

840.97

Furnishing of Lights. __ _ 1,731.67

861.43---------------------- $ 1,812.18------------

412.47 $ 141.72 ------------ ------------

4,95947

Furnishing of Power ___ _

37.91

3545 ------------ ----------

8.16 ------------

52.90 1,346.57 ----------- ------------

1,480.99

Furnishing of Cleaning __

360.00 ------------ ------------ ---------- ---- --------- ------------

12.00 ------------ -----------

372.00

Furnishing of \Vater-~--

637.09 ------------ ------------ ----------

1,246.36 ------------

490.74

212.15 ------------ ------------

2,586.34

1--------------------------1-----1-----------1-------1----- 1-------

TOTALS ___________ _ 3,592.33 $ 903.34 ------------ ----------

3,066.70------------

976.96 1,700.44------------------------

10,239.77

1---------------------------------------------- ----

RENTS

Rents, Road Machinery _____________ ------------------------ _________ _

62,090 90 ---

206.22 ------------ ------------ ------------

Rents, Buildings and Grounds ____________ _
Rents, Office Equipment Rents, Engineering

577.50------------ ------------ ----------

2,343.95 $ 11.10

3,997.64 $ 50.00 ------------ ------------

3,006.50 ------------ ------------ ---------- -------------- ------------ -------------- ----

62,297.12
6,980.19 3,006.50

Equipment_ __________ --------------------------------------------------------------------------------------------------------------------------

Rents, Miscellaneous....

15.00------------ ------------ ----------

78.85 ------------

1.00------------ ------------ ------------

l-----l----1----l-------------------------------

TOTALS ___________ _ 3,599.00 ------------ ------------ ----------

64,513.70 $ 11.10 $ 4,204.86 $ 50.00 ------------ ------------

94 85 72,378.66

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE

General Admlnistra-
tion

TRAVELING EXPENSES Subsistence___________ _
Transportation Gas and OiL _______ _
Mileage Allowance ___ _
Other Transportation_

4,684.65
114.85 16,208.87
296.41

Research and
Analysis

Collection of
Revenue

Quarry

Land,

Maintenance

Buildings

Construction Surveys and Recon-

Shop

and

Legislative

Total

struction

Equipment Transfers Expenditures

- - - - ~--~~-i-~~~-1-~--~- -----1-~~-1~~~-

477.22 $ 3,229.10 $ 10.50

2,247.73

2144

5,833.18

498.80-

17,002.62

230.17 ------------ ----------

2,00104 15,347.85

36.40

35.55

16.70----------

4,266.37 62,979.08
593.84

1,505.12 5,029.96
46.13

1,078.90

8 95 ------------ ------------

14,659.03 1,143.20------------ ------------

7.90 ------------ ------------ ------------

7' 204.36 117,405.43
996.53

TOTALS__________ $ 21,304.78 2,743.98 $ 18,593.65 $ 46 90

70,087.02 6,602.65

s 21,579.01 1,650.95 ------------ ------------ $ 142,608.94

- - - - - ----~-1~~~-1~~~-1-~~-1-~~~~-1-~~~-1-~~--- ----~~-1-~~-1~---

SUPPLIES AND

MATERIALS Office Supplies ________ _
Drafting and Engineering

9,776.00

s 526.73

32.00 ----------

1,082.85

160

1,863.50 $ 284.31 ------------ ------------

13,566.99

Supplies......... ___ . Photographic Supplies.. Cleaning and Toilet
Supplies.. ___ __ . ___
Laboratory Supplies

4,515.71

13.20----------------------

14,407.79 2,269.60

19.46------------------------ ------------

39.62 ------------ ------------ ---------- -------------- ------------ -------------- ------------ ------------ ------------

1,994.32

52.71 ------------ ----------

2,941.00 ------------

35.36

20.80 ------------ ------------

21,225.76 39.62
5,044.19

and Materials ________ -----------Forage and Supplies

1,503.27------------ ---------- -------------- ------------ -------------- ------------ ------------ ------------

1,503.27

for Animals.......... ----------------------------------------------

78,768.55------------ -------------- ------------ ------------ ------------

78,768.55

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 11-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF

Land,

EXPENDITURE

General Research Collection

Maintenance

Buildings

Administra-

and

of

Quarry Construction Surveys and Recon-

Shop

and

Legislative

Total

tion

Analysis Revenue

struction

Equipment Transfers Expenditures

--------]-----]---- -----------------------]---- -----]---- ]-----

SUPPLIES AND

MATERIALS-

Continued
00
0 Food Supplies__________ ----------------------------------------------

Wearing AppareL ______ ---------------------------------------------Medical Supplies _______ S 12.77----------------------------------

Camp Supplies, Misc. ___ ------------ ____________ ------------ ----------

Tools_---------------------------- ____________ ------------ ----------

Fuel Supplies__________

640.75 $

.97----------------------

Explosives _____________ ------------ ------------ ------------ ----------

95,358.48------------ -------------- ------------ ------------ ------------

18,697.78------------ -------------- ------------ ------------ ------------

2,460.21 ------------ -------------- ------------ ------------ ------------

5,134.18 $ 220.84 $

14.00------------ ------------ ------------

7,463.98------------

3,733 21 $ 972.6ti ------------------------

5,308.03------------

2,629.57 1,048.79------------ ------------

12,284.56 ------------

61.80 --

------------ ------------

95,358.48 18,697.78 2,472.98 5,369.02 12,169.85 9,628.11 12,346.36

Building Supplies and

Materials ____________ ------------ ------------ ------------ _________ _
Signs------------------ ------------ ------------ ------------ ---------Materials-Roads

2,227.81 -----------45.87 ------------

5.83 ------------ 7,843.31 ------------ ------------ ------------

2,233.64 7,889.18

and Bridges-------------------------------------------------------- 511,557.94 ------------

82,436.90------------ ____________ ------------

Materials-Shop ________ ---------------------------------------------- -------------- ------------ -------------- 155,713.06 ------------ ------------

593,994.84 155,713.06

General Supplies-

Roads and Bridges. ----------------------------------------------

22,948.52 ------------

5,619.02 .:=_:_:_:.:.:_:_:_:_:.:_:.:_:.:.:_:_:_:_:.:_:;.:_:.:_:.:_:.:_.:_:.:_: --2~567 54

TOTALS__________ $ 16,979.17 $ 2,096.88 S 32.00 ---------- 780,687.55 $ 2,492 04 104,261.96 $158,039.62------------ ------------ $1,064,589.22

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

llebldiM No. \1-cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

-------------- ---1-----------1-----,----1

OBJECT OF

Land,

EXPENDITURE

General Research Collection

Maintenance

Buildings

Administra-

and

of

Quarry Construction Surveys and Recon-

Shop

and

Legislative

tion

Analysis Revenue

struction

Equipment Transfers

---------1-----1--------------------------------1------1-----1------

INSURANCE

I

Fire lnsurance-Build-
Li~~~~t:~;~~~t~~c~~-----

------------

-----------r

---------

----------

------

-------

------------

58.40 ------------ ------------ ------------

Total Expenditures
58.40

Equipment __________ $ 326.04------------,------------ __________

2,720.47.

12' 251.30

324.30 ------------ ------------

15,622.11

Bond Premiums________ 3,240.73 $ 27.00:____________ __________

603.00 ___ _

974.73

21.00 ------------ ------------

4' 866.46

1----1------------------.- --------- ----1----1------

TOTALS ___________ _ 3,566.77

27.00 ------------ ---------

3,323.47. ---------- $ 13 '284 .43

345 30 ---------

20,546.97

-------------------------------- ----1------- ---- - - - -

PRINTING, BINDING,

PUBLICITY, ETC. Printing Maps ________ _
Stenography, Typewrit-

770.03 ------------ ------------ ---------- -------------- ------------ -------------- ------------ ------------ ------------ $

770.03

ing and Multigraphing, Job Work _______ _
Photo Printing and Developing Job Work __ _
Publication of Notices and Advertising _____ _

39.00 ------------ ------------ ---------- -------------- $ 261.61 -------------- ------------ ------------ ------------

171.40 ------------ ------------ ----------

12.45 ------------ $

45.31 $

5.35 ------------ ------------

4,853.43 ------------ ------------.---------- -------------- ------------ -------------- ----

300.61 234.51 4,853.43

------------1----------1 TOTALS_._______ _ 5,833.86------------

$

12.45 $ 261.61 $

45.31 $

5.35 ------------ ------------

6,158.58

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 11-Cont'd

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF

Land,

EXPENDITURE

General

Research Collection

Maintenance

Buildings

Administra-

and

of

Quarry Construction Surveys and Recon-

Shop

and

Legislative

Total

lion

Analysis

Revenue

struction

Equipment Transfers Expenditures

--------------l-----l-----l------------------1---------------- ----

INDEMNITIES

Compensation-Medical

Services Claims and

Costs _______________ $ 10,871.48 ____________ ------------ __________ -------------- ------------ -------------- ________________________ ------------

10,871.48

Damage to Private

Property ______ ------ 8,207.06 ------------ ------------ ---------- -------------- ------------ -------------- ------------ ------------ -----------

8,207.06

Damage for Personal

Services ____________ _ 2,533.60 ------------ ------------ ---------- -------------- ------------ -------------- ------------ ------------ ------------

2,533.60

-----1----1------ ----1----------------------1---- -----

TOTALS __________ $ 21,612.14 ------------ ------------ __________ -------------- ------------ -------------- ________________________ ------------

21,612.14

l----l----l----1----l-----l----l-----l----1------ ----- ----

PAYMENTS TO

CONTRACTORS

Payments to Contractors------------------------------------ __________ $9,470,838.02 $ 700.00 ----

$9,471,538.02

------------1-----1------------11----1----- --------------- ----

SPECIAL AND

MISCELLANEOUS

EXPENSES

Miscellaneous Camp

~:~~~;~~~~:~~~::~~~~: :~::::~~~:~~ :i::;:;~i:;~ ~~~=~~=~~-~= ==:~~~~~-~~~~~~~~;;;;~~~~~-:_:_8:~-:~_fJ_:~_:_:_:_:_:_:_:;_:; :,:::::;L~~~~~~~~~:~:r~~~-~~~~0:,

3,444.54 88,342.87 33,336.74

552.30

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

............ ..,,~

OBJECT OF EXPENDITURE

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

------~-----~-----~----[------,------ ---------~

Land,

General

Research Collection

Maintenance

Buildings

Administra-

and

of

Quarry Construction Surveys and Recon-

Shop

and

Legislative

tion

Analysis

Revenue

struction

Equipment Transfers

- - - - - , - - - - - - I - - - - --~----

-----~--

- - - - - - - - - - - - - ~-----

-----~

Total Expenditures

SPECIAL AND

00

MISCELLANEOUS

"" EXPENSES-Cont'd. Incidentals ____________ _

641.48 $

.80------------ $ 52.69 $

259.93

50.00 $

80.50

7.20 ------------ ------------

1' 001.60

Interest _______________ ------------ ------------ __ ---------- ---------- -------

Transfers

Convict Farm ________ ------------ ___________ ------------ ---------- -------------- ------------ _ ---------- ___________ ------------

546.93

546.93

~:~~~~:"-' ,,;:~ ,:=::: ,~~::60,059.69
~~:~:: 7,;~~,~~-i;,;;ch;,~; =~:~~-~: ~--::::-.--:_::r~,-::-__-:r:-::::::- : _:_: :---: 8;:;~~-~~ ::::::::::::: ~::::::::-:: ::::::~::::,:::::::::::: ~-8-~_:~-~-~--~-;

TOTALS ____________ $ 1,880.78 $ 1,958.201! ____________ $ 52.69 $ 37,568.29 $179,861 88 $

184 h5 $ 37 65 _ _______ ,$2,060,606.62 $2,282,150.84

- - - -----~-

- - - - - -~----

----~~

-----------

I
-~-,-~--~,---

- - - - - - - I -~----

TOTALR ___________ $328,974 42 $ 27,074.82 $ 39,020 14 $ 1,157 10 $11,380,060 33$ 239,930 98 $ 1,176,073.22 $ 233,9334? !8,695.01 1$2,060,606.62 $15,505,526.13

1

1

1

1

1

1

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 11.-Cont'd

OBJECT OF EXPENDITURE

_____ ____ _______ ADMINISTRATION

------

,

,

CONSTRUCTION

MAINTENANCE

- - - - - - ~---~- -~--- --~~-

General Administra-
tion

Research and
Analysis

Collection of
Revenue

Quarry

Construction

Surveys

Maintenance and
Reconstruction

Shop

Land, Buildings and Equipment

Legislative Transfers

Total Expenditures

LESS: INTER-DEPART-

MENTAL BILLINGS

Blue Prints

G. 0. Salaries. _______ $ 77,388.57------------ ------------ ---------- -------------------------- -------------------------- ------------ ------------

~~::::. ~. t : : : -. :"'" ="- - - : G. 0. Supplies_______ 11,876.77 ------------ ------------ ----------~-------------- ------------ -------------- ------------ ------------ ------------
Shop

- - - -3 "" .,,

:

77,388.57 11,876.77
:::: :

"':;::::,~;,;;1~~~::~~.~~~~~~~"-"~1~~1~'"-~:~~~::.~g:~

Schedule No.12.

STATE HIGHWAY BOARD OF GEORGIA

OONSTRUCTION ALLOTMENTS AND EXPENDITURES BY TYPES JULY 1, 1934 TO JUNE 30, 1935

-
Description

July 1,1934 To
Dec. 31, 1934

Jan.1,1935 To
June 30,1935

Total For Year

ALLOTMENTS

Graded Earth and I

I

SoiL ______ -- _- --- - - $ 771 ,290. 27 $ 571,485.53 $ 1,342,775.80

GraveL _________ - __ -- 1, 207,233.68 1,146,236.85

2,353,470.53

Macadam ____ -_--_--- 122,339.34

94,840.99

217' 180.33

surface Treatment__ 1,269,543.21 1,220,577.13

2,490,120.34

Bituminous Mixtures 210,896.88

4,375.13

215,272.01

Bituminous Concrete 90,600.28

324,176.11

414,776.39

cement Concrete ____ 1,130,162.20 Brick ___________ - ___ - 43, 687. 22

1,265,402.04

2,395,564.24

990.50Cr.

42,696.72

Structures__________ - 1, 099, 193. 68

729,864.09

1,829,057.77

--------

Totals _____ - - -- - - $5,944,946.76 $5,355,967.37 $11,300,914.13

I

EXPENDITURES

Graded Earth and SoiL _______________ $ 900,462.36
GraveL ______________ 1,043,388.99 Macadam ____________ 105,464.05 Surface Treatment__ 2,071,058.11 Bituminous Mixtures 331,250.00 Bituminous Concrete 167,750.73 Cement Concrete ____ 1,357,285.27 Brick ________________ 18,191.34 Structures___________ 289,863.66
Totals ___________ $6,284,714.51

$ 960,577.21 1'024, 393.46 53,494.79 1,303,632.04 72,868.72 103,926.01 1,117,599.98 37,734.32 421,119.29
$5,095,345.82

$ 1,861,039.57 2,067,782.45 158,958.84 3,374,690.15 404,118.72 271,676.74 2,474,885.25 55,925.66 710,982.95
1$11,380,060.33

85

STATE HIGHWAY BOARD~OF GEORGIA CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 13

DESCRIPTION

Personal Services

Equipment Expenses

Communi- Furnishing cation Heat, Light, Services Power and Water

Rents

Traveling Expenses

EXPENDITURES

Supplies and
Materials

Insurance

Printing, Binding, Publicity
Etc.

Payments to
Contractors

Special and Miscellaneous Expenses

Total

SUPERVISION

CONTRACTS State Aid. ________ _ Federal Aid _______ _ National Recovery_
TOTALS _______ _

78,579.64 3,464.65 215,647.54
297,691.83

845.46 240.42 2,593.81

229.32 ---
6.48 ----------
860.88 ----------

3,679.69 $1 '096. 68 ----------

145.50 $ 19,427.33

10.00

592 37

163.89 37,813.44

3,586.66 ---------- ---------- ------------ $ 7,879.33

93.60 ---------- ---------- ------------

121.50

9,307.36 ---------- ---------- ------------ 20,056.24

---

319 39 $57,833.14 $ 12,987.62 --

---------- ------------ $ 28,057.07

110,693.24 4,529.02
286,443.16
401' 665.42

STATE FORCES Convict Forces ____ _

17,835.58

223.95

1~ 04 ----------

5.00 3, 998.94 546.20 s 3 oo~-$--9-I~~~~=~---=:--::;:

Asphalt Forces____ _

4,792.99

3.56

16.98 ----------

5 00 1,930.63

160.26

15 00

----------- 1,060 40

7,984.82

Paving Forces _____ _

5,424.82

1.50

8. 70 ----------

29 15

833.35

310.61 ---------- ---------- ------------

821.11

7,429.24

Division Forces_. __

2,128.31

42.95

9.29 ---------- ------------

648.03

82.32 ---------- ---------- ------------

257 94

3,168.84

1~----l------------------------------------l---------

TOTALS _______ _

30,181.70

271.96 ~=== s 39.15 s 7,410.95 s 1,099.39 s 18.oo_s_~~------------ 3,251.60

42,335.91

Total Supervision

327,873.53

3,95L65 $1,150 69 ~~~:..:.:..:.~~~= 35~~_s_ 65,244 09 $ 1~087 01~~~_18 00;~ 9 15;=-~~c-=--=-=--=-=--=-J=$=3=1,=3=08=.=67J==4=44=,0=0=1=.33

1

1

STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT
JULY 1, 1934 TO JUNE 30, 1935

Sol\edule tto. \3-Cont'll.

DESCRIPTION

Personal Services

Equipment Expenses

Communi- Furnishing cation Heat,Light, Services Power and Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing, Binding, Publicity,
Etc.

Payments to
Contractors

Special and Miscel laneous Expenses

Total

DIRECT

CONTRACTS

State Aid

Contractors ............................... ---------- __________ ----------- ---------- ---------- ---------- --------- $1,417,330.69 ----------- 51,417,330.69

Counties _________ ---------------------------------------------------------------------------_

______________ 1,605,003.96 ------------ 1,605,003.96

Federal Aid........ ----------------------------------- ---------- -------- ------------ ------------ -------- __________ 41!,609.42 ------------

42,609.42

National Recovery_ $ 23,819.24 $ 1,999.47 $ 30.82 $ 46.03 $ 8,544.71 $ 574.30 $ 9,916.96 $ 57.00 ---------- 6,405,893.95 $ 121.95 6,451,004.43

1-----1-----1---------------------------------- ----- -----

TOTALS ______ __

23,819.24 1,999.47

30.82 $ 46 031 s 8,544.71 $ 574.30 $ 9,916.96 $ 57 00 -------- $9,470,838.02 $ 121.95 $9,515,948.50

-----------------------------1-----1------ ----

STATE FORCES

Convict Forces.____ Asphalt Forces_____

113,462.02 $172,953.70 $1,573.651 $2,891.76

87,084.48 63,019.50 169 13

92.06

734 90 645 83

1,580.08 $354,635.88 $1,992.42 __________ ________ 2,160.05 170,437.16 1,256.05 __________ ------------

5,951.15 22.53

655,775 56 324,886.79

Paving Forces......

43,332.03 24,394.44

77.70

2 05 53,959.69

448.50 174,865.70 ____________________ ---------

78.55 297,158.66

Division Forces.. __ _ _4_7_._58_8_.9_9 __3_7_,4_8_20_9. _._.___________3_4_._80 ___2_7o_._o3_ _ _ _8_o_.o_o_ __5_6_.7_4_4_8._41 ________ .. $ 3. 30 .:_:_:_:==-:_: _ _ _85_._44_ __1_4_2_2,_89_._4_9

1

1

1

1

1

1

TOTALS________ 291,467.52 $297,849.73 $1,820.48 $3,020.67 $55,610.45 4,268.63 $756,683.58 $3,248.47 $ 3.30 ____________ 6,137.67 $1,420,110.50

1-----1-----------------------1---------------------1------

Total Direct_._. __ . __ 315,286.76 $299,849.20: $1,851.30 $3,066.70 $ 64,155.161 $ 4,842.93 $766,600 54! $3,305.47 $ 3 30,$9,470,838.02 $ 6,259.62$10,936,059.00
Total Expenditures_.. 643,160 29~~~~ S3 .oo1.9=[~:~o~-~ -~ 64,~~~~~=;o~~:~ ~~o~~~~~-~3~~~~~ ; -~;=:ls9,470,838.o; ; ~~~~;g~~~;;~o;o=~

STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT
JULY 1, 1934 TO JUNE 30, 1935

Schedule No. 13-Cont'd.

ALLOTMENTS

New

Contracts

Revisions

Total

---------------1--------1-----------------

Contracts

State Aid

Contractors ___________ $ 1,455,402.94 $ 96,289.90Cr. $ 1,359,113.04

00

Counties __ ------------ 2,031,885.59 179, 149. 82Cr. 1,852, 735.77

00

Federal Aid _____ --------

87,156.94

29,539.5!Cr.

57,617.4:3

Nat'! Recovery---------- 6,488,852.13 107, 103. 67Cr. 6,381,748 46

---------------1------

Totals ______________ $ 10,063,297.60 $ 412,082.90Cr. $ 9,651,214.70

ALLOTMENTS

New Contracts

Revisions

Total

State Forces Convict Forces ___________ $
Asphalt Forces __________ _ Paving Forces __________ _ Division Forces ________ _

547,946.88 $ 242,150.96 $

389' 884.97

56,531.37

331,084.66

26,496. 76Cr.

95,878.70

12,718.65

790,097.84 446,416.34 304,587.90 108,597.35

-------------1------

Totals ______________ $ 1,364,795.21 $ 284,904.22 $ 1,649,699.43

====,==!===== ------

TotaL\llotments _________ $ 11,428,092.811$ 127,178.68Cr.l$ 11,300,914.13

Schedule No. 14 STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS
BY COMMISSIONERS DISTRICTS JUNE 30, 1935

District

Amount

CONSTRUCTION Beginning of Department to June 30, 1933

District No.1, Southern ......... ------ --- $45,099,763.46

2, Central_ _________ _

- ............... .. 39,788' 179.25

3, Northern .................. . --- ----- 43,408,665.46

TotaL .............

----- $128,296,608.17

CONSTRUCTION Beginning of Department to June 30, 1935 District ~o. I, Southern ... ---------- $ 51,363,832.46 2, CentraL ......................................................... . 48' 104' 623.46 3, Northern _________________________________________________________ _ 5!,441,875.74
TotaL ......................... __ -- ............. _- ................. $150,910,331.66

CONSTRUCTION July 1, 1933 to June 30, 1935
District No.1, Southern ... ----- 2, CentraL ......................................................... 3, Northern ..........................................................

6,264,069.00 8,316,444.21 8,033,210.28

TotaL ............................................................ $ 22,613,723.49

CONSTRUCTION July 1,1934 to June 30, 1935 CONSTRUCTION-REGULAR District No.1, Southern .......................................................... $ 1,558,550.87 2, CentraL.......................................................... 1, 996,858.80 3, Northern.......................................................... 1,363,756.00
TotaL .............................................................. I 4,919,165.67

CONSTRUCTION-NATIONAL RECOVERY
District No. 1, Southern ______________ -------------------------------------------2, CentraL ......................................................... . 3, Northern ...................... .

1, 738,042.34 1,648,227.57 2,995,478.55

TotaL- - $ 6,381. 748.46

CONSTRUCTION-TOTAL District No.!, Southern ...................................................... $ 3,296,593.21
2, CentraL ..... ---------------------_____ 3,645,086.37 3, Northern ..... --------------------------------------------....... 4,359,234.55
TotaL.---------------- .. -------------- ..... --------- ...... $ 11,300,914.13
89

Schedule No. 15 STATE HIGHWAY BOARD OF GEORGIA
SUMMARY~~ ~g~~'itLE~S~~~'i~ug~~l~~lT~LOTMENTS,
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS 1 JUNE 30,1935

District

I
Distr. of Totalt

of Allotments:

I On Mileage ,

1 Basis

I

------

Funds as Actually Allotted

I,Excess Allot.I,Allot. under

Over

Mil-

1
1

Mileage

eage Basis Basis Dis-

Distr.

tribution

CONSTRUCTION

Beginning of Department to June 30,1933

I

I

I

District No.1 10,871 '306. 71 1$ 10,892,038.56$ 20,731.851 -

-

2 10, 742,890.83,' 11' 146,744.961 403.854.131.---

--

3 11,046,651.48, 7,935,376.54.- - -- -$3,111,274.94

4 9,309 ,850. 36 9,964,556.45 654,706.09 -----

5 2,334,163.3'3) 2,544,008.54 209,845.16------- ---

6 9,998,505.621 8,786,047.16---------- -- 1,212,458.46

7 10,153,010.86, 11,403,607.38 1,250,596.52.---

8 11 '358' 051.59 9 '000' 583.50 -- -- ---. 2' 357 '468. 09

9 13,510,537.71 17,887,880.501 4,377,342. 79-------- ----

10 9,824,491.57 8,626,887. 711_-.----- --.11,197,603.86

11 16,454,516.59 18,925,685.12 2,471,168.53... -- ----- ----

12 12,692,631.471 11,183,191.75---- ----- -- 1 ,509,439. 72

+------ 1-- - - - - - ------ --~----------

----~--------

Totals __ l$128,296,608.17j$128,296, 608.171_-- ------

CONSTRUCTION Beginning of Department to June 30,1935

District No.1
2
3 4 5 6
7 8 9 10 ll 12

12,721,304.82,I$ 12,674,163.77--- - -- - ---_I$ 47,141.05

12' 798,879.871 12' 387' 906.15

_I 410, 973. 72

12,881,320.02[ 9,370,042.01-

- -1 3,511,278.01

10,870,926.96, 11,594,389.88$ 723,462.921 ______ -- -

2' 790' 958.171 3, 636' 306.521 845' 348. 351_ -----------11,698,616.88, 11,413,283.04-- - - ----- 285,333.84

ll '871, 700.651 13' 692' 342.241 1, 820' 641.59 -------- --13,388,529.20 11,229,525.62, ..... -------- 2,159,003.58

16,006,384.19 19,952,125.781 3,945,741.59---- -- ----

11,546,326.791 9,797,580.45 ---- --- 1,748,746.34

19,378,268.32 21,102,233.10 1,723,964.78-------

14,957' 115.79 14,060,433.10------------- 896,682.69

90

Schedule No.15-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS, BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30,1936

District

Distr. of Total of Allotments
On Mileage
Basis

Funds as Actually Allotted

!Excess Allot.IAllot. under

1 Over Mil- Mileage

eage Basis Basis Dis-

Distr.

tribution

I

CONSTRUCTION

July 1, 1933 to June 30,1935

District No.1 $ 2 3 4
5 6
7 8 9
10 11 12

I
1,849,998.111$ 2,055,989.04 1,834,668.54 1,561,076.60
456,794.79 1, 700,111.26 1,718,689.79 2,030,477.61 2,495,846.48 1,721,835.22 2,923, 751.73 2,264,484.32

11,'274812,'116215.1.291, _1_-_-_-_-_--_-_-_-_-_-_-__I$

67,872.90 814,827.85

1,434,665.47 ------------- 400,003.07

1,629,833.43$ 68,756.83 -------------

1,092,297.98 635,503.19 -------------

2,627,235.88 2,288,734.86 2,228,942.12

927,124.62 -------------
570,045.07 ------------198,464.51 -------------

2,064,245.28 ------------- 431,601.20

1,170,692.74 ------------- 551,142.48

2,176,547.98 ------------- 747,203.75

2,877,241.35 612,757.03 -------------

Totals____ $ 22,613,723.49 $ 22,613,723.49 ------------- -------------

91

Schedule No.l6
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL
DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1935

District

1 Distr. of Total of Allotments
On Mileage
Basis

Funds as Actually Allotted

!Excess Allot. IAllot. under

Over Mil- Mileage
I eage Basis Basis Dis-

Distr.

tribution

I

CONSTRUCTION-REGULAR

July 1,1934 to June 30,1936

District No.1 $ 2 3 4 5 6 7 8 9 10 11 12
Totals ___ $

I
409,490.44 1$ 444,051.11 392,760.08 338,781.41 103,197.83 374,654.59 371,842.64 438,456.23 539,765.70 375,570.70 638,003.06 492,591.88
4, 919' 165.671$
I

I

494,771.47 212,245.22

$----8-5--,2-8-1--.0-3-$---2--3-1-,8--0-5-.8--9

295,016.57 ------------- 97,743.51

453,941.93 115,160.52 -------------

62,187.91 ------------- 41,009.92

506,063.24 359,801.30

131,408.65 -------------

-------------
12,041.34

463,590.15 25,133.92 -------------

441,329.92 ------------- 98,435.78

159,557.54 ------------- 216,013.16

648,002.73 9,999.67 ------------822,657.69 330,065.81 -------------

4,919,165.67 ------------- -------------

I

I

CONSTRUCTION-NATIONAL RECOVERY July 1,1934 to June 30,1936

District No.1 $ 2 3 4 5 6 7 8 9 lO ll
12

523,813.031$ 577,995.79 511,429.63 441,352.93 133,346.94 485,179.74 482,515.14 571,062.59 697,210.50 488,058.81 828,686.28 641,097.08

290,540.29 -------------$ 233,272.74 385,865.68 ------------- 192,130.11 451,439.51 ------------- 59,990.12 388,455.94 ------------- 52,896.99
782,112.26$ 648,765.32 -------------
509,394.75 24,215.01 ------------862,870.74 380,355.60 ------------328,988.59 ------------- 242,074.00 818,183.69 120,973.19 -------------
282,411.47 ------------- 205,647.34
625,999.03 ------------- 202,687.25 655,486.51 14,389.43 -------------

Totals ___ $ 6,381, 748.46$ 6,381,748.46 ------------- -------------

I

I

I

92

Schedule No.16-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF ACTUAL ALLOTMENTS, BY CONGRESSIONAL DISTRICTS

(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30,1935

-
District

Distr. of Total
of Allotments On Mileage Basis

Funds as Actually
Allotted

Excess Allot. Allot. under

Over Mil- Mileage

eage Basis Basis Dis-

Distr.

tribution

CONSTRUCTION-TOTAL

July 1,1934 to June 30,1935

District No.1 $ 2 3 4
5 6 7 8 9 10
11
12

933,303.47~$
1' 022' 046.90 904, 189.711 780,134.34
236' 544. 771 859' 834. 33j 854,357.781 1,009,518.821 1,236,976.201: 863,629.51
1,466,689.341
1' 133,688.961

785,311.761-------------$ 147,991.71 598' 110.90 ------------- 423,936.00 746,456.081------------- 157' 733.63 842' 397.87 $ 62,263.53 -------------
844' 300 .171 607' 755 .40 ------ ---- --1 '015, 457.99, 155' 623.66 ------------1,222,672.04: 368,314.26-------------
792,578.741_____________ 216,940.08 1,259,513.611 22,537.41 ____________ _
441,969.01_____________ 421,660.50
1,274,001.76[------------- 192,687.58
1' 478,144.201 344,455.24 -------------

Totals ___ .$ 11,300,914.d$ 11,300,914.131------------- ____________ _

1

' .

'

.

MAINTENANCE July 1,1934 to June 30,1935

DistrictNo.1 $ 2 3 4 5 6 7 8 9 10 11
12 -
Totals ___ $

9 6 , 3 9 6 . 1 0 1$ 105,559.451 93,386.82 80,574.04 24,431.15 88,806.37 88,240.49 104,265.42 127,759.20, 89,197.92 151,483.62: 117,090~:
1,167,190.71 1$

91,575.081-------------$ 4,821.02

98,454.33,-------------

7,105.12

95,471.37$ 2,084.55-------------

72,073.00-------------

8,501.04

18,371.99 -------------

6,059.16

87. 869 .17 - -- - ---- --- - -

937. 20

95. 472 . 45

7. 231.96 -- - ----- -- - --

102,953.87:-------------1 1,311.55

129.275.72: 90,860.1611

1, 516. 521_-----------1,662.24, ____________ _

148,512.01_____________

2,971.61

=== 136,301.561 19,211.43-------------
1,167,190.711-------------

93

Schedule No.16-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF ACTUAL ALLOTMENTS, BY CONGRESSIONAL DISTRICTS

(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1935
======================7=====================7=======--

District

Distr. of Total of Allotments
On Mileage Basis

Funds as 1 Excess Allot. Allot. under

Actually Over Mil- Mileage

Allotted eage Basis Basis Dis-

Distr.

tribution

RECONSTRUCTION July 1,1934 to June 30,1935

District No.i 1$

I

i

1,827.08$ 3,940.80 i$

1 '948. 201 1 '5.41. 80

2,113.72I ~
~~~~~I$

406.40

3 . 41 5 I

i:!~tg~;~~~~~~~~~~ ~:::~~::~~~~~~~~~~ i:Ht~

6 I

1 '651. 99 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

1'651. 99

7

1,636.35, 5,174.57

3,538.22 ~~~~~~~~~~~~-

8

1,922.49 5,243.40Cr. ~~~~~ ~~~ ~~

7,165.89

9

2,385.95, 7,295.84

4,909.89 ~~~~~ ~~~~---

10

1,650.411 ~~~~~~~~~~~~

~~~~~~~~~

1,650.41

11

2,804.991 l, 7l5.15Cr.' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

4,520.14

12

2,161.45, 10,658.06

8,496.61 ~~~~~~~~~~-~-

Totals~~~$~--2- 1,- 65- 2.5:2 - $ -21-,6- 52- .5- 2 ------~. ~~- 1~~-~~- ~~- ~~~- ~~- --

1

1

SURVEYS July 1,1934 to June 30,1935

District No.1 $ 2 3 4 5 6 7 8 9 10 11 12
Totals~--_ $

I
21 '438 .12i$ 23,280.91 20,592.481 17' 763.071 5,407.221 19,634.231 19,490.14 22,988. 76. 28,281.081 19,687.921 33,443.611 25,825.57
257,833.111$
I

14,940.651~~~~~~~~~~~~~ $ 6,497.47

6,629.54 ~~~~~~~~~~~~-

16,651.37

~i:

~~~:~~I$~--~

4~

483:99

6,255.25 -------------

38,616.96. 33,209.74 - -----------

18,156.191 ~ ~-- ~ ~ ~ ~ ~ ~ ~ ~ ~

1,478.04

32,552.81 13,062.67 -------------

13,607.21 -------------

9,381.55

22,107.74 -------------

6,173.34

13,946.09 -------------

5, 741.83

33,644.11 27,047.52

200.50 -------------
1,221.95 -------------

257,833.11,---- ~- ------ -------------

I

I

94

Schedule No.16-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL ALLOTMENTS, BY CONGRESSIONAL DISTRICTS
(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30,1935

District

IDistr. of Total of Allotments
On Mileage
I Basis

Funds as Actually Allotted

Excess Allot. Allot. under

Over Mil- Mileage

eage Basis Basis Dis-

Distr.

tribution

TOTAL ALLOTMENTS July 1,1934 to June 30,1935

District No.1 $ 2 3 4
5 6
7 8 9 10 11 12

1,052,964. 77$ 1,152,835.46
1'019' 891.52 879,956.54 266,839.15 969,926.92 963,724.76
1,138,695.49 1,395,402.43 . 974,165.76 1,654,421.56 1,278,766.11

895,768.291- ---- ---- J$ 157,196.48

704,736.57,- --------- 448,098.89

856,264.681 - --- ------ 163,626.84

936,717.931$ 56,761.39------------901,289.12 634,449.97 -------------

1,121,483.35 151,556.43-------------

1,355,871.871 392,147.11 -------------

903,896.42 ----- ------ 234,799.07

1' 418' 192 .91 22' 790 .48 - -- -- - ---- ---

546,775.26 ---

--- 427,390.50

1,454,442.731______ ---- 199,978.83

1,652,151.341 373,385.23-------------

Totals___ $ 12,747,590.47 $ 12,747,590.47, 1 ===='I

Other Allotments Undistributed:

Administration ________________________ $ 241 '774.41

Research ___________________________ .. __

298.39

Collection of Revenue___ . ___________ _ c;tuarry ____________________________ _ Shop. _______________ _

39,020.14 1,187.10 110.75

Equipment________

_ __________ _ 16,343.68

Motor Vehicle License Tags __________ _ 60,059.69

Transfer-General Fund-1935 Act ___ _ 2,000,000.00

Total Allotments, July 1,1934 to June 30, 1935-Exhibit "B"- _________ $15, 106,384.63

95

STATE HIGHWAY BOARD OF GEORGIA

ENGINEERING

STATE MILEAGE BY ENGINEERING DIVISIONS

AT JUNE 30, 1935

Div.No. No.of

I

.

Area IPopulatiOn Mileage at

Counties Sq.Miles 1930 Census 6-30-34

---- ------ ------ ------

l_ ________
2 _________

56 51

3 _________

52

22,916

846,415 3,040.165

19,561

894,135 3,028.877

16,248 __1:_._1:67,9~12,807.176

------

Totals __ 159

58,725 2,908,506 I 8,876.218

I

~
Mileage at 6-30-35
-
3,128.339 3,204.529 2,873.561
-
9,206.429
------=

STATE MILEAGE BY CONGRESSIONAL DISTRICTS AT JUNE 30, 1935

I

-~

~iCsotn.g . _

No.of Counties

Area Sq.Miles

!1P9o30pCuleantisounsM1i~le3a0g-e 3a~t ~ Milea~ ge at

1

l________

13

2________

13

3________

15

4_-------

10

5 ________

4.

6 __ ------

13

7 ________

13

8--------

13

9________

18

10 ________

12

ll_ -- - -- - -

20

12________

15

6,396 5,528

260,291 I 709.409

242,276

808.865

4,563

189,719 . 716.213

3' 777 1,140

220' 708 422,206

618.619 194.100

3, 614 4,366

221,050 262,219

672.584 671.417

4' 193 5,449 4,657

198 '927 218,496 212,934

800.055 951.898 680.954

9 '465 i 248' 290 11 ' 155 . 148

5,577 1 211,39o

896.956

773.427 812.392 743.179
671.766 196.448 702.025 684..073
799.576 995.626 710.079
1 ' 173. 655 944.183

1"9.206.429 Totals__ =~ --58,~5___1--z.g08,5()(li8,876.218

STATE MILEAGE BY COMMISSIONERS DISTRICTS AT JUNE 30, 1935

Comm.l No.of I Area

Dist. Counties Sq.Miles

-----

1_ ________

56

22,916

2_________

51

19,561

3_________

52

16,248

!Population Mileage at 11930 Census 6-30-34
------
846,415 3,040.165 894,135 3,028.877 1,167,956 2,807.176

Mileage at 6-30-35
3,128.339 3,204.529 2,873.561

Totals.. -159 -~--58,72"5"12,908,500i 8,876.218"" 9,206.429

I

I

1



96

Project No. 29- A- DBmanuel County- Concrete Paving Near Swainsboro.
Completed 1936.

Project No. 342- A- Twiggs CountyConcrete Paving North of Jeffersonville. Completed 1935.

STATE HIQ-AY -ARD OP CR.OIIQIA

SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION

DURING FISCAL YEAR ENDING JUNE 30, 1935

To~ndSoil ~, I I I Project
Number I

COUNTY

---- -----------

Chattooga ___

--_:] -~-, -~- =---=~ .: : ~-----~L::: -. -~ 17' - 2-A Rabun_______

Eng. I Cong. Div. , Dist.

Comm. Dist.

Graded Earth

Sand Clay

I C::na;el Resurface
Macadam j

Surface Bituminous Treatment Concrete

Cement \ Concrete I

Brick

Structures

17 Wilkes _____

19-B Bleckley ___

19-C Bleckley _ 21-ll Heard ______

-1

12

I

------------

1.515 .686

------- ------

~----------------------- -

29-A Emanuel __

12

""''

29-A Johnson __ 29-D EmanueL_

12 12

30-B Cobb ______

7

31-ll Dade ___ 31-D Dade _________

31-E Dade_

.022

44-A HalL

44-B HalL_

.043

47 Screven ____

.016

49 Mitchell

.022

53-B Bibb__ _____

54 Floyd __

58-A Butts _____

.094

58-A Jasper ___

.Oi2

65 Dade____

71 Catoosa __

-------1 99-A Thomas____ - ----

.008

102 Cobb ____

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION

DURING FISCAL YEAR ENDING JUNE 30, 1935

---- ::,!::, .:::.:. """""' ,: .: :~, ;~:;;::- -~-;_cr_en1_~- ::_'"_'_"~ Project I
Number

COUNTY

;:: I Eng. Cony. Comm.
Div. Dist. Dist.

- - B r i : __ _

1

106-A Sumter......... _._._.

- - - - --~=~=: 1==:~

~-::::~ ---1-.4-88- ~---------- _______________________ _

.045

109 Dawson ___________ _

-- ---------- !____________ 6.708

113 Pulaski______________ _

12

___I ___________

.187

116 Walton ____ _

8

2.861

119 Pickens _____________ _

2.139

121-B Randolph __

2.590

.004

135-B Elbert__ _____________ _

.045

..... 138-C Warren

10

.205

0 0

154-A Wayne._. ___________ _

11

1.298

154-ll wayne_

11

1.645

.087

158 Twiggs __

12

4. 737

158-B Twiggs

12

-- -----------

.035

159-A Miller._

.884

171-B Clay __ _

---

5.209

174-B Fulton __ __ 17!!-A Greene __

---

1. 787

::::::::::::1I ::::::::::

-f
I

3.832

182 .Jenkins_

2.885

184 Muscogcc

I

190-ll Murray_

4.521

.323

.023

190-C Murray_

4. 614

195 Mcintosh ____ __

. 1!15

215 Banks __ 221i-B Liberty __

_________ :I -- ----------

3.17:l 0.104 I -- -----

228-A Greene ______________ _

I 233

Clayton _____________ _

j

-:::::::::I::::::::::::I::::::::::::, .430

I

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

Top Soil

Gravel

Project

COUNTY

Eng. Cong. Comm. Graded

and

and

Resurface Surface Bituminous Cement

Brick

Structures

Number

Div. Dist. Dist.

Earth

Sand Clay Macadam

Treatment Concrete Concrete

--~-/-------~ - - - - - - - - 1 - - - - 1 - - - - 1 - - - - - - - - - - - / - - - - - - - - - - - - - - - - - - - - -

234

Camden ______________

11

11.128

236 Jenkins _________

1

241-A Hancock ______________

10

242

Polk _________________

7

246-B Clarke ________________

256-B Appling ______________

11

256-C Appling ______________

11

>-' 258-B Clayton ______________

6

.0..... 263-B Walker_______________

7

264

Early ________________

266 Dawson ______________

272-B Bibb ________________

1.376

6. 443 4.527

1.444 6.487
5.836
4.214 3.555

2. 945

.026

. 765

4.863

.027

1.147

.046

280 Clayton ______________

2.925

283

Forsyth ______________

287

Toombs ______________

12

3.379

2. 758

288-B Muscogee _____________

299-C Pulaski_ ______________

12

299-D Wilcox_ ______________

12

309-A '\\rayne_______________

11

311-A Elbert ________________

8

311-B Elbert__ ______________

3. 734

1.273

.049

3.801

3.928

3. 741

4.526

2.208

314

Wilkes _______________

.352

318 Chatham ______ -------

321

Forsyth ______________

326

Iillbun _______________

.997 7.525
.954

329

329-B

334-B

337-B

340-A

342

347-B

,_. 348-B

""0

351

351-A

353-ll

360-B

360-ll

360-D

371-B

386

394-C

394-D

403-B

403-C

I Project
Number'

COUNTY

412-E Wheclrr __

428-A Bryan

428-R Bryan __

432-ll Camden __

432-I Carndf'll_

434-A Oconee

435-R Wilkinson_

,_. 435-C Laurens_

0 c.:>

436-A Pulaski_

436-l Pulaski __

4:37-A Glascork_

437-H Glascock_

443-A Jasprr _

H:l-C .Jasper_

443-E Jones_

449-C D"Kalb

452-R JcnkinR_

452-C Bulloch

4.52-H Jrnkins

453-C Muscogcc_

41i2-A Gilmrr_

484 Hichmond_

481i-ll Tattna\L..

490-B Fulton ___

491-A Bartow_

Eng.
11 11 10 12 12 12 10 10
[)
10 1

STAT HIGHWAY IIOARD 01' QU)RGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

Graded Earth

Top Soil and
Sand Clay

Gravel and
Macadam

Resurface

Surface

I
I I
Bituminous I

Cement

Treatment Concrete \ Concrete

---1-

,------

1

\
Brick 1 Structures
_\ ___ _

-- I

.121
.028
.229 .886

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

Project Number

COUNTY

Eng. Cong. Comm. Div. Dis!. Dist.

Graded Earth

Top Soil and
Sand Clay

Gravel and
Macadam

Resurface

Surface Bituminous Treatment Concrete

Cement Concrete

Brick

Structures

491-C Gordon _________ .. ___ 495-B Randolph ____________

496-B Gwinnett _____

496-E Gwinnett -----------498-B HalL _______

499-C Houston _____

......
0

506-B 506-C 508-B

Columbia ______
Columbia __ Grady _____

508-C Grady ______

510-B Screven ___

511-B Crisp ____ ----------513-B Bacon _____

514-B Thomas ___ 517-A Pike ______

517-B Meriwether ____ 520 Macon ____

520-B Taylor _______ . . . . . ---

525 Douglas. ___ 526 Turner ____

527 Richmond

528 DeKalb ____

528 Fulton ___ 529-A Barrow ____

529-A Jackson __

2.232

.026

.963

5.159

2. 620

.099

12

.027

10

4.901

10

1.104

.050

.034

3.314

5.247

. 723

11

5. 931

.094

3.314

3.319

. 706

.078

4.867

2

5.291

3

2.874

4.228

.022

10

1.679

5

--------- ----- -----

.862

.004

1
:_:_:_:_:_:_:_:_:_:_:_: _:_:_:_:_:_:_:_:_:_:_:_:) -

:;0;
.093

----
:::::

:

------
::::::

:-::::::::::r:::::::

::

.862
:::::::::::r::::::::::

.004 .050 .024

STAT HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

Top Soil

Gravel

Project

COUNTY

Eng. Cong. Comm. Graded

and

and

Resurface Surface Bituminous Cement

Brick

Number

Div. Dist. Dist.

Earth

Sand Clay Macadam

Treatment Concrete Concrete

-----1-------- ---- ---l----l----l-----1-----1----l----+----l-----

529-B Jackson_.--------- ...

2.173

530 Towns_--------------

1.481

531 Rockdale.... __ -------
532-A Baker____________ .. __ 533 Cherokee_____________

2.179

.422 1.045 .217

534-A DeKalb _____ --------. 534-A Fulton _______________

3.043 .448

...... 534-B DeKalb_ ..... --------

5

""0 535-A Cobb________________ 535-B Fulton _______________

7

535-C Fulton _______________

5

535-C Cobb ________________

7

535-D Cobb ________________

7

536 Dougherty ____________

537-A Richmond _______ .....

10

538-A Peach __________ . . ____ 2 12

539 Upson _______________ 2

540 Hart_ ________________ 3

541 Clinch _______________

11

542 MitchelL ____________

543 Coffee ________________

11

544 Habersham __________ .

g

544 Stephens ______ .... ___ 586 Harris________________

590-B Baldwin ____ ._ ...... _. 2 10

5.298 3.806
4.768

5.108 3.864

1.522

4. 735

.483

5.037

.997

2.698

5.007 5.277

Structures
.011
.149 .017
.006 .018 .048 .049 .094 .048 .099 .058 .037
.007 .014

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

Top Soil

Gravel

Project

COUNTY

Eng. Cong. Comm. Graded

and

and

Resurface Surface Bituminous Cement

Brick

Structures

Number

Div. Dis!. Dist.

Earth

Sand Clay Macadam

Treatment Concrete Concrete

- - - ~-------!--- -----~ - - - - - - ------~ - - - - - - - ---~--- ---~- - - - - -~-~ ~---- ---~-

591-C 592 593-A 593-B

Bryan _______ _ Rumtcr ______________ _
Burke _______________ _ Burke_______________ _

1.991

3. 716 4.236

3.382 3.598

594 Burke ______ _

595 \rarren _____________ _

10

4.000 4. 724

3.823

597 Meriweth('r __________ _

.284

615 Harris ______________ _

4

.353

615 Troup_

4

7.830

616

Troup _______________ _

2.572

629-B Richmond_

10

651-B Pike ________________ _

-- ::::::r: ------

3.295 2.049

651-C Pike __

6

674-A Jones ________ -- ____ --

6

696-A Gilmer ____________ _

--~-: :~:: 1.495

-:::: :_ 1::::::::

3.386 11.000

738-A Carroll

I

1.022

.006

755-A Banks ______________ _

3.681

.004

771 785-A 787-C

Greene ________ _ Whitfield ____________ _ Talbot_ __

1.121

1. 703

15.374 ----- :-::::::::_- ::::::::::::1::::::::::::

800-A 800-B 804 813 817-A

Morgan __ Morgan __
Peach Butts __ Troup_

4.!121

I

12 6

,,1 !....... J I ... 1.. ,;:; 1( ..

8. 655 ------------ 1------------
6.066 ~~: ~~~~ 1~:::: ::: ::
---------,------------ !------------

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

Project Number

COUNTY

Eng. Con g. Comm. Div. Dis!. Dis!.

817-B Meriwether ___ -------820-A Johnson ______________

838 847-C 852

Gordon __ ----------Doo]y ___ ------------
"\Vilkinson

857-E DeKalb_ ___ 857-F Gwinnett ______

...... 859-B Floyd __

0 -'1

862

Tattna!L ____________

862-A Tattna!L ____

905-E Echols __

905-F Clinch ___

910-B Decatur __ 919-C ChathanL ________

932-D Wilcox_

942-D Johnson_

944-C Dodge ___

944-D 1\viggs ___

944-D Bibb __

944-E Bleckley _____ 951-A Marion _______________

951-B Marion ____

951-C Marion _____

951-D Marion ____ 976-A Jasper ________
I

12

2

:l

10 5

11 11
12 12 12 12
12

Graded Earth

I Top soil
and
Sand Clay

2. 622

2.169
3.341 1.860 9.420 1.615 2.840 5.993

1.521 .312

Gravel and
Macadam 4.000 2.672 5.079
8.455

Resurface

Surface Treatment

Bituminous Cement

Brick

Structures

Concrete Concrete

- - - - - - --~------

-------~-

I. 736
1.684 4.363

.004 .077 .029 .219

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

Top soil

Gravel

Project

COUNTY

Eng. Cong. Comm. Graded

and

and

Resurface Surface Bituminous Cement

Brick Structures

Number

Dlv. Dist. Dis!.

Earth Sand Clay Macadam

Treatment Concrete Concrete

---1--------1---------------------------1----1------------------

976-B Jasper_. __ -----------

6

1003-A TattnaiL ____________

1. 704

5.673

1003-B Candler--------------

1.585

.166

1008 ClaY-----------------

.034

1013 Effingham. ___________

3.575

.098

1014-B Wilcox. ______________

12

1.496

1021-A Marion _______________

4

1.140

1-' 1021-B Schley_. _____________

4.449

0 00

1022-A 1025-A

Jenkins ____ ---------Pulaski ______________

12

2.887

7.555

1025-C Houston ______________

12

5.134

.075

1028-B Spalding __ .---------_ 2

2

3.655

1030-A Pulaski. ___ ---------_ 2 12

2

3.968

1031

Tift_ ________________

5.496

.030

1033-A Cherokee _____________

3.050

1034-B Crisp ________________

5.366

1036 Crawford _____________

10.817

1039-B Macon _______________

6.456

.004

1041-B Calhoun ______________

4.181

.015

1042-A Calhoun ______________

2

2.113

1045-A Crawford ______ -------

6

3.520

1052-C Paulding ___ ------ ____

1053-A Lanier _______________

11

.312

1057-C Thomas______________

2

1069-B Brantley _____ --------

11

.681

3.927 5.397
.579 ------------------------------------ ____________( ___________{ .019

STATE HIGHWAY BOARD OF QEORQIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

Project

COUNTY

Eng. Con g. Comm.

Number

Div. Dist. Dist.
- - ----

1072-A Irwin_ ------------

11

1072-B Berrien __

11

1080 Bulloch ______

I

1082-A Coffee_

11

1086

Burke _____

1087-A Lanier ___

11

1087-B Atkinson ______

11

>-' 1087-C Clinch ___

11

0
~

1097-A

Taylor _______

1117 Columbia ____

10

1118 Hart_ ________

8

1121 EmanueL ____________

12

1122-B Johnson ____

2 12

1124-A Oglethorpe __

3

8

1126-A Lowndes __

11

1127-B Newton __

8

1502-A Clarke ______

1502-B ,Jack<mn_

1508-B Cherokee _______

1510-A Montgomery ____

12

!SlO-B Treutlen _______

12

1516-A Upson _______

6

1520 Banks __

1521-A Ben HilL

1522-A Telfair_

12

Graded Earth
2. 739 .492
2.516 7.308
.511
6. 933 .885
2.528
2.746 6.318

Top soil

Gravel

and

and

Resurface

Surface Bituminous Cement

Brick

Structures

Sand Clay Macadam

Treatment Concrete Concrete

---------- ------ ---- --,---------;-------- ------- ------

3.172

.151

2.697

-----

7.361

.010

.014

3. 896

3.553

I. 704

2.585

.030

1.580

2.511

3.511

1.302
3. 993 .8S4 .432

Sll9 --------,

10.253

- - - - - - - ~~-------

Project I
Number

COUNTY

1522-ll Coffee_

1522-B Telfair ___

152:l

- Tattnall ------ ~---

1524-A Turner

1524-ll Worth_

lS26 Upson_

1528-A Dougherty

1530-A Terrell

............
0

1533-ll 1534

Laurens Jeff('rson_

153\1 Douglas

1542-A Pierce_

154:J

Brooks_

1545

Newton __

1548-A Chattahoochcf' _

1S48-B Mariou_

155:l Walton_

1.158-A Clarke_

1558-B Madison.

1561-A Laurens_

1561-ll Treut.lcn_

1561-B Laurens_

15fi8-A Bulloch_

1569-A Heard_

TOTAL~--

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

I Eng. I Cong. Comm.
_o_;v.__ _ll~t. l_[)j~

Top soil and
Sand Clay

Gravel and
Macadam

Resurface

11 12

12 10 11 11 8
12 12 12
I 22.045 1

Bituminous
Concrete

Cement

Brick Structures .384 .:l83
.11:37
.024 .020

STATE HIGHWAY BOARD OF GEORGIA MILEAGE PLACED UNDER CONSTRUCTION BY ENGINEERING DIVISIONS AND
COMMISSIONERS DISTRICTS DURING FISCAL YEAR ENDING JUNE 30, 1935

Number

Division and I Division and I Division and

of

Type of Construction

District

District

District

Total

Projects

One

Two

Three

- - - 1 - - - - - - - - - - - - - - - (Miles)

(Miles)

!Miles)

(Miles)

~---------------------

48

10

..................

104 80

6

Graded Earth __ _ Top Soil and Sand Clay Gravel and Macadam__ _ Resurface __________ _
Surface Treatment_ ___ _

73.924 1.833
91.717 89.150 6.104

32.105 15.375 148.446 95.174
6.936

35.588 4.837
89.412 70.983 9.458

141.617 22.045 329.575 255.307 22.498

6

Bituminous Concrete_

42

Cement Concrete ____ _

2

Brick_____ __

78

Structures_____ _

-----------

13.468

--

__

2.326

4.521

18.899

42.065

43.163

.382

1.454 .

1.197

23.420 98.696
.382 4.977

--------1
376

TOTALS _____ _

------1~-278.522- --346.458 - , - 2 7 3 . 5 3 7 - 898.517 1

---------------------------------------~ =..::,

"-

1====-=--==1:-=----=-- _ -__=::==

STATE HIGHWAY BOARD OF GEORGIA

MILEAGE PLACED UNDER CONSTRUCTION BY CONGRESSIONAL DISTRICTS

DURING FISCAL YEAR ENDING JUNE 30, 1935

a."Gc")

.r.J.,l
..o...~~

i

z;:I 0
,t

i

Type of Construction

..,
~

1...;
~

I""' ~

I""'. ~

1.~ ..;

'..> ~

1...; . 1...;

~

~

...;
~

- ~- ~- ~- ~- ~- ~- ~- ~- ~

".Jl" oJl" i!Jl" .Jl Jl," "Jll":d]" Jl = ::a = ::a = '=~Jll"= = =G) = = ::a oblOl>:'-:-'~' ~bolEl~-1'~-~--b'llo,.Ec:-:1~"'~-

bO
o""0''

-=-~a'

obl"l"l~'>'='-a~- "ob!OtWl~.~l;!'':-1b[!loJtIl.>l'-=~-a'

oblll"b:~lll'-~'-~'

obOZO:~':--~'

o o o lo 10 o o o o

...;

...;

i:5 "G") rJl

I

.~ ~,.-,
Cla:>~

bOI=::;::I

bo.

1>-
Q) .....

=0 GE-)o'-~-..- o=i'-O~l'-

0

0

""'-~(I)~
Cl.~-'aa-::>">'-
QlE)-~o~~.
0

~~
-.ope":a;~ ::>':
o::a E-o'--'

1~:~~~115.0~0 =~~:~~ 4:~~~~-~~~~~ ~6.0~~ 13.~:7 1
48 Graded Earth~.~~ 10 Top Soil and Sand Clay

5.8251 9.814 10.148 34.682 19.349 141.617

l. 787 3.050 3.634

-------

22.045

104 Gravel and Macadam. 20.099 34.509 33.872 20.452,14. 656 38.372 29.288 15.78128.665 13.958 32.680 47.243 329.575

80 Resurface.~ ........ ... 39.596 8.897 22.677 17.925 9.107 9.353 17.606 12.322 28.759 9.012 43.103 36.950 255.307

6

Surface Treatment. .. ~~

6.104 ------ ------ ------ ------ ------

9.458 ------ -

---- - ---

~

~

~

------

6.936 22.498

6 Bituminous Concrete .. ------ ------ - ----- 4.521 3.832 .430 7.203 ------ 7.434 ~

~

~--

------ 23.420

42

Cement Concrete ------ -

~

~.

1.245

.529 11.095 1.752 22.897 10.289 18.316 7.943

.741

.912 22.977 98.696

2

Brick~~~~~~~~~~~.

. -- ---- -- ------ - ---- ------ ------

.382 ------ ------ ------ ------ - -------- -

.382

78 Structures~~-~~-~~~~~~~~[ .703 .291 .202 .170 .320 .251 .239 .211 .394

.225 1.030

.941 4.977

'IS76

TOTALS. ----- ~ ~ ~ ll3_1 752 59.942 ~.519 59.578 ~.473i77. 72187. 710:~242 86.o59 37.718 112.407[134~6! 898~7

1

1

Project No. 341- A- Baldwin CountySteel and Timber Bridge Over Oconee River Near Milledgeville.
Completed 1935.

Project No. 192- B- Bibb CountyStribling Memorial Bridge, Macon. Completed 1936.

Project Number

30-B

31-B

31-D

31-E

44-B

47

49

............
Ol

58-A 58-A

99-A

106-A

121-B

154-B

158-B

165

190-B

195

228-A

242

258-B

288

348-B

403-C

403-D

432-B

437-B

STAn HIGHWAY IIOARD OF QIU)RQIA SUMMARY OF BRIDGES PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

County

I

Number[]

I I Concrete

Timber,

Eng. Cong.l Comm.

of Concrete and !-Beams !-Beams and

Div. Dis!. Dis!. Bridges (Lin. Ft.)' (lin. Ft.) Concrete Floors

- - .. -~ -~~~ ---~~~~~-

~~- ~~~~~~

Cobb ________________

Dade ________________

:

~I ~

~

-

--

(lin. Ft.) :J:J8.0

Dade __ ------------

3

7' 3

1

Dade ________________

7

HalL _________ ------

Screven ______________

90.0 120.0 2:l2.0

MitchelL ___ Butts ________________
Butts-Jasper _________ Thomas _____

120.0

760.0

120.0

Sumter _______

Randolph ____

Wayne

11

240.0
4uo.o

Twiggs -----------

12

Polk __ --------------

Murray

Mcintosh __

Greene ____

Polk _________________

190.0

840.0 850.0

Clayton ______________

Muscogee ______ Sumter _______________

Berrien __ ------------

11

Tift ____________

Camden ______________

11

Glascock _____________

10

80.0
495.0 120.0 280.0
640.0

Timber (Lin. Ft.)
845.0

Concrete Bridge Culverts (Lin. Ft.)

Concrete Piers and Structural
Steel (lin. Ft.)

Widened Concrete (Lin. Ft.)

122.0 48.0

89.0

46.0 24.0
28.0 44.0 27.0

121.0 188.0

34.0
111.0 258.0

Totals (lin. Ft.)
460.0 48.0 90.0 120.0 232.0 89.0 120.0 126.0 760.0 46.0 240.0 24.0 460.0 190.0 34.0 121.0 840.0 850.0 139.0 124.0 258.0 495.0 147.0 468.0 845.0 640.0

Project

County

Eng.

Number

Div.

452-C
484 4[10-B 491-C 498-B 499-C 506-B 506-C 508-B
51~-B
517-B 526 528 529-A 529-A 530 533 534-A 5:15-A 535-B 535-C 535-D 536 537-A 538-A 539

Bulloch _____________ _
Richmond ___________ _ Fulton ______________ _ Gordon _____________ _
HaiL __ ------------Houston ______ _ Columbia ____________ _ Columbia ____________ _
Grady_ Bacon ______________ _
1 Meriwether
Turnrr -------------Fulton-DeKalb. __ _ Barrow______________ _
Jackson-Barrow ______ _
Towns_-------------Cherokee____________ .
DeKalb... ----------Cobb ________________ _ Fulton ______________ _
Fulton-Cobb ___ ._. ___ _
Cobb--------- 'I DoughPrty___________ _
Richmond ___________ _ Peach _______________ _ \ Upson _________ _____ _

Cong. Dist.

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF BRIDGES PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1935

Comm. Dist.

Number

Concrete

of Concrete and 1-Beams

Bridges (Lin. Ft.) (Lin. Ft.)

Timber, 1-Beams and Concrete Floors
(Lin. Ft.)

Timber (Lin. Ft.)

10

150.0

I, 210.0

525.0

12

144.0

10

80.0

10

246.0

180.0

11

500.0

407.0

120.0

100.0 95.0

260.0 790.0

59.0

5

96.0

5&7

515.0

10

202.0

12

Concrete Bridge Culverts
(Lin. Ft.)

Concrete Piers and Structural
Steel (Lin. Ft.)

Widened Concrete (Lin. Ft.)
159.0

142.0

23.0

37.0 34.0
23.0 34.0

Totals (Lin. Ft.)
159.0 150.0 1,210.0 142.0 525.0 144.0 80.0 269.0 180.0 500.0 407.0 120.0 37.0 134.0 260.0 59.0 790.0 118.0 34.0 96.0 515.0 48.0 360.0 202.0 530.0 302.0

STAT& - A Y - CIP _ , . SUMMARY OP' BfttDGU PLACm UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 193&

Project

County

Number

Concrete

Timber,

Eng. Cong. Comm. of Concrete and 1-Beams 1-Beams and

Timber

Concrete Bridge

Concrete\ Piers and Widened Structural Concrete

Totals (Lin. Ft.)

Number

Div. Dist. Dist. Bridges (Lin. Ft.) (Lin. Ft.) Concrete Floors (Lin. Ft.) Culverts

Steel

(lin. Ft.)

(Lin, Ft.)

(Lin. Ft.) (Lin. Ft.)

I - - - - - - - - - - - - - - - :~-

-~---~-

----------------------------------------

540
543 544 592 738-A 755-A 859-B 905-F 932-D
...,............ 944-D 1003-B 1008 1013 1025-C 1039-B 1041-B 1057-C 1069-B 1087-A 1121 1522-B 1523 1530-A 1533-A 1534-B 1545 IM8-A 1561-B

Hart..... ----------Coffee ___ -----------Stephens. Sumter ____
Carroll Banks _________ Floyd _____
Clinch Wilcox __ Twiggs _______
Candler-------------Clay _________________
Effingham. __________
Houston ____ --------Macon ___________ ---_
Calhoun... ___ ------Thomas. _____________
Brantley-------- ______ Lanier __________ -----
EmanueL _____ ------Coffee-Telfair _________ Tattna!L ____________ TerrelL ______________ Laurens ______________
Jefferson _______ -----Newton ____________ -Chattahoochee ________ Treutlen-Laurens ______

8

3

II

II 12 12
I
12

II 11 12 11&12

12

10

2

8

3

12

__ -----------78.0

234.0

100.0

200.0
!20.0
280.0 I, 143.0
820.0 460.0 320.0 160.0 100 0
160 0 3,631.0 1,250.0
200.0

409.0 180.0 1,803.0

_________ -------- -- --------37.0
34.0 34.0
27.0

23.0 27.0 55.0
46.0 21.0 42.0

420.0

200.0 37.0 78.0 34.0 34.0 120.0 27.0 409.0 280.0 I, 143.0 820.0 180.0 460.0 320.0 183.0 100.0 27.0 1,803.0 55.0 160.0 4,051.0 I, 250.0 46.0 21.0 42.0 100.0 200.0 234.0

TOTALS. _________ '------- -------- -------- 126

623.0

4,124.0

17,302.0

3,296.0

762.0

729.0

915.0 27,751.0

STATE HIGHWAY BOARD OF GEORGIA

LABORATORY

MATERIALS TESTED OR INSPECTED

July 1,1934 to June 30,1936

--- Kind of Material
j.Spbalt--- .--------------

jj..SSppbbaalltt SMaInXd._-_-

________ _

seamS----------------------------

sronze __ --------- ------------

ooeomaresnetA.-g--g-re- -g-a-t-e ___________ _

ooncrete Cores_-_

_ __

ooncrete Cylinders __ _

ooncrete Pipe- __ - __ ----

corrugated Metal Pipe __ :Expansion Joint__________________ _

rertilizer--- - -rmer (Asphalt) __ orader Blade_ orease ___ ------ouard Rail_-_ L!IIlerock ___ . ______ .
on _________ _
Asbestos ________ _

Paint---:-------Right of Way Markers__

Sand-----------Sign MetaL Sodium Silicate ___ _ SteeL __ - __ _ Tar ______ _
Timber ___ _ Top Soil __ _ Water ___ _

~~-N_u_m_b_er~-


------ i

700
9
7l 50
2 2436 1669
502 2626
184 632 65
3 l
l
53 23 404 62
l 133 23
715 l
l
344 410
3 3610
154

TotaL __ _

-1-14,888-

~~~~~-'----

119

PART THREE
FISCAL YEAR ENDING JUNE 30, 1936

STATE HIGHWAY BOARD OF GEORGIA

Exhibit "A"

STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES

JUNE 30, 1936

ASSETS

Current Assets Cash in Banks State Funds _______ ------------ ________ ---National Recovery Trust Fund______________

$ 4, 720,373.00 387,598.41

$ 5,107,971.41

State Treasurer, Highway Funds ______________ _
U.S. Government, Vouchers in Transit Federal Aid Projects _______________________ _
National Recovery Projects. ________ -------Works Program Projects __ ------------------

$ 1,015,169.02

60,549.05 205,507.39 120,905.52

386 ...961.96

Accounts Receivable ____________ ------ _______ _ Advances ____ _
Deferred Charges Inventory of Supplies and Materials ___________ _ Shop Jobs in Process ____ --------------------Undistributed Payrolls __ ----- ________________ _ Undistributed Charges, Misc. _________________ _

191,036.26
1,345.00 $ 6,702,483.65 ---.-,---

122,729.00 11,390.26 54,027.21 27,487.44

215,633.91

Total Proprietary Assets ___ ---- ______ ----------- ___ _

s 6,918,117.60

Capital Investments Land, Buildings & Equipment (Schedule No.4) Land ____________________________________ _

Buildings ________ _ Trucks ___________________________________ _

Tractors___

__________________ ---

Other Road Equipment ____________________ _

Engineering Equipment__

--------------

Office Equipment ________ ------------------

Shop Equipment___

----------------

Laboratory Equipment ____________________ _

Quarry Equipment_ -----------------------

178,795.2~
314,719.00 189,750.00 135,170.00 266,091.78 34,993.71 36,851.45 42,760.00 13,653.90 48,508.00

$ 1,261,293.09

Roads and Bridges Construction Cost to Date On Closed Projects ____ _
On Open Projects

$139,368,582.51 !4,921,958.73 $154,290,541.24

W. & A. Rental Warrants ____________________ _

$ 1,620,000.00

Total Capital Investments _________________________________________________ $157,171,834.33

TotaL ___________________________________ --------- __ ------ ______________ $164,089,951.89 ===--===
122

STATE HIGHWAY BOARD OF GEORGIA

Exhibit "A"

STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES

JUNE 30, 1936

LIABILITIES, FUND BALANCES AND SURPLUS

c.rnnt Liabilities
Accounts Payable.--------------------------U.S. Government Advance ___________________ _

none 600,000.00

Total Proprietary Liabilities ____ . . ----------. __ ------

600,000.00

...... 81Jances (Schedule No: 6) .. Construction Contract Ltabihties Contracts, State __ _....._----------------------Contracts, FederaL.-----------------------

$ 2, 732, 155.69 4,302,7413.17

TotaL __ ----------------------------------------------

Less: Participation Receivables

Federal Funds ... ------------------------ $ 3,354,163.24

Other Funds, Net._______________________

16,940.63

$ 7, 124,901.86 S 3,371,10:1.87

Net Liabilities, State Funds ____________ _
Unencumbered Allotments Balances Construction, State Forces __________________ _ Reconstruction Projects_------------- ______ _ Survey Projects . . . __ . . . _. ___ ._. ___________ _
Maintenance, GeneraL ___________ ----------Convict Farm_____________ ----------- _____ _ Refunding Certificates, 1936 ________________ _

s 3,753,797.99

594,200.34 277,976.92 59,977.50
73,868.29 62,542.73 11,819.32

1,080,385.10

Unliquidated Purchase Orders _________________ _

261,620.65

Total Fund Balances ______________ ------ ______ ---- __ .. _______ ---._______ $ 5,095, 803.74

C1f1ta1 Liabilities and Surplus
Capital Liabilities Refunding Certificates-Due I 936-1945. _____ _
Surplus Invested in Plant & Equipment. _____ _ Surplus Invested in Highways _________________ _ SurplUB Invested in "\V. & A. \\"~"arrants _________ _

s 23,957,085.44
1,261,293.09 130,333.455.80
I ,620,000.00

Total Capital Liabilities & Surplus. ________________ . __________ ---- _______ $157, 171,834.33

t:.nnt Fund Surplus-Exhibit "B" Surplus Deficit, State Funds ___________ _
Surplus Reserves For County Construction Contracts-Detail Estimates Incomplete ____________________ _
For Revolving Fund (Doubtful Assets and Deferred Charges) _______________________ ---_
For Redemption of Refunding CertificatesMarch, 1937 _______ ---------------------

624,075. 75Dr.
91,141.21 424,955.80 1,330,292.56 $ 1,846,389.57

Net Surplus, State Funds ___ _ TotaL _______________ _

1,222,313.82 $164,089,951.89

NOTE: Current Surplus, as ahoYe, does not include unallottcd Federal Funds amounting to Sl2 ,265,599. 96
123

STATE HIGHWAY BOARD OF GEORGIA RECONCILIATION OF FUND SURPLUS REFLECTING FUND REVENUE, ALLOTMENTS AND RESERVES
JULY 1, 1935 TO JUNE 30, 1936

Exhibit "8"

Current Fund Surplus, July 1, 1935

Available Surplus, State Funds _________________ $ 1,319,948.09

Less: Lapsed State Appropriation____________

963,348.71

356,599.38

Surplus Reserves _________ -~ ___ _

1,729,530.15 $ 2,086,129.53

FUND REVENUE

Revenue Received (Schedule No.7)

Motor Vehicle_______________________________ S I, 392,012.38

Gasoline Taxes ________________ ----------_____ 10,404,393.81

Miscellaneous Income ____________ ------------

1,442.13

$11,797,848.32

Estimated Participation Accruals National Recovery Allotments ________________ _
\Vorks Program Allotments_------------------Other Federal Allotments _________ ----------Other Construction Participation_

$ 1,336,978.16 1,147,576.33 1,046,442.72 6,075.12

$ 3,537,072.33

Total Fund Revenue ____ _

$15,334,920.65

Available for Allotments ___ ------------------- _______________ _

$17,421,050.18

FUND ALLOTMENTS

Continuing Allotments (Schedule No. 6)

Construction Projects Contracts, State Aid ____________ _

s 5,403,634.15

Contracts, National Recovery _____ ---------- 1,483,137.12

Contracts, \Vorks Program ___ --------------- 1,210,052. 96

Contracts, Other FederaL _____ _ State Forces & Materials ____________ _

2,266,126.02 784,135 fill

$ll, 147,085.91

Murvey Projects _____ _ Reconstruction Projects Maintenance, GeneraL _______ . ______________ _
Redemption of Refunding Certificatco_

213' 762.72 659,560.75
1 '175' 724. 84 2,660,585.12

Total Continuing Allotments __ _

$15,856,719.34

Non-Continuing Allotments (Scherlule No. 6) Administration ____________________ _
Research and Analysis Collection of Revenue ______________ _ Quarry _____________________________________ _
Equipment __________ ----- __________________ _ Shop, Net ____________ _
Legislative TransfersMotor Vehicle Tags __

228' 887 05 i6 .10
42,181.59 I ,420.19 l1 '758 .03
128. 67Cr.
57' 822.73

Non-Continuing Allotments_ Total Fund Allotments ________________ _

342,017.02 $16,198,736.36

Current Fund Surplus, June 30, 1936-Exhibit "A" Surplus Deficit, State Funds. Surplus Reserveo. __

624,075. 75Dr.
s 1,846,389.57 1,222,313.82

124

THE HIGHWAY DOLLAR
/i3t7erc/ /0nt7S C'3.96%
INCOME
U/?o( ,&v//b/a'f'S & c.r~//,Pn=-or .a7%
C<?n.57"rvc7"/~n ?/.a6%
EXPENDITURES JULY I 1935 TO JUNE30 1936

STATE HIGHWAY BOARD OF GEORGIA

Exhibit "C"

STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES

JULY 1, 1935 TO JUNE 30, 1936

REVENUE RECEIPTS

State Treasurer Motor Vehicle Fees __________________________ _
Fuel Oil Tax ________________________________ _

$ 1.392,012.38 10,404,393.81 $11 '796,406,)g

U. S. Government Reimbursements for Construction: National Recovery Projects _________ ----- __ _ '\Vorks Program Projects ________ ---- _______ _ Othe~ Federal Projects _____________________ _

$ 3,038,813.82 354,522.20 327,498.75 $3,720,834.77

Railroads, Counties and Cities Cash for Construction ____ _ Contract for Construction ___________ _
Miscellaneous Income ___________________________ _
Total Hevenue Receipts _______ _

9,124.35 121.42

9,245.77

1,442.13

$15,527,928.86

EXPENDITURES

Ad ministration (Schedule No. 8-A) General Administration General Office ____ ----------- __ ---- ________ _
Division Offices ___ ------------------------\Varchouse _______ ---------- ______________ _

187,368.42 29,513.22 13,547.32

Research ___________________________________ _
Collection of Revenue. ______________________ _ Quarry _____________________________________ _

230,428.96
329 0 79 42,181.59 1,419.24

274,359.58

Construction (Schedule No. !l-8) Surveys Actual S"rveys ____________________________ _
Plan-------------------------------------

117,193.39 93' 215 0 91

210,409.30

Construction Supervision _______________________________ _ Actual Construction ___________ -------------

427' 189.58 10,108,652.63

10,535,842.21

10,746,251.51

Maintenance (Schedule No. 8-C) General Supervision _______________________________ _
Actual Maintenance __________ --------------

s 54,794.60
1,082,938.23

$ 1,137,732.83

Reconstruction Supervision. ______________________________ _
Actual Reconstruction _____________________ _

2,698.49 242,405.48

245,103.97 5 1,382,836.80

126

Exhibit "C" Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES

JULY 1, 1935 TO JUNE 30, 1936

EXPENDITURES-Cont'd.

Llflll Buildings & Equipment (Schedule No. 8-D)
Adroinistratwn Equipment . ----------------------------
eonetruction Equipment..------------------------------
Maintenance Equipment.-------------------------------

2,664.66 5,603.78 2, 782.81

11,051.25

Llllllatlve Transfers (Schedule No. 8-E) Motor Vehicle License Tags.- .. ------_ ...... .. Prison Farm Purchase ... -------_ ...... ______ _

57,822.73 2, 775.00

60,597.73

Redemption of Debt (Schedule No. 8-F) Refunding Certificates_----------------------

$ 2 ,648, 765.80

Total Expenditures _________ .. ------.----------- __ .. ----------------______ $15,123,862.67

El..,.. Revenue Receipts over Expenditures.........

404,066 .19

Add
Excess Proprietary Assets over Liabilities July 1,
1935.------------------------------------Less: Lapsed State Appropriation _________ _

$ 6,877,400.08 963,348.71 $ 5,914,051.37

El..,.. Proprietary Assets over Liabilities, June 30, 193&----Exhibit "A"----------------------_ ......

s 6,318,117.56

RECONCILIATION
Elceoe Proprietary Assets over Liabilities (As above). Available for Liquidation of Fund Balances and Surplus Reserves .... _____ .... _._ .. _. ____________ __
lund Balances (Contracts-Allotments-Purchase Orders, Etc.) ... ------- ..... ------------------

$ 6,318,117.56 5,095,803.74

Net Surplus State Funds______ -------- __ -------------------- $ 1,222, 313.82

Surplus Reserves (Refunding Certificates, Doubtful As-

eels, Deferred Charges, Unrecorded Contracts)_____

1,846,389.57

Surplus Deficit, State Funds June 30, 1936--Exhibit "A" ________ ------

624,075.75Dr.

127

STATE HIGHWAY BOARD OF GEORGIA

COMPARATIVE STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES

FOR FISCAL YEARS ENDED JUNE 30, '33, '34, '35, '36

================================~F=IS=C=A=L=Y=E=A=R==~

FISCAL YEAR

FISCAL YEAR

Description

ENDED JUNE 30, 1933

ENDED JUNE 30, 1934

ENDED JUNE 30, 1935

Detail

Amount

Detail

Amount

Detail

Amount

Motor Vehicle Fees ______________________ _ Fuel Oil Taxes __________________________ _
Counties, Prior to Refunding Act__________ _ Railroads, Cities and Counties ____________ _ U.S. Government _______________________ _
Miscellaneous Income____________ ------- __

1,120,670.19 7,786,322.58
276,143.27 12,960.06 5,065,020.34 18,852.02

REVENUE RECEIPTS $ I, 233,125.52 8, 779,497.63 24,935.82 15,529.22 4,048,503.74 12.244.63

1,206,051.30 9,655,076.41
28,446.52 6,232,390 34
22,757.91

Total Revenue Receipts ______________ _

14.279. 968 .46

$ 14,113,836.56

$ 17,144,722.48

Exhibit "D"

FISCAL YEAR

ENDED JUNE 30, 1936

Detail

Amount

$ 1,392,012.38 10,404,393.81
9,245. 77 3,720,834.77
1,442.13
$ 15,527.928.86

......
~ Administration General Administration General Office _______________________ _ Division Offices __ -------------------\Varchouse ____ -------------------- __
Research _____________________________ _ Collection of Revenue__________________ _ Quarry-------------------------------
Total Administration ______________ _

EXPENDITURES

294,317.75 66,853.16 18.298.48 $

379,469.39

7,103.81 79,507.38
876.49

466,957.07

200,819.74 39,104.74 13,509.19 $

253,433.67

2,480.03 41,812.11
940.21

298,666.02

197,599.85 28,760.34 13,348.89 $

239,709.08

175.39 39,020.14 1,157.10 -------
280,061.71

187,368.42 29,513.22 13,547.32 $

230,428.96

329.79 42,181.59 1,419.24
~-----
274,359.58

Construction Surveys_______________________ ------__
Construction Supervision. _________________________ S 672,861.64
Actual Construction.----------------- 10,696,769.96

127,316.44 11,309,631.60

Total CoDBtruot\on~ ~~~--~----------

11,496,948.04

392,117.74 8,481,204.62

142,906.71

239.930.98

210,409.30

444,001.33

427,189.58

8,873,322.36 10,936,059.00 11,380,060.33 10,108,652.63 10,535,842.21

9,016,229.07

11,619,991.31

I IO, 148,2/11 .III

Description

STAT& HIGHWAY IIOARO OF OllORGIA COMPARATIVE STATEMENT OF REVENUE RECEIPTS AND EXPENDITURES
FOR FISCAL YEARS ENDED JUNE 30, '33, '34, '35, '36

FISCAL YEAR

ENDED JUNE 30, 1933

Detail

Amount

FISCAL YEAR

ENDED JUNE 30, 1934

Detail

Amount

FISCAL YEAR

ENDED JUNE 30, 1935

Detail

Amount

--~-

FISCAL YEAR

ENDED JUNE 30, 1936

Detail

Amount

Maintenance Reconstruction _______ _ General Maintenance Supervision_________________________ _ Actual Maintenance ________ ----- _____ _
Total Maintenance ________________ _
Land, Buildings and Equipment. ... ~ Legislative Transfers ____________________ _ <e Redemption of Refunding Certificates ...
Total Expenditures ___________ ------

10,022.11 82,674.30 1,306,631.06 1,389,305.36
1,399,327.47 64,477.08
1,108.909.15
$ 14,536,618.81

66,298.72

14,219.21

245,103.97

79,507.15 1,051,282.24 1, 130,789.39
1,197,088.11
133.906.93 54,368.05
----- --~----
s 10,700.258.18

~2.910.83
1.098,943.18

1,161,854.01

1,176,073.22
-----
18,695.01 2,060,606.62
------------------
$ 15,155,427.87

54,794.60 1,082,938 23 ------

1,137,732.83 1,382,836.80

11,051.25
60,597.73
2,648,765.80 -------
s 15,123,862.67

Excess Expenditures over Receipts ___ -----Excess Receipts over Expenditures ________ _ ADD
Cash,Inventories,etc.,beginning of Period.
BALANCE Cash, Inventories, etc., end of Period_----
DEDUCT Fund Balances-Contracts, Reserves, Encumbrances end of Period ____________ _

256,650.35 1,731,177.44 $ 1,474,527.09 4,436,080.54

3,413,578.38 1,474,527.09 I 4,888,105.47 3,934,744.57

1,989,294.61 4,888,105.47 $ 6,877,400.08 5,557,451.99

404,066.19 5,914,051.37
-----
6,318,117.56
6,942,193.31

Fund Deficit, June 30, 1933, '36..........

2,961,553.45

624,075.75

Fund Surplus, June 30, 1934. '35 . . . . . . . . .

953,360.90

$ 1,319,948.09

STATE HIGHWAY BOARD OF GEORGIA LAND, BUILDINGS AND EQUIPMENT JUNE 30, 1936

8cb.edu\e No.4.

Appraised

Description

Value

July 1,1935

------------------------ -----------

Additions for
Fiscal Year 1935-36

Total

Depreciation

Appraised

June 30,1936 for Fiscal Year

Value

1935-36

June 30,1936

------------ ------------- ---------

Land ____________________________ $ 178,795.25

Buildings _______________________

314,729.00

Automobiles ____________________

------

Trucks _________________________

268,445.00

T r a c t o r s _______________________

133,760.00

Other Road Equipment_ _______

321,139.60

Engineering Equipment ________

36,421.00

Office Equipment ______________

39,513.70

Shop Equipment _______________

47,599.00

Laboratory Equipment_________

14,953.00

Quarry Equipment_____________

52,763.00

Totals_____________________ $ 1,408,118.55

------ -----------$
---- -------------

178,795.25

------ --- ----

$

314,729.00 $

10.00

178,795.25 314,719.00

- - - - - - - - - -

---

----. -----. ------

--

-

------

$

2,118.97

270,563.97

80,813.97

189,750.00

2,575.00

136,335.00

1,165.00

135,170.00

1,340.37 3,560.80

322,479.97 39,981.80

56,388.19 4,988.09

I
I

266,091.78 34,993.71

1,194.14

40,707.84

3,856.39

36,851.45

-- . -" ----------

47,599.00

4,839.00

42,760.00

261.97

15,214.97

1, 561.07

13,653.90

---- -------------

52,763.00

4,255.00

48,508.00

------------- ----------- ------------

1$

11,051.25 $ 1,419,169.80 $ 157,876.71

Total Appraised Value,June 30,1936-Exhibit "A" _____________________________________________________ _

1,261,293.09

Schedule No

STATE HIGHWAY BOARD OF GEORGIA

.G

STATEMENT OF REFUNDING CERTIFICATES

JUNE 30, 1936

Due March 25,1937 through March 25,1945

l County
Appling __________ $
Atkinson _______ _ Bacon __________ _1 Baker ___________ -~ Baldwin ________ _ Banks __________ _ Barrow ________ _ Bartow ________ _
BBiebnbH__i_l_L__-_-_-_-_-_--_ Bleckley _______ _ Brantley ________ _ Brooks__________ . Bryan ___________ . Bulloch. ________ _ Burke ___________ _ Butts. __________ _
Calhoun. _______ _ Camden ________ _ CampbelL ______ _ Candler.. _______ _ CarrolL ________ _ Catoosa .. _______ . Charlton _______ _ Chatham _______ _ Chattahoochee __ Chattooga______ _ Cherokee _______ _ Clarke __________ _ Clay ____________ _ Clayton_________ _ Clinch __________ _ Cobb ____________ _ Coffee .. _________ _ Colquitt. _______ _ Columbia_______ _ Cook____________ _ Coweta _________ _ Crawford _______ _ Crisp ___________ _ Dade____________ _ Dawson _________ _ Decatur ________ _ DeKalb _________ _ Dodge __________ _ Dooly___________ _ Dougherty______ _ Douglas _________ _ Early ___________ _ Effingham ______ _

Amount 1I' --~unty

I

~

1_ _

219,348.13 1 Elbert ___________ !$

I 11,083.14
23,645.61

EmanueL-------~ Evan~------------

22,472.48 Fannm__________

89,934.80 I' Fayette__________ !

67,672.43 Floyd------------~
64,548.72 I Forsyth__________

111,869.86 Franklin ___ ------~ 55,260.52 I Fulton___________

752,261.91 Gilmer_ __ -------- 'I

23,945.61 Glynn--_-------32,431.46 Gordon_________

323,388.46 Grady_---------

27,561.22 Greene_--------

111,383.08 Gwinnett_______

219,267.59 Habersham_____

74,536.29 HalL_________

8,979.97 Hancock________

11,836.80 Haralson_------

185,303.99 Harris ___ ----

27,751.88 Hart____________

471,433.40 Heard_________

20,828.57 Henry__________

73,213.40 Houston______

1,179,071.51 Irwin ____ ----___

16,088.37 Jackson_-------

112,309.30 Jasper__________

179,558.75 Jeff Davis.______

335,679.42 Jefferson_______

42,426.98 Jenkins__________

44,282.18 Johnson________

55,938.20 Jones___________

250,751.52 Lamar._________

68,364.98 Laurens________

161,001.05 1 Lee_____________

55,678.75 Liberty_________

188,759.64 1 Lincoln__________ 438,550.17 I Long____________

28,538.26 Lowndes________

82,385.65 1 Lumpkin_______

67,382.48 Macon__________

23,142.05 Madison________

334,466.88 Marion_________

233,864.81 McDuffie________

57,692.24 Mcintosh_______

172,820.62 Meriwether_____

444,523.70 Miller.__________

40,044.91 Milton __________ -~

70,052.51 MitchelL________

51,651.95 Monroe__________

14644494,,,985298168...911097 168 313 45 34827:,715743.:8697
58,672.77
97,888.93 102,533.47
50,517.56 378,670.75 81,940.13
100,770.78 55,496.67 185,426.36 307,563.04 360,352.22 68,331.47
134,693.87 96,010.76 112,955.75 17,218.58 197,632.40
262,252.29 50,890.78
114,830.42 82,492.75 30,058.77 315,814.98 76,578.01 32,084.54 38,589.70 17,549.19 255,818.70 73,358.79 28,198.85 29,547.41 34,357.18 492,549.39 75,682.85 174,233.75 18,323.46 20,536.07 48,284.83 13,749.75 365,322.53 31,856.25
18,641.79 375,473.80 107,446.43

132

Schedule No.5-Cont"d. STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1936 Due March 25,1937 through March 25,1945

County

Amount

County

Amount

)r{ontgomery----- $
){organ.--------)r{urraY---------)r{uscogee ... -- --Newton... -------
oconee. Oglethorpe-----paulding .. ------peach.. ----------
Pickens.--------Pierce.- --- - - - - - - Pike .. - - -- - -- - - - Polk.. ----------PUlaski.- --- -- -- Putnam.-------Rabun.. - -- --- -- Randolph__ ------
Richmond.-----Rockdale ... ----Schley.- .. ------Screven_________ _
Seminole .. ___ ---Spalding________ _ Stephens ______ _ Stewart _________ _ Sumter _________ _ Talbot __________ _
Taliaferro ______ _
Tattnall ____ _ Taylor __________ _

112,122.63 Telfair. __________ $

66,949.05

233,291.15 TerrelL _____ .____

244,373.30

80,830.04 ' Thomas___ ___

352,450.50

745,035.36 Tift__

160,072.17

85,921.83 Toombs__

185,023.86

23,495.78 Towns___________

40,575.83

35,351.32 Treutlen_________

1,800.00

17,241.52 Troup___________

568,130.01

7,375.22 1 Turner__________

21,945.85

::::::: 108,860.86
152,888.09

i ~~{~~s:~::

~~:~i~_-g2

11,527.22 Upson___________

109,427.81

165,068.73 Walker.__________

168,368.46

218,169.47 Walton._________

145,673.57

92,944.54 Ware_

571,115.46

286,767.90 Warren__ _______

20,343.46

74,509.93 Washington_____

95,827.06

1, 025,841.59 Wayne_ _________

245,393.59

1,882.76 Webster_________

12,366.16

49,969.34 Wheeler.___

119,756.40

36,676.08 White______

31,925.54

23,167.83 Whitfield.___

238,976.44

339,917.54 Wilcox_ .. _________

9,084.28

119,728.53 Wilkes_

_ _ _ _

241,878.55

45,497.61 Wilkinson .. ______

32,454.60

328,832.75 Worth___ _______

220,521.40

66,909.56 Coastal Highway

794,608.98

14,122.67 39,079.86

-1$ TotaL ____ 23,945,266.12

23,450.89

Due March 25,1936 but not presented for payment.

Columbia. ______ .$ Dade_____________ Dawson__________ CampbelL_______ Fulton___________
~ton___________
Rockdale________
Coastal Highway

1,301.22 7, 486.94
571.34
589.33 192.61 1,071.31 209.19
397.38

TotaL _____________ _

------------ __ $

11,819.32

Grand TotaL ______________ _

_____________ $ 23,957,085.44

133

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6.

SUMMARY OF ALLOTMENTS AND FUND BALANCES; ALSO, REFLECTING RECONCILIATION WITH EXPENDITURES

JULY 1, 1935 TO JUNE 3J, 1936

DESCRIPTION

Net I Estimated

I

Fund Balances Participation Fund Balances) Allotments

_ _ _ _ _ _ _ _ _ _ _J_u_l_y_1_,_19_3_51 July 1,1935 July 1,1935 _ 1_ _ _ _ _

- - - - - - - - ----~-

--~--------

Net

Encum-

Expenditures

Total

brances_ _________ Charg(ls_

Estimated

Net

I Fund Balances Participation Encumbrances
_J_"""_~__l_~~ June 30, 1936 June 30, 1936

1
Continuing Allotments

I

Construction Contracts, State Aid__ _________ $2,370,487 37$

20,111.28$2,390.598

1
55$

5,403.534

151$

85.06Cr. $ 5,0ti2,162.17 $ 5.062,077.111$ 2,732,155.69$ 16,940 63$ 2,71.1,215.06

Contracts, Kational

I

]

I Recovery___________ 370,682.52 3,520,347.71 3,891,030.2:!

Contracts, Works

j

Program ___________ ------------------------------------~--

1,483,137.12 1.210,052.96

]
576.46Cr~ 3,476,468.50 3,475,892.04

95.65

3:l8.87!.02j' 338.966.67

1
1,8!J8,275.31j 1,818,512.05
871,086.29 793,054.13

79,763.26 78,032.16

Contracts. Other Federal____________

19,991.57, 23,653.09

j
43.644.66 2,266,126.02

190.95

685.195.16j 686.386.11 1,623,384.5711 742,597.06 880,787.51

Stat

T~~~fr~~:~:uct~~n
e Forcrs and Ma-

~~~~:~~:~~~~=12.08

I$6,325,273.:I~~~~6~95.

a:~~-

374-~2~-I$-~.~3~.:6:11

~~~~3-.:~~

~~7~:;~~:~~~~~~~~~~.

$-~:.7~9~7.:

terials .. _______ -~~400 !)[)~~~~ --~9.400 991--/'8~3~~ -~~9();)~~ __ 972, 145~31)1 _9HJ,336~3_1, _ __594 ,200.~ ~~~~~ _ __ii94_:200.34

Total Construction $3,490,562.45 ~3 ,564, 112.081$7,0,14,674.53 $1!, 147,085.91 $ 53, 183. 97Cr.ISIO, 53,1, 842.211$10,482,558.241$ 7, 719,102.20 $ 3,371,103 .87 $ 4,34 7, 998.33

Surveys..~-.------------
lleconstructwn__________

56,~03.27:-------------1 56,30~27 10,147.15-------------1

1 1
10,741.151

I 213,762.72 , 320.8!Cr.
659,560.75 14,,227.61

210,40?.30 245,103.97

2)0,088.4U 3.12.3,{1.58

~U,977.501--------------
2,7,976~92 --------------

59,977.50 277,976.92

Maintenancc(Sch.?\o.6-A) 46,132.491-------------~ 46,132.491 1,175,724.84 10,256.21

1,137,732.83 1 1,147,989.04

7:3,868.29--------------

7:3,868.29

~~d~~~~~~".;rii;,[~~ctir;g

65,317.73 _____________

65,317.73~-------------- --------------~

2,77s.ool

2,775.00

52,542.73 ______________

52,542.73

I I I Certificates.. .......... -------------~~~~:..::.:__ _2,66~~.5_:~2 ~~-~.:.:_::~l __::_648,'/(i.5_:~l_2,648,_765.80

11,819.32 --------------

11,819.32

1

Total Continuing AI-~
lotments _________

~~9~I!~~~~~~~I~~~~

~~9~:!j '~~~~

$14,884.608.'_5/~~!J!

!c~~

!,~

STATE HIGHWAY BOARD OF OEi>ROIA
SUMMARY OF ALLOTMENTS AND FUND BALANCES; ALSO, REFLECTING RECONCILIATION WITH EXPENDITURES JULY 1, 1935 TO JUNE 30, 1936

DESCRIPTION

. 1

Net

Estima-ted 1

-------N-et-

Fund Balances Participation 1Fund Balances 1 Allotments

Encum-

Expenditures

I July 1,1935 1 July 1,1935 July 1,1935 I

Non-Continuing Allotments-~,-- - - -~--

--I

--.- -- -- -

brances

I Ad(m~cihn.if'Ntraot..iloin-B)_ . ___
Hescarch (SelL No. G-Il) __

-j

I

_f

__ $228,887.0.1 Sl..l41.!11rr.l$

71i.10

25:LG9Cr.

Collection of Rl'nnue (Sch. No. li-B)___ ____

Quarry(i'ch. Ko. G-ll)__ _

E'!Uipment(~ch. ~o. 6-C)
Shop_______________ _ 1-

Motor \'chicle Lieense

Tags_______

---)-=--=__:_-__::_--_::__

-I
--
1_ 1

42.181..\'1 1,420.1\1 1 ll, 758.0.1 1 128.1i7Dr
.Si. 822 .1::;

I
. ns
71lli. ~s I 128 li7Cr.l
I

42' 181.5()1 1 '41\l. 241
11. 1),\1.251 -I
57 822./:11 I

Total

', Fund Balances

Charges

June 30, 1936

228,887.05 IIi. 10
42, 181.5!1 1.420. 1\1 11. 7.58 .IJ:l 128. fiiCr .1
5,. s2:z. 1::; I_

1 - Estimateil-~ - N e t - -
Participation Encumbrances June 30, 1936 1', June 30, 1936

1--'

Total ing

A\Nlootnn-wCnutn~t-i-nu_-,

_

1

g; -:\d Fund Balances, July 1, 1=-=-

_ __ I__
I

1.~ :)4:2 017 02

1
$

. 2lfi.;)4C'r. ~~

I
:Jn 2Ti ..Iii $:il2 '017 .02

I

I~
I

1G35__________

__ $:l.(iliU.063.6!1

I

I

,- = ===c c='

I

Estun,ltcd Partlmpahon, .Tul) 1, PJ:35 ---- !~~~,!;-==~~~

1

I

I

Fund HaLtnCeR, July 1, 1()35

__ _

_ ~~~'~' ~~~771

I

,\llotnwnts for Year-Exhibit "B" _

- - - - - $16,198, 736.:Hil

I

i'~ncumbr::mccs fur Yrar, N ct EnrumbraJtec~_ ~

10:?' 762. \01

ExpenditmeR for Yrar -Exhibit "C" _____ _ Total Charges for Year_ ________ _

__ 1$15, 12:3 RG2 67,
-- i$~?2-=t1,ti?.1 ~ 7

Fund BahncPs, .June 30, 19.16____ _

8. 20.\, 281i. !Iii

Estimated Participation, June :w, lU:HL _______ _

Net Fun(i Balances, JunP :30, U..n6 ____ _
Add Un1iqu!dah'd Purchase Onlcrs, ete ____ _

4,834,18:J.OG 261,620.65

Total Fund Balances, State Liability, June 30, IU31\-Exhihit "A" ___ _

5,095,803.74

Districts

STATE HIGHWAY BOARD OF GEORGIA DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY
UNITS AND CONGRESSIONAL DISTRICTS JUNE 30, 1936

Schedule No. 6-A.

!
Unencumbered~ Allotments July 1,1935
I

Allotments

I
Net Encumbrances i Expenditures

I
SUMMARIZED BY DIVISION UNITS DIVISION NO. 1

I Unencumbered

Total Charges Allotments

1

June 30,1936

I

57,067.45
103,481. 88 68,697.47 153,939.29
38,369.09
:---
421,555.18 $

1,765.28 3, 131. 55 1,146.57 2,902.18 1, 904. 350r.
7, 041. 23

48,219.97 $ 49,985.25 $ 6,342.18

97,156.83

100,288.38

9,990.40

56,859.70

58,006.27

10,888.40

148, 105. 10

151,007.28

7,019.90

37, 641. 96

35,737.61

2,666.21

---

387,983.56

395,024.79

36,907.09

2-L __________ __I$ 2, 405.97 $
2-3 _____________ 1 4,881.49 2-4 _________ --- 3,770.34
~=~~~~~~~=~=--~~~ 3.~g~:~g
~=i~========= __ ~~~:g~ I1_____ 1
$ j$ Totals___ __ 16, 005. 19 1

55,234.77 32,000.78 72,148.86 78,084.42 6,195.54 86,461. 94 81,865.92
411,992.23

DIVISION NO. 2

2, 190. 59

i
$ 1

52,762.35

1$

54,952.94

1$

1, 619. 430r. j 773.21
2,610.33 1 155. 76 .

31, 521. 28 I 71, 831. 66 78,908.49 5,667.39 I

29, 901. 85

72,604.87 81,518.82 5,823.15

I'
I I

;-----; 3,478.87 I
4, 935. 230r. 1

84,077. 30 84,658.28

I
' I

87,556.17

I I

79,723.05

I I

-----'-------
2, 654. 10 1$ 409,426.75 $ 412, 080. 85 $

2,687.80 6,980.42 3,314.33
398. 90 477.09 651. 910.R. 2, 709.94
15,916.57

STATE HIGHWAY BOARD OF GEORGIA

Bchedule No. 6-A-Oont.'d.

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY

UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1936

Districts

Unencumbered
Allotments July 1,1935

Allotments

Net Encumbrances

Expenditures

Unencumbered Total Charges Allotments
June 30,1936

33--45__-_-_-__-_-_-_-_-_-_-_-_- $ 3-6 _____________ 3-7 _____________ 3-8 _____________ 3-9 _____________ 3-10 ____________

352. 14 402.99
1,773.61 6,907.76 2,423.18 7,053.64
837.28

Totals______ $ 19,750.60

Totals______ $ 46,132.49

$ 8,063.72 21,099.94 14, 341. 64 82,069.26 90,051.68 117,671.98 8,879.21
$ 342,177.43
$ 1,175,724.84
I

DIVISION NO. 3

$

12.38 $ 8,097.90

186.97

20,948.49

179. 320r.

14,382.90

525. 540r.

79,579.23

219.37

90, 631. 24

823.66

118,296.31

23.36

8,386.45

$

560.88 $ 340,322.52

$ 10,256.21 $ 1,137,732.83

I

I

I

$ 8, 110.28 21,135.46 14,203.58 79,053.69 90,850.61 119, 119.97 8,409.81
$ 340,883.40
$ 1,147,989.04

$

305.58

367.47

1, 911. 67

9,923.33

1,624.25

5,605.65

1,306.68

$ 21,044.63

$ 73,868.29

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-A-Cont'd.

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY

UNITS AND CONGRESSIONAL DISTRICTS

- - - - - - - ~===

---~

~~--

JUNE 30, 1936

Districts

1
Unencumbered I Allotments July 1,1935

Allotments

Net

.

,

1 Encumbrances I Expenditures Total Charges

Unencumbered
Allotments June 30,1936

1

SUMMARIZED BY CONGRESSIONAL DISTRICTS

1--' _1_______-_-----c-1-$--1.-6-65-.-9--5---cl-$--11-2-.302.22 $1

&:: 2_ ___ ______ _ 6, 796. 90

103. 481. 88

3_____ 4________ 5_______

1 5,078.69 4,122.48 402.99

100,698.25 80,212.58 21,099.94

6______ 7__________ 8__________

5,606.91 6,907.76 2,527.88

92,426.06 82,069.26 96,247.22

9 __ -10_

7,053.64 1,279.60

117,671.98 95,341.15

11_ -----------12_

4,087.89 601.80

153,939.29 120,235.01

Totals._ _,$46,132.49- $1,175,724.84-t

3, 955.87 $1 100,982.32 1$- 104,938.19 :$

3. 131. 55

97. 156. 83 . 100. 288. 38

472.860r.

88,380.98

87,908.12

785.59

79,929.56 1 80,715.15

186.97

20,948.49

21,135.46

2,431.01

93,291.39

95,722.40

525.440r.

79,579.23

79,053.79

375.13

96,298.63

96,673.76

823.66

118,296.31

119,119.97

"'-!' 3,502.23
2,902.18 6,839.580r.

92,463.75
148,105.10 122,300.24

95,965.98
151,007.28 115,460.66

10. 250. " $1,13,. ,,,:8,- $l,i47,9so.

9, 029.98
9. 990. 40 17,868.82
3,619.91 367.47
2,310.57 9,923.33 2,101.34 5,605.65
"' 654.77 7,019.90 5,376.15
868.29-

1

1

1

STATZ HIGHWAY BOARD OJ' OBOB.OIA

acbMule'Ro.e-'B.

DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS

JUNE 30, 1936

1
Junencumbered 1 Allotments
1 July 1,1935 !
1

Allotments

Net

,

Encumbrances I

I
1 Unencumbered

Expenditures Total Charges \ Allotments

_______

June 30,1936

GENERAL ADMINISTRATION ALLOTMENTS

G. 0. _ __ _
Mtnc. Claims __ _ Const. Claims___ .. Other Claims __________ _

--- $
I

175,650.15 6,628.62 2,866.25
746.80

GENERAL OFFICE

;,76 I' I, -~

600,

177,126.75

6,628.62

2,866.25

I

746.80

1 .-~- 175, 650. 15
6,628.62 2,866.25
746.80

Totals__ _

- - - - - ~-----

-

. - -- 1$ 185, 891. 82 $

1, 176. 60Cr. '$ 187,368.42 !$ 185, 891. 82
11

WAREHOUSE

Totals_____ -I- ____ _

13,580.35

\$

33.03 1$

I

I

I

DIVISIONS

13,547.32

13,580.35 1------------------

Div. No. L____ ______________ I$

9, 608.10 $

61. 57Cr. $ 9, 669.67

2------ ------------3__ ___ __ ______________

9, 382. 01 10,424.74

6. 74 i 43. 51Cr. \

9, 375. 30 10,468.25

-------- ------------------- --

Totals___ --~---- ____________ $ 29,414.88 $

98. 34Cr. $ 29,513.22

1-------------------

Totals___ _ ~~~~~ $-228, 887. 05- $--1, 54U1ili.l-$-Z30, 428. 96

---

~------------------

,--

1

-

~~~-~~~~

Schedule No. 6-B-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30, 1936

Unencumbered! Allotments
! July 1,1936

Allotments

Net

j

I

I Unencumbered

I Encumbrances Expenditures Total Charges

Allotments June 30,1936

OTHER ADMINISTRATION ALLOTMENTS RESEARCH & ANALYSIS

Analysis ______ -I- ______________ -I$
,.... Research ______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

266. 43DrI$ 342. 53

266. 43Cr. __________________ $

12.74 $

329.79

1

~

Totals ______ l====~-$---7-6-.1-0--~-$----2-5-3.-6-90-r-. $

329.79 $

266. 43Cr. 342.53
76. 10

Totals______ ----------------~
I

COLLECTION OF REVENUE
42, 181. 59 1----------------- -I$ 42, 181.59

1,420.19 1$

QUARRY . 95
J

i' 1,419.24

42, 181. 59 1------------------
1
1,420.19
[-----------------I

STATE HIGHWAY BOARD OF GEORGIA DETAIL OF EQUIPMENT UNENCUMBERED ALLOTMENTS
JUNE 30, 1936

Schedule No. 6-Cl.

Unencumbered I

Allotments

Allotments

July 1,1935

Net Encumbrances Expenditures

Unencumbered
Total Charges Allotments June 30,1936

Ad~in:~~[~~~~ -$-~5. 68---$----:1.02---$--2,664. 66--$
... ~~~~~r._ :::i: :::::::::::-:: ~J~~: ~~ ___i~: ~~-- ~: ~~~: ~~

2,765.68 1--5,697.28
3,295.07

::':

Totals ______ !_ __________ ___ $ 11,758.03 $

706.78 $ 11, 051. 25 $ 11,758.03

1

=========:======-=-~-

I

STATE HIGHWAY BOARD Of GEORGIA MAINTENANCE APPROPRIATION JUNE 30, 1936

Schedule No, I!.D

APPROPRIATION For Fiscal Ycar I 935-:36
DEDUCT: Cnallotted Appropriation Balance at .Tune 30, 1936-Ciosed into :Surplus _____ _

$ 1,200.000.00 14.480.14

Availablc for Allotments ____ _
DEDUCT: Allotments for Year Maintenance, General Division No. l_ _________ _ 2_____ ----------------------3 _______________ -------------

$ l.l85,519.SG
421,555.18 411,992.23
s 342.177.43 1,175,724.84

Maintenance Administration Compensation Claims ______ _
Maintenance Equipment_------------------Shop ______________________________________ _
Less: Shop Billings _______________________ __

202.271.66 202,500.33

6.628.62 3.29.5.07
128.67Cr.

Total Allotments __ --- ___ -------- __ ----- ________ --- ______ ---------------.. $ 1,185,519.86

Appropriation Balance, June 30, 1936 ________________ _

0.00

142

STATE HIGHWAY BOARD OF GEORGIA ADMINISTRATION APPROPRIATION JUNE 30, 1936

Schedule No. 6-E

Af'I'ROPRIATION
For Fiscal Year 1935-36 ----------------------
DEDUCT: [nallotted Appropriation Balanre at June 30, 1936-Closed into Surplus ________ _

$500' 000.00 234' 063.69

Avaihlblr for Allotments

IJEDUCT: Allotments for Year General Administration Division No.1_ _______ _
3 ____ -------------------------

9,608.10 9,382.04 10,424.74

Total Divisions ____ -- ______________________________ $ 29,414.88 General Office_ ---------------- _________ $21l9, 509.17
Less: BluePrint Billings _____ ------------ 93,859.02 $175,650.15

$265,936.31

Compensation Claims __ ---------------- __ Warehouse ____ ---------

3,613.05 13 '580. :35 $222. 258 .43

Other Administration Allotments Research and Analysis _________ -----------Less: Test Billings _______________________ _

$ 26,824.73 26' 748.63

76.10

Collection of Hcvenue ______________________ _ QuarrY------------------------------------

42,181.59 I ,420.19

Total Allotments _____________________________________________ _ __________ $ 265,936.31

Appropriation Balance, June 30, 1936 ___________________________________________________ $

0.00

143

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ESTIMATED PARTICIPATION; ALSO REFLECTING RECONCILIATION WITH REVENUE RECEIPTS
JULY 1, 1936 TO JUNE 30, 1936

Schedule No.7.

Estimated Participation
July 1,1936

Fund Revenue Accrued

State Treasurer

Motor Vehicle Fees_ Fuel Oil Tax _____________

_ ----- ---
----- -----

---
-

-------------

------- ---- $
--- -- ----

......

:1::

Total State Funds ____ _------ -- --- ----------- ------ 1$

1,392,012.38 10,404,393.81
11,796,406.19

U.S. Government

National Recovery Projects _____ ------$ 3,520,347.71 $ 1,336,978.16

Works Program Projects __ -------------- ------------------

1,147,576.33

Other Federal Projects___ _------ ---- ---

23,653.09

1,046,442.72

--( Total Federal Funds_ ---------

3,544,000.80

$ 3,530,997.21
I

Revenue Receipts

Estimated Participation
June 30, 1936

$ 1,392,012.38 10,404,393.81
$ 11,796,406.19
$ 3,038,813.82 354,522.20 327,498.75
$ 3.720,834.77

------- ------------
------- ------- ----
--- ----------- ----
$ 1,818,512.05 793,054.13 742,597.06
----
$ 3,354,163.24

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ESTIMATED PARTICIPATION; ALSO REFLECTING RECONCILIATION WITH REVENUE RECEIPTS
JULY 1, 1935 TO JUNE 30, 1936

Schedule No. 1-0ont.'d.

Estimated

Estimated

Participation

Fund Revenue Revenue Receipts Participation

July 1,1935

Accrued

June 30, 1936

- - - - - - - - - - - - - - - - - - - - - - - - - - - -------~--- - - - - - - - - - - - - - - - - - - -

Other Construction Funds

I

Counties~Cash for Construction~

Prior to Refunding Act _______________ $ Railroads, Counties and Cities, Cash

12,215. 50Cr., ______ _ ------------ --- ----------------$

12, 215. 50Cr.

for Construction__ ___________________

31, 984. 01 i$

6,124.35 $

9,124.35

28,984.01

Railroads, Counties and Cities, Con-

tracts for Construction_____

342. 77

49. 23Cr.

121. 42

172. 12

Total Other Funds _________________ $

20, lll. 28 $

6,075.12 $

9,245.77 $

16,940.63

Miscellaneous Income____________ ____________________________ $

1,442.13 $

1,442.13

Estimated Participation, 7-1-35 ___________ $ 3, 564,112.08

Fund Revenue Accrued _______________________________________ $ 15, 334, 920. 65
1
3 :::i::::::e:~:~~~~~~.- ;-~~~- _ ~~ _~~~~~--- ___________________ -~-- __________________ $

15, 527, 928. 86

Exhibit "A" _________ --------------------[-- _________ ---------[------- _________________________________ $

3,371,103.87

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936

Schedule No. 8

OBJECT OF EXPENDITURE

Analysis (Schedule No. 8-A) A!:::~s-

Analysis (Schedule No. 8-Bl
Construction

Analysis (Schedule No. 8-C)

IAnalysis [cs~~:~~:: (Schedule 1 No. 8-E) No. 8-Dl I Legislative

Maintenance Equipment Transfers

Redemption of Debt

I Total

MEMORANDUM

Net

------ -- -

- r

Expenditures I

Net

! Inter-Depart-

Gross

I Expenditures men=~~i~gs l_:nd::~

Personal Services ................ ;~70,016 25 --;-;~~~; 9~ ~2, 720 ;1- - -~~~=~~-
Equipment Expenses............. 3,354.77 208,258.81 1 423,3(>7 41' . . . .. . . . .....
~ ~~~::~;~ta~~~c~:::;;;~-----~~::::: ...l0,7:l5 08 3,123.23 8,.508-GliS11 '0~~-~~~-

$1,440,442 73 ;1~4~~~:;-~3~

034,980 !l!l
~~:~~~i ~~

034,980
~~:~~~

9~H~'1

163,724 08 $1,604,166 81 4 849 981 639,830.97
860 l21, ~~:~~~ ~!

Heat, Light, Power and Water.... 2,560.07

3,6.51.1i5

1,103 33!

7,315.05

7,315 05j

2,1i22 82: 1 9,937.87

R.ents.. ________________________ l!
Traveling Expenses .. ____________ Supplies and Materials...........

3,638 401
39,511 75. 11,931 41

2,248.32
77,493 52 51!1 3'14 77

ll,113.3:l 1

I

20,650.16 .:.::: :::::--::: ::----------

244,055.83 ___ . _ __ ___ . . ____

12.000.051
137,1i55 43 770,:382.01

1 70 38 01 ~31;2,,.01i0a0~ 04:5<. _

52.00
5,448 IIIli
143,020.97

r12,052.05
143,104 39 913,408.98

Insurance....................... 2,42(> 17

3,559 19

14,83b 36 .... ........

20,821.72

20,821 72

496.3:3

21,318.05

1 ______ 1 1 1 1 ir:~~:!;i~;:~~~~~:-~~~~~~:t~~-~t'-::' ~:;~~ ~!1 98 53 --------~295 _::::::--[::-- -[:::::::::::-- ~-.~~~ ~! ~::~~ ~~~~

--------1 PaymentstoC~ntractors.........

9,170,408 84

1,000 00.. .. . .. . ..... ....

9,171,408.84 9,171,408.84..

"421' 1~:~~! ~!
9,171,408.84

~;!~i:~:"~~;:~:;l~~~:~~s-E~-p-e;,~,~f--2:895 39 ~--15o:~~~ ~~- 408-~ ~::::~j~~:.;;7 ~ ~~:~:: 8t2~~~::~~~~~~- 2~;~~~~- __z.o~o ~~-~~~:~~~ :~

_______ I

I ~-------~

I ~~~~~~2~1~7~2:~107~~8i$1.5_.446.9!0_65

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936

Schedule No. 8-Cont'd.

OBJECT OF EXPENDITURE Tota! Administratirm-Exhibit

Analysis (Schedule No. 8-A) Adminis-
tration

Analysis (Schedule No. 8-BI Construction

I
$2i4,359 58

Analysis

Analysis

Analysis (Schedule

I (Schedule (Schedule No. 8-E)

No. 8-Cl

No. 8-Dl Legislative

Maintenance Equipment Transfers

I

>-'
~ Total Construetion-Exhibit ''C'' _______ _

--:-~S10.74G,251 51

Redemption of Debt

Total Net Expenditures

MEMORANDUM

Net

Inter-Depart-

Gross

Expenditures mental Billings Expenditures

Total Maintenance-Exhibit ''C''

$1,382,831i

Total Equipment--Exhibit "C"

,051.25

Total Legislative Transfers-Exhibit "C"

$110,.5\17 73'

Total Redemption of Debt-Exhibit "C".

Total Expenditures- Exhibit "C".

. ................... [~5_-123~8(l~_G7

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATIVE EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936

Schedule No. 8-A

OBJECT OF EXPENDITURES

General

Inter-Depart- Net General Research and Inter-Depart-

Net

Collection of

Total Net

Administration mental Billings Administration Analysis mental Billings Research

Revenue

Quarry

Expenditures

--------------]-----]-----~ 1 - - - - - j - - - - - ] - - - - - ] - - - - - - - ~--- - -~-~-

Personal Services_____________________ 229,835.53

82,820.31 147,015.22

18,094 59

18,063.99

30.60 $ 21,570.09 $ 1,400.34 170,016.25

Equipment Expenses__________________

3,150.20--------------

3,150.20

1,162.88

971.21

191.67--------------

12.90

3,354.77

Communication Services_______________

16,442.03--------------

16,442.03

11.43

11.43--------------

293.05 __ -----------

16,735.08

Heat, Light, Power and Water_________

2,560.07 --------------

2,560.07

818.63

818.63 -------------- -------------- __ -----------

2,560.07

Rents_______________________________

3,638.40 --------------

3,638 40-------------- __ _ _ _______ ----------- -------------- --------------

3,638.40

:;;: Traveling Expenses_______

19,277.30--------------

19,277 301

2,839 16

2,839 16 _________ ----

20,234 45 ______ -------

39,511.75

oo Supplies and Materials__ Insurance___________________

17,873.20

11,038.71

2,372 17 _________

6,834 49 2,372 17

2,030 03 63 38

1,969 11

60 921

63 38~1 --------------

36 00--------------

48 00

6 00

6,931.41 2,426.17

~~~~:~:~:~~,:~1~:::~~::~~~:~,~,:-:-~-- 3~:::::.:::::::~::~~9-~:-$-~ ,:~:~, ,:~:~1 .~::1. "'"'""IE;.~~- ': : : Printing, Binding, P,Ihlicit_l', etc________

8,705.34--------------

8,705 34

6 42

6 42 __ ----- __ _ ----------- __________

8,705.34

Total Administrative Expenditures-Exhibit "C" ______________ -------------- __ -------------------------------- _______ --------------------------- __ ---------- -~=$==27=4=,=3=59=.=5=8

Schedule No. 8-B STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF CONSTRUCTION EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1936 TO JUNE 30, 1936

Surveys

Construction

Total

Object of Expenditure

Expendi-

Actual

Plans I Total Supervision! Direct

Total

tures

Personal Services____________ $ Equipment Expenses ________

79,417.68 ------------$ 79, 417. 68$ 314, 175. 19 $ 2,253.96 ------------ 2,253.96 3,378.89

Communication Services____

121. 95 ------------

121. 95 l, 180.73

1H1eeantt,sL__i_g_h_t_,_P__o_w__e_r__&__W__a__te_r___ Traveling Expenses __________

----

--------- ------------ --- ---- ---

49.00 -------------

49.00

10,863.85 ------------ 10,863.85

3.87 617.31 63,998.21

Supplies and Materials ______ Insurance ___________________

-

2, 981. 76 ------------ 2, 981. 76 13,498.36 ---- ------- ----- ------ ------------ -------------

Printing, Binding, Publicity,

214, 113. 03 $
202,625.96 1,820.55 3,647.78
1,582.01 2, 631. 46 502,914.65
3,559.19

528, 288. 22 $
206,004.85 3,001.28 3, 651. 65 2,199.32
66,629.67 516,413.01
3, 559. 19

607,705.90 208,258.81
3,123.23
3, 651. 65 2,248.32 77,493.52
519,394.77 3,559.19

Etc._----------------------

98.53 ---- - -----

98.53 ------------- -------------- ----- --------

98.53

Payments to Contractors ___ Special & Misc. Expenses ____

- - - - - . - - - - - -

--

21,406. 66$

--- ---- - ----- ------- ---------- 93,215.91 114,622.57 30,337.02

9,170,408.84 5,349.16

9,170,408,84 35,686.18

9,170,408.84 150,308.75

-~---~-
Totals ___________________ $ 117, 193. 39 $ 93, 215. 91 $ 210,409.30 $427,189.58 $10,108,652.63 $10,535,842.21 -- ----------

Total Construction Expendi-
tures-Exhibit "C"________ -------------- ------------ ------------ ------------ -------------- -------------- $10, 746, 251. 51

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF MAINTENANCE EXPENDITURES BY OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936

Schedule No. 8-C

OBJECT OF EXPENDITURE

GENERAL MAINTENANCE

RECONSTRUCTION

SHOP

- - - - ______ ,_ _ _ _ _ - - - - - - 1 - - - - - - - - - - - - - - - - - - - - - - -

Supervision

Direct

Total

Supervision Direct

Total

Shop

Inter-

Net

Departmental Shop

Billings

Total Net
Expenditures

Personal Services ___________________ $ 31,776.28 576,264.04 608,040.32 1,394.19 $ 53,286.07 S 54,680.26 $ 62,839 78 $ 62,839.78------------

662,720.58

Equipment Expenses________________

182.60 396,942.23 397,124.83

1.00 26,241.58 26,242.58 3,878.77 3,878.77------------

423,367.41

Communication Services_____________ ~ Heat, Light, Power and 'Vater_______ 0 Rents_____________________________
Traveling Expenses_________________
Supplies and Materials______________

6,026.53 57.60
577.50 13,971.72 1,987.77

2,444.77 1,036.27 4,664.56 5,236.09 80,684.71

8,471.30

11.50

1,093.87------------

5,242.06------------

19,207.81

835.45

82,672.48

24.79

25.81 9.46 871.27 606.90 161,358.56

37.31 9.46
871.27 1,442.35 161,383.35

848.69 1,804.19
52.00 2,609.801' 130,019.15

848.69-----------1,804.19------------
52 00-----------2,609.80-----------130,019.15------------

8,508.61 1,103.33 6,113.33 20,650.16 244,055.83

Insurance__________________________

180.00

14,656.36

14,836.36 ------------ ------------ ------------

432 95

432.95 ------------

14,836.36

Printing, Binding, Publicity, etc______

2.24

Payments to Contractors ____________ ------------

Special and Miscelhncous Expenses__

32.36

1.20 1,000.00
8.00

3.44

3.68

5.83

9.51 ------------ ------------ ------------

12.95

1,000.00 ------------ ------------ ____________ !____ ------- ------------ ------------

1,000 00

40.36

427.88 __________ _

427 88~-

15 00

15.00------------ --~8__~

TOTALS ______________________ $ 54,794.60 $1,082,938 231 $1,137,732.83

2,698.49 ~=-=2_:_~:_~~ $245_:_~3_9j $202,500.33 $202,500 331 ____________ --------------

Tom' M~oo E.,oW'"" E.hlhl' "C"-------- ____ ___ ____ _ ___ ____________ ---- ___ 1___ ___ ____ ____ ____ ___ ___ _ __ ____'___________ ! ______ ::_:~-~;"i;O"io

Schedule No. 8-D

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF EQUIPMENT EXPENDITURES, BY OBJECT CLASSIFICATION

JULY 1, 1935 TO JUNE 30, 1936

. ~I I

======;===

Total

Object of Ex- Adminis- Construe- Mainte- Expendi-

penditures

tration tion

nance

tures

- - - - - ---~- - - - - - - - - - - - - - - - - - -

::--Tractors _ - -

----1$ 2, 118.97-

----- $ 2, 118.97

----- .$ 2, 575. oo 2, 575. 00

Road Machinery, Misc. :

1, 132. 561

207. 81 1, 340. 37

Office Eqmpmell:t _ $ 1, 160. 79

33. 35 _

1, 194. 14

Engineering Eqmpment _ _ _ _ ___ _ 1, 241. 90

I
2, 318. 90 ____________

3, 560. 80

Laboratory Equipment 261. 97l - ___ - -]- __ - ______

261. 97

- - - - - - - - - - - -------~------

Totals_____ _____ $ 2, 664. 66 1$ 5, 603. 78.$ 2, 782. 8L __________ _

[====' == ==1=----
Total Equipment Expenditures-Exhibit "0"______ $ .11. 051. 25

1

Schedule No. 8-E STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF LEGISLATIVE TRANSFER EXPENDITURES
BY OBJECT CLASSIFICATION JULY 1, 1935 TO JUNE 30, 1936

Object of Expenditure

I Motor

Convict

Vehicle

Farm

Total Expendi-

License

tures

Tags

- - - - - - - - - - - - - - - - - - - - - - 1 - - - - - - - - - - -

Special & Miscellaneous Ex -1

I

penses Transfer of Funds ____ $ 57, 822. 73$ 2, 775. 00 $ 60, 597. 73

Totals

____ ~~y7,~~~~$-2,775.00 - - - - - -

Total Legislative Transfer Expenditures-Exhibit "0'- - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - -- - - - - - - ----- -- $ 60. 597. 73

151

Schedule No. 9. STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF EXPENDITURES BY CONGRESSIONAL DISTRICTs

JULY 1, 1935 TO JUNE 30, 1936

==--

(Analysis) (Analysis) (Analysis) (Analysis)

(Schedule (Schedule (Schedule (Schedule

Total

- - Dis- No. lO-B) No.lO-C)
tricts Construe- Surveys tion

No.lO-D) No.lO-E) Mainte- Recon-
nance struction

Expenditures

No.1 $ 1,129,438.22 $ 14,260.92 $ 100,982.32 $ 20,546.34 $ 1, 265, 227. 00

2

712,579.08 16,242.30 97,156.83 12,539.20 838,517.41

3

833,148.87 12,026.31 88,380.98 49,428.32 982, 984,48

4

674,145.77 16,084.38 79,929.56

238.19 770,397.90

5

649,353.69 25,099.10 20,948.49 2,655.58 698,056.86

6

874,513.55 17,221.07 93,291. 39 22,678.33 1, 007, 704. 34

7 1,088,019.90 20,787.53 79,579.23 55,927.73 1, 244, 314. 39

8

660,977.80 9,755.33 96,298.63 2,773.01 769,804.77

9

773,551.35 23,778.37 118,296. 31 1,185.41

916, 811.44

10

360,108.46 13,892.14 92,463.75 7,025.79

473,490.14

11 1,054,201.20 19,375.32 148, 105. 10 45,973.83 1,267,655.45

12 1,725,804.32 21,886.53 122,300.24 24,132.24 1, 894, 123. 33

-----

Totals $10,535,842.21 $210,409.30 $1,137,732.83 $245,103.97

Total Expenditures Distributed by Districts' ___________ $12, 129, 088.31

Undistributed by Districts Adrninistration General Office _____________ $187, 368.42

Warehouse_--------------- 13,547.32 Divisions ___________________ 29,513.22

Research__________________

329. 79

Collection of Revenue_____ 42, 181. 59 Quarry____________________ 1, 419. 24 $

274, 359. 58

Land,Buildings&Equipment Legislative Transfers
Prison Farm Purchase_ ___ 2, 775. 00
MotorVehicleLicenseTags 57,822.73

11,051.25 60,597.73

Redemption of Debt Refunding Certificates____

2, 648, 765. 80

Total Expenditures Undistributed by Districts _________ $ 2, 994,774.36

Total Expenditures-Exhibit "C" _______________________ $15, 123, 862. 67

152

Divisions

(Analysis)
(Schedule No. lO-B)
Construction

Div. No. L ____ $ 3,310,587.03 2_____ 3,865,253.97 3_---- 3, 360, 001. 21

Totals_____ $ 10,535,842.21

ST.A.TB mGBW.A.Y BO.A.B.D o:r GIIOB.GIA

llohedule 11lo.10.

SUMJII.AB.Y OF EXPENDITURBS BY DIVISION UNITS

JULY 1, 1936 TO JUNE 30' 1936

(Analysis)

(Analysis)

rAnalysis)

(Analysis)

(Schedule

(Schedule

(Schedule

(Schedule

No.lO-C)

~o.lO-D)

No.lO-E)

No.lO-F)

Total

Surveys

Maintenance Reconstruction Administration Expenditures

------

$

61,063.97 $ 387,990.15 $ 126,317.61 $

9,669.67 $ 3,895,628.43

62,769.91

409,420.16

58,535.39

9,375.30

4,405,354.73

86,575.42

340,322.52

60,250.97

10,468.25

3,857,618.37

- - --~------

-----~~~~-

$

210,409.30 1$

1,137,732.83 $

245,103.97 $

29,513.22

Total Expenditures Distributed by Division Units_ - -------- --------- . ---- ------- ----- -------$ 12, 158, 601. 53

:;; Und1stnbuted by Dlv.is.wn Uruts

w Administration General Office_________ ______ __ _________________________________ $

Warehouse ______________

______________________ _

Research______________ ____ . ______________________________ _

Collection of Revenue__ ___________

_______________________ _

Quarry ____________________________________________________ _

187,368.42 13,547.32
329.79 42, 181. 59
1,419.24 $

244,846.36

Land, Buildings and Equipment __________________________________ _
Legislative Transfers Prison Farm Purchase ___________________________________________ $ Motor Vehicle License Tags ____________________________________ _

2,775.00 57,822.73

11, 051. 25 60,597.73

Redemption of Debt Refunding Certificates ______________________ _

2,648,765.80

Total Exp.mditures Undistributed by Division Units _____________________________________________________ $ 2, 965,261.14

Total Expenditures-Exhibit "C" ------------ ______ .. ______________________________________________________ $ 15, 123, 862. 67

UNIT

Schedule No. 10-A.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF ADMINISTRATION EXPENDITURES BY UNITS

JULY 1, 1935 TO JUNE 30, 1936

Personal Services

------~-----,~~~~~------====~----

!

I Communi- Furnishing!

I Equipment; cation Heat,Light,

Expenses Services Power and

Water

Rents

Supplies

Traveling

and

Insurance

Expenses Materials

Printing, Binding, Publicity,
etc.

I
Special lndemni- and Mis-1 Total
ties iI cellaneous 1 Expenditures
i Expenses
~-- - - - - - - - -

GENERAL OFFICE

Commi,iooers --------- $ 30,fiiG.IO, ____________________ ---------- ___

$5,751.79----------.... ---------- ___

$ :lll,:ln7.89

~~~~~~~:;~~~ndc:~;'::..~::::::::::: ~~:!~~ ~~::::::::::: ::::::::::1::::::::__ ---------- 3,~~~ ~~ :::::::___

_______:_:_:_]-_-_-_-_-_-_-_-_-_-_ ~~:~~~ ~~

: : : : : : : : : : ::::_: : : : : : : : : : : : : -: : : __: : : : : : : : : Plansfor Bridges.________________

18,792 90 __________ ---------- _

1

i:~:~~~~;~;:::-:::::::::::::::::::. :~:m ~~~-:::::::::

2,499.50---------- ____
-:;:~;~:~~

21,292.40
:~:i~u~

z~~~~:::~~~~::~-~~~:r~~':::::::::::j--;:;;;-;;],l-$2:;o8.i3 $io:229"45 ;;;:476"47 "i:l:o6o-9o -- i2o-20 $14:o85 23-$1,032 001 3:091 37 $!~:~!! ~~ ;z:4i;5-88 !~:~!! ~:

TOTALS ______ -------------- --;204,873 35 -$~, ;;-;-; ;;0,229 451--;2~:;:;;:;:; -;OliO ; ;;~~~ ;;~08.5 ;; --;~~;-~;r-;;-705 ~~~;~~~ $;~~~;-;~$ 281,22;-~

Less: Blne Pnnt BIIlmgs___________

82,820 31

______

----------

----------

----------

----------

11,038 71

-1-- _
_____

__

---: _ ______ 93,859 02

TOTALS... __________ -------- ~~ 0~ ~2,1~8-1~;;0~2~9 4~ $2,4~6 47 ~3,_0~ ~l$14,60.;-::~~--;0~11 $1,03;-;:--;8,7~5 ~:;;~~~~~~~~~~~~~~368 ~

1

WAREHOUSE_ ______________________ $ 9,915 73 I $ 574 13$

279 94 $

32 oo __________ 1

$

975 351 $1,370 21r

$

21 00

______

l __________

I
l

$

378 01 1 $ 13,547 32

I

I

I

1

I

I

- -- _I____ --

UNIT
~-- DIVI;IONS -

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF ADMINISTRATION EXPENDITURES BY UNITS

JULY 1, 1935 TO JUNE 30, 1936

I

I Communi-1-Furnishlng 1

I ~ II- suPPlies I

I Printing,

1 '

Specia\

'1

1

Personal Eqwpment cat1on Heat,Light,l Rents 1

Traveling 1 and

1Insurance 1 Binding, 1 lndemni- 1 and Mis- \ Tota1 1

-1----1 --- Serv1ces I Expenses Serv1ces I Power and
-~I----- ---~-~ - Water

Expenses I Materials 1
-~ I!

1 Publicity, 1 ties 1 cellaneous Expenditures

1

1

1 Expenses 1

II etc.

1 1

Number One _____________________ $ 4,382.26 . Numlwr Two ____________________ l 4,442 .10 Numhcr Three ___________________ ' __"__2_21 GOj1

SO $2,10\1 28

19.60 $ 577 .50 $l,:l67.:l5 722 841

Sli Gli 2,428 31 _________ I

I 1,128 25 887 921

380.48 J,:l\15 05

32-~i--~~~~--j 1,200 ~ __ 806D5

4Rh 04 401 iili 1 4:31 47

\)' 61\\l. !)7 !l,:l7.1 .:HI 10,46K 2!>

TOTALS . . ~---------------

~ _, 15,046 45: $
I

467 94l $5,932_1).j

511i0 $ 577,50 $3,696.21

-

-~------

1

$2,417 71 $1,31\1.171 _____ _

1

-

I

I

4001 $ 2!1,5t:l 22

....., TOTAL GENERAL

I

0' 0'

Administration _____ ~-~-----

_ $147,01.5 22 $3,150.20$16,442 03 $2,560 07 $3,1\38.40$19,277.30 $6,8:14 49 .~2.372 1] $8,705.34$17,584\15 $2' 848 79: ~2:l0' 428 !i(i

1

1

=--~- -11~4:~.:~ 818~3 =~-~-~ 9---~-6-~~1,91\9 RESEARCH AND ANALYSIS
Diyision of Hescarrh_ ____________

19l.G7 _________
1

$~8-1\3 =-= -;~;~~ ~2 TOTALS._________

____ $ 18,0\14 .1!11 $1, Hi2 88, $ 11 43!

_s_-z_-=_,8_3_-

11 GO.D:2
OlO O.l l

I
(j:) 38

6.42

IJ:l 38 $ ti 421

$2,005 $ 21i.748.1i:J

46 GO

.'32!1. 70

~ - --,-$-2,11;1 !101 27,078 42

Le;,; Test Billings______________ 18,008 U!l 971 21

11.43 818.1i3 __________ 2,83!1 Ill 1 96'1 II

b3 38

6 42 ~---~-j 2,00.1 :Joj 21i.748 G:l

COLLE1C\:~-~~s~~-~-~~~-~~-~-- -----,~ ~-~ ~1 ~--~~-~~ -~:_-~~~~ =--~~ ~-- ~----~~~~ ~~ ~2 _ -~~~~=-- _ _ _ _ u~~~$ -32~-79 _- 30 $

67

1
7,0 1

I . --- 4G

~20,234 1 -~---~,=~~-~--~-- 42~1:1-: Enforcement of Revenue Laws_____ $ 21,570 0\1 __________ $ 293 05 ______

1
=- - -- - T-; -----,- QUARRY ----------------------- ~~- 1,40~;:-.$-;1-;;;; .

~~
-,-------

_

4.\ $

------

:ll\ OOi $ 48.00 ____

-S

-~~-00

~!~~=~~~ ~~~~~~- -~ -;~;;-;~

---

-------~--~-

TOTAL ADMINISTRATION_

2 .m~o11; z:,~3,:4 ":!6.735 o8 $2~5 oo:,~~G:s4oe~:~ 75 $G.!J31 41. $2,426.1i $8,705 :34$17,584 o.1i:2~8~5-3.~l $274,:l,i9 ..s8

--

---~-------

STATElHIGHWAY BOARD OF GEORGIA ANALYSIS OF ACTUAL CONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936

Schedule No. 10-B.

Personal Services

Equipment Expenses

Communi .. cation Services

Furnishing Heat, Light, Power and
Water

Rents

Traveling Expenses

Supplies and
Materials

I
1

I prm. .tmg,

Insurance Binding,

Publicity,

Etc.

!

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

CONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS

District No. )__ _____ I $ 31,143 79i $ 655.80

2_______ 20,834.34 ------------

......
Ol 0>

3 _______ 4 _______

25' 287.461 23,048.93

120 63 205.18

287 751 - -138 251 _________

24.00 80.00

94 42 ---- ---- ---------22 431 -- - --- 161.00

6,951.27 4,870. 72 5,482. 94 5,414 50

, mii

I i

11~ !1 1! El~

5 _______
6.. ____ 7 _______

16,526.58 25,282.09 36,482.46

197.21 193 36 471.38

:; ~~i::::::::::::

138.52 $

3.87

20.00 90.00

2,200 73 5,158.45 6,074.56

699 64 ----------'--- ------------------- 1,481.17 931.57----------- ---------------------- 2,744.441 1,347.75-------------------- -------------- 3,123.47

21,14105 34,326.91 47,732.01

8 _______ g _______ 10 _______

19,686.99 30,669.01 15,274.85

202 18 413.24 65.41

82.33 ------------

31.31

100.45 ------------ ----------

47.79 ------------

89.50

3,576.71 4,373.00 4,206.87

1,239.93 ---------- ---------- -------------814.73 ---------- ---------- -------------658.07----------------------------------

2,087.48 2,169.25 1,426.01

26,906.93 38,539.68 21,768.50

~~~314~1~:;~~-$-3-,;;8-~~-$-1-.-1-80-73-ll-$ :::_:~~:~::_~~~:~:~:_::::/;;:~:; ~~~ ~~~~~~~: 11_______
12 _______ TOTALS ________

26,346 80 43,591.89

173 37 681.13

150.32 ------------ ---

5,532.69

85.75 ------------ 121.50 10,155.77

1,316.98-------- - ---------- -------------- 2,806 541

_ _ _3_.8_7+_---6-17-31 $ 63,998.21 $ 1::::: :: : ___

36,326.70 ::

1==1==-=1=~1=====l===i===l===-=(=-~-=---(=~~-----~1==~1====

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ACTUAL CONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936 -

Personal Services

Equipment Expenses

Communication Services

Furnishing Heal, Light, Power and
Water

Rents

Traveling Expenses

Supplies and !Insurance
Materials
I

Printing, Binding, Publicity,
Etc.

Special \

Payments to and Mis-

Total

I Contractors cellaneous Expenditures

l Expenses

CONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS

"",.....

District No.

L ______ 2 _______

$ 24,732.28 11 '819. 89

$ 24,965.57 I $ 15,177.041

180 961I $
190.23

!.50 $ 150.641 $ 191.07 187 00

-1

3_______ 1,643. 60

928 44 ------------1------------

522.56 $ 57,413.95 $ 418.95 ---------102.78 41,477.51 26.25 ---------19.45 10,043.05 ---------- ----------

4_ ______
5 _______
"-------

13' 718.21 490.31
10,432.38

21,019.10 355.43
9,561.31

254 26: 15.50 68.85

782 17 52.94 613.50

128.00

289 05 36,821.41 229.45 ----------

20.00 ------------ 3,227.60 ---------- ----------

5.00

5.50 31,248.11 229.45 ----------

7_ ______ 24' 800.21 18' 430.68

167.49

8_______ 5,661.19 2,802.02 ------------

613 05 1.00

464.09 25.00

184.15 62,684.76 244.21 ---------27.30 3,595.30 ---------- ----------

9 _______ 10 _______ 11 _______ 12 _______

49,156.20 910.15
39,794.08 30,954.53

40,912.87

209 02

20.25 239 33

2,710.19 ------------ ------------ ----------

30,438.96

314.27

680.17 166.80

35,324.35

419 97

692.13 196.15

270.92 81,895.21
18.85 ------------
527.17 97,979.31 663.73 76,528.44

949.77 ---------181.43 ---------501.11 ---------778.57 ----------

976.786.75 $ 125.80 $1,085,298.96

613' 898.69 998.59 684,069.05

786,829.43 ----------
567' 828.85 977.05

799,463.97 642,047.55

624,050 02

.84 628,212.64

787,567.89 454.65 840,186.64

932,068.23 631.02 1,040,287.89

621 '959 .06 ---------- 634,070.87

560,898.71 459.39 735,011.67

334,519.34 ---------- 338,339.96
846,980.69 49194 1,017,874.50

1,517,021.18 1,209 88 1,663,788.93

l----1.----l----l----l----------------------------------

TOTALS________ $2=14=,=1=13=.0=3'l=$=20=2=,6=25=.=96=l==1=,=82=0=55 = 3,647. 78 $1,582.01 S 2,631.46 $502,914.65 $3,559.19 ---------- $9, !:0,408~~ ~5,349 16($10, 108,652.63

Did;-;ion No. l __
TOTAL~

Schedule No. 10-B-Confd.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF ACTUAL CONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1. 1935 TO JUNE 30. 1936

Personal Services

~ 1 Communi- Furnishing Equipment I cation Heat, Light, Expenses Services Power and
__! _ Water____,_

Rents

----

---- --

Traveling Expenses

II Supplies and

nsurance

Materials

I, ------

I Printing,]
Binding, Payments to Publicity, Contractors
Etc.

Special
and Mis-
I cellaneous
1
Expenses

Total Expenditures

CONSTRUCTION SUPERVISION BY DIVISION UNITS

I $ 95.017 29
101. zso zo 1
1
1!1,2i770

532.97
1,443 09
1,401 s:l

711.63 ---10.5 06 364 04 $

n 1
$314 175 !9 $ 3,378 89 $ 1 180 $

------1--= --: - - -I -

- --I-=

$ so oo, $ 19,078.50 $ 4,499 49 1~----------1---

. .l$10,185 li:l

390 oo: 27,854 34 1

4,6li0 40. _________ 1 __________ ----- ________ I 10,490.54 1

3 87,

1
141311 17' 065.371 I

4' 338.38 ------ --- ---
I

9 ,G54 .8.1 _______ 1

;-;;-;-";;;/~ ~3.~;;;;~-;~3~498.36 ~~~~~

---~--~~~337.02

130' 700.51 !52' 235 72 144,247 35
427.189 58

Division No.1 _ ---~ $ 50.975 911 $ 42,844.38'

2__ -

77, 462 88 !J7, 28:~ M-l

-~tl741~; _ _(J2,498 05,

TOTALS.

I

I

$214, 113.D:l $202,()25 96

CONSTRUCTION DIRECT BY DIVISION UNITS

512 501 li!G.04
:H/2 01,
I
!.8~~~.r

874 10 2,086.44
687.24
I

398.80 434 791 748 42 1

3,047 78, ~1.582.01 I

781.751 $143,456 111 $ 527.3G ----------~ $2,9:32,111!1.001 $1.490 531 $3, 179' 880 ..52
1 ,:367 34, 208,0.55.1i7 1,8~7.85 ---------- 3,:320.8011.33 2,7ti7.381 3, 71:3,018.25

482.37 151,402 87 1,1[13 98---------- 2,1117,.583 51, 1,091.25' 3,215,753.80

- - - I____

2, li:ll 41i $502.914 65 g3 .55\! 1[1

'

I

- ----

--

'

-!

$9,170,408

I
84

$5.34!1

Iii ' $10, 108,1i52. U3

Personal Services

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936 -

-oolllleMo.1~

Equipment Expenses

Communi- Furnishing I
cation I Heat, Light,
Services Power and Water i

Rents

Traveling Expenses

Supplies I

I Printing,

Speciql

and

Insurance Binding, Payments to and Mis-

Total

Materials

Publicity, Contractors cellaneous Expenditures

Etc.

Expenses

I I - - - - - - - - - - - - - - - - - - - - - - - - - - -

SURVEY ACTUAL BY CONGRESSIONAL DISTRICTS

~ District No
<::11
~

2_______ 3_______ 4_______ 5_______ 6_______ 7_______

ws9_:_:_:_::::li
11_______ 12_______

""' I s 4, "" .45
8,790.81) 3,627.52 2,105.50 4,623.1)7 5,666.10 7,935 09,
4,571.531 10,838.62
li,453.87 8,560.68 11,407.79

80.53 141 34

10.181-13.17--

19 93 112. o3,

14 li2 --
1. ssi

90 03

6.00 ----

198.28 -----------

lI:,:::''~"~"J

159.27

7.59 -------- I

_I

25.01

7.49 --------

670.94 138.34

17.43'._______ ___

___

10 401 __ - ------~-- - -

217.80

15 93 ----

- --------

400.41i

17 5[)

--- ----------,.

924.44 1,015 09
71l0.25 1)09.12 613.19 800 95[ 79.5 Oiil 554. 75 951i 09
1,076 72 1,208 99 1,549 20

203.831 __
268 94, 2:)7 .15 ----

I ___ I
:c::::::l

:1:::::::::

178 091---- I ------1

$4,875.00

145.37 ---- -- $ 7.111 ------------- 14,004.10

324.43 ------ --- __________ :_____________ _ 20!l. 92

258.84- -------- ---------- --------------

123.50

144.24 ---------- 321.32 ____

91 42 ___

1,882 48

19.5 30, ------- ------

-- --------- 311.66

283 541____ ---- - ----- ------------- ------ ---[
420 711 - -- -1---- - ___ ,__ --------- ----------

.5,995 43 10,254 40 4,1i59.47 7,[)65.29 19,489 47 7,199 .liS [),279.35 5,30:J.02 14,778 :lO
8,18ii 29 10,286 94 13,795 7.1

!~----
TOTALS ___ ---~.!2~~~6!=~ 2,253.9G

1;1-~~~-~~---- i ~~-49~~~~ ~0~~63~~! _0~~~ :~:~-~~~- 2~-~ =-~---~~--~~~~~406_6~~~=~~1~~~

-- ---------- - - - ----------

I I I - - - - - - - - - - - - - - - - -

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936

Schedule No. 10-C-Cont'd.

I

Personal Services

I

Communi-
I Equipment cation
Expenses I Services
I

Furnishing I Heat, Light, , Power and
Water

Rents

Traveling Expenses

Supplies

I Printing,

and

Insurance Binding,

Materials

I

------

I Publicity, Etc.

Payments to Contractors

Speciql and Miscellaneous Expenses

Total Expenditures

SURVEY PLANS BY CONGRESSIONAL DISTRICTS

"'1---1 District No. !_ ______________________________________________________ I____

0

2_______ ____________ ____________ ____________ _

I

3_______ ____________ ____________ ____________ ____________ __

4_______ ____________ ____________ ____________ ____

J________-__-_- _[- - __ --_--1~ __1 _ _ ____________

_

_ _

-:-_: -:-: _

_ _ _ _ _ -_-1 -_-_j -:_-_--_____ -_____

$8.265.49 5,987.90

_::::::::r::: ______ :__ I
:-1 - ::::::::::::: :_:::: ::_:::::::

1

_

7.366.84 8,119 09

8. 265.49 5,987.90
7,366.84
8,119 oo

5 _______ ------------ ------------ ------------ ------

- ------------ ------------ ---------- ---------- -------

.5,609.631

5,609.1i3

6_______ ------------ ------------ ------------ ------------ ---------- -------- --- ------------ --

- ---------- ------

10,021.391

10,021.:39

7 _______ -------------------------------------------- ---------------------------------------

------------------------ 11,508.18i

11,508.18

8_______ ------------

- ------------ ------------ ---------- ------------ ------------ --

4.452.31,

4,452 31

'"'J i ~~c~~~~~~~~ :-~~~l ~~~~~~ ~~~---~<~;~~~;~!~ B!~!

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936

Personal Services

Equipment Expenses

Communication Services

Furnishing Heat, Light, Power and
Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

SURVEY ACTUAL BY DIVISION UNITS

77~----------1----------1-------------- :;; Division Xo. 1. ______ 1 $ 29,202 16

-----------1 586 771 $ 66 791

S 25 001 S 4,122 061 $ 1,068

---------- 35,071.55

......

2-------1 20,104 48

620 361

15 551____________

24 001 3,fi68 68,

974 241 __________ ---- --------- --------- $5,396 58

30,803.89

1------------------------ ____ 3_______ 30,111 04 1,046 83

39 61 ____________ ----------

3,073 111

938 751 _______ -1 $ 9S 53-------------- 16,010 08

51,317.95

---]~---- I_ _ _ _ 1_ _ _ ,_ _ _ 1_ _ _ _

TOTALS ________ $ 79,417.68 $ 2,253 96: S 121 95!------------: S 49 00, $ 10,863 85 $ 2,98176 1__________ 1 $ 98 531-------------}21,406 66 $ 117,193.39

1

1==~-~~~~~=~====1====1=~==1==1~-~~=1===1=1='==1==1-----

SURVEY PLANS BY DIVISION UNITS

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENER~L MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936

Schedule No. ID-D

Personal Services

Equipment Expenses

Communication Services

I Furnishing
Heat, Light,
Power and I
Water
I

Rents

I

!

I
I

Supplies

I Printing, I

Special I

Traveling

and

Insurance Binding, Payments to and Mis- 1 Total

Expenses Materials

I

I

I I Publicity, Contractors cellaneousl Expenditures

Etc.

Expenses

-~

----

- -- -

MAINTENANCE SUPERVISION BY CONGRESSIONAL DISTRICTS

>-' District ~0. !_ ______ 5

"""'

:L _____

2,5118. 7)s 2,891i.0.5 1 2, 649.661

22.75 $ 11.41 17.39

481.55 $ li:l6.06 509.05

1.26 $ 4. 92 I. 92

61.80 $ 151.20 i12.34

1,070.62$ 1 ,236. J:l 1,091.42

174.06 $ 182.37 157.77

15.02 15.69 $ 2.24 J:l. 91 ---

L 5 ____

2,315.15 639.29

24.94 2. 75

388.30 155.38

1.05 -2.66 -

943.53 325.15

184.36 243.61

12.151 ____ 4.00 ---

ti.. L ..

2,4111.64 2,28:3.81

25.71

430.41 445.76

1.40 ---------9.50 ---

990.65 1 '166.11

208.07 62.07

13.63i----14.321 __

g__ ___ 10.. _____

2, 6;"7 .2:1
3,:342.36 . 1
2.41iG. 76;

2.51 26.81

469.12 600.77 422.58

10.28 --~-----1:l.i14 __ 1.17

1,368.42 1,657.34 1,002.22

7ii.45' 70.61 204.22

16.66-20.96 .. 13.52--

1L

4.225. 70

IG.47

904.\JO

8.42 220.68 1,800.02

174.44

22.641;.._

-;~~~~~~~;-=~~~~~~~~~~~~~~~~~~1~~~~~~~~~~~-~~~ 12..~----
TO'L\LS __

3,261.84

31.86

582.65

1.08

51.48 1,320.11

246.74

17.501----------

---~-------- --~~------ $ --- $ 4.81
I 7.95 'n
-- -- 6.54
I

4,425.79 5,140.88 4,541.41 3,871.59 1,372.84 4,089.51
3' 981.57 4,623.67 5, 712.52 4,137.28

----
-I

2.01

7,375.34

8.94

5,522.20

-;---~-. -~~

r$ :J2.36!$ .54.794.60
_,-~ _____ /~ - - -
I ~---

STATE HIGHWAY BOARD OF GEORGIA

Sehedu\e No. \G-O..Con\'4.

ANALYSIS OF GENERAL MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1935 TO JUNE 30, 1936 -

Personal Services

Equipment Expenses

Communi~
cation Services

Furnishing Heat, Light, Power and
Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing, I Binding, Payments to
Publicity,] Contractors Etc.

Special I
and Mis-

Total

cellaneousl Expenditures Expenses

MAINTENANCE DIRECT BY CONGRESSIONAL DISTRICTS

~----------c----------,-------,--------,----------------
1

-----

,_.. District No. ]_______

~

2_______

48,364.01$ :Hi,342.211$ 45,181i.371 37,353.87,

203.661$ 267.581

6.09!$ 162.50 S 155.431 232.72

440.971.$ 9,743.54 $ 1,29:3.151_ 711.74 1 6,744.951 1,:Hl2.:lll' __

96,556.53 92,01.\.95

3.--

45,042.801 :ll,500.42,

226.36

74.61i 162.711

461i.21 5,143.921 1,220.64--

4___

42,329.58 24 o38 34

143.26

uo.o:JI

57.oo

2n.22 6,183.62 t.o.\o.92 __

1.85

8:3,839.57

76,057.97

5_.

13,680.00, 4:075:4811

45.241'

22.32 200.44

91.44 1,168.21 292.521 __

1!!,575.65

6___

47,079.021 31,946.92

189.16

t:J2.80 1 134.34

205.07 8,405.98 1,108.59--

8[1, 201.88

'--8____

:l7,447.37 31,559.461 ,\3,586.28~ 29,824.38

166.09 188.o:l'l

80.11 8!!.33

803.80 531.58

373.15 :J98.90

4,056.77 1,020.91-5,857.Y2 1,195.54-----

75,597.66

3.00

91,674.96

9_______ 63,529.15 40,450 ..\3

242.94

117.:ll 7:34.20

504.851 5,519.5[1 1,485.22----------

112,58:3.70

10____

43,320.02 34,542.7[1

153.09

36.80 445.87

213.28 8,489.99 1,123 43$ 1.20-

88, :J26- 47

ll____

75,549.94 5!,171.811

388.771

84.281 680 40

978.02

1 9,!J14.5811,flfi0.5:l 1__ -----------[---_-_-_

43 140,729.76

- ---------- 12____

61,140.50 43,236.02

230.59

!68.11 42fi.OO

575.24 9,455.64 I 533.60 _ _

-----~1--~,- -~---~--- 1 -~

116,778.04

1 TOTAL~--- --- ~,~~-~~~~3:G.::::~~~~4~=i~=~036,: ~6;5~~~~[;!:o~:$~~~. ~:$:4_,;65:::$ ~ 2~:$=- _~-~~. O~j:__ ~0~$~~08::l8~=

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10-D-Cont'd.

ANALYSIS OF GENERAL MAINTENANCE EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UN ITS

JULY 1, 1935 TO JUNE 30, 1936

Personal Services

Equipment Expenses

Communi~
cation Services

Furnishing Heat, Light, Power and
Water

Rents

I Supplies

Traveling

and

Expenses Materials

Insurance

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

MAINTENANCE SUPERVISION BY DIVISION UNITS

...... ~ Division Xo.
2_
3

___ Is

5)$ ll,o6o.Js
ll.121.4:ll_
----,--- ---1,------ -:-----,- -:---- 9,594.85

1-4--:36J..20J~ s 2.75
--

2,350.47'
1.887.53 _ 1,788.53

17 Bois 577

_

__ __ _

I

4o.oo 1

___ _

1- - -

4,729.J$

528.Js 6o ools

s s 2 24 __________

6.82

19,377.02

4.363.72! 4,878.15

1.002.75l 456.13

6600.0o0o 1__ ____________

_ __

_______ _ _____ _____

19.00 6.54

18.590.63 16,826.95

----- ------,----

------ -----;------

TOTALH. ----- $ 31,776.281$

182.60$ 6,026.53,$

57.60$ 577.50,$ 13,971.72,$ 1,987.77,$ 180.00$ 2.24,-------------- s 32.36$ 54,794.60

===l~====l======l_====r==r===i====r====l===l====l='==:====

MAINTENANCE DIRECT BY DIVISION UNITS

DiviRion '\o. ______ $ 1!15,581.19 $ 1:33,106.741$ .025.13$

------~-$ 296.38$ 1,075.S:ll$ 2.739.411$ 29,520.48!$ 5,255 ..221 ...... ./ .

3.7~$ :368,613.13

2_

199,510.34 149,172.69

72!1.88

404.09 1,14S.41if I,OII.I:l[ :J2,7:l2.5!1; 5,117.90:$ 1.20 $ 1,000.00

1.25 390,829.53

181,172.51 114,662.80,

{i89.i6

3:35.80 2,440.27, 1,-18.1.5.11 18,422.641 4,28:!.24/--- ----!1--------------

3.00 323,495.57

- - - - - - - - - - - - - - - - - - - - - - - - --~------~------.--------~-----------------

TOTALR_

__ S 576,264.04$ 396,942.23 S 2,444. 77,S 1,036.27 $ 4,664.56 S 5,236.09$ 80,684.71 $14,656.36 $

1.20$

1.000.00/S

1

1

==,==,~~===r=====,=== ,====r==--~=====,====1=~~--,

8.00 1 1.082,938.23
l 1

---------~----~----~----~------~--~------~----~--~----~------~----~-------

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936.

Personal Services

Equipment Expenses

Communi .. cation Services

Furnishing Heat, Light, Power and
Water

Rents

Traveling Expenses

Supplies and
Materials

Insurance

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

RECONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS

Dbtrict No.

~::::::: 1__ _____

1

$ 453 011 ____________
::::::::::::1::::::::::::

1

$

3 00

::::::::::::

------------1----------
:::::::::::: ::::::::::

$ 258 941------------~----------
:::::::::::: :::::::::::: ::::::::::

$ 2.45--------------
:::::::::: ::::::::::::::

-

-$

-

1~~----

-~-~

717.40 12.88 105.00

4_______ ------------ ------------ ------------ ------------ ---------- ------------ -- --------- ---------- ---------- -------------- ---------- --------------
~::::::: -- ---;97-58 ::::::::::J::::::::::: :::::::::::: :::::::::: :::::::::::: :::::::::::: :::::::::: :::::::::: :::::::::::::: -----;ii:oo --------247:58

/ _______ ------------------------------------ ----------------------

65.15------------ ---------- ---------- -------------- 150.00

215.15

8_______ ------------ ------------ ------------ ------------ ---------- ------------ ------------ ---------- ---------- -------------- ---------- --------------

9_______ ------------------------ ------------ ------------ ---------- ------------ ------------ ---------- ---------- -------------- ---------- --------------

10_______

52.42 ------------ ------------ ------------ ---------- ------------ ------------ ---------- ---------- --------------

20.00

72.!2

II_______ 12_______

f>17.68 73.50

_$_______1_._0_0_1_________8_._5_0_-_-_-_-_-_-_-_-_-_-_-

- __
T_________

491.61 $ 24.79 ----------

1.23 --------------

90.00

19.75 ____________ ---------- ---------- -------------- ----------

1,234.81 93.25

TOTALS ________ -$-~-$---1.~~~~===:===~ 24 79~~~~~~~~~

Schedule No. 10-E--Confd. STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1935 TO JUNE 30, 1936. --

Personal Services

Equipment Expenses

Communication Services

Furnishing Heat, Light, Power and
Water

Rents

Traveling Expenses

Supplies and
Materials

I Insurance I

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Misr.ellaneous Expenses

Total Expenditures

RECONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS

1 ~ District No. ~::::::_ $ !:~:~ ~~ .~~~ ~~ ::::

1!:~:~ ~~ 710.50 _____ 105.00 $

::::::: - s

-~-591::__

:::---1-: :::::::1

:~::~~ ~~

Q')

3...... 10,288.85 6,228.43 ---

2.00

132.00 32,672 04-

---- -- ----------

49,323.32

L ____

189.49

42.90 ____________ ------------ ____

5.80 ---------- __________ ______________ _

238.19

5_______
6_______
7_______ s_______

598.81
3,473.30
10,592.40 391.00

395.65 ------

1,919.79------------

5,924.77 $

7.00

146.14 ____________ ____

1 ll____ 5.24-

89 70 54.50

1,661.12

---- ---------- --------------

16,946.85- -----------------------------------------

39,128.67---------- --------------------------------2,235 87 __________ __________ ____________

2,655.58
22,430.75
55,712.58 2,773.01

g_______

452.76

552.30 ------------ ------------ --

180.35 ---------- ---------- -------------- ----------

1,185.41

10_______ 2,037.41 1,628.57------------

1 II_

10.30 3,275.98----------------------------------

6,953.37

11_______ 7,799.65 5,099.98

12.48----------

154 50 31,669 07----------

3 24 - ------ --------------

12________7,131.~~-~775 88 ___6.33 ~---------~0~--~~- 14,903 33 ~-==~~_::_-~~----~~~~----------

44,739.02 24,038 99

1 TOTALS..______ ~3~~~~-~241 58 ~~~~~===9 ~~:=~~c~~~~l61~~~~:~j~=5~8: :-------------~~~~~~~

STATE HIGHWAY BOARD OF GEORGIA

Schedule Ko. \0-E-Con\'d.

ANALYSIS OF RECONSTRUCTION EXPENDITURES BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1935 TO JUNE 30, 1936.

~~---~--

Personal Services

Equipment Expenses

Communication
Services

Furnishing Heat, Light, Power and
Water

Rents

Traveling Expenses

Supplies and
Materials

I Insurance I

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total Expenditures

RECONSTRUCTION SUPERVISION BY DIVISION UNITS

RECONSTRUCTION DIRECT BY DIVISION UNITS

Division No.1 _______ $ 29' 384.82

2 ...

11,866~28

3 _____

12,034.97

-----

$ 13' 565.28 $
5,712.33 ---
6, 963.97

18.81 7.00

4.22 5.24 --

----~~

~~----

TOTALS..... -- $ 53,286.07 $ 26,241.58

25.81 $

g 46. $

-~~--~
~---~-----~- - - - - - -

871 27

124' 154 27 58,215 39 60,035 82

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30. 1936

Schedule No. 11

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF

-~-----~----'-~ --------------~-~

Land,

. : :~:r .;:....r. ~-. . . -T ...... ...-:-:-:~:-: -1-;~-:3-1:~-.~ EXPENDITURE

General Admtnistra-
tJOn

PERSONAL SERVICES G. 0. Administration Administrative________ _

Research and
Analysis

Collection I of .
Revenue
1

Quarry

!I
Construction
I

Surveys

Maintenance and Recon-
struction

Shop

Buildings and
Equipment

Other Functions

Total Expenditures

:-1:-:-::_:_:-::-:-::-:1-:-::-:-::_:_:-::_:_:-: -.

Others _______________ _

Field Office Administration

Administrative~-- ____ _ Others ____________ _

9,900 00 ---------- ---------- ---------- -------------- ------------ ----

5,146.45----------------------------------

-------------------

Research and Analysis

Administrative______ _ Others ___________ _

-- $ 3,000.00 --- ---- --------

---- 15,094.59 --

---------- --

G. 0. Shop

:: :_:: : :::::: :.::_:::: :::::::-- Administrative________ _ ----------------- ---- -1---

Others ______________ _ ---------- -------- __

___

-____

---- $ 5,080 65 ------------ ------------6,879.14 -------- --------------

::: : ::-: _:::-:::_-[::::::: ~---:~~:;~~;~: _:_:_::::::. :- Direct Shop_----------
Supervision Direct Supervision_____ _ ---- __

: : __ __ __

50,879.99 ------------ -------------20,145.44

Others _______________ _

13,025.03

Direct Costs

f:3urvey Parties ________ _

--- -------------- s 79,417.68 ---

Maintenance Patrolmen_

151,126.27--------------------------------------

Construction and Recon-

struction Foreman ___ _

Equipment Operators __ _

Shop Employees, Field __ Sign Employees _______ _

Other Skilled Labor..__ _ Common Labor ______ _

Quarry Direct Quarry _________ _

Enforce. of Revenue Laws_ Professional Fees _____ _

9,900.00 5,146.45
3,000.00 15,094.59
5,080.M 6,879.14 50' 879.99
317,805.47 29,540.19
79,417.68 151,126.27

TOTAJ,S _______ ----

___ ,'--

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION

JULY 1, 1935 TO JUNE 30, 1936

-- - __-_ c=-====-====--==-=====~======;=======;===;====c;====

I

ADMINISTRATION

I CONSTRUCTION

MAINTENANCE

\

OBJECT OF EXPENDITURE

I ~~ner~~-;;esearch ~-Collection ~~----;---- --'-----I-M-a-ln-t-en_a_n_c_o+----,, Land Build

. Administra- and

of

I Quarry Construction

Surveys

and

Shop

ing~ and

i tion I Analysis Revenue

Reconstruction

Equipment

Other Functions

Total Expenditures

---- ------1--~----~--
EQUIPMENT EXPENSES I

-I--I-
I

Automobile Maintenance ,
Tues and Tubes________ 1-- __ -----~~

j
2 oo _____ ... ______ ... s

302 71 s 300 171$

536 10 ------------ ___________ -------------- $ 1,140.98

Accesso.ries, Parts and 1

Repairs _____________ 1



I

Ro::~~:~~:~:~::~-.~~::: 1------------

1,
5 00,______ -1----------1
4.50------- ------------1

1,877.62 1,395.121

129.75

15767

93 30 S

2.45------------ --------------~

14.30 --------------------------------------1

3,373.49 306.22

----------1 Gas and OiL__________ [$ 146 951 244.38 _______ .

88,072.65

25 37 207,219.13

64.45------------ ------------- 295,772.93

Tires and Tubes. ------1. Accesso:ic..q, Parts and :I
Repairs _____________ i
~:~~~~::~:~~~~~~~:!~~ ~ Miscellaneous Charges.. '1

25 52[

61.70~----------~----------~

I
133 51 I

844 0\----- ___________

::~~------1-~~~-:_::._::: ____

1

__ __ ________ ----------~'1

I, 01:

:.::.::_::

11,177.24 _____ ------- 1

101 152,34 398.09

27.74 4.05

1,1:: ::

338.701

9,780.17

103.50--------------------------

201,506 38

445 00------------ -------------

2,207.91 .. --------- ---------- --------------

--~~-7:1::::.::::::: 184 :: -----

::::::::______

21,148.19 304,109 02
2,610.05
::::: ::

l Repairs to Machinery
Equipment_. __________ [------------'-

_ ----------$

i 12 90\

I
7.94 _____

-------~

5.00 2,165.62--------------------------

2,191.46

R~:lr~~:;~i~;k~~::_~,~~ I 1,828 911

1-------- -__________ I

1
197.58----

820.25

10881 ------------ --------------

2,955.55

Tr:::~~~atl~~-~f--~:"1::1 ____ ----------\---------~------

1,510.36

5 141

998.77

95213--------------------------

3,466.40

TOTALS ______ ---~~ 3,150-; 52;;62 ~~~~=---~~-_;~o s___:o_5._0~~ ~~ ;-,253~~:~-=42~~6!_j~--~.878 771===l::=.::===l~~~~

-------- -~---- ______ c_. _::=_.:=_":~---- ---------=-=----=----=-=.::-_-::__-::-::_--:::-_--=-__:=__::_::_-::__:=-==-.=---==:_:::-- - - - - - - - - -----_-

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION

Schedule No. 11--Cont'd.

JULY 1, 1935 TO JUNE 30, 1936.
= : = = = = = = = = = = - ' - "___ - - - - - - - - - ---------~--

ADMINISTRATION

I--CONSTRUCTION

MAINTENANCE

OBJECT OF

Gener~~-Res-:.~;;-~ Collectio;;-1-- - - - - - - - - - - -

Maintenance

EXPENDITURE

Administra-

and [ of

Quarry

Construction

Surveys

and

Shop

--=1=---=~---=,~------- tion

Analysis Revenue

EQUIPMENT PURCHASES

Reconstruction

Trucb;_ ___ _

_ ::::-:::-y-:-:-::::___::::::::::-_r -------- Tractors_______________
Road Machinery,Misc. __

Offire Equipment __ _

Engineering Equipment_

__ T ______ _

----------

La boratory Equi prncnL_

Land, Buildings and Equipment

Other Functions

Total Expenditures

2, 118.97 -------------2,575.00 -------------1,340.37-------------1,194.14 -------------3,560.80-----
21)1.97 --------------

2' 118.97 2,575.00 I ,340.37 I, 194 14 3,560.80
261.97

TOTALS __ _

$ ll,051.25 -------------- $ 11,051.25

COMMUNICATION

SERVICES

Telephone and Telegraph $ 8,124.09 $ 11.43 $ 62.73---------- $ 1,273 OS $ 18.97 $ 5,60101 $ 847.19--------------------------

15,938.50

1-'-'.""-;-; _.::-"'_"'-:- Postage_ TOTAL~-----

8,317.941__

230 32 __________

~~":"'

~~~:::::

.

_.--;;-., ,

1,728.20

102.98

2,007.60

1.50--------------------------

13,288.54

_;:,~ ;,~_-s--8~-s--~f~-------~--~~~------:._--~---------~ --;-~-o.-22-7~

1

STATE HIGHWAY BOARD OF GEORGIA

n o . ~neau\e

ll~onta.

ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION

JULY 1, 1935 TO JUNE 30, 1936.
- - - --------==========,~===============================-~~==~~====-~======

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE

General Administra-
tion

Research and
Analysis

Collection of
Revenue

Quarry

Construction

Surveys

Maintenance and
Reconstruction

Shop

Land, Build ings and
Equipment

Other Functions

Total Expenditures

HEAT, LIGHT, POWER,

WATER AND CLEANING

SERVICES

Furnishing of Heat ____ _

826.31

78 99 _____

I

3.87 __

Furniohing of Lights ___ _

1,413 52 713.92--- --:: :::

1,686.08--

~-; ~ Furnishing of Power___ _
Furnishing of Cleaning __ Furnishing of '\Vater ___ _
TOTALS ___________ _

35.45

25 72

:: I "'}

~~- ~;: ~ ~=-- 1.50------------I

RENTS Rents, Road Machinery_ Rents, Buildmgs and

2,093.57 $ 49 00

422 64 87.79 12.00 580.90

196.83 --------2!1a.l2 -------1,110.04-
198.20 ------------ --------------

1,103.33 $ 1,804.19-------------------------- $

I, 106.00 4,535 38 1,260.50
24.00 3,011.99
9,937.87

I ,666.17 4,433.80

52 00 --

I ,665.17
7,335.77 2' 928.00

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

Schedule No. 11-Cont'd.

OBJECT OF

General Research Collection

Maintenance

Land, Build-

EXPENDITURE

Administra- and

of

Quarry Construction Surveys

and

Shop

ings and

Other

Total

tion

Analysis Revenue

Reconstruction

Equipment Functions Expenditures

- - - - - - - - - ~--~~~~~-

-------~-1---~-1---~--------~-~-~---1------

TRAVELING EXPENSES

Subsistence ____________ $ 4,012.70 521.00 $3,246.75----- -- $ I ,526. 91 ------------

6,277.26

569.05 ------------ --------------

16,153.67

Transportation

Gas n,nd OiL ________ _ ------------ 210.72

49.50 ------

3.88199 3,112.81

879 64

1.13 ------------ --------------

8,135.79

Mileage Allowance ___ _ 15,055.10 2,107.44 16,938.20----------

60,410.50 7,711.55

13,490.56 1,947.82 ------------ -------------- 117,661.17

Other Tran~portation _

209 50---------- ---------- ----------

810 27

39.49

2_ 70

91.80 ------------ --------------

1,153.76

1 - - - - 1 - - - - - - - - - - - - -------~~-~~-~~~~~-f---~-1--~~-1----+~-~-

TOTALS __________ S 19,277.30 $2,839.16$20,234.45----------

s 66,629.67 10,863.85

20,650.16 2,609.80 ------------ -------------- 143,104.39

,___.

-------------,----1------1--------------1-----1-----1------1------

;::3 SUPPLIES AND

MATERIALS Office Supplies _________ S 10,748.05 $ 365.29 $ 36.00----------

675.51 ------------

s 1,998.00

143.55 ------------ --------------

13,996.40

Drafting and Engineering Supplies _________ _
Photographic Supplies __

3,874.69------------------------------

13,742.88 $ 2,980.26

100.68------------ ------------ --------------

58.86 ---------- ---------- ---------- -------------- ------------ -------------- ------------ ------------ --------------

20,698.51 58.86

Cleaning and Toilet Supplies ____________ _
Laboratory Supplies and Materials ___________ _
Forage and Supplies for

2,207 77

28.57 ---------- ----------

3,025.47 ------------

23.65

15.00 ------------ --------------

1,636.17 ---------- ---------- -------------- ------------ -------------- ------------ ------------ --------------

5,300.46 1,636.17

Animals ______ ---- __ _

Food ~upplies __________ ------------ ---------- ---------- ----------

I Wearing AppareL ______ ------------ ---------- ---------- ----------

Medical Supplies _______

10 58------------------------------

~;;~9~~~~~~:~~s:c~::: ::::::~~;:;;~:::::::::: :::::::::: ::::::::::

43,358.69 ------------ -------------- ------------ ------------ --------------
'!~~/ !!! .oo:;J; i~~p;JLHJJH.j

43,358.69 104,188.96
21' 820.45 3,569.06 5,487. 7~ 8,777.61 g,oo7.11

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936.

Scbodule Mo. \1-cont'lll.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF

General Research Collection

Maintenance

Land, Build-

EXPENDITURE

Administra- and

of

Quarry Construction Surveys

and

Shop

ings and

Other

Total

tion

Analysis Revenue

Reconstruction

Equipment Functions Expenditure

~.082.37 j__ ----- ------------ -------------- ~.592.~2 ---- --~- --------- ------- --- -------------------------

SUPPLIES AND

MATERIALS-Continued Explosives ____________ _ ------------ ---------- ---------- ----------

------------

510

Building Supplies and

Materials ___________ _ Signs _________________ _

7,381.69 ------------

137.81 6.054 53-

7,519.~0
6,054.53

Material~. Roads and

Bridges ________ _

287,111.57---

222,489 82 ---- ------- ----

509,601.39

Materials, Shop _______ _

-------------- $129,382.95 ------

129,382.95

Gen{'ral Supplies, Roads

and Bridges _____ _

12,539 09 ------------

4,848. 93 ------------ ------------ --------------

17,388.02

TOTALS

$ 17,873.20 $2,030.03 $ 36 00---------- $ 516,413.01 s 2,981.76 s 244,055.83 $130,019 15-------------- ----------- $ 913,408.98

INSURANCE

Fire Insurance, Buildings

and Fixtures -------Liability, Fire, etc.,

------- ---------- ---------- ---------- -------------- -----

58401 $ 87.92 ------------ --------------

146.32

EquipmenL ---------

782 17 $ 36 38- ---- -- --------- s 3,187 05---

13,958.91)1

303.03------------ --------------

-----------+------------- Bond Premiums_

1,590 001 27 001 s 48 00 s 6 001

372 141____

819 00

42.00

;I _ _ _ _ -= -; TOTALS__

--2,;;;-~-~~:~ _ 48 6 ool=--3~559 ~=---- -----~-~ __'~;;" ~~~~-9~~~-~-~= --t~

18,267.59
2,904.14
__:~318 ~~

STATE HIGHWAY OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936.

Schedule No. 11-Cont'd.

OBJECT OF EXPENDITURE
PRINTING, BINDING,

ADMINISTRATION -----I---CO_N_STRU~~~N- ___ _ MAINTEN~~~-__1

-~eneral ~earch Collection I

Maintenance

I Land, Build-

Administra- and

of

Quarry Construction Surveys

and

Shop

ings and

tion

Analysis Revenue

Reconstruction

Equipment

- - - - -------- - - - - - ------ - - - - - - -------- --- - - - - - - -

----- -

Other Functions

Total Expenditures

PUBLICITY, ETC.

Printing, Annual Report_ Printing Maps ________ _
Stenography, Typewrit-

1,853.50 ----------ml.21 __________ _

-------- $ 1,853 50

I

793 21

ing and M ultigraphing,
Job Work.--------Photo Printing and
Developing, Job Work Advertising_

3.00 ---

7:l. 92 ----
17.50 s
7 11 ---

12 \1.\

I
_____ --_J:_!~_:_-:_--:-_--

76.92
92 41 6,007.20

TOTALN_

\18.53 $ 12 9.\ - ------- ------------r

8,823.24

INDEMNITIES Compensation, Medical Service Claims aud Costs ____________ _
Damage to Private Property __________ _
Damage for Per~onal Ncrvice:-; __ -----------

TOTALS_

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY I, 1935 TO JUNE 30 1936.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE

General Administra-
tion

Research and
Analysis

Collection of
Revenue

Quarry

Construction

Surveys

Maintenance and
Reconstruction

Shop

Land, Buildings and Equipment

Other \

Total

Functions Expenditures

- - - - - - - - - -

-~-----

-------- --------------------------

PAYMENTS TO

CONTRACTORS Payments to Contractor:3

----------~---------- ---------- $9,170,408.84-

1,000.00--

-------------------------- $9,171,408 84

--~;~ ----=--J~~~~-~ ==~~~ --~=~;; ~-~~-~~ -~~~~~~- REDEMPTION OF DEBT Refunding Certificates __

--- $2,648,765 80 $2,648,76.1 80

>--' SPECIAL AND MISCEL
Ql LANEOUS EXPENSES
Miscellaneous Camp Expense _________ ----
Blue Prints ___________ _ Tests __
Subscription::; and Dues_ Incidentals __ ---------Transfers
Convict Farm _______ _
Motor \'chicle Tags __ _ Burial Expenses __ _ Right of Way Purchases Rewards _____ _ Court Co::;ts ___________ _

li.OO _

$1,930.!17 ------

1,858.00 100.50 ------

531.50

20.43 ----

2,945.58 ----------------- $ 93,215.91
:JO,:l37 .02
56.48 -----

41i0 24 8 00 -

15.00 ------

2,775.00 57,822.73

2,94.1 .18 g:J ,221 91 32,743.23 1,958.50
616.41
2, 775 00 57,822.73

TOTAL~-------TOTALS _________ _

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENDITURES BY DETAIL OBJECT CLASSIFICATION
JULY 1, 1935 TO JUNE 30, 1936

Schedule No. 11-Cont'd.

OBJECT OF EXPENDITURE

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

-----,--- ------------- --------,----1-----J------

General Research Collection

Maintenance

Land, Build-

Adminlstra- and

of

Quarry Construction Surveys

and

Shop

ings and

tion

Analysis Revenue

Reconstruction

EQuipment

Other Functions

Total Expenditures

LESS: INTER-DEPARTMENTAL BILLINGS Blue Prints G. 0. Salaries_________ _ G. 0. Supplies ________ _ Shop Total Expenditures ____ _ Research and Analysis Total Expcnditllfes ____ _
TOTALS... __________ _

s 82,820.31 ---------- ---------- ---------- ------------- ------------ -------------- ------------ - ---------- --------------
11.038.71 ---------- ---------- ---------- -------------- ------------ ------------ - ------------ ------------ --------------

82,820.31 11,038.71

--- $ 202,500.33 ------------ -------------- 202,500.33

NET EXPENDITUI\ES_

Schedule No. 12
STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND EXPENDITURES
BY TYPES JULY 1, 1935 TO JUNE 30, 1936

Description

I July 1, 1935 Jan. 1, 1936



To

~

To

I Dec. 31, 1935 June 30, 1936

Total For Year

ALLOTMENTS

G-rad-ed - Earth and SoiL --- I$ 244, 815. 21$ 455, 174. 54 I'$ 699, 989. 75

Gravel and Macadam__ ----

907, 038. 18, 1,352, 597. 51 2, 259, 635. 69

gurface Treatment-------- 2, 347, 224. 58, 1,257, 329. 69 1 3, 604, 554. 27

Bituminous Concrete_____ l, 050, 071. 90 109, 071. 68 'I 1, 159, 143. 58

cement Concrete--------- 1, 347, 719. 99 717, 133. 59 2, 064, 853. 58

BriCk--------------------

94,789.40 1, 956. 97Cr.l

92,832.43

structures__ -- ---------

501, 521. 59 764, 555. 02 1, 266, 076. 61

- - - - - - - - - - - - - "-

-----~-

Totals ____________ - ____ ,$ 6, 493, 180. 85 $4,653,905.06 1$11, 147,085. 91

I -

EXPENDITURES



I

Graded Earth and SoiL ___ $ 704, 537. 78$ 396, 996. 65 $ 1, 101, 534. 43

Gravel and Macadam______ 1 1, 559, 192. 19, 702, 650. 84 2, 261, 843. 03

surface Treatment________ 1, 689, 605. 20 1,244, 583. 30 2, 934, 188. 50

Bituminous Concrete_____ 893, 527. 43 277, 899. 47

Cement Concrete_________ 1, 302, 278. 14 915, 443. 47

Brick______________________

1, 310. 44 88, 495. 26

1, 171, 426. 90
2, 217, 721. 61 89, 805. 70

Structures_________________

565, 421. 05 193, 900. 99

759, 322. 04

Totals_________________ $ 6, 715, sn23il$3,819,96~~~$i.0,535,'842.21

177

STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT
JULY 1, 1935 TO JUNE 30, 1936

Sr.hedule No. 13.

DESCRIPTION

I Personal Services
I

Equipment Expenses I

Communi I Furnishing
cation H eat,Light, I Services Power and
I Water

Rents

I I Traveling

Supplies and

I Expenses I Materials

EXPENDITURES

I Printing,
Insurance Binding, Publicity
I Etc.

Payments to Contractors
~--

I Speciql
and Mis-
Icellaneous
Expenses

Total --

~ su~~~~~~~~-~T~------- J _ : I

I

d . mz. 4:31i 3) 1,1189 $ :J!l2

1,

I

.< zgz 31[$32,5'l4 IJ5 n,G2sJ__ ___ -_-_!_-_--__- ,

Federal Ai,i__ ____________ l 28,125 91!

227 88l lli9 40 ______ -j :JG 00 5,010 20[

855 091,

_:;,_

:<iational Recovery _____ --1 119,073 37 1,0119.02 .140 48

:J 871 271 00 19,082 04 4,~70 51'_

_ __

---~

Works Program ___ ------[ 9,577 75[

21i 28

40 07[

TOTALS..____

.1-;;;,2~~~:-;-2~;~

55

1
1

STATE FORCES

I

I

1

!IJ 00 1,877 2111

421i.l5j--- ___ _

-1----1 -- --- $--;,-;7;:;5~~4-~-r$ ~~;-;~~~-~~~-~1 !--

--

-- ---

-~-

Convict Forceo.._

-I 19,667 G) $ 42G 34j

Iii

A<phalt Forces___________
r- ____,--- ___ Divioion Forces ________ __!

4,7!17 .12 ___ --------1

Iii

490 04 __ ___ _

5

I_ _ -

--

J TOTALS ____________ $ 24 %1 79 1 $ 42il 34 $ :18 08: _______

1 $4,028~801 $
1,415.fi7 49 50~

_ -i -

-- -- -

$5,4'14 fi:Ji S

387 54 ____ _
:320:7U.5I1011____________ ~ 1
-
718 osl______ ---1--- ------1-

Total Supervision ___

-1 -~--~~-0~

1 19-~}-~~37-8--8;

~~~0-;;:
~-----1

_

S-=--3

~~~~-li~;-;1l~:~=~~~~
- - - - -1 ---~----

$

~3,4:8~~:,:
I

---------1--:c:-.~~~_):;-~--

I

I

I

.

I

__ ,$14.430 57:

__ 2,098 901

188,404.53
3G,523 38

- -110,5{)4 2.1 155,416.54

--- -~~o_~l___1~934 41

- 1$28 004 59[ $ 393,278 86 _I_--

1

I

1 $1. 4:J3 7:l:

25, !I flO 82

1 _ _

!i90 U 1

i,227.02

1

1

148 .57 1

722.88

_r;;27;;;;j; :l3.91;~~

---~-; ----~-----

s ----- $30,3:17.02 427,189 58

~

) ~ ~=~~-~~=~,,

STATE HIGHWAY BOARD OF GEORGIA

CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT

JULY 1, 1935 TO JUNE 30, 1936

.IF . . : commun1-~ urn1shmgI

I

I I supplies .

. . Prmtmg.

I SpeciaI

- .__]___-- --------- ---- - ---- ------- DESCRIPTION

Personal Services

1
,;:~~~"= -~

Equipment Expenses

cation Heat,Light,, Services Power and
1 Water

Rents . Traveling I and
Expenses Materials
,
~- 1

. Insurance Binding, Publicity
Etc.
-~-----

Payments to and Mis-
Contractors cellaneous
I Expenses
~-

Total

~~~::t~~!o"::::: ___ - _,::---------

I

'

-~

$:::!.:~:~~~ ::~1::::::_ $~::!~:~~~ ~~

Federal Aid____ :-iational Recovery ____ ---::::::::_____

--
-I

I
-

--- i_______ :_--J

T-i

--- I

-:~--

(i49,671.78: 3,321,05l.UG'_

649,671 78 3,321,051 96

W:~::::ra:~ - - - ____:_: ~~-:::::~ ~---~-~~~[>~:: - :_ ~~t~ ~~~~~-::~:~~~~~~------ -~ --- -$9~:~~::: : ----~~ $9,::~~~~~

- - - - - - '---~-- ---'~-- ~ - - - ~:--- - ~ - - - - - - - - - - - - ~-- - - - - -

STATE FORCES

Convict Forces

$110,432 h7 $13b,237 0.11 $1,720 28j $:3,.199 68 $ 875 13 $1,1UU GG $:ll5,hU2 28 $2,283 04 _ _

$5.339 \16 577,349.75

Asphalt Forces_____

68,240 5h 42,288 /(,

UU 02[

4.1 95 5h6 88 1,:l4b 401 152,929 84 1,276 151

--------------'

6.20 266,808.76

Divbion Forces____

:l5,430.80 24,100 151

1.25

2.15 140 00 115 40 34,2\12 531 _______ ____

3.00

94,085.28

TOTALS _____________ $214, 113~ ~~~(i2~~~~~;;;-~~__s:-~~78 _51_-~2 01~~~(i21 ~~~;2,~4-~~~:5.1;-~ ~~~---- ~~~~--~~-~ _5~~~~ }=~~24~~

1

Total Direct____ Total Expenditures __

$214,113 03 $202,625 96 $1.820.55 $:l,647.78 $1,582 Oll $2,631.46 $502,U14 us; $3,559.1[1 _________ $9,170,408 841 $5,34\116:$11,108,652.63

I

-

1 -

- - ---.-

- - - - - -:: _:: .:==-__:_--::--!

_: :::-==~

-- -:__---

$-~8~8_:_~~~!2()(j~Q~4~~ $~,oousl__$~h51 b5[ ~2.199 32;$6"_-~9 t'l ~5~~4!.l o~l;l~S:9"1u~~-~~~ ~:~9~~~~40~-~~$3~~~~~~$11,535,842.21

Schedule

No .

13 -

C ont'd,

STATE HIGHWAY BOARD OF GEORGIA

CONSTRUCTION ALLOTMENTS AND EXPENDITURES BY CLASS OF PROJECT

JULY 1, 1935 TO JUNE 30, 1936.

CONTRACTS State Aid

1

ALLOTMENTS

-------- \-----~-~----------- --

1

New Contracts

Revision

Total

1

---- I

I

'

Contractors __________________________ !

4,099,835.111 $ 73,043 7/Cr.

Fe~~;~;~~i~-~~~~:::::::::::::::::::::::1 ~:~~~:~:! :~i 2~~:~;~ ~~Cr.

4,02G,ii 1j
~:~~~:~~1;:

---:--------- i ~ationa\ Hecoyery _____________________

1,720,372 931 237,235 81Cr.

Works Program________________________

1,203,097 33

G 9.i.\ 63

~---------,---~~

11,,421803,,I1l.3\z7

t2 It

TOTALS. _____ --------------------- $ 10,849,635.61 486,G85.3GCr. S 10,362, 950 2S

sT;;,~,~o:C~,~:_________________________f_t_ -~:-:30 J~5,il4~:-- ---:::

Asphalt Forces _________________________ I

257,206.25! 154,045 81Cr.

Division Forccs.. ---------------------- _ _ ~0120\--~~~=-----~-

103,160 44
78,37012

1
TOTALS ____________________________ \$
Total Ai\otments _________________________ $

1~6954,~7337.9'5 :$!1~9~,3=9767~I_C___~I_-s_=_:~78-4,1~35~16

1

180

Schedule No. 14

STATE HIGHWAY BOARD OF GEORGIA

suM::MARY OF ACTUAL CONSTRUCTION ALLOTMENTS BY COMMISSIONERS DISTRICTS JUNE 30, 1936

~I District

Amount

CONSTRUCTION

Beginning of Department to June 30, 1933

-~-----

])!strict No. 1, 2, 3,

Southern __ ------------------ _]$ 45, 099, 763. 46

CentraL __ _ Northern __

~ ~ ~ ~ ~

~

~ ~

~ ~ ~

~

~ ~ ~ ~ ~ ~

~

I

~~: ~~~: ~~~: ~~

Total __ ___________________ I$ 128, 296, 608. 17

I

CONSTRUCTION Beginning of Department to June 30, 1936

District No. 1, 2,
3,

Southern_____________ __ ______ II$ 55, 008, 084. 16
CentraL ___ __ ____ ______ __ _____ 52, 734, 241. 62 Northern _____________________ '. 54,315,091.79

Total ___________________ ,I$ 162,057,417.57

l
CONSTRUCTION July 1, 1933 to June 30, 1936

District No. 1, 2, 3,

Southern __________________ ---1$
CentraL _______________________ _
Northern_____________ _______ -1
TotaL _____________________ I$

9,908,320.70 12,946,062.37 10,906,426.33
33,760,809.40

181

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS
BY COMMISSIONERS DISTRICTS JUNE 30, 1936

Schedule No. 14 Cont'd.

CONSTRUCTION July 1, 1935 to June 30, 1936

CLASS OF PROJECT

:x;

District

State

"' -N~i South;;~ [$--1,722, 8C8.l1 1$

2, CentraL_ _

3, 221, 511. 67

3, Northern __ -~

1, 243,450.03 I

Federal Aid

National

I

Recovery

l , [$ 302,885. ~~$- 268,270.47 1

321,078.09

905, 636.96 [

642, 162.45

309,229. 69

Works Program

I

Total

Allotments

350, 287~M~'$- -3,644: 25l. 70

181,391.44

4, 629, 618. 16

678,373. 88

2, 873,216.05

Totals_

_I$

- - - --- --1 6, 187, 769. 81-$

2_,266_,_1_,2_6~02-[$-
---1

-

-

1~483,

137.

12

-~~--
-----

---~
--

-210-,

(-)53-

96

_

$ _ 11, 147, 085.
==

91

-----

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 111

SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS BY CONGRESSIONAL DISTRICTS

(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS!

JUNE 30, 1936

District

Distr. of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment Over Mileage Basis Distr.

Allotment Under Mileage Basis Distribution

---------------- -

CONSTRUCTION

Beginning of Department to June 30, 1933

>-"--CD C;.l
District No. L _
2 3 __
4_5 6_
7.8 9 ___ -
10 _____ --------

10,871,306.71

$

10,892,038.56

1$

10,742,890.83

11,146,744.96

11, 046, 651. 48

7, 935,376.54

9,309,850.36

9,964,556.45

2,334,163.38

2, 544, 008. 54

9,998,505.62

8, 786, 047. Hi

10,153,010.86

11,403,607.38

11, 358, 051. 59

9,000,583.50

13,510,537.71

17,887,880.50

9,824,491,57

8,626,887.71

20, 731. 85

403,854.13

~$

654,706.09 209,845.16

I 1-

1, .250, 596. 52

I

4,377,342.79

11_ ___ ----
12 ________ _

16,454,516.59 12, 692, 631. 47

18,925,685.12

2, 471, 168. 53

11, 183, 191. 75
__, ________ ---------

Totals__ - __ $ 128. 296. 608. 17 '$ 128. 296. 608. 17

___ _

~-===~= =~=1==- - ' = = = =

-------

I

1

----- ----
3, 111, 274. 94
-
1,212,458.46 2,357,468.09
-------
1,197,603.86 1,509,439.72

Schedule No. 15--Cont'd STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1936

District

Distr. of Total of Allotments on
Mileage Basis

Funds as Actually Allotted

Excess Allotment Over Mileage Basis Distr.

Allotment Under Mileage Basis Distribution

.....
(JJ
... District No. L __ _
----I 2

I
---- ---$

3

4

5

6. ----------

7_

8 __ _

g ____ _

10 __ _

11.-12_

Totals_

$

CONSTRUCTION Beginning of Department to June 30, 1936

13,666,528.31 13, 782, 781. 64 13,784,382.54 11, 683, 156. 17 3,029,005.50 12,547,295.75 12,699,024.32 14,353,710.51 17, 210, 605. 97 12,403,940.28 20,795,076.77 16, 101, 90!J. 81
162,057,417.57

14,157,152.38 13,137,374.00 10,680,436.95 12,328,875.22 4, 147, 961. 88 12,481,650.55 14,420,972.27 11, 632, 827. 45 20,915,775.47 10, 304, 396. 4:i 22,238,843.66 15, 611, 151. 31
I
i$ 162,057,417.57

490,624.07
-
645, 719,05 1, 118, 956. 38
--
1, 721,947.95
-----------
3, 705,169.50
1,44:3, 76G. 8D

i-
-I
-I
I
----

-----------
645,407.64 3, 103, 945. 59
---------------
------- --
65,645.20

2,720,883.06

-
2, 099, 54:i. 85

-
4fJO, 758.50

-

-- --

STATE HIGHWAY BOARD OF GEORGIA

8chedu\e No. \.fi-Oont.'d.

SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS BY CONGRESSIONAL DISTRICTS

(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1936

_- = = - - - = - ' - - = = - - - - - - - - - c .. ==-=~-=- -----=-~=~~~--~---~-~--~.-=--=--=c==--~---=-~-- .c-.~=- -~----_~-

,-~-~-=-~-==--~~-~-~

~-cc=-.--

District

Distr. of Total of
Allotments on Mileage Basis

Funds as Actually

Excess Allotment

Allotted

I Over Mileage

Basis Distr.

I

Allotment Under Mileage Basis Distribution

CONSTRUCTION

July 1, 1933 to June 30, 1936

00-----
"" District No. L

2, 795, 221. 60

1$

---

-----~---

~-~~~~

-~---

3, 265, 113. 82

$ 1
.

469, 892. 22 I~~~~~~~ ~ ~ ~ ~. ~ ~ ~ ~ ~

2~~-

3, 039, 890. 81

I

1, 99o, 629. o4

1

1$-

1, 049, 261. 77

3~~

2, 737. 731. 06

2. 745, 060. 41

.

7, 329. 35

4~

2,373, 305.81

2,364,318.77

8,987.04

5~~~ ~~~~~

694, 842. 12

1, 603, 953. 34

1.

909, 111. 22

1.

6~~~~~~~-

2, 548, 790. 13

3, 6%, 603. 39

1, 146, 813. 26

~ ~ ~ .. ~ ~ ~ ~ ~

7~~~~~

2,546,013.46

3,017,364.89

471,351.43

I

8

2,995,658.92

2,632,243.95

~. ~~~~-~~~

~~,

363,414.97

9 ~

3,7oo,o68.26

3,027,894.97

~1

672,173.29

10~~~

2, 579, 448. 7l

1, 677, 508. 72

t ~ ~ . ~. ~ ~ ~ ~ . ~. ~ ~ ~ ~ ~ . ~ .. ~.

901,939.99

11_

4, 340, 560. 18

I

3, 313, 158. 54

~ ~ ~ ~~~~~~

~ ~ ~:

1, 027, 401. 64

12~ ~ .

-~-~409, 27~4~- ~--4,~27, 9~9_:~- ~ -[--- 1, 018, 681---=.___1 ~

Totals ~~ 1$

33,760,809.40

$

_I==~ ~~- -~ ~~~ ~=1

_ - - _==--_ 33,760,809.40

~~~~~~ ~~~~~ ~~~~ ~~~~~~~~~~~~~:~~~~ ~~~ ~~~~~~~~

-~====~~--==--~~

~=~-

-~--==

Schedule No. 16. STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS1
JUNE 30, 1936

District

Distr. of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment
Over Mileage Basis Distr.

Allotment Under Mileage Basis Distribution

.....

g; District No. ~

-1$

3
!:4 -----------1

~9~_--- -

I

12

CONSTRUCTION JULY 1, 1935 TO JUNE 30, 1936

945,223.49

$

983, 901. 77

903,062.52

812,229.21

238,047.33

848, 678. 87

827,323.67

965, 181. 31

1, 204, 221. 78

857,613.49

1,416, 808.45

1,144,794.02

1,482,988. 61 749,467.85
1, 310,394.94 734,485.34
511, 655. 36 1,068,367.51
728,630.03 403, 301. 83 963,649.69 506,815.98 1, 136, 610. 56 1, 550,718.:21

Totals____

$ 11, 147,085. !Jl
I______ ------

[ . - _ _ _ _ - - - -

11,147,085.91

537, 765. 12 407,332.42
----
273,608.03 219,688.64
405, 9:?4. HJ

234,433.92

----

-

77,743.87

98,693.64 561,879.48 240,572.09 :-350, 797. 51 280,197.89

----------

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 16-Cont.'d.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS

(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1936

District

Distr. of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment Over Mileage Basis Distr.

Allotment Under Mileage Basis Distribution

MAINTENANCE JULY 1, 1935 TO JUNE 30, 1936

>-' --------------------~----------------~-

CfJ

_, District No. L _____________ $

99, 905. 43

$

112, 302. 22

$

12, 396. 79

2--- ----------3______________

103, 782. 02 95,326.33

103, 481. 88 100,698.25

- -----------. - $

5,371.92

--------

300. 14

4_-- ----------5______________

85, 641. 65 25,112.29

80, 212. 58 21,099.94

----- . -- -

5,429.07 4,012. 35

6______________
7-------------8_------------9______________

89,481.59
87, 238. 27 101, 731. 33 126,983.23

92,426.06
82, 069. 26 96, 247. 22 117,671.98

2,944.47
----------------- ---

--
5,169.01
5,484.11 9, 311. 25

10______________ 11______________
12 _____________

90,404.41

149,334.82

120, 783. 47

I

95,341.15 153,939.29
120, 235. 01

___ ----

4,936.74

4,604.47 I __________ _

__ _- -~

548. 46

Totals ______ ~$-1~,~724~~$-1,175~:84~~~~ _ ~ - ---~~-- ---==( _ ~=~ =~-

STATE HIGHWAY BOARD OF GEORGIA

Schedule No.16-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS

(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1936

District

Distr. of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment Over Mileage
Basis Distr.

Allotment Under Mileage Basis
Distribution

......

oo

I

00 District No. 1

-$

2 3 ____ _

4 __

5 6_

7

8 9 __ _ 10 _____ .
1L ________ _

12 _____ _

RECONSTRUCTION JULY 1, 1935 TO JUNE 30, 1936

56,472.59

$

58,232.56

53,633.60

47,987.86

14,096.86

50, 132. 68

48,892.84

56, 926. 55

71,172.95

50,610.46

83,567.29

67,834.51

20, 701. 27
36,718. 67 58,969.51
64,782.89 2,655.58 42,354.04 161,648.20
15,407.00
8,249.99 100,960.72 103,244.63 43,868.25

Totals

- \$-

659, 560. 75 ]$

659, 560. 75

--- ~ -=~---~ ~-=r__ ~---====-~-~
--------------------

5,335.91 16,795.03
112,755.36
50,350.26 19,677.34

35, 771. 32 21,513.89
11, 441. 28 7,778.64
- --
41,519.55 62,922.96
23, 9G6. 26

Schedule No. 16-Cont'd. STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1936
--------- ----

District

Distr. of Total of Allotments on
Mileage Basis

Funds as Actually Allotted

Excess Allotment
Over Mileage Basis Distr.

Allotment Under Mileage Basis Distribution

---------~------------1 - - - - - - - - - - ~- - - - - - - - - - - - --~--- - - - ~ - - -

SURVEYS July 1, 1935 to June 30, 1936

District No. L ___________ _ 2 ______ _ 3 ____________ _
4_----- ------5_-----------6 ____________ _ 7 _____________ _ 8 ____________ _ 9 ____________ _ 10 _____________ _ l l _____________ _ 12 __________ _
Totals ___ !_

-----;-~--~---~~----~---~----

1s, 1s2. 3s I,$

18, 869. 51

17,338.33

15, 568. 45

4,566.15

16,266.20

15,859.12

18,490.04

23, 084. 61

16, 432. 29

27,142.27

I

21, 963. 37

13,578.74
21, 256. 09 15,165.31
16, 229. 29 27,259.26 11,151.21 20,833.24 13,025.88
23, 595. 91 15, 184. 14
11,755.05 24, 728. 60

__________ _

$

2, 386. 58

660. 84 22,693.11

4,974.12

i'

511. 30

----- ----

II _ _ -

-

-------
2, 765. 23

_ 2-13~G2-:-72~1~~= - _ 21~_.7~~7=-=~l---~~~~---~~-----~---

4,603.64
2,173.02 ------ -----
5,114.99 ---------5,464.16 ----------1, 248. 15 15,387.22 --------------
--- ~~~~~~-~~-----

1

I

Schedule No. 16-Cont'd. STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASISJ
JUNE 30, 1936

District
-
f-' '-D
0
District No. 1 2 3 4_ 5 6 7_ 8 9 10 __ 11 12
Totals

Distr. of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment Over Mileage
Basis Distr.

------

----- - - - - - - - - - - - - --- - -

TOTAL ALLOTMENTS

July 1, 1935 to June 30, 1936

----
1, 119, 783. 89 1,164.785.86 1,069,360.78
961,427.17 281,822.63 1,004.559.34 979,313.90 1,142,329.23 1,425,462.57 1,015,060.65 1, 676,852.83 1,355,375. 37

----- ---

$

1, 629,570.84

910,924.49

1,485.228.01 895, 710. 10 562,670.14

1,214,298.82 993,180.73 527, 981. 93

1, 113, 167. 57 718, 301. 99
1,405, 549.53 1, 739,550.07

509,786.95 415,867.23 280,847.51 209,739.48
13,866.83
:-34, 174. 70

1:1, 1%, 1:14. :~2

$

1:3, 196, 134. 22

Allotment Under Mileage Basis
Distribution

I

253, 861. 37

1$

-

65, 717. 07

1-
IH4, 347. 30 312,295.00 296, 75R. 66 271, :103. 30

STATE HIGHWAY BOARD OF GEORGIA

Scb.edu\e No. U.-Oon.t.'d.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS

(ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASISJ

JUNE 30, 1936
- . ____c---.-- ---c_c=--=-=====---------=-=-----==----_-_--_-_...cc=~-- ---

Other Allotments Undistributed

Administration Research ____________ _

Collection of Revenue _

Quarry _________ .. _-----

Shop_____

_________ _

Equipment

. ________ _

Motor Vehicle License Tags ____ _ Convict Farm _______________ _

Refunding Certificates_

.$

228,887.05

76.10

42, 181. 59

1,420.19

128. 67Cr.

11,758.03

57,822.73

2,660,585.12

Total Allotments July 1, 1935 to June 30, 1936--Exhibit "B" ______ _

_$ 16,198,736.36

STATE HIGHWAY BOARD OF GEORGIA ENGINEERING
STATE MILEAGE BY ENGINEERING DIVISIONS AT JUNE 30, 1936

STATE MILEAGE BY CONGRESSIONAL DISTRICTS

AT JUNE 30, 1936 -----=--==--c-:--:c=== - - = - : : - ----------------_,---~--

1

Cong. I No. of -~s~~- ~ounties

Area Sq._Mi1:_~

1 1

Population 1930 Census

:Mileage at 1 6-30-35

I Mileage at
i 6-30-36

1

'I

13

2

13

3

15

4

lO

5

4

6

13

7

13

8

13

9

18

10 I 12

ll

20

12 i 15

Totals_ 1=~59

I

6, 396 I
5, 528
4, 563 3, 777 1, 140
3, 614 4, 366
I 4, 193 '
I 5, 449 4, 657
~ 9. 465 I
j_5, 577__

[58, 725 ,

,

I

260,2911 242, 2761 189, 7191 2"0 708' 422: 2061 221,0501 262, 219 198, 927' 218, 4961 212. 9341 221418~._23990011
2, 908, 506]

773.4271----:::

812. 392! 815.642

743. 1791 750. 519

671. 766

671. 471

196. 448

207. 262

702. 02.5j 702.338

684. 073' 684. 266

799. 576

795. 936

995. 6261 986. 001

110. 0791

7os. 723

1. 173. 655 1. 167. 791

944. 183, 972.868

9, 206. 429: 9, 272.807

STATE MILEAGE BY COMMISSIONERS DISTRICTS

AT JUNE 30, 1936

-----------------

Co~m. I No. of

I

Area

1' Population

, Mileage at :Mileage at

j,

_DIst. I' Counties Sq. Miles 1930 Census 6-30-35

6-30-36

1

I 1
_ _5_6_ _ I 22, 916

2 ' 51

19, 561

846, 415 --3~128. 339 1 3, 189. 762 1
894, 1351', 3, 204. 5291 3, 211.241

3

I

52

16. 248

1. 167. 956 2. 873. 561, 2. 871. 804

Totals_ 159

58, 725

2, 908,5061 9, 206. 429 9, 272.807

1

1

192

Brantley County-llllaintained Roadway. State Route No. 50.

Pulaski County- Pulling Ditches and Shoulder Work, Hawkinsville-Perry Road.

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936

Project I COUNTY I Eng. Cong.

Number

Div. Dist.

- - - - 1- - - - - .. - - --------

Chattooga_

2-B 20 21

Rabun.---CarrolL ____ Heard _______

21-C TrouJl-25 Candler __

42-A Chatham ___

>--'

47

Screven __

"m"

47-B Effingham.

52 Evans_

5:J-C Bibb __

53-D Bibb 58-B Jat~per __

60 Sttphcns_

74-A Sumter ___ 90-A Cook __

---1

- --r 101

Sumter ____ ---

11 :l

111-B rmon_ ------

116 walton __ 119 Ptekens_

-r

121-A Randolph

134

Coweta __
'

'i

138-A Warren

to

140-A Hancock

10

--

!54-A Wayn('_

It

I

'r

---------

------

I I

~roject I

COUNTY

Eng.

~~~~e~l _ _

Div.

154-B Wayne 155-B Hart___

------I

155-B Elbert

155-C HarL

158 Twiggs 164-C Sumter __

:I

167-B Chattahoochee_

...... 178 Murray_
"'__, 186-B Johnson 186-B Laurens_

190-B Murray __

194-C Fayette __ -----

196-C Clay __

i - - - - -

199 Quitman_

206 Tattnall

210-A , Jeff Davis

215-A Bank,_ 215-B Banks _______

215-C Bank~-

228-A Greene __

234 239

Camden __ Sumter __

-- i
----~

242 Polk

256-C Appling_

264

Early __

-I

I

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION

DURING FISCAL YEAR ENDING JUNE 30, 1936

Con g. Comm. Dist. Dist.
11 8 8

~~_I-';~; 1~::

7.~87

_______ _1 _____ ~--

:J. 721

Resurface

I
I Surface
I Treatment

1. (\4;')

I
I Bituminous Cement
Concrete _ -~oncrete

I

12

1174

:J

ti. \J20

12 12
7
I
11

.\UO ! 111.1:34
7 .Oi'i 1.2\Jti

11 3
11 2

Brick

Structures

.022

.o:Jo

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936

Project

COUNTY

Eng.

Number

Div.

270 2/ti-B

~~~~~I~---~~~~~~~~~~ I

276-C 277 280

emon_ ___

I'

Ware __

Clayton ________ _

280 287
,_. 291

~~~,:;:~:~ - ~-:_-.I

WarP__

___

CD 00

299-A PulaRki_

299-E Wilrox

2fHI-F Pulaski__

317-A Lumpkin

:J17-C Lumpkin_

:123 Columbia

:J29 Hall __ _

:l42-A Twiggs __

:J43-B Randolph_

:H:J-C Handolph

:1.12-A Banks ___ _

:J5:J-B Montgomr'ry

;)55-A 'Yaync __

:)I5:l-A (;lynn_

374-B ~{'Wton __

374-C , XPwton_ 387-E II BurkP __

!

Con g. Dist.

Comm. Dis!.

Graded Earth

Top soil and
Sand Clay

Gravel and
Macadam

11

12 11 12 12 12 9
()
10
()
12 3

12

11

G. !\\14

11

I. !04

__i

I

I

Resurface I

I Bituminous
Concrete
1

Cement Concrete

ti.:!it)

W.iJJ

Brick Structures

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936

I -Project

COUNTY

I Eng.

Number :J\!0-B C'ra\vford_

--1 Div.

.1!10-C l"pson_

:J\10-D Cra,,fonl_

:I

40H' Bl'rriln

4o:l-E Tift

4117-B NPwton 4111-F Atkin:'<lll_

I

...... 410-<i :Hkin~on __ ---

ccoo

412-E Tdfair ___ -----

412-F Telfair ____

--1I

418-E Crawfonl __

4111-B H<n HilL

422-C \\"hitficld

I

42.\-C Hab1nL

425-D Hahun ___

4211-D (;ordon_

I

428-A Bryan

428-B Bryan

I

428-D BryaH __
I
428-1: Bryan

428-F Bryan_

I

4:\3-C Harabln

4:34-.-\ ()conCl'_.

I

4:l7-A (}laMCOl'k_

437-C c;la~coek_.

Gong. Dist.

Comm. Dist.

Graded Earth

Top soil and
Sand Clay

Gravel and
Macadam

Resurface

Surface

Bituminous

Treatment Concrete

Cement Concrete

Brick

li

2. UHii

(i

ti. 2:18

II

4. 2/li

8. 271

. .1fi5

II

.1Jii8

II

8.124

12 12

Jil.li08

-----

I

I

\J. 4ti0

I
IO.tlli'

I --

I

--

1. U\Hi 11.242
I ;) ..1.58

I
l --

I

. i:2\!

I

284

I
I"

I

I

I

.1\J\1

I

I

1. llo

I

I I

411i

I I
1. fl n:~

I

----- I

I

I

i .214

I
1.\Hiii
I

111

2 8114

I

Ill

1.4711

I

Structures .1145
.06H .IIIIi .042
I
.1:111
I
. tn4 .IIIIi

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936

I

Project

COUNTY

I Eng. Gong.

I Number

Div.

--~~--~- ~~~ ~-----

Dist.

44:l-F Jones ___ -------- ...

450-R Lincoln_

10

461-A Bacon

.:1 :l

II

461-B Appling ___

II

461-B Jeff Davis_

11

461-C Bacon

II

483-C Madison __

8

{\0 483-E Madison ______

8

0 0

486-A Tattnall___

486-C Tattnall__ _______

486-D Tattnal!___

488-A Floyd ____

491-B Bartow

492-A Dooly

492-C Dooly

2

4\!4-B Berrien ___________

II

495-A Quitman .. --- __ -

3

496--C GwinnPtt ___

496-D GwinnetL ...

496-E Gwinnl'tt ____ 499-D Houston ____

:1

9 12

499-E Macon

:;

500-B Worth __ 500-B Crisp _____
I 501-C Floyd _____

Comm, I Dist.
I
I I

Graded Earth

Top soH and
Sand Clay

I
---
I

Gravel

and

Resurface Surface

Macadam

Treatment
--- I

I - - -

:;.:;s:;

I

,) .--17:)

.).\)21

Bituminous Concrete

-

l. 271

I

i

I. 3\J I

ti.8Ui

ti.:!l\J I
--1.:;<,),)

8. 110 I

Cement Concrete
!

---------
---- I I
.J.)H
I

I I
I I
1,
I :z. I ill
II .IIIII
., 1S-t
-L /15 i.S:!-t

I
:; . s:ti
l.IIJ I

.,,,_
. \!77 :! .8;)7
:!.li:?O :'

Brick

I Structures I i
.Oil
' I
.1142
I
.2:Jo .1153
1,
.1.11

STATE HIGHWAY BOARD Of' GEORGIA

SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION

DURING FISCAL YEAR ENDING JUNE 30, 1936

Top soil

I Gravel

\ ~

Project

COUNTY

Eng. Cong. Comm. Graded

and

and I Resurface

Surface Bituminous

--------------- ----- - _-__--_- - Number

Div. Dist. Dist.

503-B Bulloch ___________

-~~---

Earth

Sand Clay Macadam

1 Treatment Concrete

~---- ~-- ----~ ~.~~~~~ r-~_(j~~~-

505-B Bleekley __________

i .807

Cement Concrete

_s::::_ \
Brick_l
1
-!I

505-C Twiggs.. _______ ._

1l.5(j(j

505-D Twiggs ___________

12

8.45\J

506-D Columbia __

10

.033

507-B Decatur ___

~~. !JOi

508-A MitchelL._~

4.1511

"" 508-B Grady _____
.0..... 510-C Burke______

511-A Wilcox_ __________

12

:3.:12.~
fi. 7H\J 4. 640

511-B Crisp ______

3

:3.252

512-C Schley _________

512-D Macon_

512-E Schley. ________ ._

u.034

514-C Thomas __________

.5 .397

515-B Coffee.... ________

11

5. 782

.087

517-C Meriwether~------

.104

517-C Pike _________

.103

518-C Harris ___________

.029

520-B 520-C 524-A 529-A 529-A 529-C

Taylor ___________ Macon ___________ Coweta __________ Barrow ___________
Jackson _________ Barrow ___________

---

1---

4.856

--- -----

----

----

-------- i

1--

5.291

r .109

.094 3.191

~----------

r~-~ .213
- --r-~

.038 .069
~------------

i

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936

Project

COUNTY

Eng.

Number

Div.

532-B Calhoun __________

534-A DcKalb __________ 534-A Fulton ___________

534-B DeKalb __________ 534-D Fulton ___________ 535-E Fulton ___________

538-B Peach ________

"0 " ""

540-B 545 546

Hart__ ________
Tattnall__ ______ Bibb __________

548 Turner ___________

549 Habersham _______ 552 Taylor_ __________

553 Brooks ___________ 554 Upson ___________

555 Spalding _____ . ____ 2

556 Jenkins __________ _ 2

557 Clayton _________ _

570 Paulding ________ _
582-B I Warren _________ _

586 Harris ___________ _

586-B Meriwether _______ 1 589-C Jonca ___________ _

590-B Baldwin _________ _ 591 C Bryan ___________ _

1

Cong. Comm. Dis!. Dis!.

Graded Earth

Top soil and
Sand Clay

Gravel and
Macadam

Resurface

Surface Bituminous Treatment Concrete

Cement Concrete

Brick

Structures

2

.275

5

----

3.046

:::::::::::::::::::::::::::::::::::II

.430 5.108

.063

.016

.338

.039

12

8

.030

3

.063

9

6.368

6.666

11

.109

6

.021

6

:::::::::::: ------:3o6-- :::::::::::: :::::::::::: :::::::::::: :::::::::-- _:::::::~- _:-:::::::: I

.037 .030

10 4
6
10

r. } ::::::_-/:::::}_::_- -j-: - -_-_- ::::::::::::::::::::::::1
1:::::::::::: -----------

~:m4.m ------ --- --- ------- ----- -- I

:~o:__ - - -- -- ----- I .054
1-: -:: ::::}: ____

1 ,:::.::::.r 1 ;

ij,

SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION DURING FISCAL YEAR ENDING JUNE 30, 1936

Project

COUNTY

Eng.

Number

Div.

593-A 593-B 594 617

Burke ____________ Burke ____________ Burke ____________ Troup ____________

629-C Richmond ___ ----651-C Pike _____________

674-B Jones_-----------

""0
CAl

738-A Carroll__ _________ 755-A Banks ___________

755-B Jackson ____ - _____

771 Greene ___________

785-B Whitfield _________

786 Bryan ____________

787-C Talbot ___________

796 Burke ____________

806-D Whitfield _________

817-A Troup ____________

817-B Meriwether _______

832-C Appling __________

832-C Jeff Davis ________

835 Heard ____________

838-A 847-C 852 853-A

Gordon ___ ------Dooly ____________
Wilkinson ________ Coweta ___________

Cong. Comm. Dist. Dist.

Graded Earth

Top soil and
Sand Clay

Gravel and
Macadam

Resurface Surface

Bituminous

Treatment Concrete

Cement Concrete

Brick

Structures

.005

4. 236

2

.477

.477

2

.055

10

1. 936

6

1.827

1. 788

.416

. 915

.630

. 778

4.501

1.070

1.250

.190

1.949

.022

17.595

. 999

4

5.986

4

1.698

11

------------ ------------

1.265 ------------ ------------1----------- ----------- ------------

.005

11 4 7

:::::::::::: :::::::::::: _:-_:~::~~:: :::::::::::: :::::::::::1:::::::: -_: ::~:~;~-- -__::::::::: .048

10

: : : : : : : : : : : : --.J~~~-- : : : : : : ::-- -~~~-- :_::::::::::1:::_:::::::: ::::::::::::

.037 .019

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION

DURING FISCAL YEAR ENDING JUNE 30, 1936

==~============~=====-=-=-==================-~~=-==-~-~-====-====-~-==-=-=-==~--~~~-------=

Project

COUNTY

Eng. Cong. Comm. Graded

Top soil and

I Gravel

I

I

I

and

1. Resurface I Surface

Bituminous I Cement

Brick

I I Structures

Number

Div. Dist. Dist.

Earth

Sand Clay Macadam I

Treatment 1 Concrete Concrete

854-A 861 861-A 905-A 905-E 905-F

Henry............ Jefferson ......... Jefferson ......... Atkinson . . . . . . . . . Echols . . . . . . . . . . . Clinch ...........

10 10 II II II

,~, +1..\.......................................~."... 1----1........... --~1--- ---- ----~---- --~ ~~~=---- =:~~-~~ ~~~=~~~--

:::: I 1 ;:;:
.077 ............ ............ ............

i -

926 Evans ____________

N 9H-C Dodge..........

0
""

944-F Bibb............. 961-B Lincoln .........

I 12

2 :::::::::::: :::::::::::: ~:~!!

2 10

!::~~

1::::::::::. ::::::::::: 1::::::::::::

978-A Jasper------- _____

6

4.469

978-B Jasper........... 2

2

982 Dawson __________ 3

3

6.577

4.193

988-C Floyd............ 3

1.3II

990-A Floyd............ 998-C Fannin ___________

1003-A TattnalL ........

1003-B Candler..........

1009-B Stewart. .........

1013 Effingham .......

1016-C Colquitt.. ........ 1022-A ,Jenkins __________

1028-B Spalding .........

1031 Tift. ............. 1033-A Cherokee _________

-------- -----

Project I' Number I

COUNTY

Eng. Div.

IO:l4-A ~umtl'f __

IO:l4-H Crisp_.

j

JO:Jfi Crawford_

w:Ju-A Houston

lo:l~-ll Maeon

I

10411-.\ Jasper

1040-B Putnam_

I

1041-C Calhoun_
""0 1042-.\ Calhoun_
"' 104:1-A Towns_

I

10.12-B Douglas ___ 10.12-C Paulding_

I
:I

10.18-B Grady_

101i2-A Walker_._

101i!I-B Brantley_

I

1071-A Turr]{'r __

I

1071-H Irwin_

1072-A Irwin

I

1072-B BerriPn _

11176-A Puhu;ki_

1082-A Coffpr

I

1082-(' Atkinfion

1086 Clayton

10!111-B Decatur

I

Hl\14-A Dougherty_

Con g. Dist.
12 :l
11 11 11 11 12 11 11

STATE HIGHWAY BOARD Of' GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30. 1936
-------

Comm. Dist.

Graded Earth

Top soil and
Sand Clay I

Gravel and
Macadam

Resurface

Surface Bituminous Treatment Concrete

Cement Concrete

J
.:Jij[) I. \120

--- -10.112 I

l .027

I

.672

!
1.188
i .281
. GliO

.S:l:l

:l.408

.1 .:J:l9

I

4. lGG

071

. g:J7

I

I

I 1.!57:1
I
li.:l!lli

--

I. !188

I

1 .542

I

2 .os:J 2. 8118
I
1..1.\4 .1 .67:l 2. 2\l2 I

I

.1.4:n L\4!1 I

..)2\l

I

T

--1

I

I

--

I

I

I

i I

I

I

-- ~~-

---

I

I
--
I
i
i
:

Brick

Structures

.08:l

.004

.II:J8

I

.1104

I
---

. 11115

!
.080

i .1:)(\

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936

Project Number

COUNTY

10\l/-.\ Taylor __

1091-B Taylor._

lllli Monnw_

1117 Columbia __

1118 Hart

lli8-B

I I

Hart..

1121

EmaJJtH'l __

"" 1122-B Julm::,on __

0 Cl

1U~-A

Ogldhoqw_

1124-B EllwrL_

1121i-A I.tlWildP~-

1126-H LaiJicr_

1.102-A C'larkc_

I.IO.o-A Crawford_ ...

1510-A MontgrmHTY

1510-H TrcntlrIJ __

I filii-.\ l'pt'Oil

1511

('alhollll __

l.i~l-.\ B<"a Hill

15:.!~-.\ I TPlfair_ 1.1~2-B CofTrr ____

l:l~-1-B i \Yorth

152~-.\ I Dougll('rty __ lS:lH-H I ('alhoun

t5:W-.\ 1\rn\1.

Eng. Con g. Div. -1-Dist.

Comm. Graded

I

Dist.

Earth

10
s

Top soil and
Sand Clay
.:1U7

Gravel and
Macadam

Resurface
I

.\l02 I .701 5.541
.:l\17 .:lti\1

12

2.\16.5

12

1.287

I

2. ()40

.274

1.274

11

. n:J2

:l.408

II

.206

2 .47.5

1.221

li

1.401

1:?

u .a!m

12

2. t) t:~

5. 142

u

I.IJ.tS

t.!nt 4 .ti/;)

II

11.11~8

""""I

1.54!1

I

11.270

):

.5.12:1

'
I '

:Li'40

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MILEAGE PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936

Project 1 Number[

COUNTY

II Eng. D1v.

i 1

I

I I 1 Cong. Comm.l

Dist. Dist.

Graded Earth

Top soil
and Sand Clay

Gravel
and Macadam

Resurface

Surface

Treatment

Bituminous Cement Concrete Concrete

Brick

Structures

---[ -:-:-: -:-:-:=-: -:==-: === =-:-:= 1 ~;~ 1~effer~o;;-:-:-:=~- ;--~~-~~-~~-

-:~.

~~~-:-:-:~

------.;~- -~~-:= -:==~

1539-B I Douglas __________ I 3

.

[------------ _

.984 ------------ ___________ ------------ ------------------------------------

1542-A P1ercc ____________ [
:~!LA 1 ~;~~~~,:;,~~~~~~~::::[ II

I II I
I I~ I

[

.196 -----------

3.288 ------------ _____

___________ ------------------------ ------------

1--- 6.239 ---------- ----;:491)- :::::::::::: ::::::::: ::::::::: :::::::::::: :::::::::::: ::::::::::::

:m:: s::~~i~~;,: ::::j :

1:::::~:~~~:: :_ 3.522 ::::~:os~: :::::::::::: ___:::::::: :::::::::::: :::::::::::: ::::::::::::

~~:F ;~ >.;: '"' : -~ !l1t::m:~ I~~:~~,~-'_-_:-------

i ::
I I

i1::::"::::::::I:::::::::::: Tm ----------- ------------ ------------------------------------ .159

""' : .;~ ~ E . . :Er '":::~ eel1~~-1- , -~~~--111=~~~~~~~~=~~;~= - 3;;j::~=~=~~~ ~~~}~ ~~~~~~I----~~:~~s-- ----;:;~~-- ~~-~~~~ -2--

I=

--------------

STATE HIGHWAY BOARD OF GEORGIA MILEAGE PLACED UNDER CONSTRUCTION BY ENGINEERING DIVISIONS AND
COMMISSIONERS DISTRICTS DURING FISCAL YEAR ENDING JUNE 30, 1936

Number of
Projects
_______ :_

Type of Construction

Division and
District One
!Miles)

I I
Division and Division and

District

District

Two

Three

(Miles) I rMilesl

Total !Miles)

3H

Graded Earth __ _

4

Top Soil and Sand Clay

113

Gravel and Macadam__

84

Resurface_

10

Surface Treatment_

13

Bituminous Concrete_

2H

Cement Concrete_

2

Brick_

76

Structures__ _

368

TOTALS_

68.903

12.184

14.948

6.877

129.171

163.900

67.072

159.629

116.451

74.895

27.305

26.758

3.402

77.724

1. 974

40.158

46.936

1.173

1.798

1.444

.505

- - - - - ~---~---

~---

------

_ , 392.180

- 419.911

- - = =-=-=---~== _.::=__::_

1

1

96.035

I

6.877

360.143

350.975

54.061

81.126

89.068

1.17:-l

3. 747

1043.205

STATE HIGHWAY BOARD OF GEORGIA

MILEAGE PLACED UNDER CONSTRUCTION BY CONGRESSIONAL DISTRICTS

DURING FISCAL YEAR ENDING JUNE 30, 1936

===;=============;=====7'~=~---c=~--=~-~~=-----~--~c -~_~----~~~---~~~~~

Number

TYPE Of CONSTRUCTION

I Cong. Dis!.

Cong. Dist.

Cong. Dist.

Cong.
I Dist.

II Cong. I Dist.

II Cong.
' Dist.

II Cong. I Dist.

II Cong.
Dist.

1 ,

I \ \ \I Cong. \ Cong Cong

Dis!.

,

Dist.

1 ,

Dist:

Cong Dis!:

360 1 1 8 -~r_o_oief_ct_s ~-----~------~--~~

~~~f>lOjn~e~~~M.Tiw1eos)

~~Ti'h"_rseJe_ll

~MF,o.ui:~r")_

I

Five (Miles)

I Six
1
(Miles)

I Seven , !Miles)

1 Eight 1 Nine (Miles) 1 (Miles)

Ten (M1Ies)

I
1

(EMleIv~e~n~~I~T~w~~el)v-e\~~iTloetasl)~

38

Graded Eartk~~~~~~~~~~~

~~~ "

I 5l.l67 [10.796 UG.0.35

Top Soil and Sand Clay~~ 113 Gravel and Macadam_

~5: 31.6111 [ 821

:i~:38; [.~o.251l~~:l6~:~~~

84

10

.N.......

13 28

2

76

368

Resurface __ Surface Treatment_ ___ Bituminous Concrete Cement Concrete ____ Brick_~~~~~~~.---- -------------Structures __________
TOTALS ____

49.167 .\170 5.600
27.753

.fl92

.O:ll

.2631 .395 .0.\5

-~ - - - - - - - - - - - -~- . - - - -

I
140.144191.344 ,114.3\13 51.710'1 11.5\17

l =~c=~'~= ~ci~~c.=

I

I

I

36.847. 42.760 l':l50.\175 21.7o:l ~~~~~~~~~ 54.061
~~~ ~~42.756 81.12G
.787. 10.102189.068 . 728 1.173
I 1.0\11 .191, 3.747
til8liHI~~ :~~~5:~;-!~~-2~

Project No. 624-A- Coweta County- Concrete Bridge and Concrete Paved Approaches Eliminating Grade Crossing.

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF BRIDGES PLACED UNDER CONSTRUCTION

DURING FISCAL YEAR ENDING JUNE 30, 1936

- - - - - - - - -=-------==--- _ - - - - ------=-------=-::--=~--_:---_-_===c=======:=========-=--=-=-=-=-=-=;=c.==--==c--=-----

Timber,

Concrete Concrete

I

1-Beams and

Timber

Bridge

Piers and Widened

Totals

Project

County

Eng.

Number ----- - -- -

Div.

60 138-A 140-A 154-B 158 194-C 199
.'.."...,.'.. 210
215-B 234 280 299-A 323

Rabun ....... Stephens _____________

'

\

7 \

a

r

r

e

n

______________

Hancock _____________

'\Vayne _ ----------

Twiggs __ --- --

I

Fayette ______________

Quitman _____________

Jeff Da,is-Tclfair _____

Banks --------------Camden _____________

Fayette-Clayton_

2&3

Pulaski ____

Columbia_

343-C Randolph.

355-A Wayne-Glynn

390-B Crawford

407-B Newton_

412-F 428-A 428-B

Telfair Bryan ___ Bryan __

428-F Bryan_

437-C' nla~cock

i

4o1-ll 486-C 486-D 488-A

Jeff Davi~ Tattnall .Tattnall - Floyd

I
~ I

I N u m b e r 1

Concrete Concrete Floors (Lin. Ft.)

Cong. Comm.

of Concrete and 1-Beams

(Lin. Ft.)

Culverts (Lin. Ft.)

Structural Steel

Concrete (Lin. Ft.)
(Lin. Ft.) I

~~!.-_Dis!._ _B_ri_dg.,._ _(L_in_._Ft_.J _(_L_in_._F_t._)- I - - - - - - - - - - - I

1

1

__ -~~F_t_.J_______ - - - - - -

3

I

200.0

200.0

48.0

46.0

94.0

10

158.0

200.0

10

::::::::::::1::::::::::

79 0

358.0 79.0

11

120.0

120 0

12

720

72.0

6

240.0

240.0

160 0

160.0

11&12

I, 660 0

I ,660.0

266.0 -

266.0

11

85 0

85.0

2&3

400.0

400.0

12

289.0

289.0

10

120.0

120.0

150 0

150.0

11

108.0

108 0

6

2

238.0

238.0

3 12
I
10

::"~})r~/)1 .JJ

11

__-_:~..:..:._:_:c =~-----~

STAT HIGHWAY IIOARD 01' 00ROIA SUMMARY OF BRIDGES PLACED UNDER CONSTRUCTION
DURING FISCAL YEAR ENDING JUNE 30, 1936

I
I
Project [

County

Number
----1 - ~- -----
494-B I Bemen ________ _

499-E I Macon ___ _

506-D I Columbia ..
515-B Coffee ____ _

Timber,

1-Beams and

I

1 Number

I Concrete : Concrete Floors

I Eng. , Cong. Comm. \ of : Concrete 1and 1-Beams! ILin. Ft.)

~~v._ ~- [)j~_ ~--[)j~_ j_llridges I(Lin. Ft.) I _(i_i~-F~I 1

1 I 11 I 1 I

I

I

I 3I HI I

1

11 I

517-C Meriwether- Pike __

4&ti

518-C Harris_

4

520-C Macon ________ _

524-A Coweta___

-- 1

'"'>-' 534-ll Fulton

I

!OJ' 535-E Fulton

I

540-B Hart_

I

548

Turner_

553

Brooks __

11

554

Upson __ _

6

555

Spalding __ _

5Sii

Jenkins __

570

Paulding_

582-B Warren __

111

590-B 593-A 617 787-C 832-C 835 847-C 852 905-E

Baldwin.

10

Burke

I

1

Troup __

I

Talbot._

Appling __ Heard.

----1

1!

Dooly
Wilkinson_____

-:I

1~

E_ch_o_l_s_~---_-_--_-_-_-_ _ _~------~-~~-----

Timber !Lin. Ft. 'I

Concrete Bridge Culverts (Lin. Ft.)

Concrete Piers and Structural 1 Steel I Lin. Ft.)

Widened Concrete !Lin. Ft.)

Tota\s llin. Ft. I
800 0 1S7 0 17ti 0 4ti0 0 1.0911 0 158 0 202 0
:loD o
87 0 207 0 HiO 0 3:l4 0 520 0 1140 200 0 HiO 0 287 () 23 0 HiO 0 27 0 290 0 120 0 27 0 256 0 200.0 100 0 205 0

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF BRIDGES PLACED UNDER CONSTRUCTION

- - - - - --- ---

Project Number

County

Eng. Div.

Cong. Dis!.

DURING FISCAL YEAR ENDING JUNE 30, 1936

Numb..~~--. ~ -

I Concrete

Timber,

Comm. 1 of Concrete] and 1-Beams [ 1-Beams and
I 1
Dis!. ' Bridges (Lin. Ft.) (Lin. Ft.) Concrete Floors
_--1- __!_ _ _____ (lin. Ft.) ___

Timber (Lin. Ft.)

998-C 1028-B 1036 1039-A 1039-B 1040-A
"'...... 1042-A
0> 1052-B 1069-B 1082-C 1117 1121 1124-B 1126-B
1~10-A
1522-B 1528-A 1561-A M69-A 1578-A 1578-B

Fannin _____

Spalding __

Crawford ...

Houston... ______

12

Macon _______

3

Jasper_ _____ .. _.. _

2 1I :2::00-.0--1-.

Calhoun.. __

Douglas.....

Brantley. ____

Atkinson ____

Columbia _____

Emanuel ______

Elbert__ _____

Lanier ________

I

Montgomery ____ ----

Coffee _________ ----

Dougherty _______ ---- I

Laurena __________

Heard ______ ._

Jenkins __________

I

Burke _________

II

II

10

12

2

8

:;

11

12

II

12

lfiO.O 840.0 220.0

TOTALS...

i ----'------'------'----~~~~-~_I.3n_a_.o___I. 214 ~~----14. 694. o

Widened Concrete (Lin. Ft.)

Totals (Lin. Ft.)

100.0 440.0 22.0 200.0
21.0 28.0 234.0 426.0 75.0 100.0 140.0 22.0 34.0 240.0 160.0 140.0 160.0 364.0 874.0

STATE HIGHWAY BOARD OF GEORGIA LABORATORY
MATERIALS TESTED OR INSPECTED July 1,1936 to June 30,1936

------------- Kind of Material

I

~~~m -~;~~~ ~::::::::::::::::::-:::::::::::::: ~::::: ~

Asphaltic Limerock- ------ -- ___ - ___________________ _

Beams----- --------------- ---- --- --- - ---------------

Brick------------------------ - --------- ---------- - ---

cement ____ -----------------

--------------------

coarse Aggregate___________

________ _

concrete Core____

---- ----- --------- __

concrete Cubes---- ----------- . - - ________ ________ _

concrete Cylinders_________

________ _

concrete Pipe____________________ Copper Flashing_____________ . -corrugated Metal P1pe___________

---------------___________ _
___________ _

Expansion Joint_---Fertilizer ______ _

FGirlelearse(A__s_p_h_a__lt_)__-________ _

Guard RaiL---

Limerock ___ ------ .. -

on________

---------

PainL__ -Right of Way Markers ____ _

sand___

-----------

SteeL ______ _

Tar ______ _

Timber _____ _

Top Soil __ _

Water_ _________ _

TotaL ________ _

Number
896 39 16 62 87 2
2283 1132 738
1 2058
118 3
418 15 1 1 44 1 666 106 90 14 628 222 294 1 2885 125
12,946

217

STATE HIGHWAY BOARD OF GEORGIA

INDEX
A
Accounting-Alphabetical Index as Follows:

Page No.

Actual Allotments by Congressional Districts, Summary of

(1935)

_________________________________ Schedule 16 92

Actual Allotments by Congressional Districts, Summary of

(1936) _

---------------- _______________ Schedule 16 186

Actual Construction Allotments by Commissioners Districts, Summary of (1935) ----- ________________________ Schedule 14 89

Actual Construction Allotments by Commissioners Districts, Summary of(l936) ___________________________ Schedule 14 181

Actual Construction Allotments by Congressional Districts, Summary of (1935) _______________________________ Schedule 15 90

Actual Construction Allotments by Congressional Districts,

Summary of(1936) ------------------ _________ Schedule 15 183

Actual Construction Expenditures by Congressional Districts

and Division Units, Analysis of (1935) ________ Schedule 10-B 63

Actual Construction Expenditures by Congressional Districts

and Division Units, Analysis of (1936) __

_Schedule 10-Bl56

Administration Appropriation (1935) __ __ _____ Schedule 6-E 52

Administration Appropriation (1936) __

____ Schedule 6-F 143

Administration Expenditures by Object Classification, Analysis

of(1935) ______________________ _______

Schedule 8-A 55

Administration Expenditures by Object Classification, Analysis

of(1936) _ ________________

___ Schedule 8-A 148

Administration Expenditures by Units, Analysis of

(1935) _____________ _______________

______ Schedule 10-A 61

Administration Expenditures by Units, Analysis of

(1936)

__ Schedule 10-A 154

Administration Unencumbered Allotments by Units, Detail of

(1935) _

_________ _____ _____

___ Schedule 6-B 48

Administration Unencumbered Allotments by Units, Detail of

(1936)

_________ ____ ___________

___ Schedule 6-B 139

Allotments and Fund Balances, Reflecting Reconciliation with Expenditures, Summary of (1935) _____________ Schedule 6 44

Allotments and Fund Balances, Reflecting Reconciliation with

Expenditures, Summary of (1936) _ ____

_ Schedule 6 134

Assets and Liabilities, Statement of (1935) ______ Exhibit A

34

Assets and Liabilities, Statement of (1936)

___ Exhibit A 122

Comments ___________________________________________ ----- 11

Construction Allotments and Expenditures by Class of Project

(1935) ___ _ _______ _________ _

_Schedulel3 86

Construction Allotments and Expenditures by Class of Project

(19361 _ ____ ____________

__________ Schedule 13 178

Construction Allotments and Expenditures by Types

(1935) __

____________

____________ Schedule 12 85

218

INDEX-Continued

construction Allotments and Expenditures by Types

(1936) ___ - -- -------- ----- _______________ Schedule 12 177

construction Ex]Cenditures by Object Classification, Analysis

of (19351 -

--- Schedule S~B 56

construction Expenditures by Object Classification, Analysis

of (19361 -

- - -----

-_Schedule S~B 149

Equirment Exrenditures by Object Classification, Analysis of

(1935) _ --- -- ---- ------ -- ____________ Schedule8~D 58

Equipment Exrenditures by Object Classification, Analysis of

(1936) __ -

Schedule S~D 151

Equipment Unencumbered Allotments, Detail of

(1935) _

- Schedule 6~C 50

Equipment Unencumbered Allotments, Detail of

(19361 _

Scbedule 6~C 141

Estimated Participation, Reflecting Reconciliation with Rev~

enue Receipts, Summary of (1935)

__ Schedule 7 53

Estimated Participation, Reflecting Reconciliation with Rev~

enue Receirts, Summary of (1936)

__ Schedule 7 144

Expenditures by Congressional Districts, Summary of

(1935)

___ Schedule 9 59

Expenditures by Congressional Districts, Summary of

(1936) _

____ Schedule 9 152

Expenditures by Detail Object Classification, Analysis of

(1935) _ ______ ___

Schedule ll 74

Expenditures by Detail Object Classification, Analysis of

(1936)

Scbedule ll 168

Expenditures by Division Units, Summary of

(1935)

Schedule lO 60

Expenditures by Division Units, Summary of

(1936)

__ Schedule 10 153

Expenditures by Object Classification, Summary of

(1935)

_____ Schedule 8 54

Expenditures by Object Classification, Summary of

(1936)

_______ Schedule R 146

Fund Surplus, Reflecting Fund Revenue, Allotments and

Reserves, Reconciliation of (1935)

_. Exbibit B

36

Fund Surplus, Reflecting Fund Revenue, Allotments and

Reserves, Reconciliation of (1936)

_Exhibit B

124

General Maintenance Expenditures by Congressional Districts

and Division Units, Analysis of (193fi)

_Schedule 10~D 68

General Maintenance Exrenditures by Congressional Districts

and Division Units, Analysis of (1936)

_Schedule 10~D 162

Land, Buildings and Equi; ment (1935) _

Scl:tedule 4 41

Land, Buildings and Equi]: ment (1936) _

__Schedule 4 131

Legislative Transfer Exr: enditures by Object Classification,

Analysis of (19351

__ Schedule S~E 58

219

INDEX-- Continued

Legislative Transfer Expenditures by Object Classification

Analysis of (1936) _______

- Schedule 8-E

Maintenance Appropriation (1935)

_Schedule 6_D

Maintenance Appropriation (1936! ----- _-- --- .Schedule 6-D

Maintenance Expenditures by Object Classification, Analysis of

151
1541.~,

(1935) _______ - _______ - __ ---------- ----------_Schedule 8-C Maintenance Expenditures by Object Classification, Analysis of

57

(1936) ______ __ _-- ___ - ______ ---- -- ----------Maintenance Unencumbered Allotments by Units

Schedule fl-O and Congres-

150

sional Districts, Detail of (1935) - -- ___ - --- _Schedule 6-A Maintenance Unencumbered Allotments by Units and Congres-

46

sional Districts, Detail of (1936) ______ _ --- _ Schedule 6-A 136 Reconstruction Expenditures by Congressional Districts and

Division Units, Analysis of (1935)

Schedule 10-E 71

Reconstruction Expenditures by Congressional Districts and

Division Units, Analysis of (1936) _

Schedule 10-E 165

Refunding Certificates, Statement of (1935) ____ Schedule 5 42

Refunding Certificates, Statement of (1936) _- Schedule 5 132

Revenue Receipts and Expenditures, Comparative Statement

oL _

Exhibit D 128

Revenue Receipts and Expenditures, Statement of

(1935)

--- __ Exhibit C

38

Revenue Receipts and Expenditures, Statement of

(1936) _ __

________

____ ___ __ Exhibit C 126

Survey Expenditures by Congressional Districts and Division

Units, Analysis of(1935)

_____ Schedule 100 65

Survey Expenditures by Congressional Districts and Division

Units, Analysis of (1936)

.Schedule 10 0 15~

B

Bridges Placed under Construction, Summary of (1935)

115

Bridges Placed under Construction, Summary of (19361

214

G

Gasoline Tax, Distribution of, to Counties __

31

H

Highway Dollar, The (1935) _

37

Highway Dollar, The (1936) _

125

History of State Highway Board Membership __

8

L

Laboratory -Materials Tested or Inspected (1935) _

119

Laboratory-Materials Tested or Inspected (1936) _

217

Letter of Transmittal

__________________ _

220

INDEX-Continued

M

)fileage by Commissioners Districts (1935) _

96

)fileage by Commissioners Districts (1936)

192

)fileage by Congressional Districts (1935) __

96

)fileage by Congressional Districts (1936) __

192

)fileage bY Counties--Showing Commissioners Districts, Con-

gressional Districts, Engineering Divisions, Area, Population

and Percentages -- __ ______________ _

23

)fileage by Engineering Divisions (1935) _

96

)fileage by Engineering Divisions (1936) __ _

192

)fileage Placed under Construction, Summary of (1935) __ _

99

)fileage Placed under Construction, Summary of (1936) ____

196

)fileage Placed under Construction by Congressional Districts

(1935) - - ------- ------------------- -- ----------- -------- --- 112 :Mileage Placed under Construction by Congressional Districts

(1936) - - ---------------------------- ------------------------- 211 :Mileage Placed under Construction by Engineering Divisions and
commissioners Districts (1935) ________________________________ 111

Mileage Placed under Construction by Engineering Divisions and

Commissioners Districts (1936) _

__ _____________

209

0 Officials of State Highway Department __________________________ 10

221